Number~Title~SpecYear~EffectiveDate~Status~DocumentType~Notes~SharePointLink 800~Revisions To The 2023 Construction & Material Specifications~2023~1/16/2026~Active~Supplemental Spec~Designers should use the most current and applicable SS800 prior to the Plan Package Due milestone. https://www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Pages/letting-schedule.aspx~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01162026_for_2023.pdf 801~Crack and Joint Cleaning and Sealing with Silicone Sealant~2005~10/30/2003~Active~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/801_10302003_for_2005.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2005~4/15/2005~Active~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_04152005_for_2005.PDF 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2008~1/15/2010~Active~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_01152010_for_2008.PDF 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2008~1/16/2009~Active~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_01162009_for_2008.PDF 802~Constructing and Inspecting Pipe Culverts, Sewers, Drains, and Drainage Structures~2010~1/20/2012~Active~Supplemental Spec~This specification requires the Contractor to install drainage conduit and drainage structures under a performance specification. (see note more)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_2011-10-24(final).pdf 803~Rubberized Open Graded Asphalt Friction Course~2019~1/21/2022~Active~Supplemental Spec~For use with SS 800 dated 1/21/22 or later. Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas. ACBFS may not be economically available in all areas of the~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_01212022_for_2019.pdf 803~Rubberized Open Graded Asphalt Friction Course~2023~1/21/2022~Active~Supplemental Spec~For use with SS 800 dated 1/21/22 or later.  Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas.  ACBFS may not be economically available in all ar~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_01212022_for_2023.pdf 804~Fiber Optic Cable For Traffic Signal Interconnet~2010~7/19/2013~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07192013_for_2010.pdf 804~Fiber Optic Cable And Components~2013~1/15/2016~Active~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01152016_for_2013.pdf 804~Fiber Optic Cable And Components~2016~1/18/2019~Active~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01182019_for_2016.pdf 804~Fiber Optic Cable and Components~2019~1/20/2023~Active~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01202023_for_2019.pdf 804~Fiber Optic Cable and Components~2023~1/16/2026~Active~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01162026_for_2023.pdf 805~GPS (Global Positioning System) Clock Assembly~2010~7/16/2010~Active~Supplemental Spec~For use for any project that wants an alternative to time based coordination.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/805_07162010_for_2010.pdf 805~GPS (Global Positioning System) Clock Assembly~2013~7/16/2010~Active~Supplemental Spec~For use for any project that wants an alternative to time based coordination.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/805_07162010_for_2013.PDF 805~GPS (Global Positioning System) Clock Assembly~2016~7/16/2010~Active~Supplemental Spec~For use for any project that wants an alternative to time based coordination.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/805_07162010_for_2016.PDF 805~GPS (Global Positioning System) Clock Assembly~2019~7/16/2010~Active~Supplemental Spec~For use for any project that wants an alternative to time based coordination.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/805_07162010_for_2019.PDF 805~GPS (Global Positioning System) Clock Assembly~2023~7/16/2010~Active~Supplemental Spec~For use for any project that wants an alternative to time based coordination.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/805_07162010_for_2023.PDF 806~Asphalt Concrete With Joint Density For Multi-Lane Highways~2013~3/2/2015~Active~Supplemental Spec~This specification is intended for use on limited access, multi-lane facilities, with controlled grades and cross slopes. (Contact the Office of Construction Administration prior to specifying this note.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/806_03022015_for_2013.pdf 806~Asphalt Concrete With Joint Density For Multi-Lane Highways~2016~3/2/2015~Active~Supplemental Spec~This specification is intended for use on limited access, multi-lane facilities, with controlled grades and cross slopes. (Contact the Office of Construction Administration prior to specifying this note.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/806_03022015_for_2016.PDF 807~Wet Reflective Liquid Applied Pavement Markings~2019~1/21/2022~Active~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime permanent wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_01212022_for_2019.pdf 807~Wet Reflective Liquid Applied Pavement Markings~2023~1/17/2025~Active~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime permanent wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_01172025_for_2023.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2023~7/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_07192024_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2013~4/15/2016~Active~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_04152016_for_2013.pdf 809~Intelligent Transportation System (ITS) Devices and Components~2016~1/18/2019~Active~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01182019_for_2016.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~7/21/2023~Active~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07212023_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices and Components~2023~1/16/2026~Active~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01162026_for_2023.pdf 810~Vital Inductive Loop Processor System~2016~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/810_04202018_for_2016.pdf 810~Vital Inductive Loop Processor System~2019~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/810_04202018_for_2019.pdf 810~Vital Inductive Loop Processor System~2023~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/810_04202018_for_2023.pdf 811~Green UPS (Uninterruptible Power Supply)~2019~7/15/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/811_07152022_for_2019.pdf 811~Green UPS (Uninterruptible Power Supply)~2023~7/15/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/811_07152022_for_2023.pdf 812~Precast Light Pole Foundation~2019~10/16/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_10162020_for_2019.pdf 812~Precast Light Pole Foundation~2023~10/16/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_10162020_for_2023.pdf 813~Luminaire, Solid-State (LED)~2019~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_07212023_for_2019.pdf 813~Luminaire, Solid-State (LED)~2023~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_07212023_for_2023.pdf 814~Heat-Fused Preformed Thermoplastic Shield Pavement Marking~2016~7/15/2016~Active~Supplemental Spec~This Supplemental Specification is to be used for any project with Heat-Fused Preformed Thermoplastic Shield Pavement Marking.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/814_07152016_for_2016.pdf 814~Heat-Fused Preformed Thermoplastic Shield Pavement Marking~2019~7/15/2016~Active~Supplemental Spec~This Supplemental Specification is to be used for any project with Heat-Fused Preformed Thermoplastic Shield Pavement Marking.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/814_07152016_for_2019.pdf 814~Heat-Fused Preformed Thermoplastic Shield Pavement Marking~2023~7/15/2016~Active~Supplemental Spec~This Supplemental Specification is to be used for any project with Heat-Fused Preformed Thermoplastic Shield Pavement Marking.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/814_07152016_for_2023.pdf 815~SPREAD SPECTRUM RADIO~2019~4/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_04162021_for_2019.pdf 815~Spread Spectrum Radio~2023~4/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_04162021_for_2023.pdf 816~Video Detection System~2005~1/19/2007~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01192007_for_2005.PDF 816~Video Detection System~2008~1/19/2007~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01192007_for_2008.PDF 816~Video Detection System~2010~1/20/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 816 012012(final).pdf 816~Video Detection System~2013~1/20/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01202012_for_2013.PDF 816~Video Detection System~2016~1/18/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01182019_for_2016.pdf 816~Video Detection System~2019~10/18/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_10182019_for_2019.pdf 816~Video Detection System~2023~10/18/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_10182019_for_2023.pdf 817~Spray Thermooplastic Pavement Marking~2010~4/20/2012~Active~Supplemental Spec~For use in accordance with the 2010 C&MS on all projects using spray thermoplastic pavement marking material~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 817_04202012.pdf 818~Programmable Logic Controller (PLC)~2016~1/19/2018~Active~Supplemental Spec~This specification shall be used for highway lighting in a tunnel or long underpass.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/818_01192018_for_2016.pdf 818~Programmable Logic Controller (PLC)~2019~1/19/2018~Active~Supplemental Spec~This specification shall be used for highway lighting in a tunnel or long underpass.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/818_01192018_for_2019.pdf 818~Programmable Logic Controller (PLC)~2023~1/19/2018~Active~Supplemental Spec~This specification shall be used for highway lighting in a tunnel or long underpass.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/818_01192018_for_2023.pdf 819~Railroad Preemption Interface~2019~1/17/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_01172020_for_2019.pdf 819~Railroad Preemption Interface~2023~1/17/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_01172020_for_2023.pdf 820~Instrumentation Enclosure~2019~7/15/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/820_07152022_for_2019.pdf 820~Instrumentation Enclosure~2023~7/15/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/820_07152022_for_2023.pdf 821~Arrow Board~2010~4/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 821_04202012.pdf 821~Arrow Board~2013~4/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/821_04202012_for_2013.PDF 821~Arrow Board~2016~4/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/821_04202012_for_2016.PDF 821~Arrow Board~2019~4/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/821_04202012_for_2019.PDF 821~Arrow Board~2023~4/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/821_04202012_for_2023.PDF 822~Hot In-Place Recycling, Intermediate Course~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_01212022_for_2019.pdf 822~Hot In-Place Recycling, Intermediate Course~2023~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_01212022_for_2023.pdf 823~Light Traffic Asphalt Mixture Composition Requirements~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_01212022_for_2019.pdf 823~Light Traffic Asphalt Mixture Composition Requirements~2023~10/20/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_10202023_for_2023.pdf 824~System Analysis~2019~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_07212023_for_2019.pdf 824~System Analysis~2023~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_07212023_for_2023.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2023~7/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_07192024_for_2023.pdf 826~Asphalt Concrete With Fibers~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_01212022_for_2019.pdf 826~Asphalt Concrete With Fibers~2023~10/20/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_10202023_for_2023.pdf 827~Full Depth Reclamation With Cement~2023~7/18/2025~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/827_07182025_for_2023.pdf 828~LED Blank-Out Sign~2016~1/19/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/828_01192018_for_2016.pdf 828~LED Blank-Out Sign~2019~1/19/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/828_01192018_for_2019.pdf 828~LED Blank-Out Sign~2023~1/19/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/828_01192018_for_2023.pdf 829~Work Zone Egress Warning System~2016~1/20/2017~Active~Supplemental Spec~Use only in accordance with the Traffic Engineering Manual (TEM) Part 6, Section 640-29.2.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/829_01202017_for_2016.pdf 829~Work Zone Egress Warning System~2019~1/20/2017~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/829_01202017_for_2019.pdf 829~Work Zone Egress Warning System~2023~1/20/2017~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/829_01202017_for_2023.pdf 830~Automated Flagger Assistance Device~2010~4/20/2012~Active~Supplemental SPec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 830_04202012.pdf 830~Automated Flagger Assistance Device~2013~1/17/2014~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/830_01172014_for_2013.pdf 830~Automated Flagger Assistance Device~2016~1/17/2014~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/830_01172014_for_2016.PDF 830~Automated Flagger Assistance Device~2019~7/19/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/830_07192019_for_2019.pdf 830~Automated Flagger Assistance Device~2023~7/19/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/830_07192019_for_2023.pdf 831~Longitudinal Channelizing Device~2019~4/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/831_04212023_for_2019.pdf 831~Longitudinal Channelizing Device~2023~4/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/831_04212023_for_2023.pdf 832~Temporary Sediment And Erosion Control~2023~7/18/2025~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_07182025_for_2023.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2013~7/17/2015~Active~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering if there are any questions.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07172015_for_2013.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2016~10/20/2017~Active~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_10202017_for_2016.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2019~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07212023_for_2019.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2023~1/16/2026~Active~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01162026_for_2023.pdf 835~Exfiltration Trench~2005~4/21/2006~Active~Supplemental Spec~The designer must list standard construction drawing WQ-1.3 when supplemental specification 835 is specified. For design criteria or other information required to design this SS contact the Hydraulics Section in the Office of Structural Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/835_04212006_for_2005.PDF 835~Exfiltration Trench~2008~4/18/2008~Active~Supplemental Spec~The designer must list standard construction drawing WQ-1.3 when supplemental specification 835 is specified. For design criteria or other information required to design this SS contact the Hydraulics Section in the Office of Structural Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/835_04182008_for_2008.PDF 835~Exfiltration Trench~2010~4/18/2008~Active~Supplemental Spec~The designer must list standard construction drawing WQ-1.3 when supplemental specification 835 is specified. For design criteria or other information required to design this SS contact the Hydraulics Section in the Office of Structural Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/835_04182008_for_2010.PDF 835~Exfiltration Trench~2013~12/31/2012~Active~Supplemental Spec~This supplemental specification will be used as a post-construction storm water BMP option. The exfiltration trench is a new storm water post construction BMP. See Note for further details. Contact the Office of Hydraulic Engineering for more guidance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/835_12312012_for_2013.PDF 836~Seeding And Erosion Control With Turf Reinforcing Mat~2023~1/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_01192024_for_2023.pdf 837~Liner Pipe~2010~1/20/2012~Active~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_rev 2011-09-22(final).pdf 837~Liner Pipe~2013~1/15/2016~Active~Supplemental Spec~See Designer note in Specification~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01152016_for_2013.pdf 837~Liner Pipe~2016~10/20/2017~Active~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_10202017_for_2016.pdf 837~Liner Pipe~2019~1/20/2023~Active~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits.  Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01202023_for_2019.pdf 837~Liner Pipe~2023~1/16/2026~Active~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits.  Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01162026_for_2023.pdf 838~GABIONS~2019~1/15/2021~Active~Supplemental Spec~This Supplemental Specification is to be included on all projects using Gabions in consultation with the Offices of Structural, Hydraulic, or Geotechnical Engineering. For gabion retaining walls, include quantities for excavation under Item 503.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_01152021_for_2019.pdf 838~Gabions~2023~7/18/2025~Active~Supplemental Spec~This Supplemental Specification is to be included on all projects using Gabions in consultation with the Offices of Structural, Hydraulic, or Geotechnical Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_07182025_for_2023.pdf 839~Trench Drain System~2019~7/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_ 07162021_for 2019.pdf 839~Trench Drain System~2023~7/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_ 07162021_for 2023.pdf 840~Mechanically Stabilized Earth Wall~2010~4/19/2013~Active~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04192013_for_2010.pdf 840~Mechanically Stabilized Earth Wall~2013~7/17/2015~Active~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07172015_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2016~1/18/2019~Active~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01182019_for_2016.pdf 840~Mechanically Stabilized Earth Wall~2019~4/15/2022~Active~Supplemental Spec~This Supplemental Specification  is to be included on all projects using MSE Walls.  See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04152022_for_2019.pdf 840~Mechanically Stabilized Earth Wall~2023~1/16/2026~Active~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01162026_for_2023.pdf 841~Conduit Renewal Using Spiral Wound Liner~2010~4/15/2011~Active~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_2011-04-15.pdf 841~Conduit Renewal Using Spiral Wound Liner~2013~1/15/2016~Active~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_01152016_for_2013.pdf 841~Conduit Renewal Using Spiral Wound Liner~2016~1/15/2016~Active~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_01152016_for_2016.pdf 841~Conduit Renewal Using Spiral Wound Liner~2019~1/15/2016~Active~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_01152016_for_2019.pdf 841~Conduit Renewal Using Spiral Wound Liner~2023~1/15/2016~Active~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_01152016_for_2023.pdf 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2005~1/19/2007~Active~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_01192007_for_2005.PDF 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2008~1/19/2007~Active~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_01192007_for_2008.PDF 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2010~7/15/2011~Active~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Proposed changes to SS842 for 7-15-2011.pdf 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2013~7/15/2011~Active~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_07152011_for_2013.PDF 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2016~7/15/2011~Active~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_07152011_for_ 2016.PDF 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2019~7/15/2011~Active~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_07152011_for_ 2019.pdf 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2023~7/15/2011~Active~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_07152011_for_ 2023.pdf 843~Patching Concrete Structures With Trowelable Mortar~2023~1/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_01192024_for_2023.pdf 844~Concrete Patching With Embedded Galvanic Anode Protection~2016~4/20/2018~Active~Supplemental Spec~Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer. See note in document.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/844_04202018_for_2016.pdf 844~Concrete Patching With Embedded Galvanic Anode Protection~2019~4/20/2018~Active~Supplemental Spec~Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer. See note in document.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/844_04202018_for_2019.pdf 844~Concrete Patching With Embedded Galvanic Anode Protection~2023~1/17/2025~Active~Supplemental Spec~Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer.  See note in document.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/844_01172025_for_2023.pdf 845~Shop and Field Metallizing of Structural Steel~2016~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_04202018_for_2016.pdf 845~Shop and Field Metallizing of Structural Steel~2019~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_04202018_for_2019.pdf 845~Shop and Field Metallizing of Structural Steel~2023~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_04202018_for_2023.pdf 846~Polymer Modified Asphalt Expansion Joint System~2013~4/17/2015~Active~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_04172015_for_2013.pdf 846~Polymer Modified Asphalt Expansion Joint System~2016~4/17/2015~Active~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_04172015_for_2016.PDF 846~Polymer Modified Asphalt Expansion Joint System~2019~4/17/2015~Active~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_04172015_for_2019.PDF 846~Polymer Modified Asphalt Expansion Joint System~2023~4/17/2015~Active~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_04172015_for_2023.PDF 847~Bridge Deck Repair And Overlay With Concrete Using Scarification And Chipping~2023~7/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_07192024_for_2023.pdf 848~Bridge Deck Repair And Overlay With Concrete Using Hydro-Demolition~2023~7/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 07192024_for_2023.pdf 849~Heat Straightening of Damaged Structural Steel~2010~1/18/2013~Active~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01182013_for_2010.pdf 849~Heat Straightening of Damaged Structural Steel~2013~1/18/2013~Active~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01182013_for_2013.pdf 849~Heat Straightening of Damaged Structural Steel~2016~1/18/2013~Active~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01182013_for_2016.PDF 849~Heat Straightening of Damaged Structural Steel~2019~1/18/2013~Active~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01182013_for_2019.PDF 849~Heat Straightening of Damaged Structural Steel~2023~1/18/2013~Active~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01182013_for_2023.PDF 850~Grooving For Recessed Pavement Markings~2019~7/21/2023~Active~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet. Not intended for use with bridge deck epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_07212023_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2023~7/21/2023~Active~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet. Not intended for use with bridge deck epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_07212023_for_2023.pdf 851~Precast Gravity And Semigravity Retaining Wall~2023~1/17/2025~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_01172025_for_2023.pdf 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2005~4/19/2002~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s. Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_04192002_for_2005.pdf 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2008~4/18/2008~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s. Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_04182008_for_2008.PDF 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2010~4/18/2008~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s. Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_04182008_for_2010.PDF 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2013~12/31/2012~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s. Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_12312012_for_2013.PDF 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2016~12/31/2012~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s. Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_12312012_for_2016.PDF 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2019~12/31/2012~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s. Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_12312012_for_2019.PDF 852~Ultra-Thin Whitetopping Overlay with Steel Fiber Reinforced Concrete~2023~12/31/2012~Active~Supplemental Spec~For use on flexible pavements only, not composite. Not for use on mainline interstate and interstate lookalike’s.  Intended mainly for high stress locations as defined in the High Stress Guidelines, Pavement Design & Rehabilitation Manual, Appendix B~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/852_12312012_for_2023.PDF 855~Post-Tensioning~2016~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/855_04202018_for_2016.pdf 855~Post-Tensioning~2019~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/855_04202018_for_2019.pdf 855~Post-Tensioning~2023~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/855_04202018_for_2023.pdf 856~Bridge Deck Waterproofing Asphalt Surface Course~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_01212022_for_2019.pdf 856~Bridge Deck Waterproofing Asphalt Surface Course~2023~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_07212023_for_2023.pdf 857~Asphalt Concrete with Gilsonite~2008~4/18/2008~Active~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_04182008_for_2008.PDF 857~Asphalt Concrete With Gilsontie~2010~10/19/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_10192012_for_2010.pdf 857~Asphalt Concrete With Gilsonite~2013~7/18/2014~Active~Supplemental Spec~This item is a highly rut-resistant mix intended for use in high stress areas. Use the 12.5mm mix if there are greater than 1500 trucks in the opening day traffic. Use 446 acceptance if the quantity is 250 tons or greater. Otherwise Use 448 acceptance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_07182014_for_2013.pdf 857~Asphalt Concrete with Gilsonite~2016~1/18/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_01182019_for_2016.pdf 858~Thin Polymer (Epoxy) Overlays for Structural Slabs~2016~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/858_04202018_for_2016.pdf 858~Thin Polymer (Epoxy) Overlays for Structural Slabs~2019~4/20/2018~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/858_04202018_for_2019.pdf 858~Thin Polymer (Epoxy) Overlays for Structural Slabs~2023~1/17/2025~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/858_01172025_for_2023.pdf 859~Asphalt Concrete With Verglimit~2019~1/21/2022~Active~Supplemental Spec~For use with SS 800 dated 1/21/22 or later. This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01212022_for_2019.pdf 859~Asphalt Concrete With Verglimit~2023~1/21/2022~Active~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01212022_for_2023.pdf 860~Thinlay Asphalt Concrete~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/860_01212022_for_2019.pdf 860~Thinlay Asphalt Concrete~2023~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/860_01212022_for_2023.pdf 861~SUPERPAVE ASPHALT CONCRETE FOR 12.5 MM INTERMEDIATE COURSE~2019~1/15/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_01152021_for_2019.pdf 862~Rockfall Protection~2010~1/20/2012~Active~Supplemental Spec~Consult with the Office of Geotechnical Engineering when considering the use of Rockfall Protection.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_01202012 (final).pdf 862~Rockfall Protection~2013~10/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_10162015_for_2013.pdf 862~Rockfall Protection~2016~10/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_10162015_for_2016.PDF 862~Rockfall Protection~2019~10/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_10162015_for_2019.PDF 862~Rockfall Protection~2023~1/17/2025~Active~Supplemental Spec~Consult with the Office of Geotechnical Engineering when considering the use of Rockfall Protection.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_01172025_for_2023.pdf 863~Reinforced Soil Slopes~2019~10/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10212022_for_2019.pdf 863~Reinforced Soil Slopes~2023~7/21/2023~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_07212023_for_2023.pdf 864~POLYURETHANE EXPANDING FOAM BACKFILL~2019~10/16/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/864_10162020_for_2019.pdf 864~Polyurethane Expanding Foam Backfill~2023~10/16/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/864_10162020_for_2023.pdf 866~Ground Anchors~2016~4/21/2017~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/866_04212017_for 2016.pdf 866~Ground Anchors~2019~4/21/2017~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/866_04212017_for 2019.pdf 866~Ground Anchors~2023~4/21/2017~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/866_04212017_for 2023.pdf 867~Temporary Wire Faced Mechanically Stabilized Earth Wall~2019~4/15/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/867_04152022_for_2019.pdf 867~Temporary Wire Faced Mechanically Stabilized Earth Wall~2023~4/15/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/867_04152022_for_2023.pdf 869~High Load Multi Rotational (HLMR) Bearings~2010~4/20/2012~Active~Supplemental Spec~This specification is to be used on all projects that utilize high load multi-rotational bearing types (e.g. pot bearings or disc bearings)....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS869_04202012.pdf 869~High Load Multi Rotational (HLMR) Bearings~2013~10/17/2014~Active~Supplemental Spec~This specification is to be used on all projects that utilize high load multi-rotational bearing types (e.g. pot bearings or disc bearings)....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/869_10172014_for_2013.pdf 869~High Load Multi Rotational (HLMR) Bearings~2016~10/17/2014~Active~Supplemental Spec~This specification is to be used on all projects that utilize high load multi-rotational bearing types (e.g. pot bearings or disc bearings)....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/869_10172014_for_2016.PDF 869~High Load Multi Rotational (HLMR) Bearings~2019~10/17/2014~Active~Supplemental Spec~This specification is to be used on all projects that utilize high load multi-rotational bearing types (e.g. pot bearings or disc bearings)....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/869_10172014_for_2019.PDF 869~High Load Multi Rotational (HLMR) Bearings~2023~10/17/2014~Active~Supplemental Spec~This specification is to be used on all projects that utilize high load multi-rotational bearing types (e.g. pot bearings or disc bearings)....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/869_10172014_for_2023.PDF 870~Prefabricated Modular Retaining Wall~2019~10/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_10212022_for_2019.pdf 870~Prefabricated Modular Retaining Wall~2023~7/18/2025~Active~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using Prefabricated Modular Retaining Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_07182025_for_2023.pdf 871~Embankment Construction Using Recycled Materials~2005~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment, pavement integrity or long-term performance. ODOT does not require the use of recycled materials.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2005.PDF 871~Embankment Construction Using Recycled Materials~2008~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment or pavement integrity or long-term performance. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2008.PDF 871~Embankment Construction Using Recycled Materials~2010~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment or pavement integrity or long-term performance. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2010.PDF 871~Embankment Construction Using Recycled Materials~2013~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment or pavement integrity or long-term performance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2013.PDF 871~Embankment Construction Using Recycled Materials~2016~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment or pavement integrity or long-term performance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2016.PDF 871~Embankment Construction Using Recycled Materials~2019~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment or pavement integrity or long-term performance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2019.PDF 871~Embankment Construction Using Recycled Materials~2023~4/15/2005~Active~Supplemental Spec~This note was written to safely use these recycled products without jeopardizing the embankment or pavement integrity or long-term performance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/871_04152005_for_2023.PDF 872~Void Reducing Asphalt Membrane~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_01212022_for_2019.pdf 872~Void Reducing Asphalt Membrane~2023~1/17/2025~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_01172025_for_2023.pdf 873~WET REFLECTIVE REMOVABLE TAPE~2019~4/16/2021~Active~Supplemental Spec~This Supplemental Specification is included by reference in C&MS Item 614 for Work Zone Pavement Markings. This item is paid for with Item 614 pay items.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_04162021_for_2019.pdf 873~Wet Reflective Removable Tape~2023~4/16/2021~Active~Supplemental Spec~This Supplemental Specification is included by reference in C&MS Item 614 for Work Zone Pavement Markings. This item is paid for with Item 614 pay items.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_04162021_for_2023.pdf 874~Longitudinal Joint Preparation~2019~4/17/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_04172020_for_2019.pdf 874~Longitudinal Joint Preparation~2023~4/17/2020~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_04172020_for_2023.pdf 875~Hot Applied Asphaltic Joint Adhesive Material and Construction Requirements~2013~1/17/2014~Active~Supplemental Spec~Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/875_01172014_for_2013.pdf 875~Longitudinal Joint Adhesive~2016~1/18/2019~Active~Supplemental Spec~Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/875_01182019_for_2016.pdf 875~Longitudinal Joint Adhesive~2019~1/18/2019~Active~Supplemental Spec~Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/875_01182019_for_2019.pdf 875~Longitudinal Joint Adhesive~2023~1/17/2025~Active~Supplemental Spec~Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/875_01172025_for_2023.pdf 878~Inspection and Compaction Testing of Unbound Materials~2010~7/15/2011~Active~Supplemental Spec~Contact the District Construction Engineer before incorporating this note into the plans. SS 878 and 879 are very similar specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_rev 2011-06-09.pdf 878~Inspection and Compaction Testing of Unbound Materials~2013~10/18/2013~Active~Supplemental Spec~Contact the District Construction Administrator before incorporating this note into the plans. SS 878 and 879 are very similar specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_10182013_for_2013.pdf 878~Inspection and Compaction Testing of Unbound Materials~2016~4/21/2017~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04212017_for_2016.pdf 878~Inspection And Compaction Testing Of Unbound Materials~2019~1/21/2022~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01212022_for_2019.pdf 878~Inspection and Compaction Testing of Unbound Materials~2023~1/16/2026~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01162026_for_2023.pdf 880~Asphalt Concrete With Warranty~2019~1/21/2022~Active~Supplemental Spec~For use with the SS 800 dated 1/21/22 or later. Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_01212022_for_2019.pdf 880~Asphalt Concrete With Warranty~2023~1/21/2022~Active~Supplemental Spec~For use with the SS 800 dated 1/21/22 or later.  Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_01212022_for_2023.pdf 881~Full Depth Reclamation With Emulsified Asphalt~2023~1/17/2025~Active~Supplemental Spec~This specification is intended for use on full depth flexible pavements that require significant quantities of full depth repairs which may not be cost effective to perform. Do not use this specification for rigid or composite pavements. Field investigati~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_01172025_for_2023.pdf 883~Field Metalizing of Structural Steel with Warranty~2005~8/10/2007~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_08102007_for_2005.PDF 883~Field Metalizing of Structural Steel with Warranty~2008~8/10/2007~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_08102007_for_2008.PDF 883~Field Metalizing of Structural Steel with Warranty~2010~8/10/2007~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_08102007_for_2010.PDF 883~Field Metalizing of Structural Steel with Warranty~2013~12/31/2012~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_12312012_for_2013.PDF 883~Field Metalizing of Structural Steel with Warranty~2016~12/31/2012~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_12312012_for_2016.PDF 883~Field Metalizing of Structural Steel with Warranty~2019~12/31/2012~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_12312012_for_2019.PDF 883~Field Metalizing of Structural Steel with Warranty~2023~12/31/2012~Active~Supplemental Spec~Include all pay items. SS845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/883_12312012_for_2023.PDF 884~Concrete Pavement with Warranty~2005~4/15/2005~Active~Supplemental Spec~Must also list Supplemental Specification 812.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_04152005_for_2005.PDF 884~Concrete Pavement With Warranty~2008~4/18/2008~Active~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_04182008_for_2008.PDF 884~Concrete Pavement With Warranty~2010~4/18/2008~Active~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_04182008_for_2010.PDF 884~Concrete Pavement With Warranty~2013~12/31/2012~Active~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_12312012_for_2013.PDF 884~Concrete Pavement With Warranty~2016~10/19/2018~Active~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_10192018_for_2016.pdf 884~Concrete Pavement With Warranty~2019~10/19/2018~Active~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_10192018_for_2019.pdf 884~Concrete Pavement With Warranty~2023~10/19/2018~Active~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_10192018_for_2023.pdf 885~Painting of Structural Steel with Warranty~2005~7/20/2007~Active~Supplemental Spec~"Use this specification on all projects that have a Primary Work Category entitled ""Bridge Painting"". Contact the District for designation of the project Primary Work Category. Contact Central Office, Office of Construction Administration.."~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_07202007_for_2005.PDF 885~Painting of Structural Steel with Warranty~2008~7/20/2007~Active~Supplemental Spec~Use this specification on all projects that have a Primary Work Category entitled “Bridge Painting”. Contact the District for designation of the project Primary Work Category. For use of this specification on other projects, contact Central Office, Office~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_07202007_for_2008.PDF 885~Painting of Structural Steel with Warranty~2010~7/20/2007~Active~Supplemental Spec~Use this specification on all projects that have a Primary Work Category entitled “Bridge Painting”. Contact the District for designation of the project Primary Work Category.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_07202007_for_2010.PDF 885~Painting of Structural Steel with Warranty~2013~12/31/2012~Active~Supplemental Spec~"Use this specification on all projects that have a Primary Work Category entitled ""Bridge Painting"". Contact the District for designation of the project Primary Work Category."~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_12312012_for_2013.PDF 885~Painting of Structural Steel with Warranty~2016~12/31/2012~Active~Supplemental Spec~"Use this specification on all projects that have a Primary Work Category entitled ""Bridge Painting"". Contact the District for designation of the project Primary Work Category."~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_12312012_for_2016.PDF 885~Painting of Structural Steel with Warranty~2019~12/31/2012~Active~Supplemental Spec~"Use this specification on all projects that have a Primary Work Category entitled ""Bridge Painting"". Contact the District for designation of the project Primary Work Category."~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_12312012_for_2019.PDF 885~Painting of Structural Steel with Warranty~2023~12/31/2012~Active~Supplemental Spec~"Use this specification on all projects that have a Primary Work Category entitled ""Bridge Painting"". Contact the District for designation of the project Primary Work Category."~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_12312012_for_2023.PDF 886~Fog Seal Material And Construction Requirements~2019~4/19/2019~Active~Supplemental Spec~Do not use with Item 422 Double Chip Seal or Item 422 Single Chip Seal, Type B.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_04192019_for_2019.pdf 886~Fog Seal Material And Construction Requirements~2023~4/19/2019~Active~Supplemental Spec~Do not use with Item 422 Double Chip Seal or Item 422 Single Chip Seal, Type B.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_04192019_for_2023.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials And Construction Requirements~2019~1/21/2022~Active~Supplemental Spec~For use with SS 800 dated 1/21/22 or later.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01212022_for_2019.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials And Construction Requirements~2023~1/21/2022~Active~Supplemental Spec~For use with SS 800 dated 1/21/22 or later.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01212022_for_2023.pdf 888~Portland Cement Concrete Pavement Using Qc/Qa~2005~1/3/2002~Active~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Office of Pavement Engineering at 614-995-5993~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_01032002_for_2005.pdf 888~Portland Cement Concrete Pavement Using QC/QA~2010~10/21/2011~Active~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Office of Pavement Engineering at 614-995-5994~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS888.QA-QC Concrete.Final.2011.OCT.21(Final).pdf 888~High Friction Surface Treatment~2019~10/18/2019~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_10182019_for_2019.pdf 888~High Friction Surface Treatment~2023~1/16/2026~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_01162026_for_2023.pdf 889~Longitudinal Diamond Grooving~2019~7/17/2020~Active~Supplemental Spec~The pavement needs to be in decent shape with no deteriorated cracks in the area to be grooved.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/889_07172020_for_2019.pdf 889~Longitudinal Diamond Grooving~2023~7/17/2020~Active~Supplemental Spec~The pavement needs to be in decent shape with no deteriorated cracks in the area to be grooved.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/889_07172020_for_2023.pdf 892~QC/QA Concrete for New Bridge Decks with Warranty~2005~4/15/2005~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_04152005_for_2005.PDF 892~QC/QA Concrete for New Bridge Decks with Warranty~2008~4/15/2005~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_04152005_for_2008.PDF 892~QC/QA Concrete for New Bridge Decks with Warranty~2010~4/15/2005~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_04152005_for_2010.PDF 892~QC/QA Concrete for New Bridge Decks with Warranty~2013~12/31/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_12312012_for_2013.PDF 892~QC/QA Concrete for New Bridge Decks with Warranty~2016~12/31/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_12312012_for_2016.PDF 892~QC/QA Concrete for New Bridge Decks with Warranty~2019~12/31/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_12312012_for_2019.PDF 892~QC/QA Concrete for New Bridge Decks with Warranty~2023~12/31/2012~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/892_12312012_for_2023.PDF 893~CONTINUOUS FLIGHT AUGER PILES~2019~4/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/893_04162021_for_2019.pdf 893~Continuous Flight Auger Piles~2023~4/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/893_04162021_for_2023.pdf 894~Testing Foundations With Thermal Integrity Profiling (TIP)~2019~4/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/894_04162021_for_2019.pdf 894~Testing Foundations With Thermal Integrity Profiling (TIP)~2023~4/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/894_04162021_for_2023.pdf 895~Manufactured Water Quality Structure~2005~4/18/2008~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04182008_for_2005.PDF 895~Manufactured Water Quality Structure~2008~4/17/2009~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04172009_for_2008.PDF 895~Manufactured Water Quality Structure~2010~10/15/2010~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_2010-10-15.pdf 895~Manufactured Water Quality Structure~2013~4/18/2014~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04182014_for_2013.pdf 895~Manufactured Water Quality Structure~2016~4/18/2014~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04182014_for_2016.PDF 895~Manufactured Water Quality Structure~2019~4/18/2014~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04182014_for_2019.PDF 895~Manufactured Water Quality Structure~2023~4/18/2014~Active~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-3 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04182014_for_2023.PDF 896~Work Zone Queue Detection Warning System~2016~7/21/2017~Active~Supplemental Spec~Use only in accordance with the Traffic Engineering Manual (TEM) Part 6, Section 640-29.1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_07212017_for_2016.pdf 896~Work Zone Queue Detection Warning System~2019~7/21/2017~Active~Supplemental Spec~Use only in accordance with the Traffic Engineering Manual (TEM) Part 6, Section 640-29.1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_07212017_for_2019.pdf 896~Work Zone Queue Detection Warning System~2023~7/21/2017~Active~Supplemental Spec~Use only in accordance with the Traffic Engineering Manual (TEM) Part 6, Section 640-29.1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_07212017_for_2023.pdf 897~Pavement Fine and Micro Planing~2013~1/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/897_01162015_for_2013.pdf 897~Pavement Fine and Micro Planing~2016~1/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/897_01162015_for_2016.PDF 897~Pavement Fine and Micro Planing~2019~1/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/897_01162015_for_2019.PDF 897~Pavement Fine and Micro Planing~2023~1/16/2015~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/897_01162015_for_2023.PDF 898~WIRELESS MAGNETOMETER DETECTION SYSTEM~2019~7/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_07162021_for_2019.pdf 898~Wireless Magnetometer Detection System~2023~7/16/2021~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_07162021_for_2023.pdf 899~Cured-In-Place Pipe Liner~2019~1/20/2023~Active~Supplemental Spec~Perform a hydraulic analysis showing the lined pipe provides a flow capacity equal to, or greater than, that of the host pipe prior to rehabilitation. Consider another rehabilitation method when voids exist in the host pipe backfill.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/899_01202023_for_2019.pdf 899~Close-Fit Pipe~2023~1/16/2026~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/899_01162026_for_2023.pdf 902~Conduit Inspection Equipment~2010~1/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_09192011(final).pdf 902~Conduit Inspection Equipment~2013~12/31/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_12312012_for_2013.PDF 902~Conduit Inspection Equipment~2016~12/31/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_12312012_for_2016.PDF 902~Conduit Inspection Equipment~2019~7/19/2019~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_07192019_for_2019.pdf 902~Conduit Inspection Equipment~2023~1/16/2026~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_01162026_for_2023.pdf 903~GPS (global positioning system) Clock Assembly~2010~7/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/903_07202012.pdf 903~GPS (global positioning system) Clock Assembly~2013~7/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/903_07202012_for_2013.PDF 903~GPS (global positioning system) Clock Assembly~2016~7/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/903_07202012_for_2016.PDF 903~GPS (global positioning system) Clock Assembly~2019~7/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/903_07202012_for_2019.PDF 903~GPS (global positioning system) Clock Assembly~2023~7/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/903_07202012_for_2023.PDF 904~Fiber Optic Cable And Components~2019~7/15/2022~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07152022_for_2019.pdf 904~Fiber Optic Cable And Components~2023~7/15/2022~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07152022_for_2023.pdf 905~Wet Reflective Optics Materials~2019~4/17/2020~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/905_04172020_for_2019.pdf 905~Wet Reflective Optics Materials~2023~1/17/2025~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/905_01172025_for_2023.pdf 906~Spread Spectrum Radio~2005~1/19/2007~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_01192007_for_2005.PDF 906~Spread Spectrum Radio~2008~10/17/2008~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10172008 for 2008.pdf 906~Spread Spectrum Radio~2010~10/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10152010.pdf 906~Spread Spectrum Radio~2013~10/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10152010_for_2013.PDF 906~Spread Spectrum Radio~2016~10/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10152010_for_2016.PDF 906~Spread Spectrum Radio~2019~10/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10152010_for_2019.PDF 906~Spread Spectrum Radio~2023~10/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10152010_for_2023.PDF 907~Video Detection System~2005~1/19/2007~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01192007_for_2005.PDF 907~Video Detection System~2008~1/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01152010_for_2008.PDF 907~Video Detection System~2008~10/17/2008~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_10172008 for 2008.pdf 907~Video Detection System~2010~1/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 907 012012(final).pdf 907~Video Detection System~2013~1/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01202012_for_2013.PDF 907~Video Detection System~2016~1/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01202012_for_2016.PDF 907~Video Detection System~2019~10/18/2019~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_10182019_for_2019.pdf 907~Video Detection System~2023~10/18/2019~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_10182019_for_2023.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2013~1/29/2016~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_01292016_for_2013.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2016~10/20/2017~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_10202017_for_2016.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2019~10/20/2017~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_10202017_for_2019.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2023~1/17/2025~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_01172025_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2019~7/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07212023_for_2019.pdf 909~Intelligent Transportation System (ITS) Devices and Components~2023~1/16/2026~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_01162026_for_2023.pdf 910~Vital Inductive Loop Processor System~2016~1/20/2017~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/910_01202017_for_2016.pdf 910~Vital Inductive Loop Processor System~2019~1/20/2017~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/910_01202017_for_2019.pdf 910~Vital Inductive Loop Processor System~2023~1/20/2017~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/910_01202017_for_2023.pdf 913~Luminaire, Solid-State (LED)~2019~4/16/2021~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_04162021_for_2019.pdf 913~Luminaire, Solid-State (LED)~2023~4/16/2021~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_04162021_for_2023.pdf 914~Heat-Fused Preformed Thermoplastic Shield Pavement Marking Material~2013~4/15/2016~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/914_04152016_for_2013.pdf 914~Heat-Fused Preformed Thermoplastic Shield Pavement Marking Material~2016~7/15/2016~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/914_07152016_for_2016.pdf 914~Heat-Fused Preformed Thermoplastic Shield Pavement Marking Material~2019~7/15/2016~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/914_07152016_for_2019.pdf 914~Heat-Fused Preformed Thermoplastic Shield Pavement Marking Material~2023~7/15/2016~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/914_07152016_for_2023.pdf 916~Coating Of Light Supports And Signal Supports And Components Over Hot-Dip Galvanized Steel Or Aluminum~2023~7/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_07192024_for_2023.pdf 917~Spray Thermoplastic Pavement Marking~2010~10/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/917_10152010.pdf 918~Programmable Logic Controller (PLC)~2013~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/918_04182014_for_2013.pdf 918~Programmable Logic Controller (PLC)~2016~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/918_04182014_for_2016.PDF 918~Programmable Logic Controller (PLC)~2019~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/918_04182014_for_2019.PDF 918~Programmable Logic Controller (PLC)~2023~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/918_04182014_for_2023.PDF 919~Railroad Preemption Interface~2019~1/17/2020~Active~Supplemental Spec~ODOT Standard Construction Drawing TC-86.10 is a schematic drawing depicting the interface described in this Supplemental Specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01172020_for_2019.pdf 919~Railroad Preemption Interface~2023~1/17/2020~Active~Supplemental Spec~ODOT Standard Construction Drawing TC-86.10 is a schematic drawing depicting the interface described in this Supplemental Specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01172020_for_2023.pdf 921~Arrow Boards~2023~7/19/2024~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/921_07192024_for_2023.pdf 927~Self-Lubricating Bronze Bearing Plates~2005~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2005.PDF 927~Self-Lubricating Bronze Bearing Plates~2008~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2008.PDF 927~Self-Lubricating Bronze Bearing Plates~2010~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2010.PDF 927~Self-Lubricating Bronze Bearing Plates~2013~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2013.PDF 927~Self-Lubricating Bronze Bearing Plates~2016~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2016.PDF 927~Self-Lubricating Bronze Bearing Plates~2019~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2019.PDF 927~Self-Lubricating Bronze Bearing Plates~2023~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/927_04152005_for_2023.PDF 928~LED Blank-Out Sign~2016~1/19/2018~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/928_01192018_for_2016.pdf 928~LED Blank-Out Sign~2019~1/19/2018~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/928_01192018_for_2019.pdf 928~LED Blank-Out Sign~2023~1/19/2018~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/928_01192018_for_2023.pdf 929~Work Zone Egress Warning System Materials~2016~1/20/2017~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/929_01202017_for_2016.pdf 929~Work Zone Egress Warning System Materials~2019~7/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/929_07212023_for_2019.pdf 929~Work Zone Egress Warning System Materials~2023~7/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/929_07212023_for_2023.pdf 930~Automated Flagger Assistance Device~2010~4/20/2012~Active~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 930_04202012.pdf 930~Automated Flagger Assistance Device~2013~1/17/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/930_01172014_for_2013.pdf 930~Automated Flagger Assistance Device~2016~1/17/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/930_01172014_for_2016.PDF 930~Automated Flagger Assistance Device~2019~7/19/2019~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/930_07192019_for_2019.pdf 930~Automated Flagger Assistance Device~2023~7/19/2019~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/930_07192019_for_2023.pdf 931~Longitudinal Channelizing Device Materials~2019~4/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/931_04212023_for_2019.pdf 931~Longitudinal Channelizing Device Materials~2023~4/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/931_04212023_for_2023.pdf 936~Geosynthetic Cementitious Composite Mat~2023~7/19/2024~Active~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/936_07192024_for_2023.pdf 937~Polyethylene Liner Pipe~2005~4/20/2007~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_04152005_for_2005.PDF 937~Polyethylene Liner Pipe~2005~4/20/2007~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_04202007_for_2005.PDF 937~Polyethylene Liner Pipe~2013~10/16/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_10162015_for_2013.pdf 938~Steel Reinforced Thermoplastic Ribbed Pipe~2019~1/19/2018~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/938_01192018_for_2019.pdf 939~Precast and Cast-in-Place Trench Drain~2019~1/17/2020~Active~Supplemental Spec~Provide SS 839 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For design criteria and guidance contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_01172020_for_2019.pdf 939~Precast and Cast-in-Place Trench Drain~2023~1/17/2020~Active~Supplemental Spec~Provide SS 839 when using this specification.  This specification replaces the plan note formerly used for Trench Drains.  For design criteria and guidance contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_01172020_for_2023.pdf 940~14 Ft To 20 Ft Precast Reinforced Concrete Box Culverts Designed According To AASHTO LRFD~2013~4/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/940_04172015_for_2013.pdf 940~14 Ft To 20 Ft Precast Reinforced Concrete Box Culverts Designed According To AASHTO LRFD~2016~4/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/940_04172015_for_2016.PDF 940~14 Ft To 20 Ft Precast Reinforced Concrete Box Culverts Designed According To AASHTO LRFD~2019~4/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/940_04172015_for_2019.PDF 940~14 Ft To 20 Ft Precast Reinforced Concrete Box Culverts Designed According To AASHTO LRFD~2023~4/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/940_04172015_for_2023.PDF 953~Latex for Concrete Modification~2005~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2005.PDF 953~Latex for Concrete Modification~2008~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2008.PDF 953~Latex for Concrete Modification~2010~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2010.PDF 953~Latex for Concrete Modification~2013~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2013.PDF 953~Latex for Concrete Modification~2016~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2016.PDF 953~Latex for Concrete Modification~2019~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2019.PDF 953~Latex for Concrete Modification~2023~4/15/2005~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/953_04152005_for_2023.PDF 961~Portable Traffic Signals~2019~4/17/2020~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_04172020_for_2019.pdf 961~Portable Traffic Signals~2023~4/17/2020~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_04172020_for_2023.pdf 987~Removable, Nonreflective, Preformed Blackout Tape~2008~1/16/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/987_01162009_for_2008.PDF 987~Removable, Nonreflective, Preformed Blackout Tape~2010~1/16/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/987_01162009_for_2010.PDF 987~Removable, Nonreflective, Preformed Blackout Tape~2013~1/16/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/987_01162009_for_2013.PDF 987~Removable, Nonreflective, Preformed Blackout Tape~2016~1/16/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/987_01162009_for_2016.PDF 987~Removable, Nonreflective, Preformed Blackout Tape~2019~1/16/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/987_01162009_for_2019.PDF 987~Removable, Nonreflective, Preformed Blackout Tape~2023~1/16/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/987_01162009_for_2023.PDF 992~Extrusheet Sign Aluminum Mounting Clip Testing Procedure~2013~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/992_04182014_for_2013.pdf 992~Extrusheet Sign Aluminum Mounting Clip Testing Procedure~2016~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/992_04182014_for_2016.PDF 992~Extrusheet Sign Aluminum Mounting Clip Testing Procedure~2019~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/992_04182014_for_2019.PDF 992~Extrusheet Sign Aluminum Mounting Clip Testing Procedure~2023~4/18/2014~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/992_04182014_for_2023.PDF 995~Precast Water Quality Structure~2005~4/20/2007~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_04202007_for_2005.PDF 995~Precast Water Quality Structure~2008~1/15/2010~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_01152010_for_2008.PDF 995~Precast Water Quality Structure~2008~4/17/2009~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_04172009_for_2008.PDF 995~Precast Water Quality Structure~2010~1/20/2012~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_2010-10-15(final).pdf 995~Precast Water Quality Structure~2013~7/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_07172015_for_2013.pdf 995~Precast Water Quality Structure~2016~7/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_07172015_for_2016.PDF 995~Precast Water Quality Structure~2019~7/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_07172015_for_2019.PDF 995~Precast Water Quality Structure~2023~7/17/2015~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_07172015_for_2023.PDF 996~Work Zone Queue Detection Warning System Materials~2016~7/15/2016~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/996_07152016_for_2016.pdf 996~Work Zone Queue Detection Warning System Materials~2019~7/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/996_07212023_for_2019.pdf 996~Work Zone Queue Detection Warning System Materials~2023~7/21/2023~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/996_07212023_for_2023.pdf 997~Rectangular Rapid Flashing Beacon (RRFB) Sign Assembly~2023~1/16/2026~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/997_01162026_for_2023.pdf 998~WIRELESS MAGNETOMETER DETECTION SYSTEM~2019~7/16/2021~Active~Supplemental Spec~ See Supplemental Spec 898 for application information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/998_07162021_for_2019.pdf 998~Wireless Magnetometer Detection System~2023~7/16/2021~Active~Supplemental Spec~See Supplemental Spec 898 for application information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/998_07162021_for_2023.pdf 999~Rectangular Rapid Flashing Beacon (RRFB) Sign Assembly~2023~1/16/2026~Active~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/999_01162026_for_2023.pdf 800~Revisions To The 2005 Construction & Material Specifications~2005~7/18/2008~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2005 Construction and Materials Specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07182008_for_2005.pdf 800~Revisions To The 2005 Construction & Material Specifications~2005~4/18/2008~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04182008_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~1/18/2008~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01182008_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~10/19/2007~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2005 Construction and Materials Specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10192007_for_2005.pdf 800~Revisions To The 2005 Construction & Material Specifications~2005~7/20/2007~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2005 Construction and Materials Specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07202007_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~4/20/2007~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04202007_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~1/19/2007~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01192007_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~10/20/2006~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2005 Construction and Materials Specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10202006_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~7/21/2006~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2005 Construction and Materials Specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07212006_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~4/21/2006~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04212006_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~4/21/2006~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04212006_for_2005 Revised.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~1/20/2006~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01202006_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~10/21/2005~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2005 Construction and Materials Specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10212005_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~7/15/2005~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07152005_for_2005.PDF 800~Revisions To The 2005 Construction & Material Specifications~2005~4/15/2005~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04152005_for_2005.PDF 800~Revisions To The 2008 Construction & Material Specifications~2008~4/16/2010~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2008_04162010 for 2008.PDF 800~Revisions To The 2008 Construction & Material Specifications~2008~1/15/2010~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2008_01152010_for_2008.PDF 800~Revisions To The 2008 Construction & Material Specifications~2008~10/16/2009~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10162009_for_2008.pdf 800~Revisions To The 2008 Construction & Material Specifications~2008~7/17/2009~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07172009_for_2008.pdf 800~Revisions To The 2008 Construction & Material Specifications~2008~4/17/2009~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04172009_for_2008.PDF 800~Revisions To The 2008 Construction & Material Specifications~2008~1/16/2009~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01162009_for_2008.PDF 800~Revisions To The 2008 Construction & Material Specifications~2008~10/17/2008~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2008_10172008_for_2008.pdf 800~Revisions To The 2008 Construction & Material Specifications~2008~7/18/2008~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2008_07182008_for_2008.pdf 800~Revisions To The 2008 Construction & Material Specifications~2008~4/18/2008~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2008_04182008_for_2008.PDF 800~REVISIONS TO THE 2010 CONSTRUCTION & MATERIAL SPECIFICATIONS~2010~7/19/2013~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07192013_for_2010.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~4/19/2013~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04192013_for_2010.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~1/18/2013~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01182013_for_2010.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~10/19/2012~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_10192012_for_2010.pdf 800~Revisions to the 2010 Construction and Material Specification~2010~7/20/2012~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_2010_7202012 for 2010.pdf 800~Revisions to the 2010 Construction and Material Specification~2010~5/25/2012~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_2010_5272012.pdf 800~Revisions to the 2010 Construction and Material Specification~2010~4/20/2012~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_2010_4202012.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~1/20/2012~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_1202012.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~10/21/2011~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_10212011.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~7/15/2011~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_7162011.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~4/15/2011~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_4152011.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~1/21/2011~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_1212011.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~10/15/2010~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_10152010_for_2010.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~7/16/2010~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2010_07162010 for 2010.PDF 800~Revisions To The 2010 Construction & Material Specifications~2010~4/16/2010~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800-2010_04162010 for 2010.pdf 800~Revisions To The 2010 Construction & Material Specifications~2010~1/20/2010~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800-2010_11082010_for_2010 special posting.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~7/15/2016~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07152016_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~4/15/2016~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04152016_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~1/15/2016~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_01152016_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~10/16/2015~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_10162015_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~7/17/2015~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07172015_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~4/17/2015~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04172015_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~1/21/2015~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_01212015_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~1/16/2015~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_01162015_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~10/17/2014~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_10172014_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~7/18/2014~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07182014_for_2013.pdf 800~REVISIONS TO THE 2013 CONSTRUCTION & MATERIAL SPECIFICATIONS~2013~4/18/2014~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04182014_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~1/17/2014~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_01172014_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~10/18/2013~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_10182013_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~7/19/2013~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07192013_for_2013.pdf 800~Revisions To The 2013 Construction & Material Specifications~2013~4/19/2013~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04192013_for_2013.pdf 800~Revisions To The 2016 Construction & Material Specifications~2016~7/19/2019~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS800_07192019_for_2016.pdf 800~Revisions To The 2016 Construction & Material Specifications~2016~4/19/2019~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04192019_for_2016.pdf 800~Revisions To The 2016 Construction & Material Specifications~2016~1/18/2019~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01182019_for_2016.pdf 800~Revisions to The 2016 Construction & Material Specifications~2016~10/19/2018~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project. Letting dates are avai~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10192018_for_2016.pdf 800~Revisions To The 2016 Construction & Material Specifications~2016~7/20/2018~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07202018_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~4/20/2018~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04202018_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~1/19/2018~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_01192018_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~10/20/2017~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_10202017_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~7/21/2017~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07212017_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~4/21/2017~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04212017_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~1/20/2017~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_01202017_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~10/21/2016~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_10212016_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~7/15/2016~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_07152016_for_2016.pdf 800~Revisions to the 2016 Construction & Material Specifications~2016~4/15/2016~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/CMS800_04152016_for_2016.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~7/21/2023~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07212023_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~4/21/2023~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04212023_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~1/20/2023~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01202023_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~10/21/2022~Archive~Supplemental Spec~The current revision date used on the Proposal Cover should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10212022_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~7/15/2022~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07152022_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~5/2/2022~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_05022022_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~4/15/2022~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04152022_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~1/21/2022~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01212022_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~10/15/2021~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10152021_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~7/16/2021~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07162021_for_2019.pdf 800~REVISIONS TO THE 2019 CONSTRUCTION & MATERIAL SPECIFICATIONS~2019~4/16/2021~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04162021_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~1/15/2021~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01152021_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~10/16/2020~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10162020_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~7/17/2020~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2019 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07172020_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~4/17/2020~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04172020_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~1/17/2020~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS800_01172020_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~10/18/2019~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS800_10182019_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~7/19/2019~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS800_07192019_for_2019.pdf 800~Revisions To The 2019 Construction & Material Specifications~2019~4/19/2019~Archive~Supplemental Spec~The current revision date used on the Title Sheet should match the quarterly revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04192019_for_2019.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~7/18/2025~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2023 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07182025_for_2023.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~1/17/2025~Archive~Supplemental Spec~Designers should use the most current and applicable SS800 prior to the Plan Package Due milestone. https://www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Pages/letting-schedule.aspx~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01172025_for_2023.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~7/19/2024~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2023 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07192024_for_2023.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~1/19/2024~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2023 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_01192024_for_2023.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~10/20/2023~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2023 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_10202023_for_2023.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~7/21/2023~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2023 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_07212023_for_2023.pdf 800~Revisions To The 2023 Construction & Material Specifications~2023~4/21/2023~Archive~Supplemental Spec~This Supplemental Specification must be used on all projects using the 2023 Construction and Materials Specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/800_04212023_for_2023.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2008~10/20/2008~Archive~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_10202008 for 2008.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2008~4/15/2005~Archive~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_04152005_for_2008.PDF 802~Constructing and Inspecting Pipe Culverts, Sewers, Drains, and Drainage Structures~2010~4/15/2011~Archive~Supplemental Spec~This specification permits the Contractor to install drainage conduit and drainage structures under a performance specification. Add to all jobs that have any Item 603 or Item 604 work.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_2011-04-15.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2010~1/21/2011~Archive~Supplemental Spec~This specification permits the Contractor to install drainage conduit and drainage structures under a performance specification. Add to all jobs that have any Item 603 or Item 604 work. No other changes are required. This specification also incorporates 9~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_2011-01-21.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2010~10/15/2010~Archive~Supplemental Spec~This specification permits the Contractor to install drainage conduit and drainage structures under a performance specification. Add to all jobs that have any Item 603 or Item 604 work. No other changes are required. This specification also incorporate~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_2010-10-15.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2010~4/16/2010~Archive~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_04162010 for 2010.pdf 802~Post Construction Inspection of Storm Sewers and Drainage Structures~2010~1/15/2010~Archive~Supplemental Spec~Add to all jobs that have any 603 Type B or C Storm Sewers or any 604 catch basins or manholes. No other changes are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/802_01152010_for_2010.PDF 803~Rubberized Open Graded Asphalt Friction Course~2005~4/15/2005~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_04152005_for_2005.PDF 803~Rubberized Open Graded Asphalt Friction Course~2008~1/16/2009~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_01162009_for_2008.PDF 803~Rubberized Open Graded Asphalt Friction Course~2008~4/18/2008~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_04182008_for_2008.PDF 803~Rubberized Open Graded Asphalt Friction Course~2010~1/16/2009~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_01162009_for_2010.PDF 803~Rubberized Open Graded Asphalt Friction Course~2013~12/31/2012~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_12312012_for_2013.pdf 803~Rubberized Open Graded Asphalt Friction Course~2016~1/15/2016~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_01152016_for_2016.pdf 803~Rubberized Open Graded Asphalt Friction Course~2019~1/15/2016~Archive~Supplemental Spec~Use where surface water drainage is a concern, a high skid condition exists or it is desired to control sound in abnormally high sound problem areas.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/803_01152016_for_2019.pdf 804~Fiber Optic Cable For Traffic Signal Interconnet~2005~1/19/2007~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01192007_for_2005.PDF 804~Fiber Optic Cable For Traffic Signal Interconnet~2008~1/19/2007~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01192007_for_2008.PDF 804~Fiber Optic Cable For Traffic Signal Interconnet~2010~1/19/2007~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01192007_for_2010.PDF 804~Fiber Optic Cable And Components~2013~1/16/2015~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01162015_for_2013.pdf 804~Fiber Optic Cable and Components~2013~4/18/2014~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_04182014_for_2013.pdf 804~Fiber Optic Cable For Traffic Signal Interconnet~2013~7/19/2013~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07192013_for_2013.pdf 804~Fiber Optic Cable For Traffic Signal Interconnet~2013~1/19/2007~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01192007_for_2013.PDF 804~Fiber Optic Cable And Components~2016~10/19/2018~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_10192018_for_2016.pdf 804~Fiber Optic Cable and Components~2016~1/20/2017~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01202017_for_2016.pdf 804~Fiber Optic Cable and Components~2016~7/15/2016~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07152016_for_2016.pdf 804~Fiber Optic Cable And Components~2016~1/15/2016~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01152016_for_2016.pdf 804~Fiber Optic Cable and Components~2019~10/21/2022~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_10212022_for_2019.pdf 804~Fiber Optic Cable And Components~2019~7/15/2022~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07152022_for_2019.pdf 804~Fiber Optic Cable And Components~2019~4/15/2022~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_04152022_for_2019.pdf 804~Fiber Optic Cable And Components~2019~1/21/2022~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01212022_for_2019.pdf 804~Fiber Optic Cable And Components~2019~10/15/2021~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_10152021_for_2019.pdf 804~FIBER OPTIC CABLE AND COMPONENTS~2019~7/16/2021~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07162021_for_2019.pdf 804~Fiber Optic Cable And Components~2019~1/15/2021~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01152021_for_2019.pdf 804~Fiber Optic Cable And Components~2019~7/17/2020~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07172020_for_2019.pdf 804~Fiber Optic Cable And Components~2019~4/17/2020~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_04172020_for_2019.pdf 804~Fiber Optic Cable and Components~2019~7/19/2019~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07192019_for_2019.pdf 804~Fiber Optic Cable and Components~2019~1/18/2019~Archive~Supplemental Spec~This specification shall be used for any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01182019_for_2019.pdf 804~Fiber Optic Cable And Components~2023~7/18/2025~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07182025_for_2023.pdf 804~Fiber Optic Cable And Components~2023~1/17/2025~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01172025_for_2023.pdf 804~Fiber Optic Cable And Components~2023~7/19/2024~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_07192024_for_2023.pdf 804~Fiber Optic Cable And Components~2023~1/19/2024~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01192024_for_2023.pdf 804~Fiber Optic Cable and Components~2023~1/20/2023~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/804_01202023_for_2023.pdf 806~Asphalt Concrete With Joint Density For Multi-Lane Highways~2019~3/2/2015~Archive~Supplemental Spec~This specification is intended for use on limited access, multi-lane facilities, with controlled grades and cross slopes. (Contact the Office of Construction Administration prior to specifying this note.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/806_03022015_for_2019.PDF 807~WET REFLECTIVE LIQUID APPLIED PAVEMENT MARKINGS~2019~7/16/2021~Archive~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime permanent wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_07162021_for_2019.pdf 807~Wet Reflective Liquid Applied Pavement Markings~2019~7/17/2020~Archive~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_07172020_for_2019.pdf 807~Wet Reflective Liquid Applied Pavement Markings~2019~4/17/2020~Archive~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_04172020_for_2019.pdf 807~Wet Reflective Liquid Applied Pavement Markings~2019~1/17/2020~Archive~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_01172020_for_2019.pdf 807~Wet Reflective Liquid Applied Pavement Markings~2023~1/21/2022~Archive~Supplemental Spec~Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime permanent wet reflective pavement markings are specified.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/807_01212022_for_2023.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2013~1/29/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01292016_for_2013.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2013~10/16/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_10162015_for_2013.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2013~1/16/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01162015_for_2013.pdf 808~DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY~2016~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01182019_for_2016.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2016~7/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_07202018_for_2016.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2016~1/20/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01202017_for_2016.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2016~1/29/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01292016_for_2016.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2016~10/16/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_10162015_for_2016.PDF 808~Digital Speed Limit (DSL) Sign Assembly~2019~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01182019_for_2019.pdf 808~Digital Speed Limit (DSL) Sign Assembly~2023~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/808_01182019_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2013~1/15/2016~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01152016_for_2013.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2013~1/16/2015~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01162015_for_2013.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2013~7/18/2014~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07182014_for_2013.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2016~10/19/2018~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_10192018_for_2016.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2016~1/19/2018~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01192018_for_2016.pdf 809~Intelligent Transportation System (ITS) Devices and Components~2016~7/21/2017~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07212017_for_2016.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2016~4/15/2016~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_04152016_for_2016.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2016~1/15/2016~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01152016_for_2016.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~4/21/2023~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_04212023_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~1/20/2023~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01202023_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices and Components~2019~10/21/2022~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_10212022_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~7/15/2022~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07152022_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~4/15/2022~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_04152022_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~1/21/2022~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01212022_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~10/15/2021~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_10152021_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~7/16/2021~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07162021_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~4/16/2021~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_04162021_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~1/15/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01152021_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~10/16/2020~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_10162020_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~7/17/2020~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07172020_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~1/17/2020~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01172020_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices and Components~2019~10/18/2019~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_10182019_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~7/19/2019~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07192019_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2019~1/18/2019~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01182019_for_2019.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~7/18/2025~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07182025_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~1/17/2025~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01172025_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~7/19/2024~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07192024_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~1/19/2024~Archive~Supplemental Spec~Designer Note: Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01192024_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~10/20/2023~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_10202023_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~7/21/2023~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_07212023_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~4/21/2023~Archive~Supplemental Spec~Include this specification on any project that contains INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AND COMPONENTS.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_04212023_for_2023.pdf 809~Intelligent Transportation System (ITS) Devices And Components~2023~1/20/2023~Archive~Supplemental Spec~This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/809_01202023_for_2023.pdf 810~Vital Inductive Loop Processor~2013~4/17/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/810_04172015_for_2013.pdf 810~Vital Inductive Loop Processor System~2016~1/20/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/810_01202017_for_2016.pdf 810~Vital Inductive Loop Processor~2016~4/17/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/810_04172015_for_2016.PDF 811~Asphalt Undersealing of Existing Concrete Pavement~2005~4/15/2005~Archive~Supplemental Spec~For use on Local Projects Only. Specification is NOT permitted for use on ODOT projects~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/811_04152005_for_2005.PDF 811~Asphalt Undersealing of Existing Concrete Pavement~2008~4/18/2008~Archive~Supplemental Spec~For use on Local Projects Only. Specification is NOT permitted for use on ODOT projects~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/811_04182008_for_2008.PDF 811~Conduit and Drainage Structures~2013~1/18/2013~Archive~Supplemental Spec~For use on Local Projects Only. Specification is NOT permitted for use on ODOT projects~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/811_01182013_for_2013.pdf 812~Grout Subsealing of Existing Concrete Pavement~2005~4/15/2005~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_04152005_for_2005.PDF 812~Grout Subsealing of Existing Concrete Pavement~2008~1/15/2010~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_01152010_for_2008.PDF 812~Grout Subsealing of Existing Concrete Pavement~2008~4/18/2008~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_04152005_for_2008.PDF 812~Grout Subsealing of Existing Concrete Pavement~2010~1/15/2010~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_01152010_for_2010.PDF 812~Grout Subsealing of Existing Concrete Pavement~2013~1/15/2010~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/812_01152010_for_2013.PDF 813~Luminaire, Solid-State (LED)~2013~4/17/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_04172015_for_2013.pdf 813~Luminaire, Solid-State (LED)~2013~1/16/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_01162015_for_2013.pdf 813~Luminaire, Solid-State (LED)~2013~7/18/2014~Archive~Supplemental Spec~Use this specification on all projects that include Highway Lighting that will be using LED luminaires. Contact Kevin Duemmel for approval to use this specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_07182014_for_2013.pdf 813~Luminaire, Solid-State (LED)~2016~10/19/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_10192018_for_2016.pdf 813~Luminaire, Solid-State (LED)~2016~7/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_07202018_for_2016.pdf 813~Luminaire, Solid-State (LED)~2016~10/21/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_10212016_for_2016.pdf 813~Luminaire, Solid-State (LED)~2016~4/17/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_04172015_for_2016.PDF 813~Luminaire, Solid-State (LED)~2019~10/19/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_10192018_for_2019.pdf 813~Luminaire, Solid-State (LED)~2023~10/19/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/813_10192018_for_2023.pdf 814~Heat-Fused Preformed Thermoplastic Shield Pavement Marking~2013~4/15/2016~Archive~Supplemental Spec~This Supplemental Specification is to be used for any project with Heat-Fused Preformed Thermoplastic Shield Pavement Marking~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/814_04152016_for_2013.pdf 814~Heat-Fused Preformed Thermoplastic Shield Pavement Marking~2016~4/15/2016~Archive~Supplemental Spec~This Supplemental Specification is to be used for any project with Heat-Fused Preformed Thermoplastic Shield Pavement Marking~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/814_04152016_for_2016.pdf 815~Spread Spectrum Radio~2005~1/19/2007~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_01192007 for 2005.PDF 815~Spread Spectrum Radio~2008~1/19/2007~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_01192007_for_2008.PDF 815~Spread Spectrum Radio~2010~1/19/2007~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_01192007_for_2010.PDF 815~Spread Spectrum Radio~2013~1/19/2007~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_01192007_for_2013.PDF 815~Spread Spectrum Radio~2016~4/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_04202018_for_2016.pdf 815~Spread Spectrum Radio~2016~1/19/2007~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_01192007_for_2016.PDF 815~Spread Spectrum Radio~2019~4/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/815_04202018_for_2019.pdf 816~Video Detection System~2010~1/19/2007~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01192007_for_2010.PDF 816~Video Detection System~2016~7/20/2018~Archive~Supplemental Spec~This is a detection item and not suitable for traffic surveillance. ODOT discourages the use video detection at its traffic signals, preferring instead stop bar and advance radar detection. See TEM 420-5.2, 420-5.3 and the Signal Design Reference Pack.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_07202018_for_2016.pdf 816~Video Detection System~2016~1/20/2012~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01202012_for_2016.PDF 816~Video Detection System~2019~7/19/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_07192019_for_2019.pdf 816~Video Detection System~2019~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/816_01182019_for_2019.pdf 817~Spray Thermoplastic Pavement Marking~2010~4/15/2011~Archive~Supplemental Spec~For use in accordance with the 2010 C&MS on all projects using spray thermoplastic pavement marking material~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 817.pdf 817~Spray Thermoplastic Pavement Marking~2010~7/16/2010~Archive~Supplemental Spec~For use in accordance with the 2010 C&MS on all projects using spray thermoplastic pavement marking material~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/817_07162010_for_2010.pdf 818~Programmable Logic Controller (PLC)~2013~4/18/2014~Archive~Supplemental Spec~This specification shall be used for highway lighting in a tunnel.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/818_04182014_for_2013.pdf 818~Programmable Logic Controller (PLC)~2016~4/18/2014~Archive~Supplemental Spec~This specification shall be used for highway lighting in a tunnel.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/818_04182014_for_2016.PDF 819~Railroad Preemption Interface~2013~1/15/2016~Archive~Supplemental Spec~Refer to the TEM Parts 4 and 8 for additional information about Railroad Preemption. IMPORTANT: Project Managers and Designers should contact the Ohio Rail Development Commission (ORDC)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_01152016_for_2013.pdf 819~Railroad Preemption Interface~2013~4/17/2015~Archive~Supplemental Spec~Refer to the TEM Parts 4 and 8 for additional information about Railroad Preemption. IMPORTANT: Project Managers and Designers should contact the Ohio Rail Development Commission (ORDC)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_04172015_for_2013.pdf 819~Railroad Preemption Interface~2013~1/17/2014~Archive~Supplemental Spec~Refer to the TEM Parts 4 and 8 for additional information about Railroad Preemption. IMPORTANT: Project Managers and Designers should contact the Ohio Rail Development Commission (ORDC)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_01172014_for_2013.pdf 819~Railroad Preemption Interface~2016~1/15/2016~Archive~Supplemental Spec~Refer to the TEM Parts 4 and 8 for additional information about Railroad Preemption. IMPORTANT: Project Managers and Designers should contact the Ohio Rail Development Commission (ORDC)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_01152016_for_2016.pdf 819~Railroad Preemption Interface~2019~1/15/2016~Archive~Supplemental Spec~Refer to the TEM Parts 4 and 8 for additional information about Railroad Preemption. IMPORTANT: Project Managers and Designers should contact the Ohio Rail Development Commission (ORDC)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/819_01152016_for_2019.pdf 820~Instrumentation Enclosure~2016~7/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/820_07202018_for_2016.pdf 820~Instrumentation Enclosure~2019~7/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/820_07202018_for_2019.pdf 822~Hot In Place Recycling, Intermediate Course~2005~4/15/2005~Archive~Supplemental Spec~Only specify HIR for constructing an intermediate course~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_04152005_for_2005.PDF 822~Hot In Place Recycling, Intermediate Course~2008~4/18/2008~Archive~Supplemental Spec~Only specify HIR for constructing an intermediate course~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_04182008_for_2008.PDF 822~Hot In Place Recycling, Intermediate Course~2010~4/18/2008~Archive~Supplemental Spec~Only specify HIR for constructing an intermediate course~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_04182008_for_2010.PDF 822~Hot In Place Recycling, Intermediate Course~2013~4/18/2008~Archive~Supplemental Spec~Only specify HIR for constructing an intermediate course~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_04182008_for_2013.PDF 822~Hot In Place Recycling, Intermediate Course~2016~1/15/2016~Archive~Supplemental Spec~Only specify HIR for constructing an intermediate course~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_01152016_for_2016.pdf 822~Hot In Place Recycling, Intermediate Course~2019~1/15/2016~Archive~Supplemental Spec~Only specify HIR for constructing an intermediate course~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/822_01152016_for_2019.pdf 823~Construction Layout Stakes and Survey Monuments~2010~7/20/2012~Archive~Supplemental Spec~Use this supplemental specification on all construction projects that are scoped after October 15, 2010 and that require layout stakes, Primary Project Control Monuments, Monument Assemblies, Reference Monuments, or Right-of-Way Monuments. This specifica~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_07202012 for 2010.pdf 823~Construction Layout Stakes and Survey Monuments~2010~7/15/2011~Archive~Supplemental Spec~Use this supplemental specification on all construction projects that are scoped after October 15, 2010 and that require layout stakes, Project Control Monuments, Monument Assemblies, Reference Monuments, or Right-of-Way Monuments.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_rev 2011-06-06.pdf 823~Construction Layout Stakes and Survey Monuments~2010~10/15/2010~Archive~Supplemental Spec~Use this supplemental specification on all construction projects that are scoped after October 15, 2010 and that require layout stakes, Project Control Monuments, Monument Assemblies, Reference Monuments, or Right-of-Way Monuments. This specification rep~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_2010-10-15.pdf 823~Light Traffic Asphalt Mixture Composition Requirements~2013~7/18/2014~Archive~Supplemental Spec~This item is for use in locations with little or no truck traffic (<50 trucks per day). Locations where this item may be used include state park roads, parking lots, driveways, and bike paths. This item is not for use on any state highway.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_07182014_for_2013.pdf 823~Light Traffic Asphalt Mixture Composition Requirements~2016~7/18/2014~Archive~Supplemental Spec~This item is for use in locations with little or no truck traffic (<50 trucks per day). Locations where this item may be used include state park roads, parking lots, driveways, and bike paths. This item is not for use on any state highway.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_07182014_for_2016.PDF 823~Light Traffic Asphalt Mixture Composition Requirements~2019~7/18/2014~Archive~Supplemental Spec~This item is for use in locations with little or no truck traffic (<50 trucks per day). Locations where this item may be used include state park roads, parking lots, driveways, and bike paths. This item is not for use on any state highway.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_07182014_for_2019.PDF 823~Light Traffic Asphalt Mixture Composition Requirements~2023~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/823_01212022_for_2023.pdf 824~System Analysis~2013~4/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_04152016_for_2013.pdf 824~System Analysis~2016~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_01182019_for_2016.pdf 824~System Analysis~2016~1/19/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_01192018_for_2016.pdf 824~System Analysis~2016~4/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_04152016_for_2016.pdf 824~System Analysis~2019~1/20/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_01202023_for_2019.pdf 824~System Analysis~2019~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_01182019_for_2019.pdf 824~System Analysis~2023~1/20/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/824_01202023_for_2023.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2016~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_01182019_for_2016.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2016~7/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_07202018_for_2016.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2016~7/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_07152016_for_2016.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2019~4/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_04212023_for_2019.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2019~1/17/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_01172020_for_2019.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2019~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_01182019_for_2019.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2023~4/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_04212023_for_2023.pdf 825~Arc-Flash Hazard Calculations And Equipment Label~2023~1/17/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/825_01172020_for_2023.pdf 826~Asphalt Concrete with Fibers~2005~4/15/2005~Archive~Supplemental Spec~A This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. B Use this item just as any 448 item would be used in the Pavement Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_04152005_for_2005.PDF 826~Asphalt Concrete with Fibers~2008~4/18/2008~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. Use this item just as any 448 item would be used in the Pavement Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_04182008_for_2008.PDF 826~Asphalt Concrete with Fibers~2010~4/18/2008~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. Use this item just as any 448 item would be used in the Pavement Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_04182008_for_2010.PDF 826~Asphalt Concrete With Fibers~2013~7/17/2015~Archive~Supplemental Spec~Type A, B, and C fibers can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. The guidelines in the Pavement Design Manual for 441 and 442 mixes with 448-acceptance apply.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_07172015_for_2013.pdf 826~Asphalt Concrete With Fibers~2013~7/18/2014~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. The guidelines in the Pavement Design Manual for 441 and 442 mixes with 448-acceptance apply.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_07182014_for_2013.pdf 826~Asphalt Concrete with Fibers~2013~4/18/2008~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. Use this item just as any 448 item would be used in the Pavement Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_04182008_for_2013.PDF 826~Asphalt Concrete with Fibers~2016~4/15/2016~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. Use this item just as any 448 item would be used in the Pavement Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_04152016_for_2016.pdf 826~Asphalt Concrete with Fibers~2016~1/15/2016~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. Use this item just as any 448 item would be used in the Pavement Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_01152016_for_2016.pdf 826~Asphalt Concrete with Fibers~2019~1/15/2016~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. Use this item just as any 448 item would be used in the Pavement Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_01152016_for_2019.pdf 826~Asphalt Concrete With Fibers~2023~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/826_01212022_for_2023.pdf 827~Full Depth Reclamation With Cement~2023~7/19/2024~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/827_07192024_for_2023.pdf 830~Automated Flagger Assistance Device~2013~4/20/2012~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/830_04202012_for_2013.PDF 830~Automated Flagger Assistance Device~2019~1/17/2014~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/830_01172014_for_2019.PDF 831~Longitudinal Channelizing Device~2016~10/21/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/831_10212016_for_2016.pdf 831~Longitudinal Channelizing Device~2019~10/21/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/831_10212016_for_2019.pdf 831~Longitudinal Channelizing Device~2023~10/21/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/831_10212016_for_2023.pdf 832~Temporary Sediment and Erosion Control~2005~4/25/2006~Archive~Supplemental Spec~Provide this Supplemental Specification on all plans that have project identified Earth-Disturbing Activities (EDA). Provide anywhere C&MS Item 659 Seeding, SS 870 Seeding, C&MS Item 660 Sodding, or SS 870 Sodding is being furnished. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_04252006_for_2005.PDF 832~Temporary Sediment and Erosion Control~2005~4/21/2006~Archive~Supplemental Spec~Provide this Supplemental Specification on all plans that have project identified Earth-Disturbing Activities (EDA). Provide anywhere C&MS Item 659 Seeding, SS 870 Seeding, C&MS Item 660 Sodding, or SS 870 Sodding is being furnished. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_04212006_for_2005.PDF 832~Temporary Sediment and Erosion Control~2005~4/16/2004~Archive~Supplemental Spec~Provide this Supplemental Specification on all plans that have project identified Earth-Disturbing Activities (EDA). Provide anywhere C&MS Item 659 Seeding, SS 870 Seeding, C&MS Item 660 Sodding, or SS 870 Sodding is being furnished. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_04162004_for_2005.PDF 832~Temporary Sediment And Erosion Control~2008~5/5/2009~Archive~Supplemental Spec~For use on all projects. Under the Erosion Control heading, provide the following Reference Items: Item 832 Each Erosion Control - Provide an encumbered dollar value to be placed in the proposal for Item: 832 Each Erosion Control. Item 832 Lump Sum Sto~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_05052009 for 2008.PDF 832~Temporary Sediment And Erosion Control~2008~4/17/2009~Archive~Supplemental Spec~Provide this Supplemental Specification on all plans that have project identified Earth-Disturbing Activities (EDA). Provide anywhere C&MS Item 659 Seeding, SS 870 Seeding, C&MS Item 660 Sodding, or SS 870 Sodding is being furnished.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_04172009_for_2008.PDF 832~Temporary Sediment and Erosion Control~2008~4/25/2006~Archive~Supplemental Spec~Provide this Supplemental Specification on all plans that have project identified Earth-Disturbing Activities (EDA). Provide anywhere C&MS Item 659 Seeding, SS 870 Seeding, C&MS Item 660 Sodding, or SS 870 Sodding is being furnished. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_04252006_for_2008.PDF 832~Temporary Sediment And Erosion Control~2010~5/5/2009~Archive~Supplemental Spec~For use on all projects.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_05052009_for_2010.PDF 832~Temporary Sediment and Erosion Control~2013~1/17/2014~Archive~Supplemental Spec~For use on all projects.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_01172014_for_2013.pdf 832~Tempoary Sediment and Erosion Control~2013~10/18/2013~Archive~Supplemental Spec~For use on all projects.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_10182013_for_2013.pdf 832~Temporary Sediment And Erosion Control~2013~5/5/2009~Archive~Supplemental Spec~For use on all projects.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_05052009_for_2013.PDF 832~Temporary Sediment And Erosion Control~2016~10/19/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_10192018_for_2016.pdf 832~Temporary Sediment and Erosion Control~2016~1/17/2014~Archive~Supplemental Spec~For use on all projects.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_01172014_for_2016.PDF 832~Temporary Sediment And Erosion Control~2019~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_07212023_for_2019.pdf 832~Temporary Sediment And Erosion Control~2019~7/15/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_07152022_for_2019.pdf 832~Temporary Sediment And Erosion Control~2019~10/19/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_10192018_for_2019.pdf 832~Temporary Sediment And Erosion Control~2023~7/19/2024~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_07192024_for_2023.pdf 832~Temporary Sediment And Erosion Control~2023~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_07212023_for_2023.pdf 832~Temporary Sediment And Erosion Control~2023~7/15/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/832_07152022_for_2023.pdf 833~Conduit Renewal using Spray Applied Structural Liner~2013~1/16/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01162015_for_2013.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2013~7/18/2014~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Hydraulic Section of the Office of Structural Engineering~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07182014_for_2013.pdf 833~Conduit Renewal using Spray Applied Structural Liner~2013~1/17/2014~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01172014_for_2013.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2016~7/21/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07212017_for_2016.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2016~7/17/2015~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering if there are any questions.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07172015_for_2016.PDF 833~Conduit Renewal Using Spray Applied Structural Liner~2019~1/20/2023~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01202023_for_2019.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2019~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01212022_for_2019.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2019~4/17/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_04172020_for_2019.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2019~7/19/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07192019_for_2019.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2019~10/20/2017~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_10202017_for_2019.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2023~7/18/2025~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07182025_for_2023.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2023~1/17/2025~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01172025_for_2023.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2023~7/19/2024~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07192024_for_2023.pdf 833~Conduit Renewal Using Spray Applied Structural Liner~2023~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_07212023_for_2023.pdf 833~Conduit Renewal using Spray Applied Structural Liner~2023~1/20/2023~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/833_01202023_for_2023.pdf 834~Conduit Renewal Using Resin Based Liner~2010~4/16/2010~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/834_04162010 for 2010.pdf 834~Conduit Renewal Using Resin Based Liner~2013~7/17/2015~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering if there are any questions.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/834_07172015_for_2013.pdf 834~Conduit Renewal Using Resin Based Liner~2013~4/16/2010~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/834_04162010_for_2013.PDF 834~Conduit Renewal Using Resin Based Liner~2016~1/19/2018~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/834_01192018_for_2016.pdf 834~Conduit Renewal Using Resin Based Liner~2016~7/17/2015~Archive~Supplemental Spec~This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner. Contact the Office of Hydraulic Engineering if there are any questions.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/834_07172015_for_2016.PDF 836~Seeding and Erosion Control with Turf Reinforcing Mat~2005~4/15/2005~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_04152005_for_2005.PDF 836~Seeding and Erosion Control with Turf Reinforcing Mat~2008~4/15/2005~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_04152005_for_2008.PDF 836~Seeding and Erosion Control with Turf Reinforcing Mat~2010~4/15/2005~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_04152005_for_2010.PDF 836~Seeding and Erosion Control with Turf Reinforcing Mat~2013~1/18/2013~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_01182013_for_2013.pdf 836~Seeding and Erosion Control with Turf Reinforcing Mat~2013~4/15/2005~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_04152005_for_2013.PDF 836~Seeding and Erosion Control with Turf Reinforcing Mat~2016~1/19/2018~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_01192018_for_2016.pdf 836~Seeding and Erosion Control with Turf Reinforcing Mat~2016~1/18/2013~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_01182013_for_2016.PDF 836~Seeding and Erosion Control with Turf Reinforcing Mat~2019~1/19/2018~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_01192018_for_2019.pdf 836~Seeding and Erosion Control with Turf Reinforcing Mat~2023~1/19/2018~Archive~Supplemental Spec~This will be used in ditch design for velocity protection when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/836_01192018_for_2023.pdf 837~Linear Pipe~2005~4/18/2008~Archive~Supplemental Spec~Must also list Supplemental Specification 937~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_04182008_for_2005.PDF 837~Liner Pipe~2005~4/20/2007~Archive~Supplemental Spec~Must also list Supplemental Specification 937.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_04202007_for_2005.PDF 837~Liner Pipe~2005~10/20/2006~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_10202006_for_2005.PDF 837~Liner Pipe~2005~4/15/2005~Archive~Supplemental Spec~Must also list Supplemental Specification 937.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_04152005_for_2005.PDF 837~Liner Pipe~2008~4/18/2008~Archive~Supplemental Spec~Must also list Supplemental Specification 937.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_04182008_for_2008.PDF 837~Liner Pipe~2010~7/15/2011~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_revisions for july 2011_combined.pdf 837~Liner Pipe~2010~7/16/2010~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design. Specify the size and type of liner pipe. Refer to the specification for the part~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_07162010 for 2010.PDF 837~Liner Pipe~2010~4/16/2010~Archive~Supplemental Spec~Must also list Supplemental Specification 937.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_04162010 for 2010.pdf 837~Liner Pipe~2010~4/18/2008~Archive~Supplemental Spec~Must also list Supplemental Specification 937~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_04182008_for_2010.PDF 837~Liner Pipe~2013~1/17/2014~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01172014_for_2013.pdf 837~Liner Pipe~2013~1/20/2012~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01202012_for_2013.PDF 837~Liner Pipe~2016~7/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_07152016_for_2016.pdf 837~Liner Pipe~2016~1/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01152016_for_2016.pdf 837~Liner Pipe~2019~7/19/2019~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_07192019_for_2019.pdf 837~Liner Pipe~2019~10/20/2017~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits. Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_10202017_for_2019.pdf 837~Liner Pipe~2023~7/18/2025~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits.  Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_07182025_for_2023.pdf 837~Liner Pipe~2023~1/17/2025~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits.  Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01172025_for_2023.pdf 837~Liner Pipe~2023~1/19/2024~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits.  Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01192024_for_2023.pdf 837~Liner Pipe~2023~1/20/2023~Archive~Supplemental Spec~This specification is for using liner pipe to rehabilitate existing conduits.  Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/837_01202023_for_2023.pdf 838~Gabions~2005~4/15/2005~Archive~Supplemental Spec~Put this item in the contract when recommended by the Office of Structures~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_04152005_for_2005.PDF 838~Gabions~2008~4/15/2005~Archive~Supplemental Spec~Put this item in the contract when recommended by the Office of Structures~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_04152005_for_2008.PDF 838~Gabions~2010~4/15/2005~Archive~Supplemental Spec~Put this item in the contract when recommended by the Office of Structures~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_04152005_for_2010.PDF 838~Gabions~2013~4/15/2005~Archive~Supplemental Spec~Put this item in the contract when recommended by the Office of Structures~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_04152005_for_2013.PDF 838~Gabions~2016~4/15/2005~Archive~Supplemental Spec~Put this item in the contract when recommended by the Office of Structures~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_04152005_for_2016.PDF 838~Gabions~2019~4/15/2005~Archive~Supplemental Spec~Put this item in the contract when recommended by the Office of Structures~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_04152005_for_2019.PDF 838~Gabions~2023~1/15/2021~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using Gabions in consultation with the Offices of Structural, Hydraulic, or Geotechnical Engineering.  For gabion retaining walls, include quantities for excavation under Item 503.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/838_01152021_for_2023.pdf 839~Trench Drain System~2005~4/20/2007~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For Design criteria and guidance contact the Office of Structural Engineering, Hydraulics Section.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_04202007_for_2005.PDF 839~Trench Drain System~2008~4/20/2007~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For Design criteria and guidance contact the Office of Structural Engineering, Hydraulics Section.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_04202007_for_2008.PDF 839~Trench Drain System~2010~4/20/2007~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For Design criteria and guidance contact the Office of Structural Engineering, Hydraulics Section.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_04202007_for_2010.PDF 839~Trench Drain System~2013~7/17/2015~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For design criteria and guidance contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_07172015_for_2013.pdf 839~Trench Drain System~2013~12/31/2012~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For Design criteria and guidance contact the Office of Structural Engineering, Hydraulics Section.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_12312012_for_2013.PDF 839~Trench Drain System~2016~7/17/2015~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For design criteria and guidance contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_07172015_for_2016.PDF 839~Trench Drain System~2019~1/17/2020~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. For design criteria and guidance contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_01172020_for_2019.pdf 839~Trench Drain System~2019~7/17/2015~Archive~Supplemental Spec~Provide supplemental specification 939 when using this specification. This specification replaces the plan note formerly used for Trench Drains. For design criteria and guidance contact the Office of Hydraulic Engineering.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/839_07172015_for_2019.PDF 840~Mechanically Stabilized Earth Wall~2005~4/18/2008~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04182008_for_2005.PDF 840~Mechanically Stabilized Earth Wall~2005~1/19/2007~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01192007_for_2005.PDF 840~Mechanically Stabilized Earth Wall~2005~7/21/2006~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07212006_for_2005.PDF 840~Mechanically Stabilized Earth Wall~2008~7/17/2009~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07172009 for 2008.pdf 840~Mechanically Stabilized Earth Wall~2008~4/17/2009~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04172009_for_2008.PDF 840~Mechanically Stabilized Earth Wall~2008~1/16/2009~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01162009_for_2008.PDF 840~Mechanically Stabilized Earth Wall~2008~10/17/2008~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_2008_10172008 for 2008.pdf 840~Mechanically Stabilized Earth Wall~2008~4/18/2008~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04182008_for_2008.PDF 840~Mechanically Stabilized Earth Wall~2010~10/19/2012~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_10192012_for_2010.pdf 840~Mechanically Stabilized Earth wall~2010~4/20/2012~Archive~Supplemental SPec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 840_04202012.pdf 840~Mechanically Stabilized Earth Wall~2010~10/21/2011~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_2011-10-21(final).pdf 840~Mechanically Stabilized Earth Wall~2010~10/15/2010~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_2010-10-15.pdf 840~Mechanically Stabilized Earth Wall~2010~7/17/2009~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07172009_for_2010.pdf 840~Mechanically Stabilized Earth Wall~2013~4/17/2015~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04172015_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2013~10/17/2014~Archive~Supplemental Spec~See details in document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_10172014_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2013~7/18/2014~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07182014_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2013~1/17/2014~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01172014_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2013~10/18/2013~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_10182013_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2013~4/19/2013~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04192013_for_2013.pdf 840~Mechanically Stabilized Earth Wall~2013~12/31/2012~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_12312012_for_2013.PDF 840~Mechanically Stabilized Earth Wall~2016~7/20/2018~Archive~Supplemental Spec~See Designer Note in specification~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07202018_for_2016.pdf 840~Mechanically Stabilized Earth Wall~2016~10/20/2017~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_10202017_for_2016.pdf 840~Mechanically Stabilized Earth Wall~2016~7/21/2017~Archive~Supplemental Spec~See Specification~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07212017_for_2016.pdf 840~Mechanically Stabilized Earth Wall~2016~4/15/2016~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04152016_for_2016.pdf 840~Mechanically Stabilized Earth Wall~2016~7/17/2015~Archive~Supplemental Spec~This Supplemental Specification is to be included on all projects using MSE walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07172015_for_2016.PDF 840~Mechanically Stabilized Earth Wall~2019~4/16/2021~Archive~Supplemental Spec~This Supplemental Specification  is to be included on all projects using MSE Walls.  See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04162021_for_2019.pdf 840~Mechanically Stabilized Earth Wall~2019~1/15/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01152021_for_2019.pdf 840~Mechanically Stabilized Earth Wall~2019~1/17/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01172020_for_2019.pdf 840~Mechanically Stabilized Earth Wall~2019~1/18/2019~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01182019_for_2019.pdf 840~Mechanically Stabilized Earth Wall~2023~1/17/2025~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_01172025_for_2023.pdf 840~Mechanically Stabilized Earth Wall~2023~7/19/2024~Archive~Supplemental Spec~This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07192024_for_2023.pdf 840~Mechanically Stabilized Earth Wall~2023~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_07212023_for_2023.pdf 840~Mechanically Stabilized Earth Wall~2023~4/15/2022~Archive~Supplemental Spec~This Supplemental Specification  is to be included on all projects using MSE Walls.  See the Bridge Design Manual for technical design information.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/840_04152022_for_2023.pdf 841~Conduit Renewal Using Spiral Wound Liner~2010~4/16/2010~Archive~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification. Contact the Hydraulic Section of the Office of Structural Engineering if there are any questions or concerns with using this specifi~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_04162010 for 2010.pdf 841~Conduit Renewal Using Spiral Wound Liner~2013~7/17/2015~Archive~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown. Contact the Office of Hydraulic Engineering if there are any questions or concerns with using this specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_07172015_for_2013.pdf 841~Conduit Renewal Using Spiral Wound Liner~2013~4/18/2014~Archive~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in this specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_04182014_for_2013.pdf 841~Conduit Renewal Using Spiral Wound Liner~2013~4/15/2011~Archive~Supplemental Spec~This specification may be used for relining existing conduit for the sizes shown in the table shown in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/841_04152011_for_2013.PDF 842~Correcting Elevation Of Concrete Approach Slabs With High Density Polyurethane~2010~1/19/2007~Archive~Supplemental Spec~Estimate pounds to be used as follows: Volume of approach slab to be raised (height (feet) X plan area (square feet)) X 7#/CF x 120%. Include: Item 614 Maintenance of Traffic, Item 624 Mobilization ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/842_01192007_for_2010.PDF 843~Patching Concrete with Trowelable Mortar~2005~4/18/2003~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_04182003_for_2005.pdf 843~Patching Concrete with Trowelable Mortar~2008~4/18/2003~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_04182003_for_2008.PDF 843~Patching Concrete with Trowelable Mortar~2010~4/18/2003~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_04182003_for_2010.PDF 843~Patching Concrete with Trowelable Mortar~2013~4/18/2003~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_04182003_for_2013.PDF 843~Patching Concrete with Trowelable Mortar~2016~1/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_01152016_for_2016.pdf 843~Patching Concrete with Trowelable Mortar~2019~10/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_10182019_for_2019.pdf 843~Patching Concrete with Trowelable Mortar~2019~1/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_01152016_for_2019.pdf 843~Patching Concrete with Trowelable Mortar~2023~10/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/843_10182019_for_2023.pdf 844~Concrete Patching With Embedded Galvanic Anode Protection~2013~7/17/2015~Archive~Supplemental Spec~Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer. See note in document.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/844_07172015_for 2013.pdf 844~Concrete Patching With Embedded Galvanic Anode Protection~2016~7/17/2015~Archive~Supplemental Spec~Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer. See note in document.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/844_07172015_for_2016.PDF 844~Concrete Patching With Embedded Galvanic Anode Protection~2023~4/20/2018~Archive~Supplemental Spec~Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer.  See note in document.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/844_04202018_for_2023.pdf 845~Field Metallizing~2005~1/19/2007~Archive~Supplemental Spec~Include all pay items. 845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_01192007_for_2005.PDF 845~Field Metallizing~2008~1/19/2007~Archive~Supplemental Spec~Include all pay items. 845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_01192007_for_2008.PDF 845~Field Metallizing~2010~1/19/2007~Archive~Supplemental Spec~Include all pay items. 845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_01192007_for_2010.PDF 845~Field Metallizing~2013~1/19/2007~Archive~Supplemental Spec~Include all pay items. 845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_01192007_for_2013.PDF 845~Field Metallizing~2016~1/19/2007~Archive~Supplemental Spec~Include all pay items. 845.14 specifies metallizing to all structural steel; scuppers; expansion joints except for the traveled surface; steel railing; exposed steel piling; drain troughs; and other areas to the contract limits.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/845_01192007_for_2016.PDF 846~Polymer Modified Asphalt Expansion Joint System~2013~4/18/2014~Archive~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_04182014_for_2013.pdf 846~Polymer Modified Asphalt Expansion Joint System~2013~10/18/2013~Archive~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_10182013_for_2013.pdf 846~Polymer Modified Asphalt Expansion Joint System~2013~7/19/2013~Archive~Supplemental Spec~The plans shall show a plan view and cross-section of each polymer modified asphalt expansion joint location on the bridge.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/846_07192013_for_2013.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2005~4/15/2005~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_04152005_for_2005.PDF 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2008~4/16/2010~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_04162010 for 2008.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2008~10/16/2009~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_10162009_for_2008.PDF 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2008~4/15/2005~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_04152005_for_2008.PDF 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2010~10/21/2011~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 847 10212111(final).pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2010~4/15/2011~Archive~Supplemental Spec~See detailed notes in the specification. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Accepted SS 847 Rev. 04152111.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2010~1/21/2011~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Final SS 847 Rev. 012111.pdf 847~Bridge Deck Repair And Overlay With Concrete Using Scarification And Chipping~2010~7/16/2010~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_07162010 for 2010.PDF 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2010~4/16/2010~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_04162010 for 2010.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2010~1/15/2010~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_01152010_for_2010.PDF 847~Bridge Deck Repair And Overlay With Concrete Using Scarification And Chipping~2013~7/17/2015~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_ 07172015_for_2013.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2013~4/18/2014~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_04182014_for_2013.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2013~12/31/2012~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_12312012_for_2013.PDF 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2016~1/20/2017~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_01202017_for_2016.pdf 847~Bridge Deck Repair And Overlay With Concrete Using Scarification And Chipping~2016~7/15/2016~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_07152016_for_2016.pdf 847~Bridge Deck Repair And Overlay With Concrete Using Scarification And Chipping~2016~7/17/2015~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_07172015_for_2016.PDF 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2019~1/15/2021~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay.  If using LMC, must also list Supplemental S~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_01152021_for_2019.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2019~1/20/2017~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specif~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_01202017_for_2019.pdf 847~Bridge Deck Repair and Overlay with Concrete Using Scarification and Chipping~2023~1/15/2021~Archive~Supplemental Spec~This combines MSC and LMC overlays under the same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay.  If using LMC, must also list Supplemental S~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/847_01152021_for_2023.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2005~4/15/2005~Archive~Supplemental Spec~This combines MSC and LMC overlays under same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specificat~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_04152005_for_2005.PDF 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2008~4/16/2010~Archive~Supplemental Spec~See detailed notes in the specification. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_04162010 for 2008.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2008~10/16/2009~Archive~Supplemental Spec~This combines MSC and LMC overlays under same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specificat~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_10162009_for_2008.PDF 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2008~4/15/2005~Archive~Supplemental Spec~This combines MSC and LMC overlays under same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specificat~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_04152005_for_2008.PDF 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2010~10/21/2011~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 848 10212111(final).pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2010~4/15/2011~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Final SS 848 Rev. 04152111.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2010~1/21/2011~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Final SS 848 Rev. 012111.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2010~4/16/2010~Archive~Supplemental Spec~See detailed notes in the specification. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_04162010 for 2010.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2010~10/16/2009~Archive~Supplemental Spec~This combines MSC and LMC overlays under same Supplemental Specification - Must designate type of overlay and provide separate pay items for removal of existing Asphalt Overlay and/or Concrete Overlay. If using LMC, must also list Supplemental Specificat~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_10162009_for_2010.pdf 848~Bridge Deck Repair And Overlay With Concrete Using Hydro-Demolition~2013~7/17/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 07172015_for_2013.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydro-Demolition~2013~4/18/2014~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_04182014_for_2013.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydrodemolition~2013~12/31/2012~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_12312012_for_2013.PDF 848~Bridge Deck Repair and Overlay with Concrete Using Hydro-Demolition~2016~1/20/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 01202017_for_2016.pdf 848~Bridge Deck Repair And Overlay With Concrete Using Hydro-Demolition~2016~7/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 07152016_for_2016.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydro-Demolition~2016~7/17/2015~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_07172015_for_2016.PDF 848~Bridge Deck Repair and Overlay with Concrete Using Hydro-Demolition~2019~1/15/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 01152021_for_2019.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydro-Demolition~2019~1/20/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 01202017_for_2019.pdf 848~Bridge Deck Repair and Overlay with Concrete Using Hydro-Demolition~2023~1/15/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/848_ 01152021_for_2023.pdf 849~Heat Straightening of Damaged Structural Steel~2005~1/19/2007~Archive~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01192007_for_2005.PDF 849~Heat Straightening of Damaged Structural Steel~2008~1/19/2007~Archive~Supplemental Spec~Include all pay items. Designate the existing paint coating and application year. Designate the existing steel type, grade, minimum yield strength and allowable jacking stress which is 50% of the material yield stress. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01192007_for_2008.PDF 849~Heat Straightening of Damaged Structural Steel~2010~1/19/2007~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01192007_for_2010.PDF 849~Heat Straightening of Damaged Structural Steel~2013~1/19/2007~Archive~Supplemental Spec~See detailed notes in the specification.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/849_01192007_for_2013.PDF 850~Cement Treated Free Draining Base ~2008~4/18/2008~Archive~Supplemental Spec~Only use this supplemental specification after receiving approval by the Office of Pavement Engineering. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04182008_for_2008.PDF 850~Cement Treated Free Draining Base~2010~4/18/2008~Archive~Supplemental Spec~Only use this supplemental specification after receiving approval by the Office of Pavement Engineering. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04182008_for_2010.PDF 850~Cement Treated Free Draining Base~2013~4/18/2008~Archive~Supplemental Spec~Only use this supplemental specification after receiving approval by the Office of Pavement Engineering. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04182008_for_2013.PDF 850~Grooving For Recessed Pavement Markings~2019~4/15/2022~Archive~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet. Not intended for use with bridge deck epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04152022_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2019~1/21/2022~Archive~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet. Not intended for use with bridge deck epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_01212022_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2019~4/16/2021~Archive~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet. Not intended for use with bridge deck epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04162021_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2019~1/15/2021~Archive~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet. Not intended for use with bridge epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_01152021_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2019~7/17/2020~Archive~Supplemental Spec~This specification is to be used with wet reflective markings. Ensure supplemental specifications 807 and 905 are referenced on the plan cover sheet. Not intended for asphalt surfaces placed at less than 1” thickness.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_07172020_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2019~4/17/2020~Archive~Supplemental Spec~This specification is to be used with wet reflective markings. Ensure supplemental specifications 807 and 905 are referenced on the plan cover sheet. Not intended for asphalt surfaces placed at less than 1” thickness.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04172020_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2019~1/17/2020~Archive~Supplemental Spec~This specification is to be used with wet reflective markings. Ensure supplemental specifications 807 and 905 are referenced on the plan cover sheet. Not intended for asphalt surfaces placed at less than 1” thickness.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_01172020_for_2019.pdf 850~Grooving For Recessed Pavement Markings~2023~4/15/2022~Archive~Supplemental Spec~This specification is to be used with permanent wet reflective pavement markings. Ensure Supplemental Specification 807 is referenced on the plan cover sheet.   Not intended for use with bridge deck epoxy overlays.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/850_04152022_for_2023.pdf 851~Asphalt Treated Free Draining Base~2008~4/18/2008~Archive~Supplemental Spec~Only use this supplemental specification after receiving approval by the Office of Pavement Engineering. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_04182008_for_2008.PDF 851~Asphalt Treated Free Draining Base~2010~4/18/2008~Archive~Supplemental Spec~Only use this supplemental specification after receiving approval by the Office of Pavement Engineering. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_04182008_for_2010.PDF 851~Asphalt Treated Free Draining Base~2013~4/18/2008~Archive~Supplemental Spec~Only use this supplemental specification after receiving approval by the Office of Pavement Engineering. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_04182008_for_2013.PDF 851~Precast Gravity And Semigravity Retaining Wall~2019~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_01212022_for_2019.pdf 851~Precast Gravity And Semigravity Retaining Wall~2023~7/19/2024~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_07192024_for_2023.pdf 851~Precast Gravity And Semigravity Retaining Wall~2023~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/851_01212022_for_2023.pdf 855~Post-Tensioning~2016~4/21/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/855_04212017_for_2016.pdf 856~Bridge Deck Waterproofing Asphalt Surface Course~2013~4/18/2014~Archive~Supplemental Spec~1) Do not use waterproofing fabric or similar under this waterproofing overlay. 2) Ensure project completion date is prior to November 1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_04182014_for_2013.pdf 856~Hot Mix Asphalt Surface Course~2013~10/18/2013~Archive~Supplemental Spec~1) Do not use waterproofing fabric or similar under this waterproofing overlay. 2) Ensure project completion date is prior to November 1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_10182013_for_2013.pdf 856~Bridge Deck Waterproofing Asphalt Surface Course~2016~10/20/2017~Archive~Supplemental Spec~Do not use waterproofing fabric or similar under this waterproofing overlay. Remove all existing asphalt and waterproofing fabric prior to placement of sealant, tack and WHMA. Ensure project completion date is prior to November 1. The WHMA is not intende~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_10202017_for_2016.pdf 856~Bridge Deck Waterproofing Asphalt Surface Course~2016~4/18/2014~Archive~Supplemental Spec~1) Do not use waterproofing fabric or similar under this waterproofing overlay. 2) Ensure project completion date is prior to November 1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_04182014_for_2016.PDF 856~Bridge Deck Waterproofing Asphalt Surface Course~2019~10/20/2017~Archive~Supplemental Spec~Do not use waterproofing fabric or similar under this waterproofing overlay. Remove all existing asphalt and waterproofing fabric prior to placement of sealant, tack and WHMA. Ensure project completion date is prior to November 1. The WHMA is not intende~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_10202017_for_2019.pdf 856~Bridge Deck Waterproofing  Asphalt Surface Course~2023~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/856_01212022_for_2023.pdf 857~Asphalt Concrete with Gilsonite~2005~4/15/2005~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_04152005_for_2005.PDF 857~Asphalt Concrete with Gilsonite~2010~1/20/2012~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS857.REV0.2012.JAN.20 (final).pdf 857~Asphalt Concrete with Gilsonite~2010~4/18/2008~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_04182008_for_2010.PDF 857~Asphalt Concrete With Gilsontie~2013~12/31/2012~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_12312012_for_2013.PDF 857~Asphalt Concrete With Gilsonite~2016~7/18/2014~Archive~Supplemental Spec~This item is a highly rut-resistant mix intended for use in high stress areas. Use the 12.5mm mix if there are greater than 1500 trucks in the opening day traffic. Use 446 acceptance if the quantity is 250 tons or greater. Otherwise Use 448 acceptance.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_07182014_for_2016.PDF 857~Asphalt Concrete with Gilsonite~2019~1/18/2019~Archive~Supplemental Spec~This product can be selectively applied as an anti-rutting treatment according to the High Stress Guidelines Appendix B of the Pavement Design Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/857_01182019_for_2019.pdf 858~Thin Polymer (Epoxy) Overlays for Structural Slabs~2023~4/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/858_04202018_for_2023.pdf 859~Asphalt Concrete with Verglimit~2005~7/19/2002~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_07192002_for_2005.PDF 859~Asphalt Concrete with Verglimit~2008~1/15/2010~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01152010_for_2008.PDF 859~Asphalt Concrete with Verglimit~2008~4/17/2009~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_04172009_for_2008.PDF 859~Asphalt Concrete with Verglimit~2008~4/18/2008~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_04182008_for_2008.PDF 859~Asphalt Concrete with Verglimit~2010~1/15/2010~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01152010_for_2010.PDF 859~Asphalt Concrete with Verglimit~2013~7/18/2014~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_07182014_for_2013.pdf 859~Asphalt Concrete with Verglimit~2013~1/15/2010~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01152010_for_2013.PDF 859~Asphalt Concrete with Verglimit~2016~1/18/2019~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01182019_for_2016.pdf 859~Asphalt Concrete with Verglimit~2016~7/18/2014~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_07182014_for_2016.PDF 859~Asphalt Concrete with Verglimit~2019~1/18/2019~Archive~Supplemental Spec~This item is designed to assist with de-icing in certain temperature ranges and has usually been applied on bridge decks.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/859_01182019_for_2019.pdf 860~Thinlay Asphalt Conctete~2016~4/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/860_04202018_for_2016.pdf 860~Thinlay Asphalt Conctete~2019~4/20/2018~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/860_04202018_for_2019.pdf 861~Geogrid for Subgrade Stabilization~2008~7/17/2009~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_07172009 for 2008.pdf 861~Geogrid For Subgrade Stabilization~2008~4/17/2009~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_04172009_for_2008.PDF 861~Geogrid for Subgrade Stabilization~2010~4/19/2013~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_04192013_for_2010.pdf 861~Geogrid for Subgrade Stabilization~2010~7/15/2011~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_rev 2011-06-09.pdf 861~Geogrid for Subgrade Stabilization~2010~10/15/2010~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_2010-10-15.pdf 861~Geogrid For Subgrade Stabilization~2010~7/16/2010~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_07162010 for 2010.PDF 861~Geogrid for Subgrade Stabilization~2010~7/17/2009~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_07172009_for_2010.pdf 861~Geogrid for Subgrade Stabilization~2013~1/16/2015~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_01162015_for_2013.pdf 861~Geogrid for Subgrade Stabilization~2013~7/19/2013~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_07192013_for_2013.pdf 861~Geogrid for Subgrade Stabilization~2013~4/19/2013~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_04192013_for_2013.pdf 861~Geogrid for Subgrade Stabilization~2013~7/15/2011~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_07152011_for_2013.PDF 861~Geogrid for Subgrade Stabilization~2016~1/16/2015~Archive~Supplemental Spec~Use geogrid in the design according to Geotechnical Bulletin 1 (GB1). (See detailed notes in the specification.)~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/861_01162015_for_2016.PDF 862~Rockfall Protection~2008~4/17/2009~Archive~Supplemental Spec~Consult with the Office of Geotechnical Engineering when considering the use of Rockfall Protection.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_04172009_for_2008.PDF 862~Rockfall Protection~2010~4/17/2009~Archive~Supplemental Spec~Consult with the Office of Geotechnical Engineering when considering the use of Rockfall Protection.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_04172009_for_2010.PDF 862~Rockfall Protection~2013~12/31/2012~Archive~Supplemental Spec~Consult with the Office of Geotechnical Engineering when considering the use of Rockfall Protection.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_12312012_for_2013.PDF 862~Rockfall Protection~2023~10/16/2015~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/862_10162015_for_2023.PDF 863~Reinforced Soil Slopes~2010~10/19/2012~Archive~Supplemental Spec~See details in document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10192012_for_2010.pdf 863~Reinforced Soil Slopes~2013~10/17/2014~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10172014_for_2013.pdf 863~Reinforced Soil Slopes~2013~10/19/2012~Archive~Supplemental Spec~See details in document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10192012_for_2013.PDF 863~Reinforced Soil Slopes~2016~10/17/2014~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10172014_for_2016.PDF 863~REINFORCED SOIL SLOPES~2019~7/16/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_07162021_for_2019.pdf 863~Reinforced Soil Slopes~2019~10/17/2014~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10172014_for_2019.PDF 863~Reinforced Soil Slopes~2023~10/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/863_10212022_for_2023.pdf 866~Ground Anchors~2010~10/19/2012~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/866_10192012_for_2010.pdf 866~Ground Anchors~2013~10/19/2012~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/866_10192012_for_2013.PDF 866~Ground Anchors~2016~10/19/2012~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/866_10192012_for_2016.PDF 867~Temporary Wire Faced Mechanically Stabilized Earth Wall~2016~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/867_01182019_for_2016.pdf 867~Temporary Wire Faced Mechanically Stabilized Earth Wall~2016~4/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/867_04152016_for_2016.pdf 867~Temporary Wire Faced Mechanically Stabilized Earth Wall~2019~1/15/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/867_01152021_for_2019.pdf 867~Temporary Wire Faced Mechanically Stabilized Earth Wall~2019~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/867_01182019_for_2019.pdf 869~High Load Multi Rotational (HLMR) Bearings~2013~4/20/2012~Archive~Supplemental Spec~This specification is to be used on all projects that utilize high load multi-rotational bearing types (e.g. pot bearings or disc bearings)....see document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/869_04202012_for_2013.PDF 870~Prefabricated Modular Retaining Wall~2019~4/16/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_04162021_for_2019.pdf 870~Prefabricated Modular Retaining Wall~2019~1/15/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_01152021_for_2019.pdf 870~Prefabricated Modular Retaining Wall~2019~4/19/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_04192019_for_2019.pdf 870~Prefabricated Modular Retaining Wall~2023~1/17/2025~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_01172025_for_2023.pdf 870~Prefabricated Modular Retaining Wall~2023~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_07212023_for_2023.pdf 870~Prefabricated Modular Retaining Wall~2023~10/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/870_10212022_for_2023.pdf 872~Light Emitting Diode Traffic Signal Lamp Units~2005~4/21/2006~Archive~Supplemental Spec~Supplemental Specification will be provided on all projects where LED signal heads are specified for State maintained traffic signals. It may be provided on other projects at the maintaining agency's discretion ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_04212006_for_2005.PDF 872~Void Reducing Asphalt Membrane~2016~4/19/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_04192019_for_2016.pdf 872~Void Reducing Asphalt Membrane~2019~4/17/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_04172020_for_2019.pdf 872~Void Reducing Asphalt Membrane~2019~7/19/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_07192019_for_2019.pdf 872~Void Reducing Asphalt Membrane~2019~4/19/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_04192019_for_2019.pdf 872~Void Reducing Asphalt Membrane~2023~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/872_01212022_for_2023.pdf 873~Wet Reflective Removable Tape~2005~10/30/2003~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10302003_for_2005.pdf 873~Wet Reflective Removable Tape~2008~10/17/2008~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10172008 for 2008.pdf 873~Wet Reflective Removable Tape~2008~10/30/2003~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10302003_for_2008.PDF 873~Wet Reflective Removable Tape~2010~10/17/2008~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10172008_for_2010.pdf 873~Wet Reflective Removable Tape~2013~10/17/2008~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10172008_for_2013.PDF 873~Wet Reflective Removable Tape~2016~10/17/2008~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10172008_for_2016.PDF 873~Wet Reflective Removable Tape~2019~10/17/2008~Archive~Supplemental Spec~This supplemental specification 873 will be provided on all projects where Wet Reflective Removable Tape is specified~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/873_10172008_for_2019.PDF 874~Ultra Thin Bonded Asphalt Overlay~2005~4/20/2007~Archive~Supplemental Spec~In general, following the guidance of the Preventive Maintenance policy for application will suffice. Do not crack seal within 1 year prior to constructing this item. No special maintenance of traffic considerations~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_04202007_for_2005.PDF 874~Ultra Thin Bonded Asphalt Overlay~2008~4/18/2008~Archive~Supplemental Spec~In general, following the guidance of the Preventive Maintenance policy for application will suffice. Do not crack seal within 1 year prior to constructing this item. No special maintenance of traffic considerations~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_04182008_for_2008.PDF 874~Ultra thin Bonded Asphalt Concrete~2010~4/18/2008~Archive~Supplemental Spec~In general, following the guidance of the Preventive Maintenance policy for application will suffice. Do not crack seal within 1 year prior to constructing this item.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_04182008_for_2010.PDF 874~Ultra thin Bonded Asphalt Concrete~2013~4/18/2008~Archive~Supplemental Spec~In general, following the guidance of the Preventive Maintenance policy for application will suffice. Do not crack seal within 1 year prior to constructing this item.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_04182008_for_2013.PDF 874~Longitudinal Joint Preparation~2019~10/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/874_10182019_for_2019.pdf 875~Hot Applied Asphaltic Joint Adhesive Material and Construction Requirements~2016~1/17/2014~Archive~Supplemental Spec~Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/875_01172014_for_2016.PDF 875~Longitudinal Joint Adhesive~2023~1/18/2019~Archive~Supplemental Spec~Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/875_01182019_for_2023.pdf 878~Inspection and Compaction Testing of Unbound Materials~2005~4/18/2008~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work. Contact the DCE before incorporating this note into the plans. SS 878 and 879 are very similar specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04182008_for_2005.PDF 878~Inspection and Compaction Testing of Unbound Materials~2005~4/21/2006~Archive~Supplemental Spec~Contact the District Construction Engineer before incorporating this note into the plans. SS 878 and 879 are very similar specifications. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04212006_for_2005.PDF 878~Inspection and Compaction Testing of Unbound Materials~2008~4/18/2008~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work. Contact the District Construction Engineer before incorporating this note into the plans. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04182008_for_2008.PDF 878~Inspection and Compaction Testing of Unbound Materials~2010~4/18/2008~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work. Contact the District Construction Engineer before incorporating this note into the plans. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04182008_for_2010.PDF 878~Inspection and Compaction Testing of Unbound Materials~2013~4/19/2013~Archive~Supplemental Spec~Contact the District Construction Administrator before incorporating this note into the plans. SS 878 and 879 are very similar specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04192013_for_2013.pdf 878~Inspection and Compaction Testing of Unbound Materials~2013~12/31/2012~Archive~Supplemental Spec~Contact the District Construction Administrator before incorporating this note into the plans. SS 878 and 879 are very similar specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_12312012_for_2013.PDF 878~Inspection and Compaction Testing of Unbound Materials~2016~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01182019_for_2016.pdf 878~Inspection and Compaction Testing of Unbound Materials~2016~1/20/2017~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01202017_for_2016.pdf 878~Inspection and Compaction Testing of Unbound Materials~2016~7/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_07152016_for_2016.pdf 878~Inspection and Compaction Testing of Unbound Materials~2016~10/18/2013~Archive~Supplemental Spec~Contact the District Construction Administrator before incorporating this note into the plans. SS 878 and 879 are very similar specifications.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_10182013_for_2016.PDF 878~Inspection And Compaction Testing Of Unbound Materials~2019~4/16/2021~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_04162021_for_2019.pdf 878~Inspection and Compaction Testing of Unbound Materials~2019~1/17/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01172020_for_2019.pdf 878~Inspection and Compaction Testing of Unbound Materials~2019~1/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01182019_for_2019.pdf 878~Inspection And Compaction Testing Of Unbound Materials~2023~1/21/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/878_01212022_for_2023.pdf 879~QC/QA Embankment~2005~4/21/2006~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work. For estimating purposes use the maximum incentive. Contact the DCE before incorporating this note into the plans. ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_04212006_for_2005.PDF 879~QC/QA Embankment~2008~4/21/2006~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work. For estimating purposes use the maximum incentive. Contact the District Construction Engineer before incorporating this ~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_04212006_for_2008.PDF 879~QC/QA Embankment~2010~4/19/2013~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_04192013_for_2010.pdf 879~QC/QA Embankment~2010~4/21/2006~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_04212006_for_2010.PDF 879~QC/QA Embankment~2013~4/19/2013~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_04192013_for_2013.pdf 879~QC/QA Embankment~2013~12/31/2012~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_12312012_for_2013.PDF 879~QC/QA Embankment~2016~7/15/2016~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_07152016_for_2016.pdf 879~QC/QA Embankment~2016~4/19/2013~Archive~Supplemental Spec~Use this note when construction personnel are limited and the District wants full time inspection and compaction testing for the work.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/879_04192013_for_2016.PDF 880~Asphalt Concrete with Warranty~2005~7/21/2006~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_04152005_for_2005.PDF 880~Asphalt Concrete with Warranty~2005~7/21/2006~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_07212006_for_2005.PDF 880~Asphalt Concrete with Warranty~2008~7/18/2008~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_07182008 for 2008.pdf 880~Asphalt Concrete with Warranty~2008~4/18/2008~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_04182008_for_2008.PDF 880~Asphalt Concrete with Warranty~2010~7/18/2008~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_07182008_for_2010.pdf 880~Asphalt Concrete with Warranty~2013~12/31/2012~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_12312012_for_2013.PDF 880~Asphalt Concrete with Warranty~2016~12/31/2012~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_12312012_for_2016.PDF 880~Asphalt Concrete with Warranty~2019~12/31/2012~Archive~Supplemental Spec~Use this Warranty Supplemental Specification in accordance with the guidelines in the Innovative Contracting Manual.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/880_12312012_for_2019.PDF 881~Micro-Surfacing with Warranty~2005~4/15/2005~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_04152005_for_2005.PDF 881~Microsurfacing With Warranty~2008~4/18/2008~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_04182008_for_2008.PDF 881~Microsurfacing With Warranty~2010~10/15/2010~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 881_10152010.pdf 881~Microsurfacing With Warranty~2010~4/18/2008~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_04182008_for_2010.PDF 881~Microsurfacing With Warranty~2013~12/31/2012~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_12312012_for_2013.PDF 881~Microsurfacing With Warranty~2016~12/31/2012~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_12312012_for_2016.PDF 881~Microsurfacing With Warranty~2019~12/31/2012~Archive~Supplemental Spec~The plans may combine multiple course microsurfacing with warranty on the driving lanes with single course microsurfacing with warranty on the shoulders.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/881_12312012_for_2019.PDF 882~Chip Seal with Warranty~2005~4/15/2005~Archive~Supplemental Spec~This note is for all Chip Seal projects where a warranty is desired and there are no special aggregate size requirements. There are no pay item changes except for a double chip seal RPM’s must be replaced.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_04152005_for_2005.PDF 882~Chip Seal With Warranty~2008~1/16/2009~Archive~Supplemental Spec~This note is for all Chip Seal projects where a warranty is desired and there are no special aggregate size requirements. There are no pay item changes except for a double chip seal RPM’s must be replaced.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_01162009_for_2008.PDF 882~Chip Seal With Warranty~2008~4/18/2008~Archive~Supplemental Spec~This note is for all Chip Seal projects where a warranty is desired and there are no special aggregate size requirements. There are no pay item changes except for a double chip seal RPM’s must be replaced.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_04182008_for_2008.PDF 882~Chip Seal With Warranty~2010~1/20/2012~Archive~Supplemental Spec~This note is for all chip seal projects where a warranty is desired and there are no special aggregate size requirements.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS882.REV1.2012.JAN.20 (final).pdf 882~Chip Seal With Warranty~2010~4/15/2011~Archive~Supplemental Spec~This note is for all Chip Seal projects where a warranty is desired and there are no special aggregate size requirements. There are no pay item changes except for a double chip seal RPM’s must be replaced.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882.ChipSealwithWarranty.2011.APR.15.REV1.for posting(final).pdf 882~Chip Seal With Warranty~2010~7/16/2010~Archive~Supplemental Spec~This note is for all Chip Seal projects where a warranty is desired and there are no special aggregate size requirements. There are no pay item changes except for a double chip seal RPM’s must be replaced.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_07162010 for 2010.PDF 882~Chip Seal With Warranty~2010~1/16/2009~Archive~Supplemental Spec~This note is for all Chip Seal projects where a warranty is desired and there are no special aggregate size requirements. There are no pay item changes except for a double chip seal RPM’s must be replaced.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_01162009_for_2010.PDF 882~Chip Seal With Warranty~2013~7/19/2013~Archive~Supplemental Spec~This note is for all chip seal projects where a warranty is desired and there are no special aggregate size requirements.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_07192013_for_2013.pdf 882~Chip Seal With Warranty~2013~12/31/2012~Archive~Supplemental Spec~This note is for all chip seal projects where a warranty is desired and there are no special aggregate size requirements.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_12312012_for_2013.PDF 882~Chip Seal With Warranty~2016~7/19/2013~Archive~Supplemental Spec~This note is for all chip seal projects where a warranty is desired and there are no special aggregate size requirements.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_07192013_for_2016.PDF 882~Chip Seal With Warranty~2019~7/19/2013~Archive~Supplemental Spec~This note is for all chip seal projects where a warranty is desired and there are no special aggregate size requirements.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/882_07192013_for_2019.PDF 884~Concrete Pavement With Warranty~2016~12/31/2012~Archive~Supplemental Spec~Must also list Supplemental Specification 812~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/884_12312012_for_2016.PDF 885~Painting of Structural Steel with Warranty~2005~11/4/2005~Archive~Supplemental Spec~"Use this specification on all projects that have a Primary Work Category entitled ""Bridge Painting"". Contact the District for designation of the project Primary Work Category. Contact Central Office, Office of Construction Administration."~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/885_11042005_for_2005.PDF 886~Hot In-Place Recycling with Warranty~2005~4/20/2007~Archive~Supplemental Spec~Defined hot in-place recycling; no pay item changes.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_04202007_for_2005.PDF 886~Hot In-Place Recycling with Warranty~2005~4/18/2003~Archive~Supplemental Spec~Defined hot in-place recycling; no pay item changes.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_04182003_for_2005.pdf 886~Hot In-Place Recycling with Warranty~2008~4/18/2008~Archive~Supplemental Spec~Defined hot in-place recycling; no pay item changes~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_04182008_for_2008.PDF 886~Hot In-Place Recycling with Warranty~2010~4/18/2008~Archive~Supplemental Spec~Defined hot in-place recycling; no pay item changes~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_04182008_for_2010.PDF 886~Hot In-Place Recycling with Warranty~2013~12/31/2012~Archive~Supplemental Spec~Defined hot in-place recycling; no pay item changes~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/886_12312012_for_2013.PDF 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2010~1/18/2013~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01182013_for_2010.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2013~1/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01162015_for_2013.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2013~4/18/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_04182014_for_2013.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2013~1/17/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01172014_for_2013.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2013~1/18/2013~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01182013_for_2013.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2016~4/21/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_04212017_for_2016.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2016~10/21/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_10212016_for_2016.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2016~1/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_01152016_for_2016.pdf 887~Ground Tire Rubber Modified Asphalt Binder Materials and Construction Requirements~2019~4/21/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/887_04212017_for_2019.pdf 888~Portland Cement Concrete Pavement Using Qc/Qa~2008~4/18/2008~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Office of Pavement Engineering at 614-995-5993~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_04182008_for_2008.PDF 888~Portland Cement Concrete Pavement Using QC/QA~2010~4/15/2011~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Office of Pavement Engineering at 614-995-5993~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 888 Portland Cement Concrete Pavement using QC-QA.pdf 888~Portland Cement Concrete Pavement Using QC/QA~2010~1/21/2011~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Office of Pavement Engineering at 614-995-5993~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS888.QA-QC Concrete.SS800.2011.JAN.21.pdf 888~Portland Cement Concrete Pavement Using Qc/Qa~2010~4/18/2008~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Office of Pavement Engineering at 614-995-5993~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_04182008_for_2010.PDF 888~High Friction Surface Treatment~2023~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_07212023_for_2023.pdf 888~High Friction Surface Treatment~2023~10/18/2019~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/888_10182019_for_2023.pdf 893~Class S Concrete for New Bridge Decks with Warranty~2005~4/15/2005~Archive~Supplemental Spec~Must also list Supplemental Specification 848 and 846.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/893_04152005_for_2005.PDF 893~Class S Concrete for New Bridge Decks with Warranty~2008~4/15/2005~Archive~Supplemental Spec~Must also list Supplemental Specification 848 and 846.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/893_04152005_for_2008.PDF 893~Class S Concrete for New Bridge Decks with Warranty~2010~4/15/2005~Archive~Supplemental Spec~Must also list Supplemental Specification 848 and 846.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/893_04152005_for_2010.PDF 893~CONTINUOUS FLIGHT AUGER PILES~2019~10/16/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/893_10162020_for_2019.pdf 894~High Performance Concrete for New Bridge Decks with Warranty~2005~4/15/2005~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/894_04152005_for_2005.PDF 894~High Performance Concrete for New Bridge Decks with Warranty~2008~4/15/2005~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/894_04152005_for_2008.PDF 894~High Performance Concrete for New Bridge Decks with Warranty~2010~4/15/2005~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/894_04152005_for_2010.PDF 894~Testing Foundations With Thermal Integrity Profiling (TIP)~2019~10/16/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/894_10162020_for_2019.pdf 895~Manufactured Water Quality Structure~2005~4/21/2006~Archive~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04212006_for_2005.PDF 895~Manufactured Water Quality Structure~2005~4/16/2004~Archive~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04162004_for_2005.PDF 895~Manufactured Water Quality Structure~2008~4/18/2008~Archive~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04182008_for_2008.PDF 895~Manufactured Water Quality Structure~2010~4/17/2009~Archive~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_04172009_for_2010.PDF 895~Manufactured Water Quality Structure~2013~12/31/2012~Archive~Supplemental Spec~The Designer must reference Standard Construction Drawing MH-1.2 and SS 995. Contact the Office of Structural Engineering, Hydraulics Section for design criteria or other information required to design the manufactured water quality structure~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/895_12312013_for_2013.PDF 896~QC/QA Concrete Pavement with Warranty~2005~4/15/2005~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Questions about the use of this note should be directed to: Aric Morse 614-995-5994 Roger Green 614-995-5993 Dave Miller 614-995-5991~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_04152005_for_2005.PDF 896~QC/QA Concrete Pavement with Warranty~2008~4/18/2008~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_04182008_for_2008.PDF 896~QC/QA Concrete Pavement with Warranty~2010~4/18/2008~Archive~Supplemental Spec~This specification is intended for large-scale paving projects, approximately 50,000 square yards and greater. Contact the Office of Pavement Engineering (614) 995-5990 for further information and use.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_04182008_for_2010.PDF 896~Work Zone Queue Detection Warning System~2016~7/15/2016~Archive~Supplemental Spec~Use only in accordance with the Traffic Engineering Manual (TEM) Part 6, Section 640-29.1.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/896_07152016_for_2016.pdf 898~QC/QA Concrete for Structures~2005~4/18/2008~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_04182008_for_2005.PDF 898~QC/QA Concrete for Structures~2005~7/21/2006~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_07212006_for_2005.PDF 898~QC/QA Concrete for Structures~2005~7/16/2004~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_07162004_for_2005.pdf 898~QC/QA Concrete for Structures~2008~7/17/2009~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_07172009_for_2008.pdf 898~QC/QA Concrete For Structures~2008~4/17/2009~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_04172009_for_2008.PDF 898~QC/QA Concrete for Structures ~2008~4/18/2008~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_04182008_for_2008.PDF 898~QC/QA Concrete for Structures~2010~10/21/2011~Archive~Supplemental Spec~Specify the required strength and permeably in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 898 10-21-2111(final).pdf 898~QC/QA Concrete for Structures~2010~7/15/2011~Archive~Supplemental Spec~Specify the required strength and permeably in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Proposed Changes to SS 898 7-15-2111.pdf 898~QC/QA Concrete for Structures~2010~1/21/2011~Archive~Supplemental Spec~Specify the required strength and permeably in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/Final SS 898 Rev. 012111.pdf 898~QC/QA Concrete for Structures~2010~10/15/2010~Archive~Supplemental Spec~Specify the required strength and permeably in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 898 10152010.pdf 898~QC/QA Concrete for Structures~2010~7/17/2009~Archive~Supplemental Spec~Specify the required strength and permeabily in the plans and proposal item description. Do not use where warranty specifications are required.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/898_07172009_for_2010.pdf 899~Cured-In-Place Pipe Liner~2019~1/17/2020~Archive~Supplemental Spec~Perform a hydraulic analysis showing the lined pipe provides a flow capacity equal to, or greater than, that of the host pipe prior to rehabilitation. Consider another rehabilitation method when voids exist in the host pipe backfill.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/899_01172020_for_2019.pdf 899~Close-Fit Pipe Liner~2023~1/17/2025~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/899_01172025_for_2023.pdf 899~Close-Fit Pipe Liner~2023~1/19/2024~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/899_01192024_for_2023.pdf 899~Cured-In-Place Pipe Liner~2023~1/20/2023~Archive~Supplemental Spec~Perform a hydraulic analysis showing the lined pipe provides a flow capacity equal to, or greater than, that of the host pipe prior to rehabilitation. Consider another rehabilitation method when voids exist in the host pipe backfill.~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/899_01202023_for_2023.pdf 902~Conduit Inspection Equipment~2008~10/20/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_10202008 for 2008.pdf 902~Conduit Inspection Equipment~2010~7/16/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_07162010 for 2010.PDF 902~Conduit Inspection Equipment~2010~10/20/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_10202008_for_2010.pdf 902~Conduit Inspection Equipment~2019~12/31/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_12312012_for_2019.PDF 902~Conduit Inspection Equipment~2023~7/19/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/902_07192019_for_2023.pdf 903~GPS (Global Positioning System) Clock Assembly~2010~7/16/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/903_07162010 for 2010.PDF 904~Fiber Optic Cable For Traffic Signal Interconnect~2005~1/19/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01192007_for_2005.PDF 904~Fiber Optic Cable For Traffic Signal Interconnect~2008~1/19/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01192007_for_2008.PDF 904~Fiber Optic Cable For Traffic Signal Interconnect~2010~7/19/2013~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07192013_for_2010.pdf 904~Fiber Optic Cable For Traffic Signal Interconnect~2010~1/19/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01192007_for_2010.PDF 904~Fiber Optic Cable And Components~2013~1/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01152016_for_2013.pdf 904~Fiber Optic Cable And Components~2013~1/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01162015_for_2013.pdf 904~Fiber Optic Cable and Components~2013~4/18/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_04182014_for_2013.pdf 904~Fiber Optic Cable For Traffic Signal Interconnect~2013~7/19/2013~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07192013_for_2013.pdf 904~Fiber Optic Cable For Traffic Signal Interconnect~2013~1/19/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01192007_for_2013.PDF 904~Fiber Optic Cable And Components~2016~1/18/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01182019_for_2016.pdf 904~Fiber Optic Cable And Components~2016~10/19/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_10192018_for_2016.pdf 904~Fiber Optic Cable And Components~2016~7/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07152016_for_2016.pdf 904~Fiber Optic Cable And Components~2016~1/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01152016_for_2016.pdf 904~Fiber Optic Cable And Components~2019~4/15/2022~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_04152022_for_2019.pdf 904~FIBER OPTIC CABLE AND COMPONENTS~2019~10/15/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_10152021_for_2019.pdf 904~Fiber Optic Cable And Components~2019~1/15/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01152021_for_2019.pdf 904~Fiber Optic Cable For Traffic Signal Interconnect~2019~7/17/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07172020_for_2019.pdf 904~Fiber Optic Cable And Components~2019~7/19/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_07192019_for_2019.pdf 904~Fiber Optic Cable And Components~2019~1/18/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/904_01182019_for_2019.pdf 905~Wet Reflective Optics Materials~2019~1/17/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/905_01172020_for_2019.pdf 905~Wet Reflective Optics Materials~2023~4/17/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/905_04172020_for_2023.pdf 906~Spread Spectrum Radio~2008~1/19/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_01192007_for_2008.PDF 906~Spread Spectrum Radio~2010~10/17/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/906_10172008_for_2010.pdf 907~Video Detection System~2008~1/19/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01192007_for_2008.PDF 907~Video Detection System~2010~1/15/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01152010_for_2010.PDF 907~Video Detection System~2019~1/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/907_01202012_for_2019.PDF 908~Digital Speed Limit (DSL) Sign Assembly~2013~10/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_10162015_for_2013.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2013~7/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_07172015_for_2013.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2013~1/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_01162015_for_2013.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2016~1/29/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_01292016_for_2016.pdf 908~Digital Speed Limit (DSL) Sign Assembly~2016~10/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_10162015_for_2016.PDF 908~Digital Speed Limit (DSL) Sign Assembly~2023~10/20/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/908_10202017_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices and Components~2019~10/21/2022~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_10212022_for_2019.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2019~7/15/2022~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07152022_for_2019.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2019~4/15/2022~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_04152022_for_2019.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2019~1/21/2022~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_01212022_for_2019.pdf 909~Intelligent Transportation System  Devices and Components~2019~10/15/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_10152021_for_2019.pdf 909~Intelligent Transportation System  Devices and Components~2019~7/16/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07162021_for_2019.pdf 909~Intelligent Transportation System  Devices and Components~2019~4/16/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_04162021_for_2019.pdf 909~Intelligent Transportation System  Devices and Components~2019~1/15/2021~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_01152021_for_2019.pdf 909~Intelligent Transportation System  Devices and Components~2019~10/16/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_10162020_for_2019.pdf 909~Intelligent Transportation System Devices and Components~2019~7/17/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07172020_for_2019.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2023~7/18/2025~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07182025_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2023~1/17/2025~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_01172025_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2023~7/19/2024~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07192024_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2023~1/19/2024~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_01192024_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2023~10/20/2023~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_10202023_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices And Components~2023~7/21/2023~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_07212023_for_2023.pdf 909~Intelligent Transportation System (ITS) Devices and Components~2023~10/21/2022~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/909_10212022_for_2023.pdf 910~Vital Inductive Loop Processor~2013~4/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/910_04172015_for_2013.pdf 910~Vital Inductive Loop Processor~2016~4/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/910_04172015_for_2016.PDF 913~Luminaire, Solid-State (LED)~2013~10/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_10162015_for_2013.pdf 913~Luminaire, Solid-State (LED)~2013~1/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_01162015_for_2013.pdf 913~Luminaire, Solid-State (LED)~2013~7/18/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_07182014_for_2013.pdf 913~Luminaire, Solid-State (LED)~2016~4/21/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_04212017_for_2016.pdf 913~Luminaire, Solid-State (LED)~2016~1/20/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_01202017_for_2016.pdf 913~Luminaire, Solid-State (LED)~2016~10/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_10162015_for_2016.PDF 913~Luminaire, Solid-State (LED)~2019~4/21/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/913_04212017_for_2019.pdf 914~Heat-Fused Preformed Thermoplastic Shield Pavement Marking Material~2016~4/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/914_04152016_for_2016.pdf 916~Coating Of Light Supports, Signal Supports, And Other Similar Items Over Hot-Dip Galvanized Steel Or Aluminum~2013~4/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_04152016_for_2013.pdf 916~Coating Of Light Supports, Signal Supports, And Other Similar Items Over Hot-Dip Galvanized Steel Or Aluminum~2016~1/19/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_01192018_for_2016.pdf 916~Coating Of Light Supports, Signal Supports, And Other Similar Items Over Hot-Dip Galvanized Steel Or Aluminum~2016~4/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_04152016_for_2016.pdf 916~Coating Of Light Supports And Signal Supports Over Hot-Dip Galvanized Steel Or Aluminum~2019~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_07212023_for_2019.pdf 916~Coating Of Light Supports And Signal Supports Over Hot-Dip Galvanized Steel Or Aluminum~2019~7/15/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_07152022_for_2019.pdf 916~COATING OF LIGHT SUPPORTS AND SIGNAL SUPPORTS OVER HOT-DIP GALVANIZED STEEL OR ALUMINUM~2019~10/16/2020~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_10162020_for_2019.pdf 916~Coating Of Light Supports, Signal Supports, And Other Similar Items Over Hot-Dip Galvanized Steel Or Aluminum~2019~1/19/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_01192018_for_2019.pdf 916~Coating Of Light Supports And Signal Supports Over Hot-Dip Galvanized Steel Or Aluminum~2023~7/21/2023~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_07212023_for_2023.pdf 916~Coating Of Light Supports And Signal Supports Over Hot-Dip Galvanized Steel Or Aluminum~2023~7/15/2022~Archive~Supplemental Spec~See Document~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/916_07152022_for_2023.pdf 917~Spray Thermoplastic Pavement Marking~2010~7/16/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/917_07162010 for 2010.PDF 919~Railroad Preemption Interface~2013~1/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01152016_for_2013.pdf 919~Railroad Preemption Interface~2013~1/17/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01172014_for_2013.pdf 919~Railroad Preemption Interface~2016~1/20/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01202017_for_2016.pdf 919~Railroad Preemption Interface~2016~1/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01152016_for_2016.pdf 919~Railroad Preemption Interface~2019~1/20/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/919_01202017_for_2019.pdf 921~Arrow Board~2010~4/20/2012~Archive~Supplemental Spec~~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/SS 921_04202012.pdf 921~Arrow Board~2013~4/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/921_04202012_for_2013.PDF 921~Arrow Board~2016~4/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/921_04202012_for_2016.PDF 921~Arrow Board~2019~4/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/921_04202012_for_2019.PDF 921~Arrow Board~2023~4/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/921_04202012_for_2023.PDF 929~Work Zone Egress Warning System Materials~2019~1/20/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/929_01202017_for_2019.pdf 929~Work Zone Egress Warning System Materials~2023~1/20/2017~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/929_01202017_for_2023.pdf 930~Automated Flagger Assistance Device~2013~4/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/930_04202012_for_2013.PDF 930~Automated Flagger Assistance Device~2019~1/17/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/930_01172014_for_2019.PDF 931~Longitudinal Channelizing Device Materials~2016~10/21/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/931_10212016_for_2016.pdf 931~Longitudinal Channelizing Device Materials~2019~1/17/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/931_01172020_for_2019.pdf 931~Longitudinal Channelizing Device Materials~2019~10/21/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/931_10212016_for_2019.pdf 931~Longitudinal Channelizing Device Materials~2023~1/17/2020~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/931_01172020_for_2023.pdf 936~Geosynthetic Cementitious Composite Mat~2016~7/20/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/936_07202018_for_2016.pdf 936~Geosynthetic Cementitious Composite Mat~2016~1/19/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/936_01192018_for_2016.pdf 936~Geosynthetic Cementitious Composite Mat~2019~7/20/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/936_07202018_for_2019.pdf 937~Polyethylene Liner Pipe~2005~4/20/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_10202006_for_2005.PDF 937~Polyethylene Liner Pipe~2008~4/20/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_04202007_for_2008.PDF 937~Polyethylene Liner Pipe~2010~4/20/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_04202007_for_2010.PDF 937~Polyethylene Liner Pipe~2013~7/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_07172015_for_2013.pdf 937~Polyethylene Liner Pipe~2013~4/20/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_04202007_for_2013.PDF 937~Polyethylene Liner Pipe~2016~10/16/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/937_10162015_for_2016.PDF 938~Steel Reinforced Thermoplastic Ribbed Pipe~2010~4/16/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/938_04162010 for 2010.pdf 938~Steel Reinforced Thermoplastic Ribbed Pipe~2013~4/16/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/938_04162010_for_2013.PDF 938~Steel Reinforced Thermoplastic Ribbed Pipe~2016~1/19/2018~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/938_01192018_for_2016.pdf 938~Steel Reinforced Thermoplastic Ribbed Pipe~2016~4/16/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/938_04162010_for_2016.PDF 939~Precast Trench Drain~2005~4/18/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_04182008_for_2005.PDF 939~Precast Trench Drain~2005~4/20/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_04202007_for_2005.PDF 939~Precast Trench Drain~2008~4/18/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_04182008_for_2008.PDF 939~Precast Trench Drain~2010~4/18/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_04182008_for_2010.PDF 939~Precast and Cast-in-Place Trench Drain~2013~7/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_07172015_for_2013.pdf 939~Precast Trench Drain~2013~4/18/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_04182008_for_2013.PDF 939~Precast and Cast-in-Place Trench Drain~2016~7/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_07172015_for_2016.PDF 939~Precast and Cast-in-Place Trench Drain~2019~7/17/2015~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/939_07172015_for_2019.PDF 940~14 FT to 20 FT Precast Reinforced Concrete Box Culverts~2013~4/19/2013~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/940_04192013_for_2013.pdf 961~Portable Traffic Signals~2005~10/30/2003~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10302003_for_2005.pdf 961~Portable Traffic Signals~2008~10/17/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10172008 for 2008.pdf 961~Portable Traffic Signals~2008~10/30/2003~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10302003_for_2008.pdf 961~Portable Traffic Signals~2010~10/17/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10172008_for_2010.pdf 961~Portable Traffic Signals~2013~10/17/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10172014_for_2013.pdf 961~Portable Traffic Signals~2013~10/17/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10172008_for_2013.PDF 961~Portable Traffic Signals~2016~1/18/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_01182019_for_2016.pdf 961~Portable Traffic Signals~2016~7/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_07152016_for_2016.pdf 961~Portable Traffic Signals~2016~10/17/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10172014_for_2016.PDF 961~Portable Traffic Signals~2019~10/18/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_10182019_for_2019.pdf 961~Portable Traffic Signals~2019~1/18/2019~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/961_01182019_for_2019.pdf 977~Dynamic Message Sign (DMS)~2008~4/17/2009~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_04172009_for_2008.PDF 977~Dynamic Message Sign (DMS)~2008~10/17/2008~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_10172008 for 2008.pdf 977~Dynamic Message Sign (DMS)~2010~4/17/2009~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_04172009_for_2010.PDF 977~Dynamic Message Sign (DMS)~2013~4/17/2009~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_04172009_for_2013.PDF 977~Dynamic Message Sign (DMS)~2016~4/17/2009~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_04172009_for_2016.PDF 977~Dynamic Message Sign (DMS)~2019~4/17/2009~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_04172009_for_2019.PDF 977~Dynamic Message Sign (DMS)~2023~4/17/2009~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/977_04172009_for_2023.PDF 992~Extrusheet Sign Aluminum Mounting Clip~2013~1/17/2014~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/992_01172014_for_2013.pdf 995~Precast Water Quality Structure~2005~4/25/2006~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_04252006_for_2005.PDF 995~Precast Water Quality Structure~2005~4/21/2006~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_04212006_for_2005.PDF 995~Precast Water Quality Structure~2008~4/20/2007~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_04202007_for_2008.PDF 995~Precast Water Quality Structure~2010~10/15/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_2010-10-15.pdf 995~Precast Water Quality Structure~2010~1/15/2010~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_01152010_for_2010.PDF 995~Precast Water Quality Structure~2013~1/20/2012~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/995_01202012_for_2013.PDF 996~Work Zone Queue Detection Warning System Materials~2019~7/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/996_07152016_for_2019.pdf 996~Work Zone Queue Detection Warning System Materials~2023~7/15/2016~Archive~Supplemental Spec~None~https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification Files/996_07152016_for_2023.pdf