D101
ITEM 611 - CATCH BASIN GRATE^^

MODIFY EXISTING CATCH BASINS BY REPLACING THE EXISTING 
GRATES WITH BICYCLE SAFE GRATES. QUANTITIES AND
LOCATIONS ARE SHOWN IN THE PLANS AND ARE PAID FOR
AT THE CONTRACT PRICE FOR ITEM 611, EACH, CATCH BASIN
GRATE, TYPE ____ EACH.~~

Designer Note:
use the above note on projects where existing catch basin grates are not bicycle
safe. The size and type of grate to be supplied must be indicated. There may be more than
one type and size on a project.

If specific locations are not shown in the plan, or additional grates are to be included on
a contingency basis, the following should either replace the second sentence in the note or
be added to the note:

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN INCLUDED
IN THE GENERAL SUMMARY FOR USE AS DIRECTED BY THE
ENGINEER FOR REPLACEMENT OF EXISTING CATCH BASIN GRATES
WITH BICYCLE SAFE GRATES:

611, CATCH BASIN GRATE, TYPE ____,   ____ EACH~~


D102
ITEM 611 - CONDUIT MISC.: INTERNAL JOINT SEAL^^

PROVIDE AN INTERNAL JOINT SEAL AT THE LOCATIONS INDICATED
IN THE PLANS. COMPRESS THE INTERNAL JOINT SEAL AGAINST THE
INTERNAL DIAMETER OF THE PIPE COVERING THE JOINT. EXTEND 
THE INTERNAL JOINT SEAL A MINIMUM OF 4 INCHES FROM EITHER 
SIDE OF THE JOINT. FURNISH AN INTERNAL JOINT SEAL COMPOSED 
OF EITHER MECHANICAL EXPANSION BANDS WITH LOCKING ASSEMBLY, 
A FIBERGLASS BASED RESIN POINT REPAIR, OR AN APPROVED EQUAL. 
PERFORM THE REPAIRS ON THE FOLLOWING CONDUITS:


STA. _+__, ___" CONDUIT
STA. _+__, ___" CONDUIT

CLEAN AND REMOVE ALL DIRT AND DEBRIS PRIOR TO 
INSTALLATION OF THE INTERNAL JOINT SEAL. FILL THE VOIDS 
WITH GROUT. SEALS CAN BE SUPPLIED WITHOUT TEST VALVES.

INSTALL THE INTERNAL JOINT SEAL PER THE REQUIREMENTS 
OF THE MANUFACTURER. THE INTERNAL JOINT SEAL, LABOR, 
EQUIPMENT AND ANY OTHER INCIDENTALS NECESSARY TO 
COMPLETE THE WORK ARE INCLUDED IN:

ITEM 611, CONDUIT MISC.: INTERNAL JOINT SEAL   ___ EACH~~

Designer Note:
Use the above note to repair failing joints and prevent soil infiltration 
on structurally sound culverts and storm sewers. Verify the size, material and shape 
availability to perform the repair with the manufacturer or the OHE.~~

D103
ITEM SPECIAL - FILL AND PLUG EXISTING CONDUIT^^


THIS ITEM CONSISTS OF THE CONSTRUCTION OF 
BULKHEADS IN AN EXISTING ____ INCH DIAMETER 
CONDUIT AND FILLING THE AREA SEALED OFF WITH 
ITEM 613, SAND OR OTHER MATERIAL APPROVED 
BY THE ENGINEER.

LOCATE THE BULKHEADS AT THE LIMITS OF THE 
AREA TO BE FILLED, AS INDICATED ON THE PLANS. 
THE BULKHEADS CONSIST OF BRICK OR CONCRETE 
MASONRY WITH A MINIMUM THICKNESS OF 12 INCHES.

PUMP THE FILL MATERIAL INTO PLACE OR BY OTHER 
MEANS APPROVED BY THE ENGINEER, SO THAT AFTER 
SETTLEMENT, AT LEAST 90 PERCENT OF THE 
CROSS-SECTIONAL AREA OF THE CONDUIT, FOR ITS ENTIRE 
LENGTH IS FILLED. THE LENGTH OF FILLED AND 
PLUGGED CONDUIT TO BE PAID FOR IS THE ACTUAL NUMBER
OF FEET (MEASURED ALONG THE CENTERLINE 
OF EACH CONDUIT FROM OUTER FACE TO OUTER FACE OF 
BULKHEADS) FILLED AND PLUGGED AS DESCRIBED ABOVE.

IN LIEU OF FILLING AND PLUGGING THE EXISTING 
CONDUIT, THE PIPE MAY BE CRUSHED AND BACKFILLED 
PER 203, OR IT MAY BE REMOVED. THE LENGTH, 
MEASURED AS PROVIDED ABOVE, WILL BE PAID FOR 
AT THE CONTRACT PRICE PER FOOT FOR, ITEM SPECIAL,
FILL AND PLUG EXISTING CONDUIT.~~

Designer Note: 
Use the above note when it is desired to abandon an existing conduit by filling 
and plugging rather than more conventional methods. If the conduit is in shallow fill, the 
designer may delete the crush and backfill option specified in the fourth paragraph. 
Add pay item 202E70000  202, Special   Fill and plug existing conduit, ___ft  to the plans.~~


D104
CROSSINGS AND CONNECTIONS TO EXISTING PIPES AND
UTILITIES^^

WHERE PLANS PROVIDE FOR A PROPOSED CONDUIT TO BE 
CONNECTED TO, OR CROSS OVER OR UNDER AN EXISTING 
SEWER OR UNDERGROUND UTILITY, LOCATE THE EXISTING 
PIPES OR UTILITIES BOTH AS TO LINE AND GRADE BEFORE 
STARTING TO LAY THE PROPOSED CONDUIT.

IF IT IS DETERMINED THAT THE ELEVATION OF THE EXISTING 
CONDUIT, OR EXISTING APPURTENANCE TO BE CONNECTED, 
DIFFERS FROM THE PLAN ELEVATION OR RESULTS IN A CHANGE 
IN THE PLAN CONDUIT SLOPE, NOTIFY THE ENGINEER BEFORE 
STARTING CONSTRUCTION OF ANY PORTION OF THE PROPOSED 
CONDUIT WHICH WILL BE AFFECTED BY THE VARIANCE IN THE 
EXISTING ELEVATIONS.

IF IT IS DETERMINED THAT THE PROPOSED CONDUIT WILL 
INTERSECT AN EXISTING SEWER OR UNDERGROUND UTILITY IF 
CONSTRUCTED AS SHOWN ON THE PLAN, NOTIFY THE ENGINEER 
BEFORE STARTING CONSTRUCTION OF ANY PORTION OF THE 
PROPOSED CONDUIT WHICH WOULD BE AFFECTED BY THE 
INTERFERENCE WITH AN EXISTING FACILITY.

PAYMENT FOR ALL THE OPERATIONS DESCRIBED ABOVE IS 
INCLUDED IN THE CONTRACT PRICE FOR THE PERTINENT 
611 CONDUIT ITEM.

Designer Note: 
Use the above note  when the designer is unsure of the exact location of a conduit 
that will require an extension or where the potential for interference between proposed and 
existing conduits exists.~~


D105
PIPE CONNECTIONS TO CORRUGATED METAL STRUCTURES^^

PROVIDE CONNECTIONS OF PROPOSED LONGITUDINAL DRAINAGE TO 
CORRUGATED METAL STRUCTURES BY MEANS OF A SHOP FABRICATED 
OR FIELD WELDED STUB ON THE STRUCTURE. FURNISH A STUB 
MEETING THE REQUIREMENTS OF 707 WITH A MINIMUM LENGTH OF 
2 FEET AND A MINIMUM WALL THICKNESS OF 0.064 INCHES.

THE LOCATION AND ELEVATION OF THE STUB ARE TO BE CONSIDERED 
APPROXIMATE AND MAY BE ADJUSTED BY THE ENGINEER TO AVOID 
CUTTING THROUGH JOINTS IN THE STRUCTURE.

THOROUGHLY CLEAN AND REGALVANIZE OR OTHERWISE SUITABLY 
REPAIR THE FIELD WELDED JOINT, IF USED. MEET WELDING 
REQUIREMENTS OF 513.21.

PROVIDE A MASONRY COLLAR PER STANDARD CONSTRUCTION 
DRAWING DM-1.1, TO CONNECT THE LONGITUDINAL DRAINAGE 
TO THE STUB, WHEN PIPE OTHER THAN CORRUGATED METAL IS 
USED FOR THE LONGITUDINAL DRAINAGE.

PAYMENT FOR CUTTING INTO THE STRUCTURE AND PROVIDING 
THE CONNECTION DESCRIBED, IS INCLUDED IN THE CONTRACT 
PRICE FOR ITEM 611 OR 522.~~

Designer Note:
Use the above note on all projects where connections are proposed to existing corrugated
metal conduits.~~


D106
ITEM 611 - TUNNEL LINER PLATE STRUCTURE^^

PROVIDE GALVANIZED STEEL OR ALUMINUM TUNNEL LINER 
PLATE MANUFACTURED BY: DSI TUNNELING, LLC; CONTECH 
ENGINEERED SOLUTIONS, LLC.; OR AN APPROVED EQUAL. 
THE MINIMUM THICKNESS SHOWN IN THE PLANS IS PROVIDED 
FOR THE DURABILITY DESIGN. INCLUDE THE PLATE THICKNESS 
IN THE INSTALLATION PLANS PER CMS 611 FOR THE STRUCTURAL 
REQUIREMENTS.

PROVIDE MATERIAL FOR GALVANIZED STEEL TUNNEL LINER PLATE 
PER 707.03. PROVIDE MATERIAL FOR ALUMINUM TUNNEL LINER 
PLATE PER 707.23. PROVIDE CONCRETE FIELD PAVING PER 611.11. 
FILL THE ANNULAR SPACE BETWEEN THE TUNNEL EXCAVATION AND 
THE TUNNEL LINER PLATE PER THE REQUIREMENTS OF 837.03 C 
AND D. FOR ALUMINUM TUNNEL LINER PLATE, PROVIDE AN 
OUTSIDE COATING PER 837.02 B PRIOR TO GROUTING OPERATIONS.~~


Designer Note:
Designer Note: Perform conduit durability design per L&D Vol. 2
  1002.2.2 to determine minimum plate thickness and/or level of protection. 
Perform durability using 707.03 Structural Plate Corrugated Steel for Steel 
Tunnel Liner Plate and 707.23 Aluminum Alloy Structural Plate for 
Aluminum Tunnel Liner Plate.~~


D107
FARM DRAINS^^

PROVIDE UNOBSTRUCTED OUTLETS TO ALL FARM DRAINS 
ENCOUNTERED DURING CONSTRUCTION. REPLACE EXISTING 
COLLECTORS WHICH ARE LOCATED BELOW THE ROADWAY DITCH 
ELEVATIONS, AND WHICH CROSS THE ROADWAY WITHIN THE 
(RIGHT OF WAY)( CONSTRUCTION) LIMITS WITH ITEM 611, 
CONDUIT, TYPE B, ONE COMMERCIAL SIZE LARGER THAN THE 
EXISTING CONDUIT.

OUTLET EXISTING COLLECTORS AND ISOLATED FARM DRAINS, 
WHICH ARE ENCOUNTERED ABOVE THE ELEVATION OF ROADWAY 
DITCHES INTO THE ROADWAY DITCH USING ITEM 611, TYPE F 
CONDUIT. THE OPTIMUM OUTLET ELEVATION IS ONE FOOT 
ABOVE THE FLOWLINE ELEVATION OF THE DITCH. INTERCEPT 
LATERAL FIELD TILES WHICH CROSS THE ROADWAY WITH 
ITEM 611, TYPE E CONDUIT, AND CARRY IN A LONGITUDINAL 
DIRECTION TO AN ADEQUATE OUTLET OR ROADWAY CROSSING.

THE LOCATION, TYPE, SIZE AND GRADE OF REPLACEMENTS 
IS DETERMINED BY THE ENGINEER AND PAYMENT MADE ON 
FINAL MEASUREMENTS.

PROVIDE EROSION CONTROL PADS AT THE OUTLET END OF 
ALL FARM DRAINS PER STANDARD CONSTRUCTION DRAWING 
DM-1.1, EXCEPT WHEN THEY OUTLET INTO A DRAINAGE STRUCTURE.

PAYMENT FOR THE EROSION CONTROL PADS AND ANY NECESSARY 
BENDS OR BRANCHES IS INCLUDED FOR PAYMENT IN THE PERTINENT 
CONDUIT ITEMS.

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN INCLUDED 
IN THE GENERAL SUMMARY FOR THE WORK NOTED ABOVE:


611 ____" CONDUIT, TYPE B   ____ FT
611 ____" CONDUIT, TYPE E   ____ FT
611 ____" CONDUIT, TYPE F   ____ FT
601 ROCK CHANNEL PROTECTION TYPE C WITH FILTER ____ CU. YD~~

Designer Note:
Use the above note where excavation may conflict with existing farm drains. 
Use of a lateral field interceptor tile located on a temporary easement 
outside the limited access right of way may be appropriate on limited access facilities.~~

D108
ITEM 611   CONDUIT MISC.: EXPAND-IN-PLACE GLASS-FIBER 
LINER PIPE^^

INSTALL AN EXPAND-IN-PLACE GLASS-FIBER LINER PIPE THAT IS 
BONDED TO THE INTERIOR SURFACE OF THE CONCRETE HOST PIPE 
TO BE REHABILITATED. ENSURE THE LINER PIPE FITS TIGHTLY 
AND CONFORMS TO THE SHAPE OF THE EXISTING PIPE WHEN THE 
EXPANSION IS COMPLETE. GLASS ALL SEAMS AND JOINTS A MINIMUM 
THICKNESS EQUAL TO THE DESIGN THICKNESS TO PRODUCE A 
CONTINUOUS JOINT-LESS LINER THAT IS IMPERVIOUS TO 
INFILTRATION AND EXFILTRATION.

PROVIDE CALCULATIONS PERFORMED AND STAMPED BY A REGISTERED 
PROFESSIONAL ENGINEER. DESIGN THE PIPE AS A STATE III LINER 
THAT INDEPENDENTLY SUPPORTS THE DEAD LOAD, LIVE LOAD, AND 
HYDRAULIC LOAD PER ASCE MOP 145, DESIGN OF CLOSE-FIT LINERS. 
USE A DESIGN SERVICE LIFE OF 50 YEARS. INCLUDE A LOAD RATING 
ANALYSIS, IF REQUIRED, PER THE BRIDGE DESIGN MANUAL 
SECTION 900 TO THE DISTRICT BRIDGE ENGINEER.

PROVIDE LINER PIPE CONFORMING TO 707.75.

PROVIDE A 2-PART BONDING SYSTEM CONSISTING OF A PRIMER AND 
BONDING AGENT, BOTH SOURCED FROM THE SAME PRODUCER, DESIGNED 
TO WORK IN CONJUCTION TO BOND THE LINER PIPE TO THE CONCRETE 
HOST PIPE. FILL VOIDS WITH GROUT COMPATIBLE WITH THE 2-PART 
BONDING SYSTEM WHERE THEY EXIST BETWEEN THE LINER AND HOST 
PIPE DUE TO DETERIORATION OF THE HOST PIPE (SPALLING, JOINT 
SEPARATION / MISALIGNMENT) AND FULL CONTACT CANNOT BE ACHIEVED.

___________________________________________________________
             CURED BONDING AGENT PROPERTIES
___________________________________________________________

TENSILE  STRENGTH                   1700 PSI (MINIMUM)

ELONGATION                          480% (MAXIMUM)

MODULUS (100%)                      430 PSI (MINIMUM)
__________________________________________________________

INSTALL LINER PIPE AND BONDING SYSTEM AS PER THE DIRECTION 
OF THE MANUFACTURER USING ONLY MANUFACTURER CERTIFIED PERSONNEL.

CLEAN AND REMOVE DEBRIS FROM THE HOST PIPE PRIOR TO INSTALLING 
THE LINER PIPE. DEWATER PIPE AND BYPASS FLOW DURING INSTALLATION. 
RESTORE ACTIVE SERVICE CONNECTIONS AFTER INSTALLATION OF THE 
LINER PIPE. PERFORM A POST-INSTALLATION VIDEO SURVEY OF THE 
PIPE AND PROVIDE A COPY OF THE VIDEO TO THE ENGINEER AS 
DESCRIBED IN SS902 SECTION 902.01 C. 

PAYMENT FOR THE ABOVE WORK IS INCLUDED IN THE CONTRACT PRICE 
FOR ITEM 611, CONDUIT MISC.: EXPAND-IN-PLACE GLASS-FIBER 
LINER PIPE _____FT~~

Designer Note: Use only to line RCP pipes 30  or greater in diameter.
This supplemental specification can be used to line the host pipe fully, or partially for spot repairs. 
Contact OHE before specifying this lining method.~~

D109
SPRING DRAINS^^

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN CARRIED 
TO THE GENERAL SUMMARY FOR USE AS DIRECTED BY THE 
ENGINEER FOR DRAINING ANY SPRINGS SHOWN IN THE PLAN OR 
ENCOUNTERED DURING CONSTRUCTION. THE FOLLOWING PIPE 
MATERIALS ARE PERMITTED: 707.33, 707.41, 707.42 or 707.45 
PERFORATED PER 707.31.

CONSTRUCT SPRING DRAINS PER STANDARD CONSTRUCTION 
DRAWING DM-1.1 AND PAID FOR AT THE CONTRACT PRICE FOR:

ITEM 605, 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS _____ FT
ITEM 605, AGGREGATE DRAINS FOR SPRINGS         _____ FT
ITEM 611, PRECAST REINFORCED CONCRETE OUTLET   _____ EACH~~

Designer Note:
Use this only where springs are present in the project area and/or the
project area is known to have spring activity. In addition to quantities required to drain
springs located by field work, estimated contingency quantities should be included for
draining springs encountered during construction.~~


D110
DRAINAGE DISCHARGE CONTINUANCE^^

FURNISH A DRAINAGE DISCHARGE CONTINUANCE FOR ANY
DRAINAGE DISCHARGE DISTURBED BY THE WORK AND NOT
SHOWN IN THE PLANS. THE LOCATION, TYPE (CONDUIT ORSWALE),
SIZE AND GRADE OF THE DRAINAGE DISCHARGE CONTINUANCE
WILL BE AGREED TO BY THE ENGINEER

FURNISH AN INSPECTION WELL AT THE RIGHT OF WAY LINE IN
ACCORDANCE WITH SCD DM-3.1 FOR EACH DRAINAGE DISCHARGE
THAT OUTLETS THROUGH A CURB OPENING, OR INTO A STORM
SEWER OR DRAINAGE STRUCTURE. THE COST IS INCLUDED IN
ITEM 611, INSPECTION WELL.

FURNISH A WELL GRADED TRANSITION BETWEEN THE DITCH AND
THE SWALEWHEN OUTLETTING  A SWALE TO A DITCH. THE COST 
FOR THE GRADED TRANSITION IS INCLUDED IN ITEM 203, 
EMBANKMENT AS PER PLAN.

FURNISH AN EROSION CONTROL PAD AS SHOWN IN SCD DM-1.1
WHEN OUTLETTING A CONDUIT TO A DITCH. THE COST FOR THE
EROSION CONTROL PAD IS INCLUDED IN ITEM 611, CONDUIT,
MISC: TYPE _ FOR DRAINAGE DISCHARGE CONTINUANCE.

FURNISH A DRILLED HOLE OR A CURB SECTION WITH A HOLE
WHEN OUTLETTING A CONDUIT THROUGH A CURB OPENING. THE
COST OF DRILLING, OR FURNISHING THE CURB SECTION WITH
HOLE IS INCLUDED IN ITEM 611, CONDUIT, MISC.: TYPE _
FOR DRAINAGE DISCHARGE CONTINUANCE.

FURNISH A DRILLED CORE HOLE WHEN OUTLETTING INTO A
STORM SEWER OR DRAINAGE STRUCTURE. THE COST OF THE
DRILLED CORE HOLE IS INCLUDED IN ITEM 611, CONDUIT, MISC.:
TYPE _ FOR DRAINAGE DISCHARGE CONTINUANCE.

DOCUMENTATION
THE CONTRACTOR SHALL FURNISH WRITTEN DOCUMENTATION
TO THE ENGINEER AND TO THE DISTRICT R/W PERMIT OFFICE.
THE DOCUMENTATION INCLUDES THE CONSTRUCTION PROJECT 
NUMBER, PID, COUNTY, ROUTE, SECTION, LATITUDE AND
LONGITUDE OF THE DRAINAGE DISCHARGE AT THE R/W, THE
NAME OF PROPERTY OWNER WITH ADDRESS, THE DATE THE
DRAINAGE DISCHARGE WAS LOCATED, THE DATE THE DRAINAGE
DISCHARGE CONTINUANCE WAS FURNISHED, A DETAILED
DESCRIPTION OF THE WORK AND PICTURES OF THE DRAINAGE
DISCHARGE CONTINUANCE (IN PDF OR JPEG FORMAT). THE
DOCUMENTATION IS INCLUDED IN ITEM 611, CONDUIT, MISC.:
TYPE _ FOR DRAINAGE DISCHARGE CONTINUANCE OR ITEM 203,
EMBANKMENT AS PER PLAN.

DRAINAGE DISCHARGE CONTINUANCE REMOVAL 
THE ENGINEER MAY REQUIRE THE NEWLY INSTALLED DRAINAGE 
DISCHARGE CONTINUANCE TO BE REMOVED.

REMOVE THE NEWLY INSTALLED CONDUIT AND ANY EXISTING 
CONDUIT TO THE RIGHT OF WAY LINE. FOR CONDUIT THAT
OUTLETS THROUGH THE CURB RESTORE THE CURB BY FILLING
THE HOLE WITH CLASS QC 1 CONCRETE OR REPLACE THE CURB
SECTION. FOR CONDUIT THAT OUTLETS TO A STORM SEWER OR
DRAINAGE STRUCTURE LEAVE 6 INCHES PROTRUDING OUTSIDE
OF THE CONDUIT. PLUG THE PROTRUDING CONDUIT WITH EITHER
A MANUFACTURED CAP OR CLASS QC 1 CONCRETE. FOR CONDUIT 
THAT OUTLETS TO THE DITCH REMOVE THE EROSION CONTROL 
PAD. RESTORE ALL AREAS AS REQUIRED. PLUG THE EXISTING 
CONDUIT REGARDLESS OF SIZE AT THE RIGHT OF WAY LINE WITH
CLASS QC 1 CONCRETE AND RESTORE ALL AREAS AS REQUIRED. 
ALL COSTS ARE INCLUDED IN ITEM 202, REMOVAL MISC. CONDUIT.

DAM THE SWALE THAT OUTLETS TO THE DITCH AT THE R/W AS
DIRECTED BY THE ENGINEER. ALL COSTS ARE INCLUDED IN ITEM
203, EMBANKMENT AS PER PLAN.

REMOVE THE INSPECTION WELL AND RESTORE ALL AREAS AS 
REQUIRED. THE COST IS INCLUDED IN ITEM 202, REMOVAL MISC. 
INSPECTION WELL.

CONDUIT MATERIAL TYPES
THE FOLLOWING CONDUIT MATERIAL TYPES ARE PERMITTED: 
707.33, 707.41 NON- PERFORATED, 707.42, 707.43, 707.45, 
707.46, 707.47, 707.51, AND 707.52 SDR35.


PAY ITEMS
EACH OF THE PAY ITEMS LISTED BELOW FOR CONDUIT
MISCELLANEOUS TYPES B, C, E AND F FOR DRAINAGE
DISCHARGE  CONTINUANCE INCLUDE CONDUIT SIZES 2 INCH TO
10 INCH. THERE IS NO COST DIFFERENTIATION FOR SIZE IN
THESE PAY ITEMS.

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN INCLUDED
IN THE GENERAL SUMMARY FOR USE AS DIRECTED BY THE
ENGINEER IN MAKING THE ABOVE DRAINAGE DISCHARGE
CONTINUANCE:


ITEM 611, INSPECTION WELL                      ___EACH
ITEM 611, CONDUIT, MISC.: TYPE C FOR DRAINAGE
                   DISCHARGE CONTINUANCE       ___FT
ITEM 611, CONDUIT, MISC.: TYPE E FOR DRAINAGE
                   DISCHARGE CONTINUANCE       ___FT
ITEM 611, CONDUIT, MISC.: TYPE F FOR DRAINAGE
                   DISCHARGE CONTINUANCE       ___FT
ITEM 202, REMOVAL MISC.: CONDUIT               ___FT
ITEM 202, REMOVAL MISC.: INSPECTION WELL       ___EACH
ITEM 203, EMBANKMENT, AS PER PLAN              ___CY~~

Designer Note:
Make a complete investigation within the project limits for the presence
of any drainage discharge of:
    Treated septic, treated wastewater, treated curtain/gradient drains, treated foundation
         floor drains 
    Sanitary wastewater, Sanitary curtain/gradient drains, or Sanitary foundation floor
         drains
    Roof drains, footer drains, or yard drains 
Send Written documentation to the District R/W Permit Office for all drainage
discharge discovered by the investigation. Include the PID, county,
route, section, latitude and longitude of the drainage discharge location at the R/W, the
name of property owner with address, a detailed description of the inspection including
date and pictures of the drainage discharge in pdf or jpeg format.  

The District R/W Permit Office will direct the designer as to the continuance or removal
and plugging of each drainage discharge discovered by the investigation. If the District
R/W Permit Office requires the drainage discharge be removed and plugged, include plan note
D111.

Add note D110 only if any drainage discharge locations are discovered during the
investigation and if the investigation yields any possibility that additional drainage
discharge locations could be discovered during construction.

Furnish a minimum of 5 feet for each lane mile of project length rounded up to the next 5
foot increment for each listed type of conduit above.

Furnish a minimum of 1 inspection well for each 20 feet of conduit estimated above.

Furnish a minimum of 25% of the conduit estimated above rounded up to the next 5 foot
increment to determine the length of Item 202 Removal Misc. Conduit.

Furnish a minimum of 10% of the above estimated Item 611 Inspection Well for
Item 202, Removal Misc. Inspection Well rounded up to the next whole number.

Furnish 50 cubic yard for Item
Item 203, ______ cubic yard Embankment As Per Plan~~


D111
UNPERMITTED DRAINAGE DISCHARGE REMOVAL^^

AT THE LOCATIONS SHOWN IN THE PLANS, REMOVE THE CONDUIT 
REGARDLESS OF SIZE TO THE RIGHT OF WAY LINE AND PLUG THE 
CONDUIT WITH CLASS QC 1 CONCRETE. FOR CONDUIT THAT
OUTLETS THROUGH THE CURB, RESTORE THE CURB BY FILLING
THE HOLE WITH CLASS QC 1 CONCRETE OR REPLACE THE CURB
SECTION. FOR CONDUIT THAT OUTLETS TO A STORM SEWER OR
DRAINAGE STRUCTURE, LEAVE 6 INCHES OF THE CONDUIT
PROTRUDING. PLUG THE PROTRUDING CONDUIT WITH EITHER A 
MANUFACTURED CAP OR CLASS QC 1 CONCRETE. FOR CONDUIT 
THAT OUTLETS TO THE DITCH, REMOVE THE EROSION CONTROL 
PAD. RESTORE ALL AREAS AS REQUIRED. PLUG THE EXISTING
CONDUIT REGARDLESS OF SIZE AT THE RIGHT OF WAY LINE WITH
CLASS QC 1 CONCRETE. ALL COSTS ARE INCLUDED IN ITEM 202,
REMOVAL MISC. CONDUIT.

AT THE LOCATIONS SHOWN IN THE PLANS, DAM THE SWALE THAT
OUTLETS TO THE DITCH AT THE R/W AS DIRECTED BY THE
ENGINEER. ALL COSTS ARE INCLUDED IN ITEM 203, EMBANKMENT
AS PER PLAN.

AT THE LOCATIONS SHOWN IN THE PLANS, REMOVE THE
INSPECTION WELL AND RESTORE ALL AREAS AS REQUIRED. THE
COST IS INCLUDED IN ITEM 202, REMOVAL MISC. INSPECTION
WELL.

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN INCLUDED
IN THE GENERAL SUMMARY: 

ITEM 202, REMOVAL MISC CONDUIT            ______ FT
ITEM 202,  REMOVAL MISC INSPECTION WELL   ______ EACH
ITEM 203,  EMBANKMENT AS PER PLAN         ______ CUBIC YARD~~

Designer Note:
Use this note when the District R/W Permit Office
has identified specific locations for the removal of 
unpermitted drainage discharges. 

Furnish the total length of conduit for the length of 
Item 202 Removal Misc. Conduit.

If a conduit size greater than 10 inch is known furnish 
that size removal item in the plans.

Furnish 50 cubic yard for Item 203 Embankment As Per Plan

Furnish the total number of Inspection Wells required for 
removal for Item 202, Removal Misc. Inspection Well~~


D112
ITEM 611 - CONDUIT BORED OR JACKED^^

WHERE IT IS SPECIFIED THAT A CONDUIT BE INSTALLED BY THE 
METHOD OF BORING OR JACKING, NO TRENCH EXCAVATION
SHALL BE CLOSER THAN ____ FEET TO THE (EDGE OF PAVEMENT)
(NEAREST RAIL). PROVIDE A STEEL CASING PIPE CONFORMING TO
748.06. JOINTS WITH A CIRCUMFERENCIAL FULLY PENETRATING B-
U4B WELD THAT IS PERFORMED BY A CERTIFIED WELDER FOR WELDING
CODE AMERICAN WELDING SOCIETY (AWS) D1.1 OR MACHINED INTERLOCKING 
JOINTS ARE PERMITTED.THE INSTALLED CASING PIPE IS THE STORM 
WATER CONVEYANCE CARRIER UNLESS OTHERWISE SPECIFIED IN THE PLANS.
HYDROSTATIC TESTING IS NOT REQUIRED FOR THE CASING PIPE.~~

Designer Note:
Provide the following pay item 611, Conduit Bored or Jacked, _____ , Type _____ , _____ Ft. 
in the General Summary. Where a conduit is installed by this method under a railroad, 
coordinate with the Rail Company to determine the allowable distance from the nearest rail 
and add note D113 to the plans. Extend the casing pipe past the edge of pavement or where 
access will be limited to the joint. Specify a concrete masonry collar per DM-1.1 between the casing 
pipe and adjacent conduit material if the casing pipe is used as the final carrier pipe.Follow SGE 
guidance for exploratory soil borings when considering this method of installation.~~


D113
ITEM 611 - CONDUIT UNDER RAILROAD^^

THE STATE SHALL PAY TO THE RAIL COMPANY ALL COSTS FOR
WATCHMEN OR FLAGGERS DEEMED NECESSARY BY THE RAIL
COMPANY, OR OCCASIONED BY THE OPERATIONS OF THE 
CONTRACTOR, OR ANY SUB-CONTRACTOR, IN CARRYING
FORWARD THE INSTALLATION OF PIPE OR CONDUIT UNDER THE
RAILROAD PER THE PLAN. THE COSTS FOR WATCHMEN OR
FLAGGERS REQUIRED BY AN ALTERNATE METHOD OF
INSTALLATION SHALL BE PAID TO THE RAIL COMPANY BY THE
CONTRACTOR. THE COSTS FOR WATCHMEN OR FLAGGERS
OCCASIONED BY THE NEGLIGENCE OF THE CONTRACTOR, OR
ANY SUB-CONTRACTOR, IN CONNECTION WITH THE INSTALLATION
OF THE PIPE OR CONDUIT SHALL BE PAID BY THE CONTRACTOR.

TRACK SUPPORTS REQUIRED BY THE RAIL COMPANY IN
CONNECTION WITH THE INSTALLATION OF THE PIPE OR CONDUIT
PER THE PLAN SHALL BE INCLUDED IN THE COMPANY FORCE
ACCOUNT WORK AND PAID BY THE STATE. THE COST OF ANY
TRACK SUPPORTS REQUIRED BY AN ALTERNATE METHOD OF
INSTALLATION OF THE PIPE OR CONDUIT SHALL BE SHALL BE
PAID TO THE RAIL COMPANY BY THE CONTRACTOR.

THE CONTRACTOR SHALL SECURE APPROVAL OF HIS
OPERATIONS FROM THE STATE AND THE RAIL COMPANY. THE
RAIL COMPANY WILL PERFORM AN ENGINEERING REVIEW OF
METHODS OF OPERATIONS AND ENGINEERING SUPERVISION OF
CONSTRUCTION WITHOUT COST TO THE CONTRACTOR.

PRIOR TO BIDDING, THE CONTRACTOR SHALL COORDINATE WITH 
THE  RAIL COMPANY TO AGREE UPON THE REQUIREMENTS OF 
WATCHMEN AND FLAGGERS TO PROTECT RAILROAD TRAFFIC
DURING THE CONTRACTOR'S OPERATIONS. THE CONTRACTOR 
SHALL EXECUTE A BOND IN FAVOR OF BOTH THE STATE AND THE 
COMPANY AS REQUIRED BY SECTION 5525.16 OF THE REVISED 
CODE OF OHIO.

THE CONTRACTOR SHALL CO-OPERATE WITH THE RAILROAD 
OFFICIALS CONCERNING WORK ADJACENT TO RAILROAD TRACKS, 
IN ORDER TO AVOID DELAY TO, OR INTERFERENCE WITH
RAILROAD TRAFFIC, AND SHALL NOTIFY THE COMPANY ___ 
HOURS IN ADVANCE OF CONSTRUCTION OPERATIONS.~~

Designer Note:
Provide this note when placing pipe culverts, sewers, or water lines under railroads.
Through coordination with the railroad complete the ___ hours that the railroad would
like to be notified by.~~


D114
REVIEW OF DRAINAGE FACILITIES^^

PRIOR TO THE START OF WORK AND AGAIN BEFORE FINAL 
ACCEPTANCE, PERFORM AN INSPECTION WITH REPRESENTATIVES 
OF THE DEPARTMENT, CONTRACTOR AND LOCALS OF ALL EXISTING 
DRAINAGE FACILITIES THAT ARE TO REMAIN IN SERVICE WHICH 
MAY BE AFFECTED BY THE WORK. THE CONDITION OF THE EXISTING 
CONDUITS AND THEIR APPURTENANCES IS DETERMINED FROM FIELD 
OBSERVATIONS. RECORDS OF THE INSPECTION ARE MAINTAINED BY 
THE DEPARTMENT.

CONFIRM ALL EXISTING SEWERS INSPECTED INITIALLY BY THE 
ABOVE-MENTIONED PARTIES ARE MAINTAINED AND LEFT IN A 
CONDITION COMPARABLE TO THAT DETERMINED BY THE ORIGINAL 
INSPECTION. THE CONTRACTOR IS RESPONSIBLE TO CORRECT ANY 
CHANGE IN THE CONDITION RESULTING FROM THEIR OPERATIONS 
AS DIRECTED AND APPROVED BY THE ENGINEER.

PAYMENT FOR ALL OPERATIONS DESCRIBED ABOVE IS INCLUDED 
IN THE CONTRACT PRICE FOR THE PERTINENT 611 CONDUIT ITEMS.~~

Designer Note:
Provide this note is to be on projects where existing drainage facilities are to remain in
service.~~


D117
MANHOLES, CATCH BASINS AND INLETS REMOVED OR
ABANDONED^^

CAREFULLY REMOVE AND STORE ALL CASTINGS WITHIN THE 
RIGHT OF WAY FOR SALVAGE BY (DEPARTMENT) (CITY) 
(VILLAGE) (COUNTY) FORCES.

PAYMENT FOR ALL OF THE ABOVE IS INCLUDED IN THE 
CONTRACT PRICE FOR THE PERTINENT 202 ITEM.~~

Designer Note:
Only use this note when the owner desires to retain the existing castings.~~


D119
ITEM SPECIAL - MISCELLANEOUS METAL^^

EXISTING CASTINGS MAY PROVE TO BE UNSUITABLE FOR
REUSE, AS DETERMINED BY THE ENGINEER. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CASTINGS OF
THE REQUIRED TYPE, SIZE AND STRENGTH (HEAVY OR LIGHT
DUTY) FOR THE PARTICULAR STRUCTURE IN QUESTION. ALL
MATERIAL SHALL MEET ITEM 611 OF THE SPECIFICATIONS AND
SHALL HAVE THE PRIOR APPROVAL OF THE ENGINEER.

THE FOLLOWING ESTIMATED QUANTITY HAS BEEN CARRIED TO
THE GENERAL SUMMARY FOR USE AS DIRECTED BY THE
ENGINEER.

SPECIAL, MISCELLANEOUS METAL   _____ LB

THE CONTRACTOR IS CAUTIONED TO USE EXTREME CARE IN
THE REMOVAL, STORAGE AND REPLACEMENT OF ALL EXISTING 
CASTINGS. CASTINGS DAMAGED BY THE NEGLIGENCE OF THE 
CONTRACTOR, AS DETERMINED BY THE ENGINEER, SHALL BE 
REPLACED WITH THE PROPER NEW CASTINGS AT THE EXPENSE 
OF THE CONTRACTOR.~~

Designer Note:
Use this note if existing castings are to be reused and which may be unsuitable.~~


D120
ITEM 611 - __", SLOTTED DRAIN, TYPE __^^

THIS ITEM SHALL CONSIST OF __ INCH DIAMETER SLOTTED
DRAIN ALUMINUM COATED STEEL CONDUIT 707.01 WITH 6 INCH 
TRAPEZOIDAL GALVANIZED SOLID BAR GRATE AS APPROVED BY 
THE ENGINEER. ALL COSTS FOR LABOR AND MATERIALS,
INCLUDING TYPE 2 BEDDING, AND BACKFILLING AS DETAILED
ON STANDARD CONSTRUCTION DRAWING DM-1.3 SHALL BE
INCLUDED IN THE PRICE BID PER FT FOR ITEM 611 - __"
SLOTTED DRAIN, TYPE __.~~

Designer Note:
Use this note in conjunction with Standard Construction Drawing DM-1.3.
Outlet slotted drain pipe into a catch basin.~~


D121
ITEM SPECIAL - PIPE CLEANOUT^^

THIS WORK CONSISTS OF REMOVING SEDIMENT AND DEBRIS FROM 
THE EXISTING DRAINAGE CONDUITS SPECIFIED IN THE PLANS. 
DISPOSE OF ALL MATERIAL PER 105.16 AND 105.17. CLEAN 
OUT TO THE APPROVAL OF THE ENGINEER.

CLEANOUT OF THE PIPE IS PAID FOR AT THE UNIT PRICE BID 
FOR ITEM SPECIAL, PIPE CLEANOUT. THIS PRICE INCLUDES 
THE COST FOR MATERIAL, EQUIPMENT, LABOR, AND ALL 
INCIDENTALS REQUIRED TO COMPLETE THE CLEANOUT.

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN INCLUDED 
IN THE GENERAL SUMMARY FOR THE WORK NOTED ABOVE:

ITEM SPECIAL, PIPE CLEANOUT, 24" AND UNDER     ____ FT
ITEM SPECIAL, PIPE CLEANOUT, 27" TO 48"        ____ FT
ITEM SPECIAL, PIPE CLEANOUT, OVER 48"          ____ FT~~


Designer Note:
This item may not be eligible for federal participation.~~


D123
EXISTING SUBSURFACE DRAINAGE^^

PROVIDE UNOBSTRUCTED OUTLETS FOR ALL EXISTING 
UNDERDRAINS OR AGGREGATE DRAINS ENCOUNTERED DURING 
CONSTRUCTION.

PROVIDE AN OUTLET PER STANDARD CONSTRUCTION DRAWING 
DM-1.1 FOR ALL UNDERDRAINS THAT OUTLET TO A SLOPE. 
UNDERDRAINS THAT CAN BE CONNECTED TO THE NEW OR 
EXISTING UNDERDRAINS AT THE END OF THE PROJECT LIMITS
AS WELL AS ALL NECESSARY BENDS OR BRANCHES REQUIRED
FOR CONNECTION ARE INCLUDED IN THE BASIS OF PAYMENT
FOR UNCLASSIFIED PIPE UNDERDRAINS.

THE FOLLOWING ESTIMATED QUANTITIES HAVE BEEN INCLUDED
IN THE GENERAL SUMMARY FOR THE WORK NOTED ABOVE:

ITEM 601, TIED CONCRETE BLOCK MAT, TYPE 1   ____ SY
ITEM 605, AGGREGATE DRAINS                  ____ FT
ITEM 611, ____" CONDUIT, TYPE F             ____ FT
ITEM 611, PRECAST REINFORCED CONCRETE OUTLET	____ EACH
ITEM 605, ____" UNCLASSIFIED PIPE UNDERDRAINS ____ FT~~

Designer Note:
Use the note on the Projects if there are existing underdrains or aggregate drains
within the project limits that are to remain. The designer shall make a complete
investigation for the presence of existing underdrain outlet locations or potential
conflict areas within the project limits and show them on the plan view sheets.~~


D124
TEMPORARY DRAINAGE ITEMS^^

TEMPORARY DRAINAGE ITEMS LABELED ON THE MAINTENANCE 
OF TRAFFIC PLAN ARE ITEMIZED ON THE MOT PLANS AND 
CARRIED TO THE GENERAL SUMMARY.~~

Designer Note:
Provide this note when temporary drainage items are required in accordance to section 1010
of the L&D. Furnish drainage items for each phase of the maintenance of traffic operations.
Removal items may be required between individual phases. Utilize drainage structures
furnished for final drainage design where feasible.~~