98133~|~1~|~1~|~01/STR~|~STP Rural Resurfacing 80/20 Fed/State UNI-4-14.16 to 26.25; DEL-4-0.00 to 1.98 98133~|~1~|~2~|~02/STR~|~STP Rural deck overlay 100% state UNI-4-25.78 over Ottawa Creek 116609~|~1~|~1~|~01/STR~|~Crack Seal 109767~|~1~|~2~|~02/STR~|~AC Overlay 109767~|~1~|~1~|~01/S5K~|~Resurfacing 109767~|~1~|~3~|~03/STR~|~full depth repairs on SR 119 through the village 122990~|~1~|~1~|~01/MPO~|~New sidewalk on Purcell ave 81599~|~1~|~1~|~01/S>2~|~Urban Paving - City of Green - SR-619 81599~|~1~|~2~|~02/MPO~|~Urban Paving. MPO is participating in partial and full depth repairs, and ada ramps, sidewalks. Balance from the City of Green. 81599~|~1~|~3~|~03/S>2/GRE~|~100% City of Green requested items. Guardrail, signal, etc. 81599~|~2~|~4~|~04/BRO~|~Replacement of SFN# 7711166, on SR619-12.04, over the Tuscarawas River. 81599~|~1~|~5~|~05/S>2/GRE~|~100% City of Green requested items. Guardrail, signal, erosion, etc. 107871~|~1~|~1~|~01/SAF~|~District Wide Signal replacement requiring R/W project. This plan split is for all CLE-125 intersections in the project. 107871~|~1~|~2~|~02/SAF~|~Intersection improvement for the CLE-132 intersection 98108~|~1~|~1~|~01/NHS~|~Resurfacing HAS-250 from the Tuscarawas Co. Line to SLM 4.22, including asphalt concrete overlay, pavement repairs and pavement markings. 98108~|~1~|~2~|~02/STR~|~Resurfacing of SR 151 from SLM 0.00 to 4.58 including 1" fine graded polymer overlay, pavement repairs and pavement markings. 121106~|~1~|~1~|~01/NFA/CANT~|~Bridge rehab. 117319~|~1~|~1~|~01/NFP~|~Adding for potential J&C involvement 77254~|~2~|~4~|~04/S>2~|~A new roadway & lighting 77254~|~2~|~5~|~05/NFP~|~This is for water and Sanitary 77254~|~1~|~2~|~02/BRO~|~4803574 LUC-75-490R I-75 NB over Ottawa River4803515 LUC-75-490C (ER) Ramp NC-1 over Ottawa RiverSuff Rating < 80 & SD 77254~|~1~|~1~|~01/IMS~|~LUC IR75 3.99-6.7 77254~|~3~|~6~|~06/S>2~|~Reconstruct about 1.03 mile of roadway and build roundabouts 77254~|~1~|~3~|~03/IMS~|~4803396 LUC-75-461 L 4803450 LUC-75-473 L4803671 LUC-75-5124803701 LUC-75-520 L4803728 LUC-75-520 R4803698 LUC-75-520 C4803779 LUC-75-5244803752 LUC-75-5774803787 LUC-75-6314803876 LUC-75-670 105665~|~1~|~1~|~01/NHS~|~Culvert WIL-6-4.33 121426~|~1~|~1~|~01/STR~|~Plan split for bridges that are STP Rural. 118141~|~1~|~1~|~01/S>2~|~Superstructure replacement for FAI-256-04.98 (SFN 2303094) 101109~|~1~|~1~|~01/NHS~|~Slide at SAN-53 and HEN-old 424. 91007~|~1~|~2~|~02/MPO~|~Park Ave. CR 143 1.66 - 3.17 91007~|~1~|~1~|~01/MPO~|~Park Ave. CR 143 3.17 - 4.06 88318~|~1~|~1~|~01/BRO~|~80/20 funding split for bridge work eligible for BRF funds. 92883~|~1~|~2~|~02/S>2~|~District Allocation 92883~|~1~|~1~|~01/S>2~|~100% City of Brunswick 92883~|~1~|~3~|~03/S>2~|~Urban Paving - 80/20 - District Allocation/City of Brunswick 92883~|~1~|~4~|~04/S>2~|~Bridge Work 75497~|~1~|~1~|~01/IMS~|~resurfacing of IR 70 from 23.69 to 26.97; includes pavement, guardrail, pavement marking 92849~|~1~|~1~|~01/BRF~|~Bridge replacement 92849~|~1~|~2~|~02/BRF~|~100% Local Items 92256~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-US 22-01.16 to 09.76 (a Principal Arterial and part of the Enhanced NHS under MAP 21); 92256~|~1~|~5~|~05/NHS/SZAN~|~"05/NHS/PV/SZAN" - 4BG6 OPWC (100% Local) - CAP $194,797.00 / 4BG7 (100% Local) for Curb Removal, Curb Replacement, LSM Backfill, Catch Basin Reconstruction, on Mus-22-(9.19-9.76) in the Village of South Zanesville 92256~|~1~|~3~|~03/S<2/ZANE~|~"03/S<2/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving, resurfacing with related work on 1) Mus-SR 719-00.04 to 00.07; 2) Mus-SR 719-00.55 to 00.61; 92256~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-US 22-00.00 to 01.16 92256~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Mus-SR 719-00.00 to 00.04: 2) Mus-SR 719-00.07 to 00.55: 91666~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint funding for 1 year FRA County guardrail ding & dent 87242~|~1~|~2~|~02/STR~|~SFN 3601684 - polymer modified asphalt jointSFN 3601714 - Saw and seal joint 87242~|~1~|~3~|~03/S<2~|~HIG 73 10.72-10.94 87242~|~1~|~1~|~01/STR~|~HIG SR73 10.94 - 14.96 Resurfacing ProjectBegin project at Hillsboro corporation limit (SLM 10.27), go south and terminate at (SLM 14.96), it is proposed to resurface the highway with asphalt concrete.80/20 split 119322~|~1~|~1~|~01/S>2~|~Resurfacing 123982~|~1~|~1~|~01/SAF~|~Convert signalized intersection into single-lane roundabout. 110276~|~1~|~1~|~01/MPO~|~Peck-Wadsworth Bridge Replacement 100876~|~1~|~1~|~01/STR~|~Resurfacing on all non-NHS routes (38,40,42). 117262~|~1~|~1~|~01/STR~|~Plan split for signs 120663~|~1~|~1~|~01/SAF~|~All work included in this plan split. 122412~|~1~|~1~|~01/S5K/CAMB~|~Rehabilitate Edgeworth Avenue, 8th Street Road and Wills Creek Valley Drive in Guernsey County. Small City Funding - SAC 4B97 95% (which includes 15% Toll Revenue Credit) / LNTP 5% Local Match capped at $1,600,000 for the Construction Phase. 89468~|~1~|~1~|~01/ENH~|~"01/ENH/OT/COL" - Lisbon. at county fairgrounds - Renovate, repair, paint and relocated historic bowstring arch truss bridge and construct pedestrian approaches at each end. Once completed, this project will provide improved pedestrian access from the parking and camping areas to the fairgrounds. 100195~|~1~|~1~|~01/NHS~|~Urban Pav 3 routes. 100195~|~1~|~2~|~02/NFP~|~Non eligible urban paving items. 90888~|~1~|~1~|~01/MPO~|~80% Federal MPO STP / 20% Local funding split for the resurfacing of Rockside Road. 92331~|~1~|~1~|~01/BRO~|~4800303 LUC SR2 18.62 Intersect: Maumee River,Rrs&Streets 92331~|~1~|~2~|~02/BRO~|~This split is for design consultant on-going services 92331~|~2~|~3~|~03/BRO~|~This split is for consultant conducting bridge painting inspection. 116401~|~1~|~2~|~02/NHS~|~Culvert replacements. 116401~|~1~|~3~|~03/STR~|~Culvert replacements. 116401~|~1~|~1~|~01/IMS~|~Culvert repairs. 123424~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 100350~|~1~|~1~|~01/STR~|~Microsurface SR 65 within Auglaize County AUG SR 65 0.00 - 5.27 AUG SR 65 7.32 - 13.36 124834~|~1~|~1~|~01/BRF~|~Single span box beam super replacement 88803~|~1~|~2~|~02/S<2~|~CRA-19-16.07 to 16.37 88803~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys CRA-19-16.37 to 28.28 101356~|~1~|~1~|~01/S<2~|~District AllocationFederal/State:Urbanized Area Outside Corp. Limit(Paving Items Etc?):CRA-SR-0004 ? SLM 06.72 to 06.94 (RT) 101356~|~1~|~2~|~02/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items):CRA-SR-0004 ? SLM 06.94 to 08.45CRA-SR-0004 ? SLM 06.72 to 06.94 (LT) 101356~|~1~|~3~|~03/S<2~|~100% Local (Bucyrus): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.):CRA-SR-0004 ? SLM 06.94 to 08.45CRA-SR-0004 ? SLM 06.72 to 06.94 (LT) 117676~|~1~|~1~|~01/MPO~|~Primary Plan Split for MPO STBG funding. 115006~|~1~|~1~|~01/MPO/BEAV~|~Widening of Dayton-Xenia Road from Meadow Bridge to Darlington Drive. Addition of curb and gutter and storm sewer, and sidewalks on both sides of the roadway. 122716~|~1~|~1~|~01/S>2~|~Funding split for MPO STBG funds. 123971~|~1~|~1~|~01/S50~|~Resurfacing along CR 22A from Wintersville's west corp. limit to Harmony Drive - 80% (4TA7/BH11) Federal funds/20% Local. 113890~|~1~|~3~|~03/STR~|~Bridge Rehabilitation 113890~|~1~|~1~|~01/S5K~|~Edge Reconstruction HUR SR 99 01.72 - 4.49Edge Reconstruction HUR SR 99 12.78-14.90Overlay only HUR SR 99 14.90-15.00 113890~|~1~|~2~|~02/STR~|~Edge Reconstruction HUR SR 99 4.49 TO 12.78 111873~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation on Friendsville Rd 84438~|~1~|~1~|~01/BRO~|~3602370 HIG SR134 6.01 Intersect: North Fork White Oak CrkBR Eligible 80 fed/20 state 01/BRO/BR/State 114776~|~2~|~1~|~01/S>2~|~conduits linked 114776~|~1~|~2~|~02/NHS~|~conduit linked 112915~|~1~|~1~|~01/STR~|~PIK 104 0.00-6.52 & SCI 104 17.43-17.70 112915~|~1~|~3~|~03/SAF~|~Center lined rumble stripes. 112915~|~1~|~2~|~02/STR~|~Bridge preventative maintenance. 112915~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 112146~|~1~|~1~|~01/BRO~|~LBR funded items plan split 97451~|~1~|~2~|~02/NHS~|~FY2018 Urban Paving Project in the City of Lebanon. This plan split is for SR 48T where the pay items are 100% City. 97451~|~1~|~1~|~01/NHS~|~FY2018 Urban Paving Project in the City of Lebanon. This plan split is for SR 48T where the pay items are split 80% State and 20% City. 100775~|~1~|~1~|~01/STR~|~Spot paving on various sections of SR 41 in Fayette and Madison counties. 109575~|~1~|~1~|~01/STR~|~Culvert Replacement 112907~|~1~|~1~|~01/S<2~|~PIC-56 from 20.66 to 22.02 112907~|~1~|~2~|~02/STR~|~PIC-56 from 22.02 to 33.93 107658~|~1~|~1~|~01/STR~|~Resurfacing on SR 235 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). 86871~|~1~|~2~|~02/IMS~|~Added funding event for On-going services to be provided by Consultant during construction of the project. 86871~|~1~|~1~|~01/IMS~|~Replace existing multi-span bridges (BEL-70-0442 L & R, SFN 0701920, 0701955) with a single span structure. Also remove multi span twin bridges (BEL-70-0475 L & R, SFN 0702013, 0702102) and replace with embankment. 91991~|~1~|~1~|~01/S<2~|~PIK 551 (0.00 2.87) 91991~|~1~|~2~|~02/S<2~|~PIK 551 (0.00-2.87) 106324~|~1~|~1~|~01/MPO~|~Installation of ADA compliant curb ramps at a number of existing pedestrian crossings in the Village of Yellow Springs. 103168~|~1~|~1~|~01/NFP~|~Paving of park driveway and parking lot. 89123~|~1~|~1~|~01/STR~|~Rehabilitate and resurface existing roadway on AUG CR 33A from 0.00 to 7.90. 111832~|~1~|~1~|~01/NFA~|~Replace Knollwood Road Bridge #246 over Chapman's Creek and modify the roadway approaches as needed. 114976~|~1~|~1~|~01/STR~|~This split is for the sections outside of the Findlay Urban area. Funding is from district allocations using SACs 4PF7 (80%) and 4PS7 (20%). 105281~|~1~|~1~|~01/NHS~|~Resurfacing US-22 105281~|~1~|~2~|~02/NHS~|~Bridge deck sealing with HMWM 100683~|~1~|~1~|~01/NHS~|~Mico-milling. 101746~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing, safety countermeasures and ADA compliance work. WAS 60 1.32-1.48. Funding 80% Federal WWW-MPO and 20% Local. 101746~|~1~|~2~|~02/NHS~|~Add items and work elements for different Ped heads and foundations on project requested by the City of Marietta. 100% Local funds. 86938~|~1~|~4~|~04/S>2/NFRA~|~100% City Funded Items 86938~|~1~|~1~|~01/S>2~|~Resurfacing of SUM SR-93 SLM 5.52 to SLM 5.98, and SUM SR-619 from SLM 3.18 to SLM 3.85, in Coventry Township, Summit County, Ohio. 86938~|~1~|~2~|~02/S>2/NFRA~|~80/20 Resurfacing costs for SR-93 from SLM 0.00 to SLM 5.52 and SR-619 from SLM 3.85 to SLM 4.87 in the City of New Franklin, Summit County, Ohio. 86938~|~1~|~3~|~03/S>2~|~Bridge rehabilitation of SFN 7707479, SUM-93-0.38 over Nimisila Creek, SFN 7707509, SUM-93-7.85 over Tuscarawas River, SFN 7707533, SUM-93-7.96 over Canal Feeder, SFN 7707568, SUM SR-93-8.00 over Ohio Canal. 11337~|~1~|~1~|~01/BRO~|~Bridge Costs - Old Project 119619~|~1~|~1~|~01/S>2/KY~|~Repair Clay Wade Bailey Bridge 87254~|~1~|~3~|~03/STR~|~HIG SR124 0.00 - 8.78 Resurfacing ProjectBrdg for rehab:3601889 HIG SR124 1.87 Intersect: Turtle Creek80/20 split 87254~|~1~|~2~|~02/S<2~|~HIG SR124 0.00 - 8.78 Resurfacing ProjectSLM 8.03 - 8.78 of urbanized area.Urban Paving eligible portion is paid for by State under the urbanized area plan split; no local match required due to small portion.Begin at Clinton County line and terminate at the Hillsboro corp limit. 80/20 split 87254~|~1~|~1~|~01/STR~|~HIG SR124 0.00 - 8.78 Resurfacing ProjectSLM 0.00 - 8.03 Rural Begin at Clinton County line and terminate at the Hillsboro corp limit. Pave Thru Brdgs:3601870 HIG SR124 0.89 Intersect: Trib Of Turtle Creek3601900 HIG SR124 3.92 Intersect: Stream80/20 split 101163~|~1~|~1~|~01/NHS~|~Various bridges. 109017~|~1~|~1~|~01/ENH~|~Bike/Ped route through Lisbon and new trail along SR 154 at 95% TAP/5% Local. 109017~|~1~|~2~|~02/NFA~|~Park and Ride upgrades 120065~|~1~|~1~|~01/NFA~|~NEVI Round 2 270-C 84516~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. MRG 60 0.00-9.36. Rural other federal aid funded 80 federal/20 state. 84516~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. WAS 60 3.60-5.18. Funded 80 federal/20 state. 112600~|~1~|~1~|~01/CMQ~|~Split 1 for work using CMAQ funds. 112600~|~1~|~2~|~02/NFP~|~Work in the project that is 100% local cost. 88341~|~1~|~1~|~01/BRF~|~Bridge replacement 115435~|~1~|~1~|~01/NFP~|~Mowing 101152~|~1~|~1~|~01/SAF~|~FUL-20A locations 101152~|~1~|~2~|~02/SAF~|~Luc SR 2 and Wil US 20A - NHS Locations 101392~|~1~|~1~|~01/S<2~|~Resurfacing FRA-62-0.00 to 1.30. General system within the Darbydale Urban Area 101392~|~1~|~2~|~02/STR~|~Resurfacing FRA-62-2.97 to 3.85. General system 101392~|~1~|~3~|~03/NHS~|~Resurfacing FRA-62-3.85 to 5>63. NHS system within the Columbus Urban Area 122461~|~1~|~1~|~01/ENH~|~Federal items. 101545~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 10.69. DSR ATH-004. 116090~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - No Cap - 100% state funded project (4PS7) - removal of retired structure. 119999~|~1~|~1~|~01/ENH~|~Installation of a sidewalk or multi-modal facilities to provide 4700' of connectivity from the Athens corp limit to the Columbus Road intersection with the Hockhocking Adena bikeway. Funded 90% Federal/10% Local. 90798~|~1~|~1~|~01/MPO~|~Remove and replace existing concrete median with type 6 barrier curb and brick pavers. Replace existing grass tree lawn between existing sidewalk and curb with concrete. Alter or reconstruct existing ADA ramps to current standards. Remove existing asphalt, apply interlayer sealer and 2" of new asphalt. Installation of thermoplastic pavement markings and replacement of traffic signal loops on Main Street from SR 741 to the North Corporation Limits. 105387~|~1~|~1~|~01/STR~|~Smooth seal rural route: CHP SR 54 SLM 0.00 to 1.70 93007~|~1~|~1~|~01/STR~|~Replace deteriorated 4 sided box culvert with new 4 sided box culvert with minimal asphalt approach work on SFN 1903195 DAR 503 0140 branch of Millers Fork. 124376~|~1~|~1~|~01/S5K/LANC~|~Resurfacing and related roadway work on CR 33 (Memorial Drive) in the City of Lancaster. 120498~|~1~|~1~|~01/NFA~|~Resurface Campground area 97097~|~1~|~1~|~01/NHS~|~Reconstruct the traffic signal installation at the US 250 and northbound IR 77 ramp intersection include replacing the highway lighting at this intersection along with the guardrail. Upgrade the southbound IR 77 ramp, CR 102 and US 250 intersection. This includes but not limited to new traffic signals, guardrail, pavement widening, new signing, and new highway intersection lighting. 120496~|~1~|~1~|~01/NFP~|~Created Plan Split for J&C involvement 123520~|~1~|~1~|~01/STR~|~GSM rock slope repair. 113784~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 559 0025, SFN 8432074. 109262~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE CR 28 0.56, SFN 5632501. Funded 100% Federal. 109062~|~1~|~1~|~01/STR~|~Rehab. Warrensburg Bridge over Scioto River 124972~|~1~|~1~|~01/STR~|~Plan split for chip seal treatment on STP Rural roadway 93133~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004058 GUE SR209 8.56 Intersect: Over Wills Creek & CSX RR; Not BR Eligible for Rehabilitation: Length=484 SD/FO(0) SR=60.8 DSR=5 93133~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004112 GUE SR209 9.84 Intersect: Over Wills Creek; BR Eligible for Rehabilitation: Length=172 SD/FO(1) SR=94.1 DSR=4 116636~|~1~|~1~|~01/NFP~|~Sign Replacement. 108471~|~1~|~1~|~01/NHS~|~Split for work on the NHS 108471~|~1~|~2~|~02/STR~|~Split for work on the rural STP system 108471~|~1~|~3~|~03/S>2~|~Split for work on the urban STP system 124930~|~1~|~1~|~01/S5K~|~Reconstruction of W. 4th Street in the City of London from N. Oak St to N. Main St including sidewalks and new drainage facilities. 87043~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2015. Various Routes and Sections in D-10. 100% State. 77040~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 119128~|~1~|~1~|~01/STR~|~All items of work associated with District wide chip seal. 110842~|~1~|~1~|~01/NHS~|~Repair culvert, embankment and pavement at slip on PIC US23 114676~|~1~|~1~|~01/IMS~|~Project to Pave inverts of bridge size culverts and perform other related repairs Including WAR-71-0908, WAR-75-0411E, and WAR-75-081 114676~|~1~|~2~|~02/STR~|~Project to Pave inverts of bridge size culverts and perform other related repairs Including WAR-741-1172 and WAR-123-1329 86482~|~1~|~1~|~01/NHS~|~Pavement work using several fund sources:o TRAC funding (80% federal / 20% state) capped @ $16.6Mo Major Rehab funding (80% federal / 20% state) - work will also include the construction of multi-purpose path. 86482~|~1~|~5~|~05/SAF~|~Added new split for Safety portion from PID 86480 86482~|~1~|~2~|~02/NHS~|~Bridge work (rehab/retrofit) for the improvement utilizing district preservation funds (80% federal / 20% state). 86482~|~1~|~4~|~04/NFP~|~100% City participation for items not eligible for any other funding. 86482~|~1~|~3~|~03/NFA~|~Work items @ 100% local participation. 86482~|~1~|~6~|~06/S>2~|~Items there damaged due to traffic that are not eligible for federal-aid. 89429~|~1~|~1~|~01/STR~|~District Wide RPM project 89421~|~1~|~1~|~01/MPO~|~road wideining and resurfacing SLM 0.638 (Red Coach) to 1.192 (Derr Road) 89421~|~1~|~2~|~02/MPO~|~resurfacing and traffic signal work SLM 0.00 (SR72) to 0.638 (at Red Coach Drive) 107225~|~1~|~2~|~02/SAF~|~Pavement marking project on various routes and sections in Gallia County for FY2021. CEAO funded. Funded 100% federal. 107225~|~1~|~1~|~01/SAF~|~Wet reflective pavement marking funded through the Safety program. Locations include Addison Pike, CR1, 0.00 to 4.74/Bulaville Pike, CR3, 0.00 to 10.58/McCormick Road, CR 6, 0.00 to 1.84. 109680~|~1~|~1~|~01/STR~|~Resurfacing SR 800 114616~|~1~|~1~|~01/NFP~|~Plan split for Bridge elec. maintenance 87200~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 120806~|~1~|~1~|~01/ENH~|~Shared use path utilizing Federal TAP and Safety funds up to Federal maximum. 96107~|~1~|~1~|~01/NFP~|~Salt Shed Doors 115541~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County CEAO Federal/State Exchange Program Funding - 4C87 (95% State) / LNTP (5% Local Match) - Replacement of SFN 6030688 carrying Rayner Lane over Meigs Creek 118726~|~1~|~1~|~01/NFP~|~added plan split. 103170~|~1~|~1~|~01/NHS~|~Reconstruction to include sidewalks, trees, etc in the City of Dayton. 95997~|~1~|~1~|~01/NHS~|~SFN 8600635 and 8600694 95997~|~1~|~2~|~02/NHS~|~WIL 6: about half mile west of bridge @ 20.46; roadway segment between the bridges (1.27 mile); and about half a mile east of bridge @ 21.73. 119447~|~1~|~1~|~01/IMS~|~Split for ramp slide repair 123912~|~1~|~1~|~01/MPO~|~Resurfacing Dayton-Xenia Road from I-675 to East Lynn Drive and Grange Hall Road from the Creekside Trail to Southview Street. 102441~|~1~|~1~|~01/NHS~|~Culvert replacement ADA 32 23.22 (CFN 1849052) 108942~|~1~|~1~|~01/NFP~|~Intersection improvements on 4 intersections in Wellsville 110413~|~1~|~1~|~01/NHS~|~FY23 Urban Paving on US 50 in the City of Cincinnati. This plan split for the 80/20 items between ODOT and the CIty. 110413~|~1~|~2~|~02/NHS/CINC~|~This plan split is for items to be paid 100% by the City. 101247~|~1~|~1~|~01/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail replacement on the NHS System 110719~|~1~|~1~|~01/IMS~|~Using district preservation allocations. 94077~|~1~|~2~|~02/NHS~|~See linked structure. 94077~|~1~|~1~|~01/NHS/CONN~|~Resurfacing of ATB-US20 from SLM 25.99 to SLM 27.68, in the City of Conneaut, Ashtabula County, Ohio. 94077~|~1~|~3~|~03/NHS/CONN~|~100% City of Conneaut items. 91932~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maint. Funds for Mowing 2 years contract 99198~|~1~|~1~|~01/STR~|~JAC CR 76 0.00-6.68 99198~|~1~|~2~|~02/S<2~|~JAC CR 76 6.68-8.82 97221~|~1~|~2~|~02/SAE~|~Signal improvements along NHS Non-Interstate routes: SR-2 @East 305th St, US-20 @SR-306 US-20 @Acacia Ave/Hart St, SR306 @Tyler Blvd. 97221~|~1~|~1~|~01/NFP~|~District-wide signal repair/maintenance work 124330~|~1~|~1~|~01/SAF~|~Plan Split for Carbon Reduction / Safety funding for pedestrian improvements 124330~|~1~|~2~|~02/STR~|~Plan Split for ODOT funded resurfacing 111491~|~1~|~1~|~01/MPO~|~Construction of a shared use path on the Wasson Way former RR corridor from Madison Road to Marburg Avenue. Construction of a new trailhead at Marburg Avenue. 111491~|~1~|~2~|~02/SAF~|~Trail connection between Madison Rd and Wasson Rd, and new traffic signal on Madison Rd for trail crossing. 122765~|~1~|~1~|~01/SAF~|~All work at FRA US 33 at Rager Rd intersection 117469~|~1~|~1~|~01/BRF~|~ATH CR 46 C 0.96 (SFN 054968) 123920~|~1~|~1~|~01/NFP~|~Deck sealing 121087~|~1~|~1~|~01/NFP~|~added RPM FY2023 plan split. 82453~|~1~|~1~|~01/S>2~|~Resurfacing and pavement planing with Item 446 asphalt concrete in Trotwood on US 35 from Bricker Avenue SLM 9.66 to the Junction of SR 49 (SLM 10.32) This is part of the Urban Paving project and the Corp Line is down the center of the roadway so it is split 50/50. 82453~|~1~|~2~|~02/S>2~|~Resurfacing and pavement planing with Item 446 asphalt concrete on US 35 from Bricker Avenue SLM 9.66 to the Junction of SR 49 (SLM 10.32). This is covered by the District allocation as the Corp Line is down the center of the roadway. 111200~|~1~|~1~|~01/MPO~|~MPO funded plan split 111200~|~1~|~2~|~02/NFP~|~100% LPA funded water line work. 116793~|~1~|~1~|~01/STR~|~Items associated with culvert and storm sewer work. 115360~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing of Chestnut St in the City of Ravenna. 115360~|~1~|~2~|~02/MPO/RAVE~|~Resurfacing of S Prospect St in the City of Ravenna. 100568~|~1~|~1~|~01/IMS~|~Replace existing deck on BEL-70-2618 (SFN 0702978) with new reinforced concrete deck to be made composite with the existing steel. 90795~|~1~|~1~|~01/MPO~|~Replacement of defective sidewalks, curbing, alley mouths, driveway approaches and curb ramps; the installation of banners, benches, trash receptacles, tree grates and other assorted amenities; and the repair/replacement and installation of landscaping on North Main Street in Dayton from Burton Avenue to Norman Avenue. 103676~|~1~|~1~|~01/S>2~|~Resurfacing of Central Avenue from Slip Lane (south of Xenia Drive) to Broad Street. Pavement repair will be performed as needed. 84548~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a Microsurfacing asphalt treatment. HOC SR 93 10.81-12.13. Urban Federal aid funded 80 Federal/20% State. 84548~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using a Microsurfacing asphalt treatment. HOC SR 93 12.13-12.25. Urban Federal aid funded 80 Federal/20% Local. 84548~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 7.31-10.81 and MEG 733 0.25-2.25. Rural other federal aid funded 80 federal/20 state. 115431~|~1~|~1~|~01/MPO~|~NOACA funded TLCI portion 115431~|~1~|~2~|~02/S<2~|~4R Maintenance - Resurfacing 115431~|~1~|~3~|~03/SAF~|~Safety Items: Sidewalks and Enhanced Crossings 115431~|~1~|~4~|~04/ENH~|~100% Local Items 123266~|~1~|~1~|~01/NHS~|~Mowing. 123007~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties. 91951~|~1~|~1~|~01/NFA~|~Design-Build project will resurface roadways and parking areas within East Fork State Park in Clermont County. 120780~|~1~|~1~|~01/S5K~|~Installation of traffic signal at US 40/Kopchak Road 108008~|~1~|~2~|~02/NFP~|~RIC IR 0071-10.68 & ERI US 0006 17.78 Locations only. 108008~|~1~|~1~|~01/NFP~|~All locations except those on split # 2 124918~|~1~|~1~|~01/STR~|~Culvert replacements. 104843~|~1~|~1~|~01/MPO~|~Guardrail replacement project. WAS CR 3 13.19-15.72 and 16.11-16.39. 80% Federal MPO-STP and 20% Local funds on Major Collector. 104843~|~1~|~2~|~02/NFA~|~Guardrail replacement project. WAS CR 3 10.52-13.19. 100% Local funded on Non-Federal Aid system. 88981~|~1~|~1~|~01/STR~|~BRO US62 13.92 - 18.97 resurfacing projectOn US62, beginning 0.07 miles north east of the US62 ramp, north east for 5.12 miles and terminate the project 0.1 mile north east of the Russellvile north corp limit, it is proposed to resurface the highway with asphalt concrete.Pave thru brdg:0801410 BRO US62 16.75 Intersect: Trib West Fork Eagle Crk80/20 split01/STR/PV/State 88981~|~1~|~2~|~02/STR~|~BRO US 62 16.60This was an emergency job under DSR# BRO-003. See PID 101629 for additional ER cost. 124782~|~1~|~1~|~01/NHS~|~Plan split 1 for conduit replacement 96628~|~1~|~1~|~01/NFP~|~Mowing contract. Maintenance contract funds. 100% state funds. SAC 4CP7. 121164~|~1~|~1~|~01/STR~|~All plans are within this split 118853~|~1~|~1~|~01/NHS~|~NHS plan split for resurfacing related items on PIC-23-16.94-17.33 in the Village of South Bloomfield. 117171~|~1~|~1~|~01/IMS~|~Split for the pavement work. 102857~|~1~|~1~|~01/NFP~|~All work is in this plan split. 100% state funds from the District Preservation budget using SAC 4PS7. 123420~|~1~|~1~|~01/S50~|~ Small City Program Funding for SR 61 reconstruction project (FY2029) with Reservoir of FY 2028 123420~|~1~|~2~|~02/S50~|~Small City Program Funding for SR 61 reconstruction project (FY2029) with a reservoir year of FY 2028 105271~|~1~|~1~|~01/STR~|~Resurfacing of COL-518 from SLM 6.72 to 10.75 114225~|~1~|~2~|~02/S>2~|~Microsurfacing. 114225~|~1~|~4~|~04/STR~|~Microsurfacing. 114225~|~1~|~3~|~03/S5K~|~Microsurfacing. 114225~|~1~|~1~|~01/NHS~|~Microsurfacing. 110507~|~1~|~1~|~01/NHS~|~Repair damaged structure JEF-22-1481 (SFN 4104277) Over CR 43 due to over height vehicle collision. 84549~|~1~|~1~|~01/STR~|~Resurfacing project. ATH 56 0.00-10.29. Federal Aid Major Collector route, Federal/State 80/20%. 84549~|~1~|~2~|~02/S<2~|~Resurfacing project. ATH 56 10.29-10.48. Urban other federal aid funded 80 federal/20 state. 84549~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay with repair treatment. ATH 56 10.48-11.44. Urban other federal aid funded 80 federal/20 local in the City of Athens. 88221~|~1~|~2~|~02/S>2~|~Pavement markings, raised pavement markers and traffic signal loops 88221~|~1~|~1~|~01/S>2~|~Mill and replace surface asphalt, along with replacement of curb, add sidewalk, adjust catch basins, manholes and watervalves 122336~|~1~|~1~|~01/S50~|~Superstructure replacement on FAI SR 360 00.07 (SFN 2303469). 101381~|~1~|~1~|~01/NFP~|~Tree removal/pruning for District 8. 111728~|~1~|~1~|~01/SAF/STOW~|~Intersection improvement at Graham Rd and Fishcreek Rd. 105939~|~1~|~1~|~01/MPO~|~resurfacing work eligible for federal-aid 96138~|~1~|~1~|~01/NFA~|~Construct a new 40' x 60' storage lean too at the ODOT Mercer County Full Service Facility. 107133~|~1~|~1~|~01/SAF~|~Install friction surface treatments at 12 locations in D8. 107133~|~1~|~2~|~02/SAF~|~Friction treatment on 4B and Symmes Rd in the City of Hamilton. 107133~|~1~|~3~|~03/SAF~|~Friction control on 4B and Symmes Rd in the City of Fairfield. 102119~|~1~|~1~|~01/STR~|~Landslide repair. 104783~|~1~|~1~|~01/NFP~|~Pavement marking and RPM's on various routes 116054~|~1~|~1~|~01/BRF~|~Replace E. Water St. bridge. 121685~|~1~|~1~|~01/NFA/GCEO~|~Mill and fill resurfacing of CR 43 (Ideal RD). 108081~|~1~|~1~|~01/S50~|~Drainage work at FRA-33-8.75 - culvert replacement, storm sewer work and other miscellaneous items 121353~|~1~|~1~|~01/IMS~|~Interstate plan split 121353~|~1~|~2~|~02/STR~|~STP Rural plan split 95241~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. ATH 78 9.96-11.353, MRG 37 8.22-9.59 and MRG 78 0.00-16.826. Rural other federal aid funded 80 federal/20 state. 108643~|~1~|~1~|~01/STR/MCEO~|~"01/STR/PV/MCEO" - CAP of $2.0M from CEAO (4b77) - 80% Federal (4B77)/20% Local (LNTP) - Resurfacing and related work on CR 616 from 0.00 to 9.22. 101527~|~1~|~1~|~01/STR~|~DSR# HAS-001 105925~|~1~|~1~|~01/NHS~|~Slide correction along State Route 5 at SLM 6.57 in Charleston Township, Portage County, Ohio. 105629~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-22-15.91-17.62 82938~|~1~|~1~|~01/STR~|~Replacement of two structures. Not BR eligible. Rural. TRU-0045 1895 7802250TRU-00534 1819 7807562 120153~|~1~|~1~|~01/SAF~|~Roundabout 114478~|~1~|~1~|~01/NFP~|~Crack sealing 93838~|~1~|~1~|~01/NFA~|~Caeser Creek Wildlife Area (CLI, GRE, WAR); Spring Valley Wildlife Area (GRE, WAR) Project consists of asphalt resurfacing, chip seal, and a wood bridge deck 124424~|~1~|~1~|~01/STR~|~Install sidewalks 118929~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items. 102922~|~1~|~1~|~01/NHS~|~NHS Portion (WOO-23: 6.02-11.84) 102922~|~1~|~2~|~02/NHS~|~CL rumble Stripes from 6.02 to 6.52 and from 7.27 to 11.84 102922~|~3~|~3~|~03/NHS~|~Adding fuel price adjustment 103946~|~1~|~1~|~01/NFA~|~This project includes the widening and reconstructing of Chester Road from Jaycox westerly to the newly improved five lane section at the future site of Cabelas. See PID 102918 100895~|~1~|~1~|~01/NHS~|~SCI-52-0.84 (SFN 7300425) Bridge Replacement 121910~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 111 4.65 (SFN 8431760). 119228~|~1~|~1~|~01/NHS~|~NHS plan split. 101099~|~1~|~1~|~01/S>2~|~Generic Plan Splite for traffic signal inspection in District 8. 93089~|~1~|~1~|~01/BRO~|~7607733 Clarenden bridge overlay and painting7607776 Harrison bridge overlay and painting7607806 Dueber bridge overlay and painting 93089~|~1~|~3~|~03/S>2~|~Resurfacing of Harrison Avenue (CR-254) from SLM 9.41 to 9.57. Funded by the City of Canton. 93089~|~1~|~2~|~02/NHS~|~7600917 24 inch watermain painting 91030~|~1~|~1~|~01/MPO~|~Minor rehabilitation 114251~|~1~|~1~|~01/NFP~|~Pavement Replacement/Repair utilizing State Oil & Shale (4SH7) Funds. 92645~|~1~|~1~|~01/MPO~|~Mill & Fill 92645~|~2~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items 90810~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay. VIN 327 0.00-4.94. Rural other federal aid funded 80 federal/20 state. 122462~|~1~|~2~|~02/NHS~|~Second plan split for construction contract costs above the Project Cap for 4PR7 (PROTECT) Funds. 122462~|~1~|~1~|~01/NHS~|~PROTECT bridges carrying SR 11 over West Fork Little Beaver Creek and US 30 from scour. 85403~|~1~|~1~|~01/NHS/Clev~|~80/20 funding split in NHS section for work that is eligible for Urban Paving funds. 85403~|~1~|~2~|~02/NHS/Clev~|~100% local items 91659~|~1~|~1~|~01/STR~|~A FHWA Disaster OH11-02 flood project. DSR HAS-004:Massive Fill Slope Failure - 200' long, 100' to Toe . Slide is in the roadway embankment beneath road. 102901~|~1~|~1~|~01/SAE~|~Installation of replacement guardrail in various locations within the County. 99992~|~1~|~1~|~01/SAF~|~Provide maintenance of traffic to address accident damage until deck edge repair project being sold in July. 89471~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Replace existing bridge over Cross Creek on existing line and grade. 101306~|~1~|~1~|~01/IMS~|~Bridge cleaning. 101306~|~1~|~2~|~02/NHS~|~Bridge cleaning. 101306~|~1~|~3~|~03/S<2~|~Bridge cleaning, 92022~|~1~|~1~|~01/NFA~|~Add Sidewalks to Warren Riverwalk 93562~|~1~|~1~|~01/BRO~|~Replace SFN 5502888 MIA 75 1373. 93562~|~1~|~2~|~02/BRO~|~Replace deficient bridge. 82672~|~2~|~2~|~02/MPO~|~Added split for 100% local items 82672~|~1~|~1~|~01/MPO~|~Underpass project on Camp Street in Sandusky 87819~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on TUS-39-15.45 to 15.77; includes asphalt overlay, pavement repairs, pavement marking 87819~|~1~|~1~|~01/STR~|~General System Minor Rehab. on TUS-39-15.77 to 19.94; includes asphalt overlay, pavement repairs, pavement marking 123399~|~1~|~1~|~01/STR~|~Rural 100593~|~1~|~1~|~01/NHS~|~Resurfacing of COL-30 112986~|~1~|~1~|~01/IMS~|~Rehabilitate the CLI-71-0725 bridge that carries Gurneyville Rd over I 71 and the CLI-71-1421 bridge that carries Starbuck Rd over I-71 by replacing the deck, painting the superstructural steel, and converting to semi-integral. 111220~|~1~|~1~|~01/ENH~|~Shared use path. Federal funds from the Transportation Enhancement Program (TAP) and CMAQ funds from the Lima MPO. TPA funds will be used first then the CMAQ funds. The Village of Bluffton will provide the match and all the funds needed after the TAP and CMAQ caps are reached. 106747~|~1~|~1~|~01/SAF~|~Safety eligible items 121709~|~1~|~1~|~01/SAF~|~Traffic signals. 119548~|~1~|~1~|~01/IMS~|~Plan split for truck parking work in former weigh station 99529~|~1~|~1~|~01/IMS~|~Reusrfacing work funded at 90/10 fed/state 120437~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT 100% State (4PS7) 96879~|~1~|~1~|~01/MPO~|~Mill 2", partial and full depth pavement repair, pave 3" asphaltic concrete. 96879~|~1~|~2~|~02/MPO~|~100% LPA items 96879~|~1~|~3~|~03/S<2~|~Urban area from SLM 3.02-7.64 97963~|~1~|~1~|~01/S<2~|~SR 365 SLM 0.00 to SLM 0.16 and SR 720 SLM 3.14 to 4.12 (OC 798) - resurface the existing roadway with asphalt concrete (2.00 in). 97963~|~1~|~2~|~02/NFA~|~SR 720 SLM 0.00 to SLM 3.14 (ZR 000) - resurface the existing roadway with asphalt concrete (2.00 in). 105316~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 3: Removal of the south utility trough (currently empty) from the existing WHV. 96489~|~1~|~3~|~03/S<2~|~Guardrail upgrade/replacement contract for FY 2016. HOC 216 0.00-0.10, GAL 588 6.95-7.74 and GAL 588 9.89-10.50. STP Urban route, funded 80% Federal and 20% State. 96489~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement contract for FY 2016. VIN 671 0.00-3.00. Not on the Federal-Aid system, still funded 80% Federal and 20% State. 96489~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement contract for FY 2016. GAL 588 0.00-6.95 and 7.74-9.89. HOC 56 9.50-14.00, HOC 93 8.70-9.00, HOC 180 0.05-16.00, HOC 216 0.10-4.20, HOC 668 0.00-0.10. MEG 689 0.00-4.15. VIN 56 1.55-1.65. VIN 278 2.95-3.20. STP Rural route, funded 80% Federal and 20% State. 96489~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement contract for FY 2016. MEG 7 0.00-8.00. WAS 7 9.75-14.00. NHS route, funded 80% Federal and 20% State. 88806~|~1~|~2~|~02/STR~|~SFN 5205883 MED-162-4.31SFN 5205913 MED-162-4.55SFN 5205948 MED-162-4.87SFN 5206006 MED-162-7.86 88806~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 88806~|~1~|~3~|~03/STR~|~Bridge < 20 ftSFN 5205972 MED-162-5.42 116986~|~1~|~1~|~01/NHS~|~added plan split. 109724~|~1~|~1~|~01/NHS~|~NHS Resurfacing 109724~|~1~|~3~|~03/NHS~|~Moraine UPP 109724~|~1~|~2~|~02/NHS~|~Germantown UPP 109724~|~1~|~4~|~04/NHS~|~Dayton UPP 91833~|~1~|~1~|~01/IMS~|~Spot paving on FRA IR 70 and FRA IR 270 at various locations 111564~|~1~|~1~|~01/MPO~|~Federally eligible items. 81871~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation Culvert Funding 4CW7(80% Federal) / 4CV7(20% State) - No CAP - Culvert replacement on FAI US22 22.92-22.94 113100~|~1~|~1~|~01/NHS~|~Split for drainage structure lining project 101453~|~1~|~1~|~01/STR~|~DSR# HOL-001 104944~|~1~|~1~|~01/MPO~|~Addition of a southbound right turn lane from Kenwood Road to US-22 (Montgomery Road). In addition, a physical divider will be constructed to separate the southbound left-turn lane from other southbound traffic on Kenwood Road. A shared use path will be constructed on the east side of Kenwood Road in place of the existing sidewalk. 98286~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP ? deck overlay and other repairs on 1) 3001989 GUE-70-20.82 Intersect: Salt Fork; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=78.0 DSR=6; 2) 3002012 GUE-70-20.82 Intersect: Salt Fork; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=78.0 DSR=7; 117467~|~1~|~1~|~01/NFA~|~Created for J&C involvement 96875~|~1~|~1~|~01/NFP~|~District wide RPM plan for FY 18 systematic RPM replacement. 109649~|~1~|~1~|~01/S<2~|~Roadway realignment 117101~|~1~|~1~|~01/ENH~|~All work for sidewalk/shared use path along this project. The work will be paid for with funds from the Transportation Alternatives Program (TAP) up to the cap and then safety funding will be used until the caps are reached. After all federal funds caps are used, any needed funds will be provided by the City of Defiance. 117101~|~1~|~2~|~02/S5K~|~All roadway reconstruction work included in this split. 101431~|~1~|~2~|~02/S<2~|~Paving in City of Shelby - 80/20 Fed/CityRIC-96-4.62 to 4.71 (Full Corp) RIC-96-4.71 to 5.13 (Split Corp) 101431~|~1~|~3~|~03/S<2~|~Paving in the City of Shelby - 100% City Cost RIC-96-4.62 to 4.71 (Full Corp) RIC-96-4.71 to 5.13 (Split Corp) 101431~|~1~|~4~|~04/S<2~|~Bridge Work for STP < 200000 101431~|~1~|~5~|~05/SAF~|~Funding for Rumble Stripes. 101431~|~1~|~1~|~01/S<2~|~RIC-61-7.69 to 13.18RIC-96-5.13 to 11.99 92859~|~1~|~1~|~01/MPO~|~added plan split 112282~|~1~|~2~|~02/NFP/GCEO~|~Guernsey County Engineer's Paving Program Funding - LNTP (100% Local) - No CAP - Resurfacing with repairs to: 1) Gue-CR 95-06.76 to 07.82; 112282~|~1~|~1~|~01/NFP/GCEO~|~Guernsey County Engineer's Oil & Shale Program Funding - 4SH7 (100% State) - See CAP Comment - Resurfacing with repairs to: 1) Gue-CR 95-04.48 to 06.76; 2) Gue-CR 95-07.82 to 08.39; 3) Gue-CR 74-03.09 to 04.66; 116604~|~1~|~1~|~01/IMS~|~Interstate Plan Split 120394~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 118924~|~1~|~1~|~01/IMS~|~conduit linked 118924~|~2~|~2~|~02/NHS~|~bridge linked 116489~|~1~|~1~|~01/NFP~|~FY28 RPM 101913~|~1~|~1~|~01/NFA~|~Motor paving Happy Hollow road, ATH CR 1A 0.00-1.82. Federal Lands Access Program (FLAP). 101457~|~1~|~1~|~01/STR/NALX~|~DSR# JEF-005 101457~|~2~|~2~|~02/STR/NALX~|~DSR# JEF-006. 104938~|~1~|~1~|~01/ERD~|~Construction of a bridge to link Centennial Trail to Wendy Park using TIGER funds. 116627~|~1~|~1~|~01/NFA~|~RPM Installation. 119651~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 100899~|~1~|~1~|~01/S<2~|~LAW 7 3.41-6.36 100899~|~1~|~2~|~02/NHS~|~LAW 7 6.36-10.72 116641~|~1~|~1~|~01/STR~|~Rural plan split for resurfacing and resurfacing related items along UNI-47. 116145~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 1206 0.01, SFN5635382. 124116~|~1~|~1~|~01/NHS~|~Pavement widening 101441~|~1~|~1~|~01/STR~|~FY 16 Allocations: $2.25M / FY 17 Allocations: $3.90M / FY18,19,20,21 Allocations: $3.50M 98360~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement contract for FY 2020. NOB 340 7.01-7.08 and NOB 564 0.00-0.03. Funded 80 federal/20 state. 98360~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2020. NOB 146 8.50-8.66, NOB 340 0.71-7.01 and NOB 574 0.00-3.68. Funded 80 federal/20 state. 98360~|~1~|~3~|~03/NFA~|~Guardrail upgrade/replacement contract for FY 2020. NOB 340 0.00-0.71 and NOB 564 0.03-13.48. Funded 80% Federal/20% State. 119190~|~1~|~1~|~01/S>2~|~Resurfacing. 119190~|~1~|~2~|~02/STR~|~Resurfacing. 121527~|~1~|~1~|~01/S>2~|~plan split to repair the landslide on CLE-126 95088~|~1~|~3~|~03/NFA/LICK~|~"03/NFA/PV/LICK" - utilizing CEAO authority for Minor Collector program to fund Minor Collector section of roadway between 1.81-10.54. Per discussion w/Michele Risko/Heidi Mertler. 95088~|~1~|~1~|~01/S<2/LICK~|~"01/S<2/PAV/LICK" Martinsburg Road from the 1.73-1.81Licking County resurfacing project utilizing LCAT funds - from 95088~|~1~|~2~|~02/STR/LICK~|~"02/STR/PV/LICK" Martinsburg Road from 10.54-14.04 Major Collector section of Martinsburg Road utilizing LCATS Funding 118846~|~1~|~1~|~01/NHS~|~Resurfacing. 124919~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2031. 87683~|~1~|~1~|~01/NHS~|~Brdg over US23 SFN 7101082 on CR13, to be replaced. Though this is part of CR13, the structure is part of US23 which is a fed aid route. 80 fed/20 state7101082 ROS CR13 16.12 Intersect: Service Rd (Old Sr-159)01/BRO/BR/State 122469~|~1~|~1~|~01/NFA~|~Resurfacing roadway at the Castalia Fish Hatchery. 104012~|~1~|~1~|~01/ENH~|~Reconstruction of sidewalks to improve pedestrian access in the City of Nelsonville. TAP funded project. Funded 80 federal/15 credit bridge/5 local. 108889~|~1~|~1~|~01/BRF~|~Bridge replacement - Federal Exchange 108889~|~1~|~2~|~02/BRF~|~Bridge Replacement - Federal Exchange - CE 94009~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 94009~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span. 94009~|~1~|~1~|~01/IMS~|~Resurfacing. 103421~|~1~|~1~|~01/S<2~|~2 !/2" mill and fill on STP <2 route in the City of Kettering - UPP 103421~|~1~|~2~|~02/NHS~|~2 1/2" mill and fill on NHS route in the City of Kettering - UPP. 103421~|~1~|~3~|~03/S>2~|~Br. No. MOT-835-0257 to be waterproofed and paved with asphalt concrete 103421~|~1~|~4~|~04/S>2~|~Full depth concrete pavement repairs 102865~|~1~|~1~|~01/IMS~|~Construction Inspection 103938~|~1~|~1~|~01/S>2~|~Earthwork and slop protection eligible for GSM funding. 104962~|~1~|~1~|~01/STR~|~Plan Split for bridges MRW-95-1.92, MRW-95-3.40, MRW-529-1.51 102213~|~1~|~1~|~01/S<2~|~LAW CR 31 0.90 ER Slide Repair. 104082~|~1~|~1~|~01/STR~|~Two-lane resurfacing project. Pavement repair. NOB 146 9.40-18.59. Rural other federal aid funded 80 federal/20 state. 117002~|~1~|~1~|~01/NFP~|~ODNR Project to improve various roads and facilities within Jesse Owens State Park. 112266~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 94906~|~1~|~1~|~01/ENH~|~Extend Hockhocking-Adena bikeway to Columbus Road in the City of Athens. Approx 2000 ft of paved bikeway. Funded 80 federal/20 local. 117504~|~1~|~1~|~01/BRF/WCEO~|~Replacement of the existing superstructure. 113802~|~1~|~1~|~01/BRO~|~replacement of SFN 3939308 95676~|~1~|~1~|~01/NHS~|~LUC-25 from SLM 8.52 to SLM 9.15 95676~|~1~|~2~|~02/NFP~|~This split is for the 100% TWI (Toledo Water Initiative) - 100% City of Toledo funds 93780~|~1~|~1~|~01/ENH~|~Construction of multi-purpose trail. 112717~|~1~|~1~|~01/IMS~|~Replace approach slabs and convert to semi integral (270, SE side), over Noe Bixby, Refugee Road, 317 109440~|~1~|~1~|~01/BRF~|~Bridge replacementBRO CR 62 0.42 (SFN 0833533) 115002~|~1~|~1~|~01/STR~|~Radar Detection. 88701~|~1~|~1~|~01/BRF~|~bridge replacement 81670~|~1~|~1~|~01/NHS~|~NHS roadway: 60-AC overlay w/ repairs 101137~|~1~|~1~|~01/STR/BPOR~|~DSR# BEL-014 101137~|~1~|~2~|~02/STR/BPOR~|~DSR# BEL-024 106912~|~1~|~1~|~01/STR~|~Pavement repairs at various locations throughout District 11. 119729~|~1~|~1~|~01/STR~|~All work included in this split. 114300~|~1~|~1~|~01/SAF~|~All work in this project which is for apply microsurfacing to improve friction along 3 curves 124967~|~1~|~1~|~01/SAF~|~Plan split for TAP eligible expenses 96227~|~1~|~1~|~01/SAF~|~Safety Funded 90/10 4HJ7/4BC7 Ramp Clear program 112811~|~1~|~1~|~01/NHS~|~Resurfacing SLM 17.42 to SLM 22.40 112811~|~1~|~2~|~02/STR~|~Resurfacing SLM 22.40 to SLM 22.61 84458~|~1~|~1~|~01/BRF~|~Cheastnut Ridge Rd SFN 7840373 CR 12 over little yankee run. 106097~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-40-7.70-8.64 88301~|~1~|~1~|~01/SAE~|~Crosswalks, Flashers, Sidewalk improvements around Wilson Middle, Fillmore, Garfield, & Harrison Schools in the City of Hamilton 118845~|~1~|~1~|~01/STR~|~Resurfacing SR 83 in HOL and TUS 103737~|~1~|~1~|~01/ENH~|~SRTS 106142~|~1~|~1~|~01/STR~|~Reconstruction of overhead flashers at SR-5 & SR-193, SR-45 & SR-87 and SR-82 & SR-534. 86684~|~1~|~2~|~02/STR~|~Overlay asphalitic concrete on CHP CR 468 0.00 to 1.00. 86684~|~1~|~1~|~01/NFA~|~Overlay asphalitic concrete on: CHP-CR-223 CCHPCR00223**C CHP-CR-223 0.030 to 1.760 CHP-CR-25 CCHPCR00025**C CHP-CR-25 6.660 to 8.640 CHP-CR-95 CCHPCR00095**C CHP-CR-95 1.010 to 3.030 CHP-CR-97 CCHPCR00097**C CHP-CR-97 0.000 to 1.980 CHP-CR-9 CCHPCR00009**C CHP-CR-9 0.000 to 2.350 CHP-CR-10 CCHPCR00010**C CHP-CR-10 4.250 to 6.010 86684~|~1~|~3~|~03/S<2~|~Overlay asphaltic concrete on 17.55 miles of country roads. This split pertains to CHP-CR-16 6.040 to 6.210. Major Collector - Urbana. 123598~|~1~|~1~|~01/SAF~|~Safety and speed management improvements along Washington St. 110014~|~1~|~1~|~01/STR~|~Work on the Rural portion of CLI-73 110014~|~1~|~2~|~02/S5K~|~Work on the Small Urban portion of CLI-73 110014~|~1~|~3~|~03/NHS~|~work on the NHS portion of CLI-73 and WAR-73. 114632~|~1~|~1~|~01/STR~|~Overlay on SCI 125. 109413~|~1~|~1~|~01/CMQ~|~work to interconnect and upgrade the signals along Cedar Rd, Warrensville Center Rd, and Green Rd that is eligible for federal-aid 23262~|~1~|~1~|~01/ENH~|~?01/ENH/OT/SCPD? ? Construct bike/ped trail from SR 212 in Stark Co across the Tuscarawas River into Tuscarawas Co. Project length ~ 2100? includes bridge to carry the multi-use Ohio & Erie Towpath Trail over the Tuscarawas River. Earmarks: OH223, TC0401 and TC0908. 96015~|~1~|~1~|~01/S>2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation on 1) FAI-SR 204-3.46 SFN 2302616; Intersect: Sycamore Creek; BR Eligible: L=93, SD/FO (2), SR = 64.2, DSR = 6; 2) FAI-SR 204-4.32 SFN 2302640; Intersect: Trib. of Sycamore Creek; BR Eligible: L=93, SD/FO (2), SR = 63.2, DSR = 5 96015~|~1~|~2~|~02/S>2~|~District Preservation - 4PS7 (100% State) - No CAP - Funding to Cover repairs 120980~|~1~|~1~|~01/S>2~|~Plan Split for TBD routes 84526~|~1~|~1~|~01/S<2~|~Resurfacing 120920~|~1~|~1~|~01/NFP~|~Plan split for electrical maintenance work 119091~|~1~|~1~|~01/NHS~|~ATH-50-33.38-39.04 118823~|~1~|~1~|~01/BRO~|~Replacement of bridge carrying SR 148 over an unnamed tributary of Captina Creek 124905~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2032. 101235~|~1~|~1~|~01/STR~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on OFAH-Rural routes 101235~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - Safety funded cable barrier installation along IR 70 in GUE County (SLM 23.3 - 25.3). 101235~|~1~|~2~|~02/S5K~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on OFAH-Urban routes 109959~|~1~|~1~|~01/SAE~|~Guardrail installation and upgrades on various county roads in Clinton County. 95680~|~1~|~1~|~01/MPO~|~Multi-Use path 103074~|~1~|~1~|~01/S>2~|~Mill and resurfacing on STP route 94277~|~1~|~1~|~01/MPO~|~Resurfacing of County Route 133 from SLM 2.38 to SLM 4.68, in the City of Green, Summit County, Ohio. 123828~|~1~|~1~|~01/SAE~|~Intersection improvements. 99632~|~1~|~1~|~01/STR~|~Reusrfacing work funded at 80% federal and 20% state 106764~|~1~|~1~|~01/BRO~|~Replacing existing deck on CAR-43-2347 (SFN 1000969) with new reinforced concrete deck made composite with the existing beams, supported by existing piers and new abutments. 84299~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal rural STP funds. 84299~|~1~|~2~|~02/STR~|~Split 2 for work to repair the slide damage. 111628~|~1~|~1~|~01/NFP~|~2 year lighting contract in ATB, MAH and TRU counties. 103991~|~1~|~1~|~01/BRO~|~Split for bridge deck replacement 101094~|~1~|~1~|~01/STR~|~Microsurface various routes in Darke County: DAR SR 185 SLM 6.56 to 11.78 = = DAR SR 121 SLM 5.80 to 14.01 101094~|~1~|~2~|~02/NHS~|~Microsurface various routes in Darke county: DAR SR 571 SLM 0.65 to 6.73 101094~|~1~|~3~|~03/S<2~|~Microsurface various routes in Darke County: DAR SR 121 SLM 14.01 to 15.21 101529~|~1~|~1~|~01/STR~|~DSR# TUS-004. 107015~|~1~|~1~|~01/NFA~|~New Entrance to the Ohio State University Mansfield Campus and North Central State College off Lexington-Springmill Road. 113608~|~1~|~1~|~01/SAF~|~Installation of new pedestrian crosswalks at two locations within the Village of West Liberty. 97016~|~1~|~1~|~01/NFP~|~Pavement markings 108468~|~1~|~1~|~01/MPO~|~Resurfacing CR 17 from 0.4 miles north of Minor Rd to Ridgewood Rd (south intersection). 112435~|~1~|~1~|~01/STR~|~Plan Slit 01/STR/PV/ - 99857~|~1~|~1~|~01/S<2~|~Replace bridge deck 100689~|~1~|~1~|~01/NHS~|~Remove and repair concrete bump-outs above and below the City of Marysville lettering on structure UNI-4-13.20 (8000093). Seal concrete area. 100689~|~1~|~2~|~02/IMS~|~All bridge work on FRA-71 Bridges 97127~|~1~|~1~|~01/SAF~|~Roundabout at Sylvania/Centennial 115017~|~1~|~1~|~01/SAE~|~Construct new traffic signal at the intersection of US 224 and Township Road 237. 100% federal funds from the District Preservation Program budget. 88223~|~1~|~1~|~01/MPO~|~Construct concrete curb and gutter, storm drainage and sidewalk. Widen pavement to accommodate the addition of Bike Lanes on both sides of the road on Wolf Creek Pike from Little Richmond Road to SR 49 connector. Bridge modifications are required to accommodate the sidewalk and bikeway as well as modifications needed at the Railroad Crossing. Pavement markings will be brought up to standard and bike lane markings included. 106926~|~1~|~1~|~01/BRO~|~Replace existing bridge (CAR-542-1263, SFN 1002074) with new composite boxbeam bridge. 91033~|~1~|~1~|~01/S>2~|~Resurfacing of Ohio Avenue (CR-351). 112938~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-70-11.21-11.98 106369~|~1~|~1~|~01/STR~|~Remove and replace culverts on rural routes. 96885~|~1~|~1~|~01/BRF~|~Bridge replacement. 96885~|~1~|~2~|~02/BRF~|~100% local items 96885~|~1~|~3~|~03/BRF~|~100% Local Project Costs 102384~|~1~|~2~|~02/S<2~|~SCI 73 25.85-26.47 102384~|~1~|~3~|~03/NHS~|~100% Local for curb & full depth repairs. 102384~|~1~|~1~|~01/NHS~|~SCI 23D 0.00-1.03SCI 23R 0.45-2.680/20 Federal/Local 102384~|~1~|~4~|~04/NHS~|~SCI 23 2.60-2.67 80/20 Federal/State 102384~|~1~|~5~|~05/NHS~|~Bridge maintenance SCI 23 1.90 (SFN 7300042) 102384~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 110596~|~1~|~1~|~01/NHS~|~plan split for signal upgrades and added radar on the NHS route, CLE-125 110596~|~1~|~2~|~02/S>2~|~plan split for signal upgrades and added radar on Lg Urban Routes, HAM-22 + WAR-22. 110596~|~1~|~3~|~03/SAF~|~Ramp meter improvements HAM-75NB at Mitchell. 110596~|~1~|~4~|~04/SAF~|~Install Flashing Yellow Arrow (FYA) on US-22. 104002~|~1~|~1~|~01/STR~|~Pavement work in the Village of Arlington including full depth repair. All funds are from the District Preservation Program. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. There are no local funds in this split. 104002~|~1~|~2~|~02/NFP/ARL~|~Non pavement work in the Village of Arlington including curb and gutter, drive approaches and storm drainage. This work in the responsibility of the Village of Arlington to pay for. Funding from the Ohio Public Works Commission (OPWC). Any funding needed over the OPWC funds are the responsibility of the Village. 116804~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the City of Akron. 116804~|~1~|~2~|~02/S>2/AKRO~|~Full and Partial Depth repairs and ADA curb ramps. 92073~|~1~|~1~|~01/NFP~|~Lexington Outpost Salt Building Repair 84964~|~1~|~1~|~01/S<2~|~Brdg replacement. 7303513 SCI SR139 1.73 Intersect: StreamOn SR139. 0.22 mile north east of Portsmouth corporation limit. 80 Fed/20 State. 01/S<2/BR/State 106548~|~1~|~1~|~01/NHS~|~Improvements at the US 62/Stygler Rd and Stygler Rd/Agler rd intersections 97448~|~1~|~1~|~01/NFA~|~Resurfacing of West Golf Drive from Mill Creek Park Golf Course Parking Lot to Shields Road. 117965~|~1~|~1~|~01/SAF~|~Safety funding eligible work 109691~|~1~|~1~|~01/NHS~|~Resurfacing SR 11 121961~|~1~|~1~|~01/SAF~|~Plan split for all roundabout work at US-6 & CR-24 85149~|~1~|~2~|~02/BRO~|~City of Westlake requested anti-graffiti features for the concrete sealer and has agreed to pay 100% of the cost above that normal (epoxy urethane) concrete sealer. 85149~|~1~|~1~|~01/BRO~|~Superstructure replacement for SFN 1810499 (CUY-254-0449) over Sperry Creeak approximately 0.86 mile east of SR-252. 118150~|~1~|~1~|~01/S50~|~Landslide repair by drilled shaft wall. 81086~|~1~|~1~|~01/S<2~|~Resurfacing in London urban area and general system (fed/state) pavingMAD-56: 8.46-8.4801/S<2/PV/ 81086~|~1~|~3~|~03/STR~|~Bridge work (at 80/20, not BR elig) - asphalt OL and patching, sealing4901819 MAD SR56 11.77 Intersect: Oak Run4901843 MAD SR56 12.23 Intersect: Walnut Run4901983 MAD SR56 20.61 Intersect: Sugar Run4902041 MAD SR56 23.98 Intersect: Deer Creek03/STR/BR/ 81086~|~1~|~2~|~02/STR~|~Resurfacing in rural area and general system (fed/state) pavingMAD-56: 8.48-24.3502/STR/PV/ 81086~|~1~|~4~|~04/IMS~|~Bridge work (non BR) on 1 structure:4901959, MAD-56-20.01, over I-71 81086~|~1~|~5~|~05/STR~|~Pavement markings / RPMs 94116~|~1~|~2~|~02/IMS~|~Minor Bridge work to linked structure > 20' span. 94116~|~1~|~4~|~04/S>2~|~Minor bridge work to linked structure > 20' span. 94116~|~1~|~3~|~03/NHS~|~Minor bridge work to linked structure > 20' span. 94116~|~1~|~5~|~05/S>2~|~Minor bridge work to linked structure 10' to 20' span. 94116~|~1~|~1~|~01/S>2~|~Resurfacing TRU SR 304 1.03 to 5.88. 99195~|~1~|~1~|~01/NFA~|~Ross County various routes guardrail. 25192~|~1~|~3~|~03/STR~|~"03/STR/OT/ " - District Preservation 4MP7(100% State) - No CAP - Pavement Markings on 1) FAI SR256 14.18-24.63; 2) PER SR256 0-0.16 25192~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on PER SR188 0-4.48 25192~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI SR256 14.18-24.63; 2) PER SR256 0-0.16 25192~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation 4MP7(100% State) - No CAP - Pavement Markings on PER SR188 0-4.48 112739~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to UNI-33-8.79 L/R 97718~|~1~|~1~|~01/MPO~|~Resurface Clardon Troy Road using 80% federal MPO STP funds matched w/20% Local funds. 92744~|~1~|~1~|~01/NHS~|~Rockscaling on MEG 33 4.48, 6.04, 6.07, 6.30, 6.45, 7.21, 7.32, 7.61, and 9.36. GSM funded projects. NHS route funded 80 federal/20 state. 89407~|~1~|~1~|~01/S<2~|~Landslide repair using GSM Funds. Work Length approximately 400 ft. GAL 160 1.27. Federal/State 80/20%. 110098~|~1~|~1~|~01/NFP~|~Pavement marking plan split 100361~|~1~|~2~|~02/STR~|~Overlay SR 49A with asphalt concreteDAR SR 49A 0.00 to 1.84DAR SR 49A 2.87 to 4.09 100361~|~1~|~1~|~01/NHS~|~Overlay SR 49 with asphalt concreteDAR SR 49 8.92 to 12.22 101118~|~1~|~1~|~01/STR~|~DSR# BEL-011 120735~|~1~|~1~|~01/STR~|~Resurfacing after intersection improvement. 120735~|~2~|~2~|~02/SAF~|~Roadway profile improvement along SR 158 94184~|~1~|~1~|~01/NHS~|~US 250 southbound right turn lane onto Westwind Drive 82882~|~1~|~1~|~01/NFA~|~BRO CR13 Covered Brdg Replace 0833126 BRO CR13 3.14 Intersect: Eagle CreekCEAOBRO CR13 3.01 (SFN 0833188)On CR13 (North Pole Road), 3.3 miles from US68, it is proposed to construct a new bridge beside the old covered bridge and leave the old covered bridge in place. SFN 833126. 80 Fed/20 Local Match by Brown County01/NFA/BR/Brown 102789~|~1~|~1~|~01/S>2~|~This plan split is for work on NHS bridges. 112801~|~1~|~1~|~01/STR~|~Rural Plan Split: MAD-142-11.21-13.34 MAD-142I-0.00-0.20 82420~|~1~|~4~|~04/NFP/AT&T~|~Plan Split for removal of AT&T lines from bridge. Responsibility of the utility. 82420~|~1~|~5~|~05/NFP/OE~|~Ohio Edison to abandon underground electric and pull boxes. 82420~|~1~|~1~|~01/BRO~|~Plan Split for SFN 7839758 TRU Olive Street Bridge over the Mahoning River and Railroads 82420~|~1~|~3~|~03/NFP/DEOG~|~Plan Split for removal of gas line from bridge. Responsibility of Dominion East Ohio Gas company. 82420~|~1~|~2~|~02/NFP/McDn~|~Plan Split for removal of Sanitary Sewer from bridge. Responsibility of the Village of McDonald. 83108~|~1~|~1~|~01/NHS~|~"O1/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI US22 11.96-13.16; 2) FAI SR37 13.69-14.4 83108~|~1~|~5~|~05/NHS/LANC~|~"O5/NHS/OT/LANC" - Local Funds 4BG7(100% Local) - No CAP - Hauling of RACP in the City of Lancaster on 1) FAI US22 13.16-18.05; 2) FAI SR37 12.92-13.69; 3) FAI SR37 14.4-15.58; 83108~|~1~|~2~|~02/NHS~|~"O2/NHS/PV/LANC" - 75% District Preservation 4PF7(80% Federal) / 4PS7(20% State); 25% Lancaster Big City (STP)Funding 4TA7 (80% Federal) / 4PS7 20% State) - CAP of $775,497.01 of Lancaster's 4TA7 Large City Funds - Urban Paving in the City of Lancaster on 1) FAI US22 13.16-18.05; 2) FAI SR37 12.92-13.69; 3) FAI SR37 14.4-15.58; 83108~|~1~|~3~|~03/STR~|~"O3/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI US22 10.75-11.96; 2) FAI US22 18.08-18.57 83108~|~1~|~7~|~07/NHS/LANC~|~"07/NHS/PV/LANC" - Urban Paving on US 22 (Main St) - 4PF7 (80% Federal) / 4BG7 (20% Local) - CAP District Preservation $84,960.00 federal funds) - Share of Uban Paving asphalt resurfacing cost for Main Street in Lancaster. Any overages revert to Plan Split 4 for coverage at 100% City of Lancaster 83108~|~1~|~6~|~06/S<2/LANC~|~"O6/S<2/PV/LANC" - 75% District Preservation 4PF7(80% Federal) / 4PS7(20% State); 25% Lancaster Big City (STP)Funding 4TA7 (80% Federal) / 4PS7 20% State) - CAP of $256,096.12 in City of Lancaster's 4TA7 funds - Urban Paving in the City of Lancaster on 1) FAI SR188 14.48-16.02; 2) FAI SR158 00.29-02.48; 83108~|~1~|~4~|~04/NHS/LANC~|~"O4/NHS/OT/LANC" - Local Large City Funds 4TA7(80% Federal) / 4BG7(20% Local) - No CAP - Curb ramps and other special request items for the paving in the City of Lancaster on 1) FAI US22 13.16-18.05; 2) FAI SR37 12.92-13.69; 3) FAI SR37 14.4-15.58; 95178~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 18.97 (SFN 3701689) and HOC 328 6.79 (SFN 3703754). Rural other federal aid funded 80 federal/20 state. 100380~|~1~|~1~|~01/STR~|~Work on SR 114 in Paulding County from US 127 to the Putnam County Line, SLM 12.05 to 24.36. All funds from the District Preservation Program budget. No local funds. Federal funds are rural STP. 92661~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing the existing roadway with asphalt concrete from SLM 8.72 to SLM 9.90. 81713~|~1~|~1~|~01/BRO~|~Replace steel twin pipe structures at two locations (TUS-36-0769, SFN 7900279 and TUS-360833, SFN 7900309) with four-sided box structures. 82357~|~1~|~1~|~01/BRF~|~CEAO bridge replacement with Union County EngineerBR funds not on federal aide systemUNI-CR 110-1.16/Delawrae County Line Rd over Blues CreekSFN 8032866 105906~|~1~|~1~|~01/NHS~|~Split for urban paving eligible items on the NHS Stsem 105906~|~1~|~2~|~02/S>2~|~Plan split for urban paving eligible items on the STP system 105906~|~1~|~3~|~03/S>2~|~Plan split for work items not eligible for urban paving funding and paid 100% by local share 94638~|~1~|~1~|~01/S>2~|~80% federal / 20% local fundin split using MPO STP funds to resurface Emery Road. 115684~|~1~|~1~|~01/IMS~|~Split for resurfacing work 94278~|~1~|~1~|~01/ENH/KCEO~|~"01/ENH/OT/KCEO" - Knox County Heart of Ohio Trail Phase 6 - Construction of muliti-use path from Grahram Road to Thayer Road 106444~|~1~|~1~|~01/SAF~|~Install wrong way signs with radar technology along as various places on IR 71 from Lytle Tunnel to the Warren County line. 113143~|~1~|~1~|~01/S<2~|~Roadway resurfacing and striping on Vance Road in the City of Moraine. 123914~|~1~|~1~|~01/MPO~|~Construction of sidewalk on the south side of W. 4th Street to fill in 3 existing gaps in the sidewalk network. Construction of a Rectangular Rapid Flashing Beacon (RRFB) at David Boulevard. 112507~|~1~|~2~|~02/S>2~|~Spit 2 for MPO/state funded work in Gates Mills. 112507~|~1~|~1~|~01/MPO~|~Split for MPO/local funded work on the urban system in Mayfield Hts 112507~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 114664~|~1~|~1~|~01/NFP~|~PM (B) FY27. 118826~|~1~|~1~|~01/CMQ~|~Install Bike hub 76997~|~1~|~1~|~01/IMS~|~Project on I-70 from Kelton Ave to SR-310 to address safety & congestion.Currently unfunded. 104323~|~1~|~1~|~01/NHS~|~Split for resurfacing work 99869~|~1~|~1~|~01/NHS~|~Central (SR-120)/Talmadge intersection 99869~|~1~|~2~|~02/NFP~|~100% City - Resurfacing Column in Plan General Summary. Funds will be from Ottawa Hills paid thru City of Toledo. 99731~|~1~|~1~|~01/IMS~|~Interchange split 99731~|~2~|~4~|~04/IMS~|~I 475 over Monclova Road from PID 96482 99731~|~2~|~3~|~03/IMS~|~Widen 475 interstate. 99731~|~3~|~5~|~05/NHS~|~Luc US 24 11.56 to 14.60 99731~|~1~|~2~|~02/IMS~|~US-20A bridge over I-475 99731~|~1~|~6~|~06/S>2~|~Plan split for locally funded additional cost to upgrade shared-use path 99731~|~1~|~7~|~07/NFA~|~Adding split for Bridge Hit 115214~|~1~|~1~|~01/BRF/CCEO~|~Replacement of Bridge CLI TR 256 0.02 (SFN: 1447165) 101960~|~1~|~1~|~01/NHS~|~Mill and Fill under the UPP on:DAR SR 49 SLM 17.64 to 18.03DAR SR 571 SLM 11.12 to 11.23 101960~|~1~|~2~|~02/S<2~|~Mill and Fill under the UPP on:DAR US 36 SLM 13.28 to 13.39DAR SR 571 SLM 12.18 to 13.65 102762~|~1~|~1~|~01/S<2~|~Plan Split 01 created for STP < 200000 routes in Washington C.H. Urban Area. 118122~|~1~|~1~|~01/NHS~|~added plan split. 85111~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on TUS-800-7.51 to 7.83; includes asphalt overlay, pavement repairs, pavement marking 85111~|~1~|~1~|~01/STR~|~General System Minor Rehab. on HAS-800-3.34 to 12.72 and TUS-800-0.00 to 7.51; includes asphalt overlay, pavement repairs, pavement marking 119234~|~1~|~1~|~01/STR~|~Rural Plan Split 119234~|~1~|~2~|~02/S5K~|~All items of work associated with resurfacing of SR 187. 103193~|~1~|~1~|~01/NFP~|~Split for traffic signal maintenance 119603~|~1~|~1~|~01/SAF/CTID~|~Plan Split for federally eligible expenses 106715~|~1~|~1~|~01/ENH~|~Work inside the Findlay Urban Area 94132~|~1~|~1~|~01/NHS~|~Major Rehabilitation of MAH US 224 from SLM 13.66 to SLM 19.62. 94132~|~1~|~2~|~02/S>2~|~Resurfacing of MAH US 224 from 13.64 to 13.66 and MAH SR 625 from 0.00 to 0.22. 94132~|~1~|~3~|~03/NHS~|~Minor bridge work to the linked structures > 20' span. 94132~|~1~|~4~|~04/NHS~|~Minor work to linked structure with a 10' to 20' span. 94132~|~2~|~5~|~05/S>2/Meij~|~Intersection improvement at SR-625 and Tippecanoe Road, including signing, signal, turn lanes, in Boardman Township, Mahoning County, Ohio. 94132~|~1~|~6~|~06/SAF~|~Safety items along US-224, including additional striping and quick curb, signing, radar detection. 103256~|~1~|~1~|~01/NFA~|~AC overlay with repairs on non Federal routes: CHP SR 245 SLM 6.16 to 10.72LOG SR 245 SLM 0.00 to 0.87 95192~|~1~|~2~|~02/STR~|~Landslide repair project. DSR NOB-009R (NOB 145 9.45). ER project funded 80 federal/20 state. 95192~|~1~|~1~|~01/STR~|~Landslide repair project. DSR NOB-007R (NOB 145 2.26). ER project funded 80 federal/20 state. 117290~|~1~|~1~|~01/NFA~|~ODNR resurfacing 122861~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing of 17th and Velma Avenue entrance drive. 122861~|~1~|~2~|~02/NFA~|~Pavement repairs and resurfacing of parking lot south of the Ohio Village and Historical Records Storage at the History Connection. 113806~|~1~|~1~|~01/BRF~|~Replacement of SFN 3940624 85540~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation - No CAP -Costs associated with widening of SFN 4503511 and SFN 4503546 85540~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation - No CAP - 1) 4503511 LIC IR70 13.67 Intersect: Ir70 Over Tr 171 - Qualifies for Rehabilitation - 273' - SD(1) - SR=54.7; 2) 4503546 LIC IR70 13.67 Intersect: Ir70 Over Tr 171 - Qualifies for Rehabilitation - 273' - SD(1) - SR=54.7 - - Eligible for all costs associated with the rehabilitation of the existing structures and lanes. 100004~|~1~|~1~|~01/IMS~|~Sealing all Major Bridges within District 4. 108798~|~1~|~1~|~01/SAF~|~Signal upgrade 100% federal (90% ORDC 4FP7/10 ORDC 4FA7 as TRC) at the intersection of CR 2 and Market/William Street. 108798~|~1~|~2~|~02/S<2~|~Pavement rehabilitation on CR 2 from northbound SR 7 ramps to River Rd. with Oil and Shale funds (100% 4SH7). 123745~|~1~|~1~|~01/NFP~|~This project is the District?s long line maintenance contract to maintain the center line, edge line, lane line, and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district. 116732~|~1~|~1~|~01/NFA~|~Created for J&C involvement 100571~|~1~|~1~|~01/S<2~|~ROS 28 (0.00-0.96) 100571~|~1~|~2~|~02/STR~|~ROS 28 (0.96-8.80) 123564~|~1~|~1~|~01/SAE~|~Sugn Support replacement on interstates near Cincinnati 95770~|~1~|~1~|~01/STR~|~SEN-4 from SLM 7.56 to SLM 13.23 107287~|~1~|~1~|~01/NHS~|~Plan split for work items eligible for Urban Paving Funding 107287~|~1~|~2~|~02/NHS~|~Plan split for paving work items that are 100% Local and above the Urban Paving funding 107287~|~1~|~3~|~03/SAF~|~Plan Split for work associated with Safe Routes to School fudning 112897~|~1~|~1~|~01/CMQ~|~Split for work to construct EV charging stations 93655~|~1~|~6~|~06/BRO~|~test 93655~|~1~|~5~|~05/NHS~|~test 93655~|~1~|~1~|~01/IMS~|~abcdefgabcdefgabcdefg abcdefgabcdefgabcdefg abcdefgabcdefg bcdefgabcdef gabcdefgabcdefg abcdefg bcdefgabcde fgabcdefgabcdef gabcdefg 93655~|~1~|~3~|~03/BRO/test~|~test 93655~|~1~|~2~|~02/ENH~|~123 93655~|~1~|~4~|~04/BRO~|~Test. 116524~|~1~|~1~|~01/NHS~|~Resurfacing. 80974~|~1~|~1~|~01/IMS~|~Work to widen the Transportation Blvd structure over IR-480 which is eligible for earmark funds for the improvement of this route in Garfield Hts. 80974~|~1~|~2~|~02/IMS~|~Work on widening the IR-480 WB off ramp in coordination with the Transportation Blvd roadway improvements. Work on the IR-480 EB on ramp in coordination with the widening the Transportation Blvd bridge over IR-480. 80974~|~1~|~3~|~03/S>2~|~Work on Transportation Blvd pavement widening and improvements including affected sidewalks and drive apron work. Portions of this work is eligible for earmark funding depending on availability. ODOT will participate only on work affecting the D12 HQ property. 93116~|~1~|~1~|~01/STR~|~District Allocation 113885~|~1~|~1~|~01/NFA~|~Widen pavement & shoulders on both sides of the roadway to improve the usability and the safety of this facility. 87304~|~1~|~1~|~01/NHS~|~Plan Split for NHS routes other than I-275. These routes are: CLE-32 in Batavia and CLE-52 between New Richmond and Point Pleasant. 87304~|~1~|~3~|~03/STR~|~Plan Split is for the Rural locations. These locations include: GRE-72 and GRE-235 87304~|~1~|~4~|~04/S>2~|~Plan Split is for the Urban locations on the project. These locations include HAM-32 87304~|~1~|~2~|~02/IMS~|~Plan Split for the interstate routes. These routes include both locations on HAM-275 101469~|~1~|~1~|~01/NFP~|~Raised Pavement Markers 98602~|~1~|~2~|~02/NHS~|~Split for work on the NHS 98602~|~1~|~3~|~03/S>2~|~Split for work on the urban STP system. 98602~|~1~|~1~|~01/IMS~|~Plan split for work on the interstate system 98602~|~1~|~4~|~04/NFA~|~Split for work not on the federal aid system at 100% state 98602~|~1~|~5~|~05/NFP~|~Split for 100% local items of work by Mayfield Village, 104988~|~1~|~1~|~01/NHS~|~Plan Split 105866~|~1~|~1~|~01/IMS~|~Added CO CO Engr 01 plan split. 119253~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 103361~|~1~|~1~|~01/BRF~|~Local bridge replacement. 92851~|~1~|~1~|~01/STR~|~SCI SR348 6.94 Slide Repair on SR348, proejct is 0.71 mile east of SR73 junction. 01/STR/OT/State 120861~|~1~|~1~|~01/MPO~|~install Sidewalk on Springdale Road in Colerain Twshp 111158~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 23145~|~1~|~1~|~01/BRF/PCEO~|~"01/BRF/BR/PCEO" - County Engineer's Association Funding 4B87(95% Federal) / 4BG7(5% Local) - CAP = $1,417,495.00 Federal dollars - Replacement of: 1) 6430880 PER CR23 2.70 Intersect: Rush Creek; BR Eligible for Replacement: Length=100 SD/FO(2) SR=27.3 DSR=5; 2) 6433340 PER TR169 0.04 Intersect: Buckeye Fork; BR Eligible for Replacement: Length=46 SD/FO(1) SR=48.0 DSR=4; 89213~|~1~|~1~|~01/ENH~|~Constructin an addition to the existing Logan County Museum in Bellefontaine, Ohio 115080~|~1~|~1~|~01/STR~|~Culvert rehab and replacement on NOB 821 18.72, CFN 18887552. 116162~|~1~|~1~|~01/STR~|~Culvert plan split 123133~|~1~|~1~|~01/NHS~|~Overlay existing concrete pavement with Asphalt Concrete 101483~|~1~|~1~|~01/NHS~|~This plan split includes FAY US 35 0.00-11.97 101483~|~1~|~2~|~02/STR~|~This plan split includes sections of FAY SR 435, FAY SR 729, FAY SR 734 88727~|~1~|~1~|~01/BRO~|~Replace existing structure over Dry Creek (SFN MIA SR 41 0124). 105282~|~1~|~2~|~02/NHS~|~Work associated with items not eligible for urban paving, including curb ramps, auxiliary pavement markings, etc. 105282~|~1~|~1~|~01/NHS~|~Asphalt resurfacing of SR 39 in the City of East Liverpool 109328~|~1~|~1~|~01/STR~|~Wil CR 14 and CR 27 resurfacing 109328~|~1~|~2~|~02/NFA~|~Plan split for special federal resurfacing funds on non-federal aid minor collector section of CR 27 from SR 576 to SR 15 93209~|~1~|~1~|~01/STR~|~Overlay bridge deck with latex modified concrete, patch abutments, and backwalls using annodes on SFN 5401801 MER 118 2474 ov the St. Marys River. 121606~|~1~|~1~|~01/BRO~|~Plan split for overlay of bridge deck, approach slabs and expansion joint repair. 10787~|~1~|~4~|~04/BRO~|~Split for 100% local pariticipation - CEI 10787~|~1~|~3~|~03/BRO~|~Split for 100% local participation - Dominion 10787~|~1~|~1~|~01/BRO~|~80/20 fund split for federal BRF funds for the waterline relocation portion of the project. 10787~|~2~|~2~|~02/BRO~|~80/20 fund split for federal BRF funds for the bridge portion of the project 121364~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 172 over Middle Branch Sandy Creek. 121813~|~1~|~1~|~01/MPO/POCE~|~Resurfacing. 104650~|~1~|~1~|~01/NFA~|~The County will widen and reconstruct 3200 feet of Gypsum Road 102340~|~1~|~1~|~01/STR~|~Chip sealing SR 542 93507~|~1~|~1~|~01/ENH~|~added plan split info - OKI TE funded 105222~|~1~|~1~|~01/STR~|~Micro surfacing SR 800 98145~|~1~|~1~|~01/NHS~|~NHS 80/20 Non-BR FRA-315-11.66 under Wilson Bridge Rd 92154~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 1 year Landscape Maintenance contract 95993~|~1~|~1~|~01/IMS~|~Mowing Contract for the East Central Region. 122007~|~1~|~1~|~01/ERD~|~City of Sunbury, Reconstructing and widening SR 37 (E Granville St) to two 12-foot lanes with a 10 foot SUP on one side. Also includes connecting the Ohio and Erie Trail by removing the old railroad bridge abutments and constructing a new pedestrian bridge over the roadway. 23730~|~1~|~1~|~01/IMS~|~resurface LUC IR75 7.82-11.86 116821~|~1~|~1~|~01/STR~|~Resurfacing. 103439~|~1~|~1~|~01/STR~|~Pavement Split 112189~|~1~|~1~|~01/NFA~|~Plan split for Pedestrian Facility Bridge. 92040~|~1~|~1~|~01/SAF~|~Add a new westbound to northbound ramp from SR73 to IR75. Retime/Reconfigure signal because the left turn from SR73 is no longer needed. 111004~|~1~|~1~|~01/IMS~|~Split for bridge work 87375~|~1~|~1~|~01/CMQ~|~ Project will include access management from the intersection of Meadowlark Drive & Wooster Pike (US-50) to the Mariemont corp. line on Wooster Pike (US-50) including a new access road, closing several driveways, and cul-de-sac'ing of intersecting streets. Improvements along Wooster Pike (US-50) will also include sidewalks, curb and gutter, medians, brick paved crosswalks, decorative lighting, landscaping, signing, and traffic signals. Utility relocation will also be required. Villag of Fairfax 116082~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 124392~|~1~|~1~|~01/IMS~|~Repair bridge carrying West St. over IR 70 for damage caused by over height vehicle strike. 112709~|~1~|~1~|~01/NHS~|~Replace culvert at MAD-38-11.71, MAD-40-5.92, and FAY-734-0.1 110217~|~2~|~2~|~02/MPO/LAFA~|~All the work designed with ALL Lafayette Sidewalks, PID 110216. Pedestrian facilities. Part of ADA plan. 100% federal funds using MPO-STP funds and Toll Revenue Credt until the cap is reached. Any funds needed over the cap are the responsibility of the Village of Lafayette. 110217~|~1~|~1~|~01/CMQ/BEAV~|~All work in this project. Pedestrian facilities at various location in the Village of Beaverdam. 100% MPO-CMAQ funds with Toll Revenue Credit (TRC) until the cap is reached. Funds needed after the cap is reached to be provided by the Village of Beaverdam. 92260~|~1~|~1~|~01/BRO~|~SFN 92260 Replacement of Rockhill Ave Bridge CR15 over mahoning river. 92260~|~1~|~2~|~02/ENH~|~Construction of eight foot shoulder for trail. 108476~|~1~|~1~|~01/NFA~|~FLAP Plan Split 108476~|~1~|~2~|~02/NFA~|~ODNR Segment of pavement 91050~|~1~|~1~|~01/SAE~|~100% Federal using HSIP funds to repair/replace guardrail. 123993~|~1~|~1~|~01/SAF~|~Hocking County Route Various Pavement Markings FY2026 123947~|~1~|~1~|~01/NFA~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 98727~|~1~|~1~|~01/BRO~|~BR funding for the I-71 structure at 90/10 fed/state. However the construction is funded with 100% state bond money. 98727~|~1~|~2~|~02/IMS~|~IM funding for the I-480 bridge at 90/10 fed/state. However the constuction is funded with 100% state bond money. 91445~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 233 5.95 (SFN 2703157). Rural other federal aid funded 80 federal/20 state. 112501~|~1~|~2~|~02/STR~|~AC overlay without repairs 112501~|~1~|~1~|~01/S5K~|~AC overlay without repairs 105258~|~1~|~1~|~01/STR~|~Resurfacing of BEL-145 100921~|~1~|~1~|~01/SAF~|~Work funded by the Central Office controlled safety program. 104165~|~1~|~1~|~01/NHS~|~Highway Lighting. 119025~|~1~|~1~|~01/STR~|~Plan split for bridge work. 93595~|~1~|~1~|~01/SAF~|~Improve intersection by widening for southbound dual left turns and a northbound right turn lane. 112476~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 105597~|~1~|~1~|~01/IMS~|~Deck Sealing 102726~|~1~|~1~|~01/IMS~|~Rehab of Interstate bridge. This work also includes an alternate bid for bridge aesthetics. 113765~|~1~|~1~|~01/BRF~|~All work in the project to replace the bridge. Funding will be 100% from the Municipal Bridge Program until the cap is reached after which the funding will be provided 100% by the Village of Carey. 86875~|~1~|~1~|~01/BRO~|~Rehabilitate existing culvert (HOL-62-1835, SFN 3801411) by lining with a liner. 113809~|~1~|~1~|~01/BRF~|~Replacement of SFN 3930610 97367~|~1~|~1~|~01/NFP~|~Resurface East 90th Street from Evarts Road to Buckeye Road in the City of Cleveland. 96804~|~1~|~1~|~01/NFA~|~BRO 221 6.80 Slide repair. 105564~|~1~|~1~|~01/S<2~|~Urbanized Area (Columbus) Plan Split: DEL-37-7.47-7.53, 8.36-8.51 & 8.62-8.66 FRA-315-13.56-3.80 105564~|~1~|~2~|~02/STR~|~Rural Plan Split: DEL-656-0.00-4.69 105564~|~1~|~3~|~03/IMS~|~Interstate Plan Split: FRA-70-11.21-11.98 & 13.43-13.95 FRA-270-40.45-41.40 105564~|~1~|~4~|~04/NHS~|~Priority System NHS Plan Split: FRA-23-0.24-0.51 & 1.50-1.95 FRA-104-8.18-8.79 105564~|~1~|~5~|~05/NHS~|~General System NHS Plan Split: FRA-33-12.08-12.61 FRA-62-3.85-5.63 FRA-317-10.06-10.70 105564~|~1~|~6~|~06/S<2~|~Urbanized Area (Darbydale) Plan Split: FRA-62-0.00-1.63 107469~|~1~|~1~|~01/CMQ~|~CMAQ funded Trail pslit 108381~|~1~|~1~|~01/NFA~|~Landslide repair project. VIN 328 6.20-6.24. 97577~|~1~|~1~|~01/S<2~|~Mill wheel rutting out of the pavement and resurface GAL CR 35 2.44-4.21. Project also includes increasing the pavement friction; installing edgelines, centerlines, and delineators; and upgrading the roadway signs. Urban other federal aid funded 80 federal/20 local. 123410~|~1~|~1~|~01/SAF~|~Safety and Speed Management Improvements 101693~|~1~|~1~|~01/S<2~|~STP 80/20 District Allocation/City of Bucyrus 101693~|~1~|~2~|~02/S<2~|~STP 100% City of Bucyrus 101693~|~1~|~3~|~03/S<2~|~STP 80/20 District Allocation 105693~|~1~|~1~|~01/STR~|~Apply herbicides along the roadside for weed control on 4 lanes. 103331~|~1~|~1~|~01/NHS~|~Mill and fill on NHS Route - Urban Paving. 118773~|~1~|~1~|~01/NHS~|~added plan split. 121845~|~1~|~1~|~01/MPO~|~resurfacing SR 835 from US 35 eastbound off ramp to US 35 flyover 105934~|~1~|~1~|~01/MPO~|~repair and resurface work eligible for federal-aid 99791~|~1~|~1~|~01/STR~|~Slide repair and lighting repair. 108772~|~1~|~1~|~01/S<2~|~All work in this project. 109966~|~1~|~1~|~01/BRF~|~Replacement of the superstructure of Bridge No CLI-CR 6-4.86 (SFN: 1430947). 103393~|~1~|~1~|~01/STR~|~Landslide repair. 87032~|~1~|~6~|~06/SAF~|~Add dilemma zone protection to 20 signalized high speed intersections. 87032~|~1~|~1~|~01/NHS~|~Install by contract traffic signals at various locations. This plan split will include BUT-SR-4 15.52 to 13.90 (PC - N P 16885) 87032~|~1~|~2~|~02/IMS~|~Install by contract traffic signals at various locations. Thsi plan split will include CLI-IR-71 2.90 to 3.00 (PS - I F 99999) 87032~|~1~|~5~|~05/S<2~|~Install by contract traffic signals at various locations. This plan split will include BUT-SR-73 18.08 to 18.09 (PC - O M 56926) 87032~|~1~|~3~|~03/STR~|~Install by contract traffic signals at various locations for FY2015-2016. This Plan Split is for the Rural Locations. This plan split includes BUT-SR-73 4.37 to 4.38 (PC - O M 99999) 87032~|~1~|~4~|~04/S>2~|~Install by contract traffic signals at various locations for FY2015-2016. This Plan Split is for the Urban Locations. This plan split includes BUT-SR-63 2.00 to 2.01 (PC - O C 16885) 107489~|~1~|~1~|~01/CMQ~|~CMAQ Plan split 107489~|~2~|~2~|~02/BRF~|~Structural replacement 107489~|~2~|~3~|~03/NFP~|~100% Local upgrades within bridge project. 114529~|~1~|~1~|~01/STR~|~Bridge replacement. 98575~|~1~|~2~|~02/NHS~|~100% Local (Vermilion): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): LOR-6-0.00 to 03.36 98575~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% (Vermilion) Urbanized Area Inside Corp. Limit (Paving Items): LOR-6-0.00 to 3.36.Priority 1 100% 4BG7 is for alternate bid pavement marking items if the city agrees to them. 107848~|~1~|~1~|~01/STR~|~Rural Plan Split: UNI-736-0.00-7.55 MAD-38-22.47-22.72 MAD-323-4.00-18.66 MAD-656-4.87-5.38 MRW-746-0.00-0.65 UNI-37-0.00-5.30 UNI-38-0.00-0.08 107848~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: UNI-736-7.55-7.91 107848~|~1~|~3~|~03/NFA~|~Rural (not on federal aid system): MRW-746-0.65-3.08 119340~|~1~|~1~|~01/IMS~|~Plan Split for Concrete Spot Repairs - locations still to be determined 112605~|~1~|~1~|~01/ENH~|~Adding sidewalks to TRU SR 45 from Bane St SW to 6th St SW in Warren Township. 88460~|~1~|~1~|~01/STR~|~improve intersection sight distance by eliminating guardrail, enclosing ditch at SEN CR592 2.77-2.78 and SEN SR12 3.97-3.98. 91462~|~1~|~1~|~01/STR~|~Rural resurfacing of FAY 435: 0-0.97 & 2.37-4.0801/STR/PV/ 99979~|~1~|~1~|~01/STR~|~Resufacing STA-US 62 from 0.93 to 3.96. 99979~|~1~|~2~|~02/STR~|~Minor Bridge work to SFN 7601891 STA-US 62-3.97 structure over Branch of Middle Fork 101282~|~1~|~1~|~01/STR~|~Resurfacing. 111540~|~1~|~1~|~01/NHS~|~1 3/4" mill and fill with superpave asphalt 99958~|~1~|~1~|~01/NFP~|~Road improvements to support new Fuyao Glass facility. 96994~|~1~|~1~|~01/STR~|~District wide herbicidal spray project 94749~|~1~|~1~|~01/SAF~|~Upgrade signals at the following locations: CLE-125-1.65 @ Brandychase; CLE-125-2.79 @ bennett; GRE-675-10.34 N. Fairfield & SB IR-675 entrance; HAM-71-11.81 Kennwood & NB IR-71 exit; HAM-128-5.67 @ Harrison; HAM-264-7.6 @ Virginia; HAM-27-11.43 @ Galbraith; HAM-27-11.63 @ Colerain Crossing/McDonalds; HAM-27-13.51 @ Springdale; WAR-22-5.37 @ SR-48 102303~|~1~|~1~|~01/IMS~|~This plan split is for steel superstructure painting and sealing necessary concrete surfaces on Interstate Bridges. 102303~|~1~|~2~|~02/NHS~|~This plan split is for steel superstructure painting and sealing necessary concrete surfaces on NHS Bridges. 102303~|~1~|~3~|~03/IMS~|~Work was performed on permanent item that was damaged by an accident 96126~|~1~|~1~|~01/NFA~|~Construct a new 6 bay, truck storage building at the ODOT Clark County Full Service Facility. 102272~|~1~|~1~|~01/SAF~|~Federal Safety eligible work items with a 90% federal and 10% local participation rate. 96234~|~1~|~1~|~01/STR~|~Place 3" of asphalt on SR 196 in Waynesfield. SR 196 4.150-4.410. 94785~|~1~|~1~|~01/TRN~|~Rehabilitate slow ordered rail, replacing 1,450 cross ties and furnish the needed ballast and rail anchors to complete the project. 94785~|~1~|~2~|~02/NFP~|~Funding event is for locally funded work. 114344~|~1~|~1~|~01/NFP~|~Scioto Trails State Forest maintenance project. 104985~|~1~|~1~|~01/NFP~|~Sign replacement along MAH IR-76 from SR 534 to I-80 and MAH IR-80 from IR-76 to Lipkey Rd. 109009~|~1~|~1~|~01/ENH~|~All work in this project. Funding is 95% federal funds through the use of Toll Revenue Credit (TRC). The match and any funds over the cap to be provided by the City of Findlay. 108696~|~1~|~1~|~01/BRF~|~Bridge replacement 95% Municipal Bridge (4R87)/5% City of Dover (LNTP). 117622~|~1~|~1~|~01/STR~|~Purchase Order to Repair the worst areas of the embankment slippage on the NW corner of the NS Railyard due to NS Railroad cutting out the toe of the embankment. 94081~|~1~|~5~|~05/S5K~|~Minor bridge work to the linked structures > 20' span. 94081~|~1~|~1~|~01/NHS/ASHT~|~Resurfacing, urban paving in the City of Ashtabula. 94081~|~1~|~3~|~03/S5K/ASHT~|~Resurfacing, urban paving in the City of Ashtabula. 94081~|~1~|~4~|~04/S5K/ASHT~|~100% city items including full and partial depth repairs and ADA curb ramps. 94081~|~1~|~2~|~02/NHS/ASHT~|~100% city items including full and partial depth repairs and ADA curb ramps. 80126~|~1~|~1~|~01/S<2~|~Bridge Replacement 100764~|~1~|~1~|~01/S>2~|~To plug existing drainage pipes and catch basins at SLM 3.65, SR4 in Hamilton County, at Ridgeway and Vine Street and install new pipe and catch basin above the old pipe that leads into the manhole at the center of the Vine Street and Ridgeway intersection 102760~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes 115484~|~1~|~1~|~01/S<2~|~All items associated with the removal and replacement of UNI-347-11.86 Culvert 119162~|~1~|~1~|~01/STR~|~Chip seal project. 113075~|~1~|~1~|~01/NHS~|~Crack seal on: LOG-33 SLM 1.97 to 15.50LOG-235 SLM 18.07 to 24.48LOG-708 SLM 0.00 to 1.00LOG-708 SLM 2.09 to 2.32LOG-706 SLM 0.00 to 2.29 100102~|~1~|~1~|~01/SAF~|~SRTS funded project 101397~|~1~|~1~|~01/BRO~|~Bridge 94545~|~2~|~2~|~02/ENH~|~Plan Split 2 is for CE at 100% Local (over fed max) 94545~|~1~|~1~|~01/ENH~|~Pedestrian Bridge 120434~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State 118189~|~1~|~1~|~01/SAF~|~Plan split for roundabout construction 103475~|~1~|~1~|~01/STR~|~D03 PR FY2020 2 year Contract 103475~|~1~|~2~|~02/NFP~|~D03 PRUNING 2 YR CONTRACT 123430~|~1~|~1~|~01/SAE~|~100% Safety-funded up to $2.5M in all phases 75946~|~1~|~1~|~01/NHS~|~Joint repair and diamond grinding on LOG US 33 from SLM 21.50 to 25.50 from the junction of SR 292 to the junction of SR 347. 89346~|~1~|~1~|~01/S<2~|~01/S<2/PV This Plan Split is for road reconstruction work eligible for federal funds from the small cities program. 89346~|~1~|~2~|~02/S<2~|~02/S<2/OT This Plan Split is for the 100% locally funded storm sewer work that is not eligible for federal funds. 122366~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction costs 104945~|~1~|~1~|~01/NHS~|~Bridge deck replacement project. WAS 7 52.80 (SFN 8400660). NHS route funded 80 federal/20 state. 119201~|~1~|~2~|~02/S>2~|~Urbanized area plan split for resurfacing of PIC-762-11.166-11.18. 119201~|~1~|~1~|~01/STR~|~Rural Plan split for resurfacing of PIC-762-8.85-11.166. 110455~|~1~|~1~|~01/NHS~|~Resurfacing US 22 99594~|~1~|~1~|~01/NFA~|~Resurfacing and improvements to Commonwealth Ave NE in Howland Township. 100012~|~1~|~1~|~01/MPO~|~Resurfacing Campbell from Marshall to Perkins Ave. 103068~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 160 14.53. DSR GAL-001. 107377~|~1~|~1~|~01/SAF~|~Guardrail repair/replacement on multiple County Roads with 100% CEAO Safety (4HB7). 84437~|~1~|~1~|~01/SAF~|~Extend southbound right turn lane to westbound IR275 on ramp. Begin at westbound IR275 ramps and end at Dry Ridge Connector, 0.24 miles. 95916~|~1~|~1~|~01/STR~|~Improve vertical alignment of SR 9 & SR 171. 101920~|~1~|~1~|~01/MPO~|~Resurfacing a county route. 102830~|~1~|~1~|~01/S>2~|~Plan Split 01 created for STP > 200000 routes within Columbus urban area 102830~|~1~|~3~|~03/STR~|~Plan Split 03 created for STP rural routes. 102830~|~1~|~2~|~02/NHS~|~Plan Split 02 created for NHS routes 99984~|~1~|~1~|~01/NFP~|~All cost are included in this plan split. 114679~|~1~|~1~|~01/STR~|~Replace Bridge size Culvert that carries SR 133 over Locust Creek 115671~|~1~|~1~|~01/IMS~|~Resurfacing. 112495~|~1~|~1~|~01/MPO~|~Split for MPO-funded work. 110993~|~1~|~1~|~01/SAF~|~Install a traffic signal with left turn lanes at the Hamilton Mason Rd and Mauds Hughes Rd intersection 81391~|~1~|~1~|~01/NHS~|~Bridge Repairs - NHS structures 81391~|~1~|~2~|~02/STR~|~Bridge Repairs 88455~|~1~|~1~|~01/SAE~|~Signal at Riverview and Scott intersection in Napoleon. 105238~|~1~|~1~|~01/STR~|~Resurfacing HAS-800 from Freeport to the Tuscarawas County Line and TUS-800 from the Harrison County Line to SLM 7.49. 105238~|~1~|~2~|~02/S<2~|~Resurfacing TUS-800 from SLM 7.49 to Dennison. 120115~|~1~|~1~|~01/MPO~|~Portion of work for MPO Funding 81147~|~1~|~2~|~02/IMS~|~LUC-475 from 0.21 to 4.71. 81147~|~1~|~1~|~01/IMS~|~for LUC-75 from SLM 1.99 to SLM 4.88 in Toledo. 100338~|~1~|~1~|~01/STR~|~This is a place holder Plan Splt created so funding can be entered. The project will been another Plan Split. Actual splits will be determined later. 116949~|~1~|~1~|~01/IMS~|~Items associated with roadway work and miscellaneous items 116949~|~1~|~2~|~02/IMS~|~All items associated with Bridge work 90437~|~1~|~1~|~01/S>2~|~Resurfacing of the existing roadway along with other roadway related items under the urban paving program on MOT SR 48 from 10.88 to 11.24. 90437~|~1~|~2~|~02/S>2~|~Resurfacing of the existing roadway along with other roadway related items under the urban paving program on MOT SR 835 from 0.610 to 1.27. 99586~|~1~|~1~|~01/SAF~|~Intersection improvement at North Road and North River Road, install northbound and southbound left turn lanes (North Road), adjust existing lane widths to meet current standards, add back plates to signals and adjust phases and timing, resurface intersection and update pavement markings. 106258~|~1~|~2~|~02/ENH~|~90% 4HJ7 and 10% Local 106258~|~1~|~1~|~01/SAF~|~Signal work. 100% 4HJ7 121042~|~1~|~1~|~01/NHS~|~Type 2 Emergency 109717~|~1~|~1~|~01/S>2~|~Microsurface 109717~|~1~|~2~|~02/STR~|~Microsurface 123191~|~1~|~1~|~01/STR~|~geotech plan split. 92118~|~1~|~1~|~01/IMS~|~resurface WOO IR75 19.91-26.06 109515~|~1~|~1~|~01/NFP~|~Plan split for salt storage 103806~|~1~|~1~|~01/NFA~|~The City will construct a 2 lane, 750 foot extension of Independence Parkway south from the current cul-de-sac. 107131~|~1~|~1~|~01/SAF~|~Construct roundabout at offset intersections of Socialville-Foster Rd and West Chester Rd with Butler-Warren Rd 76432~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PS7 (100% State) - No CAP - Resurfacing on LIC SR79 0-1.35 76432~|~1~|~4~|~04/S<2~|~"04/S<2/BR/ " - District Preservation 4PS7 (100% State) - No CAP - Water proofing and overlay maintenance work on SFN 2303469 FAI SR360 0.07 Intersect: South Fork Licking River - Not BR Eligible Length=97 - SD/FO(0) SR=100 DSR=6 76432~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PS7 (100% State) - No CAP - Resurfacing on LIC SR79 4.36-6.56 76432~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) LIC SR79 1.35-4.36; 2) FAI SR360 0-1.72; 3) LIC SR360 0-0.22; 4) SFN 4504666 LIC SR79 2.6 Intersect: SR 79 Over Ditch # 123475~|~1~|~1~|~01/MPO~|~Roadway reconstruction and pedestrian/bike facilities along E Cooke Rd from Glenmawr Ave to Karl Rd. 100913~|~1~|~1~|~01/STR~|~Overlay SR 501 in Auglaize County with asphalt concrete. AUG SR 501 SLM 3.54 to 7.59 100913~|~1~|~2~|~02/S<2~|~Overlay SR 501 in Auglaize County with asphalt concrete. AUG SR 501 SLM 3.04 to 3.54 116529~|~1~|~1~|~01/STR~|~Resurfacing. 96365~|~1~|~1~|~01/STR~|~SFN 4603826 LOG-540-0508 - Replace with 8' x 4' RCBCSFN 1103385 CHP-814-0025 - Replace with 2 - 48" RCP 13190~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all projects using federal NH funds. 4300424 109715~|~1~|~2~|~02/STR~|~AC Overlay without repairs on:AUG-65 SLM 7.32 to 10.60 109715~|~1~|~1~|~01/NHS~|~AC Overlay without repairs on:AUG-33 SLM 16.47 to 23.070 109715~|~3~|~3~|~03/NHS~|~Participation code added to project in the amount of $13,000 50% = State 50% = SAC 6FC7 4N40 106079~|~1~|~1~|~01/NHS~|~Resurfacing of SR 81 in the City of Lima from Jackson Street at 17.01 to the east corporation limits of the City of Lima at 18.17. The 80% federal funds will be from the District Preservation Program budget. The 20% non-federal match will be provided by the City of Lima. 106079~|~1~|~2~|~02/NFP/LIMA~|~Items paid 100% by the City of Lima such as curb ramps and aux. pavement parkings. 102892~|~1~|~1~|~01/SAE~|~Pavement markings on Ashland County roads within the Ashland Area 102892~|~1~|~2~|~02/SAE/ASD~|~Pavement marking on Rural Ashland County Roads 110174~|~1~|~1~|~01/IMS~|~This slide is located along the south side of IR 74 within a fill section just prior to the EB I-74 North Bend Rd exit ramp. Over saturated fill, in combination with a stream at the toe of the slope, resulted in failure to the embankment. 103454~|~1~|~1~|~01/MPO~|~Drainage system on CR 18. 107728~|~1~|~1~|~01/STR~|~All work in this project is in this plan split. Federal and state funds from the District Preservation Program budget. 84238~|~1~|~1~|~01/MPO~|~North Fairfield Road from NB IR 675 to on ramp from SB North Fairfield to IR 675. Construct a pedestran/cyclist bridge over IR 675 , located just west of North Fairfield Road to provide safe and convenient pedestrian access across IT 675 to Wright State University, nutter Center, shopping and offices. 113603~|~1~|~1~|~01/S>2~|~Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) 124221~|~1~|~1~|~01/NFP~|~Tree clearing 116266~|~1~|~1~|~01/MPO~|~Sidewalk and Crossing improvement at intersection of SR61 and Mary Fate Park Dr 116266~|~1~|~2~|~02/MPO~|~RCRPC funding (C227/RI03) for design consultant On-Going Services 100791~|~1~|~1~|~01/NFP~|~Construction of noise barrier. 113319~|~1~|~1~|~01/IMS~|~Split for noise barrier repair 101122~|~1~|~1~|~01/NHS~|~Signage replacement at various locations within Ottawa, Sandusky, and Seneca Counties. 92370~|~1~|~1~|~01/STR~|~Plan split for resurfacing of SAN-412 and SAN-590 98039~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-USR 62 and Kno-USR 62. 100997~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation Pavement Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Microsurfacing with related work on: 1) Lic-SR 13-13.97 to 22.52; 100997~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation Pavement Funding 4PF7 (Federal 80%) / 4PF7 (State 20%) - No CAP - Micro Surfacing on Gue-US 40-9.75 to 11.99. 100997~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation Paving - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Microsurfacing with related work on: 1)Gue-US 40-11.99 to 16.21, 2) Per-SR 13-19.88 to 26.88, 3) Per-SR 93-00.00 to 1.07, 4) Per-SR 93-03.90 to 11.58 109880~|~1~|~1~|~01/STR~|~2023 Operations Chip Seal 107239~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 669 11.25. Not on any federal aid system. GSM funded 100% state. 89260~|~1~|~1~|~01/NHS~|~80/20 funding split for work in the NHS section that is eligible for State STP funds: SLM 2.56 to SLM 3.07. 89260~|~1~|~2~|~02/NFP~|~Work not eligible for federal/state aid. 122853~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 112798~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-270-43.18-48.47 112798~|~2~|~2~|~02/IMS~|~Bridge Rehabilitation Work 112798~|~1~|~3~|~03/IMS~|~Costs to due to vehicle damage repairs 118192~|~1~|~1~|~01/SAF~|~Intersection and drive improvements at Busch Boulevard in Columbus 98394~|~1~|~1~|~01/NHS~|~LOR-18-0.00-13.96 Resurfacing 98394~|~1~|~2~|~02/NHS~|~bridge work to be determined later. 120549~|~1~|~1~|~01/BRO~|~Plan Split for Municipal Bridge Funding 96238~|~1~|~1~|~01/STR~|~Ros 772 11.85 Ros 772 13.23 97211~|~1~|~1~|~01/STR~|~Project cost for roadway, guardrail and drilled pier wall at this location. 88392~|~1~|~1~|~01/BRO~|~Replace existing structure carrying Mud Run (Length 88 ft) on SFN 1205730 CLA-SR-235 2.370 115280~|~1~|~1~|~01/S<2/MTVE~|~"01/S<2/OT/MTVE" - 95% Federal (4B37) and 5% Local (4BG7) - construction of share used path. 117943~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4. 121492~|~1~|~1~|~01/STR~|~Bridge replacement. 105088~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code. 94403~|~1~|~1~|~01/STR~|~Resurfacing 94403~|~1~|~3~|~03/STR~|~Bridge Work on Structures less than 20' 94403~|~1~|~2~|~02/STR~|~Bridge work for structures over 20' 87407~|~1~|~1~|~01/S>2~|~Widen SR-750 to five lanes from Wellington Blvd to Sawmill Parkway 122485~|~1~|~1~|~01/BRO~|~Bridge rehabilitation. 92871~|~1~|~1~|~01/BRF/PCEO~|~"01/BRF/BR/PCEO" ? County Engineer?s Association Organization (CEAO) Bridge Program 4B87 (Federal 80%) / 4BG7(State 20%) ? CEAO CAP of $422,180.00 for Construction Phase ? Credit Bridge CAP of $66,600.00 - Bridge replacement of SFN #6430007 PER TR79 00.02 Intersect: Thornport Canal: BR Eligible for Replacement Length=34' SD/FO(1) SR=41.0 DSR=7 90387~|~1~|~1~|~01/CMQ~|~MORPC CMAQ for signalization at 12 intersections on Broad St and Main St.Local Sponsor - City of Bexley 125004~|~1~|~1~|~01/ENH~|~MPO TAP funds 87193~|~1~|~1~|~01/NHS~|~Priority System - Minor Rehab on BEL-7-14.08 to 17.74; includes asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, pavement marking 118705~|~1~|~1~|~01/STR~|~Superstructure replacement. 105790~|~1~|~1~|~01/BRO~|~Split for bridge rehab work 88982~|~1~|~2~|~02/STR~|~BRO US68, 31.28 - 41.08 Resurfacing ProjectBrdgs F/Rehab:0801836 BRO US68 35.54 Intersect: Fivemile Creek0801887 BRO US68 40.91 Intersect: Trib E.Fork Little Miami0801984 BRO US68 40.16 Intersect: Little Indian Creek80/20 split02/STR/BR/State 88982~|~1~|~1~|~01/STR~|~BRO US68 31.28 - 41.08 Resurfacing ProjectOn US68, within the Mt. Orab corp at the joint (SLM 31.28) head north for 9.8 miles and terminate within the Fayetteville corp at US50 (SLM 41.08), it is proposed to resurface the asphalt roadway.Pave Thru Brdgs:0801801 BRO US68 32.390801860 BRO US68 36.6 Intersect: East Fork Five Mile Creek0801925 BRO US68 39.89 Intersect: Indian Creek80/20 split01/STR/PV/State 83456~|~1~|~1~|~01/MPO~|~Pavement widening 83456~|~1~|~2~|~02/MPO~|~100% local items. 22655~|~1~|~1~|~01/NHS~|~Resurfacing COS 36 103879~|~1~|~1~|~01/IMS~|~Plan split 101256~|~1~|~1~|~01/IMS~|~Split for resurfacing work 121005~|~1~|~1~|~01/S>2~|~Plan Split for the 80/20 - ODOT/City items 121005~|~1~|~2~|~02/S>2/CINC~|~Plan split for the 100% City items 82033~|~1~|~2~|~02/S<2~|~01/S<2/PV/ Work outside the City of Upper Sandusky but inside the Upper Sandusky Urban Area. All funds are from the District Presevation Program budget. No local funds. SR 53 from 11.63 to 11.65 on the right side. SR 53 from 13.97 to 14.44 on the right side and starting at 13.99 on the left side. 82033~|~1~|~1~|~01/S<2/USAN~|~01/S<2/PV/USAN Resurfacing work inside the City of Upper Sandusky. Funding is 80% federal STP funds provided by the District and a 20% match provided by the City of Upper Sandusky. SR 53 entered the City of Upper Sandusky at 11.63 on the left side and 11.65 on the right side. SR 53 leaves the City of Upper Sandusky at 13.97 on the right side and 13.99 on the left side then re-enters the City at 14.44 on the right side and remains in the City on the right side until 15.32. 82033~|~1~|~3~|~03/NFP/USAN~|~Curb ramps and auxilary pavement markings that will be paid 100% by the City of Upper Sandusky. 104186~|~1~|~1~|~01/NHS~|~Slide Repair 100471~|~1~|~2~|~02/NHS/AQUA~|~Replacement of Aqua Ohio waterline through project limits. 100471~|~1~|~1~|~01/NHS~|~Widen (for Two Way Left Turn Lane) and resurface SR 241 from Lincoln Way to Taggart Street includes full and partial depth repairs and pavement planning. Upgrade signals with fiber interconnect at 4 intersections. Includes replacing sidewalk, concrete and asphalt drives, catch basins, sanitary sewer, and replacing curbs with curb and gutter. In the City of Massillon. 100471~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 116964~|~1~|~1~|~01/S>2~|~Resurfacing 98215~|~1~|~1~|~01/NFP~|~Electrical maintenance throughout the District 117938~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 110499~|~1~|~1~|~01/STR~|~Resurfacing HAS-9, JEF-43, JEF-150 and JEF-152 108613~|~1~|~1~|~01/BRO~|~Bridge replacement project. HOC 180 5.37, SFN 3702944. Bridge on system eligible funded 80 federal/20 state. 88844~|~1~|~2~|~02/STR~|~Culvert Replacement: ASD-96-2.35 88844~|~1~|~1~|~01/STR~|~Bridge Replacement: ASD-96-2.56 103788~|~1~|~1~|~01/STR~|~Landslide repair. MRG 792 5.11. DSR MRG-003. 115471~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ - 100% state funded (4BF7) by ODNR 123692~|~1~|~1~|~01/MPO/STCE~|~Resurfacing. 77719~|~1~|~1~|~01/NHS~|~Preventive Maint. project using an AC inlay treatment. ATH 50 4.99-9.18 (City of Athens). NHS route funded 80 federal/20 state. 115611~|~1~|~1~|~01/ENH~|~Streetscape and sidewalk improvements in the Village of Gnadenhutten utilizing Federal Carbon Reduction and Safety funds and State SIB funds up to respective funding caps. 98679~|~1~|~1~|~01/NHS~|~90% federal - 10% local participation on eligible work items for the widening of US-20 to accomodate a center 2-way left-turn lane between SR-615 and Murray Street. 116700~|~1~|~1~|~01/STR~|~For resurfacing on SR 231 in Wyandot County from SLM 3.03 to 10.34. District Preservation Funds. 111029~|~1~|~1~|~01/SAF~|~Repair landslide along Columbia Parkway. 94042~|~1~|~1~|~01/NFP~|~Environmental remediation at Rootstown county garage site in Portage County, Ohio. 121053~|~1~|~1~|~01/STR~|~Landslide repair. 89001~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill 115277~|~1~|~1~|~01/CMQ/CIN~|~Installation of fiber optic interconnect cable, upgrades to existing traffic signals with LED technology, new traffic signal controllers, video detection, and traffic cameras. In the OTR and West End neighborhoods of Cincinnati. 115277~|~1~|~2~|~02/CMQ~|~ Installation of new traffic signal controllers, video detection, and traffic cameras at non warranted locations. 104276~|~1~|~1~|~01/MPO~|~Plan Split 101257~|~1~|~1~|~01/IMS~|~Microsurfacing of IR-480 between SLM 0.00 and SLM 8.67, in Summit County, Ohio. 119173~|~1~|~1~|~01/SAF/CCEO~|~Reconstruction of Osborn Road from Dalton Road for 0.8 miles. Improvements to vertical and horizontal alignment, widening of pavement and shoulders, removal of fixed objects from the clear zone. 89417~|~1~|~2~|~02/NFP/PORT~|~This is for the water works. 89417~|~1~|~1~|~01/S<2~|~A Small City funded project to reconstruct and widen OTT CR501 0.39-1.04 98475~|~1~|~5~|~05/IMS~|~Minor bridge work to the linked structures > 20' span. 98475~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing SUM SR 18 from 13.41 to 14.56. 98475~|~1~|~3~|~03/S>2/AKRO~|~Resurfacing SUM SR 241 from 10.41 to 11.21Resurfacing SUM SR 261 from 5.70 to 6.05 and 8.11 to 8.91. 98475~|~1~|~6~|~06/S>2~|~Minor bridge work to the linked structures > 20' span. 98475~|~1~|~2~|~02/NHS/AKRO~|~100% Akron items for partial depth repairs and curb ramps on SUM SR 18. 98475~|~1~|~4~|~04/S>2/AKRO~|~100% Akron items for partial depth repairs and curb ramps on SUM SR 241. 108946~|~1~|~1~|~01/SAF~|~Work funded by the Safe Routes to School program. Funded needed over the cap to be provided by the Village of Payne. The Safe Routes to School funds will be used at a 100% rate with the use of Toll Revenue Credit. 89104~|~1~|~1~|~01/BRF~|~Municipal bridge funding to replace SFN 2567652, Elm St bridge, over Mason Run 107998~|~1~|~1~|~01/NFP~|~Guardrail Contract. 107998~|~1~|~2~|~02/SAF~|~Box Beam GR change order 107998~|~1~|~3~|~03/SAE~|~Truss and Sign removal. 114522~|~1~|~1~|~01/BRO~|~Split for bridge work 109716~|~1~|~1~|~01/STR~|~AC Overlay without repairs 109716~|~1~|~2~|~02/S<2~|~AC Overlay without repairs 90765~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 102805~|~1~|~1~|~01/S<2~|~Federal and State funds from the ODOT Central Office Geologic Site Management (GSM) program. Any amount of the GSM cap will be covered fro the district preservation program budget. GSM funds are to be used first. 91401~|~1~|~2~|~02/S<2~|~PIC 22 SLM 18.95-20.65 General system paving but in the urban func class area 91401~|~1~|~4~|~04/STR~|~STP Rural bridge replace Non-BR eligible 100% state PIC-22-21.99 over County Home Ditch 91401~|~1~|~1~|~01/S<2~|~PIC-22 SLM 17.34-18.95, Circleville urban paving and in urban func class area 91401~|~1~|~3~|~03/STR~|~PIC-22 SLM 20.65-23.96 General system paving and in the rural func class area 124490~|~1~|~1~|~01/IMS~|~All construction on IR 71 76358~|~1~|~2~|~02/NHS~|~Minor bridge work on 14 structures (not BR eligible):8000670 UNI US33 0.37 Intersect: Flat Branch8000689 UNI US33 0.37 Intersect: Flat Branch8000778 UNI US33 3.4 Intersect: Buck Run8000808 UNI US33 4.12 Intersect: North Branch Buck Run8000883 UNI US33 4.28 Intersect: Over Bear Swamp Road-C1498000891 UNI US33 4.28 Intersect: Over Bear Swamp Road-C1498000921 UNI US33 4.95 Intersect: East Branch Buck Run8001006 UNI US33 5.93 Intersect: Over Paver-Barnes Rd-C1348001014 UNI US33 5.93 Intersect: Over Paver-Barnes Rd-C1348001065 UNI US33 7.85 Intersect: Over Sr2458001073 UNI US33 7.85 Intersect: Over Sr2458001219 UNI US33 8.34 Intersect: Us36 And Sr 4 Ramp8001227 UNI US33 8.35 Intersect: Us36 And Sr 4 Ramp8001243 UNI US33 8.56 Intersect: Ramp Over Sr245 76358~|~1~|~1~|~01/NHS~|~Resurfacing of UNI-33 from 0.00-8.74 84403~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 119280~|~1~|~1~|~01/S>2~|~Replace structure over Noble Run/Store 87003~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. MEG 124 42.00-45.73 and MEG 681 5.05-9.25. Rural other federal aid funded 80 federal/20 state. 95432~|~1~|~1~|~01/NFA~|~Salt Shed at Jackson County Garage 95628~|~1~|~2~|~02/SAF/COL~|~Resurfacing of Sawmill from IR 270 bridge to Billingsley Rd, portion with 100% Columbus funding 95628~|~1~|~1~|~01/SAF~|~Safety funding to add NB outside lane from I-270 to Hard Rd 95628~|~1~|~3~|~03/SAF/DUB~|~Resurfacing of Sawmill from IR 270 bridge to Billingsley Rd, portion with 100% Dublin funding 101008~|~1~|~3~|~03/STR~|~Resurfacing and related preventative maintenance work on bridges in rural (STR) portion. 101008~|~1~|~2~|~02/S5K~|~Resurfacing and related roadway work in Sk5 section. 101008~|~1~|~1~|~01/NHS~|~Resurfacing and related roadway items on MUS/COS-16 109622~|~1~|~1~|~01/BRF/YOUN~|~Demolition of structure over abandoned railroad. 109622~|~1~|~2~|~02/NFA/YOUN~|~Bridge ineligible items. 105194~|~1~|~1~|~01/NHS~|~plan split for roadway work on the NHS portion:WAR-122 SLM 6.20 to 7.14WAR-122 SLM 7.14 to 7.40 105194~|~1~|~2~|~02/S>2~|~plan split for roadway work on the large urban portion:WAR-48 SLM 0.30 to 1.64WAR-48 SLM 4.64 to 4.84WAR-48 SLM 4.84 to 5.23WAR-48 SLM 16.73 to 18.30WAR-48 SLM 18.30 to 19.54WAR-48 SLM 19.54 to 23.08 105194~|~1~|~3~|~03/STR~|~plan split for roadway work on Rural portion:WAR-122 SLM 5.15 to 6.20WAR-48 SLM 1.64 to 4.64 105194~|~1~|~4~|~04/SAF~|~Centerline rumble stripes. 108697~|~1~|~1~|~01/IMS~|~Concrete pavement repair. NOB IR 0.00-11.19 and WAS IR 77 6.63-17.64. Interstate route funded 90 federal/10 state. 105283~|~1~|~1~|~01/NHS~|~Plan split for the NHS section: CLE-32 105283~|~1~|~2~|~02/S>2~|~plan split for the large urban (non-NHS) segment of CLE-32 93939~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2018. Various routes and sections in D10. Funded 100% state. 113811~|~1~|~1~|~01/BRF~|~Replacement of SFN 3934772 92229~|~1~|~1~|~01/IMS~|~100% state fund code for all work 106339~|~1~|~1~|~01/SAF~|~CR 10 3.15 - 3.45 realign horizontal curve on CR 10 as well as to widen the pavement and berms. 113511~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for upgrading guardrail on county roads 95590~|~1~|~1~|~01/CMQ~|~Bike/Hike path. CMAQ and STP funds from the Lima-Allen County Regional Planning Commission. The CMAQ funds will be used before the STP funds. The CMAQ eligibility was approved in an April 14, 2014 letter. 120693~|~1~|~1~|~01/STR~|~All roundabout construction work included in this split. 116831~|~1~|~1~|~01/IMS~|~Split for bridge deck replacement 100779~|~1~|~3~|~03/NHS~|~Bridge 8601127 100779~|~1~|~2~|~02/NHS~|~US-20 Resurf from SLM 14.33 to 20.20 100779~|~1~|~4~|~04/STR~|~split for bridge SFN 8601097 100779~|~1~|~1~|~01/STR~|~US20 from SLM 12.03 to SLM 14.33 109821~|~1~|~1~|~01/SAE~|~Guardrail installation and upgrades on various county roads in Clinton County. 106469~|~1~|~1~|~01/S>2~|~Sockline CIPP storm sewer HAM-128-0562 106469~|~1~|~2~|~02/STR~|~Sockline or Slip line small culvert CLE-133-0309 106469~|~1~|~3~|~03/NHS~|~Sockline or slip line small culvert CLE-52-0236 - HAM-50-0278. 110665~|~1~|~1~|~01/S>2~|~Resurfacing. 81689~|~2~|~2~|~02/NFA~|~General System asphalt resufacing on JEF-524-0.00 to 0.26; includes pavement repairs, pavement marking 81689~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on HAS-151-11.12 to 12.90, JEF-43-20.98 to 21.71, and JEF-164-1.06 to 6.19; includes pavement repairs, pavement marking 109568~|~1~|~1~|~01/STR~|~Resurfacing CR5 from 0.00-11.605 109568~|~1~|~3~|~03/S5K~|~Resurfacing CR 25 from 0.00 - 0.572 109568~|~1~|~2~|~02/NFA~|~Resurfacing CR25 from 0.572-10.44 78152~|~1~|~1~|~01/IMS~|~Interstate pavement resurfacing I-71 NB ramp at Gemini signs & pvmt markingsSeal median barriernoise wall panels 78152~|~1~|~2~|~02/IMS~|~Minor bridge workSFN 2508354, FRA-71-29.25 under Park RdSFN 2508419, FRA-71-29.83 over Worthington GalenaSFN 2102277, DEL-750-8.93 under Polaris PkwySFN 2102293, DEL-71-0.91 under Gemini Pkwy 78152~|~2~|~3~|~03/IMS~|~Part 2 Interstate. 90/10 Fed/State: FRA-71-18.52 to 19.09 107879~|~1~|~1~|~01/STR~|~All work in this project. Funds from the District Preservation Program budget. 123285~|~1~|~1~|~01/SAF/HOL~|~Pavement marking project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%. 105138~|~1~|~1~|~01/STR~|~plan split for the pavement work in the rural sections:CLE-131: SLM 8.51-11.98 105138~|~1~|~2~|~02/S>2~|~plan split for the pavement work in the large urban section:CLE-50: SLM 2.21-2.26CLE 50: SLM 2.30 -2.87CLE 50: SLM 2.87-3.49CLE-50: SLM 3.49 - 4.60 95236~|~1~|~1~|~01/IMS~|~Four lane mowing in multiple districts on the interstate. 105126~|~1~|~1~|~01/S<2~|~Culvert Replacements 115478~|~1~|~1~|~01/NFP~|~Resurfacing parking lot and access road in the TRU Mosquito Creek Lake Wildlife Area. 100561~|~1~|~1~|~01/IMS~|~Plan split for all roadway and pavement work within the project on CLI IR 71 and GRE IR 71 86652~|~1~|~3~|~03/NHS~|~Asphalt overlay on structure:2504596 FRA IR70 17.47 Intersect: S 3Rd St(Us-33) Over I-7003/NHS/BR/ 86652~|~1~|~2~|~02/S>2~|~Columbus urban pavement workFRA-33: SLM 17.59-20.69 (Livingston from 4th to College)02/S>2/PV/ 86652~|~1~|~1~|~01/NHS~|~Columbus urban pavement workFRA-33: SLM 17.45-17.52 (Third St from Fulton to Livingston)FRA-23: SLM 10.65-10.72 (Livingston from 3rd to 4th)01/NHS/PV/ 86652~|~1~|~4~|~04/S>2~|~Deck patching and sealing on structure:2501635 FRA US33 20.4 Intersect: Alum Creek04/S>2/BR/ 98649~|~1~|~1~|~01/IMS~|~3 bridges 104265~|~1~|~1~|~01/SAE~|~Upgrading guardrail and end terminals on various county routes throughout Trumbull County. 90879~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/OT/CAMB" - City of Cambridge SRTS project funding 4SC7 (100 Federal) - CAP $190,000.00 for sidewalk, curb ramps, school zone flashers and pavement marking. 122873~|~1~|~1~|~01/NFP~|~All work included in this split. 112198~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4. 118438~|~1~|~1~|~01/STR~|~Rehabilitation of MUS SR 83 14.30 111651~|~1~|~1~|~01/S>2~|~Repair existing Clermont County roads by repairing failed areas, pre-leveling, berm repairs and resurfacing. Final pavement striping and RPMS will also be included. Micro-surfacing will also be performed in several areas with high accidents. 95923~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State - No CAP- Resurfacing with related work on Per-US 22-6.77 to 14.27 101975~|~1~|~1~|~01/STR~|~Federal STP funds from CEAO. 80% federal with the 20% match provided by Putnam County. Funds needed over the cap provided 100% by Putnam County. 102766~|~1~|~1~|~01/STR~|~This plan split is for work on rural bridge. 105292~|~1~|~1~|~01/STR~|~Resurfacing of TUS-258 114515~|~1~|~1~|~01/NHS~|~Work on the HAM-50-0376L Bridge that carries US 50 over the Great Miami River and HAM-50-1903L Bridge that carries US 50 over the Mill Creek and a railroad. O 114515~|~1~|~2~|~02/NHS~|~All work associated to the HAM-50-0376R (eastbound) bridge over the Great Miami River. This bridge is a District funded bridge and is therefore a separate funding event from the left bridge. 110506~|~1~|~1~|~01/MPO~|~Mill and resurfacing with full depth repairs where necessary on N. Detroit Street from Church Street to Kinsey Road. 88808~|~1~|~3~|~03/STR~|~Bridge Work for SFN 7004885 RIC-95-0.89 (Bridge under 20 ft) 88808~|~1~|~2~|~02/BRO~|~Bridge Work 88808~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 108370~|~1~|~1~|~01/MPO/BARB~|~Concrete pavement rehabilitation on State Street and Wooster Rd in the City of Barberton. 108370~|~1~|~2~|~02/S>2/BARB~|~Waterline relocation. 108370~|~2~|~3~|~03/SAF/BARB~|~Extend Holmes Ave from 3rd St to Wunderlich Ave in the City of Barberton. 91550~|~1~|~1~|~01/IMS~|~Remove and rreplace the existing reinforced concrete deck on bridge (BEL-70-1223, SFN 0702315). Repair substructure units as needed and paint structural steel. Provide new approach slabs. 103645~|~1~|~1~|~01/S<2~|~DSR BEL-018 124565~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded scope to connect North Coast Inland Trail sections in Clyde 121630~|~1~|~1~|~01/NHS~|~NHS pedestrian improvements 121630~|~1~|~2~|~02/S>2~|~STP pedestrian improvements 115717~|~1~|~1~|~01/IMS~|~Replacement of existing pavement and miscellaneous items (69%) 115717~|~1~|~2~|~02/IMS~|~Pavement and Misc Items associated with Pavement widening (31%) 115717~|~1~|~3~|~03/IMS~|~Item associated with the removal and replacement of existing bridges (69%) 115717~|~1~|~4~|~04/IMS~|~Items associated with widening of bridges (31%) 115717~|~1~|~5~|~05/IMS~|~Items associated with Bridge Rehab on SFN 4903218 (MAD-71-4.708) 97021~|~1~|~1~|~01/SAE~|~Guardrail repair/replacement on various County routes in Mahoning County, Ohio. 105867~|~1~|~1~|~01/IMS~|~Added CO CO Engr 01 122226~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR80-H 112594~|~1~|~1~|~01/IMS~|~Interstate plan split: DEL-71-1.60-11.55 119186~|~1~|~1~|~01/BRO~|~Plan split for WOO-281-0666 bridge 117526~|~1~|~1~|~01/IMS~|~Plan Split for the Pump Station and CSO work. 88913~|~1~|~1~|~01/IMS~|~Replace existing bridge (BEL-70-1843, SFN 0702706) with a new steel beam bridge. Provide new full width approach slabs. 87610~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Annual contract for placement of Fast Dry Striping within District 5 on IR; US; and SR 118470~|~1~|~1~|~01/S5K~|~Large City Funding for FY2024 105814~|~1~|~1~|~01/IMS~|~Split for bridge painting work 97478~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - Lic-TR 303-02.87 (Licking Trail Road) SFN 4537009 - BR Eligible for replacement: L=51'; SD/FO=1; SR=35.9; DSR=4; 121438~|~1~|~1~|~01/SAF~|~D10 RPM FY2030 93652~|~1~|~1~|~01/STR~|~From the Defiance Urban Area boundary at 9.08 to the end of the project at the county line. State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 93652~|~1~|~2~|~02/S<2~|~From the beginning of the project at Jewell Road to the Defiance Urban Area boundary at 9.08. State and federal funds from the District Preservation Program budget. No local funds. Urban STP funds. Although, this work is inside the Defaince Urban Area, it is outside of the City of Defiance. 89258~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for urban paving funds 89258~|~1~|~2~|~02/NFP~|~Split 2 for items of work not eligible for urban paving funds paid at 100% local cost 112652~|~1~|~1~|~01/MPO~|~Resurfacing North River Rd from Leavitt Rd to Elm Rd. 80526~|~1~|~1~|~01/ERD~|~Improvement of Sarah Street in the Cty of Tiffin (Heidelberg Univ). 117682~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds 103957~|~2~|~2~|~02/NHS~|~This plan split covers all work associated with PID 103958 103957~|~1~|~1~|~01/NHS~|~WB CLE 32 exit ramp to CLE CR 55. 122947~|~1~|~1~|~01/IMS~|~Crack and seat existing concrete pavement and pave over with asphalt overlay. 114482~|~1~|~1~|~01/NHS~|~Funding split for TSMO improvements 121335~|~1~|~1~|~01/STR~|~STP Plan split. 90432~|~1~|~1~|~01/NHS~|~Bridge replacement project. WAS 7 3457 (SFN 8402345). NHS route funded 80 federal/20 state. 111341~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail 111341~|~1~|~2~|~02/SAF~|~Plan split for ODOT Safety program funded run of guardrail 100504~|~1~|~1~|~01/STR~|~HIG 62 (10.38-12.26) 100504~|~1~|~2~|~02/S<2~|~HIG 62 (12.26-13.32) 100504~|~1~|~3~|~03/S<2~|~Bridge PM. 100504~|~1~|~4~|~04/SAF~|~Safety funded centerline rumble stripe. 98196~|~1~|~1~|~01/NFP~|~District Preservation Program - 4PS7 (100% State) - No CAP - Routes in Coshocton, Muskingum and Guernsey Counties 118791~|~1~|~1~|~01/IMS~|~Smoothseal MED-71-15.790 to 26.687Bridge maintenance work included with project 94289~|~1~|~1~|~01/BRF~|~Improvements to Bridge No. BUT-TR 134-7.36 which carries Yankee Road over Dick's Creek. SFN 0930946 103824~|~1~|~1~|~01/STR~|~Bridge repair on rural routes. 103824~|~1~|~2~|~02/IMS~|~Bridge repair on Interstate bridges. 116824~|~1~|~1~|~01/NHS~|~Resurfacing. 98647~|~1~|~1~|~01/SAF~|~Pavement markings 104635~|~1~|~1~|~01/MPO~|~Resurfacing State St from SR 45 to SR 305 in Champion Township. 105569~|~1~|~1~|~01/NHS~|~Bridge Repair. 120366~|~1~|~1~|~01/NFA~|~NOB-CR-62-0.80 SFN:6136151 114938~|~1~|~2~|~02/NHS~|~Replace and repair broken noise wall panels on various NHS routes 114938~|~1~|~1~|~01/IMS~|~Replace and repair broken noise wall panels on various Interstate routes 111362~|~1~|~1~|~01/NFP~|~Construction of new Akron Outpost. 100370~|~1~|~1~|~01/IMS~|~Crack sealing, minor pavement and bridge repairs. 100370~|~1~|~2~|~02/IMS~|~Perform maintenance activities on mainline structures. 101493~|~1~|~1~|~01/STR~|~DSR# BEL-002 113464~|~1~|~1~|~01/IMS~|~Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction of a wall or regrading of the channel. 123553~|~1~|~1~|~01/NFP~|~HS 2031 118912~|~1~|~1~|~01/STR~|~Crack sealing 110063~|~1~|~1~|~01/S<2~|~Landslide repair project. GAL 588 11.00. 100% State ER funded. 87253~|~1~|~1~|~01/STR~|~US68, 41.08 - 45.88 Resurfacing Project It is proposed to resurface the highway with asphalt concrete. On US68, begin at the south corp limit of Fayetteville north thru the village and terminate at the Clinton County line.Pave thru brdgs on US68:0802018 41.42 Intersect: Solomon Run 0802077 45.08 Intersect: Trib W Fork 80/20 split 87253~|~1~|~4~|~04/NHS~|~BRO US 52 4.25 - 10.50 Resurfacing ProjectBrdgs for Rehab on US52:0800813 5.52 Intersect: White Oak Creek 0800856 BRO US52 7.82 Intersect: Straight Creek 80/20 split 87253~|~1~|~3~|~03/NHS~|~BRO US52, 4.25 - 10.50 Resurfacing Project It is proposed to resurface the highway with asphalt concrete. On US52, begin at the west corp limit east thru Higginsport and terminate 0.85 mile east of TR255 (Pisgah Hill Road). Pave thru brdgs on US52:0800783 4.41 Intersect: Hog Run 0800880 9.32 Intersect: Trib Of Ohio River 0800902 9.72 Intersect: Levanna Branch Stream 0800937 9.99 Intersect: Kope Hollow Stream 0800961 10.41 Intersect: Tributary Of Ohio River 80/20 split 87253~|~1~|~2~|~02/STR~|~US68 41.08 - 45.88 Resurfacing ProjectBrdgs for Rehab on US68:0802042 44.12 Intersect: E Fork Little Miami River 80/20 split 115574~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 86699~|~1~|~2~|~02/NFA~|~Not on any Fed Aid System: ASD 179 0.00-9.72 86699~|~1~|~1~|~01/STR~|~STP Rural: ASD 604 0.00-3.38 / ASD 89 0.00-4.68 and 5.40-12.03 112976~|~1~|~1~|~01/NHS~|~Repair bridge size twin culvert BUT-4-0930 over Shaffer Creek 112976~|~1~|~2~|~02/STR~|~All costs associated with the repairs to bridge size culvert BUT-129-0230 93960~|~1~|~3~|~03/NFP~|~Urban Paving Ineligible items. 93960~|~1~|~2~|~02/NHS~|~For piece between SLM 24.79 and SLM 25.07 (end of project). 93960~|~1~|~1~|~01/S>2~|~Urban Paving eligible items from SLM 20.65 to SLM 24.79 95089~|~1~|~1~|~01/S<2~|~Extend East Pine St from SR 57 to Walnut St and from the east end of Pine St to the east end of Chestnut St across the JGL parking area 114707~|~1~|~1~|~01/IMS~|~Bridge replacement of LUC-475-11.38/12.38 120755~|~1~|~1~|~01/NHS~|~Federally eligible resurfacing work utilizing STBG funding from the MPO. 121459~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 102915~|~1~|~1~|~01/SAF~|~Safety improvements on Fitchville River Road. 105322~|~1~|~6~|~06/IMS~|~Project eligible utility items: waterworks, sanitary, electric, traffic surveillance 105322~|~1~|~5~|~05/NHS~|~new bridges FRA-70-1461P, FRA-70-1476, FRA-70-1498, and walls I-7, I-13A 105322~|~1~|~7~|~07/MPO/Cols~|~MORPC/Columbus funded enhancements 105322~|~1~|~2~|~02/NHS~|~IR 70 widened pavement (45%) structure FRA-33-1747; SFN 2504596 (45%), and walls I-8A, I-9A-1, I-9-A2, I11, I-13-2, I-13D, and I13T (45%) 105322~|~1~|~1~|~01/IMS~|~IR 70 existing pavement reconstruction (55%) Parsons Ave, Childrens Dr, Mooberry St. (100%), structure FRA-33-1747; (Existing SFN 2504596)(55%), and walls I-8A, I-9A-1, I-9-A2, I11, I-13-2, I-13D, and I13T (55%) 105322~|~1~|~3~|~03/IMS~|~bridge replacements - existing width FRA-1493 L&R (existing SFN's 2504774 & 2504804)(2/3), walls I-13B, I-13E (2/3) 105322~|~1~|~4~|~04/NHS~|~bridge replacements - widening FRA-70-1493 R (existing SFN 2504804) (2/3) and walls I-13B, I-13E (1/3) 105322~|~1~|~10~|~10/NHS~|~ITS funded items 105322~|~1~|~8~|~08/S>2/Cols~|~100% City of Columbus items (brick crosswalks) 105322~|~1~|~9~|~09/ENH/Cols~|~Incremental items (brick sidewalks, granite curbs) - Columbus to pay costs above standard items 105322~|~1~|~11~|~11/SAF~|~Repair of damage caused by vehicle accidents 119046~|~1~|~1~|~01/S>2~|~Columbus urban area plan split for culvert/storm sewer upgrades on FRA-3. 112923~|~1~|~1~|~01/SAF~|~Signal replacement project on HOC 664 15.85 and install a right turn lane on Chieftain Drive in the City of Logan. Safety Funded 90% Federal/10% State. 112923~|~1~|~2~|~02/SAF~|~Signal replacement project at HOC 664 15.65-15.75 and Old McArthur Road intersection. Work includes upgraded signal heads and upgraded detection. Safety Funded 100% Federal. 119873~|~1~|~1~|~01/BRF~|~Plan split for bridge replacement work. 106305~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4. 118836~|~1~|~1~|~01/S5K~|~Resurfacing project. 102443~|~1~|~1~|~01/STR~|~Herbicidal Spraying in BEL, HAS, and JEF 105922~|~1~|~1~|~01/SAE/FCEO~|~"01/SAE/OT/FCEO" - Fairfield County funded CEAO guardrail project with federal max of $200,000 84156~|~1~|~1~|~01/MPO~|~Replace traffic signal system on Central Avenue and Dixie Drive from Miami Avenue through Alex-Bell Road. 106038~|~1~|~1~|~01/STR~|~Rural Plan Split 106765~|~1~|~1~|~01/NFP~|~All work is included in this plan split using SAC 4SR7 funds. 114308~|~1~|~1~|~01/IMS~|~For culvert work on the Interstate locations. 114308~|~1~|~2~|~02/NHS~|~For conduit work on the NHS locations. 114308~|~1~|~3~|~03/S5K~|~For conduit work on the rural highway with 5K to 50K population. 114308~|~1~|~4~|~04/STR~|~For conduit work on the rural highway with <5K population. 114308~|~1~|~5~|~05/NFP~|~For conduit work on the Non-Federal Aid locations. 101468~|~1~|~1~|~01/STR~|~Pavement Markings 89285~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No CAP - Fai-SR 159-00.00 to the 10.57 82963~|~1~|~2~|~02/NHS~|~Plan Split for Crack Sealing the NHS routes included in the project. These routes are GRE-4, GRE-35, GRE-35, GRE-35, HAM-22 and WAR-22 This plan split covers all work on these sections. 82963~|~1~|~1~|~01/IMS~|~Plan Split for Crack Sealing the interstate routes included in the project. These routes are GRE-71, HAM-275 and HAM-275. This plan split covers all work on these sections. 81899~|~1~|~1~|~01/SAF~|~Project consists of a partial (2-leg) continuous flow intersection at Beechmont Avenue (SR 125) and Five Mile Road on the Five Mile Road leg of the intersection. This includes relocated travel and left turn lanes primarily along Five Mile Road, a new right turn lane from westbound Beechmont to southbound Five Mile. Project also includes retaining walls, landscaped median areas, and crosswalks with handicapped ramps/walks for pedestrian access. 81899~|~1~|~2~|~02/SAF~|~Wall extension being funded 100% by Hamilton County 87682~|~1~|~1~|~01/IMS~|~District Allocation - 80/20 77529~|~1~|~1~|~01/NHS~|~District Allocation 77529~|~1~|~2~|~02/NHS~|~Bridge Work: Various Bridges on HUR-20 77529~|~1~|~3~|~03/SAF~|~Long Line Pavement Markings 77529~|~1~|~4~|~04/NHS~|~Bridge No. HUR-18-1523L Bridge Hit on Span 2 over Southbound (Westbound) U.S. Route 20 117209~|~1~|~1~|~01/MPO/COLT~|~Addition of 8' sidewalks along Springdale Road from Colerain Avenue to Loralinda Drive. Improvements to the pedestrian crossings. 110787~|~1~|~1~|~01/NHS~|~Slide repair BRO 52 16.46 105786~|~1~|~1~|~01/S>2~|~Plan split for paving work 88132~|~1~|~1~|~01/IMS~|~add fourth lane southbound, add c-d to anthony wayne-galbraith-wb SR126 and auxiliary lane from shepherd to c-d 88132~|~1~|~2~|~02/IMS~|~rehab of pavement southbound 75 from galbraith to shepherd in conjucntion with major new project to add a lane and auxiliary lane. 88132~|~1~|~3~|~03/IMS~|~major rehab of pavement in conjunction with major new to add a lane southbound from galbraith to shepherd. 121024~|~1~|~1~|~01/NFP~|~bridge maintenance. 105298~|~1~|~1~|~01/STR~|~Resurfacing HAS-250 and HAS-9 in the Village of Cadiz 101860~|~1~|~1~|~01/IMS~|~This split is for district bridge sealing. 101860~|~1~|~2~|~02/NHS~|~NHS bridges for sealing 101860~|~1~|~3~|~03/IMS~|~Non major bridge funding event 101860~|~1~|~4~|~04/NHS~|~NHS bridge non major bridge 100971~|~1~|~1~|~01/STR~|~DSR# BEL-003 100971~|~1~|~2~|~02/STR~|~DSR# BEL-028 102909~|~1~|~1~|~01/NHS~|~NHS pavement 82835~|~1~|~1~|~01/STR~|~Rural other federal aid. Two-Lane resurfacing project using an asphalt overlay treatment. HOC 327 0.00-4.56. 106776~|~1~|~1~|~01/NHS~|~The project involves the repair of a couple of beams using heat straightening and replacement of damaged crossframes on bridge JEF-22-0590 (SFN 4101804), caused by a hit by an overheight vehicle. 106002~|~1~|~5~|~05/IMS~|~Replace structure. 106002~|~1~|~6~|~06/IMS~|~Extending length of ramp structure, no added capacity. 106002~|~1~|~4~|~04/IMS~|~Deck replacements and widening for added capacity. 106002~|~1~|~3~|~03/IMS~|~Deck replacements, no added capacity. 106002~|~1~|~2~|~02/IMS~|~Adding new lane on SUM IR-77 northbound from S Arlington Rd to Killian Rd and SUM-IR 77 SB from Warner Rd to US 224 and adding second permanent lane on Ramp A (IR 277 EB to IR 77 SB) and Ramp B-2 (IR 77 NB to IR 277 EB). 106002~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement on SUM IR-77 from Arlington Road Interchange to the IR-77/IR-277/US 224 Interchange, section of Warner Road and Ramps B (IR 77 SB to IR 277 WB), B-1 (IR 277 WB to IR 77 SB), C (IR 77 NB to IR 277 EB), C-1 (IR 277 WB to IR 77 NB), C-2 (IR 77 SB to IR 277 EB), D (IR 277 WB to IR 77 NB), D (Arlington Rd SB to IR 77 NB). 106002~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment 114426~|~1~|~1~|~01/STR~|~"01/STR/BR/ " 80% federal (4PF7) and 20% state (4PS7) - repair of SFN 6403573 97161~|~1~|~1~|~01/S>2~|~Long line striping on various routes throughout Stark County 117105~|~1~|~1~|~01/MPO/GREE~|~Resurfacing. 107962~|~1~|~2~|~02/NFA~|~WAY SR 0604 04.29-07.56- Chip Seal 107962~|~1~|~1~|~01/STR~|~ASD SR 0060 26.227-30.31; MED SR 0162 02.973-07.29; MED SR 0162 07.81-12.44; WAY SR 0094 00.25-06.701; WAY SR 0539 08.74-12.73; WAY SR 0604 00.02-01.006; WAY SR 0604 01.133-03.798- Chip Seal 104269~|~1~|~1~|~01/NFP~|~Split for bridge work 121808~|~1~|~1~|~01/MPO~|~Plan split for MPO funded eligible work for resurfacing and storm culvert replacements. 112275~|~1~|~1~|~01/BRF/KCEO~|~Ohio Bridge Partnership Program - 5BP7 (80% Federal) / LNTP ( 20% Local TRC) - See CAP Comment - Replacement of SFN 4235843 Caves Road over Barney Run. 115053~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 518 over Willard Run. 116744~|~1~|~1~|~01/STR~|~Culvert replacement plan split for MAD-42-19.767. 110593~|~1~|~1~|~01/BRO~|~All the work to replace the bridge. District federal and state funds. 115124~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall. 118861~|~1~|~1~|~01/NHS~|~Culvert Lining SR 2. 120606~|~1~|~1~|~01/STR~|~MED SR 0094 07.64-07.94- Pavement Overlay 120606~|~1~|~2~|~02/STR~|~Installation of drainage and associated curb on SR 94 82524~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 681 0884 (SFN 0504653). Rural other federal aid funded 80 federal/20 state. Bridge is 26 ft in length. 82524~|~1~|~2~|~02/STR~|~Bridge replacement project. ATH 681 0910 (SFN 0504688). Rural other federal aid funded 80 federal/20 state. Bridge is 19 ft in length. 101022~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4CP7 (100% State) - See CAP Comment - Guardrail Upgrade on various routes within the district. 109922~|~1~|~1~|~01/STR~|~District preservation funds. 105202~|~1~|~1~|~01/IMS~|~plan split for resurfacing on WAR-71 123765~|~1~|~1~|~01/SAF~|~Plan split for RPM replacement work 108355~|~1~|~1~|~01/STR~|~Bridge painting project. HOC 374 12.90 (SFN 3704084). Rural other federal aid funded 80 federal/20 state. 108355~|~1~|~2~|~02/S<2~|~Bridge painting project. ATH 278 2.94 (SFN 0503347). Urban other federal aid funded 80 federal/20 state. 105340~|~1~|~1~|~01/STR~|~Microsurface on rural route: LOG SR 708 SLM 0.00 to 0.71 105340~|~1~|~2~|~02/S<2~|~Microsurface on small urban route: LOG SR 708 SLM 0.71 to 2.32 107549~|~1~|~1~|~01/STR~|~Resurfacing TUS-258 123611~|~1~|~1~|~01/S5K~|~Plan Split STP 5,000-49,999 99558~|~1~|~1~|~01/S>2~|~Widening of SR-747 between Princeton Road and Millikin Road from 2-10' wide lanes to 5-12' wide lanes with 4' paved shoulders. Improvements to the roadway profile. Construction of a 5' wide sidewalk on the west side and a 10' wide multi-use path on the east side of SR-747. Construction of an eastbound right turn lane from Millikin to SR-747 and a northbound right turn lane from SR-747 to Princeton Road. 99558~|~1~|~2~|~02/S>2~|~Plan split for 100% locally funded waterworks improvements being constructed as part of the project. 120050~|~1~|~1~|~01/NFP~|~Lighting upgrades/replacements. 117377~|~1~|~1~|~01/MPO/SEBR~|~Resurfacing. 80966~|~1~|~1~|~01/ERD~|~The construction of the pedestrian bridge will use the following federal fund source:1) Earmark OH185 w/TRC (100% Federal)2) Earmark OH185 w/out TRC (80% Federal / 20% Local)3) Earmark OH313 w/TRC (100% Federal)4) MPO Transportation Alternative funds (80% Federal / 20% Local) 80966~|~1~|~2~|~02/NFP~|~Added alternative work items that are 100% local participation. 109089~|~1~|~1~|~01/SAF~|~Widening of Tylersville Road from a 2 lane section to a 3 lane section. Dedicated turn lanes will be constructed at intersections, and a two way left turn lane will be provided between intersections. 114783~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4. 86054~|~1~|~1~|~01/BRF~|~CEAO Bridge Rehab (modify abutments and new superstructure)Local - Fayette County Engineer2432773 FAY CR37 2.96 Intersect: Crooked Creek- Clemens Rd 109067~|~1~|~1~|~01/STR/TUSC~|~Resurfacing on County Road using 80%/20% Federal/Local funds. 111160~|~1~|~1~|~01/NFP/ODNR~|~Parks -ODNR - State - 4BF7 (100% State) - No CAP - Resurface in ODNR Salt Fork State Park: R-14 and cabin facilities, F-26 and F-27 parking lots 111160~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 119077~|~1~|~1~|~01/IMS~|~Plan split for project to rehabilitate bridge HAM-275-2016 which carries Mill Rd over I-275. Rehab will include replacing the concrete wearing surface, fence, joints, and bearings. 91019~|~1~|~1~|~01/IMS~|~Smooth seal IR 75 SLM 0.00 to 4.92 in Miami County. 102767~|~1~|~1~|~01/STR~|~This plan split is for work on rural bridges. 107337~|~1~|~1~|~01/S>2~|~See linked structure > 20' span. 123766~|~1~|~1~|~01/SAF~|~Plan split for pavement markings 96324~|~1~|~2~|~02/S>2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation on Fai-256-05.88 SFN 2303124 96324~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of various bridges on OFAH-Rural routes in District 5 120704~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay. 120704~|~1~|~2~|~02/BRO~|~Bridge Rehabilitation. 111369~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer's FY2025 pavement marking project funded by CEAO. 4HB7 - see cap comments. 123987~|~1~|~1~|~01/SAF~|~All items of work associated with the conversion of a one lane exit ramp to a two lane exit ramp. 114988~|~1~|~1~|~01/NFP~|~Guardrail Repairs. 104863~|~1~|~2~|~02/MPO~|~Work on E Maple St TBD. 104863~|~1~|~1~|~01/ENH~|~Work TBD. 104863~|~1~|~3~|~03/MPO~|~Minor bridge work > 20' span. 119714~|~1~|~1~|~01/NFP/GCEO~|~Resurfacing and related roadway work on CR 95 111451~|~1~|~1~|~01/CMQ~|~Widening of North Fairfield Road from Plantation Place to Shakertown Road to three lanes to provide a center two-way left turn lane. Construction of a sidewalk and side path. Construction of curb, gutter, and storm sewer system. 111451~|~1~|~2~|~02/CMQ~|~Widening of North Fairfield Road from Fairbrook Elementary School to Plantation Place to provide a center two-way left turn lane. Addition of sidewalk on both sides of the roadway. 101333~|~1~|~1~|~01/NHS~|~Replace structure. 98389~|~1~|~2~|~02/S>2~|~Minor bridge work > 20' span. 98389~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 98389~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span. 98389~|~1~|~1~|~01/S>2~|~Resurfacing STA 44 8.84 to 12.19 and STA 153 4.00 to 5.17. 104297~|~1~|~1~|~01/MPO~|~plan split 111537~|~1~|~1~|~01/MPO~|~TMACOG Funded Scope on Newton Rd. 111537~|~1~|~2~|~02/S50~|~WOO-25 from 11.76 11.95 - Urban Paving funds 111537~|~1~|~3~|~03/NFA~|~Plan Split for 100% Local cost, including pavement repair and asphalt rejuvenator 117387~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 111011~|~1~|~1~|~01/SAF~|~Intersection improvement of STA SR 687 at Dressler Rd by realignment of Northern and Southern legs, add raised islands on NW and SE quadrants, reconfigure signal phases and timings and add backplates. 111011~|~1~|~2~|~02/SAF/AQUA~|~Aqua Ohio waterline lowering work. 111011~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 94012~|~1~|~1~|~01/SAF~|~100% SRTS funding for multi-use path 104916~|~1~|~1~|~01/NFA~|~North Canton Schools school bus replacement project 93531~|~1~|~1~|~01/SAE~|~Add sidewalk along Compton Road between Hilltom and Poage Farm Road, including curb ramps, crosswalks, and signing at intersections. 110443~|~1~|~1~|~01/SAF~|~Intersection improvement project. Work includes signals, markings, curb, and pedestrian improvements. MOE 26 16.85-16.95, MOE 26 16.77-16.80, MOE 78 15.72-15.75, MOE 78 15.85-15.88. Funded 100% state Safety. 110443~|~1~|~2~|~02/SAF~|~100% local items. 95274~|~1~|~1~|~01/NHS~|~District Preservation Program funds SACs 4PF7 and 4PS7. NHS. No local funds. 112831~|~1~|~1~|~01/STR~|~Resurfacing US 250 119349~|~1~|~1~|~01/NHS~|~Superstructure replacement. 95510~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 146-17.55 to 25.78 95510~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 146-16.21 to 17.55 115843~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2028. Various routes and sections in D10. 112308~|~1~|~1~|~01/STR~|~Resurfacing on Darke County routes: CR9-4.57-9.72 CR76-0.23-5.20 112308~|~1~|~2~|~02/NFA~|~Resurfacing on Darke County route: DAR-CR-35 5.62-11.09 108453~|~1~|~1~|~01/MPO~|~Resurfacing of CR 16 from Cuyahoga Falls North Corp Limit to Boston Heights South Corp Limit. 104081~|~1~|~1~|~01/BRF~|~Bridge Replacement on Buckingham Road. 83389~|~1~|~1~|~01/NHS~|~Widening of WAS SR 7 to add left turn lanes and reconstruction and relocation of Acme Street to realign the intersection of SR 7 and construct dual SB left turn lanes. Funded 90% Safety 4HJ7/10% State 4BC7 and 80% Federal (WWW-MPO) and 20% Local on NHS. 83389~|~1~|~2~|~02/NHS~|~Intersection improvement at Pike (SR 7) and Acme Street in City of Marietta. 100% Local (City) items. 83111~|~1~|~2~|~02/STR~|~"O2/STR/OT/ " - District Preservation Marking Pavemnent Funding 4MP7(100% State) - No CAP - Marking Pavements on 1) LIC SR37 0-11.73; 2) LIC SR37 16.59-24.97 83111~|~1~|~1~|~01/STR~|~"O1/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) LIC SR37 0-11.73; 2) LIC SR37 16.59-24.97 83111~|~1~|~3~|~03/STR/JOHN~|~"03/STR/OT/JOHN" - Local funding - 4BG7 (100%) - No CAP - Curb and Gutter work in the Village of Johnstown. 123557~|~1~|~1~|~01/BRO~|~Rehabilitation of the Fishinger Rd (CR-52) over the Scioto River. 101633~|~1~|~1~|~01/IMS~|~Building demo along I-76 and Main/Broadway interchange. 114435~|~1~|~1~|~01/STR~|~Culvert replacement 89193~|~1~|~2~|~02/STR~|~D6 $ (4PF7/4PS7) to replace culvert at SLM 4.3702/STR/OT/ 89193~|~1~|~1~|~01/SAF~|~Safety $ (4RS7/4BC7) to lower road profile to improve sight distance01/SAF/OT/ 80986~|~1~|~1~|~01/ERD~|~80/20 fed/local split for earmark funds. 123015~|~1~|~1~|~01/NFP~|~Fence installation and repair along various routes throughout District 4. 94441~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation 122282~|~1~|~1~|~01/BRO~|~Bridge work. 120742~|~1~|~1~|~01/NFP~|~Sanitary Sewer Extension. 110646~|~1~|~2~|~02/STR~|~Minor bridge rehab 10' to 20' span. 110646~|~1~|~1~|~01/STR~|~Resurfacing. 107453~|~1~|~1~|~01/STR~|~AC overlay 96213~|~1~|~1~|~01/STR~|~All Items of work associated with the replacement of MRW-314-8.08 (SFN 5903033) and MRW-314-20.57 (SFN 5903394) 111038~|~1~|~1~|~01/STR~|~Bridge replacement JAC-776-6.18 95602~|~1~|~1~|~01/NHS~|~JAC 35 2.74-8.35 93591~|~1~|~2~|~02/NFP/Prbg~|~WOO-20-1.07 to 1.14 WOO-65-8.67 to 19.35 in Perrysburg. This includes pavement repairs, curb, curb ramps, and sidewalks. 93591~|~1~|~1~|~01/S>2/Prbg~|~WOO-20-1.07 to 1.14 WOO-65-18.67 to 19.35 in Perrysburg. 114346~|~1~|~1~|~01/ENH~|~Paving B&O bike trail Butler to Bellville 109500~|~1~|~1~|~01/NFP~|~Construction a traffic signal and crosswalk eligible for State-aid 91039~|~1~|~1~|~01/BRO/CUY~|~80/20 funding split for all work using local BR funds. 92894~|~1~|~1~|~01/STR~|~This Plan Split is for road work eligible to use the federal funds from CEAO. 113339~|~1~|~1~|~01/SAF~|~R-WR striping on various routes (SUM-76, STA-77, STA-62, SUM-77, SUM-21, SUM-585, TRU-422, & WAY-585). 98001~|~1~|~1~|~01/STR~|~Resurfacing along SR 83 and US 22 in Muskingum County. Preventative Maintenace along bridges within project limits. 98001~|~1~|~2~|~02/STR/NWCD~|~Resurfacing with related work along US 22 in the Village of New Concord & along SR 83 in Muskingum County. 118973~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding 120677~|~1~|~1~|~01/S>2~|~Resurfacing work with MPO funding 110062~|~2~|~2~|~02/STR~|~Work on FRA-665 from 6.99 to 7.39 - rural section 110062~|~2~|~3~|~03/S>2~|~Work on FRA-665 from 7.39 to 8.34 - Columbus Urban Area 110062~|~2~|~4~|~04/S>2~|~Replacement of FRA-665-7.108, FRA-665-7.257, and FRA-665-8.185 culverts 110062~|~1~|~5~|~05/SAF~|~Items of work associated with R-WR pavement markings 110062~|~1~|~1~|~01/NHS~|~NHS Plan Split: PIC-23-0.00-5.78 & 10.32-10.51 (pavement repairs only) 110062~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 97537~|~1~|~1~|~01/SAF~|~Installation of Preeway Service Patroland Traffic 511 signs in the Cincinnati and Dayton metro areas. 88833~|~1~|~1~|~01/NHS~|~01/NHS/PV/ - District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No cap - resurfacing on US30 100985~|~1~|~1~|~01/S<2~|~Emergency A project on JAC 327 10.92 to replace a culvert and repair the roadway due to flood damage. 107201~|~1~|~3~|~03/IMS~|~replace existing bridge width 107201~|~1~|~4~|~04/NHS~|~Widening bridges to provide a third lane 107201~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement, SLM 0.00 to 1.41 and 1.78 to 5.29 107201~|~1~|~2~|~02/NHS~|~Widening of pavement to add a third lane, SLM 0.00 to 1.41 and 1.78 to 5.29 107201~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 122806~|~1~|~1~|~01/BRF~|~Bridge replacement 118420~|~1~|~1~|~01/NHS~|~Pavement removal and replacement. GAL 35 15.96. 113857~|~1~|~1~|~01/SAF~|~Safety funding plan split 113857~|~1~|~2~|~02/NFA~|~Plan Split for 100% locally funded scope items that are not eligible for Safety funding, such as landscaping and streetscape items. 101982~|~1~|~1~|~01/STR~|~01/STR/PV/TUS - Rural portion of work at 80% federal/20% local. 101982~|~1~|~2~|~02/S<2~|~02/S<2/PV/TUS - Urban portion of work at 80% federal/20% local. 99742~|~1~|~1~|~01/BRF~|~Ohio Bridge Partnership Program. SFN 5234158, State Road 97852~|~1~|~1~|~01/BRF~|~Replace Beechtree Rd structure over Mason Run (SFN 2567660) in Whitehall 97852~|~1~|~3~|~03/BRF~|~Replace MAD-CR 85-0.12 (SFN 4931629) structure over Bradford Creek 97852~|~1~|~2~|~02/S>2~|~City waterline relocation along Beechtree Rd 93460~|~1~|~4~|~04/BRO~|~Split for work involving The Illuminating Company 93460~|~1~|~3~|~03/BRO~|~Split for work involving Dominion East Ohio 93460~|~1~|~1~|~01/BRO~|~80% Federal / 20% Local participation using Local Bridge and MPO STP funds for the replacement SFN 1869388. 93460~|~1~|~2~|~02/BRO~|~Split for work relocating AT&T Ohio 102933~|~1~|~1~|~01/STR~|~STP Rural eligible. 95133~|~1~|~1~|~01/STR~|~Culvert Replacements. ATB-SR45-0.56, ATB-SR45-18.62, ATB-SR534-4.02, in the County of Ashtabula, Ohio. 108775~|~1~|~1~|~01/NFA/CKVL~|~Village of Crooksville Muncipal Bridge Funding - 4R87 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comment - Replacement of bridge (SFN 6433634) carrying Industrial Driver (MR 80) over Moxahala Creek. 100051~|~1~|~2~|~02/IMS~|~Districtwide mowing - Preble County in D8. 100051~|~1~|~1~|~01/IMS~|~Districtwide mowing - various routes 107846~|~1~|~1~|~01/NHS~|~All work is in this plan split. District preservation funds. 112948~|~1~|~1~|~01/NFA~|~Replace all of the wood sidewalk, cantilever supports, and railing posts and panels. 103722~|~1~|~1~|~01/S<2~|~Pavement marking on various county roads; Urban Federal. 103722~|~1~|~2~|~02/NFA~|~Pavement marking on various county roads; Urban Non Federal. 103722~|~1~|~3~|~03/STR~|~Pavement marking on various county roads; Rural Federal. 103722~|~1~|~4~|~04/NFA~|~pavement marking on various county roads; Rural Non Federal. 111022~|~1~|~1~|~01/SAF~|~Safety funded Plans split 123339~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project on WAS CR 42. 101290~|~1~|~2~|~02/STR~|~Resurfacing STP Rural eligible portion (slm 5.09-9.52) 101290~|~1~|~1~|~01/NHS~|~Pavement repairs on SR 18 from SLM 9.517-10.56 (NHS portion). 114728~|~1~|~1~|~01/NHS~|~Smoothseal on PIK 23. 114728~|~1~|~2~|~02/NHS~|~Bridge PM. 109305~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG CR 1 9.04, SFN 5332508. 122438~|~1~|~1~|~01/IMS~|~All items of work associated with the resurfacing of I-71. Includes work on drainage, guardrail and miscellaneous items. 110831~|~1~|~1~|~01/IMS~|~Split for slide repair work 114629~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 108895~|~1~|~1~|~01/STR~|~Emergency culvert repair by liner. 117395~|~1~|~1~|~01/NFA/TRCE~|~Bridge replacement, going from one lane to two lanes. 108047~|~1~|~1~|~01/STR~|~Traffic Improvements. 22598~|~1~|~2~|~02/NHS~|~Bridge demolition and replace with fill. ATH 50 38.11 RT, SFN 0502162. NHS route funded 80 federal/20 state. 22598~|~1~|~3~|~03/NHS~|~Preventive maintenance resurfacing using an asphalt inlay treatment on ATH 50 37.18-39.04. NHS route funded 80 federal/20 state. 22598~|~1~|~1~|~01/BRO~|~Bridge demolition and replace with fill. ATH 50 38.11 LT, (SFN 0502138). BR Eligible funded 80 federal/20 state. 106001~|~1~|~1~|~01/MPO~|~Work eligible for federal-aid 121074~|~1~|~1~|~01/STR~|~Resurfacing SR 213 108068~|~1~|~1~|~01/IMS~|~Spot paving/repair on IR 71 in FRA, DEL, MRW counties and IR 270 in FRA county. 116833~|~1~|~1~|~01/ENH/YOUN~|~Road diet, sidewalk and crosswalk enhancements. 117614~|~1~|~1~|~01/BRF~|~Bridge replacement 118055~|~1~|~1~|~01/NHS~|~Install roundabout and other ramp safety improvements 99677~|~1~|~1~|~01/NHS~|~Split for resurfacing work funded at 80% federal and 20% state 101116~|~1~|~2~|~02/NHS~|~NHS Non-Interstate bridges to be sealed 101116~|~1~|~1~|~01/IMS~|~Interstate bridge to be sealed plan split 117299~|~1~|~1~|~01/NFA~|~Created for J&C involement 114464~|~1~|~1~|~01/NFA~|~Resurfacing SR 558 from SLM 0.00 to 1.52 and SLM 2.16 to 10.15 114464~|~1~|~2~|~02/S<2~|~Resurfacing SR 558 from SLM 1.52 to SLM 2.16 114464~|~1~|~3~|~03/STR~|~Resurfacing SR 558 from SLM 10.47 to SLM 12.56 119722~|~1~|~1~|~01/NHS~|~Plan Split for Municipal Bridge funded scope. 122396~|~1~|~1~|~01/NFA~|~Plan split for resurfacing Mazurik Lake Erie Fishing Access 105121~|~1~|~1~|~01/IMS~|~Culvert rehabilitations. 112295~|~1~|~1~|~01/STR~|~Intersection improvement project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 109380~|~1~|~1~|~01/NFP~|~ODNR Culvert project in Tar Hollow State Park. 96335~|~1~|~1~|~01/NHS~|~Addition of a bikeway within existing curb lines (re-striping) on Central Parkway between Elm Street in the OTR neighborhood of Cincinnati and Marshall Avenue in the CUF neighborhood of Cincinnati. 117317~|~1~|~1~|~01/NHS~|~Safety work 95691~|~1~|~1~|~01/S>2~|~Napoleon Rd 110669~|~1~|~1~|~01/S>2~|~Resurfacing. 110669~|~1~|~2~|~02/S>2/TWIN~|~Resurfacing, urban paving in the city of Twinsburg. 110669~|~1~|~3~|~03/S>2/TWIN~|~ADA curb ramps in the City of Twinsburg. 110669~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance. 110669~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance. 109370~|~1~|~1~|~01/NFP~|~The City will improve and extend 3,500 feet of East Commerce Drive starting at Carpenter Road and ending at the Genesee Wyoming railroad tracks. 101438~|~1~|~1~|~01/STR~|~ASD-39-0.00 to 8.09ASD-89-15.57 to 18.42ASD-60-1.47 to 4.11 123703~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 681 21.18-.28.94. 116606~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and associated resurfacing work on FRA-270. 96331~|~1~|~1~|~01/MPO~|~Resurface Columbus Avenue from Bogart Road to Perkins Avenue. 96331~|~1~|~2~|~02/MPO~|~100% Local Items 119357~|~1~|~1~|~01/S>2~|~Resurfacing 124030~|~1~|~1~|~01/IMS~|~New Ramp Construction 84463~|~1~|~1~|~01/BRF~|~Messick South Rd SFN 7843852 TR 235 over baughman creek 121096~|~1~|~1~|~01/NFA~|~Plan Split 101462~|~1~|~1~|~01/S<2~|~City of Hillsboro CR 1159 93669~|~1~|~1~|~01/SAE~|~Construction of sidewalks along SR170, between Dobbins Road and Nesbit Drive, in the Village of Poland. 104822~|~1~|~1~|~01/MPO~|~See linked structure. 105404~|~1~|~1~|~01/NHS~|~Bridge painting on NHS bridges. 85159~|~1~|~1~|~01/BRO~|~Plan Split for SFN 7740018 SUM Ravenna Road Bridge over Tinkers Creek. 124628~|~1~|~1~|~01/NHS~|~All work associated with the rehab or replacement of GRE-444-0016 92975~|~1~|~1~|~01/STR~|~Rural two-lane resurfacing project. Work includes berm and striping. WAS CR 11 0.00-7.50. Federal 80% and Local 20%. 111567~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work 95268~|~1~|~1~|~01/NHS~|~Bridge over CSX RR in the City of Tiffin, SFN 7401892 115562~|~1~|~2~|~02/NFP~|~Work funded 100% by the City of Lima. 115562~|~1~|~1~|~01/S50~|~Resurfacing - 80% federal funds from the District Preservation Program budget with a 20% match provided by the City of Lima. 116148~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - 116148~|~1~|~2~|~02/S<2~|~Plan Split 02/S<2/PV/ - 116148~|~1~|~3~|~03/NFA~|~Plan Split 03/NFA/PV/ - 97763~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7 (100% State) - No CAP ? Full depth pavement repairs with related work on: 1) GUE-SR 662-0.00 ? 7.27; 2) COS-206-5.98-6.63; 3) COS-662-0.00 - 0.42; 4) COS-SR 715-0.00 ? 8.14; 5) MUS-SR 662-0.00 ? 0.45 97763~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Full depth pavement repairs with related work on: 1) Fai-US 33-17.53-17.57; 2) Fai-US 33-19.05-19.07; 3) MUS-SR 16-7.68-7.70; 4) LIC-SR 13-22.55-23.55 97763~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Full depth pavement repairs with related work on: 1) COS-60-(7.58 - 7.71); Kno-SR 229-(19.27-25.38); 2) Cos-SR 229-(00.00 to 00.70); 3)GUE-285-(4.00 to 8.00); 4) COS-541-(8.00 - 10.00); 5) FAI-204-(4.37 - 9.56); 6) LIC-310-(10.50 - 13.45) 97763~|~1~|~4~|~04/S>2~|~"04/S>2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Full depth repairs with related work on: 1) Fai-SR 204-0.36-4.37; 97894~|~1~|~1~|~01/S<2~|~MIA SR 202 0.52 repair culvert on the est side of the 72" x 44" eliptical CMP (stone arch under roadway) structure. Road closed for construction. 101186~|~1~|~1~|~01/STR~|~CO CO Contr 01 Pavement plan split added 123575~|~1~|~1~|~01/IMS~|~resurfacing a section of HAM-71 123238~|~1~|~1~|~01/S5K~|~Resurfacing. 96095~|~1~|~1~|~01/BRO~|~BR eligible for rehab (new deck)UNI-33-14.84 (8001294) Scottslawn over US33 96095~|~1~|~2~|~02/BRO~|~BR eligible for rehab (deck) UNI-33-21.02 (8001448) Brock Rd over US33 96095~|~1~|~3~|~03/NHS~|~Non-BR eligible - deck overlay - NHS routeUNI-42-4.58 (8002371) US42 over US33 96095~|~2~|~4~|~04/BRO~|~This split pays for UNI-33-0879A overlay replacement only, must be at 100% state because it is repair of work done in last 10 years. 96095~|~1~|~5~|~05/NFP~|~Repair damage to structure UNI-33-17.98 (Beecher Gamble Rd over US 33), SFN 8001383 114185~|~1~|~1~|~01/NFP~|~Replace culvert. 108898~|~1~|~1~|~01/NFP~|~The CITY will improve approximately 1,700? of Disher Drive in the City?s industrial park 93809~|~1~|~1~|~01/MPO~|~Resurfacing of Franklin Avenue (CR-501) from Cherry Street to Summit Street in the City of Kent. 124584~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of federally eligible bridges on interstate system 124215~|~1~|~1~|~01/SAF~|~Safety items 79668~|~1~|~1~|~01/IMS~|~Priority system resurfacing from iller Ave to FAI County 79668~|~1~|~2~|~02/IMS~|~Repair, patching & sealing on 15 structures (not BR eligible): 88665~|~1~|~1~|~01/SAF~|~Reconfigure the southern portion of the IR-90 and Columbia Road interchange as a diamond. 123535~|~1~|~1~|~01/IMS~|~conduit linked 93290~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Removal of SFN 4505379 (LIC-SR 158-1.64) carrying Loop Road over SR 158 93290~|~1~|~2~|~02/NFA~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Relocation of Loop Rd (LIC-MR 297) to an at grade intersection with SR 158 and grading work along SR 158 102142~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 1.56-3.68. Rural other federal aid funded 80 federal/20 state. 102142~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 0.60-1.56. Urban other federal aid funded 80 federal/20 state. 116260~|~1~|~1~|~01/NHS~|~Bridge split 116260~|~1~|~2~|~02/NHS~|~Bridge split 97976~|~1~|~1~|~01/STR~|~D09 PM 2 Lane FY20 112894~|~1~|~1~|~01/MPO~|~Construction of a shared use path from Blair Court near I-71, eastward along former rail corridor, to the intersection of Dana Avenue and Woodburn Avenue. 112808~|~1~|~1~|~01/NHS~|~Resurfacing of POR SR 43 from 7.51 to 9.89. 112808~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 112808~|~1~|~3~|~03/NHS~|~Minor bridge work > 10' to 20' span. 96337~|~1~|~1~|~01/ENH~|~Construction of a multi-use trail and supporting retaining wall in the Smale Riverfront Park (south of the reloated Mehring Way) between Elm Street and the Roebling suspension bridge. Trail will connect to the Ohio River Trail system currently being developed by Hamilton County and the City of Cincinnati. 99811~|~1~|~1~|~01/STR~|~Plan split to cover resurfacing and shoulder widening of Old 3C. 92227~|~1~|~1~|~01/BRO~|~6201628 OTT SR163 25.11 Intersect: Portage River 79750~|~1~|~1~|~01/NHS~|~Resurfacing 112796~|~1~|~1~|~01/S<2~|~Washington Court House Plan Split: FAY-62-14.60-15.49 112796~|~1~|~2~|~02/STR~|~Rural Plan Split: FAY-62-15.49-26.74 112796~|~1~|~3~|~03/S<2~|~Plan split for resurfacing of FAY-22 in WCH. 110165~|~1~|~1~|~01/STR~|~Rebuild the traffic signal and widen the radii to allow for trucks turning. 110165~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 104147~|~1~|~1~|~01/NFP~|~Guardrail 121198~|~1~|~1~|~01/NHS~|~Urban Paving 113373~|~1~|~1~|~01/NHS~|~Reduce crash frequency, improve driver visibility of traffic control devices. Improvements include replacement/relocation with mast arm poles for signal support and sign supports, advanced and improved detection, back plates, pedestrian access changes 99638~|~1~|~1~|~01/BRO~|~Replace existing box culvert structure TUS-212-1080 (SFN 7904363) with new four-sided precast box culvert structure. 102208~|~1~|~1~|~01/NFA~|~LAW CR 6 7.45 ER Slide Repair 97847~|~1~|~1~|~01/BRO~|~OBPP replacement of SFN 4130421 113521~|~1~|~1~|~01/NHS~|~01/NHS/OT/ - 80% Federal (4SF7) and 20% State (4SS7) - slide repair using soldier piling with lagging wall. 101002~|~1~|~1~|~01/S<2~|~Plan Split "01/S<2/PV/ " for Fai-159-(0.00-10.57) and Gue-265-(4.59-11.30) 112649~|~1~|~1~|~01/SAF~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11. Add new light poles, luminaires, and wiring along SR 7/US 22 overlap. Add new lighting at the US 250/SR 151 Park-N-Ride in Harrison County. Also, conversion of HPS to LED luminaires for Belmont, Columbiana, Jefferson, & Tuscarawas Counties. 110047~|~1~|~1~|~01/NHS~|~Construction change orders 120015~|~1~|~1~|~01/SAF~|~Bike & Pedestrian project. 122003~|~1~|~1~|~01/STR~|~Intersection improvement 102158~|~1~|~2~|~02/STR~|~LAW 141 0.91-8.43 102158~|~1~|~1~|~01/S<2~|~LAW 141 0.00-0.91 102158~|~1~|~3~|~03/STR~|~LAW 141 8.36 (SFN 4402324) 108662~|~1~|~1~|~01/SAF~|~THE IMPROVEMENTS ALONG THE ROUTE WILL GREATLY REDUCE THE NUMBER OF CRASHES DUE TO THE NARROW CORRIDOR WITH LESS THAN OPTIMAL PARKING DEPTH. THE STREET WILL BE WIDENED, SIGNALS BE REPLACED, PARKING BE MODIFIED, AND LANES BE REDUCED IN PART OF THE CORRIDOR FROM 4 TO 3 LANES 108662~|~1~|~2~|~02/S>2~|~overlay work on MIA-41 SLM 9.49 to 10.31 covered under UPP funds. 85252~|~1~|~1~|~01/NHS~|~resurface LUC US 20A 2.23-3.97; NHS section - SR 295 to Air Cargo Road 85252~|~1~|~4~|~04/S>2~|~plan split for 100% local items in Maumee 85252~|~1~|~2~|~02/S>2~|~resurface LUC 20A 3.97-10.54; Fed/State - Air Cargo Rd to Maumee Corp Line 85252~|~1~|~3~|~03/S>2~|~resurface LUC 20A 10.54-11.45; Fed/Local - Maumee Corp line to Ford St in Maumee 111412~|~1~|~1~|~01/ENH~|~Construct sidewalks on Duquesne St. at 95% Federal/5% Local (95% 4B37/5% LNTP) 113243~|~1~|~1~|~01/IMS~|~Repair/stabilization of embankment along IR 70 113707~|~1~|~1~|~01/NHS~|~Rebuild the traffic signal at SR-125 & Britton Blvd. 116086~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV/ - 90% 4PF7/ 10% 4PS7 108473~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 81 1.55-1.59. 100% Federal ER funds. 119823~|~1~|~1~|~01/BRF/HUDS~|~Superstructure replacement. 120414~|~1~|~1~|~01/IMS~|~Plan split for slide repair 123220~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 114117~|~1~|~1~|~01/NFA~|~Paving culvert inverts. NOB 146 7.15 (CFN 1839212) and NOB 513 6.78 (CFN 1852401). 114117~|~1~|~2~|~02/STR~|~Paving culvert inverts. WAS 550 15.49 (CFN 1885156). 106507~|~1~|~1~|~01/NFA~|~The widening of Kill road from the existing 17' road to 24' road to help accommodate semi truck traffic. 118810~|~1~|~1~|~01/STR~|~Reconstruction of Lincoln Highway. 117355~|~1~|~1~|~01/NFA~|~Bridge Replacement 124854~|~1~|~1~|~01/STR~|~Culvert replacement STP Rural 124854~|~1~|~2~|~02/NFP~|~Culvert replacement nonfederal aid 98310~|~1~|~1~|~01/STR~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 80 federal/20 state. 98310~|~1~|~2~|~02/NHS~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 80 federal/20 state. 98310~|~1~|~3~|~03/S<2~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 80 federal/20 state. 98310~|~1~|~4~|~04/NFA~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 100 state. 96955~|~1~|~1~|~01/NHS/ADA~|~It is proposed to Replace Superstructure, and keep existing substructure on US 52, 0.04 miles from Rome Corp limit in Adams Co. 101311~|~1~|~1~|~01/NFP~|~Work to replace the bridge. 95% state funds SAC 4C87. Part of the Federal/State Exchange Program. The match is provided by the Hancock County Engineer. 119781~|~1~|~1~|~01/STR~|~added plan split. 110845~|~1~|~1~|~01/NFA~|~Replacement of the structure > 20' span. 106342~|~1~|~1~|~01/NFA~|~Construct sidewalk between school and southern sub-divisions; improve crosswalk safety and signage. 106342~|~1~|~3~|~03/SAF~|~Curb bump-out 106342~|~1~|~2~|~02/NFA~|~Pedestrian Accommodations at Location 3, SR 113 and SR 601. 121680~|~1~|~1~|~01/ENH~|~Sidewalk improvements in the Village of Wintersville utilizing BHJ TAP (4TC7) Federal funds at 80/20 up to the project CAP. 101931~|~1~|~1~|~01/BRF~|~Bridge replacement on Cummings Road. 76257~|~4~|~4~|~04/NFA~|~Utility work including new storm sewer trunk line and junction chambers outside the State LA Right-of-way. 76257~|~1~|~1~|~01/IMS~|~Major rehabilitation of pavement, bridge work, and other work determined by the study phase. 76257~|~3~|~3~|~03/NFA~|~Alternate lighting bid items selected by the City. 76257~|~2~|~2~|~02/NHS~|~Major rehabilitation of pavement, bridge work, and other work determined by the study phase. 119302~|~1~|~1~|~01/SAE/GCEO~|~Application of new pavement markings on various county routes in Greene County. 112329~|~1~|~1~|~01/SAF~|~SCI-73-21.00 to 21.85 (Coles Park) 112329~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 121627~|~1~|~1~|~01/S>2~|~Reconstruct roadway & improve ped/bike facilities 97272~|~1~|~1~|~01/STR~|~District wide herbicidal spray project. 94182~|~1~|~1~|~01/STR~|~perform minor spray liner work to bridge culverts. 94182~|~1~|~2~|~02/NHS~|~Rehab of structure CLE-125-1012 114511~|~1~|~1~|~01/IMS~|~Resurfacing 104149~|~1~|~1~|~01/NFP~|~Guardrail 120878~|~1~|~1~|~01/MPO/FAIR~|~OKI Transportation Alternative funded construction of a portion of the Great Miami River Trail. 50% local match required. 123447~|~1~|~1~|~01/NFP~|~added split for deck sealing project FY30. 118187~|~1~|~1~|~01/IMS~|~All items of work for structures that are located on or above an interstate. 118187~|~1~|~2~|~02/NHS~|~All items of work associated with the structures located on US 35. 123707~|~1~|~1~|~01/NFP~|~Plan split for resurfacing parkways and parking lots in Big Creek Reservation eligible for State Metropark funds. 97850~|~1~|~3~|~03/BRF~|~Replace MRW-TR152-0.32 (Coleman Rd) structure over Whetstone Creek SFN 5930367 0.7 mi SE of Beatty Rd (CR 149) 97850~|~1~|~2~|~02/BRF~|~Replace MRW-TR 129-0.14 (Bennett Rd) structure over Whetstone Creek SFN 5931614. 0.2 mi E of Olds Rd (TR 128) 97850~|~1~|~1~|~01/BRO~|~Replace MAR-CR 138 C -1.64 (Barks Rd East) structure over Qu Qua Ditch SFN 5132347. 0.3 mi E of SR 423 122223~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-80-F 94601~|~1~|~1~|~01/NFP~|~Auxilary pavement markings in Ashtabula, Mahoning, and Trumbull Counties, Ohio. 102049~|~1~|~1~|~01/NFA~|~The Port is assisting the city of Zanesville and Genesis Healh Care's new facility to construct a new road that will support a second entrance. 101700~|~1~|~1~|~01/NHS~|~NHS 80/20 District Allocation/City of Lorain 101700~|~1~|~2~|~02/NHS~|~NHS 100% City of Lorain 101700~|~1~|~3~|~03/NHS~|~NHS Bridge 108102~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS route bridges. 108102~|~2~|~2~|~02/NHS~|~AC Overlay with Repairs on Us 35 SLM 2608 to 18.59 108102~|~1~|~3~|~03/NHS~|~Funds to replace a maintenance of traffic item damaged during construction 89361~|~1~|~1~|~01/NFA~|~Bicycle path construction 117409~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing Countyline Rd. 117409~|~2~|~2~|~02/MPO/TRCE~|~Resurfacing W Webb Rd. 97385~|~1~|~1~|~01/S<2/FIND~|~For all work in this project. 106623~|~1~|~1~|~01/SAF~|~Micromilling IR 75 NB lanes at spot location with wet crash trends. 121881~|~1~|~1~|~01/S5K~|~Chip Seal on ATH CR 29 0.00-0.385. 121881~|~1~|~2~|~02/NFA~|~Chip Seal on ATH CR 29 0.385-4.154. 101398~|~1~|~1~|~01/BRO~|~Bridge. 105091~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan SPlit 1 112665~|~1~|~1~|~01/IMS~|~Field paving of Culverts:FRA-71-21.61DEL-71-2.40 118806~|~1~|~1~|~01/STR~|~Full depth roadway reconstruction work. 118806~|~1~|~2~|~02/STR~|~Sidewalk and curb replacements. 92881~|~1~|~1~|~01/S>2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): Resurfacing-Urban Paving City of AvonLOR 0254 2.83 (Sheffield/Avon Corp.) to 5.56 (200' W. of Clifton Way) (SUSPEND)(RESUME) LOR 0254 7.78 (300? East of Nagle Rd) to 8.85 (NE Avon Corp/Cuyahoga Co. Line). 92881~|~1~|~2~|~02/S>2~|~100% Local (Avon): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): Resurfacing-Urban Paving City of AvonLOR 0254 2.83 (Sheffield/Avon Corp.) to 5.56 (200' W. of Clifton Way) (SUSPEND)(RESUME) LOR 0254 7.78 (300? East of Nagle Rd) to 8.85 (NE Avon Corp/Cuyahoga Co. Line). 111232~|~1~|~1~|~01/ENH~|~"01/ENH/OT/LCPD" - Licking County Park District approved TA project for construction of multi-use path under along TR-171 (Canal Road) from SR-79 to Village of Hebron. 4B37 Enhancements - see Cap Comments 90202~|~1~|~1~|~01/IMS~|~Split for bridge work on the interstate system. 90202~|~1~|~2~|~02/S>2~|~Split for bridge work on the urban STP system. 100668~|~1~|~1~|~01/NHS~|~SFN 4800303 120180~|~1~|~1~|~01/ENH~|~Multimodal enhancement project at 100% up to Federal CAP (80% Carbon Reduction and 20% Safety). 115122~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall. 119654~|~1~|~1~|~01/NFA~|~Plan split for grade separation work 99549~|~1~|~1~|~01/NHS~|~NHS Culvert: RIC-30-15.32 99549~|~1~|~2~|~02/S<2~|~STP < 200000 Culvert: RIC-309-3.21 24853~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 97971~|~1~|~1~|~01/SAF/LCEO~|~"01/SAF/OT/LCEO" - CEAO HSIP Funding - CAP'ed @ $150,000.00 4HB7 - 4HB7 (100% Federal) - Pavement Marking upgrade on various County Routes County wide 92856~|~1~|~1~|~01/STR~|~SCI SR772 1.99 Slide Repair On SR772, begin project 1.99 miles north of its junction with SR73. 80 Fed/20 State 01/STR/OT/State 92856~|~1~|~2~|~02/STR~|~Change Order to cover work on an Emergency Slide Project. DSR# SCI-001. 97381~|~1~|~2~|~02/S<2~|~Culvert replacement project. ATH 682 6.15. Urban other federal aid funded 80 federal/20 state. 97381~|~1~|~1~|~01/STR~|~Culvert replacement project. MRG 37 3.95, 7.56, MRG 78 14.25, and 14.59 Rural other federal aid funded 80 federal/20 state. 116291~|~1~|~1~|~01/STR~|~Overlay in Highland County. 119066~|~1~|~1~|~01/MPO~|~Construction of sidewalk on Bach Buxton from Valley Wood to Provision Living and on Shayler from Bach Buxton to Long Lake. 121864~|~1~|~1~|~01/STR/FRED~|~Pedestrian Facilities in the Village of Fredericktown. TAP Funded - Carbon Reduction / Safety $350,000 Construction Phase at 80% 4CT7/20% 4HJ7 76687~|~1~|~2~|~02/NHS~|~100% Columbus funded utility work02/NHS/OT/Col 76687~|~1~|~4~|~04/NHS~|~Minor existing bridg work2502100 FRA US33 27.51 Intersect: Cable Bowman Ditch2502135 FRA US33 27.51 Intersect: Cable Bowman Ditch04/NHS/BR/Ex 76687~|~1~|~3~|~03/NHS~|~Construct new bridge for Bixby Rd over US-3303/NHS/BR/New 76687~|~1~|~1~|~01/NHS~|~Pvmt work to convert Rager Rd into cul-de-sacs.Pvmt work to convert Bixby Rd into an interchange01/NHS/PV/ 122130~|~1~|~1~|~01/BRF~|~Replace single span bridge on Rector Road over Yellowbud Creek. Federal/State Exchange Project. 113673~|~1~|~1~|~01/S<2~|~This split will cover pavement replacement and associated work outside the CIty of Circleville. 113673~|~1~|~2~|~02/S50~|~Items associated with Resurfacing within the City of Circleville 113673~|~1~|~3~|~03/S50~|~100% City Items - Full Depth Pavement w/in City, Sidewalk, Curbs, Curb Ramps and Pavement Repairs 124603~|~1~|~1~|~01/STR~|~CEAO HSIP Safety project to install and upgrade raised pavement markings and pavement markings on various county roads. 108480~|~1~|~1~|~01/IMS~|~auxiliary lane construction 117224~|~1~|~1~|~01/IMS~|~Split for interstate resurfacing work 103885~|~1~|~1~|~01/S>2~|~Urban Paving on SR 201 in the City of Huber Heights. 118706~|~1~|~1~|~01/NHS~|~MEG US 33-6.30/6.45 686 ft/438 ft rockfall hazard remediation. 85395~|~1~|~1~|~01/NFA~|~100% local funding for this project at this time. 120952~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of DEL SR 521 and DEL CR 34 (Galena Rd) 109936~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2025. GAL 35 13.52-17.909 and GAL 735 0.39-1.059. NHS funded 80% Federal/20% State. 109936~|~1~|~2~|~02/S5K~|~Guardrail upgrade/replacement project for FY2025. ATH 13 2.709-2.906, 3.933-4.944 and GAL 160 2.470-3.00. Urban federal aid funded 80 Federal/20 State. 109936~|~1~|~3~|~03/STR~|~Guardrail upgrade/replacement project for FY2025. ATH 13 0.08-2.709, 4.944-9.39 and ATH 144 4.44-14.14. Rural federal aid funded 80 Federal/ 20 State. 109936~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement project for FY25. Bridge rail GAL 790 39.45, SFN 2704781. 94224~|~1~|~1~|~01/IMS~|~District wide bridge maintenance project. 94224~|~1~|~2~|~02/NHS~|~District wide bridge maintenance project. 94224~|~1~|~3~|~03/S>2~|~District wide bridge maintenance project. 122952~|~1~|~1~|~01/STR~|~ADA Compliance at Hocking Co Rest Area 10-29. 122986~|~1~|~1~|~01/MPO~|~Extend a shared bike and pedestrian path along US-42 from the entrance of Heritage Oak Park to State Route 741. Path to be 10' in width separated by grass lawn from roadway. 123780~|~1~|~1~|~01/NHS~|~Superstructure Replacement. 90833~|~1~|~1~|~01/CMQ~|~Construct a bikeway starting at State Route 202 running South East abandoned railroad right of way to Lost Creek. Will run North East on an existing turf shelf along the creek, cross Knoop Road, and go under the existing bridge on State Route 41 into the main section of the reserve. 1.67 mile trail from existing Great Miami River Recreational Trail at State Route 202 East of Troy connecting to Miami County Park District Lost Creek Reserve. 116801~|~1~|~1~|~01/STR~|~Rural 113409~|~1~|~1~|~01/NHS~|~Westbound bridge on SR 2 over Columbus Avenue was hit on Tuesday 4/28 by a vehicle on Columbus Avenue, damaging the north outside beam. 89488~|~1~|~1~|~01/SAE~|~UPGRADE EXISTING PAVEMENT MARKINGS, INCLUDING CENTERLINE, EDGE LINE, AND RR SYMBOL MARKINGS at various locations in Mercer County. 116579~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG SR 689 1.87, CFN 1881039. 114296~|~1~|~1~|~01/SAF~|~01/SAF/OT/PATA - 80% Federal (4HJ7) and 20% State (4BC7) - intersection improvements to SR 16/Summit Road in Pataskala. 95536~|~1~|~1~|~01/NFA~|~General System chip sealing including pavement repairs and pavement marking on CAR-524 from SLM 0.00 to SLM 5.24 and JEF-646 from SLM 0.00 to SLM 7.36. 113714~|~1~|~1~|~01/SAF~|~Install a single-lane roundabout at the intersection of Stahlheber and Morman Road in Hanover Township. 91717~|~1~|~1~|~01/BRO~|~Culvert repair 98000~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2020. 98000~|~1~|~2~|~02/SAF~|~Replace the standard pavement marking with pavement markings containing wet reflective elements. Funded 100% State Safety. 98779~|~1~|~1~|~01/MPO~|~Rehabilitate two bridges in Mill Creek Park...Orchard Meadow Bridge on West Drive and Rogers Bridge on Lily Pond Drive. These bridges are on private park roads, they are not on the functional class system and do not have SFNs. 121859~|~1~|~1~|~01/SAE~|~Plan split for concrete speed cushions. 114744~|~1~|~1~|~01/NHS~|~ROS overlay. 87078~|~1~|~1~|~01/BRF~|~Rehabilitation to include superstructure replacement, modification of abutments and piers for new beams, approach work to correct vertical curbe deficiencies, new guardral installation on the bridge over St. Marys River. SFN 0634687 AUG CR 168 0266 116909~|~1~|~1~|~01/SAF~|~District-Wide fast drying pavement markers 116909~|~1~|~2~|~02/SAF~|~District-Wide fast drying pavement markers 102474~|~1~|~1~|~01/STR~|~Resurfacing of CAR-164 122938~|~1~|~1~|~01/NFA/GRAN~|~Multi-use path along the south side of River Rd 93731~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG 692 00.35, SFN 5303729. Not on any federal aid system funded 80 federal/20 state. 119553~|~1~|~1~|~01/S>2~|~Operation & pedestrian improvements 93177~|~1~|~1~|~01/NFP~|~Repair abutments on four bridges (TUS-77-1980 L & R, SFNs 7902700 and 7902735, TUS-36-1720, SFN 7900511, and TUS-258-0389, SFN 7905564) in TUS County 99552~|~1~|~1~|~01/NFP~|~VGCS bridge 102640~|~1~|~1~|~01/NHS~|~Bridge Replacement: ASD-250-11.61 (SFN 0304808)New Construction?Structure(repl) (002)?General Appraisal?Deck?Wearing Surface 118887~|~1~|~1~|~01/STR~|~Resurfacing SR 45 from SLM 22.03 to SLM 22.13 118887~|~1~|~2~|~02/S5K~|~Resurfacing SR 45 from SLM 22.13 to SLM 26.91 117452~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County. 110101~|~1~|~1~|~01/NFP~|~Signing Plans split 92721~|~1~|~1~|~01/MPO~|~State Street CR 667 0.00 - 0.61 97010~|~1~|~1~|~01/STR~|~from SLM 8.03 to SLM 8.89 124810~|~1~|~1~|~01/S>2~|~Replace the storm sewer on the west side of SR 3 and repair slopes at culvert 93146~|~1~|~1~|~01/S>2~|~Reynoldsburg urban paving of US-40, 22.45-25.19 75628~|~1~|~1~|~01/NHS~|~Rehabilitate bridge size culvert GRE-68-1481 (SFNs: 2901560) that carries US 68 over Conner Branch. Rehab to include concrete repair and scour protection. Rehabilitate bridge size culvert GRE-444-0195 (SFN: 2902613) that carries SR 444 over a tributary of Hebble Creek. Rehab to include concrete repairs, installation of a paved invert, and slope repairs. Rehabilitate bridge size culvert GRE-444-0260 (SFN: 2902672) that carries SR 444 over a tributary of Hebble Creek. Rehab to include slope repairs, concrete repairs, and invert repair. (The GRE-444-0195/0260 structures were previously included with project 25171.) 116617~|~1~|~1~|~01/SAF~|~Add roundabout to CR 28 (Frankfort Rd) and CR 65 (Crissey Rd). 114059~|~1~|~1~|~01/NFP~|~Bridge Hit HUR-18-1523L [SFN 3900274] 95380~|~1~|~1~|~01/ENH~|~test 95380~|~1~|~2~|~02/NHS~|~test 95380~|~1~|~3~|~03/SAF~|~test 100646~|~1~|~1~|~01/STR~|~Microsurfacing of JEF-43 from Richmond WCL to SLM 20.54, including minimal pavement repairs and pavement markings. 112921~|~1~|~1~|~01/NHS~|~LAW 52 15.00-18.00 112921~|~1~|~2~|~02/SAE~|~Recessed-Wet Reflective Pavement Markings. 112921~|~1~|~3~|~03/NHS~|~Bridge preventative maintenance. 112921~|~1~|~4~|~04/NHS~|~Culvert repair. 112921~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 100393~|~1~|~1~|~01/STR~|~Slide remediation along State Route 88 at the Mosquito Lake, Trumbull County. 109128~|~1~|~1~|~01/S>2~|~Demo Plan Split 117516~|~1~|~1~|~01/STR~|~All items of work associated with PIC-62-6.94 culvert 120297~|~1~|~1~|~01/S>2~|~Bridge over both CSX and NS railroad tracks to connect Ashville Pike Road with Thoroughbred Drive. 117130~|~1~|~1~|~01/S>2~|~This split includes all work associated with the project 22772~|~1~|~1~|~01/NHS~|~WIDEN US 250 FROM STRASBURG SCL TO CR 74 INCLUDING REPLACEMENT OF BRIDGE 05.11. RECONSTRUCT INTERSECTION WITH CR 78, CR 102 & RAMPS A/B INCLUDING TRAFFIC SIGNALS AND LIGHTING. This is an unfunded project. 114805~|~1~|~1~|~01/STR~|~Rural plan split 108911~|~1~|~1~|~01/ENH/STRA~|~Village of New Straitsville Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - Sidewalks and Drainage on 1) Per-SR 93-1.04 to 1.09; 2) Per-SR 93-01.40 to 01.44; 3) Per-SR 93-01.82 to 02.00; Per-SR 216-01.78 to 01.87 108911~|~2~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Resurfacing of portions of SR 93 and SR 216 105652~|~1~|~1~|~01/STR~|~WOO-281-9.36 bridge. 95792~|~1~|~2~|~02/NHS~|~Bridge Plan Split 95792~|~1~|~1~|~01/NHS~|~from SLM 13.88 to SLM 19.96 and then from SLM 22.24 to SLM 24.25 100567~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 from SLM 12.39 to 20.73 (US 250). 100567~|~1~|~2~|~02/STR~|~Resurfacing SR 751 at the Stonecreek interchange. 109013~|~1~|~1~|~01/STR~|~Culvert replacement at HOL-60-6.60 and HOL-62-5.24. 109013~|~2~|~2~|~02/NFA~|~Culvert replacement at HOL-60-2.99 107538~|~1~|~1~|~01/STR~|~Resurfacing CAR-542 101265~|~1~|~1~|~01/NHS/STRE~|~Resurfacing POR SR 43 from 17.91 to 18.86, urban paving in the City of Streetsboro. 115028~|~1~|~1~|~01/STR~|~WAY SR 0003 07.15-Culvert Replacement and WAY SR 0301-Culvert Repairs 84750~|~1~|~5~|~05/NHS~|~District Allocation 80% 4PF7 / 20% 4PS7 Work on NHS route outside Medina Corp 84750~|~1~|~3~|~03/S<2/MED~|~Urban Paving City of Medina - 80% District Allocation 4PF7 / 20% City of Medina 4BG7 84750~|~1~|~1~|~01/NHS/MED~|~Urban Paving City fo Medina - 80% District Allocation 4PF7 / 20% City of Medina 4BG7 84750~|~1~|~2~|~02/NHS/MED~|~Urban Paving City of Medina - 100% City of Medina 4BG7 Items that are 100% City Responsibilty. 84750~|~1~|~4~|~04/S<2~|~District Allocation 80% 4PF7 / 20% 4PS7 Work outside City of Medina corporation limits 110734~|~1~|~1~|~01/NFP~|~Construction Inspection 119894~|~1~|~1~|~01/IMS~|~Longitudinal joint repairs on HAM-75 105647~|~1~|~2~|~02/IMS~|~District 5 Rest Area Funds - 4BR7 (100% State) - See CAP Comment - Replacement of lighting at GUE IR 70 3.48 Westbound Weigh Station. 105647~|~1~|~1~|~01/IMS~|~District Preservation Lighting Funds - 4PF7 (Federal 90%) / 4PS7 (State 10%) - No CAP- Replacement of lighting at IR 77/US 40 interchange. 119007~|~1~|~1~|~01/IMS~|~Plan split for work associated with widening and raising the WOO-75-2993 bridge 119007~|~1~|~2~|~02/NFP~|~Bridge repair for fire damage. 106415~|~1~|~1~|~01/NFA~|~Replace Heil Drive Bridge over Sycamore Run 117668~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 78 6.22, SFN 5601622 110987~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation 119537~|~1~|~1~|~01/STR~|~Plan split for federally eligible design build team costs 117851~|~1~|~1~|~01/MPO~|~Plan Split for TMACOG STBG & CMAQ Funding 85291~|~1~|~1~|~01/STR~|~Resurface WIL SR15 8.01-14.81 115082~|~1~|~1~|~01/SAF~|~Flowage Easement Mitigation work 99018~|~1~|~1~|~01/SAF~|~District wide fast dry pavement marking 102647~|~1~|~1~|~01/NFP~|~Construct material storage building 117232~|~1~|~2~|~02/MPO~|~Plan Split for STBG-funded compact roundabout at the intersection of Monclova Rd and Waterville Monclova Rd. 117232~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ-funded roundabout at Albon Rd and Monclova Rd. 94333~|~1~|~2~|~02/S<2~|~Added second split for Split Corp with Tiffin 94333~|~1~|~3~|~03/S<2~|~This split is for items ineligible for urban pav (walk removed, curb ramp, full depth pav repairs) 94333~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 8.07 114327~|~1~|~1~|~01/NFP~|~Split for tree trimming/removal 92439~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 147 7.79, SFN 6102794. Rural other federal aid funded 80 federal/20 state. 116434~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in POR, STA and SUM counties. 114927~|~1~|~1~|~01/STR~|~Resurfacing. 116910~|~1~|~1~|~01/S5K~|~Asphalt resurfacing project on ATH CR 33 1.94-2.52, 4.25-4.88 and ATH CR 178 0.00-0.57. Concrete repair on ATH CR 33 2.52-4.25. 97544~|~1~|~3~|~03/BRF~|~SFN 7030924, Ohio Bridge Partnership Program, Kuhn Road over Marsh Run 97544~|~1~|~2~|~02/BRO~|~SFN 3942252, Ohio Bridge Partnership Program, Fairfield Angling Road over East Branch of the Huron River 97544~|~1~|~1~|~01/BRF~|~SFN 3946142, Ohio Bridge Partnership Program, Plymouth East over East Branch of the Huron River 115790~|~1~|~1~|~01/SAF~|~Safety improvements. 115790~|~2~|~2~|~02/NFP/YOUN~|~Waterline replacement. 81000~|~1~|~1~|~01/STR~|~SR-582 from SLM 6.92 to SLM 10.05 81000~|~1~|~2~|~02/IMS~|~Plan split for SFN 8707057 81000~|~1~|~3~|~03/STR~|~Plan split for SFNs 8707073 & 8707111 81000~|~1~|~4~|~04/STR~|~Culvert on SR582 @ 7.828 85247~|~1~|~4~|~04/NHS~|~Structural Steel Repair on SFN 0600245 AUG 33 1310 L and SFN 4600274 LOG 33 0696 85247~|~1~|~1~|~01/BRO~|~Structural Steel repairs on SFN 5706904 MOT 75 0712; SFN 1204238 CLA 70 1101 R; SFN 0602078 AUG 75 0498 R, and Structural Steel Repair on SFN 5503094 MIA 75 1569 85247~|~1~|~2~|~02/IMS~|~Structural Steel repairs on SFN 5501717 MIA 75 0043; SFN 1204327 CLA 70 1208 L;SFN 1204351 CLA 70 1208 R; SFN 1204203 CLA 70 1101 L; 7502648 SHE 75 1883; SFN 1205013 CLA 70 2080 L; SFN 1203630 CLA 70 0173; 0602280 AUG 75 0754... more Structural Steel repairs on SFN 5501717 MIA 75 0043; SFN 1204327 CLA 70 1208 L;SFN 1204351 CLA 70 1208 R; SFN 1204203 CLA 70 1101 L; 7502648 SHE 75 1883; SFN 1205013 CLA 70 2080 L; SFN 1203630 CLA 70 0173; 0602280 AUG 75 0754 R; SFN 1206575 CLA 370 0312; AUG 75 0754 L; SFN 1206576 CLA 70 0310; SFN 7502672 SHE 75 1883 R; SFN 1204955 CLA 70 20.80 L; SFN 7501773 SHE 75 0614 L; SFN 0602043 AUG 75 0498 L; 85247~|~1~|~3~|~03/BRO~|~Structural Steel Repair on SFN 5503094 MIA 75 1569. 85247~|~1~|~5~|~05/STR~|~Structural steel repair on SFN 5501148 MIA 48 1548; 107895~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 537 3.40-3.97. DSR MOE-016. Rural other federal aid funded 100% federal. 123721~|~1~|~1~|~01/BRO~|~All Work is within this split. 91835~|~1~|~1~|~01/NFA~|~general system asphalt overlay on BEL-379-0.00 to 6.66; includes pavement repairs, pavement marking 114741~|~1~|~1~|~01/STR~|~LAW Chipseal. 101216~|~1~|~1~|~01/NFP~|~District maintenance preservation for district wide mowing project - 4CP7 (100% State). 88338~|~1~|~1~|~01/S<2~|~"01/S<2/OT/VIOL" Violet Township SRTS Sidewalk Project. 115945~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 106 0.00-1.05. Funded through the Local Roads Oil and Shale Program. 100342~|~1~|~2~|~02/NHS~|~WOO-51-0.00 to 3.38 100342~|~1~|~1~|~01/STR~|~OTT-51 from 7.91 to 10.39 115518~|~1~|~1~|~01/BRO~|~Bridge replacement. 80% federal with an 20% match provided by Van Wert County. After all the federal funds cap is used funding will be 100% local funds from Van Wert County. 93444~|~1~|~1~|~01/CMQ/Tall~|~Safety and capacity improvements, including the addition of turn lanes and pedestrian corridor improvements, especially drainage, from Tallmadge Circle to Garwood Road, in the City of Tallmadge, Summit County, Ohio. 93767~|~1~|~1~|~01/IMS~|~AUG-75-5.15 L/R (SFNs 0602132 & 0602108) - remove and replace concrete parapets.AUG-75-5.45 (SFN 0602159) - restore semi-intergral bearing retainer functionality and patch spalled concrete at bearaing areas.SHE-75-11.08 (SFN 7502192) - overlay bridge deck, patch piers, retrofit parapet & conversion to semi-integral abutments and to include bridge painting. 93767~|~1~|~2~|~02/IMS~|~Parapet retrofit to add "wapakoneta" on the bridge over IR 75 108830~|~1~|~1~|~01/STR~|~Culvert liner project. MRG 266 2.73. 80% Federal and 20% State funds. 107515~|~1~|~1~|~01/STR~|~Resurfacing BEL-148 91715~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 5.38 (SFN 3701085). Rural other federal aid funded 80 federal/20 state. 115064~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH CR 49 0.04, SFN 0537985. 101033~|~1~|~1~|~01/NFA~|~In the Village of N. Baltimore, sidewalk and crossing improvements along the N. side of Maple St. from Rhoades Ave. to Rudolph Rd.; upgrade signage and markings. 110427~|~1~|~1~|~01/SAF~|~Intersection safety improvements using federal-aid funding 87094~|~1~|~2~|~02/STR~|~Funding split for work associated with the sealing of bridges GRE-72-0707 and GRE-72-0771. 87094~|~1~|~3~|~03/NHS~|~Costs associated with bridge GRE-72-0837 over US 35. 87094~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 72 in Greene County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 110676~|~1~|~1~|~01/STR~|~Resurfacing of POR SR 305 from 5.65 to 7.36, TRU SR 305 from 0.00 to 1.57 and TRU SR 534 from 10.41 to 12.48. 105192~|~1~|~1~|~01/STR~|~plan split for the rural sections of the chip sealing:GRE-380: SLM 0-6.36 105192~|~1~|~2~|~02/S>2~|~plan split for the large urban chip sealing sections:GRE-380: SLM 6.36-7.03 93178~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete on SR 72 from SLM 9.30 (College Avenue) to SLM 10.04 (Second Street), 98955~|~1~|~1~|~01/S>2~|~McCord Rd 118847~|~1~|~1~|~01/STR~|~added plan split. 109021~|~1~|~1~|~01/NFP~|~Type A repair contract for median barrier 99553~|~1~|~1~|~01/NFP~|~Split for resurfacing work 94936~|~1~|~1~|~01/SAF~|~Widen radii at sw corner dayton/central and ne corner dayton/broad for truck turning 120363~|~1~|~1~|~01/NFP~|~Split for Cracksealing work 117604~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 298 0.54, SFN 8437505. Funded 100% Federal. 84495~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on I-75 from north of Glendale Milford to Kemper. 84495~|~1~|~2~|~02/IMS~|~Funding split to include all work on the following bridges: HAM-75-1539L (SFN 3110923), HAM-75-1539R (SFN 3110958), and HAM-75-1642R (SFN 3111075). 104848~|~1~|~1~|~01/NHS~|~Bridge deck patching on FRA 315 2.78 over the Olentangy River, Fifth Ave, King Ave 87097~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 350 in Warren County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 103404~|~2~|~2~|~02/S<2~|~Landslide repair. DSR#BEL-011. 103404~|~1~|~1~|~01/S<2~|~Landslide repair. DSR# BEL-010. 103404~|~3~|~3~|~03/S<2~|~Landslide repair. DSR# BEL-015. 95736~|~1~|~1~|~01/NFP~|~2 year const inspection in D6 84594~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 339 1.25-4.38. Rural other federal aid funded 80 federal/20 state. 84594~|~1~|~2~|~02/S<2~|~Two-lane asphalt resurfacing project using an asphalt overlay treatment. WAS 339 0.41-1.25. Urban other federal aid funded Federal 80% and State 20% funds. 84594~|~1~|~3~|~03/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 339 0.00-0.41. NHS route funded 80 federal/20 state. 84594~|~1~|~5~|~05/NHS~|~100% City items on WAS 7 21.85-22.72. Full depth repair and curb ramp work. 84594~|~1~|~4~|~04/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 7 21.85-22.72. Urban paving in the City of Marietta. Funded 80 federal/20 local. 84594~|~1~|~6~|~06/STR~|~Change order for rumble stripes on WAS SR 339 locations. 100% Federal Safety funds. SAC 4HJ7. 110521~|~1~|~1~|~01/CMQ~|~Columbus CTSS Phase F 110521~|~1~|~2~|~02/SAF~|~Local City of Columbus Department of Technology (DOT) funded items. 93899~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 100% state 87303~|~1~|~1~|~01/BRO~|~0802018 BRO US68 41.42 Intersect: Solomon Run80 Fed/20 State. 01/BRO/BR/State 97710~|~1~|~1~|~01/NFP~|~Added plan split for subphase change 105262~|~1~|~1~|~01/IMS~|~Bridge Rehab on interstate bridges. 105262~|~1~|~2~|~02/NHS~|~Bridge rehab on NHS route bridges. 120305~|~1~|~1~|~01/NFA~|~Sidewalk replacement and installing new ADA curb ramps. 107783~|~1~|~1~|~01/STR~|~Created plan split 94385~|~1~|~1~|~01/STR~|~STR Rural Resurfacing: HUR-601-00.00 (SR 18) to 01.96 94385~|~1~|~2~|~02/S5K~|~STP 5,000 - 49,999 Resurfacing: HUR-601-1.96-5.01, ERI-601-0.00-0.93. 94151~|~1~|~1~|~01/IMS~|~Resurfacing of pvmt on I-70 from SLM 3.41-7.60 No bridge work at this time 96096~|~1~|~1~|~01/STR~|~Rehabilitation of GUE-658-11.01 96096~|~1~|~2~|~02/STR~|~Replacement of culvert on SR 666 at the 10.136 slm. 21806~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1807536 80988~|~1~|~1~|~01/ERD~|~Earmark funds to be used for all eligible work signal work at an 80/20 fed/local funding split using available OPWC funds for the local participation. The earmark can then be expended at 100% using TRC when all OPWC funds have been exhausted. 109357~|~1~|~2~|~02/IMS~|~Rehabilitate the Bridge that carries SR 28 over I-275 by overlaying the deck, replacing the barrier and replacing the Vandal Protection Fence. 109357~|~1~|~1~|~01/SAF~|~This plan split includes all work associated with the safety project that will improve the intersection of SR-28 & Old 28, including the creation of a slip ramp from Old 28 to I-275. 109357~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 105170~|~1~|~1~|~01/IMS~|~Minor bridge work. 105170~|~1~|~2~|~02/NHS~|~Minor bridge work. 105170~|~1~|~3~|~03/STR~|~Minor bridge work. 122239~|~1~|~1~|~01/SAF/PC~|~Expand culvert on West Avenue to include a sidewalk and high-visibility crosswalks for access to Plain City Elementary. 112935~|~1~|~1~|~01/S<2~|~Marion Urban Area Plan Split: MAR-95-17.19-18.31 112935~|~1~|~2~|~02/STR~|~Rural Plan Split: MAR-95-22.89-24.32 MAR-309-22.77-26.88 122661~|~1~|~1~|~01/NFP~|~Bridge work on various structures in District 5. 110980~|~1~|~1~|~01/IMS~|~Replace headwall; Replace last 20 outlet pipe; regrade and stabilize embankment 110980~|~1~|~2~|~02/STR~|~Jack and bore new pipe for WAR-123-2089. 96860~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail on various county roads within Lorain County. 116302~|~1~|~1~|~01/STR~|~Chipseal project 107298~|~1~|~1~|~01/NFP~|~Split for sign structure repair work. 107298~|~1~|~2~|~02/NFP~|~Split 2 for sign support repair due to collision on IR-77 SB north of Pleasant Valley Rd. 107298~|~1~|~3~|~03/NFP~|~Split 3 for sign support repair due to collision on IR-90 EB at Babbitt Road. 107748~|~1~|~1~|~01/S<2~|~Work on all four signals is in this plan split. Work in inside urban areas but outside of municipalities. Federal urban STP funds. 100% federal funds provided by the District. No local funds. 108631~|~1~|~1~|~01/SAF~|~Funding split for Active Trans. / SRTS 116918~|~1~|~1~|~01/S>2~|~Bridge painting & Deck overlay 116570~|~1~|~8~|~08/NFA~|~Waterline relocation. Erie County portion. US 6 11.341 to 15.326. 116570~|~1~|~1~|~01/SAF~|~Roundabouts. 116570~|~1~|~3~|~03/S50~|~Reconstruction of pavement, resurfacing and widening. 116570~|~1~|~4~|~04/ENH~|~Pedestrian Shared Use Path 116570~|~1~|~6~|~06/BRO~|~Bridge rehab, railing and fencing. 116570~|~1~|~2~|~02/SAF~|~NHS Roundabout. 116570~|~1~|~5~|~05/ENH~|~Pedestrian Shared Path on the NHS. 116570~|~1~|~7~|~07/BRO~|~Bridge Rehab NHS, Bridge Railing & Fence 100856~|~1~|~1~|~01/IMS~|~Smooth seal IR 70 in Montgomery County SLM 15.53 to 17.34. 124101~|~1~|~1~|~01/S5K~|~Bridge replacement project. VIN 683 0.35 (SFN 8203423). 114869~|~1~|~1~|~01/NHS~|~Fine graded polymer. 88850~|~1~|~1~|~01/STR~|~01/STR/PV/ - District Preservation 4PF7 (80% federal STP) / 4PS7 (20% state) - No cap - Resurfacing on SR53 from slm 0.51 to 11.63. 98003~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2020. 105256~|~1~|~1~|~01/NFA~|~Plan split for bridge removal work 111504~|~1~|~1~|~01/STR~|~Slide repair. 111176~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Replacement of the superstructure and repairs on the substructure of SFN 6005586 87378~|~1~|~1~|~01/STR~|~Rehab by replacing deficient deck with minimum road work (approach) on SFN 1100661 CHP SR 29 31.42 over Little Darby Creek, 0.57 miles East of State Route 4. 119339~|~1~|~1~|~01/IMS~|~Resurfacing. 119339~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance 106745~|~1~|~1~|~01/NFA~|~ODNR culvert work in Shawnee State Forest. 96283~|~1~|~1~|~01/S<2~|~Resurfacing of SR-123 (Central Avenue) from Dayton Oxford Road to west of Business Parkway. 109317~|~1~|~1~|~01/NFP~|~Reconstruction of intersection 119074~|~1~|~1~|~01/MPO/SYC~|~Construction of sidewalk along School Road (Township corp. limit to Stewart Elementary) and Solzman Road (School Road to East Kemper Road). 119074~|~1~|~2~|~02/NFA~|~100% locally funded GCWW utilities items 84208~|~1~|~1~|~01/SAF~|~Raised pavement marker (RPM) contract for FY 2014. Various routes and sections in D-10. 100% State. 109034~|~1~|~1~|~01/CMQ~|~Work to construct an all purpose trail that is eligible for federal-aid 98669~|~1~|~1~|~01/STR~|~LAW CR 10A- 00.91 (SFN 4432436) 85266~|~1~|~1~|~01/BRO~|~4801539 LUC SR25 7.92 Intersect: Norfolk Southern 85266~|~1~|~2~|~02/NFP~|~Added bike path. 85266~|~1~|~4~|~04/NFA~|~Plan split for utility conduit - To be paid by utility - Century Link 85266~|~1~|~5~|~05/NFA~|~Plans split for utility conduit - To be paid by utility - Level 3-Fiber Optic 85266~|~1~|~3~|~03/NFA~|~Plan split for utility conduct. To be paid by the utility - Ameritech 110285~|~1~|~1~|~01/NFA~|~Resurfacing HAS-258 from SLM 0.00 to 3.02 and TUS-258 from SLM 16.55 to 20.90. 110285~|~1~|~2~|~02/STR~|~Resurfacing TUS-258 from SLM 20.90 to 21.23. 110285~|~1~|~3~|~03/S<2~|~Resurfacing TUS-800 from SLM 7.83 to 9.13 (US 250). 104262~|~1~|~1~|~01/STR~|~Bridge repair on FAY-62-22.78 over N Fork Paint Creek. SFN 2401541 123650~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. 80110~|~1~|~1~|~01/IMS~|~Tentative split for unfunded major rehab work on FRA-71 95147~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ "- District Preservation Funding 4PS7 (100% State) - No CAP - District Wide Contract for Annual RPM replacement (3 year cycle) 124784~|~1~|~1~|~01/STR~|~Plan split for Conduit Replacement. 106882~|~1~|~1~|~01/NFP~|~2 year lighting contract in ATB, MAH and TRU Counties. 106882~|~1~|~2~|~02/NFP~|~LED luminaire upgrade. 102747~|~1~|~1~|~01/IMS~|~This plan split is for bridge rehab on the Interstate route. 105408~|~1~|~1~|~01/S>2~|~Scour repair on large urban bridge. 108918~|~1~|~1~|~01/NFP~|~Repair of structure due to a collision 97980~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 102911~|~1~|~1~|~01/STR~|~ROS 207 9.32 culvert replacement 110324~|~1~|~1~|~01/NHS~|~ Replace deck on existing concrete I-beam bridge BEL-7-1152 (SFN 0700223). Project will also replace the bearings and expansion joints. The substructure units will be repaired. The project will also repair the deck and wearing surface of structures BEL-7-1187 (SFN 0700312) and BEL-7-1279 (0700339). 124657~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded scope. 123966~|~1~|~1~|~01/IMS~|~emergency drainage structure repair. 89443~|~1~|~1~|~01/IMS~|~Guardrail Maintenance/Repair 100409~|~1~|~1~|~01/NFP~|~Expanding Millennium Blvd SE by 3000 feet. 20742~|~1~|~1~|~01/STR~|~Brdg Replacement. 0.04 MI. S OF TR75 (DRY RUN RD) 7302347 SCI SR73 4.28 Intersect: Dry Run80 Fed/20 State. 01/STR/BR/State 93969~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2017 108866~|~1~|~1~|~01/SAF~|~Mill and fill NB I-75 from the 7th St overpass to the Findlay St bridge overpass. 116144~|~1~|~1~|~01/SAF~|~"01/SAF/PV" - RPM replacement 121753~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 110480~|~1~|~1~|~01/SAF~|~Safety funds Plan split 107164~|~1~|~1~|~01/SAF~|~Plan split 96290~|~1~|~1~|~01/NHS~|~Bridge (SFN# 7100248) is on Rozelle Creek Rd but is part of US 23 SLM 4.97. 99450~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% State funds from the District Preservation Program 4PS7. 121547~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m. 100377~|~1~|~1~|~01/STR~|~Work on SR 18 in Hancock County from the Wood County line to the Fostoria Urban Area Boundary at TR 262 which is at 6.46. Federal and state funds from the District Preservation Program budget. No local funds. 100377~|~1~|~2~|~02/S<2~|~Work on SR 18 in Hancock from the Fostoria Urban Area Boundary at TR 262 which is at 6.46 to the west City of Fostoria corporation limits at 6.82. Federal and state funds from the District Preservation Program budget. No local funds. 84615~|~1~|~3~|~03/IMS~|~District wide Small Culvert Rehab/Replacement project. Rehabilitate culvert BUT-75-0390 (Pave invert and line portions) 84615~|~1~|~2~|~02/NHS~|~District wide Small Culvert Rehab/Replacement project. Rehabilitate culvert BUT-4-1249 (pave invert) 84615~|~1~|~1~|~01/STR~|~District wide Small Culvert Rehab/Replacement project. Replace culverts BUT-126-0650 and BUT-126-0999. Rehabilitate culverts BUT-126-0920 (pave invert), BUT-127-1681 (new invert) and BUT-127-1810 (pave invert). 114001~|~1~|~1~|~01/SAF~|~Install new/upgrade existing pavement markings on various county roads in Clinton County. 107128~|~1~|~1~|~01/NHS~|~Urban Paving - City of Cincinnati - Taft to Delta. 107128~|~1~|~2~|~02/NHS~|~Items to be covered 100% by the City of Cincinnati. 92193~|~1~|~1~|~01/STR~|~Includes all work associated with replacing bridge PRE-725-0332. 79663~|~1~|~1~|~01/IMS~|~90% federal/10% state resurfacingFRA-70: 11.15-14.2501/IMS/PV/ 79663~|~1~|~3~|~03/IMS~|~Pavement Markings & RPMs 100% State 79663~|~1~|~2~|~02/IMS~|~90% federal and 10% state minor workAsphalt overlays:FRA-70-1178 (2504707) SULLIVANTFRA-70-1198 (2504723) US 62FRA-70-1205 (2504731) CSX RRFRA-70-1223 (2504758) MOUND ST RAMPFRA-70-1241 (2504618) GLENWOODFRA-70-1248 (2504634) CYPRESSFRA-70-1282 L/R (2504642/2504669) SOUDERFRA-70-1301 L/R (2504677/2504766) SR315Asphalt overlay & deck patching:FRA-70-1121 (2504588) BROAD STFRA-70-1149 (2504693) STATE SCHOOL ACCESS 116296~|~1~|~1~|~01/STR~|~Chipseal project. 105818~|~1~|~1~|~01/IMS~|~Split for painting interstate bridges 105818~|~1~|~2~|~02/NHS~|~Split for painting NHS bridges 98596~|~1~|~1~|~01/S<2~|~Slide at OTT-2-18.40 WB. 95512~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-SR 79-06.21 to 11.47 93223~|~1~|~1~|~01/STR~|~Culvert replacement project. HOC 180 10.98. Rural other federal aid funded 80 federal/20 state. 117605~|~1~|~1~|~01/NFA~|~Bridge replacement project .MEG TR 126 0.579, SFN 5342600. Funded 100% Federal. 96969~|~1~|~1~|~01/IMS~|~Spot paving on various routes in POR, STA and SUM counties. 115072~|~1~|~1~|~01/ENH~|~Created for J&C Involvement 107168~|~1~|~1~|~01/SAF~|~Plan split 122826~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAC 4CD7). Construction phase cap is $1,492,405 and requires a 20% match (TRC) 97125~|~1~|~1~|~01/SAF~|~Plan split for all lighting maintenance work in the project 120033~|~1~|~1~|~01/STR~|~Superstructure replacement 121123~|~1~|~1~|~01/STR~|~Added bridge plan split. 122285~|~1~|~1~|~01/NHS~|~Plan Split for work associated with the installation of dynamic message signing and queue warning systems with TSMO funding 114233~|~1~|~1~|~01/NHS~|~Bridge repair from vehicle strike. 118771~|~1~|~1~|~01/NHS~|~added plan split. 118771~|~1~|~2~|~02/NHS~|~added plan split for bridges. funded by major bridge. 118771~|~1~|~3~|~03/NHS~|~added plan split for non major bridge 107311~|~1~|~1~|~01/NFA~|~The City will completely reconstruct and widen Hoyle Ave from Kettering Ave to Dixie Highway 124399~|~1~|~1~|~01/STR~|~Plan split for resurfacing of SAN-19 between SLM 0.696 to SLM 4.432 124399~|~1~|~2~|~02/S5K~|~Plan split for resurfacing work on SAN-19 between SLM 4.432 to SLM 5.286 123664~|~1~|~1~|~01/NFP~|~annual culvert FY32 112122~|~1~|~1~|~01/IMS~|~Demolition of 5 buildings. 104775~|~1~|~1~|~01/STR~|~Resurface on County rural road. 87297~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 133 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 96200~|~1~|~1~|~01/NFA~|~Application of 1.5 inches of asphalt overlay, installation of a 3 inch topsoil berm against new pavement with seed, fertilizer, and mulch, application of thermoplastic pavement markings with silica sand for skid resistance, and full depth pavement repairs where needed. 123903~|~1~|~1~|~01/SAF~|~Plan split for safety eligible construction items. 111767~|~1~|~1~|~01/S<2~|~AC overlay without repairs on:SR 47 SLM 20.95 to 21.06 111767~|~1~|~2~|~02/STR~|~AC overlay without repairs on:SR 47 SLM 21.06 to 27.09 94451~|~1~|~1~|~01/BRF/CCEO~|~01/BRF/BR/CCEO" - County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP = $355,000.00 Federal (4B87) dollars @ 80% - Replacement of SFN 1631454 COS CR493 0.10 Intersect: Structure Creek; BR Eligible for Replacement: Length=50 SD/FO(1) SR=13.7 DSR=4 106160~|~1~|~1~|~01/STR~|~Landslide repair. MRG 669 17.23. DSR MRG-009. Rural other federal aid funded 80 federal/20 state. ER funds. 91156~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2017 herbicidal spraying. 116294~|~1~|~1~|~01/S<2~|~Chip Seal 116294~|~2~|~2~|~02/STR~|~Chip Seal 95361~|~1~|~1~|~01/NHS~|~Split for work on the Lorain Rd bridge: 1801325. To be funded at 100% state. 95361~|~1~|~2~|~02/BRO~|~Split for the Granger Rd bridge: 1802496. Work to be funded at 100% state. 117498~|~1~|~1~|~01/BRF/CCEO~|~Replacement of the existing superstructure. Upgrades to guardrail on bridge approaches. 99779~|~1~|~1~|~01/SAF~|~Intersection of SR4/US40/US68 at CR327 - realign and widen the US68 Southbound exit ramp H; Signalize the intersection of US68 Southbound exit ramp H and CR327; and widen the US40 and CR327 intersection to provide the required auxiliary lanes and change lane use assignments for optimum signal operations. 102936~|~1~|~2~|~02/STR~|~STP Rural AC Overlay without Repair (WAY-3-20.16 to 25.74) 102936~|~1~|~1~|~01/S<2~|~STP < 200000 AC Overlay without Repair (WAY-3-19.62 to 20.16 / 25.74 to 26.13) 112960~|~1~|~1~|~01/STR~|~FAY-22 from 0.00 to 6.26 121833~|~1~|~1~|~01/CMQ~|~Plan Split for MPO funded CMAQ funds 100990~|~1~|~1~|~01/NHS~|~AC Overlay with Repairs on US 35 SLM 15.07 to 18.59 120459~|~1~|~1~|~01/BRF~|~All work in the project to replace the bridge 117973~|~1~|~1~|~01/STR~|~Landslide repair project. MOE SR 78 8.30. 100748~|~1~|~1~|~01/STR~|~ER landslide repair on JEF-213 90794~|~1~|~1~|~01/S>2~|~Demolition of the existing bridge and construction of a new bridge with five 12' lanes and two 10' sidewalks, including ADA compliant wheelchair ramps. Webster Street Bridge over the Mad River. 109214~|~1~|~1~|~01/STR~|~2018 Operations Chip D1 102840~|~1~|~1~|~01/S>2~|~This plan split is for signal work in urban area. 102840~|~1~|~2~|~02/S>2~|~Preemption to be paid at the City's expense. 122410~|~1~|~1~|~01/S>2~|~Lighting upgrades 111621~|~1~|~1~|~01/STR~|~Intersection upgrade at SR 158 and Coonpath Road. 84621~|~1~|~2~|~02/ENH/TCE~|~Plan Split for scenic beautification and landscaping items for sfn# 7804136 over Walnut Creek in the City of Cortland, Trumbull County, Ohio. 84621~|~1~|~1~|~01/BRO/TCE~|~Replacement and SFN# 7804136 over walnut creek, in the City of Cortland, Trumbull County, Ohio. 98980~|~1~|~1~|~01/MPO~|~Resurfacing W Federal from Phelps St to Market St, E Federal St from Market St to Walnut St, and Commerce St from 5th Ave to Federal St. 123748~|~1~|~1~|~01/STR~|~Plan Split for STP Rural 99336~|~1~|~1~|~01/NHS~|~Installation of median turns to improve access to Fabens Park. 92838~|~1~|~1~|~01/NFP~|~Culvert replacements on various routes in Mahoning County, Ohio. CFN 500450040 MAH-45-1.997, CFN 50045230 MAH-45-6.483, CFN 500460260 MAH-46-6.115, CFN 501640220 MAH-164-6.659, CFN 505340310 MAH-534-7.625, CFN 502240150 MAH-224-7.041 103138~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY30 Construction Engineering Services 103138~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY31 Construction Engineering Services 117201~|~1~|~1~|~01/S5K~|~Installation of sidewalks 110244~|~1~|~1~|~01/NFP~|~Construction of new local road. 117126~|~1~|~1~|~01/S>2~|~This plan split includes all work associated with widening North Fairfield to provide five lanes 117126~|~1~|~2~|~02/S>2~|~This split includes all work associated with constructing the sidepath on this project 90434~|~1~|~3~|~03/S<2~|~50% City of Wooster / 50% District Allocation Items 90434~|~1~|~1~|~01/S<2~|~Pavement Rehab "Urban" - 80/20 - District Allocation/City of Wooster 90434~|~1~|~2~|~02/S<2~|~Priority System Pavement within city of Wooster. No Local participation 90434~|~1~|~4~|~04/S<2~|~100% City of Wooster / Curb Ramps 108774~|~1~|~1~|~01/S<2~|~Tunnel repairs, trailhead, and trail work. 108774~|~2~|~2~|~02/BRO~|~Trestle bridge work. 98918~|~1~|~1~|~01/NFP~|~Bradner preserve 106785~|~1~|~1~|~01/S>2~|~Work to repair/resurface Scranton Road from Sackett Rd to Fairfield Ave that is eligible for federal-aid. 106785~|~1~|~2~|~02/NFP~|~Work to repair/resurface Scranton Road from Sackett Rd to Fairfield Ave that is not eligible for federal-aid. 123011~|~1~|~1~|~01/NHS~|~Districtwide signal installation and repairs. 105299~|~1~|~1~|~01/STR~|~Herbicidal Spraying for CAR, COL, HOL, and TUS 109910~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded. 109910~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 113818~|~1~|~1~|~01/NFA~|~Bridge rehab to include replacement of prestressed beams and concrete rehab of abutment and piers. Replace guardrail and pave approaches. All work will be in the existing right of way and out of the water. 110361~|~1~|~1~|~01/MPO~|~Resurfacing of Sunnyside Road beginning 350' north of Jerusalem Rd and ending 800' north of the Norfolk/Southern grade crossing. 100418~|~1~|~1~|~01/NFA~|~Extension the existing Fieldstone Way, 650 feet west, maintaining existing roadway witdith and termination with a cul-de-sac at the Stonequarry Crossing Project 114684~|~1~|~1~|~01/S5K~|~Double Application Microsurfacing on various sections of CRA-19, WAY-3, and WAY-585 114684~|~1~|~2~|~02/STR~|~Double Application Microsurfacing on CRA-19 and WAY-585 88832~|~1~|~1~|~01/NHS~|~01/NHS/PV/ - District Preservation 4PF7 (80% federal NHS) / 4PS7 (20% state) - No cap - Resurfacing on US23 from slm 15.91 to 23.16. 88832~|~1~|~2~|~02/BRO~|~Bridge repair. Federal and state funds from the District Preservation Program budget. 118811~|~1~|~1~|~01/S50~|~Additional parking/bike line construction. 97017~|~1~|~1~|~01/NFP~|~Raised Pavement Markers. 85687~|~1~|~1~|~01/STR~|~Structure ReplacementSFN 6501567, PIC-56-31.57 over Salt Creek01/STR/BR/ 87042~|~1~|~1~|~01/NHS~|~priority system resurfacing includes pavement repairs, guardrail and pavement marking 102336~|~1~|~1~|~01/STR~|~Microsurfacing BEL-149 from SLM 24.44 to 30.85. 89478~|~1~|~1~|~01/S<2/NEWA~|~"01/S<2/PV/NEWA" - Local Funding LCATS 4TB7 (80% Federal) /City of Newark 4BG7 (20% Local) - CAP 4TB7 of $500,000.00 Federal; Safety CAP $182,500.00 4HJ7 (90% federal requiring 10% Local 4BG7 Match - All funding for Construction Phase only. City of Newark project to improve turn lanes, widen radius of roadway, upgrade traffic signal, replace sidewalk & curb ramps, repair and resurface pavement at the intersection of 30th Street and Church Street. 114172~|~1~|~1~|~01/NHS~|~Repair/rehabilitate bridge HAS-9-1778 (SFN 3400395) carrying SR 9 over Conotton Creek. 87732~|~1~|~3~|~03/S<2~|~Repair of precast box beam bridge joints along with asphalt overlay and waterproofing on SFN 5710103 MOT 725 5.79 on Tributary of Twin Creek. 87732~|~1~|~2~|~02/S<2~|~Resurfacing of the existing Roadway with asphalt concrete on SR 725 from straight line mileage 3.81 to 6.76. Segment length 2.95 = 6.78 total lane miles. 87732~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete on SR 725 from straight line mileage 0.00 to 3.81 segment length = 3.81 total lane miles = 7.62 84286~|~1~|~1~|~01/S>2~|~80/10/10 fed/state/local funding split for work that is eligible for Urban Paving funds as modified by the District. 84286~|~1~|~2~|~02/S>2~|~Split for non-urban paving eligible items other than curb ramps funded with 100% OPWC money. 97945~|~1~|~1~|~01/STR~|~SR508 (OC 000) SLM 1.29 to SLM 9.46 resurface the existing roadway with asphalt concrete (2.00 in). 104612~|~1~|~1~|~01/MPO~|~Rehab of two structures in the City of Warren. 101335~|~1~|~1~|~01/BRO~|~Plan split for all work associated with WOO-23-2083 bridge replacement 108454~|~1~|~1~|~01/MPO~|~Resurfacing of Olde Eight Rd from Boston Heights North Corp Limit to Highland Rd (south intersection). 108454~|~1~|~2~|~02/S>2~|~100% county items for roadway widening. 123849~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 110568~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funds - 4PF7 (90% Federal ) / 4PS7 (10% State ) - No CAP - Installation of culvert liners on IR 70 in portions of Licking and Muskingum Counties 91350~|~1~|~1~|~01/BRO~|~Bridge replacemnt of SFN 7800274 West Market Street (6.88) 91350~|~1~|~2~|~02/NHS~|~Bridge rehabilitation for SFN 7800541 Eagle Creek Road and SFN 7800398 North Leavitt Road over SR5 97154~|~1~|~1~|~01/S>2~|~Stark County Engineer 122987~|~1~|~1~|~01/MPO~|~Construction of Sidewalk at SR48 and Butterworth 109736~|~1~|~1~|~01/S>2~|~plans split for the large urban sections of SR 32 109736~|~1~|~2~|~02/NHS~|~plan split for the small section of SR 32 in the project that is NHS 95128~|~1~|~1~|~01/NFP~|~District wide herbicidal spray project. 88929~|~1~|~1~|~01/NHS/YOU1~|~Resurfacing US 422 from 5.32 to 7.10, split corp, this half in the City of Youngstown, 80/20 split. 88929~|~1~|~3~|~03/NHS/CAMP~|~Resurfacing US 422 from 5.32 to 7.10, split corp, this half in the City of Campbell, 80/20 split. 88929~|~1~|~2~|~02/NHS/YOU2~|~Resurfacing US 422 from 5.06 to 5.32 and 7.10 to 7.58, entirely in the City of Youngstown, 80/20 split. 109441~|~1~|~1~|~01/S>2~|~Roadway improvements to include resurfacing, new storm sewer and minor bridge rehab. 109441~|~1~|~2~|~02/CMQ~|~Construct left turn lane. 109441~|~1~|~3~|~03/SAF~|~100% Local split 110123~|~1~|~1~|~01/S>2~|~Urban Paving plan split 123686~|~1~|~1~|~01/IMS~|~plan split for interstate locations 99591~|~1~|~1~|~01/SAE~|~Upgrade pavement markings on various Richland County roads. 8743~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 1800450; CUY-006-0257 119885~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-D 110973~|~1~|~1~|~01/NFP~|~Rehabilitation of Bridge WAR-TR 52-0402 (SFN: 8334773) by replacing the existing superstructure with a new prestressed composite concrete box beam superstructure and performing minor substructure repairs. 117327~|~1~|~1~|~01/NFA/LCEO~|~Replacement of structure (SFN 4530365) carrying Wolford Road over Rocky Fork 106230~|~1~|~1~|~01/CMQ~|~Construction of Southbound left turn lane along SR-170 at Dobbins Road, in Poland Township, Mahoning County, Ohio. 106230~|~1~|~2~|~02/BRO~|~Concrete overlay of MAH SR170 8.02 structure. SFN# 5004020. 100591~|~1~|~1~|~01/STR~|~Resurfacing CAR-39 from TUS Co. Line to Dellroy SCL and Carrollton to SR 524 including fine graded polymer asphalt overlay, pavement repairs and pavement markings. 107057~|~1~|~2~|~02/STR~|~Bridge rehab on NOB SR 83 0.03 (SFN 6101445). 107057~|~1~|~1~|~01/STR~|~Bridge replacement project on NOB SR 78 1.09 (SFN 6101054). Rural other federal aid funded 80 federal/20 state. 94717~|~1~|~2~|~02/SAF~|~construction engineering for left turn lane from foster maineville to butterworth and improved sight distance exiting butterworth. 94717~|~1~|~1~|~01/SAF~|~add left turn lane on foster maineville road to butterworth road and improved sight distance exiting butterworth road 123051~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 124607~|~1~|~1~|~01/S5K~|~Rehabilition of SFN3000575. 117072~|~1~|~1~|~01/STR~|~Split for bridge work 124894~|~1~|~1~|~01/IMS~|~Plan Split for slope and drainage repair on interstate. 114900~|~1~|~1~|~01/S<2~|~Resurfacing. 114900~|~1~|~2~|~02/STR~|~Resurfacing. 101798~|~1~|~1~|~01/NHS~|~Replacing linked structure > 20' span. 101798~|~1~|~2~|~02/STR~|~Superstructure replacement of linked structure > 20' span. 94065~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR 85 W 3.80, SFN 5832896. Funded through the Ohio Bridge Partnership Program 100% federal. 122011~|~1~|~1~|~01/STR~|~Road widening 100827~|~1~|~2~|~02/NHS~|~Funding split to rehab the WAR-73-1458 bridge that carries SR 73 over the Little Miami River. 100827~|~1~|~1~|~01/NHS~|~Replace Bridge WAR-73-1462 over Corwin Nixon Rd and the Little Miami River Bikepath. 108486~|~1~|~1~|~01/IMS~|~Tree clearing on Interstate routes 108486~|~1~|~2~|~02/NHS~|~Tree clearing on NHS routes 108486~|~1~|~3~|~03/S>2~|~Tree clearing on STP routes 108486~|~1~|~4~|~04/STR~|~Tree clearing on STP Rural routes 121082~|~1~|~1~|~01/NFA~|~PM (A) plan split. 103892~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 4.46. Rural other federal aid funded 80 federal/20 state. 114253~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 33 18.48-18.68. 122131~|~1~|~1~|~01/SAF/FCEO~|~Safety funded construction of a roundabout at the intersection of Williams Rd and Spangler Rd. 124524~|~1~|~1~|~01/IMS~|~Replace structures 91092~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 91092~|~1~|~3~|~03/IMS~|~See work locations for specific bridge work. 91092~|~1~|~2~|~02/NHS~|~MED-224-15.61 to 16.36 95767~|~1~|~1~|~01/NHS~|~SAN-6 from SLM 6.78 to 12.99 91301~|~1~|~1~|~01/NHS~|~Slide Repair 108930~|~1~|~1~|~01/SAF/CAMB~|~City of Cambridge SRTS Funding - 4SC7 (80 Federal) / LNTP (20% TRC) - Replacement of sidewalks, curb ramps, and crosswalks. 112036~|~1~|~1~|~01/MPO~|~Multi-use path on Olentangy Trail from Northmoor to Clinton Como. 114922~|~1~|~1~|~01/S>2~|~Resurfacing. 100859~|~1~|~2~|~02/S<2~|~HIG 50 11.50-11.85 100859~|~1~|~3~|~03/NHS~|~HIG 50 11.85-12.27 100859~|~1~|~1~|~01/NFA~|~D09 GAP FY22 100684~|~1~|~1~|~01/STR~|~Microsurfacing TUS-800 from SLM 30.54 to SLM 34.91 114895~|~1~|~1~|~01/S5K~|~Resurfacing. 89404~|~1~|~1~|~01/SAF~|~Project involves improving the intersection of Bramble Ave and Plainville Rd from an existing four leg offset signalized intersection with 2-4 lanes of traffic in each direction to a single lane roundabout with single lane approaches and departures. Improvements include new pavement, curb and gutter, storm sewers, sidewalks, and utility relocation. 102869~|~1~|~1~|~01/S<2~|~Plan Split for STP<200000, Marion, MAR-423 102869~|~1~|~2~|~02/STR~|~Plan Split for STP Rural, MAD-40, MRW-19, MRW-61, PIC-762 113086~|~1~|~1~|~01/IMS~|~Resurfacing. 113086~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance > 20' span. 113086~|~1~|~3~|~03/IMS~|~Minor work on state bridges. 91607~|~1~|~1~|~01/NHS~|~Replace existing deck on two bridges (TUS-250-2289 L & R. SFNs 7900694, 7900724) and paint/replace existing steel beams. Convert abutments to semi-integral and raise bridge if new steel is being used without impacting profile on US 250. Also, provide new approach slabs. 101435~|~1~|~3~|~03/S>2~|~100% Village of Sunbury items 101435~|~1~|~1~|~01/NHS~|~AC overlay on DEL-36-18.49 to 21.74 101435~|~1~|~2~|~02/S>2~|~AC overlay and FGP overlay on FRA-62-31.79 to 33.70; FRA-605-1.89 to 3.17; DEL-36-21.74 to 22.25; DEL-37-21.94 to 23.08 115634~|~1~|~1~|~01/SAE~|~Guardrail Material on LUC-24 119257~|~1~|~1~|~01/S5K~|~Resurfacing. 119257~|~1~|~2~|~02/STR~|~Resurfacing. 82755~|~1~|~1~|~01/NFA~|~Relocation of sanitary line at Summit County garage, Boston Heights, Summit County, Ohio. 82755~|~1~|~2~|~02/NFA~|~Factilities Split 110790~|~1~|~1~|~01/NFP~|~Landslide repair 109371~|~1~|~1~|~01/MPO~|~Tie replacement, track gaging, surfacing, crossing improvements, rail joint replacement, and signal work. Track improvements will help increase the track speed on this section from 25 MPH to 40 MPH. 91811~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - Project Impact Advisory Council (PIAC) Funding 5PI7 (80% Federal) / 4PI7 (20% State) - CAP = $1,250,000.00 for CO; District to provide corresponding CE costs - MOT during bridge bridge rehabilitation on Gue-IR 70-12.32. 91811~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 1) 3001474 GUE IR70 12.32 Intersect: I-70 Over Sr 265; Not BR Eligible for Rehabilitation: Length=442 SD/FO(0) SR=87.6 DSR=5; 2) 3001504 GUE IR70 12.32 Intersect: I-70 Over Sr 265; Not BR Eligible for Rehabilitation: Length=442 SD/FO(0) SR=87.6 DSR=5 100432~|~1~|~1~|~01/MPO~|~Mill and fill 100432~|~1~|~2~|~02/MPO~|~Plan Split for 100% local items (encroachment removals) 117420~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 111524~|~1~|~1~|~01/MPO~|~MPO funded items 100543~|~1~|~1~|~01/SAF~|~Upgrade exisiting pavement markers on verious county roads 101616~|~1~|~2~|~02/STR~|~Microsurfacing MAD-56 0.00 to 4.69 101616~|~1~|~3~|~03/S<2~|~Microsurfacing MAD-56 4.69 to 6.19 101616~|~1~|~1~|~01/IMS~|~Microsurfacing MAD IR 70 0.00 to 8.96 99024~|~1~|~1~|~01/SAF~|~District wide raised pavement markers 113987~|~1~|~1~|~01/NFA~|~Created for J&C involvement 113106~|~1~|~1~|~01/STR~|~HIG 50 18.23-21.00 116673~|~1~|~1~|~01/STR~|~Resurfacing on SR 637 in Van Wert County from SLM 0.00 to 4.01 using district preservation funds (80% 4PF7 and 20% 4PS7) 113382~|~1~|~2~|~02/STR~|~Resurfacing including enhanced pavement markings and an 18" aggregate berm. 113382~|~1~|~1~|~01/S>2~|~Resurfacing including enhanced pavement markings and an 18" aggregate berm. 109294~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 163 0.475, SFN 5331293. 107920~|~1~|~1~|~01/SAF~|~Intersection improvements on US 224 at New Milford and Waterloo Roads. 107920~|~1~|~2~|~02/STR~|~Replacing culverts. 84460~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7843976 Curtis Middlefield Road Bridge over Swine Creek. 122308~|~1~|~1~|~01/SAF~|~New signal 119450~|~1~|~1~|~01/BRF~|~Off-System Eligible Bridge Superstructure Replacement 113116~|~1~|~1~|~01/NFP~|~Bridge Plans split 102129~|~1~|~1~|~01/NFA~|~The City is constructing road improvements, widening Johns Road from Manchester Road past Hi-Way Distributings facility and widening Manchester Road from Renninger Road to Vanderhoof. 96415~|~1~|~1~|~01/NHS~|~Culvert repair of a collapsed inlet at SLM 2.53 on US22 in Harrison County. 96634~|~1~|~1~|~01/IMS~|~Install DDMS at various freeway / freeway interchanges throughout the state. 87088~|~1~|~2~|~02/NFA~|~Installation of watermain, to be paid for 100% locally. 87088~|~1~|~1~|~01/BRF~|~ Project involves replacing the bridge crossing Norfolk & Southern's rail system, improving horizontal and vertical alignments associated with the bridge. The pavement section in this area will also be widened to improve safety. Improvements will provide the required vertical clearance from the railroad and update all safety features. Mauds Hughes Road: from 0.4 miles north of Princeton Road to 0.35 miles south of Millikin Road. SFN 0932817 Sponsor - Butler County 115097~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. 92195~|~1~|~1~|~01/NFA~|~This project includes pavement repair, resurfacing with fine graded polymer asphalt concrete and pavement markings within the Kelleys Island SP Campground, State Park and State Historic Monument. 85275~|~1~|~1~|~01/STR~|~Resurface SEN SR18 17.91-23.09 107413~|~1~|~1~|~01/IMS~|~Fine Graded Polymer AC Overlay on MIA IR 75 SLM 10.84 to 12.75MIA IR 75 SLM 12.75 to 13.72 107413~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 110610~|~1~|~1~|~01/S>2~|~Split for paving work on SR-21 110610~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 107486~|~1~|~1~|~01/NFA~|~The City will construct improvements to five different intersections that need widening, restriping or reconstruction within the City of Euclid. 103594~|~1~|~1~|~01/SAF~|~Bike path upgrades. 99208~|~1~|~1~|~01/STR~|~This split is for all pavement marking work. This split uses 100% HSIP funds SAC 4HB7. Funds needed after the SAC 4HB7 cap is reached will be provided by Defiance County. 88951~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6400841 PER US22 12.02 Intersect: Turkey Run: Not BR Eligible L=99' SD/FO(0) SR=81.2 DSR=5 88951~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1) 6400817 PER US22 7.63 Intersect: Panther Run: BR Eligible for Rehabilitation: L=73' SD/FO(1) SR=72.6 DSR=7; 110334~|~1~|~1~|~01/SAE~|~100% CEAO Safety guardrail funds 120272~|~1~|~1~|~01/SAF~|~Signal and crosswalk replacement utilizing Federal Safety funds as awarded through the SRTS Program (100% utilizing TRC). 109766~|~1~|~1~|~01/IMS~|~Fine graded polymer asphalt concrete overlay (1.00") 91115~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 111257~|~1~|~1~|~01/NFP~|~Pymatuning State Park resurfacing. 91824~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Bridge replacement of 6005438 MUS SR208 5.54 Intersect: Over N Br Symmes Creek; Not BR Eligibla: Length=16 SD/FO(1) SR=48.8 DSR=4 91824~|~1~|~2~|~02/BRF~|~"02/BRF/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6005551 MUS SR208 10.41 Intersect: Over Symmes Creek; BR Eligible: Length=49 SD/FO(1) SR=40.4 DSR=4 105081~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan Split 1 109512~|~1~|~1~|~01/NFA~|~Adding turn lanes for new Provia location north of Strasburg 105025~|~1~|~1~|~01/S>2~|~Repair embankment slip on PIC-674-10.2 using GSM FY2020 application, awarded funds 105025~|~1~|~2~|~02/S>2~|~Invert paving and repair of culvert (CSF 1974911) at SLM 10.35 116345~|~1~|~1~|~01/STR~|~conduits linked 87937~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7 (100% State) - No CAP - Replace Structure on 1) 3006557 GUE SR660 3.68 Intersect: Ditch and 2) 3006565 GUE SR660 4.11 Intersect: Ditch 103072~|~1~|~1~|~01/S>2~|~Mill and resurfacing on STP route. 113413~|~1~|~1~|~01/S>2~|~Partial depth replacement of the roadway surface as well as new thermoplastic lane traffic striping and raised pavement markers. 113413~|~1~|~2~|~02/S>2~|~Curb repairs - locally funded. 101413~|~1~|~1~|~01/STR~|~AC Overlay w/Rpr WAY 94 8.18 - 14.15. 101413~|~1~|~2~|~02/STR~|~Bridge Work:WAY-SR-94-11.149 SFN 8503974 ORRVILLE DITCHExpansion joint repair/replacement (048)Bridge railing upgrade/repair (061)WAY-SR-94-13.361 SFN 8504024 DITCHExpansion joint repair/replacement (048)Bridge railing upgrade/repair (061)131 - Deck Patching - Concrete 88733~|~1~|~1~|~01/IMS~|~Resurfacing / Mill & Fill 84301~|~1~|~4~|~04/NHS~|~80/20 fed/state split for culvert work on the NHS portion of the project at SLM 0.93. 84301~|~1~|~1~|~01/NHS~|~80/20 fed/state split for pavement work on the NHS portion of the project from SLM 0.00 to 2.75. 84301~|~1~|~2~|~02/S>2~|~80/20 fed/state split for pavement work on the urban STP portion of the project from SLM 2.75 to 4.05. 84301~|~1~|~3~|~03/STR~|~80/20 fed/state split for pavement work on the rural STP portion of the project from SLM 4.05 to 4.89. 113715~|~1~|~1~|~01/SAF~|~Install a single-lane roundabout at the intersection of Princeton and Maud Hughes Road 113715~|~1~|~2~|~02/BRO/BCEO~|~Replacement of SFN 0934755, which carries Princeton Road over Gregory Creek. 100% locally funded. 93987~|~1~|~1~|~01/NHS~|~Replace existing reinforced concrete deck on Bridge JEF-7-2810 (SFN 4101383) with a new deck. Replace approach slabs with new full-width approach slabs and replace backwalls. Also, Paint structural steel. 96695~|~1~|~1~|~01/STR~|~Plan split to cover costs associated with the bridge, appurtenances, and approach roadway. 103784~|~1~|~1~|~01/STR~|~Landslide repair. MRG 60 21.42. DSR MRG-001. 124580~|~1~|~1~|~01/IMS~|~Plan split for embankment stabilization and repair of broken back pipes 92786~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on CLA SR 4 from SLM 5.46 (IR 70) to SLM 11.34 (JCT of USR 40). 121266~|~1~|~1~|~01/STR~|~All work included in this split 99534~|~1~|~2~|~02/NHS~|~NHS Culvert: ASD-42-5.13 99534~|~1~|~1~|~01/STR~|~STP Rural Culverts: ASD-3-2.10, ASD-3-2.27 80735~|~1~|~1~|~01/NHS~|~SFN 6200540 OTT SR2 25.33 Intersect: County Rd 33 (Gypsum Rd) Left SFN 6200575 OTT CR33 25.33 Intersect: County Rd 33 (Gypsum Rd) Right 109060~|~1~|~1~|~01/ENH~|~Sidewalk project 109060~|~1~|~2~|~02/ENH~|~Sidewalk Project 109060~|~1~|~3~|~03/ENH~|~Sidewalk Project 104240~|~1~|~1~|~01/IMS~|~MAD 142 13.41 L/R over I-70 (SFN 4902823/4902793): Replace decks, parapets, and approach slabs. Paint structural steel 104240~|~1~|~2~|~02/STR~|~Resurfacing MAD SR 142 from 13.05 to 13.40 and 13.48 to 13.66 and MAD CR 7 from 1.88 to 2.00 96854~|~1~|~1~|~01/NFP~|~100% State Stop Bar Detection. All locations 94392~|~1~|~1~|~01/NHS~|~General System Resurfacing 102781~|~1~|~1~|~01/IMS~|~This plan split is for work on Interstate bridge. 102781~|~1~|~2~|~02/IMS~|~Plan split for reconstructing the exit ramps from PRE-70 to PRE-127 101828~|~1~|~1~|~01/NFA~|~Resurfacing of Columbia Road in the Village of Richfield. 122738~|~1~|~1~|~01/S5K~|~Funding split for MPO STBG scope items 95578~|~1~|~1~|~01/STR~|~Replace Bridge (twin 60" pipes) with a culvert (58"x91" concrete elliptical). LOR-162-00.45 Winston Creek 118258~|~1~|~1~|~01/BRF~|~Plan Split for 100% LBR funds 102357~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district. 121175~|~1~|~1~|~01/NFP~|~HS plans split. 98266~|~1~|~2~|~02/NHS~|~Urban System Resurfacing in the City of New Philadelphia of SR 416 from SLM 10.82 (US 250) to SLM 11.53 (SR 39), including asphalt resurfacing and pavement marking. 98266~|~1~|~1~|~01/S<2~|~Urban System Resurfacing in City of New Philadelphia of SR 416 from the S. Corp. Limit to SLM 10.82 (US 250) and from SLM 11.53 (SR 39) to the N. Corp. Limit. Work includes asphalt resurfacing and pavement marking. 98266~|~1~|~3~|~03/S<2~|~Urban System Paving in the City of New Philadelphia of SR 416. Eligible items include curb ramps and aux. pavement markings. Also includes all work on S. Broadway from Commercial Ave. to Howe Ave. (Part 6). 101824~|~1~|~1~|~01/NFA~|~The County is assisting the Coshocton Cty Port Auth with a road re-construction on Coshocton County Road 12 87853~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7. 95307~|~1~|~1~|~01/BRO~|~Replace deteriorated twin 11'-3" corregated metal pipe arches. SFN 1206842. 99870~|~1~|~1~|~01/MPO~|~Construct new Stark County Park District Nickel Plate Trail pedestrian bridge over Pleasant Valley Drive. 88770~|~1~|~1~|~01/SAF~|~Project includes lengthening the existing WB left turn lane from Kinsey to US-68, widening to provide a WB right turn lane from Kinsey to US-68, new curb and sidewalk, and replacing the existing span wire traffic signal with a mast arm system at the intersection of US-68 and Kinsey. 122386~|~1~|~1~|~01/S>2~|~Work to construct a 10? multi use path, cConnections to existing sidewalks, signage, crosswalk striping and signals 87440~|~1~|~1~|~01/STR~|~Culvert Replacement 97045~|~1~|~1~|~01/STR~|~All roadway work:ASD-003-00.00 to 5.94, 06.10 to 06.81, ASD-060-00.00 to 01.47 97045~|~1~|~2~|~02/STR~|~Bridge work on following structures:ASD-003-0254ASD-003-0337ASD-003-0411ASD-003-0529ASD-003-0620 11229~|~1~|~1~|~01/NFA~|~Unfunded railroad bridge project. 112483~|~1~|~1~|~01/MPO~|~Plan Split for MPO eligible work from Johnnycake Rd to Painesville SCL (Part 1-PID 112483). 112483~|~1~|~2~|~02/MPO~|~Plan Split for MPO eligible work from Painesville SCL to Mentor Ave (Part 2-PID 112476). 91465~|~1~|~2~|~02/S>2~|~Grove City urban paving and in urban func class areaFRA-104: 1.49-1.66, 1.68-1.73, 3.40-3.68, 3.71-4.08 91465~|~1~|~1~|~01/S>2~|~General system paving and in urban func class areaFRA-104: 0.00-1.49, 1.66-1.68, 1.73-3.40, 3.68-3.71, 4.08-6.53 114620~|~1~|~1~|~01/SAF~|~Safety Ramp Clear Funding -4HJ7 (90% Federal) / 4BC7 (10% State) - See CAP Comment - Installation of turn lane on WB off-ramp from IR 70 to SR 209. 116795~|~1~|~1~|~01/IMS~|~MOWING 100945~|~1~|~1~|~01/NHS~|~STA SR 619 from 15.73 to 16.44. 100945~|~1~|~2~|~02/S<2~|~STA SR 619 from 15.44 to 15.73. 100945~|~1~|~3~|~03/STR~|~STA SR 172 from 25.53 to 30.32STA SR 619 from 7.36 to 15.44. 114002~|~1~|~1~|~01/SAF~|~Install new raised pavement markers on various county road in Clinton County. 124766~|~1~|~1~|~01/NHS/GENE~|~Reconstruct roadway. 79463~|~1~|~1~|~01/BRO~|~Bridge replacement 91346~|~1~|~3~|~03/STR~|~General system paving and in the rural func class area.SLM 2.77-7.78 91346~|~1~|~1~|~01/S<2~|~General system paving but within the Marysville urban func class area.SLM 1.77-1.81, 2.09-2.77 91346~|~1~|~2~|~02/S<2~|~Marysville urban paving SLM 1.81-2.09 99200~|~1~|~1~|~01/SAF~|~Install a new traffic signal at the ramp intersection of IR 75 Northbound & Northwoods Blvd. (CR647) to mitigate congestion and improve traffic opertation. 99200~|~1~|~2~|~02/SAF~|~Preemption work to be installed with a new traffic signal at the ramp intersection of IR 75 NB & Northwoods Blvd. (CR 647) to mitigate congestions and improve traffic operation. This is at the 100% expense of the local. 105198~|~1~|~1~|~01/STR~|~plan split for the roadway work on the rural section:WAR-48: SLM 1.64-4.64 105198~|~1~|~2~|~02/S>2~|~plan split for the roadway work on Lrg Urban sections:WAR-48: SLM 0.30-1.64WAR-48: SLM 4.64-5.23 79792~|~1~|~2~|~02/IMS~|~Bridge Rehabilitation 79792~|~1~|~3~|~03/IMS~|~Asphalt Grindings and ONYX pavement treatment (100% State) 79792~|~1~|~1~|~01/IMS~|~Microsurfacing 100297~|~1~|~1~|~01/NHS~|~Microsurfacing of TRU SR 11 from 9.97 to 12.63, TRU SR 45 from 0.00 to 5.78, TRU SR 46 from 0.00 to 2.31 and 5.60 to 7.08. 105568~|~1~|~1~|~01/S>2~|~Columbus urban area plan split: DEL-37-23.08-23.17 DEL-257-0.00-0.77 DEL-745-2.57-4.00 DEL-750-0.00-0.98 DEL-42-6.27-6.45 FRA-745-0.34-0.49 FRA-745-0.61-0.65 FRA-745-0.71-0.96 FRA-40-0.00-0.46 FRA-40-3.18-4.02 FRA-40-4.33-4.39 FRA-40-4.43-4.52 FRA-62-31.65-31.79 FRA-62G-0.00-0.04 105568~|~1~|~2~|~02/STR~|~Rural plan split: DEL-37-23.17-29.08 DEL-229-0.30-6.52 DEL-22IC-0.00-0.20 DEL-656-0.00-4.69 DEL-745-4.00-7.03 FRA-665-5.18-6.99 105568~|~1~|~3~|~03/NHS~|~NHS plan split: DEL-23-5.13-5.45 DEL-23-7.41-8.39 DEL-23-14.23-14.27 DEL-23-14.37-16.10 DEL-36-12.45-12.70 DEL-36-12.81-12.83 105568~|~1~|~4~|~04/S<2~|~Delaware urban paving plan split: DEL-23-14.10-14.23 DEL-23-14.27-14.37 105568~|~1~|~5~|~05/S<2~|~Darbydale urban area plan split: FRA-665-4.26-5.18 106638~|~1~|~1~|~01/NFA~|~TAP grant for bike path along Front St floodwall in Portsmouth. 109452~|~1~|~1~|~01/NFP~|~Culvert repairs/replacements, includes ditch elimination on STA SR 619. 111118~|~1~|~1~|~01/STR~|~Repair Culvert 92671~|~1~|~1~|~01/MPO~|~Resurfacing CR 115 1.26 - 2.65 121196~|~1~|~1~|~01/NHS~|~Urban paving 122393~|~1~|~1~|~01/NFA~|~Plan split for ODNR Resurfacing work 101570~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Deck overlay and pier patching on GUE-22-7.36 (SFN 3000249). 101570~|~1~|~3~|~03/NHS/CAMB~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local) City of Cambridge - No CAP - Resurfacing on Gue-22-(7.36-7.50) inside the City of Cambridge 101570~|~1~|~1~|~01/ENH/CAMB~|~City of Cambridge TA Project - 4B37 (80% Federal) / 4BG7 (20% Local) TRC approved for 15% match - See CAP Comments - For sidewalks, lighting for Dewey Ave (US22) 105405~|~1~|~1~|~01/IMS~|~Bridge painting 93350~|~1~|~1~|~01/STR~|~Brdg replacement. On SR217, 2.16 miles east of SR141. 4402855 LAW SR217 2.17 Intersect: Big Ice Creek80 Fed/20 State. 01/STR/BR/State 90567~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split for all work using MPO STP funds. 113587~|~1~|~1~|~01/NHS~|~Replace small culverts. 93931~|~1~|~1~|~01/NFA~|~FY2015 Distirct wide raised pavement marker project 114860~|~1~|~1~|~01/IMS~|~Plan split for noise walls 96984~|~1~|~1~|~01/NFA~|~Reconstruciton of TR 1705 95436~|~1~|~2~|~02/IMS~|~various bridges SFNs: 8703183, 8703213, 8703272, 8703248, 8703302, 8703337, 8703450, 8703426 95436~|~1~|~1~|~01/IMS~|~WOO-75 from SLM 3.01 to SLM 11.18 124043~|~1~|~1~|~01/NFP~|~Plan split for highway maintenance mowing at various locations throughout the district. 121195~|~1~|~1~|~01/STR~|~Upgrade Traffic Signals 87122~|~1~|~1~|~01/NHS~|~Resurfacing a portion of SR 4 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 94799~|~1~|~1~|~01/STR~|~Bridge deck replacement project with substructure repair. WAS 821 6.56 (SFN 8405409). Rural other federal aid funded 80 federal/20 state. 22329~|~1~|~1~|~01/S<2~|~"01/STR/PV/COL" - Relocate CR 430 (Calcutta Smith Ferry Rd) from 0.3 mi east of CR 425 eastward for 0.80 mi to improve vertical and horizontal deficiencies. Includes guardrail, signing, striping, culverts. 95111~|~1~|~1~|~01/SAF~|~Safety funding for RTL at SB exit ramp at 270/Georgesville Rd 98462~|~1~|~1~|~01/NHS~|~HUR-250-15.51-19.84 Resurfacing 98462~|~1~|~3~|~03/SAF~|~Funding for center Line rumble stripes Outside of Fitchville. 98462~|~1~|~4~|~04/NHS~|~HUR US 250 1301Preventive Maintenance ?Expansion joint repair/replacement (048) ?Bridge railing upgrade/repair (061) Minor Rehabilitation ?Bridge railing upgrade/repair (061) 98462~|~1~|~2~|~02/NHS~|~HUR 250 0520:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 0528:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 0747:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 1301:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 1557:PERVENTIVE MAINTANCEHUR 250 1829:PERVENTIVE MAINTANCEHUR 250 1840:PERVENTIVE MAINTANCEHUR 250 1953:PERVENTIVE MAINTANCE/MINOR REHAB 109472~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades on MAH IR 680 at US 224. 105620~|~1~|~1~|~01/STR~|~Resurfacing 108856~|~1~|~1~|~01/SAF~|~Profile corrections on HAM US-50 including griding approach to bridge expansion joint and a mill and fill at the rear approach slab to the bridge. 86326~|~1~|~1~|~01/MPO~|~ Reconstruction and improvements to the intersection incuding total pavement replacement including curb, replace and repair sidewalk and replace the traffic signal at the intersection of Woodman/Dorothy Lane in the City of Kettering. 106120~|~1~|~1~|~01/S>2~|~Add sidewalks in the City of Dayton along the south side of Hillcrest Ave to Philadelphia Drive. 118943~|~1~|~1~|~01/SAF~|~All work included in this split. 97635~|~1~|~1~|~01/NFA~|~Build Sidewalk on east side of Buchholzer Blvd from mall entrance to Independence Ave. 100424~|~1~|~1~|~01/STR~|~PIK 104 (6.57-10.40) 100424~|~1~|~2~|~02/S<2~|~PIK 104 (10.40-10.64 & 11.36-12.66) 100424~|~1~|~3~|~03/STR~|~PIK 104 9.14 (SFN 6601022) 123073~|~1~|~1~|~01/SAF~|~Plan Split for Safety funded scope. 112909~|~1~|~1~|~01/MPO~|~Widening of SR 48 to provide additional thru lanes both NB and SB from Willow Pond Blvd. to north of Ridgeview/Saddle Creek. Construction of new sidewalk north of US 22/SR 3. Replacement of existing traffic signals. Addition of a second SB left turn lane from SR 48 to EB US 22/SR 3. 112909~|~1~|~2~|~02/SAE~|~Traffic signal replacement at SR 48 and US 22/SR 3, widening EB US-22 (west of SR-48) to provide dual EB left turn lanes and widening NB SR-48 (north of US-22) from US-22 to Towne Center Blvd to receive the dual EB lefts. 112909~|~1~|~3~|~03/SAF/WCW~|~Water line improvements being funded by Warren County Water. 113008~|~1~|~1~|~01/STR~|~Replace bridge CLI-28-1691 over East Fork Little Miami with a new structure. 113443~|~1~|~1~|~01/IMS~|~Roadway milling and resurfacing in the City of Miamisburg. 104329~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work 113330~|~1~|~1~|~01/SAF~|~Split for safety-related crosswalk improvements 86867~|~1~|~1~|~01/S<2/Chil~|~US50 Urban portion of Paving/Safety Project in Chillicothe Begin SLM 23.37 & terminate SLM 24.11Urban paving. 80% Fed/20% local match by ChillicotheFrom Elm Street (SLM 23.37) to Bridge Street (SLM 24.11) it is proposed to perform intersections improvment, safety corridor improvement, and turn lane addition on US50 within the City of Chillicothe from Elm Street to Bridge Street. 86867~|~1~|~5~|~05/S<2~|~This plan split is for additional work at the discretion of the District Deputy Director. 86867~|~1~|~2~|~02/SAF~|~US50 Plan split F/safety portion of project. Includes intersection improvements, turn lane addition, etc. From Elm Street (SLM 23.37) to Bridge Street (SLM 24.13) it is proposed to perform intersections improvment, safety corridor improvement, and turn lane addition on US50 within the City of Chillicothe from Elm Street to Bridge Street.90% Fed Safety funds/10% local match by Chillicothe02/SAF/PV/Chillicothe 86867~|~1~|~4~|~04/SAF~|~ODOT's Safety program shall assume and bear 100% of the cost of grinding located within the safety areas of the project. Includes Strain poles.On US50, safety portion begins approximately 456.37 ' from High St. and ends 1,149.02 from High St, then resumes 2,547.70' from High St. and ends at Mulberry St. 86867~|~1~|~3~|~03/S<2/Chil~|~City of Chillicothe shall assume and bear 100% of the cost of pavement grindings and parking lot stall markings. 88957~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Backwall rehabilitation on 1) 4503333 LIC IR70 11.04 Intersect: Ir70 Ovr Reservoir Feeder; BR Eligible for Rehabilitation: Length=73 SD/FO(1) SR=62.0 DSR=6; 2) 4503368 LIC IR70 11.04 Intersect: Ir70 Ovr Reservoir Feeder; BR Eligible for Rehabilitation: Length=73 SD/FO(1) SR=57.7 DSR=4; 3) 4503392 LIC IR70 11.93 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=138 SD/FO(1) SR=59.9 DSR=7; 4) 4503422 LIC IR70 11.93 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=138 SD/FO(1) SR=55.6 DSR=5; 5) 4503570 LIC IR70 15.01 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=106 SD/FO(1) SR=62.4 DSR=6; 6) 4503600 LIC IR70 15.01 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=106 SD/FO(1) SR=58.9 DSR=5; 88957~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7 (90% Federal)/4PS7 (10% State) - No CAP - Backwall repairs and approach slab work for 1) 4502884 Lic IR70 00.74L Intersect: over TR 36 Palmer Rd; Not BR Eligible for Rehabilitation: Length=165' SD/FO=0 SR=87.8 DSR=7; 2) 4502914 Lic IR70 00.74R Intersect: over TR 36 Palmer Rd; Not BR Eligible for Rehabilitation: Length=155' SD/FO=0 SR=87.8 DSR=7; 3) 2301598 Fai IR70 00.84R Intersect: Blacklick Creek; Not BR Eligible for Rehabilitation: Length=114' SD/FO=0 SR=86.3 DSR=7; 4) 2301563 Fai IR70 00.84L Intersect: Blacklick Creek; Not BR Eligible for Rehabilitation: Length=114' SD/FO=0 SR=92.6 DSR=7; 5) 2301628 Fai IR70 01.19L Intersect: over SR 256; Not BR Eligible for Rehabilitation: Length=177' SD/FO=2 SR=88.0 DSR=6; 6) 2301652 Fai IR70 01.19R Intersect: over SR 256; Not BR Eligible for Rehabilitation: Length=181' SD/FO=2 SR=86.0 DSR=6; 122679~|~1~|~1~|~01/SAF~|~Installing median cable barrier. 89190~|~1~|~1~|~01/S>2~|~Plan Split for SFN 0406635 ATB SR 531 0917 lift bridge over Ashtabula River. 99581~|~1~|~1~|~01/MPO~|~Resurfacing Tod Ave from Market St to Elm Hill Drive, and Resurfacing Atlantic Street from Mahoning Ave to Elm Rd using rubberized asphalt as well as new pavement marking and signs. Includes planing existing surfaces and adding asphalt leveling course prior to resurfacing. Includes incidental drainage work, ADA curb ramps; curb, linear grading behind curb and sidewalk repair where needed. 112287~|~1~|~1~|~01/NHS~|~2" Overlay with asphalt concrete, 2" mill and ill in areas with curb and gutter on: MOT-4 SLM 2.48 to 4.30 124495~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement. 97653~|~1~|~1~|~01/NFP~|~Construct new District 10 HQ Garage. Funded 100% state. 116120~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - 90% Federal and 10% State - resurfacing along IR 70 in MUS 116204~|~1~|~1~|~01/STR~|~Geotech repairs along BUT-126 105122~|~1~|~1~|~01/NHS~|~Double Microsurfacing of STA US 30 from 4.50 to 7.71 Microsurfacing of STA SR 44 from 13.68 to 14.16, STA SR 800 from 7.36 to 8.15. 105122~|~1~|~2~|~02/S>2~|~Microsurfacing of STA SR 800 from 3.62 to 7.36. 105122~|~1~|~3~|~03/STR~|~Microsurfacing of STA SR 44 from 19.39 to 23.21, STA SR 153 from 9.87 to 14.69, STA SR 183 from 0.00 to 3.55, STA SR 800 from 0.00 to 3.62. 102394~|~1~|~1~|~01/STR~|~Resurfacing. 102394~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 102394~|~2~|~3~|~03/STR~|~Resurfacing. 102394~|~2~|~4~|~04/STR~|~Minor bridge rehab, span 10 to 20'. 102394~|~3~|~5~|~05/STR~|~Resurfacing. 102394~|~3~|~6~|~06/S>2~|~Resurfacing utilizing major rehab funds. 102394~|~3~|~7~|~07/STR~|~Minor bridge work > 20' span. 102394~|~3~|~8~|~08/S>2~|~Minor bridge work 10' to 20' span. 102394~|~3~|~9~|~09/STR~|~Minor bridge work 10' to 20' span. 102394~|~1~|~10~|~10/NFA~|~Retroactive fuel price adjustment 89722~|~1~|~1~|~01/ENH~|~80/20 funding split using federal MPO Enhancement funding 89722~|~1~|~2~|~02/ENH~|~Work items using 100% local funding. 112727~|~1~|~1~|~01/NHS~|~Convert to semi integral, change parapet rail at MRW-314-20.71 117006~|~1~|~1~|~01/NHS~|~Split for bridge work on the NHS 115481~|~1~|~1~|~01/NFP~|~Split for non-PID related tasks for PID 112426 87220~|~1~|~2~|~02/BRO~|~It is proposed to replace the deficient structure (SFN 0100757). Project is 2.73 mile (0100757) north of the Brown County line. 87220~|~1~|~1~|~01/STR~|~It is proposed to replace the deficient structure (SFN 0100846). Project 4.29 mile (0100846) north of the Brown County Line. 80/20 106226~|~1~|~1~|~01/SAF~|~Reconstruct various signals in the City of Franklin. 113447~|~1~|~1~|~01/SAF~|~Upgrade traffic signal with mast arm poles, install back-plates, Install left turn flashing arrow, advanced detection for all directions, install additional signal heads, Implement leading pedestrian phase, with signal timing and pedestrian crossing improvements. 109976~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract for FY2025 in D8. Locations to be determined. 86667~|~1~|~1~|~01/ENH~|~Create observation deck on partial remnants of Ft. Steuben Bridge Pier #2 after the bridge is demolished. Project to construct safety railing around pier perimeter, set in place a pre-built pedetrian foot bridge, construct a parking lot, pave the access road and provide a memorial placard of the bridge. Will be part of the Steubenville Marina. 114691~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract in D8. Locations to be determined. 115394~|~1~|~1~|~01/BRO~|~Replace Court St. Bridge in Urbana over Town Branch 93933~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2017. Various routes and sections in D10. Funded 100% state. 102787~|~1~|~1~|~01/STR~|~Micro surface various STP Rural routes 102787~|~1~|~2~|~02/S<2~|~Micro surfacing various STP < 200K routes 102787~|~1~|~3~|~03/NHS~|~Micro surfacing various NHS routes 96386~|~1~|~1~|~01/SAF~|~Upgrade pedestrian signal facilities at the intersection of SR 66 and 7th Street. The project will install school zone flasher assemblies on SR 66. 105280~|~1~|~3~|~03/S<2~|~Chip seal on small urban route: SHE SR 29 SLM 19.99 to 20.31 105280~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal Aid routes: AUG SR 198 SLM 7.90 to 11.01, DAR SR 722 SLM 6.16 to 10.16. 105280~|~1~|~1~|~01/STR~|~Chip seal on rural routes: DAR SR 571 SLM 20.76 to 24.88, MER SR 707 SLM 16.65 to 19.43, MER SR 219 SLM 17.66 to 19.91, SHE SR 29 SLM 20.31 to 22.31 88779~|~1~|~2~|~02/NHS~|~Replace or rehab deteriorated backwalls/expansion joints/approach slabs District Wide. Include necessary structural steel repairs and bearing rehab on SFN 1203150 CLA US 68 1241. 88779~|~1~|~1~|~01/NHS~|~Replace or rehab deteriorated backwalls/expansion joints/approach slabs District Wide. Include necessary structural steel repairs and bearing rehab on SFN 1205641 CLA SR 334 0.86 and SFN 1203150 CLA US 68 1241. 114781~|~1~|~2~|~02/NHS~|~BUT-4-1816 bridge 114781~|~1~|~3~|~03/S>2~|~Bridge BUT-127-1087 114781~|~1~|~5~|~05/NFP~|~BUT-748-0032 bridge 114781~|~1~|~1~|~01/IMS~|~Project to perform minor maintenance bridge repairs on Interstate bridges BUT-75-0279L/R and HAM-75-1908R 114781~|~1~|~6~|~06/S5K~|~Plan split for the two BUT-122D in the area of Milddletown 114781~|~1~|~4~|~04/STR~|~BUT-122 bridge, and BUT-73 bridge 82263~|~1~|~1~|~01/SAF~|~District Allocation - NHS: RIC 30 4.07-9.13, RIC 309 6.15-9.04 110543~|~1~|~1~|~01/STR~|~Plan split for resurfacing a portion of BUT-744 115397~|~1~|~1~|~01/ENH~|~Construct Sidewalk. 107684~|~1~|~1~|~01/STR~|~Resurfacing on SR 117 in Allen County from the Lima Urbanized Area boundary at Hanthorn Road at SLM 23.04 to the Auglaize County Line. District preservation funds (80% 4PF7 and 20% 4PS7). 107684~|~1~|~2~|~02/S<2~|~Resurfacing of SR 117 in Allen County from the beginning of the project just east of Bowman Road at SLM 19.99 to the Lima Urbanized Area Boundary at Hanthorn Road at SLM 23.04. District preservation funds (80% 4PF7 and 20% 4PS7). No local funds. 107684~|~1~|~3~|~03/SAE~|~Centerline rumble strips on SR 117 in Auglaize County from the Allen County line to the Hardin County line. 100% federal funds from the District Preservation Program budget SAC 4PF7. 107684~|~1~|~4~|~04/SAF~|~Fix the superelevation of the shoulder of a curve on US 30 in Allen County from 19.45 to 19.71 to match the superelevation of the rest of the roadway. Safety Program funds 90% 4HJ7 and 10% 4BC7 until cap is reached then use District Preservation Program funds. 109352~|~1~|~1~|~01/SAF~|~Install median cable barrier on SR-126 from US-27 to I-75 as well as along the HCEO piece of Ronald Reagan between US-27 and I-275 95643~|~1~|~1~|~01/S>2~|~Roadway resurfacing including installation of ADA ramps. Adjustment of manholes and water valves, catch basin repairs/replacements CR 25A from Statler Avenue to Riverside Drive. 105315~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 2: Acquisition of parcels and structure demolition on the eastern approach to the new WHV. Fill and grade the eastern approach and construct new retaining walls where practical and where they can be constructed in a manner compatible with the design of the new WHV. 112603~|~1~|~1~|~01/NFP~|~The Seneca County TID will construct the Tiffin-Fostoria Connector Phase 1A 96743~|~1~|~1~|~01/NHS~|~Emergency Type A rock fall landslide repair. WAS 7 39.42. Funded 100% state. 77925~|~1~|~1~|~01/S>2~|~Bridge work associated with HAM-32-0575 (SFN 3102203). 77925~|~1~|~2~|~02/NHS~|~Plan split for bridges HAM-32-0014, SFN 3102068 and HAM-32-0127, SFN 3102076 97368~|~1~|~1~|~01/NHS~|~Landslide repair project. Locations TBD. 96595~|~1~|~1~|~01/NFA~|~Aggregate and pavement repairs, paving of Spencer Lake Wildlife Area. 101689~|~1~|~1~|~01/STR~|~Landslide repair. DSR# BEL-028 99501~|~1~|~1~|~01/NHS~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7 75442~|~1~|~1~|~01/STR~|~Brdg ReplacementProject is 0.31 miles east of CR 52 (Lenhart Rd). Project Description: It is proposed to replace the existing deficient structure no. 4002520 over a tributary of Holland Fork with a new structure and all necessary approach work. 4002520 JAC SR139 4.4 Intersect: Trib Of Holland Fork80 fed/20 state 01/STR/BR/State 88835~|~1~|~1~|~01/NHS~|~This funding split is for resurfacing on the NHS system (US 30). Funds are from the District Preservation Program. 92801~|~1~|~1~|~01/NHS~|~MOE 7 19.51, SFN 5600545. Bridge repairs and deck replacement. Federal 80%, State 20%. 117981~|~1~|~1~|~01/BRF~|~Bridge replacement. 122846~|~1~|~1~|~01/MPO/MACE~|~Resurfacing. 95505~|~1~|~2~|~02/NHS~|~100% local items 95505~|~1~|~1~|~01/NHS~|~85/15 funding split for resurfacing work. 95583~|~1~|~1~|~01/STR~|~ADA 136 5.87-9.39 95583~|~1~|~2~|~02/NHS~|~ADA 52 8.29-13.10 109189~|~1~|~1~|~01/NFP~|~POR TID to construct Streetsboro City Center. 112574~|~1~|~1~|~01/NHS~|~Bridge maintenance 112574~|~1~|~2~|~02/IMS~|~Noisewall repairs and/or reconstruction along interstate locations 112574~|~1~|~3~|~03/NHS~|~Noisewall repairs and/or reconstruction along NHS locations 116230~|~1~|~1~|~01/STR~|~FY 28 Overlay 121176~|~1~|~1~|~01/NFP~|~crack sealing plan split. 119230~|~1~|~1~|~01/NHS~|~All items of work associated with the resurfacing of US33. 119230~|~1~|~2~|~02/S>2~|~All items of work associated with resurfacing US35 within the Columbus Urban Area. 119230~|~1~|~3~|~03/S5K~|~All items of work associated with the resurfacing of US33I. 119230~|~1~|~4~|~04/STR~|~All items of work associated with resurfacing of US36 in the STP Rural Area. 91046~|~1~|~1~|~01/NFP~|~Overlay, joint repair and sealing of SFN 7602227 over STA-IR77, and Overlay, joint repair and sealing of SFN 7602243 over Cleveland Ave. 91761~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. GAL 775 4.74-4.75. Rural other federal aid funded 80 federal/20 state. 91761~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment. NHS route funded 80 federal/20 state. 91761~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment. Urban other federal aid funded 80 federal/20 state. 124427~|~1~|~1~|~01/MPO~|~Federal items. 111157~|~1~|~1~|~01/SAE~|~Split for safety upgrading of Type A anchor assemblies 100181~|~1~|~1~|~01/NHS~|~Work on North Main Street from Trenton to Bigelow. 80% federal funds from the City of Findlay large city budget with the 20% match provided being local funds provided by the City of Findlay. 100181~|~1~|~2~|~02/S<2~|~Work on Trenton from Main to Blanchard. 80% federal funds from the City of Findlay large city budget with the 20% match being local funds provided by the City of Findlay. 98276~|~1~|~1~|~01/NHS~|~Reactive Pavement Maintenance / GAP Project 101969~|~1~|~1~|~01/SAF~|~Apply rumble stripes to VIN 93 9.52-17.52. 100% State safety funds. 93501~|~1~|~6~|~06/IMS~|~Re-Deck of two structures in Medina County. MED-IR76-11.43 (L&R). 93501~|~1~|~5~|~05/IMS~|~Overhead D4 structures, see linked bridges. 93501~|~1~|~4~|~04/IMS~|~Mainline D4 structures, widening portion, see linked bridges. 93501~|~1~|~7~|~07/IMS~|~Replacement of of Cleveland Massillon Road structure (SFN#7705077) over IR76 in the City of Norton, Summit County, Ohio. 93501~|~1~|~2~|~02/IMS~|~Additional Capacity associated with the reconstruction of IR-76 from Medina County line to SR-619 (Wooster Road). Minor bridge work on SFN# 7705018. 93501~|~1~|~1~|~01/IMS~|~Reconstruction of four current lanes of IR-76 from Medina County line to SR-619 (Wooster Road). Minor bridge work to SFN# 7704895. 93501~|~1~|~8~|~08/IMS~|~Construction of camera's at Cleveland Massillon, Clark Mill and Barber Road. 93501~|~1~|~3~|~03/IMS~|~Mainline D4 structures, reconstruction portion, see linked bridges. 114153~|~1~|~1~|~01/NFA~|~Minor repairs and resurfacing of beach parking lots 124997~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP Rural roadway 121288~|~1~|~1~|~01/STR~|~Culvert replacement project on GAL325 16.16, CFN 1829887 and pave culvert invert on MEG 325 1.76, CFN 1824844. 123822~|~1~|~1~|~01/IMS~|~Bridge Hit repairs Type 2 Emergency 97612~|~1~|~1~|~01/NHS~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7 93769~|~1~|~1~|~01/STR~|~Reface abutments using anodes and pier piling encasements on SFN 0600725 AUG SR 65 1319 Auglaize River. 102831~|~1~|~1~|~01/IMS~|~This plan split is for Interstate signal work. 107496~|~1~|~1~|~01/STR~|~Resurfacing COL-39 102366~|~1~|~1~|~01/NFP~|~Split for crack sealing 105733~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7. 115745~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 (ODOT/City) portion of the urban paving resurfacing on GRE-42. 115745~|~1~|~2~|~02/NHS/XEN~|~Plan Split for the 100% Local funded items on resurfacing GRE-42 106223~|~1~|~1~|~01/CMQ~|~Bikepath Connector in the City of Franklin. 107843~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 83 0.40-0.44. DSR WAS-001. Rural other federal aid funded 100% federal ER funds. 117582~|~1~|~1~|~01/NFP~|~Resurfacing campgrounds in Caesar Creek State Park 92749~|~1~|~1~|~01/STR~|~7203152 SAN SR510 4.12 Intersect: Little Raccoon Creek 110641~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 in Defiance County from the Paulding County line at 0.00 to the Defiance Urban Area Boundary at Watson Road at 2.01. Federal and state funds from the District Preservation Program budget. No local funds. 110641~|~1~|~4~|~04/S5K/DEFI~|~100% city costs. 110641~|~1~|~2~|~02/S5K~|~Resurfacing on SR 66 inside the Defiance Urban Area but outside of the City of Defiance. Work on both sides of the road from the Defiance Urban Area boundary at Watson Road at 2.01 to where SR 66 enters the City of Defiance on the right side at 2.20 and then on the left side to where SR 66 on the left side until it enters the the City of Defiance at 3.05. The work also includes work on the right side of SR 66 from where it leaves the City of Defiance at 2.31 until it enters the City of Defiance at 2.39. Federal and state funds from the District Preservation Program budget. No local funds. 110641~|~1~|~3~|~03/S5K/DEF~|~Resurfacing on SR 66 in the City of Defiance. Work on SR 66 from where it enters the City of Defiance on the right side at 2.20 until it leaves the City of Defiance at 2.31 and again on the right side of the road from where it reenters the City on the right side at 2.39 to where SR 66 enters the City of the left side at 3.05 and then on both sides of the road from 3.05 to the end of the work at 3.39. Federal funds from the District Preservation Program budget with the non-federal match provided by the City of Defiance. 111164~|~1~|~1~|~01/NFP~|~Resurfacing at Delaware Alum Creek State Park 8809~|~1~|~1~|~01/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of 6000428 MUS US22 9.95 Intersect: Ditch #; Not BR Eligible for Rehabilitation: Length=15 SD/FO(2) SR=31.8 DSR=5 108730~|~1~|~1~|~01/NHS~|~Erosion repair project and unplug drainage structures. ATH 33 2.43-2.45 and 4.20-4.40. Funded 80 federal/20 state. 101207~|~2~|~2~|~02/NHS~|~AC overlay or fine graded polymer AC overlay on DEL-23-20.85-21.53, MAR-4-7.93-8.34, MAR-23-0.00-2.41 101207~|~1~|~3~|~03/S<2~|~AC overlay or fine graded polymer AC overlay on MAR-4-5.72-7.93, MAR-98-9.68-10.96 101207~|~1~|~1~|~01/STR~|~AC overlay or fine graded polymer AC overlay on DEL-203-0.06-9.10, MAR-4-1.79-5.72, MAR-47-0.62-2.09, MAR-98-0.00-9.68, MAR-98-10.96-17.17, MAR-203-0.00-0.43. 101172~|~1~|~1~|~01/IMS~|~Concrete pavement repair 103118~|~1~|~1~|~01/NFP~|~Pavement grinding at the IR 270/Roberts Rd interchange 117163~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - replacement of KNO-362-0.12 (SFN 4235525) structure. 120946~|~1~|~1~|~01/BRO~|~All work included in this split 97491~|~1~|~1~|~01/BRO~|~Replace structure CAR-542-0573 (SFN 1001868) with a new structure. 116784~|~1~|~1~|~01/IMS~|~Resurfacing plan split 101280~|~1~|~1~|~01/STR~|~SEN-12 from SLM 3.988 to 13.085 101280~|~1~|~4~|~04/NHS~|~100% Local aspects of Urban Paving Scope - US-23 from SLM 9.98-11.88 101280~|~1~|~3~|~03/NHS~|~Urban Paving F/L Plan Split - US-23 from SLM 9.98-11.88 101280~|~1~|~2~|~02/S5K~|~Resurfacing on SR 12 from SLM 3.47 to 3.988 104742~|~1~|~1~|~01/NHS~|~Culvert replacement on LAW 52 21.44 120190~|~1~|~1~|~01/S>2~|~Resurfacing 83407~|~1~|~1~|~01/CMQ~|~CMAQ Plan Split for TRU Western Reserve Greenway (Bike Trail) Phase 3 99533~|~1~|~1~|~01/ENH~|~Extend Olengtangy Trail Bikeway 92454~|~1~|~1~|~01/S<2~|~Replace culvert between US 62 and Darby Crk Rd 107220~|~1~|~1~|~01/NFA~|~The City will reconstruct and widen 1500 lineal feet of Agnes St from SR 15 west to Karnes Ave. 90120~|~1~|~1~|~01/BRO~|~4808169 LUC IR475 12.83 Intersect: Woodley Road 121259~|~1~|~1~|~01/NFP~|~added HS plan split. 124413~|~1~|~1~|~01/SAF~|~All roundabout work included in this split. 111528~|~1~|~1~|~01/MPO~|~MPO Funded items 107493~|~1~|~1~|~01/CMQ~|~Plan split 78257~|~1~|~1~|~01/NHS~|~minor rehab of TUS-250-12.79 to 17.32; includes pavement, pavement repair, profile correction under bridge, pavement marking 84112~|~1~|~1~|~01/MPO~|~CMAQ and TAP funds for all eligible work on this project. 108271~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER Event. DSR# BEL-016. 101419~|~1~|~1~|~01/S>2~|~FY2019 Urban Paving Project in the City of Milford. This plan split is for SR 126 where the pay items are split 80% State and 20% City between SLM 25.41 - 25.88. 101419~|~1~|~2~|~02/S>2~|~FY2019 Urban Paving Project in the City of Milford. This plan split is for SR 126 where the pay items are 100% City costs between SLM 25.41 - 25.88. 121494~|~1~|~1~|~01/NHS~|~Bridge replacement. 117133~|~1~|~1~|~01/MPO/GCEO~|~Resurfacing of Dayton-Yellow Springs Road from the eastern Fairborn corp. limit to the western Yellow Springs corp. limit. 118552~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay. MEG-7-18.62-22.80-23.99 and ATH 7 0.00-1.36. Funded 80 Federal/20 State. 123571~|~1~|~1~|~01/SAF~|~District wide lighting replacements. Locations TBD 106643~|~1~|~1~|~01/ENH~|~Construction of the Meigs Middleport multi-use trail. Funded 95 federal/5 local. 93647~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 102032~|~1~|~2~|~02/NHS~|~Split for resurfacing; Lump Sum $400,000 for ODOT section paid with 80% Fed/20% St - District allocation (SLM 10.33 to 10.93 ) then 100% City for paving the rest of SR 51 ( Monroe St) 102032~|~1~|~1~|~01/SAF~|~Safety split for intersections on Monroe St (SR-51) at Secor Rd, East Mall Drive and Tallmadge 107692~|~1~|~1~|~01/NHS~|~HEN-6-5.37 121674~|~1~|~1~|~01/IMS~|~FRA-270-43.632R and FRA-270-43.724L over Big Walnut Creek & Noe Bixby Rd replace bridges 123759~|~1~|~1~|~01/IMS~|~Plan split for sign replacements on IR-280 102442~|~1~|~1~|~01/STR~|~BRO 50 3.95 Culvert Replacement 110212~|~1~|~1~|~01/NFP~|~Plan split for Shoulder work 92003~|~1~|~4~|~04/S<2~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. Brdgs F/Rehab:7303017 SCI SR73 25.68 Intersect: Scioto River80/20 split01/S<2/BR/State 92003~|~1~|~2~|~02/STR~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. Brdgs F/Rehab:7302827 SCI SR73 22.41 Intersect: Dry Run80/20 split01/STR/BR/State 92003~|~1~|~1~|~01/STR~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. Brdgs F/Pave Thru:7302797 SCI SR73 20.94 Intersect: Pond Creek80/20 split01/STR/PV/State 92003~|~1~|~3~|~03/S<2~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. 80/20 split01/S<2/PV/State 117678~|~1~|~1~|~01/SAF~|~Plan split for safety related items 117678~|~1~|~2~|~02/ENH~|~Plan Split for TAP funding to construct a Shared Use Path from Carronade Drive to Crossroads Parkway 101188~|~1~|~1~|~01/NHS~|~Seal bridge decks on Jefferson County SR 7 as part of preventative maintenance strategy. 91177~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on US 68 in Urbana from Laurel/Oak (SLM 7.17) to the Urbana North Corporation Limit (SLM 8.65) - USR 68 from the south corporation limit (SLM 5.10) to 0.06 north of SR 55 (SLM 5.54) 120036~|~1~|~1~|~01/S5K~|~All work included in this split. 121457~|~1~|~1~|~01/CMQ/STOW~|~Signal replacements and upgrades. 117872~|~1~|~1~|~01/BRO~|~Split for bridge work 107514~|~1~|~1~|~01/STR~|~Resurfacing TUS-516 87127~|~1~|~1~|~01/IMS~|~Interstate Bridge work 87127~|~1~|~2~|~02/STR~|~STP Rural bridge work 87127~|~1~|~3~|~03/S>2~|~Bridge work on Lrg. Urban bridges. 87127~|~1~|~4~|~04/NHS~|~Bridge work on NHS bridges. 112760~|~1~|~1~|~01/NHS~|~Bridge Painting. 116940~|~1~|~1~|~01/STR~|~Chip Seal 87184~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on a portion of IR 71 in Warren County; from SLM 0.00 to 15.14 87184~|~1~|~2~|~02/IMS~|~Plan split includes work on the following structures: WAR-71-0144/8301743, WAR-71-0358E/8301859, WAR-71-0679L/8301980, WAR-71-0679R/8302014, WAR-71-0253/8301808, WAR-71-0657R/8301956, WAR-71-0657L/8301921, WAR-71-0169/8301778, This includes approach pavement work on overhead structures. 107470~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 from Brilliant to Steubenville 83777~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 160 0.00-3.06. Urban other federal aid route funded Federal 80%, State 20%. 83777~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. GAL 35 13.42-17.79. NHS route funded Federal 80%, State 20%. 124259~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 87161~|~1~|~1~|~01/NHS~|~NHS Route BEL SR7 GSMP funds. Failed retaining wall. Remove failed wall and replace with new wall. 104094~|~1~|~1~|~01/IMS~|~Split for bridge work 104094~|~1~|~2~|~02/NFP~|~Retro fuel price adjustment 104094~|~1~|~3~|~03/NFP~|~Split for Dominion EOG work at 100% local 123718~|~1~|~2~|~02/S>2~|~Plan split for resurfacing STP Urban 123718~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP Rural 106786~|~1~|~1~|~01/S>2~|~Work to repair/resurface Coit Road from Kirby Ave to St. Clair Ave that is eligible for federal-aid. 106786~|~1~|~2~|~02/NFP~|~Work to repair/resurface Coit Road from Kirby Ave to St. Clair Ave that is not eligible for federal-aid. 94827~|~1~|~1~|~01/NFP~|~Culvert Repairs - Paved Invert 106292~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties. 102793~|~1~|~1~|~01/IMS~|~This plan split is for work on Interstate bridges. 110408~|~1~|~1~|~01/S>2~|~FY23 Urban Paving on SR 741 in the City of Mason. 110408~|~1~|~2~|~02/S>2~|~This plan split is for all items paid 100% by the City. 103923~|~1~|~1~|~01/STR~|~Culvert Repair: MED-303-13.90 121279~|~1~|~1~|~01/IMS~|~Work on interstate bridges. Locations may be added as needs arise. 116462~|~1~|~1~|~01/MPO/AKRO~|~Reconstruction of SUM SR 18 in the City of Akron. 95411~|~1~|~1~|~01/MPO~|~Construct a multi-purpose trail along Fairhill Road from East 127th Street to the intersection of North Park Blvd and Coventry Rd using MPO Enhancement with 80% federal and 20% local participation. 89708~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work using MPO Enhancement funds. 110017~|~1~|~1~|~01/IMS~|~Interstate Plan Split 110017~|~1~|~2~|~02/NHS~|~NHS Plan Split 110017~|~1~|~3~|~03/S>2~|~Urban Area (STP>200000) Plan Split 110017~|~1~|~4~|~04/S<2~|~Urban Area (STP<200000) Plan Split 110017~|~1~|~5~|~05/STR~|~Rural Plan Split 104279~|~1~|~1~|~01/SAF~|~SYSSIGN 92375~|~1~|~1~|~01/STR~|~resurface WOO SR 65 5.89-11.43 - SR-235 to SR-64 122119~|~1~|~1~|~01/NHS~|~NHS plan split. 119443~|~1~|~1~|~01/IMS~|~Split for noise barrier replacement 99447~|~1~|~1~|~01/NFP~|~Roadway and parking lots in Olander Park. 101421~|~1~|~1~|~01/S<2~|~Plan Split for the 80/20 items on SR 134 and part of US 68Urban Paving. 101421~|~1~|~2~|~02/S<2~|~Plan Split for the 100% City items on SR 134 and part of US 68Urban Paving. 83984~|~1~|~2~|~02/STR~|~HEN-424 from SLM 12.33 to 14.53, 83984~|~1~|~3~|~03/BRO~|~Removal of abandoned RR bridge, SFN 3503690, HEN-424-10.27 83984~|~1~|~1~|~01/NHS~|~LUC-24 from SLM 0.00 to 12.73 NHS (Rural & Urban) 115528~|~1~|~1~|~01/NFA~|~Plan Split for J&C Funds 85825~|~1~|~1~|~01/SAF~|~It is proposed to improve efficiency of major intersections, signalization system, turn lanes, and parking based on a comprehensive traffic flow study completed in Ironton. The proposed project will include signalization equipment replacement and upgrades, lane and parking reorganization, as well as turning lane improvements. 112994~|~1~|~1~|~01/NHS~|~LAW 52 5.00-11.75 112994~|~1~|~2~|~02/NHS~|~Bridge PM 113445~|~1~|~1~|~01/IMS~|~Application of recessed and wet reflective markings to sections of interstate within D5. 95413~|~1~|~1~|~01/SAF/JAC~|~It is proposed, using CEAO Safety Funds, to install new and upgrade existing pavement markings on various routes within Jackson County.100% Safety fundsFed Max $150,000 101029~|~1~|~1~|~01/NHS~|~Systematic sign replacement on the NHS routes 101029~|~1~|~2~|~02/S>2~|~Systematic sign upgrade on the large urban locations. 101029~|~1~|~3~|~03/STR~|~Systematic sign upgrade on the rural locations 101029~|~1~|~4~|~04/IMS~|~This plan split includes all work associated with placing signs on several ramp locations along I-71, I-75, I-275, IR-74, and IR-471 in Hamilton County. 81322~|~1~|~1~|~01/IMS~|~Construct an added fourth lane in each direction on Mainline IR 75 and correct a horizontal curve deficiency on Mainline IR 75. This is a continuation of the WAR 75 3.40 project ending 2,100 feet south of the Montgomery County Line On WAR MOT 75 from 11.80 SLM to 12.20;MOT IR 75 From 0.00 to 1.98. 101697~|~1~|~1~|~01/S50~|~Pavement: AC Overlay w/o Rpr: ERI SR 269 7.451 TO 7.504 ERI SR 269 7.319 TO 7.451 AC Overlay w/Rpr: ERI SR 269 7.955 TO 8.541 ERI SR 269 12.521 TO 12.690 Associate Add 101697~|~1~|~2~|~02/STR~|~Pavement: AC Overlay w/o Rpr: ERI SR 269 04.262 TO 7.319 AC Overlay w/Rpr: ERI SR 269 08.541 TO 8.555 ERI SR 269 11.315 TO 12.521 101697~|~1~|~3~|~03/NHS~|~Bridge: ERI SR 002 1.830 SFN 2204053: Preventive Maintenance Deck Sealing (051) Reactive Maintenance Exp jt repair/repl (048) Deck patching(conc) (049) Minor Rehabilitation Conc patching (non-deck) (010) 101697~|~1~|~4~|~04/S50~|~Bridge: ERI SR 269 8.035 SFN 2203987: Preventive Maintenance Deck Sealing (051) Reactive Maintenance Exp jt repair/repl (048) Deck patching(conc) (049) 101697~|~1~|~5~|~05/SAF~|~Centerline rumble stripes on SR-269-4.26-7.32 91664~|~1~|~2~|~02/SAF~|~Safety/4BC7 $'s for signal work at 23/750 91664~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint funding for 1 yr Elec Maint contract 91664~|~1~|~3~|~03/S>2~|~Signalization work at SR750/Highmeadows Village Drive (reference PID 83722) 105365~|~1~|~1~|~01/IMS~|~Resurface using Asphalt Concrete. 124518~|~1~|~1~|~01/S5K~|~Deck overlay 95749~|~1~|~1~|~01/S<2~|~Planing and resurfacing of CR-46 (Lytle Five Points Road) from a point 80 feet east of SR-741 to 160 feet west of Sycamore Springs Drive. Base repairs as required, and replacement of damaged curb and gutter. 82832~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. HOC 56 13.60-21.29 and VIN 56 0.00-8.28. Rural other federal aid funded 80 federal/20 state. 113286~|~1~|~1~|~01/NFP~|~All work in this project. 112747~|~1~|~2~|~02/IMS~|~All items of work associated with Bridges within the project limits. 112747~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FAY-71-0.00-9.49 112747~|~1~|~3~|~03/SAF~|~All items associated with the installation of Recessed Wet Reflective Pavement Markings; FAY-71-9.49 to MAD-71-3.99. 112747~|~1~|~4~|~04/SAF~|~Install median cable barrier from FAY-71-0.00 to FAY-71-9.49 103234~|~1~|~1~|~01/NFA~|~TID is constructing the Social-Fosters Road Widening and Bridge Project including, but not limited to, roadwork improvements by widening of Social-Fosters Road to five lanes from Innovation Way to Columbia Road, including new bridge overpass at I-71, new roundabout at Innovation way, intersection/signal improvement at Columbia Road and five-foot wide sidewalk on the north side of the road between Innovation Way and Columbia Road. 116928~|~1~|~2~|~02/NHS~|~Bridge Patching NHS Non-Interstate 116928~|~1~|~1~|~01/IMS~|~Patching on various bridges - Interstate 98546~|~1~|~2~|~02/NFA~|~Funding split for all work associated with the CLE-232-0154 structure. 98546~|~1~|~1~|~01/NHS~|~Funding split for all costs associated with the CLE-52-12.89 structure replacement. 93388~|~1~|~1~|~01/NHS~|~Normal Project Participation to provide dilemma zone at signals. All on NHS route. 120477~|~1~|~1~|~01/BRF~|~Bridge replacement under the Muni Bridge program. 100582~|~1~|~1~|~01/STR~|~SCI 104 (6.37-17.70) 120114~|~1~|~1~|~01/MPO~|~Work to be funded by the MPO capped amount 106239~|~1~|~2~|~02/SAF~|~Split for the Wallings Rd bridge work over I-77 with Safety, system preservation, and local funds 106239~|~1~|~1~|~01/SAF~|~Split for Wallings Rd pavement work using safety and local funding. 106239~|~1~|~3~|~03/NFP~|~Split for Dominion East Ohio relocation on the bridge. 122184~|~1~|~1~|~01/STR~|~CEAO funded resurfacing 93448~|~1~|~2~|~02/NHS~|~Structural steel bridge painting on: SFN 1202634 CLA 68 0716 Norfolk Southern RR 93448~|~1~|~1~|~01/BRO~|~Structural steel bridge painting on: SFN 1202529 CLA 68 0664 (CR 333 Dayton-Springfield RD) SFN 1202642 CLA 68 0718 (Access Road) 111821~|~1~|~1~|~01/NFP~|~CUY - Secret Sauce 111821~|~1~|~2~|~02/NFP~|~CUY - Secret Sauce 91897~|~1~|~1~|~01/IMS~|~Spot paving repair at various locations on FRA IR 71 and IR 270 122872~|~1~|~1~|~01/NFP~|~All work included in this split. 91743~|~1~|~1~|~01/SAE~|~100% federal HSIP funding 99454~|~1~|~1~|~01/IMS~|~Rockfall mitigation by installation of rockfall barrier. 98614~|~1~|~1~|~01/S>2~|~Drainage and Guardrail improvements to Ravenna Warren Road in Braceville and Newton Townships in Trumbull County, Ohio. The proposed improvements will remedy localized flooding resulting from filled drainage pipes and will help reserve the pavements in the affected areas. 115207~|~1~|~1~|~01/NFP~|~Created for J&C involvement 115530~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 86256~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split for all work using federal MPO STP funds. 86256~|~1~|~2~|~02/NFA~|~100% local participation work items. 103175~|~1~|~1~|~01/S>2~|~Construct a separated bike path along the west side of street in the City of Dayton. 122006~|~1~|~1~|~01/S5K/LANC~|~Pedestrian Safety Improvements and related work along US 22/East Main Street in the City of Lancaster. Systemic Safety funded 90% (4HJ7) Federal/10% (LNTP) Local match. 87363~|~1~|~1~|~01/NHS~|~Preventive Maintenance project using high density polystyrene to raise concrete. ATH 50 21.74-21.77, 23.86-23.90, MEG 33 0.21-0.25, 1.37-1.40, 13.58-13.60 WB only, 15.19-15.23, and 26.53-26.57. NHS route 80/20% Federal/State. 124613~|~1~|~1~|~01/S>2~|~Plan split for installing pavement markings for Locally sponsored project, road diet. 123241~|~1~|~1~|~01/S5K~|~Resurfacing. 123241~|~1~|~2~|~02/BRO~|~Bridge Rehabilitation. 118819~|~1~|~1~|~01/S50~|~Roundabout items 118978~|~1~|~1~|~01/SAF~|~Plan split for district wide signal contract. 104405~|~1~|~1~|~01/NFP~|~Construction of salt barn at Jackson County Oak Hill outpost. 97411~|~1~|~2~|~02/NFA~|~Replace SFN 7634188 STA-TR 153-1.15 Elson St SE over Little Sandy Creek, Stark County, Ohio. 97411~|~1~|~1~|~01/NFA~|~Replace SFN 7633491 STA-CR 25-0.71 Aebi Avenue over Beech Creek, Stark County, Ohio. 97411~|~1~|~3~|~03/S>2~|~Replace SFN 7633270 STA-CR 212-0.18 High Mill Ave NW over Mudbrook Creek, Stark County, Ohio. 84630~|~1~|~3~|~03/S<2~|~PIK SR220 7.05 - 13.51 Resurfacing ProjectBrdg F/Rehab in Urban portion of project.6602347 PIK SR220 8.11 Intersect: Crooked Creek80/20 split03/S<2/BR/State 84630~|~1~|~1~|~01/S<2~|~PIK SR220 Resurfacing Project.SLM 7.050 to 9.550 urban areaBegin project @ Waverly west corp, head east and terminate at Shuster Road (Zahan's Corner). CO CC PV Urban 80/20 split01/S<2/PV/State 84630~|~1~|~4~|~04/STR~|~PIK SR220 7.05 - 15.06 Resurfacing ProjectBrdg's F/Rehab in Rural portion of project6602398 PIK SR220 9.706602533 PIK SR220 12.43 Intersect: CSX RR80/20 split04/STR/BR/State 84630~|~1~|~2~|~02/STR~|~PIK SR220 7.05 - 15.06 Resurfacing Project.SLM 9.55 to 13.51 rural areaBegin project @ Waverly west corp, head east and terminate at Shuster Road (Zahan's Corner). CO CC PV RuralPave thru brdg:6602401 PIK SR220 10.53 Intersect: N&W RR6602436 PIK SR220 10.57 Intersect: C&O RR80/20 split02/STR/PV/State 90191~|~1~|~1~|~01/NHS~|~Highwyay Lighting - 2 locations on WAY US 30 103955~|~1~|~2~|~02/S>2~|~This split includes all work associated with providing added capacity on the project. 103955~|~1~|~1~|~01/S>2~|~Intersection and roadway reconstruction of the existing. No capacity addition. 94350~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay on MEG 124 47.86, SFN 5301718. 94350~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay on MEG 7 2.43, SFN 5300037 and MEG 7 2.63, SFN 5300061. NHS route funded 80 federal/20 state. 116058~|~1~|~1~|~01/BRF~|~Replace structure SFN #7031173 with OBPP funding at 100% - CO & CE 97402~|~1~|~2~|~02/NFA~|~Replace SFN 6739555 POR-CR 50-3.71 Stroup Rd over Unnamed Stream. 97402~|~1~|~1~|~01/NFA~|~Replace SFN 6731252 POR-CR 47-5.49 Industry Road bridge over Barrell Run, 97402~|~1~|~3~|~03/NFA~|~Replace SFN 6734952 POR-CR 72-0.43 Johnnycake Road over Feeder Canal Tributary. 111508~|~1~|~1~|~01/STR~|~Slide repair 114398~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district. 102590~|~1~|~1~|~01/NFP~|~Access control/intrusion and CCTV, fencing and gate. 112618~|~1~|~1~|~01/MPO/STRU~|~Resurfacing. 112618~|~2~|~2~|~02/ENH/STRU~|~Sidewalk repair/replacements on Elm St, in the City of Struthers. 112618~|~2~|~3~|~03/ENH/STRU~|~100% Local Items. 99912~|~1~|~1~|~01/BRF~|~CEAO funding for bridge replacement SFN 8037787 Cunningham-Arbela Rd over Rush Creek 110581~|~1~|~2~|~02/STR~|~100% Local Items 110581~|~1~|~1~|~01/STR~|~FAY-38 from 0.00 to 8.95 103793~|~1~|~1~|~01/SAF~|~Safety: "Roadway, Splitter Islands, Drainage, Curbing, Traffic Control" 103793~|~1~|~2~|~02/SAF~|~Small Cities: "Sidewalks, Sewer, Lighting, Landscaping" 103793~|~1~|~3~|~03/SAF~|~OPWC: "Water Works" 103793~|~1~|~4~|~04/S<2~|~This is for overlay work on CHP US 36 SLM 14.88 to 15.05 covered under the Urban Paving Program. 103793~|~1~|~5~|~05/NHS~|~This is for overlay work on CHP US 68 SLM 6.55 to 6.70 covered under the Urban Paving Program. 115228~|~1~|~1~|~01/SAF/TUS~|~Pavement marking on various county routes with 100% CEAO Safety funds (4HB7). 86149~|~2~|~3~|~03/NHS~|~Signal and turn lanes on SR-3 at Plumb Rd 86149~|~2~|~4~|~04/NHS~|~Culvert replacement (District funding) 86149~|~1~|~2~|~02/NHS~|~Ashpalt overlay on 1 structure:2100045 DEL SR3 6.92 Intersect: Little Walnut Creek 86149~|~1~|~1~|~01/NHS~|~D6 federal/state resurfacing of DEL-3 SLM 1.38-8.74 including two culvert replacements and signal work on existing signals 120462~|~1~|~1~|~01/NFP~|~ODNR project for resurfacing park roads and the headquarters at the HOC Tar Hollow State Park. 91029~|~1~|~1~|~01/MPO~|~Resurfacing 97626~|~1~|~3~|~03/S<2/COSH~|~"01/S<2/PV/COSH - additional plan split for work identified inside the Corporation Limits of the City of Coshocton location from 1.88-3.30 97626~|~1~|~2~|~02/STR/WLAF~|~"02/STR/PV/WLAFA" Resurfacing w/in the Village of West Lafayette from mile marker 6.27 - 6.74 97626~|~1~|~1~|~01/STR/CCEO~|~"01/STR/PV/CCEO" - Resurfacing of Coshocton County Road 16 - from mile marker 3.30-6.27 utilizing CEAO STP funding SAC 4B77 with a maximum dollar amount of $1,638,300,000. Current project estimate is $1,748,186 117449~|~1~|~1~|~01/BRF~|~Bridge Replacement (SFN 2133296) 114956~|~1~|~1~|~01/S<2~|~Bridge overlay 114956~|~1~|~2~|~02/STR~|~Bridge overlay 122802~|~1~|~1~|~01/STR~|~Resurfacing on Various Highland County Routes. 81174~|~1~|~1~|~01/CMQ~|~replacing Central Avenue grade crossing with a new grade separation over CSX Railroad on new alignment 101378~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span. 101378~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 101378~|~1~|~5~|~05/IMS~|~Concrete deck overlay > 20' span. 101378~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' span. 101378~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span. 101378~|~1~|~6~|~06/IMS~|~Collision damage repair > 20' span. 101378~|~1~|~7~|~07/IMS~|~Heat straightening of damaged beams > 20' span. 123767~|~1~|~1~|~01/SAF~|~Plan split for traffic signal work 89464~|~1~|~1~|~01/IMS~|~IM funding for pavement reconstruction, no added capacity (67% of pavement and roadway costs, for items not specifically identified in other splits). 89464~|~1~|~2~|~02/NHS~|~NH funding for pavement construction, added capacity (33% of pvmt and roadway costs, for items not specifically identified in other splits), 89464~|~1~|~5~|~05/NHS/Cols~|~Incremental items - Columbus to pay the difference above standard items including LA fence, granite cobbles 89464~|~1~|~3~|~03/IMS~|~IM funding for structure replacement no added capacity (67% of costs except 100% for SFN 2504537 FRA-70 over Short St.) 89464~|~1~|~4~|~04/NHS~|~"NH funding for structure replacement - added capacity (33% of costs) 117818~|~1~|~1~|~01/ERD/CIN~|~Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati. 89428~|~1~|~1~|~01/IMS~|~Lighting Maintenance 101130~|~1~|~1~|~01/NHS~|~Various locations in Cities and Villages throughout Lucas and Wood Counties. 118617~|~1~|~1~|~01/SAE/PCEO~|~Replacement and repair of guardrail 103644~|~1~|~1~|~01/S<2~|~DSR BEL-017 114875~|~1~|~1~|~01/STR~|~Overlay JAC 93 114875~|~1~|~2~|~02/STR~|~added BR plan split. 94666~|~1~|~1~|~01/STR~|~Herbicidal spray at various locations throughout the District. Funding pot = 4CP7. 113463~|~1~|~1~|~01/NFA~|~Resurfacing 24.3 miles of couty roads within the boundaries of Wayne National Forest with chip seal treatment. FLAP funded. 91107~|~1~|~1~|~01/IMS~|~District Allocation - 80/20 105111~|~1~|~1~|~01/STR~|~HIG 73 0.30 (SFN 3601536) Bridge Replacement. 92953~|~1~|~6~|~06/ENH~|~Medina County Waterline.Any betterments and work not required by the project to be replaced. 92953~|~1~|~7~|~07/ENH~|~Medina City Waterline.Any waterline replacements that are owned by the City, outside of the City; these are not project eligible and will be 100% local cost. 92953~|~1~|~3~|~03/ENH~|~Non-NHS Added Capacity (60%).Also includes additional turn lanes on River Styx Rd.1st priority: Safety Funds2nd priority: TRAC Funds 92953~|~1~|~4~|~04/ENH~|~Non-NHS No Added Capacity (40%).Also Includes improvements on Foote Rd. north and south, as well as River Styx Rd. 92953~|~1~|~1~|~01/NHS~|~NHS Capacity Added (60%)1st priority: Medina County Commissioners (Medina Co Engineer's Funds, Capped at $100,000)2nd priority: Safety Funds3rd priority: TRAC Funds 92953~|~1~|~5~|~05/SAF~|~Safety Project- Signal WorkAlso Includes extending the proposed SR 18 concrete median from Rustic Hills to the Frontage Rd signal 92953~|~1~|~8~|~08/ENH~|~Enhancement. Multi-use path.Base and pavement, pedestrian bridge, pavement markings and signage. Embankment will be included in splits 1 and 3. 92953~|~1~|~2~|~02/NHS~|~NHS No Added Capacity (40%).Also includes the north and south frontage roads, which are access management, not added capacity.1st priority: Major 2 Funds Capped at $5,000,000.2nd priority:TRAC Funds 92953~|~1~|~9~|~09/SAF~|~1st Priority Wet Reflective Long Line Markings including Grooving 100% 4HJ7 Capped Safety Funds2nd Priority Delta for Remaining Costs using TRAC Funds 92953~|~2~|~10~|~10/ENH~|~Part 2: Non-NHS Added Capacity (60%). Widening and Reconstructing River Styx Rd from Smith Rd to 295 ft South of Smith Rd. New Storm Drainage, Traffic Signals and Signage will be installed. 92953~|~2~|~11~|~11/ENH~|~Part 2: Non-NHS No Added Capacity (40%). Widening and Reconstructing River Styx Rd from Smith Rd to 295 ft South of Smith Rd. New Storm Drainage, Traffic Signals and Signage will be installed. 117735~|~1~|~1~|~01/NHS~|~Repair of damaged beam and other bridge components resulting from bridge strike. 105865~|~1~|~1~|~01/IMS~|~Added plan split. 105865~|~1~|~2~|~02/IMS~|~Added CO CO Engr 02 plan split. 91303~|~1~|~1~|~01/STR~|~Slide Repair 123226~|~1~|~1~|~01/S5K~|~400 ft landslide repair SR 536-1.60mm 106135~|~1~|~1~|~01/NHS~|~Deck replacement > 20 ft span. 120701~|~1~|~1~|~01/NHS~|~Smoothseal. 98138~|~1~|~1~|~01/NHS~|~BRO 52 13.30 to 17.41 113311~|~1~|~1~|~01/MPO~|~work eligible for federal-aide. 124933~|~1~|~1~|~01/NHS~|~Plan split for resurfacing roadway on the NHS system 124933~|~1~|~2~|~02/S>2~|~Plan split for resurface work on Other Federal Aid Urban roadway. 124933~|~1~|~3~|~03/STR~|~Plan Split for resurfacing work on Other Federal Aid Rural roadway. 88680~|~1~|~1~|~01/NFA~|~Smooth seal SR 274 in Logan County.LOG SR 274 SLM 11.00 - 15.78 111191~|~1~|~1~|~01/NFA~|~Bridge repair/superstructure replacement project. WAS TR 29 0.98. SFN 8433143. Funded 95 Federal/5 Local (15% Credit Bridge). 102365~|~1~|~1~|~01/NFP~|~Split for crack sealing 102351~|~1~|~2~|~02/STR~|~STA SR 93 from 6.39 to 8.82STA SR 183 from 0.68 to 2.09 and 5.88 to 6.47STA SR 241 from 3.78 to 4.16STA SR 619 from 6.69 to 7.36 102351~|~1~|~1~|~01/S>2~|~STA SR 93 from 5.84 to 6.39STA SR 241 from 4.16 to 6.01STA SR 619 from 4.66 to 6.69 88836~|~1~|~1~|~01/NHS~|~This funding split is for resurfacing on the NHS system. 88503~|~1~|~4~|~04/STR~|~SFNs: 7202695, 7202741, 7202776, 7202806, 7203012. 88503~|~1~|~3~|~03/STR~|~SAN-412-1.56, @ 3.12 @ 4.70 and @ 5.19. 88503~|~1~|~1~|~01/S<2~|~For piece on SR-412 from SLM 0.00 to 0.15 88503~|~1~|~2~|~02/STR~|~SAN SR412 0.15-4.7 114331~|~1~|~1~|~01/NFP~|~Plan Split for resurfacing within Blue Rock State Forest 109963~|~1~|~1~|~01/NHS~|~NHS Plan Split 109963~|~1~|~2~|~02/S>2~|~Urban Area (STP>200000) Plan Split 109963~|~1~|~3~|~03/STR~|~Rural Plan Split 109963~|~1~|~4~|~04/IMS~|~Interstate Plan Split 121912~|~1~|~1~|~01/SAF~|~All work included in this split. 86136~|~1~|~1~|~01/STR~|~Preble County culvert replacement project. Replace culverts PRE-121-0246, PRE-121-0373, PRE-121-0567, PRE-732-1142, PRE-732-1276. 89233~|~1~|~1~|~01/BRF~|~Brdg ReplacementIt is proposed to replace structure SFN 3632474 SLM 1.26 over Rocky Fork Creek and structure SFN 3632490 SLM 2.84 on Tolle Road, both bridge replacements in Highland county on TR225. Federal Max is $1,26,040.00 per CEAO e-mail dated 03/25/2013. 01/BRF/BR/Highland 102938~|~1~|~1~|~01/IMS~|~Interstate eligible. 102938~|~1~|~2~|~02/NHS~|~Plan split for NHS bridges - Luc 2 25.24 102938~|~1~|~3~|~03/IMS~|~Major New funded bridge - I75 ove Berdan Ave 102938~|~2~|~4~|~04/IMS~|~Recessed -wet reflective pavement markings on LUC-75 and LUC-475. 90653~|~1~|~1~|~01/SAF~|~Safety project to reconstruct roadway on US-62 from Eakin/Hopkins to Brown Rd 90653~|~2~|~3~|~03/SAF~|~Storm sewer from Brown Rd to Columbus Storm Sewer System at Mound St 90653~|~1~|~2~|~02/ENH~|~MORPC Enhancement and FRA County local funds for bicycle and pedestrian facilities only 106624~|~1~|~1~|~01/IMS~|~Plans split for Luc-280-4.61 SB Drive lane overlay 106102~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAR-309D-0.00-0.34 MAR-423D-1.37-1.43 MAR-423-7.66-8.50 MAR-529-0.00-0.46 106102~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: MAR-529-0.46-2.59 106102~|~1~|~3~|~03/S<2~|~Non Urban Paving items and Items to be paid 100% by the City of Marion 118715~|~1~|~1~|~01/S>2~|~Superstructure replacement. 115000~|~1~|~1~|~01/NFP~|~Traffic Signal Upgrades. 99761~|~1~|~1~|~01/S<2~|~Slide repair on LAW-7-0.58 94106~|~1~|~1~|~01/CMQ~|~Construction of a compressed natural gas (CNG) station on property adjacent to the southern border of the City of Hamilton's municipal garage located at 2210 S. Erie Highway. The City of Hamilton is currently acquiring this parcel, which will also be utilized for employee parking. 99072~|~1~|~1~|~01/IMS~|~A contract to operate 3 moveable bridges; perform necessary related work. 123205~|~1~|~1~|~01/NFP~|~ITS maintenance of various devices and infrastructure. 124439~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement 98691~|~1~|~1~|~01/NFA~|~Resurfacing project on WAS CR 10 0.00-1.69. Not on any federal aid system funded 80% federal (WWW/4TA7)/20% local. 96656~|~1~|~1~|~01/IMS~|~Resurfacing on WAR-71 113985~|~1~|~1~|~01/SAF~|~Recessed wet reflective pavement markings 117231~|~1~|~1~|~01/SAF~|~Safety widening 101575~|~1~|~1~|~01/S>2~|~Widening of southbound SR-4 to provide an additional lane exclusively for traffic heading to the WB IR-275 on-ramp. Improvements include grading, drainage improvements, modification of the WB IR-275 off-ramp signal, modifications to pavement markings, and installation of new signage (overhead and ground-mounted). 123213~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. WAS 555 7.70-19.41 87716~|~1~|~2~|~02/IMS~|~Structure work for Interstate Bridges. 87716~|~1~|~3~|~03/NHS~|~Structure work for NHS Bridges 87716~|~1~|~1~|~01/IMS~|~RESURFACING:MED-IR-71-06.66 TO 09.21 (60)AC OVERLAY W/RPRMED-IR-76-00.00 TO 00.73 (60)AC OVERLAY W/RPR 87716~|~1~|~4~|~04/SAF~|~Split 4/1 is Delta for wet reflective optics and grooving for the pavement markings (100% 4HJ7) and split 4/2 to cover the remaining costs (4PF7/4PS7) 87716~|~1~|~5~|~05/IMS~|~Vehicle Fire on Bridge damaging the parapet and protective epoxy urethane sealing. 9670~|~1~|~1~|~01/S>2~|~Plan split for al work on this project. Unfunded at this time. 111361~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads R-5, R-4, R-2, R-3, F-3, F-2, F-4 in Strouds Run State Park. Funded 100% State. 117916~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-C 124442~|~1~|~1~|~01/S>2~|~Plan split for federally eligible construction items 116681~|~1~|~1~|~01/STR~|~On SR 81 in Hardin County from the Allen County Line to US 68, not including the village of ADA 100795~|~1~|~1~|~01/IMS~|~Overaly IR 675 in Montgomery County MOT IR 675 SLM 0.00 to 4.11 94218~|~1~|~1~|~01/NFP~|~District wide pavement marking and raised pavement marking contract for FY2018. Locations to be determined. 91742~|~1~|~1~|~01/NFA~|~Resurfacing project using a fine graded polymer treatment. MEG SR 143 8.25-19.36. Non-Federal aid route, 100% State funds. 91742~|~1~|~2~|~02/S<2~|~Resurfacing project using a fine graded polymer treatment on MEG SR 124 36.88-42.02, 57.15-62.33. 80% Federal and 20% State on Major Collector, Federal Aid System. 88647~|~1~|~1~|~01/IMS~|~Interstate resurfacing plan split 96388~|~2~|~2~|~02/S<2~|~Sidewalk and crossing improvements including ADA curb ramps. Solar poered school zone flasher assemblies for Urbana Junior/Senior High School. CR500 0.930 to 1.540 96388~|~1~|~1~|~01/SAF~|~Construct sidewalk and crossing improvements including ADA curb ramps TR126 3.210 to 5.210 110083~|~1~|~1~|~01/SAF~|~Auxiliary pavement marking project throughout the District 114275~|~1~|~1~|~01/IMS~|~Mowing contract in District 8 94020~|~1~|~1~|~01/BRF~|~Bridge replacement of Keowee Street Bridge SFN 5760550 94020~|~1~|~2~|~02/BRF~|~Non federal eligible construction costs for Keowee Street Bridge replacement 94020~|~1~|~3~|~03/BRF~|~Non-Federal costs associated to Keowee Street Bridge replacement 120071~|~1~|~1~|~01/NFA~|~NEVI Round 2 76-A 91736~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. HOC US 33 4.21-9.48. NHS route funded 80 federal/20 state. 91736~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 12.30-13.07, City of Logan urban paving. Funded 80 federal/20 local. 91736~|~1~|~3~|~03/NFA~|~Install ADA curb ramps in the City of Logan. 91736~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 110707~|~1~|~1~|~01/NFA~|~Construct new sidewalks along Betscher Avenue between East 4th Street and Stadium Drive and along East 7th Street between Betscher Avenue & North Crater Avenue. 116704~|~1~|~1~|~01/S50~|~For Resurfacing on IR 75 in Allen County from SLM 5.53 to 9.85 116704~|~1~|~2~|~02/BRO~|~add plan split for additional bridge decks to receive SS-856 Waterproofing 101361~|~1~|~1~|~01/IMS~|~Bridge cleaning. 101361~|~1~|~2~|~02/NHS~|~Bridge cleaning. 101361~|~1~|~3~|~03/S<2~|~Bridge cleaning. 101361~|~1~|~4~|~04/STR~|~Bridge cleaning. 109247~|~1~|~1~|~01/NFP~|~2019 Operations Chip Seals 101218~|~1~|~1~|~01/NFP~|~District Maintenance Operational Funds - 4CP7 (100% State) - See CAP Comments - District wide mowing project along Interstates and Interstate Look-a-Likes 101190~|~1~|~1~|~01/STR~|~Chip seal 101190~|~1~|~2~|~02/NFA~|~Chip Seal 104513~|~1~|~1~|~01/ENH~|~Resurfacing for Holmes County Park District 95% Federal TAP funds with 5% Local Match. 120360~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in POR, STA and SUM counties. 110337~|~1~|~1~|~01/MPO~|~STP Pavement Work on CR 7 (Strub Road) 110337~|~1~|~2~|~02/MPO~|~TA - Sidewalk on Strub Road 110337~|~1~|~3~|~03/NHS~|~Turn lane 92011~|~1~|~1~|~01/NHS~|~JAC 35 11.24-19.00 92011~|~1~|~2~|~02/NHS~|~4000315 JAC 35 11.464000323 JAC 35 11.474000374 JAC 35 12.164000382 JAC 35 12.164000404 JAC 35 12.284000412 JAC 35 12.284000463 JAC 35 12.944000471 JAC 35 12.944000420 JAC 35 13.654000455 JAC 35 13.654000544 JAC 35 14.794000579 JAC 35 18.914000609 JAC 35 18.92 120382~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 114407~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster Large City Funds with Toll Revenue Credit - 4TA7 (80% Federal) / LNTP (TRC 15% Local ) / LNTP (5% Local) - See CAP Comment -Project for resurfacing and related work on Sixth Avenue in the City of Lancaster. 87147~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project. MOE 7 8.65-11.45 and 21.13-22.73 4LN use Mill/Fill treatment. NHS route funded 80 federal/20 state. 103683~|~1~|~1~|~01/STR~|~Landslide repair on ATH CR 25 7.95, DSR ATH-008. Federal ER funds 80% and 20% Local. 119401~|~1~|~1~|~01/NHS~|~Pedestrian Improvements 117087~|~1~|~1~|~01/NFA~|~D09 HS FY2026 87151~|~1~|~4~|~04/NHS~|~NHS funds frm the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. No local funds. All work on US 33. 87151~|~1~|~1~|~01/STR~|~Rural STP funds from the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. No local funds. SR 118 from the County line at 0.00 to the Van Wert Urban Area boundary. The UA boundary is at 7.73 which is where SR 118 enters the City of Van Wert on the left side of the road. All work on SR 49 and SR 81. 87151~|~1~|~5~|~05/NFP/VAN~|~Items paid 100% by the City of Van Wert. 87151~|~1~|~2~|~02/S<2/VAN~|~Urban STP funds from the District Preservation Program budget with the City of Van Wert providing funds for the 20% match. 80% SAC 4PF7and 20% SAC 4BG7. All work in the City of Van Wert. All work on US 127. Work on SR 116 from 18.70 to 19.06, 19.10 to 19.20 and 19.28 to US 127 at 19.73. Work on SR 118 on the left side starting at the Van Wert Urban Boundary/Corporation Limits at 7.73 to 8.69 on the right side from 7.75 to 7.89 and 8.26 to 8.42. On SR 118 on both sides of the road from 8.69 to Ervin Road. Work on US 224 on the right side of the road from Liberty Union Road (CR 77) (9.26) to the City of Van Wert corporation limits at 9.33. 87151~|~1~|~3~|~03/S<2~|~Urban STP funds from the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. No local funds. Work inside the Van Wert Urban Area but outside the City of Van Wert. Work on SR 116 from Middle Point Road (18.15) to the corportation limits of the City of Van Wert (18.70) and on SR 116 from 19.06 to 19.10 and 19.20 to 19.28. Work on SR 118 on the right side from 7.73 to 7.75 and 7.89 to 8.26 and 8.42 to 8.69. Work on US 224 on the left side of the road from Liberty Union Road (CR 77)(9.26) to the City of Van Wert corporation limits at 9.33 when on both sides of US 224 to the end of the work at the CSX RR at 11.44. 98583~|~1~|~1~|~01/SAF~|~Project includes replacing existing pavement markings with new thermoplastic pavement markings on various county roads in Butler County. 116316~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County. 113709~|~1~|~1~|~01/SAF~|~Rebuild the traffic signal at SR-48 & Corwin Nixon Rd with backplates, pedestrian accommodations, supplementary near-side signal heads and a concrete refuge island. 98473~|~1~|~1~|~01/STR~|~LOR-57-4.87-6.43 Resurfacing 98473~|~1~|~2~|~02/S<2~|~LOR-57-6.43-8.95 Resurfacing 107821~|~1~|~1~|~01/STR~|~MAR-95-15.33 to 19.73 and all bridges not itemized in Bridge Plan Split. 107821~|~1~|~2~|~02/STR~|~MRW-95-19.71 Bridge, SFN: 5902371 107821~|~1~|~3~|~03/STR~|~MRW-95-16.98 bridge, SFN: 5902282 107821~|~1~|~4~|~04/SAF~|~MRW-95-15.33 to 16.67 - Installation of Item 618 - CL Rumble Stripes and Item 874 - LJ Prep 110908~|~1~|~1~|~01/SAF~|~Work to improve pedestrian crosswalk that is eligible for federal-aid 102958~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. 102958~|~1~|~2~|~02/NHS~|~This plan split is for the NHS route. 94201~|~1~|~1~|~01/STR~|~Plan Split for the Rural portions of the project. 94201~|~1~|~2~|~02/S>2~|~Plan split for the Urban portion of the project. 94201~|~1~|~3~|~03/NHS~|~Plan split for the NHS portion of the project. 94201~|~1~|~4~|~04/S<2~|~Plan split for the Small Urban portion of the project. 88349~|~1~|~1~|~01/SAE~|~Safe Route to School funding - Eligible for 100% federal funding. 105521~|~1~|~1~|~01/IMS~|~Opening in median wall for safety vehicles on Interstate 75 118624~|~1~|~1~|~01/NHS~|~Established PLan Split 01/NHS/PV 107865~|~1~|~1~|~01/SAF~|~District Wide Traffic Upgrades-Various Signs, Lighting, Signals. 108342~|~1~|~1~|~01/NFP~|~Asbestos abatement and building demolition of the Hertz/Byers property 87029~|~1~|~1~|~01/SAF~|~Project for systematic sign upgrades in villages and other missed areas that need upgrading. 92791~|~1~|~2~|~02/S<2/LAW~|~LAW CR1 & CR4 Resurfacing ProjectUrban Portion LAW CR 1 0.00 - 12.04 (12.04 miles)80 Fed/20 Local Match by Law. Co. 92791~|~1~|~1~|~01/STR/LAW~|~LAW CR 1 & 4 Resurfacing Rural Portion LAW-CR-4 5.00 to 13.11 (8.11 mile)80 Fed/20 Local match by Lawrence County CEAO 100179~|~1~|~2~|~02/STR~|~Landslide repair project. MOE 536 7.30, DSR MOE-002. ER Funded, 80% Federal and 20% State. 100179~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 7.20, DSR MOE-005. ER Funded, 80% Federal and 20% State. 108313~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER Event. DSR# BEL-024. 114067~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction expenses 93683~|~1~|~2~|~02/NHS~|~This split is for resurfacing work outside of the City of Findlay but inside the Findlay Urban Area. It covers work on US224 from 17.16 (east corporation limit of Findlay) to 17.40. It also covers work along the south side of US224 from 16.22 to 16.28 and along the north side from 16.91-16.95. 93683~|~1~|~4~|~04/S<2/FIND~|~All resurfacing work on SR 568 inside the City of Findlay. From Beech Ave. (0.23) to East St. (0.32). 80% federal funds from the District Preservation Program budget SAC 4PS7 and 20% local funds from the City of Findlay SAC 4BG7. 93683~|~1~|~3~|~03/NHS/FIND~|~100% City items to paid by Findlay. Curb ramps, full and partial depth repair and aux. pavement markings. 93683~|~1~|~1~|~01/NHS/FIND~|~All resurfacing on US224 inside the City of Findlay. From the intersection of Trenton Ave. and N. Main St.(12.76) to the eastern corportation limits (17.16) excluding the portions of US224 which are outside the corporation limits: 16.22-16.28 on the south side and 16.91-16.95 on the north side of US224, 80% federal funds from the District Preservation Program budget SAC 4PF7, and 20% local funds from the City of Findlay SAC 4BG7. 92506~|~1~|~1~|~01/BRO~|~Bridge Replacement 124457~|~1~|~1~|~01/NFP~|~Created for TID Involvement. 95448~|~1~|~1~|~01/SAE~|~Guardrail terminal end upgrade throughout District 4. 115639~|~1~|~1~|~01/S5K~|~Bridge replacement project. HOC 664 16.52, SFN 3704742. 117044~|~1~|~1~|~01/STR~|~WAY SR 0094 14.443 to 18.16 Full Depth Reclamation 98035~|~1~|~1~|~01/NFP~|~District 10 two-year mowing project for CY 2018-19 along Interstates and Interstate look-a-likes (4 LN) district wide. Funded 100% state. 118950~|~1~|~1~|~01/NHS~|~Resurfacing. 95909~|~1~|~1~|~01/NFP~|~Removal of UFST 107530~|~1~|~1~|~01/STR~|~Resurfacing TUS-39 107683~|~1~|~1~|~01/STR~|~Resurfacing in Hardin County. All work on SR 37 and work on SR 53 from the Kenton Urban Area limits at TR 110 at SLM 2.50 to SR 37 at SLM 12.39. Funded with district preservation funds (80% 4PF7 and 20% 4PS7). 107683~|~1~|~2~|~02/S<2~|~Resurfacing in Hardin County on SR 53 inside of the Kenton Urban Area but outside of the City of Kenton. On both sides of the road from where SR 53 leaves the City of Kenton at SLM 1.41 to where it reenters the City of Kenton on the right side of the road at SLM 1.54, then on the left side of the road until the road leaves the City of Kenton on the right side of the road at TR 114 at SLM 1.92 and then on both sides of the road until SR 53 leaves the Kenton Urban Area at TR 110 at SLM 2.50. Funded with district preservation program funds (80% 4PF7 and 20% 4PS7). No local funds. 107683~|~1~|~3~|~03/S<2/KENT~|~Resurfacing in Hardin County on SR 53 where the City of Kenton is responsible for paying the 20% non-federal match. On both sides of SR 53 from E. Forest Street at SLM 1.34 to the City of Kenton corp line at SLM 1.41 and on SR 53 on the right side from the City of Kenton corp line at 1.54 until SR 53 leaves the City of Kenton on the right side at TR 114 at SLM 1.92. Funded with 80% federal funds from the district preservation program budget SAC 4PF7 with the 20% match provided by the City of Kenton. 107705~|~1~|~1~|~01/STR~|~Resurfacing on SR 108 using district preservation funds (80% 4PF7 and 20% 4PS7). 110438~|~1~|~1~|~01/S>2~|~Resurfacing of Frank Ave. 91780~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay treatment. NOB 77 2.50-2.75. Interstate route funded 90% Federal and 10% State. 95139~|~1~|~1~|~01/IMS~|~Construct new wearing surface for all or various areas on structure HAM-71-0000L (SFN 3105946) 112254~|~1~|~1~|~01/STR~|~Plan Split 01 made to account for routes falling within this block PID 122004~|~1~|~1~|~01/S>2~|~Intersection improvement 111515~|~1~|~1~|~01/NFP~|~Mowing various routes in Franklin County 112219~|~1~|~1~|~01/NFP~|~This project includes but is not limited to the widening of Seeds Road and Enterprise Parkway. These improvements will follow the alignment of the existing roadway, which extends to the west from the intersection with South Meadows Drive, then curves south where it runs along the east side of I-71 to the Grove City Limits. This new construction will include pavement repairs, asphalt surfacing, widening on Seeds Road and Enterprise Parkway and other ancillary items. 112219~|~2~|~2~|~02/NFP~|~629 Funds 112219~|~3~|~3~|~03/NFP~|~Local Funds 120734~|~1~|~1~|~01/MPO~|~Add two-way left turn lane, curb and gutter, storm sewer and multi use path 101011~|~1~|~1~|~01/STR~|~Resurfacing and related work. 104236~|~1~|~1~|~01/STR~|~Repair structure UNI-161-2.72 over Little Darby Creek. SFN 8002738 91272~|~1~|~1~|~01/STR~|~PIK SR104 4.60 OH11-02 Slide Repair On SR104, begin project 4.6 miles north of the Scioto County line. It is proposed to repair the slip per Fed Dec #OH11-02. 80/20 split 01/STR/OT/State 114652~|~1~|~1~|~01/NHS~|~Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. 109332~|~1~|~1~|~01/NFP~|~ODNR resurfacing campground at Indian Lake State Park 101259~|~1~|~1~|~01/NFA~|~The County is constructing road improvements to support the new Lubricatoin Specialities, Inc facility. Adding an entrance lane off of County Road 253 into the new greenfield site. 124284~|~1~|~1~|~01/ENH~|~TAP / Safety plan split 112154~|~1~|~2~|~02/NHS~|~District wide culvert project. 112154~|~1~|~3~|~03/NFA~|~District wide culvert project. 112154~|~1~|~4~|~04/S5K~|~District wide culvert project. 112154~|~1~|~1~|~01/STR~|~District wide culvert project along STP Rural Routes 110036~|~1~|~1~|~01/BRF~|~Bridge ReplacementPIK CR 84 4.60 (SFN 6631371) 98894~|~1~|~1~|~01/ENH~|~Installation of 8' walk from Youngs Court to Park along SR 39. 105583~|~1~|~1~|~01/S<2~|~AC Overlay w/Rpr ASD IR 71 00.00 - 08.93. 105583~|~1~|~2~|~02/S<2~|~Bridge Work to be determined at a later date. 83096~|~2~|~2~|~02/MPO/PV~|~Revised Plan Split from part 1 to part 2 83096~|~1~|~1~|~01/MPO~|~Mill and fill 116078~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 120944~|~1~|~1~|~01/NHS~|~Replace sidehill bridge carrying SR 7 northbound over slope. 105431~|~1~|~1~|~01/S<2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Deck replacement project for SFN 1601652 and 1601687 carrying SR 83 over the Ohio Central RailRoad 87926~|~1~|~3~|~03/STR~|~STP Rural locations - bridgeSFN 2103745, DEL-605-3.14, 12' span bridge replacement over Woodtown Run 87926~|~1~|~2~|~02/NHS~|~NHS Bridge locationSFN 6500439, PIC-22-20.00 15' splan bridge replacement over Pugsley Run 87926~|~1~|~1~|~01/NHS~|~NHS locations: MAR-23-6.14 culvert replacementUNI-739-0.26 culvert lining 87926~|~1~|~4~|~04/NFA~|~Not on Federal Aid System locationFAY-753-4.63 culvert replacement 104183~|~1~|~1~|~01/NHS~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project. NHS route. 104183~|~1~|~3~|~03/NHS~|~Add ITS camera to the ATH US 33 14.02 location. Funds are 100% State, 4IS7 SAC. 104183~|~1~|~4~|~04/NHS~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project. 104183~|~1~|~5~|~05/S<2~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project. 104183~|~1~|~2~|~02/S<2~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project. Urban other federal aid. 93427~|~1~|~1~|~01/SAE/DLTA~|~FUL US20A 19.65-19.87 82354~|~1~|~1~|~01/BRF/NEWA~|~LCAT's STP Funding 4TA7/LC05 (80% Federal) / 4BG7(20% Local) - CAP (See CAP Comments) - Rehabilitation of 4560159 LIC Ohio ST NORTH FORK Intersect: NORTH FORK; BR Eligible for Rehabilitation: 82354~|~2~|~2~|~02/BRF/NEWA~|~LCAT's STP Funding 4TA7/LC05 (80% Federal) / 4BG7(20% Local) - CAP (See CAP Comments) - Rehabilitation of 4560205 LIC Manning ST NORTH FORK Intersect: NORTH FORK; BR Eligible for Rehabilitation: 82354~|~3~|~3~|~03/ENH/NEWA~|~City of Newark TA project - Enhancement 4B37 (80% Federal) / 4BG7 (15% Local-TRC) / 4BG7 (5% Local) - CAP (See Comments) - Construction of mulit-use trail between CR 823 (Ohio Street) and S. 2nd Street 94108~|~1~|~2~|~02/STR~|~See linked structure > 20' span. 94108~|~1~|~1~|~01/STR~|~Resurfacing ATB US 322 from 17.49 to 22.48. 102181~|~1~|~1~|~01/NFA~|~LAW SR 775 15.45 (SFN 4404807)LAW SR 775 15.70 (SFN 4404831) 83447~|~2~|~4~|~04/MPO/AVON~|~NOACA Enhancement Funds / Local Match ( $882,196 4TC7/NC12 - 20% Local Match) for widening of bridge for sidewalks and bike/multi use path. Tentative NOACA funds cap of $882,196. Priority 2 is 100% City of Avon funds 83447~|~2~|~3~|~03/IMS~|~District Allocation / IM Funds / BR Funds - non enhancement/widening aspects of bridge rehab 83447~|~1~|~2~|~02/S<2/AVON~|~Part 1 Urban Paving - 100% City of Avon responsibilities 83447~|~2~|~6~|~06/IMS~|~District Allocation 90/10 - Interchange Lighting Work 83447~|~2~|~5~|~05/S<2/AVON~|~Part 2 Urban Paving - 80% Fed / 20% City of Avon 83447~|~1~|~1~|~01/S<2/AVON~|~Part 1 Urban Paving - 80% Fed / 20% City of Avon 108341~|~1~|~1~|~01/SAF~|~Signal improvement project at 3 intersections. WAS 7 7.25-7.60 Farson Street, WAS 7 8.50-8.70 Braun Street and WAS 618 5.52-5.60 Lee Street. Safety project funded 90 federal safety/10 local. 120810~|~1~|~1~|~01/STR~|~Pavement markings. 114935~|~1~|~2~|~02/S>2~|~Asphalt Concrete Overlay with Repairs (100% local funds) MED-3-9.868 to 10.949, MED-57-10.425 to 12.729 114935~|~1~|~1~|~01/S<2~|~Asphalt Concrete Overlay (Fed/Local split) MED-3-9.868 to 10.949, MED-57-10.425 to 12.729 116292~|~1~|~1~|~01/STR~|~Overlay in HIG. 117425~|~1~|~1~|~01/SAF~|~Pedestrian improvements on Innis Rd. 92453~|~1~|~1~|~01/STR~|~To replace culvert at FAY 41-3.41 with 14' box 112873~|~1~|~1~|~01/NFP~|~The Village of Hebron will reconstruct Enterprise Drive from SR79 east 880 feet. 86730~|~1~|~2~|~02/S<2~|~District Allocation 86730~|~1~|~3~|~03/NHS~|~District Allocation - NHS - LOR -058-16.51 - 20.97 86730~|~1~|~1~|~01/S<2~|~District Allocation 120445~|~1~|~1~|~01/NFA~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 90777~|~1~|~1~|~01/S<2~|~District Allocation - Intersection Improvement 104159~|~1~|~1~|~01/S<2~|~LAW 7 4.10 Rockfall. 109770~|~1~|~1~|~01/NHS~|~Double micro 109770~|~3~|~3~|~03/S5K~|~Double Microsurfacing of priority system 109770~|~2~|~2~|~02/STR~|~Double Microsurfacing of priority system 120340~|~1~|~1~|~01/S5K~|~Culvert Replacement GAL SR 233-0.306 102293~|~1~|~1~|~01/S<2~|~Resurfacing SR 647 within the City of Martins Ferry. 102293~|~1~|~2~|~02/S<2~|~Curb ramps and auxiliary pavement markings. 107405~|~1~|~1~|~01/BRF~|~Bridge has no SFN 109018~|~1~|~1~|~01/NHS~|~Funding Split for Emergency Pier Repairs. 119419~|~1~|~1~|~01/BRF~|~Bridge replacement 113045~|~1~|~1~|~01/BRF~|~Replacement of Bridge PRE TR-149-1.79 (SFN: 6835015) 101910~|~1~|~1~|~01/NFA~|~Mill & fill CR 43 (Patten Tract Road) and CR 140 (Joppa Road). 101910~|~1~|~2~|~02/NFA~|~Mill & fill TR 131, Chapin Road. 101910~|~1~|~3~|~03/NFA~|~Guardrail improvements on Humm Road, TR 134. 107667~|~1~|~1~|~01/STR~|~Resurfacing. All work on SR 37 and SR 103. All work on SR 67 except for the portion in the Upper Sandusky Urban Area with is from the Urban Area Boundary at City of Upper Sandusky Urban Area limits at 12.65 to the end of the work at High Street in the City of Upper Sandusky at 14.16. All work on SR 293 in the Village of Kirby. Using district preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds. 107667~|~1~|~2~|~02/S<2/KENT~|~Resurfacing of US 68 in the City of Kenton from the south corporation limits of the City of Kenton at 8.84 to the Espy Street intersection in the City of Kenton at 9.25. The 80% federal funds will be from the District Preservation Program budget. The 20% match will be provided by the City of Kenton. 107667~|~1~|~3~|~03/S<2/USAN~|~Resurfacing in the City of Upper Sandusky on SR 67 on the right side from where SR 67 enters the City on the right side at 12.65 until the leaves the City at 12.88 and then again on the right side of SR 67 from when it reenters the City on the right side at 13.13 until it leaves the City at 13.32 and then on the right side of SR 67 from 13.35 where SR 67 reenters the City and on the left side from 13.67 where SR 67 enters the City of the left side until the end of the work at High Street in the City of Upper Sandusky at 14.16. The 80% federal funds will be from the District Preservation Program budget. The 20% match will be provided by the City of Upper Sandusky. 107667~|~1~|~4~|~04/S<2~|~Resurfacing on SR 67 in the Upper Sandusky Urban Area but outside of the City of Upper Sandusky. All resurfacing work on SR from when SR 67 enters the Upper Sandusky Urban Area at 12.65 not included in plan split 3. Federal and state funds from the District Preservation Program budget. No local funds. 107667~|~1~|~5~|~05/NFA~|~Resurfacing on SR 293 in Wyandot County from the south corporation limits to the north corporation limits of the Village of Wharton and on SR 294 in Wyandot County from the west corporation limits to the east corporation limits of the Village of Harpster. The sections of road in this split are classified as Rural Minor Collector and are not eligible for federal funds. Funding is state funds from the District Preservation Program budget. No local funds. 103333~|~1~|~1~|~01/NHS~|~Repair or replace culverts on NHS route. 103333~|~1~|~2~|~02/STR~|~Repair or replace culvert on rural route. 102872~|~1~|~1~|~01/IMS~|~Repair crack in web of beam 2 which carries mainline I-70 traffic over US 68; Br. No. CLA-70-1101; SFN 1204238 116796~|~1~|~1~|~01/STR~|~Resurfacing plan split 111154~|~1~|~1~|~01/IMS~|~Inlet basins on I-280 113123~|~1~|~1~|~01/ENH~|~Plan split for MPO 4TA7 and/or 4TC7 federal funded eligible work with OPWC match on Part 1, PID 113123. 113123~|~1~|~2~|~02/ENH~|~Plan split for MPO 4TA7 and/or 4TC7 federal funded eligible work with Local match on Part 1, PID 113123. 113123~|~1~|~3~|~03/NFP~|~Plan split for 100% local funded items that are OPWC fund eligible on Part 1, PID 113123. 113123~|~1~|~4~|~04/NFP~|~Plan split for 100% local funded items that are non-eligible on Part 1, PID 113123. 113123~|~2~|~5~|~05/ENH~|~Plan split for MPO 4TC7 federal funded eligible work with OPWC match on Part 2, PID 114131. 113123~|~2~|~7~|~07/NFP~|~Plan split for 100% local funded items that are OPWC fund eligible on Part 2, PID 114131. 113123~|~2~|~8~|~08/NFP~|~Plan split for 100% local funded items that are non-eligible on Part 2, PID 114131. 113123~|~2~|~6~|~06/ENH~|~Plan split for MPO 4TC7 federal funded eligible work with Local match on Part 2, PID 114131. 113123~|~1~|~9~|~09/NFA~|~Retroactive fuel price adjustment 116191~|~1~|~1~|~01/NFP~|~Bridge Deck Sealing Project. 102500~|~1~|~1~|~01/STR~|~Chip Seal of CAR-171 98004~|~1~|~1~|~01/STR~|~ROS 772 7.23 (SFN 7105347) Bridge Replacement 98004~|~1~|~2~|~02/STR~|~ROS 772 6.81 (SFN 7105312) Reconstruction 121862~|~1~|~1~|~01/S5K/KCPD~|~Resurfacing the Kokosing Gap Trail. 96537~|~1~|~1~|~01/STR~|~Generic Plan split for rural routes. Routes to be determined later. 96537~|~1~|~3~|~03/NHS~|~Plan split for NHS routes. 96537~|~1~|~2~|~02/S>2~|~Plan split for large urban section on route. 96309~|~1~|~1~|~01/STR~|~0801488 US62 19.820 It is proposed, on US62, 0.1 mile north of Ash Ridge/Anheim Rd (CR27), to repair/replace the liner (SFN 0801488, SLM 19.82). 0801887 US68 40.910 It is proposed, on US68, to repair/replace the liner (SFN 0801887, SLM 40.91). 96309~|~1~|~2~|~02/STR~|~BRO US 62 25.50 91151~|~1~|~1~|~01/STR~|~Maintenance contract for SFY 2013 herbicidal spraying. 100% State. 119852~|~1~|~1~|~01/S>2~|~Intersection improvement at Hilliard Rome and Renner Rd 114606~|~1~|~1~|~01/MPO~|~This plan split includes all work associated with the widening of Fields Ertel 114606~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded work to construct a roundabout at the intersection of Wilkens and Bardes. 79320~|~1~|~1~|~01/S>2~|~Federal/local funding for urban paving in GroveportFRA-317: SLM 5.43-9.0101/S>2/PV/ 79320~|~1~|~2~|~02/S>2~|~100% Groveport funding for pavement work on Saltzagaber02/S>2/PV/GPRT 79320~|~1~|~3~|~03/S>2~|~Federal/state funding for deck patching and sealing:2516268 FRA SR317 7.2 Intersect: Over Csx Rr2516292 FRA SR317 7.2 Intersect: Over Csx Rr2516322 FRA SR317 8.09 Intersect: Blacklick Creek2516357 FRA SR317 8.09 Intersect: Blacklick Creek03/S>2/BR/ 100687~|~1~|~1~|~01/STR~|~Spot paving on the general system 101295~|~1~|~1~|~01/STR~|~FUL-20A-21.08 to 23.94 101295~|~1~|~2~|~02/SAF~|~Center Line Rumble Stripe Plan split -FUL - SR 20A - 21.39 to 23.94 101295~|~1~|~3~|~03/BRO~|~SFN 2600722 98425~|~1~|~3~|~03/S>2~|~Resurfacing MAH SR 625 from 2.59 to 3.04 98425~|~1~|~1~|~01/S>2~|~Major Rehabilitation of MAH US 62 from SLM 9.67 to SLM 13.15. 98425~|~1~|~6~|~06/S>2/YOUN~|~100% city of Youngstown Items along US 62. 98425~|~1~|~4~|~04/S>2~|~Minor bridge work > 20' span. 98425~|~1~|~5~|~05/S>2~|~Minor bridge work 10' to 20' span. 98425~|~1~|~2~|~02/S>2/YOUN~|~Resurfacing MAH US 62 15.20 to 17.18 and MAH SR 170 15.54 to 16.27 and MAH SR 625 3.04 to 3.36, urban paving in the City of Youngstown. 115096~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall. 111084~|~1~|~1~|~01/SAF~|~Intense rainfall caused a landslide to over top a retaining wall blocking sidewalk area and extending onto the roadway necessitating the closure of the road until the slide debris could be removed. The landslide had a width of approximately 90 ft. and extended up the hillside for a distance of approximately 90 ft. 120351~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 111416~|~1~|~1~|~01/SAF~|~TMSO funds plan split 118643~|~1~|~1~|~01/S50~|~Install sidewalks & crosswalks 118643~|~2~|~2~|~02/NFA~|~Install sidewalk and crosswalks on Hillcrest Avenue. 88907~|~1~|~1~|~01/S>2~|~US30 19.16-21.55 minor rehab 96281~|~1~|~1~|~01/NFA~|~Full service maint facility in Ottawa. 116637~|~1~|~1~|~01/NFP~|~Signal Replacements. 84656~|~1~|~1~|~01/IMS~|~IR77 7.51-6.97 84656~|~1~|~2~|~02/IMS~|~See linked structures >20' span. 84656~|~1~|~3~|~03/IMS~|~See linked structure 10' to 20' span. 109505~|~1~|~1~|~01/NFP~|~STA IML Containers Ohio, Inc. Ford Motorway extension. 123682~|~1~|~1~|~01/STR~|~plan split for the bridge work 124832~|~1~|~1~|~01/ENH~|~Funding to cover construction of bike trail 99954~|~1~|~1~|~01/ENH~|~Construction of a 7 foot wide sidewalk on the east side of Montgomery Road from the Bethesda North Hospital main driveway to Weller Road. 100623~|~1~|~1~|~01/IMS~|~Resurfacing of BEL-470 from IR 70 to SLM 6.54 96240~|~1~|~2~|~02/STR~|~Concrete deck overlay 8001952 UNI-38-0.21Concrete deck overlay & paint 8002010 UNI-38-3.21 96240~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.00-7.61 121234~|~1~|~1~|~01/STR~|~Plan split for chip seals 97438~|~1~|~1~|~01/SAE~|~This split is for all guardrail work. This split uses 100% HSIP funds SAC 4HB7. Any funds needed after the cap is reached will be provided by the Allen County Engineer. 105026~|~1~|~2~|~02/NHS~|~1.5" asphalt overlay on FAY US 35 from 17.56 to 24.02 105026~|~1~|~3~|~03/NHS~|~Repair and Sealing on Structures: 2400510, 2400529, 2401002, 2400537, 2400669, 2400685, 2400731 2400766 105026~|~1~|~1~|~01/NHS~|~Erosion Protection (slope repair, rock channel protection, etc.) along US-35 from approximately SLM 18.10 to 22.60. Funded by GSM program 105026~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 95866~|~1~|~1~|~01/NFP~|~@ SLM 2.93 and SLM 3.04 109232~|~1~|~2~|~02/SAF~|~Includes safety improvements of lane modification, turn lane extensions, and signage/signal work near the I-71 interchange 109232~|~1~|~1~|~01/STR~|~Major 2 funded pavement replacement with District funds used beyond the Major 2 funds cap. 109232~|~1~|~3~|~03/SAF~|~Funding for Centerline Rumble Stripes and Longitudinal Joint Preparation 25552~|~1~|~4~|~04/S>2~|~Channel cleanout of #7707657, SSUMSR00162**C : 5.77, O M 040 25552~|~1~|~3~|~03/S>2~|~Urban Paving segment in the City of Akron. SR162 from 5.62 to 7.26 25552~|~1~|~1~|~01/S>2~|~Resurfacing SR-162 from 0.00 to 5.62 and SR162D from 0.00 to 0.08 25552~|~1~|~2~|~02/MPO~|~Urban paving segment...SR162 from 5.62to 7.26. MPO is participating in partial and full depth repairs. Balance from the City of Akron. 104010~|~1~|~1~|~01/SAE~|~Replacement and application of new pavement markings on various county roads in Preble County. 84595~|~1~|~1~|~01/NHS~|~Project entails painting railroad bridges HAM-562-0319 (sfn 3114120) and HAM-562-0319S (sfn 3114112). 84595~|~1~|~2~|~02/IMS~|~Project entails painting railroad structures HAM-71-0752 (sfn 3114937), HAM-71-0774 (sfn 3114996), and HAM-71-0842 (sfn 3115208). 114633~|~1~|~1~|~01/NFP~|~Created for J&C involvement 96970~|~1~|~2~|~02/IMS~|~Diamond grind and repair concrete pavement on MAH-IR 76 eastbound from SLM 7.05 to 8.65 and MAH-IR 80 from SLM 0.00 to 0.53. Also includes a small quantity in the westbound direction. 96970~|~1~|~1~|~01/IMS~|~Epoxy pavement markings on MAH IR 76 from 3.07 to 8.65 and MAH IR 80 from 0.00 to 3.90. 116581~|~1~|~1~|~01/IMS~|~Repair rear and forward abutments on structure FRA-270-22.65 119956~|~1~|~1~|~01/STR~|~added plan split. 100964~|~1~|~1~|~01/S<2~|~Construct Sidewalk 97355~|~1~|~1~|~01/NFP~|~Culvert Replacements 90939~|~1~|~1~|~01/BRO~|~District Allocation 120928~|~1~|~1~|~01/SAF~|~Highway lighting. 120902~|~1~|~1~|~01/STR~|~All work included in this split. Could not choose improvement code in Ellis, should be 47 Bridge Preventive Maintenance 112414~|~1~|~1~|~01/SAF~|~RPM improvement project on various routes and sections in HOC Co. CEAO funded. Funded 100% Federal. 80514~|~1~|~1~|~01/BRF~|~3631559 HIG CR55 5.37 Intersect: Dodson CreekBrdg Replacement 80% Fed/20% Local Match 01/BRF/BR/HIG 116382~|~1~|~1~|~01/S>2~|~Plan Split 1 - All Work. 117361~|~1~|~1~|~01/BRF~|~Bridge rehabilitation. All work is included in this plan split. 113033~|~1~|~1~|~01/NHS~|~For microsurfacing on SR 12 in Hancock County on the NHS. Funds from the District Preservation Program budget. No local funds. 100045~|~1~|~1~|~01/CMQ~|~Re-striping of Montgomery Road from the Norwood corp. line (near Cypress Way) to the Sliverton corp. line (near Coleridge Avenue) from 6 lanes to 5 lanes (two through lanes in each direction and a center turn lane). Traffic signals will be upgraded to 12" LED signal heads. Two existing signals will be rebuilt. 119119~|~1~|~1~|~01/NHS~|~Resurfacing. 122364~|~1~|~1~|~01/NFP~|~NEVI Round 2B - Corridor Group 275-A 122364~|~1~|~2~|~02/NFA~|~NEVI Round 2 Corridor Group 275-A 101834~|~1~|~1~|~01/S<2~|~Urbanized area HUR-99-2-4.49 101834~|~1~|~2~|~02/STR~|~Rural HUR-99-4.49-12.77 123369~|~1~|~1~|~01/SAE~|~100% safety funded as part of target speed pilot program 87902~|~1~|~3~|~03/STR~|~"O3/STR/OT/ " - District Preservation Program 4PF7(80% Federal) / 4PS7 (20% State) - No CAP - Fence Installation on 1) GUE US 40 14.29-14.48; 87902~|~1~|~4~|~04/NFA~|~"O4/NFA/OT/ " - State Safety Program 4BC7 (100% State) - CAP $20,000.00 - Guardrail Installation on 1) PER SR 188 01.12-01.23; 87902~|~1~|~2~|~02/NHS~|~"O2/NHS/OT/ " - Safety Program 4HJ7(100% Federal) - CAP is $875,000.00 - Guardrail upgrade on 1) GUE US22 11.12-30.95; 2) GUE SR209 14.49-14.59 87902~|~1~|~1~|~01/NHS~|~"O1/NHS/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail upgrade on COS SR16 0-0.1 112622~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing of Mahoning Ave from Meridian Rd to IR 680 in the City of Youngstown. 122097~|~1~|~1~|~01/NFA/LIC~|~Licking County CEAO Federal/State Exchange Programs Funding - 4C87 (95% State) / LNTP (5% Local Match) - Replacement of LIC TR 243 04.38 (SNF 4536592). 102991~|~1~|~1~|~01/BRO~|~Bridge replacement project. NOB 821 15.84 (SFN 6105734). BR eligible on rural federal aid. Funded 80 federal/20 state. 110321~|~1~|~1~|~01/NHS~|~Culvert repair project using 80% Federal and 20% State funds on NHS system. ATH US 50 36.57 110321~|~1~|~2~|~02/NHS~|~Culvert repair project using PO. 80% Federal and 20% State funded on NHS system. ATH US 50 36.57. 105561~|~1~|~1~|~01/SAF~|~RPM 113884~|~1~|~1~|~01/STR~|~Widen pavement & shoulders on both sides of the roadway to improve the usability and the safety of this facility. 94630~|~1~|~1~|~01/SAF/Twin~|~Signal upgrade. Widening of the North and South legs of State Route 91 to add left turn lanes at Creekside Drive, City of Twinsburg, Summit County, Ohio. 113010~|~1~|~1~|~01/S<2~|~Contract to demolish a house. MEG Mill Street (CR 5) 0.35, in the Village of Middleport. DSR MEG-001. Funded 80 Federal/20 Local. 93938~|~1~|~1~|~01/IMS~|~Add second right turn lane on exit Ramp E from southbound I71 to Mason Montgomery Road. Improve cross slope for transition from Ramp E onto Mason Montgomery Road. 101167~|~1~|~1~|~01/IMS~|~Overlay I-75 with asphalt concrete : AUG IR 75 SLM 0.00 to 4.51 = = SHE IR 75 SLM 18.83 to 20.55 101167~|~1~|~2~|~02/NHS~|~Overlay with asphalt concrete: AUG US 33 SLM 14.92 to 16.51 118886~|~1~|~1~|~01/STR~|~Resurfacing SR 542 93761~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 556 0.00-13.24. 80/20% Federal/State. 106353~|~1~|~1~|~01/STR~|~HUR-60-10.78/HUR-99-08.04 102856~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funding using SAC 4PS7. 105579~|~1~|~1~|~01/STR~|~Replace Bridge. 110632~|~1~|~1~|~01/STR~|~Overlay on BRO 50 90441~|~1~|~1~|~01/STR~|~Replace deteriorating culvert and improve alignment with minimum amount of approach road work on MER-SR-29 9.110 to 9.120 0.020 113284~|~1~|~1~|~01/STR~|~Replacement of RIC-42-00.41 113284~|~1~|~2~|~02/S<2~|~RIC SR 545 Culvert replacement 120884~|~1~|~1~|~01/S50~|~Resurfacing on SR 117 and SR 309 using District Preservation Funds (4PF7 - 80% and 4PS7 - 20%). 120884~|~1~|~2~|~02/NHS~|~All work on the NHS Route is within this split 120884~|~1~|~3~|~03/IMS~|~All pavement repair work on I-75. 97631~|~1~|~1~|~01/BRO~|~Innovative Bridge Program--bridge deck replacement on HUR-CR 52-3.08. 120342~|~1~|~1~|~01/NFA~|~NEVI Round 2 - 77-A 93341~|~1~|~1~|~01/IMS~|~Construct a type II noise barrier on I-475 between Corey and Woodley 119649~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 13183~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1801775 87180~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on IR 70 throughout Preble County. 104926~|~1~|~1~|~01/NFA~|~Rumpke truck replacement project 119563~|~1~|~1~|~01/SAF~|~Split for guardrail work on the inside lanes, Safety Funding 119563~|~1~|~2~|~02/IMS~|~Split for guardrail work on outside lanes not covered by the safety allocation to be funded with district allocation. 123153~|~1~|~1~|~01/STR~|~District wide culvert replacements. 108175~|~1~|~1~|~01/IMS~|~ER Event - repair landslide that occurred along EB IR-275 98928~|~2~|~2~|~02/STR~|~STP RURAL 98928~|~1~|~1~|~01/NHS~|~NHS 122105~|~1~|~1~|~01/STR~|~Bridge replacement 121592~|~1~|~1~|~01/S>2~|~STP > 200,000 Resurfacing 96349~|~1~|~1~|~01/S<2~|~District Preservation Bridge Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Bridge rehabilitation: 1) SFN 6000339, MUS-22-4.67 carrying US 40 over Jonathan Creek. Not BR Eligible for Rehabilitation: Length=106; SD/FO = (0); SR = 82.6; DSR = 7; 96349~|~2~|~2~|~02/S<2~|~District Preservation Bridge Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Bridge Replacement: 1) SFN 6000398 MUS-22-8.71 carrying US 22 over Shawnee Run . Not BR Eligible for Rehabilitation: Length=31; SD/FO = (0); SR = 70.6; DSR = 5; 121637~|~1~|~1~|~01/NHS~|~Resurfacing 116565~|~1~|~1~|~01/S50~|~plan split for bridge work 88567~|~1~|~1~|~01/NFA~|~HEN-18 from SLM 0.00 to 9.96) 120808~|~1~|~1~|~01/STR~|~Reactive Pavement Maintenance. 120616~|~1~|~1~|~01/NHS~|~Plan split for Urban Paving eligible scope 120616~|~1~|~2~|~02/NHS~|~Plan Split for 100% locally funded scope. 109261~|~1~|~1~|~01/NFP~|~Chips 108012~|~1~|~1~|~01/NHS~|~Lighting 116968~|~1~|~1~|~01/STR~|~WAS SR 60 15.44 CFN 1877880 116968~|~1~|~2~|~02/STR~|~Pile encasement on WAS 60 14.38, SFN 8402728. Funded 80 Federal/20 State. 98147~|~1~|~1~|~01/CMQ~|~Reconstruct three traffic signals in downtown Franklin (Second Street at Riley, Second Street at Main, and Second Street at River Street) with new mast arm signal poles, illuminated signs and Traffic Management Cameras. The intersections will be incorporated into a traffic-responsive closed loop system with fiber optic and radio interconnect across the Great Miami River to Second Street and Miami Ave. The fiber optic cable will be routed into the City Building on Benjamin Way, adjacent to Riley Boulevard. 123472~|~1~|~1~|~01/MPO~|~Construction of the East Broad Street Capital Trail, a road diet on East Broad Street and the reconstruction of 6 traffic signals. 105353~|~1~|~1~|~01/S<2~|~Large City Eligible 105353~|~1~|~2~|~02/NFP~|~County Section, 100% LPA paid 105353~|~1~|~3~|~03/S<2~|~Non-eligible items. 100% LPA 120060~|~1~|~1~|~01/NFA~|~Resurfacing in Jefferson Lake State Park 106352~|~1~|~1~|~01/SAE~|~Federal eligible work to install ADA ramps, sidewalk and curb, pedestrian signals, and pavement markings adjacent to public schools to increase safety while walking or biking to school 110559~|~1~|~1~|~01/S>2~|~Rehabiltate the Bridges that carry SR 122 over the Great miami River and the overflow channel by replacing the expansion joints, upgrading the barriers, painting the structural steel and replacing bearings under the intermiediate expansion joints. Remove Debris from the main channel and consider debris mitigation such as upstream debris deflectors, channel excavation, etc. 110559~|~1~|~2~|~02/SAF~|~The City of Middletown will be paying for the light pole foundations and bump-outs on the bridge parapets. 110559~|~1~|~3~|~03/S>2~|~Resurfacing BUT-SR-122 SLM 6.17 to 6.25 110559~|~1~|~4~|~04/S>2~|~Pavement repairs to be paid by Local. 110559~|~1~|~5~|~05/S5K~|~Plan Split for the retroactive change order for fuel price adjustment 99789~|~1~|~1~|~01/MPO~|~Construction funding to install new or replace existing interconnect within Bexley. 99789~|~1~|~2~|~02/NHS~|~Items to be paid 100% by the City of Bexley 103161~|~1~|~2~|~02/BRO~|~Split for work on the SR-10 bridge 103161~|~1~|~1~|~01/IMS~|~Split for work on the interstate bridges 103161~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 92426~|~1~|~2~|~02/S<2~|~District Allocation 92426~|~1~|~1~|~01/STR~|~District Allocation 115976~|~1~|~1~|~01/S>2~|~This plan split covers all work associated with improving SR-32 and constructing a shared use path from Valley & Round Bottom to the eastern corp. limit of Newtown 20383~|~1~|~1~|~01/STR~|~BR Funds eligible Bridge Replacement 93660~|~1~|~1~|~01/MPO~|~Rehab - lane and shoulder widening 92759~|~1~|~1~|~01/SAF~|~D09 Pavement Markings (B)100% state 105436~|~1~|~1~|~01/NFP~|~All work in this project. 100% state funds from the District Preservation Program budget. 82267~|~1~|~1~|~01/NHS~|~District Allocation 119917~|~1~|~1~|~01/BRO~|~Increase resiliency of bridge carrying SR 149 over Little McMahon Creek by repairing drilled shafts and placing Rock Channel Protection. 91467~|~1~|~2~|~02/SAF~|~Plan Split for all waterworks on Hopkins Road. 91467~|~1~|~1~|~01/SAF~|~ Install left turn lane on US22 from 0.1 miles west to 0.2 miles east of Hopkins Road. 98272~|~1~|~1~|~01/STR~|~STP Rural Microsurfacing: WAY SR 0003 03.85-08.67, ERI SR 0061 00.00-01.74, MED US 0042 07.12-14.40,ASD SR 0511 06.92-10.96, ASD SR 0096 00.00-03.52, WAY SR 0057 00.00-01.25, WAY SR 0057 05.00-10.66 98272~|~1~|~2~|~02/S<2~|~STP<200,000 Microsurfacing WAY SR 0003 08.67-09.07, ASD SR 0511C 00.00-00.04, ASD SR 0511 10.96-11.17, ASD SR 0096 03.52-03.91 103925~|~1~|~1~|~01/STR~|~Culvert Replacement: ASD-60-9.95 102947~|~1~|~1~|~01/NFP~|~Tree/bush removal, pruning 92436~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - District Preservation 4PS7(100% State) - No CAP - Replacement of 1) 1603132 COS SR751 6.58 Intersect: Mineacid Run; Not BR Eligible for Replacement: Length=25 SD/FO(1) SR=62.8 DSR=6; 92436~|~2~|~2~|~02/NFP~|~"02/NFP/BR/ " - District Preservation 4PS7(100% State) - No CAP - Replacement of 1) 1603159 COS SR751 9.05 Intersect: Trib Of Evans Creek; Not BR Eligible for Replacement: Length=15 SD/FO(0) SR=88.8 DSR=6; 92178~|~1~|~1~|~01/IMS~|~100% state preservation funds 113224~|~1~|~1~|~01/ENH~|~Plan split for federally elligible items within construction and construction engineering. 113224~|~1~|~2~|~02/NHS~|~Water main 100% Local 113470~|~1~|~1~|~01/BRF~|~Replacement of linked structure > 20' span. 85370~|~1~|~1~|~01/NHS~|~Federal Earmark OH027 - 100% Federal (4R27) - CAP (See CAP Comment) - Installation of partial interchange lighting at US 33/Hill-Diley Interchange. 85898~|~1~|~1~|~01/NFP~|~construction cost of new facility 91553~|~1~|~1~|~01/STR~|~Deck replacement.Located 1.53 miles West of Lawrence County Line on SR140 7304595 SCI SR140 15.07 Intersect: Jacksons Fork80 Fed/20 State. 01/STR/BR/State 108137~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8 108137~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. 101708~|~1~|~1~|~01/NFP~|~Statewide ITS/FMS maintenance contract 120514~|~1~|~1~|~01/NFP~|~added plan split for Jobs and Commerce sign installation. 99653~|~1~|~1~|~01/NHS~|~Bridge repair using heat straightening on MEG 833 4.89, SFN 5300894. Emergency Type C project. NHS route funded 100% state. 96901~|~1~|~1~|~01/NFA/ADA~|~Plan Splits. 100% Fed. CEAO 113278~|~1~|~1~|~01/SAF/AKRO~|~Safety improvements at various intersections in the City of Akron. Improvements will include enhancements to pavement markings, signage, roadway features (median, curb ramps, sidewalk) and signals. 113278~|~1~|~2~|~02/SAF/CANT~|~Safety improvements at various intersections in the City of Canton. Improvements will include enhancements to pavement markings, signage, roadway features (median, curb ramps, sidewalk) and signals. 113278~|~1~|~3~|~03/SAF/YOUN~|~Safety improvements at various intersections in the City of Youngstown. Improvements will include enhancements to pavement markings, signage, roadway features (median, curb ramps, sidewalk) and signals. 116308~|~1~|~1~|~01/IMS~|~CFNs 1808604 and 1852247 have been linked to IMS plan split 99684~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state 110116~|~1~|~3~|~03/STR~|~This plan split is for the rural routes: portion of CLE-28 and WAR-28. 110116~|~1~|~1~|~01/NHS~|~This plan split is for the NHS routes: CLE-52 110116~|~1~|~2~|~02/S>2~|~This plan split is for the Large Urban routes: portion of CLE-28 122297~|~1~|~1~|~01/STR~|~Plan split for bridge replacement 92673~|~1~|~1~|~01/STR~|~ON SR 121 berm stabilization, pavement planing and resurfacing of the existing roadway with asphalt concrete on DAR SR 121 DAR/PRE County Line (SLM 0.00) to North Corp Limit of the Village of New Madison (SLM 5.64).ON SR 726 resurface the existing roadway with asphalt concrete DAR/PRE County Line (SLM 0.00) to SR 121 (SLM 4.33)(OC 000) 92088~|~1~|~1~|~01/BRO~|~8702462 WOO SR64 12.13 Intersect: Maumee River 92088~|~1~|~2~|~02/MPO~|~This is for the intersection improvement of SR-64 and River Rd. 92088~|~1~|~3~|~03/NFA~|~Split for Utility Conduits - Spectrum - 2 of 6 conduits on bridge 92088~|~1~|~4~|~04/NFA~|~Utility Conduit Split for CenturyLink - 2 of 6 conduits 92088~|~1~|~5~|~05/NFA~|~Utility Conduit Split for Buckeye Broadband - 1 of 6 conduits 92088~|~1~|~6~|~06/NFA~|~Utility Conduit Split for Northern Buckeye Educational Council - 1 of 6 conduits 92088~|~1~|~7~|~07/S>2~|~Urban Paving Split - paving added by change order will use this funding code. Luc SR 64 SLMs 0.03 to 0.32 96788~|~1~|~1~|~01/NHS~|~General System Resurfacing on COL-30 and COL-154 including pavement repairs and pavement markings. 93643~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. VIN 327 6.89-13.56. Federal 80%/State 20% STP Rural. 83827~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 677 0.00-4.78. Rural other federal aid using 80 federal/20 state funds. 98401~|~1~|~1~|~01/NHS/ASHT~|~Resurfacing ATB US 20 from 11.02 to 11.83 in the City of Ashtabula. 101042~|~1~|~1~|~01/STR~|~STA SR 44 from 0.00 to 7.84STA SR 171 from 0.00 to 1.00 119308~|~1~|~1~|~01/SAE/GCEO~|~Installation of guardrail at various routes in Greene County 106257~|~1~|~1~|~01/STR~|~Work funded with funds from the District Preservation Program budget. No local funds. The District has committed to pay for the top 3 inches of asphalt on SR 103. The District will also pay for pavement markings. 106257~|~1~|~2~|~02/STR~|~This is for all the project not funded with funds from the District Preservation Program budget. Currently it is unfunded. After funds are received the work may be in more than one split. 87507~|~1~|~1~|~01/S>2~|~Project includes minor widening, pavement rehabilitation, access management involving realignment of driveways, new sidewalks, ADA compliant ramps, curb replacement, retaining wall, replacement of signage, replacement of catch basins and storm sewer, and reconstruction of the existing traffic signal at the intersection of Towne Blvd. and Village Dr. 105260~|~1~|~1~|~01/NHS~|~Plan split for bridge painting work 105260~|~1~|~2~|~02/IMS~|~Added plan split for interstate structure 109800~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - No CAP - 80% Federal (4PS7) and 20% State - resurfacing and related work on KNO-36-20.85 to 29.50 and KNO-36C-0.00 to 0.12 109800~|~1~|~2~|~02/S<2~|~02/S<2/PV/ - Plan SPlit 2 for work on KNO-36-20.82 to 20.85 107664~|~1~|~1~|~01/NHS~|~Replace deck on continuous steel beam bridge BEL-7-2591 (SFN 0700827) and repair substructure units. Replace bearings and paint beam ends. 88430~|~1~|~1~|~01/SAF~|~Safe Routes to School funding for Hague Ave RR pedestrian crossing, Hague Ave shared use path, Valleyview shared use path 88430~|~1~|~2~|~02/S>2~|~Local funding (FRA County Eng Office) for bridge replacement on Hague Ave 84818~|~1~|~1~|~01/BRF~|~Remove existing bridge and place a new precast, reinforced, non-composite box beam deck superstructure on reinforced concrete, stub, capped pile abutments while completing associated roadway approach reconstruction on Watkins Road in Mercer County SFN 5443059 MER CR 10 1012 117127~|~1~|~1~|~01/ENH/GAMB~|~"01/ENH/OT/GAMB" - construction of shared use pathway. 116270~|~1~|~1~|~01/NFA~|~Chip Seal in Brown County. 92947~|~1~|~1~|~01/NFP~|~Culvert replacements on various routes throughout Stark County, Ohio. 84867~|~1~|~1~|~01/IMS~|~Partial depth pavement repairs from SLM 0.00-14.9801/IMS/PV/ 124696~|~1~|~1~|~01/SAF~|~Reconfigure Cassady Ave from Demonye Rd to Plaza Properties Blvd. Improvements include widening for a median between Airport Dr and Plaza Properties Blvd, signal improvements, SUP, sidewalk, and restriping. A dual SBL turn lane will be installed at Airport Dr and dual receiving lanes are proposed on the 670 entrance ramp. The off ramp will be modified to include a dedicated right turn lane. The intersection of Airport Dr and Cassady Ave will be aligned to alleviate the offset. 89408~|~1~|~1~|~01/IMS~|~Plan split for all paving work. 124880~|~1~|~1~|~01/MPO~|~Plan Split for construction of a shared use path using NOACA TLCI funding 117014~|~1~|~1~|~01/MPO/XEN~|~Mill and resurfacing of E. Market Street from N. Detroit Street to N. Columbus Street with pavement repairs. Sidewalk and curb repair. 123546~|~1~|~1~|~01/NFP~|~added RPM 31 113169~|~1~|~1~|~01/MPO/MUNR~|~Resurfacing of Munroe Falls Ave from W Corp Limit to Main St (SR 91) in the City of Munroe Falls. 116727~|~1~|~1~|~01/SAE~|~Install and upgrade guardrail on various county roads in Seneca County. 123725~|~1~|~1~|~01/SAF~|~Sign replacement. 91887~|~1~|~1~|~01/NHS~|~Resurfacing ATB SR 11 from 0.00 to 8.05. 91887~|~1~|~2~|~02/NHS~|~Resurfacing of ATB SR 11 rest area parking lot and ramps. 99856~|~1~|~1~|~01/ENH~|~Construction of a sidewalk on the north side of Montgomery Road (US-22/SR-3) from Galbraith Road to Sturbridge Drive. Sidewalk to be constructed against curb and improvements require adjustment of driveway profiles and construction of retaining walls as needed. 95148~|~1~|~1~|~01/NFP~|~District Preservation Fast Dry Pavement Markings - 4PS7 (100% State) - No CAP - District Wide application of fast dry auxillary markings. 93510~|~1~|~1~|~01/NFA~|~Improve turning radii at intersection of MRG SR 60 and MRG TR 275 0.00-0.09 (Buttermilk Hill Rd). Rehabilitate pavement including minor widening for 0.09 mi. along TR 275. Work includes improving commercial drive for an improved turning radius for trucks. 120486~|~1~|~1~|~01/S5K~|~Crosswalk 94294~|~1~|~1~|~01/NFP~|~Construct a mixing shed and a salt storage facility at NOB M&R Garage. 98636~|~1~|~1~|~01/STR~|~SFN 1100718, CHP-36-0804 - change from hard deck overlay to New Bridge (discussed with Lee on 7/8/14 agrred to modify to composit box beam superstructure replacement only.) 98636~|~1~|~2~|~02/STR~|~Future change order work. 110064~|~1~|~1~|~01/S<2~|~Landslide repair project. GAL 588 11.10. 100% State ER funded. 115453~|~1~|~1~|~01/SAF~|~safety pedestrian improvements 109485~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 101466~|~1~|~1~|~01/STR~|~Pavement Marking 122678~|~1~|~1~|~01/SAF~|~Installation of median cable barrier. 109828~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements. 88849~|~1~|~1~|~01/STR~|~Bridge Replacement 88849~|~1~|~2~|~02/STR~|~Culvert Repair 91967~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of HAS-151-0.00 to 4.58; includes pavement repairs, pavement marking 123784~|~1~|~1~|~01/NHS~|~nhs 84658~|~1~|~3~|~03/NHS~|~See linked bridges. 84658~|~1~|~2~|~02/S>2~|~Fine graded polymer asphalt overlay to SUM SR 303 from 10.00 to 10.57. 84658~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay for SUM SR 8 from 4.31 to 7.98. 84658~|~1~|~4~|~04/NHS/AKRO~|~Micro-surfacing of State Route 261 between North Main Street (SLM 11.33) to State Route 8 (SLM 11.87), in the City of Akron, Summit County, Ohio. 109035~|~1~|~1~|~01/NFP~|~J&C project 95744~|~1~|~1~|~01/NHS~|~HEN-6 from SLM 0.00 to SLM 10.94 95744~|~1~|~2~|~02/STR~|~SR-34 123641~|~1~|~1~|~01/NFP~|~Plan split for sign maintenance, repair or replacement 92789~|~1~|~1~|~01/NFA~|~Part 1 HIG CR5 14.29 - 18.77 It is proposed on CR5 to use HSIP funds to widen the pavement, widen the RW to remove fixed objects, and widen the narrow culverts from SLM 14.29 to 18.77. 80 Fed/20% local match by Highland County 92789~|~1~|~2~|~02/STR~|~Part 2, on SR73, SLM 14.96 - 15.34, at its the intersection with Prospect Road, it is proposed to improve the sight distance and stopping sight distance of this intersection by correcting the vertical curves located in advance of this intersection. 80/20 using perservation funds. 109030~|~1~|~1~|~01/NHS~|~Conduit Work:WAY US 0250 28.64 CFN 1981036:SPOT TREATMENTS 109042~|~1~|~1~|~01/NHS~|~Landslide repair. 95472~|~1~|~1~|~01/IMS~|~Intallation of tower lighting at the Interchange of IR-90 and SR-11 in Plymouth Township, Ashtabula County, Ohio. 86934~|~1~|~3~|~03/S>2~|~Resurfacing SR 93 from 5.84 to 6.38. 86934~|~1~|~2~|~02/NHS~|~Catch Basin Repair on US 30 from 0.36 to 12.60. 86934~|~1~|~1~|~01/STR~|~Plan Split for resurfacing of State Route 93 from 6.38 to 11.71 and SR 93A 0.00 to 0.03, Stark County, Ohio. 119897~|~1~|~1~|~01/STR~|~Plan split for slide repair 93701~|~1~|~1~|~01/STR~|~80/20 split between federal and local for the resurfacing of Ravenna Road (CR-601) using MPO STP funds. 121793~|~1~|~1~|~01/SAF~|~PM on various CR. 99228~|~1~|~1~|~01/BRF~|~Replace the superstructure of Bridge No. CLI-CR 2-0.25 (SFN: 1430114) which carries Spring Hill Road over Todd's Fork. 102664~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% Federal and 20% State funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 8802378. 120064~|~1~|~1~|~01/NFA~|~NEVI Round 2 270-B 87886~|~1~|~1~|~01/IMS~|~Remove existing slab superstructure on two bridges on IR 70 (BEL-70-0050 L & R, SFN 0701831, 0701866) with a new slab supestructure. The pier caps will be replaced and abutments rehabilitated. 86209~|~1~|~1~|~01/STR~|~Bridge rehabilitation UNI SR47 7.33 over Bokes Creek 86209~|~1~|~2~|~02/STR~|~Replace UNI SR47 9.16 over Lindsey Ditch with box culvert 86209~|~1~|~3~|~03/STR~|~Replace structure UNI-347-10.37 over Fulton Creek 96560~|~1~|~2~|~02/S<2~|~POR SR 82 from 13.80 to 17.89. 96560~|~1~|~1~|~01/S>2~|~TRU SR 45 from 0.00 to 5.78TRU SR 534 from 3.75 to 4.02 and 5.52 to 5.67. 96560~|~1~|~3~|~03/STR~|~POR SR 44 from 19.18 to 22.14 and 24.19 to 26.76TRU SR 5 from 30.95 to 32.51TRU SR 5D from 0.00 to 0.07TRU SR 82 from 0.00 to 1.63TRU SR 534 from 5.67 to 7.94 82916~|~1~|~2~|~02/STR~|~Resurfacing on State Route 14 from SLM 17.44 to 18.07, in Portage County, Ohio. 82916~|~1~|~1~|~01/NHS~|~Paving of State Route 14, from SLM 11.19 to 12.40, 12.90 to 17.44, in Portage County, Ohio. 82916~|~1~|~3~|~03/NHS~|~Bridge Rehab of SFN# 6700667, SFN# 6700691, SFN# 6700748, SFN# 6700756, and SFN# 6700810, in Portage County, Ohio. 82916~|~3~|~5~|~05/NHS~|~Hayes Road realignment at State Route 14. Portage County, Ohio. 82916~|~2~|~4~|~04/NHS~|~Bridge replacement of SFN# 6700780 over Milk Creek, Portage County, Ohio. 100600~|~1~|~1~|~01/STR~|~Resurfacing of TUS-93 including asphalt concrete overlay, pavement repairs and pavement markings. 103713~|~1~|~1~|~01/STR~|~BRO SR 41 3.34 Safety Project. 119726~|~1~|~1~|~01/NFA~|~Created Plan Split for TED Involvement 93700~|~1~|~1~|~01/IMS~|~01/IMS/PV ; District Preservation 4PF7 (90%) / 4PS7 (10%) - No Cap - Pavement and Joint repair on HAN-IR75 from log 3.22 to log 14.39 108968~|~1~|~1~|~01/SAF~|~SRTS Inf. project 96334~|~1~|~1~|~01/STR~|~It is proposed to resurface SR41 beginning at the Highland County line SLM 0.00 and terminate at the Ross County line SLM 5.20. This does not include the Ross County section of 0.00 - 0.42 nor the Pike County section of 5.20 - 5.39. 97539~|~1~|~1~|~01/BRF~|~Ohio Bridge Partnership Program - Bridge Replacements 123915~|~1~|~1~|~01/MPO~|~Resurfacing of SR 73 from Deardoff Road to Commerce Center Drive. 101310~|~1~|~1~|~01/STR~|~Pavement work on FAY SR 207, MAD SR 207, MAD US 62 and MAD US 62D 120824~|~1~|~1~|~01/CMQ~|~Plan split for MPO CMAQ eligible scope items 113092~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 113092~|~1~|~3~|~03/NHS~|~Minor bridge rehab 10' to 20' span. 113092~|~1~|~1~|~01/NHS~|~Resurfacing. 87008~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MOE 7 0.00-2.21, NHS route, Federal 80% and State 20%. 123307~|~1~|~1~|~01/NHS~|~Turn lane improvement/extension at the intersection of SR 16/Licking Valley Road in Licking County. 123307~|~1~|~2~|~02/NFA~|~Remove River Road's access to SR 16 EB with the construction of a turnaround. 80184~|~1~|~4~|~04/BRO~|~Bridge Work ERI-013-03.67 sfn:2202409 80184~|~1~|~2~|~02/STR~|~District Allocation Resurfacing ERI-013-01.97 - 06.52 80184~|~1~|~3~|~03/S<2~|~District Allocation Resurfacing ERI-013-01.84 - 01.97 80184~|~1~|~1~|~01/NHS~|~District Allocation - Resurfacing ERI-013-06.52 - 06.92 98682~|~1~|~1~|~01/NFA~|~Bridge rehabilitation with correction of roadway approach geometric parameters. CR 196 1.58 SFN 5450861 116437~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4. 89032~|~1~|~2~|~02/ENH~|~80/20 fed/local split for all streetscape work using enhancement funds which is capped @ $760,000. 89032~|~1~|~1~|~01/MPO~|~80/20 fed/local split for all pavement work using MPO STP funds whichis capped @ $3,504,000. 89032~|~1~|~3~|~03/NFP~|~100% local participation for items of work not eligible for federal funding and cost above capped funded sources. 88743~|~1~|~1~|~01/IMS~|~Districtwide Raised Pavement Marker Program. 97535~|~1~|~1~|~01/NFP~|~Repair of Building C roof at District 4 Arlington headquarters. 116699~|~1~|~1~|~01/STR~|~For work on SR697 in Van Wert County in the rural area outside the city of Delphos from SLM 0.00 to 5.50. District Preservation Funds. 116699~|~1~|~2~|~02/S5K~|~For work on SR697 in Van Wert County within the city of Delphos from SLM 5.50 to 6.57. District Preservation Funds. 116864~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE 379 1.74 SFN 5602734. 123052~|~1~|~1~|~01/SAF~|~Plan split for sign replacement work 92326~|~1~|~1~|~01/NFA~|~Deck replacement on ATH 690 4.74, SFN 0505404. Work includes pile encasement. 100% State. 115708~|~1~|~1~|~01/NFP~|~Loop detector maintenance. 94191~|~1~|~2~|~02/NHS~|~Plan Split for the NHS portion of US 68. Limits are GRE-68 from SLM 7.71 - 8.75 94191~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on all lanes on US 68 from I-71 to just before Boyd. CLI US 68: SLm 20.48-23.32 and GRE US 68: SLM 0-5.24 94191~|~1~|~3~|~03/IMS~|~All work to resurface the ramps from IR 71 to/from US 68 101075~|~1~|~1~|~01/IMS~|~Concrete Pavement Repair on ATB-IR 90-3.70 to 7.58. 101075~|~1~|~2~|~02/IMS~|~See linked structures >20' span. 101759~|~1~|~1~|~01/MPO~|~Mill and fill Main St from McCleary-Jacoby St to Walnut St and Erie St to SR 11, in the City of Cortland, Trumbull County, Ohio. 87000~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay. MOE 255 0.00-18.08. Not on any federal aid system funded 100% state. 105590~|~1~|~1~|~01/STR~|~CRA-30 20.76 L&R, MED-IR-0071-19.92 L&R, WAY SR 0302-13.79, RIC-IR-0071-15.28 L&R, WAY SR 0003-11.76 L&R 100789~|~1~|~1~|~01/NFP~|~Pavement marking 96344~|~1~|~1~|~01/NHS~|~SR-25 from SLM 7.01 to SLM 7.82 96344~|~1~|~2~|~02/NFA~|~100% City of Toledo funding for requested additions to construction project 107223~|~1~|~1~|~01/MPO~|~MPO funded 107223~|~1~|~2~|~02/NHS~|~NHS Urban Paving - 80/20 Fed/City SLM 16.07 to 17.49 107223~|~1~|~3~|~03/NHS~|~100% City of Huron Items SLM 16.07 to 17.49 94880~|~1~|~1~|~01/SAF~|~Continue to update the retro-reflectivity on approximately 90 stop signs, 20 regulatory signs and 10 warning signs on various streets within the City of New Carlisle. 115525~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 95929~|~1~|~2~|~02/NHS~|~Replace expansion joints, refurbish bearings, overlay with LMC and patching. Bridge # LOG-33-1596 L SFN 4600843. 95929~|~1~|~1~|~01/NHS~|~Replace expansion joints & abutment bearings, patching and SRS deck on bridge numbers LOG-33-1468 L/R SFNs 4600576 and 4600606 and LOG-33-1533 L/R SFNs 4600789 and 4600819. 113888~|~1~|~1~|~01/NFA~|~Culvert replacements, ditching and shoulder grading to improve drainage on MOE CR 15, 105, 68 and 88. FLAP funded. 110356~|~1~|~1~|~01/SAF~|~PROFILE ADJUSTMENT TO IMPROVE SIGHT DISTANCE AND INTERSECTION RADII 113803~|~1~|~1~|~01/BRO~|~Replacement of SFN 7033044 112903~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-37-0.00-6.93 112903~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split: DEL-37-6.93-7.47 91501~|~1~|~1~|~01/STR~|~A FHWA Disaster OH11-02 flood project. DSR: JEF-002: Embankment Failure. Slip in embankment below roadway threatens the road. 112815~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 91844~|~1~|~1~|~01/STR~|~Asphalt resurfacing on HAS-250 and Fine Graded Polymer Asphalt resurfacing on HAS-9 95338~|~1~|~1~|~01/SAE~|~Guardrail replacement and upgrade on various county roads. 83041~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation funding - No CAP's - Crack sealing - Cos-SR 16-00.00 to 08.93 83041~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No Cap's - Crack sealing - Cos-SR 541-31.87 to 34.62; Cos-SR 79-00.00 to 12.37; Cos-SR 83-00.00 to 09.02; Gue-SR 146-00.00 to 09.86; Kno-US 36-00.00 to 14.98; Gue-SR 541-00.00 to 08.89; Gue-US 22-14.66 to 31.04; Gue-US 22-00.00 to 04.08; Kno-SR 3-20.61 to 34.71 83041~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation Funding - No CAP's- Crack sealing - Kno-US 36-14.98 to 16.53; Gue-US 22 04.08 to 06.00; Kno-SR 3-18.95 to 20.61 107900~|~1~|~1~|~01/IMS~|~OH18-01 ER Event. Landslide repair project. WAS 77 16.61, DSR WAS-007. Interstate route funded 100% federal ER. 104626~|~1~|~1~|~01/MPO~|~Resurfacing Mecca Street in the City of Cortland. 120007~|~1~|~1~|~01/NFA~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 117500~|~1~|~1~|~01/BRF/CCEO~|~Replacement of the existing superstructure. 110587~|~1~|~1~|~01/SAF~|~Improvements at the intersection of FRA SR 3 (Cleveland Ave) and Hudson St 112833~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 112833~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span. 112833~|~1~|~4~|~04/STR~|~Minor bridge rehab 10' to 20' span. 112833~|~1~|~1~|~01/STR~|~Resurfacing, includes major rehab funds. 113260~|~1~|~1~|~01/MPO~|~Split for MPO fund federal-aid eligible work. 113260~|~1~|~2~|~02/SAF~|~Split for safety funded traffic control items 113260~|~1~|~3~|~03/NFP~|~Plan split for installation of turn lane and non-eligible work at 100% local cost. 93835~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: On SR138, located 1.12 miles west of SR753. Project Description: It is proposed to replace the structure, SFN 3603393. 80/20 Split01/STR/BR/State 101199~|~1~|~1~|~01/SAE~|~Complete various coutermeasures including replacing curb ramps, installing countdown pedestrian signal heads, improving school zone signage, installing speed humps, and installing warning signs to improve safety of students walking and biking to school. 101199~|~1~|~2~|~02/SAE~|~PID 103746 - Complete carious countermeasures including replacing curb ramps, installing countdown pedestrian signal heads, improving school zone signage, installing speed humps and installing warning signs to improve safety of students walking and biking to school. 93961~|~1~|~1~|~01/S>2~|~Urban Paving eligible items between SLM 11.66 to 13.28 93961~|~1~|~2~|~02/NFP~|~Urban Paving Ineligible items. 25516~|~1~|~1~|~01/STR~|~3502945 HEN SR109 9.88 Intersect: South Turkeyfoot Creek 82553~|~1~|~1~|~01/MPO~|~This project will provide a new network connection from Mt. Carmel-Tabasco Road on Old State Route 74 approximately 7000 feet to Eastgate Boulevard. Project right-of-way width will address highway, rail transit, and pedestrian facilities consistent with the Eastern Corridor Record of Decision related to TSM actions and preservation of the Wasson Rail Transit Corridor. Addition of curb and gutter storm drainage, paved shoulders, and street lighting and landscaping will be provided where applicable. CCTID will provide travel demand modeling and certified traffic through existing TDM Task Order. The project will include the addition of curb and gutter storm drainage, paved shoulders, street lighting, ladscaped medians where applicable. Project will require right-of-way widths varying from 60 to 90 feet and is a critical maintenance of traffic element for the I-275/S32 Interchange project. Clermont County TID 82553~|~1~|~2~|~02/ENH~|~Plan split for the following Transportation Altnernatives Program eligible items: portion of embankment associated with sidewalk construction, new sidewalks, lighting, and retaining walls required for sidewalks. 93710~|~1~|~2~|~02/IMS~|~Culvert Repair RIC-071-18.90 93710~|~1~|~1~|~01/NHS~|~Culvert Repairs RIC-030-05.20 / RIC-030-06.60 / RIC-030-17.34 88632~|~1~|~1~|~01/STR~|~Two lane resurfacing of SR-656 from DEL County line to SR-229 94561~|~1~|~1~|~01/BRF~|~SFN 2531453. FRA-CR20 (Smothers Road) over Hoover Reservoir. 113113~|~1~|~1~|~01/NFP~|~2026 Operations Chip Seals 90988~|~1~|~1~|~01/SAE~|~A safe routes to school funded project to repair/construct sidewalks in the Village of Put-in-Bay OTT CR215 0.4-0.41 104289~|~1~|~1~|~01/NHS~|~Pruning, Tree/Bush removal 123070~|~1~|~1~|~01/BRF~|~Bridge replacement. 116411~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 124323~|~1~|~1~|~01/STR~|~All work included in this split. 122975~|~1~|~1~|~01/BRO~|~Plan Split for Municipal Bridge funded scope. 109571~|~1~|~1~|~01/IMS~|~Interchange lighting at various locations: WAR-IR 71/SR 741 WAR-IR 71/Wilmington HAM-IR 275/RR Hwy 109571~|~1~|~2~|~02/NHS~|~Interchange lighting at various locations: GRE-US 35/US 35B 116826~|~1~|~2~|~02/STR~|~Resurfacing. 116826~|~1~|~1~|~01/S>2~|~Resurfacing. 117525~|~1~|~1~|~01/IMS~|~Plan Split to reconstruction the existing pavement on HAM-75 117525~|~1~|~2~|~02/IMS~|~Pavement - added capacity for the new 4th lane in each direction. This split also includes four alternate bid items for MSD work. These drainage alternates are for 69th Street (STA 481), Seymour (STA 492), Woodland (STA 525), and Summit. 117525~|~1~|~3~|~03/IMS~|~Bridge plan split to reconstruct the bridge for the additional 4th lane 99535~|~1~|~1~|~01/IMS~|~Resurfacing work funded at 90/10 fed/state. 105739~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items 108675~|~1~|~1~|~01/STR~|~ER Event OH18-01. Landslide repair project. WAS 550 14.30. DSR WAS-017. Rural other federal aid funded 100% federal ER. 92880~|~1~|~1~|~01/S>2~|~Urban paving - 80/20 - District Allocation/City of Avon 92880~|~1~|~2~|~02/S>2~|~Urban paving - 80/20 - District Allocation/City of Avon Lake 92880~|~1~|~3~|~03/S>2~|~City of Avon 100% Local items. 81360~|~1~|~3~|~03/BRO~|~Work on FRA-270-27.92 SFN 2511584 BR eligible 81360~|~1~|~1~|~01/IMS~|~Minor pavement rehab on FRA-270: 26.49-29.38 and guardrail work01/IMS/PV/ 81360~|~1~|~2~|~02/IMS~|~Minor bridge work (patching & sealing - non BR eligible) for 6 bridges:2511657 FRA IR270 28.01 Intersect: Over Alum Creek2511673 FRA IR270 28.55 Intersect: Cd Road O Abandonded Rr2511703 FRA IR270 28.55 Intersect: Cd Road O Abandoned Rr2511770 FRA IR270 28.55 Intersect: Over Abandoned Rr2511797 FRA IR270 28.71 Intersect: Rt Cd Road Over Sr 32511878 FRA IR270 28.71 Intersect: Over St Rt 302/IMS/BR/ 96098~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - District Preservation Bridge Funding 4PS7(100% State) - No CAP - Repaire of 3001237 GUE IR 70 09.43 Intersect: Wills Creek & CR 35; Not BR Eligible for Replacement: Length=293 SD/FO(2) SR=85.0 DSR=6 96098~|~1~|~2~|~02/NFP~|~"02/NFP/BR/ " - District Preservation Bridge Funding 4PS7(100% State) - No CAP - Repair of strike detection equipment and 3001202 GUE IR 70 09.43A Intersect: Wills Creek & CR 35; Not BR Eligible for Replacement: Length=304 SD/FO(2) SR=87.6 DSR=7 100301~|~1~|~1~|~01/NFA~|~Provide a network of bicycle stations in the Downtown Cleveland and University Circle. 121152~|~1~|~1~|~01/BRO/STCE~|~Bridge rehab. 96381~|~1~|~1~|~01/SAF~|~Improvements on the N side of Canal Street (SR47) from the existing sidewalk on school property to the midblock crosswalk for the nearby mobile home park where Rectangluar Rapid Flashing Beacons (RRFBs) will be installed. 106761~|~1~|~1~|~01/IMS~|~Drainage modification to prevent flooding on IR-480 89019~|~2~|~2~|~02/NFP~|~District Preservation 4PS7 (100% State) - No CAP - Rehabilitation on 3006638 GUE SR662 2.4 Intersect: Over Indian Camp Run; Not BR Eligible for Rehabilitation: Length=73 SD/FO(0) SR=84.0 DSR=6 89019~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3003876 GUE SR146 9.81 Intersect: Buffalo Fork; Not BR Eligible for Rehabilitation: Length=116 SD/FO(0) SR=98.1 DSR=7 109758~|~1~|~1~|~01/STR~|~AC overlay 109758~|~1~|~2~|~02/S<2~|~AC overlay 109758~|~1~|~3~|~03/NFA~|~AC Overlay 109758~|~1~|~4~|~04/NFP~|~Adding state ER. 113074~|~1~|~1~|~01/NHS~|~Perform concrete pavement repairs 113074~|~1~|~2~|~02/NHS~|~Patching concrete structure, removal of existing coatings, and sealing of concrete surfaces 95563~|~1~|~1~|~01/NHS~|~HIG US 50 (12.27-12.69/14.61-14.65/14.81-14.98)80% Fed / 20% State 95563~|~1~|~2~|~02/NHS~|~HIG US 50 (12.69-14.61/14.65-14.81)80% Fed/20% Local match by City of Hillsboro 101619~|~1~|~1~|~01/ENH~|~Work funded with federal funds through the Transportation Alternatives Program. 95% federal funds using Toll Revenue Credit (TRC) with the 5% match provided by Putnam County. Funds needed over the capped amount will be provided by Putnam County. 115275~|~1~|~1~|~01/IMS~|~Plan split for pavement major rehab 84744~|~1~|~1~|~01/STR~|~Resurfacing 122836~|~1~|~1~|~01/SAE~|~Roundabout 120306~|~1~|~1~|~01/NFA/YOUN~|~Remove bridge. 97426~|~1~|~1~|~01/SAE~|~Installation of new and reconstruction of existing guardrail on various County roads. 122812~|~1~|~1~|~01/ERD~|~Minor realignment of the Valley Road intersection with Dumford Road. Addition of a west leg to the intersection and construction of phase 1 of the new roadway connecting Valley Road to Indian Ripple Road. 98770~|~1~|~1~|~01/NFA~|~Plane and resurface the Armstrong Museum parking lot. 106238~|~1~|~1~|~01/NHS~|~Culvert repairs to 0249, 0278, 0632, 0703 and 0712 under US 50, Hamilton County. 106200~|~1~|~1~|~01/NFP~|~D04 FY 2023 culvert repair/replacements. 106200~|~1~|~2~|~02/NFP~|~Catch basin repair. 95679~|~1~|~1~|~01/MPO~|~Boyer/Schoonmaker Vessel. 99067~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control - 2 lane highway - DAR/MER/SHE/MIA 97369~|~1~|~1~|~01/SAF~|~Installation and replacement of guardrail on various county roads in Greene County. 103652~|~1~|~1~|~01/IMS~|~Install median/cable barrier along MAH IR 680 from 2.06 to 3.86. 117942~|~1~|~1~|~01/NFP~|~Installing recessed wet reflective pavement markings on various routes throughout District 4. 92365~|~1~|~2~|~02/STR~|~3 bridges 92365~|~1~|~1~|~01/STR~|~resurface LUC SR 295 19.54-21.45 - Berkey Corp Line to Michigan State Line 110031~|~1~|~1~|~01/SAE~|~Resurface US-22 and restripe to 5 lanes between Old Mille Rd and Creekwoods Place/Old 3C Highway. 100939~|~1~|~2~|~02/NHS~|~Resurfacing of STA US 62 from 0.86 to 0.93 and STA SR 21 from 0.00 to 5.47. 100939~|~1~|~1~|~01/IMS~|~Resurfacing of STA IR 77 from 12.80 to 17.62. 100939~|~1~|~3~|~03/STR~|~Resurfacing of STA US 62 from 0.00 to 0.86 and STA SR 619 from 7.36 to 14.74. 99725~|~1~|~1~|~01/NHS~|~Resurfacing of Canton Road from Salmon Drive to approximately 500' south of Springfield Lake Drive. 92419~|~1~|~1~|~01/NFA~|~Grading and resurfacing existing parking lots and drives at Eastwood metro park. 119964~|~1~|~1~|~01/CMQ~|~Widen Shakertown Road from Carthage Drive to Southern Belle Blvd. including curb, gutter and installation of sidewalk. 114006~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items using SAC 4HJ7 104699~|~1~|~1~|~01/NFA~|~Replace traffic &/or CS building at D7 HQ. 88331~|~1~|~1~|~01/S<2~|~Safe Routes to School program. Various location thoughout the Coty of Mansfield 97837~|~1~|~1~|~01/SAF~|~SRTS funding for ped crossing 105285~|~1~|~1~|~01/STR~|~Resurfacing of HOL-62 102002~|~1~|~1~|~01/NFP~|~District 4 one year mowing contract along interstate and interstate look-a-likes in Portage, Stark and Summit Counties. 87076~|~1~|~1~|~01/NHS~|~Priority System - Minor Rehab. on BEL-7-23.45 to 26.44 and JEF-7-0.00 to 0.16; includes asphalt resurfacing to address any structural deficiencies, pavement marking 94450~|~1~|~1~|~01/BRF~|~"01/BRF/BR/LCEO" - CEAO LBR Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP of $405,600.00 LBR funding @ 80% plus $76,050.00 Credit Bridge Program credit @ 15% - Replacement of 4540018 LIC CR315 1.35 Intersect: Claylick Crk; BR Eligible for Replacement: Length=34 SD/FO(1) SR=37.0 DSR=" " 85135~|~1~|~1~|~01/S>2~|~Minor pavement rehab on US 50 in Clermont County from eastern Milford corp to the Village of Marathon. This split for the Urban portion of the pavement between SLM 2.21 to 5.13 and between SLM 10.76 to 11.54. 85135~|~1~|~3~|~03/S>2~|~Project includes minor bridge work to structures CLE-50-0225 (sfn 1300830), CLE-50-0381 (sfn 1300857), CLE-50-0451 (sfn 1300911), and CLE-50-1133 (sfn 1301063). 85135~|~1~|~2~|~02/STR~|~Minor pavement rehab on US 50 in Clermont County from eastern Milford corp to the Village of Marathon. This split for the Rural portion of the pavement between SLM 5.13 to 7.75 and between SLM 8.75 to 10.76 and between SLM 11.54 to 18.08. 85135~|~1~|~4~|~04/STR~|~Project includes minor bridge work for structures CLE-50-0546 (sfn 1300946), CLE-50-0584 (sfn 1300954), CLE-50-0678 (sfn 1301004), CLE-50-0745 (sfn 1301039), CLE-50-1264 (sfn 1301144), CLE-50-1499 (sfn 1301187), CLE-50-1589 (sfn 1301217) and CLE-50-1760 (sfn 1301233). 92502~|~1~|~1~|~01/MPO~|~Replace and widen Eastgate Blvd bridge and widen approaches to bridge to accommodate new ramps to/from SR32. Include improvements to Eastgate North Frontage Road to accommodate ramp connection for SR32 westbound. Include ramp construction for west SR32. East SR32 ramp connection will be included in a future project. 92502~|~1~|~2~|~02/BRF/CLE~|~Replace bridge SFN 1300202 102838~|~1~|~1~|~01/MPO~|~Intersection Improvement. 117340~|~1~|~1~|~01/BRF~|~Bridge replacement. All work in this plan split. 102873~|~1~|~1~|~01/IMS~|~Plan Split 01 created for interstate routes 102873~|~1~|~2~|~02/NHS~|~Plan Split 02 created for NHS routes 102873~|~1~|~3~|~03/STR~|~Plan Split 03 created for STP Rural routes 102873~|~1~|~4~|~04/S>2~|~Plan Split 04 created for STP > 200000 routes 101205~|~1~|~1~|~01/IMS~|~Pavement plan split 1 created for all Interstate Routes: FRA-71-17.65-18.50/19.09-25.62 101205~|~1~|~2~|~02/IMS~|~CO CO Engr 01 pavement plan split 1 created for the follwing interstate routes: FRA-71-17.65-18.50/19.09-25.62 98801~|~1~|~1~|~01/MPO~|~80/20 federal split with local match for eligible resurfacing work items. 116810~|~1~|~1~|~01/S>2/AURO~|~Resurfacing, urban paving in the city of Aurora. 119596~|~1~|~1~|~01/NFP~|~Misc. Laboratory Testing 108722~|~1~|~1~|~01/STR~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-031 108722~|~1~|~2~|~02/STR~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-032 90589~|~1~|~1~|~01/SAF~|~Guardrail replacement project using CEAO funds. 100% Federal. 115102~|~1~|~1~|~01/S<2~|~Rock fall maintenance. 94353~|~1~|~1~|~01/NFP~|~ODNR funded project. Lake Hope State Park - Asphalt repairs/resurfacing; Zaleski State Forest - Culvert replacements and asphalt resurfacing; Waterloo Wildlife Area - Asphalt/aggregate resurfacing and guardrail. 100% state funded. 122389~|~1~|~1~|~01/MPO~|~Plan split for TLCI eligible work for pedestrian improvements and signal/crossing upgrades. 122389~|~1~|~3~|~03/NFP~|~Plan split for non-eligible work for the repair and resurfacing. 122389~|~1~|~2~|~02/ENH~|~Plan split for the STBG set-aside transportation alternatives eligible funded work. 93509~|~1~|~1~|~01/S>2~|~Project involves the installation of a traffic signal at Main Street (BUS-35) and Hospitality Drive to permit all turning movements. In addition, a stop controlled "T" intersection will be constructed at the US-35 Bypass ramp with Main Street. 101098~|~1~|~1~|~01/NHS~|~Replace superstructure on bridge COL-30-3407 (SFN 1502344). Project will also repair the substructure units and convert the abutments to semi-integral type. Vandal protection fencing will be maintained on the bridge. Project will also construct an access road to the inlet debris rack for structure COL-7-0595 (SFN 1500090). 118752~|~1~|~1~|~01/STR~|~added plan split. 115768~|~1~|~1~|~01/S>2~|~Sancus Blvd Upgrade 116840~|~1~|~1~|~01/NHS/MTVN~|~Construction costs associated with NHS segments 116840~|~1~|~2~|~02/S5K/MTVN~|~Construction costs along other federal aid highway routes 116943~|~1~|~1~|~01/STR~|~AC Overlay w/ Repairs HUR-303-0.00 to 3.72 116943~|~1~|~2~|~02/STR~|~Bridge Rehabilitation on SFN 3904083 HUR-303-1.93 83078~|~1~|~2~|~02/SAF~|~waterworks relocation to accommodate roadway work along East Miami River road as part of the ramp improvment project. 83078~|~1~|~1~|~01/SAE~|~On HAM-27 at 4.32 miles north of IR-275: add connection, from US-27 to East Miami River Road, on west side of US-27 that is similar to the connection on the east side. 97652~|~1~|~1~|~01/NFP~|~City of Independence will finance the construction of this interchange modification access as well as the improvement along Rockside Road to improve traffic flow in this area. 103589~|~1~|~1~|~01/NFA~|~Bridge Replacement. All work is in this split. 100% state funds from the District Preservation Program budget SAC 4PS7. Work on a minor collector that that is not on the federal aid system. The bridge at 0.10 meets the state definition of a bridge but not the federal definition. 117639~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 124067~|~1~|~1~|~01/NFA/FAI~|~Replacement of the existing structure (SFN 2334194) on Basil Rd in Fairfield County. 97377~|~1~|~1~|~01/STR~|~Prevailing wage Tree cutting contract 97377~|~2~|~2~|~02/STR~|~Bat Tree Removal along US 20 Corridor for PID 82632- 100%-4BD7 Funds 97377~|~2~|~3~|~03/NHS~|~Removal of Bat Trees along US 20 Corridor for PID 82632 4BD7 Funds. 101213~|~1~|~1~|~01/NFA~|~Non-federal aid eligible lane miles on SR 64 slm 10.85-11.37. 101213~|~1~|~2~|~02/STR~|~Resurfacing FUL 64 and SR 120 on STP Rural eligible portion. 101213~|~1~|~3~|~03/NFP~|~100% Village of Metamora funded items - Curb 124375~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation of federally eligible bridges on the interstate system. 96001~|~1~|~1~|~01/STR~|~District Preservation Bridge Funds - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on SFN 16000214 COS USR 36 05.88 115834~|~1~|~1~|~01/NFP~|~Pavement 105173~|~1~|~1~|~01/STR~|~Microsurfacing on rural route: SHE SR 274 SLM 10.73 to 15.24. 99499~|~1~|~1~|~01/SAE/Knox~|~"01/SAE/OT/KNOX" - Knox County Engineer approved CEAO funded project for the guardrail on various Cty Rds approved for max of $300,000. 111991~|~1~|~1~|~01/MPO~|~Reconstruction of Fishinger Road from Riverside Drive to Mountview Road 111991~|~1~|~2~|~02/S>2~|~100% Upper Arlington funded items 108200~|~1~|~1~|~01/MPO~|~Resurfacing of White Pond Drive. 122305~|~1~|~1~|~01/STR~|~912' rockfall hazard SR 218-5.55 mm 116838~|~1~|~1~|~01/ENH/WARR~|~Sidewalk replacements/repair. 85631~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 102968~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. 87745~|~1~|~1~|~01/NHS~|~Resurfacing 83338~|~1~|~3~|~03/NFP/Brya~|~In excess of the cap. 83338~|~1~|~2~|~02/NHS/Brya~|~A small City funded project to resurface and install a 2-way left turn lane on WIL-127-2.01 to 2.30. 83338~|~1~|~1~|~01/S<2~|~A small city funded project to resurface & widen WIL US127 2.01-2.3 124971~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP rural roadway 99914~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for pavement markings 85312~|~1~|~1~|~01/STR~|~Reconstruct Teeter Road (675') to intersect with the new alignment of Possum Run Road. 80/20 CEAO/Local Funds 117680~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds 107257~|~1~|~1~|~01/IMS~|~Slide Repair 87709~|~1~|~1~|~01/IMS~|~Resurfacing / Crack Seal 115030~|~1~|~2~|~02/NHS~|~MED US 0042 00.48-Culvert Replacement. 115030~|~1~|~1~|~01/STR~|~MED US 0042 12.87-Culvert Replacement. 121538~|~1~|~1~|~01/NHS~|~Signal upgrades/replacements. 122387~|~1~|~1~|~01/NFP~|~Metro Parks paving. 122387~|~1~|~2~|~02/NFP~|~Allardale Park parking lot. 108159~|~1~|~1~|~01/S>2~|~Replacing the wooden bridge decking with concrete, creating an ADA compliant ramp and improving the aesthetics of the bridge. 123382~|~1~|~1~|~01/NFP~|~Crack sealing 121341~|~1~|~1~|~01/S5K~|~added STP 87262~|~1~|~2~|~02/BRO~|~Concrete deck overlay & abut repairs (BR eligiible) DEL-37-22.13 over Prairie Run 87262~|~1~|~1~|~01/STR~|~Concrete deck overlay, parapet replacement, approach guardrail replacement (not BR eligiible)DEL-37-4.53, over Scioto River 119293~|~1~|~1~|~01/NFP~|~Created for J&C involvement 89029~|~1~|~1~|~01/IMS~|~Work replacing or reconstructing bridges. Work not eligible for federal BR funds. 89029~|~1~|~2~|~02/IMS~|~Work reconstructing the Interstate including the ramps. Does not include work replacing or reconstructing the bridges. The bridge work is in another split. 89029~|~1~|~3~|~03/ENH~|~Transporation Enhancement eligible activities. 98070~|~1~|~2~|~02/S<2/POW~|~Powell Urban Paving 80/20SLM 2.26 to 3.87 98070~|~1~|~1~|~01/STR~|~STP Rural 80/20SLM 0.00 to 2.26; 3.87 to 4.43 87185~|~1~|~1~|~01/NHS~|~Resurfacing a portion of US 35 in Greene County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. Also includes bridge sealing. 119153~|~1~|~2~|~02/STR~|~Rural plan split. 119153~|~1~|~1~|~01/IMS~|~Interstate plan split. 115191~|~1~|~1~|~01/S>2~|~Widen roadway from two to five lanes with a two way left turn lane. A new 5 foot wide sidewalk is proposed on the south side that will connect an existing shared use trail at Robert F. Mays Park to the intersection of Sheehan Rd. and Social Row Rd. There is an existing shared use trail on the north side that will remain or be incorporated into the project with minor improvements. 105932~|~1~|~1~|~01/MPO~|~complete streets treatments eligible for federal-aid 105932~|~1~|~2~|~02/CMQ~|~Work to construct Lorain Avenue Cycle Track from West 20th to West 65th Street that is eligible for CMAQ federal-aid 109454~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance. 109454~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance. 109454~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 113513~|~1~|~1~|~01/NHS~|~2" mill and fill with asphalt concrete in the City of Greenville:SR-49 SLM 16.36-16.68 113513~|~1~|~2~|~02/S<2~|~2" mill and fill with asphalt concrete in the City of Greenville:SR-49 SLM 15.18 to 15.50 82461~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 141 7.74-16.03. Rural other federal aid funded 80 federal/20 state. 82461~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 7 0.00-5.21. NHS route funded 80 federal/20 state. 107647~|~1~|~1~|~01/NHS~|~Signal Replacement. ATH 50 4.75. 86324~|~1~|~1~|~01/ENH~|~Sidewalks on both sides, handicap ramps, storm sewers, street lighting, and traffic signal installation fromon 600' North of Shull Rod to Gibson Road. 86324~|~1~|~2~|~02/MPO~|~Widen roadway to match the previous phases by adding thru lanes from 600' North of Shull Road to Gibson Road. 101133~|~1~|~1~|~01/STR~|~DSR# BEL-009 93870~|~1~|~2~|~02/NFA/LCEO~|~"02/NFA/OT/LCEO" - County Engineer's Association Highway Safety Improvement Funding 4HB7(100% Federal) - CAP = $300,000.00 Federal dollars total for Plan Split 1 & 2 - Installation of Guardrail on NOFAS Routes throughout the County; 1) Dayton Road (Lic-CR 260); 2) Northridge Road (Lic-CR 21); 3) Welsh Hill Road (CR 121); 4) Grandview Road (Lic-TR 143); 5) Canyon Road (Lic-TR 137); 6) Martinsburg Road (Lic-CR 204); 7) Christland Hills Road (Lic-CR 596); 8) Midland Oil Road (Lic-CR 5/CR 332); 93870~|~1~|~1~|~01/STR/LCEO~|~"01/STR/OT/LCEO" - County Engineer's Association Highway Safety Improvement Funding 4HB7(100% Federal) - CAP = $300,000.00 Federal dollars total for Plan Split 1 & 2 - Installation of Guardrail on Martisburg Road LIC CR204 13.40 to 13.43 103263~|~1~|~1~|~01/SAF~|~District wide pavement markers 103263~|~1~|~2~|~02/SAF~|~Polyester pavement markers on MIA-IR-75 SLM 4.92 to 10.84 - MOT-IR-70 SLM 17.32 to 12.55.This plan split is paid with Safety funds. 96698~|~1~|~1~|~01/NFA~|~Portage/Trumbull Full Service Facility 96698~|~1~|~2~|~02/NFP~|~Construct new Portage County Full Service Facility. 104758~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in ATB, MAH and TRU Counties. 114330~|~1~|~1~|~01/NFP~|~Split for tree maintenance 121403~|~1~|~1~|~01/S>2~|~W. North Broadway bridge Rehabilitation (SFN 2531496) 87704~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 121715~|~1~|~1~|~01/MPO/SUCE~|~Reconstruct pavement, includes bridge replacement 10' to 20' structure. 123283~|~1~|~1~|~01/IMS~|~Bridge repair project. Pile encasements. NOB 77 0.77 L (SFN 6100031) and R (SFN 6100066) and NOB 77 16.80 L (SFN 6100902) and R (SFN 6100937). 82265~|~1~|~2~|~02/IMS~|~Systematic Sign Replacement Program 82265~|~1~|~3~|~03/NHS~|~Systematic Sign Replacement NHS System 82265~|~1~|~1~|~01/S>2~|~Sign Replacement 123045~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance. 98920~|~1~|~1~|~01/NHS~|~Emergency bridge repair project. GAL 35 17.68, SFN 2701448. Type B Emergency. NHS route funded 100% state. 124340~|~1~|~1~|~01/S5K~|~All work included in this plan split. 95964~|~1~|~2~|~02/NFP~|~Salt building structural truss design deficiency repair. 95964~|~1~|~4~|~04/NFP~|~New 40' x 120' Pole Building with 6 bay cold storage at 4800 square feet. Demolish cold storage building. 95964~|~1~|~1~|~01/NFP~|~Close north end opening of salt building with concrete from the slab to top of existing walls. 95964~|~1~|~3~|~03/NFP~|~New 40' x 120' Pole Building with 6 bay cold storage at 4800 square feet. 109240~|~1~|~1~|~01/S<2~|~Replacement of RIC US 42 6.51 Liner installed at RIC US 42 06.74 93016~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing with related work on Mus-IR 70-05.73 to 10.66 95460~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Per-SR 93-00.00 to 12.57; 2) Per-SR 216-00.00 to 01.88; 3) Per-SR 595-00.00 to 02.10 114998~|~1~|~1~|~01/STR~|~Loop/Radar Detection. 102165~|~1~|~1~|~01/NFA~|~Fundling split to cover slope stabilizations, associated guardrail costs and any other costs not covered by other funding events. 105782~|~1~|~1~|~01/S5K~|~plan split for the small urban section of WAR-122 105782~|~1~|~2~|~02/STR~|~plan split for the rural sections 105782~|~1~|~3~|~03/NHS~|~plan split for the NHS segments of WAR-122 121531~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance. 110804~|~1~|~1~|~01/NFP~|~Crack seal and fog seal the Lock 14 and Deep Cut parking lots. 121877~|~1~|~1~|~01/STR~|~Slope Stabilization on CLE US 50 - rural section near SLM 7.1 97101~|~1~|~1~|~01/S>2~|~Type B Emergency to replace the longitudinal joint for HAM-127-1464 structure. 100590~|~1~|~1~|~01/STR~|~Resurfacing US-250, SR 9, SR 339 and SR 519. 124018~|~1~|~1~|~01/NFA~|~Pavement rehabilitation utilizing 100% State Oil & Shale (4SH7) funds up to CAP. 114969~|~1~|~1~|~01/STR~|~Resurfacing. 93586~|~1~|~1~|~01/ENH~|~Add pedestrian connections in City of Marietta through the Safe Routes to School Program, 100% Federal. 97000~|~1~|~1~|~01/BRF~|~Replacement of Vanderhoof Road structure (SFN# 7738099) over Tuscarawas River, Summit County, Ohio. 121814~|~1~|~1~|~01/NHS~|~Work on US 33 to construct new interchange. 121814~|~1~|~2~|~02/S>2~|~Work on TR 229 to construct interchange 88851~|~1~|~1~|~01/NFA~|~District Preservation funds (100% state) - Resurfacing on SR709 from Carmeen Street to SR116. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds. 117635~|~1~|~1~|~01/SAF~|~Install signal at SR 435/SR 729 intersection 111253~|~1~|~1~|~01/MPO~|~MPO funded plans split 102910~|~1~|~1~|~01/STR~|~Mill and fill on CR 330 102910~|~1~|~2~|~02/S<2~|~Urban areas of project from SLMs 10.20-10.22 and 19.08 to 20.01 122351~|~1~|~1~|~01/SAF~|~Extend sidewalk on Bellbrook Place, install high visibility crosswalks and ramps at Bellbrook Place/SR-161 and install RRFB with crosswalk lighting on SR-161. 117503~|~1~|~1~|~01/BRF/PCEO~|~Superstructure replacement on bridges PRE-TR 462-1.70 (SFN 6837387) and PRE-CR 9-4.69 (SFN 6830528). 119023~|~1~|~1~|~01/NFP~|~districtwide crack sealing project. 100751~|~1~|~1~|~01/NFP~|~Split for resurfacing work on US-322 104780~|~1~|~1~|~01/MPO/HEBR~|~LCATS/Village of Hebron Culvert Funding = 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of culvert CFN 1839857 at SLM 14.998. 104780~|~2~|~2~|~02/ENH/HEBR~|~Village of Hebron approved TA funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - For Sidewalks and ADA Requirements as part of US 40 Culvert Replacement project. 116415~|~1~|~1~|~01/NHS~|~RCUT Intersection Improvement. 116415~|~1~|~2~|~02/NHS~|~RCUT Intersection Improvement. 101039~|~1~|~1~|~01/S<2~|~ATB SR 534 from 22.61 to 25.26. 101039~|~1~|~2~|~02/STR~|~ATB SR 45 from 19.75 to 22.28. 109786~|~1~|~1~|~01/NHS~|~AC overlay without repairs 90666~|~1~|~1~|~01/MPO~|~WOO SR795 1.23-1.24 Intersection Improvement 123736~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m. 91175~|~1~|~1~|~01/ENH~|~Project involves enhancement of the intersection of Grange Hall Road (CR-25) and Pentagon Blvd. by landscaping with shade trees, evergreens, shrubs, and perennial flowers along the northeast and southeast corners of the intersection. Project involves some minor grading work and installation of decorative retaining walls to provide suitable planting beds. 114625~|~1~|~1~|~01/STR~|~Bridge replacement 106103~|~1~|~1~|~01/SAE~|~Plan Split 124275~|~1~|~1~|~01/ENH~|~Shared use path repairs utilizing 100% Federal funds (80% TAP-4B37 matched with 20% Toll Revenue Credit) up to federal maximum. 118651~|~1~|~2~|~02/NHS~|~Plan split for OTT-2 & WOO-795 118651~|~1~|~1~|~01/IMS~|~Pavement markings on WOO-75 & LUC-75 118651~|~1~|~3~|~03/S5K~|~Plan split for WOO-25 from SLM 6.285 to 8.415 118651~|~1~|~4~|~04/STR~|~Plan split for WOO-25 from SLM 0.516 to 6.285 123419~|~1~|~1~|~01/STR~|~Resurfacing SR 213 116096~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 116096~|~1~|~2~|~02/SAE~|~High friction surface treatment (resurfacing) on the following ramps. I-77SB to US 62EB and US 62WB to I-77SB. 100386~|~1~|~1~|~01/NFA~|~SFN 8744300 96642~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. HOC 180 7.35-16.51 and HOC 374 6.11-12.65. Rural other federal aid funded 80 federal/20 state. 106115~|~1~|~1~|~01/NFP~|~Lighting 110871~|~1~|~1~|~01/NHS~|~Painting of bridges on US 30 in Van Wert County which is on the NHS. District Preservation Program funds. 105221~|~1~|~1~|~01/S>2~|~Replace the concrete overlays of 2 bridges on Lg Urban route. 99431~|~1~|~1~|~01/NFP~|~Guardrail repair and maintenance on various routes throughout District 4. 109153~|~1~|~1~|~01/NFA~|~Upgrading sidewalks within the Warren City School District. 108166~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH 144 4.92-4.94. DSR ATH-007. Funded 100% federal. 116852~|~1~|~1~|~01/CMQ/MACE~|~Road diet along Glenwood Ave. 95081~|~1~|~3~|~03/STR~|~Repair or replace culvert MER US 127 23.02 95081~|~1~|~1~|~01/STR~|~Repair or replace culvert MER SR 49-18.53 95081~|~1~|~2~|~02/STR~|~Repair or replace culvert MER SR 117 0.16 93314~|~1~|~1~|~01/S<2~|~Marysville urban pavingUNI-4: 13.08-14.06UNI-31: 0-1.77 100881~|~1~|~1~|~01/S<2~|~LOR 90 Noise Wall Replacement 83097~|~1~|~1~|~01/MPO~|~Mill and fill 83097~|~1~|~2~|~02/MPO~|~100% local items. 108327~|~1~|~1~|~01/NFA~|~OH18-01 ER Event. Landslide repair project on MRG 376 11.00. MRG_NF_0001. Not on any federal aid system funded 100% ER funds. 99861~|~1~|~2~|~02/NHS~|~Remove existing sub-structure (LOG-33-064L) 99861~|~1~|~1~|~01/NHS~|~Replace deck and investigate semi integral abutment conversion; investigate raising deck due to debris and overtopping. 80958~|~1~|~1~|~01/ERD~|~Earmark funds 92978~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Mus-SR 208-11.06 to 11.19 92978~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 93-12.85 to 13.92 92978~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Mus-SR 93-13.92 to 30.97; 2) Cos-SR 93-00.00 to 03.50; 3) Mus-SR 93-31.28 to 34.58; 92978~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on NHS portion of Mus-SR 93-12.78 to 12.85 119931~|~1~|~1~|~01/SAF~|~All work included in this split. 99531~|~1~|~1~|~01/IMS~|~Resurfacing work on the interstate using IM funds at 90/10 fed/state. 120124~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 101185~|~1~|~1~|~01/STR~|~Added Plan Split 1, STP Rural, includes DEL 257 0.00-7.80, 8.37-14.26 and DEL 750 4.43-7.26. 92116~|~1~|~1~|~01/S<2~|~Plans split for Urban area near Bryan: Wil-2-7.54 to 9.78 92116~|~1~|~2~|~02/STR~|~Plans split for rural area: Wil-2-9.78 to 13.25 105582~|~1~|~1~|~01/NHS~|~NHS General System Split DEL-3, various locations on DEL-23, FRA-3 & FRA-62 105582~|~1~|~2~|~02/S>2~|~Columbus Urban Area Split: DEL-37-23.08-23.17 DEL-61-0.43-2.72 DEL-203-0.00-0.01 DEL-23-7.26-7.43 & 7.64-7.87 FRA-315-12.79-12.91 FRA-605-1.71-1.87 105582~|~1~|~3~|~03/STR~|~Rural Plan Split: DEL-37-23.17-29.08 DEL-61-2.72-7.84 DEL-203-0.01-0.06 105582~|~1~|~4~|~04/NHS~|~Priority NHS Plan Split: Various locations on DEL-23 DEL-36-12.45-12.70 & 12.81-12.83 FRA-104-10.51-12.98 105582~|~1~|~5~|~05/S<2~|~City of Delaware Plan Split: DEL-36-11.29-12.45 & 12.70-12.81 105582~|~1~|~6~|~06/S>2~|~City of Columbus Plan Split: FRA-315-12.45-12.79 82032~|~1~|~1~|~01/STR~|~Resurfacing WAY-003-26.13 - 28.35 / MED-003-0.00 - 3.80 82032~|~2~|~2~|~02/BRO~|~BR Funded Bridge Replacement - MED-003-0221 sfn:5200024 95377~|~1~|~1~|~01/NFP~|~Waterline work to be performed by Mercer County Engineer for ODOT facility. Reimbursement will be made to County as work performed. 92748~|~1~|~1~|~01/BRO~|~8706905 WOO SR579 1.84 Intersect: Cedar Creek 123012~|~1~|~1~|~01/NHS~|~Districtwide signal installation and repairs. 119346~|~1~|~1~|~01/NHS~|~Deck replacement. 111359~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads in Hocking HIlls State Park. Funded 100% State. 123251~|~1~|~1~|~01/S5K~|~Culvert repair. 105184~|~1~|~1~|~01/MPO~|~Construction of a shared use path along Kemper Road from US-42 to the Sharon Woods Park - Lakeview Lodge driveway. 112776~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 112776~|~1~|~1~|~01/IMS~|~Resurfacing. 93830~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: Located on SR247, 0.04 mile norht of the Adams County line. Project Description: It is proposed to replace the structure, SFN 3603482 80/20 split01/STR/BR/State 114366~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " 93252~|~1~|~1~|~01/IMS~|~Overlay bridge deck, patch piers, retrofit parapet and rail, restore expansion with semi-integral abutment conversion with new approach slabs, paint and seal structures on SFN 7502192 SHE 1108 TR 15 (Sharp Road) over IR 75. 101666~|~1~|~1~|~01/IMS~|~Crack sealing on DEL-71-1.60 to 11.55; FRA-270-48.47 to 52.16 101666~|~1~|~2~|~02/NHS~|~Crack sealing on FRA-161-13.97 to 14.01; FRA-161-14.31 to 14.85; FRA040-6.96 to 7.60 101666~|~1~|~3~|~03/STR~|~Crack sealing on DEL-37-23.30 to 29.08; DEL-4-0.00 to 1.98; DEL-42-13.27 to 19.17; FAY-22-10.98 to 17.62; FRA-665-0.00 to 3.31; FRA-665-5.18 to 7.39; UNI-4-24.28 to 26.25 101666~|~1~|~4~|~04/S>2~|~Cracking sealing on DEL-42-12.37 to 13.27; FRA-161-0.00 to 0.83; FRA-40-4.43 to 4.69; FRA-665-7.39 to 8.34 101666~|~1~|~6~|~06/NFA~|~Crack sealing the Ohio Air National Guard and US Naval Reserve parking lots. To be paid by ISTV 101666~|~1~|~5~|~05/S<2~|~Crack sealing on FAY-22-10.33 to 10.98; FRA-62-1.34 to 1.64; FRA-665-3.31 to 5.18 99647~|~1~|~1~|~01/STR~|~Replacement/rehabilitation of multiple culverts in the District 101351~|~1~|~1~|~01/STR~|~Microsurfacing on the following sections: FAY-38-5.47-13.38 FAY-238-0.00-1.04 101351~|~1~|~3~|~03/S<2~|~Resurfacing on the following sections: FAY-41-10.34-10.64, 13.04-15.48 101351~|~1~|~2~|~02/STR~|~Resurfacing on the following sections: FAY-41-0.00-10.34, 15.48-29.05; UNI-161-0.63-6.12 101351~|~1~|~4~|~04/S>2~|~Resurfacing FRA-315-11.82 to 12.14 94176~|~1~|~1~|~01/BRO~|~Replace culvert carrying SR 170 over Branch of North Fork Little Beaver Creek. 88917~|~1~|~1~|~01/BRO~|~Replace existing twin CMP pipes (COL-164-1414, SFN 1504029) in kind or with a four-sided concrete box. 108241~|~1~|~1~|~01/NFA~|~ODNR slip project in Tar Hollow State Park. 100502~|~1~|~3~|~03/STR~|~Bridge plan split placeholder. 100502~|~1~|~1~|~01/S<2~|~HIG 50 (14.98-15.56) 100502~|~1~|~2~|~02/STR~|~HIG 50 (15.56-18.23) 100502~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 123711~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance 99063~|~1~|~1~|~01/STR~|~Apply Herbicides along roadside for week control on 2 lane highways - AUG/LOG/CHP/CLA 98467~|~1~|~1~|~01/STR~|~All work outside of the City of Delphos. This includes all work on US 224 and all work on SR 114. District Presevation Program funds. Federal funds are rural STP. 116479~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing. 109136~|~1~|~1~|~01/SAF~|~Construct sidewalks along Kingsford Rd between Eakin Rd and Briggs Rd 121413~|~1~|~1~|~01/SAF~|~Federal items. 107292~|~1~|~1~|~01/CMQ~|~Improvements to the existing intersections of US-50 with SR-132 in the Village of Owensville. 107292~|~2~|~2~|~02/CMQ~|~100% local match for water line replacement 107292~|~1~|~3~|~03/SAF~|~Pedestrian safety improvements including sidewalk, ADA compliant curb ramps, high visibility crosswalks, and traffic signals. 109130~|~1~|~1~|~01/STR~|~Test 93370~|~1~|~1~|~01/NHS~|~Priority system paving of FRA-315: 2.37-5.18 93370~|~1~|~2~|~02/IMS~|~Priority system paving of FRA-71: 18.34-19.09 111006~|~1~|~1~|~01/SAF~|~Split 1 for work at Mayfield Road 114100~|~1~|~1~|~01/S>2~|~Danube Court bridge rehab: Replacement of the superstructure with prestressed concrete box beams with a composite concrete deck (this will be re-evaluated to avoid hydraulic impacts). Also, minor substructure modifications/repairs, as well as related roadway and storm sewer adjustments and restoration. 107483~|~1~|~1~|~01/CMQ~|~Plan Split 107795~|~1~|~1~|~01/MPO~|~Resurfacing of CR 50 from 2.03 to 2.85 in the cities of New Franklin and Green. 96196~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 112331~|~1~|~1~|~01/NFP~|~Bridge Operation Plans split 86840~|~1~|~1~|~01/NHS~|~District Allocation 86840~|~1~|~5~|~05/NHS~|~Bridge Work 86840~|~1~|~3~|~03/NHS/RITT~|~AMATS / City of Rittman Pavement Repair 86840~|~1~|~4~|~04/NHS/RITT~|~100% City of Rittman Items 86840~|~1~|~2~|~02/NHS~|~Urban Paving - 80/20 - District Allocation/City of Rittman 107179~|~1~|~1~|~01/STR~|~ROS SR 207 13.55 Culvert Replacement 93362~|~1~|~1~|~01/NFP~|~From Galbraith Road north to Sharon Road along IR75 Demolition of buildings acquired and to be left vacant until main construction phase of thru the valley. Buildings are being acquired under HAM-75-12.60 PID82288. There are approximately 39 buildings under pid82288. 108375~|~1~|~1~|~01/MPO~|~Resurfacing of S Van Buren Ave and W Waterloo Rd within the City of Barberton. 96440~|~1~|~1~|~01/BRO~|~Replace existing box beam bridge (JEF-164-0525, SFN 4103033) with new structure. 96440~|~1~|~2~|~02/BRO~|~Plan split no 2, for Railroad construction costs. 96064~|~1~|~1~|~01/NFP/SUMM~|~Resurfacing of parking lots and driveways in Cascade Valley MetroPark, Silver Creek MetroPark, and Munroe Falls Metro Park, in Summit County, Ohio. 95584~|~1~|~2~|~02/S<2~|~HIG SR 28 15.35-15.43HIG SR 138 32.48-32.79HIG SR 753 17.49-18.03 95584~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 95584~|~1~|~1~|~01/STR~|~HIG SR 28 7.27-15.35HIG SR 753 13.10-17.49 121351~|~1~|~1~|~01/IMS~|~Plan split for approach slab work associated with bridge LUC-475-0254 121351~|~1~|~2~|~02/NHS~|~Plan split for resurfacing work 102014~|~1~|~1~|~01/IMS~|~Landslide repair projet. NOB IR 77 2.81-3.13. 90% Federal and 10% State funds. 81081~|~1~|~1~|~01/STR~|~General system resurfacing in rural func classMAD-142: 11.45-13.34 plus area between I-70 rampsMAD-665: 3.28-11.1201/STR/PV/ 81081~|~1~|~6~|~06/STR~|~80/20 bridge work (not BR eligilbe):SFN 4903676, MAD-142-12.69, over Silver DitchSFN 4904354, MAD-665-5.53, over Glad RunSFN 4904397, MAD-665-6.33, over Morehead Run06/STR/BR/ 81081~|~1~|~4~|~04/IMS~|~Bridge work over I-70 (not BR eligible):SFN 4902793, MAD-142-13.41L, over I-70SFN 4902823 MAD-142-13.41R, over I-7004/IMS/BR/ 81081~|~1~|~3~|~03/S<2~|~General system paving in urban func class areaMAD-665: 1.17-3.2803/S<2/PV/F_ST 81081~|~1~|~5~|~05/S<2~|~80/20 bridge work (not BR eligible):SFN 4904257, MAD-665-2.58, over Payne Ditch05/S<2/BR/ 81081~|~1~|~2~|~02/S<2~|~Urban paving in London in urban func class areaMAD-665: 0.32-1.1702/S<2/PV/F_LC 88692~|~1~|~1~|~01/STR~|~Berm stabilization and resurfacing of the existing roadway with asphalt concrete on State Route 119 from SLM 4.41 East of State Route 29 to West Corporation Limit of the Village of Anna (SLM 7.76) 122830~|~1~|~1~|~01/MPO~|~Township of West Chester EV projects 2026 90654~|~1~|~1~|~01/NHS~|~culvert at SAN SR53 14.73-14.74 99737~|~1~|~1~|~01/IMS~|~New interchange at 474/Dorr St 99737~|~1~|~2~|~02/NFA~|~Build a new interchange in Lucas County on IR-475 at Dorr St 93533~|~1~|~1~|~01/SAE~|~HAWK Signal on Plainville Road at mid-block crossing in front of school entrance; New School signing on streets surrounding school; and bike racks at the school. 96977~|~1~|~1~|~01/IMS~|~Herbicidal Spraying on various routes in District 4. 112788~|~1~|~1~|~01/ENH~|~Installing new sidewalk on western side of Cleveland-Massillon Rd from SR 18 to Springside Dr. 103837~|~1~|~1~|~01/NFA~|~The Village will widen and improve 1,275 feet of TR 98 and widen the access of Arrowhead Drive which leads into Arrowhead Commerce Park off of SR 199 90981~|~1~|~1~|~01/SAE~|~100% Safe Routes to School funding for various sidewalks, ped crossings with Village of Plain City 99729~|~1~|~1~|~01/ENH/GREE~|~Constructing new sidewalks along Raber Road between Troon Drive and Mayfair Road. 98659~|~1~|~1~|~01/IMS~|~Plan split for interstate striping 98659~|~1~|~2~|~02/NHS~|~Split for work on the NHS 98659~|~1~|~3~|~03/S>2~|~Split for work on the urban STP routes 98659~|~1~|~4~|~04/STR~|~Split for work on the rural STP routes 121167~|~1~|~1~|~01/STR~|~All Work is in this split 87260~|~1~|~5~|~05/S<2/Chil~|~In the urban paving area LSM 24.13 - 25.12 & 25.21 - 25.25, the city is responsible 100% for full depth repair and joint replacement also including median repair.100% local match 87260~|~1~|~2~|~02/S<2~|~ROS-US-50 24.130 to 27.290 Resurfacing ProjectUrban Paving Sections 24.13 - 25.12 & 25.21 - 25.25On US50, begin @ it's intersection with SR159, head E on Bridge St, turn SE onto Eastern Ave. and terminate @ US35. 3.16 miles Loop detectors are part of this portion. 80% Fed/20% local match 87260~|~1~|~3~|~03/STR~|~ROS US50 24.13 Brdg/Eastern Brdg Rehab on 7102224 ROS US50 27.14 Intersect: Us Route 3580/20 Split 87260~|~1~|~4~|~04/S<2~|~ROS-US-50 24.130 to 27.290 Resurfacing ProjectUrban Area Section 25.12 - 25.21 & 25.25 - 26.7580/20 split 87260~|~1~|~6~|~06/NHS~|~Ramp F on US35 87260~|~1~|~1~|~01/STR~|~ROS-US-50 24.130 to 27.290 Resurfacing ProjectRural Section 26.75 - 27.29On US50, begin @ it's intersection with SR159, head E on Bridge St, turn SE onto Eastern Ave. and terminate @ US35. 3.16 miles This includes the single lane of Ramp H and the two lanes of the west section. 80/20 Split 87260~|~1~|~7~|~07/SAE/CHI~|~The section of US50 where this portion of the project is location is within the limits of the city of Chillicothe. Of the three intersections only two of them currently have pedestrian equipment, one with two sets of ped heads to cross US50 and the other with one. The intersection at Eastern Avenue does not have any pedestrian equipment at all so in a way it?s a replacement as well as an upgrade. The safety component on 5th street and 7th street relates to the location of an elementary school in on the east side of US50 between 5th and 7th and the installation of loop detection at the side streets. Access to the elementary school is by way of 5th street approximately 150 feet east of the intersection with US50. During school hours children cross US 50 at these intersections to reach the facility. Currently, the signals on this section are pre-timed and pedestrians will get a green on the side street on a regular interval. Once loop detection is installed and the signals are actuated pedestrians will wait until a vehicle happens to be on the side street as well. Pedestrian push buttons and signals will help to reduce the tendency of pedestrians becoming impatient and crossing without the signal. 107536~|~1~|~2~|~02/S<2~|~Resurfacing US 36 107536~|~1~|~1~|~01/NHS~|~Resurfacing TUS-250 76764~|~1~|~1~|~01/IMS~|~Major rehabilitation and widening along IR 70 107980~|~1~|~1~|~01/S>2~|~Urban Paving resurfacing 107980~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. 95750~|~1~|~1~|~01/STR~|~LUC-64 from SLM 6.36 to SLM 8.91 95750~|~1~|~2~|~02/NHS~|~Seal deck US24 bridge SFN 4802489 95750~|~1~|~3~|~03/S>2~|~SR-64 from SLM 2.68 to 3.61 and then from SLM 3.93 to 6.36 95367~|~1~|~1~|~01/NFP~|~Removal of sfn#5000785, MAH-SR11-15.34, Austintown Township, Mahoning County, Ohio. 122295~|~1~|~1~|~01/NHS~|~Plan split for replacement of the bridge deck and miscellaneous repair items 95457~|~1~|~2~|~02/S<2~|~District Preservation Pavement Funds - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Gue-USR 22-02.31 to 06.04; 2) Gue-USR 22-6.19 to 6.98; 3) Gue-SR 723-0.07 to 0.85 95457~|~1~|~3~|~03/S<2/CAMB~|~District Preservation Urban Paving 4PF7 (80%Federal)/4BG7 (20% Local Match) - No CAP - resurfacing on Gue-USR 22 -06.04 to 06.19 and Gue-USR 22-06.98 to 07.36 95457~|~1~|~5~|~05/S<2~|~District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of traffic signal at US 22/SR 723 intersection. 95457~|~1~|~4~|~04/S<2/CAMB~|~City of Cambridge Local Funding - 4BG7 (100% Local) - No CAP - For Curb Ramp at Dewey Ave. 95457~|~1~|~1~|~01/STR~|~District Preservation Pavement Funds - 7BPB (100% Bond) or 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comment - Resurfacing on 1) Gue-USR 22-00.00 to 02.31; 2)Mus-US 22-27.64 to 27.73 121575~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 104841~|~1~|~1~|~01/IMS~|~Lighting Maintenance 104841~|~1~|~2~|~02/NHS~|~Replacement of Wooden Pole and the ground mounted control center. 104841~|~1~|~3~|~03/S<2~|~Installation of Base and electric meter for the stop light at RIC- SR- 0314 and West Forth Street. 98678~|~1~|~1~|~01/SAF~|~Place, Replace & Reconstruct guardrail with associated activities on various Mercer county roadways. 97650~|~1~|~1~|~01/BRF~|~SFN 3560023 114544~|~1~|~1~|~01/IMS~|~FRA-270 resurfacing items and all other miscellaneous work 117460~|~1~|~1~|~01/ENH~|~Rectangular Rapid Flashing Beacons and Lighting along Long St/Ashville Pike 109838~|~1~|~1~|~01/NHS~|~JAC 32 0.00-6.4 109838~|~1~|~2~|~02/SAE~|~Recessed-Wet Reflective Pavement Markings. 109838~|~1~|~3~|~03/NFP~|~Retro fuel price adjustment 112734~|~1~|~1~|~01/STR~|~Overlay and abutment repair to MRW-19-2.57 and MRW-61-25.13 113195~|~1~|~1~|~01/NFP~|~2021 OPERATIONS CHIP SEAL - SUMMER 2020 116039~|~1~|~1~|~01/STR~|~Work on SR 18 in Defiance County outside of the Defiance Urban Area. 116039~|~1~|~2~|~02/S5K~|~Work on SR 18 in Defiance County inside the Defiance Urban Area but outside of the Defiance Urban Area. No local funds. 91419~|~1~|~1~|~01/IMS~|~plan split for roadway/pavement work:HAM-74: SLM 3.54 to 7.05HAM-275: SLM 3.97-7.61 91419~|~1~|~3~|~03/SAF~|~Increased friction surface course on Ramps E and F 91419~|~1~|~2~|~02/IMS~|~This funding split is for all bridge work including expansion joint/backwall repairs. 121830~|~1~|~1~|~01/MPO~|~installation of EV Charging Station at Anderson Center 94472~|~1~|~1~|~01/STR~|~Various routes district wide. 93369~|~1~|~1~|~01/ERD/Port~|~Phase 2 of the Ferry Terminal Building in Port Clinton. 109321~|~1~|~1~|~01/S<2/NEWA~|~Replacement of SFN 4560078, Lic-CR 804-01.73 carrying Church Street over Raccoon Creek in the City of Newark. 8941~|~1~|~1~|~01/NHS~|~7401418 SEN US23 4.88 Intersect: Wolf Creek Branch 104014~|~1~|~1~|~01/SAE~|~Installation of Raised Pavement Markers (RPMs) on various county roads in Preble County. 97778~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 2.99. Type A emergency project. Funded 100% state. 109904~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 513 11.08. Rural other federal aid funded 100% Federal ER. 102963~|~1~|~1~|~01/STR~|~Chip seal on rural routes: SHE SR 66 SLM 0.00 to 6.42 102963~|~1~|~2~|~02/NFA~|~Chip seal on Non-Federal Aid Route: MIA SR 55 SLM 0.00 to 2.90 110459~|~1~|~1~|~01/SAE~|~Improve the horizontal alignment on eastbound SR-122 at the intersection of Breiel Boulevard while also providing an eastbound right turn lane. Install distance plaque on existing mast arm west of the intersection. Evaluate signal timing to determine if providing protected-only left turn movements is feasible. 110459~|~1~|~2~|~02/NHS~|~Plan Split for the retroactive change order for fuel price adjustment. 89477~|~1~|~1~|~01/S<2/GRAN~|~"01/S<2/PV/GRAN" - CAP $779,990.00 LCATS - 4TA7 (80% Federal) / 4BG7 (20% Local) - Resurfacing of CR539 within the Village of Granville utilizing LCATS funding. 104659~|~1~|~1~|~01/MPO~|~Resurfacing Fifth Ave from Federal Street to US 422 in the City of Youngstown. 104659~|~1~|~2~|~02/ENH~|~Sidewalk and Lighting enhancements along 5th Ave in the City of Youngstown. 100339~|~1~|~1~|~01/NHS~|~LUC-SR2-2.23 to 2.66 LUC-SR2-3.38 to 4.50 100339~|~1~|~2~|~02/S>2~|~US-20A from SLM 0.30 to 2.23 124669~|~1~|~1~|~01/STR~|~All work included in this plan split. 104895~|~1~|~1~|~01/STR~|~Culvert Liner project on GAL 218 6.47. Rural other federal aid funded 80 federal/20 state. 91763~|~1~|~1~|~01/STR~|~Rehabilitate Bridge Size Culvert CLE-133-1243 (sfn 1303309) by lining with a sprayed-in-place liner. 100213~|~1~|~1~|~01/S>2~|~Widen Stringtown Rd 113769~|~1~|~1~|~01/SAF~|~Convert US23/Hull Drive intersection to left-in/right-out 113769~|~1~|~2~|~02/NHS~|~Addition of northbound right-turn lane (100% local). 109341~|~1~|~1~|~01/STR~|~GAP project in FY2019 to resurface a section of US 127 in Preble County from the Village of West Manchester to the Darke County line. 124082~|~1~|~1~|~01/MPO/STPK~|~Resurfacing. 113125~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment 120120~|~1~|~1~|~01/NFA~|~Created for TID involvement 97308~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation. 96881~|~1~|~1~|~01/NFP~|~Pavement repair and resurfacing 107706~|~1~|~1~|~01/STR~|~Resurfacing on SR 115 and SR 613 using district preservation funds (80% 4PF7 and 20% 4PS7). 119740~|~1~|~1~|~01/NFA~|~Creating Plan Split for TED Involvement 108276~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 144 5.15-5.19. 80% Federal ER and 20% State ER funded. 97764~|~1~|~1~|~01/STR~|~SFN 550096, MIA-48-0760 over Stillwater River remove LMC overlay and replace with SDC overlay using hydrodemolition. Refurbish abutment bearings, patch abutments & piers, replace expansion joints, paint ends of beams including end frames and bearings. Seal concrete surfaces.SFN 5501563, MIA-55-15.32 - encase piers 109957~|~1~|~1~|~01/SAF~|~CLI CR 16 7.65-8.75 realign both the horizontal and vertical curve as well as widen pavement and berms. 110454~|~1~|~1~|~01/NHS~|~Resurfacing US 22 112575~|~1~|~1~|~01/BRO~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work. 98600~|~1~|~2~|~02/BRO~|~Split for work on SR-44 over Kellogg Creek 98600~|~1~|~1~|~01/IMS~|~Plan split for work on Morley and Ford over IR-90 and SR-17 over IR-480. 112646~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 92965~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge replacement 107815~|~1~|~1~|~01/S<2~|~Landslide repair. 100403~|~1~|~1~|~01/STR~|~Structure replacement project. GAL 141 4.52, SFN 2701545. Rural other federal aid funded 80 federal/20 state. 100403~|~1~|~2~|~02/NFA~|~Bridge replacement project. GAL 790 3.76 (SFN 2704840). Not on any federal aid system funded 100% state. 97571~|~1~|~1~|~01/STR~|~Resurfacing of CAR-43 and CAR-164 including pavement repairs and pavement markings. 116061~|~1~|~2~|~02/STR~|~Resurfacing 116061~|~1~|~1~|~01/S5K~|~Resurface with fine graded polymer modified asphalt concrete. 96369~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - District Preservation 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge replacement on 4502310 LIC-40-19.64 Intersect: Over Spring Run; Not BR Eligible: Length=10 SD/FO(0) SR=95.7 98011~|~1~|~1~|~01/STR~|~Resurfacing and preventative maintenance work in rural segments. 98011~|~1~|~2~|~02/S>2~|~Resurfacing and work in rural >200K segments. 88920~|~1~|~1~|~01/BRO~|~Replace existing three cell concrete structure (JEF-213-0467, SFN 4103122) with a new steel beam or prestressed concrete I-beam single span structure. 117731~|~1~|~1~|~01/NFP~|~Resurface French Creek Picnic Area. 100788~|~1~|~1~|~01/STR~|~HEN-108 and HEN-109 100788~|~1~|~2~|~02/STR~|~SFN 3503186 107235~|~1~|~1~|~01/CMQ~|~Signal upgrade along various routes within the City of Warren. 107235~|~1~|~2~|~02/SAF~|~Replacing 12 school zone 20 MPH flasher units, replace 74 pedestrian signals, install pedestrian signals at 3 signalized locations and 1 HAWK signal and install high visibility thermoplastic crosswalk markings where needed. 122093~|~1~|~1~|~01/NFA/CROO~|~Industrial Drive sidewalk improvement project in the Village of Crooksville / Perry County. 102413~|~1~|~1~|~01/NHS~|~STA SR 153 from 7.47 to 7.80 102413~|~1~|~2~|~02/S>2~|~STA SR 153 from 7.80 to 8.06 STA SR 172 from 19.51 to 20.36 102413~|~1~|~3~|~03/STR~|~STA SR 153 from 8.06 to 9.87 STA SR 172 from 20.36 to 25.53 112488~|~1~|~1~|~01/NHS~|~Resurfacing 112488~|~1~|~2~|~02/S5K~|~Resurface with asphalt concrete 112488~|~1~|~3~|~03/STR~|~Resurface with asphalt concrete 106964~|~1~|~1~|~01/NFA~|~Create an overflow parking lot using grass stone pavers. 116441~|~1~|~1~|~01/NFP~|~Installing Recessed Wet Reflective pavement markings on various routes throughout District 4. 94624~|~1~|~1~|~01/NFP~|~Auxilary pavement markings in Portage, Stark, and Summit Counties, Ohio. 123131~|~1~|~1~|~01/IMS~|~Landscape maintenance along Interstate 106309~|~1~|~1~|~01/NHS~|~Urban Paving 101690~|~1~|~1~|~01/ENH/SOME~|~"01/ENH/OT/SOME" Village of Somerset TA approved project for sidewalks. Maximum TA funds approved at 95% = $682,240 93673~|~1~|~1~|~01/STR~|~District Wide RPMs 103673~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 13.82. DSR MEG-003. 93000~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with associated work on Per-SR 668-11.00 to 16.88 93000~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing and associated repairs on: 1) Lic-SR 668-00.00 to 02.73; 2) Per-SR 668-17.64 to 26.35; 105528~|~1~|~1~|~01/STR~|~All work on SR 637 in Paulding County. Work on SR 18 in Defiance County from SR 2 in Hicksville at 3.52 to the Defiance Urban Area boundary at TR 149 (Ashpacher Road) at 21.22. All funds from the District Preservation Program budget. No local funds. 105528~|~1~|~2~|~02/S<2~|~Work on SR 18 in Defiance County from the Defiance Urban Area boundary at TR 149 (Ashpacher Road) at 21.22 to SR 15 at 22.30. All funds are from the District Preservation Program budget. No local funds. Although the work is inside the Defiance Urban Area, it is outside of the City of Defiance. 107755~|~1~|~1~|~01/S5K~|~Work on signals inside the Findlay Urban Area and inside the Defiance Urban Area. 100% federal funds provided by the District. No local funds. 107755~|~1~|~2~|~02/S50~|~Work on a signal inside the Lima Urbanized Area. 100% federal funds provided by the District. No local funds. 111235~|~1~|~1~|~01/BRF~|~Bridge Replacement 102548~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on: Ham 125 SLM 4.04 to 7.52 124133~|~1~|~1~|~01/SAE~|~100% safety funded as part of target speed pilot program 123701~|~1~|~1~|~01/IMS~|~Widening of Dry Fork Road to provide a right turn lane from NB to the EB I-74 on ramp. Also widening the EB I-74 exit ramp to provide a right turn lane to SB Dry Fork Road. 102356~|~1~|~3~|~03/STR~|~Microsurfacing to ATB SR 45 from 24.60 to 26.43, ATB SR 167 from 0.00 to 2.17, ATB SR 193 from 22.54 to 24.12. 102356~|~1~|~1~|~01/NHS~|~Double Microsurfacing to ATB US 20 from 3.87 to 6.35. Microsurfacing to ATB US 20 from 14.78 to 21.60. 102356~|~1~|~2~|~02/S<2~|~Microsurfacing to ATB SR 45 from 24.11 to 24.60 and 26.43 to 26.45, ATB SR 84 from 19.75 to 20.28, ATB SR 193 from 27.28 to 27.71. 119170~|~1~|~1~|~01/IMS~|~Two-lane resurfacing project using an asphalt overlay treatment. NOB 77 11.22-18.92. 123786~|~1~|~1~|~01/NHS~|~NHS 123786~|~1~|~2~|~02/NHS~|~bridge plan split. 98476~|~1~|~1~|~01/STR~|~Funds from the District Preservation Program. 80% Federal rural STP funds SAC 4PF7 and 20% state funds SAC 4PS7. 82370~|~1~|~1~|~01/NHS~|~Improve capacity and safety on a portion of SR 32 by adding an interchange and eliminating several at grade intersections and drives. The new interchange will grade separate Bach-Buxton and SR 32 and will include improvements on Bach-Buxton between Aicholtz Rd. and Old SR 74. Evaluate improvements to Aicholtz Rd. from Eastgate Blvd. to Bach-Buxton. Evaluate improvements to Old SR 74 from Eastgate Blvd. to Bach-Buxton. Evaluate improvements to Old SR 74 and Heitman Lane between Bach-Buxton and Stonlick Olive Branch Rd. 118755~|~1~|~1~|~01/STR~|~plan split. 118755~|~1~|~2~|~02/NFA~|~added plan split for NFA 118755~|~1~|~3~|~03/S5K~|~added STP plan split. 118860~|~1~|~1~|~01/STR~|~plan split. 102757~|~1~|~1~|~01/NHS~|~This plan split is for bridge sealing on NHS route bridges. 102757~|~1~|~2~|~02/IMS~|~This plan split is for bridge sealing on Interstate route bridges. 102757~|~1~|~3~|~03/S>2~|~This plan split is for bridge sealing on the large urban route bridge. 102924~|~1~|~1~|~01/IMS~|~I-75, SR51, and US24 bridges. 90540~|~1~|~1~|~01/STR~|~Replace deteriorated and distorted culvert type bridge with minimal roadwork on SFN 5400066 MER SR 29 0.00 ( bridge length is not long enough to be federally funded.) 119318~|~1~|~1~|~01/MPO/GCEO~|~Construction of a shared use path along Dayton Xenia Road from Ankeney Road to School East Drive. 91160~|~1~|~1~|~01/STR~|~BRO US52 3.58 OH11-02Slide RepairOn US52, begin project 3.58 miles east of the Clermont County Line. Project Description: It is proposed, by Federal Declaration # OH11-02, to repair a rock slide along the Ohio River. 80/20 split01/STR/OT/State 114210~|~1~|~1~|~01/IMS~|~Friction Treatment on two interchanges on I-270. FRA 270/33/161 - Interchange ID 29800 and FRA-270/70 - Interchange ID 25900 80844~|~1~|~1~|~01/NHS~|~4 bridges (NHS) Painting: HOC-93-12.43 SFN 3702138, HOC-328-11.46 SFN 3703908, MEG-7-7.61 (L) SFN 5300150, and MEG-7-7.61 (R) SFN 5300169. NHS route funded 80 federal/20 state. 80844~|~1~|~2~|~02/STR~|~2 bridges (Rural) Painting: VIN-327-10.18 SFN 8202281 and VIN-677-3.47 SFN 8203393. Rural other federal aid funded 80 federal/20 state. 90933~|~1~|~1~|~01/NFA~|~Signage for school zone 106207~|~1~|~1~|~01/IMS~|~FY 2022 Block PID for drainage system maintenance/repair. 122892~|~1~|~1~|~01/NFP~|~All work included in this plan split. 91843~|~2~|~2~|~02/STR~|~General System asphalt resurfacing on HAS-646-0.00 to 6.53 and 15.40 to 16.62.; includes pavement repairs, pavement marking 91843~|~1~|~1~|~01/NFA~|~General System asphalt resurfacing of HAS-646-6.58 to 10.44 and 16.62 to 20.32.; includes pavement repairs, pavement marking 95586~|~1~|~2~|~02/NHS~|~HUR US 0224 15.82-NHS 95586~|~1~|~3~|~03/S<2~|~HUR SR 0099 03.68 95586~|~1~|~1~|~01/STR~|~Remaining locations in the project that are not in split 2 or 3. 95586~|~1~|~4~|~04/NFA~|~CRA-SR-100-03.490 SFN 1702858 Reactive MaintenanceExp jt repair/repl (048)Minor RehabilitationPile encasement (084)Pier repl/repair (085) 104145~|~1~|~1~|~01/ENH/DUA~|~Work in the Defiance Urban area funded by the Transportation Alternatives Program. Funding is 95% federal using Toll Credit. Includes work both inside and outside of the City of Defiance. The Defiance County Engineers Office will provide the match and will collect the necessary funds from the City of Defiance. Work from the beginning of the project at 0.00 to the Defiance Urban Area boundary at 2.47. 104145~|~1~|~2~|~02/ENH~|~Work outside of the Defiance Urban Area funded by the Transportation Alternatives Program. Funding is 95% federal using Toll Credit. The Defiance County Engineer will provide the non-federal funds. Work from the Defiance Urban Area boundary at 2.47 until the end of the project. 118636~|~1~|~1~|~01/SAF~|~Replace existing poor condition guardrail along SR 60 under SR 2 with concrete median barrier. This would include removing existing Type A guardrail end treatments. 98290~|~1~|~2~|~02/S<2~|~Extrusheet sign replacement project. ATH 682 0.20-0.39 and WAS 60 4.45-5.12. Urban other federal aid funded 80 federal/20 state. 98290~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project. ATH 33 14.02-18.77, ATH 50 11.00-11.99, 14.14-14.48, 32.72-33.54 and MEG 33 11.12-11.34. NHS route funded 80 federal/20 state. 122898~|~1~|~1~|~01/ENH/TRCE~|~Install new sidewalks. 115975~|~1~|~1~|~01/IMS~|~District Preservation - 4PS7 (100% State) No CAP - replacement of damaged tower light pole that occurred during crash. 123992~|~1~|~1~|~01/SAF~|~Guardrail installation project on HOC CR 36 0.00-8.018. 98711~|~1~|~1~|~01/NFP~|~Repair of embankment slip 91691~|~1~|~1~|~01/NHS~|~Replace small culverts WAR-42-1710 and WAR-42-1753 123939~|~1~|~1~|~01/BRF/MACE~|~Deck replacement. 123827~|~1~|~1~|~01/NHS~|~Resurfacing. 123827~|~1~|~2~|~02/STR~|~Resurfacing. 101509~|~1~|~1~|~01/ENH~|~Construction of new sidewalk and curb (where necessary) along the north side of Clay Street from Floyd Street eastward for approximately 1200? to Depot Lane. In addition new sidewalk will be constructed through the Community Park property for approximately 300? from the Spray Park driveway to a designated crossing of Dayton Street at the Tillman Lane Athletic Complex intersection. New sidewalk will be constructed on the south side of Dayton Street for approximately 400? westward to meet existing sidewalk. New lighting and signage will be installed, as well as benches and trash receptacles. 102504~|~1~|~1~|~01/NFP~|~Replacement/repair of RPM within District 5. 108263~|~1~|~1~|~01/S<2~|~Slide repair from OH18-01 ER event. DSR BEL-007 120300~|~1~|~1~|~01/BRO~|~Clean and Paint structural steel of bridge carrying SR 9 (Overlap w.SR 43) over Town Creek. 105793~|~1~|~1~|~01/IMS~|~Plan split for bridge work 100976~|~1~|~1~|~01/STR~|~DSR# CAR-001 98139~|~1~|~1~|~01/STR~|~Replace culverts at SLM 0.489 and 2.319.Replace and relocate culvert under TR 156 (Ghormley Rd.) 98139~|~1~|~2~|~02/STR~|~Widen TR 156 at the intersection with SR 41 except culvert. 93722~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/PV/CAMB" City of Cambridge Small City funded project for the rehablitation of Oakland Blvd. Small City funds approved at 80/20 with funding cap of $2,028.112.80. 122010~|~1~|~1~|~01/S>2~|~Intersection improvement 90643~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 106056~|~1~|~1~|~01/NHS~|~Concrete deck overlay. MEG 7 5.80, 7.08 L & R, and 7.61 L & R. NHS route funded 80 federal/20 state. 92351~|~1~|~1~|~01/NFP~|~100% 4CP7/Maint funds for 1 year guardrail ding and dent 111404~|~1~|~3~|~03/IMS~|~Minor bridge work. 111404~|~1~|~2~|~02/IMS~|~Construction of 3rd lane on IR-77 from Ghent Road to Everett Road, in Summit County, Ohio. 111404~|~1~|~1~|~01/IMS~|~Total replacement of existing lanes on IR-77 from Ghent Road to Everett Road, includes culvert replacements, extensions and removals. 106880~|~1~|~1~|~01/ENH~|~Plan Split 108558~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH CR 42 4.48. DSR ATH-011. Rural other federal aid funded 80 federal/20 local ER funds. 81932~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement 109383~|~1~|~1~|~01/NFP~|~Culvert and bridge work in Scioto State Forest. 95131~|~1~|~1~|~01/S<2/KNOX~|~"01/S<2/PV/KNOX" - CEAO Funding 4B77 (80% Federal) / LNTP (20% Local Match) - CAP is $1,641,600 federal dollars for CO & CE requiring a 20% Local Match. County resurfacing of: 1) Kno-CR 80-00.00 to 00.72; 2) Kno-CR 80-01.54 to 01.70; 95131~|~1~|~2~|~02/STR/KNOX~|~"02/STR/PV/KNOX" - CEAO Funding 4B77 (80% Federal) / LNTP (20% Local Match) - CAP is $1,641,600 federal dollars for CO & CE requiring a 20% Local Match. County resurfacing of: Kno-CR 6-06.97 to 13.47; 95131~|~1~|~3~|~03/S<2/MTVE~|~"03/S<2/PV/MTVE" - Resurfacing of CR80 within the Corporation Limits of the City of Mount Vernon. 87244~|~1~|~1~|~01/STR~|~PIK SR124 7.53 - 17.12 Resurfacing ProjectOn SR124, begin 0.02 mile east of CR6 (Lapperell Rd) (SLM 7.53), head east for 9.59 miles and terminate at SR32 (SLM 17.12), it is proposed to resurface the highway with asphalt concrete.Pave Thru Brdgs:6601235 PIK SR124 7.87 Intersect: Shoemaker Hollow Stream6601294 PIK SR124 9.47 Intersect: Trib Of Sunfish Creek6601332 PIK SR124 10.15 Intersect: Tributary Of Sunfish Crk6601359 PIK SR124 11.01 Intersect: Trib Of Sunfish Creek6601456 PIK SR124 14.96 Intersect: Trib Of Sunfish Creek6601464 PIK SR124 15.75 Intersect: Trib Of Sunfish Creek80/20 split01/STR/PV/State 87244~|~1~|~2~|~02/STR~|~PIK SR124 7.53 - 17.12 Resurfacing ProjectBrdgs F/Rehab:6601383 PIK SR124 12.9 Intersect: Morgans Fork6601421 PIK SR124 14.71 Intersect: Leeth Creek80/20 split02/STR/BR/State 115807~|~1~|~1~|~01/STR/GCEO~|~Guernsey County Engineer's CEAO CSTP Program - 4B77 (80% Federal) / LNTP (20 % Local) - See CAP Comment - Project to resurface portions of Broadhead Road (CR 585) and portions of Birmingham Road (CR 585) 115807~|~1~|~2~|~02/NFA/GCEO~|~Guernsey County Engineer Paving Program - LNTP (100% Local) - See CAP Comments - Resurfacing portions of Crane Run Road (CR 26) and portions of Birmingham Road (CR 71). 94187~|~1~|~1~|~01/S>2~|~Project to include several drainage maintenance items along US 50 east of Newtown Road. The improvements include upgrading the north curb inlets at SLM 32.29, 32.41, 32.46 that continually clog, lining the longitudinal CMP storm drains with a sock liner at station SLM 32.41, repairing the catch basin at SLM 32.41, and replacing the culvert at Station 32.96. Drainage between shall be video inspected from Newtown Road to SLM 32.96 by Planning (See Archive 08C1493 for original plans). Other locations may be added. 94187~|~1~|~2~|~02/S>2~|~Water work to be paid 100% by GCWW. 113242~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work. 97514~|~1~|~2~|~02/MPO~|~100% City of Wooster items 97514~|~1~|~1~|~01/MPO~|~Mill & fill 2" w/asphaltic concrete--E. Liberty & Pittsburgh Ave. 93596~|~1~|~1~|~01/NFA~|~Construct Multipurpose/Training structure (building) on D10 HQ campus. Funded 100% state. 105657~|~1~|~1~|~01/STR~|~Replace structures: MRW-19-6.45 over Whetstone CreekMRW-19-6.83 over Snyder Run 119239~|~1~|~1~|~01/STR~|~Resurfacing. 97350~|~1~|~1~|~01/NFP~|~Added plan split due to funding 123426~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 93942~|~1~|~1~|~01/NFP~|~This is the district's FY 15 district wide lighting maintenance construction contract using 4CP7 sac. 88813~|~1~|~1~|~01/STR~|~Split includes repalcement of bridge CLI-133-0167 and CLI-133-0702 (both are twin Corrugated Metal Pipes) with new structures. Split includes incidnetal roadway work necessary to replace these structures. 115936~|~1~|~1~|~01/ENH~|~Construction of a multiuse trail along former railroad alignment. 97178~|~1~|~1~|~01/SAF~|~Widen the intersection to install left-turn lanes; upgrade the traffic signal; access management where feasible; and improve the turning radius at Limestone and St. Andrews Boulevard 97178~|~1~|~2~|~02/SAF~|~Addition of sidewalk along the project. 84201~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2014. Various routes and sections in D-10. Routes include: ATH 78, ATH 550, MRG 78, NOB 78 and WAS 550. Funded 80 federal/20 state. 84201~|~1~|~2~|~02/NHS~|~Guardrail upgrade/replacement contract for FY 2014. Various routes and sections in D-10. Route on NHS ATH 500 1.00-2.07. Funded 80 federal/20 state. 121548~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m. 94378~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds SAC 4PS7. 100175~|~1~|~1~|~01/S<2~|~City of Jackson McCarty Lane MR 98R 0.00-0.70 100175~|~1~|~2~|~02/S<2~|~City of Jackson McCarty LaneMR 98R SLM 0.70-1.40 East segment Only (Acy Ave to Bridge)CR 98 0.00 -0.08 80107~|~1~|~1~|~01/IMS~|~FAY-71: 0.00-9.47 resurfacing 80107~|~1~|~2~|~02/IMS~|~12 structures (not BR eligible):2401681 FAY IR71 0.29 Intersect: Grassy Branch2401711 FAY IR71 0.29 Intersect: Grassy Branch2401746 FAY CR13 0.49 Intersect: Over Cr 132401770 FAY CR13 0.49 Intersect: Over Cr 132401924 FAY IR71 3.02 Intersect: Rattlesnake Creek2401959 FAY IR71 3.02 Intersect: Rattlesnake Creek2401983 FAY SR435 3.77 Intersect: Over Sr-4352402017 FAY SR435 3.77 Intersect: Over Sr-4352402041 FAY IR71 7.19 Intersect: Sugar Creek2402076 FAY IR71 7.19 Intersect: Sugar Creek2402106 FAY IR71 7.33 Intersect: Over Abandoned Dt&I Rr2402130 FAY IR71 7.33 Intersect: Over Abandoned Dt&I Rr 92041~|~1~|~1~|~01/NHS~|~Federal Emergency project Disaster event OH11-02 DSR COL-009 to fix failing culvert. 81334~|~1~|~1~|~01/NHS~|~Road reconstruction 81334~|~1~|~2~|~02/S<2~|~Non-NHS Segments. 86937~|~1~|~1~|~01/S>2~|~Plan Split for SUM SR 8 20.27 to 21.32 92763~|~1~|~2~|~02/S<2~|~Repair of various structures: SFN 5000181 over Cranberry Run, SFN 7804059 over Crab Creek, SFN 5002060 over Sugar Creek, SFN 5003997 over Burgess Run 92763~|~1~|~1~|~01/STR~|~Repair of various structures SFN 5003059 over N. Jackson Ditch, SFN 5001242 over MId Fork Little Beaver Creek, SFN 5001714 over Tri. Morrison Creek. ATB-SR534-10.57 sfn# 0406953. 103849~|~1~|~1~|~01/S>2~|~Bridge repair on NHS route bridges. 109666~|~1~|~1~|~01/NFP~|~Spot paving various locations 81283~|~1~|~1~|~01/BRF~|~Bridge replacement of sfn# 7632789 over the East branch of the Nimishillen Creek, in Plain Township, Stark County, Ohio. 81283~|~1~|~2~|~02/NFP/Cant~|~City of Canton waterline work. 100% Local cost. 92897~|~1~|~1~|~01/NHS~|~Signals 92897~|~1~|~2~|~02/NHS~|~Change order for nonreturnable signal materials (4PS7). 106633~|~1~|~1~|~01/ENH~|~Plan split 91684~|~1~|~2~|~02/NHS~|~This split is for the NHS bridges on the project. 91684~|~1~|~3~|~03/STR~|~District Wide bridge maintenance for FY2017. This plan split for the rural locations. 91684~|~1~|~1~|~01/IMS~|~District Wide bridge maintenance for FY2017. This plan split for the interstate locations. 86216~|~1~|~1~|~01/BRO~|~Abutment repair work on I-71 structure:4903188 MAD IR71 4.54 Intersect: Mud Run01/BRO/BR/ 115919~|~1~|~1~|~01/SAF/CCEO~|~"01/SAF/PV/CCEO" - 90% Federal (4HJ7) and 10% State (4BC7) - widening of CR 12 for buggy lane 100242~|~1~|~1~|~01/NFP~|~All work in this project. 110467~|~1~|~1~|~01/SAE~|~Implement access management by closing driveways and restricting driveway movements along SR 73 and Main St. 109859~|~1~|~1~|~01/NHS~|~ROS 23 8.23-16.32ROS 35 34.50-36.98 109859~|~1~|~2~|~02/S<2~|~ROS 28 15.98-17.30ROS 50 16.93-18.67 / 19.35-19.67 109859~|~1~|~3~|~03/STR~|~ROS 28 8.80-15.98ROS 50 29.02-32.14 / 33.35-34.89 109859~|~1~|~4~|~04/S<2~|~Local Match - ChillicotheROS 104 13.11-14.40ROS 772 15.27-16.14ROS 50 21.78-24.13 104994~|~1~|~1~|~01/NFP~|~District Preservation Other Funding - 4PS7 (100% State) - No CAP - Application of Fast Dry Pavement Markings in District 5. 119206~|~1~|~1~|~01/IMS~|~Plan split for conduit rehab. 95552~|~1~|~1~|~01/STR~|~It is proposed on SR247 begining at its intersection with West Main St. in West Union (SLM 7.41) heading north and terminating at its intersection with SR32 (SLM 17.12), it is proposed to resurface the highway with asphalt concrete.80/20 split 95552~|~1~|~2~|~02/STR~|~Bridge Plan Split 101034~|~1~|~1~|~01/NHS~|~Upgrade the traffic signals at the intersections of SR741/Lyons Road and SR 725/Yankee Street to install backplates and dilemma zone detection. CCTV camers will also be installed at both intersections. 90756~|~1~|~1~|~01/ERD~|~Project includes the complete rehabilitation of Bridge GRE-TR 47-Anderson Fork Pedestrian (SFN: 2935465), a timber truss covered bridge, maintaining the historic integrity of the structure. 96171~|~1~|~1~|~01/NFA~|~This project is moves the County Garage to the District Complex and constructs salt and equipment buildings 115752~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving 115752~|~1~|~2~|~02/S<2/NRWD~|~Plan Split for the 100% City items on the urban paving 120668~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the installation of turn lanes on US-20 & re-aligning the south leg of CR-3 84586~|~1~|~1~|~01/NHS~|~Resurfacing of US-30 from SLM 31.96 to SLM 33.45 in the Village of Minerva, Stark County, Ohio. And State Route 183 from SLM 16.18 to SLM 16.40. 84586~|~1~|~3~|~03/STR~|~Resurfacing of State Route 183 from SLM 5.88 to SLM 16.18, in the Village of Minerva and Paris Township, Stark County, Ohio. 84586~|~1~|~2~|~02/NHS~|~Structure work on SFN# 7601204, STA-US30-32.63 over the Big Sandy Creek, in the Village of Minerva, Stark County, Ohio. 84586~|~1~|~4~|~04/STR~|~Structure work on SFN# 7605625, STA-SR183-5.99 over Sandy Creek, in the Village of Minerva, Stark County, Ohio. 93588~|~1~|~1~|~01/ENH~|~Added pedestrian connections for Athens City Schools using the Safe Rotes to School funding, 100% Federal. Begin at Athens Middle School and end at 2nd and Watt Streets. 111250~|~1~|~1~|~01/ENH~|~Trans. Alt. Funding Plan split 107400~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Rehabilitation of SFN 4502973 carrying CR 41 (Mink Road) over IR 70 119975~|~1~|~1~|~01/ENH~|~Upgrading deficient curb ramps in the City of Athens. Work includes the full removal/replacement or installation of detectable warnings. 102988~|~1~|~1~|~01/STR~|~Bridge replacement project on GAL 218 5.78, SFN 2702584. Rural other federal aid funded 80 federal/20 state. 116327~|~1~|~1~|~01/S<2~|~Resurfacing from SLM 0.28 to SLM 4.35 116327~|~1~|~2~|~02/STR~|~Resurfacing from SLM 4.35 to SLM 5.45 82974~|~1~|~1~|~01/NHS~|~District Wide Crack Sealing project for the Priority System for FY2016, Routes included are BUT-4 and HAM-42 100585~|~1~|~1~|~01/STR~|~ADA 348 0.00-13.55BRO 123 0.76-3.46BRO 756 0.00-1.97BRO 505 0.00-10.39 100585~|~1~|~2~|~02/NFA~|~BRO 123 0.00-0.76 107735~|~1~|~1~|~01/STR~|~Covers all work to rehab bridge. 116023~|~1~|~1~|~01/NHS~|~Bridge maintenance work. 109508~|~1~|~1~|~01/IMS~|~Bridge hit, Emergency B repairs to the linked structure. 84591~|~1~|~1~|~01/IMS~|~District Allocation 90/10 107734~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 5.95-6.00. DSR MOE-003. Funded 100% federal. 108180~|~1~|~1~|~01/NHS~|~Rock fall repair from OH18-01 ER Event. 96812~|~1~|~1~|~01/S>2~|~Intersection improvement of CR106/TR107. 96812~|~1~|~2~|~02/BRF~|~Structure rehabilitation - deck replacement of CR106 over Alum Creek. 105209~|~1~|~3~|~03/NHS~|~Replacing structure 10' to 20' span. 105209~|~1~|~1~|~01/NHS~|~Resurfacing. 105209~|~1~|~2~|~02/NHS/YOUN~|~SR 616/US 422 intersection items including ADA curb ramps, manhole, valve and monument box adjustments. 124875~|~1~|~1~|~01/S5K~|~Small City funding 116734~|~1~|~1~|~01/IMS~|~Split for resurfacing work. 109743~|~1~|~1~|~01/STR~|~AC overlay without repairs 120572~|~1~|~1~|~01/STR~|~Washington Street Sidewalk Replacement 97313~|~1~|~1~|~01/STR~|~It is proposed, using CEAO Safety Funds, to install new and upgrade existing pavement markings on various routes within Jackson County. 119216~|~1~|~1~|~01/NHS~|~NHS plan split. 119216~|~1~|~2~|~02/S>2~|~City of Worthington Plan Split 119216~|~1~|~3~|~03/S>2~|~City of Columbus Plan Split 121105~|~1~|~1~|~01/MPO~|~Primary plan split for MPO CRP funded scope. 108415~|~1~|~1~|~01/NFA~|~Widening of Tallmadge Rd. 106148~|~1~|~1~|~01/S<2/BPRT~|~ER Event OH17-01, DSR BEL-007 104115~|~1~|~1~|~01/NFP~|~plan split 121721~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs ASD-250-17.325 to 18.866 including bridge maintenanceFine Graded Polymer Asphalt Concrete Overlay (smoothseal) ASD-250-18.866 to 24.745 including bridge maintenance 121721~|~1~|~2~|~02/NHS~|~Asphalt Concrete Overlay with Repairs ASD-250-17.325 to 18.866 100% Local Funding 121721~|~1~|~3~|~03/NHS~|~Asphalt Concrete Overlay with Repairs ASD-250-17.325 to 18.866 Fed / Local Funding 116659~|~1~|~1~|~01/S>2~|~Plan split for the large urban locations 116659~|~1~|~2~|~02/STR~|~plan split for the rural locations 124739~|~1~|~1~|~01/SAF~|~Traffic Signal Replacements: LOR-82 @ Durkee Rd, LOR-82 @ LOR-83, LOR-82 @ Island Rd, LOR-18 @ LOR-301Overhead Flasher Replacement: LOR-57 @ LOR-82100% State TSMO Funding 94064~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - ODNR Funds 4BF7(100% State) - No CAP - Resurfacing within the Woodbury Wildlife Area 106136~|~1~|~1~|~01/NHS~|~Replacement of linked structure 10 ft to 20 ft span. 106136~|~1~|~2~|~02/NHS/HUDS~|~Multi-purpose trail/path. Removal of barnstone. City of Hudson 100% expense. 106136~|~1~|~3~|~03/NHS/HUDS~|~Culvert replacements. 83645~|~1~|~2~|~02/STR~|~80/20 fed/state funding split for all work using federal rural STP funds from SLM 30.48 to SLM 31.93. 83645~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal urban STP funds from SLM 28.30 to SLM 30.48. 114203~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay treatment. NOB 77 0.00-1.56 and WAS 77 16.40-17.64. 114203~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 114289~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8. 114289~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. 103157~|~1~|~1~|~01/NFA~|~Construction of an access road between Mill Street and Stimson Avenue with associated intersections improvements. 101294~|~1~|~1~|~01/STR~|~FUL-120 and WIL-49 117609~|~1~|~1~|~01/BRF~|~Bridge rehab. 107328~|~1~|~1~|~01/NFA~|~HIG 771 0.00-6.11 107328~|~1~|~2~|~02/STR~|~JAC 776 0.00-9.28PIK 776 0.00-0.99SCI 776 0.00-2.69 107328~|~1~|~3~|~03/S<2~|~JAC 776 9.28-11.44 97321~|~1~|~1~|~01/NFP~|~Ohio's & WVDOH's share of the East Huntington Bridge painting project. Includes Inspection. 83147~|~1~|~1~|~01/IMS~|~100% State Noise Wall funding 113895~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 93200~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing with asphalt concrete in Dayton on SR 4 from SLM 16.53 (Patterson Street) to SLM 17.06 (Keowee Street). 99012~|~1~|~1~|~01/BRO~|~Bridge Split 99012~|~1~|~2~|~02/BRO~|~Veterans Memorial 124031~|~1~|~1~|~01/NHS~|~Interchange Improvement at US 23 and Home Rd 120886~|~1~|~1~|~01/NFA~|~Created for J&C involvement 124328~|~1~|~1~|~01/ENH~|~Sidewalk project in Savannah - Tap Funded 92142~|~1~|~2~|~02/NHS~|~80/20 fund split for federal NHS route bridges not eligible for BR funds: 4300092, 4301293 92142~|~1~|~3~|~03/BRO~|~80/20 split for bridges eligible for federal BR funding: 4300122, 4300300, 4300335 92142~|~1~|~1~|~01/IMS~|~90/10 fund split for federal IM funds for the following bridges: 1802054, 1803549, 1814079, 1814664, 4303660, 4303695, 4303784, 4303814, 4303962, 4303997, 4304233 93624~|~1~|~1~|~01/NHS~|~Lengthen turn lanes along US 33 Super 2. Ath US 33 20.52-20.70, 23.16-23.34 and 26.19-26.37, all segments LT and RT. Federal 80%/State 20%. 103830~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate bridges. 99599~|~1~|~1~|~01/NFP~|~District 11 guardrail reconstruction and repair. 110275~|~1~|~1~|~01/NHS~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 21.86-22.20. NHS route funded 80 federal CMAQ/20 local. 110275~|~1~|~2~|~02/NHS~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 21.86-22.20. NHS route funded 100 Local. 107740~|~1~|~1~|~01/STR~|~Culvert 112755~|~1~|~1~|~01/MPO~|~Resurfacing of New Milford Rd from Tallmadge Rd to SR 5/SR 44 bypass and Tallmadge Rd from SR 44 to Alliance Rd. 107522~|~1~|~1~|~01/NFA~|~Resurfacing COL-164 from SLM 18.00 to SLM 21.54 107522~|~1~|~2~|~02/S<2~|~Resurfacing SLM 21.54 to SLM 22.23 107953~|~1~|~1~|~01/IMS~|~Landscape maintenance and upkeep on existing landscape at the I-70/I-75 interchange in Montgomery County. 119868~|~1~|~1~|~01/IMS~|~Spring Remediation. 121855~|~1~|~1~|~01/S5K/CAMB~|~Repair and replacement of sidewalks and curb ramps along South 11th Street. (TAP Safety 80% 4B37/20% 4HJ7) 94334~|~1~|~1~|~01/STR~|~From SLM 2.52 to SLM 9.22 94334~|~1~|~2~|~02/STR~|~Wil-49 culvert @ SLM 4.07 94334~|~1~|~3~|~03/BRO~|~Plans split for bridge work - Deck sealing 94334~|~1~|~4~|~04/NHS~|~Add pressure relief joints - Wil-6-3.55 98324~|~1~|~1~|~01/SAF~|~80% federal using with 20% local match on SRTS eligible work items. 75117~|~1~|~2~|~02/NHS/ADA~|~test 75117~|~1~|~3~|~03/NHS~|~test 75117~|~1~|~4~|~04/IMS~|~test 75117~|~1~|~5~|~05/IMS~|~teast 75117~|~1~|~6~|~06/ERD~|~astdas 75117~|~1~|~1~|~01/S<2/camp~|~Ut non eros ac libero suscipit imperdiet. Nulla facilisi. Nullam a velit arcu, sed feugiat velit. Sed ligula ante, consequat ut euismod ultrices, aliquet eu elit. Ut tempor turpis sed ipsum rhoncus ac bibendum nibh placerat. Etiam leo nunc, vestibulum a fermentum id, condimentum id orci. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia Curae; Vestibulum non magna condimentum ligula semper faucibus. Suspendisse ac ligula lacus. 75117~|~1~|~7~|~07/IMS~|~Test 75117~|~1~|~8~|~08/IMS~|~Test 95860~|~1~|~1~|~01/NFP~|~@ SLM 30.60 115116~|~1~|~1~|~01/BRF~|~Rehabilitation/replacement of historic bridge (SFN 4131126), funded at 100 with CEAO 4B87 funds and 80/20 split with BHJ 4TA7 funds up to respective caps. 22215~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1810421 101297~|~1~|~1~|~01/STR~|~OTT-590-0.00 to 4.02 106883~|~1~|~1~|~01/NFP~|~Loop detector maintenance. 110166~|~1~|~1~|~01/STR~|~Culvert Repair/Replacement 110166~|~1~|~2~|~02/NHS~|~Culvert Repair/Replacement 98161~|~1~|~1~|~01/ENH~|~Creekside Trail: from Alpha Road in Beavercreek Township to Xenia Station in Xenia. Apply 1.5 inches of asphalt over the existing surface course. Installation of a 3' wide topsoil berm against new pavement with seed, fertilizer, and mulch. Application of thermoplastic pavement markings with silica sand for skid resistance. Full depth pavement repairs where needed. 110815~|~1~|~1~|~01/NFP~|~ODNR Roadway Maintenance Program project to resurface Main Road in Findley State Park 119413~|~1~|~1~|~01/NFA~|~NOB TR 392 0.02 Bridge Replacement 121202~|~1~|~1~|~01/STR~|~Culvert replacement project. MRG 669 2.09. CFN 1876967. 114882~|~1~|~1~|~01/STR~|~Rural plan split 107245~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 12.89. GSM funded. Rural other federal aid funded 80 federal/20 state. 113347~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (State 100%) - No CAP - Annual contract for mowing along the Interstate and interstate look-a-likes in District 5 80075~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Slip repair on MUS US22 19.92-19.96 98625~|~1~|~1~|~01/SAF~|~Sidewalks 112253~|~1~|~1~|~01/IMS~|~All items of work on DEL-71 83709~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 664 16.33-16.54. Urban other federal aid funded 80 federal/20 state. 83709~|~1~|~4~|~04/S<2~|~Curb ramps and gutter work within the city. HOC 664 15.94-16.33. Urban other federal aid funded 100% Local. 83709~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 180 0.49-7.35, and HOC 664 16.54-24.50. Rural other federal aid funded 80 federal/20 state. 83709~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 664 15.94-16.33. Urban other federal aid funded 80 federal/ 20 local. 120105~|~1~|~1~|~01/NFP~|~Covered bridge deck replacement. 96668~|~1~|~1~|~01/NHS~|~Plan split for all pavement work in the project. The work includes mainline and ramps within the project between SLM 20.94-27.23. 96668~|~1~|~2~|~02/NHS~|~Profile correction. 92950~|~1~|~1~|~01/SAF~|~Installation of 33 uninterruptable power supplies in various locations in Clark, Miami, and Montgomery Counties. 85207~|~1~|~2~|~02/ERD~|~80/20 funding split for Transportation, Community and System Preservation Program Earmark TC1101. 85207~|~1~|~1~|~01/S>2~|~Multiple fund sources the intersection work:90% federal - 10% local funding split utilizing federal safety funds.80% federal - 20% local funding split utilizing MPO CMAQ funds 124679~|~1~|~1~|~01/S5K~|~Road reconstruction project 114264~|~1~|~1~|~01/MPO~|~Construction of a shared use path along E. Main Street from Dela Palma to SR 133. 91862~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete in Sidney on State Route 47 from Fourth Street (SLM 14.51) to Ohio Avenue (SLM 15.46) 87577~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation - No CAP - Location = 4202252 KNO US62 18.82 Intersect: East Br Jelloway Cr - - SFN 4202252 qualifies for replacement - Length - 53' - SD(1) - SR 24.3 101743~|~1~|~1~|~01/STR~|~Resurfacing 7.32 miles of two-lane road. WAS CR 2 5.57, CR 3 13.19. Work includes spot base repair, striping and the removal/replacement of RPMs. Funded 80 federal/20 local. 97846~|~2~|~2~|~02/BRF~|~OBPP replacement of SFN 4130227 97846~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 4130235 96737~|~1~|~1~|~01/ENH/KNOX~|~"01/ENH/OT/KNOX" - Knox County TA project for construction of dual use path - Federal approved max of $97,782. 116698~|~1~|~1~|~01/S5K~|~This plan split is for the signal work at the locations in Columbiana County on SR 170 and SR 267. 116698~|~1~|~2~|~02/S50~|~This plan split is for the signal work on US 40 and CR 28A in Belmont County. 116698~|~1~|~3~|~03/STR~|~This plan split is for the signal work on SR 800 in Tuscarawas County. 101761~|~1~|~2~|~02/S5K~|~Resurfacing along STP Urban routes outside of city of Zanesville 101761~|~1~|~1~|~01/STR~|~Resurfacing along STP Rural routes 101761~|~1~|~3~|~03/S5K/ZANE~|~Urban paving within city of Zanesville 115545~|~1~|~1~|~01/NFA~|~Paving Lost Creek Metro Park lot at new building site. 111041~|~1~|~1~|~01/NHS~|~LAW-52-18.61 111041~|~1~|~2~|~02/STR~|~LAW-243-6.81LAW-243-6.94 89198~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 107452~|~1~|~1~|~01/NHS~|~See linked structure > 20' span. 107452~|~1~|~2~|~02/NHS~|~Aqua Ohio water line replacement in the City of Massillon. 113832~|~1~|~1~|~01/BRF/GCEO~|~Guernsey County Engineer's Ohio Bridge Partnership Program - 5BP7 (100% Bond) - See CAP Comments - Replacement of SFN 3030776 85076~|~1~|~1~|~01/MPO/Nort~|~New capacity and safety improvement on Cleveland-Massillon Road (CR-17), from Greenridge (SLM 8.99) to Pleasant (SLM 8.42), in the City of Norton, Summit County, Ohio. 84471~|~1~|~1~|~01/STR~|~plan split for roadway work in the Rural sections:CLI-28: SLM 0.37-5.48 96596~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 285 0.96, 1.02, 1.58, 2.39, 3.31, 3.47, 8.11, and NOB 340 5.67. Rural other federal aid funded 80 federal/20 state. 109502~|~1~|~1~|~01/NFP~|~Install fiber optic cable along IR 71 86943~|~1~|~1~|~01/STR~|~Resurfacing of ATB State Route 534 from SLM 13.50 to SLM 18.61, in Trumbull and Harpersfield Townships, Ashtabula County, Ohio. 86943~|~1~|~3~|~03/S<2~|~Resurfacing of State Route 534 from SLM 18.61 to SLM 19.75, Harpersfield Township, Ashtabula County, Ohio. 86943~|~1~|~2~|~02/STR~|~Bridge rehabilitation of SFN# 0407054, ATB-SR534-16.61 over Bronson Creek and SFN# 0407089, ATB-SR534-18.32 over Grand River, Harpersfield Township, Ashtabula County, Ohio. 86943~|~1~|~4~|~04/IMS~|~Bridge rehabilitation of SFN# 0407119, ATB-SR534-19.32 over Interstate 90-2.95, Harpersfield Township, Ashtabula County, Ohio. 116340~|~1~|~3~|~03/STR~|~plan split for the rural sections 116340~|~1~|~2~|~02/S>2~|~plan split for the large urban portions 116340~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of GRE-725 122174~|~1~|~1~|~01/STR~|~Culvert repair on ATH SR 144 4.082, SFN 1876926. 101760~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Plan Split 1 106549~|~1~|~1~|~01/NFP~|~Resurfacing sections of Hueston Woods State Park. 121134~|~1~|~1~|~01/IMS~|~Mowing locations in D8 121134~|~1~|~2~|~02/IMS~|~Mowing locations in D7 116150~|~1~|~1~|~01/S5K~|~Plan Split 01/S5K/PV/ - Plan Split for MUS-146-9.925-10.390, 10.49-12.356, 12.482-13.01 116150~|~1~|~2~|~02/STR~|~Plan Split 02/STR/PV/ - for MUS-146-2.21 to 9.925 116150~|~1~|~3~|~03/S5K/ZANE~|~Plan Split 03/S5K/PV/ZANE - for Mus-146-10.39 to 10.49, 12.356 to 12.482, 13.010 to 13.313 122951~|~1~|~1~|~01/IMS~|~Emergency repairs to the Daniel Carter Beard bridge. Design Bid Build (Type 3 ER contract) for repairs that are needed but not absolutely necessary to reopen I 471 SB traffic. 121324~|~1~|~1~|~01/STR~|~STP Rural plan split. 88219~|~1~|~1~|~01/ENH~|~Construct a bikepath in Kettering from Jane Newcom Park to Hempstead Station Drive. 100771~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: LOR 113 SLM 0.00-2.38, 3.12-4.22, 7.45-9.34 100771~|~1~|~2~|~02/S<2~|~STP < 200,000 Resurfacing: LOR 113 SLM 2.38-3.12, 4.22-6.48, 9.34-11.66 100771~|~1~|~3~|~03/STR~|~Bridge Work: LOR-113-8.46 100771~|~1~|~4~|~04/S<2~|~Bridge Work: LOR-113-10.61 (L&R) 100771~|~5~|~5~|~05/S<2~|~Nolfolk Southern Rail Road Construction Engineering Costs 87470~|~1~|~1~|~01/STR~|~100% state funding on the non-NHS routes 87470~|~1~|~3~|~03/NFA~|~100% local participation for the relocation of county sanitary force main. 87470~|~1~|~2~|~02/NHS~|~Work on the SR-306 locations. 118894~|~1~|~1~|~01/NFA~|~Resurfacing SR 646 116075~|~1~|~1~|~01/S<2~|~Bridge Replacement. 115162~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr ERI SR 02 00.00 - 01.77 115162~|~1~|~2~|~02/BRO~|~Bridge Work to be Determined at a latter date. 120232~|~1~|~1~|~01/ENH~|~Multi-Use at the Norwalk Reservoir - TAP Funding 121142~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 121142~|~1~|~2~|~02/NHS~|~Resurfacing US 250 109256~|~1~|~1~|~01/NFP~|~Add Split - 2019 Operations Chip Seal 102362~|~1~|~1~|~01/NFP~|~Demolition of three structures and one billboard. 95459~|~2~|~2~|~02/NFA~|~Replacement of three (3) structures - SFNs 6005349, 6005373, and 6005403 95459~|~1~|~1~|~01/NFA~|~Major rehabilitation of pavement and maintenance of four (4) bridges. 95459~|~1~|~3~|~03/SAF/TVSD~|~Sidewalk replacement work (MUS SR 208 0.67 to 0.74) 96119~|~1~|~1~|~01/STR~|~MAR-37-7.30 culvert 93258~|~1~|~1~|~01/STR~|~Remove and replace deck overlay. Patch backwalls, reface abutments with annodes, repair deck edges, encase peir piling patch and rebuild wingwalls on SFN 0603066 AUG 219 0312 99011~|~1~|~1~|~01/NHS~|~Install left turn lanes on north and south approaches to improve the safety and opertaion of the intersection - 800 feet south to 1100 feet north of the intersection with Nutt/Hibberd - MOT SR 48 1.02 to MOT SR 48 1.41 104936~|~1~|~1~|~01/MPO~|~Construction of a multi-lane modern roundabout to replace the existing partial clover interchange of SR-126 with US-22. 104936~|~1~|~2~|~02/NFP~|~Split for 100% local utility cost. Waterline improvements to accommodate future development adjacent to the project, and moving of utilities underground. 88612~|~1~|~1~|~01/STR~|~Replace bridge (not BR eligible for replacement)SFN 6502512, PIC-138-5.27, Little Yellowbud Ck 93196~|~1~|~1~|~01/IMS~|~Crack sealing the existing pavement on MOT Interstate 75 from SLM 18.24 to 24.42 and on MIA Interstate 75 from 0.00 to 4.92. 110940~|~1~|~1~|~01/S>2~|~Split for Urban Paving work 110940~|~1~|~2~|~02/S>2~|~Plan split for item that are not eligible for Urban Paving Funds, 100% Local 117602~|~1~|~1~|~01/BRF/LCEO~|~Replacement of LIC CR 539 0.05 (SFN 4536150) carrying Moots Run Road over Raccoon Creek. 89303~|~1~|~1~|~01/NHS~|~DEL-23, FRA-33, FRA-104, FRA-161, FRA-315, UNI-33NHS locations for sign replacements 89303~|~1~|~2~|~02/S>2~|~FRA-104, FRA-315 STP Columbus area location for sign replacementsFRA-315: 12.45-12.79 (N of I-270)FRA-104: 6.53-8.02 (2 lane portion of SR-104) 89303~|~1~|~3~|~03/IMS~|~MAD-70 0-15.57FRA-70 0-3.41, 15.24-24.94Sign replacements 89303~|~1~|~4~|~04/IMS~|~Install sign for John Glenn International Airport on IR 670 101626~|~1~|~1~|~01/NHS~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 117001~|~1~|~1~|~01/CMQ/OXF~|~Construction of a shared use path connecting Talawanda Middle and High Schools, and a new regional transit facility on Chestnut Street. 115754~|~1~|~2~|~02/S5K/TREN~|~Plan split for the 100% City items on the urban paving on BUT-73 115754~|~1~|~1~|~01/S5K~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on BUT-73 117373~|~1~|~1~|~01/BRO~|~Complete structure replacement via CEAO BFP (80%) up to Federal Maximum. 92971~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-US 40-13.27 to 14.37; 2) Lic-US 40-16.66 to 19.59; 92971~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Lic-US 40-14.37 to 16.66 106389~|~1~|~1~|~01/NHS~|~Urban Paving Split for pavement between intersection from Ford St.(15.61) to Detroit Ave. (18.59) 106389~|~1~|~2~|~02/SAF~|~Plan Split 106389~|~1~|~3~|~03/CMQ~|~CMAQ Plans Split for the Bike Trail along US24 106389~|~1~|~4~|~04/NHS~|~Landscaping & lighting 111506~|~1~|~1~|~01/STR~|~Slide Repair 99602~|~1~|~1~|~01/BRO~|~Repair structure TUS-800-2844 (SFN 7906706) by replacing the existing wearing surface with a rigid concrete overlay, replacing the backwalls, end cross frames and expansion joints. The project will also upgrade the bridge railing, making the necessary modification to the deck edges and structural steel. The existing steel beams will be cleaned and painted. 80105~|~1~|~1~|~01/MPO~|~US23/Penn Ave interchange modification80% MORPC STP & 20% local (City of Delaware) up to funding cap01/MPO/PV/ 112731~|~1~|~1~|~01/NHS~|~MAD-40-14.82 and MAD-40-16.10 - structure replacement. 107363~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2024 and 2025 herbicidal spraying. Funded 100% state. 76816~|~1~|~1~|~01/NHS~|~80/20 funding split for all work using major rehab funds 115885~|~1~|~1~|~01/SAF~|~Work at SR 309 railroad crossing 105500~|~1~|~1~|~01/STR~|~Resurfacing various locations, MAD38, MAR 47, MRW 61, PIC 762. 105500~|~1~|~2~|~02/STR~|~Resurfacing various location, MAD 38, MAR 47, MRW 61, PIC 762. 105500~|~1~|~3~|~03/NHS~|~Resurfacing US 23 105500~|~1~|~4~|~04/NHS~|~Resurfacing US 23 100936~|~1~|~1~|~01/NHS~|~Resurfacing. 100936~|~1~|~2~|~02/NHS~|~Minor bridge work. 114496~|~1~|~1~|~01/S>2~|~This plan split covers all work associated with the construction of the multi-use path. 105277~|~1~|~1~|~01/STR~|~Resurfacing of HAS-519 and HAS-646 100293~|~1~|~1~|~01/IMS~|~Microsurfacing of SUM IR 271 from 8.54 to 10.91 100293~|~1~|~2~|~02/NHS~|~Double Microsurfacing of SUM SR 59 from 8.42 to 9.51 100293~|~1~|~3~|~03/S>2~|~Double Microsurfacing of SUM SR 8 from 19.04 to 19.22 and from 19.45 to 20.27. 100293~|~1~|~4~|~04/S>2/MACE~|~Double Microurfacing of SUM SR 8 from 18.58 to 19.04 and 19.22 to 19.45, urban paving 80/20 items in the City of Macedonia. 95193~|~1~|~1~|~01/BRF~|~SFN 2635070, structure on TR-25 over Flat Run 95174~|~1~|~1~|~01/SAF/LCEO~|~"01/SAF/OT/LICK" County Engineer's Association Organization Pavement Marking 4HB7(100% Federal) - CAP of $150,000.00 federal - Pavement Marking on routes to be determined 112130~|~1~|~1~|~01/SAF~|~Funding split for safety related items 82836~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 4302400 92321~|~1~|~1~|~01/S<2~|~Bridge rehabilitation on ATH-682-2.14, SFN 0504742. Work includes backwall repair, approach slab, and expansion joint replacement. Funded 80 federal/20 state. 107657~|~1~|~1~|~01/SAF~|~Plan split for TSMO work 103920~|~1~|~1~|~01/STR~|~Culvert Replacements: WAY-301-4.50 / WAY-604-20.65 108640~|~1~|~1~|~01/SAF~|~Install a Restricted Crossing U-Turn (RCUT) at the intersection of US Route 42 and Spring Valley Paintersville Road. 90388~|~1~|~1~|~01/MPO~|~Major widening of Hamilton Road in Gahanna 103113~|~1~|~1~|~01/NFA~|~The Village of Columbus Grove proposes a new northbound turn lane on SR65 at Progressive drive along with an upgrade of the corner radii at the intersection. Additionally eastbound left and right turn lanes need to be marked to better utilize the existing three lane pavement on Progressive Dr. 113183~|~1~|~1~|~01/STR~|~Placeholder until project is scoped and locations are identified. 98225~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on various OFAH-Rural routes. 98225~|~1~|~2~|~02/IMS~|~District Preservation Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on Interstate Routes 98225~|~1~|~3~|~03/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on various NHS routes. 98225~|~1~|~4~|~04/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes 95530~|~1~|~1~|~01/MPO~|~MORPC & ODOT funding for 11 traffic surveillance camera upgrades at:33/317, 33/Gender Rd, 70/Courtright, 33/Post, 161/Little Turtle, 161/Hamilton, 270/McCutcheon, 315/Town, 315/Ackerman, 315/670WB, 70/Mound 95530~|~1~|~2~|~02/MPO~|~MORPC & Columbus funding for traffic surveillance camera upgrade 95530~|~1~|~3~|~03/SAF~|~100% 4IS7 funding for new fence gates at 71/Hudson and 71/Weber 122494~|~1~|~1~|~01/S50~|~Roadway minor rehab utilizing Oil & Shale funds at 100% up to the State maximum. 80021~|~1~|~1~|~01/NHS~|~ROS US23 0.00 - 8.39 Resurfacing Project Project Termini: Pike County Line north to 0.05 mile south of intersection with SR104 Project Description: It is proposed to resurface a portion of US23. Brdg to be paved thru:7100094 ROS US23 0.75 Intersect: Crooked Creek7100167 ROS US23 1.47 Intersect: George Hollow Run7100191 ROS US23 1.64 Intersect: Stream7100302 ROS US23 7.7 Intersect: Indian Creek80/20 split01/NHS/PV/State 80021~|~1~|~2~|~02/NHS~|~ROS US23 0.00 - 8.39 Resurfacing Project Project Termini: Pike County Line north to 0.05 mile south of intersection with SR104 Project Description: It is proposed to resurface a portion of US23. Brdg's for rehab.7100035 ROS US23 0.39 Intersect: Crooked Creek7100124 ROS US23 1.09 Intersect: Crooked Creek7100213 ROS US23 4.9 Intersect: Indian Creek7100272 ROS US23 6.74 Intersect: N Branch Of Indian Creek80/20 split01/NHS/BR/State 117541~|~1~|~1~|~01/NHS~|~Plan split for slide repair 119859~|~1~|~1~|~01/SAF~|~Plan Split for Safety funded scope to enhance crossings and add new sidewalks. 119859~|~1~|~2~|~02/S5K~|~Small City funded scope for roadway reconstruction 112816~|~1~|~4~|~04/STR~|~Minor bridge rehab 10' to 20' span. 112816~|~1~|~2~|~02/STR~|~Resurfacing. 112816~|~1~|~1~|~01/S5K~|~Resurfacing. 112816~|~1~|~3~|~03/S5K~|~Minor bridge rehab 10' to 20' span. 88315~|~1~|~1~|~01/CMQ~|~ Project involves the widening of Grange Hall Road to three (3) lanes, including the construction of a widened shoulder, bikeway, curb and storm sewer. Project will meet the existing three (3) lane pavement section just south of Gardenview Drive, and will terminate at Kemp Road in the City of Beavercreek 122691~|~1~|~1~|~01/CMQ~|~Plan split for signal upgrades utilizing CMAQ funding. 121542~|~1~|~1~|~01/S>2/YOUN~|~Resurfacing, urban paving in the city of Youngstown. 121542~|~1~|~2~|~02/S>2/CAMP~|~Resurfacing, urban paving in the city of Campbell. 110021~|~1~|~1~|~01/NHS~|~Pavement Plan split 93079~|~1~|~2~|~02/IMS~|~This Plan Split is for the pavement work inlcuded in the project. Work is on mainline I-74 and all ramps at the interchange. 93079~|~1~|~1~|~01/IMS~|~This plan split is for the replacement of bridge HAM-74-1466 (SFN 3108708) North Bend Road over I-74. This plan split includes the necessary pavement work on North Bend road needed when raising the bridge. 93079~|~1~|~3~|~03/IMS~|~Plan Split for Vandal Protection Fence and bronze plaques. ODOT funds are capped on the VPF. Green Twp to pay for anything over the ODOT Cap amount and for 100% of the cost for the bronze plaques. 93079~|~2~|~4~|~04/IMS~|~This plan split is for the slide repair at the Westbound offramp to North Bend Rd. (Part 2, associated to PID 101450). 105724~|~1~|~2~|~02/STR~|~Reconstruction of overhead flashers at US-6 & SR-46 and SR-7 & SR-84 105724~|~1~|~1~|~01/NHS~|~Installing signal at TRU SR 11SB and Tibbetts Wick Road. 113310~|~1~|~1~|~01/MPO~|~work eligible for federal-aide. 84478~|~1~|~1~|~01/NHS~|~Dsitrict Wide Pavement Preventative Maintenance project for FY2014 on CLE 125 from SLM 8.95 - 14.09 which is 100% NHS 101287~|~1~|~1~|~01/STR~|~WOO-64 97153~|~1~|~1~|~01/NFA~|~Stark County Engineer 109864~|~1~|~1~|~01/STR~|~Overlay in ADA 117881~|~1~|~1~|~01/IMS~|~Split for work funded with Major Rehab 117881~|~1~|~2~|~02/IMS~|~Plan split for bridge work within corridor 111590~|~1~|~1~|~01/NHS~|~Federally eligible items. 106928~|~1~|~1~|~01/IMS~|~Project is to remove and replace the damaged acrylic noise wall panels along I-75 in Dayton. Panels were damaged as a result of an accident and ensuing fire. 117816~|~1~|~1~|~01/NFP/GPHC~|~Resurfacing with partial and full depth replacement of park drives and parking areas in Embshoff Woods Park. 117816~|~1~|~2~|~02/NFA~|~this is a plan split to cover the sidewalk which can not be paid using Metropark funding 82286~|~1~|~3~|~03/IMS~|~Plan Splt for MSD work included with the project. All items are 100% MSD. 82286~|~1~|~2~|~02/NHS~|~Phase 7 of the HAM-75 Corridor Projects. Reconstruct I-75 from north of the Mitchell Avenue interchange through the SR 562 interchange. The SR 562 ramps servicing SB I-75 shall be reconstructed. Mainline work should end north of Bridge No. HAM-75-0791 carrying I-75 over the I-75SB to SR 562 EB Ramp. 82286~|~1~|~1~|~01/IMS~|~Phase 7 of the HAM-75 Corridor Projects. Reconstruct I-75 from 0.4 miles north of the Mitchell Avenue interchange through the SR 562 interchange. The SR 562 ramps servicing SB I-75 shall be reconstructed. Mainline work should end north of Bridge No. HAM-75-0791 carrying I-75 over the I-75SB to SR 562 EB Ramp. 112650~|~1~|~1~|~01/IMS~|~Repair culvert carrying IR 70 over Post Boy Creek by field paving the invert. 110433~|~1~|~1~|~01/S>2~|~Resurfacing of Applegrove St from Marquardt Ave to Market Ave (SR 43). 87026~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping. 109091~|~1~|~1~|~01/SAF~|~Implementation of multiple pedestrian related improvements identified in the City of Eaton Community Schools School Travel Plan including construction of curb bump outs, installation of new signage, and application of high visibility crosswalk markings. 116950~|~1~|~1~|~01/IMS~|~WOO-75 pavement split 97722~|~1~|~1~|~01/BRO~|~Structure over Scioto River replacement 76335~|~1~|~3~|~03/S>2~|~Resurfacing of United States Route 30 from SLM 18.75 to SLM 19.16, in the City of Canton. 76335~|~1~|~1~|~01/NHS~|~Resurfacing of United States Route 30 from SLM 16.46 to SLM 18.48, in the City of Canton. 76335~|~1~|~4~|~04/NHS~|~Minor bridge work to the following sfn: 7601069, 7603673, 7603681, 7601077, 7603738, 7603746. 76335~|~1~|~2~|~02/IMS~|~Resurfacing of United State Route 30 from SLM 18.48 to SLM 18.75, in the City of Canton. 103853~|~1~|~1~|~01/ENH~|~Multi-use path trailhead, pavilion and parking for Gasholder Building. 116946~|~1~|~1~|~01/NHS~|~Major Bridge Rehabilitation 116946~|~1~|~2~|~02/NHS~|~Costs for the Upgrading the existing luminaries to LED on the for the bridge traffic lighting which is owned by the City of Lorain. 116359~|~1~|~1~|~01/SAF~|~Construct roundabout at intersection of FRA SR 665 and Lambert Rd (FRA CR 291) 100737~|~1~|~1~|~01/IMS~|~Spot concrete slab repair on interstate system. 100737~|~1~|~2~|~02/STR~|~Spot repair on MAD 42 from 12.35 to 13.43 110698~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 20' span. 110698~|~1~|~1~|~01/IMS~|~Resurfacing. 110698~|~1~|~2~|~02/NHS/TWIN~|~Resurfacing, urban paving in the City of Twinsburg. 110698~|~1~|~4~|~04/NHS/TWIN~|~100% Twinsburg items including partial depth repairs, manholes and catch basins reconstructed to grade. 110698~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 115895~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 115895~|~1~|~2~|~02/BRO~|~Plan split for work to address scour countermeasures and utilize Protect funds 104925~|~1~|~1~|~01/NFA~|~Norfolk Southern Anti-idle project 122106~|~1~|~1~|~01/NFA/GUE~|~Guernsey County CEAO Federal/State Exchange Program Funding - 4C87 (80% State) / LNTP (20% Local Match) - Replacement of SFN 3034968 carrying over Leatherwood Creek 111517~|~1~|~1~|~01/IMS~|~Slope repair adjacent to the WB rest area 107358~|~1~|~1~|~01/STR~|~Culvert replacement. Locations TBD. 119141~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 18.70-25.39 and MEG 33 0.00-4.09. Funded 100% State. 119141~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 18.70-25.39 and MEG 33 0.00-4.09. Work on the existing lanes. 119141~|~1~|~3~|~03/NHS~|~Construction of 2 new overpass bridges on ATH 33. 100577~|~1~|~1~|~01/BRO~|~Replace existing box culvert bridge carrying SR 14 over Branch of Stone Mill Run. 119232~|~1~|~1~|~01/S>2~|~Plan Split for guardrail work/repair in D8 104829~|~1~|~1~|~01/S>2~|~Trail maintenance throughout the City of Springfield. 84717~|~1~|~1~|~01/STR~|~Overlay US 42 and SR 41 in Clark County; Village of South Charleston:CLA US 42 SLM 5.26 to 6.29CLA SR 41 SLM 3.63 to 4.99 121375~|~1~|~1~|~01/NFP~|~FY30 Design Holder 116854~|~1~|~1~|~01/CMQ~|~Intersection improvement. 100367~|~1~|~1~|~01/NHS~|~This split is for resurfacing with federal NHS funds with a 20% State match. All funds are from the District Preservation Program. There are no local funds in this split. 100367~|~1~|~2~|~02/S<2~|~This split is for resurfacing with federal STP funds in the Ottawa-Glandorf urban area using funds from the District preservation program. There is a 20% state match. There are no local funds in this split. 100367~|~1~|~3~|~03/STR~|~This split is for resurfacing with rural federal STP funds with a 20% State match. All funds are from the District Preservation Program. There are no local funds in this split. 108498~|~1~|~1~|~01/MPO/NORT~|~Resurfacing of Wooster Rd from SR 21 to Norton East Corp Limit. 100013~|~1~|~1~|~01/IMS~|~100% state funded split for pavement work 100101~|~1~|~1~|~01/NFP~|~Split for lighting work. 122023~|~1~|~1~|~01/S5K/GAMB~|~Multimodal safety improvements in the Village of Gambier. 119727~|~1~|~1~|~01/IMS~|~Geotech Repairs along RIC IR 0071 15.79. 109237~|~1~|~1~|~01/STR~|~Culvert Replacement 114109~|~1~|~1~|~01/ENH~|~RCRPC funded sidewalk project in the Village of Bellville 114109~|~1~|~2~|~02/ENH~|~On-Going Services (KEM) 99804~|~1~|~1~|~01/CMQ~|~Construction of Phase 4 of the Western Reserve Greenway Bike Trail in Trumbull County, Ohio. 117575~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items 121310~|~1~|~1~|~01/NHS~|~added plan split. 121310~|~1~|~2~|~02/NHS~|~local plan split. 105291~|~1~|~1~|~01/STR~|~Resurfacing JEF-164 118922~|~1~|~1~|~01/S>2~|~conduit linked 118922~|~1~|~2~|~02/NHS~|~conduit linked 101209~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split 1 created for the following STP Rural routes: MRW-97-0.00-5.94 MRW-288-0.00-6.82 101209~|~2~|~2~|~02/IMS~|~CO CO Contr 02 plan split 2 created for the following Interstate routes: MRW-71-19.53-19.92 105557~|~1~|~1~|~01/NHS~|~FRA-317 105557~|~1~|~2~|~02/S>2~|~DEL-745 86724~|~1~|~1~|~01/STR~|~Resurfacing 86724~|~1~|~2~|~02/STR~|~Bridge Repairs 90251~|~1~|~1~|~01/NFA~|~HIG TR 250/Various GR 2013On TR250 from 0.00 to 2.02, it is proposed to replace the guardrail at various location.CEAO 100% safety funds01/NFA/OT/HIG 120379~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 103852~|~1~|~1~|~01/STR~|~Permanent repair of slip on PIK CR50 1.95 (DSR# PIK-001) 109913~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded. 98307~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair in Franklin County 103989~|~1~|~1~|~01/ENH~|~Construction of sidewalk along GAL 325 6.68-6.87 in the Village of Rio Grande. Total length of project 0.18 miles. Funded 80% federal, 15% credit bridge, 5% local. 100425~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 1.56-3.68. Rural other federal aid funded 80 federal/20 state. 100425~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 0.60-1.56. Urban other federal aid funded 80 federal/20 state. 101429~|~1~|~1~|~01/STR~|~STP Rural Chip Seal 114830~|~1~|~1~|~01/NHS~|~DEL-23 from 14.37 to 17.75 124366~|~1~|~1~|~01/SAE~|~Install new signal. 97392~|~1~|~2~|~02/S<2~|~Culvert replacement project. HOC 216 0.00. Urban other federal aid funded 80 federal/20 state. 97392~|~1~|~1~|~01/NHS~|~Culvert replacement project. HOC 78 3.20. NHS route funded 80 federal/20 state. 112756~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing of S Chestnut St from Lake Ave to Main St and Riddle St from Meridian St to Liberty St, in the City of Ravenna. 105334~|~1~|~2~|~02/S<2~|~AC overlay without repairs on Small Urban route: SHE SR 29 SLM 20.35 to 20.95. 105334~|~1~|~1~|~01/STR~|~AC overlay without repairs on rural route: AUG SR 29 SLM 9.67 to 10.95 96486~|~1~|~1~|~01/NFP~|~Split 88961~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3000451 GUE US22 20.9 Intersect: Us 22 Over Ditch; BR Eligible for Replacement: Length=23 SD/FO(1) SR=45.3 DSR=6 88961~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation - 4PS7 (100% State) - No CAP - Relocation of TR 6756 from the 00.00 to th 00.02 to improve site safety at the location. 124359~|~1~|~1~|~01/IMS~|~Plan split for all work on project 117562~|~1~|~1~|~01/SAF/GCEO~|~Construction of a roundabout at the intersection of Fairground Road (CR-20) and Hilltop Road (TR-73). 103821~|~1~|~1~|~01/SAF~|~Work eligible for Highway Safety funding to improve the safety and traffic flow thru the interchange. 103821~|~1~|~2~|~02/SAF~|~Work items that is eligible for Active Transportation Infrastructure funding sponsored by the City of Cleveland. 99590~|~1~|~2~|~02/IMS~|~IM funding for 2 structures (not BR eligible) SFN 2402009 FAY-35-3.64 L over IR 71 SFN 2401991 FAY-35-3.64 R over IR 71 99590~|~1~|~1~|~01/NHS~|~Repair and structural overlay of FAY US 35 99590~|~2~|~3~|~03/STR~|~Resurfacing CR 38A from Washington CH corp line to SR 238 121930~|~1~|~1~|~01/SAF/ASD~|~Install 1 mile of 6? sidewalk on the north side and 11? Shared Use Path on the south side of US-250 from Sugarbush Dr. to CR-1575. 114659~|~1~|~1~|~01/IMS~|~Project to repair bridges HAM-275-0034 over US 50 and railroad, HAM-275-0312L/R over Whitewater River by drilling out-of-plane bending cracks and welding stiffeners to the girder flanges. The HAM-275-0034 bridges will also be painted. 116219~|~1~|~1~|~01/S<2~|~Planing and paving utilizing 4B97 Federal funds at 95% ($903,110 maximum). 122942~|~1~|~1~|~01/NFP~|~All bridge hit repair work included in this split. 119336~|~1~|~1~|~01/IMS~|~Plan Split for Priority Spot Repairs 115980~|~1~|~1~|~01/MPO~|~Widen TR 179 Logan County Jefferson TWP by two feet 101189~|~1~|~1~|~01/BRO~|~All work to replace this bridge deck is in this split. Federal and state funds from the District Preservation Program Budget. 99708~|~1~|~1~|~01/NHS~|~Repair collision damage to bridge BUT-27-0080R bridge that carries US 27 over SR 128. Repair will involve heat straightening, painting, crossframe replacement and sign replacements. 89245~|~1~|~5~|~05/S<2~|~"05/S<2/OT/ " = District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on LIC SR 79 16.25-16.87 89245~|~1~|~6~|~06/STR~|~"06/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markings on LIC SR79 16.87-33.1 89245~|~1~|~4~|~04/S<2/NEWA~|~"04/S<2/PV/NEWA" - Local Funding 4BG7(100% City of Newark) - No CAP - Resurfacing on LIC CR805 0-0.11 and any 100% items requested by the City of Newark 89245~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " = District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on LIC SR79 16.25-16.87 89245~|~1~|~3~|~03/S<2/NEWA~|~"03/S<2/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving on LIC SR79 15.66-16.25 89245~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on LIC SR79 16.87-33.1 89245~|~1~|~7~|~07/S<2/NEWA~|~"07/S<2/OT/NEWA" - District Preservation Marking Pavements 4MP7(80% State) / 4BG7(20% Local) - No CAP - Striping and Raised Pavement Markings for the Urban Paving on LIC SR79 15.66-16.25 115774~|~1~|~1~|~01/S5K/KENT~|~Full depth reconstruction. 95% federal funds from the Small City Program until the cap is reached. The non-federal match and any funds needed after the cap is reached will be provided by the City of Kenton. 115774~|~1~|~2~|~02/S5K~|~Paving of surfacing course. The 20% federal funds will come from the District Preservation Program budget. The 20% match will be provided by the City of Kenton. 115774~|~1~|~3~|~03/ENH~|~TAP funding for sidewalk work. Funding is 95% federal funds through the use of Toll Revenue Credit (TRC). The match to be provided by the City of Kenton. 115774~|~1~|~4~|~04/NFA~|~City utilities including waterline work. Paid with 100% city funds. 93296~|~1~|~1~|~01/MPO~|~80% federal /20% local split using MPO STP funds. 114214~|~1~|~1~|~01/CMQ~|~Construction of a shared use path along US 42 from Reading Road to E. Kemper Road. 114214~|~1~|~2~|~02/MPO~|~100% locally funded plan split for a change order to add concrete bus pads, requested by the City of Sharonville during construction. 117980~|~1~|~1~|~01/BRF/CCEO~|~Replacement of COS TR 252 0.01 (SFN 1631829) 93179~|~1~|~1~|~01/STR~|~General system paving in the rural func class area:DEL-229: 0-0.12MAR-229: 0-1.05MAR-47: 0.62-2.09MAR-4: 0-7.93 93179~|~1~|~3~|~03/STR~|~STP Rural bridge deck overlay 100% state MAD-4-1.79 over Patton Run 93179~|~1~|~2~|~02/S<2~|~Generaly system paving in the urban func class area:MAR-4: 7.93-10.01 120332~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 112964~|~1~|~1~|~01/IMS~|~FRA-270 from 0.00 to 0.63 and 9.62 to 17.10 93600~|~1~|~1~|~01/IMS~|~Replace structures SFN 1204416 CLA 70 1325 L and SFN 1204238 CLA 70 1101 R 87799~|~1~|~2~|~02/NHS~|~80/20 fed/state split for culvert work. 87799~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all pavement work using federal NH funds. 107274~|~1~|~1~|~01/NFA~|~Resurfacing of Boston Mills road. 114397~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 103693~|~1~|~1~|~01/NFA~|~The City of Northwood is proposing several U-Turn improvements on Oregon Road at Wales and Arbor roads along with pavement upgrades to Oregon Road. The project starts at the intersection of Wales and Oregon continuing south to 200 feet south of Caple Blvd. a total distance of about 3200 feet. 108156~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAD-38-12.61-13.47 MAD-42-7.11-9.16 108156~|~1~|~2~|~02/S5K~|~STP 5000 Plan Split 108156~|~1~|~3~|~03/SAF~|~Install crosswalk, RRFB, and lighting at the intersection of SR 38 and High Street NE in the Village of Plumwood 109410~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers 88943~|~1~|~1~|~01/S>2/Cols~|~Urban paving in the City of Columbus. FRA-33-20.69 to 21.91 88943~|~1~|~2~|~02/NHS~|~Priority system paving of FRA-33: 21.91-24.26 124987~|~1~|~1~|~01/ENH~|~MPO TAP Funding 106877~|~1~|~1~|~01/NHS~|~Construct noise wall along SR 315 106877~|~1~|~2~|~02/NHS~|~Relocation of DMS sign 106877~|~2~|~3~|~03/IMS~|~Repair of noise walls on MAD-70, FRA-71, FRA-270, FRA-670 106877~|~2~|~4~|~04/NHS~|~Noise wall repair on DEL-42 109804~|~1~|~1~|~01/STR~|~Resurfacing on SR 309 outside of the Kenton Urban Area using district preservation funds (4PF7 - 80% and 4PS7 - 20%). From Kenton Urban Area Boundary at 18.44 to the County Line. 109804~|~1~|~2~|~02/S<2~|~Resurfacing on SR 309 inside of the Kenton Urban Area but outside of the City of Kenton using district preservation funds (4PF7 - 80% and 4PS7 - 20%). From CR 171 at 16.93 to the Kenton Urban Area Boundary at 18.44. 116749~|~1~|~2~|~02/STR~|~Bridge preventive maintenance. 116749~|~1~|~1~|~01/STR~|~Resurfacing, includes paving over 3 bridges 10' to 20' span. 116547~|~1~|~1~|~01/MPO/GRNT~|~Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads. 116547~|~1~|~2~|~02/NFP~|~resurfacing of roadway north of Bridgetown to the roundabout limits 105255~|~1~|~1~|~01/STR~|~Resurfacing of BEL-9 from SLM 0.00 to 13.60 105255~|~1~|~2~|~02/S<2~|~Resurfacing SR 9 from SLM 13.60 to SLM 14.60 86691~|~1~|~1~|~01/STR~|~Preventive Maintenance Smoothseal 116003~|~1~|~1~|~01/SAF~|~HSIP funding 4HB7 79991~|~2~|~2~|~02/IMS~|~4805259 LUC SR51 8.46 Intersect: Ir 475 79991~|~1~|~1~|~01/BRO~|~4808282 LUC IR475 14.18 Intersect: Bowen Road 4808312 LUC IR475 14.34 Intersect: Rushland Ave 79991~|~1~|~3~|~03/NHS~|~Split for additional work to complete intersections on ends of Rushland and Bowen bridges. Requested work from the City.; 50% will be City funded and 50% will be District alloc. @ 80/20 102017~|~1~|~1~|~01/IMS~|~Mine remediation underneath IR 680 at SLM 14.50 Ramp J and SLM 15.60 mainline. 84105~|~1~|~1~|~01/NFA~|~"01/NFA/OT/FAIR" Fairfield County Metro park project. 107503~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7 119998~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 90901~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds 121911~|~1~|~1~|~01/ERD/CANT~|~Streetscape project. 123782~|~1~|~1~|~01/NHS~|~NHS 107937~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 11.65-11.69. DSR MOE-009. Rural other federal aid funded 80% federal/20 % state. 112062~|~1~|~1~|~01/NFP~|~Funds for SR 101 reconstruction and sewer on US 20. 110613~|~1~|~1~|~01/NHS~|~Split for paving on the NHS 112748~|~1~|~1~|~01/S>2~|~Resurfacing. 112748~|~1~|~5~|~05/S>2/LOUI~|~Full and partial depth repairs in the City of Louisville. 112748~|~1~|~4~|~04/S>2/CANT~|~Full and partial depth repairs in the City of Canton. 112748~|~1~|~2~|~02/S>2/CANT~|~Resurfacing, urban paving in the City of Canton. Priority 1 funding event 20% local portion, Priority 2 funding event 80% D04. 112748~|~1~|~3~|~03/S>2/LOUI~|~Resurfacing, urban paving in the City of Louisville. Priority 1 funding event 20% local portion, Priority 2 funding event 80% D04. 112748~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 119187~|~1~|~1~|~01/IMS~|~Drainage block PID. 100836~|~1~|~1~|~01/S>2~|~Culvert repair on urban route. 100836~|~1~|~2~|~02/NFA~|~Culvert repair on non-Federal Aid Route. 100836~|~1~|~3~|~03/STR~|~Culvert repair on rural routes. 100836~|~1~|~4~|~04/IMS~|~Culvert repair on Interstate route. 122427~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 94579~|~1~|~1~|~01/NFP~|~Tuckpointing/Misc Brick Work at District Office complex 91866~|~2~|~1~|~01/IMS~|~Replace the existing superstructure on the twin bridges at SLM 5.92 (BEL-70-0592 L & R, SFN 0702072, 0702110) with a new continuous prestressed concrete I-beam superstructure on existing substructure, and widen bridges by building new bridge sections to accomodate two lanes of traffic in each direction for MOT. Minor substructure repairs required. 95075~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $256,000 - Rock Scaling at LIC-IR70-19.86EB/19.88WB 95075~|~3~|~3~|~03/S>2~|~"03/S>2/OT/" - Geological Site Management 4SF7 (80% fed) / 4SS7 (20% state) Rock scaling at CUY-17-15.30 95075~|~2~|~2~|~02/IMS~|~"02/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $265,000 - Rockfall Barrier Installation at LIC-IR70-21.44 106331~|~1~|~2~|~02/NHS~|~Bridge Work:HUR-US-20 08.130 SFN 3900754 (OVER WEST BR HURON RIVER)Preventive Maintenance: ? Expansion joint repair/replacement (048) ? Deck Sealing (051) Reactive Maintenance: ? Conc patch(non-deck) (010) ? Deck patching(conc) (049) ? Exp jt repair/repl (048) 106331~|~1~|~1~|~01/NHS~|~Resurfacing HUR-20-7.35 to 10.76 106331~|~1~|~4~|~04/SAF~|~Safety agreed to fund the southern RRFB (up to $20k) at the park entrance due to the 45 MPH speed limit and the westbound vehicles coming off of a 60 MPH divided 4-lane section just a half mile prior. She will not be funding the northern RRFB. See attached email. 106331~|~1~|~3~|~03/SAF~|~Long line r-wr pavement markings 94460~|~1~|~1~|~01/SAF~|~Safety funding for Hilliard Rome improvements 110876~|~1~|~1~|~01/SAF~|~Extend US 30 WB right turn lane, add SR 57 right turn, and replace signal to include backplates. 90382~|~1~|~1~|~01/BRO~|~Fifth Ave bridge replacement over Scioto River using municipal bridge funds (4R87). Columbus is sponsor.SFN 2560771, 5th ave over Scioto River 90382~|~1~|~2~|~02/ENH~|~MORPC Enhancement funding (4TC7) to widen Fifth Ave deck and construct multi-use path from McKinley Ave to Dublin Rd. Columbus is sponsor. 109879~|~1~|~1~|~01/STR~|~2022 chip 106849~|~1~|~1~|~01/IMS~|~Construction of Noise Wall on the North side of IR76 just East of State Route 534 in Mahoning County, Ohio. 96956~|~1~|~1~|~01/BRF~|~Split for the replacement of the North Main Street bridge (SFN 1832581) over the Chagrin River. 96956~|~1~|~2~|~02/NFA~|~The work is for non-eligible items at 100% local cost. 106931~|~1~|~2~|~02/IMS~|~Plan split for noise wall on I-475 106931~|~1~|~1~|~01/NHS~|~Plan Split for noise wall on US 23 98292~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP ? deck replacement and other repairs on 1) 6002439 MUS-70-2.99 Intersect: CR 28; Not BR Eligible for Rehabilitation: Length=120 SD/FO(0) SR=89.3 DSR=7; 2) 6002439 MUS-70-2.99 Intersect: CR 28; Not BR Eligible for Rehabilitation: Length=139 SD/FO(0) SR=89.3 DSR=7 100017~|~1~|~1~|~01/MPO~|~Sidewalk on West side of Didion 114356~|~1~|~1~|~01/IMS~|~plan split for landslide corrections along HAM IR 275 97545~|~1~|~3~|~03/BRF~|~Ohio Bridge Partnership Program. SFN 5237211, Grafton Road 97545~|~1~|~2~|~02/BRF~|~Ohio Bridge Partnership Program. SFN 5233836, Weymouth Road 97545~|~1~|~1~|~01/BRO~|~Ohio Bridge Partnership Program. SFN 5239125, Muntz Road 96459~|~1~|~1~|~01/STR~|~SFN 1900722 DAR-47-1889 place new wearing surface of non-composite box beams with latex modified concrete hard overlay. 96459~|~1~|~2~|~02/NHS~|~SFN 1901095, DAR-49-1181 place new wearing surface of non-composite box beams with latex modified concrete hard overlay. 96459~|~1~|~3~|~03/NFA~|~SFN1904426, DAR-722-0996 place new wearing surface of non-composite box beams with latex modified concrete hard overlay. 81632~|~1~|~2~|~02/IMS~|~Minor bridge work to the linked structures. 81632~|~1~|~1~|~01/IMS~|~Resurfacing SUM IR 77 from 28.37 to 33.62, Resurfacing of SR 21 and SR 176 ramps to and from IR 77. 123632~|~1~|~1~|~01/NHS~|~Plan Split for NHS 117222~|~1~|~1~|~01/NHS~|~Landslide repair project. MOE 7 7.51. GSM Funded. 93913~|~1~|~2~|~02/SAF/GAH~|~100% Gahanna items for non-reimbursable roadway items - brick pavers and conduit 93913~|~1~|~1~|~01/SAF~|~100% Safe Route to School funding up to project cap for Jefferson Path, Laura heil Extension, Cherrybottom and East Johnstown improvements01/SAF/OT/ 99231~|~1~|~1~|~01/STR~|~CR10, CR35 and CR61. 94598~|~1~|~1~|~01/STR~|~Rockfall hazard mediation. MOE 800 5.97-6.45. GSM Funds. Rural other federal aid funded 80 federal/20 state. 100978~|~1~|~1~|~01/S<2~|~District Preservation Pavement 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Paving on OFAH-Urban portions of US 36: 1) Kno-US 36-20.82 to 20.85; 100978~|~1~|~2~|~02/STR~|~District Preservation Pavement 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Paving on OFAH-Rural portions of US 36: 1) Kno-US 36-20.85 to 29.50; 2) Kno-US 36C-00.00 to 00.12; 116497~|~1~|~1~|~01/STR~|~Repair or Replace Culvert 115332~|~1~|~1~|~01/SAF~|~Construction of sidewalk and curbs in the Village of Racine. 115332~|~1~|~2~|~02/SAF~|~Reimbursement for signs that the local took into their possession. 100% Local. 85871~|~1~|~1~|~01/BRF/LANC~|~"01/BRF/BR/LANC" City of Lancaster bridge replacement on Columbus Road utilizing Municipal Bridge Funds Capped at $229,000 113467~|~1~|~1~|~01/S>2~|~Roadway milling and resurfacing and new striping in the City of Tipp City. 113157~|~1~|~1~|~01/NFP~|~The city of Lima will make street traffic calming and pedestrian safety improvements to the Health Education Corridor (Bellefontaine and Market Streets from I-75 west to North Jameson Ave. 114484~|~1~|~1~|~01/STR~|~Split for resurfacing work 92356~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment. install retaining wall to mitigate landslide. 110703~|~1~|~1~|~01/NHS~|~DEL-23 Priority Section Pavement Repairs 114472~|~1~|~1~|~01/STR~|~Resurfacing US 62 108886~|~1~|~1~|~01/NFP~|~TID will construct the Cleveland Massillon Road project 109842~|~1~|~2~|~02/STR~|~LAW 243 (11.59-15.23 / 16.17-17.48)LAW 378 (0.00-9.46) 109842~|~1~|~1~|~01/S<2~|~LAW 243 (15.23-16.17 / 17.48-18.39) 109842~|~1~|~3~|~03/STR~|~Bridge PM on LAW 378 4.84 109842~|~2~|~4~|~04/STR~|~LAW 378 2.25 Culvert 114202~|~1~|~1~|~01/NFA~|~Established Plan split for construction engineering task order. 100539~|~1~|~1~|~01/NFA~|~Chip sealing COL-164 from SLM 18.00 (TR 859) to SLM 23.10. 100539~|~1~|~2~|~02/S<2~|~Chip sealing COL-164 from SLM 23.10 to 24.31. 101087~|~1~|~1~|~01/NHS~|~Overlay US 33 in Logan County: LOG US SLM 1.97 to 6.57 103820~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate bridges. 97961~|~1~|~1~|~01/STR~|~SR 707 SLM 0.00 to SLM 11.29 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in) 117560~|~1~|~1~|~01/MPO~|~Plan split for intersection pedestrian crossing improvements eligible funded work. 93534~|~1~|~1~|~01/SAE~|~The project includes retrofitting the Galbraith at Plainfield Road traffic signal and replacement of the Plainfield Road at Matson traffic signal. The proposed signal work to include pedestrian signal heads with countdown heads. 105335~|~1~|~1~|~01/STR~|~Microsurfacing on rural route: MER US 127 SLM 19.42 to 23.08 120106~|~1~|~1~|~01/NFP~|~Resurfacing entire facility 84567~|~2~|~2~|~02/BRO~|~02/BRO/BR/ : District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No Cap - PART 2 of 2 - Replace deck on HAR-68-9.40 structure over the Scioto River (SFN 3300773). Functional Class is Principal Arterial. 84567~|~2~|~3~|~03/BRO~|~03/BRO/BR/ : District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No Cap - PART 2 of 2 - Replace 2 center box beams on HAR-67-13.13 bridge over Silver Creek (SFN 3300587). Functional Class is Major Collector. 84567~|~1~|~1~|~01/S<2~|~01/S<2/BR/ : District Preservation 4PF7(80% Federal) / 4PS7 (20% State) - No Cap - PART 1 of 2 - Deck overlay, etc. on HAR-31-11.23 over the Scioto River (SFN 3300366). Functional Class is Principal Arterial. 110067~|~1~|~1~|~01/NFP~|~Plans split for Lighting maintenance 102751~|~1~|~1~|~01/NHS~|~Resurfacing of NHS route 102751~|~1~|~2~|~02/STR~|~Resurfacing STP Rural route. 119494~|~1~|~1~|~01/NFP~|~Plan Split for repairing guardrail in all counties in District Six, besides Franklin County. 117135~|~1~|~1~|~01/SAF~|~Safety funded plan split 88566~|~1~|~1~|~01/IMS~|~resurface WOO IR75 0.00-5.03 - Hancock County line to to SR-25 (Cygnet) 110699~|~1~|~1~|~01/STR~|~All items of work on FRA-665. 94463~|~1~|~1~|~01/STR~|~Microsurfacing - LOR-82-5.13 to 10.06 / RIC-61-8.63 to 12.39 94463~|~1~|~2~|~02/NHS~|~Microsurfacing - MED-18-16.52 to 21.13 (rumble strip work only from 16.00 to 16.52. 94463~|~1~|~3~|~03/S<2~|~Microsurfacing - RIC-61-7.68 to 8.63 / 12.39 to 13.17 110088~|~1~|~1~|~01/IMS~|~Culver repair/replace on IR routes. 110088~|~1~|~2~|~02/NFA~|~CFN1808775 linked to Not on Federal Aid System 119606~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing of SR 41 and SR 323. 119606~|~1~|~2~|~02/NFA~|~All items of work associated with the resurfacing of SR 187 124728~|~1~|~1~|~01/ENH~|~Shared use path utilizing 100% Federal funds (TAP and Safety) up to Federal maximum. 116420~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district. 105451~|~1~|~1~|~01/STR~|~Plan Split 1 for resurfacing 105451~|~1~|~2~|~02/S<2~|~Pavement Work 105451~|~1~|~3~|~03/STR~|~Bridge Repair 100042~|~1~|~1~|~01/STR~|~Type A emergency slide repair. MOE 556 9.48. Rural other federal aid funded 100% Federal. 100042~|~1~|~2~|~02/STR~|~Type A emergency slide repair. MOE 556 9.48. Rural other federal aid funded 80% and 20% State. 91383~|~1~|~1~|~01/NHS~|~Remove existing overlay on bridge (COL-30-3543, SFN 1502360) and provide new MSC overlay. Spot painting of structural steel and repair of existing bridge parapets. 91383~|~1~|~2~|~02/NHS~|~The project includes the removal of the existing asphalt overlay on bridge COL-303543 (SFN 1502360) and replacing it with MSC overlay. The funding event is for on-going services to be provided by consultant during construction. 88953~|~1~|~1~|~01/BRO~|~IR76 11.48R SFN 7705972 intersected I76WB ramp to I77SB 88953~|~1~|~2~|~02/S>2~|~IR76 11.48R SFN 7706065 intersected I76EB off ramp over I76WB 105367~|~1~|~2~|~02/S<2~|~AC overlay without repairs on:MIA US 36 SLM 7.21 to 8.25 105367~|~1~|~1~|~01/STR~|~AC overlay without repairs on:MIA US 36 SLM 4.61 to 7.21MIA SR 48 SLM 16.88 to 19.40 115281~|~1~|~1~|~01/BRF~|~01/BRF/BR/ - 100% State (4PS7) - superstructure replacement on COS SR 751 4.21 (SFN 1602977) carrying SR 751 over Evans Creek 89731~|~1~|~1~|~01/NFA~|~Rehabilitate bridge BUT-1SP-0746 (Hueston Woods State Park Loop Road Drive over Four Mile Creek) and entails upgrading the rail, installing a new overlay, repairing the undermined approach slab, and repairing the undermined abutments. Also, rehabilitate the bridge size culvert GRE-001SP-0109 (John Bryan Park Rd. over a tributary to the Little Miami River) by reconstructing the stone headwalls as cast-in-place headwalls. 102904~|~1~|~1~|~01/MPO~|~Resurfacing of West Steel Coreners Road from Northampton Rd to State Rd in the City of Cuyahoga Falls. 108148~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: UNI-31-0.00-1.51 105802~|~1~|~1~|~01/IMS~|~Plan split for bridge painting work 105313~|~1~|~1~|~01/BRF~|~BRO CR 76 5.55 (SFN 0835137) bridge replacement. 115153~|~1~|~1~|~01/SAF~|~Plan split for RR crossing improvement 98283~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for Gue-70-2042L/R 94981~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 119369~|~1~|~1~|~01/SAF/CCEO~|~Reconstruct approximately 7340' of Farmers Road improving vertical curves as well as widening the pavement and berms and removing fixed objects from the clear zone. Work includes associated striping and resurfacing. 90919~|~1~|~1~|~01/STR~|~District Allocation 107915~|~1~|~1~|~01/NHS~|~NHS portions of DEL-36 Locations and associated bridges 107915~|~1~|~2~|~02/S>2~|~Urban Portions of Work Locations and associated bridges 107915~|~1~|~3~|~03/IMS~|~FRA-670 location and associated bridges 116569~|~1~|~1~|~01/NHS~|~Plan Split for bridge work 92740~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. GAL 141 17.00-17.06. 80% Federal and 20% State. 77917~|~1~|~2~|~02/STR~|~all work associated with bridge replacement. 77917~|~1~|~1~|~01/STR~|~all work associated with bridge replacement and should be funded 100% stp rural 121623~|~1~|~1~|~01/ENH~|~Plan Split for MPO TA funding 114945~|~1~|~1~|~01/S>2/MASS~|~Resurfacing, urban paving in the city of Massillon. 114945~|~1~|~2~|~02/S>2~|~Resurfacing. 114945~|~1~|~3~|~03/NHS~|~Resurfacing. 114945~|~1~|~4~|~04/NHS~|~Bridge preventative maintenance >20' span. 114945~|~1~|~5~|~05/S>2~|~Bridge preventative maintenance 10' to 20' span. 106094~|~1~|~1~|~01/STR~|~SCI 772 1.86 SCI-003 116068~|~1~|~1~|~01/SAE~|~Roundabout - 100% Fed Safety 93417~|~1~|~3~|~03/IMS~|~WOO-18-14.14 bridge (SR-18 over I-75) 93417~|~1~|~1~|~01/NHS/NBal~|~resurface Woo SR 18 11.58-14.1; resurface from Rocky Ford Bridge to I-75 93417~|~1~|~2~|~02/STR~|~resurface Woo SR 18 14.1 to 18.78; resurface from I-75 to Bloomdale west corp line. 98550~|~1~|~1~|~01/BRO~|~80% federal w/20% local matching funds for municipal bridge eligible work items. 123672~|~1~|~1~|~01/NHS~|~culvert split. 90868~|~1~|~1~|~01/S>2/PATA~|~"01/S>2/OT/PATA" - SRTS Sidewalk Project 4SC7 (100% Federal) - CAP $186,090.00 available for Construction Phase - SRTS project on Summit Road in the City of Pataskala Lic-CR 2-00.02 to 00.50 from Broad Street to Cleveland Road. 101035~|~1~|~1~|~01/STR~|~CO Inspection 10900~|~1~|~1~|~01/S>2~|~50/50 fed/local funding split for all pavement work on this project. 10900~|~1~|~2~|~02/S>2~|~80/20 fed/local funding split for all bridge work using county STP funds. 102928~|~1~|~1~|~01/NHS~|~NHS funds eligible. 121199~|~1~|~1~|~01/NHS~|~Urban paving 103815~|~1~|~1~|~01/BRF~|~Replacement of SFN 4931416 107041~|~1~|~1~|~01/S<2~|~Plans plsit 93676~|~1~|~1~|~01/STR~|~A slab culvert on HEN-65 @ SLM 10.04, No SFN assigned. 109695~|~1~|~1~|~01/NHS~|~Resurfacing TUS-36 105214~|~1~|~1~|~01/IMS~|~Plan split for resurfacing on HAM-71 113406~|~1~|~1~|~01/NHS~|~Geotech plan split to include erosion work as well as pavement repairs due to failures.Full depth and partial depth pavement repairs. Addition of curb along existing shoulders. Guardrail and drainage work at various locations. 106987~|~1~|~1~|~01/NFA~|~The County will construct improvements to the intersection of US 62 and CR 160 including the widening of the intersection, ventricle grade of CR160, and cul-de-sac on Vintage St. 113660~|~1~|~1~|~01/MPO~|~Resurfacing with pavement repair, addition of curb and gutter, replacement of storm sewer, addition of sidewalk and a shared use path on Broad Street from Central Avenue to Sandhill Road. 113660~|~1~|~2~|~02/ENH~|~Plan split for bike/ped infrastructure improvements included within this project. 88736~|~1~|~1~|~01/STR~|~Polyester pavement markers on CLA SR 56 from SLM 0.00 to 4.02 CHP on SR 55 from SLM 0.00 to 11.70 and on AUG SR 66 from 1.00 to 0.25. 107894~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 313 0.67-0.71. DSR NOB-002. Rural other federal aid funded 80% federal/20% state. 97305~|~1~|~1~|~01/SAE~|~Replacement and Installation of approximately 12,000 linear feet of guardrail along various county roads in Clermont County. 12056~|~1~|~1~|~01/STR~|~Brdg replacement. 0.40 MI. south of N&W Railroad. 6603033 PIK SR335 21.26 Intersect: Trib Of Wilson Run80 Fed/20 State. 01/STR/BR/State 121027~|~1~|~1~|~01/BRO/HUR~|~Replacement of SFN 3931781 121027~|~1~|~2~|~02/BRO/HUR~|~CE for the replacement of SFN 3931781 108637~|~1~|~1~|~01/SAF~|~Convert side-street stop condition to modern roundabout on Beckett Ridge Blvd at Lesourdsville West Chester Rd 105534~|~1~|~3~|~03/STR~|~Items to be paid 100% by the Village of Cardington including OPWC funds 105534~|~1~|~1~|~01/STR~|~AC Overlay with Repairs:MRW-229-3.11-3.20, MRW-229-4.00-5.43AC Overlay without Repairs:MRW-529-0.00-8.31 105534~|~1~|~2~|~02/STR~|~MRW-529-1.51 (5903483) and MRW-529-2.46 (5903513) SDC deck overlay using hydrodemolition 117567~|~1~|~1~|~01/S>2~|~Widening of SR-48 85233~|~1~|~2~|~02/SAE~|~Plan Split for the non-reimbursable utility (water work) in the project. 85233~|~1~|~1~|~01/SAE~|~Constructing a left turn lane westbound from sr125 to sr132 105200~|~1~|~3~|~03/SAF~|~Centerline rumble stripes. 105200~|~1~|~1~|~01/STR~|~Resurfacing on the Rural sections of the project.GRE-42 SLM 12.01 to 17.46 105200~|~1~|~2~|~02/S>2~|~Resurfacing on the urban sections of the project: GRE-42 SLM 11.26 to 12.01 99493~|~1~|~1~|~01/NFP~|~Mowing 98986~|~1~|~1~|~01/NHS~|~AUG US 33 16.73 to AUG US 33 16.88 convert the intersection of US 33 and Wapak-Fisher Road to an offset "T" intersection to improve safety at the intersection. 117266~|~1~|~1~|~01/NFP~|~Added a split 118465~|~1~|~1~|~01/SAF~|~The project includes the EB and WB US 33 Ramp intersections. The Chauncey cutoff (at grade intersection) will be closed. Safety project to convert a stop-controlled intersection and a signal-controlled intersection into modern roundabouts. 7311~|~1~|~1~|~01/MPO~|~turn Tower Blvd into a 4 lane road 122214~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-80-C 120675~|~1~|~1~|~01/SAE~|~Construct new roundabout on US 224 and SR 225. 116443~|~1~|~1~|~01/NFP~|~Districtwide raised pavement marking installation/maintenance. 109543~|~1~|~1~|~01/NFP~|~Construction of a new salt storage building in Gallia County GAL21. 117683~|~1~|~1~|~01/MPO~|~Plan Split for MPO Enhancements funds 123734~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance. 123734~|~1~|~2~|~02/NHS~|~Bridge preventative Maintenance. 123734~|~1~|~3~|~03/S>2~|~Bridge preventive maintenance. 123734~|~1~|~4~|~04/STR~|~Bridge preventive maintenance. 123769~|~1~|~1~|~01/BRO~|~Bridge Painting 90465~|~1~|~2~|~02/ENH/CANT~|~Streetscaping enhancements. 90465~|~1~|~1~|~01/MPO/CANT~|~The re-alignment and reconstruction of 11th street to improve geometrics between Market Street to West of Cherry Avenue, includes new roundabout at Market St and resurfacing a portion of Cherry St and 11st/SR 43 in the City of Canton. 83014~|~1~|~1~|~01/STR~|~Two replacement bridges. 0102857 ADA SR125 0.41 Intersect: Sacremento Run0102881 ADA SR125 0.48 Intersect: Kirker Hollow StreamOn SR125, 0.95 mile east of the Brown County Line, it is proposed to replace two structures. SFN 0102857 & 0102881.SFN 0102881 is eligible for BR funds but only for rehab, not replace.80 fed/20 state.01/STR/BR/State 105747~|~1~|~1~|~01/STR~|~Plan split for resurfacing work 112226~|~1~|~1~|~01/NFP~|~D09 Auxiliary Markings (A) FY2026 98731~|~1~|~1~|~01/NFP~|~Turnpike Mitigation funds - Drainage 119049~|~1~|~1~|~01/SAF~|~Intersection improvement of State Route 161 at Olentangy River Road. 124591~|~1~|~1~|~01/S>2~|~Major rehab of SR 3 from 1.650 to 5.398 124591~|~1~|~2~|~02/S5K~|~Major rehab of SR 3 from Plumb Rd to the Sunbury corporation line 117565~|~1~|~1~|~01/SAF~|~ODOT-Let - Safe Routes to School project - Safety funded 4HJ7 112407~|~1~|~1~|~01/SAF~|~Various pedestrian safety improvements 101817~|~1~|~1~|~01/IMS~|~Replace superstructure on two bridges, TUS-77 3343 (SFN 7903871) and TUS-77-3343 (SFN 7903901). 102546~|~1~|~1~|~01/NHS~|~plan split for work on the NHS section:CLE-32: SLM 13.70-16.44 121516~|~1~|~1~|~01/SAF~|~Lighting replacement 106378~|~1~|~1~|~01/BRF~|~Bridge replacement of E. 75th Street over Morgana Trail 106378~|~1~|~3~|~03/BRF~|~Plan split for First Energy utility work. 106378~|~1~|~4~|~04/BRF~|~Plan split for Dominion Energy Ohio utility work. 106378~|~1~|~6~|~06/BRF~|~Plan split for Crown Castle utility work. 106378~|~1~|~2~|~02/BRF~|~Plan split for AT&T OHIO utility work has been removed from the project. 106378~|~1~|~5~|~05/BRF~|~Plan split for Verizon utility work has been removed from the project. 106378~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment 102367~|~1~|~1~|~01/S<2~|~Asphalt resurfacing from SLM 12.97 to 14.84 102367~|~1~|~2~|~02/STR~|~Asphalt resurfacing from SLM 14.84 to 14.98 110725~|~1~|~1~|~01/STR~|~Slide Repair ROS-001 ROS CR 167 10.00 109289~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 12.62. 100% State ER funded. 115867~|~1~|~1~|~01/SAE~|~Guardrail project on various Richland County routes 98835~|~1~|~1~|~01/IMS~|~Split for pavement markings 121388~|~1~|~1~|~01/SAF~|~Plan split for traffic signals 113847~|~1~|~1~|~01/NFP~|~All work in this plan split. The local match and any funds needed after the CEAO Federal/State Exchange Program cap is reached will be provided by Allen County. 96430~|~1~|~1~|~01/SAF~|~Construction of sidewalk along Struthers Liberty Road, from Notre Dame Drive to Tenney Avenue. Also, along the South side of Tenney Avenue, in the City of Campbell, Mahoning County, Ohio. 84268~|~1~|~1~|~01/IMS~|~Replace superstructure on two Bridges, TUS-77-1785 L& R (SFNs 7902670, 7902646). Repair/Rehab substructure units and convert abutments to semi-integral. Raise bridge to obtain additional vertical clearance 98879~|~1~|~1~|~01/IMS~|~Split for bridge repair work 90638~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 108893~|~1~|~1~|~01/S>2~|~Upgrades to vehicle detection, signal cabinets, controllers, and communications equipment on various routes 111437~|~1~|~2~|~02/S<2~|~Bridge Work:(SFN 2229080) ERI-IR-80-05.090(NO WORK) (SFN 2229447) ERI-SR-13-02.920(ERI-IR-80-13.180)Preventive Maintenance: Expansion joint repair/replacement (048) (SFN 2202425) ERI-SR-13-06.520 (ERI-SR-2-18.230)Preventive Maintenance: Expansion joint repair/replacement (048) Reactive Maintenance: Exp jt repair/repl (048) (SFN 2202409) ERI-SR-13-03.670Reactive Maintenance:Exp jt repair/repl (048) (SFN 2202670) ERI-SR-99-00.960Preventive Maintenance: Expansion joint repair/replacement (048) Reactive Maintenance: Deck patching(conc) (049) Exp jt repair/repl (048) (SFN 2202794) ERI-SR-99-03.800Preventive Maintenance: Expansion joint repair/replacement (048) Reactive Maintenance: Exp jt repair/repl (048) 111437~|~1~|~3~|~03/SAF~|~Safety Funds for rumble stripes. 111437~|~1~|~4~|~04/SAF~|~Safety Funds for US-250/13 Radar. 111437~|~1~|~1~|~01/S<2~|~Fine Graded Polymer AC Overlay (Smoothseal) ERI-13-1.84 (US 250) to 6.92 (Huron Corp Limit) ERI-99-0.00 (Huron County Line) to 4.73 (SR 4) 100495~|~1~|~1~|~01/STR~|~Crack dealing various routes in District 11 87631~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Fast Dry Striping within District 5 on the OFAH-Rural Routes 87631~|~1~|~2~|~02/NHS~|~"02/NHS/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Fast Dry Striping within District 5 on the NHS System 87631~|~1~|~3~|~03/S<2~|~"03/S<2/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Fast Dry Striping within District 5 on the OFAH-Urban Routes 87631~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Fast Dry within District 5 on the NOFAS-Rural Routes 87631~|~1~|~5~|~05/IMS~|~"05/IMS/OT/ " - District Preservation - 4PF7 (90% Federal) / 4PS7 (10% State) - Annual contract for placement of Fast Dry Striping within District 5 on the Interstate Routes 93749~|~1~|~3~|~03/IMS~|~Plan Split to cover pavement markings. 93749~|~1~|~1~|~01/IMS~|~Resurfacing of IR76 from slm 11.44 to slm 11.80 and the resurfacing of IR77 from slm 15.18 to slm 17.20, in the City of Akron. 93749~|~1~|~2~|~02/IMS~|~Overlay of two structures. SFN# 7706006, SUM-IR76-11.50L and SFN# 7606030, SUM-IR76-11.52R. In the City of Akron, Summit County, Ohio. 98402~|~1~|~1~|~01/NHS~|~Crack sealing on NHS routes.BUT-SR 4 SLM 17.76 to 19.09BUT-SR 4 SLM 23.30 to 26.39BUT-SR 4 SLM 26.39 to 26.77WAR-US 42 SLM 16.57 to 17.95 98402~|~1~|~2~|~02/S>2~|~Crack sealing on Large Urban routes.BUT-US 42 SLM 0.00 to 3.33 98402~|~1~|~3~|~03/S<2~|~Crack sealing on Small Urban routes.BUT-SR 73 SLM 16.76 to 18.51 98402~|~1~|~4~|~04/STR~|~Crack sealing on rural routes.BUT-SR 122 SLM 3.86 to 5.74WAR-US 42 SLM 13.40 to 16.57 113119~|~1~|~1~|~01/NFP~|~Split for resurfacing work 94121~|~1~|~1~|~01/NHS/ADA~|~It is proposed to perform a deck overlay/ deck replacement project on the following structures: ADA-32-16.99L 0100331ADA-32-16.99R 0100366ADA-32-19.42L 0100420ADA-32-19.42R 0100455 89450~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Bridge replacement over Cross Creek; 0.70 miles south of CR74/CR28 intersection. 117701~|~1~|~1~|~01/STR~|~added plan split. 109330~|~1~|~1~|~01/NFA~|~ODNR Resurface and maintenance project in Maumee Bay State Park 90373~|~1~|~1~|~01/CMQ~|~US 62/224 Canield Signals 111129~|~1~|~1~|~01/S<2~|~Lighting project 111129~|~2~|~2~|~02/S<2~|~Adding a camera using TSMO funds. 100628~|~1~|~1~|~01/STR~|~Chip sealing TUS-93 from Sugarcreek to Dundee (SR 516). 102328~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span. 102328~|~1~|~1~|~01/NHS~|~Concrete pavement repairs. 102328~|~1~|~2~|~02/IMS~|~Replacing 4 westbound overhead signs on IR 80 leading to the Ohio Turnpike. 85311~|~1~|~1~|~01/BRF~|~Bridge relocation 106289~|~1~|~1~|~01/SAF~|~Install cable median barrier on I75 in SHE & AUG counties. 92747~|~1~|~3~|~03/SAF~|~Addition of turn lanes. 92747~|~1~|~2~|~02/NHS~|~Pavement resurfacing on WOO-20. 92747~|~1~|~4~|~04/NFP~|~Libbey Rd 92747~|~2~|~5~|~05/NHS~|~8701083 WOO US20 5.67 over Cedart Creek Trib8701148 WOO US20 7.61 Intersect: Henry Creek 92747~|~1~|~1~|~01/NHS~|~8701237 WOO-US20-10.51 92747~|~1~|~6~|~06/SAF~|~Safety above cap 87436~|~1~|~1~|~01/S<2~|~Culvert Replacement ERI-006-23.79 112045~|~1~|~1~|~01/NHS~|~All work in this project. 96647~|~1~|~2~|~02/NFP~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. WAS 530 0.00-7.86. Not on any federal route funded 100% state. 96647~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. MRG 83 0.00-7.48 and WAS 83 1.35-1.99. Rural other federal aid funded 80 federal/20 state. 108641~|~1~|~1~|~01/SAF~|~Stripe the outside shoulders to provide bike lanes on US Route 52 from Five Mile Road to Adamson Road. 106121~|~1~|~1~|~01/S>2~|~Recon to include new pavement, curb sidewalk, lights and catch basins in the City of Dayton on Salem Avenue Riverview to North. 106121~|~1~|~2~|~02/CMQ~|~CR 249 OM 038 This Project provides a two way bike path 109072~|~1~|~1~|~01/STR~|~Work on US 42 from S drive of Speedway Truck Stop (SLM 12.35) to the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81). Pavement and shoulder replacement for the existing width. 109072~|~1~|~4~|~04/NHS~|~Work on US 42 from the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81) to N drive of Pilot travel Center (SLM 13.43). Widening pavement to provide TWLT lane and widened shoulders. Minor ramp improvements at IR 70. 109072~|~1~|~2~|~02/STR~|~Work on US 42 from S drive of Speedway Truck Stop (SLM 12.35) to the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81). Widening pavement to provide TWLT lane and widened shoulders. Minor ramp improvements at IR 70. 109072~|~1~|~3~|~03/NHS~|~Work on US 42 from the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81) to N drive of Pilot Travel Center (SLM 13.43). Pavement and shoulder replacement for the existing width. 97172~|~1~|~1~|~01/IMS~|~SFN AUG-75-0545/0602159 - repair superstructure damaged by vehicle strike. Possible heat straightening, gouge repair and cross frame repairs. 117383~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 107719~|~1~|~1~|~01/STR~|~SFN 7202466. 121508~|~1~|~1~|~01/IMS~|~Concrete pavement repairs on CLE-275 121338~|~1~|~1~|~01/NHS~|~FRA SR 315 82934~|~1~|~3~|~03/S>2~|~100% City of Canton Sanitary costs. 82934~|~1~|~2~|~02/S>2~|~100% Dominion East Ohio utility costs. 82934~|~1~|~1~|~01/BRO~|~Rehab of sfn# 7600933, STA-172-15.57 over Branch of Nimishillen Creek. 110839~|~1~|~1~|~01/SAE~|~Safety funds split 117470~|~1~|~1~|~01/MPO/STCE~|~Resurfacing. 121068~|~1~|~1~|~01/NHS~|~Plan split for eligible rehabilitation work. 92112~|~1~|~1~|~01/IMS~|~LUC-75 103252~|~1~|~1~|~01/IMS~|~Overlay with repairs on Interstate route. 124004~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 117510~|~1~|~1~|~01/BRO~|~Plan split for bridge replacement. 117510~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 101627~|~1~|~1~|~01/S<2~|~STP <200,000 for AC Overlay without repairs on the following sections: FAY-22-10.47-10.98, PIC-104-15.68-16.62, PIC-104-20.70-21.47 101627~|~1~|~2~|~02/STR~|~STP Rural for AC Overlay without repairs on the following routes: FAY-22-10.98-17.62, PIC-104-10.44-15.68, PIC-104-16.62-20.70, PIC-22-0.00-0.20 98604~|~1~|~1~|~01/NFP~|~Plan split for pavement work throughout the project. 98604~|~1~|~2~|~02/NFA~|~Paving of the Unionville facility 94016~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 94016~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span. 94016~|~1~|~1~|~01/IMS~|~Resurfacing. 24841~|~1~|~1~|~01/BRO~|~Funding plan split to program project. Update after scope of work is known. 88034~|~1~|~1~|~01/SAF~|~Replace high pressure sodium light fixtures with LED light fixtures at the SR 32/SR133 interchange in Clermont County. 112183~|~1~|~1~|~01/STR~|~Chip sealing 94800~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 0.00 to 0.09 114983~|~1~|~1~|~01/IMS~|~Pavement Markings 18741~|~1~|~1~|~01/BRO~|~80/20 funding split for use with federal BR funds. 120364~|~1~|~1~|~01/NFP~|~Split for tree removal work 103156~|~1~|~1~|~01/NFA~|~The TID is constructing the Briarfield Blvd/Salisbury Road/Brandyway Lane Project including, but not limited to, roadwork improvements by realignment of the Briarfireld Blvd., Brandyway Lane, Salisbury Road intersection by extension of the Briarfield Blvd. north of Salisbury Road, extending east/west Brandy lane to the extended Briarfield Blvd., removal of existing north / south Brandyway Lane, extension of the existing westbound Salisbury Road to northbound Briarfield Blvd. left turn lane , revisions to optimize the Briarfield Blvd at Salisbury Road traffic signal, and other related roadway improvements. 98193~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS Mus-22-(01.16-07.95) 98193~|~1~|~2~|~02/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban Cos-83-(12.67-13.69) and Lic-79-(16.25-17.18) 98193~|~1~|~3~|~03/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routes Cos-83-(13.67-26.68), Cos-93-(12.01-22.67), Fai-158-(02.48-15.83), Fai-256-(14.10-24.63), Kno-62-(00.00-04.29), Lic-62-(17.49-20.64), Lic-158-(00.00-02.28), Mus-22-(00.00-01.16), Per-256-(00.00-00.16) 98193~|~1~|~4~|~04/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes Per-188-(00.00-04.48), Per-757-(00.00-05.68) 113730~|~1~|~1~|~01/SAF~|~Construct a mini roundabout at Ferris Road and Walford Street in Columbus. 124772~|~1~|~1~|~01/SAE~|~100% CEAO HSIP (4HB7) funded for eligible expenses 101941~|~1~|~1~|~01/NHS~|~Split for pavement replacement 101941~|~1~|~2~|~02/NFP~|~Retroactive fuel price adjustment 76745~|~1~|~1~|~01/IMS~|~100% UNFU funding 118923~|~1~|~1~|~01/S>2~|~conduit linked 118923~|~1~|~2~|~02/S>2~|~conduits linked 118923~|~1~|~3~|~03/NHS~|~conduit linked 121791~|~1~|~1~|~01/NFP~|~PM on various county routes. 110483~|~1~|~1~|~01/SAE~|~Project to upgrade the signal by installing mast arms, backplates, and advanced detection 110483~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 109627~|~1~|~1~|~01/NHS~|~Emergency repair on BRO 52 2.51 101426~|~1~|~1~|~01/NHS~|~Urban Paving 114932~|~1~|~1~|~01/STR~|~Resurfacing. 87783~|~1~|~1~|~01/ERD/Akrn~|~Install new traffic signalization equipment. Including: new poles, pedestrian signals, push buttons, street name signs, video cameras, emergency pre-emption, and fiber optic interconnect. 102662~|~1~|~1~|~01/STR~|~Landslide repair. 109200~|~1~|~1~|~01/STR~|~Slide repairROS 41 5.50 84381~|~1~|~1~|~01/NFP~|~2 year construction inspection project 121035~|~1~|~1~|~01/NFP~|~Guardrail work 90915~|~1~|~1~|~01/STR~|~District Allocation - 80/20 98140~|~1~|~2~|~02/STR~|~SCI 253 0.00 to 0.56 98140~|~1~|~3~|~03/NHS~|~SFN 7304757 98140~|~1~|~1~|~01/STR~|~Bridge Repair SFN 7304749 & 7304722 98140~|~1~|~4~|~04/STR~|~Lighting. 98140~|~1~|~5~|~05/NHS~|~Paving for ramps on US 52. 124121~|~1~|~1~|~01/NFP~|~Plan split for electrical maintenance work 112566~|~1~|~1~|~01/NFP~|~PM plan split 110700~|~1~|~1~|~01/S<2~|~Construction Inspection 110700~|~1~|~2~|~02/S<2~|~Construction Inspection 111007~|~1~|~1~|~01/SAF~|~Construct roundabout on POR SR 82 and Chamberlain. 111007~|~1~|~2~|~02/STR~|~Resurfacing POR SR 82 from 5.84 to 6.14. 111007~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 88521~|~1~|~1~|~01/STR~|~Resurface SEN SR19 0-6.07 92421~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds SAC 4PS7. 95707~|~1~|~2~|~02/NHS~|~Spot resurfacing and pavement repairs on COL-30 and JEF-22. 95707~|~1~|~1~|~01/STR~|~Spot resurfacing of various routes in District 11. 93488~|~1~|~1~|~01/NFP~|~Plan Split for 4MA7/facility funding for chiller replacement 101511~|~1~|~1~|~01/SAE~|~Installation of new and upgrade of substandard guardrail on various county roads in Clinton County. 89308~|~1~|~1~|~01/MPO~|~ Project includes widening of Liberty Fairfield Road from 0.28 miles N of SR-4 to 0.15 miles N of the Great Miami River to connect two previously federally funded projects that are complete at the north and south ends of the proposed improvements. Improvements include replacement of a bridge size CMP culvert with a concrete box culvert. 124808~|~1~|~1~|~01/IMS~|~Bridge work on various structures in District 5. 123056~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 116596~|~1~|~1~|~01/IMS~|~Interstate Plan Split 114219~|~1~|~1~|~01/NFP~|~Culvert repair and replacements. 110854~|~1~|~1~|~01/STR~|~Culvert liner project. MRG 266 2.73. 80% Federal and 20% State funds. 123552~|~1~|~1~|~01/BRF~|~Replacement of Bridge No CLE-CR 54-0016 (SFN: 1358030) which carries Glancy Corner Marathon Road over Pleasant Run. 100580~|~1~|~1~|~01/NFP~|~D09 GAP FY21 118508~|~1~|~1~|~01/NHS~|~Rockfall hazard remediation in the west bound lanes of MEG 33 7.61-7.73 and 7.87-7.94. 97680~|~1~|~1~|~01/STR~|~Minor Rehab SCI US 23 10.57-11.48 97680~|~1~|~2~|~02/SAE~|~Installing matrix stop bar detection on all approaches at Scioto Street. 107767~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades on MAH IR 680/Midlothian, TRU SR 5/82 at US 422, Perkins-Jones and Elm Road interchanges. 112374~|~1~|~1~|~01/BRO~|~Rehabilitate existing corrugated metal pipe carrying SR 149 over an unnamed tributary of McMahon Creek. 122558~|~1~|~1~|~01/NFP~|~Resurfacing in Zanesville State Nursery. 77930~|~1~|~1~|~01/S>2~|~Resurfacing a portion of US 42 in Hamilton County. 114147~|~1~|~1~|~01/SAF~|~ITS system maintenance throughout District 6 98701~|~1~|~1~|~01/MPO~|~Resurfacing Akron-Cleveland Rd (CR 16) from Village of Boston Heights south corp limit to SR 303. 97779~|~1~|~1~|~01/NFA~|~State 14/Enterprise Pkwy improvements for access to the industrial park 100942~|~1~|~1~|~01/STR~|~This plan split is for the rural route. 100942~|~1~|~2~|~02/S<2~|~This plan split is for the small urban route. 100942~|~1~|~3~|~03/NHS~|~This plan split is for the NHS section. 120890~|~1~|~1~|~01/NFA~|~Widen & pave river access road 92173~|~1~|~1~|~01/IMS~|~Statewide ITS maintenance and upgrade 101436~|~1~|~1~|~01/S<2~|~Preventive Maintenance: MicrosurfacingMED-3-0.00 to 3.80WAY-3-26.13 to 28.35WAY-57-1.25 to 2.20 WAY-57-4.82 to 5.00 101436~|~1~|~2~|~02/STR~|~Preventive Maintenance: MicrosurfacingWAY-57-0.00 to 1.25WAY-57-5.00 to 10.66 101436~|~1~|~5~|~05/S>2~|~Preventive Maintenance: Microsurfacing WAY-57-10.66 to 10.82 Akron urbanized Area. 101436~|~1~|~4~|~04/STR~|~Bridge Work STP Rural:WAY SR 0057 - 01.060 SFN 8502587WAY SR 0057 - 08.470 SFN 8502676 101436~|~1~|~3~|~03/S<2~|~Bridge work for STP < 200000:MED SR 0003 - 02.200 SFN 5200024MED SR 0003 - 02.370 SFN 5200067 116708~|~1~|~1~|~01/S>2/CANF~|~Resurfacing, urban paving in the City of Canfield. 116708~|~1~|~2~|~02/NHS~|~Resurfacing. 116708~|~1~|~3~|~03/S>2~|~Resurfacing. 116708~|~1~|~4~|~04/STR~|~Resurfacing. 116708~|~1~|~5~|~05/NHS~|~Bridge preventative maintenance. 116708~|~1~|~6~|~06/STR~|~Bridge preventative maintenance. 115546~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 102819~|~1~|~1~|~01/NHS~|~NHS Pavement 93774~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay with repair treatment on VIN 50 4.91-9.19. Work includes asphalt overlay treatment on VIN 50 9.19-10.68. Rural other federal aid funded 80 federal/20 state. 119557~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funded scope 120997~|~1~|~1~|~01/S>2~|~Resurfacing on the large urban portion 120997~|~1~|~2~|~02/STR~|~Resurfacing on the Rural portion 109312~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 60 8.60-8.88. Funded 100% state ER. 98561~|~1~|~1~|~01/IMS~|~test 77049~|~1~|~1~|~01/NHS~|~Reconstruction from High level bridge to North Akron (SLM 2.13 to 4.30) 83695~|~1~|~1~|~01/SAE~|~100% federal signal work at 5 intersections and post-construction signal optimization in City of Marion 83695~|~1~|~2~|~02/S<2~|~80% federal & 20% local funding for curb ramp work at signals in City of Marion 113658~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 81 1.50-1.53 Work includes retaining structure installation for appx 145 ft, including roadway repair and guardrail installation. 112370~|~1~|~1~|~01/BRO~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 109928~|~1~|~1~|~01/STR~|~Resurfacing on SR 613 in Hancock County from the Findlay Urban Area Boundary at TR 229 at 14.33 to the end of the project at SR 18 at 18.65. District Preservation funds. No local funds. 109928~|~1~|~2~|~02/S<2~|~Resurfacing on SR 613 in Hancock County from the end of the concrete pavement at 13.08 to the Findlay Urban Area Boundary at TR 229 at 14.33. District Preservation funds. No local funds. 77238~|~1~|~1~|~01/IMS~|~Widening of IR 70 from Palmer Road to SR 158 121248~|~1~|~2~|~02/STR~|~Chip seal. 121248~|~1~|~1~|~01/S>2~|~Chip seal. 124901~|~1~|~1~|~01/CMQ~|~CMAQ MPO funds 99797~|~1~|~1~|~01/STR~|~Replacing the linked culverts. 103959~|~1~|~1~|~01/NHS~|~Reconstruct ramp 103959~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 117531~|~1~|~1~|~01/NFP~|~CIPP Liners 117531~|~1~|~2~|~02/NHS~|~CIPP Liners. 117531~|~1~|~3~|~03/NHS~|~CIPP Liners 124408~|~1~|~1~|~01/NHS~|~OH Share 124408~|~2~|~2~|~02/NHS~|~WV Share 110078~|~1~|~1~|~01/NHS~|~Consultant construction engineering 88978~|~1~|~1~|~01/NHS~|~BRO SR125 0.00 - 6.42 resurfacing projectOn SR125, beginning at the Clermont/Brown County line (SLM 0.00) heading east for (SLM) 6.42 miles, it is proposed to resurface the existing asphalt roadway.Pave thru brdg:0802263 BRO SR125 1.31 Intersect: Trib Of Cloverlick Creek80/20 split01/NHS/PV/State 88978~|~1~|~2~|~02/STR~|~Overlay on BRO 125 20.50 (SFN 0802506) 115529~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County CEAO LBR Funding - 4B87 (100% Federal) - Replacement of SFN 6037240 carrying Darlington Drive over Johnathan Creek 121036~|~1~|~1~|~01/STR~|~Spot paving various locations 102979~|~1~|~1~|~01/STR~|~Microsurfacing on rural route: CLA SR 41 SLM 4.99 to 6.04 & 11.02 to 12.05. 91861~|~1~|~1~|~01/STR~|~Resurfacing and pavement repair on a portion of US 127 in Preble County from I-70 to the Darke County line 106876~|~1~|~1~|~01/STR~|~MED 252 & MED 3 106876~|~1~|~3~|~03/SAF~|~Add a turn lane at MED-3-19.63 106876~|~1~|~2~|~02/S>2~|~MED-3-13.54 to 14.95 111246~|~1~|~1~|~01/NFP~|~01/NFP/PV/ -Plan Split 1 96632~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. ATH 33 15.60 L (SFN 0505900), ATH 33 15.67 R (SFN 0506044), ATH 33 15.67 L (SFN 0506028). NHS route funded 80 federal/20 state. 96632~|~1~|~2~|~02/BRO~|~Concrete bridge deck overlay. ATH 33 15.60 R (SFN 0505927). Bridge on system eligible funded 80 federal/20 state. 110271~|~1~|~1~|~01/IMS~|~Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue due to a landslide. The slide has currently has damaged the guardrail and culvert in the slide limits. Work will require embankment repair and installation of drainage measures to control roadway drainage. 121509~|~1~|~1~|~01/SAF~|~TSG & Lighting Maintenance 112822~|~1~|~1~|~01/STR~|~Resurfacing SR 39 from SLM 7.19 to SLM 13.08 112822~|~1~|~2~|~02/S<2~|~Resurfacing SR 39 from SLM 13.08 to SLM 13.48 112822~|~1~|~3~|~03/NHS~|~Resurfacing SR 39 from SLM 13.48 to SLM 13.57 111414~|~1~|~1~|~01/SAF~|~Safety funded plans split 106991~|~1~|~1~|~01/STR~|~GSMP Slide repair. 87728~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 87728~|~1~|~2~|~02/SAF~|~Replacement of a Type A end anchor with a Type E end anchorHFST at RIC-RA-70066 (High Friction Surface Treatment RIC-RA-70066 (I-71 SB to US-30 WB) 87728~|~1~|~3~|~03/NHS~|~Structure Repairs on:RIC-314-5.05 (Patching Concrete Structure)RIC-30-5.50 (Patching Concrete Structure)RIC-30-6.20 (Patching Concrete Structure)RIC-30-8.79 (Patching Concrete Structure) 97209~|~1~|~1~|~01/STR~|~Cost to cover all culvert, roadway, and traffic control costs to replace Culvert CLE-131-0656. 109558~|~1~|~1~|~01/NFP~|~Construct salt yard along SR 41 88228~|~1~|~1~|~01/MPO~|~Construct multi-use trails and make the necessary improvements along Garnsey Street from the Great Miami River Recreational Trail to mote Park and commercial Street from Garnsey Street to Piqua activity Trail to designate the bike route and enhance the pedestrian pathways. Street improvements include modest curb, sidewalk, drainage and pavement base repairs, new surface asphalt, signage, PM's and tree plantings. 100873~|~1~|~2~|~02/NHS~|~Culvert replacement project for FY2021. GAL 35 4.820 (CFN 1820882), GAL 35 13.370 (CFN 1819533), and WAS 50 2.269 (CFN 1885941). NHS route. 100873~|~1~|~1~|~01/STR~|~Culvert replacement project for FY2021. HOC 278 8.020 (CFN 1811280). Rural other federal aid. 88254~|~1~|~1~|~01/IMS~|~LUC IR475 9.3-9.9 88254~|~1~|~2~|~02/NHS~|~LUC US23 9.63-10.4 115359~|~1~|~1~|~01/MPO~|~Resurfacing. 108367~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 32.15, DSR MEG-002. Rural other federal aid funded 100% federal. 123231~|~1~|~1~|~01/BRO~|~Bridge repair. 103120~|~1~|~1~|~01/SAF~|~Installation of Mast Arms at MED SR 0003 14.95 and Fenn Road. 121280~|~1~|~1~|~01/NHS~|~Plan Split for resurfacing work 95495~|~1~|~1~|~01/NFP~|~Plan split for 100% state funded culvert work using the District Preservation Program SAC 4PS7. 106114~|~1~|~1~|~01/NHS~|~DSR JEF-002 104501~|~1~|~1~|~01/IMS~|~Concrete pavement repair on IR. 109693~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7 97082~|~1~|~1~|~01/NFP~|~Roadway Split. 92988~|~1~|~4~|~04/STR~|~"04/STR/BR/ " - Disrtict Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on 1) Mus-345-0020 and 2) Per-345-0649 92988~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Mus-SR 345-00.01.60; 2) Per-SR 345-00.00-09.22; 92988~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Per-SR 383-00.00 to 01.50 92988~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-SR 345-01.60-02.52 116505~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing. 87630~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Fast Dry Striping within District 5 on IR; US; and SR 114151~|~1~|~1~|~01/SAF~|~Construct pedestrian facilities along SR224 97444~|~1~|~1~|~01/SAF~|~Installation of roundabout at CR 6 (Friendsville Road) and CR 86 (Smithville-Western Road) in Wayne County. 76451~|~2~|~5~|~05/BRO~|~"05/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004112 GUE SR209 9.84 Intersect: Over Wills Creek; BR Eligible for Rehabilitation: Length=172 SD/FO(1) SR=94.1 DSR=4 76451~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Gue-SR 209-11.53 to 12.85; 2) Gue-SR 209-14.44 to 14.65; 3) Gue-SR 209-14.65 to 15.07; 76451~|~2~|~6~|~06/NHS~|~"06/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004058 GUE SR209 8.56 Intersect: Over Wills Creek & CSX RR; Not BR Eligible for Rehabilitation: Length=484 SD/FO(0) SR=60.8 DSR=5 76451~|~1~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Resurfacing on Gue-SR 821-05.45to 05.94; 76451~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Urban NHS resurfacing on 1) Gue-SR 209-10.71 to 10.76; 2) Gue-SR 209-10.99 to 11.00; 3) Gue-SR 209-11.03 to 11.23; 4) Gue-SR 209-11.32 to 11.53; 5) Gue-SR 209-12.85 to 14.44; 76451~|~1~|~1~|~01/NHS/CAMB~|~"01/NHS/PV/CAMB" - District Preservation 4PF7(Federal 80%) / 4BG7(Local 20%) - No CAP - Urban Paving in the City of Cambridge on 1) Gue-SR 209-08.73 to 10.71; 2) Gue-SR 209-10.76 to 10.99; 3) Gue-SR 209-11.00 to 11.03; 4) Gue-SR 209-11.23 to 11.32; 101383~|~1~|~1~|~01/NFP~|~Tree removal/pruning for District 8. 101383~|~1~|~2~|~02/SAF~|~Pruning/tree removal at the District's top ranked curves based on 10-year crash history. 96584~|~1~|~1~|~01/NFP~|~Added plan split due to funding 116657~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay With Repairs including bridge maintenance: RIC-71-10.76to 20.636 116657~|~1~|~2~|~02/SAF~|~Corrective milling/surface treatment on I-71 NB near on-ramps from US-30 and upgrading cable median barrier for entire project limits. 83440~|~1~|~2~|~02/STR~|~Bridge Maintenance/Repair - ASD-430-0003 83440~|~1~|~1~|~01/NHS~|~Bridge Maintenance/Repair - RIC-030-1915 L&R 83440~|~1~|~3~|~03/BRO~|~Bridge Repars - ASD-039-08.97 BR Funds 110386~|~1~|~1~|~01/NHS~|~TLCI work 114211~|~1~|~1~|~01/SAF~|~Friction Improvement on FRA-70 and Ramp from US23SB to SR315SB. 114211~|~1~|~2~|~02/IMS~|~All work associated with the FRA-70 inlet repair, conduit replacement & slope repair falls in this plan split. 97510~|~1~|~1~|~01/NFP~|~Adding Split 1 116932~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing. 109794~|~1~|~1~|~01/SAF~|~Plans split for CEAO HSIP funds 102930~|~1~|~1~|~01/IMS~|~Interstate funding eligible. 105708~|~1~|~1~|~01/SAF~|~plan split 115356~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing. 115446~|~1~|~1~|~01/NHS~|~Lighting upgrade at ROS 23/35 & 23/159 113932~|~1~|~1~|~01/STR~|~AC Overlay with repairs 113932~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 101517~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. HOC 56 0.00-4.41 and HOC 180 14.43-16.32. Federal Aid route, 80% Federal/20% State funds. 124813~|~1~|~1~|~01/NFA~|~Repair bridge carrying SR 520 over Black Creek by encasing pier piling. In Stream Work Required. 105494~|~1~|~1~|~01/IMS~|~Interstate plan split 105494~|~1~|~2~|~02/STR~|~Rural Plan Split 105494~|~1~|~4~|~04/NHS~|~NHS Plan Split 119116~|~1~|~2~|~02/SAF~|~Installation of a turn lane on GAL SR 325. Safety funded 90% Federal/10% State. 110556~|~1~|~1~|~01/STR~|~BRO-68-44.12 SFN 0802042 96279~|~1~|~1~|~01/NFA~|~Full Service Maintenance Facility 105033~|~1~|~1~|~01/S<2~|~80/20; MPO/local 105033~|~1~|~2~|~02/NFA~|~100% Local Items, e.g. waterline 101842~|~1~|~1~|~01/S<2~|~Project to install Rock Channel Protection at bridge WAR-123-2877 to repair the scour that has occurred and protect the bridge from further stream meander. 102316~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various Darke County Roads 91152~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2014 herbicidal spraying. 100% State. 101096~|~1~|~1~|~01/IMS~|~6 bridges. 101096~|~1~|~2~|~02/NHS~|~Linked bridges 101096~|~1~|~3~|~03/STR~|~Other functionally classified bridges 98653~|~1~|~1~|~01/STR~|~WIL SR49 98653~|~1~|~2~|~02/STR~|~WIL-SR49 99019~|~1~|~1~|~01/SAF~|~District wide polyester pavement marking 76266~|~1~|~1~|~01/SAF~|~Safety project thru the unincorporated community of Berlin to improve congestion and mitigate crashes on this section of US 62. 76266~|~1~|~2~|~02/ERD~|~This funding split is to be used for the difference in pay items for the aesthetics/deocorative pay items as part of the construction project. 106294~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties. 103918~|~1~|~1~|~01/STR~|~Temporary repair of the slip on PIK CR 50 1.95 DSR# PIK-001 115720~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation to MUS-555-4.41 (SFN 6006000) and MUS-555-5.16 (SFN 6006094). 106116~|~1~|~1~|~01/NFP~|~Guardrail 91814~|~1~|~1~|~01/NFA~|~To perform pavement repairs, asphalt concrete, and/or aggregate resurfacing in the following ODNR wildlife areas: 1.) Pickerel Creek in Sandusky Co. 2.) Little Portage in Ottawa Co. 3.) Willow Point Wildlife in Sandusky/Erie Co. 4.) Resthaven Wildlife Area in Sandusky/Erie Co. 89431~|~1~|~1~|~01/STR~|~District Pavement Marking project. 100% State Funds 114686~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs:ASD-60-11.743 to 15.739ASD-302-5.370 to 8.838; 10.969 to 11.224ASD-511-15.281 to 17.992 114686~|~1~|~3~|~03/S5K~|~Asphalt Concrete Overlay with Repairs:ASD-60-15.739 to 16.381ASD-511-14.530 to 15.281 114686~|~1~|~2~|~02/IMS~|~Bridge maintenance work on ASD-60-15.79 (SFN 0302228) 101919~|~1~|~1~|~01/IMS~|~Work to texture the pavement to improve surface friction and safety. 97651~|~1~|~1~|~01/NFA~|~Chip Sealing HAS-258 from 0.00 to 3.02 and TUS-258 from 19.45 to 20.90 including new pavement markings. 97651~|~1~|~2~|~02/STR~|~Chip Sealing TUS-258 from 20.90 to 21.23 and HAS-331 from 0.00 to 3.05 including new pavement markings. 107700~|~1~|~1~|~01/STR~|~Resurfacing on US 127 outside the Van Wert urban area using district preservation funds (80% 4PF7 and 20% 4PS7). Work is from the Mercer County line at SLM 0.00 to the Van Wert Urban Area limits at TR 91 Dustman Road at SLM 7.03. 107700~|~1~|~2~|~02/S<2~|~Resurfacing on US 127 inside the Van Wert Urban Area but outside of the City of Van Wert. Work is on both sides of the road from the Van Wert Urban Area limits at TR 91 Dustman Road at SLM 7.03 to where US 127 enters the City of Van Wert on the right side at 7.33, then on the left side of US 127 until US 127 leaves the City of Van Wert on the right side at SLM 7.53, then on both sides of the road until it re-enters the City at SLM 7.79, then on the left side until SLM 8.00. Federal and state funds from the District preservation program budget. No local funds. 107700~|~1~|~4~|~04/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds. 107700~|~1~|~3~|~03/S<2/VAN~|~Resurfacing on US 127 inside of the City of Van Wert. Work is on the right side of the road from where US 127 enters the City of Van Wert at 7.33 until US 127 leaves the City at 7.53, on the right side from where US 127 re-enters the City at 7.79 and then on both side starting at 8.00 until the end of the project at Hospital Drive at SLM 8.54. Federal funds from the District Preservation Program budget with the 20% match provided by the City of Van Wert. 100473~|~1~|~1~|~01/STR~|~Microsurfacing of HOL-62 88758~|~1~|~1~|~01/S<2~|~Replace deteriorating wearing surface with MSC with no (Minimal)approach work on SFN 1902040 DAR 121 1876 (US 127). 79756~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 120482~|~1~|~1~|~01/IMS~|~Plan split for parapet repair work on LUC-75-0029L bridge 112916~|~1~|~1~|~01/NHS~|~PIC-23 from 5.20 to 6.29, 6.79 to 7.21, 7.22 to 7.72, 7.73 to 9.00 and 9.01 to 11.47 122894~|~1~|~1~|~01/NFP~|~All work included in this plan split. 113199~|~1~|~1~|~01/SAF~|~All work to construct the new overhead. Safety program funds with the funds needed over the safety program cap provided by the District. 90896~|~1~|~1~|~01/SAE~|~Install sidewalks along Nelson Avenue from Truesdell Street to Warren Drive and install the missing sections of sidewalk on the south side of Truesdell Street between Nelson Avenue and Randolph Street 103929~|~1~|~1~|~01/MPO~|~Work eligible for providing bicycle lanes/shared use lanes along Lee Road in the City of Shaker Heights. 100334~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project 110439~|~1~|~1~|~01/STR~|~Resurfacing and related bridge work in STR sections 110439~|~1~|~2~|~02/NFA~|~Resurfacing and related bridge work in sections not on federal aid system. 110439~|~1~|~3~|~03/NFP~|~Removal of railroad crossings. 113791~|~1~|~1~|~01/NHS~|~Construction Contract funding split to repair structure JEF-22-0590 (SFN 4101804) from collision with over height vehicle. 109111~|~1~|~1~|~01/IMS~|~Upgrade lead in signing at the US 23/IR 270 interchange 108526~|~1~|~1~|~01/MPO~|~NOACA 101549~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 145 0.84. DSR WAS-005. ER funded, 80% Federal and 20% State. 83829~|~1~|~1~|~01/NHS~|~Resurfacing project. 118427~|~1~|~1~|~01/S>2~|~Plan split for federally eligible construction items 124641~|~1~|~1~|~01/IMS~|~Pavement replacement. 122870~|~1~|~1~|~01/CMQ~|~Signal upgrades/replacements. 101792~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" Licking County bridge replacement project on TR214 over stream. Project approved for CEAO federal/state exchange with a maximum dollar approval of $378,400. 103543~|~1~|~1~|~01/NHS~|~Ramp clear project. Work includes roundabout and turn lane construction. HOC US 33 11.70-11.95. Funding is Federal Safety 90% and 10% State Safety. 103543~|~1~|~2~|~02/S<2~|~Ramp clear project. Work includes roundabout and turn lane construction. HOC SR 328 11.39-11.63 and CR 418 0.00-0.21. Funding is 90% Federal Safety and 10% State Safety. 114377~|~1~|~1~|~01/S>2~|~Reconstruct and upgrade signal at FRA SR3 and Paris Court 116030~|~1~|~1~|~01/STR~|~Plan Split "01/STR/OT/ " - 4CP7 (100% Maintenance) - district wide guardrail repair. 123783~|~1~|~1~|~01/S5K~|~STP 5K-50K 123783~|~1~|~2~|~02/STR~|~stp rural 123783~|~1~|~3~|~03/NHS~|~NHS plan split. 92951~|~1~|~1~|~01/BRO~|~80/20 funding split for bridge work eligible for BR funds 112713~|~1~|~1~|~01/NHS~|~District bridge rehab project in various locations 109528~|~1~|~1~|~01/SAF~|~install stop-bar radar detection 104971~|~1~|~1~|~01/IMS~|~Plan Split for Bridge FRA-270-47.32 79733~|~1~|~1~|~01/NHS~|~Resurfacing 116724~|~1~|~1~|~01/STR~|~Plan split for rural roadway 116724~|~2~|~2~|~02/S5K~|~Split for CR-201 from 0.00 to 0.38 - (pop. 5,000 - 49,999) 117380~|~1~|~1~|~01/BRO~|~Complete structure replacement utilizing CEAO BFP Federal (4B87) funds at 100% up to maximum of $1,045,000. 123749~|~1~|~1~|~01/S>2~|~STP > 200,000 Plan Split 119721~|~1~|~1~|~01/S5K~|~All work included in this split. 119806~|~1~|~1~|~01/SAF~|~Construct roundabouts at the intersections of SR 4/SR 347 and SR 31/SR 347 96145~|~1~|~1~|~01/NHS~|~01/NHS/OT ; $842,700 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) Program. Funds needed over this amount will come from the District Preservation Program budget. 105816~|~1~|~1~|~01/MPO~|~MORPC funded items 105816~|~1~|~2~|~02/S>2~|~100% Upper Arlington funded items 116077~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 109684~|~1~|~1~|~01/STR~|~Resurfacing HOL-60 92779~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on a portion of SR 134 in Clinton County from SLM 2.2 to 7.52 92779~|~1~|~2~|~02/STR~|~Split to capture costs related to Bridges CLI-134-0225 (SFN 1402870), CLI-134-0671 (SFN 1402927), and CLI-134-0682 (SFN 1402951). 110066~|~1~|~1~|~01/NFP~|~Plan split for GR maintenance 117497~|~1~|~1~|~01/BRF/CCEO~|~Replacement of the existing bridge superstructure. Repairs to the pier cap. 121790~|~1~|~1~|~01/SAF~|~GR on various routes in Adams County. 92070~|~2~|~2~|~02/SAF~|~added split for drainage and water lines to be reconstructed during the project 92070~|~1~|~1~|~01/SAE~|~SRTS Project (sidewalks) 107072~|~1~|~1~|~01/NFA~|~ADA VAR CR PM. 108023~|~1~|~1~|~01/NFP~|~Mowing with Additive Alternates for mowback 123230~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation. 95170~|~1~|~1~|~01/NFP~|~Task order PID for the consultant to provide construction engineering inspection services throughout the district. 94297~|~1~|~1~|~01/STR~|~Landslide repair project using GSM funds. ATH 56 4.95-5.02. Rural other federal aid 80 federal/20 state. 97959~|~1~|~1~|~01/NFA~|~Township Rds 113325~|~1~|~1~|~01/NHS~|~C.O. Major Rehab funds, pavement and bridge work included 113325~|~1~|~2~|~02/BRO~|~Bridge rehab work. 101797~|~1~|~1~|~01/NHS~|~Painting the linked structures >20' span. 101797~|~1~|~2~|~02/STR~|~Painting linked structure >20' span. 118501~|~1~|~1~|~01/STR~|~Culvert Replacement 100969~|~1~|~1~|~01/IMS~|~Construction Inspection 87275~|~2~|~2~|~02/S<2/NP~|~Urban System asphalt resurfacing for areas of TUS-259 from 0.00 to 4.41 that ARE within the City Limits (this project travels in and out of the corporation limits several times); project includes asphalt paving, pavement marking 87275~|~1~|~1~|~01/S<2~|~General system minor rehab for areas of TUS-259 from 0.00 to 4.41 that are NOT within the City limits; includes asphalt paving, pavement repair, pavement markng, 87275~|~3~|~3~|~03/S<2/NP~|~Urban System rehab project on TUS-259-0.00 to 4.41;includes 100% city paid items: curb ramps, aux. pavement markings, signal loops 116924~|~1~|~1~|~01/CMQ/HUDS~|~Signal upgrades/replacements. 118664~|~1~|~1~|~01/SAF~|~Guardrail project. 113712~|~1~|~1~|~01/SAF~|~Install street lighting and sidewalk on the north side fo West Road in the City of Harrison. This will require the existing bridge over I-74 to be widened. 113712~|~2~|~2~|~02/BRO~|~split for the cost to widen the SFN 3107957 required as part of the sidewalk connectivity project at West Road in City of Harrison at the bridge over I-74 97564~|~1~|~1~|~01/NFA~|~Mercer County Garage fueling system with abovegound storage tank system 124463~|~1~|~1~|~01/NFP~|~Entered for TID Involvement. 96235~|~1~|~2~|~02/S>2/GAH~|~STP>2 Urban. SLM 23.80-25.91; 26.40-26.51 Gahanna 96235~|~1~|~1~|~01/NHS/GAH~|~HNS Urban. SLM 22.60-23.80 Gahanna 96235~|~1~|~3~|~03/S>2~|~STP>2 General. SLM 25.91-25.94; 26.32-26.4; 26.51-26.81 114693~|~1~|~1~|~01/SAE~|~District wide signal contract 105289~|~1~|~1~|~01/STR~|~Resurfacing COL-164 105289~|~1~|~2~|~02/NFA~|~Asphalt resurfacing at Beaver Creek State Park 92689~|~1~|~1~|~01/STR~|~This split is for rural STP funds with a state match. 115654~|~1~|~1~|~01/BRO~|~Bridge maintenance of SFN 4931955 87572~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement 123825~|~1~|~1~|~01/IMS~|~Plan split for the emergency added temporary lane to remove traffic from the slow lane 91312~|~1~|~1~|~01/IMS~|~Minor pavement rehab, FRA-270: 29.58-32.47 99387~|~1~|~1~|~01/S>2~|~"01/S>2/OT/ " - Plan split for construction of a new outpost building at the existing Etna Outpost location. 85362~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 120974~|~1~|~1~|~01/BRF~|~Bridge Replacement 100987~|~1~|~1~|~01/STR~|~DSR# BEL-008 92420~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds for the District budget SAC 4PS7. 99923~|~1~|~1~|~01/SAF~|~Upgrade and construct sidewalk along Fifth St from Grove St to Maple St 119003~|~1~|~1~|~01/NFA~|~CEAO LBR BFP funded at 100% 96726~|~1~|~1~|~01/NFA~|~Stark County Canton South Garage, partner with the City of Canton - CNG station supplied by the City of Canton with ODOT possibly building a Salt Storage Facility - currently in preliminary discussion phase. 116766~|~1~|~1~|~01/S5K~|~Resurfacing. 112222~|~1~|~1~|~01/SAF~|~Safety funded items 96678~|~1~|~1~|~01/NFP~|~FY 2019 Bridge Maintenance on various Routes in ATB, MAH and TRU Counties. 79790~|~1~|~1~|~01/IMS~|~90/10 District Allocation 96379~|~1~|~1~|~01/S<2~|~District Preservation 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Bridge replacement on 6006426 MUS-666-2.01 Intersect: Over Ditch; Not BR Eligible: Length=15 SD/FO(1) SR=0.0 DSR=4; 94074~|~1~|~1~|~01/IMS~|~100% state funding split for all work on this project. 101334~|~1~|~1~|~01/STR~|~Rehabilitation of one structure. 107784~|~1~|~3~|~03/S>2~|~Items to be paid 100% by Canal Winchester including signal detection. ODOT will contribute $51,000 to the signal detection upgrade (estimated cost of replacing pavement loops) 107784~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split (Canal Winchester): FRA-674-2.26-4.48 107784~|~1~|~2~|~02/S>2~|~General System Split: FRA-674-2.20-2.26 101682~|~1~|~1~|~01/NFP~|~Split for work on the structure. No federal funds at this time. 118638~|~1~|~1~|~01/S5K~|~Mill and fill multiple locations (4B97 Small City Program to provide 95% of eligible costs, up to a maximum of $1,447,766). 119899~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-A 113341~|~1~|~1~|~01/NFP~|~District Maintenance Mowing - 4CP7 (State 100%) - No CAP - Mowing along Interstates and Interstate Look-a-likes 92176~|~1~|~1~|~01/NFP~|~Districtwide RPM project 96241~|~1~|~2~|~02/S<2~|~STP<2. SLM 0.00-0.90 WCH 96241~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.90 to 5.35 96241~|~1~|~3~|~03/STR~|~FAY SR 38 0.58-5.47 122835~|~1~|~1~|~01/SAE~|~Roundabout 118632~|~1~|~1~|~01/IMS~|~Resurfacing with asphalt concrete 118632~|~1~|~2~|~02/NHS~|~Resurfacing with asphalt concrete 118632~|~1~|~3~|~03/S>2~|~Resurfacing with asphalt concrete 118632~|~1~|~4~|~04/S50~|~Resurfacing with asphalt concrete 118632~|~1~|~6~|~06/STR~|~Resurfacing with asphalt concrete 118632~|~1~|~5~|~05/S5K~|~Resurfacing with asphalt concrete 124487~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement 115676~|~1~|~1~|~01/NFP~|~Landslide repair. 112188~|~1~|~1~|~01/NHS~|~Resurfacing. 112188~|~1~|~2~|~02/S>2~|~Resurfacing. 112188~|~1~|~3~|~03/S5K~|~Resurfacing. 112188~|~1~|~4~|~04/STR~|~Reurfacing. 121514~|~1~|~1~|~01/IMS~|~Resurfacing. 95142~|~1~|~1~|~01/S<2~|~Culvert replacement project. GAL 554 19.94. Urban federal aid funded 80 federal/20 state. 89486~|~1~|~1~|~01/SAF~|~Resurface and widen the existing pavement to 24' and widen the existing shoulder to 6-8 feet on each side of the road. Correct clear zone deficiencies, improve curv, signage, superelevation, and intersection geometrics, replace culverts as needed, MER CR 144 (Mud Pike Road) from SLM 4.30 to SLM 6.84. 107867~|~1~|~1~|~01/CMQ~|~The Project will change traffic signal controllers, pedestrian and vehicular signal heads and pedestrian pushbuttons. Other equipment will be replaced such as load switches, conflict monitors, relays and DC Isolators. 103633~|~1~|~1~|~01/IMS~|~Concrete pavement repairs to SUM-IR 76 from 15.18 to 15.86. 107698~|~1~|~1~|~01/STR~|~Resurfacing on US 127 using district preservation funds (80% 4PF7 and 20% 4PS7). 87635~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - TBD (100% State) - Two year contract for Guardrail repairs; upgrades; and replacement within District 5 on IR; US; and SR 120378~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 88615~|~1~|~1~|~01/NHS~|~Line or replace 11' structureSFN 8001413, UNI-33-18.77, Sugar Run Branch 115357~|~1~|~1~|~01/MPO/NORT~|~Resurfacing 85147~|~1~|~2~|~02/NHS~|~Split for work on the NHS bridges over Lakeland Blvd and the RR not eligible for BR funding. 85147~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split using federal BR funds for work on the structure over SR-2. 93433~|~1~|~1~|~01/CMQ~|~Signal upgrade. Possible turn lane additions. ADA pushbuttons, Video detection, un-interrupted power supply. Pavement markings and signing. In the City of Akron. 114703~|~1~|~1~|~01/STR~|~Overlay on 770. 114703~|~1~|~3~|~03/STR~|~Bridge PM 114703~|~1~|~2~|~02/NFA~|~Overlay on 770. 107159~|~1~|~1~|~01/BRF~|~Plan SPlit 106265~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-33-18.85-21.91 106265~|~1~|~2~|~02/S>2~|~City of Columbus (100% Ineligible Work Items) 117359~|~1~|~1~|~01/BRF~|~Bridge Replacement 123741~|~1~|~1~|~01/CMQ~|~Realignment of Trabue Road with Walcutt Drive and convert the intersection into a roundabout. 123741~|~1~|~2~|~02/CMQ~|~Realignment of Trabue Road with Walcutt Drive and convert intersection to a roundabout. 111259~|~1~|~1~|~01/NFA~|~Geneva State Park resurfacing. 98758~|~1~|~1~|~01/BRO~|~Bridge repair work using BR funds 94518~|~1~|~1~|~01/NFA~|~Improvements to the Cincinnati Barge and Rail Terminal. 123791~|~1~|~1~|~01/STR~|~stp rural 88592~|~1~|~1~|~01/ERD~|~ROS CR205, SFN 7144253, 9.83, Intersect Indian CreekCO CC 01 100% Fed Earmark OH409 CO CC 02 100% Ross Co. local match 01/ERD/BR/Ross 98936~|~1~|~1~|~01/STR~|~Resurfacing spot locations throughout the eastern part of District 11. 119249~|~1~|~1~|~01/NHS~|~NHS Plan Split. 91786~|~1~|~1~|~01/SAE~|~Guardrail repair various locations 99917~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for upgrading guardrail on county roads 81828~|~1~|~1~|~01/IMS~|~Unfunded project of 70/71/315 west interchange upgrade 100842~|~1~|~1~|~01/S<2~|~Slide repairs 113090~|~1~|~1~|~01/STR~|~Resurfacing. 112628~|~1~|~1~|~01/MPO/LORD~|~Resurfacing of Hallock-Young Rd from Ellsworth-Bailey Rd to SR 45 in the Village of Lordstown. 112628~|~2~|~2~|~02/NFA~|~Fuel price adjustment 92610~|~1~|~6~|~06/BRO~|~BR eligible bridge rehab (new decks):SFN 2513501, 270 over US23, FRA-270-52.72LSFN 2513528, 270 over US23, FRA-270-52.72A 92610~|~1~|~5~|~05/NHS~|~NH bridge widening of 1 through lane on bridge rehabs:SFN 2513293, 270 over Scioto Big Run, FRA-270-54.12LSFN 2513269, 270 over Scioto Big Run, FRA-270-54.12R 92610~|~1~|~2~|~02/NHS~|~NH pavement addition of 1 through lane on FRA-270 SLM 52.72-54.97 92610~|~1~|~4~|~04/IMS~|~IM funds for bridge rehab, not BR eligible:SFN 2513293, 270 over Scioto Big Run, FRA-270-54.12LSFN 2513269, 270 over Scioto Big Run, FRA-270-54.12RSFN 2513471, 270 over US23, FRA-270-52.72R 92610~|~1~|~1~|~01/IMS~|~IM pavement replacement and construction of auxiliary lane on FRA-270 SLM 52.72-54.97 92610~|~1~|~3~|~03/IMS~|~IM funding for structure removals:SFN 2513382, 270 over Access Rd, FRA-270-53.40RSFN 2513412, 270 over Access Rd, FRA-270-53.40L 85091~|~1~|~1~|~01/STR~|~This split is for resurfacing of SR111 and SR637 using rural STP funds. 120988~|~1~|~1~|~01/S5K~|~Work within STP 5,000 - 49,999 120988~|~1~|~2~|~02/STR~|~Work within STP Rural 117975~|~1~|~1~|~01/STR~|~Landslide Repair Project. MRG 37 8.09. Funded 80 Federal/20 State GSM. 103015~|~1~|~1~|~01/NFA~|~ADA TR 250 2.79 ODNR Slip Repair 92803~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 78 2.98, SFN 5601479. Rural other federal aid funded 80 federal/20 state. 106347~|~1~|~1~|~01/STR~|~Spot paving throughout District 11. 119892~|~1~|~1~|~01/NHS~|~Pavement repairs on the concrete portion of GRE-35 92238~|~1~|~1~|~01/NFA~|~Salt Shed at White Oak Salt Shed 104918~|~1~|~1~|~01/NFA~|~Washington Schools school bus replacement project 92444~|~1~|~2~|~02/NFP/MASS~|~Drainage work and other miscellaneous 100% City funded items along State Route 172, City of Massillon, Stark County, Ohio. 92444~|~1~|~3~|~03/NHS~|~Resurfacing of STA-SR 172 from 6.86 to 7.74 in the City of Massillon. 92444~|~1~|~1~|~01/NFP~|~Minor bridge work on sfn#7600755, STA-SR172-7.55, sfn#7606753, STA-SR800-8.33, sfn#7606516, STA-SR627-4.32 and sfn#7605889, STA-SR212-1.34 in Stark County, Ohio. 118587~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - 97123~|~1~|~1~|~01/SAF~|~Plan split for all the lighting maintenance work. 105570~|~1~|~1~|~01/STR~|~All work in the project. All funds from the District Preservation Program budget. No local funds. 114229~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements. 103838~|~1~|~1~|~01/NFA~|~The county will construct approximately 2,100 feet of New Beginnings Road (TR705) in Lebanon Township, starting SR 124 and ending at 53050 New Beginnings, Rd. a 20" wide asphalt road with existing base with gravel berms and open ditches. 96895~|~1~|~1~|~01/NHS~|~Highway lighting replacement project at TUS-36-0.91 (College Street), TUS-36-1.58 (SR 258) and TUS-36-2.97 (CR 15). 87038~|~1~|~1~|~01/SAF~|~Project for systematic sign upgrades in villages and other missed areas that need upgrading in Clinton County. 103135~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY19 Construction Engineering Services 103135~|~1~|~2~|~02/STR~|~Plan Split 02 created for Construction Engineering Services in FY20 104238~|~1~|~1~|~01/NHS~|~Bridge repair structure MAD-42-6.32 over Oak Run. SFN 4901207 104110~|~1~|~1~|~01/NFP~|~plan split 101952~|~1~|~2~|~02/NFP~|~Minor bridge work > 20' span. 101952~|~1~|~1~|~01/NFP~|~Resurfacing TRU-SR 5-20.10 to 26.00, TRU-SR 88-14.01 to 17.45 and TRU-SR 88C-0.00 to 0.02, includes rumble stripes. 101952~|~1~|~3~|~03/SAE~|~Adding rumble stripes. 113996~|~1~|~1~|~01/SAF~|~Safety improvements at the Millikin Road/Lesourdsville West Chester Road intersection. 114906~|~1~|~1~|~01/IMS~|~Interstate plan split. 114906~|~1~|~2~|~02/S>2~|~All items of work associated with resurfacing of SR 750. 116709~|~1~|~1~|~01/STR~|~Landslide repair. 108878~|~1~|~1~|~01/SAF~|~Pavement marking on various Union County Roads 110835~|~1~|~1~|~01/STR~|~Bridge replacement. 92866~|~1~|~1~|~01/SAF~|~Unidentified funding for the the intersection improvement. 121419~|~1~|~1~|~01/NHS~|~Plan split for NHS portion of WIL-20A 121419~|~1~|~2~|~02/STR~|~Plan split for non-NHS portion of WIL-20A 94402~|~1~|~1~|~01/STR~|~Resurfacing - Rural 6.83 miles 94402~|~1~|~2~|~02/S<2~|~Resurfacing - Urban 2.44 miles 94402~|~1~|~3~|~03/STR~|~Bridge Work: RIC-97-5.49, RIC-97-8.19 103119~|~1~|~1~|~01/NHS~|~District Allocation (4CP7): Replace School Flasher Signs 103119~|~1~|~2~|~02/NHS~|~4PS7 103119~|~1~|~4~|~04/STR~|~4PS7 funds. 103119~|~1~|~5~|~05/S<2~|~4CP7 103119~|~1~|~6~|~06/S<2~|~4PS7 funds 103119~|~1~|~7~|~07/STR~|~4CP7 Funds 103119~|~1~|~3~|~03/STR~|~4PS7 Funds. 92335~|~1~|~1~|~01/IMS~|~80/20 funding split using federal Geologic Site Managment funding 124955~|~1~|~1~|~01/ENH/AKRO~|~Pedestrian enhancements and road diet. 120815~|~1~|~1~|~01/S>2~|~Work for upgrading traffic signals 102797~|~1~|~1~|~01/IMS~|~SFN 4808045 114829~|~1~|~1~|~01/NFA~|~Created for J&C involvement 102621~|~1~|~1~|~01/NFP~|~Demolish timber salt building, construct new 2000 ton salt building. 122266~|~1~|~1~|~01/S>2~|~Install bike path 118841~|~1~|~1~|~01/STR~|~All microsurfacing work included in this split. 99337~|~1~|~1~|~01/S<2~|~Fron the SR49/SR118 intersection at the traffic circle (SLM 16.49) to Greenmore Road (SLM 17.96) pavement planing and resurfacing with asphalt concrete along with other roadway related items. 99337~|~1~|~2~|~02/S<2~|~This is for work on the City's section - approximately 550' on each approach of the N. Ohio/East Main Street intersection. 101487~|~1~|~1~|~01/STR~|~DSR BEL-001 120673~|~1~|~1~|~01/NFA~|~added funding event CO Contr 1-CEAO 88889~|~1~|~1~|~01/IMS~|~90/10 District Allocation 115513~|~1~|~1~|~01/NFA~|~Added for Jobs & Commerce involvement 112673~|~1~|~1~|~01/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 1 112673~|~1~|~2~|~02/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 2 112673~|~1~|~3~|~03/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 3 112673~|~1~|~4~|~04/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 7 112673~|~1~|~5~|~05/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 8 116314~|~1~|~1~|~01/NFP~|~Plan split for Franklin County ding and dent guardrail on various routes. 117390~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 96042~|~1~|~3~|~03/NHS~|~Seal up bridge expansion joints. Replace various strip seals, strip seal retainer clip repair, removal and replacement of hot applied 705.04 material on various structures. with the district. This split includes: SFN 1200062 CLA-004-0667 R, 1200038 CLA-004-0667 L, 4600894 LOG-33-1988 and 4600916 LOG-11-2080 R. 96042~|~1~|~4~|~04/IMS~|~SFN 7502346, SHE 75 13.47 TR 57 Meranda Road (IF 000) - Repair/Restore expansion joint, patch railing spalls, fix damaged tube railing posts. 96042~|~1~|~1~|~01/IMS~|~Seal up bridge expansion joints. Replace various seals, strip seal retainer clip repair, removal and replacement of hot applied 705.04 material on various structures within the district. This splits includes: SFN 1204297 CLA-70-1151, SFN 5709733 MOT-235-0163 R, SFN 5701368 MOT-004-2427 L, and SFN 5711436 MOT-675-0647. 96042~|~1~|~2~|~02/NHS~|~Seal up bridge expansion joints. Replace various strip seals, strip seal retainer clip repair, removal and replacement of hot applied 705.04 material on various structures within the district. This split includes: SFN 1202731 CLA-68-0741 R, SFN 1202707 CLA-68-0741 L, and SFN 5700159 MOT-004-0192. 114818~|~1~|~1~|~01/SAF~|~Add and lengthen turn lanes and rebuild signal at the intersection of SR 95 and Jamesway Dr. 112655~|~1~|~1~|~01/MPO~|~Resurfacing of West Park Ave from Austintown-Warren Rd to Niles West Corp, and resurfacing of Austintown-Warren Rd from Lordstown East Corp Limit to Carson-Salt-Springs Rd and Burnett-East Rd to Warren South Corp Limit. 87684~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 87684~|~1~|~3~|~03/IMS~|~LOR SR 10 0500 SFN 4701518: (L/R)Preventive Maintenance:Expansion joint repair/replacement (048)Deck Sealing (051)Bridge CleaningReactive Maintenance:Conc patch(non-deck) (010)Deck patching(conc) (049)Minor Rehabilitation:Str steel repair (022) 87684~|~1~|~2~|~02/NHS~|~LOR SR 10 1030 SFN 4708377:Preventive MaintenanceExpansion joint repair/replacement (048)Reactive MaintenanceConc patch(non-deck) (010)Deck patching(conc) (049)Minor RehabilitationSlope repair & prot (082)LOR SR 10 0253 SFN 4704118:Preventive MaintenanceExpansion joint repair/replacement (048)Reactive MaintenanceConc patch(non-deck) (010)Minor RehabilitationConc patching (non-deck) (010)LOR SR 10 0432 SFN 4708474/4708482 (L/R):Preventive MaintenanceExpansion joint repair/replacement (048)Deck Sealing (051)Reactive MaintenanceConc patch(non-deck) (010)LOR SR 10 0471/0472 SFN 4708512/4708520 (L/R)Preventive MaintenanceExpansion joint repair/replacement (048)Deck Sealing (051)Bridge CleaningReactive MaintenanceConc patch(non-deck) (010)Deck patching(conc) (049)Minor RehabilitationStr steel repair (022) 87684~|~1~|~4~|~04/SAF~|~Wet Reflective/Thermoplastic long line costs for the entire project 87684~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 119777~|~1~|~1~|~01/STR~|~added plan split. 121425~|~1~|~1~|~01/S>2~|~Added plan split for construction funding 94424~|~1~|~2~|~02/S<2~|~Smoothseal (Urbanized Area STP): WAY 95 7.97-8.74 94424~|~1~|~1~|~01/STR~|~Smoothseal (STP Rural): WAY 95 0.00-7.97/ ASD 89 0.00-12.03 109039~|~1~|~1~|~01/STR~|~Landslide repair 114190~|~1~|~1~|~01/NHS~|~Slide repair 118772~|~1~|~1~|~01/NHS~|~Fine Graded Polymer Modified Asphalt Concrete Overlay (Smoothseal) 115170~|~1~|~1~|~01/ENH~|~Construction of a new 1.17 mile long extension. Work includes installing a new 14 foot wide asphalt path, a trailhead plaza, storm drainage, pavement striping and signage. 112540~|~1~|~1~|~01/MPO~|~Plan Split for NOACA 4TA7 contributions to the construction and/or CE 110679~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 7 from 0.00 to 3.58. 124161~|~1~|~1~|~01/NHS~|~plan split for noise wall. 110893~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix. 110893~|~1~|~2~|~02/S>2~|~Resurfacing 92265~|~1~|~1~|~01/NFA~|~Plan Split for Sewer. 96308~|~1~|~1~|~01/S>2~|~DEL-36-21.96 over Prairie Run 96120~|~1~|~1~|~01/NFP~|~New fabric salt building and material storage shed at the Wheelersburg Out Post. 91771~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repairs. MOE 26 5.64-14.60. Rural other federal aid funded Federal 80% and State 20%. 115415~|~1~|~1~|~01/STR~|~Two-lane resurfacing project. Work includes an asphalt overlay, striping and berm conditioning. 115415~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project. Work includes an asphalt overlay, striping and berm conditioning. 115415~|~1~|~3~|~03/NFA~|~Resurfacing of MEG CR 28A 0.00-0.229 ramp. Funded 100% State. 124517~|~1~|~1~|~01/IMS~|~Deck overlay 113528~|~1~|~1~|~01/SAF~|~Various pedestrian improvements at various locations in the City of Cincinnati for the Pedestrian Safety Improvement Program. 113528~|~1~|~2~|~02/SAF~|~Install ADA compliant ped heads and push buttons with audible warnings and re stripe crosswalks at the intersection of US-22 and Sherman Ave and the intersection of US-22 & Williams Ave in the City of Norwood. 98423~|~1~|~1~|~01/S>2~|~Resurfacing MAH SR 170 10.94 to 12.55 and MAH SR 616 0.00 to 0.03 98423~|~1~|~2~|~02/NHS~|~Resurfacing MAH SR 616 0.03 to 1.12 and 1.20 to 1.26. 98423~|~1~|~3~|~03/MPO/STRU~|~Concrete section repairs/replacement on MAH SR 616 2.66 to 2.74 in the City of Struthers. 98423~|~1~|~5~|~05/NHS/STRU~|~Resurfacing MAH SR 616 1.12 to 1.20 and 1.26 to 2.66 and 2.74 to 2.94 and 3.33 to 3.79 Urban Paving in the City of Struthers. 98423~|~1~|~4~|~04/NHS~|~Minor Bridge work to linked structure > 20' span. 98423~|~1~|~6~|~06/NHS~|~100% City of Struthers Items, including partial depth repairs on MAH SR 616 from 1.12 to 1.20 and 1.26 to 2.66 and 2.74 to 2.94 and 3.33 to 3.79. 114391~|~1~|~1~|~01/NFP~|~Created for J&C involvement 88673~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2020 119804~|~1~|~1~|~01/NHS~|~Roadway work 115424~|~1~|~1~|~01/S<2/NWRK~|~"01/S<2/BR/NWRK" - replacement of LIC CR 803 1.116 (SFN 4561430) which carries Granville Road over Log Pond Run Diversion Channel. 120595~|~1~|~1~|~01/MPO~|~Demolition of a building on the former Q Lab site, 1400 Harrison Avenue, Cincinnati, OH. 88955~|~1~|~1~|~01/S>2~|~SR 261 1.19 SFN 6704964 & 6704972 plum creek & W&LE RR. 124416~|~1~|~1~|~01/S>2~|~Added split for Cherrybottom Park/Big Walnut Trail 98199~|~1~|~1~|~01/STR~|~"01/STR/CV/ " - District Culvert Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert replacement on: 1) Fai-SR 159-08.53; 98199~|~1~|~2~|~02/NHS~|~"02/NHS/CV/ " - District Culvert Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert replacement on: 1) Fai-SR 37-13.86; 2) Fai-SR 37-13.96; 3) Fai-SR 37-14.03; 4) Fai-SR 37-14.06; 5) Fai-SR 37-14.12; 6) Fai-SR 37-14.41; 100260~|~1~|~1~|~01/MPO~|~Repair and resurface Lakeside Avenue using MPO STP funding. 91020~|~1~|~1~|~01/STR~|~SFN 505011 MAHONING RD OVER CHARLIE RUN.SFN 5034019 BEDELL RD OVER MILL CREEK. 91020~|~1~|~3~|~03/BRO~|~SFN 5054397 LAKE PARK BLVD OVER MAHONING RIVER. SFN 5052246 LOWELLVILLE RD OVER YELLOW CREEK. SFN 5058589 US62 OVER MAHONING RIVER AND RR. 91020~|~1~|~2~|~02/S>2~|~SFN 5058457 POWERSWAY OVER PINE HOLLOW RUN. 25012~|~1~|~1~|~01/NHS~|~Resurface the ixisting roadway and other roadway related items on LOG US 33 from SLM 10.74 to 15.67. 25012~|~1~|~3~|~03/NHS~|~Bridge deck overlay and patching on SFN 4600398 LOG 33 11.92 L Branch of Cherokee Run, SFN 4600428 LOG 33 11.92 R Branch of Cherokee Run, SFN 4600487 LOG 33 12.26 R Cherokee Run, SFN 4600452 LOG 33 12.26 L Cherokee Run, SFN 4600541 LOG 33 13.49 R Flat Branch Creek, SFN 4600606 LOG 33 14.68 R TWP RD 56, SFN 4600576 LOG 33 14.68 L TWP RD 56; SFN 4600630 LOG 33 15.21 L TWP RD 217; SFN 4600665 LOG 33 15.21 R TWP RD 217; SFN 4600819 lOG 33 15.33 R Penn Central RR; SFN 4600789 LOG 33 15.33 L Penn Central RR. 25012~|~1~|~2~|~02/BRO~|~Deck patching and overlay on SFN 4600517 LOG 33 13.49over Flat Branch Creek. 106218~|~1~|~1~|~01/NHS~|~Area enhancements to include brick pavers, seating walls and lighting on Colonel Glenn Highway in the City of Beavercreek. 102409~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 6.02 to 11.87 102409~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings for work zone and permanent applications 95751~|~1~|~2~|~02/S>2~|~LUC-295 @ SLM 6.59 95751~|~1~|~3~|~03/S>2~|~Urban section from SLM 7.60 to SLM 8.91 95751~|~1~|~1~|~01/STR~|~LUC-295 from SLM 2.47 to SLM 7.6, then from SLM 8.91 to SLM 9.69. 95751~|~1~|~4~|~04/STR~|~Bridge split for Luc-295-3.91 93506~|~1~|~1~|~01/NFA~|~Sanitary tie in at the SUM - Twinsburg outpost. 100970~|~1~|~1~|~01/STR~|~Chip sealing ATB SR 7 from 2.37 to 6.98ATB SR 45 from 11.06 to 11.50MAH SR 14T from 0.00 to 0.91TRU SR 88 from 22.76 to 23.73. 92870~|~1~|~1~|~01/S<2~|~"01/S<2/OT/ " - Geological Site Management 4SF7 (80% Federal) / 4SS7 (20% State) - No CAP - Drilled Shaft Wall GUE-SR 209-07.48-07.56 111071~|~1~|~1~|~01/STR~|~Plan split for slide repair 96732~|~1~|~1~|~01/STR~|~Preventive Maintenance - Chipseal 83045~|~1~|~1~|~01/IMS~|~Plan Split for SUM IR 77 22.32 to 24.20. 115265~|~1~|~1~|~01/NHS~|~Rehabilitate FRA-33-0379 structure (SFN 2501171) over the Scioto River 112497~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 121613~|~1~|~1~|~01/NFP~|~Debris cleanup 114572~|~1~|~1~|~01/STR~|~Chip Seal 114572~|~1~|~2~|~02/NFA~|~Chip Seal existing pavement 101086~|~1~|~1~|~01/STR~|~Overlay US 36 in Darke & Miami County from Greenville to Covington: DAR US 36 SLM 14.79 to 22.76 = = MIA US 36 SLM 0.00 to 3.92 101086~|~1~|~2~|~02/S<2~|~Overlay US 36 in Darke & Miami County from Greenville to Covington: DAR US 36 SLM 13.59 to 14.79 101086~|~1~|~3~|~03/NHS~|~Overlay US 36 in Darke & Miami County from Greenville to Covington: DAR US 36 SLM 13.39 to 13.59 113250~|~1~|~2~|~02/NFP/KENT~|~Work funded 100% by the City of Kenton 113250~|~1~|~3~|~03/S<2~|~For work inside of the Kenton Urban Area but outside of the City of Kenton. The right side of SR 31 from the beginning of the work at SR 292 until SR 31 enters the City of Kenton on the right side at 10.298. All funds will be provided by the District. 113250~|~1~|~1~|~01/S<2/KENT~|~Resurfacing on SR 31, SR 53 and SR 67 in the City of Kenton in Hardin County. All the resurfacing on SR 53 and SR 67. On the left side of the road on SR 31 from the beginning of the work at SR 292 until SR 31 enters the City of Kenton on the right side at 10.298 and then on both sides of SR until the end of the work at Espy at 11.142. 80% federal funds from the District budget with the 20% match provided by the City of Kenton. 92163~|~1~|~1~|~01/STR~|~Culvert replacement at SLM 7.65 91837~|~1~|~1~|~01/STR~|~General system asphalt overlay of SR 164; includes asphalt overlay, pavement repairs and pavement marking 81222~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7 (80%)/4PS7 (20%) - No CAP - Resurfacing of LIC SR 310 9.96 to 13.45. 102535~|~1~|~1~|~01/NHS~|~This plan split is for the work on US 50 in HAM County a NHS route. 99976~|~1~|~1~|~01/ERD~|~Construct turn lanes to the US 250 WB/IR 77 NB off ramp, the IR 77 SB off ramp and on the SR 39 approach at the CR 21 intersection at the interchange of IR 77, US 250 and SR 39 near New Philadelphia. Optimize the traffic signal timing and phasing of the traffic signals along the SR 39 corridor at the interchange of IR 77, US 250 and SR 39 near New Philadelphia. 96862~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various County roads in Medina County. 103716~|~1~|~1~|~01/NHS~|~NHS Pavement 80/20 Fed/City 103716~|~1~|~2~|~02/NHS~|~NHS Pavement 100% City of Brunswick 103716~|~1~|~3~|~03/NHS~|~NHS Pavement 80/20 Fed/State District Allocation 96354~|~1~|~1~|~01/SAF~|~Provide signing, striping, and curb ramp upgrades at the intersections of Oliver & Hilltop Elementary School Entrance, SR-4 & Wyoming, SR-4 & Worthington, Worthington & Beech and the mid-block crossing of Wyoming east of SR-4. 100650~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of SR 73. This is between SLM 7.2-11.19 and 14.29-20.05 100650~|~1~|~2~|~02/S>2~|~Plan split for the section of SR 73 in the large urban area and not a NHS route. This is between SLM 11.19-14.29 100650~|~1~|~3~|~03/SAF~|~For construction of an eastbound left-turn lane onto Old 73 entering Waynesville. 97430~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on roads within Medina County. 112783~|~1~|~1~|~01/IMS~|~Resurfacing. 112783~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance > 20' span. 97903~|~1~|~2~|~02/NHS~|~CR 627 (NC 038) roadway reconstruction including the removal and replacement of the existing pavement, curb, walk and street lighting. The street section will be changed from four lanes to three lanes with bike lanes, wider sidewalks and street lighting. 97903~|~1~|~1~|~01/S>2~|~CR 627 (OC 038) roadway reconstruction including the removal and replacement of the existing pavement, curb, walk and street lighting. The street section will be changed from four lanes to three lanes with bike lanes, wider sidewalks and street lighting. 111521~|~1~|~1~|~01/NFA~|~Replacement of structure > 20' span. 116098~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in POR, STA and SUM Counties. 76804~|~1~|~1~|~01/IMS~|~100% UNFU plan split 105628~|~1~|~1~|~01/IMS~|~plan split 102607~|~1~|~1~|~01/NFA~|~Salt and Storage Buildings - Facilities Funds 86703~|~1~|~1~|~01/STR~|~Brdg Replacement On SR136, 0.01 mile south of intersection with TR269 (Berry Road), it is proposed to replace a deteriorating and structually deficient CMPA with a pre-cast concrete box. 0103551 24.600 80/20 split01/STR/BR/State 102670~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 8803242. 116595~|~1~|~1~|~01/IMS~|~Interstate Plan Split 100063~|~1~|~1~|~01/BRO~|~Bridge Deck Repair and OverlayBridge on System Eligible 96714~|~1~|~1~|~01/NFP~|~ODNR funded project. Road repairs and chip seal at VIN Tar Hollow State Forest. Non federal aid project funded 100% state. 112985~|~1~|~1~|~01/NHS~|~Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures. 116271~|~1~|~1~|~01/STR~|~FY26 Micro 116271~|~2~|~2~|~02/NHS~|~FY26 Micro. 116271~|~3~|~3~|~03/S<2~|~FY26 Micro 110950~|~3~|~3~|~03/NHS~|~Split for paving work on the NHS using MPO and urban paving funds (SR-44 & US-6DA) 110950~|~1~|~1~|~01/S5K~|~Split for paving on the General System STP 110950~|~1~|~2~|~02/S5K~|~Paving work on the STP system (US-6). 110950~|~1~|~4~|~04/NFP~|~Plan split for resurfacing of parking area around Chardon square at 100% local cost. 100892~|~1~|~1~|~01/STR~|~SCI 139 15.00 (SFN 7303939) 87079~|~1~|~1~|~01/STR~|~Replace two deteriorating bridges, a steel truss and a steel beam, which share a common pier and currently function as one bridge. The replacement will be one structure. SFN 1255371 CLA CR 351 3.03 and SFN 1255304 CLA CR 351 3.02. 106330~|~2~|~2~|~02/NHS~|~US-20 resurf. 106330~|~1~|~1~|~01/SAF~|~Safety funded Plan split for left turn lane 106330~|~1~|~3~|~03/SAE~|~Plan split costs associated with wet pavement markings. 107076~|~1~|~1~|~01/NFA~|~PIK CR VAR PM 96967~|~1~|~1~|~01/IMS~|~Guardrail maintenance and repair on various routes. 94401~|~1~|~7~|~07/STR~|~STP Rural Bridge Work: RIC-39-9.67 94401~|~1~|~5~|~05/SAF~|~Safety Project - Realign Lexington Springmill Rd, increase wearing surface friction on RIC-39-9.67 structure. 94401~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: RIC-39-7.17-9.86/ RIC-309-1.05-1.61100% 7BPB 1st priority 80/20 4PF7/4PS7 2nd priority 94401~|~1~|~2~|~02/S<2~|~Split Corp Resurfacing (Galion):RIC-309-0.00-0.13 LT RIC-SR-0309-0.26-0.27 LT City of Galion80/20 4PF7/4BG7 1st priority 94401~|~1~|~3~|~03/S<2/MANS~|~Resurfacing - 80/20 4PF7/4BG7 Federal/Local District Preservation/City of Mansfield. RIC-SR-0039-10.26-12.00-City of Mansfield on RT, 12.00-12.07-City of Mansfield on LT, 12.07-12.11 Full Corp of City of Mansfield, 12.11-12.14- City of Mansfield on LT, 12.18-12.22 City of Mansfield LT, 12.22-12.25 City of Mansfield RT. 94401~|~1~|~4~|~04/S<2/MANS~|~Resurfacing - 100% 4BG7. RIC-SR-0039-10.26-12.00-City of Mansfield on RT, 12.00-12.07-City of Mansfield on LT, 12.07-12.11 Full Corp of City of Mansfield, 12.11-12.14- City of Mansfield on LT, 12.18-12.22 City of Mansfield LT, 12.22-12.25 City of Mansfield RT. 94401~|~1~|~6~|~06/S<2~|~RIC-SR-0309-00.00-00.13 RT, 00.13-00.26, 00.26-00.27 RT, 00.27-01.05, 01.61-03.91, RIC SR 39-05.86-07.17,9.86-10.26, 10.26-12.00, 12.00-12.07 RT, 12.11-12.14 LT, 12.14-12.18, 12.18 -12.22 RT, 12.22-12.25 LT, 12.25-13.15 1st Priority 100%-7BPB funds, 2nd Priority 100%-4PS7 funds. 116154~|~1~|~2~|~02/NFP/DEFI~|~100% city cost items. 116154~|~1~|~1~|~01/S5K~|~Resurfacing in the City of Defiance. Funding will be 80% federal from the District Preservation Program budget with the 20% match provided by the City of Defiance. 87394~|~1~|~1~|~01/NHS~|~SCI US23, 2.60 Slide Repair Located at portsmouth corp limit 2.60 miles north of Ohio River 80 Fed/20 State 100336~|~1~|~1~|~01/STR~|~This is a placeholder plan split entered so that funding can be entered. The project will need more than one split. The actual splits will be determined later. 87264~|~1~|~1~|~01/NHS~|~Concrete Pavement Repair project. MEG US 33 13.32-24.31. NHS route funded 80 federal/20 state. 87264~|~1~|~2~|~02/SAF~|~Installation of centerline and edgeline rumble stripes on MEG 7 14.58-18.64. Safety funded. 105876~|~1~|~1~|~01/S>2~|~Multiuse path in the City of Moraine. 114980~|~1~|~1~|~01/IMS~|~Field pave culvert invert 114980~|~1~|~2~|~02/STR~|~Spray applied structural liner 108749~|~1~|~2~|~02/S5K/MAR~|~100% Local Plan Split - Work to include Curb Ramps, Pavement Repairs and Sidewalks 108749~|~1~|~1~|~01/S<2~|~All items of work associated with resurfacing of SR-95 and SR-309, excluding the 100% locally funded items. 107989~|~1~|~1~|~01/NHS~|~Partial depth replacement and resurfacing of the roadway surface as well as new thermoplastic lane traffic striping, raised pavement markers. 107989~|~1~|~2~|~02/MPO~|~Locally funded curb repairs. 100489~|~1~|~1~|~01/STR~|~ROS 180 (11.67-11.96) Village of Adelphi 93436~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Portage Path to Hawkins in the City of Akron. 90355~|~1~|~1~|~01/STR~|~Culvert Replacement 116786~|~1~|~1~|~01/NHS~|~Resurfacing plan split 80406~|~1~|~1~|~01/IMS~|~Split for the pavement portion of the project 80406~|~1~|~2~|~02/IMS~|~Split for the bridge portion of the project. 101260~|~1~|~1~|~01/IMS~|~Plan Split 01 associates with IR routes 70 and 670. 102249~|~1~|~1~|~01/STR~|~CR 175 Rural section 0.00 to 2.22, then from 4.93 to end. Rural Minor Collector 102249~|~1~|~3~|~03/STR~|~County Road 175 between 4.63 to 4.93. Rural Major Collector. 102249~|~1~|~2~|~02/S<2~|~County Road 175 between slm 2.22 and 4.63. - URBAN Sections 105246~|~1~|~1~|~01/STR~|~Crack Sealing for District 11 98718~|~1~|~1~|~01/BRF~|~Structure replacement HUR-TR 183-2.79 (Chenango Rd). 113103~|~1~|~1~|~01/NFA~|~Bridge replacement project over the west branch of Sunday Creek in the Village of Glouster. ATH Embrey Street, SFN 0566276. Funded 95% Federal (15% TRC)/5% Local. 98229~|~1~|~2~|~02/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the National Highway System (NHS) Routes in District 5; Cos-16-0.00 to 7.40, Cos-36-19.06 to 19.47, Cos-36-19.47 to 26.49, Cos-16-7.40 to 8.93, Gue-22-10.28 to 15.16, Lic-13-12.06 to 13.98, Lic-79-4.11 to 4.18, Lic-79-4.60 to 6.56, Mus-16-0.00 to 11.58, Mus-16-11.58 to 14.86. 98229~|~1~|~5~|~05/NFA~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the (NFA) Routes in District 5; Cos-621-0.00 to 5.98, Cos-643-0.00 to 10.81, Cos-751-4.01 to 11.42, Gue-209-0.00 to 7.07, Gue-285-9.47 to 13.46, Gue-313-0.00 to 1.24, Gue-340-0.00 to 0.86, Gue-672-0.00 to 2.74, Kno-205-0.26 to 6.94, Kno-308-0.96 to 1.32, Kno-308-2.18 to 3.00, Kno-657-0.00 to 4.93, Lic-657-0.86 to 14.91, Mrg-555-26.73 to 27.16, Mus-208-1.03 to 11.06, Mus-209-0.00 to 1.64, Mus-284-0.00 to 13.36, Mus-313-0.00 to 7.13, Mus-340-0.00 to 3.64, Mus-376-0.00 to 5.30, Mus-555-0.00 to 4.02, Non-340-0.00 to 0.71, Nob-672 0.00 to 0.37, Per-204-10.00 to 3.77, Per-555-0.74 to 3.77 98229~|~1~|~6~|~06/S>2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the OFAH-Urban routes in the Columbus Area Routes; Lic-310-0.96 to 1.72. 98229~|~1~|~1~|~01/IMS~|~District Preservation Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the Interstate Routes in District 5: Gue-70-0.00 to 6.55, Gue-70-22.80 to 28.48, Gue-77-0.00 to 2.50, Gue-77-11.70 to 17.70, Lic-70-0.00 to 9.65, Lic-70-28.93 to 29.42, Mus-70-0.76 to 5.56. 98229~|~1~|~3~|~03/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the S<2 Routes in District 5; Cos-36-18.95 to 19.06, Cos-83-7.99 to 8.05, Cos-83-8.05 to 8.32, Cos-83-8.32 to 8.59, Fai-22-11.74 to 13.16, Fai-204-13.86 to 15.22, Fai-204-15.22 to 16.08, Fai-360-0.00 to 1.72, Gue-22-9.28 to 10.28, Gue-209-7.07 to 7.64, Gue-209-10.78 to 13.55, Kno-36-14.17 to 16.80, Kno-36-20.82 to 20.85, Kno-308-1.32 to 2.18, Kno-661-6.10 to 7.41, Kno-768-0.48 to 1.70, Lic-37-16.82 to 17.29, Lic-79-1.24 to 2.04, Lic-79-4.08 to 4.11, Lic-79-16.25 to 17.19, Lic-360-0.00 to 0.22, Lic-657-0.00 to 0.86, Lic-661-1.70 to 1.79, Mus-22-1.17 to 8.95, Mus-93-3.45 to 4.72, Mus-146-16.21 to 17.55, Mus-555-8.60 to 11.18. 98229~|~1~|~4~|~04/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the STR Routes in District 5; Bel-265, 0.00 to 0.41, Cos-79-0.00 to 12.37, Cos-83-0.00 to 7.99, Cos-83-8.59 to 9.02, Cos-541-0.00 to 8.59, Cos-651-0.00 to 3.04, Cos-751-0.00 to 4.01, Fai-22-10.75 to 11.74, Fai-204-11.16 to 13.86, Fai-204-16.08 to 19.13, Fai-310-0.00 to 0.52, Fai-664-7.47 to 12.62, Gue-83-0.00 to 0.53, Gue-83-1.13 to 11.29, Gue-146-0.00 to 1.70, Gue-146-2.83 to 9.86, Gue-265-4.59 to 17.63, Hol-651-0.00 to 0.50, Kno-36C-0.00 to 0.12, Kno-36 -10.14 to 14.17, Kno-36-20.85 to 29.50, Kno-205-0.11 to 0.26, Kno-514-0.26 to 7.93, Kno-541-0.21 to 8.92, Kno-661-0.00 to 6.10, Lic-61-10.57 to 18.44, Lic-62-19.79 to 20.64, Lic-37-17.29 to 25.08, Lic-79-0.00 to 1.24, Lic-79-17.19 to 33.10, Lic-310-0.00 to 0.96, Lic-661-1.79 to 14.81, Mus-22-0.00 to 1.17, Mus-93-0.00 to 3.45, Mus-146-17.55 to 33.76, Mus-555-4.02 to 8.60, Mrg-555-23.06 to 23.75, Nob-265-0.00 to 0.32, Per-13-0.00 to 17.42, Per-37-15.06 to 20.69, Per-93-2.16 to 3.90, Per-93-17.89 to 27.10, Per-155-0.00 to 7.45, Per-216-0.00 to 1.60, Per-555-3.77 to 4.33, Per-595-0.00 to 2.10. 116881~|~1~|~1~|~01/S>2~|~Resurfacing 111376~|~1~|~1~|~01/NFP~|~The Ashtabula TID will reconstruct as well as widen areas along E 5th St and Parkgate Ave in the City of Ashtabula. 111376~|~1~|~2~|~02/NFP~|~Reconstruct as well as widen E 5th St. 99604~|~1~|~1~|~01/BRO~|~Repair structures HOL 60 0441 (SFN 3800784) and HOL 515 0397 (SFN 3802620) by replacing the existing asphalt overlay with a new rigid concrete overlay. 100335~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code 88985~|~1~|~1~|~01/STR~|~HIG SR138 22.89 - 32.10 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Pave thru brdgs:3603180 HIG SR138 23.62 Intersect: Trib Of Rattlesnake Crk3603334 HIG SR138 29 Intersect: Opossum Run3603369 HIG SR138 30.98 Intersect: Opossum Run3603393 HIG SR138 31.5 Intersect: Duncan RunSkip SFN 360324580/20 split01/STR/PV/State3603229 HIG SR138 24.22 Intersect: Big Branch3603423 HIG SR138 31.64 Intersect: Sugar Creek3603466 HIG SR138 32.55 Intersect: Greenfield Shortline 88985~|~1~|~2~|~02/S<2~|~HIG SR138 32.10 - 32.48 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Skip SFN 360324580/20 split01/STR/PV/State 88985~|~1~|~4~|~04/S<2~|~HIG SR138 22.93 - 32.79 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Brdg for rehab:3603466 HIG SR138 32.55 Intersect: Greenfield Shortline80/20/split01/S<2/BR/State 88985~|~1~|~3~|~03/STR~|~HIG SR138 22.93 - 32.79 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Brdgs for rehab:3603229 HIG SR138 24.22 Intersect: Big Branch3603423 HIG SR138 31.64 Intersect: Sugar Creek80/20/split01/STR/BR/State 91373~|~1~|~1~|~01/MPO~|~Resurface the Richland County Bike Trail from the Village of Lexington to the Village of Butler 103505~|~1~|~1~|~01/SAF~|~Improve intersection of Southbound exit from I71 to eastbound SR126 by installing a signal and reconfiguring eastbound SR126 to separate traffic bound for I71 from eastbound SR 126 traffic. 103505~|~1~|~2~|~02/SAF~|~Bridge rehab 107491~|~1~|~2~|~02/S5K~|~Federal/State 80/20% Urbanized Area Outside Corp. Limit (Paving Items): ASD US 42 4.932 to 6.547, 6.730 to 7.006, 7.132 to 7.537, 9.054 to 9.39 107491~|~1~|~3~|~03/S5K~|~Federal/Local 80/20% Urbanized Area Inside Corp. Limit (Paving Items):ASD US 42 3.799 to 4.932, 6.547 to 6.730, 7.006 to 7.132, 7.537 to 7.850, 8.923 to 9.054ASD-96-3.905 to 5.446 107491~|~1~|~4~|~04/S5K~|~100% Local : Urbanized Area Inside Corp. (100% City Items, Pavement Repairs, Curb Ramps, Curb Repair etc.):ASD US 42 3.799 to 4.932, 6.547 to 6.730, 7.006 to 7.132, 7.537 to 7.850, 8.923 to 9.054ASD-96-3.905 to 5.446 107491~|~1~|~1~|~01/NHS~|~Federal/State 80/20% Urbanized Area Outside Corp. Limit (Paving Items):ASD-42-8.042 to 8.547 107491~|~1~|~5~|~05/NHS~|~Federal/State 80/20% Urbanized Area Inside Corp. Limit (Paving Items): ASD-42-7.937 to 8.042 / 8.546 to 8.923 107491~|~1~|~6~|~06/SAE~|~Safety application for supplemental signal heads on ASD-42 at King Road . 116331~|~1~|~1~|~01/IMS~|~Plan split for the resurfacing on HAM-71 13567~|~1~|~1~|~01/BRO~|~Plan split for replacement of the existing 4 lanes at 90/10 fed/state participation. (no added capacity) 13567~|~1~|~2~|~02/BRO~|~Plan split for work adding additional 2 lanes funded at 80/20 fed/state participation. (added capacity) 115858~|~1~|~1~|~01/MPO~|~Resurfacing project in the City of Wooster - Large City Funds 95294~|~1~|~1~|~01/IMS~|~Work at DEL-71-0.03 95294~|~1~|~2~|~02/IMS~|~Work at FRA-270-27.45 121291~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing. 91836~|~1~|~1~|~01/NFA~|~General System asphalt overlay on BEL-26-0.00 to 7.19; includes pavement repairs and pavement marking 91836~|~2~|~2~|~02/STR~|~General System asphalt overlay on BEL-148-0.00 to 12.02; includes pavement repairs and pavement marking 96206~|~1~|~1~|~01/NFA~|~Constructing road imporvements to support an expansion of KTH Industries Manufacturing Plan; specifically, extending an existing northbound tapered right turn lane on SR 235 into KTH/s St. Paril Plant. 102373~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. NOB 566 1.59-4.80. Not on any federal aid system funded 100% state. 102373~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment on NOB 78 7.91-9.63. Urban other federal aid funded 80 federal/20 state. 102373~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on NOB 78 7.57-7.91, 9.63-21.35 and NOB 566 0.00-1.59. Rural other federal aid funded 80 federal/20 state. 115951~|~1~|~1~|~01/S<2/CAMB~|~City of Cambridge Oil & Shale Program Funding - 4SH7 (100% State) - See CAP Comment - Foe resurfacing and related roadway work along MR 345. 114404~|~1~|~1~|~01/NFP~|~All work in this project. 93837~|~1~|~1~|~01/STR~|~Culvert replacement project on VIN US 50 20.68, SFN 8200483. Rural other federal aid funded 80 federal/20 state. 91408~|~1~|~1~|~01/STR~|~Brdg Replacement. 0101567 ADA SR41 31.31 Intersect: Crooked Run CreekNorth of intersection of SR41 & SR73. 80 Fed/20 State. BR funds eligible but only for rehab, not replace. 01/STR/BR/State 113833~|~1~|~1~|~01/NFP~|~ITS Camera and lowering unit replacements. 112555~|~1~|~1~|~01/SAF~|~Added CEAO safety funded plan split 110087~|~1~|~1~|~01/STR~|~MAD 142 from 11.44 to 13.05 95786~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 2.54 95786~|~1~|~2~|~02/NHS~|~from SLM 2.54 to SLM 4.34 95786~|~1~|~3~|~03/SAF~|~Center Line rumble stripes from 0.00 to 0.72; and from 2.54 to 4.34 95786~|~1~|~4~|~04/NFA~|~Adding event for retroactive fuel price adjustment 113296~|~1~|~1~|~01/MPO~|~Plan Split for MPO-funded resurfacing work. 109081~|~1~|~1~|~01/NFP~|~Construction of Cold Storage Building for Riveredge, Cuyahoga County. Project DOT-190018 97312~|~1~|~1~|~01/STR~|~ADA CR 100 0.00 - 7.95ADA CR 400 1.90- 6.96 96330~|~1~|~1~|~01/STR~|~It is proposed, on SR506 from SR753 (SLM 0.00) to SR124 (SLM 4.34) & on SR753 from SR41 (SLM 0.00) to US50 (SLM7.10), to resurface the highway with asphalt concrete. 96690~|~1~|~2~|~02/NHS~|~PLan Split for roadway work added to the project. Project limits are SLM 10.97 to 14.11. 96690~|~1~|~1~|~01/NHS~|~Plan split to cover the costs of the bridge and roadway appurtances (Guardrail, approach slabs, embankment, etc. incidental to bridge BUT-27-14.02.). Roadway work to be covered in separate split. 104260~|~1~|~1~|~01/NFP~|~MOWING 105522~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 97018~|~1~|~1~|~01/IMS~|~SFNs 4805909, 4805917, 6201628 119136~|~1~|~1~|~01/NFA~|~Raised Pavement Markings. 95506~|~1~|~1~|~01/S>2/PICK~|~District Preservation Urban Paving Funding - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Resurfacing on Fai-SR 204-00.00 to 00.36 in the City of Pickerington 95506~|~1~|~2~|~02/S>2~|~District Preservation Pavement Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-SR 204-00.36 to 06.93; 2) Fai-SR 204A-00.00 to 00.49; 95506~|~1~|~3~|~03/STR~|~District Preservation Pavement Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-SR 204-06.93 to 11.16; 95506~|~1~|~4~|~04/S>2~|~District Preservation Other Funding - 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Reconstruction of signal at SR 204 and Harmon Road (TR221) 105838~|~1~|~1~|~01/IMS~|~All items associated with crack sealing on I-71 and US-23. 105249~|~1~|~1~|~01/STR~|~Resurfacing. 105667~|~1~|~1~|~01/NHS~|~BRO 32 7.43 Invert PavingROS 35 9.28 Invert Paving 81078~|~1~|~1~|~01/IMS~|~Bridge Maintenance 93346~|~1~|~1~|~01/BRO~|~Brdg Replacement. On SR348, approximately 3.34 miles west of SR781. 0104299 ADA SR348 9.15 Intersect: Parker Hollow Stream 80 Fed/20 State. 01/BRO/BR/State 93801~|~1~|~1~|~01/SAF~|~Safety Project on US68 in Mt. Orab.In the Village of Mt. Orab on US68 from Sterling Run Blvd to Hughes Blvd, it is proposed to add left turn lanes on US68 at both SR32 ramp intersections and coordinate the signaels with adjacent signals. Add right turn lane on SR32 eastbound off ramp at it intersections with US68.US68 30.72 - 31.33 & SR32 4.96 - 5.44 89230~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all bridge work: 4305884 89230~|~1~|~2~|~02/NFP~|~Split for Dominion East Ohio gas line supports on the new structure. 89347~|~1~|~1~|~01/ENH~|~Renovation of historic steam powered sternwheel tow boat. Owned by Ohio Historical Society leased to Commissioners. 80% Federal/20% Local. TEA - Enhancement program. 95961~|~1~|~1~|~01/NFP~|~New 60' x 150' fabric salt building at 6100 tons. 121397~|~1~|~1~|~01/NFP~|~FY25-27 123600~|~1~|~1~|~01/SAF~|~Safety and speed management improvements. 92431~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6403484 PER SR669 1.22 Intersect: Center Branch Of Rush Cr; Not BR Eligible for Replacement: Length=31 SD/FO(1) SR=65.2 DSR=5 118578~|~1~|~1~|~01/NFP~|~Established Plna Split 01/NFP/PV 123269~|~1~|~1~|~01/NFP~|~Pruning. 122456~|~1~|~1~|~01/STR~|~UNI SR 47: Work necessary to alleviate drainage issues. 75466~|~1~|~1~|~01/STR~|~0803332 BRO SR353 0.65 Intersect: Red Oak Creek80 Fed/20 State. 01/STR/BR/State 96755~|~1~|~1~|~01/NHS~|~NHS roadway 96755~|~1~|~2~|~02/NHS~|~Bridges OTT-2-2725 & OTT-2-2757 96755~|~1~|~3~|~03/NHS~|~Plan split for beam straightening work due to impact damage to the fascia girder on OTT-269-0154 98489~|~1~|~1~|~01/STR~|~Salt Creek Restoration project. 103084~|~1~|~1~|~01/NFA~|~The City is constructing road improvements to support an expansion for Green Tokai Co. to relocate their mixing facility: specifically extending Parker Avenue 268' with curb and storm drains conforming to the existing street widths to allow access to the new building addition and shipping and receiving dock area. 122851~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded scope. 87163~|~1~|~1~|~01/IMS~|~Priority system paving of FRA-71: 0-5.29 89140~|~1~|~1~|~01/BRF~|~3632954 HIG TR280 0.28 Intersect: Little Rock Creek CEAO 80 Fed/20 Local Match Highland County 01/BRF/BR/High 118469~|~1~|~1~|~01/BRF/PCEO~|~Replacement of the superstructure of Bridge PRE-TR 317-4.55 (SFN: 6832695) 106565~|~1~|~1~|~01/NHS~|~Repair damage from vehicle strike on NHS bridge. 115565~|~1~|~1~|~01/BRF~|~Replace SCI-CR 33-0.19 (SFN 7330979) under the OBPP. 94072~|~1~|~1~|~01/IMS~|~Interchange highway lighting replacement at BEL-70-20.00 (Mall Road), BEL-70-20.37 (Banfield Road) and at BEL-70-21.34 (IR 470) using 90/10 4PF7/4PS7 funding sac split. 102886~|~1~|~1~|~01/NHS~|~Plan Split for the roadway portion of the project 102886~|~1~|~2~|~02/NHS~|~Rehab 3113841 by repalcing joints, painting, sealing super/sub, and patching sub. Rehab 3113884 by replacing parapets, joints and sealing uper/sub. 102886~|~1~|~3~|~03/NHS~|~MAJOR BRIDGE- Rehab 3113914 by replacing barrier, joints, and sealing super. 102886~|~1~|~4~|~04/SAF~|~Sign replacement 102886~|~1~|~5~|~05/SAF/NORW~|~The City of Norwood funding request the existing cobra heads with new LED heads. The plan split is for all construction work associated with the replacement of the light fixtures. 102886~|~1~|~6~|~06/NHS~|~Plan Split for the added Work Zone Queue Detection 102886~|~1~|~7~|~07/IMS~|~Added Funding (Plan Split 7) during construction for the two ramp bridges (HAM-71-0804R (SFN:3115062) and HAM-71-0820S (SFN:3115119) that are to/over I-71. These were to be sealed with another project but were added to this one due to the ramps being closed. 92157~|~1~|~1~|~01/BRF~|~4863690 LUC MASHB 0.08 M. N. OF SYL.-MET.Intersect: TENMILE CREEK 0004 109932~|~1~|~1~|~01/SAF~|~"01/SAF/PV/GRAN" - safety improvement along Newark-Granville Road (CR 539). 88124~|~1~|~1~|~01/IMS~|~Pavement- reconstruction (maintaining the existing). 88124~|~1~|~2~|~02/IMS~|~Pavement - added capacity for the new 4th lane in each direction. 88124~|~1~|~3~|~03/IMS~|~Bridge - reconstruction (maintain the existing). 88124~|~1~|~4~|~04/IMS~|~Bridge - added capacity for the new 4th lane in each direction. 107097~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of SFN 2302047 located at Fai-SR 159-07.90 110056~|~1~|~1~|~01/NHS~|~NHS Plan Split: MAR-23-10.62-15.02 93585~|~1~|~1~|~01/S<2/HANO~|~"01/S<2/OT/HANO" - Safe Route To Scool Funding 4SC7 (80% Federal) / 4BG7 (20% Local) with TRC Authorized - CAP $292,000 minus $33,837 in PE equals $258,163 remaining for Construction - Village of Hanover SRTS sidewalk project constructing 3,057 feet of sidewalk along Hainsview Drive and connecting sidewalks to Licking Valley Elementray School 123799~|~1~|~1~|~01/NHS~|~nhs 91412~|~1~|~1~|~01/STR~|~ADA SR348, SFN 0104388, 12.10 Intersect Groundhog Hollow StreamBrdg Replacement80 Fed/20 State. 01/STR/BR/State 97481~|~1~|~1~|~01/NFP~|~Culvert replacement at CFN TBD ATB-20-3.92 and CFN 040460410 ATB-46-9.80. 83324~|~1~|~1~|~01/BRF~|~Removal and replacement of existing single span steel truss bridge with a 110 feet long, 32 feet wide prestressed concrete box beam structure SFN 553342 MIA CR 81 0175 119021~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funded using SAC 4PS7. 113601~|~1~|~1~|~01/S>2~|~Construct a roundabout at the intersection of Wooster Road and Beechmont Circle. 114187~|~1~|~1~|~01/NHS~|~Slide repair 97709~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/OT/KCEO" - Knox County installation of new guardrail and upgrade of existing utilizing CEAO funds with a max of $300,000 at 100%. 101158~|~1~|~1~|~01/STR~|~AC overlay with repairs:SHE SR 48 0.00 98588~|~1~|~1~|~01/STR~|~District Preservation Program funds. 94205~|~1~|~1~|~01/NFP~|~Construct Warren County Full Service Facility 113007~|~1~|~1~|~01/STR~|~Replace bridge GRE-72-0771 which carries SR 72 over Caesar Creek in Jamestown, Ohio 101026~|~1~|~2~|~02/NHS~|~Plan Split for the NHS locations within the project. 101026~|~1~|~1~|~01/IMS~|~Plan split for the interstate locations 101026~|~1~|~4~|~04/STR~|~Plan Split for the Rural locations within the project 101026~|~1~|~5~|~05/NFA~|~Plan Split for the locations not on a Federal Aide System route 101026~|~1~|~3~|~03/S>2~|~Plan Split for the Large Urban locations within the project 84222~|~1~|~1~|~01/MPO~|~Reconstruction of New Germany-Trebein Road from Golf Course Drive to .13 mi. east of Wyndham Drive to correct the existing substandard pavement width and to improve sight distance by widening to three lanes. 101031~|~1~|~1~|~01/IMS~|~Systematic Sign Replacement on CLI-71, GRE-71, HAM-275, HAM-74 122512~|~1~|~1~|~01/IMS~|~Emergency Bridge Hit 90924~|~1~|~1~|~01/NFA~|~Sidewalks 123817~|~1~|~1~|~01/BRO~|~Plan split for all bridge work on WOO-75-0301 & WOO-75-1019 bridges 98567~|~1~|~2~|~02/S<2~|~Resurfacing on PRE-127 near Eaton; from SLM 14.71-15.46 98567~|~1~|~1~|~01/STR~|~Plan split for the related pavement work/resurfacing on the rural portion of US 127 in Preble County. Between SLM 15.46 - 23.78 106701~|~1~|~1~|~01/NFA~|~Asphalt resurfacing of ATH CR 107 from SR 13 to the Morgan County line. Total of .96 miles. FLAP funded. Funded 80 federal/20 local. 92100~|~1~|~1~|~01/MPO~|~An MPO funded project to construct a roundabout at LUC CR124 2.51-2.53/LUC CR128 2.02-2.04 103300~|~1~|~1~|~01/NFP~|~Split for pavement markings throughout the district. 114385~|~1~|~2~|~02/NFA~|~Established Plan Split 01/NFP/PV/ - 100% State 114385~|~1~|~1~|~01/STR~|~Established Plan Split 02/STR/PV/ - 80% Federal, 20% State 113732~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at CR7 (Walnut Creek Pike/Circleville-Groveport Road) and TR 39 (Bell Station Road) 103169~|~1~|~1~|~01/NHS~|~Resurfacing on Wayne Avenue in the City of Dayton 107730~|~1~|~1~|~01/STR~|~All work in this project. Federal and state District Preservation Program funds. 123259~|~1~|~1~|~01/SAF~|~Sign replacement. 103490~|~1~|~1~|~01/NFP~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 93152~|~1~|~1~|~01/BRF~|~Bridge replacement project. GAL TR 752 0.29 (SFN 2743531). Federal 80% and 20% Local. 96686~|~1~|~1~|~01/STR~|~Plan Split for costs associated with bridges PRE-35-1541 and PRE-35-1986 including approach roadway costs, guardrail, etc. specific to these two locations. 96686~|~1~|~2~|~02/S<2~|~Plan split for costs associated with bridge PRE-35-12.58 including approach roadway costs, gaurdrail, etc. specific to this location. 105411~|~1~|~1~|~01/STR~|~Bridge repair on rural route bridge. 105411~|~1~|~2~|~02/NFA~|~Bridge repair on bridges not on the Federal Aid System. 105948~|~1~|~1~|~01/SAF/PCEO~|~Perry County CEAO HSIP Funding - 4HB7 (Federal 100%) and ODOT HSIP Funding - 4HJ7 (Federal 100%) - See CAP Comment - Replacement of existing pavement marking on various county roads in Perry County. 84686~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds for the District budget SAC 4MP7. 124242~|~1~|~1~|~01/IMS~|~Plan split for all work to repair LUC-24-2498 bridge 120156~|~1~|~1~|~01/SAF/COSH~|~Signal reconstruction at Browns Lane/Second Street and Plaza Drive/Second Street intersections. 113534~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 16.38. Funded 100% State. 100961~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 100961~|~1~|~1~|~01/IMS~|~The treatment will be a 2? mill and fill using Superpave Interstate 70 in Montgomery County. MOT IR 70 SLM 6.71 to 10.41. 97202~|~1~|~1~|~01/SAF~|~Profile improvement and tree removal along SR 164 to improve the intersection sight distance at the SR 164 & SR 558 intersection. 105150~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 90% Federal (4PF7) / 10% State (4PS7) - No CAP - Rehabilitation of LIC-70-5.66 (SFN 4503066) carrying TR 152 over IR 70. 99022~|~1~|~1~|~01/SAF~|~District wide raised pavement markers 91490~|~1~|~2~|~02/S>2~|~FRA-317: SLM 15.96-16.15, FRA-710: SLM 0-4.06Columbus urban paving on STP routes 91490~|~1~|~3~|~03/NHS~|~FRA-317 SLM 16.15-16.70Columbus urban paving on NHS route 91490~|~1~|~1~|~01/S>2~|~FRA-317 SLM 15.93-15.96General system paving on STP route 102665~|~1~|~1~|~01/NFA~|~Landslide repair project. GAL 790 4.38. 101353~|~1~|~1~|~01/NHS~|~Seal concrete bridge decks on SR 7 in Belmont County 109607~|~1~|~2~|~02/ENH~|~Construct sidewalks and curb ramps 109607~|~1~|~1~|~01/S>2~|~Reconstruct the roadway 98690~|~1~|~1~|~01/NFA~|~CLA TR 98 4.83 (SFN 1244043) Newlove Road bridge replacement. This project will be to replace a deteriorating steel pony truss bridge on newlove Rd. over Beaver Creek. 92836~|~1~|~1~|~01/SAF~|~Intersection improvement 92836~|~1~|~2~|~02/SAF~|~100% Rural Lorian County Water Authority (RLCWA) funding responsibility 116623~|~1~|~1~|~01/MPO/STOW~|~Resurfacing. 120304~|~1~|~1~|~01/BRO~|~Clean and paint structural steel beams on bridge carrying US 36 over the Tuscarawas River. 118641~|~1~|~1~|~01/NFA~|~Vinton SR 328 8.97 160 ft Rockfall Hazard Remediation 94419~|~1~|~1~|~01/STR~|~Two Lane Resurfacing 94419~|~1~|~2~|~02/STR~|~Bridge work to be determined. 98285~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP ? deck overlay and other repairs on 1) 3001776 GUE-70-18.47 Intersect: IR 70 over TR 74; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=89.3 DSR=6; 2) 3001806 GUE-70-18.47 Intersect: IR 70 over TR 74; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=89.3 DSR=6; 83765~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7. 96568~|~1~|~2~|~02/STR~|~Resurfacing of TRU SR 305 from 2.45 to 7.88, 8.68 to 13.58 and 16.84 to 23.93, Resurfacing TRU SR 305D from 0.04 to 0.16. 96568~|~1~|~1~|~01/S>2/CORT~|~Resurfacing TRU-SR 305 from 15.28 to 15.49, Urban Paving in the City of Cortland. 96568~|~1~|~3~|~03/S>2~|~Resurfacing of TRU SR 305 from 7.88 to 8.68 and 13.58 to 16.84. 96568~|~1~|~4~|~04/NHS~|~Minor rehab to linked structure >20' span. 96568~|~1~|~7~|~07/STR~|~Minor rehab to linked structures 10' to 20' span. 96568~|~1~|~6~|~06/STR~|~Minor rehab to linked structures >20' span. 96568~|~1~|~5~|~05/S>2~|~Minor rehab to linked structure > 20ft span. 118768~|~1~|~1~|~01/NHS~|~Smooth Seal 117711~|~1~|~1~|~01/IMS~|~Plan split for resurfacing of interstate routes 117711~|~2~|~2~|~02/IMS~|~Plan split for approach slab jacking work on LUC-475-0254 bridge 117711~|~2~|~3~|~03/NHS~|~Plan split for resurfacing work on Dussel/Salisbury 105497~|~1~|~1~|~01/STR~|~Plan Split for Rural UNI 37 bridge 109375~|~1~|~1~|~01/NFA~|~ODNR Jackson Lake Resurfacing 120457~|~1~|~1~|~01/STR~|~Bridge replacement 97347~|~1~|~1~|~01/BRF~|~TR 221 2.33 Roberts Rd Brdg 89293~|~1~|~2~|~02/NHS~|~A partially funded urban paving project to resurface LUC US20 16.61-18.62 in the City of Maumee. This split is for the resurfacing from curb to curb at 50% and 50% local. 89293~|~1~|~1~|~01/SAF~|~A partially funded safety project to improve safgety access along LUC US20 16.61-18.62 in the City of Maumee. This split is for all costs other than roadway pavement (surface & Intermediate Courses) between curbs funded with safety funds @ 90% federal and 10% local. 118424~|~1~|~1~|~01/NHS~|~WAY US 0250 27.50 85152~|~1~|~1~|~01/NFA~|~Upgrade existing roadway by applying asphalt surface at Raccoon Creek Park in GAL Co. Work to be performed by purchase order contract. 76883~|~1~|~1~|~01/STR~|~This split is for resurfacing using rural STP funds. The entire lenght of SR 67 in this project in covered with this split. 104773~|~1~|~1~|~01/NFP~|~District wide fence replacements. 110706~|~1~|~2~|~02/SAF~|~Centerline rumble strips on SR 117 in Allen County and SR 53 in Wyandot County. 100% state funds from the Safety Program (SAC 4BC7) until the cap is reached then 100% state funds from the District Preservation Program (SAC 4PS7). 110706~|~1~|~1~|~01/STR~|~All resurfacing work in this plan split using district preservation allocations. 103811~|~1~|~1~|~01/S>2~|~Replace structurally deficient bridge in the City of Kettering. 101572~|~1~|~1~|~01/NFP~|~See linked culverts. 101572~|~1~|~2~|~02/NFP~|~Minor work to structure with 10' to 20' span. 85297~|~1~|~1~|~01/SAF~|~80/20 funding split using federal HSIP funds 93080~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 64.20. 100% State funded. 90215~|~1~|~1~|~01/S<2~|~Plan Split for Federal/Local Split for GH Drive Extension 93431~|~1~|~1~|~01/NHS~|~Priority System preventive maintenance on JEF-7-19.21 to 22.97; includes thin hot mix asphalt, pavement marking 123538~|~1~|~1~|~01/S>2~|~conduits linked 123538~|~1~|~2~|~02/NHS~|~conduit linked 123538~|~1~|~3~|~03/STR~|~conduit linked 117948~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ eligible multi-purpose trail work. 93686~|~1~|~1~|~01/S>2~|~Bridge repair of sfn# 7600682, STA-SR172-6.72 over SR-21. 96811~|~1~|~1~|~01/NFP~|~District 10 two-year mowing project for CY 2014-15 along Interstates and Interstate look-a-likes district wide. Funded 100% state. 124367~|~1~|~1~|~01/NFA~|~Created for J&C involvement 105880~|~1~|~1~|~01/STR~|~Land & Buildings - LBM7 (100% State) - Construction of solid driveway in front of remote garage buildings 124538~|~1~|~1~|~01/S5K~|~Resurfacing STP 5,000 - 49,999 124538~|~1~|~2~|~02/STR~|~Resurfacing rural 124538~|~1~|~3~|~03/NFA~|~Resurfacing Not on Federal Aid System 113266~|~1~|~1~|~01/SAF~|~Traffic signal reconstruction. 104494~|~1~|~1~|~01/NFA~|~TR76 (Krause) 113078~|~1~|~1~|~01/NFP~|~Replace Culvert 115355~|~1~|~2~|~02/IMS~|~For insurance purposes, this plan split pertains ONLY to the previous gouges and scrapes that existed on the beam flange of the HAM-71-0675 bridge prior to this most recent damage. 115355~|~1~|~1~|~01/IMS~|~All work related to the repair of bridge HAM-71-0731 and the most recent damage of the HAM-71-0675. HAM-71-0675 damage that pre-existed the most recent hit is in a separate plan split for insurance purposes. 97344~|~1~|~1~|~01/NFP~|~Added plan split due to funding 93609~|~1~|~1~|~01/SAE~|~100% federal funding for Safe Routes to School improvements. 101937~|~1~|~1~|~01/S<2~|~Plan split for Other Federal Hwy - Minor Aertial 89419~|~1~|~1~|~01/STR~|~FY2013 to FY2015 Loop Detector Maintenance and Electrical Repair contract 111214~|~1~|~1~|~01/NFA~|~Bridge rehab Rehabilitate an existing weathering steel fracture-critical truss on Palmer Road by removing all of th? existing superstrncture, widening the abutments & pier & placing a prestressed reinforced concrete beam deck. The project includes associated roadway approach reconstruction. 102381~|~1~|~1~|~01/NHS~|~SCI 52R WB 19.01-19.07SCI 52F 0.00-1.6780/20 Federal/State 102381~|~1~|~2~|~02/NHS~|~SCI 52R WB 19.07-19.31SCI 52D 0.00-1.46SCI 52F 1.67-2.1780/20 Federal/Local 102381~|~1~|~3~|~03/NHS~|~100% Local for curb ramps and full depth. 112587~|~1~|~1~|~01/IMS~|~basic plan split prior to routes being selected 114370~|~1~|~1~|~01/SAF~|~All the work in this project is in this plan split. 123935~|~1~|~1~|~01/STR~|~Plan split for slide repair work at SLM 2.50 & 2.83 on SR-19 in Sandusky County 123935~|~1~|~2~|~02/S5K~|~Plan split for slide repair work at SLM 4.41, 4.63 & 4.76 on SR-19 in Sandusky County 110131~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 13.31. Rural other federal aid funded 80 federal/20 state. 100674~|~1~|~1~|~01/STR~|~Major rehabilitation of HOL-557 from SR 643 to SR 39, HOL-643 from SR 557 to SR 39 including asphalt overlay and continuous shoulder repairs. 100674~|~1~|~2~|~02/NFA~|~Major rehabilitation of HOL-643 from the Coshocton Co. Line to SR 557 including asphalt overlay, pavement repairs and pavement markings. 110468~|~1~|~1~|~01/SAE~|~At the intersection of Glenway and Bridgetown, convert the northbound left turn movement to protected-only, add backplates to northbound left turn signal head, add overlap phase to southbound and westbound right turn lanes, install high visibility crosswalks and turning vehicles yield to PED signs, remove vegetation to improve sight distance at Walgreens driveway, and check clearance intervals. At the intersection of HAM-27 & Struble, convert all left turn movements to protected-only. 119467~|~1~|~1~|~01/BRF~|~Bridge Rehabilition through CEAO BFP program (100% funded up to CAP). 107129~|~1~|~1~|~01/SAF~|~Improve signage and install centerline rumble strips and HFST along Hamilton Ave. Re-construct right turn lane at Belmont Ave. Reconstruct retaining wall. Reconstruct residential driveways to street openings. 124564~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded work. 86965~|~1~|~1~|~01/BRO~|~8706212 WOO SR281 12.9 Intersect: Rocky Ford Creek 86965~|~1~|~2~|~02/STR~|~3503488 HEN SR281 9.69 Intersect: Ash Run 101966~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 2 lane highways. 98716~|~1~|~1~|~01/BRF~|~Structure replacement RIC-TR 152-0.20 (Orewiler Rd). 119745~|~1~|~1~|~01/NFP~|~Creating plan split for TED involvement 101552~|~1~|~1~|~01/STR~|~Minor Rehab - Rural 101552~|~1~|~2~|~02/S<2~|~Minor Rehab - Urbanized area 117734~|~1~|~1~|~01/IMS~|~Split for interstate bridge work 104781~|~1~|~1~|~01/NFP~|~plan split 104781~|~1~|~2~|~02/BRO~|~Fed Bridge 95642~|~1~|~1~|~01/ENH~|~Construction of pedestrian oasis along Belmont Avenue in Liberty Township, Trumbull County, Ohio. 119108~|~1~|~1~|~01/S>2~|~Resurfacing. 119108~|~1~|~2~|~02/S>2/MACE~|~Resurfacing, urban paving in the city of Macedonia. 119108~|~1~|~3~|~03/S>2/MACE~|~Full and partial depth pavement repairs and drainage upgrades. 117613~|~1~|~1~|~01/BRF~|~Superstructure replace 115706~|~1~|~1~|~01/NFP~|~Loop detector maintenance. 100657~|~1~|~2~|~02/S<2~|~This plan split is for the BEL 40 28.17 location. 100657~|~1~|~1~|~01/NHS~|~This plan split is for the COL 9 13.06. 100657~|~1~|~3~|~03/STR~|~This plan split is for the COL 7 22.25, COL 62 4.86 and the COL 14 16.80 locations. 113986~|~1~|~1~|~01/IMS~|~FRA 270 from 37.00 TO 40.50 113986~|~1~|~2~|~02/IMS~|~Item associated with SFN 2512076 - FRA-16-7.98 - Ramp bridge carrying Broad St WB to 270 SB 115838~|~1~|~1~|~01/MPO~|~Plan split for federally eligible portion of Construction/CE 106992~|~1~|~1~|~01/STR~|~GSMP slide repair. 113251~|~1~|~1~|~01/STR~|~Culvert replacement. 100140~|~1~|~1~|~01/NFP~|~Plan split for all work at 100% state 112975~|~1~|~1~|~01/STR~|~Replace bridge WAR-350-0873 over Todd Fork 96646~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 50 10.68-16.34. Rural other federal aid funded 80 federal/20 state. 91044~|~1~|~1~|~01/MPO~|~Reconstruct left lane 105967~|~1~|~1~|~01/IMS~|~Various culverts under IR70 for repair in Preble County from state line to Preble/Montgomery County line. 113550~|~1~|~1~|~01/IMS~|~Split for bridge painting work 99734~|~1~|~1~|~01/ENH~|~Construct Ped/Bike Trail in Village of Syracuse. 95% Federal and 5% Local funds. 107346~|~1~|~1~|~01/STR~|~Culvert replacement 97594~|~1~|~1~|~01/IMS~|~LUC-475 from SLM 9.63 to SLM 14.55 97594~|~1~|~2~|~02/IMS~|~Secor Rd bridge 97594~|~2~|~3~|~03/IMS~|~Median inlets on I-280 92425~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 86634~|~1~|~1~|~01/NFP~|~District Preservation Program funds SAC 4PS7. No local funds. 97014~|~1~|~1~|~01/NFP~|~Guardrail maintenance project 101240~|~1~|~1~|~01/STR~|~Resurfacing (all STP Rural). 109100~|~1~|~1~|~01/STR~|~All work is in this plan split. The structure meets the state but not the federal definition of a bridge. District Preservation Program funds. 122940~|~1~|~1~|~01/NHS~|~Emergency bridge hit repair on Reed Rd over US 30 117936~|~1~|~1~|~01/NFP~|~Crack sealing. 100430~|~1~|~1~|~01/MPO~|~Mill and fill on Vermilion Rd from Liberty Ave to Brownhelm Station Rd 92607~|~1~|~1~|~01/STR~|~Smooth seal SR 502 SLM 0.00 to 8.81 in Darke County. 95671~|~1~|~1~|~01/MPO~|~Bike Path along Sylvania-Metamora Rd 105442~|~1~|~1~|~01/STR~|~All items of work associated with the rehabilitation of the existing bridge over the Big Darby Creek. Work to include pavement work, guardrail work and other miscellaneous work needed to adjust the profile due to the new bridge deck. 96909~|~1~|~1~|~01/BRF/LOUI~|~Superstructure replacement, repair and/or modification of abutments, and new railing of structure over the Nimishillen Creek, City of Louisville, Stark County, Ohio. 113711~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 85245~|~1~|~2~|~02/S>2~|~Superstructure replacement/widening of MAH-224-13.75 structure over SR-11. 85245~|~1~|~1~|~01/SAF~|~Intersection improvement includes adding lanes, from Fairground to Summit 97579~|~1~|~1~|~01/S<2~|~Pavement planing and resufacing of US 40 within the City of Englewood. 118696~|~1~|~1~|~01/NFA~|~Plan split for bridge rehabilitation work. 124890~|~1~|~2~|~02/SAF~|~Safe Routes to School funded sidewalk work on Foraker St. and Plainfield Drive. 124890~|~1~|~1~|~01/STR~|~All TAP funded sidewalk work along Townline Street. 109331~|~1~|~1~|~01/NHS~|~Rehabilitate existing structure BEL-7-1830 (SFN 0700487) by concrete patching, sealing the joints between precast sections and installing structural liner. 102800~|~1~|~1~|~01/STR~|~Resurfacing various STP Rural routes using asphalt 102800~|~1~|~2~|~02/S<2~|~Resurfacing various STP < 200k routes with asphalt 104693~|~1~|~1~|~01/SAF~|~Pavement and restriping on NHS route in the Village of Bethel. 104693~|~1~|~2~|~02/SAF~|~Sidewalk and crossing on NHS route in the Village of Bethel. 106591~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Licking County Engineer Project to replace bridge Lic-CR2-9.38 (SFN 4534735) 117397~|~1~|~1~|~01/STR~|~Plan split for purchasing of beams 101688~|~1~|~1~|~01/STR~|~Landslide Repair. 92980~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 541-00.00 to 08.89; 2) Cos-SR 541-31.59 to 34.62; 92980~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on 1) Cos-541-3335 and 2) Gue-541-0158 83095~|~1~|~1~|~01/MPO~|~mill and fill 83095~|~2~|~2~|~02/MPO~|~This plan split was added for 100% items (removal of encroachments) 119667~|~1~|~1~|~01/NHS~|~CRA US 0030 11.99 119667~|~1~|~2~|~02/STR~|~Culvert Invert Field Paving- 111097~|~1~|~1~|~01/STR~|~Culvert replacement. 105050~|~1~|~1~|~01/NFP~|~Task Order PID for construction inspection services - 4PF7 (60% Federal) / 4PS7 (40% State). 94515~|~1~|~1~|~01/NFP~|~Road and parking lots in various Toledo Area parks. 106996~|~1~|~1~|~01/STR~|~GSMP mine subsidence pavement repair. 108073~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridge. 117196~|~1~|~1~|~01/CMQ~|~Plan split using MPO CMAQ funds for intersection/signal upgrade work at 2 intersections along Ridge Rd in Wickliffe. 105602~|~1~|~1~|~01/NFA~|~Minor widening and resurfacing on County Route 104913~|~1~|~1~|~01/NFA~|~Southwest Schools school bus replacement project 109861~|~1~|~1~|~01/STR~|~HIG Chip Seal FY25 115174~|~1~|~1~|~01/BRF~|~Bridge replacement 80% Federal (4B87) and 20% Local (LNTP) - Federal could increase to 95% pending CBP credit. 106631~|~1~|~1~|~01/BRF~|~Work to replace a bridge. 80% federal funds from the CEAO budget with a 20% match provided by Putnam County until the cap is reached. Funds needed after the cap is reached will be provided by Putnam County. 113486~|~1~|~1~|~01/NHS~|~All work in this plan split using SAC 4BE7 for emergency replacement of the culvert that was washed out. 113602~|~1~|~1~|~01/S>2~|~Extend LMST east to Eulston and provide a separated sidepath along SR-125 to Ranchvale (Alternatives A4 and A5/A6) 113713~|~1~|~1~|~01/SAF~|~Install a new sidewalk along the west side of Pippin Road between Struble and Stout and improve the crossings at the intersections. 94329~|~1~|~2~|~02/STR~|~From SLM 12.03 to 17.49. 94329~|~1~|~1~|~01/S<2~|~From SLM 10.84 to SLM 12.03 105519~|~1~|~1~|~01/STR~|~Rural portions of DEL-42 (13.27-19.17) 105519~|~1~|~2~|~02/S>2~|~General system within the Columbus urban area (DEL-42-9.69-13.27) 105519~|~1~|~3~|~03/SAF~|~Install center line and edge line rumble stripes 81552~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1805401; CUY-071-1795L 97143~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 513 7.04 (SFN 6104061) and NOB 564 0.26 (SFN 6104142). Not on the federal aid system funded 100% state. 100476~|~1~|~1~|~01/STR~|~Fine Graded Polymer Asphalt resurfacing of CAR-9 105375~|~1~|~2~|~02/STR~|~AC overlay without repairs 105375~|~1~|~1~|~01/NHS~|~Resurfacing 116756~|~1~|~1~|~01/S>2~|~Resurfacing. 116756~|~1~|~2~|~02/STR~|~Resurfacing. 91035~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split using federal MPO STP funds. 108515~|~1~|~1~|~01/NFA~|~Landslide Repair for ODNR 82962~|~1~|~1~|~01/IMS~|~Preventative Maintenance on the Priority System for FY2014 113381~|~1~|~1~|~01/SAF~|~Pavement Marking project on various routes in Gallia County using HSIP funds. Funded 100% Federal. 124425~|~1~|~1~|~01/SAF/LOR~|~Sidewalk 103851~|~1~|~1~|~01/ENH~|~Construction of sidewalks on Fairfield Avenue from approximately Woodland to Bittersweet; and approximately 500' on Metz Road; 95% federal/5% local funding. 95833~|~1~|~1~|~01/IMS~|~Perform abument patching, pier patching, and deck edge repair 95833~|~1~|~2~|~02/STR~|~Perfomr abutment patching, pier patching, backwall patching and deck edge repair on various bridges. 95833~|~1~|~3~|~03/NHS~|~Perfomr abutment patching, pier patching, backwall patching and deck edge repair on various bridges. 95833~|~1~|~4~|~04/S<2~|~Perform abutment patching pier patching and deck edge repair. 95833~|~1~|~5~|~05/S<2~|~Perform abutment patching pier patching an deck edge repair. This bridge is under 20". 107601~|~1~|~1~|~01/STR~|~Plan split for resurfacing on rural sections including WAR-350, CLI-350, and CLI-132 104817~|~1~|~1~|~01/S<2~|~Construction Inspection 104817~|~1~|~3~|~03/S<2~|~Construction Inspection 104817~|~1~|~2~|~02/S<2~|~Construction Inspection 104817~|~1~|~4~|~04/S<2~|~Construction Inspection. 124169~|~1~|~1~|~01/NHS~|~Noisewall installation 110590~|~1~|~1~|~01/BRO~|~All the work to replace the bridge. District federal and state funds. 105429~|~1~|~1~|~01/IMS~|~Plan Split for bridges over I-70 93165~|~1~|~1~|~01/STR~|~General system resurfacing of MRW-95: 0-8.12 and MRW-95D: 0-1.15 98318~|~1~|~1~|~01/STR~|~Culvert Replacement - Emergency Type C 122813~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAC 4CD7). Construction phase cap is $79,689.09 and requires a 20% match (TRC) 108725~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-034 96348~|~1~|~1~|~01/SAE~|~100% federal pariticipation on SRTS eligible work items in South Euclid portion of the project. 96348~|~1~|~2~|~02/SAE~|~100% federal participation on SRTS eligible work items in Lyndhurst portion of the project. 102710~|~1~|~1~|~01/NHS~|~This plan split is for mill and fill on NHS route. 102710~|~1~|~2~|~02/NHS~|~City of Centerville requested the use of radar detection units be installed in lieu of using traffic loops to be 100% city funded at $14,508.10 101046~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 101046~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 10' to 20' span. 101046~|~1~|~1~|~01/IMS~|~Resurfacing. 122205~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-A 95859~|~1~|~1~|~01/NFP~|~Culvert at SLM 7.86 98975~|~1~|~1~|~01/MPO~|~Installing 4,590 ft of sidewalk on the SOUTH side of North River Road from SR 46 west to Howland Multi-Purpose trail. Includes benches, plantings and trees. 87007~|~1~|~1~|~01/S>2/SCE~|~Resurfacing of County Route 66 between Orion Street to Wright Road, in Lake Township, Stark County, Ohio. Guardrail and signing where necessary. 88918~|~1~|~1~|~01/BRO~|~Replace existing twin CMP pipes (COL-164-1561, SFN 1504088) with a four-sided concrete box or line existing pipes with liner. 124646~|~1~|~1~|~01/IMS~|~Resurfacing/rehab. 97310~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation. 116652~|~1~|~1~|~01/NHS~|~Plan Split to program project. Update when scope of work is complete. 98263~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of Lic-SR 37-3..79; BR Eligible for Rehabilitation - Length 120'; SDFO(1); DSR 4; SR 86.8 100874~|~1~|~1~|~01/NHS~|~BRO 32 0.10 culvert liner 103889~|~1~|~1~|~01/NFA~|~The TID will reconstruct 2,693 foot of road along Concorde Drive to a two -lane road with 12 foot lanes and two to three foot shoulders between US40 and the building. 118864~|~1~|~1~|~01/STR~|~plan split 123756~|~1~|~1~|~01/IMS~|~Interstate Plan split 101074~|~1~|~1~|~01/NFP~|~Pavement markings 114903~|~1~|~1~|~01/STR~|~WIL-107 105586~|~1~|~1~|~01/NFA~|~The Village will construct a center turn lane along Main Street (ST RT66) by widening from the south corporate limit to 350' north of Industrial Drive. 109890~|~1~|~1~|~01/NHS~|~SFN 3500241 approach slab. 99935~|~1~|~1~|~01/NFP~|~Tree cutting and pruning contract. 121151~|~1~|~1~|~01/NHS~|~All Work is within this split 100651~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 50 1595 L & R (SFN 0501573 L, 0501603 R) and ATH 50 3491 L & R (SFN 0502073 L, 0502103 R). NHS route funded 80 federal/20 state. 122048~|~1~|~1~|~01/IMS~|~Plan split represents all work related to roadway construction. 122048~|~1~|~3~|~03/IMS~|~This spit is for bridge removal 122048~|~1~|~2~|~02/IMS~|~This Plan split represents bridge replacement work. 122972~|~1~|~1~|~01/SAF~|~Corridor safety improvements 106111~|~1~|~1~|~01/STR~|~DSR BEL-008 116560~|~1~|~1~|~01/IMS~|~Plan Split for bridge work 105141~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' structure. 105141~|~1~|~1~|~01/NHS~|~Resurfacing of ATB-SR 11 from 8.05 to 13.94. 105141~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span. 124117~|~1~|~1~|~01/NHS~|~Pavement Widening 24998~|~1~|~1~|~01/IMS~|~Planing and resurfacing of existing pavement and widening u-turns on Interstate 75 from 0.42 mile North of junction CR 15 (SLM 14.15) to 0.95 mile North of Piqua North Corporation Limit (SLM 18.90). 97705~|~1~|~2~|~02/ENH~|~Install Sidewalk on East side of Prospect Street from Skeels St to Ravenna South Corp Limit. 97705~|~1~|~1~|~01/MPO~|~Resurfacing CR 74 from SR 5/44 to Ravenna South Corp Limit. 109451~|~1~|~1~|~01/CMQ~|~Construct a roundabout at the intersection. 101264~|~1~|~2~|~02/NHS~|~Pavement full and partial depth repairs and curb ramps along SR 18 in the City of Akron. 101264~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing SUM SR 18 from 4.91 to 6.56 and 7.98 to 9.88, urban paving in the City of Akron. 104789~|~1~|~1~|~01/ENH/NEWA~|~"01/ENH/OT/NEWA" - City of Newark project utilizing LCATS funding for construction of multi-use path. 104789~|~2~|~2~|~02/S50/NWRK~|~Replacement of LIC CR 803 1.116 (SFN 4561430) which carries Granville Road over Log Pond Run Diversion Channel. 116678~|~1~|~1~|~01/STR~|~All work is in this plan split. 109591~|~1~|~1~|~01/MPO~|~Construction of a section of the Great Miami River Trail from the City of Monroe Bicentennial Commons Park to the northern corp. limit. 119213~|~1~|~1~|~01/IMS~|~Highway Lighting. 115861~|~1~|~1~|~01/NHS~|~Plan split for all culvert locations. 96072~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " plan Split for construction of a loader/equipment storage building at the proposed Crooksville OP in Perry County 95711~|~1~|~1~|~01/STR~|~Perform a shoulder stabilization and overlay. With the berm stabilization, the pavement width will be widened to 24' and stiriped for 11' lane widths with a 1' pave berm and an 18" aggregate berm. 99744~|~1~|~1~|~01/MPO~|~For work on the sidewalk and multi-use trail. 99744~|~1~|~2~|~02/BRF~|~SFN 2561549, 100% City of Columbus costs 97646~|~1~|~1~|~01/BRF~|~SFN 8631239 99610~|~1~|~1~|~01/S50~|~Replace existing slab bridge BEL 40 2748 (SFN 0701807) with new structure 103416~|~1~|~1~|~01/CMQ/BASH~|~Conventional intersection improvement at Plainfield Road with the EB SR-126 ramps, and conversion of the Plainfield Road intersections with Hunt Road and Peppermill Lane/Reed Hartman Highway to modern roundabouts. 103416~|~1~|~2~|~02/CMQ~|~Conversion of the existing intersection of Hunt Road with Kroger's main driveway to a modern roundabout. Split is not eligible for ODOT safety funds. 115632~|~1~|~1~|~01/SAE/CCEO~|~Replacement of existing guardrail, and installation of new guardrail, on various county roads in Clinton County, OH. 83975~|~1~|~1~|~01/S>2~|~Rehab bridge over South Plum Run (not currently BR eligb-but close)2517078 FRA SR665 12.62 Intersect: Plum Run01/S>2/BR/ 113219~|~1~|~1~|~01/IMS~|~Plan split for reconstruction 103060~|~1~|~1~|~01/NHS~|~Mill and fill of Colonel Glenn from Grange Hall Road to the eastern City of Beavercreek corp. limit including replacement of deteriorated curb, catch basins, and sidewalk. Installation of raised pavement markers, and upgrade of all curb ramps to be ADA compliant. 122828~|~1~|~1~|~01/MPO~|~Union Township EV projects 2026 93391~|~1~|~1~|~01/BRO~|~Plan Split for SFN 6739016 Parkman Road bridge over Eagle Creek 88745~|~1~|~1~|~01/STR~|~Fast dry pavement markers district wide. 118572~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacement on various routes throughout Stark and Summit County. 84627~|~1~|~2~|~02/NHS~|~See linked structures. 84627~|~1~|~3~|~03/S>2~|~Fine graded polymer AC overlay on STA SR 297 from 0.00 to 0.66 and STA SR 627 Ramps C & D. 84627~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay on STA US 30 from 9.61 to 13.03. Sealing of SFN# 7607385, SFN# 7607369 and SFN# 7607393. 97375~|~1~|~1~|~01/NHS~|~This PID is for payment to a developer for the Design- Build- Finance- Operate- Maintain (DBFOM) contract for the Portsmouth Bypass. 97375~|~1~|~3~|~03/STR~|~SCI SR823 6.67-10.22 PortsByPass Brdgs added for $11,002,590.00. This includes the Cattle Crossing structure, Brdg SCI-234-0122, Brdg SCI-823-0837L. Brdg SCI-823-0837R, Brdg SCI-823-0917L, & Brdg SCI-823-0917R. 80/20/split 97375~|~1~|~2~|~02/STR~|~SCI SR823 6.67-10.22 PortsByPass It is proposed to construct a new Bypass beginning @ US52 (SR823 SLM 0.00), north and terminate @ US23 (SR823 SLM 16.78).The project includes 5 new interchanges and several new bridges. Portsmouth Bypass was previously programmed under 3 PID's. Phase 1 was originally PID 19415 & now includes all 3 phases and originally began at SLM 6.81, Shumway Hollow Rd. and terminated at SLM 10.13 Lucasville-Minford Rd. Phase 2 was under 79977 and began at SLM 10.13 Lucasville-Minford Rd. and terminated at US23 SLM 16.78 and Phase 3 was under 77366 beginning at SLM 0.00, US52 and terminating at Shumway Hollow Rd. SLM 6.81. 80/20 split 119298~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing of US 40 105176~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route: CHP SR 235 SLM 9.58 to 11.19. 95765~|~1~|~2~|~02/STR~|~SFNs: 7202946, 7202997, 7203012, 7203055 95765~|~1~|~1~|~01/STR~|~SAN-412 from 4.70 to 8.72 & SAN-590 from 0.00 to 6.55 100487~|~1~|~1~|~01/S<2~|~ROS 159 (0.42-0.97) 100487~|~1~|~2~|~02/NHS~|~ROS 159 (0.97-1.14) 100487~|~1~|~3~|~03/S<2~|~ROS 159 (0.00-0.42) 20% local match. 100487~|~1~|~4~|~04/NHS~|~ROS 159 (1.14-1.22)20% local match 100487~|~1~|~5~|~05/S<2~|~100% local for curb ramps and full depth repair. 100487~|~1~|~6~|~06/S<2~|~ROS 159 0.42 (SFN 7104189)Replace strip seal glands; remove/reapply epoxy paint on sidewalks and parapets; *Replace pressure relief joint with Armorless Preformed Joint Seal (compression seal) after extending rigid approach pavement. 100487~|~1~|~7~|~07/NFA~|~This is to resurface the ODNR Headquarters parking lot in Chillicothe at 345 Allen Avenue. 100487~|~1~|~8~|~08/NHS~|~ROS 35 19.71 (SFN 7102070 & 7102046) 98638~|~1~|~1~|~01/STR~|~SFN 5403286, MER-219-1210 on Schrodor Ditch - replace deficient twin 72" reinforced concrete pipe (RCP) culvert. 118880~|~1~|~1~|~01/S5K~|~Resurfacing US 40 96100~|~1~|~2~|~02/NHS~|~ROS US 35 33.48 96100~|~1~|~1~|~01/MPO~|~Plan split for Bridge approach slab jackingSFN 4404394LAW-7-6.90 95781~|~1~|~1~|~01/S<2/FCEO~|~"O1/S<2/OT/FCEO" - County Engineer?s Association Funding STP 4B77 (80% Federal) / LNTP (20% Local Match) ? CAP = $50,000.00 in Federal Funding requiring local match ? Upgrade of signs along CR 33A from the 08.19 mile marker (southern corp limit of the City of Lancaster) to the 11.13 mile marker, CR 63 (Horns Mill Road). 112019~|~1~|~1~|~01/SAF~|~Improvements to the existing street via roadway, drainage, pedestrian, and bicycle infrastructure additions or alterations. Traffic calming elements are also proposed. 120095~|~1~|~1~|~01/STR~|~added plan split. 113992~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/OT/KCEO" - upgrade of pavement markings along various county routes in Knox County. 120343~|~1~|~1~|~01/NFA~|~NEVI Round 2 77-B 124616~|~1~|~1~|~01/STR~|~Pavement Markings on various Huron County roads 124150~|~1~|~1~|~01/S5K~|~MRG-376-1.05 Emergency Landslide Project 99484~|~1~|~1~|~01/ENH~|~Construct bike/pedestrian trail connecting the Mahoning Valley Trail to Early Hill Park, in the City of Alliance, Stark County, Ohio. 91448~|~1~|~1~|~01/S>2~|~Bexley urban pavingFRA-16: 3.57-4.32 96288~|~1~|~1~|~01/STR~|~Bridge ReplacementSR125 SFN 0103004 SLM 3.03 95216~|~1~|~1~|~01/S<2/ELiv~|~Plan split for mill and fill project in East Liverpool on Park Way, Walnut, 5th and 6th streets using Small Cities/Local funds 80/20. 113823~|~1~|~1~|~01/S>2~|~Split 1 for major rehab work 113823~|~1~|~3~|~03/IMS~|~Split for bridge repairs to the structure over IR-480. 113823~|~1~|~2~|~02/IMS~|~Split for modification to Ramp GE-1A 98617~|~1~|~1~|~01/STR~|~Resurfacing Mahoning Avenue (CR 18) near the turnpike interchange. 112852~|~1~|~1~|~01/S<2~|~UNI-245 (Ramp R) SLM-7.46-7.65 (Sta 3+17.91 - 13+36.43) 112852~|~1~|~2~|~02/NHS~|~UNI-33 SLM 8.72-12.60 112852~|~1~|~3~|~03/NHS~|~UNI-33 1218 L&R Bridge over US36 120389~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 106080~|~1~|~1~|~01/S>2~|~Urban route within the City of Columbus: FRA-23-18.53-20.34 106080~|~1~|~2~|~02/S>2~|~100% Columbus items 104158~|~1~|~1~|~01/NHS~|~Highway Lighting 104158~|~1~|~2~|~02/NHS~|~Lighting in North Ridgeville 93571~|~1~|~2~|~02/NHS~|~SFN 120577 CLASR00004**C 23.350 reface abutments using anodes, dec edge replacement using anodes, patch pier cap right forward Pier 2, encase pier columns to botton of pier caps, rebuild and/or patch wingwalls, seal deck edges, pier caps, reface abutments and wingwalls with epoxy-urethane sealer, remove asphalt wearing surface and replace asphalt wearing surface, waterproof entire deck, saw and seal expansion joints in asphalt pavement. SFN 1200038 & SFN 1200062 CLA-4-6.67 L&R replace the existing retainer clips, modifications to the parapets to accept the new retainer clips and installing a new seal with MOT. 93571~|~1~|~1~|~01/STR~|~(SFN 1201468 CLA 41 0290 - encase piers) (SFN 5501563 MIA 55 1533 - repair anode abutments and encase piers) (SFN 5503876 MIA 201 0853 - repair anode abutments, anode edge, and encase pier) (SFN 5504449 MIA 589 0008 - repair anode abutments, anode edge, and encase pier) (SFN 7503334 SHE 589 0437- repair anode abutments, anode edge, and encase pier) (SFN 7500459 SHE 47 0561 - Encase pier and adode edges) (SFN 5503841 MIA 201 0611 Indian River Rebuild deck edge using anodes, reface abutments using anodes, and encase pier piling) SFN 5503817 MIA 201 0490 Honey Creek reface abutments using anodes, encase pier piling, and reface abutments using anodes) and SFN 5503515, MIA 185 0388. 93571~|~1~|~3~|~03/S>2~|~SFN 1206273 CLA-571-0125 on Honey Creek encase pier piling front and rear. 105835~|~1~|~1~|~01/S>2~|~Culvert rehab on Lg. Urban route. 105835~|~1~|~2~|~02/S>2~|~Culvert rehab on bridge size culverts in large urban route. 105835~|~1~|~3~|~03/STR~|~Culvert repair on bridge size culverts on rural routes. 105835~|~1~|~4~|~04/SAF~|~We will be adding a slotted drain along SWARSR00048**C approx SLM 0.35-0.41. 118234~|~1~|~1~|~01/SAF~|~Plan Split for Safety funding event 118234~|~1~|~2~|~02/NHS~|~Plan Split for Urban Paving 118234~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded scope. 108112~|~1~|~1~|~01/CMQ~|~Construction of Phase 3 of the Oxford Area Trail Network, and paving of the fine graded gravel section of the trail between Bonham Road and SR-73. 108112~|~1~|~2~|~02/ENH~|~Split to cover Part 2 work programmed under PID 109427: construction of a shared use path from Talawanda Middle School to Oxford Community Park. 124102~|~1~|~1~|~01/NFA~|~Created for J&C involvement 98080~|~1~|~1~|~01/STR~|~Microsurface the exisiting roadways on various roadways in D7 for preventative maintenance.CHP SR 235 SLM 0.00 to 6.59CLA SR 235 SLM 8.84 to 11.83MER SR 219 SLM 1.09 to 6.13SHE SR 589 SLM 0.00 to 4.70(OC 000) 115502~|~1~|~2~|~02/BRO~|~Local section - Field pave the invert of the bridge type culvert 115502~|~1~|~1~|~01/BRO~|~State section - Field pave the invert of the bridge type culvert 104933~|~1~|~1~|~01/MPO~|~Streetscape work eligible for federal funding. 104933~|~1~|~2~|~02/NFP~|~Streetscape work not eligible for federal-aid i.e. 100% local pariticipation 94177~|~1~|~1~|~01/NHS~|~Replace existing superstructure on bridge JEF-7-1979 (SFN 4101081) with new steel beam superstructure and composite reinforced concrete deck. Convert abutments to semi-integral and repair substructure as needed. Provide new full width approach slabs. Raise bridge to meet current standards. 82315~|~1~|~1~|~01/NHS~|~Resurfacing - 80/20 - District Allocation/City of Norwalk 82315~|~1~|~3~|~03/NHS~|~District Allocation 82315~|~1~|~2~|~02/S<2~|~100% City of Norwalk 82315~|~1~|~5~|~05/S<2~|~District Allocation 82315~|~1~|~4~|~04/S<2~|~Resurfacing - 80/20 - District Allocation/City of Norwalk 116456~|~1~|~1~|~01/MPO/MASS~|~Resurfacing. 115340~|~1~|~1~|~01/MPO/KENT~|~Resurfacing 115340~|~1~|~2~|~02/S>2/KENT~|~100% city of Kent items, including replacing/relaying decorative brick pavement and sidewalk, replace concrete curbs and reconstruct/adjust catch basins and manholes. 92614~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work in the urban area using federal STP funds. SLM 1.68 to SLM 2.71 92614~|~1~|~2~|~02/STR~|~80/20 fed/state funding split for all work in the rural area using federal STP funds. SLM 2.71 to SLM 5.54 85352~|~1~|~1~|~01/NFP~|~River Trail Phase 4 in the City of Marietta. Rehabilitation of the Harmar Railroad Bridge for shared use path over the Muskingum River. 100% Local. 114458~|~1~|~1~|~01/STR~|~Resurfacing SR 331 122566~|~1~|~1~|~01/S>2~|~ORDC Share 98854~|~1~|~1~|~01/MPO~|~80% federal w/20% local match for eligible pavement repair work. 110434~|~1~|~1~|~01/NFA~|~CEAO Safety (4HB7) 114583~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 218 10.26. Work includes drilled shaft wall. 122326~|~1~|~1~|~01/IMS~|~Plan split for interstate bridge rehabilitation 92423~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds SAC 4PS7. 99879~|~1~|~1~|~01/CMQ~|~Upgrading signals along SR 14, SR 43 and SR 303 at various intersections in the city of Streetsboro. 99879~|~1~|~2~|~02/NHS/STRS~|~100% City of Streetsboro items, including unwarranted signal work. 117353~|~1~|~2~|~02/BRF~|~All other work on the bridge. 100% local funds. 117353~|~1~|~1~|~01/BRF~|~Work including only the superstructure replacement. 97613~|~1~|~2~|~02/NFA~|~Replace MRW TR 189 0.49 (SFN 5930340) over Dry Creek 97613~|~1~|~1~|~01/NFA~|~Replace MRW CR 201 2.04 (SFN 5930391) over tributary of Dry Creek 104015~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. PRE-TR 106-0055 (SFN: 6833136) which carries Guy Murray Road over Whitewater Creek. 103108~|~1~|~1~|~01/SAF~|~Upgrade the traffic signal hardware at the intersection of US 30 & Beaver St., US 30 & Market St., US 30 & Jefferson St., SR 45 & N. Park Ave. and US 30 & SR 154 in the Village of Lisbon. Minor radius improvement at the US 30 & SR 154 intersection. 110093~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 17.60. Funded 100% State ER. 98645~|~1~|~1~|~01/SAF~|~Guardrail. 97634~|~1~|~1~|~01/NFA~|~Replace SFN 7832818 TRU Corinth Court Road (TR-261) Bridge over Sugar Creek and bring up to current design standards. 110072~|~1~|~1~|~01/NFA~|~FAY 753 from 1.09 to 5.24 110072~|~1~|~2~|~02/STR~|~PIC 207 from 0 to 5.01, PIC 207 from 5.01 to 9.57, PIC 361 from 0 to 4.67 101061~|~1~|~1~|~01/STR~|~Chip sealing. 108419~|~1~|~1~|~01/NHS~|~Mill and fill in the City of Huber Heights. MOT SR 202 SLM 4.37 to 5.40 116680~|~1~|~1~|~01/STR~|~On SR 235 in Hancock County from SLM 8.98 to 12.79 122055~|~1~|~1~|~01/ENH~|~Plan Split for Transportation Alternatives Funding 114050~|~1~|~1~|~01/BRF~|~Replacement of Bridge PRE-TR 216-0.65 (SFN: 6841333) 122447~|~1~|~1~|~01/S>2~|~Drainage improvement along SR 750 94464~|~1~|~1~|~01/IMS~|~Erosion repair at SUM-IR271-0.03, in Summit County, Ohio. 117917~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-D 116787~|~1~|~1~|~01/IMS~|~Resurfacing plan split 122444~|~1~|~1~|~01/IMS~|~All items of work associated with the resurfacing of I-71. Also includes work on drainage, guardrail, signing and other miscellaneous items. 99468~|~1~|~1~|~01/STR~|~Geological Site Management 4SF7 (80% Federal) / 4SS7 (20% State) -Drilled Shaft Wall GUE-SR 83-9.33 115747~|~1~|~1~|~01/S>2~|~Plan Split for the 80/20 (ODOT/City) items for the urban paving 115747~|~1~|~2~|~02/S>2/NOR~|~Plan Split for the 100% Safety items and all other non-eligible items from the urban paving program that are considered 100% local costs. 111009~|~1~|~1~|~01/SAF~|~Intersection improvement on ATB SR 45 at Clay St. 111009~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 96615~|~1~|~1~|~01/NFP~|~All work to replace two bridges. None of the bridges have a sufficiency rating or deck summary rating low enough to be eligible for federal funds for a bridge replacement. Funding is 100% state funds from the District Preservation Program SAC 4PS7. 96615~|~1~|~2~|~02/STR~|~Safety funded work along SR 115 at SLM 8.26 and 8.50 to make shoulder and guardrail improvements. 107917~|~1~|~1~|~01/S<2~|~FAY-22IC, 62IC and 753 and associated bridges 107917~|~1~|~2~|~02/STR~|~FAY 435 and associated bridges 116959~|~1~|~1~|~01/S>2~|~Resurfacing 122302~|~1~|~1~|~01/STR~|~Landslide repair. 98657~|~1~|~2~|~02/IMS~|~Split for ding-and-dent work, 100% state 98657~|~1~|~1~|~01/IMS~|~Plan split for fed/state split for guardrail upgrading 98657~|~1~|~3~|~03/IMS~|~Plan split for misc. non-guardrail work. 98657~|~1~|~4~|~04/NHS~|~Split for guardrail upgrading on US-422 85209~|~1~|~1~|~01/ERD~|~"01/ERD/OT" - Location unknown; reconstruct the Tuscarawas County Tourist Information Center, (which was located in the IR 77 rest areas that were demolished). 119353~|~1~|~1~|~01/S>2~|~Resurfacing 114173~|~1~|~1~|~01/STR~|~added split. 87144~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 690 1.60-5.00. 100% State. 87144~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 690 0.00-1.60. Rural other federal aid funded 80% Federal and 20% State. 98844~|~1~|~1~|~01/MPO~|~Mill and fill Elyria Avenue from Lorain SCL to SR 611, including curb replacement. 107771~|~1~|~1~|~01/IMS~|~Covers all work to rehab bridge. 99013~|~1~|~1~|~01/SAF~|~District wide fast dry pavement marking 93467~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split using federal aid NH funding for the bridge replacement work. 121191~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway lighting on the state maintained highway system throughout District 11. 99469~|~1~|~1~|~01/STR~|~Geological Site Management 4SF7 (80% Federal) / 4SS7 (20% State) -Drilled Shaft Wall GUE-SR 265-12.80 83451~|~1~|~1~|~01/NHS~|~District AllocationPreventive Maintenance: Spot painting structural steel (021) 102690~|~1~|~1~|~01/SAF~|~paving, signage and signal upgrade. 100739~|~1~|~1~|~01/NFP~|~RPM's on various routes 122117~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items 98642~|~1~|~1~|~01/STR~|~SFN 5400333, MER-29-0780 on Big Beaver Creek - remove and replace entire bridge structure with new bridge (substructure and superstructure). 107904~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - On portions of Kno-SR 3-17.82 to 34.71; Lic-SR079-17.00 to 33.10; Lic-SR 586-01.00 to 09.00 Per-SR 37-00.00 to 08.59; Per-SR 37-15.02 to 20.69; 106350~|~1~|~2~|~02/NFP~|~Part 2 of the contract 106350~|~1~|~1~|~01/NFP~|~Part 1 of the project 114556~|~1~|~1~|~01/STR~|~AC Overlay with repairs. 99864~|~1~|~3~|~03/STR~|~Paint existing steel superstructure and seal necessary concrete surfaces. 99864~|~1~|~1~|~01/NHS~|~Paint existing steel superstructure and seal necessary concrete surfaces. 99864~|~1~|~4~|~04/IMS~|~Paint existing steel superstructure and seal necessary concrete surfaces 99864~|~1~|~2~|~02/NFA~|~Paint existing steel superstructure and seal necessary concrete surfaces. 115219~|~1~|~1~|~01/SAF~|~Sidewalk & Ped Facilities. 113085~|~1~|~1~|~01/STR~|~Added Bridge plan split 92653~|~1~|~1~|~01/S>2~|~Replacement of SFN 7700849 over Yellow Creek 100325~|~1~|~1~|~01/NFP~|~This is the district's annual auxiliary pavement marking project. 114933~|~1~|~1~|~01/S5K/CONN~|~Resurfacing, urban paving in the city of Conneaut. 114933~|~1~|~3~|~03/S5K~|~Bridge preventative maintenance work. 114933~|~1~|~2~|~02/S5K/CONN~|~Full and partial depth repairs and ADA curb ramps. 95757~|~1~|~1~|~01/STR~|~OTT-SR163 from SLM 9.98 to 13.80 OTT-SR163 from SLM 14.25 to 15.27 95757~|~1~|~2~|~02/STR~|~Bridge split 102698~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a CPR treatment. ATH 33 16.48-25.36, MEG 33 0.00-3.09, 14.15-29.10. NHS route funded 80 federal/20 state. 116856~|~1~|~1~|~01/S>2~|~Resurfacing 116856~|~1~|~2~|~02/S>2~|~Curbs at 100% local 116856~|~1~|~3~|~03/NFP~|~Retroactive fuel price adjustment 83861~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - District Preservation - 4CP7 (100% State) - Two year contract for Guardrail repairs; upgrades; and replacement within District 5 on IR; US; and SR 89718~|~1~|~1~|~01/ENH~|~Plan split for all work eligible for enhancement funding 89718~|~1~|~2~|~02/ENH~|~100% local funding split 107380~|~1~|~1~|~01/STR~|~2 Culvert replacements 121194~|~1~|~1~|~01/NFP~|~District wide systematic RPM replacement project 118674~|~1~|~1~|~01/S5K~|~Install pavement markers on various county roads 98377~|~1~|~2~|~02/NHS~|~Minor Bridge work to SFN 6701132 POR 43 11.52 over Cuyahoga River and CSX Railroad 98377~|~1~|~1~|~01/NHS/KENT~|~Resurfacing POR SR 43 from 11.78 to 12.19 and 12.28 to 13.21 and POR SR 43D from 0.00 to 0.35.5 in the City of Kent. 101138~|~1~|~1~|~01/STR~|~DSR# BEL-015 110377~|~1~|~1~|~01/SAF~|~Add turn lanes at the intersection E Broad St and Reynoldsburg New Albany Rd 106779~|~1~|~1~|~01/MPO~|~MPO funded 80/20 split 106779~|~1~|~2~|~02/BRF~|~100% LPA on 2nd St bridge 100979~|~1~|~1~|~01/NHS~|~DSR# HAS-002 107816~|~1~|~1~|~01/S<2/Bprt~|~Emergency landslide repair. 112369~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in HOC Co. Funded 100% Federal. 101897~|~1~|~1~|~01/MPO~|~Mahoning County Engineer. 91966~|~1~|~1~|~01/S<2/COSH~|~"01/S2~|~Dryden Road rehab in the City of Moraine. 105854~|~1~|~2~|~02/SAF~|~Signal work. 111424~|~1~|~1~|~01/SAE~|~Split for safety upgrading of intersection. 116648~|~1~|~1~|~01/MPO~|~Purchase of bike share equipment for expansion of the system in the Cincinnati area. 119992~|~1~|~1~|~01/NHS~|~Smoothseal WAY-30-0.00 to 9.18 93320~|~1~|~1~|~01/S>2~|~Remove asphalt wearing surface and replace with microsilica modified concrete overlay with minimal approach work on SFN 5712084 MOT 835 0257 over Little Beaver Creek. 88856~|~1~|~1~|~01/STR~|~Bridge Superstructure Rehab HUR-99-5.82 - Part 1 88856~|~1~|~2~|~02/STR~|~Culvert Replacement HUR-99-10.46 - Part 2 Task Order. 121676~|~1~|~1~|~01/IMS~|~Reactive Maintenance LOR-90-10.76 to 18.60 115179~|~1~|~1~|~01/S>2~|~Franklin County. SR 161 (from Answorth Dr to Strathaven Dr) and Linworth Road 115179~|~2~|~2~|~02/SAE~|~Safety Improvements at SR 161/Bellbrook Place intersection including sidewalks, crosswalks, RRFB. 114713~|~1~|~1~|~01/NHS~|~Noise wall construction. 105627~|~1~|~1~|~01/STR~|~Rural plan split 105627~|~1~|~2~|~02/S>2~|~Urbanized Area Plan Split 106441~|~1~|~1~|~01/SAF~|~Widen SR31 from 4 to 5 lanes, new WB slip ramp and signal installation. 106441~|~1~|~2~|~02/NFA~|~Extension of Northwoods Drive including lighting, waterline, sanitary and roundabout at Mill Rd intersection 83816~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 329 0.00-12.19, 13.66-14.60. 80/20% Federal/State. 83816~|~1~|~2~|~02/SAF~|~Curve widening with minor realignment on HOC SR 93 2.04-2.34. Federal Safety 90%/State Safety 10%. 124417~|~1~|~1~|~01/NFP~|~Created for J&C TID Involvement 116385~|~1~|~1~|~01/NHS~|~COL-11 122509~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes 124122~|~1~|~1~|~01/NFP~|~Plan split for bridge operations 110128~|~1~|~1~|~01/STR~|~Rural Plan Split 108131~|~1~|~1~|~01/CMQ~|~Intersection improvement at Cleveland-Massillon Rd and Ridgewood Rd. 83057~|~1~|~2~|~02/NFA~|~Resurface SR286 0.00 to 1.36Brdg is a pave thru.3603709 HIG SR286 0.36 Intersect: Indian Run100% state 02/NFA/PV/State 83057~|~1~|~1~|~01/STR~|~Resurface HIG SR136 0.00 to 7.21 All brdgs are pave thru. 3602818 HIG SR136 0.05 Intersect: Branch Of Ohio Brush Crk3602826 HIG SR136 0.09 Intersect: Stream3602834 HIG SR136 1.64 Intersect: Oak Run3602850 HIG SR136 2.8 Intersect: Br Of Ohio Brush Creek3602885 HIG SR136 4.92 Intersect: Br East Fk White Oak Crk3602915 HIG SR136 6.36 Intersect: Sugar Run80/20 split01/STR/PV/State 107246~|~1~|~3~|~03/NHS~|~Minor bridge rehab. 107246~|~1~|~2~|~02/IMS~|~Minor bridge rehab. 107246~|~1~|~4~|~04/S>2~|~Minor bridge rehab. 107246~|~1~|~6~|~06/STR~|~Minor bridge rehab. 107246~|~1~|~7~|~07/IMS~|~Bridge hit repairs including heat straightening or remove and replace portion of beam. 107246~|~1~|~5~|~05/S5K~|~Minor bridge work. 107246~|~1~|~1~|~01/IMS~|~Removal of an abandoned railroad bridge. 24130~|~1~|~2~|~02/S<2~|~100% City of Medina items - Traffic Signal & Pavement Fabric 24130~|~1~|~1~|~01/S<2~|~Intersection improvement 102525~|~1~|~1~|~01/STR~|~District Preservation Bridge Funds - 4PF7 (80%) / 4PS7 (20%) - No CAP - Replacement of structure at MUS-22-18.82 (SFN 6000630). BR Eligible for Replacement: Length = 50; SDFO (1); DSR = 5; SR = 49.1; 111556~|~1~|~1~|~01/MPO~|~Federally eligible work. 121342~|~1~|~1~|~01/NHS~|~NHS plan split. 109307~|~1~|~1~|~01/NFP~|~Culvert invert paving 98056~|~1~|~1~|~01/NFP~|~Constructing road improvements to National Road Corridor 98056~|~1~|~2~|~02/NFA~|~Construction road improvements in the National Road Corridor 76794~|~1~|~1~|~01/IMS~|~100% UNFU plan split 90699~|~1~|~1~|~01/S<2~|~Stone box culvert replacement 101945~|~1~|~1~|~01/S<2~|~01/S<2/PV/ELIV - For Small City funded work at 95% Federal (80% 4B97 and 15% Toll Revenue Credit) matched with 5% Local (LNTP) 96009~|~1~|~1~|~01/BRO~|~SFNs: 3502287, 3502317, 3502341. 112721~|~1~|~1~|~01/NHS~|~bridge replacement Harrison over I70-9.75 101044~|~1~|~2~|~02/S<2~|~Chip seal various routes in Champaign & Clark Counties: CHP SR 55 SLM 15.02 to 15.05 == CHP SR 296 SLM 2.33 to 2.84 101044~|~1~|~1~|~01/STR~|~Chip seal various routes in Champaign & Clark County: CHP SR 54 SLM 0.00 to 1.70 == CHP SR 55 SLM 0.70 to 15.02 == CHP SR 56 SLM 0.00 to 5.32 == CHP US 36 SLM 22.33 to 29.05 == CHP SR 296 SLM 0.00 to 2.33 and 2.84 to 5.98 == CLA SR 56 SLM 0.00 to 4.13 116726~|~1~|~1~|~01/NHS~|~Resurfacing. 106417~|~1~|~1~|~01/STR~|~Left turn lane addition on WAS 821 2.30. Rural other federal aid funded 100% local (private). 114494~|~1~|~1~|~01/NHS~|~FY26 Smoothseal project 116279~|~1~|~1~|~01/S50~|~Smoothseal 110708~|~1~|~1~|~01/NFP~|~To construct/replace sidewalks along the west side of Bodmer Avenue in the Village of Strasburg. 113231~|~1~|~1~|~01/NHS~|~This plan split is for the installation of the recessed wet reflective pavement marking for those roadways on the NHS system. 113231~|~1~|~2~|~02/S<2~|~This plan split is for the recessed wet reflective pavement marking for those roadways not on the NHS system. 123523~|~1~|~1~|~01/NFA~|~Slide repair. 113133~|~1~|~1~|~01/IMS~|~Split for interstate PPM work 113133~|~1~|~2~|~02/NHS~|~Split for resurfacing on NHS functional classification 113133~|~1~|~3~|~03/S>2~|~Split for resurfacing on STP > 200,000 functional classification 113133~|~1~|~4~|~04/IMS~|~Plan split for the removal of wrong way speed bumps using SPR Research funds. 83933~|~1~|~1~|~01/NFA~|~3631427 HIG CR11 16.78 Intersect: Hardins Creek CEAO Project 80 Fed/20 Local Match Highland County 3630773 HIG CR11 17.43 Intersect: Bull Creek CEAO 80 Fed/20 Local Match Highland County 01/NFA/BR/High 108879~|~1~|~1~|~01/S<2/MUSK~|~TID will construct improvements to E. Pike Road to gain access to the new Johnston Site Business Park in support of Project Johnston Site. 106448~|~1~|~1~|~01/NFA~|~The County will re-construct and widen approximately 5250 feet of Traxler Drive starting at US Route 20A and moving eats to CR15. 104990~|~1~|~2~|~02/NFA~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Plan Split for Guardrail upgrade on NOFAS-Rural routes 104990~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Plan Split for Guardrail upgrade on OFAH-Rural routes 104990~|~1~|~3~|~03/S5K~|~Guardrail upgrade on OFAH-Rural 5-50K 109244~|~1~|~1~|~01/NFP~|~2020 Operations Chip 110318~|~1~|~1~|~01/NHS~|~Culvert liner project. ATH 7 0.067, CFN 1880505. 93150~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6400485 PER SR13 19.02 Intersect: Little Rush Creek; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=50.3 DSR=4 93150~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: Per-SR 13-17.49 to 19.83; 92752~|~1~|~1~|~01/STR~|~8707146 WOO SR582 12.41 Intersect: Toussaint Creek 93336~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - Safety Funded 4HJ7 (90% Federal) / 4BC7 (10% State) - Superstreet construction from Allen Road to the Lancaster By-Pass 87628~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1808850, 1808869, 1808885 87628~|~1~|~2~|~02/NFP~|~Split for non-federal guardrail work. 92127~|~1~|~1~|~01/NHS~|~resurface LUC US 20 LUC US20 0-7.98; Lucas county line to about King Road 92127~|~1~|~3~|~03/SAF~|~Turn lanes @ Crissey & Herr Rds 92127~|~1~|~2~|~02/NHS~|~@SLM 6.00 111378~|~1~|~1~|~01/NFP~|~The Summit TID will extend Fairlawn Corporate Parkway approximately 575 linear feet in the city of Fairlawn. 121407~|~1~|~1~|~01/NHS~|~Plan Split for guardrail improvements along NHS routes. 101525~|~1~|~1~|~01/STR~|~DSR# COL-005 106563~|~1~|~1~|~01/NFA~|~The Port will construct a new 1200 street (Ragan Drive) Starting at Woodbridge Blvd and moving east in the city of Bowling Greens Woodbridge Business Park. 98361~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement project for FY2021. ATH 13 12.91-15.93, MEG 248 0.00-9.15 and MEG 681 9.00-28.94. Rural other federal aid funded 80 Federal/20 State. 98361~|~1~|~2~|~02/NHS~|~Guardrail upgrade/replacement project for FY2021. ATH 33 15.89-15.99, MEG 33 4.26-13.32, MEG 7 11.00-23.77 and WAS 7 14.05-17.61, 24.42-24.57 . NHS route funded 80 Federal/20 State. 109605~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 15.35. Funded 100% state ER funds. 122515~|~1~|~1~|~01/NFP~|~ODNR funded. 121080~|~1~|~1~|~01/STR~|~STP Rural Plan Split 122033~|~1~|~1~|~01/STR~|~Landslide repair 123910~|~1~|~1~|~01/MPO~|~Construction of a sidewalk on the south side of Lantz Road from Shoreham Drive to Virgallito Park. 122002~|~1~|~1~|~01/NHS~|~Intersection improvement 118941~|~1~|~1~|~01/STR~|~MOE 78-6.79 Culvert Replacement. CFN: 1872678. Funded 100% State. 97199~|~1~|~1~|~01/SAF~|~Highway Lighting Maintenance 113604~|~1~|~2~|~02/NHS~|~Repair of bridge size corrugated metal pipe at GRE-35-0294 only. 113604~|~1~|~1~|~01/STR~|~Repair of larger bridge size corrugated metal pipes on Rural Routes: CLI-350-2.59 and CLI-729-0.28 113604~|~1~|~3~|~03/STR~|~Bridge work on the 3 Rural bridges that are under 20' length. These are: CLI-729-6.15, GRE-380-2.86 and GRE-380-4.71 102592~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 775 0.00-4.74. Funded 100% State. 102592~|~1~|~3~|~03/NFP~|~ODNR project to resurface the parking lot and camper pads at the Tycoon Lake Wildlife Area (Branch ID: 5, 8, 11-23). Funded 100% State. 102592~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 7.70-16.05 and GAL 775 4.74-11.35. Rural other federal aid funded 80 federal/20 state. 116074~|~1~|~1~|~01/STR~|~Bridge Replacement 83849~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation funding to resurface a portion of US 62 in Licking County from the 00.00 to the 10.51 mile marker which is rated as "OFAH-Rural". There are no funding CAPS on this project. ADA ramps within the Village are the District's responsibility to fund. 83849~|~1~|~2~|~02/STR/JOHN~|~"02/STR/OT/JOHN" - Local Funding to replace curb and gutter on a portion of US 62 in Village of Johnstown from the 04.57 to the 04.64 and form the 04.76 to the 04.91 mile markers which are rated as "OFAH-Rural". There is a funding CAPS of $40,000.00. 108352~|~1~|~1~|~01/MPO~|~Bike lanes in the City of Dayton. 102613~|~1~|~1~|~01/IMS~|~Demolish parcels 14, 334 and 345 of the TTV Phase 1 Project, HAM-75-12.60 (PID 82288). 87061~|~1~|~3~|~03/STR~|~Rehabilitate bridge CLI-380-0399 (SFN 1403397)over I-71 by replacing the deck. Work will include raising to 16.5 feet, painting and other associated rehabilitation work items. 87061~|~1~|~2~|~02/IMS~|~Rehabilitate overhead bridges CLI-71-0495 (SFN 1401564) and CLI-71-0567 (SFN 1401629) by replacing the wearing surface. Work on all bridges will include raising to 16.5 feet, painting and other associated rehabilitation work items. 87061~|~1~|~1~|~01/IMS~|~Rehabilitate the concrete portion of IR 71 in Clinton County by adding 4.25" of asphalt between SLM 4.26 to 7.26. 110335~|~1~|~1~|~01/SAE~|~100% CEAO safety funded PM 93796~|~1~|~1~|~01/NHS~|~Replace Brdg structure 0802220Project Termini: Located 0.59 mile west of Georgetown on SR125. Project Description: It is proposed to replace the dificient structure. 80/20 split01/NHS/BR/State 93796~|~1~|~2~|~02/NHS~|~BRO 125 7.11-8.59 112564~|~1~|~1~|~01/MPO~|~Rehabilitation of Elyria Ave 99723~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.75M. 110431~|~1~|~1~|~01/S<2~|~Bridge replacement project. NOB 78 8.20, SFN 6101208. Urban other federal aid funded 80 federal/20 state. 124749~|~1~|~1~|~01/SAF~|~All work included in this plan split. 96799~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 88986~|~1~|~2~|~02/STR~|~US50 SFN 3600998 28.46 Brdg Rehab 88986~|~1~|~1~|~01/STR~|~HIG US50 18.27 - 28.59 Resurfacing ProjectOn US50, begin project 3.41 miles from Hillsboro corp limit and terminate at the Ross County line (SLM 18.27 - 28.59), it is proposed to resurface the highway.Pave Thru Brdgs:3600874 HIG US50 21.55 Intersect: Blinco Creek3600904 HIG US50 22.32 Intersect: Fork Of Blinco Creek3600947 HIG US50 23.78 Intersect: Puncheon Run3600963 HIG US50 25.55 Intersect: Cedar Run80/20 split 102277~|~1~|~1~|~01/STR~|~Spot paving various routes District 11. 119069~|~1~|~1~|~01/MPO~|~Reconstruction of Blue Ash Road including sidewalk replacement, stormwater improvements, new signal, crossings and EV charging stations 119069~|~1~|~2~|~02/MPO~|~Reconstruction of Blue Ash Road including sidewalk replacement, stormwater improvement, new signal, crossings and EV charging station. 83450~|~1~|~1~|~01/STR~|~Enhancement to fix and install sidewalks, decorative lighting and trash recepticles. 123950~|~1~|~1~|~01/NHS~|~geotech plan split. 118637~|~1~|~1~|~01/STR~|~ATH SR 13 13.71 270 Feet Rockfall Hazard Remediation 118843~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 96374~|~1~|~1~|~01/S<2/STRA~|~Upgrade of access to Strasburg Ind Park; Federal aid routes 12th St. and Zeltman Ave. 88792~|~1~|~1~|~01/S>2~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the Dayton Urbanized area on US 42 between SLM 8.76-11.23. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. 88792~|~1~|~4~|~04/NHS~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the NHS portion on US 68 between SLM 8.95-9.43. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 88792~|~1~|~3~|~03/NHS~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the NHS portion on US 68 between SLM 8.95-9.43. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. 88792~|~1~|~2~|~02/S>2~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the Dayton Urbanized area on US 42 between SLM 8.76-11.23. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 101601~|~1~|~1~|~01/STR~|~DSR# JEF-013 102253~|~1~|~1~|~01/S<2~|~Industrial Dr. 107770~|~1~|~1~|~01/NFP~|~All work in this plan split. Uses 100% state funds from the district preservation budget (SAC 4PS7). 88934~|~1~|~1~|~01/IMS~|~Plan Split for MAH IR 80 3.92 to 5.75 and TRU IR 80 0.00 to 4.61. 93565~|~1~|~2~|~02/S>2~|~This split is for the added culvert on US-20A @ 5.87 93565~|~1~|~3~|~03/NFP~|~This is for the water line. 93565~|~1~|~1~|~01/SAE~|~Build a roundabout at the intersection of US-20A and Eber in Monclova Twp. This 100% local funding is to be used first. 83263~|~1~|~1~|~01/S<2~|~Bridge replacement project. HOC 664 16.18 and 16.31. SFN's 3704688 and 3704718 respectively. Urban other federal aid funded 80 federal/20 state. 120702~|~1~|~1~|~01/MPO~|~Resurfacing work on S. Waterloo 120702~|~1~|~2~|~02/NFA~|~Plan split for work on Darwin and Thames Ave which are not on the federal aid system 110615~|~1~|~6~|~06/NHS~|~Minor bridge rehabilitation > 20' span. 110615~|~1~|~1~|~01/NHS~|~Resurfacing. 110615~|~1~|~4~|~04/S>2/CANT~|~Resurfacing, urban paving in the City of Canton. 110615~|~1~|~2~|~02/NHS/CANT~|~Resurfacing, urban paving in the City of Canton. 110615~|~1~|~5~|~05/S>2/CANT~|~100% Canton items, includes full and partial depth repairs. 110615~|~1~|~3~|~03/NHS/CANT~|~100% Canton items, includes full and partial depth repairs. 110615~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment 106158~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 13.10. DSR MRG-005. Rural other federal aid funded 80 federal/20 state. ER funds. 106158~|~2~|~2~|~02/STR~|~Landslide repair. MRG 78 16.62. DSR MRG-006. Rural other federal aid funded 80 federal/20 state. ER funds. 106158~|~2~|~3~|~03/STR~|~Culvert replacement. MRG 78 16.63, CFN 1822163. Funded 80 federal/20 state. 106158~|~1~|~4~|~04/STR~|~Added site MRG SR 78 13.00-13.02 from OH2019-01 event on DSR MRG-002. Added by Change Order for repair under already let contract 19-7026, 100% Federal ER funding. 106158~|~1~|~5~|~05/STR~|~Landslide repair site at MRG 78 16.55-16.58. District preservation funds, 80% Federal/20% State. Added by change order. 100809~|~1~|~1~|~01/S>2~|~Replace the superstructureBlack fencing and lettering to be paid by the local. 117920~|~1~|~1~|~01/NFA~|~I-75-G 157-181 107463~|~1~|~1~|~01/S<2~|~Resurfacing US 40 from St. Clairsville to SLM 23.58 (Blaine) 101305~|~1~|~1~|~01/STR~|~Covers resurfcacing on Rural STP state routes, including 61, 745, 31 and 19. 93172~|~1~|~1~|~01/NHS/STID~|~Widening from two lanes to 4/5 lanes between Kaufman Avenue to Milan Street, Lake Township, Stark County, Ohio. Includes turn lanes, possible roundabouts, signal and sign upgrades, drainage improvements. 93172~|~1~|~2~|~02/NHS~|~Minor bridge work to one structure. 93172~|~1~|~3~|~03/NHS/HART~|~Sidewalks and curb ramps in the Village of Hartville, Stark County, Ohio. 123619~|~1~|~1~|~01/NFA~|~Plan Split - Not on Federal Aid System 87706~|~1~|~1~|~01/IMS~|~Reactive Maintenance - 90/10 District Allocation 124433~|~1~|~1~|~01/STR~|~Construct a roundabout at the intersection of MAR SR 203 and MAR SR 739 105067~|~1~|~1~|~01/BRF~|~See linked structure. 109687~|~1~|~1~|~01/STR~|~Resurfacing SR 212 102279~|~1~|~1~|~01/SAF~|~Programmed intersection lighting 116525~|~1~|~1~|~01/NHS~|~Resurfacing. 120924~|~1~|~1~|~01/S>2~|~Stream and conduit repairs due to erosion. 102093~|~1~|~1~|~01/NFA~|~The City is constructing road improvements, reconstructing and widening Columbia road to two lanes with one center turn lane fromt he intersection at Kingsview Drive north to the municipal limit and adjusting the vertical profile. 123787~|~1~|~1~|~01/CMQ~|~Traffic signal upgrade, including pedestrian crosswalks, and sidewalks, utilizing 100% BHJ 4TB7 funding. 123787~|~1~|~2~|~02/ENH~|~Traffic signal upgrade, including pedestrian crosswalks, and sidewalks, utilizing 100% BHJ 4TB7 funding. 114539~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ eligible work for multi-purpose trail. 102319~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads in Logan County. 114473~|~1~|~1~|~01/NFA~|~Resurfacing JEF-646 from SR 152 to SLM 7.36 114473~|~1~|~2~|~02/S<2~|~Resurfacing JEF-646 from SLM 7.36 to SR 43 105254~|~1~|~1~|~01/NHS~|~Resurfacing SR 11 from SLM 22.70 to the MAH Co. Line 105254~|~1~|~2~|~02/NHS~|~Bridge deck sealing 99504~|~1~|~1~|~01/SAF/LCEO~|~County Engineer's Association Highway Safety Improvement Program (HSIP) Funding - 4HB7 (100% Federal) - See CAP Comment - Licking County Wide Pavement Marking of various County Roads. 122847~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing. 95726~|~1~|~1~|~01/STR~|~Pavement 95726~|~1~|~2~|~02/STR~|~Culvert on SR-109 @ slm 5.26 117491~|~1~|~1~|~01/NFA/POCE~|~Bridge replacement. 95717~|~1~|~1~|~01/NHS~|~LUC-2 from SLM 9.14 to 10.17 95717~|~1~|~2~|~02/NHS~|~Bridges 95717~|~1~|~3~|~03/IMS~|~Bridges 95717~|~2~|~4~|~04/NHS~|~Part 2 - Paving within the Village of Ottawa Hills 95717~|~2~|~6~|~06/NHS~|~Part 2 - 100% City items 95717~|~2~|~5~|~05/NHS~|~Part 2 split for Urban Paving within Toledo 116895~|~1~|~1~|~01/MPO/ALLI~|~Resurfacing of Mahoning Ave in the City of Alliance. 116895~|~1~|~2~|~02/MPO/ALLI~|~Resurfacing of Glamorgan St in the city of Alliance. 100496~|~1~|~2~|~02/NHS~|~SCI 52 31.85 7301952SCI 52 31.86 7301928 100496~|~1~|~1~|~01/NHS~|~SCI 52 31.24-33.82 100496~|~1~|~3~|~03/NHS~|~Line CulvertSCI 52 33.11 (CFN 1885394) 105933~|~1~|~1~|~01/MPO~|~Resurfacing work eligible for federal-aid 105933~|~1~|~2~|~02/NFP~|~100% City funded work items 91804~|~1~|~1~|~01/NFP~|~Sanitary/waterline work at IR-80 rest area. 106367~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridge. 123990~|~1~|~1~|~01/S5K~|~Resurfacing project on HOC CR 14 0.00-0.814, HOC CR 17 0.00-1.105. 123990~|~1~|~2~|~02/STR~|~Resurfacing project on HOC CR 14 0.814-1.76, HOC CR 17 1.105-4.888, HOC CR 25 2.308-3.87, and HOC CR 33A 0.00-1.85. 93740~|~1~|~1~|~01/SAF~|~Upgrade traffic signal at Valley and Harshman. Build campus pathway with lighting from Rohrer Blvd. to Mad River Middle School. Install sidewalk along Enright Street. Build campus pathway for Beverly Gardens Elementary. 114199~|~1~|~1~|~01/IMS~|~FY 2027 Drainage. 116100~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM Counties. 108239~|~1~|~2~|~02/NFP~|~Local funded roadway section of project - Miller St to W. State St. 108239~|~1~|~1~|~01/S<2~|~Rawson Ave - Small City Funds Plan Split - North to Miller St. 108239~|~1~|~3~|~03/SAF~|~Plan split for safety funds to be applied to the signals. 123009~|~1~|~1~|~01/NHS~|~Districtwide signal installation and repairs. 123009~|~1~|~2~|~02/S>2~|~Signal Work. 112930~|~1~|~1~|~01/STR~|~MRW-61-14.13 to 14.83 122277~|~1~|~1~|~01/STR~|~Replace UNI-37-12.24 structure over Bokes Creek 103988~|~1~|~1~|~01/NFA~|~Construction inspection for soil and compaction testing services. 97552~|~1~|~2~|~02/BRF/RIC~|~SFN7032048, Ohio Bridge Partnership Program, RIC - TR 0037 - 00.19 97552~|~1~|~1~|~01/BRF~|~SFN 7033559,Ohio Bridge Partnership Program, RIC - CR 0371 - 02.86 97552~|~1~|~3~|~03/BRF/RIC~|~SFN 7032471, Ohio Bridge Partnership Program, RIC - CR 0048 - 01.61 104920~|~1~|~1~|~01/NFA~|~Belaire Harbor tug boat engine replacement project 115234~|~1~|~1~|~01/SAF~|~Sidewalks in West Union 104991~|~1~|~1~|~01/NFP~|~District Preservation Other Funding - 4PS7 (100% State) - No CAP - District wide Crack Sealing Project 120320~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 212 over Atwood Spillway. 94535~|~1~|~1~|~01/S>2~|~80% Federal / 20% State funding participation using Geologic Site Management funding. 110690~|~1~|~2~|~02/NFA~|~Pavement repairs on Township Rd 110690~|~1~|~1~|~01/STR~|~Pavement Repairs on SR 739. 115686~|~1~|~1~|~01/IMS~|~Split for resurfacing work 119362~|~1~|~1~|~01/S>2~|~Resurfacing 94111~|~1~|~1~|~01/S>2~|~Resurfacing of SR 45 from SLM 7.32 to 7.91 in the City of Warren. 90453~|~4~|~3~|~03/MPO~|~100% Local Items 90453~|~1~|~1~|~01/MPO~|~ERPC - STP Funds for 4R Maintenance - Restoration & Rehabilitation for Minor rehabilitation 90453~|~2~|~2~|~02/MPO~|~TE/TA Funds 99548~|~1~|~1~|~01/STR~|~Culvert Replacement: CRA-103-16.89 96525~|~1~|~1~|~01/MPO~|~Rehabilitation of 4.25 miles of pavement within the City of Ontario. Work includes partial depth pavement replacement, milling, asphalt pavement, minor guardrail and drainage work. 115005~|~1~|~1~|~01/MPO/SPR~|~Improvements to the intersection of Central Avenue and Edgebrooke Drive including installation of a new traffic signal, pedestrian crosswalks and sidewalks. 114314~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP/OT/ " -Plan Split 1 101723~|~1~|~1~|~01/SAF~|~Install new guardrail along MRG CR 2A, 3, and 84. Work will include posts and railing. Funded 100% federal. 95351~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay and abutment patching. GAL 35 13.78 L&R, (SFN 2701103 L) and (SFN 2701081 R). NHS route funded 80 federal/20 state. 106283~|~1~|~1~|~01/NFP~|~Pavement markings along various routes in Ashtabula, Mahoning and Trumbull Counties. 103289~|~1~|~1~|~01/NFP~|~Pavement plan split 117148~|~1~|~1~|~01/STR~|~Landslide repair project using excavation/dump rock. GAL 553 0.61-0.62. 107442~|~1~|~1~|~01/NFA~|~AC overlay with repairs 105211~|~1~|~1~|~01/STR~|~Resurfacing POR SR 88 from 4.03 to 7.95 and POR SR 303 from 13.04 to 13.21. 105211~|~1~|~2~|~02/STR~|~See linked structures 10' to 20' span. 124558~|~1~|~1~|~01/NHS~|~Intersection improvement project, WAS 7 14.10 Logistics Lane. Construction of RCUTs at Veto Rd, CR 3, and Gravel Bank Rd, TR 482. Roadway reconstruction or widening of WAS-CR10-0.00-1.69 and WAS-TR482-0.00-0.30. 113819~|~1~|~1~|~01/NFA~|~Bridge replacement: Replace an existing prestressed box beam over the CSX railroad with a new structure. 87670~|~1~|~1~|~01/STR~|~A slide repair at WOO SR65 4.37-4.38 103139~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY22 Construction Engineering Services 103139~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY23 Construction Engineering Services 100755~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. ATH 356 1.51-4.77. Rural other federal aid funded 80 federal/20 state. 100755~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. ATH 356 0.00-1.51 and VIN 356 0.00-5.97. Not on any federal aid system funded 100% state. 96616~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. The bond funds SAC 7BPB are to be used before the SAC 4PS7 funds. 86294~|~1~|~1~|~01/STR~|~Bridge replacement over north branch of Kokosing river. SFN 5900816 105748~|~1~|~2~|~02/NHS~|~Reactive Maintenance - AC Inlay on WAY-30 and CRA-30. No bridge work 105748~|~1~|~4~|~04/NFA~|~AC Overlay w/ Repairs on WAY-TR80347 (East Old Lincoln Way). No bridge work 105748~|~1~|~1~|~01/STR~|~Reactive Maintenance - AC Inlay on MED-57-3.49 to 8.828. No bridge work 105748~|~1~|~3~|~03/S>2~|~Reactive Maintenance - AC Inlay on MED-57-8.828 to 10.390. No bridge work 101168~|~1~|~1~|~01/NHS~|~Overlay US 68 in Clark County with asphalt concrete: CLA US 68 SLM 7.66 to 12.39 124596~|~1~|~1~|~01/S5K~|~Roadway work on CR 35 123295~|~1~|~1~|~01/S5K~|~Construction of a roundabout at the ATH 682/Luhrig-Armitage Road intersection. 93672~|~1~|~1~|~01/SAE~|~Construct sidewalks and pedestrian signals along SR304 and side streets near Liberty school campus. 102870~|~2~|~3~|~03/S<2~|~Slide repair along STA US62 from SLM 4.60 to SLM 4.63. 102870~|~1~|~2~|~02/S<2~|~Structure replaced with fill and new road. 102870~|~1~|~1~|~01/S<2~|~Deck replacments. 102870~|~3~|~4~|~04/S<2~|~Resurfacing of STA US62T from 0.60 to 1.73 eastbound, 1.08 to 2.35 westbound and 4.40 to 4.67 in both directions and STA SR 225 from 0.37 to 0.76, includes wet reflective pavement markings on STA US 62T from 0.00 to 4.67. 102870~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 89004~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill 90365~|~1~|~1~|~01/NHS/Cant~|~Streetscape/economic development project to improve traffic flow and safety. Address roadway pavement, curbs, sidewalks, ramps, crosswalks, lights. 90365~|~1~|~2~|~02/CMQ/CANT~|~Portion of roadway (20%) accommodating two bike lanes and signal work. 120933~|~1~|~1~|~01/BRO~|~Plan split for rehabilitation of existing bridge carrying SR 83 over Martin's Creek by replacing the deck slab and abutment breastwalls. The pier piling will also be encased. In stream work is required. This PID is to be combined with PID 97498 and placed on the Sept 2024 Programmatic due to the similarity in project work. 100280~|~1~|~1~|~01/IMS~|~Microsurfacing SUM-IR 480-0.00 to 8.67. 122689~|~1~|~1~|~01/IMS~|~Install median cable barrier 97374~|~1~|~1~|~01/ENH~|~NCIT in Bellevue 105036~|~1~|~1~|~01/ENH/MTVE~|~City of Mount Vernon TA Funding - 4B37 (80% Federal) / LNTP (TRC 15% Federal) LNTP (5% Local) - See CAP Comments - Construction of multi-use path under SR13 joining the Kokosing Gap Trail to the Heart of Ohio Trail. 113868~|~1~|~1~|~01/SAF~|~Install new mast arm traffic signal at the intersection of Salem Ave. (SR 49) & Westbrook Road. In addition, removal of pork chop island and installation of right turn lane on Westbrook Rd. 85086~|~1~|~3~|~03/S<2~|~03/S<2/PV This Plan split is for work that is inside the Defiance Urban Area but outside the City of Defiance. It is for the portion of SR 18 that is outside the City of Defiance to the Urban Area Boundary which is at 28.30. All funds in this split will be from the District Preservation Program Budget. There are no local funds in this split. 85086~|~1~|~2~|~02/S<2~|~02/S<2/PV This split for resurfacing the portion of the project that is inside the City of Defiance. The City of Defiance is responsible for the 20% non-federal match. The 80% federal funds will be from the District Preservation Program Budget. 85086~|~1~|~1~|~01/NFA~|~01/NFA/PV This split is for SR 18 from 31.08 to the Henry County Line. This section of SR 18 is a Rural Minor Collector and cannot use federal funds for resurfacing. 85086~|~1~|~4~|~04/STR~|~04/STR/PV This split is for work eligible for rural STP funds. It is for all of SR 281 that is in the project and SR 18 from 28.30 to 31.08. There are no local funds in this event. All funds are from the District. 85086~|~1~|~5~|~05/S<2~|~05/S<2/PV/DEF This split is for items paid 100% by the City of Defiance. Specialized pavement markings requested by the City of Defiance on routes within the city limits. 119264~|~1~|~1~|~01/SAF/STCE~|~Restripe pavement markings. 100337~|~1~|~2~|~02/S<2~|~Microsurface various routes DAR SR 118 1.90 - 2.66 100337~|~1~|~1~|~01/STR~|~Microsurface various routes in Clark, Champaign, Darke & Miami counties: CHP SR 235 0.00 - 6.59 CHP SR 560 0.00 - 2.76 CHP SR 814 0.00 - 3.07 CLA SR 235 9.00 - 11.83 DAR SR 118 2.66 -7.58 DAR SR 121 19.08 - 24.36 MIA SR 48 SLM 5.29 to 5.70 MIA SR 48 5.70 - 8.74 MIA SR 48 14.60 - 16.88 115084~|~1~|~1~|~01/NFP~|~repave the Carlisle Visitor Center roadway and parking area 98651~|~1~|~1~|~01/ENH~|~Installation of 10' multi-use path along Oldman Road. 99951~|~1~|~1~|~01/SAF~|~Re-striping various county routes in Stark County. 97727~|~1~|~1~|~01/S>2~|~Replace deck parapets and convert abutments to semi intergral. 97727~|~1~|~2~|~02/S>2~|~Damage repair 95297~|~1~|~1~|~01/IMS~|~SFN 4805372, SR-51 bridge over I-75 in Toledo. 124916~|~1~|~1~|~01/NHS~|~Culvert rehab. 117508~|~1~|~1~|~01/BRO~|~CEAO LBR fund eligible work to rehab east structure SFN 1834533 only. 117508~|~1~|~2~|~02/NFP~|~Work on west structure SFN 1834541 at 100% Local Cost. 105290~|~1~|~1~|~01/STR~|~Resurfacing of CAR-164, JEF-164 and COL-164 112185~|~1~|~1~|~01/IMS~|~Guardrail repairs/replacements on various routes in District 4. 100607~|~1~|~1~|~01/STR~|~1" FGP overlay of COL-518 103866~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster STP resurfacing project. - 4TA7 (80% Federal) using TRC (15% Federal) and LNTP (5% Local Match) - Resurfacing Fai-CR 505-00.00 to 01.24 (Pierce Avenue). 119166~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MRG-78-18.91-30.64. 119166~|~1~|~2~|~02/NFA~|~Resurfacing project using an asphalt overlay treatment on MRG 607 0.00-1.68. Not on the federal aid system funded 100% State. 105336~|~1~|~1~|~01/STR~|~AC overlay without repairs on rural route: CLA US 42 SLM 0.00 to 4.44 120263~|~1~|~1~|~01/S>2~|~Plan split for federally eligible items in the construction contract subphase 116442~|~1~|~1~|~01/BRO~|~Replace structure HAS-519-0606 (SFN 3402894) with a new structure. 122287~|~1~|~1~|~01/BRO~|~Bridge work. 123633~|~1~|~1~|~01/S>2~|~Plan split for STP > 200,000 120048~|~1~|~1~|~01/NHS~|~Includes work on GRE-35-00008L/R Dayton / Xenia Rd bridges. 124334~|~1~|~1~|~01/SAF~|~Intersection improvement 118136~|~1~|~1~|~01/MPO~|~MPO STBG funding 25496~|~1~|~1~|~01/S<2/NP~|~Urban system paving in the City of New Philadelphia; eligible items include asphalt pavement, long line pavement markings 25496~|~1~|~3~|~03/NHS/NP~|~Urban system paving in the City of New Philadelphia; eligible items include asphalt pavement, long line pavement markings; NHS portions of SR 39/SR 800 at 80%/20%. 25496~|~2~|~2~|~02/S<2/NP~|~Urban system paving in the City of New Philadelphia on SR 39, 416 and 800; includes curb ramps, aux, pavement marking, loops 102923~|~1~|~1~|~01/STR~|~STP Rural funding. 83843~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 724 0.00-1.30, NOB 260 0.00-1.90, 3.75-14.35, NOB 724 0.00-2.75, and NOB 761 0.00-1.90. Includes NOB 724 0189 (SFN 6105076). 121002~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 149 over abandoned railroad. 122197~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-A 122197~|~1~|~2~|~02/NFA~|~NEVI Round 2B I-71-A 96444~|~1~|~1~|~01/SAF~|~Tyre grip or micro surfacing of various portions of routes in project. 83260~|~1~|~1~|~01/NHS~|~Bridge replacement project. WAS 550 2095. SFN 8402094. NHS route funded 80 federal/20 state. 89424~|~1~|~1~|~01/S<2~|~ADA Ramp, mill and fill and base repair on John Street from fountain to yellow springs, Kenton from Burnett to East, mcCreight from Fountain to Plum, and Limestone from Pleasant to Spring. 98400~|~1~|~1~|~01/STR~|~ASD-095-1.46-13.5 Resurfacing 89490~|~1~|~1~|~01/NFP~|~Construct noise wall on north side of IR-70 from US-33 to Big Walnut Creek 99877~|~1~|~1~|~01/S>2~|~Mill & fill East River Road. 101554~|~1~|~1~|~01/STR~|~RIC-546-0.00 to 9.28 Microsurfacing 123872~|~1~|~1~|~01/MPO/ALLI~|~Signal upgrades. 119248~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing of US42. 115178~|~1~|~1~|~01/S>2~|~Reconstruction of the existing roadway. Curbs, sidewalks, driveway approaches, and lighting, traffic signals, signage, pavement markings, and a buried interconnect will be rebuilt to replace existing. There will be minor storm sewer work including new manholes, catch basins, and some pipe replacement. 90640~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 111282~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project on ATH 682 4.70-6.07 and ATH 691 8.78-9.25 with an asphalt overlay treatment. Funded 80 federal/20 state. 111282~|~1~|~2~|~02/STR~|~Two-lane resurfacing project. ATH 691 0.00-8.78 with an asphalt overlay treatment. Funded 80 federal/20 state. 114803~|~1~|~1~|~01/STR~|~Rural plan split. 114803~|~1~|~2~|~02/S>2~|~Columbus urban area plan split. 88718~|~1~|~1~|~01/STR~|~0103780 ADA SR247 8.82 Intersect: S Br Of Lick Fk Oh Brs CkBrdg Replacement 80 Fed/20 State. 01/STR/BR/State 102668~|~1~|~1~|~01/S>2~|~Fine Graded Polymer AC Overlay on:WAR SR 63 SLM 0.85 to 0.86WAR SR 63 SLM 2.89 to 3.38WAR SR 741 SLM 3.66 to 6.05WAR SR 741 SLM 6.52 to 7.08AC overlay with repairs on:WAR SR 63 SLM 0.86 to 1.24WAR SR 63 SLM 1.24 to 2.89WAR SR 63 SLM 3.38 to 5.26AC overlay without repairs on:WAR SR 741 SLM 6.05 to 6.52 102668~|~1~|~2~|~02/S>2~|~WAR-741-0494: SFN 8302345 over a Tributary of Little Muddy Creek. 1. Patch the wearing surface with concrete per Proposal Note 512, Type B. Include a note requiring to only repair portions of the wearing surface that are visibly spalled, patched with asphalt, patched with concrete, or are unsound AND contiguous with one of these areas. Do not patch areas that are unsound but are not visibly distressed. Include a quantity of 35 SY to be used as directed by the Engineer. 2. Retrofit the guardrail on the structure per DBR-3-11. 3. Replace the approach guardrail and end terminal assemblies to meet new MGS guardrail requirements. 102668~|~1~|~3~|~03/SAF~|~Centerline rumble stripes. 102668~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 101051~|~1~|~1~|~01/STR~|~Chip seal various routes in Auglaize and Logan Counties: AUG SR 29 SLM 6.40 to 9.67 = = AUG SR 197 SLM 5.16 to 7.44 = = LOG SR 508 SLM 1.29 to 9.46. 101051~|~1~|~3~|~03/S<2~|~Chip seal various routes in Auglaize and Logan Counties: AUG SR 29 SLM 5.31 to 6.40 = = LOG SR 720 SLM 3.15 to 4.12. 101051~|~1~|~2~|~02/NFA~|~Chip seal various routes in Auglaize and Logan Counties: AUG SR 720 SLM 0.00 to 2.81 = = LOG SR 720 SLM 0.00 to 3.15. 114209~|~1~|~1~|~01/BRO~|~Replacement of Bridge No. CLE-CR 106-3.03 (SFN: 1359223) 116429~|~1~|~1~|~01/MPO~|~Resurface Laskey from Monroe to Talmadge, omitting Flanders intersection. 104099~|~1~|~1~|~01/STR~|~Split for bridge replacement at 80% federal and 20% state 120358~|~1~|~1~|~01/NFP~|~Systematic guardrail repairs/replacements and maintenance on various routes throughout District 4. 113070~|~1~|~1~|~01/STR~|~Crack sealing on:DAR-US-36 SLM 9.61 to 13.08DAR-US-127 SLM 9.50 to 9.69DAR-US-127 SLM 13.16 to 16.66DAR-SR-47 SLM 0.79 to 10.07DAR SR-49 SLM 0.00 to 12.19DAR-SR-571 SLM 13.65 to 24.88 109885~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2025. Funded 100% state. 110818~|~1~|~1~|~01/NFP~|~ODNR Roadway Maintenance Program project to resurface the London Fish Hatchery 109759~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge cleaning and sweeping on Interstate bridges listed above. 109759~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge cleaning and sweeping on NHS bridges listed above. 109759~|~1~|~3~|~03/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge cleaning and sweeping on OFAH-Urban bridges listed above. 109759~|~1~|~4~|~04/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge cleaning and sweeping on OFAH-Rural bridges listed above. 109759~|~1~|~5~|~05/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Bridge cleaning and sweeping on NOFAS-Rural bridges listed above. 108398~|~1~|~1~|~01/NFP~|~Tree cutting plan split; 101533~|~1~|~1~|~01/NHS~|~DSR# BEL-026 93904~|~1~|~2~|~02/NFP~|~Reconstruction of East Xenia Drive, from just east of East Dayton Drive to the end of project, where the proposed side path meets existing. 93904~|~1~|~1~|~01/CMQ~|~Construction of a 10 foot wide bike path to connect the existing bike path at Central Avenue and South Street, through Central Park and along railroad property to Xenia Drive. Bike path will cross the railroad tracks on the south side of Xenia Drive and will connect to the existing bike path located at the Calamityville property. 91327~|~1~|~1~|~01/NHS~|~Replace one bridge. 107255~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 12.90. GSM funded. Not on any federal aid system funded 100% state. 96661~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. NOB 285 5.55-14.47. Rural other federal aid funded 80 federal/20 state. 84999~|~1~|~1~|~01/CMQ~|~ Install a traffic responsive closed-loop system consisting of new controllers, new system software, LEDs, and radio interconnect. The Central Avenue Corridor consists of six traffic signals. Central Avenue-Ohio Street to Broad Street in Fairborn 86843~|~1~|~1~|~01/NHS~|~Add turn lanes at Central/Holland-Sylvania intersection. 114493~|~1~|~1~|~01/NHS~|~FY26 Chipseal 102867~|~1~|~1~|~01/NFP~|~All work in project. 100% state funds from the District Preservation Program budget. SAC 4PS7 111354~|~1~|~1~|~01/NFP~|~Resurfacing in Hueston Woods State Park. 95169~|~1~|~1~|~01/STR/PCEO~|~CEAO Funded 4B77 (80% Federal) / 4BG7 (20% Local) - Perry County resurfacing project of County Road 6 from 00.38 to 6.37. 96493~|~1~|~1~|~01/SAF~|~Widening of the two lane section of Yankee Road between Dutchland Parkway and Princeton Road to a three lane section. The intersection of Yankee Road and Princeton Road will be converted to a roundabout. A concrete sidewalk will be constructed along a portion of Yankee Road. 92638~|~1~|~1~|~01/SAF~|~Modify the interchange at Intersate 275 & US-42 115796~|~1~|~1~|~01/S<2/CAMB~|~"01/S>2/PV/CAMB" - 80% Federal (4B97), 15% TRC, 5% Local (LNTP) - reconstruction of Edgeworth Avenue from N 10th Street to Clark Street 115796~|~2~|~2~|~02/ENH/CAMB~|~"02/ENH/OT/CAMB" - 80% Federal (4B37), 15% TRC, 5% Local (LNTP) - enhancements along Edgeworth Avenue from N 10th Street to Clark Street - Initial Award amount capped $315,367 at 95%. 87302~|~1~|~1~|~01/STR~|~general system resurfacing of CAR-39-10.23 to 14.25; includes pavement repairs and pavement marking 101238~|~1~|~1~|~01/NFP~|~Cold Storage facility at the Dorset Outpost in Ashtabula County. 104274~|~1~|~1~|~01/MPO~|~plan split 113598~|~1~|~1~|~01/NHS~|~Split for paving work on the NHS (west of SR-237) 113598~|~1~|~2~|~02/S>2~|~Split for paving work on the STP system (East of SR-237) 113598~|~1~|~3~|~03/NFP~|~Split for 100% local items of work 109982~|~1~|~1~|~01/STR~|~Landslide repair project from OH2019-01, DSR WAS-001. Funds 80% Federal ER/20% State ER. WAS 555 5.55-5.64. 115172~|~1~|~1~|~01/S>2~|~AC Overlay w/Rpr WAY SR 585 17.450 TO 18.469 115172~|~1~|~2~|~02/S>2~|~Bridge Work to be determined later. 101815~|~1~|~1~|~01/NHS~|~Bridge maintenance on 25 bridges on SR 126 in Hamilton County. 98184~|~1~|~1~|~01/STR~|~STP Rural Paving 80/20 Fed/State PIC-188-1.44 to 1.68; 2.57 to 8.03 98184~|~1~|~2~|~02/S<2~|~STP Urban Paving Circleville 80/20 PIC-188-1.68 to 2.57 87588~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Crack sealing on Lic-IR 70-(15.96-29.42), Mus-IR 70-(00.00-01.46), Mus-IR 70-(13.12-27.35) 87588~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Crack sealing on Fai-USR 22-(18.57-26.07), Mus-SR 93-(00.25-03.46), Per-USR 22-(00.00-06.77), Per-SR 93-(17.89-20.52), Per-SR 669-(00.00-06.34), Per-SR 669-(06.97-09.72) 87588~|~1~|~4~|~04/S>2~|~"04/S>2/PV/ " - Disrtict Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing of Fai-SR 256-(05.99-06.54) 87588~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - crack sealing portions of Fai-USR 33-(00.00-06.56), Mus-SR 93-(00.00-00.25), Mus-SR 93-(03.46-04.72), Per-SR 93-(20.52-25.99) 102513~|~1~|~1~|~01/S>2~|~Repair and resurfacing FRA-315-12.91 to 13.80; DEL-315-0.00 to 0.90; DEL-315-1.77 to 2.69; DEL-315-2.83 to 4.07; DEL-315-8.41 to 8.56 102513~|~1~|~2~|~02/STR~|~Repair and resurfacing DEL-315-4.11 to 8.41 116332~|~1~|~1~|~01/NHS~|~Plan split for the pavement work on GRE-35 87380~|~1~|~1~|~01/S<2~|~"01/S<2/PV/Steu" - 80% Federal/20% Local funding intended for non-intersection or non-CMAQ eligible plan items. 87380~|~3~|~3~|~03/CMQ~|~"03/CMQ/OT/Steu" - 100% CMAQ. Intended for all 100% CMAQ eligible items; lighting and signal work. 87380~|~2~|~2~|~02/CMQ~|~"02/CMQ/OT/Steu" - 80% CMAQ/20% Local funding. Intended for those items that are CMAQ eligible, but not eligible for 100% CMAQ. 115482~|~1~|~1~|~01/NFP~|~Split for non-PID related charges for PID 112423 109245~|~1~|~1~|~01/SAF~|~Guardrail upgrade project on various county routes and section in MOE County. Funded 100% federal. 122980~|~1~|~1~|~01/S5K~|~All work included in this plan split. 97024~|~1~|~1~|~01/NFP~|~Paving at the Expo Center 111310~|~1~|~1~|~01/BRF~|~Muskingum County Engineer project to replace existing bridge on CR5 over Salt Creek (SFN 3033880). 4C87 - See Cap comments 106748~|~1~|~1~|~01/MPO~|~Work to install new sidewalks that is eligible for federal-aid 116562~|~1~|~1~|~01/IMS~|~Plan split for bridge sealing on HAM-75 bridges 100295~|~1~|~1~|~01/STR~|~Landslide repair project. VIN 50 4.53-4.67. DSR VIN-002. Funded 100% federal. 115098~|~1~|~1~|~01/STR~|~Slide repair 115098~|~2~|~2~|~02/STR~|~Slide repair(s) by drilled shaft retaining walls. 104113~|~1~|~1~|~01/SAF~|~Bridge Guardrail replacement along various routes throughout Stark County. 87940~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7 (80% Federal)/4PS7 (20% State) - No CAP - Length -27' SD(1) SR 65.0 DSR= 4 Treatment =Replacement of bridge 1602349 COS SR541 13.48 Intersect: Moscow Brook 100047~|~1~|~1~|~01/CMQ~|~Construction of a 10' shared use path from Fairbanks Avenue (near Boldface Park) to the Gilday Riverside Playfield. 93496~|~1~|~3~|~03/IMS~|~Bridge replacement - existing bridge width 93496~|~1~|~4~|~04/NHS~|~Work due to widening of existing bridges 93496~|~1~|~5~|~05/IMS~|~Remove trees and clean ditch to restore flap gate and ditch flow 93496~|~1~|~1~|~01/IMS~|~Rehabilitation of existing pavement, SLM 1.41 to 1.83 93496~|~1~|~2~|~02/NHS~|~Widening of existing pavement, SLM 1.41 to 1.78 93496~|~1~|~6~|~06/IMS~|~Pavement Repairs of SLM 0.00 to 1.41 and 1.83 to 5.29 93496~|~1~|~7~|~07/IMS~|~Repair damage caused by vehicle accidents 92055~|~1~|~1~|~01/ERD~|~Plan Split for TRU Warren Mahoningside Bikeway 105465~|~1~|~1~|~01/STR~|~MICROSURFACING DEL 229 FROM 7.44 TO 8.56. 105465~|~1~|~2~|~02/STR~|~PROGRAMMED PER 2-27-2017.XLS 112471~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 107808~|~1~|~1~|~01/S<2~|~General System (Urban Area) Plan Split: UNI-4-14.06-14.88 107808~|~1~|~2~|~02/STR~|~General System (Rural) Split: UNI-4-14.88-24.35 UNI-37-5.30-5.83 107808~|~1~|~3~|~03/S<2~|~Urban Paving Plan Split: UNI-4-13.61-14.06 107808~|~1~|~4~|~04/SAF~|~Items associated with Center line Rumble stripes 105666~|~1~|~1~|~01/STR~|~PIK 104 3.17 93793~|~1~|~1~|~01/NFP~|~100% 4PS7 funding for pilot lighting contract in FRA County01/NFP/OT/ 113474~|~1~|~1~|~01/SAE/PICK~|~City of Pickerington SRTS Funding - 4HJ7 (100% Federal) - See CAP Comments - addition of sidewalks along Long Street and West Columbus Street. 104009~|~1~|~1~|~01/SAF~|~Construct an RCUT design at the intersection of US 127 and Kruckeberg Rd. 109858~|~1~|~1~|~01/STR~|~Overlay on HIG 73. 87744~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 87744~|~1~|~2~|~02/NHS~|~Bridge work to be determined. 118647~|~1~|~1~|~01/S50~|~Shave/Pave and add pavement markings 98380~|~1~|~1~|~01/STR~|~Resurfacing POR SR 88 from 7.42 to 10.88 98380~|~1~|~2~|~02/S<2~|~Resurfacing POR SR 88 from 10.88 to 11.13. 98380~|~1~|~3~|~03/STR~|~See linked structures. 102595~|~1~|~1~|~01/STR~|~This project is to cover the federally mandated sign upgrades for rural curves on two lane roads. 95243~|~1~|~1~|~01/MPO/PORT~|~The PORT is construction a new access raod for Minova USA Inc., and their new facility being built within the Law. Co. Economic Development Corporations industrial park leading to Old County Road 1. The project consists of full depth roadway construction to include curbs and gutters. The PORT is the project manager and owner of the industrial park. This will be a locally managed proejct with the lead for the construciton being the PORT. 118127~|~1~|~1~|~01/MPO~|~MPO STBG funds 96251~|~1~|~1~|~01/STR~|~100% 4PS7 - Construction Inspection 115520~|~1~|~1~|~01/BRF/ASD~|~Bridge Replacement 102882~|~1~|~1~|~01/STR~|~STP rural pavement 97480~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 0.93. Type B Emergency. Rural other federal aid funded 80 federal/20 state. 119535~|~1~|~1~|~01/SAF~|~Offset right turn lane for Union Avenue. MEG 7 5.23-5.39. 114949~|~1~|~1~|~01/STR~|~Box beam/deck replacement. 114958~|~1~|~1~|~01/STR~|~SDC bridge overlays and other various repairs. 114958~|~1~|~2~|~02/S<2~|~SDC Bridge overlays and other various repairs. 120685~|~1~|~1~|~01/NFP~|~Tree Cutting on MEG 33 13.96-28.74. Funded 100% State. 103818~|~1~|~1~|~01/MPO~|~Resurfacing of Portage Lakes Drive (CR 75). 95743~|~1~|~1~|~01/STR~|~SR-281 from SLM 9.91 to SLM 19.95 101360~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. GAL 141 16.07-17.80. Rural other federal aid funded 80 federal/20 state. 101360~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. GAL 141 17.80-21.44. Urban other federal aid funded 80 federal/20 state. 107660~|~1~|~1~|~01/STR~|~Pavement repair on SR 49 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). 87230~|~1~|~1~|~01/STR~|~0102679 ADA SR73 6.41 Intersect: Crooked Creek 80 Fed/20 State. 01/STR/BR/State 103814~|~1~|~1~|~01/SAF~|~District wide guardrail project to replace Type A anchor assemblies for FY2017. Locations TBD. 98705~|~1~|~1~|~01/SAE~|~100% Sate Safety funds to improve the skid resistance at spot locations. 116501~|~1~|~1~|~01/NFA~|~Added plan split. 116501~|~1~|~2~|~02/STR~|~Added plan split. 110812~|~1~|~1~|~01/NFP~|~ODNR Roadway Maintenance Program Resurfacing of Mosquito Lake Road 1 in Mosquito State Park 116703~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing 98390~|~1~|~2~|~02/S<2~|~Resurfacing ATB SR 84 from 20.28 to 20.38 and SR 193 from 28.68 to 29.99. 98390~|~1~|~1~|~01/STR~|~Resurfacing ATB US 6 from 25.18 to 29.95, ATB SR 84 from 20.38 to 21.80 and ATB SR 193 from 25.97 to 26.43. 98390~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 98390~|~1~|~4~|~04/STR~|~Minor bridge work 10' to 20' span. 98390~|~1~|~5~|~05/SAE~|~Adding rumble stripes. 93833~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: On SR134, located 1.30 miles north of US50. Project Description: It is proposed to replace the structure, SFN 3602710. 80/20 split01/STR/BR/State 88816~|~1~|~1~|~01/NHS~|~Bridge Replacement 98683~|~1~|~1~|~01/S<2~|~MCEWEN ROAD BRIDGE REHABILITATION. Rehabilitate existing 3-lane, 4-span slab bridge carrying McEwen Rd over Holes Creek. Remove and replace deteriorated slab edges, install new twin steel tube guardrail and steel drip strip full length on both sides. Jack and temporarily support slab end spans to allow reconstruction of deteriorated abutments on existing steel piles, in accordance with new ODOT SCD CPA-1-08. Remove and replace approach slabs upon completion of abutment reconstruction. Repair pier pile section loss at waterline and protect pier piles with concrete encasements. 111370~|~1~|~1~|~01/SAF/KCEO~|~Knox County Engineer's FY2025 pavement marking project funded by CEAO. 4HB7 - see cap comments. 119680~|~1~|~1~|~01/SAF~|~Work associated with mid-block crossing of SR-28. 120129~|~1~|~1~|~01/S>2~|~Plan Split for STRS funding 120129~|~1~|~2~|~02/NFP~|~Plan split non-eligible work items at 100% local cost. 123249~|~1~|~1~|~01/S5K~|~Traffic Signal Replacement 96684~|~1~|~1~|~01/ENH/PATA~|~City of Pataskala TA Project - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Installation of sidewalks along Taylor Road in the City of Pataskala 112784~|~1~|~1~|~01/NHS~|~Resurfacing of TRU US 62 from 5.64 to 9.02 112784~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span 121113~|~1~|~1~|~01/STR~|~Plan split for FUL-20A-22.89 culvert 124994~|~1~|~1~|~01/S>2~|~Plan split for resurfacing STP Urban roadway 124994~|~1~|~2~|~02/STR~|~Plan split for resurfacing STP Rural roadway 97129~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 13 2.69, SFN 0500135. Rural other federal aid funded 80 federal/20 state. 116356~|~1~|~1~|~01/STR/NEAL~|~City of New Albany's Funding - LNTP (100% Local) - No CAP Widening intersection enhancements to CR 41 82861~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and overlay treatment. MEG 32 0.00-3.82. NHS route funded 80 federal/20 state. 114276~|~1~|~1~|~01/IMS~|~Mowing contract in District 8 116050~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/CV/ - 83994~|~1~|~1~|~01/STR~|~general system resurfacing HOL-US 62 from Millersburg to Berlin; includes pavement, pavement repairs, pavement marking, shoulder repairs 120504~|~1~|~1~|~01/BRO/Plym~|~Replacement of the Baseline Road bridge over the Ashland Railway RR 111270~|~1~|~1~|~01/ENH~|~Muskingum Valley Park District approved TA project for construction of multi-use path from Dresden (TR-417, Rock Cut Road approx. 1.91) to Ellis Dam (TR-49, Ellis Dam Road approx. 0.57). 4B37 Enhancements - see Cap Comments 75941~|~1~|~1~|~01/IMS~|~Microfurface IR 70 in Montgomery County:MOT IR 70 SLM 0.00 to 6.71 114708~|~1~|~1~|~01/NHS~|~Construction of noise walls. 114708~|~2~|~2~|~02/IMS~|~Construct noise walls. 114543~|~1~|~1~|~01/BRF~|~Replacing structure. 95910~|~1~|~1~|~01/NFP~|~Removal of UFST 110500~|~1~|~1~|~01/SAF~|~Safety funded Plan split 110500~|~2~|~2~|~02/NHS~|~Adding fuel price adjustment 81250~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 6003664 MUS IR70 24.54 Intersect: CR 436 Moose Eye #; Not BR Eligible for Rehabilitation: Length=302 SD/FO(0) SR=88.9 DSR=8 92704~|~1~|~1~|~01/MPO~|~Resurfacing CR 7026 0.00 - 2.78 84904~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 93155~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1602071 COS SR93 14.66 Intersect: White Eyes Creek; Not BR Eligible for Rehabilitation: Length=112 SD/FO(0) SR=97.8 DSR=6 84582~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% federal STP) / 4PS7 (20% state) - No cap - Bridge number WYA-53-2416, SFN 8801940. 84582~|~2~|~2~|~02/BRO~|~District Preservation 4PF7/4PS7 (80/20) - No Cap - Bridge Number WYA-53-2185; SFN 8801924. This is for part 2 of the project. The design was done with WYA SR 53-21.85, PID 100734. 95418~|~1~|~1~|~01/STR/ROS~|~Rural Portion: SLM 4.98 to 8.29 then 9.15 to 13.44 (Maple Grove Rd.)80/20 local match 95418~|~1~|~2~|~02/S<2/ROS~|~Urban Portion: SLM 13.44 (Maple Grove Rd.) - 15.7380/20 local match 95725~|~1~|~2~|~02/NHS~|~Culvert at FUL-20-25.10 95725~|~1~|~1~|~01/NHS~|~FUL-20 from SLM 13.54 to SLM 27.91 95725~|~1~|~3~|~03/NHS~|~SFN 2600374 109068~|~1~|~1~|~01/NHS~|~Plan split SRTS 123737~|~1~|~1~|~01/STR~|~Plan split for resurfacing on rural general system 116684~|~1~|~1~|~01/NHS~|~All work is in this plan split. 123400~|~1~|~1~|~01/STR~|~Rural 102810~|~1~|~1~|~01/NFP~|~Miscellaneous charges not eligible for project specific participation. 98773~|~1~|~1~|~01/NFA~|~Replace SFN 7844891 Burnett East Road bridge over Sugar Creek. 95960~|~1~|~1~|~01/NFA~|~Ohio Rail Development Commission 122404~|~1~|~1~|~01/IMS~|~All items of work associated with installing fiber and CCTV cameras along I-71. 95503~|~1~|~2~|~02/STR/ALLC~|~Work outside the Delphos Urban Area. From the Delphos Urban Area Boundary at 0.60 to the end of the project at Baugh Road at 2.32. Federal MPO-STP funds with the non-federal match provided by the Allen County Engineer. Rural STP funds. 95503~|~1~|~1~|~01/S<2/ALLC~|~Work inside the Delphos Urban Area. From the beginning of the project at the City of Delphos Corporation Limits at 0.15 to the Delphos Urban Area Boundary at 0.60. Federal MPO-STP funds with the non-federal match provided by the Allen County Engineer. Urban STP funds. 111599~|~1~|~1~|~01/MPO~|~For federally eligible expenses in construction and CE of SAC 4TA7 (NOACA) 98492~|~1~|~1~|~01/STR~|~WAY-585-3.30-3.98 / 7.38-11.89 Resurfacing 98492~|~1~|~3~|~03/S<2~|~WAY-585-2.20 to 2.38 - City of Wooster Urban Paving - 80/20 FED/City 98492~|~1~|~4~|~04/S<2~|~WAY-585-2.20 to 2.38 - City of Wooster Urban Paving - 100% City 98492~|~1~|~2~|~02/S<2~|~WAY-585-3.41 to 7.38 Resurfacing 98492~|~1~|~5~|~05/STR~|~Bridge work 98492~|~1~|~6~|~06/S<2~|~Bridge Work for STP < 200000 114946~|~1~|~1~|~01/IMS~|~Structural steel and bearing repairs. 109768~|~1~|~1~|~01/NHS~|~AC overlay without repairs 109768~|~1~|~2~|~02/STR~|~AC Overlay with repairs 92669~|~1~|~1~|~01/MPO~|~Resurfacing CR 133 0.89 - 1.68 86833~|~1~|~2~|~02/S<2/Ox~|~Urban Paving for the City of Oxford in FY2013. This project will resurface a portion of SR 732 from Oxford Reily Rd (SLM 7.82) to the intersection of Main & Chestnut (SLM 8.69). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 86833~|~1~|~1~|~01/S<2/Ox~|~Urban Paving for the City of Oxford in FY2013. This project will resurface a portion of SR 732 from Oxford Reily Rd (SLM 7.82) to the intersection of Main & Chestnut (SLM 8.69). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 92962~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation Pavement Marking 4MP7(100% State) - No CAP - Striping and Raised Pavement Marker costs due to resurfacing on PER SR757 0-5.68 92962~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on PER SR757 0-5.68 116475~|~1~|~1~|~01/NFA~|~Overlay in Highland County. 116475~|~1~|~2~|~02/NFA~|~added BR plan split. 116303~|~1~|~1~|~01/S<2~|~Chipseal project. 116303~|~1~|~2~|~02/STR~|~Chipseal project. 116908~|~1~|~1~|~01/SAF~|~District-Wide raised pavement markers 116908~|~1~|~2~|~02/SAF~|~District-Wide raised pavement markers 97472~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-CR 31-W247(Rural Dale Road) SFN 6030181 - BR Eligible for replacement: L=33'; SD/FO=1; SR=65.9; DSR=4; 97472~|~3~|~3~|~03/BRF/GCEO~|~"03/BRF/BR/GCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - GUE-CR 366-646(County Road 366) SFN 3030814 - BR Eligible for replacement: L=29'; SD/FO=1; SR=40.8; DSR=N; 97472~|~2~|~2~|~02/BRF/MCEO~|~"02/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-CR 38-W128 (Hamby Hill Road) SFN 6043194 - BR Eligible for replacement: L=112'; SD/FO=1; SR=23.4; DSR=5; 123222~|~1~|~1~|~01/STR~|~Landslide repair using a drilled shaft wall on ATH 329 12.31 and 13.26. 114221~|~1~|~1~|~01/NHS~|~Minor bridge rehab > 20' span. 92616~|~1~|~1~|~01/IMS~|~Removal of ramps N & Q. Reconfigure Ramps P1 & S and signalize intersections at US 23. Add a deceleration lane on US 23. Pavement replacement on Ramps L, M, O, P1, & S 92616~|~1~|~3~|~03/NHS~|~Relocate City of Columbus Department of Power poles in both project parts 92616~|~1~|~2~|~02/IMS~|~Work on two structures (FRA-270-5264 & FRA-23-0517) 92616~|~2~|~4~|~04/NHS~|~Improvements to the intersection of US 23 at Rathmell Rd 92616~|~2~|~5~|~05/NHS~|~Mill & fill US 23 SB from station 525+60.40 to station 546+47.41 109468~|~1~|~1~|~01/MPO~|~Reconstruction of Central Avenue from University Boulevard to Canal Street. Replacement of existing traffic signals, drainage improvements, and streetscape enhancements. 115495~|~1~|~1~|~01/NFP~|~Dead Ash tree removal across the district. 95519~|~1~|~1~|~01/STR~|~Project to field pave the existing 84" x 66" CMP. MER SR 274 3.24. 104839~|~1~|~1~|~01/NFP~|~Split for sign/support upgrade work 104839~|~1~|~2~|~02/NFP~|~Split for sign support work due to vehicle collision. 89420~|~1~|~1~|~01/STR~|~District Wide RPM contract. 116488~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 79662~|~1~|~1~|~01/NHS~|~Priority system resurfacing on FRA-33: SLM 26.12-31.23 (SR-317 to Fairfield County)01/NHS/PV/ 79662~|~1~|~2~|~02/SAF~|~Turn lanes and prohibition of through movement at US 33/Bixby Rd intersection 101200~|~1~|~1~|~01/SAE~|~Construct sidewalk on Riddle from Roberta Avenue to Springfield Pike (SR-4) 115675~|~1~|~1~|~01/NHS~|~All items of work associated with the Re-decking of structures UNI-33-9.10 L&R and UNI-33-11.50 L&R. This work includes MOT items of work and other miscellaneous items of work necessary to complete the bridge work. 115675~|~2~|~2~|~02/NHS~|~All items of work associated with the Superstructure replacement for the UNI-33-785 R and UNI-33-786 L bridges. 115675~|~2~|~3~|~03/NHS~|~All items of work associated with the deck overlay on UNI-33-877 L&R Bridges. 115675~|~3~|~4~|~04/NHS~|~All items of work associated with guardrail work on NHS routes UNI-33 -7.55-12.60 and UNI-36 8.91-9.22 94214~|~1~|~4~|~04/BRO~|~Bridge work funded with District Preservation funds. 94214~|~2~|~6~|~06/BRO~|~Work to rehabilitee the bridges over CR 33 and the abandoned railroad. Design under PID 104095. Funds from the District Preservation Program budget. 94214~|~1~|~2~|~02/IMS~|~Work associated with the approximately one mile of reconstruction from SLM 16.71 to 17.71 on I-75. Major Rehab funds will be used first. If additional funds are needed District Preservation Program funds will be used. 94214~|~1~|~1~|~01/SAF~|~Safety improvements to the southbound entrance ramps of the I-75 and SR 696 interchange as well as the barrier in the area that is being reconstructed. Funding from the Safety Program will be used first until the cap is reached. If funds needed over the Safety Program cap Major Rehab funds will be used. Last if needed will be District Preservation Program funds. 94214~|~2~|~7~|~07/IMS~|~Pavement work using funds from the District Preservation Program budget on IR75 from the bridge over Riley Creek in Allen County to just south of SR235 in Hancock County. Also resurface the ramps at SR 103. Design under PID 104095 94214~|~2~|~8~|~08/SAF~|~Installation of cable barrier on IR75 in Hancock County from approximately SLM 1.29 (CR33/RR Overpass) to approximately SLM 2.79 (start of the mound). Funding from the Safety Program until the cap is reached. District Preservation Program funds will be used after the cap is reached. Design under PID 104095. 94214~|~1~|~5~|~05/SAE~|~Traffic Signals at the top of the ramps at the interchange of SR 696 and I-75. Funding is 100% federal funds from the District Preservation Program budget. 94214~|~1~|~3~|~03/IMS~|~For all pavement work not associated with the approximately one mile of reconstruction in plan split 2. All funds will be from the District Preservation Program budget. 94214~|~1~|~9~|~09/NFP~|~Guardrail damage caused by an uninsured motorist. The District will compensate the contractor for the repairs but we have to use a part code that has 100% state funds as the FHWA will no participate in damage repair due to an uninsured motorist. 89035~|~1~|~1~|~01/CMQ~|~All items of work eligible for CMAQ funding 97025~|~1~|~1~|~01/NFP~|~Resurfacing and other work at Ohio Expo Center 103629~|~1~|~1~|~01/S<2~|~ER slope repair. DSR BEL-009. 104227~|~1~|~1~|~01/NFP~|~plan split 119132~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment. VIN 32 0.00-7.67. 108005~|~1~|~1~|~01/S>2~|~Split for resurfacing in the villages 108005~|~1~|~2~|~02/S>2~|~Split 2 for urban paving resurfacing work 95793~|~1~|~1~|~01/STR~|~from SLM 10.09 to SLM 13.82 95793~|~1~|~2~|~02/STR~|~SFN 8601275 120027~|~1~|~1~|~01/NFP~|~added plan split. 124115~|~1~|~1~|~01/BRF~|~All bridge replacement work included in this split. 113963~|~1~|~1~|~01/NFP~|~Work on various culverts. District preservation funds. 113963~|~1~|~2~|~02/NFP~|~Work on a culvert that meets the state but not the federal definition of a bridge. District preservation funds. 88043~|~1~|~1~|~01/SAE~|~This plan split is for the traffic signal and railroad construction flagging and pre-emption equipment. These funds are from the safety program. 88043~|~1~|~3~|~03/S<2~|~This plan split covers resurfacing pay items (surface and intermediate courses, pavement planing, and lane line pavement marking). 88043~|~1~|~2~|~02/CMQ~|~This plan split is for the roadway work items other than the traffic signal, resurfacing and railroad preemption equipment. 123643~|~1~|~1~|~01/IMS~|~Plan split for guardrail replacement work 123643~|~1~|~2~|~02/IMS~|~Plan split for guardrail maintenance and repair 102497~|~1~|~1~|~01/NFP~|~District Preservation Conduit Funding - 4PS7 (100% State) - No CAP - Culvert repairs for conduits in District 5 105769~|~1~|~1~|~01/IMS~|~Plan split for painting work in the interstate system 112410~|~1~|~1~|~01/IMS~|~AC overlay with repairs on: SHAMIR00075**C 16.42 16.69 SHAMIR00075**C 16.69 16.94 SHAMIR00075**C 16.94 17.23 SHAMIR00075**C 17.23 17.47 102146~|~1~|~1~|~01/STR~|~Bridge replacement PIK SR 220 3.29 (SFN 6602223) 102146~|~1~|~2~|~02/NFP~|~Retroactive fuel price adjustment 103509~|~1~|~1~|~01/STR~|~DSR# BEL-006 111653~|~1~|~1~|~01/NHS~|~Slide repair LAW-52-17.57 114054~|~1~|~1~|~01/STR~|~All work to widen and resurface the roads in this project. 80% federal and 20% local until the cap is reached then 100% local funds. 102122~|~1~|~1~|~01/NHS~|~AWT 104842~|~1~|~1~|~01/MPO~|~Resurfacing Hills & Dales Rd (CR 98) from Massillon East Corp Limit to Brunnerdale Ave. 88769~|~1~|~2~|~02/S<2~|~Remove and replace structure on SFN 1903365 DAR SR 571 1382 (Bridge Creek) 88769~|~1~|~1~|~01/STR~|~Remove and replace the sructure on SFN 1903489 DAR SR 571 1571 dividing branch. 117926~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-A 108262~|~1~|~1~|~01/STR~|~ER slide repair PIK CR 66 2.12. 114611~|~1~|~1~|~01/NFP~|~Plan split for pavement markings 104155~|~1~|~1~|~01/STR~|~PIK 772 13.77 Slide repair. 86661~|~2~|~5~|~05/BRO~|~Bridge work on five structures at 80/20:SFN 2500876 - FRA-23D-2.82 (Third St over Goodale St and N/S RR)SFN 2500868 - FRA-23D-2.95 (I 670 WB to Third St SB ramp over N/S RR)SFN 2500833 - FRA-23D-3.17 (Third St over Nationwide Blvd)SFN 2500663 - FRA-23-12.11 (Fourth St over NS RR, Conv Center Conn, Third St ramp)SFN 2506149 - FRA-23-12.12 (Ramp to 670 EB over NS RR) 86661~|~2~|~7~|~07/S>2/Cols~|~100% Columbus funded items: curb ramps and pvmt repair 86661~|~2~|~3~|~03/NHS~|~Columbus urban paving of FRA-23 12.11 to 15.31 (Fourth St from EB ramp to IR 670 to Hudson St and Hudson St from Fourth St to Indianola Ave); FRA-23D 0.00 to 3.26 (Summit/Third St from Hudson St to Chestnut St) 86661~|~2~|~4~|~04/BRO~|~Bridge work on on structure at 90/10 - SFN 2500914 - FRA-23D-2.70 (Third St over I-670) 86661~|~1~|~2~|~02/S>2/Cols~|~100% Columbus funded items: Paving Rich St, curb ramps, pvmt repair and signal work 86661~|~1~|~1~|~01/NHS~|~Columbus urban paving of FRA-23 10.83 to 12.11 (Fourth from Fulton to EB ramp to IR 670) and FRA-23D 3.26 to 4.25 (Third from Chestnut to Fulton) 86661~|~2~|~6~|~06/SAF~|~Safety funding for road diet items on Summit and Fourth St from Hudson to I-670: signal items, signing, possibly striping if outside urban paving striping 86661~|~1~|~8~|~08/S>2~|~District Preservation funding (100% State) for signal work at Mound/Third intersection by change order 118665~|~1~|~1~|~01/SAF~|~Intersection improvement project. 119164~|~1~|~1~|~01/STR~|~Chip seal project. 96439~|~1~|~1~|~01/NHS~|~Remove center raised median and replace with single sloped concrete barrier on MOT US 35 10.32 to 14.41 114011~|~1~|~1~|~01/SAF~|~JAC CR VAR PM FY26. 83723~|~1~|~3~|~03/IMS~|~ This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of the work originally to be completed under PID 76257. Project adds a lane to I-75 from the Monmouth overpass to just south of Clifton Rd.and reconfigures the I-74/75 interchange. Multi-Lane portion of project 83723~|~1~|~1~|~01/IMS~|~ This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of the work originally to be completed under PID 76257. Project adds a lane to I-75 from the Monmouth overpass to just south of Clifton Rd. and reconfigures the I-74/75 interchange. Major-New portion of the work 83723~|~1~|~2~|~02/IMS~|~ This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of the work originally to be completed under PID 76257. Project adds a lane to I-75 from the Monmouth overpass to just south of Clifton Rd.and reconfigures the I-74/75 interchange. Bridge portion of the project. 122989~|~1~|~1~|~01/MPO~|~Compton Rd Sidewalk 117402~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items 112821~|~1~|~1~|~01/NFA~|~Plan split for the eligible construction and construction inspection costs of replacing SFN 4734114 93189~|~1~|~1~|~01/STR~|~Remove and replace existing overlays (Latex and Microsilica) with new latex modified concrete deck overlay system, and and necessary patching on: SFN 0602736 SUG 197 0510 over ST Marys River 93189~|~1~|~2~|~02/NFA~|~Remove and replace existing overlays (Latex and Microsilica) with new latex modified concrete deck overlay system, and and necessary patching on: SFN 0602523 AUG 116 0822 over St Marys River 97600~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation Bridge Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Emergency repair of the approach, expansion joint and backwall on Gue-IR 70-09.94L bridge (SFN #3001350) over IR 77. 97888~|~1~|~1~|~01/MPO~|~Construct multi-pupose trail utilizing MPO funds. 101522~|~1~|~1~|~01/STR~|~Prevailing wage tree cutting contract. 121869~|~1~|~1~|~01/SAE/HUR~|~Installation of guardrail on various Huron County roads 104634~|~1~|~1~|~01/MPO~|~Resurfacing West Market Street from SR 5/82 interchange to Lovers Lane in Warren Township. 113824~|~1~|~1~|~01/IMS~|~Split for work to replace the culvert 87044~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY 2015. 100% State. 92545~|~1~|~2~|~02/STR~|~Resurface the existing roadway. along with other roadway related items within village of N. Lewisburg of S.R. 245 CHP 245 20.05 to 21.61, WCL of N Lewisburg to ECL of N Lewisburg. 92545~|~1~|~1~|~01/STR~|~Repair of curb and gutter, sidewalk, tree lawn and other roadway related items on SHE SR 274 from SLM 15.24 to 16.58 and on CHP SR 245 from SLM 20.05 to 21.61. 115859~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 39 2.025, SFN 5331366. 116923~|~1~|~1~|~01/BRO~|~Bridge Deck Replacement 98052~|~1~|~3~|~03/IMS/CNN~|~test 98052~|~1~|~4~|~04/ENH~|~test 98052~|~1~|~2~|~02/ENH~|~test 98052~|~1~|~6~|~06/IMS~|~test 98052~|~1~|~5~|~05/ENH/CNN~|~Test only 98052~|~1~|~7~|~07/IMS~|~test 98052~|~1~|~1~|~01/IMS~|~test 98867~|~1~|~1~|~01/MPO~|~Lighting and Sidewalk improvements on multiple city streets. 102531~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation - 4PF7 (80%)/4PS7 (20%) - No CAP - Replacement of two box culverts located at MUS-60-0.30 and MUS-60-0.90. 105349~|~1~|~1~|~01/BRO~|~Construction of the new Western Hills Viaduct including constructing tower piers, approach bridge substructure, construction of large span and approach span superstructures and decks and remaining approach roadway. 117640~|~1~|~1~|~01/ENH~|~Streetscape improvement project including addition of dedicated bicycle lane utilizing Federal TAP (4B37) funds at 95%. 116660~|~1~|~1~|~01/NHS~|~WAY-30-11.81 to 19.47 WB Direction Only 124923~|~1~|~1~|~01/STR~|~Culvert replacement project. 100464~|~1~|~1~|~01/NHS~|~Installation of pedestrian amenities, including construction of bumpouts; repair of sidewalks, curbs, driveway approaches and curb ramps; and installation of amenities such as trash receptacles and benches. 122486~|~1~|~1~|~01/SAF~|~Install roundabout. 110363~|~1~|~1~|~01/STR~|~HIG 134 11.24-13.99 & 14.06-18.78 110363~|~1~|~2~|~02/STR~|~Bridge PM.100% state due to bridge length. 114957~|~1~|~1~|~01/S>2~|~Replace Structure 118005~|~1~|~1~|~01/SAF~|~Convert signalized intersection into single-lane roundabout at HUR-4-8.02/SR 113 (Safety Funds) 118005~|~1~|~2~|~02/NFA~|~Waterline work paid 100% by Northern Ohio Rural Water. 118005~|~1~|~3~|~03/NFA~|~Waterline work for Erie County. 120563~|~1~|~1~|~01/STR~|~Pier encasement on COS-36-13.89 104755~|~1~|~1~|~01/IMS~|~District Culvert Funding 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Culvert Repairs on: 1) GUE IR 70 21.92; 2) GUE IR 70 23.42; 3) GUE IR 77 3.81; 92484~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project on GAL CR 68 (Peniel Rd). Begin at the community of Peniel (CR 76) and end at CR 134 (Cadmus Rd). 100% Federal (Forest Hwy Funds). 92484~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project on GAL CR 68 (Peniel Rd). Begin at the community of Peniel (CR 76) and end at CR 134 (Cadmus Rd). 100% Local. 85627~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 113095~|~1~|~1~|~01/STR~|~Resurfacing of STA SR 44 from 19.39 to 23.21. 86462~|~1~|~1~|~01/NHS~|~Consolidate and manage access points to establish relocated SR 32 a controlled access arterial roadway west of IR 275, including coordination for accommodation of multi-modal components; Oasis rail corridor, bikeway corridor, a new interchange at US 50/Red Bank/SR 32 in Fairfax, a multi-modal clear span crossing of the Little Miami River and associated multi modal transit hubs (at US 50 and at Newtown Road). 108952~|~1~|~1~|~01/NFP~|~Plan split for Paving for Hayes site 117913~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-74-A 121436~|~1~|~1~|~01/NFP~|~Pavement repair 119002~|~1~|~1~|~01/BRF/TRCE~|~Superstructure replacement. 118097~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds to resurface 121173~|~1~|~1~|~01/NFP~|~crack sealing plan split. 111654~|~1~|~1~|~01/S50/NEWA~|~City of Newark Local Program Municipal Bridge Funding - 4R87 (80% Federal) / 4BG7 (15% TRC) /4BG7 (5% Local) - See CAP Comments - Funding to replace SFN 4560418 (Moull Street - CR 813) and SFN 4560426 (Jefferson Street - MR 491) over Log Pond Run 102989~|~1~|~1~|~01/STR~|~Bridge replacement project on MEG 124 59.70, SFN 5301920. Rural other federal aid funded 80 federal/20 state. 118794~|~1~|~1~|~01/BRO~|~Work for Bridge Rehabilitation. 115032~|~1~|~1~|~01/S<2~|~RIC SR 0314 02.75-Culvert Replacement. 106026~|~1~|~1~|~01/STR~|~Replace culvert: BUT-126-0885. 106026~|~1~|~2~|~02/NHS~|~Pave culvert: HAM-52-3729 106026~|~1~|~3~|~03/IMS~|~Pave culvert: HAM-74-1121. Cure in place liner for small culvert: HAM-74-1396. 106026~|~1~|~4~|~04/S>2~|~Pave culvert: BUT-747-0530. 112482~|~1~|~1~|~01/S>2~|~AC Overlay without repairs 112482~|~1~|~2~|~02/STR~|~AC Overlay without repairs 103504~|~1~|~1~|~01/ERD~|~Horizontal curve correction to mitigate crashes. 88837~|~1~|~1~|~01/NHS~|~This split is for resurfacing on the NHS system. The bond funds SAC 7BPB should be used before the regular District Preservation Program budget funds federal SAC 4PF7and state SAC 4PS7. All three SAC are District funds. The bond funds SAC 7BPB are capped. 114156~|~1~|~1~|~01/STR~|~Culvert replacement project. 101478~|~1~|~1~|~01/BRO~|~This split is for all work associated with bridges PAU-114-12.42 and PAU-114-16.80; SAC's 4PF7 and 4PS7. 22714~|~1~|~2~|~02/BRO~|~The funding event is for relocating a water pipeline that is necessary because of the project which includes the removal of a bridge (BEL-147-0961, SFN 0703427) 22714~|~1~|~1~|~01/BRO~|~Remove existing bridge BEL-147-0961 (SFN 0703427) and replace with embankment. 123733~|~1~|~1~|~01/IMS~|~Plan split for Interstate 102552~|~1~|~1~|~01/NHS~|~District-wide culvert replacement program. Locations TBD. 117401~|~1~|~1~|~01/MPO/NILE~|~Resurfacing. 117935~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-90-A 218-241 93125~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrial Upgrade on: 1) Mus-US 22-00.31 to 01.16; 2) Mus-SR 93-00.25 to 03.45; 93125~|~1~|~2~|~02/S<2~|~"02/S<2/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail Upgrade on: 1) Mus-US 40-09.40 to 09.59; 93125~|~1~|~3~|~03/NHS~|~"03/NHS/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail Upgrade on: 1) Mus-US 22-01.16 to 07.49; 2) Mus-US 40-09.59 to 10.23; 3) Mus-SR 93-00.01 to 00.25; 4) Mus-SR 93-03.45 to 04.40; 5) Per-SR 93-26.01 to 26.82; 115157~|~1~|~1~|~01/ENH~|~Construction of a 0.21 mile long section of recreational trail. Work includes installing a 12 foot wide asphalt path, widened sidewalk along Webster St., a small retaining all, benches, trash cans, and pavement striping. 103810~|~1~|~1~|~01/MPO~|~Rehab SFN 2536064 96725~|~1~|~1~|~01/NFA~|~Stark County Garage, addition to back of garage to gain vehicle storage space or building 6 Bay Cold Storage along back fence. 103438~|~1~|~1~|~01/STR~|~AC overlay on MRW-42 and MRW-61 FGPO on MRW-314 103438~|~1~|~2~|~02/STR~|~Items to be paid 100% by Mt Gilead 90246~|~1~|~1~|~01/BRO~|~Replace FRA-40/Main St bridge 2502828 FRA US40 21.35 Intersect: Big Walnut Creek 91720~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 553 0.00-2.33. Rural other federal aid funded 80 federal/20 state. 119955~|~1~|~1~|~01/STR~|~added plan split. 84581~|~1~|~1~|~01/NHS~|~Bridge Maintenance/Repair 95741~|~1~|~1~|~01/STR~|~STP rural pavements - FDR funds then District Alloc funds. 119997~|~1~|~1~|~01/S>2~|~Big Walnut Trail from Refugee Road to East Main St 100869~|~1~|~1~|~01/NHS~|~SCI 52 0.00-8.67 100869~|~1~|~2~|~02/NHS~|~SCI 52 0.84 (SFN 7300425)SCI 52 1.28 (SFN 7300492)SCI 52 2.80 (SFN 7300557)SCI 52 6.73 (SFN 7300581) 96794~|~1~|~1~|~01/STR~|~General System Resurfacing including Pavement Repairs and Pavement Markings on HOL-62. 93945~|~1~|~1~|~01/NFA~|~District wide pavement markings. D09 Auxiliary Markings (A) 100% State 110452~|~1~|~1~|~01/SAE~|~Upgrade traffic signals at the intersections of CLE-125 & Amelia-Olive Branch Road, HAM-27 & Round Top Road, HAM-27 & Virginia Avenue, and BUT-4 & Grand Boulevard. 106672~|~1~|~1~|~01/MPO/ERI~|~Active Transportation program 97029~|~1~|~1~|~01/NFP~|~Split 1 88551~|~1~|~1~|~01/S<2~|~Milling of existing roadway and resurface with Asphalt Concrete on MER US 127 from the junction of US 127 (SLM 12.45 to Celina's East Corporation limit (SLM 13.37) . Urban Paving Program 120349~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties. 101288~|~1~|~1~|~01/STR~|~WIL-34 from SLM 0.00 to 6.35 94295~|~1~|~1~|~01/NFP~|~Construct a mixing shed at the GAL M&R Garage. Non federal aid project funded 100% state (LBP7). 100171~|~1~|~1~|~01/S>2~|~Widen roadway from 2 lanes to 2 thru lanes and center turn lane, add sidewalk. 100171~|~1~|~2~|~02/S>2~|~100% local items. 79842~|~1~|~1~|~01/MPO~|~Pavement widening 115987~|~1~|~1~|~01/NHS~|~Perform backwall and approach slab patching on six structure on US 23 119255~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing of UNI-347. 109935~|~1~|~1~|~01/NFP~|~Lighting improvements at ATB IR90 TIC/Rest Area. 109905~|~1~|~1~|~01/STR~|~Resurfacing SR 149 110419~|~1~|~1~|~01/S>2~|~FY23 Urban Paving on SR 63 and US 42 in the City of Lebanon. 110419~|~1~|~2~|~02/S>2/LEB~|~This plan split is for items that are not eligible for the urban paving program on SR 63 and US 42. 102572~|~1~|~1~|~01/IMS~|~FRA-40-6.27 (2512270) damage repair 88799~|~1~|~1~|~01/NHS~|~Seal bridge deck with SRS and painting existing structural steel beams on SFN 0600296 AUG US 33 1284, SFN 0600202 AUG US 33 0269 R, SFN 0601144 AUG US 66 1273, SFN 0600199 AUG US 33 0212 L, and SFN 0600288 AUG US 33 0929. 88799~|~1~|~2~|~02/IMS~|~Seal bridge deck with SRS, and painting existing structural steel beams on SFN 0602310 AUG UR 75 0876. 95320~|~1~|~1~|~01/CMQ~|~Extension of Marietta River Trail Bike/Ped path, approximately 0.83 miles beginning at Jefferson Street and ending at Cogswell Lane. A new bridge crossing will be provided over Duck Creek downstream of the existing Pike Street bridge. Funded 80 federal/20 local. 120037~|~1~|~1~|~01/S5K~|~Intersection Improvement 87217~|~1~|~1~|~01/BRO~|~4402979 LAW SR217 5.72 Intersect: Symmes Creek 100% state 01/BRO/BR/State 83937~|~1~|~1~|~01/NFA~|~3630773 HIG CR11 17.43 Intersect: Bull Creek CEAO 80 Fed/20 Local Match Highland County 01/NFA/BR/High 103720~|~1~|~1~|~01/S>2~|~Intersection improvement at MAH SR 46 and Mahoning Avenue. Includes adding exclusive right turn lane on the eastbound approach of Mahoning Avenue; add northbound lane to create two through lanes in addition to an exclusive left and right; reconstruct the signal and add back plates; reduce the speed limit on Mahoning Avenue from 45 MPH to 35 MPH west of SR 46. 94043~|~1~|~1~|~01/IMS~|~Annual district mowing contract 116246~|~1~|~1~|~01/IMS~|~Conduit replacement at multiple locations. 108557~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH CR 20 8.89. DSR ATH-009. Rural other federal aid funded 80 federal/20 local ER funds. 98585~|~1~|~1~|~01/CMQ/PCE~|~Widening of County Route 18 (Tallmadge Road) and Mogadore Road in Portage County, Ohio. 98585~|~1~|~2~|~02/CMQ~|~Widening of Eastbound and Westbound ramps along IR76 at CR-18 interchange in Portage County, Ohio. 98585~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 84570~|~1~|~1~|~01/S>2~|~Plan Split for SUM SR 91 from 1.42 to 1.81 104084~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project. Concrete joint repair. MEG 33 24.31-27.69. NHS route funded 80 federal/20 state. 109638~|~1~|~1~|~01/IMS~|~Resurfacing BEL-470 102795~|~1~|~1~|~01/STR~|~Applying chip seal to various STP Rural routes 102795~|~1~|~2~|~02/NFA~|~programmed by Matt Rotar per the request of Heidi Mertler of CO to account for routes not on federal aide system 97206~|~1~|~1~|~01/SAF~|~Upgrade signals at the following locations: GRE-35-5.036 @ Orchard; GRE-35-6.238 @ Valley; HAM-50-1.05 @ Lawrenceburg 104673~|~1~|~1~|~01/IMS~|~Seal FRA-270/1856L/R bridge decks and parapet repairs. 104673~|~1~|~2~|~02/IMS~|~Seal FRA-270-5353 L/R bridge decks 99365~|~1~|~1~|~01/NFP~|~"01/NFP/CV/ " - ODNR Parks Project - 4BF7 (100% State) - No CAP - Repair of 6 drain pipes at various locations within Salt Fork State Park. 107762~|~1~|~1~|~01/SAE~|~100% HSIP funds from the CEAO. Guardrail is eligible for 100% federal funds. Funds needed over the CEAO cap will be provided by Allen County. 103099~|~1~|~1~|~01/STR~|~Plan Split created for FY22 culvert work 103099~|~1~|~2~|~02/IMS~|~Plan split created for culvert work at FRA-270-7.40 119765~|~1~|~1~|~01/SAF~|~Various pedestrian safety improvements (pavement markings, curb ramp, RRFBs, etc.) throughout the City of Monroe. 88863~|~1~|~2~|~02/NHS~|~Crack sealing at several locations on: MAR 23 14.93-19.97 PIC 23 0.00-5.21 88863~|~1~|~1~|~01/STR~|~Crack sealing at various locations on:DEL 42 0.00-3.25FAY-41-0.00-10.37FAY 41 15.48-29.15MAD 40 6.66-7.90MRW 61-3.27-8.00MRW 61 14.13-22.86 88863~|~1~|~3~|~03/S>2~|~Cracksealing DEL 42 3.25 to 4.27 88863~|~1~|~4~|~04/S<2~|~Crack sealing FAY 41 10.37 to 10.62 and FAY 41 14.38 to 15.48 122051~|~1~|~1~|~01/ENH~|~Reuse of historical bridge on the Pickaway Trail over Yellowbud Creek and Lick Run. 118672~|~1~|~1~|~01/MPO/HCEO~|~Improvements to the intersections of Fields Ertel Road with Conrey and McCauly. 106651~|~1~|~1~|~01/S<2~|~SCI 73 23.01 117094~|~1~|~1~|~01/SAF~|~Intersection improvement 101320~|~1~|~1~|~01/NHS~|~CO CO Contr 01 plan split 1 created for the following NHS routes: FRA-33-0.00-0.32 UNI-33-24.55-25.11 101320~|~2~|~2~|~02/STR~|~CO CO Contr 02 plan split 2 created for the following STP Rural routes: FRA-161-0.00-0.83 MAD-161-0.00-3.62 UNI-38-0.30-7.61 UNI-161-12.19-13.49 UNI-245-0.00-7.50 UNI-347-8.09-15.53 UNI-42-4.84-9.89 101320~|~1~|~3~|~03/NHS~|~CO CO Engr 01 plan split 1 created for the following NHS routes: FRA-33-0.00-0.32 UNI-33-24.55-25.11 101320~|~2~|~4~|~04/STR~|~CO CO Engr 02 plan split 2 created for the following STP Rural routes: FRA-161-0.00-0.83 MAD-161-0.00-3.62 UNI-38-0.30-7.61 UNI-161-12.19-13.49 UNI-245-0.00-7.50 UNI-347-8.09-15.23 UNI-42-4.84-9.89 112190~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties. 92491~|~1~|~1~|~01/IMS~|~Auxiliary Pavement Markings in POR, STA and SUM Counties 96140~|~1~|~1~|~01/NFA~|~Construct a new equipment storage building at a new St. Marys Yard Facility. 106729~|~1~|~1~|~01/MPO~|~Construct new sidewalks at designated locations along Cook Road and Fitch Road in Olmsted Township that is eligible for federal-aid. 84298~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 106307~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4. 98111~|~1~|~1~|~01/NHS~|~Pavement resurfacing from SLM 24.26 to 26.12 and a EB auxiliary lane in the median from the IR 270 SB exit ramp to the bridges over Big Walnut Creek 98111~|~1~|~3~|~03/SAF~|~Safety funds for auxiliary lane addition in both directions from the Hamilton Rd ramps and the IR 270 ramps 98111~|~2~|~4~|~04/NHS~|~Repair damage to Gender Rd structure over US 33 98111~|~1~|~2~|~02/NHS~|~Overlay and widen bridges for auxiliary lanes: FRA-33-2503 L/R FRA-33-2509 L/R 98111~|~1~|~5~|~05/SAF~|~Additional cost of clear panel noise wall to be paid by property owner. 87401~|~1~|~1~|~01/IMS~|~Provide loop ramp for traffic going northbound on I71 to go north on Mason Montgomery Road. Cost inlcudes widening of bridge HAM-71-1989R and WAR-71-0009R, but not rehabilitation (overlay) costs. 87401~|~2~|~2~|~02/IMS~|~Rehabilitate bridges HAM-71-1989L/R and WAR-71-0009 L/R installing new rigid overlays and work related to the rehabilitation of these structures for SFN's 3107752, 3107760, 8301727 & 8301697. Widening cost of these structures is NOT included in this plan split. 96898~|~1~|~1~|~01/IMS~|~Noisewall maintenance 96898~|~1~|~2~|~02/IMS~|~Split for extra work change order funded by DA - 100% state funds (4PS7) 123483~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. 123483~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. 116767~|~1~|~1~|~01/NHS~|~Resurfacing. 108264~|~1~|~1~|~01/STR~|~Slide repair ADA-348-11.20 96920~|~1~|~1~|~01/SAE~|~Pavement Marking 92998~|~1~|~2~|~02/NFP~|~100% Local funds - Over funding cap 92998~|~1~|~1~|~01/NFP~|~Intersection Improvement 87291~|~1~|~1~|~01/S>2~|~Microsurfacing TRU US 62 from 0.00 to 2.55. 104152~|~1~|~1~|~01/NHS~|~Resurfacing on NHS route. 112466~|~1~|~2~|~02/NFP~|~Plan split for non-eligible funded work at 100% Local cost. 112466~|~1~|~1~|~01/MPO~|~Plan split for MPO funded eligible work. 97304~|~1~|~1~|~01/SAE~|~Installation of approximately 15 miles of thermoplastic pavement markings on various County roads in Clermont County. 84573~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ATH 50 0.00-1.74 and VIN 50 16.34-17.75, 19.76-30.16. Rural other federal aid funded 80 federal/20 state. 100318~|~1~|~1~|~01/S<2~|~Fine graded polymer AC Overlay for ATB SR 84 from 2.14 to 2.61 and 3.85 to 7.40 and 10.45 to 12.02. 100318~|~1~|~2~|~02/STR~|~Fine graded polymer AC Overlay for ATB SR 84 from 0.00 to 2.14 and 7.40 to 10.45. 97794~|~1~|~1~|~01/IMS~|~SFN 0602256 - 0602280 AUG-75-0754 L/R - Provide new bridge decks (class S), parapets and expansion joints, patch abutments and backwalls, epoxy inject pier cracks, and seal structure concrete. 96221~|~1~|~1~|~01/NHS~|~Extend southbound left turn lane on US127 to John Gray Road. 113036~|~1~|~1~|~01/S<2~|~Small City funded Plan split up to $2,000,000 CAP - Local funds after 113036~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope items, including water line replacements 101705~|~1~|~1~|~01/NFA~|~Replace structurally-deficient bridge. 101277~|~1~|~1~|~01/STR~|~Resurfacing for Rural Section - San 53 0.00 to 2.52; 3.05 to 4.55 101277~|~1~|~2~|~02/S<2~|~For the urban section - San 53 2.52-3.05; 4.55 to 5.95 109249~|~1~|~1~|~01/NFP~|~Wearing surface replacement on 4 structures 113680~|~1~|~1~|~01/STR~|~Chip Seal CRA SR 98 19.20 to 23.74Chip Seal RIC SR 98 00.00 to 03.44 113680~|~1~|~2~|~02/S<2~|~Chip Seal RIC 98 3.44 - 4.71. 114125~|~1~|~1~|~01/NFA~|~Culvert replacement at HOL-515-0.18 81110~|~1~|~1~|~01/STR~|~Rural other federal aid. Paving invert of culvert pipe. VIN 50 0.49, SFN 8200033. 92505~|~1~|~1~|~01/NFA~|~Bikeway construction 113448~|~1~|~1~|~01/S>2~|~Implement a road diet to reduce the through lanes from four lanes to two lanes with a double left turn lane and bike lanes. New pavement and pavement markings will be installed with improved crosswalk markings in the City of Dayton. 123422~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 93051~|~1~|~1~|~01/SAE~|~This Plan Split is for safety work eligible for 100% federal funding. The federal funds are from the City of Findlay budget. 102153~|~1~|~1~|~01/NFA~|~D9 4-lane mowing. 118484~|~1~|~1~|~01/MPO/AND~|~Widening of Clough Pike to provide EB and WB left turn lanes at Newtown Road. Addition of sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. 93581~|~1~|~1~|~01/S<2~|~"01/S<2/OT/CAMB" - City of Cambridge project for the installation and replacement of sidewalks on various City Streets 120271~|~1~|~1~|~01/ENH~|~Construction of pedestrian facilities through the SRTS program utilizing 100% SRTS Federal funds (inc. TRC) in Construction phase up to CAP. 107769~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funded using SAC 4PS7. 123772~|~1~|~1~|~01/BRO~|~Bridge Replacement 111195~|~1~|~1~|~01/SAF~|~Replace guardrail end treatments at various locations 123414~|~1~|~1~|~01/STR~|~Resurfacing SR 83 107899~|~1~|~1~|~01/STR~|~Rural Plan Split 107899~|~1~|~2~|~02/S<2~|~Urban Area (STP <200000) Plan Split 107899~|~1~|~3~|~03/NHS~|~NHS Plan Split 107899~|~1~|~4~|~04/S>2~|~Urban Area (STP>200000) Plan Split 83585~|~1~|~1~|~01/S<2~|~Replace deficient bridge with minimal approach work on SFN 7500696 SHE /SR 47 1643 in Sidney on State Route 47 at 0.72 mile East of the Junction of State Route 29 DA over Tawawa Creek. 122896~|~1~|~1~|~01/ENH/KINS~|~Installing new sidewalks. 76938~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - Garvee Bonds (100% Federal) - $34,400,000.00 CAP - Construction of new interchange bridge on Fai-US 33-05.00 to 05.35; work on other structures 76938~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - Garvee Bond (100% Federal) - $34,400,000.00 CAP - Construction of new interchange pavement on: 1) Fai-US 33-05.00 to 05.35; 2) Fai-CR 34-03.96 to 04.13; 3) Fai-TR 206-00.00 to 00.10; 76938~|~1~|~3~|~03/NHS~|~"03/NHS/OT/ " - Garvee Bond (100% Federal) - $34,400,000.00 CAP - Installation of Signals, traffic control, lighting, sewewr and water in support for Construction of new interchange pavement on: 1) Fai-US 33-05.00 to 05.35; 2) Fai-CR 34-03.96 to 04.13; 3) Fai-TR 206-00.00 to 00.10; 100612~|~1~|~1~|~01/S<2~|~LOG SR 47 SLM 13.50 to 14.10 Mill and fill 1.75" with asphalt concrete 100612~|~1~|~2~|~02/NHS~|~LOG USR68D SLM 0.10 to 0.50 Mill and fill 1.75" with asphalt concrete. 104716~|~1~|~1~|~01/IMS~|~Gap project to perform joint repairs on IR. 122220~|~1~|~1~|~01/NHS~|~Conduit outlet replacement. 122220~|~1~|~2~|~02/STR~|~Conduit replacement. 80277~|~1~|~1~|~01/NHS~|~Noisebarriers for the south side of US 35 between Nicolas Street and Jordan Avenue. Exact SLM to follow. 80277~|~1~|~2~|~02/NHS~|~Reconstruction (retaining walls, guardrail, signing, pavement markings, and incidentals) of Jordan Avenue in Dayton on USR 35 from SLM 18.18 to 19.10 110671~|~1~|~1~|~01/STR~|~All costs under this split. Uses district capital allocations. 102455~|~1~|~1~|~01/IMS~|~Concrete Pavement Repairs on IR 70 from SLM 7.62 to 12.62 109612~|~1~|~1~|~01/NFA~|~Bridge repairs to the linked structure. 115909~|~1~|~1~|~01/NFP~|~Diamond grinding on the IR 70 to SR 256 Ramp 93766~|~1~|~1~|~01/NHS~|~Reface abutments with anodes and upper launch to carch deck spalls at abutment and patch wingwalls with anodes on SFN 4600630 LOG 33 1521 L. TWP RD 217. 92094~|~1~|~1~|~01/BRO~|~ Field pave existing twin pipe arches from the right of way line to the outlet of the pipes. SFN 5704111 MOT SR 49 5.46 over Tributary of Dry Run. 92094~|~1~|~2~|~02/NHS~|~Field pave invert of culvert with concrete on SFN 5704138 MOT SR 49 5.73. 92785~|~1~|~1~|~01/NFA~|~Rehabilitate and resurface various routes and parking lots within Miami Whitewater Forest. Improvements include pavement planing, pavement repairs, pavement widening asphalt concrete surface course, pavement markings, installation of parking blocks, and installation of guardrail. 101992~|~1~|~1~|~01/NFP~|~Epoxy pavement markings on various routes throughout District 4. 92147~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for 1 year mowing contract 85530~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 116196~|~1~|~2~|~02/BRO~|~All bridge replacement work included in this split. 116196~|~1~|~1~|~01/S50~|~All road widening and drainage work included in this split. Work funded with 80% federal funds from the CEAO with the 20% match provided by Allen County. All funds needed after the CEAO cap is reached will be provided by Allen County. 117487~|~1~|~1~|~01/MPO~|~Plan split for path construction. 115365~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - replacement of structure COS SR 93 19.21 (SFN 1602160). 101838~|~1~|~1~|~01/STR~|~Repair various bridges on the district by refacing abutments, fixing scour issures & patching piers. 101838~|~1~|~2~|~02/NHS~|~Repair various bridges in the district by refacing abutments, fixing scour issues & patching piers. 101838~|~1~|~3~|~03/IMS~|~Reapir various bridges in the district by refacing abutments, fixing scour issures & patching piersThis split is for Interstate bridges. 110895~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix 104713~|~1~|~1~|~01/NHS~|~Resurfacing of SR 315 and reconstructing off ramp 104713~|~1~|~2~|~02/S>2~|~Reconstruction of the intersection of Olentangy River Rd and Goodale Blvd and resurfacing on Olentangy River Rd. 104168~|~1~|~1~|~01/ENH~|~Street lighting, traffic signal, pedestrian buttons, benches, trash receptacles 108078~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridge. 117200~|~1~|~1~|~01/S5K~|~Installation of sidewalks, curb ramps & pedestrian signals 117200~|~1~|~2~|~02/S5K~|~Traffic signal replacements on Indiana at Kishler and Executive 94258~|~1~|~1~|~01/STR~|~JAC 93 3.64 - 8.64 77038~|~1~|~1~|~01/IMS~|~Resurfacing 77038~|~1~|~2~|~02/IMS~|~ONYX shoulder fog seal treatment (100% State) 116837~|~1~|~1~|~01/S>2~|~Split for bridge work 122207~|~1~|~1~|~01/SAF~|~SRTS funding for SUP 122207~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded feature that are not necessary for SUP 111574~|~1~|~1~|~01/NFA~|~Split for bridge replacement work. 111574~|~1~|~2~|~02/NFP~|~Plan split for non-eligible items at 100% local cost. 108357~|~1~|~1~|~01/NHS~|~Bridge painting project. MOE 7 19.51 (SFN 5600545). NHS route funded 80 federal/20 state. 108357~|~1~|~2~|~02/STR~|~Bridge painting project. WAS 676 5.18 (SFN 8404909). Rural other federal aid funded 80 federal/20 state. 108357~|~1~|~3~|~03/NFA~|~Bridge painting project. WAS 260 9.69 (SFN 8403902). Not on the federal aid system funded 100% state. 102177~|~1~|~1~|~01/NFP~|~Addition to the D10 Traffic Building to house the test lab. Non federal aid project funded 100% state. 93021~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 33-00.00 to 05.10 93021~|~2~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - deck sealing on four structures - SFNs 2300478, 2300486, 2300540, and 2300443. Work will also include joint replacements for pressure relief joints and approach slab joints on SFN 2300443. 108549~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH CR 20 2.82. DSR ATH-010. Rural other federal aid funded 80 federal/20 local ER funds. 108549~|~1~|~2~|~02/S<2~|~OH18-01 ER Event. Landslide repair project. ATH CR 42 4.48. DSR ATH-011. Rural other federal aid funded 80 federal/20 local ER funds. 90982~|~1~|~1~|~01/SAE~|~Cross walk ugprades at 9 locationsBikepath from Thomas Lane to Middle SchoolTwo radar speed display signs01/SAE/OT/ 90982~|~1~|~2~|~02/SAF/Lon~|~100% City of London funds to replace deteriorated sidewalk 96839~|~1~|~1~|~01/NFP~|~Expo Center 88371~|~1~|~1~|~01/BRO~|~Replace a deficient structure over Interstate 75 with minimal approach work on Statler Road SFN 5503094 MIA 75 1569. 100877~|~1~|~1~|~01/STR~|~Chip seal in the following counties, routes and sections: DEL-257-14.26-22.62 MAR-203-1.19-3.24 MAR-257-0.00-0.65 UNI-37-2.20-5.49 UNI-38-0.00-0.11 UNI-38-0.30-7.61 UNI-47-0.00-7.57 94136~|~1~|~2~|~02/NHS~|~Resurfacing. 94136~|~1~|~3~|~03/STR~|~Resurfacing. 94136~|~1~|~1~|~01/IMS~|~Resurfacing. 102555~|~1~|~1~|~01/NFA~|~District Lands and Building Maintenance Funds - LBM7 (100% State) - No CAP - Reconstruction of TR 1708 to a paved roadway, providing access to the new Security Gate. 98529~|~1~|~3~|~03/S>2~|~FY2018 Urban Paving Project in the City ofWilmington. This plan split is for SR 134 where the pay items are split 80% State and 20% City. 98529~|~1~|~1~|~01/NHS~|~FY2018 Urban Paving Project in the City ofWilmington. This plan split is for US 68 where the pay items are split 80% State and 20% City. 98529~|~1~|~4~|~04/S>2~|~FY2018 Urban Paving Project in the City of Wilmington. This plan split is for SR 134 where the pay items are 100% City. 98529~|~1~|~2~|~02/NHS/WILM~|~FY2018 Urban Paving Project in the City of Wilmington. This plan split is for US 68where the pay items are 100% City. 107875~|~1~|~1~|~01/STR~|~Resurfacing work on SR 501 in Allen County from the county line to the Lima Urbanized Area boundary at Breese Road at SLM 2.01. District preservation funds. 107875~|~1~|~2~|~02/S<2~|~Resurfacing work on SR 501 in Allen County from the Urbanized Area boundary at Breese Road at SLM 2.01 to the end of the project. District preservation funds. 105735~|~1~|~2~|~02/NFA~|~Work on a structure that meets the state but not federal definition of a bridge which is located on SR 701 in Hardin County. The road is a Rural Minor Collector and not eligible for federal funds. 100% state funds from the District Preservation Program SAC 4PS7. 105735~|~1~|~1~|~01/STR~|~District preservation funds using 80% federal SAC 4PF7 and 20% state SAC 4PS7. 122446~|~1~|~1~|~01/STR~|~Encase several bridge piers throughout District Six. 122446~|~1~|~2~|~02/S5K~|~Work on MAR-95-17.443 within the Marion Urban Area 122446~|~1~|~3~|~03/NFA~|~Work on MAR-100-1.442 (not on the federal aid system) 105390~|~1~|~1~|~01/NHS~|~Smooth seal on NHS route: DAR SR 49 SLM 0.00 to 6.16 105390~|~1~|~2~|~02/STR~|~Smooth seal on rural route: DAR SR 118 SLM 8.58 to 12.95 102097~|~1~|~1~|~01/SAF~|~Add signal and left turn lanes on SR3 at Galena Road in Delaware County 111240~|~1~|~1~|~01/MPO~|~Sidewalk 99580~|~1~|~1~|~01/SAF~|~Intersection improvement of CR 32 and CR 53 (Middle Ridge/West Ridge) 98262~|~1~|~2~|~02/NHS~|~Urban System Paving in City of East Liverpool of SR 7. Eligible items include curb ramps and aux. pavement markings. 98262~|~1~|~1~|~01/NHS~|~Urban System Resurfacing COL-7 from East Liverpool SCL to COL-30 ramp at SLM 6.09, including pavement planing, asphalt overlay and pavement marking. 98262~|~1~|~3~|~03/NFA~|~Extra work requested by ODOT at final inspection, including revisions to curb ramps. 96985~|~1~|~1~|~01/IMS~|~Bridges using 100% state money. 124498~|~1~|~1~|~01/NFP~|~Created for J&C TID involvement 100648~|~1~|~1~|~01/STR~|~plan split for pavement work in the rural section:PRE-35 SLM 2.62-9.14 100648~|~1~|~2~|~02/S5K~|~plan split for pavement work on the small urban section:PRE-35: SLM 9.14-10.02 100648~|~1~|~4~|~04/STR~|~plan split for work on the PRE-35-0817 structure 100648~|~1~|~3~|~03/STR~|~Upgrade railing and surface course only on 0860 bridge. 99014~|~1~|~1~|~01/BRO~|~Bridge Funds 99014~|~1~|~2~|~02/BRO~|~Jennings Randolph 105605~|~1~|~1~|~01/STR~|~Rural Plan Split: MAD-56-19.64-24.35 MAD-142-11.44-13.34 PIC-56-15.38-16.32 98040~|~1~|~1~|~01/NHS~|~NHS Resurfacing 80/20 109657~|~1~|~1~|~01/S<2~|~Resurfacing COL-344 from SLM 2.79 to 3.06 and from SLM 4.56 to 8.35 109657~|~1~|~2~|~02/STR~|~Resurfacing COL-344 from SLM 3.06 to 4.56 98699~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " District Maintenance Funding - 4CP7 (100% State) - Ding-N-Dent Guardrail repairs to damaged guardrails at various locations throughout D-05 97774~|~1~|~1~|~01/NFP~|~Construct new full service facility 95554~|~1~|~1~|~01/STR~|~On SR41, brginning @ (SLM 13.21) thru West Union and terminate at SR32 (SLM 25.17), it is proposed to resurface the highway with asphalt concrete. 80/20 split 121058~|~1~|~1~|~01/IMS~|~Interstate resurfacing 98868~|~1~|~1~|~01/MPO~|~Lighting of Water Street from Third St to McGill St, Right of Way of Second Street from rear of Veteran's Memorial Park to Liberty St. Sidewalk improvements at the intersection of Third and Water Streets. Project includes 14 pole lights, 2,000 sq ft of 5ft wide sidewalks, 2 ADA curb ramps and 650ft of curbing. 98868~|~1~|~2~|~02/MPO~|~Resurfacing of Water Street from Third Street to Washington Street, Resurfacing of Third Street from Wood Street to Water Street in the Village of Lowellville. 98868~|~1~|~3~|~03/MPO~|~100% Local items not eligible for federal funding. 109041~|~1~|~1~|~01/STR~|~Landslide repair at HOL-520-12.91. 109041~|~1~|~2~|~02/NFA~|~Landslide repair at HOL-520-11.80. 98413~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 98413~|~1~|~4~|~04/STR~|~Minor bridge work 10' to 20' span. 98413~|~1~|~5~|~05/S>2~|~Minor bridge work > 20' span. 98413~|~1~|~6~|~06/S>2~|~Minor bridge work 10' to 20' span. 98413~|~1~|~2~|~02/S>2~|~Resurfacing MAH SR 170 from 4.25 to 4.29 and 5.71 to 10.94. 98413~|~1~|~1~|~01/STR~|~Resurfacing MAH SR 170 from 0.78 to 0.86 and 1.29 to 4.25. 111652~|~1~|~1~|~01/STR~|~GSM 121826~|~1~|~1~|~01/BRO/AKRO~|~Bridge work. 107326~|~1~|~1~|~01/NFP~|~Split for signal work 98525~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement 92243~|~1~|~1~|~01/SAF~|~Ashtabula signal upgrade 98762~|~1~|~1~|~01/MPO~|~Resurfacing Belmont Ave from Martin Luther King Ave to Wirt Street in the City of Youngstown. 89302~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Lic-SR 661-00.02 to 01.70; 2) Kno-SR 661-06.09 to 06.46; 89302~|~1~|~5~|~05/S<2~|~"05/S<2/OT/ " - District Preservation Marking Pavements 4PS7(State 100%) - No CAP - Striping after resurfacing on 1) Lic-SR 661-00.02 to 01.70; 2) Kno-SR 661-06.09 to 06.46; 89302~|~1~|~4~|~04/STR~|~"04/STR/OT/ " - District Preservation Marking Pavements 4PS7(State 100%) - No CAP - Striping after resurfacing on 1) Lic-SR 661-00.00 to 00.02; 2) Lic-SR 661-01.70 to 14.81; 3) Kno-SR 661-00.00 to 06.09 89302~|~1~|~6~|~06/S<2/MTVE~|~"06/S<2/OT/MTVE" - District Preservation Marking Pavements 4PS7(State 80%) / 4BG7(Local 20%) - No CAP - Striping after Urban Paving on Kno-SR 661-06.46 to 07.41 inside the City of Mt Vernon; 89302~|~1~|~3~|~03/S<2/MTVE~|~"03/S<2/PV/MTVE" - District Preservation 4PF7(Federal 80%) / 4BG7(Local 20%) - No CAP - Urban Paving on Kno-SR 661-06.46 to 07.41 inside the City of Mt Vernon; 89302~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Lic-SR 661-00.00 to 00.02; 2) Lic-SR 661-01.70 to 14.81; 3) Kno-SR 661-00.00 to 06.09 115910~|~1~|~1~|~01/MPO~|~Plan split for eligible MPO funded work. 115691~|~1~|~1~|~01/STR~|~Replacement of existing structure. 87030~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping. 95406~|~1~|~1~|~01/NHS~|~Remove existing LMC overlay and replace with new LMC overlay using hydrodemolition. Rebuild deck edges. SFN 0600318 over Pusheta Creek. 104756~|~1~|~1~|~01/NFP~|~Spot paving on various routes throughout ATB, MAH and TRU Counties. 114586~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 12.33. Work includes drilled shaft wall. 114586~|~1~|~2~|~02/NFA~|~Landslide repair project. MRG 555 15.60. Work includes drilled shaft wall. 120989~|~1~|~1~|~01/STR~|~Work within STP Rural 120989~|~1~|~2~|~02/STR~|~Work in STP Rural 101455~|~1~|~1~|~01/STR~|~DSR# JEF-003 118844~|~1~|~1~|~01/STR~|~SR 60 from Coshocton County Line to US 62 118844~|~1~|~2~|~02/NFA~|~SR 60 from US 62 to Killbuck 113777~|~1~|~1~|~01/NFA~|~Shawnee State Forest Bridge Repair FY23 117123~|~1~|~1~|~01/S>2~|~This plan split includes all work associated with the paving work. 117798~|~1~|~1~|~01/ENH~|~TAP eligible items at 95% (utilizing 15% TRC). 117798~|~1~|~2~|~02/NFA~|~Items not eligible for Federal TAP funding (paid with 100% Local Funds). 112635~|~1~|~1~|~01/NFA~|~Chip Seal ASD-179-0.00 to 9.717 109428~|~1~|~1~|~01/NHS~|~Landslide repair project, GAL 7 29.99. GSM funded 80 federal/20 state. 106668~|~1~|~1~|~01/NFA~|~See linked structure >20' span. 116080~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 116080~|~1~|~2~|~02/NFA~|~Crack sealing ODOT facility parking lots in Massillon, Ravenna, North Lima and D4 HQ. 110490~|~1~|~1~|~01/SAF~|~Safety funded plan split 124586~|~1~|~1~|~01/IMS~|~Plan split for smart lane 101329~|~1~|~1~|~01/STR~|~Bridge replacement. 107613~|~1~|~1~|~01/S<2~|~SFN 8705224 Length 17 GA 4 93191~|~1~|~1~|~01/S<2~|~General system paving in the urban func class area:MAR-4: 13.00-13.81 93191~|~1~|~2~|~02/STR~|~General system paving in the rural func class area:MAR-4: 13.81-20.49 92450~|~1~|~1~|~01/STR~|~$1,738,125 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) program. Funds over this amount will be from the District Preservation Program budget. 112586~|~1~|~1~|~01/ENH~|~Construct hike and bike trail in Canfield Township. 101733~|~1~|~1~|~01/BRF~|~Replace Graham Rd Bridge (SFN 0433039) over East Branch of the Ashtabula River. Bridge is approximately 1.77 miles east of Stanhope-Kellogsville Rd (CR 33)/Graham Rd (CR 343) intersection. 121540~|~1~|~1~|~01/BRF~|~Bridge Rehab on CR 148 over Riffle Creek 89113~|~1~|~2~|~02/SAF/SPRF~|~Decorative pedestrian lighting. 89113~|~1~|~3~|~03/SAF/AKRN~|~City of Akron waterline replacement. 89113~|~1~|~4~|~04/SAF~|~See linked structure 10' to 20' span. 89113~|~1~|~5~|~05/SAF~|~See linked structure 10' to 20' span. 89113~|~1~|~1~|~01/SAF~|~Widening of US-224 and SR-91, Summit County, Ohio. 89113~|~1~|~6~|~06/SAF/SCE~|~Widening of Canton Road (C.R.66) in Summit County, Ohio. 89113~|~1~|~7~|~07/SAF/LAKE~|~Decorative pedestrian lighting and aesthetics within the Village of Lakemore, Summit County, Ohio. 116705~|~1~|~1~|~01/IMS~|~Resurfacing. 116705~|~1~|~2~|~02/IMS~|~Minor bridge work. 111368~|~1~|~1~|~01/NHS~|~MPO funded items split for work on NHS 111368~|~1~|~2~|~02/MPO~|~Plan Split 2 for non-NHS roadway segment. 123386~|~1~|~1~|~01/S>2~|~Plan split for roadway rehabilitation and reconstruction work items, 123386~|~1~|~2~|~02/S>2~|~Plan Split for bicycle and pedestrian improvements 123386~|~1~|~3~|~03/S>2~|~Plan split for signal work 91846~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on JEF-151-8.64 to 15.52; includes pavement repairs, pavement marking 91846~|~2~|~2~|~02/S<2~|~General System asphalt resurfacing of JEF-151-15.52 to 16.43; includes pavement repairs, pavement marking 89442~|~1~|~1~|~01/STR~|~Landslide repair utilizing dig out and replace using GSM funds at MRG 78 21.77 and MRG 78 22.23. Work length approximately 300 ft each. 80% Federal/20% State. 89442~|~1~|~2~|~02/STR~|~Change Orders 7 & 8. 106371~|~1~|~1~|~01/IMS~|~Bridge deck sealing/deck patching on IR bridges. 95350~|~1~|~1~|~01/STR~|~SFN 6200184 OTT-2-13.12 over Rusha Creek. 113911~|~1~|~1~|~01/SAF~|~Resurfacing on County Road 24 100% Safety (4HJ7). 120999~|~1~|~1~|~01/S>2~|~Large Urban portion of GRE-235 120999~|~1~|~2~|~02/STR~|~Rural sections of GRE-235 120999~|~1~|~3~|~03/NHS~|~plan split for the NHS portion of GRE-235 114412~|~1~|~2~|~02/S<2~|~Resurfacing on various roadway sections. 114412~|~1~|~1~|~01/STR~|~Resurfacing on various roadway sections. 114412~|~1~|~3~|~03/NFA~|~Resurfacing on various roadway sections. 102408~|~1~|~1~|~01/NHS~|~Major rehabilitation of US 250 from SLM 23.47 (SR 800) to Harrison County SLM 0.77 (SR 151). 102408~|~1~|~2~|~02/NFA~|~retroactive change order 101856~|~1~|~1~|~01/IMS~|~Split for jack and bore work 92035~|~1~|~2~|~02/S<2~|~CR 166 Make the eastbound right turn lane on Austin Blvd. at SR 741 a free flow lane and will also install a median between the right turn land and through lanes. 92035~|~1~|~1~|~01/NHS~|~SR 741 widen the Northbond approach to accomodate the follow-through lane for the eastbound free-flow right turn, as well as future dual northbound left turn lane. 116272~|~1~|~1~|~01/NFP~|~Created for J&C involvement 84428~|~1~|~1~|~01/S<2~|~Shoulder stabilization and resurfacing of the existing roadway with asphalt conrete on CHP US 36 16.20 to 17.18 segment length 0.98 mile total lane miles 1.96. 84428~|~1~|~2~|~02/STR~|~Shoulder stabilization and resurfacing of the existing roadway with asphalt conrete on CHP US 36 17.18 to 17.23 segment length0.05 mile total lane miles 0.100. 115690~|~1~|~1~|~01/STR~|~Rural STP resurfacing work 110437~|~1~|~1~|~01/STR/COSH~|~01/STR/PV/COSH - Plan Split 1 110437~|~1~|~2~|~02/S5K~|~Plan Split 02/S5K/PV/COSH - 106541~|~1~|~1~|~01/NFP~|~Resurfacing and repair of roads and camping pads within AW Marion State Park 96434~|~1~|~1~|~01/NFP~|~Sign mounting retrofit 102342~|~1~|~3~|~03/STR~|~Fine graded polymer overlay of SR 165 from MAH Co. Line to SR 14. 102342~|~1~|~2~|~02/NHS~|~Resurfacing work on US 62 within the City of Salem from SLM 11.39 to 11.64. 102342~|~1~|~1~|~01/NHS~|~Fine graded polymer overlay on US 62 from SR 45 to SR 14T, excluding work between SLM 11.39 to 11.64 (City of Salem). 100087~|~1~|~1~|~01/NHS~|~USR 33 SLM 16.72 to 16.94 Convert the intersection of US 33 and Wapak-Fisher Road to an offset T intersection with right turn lanes to improve safety. 100087~|~1~|~2~|~02/S<2~|~CR33A SLM 11.39 to 11.74Convert the intersection to US 33 and Wapak-Fisher Road to an offset T intersection with right turn lanes to improve safety. 106105~|~1~|~1~|~01/BRF~|~Plan Split 111474~|~1~|~1~|~01/NFA~|~Widening Orchard St in the Village of Mantua 107523~|~1~|~1~|~01/STR~|~Shoulder replacement and resurfacing of COL-172 100450~|~1~|~1~|~01/NFP~|~Split for all work 78041~|~1~|~1~|~01/SAF~|~Safety funding up to $3M for turn lanes on SR-315 with retaining walls, curb, enclosed storm sewers, pvmt overlay and repairs, signal & guardrail upgrades. This split will also fund turn lanes on SR-750. 78041~|~1~|~2~|~02/S>2~|~D6 funding to repair slip on SR-315 at 86+00/SLM 1.63 93778~|~1~|~1~|~01/SAF~|~This project is currently funded with all ODOT safety funds. Restrict southern access to Goodwill Industries to right-in/right-out; construct an extension of Springfield Park Drive to provide full access to Goodwill Industries. 96150~|~1~|~1~|~01/NFA~|~New Outpost for Hamilton County - New Harrison. 114392~|~1~|~1~|~01/NFP~|~District Preservation Funding -4PS7 (100% State) - No CAP - Superstructure replacement on SFN 4501942 LIC SR 37 25.10 88560~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing of the existing roadway in Miami County on State Route 571, County Road 25A SLM 13.42 to Northboud Ramps of Interstate 75 SLM 14.11. Urban Paving Program. 83947~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items on LOG SR 47 from SLM 0.00 to 5.23 and on LOG SR 706 from SLM 0.00 to 2.29. 97303~|~1~|~1~|~01/IMS~|~Provide new concrete overlay for bridge BEL-331-1529 (SFN 0705160) on Southbound lane and asphalt overlay on Northbound lane, to maintain Wearing Surface til bridge replacement Project is sold (PID 80599). 113995~|~1~|~1~|~01/S<2/CCEO~|~"01/S<2/05/CCEO" -80% Federal (4B77) and 20% Local (4BG7) - resurfacing of CR 16 in urbanized area (SLM 1.88 - 3.30) 113995~|~1~|~2~|~02/STR/CCEO~|~"02/STR/05/CCEO" - 80% federal (4B77) and 20% local (4BG7) - resurfacing and related work in rural area (3.30 - 6.27) 122365~|~1~|~1~|~01/NFA~|~NEVI Round 2B Corridor Group US 23-A 117007~|~1~|~1~|~01/S>2~|~Split for bridge repair work 116087~|~1~|~1~|~01/NHS~|~Asphalt resurfacing 116087~|~1~|~2~|~02/S>2~|~Asphalt resurfacing 116087~|~1~|~3~|~03/S5K~|~Asphalt resurfacing 116087~|~1~|~4~|~04/STR~|~Resurfacing 116087~|~1~|~5~|~05/NFA~|~Resurfacing 87198~|~1~|~1~|~01/NHS~|~Asphalt resurfacing and pavement repairs on TUS-250 from SLM 17.32 to 21.41 87189~|~1~|~1~|~01/STR~|~This split is for work outside the Lima Urbanized Area which is SR 81 from 3.31 to 10.72. 87189~|~1~|~2~|~02/S<2~|~This split is for work inside the Lima Urbanized Area which is SR 81 from 10.72 to 14.47. Although this work is inside the Lima Urbanized Area, it is outside the City of Lima. Therefore, there are no local funds in this split. All funds are from the District Preservation Program budget. 116733~|~1~|~1~|~01/S>2/TRCE~|~Bridge rehabilitation. 100477~|~1~|~3~|~03/S<2~|~ROS 104 11.23-11.83 20% local match 100477~|~1~|~2~|~02/S<2~|~ROS 104 (9.95-11.23) 100477~|~1~|~1~|~01/STR~|~ROS 104 (9.05-9.95) 100477~|~1~|~4~|~04/S<2~|~ROS 104 10.11 (SFN 7103573) ROS 104 11.55 (SFN 7103603) 124179~|~1~|~1~|~01/BRO~|~Replace culvert carrying SR 93 over Branch of Brush Run 117538~|~1~|~1~|~01/S5K~|~Roadway and drainage work along Ohio Ave. 117538~|~1~|~2~|~02/ENH~|~Sidewalk and curb work along Ohio Ave. This is using TAP funds. 116413~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 99584~|~1~|~2~|~02/STR~|~For bridges on SR-65 and SR-18 99584~|~1~|~1~|~01/STR~|~SR65 and SR-18 98862~|~1~|~1~|~01/NFA~|~Clark County full service facility. 87675~|~1~|~1~|~01/STR~|~Culvert Replacment 102007~|~1~|~1~|~01/S<2~|~SR 159 / Delano Road intersection improvement. 113701~|~1~|~1~|~01/SAF~|~Install ADA Compliant ped heads and push buttons with audible warning and restripe crosswalks at the intersection of US-22 and Sherman Ave in the City of Norwood. 109448~|~1~|~1~|~01/IMS~|~Block PID for FY 2025 Drainage Structures throughout District 4. 104486~|~1~|~1~|~01/S>2~|~Split for PM treatment on US-20 120381~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 91028~|~1~|~1~|~01/MPO~|~Marshall Road CR 60 0.00 - 1.04 100160~|~1~|~1~|~01/MPO~|~80% federal w/20% local matching funds for project eligible work items. 100160~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding. 101176~|~1~|~1~|~01/IMS~|~Smooth seal on Interstate routes 103927~|~1~|~1~|~01/NFP~|~Plan split 118279~|~1~|~1~|~01/SAF~|~ATH SR 56 Roundabout Project 120069~|~1~|~1~|~01/NFA~|~NEVI Round 2 680-A 22854~|~1~|~1~|~01/BRO~|~Replace superstructure on one bridge in COL County (COL-14-0758, SFN 1501410) and raise bridge to meet Vertical Clearance requirements . 107359~|~1~|~1~|~01/NFP~|~District 10 two year mowing project for CY 2024-25 along Interstates and Interstate look-a-likes (4 LN). Funded 100% state. 124652~|~1~|~1~|~01/BRO~|~Joint repair on two bridges 111896~|~1~|~1~|~01/BRF/EPAL~|~Construction of bridge with 95% Municipal Bridge funds (4R87 includes 15% Toll Revenue Credit) and 5% Local funds (4BG7). 107582~|~1~|~1~|~01/NFP~|~Paint inspection Task Order 107725~|~1~|~1~|~01/STR~|~Two-Lane resurfacing asphalt overlay project using a Type C Letting procedure. WAS SR 60 5.20-19.73 and 21.03-24.09. This PID is programmed to repair work on PID 93877. 100% State funds. 107241~|~1~|~1~|~01/NFA~|~Resurface the existing gravel lot with asphalt concrete (2.00 in.) - Auglaize County Heritage Trail Metro Park. 94153~|~1~|~1~|~01/STR~|~Funding split for all costs associated with the stream bank stabilization along SR 725. 94153~|~1~|~2~|~02/NHS~|~Funding split for all costs associated with the stream bank stabilization along SR 725 on NHS portion of the route. 112826~|~1~|~1~|~01/STR~|~Resurfacing SR 93 97420~|~1~|~2~|~02/NFA~|~Replace SFN 7843836 TRU-CR 237-00.41 Fenton Rd NW over Baughman Creek, Trumbull County, Ohio. 97420~|~1~|~1~|~01/NFA~|~Replace SFN 7845073 TRU-CR 287-1.11 Barclay North Rd over Unnamed Stream 97253~|~1~|~1~|~01/NHS~|~Concrete deck overlay on HOC 33 9.22 L (SFN 3700453) and R (SFN 3700488). NHS route funded 80 federal/20 state. 107301~|~1~|~1~|~01/CMQ~|~Upgrades to the existing signalized intersections of Montgomery Road with Highland, Plainfield, Sampson, and Elwynne. Access management improvements and upgrades to existing sidewalks for ADA compliance. 107301~|~1~|~2~|~02/S>2~|~Resurfacing of HAM-22 through the Village of Silverton. HAM-22: SLM 9.26-10.18 and 10.18-10.21 98814~|~1~|~2~|~02/IMS~|~Split for repair 98814~|~1~|~1~|~01/IMS~|~Split 1 for attenuators 110695~|~1~|~1~|~01/S<2~|~Construction Inspection 110695~|~1~|~2~|~02/S<2~|~Construction Inspection 110695~|~1~|~3~|~03/S>2~|~Balance FY2026-1 114681~|~1~|~1~|~01/NHS~|~NHS plan split 114681~|~1~|~2~|~02/S>2~|~Columbus Urban Area plan split. 114681~|~1~|~4~|~04/STR~|~Rural plan split. 114681~|~1~|~3~|~03/S5K~|~STP>5 plan split. 91433~|~1~|~2~|~02/BRO~|~Bridge rehabilitation project. Pile encasement treatment for VIN 349 0057 (SFN 8203008). BR eligible funded 80 federal/20 state. 91433~|~1~|~1~|~01/STR~|~Bridge rehabilitation project. Pile encasement treatment for VIN 278 0155 (SFN 8201811). Rural other federal aid funded 80 federal/20 state. 120184~|~1~|~1~|~01/SAF~|~Construct pedestrian improvements 102054~|~1~|~1~|~01/SAF~|~Improvement recommendation that will improve the safety and traffic flow of this intersection. 109116~|~1~|~1~|~01/SAF~|~bicycle rack installation work items that is eligible for federal-aid 119752~|~1~|~1~|~01/SAF~|~Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with RRFB. 112869~|~1~|~1~|~01/CMQ/TALL~|~Widening of East Ave by installing a center two way left turn lane, adding curbs and sidewalks in the City of Tallmadge. 115791~|~1~|~1~|~01/NFA~|~Plan split for federally eligible work items in Construction and CE 90659~|~1~|~1~|~01/MPO~|~WOO CR78 5.1-5.2 -- Poe Rd WOO SR64 3.58-3.59 90642~|~1~|~1~|~01/BRF~|~Swinehart Ave Bridge SFN 7761503 over mud run 108497~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. WAS CR 25 4.35. DSR WAS-011. Rural other federal aid funded 80 federal/20 local. 100846~|~1~|~2~|~02/S<2~|~ROS 138 0.27-1.74 100846~|~1~|~1~|~01/STR~|~ROS 138 1.74-10.87ROS 207 3.08-13.58 107852~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-38-8.24-8.95 96181~|~1~|~1~|~01/NHS~|~01/NHS/PV ; All work is in this split. Funding is 80% federa; amd 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7. 98209~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Replacement of RPM's throughout D-05. 93098~|~1~|~1~|~01/STR~|~Gap Project - Reactive Spot Paving/Repairs for MED-42-2.79 to 3.06 93098~|~2~|~2~|~02/NHS~|~Gap Project - Reactive Spot Paving/Repairs - MED-42-3.06 to 7.12, MED-224-10.45 to 15.30. 80127~|~1~|~1~|~01/STR~|~Bridge Replacement 118575~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV 101372~|~1~|~1~|~01/BRO~|~Bridge replacement project. MEG 143 4.96, SFN 5302161 and MEG 143 15.20, SFN 5302102. Rural other federal aid funded 80 federal/20 state. 100968~|~1~|~1~|~01/IMS~|~Smooth seal IR 75 in Montgomery County: MOT IR 75 SLM 3.92 to 7.53 87179~|~1~|~1~|~01/NFP~|~Crackseal on FAY-22, FAY-753, PIC-104, PIC-188, UNI-42, UNI-31, UNI-37, UNI-739 91320~|~1~|~1~|~01/STR~|~FUL US 20 7.82/10.24 Culverts 90935~|~1~|~1~|~01/SAE~|~SRTS Project (sidewalks) 90935~|~2~|~3~|~03/SAE~|~Added Plan Split for eligible items but over the Fed Max 90935~|~1~|~2~|~02/SAE~|~SRTS Project (sidewalks) 97470~|~1~|~2~|~02/BRF/LCEO~|~"02/BRF/BR/LCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - Lic-CR 211-10 SFN 4531132 - BR Eligible for replacement: L=28'; SD/FO=1; SR=39.0; DSR=8; 97470~|~1~|~3~|~03/BRO/NWRK~|~"03/BRF/BR/NWRK" - Municipal Ohio Bridge Partnership Program Funding 5MP7 (80% Federal Municipal Bridge Funds) / 4BG7 (20% Local) with Toll Revenue applied - No CAP - LIC-BVIST-6001 SFN 4560507 - BR Eligible for replacement: L=46'; SD/FO=1; SR=33.2; DSR=4; 97470~|~1~|~1~|~01/BRF/CCEO~|~"01/BRF/BR/CCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - COS-CR 19-9(County Road 19) SFN 1631578 - BR Eligible for replacement: L=25'; SD/FO=1; SR=29.3; DSR=7; 125003~|~1~|~1~|~01/IMS~|~Plan split for interstate resurfacing 106561~|~1~|~1~|~01/NFA~|~Defiance County TID will construct a connector road in the City of Defiance to provide access to Latchaw Drive. 110811~|~1~|~1~|~01/NHS~|~Split for federally eligible work 108976~|~1~|~1~|~01/SAE~|~100% Safety Plan Split 102156~|~1~|~1~|~01/S>2~|~Sidewalks 111563~|~1~|~1~|~01/BRF~|~Muni-Bridge funded items 92957~|~1~|~1~|~01/SAE~|~guardrail construct/replacement project 113549~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail on various county roads. 108314~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER Event. DSR# BEL-021. 97933~|~1~|~1~|~01/NHS~|~All roadway work to place an asphalt overlay on SR 844 and all ramps. 97933~|~1~|~2~|~02/NHS~|~Plan split to include all costs associated with the mainlin bridges including approach slabs. 82441~|~1~|~1~|~01/IMS~|~Pavement planing and resurfacing with asphalt concrete from US 40 to the MIA/MOT County Line MOT-IR-75 21.410 to 24.420 18.060 94207~|~1~|~1~|~01/BRO~|~Replace existing deck on bridge JEF-150-0510 (SFN 4102169) with a new composite deck. Convert the abutment to semi-integral and paint structural steel. Provide new approach slabs and repair/modify substructure units as necessary. 116485~|~1~|~1~|~01/NFP~|~PM (A) FY28. 91018~|~1~|~1~|~01/MPO~|~Resurfacing Glenwood Ave from Falls Avenue to Warren Avenue by MPO STP funds 111981~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2024. Funded 100% state. 106979~|~1~|~1~|~01/S<2/ZANE~|~City of Zanesville STP Funds -4TA7/ZA05 (80% Federal) / LNTP (20% Local) - No CAP - Resurfacing project in the City of Zanesville on CR 34 from 7.18 to 8.08. 106979~|~1~|~2~|~02/ENH/ZANE~|~City of Zanesville Transportation Alternative Funding - 4B37 (80% Federal) / TRC (LNTP 15% Local) / LNTP (5% Local) - See CAP Comments - Project for construction of sidewalk and curb along Ridge Ave from West Main Street to Hedgewood Ave, skipping a section from Brighton Blvd to Mead St. 118165~|~1~|~1~|~01/NFA~|~Created for J&C involvement 110253~|~1~|~1~|~01/MPO~|~WEST MAIN STREET (SR 41) CORRIDOR IMPROVEMENTS 110253~|~1~|~2~|~02/S>2~|~overlay work on MIA-41 SLM 10.32-11.14 covered under UPP funds 116849~|~1~|~1~|~01/S50~|~Urban paving 101048~|~1~|~1~|~01/IMS~|~Split for bridge work 119881~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-A 84490~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 105764~|~1~|~1~|~01/STR~|~Culvert Plan split 92926~|~1~|~1~|~01/ENH~|~Project consists of four primary objectives: (1) Decorative corridor lighting along SR-122, (2) Landscaping beds in the four quadrants of the IR-75 and SR-122 interchange, (3) Ornamental and shade trees, and (4) Gateway pylons along SR-122. 116288~|~1~|~1~|~01/NFP~|~Fence repair and maintenance on various routes throughout district 4. 81361~|~1~|~1~|~01/BRO~|~8630534 WIL CR309 0.38 Intersect: 12630 Rdd Lick Creek Cen 95248~|~1~|~1~|~01/NFP~|~Culvert replacements. STA-43-21.40, STA-172-28.50, STA-183-14.87, STA-183-22.50, STA-212-3.24. 95574~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation - ASD-042-12.46New Construction?Superstr repl (003) 121549~|~1~|~1~|~01/IMS~|~Interstate Plan Split 123606~|~1~|~1~|~01/NHS~|~Plan split for deck replacement of a bridge over NHS non-interstate expressway 124550~|~1~|~1~|~01/SAE/LOR~|~Install a single-lane roundabout at Bainbridge and Root Roads 112941~|~1~|~1~|~01/NHS~|~US 36 from 12.45 to 18.39 (excluding urban portions) 111649~|~1~|~1~|~01/SAF~|~Applying pavement markings to approximately 20 miles of various Clermont County roads. 87020~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping. 86208~|~1~|~2~|~02/STR~|~Structure Replacement SFN 6501982, PIC-104-3.45 over Lick Run 86208~|~1~|~1~|~01/STR~|~Culvert replacement PIC-104-2.95Culvert replacement PIC-104-3.82 86208~|~1~|~3~|~03/STR~|~Resurfacing of pavement between culverts 112996~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 99032~|~1~|~1~|~01/SAF~|~2019/2020 Traffic signal maintenance 120399~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established 122897~|~1~|~1~|~01/ENH/NILE~|~Streetscape improvements. 116886~|~1~|~1~|~01/SAF~|~Construct Roundabout 114808~|~1~|~1~|~01/STR~|~Rural plan split. 115498~|~1~|~1~|~01/NFA~|~Fernwood State Forest resurfacing 98764~|~1~|~2~|~02/ENH~|~Installation of sidewalk along Sycamore Road throughout the project limits. 98764~|~1~|~1~|~01/SAF~|~Improving three intersections along Sycamore Road; (1) Kenwood Road, (2) Blue Ash Road, and (3) Plainfield Road. This work will include a modern roundabout at Sycamore Road and Plainfield Road, as well as some vertical profile improvements at Kenwood Road and Blue Ash Road, and drainage improvements. 98764~|~1~|~3~|~03/NFP~|~Plan split for Greater Cincinnati Water Works (utility) upgrades being constructed in conjunction with this project. 124368~|~1~|~1~|~01/NFA~|~Village of Centerburg Downtown improvement project. 91056~|~1~|~4~|~04/STR~|~Bridge deck overlay (SRS) on SFN 6501176 and 6501273 91056~|~1~|~5~|~05/NHS~|~Bridge deck overlay (SRS) on SFN 6500358 91056~|~1~|~6~|~06/NHS~|~Install dilemma zone and stop bar detection at the PIC US 22 at SR 56 intersection 91056~|~1~|~1~|~01/STR~|~Resurfacing PIC SR 56 SLM 0.00 to 17.23. Pave over structures PIC-56-4.01, PIC-56-4.65, and PIC-56-12.67 91056~|~1~|~2~|~02/S<2~|~Resurfacing PIC-56 from SLM 17.23 to 17.36. 91056~|~1~|~3~|~03/NHS~|~Resurfacing PIC-22 from SLM 16.05 to 16.99. Pave over structures PIC-221-6.12 and PIC-22-16.29 91056~|~1~|~7~|~07/STR~|~Remove PTSWF signs and install dilemma zone and stop bar detection at the PIC US 22 at SR 104 intersection. Install dilemma zone and stop bar detection at PIC SR 56 at SR 104 intersection. 80408~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for all work using TRAC funds. 122859~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing of Maco Avenue/Lamar Hunt Way & Entry Drive, and around sheep exhibit building. 122859~|~1~|~2~|~02/NFA~|~Parking lot reconstruction south of the main entrance parking at the History Connection. 101557~|~1~|~1~|~01/S<2/COSH~|~"01/S<2/PV/COSH" - Appalachian Regional Commission (ARC) Funds 4D37 (100% Federal) - CAP $299,992.00 - City of Coshoction resurfacing of Otsego Avenue - CR 91. 110788~|~1~|~1~|~01/NFP~|~Landslide repair 113077~|~1~|~1~|~01/NFP~|~Replace Culvert 123637~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. 123637~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment. 123637~|~1~|~3~|~03/SAF~|~Shoulder widening on MEG 124 22.49-36.85 using Safety funds. 90% Federal/10% State. 99201~|~1~|~1~|~01/STR~|~LAW CR 15 1.20-5.92LAW CR 18 2.36-2.40 99201~|~1~|~2~|~02/S<2~|~LAW CR 15 0.00-1.20 & 5.92-8.54LAW CR 18 0.00-2.36 123489~|~1~|~1~|~01/NFP~|~plan split. 92637~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance Funds for Herbicidal Spraying for 2 years. 117909~|~1~|~1~|~01/NFA~|~NEVI Phase 1, I-71-A, CLI 45-69 92688~|~1~|~1~|~01/NFA~|~01/NFA/PV/ - District Preservation 4PS7 (100% State) - No Cap - Resurfacing on SR701 from SR309 to US68. 110405~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 107726~|~1~|~1~|~01/STR~|~Type A Emergency slide repair. 105540~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MAD-71-0.00-4.50 105540~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: MAD-56-6.19-6.20 & 6.35-6.95 105540~|~1~|~3~|~03/STR~|~Rural Plan Split: MAD-142-11.21-11.44 MRW-229-6.50-15.28 UNI-347-0.00-4.22 UNI-42-0.00-4.84 105540~|~1~|~4~|~04/NHS~|~NHS Plan Split: MAR-309-18.79-19.51 & 19.68-20.22 PIC-03-2.94-3.86 116322~|~1~|~1~|~01/NHS~|~All work associated with widening SR 161 and I-270 NB/WB 114465~|~1~|~1~|~01/NHS~|~Resurfacing US 22 110033~|~1~|~1~|~01/NFP~|~Construction of parking lot on the East side of the Western Reserve Bike Trail at Rome Rock Creek Road, in the Village of Roaming Shores, Ashtabula County, Ohio. 119379~|~1~|~1~|~01/S>2~|~Trail safety improvements and enhancements 100746~|~1~|~1~|~01/BRO~|~Work to replace two bridges. Funding from District Preservation Program budget using SACs 4PF7 and 4PS7. 100746~|~2~|~2~|~02/STR~|~Work to replace existing culvert with a new culvert at SLM 19.88. All work from the District Preservation Program budget. Work designed with PID 106401. 100746~|~2~|~3~|~03/BRO~|~Work to rehab a bridge designed with PID 106401. Funding from the District Preservation Program budget using SACs 4PF7 and 4PS7. 122346~|~1~|~1~|~01/SAF~|~DEL 750 from 6.667 to 6.779 and DEL14 from 0.00 to 0.038 90834~|~1~|~1~|~01/MPO~|~Installation of trees with decorative tree grates, installation of decorative lights, removal and replacement of sidewalks and existing pavers, removal and replacement of drive aprons and upgrade of bus stop with street furniture on National Road Streetscape Phase 5 project. 92691~|~1~|~1~|~01/SAF~|~Intersection Improvement 92691~|~1~|~2~|~02/SAF~|~Medina County Sanitary Engineer Water Work Items 89425~|~1~|~1~|~01/IMS~|~Guardrail Maintenance/Repair 115388~|~1~|~1~|~01/NHS~|~Plan split for bike/ped improvements. Construction of a new shared use path connection between the Little Miami Scenic Trail, across US 68 via a new pedestrian bridge, and into the new Great Council State Park. 115388~|~1~|~2~|~02/NHS~|~Plan split for roadway improvements to US-68 in the limits of this project, including the intersection with Brush Row Road. 91965~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of CAR-9-21.82 to 28.08 and COL-9-0.00 to 0.98; includes pavement repairs, pavement marking 114497~|~1~|~1~|~01/S>2~|~This plan split includes all roadwork needed to construct the separated, multi-use side path. 88897~|~1~|~1~|~01/IMS~|~Replace existing superstructure (BEL-70-1336, SFN 0702374) with a new steel beam superstructure. Repair substructure units and convert abutments to semi-integral. 92013~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation 92013~|~1~|~2~|~02/BRO~|~District staff involved with the Construction inspection 92013~|~1~|~3~|~03/BRO~|~Added $150,000 for ongoing services for the design consultant of the subject project. It would likely be encumbered in $50,000 increments. 92013~|~1~|~4~|~04/BRO~|~Ongoing services during construction 92013~|~1~|~5~|~05/BRO~|~Ongoing services during construction 92013~|~1~|~6~|~06/BRO~|~Ongoing services during construction 92013~|~1~|~7~|~07/BRO~|~$100,000 total for ongoing services for the design consultant of the subject project. It will be encumbered in $25,000 increments. this split will be used for Balance total. it has $75,000 left. COCE Ongoing 05 split will have the $25,000 encumbered amount to make the total $100,000. 92013~|~1~|~8~|~08/BRO~|~The subject project requires additional funds to extend their contract to project completion. The project experienced unanticipated delays and needs to keep inspection staff on site longer than originally planned. 92013~|~1~|~9~|~09/BRO~|~The estimated funds needed for HDR to complete the items is $20,000. The process to coordinate the remote operation testing between ODOT Central Office IT, District 2, Centurylink, and Perram . 92013~|~1~|~10~|~10/BRO~|~The estimated funds needed for HDR to complete the contract is $25,000, there mechanical and electrical expertise provided by HDR is needed. 98641~|~1~|~1~|~01/BRO~|~SFN 1100025, CHP-4-0217 on Buck Creek - replace highly skewed non-composite concrete box beam superstructure with new concrete slab deck superstructure provided the existing substructure can accomodate this change. 97132~|~1~|~1~|~01/SAE~|~District Wide contract for PM/RPM in District 8 for FY2018 95990~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation Paving 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-37-(25.08 to 25.84) and Fai-37-(00.00 to 09.73) 95990~|~1~|~2~|~02/S<2~|~"02/S>2/PV/ " District Preservation Paving Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Fai-37-09.73 to 10.40 95990~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " District Preservation Paving Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Fai-37-10.40 to 12.82 104293~|~1~|~1~|~01/NFA~|~ADA CR 10 0.14 (SFN 0136840) 92406~|~1~|~2~|~02/STR~|~Minor bridge work on 2 structures - not BR eligible:SFN 6502989, PIC-316-1.68 over Dry Run CreekSFN 6503020, PIC-316-4.31 over Big Darby Creek 92406~|~1~|~1~|~01/STR~|~2 lane resurfacing and shoulder work from SR 56 to SR 104 92664~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete from SLM 8.58 North Corp Limit of Ansonia to SLM 12.42 South Corp Limit of Rossburg. 121390~|~1~|~1~|~01/IMS~|~All Work is within this split 93300~|~1~|~1~|~01/NFP~|~Sanitary sewer work at the Morgan County Garage. 115447~|~1~|~1~|~01/S>2~|~This plan split includes all work required at the intersection of Cornell Rd at Maple Street - installation of ADA compliant curb ramps, high visibility crosswalks, flashing stop signs, and school zone pavement markings and signage. 104998~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (100% State - No CAP - Project to repair and replace damaged Guardrail District Wide 83287~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 5BP7 (80% Federal) / Plus TRC for 20% Local match- Replacement of Muskingum County bridge SFN 6037224 carrying CR41 over Moxahala Creek: BR Eligible Length = 120; SD/FO(1); SR = 15.8; DSR = 3 102980~|~1~|~1~|~01/IMS~|~Fine graded polymer AC overlay on IR: IR 75 SLM 16.35 to 18.24 99696~|~1~|~1~|~01/S>2~|~Split for resurfacing work for the entire project funded at 80% federal and 20% state 84620~|~1~|~1~|~01/IMS~|~Pvmt work on I-270: 31.70 to 36.94 84620~|~2~|~3~|~03/SAF~|~Widen IR 270 between IR 670 interchange and bridge over Big Walnut Creek 84620~|~2~|~4~|~04/SAF~|~Raise Goshen Lane structure over IR 270 due to widening 84620~|~2~|~5~|~05/IMS~|~Goshen Lane structure minor repairs and painting of structural steel 84620~|~1~|~2~|~02/IMS~|~Bridge work on 3 structures:2512289 & 2512297 FRA-270-32.37 L/R over Morse Rd2512092 FRA-270-34.87 under Agler Rd 84620~|~1~|~6~|~06/IMS~|~Work to repair roadside safety equipment damaged by traffic 76738~|~1~|~2~|~02/BRO~|~Bridge patching - noted in project description as other roadway related items on US 33 SLM 4.21. 76738~|~1~|~1~|~01/NHS~|~Resurface the existing roadway with asphalt concrete and other roadway related items on AUG US 33 from SLM 2.79 to 6.60 (segment length 3.81 total lane miles 13.90) 124634~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 60.34 (SFN 5301963). 99699~|~1~|~1~|~01/NHS~|~Resurfacing work along SR-8 in Highland Hills 121132~|~1~|~1~|~01/SAF~|~Guardrail locations in D8 112233~|~1~|~1~|~01/NFA~|~D09 Bridge Maintenance FY26 91729~|~1~|~1~|~01/NHS~|~Rehabilitate Bridges WAR-73-1818 L/R over Caesers Creek by painting the structural steel, replacing abutment bearings, patching wearing surface, patching parapets, and replacing bridge end terminal assemblies. SFN: Left: 8303010 and Right: 8303029 121242~|~1~|~1~|~01/IMS~|~conduit linked 80006~|~1~|~4~|~04/STR~|~Rehab bridges. 7306091 SCI SR00522**C : 4.940 Rehab Rural 7306121 SCI SR00522**C : 5.200 Rehab Rural 7306148 SCI SR00522**C : 7.140 Rehab Rural80/20 split 80006~|~1~|~5~|~05/NHS~|~Bridge Rehab 7306008 SCI SR00522**C : 0.220 Rehab NHS 80/20 split 80006~|~1~|~3~|~03/S<2~|~Begin @ US52 north and terminate at the Lawrence County line. It is proposed to resurface the existing highway with asphalt concrete. Location: 0.61 - 2.5980/20 split7306016 SCI SR00522**C : 0.620 Pave Thru Urban 80006~|~1~|~6~|~06/S<2~|~Bridge Rehab7306040 SCI SR00522**C : 0.980 Rehab Urban 80/20 split 80006~|~1~|~2~|~02/NHS~|~Begin @ US52 north and terminate at the Lawrence County line. It is proposed to resurface the existing highway with asphalt concrete. Location: 0.00 - 0.1880/20 split 80006~|~1~|~1~|~01/STR~|~Begin @ US52 north and terminate at the Lawrence County line. It is proposed to resurface the existing highway with asphalt concrete. Location: 0.18 - 0.61 & 2.59 - 8.2980/20 split7306067 SCI SR00522**C : 2.990 Pave Thru Rural 100467~|~1~|~1~|~01/S<2~|~Reconstruction of the roadway, including reducing from 4 to 3 lanes, curbing, sidewalks, tree lawns, street lighting and streetscape amenities. The project also consists of extending the Creekside Trail from the intersection of Springfield and Smithville to existing infrastructure, 600' SW of the current intersection. 92636~|~1~|~1~|~01/S<2~|~Resurface the existing roadway with asphalt concrete on LOG SR 540 SLM 2.03 to 2.68. 92636~|~1~|~2~|~02/STR~|~Resurface the existing roadway with asphalt concrete. LOG SR 540 2.68 to 8.72 116719~|~1~|~1~|~01/STR~|~STP Rural Plan Split 102364~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. MEG 248 0.00-9.15. Rural other federal aid funded 80 federal/20 state. 102364~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. MEG 7 14.58-18.64. NHS route funded 80 federal/20 state. 105711~|~1~|~1~|~01/NHS~|~Work on the NHS. All work on US 23, US 24, US 30 and SR 15. Funding is 80% federal and 20% state funds from the District Preservation Program. SACs 4PF7 and 4PS7. 105711~|~1~|~2~|~02/IMS~|~All work on Interstate 75. Funding is 90% federal and 10% state funds. District Preservation Program funds. SACs 4PF7 and 4PS7. 105039~|~1~|~1~|~01/SAF~|~Pavement marking project foy FY2023 Funded 100% state. 94577~|~1~|~1~|~01/BRO~|~Split for bridge rehab 101393~|~1~|~1~|~01/S>2~|~BUT SR 747 - Mill and fill with 15% full depth repairs HAM SR 126 - Mill and fill surface (1.5" over 50%) 99495~|~1~|~1~|~01/S<2~|~LAW US 52 (12.32-12.66) Rock Barrier/ Rock Removal. 117166~|~1~|~1~|~01/MPO~|~Plan split for intersection pedestrian crossing improvements eligible work. 106222~|~1~|~1~|~01/S>2~|~Widening as well as 2 way turn lane, sidepath and sidewalk additions as well as improvements to include curb, gutter and storm sewer on Grange Hall Road in the City of Beavercreek. 116613~|~1~|~1~|~01/NFP~|~Construction Inspection 88759~|~1~|~1~|~01/STR~|~Replace deteriorating wearing surface with MSC with no (minimal) approach work on AUG SR 364 1546 SFN 0603643 (SR 29) 100973~|~1~|~1~|~01/STR~|~DSR# BEL-004 123984~|~1~|~1~|~01/STR~|~A 250 foot slope stabilization on MRG 78 4.16. 117441~|~1~|~1~|~01/SAF~|~Pedestrian Improvements on Innis Road 101314~|~1~|~1~|~01/STR~|~Minor rehab on PIC-22-14.36 to 15.74. 101314~|~1~|~2~|~02/NHS~|~Minor rehab on PIC-22-15.74-16.71 and PIC-23-12.92-23.16. 101902~|~1~|~1~|~01/NFA~|~Mill & Fill Baumhart Road (CR 51) from SR 113 to Ohio Turnpike. 101902~|~1~|~2~|~02/NFA~|~Mill & fill Oberlin Road (TR 39) from SR 113 to Ohio Turnpike. 101902~|~1~|~3~|~03/NFA~|~Pavement repair and guardrail improvements on TR 54 (Murray Ridge) under Ohio Turnpike. 101902~|~1~|~4~|~04/S<2~|~For locally funded items 95555~|~1~|~2~|~02/NFP~|~Split for items of work not eligible for federal funding including utility work to be funded at 100% local. 95555~|~1~|~1~|~01/MPO~|~80/20 federal/local funding split using MPO STP (SAC 4TA7) funds to rehabilitate Woodland Avenue. 120936~|~1~|~1~|~01/BRO~|~Replace bridge carrying US 250 over abandoned railroad bed. 88973~|~1~|~1~|~01/NHS~|~Bridge Work: CRA-30-8.42 (L&R) / CRA-30-8.62 (L&R) / CRA-30-8.96 (L&R) / CRA-30-11.23 (L&R) 88973~|~1~|~2~|~02/NHS~|~Reactive Bridge Approach Paving 101772~|~1~|~1~|~01/NFP~|~Rehabilitate and resurface various roads and parking lots within Lake Isabella and Sharon Woods Park. Work consists of pavement planing, repairs, application of asphalt concrete surface course, new parking blocks, replacement of guardrail, and application of pavement markings. 112334~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2022. NHS route funded 80% Federal/20% State. 118570~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on ATH 681 0.00-7.24, HOC 278 0.00-0.26 and VIN 278 0.00-12.99. Rural other federal aid funded 80% Federal/20% State. 118570~|~1~|~2~|~02/STR~|~VIN-278-0.64 & 8.69. 97942~|~1~|~1~|~01/IMS~|~50% OOhio and 50% Kentucky Share. 115516~|~1~|~1~|~01/NFP~|~Bridge replacement. 114837~|~1~|~3~|~03/NFA~|~A.W. Marion Fog Seal and Sealcoating of Park Roads and Parking Lots. 114837~|~1~|~2~|~02/S5K~|~Work inside the Circleville Urban Area (PIC-188 from SLM 2.56 to 2.878). 114837~|~1~|~1~|~01/STR~|~Rural Plan Split (PIC-188 FROM SLM 2.878 TO 8.008) 110681~|~1~|~1~|~01/S>2~|~Resurfacing. 110681~|~1~|~2~|~02/S>2/YOUN~|~Resurfacing, urban paving in the city of Youngstown. 110681~|~1~|~3~|~03/S>2/YOUN~|~100% city items including full and partial depth repairs and ADA curb ramps. 86981~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. HOC 595 3.03-7.08. Rural other federal aid funded 80 federal/20 state. 86981~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. HOC 595 0.80-3.03. Not on any federal aid system funded 100% state. 117042~|~1~|~1~|~01/NHS~|~Major rehabilitation of pavement on BEL-7 117042~|~1~|~2~|~02/NHS~|~Plan split for replacement of BEL-7-1449 SFN 0700320 carrying SR 7 over Pinch Run. Plan split being funding with District Allocation (50%) and Major Rehabilitation funds (50%) 118367~|~1~|~1~|~01/SAF~|~Sidewalk on Gender Road 118367~|~1~|~2~|~02/ENH~|~100% Canal Winchester Items 90635~|~1~|~1~|~01/NFP~|~This is a mowing contract using maintenance operating funds. 97267~|~1~|~1~|~01/BRF~|~Pile encasement and deck edge repair. GAL 775 0.43, SFN 2704358. Off system BR eligible funded 80 federal/20 state. 97267~|~1~|~2~|~02/BRO~|~Pile encasement and deck edge repair. GAL 218 11.51, SFN 2702797. Rural other federal aid funded 80 federal/20 state. 104644~|~1~|~1~|~01/MPO~|~Resurfacing East Liberty St from US 422 to Girard East Corp Limit in the City of Girard, Trumbull County, Ohio. 99662~|~1~|~1~|~01/NHS~|~Storm sewer 99662~|~1~|~2~|~02/NHS~|~Resurfacing of SR-184. 99662~|~2~|~4~|~04/NHS~|~100% funded - City of Sylvania Storm Sewer 99662~|~2~|~3~|~03/NHS~|~ODOT maintained portion of Storm Sewer in Part 2 of the plans 99662~|~3~|~5~|~05/S>2~|~This split is for the sewer pipe at Talmadge 107910~|~1~|~1~|~01/S>2~|~Urban portions of DEL-315, DEL-42 and associated bridges 107910~|~1~|~2~|~02/STR~|~Rural portions of DEL-42 and associated bridges 107910~|~1~|~3~|~03/NHS~|~FRA-40 and associated bridges 124557~|~1~|~1~|~01/S>2/NORT~|~Resurfacing. 108592~|~1~|~1~|~01/NFA~|~The VILLAGE will reconstruct .45 miles of Commercial Ave, south of the Cross Creek Bridge to north of Wabash Ave 108592~|~1~|~2~|~02/NFP~|~The VILLAGE will reconstruct .45 miles of Commercial Ave, south of the Cross Creek Bridge to north of Wabash Ave 101901~|~1~|~1~|~01/IMS~|~Full depth bridge deck patching. 93176~|~1~|~1~|~01/S>2~|~Replace deteriorated concrete slab bridge with a new bridge deck and substructure with minimal approach work on SFN 5710448 MOT 741 0552 Tributary over Great Miami River. 96685~|~1~|~1~|~01/NHS~|~Plan Split for the items paid at 80% by ODOT and 20% by the City. This does not include any curbs, curb ramps, pavement repair, or non-roadway item. 96685~|~1~|~2~|~02/NHS~|~Plan Split for all items paid at 100% City cost. This should include pavement repair and curb ramps. 96685~|~1~|~3~|~03/S<2~|~Resurfacing on Kemper Road at 100% City responsibility 123706~|~1~|~1~|~01/STR~|~All work is within this split 89136~|~1~|~1~|~01/BRF~|~6631169 PIK CR47 3.04 Intersect: Stream CEAO 80 Fed/20 local match Pike County 01/BRF/BR/PIKE 98032~|~1~|~1~|~01/NFP~|~District 10 two-year mowing project for CY 2016-17 along Interstates and Interstate look-a-likes (4 lane) district wide. Funded 100% state. 115667~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 114141~|~1~|~1~|~01/SAF~|~ITS maintenance on power services, fiber optics and other misc. related work 110136~|~1~|~1~|~01/STR~|~Microsurfacing on LOR-58-0.00 to 4.43Double Microsurfacing on MED-303-2.83 to 4.951 110136~|~1~|~2~|~02/S>2~|~Double Microsurfacing on MED-303-4.951 to 5.998 82557~|~1~|~1~|~01/S>2~|~Improvements of approximately 1.06 miles of existing Old SR-74 providing safety and capacity upgrades. Project will include the construction of two 12-foot wide thru lanes, 4' paved shoulders, center turn lanes, curb and gutter storm drainage, street lighting, and sidewalks to accommodate future pedestrian access to adjacent residential development. Right of way width is expected to be 80 feet. Improvements are necessary as part of local network improvements associated with both the I-275/SR32 Interchange and the proposed Elick Lane/Bach-Buxton Road interchange projects. 88906~|~1~|~1~|~01/BRO~|~Replace the existing MSC overlay with new MSC ovelay on bridge (COL-164-2394, SFN 1505130). Repair substructure units (abutments and backwalls). 120694~|~1~|~1~|~01/STR/MCEO~|~Muskingum County CEAO Federal/State Exchange Programs Funding - 4C87 (95% State) / LNTP (5% Local Match) - Rehabilitation of MUS-CR 44-01.69 (SFN 6032133). 107686~|~1~|~1~|~01/STR~|~Resurfacing on SR 696 using district preservation funds (80% 4PF7 and 20% 4PS7). 120958~|~1~|~1~|~01/SAF~|~Construct roundabout at the intersection of MAD SR 665 and MAD CR 71 (Spring Valley Rd.) 121224~|~1~|~1~|~01/NHS~|~NHS culvert has been linked. 121224~|~2~|~2~|~02/STR~|~culverts linked to STP Rural 121224~|~1~|~3~|~03/STR~|~conduits linked 121224~|~1~|~4~|~04/S>2~|~conduit linked 112657~|~1~|~1~|~01/MPO~|~Resurfacing a portion of Trumbull Ave and West Liberty St. 100673~|~1~|~1~|~01/NFA~|~Chip sealing HOL-179 from SR 39 to SR 226 and resurfacing with fine graded polymer overlay from SR 3 to the Wayne Co. Line. 100673~|~1~|~2~|~02/STR~|~Resurfacing HOL-179 with fine graded polymer overlay from SR 226 to SR 3. 123613~|~1~|~1~|~01/S5K~|~Funding Split for STP 5,000-49,999 97449~|~1~|~1~|~01/BRF/PCEO~|~Perry County Engineer's Office Ohio Bridge Partnership Program Funding - 5BP7 (80% Federal) / TRC-4BG7 (20% Local) - See CAP Comments - Bridge replacement of SFN 6431941 on Per CR 64 101477~|~1~|~1~|~01/NFP~|~Resurfacing of Hudson-Aurora Road from Frost Road to City Corp Limits, within the City of Streetsboro. Includes full and partial depth repairs. 117867~|~1~|~1~|~01/S5K~|~To provide highway lighting along the SR 170 business corridor in the community of Calcutta in Columbiana County (from SLM 0.13 to SLM 1.56). 116811~|~1~|~1~|~01/NHS~|~HOC 33 14.70-16.06 WB Major Rehabilitation using full depth pavement removal and replacement. 116811~|~1~|~3~|~03/S5K~|~ATH 682 0.023-0.77 Major Rehabilitation using full depth pavement removal and replacement. 80 Federal/20 Local. 116811~|~1~|~2~|~02/S5K~|~ATH 682 0.00-0.023 Major Rehabilitation using full depth pavement removal and replacement. 80 Federal/20 State. 101070~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. 101070~|~1~|~2~|~02/S<2~|~This plan split is for the small urban route. 86698~|~1~|~2~|~02/S<2~|~Urban Smoothseal: MED 94 5.31-5.41, CRA 61 7.08-9.20, RIC 61 3.12-3.88 86698~|~1~|~3~|~03/NHS~|~NHS Smoothseal: HUR SR 18 15.32-29.19 86698~|~1~|~1~|~01/STR~|~Rural Smoothseal: MED 94 5.41-10.35, CRA 61 9.20-12.02, RIC 61 0.00-3.12 100587~|~1~|~1~|~01/STR~|~LAW 522 (0.00-8.29) 100587~|~1~|~2~|~02/STR~|~Bridge preventative maintenance.LAW 522 2.16 (SFN 4403843)LAW 522 4.19 (SFN 4403878) 120413~|~1~|~1~|~01/NHS~|~Plan split for slide repair 104170~|~1~|~1~|~01/ENH~|~Streetscape in Bolivar on Canal Street 95% Federal TAP funds and 5% Local LNTP funds. 104170~|~1~|~2~|~02/ENH/BOL~|~Streetscape in Bolivar on Canal Street; Combination of Federal ARC, State ARC, OPWC and LNTP funds. 88881~|~1~|~1~|~01/STR~|~Resurfacing SR193 2.47-7.45 88881~|~1~|~2~|~02/STR~|~NOT BR ELIGIBLE: Structures 10' to 20' span.SFN 0405167 SR193 4.85 over Pymatuning CreekSFN 0405205 SR193 5.66 over Pymatuning CreekSFN 0405264 SR193 6.72 over Pymatuning Creek 113094~|~1~|~1~|~01/STR~|~bridge plan split 79665~|~1~|~1~|~01/NHS~|~Priority system paving of FAY-35: 11.95-17.41 79665~|~1~|~2~|~02/NHS~|~Minor bridge work on 10 structures (not BR eligible):2400405 FAY US35 13.56 Intersect: Over Csx Rr (Old B&O)2400413 FAY US35 13.56 Intersect: Over Csx Rr (Old B&O)2400499 FAY US22 13.76 Intersect: Over Usr 222400502 FAY US22 13.76 Intersect: Over Usr 222400553 FAY US35 16.66 Intersect: Over Paint Creek & Cr 582400561 FAY US35 16.66 Intersect: Over Paint Creek & Cr 582400596 FAY US35 16.8 Intersect: Over Dt&I Rr (Aband.)2400618 FAY US35 16.8 Intersect: Over Dt&I Rr (Aband.)2400642 FAY SR753 17.21 Intersect: Over Sr-7532400650 FAY SR753 17.21 Intersect: Over Sr-753 106536~|~1~|~1~|~01/NFP~|~Replace two culverts within Delaware Wildlife Area 123815~|~1~|~1~|~01/BRO~|~Plan split for all work associated with OTT-51-0852 bridge 97953~|~1~|~1~|~01/ERD~|~Resurfacing of CR 158 (King Graves) from State Route 11 to State Route 193 in Vienna Township, Trumbull County, Ohio. 111613~|~1~|~1~|~01/S>2~|~City of Columbus Urban Paving Plan Split: FRA-62-17.66-18.99 25343~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 33 0678 LT (SFN 0500577) and RT (SFN 0500607), ATH 33 1569 LT (SFN 0506028) and RT (SFN 0506044), ATH 33 1580 (SFN 0506125) and ATH 50 1423 (SFN 0501549). NHS route funded 80 federal/20 state. 119198~|~1~|~1~|~01/STR~|~Rural resurfacing plan split: MAR-95-0.45-4.48 118586~|~1~|~1~|~01/MPO/OXF~|~Construction of a platform and shelters to facilitate Amtrak passenger service to the City of Oxford. Construction of a parking lot and sidewalk connection to an adjacent transit center. 87100~|~1~|~1~|~01/STR~|~District Wide project for pavement preventative maintenance on the General System. This plan split is for all work on PRE-127 from SLM 0 - 5.03. 113515~|~1~|~1~|~01/NFP~|~The improvements Eastpointe shall include removal of the existing 1,000 LF of asphalt pavement at the entrance, regrade and pack existing 304 stone base, then replace with 8? of ODOT QC MS concrete pavement. Then mill an additional 1,575? of existing pavement, 2? deep and haul off site. 116805~|~1~|~1~|~01/NHS/MUNF~|~Resurfacing, urban paving in Munroe Falls. 116805~|~1~|~2~|~02/NHS/HUDS~|~Resurfacing, urban paving in the city of Hudson. 116805~|~1~|~3~|~03/NHS~|~Resurfacing. 116805~|~1~|~4~|~04/NHS~|~Bridge preventative maintenance 113908~|~1~|~1~|~01/STR~|~Landslide repair project GAL 588 11.10-11.12. 100% Federal ER funds. 90705~|~1~|~1~|~01/MPO~|~LUC CR125 1.24-1.26 - LUC SR64 0.18-0.2improve the intersection of State Route 64 and River Rd in the City of Waterville 100308~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay to STA SR 800 from 0.00 to 3.62. 100308~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to STA SR 800 from 3.62 to 7.04. 108138~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8 108138~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. 110530~|~1~|~1~|~01/IMS~|~Bridge Plans split 116117~|~1~|~1~|~01/NHS~|~Resurfacing and related work. 96832~|~1~|~2~|~02/S>2~|~100% local items not eligible for normal project funding. 96832~|~1~|~1~|~01/S>2~|~Funding for all work 95404~|~1~|~1~|~01/CMQ~|~East Cleveland city wide signal upgrade and coordination mainly along Euclid Avenue using MPO CMAQ funds @ 80% federal and 20% local match. 76391~|~1~|~1~|~01/IMS~|~Plan Split for Pavement for SUM IR 77 from 4.05 to 7.44 76391~|~1~|~2~|~02/IMS~|~Plan Split for Bridges SFN 7702299, SFN 7702329 SUM 77 04.51 L&R over SR 241, SFN 7702345, SFN 7702434 SUM 77 06.72 L&R over Arlington Rd, SFN 7702469 SUM 77 07.44 under Killian Road, SFN 7711131 SUM 619 09.26 over I - 77. 109402~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers. 105635~|~1~|~1~|~01/IMS~|~Mowing Contract 113434~|~1~|~1~|~01/SAF~|~Improvements at two roundabouts on Main St 101427~|~1~|~1~|~01/IMS~|~Reface Mt. Adams wall 103299~|~1~|~1~|~01/NFP~|~Split for lighting work 114517~|~1~|~1~|~01/S<2~|~Overlay on HIG 41. 101374~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 266 11.47 (SFN 5801265) and NOB 821 0.68 (SFN 6105254). Federal STP 80% and 20% State. 117937~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties. 103709~|~1~|~1~|~01/IMS~|~Pavement Split 118884~|~1~|~1~|~01/MPO~|~Full signal upgrade, turn radius improvements, installation of sidewalks, crosswalks and curb ramps at the intersections of Shawnee Road and Dixie Hwy. with Breese Road. Addition of a westbound right turn lane at Breese Road and Shawnee Road. All work included in this split. 114044~|~1~|~1~|~01/SAE~|~Installation of new traffic signal at Olde Eight/Twinsburg Rd intersection. 98541~|~1~|~1~|~01/SAE~|~Systematic sign upgrades in villages and other missed areas that need upgrading in Warren County. 93153~|~1~|~1~|~01/BRF~|~Bridge replacement project. GAL TR 766 0.05 (SFN 2743566). Federal 80% and 20% Local. 110053~|~1~|~1~|~01/STR~|~Slide repair PIK 335 16.05 98491~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 98491~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span. 98491~|~1~|~1~|~01/STR~|~Resurfacing. 98491~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 112151~|~1~|~1~|~01/NFP~|~District-wide construction engineering services. 114587~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 681 4.95. 114587~|~1~|~2~|~02/STR~|~Landslide repair project. MEG 681 5.51. Work includes drilled shaft wall. 83058~|~1~|~1~|~01/STR~|~JAC SR776 0.00 ResurfacingThis includes PIK SR776 beginning at the Scioto County line (0.00) thru Pike County and terminating at the Jackson County Line (0.99). Then beginning at the Pike County heading north east to the corporation limit of the City of Jackson.These brdgs are pave thru.4003942 JAC SR776 0.65 Intersect: Trib Of Little Scioto4004019 JAC SR776 1.65 Intersect: Trib Of Mcdowell Run4004094 JAC SR776 3.91 Intersect: Trib Of Brushy Fork4004124 JAC SR776 4.12 Intersect: Trib Of Brushy Creek4004159 JAC SR776 4.4 Intersect: Trib Of Brushy Fork4004175 JAC SR776 6.18 Intersect: Trib Of Brushy Creek4004205 JAC SR776 7.86 Intersect: Buckeye Creek4004264 JAC SR776 10.87 Intersect: Trib Of Salt Lick CreekCO CC 01 Rural plan split added.80/20 split 83058~|~1~|~3~|~03/S<2~|~JAC SR776 0.00 ResurfacingBegin project at the Pike County heading north east to the corporation limit of the City of Jackson.80/20 splitCO CC 02 Urban plan split added. 83058~|~1~|~2~|~02/STR~|~JAC SR776 0.00 ResurfacingBegin project at the Pike County heading north east to the corporation limit of the City of Jackson.CO CC 01 Brdgs added for SFN's 4404051 ($53,875) & 4403993 ($95,875) for total of $149,664.00Brdg Rehab4003993 JAC SR776 1.5 Intersect: Mcdowell Creek4004051 JAC SR776 2.03 Intersect: Little Scioto River6603335 SR776 0.050 80/20 split 95882~|~1~|~1~|~01/STR~|~It is proposed to perform microsurfacing on SR138 beginning at SLM 0.00 (SR134) and terminate at SLM 7.03 (SR131). 80/20 split 109784~|~1~|~1~|~01/NHS~|~AC overlay without repairs 109784~|~1~|~2~|~02/STR~|~AC overlay without repairs 112922~|~1~|~2~|~02/S<2~|~JAC 788 0.49-2.39 112922~|~1~|~1~|~01/S<2~|~JAC 788 0.02-0.49 Local Match 112922~|~1~|~3~|~03/S<2~|~Bridge maintenance. 112922~|~1~|~4~|~04/NFP~|~Retroactive fuel price adjustment 115202~|~1~|~1~|~01/CMQ~|~Widen the roadway from two to three lanes, install street lights and construct a 10' tree lined multi-use path. 96092~|~1~|~1~|~01/BRO~|~District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3000184 GUE US22 4.69 Intersect: Us 22 Over Jackson Run; BR Eligible for Rehabilitation: Length=28 SD/FO(1) SR=58.9 DSR=4 109656~|~1~|~1~|~01/S<2~|~Resurfacing COL-62 from SLM 0.00 to 1.13, SLM 2.61 to 3.87, and SLM 4.40 to 4.86 109656~|~1~|~2~|~02/STR~|~Resurfacing COL-62 from SLM 1.13 to 2.61, and SLM 3.87 to 4.40 110771~|~1~|~1~|~01/STR~|~Landslide repair. VIN 93 6.67-6.69. Funded 100% State ER. 124604~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to install new pavement markings on various county roads. 100774~|~1~|~1~|~01/IMS~|~Plan split for interstate locations on this project, such as FRA-270-17.10-18.56. 100774~|~1~|~2~|~02/NHS~|~Added NHS plan split for locations such as FRA-40-6.44-7.53 123560~|~1~|~1~|~01/IMS~|~Replacing R-W/R striping installed in 2021 98379~|~1~|~1~|~01/S<2/CONN~|~Resurfacing ATB SR 7 from 31.37 to 32.32 and ATB SR 531 from 21.21 to 22.72 urban paving in the City of Conneaut. 98379~|~1~|~2~|~02/S<2~|~Minor work to linked structures >20' span. 98379~|~1~|~3~|~03/S<2~|~Minor work to linked structure with a 10' to 20' span. 98379~|~1~|~4~|~04/S<2/CONN~|~100% City of Conneaut items, including partial and full depth repairs, curb ramps. 97301~|~1~|~1~|~01/IMS~|~Plan split for signal work 115480~|~1~|~1~|~01/NFP~|~Plan split for non-PID related work 105543~|~1~|~1~|~01/STR~|~Rural plan split: DEL-257 DEL-605 82552~|~1~|~1~|~01/MPO~|~Reconstruction of existing Clepper Lane from Gate Drive, east of Glen Este-Withamsville Road. Realignment and extension of existing Clepper Lane further east, to tie into Bach-Buxton Road. Improvements include a minimum of two 12' wide lanes with 4' wide paved shoulders, turn lanes for drive access and at side streets, installation of curb and gutter, roadway lighting, and sidewalk on the south side of the road. 77439~|~1~|~1~|~01/NHS~|~District Allocation 106132~|~1~|~1~|~01/NFA~|~Landslide repair, NOB 564 13.22. Not on any federal aid system funded 100% state. 109822~|~1~|~1~|~01/NHS~|~BRO 125 0.00-6.42 109822~|~1~|~2~|~02/STR~|~BRO 125 15.78-15.84 88372~|~1~|~1~|~01/BRO/PCE~|~Bridge rehabilitation of sfn#6738206, POR-CR52-2.78 over the West Branch Reservoir, Portage County, Ohio. 89453~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/PV/CAMB" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Cambridge on Gue-SR 209-07.64 to 08.11 89453~|~1~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Gue-SR 209-07.07 to 07.64; 89453~|~1~|~5~|~05/S<2/CAMB~|~"05/S<2/OT/CAMB" - Local Match 4BG7 (100% Local) - No CAP for ADA Ramps in the City of Cambridge, Gue-209-07.64 to 8.11 89453~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on 1) Mus-SR 209-00.00 to 01.64; 2) Gue-SR 209-00.00 to 05.54; 89453~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Gue-SR 209-05.54 to 07.07 112684~|~1~|~1~|~01/S<2~|~Asphalt resurfacing of SR 43 112684~|~1~|~2~|~02/S<2~|~100% City items, including auxiliary pavement markings and curb ramps 94005~|~1~|~1~|~01/IMS~|~90/10 federal/state funding split for all work. 85350~|~1~|~1~|~01/ENH/NEWL~|~Village of New Lexington Transportation Alternatives Funding - 4B37 (Federal 80%) / TRC (4BG7 15%) / 4BG7 (Local 5%) - See CAP Comments - Enhancement of New Lexington downtown area by the installation of new sidewalks with decorative brick pavers, decorative lighting and various other enhancements.Construction Inspection will be performed through the District 5 Construction Office. 116816~|~1~|~1~|~01/STR~|~Rural 114026~|~1~|~1~|~01/NFP~|~All work in this project. 111638~|~1~|~2~|~02/SAE~|~Work funded by the safety program. 100% federal funds SAC 4HJ7. The safety funding is being used to replace Type A anchor assemblies with appropriate Mash 2016 anchor assemblies and up to 50? of guardrail at each anchor assembly. 111638~|~1~|~1~|~01/IMS~|~Work funded with 100% federal funds from the District Preservation Program SAC 4PF7 at overheads on the Interstate system. The preservation funding covers any additional work requested by Highway Management not covered by the Safety Program funds which are in another plan split. 111638~|~1~|~3~|~03/NHS~|~Work funded with 100% federal funds from the District Preservation Program SAC 4PF7 at overheads on the NHS system. The preservation funding covers any additional work requested by Highway Management not covered by the Safety Program funds which are in another plan split. 120354~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4. 98992~|~1~|~1~|~01/S>2~|~Shipyard access road. 100977~|~1~|~1~|~01/NHS~|~DSR# COL-004 102771~|~1~|~1~|~01/S>2~|~This plan split is work on the large urban bridge. 102771~|~1~|~2~|~02/STR~|~This plan split is for work on rural bridge. 88990~|~1~|~1~|~01/CMQ~|~Plan Split for SUM West Exchange Signals 88990~|~1~|~2~|~02/NFP/Akrn~|~Non-eligible signal items. 113595~|~1~|~1~|~01/NFP~|~Created for J&C involvement 124610~|~1~|~1~|~01/IMS~|~Plan Split for preventative maintenance work on interstate bridges based on critical findings report 124965~|~1~|~1~|~01/SAF~|~TAP/Safety eligible expenses 123867~|~1~|~1~|~01/IMS~|~Emergency repairs to bridge following truck hit 114443~|~1~|~1~|~01/IMS~|~Resurfacing IR 70 124804~|~1~|~1~|~01/BRO~|~Repair bridge by repairing and encasing the pier piling. 124545~|~1~|~1~|~01/STR~|~Reconstruction 114609~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance 88923~|~1~|~1~|~01/NHS~|~Remove existing bridge (HAS-22-1724, SFN 3400964) over US 22, and realign road being carried by bridge to a new alignment to eliminate need for a replacement structure. 88923~|~1~|~2~|~02/NFA~|~Relocation of TR 243 resulting from removal of bridge over US 22 (HAS-22-1724). 90433~|~1~|~1~|~01/NFA~|~Culvert replacement project. WAS 260 10.20 (SFN 8403937). Not on any federal aid system funded 100% state. 88871~|~1~|~1~|~01/STR~|~general system chip seal pavement in various locations 92463~|~1~|~1~|~01/STR~|~SFN 3503186 HEN SR109 20.41 Intersect: Dry Creek 117090~|~1~|~1~|~01/MPO~|~Primary Plan Split for all eligible work. 117090~|~1~|~2~|~02/SAE~|~Safety-funded work to remove the bump in on the south side at the intersection of Sylvania and Bellevue, installing high visibility crosswalk markings at that intersection, as well as installing the Rectangular Rapid Flashing Beacon and refresh the high visibility crosswalk markings at the Chessie Circle Trail 117090~|~1~|~3~|~03/NFP~|~Plan Split for locally funded scope, including signal upgrade that was not included in Safety award. 96387~|~1~|~1~|~01/NFP~|~Demolition of three structures associated with widening project. 92005~|~1~|~1~|~01/S<2/HIG~|~SR73/Harry Sauner Road intersection and Harry Sauner Rd/Caretown Rd (CR10A)Intersection. Part 3. Part 1 & Part 2 are under PID 83987. 87618~|~1~|~1~|~01/S>2~|~Upgrade Storm Sewer on MAH SR 7 7.39 96362~|~1~|~1~|~01/STR~|~Rebuild deck edges and overlay bridge deck with LMC using hydrodemolition. Patch abutment corners. SFN 5401208, MER SR 117-0181 on Town Run Creek. 100449~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chipseal treatment. WAS 26 11.85-18.45. Rural other federal aid funded 80 federal/20 state. 121405~|~1~|~1~|~01/NFA~|~Beach Road Rehabilitation (SFN 2535882) 108113~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB CR 15 0.04, SFN 6132111. Funded by the Ohio Bridge Partnership Program, 100% Federal. 104879~|~1~|~1~|~01/NHS~|~SCI 23 16.51 (SFN 7300395) 99050~|~1~|~1~|~01/NFA~|~This project is for construction inspection FY16 99050~|~2~|~2~|~02/NFA~|~Project is for construction inspection in FY17 99050~|~3~|~3~|~03/NFA~|~This project is for inspection in FY15 119138~|~1~|~1~|~01/BRO~|~Plan split for CEAO LBR funding eligible work to replace the structure (bridge SFN 2830493). 118910~|~1~|~1~|~01/NFP~|~Spot paving throughout the district 76779~|~1~|~3~|~03/IMS~|~Plan split for work on Major Bridge (CUY-90-07.58) 76779~|~1~|~1~|~01/IMS~|~Split for major rehab work 76779~|~1~|~2~|~02/IMS~|~Plan split for Bridge Rehab work to be completed with pavement reconstruction. 112614~|~1~|~1~|~01/ENH~|~Installing sidewalks along Myron St in the City of Hubbard. 104883~|~1~|~1~|~01/NFP~|~D09 Auxiliary Markings (A) FY2023 103405~|~1~|~1~|~01/STR~|~Landslide repair 90809~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 160 0.00-8.92, VIN 324 0.00-4.44 and VIN 349 0.00-1.28. Federal 80% and 20% State. 114081~|~1~|~1~|~01/SAF~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4. 92611~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for work from SLM 0.00 to SLM 0.52 using federal STP funds. 92611~|~1~|~2~|~02/NHS~|~80/20 fed/state funding split for work from SLM 0.52 to the NCL using NHS funding. 110533~|~1~|~1~|~01/S<2~|~Bridge Plan Split 112546~|~1~|~1~|~01/MPO~|~Split for MPO-funded work. 99229~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-TR 90-0.02 (SFN: 0932868) which carries Myers Road over Browns Run. 123508~|~1~|~1~|~01/STR~|~All work on bridges included under the STP Rural classification. 121163~|~1~|~1~|~01/STR~|~All Work is within this split 107885~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 550 15.70-15.74. DSR ATH-004. Funded 100% federal. 120489~|~1~|~1~|~01/S>2~|~Plan split for DEL-257-1.25 box beam bridge rehab. 108707~|~1~|~1~|~01/NFP~|~Change Gov. & Lt. Gov. names, & Ohio Slogan on various State Line signs throughout District 9. 88548~|~1~|~1~|~01/MPO/Huds~|~Update signal. Improve curb and gutter. SR91 15.20-15.21 turn lane addition. In the City of Hudson, Summit County, Ohio. 111520~|~1~|~1~|~01/MPO~|~Upgrades to all existing signalized intersections in the City of Springdale, OH. 111520~|~1~|~2~|~02/MPO/SPR~|~Plan split for work at signalized intersections that do not meet warrants (SR 747 & Cassinelli Square, SR 4 & Maple Trace Drive, W. Kemper Road & Lawnview Avenue, Chesterdale Road & School, and Crescentville Road & Tivoli Lane). 108383~|~1~|~1~|~01/NFA~|~Landslide repair project. WAS 260 9.00-9.04. WAS_NF_0004. Non federal aid routed funded 100% state ER. 124432~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 101430~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for D05-BrCleaning-FY21/222 122440~|~1~|~1~|~01/MPO~|~TLCI items 122440~|~1~|~2~|~02/ENH~|~Local-only items 116033~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - 88491~|~1~|~1~|~01/STR~|~A 2-lane resurfacing from SLM 0.00 to SLM 9.11 in Williams County. 88491~|~1~|~2~|~02/STR~|~WIL-20-6.44 bridge, SFN 8600996 concrete deck overlay. 111614~|~1~|~1~|~01/SAF~|~Installation of northbound left turn lane at SR 13/Cristland Hill Road intersection and related roadway work. 108936~|~1~|~3~|~03/SAF~|~high visibility crosswalk markings on US-127 108936~|~1~|~1~|~01/S>2~|~FU2022 Urban Paving in the City of North College Hill on US 127. This plan split is 80% ODOT and 20% City items on the Urban Portion of US 127. 108936~|~1~|~2~|~02/S>2/NCH~|~FY2022 Urban Paving in the City of North College Hill on US 127. This plan split is the 100% City items on the urban portion on US 127. 108936~|~1~|~4~|~04/S>2~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 80% ODOT and 20% City items on the Urban portion of US 127. 108936~|~1~|~5~|~05/S>2/MTH~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 100% City items on the urban portion of US 127. 108936~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 84397~|~1~|~2~|~02/MPO~|~Plan Split for new precast structure over Little Cuyahoga Creek 84397~|~1~|~1~|~01/MPO~|~Plan Split for building a new route between Eagle Street and Englewood Drive 110163~|~1~|~2~|~02/S<2~|~Resurfacing inside the Lima Urbanized Area but outside of the City of Lima. Work is on SR 115 in Allen County from where it begins at SR 65 at SLM 0.00 to the Lima Urbanized Area Boundary 0.35 from that location at SLM 0.35. All funds from the district preservation allocations. 110163~|~1~|~1~|~01/STR~|~Resurfacing outside of the Lima Urban Area using district preservation allocations. All work in this project on SR 115 in Allen County except to the portion of SR 115 which is in the Lima Urbanized Area. 109856~|~1~|~1~|~01/STR~|~PIK 220 5.50-7.03 & 9.77-10.96 109856~|~1~|~2~|~02/S<2~|~PIK 220 7.03-8.20 & 9.55-9.77 & 10.96-13.42 108706~|~1~|~1~|~01/NHS~|~Bridge replacement in the City of Kettering. 98408~|~1~|~2~|~02/S>2~|~Resurfacing of MAH SR 7 from 4.54 to 11.26. 98408~|~1~|~3~|~03/S>2~|~Minor Bridge work 10' to 20' span. 98408~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 7 from 3.58 to 4.54. 98408~|~1~|~4~|~04/S>2~|~Replacing existing culvert. 98408~|~1~|~5~|~05/S>2~|~Ped improvements at State Route 7 and Stadium Dr, SLM 8.34. 119134~|~1~|~1~|~01/STR~|~added plan split 115793~|~1~|~1~|~01/NFP/WCEO~|~Replacement of the superstructure of Bridge No. WAR-TR 71-0.39 (SFN: 8334439) 93274~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of SFN 4201655 KNO US36 26.93 Intersect: Jelloway Creek; Not BR Eligible for Rehabilitation: Length=132 SD/FO(0) SR=85.9 DSR=5 110364~|~1~|~1~|~01/STR~|~HIG 134 5.18-11.24 124195~|~1~|~1~|~01/SAE~|~This is a split for 100% Safety funding. 98280~|~1~|~1~|~01/NHS/NEWA~|~"01/NHS/BR/NEWA" - plan split 01 for Lic-13-1034 118822~|~1~|~1~|~01/NHS~|~Plan split for resurfacing and drainage work on SEN-18 121909~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 32 2.62 (SFN 8435251). 90791~|~1~|~1~|~01/S>2~|~Project will improve the roadway by resurfacing the existing pavement surface. Pavement will be milled 2in in the existing 2-lane section of roadway, and 3.5in in the 3 and 4-lane sections. The existing loop detectors at the southern leg of the SR-725 intersection will also be replaced. 109608~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 376 6.02, SFN 5801680. 97432~|~1~|~1~|~01/BRF~|~Work to include replacing the superstructure. 95% state funds SAC 4C87. The County Engineers Association of Ohio (CEAO) and ODOT approved the project to be part of the Federal/State Exchange Program. The 5% match is provided by the Allen County Engineer. 116629~|~1~|~1~|~01/NHS~|~NHS 103642~|~1~|~1~|~01/S<2~|~DSR BEL-015 93851~|~1~|~1~|~01/BRF~|~Remove existing superstructure and beam seats to replace with new superstructure. Install a semi-integral abutment on two rows of drilled piles behind existing abutments. Stabilize abutments and wingwalls as necessary through grout injection and re-pointing of stonework. Cast-in-place a composite reinforced concrete deck and sidewalk on new steel beams. Install CIP concrete fascia barriers all on SFN 7560931 SHE WMICH 0568. 93851~|~1~|~2~|~02/NFA~|~The City of Sidney wants to relocate a fire hydrant, as part of this project. A new service line from the main to new hydrant location will be provided. 93851~|~1~|~3~|~03/NFA~|~Catch basin work caused by a construction error. 86983~|~1~|~1~|~01/S<2/HEBR~|~"01/S<2/OT/HEBR" - Village of Hebron project to add sidewalk and decorative lighting to enhance CR79A -4TA7/LC05 LCATS (80% Federal) / 4BG7 (20 Local) - CAP - Funding cap of $1.1 million. Lic-CR 79-00.89 to 01.76 110287~|~1~|~1~|~01/NHS~|~Repair and reconstruction of approximately 100 ft. of roadway embankment along SR-126 westbound. Work will require embankment repair and will require R/W. 99571~|~1~|~1~|~01/SAE~|~Installation of pavement markings on various Ashland County roads. 99571~|~1~|~2~|~02/SAE~|~Split for Ashland 85064~|~1~|~1~|~01/BRF~|~bridge replacement 112936~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MRW-71-3.23-12.20 102744~|~2~|~3~|~03/NHS~|~Minor bridge work > 20' span. 102744~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the City of Akron. 102744~|~1~|~2~|~02/MPO/AKRO~|~100% Akron items such as ADA curb ramps and full and partial depth repairs. 118602~|~1~|~1~|~01/STR~|~Culvert replacement 108792~|~1~|~1~|~01/S>2~|~Replace local bridge 87975~|~1~|~1~|~01/SAF~|~Upgrade existing signing along SR 126 in Hamilton County from logpoint 6.61 to 18.25. 97964~|~1~|~1~|~01/STR~|~SR 54 SLM 4.88 to SLM 11.75 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in.) 103345~|~1~|~1~|~01/S<2~|~Resurfacing and full depth repair where necessary on Jamaica Road from SR-123 to the north Carlisle Local School District limit. 119699~|~1~|~1~|~01/BRF~|~All work included in this split. 24857~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 124651~|~1~|~1~|~01/SAF~|~Construction of loop trail around Bicentennial Commons Park 124651~|~1~|~2~|~02/NFP~|~100% locally funded plan split for parking lot 96151~|~1~|~1~|~01/NFP~|~Construction of a new outpost facility on Wright State University for multi-agency use. 103781~|~1~|~1~|~01/NFA~|~LAW CR 104 2.40 (SFN 4445082) 95747~|~1~|~1~|~01/NHS~|~LUC-2 from SLM 5.45 to SLM 10.67 117869~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 111321~|~1~|~1~|~01/SAE~|~Pavement marking on various routes in Highland County. 115230~|~1~|~2~|~02/STR~|~Resurfacing on SR 301 from West Salem north corporation limit to US 224 Intersection 115230~|~1~|~1~|~01/SAF~|~Shoulder widening on WAY/MED-301 from West Salem Rd to Williams Rd. 114660~|~1~|~1~|~01/S>2~|~Project to Pave inverts of bridge size culverts and perfrom other related repairs Including HAM-747-0195 114660~|~1~|~2~|~02/IMS~|~Rehab of HAM-74 bridge size culvert 114660~|~1~|~3~|~03/IMS~|~HAM-275 culvert - Not Federal Bridge size 114660~|~1~|~4~|~04/NHS~|~CC funding event for HAM-2126 structure (NHS) 88362~|~1~|~1~|~01/NFA~|~Replacement of MAH - North Lima Outpost facility. 111637~|~1~|~1~|~01/NFP~|~Plan split for tree trimming work. 85678~|~1~|~1~|~01/SAF/HIG~|~Highland County CR5/CR74/TR192 Intersection improvementAll Non Fed Aid Routes but categorized as Safety since 80% CEAO safety funds are being utilized.It is proposed to improve the intersection of CR5 (Prospect Rd), CR74B (Pleasant Rd), & TR192A (Main Rd) by vertical profile adjustments at the intersection to meet 55 mph design standards and intersection and vertical sight distance standards. Marshal Twp, 1.23 mile east of SR125, intersections of CR5, CR74B, & T192A. HIG-CR-5 CHIGCR00005**C 17.660 to 17.670HIG-CR-74 CHIGCR00074**C 3.700 to 3.710 HIG-TR-192 THIGTR00192**C 0.000 to 1.010 115051~|~1~|~1~|~01/NFA~|~Medina County Park District's to Pave and Strip the parking lot at Killbuck Lakes. 80680~|~1~|~2~|~02/STR~|~All reference items except CMAQ eligible. 80680~|~1~|~1~|~01/CMQ~|~CMAQ eligible items on two roundabouts. 124510~|~1~|~1~|~01/STR~|~Replace superstructure 103924~|~1~|~1~|~01/STR~|~Culvert Replacement: MED-162-11.70 124615~|~1~|~1~|~01/S5K~|~Install new guardrails and upgrade current guardrails on various county roads. 100299~|~1~|~1~|~01/NHS~|~Microsurfacing of SUM US 224 10.22 to 11.22 and 12.71 to 14.05, SUM SR 91 0.30 to 0.72, SUM SR 93 5.98 to 7.78, SUM SR 241 6.70 to 7.78. 108335~|~1~|~1~|~01/S<2~|~OH18-01 ER Event. Landslide repair project. MOE 536 1.97, DSR MOE-020. Urban other federal aid funded 100% federal. 100754~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. MRG 83 10.33-15.60 snf NOB 83 0.00-6.77. Rural other federal aid funded 80 federal/20 state. 97936~|~1~|~1~|~01/NFP~|~Heat straightening of bridge beams of SFN# 7602340 over US-62, in the City of Canton, Stark County, Ohio. 120450~|~1~|~1~|~01/S5K~|~Bridge Rehab 124471~|~1~|~1~|~01/S5K/STCE~|~Superstructure replacement. 106471~|~1~|~1~|~01/IMS~|~FRA IR 71 SB from 27.77 to 29.66 DEL IR 71 SB from 0.00 to 0.84 FRA IR 270 IR 71 SB to IR 270 WB Ramp widening Provide additional SB lane by restriping and widening pavement. Widen SB to WB ramp to two lanes 106471~|~1~|~2~|~02/IMS~|~Project Delay Costs due to DB scope issue 82872~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. WAS 7 31.55-37.23. NHS Federal/State 80/20%. 110860~|~1~|~1~|~01/STR~|~Slide repair ADA-125-22.18 94797~|~1~|~1~|~01/S<2~|~STP:-resurfacing only between station 187+25 and 205+00-all bridge work at Buck Creek and associated MOT costs-all costs associated with the profile adjustment and resurfacing from station 2017+00 to Columbus Avenue. 94797~|~1~|~2~|~02/CMQ~|~CMAQ:-all widening, drainage, striping, MOT, underdrains, and all asphalt for widening/resurfacing for the roadway and bike lanes between SR4 and the existing bike trail at station 187+25 (essentially all work from SR 4 to 187+25); the roadway resurfacing can be included with CMAQ on the sections where we add bike lanes; -left turn lane addition from station 205+00 to station 217+00; include all pavement costs, grading/drainage/striping/MOT/etc. -any drives impacted by the bike lanes or left turn lane; 108519~|~1~|~1~|~01/IMS~|~See linked structure > 20' span. 84663~|~1~|~1~|~01/IMS~|~Resurface IR 70 with Item 446 asphalt concrete on CLA IR 70 10.55 to 13.98. 91608~|~1~|~2~|~02/NHS~|~Flood entire decks with SRS (Soluble Reactive Silicate) 705.24 at various locations on USR 35 91608~|~1~|~1~|~01/BRO~|~Deck overlay on SFN 5701929 MOT US 35 15.76 89422~|~1~|~1~|~01/STR~|~District Wide Pavement marking - Routes/Classifications coming 94444~|~1~|~1~|~01/NHS~|~Bridge Coating- All locations on ERI-SR-002 and ERI US-006. 94444~|~1~|~2~|~02/IMS~|~Bridge Coating-MED IR 0076 01.30R 97032~|~1~|~1~|~01/NFA~|~It is proposed to install install new guardrail at various locations on CR's 85 & 116 in Pike County in FY 2015 97032~|~1~|~2~|~02/S<2~|~CR 116 (0.00 to 2.56) 82889~|~1~|~3~|~03/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 146 8.15-8.33 and NOB 147 0.00-2.60. Not on any federal aid system funded 100% state. 82889~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 285 0.00-0.30. Urban other federal aid funded 80 federal/20 state. 82889~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 146 8.33-9.40, NOB 215 0.00-4.61 and NOB 285 0.30-5.31. Rural other federal aid funded 80 federal/20 state. 107062~|~1~|~1~|~01/STR~|~Bridge replacement project on MEG 124 55.30, SFN 5301809. 119688~|~1~|~1~|~01/S>2~|~Install a shared use path along Dublin Rd from 1,650' south of Noreen Dr to Limestone Ridge Dr. 115257~|~1~|~1~|~01/ENH~|~Construct Shared Use Path. 115257~|~1~|~2~|~02/S5K~|~Asphalt Resurfacing of SR 259 in the City of New Philadelphia, funded at 80/20 with D11 Preservation Funds. 96841~|~1~|~1~|~01/SAF~|~Installation of RRFB 116785~|~1~|~1~|~01/ENH~|~Multi-use path on Big Walnut Trail from Turtle Station Way to Mt. Hood Court (Alum Creek Trail). 119880~|~1~|~1~|~01/BRF~|~Bridge replacement funding at 100% with Municipal Bridge Federal Funds. 109981~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 376 8.10-8.20. 100% Federal ER funds. 109981~|~1~|~2~|~02/STR~|~Landslide repair project. MRG 376 8.10-8.20. 80% Federal ER and 20% State funds. Associate Add 122884~|~1~|~1~|~01/NFP~|~All work included in this plan split. 87135~|~1~|~1~|~01/STR~|~This split is for the resurfacing work on SR 309 from 0.00 to 5.59 which is outside the Lima Urbanized Area and has a rural classification. 87135~|~1~|~2~|~02/S<2~|~This split is for the resurfacing work on SR 309 from 5.59 to 5.77 which is inside the Lima Urbanized Area and has an urban classification. 120348~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4. 117946~|~1~|~1~|~01/NFP~|~Systematic guardrail repairs/replacements and maintenance on various routes throughout District 4. 112828~|~1~|~1~|~01/NHS~|~D09 Overlay FY27 87331~|~1~|~1~|~01/STR~|~7304471 SCI SR140 9.73 Intersect: Stream80 Fed/20 State. 01/STR/BR/State 99627~|~1~|~1~|~01/NHS~|~Added split for paving work at 80% federal and 20% state 106416~|~1~|~2~|~02/NHS/STRE~|~Culvert work. 106416~|~1~|~1~|~01/SAF/STRE~|~Widening of POR SR 43 to accommodate a Two Way Left Turn Lane. 118667~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 92776~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Slip repair on LIC SR13 7.76-7.83 92776~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Slip repair on LIC SR13 7.7-7.76 92113~|~1~|~1~|~01/IMS~|~resurface LUC IR 75 1.99-4.89 - Nebraska Rd to Central Ave 97372~|~1~|~1~|~01/IMS~|~Split for all interstate bridge work at 90/10. 97372~|~1~|~2~|~02/NHS~|~Split for NHS bridges at 80/20. 100328~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project. 108359~|~1~|~1~|~01/STR/SOME~|~"Jobs & Commerce" and "Appalachia Regional Council" Funding - 4JC7 (100% State) - 4D37 (100% Federal) - CAP (See Comments) - Construction of access road connecting to SR 13 at the 17.00 mile marker for patients and emergency vehicles entering the Genesis Perry County Medical Center in the Village of Somerset. 121867~|~1~|~1~|~01/NFP~|~Bridge work on various structures in District 5. 105732~|~1~|~1~|~01/MPO~|~For federally eligible items 105732~|~1~|~2~|~02/MPO~|~For 100% local items 105732~|~1~|~3~|~03/MPO~|~100% local funds for Division of Water (DOW). 81747~|~2~|~5~|~05/NHS~|~NHS funded pvmt workMainline SR-315 work, I-270 CD ramp work due to adding capactiy, retaining wall #14 81747~|~1~|~1~|~01/NHS~|~Adding capacity to 270 EB CD lanes, ramps, 315 ML workGeneral roadway items, lighting, retaining walls 1, 1A, 1C 81747~|~2~|~9~|~09/NHS~|~NHS funding for bridge rehab/no capacity (not BR eligible):SFN 2515962 FRA-315-12.20L - Wilson Run 81747~|~1~|~3~|~03/NHS~|~Bridge rehab for existing bridge:2510952 FRA IR270 22.94B Rt Ramp Over Olentangy R 81747~|~1~|~10~|~10/S>2~|~Incremental cost of fence enhancement along the bikeway to be paid by the City of Columbus recreation and Parks 81747~|~1~|~11~|~11/SAF~|~payment to contractor for damage to a tower lighting controller 81747~|~1~|~4~|~04/ENH~|~Enhancement funding for adjustments to bikepath under 270/315 ramps and along 315 81747~|~2~|~6~|~06/NHS~|~NHS funded new bridges:SFN 2511061 FRA-270-23.69ASFN 2511053 FRA-270-23.54ANew Retaining wall 12 & 13 for new bridges 81747~|~2~|~8~|~08/IMS~|~IM funding for bridge replacement without capacity (not BR eligible):SFN 2510839 FRA-315-12.15 81747~|~1~|~2~|~02/NHS~|~Retaining Wall 3 (for FRA-315-11.80 bridge) and retaining Walll 4 (for FRA-270-22.78B bridge) and construction of 4 New Bridges:SFN 2510758 FRA-270-22.65BSFN 2510871 FRA-270-22.78BSFN 2510901 FRA-270-22.93BSFN 2515857 FRA-315-11.80 81747~|~2~|~7~|~07/NHS~|~NHS funding for bridge rehab with capacity (not BR eligible):SFN 2510928 FRA-270-22.94A 96959~|~1~|~1~|~01/STR/SCI~|~SCI 73 11.93 (SFN 7302649)SCI 73 12.05 (SFN 7302673) 103930~|~1~|~1~|~01/IMS~|~Reconstruct 400' of failing slope on SB IR-271 at 8.85 and install new drainage system. 100000~|~1~|~1~|~01/IMS~|~Split for culvert work 121755~|~1~|~1~|~01/BRO/POCE~|~Superstructure replacement. 121755~|~1~|~2~|~02/S>2/POCE~|~Trail work. 96603~|~1~|~1~|~01/IMS~|~Work to replace culverts at 15.36. These culverts meet the state definition of a bridge, but not the federal definition. Funds will be from the District Preservation Program budgets SACs 4PF7 and 4PS7. 117576~|~1~|~1~|~01/NFA~|~Bridge replacement project. VIN CR 7 3.00, SFN 8230102. Funded 100% Federal. 104949~|~1~|~1~|~01/S>2~|~Plan Split for Bridge FRA-665-14.00 86657~|~1~|~1~|~01/NFA~|~Construct a trail along Austin Pike, North of the Dayton Wright Brothers Airport, and proceed northwesterly toward and thru Waldruhe Park from SR 741. The trail will procees North to the Eastern side of SR 741, connecting with and existing trail. 107814~|~1~|~1~|~01/ENH~|~Add new sidewalks along SR 91 between Conwill Rd and Fishcreek Rd in the City of Stow. 100259~|~1~|~1~|~01/MPO~|~Rehabilitate Main Avenue using MPO STP funding. 107458~|~1~|~1~|~01/NHS~|~Resurfacing of STA US 30 from 0.00 to 9.61. 97325~|~1~|~3~|~03/S<2~|~Culvert replacement project. GAL 588 10.09 (CFN 1829091). Urban other federal aid funded 80 federal/20 state. 97325~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 7 1.36, CFN 1829095. NHS route funded 80 federal/20 state. 97325~|~1~|~2~|~02/STR~|~Culvert replacement project. GAL 325 9.91(CFN 1827843), GAL 325 10.72 (CFN 1827849) and MEG 325 3.84 (CFN 1824853). Rural other federal aid funded 80 federal/20 state. 92458~|~2~|~6~|~06/S>2/PICK~|~"06/S>2/OT/PICK" - Local Funding - 4BG6/4BG7 (100% Local Funding) - CAP OPWC (4BG6) at $30,000.00 - 100% Local costs in City of Pickerington (i.e. curb ramps, etc): 1) Fai-SR 256-00.39-00.50; 2) Fai-SR 256-02.50-05.99; 92458~|~1~|~10~|~10/S>2~|~"10/S>2/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Signal Upgrade on ODOT maintained signals at the IR 70 on ramps: Fai-SR 256-00.38-00.58; 92458~|~2~|~3~|~03/S>2/PICK~|~"03/S>2/PV/PICK" - District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG6/4BG7 (20% Local Match) - CAP OPWC (4BG6) at $243,667.00 - Urban Paving in the City of Pickerington: 1) Fai-SR 256-00.39-00.50; 2) Fai-SR 256-02.50-05.99; 92458~|~2~|~5~|~05/S>2/PICK~|~"05/S>2/OT/PICK" - District Preservation Marking Pavements - 4PF7 (80% Federal) / 4BG6/4BG7 (20% Local Match) - CAP OPWC (4BG6) at $10,000.00 - Urban Paving Striping in the City of Pickerington: 1) Fai-SR 256-00.39-00.50; 2) Fai-SR 256-02.50-05.99; 92458~|~1~|~7~|~07/SAF/PICK~|~"07/SAF/OT/PICK" - Safety Program 4HJ7 (90% Federal) / LNTP (10% Local)- CAP $9212.00 Total if authorized per Agreement - On Going Consultant Services through Contract held by the City of Pickerington. 92458~|~1~|~8~|~08/SAF/PICK~|~"08/SAF/PV/PICK" - Safety Program - CAP = $1,571,607.62 (4HJ7 - 90% Federal) / $174,623.07 (4BG7-Local) - Safety project paving on Fai-SR 256 00.50-02.50 and turn lane addition. 92458~|~2~|~2~|~02/S>2/REYN~|~"02/S>2/PV/REYN" - District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local Match) - No CAP - Urban Paving in the City of Reynoldsburg: Fai-SR 256-00.00-00.39; 92458~|~2~|~4~|~04/S>2/REYN~|~"04/S>2/OT/REYN" - District Preservation Marking Pavements - 4PF7 (80% Federal) / 4BG7 (20% Local Match) - No CAP - Urban Paving Striping in the City of Reynoldsburg: Fai-SR 256-00.00-00.39; 92458~|~1~|~1~|~01/SAF/PICK~|~"01/SAF/OT/PICK" - Safety Program - CAP = $2,765,846.38 (4HJ7-90% Federal) / $307,312.93 (4BG7-10% Local) - Safety project on FAI SR 256 0.5-2.50 to upgrade signal equipment and add medians and sidewalk along SR 256 from I-70 to the Kroger/Giant Eagle signal in Pickerington. 92458~|~1~|~9~|~09/S>2/REYN~|~"09/S>2/OT/REYN" - Local Funding - 4BG7 (100% Local Match) - No CAP - Curb ramps and any other City request in the City of Reynoldsburg: Fai-SR 256-00.00-00.39; 117671~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 107492~|~1~|~1~|~01/STR~|~Resurfacing SR 183 96800~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 90934~|~1~|~1~|~01/NFA~|~Bicycle canopy, signs 114874~|~1~|~1~|~01/STR~|~Overlay in BRO 100030~|~1~|~1~|~01/IMS~|~Provide maintenance and upkeep of the existing landscaping at the I-70/I-75 Interchange in Montgomery County. 118525~|~1~|~1~|~01/S5K~|~Install sheet pile retaining wall along SR 56 118525~|~1~|~2~|~02/S50~|~100% plan split for the City of Circleville guardrail. 101338~|~1~|~1~|~01/STR~|~Bridge Rehab. 84622~|~1~|~2~|~02/S<2~|~HIG 138 (16.30-16.64)20% local match 84622~|~1~|~3~|~03/S<2~|~HIG 138 (16.64-18.26) 84622~|~1~|~4~|~04/STR~|~Bridge repair HIG 138 18.48 (3603105)HIG 138 21.07 (3603121) 84622~|~1~|~1~|~01/STR~|~HIG 138 (18.26-22.93)HIG 753 (8.04-13.10) 124496~|~1~|~1~|~01/SAF~|~Plan split for all roundabout work at SR-579 & Fostoria Rd. 92160~|~1~|~1~|~01/NFP~|~Fast Dry pavement marking for 1 year 112957~|~1~|~2~|~02/NFA~|~ROS 372 0.00-0.68 112957~|~1~|~1~|~01/NHS~|~ROS 23 0.00-1.95 107382~|~1~|~1~|~01/IMS~|~Split for paving work 109692~|~1~|~1~|~01/SAF~|~Shoulder widening using 90% Federal Safety funds (4HJ7) and 10% Local funds (LNTP). 105742~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items):LOR US 20 19.830 to 22.060 60-AC Overlay w/RpR NORTH RIDGEVILLE LOR-US-20 24.560 to 25.730 60-AC Overlay w/Rpr NORTH RIDGEVILLE: 105742~|~1~|~2~|~02/NHS~|~100% Local:Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps etc.):LOR-20-19.83 to 22.06/24.56 to 25.73 95076~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $265,000 - Rockfall Barrier Installation at LIC-IR70-21.44 98662~|~1~|~1~|~01/STR~|~Bikeway improvements. 103875~|~1~|~1~|~01/SAF~|~Safety project ROS 159 Bridge St. 104977~|~1~|~2~|~02/IMS~|~Interior Shared Use Path Barrier along bridge and associated drainage items - 100% CoC funded. 104977~|~1~|~1~|~01/IMS~|~FRA-270-6.17; Sullivant Ave over IR 270 deck replacement 76032~|~1~|~3~|~03/IMS~|~4804058 LUC IR75 7.62 Intersect: Stickney Ave. 4804171 LUC IR75 7.78 Intersect: Cecilia Ave 4804260 LUC IR75 8.07 Intersect: Ramp Nb 280 To Sb 75 4804325 LUC IR75 8.17 Intersect: I 280 Sb 76032~|~1~|~1~|~01/IMS~|~LUC IR75 6.7-8.4 76032~|~1~|~2~|~02/BRO~|~4803965 LUC IR75 7.24 Intersect: Cross Road 4804414 LUC IR75 8.49 Intersect: Chrysler Dr & Annarbor Rr 76032~|~1~|~4~|~04/IMS~|~Detour thru I-280 114952~|~1~|~1~|~01/NHS/FAIR~|~Resurfacing, urban paving in the city of Fairlawn. 114952~|~1~|~2~|~02/NHS/FAIR~|~Full and partial depth repairs and ADA curb ramps. 101577~|~1~|~1~|~01/S>2~|~Rehabilitation of the existing pavement surface including full depth pavement repair of failed areas, reconstruction of storm inlets, pavement milling and resurfacing with 1-3/4? of asphalt intermediate course and 1-1/4? of asphalt surface course, and application of new pavement markings. Sharon Road from Crowne Point Drive to Mosteller Road. 123908~|~1~|~1~|~01/ENH~|~Sidewalk improvements and associated items utilizing OMEGA funding up to associated cap. 123908~|~1~|~2~|~02/NFA~|~Paving and drainage work items utilizing OPWC funding up to associated cap. 117722~|~1~|~2~|~02/S>2~|~Asphalt Concrete Overlay with RepairsMED-162-26.740 to 26.751 117722~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with RepairsLOR-162-0.00 to 8.743MED-162-24.168 to 26.740 92667~|~1~|~1~|~01/MPO~|~Plan Split for MPO STP Funds 108644~|~1~|~2~|~02/MPO~|~For work not eligible for urban paving funds. 80% federal MPO-STP funds with a 20% local match provided by the City of Delphos. Funds needed after the cap is reached to be provided by the City of Delphos. 108644~|~1~|~3~|~03/ENH~|~Construct sidewalk on the east side of South Main Street and a shared use path on the west side from Suthoff Street to the mainline railroad tracks. Construct ADA compliant curb ramps and street lighting. Include sidewalks on the Cleveland Avenue and Suthoff Street sections as well. Federal funds from the Transportation Alternatives Program (TAP) with the non-federal funds in the match provided by the City of Delphos. After the TAP cap is reached MPO-STP funds can be used if available then 100% local funds will be used. 108644~|~1~|~4~|~04/NFP~|~100% local items 108644~|~1~|~1~|~01/S5K~|~This is for the portion of the project eligible for urban paving. 80% federal funds from the District Preservation Program budget with the 20% provided by the City of Delphos. 123842~|~1~|~1~|~01/STR~|~geotech plan split. 102955~|~1~|~2~|~02/IMS~|~Bridge Work :Fence installation/repair (062)Deck Sealing (051)Bridge railing upgrade/repair (061)131 - Deck Patching - Concrete 102955~|~1~|~1~|~01/STR~|~AC Overlay with repairs RIC SR 39 21.944 to 22.822 RIC-SR-39 21.844 to 21.944, RIC-SR-39 20.158 to 21.844RIC-SR-39 22.822 to 27.368 95551~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on COL-7; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, pavement marking. 106630~|~1~|~1~|~01/NFA~|~The City will reconstruct 700 feet of the two lane East 59th Street between Chester Ave and Euclid Ave. 101882~|~1~|~1~|~01/BRF~|~SFN 4734653, Ohio Bridge Partnership Program, Crook St over East Branch of Black River 96225~|~1~|~1~|~01/BRO~|~SFN 8706840 bridge over the Maumee River. 96225~|~1~|~2~|~02/STR~|~SR-295 pavement in WOO and LUC. 122983~|~1~|~1~|~01/STR~|~Bridge plan split. 90569~|~1~|~1~|~01/STR~|~Districtwide pavement marking plan for long line FY13 markings. 116601~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing work and related items on FRA-70. 87699~|~1~|~1~|~01/NHS~|~District Allocation 91323~|~1~|~2~|~02/NFA~|~Bridge off Federal system deck overlay over Mud Run. 100% state. 91323~|~1~|~1~|~01/NFP~|~General system resurfacing oF SR-100 from SR-309 to Crawford County line 119029~|~1~|~1~|~01/NHS~|~NHS plan split for structure replacement of FRA-710-3.70. 119029~|~1~|~2~|~02/S>2~|~Plan split for structure replacement of FRA-605-2.603 & FRA-710-2.059. 119029~|~1~|~3~|~03/STR~|~Rural plan split for structure replacement of MRW-95-3.148. 100579~|~1~|~1~|~01/STR~|~Crack sealing on various routes in District 11 116871~|~1~|~1~|~01/S>2~|~Resurfacing 97456~|~1~|~1~|~01/IMS~|~An emergency reapir of a slip along I-77. 104060~|~1~|~1~|~01/STR~|~Landslide repairs at 2 locations. 92936~|~1~|~3~|~03/STR~|~For work on a structure at 24.93 in Allen County that meets the state definition of a bridge but not the federal definition. Federal and State funds from the District Preservation Program budget SACs 4PF7 and 4PS7. Rural STP funds. Not elibible for bridge funds. 92936~|~1~|~2~|~02/NHS~|~For work on a structure at 16.76 in Allen County that meets the state definition of a bridge but not the federal definition. Federal and State funds from the District Preservation Program budget SACs 4PF7 and 4PS7. NHS funds. Not eligible for bridge funds. 92936~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7. 113281~|~1~|~1~|~01/STR~|~Culvert Replacements. 116755~|~1~|~1~|~01/IMS~|~Culvert replacement plan split for DEL-71-9.824 119656~|~1~|~1~|~01/BRO~|~Replacement of culverts located RIC SR 0314 00.83 & 01.66. 96699~|~1~|~1~|~01/NFP~|~MAH SR 11 SB shared 3,000 ton Salt Building with Fence. 120811~|~1~|~1~|~01/STR~|~Traffic Signal and Highway Lighting Maintenance. 88944~|~1~|~1~|~01/BRO~|~Replace existing boxbeam bridge (JEF-150-1098, SFN 4102347) with new structure. The bridge carries SR 150 over Short Creek. 124914~|~1~|~1~|~01/S5K~|~Culvert replacement COL-14-4.51. 124914~|~1~|~2~|~02/STR~|~Culvert replacement COL-62-4.23. 124357~|~1~|~1~|~01/SAE~|~Roundabout 108090~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridge. 21810~|~1~|~1~|~01/IMS~|~90/10 funding split with federal IM funds. 20617~|~1~|~1~|~01/STR~|~Brdg replacement. 2.45 miles west of SR378 4403517 LAW SR243 9.45 Intersect: Leatherwood Creek80 Fed/20 State. 01/STR/BR/State 111988~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2025. Funded 100% State. 123666~|~1~|~1~|~01/NHS~|~plan split for bridge work on the WAR-42 bridges 101015~|~1~|~1~|~01/IMS~|~Repair fascia beam and stiffeners from damage caused by vehicle strike accident. 101675~|~1~|~1~|~01/NFA~|~Mowing D9 4 lanes 116845~|~1~|~1~|~01/ENH~|~Adding new sidewalks in Kinsman Township. 110629~|~1~|~1~|~01/STR~|~Resurfacing. 110629~|~1~|~2~|~02/STR~|~Bridge work > 20' span. 110629~|~1~|~3~|~03/STR~|~Bridge work 10' to 20' span. 25617~|~1~|~1~|~01/IMS~|~Split for all bridge work in the interstate system. 111523~|~1~|~2~|~02/ENH~|~Plan Split for 100% LPA-funded lighting 111523~|~1~|~1~|~01/MPO~|~MPO funded items 88927~|~1~|~1~|~01/BRO~|~Remove bridge carrying SR 800 over an abandoned rail road bed. 92973~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Kno-US 36-00.00 to 10.71; 2) Kno-SR 314-00.00 to 02.73; 95632~|~1~|~1~|~01/ENH~|~Enhance the transit, pedestrian and bicycle facilities along Cedar Road and Lee Road in Cleveland Heights using 80% federal (MPO Enhancement) with 20% local matching funds. 95632~|~1~|~2~|~02/NFP~|~Cuyahoga County and Cleveland Hts will participate in the improvement to resurface Lee Road from Dellwood Rd to Superior Ave. Work will also include the upgrade of signs and signals. 90633~|~1~|~1~|~01/NFP~|~This is a guardrail contract using maintenance operating funds (4CP7). 116457~|~1~|~1~|~01/ENH~|~Adding sidewalks on Springside Dr from SR 18 to Cleveland Massillon Rd 101117~|~1~|~1~|~01/STR~|~DSR# BEL-007 113647~|~1~|~7~|~07/IMS~|~Created for J&C Involvement 113647~|~1~|~2~|~02/IMS~|~This plan split will cover all bridge work needed to construct a new overpass of Millikin over I-75 with the new interchange 113647~|~1~|~1~|~01/IMS~|~This plan split will cover all pavement and roadway work associated with the construction of the new interchange ramps 113647~|~1~|~3~|~03/S>2~|~This plan split is for all work associated with the widening and reconstruction of Millikin Rd from and including the roundabouts at Cincinnati Dayton Rd and Butler Warren Rd. 113647~|~1~|~4~|~04/S>2~|~This plan split is for work along Cincinnati Dayton Rd, Butler Warren Rd, and the west leg of Millikin Rd as tie ins to the roundabouts at those intersections. 113647~|~1~|~5~|~05/NFA~|~This plan split is for the work along Brewer Rd to tie into the roundabout. 113647~|~1~|~6~|~06/IMS~|~This plan split is for 100% local funding for the landscaping for the new interchange. 91593~|~1~|~2~|~02/NFP~|~Signal improvements at SR-25 & Newton intersection 91593~|~1~|~1~|~01/SAE~|~Upgrade signals on SR-64 in Bowling Green. 82967~|~1~|~1~|~01/IMS~|~Preventative maintenance on the Priority system in FY2015. Routes to be determined. 88946~|~1~|~1~|~01/BRO~|~Redeck of SFN 0402494, ATB SR45 14.84 OVER MILL CREEK, Ashtabula County, Ohio. 88946~|~1~|~2~|~02/STR~|~Replacement of SFN 0403210, ATB SR84 7.97 over Indian Creek, Ashtabula County, Ohio. 112238~|~1~|~1~|~01/NFP~|~Mowing at various locations in Franklin County 117877~|~1~|~1~|~01/NHS~|~Plan split for Urban Paving work on Telegraph Rd / US-24 (NHS) 117877~|~1~|~2~|~02/NHS~|~Plan Split for 100% locally funded pavement repairs, curbs, ramps, etc. 117877~|~1~|~3~|~03/SAF~|~Safety funding for intersection improvement and shared use path. 103437~|~1~|~1~|~01/NHS~|~Pavement split 86001~|~1~|~1~|~01/S>2~|~Federal/State paving on FRA-62: 25.91-25.94, 26.25-26.26, 26.32-26.40, 26.51-26.85 86001~|~1~|~2~|~02/S>2/Gah~|~Federal/Local paving in Gahanna on FRA-62-23.83-25.91, 25.94-26.25, 26.26-26.32, 26.40-26.51, 26.85-26.86, 86001~|~1~|~3~|~03/S>2/Gah~|~100% City of Gahanna items for sidewalks, pavement repair, etc 86001~|~1~|~4~|~04/NHS/Gah~|~Paving FRA-62-22.60 to 23.07 and 23.66 to 23.83 (Fed/Local) 106144~|~1~|~1~|~01/SAF~|~Guardrail upgrade/repair in District 8 106144~|~1~|~2~|~02/SAF~|~Guardrail upgrade/repair in Montgomery County in D7. 105653~|~1~|~4~|~04/NFA~|~Repair or replace guardrail sections and/or posts on a Minor Collector that is not on the federal aid system. This is for work on SR 231 in Wyandot County at 10.85, 13.81 and 17.30. Funding is from the District Preservation Program. 105653~|~1~|~3~|~03/S<2~|~Repair or replace guardrail sections and/or posts on the urban STP system. This is the work on SR 111 in Defiance County and on SR 199 in Wyandot County at 6.93. Funding is from the District Preservation Program. 105653~|~1~|~2~|~02/STR~|~Repair or replace guardrail sections and/or posts as needed on the rural STP system. This includes all locations on US 127 and SR 281 in Defiance County and all locations on SR 53, SR 67 and SR 103 in Wyandot County as well as the work at 3.83, 9.47 and 22.99 on SR 231 in Wyandot County and 1.3, 8.85 and 10.07 in Wyandot County. Funding is from the District Preservation Program. 105653~|~1~|~1~|~01/NHS~|~Repair or replace guardrail sections and/or posts as needed on the NHS. This includes all locations on US 30 in Van Wert County and all locations on US 23 in Wyandot County. Funding is from the District Preservation Program. 104101~|~1~|~1~|~01/STR~|~Plan split for bridge replacement 121505~|~1~|~1~|~01/SAF~|~Signal & lighting maintenance 121533~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance. 121533~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance. 121533~|~1~|~3~|~03/NFP~|~Bridge hit repairs via change order. 91810~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6003842 MUS SR83 1.38 Intersect: Csx Rr N. Crooked Crk #; BR Eligible for Rehabilitation: Length=291 SD/FO(1) SR=76.5 DSR=4 118202~|~1~|~1~|~01/SAF~|~Plan split for Safety funds 87715~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 16319~|~1~|~2~|~02/MPO~|~100% Local items. 16319~|~1~|~3~|~03/SAF~|~Added plan split for 90/10 Safety items. 16319~|~1~|~1~|~01/MPO~|~Major reconstruction 124552~|~1~|~1~|~01/NHS~|~KY Share (73%) of total cost of bridge rehab project 124552~|~2~|~2~|~02/NHS~|~OH Share (27%) of KY bridge rehab project. 87935~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of SR 310 south of the Limited Access area: Lic-SR 310-00.74 to 00.86 87935~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP. Replacement of SR 310 north of the Limited Access area Lic-SR 310-01.19 to 01.44 87935~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation/MORPC 4PF7/4TA7 (80% Federal) / 4PS7(20% State) - CAP on MORPC (4TA7) Funding $2,650,000.00 for Bridge Construction - Rehabilitation on SFN 4505646 LIC SR310 0.96 Intersect: Sr 310 Over Ir70; BR Eligible for Rehabilitation: Length=284 SD/FO(1) SR=77.3 DSR=4 87935~|~1~|~5~|~05/NHS~|~"05/NHS/CV/ " - District Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP. Replacement of deficient culvert at Lic- SR 310-01.34; 87935~|~2~|~8~|~08/STR~|~"08/STR/PV/ " - District Preservation 4PF7 (80% Federal)/4PS7 (20% State) - No CAP -Resurfacing of 1)Fai-SR 310-0.00 to 0.52 and 2)Lic-SR 310-0.00 to 0.96 87935~|~2~|~9~|~09/NHS~|~"09/NHS/PV/ " - District Preservation 4PF7 (80% Federal)/4PS7 (20% State) - No CAP - Reurfacing of Lic-310-(0.96 to1.71) 87935~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation/MORPC Funding 4PF7 / 4TA7/MR06 (80% Federal) / 4PS7 (20% State) - CAP MORPC $4,022,112.25 Federal Funding. Replacement of: 1) Ramp RA-45006; 2) Ramp RA-45003; 3) Ramp RA-45004; 4) Ramp RA-45007; and widening of SR 310 within the Limited Access area: 5) Lic-SR 310-0.86 to 01.19; 87935~|~1~|~6~|~06/IMS/ETNA~|~"06/IMS/OT/ETNA" - Local Funding MORPC 4TA7/MR06 (80% Federal) / Etna 4BG7 (20% Local) - CAP of MORPC Federal Funds $472,783.75. Township Name and Lighting Aestects on the SR 310 bridge over IR 70. 87935~|~1~|~7~|~07/NHS/SWLC~|~"07/NHS/OT/SWLC" - South West Licking County Water & Sewer Funded - 4BG7 (100% Local) - No CAP - Installation of South West Licking County Water & Sewer lines 11455~|~1~|~1~|~01/STR~|~8602646 WIL SR191 5.34 Intersect: Tiffin River 103272~|~1~|~1~|~01/IMS~|~Truck Parking Information Management System along IR 70/75/71 -Us 33 103272~|~1~|~2~|~02/IMS~|~Plan split for Operations and Maintenance. 103272~|~1~|~3~|~03/IMS~|~TPIMS additional set of rest areas on IR 70 in Belmont County. 111402~|~1~|~1~|~01/STR~|~Culvert liner project on HOC 56 17.47, CFN 1824547. Rural other federal aid funded 80 Federal/20 State. 99601~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 112661~|~1~|~1~|~01/MPO/NILE~|~Resurfacing. 25025~|~1~|~1~|~01/S<2~|~Resurface the existing roadway and other roadway related items Celina on SR 197 0.26 to 1.59 from the junction of US 127 to the Celina Corporation Limit 101965~|~1~|~1~|~01/STR~|~Apply herbicides along the roadside for weed control on 4 lanes. 93114~|~1~|~1~|~01/STR~|~District Allocation 120506~|~1~|~1~|~01/STR~|~Bridge replacement 114533~|~1~|~1~|~01/NFP~|~D09 Deck Sealing Project FY2027 106090~|~1~|~2~|~02/NHS~|~NHS Plan Split: DEL-37-10.48-11.45 106090~|~1~|~3~|~03/S>2~|~100% City of Delaware items 106090~|~1~|~4~|~04/NHS~|~Drainage repair on US 23 and repair at SR 37/Section Line Rd to be paid 100% by the state 106090~|~1~|~1~|~01/S>2/COD~|~Urban Paving Plan Split: DEL-37-9.07-10.48 112108~|~1~|~1~|~01/NFP~|~Electrical maintenance contract 105549~|~1~|~1~|~01/NHS~|~Double Application Microsurfacing 105549~|~1~|~2~|~02/IMS~|~Interstate Plan Split: MRW-71-0.00-12.20 81700~|~1~|~1~|~01/BRO~|~Replace existing structure (HOL-62-1738, SFN 3801357) with a new four-sided precast concrete box. 109723~|~1~|~1~|~01/NHS~|~Resurface the existing roadway with Fine Polymer Asphalt (Smoothseal) ? (1.00?) 109723~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 100306~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to MAH SR 46 14.67 to 16.87 100306~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to MAH SR 46 12.04 to 14.67. 100306~|~1~|~3~|~03/STR~|~Fine graded polymer AC Overlay to MAH SR 45 11.77 to 14.15. 105580~|~1~|~1~|~01/STR~|~All work in this project. 108818~|~1~|~1~|~01/NFP~|~Replacing the linked culverts. 107971~|~1~|~1~|~01/S<2~|~Perform concrete pavement repairs at the ramp CLA SR 41 SLM 12.17 to 12.37 107971~|~1~|~2~|~02/STR~|~Repair settlement and pavement approaches to BR # CLA-54-0567. 93113~|~1~|~6~|~06/IMS~|~Bridge WorkMED-57-3.24 (over I-76) / MED-57-9.00 (over I-71) / MED-94-14.55 (over I-271) 93113~|~1~|~5~|~05/STR~|~Bridge WorkMED-51-5.21 / MED-57-5.72 / MED-57-6.51 / MED-94-11.38 / MED-94-11.91 / MED-94-12.22 / MED-94-13.14 93113~|~1~|~2~|~02/S<2~|~District Allocation - Urbanized Area 93113~|~1~|~1~|~01/STR~|~District Allocation 93113~|~1~|~3~|~03/S<2/WADS~|~Federal (4PF7) / City (4BG7) - Wadsworth split corp MED-057-3.24 - 03.44 / MED-057-03.58 - 03.84 93113~|~1~|~4~|~04/S<2/WADS~|~100% City of Wadsworth 121871~|~1~|~1~|~01/S5K~|~REHAB OF CONDUIT 99456~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall. 114736~|~1~|~1~|~01/SAF~|~Intersection improvements at MAH SR 7 and Brookwood Rd. 114736~|~1~|~2~|~02/S>2~|~Culvert work. 110512~|~1~|~1~|~01/BRO~|~Bridge Funding Plan Split - Woo-75-28.78 119095~|~1~|~1~|~01/NFA~|~VIN-50-0.00-10.68 Resurfacing 95439~|~1~|~1~|~01/NFA~|~Perrysville Outpost - Salt and Storage Buildings - Facilities Funds 105261~|~1~|~1~|~01/NFA~|~Resurfacing of CAR-524 and JEF-524 105261~|~1~|~2~|~02/STR~|~Resurfacing COL-45 from SLM 0.89 to 8.95 109709~|~1~|~1~|~01/STR~|~Ac overlay 109709~|~1~|~2~|~02/IMS~|~AC overlay with repairs. 98592~|~1~|~1~|~01/SAF~|~Intersection improvement/signal upgrade project. VIN 50 17.44-17.47 and VIN 93 8.05-8.16. Work includes new signal, left turn lanes, radii improvement and changes to parking. Funded 90 federal/10 state. 103279~|~1~|~1~|~01/S>2~|~Replace failed retaining wall along US 50. 92907~|~1~|~1~|~01/IMS~|~8703183 WOO IR75 6.01 Intersect: Tr 23-Jerry City Road 8703213 WOO IR75 6.01 Intersect: Tr 23-Jerry City Road 105498~|~1~|~1~|~01/IMS~|~Deck replacement for Gantz Rd over IR 270 (existing width 62%) and McComb Rd over IR 270 (full width) including 100% of guardrail to Charlemagne St. 105498~|~1~|~3~|~03/IMS/GrC~|~Construct shared use path along Gantz Rd from Home Rd to the bridge. 105498~|~1~|~2~|~02/IMS/Cols~|~Widen Gantz Rd bridge to accomodate a shared use path (widened width 38%) 105498~|~1~|~4~|~04/S>2/Cols~|~Grade the shoulder slopes along McComb Rd. to accommodate a future sidewalk from the bridge to Charlemangne St. Construct shared use path along Gantz Rd from the bridge to Collier Crest. Widen and resurface McComb Rd. from Home Rd to the bridge. All funded 100% by Columbus 94113~|~1~|~1~|~01/BRF~|~Replace deficient bridge carrying Fairfax Avenue over Lilly Creek with minimal approach work (single span, SFN $5770696 (0.2 miles South of Springfield Street. 122138~|~1~|~1~|~01/NFP/BARB~|~Install new sidewalks in gap locations. 118710~|~1~|~1~|~01/IMS~|~Plan split for work to rehab bridge HAM-71-0091. 120357~|~1~|~1~|~01/NFP~|~Systematic sign upgrades/replacements on various routes throughout District 4. 87973~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of: 1) 3005194 GUE SR285 4.56 Intersect: Over Infirmary Run; Not BR Eligible for Rehabilitation: Length=86 SD/FO(0) SR=75.7 DSR=5: 87973~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of: 1) 3005070 GUE SR285 0.15 Intersect: Over Seneca Fork Wills Ck; BR Eligible for Rehabilitation: Length=133 SD/FO(1) SR=65.2 DSR=4; 90222~|~1~|~2~|~02/BRO~|~80/20 fed/state funding split using federal BRF funds for structure 2802317; GEA-608-1053. 90222~|~1~|~1~|~01/STR~|~80/20 fed/state funding split using federal STP funds for structure 2800993; GEA-088-0496. 116717~|~1~|~1~|~01/STR~|~Culvert Liner Project WAS 339 7.32 CFN: 1809792 119822~|~1~|~1~|~01/NHS~|~Construct sidewalks 119822~|~2~|~2~|~02/NHS~|~Decorative Lighting 116695~|~1~|~1~|~01/NHS~|~NHS Plan Split 116695~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split 108071~|~1~|~1~|~01/IMS~|~All items associated with pavement repairs on I-70 and US-42. 119958~|~1~|~1~|~01/CMQ~|~Widen Beaver Valley Road from Dayton-Xenia to Hazel Drive. also includes curb, storm sewer, lowering portion of roadway and installation of sidewalk. 119934~|~1~|~1~|~01/SAF~|~Safety Items 84576~|~1~|~4~|~04/NHS~|~Rehabiltate bridge size culvert CLE-52-0956 (10' CIP box culvert): SFN 1301683 and intersect: Opossum Hollow. Work to be performed: slope protection, sealing, & scour prev. & repair 84576~|~1~|~1~|~01/NHS~|~Rehabiltate bridge size culvert CLE-52-0921 (108" CIP box culvert). 84576~|~1~|~3~|~03/NHS~|~Rehabilitate bridge CLE-52-1336 (30' boxbeam). SFN: 1301802 and intersect: Ray Run. Work to be perfomed includes: slope protection, concrete patching, sealing, & scour prev. & repair. 84576~|~1~|~2~|~02/STR~|~Rehabilitate Bridge CLE-232-0048 (120" CMP). SFN 1304356 and intersect: Dry Run. Work to be performed: drainage system cleaned, scour prevent/correction, channel clean out, slope repair, & invert repair 84518~|~1~|~3~|~03/S<2~|~District Allocation - Roadway Items plus structuresASD-042-09.02 sfn:0301299 84518~|~1~|~4~|~04/NHS~|~Resurfacing - 80/20 - District Allocation/City of Ashland 84518~|~1~|~2~|~02/NHS~|~District Allocation - Roadway Items plus structuresASD-042-05.93 sfn:0301108ASD-042-06.53 sfn:0301140ASD-042-07.76 sfn:0301183ASD-042-07.91 sfn:0301205ASD-042-08.89 sfn:0301280 84518~|~1~|~7~|~07/S<2~|~Bridge Work ASD-042-09.39 sfn:0301329 84518~|~1~|~5~|~05/S<2~|~Resurfacing - 80/20 - District Allocation/City of Ashland 84518~|~1~|~6~|~06/NHS~|~Bridge Work ASD-042-08.45 sfn:0301264 84518~|~1~|~1~|~01/S<2~|~100% City of Ashland 95384~|~1~|~1~|~01/BRF~|~Preservation of a historic bridge relocated from TR-150 nder PID 90412 to the Hueston Woods State Park. Rehabilitation includes additional steel work at the gussets, vertical members, and lower chord, application of a new protective coating system, installation at new location on new concrete abutments with new stringers and a timber deck. 86288~|~1~|~2~|~02/NHS~|~Pavement planing and resurfacing with asphalt concrete, along with other roadway related items on DAR SR 49 SLM 17.35 to 17.64. 86288~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete along with other roadway related items on DAR SR 118 SLM 0.56 to 1.90. 115856~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2029. 121160~|~1~|~1~|~01/NFA~|~Created Plan Split for J&C Involvement. 97851~|~1~|~3~|~03/BRF~|~Replace MRW-TR 110-1.52 (Cardington Williamsport Rd) structure over Kokosing River SFN5932548 97851~|~1~|~1~|~01/BRF~|~Replace MRW-CR 109-0.86 (Pulaskiville Rd) structure over Kokosing River SFN 5932769. 97851~|~1~|~4~|~04/BRF~|~Replace MRW-TR 121-2.39 (Center Corners-Fredericktown Rd) structure over Kokosing River SFN 5931290 97851~|~1~|~2~|~02/BRF~|~Replace MRW-CR 20-2.40 (Williamsport-Bloomingrove Rd) structure over Kokosing River SFN 5933005 89095~|~1~|~1~|~01/BRO/MCEO~|~"01/BR0/BR/MCEO" - County Engineer's Association Organization (CEAO) Bridge Funding 4B87 (80% Federal) / 4BG7 (20% Local Match) - CAP 4B87 = $3,552,800 minus $1,000,000 for RW = $2,552,800.00 / 4BG7 - $410,000.00 - Replacement of Deficient Bridge Mus-SR 555-10.19 carrying SR 555 over Jonathan Creek. BR Eligible for replacement; L=222?; SD/FO = (1); SR = 3.0; DSR=7 89095~|~1~|~2~|~02/S<2/MCEO~|~"02/S<2/PV/ " - County Engineer's Association Organization (CEAO) Bridge Funding 4B87 (80% Federal) / 4PS7 (20% State Match) - CAP Remaining from Plan Split 1 4B87 = $3,552,800 minus $1,000,000 for RW = $2,552,800.00 - Realignment of SR 555 to align with new bridge; Mus-SR 555-10.19 to 10.45 124717~|~1~|~1~|~01/NFA~|~Bridge rehab project on GAL TR 420 0.00, SFN 2742330. 108723~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-033 94563~|~1~|~1~|~01/IMS~|~90% federal / 10% state funding split using noise wall funding. 94563~|~1~|~2~|~02/NFP~|~100% state funding for 48" culvert purchase. 102452~|~1~|~1~|~01/STR~|~Herbicidal Spraying for CAR, COL, HOL and TUS 114261~|~1~|~1~|~01/MPO/HAM~|~Construct a 10-foot wide multi-use path along the backside of the Great Miami River levee between Main Street and Black Street. Route generally follows the abandoned Hamilton Beltline rail corridor and is approximately 0.65 miles in length. 107171~|~1~|~1~|~01/STR~|~Rural Plan split 107171~|~1~|~2~|~02/S<2~|~Added Urban Plan Split 121522~|~1~|~1~|~01/IMS~|~landslide repair along the ramp from Mitchell to HAM-75 103196~|~1~|~1~|~01/IMS~|~Split for work on the interstate system 103196~|~1~|~2~|~02/NHS~|~Plan split for work on NHS routes 103196~|~1~|~3~|~03/S>2~|~Plan split for work on urban STP routes 103196~|~1~|~4~|~04/STR~|~Plan split for work on the rural STP routes 100379~|~1~|~1~|~01/STR~|~All work is in this Plan Split. All funds are from the District Preservation Program budget. No local funds. 80% federal SAC 4PF7 and 20% state funds SAC 4PS7. Federal funds are rural STP. 119258~|~1~|~1~|~01/S5K~|~All items of work associated with resurfacing of SR 188 119258~|~1~|~2~|~02/NHS~|~All items of work associated with resurfacing of US 35 117124~|~1~|~1~|~01/IMS~|~Landslide repair along southbound HAM-75 near SLM 5.53 102807~|~1~|~1~|~01/NHS~|~For work on US 24 which is on the NHS. All funds from the District Preservation Program budget. Federal SAC 4PS7 and State SAC 4PS7. No local funds. 95520~|~1~|~2~|~02/NFA~|~Reapir/replace existing culvert DAR 705 1.77 95520~|~1~|~1~|~01/STR~|~Repair/replace existing culverts at DAR 705 8.50, DAR 705 13.90, MER 49 1.71, MER 49 10.26 and SHE 705 0.72 106262~|~1~|~1~|~01/S<2/COC~|~Urban Paving Plan Split: PIC-22-18.26-18.88 PIC-56-19.57-20.66 106262~|~1~|~3~|~03/S5K~|~This plan split is associated with 100% CIty of Circleville cost items - such as pavement repairs. 106262~|~1~|~2~|~02/STR~|~Rural plan split for the geotech work and pavement rebuild (SLM 15.47 to 15.51) 103012~|~1~|~1~|~01/IMS~|~Installing 0.2 mile markers on ATB IR90. 97781~|~1~|~1~|~01/NFP~|~100% State Task Order Construction Porject Inspection 103735~|~1~|~1~|~01/NFA~|~Safe Routes to School 113808~|~1~|~1~|~01/BRF~|~Replacement of SFN 3946088 93299~|~1~|~1~|~01/S<2~|~General system paving and in urban func class areaPIC-188: 1.44-1.68, 2.57-2.90 93299~|~1~|~3~|~03/STR~|~General system paving and in rural func class areaPCI-188: 2.90-8.03 93299~|~1~|~2~|~02/S<2~|~Circleville urban paving and in urban func class areaPIC-188: 1.68-2.57 79390~|~1~|~1~|~01/NHS~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the NHS portion on SR 4 between SLM 22.34-23.23 (Nelbar - North Corp.). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. 79390~|~1~|~4~|~04/S<2~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the STP<200000 area on SR 122D between SLM 1.4-1.85 (Tytus Ave. - Carmody). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 79390~|~1~|~3~|~03/S<2~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the STP<200000 area on SR 122D between SLM 1.4-1.85 (Tytus Ave. - Carmody). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. 79390~|~1~|~2~|~02/NHS~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the NHS portion on SR 4 between SLM 22.34-23.23 (Nelbar - North Corp.). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 115842~|~1~|~1~|~01/STR~|~Culvert replacement project. 123496~|~1~|~1~|~01/STR~|~Resurfacing project using a fine graded polymer treatment. 123496~|~1~|~2~|~02/S5K~|~Resurfacing project using a fine graded polymer treatment. 100049~|~1~|~1~|~01/STR~|~Realignment of SR 43 in the Village of Amsterdam 100049~|~1~|~2~|~02/STR~|~This plan split is for the construction of new sidewalks. 118426~|~1~|~1~|~01/S5K~|~Erosion/slide repairs. 105506~|~1~|~3~|~03/S>2~|~!00% City of Columbus items 105506~|~1~|~2~|~02/S>2~|~Urban Paving in the City of Columbus (FRA-62-8.53-8.82, 9.06-9.07, 9.15-9.22, 10.11-10.22, 10.62-10.77) 105506~|~1~|~1~|~01/S>2~|~General system outside the City of Columbus: FRA-62-8.82-9.06, 9.07-9.15, 9.22-10.11, 10.22-10.62, 10.77 to 10.80 97886~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 26 1.65. Type A Emergency project. Funded 100% state. 119482~|~1~|~1~|~01/BRF~|~Off System Eligible bridge replacement utilizing CEAO LBR funds at 100% up to CAP. 123909~|~1~|~1~|~01/CMQ~|~Widening of Kemp Road from I-675 to Grange Hall Road to add a two-way left turn lane. Addition of sidewalk to both sides of Kemp Road. Minor horizontal and vertical profile improvements. 116911~|~1~|~1~|~01/SAF~|~District-Wide polyester pavement markers 116911~|~1~|~2~|~02/SAF~|~District-Wide polyester pavement markers 121586~|~1~|~1~|~01/STR~|~Culvert Replacement. 121586~|~1~|~2~|~02/STR~|~Culvert Replacement 106553~|~1~|~2~|~02/NHS~|~Removal of structure on ATH US 33 14.63, SFN 0500887. 106553~|~1~|~1~|~01/NHS~|~Resurfacing project on ATH US 33 14.00-16.00. Includes concrete repair and asphalt resurfacing on mainline. Most of the work will focus on asphalt resurfacing of the ramps at that location. Funding is 100% State on NHS. 103278~|~1~|~1~|~01/NFP~|~Replacing signs on various 2 lane routes in ATB County. 121118~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing. 119883~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-B 116580~|~1~|~1~|~01/S5K~|~Reconstruction of 5th Street. 94792~|~1~|~1~|~01/NFA~|~Construct 2 missing trail links on the existing 96 mile trail from Cincinnati to Urbana. 98908~|~1~|~1~|~01/NFP~|~TID funded project for culvert replacements, grading of berms and ditches, and resurfacing of ATH CR 53. Agreement number 18595. Funded 100% state TID. 93984~|~1~|~1~|~01/NFA~|~Brdg Replacement It is proposed, on CR 13, Franklin Valley Road, to replace the structure, SFN 4030613 (1.47). 80% Fed/20 % local match 01/FNA/BR/Jackson 84167~|~1~|~3~|~03/NFA~|~Bridge painting project. MOE 379 0174 (SFN 5602734) and NOB 724 0189 (SFN 6105076). Not on an federal aid system funded 80 federal/20 state. 84167~|~1~|~1~|~01/STR~|~Bridge painting project. MOE 800 1532 (SFN 5603242). Rural other federal aid funded 80 federal/20 state. 84167~|~1~|~2~|~02/NHS~|~Bridge painting project. WAS 7 4462 (SFN 8400547) and WAS 7 5280 (SFN 8400660). NHS route funded 80 federal/20 state. 104661~|~1~|~1~|~01/STR~|~Replacing linked structures 10' to 20' span. 104661~|~1~|~2~|~02/STR~|~Deck overlay and minor work to linked structure > 20' span. 113166~|~1~|~1~|~01/STR~|~Landslide repair project WAS 821 13.28. 108465~|~1~|~1~|~01/SAF~|~Plan split for ALL work related to the intersection at SR 2 and Byrne Rd. 108465~|~2~|~2~|~02/SAF~|~Plan split for ALL work related to the intersection at SR 2 & McCord Rd. 100046~|~1~|~1~|~01/CMQ~|~Construction of a 10' wide multi-use trail from the Evans Recreation Area to State Street. 100046~|~2~|~2~|~02/CMQ~|~Construction of a 10" shared use path from Fairbanks Avenue (near Boldface Park) to the Gilday Riverside Playfield. 109681~|~1~|~1~|~01/STR~|~Resurfacing SR 43 111315~|~1~|~1~|~01/NFP~|~Nagel Rd Widening Project. 97404~|~1~|~2~|~02/NFA~|~Replace SFN 6734464 POR-TR 280-0.47 Norton Rd over Silver Creek. 97404~|~1~|~1~|~01/NFA~|~Replace SFN 6760023 POR-MR 277-0.04 Allen Drive over Fish Creek (City of Kent) 97404~|~1~|~3~|~03/NFA~|~Relpace SFN 6730558 POR-TR 240-0.24 Canada Road over Trib of Cuyahoga River. 96052~|~1~|~1~|~01/CMQ~|~This project is for the establishment of a Park & Ride parking lot in Belmont County off of CR 102 near the interchange of IR-70 and SR 800. Inlcudes drainage, curb, lighting, and fence. 116348~|~1~|~1~|~01/STR~|~conduits linked 110399~|~1~|~1~|~01/S>2~|~construction of bike path eligible for federal-aid 84877~|~1~|~1~|~01/BRF/PCEO~|~County Engineers Association Local Bridge Program Funding -4B87 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Perry County replacing deficient bridge, SFN 6430473 (Per-CR 18-00.90) carrying CR 18 over a stream 123235~|~1~|~1~|~01/S5K~|~Resurfacing 100618~|~1~|~1~|~01/STR~|~Microsurfacing of HOL-62 from SLM 9.88 to 14.18 and HOL-83 from Holmesville NCL to Wayne County, including pavement repairs and pavement mearkings. 106274~|~1~|~5~|~05/NHS~|~Bridge sealing for SFN 2502712. 106274~|~1~|~6~|~06/NHS/COB~|~City of Bexley Urban Paving NHS Plan Split: FRA-40-15.30-15.71 106274~|~1~|~1~|~01/S<2/COB~|~Bexley Urban Paving Plan Split: FRA-40-16.01-16.82. This includes surface related items paid for at 80% ODOT & 20% local, such as milling, asphalt, tack coat, long line pavement striping, etc. 106274~|~1~|~2~|~02/S<2~|~100% City of Bexley urban paving plan split.This includes items that are paid for 100% by the City of Bexley, such as pavement repairs, special striping, etc. 106274~|~1~|~3~|~03/NHS~|~Columbus Urban Paving plan split: FRA-40-15.27-15.30 & 15.30-15.70 (right side of the road only).This includes surface related items paid for at 80% ODOT and 20% local, such as, milling, asphalt, tack coat, long line pavement striping, etc. 106274~|~1~|~4~|~04/NHS~|~City of Columbus 100% plan split.This includes items that are paid for 100% by the City of Columbus, such as pavement repairs, special striping, etc. 119094~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 100613~|~1~|~1~|~01/STR~|~Chip sealing JEF-152 from Richmond Corp. Line to Empire Corp. Line. 100613~|~1~|~2~|~02/S<2~|~Chip sealing from the Empire Corp. Line to SR 7. 105921~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Licking County bridge replacement funded CEAO with federal max of $1,567,168 101480~|~1~|~1~|~01/NHS~|~DSR# COL-001 101480~|~1~|~2~|~02/NHS~|~change order to pay for damage claim 108876~|~1~|~1~|~01/STR/KCEO~|~CEAO CSTP Funding - 4B77 (80% Federal) / LNTP (20% Local) - CAP (See CAP Comments) - 1) Kno-CR 53 (Lock Road) from 00.00 to 00.81; 2) Kno-CR 53 (Lock-Homer Road) from 00.81 to 02.79; 123761~|~1~|~1~|~01/IMS~|~Plan split for sign replacements 110522~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 99827~|~1~|~1~|~01/MPO~|~Funding to cover interconnect replacement or new interconnect installation within Whitehall. 99827~|~1~|~2~|~02/S>2~|~Items not eligible for project participation.Signal work at: Broad St at Eastway Village Dr., Hamilton Rd at Immke, and Hamilton Rd at Woodcliff.To be paid 100% by the City of Whitehall. 105164~|~1~|~1~|~01/STR~|~AC Overly on SR 350 STP Rural in Clinton and Warren counties. 105164~|~1~|~2~|~02/STR~|~This plan split is for bridge work on this project. 92418~|~1~|~1~|~01/NFA~|~Resurfacing of existing drives and parking lots at Stillwater Prairie Reserve. 95539~|~1~|~1~|~01/STR~|~General System Resurfacing including pavement repairs and pavement markings on HOL-62 and HOL-60. 100616~|~1~|~1~|~01/NHS~|~Sealin bridge decks throughtout the District 104885~|~1~|~1~|~01/NFA~|~D09 Guardrail FY23 102847~|~1~|~1~|~01/NFA~|~FY2022 District wide raised pavement markers. 103434~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 95861~|~1~|~1~|~01/NFP~|~Culvert at SLM 22.50 116141~|~1~|~1~|~01/STR~|~Resurface SR 47 with Asphalt Concrete 108709~|~1~|~1~|~01/NHS~|~This project is for the installation only of the State of Ohio's state line slogan signs. 96880~|~1~|~1~|~01/ENH~|~Resurfacing of Holmes County Trail from Millersburg to Wayne County line; asphalt, double chip seal and limited repairs. Transportation Alternatives funds at 80% fed/20% local. 112966~|~1~|~1~|~01/STR~|~Rural plan split. 112966~|~1~|~2~|~02/NFA~|~Not on the federal aid system plan split. 113084~|~1~|~1~|~01/SAF~|~District-wide raised pavement markers. 88534~|~1~|~1~|~01/S>2~|~Milling of existing roadway and resurfacing with asphalt concrete on SR 725 from SLM 12.80 to Alexanderville Road SLM 13.82. 93771~|~1~|~1~|~01/STR~|~Reface backwalls using anodes, rebuild wingwalls using anodes, fix pier encasements and place rock channel protection at abutments on SFN 7500068 SHE SR 29 0679, Loramie Creek. 79735~|~1~|~1~|~01/NHS~|~Resurfacing 112214~|~1~|~1~|~01/NFA~|~D09 RPM FY2026 100383~|~1~|~1~|~01/IMS~|~Construct noise wall. 82999~|~1~|~1~|~01/STR~|~Bridge removal project. ATH 56 0624, SFN 0502529. Rural other federal aid funded 80 federal/20 state. 121707~|~1~|~1~|~01/SAF~|~Traffic Signals - Maintenance 121707~|~1~|~2~|~02/SAF~|~Traffic Signals - Capital 121707~|~1~|~3~|~03/SAE~|~Install supplemental signal heads and radar. 121707~|~1~|~4~|~04/SAE~|~Bellville Ped Crossing Improvements 99795~|~1~|~1~|~01/NHS~|~Reconstruction of US 422 from Rogers Avenue to Ridge Road in the City of Warren, Trumbull County, Ohio. 98785~|~1~|~1~|~01/ENH~|~Repair of 2 RR bridges, rehab of 2 grade crossings and tie replacement on the HVS Railway located at Watkins Street in the City of Nelsonville and Laurel Run Road (CR 26) in Hocking County. Funded 80 federal/20 local. 115013~|~1~|~1~|~01/STR~|~Superstructure replacements. 115013~|~2~|~2~|~02/STR~|~Bridge replacements, 10 to 20' span. 84278~|~1~|~1~|~01/BRO~|~Replace existing box culvert (BEL-800-1741, SFN 0705674) with a new four-sided concrete box. 125022~|~1~|~1~|~01/S50~|~Paving and sidewalk replacement/upgrade, utilizing 100% BOM 4TA7 funding. 105512~|~1~|~3~|~03/STR~|~items to be paid 100% by Plain City 105512~|~1~|~2~|~02/S>2~|~Paving within the Columbus Urban Area. FRA-161-0.00 to 0.68 105512~|~1~|~1~|~01/STR~|~Paving rural routes MAD-161-0.00 to 3.62; UNI-38-0.08 to 0.30; UNI-161-0.63 to 6.12; UNI-161-12.40 to 12.86 90232~|~1~|~1~|~01/S<2~|~?01/S<2/PV/Steu? ? In Steubenville plane and pave pavement, provide ADA accessible curb ramps, etc. on CR 22 (Brady and University) eligible for 80/20 MPO/City. 90232~|~1~|~4~|~04/S<2~|~?04/S<2/PV/Steu? ? Plane and pave, including striping on the SR 822 portion of the project eligibile under the Urban paving policy at 80/20 District/City. 90232~|~1~|~3~|~03/S<2~|~?03/S<2/PV/Steu? ? Plane and pave non federal aid roadways (Franklin Ave), to inlcude striping - 100% City. 90232~|~1~|~2~|~02/MPO~|~?02/MPO/PV/Steu? ? Traffic control items eligible for 100% MPO. 119749~|~1~|~1~|~01/NFP~|~Creating plan split for TED involvement 103921~|~1~|~1~|~01/NHS~|~Culvert Replacement: ERI-6-13.19 84368~|~1~|~1~|~01/STR~|~general system preventive mainenance on HOL-39-0.00 to 5.72; includes chip seal, minmal pavement repair, pavement marking 121098~|~1~|~1~|~01/IMS~|~Established Plan Split for CO CC 1 114448~|~1~|~1~|~01/NFP~|~Created for potential J&C involvement 124360~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federal bridge on the interstate system. 110300~|~1~|~1~|~01/NHS~|~Construct noise walls along SR 104 103472~|~1~|~1~|~01/NFA~|~The County is constructing roadwork improvements to alleviate flooding on Industrial Pkwy in the Lawrence Township Industrial Park. Over 3,200 feet of Industrial Pkwy flood making the road impassable for employees and the movement of goods 93874~|~1~|~1~|~01/MPO~|~Mill 2" and pave 3" of asphalt on Marks Road (CR 22) from Hamilton Road to SR 303, 2.83 miles. 93874~|~1~|~2~|~02/ENH~|~100% local items 84432~|~1~|~1~|~01/BRO~|~It is proposed to replace the deck on structure 0103187. Project Termini: Project is 0.14 mile east of TR312 (Riley Hollow Road) 0103187 ADA SR125 19.68 Intersect: Middle Br Of Mill Creek80% fed/20% state01/BRO/BR/State 110237~|~1~|~1~|~01/CMQ~|~Construction of 3.5 miles of 10? wide separated bike trail from existing bike trail at Troy-Sidney Road to Casstown-Sidney Road. 116683~|~1~|~1~|~01/STR~|~All work is in this plan split. 110330~|~1~|~1~|~01/SAF~|~funding Split for roundabout and TWLTL 99000~|~1~|~1~|~01/S>2~|~Summit St 99000~|~1~|~2~|~02/S>2~|~100% City costs for alt bid items 119967~|~1~|~1~|~01/CMQ~|~Construction of a single lane roundabout at Lions Bridge 121246~|~1~|~1~|~01/SAF~|~Delineator replacements in D8 104322~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work om STP Urban 104322~|~1~|~2~|~02/STR~|~Plan Split for resurfacing work in STP rural, CUY 322 from SLM 15.592 to 16.702. 115850~|~1~|~1~|~01/STR~|~Culvert replacement project. 84553~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 339 16.57-20.44 and 20.61-24.81. Rural other federal aid funded 80 federal/20 state. 115805~|~1~|~1~|~01/STR/FCEO~|~Fairfield County Engineer's CEAO CSTP Program - 4B77 (80% Federal) / LNTP (20 % Local) - See CAP Comment - Project to convert the All Way Stop at the intersection of Coon Path Road (CR 31) and Election House Road (CR 40) to a roundabout to include lighting. 113468~|~1~|~1~|~01/S>2~|~Install walk along the east side of South Gettysburg Avenue from Prison Road to 1812 S. Gettysburg Ave and along the west side from Prison Road to Nicholas Road. 113468~|~1~|~2~|~02/SAF~|~Alternative Items - 100% Local costs 94473~|~1~|~1~|~01/STR~|~Along Various routes in D-2. 110672~|~1~|~5~|~05/STR~|~Minor bridge rehab 10' to 20' span. 110672~|~1~|~2~|~02/STR~|~Resurfacing. 110672~|~1~|~1~|~01/NHS~|~Resurfacing. 110672~|~1~|~3~|~03/NHS~|~Minor bridge work > 20 span. 110672~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span. 111592~|~1~|~1~|~01/NHS~|~Federally eligible items. 91530~|~1~|~1~|~01/SAF~|~90/10 fed/state funding split for all work using federal safety funds. 91530~|~1~|~2~|~02/NFP~|~Split 2 for 100% state items of work 110086~|~1~|~1~|~01/IMS~|~Interstate Plan Split 110086~|~1~|~2~|~02/NHS~|~NHS Plan split. 110086~|~1~|~3~|~03/S<2~|~Urban Area plan split. 110086~|~1~|~4~|~04/STR~|~Rural Plan split. 119706~|~1~|~1~|~01/BRF/CRKV~|~Replacement of bridge along Buckeye Street (SFN 6461212) 104079~|~1~|~1~|~01/ENH/LCPD~|~"01/ENH/OT/LCPD" - Licking Park District approved TA funding for Multi-Use path - Max dollar amount at 95% funding $83,096.53 112947~|~1~|~1~|~01/IMS~|~Split for culvert work on the interstate system. 112947~|~1~|~2~|~02/NHS~|~Culvert work on the NHS 112947~|~1~|~3~|~03/S>2~|~Split for urban STP culvert work 112947~|~1~|~4~|~04/STR~|~Split for rural STP culvert work 85264~|~1~|~1~|~01/NHS~|~resurface SEN US23 0-9.98; SEN-23 from Wyandot Co Line to Fostoria; 85264~|~1~|~2~|~02/NHS~|~SEN-23-7.62 85264~|~1~|~3~|~03/SAF~|~Center Line Rumble Stripe Plan split - Sen - US 23 - 0.0 to 9.98 106405~|~1~|~1~|~01/STR~|~Widen US 36 and install signal at CR 605 (Condit Rd) 106405~|~1~|~2~|~02/STR~|~Replace and enlarge culvert carrying Chadwick Ditch (SLM 25.89) 97488~|~1~|~2~|~02/NFP~|~Culvert replacement of CFN 780450360 TRU-45-18.13 97488~|~1~|~1~|~01/NFP~|~Bridge replacement of SFN 7801653 TRU-SR 7-25.11 over Branch of Stratton Creek 96894~|~1~|~1~|~01/ENH~|~Testing 96894~|~1~|~2~|~02/IMS~|~test 114692~|~1~|~1~|~01/SAF~|~District wide pavement markings and RPM contract in D8. Locations to be determined. 116752~|~1~|~1~|~01/IMS~|~Plan Split for the maintenance and repair of the Big Darby Levee. 92796~|~1~|~1~|~01/NFA~|~100% facility funding 103883~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 103883~|~1~|~1~|~01/IMS~|~Resurfacing. 124924~|~1~|~1~|~01/NFP~|~CO 106757~|~1~|~1~|~01/IMS~|~Noise wall maintenance. 100428~|~1~|~1~|~01/STR~|~Two lane resurfacing project using a chip seal treatment. HOC 56 4.41-9.44. Rural other federal aid funded 80 federal/20 state. 109069~|~1~|~1~|~01/STR~|~UNI-739 from 0.63 to 5.94 109069~|~1~|~2~|~02/SAF~|~UNI-739 - Installation of Item 618 - CL Rumble Stripes and Item 874 - LJ Prep 109069~|~1~|~3~|~03/STR~|~Concrete deck overlay on structure UNI-739-0233 110645~|~1~|~5~|~05/STR~|~Minor bridge rehab > 20' structure. 110645~|~1~|~6~|~06/STR~|~Minor bridge rehab 10' to 20' structure. 110645~|~1~|~2~|~02/STR~|~Resurfacing. 110645~|~1~|~1~|~01/S5K~|~Resurfacing. 110645~|~1~|~4~|~04/S5K~|~Minor bridge work > 20' span. 110645~|~1~|~3~|~03/IMS~|~Minor bridge rehab. 102445~|~1~|~1~|~01/STR~|~Herbicidal Spraying in BEL, HAS and JEF 101463~|~1~|~1~|~01/S<2~|~City of Jackson Main St. 19468~|~1~|~1~|~01/IMS~|~Reconstruct intersection Ramp C/D and CR 74 including new traffic signal and turn lanes using district allocated funds 4PF7 & 4PS7 sacs. 100574~|~1~|~1~|~01/NHS~|~ROS 23 (1.95-4.65) 91460~|~1~|~2~|~02/S<2~|~General system paving and urban func class areaFAY-41: 10.33-10.76, 11.00-11.11, 13.03-15.48 91460~|~1~|~4~|~04/NFP~|~Not on Federal Aid System Split: FAY-753-10.37-10.51 91460~|~1~|~1~|~01/STR~|~General system paving and rural func classFAY-41: 0.00-10.33, 15.48-21.99; FAY-753:10.37-12.77 91460~|~1~|~3~|~03/S<2~|~WCH urban paving and in urban func class areaFAY-41: 10.76-11.00, 11.11-11.66, 12.15-13.03 118518~|~1~|~1~|~01/NHS~|~added plan split. 120687~|~1~|~1~|~01/NFP~|~Test lab 115477~|~1~|~1~|~01/NFP~|~Resurfacing of F-1 parking lots and Marina in TRU Mosquito State Park. 122031~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 88035~|~1~|~1~|~01/IMS~|~Tentative split for IM portion of FRA-70 reconstruction 88035~|~1~|~2~|~02/NHS~|~Tentative split for NH/add lane portion of FRA-70 reconstruction 93383~|~1~|~1~|~01/STR~|~Deck replacement project with steel beam end repair/paint. GAL 160 1884, SFN 2702371. Rural other federal aid funded 80 federal/20 state. 98970~|~1~|~1~|~01/ENH/TCE~|~Construct sidewalks along North River Road in Howland Township, Trumbull County, Ohio. 119263~|~1~|~1~|~01/IMS~|~Mowing 123709~|~1~|~1~|~01/STR~|~plan split for the rural locations on WAR-741 123709~|~1~|~2~|~02/S>2~|~plan split for the Large Urban sections on WAR-741 123709~|~1~|~3~|~03/S5K~|~plan split for the small urban section on WAR-741 93822~|~1~|~1~|~01/S>2~|~Resurfacing of State Route 91 from Ohio Turnpike Bridge to Middleton Road in the City of Hudson. Includes turn lane additions at Valley View Road, Herrick Park Drive, and Hines Hill Road. Includes possible ADA ramps, improved lighting, signals, as needed. 96250~|~1~|~1~|~01/STR~|~100% 4PS7 - Task Order Construction Inspection 97574~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. PRE-CALNT-0005 (SFN: 6842356) in the Village of New Paris. 87612~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4CP7 (100% State) - Two year contract for mowing along the Interstate Routes within District 5. 81104~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 325 8.64, SFN 2703572. 80/20% Federal/State. 124001~|~1~|~1~|~01/S5K~|~Resurfacing on SR 66 in the City of Defiance using urban paving funds. Funded at 80% SAC 4PF7 with a 20% local match provided by Defiance. 124001~|~1~|~2~|~02/NFP~|~100% city items. Auxiliary pavement markings, pavement repairs. 116328~|~1~|~1~|~01/NHS~|~Plan Split for the NHS locations 116328~|~1~|~2~|~02/STR~|~Plan Split for the Rural sections 116328~|~1~|~3~|~03/S5K~|~Plan split for the small urban sections 105453~|~1~|~1~|~01/IMS~|~IR 71 existing pavement resurfacing (Main St to S of Broad St and S of Long St to IR 670 interchange) 105453~|~1~|~5~|~05/IMS~|~Project eligible utility items (Waterworks, sanitary, electric, traffic surveillance 105453~|~1~|~6~|~06/MPO/Cols~|~MORPC and Columbus funded enhancements 105453~|~1~|~7~|~07/S>2/Cols~|~100% City of Columbus funded items 105453~|~1~|~8~|~08/ENH/Cols~|~Incremental items - Columbus to pay costs above standard items 105453~|~1~|~2~|~02/NHS~|~IR 71 existing pavement widening (from S of broad St to S of Long St.) and new pavements (Elijah Pierce Ave and Lester Dr) 105453~|~1~|~4~|~04/NHS~|~Broad St over IR 71 bridge replacement, widening 105453~|~1~|~3~|~03/IMS~|~Broad St over IR 71 bridge replacement, existing width, no added capacity. 105453~|~1~|~9~|~09/IMS/AEP~|~Utility vault for AEP (Columbus to pay and be reimbursed by AEP) 105453~|~1~|~10~|~10/IMS/ATT~|~Utility vault for AT&T (Columbus to pay and be reimbursed by AT&T) 105453~|~1~|~11~|~11/IMS/TW~|~Utility vault for Time Warner (Columbus to pay and be reimbursed by Time Warner) 105453~|~1~|~12~|~12/IMS/Ver~|~Conduit on the Broad St bridge for Verizon (Columbus to pay and be reimbursed by Verizon) 105453~|~1~|~13~|~13/SAF~|~Repair of damage caused by vehicle accidents 94628~|~1~|~1~|~01/IMS~|~Provide an auxiliary lane for southbound IR71 from the Pfeiffer on ramp to the SR126 off ramp. Requires extension of a culvert and moving of a short section of noise wall. Includes resurfacing of southbound IR71 adjacent to the auxiliary lane. 117530~|~1~|~1~|~01/NHS~|~Rest Area Culvert 113900~|~1~|~1~|~01/NFA~|~Created for TID involvement. 95474~|~1~|~2~|~02/NFA~|~100% local funding on resurfacing the small portion of Madison Avenue not on the federal aid system. 95474~|~1~|~1~|~01/S>2~|~local funds 101874~|~1~|~1~|~01/NFA~|~Guardrail replacement on various CR in Ross County. 112830~|~1~|~1~|~01/STR~|~Resurfacing. 112830~|~1~|~2~|~02/STR~|~Bridge preventive maintenance. 112830~|~1~|~3~|~03/STR~|~Superstructure repairs/replacement. 105213~|~1~|~1~|~01/NHS/STRE~|~Resurfacing, urban paving in the City of Streetsboro. 105213~|~3~|~4~|~04/CMQ/STRE~|~New signal. 105213~|~2~|~3~|~03/MPO/STRE~|~Concrete pavement replacement (with full depth concrete) at the intersection of POR SR 14 and SR 43, in the City of Streetsboro. 105213~|~1~|~2~|~02/NHS/STRE~|~Drainage work along POR SR 14 SB near SLM 1.70. Includes ADA curb ramps and full and partial depth repairs along SR 14 and SR 43. 93813~|~1~|~1~|~01/NFP~|~This is the district's FY 14 district wide lighting maintenance construction contract using 4CP7 sac. 106884~|~1~|~1~|~01/IMS~|~Landscape Maintenance and upkeep on existing landscape at the I-70/I-75 interchange in Montgomery County. 112937~|~1~|~1~|~01/STR~|~Rural Plan Split: MRW-19-8.78-10.40 103827~|~1~|~1~|~01/SAF~|~Guardrail upgrade on NHS routes. 103827~|~1~|~2~|~02/SAF~|~Guardrail upgrade on Sm Urban route. 116105~|~1~|~1~|~01/NFA~|~Culver/Repair on Little Miami Scenic Trail 105223~|~1~|~1~|~01/MPO~|~Work eligible for federal funding. 105223~|~1~|~2~|~02/NFP~|~100% local cost pay items 109865~|~1~|~1~|~01/NHS~|~D09 Overlay w/ Repairs FY25 102434~|~1~|~1~|~01/NHS~|~Split for bridge rehab 102434~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 124802~|~1~|~1~|~01/IMS~|~All items associated with work on I-71 ramps and SR-61. 92528~|~1~|~3~|~03/NHS~|~80/20 state/local funding split for urban paving along SR-82 in Broadview Hts for the NHS portion. 92528~|~1~|~4~|~04/S>2~|~80/20 state/local funding split for urban paving along SR-82 in Broadview Hts for the STP portion. 92528~|~1~|~1~|~01/SAF~|~Safety funding for the reconfiguration of the SR-82 and IR-77 interchange. 90% federal/ 10% local 92528~|~1~|~5~|~05/NFP~|~Split for 100% local participation and cost over capped funds. 92528~|~1~|~2~|~02/CMQ~|~CMAQ funding for the reconfiguration of the I-77/SR-82 interchange. 80% federal/20% local. 104677~|~1~|~1~|~01/S>2~|~Signal upgrades on urban route in the City of New Carlisle. 93039~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-SR 60-17.12 to 28.10 93039~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Bridges on 1) Cos-60-26.37, 2) Cos-60-26.74; 118622~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads. 98321~|~1~|~1~|~01/NHS~|~D09 Smoothseal FY23 87720~|~1~|~1~|~01/IMS~|~Smooth Seal: ASD-71-0.00-16.15 / WAY-71-0.00-0.28District Allocation will be : 7BPB- first $7,000,000.00, remainder is 90%-4PF7/4PS7 119446~|~1~|~1~|~01/NHS~|~Plan split for US 42 North of SR 18 as this section is on NHS. 119446~|~1~|~2~|~02/SAF~|~Safety funded plan split 119183~|~1~|~1~|~01/STR~|~Plan Split for resurfacing work on CLI-72 115046~|~1~|~1~|~01/SAF~|~Construction of traffic signal. 119062~|~1~|~1~|~01/NFA~|~All work included in this split. 90469~|~1~|~1~|~01/CMQ/SCE~|~Construct Beeson/Freshley Roundabout CR41, SLM 5.57 to SLM 5.59, in Stark County, Ohio. 104050~|~1~|~1~|~01/SAE~|~Pavement marking on various routes using 100% federal 4HB7 funds. 96357~|~1~|~1~|~01/NFP~|~Added plan split due to funding 98378~|~1~|~1~|~01/NHS/STRE~|~Resurfacing POR SR 43 from 19.76 to 20.66, urban paving in the City of Streetsboro. 98378~|~1~|~2~|~02/NHS~|~100% Streetsboro items, including full and partial depth repairs, curb and gutter. 102543~|~1~|~1~|~01/STR~|~Plan Split for the rural portion of SR 133 in Clinton County 96637~|~1~|~1~|~01/IMS~|~See linked structures. 96637~|~3~|~3~|~03/IMS~|~See linked structures. 96637~|~1~|~5~|~05/SAF~|~Install median guardrail/cable barrier along MAH IR 680 from 2.06 to 3.86, and install guardrail along bridge abutment at slm 8.16. 96637~|~3~|~4~|~04/IMS~|~See linked structure 10' to 20' span. 96637~|~2~|~6~|~06/IMS~|~Replacement of Structure with backfill and roadway. 96637~|~2~|~2~|~02/IMS~|~See linked structure. 96637~|~1~|~7~|~07/IMS~|~Emergency bridge hit repairs to MAH-680-4.66 SFN 5006864. 92563~|~1~|~1~|~01/STR~|~Replace retaining wall near cemetry 96670~|~2~|~8~|~08/S>2~|~See linked Structure > 20' span. 96670~|~2~|~6~|~06/IMS~|~Bridge Maintenance to the linked structures > 20' span. 96670~|~3~|~9~|~09/IMS~|~Repairing SFN# 7705646 (SLM 6.72) backwall and approach slabs. 96670~|~1~|~2~|~02/IMS~|~Widening portion of various structures. 96670~|~2~|~4~|~04/S>2/BARB~|~100% City of Barberton Items. Full and partial depth repairs. 96670~|~2~|~5~|~05/S>2/BARB~|~Resurfacing SUM SR 619 from 0.82 to 1.79 in the City of Barberton, urban paving. 118694~|~1~|~1~|~01/IMS~|~Slope repair along IR 70 EB exit and entrance ramps near SR 83 interchange. 121970~|~1~|~1~|~01/STR~|~All work to construct roundabout included in this split. 110689~|~1~|~1~|~01/S<2~|~Construction Inspection 110689~|~1~|~2~|~02/S<2~|~Construction Inspection 113350~|~1~|~1~|~01/SAF~|~Perform hill-cut on SR 118 south of the intersection with SR 707 to increase intersection sight distance. 93201~|~1~|~1~|~01/STR~|~General system paving of PIC-104: 0-21.47 93201~|~1~|~2~|~02/STR~|~STP Rural bridge deck overlay 80/20 PIC-104-8.94 over Big Darby overflow 113505~|~1~|~1~|~01/NHS~|~Construct noise wall along TRU SR 5 from SR 45 to SLM 11.44. 98539~|~1~|~1~|~01/NHS~|~Funding event for costs associated wtih the rehabiltiation of bridge HAM-27-0358 and HAM-42-0329. 100635~|~1~|~1~|~01/NHS~|~Microsurfacing of HAS-22 from 0.00 to 15.25 and from 18.90 to 21.68, and HAS-250 from SLM 8.02 to TR 238. 114733~|~1~|~1~|~01/NHS~|~FY25 Overlay. 114442~|~1~|~1~|~01/NHS~|~Resurfacing US 250 92534~|~1~|~1~|~01/NFP~|~Spot paving in Mahoning, Trumbull and Ashtabula counties. 94039~|~1~|~1~|~01/BRF~|~Bridge replacement on Structure File Number 1249681 CLA CR 314 0009. 121876~|~1~|~1~|~01/STR~|~Slide repair north of Morrow on WAR SR 123 107786~|~1~|~1~|~01/STR~|~Landslide repair project. 100% Federal ER funded. 105144~|~1~|~1~|~01/IMS~|~Resurfacing POR-IR 76 from 19.34 to 21.20 105144~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 105144~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span. 116947~|~1~|~1~|~01/STR~|~AC Overlay w/ Repairs on MED-83 / Smoothseal on WAY-585 116947~|~1~|~2~|~02/STR~|~Bridge Work to be completed with overlay project on SFN 5205123 MED-83-1.71 22937~|~1~|~1~|~01/S<2~|~Normal Project Participation with 3 funding priorities:1. D6 funding up to $5.0 M for RW & CO2. CEAO/Local (FAY Cty Eng) funding up to CEAO fed max of $2.0 M3. Local $'s (FAY Cty Eng) 93130~|~1~|~1~|~01/S>2~|~Yankee Road (TR-134): from Todhunter Road to MADE Industrial Drive Project involves total roadway reconstruction and widening from two to three lanes, minor realignment of the roadway, addition of curb and gutter and storm water system, signage, and pavement markings. 112460~|~1~|~1~|~01/MPO~|~Split for work eligible for MPO funding 112460~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items not federally eligible 116938~|~1~|~2~|~02/STR~|~Split for conduit work on the STP 116938~|~1~|~1~|~01/NHS~|~Split for conduit work on the NHS 111319~|~1~|~1~|~01/SAE~|~Guardrail project on various routes in Highland County. 110932~|~1~|~1~|~01/ENH~|~SRTS 119674~|~1~|~1~|~01/NFP~|~Installation of Liners 93288~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4202554 KNO SR13 4.37 Intersect: Sr 13 (Fredricktn Bypass); Not BR Eligible for Rehabilitation: Length=234 SD/FO(0) SR=82.0 DSR=6 93288~|~1~|~2~|~02/ENH~|~Enhancement to bridge (SFN 4202554) 103277~|~1~|~1~|~01/NFP~|~Replacing signs on various routes in STA and SUM Counties. 117714~|~1~|~1~|~01/NHS~|~FRA-16-6.06 over Mason Run; Replace culvert and upgrade railing 116088~|~1~|~1~|~01/NFP~|~Replacement of the Meigs Rest Area 10-31 as a smaller scale Gateway prototype. 97231~|~1~|~1~|~01/STR~|~ROS SR 207 4.73 94036~|~1~|~1~|~01/NFP~|~Thie Pleasant Valley Wildlife Area is a 1,465-acre wildlife area that lies between U.S. Route 35 and State Route 104, 3 miles northwest of Chillicothe. U.S. Route 35 lies adjacent to a portion of the area on the west side and is connected to the area by Union Lane at Pleasant Valley. The main access road is County Road 127 (Egypt Pike) off State Route 104. It is proposed to perform aggregate resurfacing and culvert repair/replacement. 100% State01/NFA/OT/State 114822~|~1~|~2~|~02/STR~|~Rural plan split. 114822~|~1~|~1~|~01/S5K~|~STP>5,000 plan split. 98183~|~1~|~1~|~01/STR~|~STP Rural resurfacing 80/20 MRW-229-0.00 to 5.30 105930~|~1~|~1~|~01/MPO~|~Rehabilitationn and resurfacing work eligible for federal-aid 115723~|~1~|~1~|~01/MPO/CANT~|~Construction of roundabouts on STA SR 172 at Broad Ave and Arlington Ave in the City of Canton. Includes new sidewalks, decorative light poles and landscaping. 114576~|~1~|~1~|~01/NFP~|~Added a split 92532~|~1~|~1~|~01/NFP~|~Crack Sealing various interstates in D04 92547~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 266 13.60-13.61. 80% Federal District preservation and 20% State. 111587~|~1~|~1~|~01/MPO~|~Federally eligible items in Construction/CE 111587~|~1~|~2~|~02/MPO~|~Plan split for the 100% local work items associated with the waterline replacement being performed as part of this proejct. 102624~|~1~|~1~|~01/NFP~|~Culverts 116234~|~1~|~1~|~01/NHS~|~FY28 Microsurfacing 104819~|~1~|~1~|~01/S<2~|~Consultant Construction Inspection 90657~|~1~|~1~|~01/IMS~|~Bridge HAM-75-1089L is to be rehabilitated by replacing the rigid overlay, painting the structural steel, and converting to semi-integral. SFN 3110419 101293~|~1~|~1~|~01/NHS~|~Split for bridge work on the NHS 101293~|~1~|~2~|~02/IMS~|~Split for bridge work on the interstate system 107475~|~1~|~1~|~01/S>2~|~Federal 80%/ Local 20% Urbanized Area Inside Corp. Limit (Paving Items):Resurfacing-Urban Paving City of AvonLOR SR 0083 SLM 15.31 (Corp Limit Avon/N. Ridgeville) to SLM 17.80 (0.24 mi. south of SR 254 (Detroit Ave.)) 107475~|~1~|~2~|~02/S>2~|~100% Local (Avon):Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps etc.):LOR SR 0083 SLM 15.31 (Corp Limit Avon/N. Ridgeville) to SLM 17.80 (0.24 mi. south of SR 254 (Detroit Ave.)) 107475~|~1~|~3~|~03/S>2~|~Bridge: SFN 4704223 - PREVENTIVE MAINTENANCE: EXPANSION JNT REPAIR/REPLACEMENT(048) 96612~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 147 9.60; NOB 215 4.09; NOB 339 5.38; NOB 340 2.50, 3.30, 5.17, 5.83, 5.93; NOB 513 10.11, 10.29. Rural other federal aid funded 80 federal/20 state. 96612~|~1~|~2~|~02/NFA~|~Culvert replacement project. NOB 564 1.01, 11.15 and NOB 672 0.05. Not on any federal aid system funded 100% state. 112912~|~1~|~1~|~01/S<2~|~PIC-22 from 15.98 to 17.12 112912~|~1~|~2~|~02/STR~|~PIC-104 from 2.90 to 6.32 and 8.73 to 15.32. PIC-22 from 14.32 to 14.92. 114186~|~1~|~1~|~01/NFA~|~Slide repair 91688~|~1~|~1~|~01/BRO~|~Replacement of the structurally deficient bridge carrying Hanes Road over the Fairground Road tributary. Work includes replacing the structure and associated in-stream work. New structure will be widened to accomodate three travel lanes, shoulders, and a sidewalk on both sides. 101267~|~1~|~1~|~01/NHS/ALLI~|~Resurfacing STA SR 183 from 17.66 to 18.76, urban paving in the City of Alliance. 101267~|~1~|~2~|~02/ENH/ALLI~|~Streetscaping along State Route 183 near Mount Union college. 121825~|~1~|~1~|~01/NFP~|~Lab Testing in D6 119738~|~1~|~1~|~01/SAF/FCEO~|~Installation of multi-use path and sidewalks along Refugee Road 123884~|~1~|~1~|~01/IMS~|~Plan Split for bridge deck replacement on Interstate System 95703~|~1~|~1~|~01/NHS~|~test 91891~|~1~|~2~|~02/NHS~|~"02/NHS/OT/ " - District Preservation Marking Pavements 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Marking of Pavements after resurfacing on Mus-SR 16-00.29 to 06.41 91891~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 16-00.29 to 06.41 108037~|~1~|~1~|~01/STR~|~Bridge ReplacementHUR-SR-162 02.710 SFN 3902730 (OVER MUD RUN)New Construction ? Structure(repl) (002) 100263~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inspection services District-wide. Estimated fee is $1.75M. 95415~|~1~|~1~|~01/SAF/LAW~|~It is proposed, using 100% Safety CEAO Funds, to upgrade existing pavement markings on various county routes in Lawrence County. 96853~|~1~|~2~|~02/ENH~|~SRTS project--nonparticipating portion of project which includes pavement for parking and waterline replacement. 96853~|~1~|~1~|~01/ENH~|~SRTS infrastructure project in the Village of Loudonville; sidewalk, pavement marking and signage---80/20 Fed/State. 94740~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 17.85 (SFN 3701565). Rural other federal aid funded 80 federal/20 state. 96448~|~1~|~1~|~01/STR~|~Culvert failure to be replaced with a Type A contract. 104292~|~1~|~1~|~01/NFA~|~ADA CR 2J 0.20 (SFN 0132225)ADA CR 1B 17.28 (SFN 0130060)ADA CR 10 0.14 (SFN 0136840) 96152~|~1~|~1~|~01/NFP~|~Construction of a new wash bay at the New Richmond Outpost in Clermont County. 100483~|~1~|~2~|~02/S<2~|~ROS 772 (13.24-15.27) 100483~|~1~|~1~|~01/STR~|~ROS 772 (10.35-13.24) 100483~|~1~|~3~|~03/STR~|~Bridge plan split placeholder. 115748~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the large urban portion: SLM 6.129-6.626 115748~|~1~|~2~|~02/S>2/FRB~|~Plan split for the 100% City items on the large urban portion: SLM 6.129-6.626 115748~|~1~|~3~|~03/NHS~|~Plan split for the 80/20 (ODOT/City) items on the NHS portion: SLM 6.626-6.91 115748~|~1~|~4~|~04/NHS/FRB~|~Plan split for the 100% City items on the NHS portion: SLM 6.626-6.91 121275~|~1~|~1~|~01/STR~|~Widen lanes and shoulders to accommodate bicycle and buggy traffic 106428~|~1~|~1~|~01/NFA~|~Plan split 107485~|~1~|~1~|~01/CMQ~|~Plan Split 93729~|~1~|~1~|~01/ERD~|~Construction of Station Park Trailhead and amenities along the TRU-Greenway Trail. 108735~|~1~|~1~|~01/BRF~|~JAC CR 501 0.73 (N. High St.) SFN 4061322 Bridge Replacement 116812~|~1~|~2~|~02/S>2/WARR~|~Resurfacing, urban paving in the city of Warren. 116812~|~1~|~1~|~01/S>2~|~Resurfacing. 116812~|~1~|~3~|~03/S>2~|~Bridge preventative maintenance 107293~|~1~|~1~|~01/NFA~|~ODNR paving project in Ross Lake Wildlife Area. 99713~|~1~|~1~|~01/NFP~|~Fence repair and maintenance along various routes in District Four. 99713~|~1~|~2~|~02/NFP~|~Fencing at assorted D-4 outposts and garages throughout the District. 88848~|~1~|~4~|~04/NHS~|~Work on the NHS outside of the City of Kenton. Work on SR 309 from 14.40 to the CSX RR Bridge at 14.49 on the left side of the road. All funds are from the District Preservation Program budget. No local funds. 88848~|~1~|~2~|~02/S<2~|~Work inside Urban Areas but outside the Cities. Work on SR 309 in Hardin County from Kenton Urban Area Boundary at CR 106 (13.79) to the corporation limits of the City of Kenton at 14.23 on both sides of the road. All funds are from the District Preservation Program budget. No local funds. 88848~|~1~|~1~|~01/STR~|~Work on SR 235 in Hardin County on the overlap with SR 309 SLM 14.98 to 15.98. Work on SR 309 in Hardin County from the Allen County line at 0.00 to the junction with SR 235 at 1.87 and then from the junction with SR 235 at 2.97 to the the Kenton Urban Area Boundary at CR 106 (13.79). All funds from the District Preservation Program budget. No local funds. 88848~|~1~|~5~|~05/NFA~|~Work on SR 195 in Hardin County which is a Rural Minor Collector and therefore not eligible for federal funds. Work from CR 110 at 0.00 to approximately 0.02 miles north of the south corporation limits of the Village of McGuffey at 0.98 and from approximately 0.02 miles north of W. Cottonwood Rd. at 1.04 to the north corporation limits of the Village of McGuffey at 1.52. All funds from the District Preservation Program budget no local funds 88848~|~1~|~3~|~03/NHS/KENT~|~Work inside the City of Kenton which is in Hardin County. Work on SR 309 from 14.23 to 14.40 on both sides of the road, from 14.40 to the CSX RR Bridge at 14.49 on the right side. The federal funds are from the District Preservation Program budget. The non-federal match is provided by the City of Kenton. 110394~|~1~|~1~|~01/NHS~|~AC overlay without repairs 100928~|~1~|~1~|~01/SAF~|~Replace full access intersection with RCUT. 100928~|~1~|~2~|~02/NHS~|~Leroy Rd Left Turn Lanes 110331~|~1~|~1~|~01/MPO~|~Milling and resurfacing. ADA ramps that do not meet standards will be reconstructed as necessary. 124755~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 562 1.82, SFN 5635101. 98558~|~1~|~1~|~01/STR~|~District Wide spot location mill & fill. Routes to be determined 91871~|~1~|~2~|~02/NHS~|~Plan split for the microsurfacing portion of the project. This is between SLM 13.48-18.48 91871~|~1~|~1~|~01/NHS~|~Plan Split for the resurfacing with repairs on HAm-27 between SLM 11.49-13.48 91871~|~3~|~3~|~03/SAF~|~Extension of left turn lanes at Haverkos/Redskin and Stone Creek intersections; adding keep right signs; adding delineators on medians. 96727~|~1~|~1~|~01/NFA~|~Summit County Greensburg Outpost, build a permanent 12 bay garage to be shared with ODOT Summit and Stark County as well as the Stark County Engineer 119739~|~1~|~1~|~01/S5K/NLEX~|~Sidewalks and curb ramps in the Village of New Lexington. TAP Funded - Carbon Reduction / Safety $2,010,000.00 Construction Phase at 80% 4CT7/20% 4HJ7 107344~|~1~|~1~|~01/NFA~|~D09 Bridge Maintenance FY24. 109469~|~1~|~2~|~02/STR~|~Chip sealing 109469~|~1~|~1~|~01/S5K~|~Chip seal. 118056~|~1~|~1~|~01/MPO~|~Plan Split 1 for MPO STBG funding. 119587~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of FAY US 22 and FAY CR 68 (Jamison Rd) 89434~|~1~|~1~|~01/STR~|~REPLACE BRIDGE AND UPGRADE INTERSECTIONS SFN 1234579 CLA CR 327 6.47. 110767~|~1~|~1~|~01/NHS~|~GR Replacement at various Lorain County Locations 116102~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - No CAP - 80% Federal (4PF7) and 20% State (4PS7) - replacement of existing structure (SFN 6403182) carrying SR 668 over Brehm Run. 110643~|~1~|~1~|~01/IMS~|~Resurfacing of STA IR 77 from 9.50 to 11.84. 110643~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 87862~|~1~|~1~|~01/SAF~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc.. at various locations in D-10. 80% Federal and 20% State. 111389~|~1~|~2~|~02/S<2~|~Resurfacing project to pave gravel roads. NOB CR 20 7.44-8.19. Funded through the CEAO Program. Urban other federal aid funded 80 federal/20 local. 111389~|~1~|~3~|~03/NFA~|~Resurfacing project to pave gravel roads. NOB CR 2 0.00-4.55. Funded through the CEAO Program. 111389~|~1~|~1~|~01/STR~|~Resurfacing project to pave gravel roads. NOB CR 20 4.65-7.44. Funded through the CEAO Program. Rural other federal aid funded 80 federal/20 local. 84459~|~1~|~1~|~01/BRF~|~SFN 7831005 Palmyra Rd CR 8 over little duck creek 105499~|~1~|~1~|~01/SAF~|~ADA 125 10.80-11.20 117325~|~1~|~1~|~01/MPO~|~Safety feedback signs 116876~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of CR7 (Plain City-Georgesville Road)/CR30 (Converse Huff Road)/CR 34 (Cemetery Pike). 104409~|~1~|~1~|~01/MPO~|~Installation of cantilever style dynamic message signs (DMS) on three routes in Cincinnati. 110965~|~1~|~1~|~01/SAF~|~LED Signs 88879~|~1~|~3~|~03/NHS~|~See linked structure. 88879~|~1~|~2~|~02/S<2~|~Resurfacing ATB SR 307 from 2.32 to 3.22. 88879~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 46 from 21.83 to 21.87 and SR 307 from 0.00 to 2.32 88879~|~1~|~5~|~05/STR~|~See linked structure between 10' and 20' span. 88879~|~1~|~4~|~04/STR~|~See linked structure > 20' span. 121590~|~1~|~1~|~01/S>2~|~STP > 200,000 91042~|~1~|~1~|~01/BRO/CUY~|~80/20 fed/local split using county bridge funds. 91042~|~1~|~2~|~02/BRO~|~100% local participation on work item requested by the LPA. 119014~|~1~|~1~|~01/S50~|~Widening pavement on Breese Road as well as drainage improvements. All work in this split. 113193~|~1~|~1~|~01/NFP~|~2020 OPERATIONS CHIP SEALS 105305~|~1~|~1~|~01/S>2~|~AC Overlay with repairs on:CLE-450 SLM 0.09 to 0.29CLE-450 SLM 0.29 to 0.38CLE-450 SLM 0.38 to 1.06 105305~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 94185~|~1~|~1~|~01/IMS~|~Resurfacing project to hold I-75 over until the TRAC project widen the pavement. Limits are between St. Bernard to SR 4. All ramps are included. 119924~|~1~|~1~|~01/NHS~|~Federally eligible. 124741~|~1~|~1~|~01/SAF~|~Minor widening of CR 71 (Spring Valley Road) from SR 142 to US 42 including drainage improvements, rumble strips, and RPMs. 98803~|~1~|~1~|~01/NFP~|~Rehabilitation of Bridge No. WAR-TR 207-0002 (SFN: 8334927) which carries Strout Road over the Little Miami River. 108187~|~1~|~2~|~02/STR~|~DSR# BEL-002, BEL-148-17.92 108187~|~1~|~1~|~01/STR~|~DSR# BEL-003, BEL-148-17.77 99377~|~1~|~1~|~01/STR~|~DAR-118-07.36/DAR-571-04.15/MER-49-06.52 - remove and replace existing culverts. SFN 1900633, DAR-47-1165, on Collett Ditch - field pave pipe invert with concrete to restore invert integrity. 97434~|~1~|~1~|~01/SAE~|~Upgrade of exisiting pavement markings. 107464~|~1~|~1~|~01/NFA~|~Plan split 93972~|~1~|~1~|~01/STR~|~ADA 781 2.12-10.99 93972~|~1~|~2~|~02/NFA~|~ADA 781 0.00-2.12 93871~|~1~|~1~|~01/SAE/LCEO~|~"01/SAE/OT/LCEO" - Licking County pavement marking project funded at 100% up to a maximum of $150,000 with CEAO funding 93871~|~1~|~2~|~02/SAE/LCEO~|~"01/SAE/OT/LCEO" - Licking County pavement marking project itendtified area in classified as OFAH- Rural (.81 Mile) 91865~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation of 4503872 LIC IR70 18.62 Intersect: Ir70 Under Tr303 Licking: BR Eligible: Length=198 SD/FO(1) SR=74.6 DSR=4 111100~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Overlaying the deck on SFN 1601423 111666~|~1~|~1~|~01/STR~|~Culvert replacements. 100897~|~1~|~1~|~01/NHS~|~BRO 52 12.49 (SFN 0801119) 92651~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete on MER-SR-703 SLM 8.21 to 11.13. 92651~|~1~|~2~|~02/S<2~|~Resurface the existing roadway with asphalt concrete. MER SR 703 SLM 6.49 to 8.21 MER SR 703 SLM 11.13 to 11.23 120284~|~1~|~2~|~02/NHS~|~NHS plan split for bridge painting for the following bridges: SFNs 2508737, 5100453. 120284~|~1~|~1~|~01/IMS~|~Interstate plan split for bridge painting of the following bridges: SFNs 2504731, 2506203. 120284~|~1~|~3~|~03/STR~|~Rural plan split for bridge painting for the following bridges: SFNs 5103517, 5102707. 114329~|~1~|~1~|~01/NHS~|~Split for urban paving eligible work, ie. concrete pavement repairs between the curbs excluding non-eligible work. 114329~|~1~|~2~|~02/NFP~|~Split 2 for work not eligible for urban paving funds including curb replacement/repair, full depth repairs, drive aprons, and ADA ramps 124226~|~1~|~1~|~01/NFA~|~Added Const Plan Split 1 110048~|~1~|~1~|~01/S<2~|~Resurfacing work on BUT-73 101719~|~1~|~1~|~01/S<2~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-SR 37-16.43 to 17.29; 101719~|~1~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-SR 37-17.29 to 25.84; 124013~|~1~|~1~|~01/MPO~|~TLCI Items 93050~|~1~|~1~|~01/S<2/FIND~|~This Plan Split is for road work eligible to use federal funds from the City of Findlay STP budget. 104016~|~1~|~1~|~01/ENH~|~plan split 113156~|~1~|~2~|~02/NFP~|~Split for paving a lane of Cedar Rd WB from the ramp to the bridge over IR-271 at 100% local expense. 113156~|~2~|~4~|~04/IMS~|~Part 2 for PID 104380 resurfacing of IR 271; north from Cedar road overpass and south in entirety. 113156~|~1~|~1~|~01/SAF~|~Plan split for work associated with NB Safety project to modify the IR-271 NB/Cedar-Brainard interchange approach to add storage capacity and modify the northbound express lane/local lane slip ramps. 113156~|~1~|~3~|~03/IMS~|~Plan Split for the resurfacing work along I-271 in PID 113156 in conjunction with the safety project. 107252~|~1~|~1~|~01/STR~|~Construction of a left turn lane in the Village of McArthur at VIN 50 16.86. ARC funded 100% federal. 77355~|~1~|~1~|~01/IMS~|~priority system resurfacing of IR 70 with 1in. of Fine graded Poly. mod. Asphalt, includes pavement marking, 97427~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various County roads. 114727~|~1~|~1~|~01/SAF~|~District-wide raised pavement markers. 123455~|~1~|~1~|~01/STR~|~Resurfacing SR 43 120296~|~1~|~1~|~01/STR~|~Bridge replacement of LIC-79-32.19 (SFN 4505255) 123224~|~1~|~1~|~01/STR~|~120' landslide repair on SR 329-13.26 mm. 112372~|~1~|~1~|~01/S>2~|~Bridge Replacement 112372~|~1~|~2~|~02/S>2~|~Sanitary sewer items at 100% local costs 116993~|~1~|~1~|~01/MPO~|~Installation of roundabout 116993~|~1~|~2~|~02/MPO~|~Plan Split for MPO funded resurfacing on Erie St. 116993~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded items, such as resurfacing non-Federal aid roadway not necessary for roundabout and decorative features. 108373~|~1~|~1~|~01/S<2~|~Resurfacing in the City of Delphos. The 80% federal funds are from the District Preservation Program budget and are urban STP funds. The 20% match will be provided by the City of Delphos. 108373~|~1~|~2~|~02/CMQ~|~CMAQ eligible work for bicycles and pedestrians. 80% federal MPO-CMAQ funds. If needed, after the CMAQ funds are used MPO-STP funds can be used, The 20% match is to be provided by the City of Delphos. If all federal funds are used, funding will be provided 100% by the City of Delphos. 108373~|~1~|~5~|~05/NFP~|~For work that will not use federal funds such as work on an unwarranted traffic signal. 100% of the funding will be provided by the City of Delphos. 108373~|~1~|~4~|~04/SAF~|~Work eligible for funding from the Safety Program. The Safety Program funds are 90% federal SAC 4HJ7 and 20% state funds. If available, after the Safety Program cap is reached MPO-STP funds can be used. If all federal funds are used, funding will be provided 100% by the City of Delphos. Work to install a road diet throughout the corridor, upgrade traffic signals, and adjust the traffic signal timings to improve traffic flow, and install side street detection to signalized intersections. 108373~|~1~|~3~|~03/MPO~|~For work not eligible for urban paving funds or CMAQ funds. 80% federal MPO-STP funds. The 20% match and any funds needed after the cap is reached will be provided by the City of Delphos. 121894~|~1~|~1~|~01/STR~|~Bridge replacement of COS SR 83 03.21 (SFN 1601644) 117354~|~1~|~1~|~01/BRF~|~Bridge replacement 82645~|~1~|~1~|~01/S<2~|~Intersection Reconstruction / Widening - Turnpike State 4TK7 - NOACA Fed 4TA7/Elyria Local 4BG7 82645~|~1~|~2~|~02/S<2/ELR~|~100% City of Elyria Funds for Fire Hydrant and Signal Controller items 122231~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-90-C 90808~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete on SR 47 in Bellefontaine from County Road 21 (SLM 11.71) to Everett Street (SLM 12.91). 111484~|~1~|~1~|~01/SAF~|~Guardrail replacement on various county routes with 100% CEAO Safety funding (4HB7). 102462~|~1~|~1~|~01/IMS~|~To upgrade the existing signing along IR 70 and IR 77 in Belmont and Tuscarawas counties. 97541~|~1~|~1~|~01/STR~|~Ohio Bridge Partnership Program. Congress Rd over a branch of East Branch of the Black River 97541~|~1~|~2~|~02/STR~|~Ohio Bridge Partnership Program, Seville Rd over Camel Creek 110118~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 550 3.31. 90254~|~1~|~1~|~01/SAF~|~Ross County pavement marking project on various routes.100% Fed per CEAO 114516~|~1~|~1~|~01/BRO~|~Split for deck replacement over Lee Road 114516~|~1~|~2~|~02/SAF~|~Safety speed enforcement 113891~|~1~|~1~|~01/STR~|~FDR MED 57 03.49 to 8.82. 113891~|~1~|~2~|~02/S>2~|~FDR MED 57 8.82 to 10.39. 113891~|~1~|~3~|~03/STR~|~Bridge Rehabilitation to be completed along with the FDR Major Rehabilitation project. 113891~|~1~|~4~|~04/STR~|~Culvert Rehabilitation / Replacements to be completed along with the FDR Major Rehabilitation project. 113891~|~1~|~5~|~05/IMS~|~Bridge Rehabilitation to be completed at MED-57 over IR 71 bridge along with the FDR Major Rehabilitation project. 97317~|~1~|~1~|~01/STR~|~ROS CR VAR RPM FY19 81142~|~1~|~1~|~01/BRF~|~CEAO BR projectReplace bridge on MAR-CR141/Saint James Road over Olentangy RiverLocal Sponsor - MAR County Engingeer5132428 MAR CR141 0.4 Intersect: Br Over Olentangy River 16987~|~1~|~3~|~03/S<2~|~Urban area and urban/Marysville system (fed/local) pavingUNI-736: 7.95-8.4103/S<2/PV/F_LC 16987~|~1~|~4~|~04/STR~|~Minor work (sealing, patching, asphalt OL) on 5 bridges8003068 UNI SR736 0.62 Intersect: Robinson Run8003165 UNI SR736 2.65 Intersect: Miller Ditch8003181 UNI SR736 3 Intersect: Adams Run8003211 UNI SR736 4.08 Intersect: Blumenschein Ditch8003238 UNI SR736 7.42 Intersect: Over Bishop Ditch 16987~|~1~|~1~|~01/STR~|~Rural area and general system (fed/state) pavingUNI-736: 0.00-7.8201/STR/PV/ 16987~|~1~|~2~|~02/S<2~|~Urban/Marysville area and general system (fed/state) pavingUNI-736: 7.82-7.9502/S<2/PV/F_ST 116611~|~1~|~1~|~01/STR~|~Pavement Markings 107531~|~1~|~2~|~02/S5K~|~Asphalt resurfacing within the City of New Philadelphia 107531~|~1~|~3~|~03/S5K~|~100% City funded items 107531~|~1~|~1~|~01/S<2~|~Resurfacing TUS-259 where the roadway is not entirely within the New Philadelphia corp limits 105041~|~1~|~1~|~01/NFP~|~Raised Pavement Marker (RPM) contract for FY2023. 107866~|~1~|~1~|~01/CMQ~|~Widen SB South Gilmore/Winton Road for an additional through lane between Omniplex Drive and Ramp Y, convert existing SB right turn at Omniplex Drive into a through/right, and widen Ramp Y for an additional WB lane. 107176~|~1~|~1~|~01/NFA~|~Motor paving ATH CR 73 (Wolfe Bennett Road). Total of 3.52 miles. FLAP funded. Not on any federal aid system funded 80 federal/20 local. 116863~|~1~|~1~|~01/STR~|~Resurfacing 122595~|~1~|~1~|~01/ERD~|~Stabilize upper portion of existing retaining wall and replace inadequate and failing guardrail with a combination vehicle/bicycle railing. 82435~|~1~|~1~|~01/NHS~|~Resurface the existing roadway with asphalt concrete and other roadway related items on AUG-US-33 117969~|~1~|~1~|~01/STR~|~Rehabilitation of PER SR 345 6.49 (SFN 6402666). 99567~|~1~|~1~|~01/NHS~|~US-20 from 0 to 27.912 25227~|~1~|~1~|~01/STR~|~Culvert replacement of structure over branch of the Ashtabula River SFN 0400548 108418~|~1~|~1~|~01/S>2~|~Mill and fill in the City of Huber Heights. MOT SR 201 SLM 4.36 to 6.00 98226~|~1~|~1~|~01/NFP~|~Plan Split for D05 CS FY2025 - 100% State 82264~|~1~|~1~|~01/NHS~|~Sign Replacement 117057~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing. 82919~|~1~|~4~|~04/NHS~|~Plan Split for SFN# 6703755, POR US 224 01.05, over the Wheeling Lake Erie railroad, Suffield Township, Portage County, Ohio. 82919~|~2~|~6~|~06/BRO~|~Plan Split for SFN# 6703879 POR US-224 07.14 over Congress Lake Outlet, Randolph Township, Portage County, Ohio. 82919~|~1~|~2~|~02/NHS~|~Resurfacing of US-224 from SLM 0.00 to SLM 2.42, in Suffield Township, Portage County, Ohio. 82919~|~1~|~1~|~01/STR~|~Resurfacing of US-224 from SLM 3.85 to SLM 12.99, in Suffield, Randolph, and Atwater Townships, Portage County, Ohio. 82919~|~1~|~3~|~03/S>2~|~Resurfacing of US-224 from SLM 2.42 to SLM 3.85, Suffield Township, Portage County, Ohio. 82919~|~1~|~5~|~05/STR~|~Plan Split for SFN 6703844 POR US 224 08.31, SFN 6703909 POR US 224 11.71, SFN 6703933 POR US 224 11.89. 95975~|~1~|~1~|~01/NFP~|~Demolish old salt domes. Build new salt building. 4000 ton cap. 82825~|~1~|~4~|~04/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 78 2.29-3.73 and HOC 78 0.00-3.32. NHS route funded 80 federal/20 state. 82825~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 78 1.97-2.29. NHS route in the City of Nelsonville funded 80 federal/20 local. 82825~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 78 4.00-8.73, 9.75-11.20, and HOC 216 0.10-4.68. Rural other federal aid funded 80 federal/20 state. 82825~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 78 3.73-4.00 and HOC 216 0.00-0.10. Urban other federal aid funded 80 federal/20 state. 93590~|~1~|~1~|~01/BRO~|~Provide a new MSC overlay on bridge BEL-7-0685 (SFN 0700274). Remove the existing MSC overlay using hydrodemolition 90576~|~1~|~1~|~01/NFP~|~This is a guardrail contract using maintenance operating funds. 117737~|~1~|~1~|~01/BRF~|~BFP - CEAO funding for bridge rehab 95878~|~1~|~1~|~01/NFP~|~Culvert work plan split: 430440615 100643~|~1~|~2~|~02/S5K~|~plan split for work in the Small Urban section:CLI-134: SLM 10.58-11.95CLI-134: SLM 15.21-15.52 100643~|~1~|~3~|~03/NFA~|~Plan split for work on CR 1 inside the Village of Port William between the end of CLI-134 and the bridge over Anderson Fork 100643~|~1~|~1~|~01/STR~|~plan split for roadway work in the Rural sections:CLI-134: SLM 7.53-10.58CLI-134: SLM 15.52-22.08 114136~|~1~|~1~|~01/NFP~|~CE funding 100246~|~1~|~1~|~01/MPO~|~Repair and resurface SR-91 using MPO STP funds. 111565~|~1~|~1~|~01/BRF~|~Muni-Bridge funded items 123655~|~1~|~1~|~01/S>2~|~Plan split for pavement preventative maintenance contract on various routes throughout the district, classification to be determined when roadway segments identified. 114612~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance 95580~|~1~|~1~|~01/IMS~|~Bridge Rehabilitation - MED-071-01.39 110375~|~1~|~1~|~01/SAF~|~All work on SR 29 & SR 38 to construct the roundabout except for the work on structure MAD-38-21.52 110375~|~1~|~2~|~02/SAF~|~Lengthen MAD SR 38-2153 culvert 87697~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 107749~|~1~|~1~|~01/NHS~|~Covers all work to rehab bridge. 98356~|~1~|~1~|~01/S>2~|~Demolition of building. 94970~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 99375~|~1~|~1~|~01/S<2~|~SFN5504198, MIA-571-0661, on Stillwater River - 1. Restore expansion joint system at abutments. 2. Correct erosion to embankment on rear left and rear right ends. 3. Refurbish and reset abutment rocker bearings. 99375~|~1~|~2~|~02/STR~|~Remove asphalt wearing surface and waterproofing from non-composite box beam bridge and place new non-composite SDC hard overlay for the wearing surface. Patch rear abutment backwall. Seal concrete surfaces with epoxy urethane. 115797~|~1~|~2~|~02/SAE~|~Multi-Use Path along 161 from Ambleside/Satinwood Drive to Maple Canyon Ave 115797~|~1~|~1~|~01/S>2~|~Roundabouts on Sharon Woods Blvd/Tamarak Blvd, and Beechcroft north & south of 161, resurfacing of service roads and traffic signal work. 95194~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 556 9.37. Emergency A project. Rural other federal aid funded 100% state. 100010~|~1~|~1~|~01/NFP~|~Rehabilitation and resurfacing of various roads and parking areas within Winton Woods Park. 89721~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work eligible for MPO enhancement funds. 89721~|~1~|~2~|~02/ENH~|~100% local items not eligible for enhancement funding or cost of the project has exceeded the capped funds therefore locals will pick-up the rest of the cost. 102055~|~1~|~1~|~01/STR~|~Park & Ride area including, fencing, lighting and drainage. 109337~|~1~|~1~|~01/NHS~|~Culvert replacement BEL-7-9.79. 95739~|~1~|~1~|~01/STR~|~HEN-108 from SLM 0.00 to SLM 5.94 95739~|~1~|~2~|~02/BRO~|~Bridge Plan split for Hen-108-0412 93620~|~1~|~1~|~01/ENH~|~BRO Mt. Orab SRTS Boyd Road - Safe Routes to School It is proposed to construct new side walks alongy Boyd Road in the Village of Mt. Orab using SRTS funds. 100% Fed 01/ENH/OT/Mt. Orab 97353~|~1~|~1~|~01/NFP~|~Adding to phase change 108326~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MRG 266 3.30. DSR MRG-006. Rural other federal aid funded 100% federal ER funds. 102777~|~1~|~1~|~01/IMS~|~Highway Lighting Maintenance Contract D07 2018-2019 102777~|~1~|~2~|~02/IMS~|~Highway Lighting Maintenance D08 2018-2019 99202~|~1~|~1~|~01/SAF~|~All work eligible for federal funding for this project. 100494~|~1~|~1~|~01/NHS~|~PIK 32 (19.92-28.42) 89386~|~1~|~1~|~01/S<2~|~SCI SR823, Building Demo It is proposed to demolish various buildings on the Portsmouth ByPass. Reference this PID to PID 19415. STIP referecne number is 2237 whcih is also on PID 19415. Also, the environmental clearance is coverd under PID 19415. PID 19415 is Phase 1 of the Portsmouth ByPass. 80/20 split01/S<2/OT/State 97684~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 53.33. GSM funded. Rural other federal aid funded 80 federal/20 state. 97684~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MEG 124 45.80-62.33. Rural other federal aid funded 80 federal/20 state. 97684~|~1~|~3~|~03/NFA~|~Resurfacing of the Meigs County Garage parking lot. 115594~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 87721~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 87721~|~2~|~2~|~02/IMS~|~Bridge Work 119415~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m. 121420~|~1~|~1~|~01/NHS~|~Plan split for NHS portion of SAN-20 93824~|~1~|~1~|~01/STR~|~Encase the piers on GAL SR 325 15.91 (SFN 2703696). Bridge repair project. VIN 327 10.18 (SFN 8202281). Pile encasements. Rural other federal aid funded 80 federal/20 state. 104870~|~1~|~2~|~02/IMS~|~Build new rest are on current site - IR 71 SB 104870~|~1~|~1~|~01/IMS~|~Build new rest area on Current Site - IR 71 NB 104870~|~1~|~3~|~03/NFP~|~Work to be performed at the NB 71 rest area at the Governor's request. 75610~|~1~|~1~|~01/BRF~|~Bridge replacement 86719~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation - No CAP - 100% 4PS7/0005 for hauling of RAP from the project. 86719~|~1~|~2~|~02/ENH~|~"02/ENH/PV/ " - Transportation Enhancment Funds (SAC 4B37) Capped at $264,000.00 which is the 80% share for CO and CE sub-phases - for the replacement of sidewalks and catch basins along SR 60 between the 08.15 and the 08.86 mile markers. 86719~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation Funding - No CAP's - Resurfacing - Mus-SR 60-08.03 to 08.86 - Treatment consists of Full/Partial Depth Repairs, 2" Mill; 3/4" intermediate course; 1-1/4" surface course 97873~|~1~|~1~|~01/NFA~|~Fulton County Garage. 124991~|~1~|~1~|~01/CMQ~|~MPO CMAQ Funding 110381~|~1~|~1~|~01/S<2~|~Landslide repair project. MEG Mill Street (CR 5) 0.35, in the Village of Middleport. DSR MEG-001. Funded 100% federal. 119982~|~1~|~1~|~01/MPO~|~MVRPC carbon reduction (CR) program construction funds awarded at a 22% match. 101696~|~1~|~1~|~01/STR~|~Resurfacing along US 62 and SR 205 in Knox County. 101886~|~1~|~1~|~01/CMQ~|~Installation of fiber optic interconnect cable, upgrading signals to LED technology, installation of new signal controllers, and implementation of new signal timing in City of Cincinnati traffic signal Zone 9. 96952~|~1~|~1~|~01/NHS~|~80% federal /20% state using Major New funds to install approximately 1400-ft of noise wall along westbound SR-2 near Hendricks Road. 101974~|~1~|~1~|~01/SAE~|~100% HSIP funding from the CEAO up to the cap. The amount over the cap will be provided by Putnam County. All the federal funds will be used in the Construction Contract subphase. The County is not currently seeking cost recovery for Construction Engineering costs. 101753~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - Plan split 1 101753~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - Plan Split 2 110799~|~1~|~1~|~01/SAF~|~Improvements to FRA SR 3 from Agler Rd to Oakland Park Ave to improve safety and congestion 103332~|~1~|~1~|~01/S<2~|~Mill and fill - UPP 103332~|~1~|~2~|~02/NHS~|~Mill and fill - UPP 107182~|~1~|~1~|~01/NFA~|~Corrections to the Thornwood Drive on both sides of the railroad crossing. Improvements will include Engineering Design, ROW, pavement repairs, asphalt surfacing, drainage improvements, shoulder widening and other ancillary items. 96561~|~1~|~1~|~01/STR~|~Resurfacing POR SR 88 from 2.54 to 4.02 and Resurfacing POR SR 303 13.74 to 20.63. 96561~|~1~|~2~|~02/S>2~|~Resurfacing POR SR 88 from 1.51 to 2.54. 96561~|~1~|~3~|~03/S>2/RAV1~|~Resurfacing POR SR 88 from 0.00 to 1.51 in the City of Ravenna...80/20 cost split. 96561~|~1~|~5~|~05/S>2~|~Minor Bridge Work on SFN 6703534 POR SR 88 1.63 over Harmon Creek 96561~|~1~|~4~|~04/BRO~|~Minor Bridge Work on SFN 6704506 POR SR 303 over Branch of Eagle Creek. 99080~|~1~|~1~|~01/NFP~|~Constuct a 500 ton salt storage structure in Monroe County. Funded 100% state. 119974~|~1~|~1~|~01/S>2~|~Resurfacing, safety, and pedestrian improvements on Livingston Ave 115418~|~1~|~1~|~01/IMS~|~Plan split 112489~|~1~|~2~|~02/NFA~|~AC overlay 112489~|~1~|~1~|~01/STR~|~Resurfacing 113188~|~1~|~1~|~01/NHS~|~Rock slope repair 96276~|~1~|~1~|~01/SAF~|~Guardrail project. Upgrading existing guardrail on various routes and sections in Meigs County. Funded 100% federal. 124897~|~1~|~1~|~01/CMQ~|~MPO CMAQ funding 124437~|~1~|~1~|~01/STR~|~Replace culvert type bridge carrying SR 172 over Branch West Fork Little Beaver Creek. 13239~|~1~|~1~|~01/STR~|~Brdg Replacement. .06 MI. N OF CR46 (MCDERMOTT-POND RD) 7302738 SCI SR73 16.87 Intersect: Stream7302762 SCI SR73 17.29 Intersect: Stream80 Fed/20 State. Both brdgs are eligible for BR funding but only for rehab, not replacement. 01/STR/BR/State 115554~|~1~|~1~|~01/STR~|~Two-lane resurfacing project. MRG CR 3 0.00-7.62. Work includes striping. centerline and safety edge. Funded 80 Federal/20 Local. 102003~|~1~|~1~|~01/IMS~|~Highway Lighting Maintenance: LOR-90-10.78-11.96 112623~|~1~|~1~|~01/MPO~|~Resurfacing of Mahoning Ave from Belle Vista Ave to IR 680 in the City of Youngstown. 117067~|~1~|~1~|~01/SAF~|~Safety related intersection improvements on ROS 50. 101967~|~1~|~1~|~01/S<2~|~Apply herbicide along roadsides for weed control on 4 lane roads. 104660~|~1~|~1~|~01/BRO~|~Bridges 76353~|~1~|~2~|~02/IMS~|~Bridge deck patching, bridge deck sealing, approach slab resurfacing90/10 federal/state funding:2402343240225424023784902971490309949029122402319490294724022892402408240216549030644903129240233502/IMS/BR/ 76353~|~2~|~6~|~06/NHS~|~Bridge deck sealing. 80/20 federal/state funding:24008982400928240083924008552400790240086304/NHS/BR 76353~|~2~|~5~|~05/NHS~|~Minor rehab pavement work, 80/20 D6 federal/state fundngFAY-35-7.51 to 12.04 76353~|~1~|~3~|~03/IMS~|~Interstate Pavement Markings & RPMsFAY-71 & MAD-71 76353~|~2~|~7~|~07/STR~|~Minor rehab pavement work, 80/20 D6 federal/state fundngFAY-435-1.26 to 1.32 / 1.50 to 16.7 76353~|~2~|~4~|~04/NHS~|~NHS Pavement Markings & RPMsFAY-35 & FAY-435 76353~|~1~|~1~|~01/IMS~|~Minor rehab pavement work, 90/10 D6 federal/state fundngFAY-71: 9.45-14.66; MAD-71: 0.00-4.5601/IMS/PV/ 115725~|~1~|~1~|~01/BRO~|~The bridge. 109470~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacements on various routes throughout District 4. 107465~|~1~|~1~|~01/NHS~|~Resurfacing US 22 115857~|~1~|~1~|~01/SAF/COSH~|~Upgrade of Signal Equipment within the City of Coshocton 94209~|~1~|~1~|~01/IMS~|~District wide bridge sealing contract. 94209~|~1~|~2~|~02/NHS~|~District wide bridge sealing contract 103704~|~1~|~4~|~04/S50~|~ERI-250-0.00 TO 0.49, Concrete Repairs in Sandusky (50/50% FED/LOC) Associate Add 103704~|~1~|~3~|~03/S50~|~Bridge Work SFN 2201542 ERI US 6 4.421 Bridge Rehabilitation 103704~|~1~|~2~|~02/S50~|~100% City of Sandusky ItemsUrbanized Area Inside Corp. Limit(Items Such as Pavement Repairs, curb removed, curb, etc.):ERI US 06 03.64 to 05.61 103704~|~1~|~1~|~01/S50~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit(Paving Items):ERI US 06 03.64 TO 05.61 93291~|~1~|~1~|~01/IMS~|~?01/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP ? Deck replacement: 1) SFN 3002195, GUE-IR 70-25.27R carrying IR 70 over CR 94. BR Eligible for Rehabilitation: Length=112; SD/FO = (0); SR = 79.4; DSR = 5; 2) SFN 3002160, GUE-IR 70-25.27L carrying IR 70 over CR 94. BR Eligible for Rehabilitation: Length=112; SD/FO = (2); SR = 75.3; DSR = 5; 91564~|~1~|~1~|~01/NHS~|~Replace existing superstructure on continuous slab bridge (JEF-7-0131, SFN 4100042) with a new slab superstructure. Replace abutments and provide new approach slabs. The vertical clearance will need to be increased by lowering profile of roadway under bridge. 114396~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - 80% federal, 20% State 115517~|~1~|~1~|~01/NFP~|~Bridge replacement 95125~|~1~|~1~|~01/STR~|~Culvert on SR-4 in Seneca County 115623~|~1~|~1~|~01/IMS~|~MOWING 96099~|~1~|~1~|~01/NHS~|~Plans Split for Rockfall/Bench Cleaning 119961~|~1~|~1~|~01/CMQ~|~Widen Kemp Road from North Fairfield Rd to Hanes Rd. Includes curb, gutter, storm sewer and sidewalk 119210~|~1~|~1~|~01/STR~|~Traffic Signal and Highway Lighting Maintenance 102742~|~1~|~1~|~01/S>2/AKRO~|~Resurfacing, urban paving in the City of Akron. 102742~|~1~|~2~|~02/S>2/AKRO~|~100% Akron items including ADA curb ramps, full and partial depth repairs. 121340~|~1~|~2~|~02/S5K~|~STP >5 Plan Split 121340~|~1~|~3~|~03/STR~|~STP Rural <5 Split. 121340~|~1~|~1~|~01/NHS~|~NHS plan split 101865~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on IR 70 throughout Preble County. 101313~|~1~|~1~|~01/IMS~|~plan Split for resurfacing on HAM-74 and HAM-275 110850~|~1~|~1~|~01/NHS~|~Lighting plan split 106706~|~1~|~1~|~01/STR~|~See linked culvert. 109694~|~1~|~1~|~01/NHS~|~Resurfacing TUS-250 107372~|~1~|~1~|~01/NFP~|~Installation of raised pavement markings (RPMs) along various routes in D5. 109076~|~1~|~1~|~01/IMS~|~Erosion protection near Furnace Run structures along IR-77 in Summit County. 93207~|~1~|~1~|~01/IMS~|~Remove and replace deck overlay and patch large spalls on abutment using annodes on SFN 5708826 MOT 75 1636 (Keenan Avenue). 105578~|~1~|~1~|~01/IMS~|~Interstate plan split: FAY-71-0.00-2.40 105578~|~1~|~2~|~02/STR~|~Rural plan split: FAY-38-8.24-8.95 FAY-62-15.49-26.74 105578~|~1~|~3~|~03/NFA~|~Not on federal aid system plan split: FAY-729-9.68-9.86 105578~|~1~|~4~|~04/NHS~|~NHS plan split: FAY-62-14.42-15.49 107034~|~1~|~1~|~01/BRO~|~LBR funding for bridge. 102699~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. VIN 93 2.156-7.200. Rural other federal aid funded 80 federal/20 state. 102699~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment. VIN 93 0.00-2.156. Urban other federal aid funded 80 federal/20 state. 108768~|~1~|~1~|~01/S<2~|~All work in this project. 107494~|~1~|~1~|~01/STR~|~Resurfacing CAR-542 107494~|~1~|~2~|~02/SAF~|~Centerline rumble striping work 92885~|~1~|~1~|~01/NHS~|~Urban paving - 80/20 - District Allocation/City of Lorain 92885~|~1~|~2~|~02/S<2~|~Urban paving - 80/20 - District Allocation/City of Lorain. 92885~|~1~|~3~|~03/S<2~|~100% City of Lorain. 105486~|~1~|~1~|~01/NHS~|~4PS7 (100% State) - Emergency Bridge Strike repairs on the Wilson Road Bridge over US 33 Fai-US 33-11.58 102072~|~1~|~1~|~01/ENH~|~Multiuse path. 124237~|~1~|~1~|~01/IMS~|~Plan split for roadway work 87761~|~1~|~2~|~02/NFP~|~Water Works portion of project 87761~|~1~|~1~|~01/SAF~|~Widen for two way left turn lane, left turn lanes at intersections, from Branch Hill Guinea Pike to Smith Road. Bridge CLE-28-0557 (SFN 1300032) will be widened for the project. 105417~|~1~|~1~|~01/IMS~|~Bridge repair/rehab on Interstate bridges. 105417~|~1~|~2~|~02/NHS~|~Bridge rehab/repair on NHS bridges. 105417~|~1~|~4~|~04/S>2~|~Bridge rehab on large urban bridge. 105417~|~1~|~3~|~03/S<2~|~Bridge repair/rehab on small urban bridges. 105417~|~1~|~5~|~05/NHS~|~Bridge collision repair(Insurance claim to be created - separate plan split needed to track total costs for insurance claim). 112654~|~1~|~1~|~01/MPO~|~Resurfacing of Hoagland-Blackstub Rd from SR 5 to Everett-Hull Rd. 100558~|~1~|~1~|~01/STR~|~plan split for work in the Rural sections on PRE-35 100558~|~1~|~2~|~02/STR~|~Plan Split for the Rural sections on PRE-122 which includes edge replacement using M2 funds 100558~|~1~|~3~|~03/S5K~|~Plan Split for the Small Urban sections on PRE-122 which includes edge replacement using M2 funds 100929~|~1~|~1~|~01/S>2~|~Relocation and extension of Shakertown Road from Greystone Drive to Factory Road and realigment of Alpha Belbrook Road to intersect Shakertown Road west of Factory Road. The existing intersection of Shakertown Road and US-35 will be eliminated as a result of this work, consistent with the proposed improvements to US-35 (PID 80468). Shakertown Road will be constructed as a two-lane roadway and Alpha Bellbrook Road will be constructed as a three lane roadway. 124489~|~1~|~1~|~01/S>2~|~Pedestrian improvements 103573~|~1~|~1~|~01/NFA~|~The Township will improve and widen 3 miles of Bockey Road between State Road and Old Lincoln Hwy to support the growth of D&D Ingredients 76436~|~1~|~1~|~01/MPO/NEWF~|~Plan Split for SUM SR 619 4.73 to 5.01 widening 110942~|~1~|~1~|~01/NHS~|~Resurfacing work on the NHS 110942~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. 116444~|~1~|~1~|~01/S>2~|~Districtwide signal installation and repairs. 111622~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout ATB, MAH and TRU counties. 101425~|~1~|~1~|~01/IMS~|~CO CO Contr 01 plan split created for the following Interstate routes: FRA-670-0.00-5.34/10.21-10.39 101425~|~1~|~2~|~02/IMS~|~CO CO Engr 01 plan split created for the following Interstate routes: FRA-670-0.00-5.34/10.21-10.39 102379~|~1~|~1~|~01/NFP~|~District 10 two year mowing project for CY 2022-23 along Interstates and Interstate look-a-likes (4 LN). Funded 100% state. 102969~|~1~|~1~|~01/NHS~|~Microsurfacing on NHS route: MOT SR 741 SLM 4.56 to 6.20. 100596~|~1~|~1~|~01/STR~|~Microsurfacing of SR 149 and SR 331 105016~|~1~|~1~|~01/STR~|~Landslide repair project. VIN 327 3.21-3.28. Rural other federal aid funded 80 federal/20 state GSM. 101058~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay to ATB US 322 from 15.24 to 17.49, ATB SR 307 from 17.07 to 18.13 and 19.88 to 20.67. 111644~|~1~|~1~|~01/NFA~|~Landslide repair project. WAS 676 2.50. GSM funded. Not on the federal aid system funded 100 State. 101909~|~1~|~1~|~01/SAF/LCEO~|~CEAO HSIP Funding - 4HB7 (100% Federal) - See CAP Comments - Pavement Marking upgrade on various County Routes County wide 115897~|~1~|~1~|~01/MPO~|~Plan split for eligible MPO funded work. 120925~|~1~|~1~|~01/SAF~|~Traffic Signals. 95281~|~1~|~1~|~01/IMS~|~Project includes hazardous cargo detour signing around Lytle Tunnel. 96618~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7. 96129~|~1~|~1~|~01/NFA~|~Facilities contract for UST removal 98526~|~1~|~1~|~01/NFP~|~Systematic Sign Replacement 120841~|~1~|~1~|~01/S5K~|~added plan split. 105403~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS route bridges. 105403~|~1~|~2~|~02/IMS~|~Bridge rehab on Interstate bridges. 88883~|~1~|~2~|~02/STR~|~Costs to hang sanitary sewer in place- Medina county to be billed. 88883~|~1~|~1~|~01/STR~|~MED-SR-252 03.990 SFN 5206871 (Over W BRANCH ROCKY RIVER) New Construction ? Structure(repl) (002) 91315~|~1~|~1~|~01/IMS~|~Priority system paving of FRA-270: 2.60-9.63 97473~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-CR 13-46(Green Valley Road) SFN 4234308 - BR Eligible for replacement: L=85'; SD/FO=1; SR=31.0; DSR=5; 97473~|~2~|~2~|~02/BRF/KCEO~|~"02/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-TR 365-41 (Dean Road) SFN 4237579 - BR Eligible for replacement: L=63'; SD/FO=2; SR=37.0; DSR=5; 97473~|~3~|~3~|~03/BRF/KCEO~|~"03/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-TR 399-10 (Hyatt Road) SFN 4237080 - BR Eligible for replacement: L=120'; SD/FO=1; SR=20.5; DSR=6; 92023~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. 1809504 93518~|~1~|~1~|~01/SAE~|~100% Federal Highway Safety Improvement Program funding for upgrading the non-compliant end terminals on top 100-150 locations on remaining high volume routes state routes under ODOT jurisdiction. 81711~|~1~|~1~|~01/NHS~|~Remove and replace reinforced concrete deck on bridge (HAS-151-2310, SFN 3402312). Paint/replace structural steel and raise bridge to meet current design standards. Also, provide new approach slabs. 93469~|~1~|~1~|~01/IMS~|~Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum. 93469~|~1~|~2~|~02/ENH~|~88][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Retrieved criteria from user's session: null2012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Retrieved criteria from user's personalization: null2012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Made brand new criteria: us.oh.state.dot.ellis.projects.ProjectSearchCriteria@687ad7782012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Retrieved quick search criteria from personalization: 12012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0 120717~|~1~|~1~|~01/STR~|~Bridge deck replacement project. WAS 339 1.24, SFN 8403996. Funded 80 Federal/20 State. 99710~|~1~|~1~|~01/NFP~|~Raised pavement markers along various routes throughout District Four. 97498~|~1~|~1~|~01/BRO~|~Rehabilitate existing bridge carrying SR 800 over Weaver's Run by replacing the deck slab and abutment breastwalls. The pier piling will also be encased. In stream work is required. 106504~|~1~|~1~|~01/IMS~|~Repair PRE-70-0827 culvert 106504~|~1~|~2~|~02/STR~|~Replace small culverts PRE-35-0684 and PRE-177-0069 124015~|~1~|~1~|~01/IMS~|~plan split to construct the stream protection 102005~|~1~|~1~|~01/NFA~|~Culvert replacement on HIG 785 2.67. 92644~|~1~|~1~|~01/MPO~|~Highland Ave CR98 0.00-2.23 115497~|~1~|~1~|~01/NFA~|~Guilford Lake Camp Area resurfacing 102252~|~1~|~1~|~01/STR~|~This plan split is for STP rural 113128~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment 106463~|~1~|~1~|~01/BRO~|~Replacement of the existing deficient bridge and improvements to geometry and sight distance on the southwest approach to the bridge. 109134~|~1~|~1~|~01/NFA~|~Landslide repair project. MEG 143 9.20. 93688~|~1~|~1~|~01/NFP~|~District Preservation Program funds - 100% state funds - No CAP - Resurfacing on PAU-49/613-5.78/0.00/6.08 117430~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 96866~|~1~|~1~|~01/ENH~|~Construction of a pathway near Ellsworth Hill Elementary School in the City of Hudson, Summit County, Ohio. 94787~|~1~|~1~|~01/NHS~|~Place pipe liner in existing deep fill twin concrete culverts on SFN 0600431 AUG 66 2051 over branch of Blackhoof Creek. SFN overall lingth is only 12 ft. 107325~|~1~|~1~|~01/NFP~|~Split for sign structure work 107325~|~1~|~2~|~02/SAF~|~Split for improved signing to IR77 north and south (CUY-IR-480; 18.45 to 20.32) 122275~|~1~|~1~|~01/BRF~|~CO Contr 01 CEAO LBR funds plan split, Shayler Rd Bridge 117921~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-H 108351~|~1~|~1~|~01/MPO~|~Construction of bike lanes in the City of Dayton. 95980~|~1~|~1~|~01/NFP~|~Design and construction of new facility at Grafton outpost building. 90243~|~1~|~1~|~01/MPO~|~MORPC/Delaware County pavement widening of S Old State Road 90243~|~1~|~2~|~02/MPO~|~Fiscal Year 2020 MORPC Construction Contract costs 90243~|~1~|~3~|~03/MPO~|~MORPC Construction costs for FY 2021 121317~|~1~|~1~|~01/STR~|~added STP Rural plan split. 102655~|~1~|~1~|~01/S<2~|~Bridge Culvert Liner: LOR-SR -0611-00.05 (SFN 4707435) 102655~|~1~|~2~|~02/NHS~|~Bridge Culvert Liner LOR US 0006-06.86 (SFN 4707532), Bridge Deck Replacement on LOR US 0006 06.83 (SFN 4707508) 95357~|~1~|~1~|~01/NFP~|~Construction of salt building, Rootstown Township, Portage County, Ohio. Funded with Central Office Facilities dollars. Will eventually be transferred to D-4 budget. 95357~|~1~|~2~|~02/NFP~|~Construction of driveway and parking lot. Funded with District 4 Facilities dollars. 108869~|~1~|~1~|~01/NFP~|~The PORT AUTHORITY will contract for transportation engineering services to study access conditions on Fayette Township Rd. 1429 East, Sandusky Rd. and US-52 intersection and recommend improvements with estimated costs 96137~|~1~|~1~|~01/NFA~|~Construct two (2), 1,000 ton salt storage buildings at the ODOT Clark County Full Service Facility. 115571~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 88797~|~1~|~1~|~01/STR~|~Resurfacing 81722~|~1~|~1~|~01/NHS~|~Resurfacing of SR 7 81722~|~1~|~2~|~02/NFA~|~Resurfacing Park & Ride at SR 213 81722~|~1~|~3~|~03/NFA~|~Resurfacing SR 7/SR 213 Rest Area 81722~|~1~|~4~|~04/NHS~|~Bridge deck sealing select bridges on SR 7. 93373~|~1~|~1~|~01/NHS~|~Priority system paving of FRA-161: 15.06-17.30 111634~|~1~|~1~|~01/STR~|~Reconstruct the profile along County Road 82 and County Road 80/Township Road 378 to improve the visibility of the intersection at County Road 82 and County Road 80/Township Road 378 106300~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4. 107302~|~1~|~1~|~01/CMQ~|~Conversion of two existing T-intersections, US-42 with (1) Bethany Road, and (2) Mason Morrow Millgrove Road to modern roundabouts. Construction of a shared use path from Bethany Road, along US-42, connecting with the City of Mason Sports Park on Mason Morrow Millgrove Road. 95843~|~1~|~1~|~01/IMS~|~Spot paving and resurfacing to repair damaged pavement from the winter season. Miami County SLM 14.15 to 19.95/ Shelby County SLM 0.00 to 8.88. 82388~|~1~|~2~|~02/IMS~|~Split for the bridge portion of the project 82388~|~1~|~1~|~01/IMS~|~Split for the pavement portion of the project 111047~|~1~|~1~|~01/ERD~|~Plans split for remaining Earmark FB1102 funds 102540~|~1~|~1~|~01/IMS~|~Rehabilitate or replace 14 structures on IR-77. 92788~|~1~|~1~|~01/SAF~|~For LUC-20A-2.23, LUC-120-11.15 and WOO-51-3.23 92788~|~1~|~2~|~02/NFP~|~This split is for the differential cost between decorative pole and generic. 113149~|~1~|~1~|~01/STR~|~Resurfacing. 113149~|~1~|~2~|~02/STR~|~Minor bridge work. 113149~|~1~|~3~|~03/STR~|~Minor bridge work, 10 to 20' structure. 90863~|~1~|~1~|~01/NFA~|~Plan split. Remove debris from channel. 120040~|~1~|~1~|~01/S5K~|~plan split. 122867~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement. 122867~|~1~|~3~|~03/IMS~|~Bridge replacements. SFN 7703570 replaced by SFNs 7703571 and 7703576, SFN 7705859 replaced by SFN 7703572, SFN 7705883 replaced by SFN 7703574. 122867~|~1~|~4~|~04/IMS~|~Bridge deck replacements and widening. 122867~|~1~|~2~|~02/IMS~|~Widening for additional lane. 122867~|~1~|~5~|~05/NFA/AKRO~|~New waterline installation long Jason Ave and I-76 paid by Akron. 119902~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-B 88763~|~1~|~2~|~02/STR~|~Bridge portion of project 88763~|~1~|~1~|~01/STR~|~Resurfacing portion of project 104893~|~1~|~1~|~01/S<2~|~This plan split is for the Urban portion of the project. 124636~|~1~|~1~|~01/SAE/FAY~|~Intersection improvement (roundabout) at the intersection of SR41 and CR27 in Fayette County to improve safety. 114658~|~1~|~1~|~01/STR~|~Project to Insert structural liner into bridge size culvert CLI-68-0942 that carries US 68 over a tributary to Cowan Creek 97806~|~1~|~1~|~01/IMS~|~Mowing various locations in COL, HAS and JEF counties. 100745~|~1~|~1~|~01/BRO~|~Funding from district bridge allocations using SACs 4PF7 and 4PS7 to replace the box beams on structure WYA-53-6.20. 123731~|~1~|~1~|~01/NHS~|~Plan split for all resurfacing work on US-6 90443~|~1~|~1~|~01/MPO~|~Minor rehabilitation 124386~|~1~|~1~|~01/SAF~|~Federal 98744~|~1~|~1~|~01/BRO~|~100% State funding for temporary repairs to Hawthorn Parkway over US-422 bridge. 100617~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of roadway work on US 42 from SLM 5.92 - 9.54. This is the 100% ODOT portion 100617~|~1~|~2~|~02/S>2/MASN~|~Urban Paving portion of US 42 in the newly annexed section between SLM 5.17-5.41. This is the 80/20 split. 109210~|~1~|~1~|~01/S<2~|~Construction Inspection 109210~|~1~|~2~|~02/S<2~|~Construction Inspection 109210~|~1~|~3~|~03/S<2~|~Construction Inspection 105581~|~1~|~1~|~01/STR~|~UNI 31 from 7.79 to 15.65 UNI 347 from 8.26 to 15.23 100500~|~1~|~3~|~03/S<2~|~100% Local for Curb ramps and Full Depth repairs 100500~|~1~|~1~|~01/S<2~|~JAC 93 (15.40-15.58) 100500~|~1~|~4~|~04/S<2~|~Bridge maintenance 100500~|~1~|~5~|~05/NHS~|~JAC 93 15.48 (SFN 4001206) 100500~|~1~|~2~|~02/S<2~|~JAC 93 (15.58-16.63) (16.80-17.46) Local MatchJAC 139 15.29-15.60 100500~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 107761~|~1~|~1~|~01/MPO~|~Signal upgrades on various routes throughout the city. 112268~|~1~|~1~|~01/IMS~|~Added plan split 101141~|~1~|~1~|~01/STR~|~DSR# BEL-016 80109~|~1~|~1~|~01/NHS~|~NHS funding for minor rehab of UNI-33, 12.59-25.11 and asphalt OL's on 4 structures:SFN 8001537, UNI-33-23.57R, Kile DitchSFN 8001502, UNI-33-23.57L, Kile DitchSFN 8001561, UNI-33-24.89L, SR-161SFN 8001596, UNI-33-24.89R, SR-161 115432~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - superstructure replacement on SFN 4203119, KNO SR 514 4.97. 95298~|~1~|~3~|~03/S<2/HAN~|~Work of the portion of Sixth Street/CR 290 which is outside the City of Findlay. Work is still inside the Findlay Urban Area. Federal funds from the City of Findlay's "Large Cities" budget with the 20% match provided by the Hancock County Engineers office. South side of road from Amelia Avenue to Williams Street and both sides of the road from Williams Street to Blanchard Avenue. 95298~|~1~|~1~|~01/NHS/FIND~|~Work on Main Street. Main Street is a Urban Principal Arterial. MAP-21 expanded the National Highway System (NHS) to incorporate principal arterials not previously included. Federal funds from the City of Findlay's "Large Cities" budget with the 20% match provided by the City of Findlay. 95298~|~1~|~2~|~02/S<2/FIND~|~Work on streets not on the NHS. West Sandusky Street and Sixth Street. Federal funds from the City of Findlay's "Large Cities" budget with the 20% match provided by the City of Findlay. All the work on West Sandusky Street and all the work on Sixth Street between South Main Street and Park Avenue is in this split. The work on the north side of Sixth Street between Amelia Avenue and Williams Street is also in this split. 120373~|~1~|~1~|~01/ENH~|~Construct bridges on existing substructures for the Moonville multi-use trail. Funded 80% Federal TAP/20% Federal Safety. 114806~|~1~|~1~|~01/NFA~|~Not on federal aid system plan split. 114806~|~1~|~2~|~02/S<2~|~WCH Urbanized area plan split. 114806~|~1~|~3~|~03/STR~|~Rural plan split. 114158~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2027. 108022~|~1~|~1~|~01/MPO~|~Resurfacing within the City of West Carrollton. 115798~|~1~|~1~|~01/IMS~|~Construction of left turn lane on the westbound exit ramp and a new right turn lane on the eastbound exit ramp at the IR 76 and Bailey Rd Interchange. 115798~|~1~|~2~|~02/IMS~|~Installing new signals at the MAH-IR 76/Bailey Rd interchange. 102491~|~1~|~1~|~01/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Spot Paving and repairs on selected IMS - Interstate routes in District 5 102491~|~1~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Spot Paving and repairs on selected OFRAH-Rural routes in District 5 102491~|~1~|~3~|~03/NFA~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Spot Paving and repairs on selected NFA - Rural routes in District 5 102491~|~1~|~4~|~04/NHS~|~Plan Split 04/NHS/OT/ - District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Spot Paving and repairs on selected NHS routes in District 5 86923~|~1~|~1~|~01/S>2/Barb~|~Widening 31st street from Wooster Road to Shannon Avenue for the addition of a TWLTL including signal upgrade for the Shannon Avenue intersection, in the City of Barberton, Summit County, Ohio. 91948~|~1~|~1~|~01/IMS~|~100% State Maint. Funds for 1 year 114734~|~1~|~1~|~01/NHS~|~FY 25 Overlay 114734~|~1~|~2~|~02/NHS~|~Added bridges 111274~|~1~|~1~|~01/NFA~|~ODNR Tar Hollow State Forest. 90914~|~1~|~2~|~02/STR~|~Bridge Replacement HUR-SR-13-2.47 90914~|~1~|~1~|~01/NHS~|~Bridge Replacement ASD-250-24.67 (west of TR 35) 87702~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 99792~|~1~|~1~|~01/BRF~|~CEAO/MRW County funding for bridge replacement 111050~|~1~|~1~|~01/SAF~|~Construct roundabout at Strausser St (CR 231) and Lake O Springs Ave (TR 227). 83056~|~1~|~1~|~01/STR~|~SR131 0.00 - 7.06 Minor Rehab - Resurfacing ProjectBeginning at the Brown County Line, head east and terminate at SR138, it is proposed to resurface the highway with asphalt concrete.Pave thru these two bridges.3602168 1.210 3602257 83056~|~1~|~2~|~02/STR~|~On bridge 3602206, 1.540, & bridge 3602222, 3.850, it is proposed to perform minor rehab and deck sealing. 108864~|~1~|~1~|~01/NFP~|~The COUNTY will construct a new left turn lane going north on SR 61. Additionally, going south on SR 61 a right turn lane will be positioned directly across from Bennington Glen headed north on SR 61 108035~|~1~|~1~|~01/NHS~|~Bridge Rehab 108745~|~1~|~1~|~01/NFP~|~D09 Bridge Maintenance FY25 105888~|~1~|~1~|~01/S>2~|~Split for urban paving work 116076~|~1~|~1~|~01/NHS~|~Bridge liner 97988~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of SFN 4505018 ; Lic-SR 79-19.91 carrying SR 79 over Wilkins Run 114814~|~1~|~2~|~02/STR~|~Rural plan split. 114814~|~1~|~1~|~01/S5K~|~STP>5,000 Plan SPlit 108862~|~1~|~1~|~01/NFA~|~Guardrail replacement project. VIN CR 19 0.00-0.50. CEAO Funded 100% federal. 110296~|~1~|~1~|~01/S<2~|~Slide repair on BRO 41 1.59 90807~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on LOG US 68 SLM 8.10 to 8.49 and SLM 8.68 to 9.77 (segment length 1.09 Total Lane Miles 2.18). Urban Paving Program. 90807~|~1~|~5~|~05/STR~|~Deck waterproofing and overlay remove and replace on SFN LOG-235-0953, LOG-235-1358, LOG-235-1536. 90807~|~1~|~2~|~02/S<2~|~Pavement planing and resurfacing with asphalt concrete on LOG US 68 SLM 9.77 to 10.09 (segment Length 0.320 Total Lane Miles 0.640) . 90807~|~1~|~4~|~04/BRO~|~Remove and replace deck overlay with waterproofing and concrete. SFN 4601564. LOG-68-0979. 90807~|~1~|~3~|~03/STR~|~Resurface the existing roadway along with other roadway related items on LOG SR 235 from SLM 8.18 to 17.43 segment length 9.25 total lane miles 18.50. 106241~|~1~|~1~|~01/NFP~|~plan split 124637~|~1~|~1~|~01/SAF~|~Upgrade guardrails on county roads 106356~|~1~|~1~|~01/NFA~|~Culvert Replacement 105525~|~1~|~2~|~02/S<2~|~Work that is inside the Ada Urban Area. Work on SR 235 in Hardin County from the boundary of the Ada Urban Area boundary at 16.796 to the north corporation limits of the Village of Ada at 19.26. Work on SR 81 in Hardin County on both sides of the road from where the road enters the Village of Ada on the right side at 2.25 to where it leaves the Village of Ada on the right side at 3.98. All funds from the District Preservation Program budget. No local funds. 105525~|~1~|~1~|~01/STR~|~Work on SR 235 in Hardin County from SR 309 at 15.99 to the boundary of the Ada Urban Area boundary at 16.796. All funds from the District Preservation Program budget. No local funds. 105525~|~1~|~3~|~03/NFA~|~Work on SR 701 in Hardin County from the junction with SR 309 at 0.00 to the junction at US 68 at 8.93. All funds from the District Preservation Program budget. No local funds. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds. 105525~|~1~|~4~|~04/NFP/ADA~|~Work funded 100% by the Village of Ada. Costs to pave driveways and alleys back to the sidewalks where the driveways and alleys are not currently paved. 117350~|~1~|~1~|~01/NFA~|~Bridge Replacement 88825~|~1~|~1~|~01/NHS~|~Bridge Repair 123387~|~1~|~1~|~01/STR~|~Resurfacing SR 39 116618~|~1~|~1~|~01/NHS~|~All work 85134~|~1~|~1~|~01/NHS~|~Minor pavement rehab on US 27 from Millville to north of the RR track 102150~|~1~|~1~|~01/STR~|~Bridge replacement JAC SR 124 23.41 (SFN 4002407) 100878~|~1~|~1~|~01/STR~|~Chip seal on DEL-257, MAR-203, MAR-257, MRW-19, MRW-314, and MRW-656. 100878~|~1~|~2~|~02/NHS~|~Work on DEL-23 CD Roads 121166~|~1~|~1~|~01/STR~|~All Work is in this split 90785~|~1~|~1~|~01/MPO~|~Widen from four lanes to five lanes with the center 12' lane functioning as a two-way left turn lane. Project also includes curb and gutter, sidewalks, closed storm darinage, public and private utility relocations and conventional street lighting. 103641~|~1~|~1~|~01/STR~|~DSR# BEL-013 123127~|~1~|~1~|~01/IMS~|~Deck overlays on 84763~|~1~|~1~|~01/BRF~|~"01/BRF/BR/COL" - COL CR 421 0.74 replace existing 3 span bridge over Youngstown & Southern Railroad; ~0.10 mile S of TR885; project length is 0.19 mile; includes horizontal realignment improve curvature, guardrail, curbing, drainage, striping and signing. OBPP funding at 100%. 84819~|~1~|~1~|~01/BRF~|~Remove existing bridge and place a new precast, reinforced, concrete culvert structure whil completing associated roadway approach construction in Mercer County TR 131A on Stose Road. SFN 5433452 MER TR 131A 0603 88876~|~1~|~1~|~01/NHS~|~District Allocation 106237~|~1~|~1~|~01/NHS~|~Replace bridge carrying SR 7 over Us 250, US 40, and SR 7 ramps and Wheeling Creek. 113117~|~1~|~1~|~01/IMS~|~Split for resurfacing work 85397~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for Urban Paving funds 85397~|~1~|~2~|~02/S>2~|~Plat for non-eligible Urban Paving items at 100% Local 97795~|~1~|~1~|~01/IMS~|~SFN 5705193 BR. No. MOT-70-0708 (Kimmel Road) - Replace bridge deck, convert to semi-integral abutments and patch substructure. 107234~|~1~|~1~|~01/S>2~|~Items related to safety improvement to include signal modifications, pavement markings, and the addition of a westbound left turn lane. 107234~|~1~|~2~|~02/S>2~|~Reconstruct the pavement at the intersection. 120456~|~1~|~1~|~01/S>2~|~Sidewalk improvements on Noe Bixby Rd, Winchester Pike, Dempsey Rd 116419~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 105911~|~1~|~1~|~01/IMS~|~Split for work to install VSL signs 101386~|~1~|~1~|~01/STR~|~STP Rural Pavement Replacement 117347~|~1~|~1~|~01/SAF/CAMB~|~Repair and/or replacement of sidewalk facilities along Clairmont Avenue from 10th Street to Clark Street 91888~|~1~|~2~|~02/SAF/BCWS~|~Plan split for 100% locally funded waterline upgrades within the project limits. 91888~|~1~|~1~|~01/SAF~|~Address angle crashes at the existing two way stop controlled intersection of SR-748 and Layhigh by constructing a roundabout and cul-de-sac'ing Kirchling Road at SR-748. 94637~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split using MPO STP funds for the Turney Road resurfacing. 94462~|~1~|~1~|~01/STR~|~District Wide Pavement Marking 19837~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 1) 6002285 MUS IR70 0.59 Intersect: CR 30 Mt Perry Rd; BR Eligible for Rehabilitation: Length=241 SD/FO(2) SR=70 DSR=5; 110478~|~1~|~1~|~01/SAF~|~Grade Separation overpass on BRO 32 & Brooks Malott Rd. 110478~|~1~|~2~|~02/NHS~|~Overlay on 32 110478~|~1~|~3~|~03/SAF~|~Recessed Wet Reflective Pavement Markings 110478~|~1~|~4~|~04/NFP~|~Plan split added for alternates. Priority #1 is 100 percent local funds and priority #2 is federal/state funds. 116278~|~1~|~1~|~01/S50~|~Microsurfacing 93375~|~1~|~1~|~01/BRO~|~80% federal / 20% local split using CEAO LBR funds to demo the St. Clair Street bridge. 86212~|~1~|~1~|~01/IMS~|~Asphalt overlay and patching on structure FRA-270-5.63 (SR 104 over IR 270) SFN 2508583Replace approach guardrail 112177~|~1~|~1~|~01/NHS~|~Culvert repair and replacements. 112177~|~1~|~2~|~02/S>2~|~Culvert repair and replacements. 112177~|~1~|~3~|~03/STR~|~Culvert repair and replacements. 95955~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority 121192~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings, and school zones throughout the District. 113612~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 119157~|~1~|~1~|~01/IMS~|~Interstate Plan Split 79736~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 106290~|~1~|~1~|~01/BRF~|~All costs to replace the bridge. Federal funds from Municipal Bridge Program. Toll Revenue Credit is being used. The portion of the match not covered by Toll Revenue Credit and any funds needed after the cap is reached are the responsibility of the Village of Carey. 100734~|~1~|~1~|~01/BRO~|~01/BRO/BR/- District Preservation 4PF7/4PS7 (80/20) - No Cap - Bridge Number WYA-53-2185; SFN 8801924 109432~|~1~|~1~|~01/MPO~|~Construct bike path - Clark County Park District 116963~|~1~|~1~|~01/NHS~|~Culvert liner project. HOC 33 10.12 (CFN 1879194). NHS route funded 80 Federal/20 State. 95481~|~1~|~1~|~01/NFP~|~100% state funds using the District Preservation Program SAC 4PS7. 97558~|~1~|~1~|~01/STR~|~CR 2 15.62 (SFN 0132160) 97558~|~1~|~2~|~02/STR~|~CR 3 7.91 (SFN 0130621) 97558~|~1~|~3~|~03/STR~|~TR 11 1.73 (SFN 0135216) 92745~|~1~|~1~|~01/NFA~|~Landslide repair project funded by GSM program. MOE 255 11.75-11.85. 100% State. 116403~|~1~|~1~|~01/STR~|~"01/STR/BR/ " 80% Federal (4PF7) and 20% State (4PS7) - replacement of PER-155-07.42 (SFN 6401988). 92171~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance Funds for one year Electrical Maintenance Contract 102833~|~1~|~1~|~01/NHS~|~Resurfacing various NHS routes with asphalt 102833~|~1~|~2~|~02/IMS~|~Resurfacing various Interstate routes with asphalt 102833~|~1~|~3~|~03/STR~|~Resurfacing various STP Rural routes with asphalt 124338~|~1~|~1~|~01/NFA~|~Bike path 105147~|~1~|~1~|~01/BRO~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 92882~|~1~|~1~|~01/NHS~|~100% City of Bellevue 92882~|~1~|~2~|~02/NHS~|~Urban Paving - 80/20 - District Allocation/City of Bellevue 92882~|~1~|~3~|~03/NHS~|~Concrete Pavement Repairs - 50% Federal/50% City of Bellevue 92882~|~1~|~4~|~04/NHS~|~SAN US 0020 33.56-64 Resurfacing 122875~|~1~|~1~|~01/NFP~|~All work included in this plan split. 100994~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. 93829~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: Located 5.41 miles west of SR772 on SR124 Project Description: It is proposed to replace the structure, SFN 6601294 on SR124. 80/20 split01/STR/BR/State 105023~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 821 18.31-18.36. GSM funds. Rural other federal aid funded 80 federal/20 state. 91924~|~1~|~2~|~02/NHS~|~Repair the inlet side of the bridge culvert (SFN 7101694).80/20 02/NHS/BR/State 91924~|~1~|~1~|~01/NHS~|~Culvert ReplacementOn US35, 0.85 mile south east of the Ramp A from SR138, it is proposed to replace the culvert @ 5.80.80 Fed/20 State01/NHS/OT/State 98857~|~1~|~1~|~01/ENH~|~This project consists of construction of a bike path to connect an existing bike path at Fleckenstein Park and extend it south, 500? along the east side of Mason-Montgomery Road to a path that terminates about 500? north of Bethany Road. In addition, extend the bike path 3,100? eastward along the north side of Bethany Road to an existing path at Windemere Way. 121870~|~1~|~1~|~01/STR/PHIL~|~Sidewalk and curb ramps in Village of Philo along Old River Rd (CR 6) from Bridge Street to 2nd Street. TAP Funded - Carbon Reduction / Safety $350,000 Construction Phase at 80% 4CT7/20% 4HJ7 111183~|~1~|~1~|~01/S5K~|~Bridge replacement. 94371~|~1~|~1~|~01/BRF~|~Bridge replacement using 95% federal funding (80% from CEAO LBR funding and 15% Credit Bridge Program credit) with 5% Local matching funds. 110705~|~1~|~1~|~01/NHS~|~All items of work associated with spot repair. 105058~|~1~|~1~|~01/ENH~|~Construction of a sidewalk along Bassett Road from Fairbanks Avenue to Elberon Avenue. 93723~|~1~|~1~|~01/NFA~|~Scioto County Engineer 93723~|~1~|~2~|~02/NFA~|~Scioto County Engineer 88683~|~1~|~1~|~01/STR~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete from the MIA/CHP County Line (SLM 0.00) to the Junction of SR 560 CHP SR 55 0.00 to 11.65. 101219~|~1~|~2~|~02/STR~|~Resurfacing STP Rural eligible portion of US 127. 101219~|~1~|~1~|~01/NHS~|~Resurfacing NHS eligible portion (WIL-127-1.05 to 1.94). 116761~|~1~|~1~|~01/NFP~|~Created for J&C involvement 108953~|~1~|~1~|~01/NFA~|~Construction of the Hampton Hills Bike Trail. 110145~|~1~|~1~|~01/CMQ~|~Signal equipment upgrade eligible for federal-aid 110145~|~1~|~2~|~02/NFP~|~Work that is not eligible for federal-aid 92813~|~1~|~1~|~01/SAF~|~Construct five foot paved shoulders (8 foot width) along CR 385 (Derr Road) from SLM 1.00 to 3.40 and also install a NB right turn lane at Kinsgate Drive, install a NB right turn lane at Montego Drive, and install a traffic signal at Montego Drive 114827~|~1~|~1~|~01/STR~|~Items of work associated with bridge repair 120433~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State 87723~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 101536~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County. 100490~|~1~|~1~|~01/STR~|~SCI CR 10 FLAP Phase 3 (0.00-1.40) 100345~|~1~|~2~|~02/S<2~|~Work on SR 66 inside the Defiance Urban Area but outside the City of Defiance. All work on the left side of the road from the Defiance Urban Area boundary at Watson Road (2.01) to Carter Road (3.05). Work on the right side from 2.01 to 2.20 and from 2.31 to 2.39. All funds from the District Preservation Program budget. No local funds. 100345~|~1~|~1~|~01/STR~|~All work on SR 2 and SR 18 and the work on SR 66 from the Defiance/Paulding County line to the Defiance Urban Area boundary at Watson Road which is CR 17 and at 2.01. All funds from the District Preservation Program budget. No local funds. 100345~|~1~|~3~|~03/S<2/DEF~|~Work on SR 66 inside of the City of Defiance. Work on the right side of the road from 2.20 tp 2.31 and from 2.39 to Carter Road (3.05). Federal funds are from the District Preservation Program budget. The 20% non-federal match is provided by the City of Defiance. 115852~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2029. 100611~|~1~|~1~|~01/BRO~|~Sealing of bridge decks througout the District at various locations 96673~|~1~|~1~|~01/IMS~|~Structural steel painting 107845~|~1~|~1~|~01/STR~|~District preservation funds. 113058~|~1~|~1~|~01/NFA~|~Replacing twin 9' culverts on N Poplar St in the Village of Jefferson. 106232~|~1~|~1~|~01/ENH~|~The Drainage Construction will begin just south of the intersection/roundabout at MED SR 57 SLM 17.65. 106232~|~1~|~2~|~02/ENH~|~construction funding event for the water line work associated with this project. This will be paid 100% by the Medina County Sanitary Engineer 123669~|~1~|~1~|~01/BRF~|~All Work is within this split 95535~|~1~|~1~|~01/STR~|~General System Resurfacing to include asphalt overlay, pavement marking and pavement repairs on SR 9. 97676~|~1~|~1~|~01/SAF~|~90% federal/ 20% state utilizing safety funding all eligible work excluding CE. 121301~|~1~|~1~|~01/NFP~|~GR plan split. 108883~|~1~|~1~|~01/NFP~|~TID will construct the Chamberlain Road project as described in the TID?s SFY19 ODOT Funding Application to repair the roadway to ensure that it is capable of providing a smooth and safe movement of trucks. 104797~|~1~|~1~|~01/NFA~|~plan split 98825~|~1~|~2~|~02/NHS~|~Split for resurfacing work using MPO funding 98825~|~1~|~1~|~01/NHS~|~Split for the concrete pavement portion of the project using district allocation 105704~|~1~|~1~|~01/SAF~|~plan split 114204~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 145 0.00-8.94 and WAS 145 0.00-3.25. 114204~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 113600~|~1~|~1~|~01/S>2~|~Intersection improvement at Red Bank & Colbank in the Village of Fairfax (Alternative E1) 103884~|~1~|~1~|~01/SAF~|~Work to widen the shoulders that is eligible for safety funds. 103884~|~1~|~2~|~02/STR~|~Split for resurfacing work on the existing pavement. 112121~|~1~|~1~|~01/S>2~|~Widening of SR 63 in Warren County between Union Road and east of the SR 741 Intersection. 112121~|~1~|~2~|~02/NFP/ODRC~|~Construction of a new access drive for Warren Correctional Institution (WCI), to be funded by ODRC and constructed as Part 2. 93136~|~1~|~2~|~02/NHS/COL~|~FRA-33 paving, SLM 10.79-11.20Columbus urban paving 93136~|~1~|~3~|~03/NHS/UARL~|~FRA-33 paving, SLM 11.20-11.37Upper Arlington urban paving 93136~|~1~|~1~|~01/NHS~|~FRA-33 paving, SLM 9.33-10.79D6 federal/state funding 93136~|~1~|~4~|~04/NHS~|~!00% City of Columbus items (ie pavement repair, curb ramps, etc.) 93136~|~1~|~5~|~05/NHS~|~100% City of Upper Arlington items (ie pavement repair, curb ramps, etc.) 83573~|~1~|~1~|~01/STR~|~Replace deficient culvert over Coldwater Creek on State Route 119 at 0.05 mile West of Junction of State Route 118 SFN 5402050 MER SR 119 0957. 95225~|~1~|~1~|~01/SAF~|~100% CEAO Safety funding for guardrail replacement on various county roads. 104812~|~1~|~1~|~01/S<2~|~Construction Inspection 101112~|~1~|~1~|~01/SAE~|~Traffic signal with pedestrian crossing work items eligible for SRTS funding. 107788~|~1~|~2~|~02/S<2~|~Resurfacing: LOR-301-19.54 to 21.80 LOCAL 100% 107788~|~1~|~3~|~03/S<2~|~Resurfacing: LOR-301-21.80 to 22.33 FED/STATE 80/20 107788~|~1~|~1~|~01/S5K~|~Resurfacing: LOR-301-19.54 to 21.80 FED/LOCAL 80/20 109028~|~1~|~1~|~01/ENH~|~Plan Split for TA funds 87717~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 83343~|~1~|~1~|~01/BRF~|~This split is for work to replace a bridge not on a federal aid route. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge can use the federal off system BR funds. 115142~|~1~|~1~|~01/S>2~|~Replace culverts 115142~|~1~|~2~|~02/STR~|~Replace Culverts 119361~|~1~|~1~|~01/IMS~|~R/W Fence Replacement on LOR-90-10.76 to 18.611 123931~|~1~|~1~|~01/NHS~|~All work included in this split. 104059~|~1~|~1~|~01/NFA~|~Landslide repairs at 4 locations. 107612~|~1~|~1~|~01/NHS~|~Plan split for WIL-6-1107 bridge replacement 99995~|~1~|~1~|~01/IMS~|~Split for bridge sealing work on all structures 99913~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for pavement markings 98906~|~1~|~1~|~01/NFP~|~Landslide repair project. GAL SR 588 11.43-11.45 in the City of Gallipolis. TID funded project. Agreement number 18613. Funded 100% state TID funds. 98906~|~1~|~2~|~02/S<2~|~Landslide repair project. GAL SR 588 11.43-11.45 in the City of Gallipolis. Urban other federal aid funded 80 federal/20 state. 114058~|~1~|~1~|~01/S<2~|~Roadway improvements on Dresden Avenue from Grant Street to Sixth Street. (4B97 Small City Program to provide 95% of the eligible costs, up to a maximum of $500,000) 114378~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State ) - No CAP - Repair of embankment along SR 16. 93554~|~1~|~2~|~02/NFA~|~100% local funds--watar works etc. 93554~|~1~|~1~|~01/NFA/LOR~|~SRTS project 97951~|~1~|~1~|~01/STR~|~SR 117 SLM 0.00 to SLM 3.91 and SR 196 SLM 4.41 to SLM 7.17 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in.) 98014~|~1~|~2~|~02/STR~|~HIG 134 15.38 (SFN 3602710) 98014~|~1~|~1~|~01/STR~|~Bridge ReplacementHIG 134 14.42 (SFN 3602672) 123121~|~1~|~1~|~01/BRO~|~Plan split for Bridge rehabilitation work. 123121~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work at 100% local cost. 87148~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 7 0.00-5.21. NHS route funded 80 federal/20 state. 87148~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 7.74-16.03 and GAL 325 0.00-7.26. Rural other federal aid funded 80 federal/20 state. 103869~|~1~|~1~|~01/SAF~|~Plans split 105205~|~1~|~1~|~01/S>2~|~Plan split for the resurfacing on a portion of HAM-264. 100996~|~1~|~1~|~01/STR~|~Overlay SR 29 and SR 66 in Shelby County: SHE SR 29 SLM 3.82 to 7.64 SHE SR 66 SLM 6.42 to 8.08 117050~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 111208~|~1~|~1~|~01/MPO~|~MPO funded Plan split 95229~|~1~|~2~|~02/SAF~|~Added plan split for 100% LNTP costs above max federal funds 95229~|~1~|~1~|~01/SAF~|~100% CEAO Safety funds for gruardrail replacement on various county routes. 115606~|~1~|~1~|~01/SAE~|~Diamond grooving from Mus IR 70-1.70 to the 2.00 to enhance traction on the Interstate 106557~|~1~|~1~|~01/NFP~|~Plan split 107537~|~1~|~1~|~01/NFA~|~Resurfacing BEL-379 94003~|~1~|~1~|~01/BRF~|~Work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. Part of the Ohio Bridge Partnership Program. 100% federal funds up to the cap amount. Funds needed over the cap to be provided by Defiance County. 96074~|~1~|~1~|~01/STR~|~"01/STR/OT/ " plan split for the construction of a new equipment wash bay at the existing Perry County Garage 84333~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 78 30.62-36.83. Rural other federal aid split 80 federal/20 state. 116137~|~1~|~1~|~01/SAF~|~Implement a Turbo Lane at the intersection of US 23 and Trego Creek Rd. 104823~|~1~|~1~|~01/MPO~|~Resurfacing Belden Village St. 96451~|~1~|~1~|~01/MPO~|~Renovate east facade and portions of north and south walls of the Richland County Garage. 96451~|~1~|~2~|~02/ENH~|~100% local items. 102790~|~1~|~1~|~01/IMS~|~This plan split is for work on Interstate bridge. 102790~|~1~|~2~|~02/S>2~|~This plan split is for removal of the bridge over HAM-22/Gilbert Ave. 101246~|~1~|~2~|~02/STR~|~Fine graded polymer AC overlay on UNI-739-0.58 to 0.63, UNI-739IC-0.00 to 0.06, UNI-287-0.58 to 0.73 101246~|~1~|~1~|~01/NHS~|~Resurfacing UNI US 33 from 0.00-8.78, and FGP AC overlay on UNI SR 739 0.28 to 0.58 101246~|~1~|~3~|~03/NFA~|~Fine graded polymer AC overlay on UNI-287-0.00 to 0.58 88904~|~1~|~1~|~01/NHS~|~Replace the esxisting superstructure on Bridge (HAS-22-2126, SFN 3401200) with new steel beam superstructure, and repair substructure units as needed. Slope protection will be needed under the scuppers at the forward abutment. 115926~|~1~|~1~|~01/MPO~|~Install traffic signal at the intersection of King Rd and the University Parks Trail, will signal activation for pedestrians and detection for bicycles. 118757~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement 99972~|~1~|~1~|~01/NHS~|~Plan split for BR eligible work on this structure at 80/20 fed/state. 109762~|~1~|~1~|~01/IMS~|~Fine Graded Polymer Modified Asphalt Concrete 101155~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 101155~|~1~|~1~|~01/NHS~|~AC Overlay with repairs. 95807~|~1~|~1~|~01/NFA~|~Not on the federal aid system, BEL-147-14.29 and various other sites for culvert repair/replacement. 90797~|~1~|~1~|~01/NFA~|~Intersection reconstruction to add left turn lane in all four approaches. The final configuratio will be curbed with 11' lanes and a back to back curb width of 36'. Storm sewers are included at the intersection of Chambersburg Road and Bellefontaine Road. 113726~|~1~|~1~|~01/CMQ~|~Split for work on this project using CMAQ funding. 109628~|~1~|~1~|~01/S<2~|~Resurfacing SR 647 from SLM 1.62 to 2.47 109628~|~1~|~2~|~02/STR~|~Resurfacing SR 647 from SLM 2.47 to 8.09 103698~|~1~|~2~|~02/S<2~|~Concrete deck overlay project. HOC CR 418 0.60, SFN 3703909. Urban other federal aid funded 80 federal/20 state. 103698~|~1~|~1~|~01/NHS~|~Concrete deck overlay project. HOC 33 8.30, SFN 3700429. NHS route funded 80 federal/20 state. 114309~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP/OT/ " District Preservation Funding - 4CP7 (100% State) - No CAP - Ding-N-Dent Guardrail repair District Wide 121383~|~1~|~1~|~01/NFA~|~Muskingum County Engineer's FY2029 pavement marking project funded by CEAO - 4HB7 @ 100% capped at $300,000. 84601~|~1~|~2~|~02/STR~|~Bridge work on MAH-US224 SFN 5004535, 5004608, 5004616 and MAH-534 SFN 5005809, 5005833, 5005892 84601~|~1~|~3~|~03/IMS~|~Bridge work on SFN 5005914 MAH-SR 534-2.84 over I 76. 84601~|~1~|~1~|~01/STR~|~Resurfacing in:MAH-224 from SLM 0.00-2.88 POR-224 from 18.67-21.22 and MAH-534 from 8.50-16.31 and TRU-534 from 0.00-7.50 99587~|~1~|~1~|~01/STR~|~STP Rural 103107~|~1~|~1~|~01/NFA~|~The Village of Paulding proposes new northbound (211' long including diverging taper) and southbound (161' long including diverging taper) turn lanes on US127 at the intersection of Gasser Road / Dooley Drive. 104786~|~1~|~1~|~01/CMQ/NEWA~|~LCATS/City of Newark CMAQ Funding - 4TB7/LC05 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Minor widening on Lic-CR 804-0.96 to 1.29 to accommodate the addition of Two Way Left Turn Lane (TWLTL) on Church Street from Green Wave Drive to 29th Street in the City of Newark. 123647~|~1~|~1~|~01/NFP~|~Plan split for district wide mowing work 113153~|~1~|~1~|~01/BRF~|~Replace structure > 20' span. 95514~|~1~|~1~|~01/NFA~|~Reconstruction of Historic Convered Bridge. 106327~|~1~|~1~|~01/NFA~|~Plan Split 101110~|~1~|~1~|~01/STR~|~Chip seal 101110~|~1~|~2~|~02/NFA~|~Chip Seal 101110~|~1~|~3~|~03/S<2~|~Chip Seal 87700~|~1~|~1~|~01/S<2~|~District Allocation 105084~|~1~|~1~|~01/NFP~|~This is the district?s systematic RPM replacement maintenance project. 112225~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair contract in Franklin County 93815~|~1~|~1~|~01/STR~|~Resurfacing of Riverview Road (CR-9) in Boston Township. From SLM12.40 (Peninsula Corp) to SLM 13.35 (Boston Mills Road). 101005~|~1~|~1~|~01/STR~|~Pavement marking work funded with rural STP funds. Work in Allen County on SR 12, SR 103, SR 196 and SR 696. Work in Defiance County on SR 2, SR 49, US 127 and SR 249. Work in Hancock County on SR 103 and SR 186. Work in Hardin County on SR 37, SR 117 and SR 273. All work in Paulding County not on US 24 or US 30. Work in Putnam County on SR 12, SR 66, SR 108, SR 114, SR 115, SR 189, SR 190, SR 613 and SR 696. Work in Van Wert County on SR 49, SR 66, SR 81, SR 117, SR 637, SR 697 and SR 709. Work in Wyandot County on SR 37, SR 103, SR 568 and SR 587. Funding is 100% federal funds SAC 4PF7. 101005~|~1~|~2~|~02/NHS~|~Pavement marking work on the Interstate system. All work on US 23, US 24, US 30 and US 33. All work on SR 12 in Hancock County from the City of Findlay to the east. All work on the the 4-lane section of US 68 in Hancock County which is from 12.84 to 14.64. All work on the 4-lane section of SR 15 in Hancock County which is from 17.28 to 28.24. All work on SR 15 in Wyandot County. Funding is 100% federal funds SAC 4PF7. 101005~|~1~|~4~|~04/SAE~|~Pavement markings for the wrong way drivers on US 30 in Paulding County and Van Wert County. 100% federal funds provided by the Safety Program. Funds needed over the cap provided by the District. 101005~|~1~|~3~|~03/NFP~|~Pavement markings work funding with 100% state funds. All work not covered in other plan splits will be in this plan split. This includes work on minor collectors which are not eligible for federal aid and routes where the work would be split between rural and urban STP as well as any work involving Interstate 75. 109239~|~1~|~1~|~01/STR~|~Culvert Replacement at ERI SR 0099 01.94 89251~|~1~|~1~|~01/ENH/COSH~|~"01/ENH/OT/COSH" - Cap $660,000 - Coshocton Lake Park 106699~|~1~|~1~|~01/NFP~|~Work to rehab a bridge. Funds from the Federal/State Exchange Program with the match provided by the Wyandot County Engineer. 99457~|~1~|~1~|~01/STR~|~DSR# TUS-008 105266~|~1~|~1~|~01/STR~|~AC overlay without repairs 105773~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 13 6.31. Type A Emergency. Rural other federal aid funded 100% state. 121313~|~1~|~1~|~01/NHS~|~Split for resurfacing 97798~|~1~|~1~|~01/IMS~|~SFNs 5502918 & 5502942 MIA-75-1415L/R - Remove and replace twin mainline bridges including minimal approach work. 97798~|~1~|~2~|~02/IMS~|~SFNs 5503000 & 5502977, MIA 75 1457 L/R -Remove wearing surface and replace with a latex modified concrete. Widen outside shoulder to 12'. 79666~|~1~|~1~|~01/IMS~|~Four lane resurfacing on I-270 from SLM 48.47-52.71 (Pavement Break east of Alum Creek Dr to FWD Approach Slab of US23 bridges.) 79666~|~1~|~2~|~02/IMS~|~SDC Deck Overlay & Deck Edge and Parapet Replacement on 1 structure:2513595 FRA-270-50.90 LockbournePier Patching on 2 structures:2513862 FRA-270-49.00 Alum Cr Dr SB2513560 FRA-270-51.93 Parsons Ave 97033~|~1~|~2~|~02/S<2~|~Intersection improvement project. Intersection of WAS 32 10.44-10.57/WAS 618 6.16-6.23 (Belpre-Pkg Bridge/SR 618). Work includes signal replacement and mill and fill. Funded 80 federal/20 local CMAQ and 90 federal/10 state Safety. 97033~|~1~|~1~|~01/NHS~|~Intersection improvement project. Intersection of WAS 32 9.41-9.77/WAS 618 7.00-7.04 (Toll Bridge/SR 618). Funded 80 federal/20 local MPO and 80 federal/20 local Safety. 118741~|~1~|~1~|~01/SAF~|~Safety improvement project in Scioto County 91512~|~1~|~1~|~01/S<2/Lon~|~London urban paving of SR 38, SLM 13.88-15.19 91512~|~1~|~4~|~04/NHS/Lon~|~MAD US 42 5.92 to 7.10 Urban Paving 91512~|~1~|~2~|~02/S<2~|~General system resurfacing of SR-38, SLM 15.19-16.28 91512~|~1~|~3~|~03/STR~|~General system paving of SR-38 from SLM 16.28-21.56 91512~|~1~|~5~|~05/NHS~|~100% City of London items not eligible for urban paving 120189~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 75909~|~1~|~1~|~01/IMS~|~Preventative Maintenance on the Priority System for FY2013. Work includes resfurfacing the ramps at the interchange of Sharon Rd. and HAM-75 and Indian Ripple and GRE-675 88740~|~1~|~1~|~01/IMS~|~Raised pavement markings on: MIA IR 75 0.00 to 19.95 MOT IR 70 0.000 to 13.870 SHE IR 75 0.000 to 20.550;Raised pavement markers on: AUG SR 198 2.67 to 3.19 CHP US 36 13.84 to 16.13 CHP US 36 16.13 to 17.18 CLA SR 235 3.95 to 5.54 CLA SR 235 0.00 to 2.57 MER SR 118 8.39 to 10.39 MIA US 36 7.21 to 7.87 MIA SR 718 8.16 to 10.19 MO... moreRaised pavement markers on: AUG SR 198 2.67 to 3.19 CHP US 36 13.84 to 16.13 CHP US 36 16.13 to 17.18 CLA SR 235 3.95 to 5.54 CLA SR 235 0.00 to 2.57 MER SR 118 8.39 to 10.39 MIA US 36 7.21 to 7.87 MIA SR 718 8.16 to 10.19 MOT US 35 6.16 to 10.32;Raised pavement markers on: AUG SR 198 3.19 to 4.85 CHP US 36 6.99 to 13.84 CHP US 36 17.18 to 19.48 CHP SR 55 0.00 to 11.65 CLA SR 235 2.57 to 3.95 CLA SR 235 5.54 to 11.82 DAR US 36 0.00 to 8.54 DAR SR 47 11.16 to 18.14 LOG SR 274 15.78 to 22.64 MER SR 29 8.17 to 9.17 MER SR 118 5.47 to 8.39 MER SR 118 10.39 to 13.42 MER SR 118 14.42 to 24.15 MER SR 118 24.70 to 27.09 MIA US 36 0.00 to 7.21 MIA SR 718 0.00 to 8.16 MOT US 35 0.00 to 6.16 MOT SR 123 0.00 to 2.08 SHE SR 589 0.00 to 4.70;Raised pavement markers on: CLA SR 235 0.00 to 2.57 MIA SR 718 8.16 to 10.19 MOT US 35 6.16 to 10.32;Raised pavement markers on: AUG SR 198 2.67 to 3.19 CHP US 36 13.84 to 16.13 CHP US 36 16.13 to 17.18 CLA SR 235 3.95 to 5.54 CLA SR 235 0.00 to 2.57 MER SR 118 8.39 to 10.39 MIA US 36 7.21 to 7.87 MIA SR 718 8.16 to 10.19 MOT US 35 6.16 to 10.32 122222~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-80-E 113176~|~1~|~1~|~01/MPO~|~Resurfacing of Swartz Rd from S Main St to Glenmount Ave. 101567~|~1~|~1~|~01/NFA~|~This project is for Construction Inspection FY16 101567~|~2~|~2~|~02/NFA~|~This project is for Construction Inspection FY17 106163~|~1~|~1~|~01/IMS~|~Plan split 112691~|~1~|~1~|~01/NHS~|~Federal/Local Urbanized Area Inside Corp. Limit US 20(Paving Items): 112691~|~1~|~2~|~02/S5K~|~Resurfacing on LOR SR 301 inside Corp limit. Paving items. 112691~|~1~|~3~|~03/NFP~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.): 112691~|~1~|~4~|~04/BRO~|~Bridge approach slap repair. 112691~|~1~|~5~|~05/SAF~|~Safety hazards including substandard guardrail and unprotected fixed objects in the clear zone. SLM: 16.98 (US 20 North of Chestnut Ridge Rd.)SLM: 18.95 (US 20 South of structures 4702670 AND 4702700). All the items in the median column SLM: 19.19 (US 20 North of structures 4702670 AND 4702700). All the items in the median column 112691~|~1~|~6~|~06/NFA~|~D-wall, SLM: 19.56 (SR 301 under the turnpike bridge) 90361~|~1~|~1~|~01/TRN/Cant~|~Streetscape/economic development project to improve traffic flow and safety. Address roadway pavement, curbs, sidewalks, ramps, crosswalks, lights, and signals. In the City of Canton, Stark County, Ohio. 90361~|~2~|~2~|~02/NHS/Cant~|~Resurfacing from Harmont Avenue to Canton East Corporation limit. In the City of Canton, Stark County, Ohio. 95601~|~1~|~1~|~01/NHS~|~It is propsoed to resurface with asphalt concrete US35 beginning 0.16 mile east of CR71 (Lloyds Brdg Rd.) (US34 SLM 8.35) head east for 4.88 miles and terminate 0.03 mile west of the SR32 ramp (US35 SLM 13.23).80/20 split 111841~|~1~|~1~|~01/SAF~|~Signal reconstruction at South/Main and South/Locust, signal timing and coordination, convert South/Sugartree to AWSC and add curb bumpouts, pavement markings and pedestrian upgrades 88894~|~1~|~1~|~01/STR~|~Resurfacing SR183 0.00-2.48 and US224 12.99-13.51 88894~|~1~|~2~|~02/STR~|~not BR Eligible: SFN 6703674 US224 13.18 100357~|~1~|~2~|~02/S<2~|~Overlay SR 118 with fine grade aggregate MER SR 118 9.89 - 10.39 100357~|~1~|~1~|~01/STR~|~Overlay SR 49 & SR 118 with fine graded aggregate. MER SR 49 0.00 - 3.52 MER SR 49 13.91 - 21.45 MER SR 118 10.39 - 13.42 MER SR 118 17.98 - 21.99 112810~|~1~|~3~|~03/STR~|~Resurfacing SR 644 112810~|~1~|~1~|~01/S<2~|~Asphalt resurfacing of COL-164 from SLM 15.72 to SLM 16.87 112810~|~1~|~2~|~02/NFA~|~Resurfacing COL-164 from SLM 16.87 to SLM 18.00 104815~|~1~|~1~|~01/S>2~|~Resurfacing in the City of Springfield. 102935~|~1~|~1~|~01/IMS~|~Plan Split for the interstate routes 102935~|~1~|~3~|~03/STR~|~Plan split for the rural routes 102935~|~1~|~4~|~04/S5K~|~Plan Split for the small urban routes 102935~|~1~|~2~|~02/S>2~|~Plan Split for the large urban routes in the project 101459~|~1~|~1~|~01/STR~|~DSR# JEF-007 104704~|~1~|~1~|~01/SAF~|~Reconstruct signal, add eastbound/southbound right-turn lanes and a SUP from Durrow to Georgesville 104704~|~1~|~2~|~02/SAF~|~BETHEL ROAD AT DIERKER ROAD 124676~|~1~|~1~|~01/SAF~|~Plan Split 1, CEAO safety funding 98177~|~1~|~1~|~01/STR~|~Replace structure MAD-29-7.03 over Dun Ditch 103807~|~1~|~1~|~01/NFA~|~The County will Construct approximately 3150 feet of new 2/3 lane roadway known as a public road A and public road B. Widening US23 to accommodate a new northbound right turn lane at the new public road B, extending the existing northbound right turn lane on US23 at Pittsburgh Road. 124845~|~1~|~1~|~01/BRO~|~Posted Single span box beam super replacement. 117537~|~1~|~1~|~01/SAF~|~Plan split for eligible safety related pedestrian improvements in the City of Cleveland. 117537~|~1~|~2~|~02/SAF~|~Plan split for eligible safety related pedestrian improvements in the City of Euclid. 117537~|~1~|~3~|~03/SAF~|~Plan split for eligible safety related pedestrian improvements in the City of Lorain. 102920~|~1~|~1~|~01/BRO~|~Bridges 116166~|~1~|~1~|~01/STR~|~Landslide repair. MOE 537 0.32. 89103~|~1~|~1~|~01/SAF~|~Upgrade existing signing and sign supports along US 35 in Greene County 76431~|~1~|~3~|~03/NHS/PATA~|~"03/NHS/OT/PATA" - 100% City of Pataskala - No CAP - for the costs of ADA ramps and any other City requested items on Lic-SR 16-00.00 to 07.22 76431~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation - No CAP - Lic-SR 16-07.22 to 14.10 - Treatment equals 5% Surface Repair, 1-1/4" Mill; 1-3/4" Item 442 Intermediate course and 1-1/2" Item 442 Surface coat 76431~|~1~|~1~|~01/NHS/PATA~|~"01/NHS/PV/PATA" - Urban Paving in the City of Pataskala - 80% District Preservation and 20% Local - No CAP - Surface Treatment = 5% Surface Repair, 1-1/4" Mill; 1-3/4" Item 442 Intermediate course and 1-1/2" Item 442 Surface coat 92601~|~1~|~1~|~01/NHS~|~Split for all paving work. 96858~|~1~|~1~|~01/SAE~|~Install and replace/upgrade guardrail on various county roads. 122973~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing. 109720~|~1~|~1~|~01/STR~|~Chip Seal 95485~|~1~|~1~|~01/MPO~|~Shared use path along N Lake to Cooper Foster and Oak Point; along Cooper Foster from N Lake to LCMP Mercy Recreation & Health Center. 95485~|~1~|~2~|~02/ENH~|~100% local items. 102354~|~1~|~1~|~01/STR~|~Concrete deck replacement. ATH 13 0687 (SFN 0500186). Rural other federal aid funded 80 federal/20 state. 108632~|~1~|~1~|~01/NHS~|~Repair 3 catch basins. 88569~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete USR 35 SLM 0.00 to 2.98USR 35 SLM 5.75 to 6.16 Classification = OM99999 88569~|~1~|~2~|~02/NHS~|~Overlay with asphalt concrete USR 35 SLM 6.16 to 9.10 Classification = NP22528 112920~|~1~|~4~|~04/SAF~|~Centerline Rumble Stripes 112920~|~1~|~3~|~03/NHS~|~Bridge Maintenance. 112920~|~1~|~2~|~02/NFA~|~ADA 247 0.00-0.35 112920~|~1~|~1~|~01/NHS~|~ADA 52 8.29-16.14 Overlay 108665~|~1~|~1~|~01/NHS~|~Plan split pavement reconstruction from SR-2 to Townline Road 108665~|~1~|~3~|~03/NHS~|~Plan split for drainage upsizing, PROTECT funds eligible for size increase 108665~|~1~|~2~|~02/NHS~|~Installation of combination curb and gutter and New drainage items, 100% eligible for PROTECT funding. 108665~|~1~|~4~|~04/NFA~|~Creating split for utility conflicts in construction. 97370~|~1~|~1~|~01/IMS~|~Highway signs 116790~|~1~|~1~|~01/STR~|~Items associated with the culvert work 100640~|~1~|~1~|~01/STR~|~Plan split for the Rural portion of the project 100640~|~1~|~2~|~02/S5K~|~Plan split for the Small Urban portion of the project 103499~|~1~|~1~|~01/STR~|~OH16-01, BEL-005 101562~|~1~|~1~|~01/BRF/FCEO~|~"01/BRO/BR/FCEO" Fairfield County Engineer replacement of deficient structure on Liberty Township Road 251 utilizing CEAO LBR funds with a federal max (at 80%) of $1,094,320. 119367~|~1~|~1~|~01/STR~|~Reconstruction and roadway improvements 120350~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 88393~|~1~|~1~|~01/BRO~|~Replacement of the bridge super structure with minimal approach work on MOT 202 0128 SFN #5700728 122465~|~1~|~1~|~01/NFA~|~Davids Drive Ph 3 (4R47, OPWC, Local Match) 122465~|~1~|~2~|~02/NFA~|~100% Locally funded utility work 115135~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. 98516~|~1~|~1~|~01/BRO~|~Work to repair the structure. District Preservation Program funds. 98516~|~1~|~2~|~02/STR~|~Slide repair work funded by the Geologic Site Management (GSM) program. Funds needed over the GSM cap will be from the District Preservation Program budget. Along the ditch to the north east of the structure. From approximately 1.70 to 1.76 on SR 108 in Putnam County. 115048~|~1~|~1~|~01/STR~|~Split for STP rural culvert work 96551~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 96551~|~1~|~1~|~01/STR~|~Resurfacing. 96551~|~1~|~4~|~04/STR/ANDO~|~Installing/upgrading of ADA Curb ramps along SR 85 in the Village of Andover. 96551~|~1~|~3~|~03/STR~|~Replacing structure 10' to 20' span. 97319~|~1~|~2~|~02/NHS~|~SCI US52 15.81 to 16.75 97319~|~1~|~3~|~03/NHS~|~SCI US 52 16.10 (SFN 7300905) 97319~|~1~|~1~|~01/NHS~|~SCI US 52 19.07 to 21.84 97319~|~1~|~4~|~04/NHS~|~This plan split is to cover curb ramps and signage at 100% local. 110109~|~1~|~2~|~02/S<2~|~Urban Paving Plan Split - City of Delaware 110109~|~1~|~1~|~01/S>2~|~General System/Urban Area Plan Split for resurfacing, pavement repairs, striping, etc. 90219~|~1~|~1~|~01/MPO~|~80% Federal MPO STP / 20% Local funding split for the resurfacing of Rockside Road. 90219~|~1~|~2~|~02/MPO~|~100% local partiicipation 103085~|~1~|~1~|~01/MPO~|~Resurfacing of Medina-Line Road (CR 2). 112676~|~1~|~1~|~01/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 5 112676~|~1~|~2~|~02/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 6 112676~|~1~|~3~|~03/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 9 112676~|~1~|~4~|~04/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 10 112676~|~1~|~5~|~05/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 11 112676~|~1~|~6~|~06/ERD~|~District 5 cable replacement - No Cap - 100% State (4PS7/005) 112676~|~1~|~7~|~07/ERD~|~District 6 cable replacement - No Cap - 100% State Funds (4PS7/006) 112676~|~1~|~8~|~08/ERD~|~District 9 cable replacement - No Cap - 100% State (4PS7/009) 112676~|~1~|~10~|~10/ERD~|~District 11 cable replacement - No Cap - 100% State funded (4PS7/0011) 112676~|~1~|~9~|~09/ERD~|~District 10 cable replacement - No Cap - 100% State funded (4PS7/0010) 108795~|~1~|~1~|~01/NHS~|~Safety related resurfacing. JAC 35 1.79-2.43 ROS 35 26.90-27.80 102494~|~1~|~1~|~01/NFP~|~Plan split for Crack-Sealing in D05 - 100% State 124103~|~1~|~1~|~01/NFP~|~District-wide construction engineering services. 116857~|~1~|~1~|~01/STR~|~Lighting project on MRG 266 4.13 and WAS 339 20.12. 117720~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE 260 2.11, SFN 5602378. 101410~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 Items on the NHS portion of SR 235 between SLM 7.54-7.58. 101410~|~1~|~2~|~02/NHS/FAIR~|~Plan Split for the 100% City Items on the NHS portion of SR 235 between SLM 7.54-7.58. 101410~|~1~|~3~|~03/S>2~|~Plan Split for the 80/20 Items on the portion of SR 235 between SLM 7.58-8.30 101410~|~1~|~4~|~04/S>2/FAIR~|~Plan Split for the 100% City Items on the portion of SR 235 between SLM 7.58-8.30. 81911~|~1~|~1~|~01/S>2~|~80/20 funding split in state STP for the resurfacing sections within the City of Independence. 81911~|~1~|~2~|~02/S>2~|~100% state STP for the resurfacing section within villages of Brooklyn Hts, Cuyahoga Hts, and Valley View. 81911~|~4~|~4~|~04/S>2~|~100% local funding 81911~|~1~|~3~|~03/S>2~|~100% local funding for ADA compliant curb ramps. 91603~|~1~|~1~|~01/BRO~|~Replace existing boxbeam structures for bridge (HAS-799-0391, SFN 3403173 and HAS-799-0453, SFN 3403203) with new single span prestressed concrete composite bridges. 102846~|~1~|~1~|~01/SAF~|~D09 PM FY2022 (B) 108440~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MOE 26 9.56. DSR MOE-022. Funded 100% federal. 112452~|~1~|~1~|~01/SAF~|~Intersection improvement project. Replacing overhead flashers with LED enhanced signs on all for approaches. VIN 56 3.02-3.40 and VIN 93 17.33-17.71. Funded 90 Federal/10 State. 90954~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% federal funds. 101057~|~1~|~1~|~01/NHS~|~This plan split is for the NHS route. 93648~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 123642~|~1~|~1~|~01/IMS~|~Plan split for lighting upgrades on the interstate 97557~|~1~|~1~|~01/STR~|~Ohio Brdg Part. 115437~|~1~|~1~|~01/NFP~|~Mowing 96948~|~1~|~1~|~01/NHS~|~It is proposed to line an exisiting pipe arch structure on US 35, 4.33 miles east of the Ross County line. 121141~|~1~|~1~|~01/IMS~|~Resurfacing IR 470 100678~|~1~|~1~|~01/NHS~|~Microsurfacing of TUS-250 from SLM 0.00 to SLM 3.66 and TUS-21 from SLM 0.00 to TUS-250. 100678~|~1~|~2~|~02/STR~|~Microsurfacing of SR-93 from US 250 to the Stark Co. Line and SR-212 from Stark Co. Line to Stark Co. Line. 98148~|~1~|~1~|~01/IMS~|~Interstate 90/10 Non-BR FRA-670-6.05 over CSX RR 109719~|~1~|~1~|~01/STR~|~AC overlay with repairs on:LOG-508 SLM 0.00 to 1.29 91726~|~1~|~1~|~01/IMS~|~Rehabilitate bridge GRE-675-0845N (colonel Glenn Highway over Ramps to IR 675) by replacing the asphalt wearing surface with a rigid wearing surface, painting the structural steel, replacing the bearings, and perfroming other minor rehabilitation items.GRE 675 0846N; SFN 2903741 and intersects: Colonel Glenn Highway-Cr1 91726~|~1~|~2~|~02/IMS~|~Resurfacing and pavement repair on all of the ramps involved in this interchange. To/From I-675 and To/From Colonel Glen Highway. 96197~|~1~|~1~|~01/STR~|~01/STR/OT ; Plan split for 80% federal and 20% state funded culvert work using the culvert SACs 4CW7 and 4CV7. 86956~|~1~|~1~|~01/S>2~|~Plan Split for TRU SR 304 0.00 to 1.02 (80%/20%) Items. 86956~|~1~|~2~|~02/S>2/GIRA~|~Plan Split for 100% city items. 106282~|~1~|~1~|~01/NFP~|~Pavement markings along various routes in Ashtabula, Mahoning and Trumbull Counties. 96672~|~1~|~2~|~02/NHS/TALL~|~100% Urban Paving Costs inside the City of Tallmadage 96672~|~1~|~1~|~01/NHS~|~Resurfacing SUM-SR 261-13.72 to 14.92. 89046~|~1~|~1~|~01/NHS~|~Split for all work on the NHS portion of this project. This would be only for the work on SR-44. District, MPO and Safety funds are capped. 89046~|~1~|~2~|~02/S>2~|~Split for all non-NHS work on the project (Crile Rd, Auburn Rd, new connector road). Safety and MPO funds are capped. Local is responsible for any funds above the caps. 109844~|~1~|~1~|~01/STR~|~ROS 180 7.66-11.96ROS 327 2.08-7.99 109844~|~1~|~2~|~02/STR~|~Bridge preventative maintenance. 109844~|~1~|~3~|~03/NFP~|~Retro Fuel Price Adjustment 104703~|~1~|~1~|~01/IMS~|~Construction Inspection for PID 82288 104703~|~1~|~2~|~02/IMS~|~Construction Inspection for PID 104667 121555~|~1~|~1~|~01/STR~|~All work included in this split. 101883~|~1~|~1~|~01/NHS~|~Bin wall reconstruction along State Route 14 near Lake Rockwell, in the City of Streetsboro, Portage County, Ohio. 92114~|~1~|~1~|~01/IMS~|~resurface LUC IR 475 9.06-9.92 - Central Ave to I-475/US23 split 99848~|~1~|~1~|~01/MPO~|~Covers work related to wideing of Sawmill Rd, multi use path, and intersection upgrades to Bright/Sawbury and Hard. 91139~|~1~|~1~|~01/BRF~|~8738858 WOO CR28 0.02 Intersect: Rocky Ford Mermill Road 101370~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 733 1.13, SFN 5340780. Rural other federal aid funded 80 federal/20 state. 92954~|~1~|~1~|~01/NHS~|~$1,100,000 City of Medina / TRAC Funds 92954~|~1~|~2~|~02/NHS/MED~|~100% Local Items - Water works 92954~|~3~|~3~|~03/NHS~|~Funding for Questions, VECP's, and MOT Plan Changes for Project to be utilized by consultant. 92954~|~1~|~4~|~04/NHS~|~Fund the remainder of the approved modification 17337-8 for the on-going services during construction. 102686~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 50 0.00-1.756 and VIN 50 22.81-30.167. Rural other federal aid funded 80 federal/20 state. 102686~|~1~|~2~|~02/STR~|~Resurfacing with an asphalt overlay treatment on MOE 145 12.87-15.34. Funded 80 Federal/20 State Major Investments Funds. 93920~|~1~|~1~|~01/CMQ~|~Project will interconnect six (6) existing signalized intersections (Broad Street with: Dayton, Main, Xenia, Hebble, Central, and Highview Streets) with fiber optic cable, replace outdated non-standard signal infrastructure, and construct missing sidewalk. 99472~|~1~|~1~|~01/NHS~|~Geological Site Management Funding - 4SF7 (80%)/4SS7 (20%) - No CAP - Rock Scaling of the rock face on COS-US 36-24.16. 99472~|~1~|~2~|~02/NHS~|~Geological Site Management Funding - 4SF7 (80%)/4SS7 (20%) - No CAP - Rock Scaling of the rock face on COS-US 36-27.82. 99472~|~1~|~3~|~03/S<2~|~Geological Site Management Funding - 4SF7 (80%)/4SS7 (20%) - No CAP - Rock Scaling of the rock face on COS-SR 83-13.55. 91845~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on HOL-241-0.00 to 7.75.; includes pavement repairs, pavement marking 93776~|~1~|~2~|~02/IMS~|~Bridge rehabilitation on SFN 5707560 MOT 75 1178 M (RMP US 35*W - I 75*S 93776~|~1~|~1~|~01/BRO~|~Replace six span structure with single span structure over Albany Street on SFN 5707366 MOT 75 1164 93776~|~1~|~3~|~03/IMS~|~Reimbursement for crash attenuators 87729~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 87729~|~1~|~2~|~02/NHS~|~Bridge work determined later 87729~|~1~|~3~|~03/SAF~|~Split 3/1 is additional cost for permanent wet reflective optics (100% 4HJ7 / $1250 per mile) and for Grooving costs for the wet reflective permanent pavement markings (100% 4HJ7 / $5280 per mile), capped. Remaining balance will be paid for with Dist funds (4PF7/4PS7). 96168~|~1~|~1~|~01/STR~|~Project to include several drainage maintenance items along SR 732 in Village of Reily. Improvements include replacing, abandon, or provide alternative water path for the following culverts: BUT-732-0290 and BUT-732-0291L. Replace the following culverts: BUT-732-0294, BUT-732-0295R, and BUT-732-0296R. 95099~|~1~|~1~|~01/ERD~|~Earmark ID FL1201 is an earmark with 100% federal pariticipation to be used for replacing a culvert under Riverview Road and reconstructing Vaughn Road to minimize damage to flooding near the intersection of Riverview Road and Vaughn Road in the City of Brecksville. 103288~|~1~|~2~|~02/S>2/NCAN~|~Waterline. 103288~|~1~|~1~|~01/MPO~|~Construction of roundabouts, drainage, curb and gutter, signing, pavement markings, lighting, aprons, landscaping. Intersection of Shuffel (CR230) and Pittsburg (CR-216) and Orion (TR-217). 124583~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federally eligible bridge on the interstate system 102321~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads in Logan County. 83018~|~1~|~4~|~04/S>2/FRA~|~100% item - water line relocation with FRA County Sanitary Sewer District (public utility - legislation with FRA County) 83018~|~1~|~2~|~02/S>2~|~D6 funding for resurfacing and drainage 83018~|~1~|~1~|~01/SAF~|~Safety funded section improvement-medians, sidewalks, access relocations/closures, signals 83018~|~1~|~3~|~03/ENH~|~Enhancement funding for landscaping items with Franklin Township 87755~|~1~|~1~|~01/S>2~|~80/20 fund split for District Preservation funding for the structural steel painting of SFN 4305671 (LAK-283-0472) over Chagrin River approximately 3.84 miles west of SR-306. 104955~|~1~|~1~|~01/STR~|~Plan Split for Bridges MAR-309-12.73, MAR-309-25.37 104955~|~1~|~2~|~02/NFA~|~Work on MAR-746-6.25 structure. Not on Federal Aid System 82381~|~1~|~1~|~01/IMS~|~Mill and fill resurfacing existing IR 70 mainline and construction of an additional lane on IR 70 from Enon Road to US 68 at 0.68 mile east of the Junction of SR 4 (Springfield) to the junction of US 68.. Construct a noisewall. CLA IR 70 6.75/10.55 118979~|~1~|~1~|~01/S5K~|~Plan Split for CSTP fund in Function Classification "Other Federal Aid - Urban 5,000 - 49,999" in Wauseon urbanized area. 118979~|~1~|~2~|~02/STR~|~Plan Split for CSTP funding for Functional Classification "Other Federal Aid - Rural <5,000" road segment(s) 118979~|~1~|~3~|~03/NFA~|~Plan Split for work on Function Classification: Minor Collector 119082~|~1~|~1~|~01/NHS~|~Plan split for project to rehabilitate bridge size culvert HAM-52-3918 with carries US 52 over Eight Mile Creek by lining with a new pipe. 124405~|~1~|~1~|~01/NFA~|~Sidewalk and Crosswalk enhancements at 4 Groveport Madison Schools 124024~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with Repairs: HUR-61-0.00 to 0.490; HUR 61-2.580 to 2.923; HUR-103-1.624 to 3.144; HUR-598-3.037 to 3.138Asphalt Concrete Overlay without Repairs: HUR-61-0.490 to 2.580Includes bridge maintenance 124024~|~1~|~3~|~03/NFA~|~Asphalt Concrete Overlay with Repairs HUR-598-3.138 to 4.215 including bridge maintenance 124024~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs:CRA-602-13.641 to 14.465HUR-103-0.00 to 1.624RIC-603-16.918 to 18.548Includes bridge maintenance 115316~|~1~|~1~|~01/STR~|~Items eligible for TAP funding - Sidewalks, ADA elements, lighting, etc. 115316~|~2~|~2~|~02/STR~|~100% Local funded items to reconstruct roadway up to the asphalt base. Including urban gutter drainage facilities and earth work, etc. 97390~|~1~|~1~|~01/BRO~|~Plan split for all bridge work using federal funds 97390~|~1~|~2~|~02/NFP~|~Split 2 for CPP work at 100% local cost 97390~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 95421~|~1~|~2~|~02/STR/LAW~|~Rural section: 1.27 to 4.30Complete description:On CR31 (Big Brand Road), begin ar CR1 and terminate at CR17, it is proposed to resurface CR31 begining at SLM 0.00 and terminating at SLM 4.30 80 Fed/20 local match 95421~|~1~|~1~|~01/MPO/LAW~|~MPO section: 0.00 to 1.27Complete description:On CR31 (Big Brand Road), begin ar CR1 and terminate at CR17, it is proposed to resurface CR31 begining at SLM 0.00 and terminating at SLM 4.30 80 Fed/20 local match 17779~|~1~|~1~|~01/STR~|~Covers all project related construction items 109734~|~1~|~1~|~01/STR~|~work on the rural sections of GRE-42 109734~|~1~|~2~|~02/S>2~|~work on Large Urban portion of GRE-42 116335~|~1~|~1~|~01/STR~|~Plan Split for resurfacing on PRE-127 88004~|~1~|~2~|~02/STR~|~100% Rural Lorian County Water Authority (RLCWA) funding responsibility 88004~|~1~|~1~|~01/STR~|~Culvert Replacement 122553~|~1~|~1~|~01/NFA~|~Resurfacing project of the NOB Seneca Lake Parkside Campground roads. 123525~|~1~|~1~|~01/IMS~|~Plan split for culver replacement and repair at various interstate locations in the district 122877~|~1~|~1~|~01/NFP~|~All work included in this plan split. 96115~|~1~|~1~|~01/NFP~|~Construction Inspection 119711~|~1~|~1~|~01/STR~|~Construct Trail 112174~|~1~|~1~|~01/NFA~|~Overhead sign replacement in various locations throughout District 9. 110960~|~1~|~1~|~01/NHS~|~Landslide repair project WAS 7 36.50-36.53 using 80% Federal/20% State Preservation funds. 101343~|~1~|~1~|~01/STR~|~Bridge rehab. 103411~|~1~|~1~|~01/IMS~|~Plan Split for the demo 121126~|~1~|~1~|~01/STR~|~Resurfacing SR 170 115735~|~1~|~1~|~01/SAF~|~2027/2028 Traffic Signal Maintenance 88979~|~1~|~3~|~03/S<2~|~District Allocation: CRA-19-0.70 88979~|~1~|~2~|~02/IMS~|~Bridge (< 20') Repair: WAY-71-6.29 88979~|~1~|~5~|~05/S>2~|~District Allocation (4PS7): MED-57-10.00 88979~|~1~|~1~|~01/IMS~|~District Allocation: LOR-90-14.14 / MED-76-6.10 / MED-76-10.42 / RIC-71 & RIC-97 Ramp 88979~|~1~|~4~|~04/NHS~|~Culvert Rehabilitation: RIC-39-11.49 107321~|~1~|~1~|~01/IMS~|~See linked structures > 20' span. 107321~|~1~|~2~|~02/NHS~|~See linked structures > 20' span. 86028~|~1~|~1~|~01/ENH/JOHN~|~"01/ENH/BR/JOHN" - Enhancement Funding 4B37(80% Federal) / 4BG7(20% Local) - CAP of $429,000.00 for 80% Federal Share - Enhancement project to construct a bridge and connecting bike path in Johnstown between the Kroger Entrance and Westgate Drive. 117793~|~1~|~1~|~01/NHS~|~All work improving conduits and storm sewers in the project 105327~|~1~|~1~|~01/NFA~|~Smooth seal on non-Federal Aid route: LOG SR 274 SLM 12.24 to 15.78 116955~|~1~|~1~|~01/IMS~|~Split for pavement replacement work on IR-90 116955~|~2~|~2~|~02/IMS~|~Slope repair adjacent to the WB west area on ramp. 84655~|~1~|~1~|~01/IMS~|~IR76 06.31-8.42 Minor rehab pavement resurfacing 84655~|~1~|~2~|~02/IMS~|~Bridge work to ten structures along IR-76 in the City of Akron, Summit County, Ohio. 86444~|~1~|~1~|~01/MPO~|~Traffic/Safety Cameras: Install conduit for the City's telecommunication system for approx. 100 security cameras inside the Banks garages and at the street levels throughout the street grid. Cameras will be connected to the ARTIMIS system. Second Street (Elm St to Main St): Enhance the north sidewalk to improve the pedestrian zone and relocate utilities in order to provide an ADA accessible path to the Riverfront Transit Center head houses and replace failed sidewalk. Freedom Way (Rosa Parks to Walnut St): Reconstruct the alignment and grade, including the replacement of the expansion joint at the back of the north walk, to better align at its termini and improve drainage and pedestrian safety. Temp. Race Street: Remove the temporary Race Street structure south of the south line of Freedom Way West to prepare for future development and access; and thus any potential public safety issue related to the abandoned structure. Current structure is not compatible with grades necessary to meet planned access points. 86444~|~2~|~2~|~02/S>2~|~State reimbursement for BP #6 103445~|~1~|~1~|~01/STR~|~Landslide repair. NOB 146 17.43. Work length approximately 290 ft. DSR NOB-006. 114447~|~1~|~1~|~01/STR~|~Resurfacing SR 152 108832~|~1~|~1~|~01/STR~|~Tree removal. 98496~|~1~|~1~|~01/STR~|~Work on SR 103. District Preservation Program funds. Federal funds are rural STP. 98496~|~1~|~2~|~02/NFA~|~Work on SR 698. This route is a Rural Minor Collector and is NOT eligible to use Federal funds. 114056~|~1~|~1~|~01/NHS~|~Safety Funding Eligible 114056~|~1~|~2~|~02/SAF~|~Additional Sidewalk Work 114056~|~1~|~3~|~03/ENH~|~100% Local Items 81253~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation-Pavement Marking 4MP7 (100% State) - No CAP - Pavement Markings on: 1) Lic-IR 70-28.66 to 28.93; 2) Mus-IR 70-00.00 to 01.46; 3) Lic-IR 70-28.93 to 29.16; 81253~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge replacement on 1) 4504534 LIC IR70 28.88 Intersect: IR70 Over Valley Run; Not BR Eligible for Replacement: Length=69' SD/FO(1) SR=63.2 DSR=6 2) 4504569 LIC IR70 28.88 Intersect: IR70 Over Valley Run ; Not BR Eligible for Replacement: Length=99' SD/FO(1) SR=63.2 DSR=6 81253~|~1~|~2~|~02/IMS~|~"02/IMS/PV/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing of: 1) Lic-IR 70-28.66 to 28.93; 2) Mus-IR 70-00.00 to 01.46; 3) Lic-IR 70-28.93 to 29.16; 94389~|~1~|~1~|~01/NFA~|~General System Resurfacing- Not on Federal Aid Sysytem 94389~|~1~|~2~|~02/NFA~|~Bridge work MED-606-3.82 SFN:5208130 109323~|~1~|~1~|~01/STR~|~Slide Repair DSR# LAW-003LAW CR 3.53 100578~|~1~|~1~|~01/STR~|~JAC 93 (0.00-6.33) 77270~|~1~|~1~|~01/IMS~|~Reconstruct the interchange of IR-76/IR-77 with SR 8/IR-77, in the City of Akron, Summit County, Ohio. 105691~|~1~|~1~|~01/STR~|~This plan split uses federal and state funds from the Geologic Site Management (GSM) program and the District Preservation Program. The GMS funds are to be used first. 97260~|~1~|~1~|~01/STR~|~Bridge deck replacement project. GAL 141 12.46, SFN 2701685. Work includes abutment repair. Rural other federal aid funded 80 federal/20 state. 88656~|~1~|~2~|~02/NHS~|~FY2014 Urban Paving in the City of Cincinnati on US 42 US 27, US 27D, and US 52. This Plan Split is for the NHS portion on US 27 between SLM 7.16-9.19. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 88656~|~1~|~1~|~01/NHS~|~FY2014 Urban Paving in the City of Cincinnati on US 42 US 27, US 27D, and US 52. This Plan Split is for the NHS portion on US 27 between SLM 7.16-9.19. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. 113567~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 100307~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay to POR SR 225 from 5.24 to 10.26. 119775~|~1~|~1~|~01/NFA~|~added plan split. 109993~|~1~|~1~|~01/STR~|~Rural Plan Split: MAD-62-1.45-2.39, MAD-62D-0.00-1.10, MAD-207-1.15-1.39 & MAD-56-23.01-23.89 101108~|~1~|~1~|~01/STR~|~AC overlay without repairs on rural route: DAR US 127 SLM 22.26 to 25.30 103960~|~1~|~1~|~01/S>2~|~Old 74 Overpass 112902~|~1~|~1~|~01/STR~|~Culvert replacement 123578~|~1~|~1~|~01/NHS~|~Plan Split for pavement Maintenace on NHS route 117136~|~1~|~1~|~01/SAF~|~Safety funded plan split 83700~|~1~|~1~|~01/BRF~|~bridge replacement 110487~|~1~|~1~|~01/MPO~|~Signalization of the intersection which qualifies of federal-aid 116775~|~1~|~1~|~01/STR~|~Guardrail Repairs. 112624~|~1~|~1~|~01/MPO~|~Resurfacing South Ave from Presidential Dr to Mathews Rd. 114088~|~1~|~1~|~01/NFA~|~ Created for possible J&C involvement 89030~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split utilizing MPO CMAQ, MPO Transit, and STP funding. 89030~|~1~|~2~|~02/ENH~|~80/20 MPO/local funding split for enhancement work. 89030~|~1~|~3~|~03/S>2~|~100% local funding 122958~|~1~|~1~|~01/NFA/HEBR~|~Pedestrian path along Canal Rd in the Village of Hebron. 96460~|~1~|~2~|~02/NHS~|~100% local for work not eligible for state funding as well as for cost above the urban resurfacing funding. 96460~|~1~|~1~|~01/NHS~|~80/20 state/local funding split 101829~|~1~|~1~|~01/STR~|~Pavement marking project using HSIP funds (100% Federal) on MEG CR 14 0.00-1.14. 91749~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. MOE 78 23.50-32.26. Rural other federal aid funded Federal 80% and State 20%. 109101~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 10.54. 100% State ER funded. 101741~|~1~|~1~|~01/NFP~|~Drainage repair and maintainance areas that accepts drainage from the Ohio Turnpke in the City of North Royalton between York Road and Bennett Road. 103708~|~1~|~1~|~01/S<2~|~SCI 140 2.16-2.20 Safety project 98560~|~1~|~1~|~01/STR~|~Plan split for all pavement work related to resurfacing the entire SR 726 in Preble County 110821~|~1~|~1~|~01/NFP~|~Project to Chip Seal Urbana Wildlife Area for ODNR Roadway Maintenance Program 92893~|~1~|~2~|~02/S<2~|~100% City of Wooster 92893~|~1~|~1~|~01/S<2~|~Urban Paving - 80/20 - District Allocation/City of Wooster 112974~|~1~|~1~|~01/IMS~|~Paint the Ohio approach bridges to the Brent Spence Bridge. Plan Split 1 for Major Bridge funded locations on 3 bridges. 112974~|~1~|~2~|~02/IMS~|~Paint the Ohio approach bridges to the Brent Spence Bridge. Plan Split 2 for District funded location on 1 bridge: HAM-75-0022L. 96664~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay with repair treatment. NOB 566 0.00-1.59. Rural other federal aid funded 80 federal/20 state. 96664~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay with repair treatment. NOB 566 1.59-4.80. Not on any federal aid system funded 100% state. 119000~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement. 92685~|~1~|~1~|~01/S<2~|~Work on SR 15 in Defiance County from the beginning of the project at the corportation limits of the City of Defiance at 17.01 to the Defiance Area Urban Area boundary at 17.65. Work is inside the Defiance Urban Area but outside the City of Defiance. All funds from the District Preservation Program budget. No local funds. 92685~|~1~|~2~|~02/STR~|~Work on SR 15 in Defiance County from the Defiance Urban Area boundary at 17.65 to the end of the project at county line at 24.33. Work on SR 111 in Paulding County from US 127 at 16.37 to SR 637 at 21.96. Work on SR 634 from SR 613 at 15.43 to the north corporation limits of the Village of Continental at 16.43. All funds from the District Preservation Program budget. No local funds. 103016~|~1~|~4~|~04/NHS~|~Bridge work on:ASD-250-1391 SFN 0304824ASD-250-1408 SFN 0304832 103016~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% NHS Inside Corp. Limit (Paving Items):ASD SR 0250 SLM 12.22 TO 12.27(RT), SLM 12.50 TO 12.58(RT),SLM 12.72 TO 13.10, SLM13.48 TO 14.97. 103016~|~1~|~2~|~02/NHS~|~100% Local (Ashland):NHS Inside Corp. Limit (Items Such as Pavement Repairs, etc.):ASD SR 0250 SLM 12.22 TO 12.27(RT), SLM 12.50 TO 12.58(RT),SLM 12.72 TO 13.10, SLM13.48 TO 14.97. 103016~|~1~|~5~|~05/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): ASD SR 0058 SLM 0.000 to 0.570(LT), SLM 0.000 to 0.610(RT) 103016~|~1~|~3~|~03/NHS~|~NHS: ASD-250-12.22-14.97 80/20 Fed/StateDistrict Allocation Federal/State: NHS Outside Corp. Limit (Paving Items Etc?): ASD-SR-0250 ? SLM 12.22 to 12.27 (LT), SLM 12.27 to 12.50, SLM 12.50 to 12.58 (LT), SLM 12.58 to 12.72, SLM 13.10 to 13.48, 103016~|~1~|~6~|~06/S<2~|~100% Local (Ashland): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): ASD SR 0058:SLM 0.000 to 0.610 102889~|~1~|~1~|~01/STR~|~LAW 378 2.21 Culvert Liner 84649~|~1~|~2~|~02/NHS~|~ROS US23 16.36 - 22.20 Resurfacing ProjectBrdgs F/Rehab:7101112 ROS US23 19.42 Intersect: Kinnikinnick Creek7101147 ROS US23 19.42 Intersect: Kinnikinnick Creek7101171 ROS US23 21.05 Intersect: Blackwater Creek7101201 ROS US23 21.05 Intersect: Blackwater Creek7101236 ROS CR280 22.19 Intersect: Co Rd 280Skip 7102194 US35 80/20 split02/NHS/BR/State 84649~|~1~|~1~|~01/NHS~|~ROS US23 16.36 - 22.20 Resurfacing ProjectOn US23 beginning 0.28 mile north of the ramp from SR159 (SLM 16.36) north for 5.84 miles and terminate at the Picaway Coutny Line (SLM 22.20) it is proposed to resurface the 4-Lane Highway80/20 split01/NHS/PV/State 115728~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of LIC SR 13 22.20 (SFN 4500520) carrying SR 13 over North Fork Licking River 119266~|~1~|~1~|~01/IMS~|~Mowing 114232~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 28 0.00-3.72. Funded through the Local Roads Oil and Shale Program. 96996~|~1~|~1~|~01/ENH/EL~|~Construction of streetscape in East Liverpool on East 4th Street from Washington St. to approx. 150' east of Walnut St.; Transportation Alternative Program funded items at 80% federal. 96364~|~1~|~1~|~01/IMS~|~Flood entire decks with SRS 96364~|~1~|~3~|~03/STR~|~Flood entire decks with SRS 96364~|~1~|~4~|~04/S<2~|~Flood entire deck with SRS 96364~|~1~|~2~|~02/NHS~|~Flood entire decks with SRS 122954~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 107478~|~1~|~2~|~02/S5K~|~Resurfacing LOR SR 611 0.52 TO 1.203 / LOR SR 611D 0.63 to 0.495AC Overlay w/Rpr 107478~|~1~|~1~|~01/NHS~|~Resurfacing: LOR SR 611 1.203 TO 04.250 AC Overlay w/Rpr 107478~|~1~|~5~|~05/SAF~|~LOR-611 road diet and curb ramps. 107478~|~1~|~4~|~04/S5K~|~LOR SR 611 0.052 to 1.203 / LOR SR 611D 0.063 to 0.495 pavement repairs, castings reconstructed to grade, and concrete pavement work. 107478~|~1~|~3~|~03/NHS~|~LOR SR 611 1.203 TO 4.250 pavement repairs, castings reconstructed to grade, and concrete pavement work. 91813~|~3~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Replacement of: 1) 3004805 GUE SR265 9.45 Intersect: Over Br Leatherwood Creek: BR Eligible Length = 20' SD/FO(1) SFR=21.3 DSR=4; 91813~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Replacement of: 1) 3004740 GUE SR265 7.29 Intersect: Over Br Leatherwood Creek: BR Eligible Length = 24' SD/FO(1) SFR=30.9 DSR=4; 91813~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 3004775 GUE SR265 8.61 Intersect: SR 265 Over Ditch; Not BR Eligible for Replacement or Rehabilitation: Length=18 SD/FO(0) SR=23.4 DSR=4 123801~|~1~|~1~|~01/STR~|~stp rural 124453~|~1~|~1~|~01/SAF~|~Installing sidewalks. 25655~|~1~|~3~|~03/STR~|~Bridge Work 25655~|~1~|~2~|~02/S<2~|~District Allcoation Resurfacing WAY-261-08.47 - 09.31 Urbanized Area 25655~|~1~|~1~|~01/STR~|~District Allocation Resurfacing WAY-226-00.91 - 08.47 Rural 97167~|~1~|~1~|~01/SAF~|~Safety funding for signal, ped facilities, and EB RTL at Innis and SR-3 100908~|~1~|~1~|~01/SAF~|~Construct an over-height detection and warning system 106317~|~1~|~1~|~01/NFP~|~Crack sealing of various routes throughout district 4. 112172~|~1~|~1~|~01/BRF~|~Replacement of the existing bridge (SFN: 6842380) that carries Geeding Street over Sams Creek. 104975~|~1~|~1~|~01/STR~|~Rockfall hazard remediation, GAL 141 8.85. GSM funded. Rural other federal aid funded 80 federal/20 state. 122317~|~1~|~1~|~01/S>2~|~Construct Noise Wall 101292~|~1~|~2~|~02/NHS~|~SAN-53 from 11.40 to 11.75 in corp. 101292~|~1~|~1~|~01/NHS~|~For SR-53 piece not in city corp (SLM 11.75 to 12.95). 118738~|~1~|~1~|~01/NFA~|~NOB-CR-40-2.41 SFN 6130437 87309~|~1~|~2~|~02/S<2~|~Resurfacing of SR 416 in the Dover-New Philadelphia urban area from SLM 3.85 to 4.63. 87309~|~1~|~1~|~01/STR~|~Resurfacing on SR 416 near the Dover-New Philadelphia urban area from SLM 0.00 to 3.85. 112063~|~1~|~1~|~01/SAF~|~Split 1 for eligible work for the interchange reconfiguation 112063~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 105556~|~1~|~2~|~02/ENH/PCPD~|~Relocating the Portage Hike & Bike Trail from Ravenna Road on the railroad bridge. 105556~|~1~|~1~|~01/BRO~|~Structure replacement. 117780~|~1~|~1~|~01/NFA~|~Created Plan Split for J&C involvement 84440~|~1~|~1~|~01/BRF~|~It is proposed the replace the deficient structure, SFN 0803243. Project Termini: Project is on SR286, 0.35 mile from its intersections with CR87, Bodman Road. 0803243 BRO SR286 4.6 Intersect: Five Mile CreekThis is a non federal aid system but it is BR eligible. 80% Fed/20% state01/BRF/BR/State 93263~|~1~|~1~|~01/BRO~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) and Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC) - Rehabilitation on 1602403 COS SR541 19.18 Intersect: Sr 541 Over Sr 16 & 83; BR Eligible for Rehabilitation: Length=146 SD/FO(2) SR=67.0 DSR=5 93263~|~1~|~3~|~03/NHS~|~District Preservation Paving on NHS - 4PF7(80% Federal) / 4PS7(20% State); Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC): Earmark OH403 funding 4R47 (100% Federal) - Resurfacing with related work on COS SR 16 08.99 to 09.84 93263~|~1~|~2~|~02/S<2~|~District Preservation Bond 100% State; Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC); then 4PF7(80% Federal) / 4PS7(20% State) - Rehabilitation on 1601237 COS SR541 19.3 Intersect: Muskingum River; Not BR Eligible for Rehabilitation: Length=801 SD/FO(0) SR=85.2 DSR=5 93263~|~1~|~4~|~04/S<2~|~District Preservation Paving - 4PF7(80% Federal) / 4PS7(20% State); Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC) -Resurfacing with related work on COS SR 541 19.06 to 19.53 95746~|~1~|~1~|~01/NHS~|~HEN-6 from SLM 24.55 to SLM 27.99 122988~|~1~|~1~|~01/STR~|~bridge plan split. 91022~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on 117398~|~1~|~1~|~01/MPO/HUBB~|~Resurfacing Elmwood Dr from SR 304 to Jerry St (Base Bid), Additive Alternate for resurfacing Elmwood Dr from Jerry St to Hubbard North Corp Limit. 110060~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MRW-71-12.19-19.53 110060~|~1~|~2~|~02/STR~|~MRW-61 Resurfacing Plan Split 110060~|~1~|~4~|~04/IMS~|~Patching approach slabs and installing polymer modified expansion joints on three sets of twin bridges along MRW-71. MRW-71-1550L & R, MRW-71-1763L & R, MRW-71-1876, MRW-71-1877 110060~|~1~|~3~|~03/IMS~|~Culvert Plan Split: Lining culverts MRW-71-12.225 & MRW-71-12.916 110060~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 100658~|~1~|~1~|~01/S>2~|~plan split for pavement work in the large urban sections 100658~|~1~|~2~|~02/STR~|~plan split for pavement work in the rural sections 109037~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 13.99-14.04. 100% State Emergency funds. 109061~|~1~|~1~|~01/NHS~|~Slide repair on SCI 23 3.71 103098~|~1~|~1~|~01/IMS~|~Interstate Plan Split for the following Routes:FRA-70-0.00-3.41FRA-270-42.84-48.47FRA-70-5.24-5.26 122472~|~1~|~1~|~01/S>2~|~Plan split for bridge work 100373~|~1~|~1~|~01/STR~|~For work outside the Van Wert Urban Area. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. Rural STP. No local funds. 100373~|~1~|~2~|~02/S<2~|~For work inside the Van Wert Urban Area but outside the City of Van Wert. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. Urban STP. No local funds. 124098~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 56 3.06 (SFN 8200726). 101388~|~1~|~1~|~01/NFA~|~HIG CR 10 1.62 (SFN 3630668) 113792~|~1~|~2~|~02/S50~|~Lighting - 100% Local Funds 113792~|~1~|~1~|~01/S50~|~Improve safety of the corridor through access management by constructing raised medians from Leffel to Lansdowne and on east leg of Leffel for 150'. Modify signal and lane configuration at the Leffel intersection and construct loon for SB u-turns. 117069~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - No CAP - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of bridge wearing surface and deck patching. 116566~|~1~|~1~|~01/S50~|~plan split for bridge work 100070~|~1~|~1~|~01/STR~|~LAW 217 9.80 Slide Repair 92552~|~1~|~1~|~01/SAF~|~Improve Holden Gilmore intersection by adding turn lanes. 102198~|~1~|~1~|~01/STR~|~ADA CR 100 1.61 ER Slide DSR# ADA-002 102198~|~1~|~3~|~03/STR~|~ADA CR 100 6.54 DSR# ADA-004 102198~|~1~|~2~|~02/STR~|~ADA CR 100 3.43 ER Slide repair DSR# ADA-003 117392~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 101149~|~1~|~1~|~01/NHS~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide. 107957~|~1~|~1~|~01/NHS~|~plan split for resurfacing (roadway) work on GRE-35 87352~|~1~|~1~|~01/IMS~|~Priority System minor rehab. on BEL-70-12.61 to 15.72; includes asphalt resurfacing, pavement repairs, guardrail reconstruction, pavement marking 107545~|~1~|~1~|~01/S<2~|~Resurfacing COL-9, COL-14, COL-62 & COL-173 107545~|~1~|~3~|~03/S<2~|~Asphalt resurfacing within the City of Columbiana 107545~|~1~|~2~|~02/STR~|~Resurfacing COL-45 and COL-14 from SLM 12.84 to SLM 19.26 112738~|~1~|~1~|~01/NHS~|~Replace UNI-42-1.45 113114~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work. 101437~|~1~|~1~|~01/IMS~|~This split includes all of MRW IR 71 and most of DEL IR 71 112806~|~1~|~1~|~01/STR~|~Resurfacing, paving over one structure. 111848~|~1~|~1~|~01/BRO~|~KYTC's portion of the project. 111848~|~1~|~2~|~02/BRO~|~OH's Share of the painting project. 114226~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes throughout ATB, MAH and TRU counties. 106267~|~1~|~1~|~01/S<2/Cir~|~Urban Paving - PIC-22-17.34 to 18.28, PIC-56-19.57 to 19.61, PIC-188-0.00 to 0.22 106267~|~1~|~2~|~02/S<2~|~Items to be paid 100% by the City of Circleville 13234~|~1~|~1~|~01/BRO~|~7302193 SCI SR73 1.23 Intersect: Rarden CreekProject Termini: On SR73, begin project .01 mile west of Rarden west corporation limits. Project Description: On SR73, it is proosed to replace the existing deficient structure, SFN 7302193, with a new structure and any necessary approach work. This bridge spans Rarden Creek.Eligible for BR funds. 80% Fed/20% State. 01/BRO/BR/State 95564~|~1~|~1~|~01/NHS~|~Priority System Minor Rehab. of JEF-7; Asphalt resurfacing to address any structural deficiencies, pavement repairs and pavement marking 119597~|~1~|~1~|~01/BRO~|~Bridge Repairs due an accident. 97133~|~1~|~1~|~01/NHS~|~construct left turn lane from US22 to Lakeshore 94279~|~1~|~1~|~01/BRF~|~Bridge on East Circle Lane over Ottawa River in Toledo, SFN 4861760 113655~|~1~|~1~|~01/SAF~|~Safety improvements on Cemetery Rd at the IR 270 interchange 113655~|~1~|~2~|~02/IMS~|~Minor repairs on Cemetery Rd structures over IR 270 113655~|~1~|~3~|~03/NFP~|~100% Local guardrail 120777~|~1~|~1~|~01/NHS~|~SDC Overlay & Expansion Joint Replacement 112601~|~1~|~1~|~01/NFP~|~City of Piqua will construct an extension of Scarbrough Drive from the existing terminus to the west approximately 385 linear feet and match the existing road profile 124315~|~1~|~1~|~01/ENH~|~Reconstruction of sidewalks, drainage, ADA facilities, and street lighting utilizing Federal TAP (80%) and Safety (20%) funds up to Federal maximum. 95445~|~1~|~3~|~03/NHS~|~Bridge maintenance work along SR 16 95445~|~1~|~1~|~01/NHS~|~Addition of general use lanes along SR 37 and SR 16 95445~|~1~|~2~|~02/NHS~|~Replacement of existing pavement along SR 37 and SR 16 95154~|~1~|~1~|~01/NHS~|~Structure damaged by a hit and run accident on December 4, 2012. Project is a heat straightening proejct. 121472~|~1~|~1~|~01/NHS~|~Joint repairs along HAM+CLE US 52 19636~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation of 6003001 MUS IR70 12.58 Intersect: Hamline Avenue #; Not BR Eligible for Rehabilitation: Length=280 SD/FO(2) SR=93.7 DSR=8 119485~|~1~|~1~|~01/NHS~|~Split for bridge work on the NHS 102439~|~1~|~1~|~01/STR~|~Guardrail Replacement on various routes in District 11 102439~|~1~|~2~|~02/NHS~|~Replacement of Type A Anchors and some guardrail along NHS and local NHS routes in District 11. 97452~|~1~|~1~|~01/NHS~|~Turn lane addition 96873~|~1~|~1~|~01/NFP~|~100% State Funds for district wide auxiliary pavement marking. 92857~|~1~|~1~|~01/BRF~|~Bridge replacement 103831~|~1~|~1~|~01/SAE~|~Signal retiming project within the City of Hillsboro. 109911~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded. 91562~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (COL-39-0020, SFN 1502433) with a four-sided precast concrete box. 75643~|~1~|~1~|~01/IMS~|~Plan split for all bridge rehabilitation work associated with the Part 1 Tunnel lighting and joint repair project for structure HAM-71-0134 including design because Part 1 is a Design-Build project. 102528~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of structure at LIC-661-13.94 (SFN 4506693). 88218~|~1~|~1~|~01/NHS~|~Upgrade existing roadway lighting from Stroop to David, replace existing traffic signals at Far Hills/Shroyer and Far Hills/David and one commercial driveway modifications on Far Hills Avenue from the intersection with Stroop Road South to the intersection with Rahn Road. 122827~|~1~|~1~|~01/NHS~|~Plan Split for MVPO funded scope. 122827~|~1~|~2~|~02/NHS~|~Plan Split for ODOT funded scope for work outside of Bryan corp limits. 90811~|~1~|~1~|~01/IMS~|~Four-lane resurfacing project using an asphalt inlay treatment. NOB 77 1.54-6.42. Work includes the NOB 77/78 interchange ramps. 124680~|~1~|~1~|~01/STR~|~Replace culvert 104273~|~1~|~1~|~01/MPO~|~plan split 104273~|~1~|~2~|~02/NFP~|~100% City Items - Specific Bike Rack and Bike Station 121372~|~1~|~1~|~01/SAF/PCEO~|~Perry County Engineer's FY2029 pavement marking project funded by CEAO - 4HB7 @ 100% capped at $50,000.00. 95235~|~1~|~1~|~01/IMS~|~This Plan Split is for mowing interstates and interstate look-a-likes in the SouthWest region. This project is funded at 100% - therefore no plan splits needed for Urban vs Rural locations. 88795~|~1~|~1~|~01/STR~|~Replace deteriorating bridge with minimal approach work on SFN 0600962 AUG 66 1024 over the Saint Marys River. 85997~|~1~|~1~|~01/NHS~|~Whitehall urban paving on Hamilton Rd 85997~|~1~|~2~|~02/NHS/WHIT~|~100% Whitehall funding for pvmt repair 124336~|~1~|~1~|~01/NFP~|~LPA Construction Inspection Task Order. 115472~|~1~|~1~|~01/NFA~|~ODNR Chip Seal project within Great Seal State Park. 124600~|~1~|~1~|~01/SAE/ASD~|~Install new guardrails and upgrade current guardrails on various County Roads. 101558~|~1~|~1~|~01/SAF~|~The project is to construct bumpouts at three corners at Third Street and Perry Street and four corners at Third Street and St. Clair Street in the City of Dayton. 84455~|~1~|~1~|~01/BRO~|~Project Description: It is proposed to replace the deck on SFN 4400062,5.5, over Indian Guyan Creek.Project Termini: 0.40 mile north of CR1005, Old SR243. BR eligible. 80% Fed20% state 01/BRO/BR/State 97947~|~1~|~1~|~01/STR/MCEO~|~"01/STR/OT/MCEO" Muskingum County pavement marking project funded by the CEAO at a project cap of $150,000 87146~|~1~|~1~|~01/STR~|~District 8 bridge painting project for FY2016 on bridge PRE SR725 0800. SFN: 6804209 and intersects: Paint Creek 103166~|~1~|~1~|~01/IMS~|~Split for funding on the interstate 103166~|~1~|~4~|~04/S>2~|~Split for funding on urban routes 103166~|~1~|~3~|~03/STR~|~Split for funding on rural routes. 103166~|~1~|~2~|~02/NHS~|~Split for funding on NHS routes. 122359~|~1~|~1~|~01/STR~|~Bridge replacement at MEG SR 681-14.40 (SFN 5303486) 100176~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 146 17.50. Rural other federal aid funded 80 federal/20 state. 99816~|~1~|~1~|~01/ENH~|~Installation of a shared use path in the grass median on Murray Avenue from Settle Street to Plainville Road. Install a Rectangular Rapid Flashing Beacon (RRFB) at Murray Avenue and Plainville Road. 117528~|~1~|~1~|~01/NHS~|~Bridge liner. 101907~|~1~|~1~|~01/NFA~|~Resurfacing of Bryant Road in Windham Township. 99016~|~1~|~1~|~01/SAF~|~District wide fast dry pavement marking. 100470~|~1~|~1~|~01/NHS~|~Bridges. 94364~|~1~|~1~|~01/STR~|~On US52, 4.01 miles east of SR221 junction, it is proposed to rebuild & stabilize the slope to stop the horizontal and vertical movement. 80/20 split 01/STR/OT/State 122911~|~1~|~1~|~01/NHS~|~Plan split for culvert work on FUL-20-15.077 98202~|~1~|~2~|~02/NFA~|~District Preservation Bridge Funding 4PS7(100% State) - No CAP - 1) Cos-SR 715-03.20; 98202~|~1~|~3~|~03/STR~|~District Preservation Bridge Funding 4PF7(80% Federal) /4PS7(20% State) - No CAP - 1) Cos-SR 93-19.42 98202~|~1~|~1~|~01/STR~|~District Preservation Culvert Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - 1) Cos-541-09.86 2)Cos-SR 541-10.45; 3) Cos-SR 541-11.12; 4) Cos-SR 541-11.73; 5) Cos-SR 541-11.98; 103260~|~1~|~1~|~01/SAF~|~District wide fast drying pavement markers. 84653~|~1~|~2~|~02/NHS~|~Minor bridge work >20' span. 84653~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' span. 84653~|~1~|~1~|~01/NHS~|~Resurfacing. 121991~|~1~|~1~|~01/NFA/KCEO~|~Knox County CEAO Federal/State Exchange Program Funding - 4C87 (80% State with 15% Bridge Credit) / LNTP (5% Local Match) - Replacement of SFN 4237617 carrying over Mile Creek 108490~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 7.63. DSR WAS-015. Rural other federal aid funded 100% federal ER funds. 110470~|~1~|~1~|~01/IMS~|~Maintain structure by milling existing asphalt wearing surface, placing new asphalt wearing surface and clean and paint structural steel. 117165~|~1~|~1~|~01/NFP~|~Created for J&C involvement 101881~|~1~|~1~|~01/SAF~|~Pavement Marking 113254~|~1~|~1~|~01/S<2~|~RIC SR 0061 12.75 Culvert Replacement. 113254~|~1~|~2~|~02/STR~|~RIC SR 0598 00.72 Culvert Replacement or Liner. 100633~|~1~|~1~|~01/S<2~|~Resurfacing COL-14 from the MAH Co. Line (SLM 4.34) to Columbiana (SLM 8.72). Resurfacing COL-14 from SLM 12.67 to 12.83. 100633~|~1~|~2~|~02/STR~|~Resurfacing of COL-14 from SLM 12.83 to the PA State Line. 103412~|~1~|~1~|~01/BRF~|~Replacement of three bridges that have a length over 20 feet and are not on streets on the federal aid system. Federal funds from the Municipal Bridge Program with the match provided by the City of Delphos. After the cap is reached the funding with be provided 100% by the City of Delphos. The percentage of federal funds will be 95% until the cap is reached through the use of Toll Revenue Credit (TRC). 104646~|~1~|~1~|~01/MPO~|~Resurfacing Himrod Ave and Indianola Ave in the City of Youngstown. 90264~|~1~|~2~|~02/NHS~|~Railroad grade separation structure and retaining walls 90264~|~1~|~3~|~03/NFA~|~Service Road A 90264~|~1~|~1~|~01/NHS~|~MAR SR 309 pavement realignment to match new railroad overpass and work on Pole Lane Road at the intersection, including signal reconstruction. 80500~|~1~|~2~|~02/S<2~|~District Preservation Program funds. No local funds. Work inside the Delphos Urban Area but outside the City of Delphos. SR 697 from the Delphos Urban Area Boundary at 5.54 to the end of the project. 80500~|~1~|~1~|~01/STR~|~District Preservation Program funds. No local funds. Work outside the Delphos Urban Area. All of SR 189. SR 697 from 0.00 to Delphos Urban Area Boundary at 5.54. 102792~|~1~|~1~|~01/NHS~|~This plan split is for work on NHS bridges. 93568~|~1~|~3~|~03/S<2~|~Pier encasement and abutment repairs on SFN 4604237 LOG 720 0425. 93568~|~1~|~2~|~02/STR~|~Pier encasement and abutment repairs on SFN 4602617 LOG 274 0616; SFN 5404029 MER 707 0606; SFN 0600121 AUG 29 0767; SFN 0602671 AUG 197 0258; and SFN 5402913 MER 197 0659, SFN 4603605 LOG 508-1.96, SFN 1901728 DAR 118 1303 AND Deck edge repair on SFN 1900668 DAR 47 1206. 93568~|~1~|~1~|~01/NHS~|~Pier encasement and abutment repairs on SFN 4600398 LOG 33 1192 L/R, SFN 4600428 LOG 33 1192R, SFN 4600452 LOG 33 12.26 L, SFN 4600487 LOG 33 12.26 R and SFN 1900900 DAR 49 0728 86838~|~1~|~3~|~03/S<2~|~100% City of Shelby 86838~|~1~|~1~|~01/S<2~|~District Allocation - Urbanized Area outside of Corp Limits (SR 39 SLM 5.45-5.86 RT and 5.78-5.86 LT). 86838~|~1~|~2~|~02/S<2~|~Urban pavement (80/20) - District Allocation/City of Shelby Urbanized Area inside Corp Limits (SR 39 SLM 3.68-3.95, 4.62-5.45 RT, 4.62-5.78 LT). 86838~|~1~|~4~|~04/S<2~|~SFN 7002017 RIC-39-3.68 105751~|~1~|~1~|~01/S>2~|~Multiuse concrete path in the City of Kettering. 116757~|~1~|~1~|~01/S>2~|~Resurfacing. 116757~|~1~|~2~|~02/STR~|~Resurfacing. 121274~|~1~|~1~|~01/STR~|~All Work is within this split 108417~|~1~|~1~|~01/STR~|~Culvert rehab 93951~|~1~|~1~|~01/BRF~|~Replace SFN 5531969 MIA CR0003 0239 with a new approximately 260 Ft. Long, 44 feet fact to face of parapet (47 ft. overall deck width), three span prestressed concrete box or I beam structure. 117704~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 416 over unnamed tributary of Tuscarawas River. 103679~|~1~|~1~|~01/STR~|~Landslide repair on ATH CR 20 2.62-2.69. ER funds 80% Federal and 20% Local. ATH-005. 110430~|~1~|~1~|~01/SAE~|~All the work to construct the roundabout is in this split. Construction Contract subphase funding is 100% federal funds from the safety program SAC 4HJ7. Roundabouts are eligible for 100% federal funds. 110430~|~2~|~2~|~02/STR~|~Bridge Deck Replacement work designed with PID 102671 and will be sold as part 2. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. 116065~|~1~|~1~|~01/NFA~|~Bridge replacement 119874~|~1~|~1~|~01/BRF~|~Plan split for bridge replacement work. 103342~|~1~|~1~|~01/S<2~|~Resurfacing of Bigger Road - Kettering 103342~|~1~|~2~|~02/S<2~|~Concrete removal items, drive approaches, curb and gutter, median and catch basin work. 101448~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr WAY US 30 00.00 - 01.04. 101448~|~1~|~2~|~02/NHS~|~Bridge Work to be determined at a latter date. 99983~|~1~|~1~|~01/S<2~|~USR 36 from Davis Parkway (SLM 8.25) to Sunset Drive/SR 185 (SLM 8.92) - pavement planing and resurfacing of USR 36 within the City of Piqua (1.75 inches) 103253~|~1~|~1~|~01/NHS~|~Overlay on NHS routes. 103253~|~1~|~2~|~02/S<2~|~Overlay on small urban routes. 103253~|~1~|~3~|~03/STR~|~Overlay on rural routes. 88847~|~1~|~1~|~01/NFA~|~District Allocation - Bridge Replacement.Not on Federal Aid System so we must use state funds 97591~|~1~|~1~|~01/STR~|~BRO US 52 10.17-10.20 Slide Repair 107807~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 26 12.32-12.35. 100% Federal ER funded. 114534~|~1~|~1~|~01/NFP~|~D09 Bridge Maintenance FY27 124642~|~1~|~1~|~01/IMS~|~Pavement replacement. 77260~|~2~|~5~|~05/BRO~|~90/10 IM Replacement two structures (no added capacity), TRU IR80 1.91 L/R. SFN# 7803397 and SFN# 7803427. 77260~|~2~|~6~|~06/BRO~|~80/20 NHS Widening of two structures (added capacity). TRU-IR80-1.91 L/R. SFN# 7803397 and SFN# 7803427. 77260~|~2~|~7~|~07/IMS~|~90/10 IM Pavement replacement from existing mainline from SLM 1.68 to SLM 2.18. Trumbull County, Ohio. 77260~|~3~|~9~|~09/IMS~|~Full depth concrete repairs of MAH-IR80 from SLM 0.16 to SLM 4.50 in Mahoning County, Ohio. 77260~|~1~|~1~|~01/IMS~|~90/10 IM split covering the replacement of existing mainline pavement from West of SR-680 interchange to bridges over SR193 (Belmont Ave) except for new pavement replaced under Part 2 (SLM 1.68 to 2.18). 77260~|~1~|~2~|~02/NHS~|~80/20 NHS split covering additional lanes from West of IR-680 interchange to the bridges over SR193 (Belmont Avenue), except for pavement included in Part 2 (SLM 1.68 to 2.18). 77260~|~2~|~8~|~08/NHS~|~80/20 NHS split covering additional lanes from SLM 1.68 to SLM 2.18. Trumbull County, Ohio. 77260~|~1~|~4~|~04/IMS~|~Construction of five noise walls. 77260~|~1~|~3~|~03/IMS~|~90/10 IM split for the rehab of fourteen structures. 5002583 & 5002613, MAH-80-5.17 over MVSD. 5002648, MAH-80-565 under Four Mile Run. 7803303, TRU-80-0.96 under Salt Springs. 7803338 & 7803362 over Mahoning River and CSX. 7803516, TRU-80-2.47 under Pedestrian Walkway. 7803540, TRU-80-2.66 over Little Squaw Creek. 7803729 & 7803753, TRU-80-3.57 over SR711. 7803788, TRU-80-4.01 over Liberty Street. 7803605, TRU-711-1.03 over IR80 EB. 7803664, TRU-711-1.03 over IR80 EB. 7803699, TRU-711-1.16 over IR80 WB. 100572~|~1~|~2~|~02/STR~|~LAW 775 (2.76-7.24) 100572~|~1~|~3~|~03/S<2~|~Bridge plan split placeholder. 100572~|~1~|~1~|~01/S<2~|~LAW 775 (1.20-2.76)LAW 7 (3.41-6.36) 114784~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4. 114421~|~1~|~1~|~01/S<2/CAR~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 108619~|~1~|~4~|~04/ENH~|~Formliner Logo and Test Panel using 100% local funds 108619~|~1~|~1~|~01/SAF~|~Replace traffic signals at NB and SB ramp intersections 108619~|~1~|~2~|~02/SAF~|~Install wrong-way detection system at ramps and overhead lane utilization signage on SR725 108619~|~1~|~3~|~03/MPO~|~Add Sidewalk on SR 725. Alternates for pedestrian lighting upgrade and tinted concrete formliner sealer. 83666~|~1~|~1~|~01/STR~|~Reconstruct Duvall Rd/TR-20 into SR-762 from US-23 to Ashville Pike/CR-28All items except Structure>20' (RR bridge) and Retaining Wall (necessary for RR bridge) 83666~|~1~|~2~|~02/STR~|~New Structure>20' & Retaining WallSFN 6504708, PIC-762-12.79, over NS & CSX RR's 116470~|~1~|~1~|~01/MPO/STRE~|~Resurfacing, in the city of Streetsboro. 98870~|~1~|~1~|~01/MPO~|~Adding sidewalks to Wendy Place, Natale and Portal Drives near school. 103302~|~1~|~1~|~01/NFP~|~Split for traffic signal work 97719~|~1~|~1~|~01/MPO~|~local funds 102588~|~1~|~1~|~01/S<2~|~Work inside the Lima Urbanized Area but outside the City of Lima. On SR 117 from the beginning of the project at 19.96 to the Lima Urbanized Boundary at 21.32. State and federal funds from the District Preservation Program budget. No local funds. 102588~|~1~|~3~|~03/NHS/LIMA~|~Work on SR 81 in Allen County on both sides of the road from Jackson Street at 17.01 to where SR 81 leaves the City of Lima on the left side of the road at 17.88 and on the right side of the road from 17.88 to where SR 81 leaves the City of Lima on the right side of the road at 18.17. The federal NHS funds are from the District Preservation Program budget. The 20% match will be provided by the City of Lima. 102588~|~1~|~2~|~02/STR~|~Work on the entire length of SR 103 in Allen County from 0.00 to 2.04; on SR 117 in Allen County from the Lima Urbanized Boundary at 21.32 to the end of the project at 28.61; on US 127 in Defiance County from the Paulding County Line at 0.00 to the Williams County Line at 12.16; on SR 2 in Defiance County from the Indian State Line at 0.00 to SR 49 at 2.34; on SR 18 in Defiance County from the Indiana State Line at 0.00 to Meuse Argonne St in the Village of Hicksville at 2.82; on SR18 in Defiance County from SR 2 at 3.52 to the ECL of Hicksville at 4.18; and on SR 49 in Defiance County from the SCL of Hicksville at 2.02 to SR 2 at 2.63; on SR 37 in Hancock County from the south to the north corporation limits of the Village of Mt. Blanchard; on SR 103 in Hancock County from the Allen County line at 0.00 to Pocono Drive at 0.91 and on SR 568 in Wyandot County from the Hancock County line at 0.00 to US 23 at 4.93. All funds from the District Preservation Program budget. No local funs. 102588~|~1~|~4~|~04/NHS~|~Work on SR 81 on the left side of the road from where SR 81 leaves the City of Lima on the left side to then end of the work on SR 81 at 18.17 where SR 81 leaves the City of Lima on the right side of the road. All funds are from the District Preservation Program budget. No local funds. 82787~|~1~|~1~|~01/SAF~|~Reconstruct the Old Mill Road / Stow Road intersecton 200 feet south and 500 feet west of the the bridge. 91702~|~1~|~1~|~01/NHS~|~Hydrodemolition of deck with mivro silica overlay. Minimum approach work excet approach slabs. SFN 1202820 CLA US 68 7.73 Ramp F over Conrail RR and SFN 1202677 Br. No. CLA-68-0738R Ramp C over the Mad River. 104700~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Deck overlay and abutment repair on SFN 6001777 MUS-60-14.01. Not BR Eligible: Length = 112; SD/FO (0); DSR = 7; SR = 74.0; 102022~|~1~|~1~|~01/NFP~|~District 4 one year contract for mowing along interstate and interstate look-a-likes throughout ATB, MAH, POR and TRU Counties. 87092~|~1~|~1~|~01/S>2~|~PLan Split for the Urban portion of the porject. This is includes CLE-131 between SLM 0.25-5.73 87092~|~1~|~2~|~02/STR~|~Plan Split for the Urban portion of the porject. This is includes CLE-131 between SLM 5.73-8.51 111081~|~1~|~1~|~01/STR~|~Repair failed outlet of clay pipe encased in concrete. 99793~|~1~|~1~|~01/NHS~|~NHS split for resurfacing work. Eligible work to be funded at 80% federal / 5% state /15% local. 99793~|~1~|~2~|~02/NFP~|~100% local cost 84731~|~1~|~1~|~01/SAF~|~Clough Pike from Mt. carmel-Tobasco Rd. to Glen-Este Withamsville Rd. The project will add a center turn lane and four foot paved shoulders for a total pavement width of 44 feet. Type 6 curb storm sewers and will be constructed for drainage , also sidewalks will be planned (north side) for future OKI Transportation Enhancement Grant oppurtunities. 84731~|~2~|~2~|~02/ENH~|~Clough Pike from Mt. carmel-Tobasco Rd. to Glen-Este Withamsville Rd. The project will add a center turn lane and four foot paved shoulders for a total pavement width of 44 feet. Type 6 curb storm sewers and will be constructed for drainage , also sidewalks will be planned (north side) for future OKI Transportation Enhancement Grant oppurtunities. 98627~|~1~|~1~|~01/BRF~|~OBPP Design/Build bridge replacement of SFN 7033990 97675~|~1~|~1~|~01/NFA~|~District HQ air handling unit replacement 96638~|~1~|~1~|~01/STR~|~It is proposed to having a mowing contract on 4-lane highways for portions or all of Distict 9.Contract is for FY 2014 (3rd qtr FY14) to FY16 (2nd qtr FY16). 123542~|~1~|~1~|~01/NHS~|~NHS Plan Split 123542~|~1~|~2~|~02/S>2~|~STP > 200,000 plan split 113115~|~1~|~1~|~01/BRF~|~Replace bridge structure on CR76 at SLM 4.51 - OBPP project 96053~|~1~|~1~|~01/IMS~|~IM funding for pavement reconstruction, no added capacity (60% of pavement and roadway costs, for items not specifically identified in other splits). 96053~|~1~|~2~|~02/NHS~|~NH funding for pavement construction, added capacity (40% of pavement and roadway costs, for items not specifically identified in other splits), 96053~|~1~|~3~|~03/IMS~|~IM funding for structure replacement, no added capacity:FRA-33-1747 (Third Street over 70/71)FRA-23-1075 (Fourth Street over 70/71) 96053~|~1~|~4~|~04/ENH/Cols~|~MORPC/Columbus funding for aesthetic enhancements on Third St bridge caps, Fourth St bridge, also landscaping along Fulton, Third and Fourth Streets 96053~|~1~|~5~|~05/NHS/Cols~|~Items to be paid with 100% City of Columbus funding 96053~|~1~|~6~|~06/NHS/Cols~|~Incremental items - Columbus to pay the difference above standard items including brick paver crosswalks, granite curbs 96053~|~1~|~7~|~07/NHS/Cols~|~100% AEP items to be done as part of the project 96053~|~1~|~8~|~08/NHS/Cols~|~100% AT&T items to be done as part of the project 96053~|~1~|~10~|~10/NHS/Cols~|~100% Charter Spectrum items to be done as part of the project 96053~|~1~|~9~|~09/NHS/Cols~|~100% Lumen (Century Link) items to be done as part of the project 90591~|~1~|~1~|~01/IMS~|~Plan split for all work on the structures 90591~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 105165~|~1~|~1~|~01/STR~|~Resurfacing on CLI-28 and CLI-73. 120813~|~1~|~1~|~01/STR~|~Guardrail maintenance. 102329~|~1~|~5~|~05/IMS/AKRO~|~100% Akron items for (SFN 7703368) Princeton St. bridge over I-76 aesthetics (sidewalks, lighting, fence) in the City of Akron. 102329~|~1~|~3~|~03/IMS~|~Minor bridge work > 20' span. 102329~|~1~|~4~|~04/NHS~|~Minor bridge work > 20' span. 102329~|~2~|~7~|~07/IMS~|~Constructing two new flyover bridges in the central interchange. 102329~|~1~|~1~|~01/IMS~|~Pavement replacement on SUM IR 76 from 8.24 to 10.00 and SUM IR 77 from 9.74 to 11.54 and 15.18 to 15.87. 102329~|~1~|~2~|~02/NHS~|~Pavement resurfacing and of SR 8 from 0.63 to 1.75. 102329~|~1~|~6~|~06/IMS~|~Deck replacements > 20' span. 102329~|~2~|~8~|~08/IMS~|~Bridge Rehab work > 20' span. 102329~|~2~|~11~|~11/IMS~|~Removal of Lafollette structure, replaced with pedestrian structure. 102329~|~2~|~9~|~09/IMS~|~Pavement replacement on SUM IR 76 from 10.99 to 12.23 and SUM IR 77 from 11.54 to 12.11 102329~|~2~|~10~|~10/NHS~|~Pavement resurfacing and widening on SR 8 from 0.00 to 0.63. 102329~|~1~|~12~|~12/NFA~|~Retroactive fuel price adjustment 92964~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KNOX" - Knox County bridge replacement 122460~|~1~|~2~|~02/BRO~|~Second plan split for construction contract costs above the Project Cap for 4PR7 (PROTECT) Funds. 122460~|~1~|~1~|~01/BRO~|~PROTECT bridge carrying Exit Ramp J over the Big Stillwater Creek by placing Rock Channel Protection to correct Scour. 102155~|~1~|~1~|~01/MPO~|~Chessie Circle connector 83442~|~1~|~1~|~01/NHS~|~Bridge Maintenance 93836~|~1~|~1~|~01/NFA~|~Bridge replacement project. VIN 328 9.93, SFN 8202672. Not on any federal aid system funded 100% state. 98655~|~1~|~1~|~01/S<2~|~Pavement replacement, new curb, gutter and sidewalk. Upgrade of signals at SR 61 and US 250 on Milan Ave. 98655~|~1~|~2~|~02/ENH~|~Waterline, 100% local items. 106130~|~1~|~1~|~01/NFA~|~Landslide repair, MRG 669 10.85. Not on any federal aid system funded 100% state. 110059~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 25 & 26 95879~|~1~|~1~|~01/NFA~|~At SLM 0.68 on TR403 (Turkey Run Road) it is proposed to build a new structure to replace the low-water crossing. This is funded under SAFETEA-LU and the plan package must be completed and filed by July 1, 2015 with construction in FY2016. 114230~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4. 101375~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 167 0.00 to 3.29. 101375~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 101375~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 116157~|~1~|~1~|~01/NFA~|~Plan Split 01/NFA/PV/ 116157~|~1~|~2~|~02/STR~|~Plan Split 02/STR/PV/ 93709~|~1~|~2~|~02/S>2~|~Culvert Replacement LOR-252-04.34 93709~|~1~|~3~|~03/STR~|~Culvert Replacement LOR-303-08.42 93709~|~1~|~1~|~01/NHS~|~Culvert Replacement LOR-020-01.06 122889~|~1~|~1~|~01/NHS~|~C.O. Major Rehab funds, pavement and conduit work included. 122889~|~1~|~2~|~02/NHS~|~C.O. Major Rehab funds, bridge work only. 114188~|~1~|~1~|~01/STR~|~Slide repair 96855~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various Crawford County roads. 98932~|~1~|~1~|~01/S>2~|~Glendale 124911~|~1~|~1~|~01/NHS~|~Culvert replacement. 124447~|~1~|~1~|~01/SAF~|~Safety items. 114967~|~1~|~1~|~01/NHS~|~Resurfacing. 114967~|~1~|~2~|~02/S>2~|~Resurfacing. 121898~|~1~|~1~|~01/SAF~|~Install raised crosswalks. 96078~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge replacement of SFN 2303426 FAI-664-2.16; Not BR Eligible: Length=93 SD/FO(0) SR=78.1 DSR=6 92443~|~1~|~1~|~01/CMQ~|~Construction of turn lane on SR-46 at new South Range school complex, resurfacing of SR-46 from SLM 4.42 to SLM 4.80, in Mahoning County, Ohio. 118468~|~1~|~1~|~01/NHS~|~Concrete Repair on MED-224-15.27 to 15.586 (MED-224 at Lake Rd intersection) 93690~|~1~|~1~|~01/STR~|~For all work other than the section of SR 67 that is in the City of Upper Sandusky. All funds from the District Preservation Program budget. 4PF7 (80% Federal)/4PS7 20% State - No Cap 93690~|~1~|~2~|~02/S<2/USAN~|~Work on SR 67 in the City of Upper Sandusky. From SR 53 SLM 17.60 to the corporation limits at 18.15. Only the south side of the road is in the city and in this plan split. The 80% federal funds will be from the District Preservation Program budget. The 20% match will be provided by the City of Upper Sandusky. 99613~|~1~|~1~|~01/IMS~|~Provide new concrete overlay on BEL-470-0239 (SFN 0706221) 102943~|~1~|~1~|~01/NFP~|~Guardrail Maintenance 84829~|~1~|~2~|~02/S<2~|~District Allocation Funds for Pavement Replacement Project (Village of Sheffield). SLM 26.67 to 26.69 84829~|~1~|~1~|~01/S<2~|~Pavement Replacement.Priority 1 - Lorain Co. TID SLM 26.67 TO 27.34Priority 2 - Jobs and Commerce SLM 26.67 TO 27.34Priority 3 - Fed/Local(OPWC) SLM 26.67 TO 27.34, 4PF7 capped at $350,000Priority 4 - Local(OPWC) SLM 26.67 TO 27.34Priority 5 - Local(4BG7) SLM 26.67 TO 27.34OPWC capped at 31% or $450,000, whichever is less. 97589~|~1~|~1~|~01/NFP~|~Split 116341~|~1~|~1~|~01/STR~|~plan split for the rural sections 116341~|~1~|~2~|~02/S5K~|~plan split for the small urban section 96980~|~1~|~1~|~01/S>2~|~Signal upgrade at SR 446 84017~|~1~|~1~|~01/STR~|~general system resurfacing, pavement repairs, pavement marking 97813~|~1~|~1~|~01/NFP~|~Various bridges. 116201~|~1~|~1~|~01/BRO~|~Plan split for bridge 119133~|~1~|~1~|~01/BRF/STCE~|~Bridge replacement. 121963~|~1~|~1~|~01/SAF~|~Safe. 115757~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on HAM-22 115757~|~1~|~2~|~02/S>2/MONT~|~Plan split for the 100% City items on the urban paving on HAM-22 85113~|~1~|~3~|~03/STR~|~Resurfacing SR 43 from SLM 9.50 to 11.07. Includes all resurfacing work on SR 150 and SR 647 in Jefferson County. 85113~|~1~|~2~|~02/S<2~|~Resurfacing SR 43 from SLM 9.38 to 9.50. 85113~|~1~|~1~|~01/NHS~|~Resurfacing SR 43 from SLM 5.58 to 9.38 near Wheeling-Bridgeport and Steubenville-Weirton urban areas. 113435~|~1~|~1~|~01/SAF~|~Part 1: Pedestrian improvements along Main St 113435~|~2~|~2~|~02/SAF~|~Part 2: Improvements at two roundabouts on Main St 113435~|~2~|~3~|~03/SAF~|~Part 2: 100% City items for the roundabout improvements 97115~|~1~|~1~|~01/BRF~|~The replacement of SFN5342295 and 5632951. 119345~|~1~|~1~|~01/IMS~|~Resurfacing. 108407~|~1~|~1~|~01/S<2/TRNT~|~Landslide repair from OH18-01 ER event. 95238~|~1~|~1~|~01/MPO~|~MPO-STP funds. 80% Fed.(SAC 4TA7) - 20% Local OPWC (SAC 4BG6) 95238~|~1~|~2~|~02/CMQ~|~MPO-CMAQ funds. 80% Federal (SAC 4TB7) and 20% Local OPWC(SAC 4BG6). For CMAQ eligible work to install sidewalks. 82403~|~1~|~1~|~01/MPO~|~Widen TR229/Bixby Rd from Ebright Rd to US-33. Add street lights, sidewalks/mulituse path.Local Sponsor - FRA County Engineer 106534~|~1~|~1~|~01/NFA~|~ADA CR 9B 30.40 (SFN 0133019) 115685~|~1~|~1~|~01/BRO~|~Work associated with rehab of Beecher Gamble over 33 structure. 115685~|~1~|~2~|~02/ENH~|~Install Pedestrian Hybrid Beacon and sidewalk along SR 750 115685~|~1~|~3~|~03/S>2~|~Extend curb and gutter along SR 257 101729~|~1~|~1~|~01/NFP~|~Place protective netting on structures 93747~|~1~|~1~|~01/SAF~|~Construct widened shoulder along Indian Trail with street lighting, Install four-way stop at the intersection of Park Avenue and N Parkway Drive with ADA compliant curb ramps. Install new and repair deteriorated sidewalk with ADA compliant curb ramps along Scott Street, Walker Street and Gill Street. Remove traffic signal installations and replace with rectangular rapid fladhing beacons and ADA compliant curb ramps at intersections along Broadway Street, W. Greene Street and N. College Street. 112773~|~1~|~2~|~02/SAF~|~Plan split 2 for the large urban location:HAM-22 & Finley Ln 112773~|~1~|~1~|~01/SAF~|~Plan split 1 for the interstate locations: HAM-74 intersection & HAM-128HAM-275 & Mosteller Rd 112773~|~1~|~3~|~03/SAF~|~Plan split 3 for the NHS location: BUT-27 & Stillwell Beckett Rd 112773~|~1~|~4~|~04/SAF~|~This plan split 3 is for the rural location:HAM-128 & New Haven Rd 99219~|~1~|~1~|~01/NFA~|~Adding J&C Funding Event. 117656~|~1~|~1~|~01/S50~|~Bridge repair needed due to strike accident 95821~|~1~|~1~|~01/STR~|~STP Rural, HOL-514-4.53 culvert repair/replacement. 110126~|~1~|~1~|~01/IMS~|~Interstate Plan Split 95342~|~1~|~1~|~01/STR~|~Culvert Project on SR772Culvert replacement at PIK 772 0.98 & ROS 772 2.50 116846~|~1~|~1~|~01/ENH~|~Add sidewalks and lighting. 109243~|~1~|~1~|~01/SAE/TUS~|~Pavement marking on various county routes with 100% CEAO Safety funding (4HB7). 105674~|~1~|~1~|~01/IMS~|~AC overlay with repairs on CLE IR 275 0.00 to 6.51. 93800~|~1~|~1~|~01/STR~|~Replace Brdge 0103934Project Termini: Located 1.91 miles south of SR137 on SR247. Project Description: It is proposed to replace the structure. 80/20 split01/STR/BR/State 104493~|~1~|~1~|~01/MPO~|~plan split 108400~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 25.90. DSR WAS-014. Rural other federal aid funded 100% federal ER. 122394~|~1~|~1~|~01/NFA~|~Plan split for resurfacing Maumee River Weir Rapids 120461~|~1~|~1~|~01/SAF~|~Guardrail replacement project. Various routes in Vinton County. Funded 100% Federal. 120461~|~1~|~2~|~02/SAF~|~Guardrail replacement project Part 2. Funded 100% Federal. 97484~|~1~|~1~|~01/NHS~|~LAW US 52/ Solida Rd Interchange. 104239~|~1~|~1~|~01/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the Steel Deck Grating on SFN 6000495, Mus-US-22-11.59 96314~|~1~|~1~|~01/IMS~|~IR Bridge Funds 90/10 Fed/State. Non-BR eligible 91746~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a fine graded polymer treatment. MEG 124 12.49-16.67, 27.77-29.55. Rural other federal aid funded Federal 80% and State 20%. 91746~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a fine graded polymer treatment. MEG 124 20.62-27.77. Urban other federal aid funded Federal 80% and State 20%. 112834~|~1~|~1~|~01/STR~|~Spot paving various locations throughout District 11. 121872~|~1~|~1~|~01/NHS~|~All work included in this split. 106960~|~1~|~1~|~01/STR~|~Construct IR 71 NB and IR 71 SB entrance ramps and extend Sunbury Parkway to 3B's & K Rd (Plan splits will be needed for NHS and STP as project develops) 98057~|~1~|~1~|~01/NFA~|~Adding CO CO Contr Phase 76463~|~1~|~2~|~02/NHS~|~Asphlat overlays, patching, sealing:6501028 PIC US23 14.1 Intersect: Cook Ditch6501052 PIC US23 14.53 Intersect: Walnut Cr6501087 PIC US23 14.53 Intersect: Walnut Cr6501117 PIC US23 20.28 Intersect: Bulen Ditch02/NHS/BR/ 76463~|~1~|~1~|~01/NHS~|~Minor rehab of pavment PIC-23: 12.92-23.1601/NHS/PV/ 108092~|~1~|~1~|~01/IMS~|~Bridge rehab on interstate route bridge. 108092~|~1~|~2~|~02/S>2~|~Bridge rehab on large urban route bridge. 108092~|~1~|~3~|~03/NHS~|~Overlay using hydrodemolition 95400~|~1~|~1~|~01/ENH~|~Reconstruction of two concrete stairways to Walnut Beach and Point Park at Ashtabula Harbor, Ashtabula County, Ohio. 88410~|~1~|~1~|~01/NHS~|~Bridge replacement project. VIN 93 1.26. SFN 8200904. NHS route funded 80 federal/20 state. 101580~|~1~|~1~|~01/S<2~|~DSR#JEF-015 116965~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 218 14.77 (CFN 1820295), GAL 554 10.53 (CFN 1833135) and GAL 588 6.42 (CFN 1831201). 87295~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on the Rural portions of SR 126 in Bulter County. The limits of the Rural portion are on SR 126 between SLM 0.0 to 7.66. 95978~|~1~|~1~|~01/NFP~|~Construction of fabric salt building. 116016~|~1~|~1~|~01/STR~|~All work in this project. Funds will be from the Geologic Site Management (GSM) program until the cap is reached then funds from the District Preservation Program budget will be used. 110075~|~1~|~1~|~01/IMS~|~DEL 23 from 10.63 to 10.81, DEL 23 from 17.75 to 17.85 92647~|~1~|~1~|~01/SAF~|~90/10 - Safety Funds (capped) / Priority 2 is 100% 4BG7 (Erie County) 92647~|~1~|~2~|~02/SAF~|~100% State Funds (4BC7) for Pavement Fabric 92647~|~1~|~3~|~03/SAF/ERI~|~Waterwork Erie County Department of Environmental Services is responsible to pay for. 91519~|~1~|~1~|~01/NHS~|~Replace both structures (not BR eligible for replacement)SFN 5100542, MAR-23-7.66R, Grave CkSFN 5100518, MAR-23-7.66L, Grave Ck 112825~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 97327~|~1~|~2~|~02/NHS~|~"02/NHS/CV/ " - District Preservation Culvert Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Culvert liner on: 1) Mus-SR 16-05.54; 2) Mus-SR 16-08.04; 3) Mus-SR 16-08.22; 4) Mus-SR 16-11.12; 97327~|~1~|~3~|~03/STR~|~"03/STR/CV/ " - District Preservation Culvert Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Culvert liner on: 1) Cos-SR 83-07.94; 2) Cos-SR 83-07.96; 97327~|~1~|~1~|~01/IMS~|~"01/IMS/CV/ " - District Preservation Culvert Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Culvert liner on Mus-IR 70-03.88; 104021~|~1~|~1~|~01/NFA~|~TR-185 91952~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. Funds for 1 year 99852~|~1~|~1~|~01/MPO~|~Covers work to widen Hamilton Rd, Morse Rd, and to add multi use path. 117940~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties. 111630~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items within construction and CE to be paid with SAC 4TA& (NOACA) 121277~|~1~|~1~|~01/STR~|~All Work is within this split. 87033~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping. 99748~|~1~|~1~|~01/IMS~|~Construction Inspection 86893~|~1~|~2~|~02/SAF~|~100% State Safety - Pavement Fabric 86893~|~1~|~1~|~01/SAF~|~Intersection Improvement - Add Lanes 103134~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY18 Construction Engineering Services 103134~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY19 Construction Engineering Projects 103134~|~1~|~3~|~03/STR~|~Plan split for D5 projects. 103134~|~1~|~4~|~04/STR/1~|~Plan split 4 for FY 21 Construction Engineering Projects 123955~|~1~|~1~|~01/STR~|~geotech engineering. 98391~|~1~|~2~|~02/NHS~|~Minor Bridge Work on SFN 7605021 STA 93 11.87 over branch of Tuscawaras River 98391~|~1~|~1~|~01/NHS~|~Resurfacing STA 93 11.71 to 12.43 106857~|~1~|~1~|~01/NFP~|~Rehabilitation and resurfacing of various park roads and parking lots within Winton Woods Park in Hamilton County, OH. 119858~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded scope items to address sidewalk gaps and related improvements. 93190~|~1~|~1~|~01/S>2~|~General system paving of DEL750: 4.43-7.06 124551~|~1~|~1~|~01/NHS~|~Conduit 112991~|~1~|~1~|~01/NHS~|~Spot Paint and rehab sound wall of 3118460. Spot paint 3104923. Paint, replace joints, and seal SFN's 3104990, 3105008,3105024. Repair sound wall on 3104915. 109227~|~1~|~1~|~01/NHS~|~Pavement Replacement Cost 109227~|~1~|~3~|~03/NHS~|~MED-42-2090 SFN: 5201772 (Small Ditch)Length: 14' (FHWA does not classify this as a bridge)Excavate down and rebuild top of leaking box culvert structure, under existing guardrail location. Waterproof the repaired area and under the nearby sanitary line. This area is on the east side guardrail. It is either beneath the guardrail or the existing 21" diameter sanitary line which is inside the 30" steel casing pipe. 109227~|~1~|~2~|~02/NHS~|~MED-42-1986 SFN: 5201721 (W Branch of Rocky River)PN 512, Item Special - Repair approach slab at forward abutment in NB lane near outside lane line - Type B or C. Item 516 - Repour 516 joint between repaired slab and backwall (This may have been patched since 2020 - Designer to verify)Replace all type 5 guardrail panels on bridge. They are rusting out. 115853~|~1~|~1~|~01/NFP~|~Created for J&C involvement 114208~|~1~|~1~|~01/NHS~|~ROS 35 20.42 SFN 7102194 bridge repair 121507~|~1~|~1~|~01/BRF~|~UNI CR 67 3.408 Bridge Replacement over Big Darby Creek 94667~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 676 0.00-4.30. Not on any federal aid system funded 100% state. 94667~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 676 0.00-1.97 and WAS 676 4.30-12.27. Rural other federal aid funded 100% state. 109269~|~1~|~1~|~01/NFA~|~PIK CR VAR PM FY24 97187~|~1~|~1~|~01/NHS~|~Ohio's portion of the project. 97187~|~1~|~2~|~02/NHS~|~KYTC's Share of the project. 94167~|~1~|~1~|~01/BRO~|~Deck overlay & abutment repair on structure - BR eligible SFN 2101629, DEL-37-22.13, over Priaire Run 120451~|~1~|~1~|~01/S>2~|~Bridge Rehabilitation on TR 221 (Benedict Rd) SFN: 5932602 96193~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7. 110755~|~1~|~1~|~01/STR~|~Work to resurface Aquilla Road that is eligible for federal-aid for the rural portion 110755~|~1~|~2~|~02/S>2~|~Work to resurface Aquilla Road that is eligible for federal-aid for the urban portion 80121~|~1~|~1~|~01/S<2~|~District Allocation 95261~|~1~|~1~|~01/SAF~|~Relocate CR 20 and TR 224 on ATH 690 1.60 to improve sight distance. Safety project. Funded 100% state. 97122~|~1~|~1~|~01/BRF~|~The replacement of SFN# 245607 97122~|~1~|~2~|~02/BRO~|~The replacement of SFN# 0254134 & 0254118 99866~|~1~|~1~|~01/NHS~|~Remove and replace existing culvert. 125013~|~1~|~1~|~01/SAF~|~Guardrail replacement/installation on HOC CR 300 0.00-2.41. Funded 100% Federal. 96139~|~1~|~1~|~01/NFA~|~Construct a new 1,000 ton salt storage building at a new St. Marys Yard Facility. 123566~|~1~|~1~|~01/SAF~|~Lighting replacements along HAM-71 99227~|~1~|~1~|~01/S<2~|~Mill 1.5" and resurfacing of CR-7 (Farmers Road) and CR-8 (Cuba Road), within the City of Wilmington small urban boundary. 99227~|~1~|~2~|~02/STR~|~Mill of 1.5" and resurfacing of CR-7 (Farmers Road), CR-8 (Cuba Road), and CR-19 (Second Creek Road) outside the small urban boundary of Wilmington with 2" of new asphalt. 99227~|~1~|~3~|~03/NFA~|~This plan split covers the improvements on the off-system portion of Cuba Road (SLM 0.56 to SLM 4.07). 88511~|~1~|~1~|~01/STR~|~Resurface section sWOO US6 11.71-12.71; 12.94-13.74; 14.81-21.04 on this plan split 88511~|~1~|~3~|~03/S<2~|~SFNs: 8700214, 8700249, 8700273, 8700303, 8700338, 8700362. 88511~|~1~|~4~|~04/STR~|~SFNs 8700427, 8700451 88511~|~1~|~2~|~02/S<2~|~This is on US-6 from SLM 12.71 to 12.94 in Bowling Green and 14.58 to 14.81 - Urban Paving 124904~|~1~|~1~|~01/NFP~|~Plan Split for TSMO related work 105089~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan Split 1 105089~|~1~|~2~|~02/NFA~|~02/NFP/PV/ - Plan Split 2 108542~|~1~|~1~|~01/S>2~|~Pedestrian enhancement improvements that are eligible for federal-aid from NOACA's TLCI Implementation Program 108542~|~1~|~2~|~02/NFP~|~City requested work items that is not-eligible for federal-aid 84543~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. VIN 160 0.00-3.69 and VIN 349 0.00-1.28. Federal 80% and State 20%. 98152~|~1~|~1~|~01/STR~|~SR 327 (6.08-6.10)SR 327 (11.61-11.62)80/20 Federal/State 98152~|~1~|~3~|~03/NHS~|~SR 327 (7.26-7.64)80/20 Federal/State 98152~|~1~|~2~|~02/S<2~|~SR 327 (6.10-6.76) (7.22-7.26) (11.60-11.61)SR 124 (17.09-17.55)80/20 Federal/State 98152~|~1~|~4~|~04/NHS~|~SR 327 8.48 (SFN 4003543)80/20 Federal/State 98152~|~1~|~5~|~05/NHS~|~SR 327 (7.64-8.93)80/20 Federal/Local 98152~|~1~|~6~|~06/S<2~|~SR 327 (9.79-11.60)80/20 Federal/Local 98152~|~1~|~7~|~07/NHS~|~100% Local for curb ramps & full depth repair. 115232~|~1~|~1~|~01/ENH~|~Multi use path. Funding from the Transportation Alternatives Program (TAP). After the TAP cap is reached all funds will be 100% local funds provided by the City of Findlay. 109596~|~1~|~1~|~01/SAF~|~Plan Split for Safety improvements 109596~|~1~|~2~|~02/NFP~|~Landscaping 86293~|~1~|~1~|~01/BRO~|~Bridge replacement over Sugar Creek. SFN 4903935 84388~|~1~|~1~|~01/NHS~|~NHS Plan Split for preventative maintenance paving 114189~|~1~|~1~|~01/NFA~|~Slide repair 98036~|~1~|~1~|~01/NFA~|~Adding Construction Contract subphase 100238~|~1~|~1~|~01/MPO~|~Repair and resurface Snow Road using MPO STP funds with 80% federal participation with 20% local matching funds. 122899~|~1~|~1~|~01/ENH/NFAL~|~Bridge preventive maintenance. 106981~|~1~|~1~|~01/SAF~|~Install left-turn lanes in both directions on US 22 at Zoar Rd 106981~|~1~|~2~|~02/NFP~|~Plan split for Greater Cincinnati Water Work installation of water line through the project limits as part of this construction contract. 106981~|~1~|~3~|~03/NFP~|~Plan split for Warren County Water & Sewer installation of water line through the project limits as part of this construction contract. 101844~|~1~|~1~|~01/SAE~|~Upgrade crosswalks, install countdown signals and RRFB's at various locations in 11 jurisdictions in Franklin, Delaware, and Fairfield counties 105705~|~1~|~2~|~02/SAF~|~School flashers for Solomon Lutheran; Abbreviated safety Application D02-2020-06 105705~|~1~|~1~|~01/SAF~|~Plan split for WOO-795-2.39 traffic signal 107630~|~1~|~1~|~01/IMS~|~Replacement of existing pavement and misc items (68%) 107630~|~1~|~2~|~02/IMS~|~Pavement and misc items associated with Pavement widening (32%) 107630~|~1~|~3~|~03/IMS~|~Items associated with the removal and replacement of existing bridges (68%) 107630~|~1~|~4~|~04/IMS~|~Bridge work associated with bridge widening (32%) 107630~|~1~|~5~|~05/IMS~|~Items associated with Bridge Rehab on SFNs 4901959, 4903455, 4903544, 6501869 and 6501893 107630~|~2~|~6~|~06/IMS~|~Replacement of existing pavement and miscellaneous items (69%) 107630~|~2~|~7~|~07/IMS~|~Pavement and Misc Items associated with pavement widening (31%) 107630~|~2~|~8~|~08/IMS~|~Items associated with the removal and replacement of existing bridges (69%) 107630~|~2~|~9~|~09/IMS~|~Items associated with widening of bridges (31%) 107630~|~2~|~10~|~10/IMS~|~Items associated with Bridge Rehab on SFN 4903218 (MAD-71-4.708) 122274~|~1~|~1~|~01/BRF~|~rehabilitate bridge SFN 1432788 over Anderson Fork 107169~|~1~|~1~|~01/BRF~|~Plan Split 109384~|~1~|~2~|~02/NFA~|~Resurfacing and widening of Warrior Drive, WAS CR 804 0.00-1.10, from Drive 1 to Mary Avenue. Includes pavement markings, curb ramps, drainage and signing. Funded 100% Local. 109384~|~1~|~3~|~03/NFA~|~Construction of a proposed township road coming off of SR 339 just south of the existing school property. Work also includes the rehabilitation of three existing school drives with full depth pavement removal/replacement at the entrance of the drives. Funded 100% Local, Warren Schools. 109384~|~1~|~1~|~01/STR~|~Add turn lane for new school entrance at Warren Local location WAS SR 339 7.51-7.55. 108835~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT CR 231 0.62 (SFN: 0933597). 80694~|~1~|~1~|~01/IMS~|~This split is for capacity addition for Angola Rd Bridges (80/20).4807537 LUC IR475 5.47 Intersect: Cr 32 Angola Road 4807561 LUC IR475 5.47 Intersect: Cr 32 Angola Road 80694~|~1~|~5~|~05/IMS~|~This split is for rehab of bridge over Wolf Creek SFN 4807383 as requested bt Kathy Wald. (90/10) 80694~|~1~|~3~|~03/BRO~|~4807472 LUC IR475 5.22 Intersect: Norfolk Southern R.R. 4807502 LUC IR475 5.22 Intersect: Norfolk Southern R.R. 80694~|~1~|~4~|~04/IMS~|~4807383 Bridge over Wolf Creek. Adding Capacity (80/20) 80694~|~1~|~2~|~02/IMS~|~This split is for rehab of Angola Rd Bridges: 4807537 and 4807561. This is for Rehab (90/10). 99652~|~1~|~1~|~01/STR~|~Split for resurfacing work funded with 80% federal and 20% state 99652~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 88774~|~1~|~1~|~01/BRO~|~Replace entire bridge due to deteriorated substructure with minimal approach work on SFN 0600091 AUG 29 5658 over the East branch of Clear Creek 110712~|~1~|~1~|~01/IMS~|~Resurfacing. 110712~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 103414~|~1~|~1~|~01/NFP~|~Plan split 111633~|~1~|~1~|~01/NFP~|~Districtwide fence repairs and replacement. 115373~|~1~|~1~|~01/NFP~|~Split for the bridge work 121539~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 95428~|~1~|~1~|~01/NFA~|~Facilities money 4MA7 77628~|~1~|~7~|~07/IMS~|~This plan split includes all work associated with the constructing the Duke conduit on the Lincoln bridge over IR-71 (HAM-71-0367, SFN 3114392). 77628~|~1~|~6~|~06/S>2~|~This plan split includes all work associated with the traffic signal at Gilbert & Buena Vista, which shall be funded with 100% local dollars. 77628~|~1~|~4~|~04/S>2~|~This plan split represents all bridge work associated with the bridges not on the interstate. The only bridge in this plan split is the pedestrian bridge east of the IR-71 bridge over Victory, which is designated as Bridge No. HAM VCTRY 3691. 77628~|~1~|~2~|~02/IMS~|~This plan split represents all mainline, ramp, and interstate bridge work associated with the project. Bridges within the project limit are as follows: HAM-71-0320 McMillan over IR-71 (SFN 3114260), HAM-71-0322 NB IR-71 Entrance from McMillan (SFN 3114295), HAM-71-0322 William Howard Taft over IR-71 (SFN 3114325), HAM-71-0344 Oak over IR-71 (SFN 3114368), HAM-71-0367 Lincoln over IR-71 (SFN 3114392), HAM-71-0381 MLK over IR-71 (SFN 3114422), HAM-71-0392 Abandoned RR bridge over IR-71 to be removed (SFN 3114457), HAM-71-0396 New Bridge Stanton over IR-71 (SFN 3114465), HAM-71-0403 Fredonia over IR-71 to be removed (SFN 3114481), HAM-71-0427 Blair over IR-71 (SFN 3114538), HAM-71-0450 IR-71 over Victory (SFN 3114562). 77628~|~1~|~3~|~03/NHS~|~This plan split includes work on the following NHS routes: HAM-US-22 (Gilbert), HAM-US-42 (Reading), HAM-CR-605 (McMillan), HAM-CR-606 (William Howard Taft), and HAM CR-612 (MLK). Activities covered in this plan split include but is not limited to all earthwork, barrier, pavement, landscaping, curb, drainage, lighting, traffic surveillance, signs, pavement markings, Geotechnical work, retaining walls, MOT, Environmental, and incidental work associated with these locations. Traffic signals at MLK & Reading, MLK & Gilbert, MLK & Harvey/Vernon, Reading & University/Lincoln, Reading & Whittier, and Gilbert & Lincoln. Traffic signal interconnect is also included in this pay item. 77628~|~1~|~1~|~01/IMS~|~This plan split includes all work on interstate mainline and ramps. Mainline work extends from south of William Howard Taft to north of Victory. Existing ramps are Ramp F (NB IR-71 entrance from MLK) and Ramp TH (SB IR-71 exit to William Howard Taft). Proposed Ramps are Ramp A (NB IR-71 exit to MLK), Ramp B (NB IR-71 entrance from MLK), Ramp C (SB IR-71 exit to MLK), Ramp D (SB IR-71 entrance from MLK), and Ramp E (new portion of SB Exit to William Howard Taft). Activities covered in this plan split include but is not limited to all earthwork, barrier, pavement, landscaping, curb, drainage, lighting, traffic surveillance, signs, pavement markings, Geotechnical work, retaining walls, MOT, Environmental, and incidental work associated with these locations. This work also includes the MSD detention facility. Traffic signals at MLK & Ramps A/B, MLK & Ramps C/D, and McMillan & Ramp F. 77628~|~1~|~5~|~05/S>2~|~This plan split includes all work on non-NHS City roads, including but not limited to HAM-CR-663 (University/Lincoln), Whittier, Stanton leading up to the bridge, and the new connection between Van Buren and Borrman. Activities covered in this plan split include but is not limited to all earthwork, barrier, pavement, landscaping, curb, drainage, lighting, traffic surveillance, signs, pavement markings, Geotechnical work, retaining walls, MOT, Environmental, and incidental work associated with these locations. 77628~|~1~|~8~|~08/IMS~|~This plan split is for Bridge HAM-71-0381 (SFN 3114422) to rehabilitate Pier 5 using District Preservation funds. This split does not include widening or rehab work of this structure. 120692~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 104818~|~1~|~1~|~01/S<2~|~Construction Inspection 104818~|~1~|~2~|~02/S<2~|~Construction Inspection 104818~|~1~|~3~|~03/S<2~|~Construction Inspection 104818~|~1~|~4~|~04/S<2~|~Construction Inspection. 104818~|~1~|~5~|~05/S<2~|~Construction Inspection 112856~|~1~|~1~|~01/STR~|~FAY-22 from 10.98 to 17.62 112856~|~1~|~2~|~02/S<2~|~FAY-22 from 10.47 to 10.98 117894~|~1~|~1~|~01/SAF~|~HOC SR 664 15.151 Safety 121831~|~1~|~1~|~01/MPO~|~installation of one EV charging station in Mt. Washington Neighborhood business district 104929~|~1~|~1~|~01/NFA~|~Wood County truck replacement project 98301~|~1~|~1~|~01/NFP~|~Guardrail repair on various routes 124331~|~1~|~1~|~01/ENH~|~Sidewalk project 93866~|~1~|~1~|~01/BRO~|~Project will replace the 1950 cast-in-place reinforced concrete beam bridge deck (middle portion). SFN 3136221. 1965 widened deck will remain in place as existing. Project includes repairs to substructure including concrete abutments. All work to take place within existing right of way. Structure carries Galbraith Road (CR-101) over the West Fork of Mill Creek. 96380~|~1~|~1~|~01/IMS~|~test 96380~|~1~|~2~|~02/MPO~|~test 107818~|~1~|~1~|~01/STR~|~MAR-47-2.09 to 2.45 MAR-203-0.43 to 1.19 MAR-257-0.35 to 0.65 107818~|~1~|~2~|~02/STR~|~Bridges on MAR-47-2.09 to 2.95. SFNs: 5102278 124675~|~1~|~1~|~01/SAF~|~80% CEAO, 20% local for roundabout construction only 91653~|~1~|~1~|~01/NHS~|~Consultant CE contracts 119643~|~1~|~1~|~01/NHS~|~Roadway reconstruction work along US 30. 110935~|~1~|~1~|~01/S>2~|~Resurfacing work on the Urban STP system SLM 5.10 to 5.82 (SCL to Pleasant Valley) 110935~|~1~|~2~|~02/NHS~|~Resurfacing work on the NHS system, SLM 5.82 to 7.86 (Pleasant Valley to Ridgewood) 110935~|~1~|~3~|~03/NFP~|~Plan split for non-eligible work items. 97836~|~1~|~4~|~04/BRF~|~Replace 1239503 CLA 350-0459 Moorefield Road over Buck Creek 97836~|~1~|~2~|~02/BRF~|~Replace SFN 5769019 MOT 43-0080 Old Mill Road over Pigeye Creek 97836~|~1~|~1~|~01/BRF~|~Replace SFN 5531179 MIA CR 21-0632 N Casstown/Sidney Rd over Lost Creek 97836~|~1~|~3~|~03/NFA~|~Reaplce SFN 5767644 MOT MO 163-105 S. Gebhart Road over Sycamore Creek 110864~|~1~|~1~|~01/SAF~|~District 5 Safety Funds - 4HJ7 (90% Federal) / 4BC7 (20% State) - See CAP Comment - Project to replace Type A end treatments along NHS routes in municipalities in Licking and Knox Counties. 101024~|~1~|~1~|~01/SAF~|~District Wide project for various striping and RPM work. Actual locations to be determined. 95631~|~1~|~1~|~01/ENH~|~Enhance the transit, pedestrian and bicycle facilities along Cedar Glen Parkway - Cedar Road in Cleveland Heights using 80% federal (MPO Enhancement) with 20% local matching funds. 113727~|~1~|~1~|~01/SAF~|~Construct sidewalks from Powell to Highland in Columbus. 113044~|~1~|~1~|~01/STR~|~All work in this split. 88621~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete AUG-SR-197 7.440 to 16.030 88621~|~1~|~2~|~02/NFA~|~Resurface the existing roadway with asphalt concrete AUG-SR-116 7.240 to 11.080 112679~|~1~|~1~|~01/IMS~|~Epoxy overlay of FRA-70 over Nelson Ave. & NS RR. 102050~|~1~|~1~|~01/IMS~|~Work on three structures within existing deck width 102050~|~1~|~2~|~02/NHS~|~Work on widened section of three structures 102050~|~1~|~3~|~03/BRO~|~Work within existing bridge width. Eligible for BR funding at 90/10 102050~|~1~|~4~|~04/BRO~|~Work to widen structure. Eligible for BR funding at 80/20 123785~|~1~|~1~|~01/IMS~|~Plan Split for interstate resurfacing at 90/10 121273~|~1~|~1~|~01/STR~|~All Work Within this Split 83624~|~1~|~1~|~01/S>2~|~80/20 funding split for federal STP funds. 123722~|~1~|~1~|~01/IMS~|~Replace culvert type bridge carrying Aults Run under IR 70 via tunnel liner plate. 111030~|~1~|~1~|~01/SAF~|~Repair landslide along Columbia Pkwy. 124723~|~1~|~1~|~01/ENH~|~Shared use path utilizing 100% Federal funds (TAP and Safety) up to Federal maximum. 116624~|~1~|~1~|~01/NFA~|~Lighting Project. 114395~|~1~|~1~|~01/S>2~|~Plan Split 01/S>2/PV/ " - 80% Federal 20% State 114395~|~1~|~2~|~02/S>2/PICK~|~Plan Split 02/S>2/PV/PICK 114395~|~1~|~3~|~03/STR~|~Plan Split 03/STR/PV/ 121104~|~1~|~1~|~01/BRF~|~Primary plan split for Bridge Exchange funds 87690~|~1~|~1~|~01/NHS~|~RIC SR 13 - 11.01 to 14.40 Asphalt Concrete Repairs Full and Partial Depth. 97497~|~1~|~1~|~01/BRF~|~100% Federal participation on the bridge replacement ofr SFNs 1868292 and 1867857 using OBP funds. 90878~|~1~|~1~|~01/STR~|~Bridge Replacement (< 20' length): CRA-294-4.10 (SFN 1703579) 104261~|~1~|~1~|~01/NFP~|~MOWING 115130~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of SR 61 and SR 229 including the necessary bridge and culvert modifications 110866~|~1~|~1~|~01/SAF~|~Added Safety Plan split 101278~|~1~|~2~|~02/NFP~|~SEN-635 101278~|~1~|~1~|~01/STR~|~WIL-34, WOO-199, WOO-235 87191~|~1~|~1~|~01/STR~|~Work on SR 15 in Defiance County outside the Defiance Urban Area, which is SR 15 from 0.00 to 13.07 and 21.65 to 22.33. Also includes all work on SR 111 and 637 in Paulding County that is part of this project. 87191~|~1~|~2~|~02/S<2~|~This split is for work inside of the Defaince Urban Area which is SR 15 from 13.07 to 13.35. Although, inside the Defaince Urban area, the work is outside of the City of Defiance. Therefore, there are no local funds in this event. All funds are from the District Preservation Program budget. 121668~|~1~|~1~|~01/STR~|~Replace deck and repair scour. 98999~|~1~|~1~|~01/S>2~|~Kilburn 98999~|~1~|~2~|~02/NFP~|~100 County funds 105658~|~1~|~1~|~01/S>2~|~Plan Split for Winchester Pike over US 33 in Columbus 93735~|~1~|~1~|~01/SAF~|~Installing pedestrian signal heads, pedestal poles, conduit, wire, and pull boxes at four intersections within the Village of Versailles. Pavement, sidewalk, curb ramp, and pavement marking restoration will be included. Locations are from the End radius on all 4 corners of each of four intersections: Main and West, Main & Center, Center & Wood, and Center & Ward. 114509~|~1~|~1~|~01/S>2~|~plan split for resurfacing the large urban sections on BUT SR 747 98257~|~1~|~1~|~01/NFP~|~WIL-SR49-15.00 110720~|~1~|~1~|~01/IMS~|~Using district preservation allocations. 118520~|~1~|~1~|~01/BRO~|~The project length is approximately 800?, from the end of the 2017 Stimson roundabout project (PID 103157) to CR 25 (Rock Riffle Road). To extend the life of the bridge and defer a complete structure replacement for decades. 100833~|~1~|~2~|~02/S>2~|~Rehab HAM-50-2138R bridge (SFN 3103307) that carries a ramp from 2nd street to US 50 over Broadway by filling voids in Post-tensioned bridges with grout. 100833~|~1~|~1~|~01/IMS~|~Rehab bridges by grouting the voids found in the tendon cavities for the bridges carrying the interstate or ramps to the interstate. 88310~|~1~|~1~|~01/IMS~|~Reconst no added capacity - pvmt workAlso retaining walls 1, 2A, 2B, 2C, 3, 4, 5 88310~|~1~|~2~|~02/IMS~|~Construct 6 new bridges and retaining wall 6SFN 2510316 FRA-270-17.16 B1 - Ramp WN over 270SFN 2501155 FRA-33-2.71L B3 L - 33 WB over new ramps WN & ESSFN 2501163 FRA-33-2.71R B3 R - 33 EB over new ramps WN & ESSFN 2510308 FRA-270-17.14 B5 - Ramp ES over 270SFN 2510340 FRA-270-17.61 B6 - Ramp NW1 over S Fork Indian RunSFN 2510405 FRA-270-17.63 B7- Ramp EN over S Fork Indian Run 88310~|~1~|~6~|~06/IMS~|~Charges to ATT&T for delays 88310~|~1~|~7~|~07/IMS~|~Repair of damaged attentuators 88310~|~1~|~8~|~08/IMS~|~Repair due to fire on bridge 88310~|~1~|~9~|~09/NHS~|~Installation of fiber optic cable 88310~|~1~|~3~|~03/IMS~|~Bridge Rehab no added capacity:SFN 2501112, FRA-33-2.57 L - 33 WB over 270SFN 2501147, FRA-33-2.57 R- 33 EB over 270SFN 2510294, FRA-270-16.73 270 SB over Cosgray DitchSFN 2510200, FRA-270-16.19L 270 SB over Cramer DitchSFN 2510413, FRA-270-18.23L 270 SB over N Fork Indian Run 88310~|~1~|~4~|~04/IMS~|~Project eligible utility items - water and sanitary 88310~|~1~|~5~|~05/IMS/DUB~|~100% funded Dublin items:Paint guardrail in 33 median W of Post/Franz, paint overhead sign supportsLandscaping-seeding, perennials, trees, concrete grid between grassesfree standing limestone aesthetic walls, irrigation 105488~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 84020~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 84020~|~1~|~2~|~02/NFP~|~Split for 100% state items 104745~|~1~|~1~|~01/IMS~|~plan split 102061~|~1~|~1~|~01/SAF~|~This plan split if for signal upgrades at 51 locations in Hamilton County. 98696~|~1~|~1~|~01/STR~|~Whitetopping HAS-151 with 4.5" bonded concrete overlay. 124422~|~1~|~1~|~01/NHS~|~Athens US 50-6.11R Bridge Replacement (SFN:0501476) 120250~|~1~|~1~|~01/SAF~|~Roundabout and pedestrian improvements on Roberts Rd at Frazell and Spindler 110516~|~1~|~1~|~01/BRO~|~Bridge funds Plan split 122959~|~1~|~1~|~01/SAF~|~SAFETY 114145~|~1~|~1~|~01/NFP~|~Dead ash tree removal on various routes in D9. 114201~|~1~|~1~|~01/NFA~|~Replace deficient bridge and increase vertical clearance over CSX railroad. The proposed bridge will be a 3-span prestressed concrete, adjacent box beam superstructure on reinforced concrete wall-type abutments and piers. Project to include necessary approach and intersection work to accommodate the increase in vertical profile for the clearance requirements over the CSX RR. 101530~|~1~|~1~|~01/NFP~|~Two year construction inspection agreement. 110633~|~1~|~2~|~02/IMS~|~All work related to the Ohio bridge size culvert HAM-275-0158 (which is less than 20 feet and therefore not a federal size bridge). 110633~|~1~|~1~|~01/S>2~|~Rehab bridge size HAM-50 culvert by paving the invert with concrete. Line the adjacent small culvert with a CIPP liner 110633~|~1~|~3~|~03/IMS~|~Work associated with Bridge Size culvert HAM-75-1710 repair 124692~|~1~|~1~|~01/BRO~|~Bridge deck replacement. 93485~|~1~|~2~|~02/S>2~|~Bridge brackets for holding Dominion East Ohio Gas Line. 93485~|~1~|~1~|~01/BRO~|~Deck replacement of the linked structure > 20' span. 93485~|~2~|~3~|~03/S>2~|~Resurfacing TRU SR 534 from4.02 to 5.23 some within the Village of Newton Falls. 121343~|~1~|~1~|~01/NFA~|~TSMO 112589~|~1~|~1~|~01/IMS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work. 92161~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for guardrail ding and dent repairs for one year. 100796~|~1~|~1~|~01/NFP~|~Emergency repair of damage due to truck accident and fire 116167~|~1~|~1~|~01/SAF~|~Pavement marking project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%. 96029~|~1~|~2~|~02/IMS~|~New bridge for ramp SW 96029~|~1~|~1~|~01/IMS~|~Roadway work 120385~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 90903~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 84681~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District budget SAC 4MP7. 117167~|~1~|~1~|~01/IMS~|~This plan split includes all anticipated work at this time. The splits will need to be updated before scoping. 103643~|~1~|~1~|~01/S<2~|~DSR BEL-016 103643~|~2~|~2~|~02/S<2~|~DSR BEL-017 103643~|~3~|~3~|~03/S<2~|~DSR BEL-018 103643~|~4~|~4~|~04/S<2~|~DSR BEL-018, ER Event OH18-01 95668~|~1~|~1~|~01/CMQ~|~Improve intersection of Coy/Dustin. 94170~|~1~|~1~|~01/BRO~|~Replace existing deck with new composite reinforced concrete deck for bridge BEL-7-2361 (SFN 0700770). New aproach slabs will be provided. The substructure units will be repaired as needed. 103819~|~1~|~1~|~01/STR~|~Bridge repair on rural route. 103819~|~1~|~2~|~02/NFA~|~Bridge repair on non-Federal route. 92166~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance Funds for one year Gaurdrail Ding and Dent Repairs contract 99611~|~1~|~1~|~01/BRO~|~Replace existing bridge COL 164 0980 (SFN 1503979) with new structure 124355~|~1~|~1~|~01/SAE~|~Roundabout 103977~|~1~|~1~|~01/STR~|~HIG 72 2.30 (SFN 3601455) bridge replacement. 93439~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Tallmadge Avenue from Home Avenue to Brittain Road, in the City of Akron. 102401~|~1~|~1~|~01/STR~|~SR 9, 2.55 to 12.12 102401~|~1~|~2~|~02/S<2~|~SR 9, 12.12 to 12.28 102401~|~1~|~3~|~03/NHS~|~SR 9 12.28 to 13.06 114369~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " 118273~|~1~|~1~|~01/SAF~|~Safety plan split for signal installation and left turn lane realignments 120096~|~1~|~1~|~01/SAF~|~Plan split for roundabout construction 117949~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order. 120302~|~1~|~1~|~01/NHS~|~Clean and paint structural steel of bridge carrying US 22 over South Fork. 87710~|~1~|~1~|~01/NHS~|~District Allocation 99052~|~1~|~1~|~01/NHS~|~Split for pavement work on SR-8 89397~|~1~|~1~|~01/ENH~|~This split is for work eligible for funding with Transportation Enhancement (TE) funds. The federal funds are from the ODOT Central Office controlled TE program. 89397~|~1~|~2~|~02/NFP~|~This split is for 100% city funded signal work that is not eligible for Transportation Enhancement (TE) funds. 86206~|~1~|~1~|~01/BRO~|~Replace box structure over Miller DitchSFN 2516446, FRA-317-11.90, Miller Ditch01/BRO/BR/ 105020~|~1~|~1~|~01/STR~|~Plan split 109011~|~1~|~1~|~01/STR~|~Culvert replacement at CAR-542-4.21 and 4.27. 109011~|~1~|~2~|~02/STR~|~Sanitary sewer replacement 108087~|~1~|~1~|~01/STR~|~Plan split for construction engineering services. 108087~|~1~|~2~|~02/STR~|~Plan split for construction engineering services. 105454~|~1~|~1~|~01/STR~|~LOR SR 0082 5.13-10.06 121330~|~1~|~2~|~02/NHS~|~FRA US 33 and FRA SR 161 121330~|~1~|~1~|~01/IMS~|~FRA IR 270 and FRA IR 670 109489~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 106704~|~1~|~1~|~01/BRF~|~Work to replace the bridge. Federal funds from CEAO budget with local funds from Hardin County. 108103~|~1~|~1~|~01/S>2~|~Split for SR-87 paving 108552~|~1~|~1~|~01/STR~|~ER Event OH18-01. Landslide repair project. MOE 536 8.90-8.94. DSR MOE-023. Funded 100% federal. 104495~|~1~|~1~|~01/NFA~|~TR-3 98304~|~1~|~1~|~01/SAF~|~Modify the existing roadway geometry and traffic signal at the intersection of US 62 & Glen Drive in the Village of Millersburg. 95550~|~1~|~1~|~01/STR~|~HIG 28 (7.27-15.35) Microsurface 95550~|~1~|~2~|~02/S<2~|~HIG 28 (15.35-15.43) MicrosurfaceHIG 41 (8.94-9.63) Double Microsurface 103914~|~1~|~1~|~01/NFP~|~Upgrade traffic signals at various locations 98530~|~1~|~1~|~01/NFP~|~Pavement markings work funded with 100% state funds from the District Preservation Program budget. 105099~|~1~|~1~|~01/STR~|~BRO 505 5.50 culvert replacement. 107847~|~1~|~1~|~01/STR~|~District preservation funds. 99236~|~1~|~1~|~01/SAE~|~Various County Roads. 90947~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an asphalt inlay. HOC 33 9.48-14.69. 80/20% Federal/State. 90947~|~1~|~2~|~02/STR~|~Four-lane resurfacing project using an asphalt inlay. HOC 328 11.26-11.41 ramps. 80/20% Federal/State. 82470~|~1~|~3~|~03/STR~|~Deck overlay with joint repair/replacement on SFNs 5503817-MIA-201-04.90, 5503841-MIA-201-06.11, 5503876-MIA-201-08.53 82470~|~1~|~1~|~01/STR~|~Resurface existing roadway with asphalt concrete (2 lane resurfacing) on MIA US 40 SLM 2.01 to 6.30 (Segment length 4.30) and MIA SR 201 SLM 4.30 to 9.31 (Segment Length 5.01 ) 82470~|~1~|~2~|~02/S>2~|~Resurface existing roadway with asphalt concrete on MIA US 40 from SLM 0.00 to 2.00 segment length 2.00. 108098~|~1~|~1~|~01/MPO~|~Resurfacing Chestnut Blvd in the City of Cuyahoga Falls. 104996~|~1~|~1~|~01/NFP~|~Restriping within District 5 (MUS, GUE, COS) 102773~|~1~|~1~|~01/NHS~|~All work is in this split. Funding is 80% federal; and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7. 102773~|~1~|~2~|~02/NHS~|~Collision repair work on bridge hit on Krouse Road over US 24. 121444~|~1~|~1~|~01/NHS~|~Plan split for FUL-108 108061~|~1~|~1~|~01/STR~|~All items associated with crack sealing on I-270. 115338~|~1~|~1~|~01/MPO/RICH~|~Resurfacing. 82573~|~1~|~1~|~01/CMQ~|~100% CMAQ signal work, Phase D. Coaxial to fiberopticLocal Sponsor-Columbus 82573~|~1~|~2~|~02/CMQ/COL~|~100% Local funding - Costs to upsize fiber strand count during construction for Columbus Department of Technology. 101097~|~1~|~1~|~01/SAF~|~Add turn lanes at US 33/Fishinger Rd 101097~|~1~|~2~|~02/SAF~|~Replacement of the traffic signal only at intersection of Fishinger Rd and Nottingham Rd. Pedestrian facilities not under this split 101097~|~1~|~3~|~03/NHS~|~Paving and guardrail work 102414~|~1~|~1~|~01/NHS~|~STA SR 21 from 17.33 to 21.44. 118746~|~1~|~1~|~01/SAF~|~All work is included in this split. 101178~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route 101178~|~1~|~2~|~02/S<2~|~AC overlay without repairs on small urban route 101178~|~1~|~3~|~03/NHS~|~Remove asphalt, patch, waterproof, and pave 123499~|~1~|~1~|~01/STR~|~Chip Seal Project 107829~|~1~|~1~|~01/STR~|~Resurfacing from the Allen County line to the Findlay Urban Area boundary at CR 9 at 12.06. 107829~|~1~|~2~|~02/S<2~|~Resurfacing from the Findlay Urban Area boundary at CR 9 at 12.06 to the end of the project at 13.29. 122381~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over Branch of Lake Fork 115925~|~1~|~1~|~01/NHS~|~Resurfacing WAY US 30 05.30 to 11.62 AC Overlay W/Rpr 115925~|~1~|~2~|~02/BRO~|~Bridgw Work to be Determined at a later Date. 107714~|~1~|~1~|~01/IMS~|~Pavement Replacement 107714~|~1~|~2~|~02/IMS~|~Resurfacing for LOR-90-13.17 to 13.57 107714~|~1~|~3~|~03/IMS~|~Deck Replacements on LOR IR 0090 11.53 L&R 107714~|~1~|~5~|~05/IMS~|~Added capacity portion of pavement replacement. 107714~|~1~|~6~|~06/S5K~|~Full depth pavement replacement. 107714~|~1~|~4~|~04/SAE~|~Purchase and install digital message signs (DMS) on IR 90 to improve driver information. LOR-90, slm 12.5 to 13.0 Eastbound, 13.4 to 13.9 Westbound,15.8 to 16.4 Westbound. 98933~|~1~|~1~|~01/IMS~|~District Wide Pavement Markings 93270~|~1~|~1~|~01/STR~|~General system paving of MAR-203: 0-7.74 96199~|~1~|~1~|~01/NFP~|~Facilities Funding - ReRoof District HQ 87194~|~1~|~2~|~02/S<2~|~This split is for work on SR 37 that is inside the Findlay Urban Area although outside the City of Findlay. It is for the work from the beginning of the project at 2.57 to the Findlay Urban Area boundary at CR 180 which is at 3.19. All funds are from the District Preservation Program budget. 80% 4PF7 and 20% 4PS7. There are no local funds in this split. 87194~|~1~|~3~|~03/NFA~|~All work on SR 698 from the south corporation limits to the north corporation limits of the Village of Jenera 0.25 to 0.77. All funds are from the District Preservation Program budget. 100% state funds SAC 4PS7. There are no local funds in this split. The work in this split is on a rural minor collector and is not eligible for federal aid. 87194~|~1~|~1~|~01/STR~|~All work on SR 37 outside the Findlay Urban Area. On SR 37 in Hancock County from the Findlay Urban Area boundary at CR 180 which is at 3.19 to the end of the work at 6.32. All work on SR 103 from SR 698 to the east corporation limits of the Village of Arlington. All funds are from the District Preservation Program budget. SACs 4PF7 and 4PS7. There are no local funds. 94280~|~1~|~2~|~02/NFP~|~Highland Project Management fees 94280~|~1~|~1~|~01/NFP~|~100% StateIn Fiscal year it is proposed to construct a new highway garage. 92635~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete on MOT SR 235 1.92 from SLM 1.92 at IR 70 to the MOT/CLA County Line (SLM 2.52) 107819~|~1~|~2~|~02/STR~|~MAR-203-3.24 to 7.74 107819~|~1~|~1~|~01/NHS~|~MAR-23-2.44 to 7.61 104602~|~1~|~1~|~01/MPO~|~Rehab of Idora Bridge in Mill Creek Park. 97691~|~1~|~1~|~01/NFP~|~"01/NFP/OT" - Construction of new county garage facility at location of current county garage. 96975~|~1~|~1~|~01/IMS~|~Replacing raised pavement markings on various routes throughout District 4. 101822~|~1~|~1~|~01/NHS~|~Replace existing structure (HAS_22-0264, SFN 3400573) on US 22 with new structure. 93948~|~1~|~1~|~01/NFP~|~This is the district's FY 16 district wide lighting maintenance construction contract using 4CP7 sac. 104767~|~1~|~1~|~01/NFP~|~Districtwide RPM Replacement. 121189~|~1~|~1~|~01/STR~|~Upgrade Highway Lighting 93714~|~1~|~1~|~01/STR~|~01/STR/BR/ ; WYA-103-0510, SFN 8802548; 100% State funds - 4PS7 - No Cap 93714~|~1~|~2~|~02/BRF~|~02/BRF/BR/ ; WYA-293-0476, SFN 8803781; 80% Fed (4PF7) - 20% State (4PS7) - No Cap 117005~|~1~|~1~|~01/STR~|~Resurfacing. 117005~|~1~|~2~|~02/STR~|~Minor bridge work. 117005~|~1~|~3~|~03/STR~|~Minor bridge work, 10' to 20' structure. 83571~|~1~|~3~|~03/S>2~|~Demolition of the Goodyear building at construction site acrossed from Mall Drive 6. 83571~|~1~|~1~|~01/S>2~|~Reconfigure SR 741 from SLM 3.15 to 3.62, remove traffic signal at SR 741 and Mall Drive 5/Prestige Plaza, upgrade traffic signal at SR 741 & Mall Drive 6 in Miami Township. 83571~|~1~|~2~|~02/S>2~|~Reconfigure SR 741 from SLM 3.15 to 3.62, remove traffic signal at SR 741 and Mall Drive 5/Prestige Plaza, upgrade traffic signal at SR 741 & Mall Drive 6 in Miami Township. This split covers district's allocation to cover the overage of the Safety project cap. 98288~|~1~|~1~|~01/IMS~|~Rehabilitation of GUE-70-1.26 L and R structures 120768~|~1~|~1~|~01/ERD/UOFA~|~Center for Rehabilitation of Aging Transportation Infrastructure. 117677~|~1~|~1~|~01/SAF~|~Plan split for all roadway work on SR-2 117677~|~1~|~3~|~03/BRO~|~Plan split for new bridge 117677~|~1~|~2~|~02/BRO~|~Plan split for all work on existing LUC-2-1026 structure 115787~|~1~|~1~|~01/SAF/CCEO~|~Reconstruct approximately 4600? of CR 7, improving horizontal and vertical curves as well as widening the pavement and berms and removing fixed objects from the clear zone. 114032~|~1~|~1~|~01/ENH~|~Construction of new pedestrian bridge over Sandy Creek in the Village of Minerva. 100925~|~1~|~1~|~01/S>2~|~Widening of the south side of Indian Ripple Road from Darst Road to Marydale Drive to extend the second eastbound through lane. Installation of curb and gutter and storm sewer system, lighting, and a 5' wide sidewalk along the south side of the roadway. Access management improvements will also be made by the City east of Darst Road. 97759~|~1~|~1~|~01/NFA~|~Auglaize County Garage Wash Bay installation 112247~|~1~|~1~|~01/STR~|~General plan split. Will be more specific when locations are determined. 94522~|~1~|~1~|~01/BRF~|~Reconstruct Bridge No. BUT-CLEVL-0088 (SFN: 0960144) over Two Mile Creek with a 60 to 70 foot single-span structure composed of concrete box beams with a composite deck and sidewalks on both sides 97492~|~1~|~1~|~01/NHS~|~Replace backwalls and associated work to facilitate the construction of same for structures COL-30-3413 L (1502379), COL-30-3413 R (1502328), & COL-30-3413 CD (1502298). 97492~|~2~|~2~|~02/NHS~|~Replace backwalls and associated work to facilitate construction of same on structure COL-7-0594 L (SFN 1504800). 93087~|~1~|~4~|~04/S<2~|~Signal maintenance/upgrade project. Replacement of pull boxes, detectors, misc signal hardware. Federal 80%/State 20%. 93087~|~1~|~1~|~01/SAF~|~Signal maintenance/upgrade. 100% safety funds for safety items such as the battery backups, backplates/heads, and LEDs. 93087~|~1~|~3~|~03/STR~|~Signal maintenance/upgrade project. Replacement of pull boxes, detectors, misc signal hardware. Federal 80%/State 20%. 93087~|~1~|~2~|~02/NHS~|~Signal maintenance/upgrade project. Replacement of pull boxes, detectors, misc signal hardware. Federal 80%/State 20%. 108736~|~1~|~2~|~02/S<2~|~mill & fill on SR 598 within the corp limits 108736~|~1~|~3~|~03/S<2~|~mill & fill on SR 598 outside of the city corp limits 108736~|~1~|~4~|~04/S<2~|~mill & fill pavement repairs on SR 598 within the city corp limits - 100% local funding 108736~|~1~|~1~|~01/SAF~|~Project work using Safety and Small City funding excluding urban paving funds 108736~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 96779~|~1~|~1~|~01/STR/PIK~|~It is proposed to replace the Sheets Road Bridge (SFN 6633110)on TR 254 (SLM 0.14). 97323~|~1~|~2~|~02/NHS~|~Culvert replacement project. ATH 13 3.88 (CFN 050130028 )and ATH 550 0.96 (CFN 055500025). NHS route funded 80 federal/20 state. 97323~|~1~|~3~|~03/NFA~|~Culvert replacement project. ATH 690 4.09 (CFN 056900409). Not on any federal aid system. Funded 100% state. 97323~|~1~|~1~|~01/STR~|~Culvert replacement project. ATH 13 0.62 (CFN 050130006), ATH 56 4.16 (CFN 050560260), ATH 329 14.09 (CFN 053290700), ATH 550 12.28 (CFN 055500510), ATH 681 4.32 (CFN 056810245), VIN 50 23.08 (CFN 820500149), VIN 50 25.14 (CFN 820502514), VIN 50 25.22 (CFN 820502522), VIN 50 25.46, VIN 56 0.12 (CFN 820560002), VIN 56 0.25 (CFN 820560003), VIN 56 3.33 (CFN 820560016), VIN 93 11.93 (CFN 820930071). Rural other federal aid funded 80 federal/20 state. 83953~|~1~|~1~|~01/STR~|~Replace bridgeSFN 2103729, DEL-605-1.93, over Duncan Ran01/STR/BR 105272~|~1~|~1~|~01/STR~|~Resurfacing BEL-147 123322~|~1~|~1~|~01/IMS~|~Plans Split for work associated with conduit repair 107841~|~1~|~1~|~01/IMS~|~OH18-01 ER Event. Landslide repair. WAS 77 6.07 N. Funded 100% federal. 97431~|~1~|~1~|~01/S>2~|~Local intersection reconstruction. 102803~|~1~|~1~|~01/S>2~|~Work eligible for GSM funding to construct a retaining wall on the south side of Lorain Road just east of West 192nd Street. 117947~|~1~|~1~|~01/S>2~|~North Knot proposed design on Lane Avenue. 117947~|~1~|~2~|~02/S>2~|~North Knot construction engineering for Lane Avenue. 117947~|~1~|~3~|~03/S>2~|~North Knot CE for Lane Avenue 101832~|~1~|~1~|~01/STR~|~Loop Detector Repair 102262~|~1~|~1~|~01/NHS~|~This plan split is for NHS routes. 94046~|~1~|~1~|~01/IMS~|~Guardrail job order contract using 4CP7 funds. 94046~|~1~|~3~|~03/NFA~|~Fence replacement at two ODOT maintenance yards using LBM7 funds. 94046~|~1~|~2~|~02/IMS~|~90/10 fed/state/ plan split for systemmatic replacement of guardrail. 121112~|~1~|~1~|~01/STR~|~Plan split for culvert replacement at OTT-590-3.52 96093~|~1~|~2~|~02/STR~|~100% Local Richwood items 96093~|~1~|~1~|~01/STR~|~STP Rural Pavement 80/20 113285~|~1~|~1~|~01/S<2~|~Field Pave/Culvert Repairs at RIC US 0042 06.01 & 06.02 88809~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 96886~|~1~|~1~|~01/BRF~|~Bridge replacement 116631~|~1~|~1~|~01/IMS~|~Delaminated Sign Replacement Overage 113161~|~1~|~1~|~01/CMQ~|~Intersection improvement at Highland Rd and Valley View Rd. 111674~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2025. Various routes and sections. Funded 100% State. 92549~|~1~|~1~|~01/NFA~|~Constructing a new pedestrian,bicycle and handicapped route downtown to the North side of the Village of New Bremen. S terminus is the existing trailhead to Minster at restored Lock 1 & Lockkeeper's House;N Terminus is Lock 2 Rd, NCL 114446~|~1~|~1~|~01/NFP~|~All work in this project. 94741~|~1~|~1~|~01/SAF~|~CO Safety will participate in up to $8m for this project. This work will consist of widening northbound IR-71 from the existing northbound exit to Ridge Road to the northbound exit from IR-71 to Red Bank Road. As part of this widening, the northbound entrance ramp from Kennedy will be reconstructed to pass between the pier and abutment of the Kennedy overpass over IR-71. A large retaining wall is anticipated as part of this work along northbound IR-71 from north of Kennedy to the exit ramp to Red Bank. 94741~|~1~|~2~|~02/SAF~|~This work consists of $3m of unfunded work. This work will likely consist of removing the northbound IR-71 exit ramp to Ridge North and making improvements to Ridge Road. 94741~|~1~|~3~|~03/IMS~|~Use of capital budget to complete construction funding estimate. 111627~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items using 4TA7 (NOACA) 120981~|~1~|~1~|~01/S>2~|~Construct new sidewalk. 121941~|~1~|~1~|~01/MPO~|~Plan split for the addition of bike lanes within roadway, upgraded pedestrian crossings, and TLCI implementation work items. 121941~|~1~|~2~|~02/NFP~|~Plan split for non-eligible items at 100% local cost. 102627~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Resurfacing with related work on FAI-SR 256-05.99 to 14.12 102627~|~1~|~2~|~02/SAF~|~Safety Recessed-Wet Reflective Funding - 4BC7 (100% State) - See CAP Comment - Safety Funding for the application of Recessed-Wet Reflective process on Longitudinal Striping. 124125~|~1~|~1~|~01/S5K~|~Resurfacing and related work. 124125~|~1~|~2~|~02/S5K/ZANE~|~Resurfacing and related work. 84657~|~1~|~1~|~01/IMS~|~Construction of two noise walls along IR-480, in the City of Twinsburg, Summit County, Ohio. Construction of NSA#4 near the Chamberlain Trail/Mortus Drive/Greenway Drive/Concord Circle/Gettysburg Drive residential neighborhood. Construction of NSA#6 in the Birchwood Park/White Oak Drive residential neighborhood. 112647~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district. 117424~|~1~|~1~|~01/NFA~|~Bridge rehabilitation CEAO funded (BFP) 114207~|~1~|~1~|~01/NFP~|~Created for J&C involvement 111604~|~1~|~1~|~01/MPO~|~For federally eligible items in Construction and CE from SAC 4TA7 (NOACA) 100497~|~1~|~1~|~01/STR~|~ADA 125 (10.18-14.71) 102770~|~1~|~1~|~01/NHS~|~Bridge Replacement: WAY-250-19.26 (SFN 8504830) 107388~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement for FY2023. 107388~|~1~|~2~|~02/STR~|~Extrusheet sign replacement for FY2023. 107388~|~1~|~3~|~03/S5K~|~Extrusheet sign replacement for FY2023. 109876~|~1~|~1~|~01/STR~|~Bridge Repair 101403~|~1~|~2~|~02/NHS~|~Settlement repair near SLM 5.0 101403~|~1~|~1~|~01/NHS~|~Resurfacing on BUT-4 By-pass 94796~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 0.531 to SLM 1.594. 115313~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing. 115511~|~1~|~1~|~01/NFP~|~Created for J&C involvement 98628~|~1~|~1~|~01/BRF~|~OBPP SFN 5234026 bridge replacement using Design/Build 105531~|~1~|~3~|~03/SAF~|~Plan split for rumble stripes from SLM 9.25 - 11.48 105531~|~1~|~1~|~01/NHS~|~WOO SR 795 between SLM 2.35 to 9.249 105531~|~1~|~2~|~02/S>2~|~WOO SR 795 SLM 9.249 to 11.484 and OTT SR 795 from 0.00 to 0.718 105531~|~1~|~4~|~04/SAF~|~Plan split for traffic signal work at Oregon Rd. 103689~|~1~|~1~|~01/SAF~|~Work necessary to construct a roundabout. Federal funds from the state safety program and the Small City Program with the match provided by the City of Defiance. All funds over the capped amount will be provided by the City of Defiance. Funding priority is Small City Program, Safety Program and then 100% city if any. 103689~|~1~|~3~|~03/NFP~|~Waterline costs to be paid 100% by the City of Defiance. 103689~|~1~|~4~|~04/S<2~|~SR 15 resurfacing. 80% Federal funds from the District Preservation Program Budget with the 20% match provided by the City of Defiance. 103689~|~1~|~5~|~05/ENH~|~Bike and pedestrian items at the intersection portion of the project. The work will be paid with funds from the Transportation Alternatives Program (TAP) up to the cap and then Small City and Safety would be used if available until their caps are reached. After all federal funds caps are used, any needed funds will be provided by the City of Defiance. 103689~|~1~|~2~|~02/ENH~|~Work to construct a Multi-Use Path. This is for costs outside of the intersection area. Costs inside the intersection area where a roundabout will be constructed are in Plan Slit 5. 95% federal funds using Toll Revenue Credit (TRC) from the Transportation Alternatives Program (TAP). The local match and any funds needed over the TAP cap will be provided by the City of Defiance. 111568~|~1~|~1~|~01/SAF~|~Federally eligible items. 111568~|~1~|~2~|~02/S<2~|~Federally ineligible items. 111568~|~1~|~3~|~03/MPO~|~Federally ineligible items. 119254~|~1~|~1~|~01/STR~|~Highway Lighting 111607~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - 80% Federal (4SF7) and 20% State (4SS7) - slide repair by removal of excess pavement and installation of geogrid and/or light weight material. 119382~|~1~|~2~|~02/S>2~|~Culvert other. 119382~|~1~|~1~|~01/IMS~|~Lining culverts. 119382~|~1~|~3~|~03/STR~|~Culvert other. 91493~|~1~|~1~|~01/SAE~|~Widen SR-747 to provide a 450' NB right turn lane, restripe Union Centre Boulevard to provide a 550' EB right turn lane, and replace the traffic signal at SR-747 & Union Centre Boulevard while providing right turn overlaps, providing new signal heads with backplates, and counting and retiming the traffic signal. 98083~|~1~|~1~|~01/BRO~|~Replacement of an existing 7 span bridge that carries Kennedy Avenue over the Genesee & Wyoming railroad. 114690~|~1~|~1~|~01/IMS~|~Lighting replacements on Interstate routes in D8. 93887~|~1~|~1~|~01/IMS~|~Construction of five noise walls on Interstate 76 in the Lake Milton area, Milton Township. 120285~|~1~|~1~|~01/SAF/HUDS~|~Pedestrian improvements on various routes in the City of Hudson. 91492~|~1~|~1~|~01/NHS~|~Gahanna urban paving on NHS routeFRA-317: 16.72 to 18.89 116942~|~1~|~1~|~01/S>2~|~Roadway Improvement 116942~|~1~|~2~|~02/SAF~|~Sidewalks 120321~|~1~|~1~|~01/NHS~|~added plan split. 92496~|~1~|~1~|~01/SAE~|~Pavement markings 88009~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7730217 Bank Street Bridge over Little Cuyahoga River 115750~|~1~|~1~|~01/NHS~|~Split for the ramp deck replacement and repairs to the SR-176 bridge 112733~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to MAR-746-6.25 and MAR-37-9.43 119270~|~1~|~1~|~01/STR~|~Guardrail maintenance 92313~|~1~|~1~|~01/NHS~|~Culvert replacement 95160~|~1~|~1~|~01/STR~|~Remove and replace the roadway culvert structures on State Route 29 at SLM 0.07, 10.96, and 12.90. 101446~|~1~|~3~|~03/NHS~|~LOR-SR58-24.92 SFN: 4703510 (BRANCH OF BEAVER CREEK)/Treatment Type (61): Bridge Railing Upgrade/Repair.LOR-SR58-26.29 SFN: 4703634 (MARTIN RUN)/Treatment Type (61): Bridge Railing Upgrade/Repair. 101446~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% (Lorain) Urbanized Area Inside Corp. Limit (Paving Items): LOR 58 24.66 to 27.56 (RT/LT) 101446~|~1~|~2~|~02/NHS~|~100% Local (lorain): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): LOR 58 24.66 to 27.56 (RT/LT) 95766~|~1~|~1~|~01/STR~|~SAN-590 from SLM 10.07 to SLM 14.59 119737~|~1~|~1~|~01/BRF/XEN~|~Replacement of the Sycamore Street bridge (SFN 2960192) in the City of Xenia. 95968~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This plan split uses 100% 4MA7 funds. All work in this project is in this split. 121892~|~1~|~1~|~01/STR~|~Bridge replacement of COS SR 83 05.90 (SFN 1601202) 92889~|~1~|~1~|~01/S<2~|~Bridge Work:ERI US6 10.090 SFN 2201666, OVER PIPE CREEK. 92889~|~1~|~4~|~04/S<2~|~ERI-250-0.00 TO 0.49, Concrete Repairs in Sandusky (50/50% FED/LOC) Associate Add 92889~|~1~|~2~|~02/S<2~|~S<2 Urban paving Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): ERI US 6 SLM 06.41 to 11.34.Railroad Location ERI-US6-6.59 and 6.61 92889~|~1~|~3~|~03/S<2~|~100% City of Sandusky Items Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, curb removed, curb, etc.): ERI US 6 SLM 06.41 to 11.34. 104278~|~1~|~1~|~01/STR~|~SMOOTH SEAL 112675~|~1~|~1~|~01/ERD~|~LED lighting upgrade in D-4 112675~|~1~|~2~|~02/ERD~|~LED Lighting upgrade for D-12 121026~|~1~|~1~|~01/NHS~|~bridge liner plan split. 110461~|~1~|~1~|~01/SAE~|~Implement high friction surface course, remove wooden posts, extend guardrail, and upgrade the guardrail end terminal on southbound Green Tree Road at the intersection with SR-123. 83037~|~1~|~2~|~02/NHS~|~Plan split for SFN 0401129 ATB SR 11 8.56 under Mill Rd, SFN 0401153 ATB SR 11 9.35 under Sentinel Rd, SFN 0401161 ATB SR 11 10.42 under Allen Comp Rd, SFN 0401137 ATB SR 11 12.48 under Footville-Richmond Rd 83037~|~1~|~3~|~03/STR~|~Plan split for culvert SFN 0401218 ATB SR 11 10.69 over Tributary of Mill Creek 83037~|~1~|~1~|~01/NHS~|~Resurfacing ATB SR 11 from 8.04 to 13.95 119042~|~1~|~1~|~01/S>2~|~Urban area plan split for storm sewer and culvert work along FRA-62 111450~|~1~|~1~|~01/MPO~|~Planing and resurfacing in Wooster - various streets 90885~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/OT/LANC" City of Lancaster SRTS -Total project Cap of $453,385 w/ $45,977 utilized in PE and $407,408 available for Const/CE. Project to add sidewalks and various safety improvements on various City Streets being funded at 100% up to project cap. 90871~|~1~|~1~|~01/BRO~|~7400306 SEN SR12 10.49 Intersect: Fishe Ditch 117341~|~1~|~1~|~01/BRF~|~Primary Plan Split for Local Bridge Program eligible scope items. 105012~|~1~|~1~|~01/NFA~|~Forest Hills Local School System - School bus replacement project 95740~|~1~|~1~|~01/STR~|~WIL-20 from SLM 0.00 to 12.03 99575~|~1~|~1~|~01/STR~|~SR-576 from 16.55 to 20.52 SR-49 from 16.27 to 20.52= 99575~|~1~|~3~|~03/STR~|~Conduit (Culvert) at WIL-576-19.67 99575~|~2~|~4~|~04/STR~|~Plans Split for Part 2 bridge - Wil-576-20.11 99575~|~1~|~2~|~02/STR~|~for Bridge WIL-576 @ 17.73 111469~|~1~|~1~|~01/STR~|~Culvert replacement. All work in this project. District Preservation Program funds. No local funds. 110485~|~1~|~1~|~01/SAF~|~Widen existing berm areas four(4) on both sides of the roadway to improve the recovery zone. This will improve the recovery area for vehicle traffic and will allow us to designate a bike lane on each side improving the safety for both the vehicle traffic and the cyclist. 98186~|~1~|~1~|~01/STR~|~STP Rural resurfacing 80/20 Fed/State PIC-207-0.00 to 9.57 106540~|~1~|~1~|~01/BRF~|~PIK CR 9 5.29 (SFN 6630839) 95858~|~1~|~1~|~01/NFP~|~Culvert at SLM 10.89 in Metamora. 95575~|~1~|~1~|~01/IMS~|~SFN 8706034 bridge crash damage repairs 79059~|~1~|~1~|~01/MPO~|~Pavement repair 100676~|~1~|~1~|~01/STR~|~Microsurfacing COL-172 120594~|~1~|~1~|~01/SAF/LANC~|~Pedestrian improvements 109810~|~1~|~1~|~01/SAE~|~Installation of new guardrail and upgrades to existing guardrail on various county roads in Clinton County. 123003~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 96777~|~1~|~1~|~01/STR/PIK~|~It is proposed to replace the Jasper Road Bridge (SFN 6631096) on CR 43 (SLM 3.26). 80032~|~1~|~1~|~01/BRO~|~6201172 OTT SR51 3.85 Intersect: Toussaint Creek 116426~|~1~|~1~|~01/MPO~|~Reconstruction and resurfacing of two sections of E. Broadway St. 89068~|~1~|~2~|~02/NHS~|~US 50 portion of the Brent Spence Bridge relocation project 89068~|~1~|~3~|~03/IMS~|~Bridge work for Brent Spence Bridge project 89068~|~1~|~1~|~01/IMS~|~Construction funds for BSB. 99503~|~1~|~1~|~01/SAF/LCEO~|~Licking County CEAO HSIP Funds - 4HB7 (Federal 100%) - See CAP Comments - Installation of new/replacement guard rail on various county roads 96815~|~1~|~2~|~02/NHS~|~Priority System resurfacing of TUS-36 from SLM 15.92 to SLM 17.63 and on TUS-250 from SLM 21.45 to SLM 23.46 including joint repairs and pavement markings. 96815~|~1~|~1~|~01/STR~|~Priority System resurfacing of TUS-36 from SLM 15.37 to SLM 15.92 including joint repairs and pavement markings. 104480~|~1~|~1~|~01/NFP~|~Plan split for tree trimming in the interstate system. 115988~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - 80% Federal (4SF7) and 20% State (4SS7) - rehabilitation of rock slope and roadside ditch. 96277~|~1~|~1~|~01/IMS~|~Project o groove the pavement to increase the friction within the curve along Interstate Route 75 at 15.03 SLM 95808~|~1~|~1~|~01/STR~|~STP Rural, BEL-149-13.99 and various other sites for culvert repair/replacement. 106128~|~1~|~1~|~01/NHS~|~Demolition project on Chesapeake ByPass. 101268~|~1~|~1~|~01/S>2/MASS~|~Resurfacing, urban paving in the City of Massillon. 101268~|~1~|~2~|~02/S>2/MASS~|~Full and partial depth repairs and curb ramp replacements/repairs in the City of Massillon. 92854~|~1~|~1~|~01/STR~|~LAW SR93 23.05 Slide Repair On SR93, begin project 3.78 miles south of the Jackon County line. 80 Fed/20 State 01/STR/OT/State 110008~|~1~|~1~|~01/NHS~|~Resurfacing on HAM-126 110008~|~1~|~2~|~02/SAF~|~Longitudinal grooving in S curves 113838~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 123681~|~1~|~1~|~01/NHS~|~plan spit for bridge work 116465~|~1~|~1~|~01/MPO/FPAR~|~Upgrades to 14 signalized intersections including new controllers, new detection, interconnect and incorporation into a central based system. 116465~|~1~|~2~|~02/SAF~|~100% local funded for Winton Rd/Smiley Avenue/Cobblewood Plaza, Kemper Rd/Hanover Rd and Northland Blvd/Sharon Road 119988~|~1~|~1~|~01/NFA~|~All work included in this split. 103719~|~1~|~1~|~01/SAF~|~Install fiber optic cable 110964~|~1~|~1~|~01/IMS~|~Construct new interchange and associated roadways on IR 71 at Big Walnut Rd (TR 109) 105745~|~1~|~2~|~02/NFP~|~Plan split for SR-282 105745~|~1~|~1~|~01/STR~|~Added new split 1 110786~|~1~|~1~|~01/CMQ~|~Construction of a 1 O' wide asphalt bike path. 79275~|~2~|~2~|~02/SAF~|~100% Local for the Alternate Bid Items 79275~|~1~|~1~|~01/SAF~|~Replacement of existing traffic signals on Perkins Avenue 114655~|~1~|~1~|~01/STR~|~Project to replace bridge CLI-28-0807 that carries SR 28 over Lytle Creek 115713~|~1~|~1~|~01/NFP~|~Established Plan Split 01/NFP/OT/ - District Preservation Funding 100% State (4PS7) 94233~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split. 123628~|~1~|~1~|~01/NHS~|~Funding Split for NHS 112818~|~1~|~1~|~01/S5K~|~Marion Urban Area Plan Split: MAR-529-2.59-2.83 112818~|~1~|~2~|~02/STR~|~Rural Plan Split: MAR-529-2.83-9.29 112818~|~1~|~3~|~03/STR~|~Bridge split for SFN 5103622 along MAR-529-0722 for replacement of exterior box beams, railing & concrete patching of the abutments. 102750~|~1~|~1~|~01/STR~|~This plan split is for bridge repair on the rural route. 105712~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7. 80467~|~1~|~1~|~01/NFA~|~Provide hike/ bike trail to connect Villages of Williamsburg and Batavia to Eastfork State Park and Harsha Lake using a combination of separate trails and shared use roads. Phase 1 is Village of Williamsburg to Eastfork State Park Campground. 93550~|~1~|~1~|~01/BRF~|~Bridge over Grassy Creek 118540~|~1~|~1~|~01/NFA~|~added plan split. 101064~|~1~|~1~|~01/SAF~|~Close the east leg of Rozelle Creek Road at ROS 23 4.97 101064~|~1~|~2~|~02/NHS~|~Barrier replacement.ROS 35 3.64R (SFN 7101562) 101064~|~1~|~3~|~03/NHS~|~Barrier replacement.ROS US 23 12.22. 95819~|~1~|~2~|~02/NFP~|~Urban Paving ineligible items. 95819~|~1~|~1~|~01/NHS~|~Urban Paving eligible items 112361~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV/ - Plan Split 1 93604~|~1~|~2~|~02/IMS~|~Part 2 - LUC-75-3.01 SFN 4803183 Bridge redeck 93604~|~1~|~1~|~01/IMS~|~Part 1 - LUC-75 from SLM 2.75 to SLM 4.52 112944~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 99448~|~1~|~1~|~01/NFP~|~Spot pavement repairs of various routes in ATB, MAH, TRU counties in District 4. 102693~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip-seal treatment. ATH 356 0.00-1.50 and VIN 356 0.00-5.97. Not on the federal aid system funded 100% state. 102693~|~1~|~3~|~03/NFP~|~ODNR Division of Wildlife project to include microsurfacing access road and parking area repairs at the Racine Ohio River Access in Meigs County. Funded 100% state. 102693~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip-seal treatment. ATH 356 1.50-4.77, GAL 325 7.28-14.21, HOC 180 0.39-7.35 and VIN 324 7.28-12.02. Funded 80 Federal/20 State. 110428~|~2~|~2~|~02/STR~|~Work to replace culverts designed under the project ALL SR 309-19.31/20.03/23.02, PID 105570 to be part 2 of the contract. All the funds from the District Preservation Program budget. No local funds. 110428~|~1~|~1~|~01/SAE~|~All the work in the project for the intersection improvements on SR 309 in Allen County at the intersections with Thayer Road SLM 18.19 and Napoleon Road SLM 22.33 are in this split. Construction Contract subphase funding is 100% federal funds from the Safety Program. Roundabouts are eligible for 100% federal funding. 110428~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 106100~|~1~|~1~|~01/S<2~|~Columbus Urban Area Plan Split: FRA-674-1.99-2.07 & 2.26-4.68 106100~|~1~|~2~|~02/S>2~|~Urban Paving Plan Split: FRA-674-2.07-2.13 & 2.26-4.68 100492~|~1~|~1~|~01/NHS~|~LAW 93 6.86-10.72 106508~|~1~|~1~|~01/S>2~|~Construction of roundabouts at the ramps of US Route 52 and State Route 243. 106508~|~1~|~2~|~02/S>2~|~Plan split to cover change order for median crossover. 92017~|~1~|~1~|~01/NHS~|~Major Bridge Funds 104887~|~1~|~1~|~01/NFA~|~District wide deck sealing project. 107679~|~1~|~1~|~01/MPO~|~Resurfacing of Infirmary Rd CR-164 from SR 14 to SR 303. 90053~|~1~|~1~|~01/ENH/JOHN~|~"01/ENV/OT/JOHN" - Enhancement Project 4B37 (80% Federal) / 4BG7 (20% Local) - CAP of $312,200.00 federal dollars - Village of Johnstown Project Streetscape in downtown area. 117102~|~1~|~1~|~01/ENH/BKLK~|~"01/ENH/21/BKLK" - plan split for widening and construction of multimodal improvements along SR 79 in village of Buckeye Lake. 117102~|~1~|~2~|~02/S50/BUCK~|~widening and construction of multimodal improvements along SR 79 in village of Buckeye Lake. 121652~|~1~|~1~|~01/MPO~|~Concrete bus pads in the Downtown Business District of Columbus 119215~|~1~|~1~|~01/NHS~|~NHS plan split 119215~|~1~|~2~|~02/STR~|~Rural plan split 119215~|~1~|~3~|~03/S>2~|~Columbus urban area plan split. 110985~|~1~|~1~|~01/BRF~|~Bridge replacement. 113126~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment. 117928~|~1~|~1~|~01/NFA~|~NEVI Phase 1 -77-C 116424~|~1~|~1~|~01/MPO~|~Plan Split - All work to resurface Luckey Road. 116424~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope item - asphalt rejuvenating agent 83443~|~1~|~1~|~01/S<2~|~Bridge Replacement 97621~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 160 11.55. GSM funds. Rural other federal aid system, funded 100% State. 106311~|~1~|~1~|~01/MPO~|~Maple Avenue from Dayton Yellow Springs to Doris. Widening to 3 vehicular lanes and 2 bike lanes. Mill and resurfacing and full depth pavement repair as needed. New curb, gutter, and storm sewer system. 106311~|~1~|~2~|~02/NFP~|~Plan split for 100% local utility improvements. 101460~|~1~|~1~|~01/STR~|~DSR# TUS-002 114466~|~1~|~1~|~01/STR~|~CEAO STP funding for pavement markings 114466~|~1~|~2~|~02/S5K~|~Plan split for urbanized area (5k-49k) 97422~|~1~|~1~|~01/STR~|~Replace three culverts, two in COL county and one in HAS county. COL-170-19.43, COL-172-6.27 and HAS-151-4.16 117836~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 1004 2.27, SFN 5634857. Work includes abutments and approach work. 114535~|~1~|~1~|~01/NFP~|~D09 Culvert Project FY27 100808~|~1~|~1~|~01/IMS~|~Overlay, replace barriers and add a sidewalk to bridge HAM-275-3188 (Cornell Rd over I-275) Replace deck of bridge HAM-275-3270 and incorporate a sidewalk. 90568~|~1~|~2~|~02/NFP~|~This funding event is for painting the parking stall markings at the county garages and at the district complex using 4CP7 funding sac. 90568~|~1~|~1~|~01/NFP~|~100% State funds (4MP7) for district wide auxiliary pavement marking 107364~|~1~|~1~|~01/STR~|~District Preservation Pavement Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Spot Paving and repairs on selected OFAH-Rural Roadways in District 5 107364~|~1~|~2~|~02/NFA~|~Plan split 02/NFA/PV/ - 100% State (4PS7) for Per-668 113167~|~1~|~1~|~01/S>2~|~Roadway mill and fill resurfacing and thermo striping on: CR24-9.65 to 11.80 122869~|~1~|~1~|~01/NFP~|~All truck parking construction work to be included in this split. 93197~|~1~|~1~|~01/STR~|~Generaly system paving of:MAR-309: 22.52-26.88MRW-309: 0-2.48MAR-309: 26.88-29.30 97732~|~1~|~1~|~01/STR~|~Spot paving locations throughout Holmes, Tuscarawas and western Carroll Counties. 90817~|~1~|~1~|~01/NHS~|~4801393 LUC US24 13.98 Intersect: Fallen Timbers Ln C-2089 4802616 LUC SR65 0.83 Intersect: Csx Railroad; 4802667 LUC SR51 3.32 Intersect: Swan Creek 120430~|~1~|~1~|~01/STR~|~Plan Split 01/STR/OT - 100% State 92414~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing with asphalt concrete on parking areas at CLA George Rogers Clark Park at the Interchange of SR 4 and SR 309. 116992~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban locations 107061~|~1~|~1~|~01/ENH~|~Plan Split 100599~|~1~|~1~|~01/STR~|~Resurfacing JEF-250 from SLM 0.00 to 2.51 and HAS-250 in the village of Harrisville. 114846~|~1~|~1~|~01/STR~|~Plan split for resurfacing 124626~|~1~|~1~|~01/IMS~|~Plan Split for replacing the existing 4 lane portion of PRE-70 124626~|~1~|~2~|~02/IMS~|~Plan Split for the new added lanes on PRE-70 124626~|~1~|~3~|~03/IMS~|~Plan split for bridge work 105686~|~1~|~1~|~01/IMS~|~District Preservation Program 96715~|~1~|~1~|~01/NFP~|~ODNR funded project. Resurfacing and culverts at HOC Hocking State Forest. Non federal aid project funded 100% state. 100953~|~1~|~1~|~01/NHS~|~This plan split is for all work in the project. There are no federal funds used. All funds are 100% state funds from the District Preservation Program budget. 80736~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1813102, 1813110, 1806327, 1806343, 1806351 112884~|~1~|~1~|~01/STR~|~MAD-40 from 0.0 to 6.64 - A roadway and miscellaneous items associated with project. 112884~|~1~|~2~|~02/STR~|~Replace culvert (structure) MAD-40-5.899 over Roberts Ditch SFN 4900782 93161~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 6002463 MUS IR70 4.6 Intersect: I-70 Under CR 34 Ridge Rd; BR Eligible for Rehabilitation: Length=283 SD/FO(2) SR=66.5 DSR=6 110666~|~1~|~1~|~01/STR~|~Resurfacing of TRU SR 46 from 18.45 to 23.64. 110071~|~1~|~1~|~01/NFP~|~Bridge Operation plan split 109290~|~1~|~1~|~01/NFP~|~ODNR resurfacing project at Pike Lake State Park. 94407~|~1~|~2~|~02/S>2~|~This split is for the work on SR 20A @ Whitehouse-Spencer Road. Install Roundabout 94407~|~1~|~3~|~03/S>2~|~Funding for 8' X 5' Box under Whitehouse-Spencer roundabout. State Bridge Only 94407~|~1~|~1~|~01/NHS~|~This split is for the work on SR 20A @ SR 295. Install roundabout. 84685~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds for the District budget SAC 4MP7. 95245~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 83 0200, SFN 6101623. Rural other federal aid funded 80 federal/20 state. 94659~|~1~|~2~|~02/NFA~|~TR-128 from TR45 to TR81 TR-45 from TR128 to SR18 TR-129 from CR46 to TR135 TR-135 from old SR18 to new SR18 94659~|~1~|~1~|~01/STR~|~SR-18 in North Baltimore from SLM 11.57 to SLM 12.40 98426~|~1~|~2~|~02/S<2~|~Asphalt resurfacing 80%/20% Federal/State. Location is MEG 833 0.35-2.79. 98426~|~1~|~1~|~01/S<2~|~Install Culvert and storm sewer at MEG 833 0.20-0.25 location. 80/20% Federal/State. 109531~|~1~|~1~|~01/BRO~|~Bridge repair plan split 111383~|~1~|~1~|~01/S<2~|~Work on structures MAR-4-11.63 an MAR-4D-0.74 111383~|~2~|~2~|~02/SAF~|~SR 4 & 4D signals on State Street & Prospect Street, respectively. 107501~|~1~|~1~|~01/NFA~|~Resurfacing SR 179 94528~|~1~|~1~|~01/IMS~|~Rockfall Maintenance project. NOB IR 77 10.72-10.83. Interstate route funded 90% Federal/10% State. 120986~|~1~|~1~|~01/STR~|~Culvert Replacement GAL 218-4.81/8.60 123348~|~1~|~1~|~01/SAF~|~All work included in this plan split. 25521~|~1~|~1~|~01/IMS~|~WOO IR75 19.91-26.09, now 100% state 25521~|~1~|~2~|~02/IMS~|~SFNs: 8706514 & 8706816 25521~|~2~|~3~|~03/IMS~|~New pavement to eliminate weave 25521~|~2~|~4~|~04/IMS~|~New bridge SFN 8706530 110282~|~1~|~1~|~01/STR~|~Jack and Bore Culvert Replacement 98206~|~1~|~4~|~04/NHS~|~"04/NHS/OT/ " District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on NHS Routes for: COS-36-(26.49 to 33.59), COS-16-(0.00 to 8.93), GUE-22-(10.28 to 31.04), MUS-16-(0.00 to 6.41), MUS-16-(11.74 to 14.86) 98206~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Fast Dry Pavement Markings on Interstate Routes for: GUE-70-(0.00 to 28.48), GUE-77-(2.51 to 17.70), MUS-70-(1.46 to 27.35) 98206~|~1~|~2~|~02/S<2~|~?02/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry PM on OFAH-Urban for: COS-36-(16.14 to 18.95), COS-83-(7.99 to 8.59), COS-83-(12.75 to 13.67), GUE-22-(9.28 to 10.28), GUE-40-(9.40 to 11.99), GUE-209-(7.07 to 7.64), GUE-209-(10.71 to 14.76), GUE-660-(4.05 to 6.33), GUE-821-(3.40 to 5.94), MUS-22-(1.17 to 9.76), MUS-22-(13.27 to 19.78), MUS-40-(5.10 to 9.15), MUS-60-(11.96 to 15.02), MUS-60-(21.77 to 25.08), MUS-93-(12.78 to 13.92), MUS-345-(1.60 to 2.52), MUS-555-(8.60 to 11.44), MUS-666-(1.78 to 4.85), MUS-719-(0.00 to 0.61). 98206~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry PM on OFAH-Rural for: COS-36-(0.00 to 16.14), COS-60-(0.00 to 7.58), COS-60-(7.71 to 14.52), COS-79-(0.00 to 12.37), COS-83-(0.00 to 7.99), COS-83-(8.59 to 9.02), COS-83-(13.67 to 26.68), COS-93D-(0.00 to 0.28), COS-93-(0.00 to 22.67), COS-229-(0.00 to 0.70), COS-541-(31.59 to 34.62), GUE-40-(11.99 to 16.21), GUE-83-(0.69 to 11.29), GUE-146-(0.00 to 9.92), GUE-265-(0.00 to 4.59), GUE-513-(0.00 to 14.74), GUE-541-(0.00 to 8.32), GUE-658-(0.00 to 11.07), GUE-800-(0.00 to 2.48), GUE-821-(0.00 to 0.47), GUE-821-(0.60 to 3.40), MUS-22-(0.00 to 1.17), MUS-22-(19.78 to 27.63), MUS-40-(1.08 to 5.10), MUS-60-(0.00 to 11.96), MUS-60-(25.08 to 35.51), MUS-83-(0.00 to 14.98), MUS-93-(13.92 to 30.97), MUS-93-(31.28 to 34.58), MUS-146-(0.00 to 2.21), MUS-146-(25.78 to 33.76), MUS-345-(0.00 to 1.60), MUS-555-(4.02 to 8.60), MUS-586-(0.00 to 4.63), TUS-93-(0.00 to 0.49) 98206~|~1~|~5~|~05/NFA~|~"05/NFA/OT/ " District Preservation 4PS7 (100% State) - No CAP - Fast Dry Pavement Markings on NFA Routes for: COS-206-(5.87 to 6.52), COS-662-(0.00 to 0.42), COS-715-(0.00 to 2.54), COS-715-(3.19 to 8.14), GUE-209-(0.00 to 7.07), GUE-285-(9.47 to 13.46), GUE-313-(0.00 to 1.24), GUE-340-(0.00 to 0.86), GUE-660-(0.00 to 4.05), GUE-662-(0.00 to 7.27), GUE-672-(0.00 to 2.74), GUE-761-(0.00 to 2.43), MRG-555-(26.73 to 27.16), MUS-208-(0.00 to 11.19), MUS-209-(0.00 to 1.64), MUS-284-(0.00 to 13.36), MUS-313-(0.00 to 7.13), MUS-340-(0.00 to 3.64), MUS-555-(0.00 to 4.02), MUS-662-(0.00 to 0.45), MUS-666-(4.85 to 14.17), NOB-340-(0.00 to 0.71), NOB-672-(0.00 to 0.37) 106247~|~1~|~1~|~01/NFA~|~The County will realign, widen and reconstruct 688 feet of Mill Street and 213 feet of Supreme St, construct radii improvements to the intersections of Larchmont Ave and Mill St and North River Rd and Supreme St. 122981~|~1~|~1~|~01/BRF~|~Plan Split for Municipal Bridge funded bridges 110825~|~1~|~1~|~01/NHS~|~Rock fall remediation 96338~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Bridge replacement on 6006515 MUS-666-4.49 Intersect: Over Ditch; Not BR Eligible: Length=15 SD/FO(1) SR=48.6 DSR= 6; 100026~|~1~|~1~|~01/MPO~|~80% federal pariticipation with a 20% local matching funds for eligible streetscape work items. 106411~|~1~|~1~|~01/SAF~|~Ramp improvements at the I-275 & US-42 interchange; Re-assigning lane usage on US-42 through interchange and at Hauck Rd 106411~|~1~|~2~|~02/SAF~|~Replacement of an existing CCTV camera. 106411~|~2~|~3~|~03/MPO~|~Widening of Hauck Road (from just west of the Norfolk Southern crossing to 500' west of US-42) to three lanes to add a center two way left turn lane. In addition curb and gutter will be constructed, replacement of the storm sewer system and construction of a sidewalk on the north side of Hauck Road. 106411~|~2~|~4~|~04/MPO~|~Plan split for the construction of sidewalk along Hauck Road for the length of the project. 106411~|~2~|~5~|~05/SAF~|~Widening of Hauck Road to three lanes to add a center two way left turn lane. In addition curb and gutter will be constructed, replacement of the storm sewer system and construction of a sidewalk on the north side of Hauck Road. 106411~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 119181~|~1~|~1~|~01/NHS~|~Plan split for LUC-20-0388 bridge 109047~|~1~|~1~|~01/NFA~|~Rehabilitation project of a historic covered bridge. WAS Hills Covered Bridge, SFN 8430799. TAP funded project using Toll Revenue Credit. 116638~|~1~|~1~|~01/NFP~|~Signal Replacements. 94238~|~1~|~1~|~01/IMS~|~AC overlay with repairs on:HAM-75 SLM 0.22 to 0.90HAM-75 SLM 0.90 to 2.39 94238~|~1~|~2~|~02/IMS~|~Plan Split for Bridge work 119861~|~1~|~1~|~01/S5K~|~All Work Included in this Split 112913~|~1~|~1~|~01/STR~|~Resurfacing SR 170 89254~|~1~|~1~|~01/BRO~|~4863119 LUC WHEEL 0.24 M. N. OF STARR AVE.Intersect: OTTER CREEK 103275~|~1~|~1~|~01/NFP~|~Sign replacements on various routes throughout MAH, POR and SUM Counties. 98447~|~1~|~3~|~03/SAE~|~Safety application for stop bar and advance radar detection on all 4 approaches of the HUR-224/61 intersection . 98447~|~1~|~2~|~02/NHS~|~Bridge maintenance work on 7 linked bridges. 98447~|~1~|~1~|~01/NHS~|~Hur-224 Resurfacing 98788~|~1~|~1~|~01/NFA~|~Micro surface the existing parking lot and entrance drive at Johnston Farms. 105137~|~1~|~1~|~01/IMS~|~Mill and fill FRA-270 Mainline from 29.39 to 31.60Mill and fill FRA-270 CD lanes from 30.60 to 33.58 110584~|~1~|~1~|~01/STR~|~RESURFACING SR-41 SLM 22.18 TO SLM 24.45. RESURFACING SR-734 SLM 4.43 TO 5.22. 110584~|~1~|~2~|~02/NFA~|~RESURFACING SR-729 SLM 9.67 TO 10.51. 110584~|~1~|~3~|~03/STR/Jeff~|~Pavement repair and guardrail replacement to be paid 100% by the Village of Jeffersonville using OPWC funds 113016~|~1~|~1~|~01/ENH/STOW~|~Construct 10' wide asphalt hike and bike trail between SR 8 and Springdale Rd in the city of Stow. 119743~|~1~|~1~|~01/NFP~|~Creating Plan Split for TED Involvement 101500~|~1~|~1~|~01/STR~|~DSR# BEL-019 93979~|~1~|~1~|~01/S>2~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2013-2014 used for Construction Inspection services. 103262~|~1~|~1~|~01/SAF~|~District wide fast dry pavement markers. 102839~|~1~|~1~|~01/NHS~|~Resurfacing on NHS System. 102839~|~1~|~2~|~02/S<2~|~Plan Split for STP<200000, MAR-95 102839~|~1~|~3~|~03/STR~|~Plan Split for STP Rural 102635~|~1~|~1~|~01/STR~|~Bridge Deck Replacement: CRA-19-26.18 (SFN 1700855) 116538~|~1~|~1~|~01/IMS~|~Culvert Replacement Project. NOB-77-11.97 CFN: 1886097 and NOB-77-13.574 CFN: 1875682 113758~|~1~|~1~|~01/SAF~|~Retrofit various traffic control items on FRA-33-4.36 to 8.79 and MAR-23-15.22 t0 15.27 102788~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CY 2022. Funded 100% state. 109300~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail 114789~|~1~|~1~|~01/STR~|~Rural plan split for the following sections: DEL-47-0.00-1.07 MAR-47-0.62-2.45 UNI-47-13.55-15.00 109619~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Replacement of School Flashers at various locations on NOFAS-Rural locations. 112133~|~1~|~1~|~01/BRO~|~All the work in this project to replace the bridge deck and do other bridge work. Federal and state funds from the District Preservation Program budget. 117485~|~1~|~1~|~01/NFA/ASCE~|~Superstructure replacement. 111032~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP) - Replacement of the deficient bridge (SFN 3004058) which is BR Eligible: L=848'; SD/FO (1); DSR 4; SR 58.2 97197~|~1~|~1~|~01/SAF~|~Safety/Local funding to reconstruct signal and convert RTL to through lane EB from I-270 through McNaughten 119449~|~1~|~1~|~01/BRF~|~CEAO 100% LBR funding 117450~|~1~|~1~|~01/SAF~|~Plan split for Franklin County ding and dent guardrail on various routes. 103080~|~1~|~1~|~01/NHS~|~This is for resurfacing of Covington Street (US 36) in Piqua 98465~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 116600~|~1~|~1~|~01/S>2~|~Columbus urban area plan split for resurfacing and resurfacing related items on FRA-40-4.43-4.69. 112758~|~1~|~1~|~01/STR~|~Systemmatic Sign Replacement. 120035~|~1~|~1~|~01/S5K~|~Intersection Improvement 97627~|~1~|~3~|~03/BRF~|~Replace MAD-TR 48-1.45 (Goodson Rd) structure over Lucas Ditch SFN 4932110 97627~|~1~|~2~|~02/BRF~|~Replace MAD-CR 84-2.51 (Van Wagner Rd) structure over Bradford Creek SFN 4930576 97627~|~1~|~1~|~01/BRF~|~Replace MAD-CR 113-0.60 (Tradersville-Brighton Rd) structure over Georges Creek SFN 4931726 99828~|~1~|~1~|~01/MPO~|~Funding to cover construction of bike trail and bike lanes. 114792~|~1~|~1~|~01/NHS~|~NHS plan split. 114792~|~1~|~2~|~02/S<2~|~STP<2 plan split. 114792~|~1~|~3~|~03/STR~|~Rural plan split. 100924~|~1~|~1~|~01/S>2~|~Widening of Kemp Road to three lanes from Grange Hall Road to Meadowcourt Drive. Addition of curb and gutter and storm sewer system. An 8' wide sidewalk will be constructed on the north side of the roadway and a 5' wide sidewalk will be constructed on the south side of the roadway. 121243~|~1~|~1~|~01/SAF~|~interstate lighting maintenance 107462~|~1~|~1~|~01/NFP~|~Chip seal 90837~|~1~|~1~|~01/SAE/MtOr~|~It is proposed to construct sidewalks along Boyd road, Tri-County Road, Campus Drive, Western Ave., and between Campus Drive and Western Ave. so that children can safely walk and bike to and from school. 100% federal Safe Routes to School Program 96671~|~1~|~6~|~06/S>2~|~Resurface STA SR 93 from 4.13 to 5.84. 96671~|~1~|~3~|~03/STR~|~Resurface STA SR 93 from 0.00 to 3.36 and 3.72 to 4.13, Resurface STA SR 212 from 0.00 to 2.38. 96671~|~1~|~7~|~07/S>2~|~Minor bridge work to linked structures >20' span. 96671~|~1~|~2~|~02/NHS~|~Minor bridge work to linked structure >20' span. 96671~|~1~|~4~|~04/STR~|~Minor bridge work to linked structures >20' span. 96671~|~1~|~5~|~05/STR~|~Minor bridge work to linked structure 10' to 20' span. 96671~|~1~|~1~|~01/NHS~|~Resurfacing and rumble stripes on STA US 250 from 0.00 to 1.21 and 1.28 to 4.14. 96671~|~1~|~8~|~08/SAE~|~Adding rumble stripes. 115598~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 105190~|~1~|~1~|~01/STR~|~Fine graded polymer asphalt resurfacing of US 62 and SR 39 86053~|~1~|~1~|~01/BRO~|~SFN 7760361 0.22 State St. over Ohio Canal 103271~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay on GAL US 35 1693 L (SFN 2701324), R (SFN 2701359), and GAL SR 735 1.14 (SFN 2701383). 103271~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay on GAL SR 588 3.24 (2700840). 80113~|~1~|~1~|~01/NHS~|~Rehabilitate Bridge JEF-7-1348 (SFN 4100727) by replacing existing concrete deck with a new reinforced concrete deck, reapiring substructure and painting structural steel. 80113~|~1~|~2~|~02/NHS~|~Funding event created for on-going services to be provided by Consultant during the construction phase of the rehabilitation of bridge JEF-7-1348. 122885~|~1~|~1~|~01/NFP~|~All work included in this plan split. 95769~|~1~|~1~|~01/STR~|~SAN-6 from SLM 23.43 to SLM 32.43 95769~|~1~|~2~|~02/STR~|~Bridge Split 95769~|~1~|~3~|~03/STR~|~Split for SFN 7200846 121306~|~1~|~1~|~01/S>2~|~STP>200,000 Plan split 121306~|~1~|~2~|~02/STR~|~STP Rural Plan Split 121306~|~1~|~3~|~03/S>2/COC~|~COC Plan Split 121306~|~1~|~4~|~04/S>2/DEL~|~City of Delaware Plan Split 96322~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge replacement on 1602101 COS-SR 93-15.75 Intersect: Over White Eyes Creek; Not BR Eligible: Length=31 SD/FO(0) SR=70.7 DSR=6 100392~|~1~|~1~|~01/MPO~|~Construction of a wooden covered bridge across the Stillwater River at the location of a demolished covered bridge on a section of abandoned roadway of National Road Bridge will provide and enhance access for the existing bikeway. 117389~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 105210~|~1~|~2~|~02/STR~|~Resurfacing. 105210~|~1~|~1~|~01/S5K~|~Resurfacing. 105210~|~1~|~5~|~05/STR~|~Bridge work 10' to 20' span. 105210~|~1~|~3~|~03/S5K~|~Bridge work 10' to 20' span. 108588~|~1~|~1~|~01/NFA~|~The COUNTY will construct concrete stabilization and overlay improvements to approximately 1 mile of Hoaghlin Center Road beginning at Lincoln Hwy and heading in a southerly direction 98241~|~1~|~1~|~01/NFP~|~Electrical maintenance contract for FY 20 98241~|~1~|~2~|~02/NHS~|~Upgrade signing at the intersection of DEL US 36/SR 37 at Wilson Rd using safety funding 98684~|~1~|~1~|~01/NFA~|~CHP CR 193 12.62 (SFN 1130099) Old Troy Pike bridge rehabilitation The bridge project includes replacing the three span superstructure and upgrading the guardrail on Old Troy Pike, 193-1263, over Mad River. New pre-stressed concrete beams will be installed , waterproofed and paved on existing substructure. The project will also fix minor spalling on the pier caps and repair deteriorated abutment wings. All work will be done without distrubing Mad River and within the existing right of way. 103184~|~1~|~1~|~01/IMS~|~Relocation of Columbus power line 103184~|~1~|~2~|~02/IMS/Cols~|~100% City of Columbus Department of Public Service items 117509~|~1~|~1~|~01/IMS~|~Reconstruction of a section of IR 80 due to settlement issues. 100117~|~1~|~1~|~01/STR~|~This plans split is for the entire project funding. 109795~|~1~|~1~|~01/STR~|~Chip seal 109795~|~1~|~2~|~02/NFA~|~Chip seal 109795~|~1~|~3~|~03/S<2~|~Chip Seal 122061~|~1~|~1~|~01/NFP~|~Created for J&C involvement 92106~|~1~|~1~|~01/BRF~|~Tolle Road Bridge Replacement. 6631169 PIK CR47 3.04 Intersect: StreamCEAO Funds. 80 Fed/20 local match by Highland County. 01/BRF/BR/Highland 86920~|~1~|~1~|~01/IMS~|~Bond and State Multilane funding for full depth pvmt replacement01/IMS/PV/ 86920~|~1~|~3~|~03/IMS~|~Guardrail damage caused by motorists and not reimbursed by insurance companies 86920~|~1~|~2~|~02/IMS~|~Bridge painting of 4 overhead structures (not BR eligible):SFN 5901170, MRW-71-6.60, CR26/Olive Green Marengo Fulton RdSFN 5901359, MRW-71-8.25, CR170/Bennington Harmoney Central RdSFN 5901383, MRW-71-9.11, CR25/Waldo Fulton Chesterville RdSFN 5901413, MRW-71-9.94, CR20/Williamsport Bloominggrove RdDeck sealing of 6 mainline bridges (not BR eligible):SFN 5901200, MRW-71-7.05L, Big Walnut CkSFN 5901235, MRW-71-7.05R, Big Walnut CkSFN 5901294, MRW-71-7.56L, TR-232/Kaufman RdSFN 5901324, MRW-71-7.56R, TR-232/Kaufman RdSFN 5901472, MRW-71-12.17L, Kokosing RiverSFN 5901502, MRW-71-12.17R, Kokosing RiverSFN 5901111;MRW-71-5.96 pver abandoned CSX RRSFN 5901146, MRW-71-5.96 Over abandoned CSX RR03/IMS/BR/ 103025~|~1~|~1~|~01/IMS~|~Minor bridge work. 103025~|~1~|~2~|~02/NHS~|~Minor bridge work. 103025~|~1~|~3~|~03/S>2~|~Minor bridge work. 103025~|~1~|~4~|~04/STR~|~Minor bridge work. 122434~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 121247~|~1~|~1~|~01/NHS~|~conduits linked 121247~|~2~|~2~|~02/S>2~|~bridge linked to CO CC lrg urban 101210~|~1~|~1~|~01/NFP~|~Task Order PID for construction inspection services - 4PF7 (60% Federal) / 4PS7 (40% State). 116541~|~1~|~1~|~01/BRF/NFRA~|~Bridge replacement. 100447~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 117405~|~1~|~1~|~01/MPO/NILE~|~Resurfacing. 117464~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 471 0.01, SFN 0547867. 77262~|~1~|~1~|~01/IMS~|~Re-design the IR-76 and SR-21 interchange in the City of Norton, Summit County, Ohio. 97184~|~1~|~1~|~01/NFP~|~ODOT's portion of the rehab project. 97184~|~1~|~2~|~02/NFP~|~KYTC's portion of the project. 100995~|~1~|~1~|~01/NHS~|~Anthony Wayne Trail at Monclova Road. 100995~|~1~|~2~|~02/NHS~|~Plans split for 100% funding lighting items - City of Maumee funded. 105449~|~1~|~1~|~01/NFP~|~Mohican State Park 95796~|~1~|~1~|~01/STR~|~from SLM 0.00 to SLM 5.88 95796~|~1~|~2~|~02/MPO~|~Widening of SR-65 in Grand Rapids 95796~|~2~|~3~|~03/MPO~|~Resurfacing of County Road. 95796~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 92067~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - State Parks Funding 4BF7 (100% State) - No CAP - Resurfacing of the following 1-3/4" asphalt -Entrance Road R-56; Fish Mgt entrance; Fish Mgt parking lot; Wildlife Mgt Entrance; Wildlife Mgt parking; Replacement of culvert at the junction of the Wildlife parking lot and Entrance Road R-56; 92512~|~1~|~1~|~01/BRF~|~Bridge replacement 114964~|~1~|~1~|~01/S>2~|~Resurfacing. 114964~|~1~|~2~|~02/STR~|~Resurfacing. 97990~|~1~|~1~|~01/NHS~|~District Preservation Bridge Rehabilitation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of bridges on LIC-SR 16; (See Linked Bridges) 97990~|~1~|~2~|~02/NHS~|~District Preservation Bridge Replacement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of bridges on LIC-SR 16; (See Linked Bridges) 97990~|~1~|~3~|~03/NHS~|~Costs associated with widening the LIC-16-15.93R and LIC-16-15.60L structures (SFNs 4500725 and 4500695, respectively). 97990~|~1~|~4~|~04/NFA~|~Bridge Strike 115334~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing. 91057~|~1~|~1~|~01/STR~|~Resurfacing of MAD-42 in rural area, D6 federal/state $SLM 0.00-4.80 91057~|~1~|~4~|~04/STR~|~STP Rural deck overlay 100% StateMAD-42-6.32 Oak Run 91057~|~1~|~3~|~03/S<2~|~MAD-42 resurfacing in urban area with D6 federal & local $SLM Left 4.87-5.81SLM 5.92-7.11 91057~|~1~|~2~|~02/S<2~|~MAD-42 resurfacing, urban area with D6 federal/state $SLM 4.80-4.87SLM Right 4.87-5.81SLM 5.81-5.92 109436~|~1~|~1~|~01/SAF~|~Rebuild traffic signal to allow for backplate installation and realign ramp at State Route 741 in Moraine. 120042~|~1~|~1~|~01/ENH~|~Sidewalk project utilizing Carbon Reduction, Safety, and Safe Routes to School Funding up to associated caps. 88498~|~1~|~2~|~02/STR~|~SFN 6201547 repair abutments of existing bridge over Toussaint Creek 88498~|~1~|~1~|~01/STR~|~OTT-SR163 from SLM 4.05 to SLM 9.98 101160~|~1~|~1~|~01/IMS~|~Crack sealing on IR 96438~|~1~|~1~|~01/NHS~|~Replacement of steel beam superstructure with new steel beam superstructure for Bridge JEF-7-2242 (SFN 4101170). The substructure units (piers) will be repaired and abutments will be modified as needed. All existing bearings will be replaced with elastomeric bearings. All concrete surfaces will be sealed. 21901~|~1~|~1~|~01/NHS~|~Replace supertsructure with new steel beam superstructure on bridge COL-30-2807, SFN1502042. Raise bridge to meet current standards and repair pier columns. 93618~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 115146~|~1~|~1~|~01/SAF~|~Split for RR crossing signal work 120044~|~1~|~1~|~01/ENH~|~Reconstruction of sidewalks and corresponding ADA facilities utilizing Federal Carbon Reduction (80%) and Safety (20%) funds up to Federal maximum. 90249~|~1~|~1~|~01/NFA~|~Adams County Guardrail Project - CEAO - 100% Fed. 01/NFA/OT/ADA 108441~|~1~|~2~|~02/NFP~|~100% city funded items no eligible for CMAQ funding 108441~|~1~|~1~|~01/MPO~|~MPO CMAQ plan split 123954~|~1~|~1~|~01/STR~|~geotech plan split. 91127~|~1~|~1~|~01/SAE~|~This plan split is for the traffic signal work items for this project using the safety sac 4HJ7. 91127~|~1~|~2~|~02/ENH~|~This plan split funding event is using transporation enhancement and district preservation funds (4B37 & 4PS7) to construct the sidewalks, ADA ramps and retaining walls that are included in this project. 84859~|~1~|~1~|~01/BRF/COL~|~"01/BRF/BR/COL" - Knox Township, Sections 5 and 8, 0.5 mile east of CR 401. Replace 31' steel beam bridge over unnamed stream. Includes minor profile adjustments, guardrail, striping and signing. 80% federal 4B87/20% TRC. 84859~|~1~|~2~|~02/BRF/COL~|~"02/BRF/BR/COL" - Knox Township, Sections 5 and 8, 0.5 mile east of CR 401. Replace 31' steel beam bridge over unnamed stream. Includes minor profile adjustments, guardrail, striping and signing. CE On Going Services only, 80% federal 4BP7/20% TRC. 124876~|~1~|~1~|~01/SAF~|~Plan split for safety funding for pedestrian crossing enhancements at various intersections, PSIP 102375~|~1~|~2~|~02/IMS~|~All work for construction of new bridge south of existing bridge. 102375~|~1~|~1~|~01/S5K~|~Roadway reconstruction work on CR 99 involving addition of through lanes. (Added capacity.) 102375~|~1~|~3~|~03/IMS~|~All rehabilitation work including deck replacement on existing bridge. 102375~|~1~|~4~|~04/S5K~|~All roadway reconstruction work that does not involve the expansion/widening of the roadway to create additional capacity (through lanes). 124142~|~1~|~1~|~01/NFP~|~Reclamite on one lane of CRA-96-0.00 to 3.66 110519~|~1~|~1~|~01/MPO~|~Purchase of bikes and bike kiosks to expand the Red Bike system in Cincinnati. 113702~|~1~|~1~|~01/MPO~|~Split for TLCI intersection crossing work. 101451~|~1~|~1~|~01/STR/BPOR~|~DSR# BEL-024 117326~|~1~|~1~|~01/STR/FCEO~|~Superstructure replacement of BLO-20-1.964 (SFN 2343363) carrying Pickerington Road over Walnut Creek. 110168~|~1~|~1~|~01/S>2~|~Resurfacing of SR 59 from 0.00 to 1.51 and SR 43D from 0.53 to 0.62 in the City of Kent, Portage County, Ohio. 110168~|~1~|~2~|~02/S>2~|~Partial and full depth pavement repairs, curb and gutter and ADA curb ramps in the city of Kent. 99634~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state 115136~|~1~|~1~|~01/STR~|~Slide repair. 112730~|~1~|~1~|~01/NHS~|~UNI-33-7.85 L/R - Replace box beams 97998~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for Gue-77-0804L 97998~|~2~|~2~|~02/IMS~|~"02/IMS/BR/ " - plan split 02 for Gue-77-0804R 97805~|~1~|~1~|~01/IMS~|~Mowing various routes and locations in BEL, JEF and TUS counties. 107012~|~1~|~1~|~01/IMS~|~Mowing Contract 107012~|~1~|~2~|~02/IMS~|~Mowing contract in D7 on:MOT IR 675 SLM 0.00 to 7.44MOT IR 75 SLM 0.00 to 9.31 101150~|~1~|~1~|~01/NHS~|~Various bridges (3500063) 101150~|~1~|~2~|~02/STR~|~Various bridges (7403909) 121896~|~1~|~1~|~01/SAF~|~Widen roadway and shoulder, remove fixed objects. 121896~|~1~|~2~|~02/SAF~|~Provide EB left turn lane at Van Gorden Rd. 98482~|~1~|~1~|~01/S>2/BARB~|~Concrete repairs at Wooster/State intersection. Total replacement of concrete on State Street from just North of Wooster intersection through Hiram Street (100% Local). 98223~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7 (100% State) - No CAP -Annual contract for placement of Fast Dry long line and auxiliary pavement markings in Western District 5 96824~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation Funding 4PS7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing of Gue SR 258 00.00 to 11.07; 117207~|~1~|~1~|~01/S5K~|~Pedestrian improvements and signal changes eligible for TAP and Safety funds 117207~|~1~|~2~|~02/S5K~|~Plan Split for roadway resurfacing scope, funded by Small City Program. 94726~|~1~|~1~|~01/S<2~|~Widening the north side of the intersection of McKinley Road, Fortman Drive, and Spruce St (SR 66) along with the relocation of the strain poles on the north side of the intersection, curb radius on north side will be increased, new traffic signal controller installed and storm sewer work as needed. 113623~|~1~|~1~|~01/IMS~|~Split for noise barrier replacement on the interstate 101001~|~1~|~1~|~01/NFA~|~Extension of Kinross Lakes Parkway 400 feet south of Wheatley Rd to aid the new construction of Nexen Tire 97435~|~1~|~1~|~01/STR~|~Mill 2", pave 3" w/asphaltic concrete, minor pavement repair. 97435~|~1~|~2~|~02/ENH~|~100% local items 93781~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - District Preservation - 4MP7 (100% State) - Annual contract for placement of Spray Thermoplastic Striping within District 5 on IR; US; and SR 113805~|~1~|~1~|~01/NHS~|~Plan split for Federal/State funded work on NHS. 113805~|~1~|~2~|~02/S>2~|~Plan split for Federal/State funded work for STP. 111209~|~1~|~1~|~01/ENH~|~Continued extension of a shared use path connecting the Villages of Middleport to the Pomeroy River Walk. Along SR 833 0.33-0.64. Total length is 0.34 miles. Funded 95% Federal TAP (15% TRC)/5% Local. 111209~|~1~|~2~|~02/ENH~|~Adding a parking lot using Metro Parks Funds at 100% State. 94805~|~1~|~1~|~01/S<2~|~Shave and pave roadway, ADA intersection improvements. SLM 10.26 to SLM 10.66. 101716~|~1~|~1~|~01/NHS~|~Resurfacing with related work. 123563~|~1~|~1~|~01/SAE~|~Replacing R-W/R striping 114417~|~1~|~1~|~01/BRF/KENT~|~Rehabilitation of structure > 20' with superstructure replacement and abutment backwalls. 121940~|~1~|~1~|~01/S5K~|~city plan split. 106107~|~1~|~1~|~01/SAF~|~Work eligible for federal Highway Safety Improvement Program funding. 113480~|~1~|~1~|~01/MPO~|~NOACA Funded TLCI portion 113480~|~4~|~4~|~04/S<2~|~District-funded paving in Grafton 113480~|~1~|~3~|~03/S<2~|~100% Local items 113480~|~1~|~2~|~02/SAF~|~Safety items 96499~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2019. MOE 78 8.35-14.25, MOE 800 0.00-8.72 and MRG 60 0.00-5.65. Rural other federal aid funded 80 federal/20 state. 109467~|~1~|~1~|~01/IMS~|~Replace DMS signs on FRA IR 270 and IR 670 109467~|~1~|~2~|~02/NHS~|~Replace DMS signs on FRA US 23 and US 33 110374~|~1~|~1~|~01/MPO~|~Construction of pedestrian facilities on both sides of Kemp Road between both Grange Hall Road intersections. 102473~|~1~|~1~|~01/STR~|~Microsurfacing of CAR-644 and COL-644 93237~|~1~|~1~|~01/BRF~|~Removal and replacement of the existing Helena Street Bridge over the Great Miami River with a new bridge on Helena Street over the Great Miami River. SFN 5760437 108902~|~1~|~1~|~01/ENH~|~Construction of a shared use path connecting the Villages of Middleport and Pomeroy. Funded 95 federal/5 local. 105247~|~1~|~1~|~01/STR~|~Resurfacing JEF-151 123811~|~1~|~1~|~01/IMS~|~All work associated with the resurfacing of IR 71. 107701~|~1~|~2~|~02/S5K~|~Resurfacing work on SR 697 within the Delphos urban area from SLM 5.495 to 6.573. 107701~|~1~|~1~|~01/STR~|~Resurfacing on SR 116, SR 117, and a portion of SR 697 using district preservation funds (80% 4PF7 and 20% 4PS7). All within the Rural roadway classification. 83919~|~1~|~1~|~01/ENH~|~Extension of Marietta River Trail Bike/Ped path, approximately 0.97 miles beginning at Fourth Street and ending at Jefferson Street. Includes Enhancement, CMAQ and Local funds. 99862~|~1~|~1~|~01/STR~|~Replace bridge deck. Investigate semi-integral conversion. Paint steel superstructure and seal all concrete surfaces. 121618~|~1~|~1~|~01/S>2~|~Bike lane 98772~|~1~|~1~|~01/S<2~|~Winton Road: from Fleming Road to Sarbrook Drive. Rehabilitation of pavement; widening of pavement to provide left-turn lanes at several locations; rehab/repair and, as necessary, replacement of curbs, storm sewer system, and walks; traffic signal improvements. 98772~|~1~|~2~|~02/S<2~|~100% locally funded waterworks improvements being constructed in conjunction with this project. 123645~|~1~|~1~|~01/NFP~|~Plan split for pavement marking throughout the district 87347~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - CAP for CO & CE = $2,381,000.00 - Removal of approximately 1,200 feet of existing cut face; construction of steel wire mesh and erosion control items; improved rockfall catchment areas along the shoulders; incidental pavement and drainage items on GUE US40 14.29-14.48 82088~|~1~|~1~|~01/BRF~|~SFN 5060524 West Avenue Bridge over mahoning river 89832~|~1~|~1~|~01/NFP~|~Resurfacing / Mill and Fill 98015~|~1~|~1~|~01/NFA~|~Emergency Type B landslide repair. MOE 724 0.15. Not on any federal aid system. Funded 100% state. 113699~|~1~|~1~|~01/STR~|~MAR-47-2.45 to 2.95 88766~|~1~|~1~|~01/STR~|~Replacing existing structure SFN 7501080 SHE 65 0863 over the Muchinnippi Creek. 88766~|~1~|~2~|~02/STR~|~Rehabilitate pier piling encasements, rebuild deck edges using annodes, and reface abutments undin annodes on SFN 7501056 SHE 65 0757 over Jackson Center Ditch. 101833~|~1~|~1~|~01/STR~|~Loop Detector Repair 101833~|~1~|~2~|~02/SAF~|~LOR-20/58 Replace traffic signal cabinet, replace signal heads ERI-250/Kalahari pedestrian facilities & highway lighting 96296~|~1~|~1~|~01/ERD/BATH~|~Construction of an entrance sign, gravel drive, parking area, bike racks, visitor information kiosk, shelter, restroom, trail loop, picnic area. 117454~|~1~|~1~|~01/ENH~|~Funding to cover construction of bike trail 87182~|~1~|~1~|~01/STR~|~7306210 SCI SR776 0.19 Intersect: Stream80 Fed/20 state 01/STR/BR/State 110451~|~1~|~1~|~01/IMS~|~AC Overlay with repairs on: HAM-75 SLM 12.66 to 14.26 HAM-75 SLM 14.26 to 14.55 108770~|~1~|~1~|~01/NFA/BUCK~|~Buckeye Lake Municipal Bridge Funds - 5MP7 (80% Federal) / 4BG7 (15% TRC / 4BG7 (5% Local) - See CAP Comment - Replacement of bridges (SFN 4560002 & 4560003) carrying Commercial Drive over West Weir Run. 108770~|~1~|~2~|~02/ENH/BUCK~|~Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - Sidewalks and Drainage on 1) Lic-SR 79-03.64 to 04.10; 87418~|~1~|~1~|~01/ENH~|~Project consists of aesthetic improvements to the I-75/SR-123 interchange. These improvements include installation of trees, shrubs, grasses, and landscape bedding placed according to ODOT's highway landscaping guidelines. In addition, a gateway sign for the City of Franklin will be installed, designed in a manner compliant with ODOT regulations. 21478~|~1~|~3~|~03/NHS~|~"03/NHS/OT/ " - District Preservation Pavement Marking 4MP7(100% State) - No CAP - General System resurfacing on KNO SR13 20.80-23.10 21478~|~1~|~4~|~04/STR~|~"O4/STR/PV/ " - District Preservation Pavement Marking 4MP7(100% State) - No CAP - Pavement Marking for the Resurfacing on 1) KNO SR95 5.69-11.5; 2) KNO SR546 0-2.15 21478~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) KNO SR95 5.69-11.5; 2) KNO SR546 0-2.15 21478~|~1~|~1~|~01/NHS~|~"O1/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - General System resurfacing on KNO SR13 20.80-23.10 121596~|~1~|~1~|~01/NFA~|~Bridge Painting 91860~|~1~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replace single span slabs with concrete box culvert on 1) 3003574 GUE SR146 2.56 Intersect: Over Br Buffalo Fork #: BR Eligible: Length=20 SD/FO(1) SR=44.5 DSR=6; 2) 3003604 GUE SR146 3.42 Intersect: Over Br Buffalo Fork: Not BR Eligible: Length=22 SD/FO(1) SR=41.8 DSR=4; 91860~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replace single span slabs with concrete box culvert on 1) 3002349 GUE SR83 7.32 Intersect: Over Br Flat Run: Not BR Eligible: Length=13 SD/FO(1) SR=51.6 DSR=4; 95303~|~1~|~1~|~01/ENH~|~This project consists of constructing an extension of the Great Miami River Bikeway from Edwin C. Moses Blvd. (CR 621) to West River Road. 104804~|~1~|~2~|~02/ERD~|~Wendy Park Bridge Project 104804~|~1~|~3~|~03/ERD~|~Whiskey Island Connector Project 104804~|~1~|~1~|~01/ERD~|~Lakefront Canal Basin Links Project 104804~|~1~|~4~|~04/ERD~|~Redline Greenway Trail Projecto TIGER Grant eligible for Phase 1 & 2o MPO CMAQ eligible for Phase 1 & 2 104804~|~1~|~5~|~05/NFP~|~Wendy Park Bridge Project - Non-Eligible 122043~|~1~|~1~|~01/NHS~|~added plan split. 108336~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MOE 537 2.10. DSR MOE-017. Funded 100% federal. 110148~|~1~|~1~|~01/STR~|~Replace deficient bridge. 124414~|~1~|~1~|~01/IMS~|~Four lane resurfacing project using an asphalt overlay treatment. NOB 77 11.19-18.89. 92725~|~1~|~1~|~01/NFP~|~Consultant construction inspection 119968~|~1~|~1~|~01/MPO/BEAV~|~Plan split for MVRPC STP funded portion of project with 25% local match. 93135~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6001262 MUS US40 9.4 Intersect: Ramp D Over Timber Run; BR Eligible for Rehabilitation: Length=99 SD/FO(2) SR=66.6 DSR=5 109112~|~1~|~1~|~01/BRO~|~All work in this project is in this plan split. Funds are from the District Preservation Program budget 80% federal and 20% state funds. 87036~|~1~|~1~|~01/S>2~|~The project will improve the S-curve from McMicken Ave. to Dixmyth Ave. on West Martin Luther King Jr. Drive by improving the geometry, constructing the proper superelevation, and adding left turn lanes where needed. The project will increase turning capability at Dixmyth by making the existing left turn lane from EB MLK to Dixmyth longer. Bicycle accessibility will be improved with the inclusion of a bikeway. Pedestrian safety and accessibility will be improved by reconstructing pedestrian islands at Clifton Ave. and MLK. Turn lanes at Clifton and MLK will be added to increase capacity. Upgrades to signals will also be necessary. Sponsor - Cincinnati 109662~|~1~|~1~|~01/STR~|~Resurfacing JEF-152 89445~|~1~|~1~|~01/IMS~|~Lighting Maintenance 91725~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 690 0.75-0.79. Federal/State 80/20%. DSR ATH-014. 110939~|~1~|~1~|~01/IMS~|~Install a culvert lining. 91516~|~1~|~1~|~01/NHS~|~Marion urban pavingSR-95: 14.25-14.77, 16.11-16.94SR-95D: 0.01 - 0.89 91516~|~1~|~2~|~02/NHS~|~General system paving MAR-95-16.94 - 17.18 91516~|~1~|~3~|~03/NHS~|~Additional items not covered under Urban Paving such as pavement repair, curb, curb ramps, guardrail, signals, etc. to be funded with Marion's Large City funding. 101686~|~1~|~1~|~01/NFP~|~Fast dry pavement marking on various routes in District Six 96497~|~1~|~1~|~01/BRF/Zane~|~"01/BRF/BR/ZANE" - Replacement of deficient bridge w/in the City of Zanesville utilizing Municipa Bridge funds (4B87)approved for FY16 a for a federal max of $400,000 102021~|~1~|~1~|~01/S<2~|~Bridge overlay and other associated bridge items. 97245~|~1~|~1~|~01/IMS~|~Plan split for bridge replacement: 1808761 108771~|~1~|~1~|~01/BRF/PCEO~|~CEAO Federal/State Exchange Program - 4C87 (80% State Exchange) / 4BG7 (20% Local Match - CAP (See comments) - Replacement of Per-CR 26-03.65 SFN 6430929 Rush Creek Road over Little Rush Creek 124066~|~1~|~1~|~01/NHS~|~Emergency repairs to the concrete deck overlay. 119805~|~1~|~1~|~01/NHS~|~Improve the intersection of US 23 and Coover Rd (TR 194) 120392~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 124068~|~1~|~1~|~01/ENH/STPK~|~Replace bridge. 109412~|~1~|~1~|~01/NHS~|~Signal work 105839~|~1~|~1~|~01/IMS~|~All items of work associated with Spot Repairs on Interstate 270 and associated interchanges within the project limits. 103372~|~1~|~1~|~01/S>2~|~Concrete maintenance on Meridian Road between the I-680 interchange ramps. 119118~|~1~|~1~|~01/NHS~|~Culvert maintenance and storm sewer replacement. 91907~|~1~|~1~|~01/IMS~|~MRW-71 from 12.20 to 19.92 105308~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridges. 122157~|~1~|~1~|~01/NFP~|~Plan Split for MAP Grant funded project. Will be funded at 100% to account for credit given the LPA for funds already paid on prior phase of this project. 105478~|~1~|~3~|~03/IMS~|~Repair of WAR-63-0010 Collision damage to barrier and fence. 105478~|~1~|~1~|~01/IMS~|~Plan split associated with all work on Interstate Bridges HAM-75-1747, HAM-71-0320, HAM-75-0089 and HAM-471-0030R. This plan split includes the alternate bid for aesthetic fence as requested by the locals or a non-repetitive pattern on the concrete barrier-SFN: 3111261. 105478~|~1~|~2~|~02/NHS~|~This plan split is for all work associated with the following NHS bridges (BUT-27-0601, HAM-32-0127 and HAM-22-0622). 90193~|~1~|~1~|~01/NHS~|~Lighting Maintenance - LOR US 20/SR 301 - US 20/Grafton Road - LOR SR 10/SR 83C 90193~|~1~|~2~|~02/S<2~|~Lighting Maintenance - LOR US 20/SR 57 Interchange 123590~|~1~|~1~|~01/IMS~|~Plan split for Interstate. 94902~|~1~|~1~|~01/NHS~|~Culvert Replacement/Rehab 111620~|~1~|~1~|~01/NFP~|~Spot paving on various routes within POR, STA and SUM Counties. 114029~|~1~|~1~|~01/NFP~|~Reed Road over USR 30 was hit on Monday 9/14 by a lowboy carrying a piece of equipment on westbound USR 30. There is damage to three of the six beams on the bridge. 116164~|~1~|~1~|~01/BRF~|~Bridge replacement in Pike County. 124292~|~1~|~1~|~01/ENH~|~Primary plan split for TAP/Safety funded sidewalk scope 116142~|~1~|~1~|~01/NFA~|~Pump station rehabilitation 101364~|~1~|~1~|~01/IMS~|~This split is for Interstate bridges. 101364~|~1~|~2~|~02/NHS~|~This plan split is for NHS bridges 114083~|~1~|~1~|~01/SAE~|~Install new and upgrade existing pavement markings on various county roads. 119496~|~1~|~1~|~01/NFP~|~Landscape maintenance at various interchanges. 105372~|~1~|~1~|~01/BRO~|~Remove asphalt wearing surface, perform hydro-demolition, place new rigid concrete overlay. Upgrade railing, install VPF and repair expansion joints. 80955~|~1~|~1~|~01/ERD~|~Earmark funding (using TRC) for all work on this project. 102161~|~1~|~1~|~01/NFA~|~Replace structure over Squaw Creek in the City of Girard, Trumbull County, Ohio. 89141~|~1~|~1~|~01/NFA~|~Improve an existing drainage problem on Cookie Lane within the Timber Hill Reservable Area of Rentschler Forest Preserve by installation of concrete pavement with in an area of the lane that is subject to flooding. 106398~|~1~|~1~|~01/BRF~|~Plan Split 108791~|~1~|~1~|~01/S>2~|~Intersection Improvement 84475~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. These routes include: BUT-128 (from SLM 1.62-7.50), CLE-28 (from 9.09-12.94), CLE-222 (from SLM 19.41-24.17), CLI-73 (from SLM 2.32-6.24), and WAR-741 (from SLM 5.09-6.82 and 8.10-13.82) 84475~|~1~|~3~|~03/NHS~|~This Plan Split is for the NHS routes incldued in the project. These routes are: BUT -27, CLE-125, and CLI-73 (from SLM 0-2.32) 84475~|~1~|~2~|~02/S>2~|~This plan split is for the urban routes included in the project. These routes include: BUT-126, BUT-128 (from SLM 1.56-1.62), CLE-28 (from SLM 4.97-9.09), CLE-222 (from SLM 24.17-25), and WAR-741 (from SLM 5-5.09 and 6.82-8.10) 101573~|~1~|~1~|~01/NHS~|~DSR# JEF-009 119690~|~1~|~1~|~01/MPO~|~Plan split for roadway resurfacing. 119690~|~1~|~2~|~02/NFP~|~Plan Split for work items not eligible for federal reimbursement, 100% Local 119890~|~1~|~1~|~01/STR~|~Plan split for slide repair 101214~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split 1 created for the following STP Rural routes: MAD-29-10.61-13.01 MAD-38-0.00-12.39 MAD-41-0.00-3.85 MAD-207-1.13-1.39 MAD-323-0.00-0.28 101214~|~1~|~3~|~03/STR~|~CO CO Engr 01 plan split 1 created for the following STP Rural routes: MAD-29-10.61-13.01 MAD-38-0.00-12.39 MAD-41-0.00-3.85 MAD-207-1.13-1.39 MAD-323-0.00-0.28 101214~|~2~|~2~|~02/NHS~|~CO CO Contr 02 plan split 2 created for the following NHS routes: FAY-62-14.60-26.74 MAD-62-0.00-1.10/1.23-1.44 PIC-62-0.00-7.64 101214~|~2~|~4~|~04/NHS~|~CO CO Engr 02 plan split 2 created for the following NHS routes: FAY-62-14.60-26.74 MAD-62-0.00-1.10/1.23-2.39 PIC-62-0.00-7.64 97616~|~1~|~2~|~02/BRF~|~Replace PIC-CR-9 3.88 over Scippo Creek SFN 6533841 97616~|~1~|~1~|~01/BRF~|~Replace PIC CR 8 2.29 bridge over Slate Run SFN 6532160 121254~|~1~|~1~|~01/NFA~|~Created for J&C involvement 97437~|~1~|~1~|~01/SAE~|~Upgrade pavement markings on various county roads w/in Ashland County. 99817~|~1~|~1~|~01/NFP~|~Construction consultant engineering task order of D10 projects for FY2016. 109902~|~1~|~1~|~01/STR~|~Resurfacing of SR66 and SR 637 in Paulding County using 100% district capital allocations. 93658~|~1~|~1~|~01/SAE~|~Intersection improvements for bicycle and pedestrian safety at the intersections of SR-289 and Wood and Walnut streets. Funded totally with Safe Routes to Schools dollars. 87927~|~1~|~2~|~02/S<2~|~Systemmatic guide sign replacement; mainline and ramps on DAR US 36 11.50 to 13.08 (DAR US 127 from US 36 to Childrens Home Bradford Road), DAR 127 SLM 13.16 to 15.89, and LOS 540 SLM 1.28 to 1.84. 87927~|~1~|~4~|~04/IMS~|~Systemmatic guide sign replacement: MIA IR 75 SLM 3.74-3.76, and AUG IR 75 SLM 4.77-4.79 87927~|~1~|~3~|~03/STR~|~Systemmatic guide sign replacement; mainline and ramps on DAR 127 15.89 to 16.80; DAR US 36 9.61 to 11.50; DAR 121 SLM 18.83 to 18.93, LOG 117 SLM 6.64 to 7.09, LOG 292 SLM 0.00 to 0.50, LOG 347 SLM 0.32 to 0.57, and on MER SR 29 15.58 to 18.80. 87927~|~1~|~1~|~01/NHS~|~Systemmatic guide sign replacement; mainline and ramps on LOG US 33 SLM 9.78 to 29.69, LOG 68 SLM 9.41 to 9.69, and DAR 49 SLM 13.92 14.41. 104744~|~1~|~1~|~01/SAE~|~100% HSIP funding from the CEAO up to the cap. The amount over the cap will be provided by Putnam County. The County is not seeking cost recovery for Construction Engineering for LPA projects so all the federal funds will be used in the Construction Contract subphase. 101418~|~1~|~3~|~03/S<2~|~Minor bridge work > 20' span. 101418~|~1~|~4~|~04/S<2~|~Minor bridge work 10' to 20' span. 101418~|~1~|~1~|~01/S<2/ALLI~|~Resurfacing, urban paving in the City of Alliance. 101418~|~1~|~2~|~02/S<2~|~Resurfacing. 101418~|~1~|~5~|~05/S<2/ALLI~|~ADA curb ramp installation, full and partial depth repairs, manholes adjusted to grade and catch basin reconstruction. 101418~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 93975~|~1~|~2~|~02/NFP~|~This split is for all work items related to the new water and sanitary lines. 93975~|~1~|~1~|~01/S<2~|~This split is for all work items except new water and sanitary lines. 120090~|~1~|~1~|~01/SAF~|~Roundabout at Dimmick Rd and McCauly Rd 115526~|~1~|~1~|~01/SAE~|~Installation of cable barrier along US 33 median in D5 and D6. 100914~|~1~|~1~|~01/NHS~|~Microsurface US 33 in Auglaize County. AUG SR 33 SLM 6.60 to 15.16 118816~|~1~|~1~|~01/STR~|~All work included in this split. 123423~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 108147~|~1~|~1~|~01/SAF~|~Plans Split 108147~|~1~|~2~|~02/S<2~|~Split for 100% LPA funded Landscaping items 97164~|~1~|~1~|~01/NFP~|~Construction of a parking lot by the Ashtabula Metroparks. 98470~|~1~|~1~|~01/STR~|~LOR-58-0.00-8.42 Resurfacing 79975~|~1~|~1~|~01/NHS~|~PIK US23 from 0.00 - 5.25It is proposed on US23, to resurface the highway begining @ the Scioto Co. line then north for 5.25 miles and terminate just past the A Plant entrance ramps. Project includes the resurfacing of Interchange #074200 (4 ramps).80/20 79975~|~1~|~2~|~02/NHS~|~Brdgs for RehabBridges True Log Point Overall Length 6600123 PIK -US -23 3.950 240.0 6600077 PIK -US -23 0.000 92.3 6600182 PIK -US -23 4.700 198.0 6600093 PIK -US -23 3.950 255.0 6600158 PIK -US -23 4.700 198.0 6600115 PIK -US -23 0.000 16.0 6600042 PIK -US -23 0.000 92.3 121949~|~1~|~1~|~01/SAF~|~Install accessible pedestrian signals. 76425~|~1~|~2~|~02/NHS/NEWA~|~"02/NHS/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic SR 16 23.76 -24.27; Originally Urban Paving but new Classification maps and Urban Paving Guidelines changed the responsibility. 76425~|~1~|~6~|~06/NHS/NEWA~|~"06/NHS/OT/NEWA" - District Preservation 4PS7(100% State) - No CAP - Striping after resurfacing on Lic SR 16 23.76 -24.27; Originally Urban Paving striping but new Classification maps and Urban Paving Guidelines changed the responsibility. 76425~|~1~|~7~|~07/NHS~|~"07/NHS/OT/ " - District Preservation 4PS7(100% State) - No CAP - RAP Hauling from millings on 1)Lic SR 16 24.27-33.14; 2) Mus SR 16 00.00-00.33 76425~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1)Lic SR 16 24.27-33.14; 2) Mus SR 16 00.00-00.33 76425~|~1~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Bridge Rehabilitation on 4501411 LIC SR16 29.3 Intersect: Sr16 Ovr Rocky Fork Crk # Length = 145' SD/FO (1) SR=72.1 DSR=6. Bridge is BR Eligible 76425~|~1~|~4~|~04/NHS~|~"04/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Bridge repairs on 4501381 LIC SR16 29.3 Intersect: Sr16 Ovr Rocky Fork Crk # Length = 145' SD/FO (0) SR=94.3 DSR=7. Not BR Eligible 76425~|~1~|~5~|~05/NHS~|~"05/NHS/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Stiping and Raised Pavement Markers on 1)Lic SR 16 24.27-33.14; 2) Mus SR 16 00.00-00.33 116713~|~1~|~1~|~01/IMS~|~Interstate Plan Split 98339~|~1~|~1~|~01/STR~|~?01/STR/PV/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5. 98339~|~1~|~2~|~02/S<2~|~?02/S<2/PV/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Urban routes in District 5. 98339~|~1~|~3~|~03/NFA~|~?03/NFA/PV/ ? - District Preservation 4PS7 (100% State) - No CAP - Full Depth Repairs and Spot Paving on NOFAS-Rural routes in District 5. 98339~|~1~|~4~|~04/IMS~|~"04/IMS/PV/ " Plan Split for Pavement Repair work on Mus-70-10.19 to 13.22 98339~|~1~|~5~|~05/S>2~|~?05/S>2/PV/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Urban routes in Columbus Urban Area in District 5. 98339~|~1~|~6~|~06/IMS~|~"06/IMS/BR/ " - Plan Split for Bridge/App. work on Mus-70 Structures as part of spot paving work locations 105445~|~1~|~1~|~01/NFP~|~Funding Split 1 96654~|~1~|~2~|~02/IMS~|~Funding split associated with work performed ont he following bridges: PRE-320-0117/6803180, PRE-70-0504R/6800939, PRE-70-0504L/6800904, PRE-70-0689L/6800998, PRE-70-0689R/6801021, PRE-70-0872/6801080, PRE-127-1911/6802702, PRE-70-1072L/6801145, PRE-70-1072R/6801234, PRE-70-1249L/6801269, PRE-70-1249R/6801293, PRE-70-1349L/6801323, PRE-70-1349R/6801358, PRE-70-1366/6801382, PRE-503-1955/6803873, PRE-70-1500L/6801471, PRE-70-1500R/6801501, PRE-70-1541/6801536, PRE-70-1665/6801595, PRE-70-1766/6801625. Split includes approach roadway work for overhead structures. 96654~|~1~|~3~|~03/IMS~|~Plan Split for the work inside the rest areas 96654~|~2~|~4~|~04/STR~|~US 35 Major 2 Full Depth Repair SLM 1.95 to 2.62 96654~|~1~|~1~|~01/IMS~|~Plan Split for all the pavement within the project - both on mainline and ramps within the project limits. Also included resurfacing at the weigh station. Limits are on PRE-70 from SLM 0.00-17.67. 96654~|~1~|~5~|~05/STR~|~US 35: Resurfacing SLM 1.66 to 1.95 83988~|~1~|~2~|~02/IMS~|~Widen SFN 2513862 FRA-270-49.00, Alum Ck SB over I-270 83988~|~1~|~1~|~01/IMS~|~Construct new 270/Alum Creek Ramps - pvmt work 83988~|~1~|~3~|~03/IMS/OBZ~|~100% Obetz funding for bridge railing aesthetics 116897~|~1~|~1~|~01/S>2~|~Resurfacing 102874~|~1~|~2~|~02/S<2~|~STP < 200000 Resurfacing: 100% City 102874~|~1~|~3~|~03/S<2~|~STP < 200000 Bridge: 80/20 Fed/State Bridge 102874~|~1~|~4~|~04/S<2~|~Asphalt Concrete Surface Course using 50% Ontario Trap Rock ($43,0000 of safety funds approved for the Ontario Trap Rock). SR113 only. 102874~|~1~|~6~|~06/NHS~|~NHS Resurfacing LOR-57-20.59-20.88 100% Locale 102874~|~1~|~5~|~05/NHS~|~NHS Resurfacing LOR-57-20.59-20.88 80/20 Fed/Local 102874~|~1~|~1~|~01/S<2~|~STP < 200000 Resurfacing: LOR-113-11.66-12.74 80/20 Fed/Local. 107645~|~1~|~2~|~02/S<2~|~Resurfacing SR 39 from SLM 10.26 to 10.27, from 11.24 to 11.32 and from 11.37 to 11.72. These areas are entirely within the corporation limits of the City of Dover. 107645~|~1~|~4~|~04/S<2~|~100% City funding for non-resurfacing items in the City of New Philadelphia. 107645~|~1~|~1~|~01/S<2~|~Resurfacing SR 39 from SLM 10.24 to 10.26, from SLM 10.27 to 11.24, from SLM 11.32 to 11.37, from SLM 11.74 to 12.65, from SLM 13.15 to 13.29 and from SLM 13.39 to 13.47. This is all work outside of the corporation limits of Dover and New Philadelphia. 107645~|~1~|~3~|~03/S<2~|~Asphalt resurfacing of SR 39 in the City of New Philadelphia from SLM 12.65 to SLM 13.15, from SLM 13.29 to 13.39 and from SLM 13.47 to 13.55. 95558~|~1~|~1~|~01/IMS~|~Asphalt resurfacing of TUS-77 and pavement markings. 105275~|~1~|~1~|~01/STR~|~Resurfacing CAR-39 75460~|~1~|~1~|~01/STR~|~Brdg Replacement. 0.58 miles east of CR 59 (Hamilton Rd.) 0103152 ADA SR125 18.99 Intersect: Burr Creek80 Fed/20 State. 01/STR/BR/State 121326~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 110606~|~1~|~1~|~01/NFP~|~Split for work on the interstate system 122408~|~1~|~1~|~01/NFP~|~Crack sealing various routes in District 12 105288~|~1~|~1~|~01/S<2~|~Resurfacing COL-164 from Lisbon to SLM 16.87 105288~|~1~|~2~|~02/NFA~|~Resurfacing COL-164 from SLM 16.87 to SLM 18.00 120442~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 96720~|~1~|~1~|~01/NFP~|~Mowing 91043~|~1~|~1~|~01/BRF~|~80% federal / 20% local split using CEAO LBR funds to rehab the 152-foot long steel beam bridge. 116598~|~1~|~1~|~01/STR~|~Plan split for resurfacing on CLI-28 122817~|~1~|~1~|~01/MPO~|~80/20 split, 80% OKI CR funds (4CD7/KI08), 20% LNTP (using TRC) 101747~|~1~|~1~|~01/SAF~|~Installation of pavement solar road markers in districts 2, 11 and 12. 111026~|~1~|~1~|~01/SAF~|~Repair from Landslide along Columbia Parkway. 113052~|~1~|~1~|~01/S<2~|~Reconstruction of Davids Drive from SR 134 to approximately 1.2 miles east of SR 134. 118788~|~1~|~1~|~01/NFA~|~Chip seal installed by operation forces 99955~|~1~|~2~|~02/S<2~|~This funding split is for the traffic signal upgrade locations in Belmont County. 99955~|~1~|~1~|~01/STR~|~This funding split is for the traffic signal upgrade location in Columbiana County. 86765~|~1~|~1~|~01/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. Federal 80%/Local 20%. 86765~|~1~|~3~|~03/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. 80% Federal/20% Local (Ohio University). 86765~|~1~|~4~|~04/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. 100% Local (Ohio University). 86765~|~1~|~2~|~02/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. 100% Federal using Credit Bridge. 120336~|~1~|~1~|~01/STR~|~added plan split. 109075~|~1~|~1~|~01/S<2~|~Landslide repair project. MEG 124 22.04. Funded 100% state ER. 24999~|~1~|~2~|~02/IMS~|~Pavement markings and replacement of RPM's FR 1.73 MI N SIDNEY NCL TO .24 MI N JCT SR274. 24999~|~1~|~1~|~01/IMS~|~Minor rehab of existing pavement and other roadway related items on IR 75 from 1.73 mile North of Sidney north corporation limit to .24 miles north of junction of SR274. 24999~|~1~|~3~|~03/IMS~|~Deck patching, waterproofing Type D, deep joint sealing and Polymer modified asphalt expansion joint system on SFN 7501986 SHE 75 8.88 L & SFN 7502044 SHE 75 8.88 R; SFN 7502133 SHE 75 9.96 R and SFN 7502109 SHE 75 9.96 L; SFN 7502222 SHE 75 11.49 L and SFN 7502257 SHE 75 11.49 R; SFN 7502524 SHE 75 17.07 L and SFN 7502559 SHe 75 17.07 R, SFN 7502672 SHE 75 18.83 R and SFN 7502648 SHE 75 18.83 L 112896~|~1~|~1~|~01/S<2~|~MAR-4 from 13.82 to 17.21 and MAR-98 from 9.68 to 10.96 112896~|~1~|~2~|~02/STR~|~MAR-98 from 0.00 to 9.68 and 10.96 to 17.17. MAR-4 from 17.21 to 18.46 and 18.85 to 20.49. 93111~|~1~|~3~|~03/S<2~|~SFN 3904326 (HUR 547 str) 93111~|~1~|~1~|~01/STR~|~STP Rural Pavement: HUR-113-3.07-6.74 / ERI-113-0.00-6.05 93111~|~1~|~2~|~02/S<2~|~STP < 200000 Pavement: HUR-113-1.84-3.07 / HUR-547-7.13-8.18 107396~|~1~|~1~|~01/IMS~|~Block PID for FY 2024 Drainage Structures throughout District 4. 100205~|~1~|~1~|~01/IMS~|~Culvert repair under NOB 77 2.90. Emergency B. 94470~|~1~|~1~|~01/STR~|~Various routes district wide. 95446~|~1~|~1~|~01/SAF~|~Intersection improvements and signalization upgrade. MAH CR151 (South Avenue) from Matthews Road to Midlothian Boulevard. 103503~|~1~|~1~|~01/NHS~|~Repair existing superstructure of bridge (COL-30-3413, SFN 1502298) by heat straightening impacted girders and replacing bottom flanges and cross-frames as needed. 108467~|~1~|~1~|~01/MPO~|~Resurfacing of CR 17 from Norton N Corp to Minor Rd. 108467~|~2~|~2~|~02/MPO~|~Resurfacing of Cleveland-Massillon Rd (CR-17) from the Minor Rd to Ridgewood Rd (south intersection). 93653~|~1~|~2~|~02/S<2~|~Work on SR 18 from the Fostoria Urban Boundary at TR 262 at SLM 6.46 to the corporation limits of the City of Fostoria at 6.82. No local funds. Work is inside the Fostoria Urban Area but outside of the City of Fostoria. State and federal funds from the District Preservation Program budget. Urban STP funds. 93653~|~1~|~1~|~01/STR~|~All work outside of the Fostoria Urban Area. State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 109079~|~1~|~1~|~01/CMQ~|~Construction of a multi-modal transportation facility. 106280~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout District 4. 121844~|~1~|~1~|~01/MPO~|~Consruction of a portion of the Central Greenway Multi Use Path 104759~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in POR, STA and SUM Counties. 79221~|~1~|~2~|~02/ENH~|~New Construction. Begin @ intersection US23 and current east-west road between US23 & Second St, proceed NW intersecting w/SR104 & terminate @ SR220.Enhancement Plan Splits.CO CC PV TE = 80% TE 4B37 w/20% local match by Waverly01/ENH/PV/Waverly 79221~|~1~|~1~|~01/NHS~|~New Construction. Beginning at the intersection of US23 and current east-west road between US23 & Second St, proceed NW intersecting w/SR104 & terminate @ SR220. And being more fully described as follows: Construct a new segment of SR 220 roadway along the south west side of the City of Waverly within the City limits. This roadway will connect US23 south of the City, intersect with SR 104 and tie back into existing SR220 West of the City. The existing SR 220 on the west side of US 23 within the City Limits is to return to a city street. CO CC PV Smalley City = 80% Fed 4B97 Small City w/20% local match by WaverlyCO CC PV OH170 = 80% Fed 4R47 Earmark w/20% local match by WaverlyCO CC PV OH314 = 80% Fed 4R47 Earmark w/20% local match by WaverlyCO CC PV Local = 100% local match by Waverly01/NHS/PV/Waverly 80478~|~1~|~1~|~01/ERD/GCEO~|~"01/ERD/PV/GCEO" - SAFETEA-LU Earmark 4R47(80% Federal) / 4BG7(20% Local) - CAP of $728,000.00 federal for all phases - Access road from SR 209 into industrial park. 114431~|~1~|~1~|~01/STR~|~Culvert replacement. 103651~|~1~|~1~|~01/STR~|~Installation of a traffic signal at the intersection of IR 70 EB ramps and SR 149 in Belmont County 124788~|~1~|~1~|~01/SAF~|~Sign replacement 118905~|~1~|~1~|~01/S5K~|~Resurfacing US 62 from SR 45 to SLM 11.39, and from SLM 11.64 to SR 14T 118905~|~1~|~2~|~02/S5K~|~Resurfacing US 62 within the City of Salem, SLM 11.39 to SLM 11.64 118905~|~1~|~3~|~03/STR~|~Resurfacing SR 165 102885~|~1~|~1~|~01/IMS~|~Plan Split for the roadway portion of the project 97464~|~1~|~1~|~01/S>2~|~100% ORDC funding for queue cutter EB at CSX RR in Powell 91038~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO STP funds. 95427~|~1~|~1~|~01/NFA~|~Facilities Funds (LBP7) 91998~|~1~|~2~|~02/NFA~|~ADA 781 (2.08-2.12) 91998~|~1~|~1~|~01/STR~|~ADA 247 (17.12-18.17)ADA 781 (2.12-10.99) 91998~|~1~|~3~|~03/STR~|~ADA 781 2.17 0104604ADA 781 8.09 0104663 91998~|~1~|~4~|~04/STR~|~ADA 781 9.79 0104752 Under 20Ft. 87095~|~1~|~2~|~02/NFA~|~Resurfacing on the 100% State portion of GRE-370 within the project limits. The section is between SLM 0.0 to 1.21 87095~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of GRE-343 within the project limits. The section is between SLM 0.00 to 3.30 87095~|~1~|~3~|~03/STR~|~Railing repair on rural bridge. 92219~|~1~|~1~|~01/SAE~|~install pavement markings on various county roads in Fulton County 89717~|~1~|~1~|~01/SAE~|~A SRTS funded project to construct sidewalks at LUC CR71 5.35-5.36 LUC CR555 1.02-4.55, LUC CR556 0-1.92 111262~|~1~|~1~|~01/NHS~|~Type "A" terminal assembly replacements. 95772~|~1~|~1~|~01/STR~|~Resurfacing plan split for SEN-19, SEN-228 & SEN-590 123753~|~1~|~1~|~01/IMS~|~Interstate Plan Split 98987~|~1~|~1~|~01/NFA~|~ODNR JAC Cooper Hollow Wildlife Area 107691~|~1~|~1~|~01/NHS~|~Plan split for all work associated with the SEN-23-0742 bridge replacement 117367~|~1~|~1~|~01/NHS~|~Crack and seat work. 117367~|~2~|~2~|~02/STR~|~Slide repair work on US 127. Funded by the Geologic Site Management Program with overage funded by the District. 117367~|~2~|~3~|~03/NHS~|~Slide repair work on US 24. Funds by the Geologic Site Management Program with overage funded by the District. 105093~|~1~|~1~|~01/STR~|~01/STR/PV/ -Plan Split 1 107548~|~1~|~1~|~01/STR~|~Resurfacing TUS-212 97287~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2019 91041~|~1~|~1~|~01/MPO~|~Minor rehabilitation 101556~|~1~|~1~|~01/NHS~|~SFN 4800303 - Rehab cost split 101556~|~1~|~2~|~02/NHS~|~SFN 4800303 - Maintenance cost split 101556~|~1~|~4~|~04/NHS~|~CE Ongoing split 101556~|~1~|~3~|~03/NHS~|~Bridge lighting Plan Split 106206~|~1~|~1~|~01/IMS~|~FY 2020 Block PID for drainage system maintenance/repair. 107824~|~1~|~1~|~01/S<2~|~Part 1 - PIC-752-0.00 to 1.74 and PIC-752-1.92 to 2.32 107824~|~1~|~2~|~02/STR~|~Part 1 - PIC-752-2.32 to 8.43 107824~|~2~|~4~|~04/S<2~|~Part 2 -PIC-316-13.05 to 13.68 - State Funded Paving Work 107824~|~2~|~5~|~05/S<2~|~Items to be paid 100% by the Village of Ashville including OPWC funds 107824~|~1~|~3~|~03/STR~|~Bridge on PIC-752, SFN: 6503675 and 6503683 100954~|~1~|~2~|~02/STR~|~Replace existing polymer modified joint. 100954~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 5 from 26.00 to 30.95, TRU SR 87 from 0.00 to 2.26 and TRU SR 88 from 2.99 to 7.03. 87081~|~1~|~1~|~01/BRF~|~LOG CR 21 1.00 (SFN 4631838) Bridge replacementBuild new 2-lane structure adjacent to the historic truss. New structure will be on 55 mph curve alignment north of existing. Approximately 900' of roadway work will be required. Existing truss will remain in place as is. This structure is over the Great Miami River and there will be no work in the river. The historice truss will not be impacted by this project. 109958~|~1~|~1~|~01/SAF~|~CLI CR 12 4.43-4.93 realign both the horizontal and vertical curve as well as widen pavement and berms. 123551~|~1~|~1~|~01/NFP~|~CS 2031 107247~|~1~|~1~|~01/S>2~|~Minor bridge work. 96861~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail on various County Roads within Medina County. 96110~|~1~|~1~|~01/NFP~|~Wash Bay 107810~|~1~|~1~|~01/S<2~|~All work in the project. Work funded with funds from the Geologic Site Management (GSM) program. After the cap is reached funds will come from the District Preservation Program budget. No local funds. 107143~|~1~|~1~|~01/NHS~|~Slide/erosion repair along State Route 5 Westbound, Trumbull County, Ohio. 116674~|~1~|~1~|~01/SAF~|~TSG 89269~|~1~|~1~|~01/ENH~|~A multi-use path in a park in the Village of Whithouse. 82073~|~1~|~3~|~03/S>2~|~100% Local Columbus funding for pavement repairs and possibly new 5' paved shoulder, and curb ramps 82073~|~1~|~1~|~01/S>2~|~Federal/Local funding for urban paving portion of project in ColumbusSLM 15.42-19.87, 23.04-24.31 82073~|~1~|~2~|~02/S>2~|~Federal/State funding for areas outstide of ColumbusSLM 24.31-24.48 113710~|~1~|~1~|~01/MPO~|~Split for TLCI sidewalk work. 109527~|~1~|~1~|~01/SAF~|~purchase two LED countdown signs 95831~|~1~|~1~|~01/IMS~|~Reconstruction of the SUM - Central Interchange in the City of Akron, Summit County, Ohio. 116436~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 96295~|~1~|~1~|~01/SAF~|~Various intersection improvements on SR 2 in Lucas county from I-280/Dearborn to Isaac Drive 96295~|~1~|~2~|~02/SAF~|~plan split for 100% City items 114354~|~1~|~2~|~02/STR~|~Resurfacing various county roads. 114354~|~1~|~1~|~01/S5K~|~Resurfacing on various county roads. 86159~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 669 1585, SFN 5802253. Rural other federal funded 80 federal/20 state. 107554~|~1~|~1~|~01/STR~|~Herbicidal Spraying 105229~|~1~|~1~|~01/STR~|~Chip seal 105229~|~1~|~2~|~02/S<2~|~Chip seal 105229~|~1~|~3~|~03/NFA~|~Chip seal 121193~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the center line, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the Western MQS quadrants of the District. 122188~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-F 85253~|~2~|~2~|~02/BRO~|~6200036 OTT SR2 0.16 Intersect: Crane Creek 85253~|~1~|~1~|~01/NHS~|~Resurfacing LUC SR2 34.05-34.2 and OTT SR2 0-10.78 121659~|~1~|~1~|~01/IMS~|~replace deck 95165~|~1~|~1~|~01/STR~|~2015 ER Event OH15-01DSR# BEL-030Slide repair via drilled shaft retaining wall. 106437~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster SRTS Funds - 4SC7 (80% Federal) / 4BG7 (20% Local TRC) - See CAP Comments - Construction of sidewalks on east side of Sheridan Drive, beginning at East Fair Avenue and ending at Medill Elementary School - - Additive Alternate adds "Construction of sidewalks on east side of Sheridan Drive, beginning at Frederick Street to East Fair Avenue ." 101103~|~1~|~1~|~01/NHS~|~TBD 96701~|~1~|~1~|~01/NFA~|~STA Wilmot Shared 1,000 ton Salt Storage Building, demo existing timber shed. 110558~|~1~|~1~|~01/STR~|~LAW-243-10.81 Bridge Replacement. 119929~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT 111248~|~1~|~1~|~01/NFP~|~01/NFP/PV/ - Plan Split 1 86155~|~1~|~1~|~01/S<2~|~Culvert replacement project. MOE 536 0.96, SFN 5602858. Urban other federal aid 80/20 federal/state. 100890~|~1~|~1~|~01/NHS~|~SCI 52 10.50 (SFN 7300719) 88937~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 88937~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span. 88937~|~1~|~1~|~01/IMS~|~Resurfacing. 88780~|~1~|~1~|~01/STR~|~Project includes widening the northbound lane of Wayne Madison Road for approximately 0.5 miles. Widening will consist of a 12 foot lane, curb and gutter, an enclosed drainage system, and multi-use path on the widened side of the roadway. 124585~|~1~|~1~|~01/S5K~|~Roadway widening to improve horizontal and vertical alignment using 80% CEAO CSTP 4B77 funds up to federal maximum. 98269~|~1~|~1~|~01/CMQ~|~(CR 230) Installation of 6,550' fo bike path that would connect Wolfe Creek Trail near the intersection of Wolfe Creek Pike and NW Connector (SR 49) and the intersection of Olive Road and Modern Way in the City of Trotwood. The proposed path will utilize 2,415' of existing roadway shoulder along with 4,135' of new path. Also included is paving of the existing upaved bikeway from Olive Road, west to Vickwood Lane. 112585~|~1~|~1~|~01/ENH~|~Construct East Park hike and bike trail in Mill Creek Park. 117053~|~1~|~1~|~01/S>2~|~Split for bridge work 86958~|~1~|~1~|~01/STR~|~7403607 SEN SR587 3.69 Intersect: East Br Wolf Creek Branch 114505~|~1~|~1~|~01/S>2~|~Microsurfacing 114505~|~1~|~2~|~02/STR~|~Microsurfacing. 119279~|~1~|~1~|~01/S>2~|~Major Collector 119279~|~1~|~2~|~02/S>2~|~Minor Arterial 25491~|~1~|~1~|~01/NHS~|~HEN-24 from SLM 10.91 to SLM 19.47 116649~|~1~|~1~|~01/IMS~|~This plan split is for DD, pre-award 116649~|~1~|~2~|~02/IMS~|~Plan split represents all work related to roadway construction and engineering work in Ohio. 116649~|~1~|~3~|~03/IMS~|~Plan split represents all work related to bridge reconstruction construction and engineering work in Ohio. 116649~|~1~|~4~|~04/IMS~|~Plan split represents all work related to new bridge construction construction and engineering work in Ohio. 116649~|~1~|~5~|~05/IMS~|~Plan split represents all work related to roadway construction and engineering work in KY. 116649~|~1~|~6~|~06/IMS~|~Plan split represents all work related to bridge reconstruction construction and engineering work in KY. 116649~|~1~|~7~|~07/IMS~|~Plan split represents all work related to new bridge construction and engineering work in KY. 116649~|~1~|~8~|~08/IMS~|~Plan split represents all work related to bridge construction and engineering work for the new companion structure. This work is split 50/50 between OH and KY 116649~|~1~|~9~|~09/IMS~|~Plan split represents all work related to bridge rehab work construction and engineering work for the existing Brent Spence Bridge structure. This work is split 50/50 between OH and KY. 116649~|~1~|~10~|~10/IMS~|~This plan split represents six early work packages that can be funded through the RW Phase in Ohio consisting of 1) the Alta Fiber Utility Trench, 2) the demo and restoration of Longworth Hall, 3) the demo of the WXIX parking garage, 4) the demolition of ARTIMIS, 5) Longworth Hall tuckpointing and windows, and 6) relocation of the 36: GCWW Gest Street Water Main 116649~|~1~|~11~|~11/IMS~|~This plan split represents all of the early work packages in KY that can be funded through the RW phase, including: 1) SD-1 Existing Willow Run Combined Sewer Lining, 2) Goebel Park Ground Improvements, 3) Express Sewer and North Stormwater Trunkline - Downtown Segments, and 4) Kyles Lane Water Main Relocation 106298~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4. 88800~|~1~|~1~|~01/BRO~|~Replace deteriorated bridge with minimal approach work SFN 0603244 AUG SR 219 7.12 bridge over Schmier Ditch. 119209~|~1~|~1~|~01/STR~|~Reactive Pavement Maintenance. 124527~|~1~|~1~|~01/IMS~|~Replace structure 77333~|~1~|~1~|~01/NFA~|~Preliminary split to be used until funding is available. Currently this project uses the TRAC SAC. 121406~|~1~|~1~|~01/IMS~|~Plan Split to repair longitudinal joints on BUT+WAR-75 118770~|~1~|~1~|~01/S>2~|~Resurfacing. 123095~|~1~|~1~|~01/STR~|~Pavement marking project on various routes and sections in Athens County in FY25. CEAO funded. 99714~|~1~|~2~|~02/IMS~|~Heat straightening of damaged beams FRA-40-6.27 (2512270) 99714~|~1~|~1~|~01/NHS~|~For repair of damaged structure UNI-4-13.20 (8000093) 109306~|~1~|~1~|~01/SAF~|~Safety Improvements on CR 70 (Philothea Road) SLM 0.00 to 2.00 102598~|~1~|~1~|~01/IMS~|~Replace superstructures on TUS-77-2018 L & R (SFN 7902794, 7902824) and TUS-77-2089 L & R (SFN 7902883, 7902913). 102447~|~1~|~1~|~01/STR~|~Herbicidal Spraying for CAR, COL, HOL, and TUS 118536~|~1~|~1~|~01/STR~|~Bridge replacements. 107876~|~1~|~1~|~01/STR~|~On SR 12 in Hancock County from SLM 4.92 which is just east of west corporation limits of the Village of Benton Ridge to the Findlay Urban Area limits at CR 139 which is at SLM 10.19. District preservation funds. No local funds. 107876~|~1~|~2~|~02/S<2~|~On SR 12 in Hancock County from the Findlay Urban Area limits at CR 139 at SLM 10.19 to SLM 11.96 which is 0.13 mile east of Montana Avenue. District preservation program funds. No local funds. 107876~|~1~|~3~|~03/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds. 107876~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 88528~|~1~|~2~|~02/S>2/SCE~|~Resurfacing of Arlington Road from Killian Road to Krumroy, in Springfield Township, Summit County, Ohio. 88528~|~1~|~1~|~01/CMQ/SCE~|~Signals, NB turn lane at Warner Road, on Arlington Road from Killian Road to Krumroy Road in Springfield Township, Summit County, Ohio. 107550~|~1~|~1~|~01/STR~|~Resurfacing SR 416 from US 36 to SLM 3.78 107550~|~1~|~2~|~02/S<2~|~Resurfacing SR 416 from SLM 3.78 to 4.61 81637~|~1~|~2~|~02/IMS~|~See linked structures. 81637~|~1~|~1~|~01/IMS~|~Resurfacing MAH IR 76 from 0.00 to 3.08. 97042~|~1~|~3~|~03/STR~|~Pavement AC Overlay w/Rpr RIC SR 39 1.120 TO 1.580 RIC SR 96 0.000 TO 1.143 97042~|~1~|~1~|~01/NFA~|~Pavement AC Overlay w/Rpr: CRA SR 39 4.026 TO 7.613 RIC SR 39 0.000 TO 1.120 97042~|~1~|~2~|~02/S5K~|~Pavement AC Overlay w/Rpr RIC SR 39 1.580 TO 1.851 82953~|~2~|~1~|~01/S<2~|~100 % Local Funds (City of Lorain) Waterline 82953~|~1~|~2~|~02/S<2~|~Part 1 funded 80/20 NOACA / City of Lorain. Pavement/curbs/sidewalks from West 30th Street to West Erie Ave (US 6). 113252~|~1~|~1~|~01/STR~|~Replacement of MED SR 0301 05.48 culvert. 79671~|~1~|~1~|~01/IMS~|~Split for the entire project 94484~|~1~|~1~|~01/CMQ~|~Installation of fiber optic cable and interconnection of 130 signallized intersections in Cincinnati 101444~|~1~|~1~|~01/NHS~|~NHS Urban Paving - 80/20 Fed/City 101444~|~1~|~2~|~02/NHS~|~100% City of Huron Items 101444~|~1~|~3~|~03/STR~|~BRIDGE WORK TO DETERMINED LATER. 104352~|~1~|~1~|~01/STR~|~Split for paving work on the rural STP system from SLM 00.00 to 4.875 102939~|~1~|~1~|~01/STR~|~Major Rehab: CRA-602 Pavement 102939~|~1~|~2~|~02/STR~|~Bridges:CRA-SR-602 05.980 SFN 1703846 (OVER SANDUSKY RIVER)Minor Rehabilitation ? Slope repair & prot (082) Restore Rear Abutment Slope with RCP Type C  CRA-SR-602 09.490 SFN 1703870 (OVER BROKENSWORD CREEK) Preventive Maintenance ? Deck overlay(concrete) (040) Reactive Maintenance ? Exp jt repair/repl (048) Minor Rehabilitation ? Conc patching (non-deck) (010) ? Deck patching (conc) (049) ? Bridge railing upgrade/repair (061) ? Pile encasement (084) Replace deck edges, overlay deck, new bridge railing, patching approach slabs, pier pile encasement 119137~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 92400~|~1~|~1~|~01/NFP~|~Facilities Split 91246~|~1~|~1~|~01/NHS~|~repair slide at Woo-795 7.33 113790~|~1~|~1~|~01/NHS~|~Repair structure TUS-250-1232 R (SFN 7904835) by replacing the strip seal expansion joints throughout the bridge length. 105362~|~1~|~1~|~01/STR~|~AC overlay without repairs on:AUG-219 SLM 14.12 to 15.26 113753~|~1~|~1~|~01/SAF~|~Replace an Existing Span Wire Traffic Signal with a new Mast Arm Traffic Signal, add back plates, and radar detection. 113753~|~1~|~2~|~02/SAF~|~Items to be paid by the City. 83667~|~1~|~2~|~02/BRO~|~PIK SR104 10.64 - 11.36 Lake WhiteOn SR104 begin project at it junction w/SR551 and terminate at 0.84 mile south of Waverly Corp. limit (intersection of SR552). Project Description: On SR104, it is proposed to perform major rehab of the highway by reconstructing the highway surface in conjunction with the ODNR improvements to the Lake White Dam upgrades. Also the project includes replacing the existing bridge over Pee Pee Creek (also over Lake White Spillway) and improve the durability of the Lake White Dam by armoring the downstream face (Roller Compacted Concrete) to help protect the dam from impacts of flooding. This project is a ODOT/ODNR partnership for design, construction and construction inspection. 6601057 PIK SR104 11.23 Intersect: Pee Pee CreekCO CC 02 plan split for brdg eligible for BR funds. 100% state01/BRO/BR/State 83667~|~1~|~3~|~03/S<2~|~PIK SR104 10.64 - 11.36 Lake WhiteOn SR104 begin project at it junction w/SR551 and terminate at 0.84 mile south of Waverly Corp. limit (intersection of SR552). Project Description: On SR104, it is proposed to perform major rehab of the highway by reconstructing the highway surface in conjunction with the ODNR improvements to the Lake White Dam upgrades. Also the project includes replacing the existing bridge over Pee Pee Creek (also over Lake White Spillway) and improve the durability of the Lake White Dam by armoring the downstream face (Roller Compacted Concrete) to help protect the dam from impacts of flooding. This project is a ODOT/ODNR partnership for design, construction and construction inspection. CO CC 03 plan split for ODNRLocal match by ODNR.01/S<2/OT/ODNR 83667~|~1~|~1~|~01/S<2~|~PIK SR104 10.64 - 11.36 Lake WhiteOn SR104 begin project at it junction w/SR551 and terminate at 0.84 mile south of Waverly Corp. limit (intersection of SR552). Project Description: On SR104, it is proposed to perform major rehab of the highway by reconstructing the highway surface in conjunction with the ODNR improvements to the Lake White Dam upgrades. Also the project includes replacing the existing bridge over Pee Pee Creek (also over Lake White Spillway) and improve the durability of the Lake White Dam by armoring the downstream face (Roller Compacted Concrete) to help protect the dam from impacts of flooding. This project is a ODOT/ODNR partnership for design, construction and construction inspection. 100% state.01/S<2/PV/State 117545~|~1~|~1~|~01/SAF~|~Roundabout - 100% Safety 116151~|~1~|~1~|~01/IMS~|~Resurface existing pavement with fine graded polymer modified asphalt concrete. 115060~|~1~|~1~|~01/NHS~|~Split for channel work 114662~|~1~|~2~|~02/NHS~|~Plan Split for the bridge work associated to HAM-50-11.12 bridge over Rapid Run 114662~|~1~|~1~|~01/NHS~|~Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. 77825~|~1~|~1~|~01/NHS~|~Resurface SAN US6 15.06-18.45 77825~|~1~|~2~|~02/NHS~|~2 Bridges 77825~|~1~|~3~|~03/NFP~|~Plan split for 100% requested items 99885~|~1~|~1~|~01/SAF~|~Relocation of SR 104 124547~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement. 124682~|~1~|~1~|~01/SAF~|~Plan split for all TSMO ITS work on project 113000~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 116672~|~1~|~1~|~01/NHS~|~NHS Plan Split 116672~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split 116672~|~1~|~3~|~03/S5K~|~Marion Urban Area Plan split 116672~|~1~|~4~|~04/STR~|~STP Rural Plan Split 101052~|~1~|~1~|~01/STR~|~Chip seal various routes in Darke and Mercer Counties: DAR SR 726 SLM 0.00 to 4.00 = = DAR SR 49 SLM 32.03 to 35.96 = = DAR SR 118 SLM 8.58 to 12.42 = = DAR SR 118 SLM 16.61 to 17.67 = = MER SR 118 SLM 0.00 to 3.91 = = MER SR 219 SLM 14.01 to 17.67. 115095~|~1~|~1~|~01/NFP~|~Slide repair 108586~|~1~|~1~|~01/NFP~|~The City will extend Wells Road in their Ashland Business Park approximately 2,700' east of Ford Drive eventually intersecting with SR250. 107851~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-38-0.00-0.62, 0.90-1.04, 1.57-8.24 FAY-41-23.54-23.70 101756~|~1~|~1~|~01/NHS~|~Concrete pavement repair of SUM SR 8 from Graham Rd to just North of SR 303 88432~|~1~|~1~|~01/ENH~|~Install sidewalks and curb ramps on various village streets including segments of State Route 121 on the Northeast Connector, Harrison Street North, and on State Route 121 South and South Main Street. 123651~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. 107578~|~1~|~1~|~01/SAF~|~Installation of a single-lane roundabout at the intersection of SR-57 and Seville Rd. in the City of Wadsworth. 113918~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 113918~|~1~|~2~|~02/NFP~|~Created for J&C involvement. 91063~|~1~|~1~|~01/MPO~|~LAW Ironton Trails & Walkways It is proposed to construct a new Ironton Trails & Walkways Intermodal Project. Phase 1. Beginning @ the new Ironton Transit Center on S. 2nd St., proceeding west on existing streets, there will be 1000' of bike lanes and intersection improvement; passing through an existing floodwall opening & along the riverfront there will be 1300; of shared use trai constructed west along the floodwall alongside a proposed access road, thru a future economic development site (1100') then continuing west 2400' along the base of the exising floodwall to the existing N. 2nd St bridge over Storms Creek. Bike lanes will be constructed on the Storms Creek Brdg, continuing 100' along N. 2nd St, creating a connection to West Ironton. A trail spur along Storms Creek 725' in length will connect the proposed Ironton Marina & Rec Facility back to 2nd St and the new Trail system. 80% KYOVA 20% Local (Ironton) 01/MPO/OT/Ironton 94327~|~1~|~2~|~02/S5K~|~OTT-163 from SLM 22.316 to 23.99 94327~|~1~|~1~|~01/STR~|~OTT-163 from SLM 13.27 to 22.316 120329~|~1~|~1~|~01/S5K~|~ATH-EAST STATE STREET SIGNAL IMPROVEMENTS 88613~|~1~|~1~|~01/STR~|~Deck overlay (not Br eliglble):SFN 4900855, MAD-40-6.64R, Deer Ck 88613~|~1~|~2~|~02/BRO~|~Deck replacement (BR eligible):SFN 4900812, MAD-40-6.64, Deer Ck 103778~|~1~|~1~|~01/STR~|~Landslide repair. NOB 145 7.20. Work length approximately 100 ft. DSR NOB-009. 118985~|~1~|~1~|~01/STR~|~Resurfacing. 88407~|~1~|~2~|~02/SAF/ECSE~|~Items in the plans Erie County Sanitary is responsible for 88407~|~1~|~1~|~01/SAF/ERI~|~Improve Intersection / Turn Lanes / Sidewalks$1,000,000 commitment from Erie County / Turnpike Funds 88407~|~1~|~3~|~03/SAF~|~CE Ongoing services 88407~|~1~|~4~|~04/SAF~|~Ethernet radios and hardware for signal coordination of 13 intersections will be purchased and provided by ODOT for the Contractor to install. 81214~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Sealing of 1) 3002977 GUE IR77 9 Intersect: I-77 Over Csx Rr & Cr 431: Not BR Eligible: Length=267 SD/FO(0) SR=91.9 DSR=7; 2) 3002942 GUE IR77 8.88 Intersect: I-77 Over Csx Rr & Cr 431: Not BR Eligible: Length=267 SD/FO(0) SR=90.8 DSR=7; 3) 3003035 GUE IR77 9.14 Intersect: I-77 Over Leatherwood Ck: Not BR Eligible: Length=146 SD/FO(0) SR=91.9 DSR=7; 4) 3003000 GUE IR77 9.14 Intersect: I-77 Over Leatherwood Ck: Not BR Eligible: Length=146 SD/FO(0) SR=91.9 DSR=7; 5) 6003729 MUS IR70 27.04 Intersect: I-70 Over Sr 83: Not BR Eligible: Length=176 SD/FO(0) SR=91.0 DSR=6; 6) 6003753 MUS IR70 27.04 Intersect: I-70 Over Sr 83: Not BR Eligible: Length=176 SD/FO(0) SR=91.0 DSR=6; 81214~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge sealing of 1) 1600575 COS US36 29.88 Intersect: Evans Creek: Not BR Eligible: Length=122 SD/FO(0) SR=90.2 DSR=7; 2) 4500520 LIC SR13 22.39 Intersect: N. Fork Of Licking River: Not BR Eligible: Length=212 SD/FO(0) SR=95.5 DSR=7 81214~|~1~|~3~|~03/STR~|~"03/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge sealing of 1) 1601792 COS SR93 4.04 Intersect: Wills Creek #: Not BR Eligible: Length=390 SD/FO(0) SR=96.3 DSR=8 2) 3003647 GUE SR146 3.88 Intersect: 146 Over Abandoned Rr: Not BR Eligible: Length=158 SD/FO(0) SR=99.9 DSR=8 3) 4200152 KNO SR3 24.4 Intersect: Little Schenck CreekRr: Not BR Eligible: Length=74 SD/FO(0) SR=93.9 DSR=7 4) 3004325 GUE SR209 14.48 Intersect: 209 & 821 Over Wills Cr #: Not BR Eligible: Length=234 SD/FO(0) SR=97.6 DSR=7; 5) 6000843 MUS US22 22.78 Intersect: Over Georges Run & Csx Rr: Not BR Eligible: Length=271.9 SD/FO(0) SR=85.9 DSR=8; 81214~|~1~|~4~|~04/S<2~|~"04/S<2/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Sealing of 1) 6000495 MUS US22 11.59 Intersect: Muskingum River And Canal: Not BR Eligible: Length=709.2 SD/FO(0) SR=76.7 DSR=6; 2) 6001351 MUS US40 11.24 Intersect: Licking& Muskingum Rivers: Not BR Eligible: Length=953 SD/FO(0) SR=76.7 DSR=7; 3) 6006280 MUS SR555 11.34 Intersect: Over Muskingum River: Not BR Eligible: Length=543 SD/FO(0) SR=90.1 DSR=6; 107507~|~1~|~1~|~01/S<2~|~Resurfacing COL-45 from SLM 16.92 to 18.99 107507~|~1~|~2~|~02/STR~|~Resurfacing COL-45 from SLM 18.99 to 19.63 96877~|~1~|~1~|~01/NFP~|~This is the district's FY18 district wide lighting maintenance construction contract using 4CP7 sac code. 114577~|~1~|~1~|~01/NHS~|~Rockfall repair project. MEG 33 9.36. Work includes drape and trim blasting. 98566~|~1~|~1~|~01/BRF~|~Bridge replacement project. MOE CR16 3.36, SFN 5632358. 98503~|~1~|~2~|~02/S>2~|~Resurfacing TRU SR 169 6.44 to 6.77 98503~|~1~|~1~|~01/S>2/NILE~|~Resurfacing TRU SR 169 5.72 to 6.44 in the City of Niles. 118661~|~1~|~1~|~01/STR~|~WAS SR 60-15.79 200 ft landslide repair with drilled shafts. 102558~|~1~|~1~|~01/STR~|~CLI-73-1664 replace structure. 88762~|~1~|~1~|~01/STR~|~Replace deteriorating concrete deck. Include rehabilitation/replacement of bearings, backwalls and expansion joints on SFN 5504058 MIA SR 202 0849 (Lost Creek). 111399~|~1~|~1~|~01/S<2~|~Pomeroy Main Street emergency stream bank and shoreline protection project on MEG SR 833. 100% State funded through the MEG Co. TID. 105018~|~1~|~1~|~01/STR~|~plan split 92242~|~1~|~1~|~01/NFA~|~Wash water system for the COL/TUS county garages. 119617~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items 98761~|~1~|~1~|~01/S<2~|~Pavement marking on various county roads 100% 4B77 114537~|~1~|~1~|~01/BRO~|~Split for bridge rehab work 124900~|~1~|~1~|~01/MPO~|~MPO CRP funding 86453~|~1~|~1~|~01/IMS~|~Deck overlay - steel beam structure. Agler road over I-270. SFN 2512092 117000~|~1~|~1~|~01/MPO/LEB~|~Construction of a shared use trail on new alignment from Mound Street (south of Main Street), primarily along abandoned RR bed, to Monroe Street near the SR 48 Bypass. 23035~|~1~|~2~|~02/S>2~|~100% local funding for non-fed eligible work. 23035~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split using MPO STP funds. 91974~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7767870 Brandywine Drive Bridge over Brandywine Creek and SFN 7767862 Blackberry Drive Bridge over Brandywine Creek. City of Hudson, Summit County, Ohio. 88084~|~3~|~5~|~05/CMQ~|~Part 3 - Plan split for the CMAQ funds - Dorr St and McCord Rd Roundabout 88084~|~1~|~1~|~01/IMS~|~Part 1 - I-475 Pavement Plan Split 88084~|~1~|~2~|~02/IMS~|~Part 1 - I-475 Bridges plan split4807626 LUC IR475 6.48 Intersect: Cr 30-Hill Ave4807650 LUC IR475 6.48 Intersect: Cr 30-Hill Ave4807685 LUC IR475 7.53 Intersect: Cr 24-Dorr Street4807715 LUC IR475 7.53 Intersect: Cr 24-Dorr Street 88084~|~1~|~3~|~03/IMS~|~Part 1 - I-475 Noise wall Plan split 88084~|~2~|~4~|~04/IMS~|~Part 2 - New Interchange Plan split 88084~|~2~|~6~|~06/IMS~|~Plan split for 100% state paid incentive on Dorr St Interchange 88084~|~2~|~7~|~07/IMS~|~Plan split for 100% Local paid incentive on Dorr St Interchange 109597~|~1~|~1~|~01/BRO~|~Rehabilitation work on the Center Street Swing Bridge eligible for federal-aid 109597~|~1~|~2~|~02/NFP~|~Split 2 for quantities at 100% local cost 120068~|~1~|~1~|~01/NFA~|~NEVI Round 2 - 675-A 103520~|~1~|~1~|~01/NFA~|~Plan split 102671~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 8102287. 88376~|~1~|~1~|~01/BRO~|~Repair abutments on each mainline structure by patching and using galvanic anodes on SFN 5700965 MOT SR 4 20.92 L and SFN 5701023 MOT SR 4 20.92 R 98044~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 2.94 to 10.14 97307~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation 99042~|~1~|~1~|~01/SAF~|~Installation of a traffic signal and widening of the WB exit ramp to 2 lanes at the intersectopm pf tje WB OR 70 ramp and SR 149 114433~|~1~|~1~|~01/S<2~|~Culvert Replacement 104146~|~1~|~1~|~01/NFP~|~Guardrail 118478~|~1~|~1~|~01/MPO~|~Federally eligible items 92169~|~1~|~1~|~01/NFA~|~Adding a new access road and parking area in Eastlake MetroPark 100534~|~1~|~1~|~01/S<2~|~Resurfacing of COL-154 STP-urban section (SLM 2.27 to 5.63) 100534~|~1~|~2~|~02/STR~|~Resurfacing of COL-154 STP rural section from SLM 5.63 to 9.85. 113583~|~1~|~1~|~01/STR~|~Bridge replacement split 113583~|~1~|~2~|~02/STR~|~Plan split for work associated with conduit replacement 107985~|~1~|~1~|~01/NFP~|~Highway Lighting maintenance 88930~|~1~|~3~|~03/BRO~|~BR Eligible: SFN 7803052 3.98 US62 over Mud Run 88930~|~1~|~4~|~04/NHS~|~not BR Eligible: SFN 7803087 4.48 US62 over Mud Run 88930~|~1~|~2~|~02/NHS/HUBB~|~80/20 Resurfacing of US Route 62 from SLM 3.57 to SLM 4.56 in the City of Hubbard, Trumbull County, Ohio. 88930~|~1~|~1~|~01/S>2/HUBB~|~80/20 Resurfacing of US Route 62 from SLM 2.57 to SLM 3.57 in the City of Hubbard, Trumbull County, Ohio. 88930~|~1~|~6~|~06/NHS/HUBB~|~100% City Funded Items along US Route 62 from SLM 3.57 to SLM 4.56 in the City of Hubbard, Trumbull County, Ohio. 88930~|~1~|~5~|~05/S>2/HUBB~|~100% City Funded Items along US Route 62 from SLM 2.57 to 3.57 in the City of Hubbard, Trumbull County, Ohio. 76771~|~1~|~1~|~01/IMS~|~Placeholder plan split 96332~|~1~|~1~|~01/STR~|~It is proposed, on SR327 from the corp limit of Wellston (SLM 11.60) to the Vinton County Line (SLM 21.24), to resurface the highway with asphalt concrete. 114994~|~1~|~1~|~01/NFP~|~All work in this plan spit using 100% state funds SAC 4PS7. 84484~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2018 84484~|~1~|~2~|~02/NHS~|~Crack sealing on NHS route for 2018. 91988~|~1~|~1~|~01/STR~|~LAW SR93 Resurfacing projectRural Portion: 1.13 - 10.86On SR93, begin project @ its intersection w/US52, north for 10.86 miles and terminate 0.27 mile north of TR622. Pave Thru Brdgs:4401298 LAW SR93 2.47 Intersect: Hecla Branch4401336 LAW SR93 3.43 Intersect: Trib. Of Norris Branch4401360 LAW SR93 3.91 Intersect: Norris Br Of Storms Creek4401425 LAW SR93 7.18 Intersect: Ellisonville Creek80/20 split 91988~|~1~|~2~|~02/STR~|~LAW SR93 Brdgs F/Rehab:4401395 LAW SR93 4.1 Intersect: Storms Creek4401417 LAW SR93 6.37 Intersect: Trib Of Ellisonville Cr4401441 LAW SR93 7.76 Intersect: Etna Branch4401476 LAW SR93 8.66 Intersect: Cannon Creek4401514 LAW SR93 9.38 Intersect: Cranes Nest Creek4401549 LAW SR93 9.93 Intersect: Cranes Nest Creek80/20 split 91988~|~1~|~3~|~03/S<2~|~LAW SR93 Resurfacing projectUrban Poriton: 0.50 - 1.13On SR93, begin project @ its intersection w/US52, north for 10.86 miles and terminate 0.27 mile north of TR622. 118778~|~1~|~1~|~01/STR~|~added plan split. 90271~|~1~|~1~|~01/ENH/MPD~|~Construct multi-use path within the City of Medina by Medina County Metroparks, including bridges. NOACA money is capped at $832,512. Park District has agreed to pay any amount over that at 100% local. 105523~|~1~|~4~|~04/MPO~|~MORPC/Columbus funding for aesthetic enhancements on Front & High St bridge caps, also landscaping along Front and Fulton Streets 105523~|~2~|~10~|~10/ENH/Cols~|~MORPC/Columbus funded enhancements 105523~|~1~|~6~|~06/ENH/COL~|~Incremental items - Brick Paver Walk, Granite Curb and Lighting Items - Columbus to pay the difference above standard items 105523~|~2~|~12~|~12/NHS/INC~|~Incremental items - Brick Paver Walk, Granite Curb and Decorative Lighting Items - Columbus to pay the difference above standard items 105523~|~2~|~11~|~11/NHS/Cols~|~100% City of Columbus items. Rebuilding Second St from Mound St to Noble St. including brick paver sidewalks, lighting ,underground utilities, etc. 105523~|~1~|~1~|~01/NHS~|~IR 70 pavement reconstruction from SR 315 bto High St. Includes Fulton St and Front St. Also includes project eligible utility items: sanitary, water work, electrical, traffic surveillance 105523~|~1~|~2~|~02/NHS~|~"NH funding for construction of 7 new bridges:FRA-70-13.01A SFN 2510014 Ramp C5 over SR315FRA-71-15.18A SFN 2510013 Ramp A5 over Scioto RiverFRA-70-13.21A SFN 2510015 Ramp A5/B5/C5 over Scioto RiverFRA-70-13.57A SFN 2503749 Ramp C5 over Electrical VaultFRA-70-13.58A SFN 2510017 Ramp C5 over CXS & NS RRFRA-70-13.73A SFN 2510019 Ramp C5 over Short StFRA-70-13.90C SFN 2510021 Ramp C5 over 70/71" 105523~|~1~|~3~|~03/NHS~|~Structure replacement: FRA-70-13.73R New SFN 2510020 (existing SFN 2504537); I-70 EB over Short; Structure replacement FRA-70-13.95C New SFN 2510023 (existing SFN 2504561) S Front St over 70/71 (adding exit lanes):FRA-70-12.82R SFN 2504669 Ramp C5 over Souder Ave. 105523~|~2~|~8~|~08/NHS~|~IR 70 existing pavement reconstruction from railroad bridge to Front St., resurfacing and restriping IR 70 from Front St to Grant Ave, Ramp D7, and local streets (Mound, Short, Civic Center, Second) IR 70 widened pavement from railroad to Front St. and retaining walls. Also includes eligible utility items (waterworks, sanitary, electric, etc) 105523~|~2~|~9~|~09/NHS~|~Bridge replacement - FRA-71-1503L (I71 SB over railroads, Scioto River, and SR 315. Existing SFN 2504413 Rehabilitate IR 70 over Short St bridge by closing gap between bridges for MOT 105523~|~1~|~5~|~05/NHS/COL~|~100% City of Columbus funding for additional cost to put electric lines underground rather than leaving overhead. Includes Livingston Ave. Phase A (between Front St and High St intersections). 105523~|~1~|~7~|~07/NHS/AEP~|~AEP items to be done as part of the project to be paid 100% by AEP 108887~|~1~|~1~|~01/NFP~|~TID will construct the Firestone Business Park project 120918~|~1~|~1~|~01/SAF~|~Plan split for guardrail maintenance 109950~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 379 0.90. 110458~|~1~|~1~|~01/SAE~|~Construct a northbound right turn lane on SR-747 at SR-4. Remove the existing slip lane from northbound SR-747 to SR-4. Rebuild the existing signal. 87545~|~1~|~1~|~01/BRO~|~Replacing bridge on Division Street over Mahoning River 101980~|~1~|~1~|~01/STR~|~Landslide Repair, DSR# BEL-029 79789~|~1~|~1~|~01/IMS~|~90/10 District Allocation 79789~|~1~|~2~|~02/IMS~|~Bridge Work: MED-71-14.99 (R) 20344~|~2~|~2~|~02/NHS~|~Phase 2; New alignment of US-30 from Trump Avenue to State Route 44, in Canton Township and Osnaburg Township, Stark County, Ohio. 20344~|~1~|~1~|~01/NHS~|~Phase 1; Mine Remediation 20344~|~1~|~3~|~03/NHS~|~Construct new bridges on future US 30 alignment. 20344~|~1~|~4~|~04/NHS~|~Construct new culverts along future US 30 alignment. 123757~|~1~|~1~|~01/BRO~|~Bridge Maintenance 106134~|~1~|~1~|~01/NHS~|~Replace structure 10' to 20' span. 114444~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 101197~|~1~|~1~|~01/STR~|~Plan Split 1 created, contains US (non-NHS) and SR routes in Madison/Franklin Co. 99802~|~1~|~1~|~01/CMQ~|~Construct Roundabout eliminating 5 leg intersection were Western Reserve Road, North Lima Road and Springfield Road intersect. 110586~|~1~|~1~|~01/BRO~|~All the work for replace the bridges. District federal and state funds. 123894~|~1~|~1~|~01/CMQ~|~Reconstruction of the existing traffic signal at the intersection of Dayton-Xenia Road and North Fairfield Road and connection into the City of Beavercreek's fiber optic system. 116057~|~1~|~1~|~01/NFP~|~Plan split for RPM maintenance 100576~|~1~|~1~|~01/S<2~|~LAW 141 (0.88-0.91) 100576~|~1~|~2~|~02/STR~|~LAW 141 (0.91-16.37) 120257~|~1~|~1~|~01/S>2~|~Pedestrian improvement along Fairway Blvd 122109~|~1~|~1~|~01/NFA/PER~|~Perry County CEAO Federal/State Exchange Program Funding - 4B87 (80% Federal) / LNTP (20% Local Match) - Replacement of SFN 6434711 carrying over Little Monday Creek 119214~|~1~|~1~|~01/STR~|~All items of work associated with routes located within the STP Rural Area. 119214~|~1~|~2~|~02/S5K~|~All items of work associated with resurfacing of SR-41 within the Washington Courthouse Urban Area. 117097~|~1~|~1~|~01/ENH~|~TAP funding for all work associated with this project. Funding is 95% federal funds through the use of Toll Revenue Credit (TRC). The match and any funds over the cap to be provided by the City of Findlay. 94457~|~1~|~1~|~01/BRF~|~Replacement of 78' Steel Pony Truss Bridge SFN 3948315 located in Huron County, Greenwich Township on Omega Road (TR 145) 92413~|~1~|~1~|~01/NFA~|~Pavement repair, resurfacing with asphalt concrete at Deep Cut Park on State Route 66 nine miles North of St. Marys. 123502~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 101269~|~1~|~2~|~02/S>2/CANT~|~Resurfacing, urban paving in the city of Canton. Includes alt bid items for radar vs loop detectors. 101269~|~1~|~1~|~01/NHS/CANT~|~Resurfacing, urban paving in the City of Canton. Includes alt bid items for radar vs loop detectors. 101269~|~1~|~3~|~03/NHS/CANT~|~Full and partial depth repairs and ADA curb ramps. 100074~|~1~|~1~|~01/STR~|~Superstructure Replacement 110548~|~1~|~1~|~01/STR~|~FAY-41 from 24.45 to 29.05 and MAD-41 from 0.00 to 1.24, 1.96 to 3.85 111525~|~1~|~1~|~01/MPO~|~MPO Funded items 111525~|~1~|~2~|~02/NFP~|~Plan Split for scope items that are not Federally eligible, such as proprietary lighting. 113265~|~1~|~1~|~01/MPO~|~Split for MPO fund federal-aid eligible work. 113265~|~1~|~2~|~02/NFP~|~Plan split for non-eligible waterline work using 100% local funds. 89257~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 77526~|~1~|~1~|~01/IMS~|~Plan split for all eligible work on this project. 101362~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 555 23.76-26.73. Funded 100% State. 101362~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 37 0.00-8.22, MRG 669 0.00-2.64 and PER 669 12.43-13.27. Funded 80 Federal/20 State. 107349~|~1~|~1~|~01/NFP~|~D09 Mowing FY 2019 & 2020 121462~|~1~|~1~|~01/ERD~|~Major reconstruction of SR 39 in the City of East Liverpool utilizing MPDG Rural Grant Federal funds at 80% up to CAP. 106126~|~1~|~1~|~01/S>2~|~West Riverview bike path in the City of Dayton. 111095~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Replacement of the Deck and superstructure on SFN 3002675 90384~|~2~|~2~|~02/S>2/PICK~|~"02/S>2/OT/PICK" - Local Funds 4BG7 (100% Local) - No CAP - Water line work. 90384~|~1~|~1~|~01/S>2/PICK~|~"01/S>2/PV/PICK" - MORPC STP Funding 4TA7(80% Federal) / 4BG7(20% Local) - CAP of and $1,203,048.00 STP federal funding. - Realignment of Milnor and Meadows with site distance adjustments 96830~|~1~|~1~|~01/ENH/NEWC~|~"01/ENH/OT/NEWC" - Village of New Concord Transportation Alternative Project - 4B37 (Federal 80%) / 4BG7 (Local 20%) - CAP 4B37 of $218,304 - Installation of Decorative lighting, brick crosswalks and various accessories along US22/40 from east corporation limits to S Bridge Parking area. 109829~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements. 122961~|~1~|~1~|~01/MPO~|~Plan split for eligible road rehabilitation work. 122961~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 120638~|~1~|~1~|~01/NFA~|~Slope stabilization along SR 188 in Fairfield County. 108260~|~1~|~2~|~02/STR~|~Landslide repair from OH18-01 ER event. DDIR# JEF-006. 108260~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. DDIR# JEF-005. 95466~|~1~|~2~|~02/S>2~|~D6 funding to replace 8 culverts under SR-315 95466~|~1~|~1~|~01/S>2~|~Geotechnical funding (up to $3.0 M) and then D6 funding for slope stabilzation along Olentangy River 109665~|~1~|~1~|~01/NFP~|~Crack sealing various routes 108127~|~1~|~1~|~01/S>2~|~slide repair work eligible for federal/state GSM funds 93986~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities Funding 4MA7 (100% State) - No CAP - Construct a new salt dome 94525~|~1~|~1~|~01/IMS~|~Remove and replace mainline structures over Zenia RD. Structures will be widened to accomodate maintenance of traffic. SFN 1204327 CLA 70 1208 L and SFN 1204351 CLA 70 1208 R. 95244~|~1~|~1~|~01/SAF~|~Re-aligning Vandemark Road and installing a new traffic signal, re-aligning the intersection of Folkerth Avenue and Wayfarer Avenue and installing a new traffic signal, intersection access management at the intersection of SR 47 and Wilkinson Avenue and access management at the business drives. SLM 13.74 to 15.17. 107029~|~1~|~1~|~01/NFP~|~Districtwide Guardrail repairs. 106802~|~1~|~1~|~01/NFA~|~The Village will construct improvements to seven different intersections, access points and exit ramps that need widening, restriping, or reconstruction within the Village of North Randall 93143~|~1~|~1~|~01/S>2~|~Columbus urban paving of US-62, SLM 17.66-19.62 114971~|~1~|~1~|~01/STR~|~This split is for the rural section of the project. Funding is from the district preservation program using SACs 4PF7 (80%) and 4PS7 (20%). 90661~|~1~|~1~|~01/MPO~|~Resurface Crissey Rd LUC CR65 2.45-3.54 97986~|~1~|~1~|~01/STR~|~ADA SR 781 7.09 98120~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.00 to 7.78 106156~|~1~|~1~|~01/NHS~|~Plan Split 77530~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 118649~|~1~|~1~|~01/STR~|~Rehabilitation of GUE-541-03.72 carrying SR 541 over Wills Creek 123189~|~1~|~1~|~01/IMS~|~Plan split for work associated with pavement maintenance 110254~|~1~|~1~|~01/MPO~|~Resurface 3400? of Roadway, 310? of Roadway improvement and reconstruct existing traffic signal at E. David Rd. and Ackerman Blvd. 118609~|~1~|~1~|~01/NHS~|~added plan split. 116953~|~1~|~1~|~01/MPO~|~Resurfacing 112567~|~1~|~1~|~01/MPO~|~Baumhart Road rehabilitation using NOACA funds 122327~|~1~|~1~|~01/S>2~|~Plan split for deck replacement 106688~|~1~|~1~|~01/ENH~|~Construct 5 foot bike lanes on SR 416 101244~|~1~|~1~|~01/NFP~|~District Maintenance Funding 4CP7 (100% State) - No CAP - District Wide Contract for guardrail repair. 84401~|~1~|~1~|~01/NHS~|~80/20 federal/local split for all Urban Paving eligible work. 84401~|~1~|~2~|~02/NHS~|~100% local participation items of work such as curb ramps, etc. 116388~|~1~|~1~|~01/NHS~|~JEF-7 105418~|~1~|~1~|~01/IMS~|~Plan Split for bridges FRA-23D-4.41 and FRA-71-17.47 102681~|~1~|~1~|~01/NFA~|~Traffic signal improvements, a new pedestrian crossing on the north left of the intersection at Summit street and Madison Ave. Widen Jefferson Ave to provide one eastbound lane and two westbound lanes between Summit St and Water St. 98507~|~1~|~1~|~01/IMS~|~This funding event is for the sealing of all interstate bridges. 98507~|~1~|~2~|~02/NHS~|~Bridge sealing 110763~|~1~|~1~|~01/SAF~|~Resurfacing of Capel Rd 110763~|~1~|~2~|~02/NFA~|~Plan split for bridge rehabilitation at 100% Local Cost 105195~|~1~|~1~|~01/NHS~|~Plan Split for concrete pavement repair on GRE-444. 100840~|~1~|~1~|~01/NHS~|~BRO 62 8.38-11.76 98488~|~1~|~1~|~01/STR~|~STP Rural Pavement: RIC-546-0.00-8.37 98488~|~1~|~2~|~02/S<2~|~STP < 200000 Pavement: RIC-546-8.37-9.28 120197~|~1~|~1~|~01/NFA~|~Resurfacing project utilizing Local Roads Oil & Shale (State) funds at 100% up to project CAP. 118731~|~1~|~1~|~01/S>2/TRCE~|~Bridge rehabilitation. 90848~|~1~|~1~|~01/S>2~|~Roebling Suspension Bridge Pedestrian Connection: Provide ADA compliance by providing an accessible route on the upstream side of the Suspension Bridge between Covington and Ted Berry Way. Move the location of the existing stairs north of old Mehring Way. Construct sidewalk on the bridge from the termination of the old stairs to Ted Berry Way and the upper level of the Walnut Street Stairs and fountain. Reconstruct the stairs into Lot 12 and Mehring Way. *ADA route to utilize elevator to be constructed under a separate contract.; Ohio River Trail: Construct portion of the ORT between Broadway and Elm Street.; Broadway Pedestrian Connection: Remove and replace the existing stairs from the intersection of Broadway and Pete Rose Way to the existing elevated pedestrian walkway. 90848~|~2~|~2~|~02/NFA~|~Any 100% Local items 97318~|~1~|~1~|~01/STR~|~SCI CR VAR GR FY19 110037~|~1~|~1~|~01/S<2~|~Paving in BG Urbanized area Woo 25 11.92 to 13.64 110037~|~1~|~2~|~02/STR~|~Paving in Rural area for SR 25 13.64 to 15.89 110037~|~2~|~3~|~03/STR~|~Retro Fuel Price Adjustment 94292~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation Bridge Funds 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on SFN 4202104 KNO US 62 14.28 over the Kokosing River. Not BR Eligible for rehabilitation Length = 327; SD/FO = 0; SR = 83.6; and DSR=5: 116205~|~1~|~2~|~02/NHS~|~Plan split for resurfacing work on SR-795 from SLM 2.129 to 2.26 116205~|~1~|~3~|~03/S>2~|~Plan split for resurfacing on SR-795 from SLM 1.76 to 2.129 116205~|~1~|~1~|~01/BRO~|~Plan split for work on WOO-795-0227 bridge 110473~|~1~|~1~|~01/NHS~|~Signal upgrade at US 23 (11.43) & SR 348. 107703~|~1~|~1~|~01/STR~|~Resurfacing on SR 500 using district preservation funds (80% 4PF7 and 20% 4PS7). 93318~|~1~|~1~|~01/IMS~|~Replace deficient bridge deck with minimal approach transitions. Structure part of I 75/US 35 interchange. Project to remove structural and functional deficiencies on SFN 5707404 MOT 75 1164E on Albany Street Ramp (IR 75 North - US 35 East). 117419~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 100940~|~1~|~1~|~01/STR~|~Ac Overlay on rural route: MER SR 118 SLM 15.20 to 17.97 100940~|~1~|~2~|~02/S<2~|~AC Overlay on sm urban route: MER SR 118 SLM 14.42 to 15.20 100940~|~1~|~3~|~03/SAF~|~Add center line rumble strips as Safety measure. 89248~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 89248~|~1~|~4~|~04/NFP~|~Split for 100% local items 89248~|~1~|~3~|~03/MPO~|~Split for TLCI work 89248~|~1~|~2~|~02/SAF~|~road diet on Lorain Ave from West 117th to West 65th which includes resurfacing, turn lanes, adding back plates, and reconstructing signals that is eligible for federal-aid 99701~|~1~|~1~|~01/NFP~|~Spot paving of various routes in Ashtabula, Mahoning, and Trumbull counties. 92230~|~1~|~1~|~01/NFP~|~state funding for work on 6 structures2102498 DEL IR71 13.07 Intersect: Under C34 North Galena Rd2102552 DEL IR71 15.63 Intersect: Under Kilbourne Rd.Cr655901448 MRW IR71 10.57 Intersect: Under (Card-Chesterville)2103540 DEL SR521 9.93 Intersect: Over I-715900964 MRW IR71 0.4 Intersect: Under W. Lib-Mt.Vern Rd5902703 MRW SR229 5.5 Intersect: Over I-71 92230~|~1~|~2~|~02/IMS~|~Replacement of Arrow board damaged by motorist. 114742~|~1~|~1~|~01/STR~|~PIK Chipseal. 110489~|~1~|~1~|~01/NFP~|~Sign replacements on various routes throughout District 4. 110489~|~1~|~2~|~02/NFP~|~Replacing a sign truss on TRU 80 3.32. 100188~|~1~|~1~|~01/CMQ~|~Construction of the Great Miami River Trail from the current terminus of SR-73 to the Butler/Warren County Line. Split covers the project work within the City of Middletown. 100188~|~1~|~2~|~02/CMQ~|~Construction of a 10' wide multi-use trail adjacent to SR-73 from the Butler County line to the existing GMR trailhead at Baxter Drive, north of SR-73. Split covers the work within the City of Franklin. 110111~|~1~|~1~|~01/IMS~|~Rehabilitate bridge HAM-75-1642R that carries Northbound I-75 over Kemper Road by replacing the concrete overlay, Expansion joints, and correcting the approach roadway profile. Bridge: SFN 3111075 122179~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-70/77-A 107018~|~1~|~1~|~01/BRF~|~Bridge replacement. 107018~|~1~|~2~|~02/NFA/HUDS~|~Drainage work leading to and away from new structure not eligible for muni bridge funds. 101622~|~1~|~1~|~01/IMS~|~Resurfacing and related work. 96306~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7(100% State) - No CAP - Bridge rehabilitation on 4506219 LIC-SR 657-9.77 Intersect: Over Lake Fork Licking River; Not BR Eligible: Length=119 SD/FO(0) SR=78.5 DSR=6 103426~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7 109115~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. WAS 7 9.45 L (SFN 8401470) and R (SFN 8401500), WAS 7 9.60 (SFN 8400067), WAS 7 9.78 L (SFN 8400091) and R (SFN 8400121). 109115~|~1~|~2~|~02/BRO~|~Creating split for materials purchase 110220~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 553 0.70. 100% State ER funded. 92839~|~1~|~1~|~01/NFP~|~Culvert replacements along various routes throughout Trumbull County, Ohio. 120618~|~1~|~1~|~01/IMS~|~Work to replace guardrail and construct barrier 94900~|~1~|~1~|~01/NHS~|~Culvert Replacement/Rehab 94367~|~1~|~1~|~01/IMS~|~90% fed/10% state funding split utilizing noise wall replacement program funding. 107213~|~1~|~1~|~01/ENH~|~Install new sidewalks near Girard High School. 99904~|~1~|~1~|~01/NFA~|~Replacement of two pedestrian bridges: (1) Glencross Avenue over Two Mile Creek and (2) one in Howard F. Wilson Park over Shaffer Creek. In addition, stabilize stream banks and replace approach sidewalk to meet ADA regulations. 106403~|~1~|~1~|~01/NFP~|~District Maintenance/Preservation Project - 4CP7/4PS7 (100% State) -District wide Ash Tree removal project 112848~|~1~|~1~|~01/BRF~|~Bridge replacement > 20' span. 87705~|~1~|~1~|~01/S<2~|~District Allocation - 80/20 92080~|~1~|~1~|~01/BRO~|~6631428 PIK CR50 0.62 Intersect: Carrs Run 6630308 PIK CR50 0.51 Intersect: Carrs Run CEAO 80 Fed/20 Local match Pike County 01/BRO/BR/Pike 92080~|~1~|~2~|~02/BRO~|~SFN 6630308 has to be replaced due to the federally eligible bridge being replaced, in association with the realignment. This is why credit bridge is being used on both. 108273~|~1~|~1~|~01/S>2~|~Milling and overlaying 1,960' of asphalt roadway to achieve a proper cross slope for drainage along the roadway and new pavement markings in the City of Brookville. 122232~|~1~|~1~|~01/NFA~|~NEVI Round 2B 13-A 124891~|~1~|~1~|~01/S5K~|~All work included in this plan split. 94490~|~1~|~3~|~03/BRO~|~80/20 fed/state funding split using BR funds for all work on the following structures: 1811525, 1811762 94490~|~1~|~2~|~02/STR~|~80/20 fed/state funding split using STP funds for work on the US-322 structure: 2801477 94490~|~1~|~1~|~01/IMS~|~90/10 funding split for bridge work on the following structures: 1804502, 1805673, 1813897, 1813935, 4303938, 4303903 108217~|~1~|~1~|~01/NFP~|~Mowing at various locations in Franklin County 101754~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan Split 1 for KNO-661-0.00 to 6.10, LIC-661-1.79 to 14.81 101754~|~1~|~2~|~02/S5K~|~"02/S5K/PV/ " - Plan Split 2 for KNO-661-6.10 to 6.46 101754~|~1~|~3~|~03/S5K/MTVR~|~Plan Split 03/S5K/PV/MTVR for KNO-661-6.46 to 7.41 101754~|~1~|~4~|~04/S50~|~Plan Split 04/S50/PV/ - for LIC-661-0.00 to 1.79 95106~|~1~|~2~|~02/MPO~|~80% federal / 20% local participation split using MPOT Enhancement funds to streetscape a portion of Cedar Road from WCL to Fairmount Blvd. 95106~|~1~|~1~|~01/MPO~|~80% federal / 20% local participation split using MPO STP funds to resurface Cedar Road. 100214~|~1~|~1~|~01/NHS~|~Emergency Job LAW 52 11.53 Rock Remediation 112697~|~1~|~1~|~01/NFP~|~Reconstruction of the POR-IR 76 Rest Area parking lots. 114290~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8. 114290~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. 24941~|~1~|~1~|~01/IMS~|~Bridge repair by cleaning and painting steel beam bridges using system OZEU and for BEL-70-2000, SFN 072722, by replacing bearings, repairing expansion joints and repairing substructure. 124358~|~1~|~1~|~01/SAE~|~RCUT 122299~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 120401~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established 82404~|~1~|~1~|~01/S>2~|~Winchester Pike & Bixby/Brice intersection improvement project. Local Sponsor - FRA County Engineer 95311~|~1~|~1~|~01/NFA~|~Reconstructing a 4 mile stretch of City owned Northwest Industrial Lead rail track including 4 at grade crossings. 121168~|~1~|~1~|~01/S50~|~Replace culvert. 107571~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2024. 100% State funded. 99079~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 4 lanes - MIA/SHE/AUG/MER/DAR 116265~|~1~|~1~|~01/NFA~|~Funding C227 SAC 116265~|~1~|~2~|~02/MPO~|~Funding for the design consultant on-going services 101391~|~1~|~1~|~01/STR~|~Bridge 107546~|~1~|~1~|~01/STR~|~Resurfacing CAR-43 102238~|~1~|~1~|~01/SAF~|~Work to reduce the congestion along IR-71 91431~|~1~|~1~|~01/STR~|~Pave culvert invert. MRG 37 4.60 (SFN 5800102). Rural other federal aid funded 80 federal/20 state. 91431~|~1~|~2~|~02/NHS~|~Pave culvert inverts. MOE 7 15.07 (SFN 5600510) and WAS 7 40.80 (SFN 8400466). Work also includes fill and plug existing 20?x16? box culvert on WAS 7 40.84 (SFN 8400458). NHS routes funded 80 federal/20 state. 102403~|~1~|~1~|~01/STR~|~Resurfacing US 22 from GUE Co. Line to SLM 15.25 (begin 4-lane). 95464~|~1~|~1~|~01/NHS~|~Major Rehabilitation - 5MT7(80% Federal) / 4MT7(20% State) and 4PF7 (80% Federal) / 4PS7 (20% State) - See CAP Comments - Resurfacing on 1) Cos-SR 16-00.82 to 8.99 95464~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 97359~|~1~|~1~|~01/NFP~|~Mowing 98686~|~1~|~1~|~01/NFA~|~Libbey Rd 96333~|~1~|~1~|~01/S<2~|~Urban Area is 0.00-1.71 96333~|~1~|~2~|~02/STR~|~Rural Area is 1.71-4.48 91546~|~1~|~1~|~01/NHS~|~Remove and replace existing reinforced concrete deck on bridge (BEL-7-2361, SFN 0700770) with new reinforced concrete deck. Repair substructure units as needed and provide new approach slab. 111249~|~1~|~1~|~01/NFP~|~01/NFP/PV/ - Plan Split 1 99071~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on US 33 on 4 Lane and 2 Lane in Logan County. 102041~|~1~|~1~|~01/NFA~|~The City is constructing a full depth reclamation of Meridian Road. The project will include the reconstruction of curb and gutter that allows for the roadway to be widened from 11 to 12 feet. Reconstruct 1.2 miles of Meridian from I-680 south to Mahoning 93210~|~1~|~1~|~01/SAF~|~Improve the safety at the interection by adding a westbound left turn lane, realigning the eastbound left turn lane and changing the traffic signal timing movements and include an extension of the existing bike trail to the east within the work limits and relocation of the sidewalk in the area of the added turn lane at East Central Avenue, East Dixie Drive, Cedar Street, and Slonaker Avenue intersection. 93527~|~1~|~1~|~01/NFA~|~4BW2 funding for metro park purchase order 124438~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 102522~|~1~|~2~|~02/NHS~|~Culvert LinerADA 32 10.32BRO 32 4.49 102522~|~1~|~1~|~01/STR~|~HIG 753 3.62 90574~|~1~|~1~|~01/NFP~|~This is a barrier sweeping contract using maintenance operating funds. 116633~|~1~|~1~|~01/STR~|~Plan Split for Chip Seals 112257~|~1~|~1~|~01/IMS~|~Plan split for Concrete Repairs on IR 670 121190~|~1~|~1~|~01/STR~|~Upgrade Highway Lighting 109598~|~1~|~1~|~01/SAF~|~Plans split for Safety funded items 108134~|~1~|~1~|~01/MPO~|~Resurfacing of East Waterloo Rd from Glenmount Ave to Kelly Ave in the City of Akron. 91838~|~1~|~1~|~01/STR~|~General System Resurfacing on CAR-43 and CAR-183 including asphalt overlay, pavement repairs and pavement markings. 119160~|~1~|~1~|~01/IMS~|~All work included in this split. 87277~|~1~|~1~|~01/NFA~|~general system - minor rehab. on HOL-515-0.00 to 5.51: structural overlay of 2 1/4 in. of asphalt, pavement repairs and pavement marking 97554~|~1~|~1~|~01/BRF~|~SFN 4735102, Ohio Bridge Partnership Program, Foley Road over Plum Creek 102623~|~1~|~1~|~01/BRO~|~4800451 103122~|~1~|~1~|~01/NFP~|~Replace School Flasher Signs, UPS Cabinet and Signal Cabinet. 103122~|~1~|~2~|~02/NFP~|~Replace UPS Batteries, Relamp Signal Heads & Signal Head Replacement w/Backplates. 107570~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 107570~|~1~|~2~|~02/NHS~|~Resurfacing US 250 107780~|~1~|~2~|~02/STR~|~General System Split (Rural): DEL-745-4.00-7.03 107780~|~1~|~1~|~01/S<2~|~General System Plan Split (Columbus Urban Area): DEL-745: 0.85-4.00. Also includes minor repair work on structure DEL 745 232 (2104156) 101366~|~1~|~1~|~01/STR~|~Bridge replacement project ATH 691 5.17. Federal Aid route, 80% Federal/20% State. 113024~|~1~|~1~|~01/STR~|~All work is in this split. Funding is 80% federal PROTECT funds with a 20% state match from district preservation funds. 104774~|~1~|~1~|~01/NFP~|~District wide Barrier Reflector replacement. 118592~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 91552~|~1~|~1~|~01/STR~|~Deck replacement. Located 0.26 miles South of Pike County Line on SR 1047303211 SCI SR104 17.37 Intersect: Camp Creek80 Fed/20 State. 01/STR/BR/State 100993~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. MRG 376 10.00-19.45. Not on any federal aid system funded 100% state. 100993~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MRG 376 0.00-9.73. Rural other federal aid funded 80 federal/20 state. 114154~|~1~|~1~|~01/NFA~|~Minor repairs and resurfacing 1/2 of parking lot 97598~|~1~|~1~|~01/S<2~|~Herbicidal spraying along various roadsides in D07 115819~|~1~|~1~|~01/SAF~|~Safety project on CR49. 111020~|~1~|~1~|~01/SAF~|~Safety funded plan split 111020~|~2~|~2~|~02/S<2~|~West State St resurfacing from SR 53 to Christy Rd 111020~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 107262~|~1~|~1~|~01/IMS~|~CO Noise Wall Program - 5BV7 (90% Federal) / 4BV7 (10% State) - No CAP - Construct Type II Noise wall: Lic-IR 70-01.90 to 02.14; 122858~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing around Cooper Arena/Voinovich Building/O'Neil Building/Viaduct, Crack seal and pavement markings on Black and Gold Blvd. 122858~|~1~|~2~|~02/NFA~|~Pavement repair and resurfacing of the main entrance parking lot at the History Connection. 119918~|~1~|~1~|~01/BRO~|~Increase resiliency of bridges carrying US 22 over Cross Creek and TR 166 by protecting pier w/use of rock channel protection. Work along TR 166 will be completed as being incidental to the construction of the rock channel protection. 102802~|~1~|~4~|~04/STR~|~STP rural bridges 102802~|~1~|~1~|~01/NHS~|~SR-108 from SLM 8.01 to 13.39 NHS Pavements 102802~|~1~|~3~|~03/S<2~|~SR108 from 6.77 to 7.05 Pavement in the Wauseon urbanized area 102802~|~1~|~2~|~02/STR~|~SR108 from 7.05 to 8.01 and SR-109 from 14.90 to 18.00 STP rural pavements 106766~|~1~|~1~|~01/ENH~|~TLCI Work 106766~|~1~|~2~|~02/ENH~|~100% LPA 93521~|~1~|~2~|~02/STR~|~02/STR/BR/ ; ALL-75/103-16.32/0.30, SFN 203572; 80% Fed (4PF7) - 20% State (4PS7) 93521~|~1~|~1~|~01/IMS~|~01/IMS/BR/ ; ALL-75/103-16.32/0.30; SFN 204447 and SFN 0203548; 90% Fed SAC 4PF7 - 10% State SAC 4PS7 101406~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split 1 for the following STP Rural routes: DEL-4-0.00-1.98 DEL-47-0.00-1.07 MAR-4-13.00-20.49 MAR-37-3.31-8.45 MAR-95-0.00-0.45/4.48-13.10 MAR-203-.043-1.19/3.24-7.74 MAR-231-0.00-4.32 MAR-739-0.00-8.14 UNI-4-14.07-26.25 UNI-37-0.00-2.20/5.49-9.14 UNI-739-22.93-25.81 101406~|~2~|~2~|~02/NHS~|~CO CO Contr 02 plan split 2 created for the following NHS Routes: MAR-309-0.00-15.35 101406~|~1~|~3~|~03/STR~|~CO CO Engr 01 plan split 1 created for the following STP Rural routes: DEL-0.00-1.98 DEL-47-0.00-1.07 MAR-4-0.00-1.69/13.00-20.49 MAR-37-3.31-8.45 MAR-95-0.00-0.45/4.48-13.10 MAR-203-0.43-1.19/3.24-7.74 MAR-231-0.00-4.32 MAR-309-0.00-15.35 MAR-739-0.00-8.14 UNI-4-14.07-26.25 UNI-37-0.00-2.20/5.49-9.14 UNI-739-22.93-25.81 101406~|~2~|~4~|~04/NHS~|~CO CO Engr 02 plan split 2 created for the following NHS routes: MAR-309-0.00-15.35 106829~|~1~|~1~|~01/SAF~|~100% Local 116728~|~1~|~1~|~01/STR~|~Resurfacing. 116728~|~1~|~2~|~02/S>2~|~Resurfacing. 98991~|~1~|~1~|~01/S>2~|~Wheeling St 94517~|~1~|~1~|~01/STR~|~It is proposed to replace SFN 7306172 on SR728, 1.53 and add guardrail.80 Fed/20 State01/STR/BR/State 93067~|~1~|~1~|~01/IMS~|~90/10 funding split for all work on this project. 112255~|~1~|~1~|~01/STR~|~General plan split. Will add specific splits when locations are determined. 112712~|~1~|~1~|~01/IMS~|~Epoxy overlays of FRA-670-1.08 (mainline and 2 ramps) & FRA-270-24.86 112371~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of SFN 4505700 structure. 109495~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 145 0.38 (SFN 6101747) and NOB 147 18.42 (SFN 6103219). Rural other federal aid. 94664~|~1~|~1~|~01/SAE~|~Project involves upgrading the existing pavement markings on various county routes in Butler County 93428~|~1~|~1~|~01/NHS~|~Priority System preventive maintenance on JEF-7-10.83 to 14.78; includes asphalt mill and fill; minimal repairs and pavement marking 91721~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 218 0.00-3.84. Not on any federal aid system funded 100% state. 91721~|~1~|~2~|~02/STR~|~Two-lane resurfacing projece using an asphalt overlay treatment. GAL 233 0.00-7.88. Rural other federal aid funded 80 federal/20 state. 88608~|~1~|~1~|~01/STR~|~Concrete deck overlay over Bell-Harraman Ditch SFN 5101530 - MAR 309-10.87 83203~|~1~|~1~|~01/SAF~|~Improve geometrics 83203~|~1~|~2~|~02/SAF~|~Jobs and Commerce (4JC7) funding for change order work to improve turning radii for truck traffic. 110416~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - No CAP - intersection improvement at LIC-40 and LIC-37. 110416~|~2~|~4~|~04/STR~|~03/STR/BR " - No Cap - District Preservation 80% Federal (4PF7) and 20% State (4PS7) - deck sealing on LIC-40-12.33 and LIC-40-12.61 110416~|~1~|~2~|~02/SAF~|~"02/SAF/CV/ " - No Cap - 90% Federal (4HJ7) and 10% State (4BC7) - replacement of culvert at LIC-40-13.281 (CFN 1799740) 110416~|~2~|~3~|~03/STR~|~"02/STR/PV/ " - No CAP - 80% federal/20% state - resurfacing from SLM 9.27 to SLM 13.15. 110416~|~3~|~5~|~05/STR/HEBR~|~Installation of water line within project area. Work to be paid by village of Hebron. 113018~|~1~|~1~|~01/NFP~|~All work on SR 294 from SR 37 (0.00) to the west corp limit of Harpster (8.94) using district preservation allocations. The project is on a Rural Minor Collector and therefore needs to use 100% state funds. 102538~|~1~|~1~|~01/NHS~|~Replace decks on two bridges TUS 250 1504 L & R (SFNs 7904959 & 7904983). Replace approach slabs. 118618~|~1~|~1~|~01/SAE/PCEO~|~Replacement of pavement markings along various county routes in Perry County 122816~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAD 4CD7). Construction phase cap is $998,238.00 and requires a 20% match (TRC) 124177~|~1~|~1~|~01/BRO~|~Bridge exchange funding split. 112910~|~1~|~1~|~01/STR~|~JAC 279 0.00-11.45 112910~|~1~|~2~|~02/STR~|~Bridge maintenance. 112910~|~1~|~3~|~03/NFP~|~Retroactive fuel price adjustment 101211~|~1~|~1~|~01/NHS~|~SR 108 Resurfacing Urban from SLM 17.66 to SLM 18.72. 101211~|~1~|~2~|~02/STR~|~Resurface SR 108 STP Rural portion (Federal eligible, non-NHS) from SLM 18.72 to SLM 22.72 and SR-66 in Fulton County. 116887~|~1~|~1~|~01/NHS~|~Overlay with repairs. 111589~|~1~|~1~|~01/S>2~|~Replacement of the superstructure with prestressed concrete box beams with composite concrete deck. Also, minor substructure modifications/repairs, as well as related roadway adjustments and restoration. 92861~|~1~|~1~|~01/SAE~|~Pavement marking 96071~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " Plan Split for construction of a new Salt Storage Building at the proposed Quaker OP in Knox COunty. 123527~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 99520~|~1~|~1~|~01/ENH~|~Purchase of bike kiosks and bicycles for installation at various locations within the City of Cincinnati. Installations will expand the City of Cincinnati's existing bike share system. 98038~|~1~|~1~|~01/NFP~|~Split 124939~|~1~|~1~|~01/S>2~|~Plan split for resurfacing Other Federal Aid Urban roadway 120669~|~1~|~1~|~01/SAF~|~Plan split for all work on project 106198~|~1~|~1~|~01/NFP~|~D04 FY 2021 culvert repair/replacements. 104117~|~1~|~4~|~04/S<2~|~Urban Paving 80%Fed/20%State CRA-4-10.23 to 10.65 Right Side of Pavement 104117~|~1~|~3~|~03/S<2~|~Urban Paving 100%City CRA-4-9.31 to 9.52 Full City Corp CRA-4-10.23 to 10.65 City Corp on the Left CRA-4-10.65 to 10.87 Full City Corp 104117~|~1~|~2~|~02/S<2~|~Urban Paving 80%Fed/20%CityCRA-4-9.31 to 9.52 Full City CorpCRA-4-10.23 to 10.65 City Corp on the LeftCRA-4-10.65 to 10.87 Full City Corp 104117~|~1~|~1~|~01/S<2~|~Mill & fill, sidewalk & curb repair/replacement (SLM 9.52 to 10.23) using Small City Federal Funds and Toll Revenue Credit. Railroad is within this section. 123705~|~1~|~1~|~01/STR~|~All Work is within this split 115312~|~1~|~1~|~01/SAF~|~Split for recessed wet-reflective pavement markings 94476~|~1~|~1~|~01/IMS~|~To structurally pave the inverts of small culverts HAM-275-1954 and HAM-275-2487. 94079~|~1~|~2~|~02/STR~|~Bridge Maintenance on SFN 0402338 ATB SR 45 8.46 over Branch of Grand River and SFN 0402354 ATB SR 45 over Rock Creek 94079~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 45 1.87 to 11.06 112972~|~1~|~3~|~03/STR~|~For costs associated with WAR-350 and CLE-749 112972~|~1~|~2~|~02/NHS~|~Repair bridge wingwall and retaining wall issues including the MSE wall west of the HAM-126-1501 R bridge at the EB exit ramp to US 42. 112972~|~1~|~1~|~01/IMS~|~Repair bridge wingwall and retaining wall issues including the MSE wall at the HAM-75-0722 railroad bridge over I-75. 93075~|~1~|~1~|~01/SAF~|~Safety Work. All work in this split. 100% state funds. $72,000 in SAC 4BC7 funds from the Safety program. The remainder of the funds are SAC 4PS7 funds from the District Preservation Program funds. The District will be responisible for any overage. 102493~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Crack sealing on various routes in D05 in FY 2022 90536~|~1~|~1~|~01/S>2~|~Pavement Markings:CR 41 5.58 - 7.12CR 57 1.61 - 2.71 90536~|~1~|~2~|~02/NFA~|~Pavement Markings:CR 3 0.00 - 3.22CR 9 1.83 - 6.26CR 30 0.00 - 5.81CR 41 3.33 - 5.58CR 49 0.00 - 2.46CR 57 0.00 - 1.61 80140~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement 116032~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - 99562~|~1~|~1~|~01/NFA~|~Maintenance of the trai network throughout the City. Items may include: Signs, pavement repair, pavement markings and fencing. 99598~|~1~|~1~|~01/NFP~|~District 11 guardrail reconstruction and repair. 99598~|~1~|~3~|~03/NFA~|~Guardrail replacement on SR 524 in the Village of Bergholz. 99598~|~1~|~4~|~04/S<2~|~Guardrail replacement along SR 152 in the Village of Empire. 99598~|~1~|~2~|~02/STR~|~Guardrail replacement within village corporation limits of Bergholz (SR 164 only) and Mt. Pleasant funded by BHJ. 102001~|~1~|~1~|~01/NFP~|~District 4 one year mowing contract along interstate and interstate look-a-likes in Ashtabula, Mahoning and Trumbull Counties. 90273~|~1~|~1~|~01/NHS~|~Reconfigure the US 35/Woodman interchange to a Tight Urban Diamond (TUDI). Project will also install sidewalk along Woodman Dr. 90273~|~1~|~2~|~02/NHS~|~Replace bridge decks. 90273~|~1~|~3~|~03/NHS~|~Decorative lighting to be paid by the City of Riverside. 90273~|~1~|~4~|~04/NHS~|~Guardrail repair 104132~|~1~|~1~|~01/BRO~|~Split for work on the Whitehouse Crossing structure 95662~|~1~|~1~|~01/NHS~|~Signals located at Wilmington Pike and I-675 NB and SB ramps.This is covered by D7. 95662~|~1~|~2~|~02/S>2~|~Signal located at Wilmington Pike and SR 725.This is covered by D8. 95662~|~1~|~3~|~03/CMQ~|~CR 85 Wilmington Pike SLM 0.00 to 1.55 the project will provide upgraded communication between 11 traffic signals and will also rebuild or upgrade equipment at the individula intersections as needed to improve safety and operations. There are 9 locations in the City of Centerville. 97034~|~1~|~1~|~01/STR~|~Microsurfacing on State Routes 212 and 516 in Tuscarawas County. 116477~|~1~|~1~|~01/STR~|~Chip Seal in Jackson County. 112693~|~1~|~2~|~02/NFP~|~100% Local Items beyond 1.5" Pavement. 112693~|~1~|~1~|~01/NHS~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items): Limited to the top 1.5" of Pavement. 112499~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 105302~|~1~|~1~|~01/NHS~|~Resurfacing and concrete repairs on JEF-22 from the HAS Co. Line to SLM 6.98 116671~|~1~|~1~|~01/STR~|~This split is for the portion of US68 that is outside the Kenton Urban area. 116671~|~1~|~2~|~02/S5K~|~Resurfacing inside the Kenton Urban Area but outside of the City of Kenton. District Preservation Program funds. No local funds. 121052~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 10.90. 116572~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 83217~|~1~|~1~|~01/CMQ~|~MORPC CMAQ project Intersection improvement project of DEL-CR124/Home Road with SR-257 and with S Section Line RoadLocal sponsor - DEL County Engineer 117934~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-G 159-162 85600~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds. 108132~|~1~|~1~|~01/MPO~|~Resurfacing of S Hawkings St from East Ave to Mull Ave in the City of Akron. 99674~|~1~|~1~|~01/STR~|~This plan split is for the rural portion of the route. 99674~|~1~|~2~|~02/S<2~|~This plan split is for the large urban portion of the route. 99674~|~1~|~3~|~03/S>2~|~This plan split is for the small urban portion of the route. 122292~|~1~|~1~|~01/IMS~|~Plan Split for the steel repairs to bridges 92158~|~1~|~1~|~01/BRF~|~4860969 LUC M0889 NO DATAIntersect: NORFOLK SOUTHERN RR 92158~|~1~|~2~|~02/NFA~|~100% City or ATAT conduit items 123019~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4. 88611~|~1~|~1~|~01/BRO~|~Deck replacement (BR eligible):SFN 2508850, FRA-104-9.69, Groveport Rd 119489~|~1~|~1~|~01/BRO~|~Plan split for CEAO LBR fund eligible work to replace the bridge SFN 4345908. 95458~|~1~|~2~|~02/S<2~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Fai-US 22- 18.05 to 18.67 95458~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1). Fai- US 22- 18.67 to 26.07 2). Per-US 22-0.00 to 6.77 3). Per-SR 13- 26.88 to 28.15 121986~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 89155~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge Project 123771~|~1~|~1~|~01/BRO~|~Bridge Replacement 102849~|~1~|~1~|~01/NFA~|~BRO 221 Scour Project.BRO 221 3.90 (SFN 0802883)BRO 221 5.72 (SFN 0802948)BRO 221 5.88 (SFN 0802972) 99070~|~1~|~1~|~01/S>2~|~Apply herbicides along roadside for week control on 4 lane roads - MOT/CLA IR 70/75/675 - US 40/68 - SR 4 110591~|~1~|~1~|~01/STR~|~AC Overlay with repairs 110591~|~1~|~2~|~02/NFA~|~AC Overlay with repairs 115128~|~1~|~1~|~01/STR~|~Landslide repair(s) by drilled shaft retaining walls. 98783~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR74 E1.77, SFN 5832152. Includes minor approach work. Funded 100% federal (with 20% TRC) through the OBPP. 93989~|~1~|~1~|~01/BRF~|~Johnson Road Covered Bridge On Johnson Road, TR291, approximately 1 mile north of the Scioto County line, the Johnson Road Covered Bridge carries Johnson Road over the Brushy Fork of the Little Scioto River near Petersburg in southwestern Scioto Township. Built in 1870, it is listed on the National Register of Historic Places. It is proposed to rehabilitate & repair structural components, replace deteriorated timber members, & install fire protection to keep bridge in good repair and to allow it to continue to carry vehicular traffic. 80% FHWA Discretionary Grant Program20% local match01/BRF/BR/Jackson County 96722~|~1~|~1~|~01/NFA~|~Trumbull Gustavus Outpost, build new 40'x200' (8,000 sq ft) pole building with 10 bay cold storage 91921~|~1~|~1~|~01/S>2~|~Rehabilitate Bridge GRE-835-0207 (SFN 2904519) by placing a rigid overlay, replacing the deck edges, installing abutment supports, and perfroming other minor rehabilitation items. 110076~|~1~|~1~|~01/STR~|~Replace/repair culverts on rural routes. 110076~|~1~|~2~|~02/NHS~|~Repair/replace culvert on NHS route. 100326~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint. 95962~|~1~|~1~|~01/NFP~|~New 60' x 150' fabric salt building at 6000 tons. Demolish one dome. 95962~|~1~|~2~|~02/NFP~|~Build new 5000 square feet equipment storage building. Demolish lean-to. 86942~|~1~|~1~|~01/STR~|~Rural Plan Split for ATB SR 45 24.10 to 26.43 86942~|~1~|~2~|~02/STR~|~Bridge Plan Split for SFN 0402680 ATB SR 45 25.15 over Red Brook and SFN 0402710 ATB SR 45 25.30 over West Branch of Red Brook 113794~|~1~|~1~|~01/BRF~|~"01/BRF/BR/KCEO" - replacement of structure KNO TR 124 0.10, SFN 4236459 using federal/state exchange program. 123115~|~1~|~1~|~01/NHS~|~Resurfacing US 33 82797~|~1~|~1~|~01/CMQ~|~80/20 fed/local funding split for all work using MPO CMAQ funds. 82797~|~1~|~2~|~02/CMQ~|~100% local participation for work items that are not federal-aid eligible. 87039~|~1~|~1~|~01/IMS~|~Systematic sign upgrades on Interstate Route. 87039~|~1~|~2~|~02/NHS~|~Systematic sign upgrade on NHS route. 87039~|~1~|~3~|~03/STR~|~Systematic sign upgrade on Rural Routes 87039~|~1~|~4~|~04/S>2~|~Systematic sign upgrade on urban routes. 105294~|~1~|~1~|~01/IMS~|~Resurfacing of IR-77 115992~|~1~|~1~|~01/STR~|~Plan split for slope repair 106455~|~1~|~1~|~01/NFP~|~Construction engineering and testing tasks not attributable to a specific PID 91905~|~1~|~1~|~01/IMS~|~Crack sealing at various locations on DEL IR 71 and MRW IR 71 104420~|~1~|~1~|~01/NFP~|~Old Sandusky garage clean up 95108~|~1~|~1~|~01/CMQ~|~80% federal / 20% local participation using MPO CMAQ funds for the upgrading/replacement of the signals along Lorain Avenue in the City of North Olmsted. 95108~|~1~|~2~|~02/NFP~|~100% local participation especially fro work items not eligible for federal funding 108715~|~1~|~1~|~01/STR~|~Drainage repair, ER Event# OH18-01, DDIR# BEL-010 105924~|~1~|~1~|~01/SAF/LCEO~|~Licking County Engineer HSIP Funding - 4HB7 (100% Federal) - See CAP Comment - Project to renew striping on various county roads in Licking County. 97891~|~1~|~1~|~01/SAF~|~100% for replacement of a faild culvert (Emergency Request Type A) 102764~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes 95582~|~1~|~1~|~01/STR~|~Bridge Rehabilitation - WAY-241-06.88 (SFN 8504652)Minor Rehabilitation?Approach slab repl/repair (100)?Approach railing repair (102)New Construction?Structure(repl) (002)?Structure widening (005) 116299~|~1~|~1~|~01/STR~|~Overlay project. 115694~|~1~|~1~|~01/STR~|~Rural STP split for resurfacing work 106983~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - City of Zanesville resurfacing project using 4TA7 funds for CR 71 from 10.63 to 11.66. 123629~|~1~|~1~|~01/NHS~|~Funding Split for NHS 113739~|~1~|~1~|~01/SAF~|~The repair of sidewalk and ADA ramps in sections along Wyoming Ave and Mill St. Install flashing beacons, and restripe pedestrian crossing at Anna St and Wyoming Ave. Install audible pedestrian signals at existing crossing signals at Wayne Ave and Wyoming Ave. Paint high visibility cross walk at Forrer St and Wyoming Ave. Paint school zone and high visibility crossing on N. Cooper Ave and add flashing beacons at crossing, and LED advanced warning school zone signs. Paint school zone on Forrer St and add LED advanced warning school zone signs. Paint high visibility crossing at the intersection of Wyoming Ave and Mill street. Update ADA ramps at this intersection. 78791~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Tower Lighting Replacement: 1) Gue-IR 70-09.10 to 09.61; 2) Gue-IR 77-07.08 to 07.59; 110910~|~1~|~1~|~01/SAF~|~Construction of sidewalk on Sussex Avenue from Corbly Street to Coffey Street and on Coffey Street from Sussex Avenue to Kenlee Drive. 103479~|~1~|~1~|~01/STR~|~Landslide repair. MEG 124 63.42. DSR MEG-005. 82890~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 260 3.75-14.33. Not on any federal aide system funded 100% state. 100340~|~1~|~3~|~03/S<2~|~MicrosurfacingMER SR 29 SLM 15.53 - 15.79 100340~|~1~|~2~|~02/STR~|~MicrosurfacingAUG SR 29 SLM 0.00 - 2.13MER SR 29 SLM 15.79 - 18.30MER SR 29 SLM 18.30 - 18.80 100340~|~1~|~1~|~01/NHS~|~MicrosurfacingMER SR 29 SLM 13.22 - 15.53 77931~|~1~|~3~|~03/S>2~|~STP Urban funding associated with Bridges GRE-42-0790L/R (SFN 2900815 and 29000823). 77931~|~1~|~2~|~02/S>2~|~STP Urban for pavement on on US42 between SLM 6.79 to 8.02; and on SR 725 between SLM 2.46 to 2.95. 77931~|~1~|~4~|~04/STR~|~STP Rural funding for Bridge GRE-725-0624 over Glady Run (SFN 2902915). 77931~|~1~|~1~|~01/STR~|~STP Rural for pavement on on US42 between SLM 1.99 to 6.79; and on SR 725 between SLM 2.95 to 7.39. 121435~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. 123406~|~1~|~1~|~01/SAF~|~Convert existing intersection (i.e. traffic circle) into a roundabout to improve traffic flow and safety utilizing Carbon Reduction (4CU7) Federal funds at 95% up to CAP. 115117~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 218 9.28 (CFN 1819494). 109863~|~1~|~1~|~01/NHS~|~JAC Smoothseal FY25 103910~|~1~|~1~|~01/SAF~|~Reconstruction of Antioch Road (CR-12) from the Highland County line to approx. 250 feet north of Moore Road including improvements to the horizontal and vertical alignment of the roadway, widening of lanes and shoulders, and new pavement markings, RPMs, and signage. 112880~|~1~|~1~|~01/IMS~|~MAD-70 from 0.00 to 8.96 107073~|~1~|~1~|~01/NFA~|~HIG CR VAR GR 108324~|~1~|~1~|~01/NFA~|~The Port will construct a new 1325' public road starting from Commerce Pkwy and heading in a northerly direction. 111819~|~1~|~2~|~02/SAF~|~Construction of turn lanes on CR33/TR33 (Carters' Corner/Domigan Road). 111819~|~1~|~1~|~01/SAF~|~Construction of turn lanes on US36/SR37. 91900~|~1~|~5~|~05/IMS~|~Minor bridge work > 20' span. 91900~|~1~|~7~|~07/S>2~|~Minor bridge work > 20' span. 91900~|~1~|~6~|~06/NHS~|~Minor bridge work > 20' span. 91900~|~1~|~8~|~08/S>2/WARR~|~Guardrail and catch basin repairs in the City of Warren. 91900~|~1~|~1~|~01/NHS~|~Resurfacing. 91900~|~1~|~3~|~03/S>2/YOUN~|~Resurfacing, urban paving in the City of Youngstown. 91900~|~1~|~2~|~02/NHS/YOUN~|~Resurfacing, urban paving in the City of Youngstown. 91900~|~1~|~4~|~04/S>2/WARR~|~Resurfacing, urban paving in the City of Warren. 91900~|~1~|~9~|~09/NFA~|~Retroactive fuel price adjustment 85031~|~1~|~1~|~01/BRF~|~Brdg ReplacementBridge at 0.42 on CR 50 section over Rattlesnake Creek in Brown County Replace Bridge and abutments at 0.42 section on CR 50 over Rattlesnake Creek. Per CEAO letter, dated 8/28/08, federal max on project is $453,600. 0833142 BRO CR50 0.42 Intersect: Rattlesnake CreekNon FA, BR Eligible80% Fed/20% local match Brown County01/BRF/BR/BRO 83525~|~1~|~1~|~01/STR~|~Plan Split for Bridge on Rural System SFN 7605765 STA SR 183 2351 over Deer Creek 113725~|~1~|~1~|~01/SAF~|~Construct a shared use path on the west side of the road in Liberty Township. 89288~|~1~|~1~|~01/NFA~|~Resurfacing within roadway segments not along federal aid system 89288~|~1~|~2~|~02/STR~|~Resurfacing along STP Rural routes 122876~|~1~|~1~|~01/NFP~|~All work included in this plan split. 120166~|~1~|~1~|~01/NHS~|~Turn lane installation along eastbound off-ramp at 33/188 78399~|~1~|~1~|~01/BRO~|~SFN# 0460036 ATB-West Avenue over Conrail RR. SFN# 0460028 ATB-West Avenue over West 30th Street. 100787~|~1~|~1~|~01/NFP~|~Various routes. 97354~|~1~|~1~|~01/NFP~|~Split 124745~|~1~|~1~|~01/STR~|~Bridge Replacement For HOC SR 595-4.12 (FSN 3704297) 91495~|~1~|~1~|~01/SAE~|~Widen SR-747 to provide a second SB through lane for 500' at the intersection of Princeton Road 113686~|~1~|~1~|~01/NFA~|~Created for J&C involvement 109481~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 90882~|~1~|~1~|~01/STR~|~Bridge Repair 93681~|~1~|~1~|~01/STR~|~Replace 2 culvert s on SR-295 in Lucas County @ SLM 5.31 & 5.44. NO SFN assigned. 124212~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing State Funds via the Fed/State Exchange Program at 80% up to CAP. 92223~|~1~|~1~|~01/S>2~|~90/10 funding split using federal GSM funds, per direction for Resiliency Improvement Plan 96307~|~1~|~1~|~01/STR~|~It is proposed, on SR279, 0.4 mile east of McCoy Rd. (TR318), to replace the structure (SFN 4003055, SLM 4.06). 120038~|~1~|~1~|~01/NFA~|~Created for J&C involvement 83081~|~1~|~2~|~02/NHS~|~PIK US23Brdgs F/Rehab:6600212 PIK US23 5.85 Intersect: Private Road6600239 PIK CR117 6.2 Intersect: Grove Road (Old Sr 32)6600263 PIK US23 6.4 Intersect: State Route 326600298 PIK CR117 6.2 Intersect: Grove Road(Old St Rt 326600328 PIK US23 8.37 Intersect: Scioto River6600344 PIK US23 6.4 Intersect: State Route 326600352 PIK US23 8.37 Intersect: Scioto River6600360 PIK US23 9.77 Intersect: Scioto River Overflow6600425 PIK US23 10.34 Intersect: Pee Pee Creek & Flood Pl.6600514 PIK US23 10.87 Intersect: Scioto River Overflow80/20 spllit 83081~|~1~|~1~|~01/NHS~|~PIK US23 5.25 - 11.56 Resurfacing projectOn US23, begin project 5. 25 miles north of the Scioto County Line (SLM 5.25) and end 0.06 mile south of Waverly Corp. limit (SLM 11.56), it is proposed to resurface the highway with asphalt concrete. 80/20 spllit 102801~|~1~|~1~|~01/STR~|~Ful 66 resurfacing 102801~|~1~|~2~|~02/STR~|~Full 66 Bridges 100529~|~1~|~1~|~01/NFP~|~D09 Bridge Strip Seal Various Locations. 104941~|~1~|~1~|~01/MPO~|~Work eligible for CMAQ funding in the construction of the multi-use trail 113163~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance. 113163~|~1~|~4~|~04/S>2~|~Bridge preventive maintenance. 113163~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance 10' to 20' span. 113163~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance > 20' span. 113163~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance 10' to 20' structures. 113163~|~1~|~6~|~06/STR~|~Bridge preventive maintenance. 113163~|~1~|~7~|~07/NHS~|~Noise wall repairs SUM-IR 77-16.73 NB. 100159~|~1~|~1~|~01/MPO~|~80% federal w/20% local matching funds for project eligible work items. 100159~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding. 116691~|~1~|~1~|~01/IMS~|~Interstate Plan Split 116691~|~1~|~2~|~02/NHS~|~NHS Plan Split 113151~|~1~|~1~|~01/MPO~|~Split for MPO funded work. 23414~|~1~|~3~|~03/BRO~|~Split for 100% local work on CEI ducts 23414~|~1~|~4~|~04/BRO~|~Split for 100% local work on the Dominion gas line. 23414~|~1~|~2~|~02/BRO~|~Split for 100% local work on AT&T. 23414~|~1~|~1~|~01/BRO~|~90/10 fed/state funding split for all work using federal BHF funds. 1807889; CUY-042-1662 118151~|~1~|~1~|~01/S50~|~Landslide repair by drilled shaft wall. 106816~|~1~|~1~|~01/NFA~|~The City will remove a cul-de-sac at the end of Flagship Drive and relocate existing utilities. 113738~|~1~|~1~|~01/SAF~|~Install sidewalks on each side of Van Hook Avenue from Hoadley Avenue to Hayes Avenue. Improved road crossings along route by replacing ramps with ADA compliant ramps, and adding pavement markings, signs and rectangular rapid flashing beacon. Curb will be added and storm structures and drive aprons modified where necessary to accommodate sidewalk. 103817~|~1~|~1~|~01/STR~|~Bridge repair on rural route. 102871~|~1~|~1~|~01/NHS~|~Reconstruct/resurface West State Rd 101452~|~1~|~1~|~01/STR~|~DSR# COL-006 122025~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 84611~|~1~|~2~|~02/S>2~|~Resurfacing on the Urban portion of GRE-42 within the project limits. The section is between SLM 11.26 to 12.02 84611~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of GRE-42 within the project limits. The section is between SLM 12.02 to 17.91 104641~|~1~|~1~|~01/MPO~|~Resurfacing Tibbetts Wick Road (CR-28) between SR 11 and SR 193 in Liberty Township. 94144~|~1~|~2~|~02/BRF~|~Part #2 for non-eligible IBRD items added. 94144~|~1~|~1~|~01/BRF~|~Part #1 Split added for IBRD Construction funding. Eligible items are limited to additional costs for beam modifications and UHPC material. 89122~|~1~|~1~|~01/SAF~|~Pippin Road: from Galbraith Road to immediately south of the southern intersection of Compton Road. Project includes pavement repair, addition of a two way left turn lane from Galbraith Road to the bridge over Cross County Highway (SR-126), repairs to Bridge No. HAM-CR 90-0186 (over an unnamed tributary to the Mill Creek), construction of a retaining wall on the west side of Pippin Road, south of Compton Road, and possible curve realignment. Sponsor - Hamilton County 109934~|~1~|~1~|~01/S<2/HBRN~|~Resurfacing of CR 79 and MR 214E through the village of Hebron. 109934~|~1~|~2~|~02/CMQ/HBRN~|~Traffic signal replacement at US 40 and CR 79. 101683~|~1~|~1~|~01/ENH~|~01/ENH/OT/DENN - TAP eligible work at 80% federal/20% local. 101683~|~1~|~2~|~02/ENH~|~02/ENH/OT/DENN - 100% Local items of work. 104498~|~1~|~1~|~01/MPO~|~plan split 111600~|~1~|~1~|~01/NHS~|~Repair structure JEF-7-3103 (SFN 4101596) by patching substructure concrete, replacing the rocker bearings, and cleaning the steel pier cap. 120247~|~1~|~1~|~01/SAF~|~Construction of pedestrian facilities 94023~|~1~|~1~|~01/IMS~|~Total pavement replacement on the exit ramps from I-74 to SR 128 with new rigid pavement. The remaining entrance ramps onto I-74 will be resurfaced with asphalt. 110731~|~1~|~1~|~01/NHS~|~Slide repair PIK 32 12.54 112955~|~1~|~2~|~02/S<2~|~Marysville Urban Area Plan Split: UNI-245-7.051-7.32 112955~|~1~|~1~|~01/STR~|~Rural Plan Split: UNI-245-0.03-7.051 and UNI-161-0.64-0.92 112955~|~1~|~3~|~03/STR~|~Minor repair work and asphalt deck overlay on two structures (SFNs 8002827 & 8002851) and cleaning and sweeping on one structure (SF 8002800) 112955~|~1~|~4~|~04/SAF~|~Safety widening the pavement from UNI-245-0.74 to UNI-245-0.96 119927~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT/ 95569~|~1~|~1~|~01/ENH~|~Installation of pedestrian/bicycle trail from Hall of Fame bridge to the North Canton YMCA, via Dressler Road, Glenwood, and Cleveland Avenue, Stark County, Ohio. 103771~|~1~|~1~|~01/NFA~|~The TID is constructing the Harrison Road Culvert Bridge including, but not limited to, roadwork improvements by removing the old bridge construction and replacing the outdated culvert with a box precast and new structural road work at the bridge. 113105~|~1~|~1~|~01/IMS~|~SCI-52-16.77 to 18.82 120347~|~1~|~1~|~01/STR~|~Retaining wall on CR 84 119150~|~1~|~1~|~01/IMS~|~NOB-77-1.56-6.41 North Bound Resurfacing 120818~|~1~|~1~|~01/NFA~|~Replacement of existing lowering units and cameras at various locations in D07 92979~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 83-00.00 to 11.29; 92979~|~1~|~3~|~03/STR~|~"03/STR/BR/ " District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on Gue-83-0045 92979~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Gue-SR 660-00.00 to 06.33 82975~|~1~|~2~|~02/NHS~|~Plan Split for all work on SR 562 (Norwood Lateral) and all ramps to the Norwood Lateral. 82975~|~1~|~3~|~03/IMS~|~Funding split for work associated with Major Bridge HAM-71-0248R and Major Bridge HAM-71-0160. 82975~|~1~|~4~|~04/IMS~|~Plan split includes all work associated with the rehabilitation of all bridges in the project EXCEPT the Major bridges (HAM-71-0248R and HAM-71-0160). 82975~|~1~|~5~|~05/IMS~|~Plan split for slide repair work on the east side of HAM-71 from Woodburn Avenue to Montgomery Road. This work is pulled from PID 95518. 82975~|~1~|~6~|~06/IMS~|~ER repair - Restablize slope from embankment slide. 82975~|~1~|~1~|~01/IMS~|~Plane and Pave a portion of IR 71 in Hamilton County from the Lytle Tunnel to SR 562 (from SLM 1.34 to 3.20 and from SLM 4.84 to 7.78). Highway signs to be included with this Plan Split 102561~|~1~|~1~|~01/NHS~|~Split for work on the subject structure. 121077~|~1~|~1~|~01/MPO~|~Demolition of structures at 1445, 1457, and 1501 Harrison Avenue, now owned by the City of Cincinnati and on the western approach to the proposed new Western Hills Viaduct (PID 105349). 100863~|~1~|~1~|~01/NHS~|~ROS 35 25.02-34.50 100863~|~1~|~2~|~02/NHS~|~Bridge preventative maintenance workROS 35 26.05 7102429ROS 35 26.06 7102410ROS 35 27.27 7102399ROS 35 27.28 7102380ROS 35 28.49 7102445ROS 35 28.51 7102453ROS 35 29.54 7102518ROS 35 29.55 7102488ROS 35 30.06 7102569ROS 35 30.08 7102577ROS 35 33.44 7102623ROS 35 33.48 7102631ROS 35 34.02 7102607ROS 35 34.18 7102658ROS 35 34.19 7102666 100863~|~1~|~3~|~03/NHS~|~JAC 35 1.79-2.65 Safety Related Microsurfacing 118858~|~1~|~1~|~01/S>2~|~STP plan split. 118858~|~1~|~2~|~02/STR~|~added STP Rural plan split. 99798~|~1~|~1~|~01/NHS~|~See linked culvert. 99798~|~1~|~2~|~02/STR~|~See linked culverts. 99798~|~1~|~3~|~03/S>2/NCAN~|~Miscellaneous work to SFN 7670907 STA-TR 196-0.06 Easthill Street SE over West Branch Nimishillen Creek (City of North Canton) 118951~|~1~|~1~|~01/SAE~|~Plan Split for CEAO HSIP funds. 95251~|~1~|~1~|~01/NFP~|~Mowing various routes in Ashtabula, Trumbull, Mahoning, Columbiana, Stark, Wayne, Ashland, and Richland Counties. 93180~|~1~|~1~|~01/S<2~|~Work shall consist of pavement planing and resurfacing with asphalt concrete on SR 72 from 10.04 (Second Street) to SLM 10.93 (Home Road). 120195~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in the construction phase 106104~|~1~|~1~|~01/S>2~|~Fort Washington Way pump station repairs. 106104~|~1~|~2~|~02/S>2~|~For operations and maintenance. 96421~|~1~|~2~|~02/IMS~|~Plan Split for the repalcement of the DMS sign on southbound I-75 near Union Centere Blvd. 96421~|~1~|~1~|~01/IMS~|~Lengthen the acceleration lane for the northbound on ramp from east and west IR275 to get as close to the 2000' as shown in fig. 505-1b of the location and design manual. 112769~|~1~|~1~|~01/NFA~|~Plan split for the federally elligible costs associated with construction for the OBPP funded bridge replacement on Ruff Rd. 112769~|~1~|~2~|~02/BRF~|~Plan split for design costs of Design Build Team 76667~|~1~|~1~|~01/NFP~|~Full depth removal and replacement of the existing IR 70 mainline pavement, including interchange ramps; addition of a third lane in each direction as a result of MOT operations and other roadway improvements on MOT-IR-70 10.790 to 14.220 13.72 lane miles. 76667~|~1~|~2~|~02/NFP~|~Replacement of SFN 5705525 MOT IR 70 11.30. Replacement of SFN 5705495 MOT IR 70 11.30 SFN 5705703 MOT IR 70 12.67 SFN 5705738 MOT IR 70 12.67 SFN MOT IR 70 2.30 SFN 5705649 MOT IR 70 12.19. Rehabilitation of: SFN 5705614 MOT IR 70 11.92 SFN 5705584 MOT IR 70 11.92. 124435~|~1~|~1~|~01/STR~|~Work to widen and realign MRW SR 95 98616~|~1~|~1~|~01/NFP~|~Pavement repairs and drainage improvement along Ellsworth Bailey Road adjacent to the Ohio Turnpike (Exit 215), in the Village of Lordstown, Trumbull County, Ohio. 18747~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds: 4305078 108995~|~1~|~1~|~01/NHS~|~Removal of Ash trees. District wide. Safety Funded. 108995~|~1~|~2~|~02/STR~|~Removal of Ash trees. District wide. Safety Funded. 108995~|~1~|~3~|~03/NFA~|~Removal of Ash trees. District wide. Safety Funded. 108995~|~1~|~4~|~04/S<2~|~Removal of Ash trees. Safety Funded. WAS 60 3.031-3.066, 3.216/3.216, 4.468/4.468, 5.247/5.247. Urban other federal aid. 98562~|~1~|~3~|~03/BRO~|~Test Linking Bidges already on Splits 98562~|~1~|~1~|~01/NHS~|~Test 98562~|~1~|~4~|~04/STR~|~Test 98562~|~1~|~2~|~02/IMS~|~Testing Link 2 Bridges 98562~|~1~|~5~|~05/IMS~|~test 107643~|~1~|~1~|~01/STR~|~SCI 335 6.09 (SFN 7304951) 98519~|~1~|~2~|~02/STR~|~Sign Replacement: ERI 4 0.00-7.95 98519~|~1~|~1~|~01/NHS~|~Sign Replacement: CRA 30 0.00-3.68/ ERI 250 0.00-1.14, 4.39-12.47/ WAY 21 0.00-5.86/ WAY 585 16.98-18.63. 98519~|~4~|~4~|~04/SAF~|~St. Mary's School Flashers-Safety Funds. 98519~|~1~|~3~|~03/S<2~|~Sign Replacement: ERI 4 7.95-8.60, 8.92-12.20 90381~|~1~|~1~|~01/ENH~|~Enhancement Plan Split for Lighting Project on Raccoon Road 113082~|~1~|~1~|~01/SAF~|~District-wide fast drying pavement markers. 101308~|~1~|~1~|~01/NHS~|~AC Overlay on DEL-36-12.83-17.64 110462~|~1~|~1~|~01/SAE~|~Construct roundabout at the intersection of SR-123 & SR-132. 124957~|~1~|~1~|~01/MPO~|~Plan split for OKI RPP eligible expenses 116103~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 92705~|~1~|~1~|~01/MPO~|~Resurfacing CR 106 1.67 - 2.87 103301~|~1~|~1~|~01/NFP~|~Split for sign and sign support work 103301~|~1~|~2~|~02/NFP~|~Split 2 for work to replace the sign support structure at I-480 and State Road 115739~|~1~|~1~|~01/NFP~|~All work in the project is in this plan split. 107832~|~2~|~2~|~02/IMS/Colu~|~This plan split will cover the locally funded widening work. 107832~|~1~|~1~|~01/IMS~|~This plan split will cover the preservation work on the structure. 107832~|~3~|~3~|~03/SAF~|~Addition of a Shared Use Path to the Hall Road bridge. 90637~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 106276~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAR-4-10.01-13.00 106276~|~1~|~2~|~02/S<2~|~MAR 4 from 8.37 to 10.01 106276~|~1~|~3~|~03/S<2/COM~|~Eligible items not covered by Urban Paving Policy including curb ramp work and pavement repairs in the City of Marion. 117382~|~1~|~1~|~01/MPO/LOWE~|~Resurfacing. Functional Class of E McGaffney Ave between Washington Ave and Munroe St to be reclassified as Minor Arterial (Urban). 122834~|~1~|~1~|~01/ERD~|~Earmark OH469 99646~|~1~|~1~|~01/NHS~|~Replace existing steel beam bridge COL 7 2634 (SFN 1500368) with new steel beam bridge. 114080~|~1~|~1~|~01/S<2~|~Resurfacing & storm sewer replacement, curb improvements, and other misc roadway items along Trenton Ave (4B97 Small City Program to provide 95% of the eligible costs, up to a max of $658,804) 103527~|~1~|~1~|~01/S>2~|~Paving DEL-36-22.25 to 22.84 103527~|~1~|~2~|~02/STR~|~Paving DEL-36-22.84 to 28.61 103527~|~1~|~3~|~03/SAF~|~Guardrail work at Ramp A (71/36). DEL-36-17.90 to 17.93 109826~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout ATB, MAH and TRU counties. 110969~|~1~|~1~|~01/NFP~|~Bridge Inspection plan split 102039~|~1~|~1~|~01/STR~|~Slide Repair on ADA SR 348 0.05. 88777~|~1~|~1~|~01/STR~|~Replace deteriorating structure with minimal approach work on SFN 5701384 MOT 35 0036 over Tributary Tom's Run. 119174~|~1~|~1~|~01/STR~|~Resurface roadway 123428~|~1~|~1~|~01/SAE~|~First $5M in overall project costs, estimated to be $4.2M in construction costs, will be 100% Safety-funded 98813~|~1~|~2~|~02/BRF/KCEO~|~Salvage material cost from deficient bridge in Knox County - 100% local cost 98813~|~1~|~1~|~01/BRF/KCEO~|~Knox County Engineer's CEAO Local Bridge Replacement Funds - 4B87 (Federal 80%) / CB (4BG7 15%) / 4BG7 (Local 5%) - See CAP Comments - Replacement of deficient bridge (SFN 4231414) in Knox County. BR Eligible for Replacement: Length = 68'; SD/FO (1); DSR = 5; SR = 24.0 106603~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funds 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - LIC IR 70 13.71 106603~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funds 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - 1) FAI US 33 8.77; 2) FAI US 33 12.78; 3) FAI US 33 15.05; 4) FAI US 33 16.69; 5) FAI US 33 18.35; 6) FAI US 33 20.65; 7) FAI US 33 20.67; 92677~|~1~|~1~|~01/S>2~|~STP Plan Split for SUM TR 102 for SLM 1.81 to 3.06 100371~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 106260~|~1~|~1~|~01/S>2/COC~|~City of Columbus Urban Paving plan Split. 106260~|~1~|~2~|~02/S>2~|~SR-3 (ODOT Jurisdiction) Plan Split 106260~|~1~|~3~|~03/SAF~|~Widening to shift lane reduction/merge on SB SR-3 to be located south of Minerva Lake Rd intersection. 106260~|~1~|~4~|~04/S>2~|~100% Local plan split - for pavement repairs located within the City of Columbus Corp limits. 106260~|~1~|~5~|~05/S>2~|~All items of work associated with SFN: 2500191 - FRA-3-23.83 over Kilbourne Run 121563~|~1~|~1~|~01/IMS~|~Interstate Plan Split 94175~|~1~|~1~|~01/NHS~|~Replace the superstructure and abutments down to footings for BUT-27-1402 (SFN 0900753). 110426~|~1~|~1~|~01/SAF~|~Work to add the left-turn lanes and signal upgrades using federal-aid 118182~|~1~|~1~|~01/SAF~|~All items associated with safety project. 118182~|~1~|~2~|~02/NHS~|~Plan split for installing RW fence along MAR-23. 118182~|~1~|~3~|~03/STR~|~Plan split for replacement of culvert at MAR-423-1.605. 113229~|~1~|~1~|~01/NHS~|~Access Management / Safety ? Closure of US 33 median, removal of existing left turn lanes, and disconnect CR 7 (Johnson Rd) from US 33. Intersection with River Rd will remain as right in right out. ATH US 33 10.80-11.06. 96313~|~1~|~1~|~01/NFP~|~Non Fed Aid. 100% State Bridge work 106600~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - Knox County Engineer project to replace bridge Kno-CR53-2.66 (SFN 4231449) using the Federal/State Exchange Program with state max of $1,276,563 at 95% 109739~|~1~|~1~|~01/STR~|~AC overlay 109739~|~1~|~2~|~02/S>2~|~AC overlay 92623~|~1~|~1~|~01/MPO~|~Resurfacing Project 92623~|~2~|~2~|~02/S<2/WAY~|~Added plan split 2 for 100% local items 109560~|~1~|~1~|~01/BRF~|~Bridge Plan Split 86932~|~1~|~2~|~02/STR~|~Replace SFN 6704476 POR-SR 303-10.51 over Branch of Mahoning River. 86932~|~1~|~1~|~01/STR~|~Plan Split for POR SR 303 8.71 to 13.03 121794~|~1~|~1~|~01/SAF~|~GR on various CR. 99487~|~1~|~1~|~01/NHS~|~Reactive Maintenance: RIC-30-9.13-13.00 99487~|~1~|~2~|~02/IMS~|~Plane and Pave: RIC-71/30 Interchange Ramps 99487~|~1~|~3~|~03/NHS~|~Bridge Work: RIC-30-11.58 (L&R) 93787~|~1~|~2~|~02/S<2~|~02/S<2/PV/ ; This plan split is for resurfacing work inside of the City of Upper Sandusky. The City is responsible for the 20% non-federal match. The 80% federal funds will be from the District Preservation Program Budget. 93787~|~1~|~1~|~01/S<2/USAN~|~01/S<2/PV/USAN ; This plan split is for work eligible for federal funds from the small cities program. 93787~|~1~|~3~|~03/NFP/USAN~|~Work on a waterline. No ODOT or federal funds. Ohio Public Works Commission funds. 123853~|~1~|~1~|~01/SAF~|~80% CEAO HSIP, 20% Local up to $489,600, 100% local after cap and for non eligible expenses in construction 83883~|~1~|~3~|~03/STR~|~D6 funding for DEL-315: 4.10-8.40STP Rural area 83883~|~1~|~1~|~01/IMS~|~Interstate D6 funding for FRA-70 and FRA-270 83883~|~1~|~4~|~04/S<2~|~D6 funding for DEL-315: 8.40-8.65STP Small Urban (Delaware) area 83883~|~1~|~2~|~02/S>2~|~D6 funding for DEL-315:0.00-1.73 & 1.95-4.10STP Large Urban (Columbus) area 109754~|~1~|~1~|~01/STR~|~Pavement maintenance on SR 60 & 541 109754~|~1~|~2~|~02/NFA~|~Pavement maintenance on SR 621 96845~|~1~|~1~|~01/IMS~|~Provide maintenance and upkeep of the landscaping of the I70/I75 interchange. 108016~|~1~|~1~|~01/NFP~|~Pruning 113040~|~1~|~1~|~01/STR~|~All the resurfacing of SR 109 in this project. District Preservation Program funds. No local funds. 98768~|~1~|~1~|~01/SAE~|~Intersection of Detroit Ave and Glendale Ave 122128~|~1~|~1~|~01/IMS~|~Plan Split for noise barrier repair 113402~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for upgrading guardrail on county roads 104714~|~1~|~1~|~01/IMS~|~Diamond grinding on IR. 98650~|~1~|~1~|~01/IMS~|~8704953 113599~|~1~|~1~|~01/S5K~|~Traffic signal upgrade with RR crossing preemption. 102240~|~1~|~1~|~01/S<2~|~Paving on Burbank, Friendsville, Milltown and Bowman STreets. 102240~|~1~|~2~|~02/S<2~|~100% local items 102240~|~1~|~3~|~03/NHS~|~Portion of project that is NHS. Bowman Street 98167~|~1~|~1~|~01/S<2~|~Plan split for Bridge approach slab jacking. SFN 4002237 101449~|~1~|~1~|~01/IMS~|~RIC IR 71 003.19 -Culvert Repair:Removal of Bridge abutment piling that was accidently driven through the culvert. 101449~|~1~|~2~|~02/NHS~|~ERI US 0250 08.98- Culvert Repair:Installation of a concrete invert and pipe joint gaskets. 101449~|~1~|~3~|~03/STR~|~WAY SR 0095 05.49-Installation of a concrete culvert invert 117472~|~1~|~1~|~01/BRF~|~Bridge rehabilitation (SFN 2531933) 123892~|~1~|~1~|~01/NFA~|~Trail Improvement 103816~|~1~|~1~|~01/STR~|~Replace bridge superstructure on rural route. 88277~|~1~|~1~|~01/ENH~|~BRO US52 19.44 Aberdeen SRTS - Safe Routes to SchoolProject Termini: Along US52, begin @ Huntington Ave (19.44) east and terminate at Elm Street (19.94). Project Description: It is proposed to construct Phase 2 of the Aberdeen SRTS Shared Use Path begining at Huntington Parkway, east to Elm Street. 100% Fed 01/ENH/OT/Aberdeen 118535~|~1~|~1~|~01/STR~|~Bridge replacement. 118535~|~1~|~2~|~02/STR~|~Replace culvert. 94107~|~1~|~1~|~01/STR~|~Various resurfacing treatments to ATB SR 46 16.38 to 22.04, ATB SR 307 3.22 to 12.78. See work locations for specific treatments and sections. 94107~|~1~|~2~|~02/STR~|~Bridge Maintenance on SFN 0405809 ATB SR 307 7.65 over Coffee Creek, SFN 0405833 ATB SR 307 9.03 over Center Creek, SFN 0405884 ATB SR 307 11.03 over Mill Creek. 92602~|~1~|~1~|~01/STR~|~80/20 fed/state fund split for all work using federal STP funds. 104288~|~1~|~1~|~01/NFP~|~Pruning, Tree/Bush removal 119179~|~1~|~1~|~01/SAF~|~Plan split for pavement markings 108685~|~1~|~1~|~01/SAF~|~Add turn lanes and upgrade signals on US 42 at SR 257 and SR 745 108685~|~1~|~2~|~02/SAF~|~Resurfacing, shoulder widening, and guardrail upgrading Sta 89+45 to Sta 102+10 108685~|~1~|~4~|~04/SAF~|~Culvert lengthening including guardrail CFN 1821801, 1977324, 1875647 108685~|~1~|~3~|~03/NHS~|~Existing culvert length in safety section - CFN 1821801, 1977324, 1875647 and entire culvert CFN 1874858 121101~|~1~|~1~|~01/IMS~|~Construction 123708~|~1~|~1~|~01/S>2~|~plan split for resurfacing on BUT-63 97288~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 116523~|~1~|~1~|~01/NHS~|~Added plan split. 117790~|~1~|~1~|~01/NHS~|~Noise wall construction 105516~|~1~|~1~|~01/STR~|~All routes and bridges on those routes, except MAR-95 locations 105516~|~1~|~2~|~02/NHS~|~MAR-95 location and bridges on that route. 114653~|~1~|~1~|~01/STR~|~Project to Pave inverts of bridge size culverts and perform other related repairs Including PRE-503-1271, 108032~|~1~|~1~|~01/NFP~|~RPM 115023~|~1~|~1~|~01/STR~|~Rural 96770~|~1~|~1~|~01/STR~|~It is proposed on SR 41 in the Peebles Corp Limit, SLM 25.95, 0.45 miles north of the south Peebles Corp limit, to repair the steps at the cornor of Olive St. and SR 41 by making it ADA accessible. 110151~|~1~|~1~|~01/NHS~|~Paint Bridge Superstructure. 99755~|~1~|~1~|~01/SAE~|~Traffic signal for traffic control at highway-rail grade crossing. 103419~|~1~|~1~|~01/STR~|~Landslide repair. NOB 146 17.12. Work length approximately 290 ft. DSR NOB-005. 94619~|~1~|~1~|~01/IMS~|~I-475 EB exit ramp at Corey and I-475 WB exit ramp at Talmadge 97637~|~1~|~1~|~01/NFP~|~Construction of new Grafton Outpost 120664~|~1~|~1~|~01/IMS/KY~|~T1 Repairs 108143~|~1~|~1~|~01/BRO~|~Replace slab superstructure on bridge TUS-416-0478 (SFN 7905920) with new slab superstructure. Encase pier piling. Rehabilitate abutments. 122021~|~1~|~1~|~01/S>2~|~Pedestrian improvements 93971~|~1~|~1~|~01/NFP~|~FY2017 District wide raised pavement markers. 123550~|~1~|~1~|~01/NFP~|~D09 BM FY2031 105701~|~1~|~1~|~01/STR~|~Signage 105949~|~1~|~1~|~01/NFA~|~SCI-TR 262-0.48 (SFN 7334362) Mill Road 95209~|~1~|~1~|~01/NFA~|~Pave bikeway from Vine Street in Coldwater to Schunck Road in Celina. 123639~|~1~|~1~|~01/NHS~|~Repair damage caused by vehicle hit 101300~|~1~|~1~|~01/NFP~|~Chip seal plan split 92099~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to construct a roundabout at LUC CR24 4-4.2/LUC CR69 1.68-1.7 90252~|~1~|~1~|~01/STR~|~ROS Various routes in Ross County for FY2013 It is proposed to upgrade/replace guardrail on various routes in Ross CountyROS-CR-1 CROSCR00001**C 0.000 to 9.500 ROS-CR-28 CROSCR00028**C 5.190 to 5.560 ROS-CR-60 CROSCR00060**C 0.000 to 1.690 ROS-CR-60 CROSCR00060**C 2.050 to 8.150 100% Fed01/STR/OT/Ross 120192~|~1~|~1~|~01/STR~|~Sidewalk Replacement and ADA Compliance Updates 92274~|~1~|~1~|~01/BRF~|~Replace superstructure of Bridge No. CLI-CR 5-9.81 (SFN: 1430572) over Anderson Fork. 93748~|~1~|~1~|~01/SAF~|~Construct a bike ramp from Broadway Street to the Wolf Creek Bikeway from Broadway Street to the Wolf Creek Bike Path in Dayton. 123309~|~1~|~1~|~01/IMS~|~Bridge repair project. Fiber wrap column. 121698~|~1~|~1~|~01/IMS~|~Truck Parking facility on I80 in Trumbull County 116336~|~1~|~2~|~02/S>2~|~Plan split for work on Small Urban portion of SR-123. 116336~|~1~|~1~|~01/STR~|~Plan Split to resurface Rural portions of WAR-132 and WAR-123. 105224~|~1~|~1~|~01/STR~|~Bridge replacement of bridge on rural route. 123831~|~1~|~1~|~01/SAF~|~RPM FY2031. 102897~|~1~|~1~|~01/STR~|~Chip sealing SR 149 101232~|~1~|~3~|~03/STR~|~Resurface FUL-US20A from 14.08 to 18.25, Rural/Other. 101232~|~1~|~4~|~04/STR~|~SFN 2600579 -- FUL-20A-14.73 101232~|~2~|~5~|~05/S<2~|~FUL-2 from 14.90 to 16.11-- Urban Paving 101232~|~2~|~6~|~06/NFP~|~100% City Plans split for Curb and ADA Ramps 101232~|~1~|~2~|~02/S<2~|~Resurfacing FUL-US 20A from 12.49 to 12.81 and 13.06 to 14.08 Urban/Other 101232~|~1~|~1~|~01/S<2~|~Resurfacing FUL-US 20A in WAUSEON :12.810 to 13.060 - Urban Paving 101232~|~1~|~7~|~07/SAF~|~Plans split for Safety funds to install Centerline Rumble Strips 101025~|~1~|~1~|~01/SAF~|~Install traffic signals at various locations in the district. This will include LED replacement for the entire district. 122879~|~1~|~1~|~01/NFP~|~All work included in this plan split. 101979~|~1~|~1~|~01/SAE~|~100% HSIP funds from the CEAO. Guardrail is eligible for 100% federal funds. Funds needed over the CEAO cap will be provided by Allen County. 114786~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4. 91097~|~1~|~3~|~03/SAF~|~1st Priority is 100% 4HJ7 safety funds for long line pavement markings r-wr optics and grooving. 2nd Priority is 80/20 4PF7/4PS7 for the long line pavement markings without the r-wr optics and grooving 91097~|~1~|~2~|~02/BRO~|~Bridge Maintenance Work for Structures:CRA-US-30 20.780(R) - SFN 1701878 - OVER CSX RAILROAD Preventive Maintenance ? Deck Sealing (051) Reactive Maintenance ? Deck overlay(asph) (041) Minor Rehabilitation ? Bridge railing upgrade/repair (061) CRA-US-30 20.790(L) - SFN 1701851 - OVER CSX RAILROAD Preventive Maintenance ? Deck Sealing (051) Reactive Maintenance ? Deck overlay(asph) (041) Minor Rehabilitation ? Bridge railing upgrade/repair (061) 91097~|~1~|~1~|~01/NHS~|~Work for Roadway, Pavement, etc. CRA-30-15.80 to 22.21 91097~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 92010~|~1~|~2~|~02/NHS~|~7101112 District 9 19.420 7101147 District 9 19.420 7101201 District 9 21.050 7101171 District 9 21.050 92010~|~1~|~1~|~01/NHS~|~ROS US23 16.36 - 22.20 NHS Resurfacing Project80/20 split 89274~|~1~|~1~|~01/S>2~|~Split for urban paving eligible work in multiple cities. 89274~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work at 100% local cost. 124811~|~1~|~1~|~01/NHS~|~Bridge work throughout District 5. 119618~|~1~|~1~|~01/IMS/KY~|~Repair Daniel Carter bridges. 108181~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER Event. 109740~|~1~|~1~|~01/STR~|~AC overlay without repairs 109740~|~1~|~2~|~02/S<2~|~AC overlay without repairs 102418~|~1~|~1~|~01/S<2/COLU~|~Resurfacing, urban paving in the City of Columbiana 102418~|~1~|~2~|~02/S<2~|~Resurfacing 102418~|~1~|~3~|~03/STR~|~Resurfacing. 102418~|~1~|~4~|~04/S<2/COLU~|~Full and partial depth repairs and curb ramps within the City of Columbiana. 115664~|~1~|~2~|~02/SAF~|~Planning for pedestrian safety improvements in front of Vinton County High School. VIN 50 16.57-16.72. 115664~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 50 10.68-22.80 and HOC 56 4.41-9.44. 102749~|~1~|~1~|~01/S>2~|~This plan split is for bridge repair on the HAM-127 bridge 118402~|~1~|~1~|~01/NFP~|~Bridge Deck Sealing Project. 98481~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State). Federal rural STP funds. 114591~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 13 0.46. Work includes a drilled shaft wall. 88695~|~1~|~1~|~01/NFP~|~District wide general project and bridge painting inspection for FY2015/2016 106089~|~1~|~1~|~01/NHS~|~ROS 23 2.50 ROS-002 95511~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue-SR 285-00.00 to 07.92 95511~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Gue-SR 285-08.35 to 13.46 123512~|~1~|~1~|~01/NHS~|~Plan split for all work associated with LUC-25-0837L bridge. 106914~|~1~|~1~|~01/SAF~|~Plan split 94626~|~1~|~1~|~01/NFP~|~Replacing raised pavement markers throughout six District 4 counties. 108716~|~1~|~1~|~01/STR~|~Retaining wall repair, ER Event# OH18-01, DDIR# BEL-011 108716~|~1~|~2~|~02/S<2~|~Retaining wall repair, ER Event# OH18-01, DDIR# BEL-036 93547~|~1~|~1~|~01/SAE~|~srts project 93547~|~1~|~2~|~02/SAE~|~SRTS Project 124553~|~1~|~1~|~01/STR~|~Bridge Rehabilitation including deck joint replacement, partial painting and deck sealing 115155~|~1~|~1~|~01/NHS~|~Roadway full depth reconstruction including storm sewer and aggregate base. The project will also include the installation and replacement of sidewalks and the replacement of traffic signals at the intersection of Woodman Dr. and Eastman Rd. 107717~|~1~|~1~|~01/STR~|~SFN 8707170 overall length 12 feet. 102994~|~1~|~1~|~01/NHS~|~Bridge deck overlay (concrete) on GAL US 35. GAL US 35 1416 L (SFN 2701111) R (SFN 2701146) and GAL US 35 1425 L (SFN 2701170) & R (2701200). NHS route, 80% Federal and 20% State funds. 92325~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 329 16.79, SFN 0503665. Rural other federal aid funded 80 federal/20 state. 106547~|~1~|~1~|~01/IMS~|~Demo Plans Split 100852~|~1~|~1~|~01/NHS~|~ROS 23 8.39-12.82 105633~|~1~|~1~|~01/STR~|~Plan split for sign replacement 102499~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP) -"Fast dry pavement markings on Routes in District 5 in FY 2022 116374~|~1~|~1~|~01/STR~|~Resurfacing SR 171 102200~|~1~|~1~|~01/STR~|~ADA CR 100 3.43 ER Slide repair. 93183~|~1~|~1~|~01/STR~|~Remove and replace existing latex modified concrete overlay with new deck overlay system and reface both abutments with annodes replaced and tops of abutments patched with overlay on SFN 1900129 DAR US 36 0436 over Spring Branch, 93183~|~1~|~2~|~02/S<2~|~Remove and replace existing latex modified concrete overlay with new deck overlay system on SFN 1903128 DAR SR 502 0901 gas line anchor clips also repaired. 105626~|~1~|~1~|~01/S>2~|~Resurface rural route - MIA CR 25A SLM 18.16 to 19.60 105626~|~1~|~2~|~02/STR~|~Resurfacing on rural route: MIA CR250A SLM 19.60 to 20.92 89714~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for use with all items of work eligible for enhancement funding. MPO enhancement funds. 89714~|~1~|~2~|~02/ENH~|~100% local split for items not eligible or funded with enhancement money. 124010~|~1~|~1~|~01/NFA~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 82295~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an AC Inlay (Mill/Fill) treatment. HOC 33 0.00-4.21 (EB and WB). NHS route funded 80 federal/20 state. 82295~|~1~|~2~|~02/SAF~|~Lengthen EB left turn lane and add a new WB right turn lane on HOC 33 2.38. Funded 90 federal/10 state. 102903~|~1~|~1~|~01/SAE~|~Pavement markings on various Richland County roads. 123404~|~1~|~1~|~01/STR~|~Resurfacing SR 212 123704~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 684 0.00-3.88. 105755~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid 123800~|~1~|~1~|~01/S5K~|~stp 123800~|~1~|~2~|~02/STR~|~stp rural 100570~|~1~|~1~|~01/STR~|~Resurfacing HOL-39 and TUS-39 with microsurfacing, pavement repairs and pavement markings. 117792~|~1~|~1~|~01/SAF~|~Roundabout construction. All work included in this split. 91959~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of BEL-331 from SLM 5.35 to 5.85 and from SLM 9.95 to 14.42 including pavement repairs and pavement marking. 117225~|~1~|~1~|~01/NHS~|~Split for resurfacing work 123599~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over multiuse trail. 101285~|~1~|~1~|~01/STR~|~Plan split for WOO-64 and WOO-582 105636~|~1~|~1~|~01/NHS~|~Consultant CE contracts 94435~|~1~|~1~|~01/S>2~|~Bridge Replacement 112490~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 113137~|~1~|~1~|~01/NHS~|~Maintain structure HAS-151-1443 (SFN 3402223) by replacing the parapet, patching concrete and cleaning and sealing the deck. 105675~|~1~|~1~|~01/IMS~|~AC Overlay on Interstate Route. 105675~|~1~|~2~|~02/IMS~|~Plan Split for bridge hit repairs on GRE-675-1720R after accident on 12-22-2024. 118434~|~1~|~1~|~01/NFA~|~BFP Funding - 100% LBR 116152~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - No Cap - 80% Federal and 20% State - replacement of existing structure MUS SR 83 7.85 (SFN 6003907) 106109~|~1~|~1~|~01/STR~|~DSR BEL-004 106109~|~2~|~2~|~02/STR~|~DSR BEL-005 112422~|~1~|~1~|~01/NHS~|~Plan slit for conduit repair 86158~|~1~|~1~|~01/STR~|~Bridge painting project. District wide for FY 2016. 80% Federal and 20% State. 120388~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 87606~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Annual contract for replacement of RPM's within District 5 on IR; US; and SR 93863~|~1~|~1~|~01/BRO~|~Project will replace the existing pre-stressed concrete boxbeam superstructure SFN 3133923. All work will take place within existing right of way. Structure carries Willey Road (CR-63) over Dry Fork Creek and a Hamilton County Park owned bikepath. 112196~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements. 87298~|~1~|~1~|~01/BRO~|~0101982 ADA US52 12.52 Intersect: Donaldson Creek 80 Fed/20 State. 01/BRO/BR/State 84154~|~1~|~1~|~01/MPO~|~CSX Railroad Bridge over Eldean Road - grade separation by lowering Eldean Road and raising the existing railroad lin. Also widen Eldean Road from Two to Three Lanes from CR 25A West approximately 0.33 ,iles and upgrade traffic signal. 116593~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban Portion of WAR-42 88570~|~1~|~1~|~01/STR~|~SR 47-SLM 20.95 to SLM 27.09 - Microsurface SR 47 with repairsSR 274-SLM 15.24 to SLM 16.51 - Overlay SR 274 with fine graded aggregate in Jackson Center. 113565~|~1~|~1~|~01/NFA~|~Created for J&C involvement 97717~|~1~|~1~|~01/MPO~|~Resurface Auburn Road using 80% federal MPO STP funds match with 20% Local funds. 116084~|~1~|~1~|~01/STR~|~Slide repair. 97445~|~1~|~1~|~01/NFA~|~Salt Barn at Lyons Road Facility 102388~|~1~|~1~|~01/IMS~|~Mowing contract. 88418~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE 260 8.77, SFN 5602467. Not on any federal aid system funded 80 federal/20 state. 115220~|~1~|~1~|~01/SAF/HAS~|~Guardrail replacement on various county routes with 100% CEAO Safety funding (4HB7). 114592~|~1~|~1~|~01/NFA~|~Landslide repair project. ATH 690 4.21. Work includes a drilled shaft wall. 98601~|~1~|~1~|~01/IMS~|~Plan split for bridge work 98601~|~1~|~2~|~02/BRO~|~Payne over I-90 98601~|~1~|~3~|~03/NHS~|~Lorain Rd over the Rocky River at 80/20 100665~|~1~|~1~|~01/STR~|~1" Fine Graded Polymer overlay of BEL-40 SLM 6.59 to 14.57 100665~|~1~|~2~|~02/S5K~|~Asphalt resurfacing from SLM 16.95 to SLM 17.64 89047~|~1~|~1~|~01/ERD~|~Earmark funding for use on the subject project. These funds will be the first priority. 89047~|~1~|~2~|~02/S>2~|~50/50 fed/local funding split for for the balance of the work after the earmark has been used. MPO STP funds. 91807~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - 1601059 COS SR60 20.07 Intersect: Killbuck Creek; BR Eligible for Rehabilitation: Length=252 SD/FO(1) SR=86.9 DSR=3 100241~|~1~|~1~|~01/MPO~|~Repair and resurface SR-175 using MPO STP funding. 113763~|~1~|~1~|~01/NHS~|~Systematic Sign Replacement 93238~|~1~|~1~|~01/MPO~|~Replace obsolete traffic signal controllers, aging conflict monitors and the central software with next generation items within the City of Dayton. 113098~|~1~|~2~|~02/S>2~|~Minor bridge rehab > 20' span. 113098~|~1~|~1~|~01/S>2~|~Resurfacing of STA SR 236 from 2.05 to 5.50. 99051~|~1~|~1~|~01/ERD~|~Construction of new roadway along White Pond Drive, in the City of Akron, Summit County, Ohio. 116397~|~1~|~1~|~01/NFP~|~Spot paving 98769~|~1~|~1~|~01/S<2~|~Improvements to Blue Ash Road between Matson and Galbraith including rehabilitation and repair of the existing pavement, storm water improvements, water quality features, on-street parking reconfiguration, and traffic signal / RR pre-emption improvements. 98769~|~1~|~2~|~02/ENH~|~Improvements to Blue Ash Road between Matson and Galbraith including installation of lighting, sidewalks, and bus shelters. 98769~|~1~|~3~|~03/NFP~|~Installation of water line though the project limits as part of this construction contract. 98769~|~1~|~4~|~04/NFP~|~Split for hydrant relocation that is 100% local cost to the project and paid by the City, not GCWW. 100352~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 115129~|~1~|~2~|~02/NFA~|~Culvert liner project. WAS 260 3.22 (CFN 1803756). 115129~|~1~|~1~|~01/STR~|~Culvert liner project. WAS 26 19.32 (CFN 1880790). Culvert Liner WAS 26 24.14 (CFN 1880839) 108010~|~1~|~1~|~01/IMS~|~Lighting 88872~|~1~|~1~|~01/STR~|~General system preventative maintenance on various routes 94332~|~1~|~2~|~02/STR~|~Rural Major rehab section (SLM 1.51 - 7.03) 94332~|~1~|~3~|~03/BRO~|~Structure work 94332~|~1~|~1~|~01/S5K~|~SR-510 in Clyde Urbanized area (SLM 0.83 - 1.51) 94332~|~1~|~4~|~04/S5K~|~Plan Split for Part 1 Urban Paving funded work in Clyde from W. Maple Street to north Corp Limit. 94332~|~1~|~5~|~05/S50~|~Plan Split for 100% locally funded work in Clyde (pavement repairs, spot curb replacement, etc) associated with Part 1 110933~|~1~|~1~|~01/S>2~|~Plan split for paving on the Urban STP system 99540~|~1~|~1~|~01/NFP~|~Plan split for resurfacing work. 108667~|~1~|~1~|~01/NFP~|~All work in this project. 95577~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation - CRA-100-22.23 83924~|~1~|~1~|~01/BRO~|~PIK SR335, SFN 6603092, 21.65 Intersect Wilson RunBridge Rehab, Eiligable for BR funds.80% Fed/20% state 83924~|~1~|~2~|~02/BRO~|~PIK SR335, SFN 6603068, 21.51, Intersect Wilson RunBridge Replacement, Eiligable for BR funds.80% Fed/20% state 112898~|~1~|~1~|~01/STR~|~Culvert replacement. 93583~|~1~|~1~|~01/IMS~|~Type A emergency fix to stabalize an embankment/culvert failure. 93583~|~1~|~2~|~02/IMS~|~Type A emergency project to stabalize an embankment/culvert failure. 92684~|~1~|~1~|~01/S<2~|~Work inside the Delphos Urban Area but outside the City of Delphos. All funds from the District Preservation Program Budget. No local government funds. On SR 66 in Allen County from 10.49 to 10.58 on the right side of the road. On SR 190 in Allen County from 1.27 to Putnam County line on the left side of the road and from 1.26 to 1.30 on the right side of the road from 1.26 to 1.30 and from 1.32 to the Putnam County Line. 92684~|~1~|~2~|~02/S<2/DELP~|~Paving work inside the City of Delphos. The federal funds are from the District Preservation Program Budget. The 20% non-federal match will be provided by the City of Delphos. All work on SR 66 in Allen County on the left side and all work on SR 66 in Allen County on the right side starting at 10.58. All work on SR 66 in Vanwert County on both sides. Work on SR 190 from 1.26 to 1.27 on the left side and 1.30 to 1.32 on the right side. 113270~|~1~|~1~|~01/MPO~|~Split for MPO-funded multipurpose path work 98181~|~1~|~1~|~01/STR~|~Replacement of two culverts in Holmes county. 102495~|~1~|~1~|~01/IMS~|~IR 77 20.73 to 27.72 Double Micro 102495~|~1~|~2~|~02/NHS~|~US 250 11.88 to 12.79 Double Micro 97446~|~1~|~1~|~01/SAF~|~2" asphalt overlay of CR 19 (Monnett-New Winchester Road) from CR 40 (Winchester West Road) to SR 100. 118952~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding 114972~|~1~|~1~|~01/STR~|~All work in this plan split using district preservation allocations, SACs 4PF7 (80%) and 4PS7 (20%). 92341~|~1~|~1~|~01/BRO~|~Concrete simple support bridge removal and replacement with minimal approach work on SFN 1903780 DAR SR 705 0582 over Branch Ward Ditch. 92341~|~1~|~2~|~02/STR~|~SFN 1903780 DAR 705 0790 over Bear Creek single span concrete slab deck removal and replacement with minimal approach work. Possible precast structure replacement. 96300~|~1~|~1~|~01/STR~|~District 9 FY2017 Guardrail Project. Guardrail replacement in various locations along route segments. ADA 125 17.50-22.48BRO 62 28.08-30.08BRO 68 20.45-21.63 BRO 68 23.05-24.04HIG 50 18.87-20.33HIG 50 21.58-21.62ROS 50 6.25-6.70ROS 50 10.28-11.31ROS 180 1.29-4.57ROS 180 9.73-10.15 96300~|~1~|~2~|~02/NHS~|~District 9 FY2017 Guardrail Project. Guardrail replacement in various locations along route segments. BRO 68 13.36-16.01 96300~|~1~|~3~|~03/S<2~|~District 9 FY2017 Guardrail Project. Guardrail replacement in various locations along route segments. ROS 180 0.76-1.29 118871~|~1~|~1~|~01/STR~|~Resurfacing SR 93 101127~|~1~|~1~|~01/IMS~|~Systematic sign replacement at various locations throughout District 2. 124774~|~1~|~1~|~01/SAE~|~100% CEAO HSIP (4BH7) for eligible expenses 114008~|~1~|~1~|~01/SAF~|~All costs to construct the overpass. Federal funds from the ODOT Safety program with a local match from Hancock County will be used first. Federal funds from the CEAO Safety program with a local match from Hancock County will be used next. After the cap is reached funding will be from the District Preservation Program budget. 101041~|~1~|~2~|~02/STR~|~TRU SR 46 15.66 to 18.45TRU SR 193 17.78 to 22.85TRU SR 534 5.67 to 7.94 101041~|~1~|~1~|~01/S>2~|~TRU SR 534 from 5.25 to 5.67. 78163~|~1~|~1~|~01/S<2~|~General system resurfacing on DEL-42 from SLM 9.51-13.26, in Delaware urban areaIncludes asphalt overlay on 1 bridge:2101912 DEL US42 11.55 Intersect: Sugar Run01/S<2/PV/ 78163~|~1~|~2~|~02/STR~|~General system resurfacing of DEL-42: 13.26-19.17, in rural area02/STR/PV/ 106822~|~1~|~1~|~01/NFP~|~Statewide ITS maintenance contract 24975~|~1~|~1~|~01/NHS~|~Clean and paint two bridges (TUS-250-2251 L & R, SFNs 7900600, 7900635) with system OZEU. 121059~|~1~|~1~|~01/S5K~|~Chip Seal 121059~|~1~|~2~|~02/STR~|~Chip Seal 121059~|~1~|~3~|~03/NFA~|~Chip Seal 119963~|~1~|~1~|~01/NFA~|~Created for possible J&C inivovlement 121520~|~1~|~1~|~01/SAF~|~Signal & lighting replacements 107016~|~1~|~1~|~01/NFA~|~Reconstruction and improvement of Traxler Drive from County Road 15 to US route 20A 95433~|~1~|~1~|~01/NFA~|~It is proposed to construct a salt shed at the Wilgus Outpost in Lawrence County. 110384~|~1~|~1~|~01/S<2~|~Slide repair 94529~|~1~|~2~|~02/NFP~|~Culvert CFN 501650670 MAH-165-25.61 when replaced will become a structure SFN 5010000, Install pressure relief joints to the following structures...SFN 5000661 MAH-11-13.02 under New Road and SFN 5007577 MAH-680-9.90 over Midlothian Blvd. 94529~|~1~|~1~|~01/NFP~|~Culvert replacements in Mahoning County, Ohio. MAH-14-8.25, MAH-14-10.00, MAH-46-12.57, MAH-62-12.22, MAH-165-19.91, MAH-165-21.34, MAH-616-7.15. 93773~|~1~|~1~|~01/STR~|~Reface abutments with anodes, haunching out at top to cover deck spalls along abutments, encase pier columns, patch/rebuild wingwalls with anodes, correct erosion at wings, and seal longitudinal joint on wearing surface on SFN 0601268 AUG 66 1981 Prairie Creek. 123814~|~1~|~1~|~01/BRO~|~Plan split for bridge work on HEN-109-0957 & HEN-109-0988 bridges 98786~|~1~|~1~|~01/NFP~|~Replacement of culvert #780050350 (TRU-SR5-5.09) via Emergency A contract. 92683~|~1~|~1~|~01/S>2~|~100% State District Preservation funds for Construction Inspections 101642~|~1~|~1~|~01/NFA~|~Type C Emergency project to replace a bridge destroyed by flooding. GAL CR 114 2.05, SFN 2738937. Not on any federal aid system funded 95 federal/5 local. 93248~|~1~|~1~|~01/MPO~|~Widening approximately 2,000 LF of roadway by revising the existing roadway from 2 to 3 lanes (36' wide). An 8' sidewalk/bikepath will be constructed on the North side of the road along with curb and both sides on Chambersburg Road beginning 280' East of Brandt Pike (SR 201) and ending at Evergreen Woods Drive. 123891~|~1~|~1~|~01/NHS~|~Conduits linked to plan split 103779~|~1~|~1~|~01/NFA~|~ADA CR 6B 15.72 (SFN 0132705) 103779~|~1~|~2~|~02/NFA~|~Replace the Mineral Springs Road Bridge (SFN 0133019) 122409~|~1~|~1~|~01/NFP~|~Pavement markings through District 12 114898~|~1~|~1~|~01/S>2~|~Resurfacing. 80681~|~1~|~1~|~01/NHS~|~Widening of SR43 from 55th Street to Applegrove. 105696~|~1~|~1~|~01/NHS~|~NHS Route. All work is in this plan split. 113148~|~1~|~1~|~01/S>2~|~Resurfacing of TRU SR 7 5.61 to 8.41 98309~|~1~|~1~|~01/NFP~|~Auxiliary pavement marking contract throughout District Six 121754~|~1~|~1~|~01/ENH/PARK~|~Construct Headwaters Trail Phase 9. 95931~|~1~|~1~|~01/NFP~|~40' x 200' Cold Storage building with attached Decanting Station- demolish old building. 95931~|~1~|~2~|~02/NFP~|~New 60' x 150 fabric salt building at 6000 tons. Demo two domes. 96645~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 50 33.36-39.04, WAS 50 0.00-4.42, and WAS 7 4.42-10.14. NHS route funded 80 federal/20 state. 115212~|~1~|~1~|~01/NHS~|~AC Overlay w/o Rpr WAY SR 83 10.584 - 10.810 115212~|~1~|~2~|~02/NHS~|~Bridge work to be determined at a later date. 102974~|~1~|~1~|~01/NHS~|~This plan split is for NHS routes. 96425~|~1~|~1~|~01/SAE~|~Preemption Project 92032~|~1~|~1~|~01/S>2/TWIN~|~Widening, including drainage, curbs, sidewalks, drive aprons, lighting from Glenwood Drive to the Cuyahoga County line, in the City of Twinsburg, Summit County, Ohio. 96466~|~1~|~1~|~01/IMS~|~HAM-71/275-0.00 bridges (Repair and Replace Joints on 3 Bridges) - 3107787, 3117286, 31172787 104156~|~1~|~1~|~01/STR~|~ADA 41 21.42 Slide Repair. 122331~|~1~|~1~|~01/BRO~|~Plan Split for programming project. Update during project scoping. 121687~|~1~|~1~|~01/MPO/TALL~|~Resurfacing. 107238~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 376 1.32. GSM funded 80 federal/20 state. 99530~|~1~|~1~|~01/IMS~|~All work on the interstate funded at 90/10 fed/state 110010~|~1~|~1~|~01/NFP~|~Pavement Markings 113017~|~1~|~1~|~01/S<2~|~JAC 93 27.17-28.18 Local Match -Wellston 113017~|~1~|~2~|~02/S<2~|~JAC 776 11.44-12.59 Local Match - Jackson 124960~|~1~|~1~|~01/MPO~|~Resurface South University Boulevard between University/Roosevelt Blvd. Overpass to Lafayette Ave 122333~|~1~|~1~|~01/BRO~|~Plan split to program project, update during project scoping. 119383~|~1~|~1~|~01/IMS~|~Split for barrier and lighting work 85686~|~1~|~1~|~01/STR~|~Replace box culvert over Sylvia Wilson Ditch01/STR/OT/ 85686~|~1~|~2~|~02/STR~|~Replace joints and sealing on structure over Glade Run4903633 MAD SR142 5.66 Intersect: Glade Run 111619~|~1~|~1~|~01/NFP~|~Spot paving on various routes within ATB, MAH and TRU counties. 79755~|~1~|~1~|~01/S<2~|~District Allocation 96733~|~1~|~1~|~01/NHS~|~See linked structures > 20' span. 117289~|~1~|~1~|~01/NFA~|~ODNR Resurfacing 114968~|~1~|~2~|~02/NHS~|~WAY SR 0083 10.73 114968~|~1~|~1~|~01/IMS~|~ASD IR 0071 13.75 121283~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 124 40.51, CFN 1822135 and MEG 124 43.77, CFN 1866448. 115940~|~1~|~1~|~01/NFA~|~Chip seal resurfacing project. NOB CR 5A 0.00-4.67 and NOB CR 62 0.00-0.93. Funded through the Local Roads Oil and Shale Program. 101249~|~1~|~1~|~01/NFP~|~TID is constructing the Eastgate South at Clepper Lane Roundabout 84619~|~1~|~2~|~02/S<2~|~Urban area JAC SR93 17.46 - 24.46 Resurfacing ProjectSLM 17.46 - 20.24SLM 22.78 - 22.98On SR93, begin at the north corp limit of the City of Jackson and end at Wellston Corp limit. Pave Thru Brdg:4001486 JAC SR93 19.61 Intersect: Trib Of Horse Creek 84619~|~1~|~4~|~04/STR~|~JAC SR93 17.46 - 24.46 Resurfacing ProjectBrdg for Rehab:4001516 JAC SR93 21.32 Intersect: Pidgeon Creek80/20 split04/STR/BR/State 84619~|~1~|~6~|~06/S<2~|~Urban PavingJAC SR93 24.46 - 25.79 O M 781 Other Federal-Aide Highway Minor Arterial WELLSTON 84619~|~1~|~1~|~01/STR~|~JAC SR93 17.46 - 24.46 Resurfacing Project SLM 20.24 - 22.78On SR93, begin at the north corp limit of the City of Jackson and end at Wellston Corp limit. Pave Thru Brdg: 4001540 JAC SR93 22.64 Intersect: Trib. Of Pigeon Creek 80/20 split 01/STR/PV/State 84619~|~1~|~3~|~03/S<2~|~JAC SR93 17.46 - 24.46 Resurfacing ProjectBrdgs for Rehab:4000285 JAC US35 18.21 Intersect: Us 354001419 JAC SR93 18.71 Intersect: Stream80/20 split03/S<2/BR/State 84619~|~1~|~7~|~07/NHS~|~4001605 JAC -SR -93 27.320 51.3 4001613 JAC -SR -93 27.320 51.0 Mill & Fill & new joints on both structures 84619~|~1~|~5~|~05/NHS~|~Urban PavingJAC SR93 25.79 - 28.18 N P 781 NHS Non-Interstate Other Principal Arterial WELLSTON 114224~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4. 116873~|~1~|~1~|~01/S>2~|~Resurfacing 98125~|~1~|~1~|~01/S>2~|~Widening for a 400' right turn lane from Grange Hall Rd to Colonel Glenn Hwy, extension of the second NB thru-lane on National Road, north of Colonel Glenn Hwy, signal modifications at Colonel Glenn & National Road, milling and resurfacing of the entire project limits, installation of curb, gutter, and storm sewer, extension of sidewalk along the east side of National Road. 105646~|~1~|~1~|~01/STR~|~Spot repairs on Rural Route. 107975~|~1~|~1~|~01/SAE~|~Repair of a slide along Nine Mile Road by installing a drilled pier retaining wall. 119064~|~1~|~1~|~01/MPO~|~Extension of the Great Miami River trail to connect the Middletown and Monroe sections. 123244~|~1~|~1~|~01/S5K~|~Resurfacing. 110713~|~1~|~1~|~01/NHS~|~Resurfacing. 110713~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance. 110713~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance. 110713~|~1~|~4~|~04/S>2~|~Bridge preventive maintenance. 110713~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance. 124038~|~1~|~1~|~01/IMS~|~Plan split for work associated with LPA project for bridge maintenance and aesthetic improvements 102074~|~1~|~1~|~01/NHS~|~This plan split is for NHS bridges 102074~|~1~|~2~|~02/STR~|~This plan split is for STP rural bridges. 102074~|~1~|~3~|~03/IMS~|~This plan split is for Interstate bridge. 121688~|~1~|~1~|~01/MPO/TALL~|~Resurfacing. 100783~|~1~|~1~|~01/S<2~|~This is for overlay work on CHP US 36 SLM 14.88 to 15.05 covered under the Urban Paving Program. 100783~|~1~|~2~|~02/NHS~|~This is for overlay work on CHP US 68 SLM 6.55 to 6.70 covered under the Urban Paving Program. 96665~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 555 3.43-3.85. Not on any federal aid system. Funded 100% state. 96665~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MRG 377 0.00-16.86, MRG 792 0.00-5.49 and ATH 377 0.00-1.51. Rural other federal aid funded 80 federal/20 state. 106932~|~1~|~1~|~01/NHS~|~Split for urban paving work 106932~|~1~|~2~|~02/NFP~|~Work items that are 100% local participation 109577~|~1~|~1~|~01/STR~|~Culvert ReplacementJAC 327 12.95 99858~|~1~|~1~|~01/NHS~|~Remove and replace existing SDC wearing surface using hydrodemolition. Convert bridge to semi-integral abutments. Patch abutments using self consolidating concrete (SCC). Epoxy inject abutment wall cracks and seal all concrete surfaces not sealed from PID 89130. 99815~|~2~|~2~|~02/MPO~|~Pavement work for widening of Avery Road. 99815~|~1~|~1~|~01/MPO~|~Funding for extension of Tuttle Crossing Blvd and Avery Rd. There is no difference between how the 2 funding sources should be applied CO Contr 01 is the portion funded by MORPC, Co CO Cont 02 is the portion funded by Dublin only. Both can be applied to all portions of the project. 101461~|~1~|~1~|~01/STR~|~DSR# TUS-003 107393~|~1~|~1~|~01/STR~|~Chip sealing. 91006~|~1~|~1~|~01/MPO~|~Austintown Warren CR 67 3.96 - 6.58 114617~|~1~|~1~|~01/NFP~|~Bridge Operation Plans split 94068~|~1~|~1~|~01/BRF~|~Marburg Road bridge replacement over Norfolk Southern Railroad SFN: 3136744 112997~|~1~|~1~|~01/IMS~|~Culvert repair 112997~|~1~|~2~|~02/NHS~|~Culvert repair 88497~|~1~|~1~|~01/STR~|~US-224 from SLM 0.00 to 6.2 Minor Rehab, SR587 from 11.17 to 11.43 then from 11.57 to 12.07. 88497~|~2~|~2~|~02/STR~|~SEN-US-224 from SLM 6.2 to SLM 10.63 preventive maintenance. 88497~|~1~|~3~|~03/S<2~|~SEN-SR587 from 11.43 to 11.57 and then from 12.07 to 12.24 97128~|~1~|~2~|~02/SAF~|~Village of Wellington to fund difference between standard mast arms/Signal fixtures and aesthetic mast arms/signal fixtures 97128~|~1~|~1~|~01/SAF~|~Intersection Improvement.100% 4HJ7 Safety Funds capped at $163,637Remaining funds are to be paid for by the village of Wellington. 80684~|~1~|~1~|~01/ERD/AKRN~|~Construction of railroad grade separation at Evans Avenue and Metro and CSX tracks in the City of Akron, Summit County, Ohio. 94339~|~1~|~1~|~01/STR~|~SR-235 from SLM 2.48 to 10.07, then from SLM 13.11 to SLM 19.10 109074~|~1~|~1~|~01/NHS~|~Pavement repair and resurfacing existing pavement and existing shoulder width 109074~|~1~|~2~|~02/NHS~|~Widen shoulders to 4 feet, add center line and edge line rumble strips. 109074~|~1~|~3~|~03/S>2~|~City of Delaware Urban Paving Plan Split 109074~|~1~|~4~|~04/NHS~|~Culvert plan split. 116391~|~1~|~1~|~01/NHS~|~JEF-22 113848~|~1~|~1~|~01/NFP~|~All work in this plan split. The local match and any funds needed after the CEAO Federal/State Exchange Program cap is reached will be provided by Hancock County. 111001~|~1~|~1~|~01/NHS~|~Repair damage done by mainline vehicle collision to structure TUS-250-1577 L (SFN 7905017). 107702~|~1~|~1~|~01/STR~|~Resurfacing on SR 31 in Hardin County outside the Kenton urban area. From the Union County Line to the Kenton Urban Area boundary at CR 160 which is at 8.74. District preservation funds (80% 4PF7 and 20% 4PS7). No local funds. 107702~|~1~|~2~|~02/S<2~|~Resurfacing on SR 31 in Hardin County inside the Kenton Urban Area but outside of the City of Kenton. On both sides of the road from the Kenton Urban Area boundary at CR 160 which is at 8.74 to where SR 31 enters the City of Kenton on the left side at 9.96 then on the right side of road until the end of the project at the intersection of SR 292 at 10.16. District preservation funds (80% 4PF7 and 20% 4PS7). No local funds. 107702~|~1~|~3~|~03/S<2/KENT~|~Resurfacing on SR 31 in Hardin County inside the City of Kenton. On the left side of the road from where SR 31 enters the City of Kenton on the left side at 9.96 until the end of the project at the intersection of SR 292 at 10.16. District preservation funds (80% 4PF7 and 20% local funds from the City of Kenton 4BG7). 111080~|~1~|~1~|~01/STR~|~Split for culvert replacement 109070~|~1~|~1~|~01/STR~|~DEL 36 from 0.00 to 6.94 - Existing Width 109070~|~1~|~3~|~03/STR~|~Culvert work - existing length 109070~|~1~|~4~|~04/STR~|~DEL-36-0.00 - 6.94 - Widening 109070~|~1~|~5~|~05/STR~|~Culvert work - extension 109070~|~1~|~2~|~02/S>2~|~DEL-36 from 6.94 to 7.28 - Existing Width 109070~|~1~|~6~|~06/STR~|~All work associated with DEL-36-1.85 (SFN: 2100789) 93724~|~1~|~1~|~01/NFA~|~Bus Purchase. 94183~|~1~|~1~|~01/NFP~|~Construction of the Warrensville Full Service Facility 118503~|~1~|~1~|~01/STR~|~WAS 550-12.17 Culvert Replacement CFN:1986969 121268~|~1~|~1~|~01/STR~|~All Work is within this split 97095~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 144 6.31, SFN 0503185. Replace existing bridge and realign SR 144 both vertically and horizontally. Rural other federal aid funded 80 federal/20 state. 102804~|~1~|~1~|~01/IMS~|~Slide repair work eligible 112462~|~1~|~2~|~02/NFA~|~Plan split for non-federal aide work in East Cleveland. 112462~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work for Cleveland Heights portion only. 112131~|~1~|~1~|~01/IMS~|~Block PID for FY 2026 Drainage Structures throughout District 4. 107177~|~1~|~1~|~01/STR~|~All work in this plan split. Federal and state fund from the District Preservation Program budget. 101582~|~1~|~1~|~01/STR/JEFC~|~DSR# JEF-017 117963~|~1~|~1~|~01/S50~|~Urban Paving 118903~|~1~|~1~|~01/STR~|~Resurfacing SR 258 110945~|~1~|~1~|~01/S>2~|~Paving work on the Urban STP system. 122832~|~1~|~1~|~01/SAE~|~Roundabout 105125~|~1~|~1~|~01/STR~|~plan split 114948~|~1~|~1~|~01/S5K/ALLI~|~Resurfacing, urban paving in the city of Alliance. 114948~|~1~|~2~|~02/S5K/ALLI~|~ADA curb ramps and full and partial depth repairs. 87037~|~1~|~2~|~02/NFP~|~100% Local cost work items. 87037~|~1~|~1~|~01/SAF~|~90/10 funding split for federal HSIP funds 116309~|~1~|~1~|~01/BRO~|~Plan Split 01/NHS/BR/ 101596~|~1~|~1~|~01/STR~|~DSR# JEF-010 96210~|~1~|~1~|~01/SAF~|~Safety funds 115092~|~1~|~1~|~01/IMS~|~Concrete pavement repairs and diamond grinding and grooving. 97590~|~1~|~1~|~01/STR~|~ADA SR41 Slide Repair 98829~|~1~|~1~|~01/NFA~|~Mill/Fill District HQ Parking Lot and egress, stripe parking lot, reconstruct concrete sidewalks, construct positive drainage, and construct new signage at the D10 Headquarters Office. 111588~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes. 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder. 100001~|~1~|~1~|~01/NFP~|~Split for tree and brush removal 119678~|~1~|~1~|~01/NFP~|~Field Pave 123521~|~1~|~1~|~01/STR~|~GSM slide repair. 87131~|~1~|~1~|~01/NFA~|~100 % State Geotech funded slide repair 119117~|~1~|~1~|~01/S>2~|~Resurfacing. 119117~|~1~|~2~|~02/S5K~|~Resurfacing. 119117~|~1~|~3~|~03/STR~|~Resurfacing. 94073~|~1~|~2~|~02/NHS~|~See linked structures. 94073~|~1~|~1~|~01/NHS~|~Resurfacing of US-20 from SLM 12.87 to SLM 14.78, in Ashtabula Township, Ashtabula County, Ohio. 94073~|~2~|~3~|~03/NHS/ASHT~|~Total pavement replacement from Ashtabula West Corp (SLM 11.88) to Seymour Road (SLM 12.87), in the City of Ashtabula, Ashtabula County, Ohio. 94073~|~2~|~4~|~04/NHS/ASHT~|~ADA curb ramps and sidewalks in Urban section. 97934~|~1~|~1~|~01/CMQ~|~Construction of 550 foot Westbound right turn lane on Tibbetts Wick (CR28) approaching US-422 and SR-169 in Weathersfield Township, Trumbull County, Ohio. 113482~|~1~|~1~|~01/ENH~|~City of Portsmouth SRTS project 109361~|~1~|~1~|~01/STR~|~Culvert replacementJAC-139-2.70 (CFN 1814767) 105714~|~1~|~1~|~01/IMS~|~Work at the interchange of Interstate 75 and SR 65 in Allen County and the interchange of Interstate 75 and CR 99 in Hancock County. 105714~|~1~|~2~|~02/NHS~|~Work along US 30 in Allen County. 105714~|~1~|~3~|~03/STR~|~Work along SR 696 112669~|~1~|~1~|~01/STR~|~District wide culvert replacement project FY26. 101534~|~1~|~1~|~01/STR~|~DSR# HAS-005 93864~|~1~|~1~|~01/NFP~|~ODNR Resurfacing/Culvert project 89130~|~1~|~1~|~01/NHS~|~Phase 2B major rehabilitation of existing pavement; construction of an additional lane in each direction (6 lane section) MOT-US-35 18.590 to 21.200 GRE-US-35 0.000 to 0.550 89130~|~1~|~2~|~02/NHS~|~This plan split will cover the for the add a lane items 89130~|~1~|~3~|~03/NHS~|~Bridge Work 89130~|~1~|~4~|~04/NHS~|~Repairs District 8 agreed to pay 124619~|~1~|~1~|~01/NHS~|~added NHS plan split. 102628~|~1~|~1~|~01/NFP~|~Pavement Marking 102628~|~1~|~2~|~02/NFP~|~safety application for the installation of centerline rumble stripes along ASD/WAY-250 106667~|~1~|~1~|~01/ENH~|~Construct sidewalks on Lakeview Road from Wabash Ave. to Park Lane Drive including crosswalk at Wabash. 83853~|~1~|~1~|~01/STR~|~"01/STR/CV/ " - District Preservation Culvert Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert repair on: 1) ID 15412 Fai-SR 37-26.00 48" x 46' Slab Top Culvert; 2) ID 15413 Fai-SR 37-27.70 90" x 120' 3 sided Concrete Box Culvert; 114934~|~1~|~1~|~01/STR~|~Covers portions of US 224 outside of the Ottawa urban area. 114934~|~1~|~2~|~02/S5K~|~Ottawa Glandorf urban area split. US 224 from SLM 18.34 to 19.89. 115809~|~1~|~1~|~01/SAF/KCEO~|~Knox County CEAO Highway Safety Improvement Program Funding - 4HB7 (80% Federal) / LNTP (20% Local) - See CAP Comments - Widening from 10 foot lanes to 12 foot; Resurfacing and various safety enhancements. 95534~|~1~|~5~|~05/S<2~|~Split for Curb Ramps100% Local 95534~|~1~|~4~|~04/S<2~|~Resurface SR159 from SLM 3.73 to 4.32 95534~|~1~|~2~|~02/NHS~|~Resurface SR159 from SLM 2.63 to 3.73. 95534~|~1~|~1~|~01/S<2~|~SR 159 (1.22 to 2.63)This is for the City of Chillicothe portion. 95534~|~1~|~3~|~03/NHS~|~Minor Rehab of:SFN 7104413 SLM 3.73SFN 7104294 SLM 3.13SFN 7104324 SLM 3.13 114880~|~1~|~1~|~01/NHS~|~NHS plan split. 114880~|~1~|~2~|~02/S50~|~Urban Paving Plan split for locations completely inside the City of Delaware. 93877~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using a Microsurfacing asphalt treatment. WAS 60 3.60-5.20. NHS route funded 80 federal/20 state. 93877~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a Microsurfacing asphalt treatment. WAS 60 5.20-19.73 and 21.03-24.09. Rural other federal aid funded 80 federal/20 state. 108287~|~1~|~1~|~01/NHS~|~Emergency repair project.JAC 32 17.16 JAC-001 117208~|~1~|~1~|~01/MPO/CIN~|~Reconstruction of Victory Parkway/Eden Park Drive from Martin Drive to William Howard Taft. Rehabilitation of the bridge over Kemper Lane. Restriping to provide bike lanes. 102201~|~1~|~1~|~01/S<2~|~LAW CR 1 5.35 ER slide repair. 106819~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. ATH 33 15.37 L (SFN 0505838) and R (SFN 0505846). NHS route funded 80 federal/20 state. 106819~|~1~|~2~|~02/S<2~|~Concrete bridge deck overlay. ATH 278 2.94 (SFN 0503347). Urban other federal aid funded 80 federal/20 state. 84232~|~1~|~1~|~01/S>2~|~Improve sight distance of intersection of Factory Road and Richmar Drive; widen to three lanes from Nutter Park entrance to Dayton-Xenia Road. 102965~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: DAR SR 47 SLM 13.88 to 18.11, DAR SR 47 SLM 18.80 to 23.81, DAR SR 185 SLM 6.20 to 7.42 & DAR US 36 SLM 8.35 to 9.61. 102965~|~1~|~2~|~02/S<2~|~Smooth seal on small urban route: DAR SR 121 SLM 17.97 to 18.75. 107811~|~1~|~1~|~01/NFA~|~ER Event OH18-01. Landslide repair project. MOE 255 16.70-16.74. MOE_NF_0003. Funded 100% state ER. 112110~|~1~|~1~|~01/IMS~|~Emergency (Type A) to repair the wearing surface on top deck (southbound lanes) of the Brent Spence Approach bridge HAM-71-0000L near where the bridge close to where the bridge crosses over Mehring Way. 108003~|~1~|~1~|~01/SAE~|~Application of pavement markings on various county roads in Preble County. 108489~|~1~|~1~|~01/NFP~|~All work in this project. 110407~|~1~|~1~|~01/SAE~|~Safety Program Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - intersection upgrade of US 22/SR 159/CR 30. 86475~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Bridge replacement over Yellow Creek. 96556~|~1~|~4~|~04/S>2/YOUN~|~Resurfacing of MAH SR 193 from 1.36 to 1.46, MAH SR 289D from 0.42 to 0.60, MAH SR 289 from 0.00 to 0.40 and 1.41 to 1.75, CR 549 0.00 to 0.30 (will become SR 289 after LRS update), urban paving in the City of Youngstown. 96556~|~1~|~2~|~02/S>2~|~Resurfacing of MAH US 62 from 19.44 to 19.57 and MAH SR 289 from 7.28 to 9.93. 96556~|~1~|~1~|~01/NHS~|~Resurfacing of MAH US 62 from 19.36 to 19.44. Priority System. 96556~|~1~|~3~|~03/NHS/YOUN~|~Resurfacing of MAH US 422 from 3.90 to 5.06, urban paving in the City of Youngstown. 96556~|~1~|~5~|~05/NHS~|~Minor bridge work > 20' span. 96556~|~1~|~6~|~06/S>2~|~Minor bridge work > 20' span. 96556~|~1~|~7~|~07/NHS/YOUN~|~100% City of Youngstown items such as full and partial depth repairs and curb ramps. 96556~|~1~|~8~|~08/S>2/YOUN~|~100% City of Youngstown items such as full and partial depth repairs and curb ramps. 97309~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation. 105631~|~1~|~1~|~01/STR~|~plan split 109704~|~1~|~1~|~01/MPO~|~Widening of Crescentville Road from Transportation Way to Centerdale Road to provide a two way left turn lane, addition of a new traffic signal at the Chesterdale intersection, and drainage improvements. 109704~|~1~|~3~|~03/NFP/GCWW~|~Plan split for 100% locally funded work by GCWW. 109704~|~1~|~2~|~02/NFP/SPR~|~Plan split for the Tivoli traffic signal work, funded at 100% local, since the signal does not meet warrants. 98893~|~1~|~1~|~01/NFP~|~A TID funded project for the resurfacing of ATH CR 1 3.74, a portion of CR 3 New Lima Road, CR 5 Bradbury Road, a portion of CR 28 Bashan Road and profile correction and resurfacing of CR 33A Darwin Road. Funded 100% State TID funds. 107796~|~1~|~2~|~02/S<2~|~Urban Paving Plan Split: FRA-104: 1.49-1.66 1.68-1.73 3.40-3.68 3.71-4.08 107796~|~1~|~1~|~01/S>2~|~General System Split: FRA-104: 0.00-1.49 1.66-1.68 1.73-3.40 3.68-3.71 4.08-4.23 5.03-6.53 107796~|~1~|~3~|~03/S<2~|~General System Bridge Split: SFN's 250443 120431~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State 90542~|~1~|~1~|~01/MPO~|~Oxford State Road: from Yankee Road to Spurlino Way Project involves total roadway reconstruction, realignment of the roadway to straighten a sharp curve, addition of curb and gutter and a stormwater system, addition of signage and pavement markings, and reconstruction of the traffic signal at the AK Steel slag gate, where heat from slag haulers has melted existing signal wires. Wiring equipment will be replaced including the controller, signal heads, preemption system, and radio communication. 118589~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - 94443~|~1~|~1~|~01/STR~|~Bridge Repairs- MED SR 0083-03.53 94443~|~1~|~3~|~03/NHS~|~NHS Bridges-Bridge Repair- MED US 0224-15.82 94443~|~1~|~4~|~04/NHS~|~Installation of Concrete invert at ASD US 0030 02.96 94443~|~1~|~2~|~02/IMS~|~Interstate Routes- Bridge Repair-MED 71-15.29 94493~|~1~|~1~|~01/STR~|~Re-deck and painting of SFN# 7709994, SUM-SR303-10.29, over the Hike & Bike trail, in the Village of Boston Heights, Summit County, Ohio. 93273~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - Major Bridge 4BU7(Federal 80%) / 4BT7(State 20%) - CAP of $8,000,000.00 for Construction Phase - Bridge replacement of SFN #2300427 FAI US22 23.89 Intersect: Conrail Rr & Lit Rush Cr: Not BR Eligible Length=515' SD/FO(0) SR=63.5 DSR=5 87301~|~1~|~2~|~02/BRO~|~Bridge rehab on US-62 at SLM 0.51, BR eligible2502917 FRA US62 0.51 Intersect: Big Darby Creek 87301~|~1~|~1~|~01/S<2~|~Bridge rehab on US-62 at SLM 0.34, not BR eligible 2502887 FRA US62 0.34 Intersect: Big Darby Overflow 121789~|~1~|~1~|~01/S>2~|~Resurfacing CR 1 & 107 95851~|~1~|~1~|~01/MPO~|~Resurfacing of Warhurst Road (CR573) from SLM 0.00 to 0.34 and Tenney Avenue (CR-574) from SLM 0.00 to 0.95, in the City of Campbell, Mahoning County, Ohio. 102120~|~1~|~1~|~01/STR~|~Landslide repair. 102120~|~1~|~2~|~02/STR~|~Culvert to be replaced with slide repair project. 116710~|~1~|~1~|~01/STR~|~plans split for resurfacing on the rural sections 114709~|~1~|~1~|~01/IMS~|~Construction of noise wall. 123381~|~1~|~1~|~01/NFP~|~Spot paving 110649~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span. 110649~|~1~|~4~|~04/STR~|~Minor bridge rehab 10' to 20' span. 110649~|~1~|~2~|~02/STR~|~Resurfacing. 110649~|~1~|~1~|~01/S5K~|~Resurfacing. 103706~|~1~|~1~|~01/SAE~|~LAW 52 15.03-21.52 signal work. 114495~|~1~|~1~|~01/NFP~|~Major 2 project to rebuild pavement. 83548~|~1~|~2~|~02/SAF~|~Erie County - utility work-mansholes/valves/adjusted 83548~|~1~|~1~|~01/SAF~|~Intersection Improvement - 90/10 Safety Funds 83548~|~1~|~3~|~03/SAF~|~100% State Funds - District Allocation - Signal cabinet and controller 124384~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work on MLK Dr. using MPO STBG funding 86461~|~1~|~1~|~01/S>2~|~Consolidate and manage access points along existing Red Bank Road and Red Bank Expressway to establish a controlled access arterial roadway, including coordination for accommodation of multi-modal components and tie in with a new interchange at US 50. 86461~|~1~|~2~|~02/ERD~|~This plan split includes all work necessary to construct the shared use path 84613~|~1~|~1~|~01/NHS~|~Replace continuous slab superstructure of bridge CLE-32-0769N. SFN: 1300407 and Intersect: Backbone Creek 91300~|~1~|~1~|~01/STR~|~Slide Repair 105096~|~1~|~1~|~01/NFP~|~D09 Bridge Overlay FY21 118691~|~1~|~1~|~01/ENH/STPK~|~Bridge replacement. 122134~|~1~|~1~|~01/BRF~|~Replacement of SFN 4931351 (Robison Road over Deer Creek) on a modified alignment. Federal/State Exchange. 107265~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 56 4.97. GSM funded. Rural other federal aid funded 80 federal/20 state. 97302~|~1~|~1~|~01/NFP~|~100% state funding for constructing noise wall at I-70/James interchange - SW quadrant 100560~|~1~|~1~|~01/STR~|~Resurfacing of SR-122 from SLM 0.00 to SLM 3.86 in Butler County and SR-122 from 19.04 to 24.45 in Preble County. 108974~|~1~|~1~|~01/NFA~|~Development goal mentoring on general IDIQ agreements in District Nine 123724~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work on the general system 93009~|~2~|~2~|~02/NHS~|~- District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Deck Sealing and Deep Joint Sealer of bridges along Fai-US 33-8.07 to 17.39 93009~|~1~|~1~|~01/NHS~|~- District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Fai-US 33-8.07 to 17.39 103808~|~1~|~1~|~01/NFA~|~The City will construct an extension of two lane Malsbary Road from its current terminus east 650 linear feet to Kenwood Road and including a new public rail crossing surface and signalized intersection. 107415~|~1~|~1~|~01/NFP~|~Plan split 109168~|~1~|~1~|~01/SAF/FCEO~|~Fairfield County Engineer CEAO HSIP Funding ? 4HB7 (80% Federal) / LNTP (20% Local Match) ? See CAP Comments - Safety improvement of intersection of Memorial Drive and Election House Road. 115700~|~1~|~1~|~01/STR~|~Split for rural STP paving 121529~|~1~|~1~|~01/SAF~|~Raised pavement markers 96391~|~1~|~1~|~01/SAF~|~Construct sidewalk and crossing improvements including ADA curb ramps on the west side of Laurel Drive from Poppy Drive to Carnation Drive and the north side of Carantaion Drive from Laurel Drive to Hamilton Road. 95722~|~1~|~2~|~02/S<2~|~Urban Area Paving including paving in Perrysburg. Woo 25 18.29 - 20.20 95722~|~1~|~1~|~01/STR~|~Rural area paving on WOO-25 from SLM 15.82 to 18.29 95722~|~1~|~3~|~03/S<2~|~CFN 1853826 WOO-25-19.29 95722~|~1~|~4~|~04/SAF~|~Plan split for Offset Left turn lane at SR 25 and 582 96294~|~1~|~1~|~01/STR~|~HIG 134 0.00-5.18BRO 134 0.00-0.34 96294~|~1~|~2~|~02/STR~|~Bridge PM 96294~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 100513~|~1~|~1~|~01/STR~|~Asphalt resurfacing of CAR-39 and CAR-542 in Dellroy with 441 asphalt concrete and CAR-332 with a 1" Fine Graded Polymer Asphalt. 111167~|~1~|~1~|~01/NFP~|~ODNR project to resurface Lodge Road in Hocking HIlls State Park. Funded 100% State. 101354~|~1~|~1~|~01/NHS~|~Seal concrete bridge decks throughout District 11 94674~|~1~|~1~|~01/BRO~|~Bridge Rehab. SFN 11003369 CHP 560 0541 over Anderson Creek. 108168~|~1~|~1~|~01/STR~|~Emergency repair of landslide. Not permanent restoration. 100% Federal ER funds on DSR MOE-001. 102396~|~1~|~2~|~02/IMS~|~Resurfacing of SUM I-271 Rest Areas only. 102396~|~1~|~1~|~01/S>2~|~Resurfacing of SUM SR 162 from 0.00 to 2.21 and 2.42 to 5.62. 112778~|~1~|~1~|~01/IMS~|~Resurfacing. 112778~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance. 119593~|~1~|~1~|~01/MPO~|~TLCI Items 113817~|~1~|~1~|~01/NFA~|~LAW 775 18.50-23.94Major 2 funding. 89418~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 266 7.70. Several landslide areas below the roadway for over 1500 LF of SR 266. Proposed mitigation is to relocate roadway into existing hillside. 80% Federal ER funding and 20% State Emergency funding. 96534~|~1~|~1~|~01/STR~|~Maintenance contract for FY 2018 herbicidal spraying. Funded 100% state. 110668~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 20' structure. 110668~|~1~|~4~|~04/STR~|~Minor bridge rehab > 20' structure. 110668~|~1~|~5~|~05/STR~|~Minor bridge rehab 10' to 20' structure. 110668~|~1~|~1~|~01/S>2~|~Resurfacing. 110668~|~1~|~2~|~02/STR~|~Resurfacing. 110668~|~1~|~6~|~06/STR~|~New culverts. 75686~|~1~|~2~|~02/STR~|~This plan split includes all work asscoiated with the SWRWD pay items. SWRWD is providing 16% of the total cost of these items due a betterment. 75686~|~1~|~1~|~01/STR~|~Drainage Improvement including 3900 feet of stream relocation from SLM 13.43 to 14.17 along SR 177 in Butler County. Also replace culverts BUT-177-1320 (a slab top culvert on stone abutments), BUT-177-13.79 (36" CMP) and repair/extend or replace BUT-177-13.29 (a 30" concrete pipe), BUT-177-13.45 (42" concrete pipe), and BUT-177-13.98 (15" concrete pipe). Resurface SR 177 from north of SR 73 to the Preble County line. 113235~|~1~|~1~|~01/STR~|~ER Landslide repair project. MOE 78 12.35. MOE-001. 88630~|~1~|~1~|~01/NHS~|~6200338 OTT SR2 18.3 Intersect: Portage River 116490~|~1~|~1~|~01/NFP~|~D09 Culvert Project FY28. 101301~|~1~|~1~|~01/SAF~|~Modify ramps at Interstate 675 and Dayton-Yellow Springs Rd 101301~|~1~|~2~|~02/SAF~|~Work that will covered by the OPWC funds. 101301~|~1~|~3~|~03/SAF~|~City is adding their name to the vandal fencing...to be paid 100% by the City. 106264~|~1~|~2~|~02/S>2~|~Columbus Urbanized Area Split: FRA-256-0.22-0.32 106264~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-256-0.00-0.22, 0.32-1.20 106264~|~1~|~3~|~03/S>2~|~Accounts for 100% City of Reynoldsburg cost items, such as pavement repairs, special striping, etc. 116779~|~1~|~1~|~01/S5K~|~Upgrade the traffic signal hardware at the IR 77 & SR 39 interchange at Dover in Tuscarawas County. 119081~|~1~|~1~|~01/STR~|~Plan split for project to rehabilitate bridge PRE-503-23.15 which carries SR 503 over Senora Verona Rd and an abandoned Railroad. Rehab will include installation of a new wearing surface, joint repairs, and barrier upgrades. 107395~|~1~|~1~|~01/NFP~|~D04 FY 2024 culvert repairs/replacements. 99193~|~1~|~1~|~01/NFA~|~Highland County Various Routes PM 94018~|~1~|~2~|~02/NHS~|~Minor bridge > 20' span. 94018~|~1~|~1~|~01/NHS~|~Resurfacing in the City of Cuyahoga Falls, Stow, Hudson and the Village of Boston Heights, Summit County, Ohio. 102075~|~1~|~1~|~01/BRO~|~Replace deck overlay and parapets, expansion joint repair 102075~|~1~|~2~|~02/NHS~|~Replace deck overlay and parapets, repair expansion joints 88459~|~1~|~1~|~01/NFA~|~Sidewalk replacement or installation along the east and west sides of West Street, from West North Avenue to West Main Street (SR 46) and then along one side of Park Drive through City Park using SRTS funds. 113899~|~1~|~1~|~01/NFP~|~Created for TID involvement. 121565~|~1~|~1~|~01/IMS~|~Interstate Plan Split 92108~|~1~|~1~|~01/BRF~|~Replace the structure (SFN 7144769) (0.05) on West Junction Road (CR213) 7144768 ROS CR213 7.96 Intersect: Middle Fork Salt CreekCDAO funds, 80 Fed/20 local match. 01/BRF/BR/ROS 118423~|~1~|~1~|~01/STR~|~Plan split for construction items that are federally eligible. 123694~|~1~|~1~|~01/IMS~|~Temporary Shoring 110082~|~1~|~1~|~01/NHS~|~Culvert and Storm Sewer repair/replacement 102932~|~1~|~1~|~01/STR~|~STP Rural eligible. 106261~|~1~|~1~|~01/SAF~|~Work eligible for federal-aid for the safety improvement of the intersection. 106261~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 122190~|~1~|~1~|~01/SAF~|~CEAO funded plan split for pavement markings 90154~|~1~|~1~|~01/SAF/MUSK~|~"01/SAE/OT/MCEO" - County Engineer's Association Organization Pavement Marking 4HB7(100% Federal) - CAP of $150,000.00 federal - Pavement Marking on routes to be determined 114350~|~1~|~1~|~01/BRF~|~Replacement of structure. 93950~|~1~|~1~|~01/NFA~|~District wide Raised Pavement Marker project 100% State 121631~|~1~|~1~|~01/NFA~|~Pedestrian improvement 100358~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 106859~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster STP Funds - 4TA7(80% fed) / LNTP (TRC 15% Federal) / LNTP (5% local) - No CAP - Resurfacing with related work in Lancaster on Fair Avenue (CR 54) from the 4.31 (Memorial Avenue) to 4.89 High Street. 95132~|~1~|~1~|~01/IMS~|~Type B Emergency for the repair of wearing surface of the southbound approach bridge to the Brent Spence Bridge on IR-71 (Bridge HAM-71-0000L, SFN 3105946) and the HAM-71-0159 (SFN 3106608) bridge on I-71 just North of the Lytle Tunnel. 96237~|~1~|~1~|~01/STR~|~STP Rural: SLM 0.00-8.68 117439~|~1~|~1~|~01/NFA~|~TR106 (Skinner Road) superstructure only CEAO funding 18897~|~1~|~2~|~02/BRO~|~Bridge Painting RIC-030-07.55 18897~|~1~|~3~|~03/NHS~|~Bridge Painting - RIC-030-03.93 / RIC-030-09.82 18897~|~1~|~1~|~01/IMS~|~Bridge Painting MED-071-06.75 102942~|~1~|~1~|~01/NHS~|~NHS eligible. 94274~|~1~|~1~|~01/ERD/SCE~|~Resurface the parking lot of the Everett Ranger Station located at 4683 Riverview Road, Summit County, Ohio. Pave the existing gravel parking lot, with striping, minor grading. 119071~|~1~|~1~|~01/MPO~|~Construction of a new shared use path along Dawson Road between Miami Ave and Mcdonalds Commons 98245~|~1~|~1~|~01/NFA~|~Upgrade school signage and pedestiran crossings at 5 schools within the City. 110696~|~1~|~1~|~01/IMS~|~Tentative Split for interstate locations 90537~|~1~|~3~|~03/STR~|~Remove the wearing course and seal the deck with SRS on SFN 5501245 MIA 55 0489. 90537~|~1~|~1~|~01/STR~|~Resurface existing roadway with asphalt concrete on SR 55 from SLM 3.79 to 7.67 segment length 3.88 = total lane miles 7.76. and on SR 48 SLM 8.97 to 9.24 segment length .270 = total lane miles .540 90537~|~1~|~2~|~02/S>2~|~Remove and replace existing roadway on SR 55 from SLM 3.79 to 8.20 segment length 4.41 = Total Lane miles 8.82. 99376~|~1~|~1~|~01/NHS~|~AFN 5440368, MER-33-0023, on Black Creek - remove asphalt wearing surface and water proofing from non-composite box beam structure. Install LMC hard overlay (non-composite) system. Patch structure "T" joints at piers. Patch pier delaminated area using SCC concrete. 99376~|~1~|~2~|~02/STR~|~Removal of existing overlay and installation of new, reinforced, non-composite overlay. 102400~|~1~|~1~|~01/STR~|~424 Fine Graded Polymer Overlay 103626~|~1~|~3~|~03/NHS~|~Work to replace railroad structure 103626~|~1~|~4~|~04/NHS~|~Surface coarse on US 36 and SR 37 (Urban Paving) 103626~|~1~|~5~|~05/S>2~|~Surface course on SR 521 (Urban Paving) 103626~|~1~|~1~|~01/NHS~|~Roadway work on US 36 (William St and Sunbury Rd) and SR 37 (Central Ave) except surface coarse 103626~|~1~|~2~|~02/S>2~|~Roadway work on SR 521 except surface coarse 103626~|~1~|~6~|~06/ENH~|~Enhancement items. 117914~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-A 118744~|~1~|~1~|~01/S5K~|~Slope and drainage repair. 99191~|~1~|~1~|~01/SAF~|~ADA CR Various PM 121678~|~1~|~1~|~01/S>2~|~Intersection improvement 94129~|~1~|~2~|~02/STR~|~Resurfacing of STA SR 44 from SLM 16.49 to 19.41. 94129~|~1~|~3~|~03/STR~|~Bridge Maintenance SFN 7601875 SR SLM 18.43 over over Reed Ditch. 94129~|~1~|~1~|~01/S>2~|~Resurfacing of STA SR 44 from SLM 14.66 to 16.49. 97182~|~1~|~3~|~03/IMS~|~Funding to paint the clearance gages along the Combs-Hehl Bridge. 97182~|~1~|~2~|~02/IMS~|~Funding to paint the clearance gages along the Dan Beard Bridges. 97182~|~1~|~1~|~01/IMS~|~Funding to pay for painting the clearance gages along the Brent Spence Bridge. 107233~|~1~|~4~|~04/NFA~|~Resurfacing project using an asphalt overlay treatment. Not on the federal aid system - Local Road. GAL CR 40 1.00-1.20. Funded 100% Local. 107233~|~1~|~3~|~03/NFA~|~Resurfacing project using an asphalt overlay treatment. GAL CR 15 0.00-1.31, GAL CR 20 2.93-4.23, 9.60-10.59 and GAL CR 143 3.51-6.19. Not on the federal aid system - Minor Collector. Funded 80 Federal/20 Local. 107233~|~1~|~1~|~01/S<2~|~Resurfacing project using an asphalt overlay treatment. GAL CR 3 0.00-0.77, GAL CR 10 0.00-0.46, GAL CR 20 10.59-10.80 and GAL CR 35 1.82-4.16. Urban other federal aid funded 80 Federal/20 Local. 107233~|~1~|~2~|~02/STR~|~Resurfacing project using an asphalt overlay treatment. GAL CR 3 0.77-4.93, GAL CR 10 0.46-3.10, GAL CR 20 2.84-2.93, GAL CR 42 0.00-1.66 and GAL CR 50 6.36-10.35, 10.47-12.73, 13.67-15.96. Rural other federal aid funded 80 Federal/20 Local. 104821~|~1~|~1~|~01/S<2~|~Consultant Construction Inspection 111303~|~1~|~1~|~01/MPO~|~MPO funded Plans split 111303~|~1~|~2~|~02/NFP~|~100% local funded split 98685~|~1~|~1~|~01/S>2~|~This plan split covers all roadway work included in the project. Old Red Bank Road from Red Bank Expressway to MedPace Way. 98685~|~1~|~2~|~02/S>2~|~Plan Split for the new bridge over the RR. No SFN at this time. 97450~|~1~|~2~|~02/NHS~|~FY2017 Urban Paving Project in the City of Lebanon. This plan split is for SR 48 where the pay items are 100% City. 97450~|~1~|~1~|~01/NHS~|~FY2017 Urban Paving Project in the City of Lebanon. This plan split is for SR 48 where the pay items are split 80% State and 20% City. 109845~|~1~|~1~|~01/NHS~|~SCI 52 33.82-39.63LAW 52 0.00-2.17 109845~|~1~|~2~|~02/NHS~|~Bridge Maintenance 109845~|~1~|~3~|~03/SAE~|~Recessed-Wet Reflective Pavement Markings. 109845~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 103201~|~1~|~1~|~01/IMS~|~Slide repair at Diamond (SLM 20.18 to 20.31). 96242~|~1~|~1~|~01/S>2~|~STP>2. SLM 0.00-3.17 85131~|~1~|~2~|~02/STR~|~RURAL portion of Vrooman Rd to be funding with County STP funds. 85131~|~1~|~3~|~03/NHS~|~Urban portion of Vrooman w/NHS classification funded with County STP funds. 85131~|~1~|~1~|~01/S>2~|~URBAN portion of Vrooman funded with County STP funds. 117150~|~1~|~1~|~01/SAF~|~Safety funded pedestrian improvements, including sidewalks and enhanced crossing 117901~|~1~|~1~|~01/NFA~|~NEVI Round 1, CG 70-A - Preble County 92012~|~1~|~1~|~01/NHS~|~Pavement ResurfacingLAW 7 (0.00-2.30)LAW 52 (18.00-22.53 Joint Work)LAW 527 (0.00-0.56) 92012~|~1~|~2~|~02/NHS~|~Bridge Preventative MaintenanceLAW SR 7 1.85 (SFN 4400054)LAW SR 7 1.86 (SFN 4400046)LAW SR 7 2.16 (SFN 4404092)LAW SR 527 0.20 (SFN 4404041)LAW SR 527 0.21 (SFN 4404076) 92012~|~1~|~3~|~03/SAF~|~Safety Related ResurfacingLAW 52 18.00-22.53 92012~|~1~|~4~|~04/NHS~|~Added using 100% state. This is for material buyback due to unforeseen project conditions. 79319~|~1~|~2~|~02/NHS~|~Federal/Local funding for Columbus urban paving (within City of Columbus)SLM 7.04-10.69, 10.91-12.41 79319~|~1~|~4~|~04/IMS~|~90/10 D6 federal/state funding for sealing and patching on:2500353 FRA IR270 8.08 Intersect: Over I-270 79319~|~1~|~1~|~01/NHS~|~80/20 Federal/State funding for general system paving, SLM 10.69-10.91 (area not in Columbus) 79319~|~1~|~3~|~03/NHS/COL~|~100% Columbus funded items: curb ramps, drainage, pvmt repair, valve box adjusted, ped signals 79319~|~1~|~5~|~05/NHS~|~80/20 D6 federal/state funding for sealing on:2500396 FRA SR16 10.25 Intersect: Over Blacklick Ck80/20 D6 federal/state funding for sealing & patching on:2500337 FRA SR 16 7.41 Intersect: Over Big Walnut Creek 102503~|~1~|~1~|~01/STR~|~Major rehab of BEL-148 pavement 100999~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - resurfacing and related work on GUE-265-4.59 to 17.63; NOB-265-0.00 to 0.32, BEL-265-0.00 to 0.41. 100999~|~1~|~2~|~02/NFA~|~District Preservation 4PS7 (100% State) - No CAP - resurfacing and related work on MUS-376-0.00 to 5.30. 100999~|~1~|~3~|~03/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Deck Patching work on GUE-265-12.49 (SFN 3004937);GUE-265-13.43 (SFN 3004953); 97418~|~1~|~1~|~01/S>2~|~Replace SFN 7841175 TRU-CR 56-3.10 Niles Vienna Rd over Liberty Lake Stream. 97418~|~1~|~3~|~03/NFA~|~Replace SFN 7841272 TRU-TR 33-3.31 Pleasant Valley Rd over Squaw Creek. 97418~|~1~|~2~|~02/NFA~|~Replace SFN 7835248 TRU-CR 108-04.21 Risher Rd over Duck Creek. 88820~|~1~|~1~|~01/SAE~|~Install by contract traffic signals in Disitrct 8 for FY2017. 106723~|~1~|~1~|~01/SAF~|~Work to improve pedestrian and bicycle access in the City of Strongsville that is eligible for federal-aid. 86837~|~1~|~3~|~03/S<2~|~100% City of Oberlin Items 86837~|~1~|~4~|~04/NHS/OBLN~|~Urban Paving - NHS - SR 58 - 80/20 - District Allocation/City of Oberlin 86837~|~1~|~2~|~02/S<2~|~Resurfacing not within City of Oberlin Corp Limits. 86837~|~1~|~1~|~01/S<2/OBLN~|~Urban Paving - STP - SR 511 - 80/20 - District Allocation/City of Oberlin 11230~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work on this project. 117120~|~1~|~1~|~01/MPO~|~Resurfacing. 121935~|~1~|~1~|~01/STR~|~Roadside Safety improvements utilizing Bel-O-Mar STBG funds at 100%. 93803~|~1~|~1~|~01/IMS~|~Connector Rd bridge over IR-280, SFN 8705771 110035~|~1~|~1~|~01/NHS~|~Emergency Repairs of Steel beams due to over height vehicle hit. 109820~|~1~|~1~|~01/NFA~|~ADA 770 6.90-10.52 88966~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert Replacement of: 1) 6004776 MUS SR146 17.98 Intersect: Sr146 Over Ditch: Not BR Eligible L=12' SD/FO(1) SR=27.6 DSR=5; 88966~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert Replacement of: 1) 6005136 MUS SR146 27.73 Intersect: Over Br Buffalo Fork: Not BR Eligible L-18' SD/FO(1) SR=72.2 DSR="N"; 118601~|~1~|~1~|~01/STR~|~Culvert replacement. 86991~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a fine graded polymer treatment. HOC 93 0.00-7.31 and VIN 18.08-18.57. Rural other federal aid funded 80 federal/20 state. 120070~|~1~|~1~|~01/NFA~|~NEVI Round 2 71-A 124606~|~1~|~1~|~01/ENH~|~Construction of new sidewalk and corresponding ADA facilities utilizing (80%) Safe Routes to School funds and (20%) Toll Revenue Credit up to Federal maximum. 101630~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Plan Split for replacement of security gates and controllers at D05 headquarters. 109550~|~1~|~1~|~01/SAF~|~Upgrade intersection of MAR SR 98 at SR 529 109550~|~1~|~2~|~02/STR~|~Replace existing 36" storm sewer with a 48" sewer. District Preservation funds to cover cost of upsizing sewer and removal of existing 36" 101420~|~1~|~1~|~01/IMS~|~AC Overlay with repairs - CLE IR 275 SLM 8.90 to 11.40 95453~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation. 107260~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 260 1.48. GSM funded. Not on any federal aid system funded 100% state. 113013~|~1~|~1~|~01/SAF~|~ROS 159 (Bridge St & US35 EB Ramp) safety project. 113013~|~1~|~4~|~04/SAF~|~Sidewalk along the project 113013~|~1~|~3~|~03/S5K~|~Bridge St. Bridge Sidewalk addition.Major Bridge Funding. 113013~|~1~|~2~|~02/S5K~|~ROS 159 (0.74-1.50) Pavement workMajor 2 funding 113013~|~1~|~5~|~05/NFP~|~Added a plan split for the local aesthetic items. 102848~|~1~|~1~|~01/NFA~|~D09 Deck Sealing Project FY2022 117910~|~1~|~1~|~01/NFA~|~NEVI I-70-C, FRAN 112-140 99588~|~1~|~1~|~01/S5K~|~SR-163 from SLM 31.07 to 33.85 and SLM 33.98 to 39.815 99588~|~1~|~2~|~02/STR~|~SR-163 from SLM 39.815 to 41.427 87024~|~1~|~1~|~01/S>2~|~Install by contract traffic signals at various locations for FY2013-2014. This Plan Split is for the Urban Locations. 87024~|~1~|~2~|~02/STR~|~Install by contract traffic signals at various locations for FY2013-2014. This Plan Split is for the Rural Locations. 97046~|~1~|~3~|~03/SAF~|~centerline Rumble Stripes LOR-083-04.17 - 10.49 97046~|~1~|~1~|~01/STR~|~AC Overlay w/Rpr LOR SR 83 5.21 to 6.50, 4.17 to 5.21 and 6.50 to 10.49 97046~|~1~|~2~|~02/STR~|~Bridge work:LOR-SR-83 06.820 SFN 4704037 BANNISTER DITCH Minor Rehabilitation: Slope repair & prot (082)LOR-SR-83 07.690 SFN 4704061 WILLOW CREEK Preventive Maintenance: Bridge railing upgrade/repair (061) 109114~|~1~|~1~|~01/SAF~|~Intersection safety improvements. 111075~|~1~|~1~|~01/STR~|~GSM funding plan split 85267~|~1~|~1~|~01/STR~|~Replace culvert on US-20A @ SLM 1.87 in Williams County. 120593~|~1~|~1~|~01/NFA/KCEO~|~Replacement of structure carrying CR 89 over Dry Creek. 124011~|~1~|~1~|~01/ENH~|~Shared Use Path utilizing Federal TAP (80)/Safety (20) funds at 100% up to Federal funding cap. 124712~|~1~|~1~|~01/NHS~|~Plan split for work associated with rehabilitation of federal bridge on NHS route. 82392~|~1~|~2~|~02/IMS~|~Structures not eligible for BR funding: 1808079, 1808133, 1808168 82392~|~1~|~1~|~01/IMS~|~Structure eligible for BR funding: 1808109 93390~|~1~|~1~|~01/STR~|~District Allocation 105863~|~1~|~1~|~01/IMS~|~Added plan split. 119895~|~1~|~1~|~01/NFA~|~NEVI Round 2 23-B 113083~|~1~|~1~|~01/SAF~|~District-wide polyester pavement markers. 121333~|~1~|~1~|~01/NFP~|~Created for TID Involvement 113517~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 98214~|~1~|~1~|~01/NFP~|~Electrical maintenance contract throughout District Six 96128~|~1~|~1~|~01/NFA~|~Construct a new 3,000 ton salt storage building at a new Montgomery County Outpost Facility. 120912~|~1~|~1~|~01/NFP~|~Culvert replacements/repairs. 98021~|~1~|~1~|~01/STR~|~Culvert repair project. ATH 691 5.24 (CFN 1867803), HOC 664 1.70 (CFN 1802341), HOC 664 5.52 (CFN 1876198). Rural other federal aid funded 80 federal/20 state. 98021~|~1~|~2~|~02/NFA~|~Culvert repair project. MRG 376 15.56 (CFN 1845396), MRG 555 14.54 (CFN 1861943). Not on the federal aid system funded 100% state. 87663~|~1~|~1~|~01/STR~|~Reconstruction of the existing roadway and other roadway related items, full depth removal of roadway, removal and replacemetn of curb and sidewalk left side only, replacement of existing storm sewer on SR 119 from McCartyville Road (SLM 4.20) to Renee Road (SLM 4.48). 114631~|~1~|~1~|~01/NHS~|~Overlay on ROS 23. 83036~|~1~|~1~|~01/IMS~|~Resurfacing SUM IR 77 from 9.84 to 12.16 83036~|~1~|~2~|~02/IMS~|~Concrete Deck Patching and Spall Removal on the following structures:SFN 7705972 SUM-IR 76-11.48R over SUM IR 77, SFN 7706065 SUM-IR 76-11.65L over IR 76 WB, SFN 7706006 SUM-IR 76-11.50L over SUM IR 77, SFN 7706030 SUM-IR 76-11.52R over IR 76, SFN 7702736 SUM-IR 77-9.73R over Waterloo Rd, 7702701 SUM-IR 77-9.73L over Waterloo Rd.Concrete Deck Overlay to the following structures:SFN 7702760 SUM-IR 77-10.20 Under Catawba Ave, SFN 7702825 SUM-IR 77-11.28 Under Cole Ave, SFN 7702914 SUM-IR 77-11.50 Under Lovers Lane, SFN 7702949 SUM-IR 77-11.84 Under Lafollette Ave, SFN 7711220 SUM-SR 764-2.14 over IR 77 Asphalt Deck Overlay with waterproofing to the following structures:SFN 7702795 SUM-IR 77-10.79 over Firestone Blvd, SFN 7702884 SUM IR 77 10.94 over Archwood AveDeck Sealing to the following structures:SFN 7702973 SFN SUM-IR 77-12.01R over SUM SR 8, SFN 7700040 SUM-SR 8-0.23L (Ramp S - SR 8 SB to I-76 EB)Repair deteriorating panels and seal joints on top of the MSE walls for SFN 7706243 SUM-IR 76-12.30 over Arlington St. 113929~|~1~|~1~|~01/NFP~|~Construction engineering and testing tasks not attributable to a specific PID 110061~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 25 & 26 94319~|~1~|~1~|~01/STR~|~Resurfacing from SLM 5.94 to SLM 14.96. 94319~|~1~|~2~|~02/STR~|~Bridges HEN-108-9.04 Bridge Replacement 94319~|~1~|~3~|~03/STR~|~Plan split for Bridge Repair - Hen-108-8.25, 8.74 & 10.23 94319~|~1~|~4~|~04/S<2~|~This split is for the Urban Paving ( Fed/Lcl ) section within the City of Napoleon - SR 108 between Perry ( SLM 14.96 ) and Maumee River bridge ( SLM 15.59 ) 94319~|~1~|~5~|~05/S<2~|~Plan Split for the 100% City Costs in the Urban Paving section. 99020~|~1~|~1~|~01/SAF~|~District wide polyester pavement marking 93022~|~1~|~2~|~02/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Abutment repairs at GUE-77-1.11L/R, top of back wall repair on GUE-77-1.43 L and R, forward abutment repair GUE-77-1.43 L 93022~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 7BPB/4PS7(10% State) - See CAP comments - Resurfacing with related work on Gue-IR 77-00.00 to 02.51 93022~|~1~|~3~|~03/IMS~|~Facilities Rest Area Funding 4BR7(100% State) - See CAP Comment -Resurfacing with repairs of Gue-IR 77 SB Rest Area Park 30. 93022~|~1~|~4~|~04/IMS~|~Facilities State ADA Funds - 4AC7 (100% State) - See CAP Comment - ADA upgrades to rest area along SB IR 77. 110169~|~1~|~1~|~01/STR~|~Replace conduits. 117345~|~1~|~1~|~01/BRO~|~Primary Plan Split for Local Bridge Program eligible scope items 109346~|~1~|~1~|~01/NFP~|~ODNR resurfacing project at Fort Meigs 97090~|~1~|~1~|~01/NFP~|~Bridge replacement project funded by CEAO. MRG CR 35-S 4.79, SFN 5837251. Approach work on both sides is included. Funded 80 federal/20 local. 118852~|~1~|~1~|~01/STR~|~added plan split for outside mount orab 118852~|~1~|~2~|~02/STR~|~Added plan split for Mount Orab section. 119197~|~1~|~1~|~01/STR~|~Crack Seal. 119491~|~1~|~1~|~01/NFP~|~Repair of superstructure and railing 94557~|~1~|~1~|~01/IMS~|~MOT-75-1503 SFN 5708648 - Replace expansion joints, paint structural steel, replace abutment bearings.MOT-75-1554 SFN 5708761 - Replace bridge deck (possibly widen for SB ramp) paint steel.MOT-75-1582 SFN 5708796 - Replace bridge deck and paint steel. 94557~|~1~|~2~|~02/IMS~|~MOT IR 75 SLM 14.85 to 15.24 - Improve profile and superelevation of mainline roadway within the Stanley Avenue interchange. 96187~|~1~|~1~|~01/NFP~|~Construct a salt dome storage in the Vrooman Outpost in Lake County 107709~|~1~|~1~|~01/IMS~|~WOO-280-0.73 91410~|~1~|~1~|~01/STR~|~Brdg replacement. south of Pike County Line on SR335.7305168 SCI SR335 13.61 Intersect: Stream80 Fed/20 State. 01/STR/BR/State 97677~|~1~|~1~|~01/STR~|~Construct retaining wall to stop erosion 103707~|~1~|~1~|~01/SAF~|~Work eligible for SRTS infrastructure funding 120463~|~1~|~1~|~01/NFP~|~ODNR funded project to resurface entire paved areas at Zaleski State Forest. Funded 100% State. 23905~|~1~|~3~|~03/IMS~|~Plan Split to cover pavement markings. 23905~|~1~|~1~|~01/IMS~|~Plan Split for MAH IR 680 12.10 to 16.43. 23905~|~1~|~2~|~02/IMS~|~Plan Split for SFN 5007747 MAH IR 680 12.40 over Branch of Yellow Creek, SFN 5007763 MAH IR 680 13.23 under East Ohio Gas Line, SFN 5007860 & 5007879 MAH IR 680 15.40 L&R over Calla Rd, and SFN MAH IR 680 13.38 under Walker Mill Rd 120899~|~1~|~1~|~01/NFP~|~Pave overflow parking lot at park district 98384~|~1~|~1~|~01/STR~|~CRA-602-0.00 to 4.25 100177~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 56 6.70. Rural other federal aid funded 100% state. 97897~|~1~|~1~|~01/S<2~|~CR609 (OM 038) Roadway improvements will include a 2" mill and overlay of the existing asphalt surface course. Once the underlying concrete base has been exposed, the concrete will be inspected and deteriorated concrete joints will be repaired. After the bad concrete base has been repaired, a new asphalt surface will be applied. 104935~|~1~|~1~|~01/NFA~|~The Village will construct a 340 foot extension of Millcreek Blvd east of Green Red and widen 160 feet of Harvard Blvd, east of Green Rd. 107747~|~1~|~1~|~01/STR~|~Covers all work to rehab bridges 115759~|~1~|~1~|~01/NFP~|~Split for slope repair work 90936~|~1~|~1~|~01/SAE~|~SRTS Project (sidewalk & Multi use Path) in Creston 104687~|~1~|~1~|~01/NFA~|~SCI CR 253 0.00-0.95 Widening. 95690~|~1~|~1~|~01/CMQ~|~Hull Prairie from SR-65 to Roachton 94286~|~1~|~1~|~01/NFP~|~Replace existing bridge deck on SFN 5537029 Farver Road Bridge #0.15 (Eldean Covered Bridge). 87300~|~1~|~1~|~01/STR~|~Resurfacing a portion of US 68 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 87300~|~1~|~3~|~03/NFP~|~Plan Split for resurfacing work on SR 251. This is a Non-Federal Aid route. 87300~|~1~|~2~|~02/S<2~|~Plan Split for work resurfacing on US 68 from SLM 12.21-12.27. This small section is classified as Urban since it is close to Wilmington 87300~|~1~|~4~|~04/STR~|~Bridge overlay, expansion joint and bearing replacement for structure CLI-68-0711, SFN 1400967, CLI-68-2.67 replace guardrail.Replace superstructure CLI-68-0321, SFN 1400843. 87300~|~1~|~6~|~06/SAF~|~Upgrade guardrail SFN 1400924 CLI-68-450 87300~|~1~|~5~|~05/STR~|~Replace small culvert CLI-68-0592. 122901~|~1~|~1~|~01/IMS~|~Plan split 1 is for the overall truck parking site reconstruction work, not including the rest area facility which will be designed by Central Office Facilities. 84568~|~1~|~2~|~02/S>2~|~100% City of Alliance items...related to partial and full depth repairs, and sidewalks and curb ramps...in the City of Alliance, Stark County, Ohio. 84568~|~1~|~1~|~01/S>2~|~Resurfacing of US62 from SLM 36.47 to SLM 37.86 and SLM 38.60 to SLM 38.99. Resurfacing of State Route 183 from SLM 17.33 to SLM 17.66 in the City of Alliance, Stark County, Ohio. 113542~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 91931~|~1~|~2~|~02/STR~|~Plan split to include costs associated with the drainage improvement north of the northbound corporation limit outside the Village of West Elkton, which is located at the approximatel location of where Pine Street once intersected SR 503. 91931~|~1~|~4~|~04/STR~|~This plan split is to capture costs associated with bridges greater than 20 feet (federal definition of a bridge). Includes bridges PRE-503-0678, PRE-503-0697, PRE-503-1056 (>20' when measured along a skew), PRE-503-1101, and PRE-503-1170. 91931~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on a portion of SR 503 in Preble County from the Butler County line to just south of West Alexandria. 91931~|~1~|~5~|~05/STR~|~Plan split for bridges between that are between 10' and 20' (meet state definition of a bridge, but not federal definition) including guardrail upgrades at that location. These include bridges PRE-503-0018, PRE-503-0924, and PRE-503-1075. 91931~|~1~|~6~|~06/STR~|~Plan split for work asociated rehabilitationg for replacing small culverts (spans less than 10') including small culverts PRE-503-0346 and PRE-503-0436. 91931~|~1~|~3~|~03/STR~|~Plan split to capture the drainage within West Elkton from the 1.50 to the village corporation limit at 1.57, which is the appxorimate location of where Pine Street and SR 503 used to meet. 120712~|~1~|~1~|~01/ENH~|~Mercerville Multi-Use Path: Sidewalks and Lighting for Mercerville Road, SR 218 and Station Street connecting to Hannan Trace Elementary School. 113767~|~1~|~1~|~01/SAE~|~Remove and replace Type A anchor assemblies located on State and Local NHS routes. 121063~|~1~|~1~|~01/S>2~|~Pedestrian improvements along with associated work along SR750 within the City of Powell 81641~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 5 from 0.00 to 6.45, in Trumbull County, Ohio. 81641~|~1~|~2~|~02/NHS~|~See linked structures greater than 20' span. 81641~|~1~|~3~|~03/NHS~|~See linked structure 10' to 20' span. 81633~|~1~|~2~|~02/NHS~|~Plan Split to cover pavement markings. 81633~|~1~|~1~|~01/NHS~|~Resurfacing SR18 0.00-4.90 22597~|~1~|~1~|~01/BRO~|~Elmore bridge 87075~|~1~|~1~|~01/CMQ~|~CMAQ funding for all work on this project 87075~|~1~|~2~|~02/NFP~|~100% local participation pay items 92872~|~1~|~1~|~01/S<2~|~DEL-36-9.03 headwall/pipe, in Delaware urban area, STP<200,000 92872~|~1~|~2~|~02/STR~|~DEL-521-5.99 replace culvert - rural area 107678~|~1~|~1~|~01/STR~|~Resurfacing on US 224, SR 114 and SR 637 using district preservation funds (80% 4PF7 and 20% 4PS7). 107371~|~1~|~1~|~01/NFP~|~Plan Split 88886~|~1~|~2~|~02/STR~|~Bridge Work (< 20') - SFN 8503427 - District Allocation 88886~|~1~|~1~|~01/STR~|~Bridge Work - SFN 8503397 - District Allocation 92977~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on Lic-US 62-10.57 to 20.64 92977~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Lic-US 62-10.57 to 20.64 93131~|~1~|~1~|~01/ERD~|~City of Alliance; Additional sidewalks. ADA ramps. Pavement markings. Signing for school crosswalks. 118792~|~1~|~1~|~01/NHS~|~Fine Graded Polymer Modified AC Overlay (Smoothseal) WAY-30-9.18 to 11.62 118792~|~1~|~2~|~02/NHS~|~Bridge Maintenance work to be included with smoothseal project WAY-30-9.18 to 11.62 124714~|~1~|~1~|~01/SAF~|~construction of a roundabout 114667~|~1~|~1~|~01/STR~|~conduits linked 114667~|~2~|~2~|~02/NHS~|~conduit linked 119960~|~1~|~1~|~01/NFA~|~Mill Street Bridge superstructure and substructure full replacement. Remain on existing alignment. Minimum approach work. 88420~|~1~|~2~|~02/NHS~|~Pave culvert invert. WAS 260 0.48 (SFN 8403856) and WAS 550 21.29 (SFN 8404704). Purchase Order. 88420~|~1~|~1~|~01/NHS~|~Pave culvert invert. WAS 7 11.58 (SFN 8400180). NHS route funded 80 federal/20 state. Purchase Order. 121007~|~1~|~1~|~01/STR~|~Plan split for federally eligible DBT costs in both design & construction. 97775~|~1~|~1~|~01/NFP~|~Construct new Roberts Road Outpost 113855~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 98749~|~1~|~1~|~01/BRF~|~SFN 8745625 80993~|~1~|~1~|~01/MPO~|~Pavement widening 80/20 NOACA/Village plus $95,000 capped District Allocation contribution 80993~|~3~|~3~|~03/S<2~|~For work being performed outside of Village limits. This is being funded by MPO and District Preservation. 80993~|~2~|~2~|~02/S<2/LCEO~|~100% Local Items 119240~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing the routes within the STP Rural Area 119240~|~1~|~2~|~02/S5K~|~All items of work associated with the resurfacing of the routes within the STP 5,000 to 49,999 Area. 95262~|~1~|~1~|~01/SAF~|~Relocation of Harper Street and E Canal Street (US 33) intersection in the City of Nelsonville. Funded 80 federal/20 local. 93707~|~1~|~1~|~01/S>2~|~80/20 split between federal and local to resurface Auburn Road using MPO STP funds. 85681~|~1~|~1~|~01/STR~|~Replace guardrail on CR205, 0.00 - 10.38.14.38 lane miles of federal aid route100% Fed, CEAO safety funds.01/STR/OT/Ross 89129~|~1~|~1~|~01/BRF~|~Remove deck, replace superstructure with prestressed concrete beams with a composite deck. Rehabilitate and widen the piers supported on spread footings with deep foundations, replace existing abutments with new integral abutments, and associated work required to rejoin the structure with the existing approach roadways, on Heathcliff Road over the Stillwater River in Butler Township. SFN 5730082 MOT CR 228 0.00 10788~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all eligible bridge work 99582~|~1~|~1~|~01/STR~|~Resurface SR-120. 99582~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 104999~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " -Plan Split 1 109155~|~1~|~1~|~01/IMS~|~Placing asphalt concrete wearing surface on IR 77 mainline bridges in the Dover-New Philadelphia area. 109155~|~2~|~2~|~02/NHS~|~Place asphalt concrete wearing surface on Structure TUS-250-1890. 93532~|~1~|~1~|~01/SAE~|~Part 1: Extend existing path from Intermediate School south to existing path by water tower on east side of Upper Bellbrook Road to connect to school sidewalk; Extend path (current SRTS Infra. Proj.) from Middle School drive to Eden Meadows Way on south side of Feedwire Road. 93532~|~2~|~2~|~02/SAE~|~Part 2: Construct a shared use path along Upper Bellbrook Road from Feedwire to Kable's Mill Drive (See PID 96356 for Design and RW funding). 120688~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 107649~|~1~|~1~|~01/CMQ/STCE~|~Replace signalized intersection with a roundabout. 107649~|~1~|~2~|~02/S>2/NCAN~|~Waterline relocation, 100% City of North Canton cost. 112256~|~1~|~1~|~01/NFP~|~FRA Freeway Lighting maintenance contract 112256~|~1~|~2~|~02/NHS~|~Just a place holder. Project classification and Plan Split detail might change. Amount taken from D06 ELEC FY20 so conversion from going from D6 to FRA may impact. 114797~|~1~|~1~|~01/SAF~|~Safety items for roundabout 113665~|~1~|~1~|~01/MPO/BEAV~|~Widening of the Factory Road bridge over Little Beaver Creek to provide three lanes and accommodate pedestrians and bicyclists. 113476~|~1~|~1~|~01/IMS~|~Type B emergency, design-build project, to stabilize hillside along ramp from Colerain-Beekman Ave. to westbound I-74. Roadway and pavement repairs will be completed once hillside is stabilized. 121557~|~1~|~1~|~01/STR~|~STP Rural Plan Split 100884~|~1~|~1~|~01/STR~|~HIG 41 0.40 (SFN 3600459) 113326~|~1~|~1~|~01/NFP~|~The CIC will improve the intersection of Enon Rd and Speedway Dr by extending the southbound left turn lane 185 feet as well as installing all underground traffic signal infrastructure to support the D7 project 112642. 96902~|~1~|~1~|~01/NFA/SCI~|~It is proposed to replace/rebuild guardrail at various locations on the local county roads in Scioto County. 100% Fed. 99609~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during project scoping. 123674~|~1~|~1~|~01/NHS~|~Superstructure Replacement. 121423~|~1~|~1~|~01/S>2~|~Plan split to replace the existing bridge including widening the existing shoulders to 8 feet. If bridge is to be widened for a turn lane or additional capacity, a separate funding event and plan split will be needed. 121423~|~1~|~2~|~02/SAF~|~Widen bridge & Roadway for left turn lane 120942~|~1~|~1~|~01/STR/MWCD~|~Resurfacing of all roads within the Idlewood Cottage Area 105120~|~1~|~3~|~03/STR~|~Microsurfacing. 105120~|~1~|~2~|~02/S<2~|~Microsurfacing. 105120~|~1~|~1~|~01/S>2~|~Microsurfacing. 105120~|~1~|~4~|~04/S>2/MACE~|~Resurfacing, urban paving in the city of Macedonia. 114730~|~1~|~1~|~01/STR~|~Overlay on JAC 279. 114730~|~1~|~2~|~02/STR~|~Bridge PM 98742~|~1~|~1~|~01/IMS~|~REhabilitating two bridges (TUS-77-0378L SFN 7902018 and TUS-77-0378R SFN 7902042) by replacing superstructure and two other bridges (TUS-77-0388L SFN 7902077 and TUS-77-0388R SFN 7902107) by replacing deck. 98742~|~1~|~2~|~02/BRO~|~Rehabilitate bridge TUS 258 0306 (SFN 7905521) by removing and replacing deck edges and providing new asphalt overlay. 105715~|~1~|~1~|~01/MPO~|~Work eligible for federal-aid funding 94539~|~1~|~1~|~01/S>2~|~80% federal / 20% state funding split using Geologic Site Management funds 89264~|~1~|~1~|~01/BRO~|~4861108 LUC 01W79 NO DATAIntersect: NORFOLK SOUTHERN 121257~|~1~|~1~|~01/NFP~|~added HS plan split. 88945~|~1~|~1~|~01/NHS~|~Remove and replace existing bridge (TUS-250-1233F, SFN 7904770). with new steel beam bridge. 116409~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 121088~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 800 over Stillwater Creek. 109491~|~1~|~3~|~03/S50~|~Trenching & pipe for sewer work 109491~|~1~|~1~|~01/S>2~|~Reconstruct the roadway 109491~|~1~|~2~|~02/ENH~|~TA funding for concrete sidewalk and curb ramps 91577~|~1~|~1~|~01/STR~|~JAC SR124, SFN 4002377, 23.05 Intersect Rich Run80 Fed/20 State. 01/STR/BR/State 88804~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 88804~|~1~|~2~|~02/STR~|~Bridge Work: CRA-103-17.75 111710~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD. 96069~|~1~|~1~|~01/STR~|~"01/STR/OT/ " for construction of a 200 ton Salt stroage building at the Old Washington Outpost 119817~|~1~|~1~|~01/SAF~|~Pedestrian safety project. Includes sidewalk, curb extensions, curb ramps and pavement markings. ATH 329 13.64/ATH 550 10.78. 84651~|~1~|~1~|~01/NHS~|~LAW US52 15.00 - 18.00 117274~|~1~|~1~|~01/SAF~|~Safety eligible 117274~|~1~|~2~|~02/NHS~|~Local Items 90788~|~1~|~1~|~01/MPO~|~Construction of bike lanes including widening of sidewalks, installation of trees, street lighting and all appropriate street marking and signs on East Fifth Street from Wayne Avenue to Hamilton Avenue and Hamilton Avenue from East Fifth Street to Steve Whalen Boulevard. 107588~|~1~|~1~|~01/NHS~|~PIK 32 16.08-19.92 116298~|~1~|~1~|~01/NHS~|~Chip seal in ADA. 109683~|~1~|~1~|~01/STR~|~Resurfacing COL-62 from SLM 5.44 to 10.02 109683~|~1~|~2~|~02/S<2~|~Resurfacing COL-62 from SLM 10.02 to 10.83 100952~|~1~|~2~|~02/S>2~|~MAH SR 446 from 0.00 to 1.51. 100952~|~1~|~1~|~01/STR~|~MAH US 224 from 2.88 to 7.60 and 7.60 to 11.24. 121458~|~1~|~1~|~01/NFA~|~Created for J&C involvement 97597~|~1~|~1~|~01/STR~|~Herbicidal spray at various locations throughout the District. 112457~|~1~|~1~|~01/S<2~|~AC overlay 112457~|~1~|~2~|~02/STR~|~AC overlay 93623~|~1~|~1~|~01/NHS~|~Improve 2 to 4 lane transitions. MEG US 33 3.09-3.23 and 14.15-14.27. 100592~|~1~|~1~|~01/STR~|~Crack sealing of various routes in District 11. 107656~|~1~|~1~|~01/STR~|~Resurfacing on SR 67 from SR 117 at SLM 1.59 to the Kenton Urban Area boundary at SLM 13.29. District preservation funds (4PF7 - 80% and 4PS7 - 20%). 107656~|~1~|~2~|~02/S<2~|~Resurfacing on SR 67 from the Kenton Urban Area boundary at SLM 13.29 to the corporation limits of the City of Kenton at SLM 15.07. Although inside the Kenton Urban Area this work is outside of the City of Kenton. District preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds. 110094~|~1~|~1~|~01/STR~|~UNI 739 from 14.74 to 22.68 and 22.93 to 25.81 and UNI 37 from 1.95 to 2.2 (which overlaps UNI 739) 89007~|~1~|~1~|~01/IMS~|~90/10 District Allocation 107766~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4. 88700~|~1~|~1~|~01/STR~|~Pave the rural route: SHE SR 705 SLM 4.48 to 12.33 88700~|~1~|~2~|~02/S<2~|~Pave the small urban route:SHE SR 705 SLM 4.26 to 4.48 115132~|~1~|~2~|~02/S5K~|~Pavement Chip Seal ASD SR 511 10.961 TO 11.179 115132~|~1~|~1~|~01/STR~|~Pavement Chip Seal ASD SR 89 5.400 TO 14.544 ASD SR 89 0.000 TO 4.682 ASD SR 430 0.000 TO 0.602 ASD SR 511 6.970 TO 10.961 RIC SR 430 10.110 TO 12.509 100837~|~1~|~1~|~01/NHS~|~Culvert work on NHS route. 100837~|~1~|~2~|~02/STR~|~Culvert repair on rural routes. 103254~|~1~|~1~|~01/STR~|~Overlay on rural routes. 95447~|~1~|~2~|~02/NHS~|~District Preservation Paving ? 4PF7 (80% Federal) / 4PS7 (20% State) ? Resurfacing with related work on NHS routes; 1) Mus-SR 93-00.00 to 00.25; 2) Mus-SR 93-03.45 to 04.72; 3) Per-SR 93-20.52 to 27.10 95447~|~1~|~1~|~01/STR~|~District Preservation Paving ? 4PF7 (80% Federal) / 4PS7 (20% State) ? Resurfacing with related work on OFAH-Rural routes; 1) Per-SR 93-17.89 to 20.52; 2) Mus-SR 93-00.25 to 03.45. 103675~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 11.79. DSR MEG-004. 91313~|~1~|~1~|~01/IMS~|~Priority system paving of MAD-70: 0-8.62 81541~|~1~|~1~|~01/S<2~|~SCI SR140 4.94 to 5.25 SafetyOn SR140, begin project 4.94 miles north east from US52 and head north east for 0.31 miles. It is proposed to correct the horizontal and vertical alignnment of the curve on this section of highway.80/20 split 01/S<2/PV/State 81541~|~1~|~2~|~02/S<2~|~7304269 SCI SR140 5.04 Intersect: StreamBrdg ReplacementSCI SR140 4.94 Safety4.94 miles NE from US52 80/20 split02/S<2/BR/State 121023~|~1~|~1~|~01/NFA~|~Created for J&C involvement 92804~|~1~|~1~|~01/STR~|~STP funding for new bridge on UNI-245 due to floodingNo SFN yet 110475~|~1~|~1~|~01/SAE~|~Project to improve the safety and operation of the intersection of US 35 and SR 121 100333~|~1~|~1~|~01/STR~|~This is a placeholder Plan Split entered for the funding can be entered. More than one split will be needed. Actual splits will be entered later. 117524~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 231 1.62 SFN 0545430. Funded 95% State/5% Local. 98752~|~1~|~1~|~01/S<2~|~Culvert replacement/retaining wall on MOE 536 1.24/1.37. Urban other federal aid funded 80 federal/20 state. 121726~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay without Repairs HUR -61-20.559 to 23.764 including bridge maintenance 121726~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay without Repairs HUR-61-23.764 to 23.910 123728~|~1~|~1~|~01/NHS~|~nhs bridge 123728~|~1~|~2~|~02/NHS~|~Jackson NHS plan split. 91764~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an asphalt overlay treatment. VIN SR 32 0.00-7.67. NHS federal aid route funded 80 federal/20 state. 94632~|~1~|~1~|~01/SAF~|~Access management, lighting and pedestrian improvments between Gerlaugh and Dillie roads. 94632~|~1~|~2~|~02/S<2~|~An extension of 8" water main along Dalton Drive acorss State Route 235 to connect to an existing 12" water main 112782~|~1~|~1~|~01/ERD~|~Split for Earmark ID OH-442 funded eligible resurfacing work. 101935~|~1~|~1~|~01/ENH~|~Stormwater improvements. 115954~|~1~|~1~|~01/S>2~|~Plan split for federally eligible items in construction. 115954~|~2~|~2~|~02/S>2~|~Plan Split for 100% Locally funded work items. 114359~|~1~|~1~|~01/NFA~|~Created for J&C involvement 121732~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 90759~|~1~|~1~|~01/IMS~|~90/10 funding split using federal Noise Wall Replacement funding. 90759~|~1~|~2~|~02/IMS~|~Split for 100% local work 87093~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 28 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. Limits are from SLM 0-3.01 and from SLM 10.38 to 18.17. 87093~|~1~|~3~|~03/STR/BLAN~|~This Plan Split is for the utility trench repair along SR 28 in the Village of Blanchester. The Village is applying for an OPWC grant to pay for it. 87093~|~1~|~2~|~02/STR~|~This plan split to include all costs associated with the following bridges: CLI-28-1475 (SFN 1400606) and CLI-28-1691 (SFN 1400746). 114281~|~1~|~1~|~01/IMS~|~Mowing contract - D8 114281~|~1~|~2~|~02/IMS~|~Mowing contract in D7 on: MOT IR 675 SLM 0.00 to 7.44 MOT IR 75 SLM 0.00 to 9.31 91731~|~1~|~1~|~01/IMS~|~Replace deteriorated bridge decks SFN 1206567 CLA-IR-70 3.10 SFN 1206575 CLA-IR 70 3.12 94038~|~1~|~1~|~01/NFA~|~Within Shawnee State Forest, It is propsoed to replace the culverts on Roads, 4, 6, & 19. 100% State 01/NFA/OT/State 120670~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work on E. Walnut Avenue and S. State Street, MPO STGB funding. 111643~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 376 1.10. GSM funded. Rural other federal aid funded 80 Federal/20 State. 102457~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 0.00 to US 30, SR 45 from SLM 22.03 to 22.13 and SR 558 pavement from SLM 10.47 to 12.56 102457~|~1~|~2~|~02/S<2~|~Resurfacing SR 45 from SLM 22.13 to US 62 and SR 558 from SLM 1.52 to 2.16 102457~|~1~|~3~|~03/NFA~|~Resurfacing SR 558 from SLM 0.00 to 1.52 and from SLM 2.16 to 10.15 97091~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 4 0824 WT, SFN 8430217 funded by CEAO. Replacement of existing single span truss on existing alignment with incidental roadway approach work. Funded 80 federal/20 local. 119574~|~1~|~1~|~01/SAF~|~Construction of sidewalk and ADA ramps at the intersection of US-42 and West Ave. and Perry Pike. 92369~|~1~|~1~|~01/STR~|~resurface SAN SR 101 4.55-9.66 - Clyde East Corp line to Ohio Turnpike 92369~|~1~|~2~|~02/S<2~|~From SLM 3.88 to SLM 4.55 Urban Pav 88523~|~1~|~1~|~01/STR~|~resurface SEN SR67 0.00-2.32 - Wyandot County Line to SR-100 88523~|~1~|~2~|~02/S<2~|~@ SLM 0.46 and SLM 1.17 108932~|~1~|~1~|~01/MPO~|~Various street resurfacing 101763~|~1~|~1~|~01/STR~|~Plan Spit "01/STR/PV/ " - Plan Split 1 100422~|~1~|~2~|~02/NHS~|~7100930 ROS 23 15.32L (Dry Run Rd)7100965 ROS 23 15.32R (Dry Run Rd)7100906 ROS 23 13.06 (Marietta Rd) 100422~|~1~|~1~|~01/NHS~|~ROS 23 12.82-16.36ROS 35 20.45-20.56 93819~|~1~|~1~|~01/S>2~|~Resurfacing of Howe Avenue between Main Street and Buchholzer Boulevard, in the City of Cuyahoga Falls. Includes pavement repairs, signage, light poles, storm sewers, as needed. 93819~|~1~|~2~|~02/S>2~|~Repair of sign support at the end of SUM SR8 ramp and Howe avenue. 108115~|~1~|~2~|~02/S<2~|~WAS SR 618 3.22-6.23. Full depth pavement repair and curb ramp work. 80% Federal MPO funds and 20% Local match. 108115~|~1~|~1~|~01/S<2~|~Asphalt resurfacing project. 80% Federal and 20% Local match. WAS 618 3.219-3.254 WB only, 3.254-3.389. 3.389-3.564 EB only, 3.564-4.500, 4.500-4.559 WB only, 4.559-6.230. 108115~|~1~|~3~|~03/S<2~|~Asphalt resurfacing project. Funded 80% Federal/20% State. WAS 618 3.219-3.254 EB only, 3.389-3.564 WB only, 4.500-4.559 EB only. 108115~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 107386~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work. 113388~|~1~|~1~|~01/SAF~|~Guardrail installation project on various routes in Gallia County using HSIP funds. Funded 100% Federal. 123264~|~1~|~1~|~01/IMS~|~Construct Noice Wall 109909~|~1~|~1~|~01/NHS~|~Landslide repair, 100% state funded. 93859~|~1~|~1~|~01/CMQ~|~Provide an 8 ft. sidepath along the east side of Grange Hall Road from Patterson Road to SR835. Including curb and gutter and new storm sewer along the east side of Grange Hall Road. A bike/pedestrian bridge will also be installed over the Little Beaver Creek to the east of the existing bridge. 121658~|~1~|~1~|~01/BRO~|~Replace overlay and joints 88723~|~1~|~1~|~01/STR~|~0103470 ADA SR136 17.33 Intersect: StreamBrdg Replacement 80 Fed/20 State. 01/STR/BR/State 102227~|~1~|~1~|~01/NHS~|~New Miami St connector. 102227~|~1~|~2~|~02/NFP~|~New Part Code for additional lane on Connector Road; To be paid by LPA 107136~|~1~|~1~|~01/BRF~|~Replacement of SFN 6842445 which carries Spring Street over Rocky Fork in New Paris, OH. 110976~|~1~|~1~|~01/SAF~|~Active railroad warning devices being installed within 200 feet of the traffic signal requires preemption to meet MUTCD and to keep vehicles off the track when a train is approaching. 84580~|~1~|~1~|~01/STR~|~Federal Rural STP funds. No eligible for federal bridge funds. All funds from the District Preservation Program. 80% SAC 4PF7 and 20% SAC 4PS7. 109779~|~1~|~1~|~01/S<2~|~Microsurfacing 109779~|~1~|~2~|~02/STR~|~Microsurfacing 98118~|~1~|~1~|~01/NHS/MAR~|~NHS Urban Paving Marion SLM 10.01 to 12.99 88747~|~1~|~1~|~01/SAF~|~Highway Lighting Maintenance Contract for highway lighting in District 7 - 2 years. This plan split is for work to be performed in District 7. 88747~|~1~|~2~|~02/SAF~|~Highway Lighting Maintenance Contract for highway lighting in District 8 - 2 years. This split is for work to be performed in District 8. 107958~|~1~|~1~|~01/NHS~|~plans plit 110553~|~1~|~1~|~01/IMS~|~Bridge Repair. 102451~|~1~|~1~|~01/NFP~|~Split for painting the structural steel of all structures 100672~|~1~|~1~|~01/STR~|~Chip sealing HAS-9 from SR 151 to CAR Co. Line and HAS-519 from US 22 to New Athens. 96659~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 78 30.64-36.83. Rural other federal aid funded 80 federal/20 state. 106133~|~1~|~1~|~01/NFA~|~Landslide repair, NOB 513 7.00. Not on any federal aid system funded 100% state. 98576~|~1~|~1~|~01/SAF~|~This plan split contains all work required to construct the project. This includes work along Feedwire from Adam?s Place to Eden Meadows Way. This section of path will also include the installation of a crosswalk at Adam?s Place and on Feedwire Road at the Roger Scott/Eden Meadows Way intersection. 104194~|~1~|~1~|~01/MPO~|~Plans Split for project 82968~|~1~|~1~|~01/S>2~|~District Wide Crack Sealing project on the Priority System for FY2015. Routes to be determined. (Approx. 100 lane miles). This Plansplit is for non-interstate Urban routes in the Cincinnati area 96315~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: WAY-241-0.00-2.72, 2.86-7.13 96315~|~1~|~2~|~02/STR~|~STP Rural Bridge Work 118432~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 101266~|~1~|~1~|~01/NHS/LOUI~|~Resurfacing STA SR 153 from 6.26 to 7.47, urban paving in the City of Louisville. 96479~|~1~|~1~|~01/SAF~|~Raised Pavement Marking project for FY2019. Various routes and sections in D10. Non federal aid project funded 100% state. 109503~|~1~|~1~|~01/CMQ~|~Construction of a parking lot near the Wellsburg Bridge at Brilliant, Ohio. 87251~|~1~|~1~|~01/STR~|~ADA SR41 0.00 - 7.46 Resurfacing ProjectBegin project at the Brown County line (SLM 0.00) to SR136 (SLM 7.46). It is proposed to resurface the highway with asphalt concrete.Pave thru brdgs:0100609 ADA SR41 0.48 Intersect: Sunnyvale Run0100633 ADA SR41 0.96 Intersect: Buttermilk Run0100722 ADA SR41 1.91 Intersect: Streambox Run0100757 ADA SR41 2.73 Intersect: Bradysville Run0100781 ADA SR41 3.22 Intersect: Blackpride Run0100838 ADA SR41 3.61 Intersect: Cranston Creek0100846 ADA SR41 4.29 Intersect: Richley Run0100870 ADA SR41 5.2 Intersect: Mussel Run0100900 ADA SR41 5.88 Intersect: Wounded Run80/20 split01/STR/PV State 87251~|~1~|~2~|~02/STR~|~ADA SR41 0.00 - 7.46 Resurfacing ProjectBrown County line to SR136. Brdg for Rehab:0100641 ADA SR41 1.02 Intersect: Big Three Mile Creek80/20 split02/STR/BR/State 90984~|~1~|~1~|~01/SAF~|~Various traffic control items & Dublin Granville bikepath from Morgan to Fordor 104995~|~1~|~1~|~01/NFP~|~D5 pavement marking (fast dry) plan in western D5 counties 124699~|~1~|~1~|~01/BRO~|~Bridge replacement. 76420~|~1~|~2~|~02/S>2~|~Federal/local (Columbus) urban pavingFRA-315C (Goodale St) SLM 0.00-1.0902/S>2/PV/ 76420~|~1~|~4~|~04/S>2~|~100% City items in urban paving section 76420~|~1~|~5~|~05/IMS~|~Work on structures FRA-315C-0.48 and FRA-315C-0.53L. Eligible for 90/10 Interstate funding 76420~|~1~|~3~|~03/NHS~|~Minor work (patching, sealing) on 6 bridges - federal/state funding 76420~|~1~|~1~|~01/NHS~|~Federal/state prority system minor rehabFRA-315: 0.00-2.3701/NHS/PV/ 101553~|~1~|~2~|~02/S<2~|~Preventive Maintenance Chip Seal: SLM 3.82 to 3.86 101553~|~1~|~1~|~01/STR~|~Preventive Maintenance Chip Seal: SLM 3.86 to 13.93 98045~|~1~|~2~|~02/S<2/DEL~|~STP < 200 80/20 Delaware UPUrban = 4.92 lane miles (33.7% x 20% = 6.7%)4.5-5.25.35-6.276.45-7.29 98045~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.00-4.50 121481~|~1~|~1~|~01/NHS~|~All items of work associated with FRA-104 resurfacing. 100364~|~1~|~2~|~02/STR~|~Overlay SR 41 with asphalt concrete CLA SR 41 SLM 24.90- 27.57 100364~|~1~|~1~|~01/S>2~|~Overlay SR 41 with asphalt concrete CLA SR 41 SLM 22.14 - 24.63 CLA SR 41 SLM 24.63 - 24.90 100364~|~1~|~3~|~03/S<2~|~Overlay on SR 235 SLM 1.51 to 3.95 on STP <200000 88352~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for use with federal BHF funds. 4301358 88352~|~1~|~2~|~02/NFP~|~100% local participation by AT&T for work on their facilities on the structure. 104794~|~1~|~1~|~01/NFP~|~Mowing on various routes 102823~|~1~|~1~|~01/NHS~|~Resurfacing on NHS system. 102823~|~1~|~2~|~02/S>2~|~Resurfacing on STP urbanized area. 102823~|~1~|~3~|~03/IMS~|~Resurfacing on interstate system 95437~|~1~|~2~|~02/IMS~|~For various bridges. 95437~|~1~|~1~|~01/IMS~|~HAN-75 from SLM 18.30 to 25.23 WOO-75 from SLM 0.00 to 3.01 86959~|~1~|~2~|~02/NHS/NIL2~|~100% City items on TRU SR 46 3.18 to 3.44 and 4.74 to 5.61. 86959~|~1~|~3~|~03/S>2/NIL1~|~80/20 Resurfacing costs for TRU SR 169 4.06 to 4.30 and 4.58 to 4.69. 86959~|~1~|~4~|~04/S>2/NIL2~|~100% City items on TRU SR 169 4.06 to 4.30 and 4.58 to 4.69. 86959~|~1~|~1~|~01/NHS/NIL1~|~80/20 Resurfacing costs for TRU SR 46 3.18 to 3.44 and 4.74 to 5.61 89297~|~1~|~1~|~01/S<2/LCEO~|~"01/S<2/OT/LCEO - County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP = $387,500.00 Total Federal dollars ($310,000.00 4B87 plus $77,500.00 Credit Bridge to make it 100% Federal up to the CAP) - Replacement of 4561708 LIC CR134 01.54 Intersect: ditch; Would be BR Eligible for Replacement: Length=23 SD/FO(1) SR=40.8 DSR=3 but being replaced by an 18' culvert 102876~|~1~|~1~|~01/IMS~|~Plan Split 01 created for IR routes 102876~|~1~|~2~|~02/NHS~|~Plan Split 02 created for IR routes 102876~|~1~|~3~|~03/S>2~|~Plan Split 03 created for STP > 200000 routes 102876~|~1~|~4~|~04/STR~|~Plan Split 04 created for STP Rural routes 120309~|~1~|~1~|~01/NHS~|~added plan split. 109313~|~1~|~1~|~01/SAF~|~Safety Plan Split 120018~|~1~|~1~|~01/SAF~|~Plan split for roundabout 111854~|~1~|~1~|~01/BRO~|~KYTC's share of the overlay project. 111854~|~1~|~2~|~02/BRO~|~OH's Share of the overlay project 121489~|~1~|~1~|~01/BRF~|~MAD CR 70 0.38 Rehab over Deer Creek 108290~|~1~|~1~|~01/STR~|~Emergency repair project. ROS-001ROS 772 10.30 93271~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rereplacement of 1602225 COS SR206 0.6 Intersect: Tributary Of Mohawk Creek; Not BR Eligible for Replacment: Length=30 SD/FO(0) SR=68.2 DSR=" " 117391~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 85006~|~1~|~1~|~01/MPO~|~Block fund event 89276~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for State STP funds 89276~|~1~|~2~|~02/NFP~|~100% local participation work items 110196~|~1~|~1~|~01/MPO~|~Resurfacing of Shuffel Street (CR-230) between Frank Avenue and Shuffel Avenue. 96694~|~1~|~1~|~01/NHS~|~Plan split to include work to replace the bridge size culvert and other roadway and associated work necessary to complete the project. 114380~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 93 12.16 (SFN 8201000) and VIN 324 3.21 (SFN 8202036). 121978~|~1~|~1~|~01/SAF~|~Plan Split for Safety funds 108350~|~1~|~1~|~01/NHS~|~Bridge painting project. GAL 35 5.47 L (SFN 2700859) and R (SFN 2700867). NHS route funded 80 federal/20 state. 108350~|~1~|~2~|~02/STR~|~Bridge painting project. VIN 124 2.26 (SFN 8201277) and VIN 160 8.49 (SFN 8201404). Rural other federal aid funded 80 federal/20 state. 101978~|~1~|~1~|~01/STR~|~Rural STP funds from CEAO. 80% federal SAC 4B77 with a 20% local match from Wyandot County SAC LNTP. All the work on CR 55, CR 134 and CR 142. The work on CR 119 from the Marion County line to the Upper Sandusky Urban Area boundary at 5.65. The work on CR 330 from SR 293 to the Upper Sandusky Urban Area boundary at CR 110 at 11.10. 101978~|~1~|~2~|~02/S<2~|~Urban STP funds from CEAO. 80% federal SAC 4B77 with a 20% local match from Wyandot County SAC LNTP. The work on CR 119 from the Upper Sandusky Urban Area boundary at 5.65 to SR 67. The work on CR 330 from the Upper Sandusky Urban Area boundary at CR 110 at 11.10 to the corporation limits of the City of Upper Sandusky at 11.64. 114148~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges 120160~|~1~|~1~|~01/S5K~|~Urban Paving 116941~|~1~|~1~|~01/S5K~|~Resurfacing 87719~|~1~|~1~|~01/NHS~|~NHS Smooth Seal: MED-18-2.61-2.69 87719~|~1~|~2~|~02/S>2~|~STP > 200000 Smooth Seal: LOR-252-2.77-5.55 87719~|~1~|~3~|~03/STR~|~STP Rural Smooth Seal: LOR-252-0.00-2.77 / MED-18D-0.00-0.08 / MED-83-2.60-4.26 / MED-83-12.85-15.05 101560~|~1~|~1~|~01/NHS~|~Repairs on three bridges 101560~|~1~|~2~|~02/NHS~|~Deck replacement and repairs on two structures 75467~|~1~|~2~|~02/CMQ~|~This split is for CMAQ eligibile pedestrain facilities. The CMAQ eligibility was approved March 28, 2011. 75467~|~1~|~1~|~01/SAF~|~This split is for safety impovements. It is the majority of the project. The split does not cover the pedestrain facilities. 85271~|~1~|~1~|~01/NHS~|~resurface WOO US 6 0.00-5.04; US-6 from County Line to SR-235 85271~|~1~|~3~|~03/NHS~|~Culverts on WOO-6 @ SLM 2.93, @ SLM 3.04, @ 3.09, @ 3.86, @ 4.43 85271~|~1~|~2~|~02/NHS~|~Bridge on WOO-6 @ SLM 1.35 122751~|~1~|~2~|~02/SAF~|~Safety funded scope to construct raised crosswalks and drainage improvements 122751~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope including resurfacing and sidewalk work 95996~|~1~|~1~|~01/BRO~|~SFN 8600279 Structural steel painting 98116~|~1~|~1~|~01/NHS/COLS~|~HNS Urban Paving Columbus SLM 12.36 to 15.99 98116~|~1~|~2~|~02/S>2/BEX~|~STP>200 Urban Paving Bexley SLM 15.99 to 16.84 98116~|~1~|~3~|~03/NHS~|~NHS Urban Paving Bexley SLM 16.84 to 17.57 117945~|~1~|~1~|~01/NFP~|~Fence installation and repair along various routes throughout District Four. 98510~|~1~|~1~|~01/NHS~|~Plan split for all work associated with the rehabitliation of bridge GRE-68-0960 and GRE-68-1340. 109343~|~1~|~1~|~01/NFP~|~ODNR project for culvert work in Shawnee State Forest. 99593~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work funded at 90% federal/20% state 85532~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all paving work on the NHS 89235~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 89235~|~1~|~2~|~02/S>2~|~100% local work such as curb ramps, etc. in Grand River Village. 89235~|~1~|~3~|~03/S>2~|~100% local work such as curb ramps, etc. in the City of Painesville. 115423~|~1~|~1~|~01/STR~|~Bridge replacement apart of the OBPP. 92393~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4202678 KNO SR95 10.96 Intersect: Trib Of E Br Kokosing Riv; BR Eligible for Rehabilitation: Length=60 SD/FO(1) SR=56.0 DSR=5 92393~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4203216 KNO SR541 2.74 Intersect: Tributary Of Harrod Run; Not BR Eligible for Replacement: Length=35 SD/FO(1) SR=70.9 DSR=8 86693~|~1~|~1~|~01/STR~|~Chip Seal 120845~|~1~|~1~|~01/BRF/GCEO~|~Guernsey County CEAO Federal/State Exchange Program Funding - 4C87 (80% State) / LNTP (20% Local Match) - Replacement of SFN 3030547 carrying over Leatherwood Creek 84605~|~1~|~1~|~01/STR~|~Bridge (length < 20') Construction/Repair (structure type is culvert) 96635~|~1~|~1~|~01/NHS~|~Redeck SFN 7700679 SUM SR 8 7.43 Pedestrian bridge over SR 8. 84821~|~1~|~1~|~01/BRF~|~Remove existing steel superstructure, widen existing abutments and place rock channel protection in fron of abutments. Place a prestressed, reinforced, non-composite concrete box beam deck superstructure. Complete all roadway approach work necessary for proper roadway geometrics on Wilson Road in Mercer County. SFN 5431441 MER CR 51 1845. 119123~|~1~|~2~|~02/NHS~|~Resurfacing. 119123~|~1~|~1~|~01/IMS~|~Resurfacing. 119123~|~1~|~3~|~03/S5K~|~Resurfacing 119123~|~1~|~4~|~04/STR~|~Resurfacing. 123017~|~1~|~1~|~01/S5K~|~Signals along US 62 in the City of Washington Court House from Glenn Ave to the US 62/US 22/SR 41 intersection 109360~|~1~|~1~|~01/STR~|~Culvert ReplacementROS 327 3.88 (CFN 1837174) 109278~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using asphalt overlay treatment. MOE 7 2.21-8.65. Major 2 funds. NHS route funded 80 federal/20 state. 90442~|~1~|~1~|~01/IMS~|~Culvert liner project on NOB 77 0519 (SFN 6100449) and NOB 77 0734 (SFN 6100473). Interstate route funded 90 federal/10 state. 82514~|~1~|~1~|~01/MPO~|~Franklin County sponsor, MORPC funded bridge deck replacementSFN 2532344, FRA-CR225-0.92, Lithopolis Winchester Rd over Little Walnut Creek 93421~|~1~|~1~|~01/SAF~|~City to add friction treatment to various locations to reduce wet pavement crashes 105203~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 105203~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span. 105203~|~1~|~1~|~01/STR~|~Resurfacing. 102532~|~1~|~1~|~01/BRO~|~Bridge replacement eligible for municipal bridge funding. 113905~|~1~|~3~|~03/STR~|~Bridge Rehabilitation on Resurfacing Project 113905~|~1~|~1~|~01/STR~|~Asphalt Concrete Resurfacing / Edge Repair HUR SR 4 00.00 to 6.05 113905~|~1~|~2~|~02/S<2~|~Asphalt Concrete Overlay / Edge Repairs HUR SR 4 6.05 TO 6.66. 113905~|~1~|~4~|~04/S5K~|~Fed / Local split for HUR-4-6.05 to 6.66 to include surface course, intermediate course, tack coat, prime coat, and compacted aggregate in area included in city limits 94200~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on all lanes of SR 756 in Clermont County from the intersection with SR 743 to the western corp. of Felicity. CLE SR 756: SLM 2.65 to 7.38 122799~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the roundabout 77826~|~1~|~1~|~01/STR~|~resurface Woo SR 199 1.78 to 6.24; ( RURAL ) section CR 84 Pelton Road to West Milgrove south corp line 77826~|~1~|~2~|~02/S<2/Fost~|~resurface WOO SR 199 0.35-1.78 ( URBAN-FOSTORIA ) ; from US 23 to CR 84 Pelton Road 118058~|~1~|~1~|~01/SAF~|~Improve the intersection of SR-235 & Byron Rd by constructing an EB SR-235 left turn lane, relocating the north leg of Byron Rd and cul-de-sac'ing the south leg of Byron Rd. 101995~|~1~|~1~|~01/NFP~|~Pavement Marking Work Order on various routes throughout District 4. 113337~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4CP7 (100% State) - No CAP - Ding-N-Dent Guardrail repair District Wide 109881~|~1~|~1~|~01/STR~|~2024 Operations Chip Seals 123524~|~1~|~1~|~01/STR~|~Plan split for conduit replacement and/or repair 96683~|~1~|~1~|~01/IMS~|~Districtwide mowing various routes. 85255~|~1~|~1~|~01/NHS~|~OTT-SR2 from SLM 14.90 to 18.38 (Rural) 124722~|~1~|~1~|~01/SAF~|~Install new/upgrade existing guardrail on various county roads in Clinton County. 98268~|~1~|~1~|~01/BRO~|~Replacement of SFN 6400515 (PER-13-19.64) 106662~|~1~|~2~|~02/NFA/COL~|~Crack sealing of loop road; 100% City. 106662~|~1~|~1~|~01/ENH~|~Construction of loop road sidewalk with brick gutter; ADA compliant. 95% federal/5% local. 94795~|~1~|~1~|~01/S<2~|~Shave and pave roadway, ADA Intersection improvements. SLM 2.968 to SLM 3.988 114470~|~1~|~1~|~01/STR~|~Resurfacing HAS-519 from SLM 6.78 to SLM 7.44 114470~|~1~|~2~|~02/NFA~|~Resurfacing HAS-519 from SLM 7.44 to US 250 119742~|~1~|~1~|~01/NFA~|~Creating Plan Split for TED Involvement 87341~|~1~|~1~|~01/IMS~|~Priority System resurfacing on BEL-70-5.04 to 7.61; includes asphalt overlay, pavement repairs and pavement marking. 95179~|~1~|~1~|~01/BRO~|~Bridge replacement project. NOB 821 11.66 (SFN 6105580).BR eligible funded 80 federal/20 state. 120270~|~1~|~1~|~01/S5K~|~Pedestrian and bicycle safety improvements within the City of Marietta. Work includes installation of bike racks, sidewalk improvements and crossing improvements. 115272~|~1~|~1~|~01/NHS~|~Construction of Type II Noise Barrier along US-422 at Harper Road. 101728~|~1~|~1~|~01/NHS~|~Two Year Construction Inspection Agreement to provide general and bridge inspection services District-wide. Estimated fee is $1.0M. 120499~|~1~|~1~|~01/NFA~|~Resurface fish hatchery 124660~|~1~|~1~|~01/SAF~|~CEAO HSIP funding for roundabout 106108~|~1~|~1~|~01/STR~|~DSR BEL-003 108042~|~1~|~1~|~01/NFP~|~Plan split for cracksealing 97843~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 0731692 107974~|~1~|~1~|~01/S>2~|~Culvert rehab 107974~|~1~|~2~|~02/STR~|~Culvert rehab 97701~|~1~|~1~|~01/IMS~|~Latex deck overlay. WAS 77 0135 L, SFN 8402973. Interstate route funded 90 federal/10 state. 92932~|~1~|~1~|~01/NFP~|~Culvert replacements on State Route 21, in Summit County, Ohio. 108815~|~1~|~1~|~01/BRO~|~Plan split to program project, update prior to plan submission. 88396~|~1~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items (guardrail removed for storage and Medina County Monument Box) 88396~|~1~|~1~|~01/MPO~|~Pavement widening, resurfacing 112771~|~1~|~1~|~01/IMS~|~Lighting replacements on Interstate routes in D8. 97845~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 3840174 96564~|~1~|~2~|~02/S>2/NEW2~|~Plan split for 100% Local Costs. 96564~|~1~|~1~|~01/S>2/NEW1~|~In the village of Newton Falls. 97290~|~1~|~1~|~01/IMS~|~"01/IMS/CV/ " - District Preservation Culvert Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Inserting culvert liners on; 1) Gue-IR 70-04.32; 2) Gue-IR 70-04.49; GUE-70-00.94, GUE-70-11.03, GUE-70-23.91, GUE-77-10.51 97290~|~1~|~2~|~02/STR~|~"02/STR/CV/ " - District Preservation Culvert Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Installation of culvert liner on Mus-SR 146-8.09; 124632~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation and replacement of existing Noise Wall 110718~|~1~|~1~|~01/NHS~|~Culvert Replacement BRO-52-15.71 107443~|~1~|~1~|~01/S<2~|~AC Overlay 107443~|~1~|~2~|~02/STR~|~AC Overlay 107443~|~1~|~3~|~03/NFA~|~Resurfacing 87695~|~1~|~1~|~01/NHS~|~Culvert Construction/Repair 121669~|~1~|~1~|~01/IMS~|~Replace deck overlay 79759~|~1~|~4~|~04/NHS~|~Culvert Liner for LOR-10-6.73 79759~|~1~|~1~|~01/IMS~|~ResurfacingLOR-480-0.97 to 2.17 79759~|~1~|~2~|~02/NHS~|~ResurfacingLOR-10-5.23 to 5.49LOR-10-6.25 to 6.53 79759~|~1~|~5~|~05/SAF~|~Plan Split 5/1 is 100% safety 4HJ7 for long line r-wr pavement marking optics and grooving. Plan Split 5/2 is 90%4PF7/10%4PS7 for the remaining long line pavement marking costs. 79759~|~1~|~3~|~03/IMS~|~Bridges: LOR-IR-480 01.051 LOR-IR-480 01.110 LOR-IR-480 01.150 LOR-IR-480 01.570 LOR-IR-480 01.710 LOR-IR-480 02.040 116189~|~1~|~1~|~01/STR~|~Bridge Replacement 124779~|~1~|~1~|~01/NHS/POLA~|~Install sidewalks and pedestrian enhancements. 88610~|~1~|~1~|~01/BRO~|~Structure rehab over Glen Echo SFN 2500698 - FRA 23-15.56 88610~|~1~|~2~|~02/BRO~|~Remove and replace bridge railing. City of Columbus to fund up to $150,000. 88610~|~1~|~4~|~04/BRO~|~Items requested by the City of Columbus to be paid 100% by Columbus 88610~|~1~|~3~|~03/BRO~|~Cost for items to be paid 100% Columbia Gas 118134~|~1~|~1~|~01/MPO~|~MPO STBG funding 119495~|~1~|~1~|~01/NFP~|~Plan split for Franklin County ding and dent guardrail on various routes. 118828~|~1~|~1~|~01/NHS~|~Plan split for work on SR 444 in Greene County. 92002~|~1~|~1~|~01/STR~|~ROS SR772 0.00 - 5.97 resurfacing projectOn SR772, it is proposed to resurface the highway beginning at Pike Co. line then north east for 5.97 miles and terminate 0.19 mile NE of SR162M (Hartwood) (SLM 0.00 to 5.97). 80/20 split01/STR/PV/State 89413~|~1~|~1~|~01/IMS~|~Maintenance Funds 4CP7 - District Wide contract 83406~|~1~|~2~|~02/IMS~|~Bridge work on ASD-511-10.60/ASD-071-05.27 83406~|~1~|~1~|~01/STR~|~Resurfacing 83406~|~1~|~3~|~03/STR~|~100% State Funds - 4PS7 for Jointbond product 118942~|~1~|~1~|~01/NFA~|~WAS-TR-55-0.05 SFN 8436665. Bridge Replacement. Funded 100% Federal. 111192~|~1~|~1~|~01/SAF~|~Extend the Wesleyan Bike Path. 105950~|~1~|~1~|~01/SAF~|~Traffic Signal Reconstruction within the City of Kettering. 112498~|~1~|~1~|~01/STR~|~AC overlay without repairs:MER-49 SLM 4.76 to 13.91AC overlay with repairs:MER-219 SLM 10.29 to 14.12 117502~|~1~|~1~|~01/BRF/HCEO~|~Replacement of the existing superstructure. 102972~|~1~|~1~|~01/STR~|~split 1 STP rural25-chipseal 111531~|~1~|~1~|~01/ENH~|~Preventative maintenance treatment by using a mastic seal on the pavement of the Hockhocking Adena Bikeway. Funded 95% Federal (TRC)/5% Local. 117983~|~1~|~1~|~01/BRF~|~Bridge replacement 102404~|~1~|~1~|~01/STR~|~microsurfacing 120054~|~1~|~1~|~01/SAF~|~Plan Split for SRTS funded scope. 117824~|~1~|~1~|~01/ENH/ODNR~|~Shared use path and separated pedestrian path to be constructed along the Main Loop Road low water crossing reconstruction project. 117824~|~1~|~2~|~02/NFP/ODNR~|~Plan split for ODNR cost to replace the Main Loop road low water crossing bridge. 113596~|~1~|~1~|~01/S>2~|~Resurfacing of South Dixie Highway from South Corporation Limit to RR Crossing in the City of Franklin. 112433~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - Plan Split 1 100262~|~1~|~1~|~01/NFP~|~Two year Construction Inspection task order. 122800~|~1~|~1~|~01/SAF~|~Pavement markings on various routes in Highland County. 114960~|~1~|~1~|~01/STR~|~Bridge Replacements 110634~|~1~|~1~|~01/NFA~|~District 9 construction inspection 110634~|~1~|~2~|~02/NFP~|~CEAO/ ODNR construction inspection 122141~|~1~|~1~|~01/NFP/CANT~|~School signs/flasher upgrades and sidewalk improvements. 106839~|~1~|~1~|~01/SAE~|~Install new and upgrade existing guardrail. 84021~|~1~|~2~|~02/NHS~|~Plan split for bridge work items 84021~|~1~|~1~|~01/NHS~|~80/20 funding split using federal NH funds. 107369~|~1~|~1~|~01/NFP~|~Restriping along various routes in D5. 101164~|~1~|~1~|~01/NHS~|~Overlay US 35 in Montgoery County with smooth seal: MOT US 35 SLM 19.28 to 21.20 116608~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items for FRA-270. 118002~|~1~|~1~|~01/STR~|~Bridge repair due to accident 90454~|~1~|~1~|~01/STR~|~Concrete bridge deck overlay project on MOE 537 0003 (SFN 5602912). 80/20% Federal/State. 94639~|~1~|~1~|~01/STR~|~Construct a high speed roundabout at the intersection of SR 41 (SLM 30.79) and SR 235 (SLM 31.17) 101114~|~1~|~2~|~02/NHS~|~Plan Split for Luc-2-18.62 AW Over the Maumee 101114~|~1~|~1~|~01/IMS~|~32 bridges 114674~|~1~|~1~|~01/NHS~|~Project to bridge BUT-4-1816 that carries SR 4 over the railroad and Dicks Creek and bridge BUT-4-1833 that carries SR 4 over SR 73 by replacing the wearing surface and performing other minor repairs. 101819~|~1~|~1~|~01/BRF~|~Guilford Blvd Bridge replacement. 102661~|~1~|~1~|~01/STR~|~Bridge Replacement: LOR-57-6.58 (SFN 4702476) 107505~|~1~|~1~|~01/STR~|~Resurfacing BEL-147 103805~|~1~|~1~|~01/NFA~|~The City is constructing Road improvements specifically extending Progress Drive 995' feet north of existing Commerce Drive. The street extension will be a 28' wide road including base and asphalt wearing course, with curb, gutter and storm sewer/with catch basins. 108858~|~1~|~1~|~01/NHS~|~Paint Insp. Task Order Contract for FY2019. 108858~|~1~|~2~|~02/NHS~|~Paint Inspection Task Order contract for FY2020 Part A. 108858~|~1~|~3~|~03/NHS~|~Paint Inspection Task Order Contract for FY2020 part B. 108858~|~1~|~4~|~04/NHS~|~Paint Inspection Task Order Contract for FY2020 part C. 108858~|~1~|~5~|~05/NHS~|~Paint Inspection Task Order contract for FY2021 Part D. 114788~|~1~|~1~|~01/STR~|~Rural plan split. 114788~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan split 108353~|~1~|~1~|~01/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of SFN 3000000 - Gue-US 22-25.63 carrying US 22 over Crab Creek. 111596~|~1~|~1~|~01/MPO~|~Federally eligible work 116508~|~1~|~1~|~01/IMS~|~Plan split for weigh station parking lot. 123968~|~1~|~1~|~01/S50~|~Resurfacing along CR 43 from Powells Lane to Industrial Park Road - 80% (4TA7/BH11) Federal funds/20% Local. 123832~|~1~|~1~|~01/SAF~|~Guardrail FY31 95989~|~1~|~2~|~02/STR~|~District Preservation Bridge Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP 95989~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP 95989~|~1~|~3~|~03/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on State rated Structure 104001~|~1~|~1~|~01/STR~|~Pavement work in the Village of Arlington including full depth repair. All funds are from the District Preservation Program. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. There are no local funds in this split. 104001~|~1~|~2~|~02/NFP/ARL~|~Non pavement work in the Village of Arlington including curb and gutter, drive approaches and storm drainage. This work in the responsibility of the Village of Arlington to pay for. They received an grant and a loan from the Ohio Public Works Commission (OPWC). Funds will be used in the following order. OPWC grant, OPWC loan, Non OPWC funds from the Village. 98499~|~1~|~1~|~01/BRO~|~Bridge rehabilition. District Preservation Program funds. 103264~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers. 108820~|~1~|~1~|~01/NFP~|~Replacing the linked culverts. 93257~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6403247 PER SR668 15.13 Intersect: Trib Of Somerset Creek; BR Eligible for Replacement: Length=25 SD/FO(1) SR=44.8 DSR=7 106348~|~1~|~1~|~01/NHS~|~Bridge Repair due to Accident 112405~|~1~|~1~|~01/SAF~|~Plans split for CEAO safety funds 98506~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 303 0.00 to 1.28 110663~|~1~|~1~|~01/STR~|~All costs for resurfacing on SR 108 in Putnam County from SR 15 to the Henry County Line. Federal and state funds from the District Preservation Program budget. No local funds. 96631~|~1~|~2~|~02/NHS~|~Replace raised pavement marker castings and/or lenses. All work on US 24 in Defiance and Paulding Counties, US 30 in Allen and Wyandot Counties, SR 12, SR 15 and US 68 in Hancock County and US 23 in Wyandot County. 96631~|~1~|~1~|~01/IMS~|~Replace raised pavement marker castings and/or lenses. All work on Interstate 75 in Allen County. 96631~|~1~|~4~|~04/NFP~|~Replace raised pavement marker casting and/or lenses. All work not covered by the Interstate, NHS or STP Rural plan splits. 96631~|~1~|~3~|~03/STR~|~Replace raised pavement marker casting and/or lenses. All work on SR 18, SR 49, SR 249 and US 127 in Defiance County. All work in Hancock County not in the NHS plan splits except US 224. All work on SR 235 in Hardin County. All work in Paulding County except on US 24. All work in Putnam County except US 224. All work in Van Wert County. 110279~|~1~|~1~|~01/NHS~|~Plan split for work on HAM-27 118628~|~1~|~1~|~01/S5K~|~Chip Seal 118628~|~1~|~2~|~02/STR~|~Chip Seal 91563~|~1~|~1~|~01/BRF~|~80% federal / 20% local using Municpal Bridge funds to replace the Old Rockside Road bridge over the Cuyahoga River in the City of Independence. 112870~|~1~|~1~|~01/NHS~|~FRA-33 from SLM 12.08 to 12.61 112870~|~1~|~2~|~02/S>2~|~FRA-62 from 27.17 to 27.32 and FRA-62G from 0.00 to 0.04 121868~|~1~|~1~|~01/NFA~|~Created for J&C involvement 88895~|~1~|~1~|~01/S>2~|~Resurfacing POR SR 303 from 4.98 to 6.10. 88895~|~1~|~2~|~02/STR~|~Resurfacing POR SR 303 from 6.10 to 8.72. 88895~|~1~|~3~|~03/S>2~|~not BR Eligible, 20ft+ structure, see linked bridge. 88895~|~1~|~4~|~04/S>2~|~not BR Eligible, 10' to 20' structure, see linked bridge. 88895~|~1~|~5~|~05/STR~|~Not BR Eligible, see linked structure > 20' 116004~|~1~|~1~|~01/NFA~|~Created for J&C involvement 116004~|~1~|~2~|~02/NFA~|~SIB Loan for the Village of Ottawa, max amount $257,443 116004~|~1~|~3~|~03/NFP~|~SIB loan for Village of Ottawa, max $257,443 107579~|~1~|~1~|~01/STR~|~Plan split for PRE-177 and PRE-725 107579~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 113557~|~1~|~1~|~01/STR~|~Settlement repair by pavement replacement and subgrade improvement. 117100~|~1~|~1~|~01/ENH/LCPD~|~"01/ENH/OT/LCPD" - plan split for construction of shared use pathway. 117100~|~1~|~2~|~02/ENH/LCPD~|~"02/ENH/OT/LCPD" - construction of pathway along rural section of route. 91339~|~1~|~1~|~01/STR~|~2 Lane Resurfacing from SR 309 to Sr 97 (SLM 0.00 to 6.82) 87823~|~1~|~1~|~01/SAF~|~ODOT Safety project to add turn lanes at Refugee/Chatterton Rd and Noe-Bixby RdLocal sponsor - FRA County Engineer 107208~|~1~|~1~|~01/ENH~|~5th Ave safety lighting in the City of Youngstown. 113882~|~1~|~1~|~01/NFA~|~Created for J&C involvement 100875~|~1~|~1~|~01/SAF~|~RPM contract for FY 2021. 100% State. 97157~|~1~|~1~|~01/NFA~|~Bridge replacement in the City of Massillon 98603~|~1~|~1~|~01/STR~|~Split for pavement work on GEA-6 and GEA 608 98603~|~1~|~2~|~02/NFA~|~Split for paving the Riveredge Maintenance Facility at 100% state funds 98603~|~1~|~3~|~03/IMS~|~Plan split for drainage work on I-77 98603~|~1~|~4~|~04/IMS~|~Split for pavement work on I-90 in Lake County 115721~|~1~|~1~|~01/SAF~|~Safety Funded 110357~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into a roundabout. 110357~|~1~|~2~|~02/NHS~|~Bridge work to HUR-20-1774 Deck Overlay with asphalt water proofing deep beam rail retrofit 117134~|~1~|~1~|~01/MPO/GCEO~|~Resurfacing of Federal Road from Old US 35 to Selma-Jamestown Road. 103942~|~1~|~1~|~01/STR~|~Pavement repair on SR 190. 107812~|~1~|~1~|~01/MPO~|~Resurfacing of Graham Rd from RR to Elm Rd within the City of Stow. 100284~|~1~|~1~|~01/NHS~|~Microsurfacing of TRU-SR 7 from 8.75 to 8.96 100284~|~1~|~2~|~02/STR~|~Microsurfacing of ATB US 6 from 20.61 to 23.17 and ATB US 6D from 0.00 to 0.06, ATB SR 7 from 2.37 to 7.44, ATB SR 85 from 0.00 to 1.32, TRU SR 7 from 9.32 to 12.64. 100284~|~1~|~3~|~03/S>2~|~Microsurfacing of TRU SR 7 from 8.96 to 9.32. 92729~|~1~|~1~|~01/MPO~|~Wooster Rd West CR 96 1.37 - 1.88 84878~|~1~|~1~|~01/BRO/PCEO~|~County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) Credit Bridge Available to make 95% Federal /15% CB/ 5% Local - See CAP Comments - Bridge replacement Moxahala Creek; BR Eligible for Replacement: 108682~|~1~|~1~|~01/SAF~|~Safety Plan Split 108682~|~1~|~2~|~02/NFP~|~Adding new part code per Madison Booth 121006~|~1~|~1~|~01/NHS/MONR~|~Plan split for the 80/20 items on the City of Monroe portion 121006~|~1~|~2~|~02/NHS/MONR~|~Plan split for the 100% City items on the City of Monroe portion 121006~|~1~|~3~|~03/NHS/MIDD~|~Plan split for the 80/20 items on the City of Middltown portion 121006~|~1~|~4~|~04/NHS/MIDD~|~Plan split for the 100% City items on the City of Middletown portion 101145~|~1~|~1~|~01/S<2~|~AC Overlay without repairs 111806~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at Sawmill Road and Presidential Parkway 117610~|~1~|~1~|~01/BRF~|~Bridge rehab. 95995~|~1~|~1~|~01/NHS~|~SFN 8701253 slope protection 121376~|~1~|~1~|~01/MPO/KENT~|~Pavement reconstruction. 121510~|~1~|~1~|~01/SAF~|~TSG & Lighting Maintenance 108986~|~1~|~1~|~01/IMS~|~Repair of noise walls on the Interstate system 118716~|~1~|~1~|~01/MPO/STPK~|~Resurfacing of the Stark Parks Hoover Trail. 102616~|~1~|~1~|~01/NFA~|~Construct an addition to existing CS pole building, and either replace roof structure of existing salt barn or construct new. 91420~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2021 103423~|~1~|~1~|~01/SAF~|~Construction of traffic signal. 109933~|~1~|~1~|~01/NHS~|~Flat Sheet sign replacement project in FY2025 GAL county. NHS routes. 109933~|~1~|~2~|~02/S5K~|~Flat Sheet sign replacement project in FY2024 GAL county. Urban routes. 109933~|~1~|~3~|~03/STR~|~Flat Sheet sign replacement project in FY2024 GAL county. Rural routes. 109933~|~1~|~4~|~04/NFA~|~Flat Sheet sign replacement project in FY2024 GAL county.. Not on the federal aid system routes. 109783~|~1~|~1~|~01/STR~|~AC Overlay with repairs 109783~|~1~|~2~|~02/NFA~|~AC Overlay without repairs 109783~|~1~|~3~|~03/NFA~|~To remove and replace failing thin lay asphalt. 100589~|~1~|~1~|~01/STR~|~LAW 243 (7.22-11.59)PIK 335 (7.90-14.55) 100589~|~1~|~2~|~02/NFA~|~LAW 218 (0.00-2.42) 100614~|~1~|~1~|~01/STR~|~Plan Split for the Rural portion of SR 122 in Preble County from SLM 19.04 - 24.45 119276~|~1~|~1~|~01/S>2~|~Replace FRA-605-2.69 structure (SFN 2516764) over Schleppi Run 118050~|~1~|~1~|~01/STR~|~Landslide repairs. 118633~|~1~|~1~|~01/NFA~|~Culvert replacement. 97962~|~1~|~1~|~01/STR~|~SR 274 SLM 15.24 to SLM 17.77 (OC 000) - Resurface the existing roadway with asphalt concrete (2.00 in) 98098~|~1~|~1~|~01/NHS/COLS~|~NHS Urban Paving Columbus SLM 23.04 to 24.31 98098~|~1~|~2~|~02/NHS~|~NHS Resurfacing 80/20 SLM 22.91 to 23.04; 24.31 to 24.47 117212~|~1~|~1~|~01/SAF~|~Installation of raised crosswalk and bump-outs on Harrison Ave at Ruehlman Place and on Central Ave at W 8th St. Includes new curb ramps and drainage improvements as needed. 117700~|~1~|~1~|~01/S>2~|~Installation of electric vehicle chargers 115991~|~1~|~1~|~01/NFA~|~Stabilization and repair of failed embankment. 101055~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay to TRU SR 46 from 18.45 to 23.64. 80492~|~1~|~1~|~01/S<2~|~Plan split for the portion of SR81 within the Urban Area boundary of Lima. This is from 19.16 to 20.21 on SR 81. 80492~|~1~|~2~|~02/STR~|~Plan split for the rural portion outside of the urban area of Lima. This is for SR 81 from 20.21 to 29.42 and on SR 65 from the South Corporation Limits of the Village of Cario at 13.75 to the north Corparation Limits of the Village of Cario at 13.90. 122155~|~1~|~1~|~01/CMQ~|~Citywide traffic signal replacement work at 35 locations using CMAQ funding. 123848~|~1~|~1~|~01/S5K~|~slide repair 111028~|~1~|~1~|~01/SAF~|~Repair landslide on Columbia Parkway. 108977~|~1~|~1~|~01/SAE~|~100% Safety Plan Split 9299~|~1~|~1~|~01/S>2~|~Unfunded plan split. This will be modified in the future when funding becomes available. 112493~|~1~|~1~|~01/STR~|~AC Overlay without repair 106959~|~1~|~1~|~01/NHS~|~Pavement work to include a SB entrance ramp and a NB exit ramp and a CD road from Sunbury Parkway to US36/SR37 exit. Also, Sunbury Parkway to Wilson Rd. and the extension of Wilson Rd to Sunbury Parkway. 106959~|~1~|~2~|~02/NHS~|~Structure over IR 71 as part of the interchange construction 97642~|~2~|~1~|~01/BRO~|~SFN 8758395 97642~|~3~|~2~|~02/BRO~|~SFN 8748985 87346~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - CAP = $421,000.00 - Slope stabilization at 1) MUS SR146 30.95-30.98; 2) MUS SR146 31.51-31.54; 3) MUS SR146 31.58-31.61 102748~|~1~|~1~|~01/STR~|~This plan split is for bridge repair on rural bridges. 98903~|~3~|~5~|~05/S<2~|~Minor bridge work 10' to 20' structure. 98903~|~1~|~1~|~01/NHS/CONN~|~Total pavement replacement of ATB US 20 from 23.02 to 23.75, in the City of Conneaut, Ashtabula County, Ohio. 98903~|~2~|~2~|~02/BRF~|~Miscellaneous bridge work to Center Street structure. 98903~|~3~|~4~|~04/NHS/CONN~|~100% City of Conneaut Items including full and partial depth repairs, manholes and catch basins reconstructed to grade and ADA curb ramps. 98903~|~3~|~3~|~03/NHS/CONN~|~Resurfacing of ATB US 20 from 21.86 to 23.02 and 23.75 to 25.93, urban paving in the City of Conneaut. 98903~|~1~|~6~|~06/NHS/CONN~|~100% Conneaut Items for manhole frames and covers. 98903~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment 98527~|~1~|~2~|~02/BRF~|~The bridge on SR 195 is on a Minor Collector. District Preservation Progam funds. 98527~|~1~|~1~|~01/BRO~|~The two bridges on SR 31 are on a Minor Arterial. District Preservation Program funds. 121497~|~1~|~1~|~01/S5K/ZANE~|~Mill and fill resurfacing of MR 350/903 within the City of Zanesville using Large City STP funds. 121497~|~1~|~2~|~02/S5K/ZANE~|~Enhancements including sidewalks, curbs and curb ramps along MR 350/903 within the City of Zanesville. 103933~|~1~|~1~|~01/ENH~|~Construct sidewalks along Garfield Street in the City of Struthers. 110693~|~1~|~1~|~01/IMS~|~Spot concrete slab repair on I-270 in Franklin County at various locations 124543~|~1~|~1~|~01/STR~|~Reconstruction 108881~|~1~|~1~|~01/NFP~|~The TOWNSHIP will reconstruct within the existing roadway and approximately 5,500 feet Lynn Road from west of State Route 44 to County Road 31 105082~|~1~|~1~|~01/NFP~|~Maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 122978~|~1~|~1~|~01/BRF~|~Plan Split for Municipal Bridge funded scope. 118582~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/CU 117791~|~1~|~1~|~01/BRO~|~Split for bridge repair work 110861~|~1~|~1~|~01/SAF~|~Safety Program Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - Upgrade of US 62 by widening for two way left turn lane and signal upgrade at US 62/Village Square Shopping Center. 13182~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1801740, 1801775 103197~|~1~|~1~|~01/NFP~|~Split for guardrail work 89022~|~1~|~3~|~03/CMQ/STA~|~Signal upgrades, Jackson Township, Stark County, Ohio. 89022~|~1~|~1~|~01/MPO~|~Addition of Center Turn Lane from RR tracks on Whipple Avenue to the intersection, and RR tracks on Everhard Road to the intersection. Includes new storm sewer, curb and gutter, culvert replacement, signing, and striping. Elimination of left turn movements, and access management. In Jackson Township, Stark County, Ohio. 89022~|~1~|~2~|~02/SAF~|~Safety funded items on Everhard Rd. and Whipple Ave. 109737~|~1~|~1~|~01/SAF~|~Construct a full-length (~800 ft) eastbound deceleration lane at the ramp to Interstate 71 northbound. Safety Application: 201810D03-04 90588~|~1~|~1~|~01/SAF~|~Pavement marking upgrade project funded with CEAO funds. 100% Federal. 105574~|~1~|~1~|~01/STR~|~RIC-SR-39 22.810 SFN 7002521 Over ROCKY FORK CREEKNew Construction Full Structure Replacement 98904~|~1~|~1~|~01/BRO~|~Replacement of Bridge No. WAR-CR 7-0846 (SFN: 8330441) which carries Wilmington Road over Gum Run. 116874~|~1~|~1~|~01/S>2~|~Resurfacing 106473~|~1~|~1~|~01/NFP~|~District wide construction inspection task order. 111625~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4. 103008~|~1~|~1~|~01/NFP~|~Install RPM's on various routes in District Six 119448~|~1~|~1~|~01/S50~|~Intersection project. 116287~|~1~|~1~|~01/NFP~|~Fence repair and maintenance on various routes throughout district 4. 93281~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) 3001539 GUE IR70 12.75 Intersect: I-70 Over Leatherwood Crk; Not BR Eligible for Rehabilitation: Length=172 SD/FO(0) SR=90.6 DSR=6; 2) 3001563 GUE IR70 12.75 Intersect: I-70 Over Leatherwood Crk; Not BR Eligible for Rehabilitation: Length=172 SD/FO(0) SR=90.6 DSR=6; 110894~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix on: MIA-41 SLM 11.70 to 12.90 99496~|~1~|~1~|~01/S<2~|~Slide Repair 98005~|~1~|~1~|~01/STR~|~Bridge Replacement 91128~|~1~|~2~|~02/STR~|~80/20 fund split for bridge replacement in the rural area using federal STP funds: 2801906; GEA-528-0749 & 2801957; GEA-528-0857 91128~|~1~|~3~|~03/S>2~|~80/20 fund split for bridge rehabilitation using federal urban STP funds. 4306279; LAK-608-03.03 91128~|~1~|~1~|~01/NHS~|~80/20 fund split for culvert replacement using NHS funds: GEA-306-13.45: CFN 283061345 93246~|~1~|~1~|~01/MPO~|~Repairs to existing bikeway and asphalt overlay on Wolf Creek Bikeway from the Montgomery/Preble County line to Albert Street in Brookville. 88646~|~1~|~2~|~02/IMS~|~SFNs: 8706573, 8706603, 8706638, 8706662 88646~|~1~|~1~|~01/IMS~|~WOO IR475 0.00-4.01 88857~|~1~|~1~|~01/STR~|~Bridge Replacement 88857~|~1~|~2~|~02/STR~|~HUR-601-01.85 sfn:3904474 / HUR-061-21.08 Culvert Replacements 92731~|~1~|~2~|~02/NHS/Perr~|~100% Local Funding for pavement repairs, curbs and curb ramps on SR 25. 92731~|~1~|~3~|~03/SAF~|~US-20 from SLM 0.26 to SLM 0.50 92731~|~1~|~1~|~01/NHS/Prbg~|~resurface WOO SR 25 21.81-22.57; resurface SR-25 from Perrysburg south corp line to US-20 119779~|~1~|~1~|~01/S5K~|~added plan split. 90775~|~1~|~1~|~01/SAE~|~01/SAE/OT/ This split is for traffic signals on the NHS system. All three signals in the project are in this split. The traffic signal at US 23 and CR 330 in Wyandot County is in this Plan Split because US 23 is on the NHS. The traffic signal at SR 65 and Bluelick Road in Allen County, and the traffic signal at US 224 and CR 140 in Hancock County, are in the split because MAP-21 added all Principal Arterials to the NHS. Funding is 100% federal funds as the work eligible for 100% safety funds. 102195~|~1~|~1~|~01/STR~|~ADA CR 10 1.42 ER Slide Repair. 92650~|~1~|~1~|~01/STR~|~Overlay SR 49 & SR 707 in Mercer County with fine graded aggregate:MER SR 49 SLM 9.36 to 13.91MER SR 49 SLM 21.45 to 26.59MER SR 707 SLM 0.00 to 11.29 88672~|~1~|~1~|~01/NHS~|~Resurfacing on a portion of HAM-27 including bridges over Great Miami River 79846~|~1~|~1~|~01/CMQ~|~Plan Split for Traffic Signals on TRU Warren Sharon/Howland Wilson 101312~|~1~|~1~|~01/STR~|~Resurfacing of PIC-56-22.02 to 33.93 and PIC-180-0.00 to 0.48 101312~|~1~|~2~|~02/S<2~|~Resurfacing PIC-56-20.66 to 22.02 101312~|~1~|~3~|~03/S<2~|~Resurfacing PIC-316-9.48 to 11.27 and 11.55 to 14.05 101312~|~1~|~4~|~04/S>2~|~Resurfacing FRA-674-0.00 to 1.99 101408~|~1~|~1~|~01/NHS~|~Plan split for the 80/20 split items on SR 4 (NHS). 101408~|~1~|~2~|~02/NHS~|~Plan Split for all 100% City items on SR 4 (NHS). 101408~|~1~|~3~|~03/NHS~|~Split for 100% ODOT work on SR 4 (NHS), outside City corp limits. 101408~|~1~|~4~|~04/S>2~|~Split for Urban Paving eligible work on non-NHS routes. 101408~|~1~|~5~|~05/S>2~|~Split for 100% City cost on non-NHS routes. 90201~|~1~|~2~|~02/IMS~|~90/10 fed/state split for all work using federal IM funds for the following structure: 1808516 (Wooster) 90201~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for work on the following structures using federal BR funds: 1808591 (Hilliard), 1808656 (Woodward), 1808575 (SR-237), 1808621 (McKinley), and 1808540 (Valley View). 93204~|~1~|~1~|~01/NHS~|~Crack sealing with minor pavement repairs on SR 49 from Third Street SLM 0.00 to SLM 1.08 within the City of Trotwood. 93204~|~1~|~2~|~02/NHS~|~Crack sealing with minor pavement repairs as needed on SR 49 from SLM 1.08 to SLM 2.77 (CSX Railroad Bridge) within the City of Dayon. 93204~|~1~|~3~|~03/NHS~|~Remove rubber joints and crack seal bridge. 102985~|~1~|~1~|~01/BRF~|~01/BRF/BR/JEF - Bridge replacement on County Road 53 1.46; 80% 4C87/20% LNTP. 108680~|~1~|~1~|~01/NFA~|~Bridge replacement project over Monday Creek. Woodlane Drive Bridge, SFN 0560000. Funded through the Municipal Bridge Program. Funded 95% Federal (80%/15% TRC) and 5% local. 115371~|~1~|~1~|~01/NFA~|~Created for J&C involvement 104741~|~1~|~1~|~01/NFA~|~The County will improve 800 feet of N. Blanchard Street starting at CR99 and heading in a southerly direction. 113269~|~1~|~1~|~01/SAE~|~Safety funded plans split 105707~|~1~|~1~|~01/SAF~|~plan split 116762~|~1~|~1~|~01/STR~|~Rural 125006~|~1~|~1~|~01/NFA~|~Pavement Marking. Hocking County. Funded 100% Federal. 116034~|~1~|~1~|~01/NHS~|~Install Vandal Protection Fencing on bridge carrying MR 197 (Jackson Street) over US 30 and remove the structure mounted signs to be reinstalled along the shoulder. 105252~|~1~|~1~|~01/NHS~|~Resurfacing on SR 7 from SLM 2.24 to 5.87 114282~|~1~|~1~|~01/IMS~|~Mowing contract - D8. 114282~|~1~|~2~|~02/IMS~|~Mowing contract - D7. Routes in Montgomery County 98018~|~1~|~1~|~01/NFA~|~J&C Funds for reimbursement to City of Marysville 105345~|~1~|~1~|~01/STR~|~AC overlay without repairs 100626~|~1~|~1~|~01/S<2~|~Resurfacing of BEL-7A with new sidewalks and curb 93897~|~1~|~1~|~01/SAF~|~Installation of RPM's at various locations within the district.100% state 107641~|~1~|~1~|~01/STR~|~Replace bridge ROS 180 4.54 (7104685) 86756~|~1~|~1~|~01/SAF~|~New Signal MED-003-09.53 107600~|~1~|~1~|~01/IMS~|~Rehab storm pipes 107600~|~1~|~2~|~02/NFA~|~Repair storm pipe 92362~|~1~|~1~|~01/STR~|~Resurfacing HEN SR18 17.43-20.62; Resurfacing Woo-582-0.00-5.34 123460~|~1~|~1~|~01/SAF~|~Safety improvements on Ohio River Rd. 102568~|~1~|~1~|~01/IMS~|~Plan split for roadway work on BUT-75 and included ramps 102568~|~1~|~2~|~02/NFA~|~Retroactive fuel adjustment 124812~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 150 over Short Creek by encasing pier piling. 100638~|~1~|~1~|~01/STR~|~Resurfacing HOL-83 from the COS Co. Line to US 62 and from Millersburg to Holmesville 92852~|~1~|~1~|~01/STR~|~ROS US50 37.05 Slide Repair On US50, project is 0.63 mile west of the Vinton County line. 01/STR/OT/State 83046~|~1~|~1~|~01/NHS~|~Resurfacing TRU SR 11 from 19.02 to 28.47 83046~|~1~|~2~|~02/NHS~|~Deck overlays and minor work to the linked structures > 20' span. 104164~|~1~|~1~|~01/NHS~|~Highway Lighting 119673~|~1~|~1~|~01/NFP~|~Culvert Replacement. 93827~|~1~|~1~|~01/BRO~|~Replace the existing structure (SFN 1862650) over the east branch of the Rocky River using 80% Municipal Bridge funds with 20% Local matching funds. 93827~|~1~|~2~|~02/NFP~|~100% local participation for sanitary and lighting work items. 121745~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing. 96403~|~1~|~1~|~01/NFP~|~New Brown County ODOT Garage 99629~|~1~|~1~|~01/STR~|~Split for all pavment work at 80% federal and 20% state 122120~|~1~|~1~|~01/BRF~|~replace existing deteriorated bridge (SFN 0933635) using design-build. widen approaches and update safety features. 93680~|~1~|~2~|~02/S>2~|~WOO-65-13.45 Culvert 93680~|~1~|~1~|~01/STR~|~WOO-65-5.63 and WOO-65-9.38 114978~|~1~|~1~|~01/STR~|~All work is in this plan split funded by district allocations using SACs 4PF7 (80%) and 4PS7 (20%). 112979~|~1~|~1~|~01/IMS~|~Rehabilitate bridge GRE-71-0150 that carries Smith Rd over I-71 by repairing the backwall and GRE-72-0029 that carries SR 72 over I-71 by replacing the deck and painting the structural steel. 117652~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 120026~|~1~|~1~|~01/NFP~|~added plan split. 97841~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 0730009 101948~|~1~|~1~|~01/NHS~|~Replacing linked structure. 119746~|~1~|~1~|~01/NFP~|~Creating plan split for TED involvement 111115~|~1~|~1~|~01/SAF~|~HSIP CEAO funding at 80% for intersection and sight distance safety improvements 98668~|~1~|~1~|~01/BRF~|~JAC CR29-8.73 (SFN 4031024) 114671~|~1~|~1~|~01/IMS~|~Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71 and bridge HAM-42-0235R which carries US 42 Northbound over I-71 Southbound, and bridge HAM-71-0822R that carries a ramp from Rdige Rd to Southbound I-71 over Northbound I-71. 83846~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7-0005 (100% State) - Annual contract for replacement of RPM's within District 5 on IR; US; and SR 119435~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs WAY-302-3.859 to 13.929 119435~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs WAY-302-3.82 to 3.859 94453~|~1~|~1~|~01/NHS~|~Replace supestructure on two continuous slab bridges - COL-11-1995L (SFN 1500937), COL-11-1995R (SFN 1500961), and provide new MSC overlay on two continuous slab bridges COL-11-2335L (SFN 1500996) and COL-11-2335R (SFN 1501054). The approach slabs on the two 1995 bridges will also be replaced where as a new overlay on the approach slabs will be provided on the 2335 bridges. 119120~|~1~|~1~|~01/NHS~|~Resurfacing. 102779~|~1~|~1~|~01/NHS~|~This plan split is for bridge on NHS route. 120341~|~1~|~1~|~01/IMS~|~All work associated with HAM-75-1192R bridge 120341~|~1~|~2~|~02/IMS~|~Plan split for the resurfacing on HAM-75 in the project 120341~|~1~|~3~|~03/IMS~|~Plan split for concrete patching on 3 bridges: Galbraith Rd, Clark St, and Davis St. 115824~|~1~|~1~|~01/S5K~|~Rehabilitation of Bridge SFN 1600427 93245~|~1~|~1~|~01/MPO~|~Reconstruction and widening from 2-5 lanes on CR 25A from Michaels Road to Evanston Road. Project will also install new curbs, ADA trncated dome handicapped access ramps, storm sewer system, utility relocations, street light, and restoration of traffic signage upgrades. 119755~|~1~|~1~|~01/SAF~|~Various pedestrian improvements at 6 locations across the City of Wilmington including sidewalk, high visibility crosswalks, RRFB's, curb bump-outs, and ADA curb ramps. 105937~|~1~|~1~|~01/MPO~|~resurfacing work eligible for federal-aid 105937~|~1~|~2~|~02/NFP~|~Split for 100% local funding 86945~|~1~|~1~|~01/STR~|~Plan Split for STA SR 183 0.00 to 3.50 86945~|~1~|~2~|~02/STR~|~Plan Split for SFN 7605609 STA-SR 183-03.26 over Big Sandy Creek 93363~|~1~|~1~|~01/SAF~|~Project includes replacing existing non-standard guardrail and installing new guardrail where needed. Berm work will be performed and guardrail will be added where vertical drop-offs are a concern. 119223~|~1~|~1~|~01/IMS~|~Mowing in District 8 120996~|~1~|~1~|~01/NHS~|~Plan split for pavement work on HAM-125 100387~|~1~|~1~|~01/IMS~|~SUM IR 271 from 0.00 to 2.33. 100387~|~1~|~2~|~02/S>2~|~SUM SR 21 from 19.57 to 20.77. 113628~|~1~|~1~|~01/NFA~|~Created for J&C involvement 122850~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 93323~|~1~|~2~|~02/NHS/CAMB~|~"02/NHS/PV/CAMB" - District Preservation Urban Paving in City of Cambridge - 4PF7 (80 Federal) / LNTP (20% Local Match) - No CAP - Resurfacing of SR 209 within project limits to be provide per ODOT urban paving at 80/20 93323~|~1~|~1~|~01/ENH/CAMB~|~"01/ENH/OT/CAMB" - Enhancement Program Funding 4B37 (80% Federal) / LNTP (20% Local Match) - CAP at $300,000.00 Federal Funding) - City of Cambridge project that includes Ehancements along Southgate Parkway from Wheeling Avenue to the south end of Southgate Parkway bridge. Enhancements include the installaton of new sidewalks lighting and landscaping. 99659~|~1~|~1~|~01/NFP~|~Raised Pavement Markers maintenance contract district wide. 102470~|~1~|~1~|~01/S<2~|~Resurfacing COL-267 120611~|~1~|~1~|~01/STR~|~All work included in this plan split. 121261~|~1~|~1~|~01/S>2~|~Resurfacing. 121261~|~1~|~2~|~02/STR~|~Resurfacing. 98385~|~1~|~1~|~01/STR~|~Chip Seal of ATB SR 46 from 0.00 to 15.02 and TRU SR 46 18.45 to 23.64. 113403~|~1~|~1~|~01/SAF~|~Split for ramp widening using safety funds 113403~|~1~|~2~|~02/BRO~|~Split for bridge widening work 101433~|~1~|~1~|~01/NHS~|~NHS AC Overlay without Repairs 101433~|~1~|~2~|~02/S<2~|~S<2 Overlay without Repair 102234~|~1~|~1~|~01/NHS~|~Widening SR 14 between Diagonal Road and Portage Pointe Drive in the City of Streetsboro. 102234~|~1~|~2~|~02/NHS~|~Portage County waterline replacement. 102234~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 108702~|~1~|~1~|~01/NFA~|~Replace Etna Street bridge over Mason Run in City of Whitehall 108702~|~2~|~2~|~02/NFA~|~Replace Elbern Ave bridge over Turkey Run in City of Whitehall 97246~|~1~|~1~|~01/S<2~|~Pavement reconstruction with the City of Greenville. Project includes pavement reconstruction, curb and gutter, sidewalk, curb ramps, signing and pavement markings. 107556~|~1~|~1~|~01/SAF~|~Systematic replacement of signs in Fayette and Pickaway counties. Other plan splits may be needed depending on routes and locations involved. 118564~|~1~|~1~|~01/IMS~|~Slope repair at the I-76 and Porter Rd structure, NW quadrant. 106333~|~1~|~1~|~01/STR~|~Bridge Replacement ? Presstress box beam bridgeRIC-SR-96 16.580 SFN (7005474) WHETSTONE CREEK Major Rehabilitation ? Deck replacement (004) New Construction ? Superstr repl (003) 100264~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.0M. 121604~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 146 11.79 (1809504). Rural other federal aid funded 80 Federal/20 State. 77305~|~1~|~1~|~01/BRO~|~01/BRO/BR/ Work to replace the bridge. The federal funds are BR funds from CEAO. 77305~|~1~|~3~|~03/NFP~|~100% locally funded esthetic items that were determined to be not eligible for federal funds. Funds provided by Allen County. 77305~|~1~|~2~|~02/CMQ~|~02/CMQ/OT/ CMAQ eligible work. CMAQ eligibility was approved March 20, 2012 for "the construction of a roundabout at the intersection of Shawnee and Ft. Amanda Roads as well as the constructon of sidewalks and a shared use path." The MPO-CMAQ funds SAC 4TB7 should be used before the MPO-STP funds SAC 4TA7. 99709~|~1~|~1~|~01/NFP~|~Epoxy pavement markings along various routes throughout District Four. 91762~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 78 9.18-15.05. Rural other federal aid funded 80 federal/20 state. 111993~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2026. 89265~|~1~|~1~|~01/NHS~|~Split for eligible paving work. 89265~|~1~|~2~|~02/NFP~|~Split 2 for work not eligible for urban paving funds. 116956~|~1~|~1~|~01/NFA~|~Culvert replacement project. MRG SR 376 14.60 (CFN 1845391). Not on any federal aid system. 89182~|~1~|~1~|~01/MPO~|~ OKI Project includes the addition of auxiliary turn lanes, sidewalk along the east side of Montgomery Road, and signing and traffic signal modifications. Montgomery Rd: Pfeiffer Rd to Bethesda North Hospital main access; Pfeiffer Rd: approx. 1 mi W of Montgomery Rd to Montgomery Rd 117996~|~1~|~1~|~01/BRF/CTID~|~Replacement of the superstructure of Bridge CLE-CR 54-2.16 (SFN: 1358154). 118336~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at WAY-585-02.73/Geyers Chapel Rd 105584~|~1~|~1~|~01/NFP~|~Bridge Painting 122080~|~1~|~1~|~01/IMS~|~Plan Split to replace portion of conduit 116868~|~1~|~1~|~01/ENH/HUDS~|~Construction of a multiuse trail. 93107~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Fai-SR 188-16.02 to 16.53; 2) Fai-SR 188-16.74 to 17.01; 3) Fai-SR 188-17.30 to 19.05; 93107~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Fai-SR 188-19.05 to 24.53; 93107~|~1~|~2~|~02/S<2/LANC~|~ District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - CAP (See Project CAP Comments) - Urban Paving resurfacing with related work on: 1) Fai-SR 188-16.53 to 16.74; 2) Fai-SR 188-17.01 to 17.30; 93107~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on: 1) Fai-SR 188-24.53 to 26.53; 92681~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete on DAR SR 118 from SLM 16.61 to SLM 17.67 at DAR/MER County Line. 104840~|~1~|~1~|~01/NFP~|~Split for traffic signal work 116491~|~1~|~1~|~01/S5K~|~Created for J&C Involvement 93802~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - Bridge Strike Funding 4SR7(100% State) - CAP of $147,273.22 - Repair of 6002730 MUS SR60G 00.32 Intersect: IR 70; BR Eligible for Rehabilitation: Length=211 SD/FO(2) SR=74.9 DSR=5 93802~|~1~|~2~|~02/NFP/ZANE~|~"02/NFP/OT/ZANE" - City of Zanesville - 4BG7 (100% Local) - Sidewalk repair on the State Street Bridge (Mus-SR 60G-00.32) over IR 70 in the City of Zanesville. - CAP District Preservation of $911.00 ($828.18 - 4PS7-005 and $82.82 State Labor) 89693~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work in this project using MPO Enhancement funds. 117987~|~1~|~1~|~01/BRF/KCEO~|~Replacement of bridge on KNO CR 9 1.05 (SFN 4230272). 123536~|~1~|~1~|~01/IMS~|~conduit linked 123536~|~1~|~2~|~02/NHS~|~conduit linked 93014~|~1~|~1~|~01/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Resurfacing with related work on the Priority portion of Mus-SR 16-06.41 to 11.58 93014~|~1~|~2~|~02/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Resurfacing with related work on the General portion of Mus-SR 16-11.58 to 11.74 93014~|~1~|~3~|~03/NHS~|~"03/NHS/BR/ " - No Cap - 80% Federal (4PF7)/20% State (4PS7) - deck sealing and related activities; installation of MSE wall between forward and rear abutments at MUS-16-7.69 L and R (SFNs 6000118 and 6000347). 105450~|~1~|~1~|~01/STR~|~AC Overlay with Repairs 105450~|~1~|~2~|~02/STR~|~Bridge work to determined later. 112606~|~1~|~1~|~01/ENH~|~Add new sidewalks along SR 193 and Warren Sharon Rd in Vienna Township. 94808~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 0.00 to SLM 0.26 110674~|~1~|~1~|~01/S>2~|~Resurfacing. 96329~|~1~|~1~|~01/STR~|~On US62 it is proposed to resurface the highway with asphalt concrete begining at the Brown County line and heading west for 10.38 miles. 106663~|~1~|~1~|~01/ENH~|~Work to enhance the pedestrian access in downtown Olmsted Falls that qualifies for federal-aid 100631~|~1~|~1~|~01/STR~|~Chip sealing of CAR-171 and CAR-542 96516~|~1~|~1~|~01/S<2~|~Resurfacing of STA US 62T from 0.00 to 0.60 and 1.73 to 4.40 eastbound, 0.00 to 1.08 and 2.35 to 4.40 westbound. 94349~|~1~|~1~|~01/NFA~|~Bridge replacement project on MEG 143 15.36, SFN 5302552. Not on the federal aid system funded 80 federal/20 state. 90234~|~1~|~1~|~01/CMQ~|~"01/CMQ/OT/Steu" - In Steubenville, improve the intersection of Lover?s Lane/Fort Steuben Dr by possibly installing a roundabout, including full depth pavement replacement on Lovers Lane and improving the approach on Fort Steuben Drive. Project includes curbs, sidewalks, curb ramps, pavement markings. Limits are from Preston Rd to ~800? north of intersection. 110127~|~1~|~1~|~01/S<2~|~PIC-188-2.57 to 2.88 110127~|~1~|~2~|~02/STR~|~PIC 188 from 2.88 to 8.03, MAD-323 location, PIC-138 location, PIC-361 location and UNI-37 Location 110127~|~1~|~3~|~03/NFP~|~FAY-753 location 88737~|~1~|~1~|~01/STR~|~Polyester Pavement Markers added throughout the District on various locations 85369~|~1~|~1~|~01/NHS~|~80/20 federal/local split for all Urban Paving eligible work. 85369~|~1~|~2~|~02/NHS~|~100% local participation items of work such as curb ramps, etc. 124907~|~1~|~1~|~01/S>2~|~Shared use path on Davidson Road from Raindrop Way to Trueman Boulevard. 124907~|~1~|~2~|~02/S>2~|~Shared use path on Davidson Road from Raindrop Way to Trueman Boulevard. 119068~|~1~|~1~|~01/MPO~|~sidewalk on Poole Road from Cheviot to Colerain Ave. 112500~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work at 100% Local cost for resurfacing work from Daisy Lane to the South Russell west corporation line. 112500~|~1~|~1~|~01/MPO~|~Plan Split for MPO-funded eligible work for resurfacing Washington St. from Daisy Lane to SR-306. 84868~|~1~|~1~|~01/IMS~|~90/10 IM funding for replacing existing pavement and for widening shoulders (80% of pvmt costs) 84868~|~1~|~3~|~03/IMS~|~90/10 IM funding for bridge rehab on 4 structures (10-20'):SFN 2507048 FRA-71-6.00 Harris RunSFN 2507064 FRA-71-7.85 Patzer DitchSFN 2507072 FRA-71-9.00 Mulberry RunSFN 2507129 FRA-71-9.11 Grove City Creek 84868~|~1~|~4~|~04/IMS~|~90/10 IM funding for bridge replacement (no added capacity) on 2 structures:SFN 2507080 FRA-71-9.03L White RoadSFN 2507110 FRA-71-9.03R White Road 84868~|~1~|~2~|~02/NHS~|~80/20 NHS funding for adding third lane in median (20% of pvmt costs - 12/60) 84868~|~1~|~5~|~05/NHS~|~80/20 NHS funding for adding capacity on 2 structures:SFN 2507080 FRA-71-9.03L White RoadSFN 2507110 FRA-71-9.03R White Road 84868~|~1~|~6~|~06/IMS~|~Payment to contractor for using 4D model 105460~|~1~|~1~|~01/S>2~|~Plan split for 674 bridge in Columbus 91831~|~1~|~1~|~01/IMS~|~Work on DEL-71, FRA-71, FRA-270, and MRW-71 91831~|~1~|~2~|~02/STR~|~Work on FAY-22-10.98 to 17.36, FAY-38-0.00 to 0.81, FAY-38-1.72 to 8.95, MAD-161-1.32 to 3.62, MAD-42-13.43 to 24.64, and MAD-42-9.86 to 12.35 91831~|~1~|~3~|~03/S<2~|~Work within Washington C.H. Urban Area. FAY-22-10.47 to 10.98 91831~|~1~|~4~|~04/S<2~|~Work within the London Urban Area. MAD-42-9.19 to 9.86 91831~|~1~|~5~|~05/S>2~|~Work within the Columbus Urban Area. FRA-161-0.00 to 0.83 84623~|~1~|~3~|~03/NHS~|~NHS Bridge deck overlay 80/20 Fed/State FAY-35-2.58 L/R and FAY-35-6.42 L/R 84623~|~1~|~1~|~01/NHS~|~NHS pavement resurfacing, FAY-35: 0.00-11.95 84623~|~1~|~2~|~02/NHS~|~8 structures for NHS bridge funding (not BR eligible):2400227 FAY US35 2.58 Intersect: Over Rattlesnake Creek2400359 FAY US35 6.43 Intersect: Over Milledgeville-Octa2400383 FAY US35 2.58 Intersect: Over Rattlesnake Creek2400448 FAY US35 6.43 Intersect: Over Milledgeville-Octa2400790 FAY CR12 9.44 Intersect: Over Ford Rd/Sugar Creek2400839 FAY CR11 11.84 Intersect: Over Palmer Rd.2400898 FAY CR11 11.84 Intersect: Over Palmer Rd.2400928 FAY CR12 9.44 Intersect: Over Ford Rd/Sugar Creek 117408~|~1~|~1~|~01/SAF~|~Safety improvements of SR 605 114943~|~1~|~2~|~02/S>2/STRE~|~Resurfacing, urban paving in the city of Streetsboro. 114943~|~1~|~1~|~01/NHS/SRTE~|~Resurfacing, urban paving in the city of Streetsboro 114060~|~1~|~1~|~01/S<2~|~Plan split for federally eligible construction expenses. 114060~|~1~|~2~|~02/STR~|~Plan split for 100% locally funded items and over cap costs 83137~|~1~|~4~|~04/STR~|~Rural Guardrail upgrade/replacement. WAS 550 11.24-19.70. 80% Federal and 20% State. 83137~|~1~|~3~|~03/S<2~|~Urban area for Guardrail replacement. 80% Federal/20% State. 83137~|~1~|~2~|~02/NHS~|~NHS system guardrail replacement. 80% Federal/20% State. 83137~|~1~|~1~|~01/SAE~|~Replace Type A end assemblies in various locations on Project. 100% Federal Safety Funds. 119876~|~1~|~1~|~01/BRF~|~Plan split for bridge replacement work. 119876~|~1~|~2~|~02/BRF~|~Plan split for non-eligible work at 100% local cost. 114816~|~1~|~1~|~01/S<2~|~STP<2 plan split. 114816~|~1~|~2~|~02/STR~|~Rural plan split. 108179~|~1~|~1~|~01/STR~|~ER event - repair landslide that occurred along SR 123. 98042~|~1~|~1~|~01/NHS~|~NHS Pavement 80/20 SLM 11.85 to 12.01 98042~|~1~|~2~|~02/S>2~|~STP Pavement 80/20 SLM 12.01 to 12.79 95803~|~1~|~1~|~01/NHS~|~WOO-20 101239~|~1~|~1~|~01/STR~|~Resurfacing of SR 163 and SR 19. 110618~|~1~|~2~|~02/S>2/COP~|~City of Powell Plan Split: DEL-750-2.26-3.87 110618~|~1~|~3~|~03/S>2~|~100% City of Powell Plan Split 110618~|~1~|~4~|~04/S>2~|~Replacement of DEL-750-4.188 storm sewer conduit 110618~|~1~|~1~|~01/S>2~|~Urban Area Plan Split: DEL-750-2.17-2.26, 3.87-4.22 105035~|~1~|~1~|~01/STR~|~All work associated with the construction of the park & ride. 100356~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 87741~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 100353~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 96660~|~1~|~1~|~01/IMS~|~Plan split for bridges WAR-71-0757L/R, WAR-71-0841L/R and WAR-71-1371 including any incidental roadway work for WAR-71-1371 in this plan split. 89255~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 92741~|~1~|~1~|~01/NHS~|~Placement of concrete barriers for rockfall hazard funded by GSM program. ATH 33 9.10-9.25. 80% Federal and 20% State. 96310~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation on 6004148 MUS SR93 15.19 122162~|~1~|~1~|~01/S5K/MVER~|~SRTS - sidewalks in the City of Mount Vernon / Knox County. 104428~|~1~|~1~|~01/SAF~|~plan split 104428~|~1~|~2~|~02/SAF~|~100% local funded items 121102~|~1~|~1~|~01/IMS~|~Construction 100656~|~1~|~1~|~01/S>2~|~Plan Slit for the seciosn with the large urbanized area on GRE-380. This is between SLM 6.38-6.93 100656~|~1~|~2~|~02/STR~|~Plan Split for the rural portions of GRE-380 between SLM 0-6.38 115351~|~1~|~1~|~01/MPO/CLIN~|~Resurfacing. 101384~|~1~|~1~|~01/NFP~|~Tree removal/pruning District 8. 85279~|~1~|~1~|~01/CMQ~|~Construction of a roundabout at Mathews/Sheridan Road intersection 85279~|~1~|~2~|~02/ENH~|~Landscaping and decorative component of roundabout. 83852~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7 (100% State) - Annual contract for placement of Fast Dry Striping within District 5 on IR; US; and SR 104148~|~1~|~1~|~01/NFP~|~Guardrail 122330~|~1~|~1~|~01/STR~|~Plan Split to program project. Update during project scoping. 96274~|~1~|~1~|~01/IMS~|~District Allocation 90/10 - Bridge Sealing - IR 71 Structures in Richland County. 98386~|~1~|~3~|~03/STR~|~See linked structures > 20' span. 98386~|~1~|~4~|~04/STR~|~See linked structures 10' to 20' span. 98386~|~1~|~5~|~05/NHS~|~See linked structures > 20' span. 98386~|~1~|~6~|~06/S>2~|~See linked structure 10' to 20' span. 98386~|~1~|~2~|~02/S>2~|~Resurfacing STA SR 43 from 8.88 to 9.03. 98386~|~1~|~7~|~07/S>2~|~See linked structure > 20' span. 98386~|~1~|~1~|~01/STR~|~Resurfacing STA SR 43 0.00 to 8.88 98386~|~1~|~8~|~08/SAF~|~Construction of centerline rumble strips. 86822~|~1~|~1~|~01/NHS~|~Bridge replacement project. GAL 7 1954, SFN 2700484. NHS route funded 80 federal/20 state. 96286~|~1~|~1~|~01/STR~|~Brdg Replacement3602672 SR134 14.43 86771~|~1~|~1~|~01/NFP~|~D11 Roof Replacement 109131~|~1~|~1~|~01/NFP~|~Split for bridge maintenance work - non-federal 123634~|~1~|~1~|~01/STR~|~Plan Split for STP Rural 102908~|~1~|~2~|~02/S5K~|~WIL-34 from SLM 14.385 to 15.72 102908~|~1~|~1~|~01/STR~|~WIL-34 from SLM 13.28 to 14.385 and WIL-191 107230~|~1~|~1~|~01/IMS~|~Split for interstate lighting upgrade work 107230~|~1~|~2~|~02/NHS~|~Split for NHS freeway lighting upgrade 100465~|~1~|~1~|~01/NHS~|~Gap project to repair composite and flexible pavement joints on LAW 52 18.00-22.16 and LAW 7 0.00-0.20. 100465~|~1~|~2~|~02/SAF~|~LAW 52 18.00-22.16 Safety funding to add microsurfacing to multiple locations along route. 123547~|~1~|~1~|~01/NFP~|~D09 DS FY2030 93203~|~1~|~1~|~01/NHS~|~Crack sealing with partial depth repairs to be performed at the approaches to the signalized intersections as needed from the CSX Bridge (MOT SR 49 2.77) to Salem Avenue (SLM 5.26) 123250~|~1~|~1~|~01/S5K~|~Traffic Signal Maintenance 123250~|~1~|~2~|~02/NHS~|~Traffic signal replacement. 121015~|~1~|~1~|~01/STR~|~plan split to program project. 107648~|~1~|~1~|~01/NHS~|~Rehabilitate structures JEF-7-2059 & JEF-7-2084. Replace superstructure for bridge JEF-7-2059 (SFN 4101111), rehabilitate abutments by replacing slab seat. Replace deck on existing continuous steel beam bridge JEF-7-2084 (SFN 4101146) and convert abutments to semi-integral. 107648~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 97632~|~1~|~1~|~01/NFA~|~Replacement of SFN 7842597 TRU County Line Turnpike Road (TR-204) bridge over Dead Branch and bring up to current design standards. 101371~|~1~|~1~|~01/IMS~|~Clean expansion joints, beam seats, and drainage systems for numerous priority route bridges in Hamilton County. 101371~|~1~|~2~|~02/NHS~|~Bridge sealing on NHS routes. 101371~|~1~|~3~|~03/S<2~|~Bridge Sealing on urban bridges. 109642~|~1~|~1~|~01/SAF~|~Safety Committee Funds - 4ZHJ7 (90% Federal) / 4BC7 (10% State) -See CAP Comments - Microsurfacing to improve friction performance on Gue- IR 70 from SLM 23.9 to 24.6. 120497~|~1~|~1~|~01/NHS~|~Repair Bridge Hit 112085~|~1~|~1~|~01/NFA~|~Replace structure > 20' span. 92145~|~1~|~2~|~02/S>2~|~80/20 fund split for bridge using federal STP funds: 4301684, 4301714, 4301803, 4301838 92145~|~1~|~3~|~03/NHS~|~80/20 fund split for bridge using federal NH funds: 4301382, westbound SR-2 over SR-283. 92145~|~1~|~1~|~01/BRO~|~80/20 funding split for federal BR eligible structures: 4301412, 4301471, 4301447, 4301536, 4301501, 4301595, 4301560, 4301897, 4301927. 86321~|~1~|~1~|~01/MPO~|~Construct a bikepath along the East side of Steve Whalen Blvd, complete the curb and sidewalk along the West side of the street including ADA compliant ramps. 100375~|~1~|~1~|~01/STR~|~Various routes. 23051~|~1~|~2~|~02/S>2~|~All work on the STP system, basically the ramps from SR-237 and SR-17. 23051~|~1~|~1~|~01/NHS~|~All work done on the NHS system from Snow Rd to SR-17. 100455~|~1~|~1~|~01/SAF~|~Reconstruction of six traffic signals, installation of a new traffic surveillance camera, addition of street lights to the traffic signal poles where necessary fiber optic cable and splices will be replaced and installed underground. 109029~|~1~|~1~|~01/ENH~|~Sidewalk Project 116697~|~1~|~1~|~01/NHS~|~NHS Plan Split 123507~|~1~|~1~|~01/STR~|~Landslide repair. 99626~|~1~|~1~|~01/SAF~|~Along State Route 164 add a SB auxilary lane South of the interchange to just South of the State Route 626 intersection; addition of a southbound LTL on State Route 164 at the State Route 626 south junction; conversion of the State Route 626 North junction to a multilane roundabout; Beaver Township, Mahoning County, Ohio. 99626~|~1~|~2~|~02/IMS~|~Widening and replacement of SR-164 structure (SFN#5029783) over the Ohio Turnpike, Beaver Township, Mahoning County, Ohio. 97952~|~1~|~1~|~01/STR~|~SR 559 SLM 7.36 to SLM 11.81 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in). 97952~|~1~|~2~|~02/NFA~|~SR 559 SLM 12.01 to SLM 12.62 (ZR 000) - resurface the exisiting roadway with asphalt concrete (2.00 in) 102410~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 84557~|~1~|~2~|~02/IMS~|~This split is for work to modify the interchange ramps. 84557~|~1~|~4~|~04/NHS~|~Work on US 224 outside the 400 feet of approach work by the bridge. No local funds. 84557~|~1~|~3~|~03/ENH~|~This split is for work for Transportation Enhancement (TE) eligible activities including the construction of sidewalks. 84557~|~1~|~1~|~01/BRO~|~This Split is for work to replace the bridge including approach work of up to 400 feet in each direction. Work done under this split is eligible for federal BR funds. 101872~|~1~|~1~|~01/NHS~|~NHS Bridges 101872~|~1~|~2~|~02/STR~|~Major Collector and Minor Arterial bridges. 79366~|~1~|~2~|~02/NFA~|~Three sided culvert on Meeker Way over Dry Run Branch 79366~|~1~|~1~|~01/SAF~|~Work on SR 315/US 23 and Stratford Rd US 23 intersections. Construction of Meeker Way. All work except culvert under Meeker Way. 83644~|~1~|~1~|~01/STR~|~80/20 funding split for the RURAL portion of the project using federal STP funds. This section is the first 0.59 miles of the project. 83644~|~1~|~2~|~02/S>2~|~80/20 funding split for the URBAN portion of the project unsing federal STP funds. This split will be used for all work after the first 0.59 miles. 122176~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-70-A- MOT 118625~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV 104942~|~1~|~1~|~01/MPO~|~Retrofit existing traffic signal heads at 26 signalized intersections within the City of Reading, OH with LED signal heads. Existing pedestrian heads will be retrofitted with LED lenses. Existing school flashers will be replaced. Battery backup systems will be installed at six intersections. 104942~|~1~|~2~|~02/SAF~|~Items to be paid by the Local - City of Reading. 93954~|~1~|~1~|~01/S<2~|~City of Bryan SR-2 and SR-34 (High St) from Town Line Rd to CR1575. 121544~|~1~|~1~|~01/IMS~|~Block PID for resurfacing interstate ramps. 116274~|~1~|~1~|~01/S5K~|~Sidewalk repair with ADA upgrades on ATH 682 4.70-6.18. 116274~|~1~|~2~|~02/SAF~|~Addition of 3 RRFB's to be added to ATH 682 in The Plains. Work locations include 4th Street, Elm Street and Pine Street. Safety Funded 100% Federal. 103062~|~1~|~1~|~01/NHS~|~Mill and resurfacing of Airport Access Road 103062~|~1~|~2~|~02/NHS~|~Bridge rehab on SB airport access road bridge 93597~|~1~|~2~|~02/S>2~|~Remove and replace pipe, headwall, and the removal of catch basins and manhole on State Route 725 at the intersection of Union Road SLM 10.11. 93597~|~1~|~1~|~01/IMS~|~Repair of medin catch basins along Interstate 75 from milepost 49.7 to Milepost 51.3 (SLM 8.78 to 10.38) 99480~|~1~|~1~|~01/STR~|~JAC 327 SLM 0.00 to 6.08 99480~|~1~|~2~|~02/STR~|~JAC SR 327 (0.00 to 6.08)SFN 4003306 (0.77)SFN 4003330 (1.73)SFN 4003357 (3.82) 124300~|~1~|~1~|~01/S>2~|~Reconstruct roadway & add pedestrian path 92499~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement project 104496~|~1~|~1~|~01/MPO~|~plan split 123622~|~1~|~1~|~01/STR~|~Plant Split for STP Rural 118999~|~1~|~1~|~01/BRF/MACE~|~Bridge replacement. 112572~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items in construction and CE using 4TA7 (NOACA) funds 103160~|~1~|~1~|~01/S>2~|~Reconstruction and enhancement of portion of SR 571 in Tipp City. 91565~|~1~|~1~|~01/BRF~|~80/20 funding split for bridge work eligible for federal local bridge funds. 77442~|~1~|~1~|~01/NHS~|~Resurfacing/Pavement Prmy Sys/Bridge Maintenance/Guardrail 77525~|~1~|~1~|~01/NHS~|~Plane and PaveCRA-030-09.53 to RIC-030-04.07 77525~|~1~|~2~|~02/NHS~|~Pavement marking - 100% 4MP7 (State pavement marking funds) 102345~|~1~|~1~|~01/STR~|~Test pavement sections on VIN 50 3.00. 105128~|~1~|~1~|~01/NFA~|~Construct an industrial access road of two 12-ft. lanes from Commerce Drive to the south an estimated 1800 LF within the alignment of an existing narrow, old mostly gravel road. 82134~|~1~|~1~|~01/NHS~|~Phase 3 of the reconstruction of the IR275/SR32 interchange. Primarily westbound ramps from SR32 from Eastgate Blvd and to IR275. 107918~|~1~|~2~|~02/IMS~|~Interstate Plan Split: FRA-270 107918~|~1~|~1~|~01/NHS~|~NHS Plan Split 107918~|~1~|~3~|~03/S<2~|~Urban Area (STP<200000) Plan Split 107918~|~1~|~4~|~04/STR~|~Rural Plan Split 107918~|~1~|~5~|~05/S>2~|~Urban Area (STP>200000) Plan Split 109850~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster Large City Funds with TRC - 4TA7 (Federal 80%) /LNTP(TRC15%) / LNTP (Local 5% ) - No CAP - Resurfacing with related work on Fai-CR 54-04.90 East Fair Avenue 100941~|~1~|~1~|~01/BRF~|~SFN 8753164 79974~|~1~|~2~|~02/STR~|~CO CC Rural plan split. All brdgs are pave thru.US35 10.20 - 13.77002/STR/PV/State 79974~|~1~|~1~|~01/S<2~|~CO CC 01 Urban plan split. All brdgs are pave thru.US 35 13.770 - 14.4101/S<2/PV/State 114954~|~1~|~1~|~01/STR~|~Bridge Replacement 89180~|~1~|~1~|~01/MPO~|~ Project involves the addition of a left turn lane and bike path for 1.25 miles on Kings Island Drive: from 500' S of the Brandt Connector to 500' N of the north entrance to Kings Island Theme Park. In addition, existing traffic signals will be upgraded and interconnected, and signs and pavement markings will be replaced to better define lane utilization. 98008~|~1~|~1~|~01/STR~|~Bridge Replacement 118812~|~1~|~2~|~02/CMQ~|~Construction of sidewalks, curbs, and gutters. CMAQ eligible work included in this split. 118812~|~1~|~1~|~01/S50~|~Resurfacing work on Robb Avenue 101066~|~1~|~2~|~02/S<2~|~Overlay various routes with fine graded aggregate: CHP SR 54 SLM 10.29 to 10.66 101066~|~1~|~1~|~01/STR~|~Overlay various routes with fine graded aggregate: CHP US 36 SLM 19.48 to 22.33 = = CHP SR 54 SLM 8.28 to 10.29 = = CHP SR 245 SLM 17.06 to 20.02 = = CLA SR 41 SLM 28.45 to 31.28. 104835~|~1~|~1~|~01/STR~|~Resurfacing project using 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7 from the District Preservation Program budget. There are no local funds. 90188~|~1~|~2~|~02/MPO/WFar~|~Relocation/replacement of West Farmington waterline. 90188~|~1~|~1~|~01/BRO~|~BR Eligible: replacement of SFN 7807597 18.87 SR534 over flow grand river. SFN 7807627 18.92 SR534 over grand river. 102033~|~1~|~1~|~01/NHS~|~Intersection of Monroe and Talmadge 97243~|~1~|~2~|~02/S<2~|~PIK SR 552 0.00 to 1.75 97243~|~1~|~1~|~01/S<2~|~PIK SR 552 0.50 & 0.59 124695~|~1~|~1~|~01/STR~|~Bridge replacement. 123544~|~1~|~1~|~01/NFP~|~added plan split for PM B 108635~|~1~|~1~|~01/NFP~|~The current manufacturing facility is located on Hickory Street and expansion plans would require the Village to upgrade the existing sanitary, storm sewer and roadway systems that currently service the facility from Clay Street. Additionally the Village will be required to widen of US 33 inside the Village limits to provide for safe semi-truck turning movements at new access points into the plant from US 33 108635~|~1~|~2~|~02/NFA~|~N/A 113111~|~1~|~1~|~01/STR~|~On CR 44 pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program and 100% (LNTP) Local funds. 120814~|~1~|~1~|~01/NHS~|~Culvert Maintenance. 112571~|~1~|~1~|~01/SAF~|~Signal plans split 120700~|~1~|~1~|~01/NHS~|~Smooth Seal. 92319~|~1~|~1~|~01/NFP~|~Facilities 107399~|~1~|~1~|~01/S5K/ZANE~|~Resurfacing with related work on MUS-666 in city of Zanesville 107399~|~1~|~3~|~03/S5K~|~Major Rehabilitation Funding (5MT7/4MT7) of Mus-SR 666-2.019 to 4.854 107399~|~1~|~4~|~04/NFA~|~Major Rehabilitation Funding (4MT7) FDR treatment on MUS-666-4.854 to 14.165 107399~|~2~|~5~|~05/S5K~|~Replacement of MUS SR 666 3.58 (SFN 6006485) 107399~|~1~|~2~|~02/S5K~|~Resurfacing with related work outside of city and major rehab limits. 121287~|~1~|~1~|~01/MPO/SUCE~|~Install new roundabout. 98275~|~1~|~1~|~01/NHS~|~NHS Non-Interstate 103482~|~1~|~1~|~01/BRO~|~Work eligible for Municipal Bridge funding for the rehabilitation of E. 116th Street bridge over GCRTA tracks. 117706~|~1~|~1~|~01/BRO~|~District Preservation Program funds. 104684~|~1~|~1~|~01/BRO~|~Bridge replacement project using 95% Municipal Bridge/5% Local; 95% 4R87/5% LNTP. 121626~|~1~|~1~|~01/S>2~|~Reconstruct roadway & improve bike / pedestrian facilities 102292~|~1~|~2~|~02/NHS~|~Resurfacing SR 7 within the City of Columbiana including asphalt overlay and pavement markings. 102292~|~1~|~1~|~01/NHS~|~All work associated with the asphalt resurfacing of SR 7 outside of the corporation limits of the City of Columbiana. 102292~|~1~|~5~|~05/S<2~|~Asphalt resurfacing work on SR 14 from SLM 8.72 (bridge) to the corporation limit at SLM 8.89. 102292~|~1~|~3~|~03/S<2~|~Resurfacing SR 14 (excluding SLM 8.72 to 8.89), SR 46 and SR 164 within the City of Columbiana including asphalt overlay and pavement markings. 102292~|~1~|~4~|~04/S<2~|~Work associated with new curb ramps and auxiliary pavement markings to be paid 100% by the City of Columbiana. 85349~|~1~|~1~|~01/ENH/ZANE~|~"01/ENH/OT/ZANE" - Enhancement Funding 4B37 (80% Federal) / 4BG7 (20% Local) - CAP 4B37 of $1,000,000.00 Federal - City of Zanesville Enhancement Project which includes new curbs and sidewalks, installation of utility trench for street light wiring, installation of decorative street lights and installation of new curb ramps. 85349~|~2~|~2~|~02/S<2/ZANE~|~"02/S<2/PV/ZANE" - Local Funding City of Zanesville STP funds 4TA7/ZA05 (80% Federal) / 4BG7 (20% Local) - No CAP - Resurfacing of Fifth Street Mus-CR 2020-00.00 to 00.50 (IR 70 Exit 154 off ramp to South Street) 110888~|~1~|~1~|~01/BRO~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 99384~|~1~|~1~|~01/NHS~|~L & B - MINOR NEW CONSTRUCT Funding LBP7 (100% State) - Construction of a pole building for a salt storage building at the existing Utica outpost. 104927~|~1~|~1~|~01/NFA~|~Johnson Trucking truck replacement project 102836~|~1~|~1~|~01/NHS~|~Micro surfacing NHS Routes 102836~|~1~|~2~|~02/S>2~|~Micro surfacing STP > 200k routes 102836~|~1~|~3~|~03/STR~|~Micro surfacing STP Rural routes 103055~|~1~|~1~|~01/S>2~|~Mill and resurfacing of township road. 106597~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - Knox County Engineer project to replace bridge Kno-TR401-1.35 (SFN 4237048) using Federal/State Exchange Program with state max of $1,903,373 funded at 95% 105391~|~1~|~1~|~01/STR~|~Smooth seal on rural route: SHE SR 29 SLM 22.37 to 26.23 96285~|~1~|~1~|~01/STR~|~Bridge replacement 4402529 LAW SR -141 12.870 198.0 91841~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on COL-170 and COL-165; includes asphalt overlay, pavement repairs, pavement marking 81710~|~1~|~1~|~01/NHS~|~BRO SR32 5.28 - 8.15 & 8.15 - 11.34, & HIG 0.00 - 0.39 ResurfacingOn SR32, begin project 0.36 miles east of the US68 ramp (SLM5.80), head west and terminate at it's intersection with SR134 (SLM 11.34). Project includes HIG SR32 0.00 - 0.39. It is proposed to maintaine & preserve the pavement by making the necessary repairs & by overlaying the existing pavement w/asphalt concrete.80/20 split 103057~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 724 1.44. 98302~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair contract 105778~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid 87668~|~1~|~1~|~01/NHS~|~Enbankment slide repair of Lightner Rd bridge over SR-2 in Ottawa County @ SLM 26.35. 93199~|~1~|~1~|~01/STR~|~General system paving of MRW-314: 4.02-20.02 119840~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 22 0.00-2.99. Funded 100% State. 109310~|~1~|~1~|~01/ERD~|~Reconstruction of Erie Street eligible for federal earmark funding 77242~|~1~|~1~|~01/IMS~|~LUC IR75 1.99-2.34 77242~|~1~|~2~|~02/BRO~|~4803000 LUC IR75 1.99 Intersect: Nebraska Ave 4803094 LUC IR75 2.34 Intersect: Indiana Ave 4805496 LUC SR246 5.84 Intersect: Ir 75 98347~|~1~|~1~|~01/SAF~|~Lighting project on various routes and sections in D10 for FY2017. 114302~|~1~|~1~|~01/NHS~|~All the slide repair work is in this project is in this plan split. Federal and state funds from the GSM program. After the GSM cap is reached funds will come from the District Preservation Program budget. 84409~|~1~|~1~|~01/BRO~|~Replace existing supestructure on Bridge No. HAS-519-0220 (SFN 3402878) with new box-beam superstructure 93528~|~1~|~1~|~01/BRF~|~SFN 6232027 OTT-CR19-4.70 108391~|~1~|~1~|~01/MPO~|~Widening on local road in the City of Huber Heights. 111185~|~1~|~1~|~01/STR~|~Replace structure with 10' to 20' span. 115177~|~1~|~1~|~01/STR~|~Culvert Replacement 98282~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - plan split 01 for Lic-16-1593L/R 120312~|~1~|~1~|~01/ERD/SUCE~|~Chip seal and pavement repairs. 99736~|~1~|~1~|~01/SAF~|~Replace and upgrade various guardrail runs in various locations in Darke County. 95451~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities 4MA7/005 (100% State) - No CAP - Construction of new salt dome and pole building at Lic-SR 161-08.45 at the SR 161 & SR 37 Interchange. 122316~|~1~|~1~|~01/NFA~|~Plan split to program project. Update when scope is complete 96149~|~1~|~1~|~01/NFP~|~Construction of a new 1000 pound salt dome on new property in Butler County. 113444~|~1~|~1~|~01/IMS~|~Safety Program - 4HJ7 (100% Federal) - See CAP Comments - application of recessed and wet reflective pavement markings on LIC-70, and MUS-70. 113444~|~1~|~2~|~02/NHS~|~Safety Program - 4HJ7 (100% Federal) - See CAP Comments - application of recessed and wet reflective pavement markings on COS-36. 113444~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 124069~|~1~|~1~|~01/ENH/STPK~|~Bridge replacement. 94913~|~1~|~1~|~01/SAF~|~Saefty funding to provide turn lanes and signal improvement on Georgesville at Holt and Automall Drive 106770~|~1~|~1~|~01/SAF~|~install Qwick Kurb 104169~|~1~|~1~|~01/IMS~|~Concrete pavement repairs along Interstate 80 between the Ohio Turnpike and State Route 46, Mahoning County, Ohio. 93929~|~1~|~1~|~01/NFP~|~Pavment Markings (A) 119337~|~1~|~1~|~01/IMS~|~Resurfacing. 102817~|~1~|~1~|~01/STR~|~STP Rural pavement 102817~|~1~|~2~|~02/STR~|~STP rural bridges 102817~|~1~|~4~|~04/S<2~|~S<2 Bridge Sen 101 1.72 102817~|~1~|~3~|~03/S<2~|~Sen 101 1.64 to 2.33 102817~|~1~|~5~|~05/STR~|~Culvert CFN 1843576 80125~|~1~|~2~|~02/STR~|~Replace existing 3' X 2' X 38' long concrete box with 24" X 55' long conduit, Type A on US 62 at SLM 2.52. Replace existing 3' X 3' X 70' long concrete box with 42" X 64' long conduit, Type A on US 62 at SLM 3.84. Replace existing 4' X 3' X 32' long concrete box with 6' X 4' X 76' long concrete box on SR 60 at SLM 7.63. Replace existing 3' X 3' concrete box on SR 83 in Holmes County at SLM 4.45 with a new 3' X 3' concrete box. 80125~|~1~|~3~|~03/S<2~|~Replace existing 24" X 93' long CMP with 24" X 100' long CMP on COL 154 at SLM 5.62 80125~|~1~|~1~|~01/NFA~|~Replace existing 84" X 72' long sectional plate conduit with an 84" X 80' long conduit, Type A on BEL 26 at SLM 3.76 115755~|~1~|~1~|~01/S>2~|~This work will cover all work associated with the new bridge construction 115755~|~1~|~2~|~02/S>2~|~This plan split will cover all work associated with roadway improvements and new roadways approaching the new bridge 124931~|~1~|~1~|~01/NFA~|~Resurfacing project on MRG CR 4 0.00-6.404. Funded 80 Federal/20 Local. 117206~|~1~|~1~|~01/S5K~|~Primary plan split for new sidewalk. 97281~|~1~|~1~|~01/SAF~|~FY2018 District wide raised pavement markers. 124744~|~1~|~1~|~01/SAF~|~installation of new guardrail and rehab of current guardrail on various county roads 100050~|~1~|~1~|~01/NFP~|~Split for all work associated with the bridge repair 104657~|~1~|~1~|~01/MPO~|~Resurfacing Mahoning Ave from Meander Reservoir Bridge to Meridian Rd in Austintown Township, Mahoning County, Ohio. 83249~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete under the urban paving program on MER SR 29 0.00 to 0.310. 106495~|~1~|~1~|~01/NFA~|~Encase Pier piles, replace approach guardrail and provide rock Channel protection on two ODNR owned bridges in Barkcamp BEL-1SP-0041(SFN 0726117) and BEL-1SP-0051 (SFN 0726184)) 93890~|~1~|~1~|~01/S>2~|~Reconstruction of Tallmadge Avenue (SR-261) between Dayton Street and State Route 8. Includes pavement replacement, curb, sidewalks, signals. In the City of Akron, Summit County, Ohio. 91848~|~1~|~1~|~01/STR~|~Genereal system chip seal on various routes 98740~|~1~|~1~|~01/IMS~|~?01/IMS/OT/ ? - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on Interstate routes in Coshocton, Muskingum, and Guernsey Counties. 98740~|~1~|~2~|~02/NHS~|~?02/NHS/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS routes in Coshocton, Muskingum, and Guernsey Counties. 98740~|~1~|~3~|~03/S<2~|~?03/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes in Coshocton, Muskingum, and Guernsey Counties. 98740~|~1~|~4~|~04/STR~|~?04/STR/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routes in Coshocton, Muskingum, and Guernsey Counties. 98740~|~1~|~5~|~05/NFA~|~?05/NFA/OT/ ? - District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes in Coshocton, Muskingum, and Guernsey Counties. 109040~|~1~|~1~|~01/NFA~|~Landslide repair 107983~|~1~|~1~|~01/SAE~|~Repair a landslide that occurred along Shawnee Run Road as a result of an ER event. 102822~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 50 11.68 (SFN 0501484), ATH 50 14.23 (SFN 0501549), ATH 50 16.81 L (SFN 0501611) and R (SFN 0501638). NHS route funded 80 federal/20 state. 102822~|~1~|~2~|~02/S<2~|~Bridge painting project. ATH 682 2.14 (SFN 0504742). Urban other federal aid funded 80 federal/20 state. 102822~|~1~|~3~|~03/STR~|~Bridge painting project. ATH 144 14.06 (SFN 0503304). Rural other federal aid funded 80 federal/20 state. 97513~|~1~|~1~|~01/NFP~|~Costs for sign installation only 110089~|~1~|~1~|~01/IMS~|~FRA 70 from 15.5 to 19.37 110089~|~1~|~2~|~02/NHS~|~DEL 23 from 7.41 to 7.6, DEL 23 from 9 to 9.14, UNI 42 from 0 to 0.11 110089~|~1~|~3~|~03/S>2~|~DEL 750 from 4.21 to 4.43, FRA 40 from 4.33 to 4.39 110089~|~1~|~4~|~04/S<2~|~FRA 62 from 1.3 to 1.63, MAR 95 from 17.18 to 17.19, MAR 309 from 18.79 to 18.8 110089~|~1~|~5~|~05/STR~|~MRW 229 from 5.78 to 5.97 106124~|~1~|~1~|~01/S>2~|~Reconstruction in the City of Dayton on Salem Ave from Superior Ave to Riverview Ave, to include new street pavement curb, sidewalk, lighting and catch basins. 117322~|~1~|~1~|~01/ENH~|~Upgrade of sidewalks, curbs, curb ramps and crosswalks. Includes the installation of bus stop shelters in the City of Nelsonville. Locations include Fayette Street, Jefferson Street, Watkins Street and Chestnut Street. TAP funded project 80% Federal/15% TRC/5% Local. 95438~|~1~|~1~|~01/STR~|~On SR348 from 12.80 to 18.69 & on SR728 from 0.00 to 1.93, it proposed to resurface the highway.Project Termini: 0.23 mile east of TR118 east to US23 Pave Thru7306164 0.02 mill & fill under RR bridge7306199 0.257306172 1.537305664 13.017305680 17.7680/20 95438~|~1~|~2~|~02/STR~|~Bridge rehab7305796 17.517305826 18.04 88317~|~1~|~1~|~01/ENH~|~Project involves the enhancement of the intersection of Dayton-Xenia Road and Grange Hall Road through the installation of decorative lighting, brick pavers, and landscaping in the City of Beavercreek. 91885~|~1~|~1~|~01/NFP~|~District 10 Office elevator upgrade project. Task Order Agreement No. 16170, PID 88230. Non federal aid project funded 100% state. 91885~|~1~|~2~|~02/NFP~|~Facilities Split 99733~|~1~|~1~|~01/MPO~|~CMAQ Signal Improvements at 250 locations. 99733~|~1~|~2~|~02/MPO~|~Loacl construction funding for 250 signals. 119533~|~1~|~1~|~01/IMS~|~Added a split for bridge work 100608~|~1~|~1~|~01/STR~|~Asphalt overlay of HAS-151 and JEF-151 100608~|~1~|~2~|~02/STR~|~Pavement repairs within the former Village of Smithfield, funded with state Oil & Shale funds. 104607~|~1~|~1~|~01/S>2~|~Replacing linked structure > 20' Span. 99622~|~1~|~1~|~01/SAF~|~Construct Southbound left turn lane on State Route 534 at the intersection of Clay Street (CR15). Harpersfield Township, Ashtabula County, Ohio. 125024~|~1~|~1~|~01/S50~|~Sidewalk extension, utilizing 100% BOM 4TB7/CMAQ funding. 107711~|~1~|~3~|~03/BRO~|~Plan Split for locally funded aesthetic improvements on the WOO-65-2339 bridge 107711~|~1~|~1~|~01/STR~|~WOO-64-5.89 & WOO-65-6.18 bridges - Non-Federal 107711~|~1~|~2~|~02/BRO~|~WOO-65-23.39 bridge - Federal 113449~|~1~|~1~|~01/NHS~|~Install bump outs to delineate existing parking areas and repair broken curb, walk, curb ramps and driveways. the project will also add pedestrian lighting in the City of Dayton. 83629~|~1~|~1~|~01/CMQ/Warr~|~Install left turn storage lanes at Coit Road intersection, intersection realigning intersection, and bank driveway. Install TWLTL from Southern Boulevard to Coit Road. Resurfacing of TRU US 422 from 9.34 to 9.62, in the City of Warren, Trumbull County, Ohio. 87292~|~1~|~1~|~01/NHS~|~Resurfacing TRU SR 11 from 12.60 to 19.02. 87292~|~1~|~2~|~02/NHS~|~See linked structures >20' span. 76786~|~1~|~1~|~01/IMS~|~Plan split for interstate resurfacing work at 90% fed, 10% state 76786~|~1~|~2~|~02/NHS~|~Split for resurfacing work on the NHS at 80/20 fed/state 75645~|~1~|~1~|~01/S>2~|~Repair Bridge No. HAM-22-0740, SFN: 3100871. Bridge carries US 22 over I.O. Railroad. 119969~|~1~|~1~|~01/MPO/BEAV~|~Plan split for MVRPC STP funded portions of the project with a 40% local match. 102599~|~1~|~1~|~01/STR~|~This project is to cover the federally mandated sign upgrades for rural curves on two lane roads. 105853~|~1~|~1~|~01/IMS~|~Added plan split. 122103~|~1~|~1~|~01/BRF~|~Bridge rehab 114607~|~1~|~1~|~01/STR~|~Overlay on HIG 50. 112809~|~1~|~1~|~01/CMQ~|~Plan split 1 for pedestrian accommodations and curb ramp upgrades using CMAQ funds. 112809~|~1~|~2~|~02/SAF~|~Plan split for traffic signal modifications and controller cabinet upgrades. 94671~|~1~|~1~|~01/NFA~|~Replace twin concrete eliptical culverts due to deterioration on SFN 4602358 LOG 273 0296.. 91802~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing with asphalt concrete in Troy on SR 55 from Nashville Road (SLM 8.21) to the beginning of 4 lane (SLM 9.07) on SR 55 from Franklin Street (SLM 11.62) to Stauton Road (SLM 12.06) and SR 41 from SR 55 (SLM 9.46) to Cherry Street (SLM 9.51) under the Urban Paving Program. 91004~|~1~|~1~|~01/SAF/stow~|~Adding sidewalk connectivity at four locations. New speed monitors at crossings. Safe routes to school, in the City of Stow, Summit County, Ohio. 89270~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for State STP funds 124461~|~1~|~1~|~01/CMQ~|~Traffic signal removal project inside Steubenville's CBD area, utilizing 100% BHJ 4TB7 funding. 88965~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District preservation 4PF7 (90% Federal) / 4PS7 (10% State) for Mus-70-(9.50-10.50) 88965~|~2~|~5~|~05/NHS~|~"05/NHS/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) Plan Split for Mus-40-(9.59-10.37) 88965~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation: 100 % Bond Funds 7BPB Capped at $8,227,143.54; then 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Replacement of: 1) 6002587 MUS IR70 9.61 Intersect: Over Us 40 & Timber Run; Not BR Eligible for Replacement: Length=348 SD/FO(0) SR=89.0 DSR=6; 2) 6002617 MUS IR70 9.61 Intersect: Over Us 40 & Timber Run; Not BR Eligible for Replacement: Length=397 SD/FO(0) SR=89.0 DSR=6 88965~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - Project Impact Advisory Council (PIAC) Funding 5PI7 (90% Federal) / 4PI7 (10% State) - CAP = $2,000,000.00 for CO; District to provide corresponding CE costs - MOT during bridge replacement of MUS IR 70 9.61 L/R. 88965~|~2~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) Plan Split for Mus-40-(9.14-9.59) 91758~|~1~|~1~|~01/NHS~|~Corridor rehabilitation with access control and drainage correction. WAS 7 17.60-20.57. Federal 80% and State 20%. 91758~|~1~|~2~|~02/MPO~|~Asphalt resurfacing of WAS TR 720 0.00-1.15. Work includes guardrail and minor turn radius improvements. 80% Federal MPO and 20% Local match. 103433~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4. 98797~|~1~|~3~|~03/NHS~|~Resurfacing on Main Street from Lincoln Street to Center Street. 80% federal funds from the District Preservation Program budget. The 20% match will be provided by the City of Findlay. 98797~|~1~|~1~|~01/ENH/FIND~|~Work funded through the Transportation Alternatives Program (TAP). Main Street is on the NHS. 98797~|~1~|~4~|~04/NFP/FIND~|~City of Findlay funded non pavement work. No state or federal funds. 100% local funds. Landscaping costs. 98797~|~1~|~2~|~02/NFP/FIND~|~City of Findlay funded pavement work. No state or federal funds. Not on State route. 100% local funds. 113503~|~1~|~1~|~01/SAF~|~Work funded by the Safe Routes to School program and MPO-CMAQ funds. The MPO CMAQ funds will be used first and then the Safe Routes to School funds. Funds needed over the caps to be provided by the City of Delphos. The Safe Routes to School funds will be used at a 100% rate with the use of Toll Revenue Credit. The MPO-CMAQ funds require a 20% local match provided by the City of Delphos. 116980~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MOE 26 17.76-14.80. 93389~|~1~|~1~|~01/IMS~|~Districtwide systematic guardrail end terminal upgrade on CLA IR 70 2.81 to 2.82. 93389~|~1~|~3~|~03/S>2~|~District Wide Systematic guardrail end terminal upgrade on MOT US 40 10.78 to 13.33, MOT SR 4 17.31 to 17.72, MOT US 40 10.19 to 10.78, MOT US 40 16.08 to 16.10, MOT SR 725 12.78 to 18.68, MOT SR 741 5.47 to 6.63, MOT SR 48 13.16 to 21.98, MOT SR 48 1.27 to 13.06, and MOT SR 725 19.75 tp 22.02. 93389~|~1~|~2~|~02/NHS~|~District wide systematic guardrail end terminal upgrade on MOT US 35 14.53 to 19.87, MOT SR 4 from 17.72 to 21.76, CLA US 68 5.62 to 5.81, LOG US 33 15.68 to 18.24,AUG US 33 13.40 to 15.12, MOT US 40 13.33 to 14.32, LOG US 33 18.24 to 26.05, AUG US 33 13.09 to 13.40, MOT SR 4 21.76 to 22.37, MOT SR 49 8.16 to 8.17, MOT SR 4 22.37 to 24.02, and LOG US 68 9.74 to 9.75. 93389~|~1~|~4~|~04/S<2~|~Districtwide Systematic guardrail end terminal upgrade on CLA US 40 14.06 to 14.08, CLA SR 41 19.86 to 21.00, SHE SR 47 13.92 to 15.25, DAR SR 571 13.01 to 13.02, MIA US 36 11.18 to 11.46, MIA SR 48 15.63 to 17.74 and SHE SR 48 2.59 to 3.20 80450~|~1~|~1~|~01/S>2~|~PROVIDE CENTER LTL ALONG PROJECT AREA, AND DEDICATED TURN LANES AT INTERSECTIONS. RESURFACING THE EXISTING ROADWAY, WITH JOINT REPAIRS AND CULVERT REPAIRS on CLA CR 33 from milepost 0.527 to the Enon SCL Dayton-Springfield Road. 123678~|~1~|~1~|~01/BRO~|~All Work is within this split. 95339~|~1~|~1~|~01/NFA~|~Toledo harbor lighthouse. 101243~|~1~|~1~|~01/STR~|~Resurfacing SR 120 slm 9.48-14.12 (STP Rural eligible). 101243~|~1~|~2~|~02/STR~|~Various bridges. 94502~|~1~|~1~|~01/NFP~|~District wide long line pavement marking plan for FY 17 95064~|~1~|~1~|~01/SAF~|~Safety funding for WB RTL on SR-750 at US-23 95064~|~2~|~2~|~02/SAF~|~Safety funding for a second SB LTL on US-23 at SR-750 98303~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair in Franklin County 98303~|~1~|~2~|~02/SAF~|~Add sign truss in the IR270/SR161 interchange as part of a safety improvement 108814~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 39 over Crab Run by improving the wearing surface and protecting the bridge foundations from scour. In stream work is required. 101195~|~1~|~1~|~01/NFA~|~This plan split is for the Non Federal routes. 101195~|~1~|~2~|~02/STR~|~Smooth seal on rural routes: MIA SR 718 SLM 0.00 to 3.26 & MIA SR 721 SLM 3.21 to 5.51. 80117~|~1~|~1~|~01/NHS~|~Rehabilitate the existing 1540-ft long culvert (COL-7-0595, SFN 1500090) by repairing the newer concrete sections and the older stone sections. 92958~|~1~|~4~|~04/NHS/NEWA~|~"02/NHS/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Newark on 1) Lic-SR 13-08.37 to 09.87; NOTE: This is a Principle Arterial Segment 92958~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with repairs on Lic-SR 13-00.54 to 06.48 92958~|~2~|~7~|~07/S<2/HEAT~|~"07/S<2/PV/HEAT" ? LCATS/City of Heath Paving 4TA7/LC05(80% Federal) / 4BG7(20% Local) ? CAP = $323,000 LCATS Funds - Resurfacing with related repairs on Lic-CR 311-00.00 to 01.48 Hopewell Drive; 92958~|~1~|~6~|~06/STR~|~"06/STR/PV/ " ? Facilities Paving LBM7(100% State) ? No CAP - Resurfacing with related repairs on District 5 Heagquarters Parking Lot and driveways; 92958~|~1~|~3~|~03/NHS/HEAT~|~"03/NHS/PV/HEAT" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing with related repairs on Lic-SR 13-07.76 to 08.37; 92958~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation Paving 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with repairs on: 1) Lic-SR 13-00.00 to 00.54; 2) Lic-SR 13-06.48 to 07.76; 92958~|~1~|~5~|~05/NHS/NEWA~|~"05/NHS/OT/NEWA" - 4BG7(100% Local) - No CAP - Costs for ADA Ramps and any other items or work requested by the City of Newark. 92958~|~3~|~8~|~08/STR/DAWE~|~"08/STR/PV/DAWE" - Dawes Arboretum Turn Lanes - 4BG7 (100% Local) - No CAP - Widening of SR 13 to facilitate turn lanes into Dawes Arboretum. Lic-SR 13-03.85 to 04.21 NOTE: CE to be billed under Plan Split 2 for the resurfacing after the road is widened. 112743~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing of Terex Rd from Londonairy Blvd to Barlow Rd (West) in the City of Hudson. 117065~|~1~|~1~|~01/MPO/NORT~|~Resurfacing. 124954~|~1~|~1~|~01/MPO~|~OKI RPP eligible expenses 76823~|~1~|~2~|~02/S<2/FIND~|~02/S<2/PV/FIND Work inside the City of Findlay. Work on SR568 is covered by this event. The City of Findlay is responsible for paying the 20% nonfederal match. 76823~|~1~|~3~|~03/NFP/FIND~|~Work funded 100% by the City of Findlay for auxilary pavement markings and curb ramps. 76823~|~1~|~1~|~01/NFA~|~01/NFA/PV/ Work on SR 330. This state route has a Functional Classification of Rural Minor Collector and is therefore, not eligible for federal funding for resurfacing. All the work on SR 330 in this project in covered with this split. 86517~|~1~|~2~|~02/ENH~|~Enhancement items on sfn# 7632894, Greenbower Street over the Mahoning River, Lexington Township, Stark County, Ohio. 86517~|~1~|~1~|~01/BRF~|~Replacement of sfn# 7632894 (Greenbower Street) over the Mahoning River, Lexington Township, Stark County, Ohio. 98019~|~1~|~1~|~01/STR~|~Resurfacing and related bridge maintenance work. 119810~|~1~|~1~|~01/BRF~|~ATH-Glouster Madison St. Bridge Replacement 114488~|~1~|~1~|~01/STR~|~Split for rural resurfacing work 85313~|~1~|~1~|~01/MPO~|~Paving and realignment 90898~|~1~|~1~|~01/SAE~|~Install missing sidewalk connection on Wooster Pike near Park Ave. Upgrade existing asphalt sidewalk on Murray Ave. Reconstruct median at Wooster Pike and West Street. Restripe Wooster Pike within the Village Corp. limits to standard 12' lanes for traffic calming. 86127~|~1~|~1~|~01/S<2~|~Reconstruction of SR 585 in the City of Wooster 86127~|~2~|~4~|~04/S<2~|~Part 2 Urban Paving 100% City of Wooster Items WAY-585-00.31 - 00.65 86127~|~2~|~3~|~03/S<2~|~Part 2 Urban Paving - 80/20 - District Allocation/City of Wooster WAY-585-00.31 - 00.65 86127~|~1~|~2~|~02/ENH~|~Sidewalks & Bike Trail 124567~|~1~|~1~|~01/NHS~|~Work for replacing retaining wall 104692~|~1~|~1~|~01/IMS~|~Bridge deck replacement. WAS 821 3.13 (SFN 8405255). Interstate route funded 90 federal/10 state. 98910~|~1~|~1~|~01/S>2~|~Douglas Rd 75523~|~1~|~1~|~01/NHS~|~This split is for resurfacing work on the NHS. All the resurfacing on SR 15 in this project is in this split. 118698~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 33 0.00-4.21 118698~|~1~|~2~|~02/STR~|~Resurfacing HOC-180-11.92-16.01 22198~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work on I-90 using federal IM funds. 22198~|~1~|~2~|~02/SAF~|~Microsurfacing ramps at 3 locations along I-77 using safety funds plus 4 additional locations with district allocation 112005~|~1~|~1~|~01/S5K~|~Guardrail upgrade/replacement project for FY2026. Various routes and sections in D10. Funded 80% Federal/20% State. 112005~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement project for FY2026. Various routes and sections in D10. Funded 80% Federal/20% State. 112005~|~1~|~3~|~03/NFA~|~Guardrail upgrade/replacement project. HOC 374 21.05-24.76. 97974~|~1~|~1~|~01/NFA~|~Oxford Road (CR-60) Landslide repair 100679~|~1~|~2~|~02/S<2~|~Spot paving MAR-4-13.81 to 17.21 100679~|~1~|~1~|~01/NHS~|~Spot paving on the NHS system. MAR-4-13.55 to 13.81 100679~|~1~|~3~|~03/STR~|~Spot paving MAR-4-17.21 to 20.49 110561~|~1~|~1~|~01/STR~|~JAC-327-13.58 SFN 4003616 Bridge Replacement. 110561~|~1~|~2~|~02/NHS~|~added plan split to capture NHS bridge. 90423~|~1~|~1~|~01/NHS~|~Culvert Replacement 109374~|~1~|~1~|~01/SAF~|~Replace the existing span wire traffic signal supports with mast arms at Spring Valley Road in Centerville. 109374~|~1~|~2~|~02/SAF~|~Alternate bid signal related items not eligible for federal participation. 101951~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span. 101951~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 101951~|~1~|~1~|~01/STR~|~Resurfacing. 101951~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 107840~|~1~|~1~|~01/IMS~|~Hydro-demolition and deck overlay FRA IR 70 17.73 over Short St 84207~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY 2014. Various routes and sections throughout D10. Funded 100% State. 120436~|~1~|~1~|~01/NFP~|~Plan Split - 01/NFP/PV/ 100% State (4PS7) 116690~|~1~|~1~|~01/NHS~|~NHS Plan split for resurfacing and resurfacing related items for MAR-23. 121657~|~1~|~1~|~01/IMS~|~Bridge Rehab 106392~|~1~|~1~|~01/BRF~|~Rehabilitation of SFN 2460068 carrying Temple Street Bridge over Paint Creek Work includes new superstructure. deck, and approach slabs. Funded through the Municipal Bridge Program. 108019~|~1~|~1~|~01/NFP~|~Signal and Lighting Reactive Maintenance 108019~|~1~|~2~|~02/SAF~|~install backplates. 116005~|~1~|~1~|~01/SAF/MCEO~|~"01/SAF/OT/MCEO" - 90% Federal (4HJ7) and 10% State (4BC7) - roadside ditch improvements and signing/marking improvements. 108819~|~1~|~1~|~01/NFP~|~Replacing two culverts, relining one culvert. 102476~|~1~|~1~|~01/S<2~|~1"FGP asphalt overlay on BEL-250 100253~|~1~|~1~|~01/MPO~|~Rehabilate Center Street using MPO STP funds. 98568~|~1~|~2~|~02/STR~|~Plan Split for the resurfacing and related pavement work on CLI-73 on the Rural portion. Limits between SLM 2.49 - 6.24 98568~|~1~|~1~|~01/NHS~|~Plan Split for the resurfacing and related pavement work on WAR-73 SLM 20.05 to 20.73. 98568~|~1~|~3~|~03/NHS~|~Plan split for the resurfacing and related pavement work on CLI-73 on the NHS portion. SLM 0.00 to 2.49. 98568~|~1~|~4~|~04/STR~|~Bridge Maintenance on rural route bridges. 98568~|~1~|~5~|~05/NFP~|~Caesar Creek State Park Resurfacing 104013~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder. 116620~|~1~|~1~|~01/MPO/NORT~|~Resurfacing. 96697~|~1~|~1~|~01/NFP~|~Removal of underground storage tank and replace with 2000 gal. above ground storage tank. Project location is at Unity Outpost in Columbiana County. 108950~|~1~|~1~|~01/ERD~|~Repair and resurface work on Smith Road eligible for federal-aid 108950~|~1~|~2~|~02/NFP~|~Work that is 100% local participation 105530~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-4-0.00-1.98 105530~|~1~|~2~|~02/NHS~|~Priority System NHS Split: DEL-23-9.14-9.34, 9.78-9.90 & 10.81-13.08 FRA-161-22.68-23.71 FRA-317-15.97-15.98 FRA-23-1.95-2.20 105530~|~1~|~3~|~03/S<2~|~Urbanized Area (Columbus) Plan Split: DEL-42-5.20-5.35 105530~|~1~|~4~|~04/IMS~|~Interstate Plan Split: FRA-270-43.18-52.16 121281~|~1~|~1~|~01/NFA~|~All Work is within this split 107244~|~1~|~1~|~01/NHS~|~Slide repair on BRO 52 16.22. 108442~|~1~|~1~|~01/NFA~|~OH18-01 ER Event. Landslide repair project. MOE 255 17.06. MOE_NF_0011. Non on any federal aid system funded 100% state ER. 108442~|~1~|~2~|~02/NFA~|~OH18-01 ER Event. Landslide repair project. MOE 255 17.32. Funded 100% state ER. 116599~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of GRE-35 102541~|~1~|~1~|~01/MPO~|~Intersection Improvement. 101274~|~1~|~1~|~01/NHS~|~Resurfacing US 6. 101274~|~1~|~2~|~02/SAF~|~Center line Rumble Stripes Plan split - Hen-US 6- 0.0 - 3.74 101274~|~1~|~3~|~03/NFA~|~Motorist damage in construction zone. 108033~|~1~|~1~|~01/NFP~|~Pavement Marking 89403~|~1~|~1~|~01/STR~|~On SR220, 0.37 mile west of Pleasent Hill Road (SLM 6.10 to 6.23), it is porposed to provide support for the shoulder and roadway along the north side of the pavement. 80/20 split 01/STR/OT/State 90932~|~1~|~1~|~01/SAE~|~Sidewalk additions 92120~|~1~|~1~|~01/STR~|~FHWA Disaster OH11-02 flood: DSR HOL-002:Embankment slip causing pavement to settle. Fix slide by lowering the profile of the roadway. 110368~|~1~|~1~|~01/IMS~|~Replace deck and superstructure on Claycraft Rd structure over IR 270 110368~|~1~|~2~|~02/IMS~|~Cost to repair damage from vehicle accidents 104193~|~1~|~1~|~01/STR~|~Geological Site Management Project - 4SF7 (80% Federal) 4SS7 (20% State) - No CAP - slip repair on SR 285 between SLM 5.35 to 6.06. 105160~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 121739~|~1~|~1~|~01/STR~|~culvert replacement 121739~|~1~|~2~|~02/STR~|~culvert replacement 98994~|~1~|~1~|~01/NHS~|~FUL-20 @ 25.10 Culvert 113547~|~1~|~1~|~01/IMS~|~Plan split for bridge painting on the interstate 88852~|~1~|~1~|~01/STR~|~Bridge Replacement: ERI-113-13.51 (SFN 2202972) 88852~|~1~|~2~|~02/S<2~|~Culvert Replacement: HUR-061-21.08 107574~|~1~|~1~|~01/IMS~|~Mowing contract for SFY 2020 107574~|~1~|~2~|~02/IMS~|~Mowing contract in D7 on:MOT IR 675 SLM 0.00 to 7.44MOT IR 75 SLM 0.00 to 9.31 101440~|~1~|~1~|~01/IMS~|~This plan split includes FAY IR 71 9.45-14.66 and MAD IR 71 0.00-4.56 101440~|~1~|~2~|~02/STR~|~This plan split includes PIC SR 752 from 2.34-8.43. 106671~|~1~|~1~|~01/ENH~|~Restoration of brick pavers, curb and sidewalk, drainage, lighting, etc. 106671~|~1~|~2~|~02/ENH/EL~|~Waterline work with 100% OPWC/Local funds. 110445~|~1~|~1~|~01/SAF~|~Traffic signal installation at the intersection of US 36 and SR 257 89242~|~1~|~1~|~01/SAF~|~A CEAO HSIP funded project to build a roundabout at LUC CR24 7.25-7.26/LUC CR71 1.25-1.26 120438~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 97738~|~1~|~1~|~01/NFP~|~Added plan split due to funding 96293~|~1~|~1~|~01/NHS~|~ROS US 23 12.02 93607~|~1~|~2~|~02/MPO~|~Work items eligible for CMAQ federal funding for the intersection improvement.o CMAQ funds --- 80% fed / 20% local participation 93607~|~1~|~1~|~01/SAF~|~Work items eligible for federal for the intersection improvemet using Safety funds. Any non-fed eligible work and work beyond the cap will be 100% local.o Safety funds --- 90% fed / 10% local participation 93607~|~1~|~3~|~03/NFP~|~Work items not eligible for federal-aid and cost beyond available federal fund sources 102271~|~1~|~2~|~02/NHS~|~ROS 35 (19.70-19.72) 102271~|~1~|~3~|~03/S<2~|~SCI 140 (0.70-1.10)SCI 140 (3.20-3.50)SCI 140 (4.80-5.10) 102271~|~1~|~1~|~01/STR~|~BRO 41 (3.42-4.48) 80/20 PreservationSCI 140 (8.60-9.20) 90/10 Safety 86129~|~1~|~2~|~02/STR/FCEO~|~"02/STR/OT/FCEO" County Engineer's Association Highway Safety Improvement Funding 4HB7(100% Federal) - CAP = $300,000.00 Federal dollars total for Plan Split 1 & 2 - Installation of Guardrail 86129~|~1~|~1~|~01/NFP/FCEO~|~"01/NFA/OT/FCEO" Fairfield County Guardrail Project on non federal aid routes. CEAO funding at 100% w/ maximum of $300,000 119417~|~1~|~1~|~01/BRF~|~Bridge rehab project. 123710~|~1~|~1~|~01/MPO/STCE~|~Resurfacing. 88353~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 4301625; LAK-002-1597 98891~|~1~|~1~|~01/NFP~|~A TID funded project for the resurfacing of ATH CR 7. Agreement number 18593. 92551~|~1~|~2~|~02/NFP~|~D5 HVAC Permits 92551~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities 4MA7-005 - No CAP - Installation of new central A/C system for District Headquarters. 104976~|~1~|~1~|~01/IMS~|~Plan Split for bridges FRA-270-0.96 and FRA-270-1.52 100891~|~1~|~1~|~01/STR~|~SCI 139 11.38 (SFN 7303815) 100891~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 93266~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Rehabilitation on 4505069 LIC SR79 22.76 Intersect: Trib Rocky Fork Creek; Not BR Eligible for Rehabilitation: Length=13 SD/FO(0) SR=87.9 DSR=" " 88678~|~1~|~1~|~01/NHS~|~Resurfacing a portion of SR 129 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 88678~|~1~|~2~|~02/NHS~|~Bridge work on NHS route bridges 94211~|~1~|~1~|~01/NHS~|~Repair bridge carrying SR 7 over Pinch run Belmont County. 112227~|~1~|~1~|~01/NFA~|~D09 District Pavement Long Line Markings (B) 119207~|~1~|~1~|~01/NHS~|~All items of work associated with resurfacing of US35. 119207~|~1~|~2~|~02/S5K~|~All items of work associated with the resurfacing of SR 753. 119207~|~1~|~3~|~03/S>2~|~All resurfacing costs associated with US 62 119207~|~1~|~4~|~04/STR~|~Resurfacing cost associated with SR62, SR 665 & SR 207 99473~|~1~|~1~|~01/BRO~|~CEAO funded bridge replacement, 80/20 118541~|~1~|~1~|~01/NFA~|~NOB CR 56 South Access 118541~|~1~|~2~|~02/STR~|~Concrete Pavement Repair on NOB SR 78 7.08-7.18. Funded 100% State. 91854~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1601563 COS SR79 8.34 Intersect: Mohawk Crk #; BR Eligible for Rehabilitation: Length=43 SD/FO(1) SR=39.3 DSR=5 91854~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1601598 COS SR79 9.55 Intersect: Tributary of Mohawk Crk #; Not BR Eligible for Rehabilitation: Length=49 SD/FO(0) SR=60.1 DSR=5 101085~|~1~|~1~|~01/BRF~|~Federal funds from the Municipal Bridge Program with the non-federal match provided by the City of Van Wert. Use of Toll Credit approved to raise the federal percentage from 80% up to 95% 114013~|~1~|~1~|~01/SAF~|~ROS CR VAR GR FY26. 114909~|~1~|~1~|~01/NHS~|~Construct noise walls. 123522~|~1~|~1~|~01/NFA~|~Slide repair. 92578~|~1~|~1~|~01/STR~|~0.1 Miles North of Felcity Cedron Road. Repair slide on east side of roadway. Slide was part of the ER funding program and was separated out from CLE-133-0.58 PID 91121 as a separate project. 102574~|~1~|~1~|~01/ERD/MCEO~|~"01/E&D/BR/MCEO" - FHWA Accelerated Innovation Deployment (AID) Demonstration Grant OH-FY15 4D57 (Federal 80%) / LNTP (Local 20%) 118906~|~1~|~1~|~01/STR~|~Resurfacing SR 516 103823~|~1~|~1~|~01/NHS~|~Bridge repair on NHS route. 103823~|~1~|~2~|~02/STR~|~Bridge repair on rural route. 91937~|~1~|~1~|~01/STR~|~BRO US50 8.03 Culvert replacement On US50, project is 0.34 mile west of the Highland County line. It is proposed to replace the culvert at SLM 8.03. 80/20 split01/STR/OT/State 114218~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span. 106545~|~1~|~1~|~01/S>2/LOUI~|~Resurfacing, urban paving in the City of Louisville. 106545~|~1~|~2~|~02/S>2/LOUI~|~100% Louisville items such as full and partial depth repairs and ADA curb ramps. 98141~|~1~|~1~|~01/NHS~|~Bridge repair and rehabilitation on three structures. US 23 mainline over US 36, NB off ramp over Delaware Run, and SB on ramp over Delaware Run 98141~|~1~|~2~|~02/NHS~|~Rehabilitation of wall adjacent to NB off ramp rehabilitation and resurfacing of the ramp from the gore to the bridge deck. 98141~|~1~|~3~|~03/NHS~|~Enhancements to the wall face funded by the City of Delaware (100%) 98141~|~1~|~4~|~04/S>2~|~DEL-42 ? pave invert of steel culvert over Sugar Run, repair stone wall, upgrade guardrail. 98141~|~1~|~7~|~07/NHS~|~Costs to repair damage caused by vehicle accidents 98141~|~1~|~5~|~05/STR~|~Purchase pipe to be used on the emergency project 98141~|~1~|~6~|~06/S>2~|~Emergency repairs due to spring flooding 97299~|~1~|~1~|~01/NFP~|~Plan split for mowing along the interstate routes with 4CP7 funds. 94565~|~1~|~1~|~01/NFP~|~Herbicidal spraying of various routes in Trumbull County, Ohio. 93884~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 6.23, SFN 3701174. Rural other federal aid funded 80 federal/20 state. 99640~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state 91858~|~1~|~1~|~01/NHS~|~Resurfacing a portion (SLM 2.69 - 6.74 ithrough the Village of New Richmond) of US 52 in Clermont County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 124672~|~1~|~1~|~01/STR~|~Resurfacing project on MOE CR 81 1.07-2.33. 118608~|~1~|~1~|~01/NFA~|~Split 1 118701~|~1~|~1~|~01/STR~|~GAL 160-1433 750 ft rockfall hazard remediation. 450 ft landslide repair with drilled shaft wall beginning at the 14.38. 105218~|~1~|~1~|~01/STR~|~For all costs associated with associated with the rehabs of CLI-73-1522 and CLI-230-0827 107961~|~1~|~1~|~01/MPO~|~Resurfacing of Sanitarium Rd in the Village of Lakemore. 83705~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using a double-microsurfacing treatment. GAL US 35 0.00-3.79. NHS route funded 80 federal/20 state. 117522~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 2001 0.13, SFN 5630290. 96723~|~1~|~1~|~01/NFA~|~Trumbull County Warren Outpost, convert current barn into Coverall Cold Storage by keeping existing walls and removing roof. Demo old building and build 500 ton material storage bulding 99837~|~1~|~1~|~01/CMQ~|~Reconstruction of Montgomery Road (US-22/SR-3) between the Norwood corp. line and Silverton corp. line. Existing sub-standard typical section will be revised to provide 5 lanes (two through lanes in each direction with peak hour restricted parking and a center turn lane), per an ODOT 2009 safety study recommendation. Traffic signals in the corridor will be upgraded to 12" LED signal heads with countown pedestrian signals. 86327~|~1~|~1~|~01/ENH~|~Rebuilding and widening existing sidewalks, new sidewalks wehre missing, installation of decorative pedestrian lighting and landscaping on East Stroop from the East side of Shroyer Road intersection to the West side of the Royal Oak Drive intersection. MOT CR 609 from SFL 0.510 to 0.710. 100742~|~1~|~1~|~01/SAF~|~Construction of a Northbound left turn lane on State Route 44 at Enterprise Parkway, including adjusting driveways at gas station. In the City of Ravenna, Portage County, Ohio. 100742~|~1~|~2~|~02/SAF~|~Reconstruction of signal at State Route 14 and State Route 44 intersection. 91411~|~1~|~1~|~01/STR~|~Brdg replacement. East of Adams County Line on SR125. 7303289 SCI SR125 0.73 Intersect: Rocky Fork80 Fed/20 State. 01/STR/BR/State 96359~|~1~|~1~|~01/SAF~|~Improvement of Waterloo Road / Arlington Road intersection. Includes the removal of right-turn slip ramps, and extension of medians. In the City of Akron, Summit County, Ohio. 114524~|~1~|~2~|~02/STR~|~Asphalt on LAW 775. 114524~|~1~|~3~|~03/NFA~|~Asphalt on LAW 217. 114524~|~1~|~4~|~04/NHS~|~Paving on approach slabs to correct smoothness from LAW-7 (6.87-6.90) and from (6.94-6.97) 114524~|~1~|~5~|~05/STR~|~Bridge PM. 114524~|~1~|~1~|~01/S>2~|~Asphalt on LAW 775. 113334~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (100% State - No CAP - Project to repair and replace damaged Guardrail District Wide 88739~|~1~|~2~|~02/SAF/ASD~|~100% City of Ashland Water Work 88739~|~1~|~1~|~01/SAF~|~Reconstruction of 0.8 miles of US 42 and replacement of existing grade separated intersection with SR 96/US 250 with an at-grade signalized intersection. Widening and resurfacing of SR 96/US 250 to accomodate the intersection improvements. Bridge widening and culvert work to accomodate the intersection improvements. 114551~|~1~|~1~|~01/NFP~|~All culverts are under one split. 108070~|~1~|~1~|~01/STR~|~General plan split. Will add more specific splits once locations have been determined. 109365~|~1~|~1~|~01/NFA~|~ODNR Sponsored culvert replacement 102708~|~1~|~1~|~01/IMS~|~Bridge Deck Replacements: LOR-IR-90 11.530 (L) SFN 4704398 OVER LOR-54-0514 TH-54 Major Rehabilitation ? Deck replacement (004) LOR-IR-90 11.530(R) SFN 4704371 OVER LOR-54-0514 TH-54 Major Rehabilitation ? Deck replacement (004) 91849~|~1~|~1~|~01/STR~|~General System preventative maintenance paving on various routes 96385~|~1~|~1~|~01/SAF~|~Sidwalk improvements on Ludlow from Maple to Broadway (US36), Chestnut from Ludlow to Debra including curb extensions and enhanced crossings in front of the Elementary School and north side of Broadway from Stevens to Owens with RRFBs at crossing at Stevens St. 102826~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7 (100% State) - No CAP - For district wide mowing contract 76437~|~1~|~3~|~03/S>2~|~Replacement of waterline/sanitary belonging to the City of Barberton. City owned utilities outside the city limits. Coventry Township, Ohio. 76437~|~1~|~2~|~02/S>2~|~Replacement of waterline/sanitary belonging to the City of Akron. City owned utilities outside the city limits. 76437~|~1~|~1~|~01/S>2~|~Widen State Rpite 93 to five lanes at the intersction of Robinson Avenue, improve intersection with addition of dual eastbound left turn lanes and additional travel lanes. Widen Northbound to Cormany Avenue. 100982~|~1~|~1~|~01/NHS~|~DSR# JEF-002 86457~|~1~|~1~|~01/NHS~|~Work associated to the following locations: BUT-4-2461, BUT-4-2475, BUT-4-2570 and HAM-127-1213 86457~|~1~|~2~|~02/STR~|~For costs associated with the following locations: CLI-380-0110 WAR-132-1056 GRE-380-0149 PRE-177-0468 BUT-126-0037 BUT-732-0099 CLE-133-0331 GRE-68-0118 86457~|~1~|~4~|~04/IMS~|~For costs associated with HAM-71-0872. 86457~|~1~|~3~|~03/S<2~|~For costs associated with location WAR-123-2563. 93121~|~1~|~1~|~01/STR~|~District Allocation 93121~|~1~|~2~|~02/S<2~|~District Allocation - Urbanized 93121~|~1~|~3~|~03/STR~|~SFN 7005474 RIC-96-16.57SFN 7007213 RIC-603-13.57 93121~|~1~|~4~|~04/STR~|~Hauling Grindings 121085~|~1~|~1~|~01/NFP~|~PM FY2030 plan split. 116952~|~1~|~1~|~01/S>2~|~Resurfacing 108038~|~1~|~1~|~01/STR~|~Bridge Replacement 116687~|~1~|~1~|~01/SAF~|~Primary plan split, Federal eligible items 86081~|~1~|~1~|~01/MPO~|~Road extension 84551~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 550 0.00-10.56. Rural other federal aid funded 80 federal/20 state. 84551~|~1~|~2~|~02/SAF~|~Safety funded sidewalk improvements. Addition of curb and sidewalk between Yeager Road and the convenient store. Bulb outs at State Route 555 intersection and the Yeager Road intersection. 99743~|~1~|~1~|~01/MPO~|~For work on the multi-use path. 116343~|~1~|~1~|~01/S<2~|~Resurfacing SLM 5.58 to SLM 9.501 116343~|~1~|~2~|~02/STR~|~Resurfacing SLM 9.501 to SLM 11.07 95067~|~1~|~1~|~01/IMS~|~Plan split for all work for this project 103129~|~1~|~1~|~01/MPO~|~Installation of bike racks at city facilities using MPO TAP funds @80% federal participation with 20% local matching funds. 106082~|~1~|~2~|~02/S>2~|~100% City of Columbus Items 106082~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-62-12.44-13.50 FRA-62D-1.61-2.20 102575~|~1~|~1~|~01/NFP~|~Outpost Facility in Ottawa Co. 101053~|~1~|~1~|~01/STR~|~Culvert replacement. 112627~|~1~|~1~|~01/MPO~|~Resurfacing of Park Ave from South St to Ivanhoe St in the City of Warren. 98200~|~1~|~2~|~02/NHS~|~Work on structures SR 315 SB over Sullivant Ave (SFN 2514923), US 62 (Rich St) (SFN 2514982), and US 62D (Toen St) (SFN 2515016) and new bridge to replace the SR 315 SB to IR 70 EB ramp bridge. 98200~|~1~|~1~|~01/NHS~|~SR 315 mainline reconstruction and ramps B4 (SR 315 SB to IR 70 WB) and ramp B5 (SR 315 SB to IR 70 EB) and SB on ramp from Town St 103046~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 26 22.06, 100% State funds. 121622~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 7 28.19, CFN 1831158. NHS route funded 80 Federal/20 State. 115624~|~1~|~1~|~01/IMS~|~MOWING 106402~|~1~|~1~|~01/STR~|~Add turn lanes on US62/SR3 116085~|~1~|~3~|~03/NFA~|~Chip Seal 116085~|~1~|~1~|~01/S5K~|~Chip Seal 116085~|~1~|~2~|~02/STR~|~Chip Seal 107215~|~1~|~1~|~01/ENH~|~Install new sidewalks along Genesee Ave in Howland Township. 100713~|~1~|~2~|~02/IMS~|~Widening for additional lane. 100713~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement. 100713~|~1~|~3~|~03/IMS~|~New superstructure, widening and pier replacement/relocation. 122194~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-D 122194~|~1~|~2~|~02/NFA~|~NEVI Round 2B I-75-D 120194~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in construction phase 105593~|~1~|~1~|~01/NFP~|~ASD US 0250 10.86 & HUR US 0224 07.75. 100265~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.0M. 98809~|~1~|~1~|~01/MPO~|~80/20 federal with local mathing funds for elgible work items. 111372~|~1~|~1~|~01/STR/PCEO~|~CEAO Funded resurfacing project on portions of Major Collector Routes CR 98 (Ceramic Road) and CR 56 (Jamestown Road) in Perry County - CSTP Funds 4B77 (80% Federal) / 4BG7 (20% Local) - see Cap comments. 111372~|~1~|~2~|~02/NFA/PCEO~|~CEAO Funded resurfacing project on portions of Minor Collector Route CR 30 (Zion Road) in Perry County - CSTP Funds 4B77 (80% Federal) / 4BG7 (20% Local) - see Cap comments. *Funding for this Rural Minor Collector is contingent upon Congress including the minor collector provision in the next transportation funding bill. 95417~|~1~|~1~|~01/SAF/ROS~|~It is proposed, using CEAO Safety funds, to install new and upgrade existing guardrail on various Ross County routes. 100% Safety CEAO funds 105640~|~1~|~1~|~01/NHS~|~plan split 95473~|~1~|~1~|~01/STR~|~Widen ATH 13 11.86 and add left turn lane to ATH 78. 95473~|~1~|~2~|~02/SAF~|~Widen ATH 13 and add left turn lane onto ATH 78. Other federal aid funded 90 federal safety/10 state safety. 119865~|~1~|~1~|~01/S5K~|~All Work Included in this Split 121361~|~1~|~1~|~01/IMS~|~Plan split for all work associated with WOO-280-0339 & WOO-280-0386 bridges 112412~|~1~|~1~|~01/SAF~|~Friction treatment and curve warning signs at the following locations in the City of Cincinnati: East Mitchell Ave @ Red Bud Ave, West Fork Rd from Montana Ave to Todd Ave, and Central Pkwy @ Brighton Pl 83824~|~1~|~1~|~01/STR~|~Crack Sealing on the General System for FY2013 99860~|~1~|~1~|~01/NHS~|~Raise structure, new deck, conert to semi-integral abutments, paint superstructure and seal concrete surfaces. 99860~|~1~|~2~|~02/NHS~|~Structural steel repairs due to impact damage over Southbound SR 4 108096~|~1~|~1~|~01/STR~|~Bridge maintenance on rural route bridges. 108096~|~1~|~2~|~02/IMS~|~Bridge maintenance on interstate route bridge. 108096~|~1~|~3~|~03/S<2~|~Bridge maintenance on small urban bridge. 106655~|~1~|~1~|~01/ENH~|~Construct a bikeway to connect the Hockhocking Adena Bikeway with the northwest side of Athens. 107775~|~1~|~1~|~01/STR~|~Landslide repair project using ER FHWA funds at 100% Federal. ATH 550 17.76-17.81. 122210~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-76-A 117385~|~1~|~1~|~01/ENH~|~Bicycle and Pedestrian Improvements (including ADA compliance) at Belmont County Courthouse utilizing TAP (4B37) Federal funds at 95%. 117344~|~1~|~1~|~01/BRF~|~Primary Plan Split for Local Bridge Program eligible scope items. 114866~|~1~|~1~|~01/NFP~|~Chip seal fund split 23821~|~1~|~1~|~01/IMS~|~Planing and resurfacing of existing pavement wideing u-turns and minor bridge work on Interstate 75 from the Auglaize/Shelby County Line to the junction of US 33; and from the junction of State Route 274 to the junction of the Auglaize Shelby County Line. SHE-IR-75 17.540 to 20.55 AUG-IR-75 0.000 to 4.970 98041~|~1~|~1~|~01/NFP~|~Added plan split due to funding 121316~|~1~|~1~|~01/NFP~|~Created for TID involvement 99589~|~1~|~1~|~01/MPO~|~Resurfacing Elm Road from South Street to SR 5/82 with rubberized asphalt on an asphaltic leveling course. Includes incidental drainage work, ADA ramps; curb, linear grading behind curb and sidewalk replacement as necessary. Also includes new pavement markings and signs. 119169~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment on HOC 33 4.20-9.47. 117744~|~1~|~1~|~01/BRF~|~Plan split for CEAO LBR Program eligible bridge replacement work. 108922~|~1~|~1~|~01/NFA~|~TAP grant project to restore a covered bridge in Village of Lynchburg. 112927~|~1~|~1~|~01/IMS~|~DEL-71 from 0.84 to 1.61 112927~|~1~|~2~|~02/S>2~|~DEL-42 from 11.16 to 12.34 and DEL-750 from 5.5 to 7.06 99478~|~1~|~1~|~01/NHS/NEWA~|~"01/NHS/PV/NEWA" - LCATS CAMQ Funds - 4TB7 (80%)/4BG7 (20%) -CAP = $400,000 - turn lane addition on the eastbound off-ramp (Ramp C) at the SR 16/Church Street interchange. 98284~|~1~|~2~|~02/NHS~|~Install Intelligent Transportation System (ITS) Dynamic Message signs on US 33 and US 50 around the City of Athens (4 locations). NHS route funded 100% state. 98284~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2018. ATH 33 5.16-11.44, 14.87-19.05, ATH 50 1.74-12.17, 14.81-17.71, 33.15-39.04, ATH 7 2.05-2.86 and ATH 32 0.00-1.42. NHS route funded 80 federal/20 state. 121452~|~1~|~1~|~01/STR~|~All work associated with the Rehabilitation of the PRE-40-1116 bridge. 119096~|~1~|~1~|~01/STR~|~Resurfacing. 115329~|~1~|~1~|~01/IMS~|~SFN 7502109 - Reface rear abutment, patch edge spalls, abutment corners and wingwalls, encase pier columns SFN 7502133 - Extend forward right scupper, patch edge and railing spalls, abutments, and wingwalls, encase pier columns 115329~|~1~|~3~|~03/STR~|~SFN 1201352 - Patch abutment and fix undermining issue 115329~|~1~|~2~|~02/STR~|~SFN 1201387 - Patch abutments and wingwalls SFN 4602269 - Patch deck potholes along joint and reseal, patch corners of deck and abutments, seal with SRS, and encase piers SFN 5503973 - Encase pier columns all the way up to the cap 117125~|~1~|~2~|~02/S>2~|~This plan split includes all work associated with constructing the shared use path on this project. 117125~|~1~|~1~|~01/S>2~|~This plan split includes all work associated with widening Indian Ripple. 122100~|~1~|~1~|~01/NFA/MUSK~|~Muskingum County CEAO Federal/State Exchange Programs Funding - 4C87 (95%) / LNTP (5% Local Match) - Replacement of MUS TR 196 01.02 (SFN 6032516). 96312~|~1~|~1~|~01/STR~|~STP Rural. 80/20 Fed/State. Non-BR eligible bridge funds. 97468~|~1~|~1~|~01/NFP~|~Added plan split due to funding 118874~|~1~|~1~|~01/STR~|~Resurfacing SR 147 124961~|~1~|~1~|~01/MPO~|~Resurfacing of Hamilton Trenton Road between State Street (SR73) and Edgewood Drive 93452~|~1~|~1~|~01/S>2~|~Intersection improvement, SUM SR-91 at Norton Road in the City of Hudson. 122492~|~1~|~1~|~01/STR~|~Roadway rehabilitation and associated improvements utilizing State Oil & Shale funds at 100% up to Program maximum. 124500~|~1~|~1~|~01/STR~|~Work on SR 98 to raise profile and replace bridge 119952~|~1~|~1~|~01/SAF~|~Plan Split for Safety funded scope. 119952~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded costs for Alternate bid items. 95403~|~1~|~1~|~01/MPO~|~Bridge replacement at two locations along Rockside Road (CR-53) utilizing MPO STP funds @ 80% Federal and 20% Local match. 95403~|~1~|~2~|~02/NFP~|~Plan split for non-eligible items at 100% local cost. 95318~|~1~|~1~|~01/CMQ~|~Improvements to the existing intersection of SR-73 and SR-741 in Springboro including installation of a dual left turn lane from eastbound SR-73. Auxiliary right turn lanes will be added on east and west approaches of SR-73, a raised concrete median will be constructed along the dual left turn lanes to provide access management at the intersection, necessary upgrades to the existing traffic signal, and various enhancements to the intersection. 94331~|~1~|~1~|~01/STR~|~Plan split for resurfacing on FUL-20A, FUL-109 & FUL-127 94331~|~1~|~2~|~02/NFP~|~Extra Work for Loves Travel Stop 103392~|~1~|~1~|~01/CMQ~|~Construction of a sidewalk along Montgomery Road from Dearwester Drive to the existing walk approximately 375 feet south of Pinehurst Lane. 122857~|~1~|~1~|~01/MPO/WARR~|~Resurfacing. 101286~|~1~|~1~|~01/STR~|~Resurfacing. 112637~|~1~|~1~|~01/STR~|~AC Overlay with Repairs ASD-511-22.98 to 27.639 including bridge maintenance 94156~|~1~|~1~|~01/IMS~|~Extrusheet replacement project in FRA county No lcoations given at time of programming, mostly interstate 104980~|~1~|~1~|~01/NHS~|~Plan Split for bridge FRA-315-11.66 108546~|~1~|~1~|~01/STR~|~ER Event OH18-01. Landslide repair project. MRG CR 3 4.34, DSR MRG-003. Rural other federal aid funded 80 federal/20 local ER. 103265~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers. 90595~|~1~|~1~|~01/SAF~|~RPM replacement project using CEAO funds. 100% Federal. Various routes and sections in Gallia County. 97623~|~1~|~1~|~01/BRF~|~Replace MRW-TR 161-0.25 (Phillips Rd) structure over Alum Creek SFN 5931622 97623~|~1~|~2~|~02/BRF~|~Replace MRW-TR 166-0.28 (Pompey Rd) structure over Turkey Run SFN 5932238 97623~|~1~|~4~|~04/BRF~|~Replace MRW-TR 21-5.88 (Prospect Mt Vernon Rd) structure over Alum Creek SFN 5932440 97623~|~1~|~3~|~03/BRF~|~Replace MRW-TR 191-0.00 (Bennington Harmon Rd) structure over Big Walnut Creek SFN 5930634 111391~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB SR 146 13.17, CFN 1827699. Rural other federal aid funded 80 Federal/20 State. 112261~|~1~|~1~|~01/SAF~|~Pavement markings on various county routes. 112573~|~1~|~1~|~01/SAF~|~Road rechannelization, signal upgrades, median construction, and other miscellaneous work not related to the construction of sidewalks. 112573~|~1~|~2~|~02/MPO~|~All sidewalk, bicycle, and pedestrian related work. 123311~|~1~|~1~|~01/STR~|~Resurfacing of approximately 3.56 miles of CR44 and 2.45 miles of CR16 100816~|~1~|~2~|~02/CMQ~|~Sidewalk on the bridge and approaches. 100816~|~2~|~3~|~03/CMQ~|~Construction of a new section of the Lebanon Country side YMCA trail between the current terminus at Deerfield Road and East Street along Deerfield Road and ultimately tying into the City of Lebanon Bike Park on the east side of Bypass 48, along Turtlecreek Union Road. 100816~|~1~|~1~|~01/S>2~|~Rehab bridge by replacing concrete deck. This split includes a base estimate for VPF as well as VPF alternate bid items. 100816~|~1~|~4~|~04/NFP~|~Retroactive fuel price adjustment 76705~|~1~|~1~|~01/IMS~|~rehab LUC IR280 0-2.07 119199~|~1~|~1~|~01/NHS~|~Traffic Signal replacement at LOR-2 and Baumhart Rd ramps. 119199~|~1~|~2~|~02/STR~|~Traffic signal replacement at LOR-58 and LOR-303 intersection. 115180~|~1~|~1~|~01/S>2~|~Culvert invert paving at DEL-257-4.89 101947~|~1~|~1~|~01/S<2~|~Replacement of structure 10' to 20' span. 101947~|~1~|~2~|~02/STR~|~Replacement of structure 10' to 20' span. 101947~|~1~|~3~|~03/S<2~|~Aqua Ohio water line stabilization during bridge construction. 107947~|~1~|~1~|~01/SAF~|~Plan split for traffic signal work 85412~|~1~|~1~|~01/ERD~|~Plan split for all work using earmark funds. 113489~|~1~|~1~|~01/SAE~|~SRTS Funded Plan split 115515~|~1~|~1~|~01/BRF/KCEO~|~Knox County Engineer's CEAO LBR Funds - 4B87 (Federal 80%) / LNTP (15% Credit Bridge) / LNTP (5% Local Match) - Bridge replacement of SFN 4236580 using the CEAO LBR Program 118876~|~1~|~1~|~01/STR~|~STP plan split. 113742~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 21640~|~1~|~1~|~01/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on selected Interstate route 21640~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Structure Repairs with related work on selected Interstate bridges 21640~|~1~|~3~|~03/S<2~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Structure Repair with related work on selected bridges on OFAH-Urban routes 89446~|~1~|~1~|~01/STR~|~Loop Detector Repair 119906~|~1~|~1~|~01/STR~|~Project to address flooding location by improving drainage and realigning vertical roadway profile at MEG 124 9.20-9.43. Funded 80% federal Protect/20% state. 122118~|~1~|~1~|~01/STR~|~Plan split for federally eligible design build costs 122417~|~1~|~1~|~01/IMS~|~Plan split for sign repair at various locations 85017~|~1~|~1~|~01/MPO~|~100% City funded prior to MORPC funds being used per transferring funds agreement 85017~|~1~|~2~|~02/MPO~|~Reconstruction and widening of Alum Creek Drive from Refugee to Frebis, known as Part 1 (3105E)Local Sponsor - Columbus 85017~|~1~|~3~|~03/MPO~|~DOP, known as Part 2 (3277-E) 85017~|~1~|~4~|~04/MPO~|~On-going Engineering Services provided by Prime 121572~|~1~|~1~|~01/MPO/GREE~|~Resurfacing. 79746~|~1~|~1~|~01/NHS~|~Resurfacing 93535~|~1~|~1~|~01/SAE~|~Improve road in front of school with elevated intersections for traffic calming, RRFB signs, curb Bulbs at intersections with Southern Avenue, improved crosswalks, and school zone signing up to code. Bike racks at the school. 101739~|~1~|~1~|~01/STR~|~HIG 62 (6.35-10.38) 121734~|~1~|~1~|~01/NHS~|~Line culvert 115996~|~1~|~1~|~01/BRF~|~Replace superstructure. 86933~|~1~|~3~|~03/S>2~|~Resurfacing SR 619 from 4.66 to 6.69. 86933~|~1~|~2~|~02/STR~|~Resurfacing STA SR 619 from 6.69 to 7.36. 86933~|~1~|~4~|~04/S>2/HART~|~100% Village items in Hartville, including curb ramps. 86933~|~1~|~1~|~01/NHS~|~Plan Split for STA SR 43 19.37 to 25.00 resurfacing. 123957~|~1~|~1~|~01/STR~|~geotech plan split. 90538~|~1~|~1~|~01/SAE~|~Pavement Markings on various county routes in Stark County. 115499~|~1~|~1~|~01/BRF~|~Bridge replacement 88619~|~1~|~1~|~01/STR~|~AUG-SR-66 12.870 to 22.410 Resurface the existing roadway with asphalt concrete from USR 33 (SLM 12.87) to AUG/ALL county line (SLM 22.41). 117459~|~1~|~1~|~01/NFA~|~Created for J&C involvement 100870~|~1~|~2~|~02/S>2~|~STA SR 172 0.90 to 2.41 100870~|~1~|~3~|~03/STR~|~STA SR 172 0.00 to 0.90 100870~|~1~|~4~|~04/NHS/MASS~|~STA US 62 10.86 to 11.04STA SR 172 2.96 to 3.03Urban paving in the City of Massillon. 100870~|~1~|~1~|~01/NHS~|~STA US 62 8.50 to 10.86 and 11.04 to 11.54STA SR 93 19.24 to 20.64STA SR 172 2.41 to 2.96 and 3.03 to 3.95 and 8.83 to 11.91 107787~|~1~|~1~|~01/STR~|~added plan split 111374~|~1~|~1~|~01/MPO~|~MPO funded item split - Stickney Ave 111374~|~1~|~2~|~02/MPO~|~Plan split for King Ave 105690~|~1~|~1~|~01/NFP~|~Plan split for all work. 119888~|~1~|~1~|~01/NFA~|~NEVI Round 2 13-A 97322~|~1~|~1~|~01/MPO~|~Updgrade the signal along Mayfield Rd in Cleveland Hts using MPO CMAQ funds. 97322~|~1~|~2~|~02/NFP~|~100% local participation for work items not eligible for federal funding. 118737~|~1~|~1~|~01/SAF~|~RPM project in Scioto County. 104754~|~1~|~1~|~01/NFP~|~Guardrail replacement on various routes throughout district 4. 101510~|~1~|~1~|~01/NHS~|~Landslide repair 99993~|~1~|~1~|~01/IMS~|~Split for sealing all structures at 90% federal and 10% state. 124020~|~1~|~1~|~01/S>2~|~Asphalt Concrete Overlay with Repairs MED-94-0.00 to 1.149 and WAY-94-21.250 to 21.481 124020~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs WAY-94-19.069 to 21.250Includes bridge maintenance 123680~|~1~|~1~|~01/IMS~|~Plan split for interstate locations 93447~|~1~|~1~|~01/IMS~|~Structural steel bridge painting on: SFN 7502168 SHE 75 1007 over CR 45 Mason Road 93447~|~1~|~2~|~02/STR~|~Structural steel bridge painting on: SFN 1902229 DAR 121 2883 Swamp Creek SFN 5403006 MER SR 219 0233 Wabash River 76693~|~1~|~1~|~01/STR~|~01/STR/PV/ This split uses rural STP funds. The entire project uses this split. 102052~|~1~|~1~|~01/STR~|~Lighting and enhancement inside the Village of Jackson Center. 94252~|~1~|~1~|~01/NHS~|~Brdg 80/20 split 01/NHS/BR/State 122332~|~1~|~1~|~01/NHS~|~Repair bridge abutment stemming from a bridge strike. 108399~|~1~|~1~|~01/NHS/ELVP~|~Landslide repair from OH18-01 ER event. 100879~|~1~|~1~|~01/STR~|~AC Overlay with and without repair 109620~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of school zone flashers within District 5 at OFAH-Rural locations. 109620~|~1~|~2~|~02/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of school zone flashers within District 5 at NHS locations. 104911~|~1~|~1~|~01/NFA~|~Kirkland Schools bus replacement 82973~|~1~|~1~|~01/NHS~|~District Wide Pavement Preventative Maintenance project for the Priority System for FY2016. Routes include GRE-35 and HAM-126 87326~|~1~|~1~|~01/STR~|~Rural BRO 68 39.89 0801925 BRO 68 40.16 0801984 HIG 138 0.540 3602974SCI 728 1.53 7306172 PIK 104 1.85 6600905 87326~|~1~|~5~|~05/STR~|~Culvert SCI SR 348 SLM 15.15 87326~|~1~|~4~|~04/NFA~|~Non Fed Aid HIG 131 1.21 3602168 ROS 102 0.34 7136862 87326~|~1~|~3~|~03/S<2~|~Urban HIG 73 10.57 3601676 87326~|~1~|~2~|~02/NHS~|~NHSHIG 62 13.49 3601226 LAW 52 17.21 4401115 SCI 52 5.23 7300611 103011~|~1~|~1~|~01/IMS~|~Mowing Contract 101636~|~1~|~1~|~01/NFA~|~Construction of a detention pond for Turnpike runoff. 103592~|~1~|~1~|~01/STR~|~Intersection improvement at SR 39 and CR 77 in Holmes County. 124601~|~1~|~1~|~01/S>2~|~CEAO HSIP Safety project to upgrade guardrail on various county roads. 84602~|~1~|~1~|~01/S<2~|~Replace bridge BUT-122D-0148 (0902314), a 5 cell CMP pipe arch structure (87"x63") that carries SR 122 over the hydraulic canal in Middletown. 98853~|~1~|~1~|~01/NFP~|~Rehabilitation of Boggs Lane and Jake Sweeney Way within Springdale's Tri-County Parkway Business District including total pavement replacement on Sweeney Way, mill and resurfacing of Boggs Lane with necessary pavement repairs, total curb and gutter replacement, drive apron replacement as necessary, and new pavement markings. 82819~|~1~|~1~|~01/NFP~|~Slide repair along SR-531 near Whitman's Creek, Ashtabula County, Ohio. 115550~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in POR, STA and SUM counties. 115820~|~1~|~1~|~01/IMS~|~Remove & replace mainline superstructure. 85029~|~1~|~2~|~02/S<2~|~Project scope is plumbing and electrical upgrades to the Marietta Armory Square Welcome Center (project) on Front Street using Federal Scenic Byway funds. 100% Local portion. 85029~|~1~|~1~|~01/ERD~|~Project scope is plumbing and electrical upgrades to the Marietta Armory Square Welcome Center (project) on Front Street using Federal Scenic Byway funds. SB-2007-OH-5 Program Code L970. 80% Federal and 20% Local. 116421~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project. 99620~|~1~|~1~|~01/NFP~|~Construction of a 3,000 ton salt coverall (60'x100') with brine tank pads on north side of building, 3 bay cold storage building (32'x48), Loader lean-to (16'x20') with electric for a block heater and lights, 840' of fencing, 50' gate and 20' gate. All dimensions approximate. 115619~|~1~|~1~|~01/IMS~|~MOWING 115831~|~1~|~1~|~01/IMS~|~Minor repair on structure FRA-670-3.12 (SFN 2517639) over Neil Ave. 118109~|~1~|~1~|~01/SAF~|~Install a roundabout at US 33 and SR274 116557~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing. 114815~|~1~|~1~|~01/S>2~|~4 inch overlay on Maier Place and other necessary items 95532~|~1~|~1~|~01/STR~|~On US50, begin @ US35 ramp (SLM 28.11) and terminate at Vinton Co. line (SLM 37.68), it is proposed to resurface the highway with asphapt concrete.Pave Thru:SFN 7103328 SLM 28.35 (This is a RR bridge which will be mill & fill under it.)SFN 7103476 SLM 36.3080/20 95532~|~1~|~2~|~02/STR~|~Bridge for rehab.SFN 7103336 SLM 29.67SFN 7103425 SLM 32.76SFN 7103492 SLM 36.92 95532~|~1~|~3~|~03/NHS~|~SFN 7103395 SLM 25.06 100868~|~1~|~1~|~01/NHS~|~This plan split is for NHS route. 106101~|~1~|~1~|~01/IMS~|~FHWA Emergency Relief Finds - 4BY7 (100% Federal) - Slip repair of 300 feet of fore slope along Gue-IR 70-11.33 92589~|~1~|~1~|~01/IMS~|~Resurfacing and related work on IR 70 in Licking and Muskingum Counties 93435~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. 93435~|~1~|~2~|~02/NFP/Akrn~|~In-eligible signal items. 91031~|~1~|~2~|~02/MPO~|~100% Local items. 91031~|~1~|~1~|~01/MPO~|~Minor rehabilitation 110323~|~1~|~1~|~01/NHS~|~Replace structure HAS-250-0370 (SFN 3401561) with new structure. 120128~|~1~|~1~|~01/S>2~|~Work eligible for SRTS Funding 124861~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties. 106732~|~1~|~1~|~01/SAF~|~Signal upgrade work funded through ORDC. 96598~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 554 11.52 and 12.37. Rural other federal aid funed 80 federal/20 state. 88873~|~1~|~2~|~02/S>2~|~FY2015 Urban Paving in Springboro on Sr 73 from I-75 (slm 3.91) to Sr 741 (slm 5.88). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 88873~|~1~|~1~|~01/S>2~|~FY2015 Urban Paving in Springboro on Sr 73 from I-75 (slm 3.91) to Sr 741 (slm 5.88). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 89262~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for State STP funds 89262~|~1~|~2~|~02/NFP~|~Work items that are not eligible for federal-aid. 115188~|~1~|~1~|~01/ENH~|~Project will add bump outs and curb ramps at the intersections of Stewart St. and Conley St. and at Stewart St. and Hopeland Ave. This improvement will also add pedestrian scale lighting and decorative crosswalk markings. 102794~|~1~|~1~|~01/STR~|~Apply smooth seal to various STP Rural routes 102794~|~1~|~2~|~02/S<2~|~Applying smooth seal to various STP < 200k routes 102794~|~1~|~3~|~03/S>2~|~Applying smooth seal to various STP > 200k routes 114258~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges 97550~|~1~|~1~|~01/NFP~|~Costs for installation of signs only 121795~|~1~|~1~|~01/SAF~|~GR on various CR. 109677~|~1~|~2~|~02/S>2~|~Chip seal on the urban section of GRE-380:GRE-380 SLM 6.36 to 6.93 109677~|~1~|~1~|~01/STR~|~Chip seal on the rural locations on portions of CLI-28 + GRE-380 :CLI-28 SLM 5.48 to 10.38GRE-380 SLM 0.00 to 6.36 95484~|~1~|~1~|~01/STR~|~01/STR/OT ; Plan split for 80% federal and 20% state funded culvert work using the culvert SACs 4CW7 and 4CV7. 98037~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Gue-SR 513 98037~|~1~|~2~|~02/NFA~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Resurfacing on Gue-SR 761 98037~|~1~|~3~|~03/IMS~|~District Preservation Bridge Funds - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Concrete Deck patching and deck sealing on selected bridges 98037~|~1~|~4~|~04/STR~|~District Preservation Bridge Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Concrete Deck patching and deck sealing on selected bridges 98037~|~1~|~5~|~05/NFA~|~District Preservation Bridge Funds - 4PS7 (100% State) - No CAP - Concrete Deck patching and deck sealing on selected bridges 122090~|~1~|~1~|~01/BRF~|~Bridge replacement 119877~|~1~|~1~|~01/STR~|~Landslide repair. 116594~|~1~|~1~|~01/IMS~|~Plan Split for resurfacing on CLE IR 275 90702~|~1~|~1~|~01/MPO~|~MPO funded project to resurface waterville-Monclova Rd in the City of Waterville. LUC CR124 0.00 -0.75 109559~|~1~|~1~|~01/BRF~|~Bridge Replacement Plan Split 104150~|~1~|~1~|~01/NFP~|~Guardrail 101342~|~1~|~1~|~01/STR~|~bridge rehab. 119043~|~1~|~2~|~02/NHS~|~All bridge overlay work for bridges classified as being on the NHS. 119043~|~1~|~1~|~01/STR~|~All work on STP Rural classified bridge located on SR 249 in Defiance County over the St. Joseph river. 108690~|~1~|~1~|~01/IMS~|~Culvert split 102490~|~1~|~1~|~01/NHS~|~SR 7 3.55 to 5.20 Double microsurfacing 116254~|~1~|~1~|~01/SAF/STRE~|~Intersection improvement on POR SR 303 at Diagonal Rd in the City of Streetsboro. 98230~|~1~|~1~|~01/NFA~|~Installation of sidewalk and crosswalk markings on North Henry and Oldfield Road. 120772~|~1~|~1~|~01/NHS~|~Repair bridge carrying SR 7 over IR 470 ramp traffic from over height vehicle strike. 97061~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Replacement of Thermoplastic Pavement Markings in Licking, Muskingum, and Perry Counties. 81488~|~1~|~1~|~01/NHS~|~priority system resurfacing of BEL-7-20.08 to 23.45 includes pavement repair, guardrail and pavement marking 124051~|~1~|~1~|~01/NFP~|~Plan split for lighting replacement and upgrade at various locations in District 12 114852~|~1~|~1~|~01/SAF/S>2~|~Recessed - Wet Reflective pavement markings placed on completed projects. This plan split is for the HAM-22 locations. 114852~|~1~|~2~|~02/SAF/IMS~|~Recessed - Wet Reflective pavement markings placed on completed projects. This plan split is for the interstate locations. 114852~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 108865~|~1~|~1~|~01/MPO~|~Resurfacing of Smith Rd from Fairlawn East Corp to just east of Sand Run Road. 79011~|~1~|~1~|~01/SAF~|~Reconstruction of the existing roadway, including mill and fill, replace existing drainage, enclose the drainage ditch along the East side of Upper Valley Pike, South of SR 41. Replace/eliminate guardrail, upgrade/replace existing signnals and signage. Evaluate culverts/drainage structures for possible replacement on CR 327 in Clark County on CLA CR 327 0.55 to 1.95. 88983~|~1~|~1~|~01/STR~|~HIG SR41 0.00 - 7.36 resurfacing project80/20 split 88983~|~1~|~2~|~02/STR~|~HIG SR41 Brdgs F/Rehab:3600459 HIG SR41 0.4 Intersect: Straight Creek3600483 HIG SR41 4.49 Intersect: Trib Of Sunfish Creek3600521 HIG SR41 6.34 Intersect: Bakers Fk Of Brush Creek80/20 split 110608~|~1~|~1~|~01/NFP~|~Split for preventative maintenance signal work using for non-federal aid funded project 103123~|~1~|~1~|~01/STR~|~District Allocation (4PS7): Replace School Flasher Signs, Replace Flashing and Illuminated Beacons and Downlights 103123~|~1~|~2~|~02/SAF~|~Replace Battery Backups. 84508~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an mill and fill treatment on ATH 691 9.20-9.58. Urban other federal aid funded 80 federal/20 state. 84508~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment on HOC 278 0.34-5.38. Rural other federal aid funded 80 federal/20 state. 106653~|~1~|~1~|~01/NFA~|~Construction to replace Cardington-Western Road Bridge (SFN 5931509) over Whetstone Creek. SFN 5931509 replacement necessitates SFN 5933277 replacement. 98046~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - 100% State (LBP7) - on-going services during construction. 97529~|~1~|~1~|~01/BRF~|~Block PID Setup for Construction Change Orders. 96569~|~1~|~1~|~01/NFA~|~Funding for all work 115596~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 115596~|~1~|~2~|~02/NFA~|~Created for ODOT J&C funding. 110040~|~1~|~1~|~01/NFP~|~repair/replace culvert 115399~|~1~|~1~|~01/NFA~|~Created for J&C involvement 94811~|~1~|~1~|~01/IMS~|~Plan split for miscellaneous concrete repairs on the interstate system 86989~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a microsurfacing treatment. GAL 218 16.46-17.14. Urban other federal aid funded 80 federal/20 state. 86989~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. GAL 218 13.87-16.46. Rural other federal aid funded 80 federal/20 state. 117896~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing. 117742~|~1~|~1~|~01/SAF~|~Roundabout construction. All work is included in this plan split. 117742~|~2~|~2~|~02/STR~|~All bridge replacement work for SR 81 bridge over Patterson Ditch. Part 2 to this project, originally from PID 110593. 111533~|~1~|~1~|~01/MPO~|~TMACOG CMAQ funded items 111533~|~1~|~2~|~02/BRO~|~Plan Split for Local Major Bridge funded scope items. 111533~|~1~|~3~|~03/NFP~|~Plan Split for 100% Locally Funded Scope Items. 105303~|~1~|~1~|~01/NHS~|~Resurfacing TUS-36 105303~|~1~|~2~|~02/STR~|~Resurfacing US 36 from IR 77 to the end of the 4-Lane (SLM 3.85) 105303~|~1~|~3~|~03/BRO~|~Bridge deck sealing of SFN 7900155. 93806~|~1~|~1~|~01/MPO~|~Resurfacing of North Depeyster (CR-503) from East Main Street to Crain Avenue, in the City of Kent. 97975~|~1~|~1~|~01/IMS~|~Resurfacing of BEL-70 from SLM 15.72 to 19.17 to include asphalt concrete overlay, pavement repairs and pavement markings. 116315~|~1~|~1~|~01/IMS~|~Plan split for landscape maintenance in interchange areas in Franklin County. 109078~|~1~|~1~|~01/STR~|~Full depth pavement rehab on US 35 from 1.66 to 2.61. 93584~|~1~|~1~|~01/ENH~|~Add sidewalk in Village of Beverly through the Safe Routes to School Program, 100% Federal. Begin on 5th Street between McIntosh and Park Streets (180'); Park Street between 5th and Mitchell Streets. 98771~|~1~|~1~|~01/SAF~|~Upgrades to the existing Central Traffic System with advanced technology, within the City of Fairfield, OH. 98771~|~1~|~3~|~03/SAF~|~Plan Split for work at 2 signalized intersections that do not meet warrants (River & Cole and Resor & Augusta/Salem). Signals will be included in project by paid 100% locally. 98771~|~1~|~2~|~02/SAE/FAIR~|~This plan split is for 100% Safety items, i.e. work at the signalized intersection of SR-4 with Diversion Road. 99212~|~1~|~1~|~01/NFA~|~J&C , repaving business park. 115507~|~1~|~1~|~01/NFP~|~District wide herbicidal spraying. 112819~|~1~|~1~|~01/STR~|~Resurfacing SR 800 119059~|~1~|~1~|~01/NFA~|~All work included in this split. 105287~|~1~|~1~|~01/STR~|~Resurfacing of HOL-241 110922~|~1~|~1~|~01/SAF~|~Improve the intersection of DEL SR 605 and DEL CR 20 (Fancher Rd) 110922~|~1~|~2~|~02/SAF~|~Plan split for delay costs caused by utility companies 102481~|~1~|~1~|~01/STR~|~Resurfacing SR 516 from SLM 3.70 to 7.05 102481~|~1~|~2~|~02/S<2~|~Resurfacing SR 516 from SLM 7.05 to 7.16 108075~|~1~|~1~|~01/NHS~|~Rehab NHS bridge. 108075~|~1~|~2~|~02/STR~|~Rehab rural bridges. 122937~|~1~|~1~|~01/BRO~|~Emergency bridge repair. 101146~|~1~|~1~|~01/STR~|~Various bridges. 96246~|~1~|~2~|~02/S>2~|~STP>2. SLM 1.41-4.68 2517302 FRA-674-0248 over Little Walnut 2517272 FRA-674-0175 over Bishop Run 96246~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.00-1.41 2517221 FRA-674-0053 over Long Run 96246~|~1~|~3~|~03/S>2~|~2517302 FRA-674-2.48 concrete deck overlay 102023~|~1~|~1~|~01/IMS~|~Deck replacement and other associated bridge items. 84810~|~1~|~2~|~02/IMS~|~"02/IMS/CV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Culvert Liners or field paving of culverts under IR 70 in Licking County: 1) Lic-IR 70-25.82 CFN 4507025.82 (96"x202') under CR 288 (Midland Oil Road); 2) Lic-IR 70-24.22 CFN 450702422 (48"x234' CMP) carrying IR 70 over TR 334 Mt Hope; 3) Lic-IR 70-29.08 CFN 450702908 (96"x320' CMP) 84810~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 4504321 LIC IR70 25.98 Intersect: Wise Run; BR Eligible for Rehabilitation: Length=28 SD/FO(1) SR=49.6 DSR=" " 85363~|~1~|~1~|~01/STR~|~relocate road between HEN SR110 3.51-3.55 111640~|~1~|~1~|~01/NHS~|~Rehabilitate structure FRA-315-0278 over Olentangy River 111640~|~1~|~2~|~02/NHS~|~Resurface SR 315 from north end of bridge (King Ave) to SLM 3.39 (just south of ramp bridge) 94061~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - State Parks Funding 4BF7(100% State) - No CAP - Slip repair funded under ODOT/ODNR Park Maintenance Program. 121339~|~1~|~1~|~01/STR~|~STP Rural. 96801~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 105185~|~1~|~1~|~01/IMS~|~Split for bridge deck replacement over the interstate 117662~|~1~|~1~|~01/NFA~|~Created for J&C involvement 86891~|~1~|~1~|~01/STR~|~SR-19 from SLM 0.0 to SLM 3.29 SR-269 from SLM 4.37 to SLM 5.52 both routes in Ottawa County. 112026~|~1~|~3~|~03/ENH/KENT~|~Sidewalks and pedestrian enhancements. 112026~|~1~|~1~|~01/MPO/KENT~|~Reconstruct SR 59 (E Main St) from Willow Street to Horning Road. Includes installing raised median, replacing two signalized intersections with roundabouts, install bus pull-offs and install new storm and sanitary sewers in the City of Kent, Portage County, Ohio. 112026~|~1~|~2~|~02/NHS/KENT~|~TID funding for reconstruction. 112026~|~4~|~4~|~04/ERD~|~EV Stations 109841~|~1~|~1~|~01/NHS~|~BRO 32 0.00-8.15 109841~|~1~|~2~|~02/NHS~|~Bridge preventative maintenance. 121389~|~1~|~1~|~01/NHS~|~Plan split for resurfacing on SAN-20 121389~|~1~|~2~|~02/NHS~|~Urban Paving within City of Bellevue, resurfacing. No repairs, curbs, or sidewalks. 121389~|~1~|~3~|~03/NHS~|~100% Locally funded scope, including full depth repairs, curbs, and other scope not eligible for Urban Paving funds. 107642~|~1~|~1~|~01/STR~|~JAC 788 4.69 (4004388) 110836~|~1~|~1~|~01/S<2~|~Bridge Replacement 115818~|~1~|~1~|~01/IMS~|~Remove & replace mainline superstructure. 106119~|~1~|~1~|~01/SAE~|~Plan Split 122809~|~1~|~1~|~01/STR~|~Replacement of SFN 3005348 GUE-SR 313-10.88 115751~|~1~|~1~|~01/S<2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving project 115751~|~1~|~2~|~02/S<2/MID~|~Plan Split for the 100% City items on the urban paving project 108634~|~1~|~1~|~01/NFP~|~This project will include the widening and turning radius improvements at the throat of the new proposed street to Airstream's new facility. The proposal includes 280' west bound center turn lane along SR274 and a 280' east bound drop (right turn) lane into new street. 93592~|~1~|~1~|~01/IMS~|~Pavement from SLM30.70 in Wood to SLM 1.10 in Lucas. 93592~|~1~|~2~|~02/BRO~|~Various Bridges. 93592~|~1~|~3~|~03/BRO~|~Plan split for structure rehab of I 75 over CSX - Woo-75-31.11 pair 93592~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 115503~|~1~|~1~|~01/NFP~|~Created for J&C involvement 112695~|~1~|~1~|~01/S<2~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items): 112695~|~1~|~2~|~02/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?): 112695~|~1~|~3~|~03/S<2~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.): 103513~|~1~|~1~|~01/NHS~|~DSR# BEL-012 88964~|~1~|~2~|~02/STR~|~"02/STR/CV/ " - District Culvert Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Tunnel liner on the culvert on Mus-SR 93-01.16 located 0.31 miles north of TR 88, 88964~|~1~|~3~|~03/IMS~|~"03/IMS/CV/ " - District Culvert Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Application of a tunnel liner to the Culvert at Gue-IR 70-06.59 located .01 miles east of SFN 3001024 & 3001059 88964~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Tunnel Liner on 1) 3001415 GUE IR70 11.7 Intersect: I-70 Over Double A Run; Not BR Eligible for Rehabilitation: Length=12 SD/FO(1) SR=52.9 DSR=" "; 123124~|~1~|~1~|~01/NFP~|~All truck parking construction work to be included in this split. 119233~|~1~|~1~|~01/STR~|~Plan split for project to replace bridge PRE-122-2436 that carries SR 122 over Elk Creek. 113441~|~1~|~1~|~01/SAF~|~SAN-6 from SLM 14.53 to SLM 18.44: SAN-20 from SLM 14.59 to 15.29 and then from SLM 18.68 to 24.43; WIL-127 from SLM 1.05 to 1.94. For pavement markings of various locations on the NHS system. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. 113441~|~1~|~2~|~02/SAF~|~WOO-25 from SLM 15.82 to 18.29; WIL-127 from SLM 0.29 to 1.05. For pavement markings of various locations on the OTHER system. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. 113441~|~1~|~3~|~03/SAF~|~WOO-25 from SLM 18.29 to 20.20. For pavement markings of various locations on the OTHER Urban system. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. 113441~|~2~|~4~|~04/SAF~|~For pavement markings on the Interstate system in Allen and Hancock counties which are in ODOT District 1. This involves work on I-75 in Allen County from 15.77 to 23.12 an on I-75 in Hancock County from 0.00 to 3.22 and from 14.09 to 19.22. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal. 113441~|~2~|~5~|~05/SAF~|~For pavement markings on the NHS in ODOT District 1 on US 68 in Hancock County and US 23 in Wyandot County. This involves work on US 68 in Hancock County from 14.64 to 15.88 and on US 23 in Wyandot County from 6.50 to 10.28. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal. 96692~|~1~|~1~|~01/NFA~|~ATB Williamsfield Outpost, Construct new 3 Bay Cold storage to include electric for block heaters 92799~|~1~|~1~|~01/NHS~|~Pavement Marking 75730~|~1~|~1~|~01/IMS~|~Provide for lane continuity in overlap section of IR74/IR275. 75730~|~1~|~2~|~02/IMS~|~Add fourth lane on overlap of IR74 and IR275. Reconfigure eastern interchange of IR74/IR275 to provide lane continuity, that is, IR275 exit on the right instead of the left going eastbound. 105167~|~1~|~1~|~01/IMS~|~To upgrade the highway lighting hardware on IR 470 at mile marker 3.22 105167~|~1~|~2~|~02/NHS~|~This plan split is for the locations on SR 7 in Columbiana and Jefferson counties and on US 250 in Tuscarawas county. 84839~|~1~|~2~|~02/S<2/LOR~|~80/20 District Allocation/City of Lorain 84839~|~1~|~1~|~01/NHS/LOR~|~NHS 80/20 District Allocation/City Funding 84839~|~1~|~3~|~03/S<2/LOR~|~100% City of Lorain 119060~|~1~|~1~|~01/NFA~|~All work included in this split. 93206~|~1~|~1~|~01/NHS~|~Remove and replace existing microsilica and latex modified concrete deck overlay on SFN 5704685 MOT IR 70 (Number Nine Road) 93206~|~1~|~2~|~02/BRO~|~Remove and replace existing microsilica and latex modified concrete deck overlay on SFN 5703484 MOT US 40 1883 over Chessie SYS RR. 115854~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..at various locations in D10. 107661~|~1~|~2~|~02/S<2/VAN~|~Resurfacing in the City of Van Wert. Federal funds from the District budget with the 20% match provided by the City of Van Wert. All resurfacing on SR 118. Resurfacing on US 127 from the CDX RR at 9.94 to where US 127 leaves US 127 at 11.33 and then on the left side of the road from 11.43 to 11.63. 107661~|~1~|~3~|~03/S<2~|~Resurfacing inside of the Van Wert Urban Area but outside of the City of Van Wert. Federal and State funds from the District budget. Resurfacing on US 127 on both sides of the road from 11.33 to 11.43, on the right side of the road from 11.43 to the north Urban Area boundary where US 127 leaves the City of Van Wert on the left side at 11.63. 107661~|~1~|~4~|~04/NFA~|~Resurfacing on SR 709 in Van Wert County which is a Rural Minor Arterial which cannot use federal funds for resurfacing. All funds from the District budget. 107661~|~1~|~1~|~01/STR~|~Resurfacing in Van Wert County using district preservation funds. Work on US 127 from the North Urban Area Boundary where US 127 leaves the City of Van Wert on the left side at 11.63 to the end of the project at Marsh Road 12.25. Also, all resurfacing on US 224. 107661~|~1~|~5~|~05/NFP/VAN~|~Items funded 100% by the City of Van Wert such as pavement repairs and auxiliary pavement markings. 88830~|~1~|~1~|~01/NHS~|~Resurfacing on the National Highway System (NHS) 88830~|~1~|~2~|~02/SAE~|~Recessed-Wet Reflective Pavement markings (and WR Work Zone PM?s) funded partially be Safety (Delta Cost portion). The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. This difference in cost is the delta cost. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal. 88830~|~1~|~3~|~03/NFP~|~Repair piers, barrier wall, and asphalt wearing surface due to a collision. 88830~|~1~|~4~|~04/NFA~|~retroactive fuel price adjustment 118783~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs 99563~|~1~|~1~|~01/S<2~|~Rehab Local bridge. 108779~|~1~|~1~|~01/NFP~|~All work in this project. 115001~|~1~|~1~|~01/S50~|~Traffic Signal Upgrades. 102978~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CLA SR 72 SLM 0.00 to 4.82. 102978~|~1~|~2~|~02/S>2~|~Smooth seal on large urban route: CLA SR 72 SLM 4.82 to 6.42 114944~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate roadways 114944~|~1~|~2~|~02/NHS~|~Bridge Repair NHS 114944~|~1~|~3~|~03/STR~|~Bridge Repair STP Rural 99429~|~1~|~1~|~01/NFP~|~Widening of CR17 (Cleveland Massillon Road) from Shannon to Weber, in the City of Norton, Summit County, Ohio. 109635~|~1~|~1~|~01/STR~|~Emergency repair on BRO 41 4.18 85526~|~1~|~1~|~01/IMS~|~Plan split for system preservation paving work. 93818~|~1~|~1~|~01/S>2~|~Resurfacing in the City of New Franklin. STP Urban Segment from SLM 4.91 to SLM 5.18. 93818~|~1~|~2~|~02/STR~|~Resurfacing in the City of New Franklin. Rural segment from SLM 2.38 to SLM 4.91. 117434~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 96318~|~1~|~2~|~02/S<2~|~Resurfacing: Urban SLM 0.57 - 1.10 (Ashland) 96318~|~1~|~1~|~01/STR~|~Resurfacing: Rural ASD-58-1.10 to 14.09, MED SR 301 8.61-10.17 96318~|~1~|~3~|~03/STR~|~Structure Work: ASD-58-1.18, ASD-58-4.22, ASD-58-4.43, ASD-58-5.94, ASD-58-6.26, ASD-58-7.98, ASD-58-13.30, MED-301-9.84 96318~|~1~|~4~|~04/S<2~|~Structure Work: ASD-58-0.60 100302~|~1~|~1~|~01/STR~|~BRO-505-6.03 24980~|~1~|~1~|~01/NHS~|~Replace existing box structure (JEF-7-3095, SFN 4101561) with new structure. The structure carries SR 7 over a coal conveyor and coordination will be required with the conveyor owners. 96958~|~1~|~1~|~01/MPO~|~Mill & Fill on CR 39. 100615~|~1~|~2~|~02/NFA~|~Asphalt resurfacing with repairs on HOL-754 from 0.96 to 6.72 100615~|~1~|~1~|~01/STR~|~Asphalt resurfacing with repairs on HOL-754 from 0.00 to 0.96. 91567~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (TUS-93-0336, SFN 7904029) with a new slab bridge or four-sided concrete box. 115038~|~1~|~1~|~01/ERD~|~Ferry Funds plan split 105902~|~1~|~1~|~01/NHS~|~Plan split for urban paving work on the NHS 105902~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 123964~|~1~|~1~|~01/S50~|~Resurfacing along CR 46 from SR 7 to TR 376 - 80% (4TA7/BH11) Federal funds/20% Local. 97776~|~1~|~1~|~01/BRF~|~Replace super structure SFN 5738121 MOT CR46-0124 Hample Road over stream. 93539~|~1~|~1~|~01/NFA~|~Demolish and construct new salt building - 100% state facility funding 113488~|~1~|~1~|~01/MPO~|~Milling and resurfacing on the walking/bike path in Tom Cloud Park in Huber Heights. 86479~|~1~|~1~|~01/NFA~|~100% local funding for all work 86479~|~1~|~2~|~02/NFP~|~Bridge work on SFN 1800841; Herman Ave over US-6 116836~|~1~|~1~|~01/ENH/POLA~|~Construction of a shared multiuse path. 111320~|~1~|~1~|~01/NFP~|~Reconstruct S. Industrial Parkway. 121576~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items in construction 97156~|~1~|~1~|~01/NFP~|~Construction of a parking lot next to ATB SR 307 11.15 at the Lampson Reservoir. 115841~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2028. 96988~|~1~|~1~|~01/NFP~|~Added plan split due to funding 93606~|~1~|~1~|~01/NFA~|~Sidewalk construction in the City of Hudson. 112871~|~1~|~2~|~02/STR~|~MAD-56 from 0.00 to 4.69 112871~|~1~|~1~|~01/S5K~|~MAD-56 from SLM 4.69 to 6.19 116014~|~1~|~1~|~01/NHS~|~All work in this project. Funds will be from the Geologic Site Management (GSM) program until the cap is reached then funds from the District Preservation Program budget will be used. 83059~|~1~|~2~|~02/BRO~|~CO CC 01 Brdg plan split added for $20,137 for SFN 4401956 83059~|~1~|~1~|~01/STR~|~CO CC 01 plan split added. Moved $20,137 to CO CC 01 Brdg for SFN 4401956 93442~|~1~|~1~|~01/NHS~|~Turn lanes on State Route 43 between State Route 261 and Summit Street. Signal interconnect of SR261, Beryl Drive, Cherry Street, and School Street, in the City of Kent. Including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Westbound left turn lane on SR-261 at Summit Street in the City of Kent. 100823~|~1~|~1~|~01/IMS~|~Double microsurfacing to SUM IR 77 19.51 to 21.99 84509~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 160 3.50-14.67. Rural other federal aid funded 80 federal/20 state. 84509~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment on GAL 160 3.07-3.50 and GAL 588 10.87-11.74 using a mill and fill treatment. Urban other federal aid funded 80 federal/20 state. 121985~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 107979~|~1~|~1~|~01/SAE~|~Repair of an existing uphill slide along Wolfpen Pleasant Hill Road by installing a 200' long drilled pier retaining wall. 106810~|~1~|~2~|~02/STR~|~Bridge painting project. ATH 13 0.40 (SFN 0500070), ATH 13 2.69 (SFN 0500135) and ATH 13 6.87 (SFN 0500186). Rural other federal aid funded 80 federal/20 state. 106810~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 33 11.07 LT (SFN 0500720) and RT (SFN 0500755), ATH 33 15.60 LT (SFN 0505927) and RT (SFN 0505900), ATH 33 16.27 LT (SFN 0500941) and RT (SFN 0501018). NHS route funded 80 federal/20 state. 113574~|~1~|~1~|~01/S>2~|~Split for bridge work related to the replacement of the existing structure 117730~|~1~|~1~|~01/NFP~|~Elongation of turn lanes on SR 161 eastbound off ramp to Beech Road 107615~|~1~|~1~|~01/NHS~|~FUL-20-9.14 107615~|~1~|~2~|~02/BRO~|~FUL-20A-2.53 114498~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 117011~|~1~|~1~|~01/NFA~|~Slide repair 107853~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-41-21.99-23.54 107853~|~1~|~2~|~02/S<2~|~Urbanized Area Plan Split: FAY-753-12.58-12.78 107853~|~1~|~3~|~03/NHS~|~Priority System NHS Plan Split: FAY-35-0.00-2.58 107013~|~1~|~1~|~01/NFP~|~Parking Lot Plane and Pave and Mohican Lodge. 119750~|~1~|~1~|~01/ENH/WIL~|~Construction of a shared use path along Davids Drive from SR 134 for approximately 2.2 miles. 117895~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing. 104130~|~1~|~1~|~01/STR~|~Storm Sewer repair on the campus of Central State 98570~|~1~|~1~|~01/NHS~|~Two Lane Resurfacing 98570~|~1~|~3~|~03/SAF~|~Funding for center Line rumble stripes Outside of Litchfield, Mallett Creek, and Medina. 98570~|~1~|~2~|~02/NHS~|~BRIDGE WORK: MED-SR-18 06.590 (SFN 5200636) OVER MALLET CREEK Preventive Maintenance:? Expansion joint repair/replacement (048) ? Deck Sealing (051) Minor Rehabilitation ? Bridge railing upgrade/repair (061) MED-SR-18 06.870 SFN (5200660) OVER CSX RR Preventive Maintenance ? Deck Sealing (051) Reactive Maintenance ? Conc patch(non-deck) (010) ? Deck patching(conc) (049) ? Exp jt repair/repl (048) Minor Rehabilitation ? Bridge railing upgrade/repair (061) 86594~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn SR763, project is located 0.78 mile south of the intersection with SR353. It is proposed to replace the deteriorating and structurally deficient corrugated metal arch. 0804207 BRO SR763 11.92 Intersect: Trib W Fork Eagle Creek100% state 01/NFA/BR/State 100815~|~1~|~1~|~01/NHS~|~Resurfacing of ATB US 20 from 6.35 to 10.41. 100815~|~1~|~2~|~02/S<2~|~Resurfacing of ATB SR 84 from 14.23 to 19.75. 100815~|~1~|~3~|~03/NHS~|~Minor rehab to linked structure > 20' span. 101248~|~2~|~4~|~04/ENH/HUBB~|~Adding sidewalks along Myron St in the City of Hubbard. 101248~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' span. 101248~|~1~|~1~|~01/NHS~|~Resurfacing. 101248~|~1~|~2~|~02/NHS~|~Minor bridge work. 92630~|~1~|~1~|~01/NFA~|~Project consists of environmental remediation of the ODOT Miamitown Outpost. Remediation consists of chemical injection of material to neutralize underground contamination. 117566~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 147 9.93. Drilling for a geotechnical exploration. 103654~|~1~|~1~|~01/BRO~|~Replace Bridge 6170~|~1~|~1~|~01/S<2~|~Urban paving - 80/20 - MPO/City of Elyria 113198~|~1~|~2~|~02/NHS~|~Pavement work on DEL-36-17.64-18.41 to clean up MOT lane shifts. 113198~|~1~|~1~|~01/IMS~|~Replace superstructure on DEL SR 36 over IR 71 113198~|~1~|~3~|~03/NHS~|~Aesthetic treatment of vandal fencing to be paid 100% by Berkshire Township 107831~|~1~|~1~|~01/STR~|~All the work in the resurfacing project is in this plan split. 88224~|~1~|~1~|~01/MPO~|~WIDEN AND RECONSTRUCT ROADWAY on South Dixie Drive from Cresthill Drive to Elva Court FROM 3 TO 5 LANES, INCLUDE A TAPER AT ELVA COURT 102976~|~1~|~1~|~01/NHS~|~Microsurface on:CHP SR 4 SLM 7.98 to 12.24 102976~|~1~|~3~|~03/S<2~|~Microsurface on:LOG SR 117 SLM 0.00 to 2.01SHE SR 29 SLM 14.47 to 14.55 102976~|~1~|~2~|~02/STR~|~Microsurface on:LOG SR 117 SLM 2.01 to 5.83SHE SR 29 SLM 7.64 to 14.47SHE SR 274 SLM 14.87 to 15.23 111125~|~1~|~1~|~01/STR~|~Slope failure on WOO-281 over I-75 86744~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for all work using TRAC funds. 109544~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/PV for D05 Crack Sealing FY2028 82438~|~1~|~1~|~01/IMS~|~Pavement planing and resurfacing with asphalt concrete on Interstate 75 from SLM 7.29 to the South Corporation Limit of Dayton (SLM 10.42). 117099~|~1~|~1~|~01/ENH/CCEO~|~"01/ENH/OT/CCEO" - construction of shared use pathway along CR 621. 117099~|~2~|~2~|~02/NFP/CCEO~|~100% Local Plan Split for non-Federal funded resurfacing work. 93182~|~1~|~1~|~01/IMS~|~Plan Split for SUM IR 76 0.00 to 15.42 108513~|~1~|~1~|~01/STR~|~Bridge rehab. 124219~|~1~|~1~|~01/NHS~|~Interchange Improvement at Orange Rd and US 23 83555~|~1~|~1~|~01/SAF~|~Widening SR 39 from the RJ Corman railroad tracks to 7th Street to provide a two way left turn lane. Widening the roadway will provide left turning vehicles a safe refuge while turning from SR 39 into drives and side streets, thus reducing opportunities for rear-end collisions. Using 80% federal safety funds (4HJ7) and 20% Local match (4BG7) (City of New Philadelphia). 108325~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MRG 78 13.90. DSR MRG-005. Funded 100% federal. 122321~|~1~|~1~|~01/ERD/BARB~|~Sidewalks from E. Cassell Ave to 1 St NE. 122321~|~1~|~2~|~02/ERD/BARB~|~Sideswalks from E. Tuscarawas Ave to E. Cassell Ave, E. Cassell Ave, E Park Ave, and E Tuscarawas Ave. (CDBG eligible) 112940~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-47-2.95-8.34 107126~|~1~|~1~|~01/NHS~|~Urban Paving - City of Middletown - Germantown Road to N. Corp. 107126~|~1~|~2~|~02/NHS/MIDD~|~Items to be covered 100% by the City of Middletown. 117787~|~1~|~1~|~01/NFP~|~Reconstruction of the Rest Area Parking lot, Sidewalks, ADA ramps and other miscellaneous items 92830~|~1~|~1~|~01/S<2/DEF~|~This split is for work elibible for funding from the Small Cities Program. The City of Defiance will provide the non-federal funds. 92830~|~1~|~2~|~02/S<2~|~This is for urban paving work. The federal funds are from the District Preservation Program SAC 4PF7, and the 20% match is provided by the City of Defiance SAC LNTP. 97442~|~1~|~1~|~01/SAF~|~INstall overhead flashing beacons and converting 2-way stop to all-way stop intersection. 116653~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr MED SR 18 15.05 TO 15.92. 116653~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs MED-57-17.80 to 20.718Bridge maintenance work included with this plan split. 118471~|~1~|~1~|~01/BRF/WCEO~|~Replacement of Bridge WAR-CR 134-3.76 (SFN: 8332991) with a three-sided precast culvert. 105000~|~1~|~1~|~01/SAF~|~This split will cover all work to install cable rail. 95849~|~1~|~1~|~01/NHS~|~100% State Funds - Sinkhole repair 87757~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Cracksealing on Lic-IR 70-09.65 to 15.96 87757~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Fai US 33 22.39 to 24.86; 2) Lic US 40 00.46 to 04.70; 3) Mus SR 16 11.70 to 14.86; 4) Mus SR 60 13.02 to 15.02; 87757~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Mus US 22 18.14 to 19.78; 2) Mus SR 60 11.96 to 13.02; 87757~|~1~|~4~|~04/STR~|~"04/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Fai SR 37 25.27 to 28.20; 2) Mus US 22 19.78 to 26.62; 3) Mus SR 60 08.03 to 11.96; 4) Mus SR 146 25.65 to 33.76; 5) Per SR 37 00.00 to 08.30; 87757~|~1~|~5~|~05/NFA~|~"05/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Cracksealing on: 1) Mus SR 313 00.00 to 07.13; 2) Mus SR 376 00.00 to 05.30; 107203~|~1~|~1~|~01/SAF~|~Signal replacement. 110295~|~1~|~1~|~01/MPO~|~To provide sidewalks on both sides of Solida Road, through the Village of South Point. 106558~|~1~|~1~|~01/NFP~|~Plan Split 77886~|~1~|~3~|~03/NHS~|~Plan Spit for SFN 7803249 and 7803273 TRU US 62 8.73 L&R over Yankee Creek. 77886~|~1~|~4~|~04/NHS~|~Plan Split for SFN 7803133 & 7803192 TRU US 62 04.82 L&R over Little Yankee Creek 77886~|~2~|~5~|~05/IMS~|~Widen and replace supersturcture for SFN 7804326 and SFN 7804350 TRU-IR 80-9.56 L&R. 77886~|~1~|~2~|~02/NHS~|~Plan Split for TRU US 62 4.80 to 9.26 77886~|~1~|~1~|~01/NHS~|~Plan Split for TRU US 62 4.58 to 4.80. 98832~|~1~|~1~|~01/IMS~|~Split for upgrade work 98832~|~1~|~2~|~02/IMS~|~Split for guardrail repair 115729~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of LIC SR 79 04.57 (SFN 4508436) carrying SR 79 over South Fork Licking River. 99471~|~1~|~1~|~01/MPO~|~Resurfacing of Cleveland Avenue (CR-66) from Wright Road to SUM County line, in Lake Township, Stark County, Ohio. 84988~|~1~|~2~|~02/NHS~|~100% utility cost for waterline replacement 84988~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for the slope repair 115500~|~1~|~1~|~01/BRF~|~Bridge replacement 121071~|~1~|~1~|~01/STR~|~Resurfacing SR 331 123505~|~1~|~1~|~01/IMS~|~Partial Depth Pavement Repairs ASD-71-0.00 to 8.00 and RIC-71-15.455 to 20.636 97410~|~1~|~1~|~01/NFA~|~Replace SFN 7633904 STA-TR 118-6.05 Freed St SE over Hugle Run 97410~|~1~|~2~|~02/BRO/NCAN~|~Replace SFN 7666187 STA-TR 196-0.06 Easthill St SE over W Branch Nimishillen Creek (City of North Canton) 97410~|~1~|~3~|~03/S>2/MASS~|~Replace SFN 7670907 STA-MR 1400-0.55 17th St NE over Sippo Creek (City of Massillon) 114979~|~1~|~1~|~01/STR~|~STP Rural - Bridge rehab including SDC overlays, patching, deck edges, pier encasement, etc. 114979~|~1~|~2~|~02/IMS~|~Interstate - SDC overlay 114979~|~1~|~3~|~03/STR~|~Culvert repair 107580~|~1~|~1~|~01/NHS~|~Plan Split for pavement resurfacing on BUT-4 107011~|~1~|~1~|~01/IMS~|~Mowing Contract 121506~|~1~|~1~|~01/IMS~|~Slide repair along HAM-275 106708~|~1~|~1~|~01/S>2~|~Replacing the linked culvert. 106708~|~1~|~2~|~02/NHS~|~Median catch basin repairs along TRU SR 5 from 12.43 to 12.93. 92710~|~1~|~1~|~01/MPO~|~Tallmadge Rd CR18 9.21-10.4 92710~|~1~|~2~|~02/MPO~|~Tallmadge Rd CR18 9.01-9.21 87034~|~1~|~1~|~01/SAF~|~Maintenance contract for highway lighting in District 8 for FY2016 77372~|~1~|~3~|~03/NHS~|~Structure replacement, added capacity (40% of cost) 77372~|~1~|~4~|~04/NHS~|~Structure replacement at 100% State funds (Part 3) 77372~|~1~|~5~|~05/IMS~|~Replace deck on structure FRA-70-1301L (Existing width) 77372~|~1~|~6~|~06/MPO~|~MORPC/Columbus funding for aesthetic enhancements on High St and Third St bridge caps, Fourth St bridge, also landscaping along Fulton, Third and Fourth Streets 77372~|~1~|~1~|~01/IMS~|~Pavement reconstruction, both existing and widening for items not specifically identified in other splits. Includes work on High St, Fulton St., Third St., Fourth St. and Livingston Ave. 77372~|~1~|~8~|~08/ENH/COL~|~Incremental items - Columbus to pay the difference above standard items. Granite curbs, brick crosswalks, light poles, signal poles, pedestal crosswalk signs 77372~|~1~|~2~|~02/IMS~|~Structure replacement, no added capacity (60% of cost except 100% of FRA-70-13.01R) 77372~|~1~|~7~|~07/NHS/COL~|~Items to be paid with 100% City of Columbus funding 77372~|~1~|~9~|~09/IMS/Util~|~Utility work to be paid 100% by each utility as a lump sum contribution. Any overages will be paid with District Preservation funds. 118859~|~1~|~1~|~01/NFA~|~plan split. 104947~|~1~|~1~|~01/NHS~|~FRA-23-0.25 L&R deck overlay and repairs 109857~|~1~|~1~|~01/NHS~|~PIK 32 20.14-28.42 120387~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 114836~|~1~|~1~|~01/S>2~|~FRA-674-0.00 to 2.05, 2.14 to 2.21 100865~|~1~|~1~|~01/IMS~|~Replacement of deteriorated noise panels. 96463~|~1~|~1~|~01/NFA/UTLC~|~"01/NFA/PV/UTLC" - Safety High Risk Rural Roads Funding - 4HJ7 (90% Federal) / 4BG7 (10% Local) - $265,000.00 Federal CAP - Resurfacing - Lic-TR 35-00.00 to 02.45; 100992~|~1~|~1~|~01/NHS~|~Smooth Seal SR 725 and SR 741 in Montgomery County: MOT SR 725 SLM 15.00 to 18.18 MOT SR 741 SLM 0.00 to 3.61 124948~|~1~|~1~|~01/MPO~|~Plan split 1, for OKI pilot paving program eligible expenses. 110518~|~1~|~1~|~01/BRO~|~Bridge plan split 111316~|~1~|~1~|~01/MPO~|~Minor bridge work > 20' structure. 113852~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 99765~|~1~|~1~|~01/STR~|~Scioto FLAP Phase 1 CR10 (2.4-3.7) 121706~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs MED-71-0.00 to 6.062 90877~|~1~|~1~|~01/S<2/NEWC~|~"01/S<2/OT/NEWC" New Concord SRTS project to replace and add new sidewalk 123534~|~1~|~1~|~01/IMS~|~IMS conduits linked 123534~|~1~|~2~|~02/S>2~|~Lrg urban Conduits linked 88962~|~1~|~1~|~01/NFA~|~Salt storage building demolition 114661~|~1~|~1~|~01/NFP~|~PM (A) FY27 113650~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - 80% Federal (4HJ7) / 20% State (4BC7) - intersection upgrade of SR 204 and Tollgate Road. 101665~|~1~|~1~|~01/NHS~|~Established plan split as "01/NHS/BR/ " for Mus-93-12.84 95972~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 114353~|~1~|~1~|~01/STR~|~Resurfacing various county roads. 107573~|~1~|~1~|~01/IMS~|~2020 Mowing Contract 119037~|~1~|~1~|~01/NFA~|~MOE-TR2214-0.06 Bridge Replacement 106413~|~1~|~1~|~01/SAF~|~Install a modern roundabout at SR-132 and Chapel Rd. 122597~|~1~|~1~|~01/ERD~|~Reconstruct a 15-foot high (120 feet long) retaining wall that is failing along Sycamore Street. 99373~|~1~|~1~|~01/NHS~|~SFN 5700396, MOT-4-1006 on Opossum Creek & SFN 5700426, MOT-4-1046, on tributary of Opossum Creek - remove asphalt wering surface and water proofing. Place SDC non-composite wearing surface system with strip seal expansion joints. Patch abutments with Item 519 using (SCC) self consolidating concrete and seal with epoxy urethane. 120483~|~1~|~1~|~01/S>2~|~Bridge replacement 120483~|~1~|~2~|~02/S>2~|~Add sidewalks on Elbee to connect to bridge 113132~|~1~|~1~|~01/IMS~|~Split for interstate PM work 113132~|~1~|~2~|~02/S>2~|~Plan split for preventative pavement maintenance work on General system 100583~|~1~|~1~|~01/NFP~|~Landscaping project at D10 Headquarters Building. Non federal aid project funded 100% state. 107782~|~1~|~1~|~01/S<2~|~Resurfacing HUR 250: 0.75-0.77 0.86-1.20 1.26-1.29 4.77-5.10 107782~|~1~|~2~|~02/S<2~|~Resurfacing 107782~|~1~|~4~|~04/S5K~|~Bridge maintenance / rehabilitation SFNs 3902250 and 3902048 107782~|~1~|~3~|~03/S5K~|~Pavement repairs and other 100% city items. 107782~|~1~|~5~|~05/ENH~|~Curb ramps in Norwalk 96882~|~1~|~1~|~01/BRF~|~Bridge replacement--CEAO 110219~|~1~|~1~|~01/NHS~|~PIK 23 (8.18) & Market St. Signal Upgrade 99037~|~1~|~1~|~01/SAF~|~200 ft south of SR 571 (SLM 3.99) to 650 ft north of SR 571 (SLM 4.15) on Arcanum-Bears Mill Road (CR 34) - Realign Arcanum-Bears Mill Road approaches at SR 571 to reduce the intersection skew angle. This is to address safety concerns with pattern of angle crashes at the intersection. 118730~|~1~|~1~|~01/BRO/SUCE~|~Bridge rehab. 103395~|~1~|~1~|~01/STR~|~Slide repair. 121046~|~1~|~1~|~01/NHS~|~Resurfacing 106965~|~1~|~1~|~01/NHS~|~LAW 52 0.00-11.58 sign maintenance. 90040~|~1~|~1~|~01/S<2~|~Urban Paving Program Milling of existing roadway and resurface with Asphalt Conrete in Celina from Portland Street SLM 11.46 to Main Street, US 127 SLM 12.23. 83787~|~1~|~1~|~01/SAF~|~Pavement marking project at various locations for FY 2013. 100% state funded. 94037~|~1~|~1~|~01/NFA~|~ It is proposed to replace the culverts on Roads 4, 6, 13, 18, 19 & 23. Once inhabited by the Shawnee Indians, Shawnee State Forest came into existence in 1922 with the purchase of 5,000 acres of land which had been cut over for timber and ravaged by fire. During that same year, land acquisition was begun for the Theodore Roosevelt Game Preserve. Shawnee State Forest, also called "The Little Smokies of Ohio," has developed into the largest of the 20 state forests, with over 60,000 acres. Nearly 8,000 acres of the forest have been designated as wilderness. 100% state01/NFA/OT/state 107551~|~1~|~1~|~01/STR~|~District crack sealing 90291~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing of State Route 48 within the City of Clayton .06 miles south of the southern corporation limit (SLM 19.04) to the Englewood South Corporation Limit (SLM 21.10) 91769~|~1~|~1~|~01/IMS~|~Concrete deck overlaySFN, FRA-71-18.54, over I-670 & RR yards01/IMS/BR/ 98557~|~1~|~1~|~01/SAF~|~Improve intersection of CR 3 at CR 22 and interchange of CR 3 and IR 70 98557~|~1~|~2~|~02/SAF/COC~|~Added plan split 2 for the MORPC funds 98557~|~1~|~3~|~03/SAF/COC~|~Added plan split 3 for 100% local items 117923~|~1~|~1~|~01/NFP~|~Superstructure replacement. 93852~|~1~|~2~|~02/STR~|~Resurfacing of SR 185 from .04 mile East of Catalpa Drive SLM 4.97 South and East to the intersection with State Route 47 SLM 5.45. 93852~|~1~|~1~|~01/STR~|~Relocation of State Route 185 from 0.04 mile East of Catalpa Drive (SLM 4.97) South and East to the intersection with State Route 47 (SLM 5.45). A distance of 0.25 mile. The existing State Route 185 btween SLM 4.97 and the overlap with State Route 47 (SLM 5.45) will be abandoned and/or vacated to the Village of Versailles. 101826~|~1~|~1~|~01/NFA~|~The PORT is assisting Muskingum Cty and The Wilds to rebuild and repair two existing roads Zion Ridge Road and International Drive for traveling public and trucks 123778~|~1~|~1~|~01/STR~|~stp rural 103191~|~1~|~1~|~01/S<2~|~Storm Sewer Replacement 99502~|~1~|~1~|~01/S<2/HEAT~|~City of Heath Paving Funds - 4TA7 (80% Federal) / 4BG7 (20% Local) - (See CAP Comments) - Resurfacing of portions of Linnville Road (CR 311) 122955~|~1~|~1~|~01/MPO~|~Plan split for the eligible rehabilitation work. 99934~|~1~|~1~|~01/S<2/Zane~|~"01/S<2/PV/ZANE" - City of Zanesville resurfacing project utilizing 4TA7 funding 117181~|~1~|~1~|~01/STR~|~Split for paving on the Rural STP system 117181~|~1~|~2~|~02/S5K~|~Split for resurfacing on the STP system 106270~|~1~|~2~|~02/S>2~|~City of Columbus urban paving plan split - 16.21-16.37. 106270~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FRA-317-16.37-18.52 121294~|~1~|~1~|~01/S5K~|~All roundabout construction work included in this split. 80000~|~1~|~1~|~01/BRO~|~4805119 LUC SR184 8.32 Intersect: Ann Arbor R.R. 4805127 LUC SR184 8.4 Intersect: Norfolk Soutern/Stickney 107987~|~1~|~1~|~01/NFP~|~Various bridges. 103225~|~1~|~1~|~01/NFA~|~Replacement of a County Bridge. 119733~|~1~|~1~|~01/STR~|~Intersection Improvement project utilizing Oil & Shale Funds at 100%. 122804~|~1~|~1~|~01/NFP~|~Parking lot improvements at Goodyear Heights Metro Park. 116240~|~1~|~1~|~01/STR~|~Chipseal in SCI. 123123~|~1~|~1~|~01/BRF~|~Rehab SFN 2563126 that carries Ohio Center Way over CSX and Norfolk Southern rail lines. 123123~|~2~|~2~|~02/NFA/COL~|~Rehab SFNs 2563150, 2563177 and 2563207 that carry Ohio Center Way over CSX and Norfolk Southern rail lines. 82427~|~1~|~2~|~02/STR~|~District Allocation funded culvert replacement 82427~|~1~|~3~|~03/S<2~|~District Allocation 4PF7/4PS7 for cost above Geotech Funds cap 82427~|~1~|~1~|~01/STR~|~Geotech (4SF7/4SS7) Funded Slope stabilization / capped @ $597,635 116007~|~1~|~1~|~01/NFP~|~Tree Cutting. 83015~|~1~|~1~|~01/S>2~|~Correction of embankment slide location at SUM-IR 480 at SR82. 95795~|~1~|~1~|~01/S>2~|~from SLM 0.00 to SLM 3.38 96010~|~1~|~1~|~01/NHS~|~SFN 4805224 89343~|~1~|~1~|~01/ENH~|~Begins at existing Hockhocking-Adena bikeway near town of Eclipse and continues 0.8 miles to Athens High School. Federal 80%/Local 20%. (TEA) Enhancement Program. 123726~|~1~|~1~|~01/STR~|~Plan split for resurfacing work on the general system 96780~|~1~|~1~|~01/IMS~|~Raised Pavement Markers 114665~|~1~|~1~|~01/NFP~|~FY27 RPM 103748~|~1~|~1~|~01/BRO~|~SFN 4001206 JAC-93-15.48 over JAC-32-10.85 105135~|~1~|~1~|~01/STR~|~100% State funded Herbicidal spraying project, District-wide. 107552~|~1~|~1~|~01/STR~|~Spot Paving 96104~|~1~|~1~|~01/NHS~|~Repair/Replace the lighting on US52 around the Ashland Bridge. 97581~|~1~|~1~|~01/IMS~|~Slide repair to SUM-IR 271-10.21. 91923~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. Fund for 1 year Guardrail ding and dent repair 100637~|~1~|~1~|~01/S>2~|~Plan split for the Urban portion of BUT SR 177 SLM 2.12 - 3.20 100637~|~1~|~2~|~02/STR~|~Plan split for the Rural portion of BUT SR 177 SLM 3.20 - 8.48 116498~|~1~|~1~|~01/S>2~|~Pave Invert 116498~|~1~|~2~|~02/S<2~|~Pave Invert 116498~|~1~|~3~|~03/STR~|~Pave Invert 116498~|~1~|~4~|~04/IMS~|~Conduit work on Interstate 95716~|~1~|~2~|~02/NHS~|~Bridge plan split 95716~|~1~|~3~|~03/NHS~|~LUC-24 from 11.53 to 12.62 (Safety) 95716~|~1~|~1~|~01/NHS~|~HEN-24 from SLM 0.00 to SLM 4.75 100886~|~1~|~1~|~01/STR~|~JAC 139 3.17 (SFN4002490) 93078~|~1~|~1~|~01/SAF~|~Center Road CR293 1.06-2.95 114738~|~1~|~2~|~02/S5K~|~Overlay on ROS 50. 80/20 Fed/Local 114738~|~1~|~1~|~01/S5K~|~Overlay project. 114738~|~1~|~3~|~03/S5K~|~100% local items. 105694~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 2 lane highways. 117697~|~1~|~1~|~01/ERD/MAD~|~Reconstruction of Miami Avenue from Naomi Avenue to Euclid Avenue. 117697~|~1~|~2~|~02/SAF~|~modification of the grade crossing , including HAWKE signal and modification to the signal at Miami and Dawson Rd. 101698~|~1~|~1~|~01/S<2~|~STP 80/20 District Allocation/City of Bellevue 101698~|~1~|~2~|~02/S<2~|~STP 100% City of Bellevue 101698~|~1~|~3~|~03/S<2~|~STP District Allocation 101698~|~1~|~4~|~04/S<2~|~STP Bridge: HUR-269-6.29 109721~|~1~|~1~|~01/STR~|~All work in this project. Replacement of three culverts. Federal and state funds from the District Preservation Program budget. 104086~|~1~|~1~|~01/BRF~|~Bridge Replacement, Covert Road. 89246~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 119497~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes. 119098~|~1~|~1~|~01/STR~|~Resurfacing. 109339~|~1~|~1~|~01/NFP~|~ODNR resurface day-use area at Mary Jane Thurston State Park 103428~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7 108934~|~1~|~1~|~01/S>2~|~FY2021 Urban Paving in the City of Beavercreek. This plan split is the 80% ODOT and 20% City items on the Urban Paving Portion of SR 835. 108934~|~1~|~2~|~02/S>2~|~FY2021 Urban Paving in the City of Beavercreek on SR 835. This plan split is the 100% City items on the Urban Paving Portion on SR 835. 124775~|~1~|~1~|~01/SAE~|~100% CEAO HSIP (4HB7) funded safety items 96957~|~1~|~1~|~01/STR/PIK~|~It is proposed to replace an entire structure on SR 772, 1.22 miles south of SR 32 in Pike Co. 93985~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn TR505, Comer School House Road, SLM 0.41, it is proposed to replace structure SFN 4033280.Credit Bridge applies: 95% Fed/5% local01/FNA/BR/Jackson 108654~|~1~|~1~|~01/NFP~|~The main facilities of the new Grand Republic Farm will be accessed off of US 6 by an 800? private drive. The main portion of that drive will be compacted stone with the apron at the highway being 9? reinforced concrete pavement 93110~|~1~|~1~|~01/STR~|~STP Rural Pavement: HUR-4-6.68-8.38 / ERI-4-0.00-7.95 93110~|~1~|~2~|~02/NHS~|~NHS Pavement: ERI-4-9.34-10.59 93110~|~1~|~3~|~03/S<2~|~STP < 200000 Pavement: ERI-4-7.95-9.34 93110~|~1~|~4~|~04/STR~|~STP Rural Bridge Work: SFN 2201259, SFN 2201291 93110~|~1~|~5~|~05/NHS~|~NHS Bridge Work: SFN 2201356 104849~|~1~|~1~|~01/SAF~|~Eliminate divided highway, reduce ramps to one lane, change ramp geometry at IR70/SR49 interchange. 104849~|~1~|~2~|~02/NHS~|~Widening of the bridge to allow for turn lane development. 104849~|~1~|~3~|~03/NHS~|~Replace culvert. 104849~|~1~|~4~|~04/NHS~|~Mill and Fill SR from Pleasant Plain Rd. to US 40 104849~|~1~|~5~|~05/NHS~|~On-going servioces 108684~|~1~|~1~|~01/SAF~|~Plans split for 100% safety funds 110382~|~1~|~1~|~01/NHS~|~Bridge Repair from a Bridge Hit. 106341~|~1~|~1~|~01/BRF~|~All costs to replace the bridge. Federal funds from the Ohio Bridge Partnership Program. Toll Revenue Credit is being used for the match 106341~|~1~|~2~|~02/NFP~|~Items paid 100% by the City of Van Wert. The 100% City items are resurfacing, curb replacement, and underdrains from Station 11+00 north to the intersection with Central Avenue. 95226~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip-seal treatment. Rural Federal Aid route, funded 80% Federal/20% State. 95226~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip-seal treatment. Funded 100% state. 100967~|~1~|~1~|~01/IMS~|~Overlay IR 675 in Montgomery County: MOT IR 675 SLM 4.11 to 7.44 100967~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 112620~|~1~|~1~|~01/MPO~|~Resurfacing of Center St from Lowellville Rd to Clingan Rd in the City of Struthers. 116179~|~1~|~1~|~01/BRO~|~Bridge rehabilitation (superstructure replacement) utilizing 80% 4C87/20% LNTP. 87974~|~1~|~1~|~01/SAF~|~Upgrade existing signing along SR 129 in Butler County from 16.29 to 25.86 logpoints. 106129~|~1~|~1~|~01/MPO~|~Conversion of the existing five legged intersection of Tylersville Road with Hamilton-Mason Road, Hancock Avenue, Grand Boulevard, and Tuley Road to a modern roundabout. 106129~|~1~|~2~|~02/MPO~|~Plan split for construction of pedestrian facilities in association with construction of the roundabout. 105998~|~1~|~1~|~01/NHS~|~Plan split for urban paving work 106625~|~1~|~1~|~01/NFP~|~Resurfacing of Nimisila parking lots part of the Summit MetroPark district. 94189~|~1~|~2~|~02/STR~|~Resurface and perform pavement repair on the RURAL portion of SR 133 in Clermont County between SLM 22.25 to 28.0 94189~|~1~|~1~|~01/S>2~|~Plan Split for the Urban section on CLE-133 between SLM 20.28-22.25 94189~|~1~|~3~|~03/NHS~|~Plan Split for minor bridge patching. 93340~|~1~|~3~|~03/S<2~|~A noise wall project at HEN US6 11.06-11.30 93340~|~1~|~1~|~01/NHS~|~A project to build a noisewall at HEN US6 11.32-11.83 93340~|~1~|~2~|~02/STR~|~A noise wall project at HEN US6 11.30-11.32 114941~|~1~|~1~|~01/IMS~|~Replace expansion joints. 114941~|~1~|~2~|~02/NHS~|~Replace expansion joints. 114941~|~1~|~3~|~03/STR~|~Replace expansion joints. 120794~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 105979~|~1~|~1~|~01/SAE~|~Plan Split 100255~|~1~|~1~|~01/MPO~|~Rehabilitate Elm Street using MPO STP funding. 105100~|~1~|~1~|~01/S<2~|~SCI 239 0.97 SFN 7304714 95941~|~1~|~1~|~01/NFA~|~Columbus Airport Authority 116334~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing on HAM-127 86272~|~1~|~1~|~01/NHS/AMH~|~Resurfacing80/20 Fed/City 86272~|~1~|~2~|~02/NHS/AMH~|~Resurfacing100% City of Amherst 105643~|~1~|~1~|~01/IMS~|~Longitudinal joints and minor repairs on Interstate Route. 116602~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items on FRA-71. 112333~|~1~|~1~|~01/NFP~|~Highway Lighting maintenance 124863~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties. 87114~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. NOB 565 0.00-2.88. Rural other federal aid funded 80 federal/20 state. 87114~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. MRG 669 5.62-11.92 and NOB 146 0.00-8.15. Not on any federal aid system. Funded 100% state. 104762~|~1~|~2~|~02/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. Urban paving on WAS 7 24.32-24.83, 24.83-24.98 SB ONLY, 25.15-25.19. Funded 80 Federal/20 Local. 104762~|~1~|~3~|~03/NHS~|~City of Marietta to pay for curb ramps. 100% Local. 104762~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. WAS 7 24.83-24.98 NB Only, 24.98-25.15, 25.19-31.59. NHS route funded 80 federal/20 state. 104762~|~1~|~4~|~04/NFP~|~Retroactive fuel price adjustment 102692~|~1~|~2~|~02/S>2~|~Improvements along SR 303 in the City of Hudson. 102692~|~1~|~1~|~01/MPO/HUDS~|~Improvements at the SR 91 and SR 303 intersection in the City of Hudson. 122818~|~1~|~1~|~01/STR~|~Plan Split for MVPO STBG funded scope. 84754~|~1~|~1~|~01/IMS~|~SFN 5003253 SR164 OVER MAH-IR680 14.37. 84754~|~1~|~2~|~02/IMS~|~Resurfacing of Interstate IR680 from US-224 to the Ohio Turnpike, Mahoning County, Ohio and includes right turn lane on Western Reserve Road. 84754~|~1~|~4~|~04/IMS~|~Pavement Markings. 84754~|~1~|~3~|~03/IMS~|~Bridge rehab of sfn#5007879, sfn#5007860, sfn#5007828. 115823~|~1~|~1~|~01/BRO~|~Split for bridge replacement work 121117~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing. 121512~|~1~|~1~|~01/BRO~|~MAD CR 71 4.14 over a Tributary of Deer Creek 110342~|~1~|~1~|~01/BRF~|~Bridge replacement plan split 121962~|~1~|~1~|~01/S50~|~All work to construct roundabout included in this split. 100% federally safety funded. 84769~|~1~|~1~|~01/S>2~|~The project will consist of reconstruction of State Street, including pavement removal and replacement, drainage improvements, access management per City ordinance, replacement and addition of sidewalks, and a bikeway. and a new traffic signal will be added at Campbell Road. 84769~|~1~|~2~|~02/S>2~|~For Indiana portion of the project. 84769~|~1~|~3~|~03/S>2~|~Plan split covers 100% local funded fence costs that are not eligible on this project. 123096~|~1~|~1~|~01/SAE~|~Median cable barrier 117227~|~1~|~1~|~01/MPO~|~Primary plan split for STBG eligible items. 117227~|~1~|~2~|~02/NFA~|~Locally funded scope 102397~|~1~|~1~|~01/NFA~|~Resurfacing project using an asphalt overlay treatment. MRG 555 3.85-15.22. Funded 100% state. 102397~|~1~|~2~|~02/NFP~|~Resurfacing of the Morgan County Full Service Maintenance Facility parking lot. Funded 100% State. 101182~|~1~|~1~|~01/STR~|~AC Overlay without repairs 101182~|~1~|~2~|~02/NFA~|~Asphalt overlay 93651~|~1~|~1~|~01/NHS~|~Work on the National Highway System (NHS). All work on US 224 and SR 12 is in this split. All work is in the City of Findlay. Federal funds from the District Preservation Program budget. The 20% non-federal match is provided by the City of Findlay. 93651~|~1~|~3~|~03/NFP/FIND~|~100% City items paid by the City of Findlay. Curb ramps, fill and partial depth repair and aux. pavement markings in the City of Findlay. 93651~|~1~|~2~|~02/S<2~|~All work on SR 37 and SR 568 is in this split. All work is in the City of Findlay. Federal STP funds from the District Preservation Program budget. The 20% non-federal match is provided by the City of Findlay. 97593~|~1~|~1~|~01/NHS~|~Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) Program with the amount over the GSM cap from the District Preservation Program budget. The GSM funds are to be used first. 94270~|~1~|~1~|~01/ENH/FRED~|~"01/ENH/OT/FRED" - Enhancement Funding 4B37 (80% Federal Cap $435,271) / LNTP (20% Local) Village of Fredericktown Enhancement project for construction bike/ped facility from Stockman Park to Dana Park. Project 98840~|~1~|~1~|~01/MPO~|~Replace SFN 5052254 Lowellville Road bridge over Hines Run. 119148~|~1~|~1~|~01/SAF~|~Plan split for CEAO HSIP eligible intersection realignment and improvements. 119725~|~1~|~1~|~01/BRO~|~Plan Split for Municipal Bridge Program funds. 97636~|~1~|~1~|~01/STR~|~Tree clearing and removal for Phase 1 of the Portsmouth Bypass. SCI SR 823 6.81 to 10.27 81821~|~1~|~2~|~02/NFP/fost~|~This is for the water works. 81821~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to reconstruct and widen WOO TR31 8.23-8.71 113099~|~1~|~1~|~01/NHS~|~Bridge Repair plan split 118785~|~1~|~1~|~01/NHS~|~Fine Graded Polymer Modified Asphalt Concrete Overlay (Smoothseal) 123885~|~1~|~1~|~01/STR~|~Plan split for deck replacement on STP Rural 108836~|~1~|~1~|~01/BRO~|~Rehabilitation of Bridge No. GRE COLUM 0020 (SFN: 2960370). 84654~|~1~|~2~|~02/NHS~|~See linked structures >20' span. 84654~|~2~|~3~|~03/IMS~|~Construction of noise wall along Blake Avenue in the IR-77 right of way. 84654~|~1~|~1~|~01/NHS~|~Resurfacing STA US 62 from 22.60 to 24.90. 84654~|~1~|~4~|~04/IMS~|~Repair and replace noise wall panels along IR 77 at 38th St and Orchard Park St. 84654~|~1~|~5~|~05/S>2~|~Minor bridge work to linked structures > 20' span. 84654~|~1~|~6~|~06/S<2~|~Minor bridge work to linked structures > 20' span. 97547~|~1~|~1~|~01/STR~|~Ohio Bridge Partnership Program 1 Bridge Replacement 120158~|~1~|~1~|~01/SAF~|~Plan Split for Safe Routes to School funding 101021~|~1~|~1~|~01/SAF~|~District wide highway lighting maintenance in D8. 101021~|~1~|~2~|~02/SAF~|~District wide highway lighting maintenance in D7. 101021~|~1~|~3~|~03/SAF~|~ITS Maintenance 86929~|~1~|~1~|~01/STR~|~SFN 7201079 SAN US6 30.26 Intersect: Little Pickerel Creek SFN 7202199 SAN SR53 1.69 Intersect: Wolf Creek 103700~|~1~|~1~|~01/SAF~|~Work eligible for SRTS funding 119850~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Cassady Ave 92220~|~1~|~1~|~01/IMS~|~100% state funded plan split for all work using state district allocation funds. 99894~|~1~|~1~|~01/MPO~|~Resurfacing of S Main Street from Knoll Street to Rose Lane Street 88513~|~1~|~1~|~01/NHS~|~Resurface SEN US224 29.58-32.14 102966~|~1~|~1~|~01/NFA~|~Smooth seal on Non-Federal Aid route: LOG SR 274 SLM 11.00 to 12.28. 102966~|~1~|~2~|~02/STR~|~Smooth seal on rural routes: LOG SR 245 SLM 5.12 to 5.84 & LOG SR 292 SLM 0.00 to 1.13. 118766~|~1~|~1~|~01/IMS~|~Microsurfacing 114367~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " 95163~|~1~|~1~|~01/STR~|~Field pave the existing 72" CMP on State Route 29. SHE 29 23.99. Field pave the existing 84" x 66" CMP on MER SR 274 3.24 119971~|~1~|~1~|~01/MPO/FRA~|~MVRPC STBG funded resurfacing project in the City of Franklin with a 31% local match. 87526~|~1~|~1~|~01/BRF~|~bridge replacement 90873~|~1~|~1~|~01/ENH~|~Install sidewalks, crosswalks, pavement markings, and advanced warning signing on State Route 501 on Liberty Avenue, Independence Drive, and Murray Road. on State Route 198 installation of crosswalks and advance warning signing. 91168~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on CHP US 68 from SLM 5.65 to 6.37 (segment length 0.720 total lane miles 1.440) Urban Paving Program. 106418~|~1~|~1~|~01/SAF~|~GR Upgrades 123631~|~1~|~1~|~01/STR~|~Funding Split for STP Rural 86692~|~1~|~1~|~01/STR~|~Smoothseal - RuralHUR-060-02.07 to 15.96 / ERI-060-00.00 to 08.09 86692~|~1~|~2~|~02/S<2~|~Smoothseal - UrbanizedERI-060-08.09 to 08.98 116930~|~1~|~1~|~01/IMS~|~Bridge Patching & substructure repairs - Interstate 116930~|~1~|~2~|~02/NHS~|~Patching & substructure repairs - NHS 116930~|~1~|~3~|~03/S5K~|~Patching & substructure repairs - Other Fed Aid 92121~|~1~|~1~|~01/S>2~|~80/20 funding split using federal MPO STP funds 92121~|~1~|~2~|~02/MPO~|~80% federal / 20% local funding split using MPO enhancement funds for enhancement eligible work items such as curb bump-outs, raised crosswalks, crosswalk signal head and curblane for storm water run-off. 88670~|~1~|~1~|~01/S<2~|~District Allocation 88670~|~1~|~3~|~03/S<2/WSTR~|~100% City of Wooster 88670~|~1~|~2~|~02/S<2/WSTR~|~Urban Paving - 80/20 - District Allocation/City of Wooster 84199~|~1~|~2~|~02/S<2~|~Maintenance contract for sign replacement, FY 2013. Other Federal Aid 80/20%. GAL 141 21.55-22.15, GAL 160 0.00-0.53 and GAL 588 10.87-11.74. 84199~|~1~|~1~|~01/NHS~|~Maintenance contract for sign replacement, FY 2013. NHS ATH 50 32.00-32.02 and GAL 7 21.21-26.06. Federal/State 80/20%. 120979~|~1~|~1~|~01/S>2~|~Sidewalk repacement. 120165~|~1~|~1~|~01/SAF~|~Construct a shared use path within the City of Lebanon along N Broadway St (SR-48) from the existing path near the fire station to Miller Rd (TR-101). 120165~|~1~|~2~|~02/NFP~|~Plan split for the watermain replacement, funded 100% locally. 120165~|~2~|~3~|~03/S>2~|~FY 25 Urban Paving project in the City of Lebanon on US 42, SR 48, and SR 123. 120165~|~2~|~4~|~04/S>2~|~full depth repair and urban paving items not covered by UP funds 120165~|~2~|~5~|~05/S>2~|~Full depth repair outside the city of Lebanon, 100% ODOT responsibility. 95724~|~1~|~1~|~01/STR~|~FUL-2 from SLM 2.85 to 4.86 and SLM 9.39 to 12.294 95724~|~1~|~2~|~02/S5K~|~FUL-2 from SLM 12.294 to 13.50 95724~|~1~|~4~|~04/S5K~|~Plan Split for 100% locally funded items within Urban Paving scope. FUL-2 from 13.506 to 14.133. 95724~|~1~|~3~|~03/S5K~|~Plan Split for eligible Urban Paving scope items. FUL-2 from 13.506 to 14.133. 115443~|~1~|~1~|~01/STR~|~Superstructure replacement. 117343~|~1~|~1~|~01/BRF~|~Bridge demolition. All work in this plan split. 98672~|~1~|~1~|~01/NFA~|~CR 171 2.75/4.20 Widen pavement, spot shoulder improvements, resurface, improve intersection radii. 1/4 mile south SR 119 (start)/0.2 mile north of Amsterdam Rd. (end). 115840~|~1~|~1~|~01/SAF~|~All work to construct the grade separation. 111514~|~1~|~1~|~01/NFP~|~Landscaping maintenance at various interchanges in Franklin County 87589~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1)Fai-SR 204-06.93 to 11.16; 2) Lic-SR 146-00.00 to 02.34; 3) Lic- SR 310-10.33 to 13.45; 4) Lic-SR 586-00.00 to 11.35; 5) Lic-US 40-19.61 to 29.38; 6) Lic-US 40-29.39 to 30.14; 7) Mus-SR 60-00.00 to 08.03; 8) Mus-SR 146-00.00 to 01.97; 9) Mus-SR 146-17.55 to 33.76; 10) Mus-SR 345-00.00 to 01.60; 11) Mus-SR 586-00.00 to 04.63; 12) Mus-US 40-00.00 to 01.08; 13) Mus-US 40-01.08 to 05.10; 14) Per-US 22-06.77 to 14.27; 15) Per-SR 345-00.48 to 09.22; 87589~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Fai-SR 204-00.36 to 06.93; 2) Mus-SR 146-16.21 to 17.55; 3) Mus SR 345-01.60 to 02.52; 4)Mus-US 40-05.10 to 09.59; 87589~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Cracksealing on Per-SR 383-00.00 to 01.50 87589~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Lic-SR 13-13.98 to 22.55; 2) Lic-SR 16-07.22 to 14.24; 3) Mus SR 16-06.41 to 11.70; 4)Mus-US 40-09.59 to 10.37; 123665~|~1~|~1~|~01/STR~|~Superstructure Replacement. 104615~|~1~|~1~|~01/S<2~|~Safety Improvement & Traffic Calming on SR 47 in The City of Sidney. 104615~|~1~|~2~|~02/S<2~|~Image enhancement on areas of SR 47 in the City of Sidney. 104615~|~1~|~3~|~03/SAF~|~Safety improvements. 96626~|~1~|~2~|~02/NHS~|~Culvert replacement project. GAL 35 0.95 and GAL 7 20.39. NHS route funded 80 federal/20 state. 96626~|~1~|~1~|~01/STR~|~Culvert replacement project. ATH 13 1.01; ATH 681 9.55; GAL 218 4.52; GAL 233 4.30; GAL 553 0.10, 0.58; HOC 56 11.93; MEG 124 64.23; MEG 248 2.64, 4.45; MEG 681 3.80; MEG 684 3.72; MRG 329 3.49; VIN 327 3.25, 7.52. Rural other federal aid funded 80 federal/20 state. 121696~|~1~|~1~|~01/SAF~|~Radar detectors. 98907~|~1~|~1~|~01/IMS~|~Remove and replace structures providing added capacity and construct MSE walls. CLA IR 70 11.01 - SFN 1204203 L - SFN 1204238 R CLA IR 70 13.26 - SFN 1204386 L - SFN 1204416 R 13.26 MSE wall 100802~|~1~|~1~|~01/STR~|~Replace structure 100802~|~1~|~2~|~02/STR~|~Replace bridge size culvert. 117237~|~1~|~1~|~01/SAF~|~Ped facility upgrades for safety at all intersections including pedestals, sidewalk, curb ramps, conduit, wiring and pullboxes 100341~|~1~|~1~|~01/STR~|~All work in this project. All funds are from the District Preservation Program budget. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. The federal funds are rural STP. 110050~|~1~|~1~|~01/NHS~|~NHS Plan Split: DEL-37-23.00-29.08 103951~|~1~|~1~|~01/IMS~|~Rehabilitate pump station ST 8 94085~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - District Facilities LBM7 (100% State) - No CAP - Demolition of properties and cleanup. 110449~|~1~|~1~|~01/SAF~|~Improvements at the intersection of US 23D (Third St) and US 33 (Mound St) 121359~|~1~|~1~|~01/SAF/ASD~|~install new guardrails on various county roads. 114400~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11. 124021~|~1~|~2~|~02/S50~|~Asphalt Concrete Overlay with Repairs RIC-314-1.759 to 3.018Asphalt Concrete Overlay with Repairs RIC-545-2.111 to 4.443 124021~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs RIC-314-0.00 to 1.759Asphalt Concrete Overlay with Repairs RIC-545-4.443 to 10.508 106328~|~1~|~1~|~01/SAF~|~Upgrading pavement marking and traffic signal hardware. 110390~|~1~|~1~|~01/STR~|~AC overlay without repairs on:MIA SR 202 SLM 5.06 to 11.24 110390~|~1~|~2~|~02/S>2~|~AC overlay without repairs on:MIA SR 202 SLM 11.24 to 11.62 124937~|~1~|~1~|~01/MPO~|~Repave Park Avenue from west side of Eaton Avenue to North B Street 101764~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7 (80 Federal)/4PS7 (20% State) - No CAP - Resurfacing and related work on PER SR 37 15.02 to 20.69. 84297~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 103898~|~1~|~1~|~01/BRF/NEWL~|~New Lexington Municipal Bridge Funds - 4R87 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Replacement of SFN 6460054, Pleasant Street Bridge in New Lexington. 85098~|~1~|~1~|~01/MPO/TOLE~|~resurface LUC CR501 6.24-7.09; Secor Rd. from Central Ave. to Monroe St. 115984~|~2~|~2~|~02/SAF/GAMB~|~Construction of shared use pathway along SR 308 115984~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 229/308 99023~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 102066~|~1~|~2~|~02/IMS~|~Damage due to car accident. 102066~|~1~|~1~|~01/IMS~|~Truck fire SFN 4806115 116389~|~1~|~1~|~01/NHS~|~JEF-7 and COL-7 93782~|~1~|~2~|~02/S<2/VAN~|~02/S<2/OT/VAN ; VAN-Van Wert W. Main St. Phase II, 100% Local Funds (4BG7). Funds provided by the City of Van Wert for water works construction. 93782~|~1~|~1~|~01/S<2~|~01/S<2/PV/ ; VAN-Van Wert W. Main St. Phase II, 80% Fed (4B97) - 20% Local (4BG7). 99207~|~1~|~1~|~01/S<2~|~This split is for all resurfacing work on CR 175 from SR 281 to CR 53. This split uses 80% Fed. (4B77) - 20% Local (LNTP). 99207~|~1~|~2~|~02/STR~|~This split is for all resurfacing work on CR 175 from CR 53 to the Henry County Line. This split uses 80% Fed. (4B77) - 20% Local (LNTP). 98017~|~1~|~1~|~01/NFP~|~Herbicidal Spraying contract for FY2020. Funded 100% state. 104708~|~1~|~1~|~01/SAF~|~improve the existing signal and add left-turn lanes on all approaches 93002~|~1~|~3~|~03/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - For work on CR 273B within the Limited Access Interchange of SR 16 that is the State Responsibility 93002~|~1~|~4~|~04/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - for joint seal repair work on 1) Mus-586-0311 over SR 16 93002~|~1~|~2~|~02/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - for deck patching and then overlaying 1) Mus-586-0265 93002~|~1~|~1~|~01/STR~|~District Preservation 7BPB (100% State) and then 4PF7(80% Federal) / 4PS7(20% State) - CAP on 7BPB funding - Resurfacing with related work on: 1) Lic-SR 586-00.00 to 11.35; 2) Lic-SR 146-00.19 to 02.34; 3) Lic-CR 723B-00.00 to 00.12; 4) Mus-SR 146-00.00 to 01.97; 5) Mus-SR 586-00.00 to 04.63; 96903~|~1~|~1~|~01/NFA/SCI~|~It is proposed to replace/rebuild guardrail at various locations on the local county roads in Scioto County. 100% Fed. 123773~|~1~|~1~|~01/BRO~|~Bridge Replacement 77438~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs ERI-2-15.892 to 20.023, ERI-6-16.011 to 16.164 92910~|~1~|~1~|~01/SAF~|~90/10 split between federal and local to construct safety-related widening of SR-252 between SR-17 and IR-480 WB to improve traffice flow. 106269~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-3D-0.00-0.34 FRA-23-10.51-10.72 107890~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 556 3.20-3.25. 101769~|~1~|~1~|~01/BRO~|~Plan split to program project. Update after scope is complete. 115981~|~1~|~1~|~01/BRO~|~Railroad grade separation 115981~|~1~|~2~|~02/S5K~|~ORDC Share of funding 95538~|~1~|~1~|~01/STR~|~Resurfacing SR 9 and SR 151 in HAS county including pavement repairs and pavement marking. 104406~|~1~|~1~|~01/IMS~|~Plan split for paving work in the interstate 91832~|~1~|~2~|~02/STR~|~STP Rural for pavement on on CLE SR 132 between SLM 12.51 to 12.53; and between SLM 13.38 to 14.24; and between SLM 16.55 to 17.95. 91832~|~1~|~1~|~01/S<2~|~STP Urban for pavement on on CLE SR 132 between SLM 10.8 to 12.51; and between SLM 12.53 to 13.38; and between SLM 14.24 to 16.19. 104114~|~1~|~1~|~01/NFP~|~plan split 90716~|~1~|~1~|~01/ENH~|~Project includes transportation enhancements to East Sharon Road including clay paver sidewalks, reconstruction of curbs and commercial drive aprons, ADA curb ramps, decorative signing and lighting, seating benches, bike racks, trash recepticles and other amenities. 95414~|~1~|~1~|~01/SAF/HIG~|~It is proposed, using 100% Fed Safety funds from CEAO, to upgrade existing pavement markings on various county routes in Jackson County in FY2018. 102687~|~1~|~1~|~01/SAF~|~shoulder widening, pavement markings, signage and paving. 102687~|~1~|~2~|~02/SAF~|~Plan split for Part B of project (waterline replacement) that is paid at 100% local funds. 90674~|~1~|~1~|~01/MPO~|~WOO CR9 8.53-8.54 - WOO SR65 23.04-23.05Improve the intersection of State Route 65 with Lime City Rd/Colony Rd. Lime City Road bike path. 118152~|~1~|~1~|~01/NHS~|~Landslide repairs. 114849~|~1~|~2~|~02/S5K~|~Plan split for SAN-101 from SLM 1.14 to 2.15 114849~|~1~|~3~|~03/NHS~|~Plan split for SAN-6 from SLM 13.77 - 13.89 114849~|~1~|~1~|~01/STR~|~Plan Split for SAN-101 from 0.00 to 1.14, SEN-101, WOO-582, and WIL-49 95399~|~1~|~1~|~01/SAF~|~Lower the approaches to the intersection of CR-15 (Gurneyville Rd) with CR-66/TR-193 (North Curry Rd) to improve sight distance at the intersection. Gurneyville Road to be lowered to improve sight distance issues away from the intersection as well. 108724~|~1~|~1~|~01/NFP~|~Install crosswalk at the SR 44 and NEOMED/Rootstown High School intersection. 102412~|~1~|~1~|~01/NHS~|~STA SR 43 from 25.00 to 27.20 STA SR 619 from 0.00 to 2.59 117400~|~1~|~1~|~01/MPO/LORD~|~Resurfacing. 117400~|~1~|~2~|~02/MPO/TRCE~|~Resurfacing. 100818~|~1~|~1~|~01/STR~|~Rehab bridges on PRE-121 108354~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 218 11.95 (SFN 2702827). Rural other federal aid funded 80 federal/20 state. 124735~|~1~|~1~|~01/SAE/STCE~|~Installing raised pavement markings. 124048~|~1~|~1~|~01/NFP~|~Plan split for crack sealing preventative maintenance on various route in District 12 87722~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 87722~|~1~|~2~|~02/IMS~|~Bridge Work 87722~|~1~|~3~|~03/IMS~|~Truck accident on I-71 that damaged the newly placed pavement in all three lanes. 91929~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. funds for Landscape Maintenance 94147~|~1~|~1~|~01/S<2/BUC~|~Mill and fill, pavement repairs; sidewalk, curb and gutter replacement; storm sewer installation on SR 98 (Plymouth Street) from SR 4 to north Bucyrus corp line (SLM 7.87 to 9.23). Includes District Allocation Funds to represent Urban Paving finacial contribution 94147~|~1~|~3~|~03/S<2~|~urban paving only section station 46+75 to 80+43. For local 80/20 split and state 80/20 with feds. 94147~|~1~|~2~|~02/S<2/BUC~|~100% City of Bucyrus responsibility - Water Lines, ect. 108272~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. DSR# HOL-003 81941~|~1~|~1~|~01/NHS~|~Bridge Replacement 102502~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Fast Dry pavement markings on District 5 Interstate Routes in FY 2022 93980~|~1~|~1~|~01/BRO~|~BR funding for all work on this project at an 80/20 fed/state split. 123076~|~1~|~1~|~01/NFA~|~Created for J&C involvement 113681~|~1~|~1~|~01/STR~|~Chip Seal RIC SR 98 00.00 to 04.05 94934~|~1~|~1~|~01/NFA~|~01/NFA/PV/ ; This split is for all resurfacing work on CR 12, CR180 and CR 698. This split uses 80% Fed. (4B77) - 20% Local (LNTP) 109970~|~1~|~1~|~01/SAF~|~District Wide contract to replace roadside delineators in FY2025. 101271~|~1~|~1~|~01/STR~|~Resurfacing SR 2 in Fulton County. 95454~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) Kno-13-0.00 to 8.16; 2) Kno-SR 13-08.22 to 08.42; 3) Kno-SR 13-08.50-09.00 95454~|~1~|~2~|~02/NHS/MTVN~|~District Preservation Urban Paving Program- 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Resurfacing in City of Mount Vernon on 1) Kno-SR 13-08.16 to 08.22; 2) Kno-SR 13-08.42 to 08.50; 3) Kno-SR 13-09.00-09.15 95454~|~1~|~3~|~03/S<2/MTVE~|~City of Mount Vernon Local Funding - 4BG7 (100% Local) - No CAP - Installation of Curb Ramps along SR 586 in the City. 90630~|~1~|~1~|~01/NFP~|~This is a barrier sweeping contract using maintenance operating funds. 108152~|~1~|~1~|~01/S<2~|~Urban Paving Plan split: PIC-22-17.34-18.26 PIC-188-0.00-0.22 117265~|~1~|~1~|~01/NFP~|~Split for work 95844~|~1~|~1~|~01/MPO~|~Reconstruction of US-422 from Laird Avenue to Ridge Avenue, in the City of Warren, Trumbull County, Ohio. 123762~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance funds 93770~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. MEG 124 14.62-16.67. Rural other federal aid funded 80 federal/20 state. 123384~|~1~|~1~|~01/NFP~|~Guardrail replacement and repair 123384~|~1~|~2~|~02/NFP~|~Guardrail replacement and repair 115514~|~1~|~1~|~01/SAF~|~Safety related funding up to Fed. max 106325~|~1~|~1~|~01/NHS~|~Construction of noise wall along State Route 11 in Austintown Township, Mahoning County, Ohio. 121032~|~1~|~1~|~01/NFP~|~In house chip seal CRA-19, CRA-100. Capital to Maintenance transfer for chip seal and pavement repair materials. 107935~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 26 22.01-22.05. Non-Federal Aid project. Funded 100% state ER funds. 120900~|~1~|~1~|~01/NFA~|~Pave access road to park district 94483~|~1~|~2~|~02/BRO~|~Column patching with anodes and fiber wrapped on SFN 5504260 MIA 571 1395 IR 75, SFN 1201549 CLA 41 1225 IR 70. Columns and abutment patching with anodes on SFN 7500602 SHE 47 1403. Column patching with anodes on SFN 5706092 MOT 70 1783 Bridgewater Rd. 94483~|~1~|~1~|~01/IMS~|~Column patching with anodes and fiber wrapped on SFN 0601896 AUG 75 0100 (Santa Fe New Knoxville RD.), SFN 0601950 AUG 75 0301 Pusheta Rd, SFN 0602310 AUG 75 0876 Hengstler Rd.,SFN 0602345 Buckland Holden Rd, SFN 5500184 and SFN 5500125 MIA 36 11.72 L&R IR 75, SFN 5709156 MOT 75 2292 Northwoods Blvd., SFN 1203541 CLA 70 0104 Osborne Rd., SFN 1204297 CLA 70 1151 Possum Rd., SFN 1204831 CLA 70 1886 Titus Rd, SFN 1205161 CLA 70 2329 Buena Vista Rd, and SFN 1205374 CLA 70 2739 Houston Pk. Column patching with no anodes on SFN 7502281 SHE 75 1207 Ft. Loramie Swanders Rd., SFN 1204084 CLA 70 0826 Dayton Springfield Rd., SFN 1204149 CLA 70 1024 Robert PK, Column patching with anodes on SFn 5501830 MIA 75 0440 CR 25A, SFN 5500753 MIA 41 1124 IR 75, SFN 5501350 & 5501385 MIA 55 0982 L&R IR 75, SFN 5709180 MOT 75 2356 Old Springfield Rd, SFN 5703425 MOT 40 1698 IR 75, SFn 5704448 MOT 49 1065 L Diamond Mill Rd., SFN 5705045 MOT 70 0662 Diamond Mill Rd., SFN 5705371 MOT 70 0859 Hoke Rd., SFn 5710804 MOT 675 0063 R SR 741; Tributary Holes Creek, and SFn 1204114 CLA 70 0970 Old Mill Rd. Abutment Patching with anodes (S.F.) SFN 7500602 SHE 47 1403 IR 75. Pier cap patching with annodes (S.F) SFN 5501830 MIA 75 0440 CR 25A, and SFN 5703425 MOT 40 1698 IR 75. Pier patching with anodes SFN 5710707 MOT 675-0055L, I75 (ramp V) and I75 Mainline. 101597~|~1~|~1~|~01/STR/JEF~|~DSR# JEF-011 101597~|~2~|~2~|~02/STR/JEF~|~DSR# JEF-012 76400~|~1~|~1~|~01/NHS~|~Resurface Frontage Roads and resurface mainline pvmt from DEL-23: 20.85-21.53 and MAR-23: 0.00-2.4201/NHS/PV/ 76400~|~1~|~2~|~02/NHS~|~Asphalt and concrete overlays of bridges:2100630 DEL US23 19.88 Intersect: Carter Ditch5100305 MAR US23 1.85 Intersect: Over Sr98-00115100364 MAR US23 1.85 Intersect: Over Sr98-00135100399 MAR US23 2.04 Intersect: Cauquaw Cr5100429 MAR US23 2.04 Intersect: Cauquaw Cr02/NHS/BR/ 111356~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads in Burr Oak State Park. Funded 100% State. 113032~|~1~|~4~|~04/STR~|~RURAL AREA - Outside city and urbanized area (DEF-18 from SLM 28.80 - 28.93) 113032~|~1~|~3~|~03/S5K/DEFI~|~INSIDE CITY - 100 percent city cost items (Items include ADA ramps and pavement repairs). 113032~|~1~|~1~|~01/S5K~|~OUTSIDE CITY BUT INSIDE URBAN AREA - Resurfacing on SR 281 in Defiance County. The work is inside of the Defiance Urban Area but outside of the City of Defiance. On the left side of the road from the beginning of the project until SR 281 leaves the City of Defiance on the right side at 0.45, then on both sides of the road until SR 281 enters the City of Defiance on the right side at 0.74, then on the left side of the road up to 1.35. District Preservation Program funds. No local funds. 113032~|~1~|~2~|~02/S5K/DEF~|~INSIDE CITY - 80/20 ITEMS - All resurfacing on SR 66 in the City of Defiance. Resurfacing on parts of SR 281 in the City of Defiance as follows. On the right side of the road from the beginning of the project until SR 281 leaves the City of Defiance on the right side at 0.45. On the right side of the road from where SR 281 enters the City of Defiance on the right side at 0.74 until SR 281 enters the City of Defiance on the left side at 1.35 then on both sides of the road until the end of the project at SR 18. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Defiance. 84660~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 82 from 22.74 to 29.87 and TRU SR 616 from 0.00 to 0.62. 84660~|~1~|~2~|~02/S>2~|~Resurfacing of TRU SR 82 "I" (connecting ramp between SR 82 and US 62) from 0.00 to 0.16. 84660~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span. 84660~|~1~|~4~|~04/NHS~|~Assigned work to the linked culverts. 107118~|~1~|~1~|~01/NHS~|~Micro surface DEL US 23 from 11.43 to 12.68 101203~|~1~|~1~|~01/NHS~|~Plant split 1 created for all NHS routes for the corresponding project: DE-L23-0.00-7.38 101203~|~2~|~2~|~02/STR~|~Pavement plan split 2 created for construction contract for the following STP Rural routes: DEL-42-0.00-5.45 115636~|~1~|~1~|~01/NHS~|~RRFB on LUC-2 115636~|~1~|~2~|~02/SAE~|~RRFB not on LUC-2 124324~|~1~|~1~|~01/NFP~|~Construction Engineering 109914~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded. 118144~|~1~|~1~|~01/NFP~|~Created for J&C involvement 106204~|~1~|~3~|~03/NFP/CANT~|~Lighting upgrades on STA US 30 within the City of Canton. 106204~|~1~|~2~|~02/NFP~|~Lighting improvements at the STA US 30/Raff/Whipple interchanges and STA SR 21 RCUT intersection with Butterbridge Rd. 106204~|~1~|~1~|~01/NFP~|~Lighting improvements at the SUM IR 271 Rest Areas. 106204~|~2~|~4~|~04/NFP~|~2 year lighting maintenance in POR, STA and SUM counties. 112749~|~1~|~1~|~01/S>2~|~Resurfacing. 112749~|~1~|~2~|~02/S>2/LOUI~|~Resurfacing, urban paving in the City of Louisville. 112749~|~1~|~4~|~04/STR~|~Resurfacing. 112749~|~1~|~5~|~05/S>2~|~Minor bridge work > 20' span. 112749~|~1~|~7~|~07/STR~|~Minor bridge work > 20' span. 112749~|~1~|~3~|~03/S5K~|~Resurfacing. 112749~|~1~|~6~|~06/S>2~|~Minor bridge work 10' to 20' span, lining a culvert. 112749~|~1~|~8~|~08/SAF/CANT~|~Construct westbound right turn lane to Kirby Ave, includes 3 culverts that are project eligible and are being replaced/extended under this turn lane. 97342~|~1~|~1~|~01/BRF~|~SFN 7460015 105571~|~1~|~1~|~01/NHS~|~Bridge Repair 93010~|~1~|~1~|~01/NHS~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacinging on 1) Cos-US 36-18.95 to 26.49; 93010~|~1~|~2~|~02/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Deck patching and Sealing along 1) Cos-US 36-18.95 to 26.49; 95790~|~1~|~2~|~02/STR~|~Resurfacing on SR 49 & SR 191 95790~|~1~|~1~|~01/NHS~|~Resurfacing on US 6 87605~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 113785~|~1~|~1~|~01/S<2~|~Railroad Pre-emption Interconnected signal pre-emption with SR 127(South Main Street)/Logan Street signal and at-grade crossing warning devices with RJ Corman Railroad. 121511~|~1~|~1~|~01/SAF~|~TSG & Lighting Maintenance 113703~|~1~|~3~|~03/STR~|~Culvert replacements. 113703~|~1~|~2~|~02/S5K~|~Culvert replacements. 113703~|~1~|~1~|~01/NHS~|~Culvert replacement. 113703~|~1~|~4~|~04/S5K~|~Culvert replacement. 113703~|~1~|~5~|~05/STR~|~Culvert replacements. 99577~|~1~|~1~|~01/SAF~|~Intersection improvement at Reeves and North Road, includes new left turn lanes, new signal phases and timing, new signal back plates, widen existing lanes to current design standards, resurface intersection and new pavement markings. 105811~|~1~|~1~|~01/IMS~|~Interstate bridge painting work 105811~|~1~|~2~|~02/NHS~|~NHS bridge painting 105811~|~1~|~3~|~03/S>2~|~Urban STP bridge painting 105811~|~1~|~4~|~04/STR~|~split for Rural STP painting 99414~|~1~|~2~|~02/ENH~|~Eastport Ave Improvements including paving, curb, sidewalk, storm sewer, etc; this plan split for NON-TAP eligible items. 99414~|~1~|~1~|~01/ENH~|~Eastport Ave Improvements including paving, curb, sidewalk, storm sewer, etc; this plan split for TAP eligible items. 116188~|~1~|~1~|~01/STR~|~Bridge Replacement 118646~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 108877~|~1~|~1~|~01/BRO~|~CEAO Local Bridge Funding - Federal 98468~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 124055~|~1~|~1~|~01/SAF~|~Intersection improvements along State St (MR 199), Water (MR 218) and Brown Street (MR 123M). 87138~|~1~|~1~|~01/STR~|~Resurfacing using rural STP funds. Funding from the District Preservation program. 80% 4PF7 and 20% 4PS7. 91904~|~1~|~1~|~01/IMS~|~Tentative split for interestate locations 104663~|~1~|~1~|~01/NFA~|~See linked structure. 118613~|~1~|~1~|~01/NFA~|~added plan split. 110889~|~1~|~1~|~01/NHS~|~Rehabilitate bridge carrying SR 7 over the conveyor belt access. 88032~|~1~|~1~|~01/ENH~|~Work eligible for federal-aid from two sources:1) OH-163 earmark 80% Federal w/TRC for the 20% Local match2) MPO enhancement funds with 80% federal / 20% Local participation rates 106387~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair project. DSR MRG-001, MRG CR 2A 0.32. Funded 80 federal/20 local. 117185~|~1~|~1~|~01/NHS~|~Split for pavement work on the NHS 118883~|~1~|~1~|~01/BRO~|~Plan Split for Local Bridge funding 105774~|~1~|~1~|~01/IMS~|~Added split 1 for painting work in the interstate 107281~|~1~|~1~|~01/STR~|~Overlay 107281~|~1~|~2~|~02/STR~|~Bridge preventative maintenance. 96605~|~1~|~2~|~02/ENH/DEF~|~This is for Transportation Alternatives funded work for the shared use path under the bridge and the lookouts. The City of Defiance has received funding approval from the Transportation Alternatives program. The funding approval as given in a September 7, 2016 letter from Jeff Shaner of the ODOT Office of Local Programs. Funding is 95% federal funds using Toll Credit with the non-federal match provided by the City of Defiance. After all federal funds are used the City of Defiance will provide all funds. 96605~|~1~|~3~|~03/NFP/DEF~|~Items funded 100% by the City of Defiance. Costs are for esthetic enhancements on the bridge. 96605~|~1~|~1~|~01/BRO~|~Work to replace the bridge including the lighting and rail. Esthetic enhancements are in another split. Funds from the District Preservation Program budget. One event has federal funds SAC 4PF7 and state funds SAC 4PS7. The other event has state bond funds SAC 7BPB. The SAC 7BPB bond funds shall be used first. There are no local funds in this split. 96605~|~1~|~4~|~04/NFP~|~Installation of a 2? conduit and appropriate pull boxes. Funds for the work to be provided by QualStar Communications, Inc. 100478~|~1~|~1~|~01/NHS~|~Micro surfacing of COL-11 from SLM 15.99 to 22.70. 122963~|~1~|~1~|~01/STR~|~All resurfacing work included in this plan split. 107479~|~1~|~1~|~01/STR~|~AC Overlay with repairs 107479~|~1~|~2~|~02/S<2~|~AC overlay with repairs 104645~|~1~|~1~|~01/MPO~|~Resurfacing Rayen Ave from MLK Blvd to Watt St in the City of Youngstown, Mahoning County, Ohio. 92794~|~1~|~1~|~01/S<2/GRAN~|~"01/S<2/PV/GRAN" - Village of Granville project for the resurfacing and related work to Columbus Road frome Weaver Dr/SR 16 WB Off Ramp north and continueing on Cherrry Street to W Broadway St - LCATS funding cap of $216,662 97548~|~1~|~1~|~01/NFA~|~Ohio Bridge Partnership Program. Lovers Lane over the East Branch of the Huron River 119875~|~1~|~1~|~01/BRO~|~Plan split for bridge rehabilitation work. 90557~|~1~|~1~|~01/BRF~|~Plan split for all work on this project. 88217~|~1~|~1~|~01/ENH~|~Add sidewalks, curbs, landscaping, street lighting, bridge underpass lighting and other amenities on Wayn Avenue from Third Street on US 35. 123100~|~1~|~1~|~01/SAE~|~median cable barrier 106335~|~1~|~1~|~01/SAF~|~100% State Funds for replacement of a failed culvert (Emergency Type A Project). 101279~|~1~|~1~|~01/STR~|~STP rural pavement 101519~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay. GAL 7 10.12-19.34. Funded 80 federal/20 state. 93589~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding. Toll Credit is being used to bring the federal funding percentage to 100%. 118895~|~1~|~1~|~01/NFP~|~ITS Camera Additions 87707~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 118854~|~1~|~1~|~01/STR~|~plan split. 118854~|~1~|~2~|~02/S5K~|~added plan split. 97485~|~1~|~1~|~01/STR~|~Culvert replacements on CFN 500620180 MAH-62-5.01, CFN TBD MAH-14-4.83, CFN 505340210 MAH-534-4.05, CFN TBD MAH-534-6.05, CFN 505340250 MAH-534-6.11 103317~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-CR 238-0259 (SFN: 0930334) which carries Lanes Mill Road over Four Mile Creek. Roadway will be widened to improve safety for motorists. 119225~|~1~|~1~|~01/STR~|~Resurfacing. 119225~|~1~|~2~|~02/STR~|~Bridge preventative maintenance to multiple bridges. 112288~|~1~|~1~|~01/STR~|~Slip repair project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 117004~|~1~|~1~|~01/NHS~|~C.O. Major Rehab funds, pavement and bridge work included 117004~|~1~|~2~|~02/NHS~|~C.O. Major Rehab funds, bridge work included 117004~|~1~|~3~|~03/SAF~|~Safety work. Construct RCUT at SR 511, CR 30A and Fry Rd. Median closure and remove north leg at CR 2175. 94898~|~1~|~1~|~01/NHS~|~Culvert Replacement / Rehab Culvert Allocation 90456~|~1~|~1~|~01/MPO~|~Bikeway construction 108799~|~1~|~1~|~01/S>2~|~Improve drainage at several locations on DEL SR 315 91452~|~1~|~2~|~02/NFA~|~Resurfacing of the Tuppers Plains Outpost parking lot. Funded 100% state. 91452~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 7 0.00-1.34 and MEG 7 18.64-23.99. NHS route funded 80 federal/20 state. 96837~|~1~|~1~|~01/NFP~|~Expo Center 105395~|~1~|~1~|~01/IMS~|~Bridge deck replacement with repairs on Interstate bridge. 95270~|~1~|~1~|~01/SAF/SCI~|~It is proposed to replace the pavement markings on various county highways.100% HSIP funds 124462~|~1~|~1~|~01/NFP~|~Created for TID Involvement. 109776~|~1~|~1~|~01/S<2~|~Fine graded polymer AC overlay 93045~|~1~|~1~|~01/SAF~|~Guardrail upgrade project. Various routes and sections. 100% Federal. 116933~|~1~|~1~|~01/IMS~|~Patch abutments, encase piers, scour protection 116933~|~1~|~2~|~02/STR~|~Patch abutments, pier encasements, scour protection 110175~|~1~|~1~|~01/IMS~|~Slide repair of embankments. 121278~|~1~|~1~|~01/NFP~|~FY28 split. 121278~|~1~|~2~|~02/NFP~|~FY29 121278~|~1~|~3~|~03/NFP~|~DY30 plan split. 106984~|~1~|~1~|~01/ENH~|~Plan split 79400~|~1~|~3~|~03/NHS~|~Plan Split for the Change Order to work in the Sharon Road intersection paid at 100% ODOT. 79400~|~1~|~2~|~02/NHS~|~Urban Paving Project for the City of Springdale. Includes pavement planing and resurfacing in FY2013. On SR 4 from the Southern Corp (SLM 8.33) to south of Cameron (SLM 8.89). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 79400~|~1~|~1~|~01/NHS~|~Urban Paving Project for the City of Springdale. Includes pavement planing and resurfacing in FY2013. On SR 4 from the Southern Corp (SLM 8.33) to south of Cameron (SLM 8.89). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 123313~|~1~|~1~|~01/STR~|~Plan Split to program project, update at project scoping. 99678~|~1~|~1~|~01/NHS~|~Resurfacing work funded at 80% federal and 20% state 99427~|~1~|~1~|~01/NHS~|~Replace existing RR bridge over US 250 (HAS-250-0081, SFN 3401472) to increase vertical and horizontal clearance under bridge. 113998~|~1~|~1~|~01/SAF~|~Install new/upgrade existing guardrail on various county roads in Clinton County. 99706~|~1~|~1~|~01/STR~|~Split for resurfacing work funded at 80% federal and 20% state 99706~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. 99706~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 107412~|~1~|~1~|~01/STR~|~Resurfacing of CR140-0.00 (Waldo-Fulton Rd) 107412~|~1~|~2~|~02/STR~|~Replacement of SFN 5137241 & SFN 5137268 107412~|~1~|~3~|~03/STR~|~Placeholder plan split for culvert replacement work 104910~|~1~|~1~|~01/NFA~|~South Western School District school bus replacement.Thirteen 78 passenger buses at full project participation. 104910~|~1~|~2~|~02/NFA~|~South Western School District school bus replacement. Eight 84 passenger buses at limited project participation of $84,009 per vehicle. 102360~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project 99941~|~1~|~1~|~01/NFP~|~Construction of a new Full Service Maintenance Facility in Monroe County. Includes cold storage, salt storage and brine system. Funded 100% state. 93526~|~1~|~1~|~01/BRF~|~SFN 6232000 OTT-19-3.54 bridge replacement. 120289~|~1~|~1~|~01/NFP~|~Construction Inspection/Compaction Testing 97902~|~1~|~1~|~01/NFP~|~Resurface access drive to Don Scott field 102626~|~1~|~1~|~01/NFP~|~Raised Pavement Markers 111519~|~1~|~1~|~01/S>2~|~The addition of the southbound lane on Columbia will tie existing deceleration lanes along the frontage into the reconstructed Socialville-Fosters & Columbia Road intersection turn lane. 116588~|~1~|~1~|~01/STR~|~Rural plan split for chipsealing and associated items on UNI-37 & UNI-161. 86962~|~1~|~1~|~01/BRO~|~8600031 WIL SR2 1.23 Intersect: Lick Creek Branch 105606~|~1~|~1~|~01/IMS~|~Interstate plan split 101009~|~1~|~1~|~01/SAF~|~City wide safety improvements 117795~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 104808~|~1~|~1~|~01/SAF~|~Install LED stop signs on Oxford Germantown Rd. at the intersection with SR-177. 100374~|~1~|~1~|~01/STR~|~For work on SR 199. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. Rural STP. 100374~|~1~|~2~|~02/NHS~|~For work on US 23. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. NHS. 101854~|~1~|~1~|~01/STR~|~Project rehabs various bridges in the district by patching, rebuilding deck edges, water-proofing. 101854~|~1~|~2~|~02/NHS~|~Project rehabs various bridges in the district by patching, rebuilding deck edges, water-proofing. 110547~|~1~|~1~|~01/IMS~|~Noisewall funds plans split 108371~|~1~|~1~|~01/NFA~|~The TOWNSHIP will construct, or authorize construction of, improvements to US-27, Struble Rd. and Generation Dr. and associated intersections 105676~|~1~|~1~|~01/NHS~|~plan split for all roadway work on the NHS route 105676~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 109077~|~1~|~1~|~01/S>2~|~Operations and maintnance 117210~|~1~|~1~|~01/MPO/MIL~|~Plan split for OKI TA funded portion of eligible construction with a 50% local match. 96868~|~1~|~1~|~01/IMS~|~100% state for project eligible using Type II noise wall funds. 101836~|~1~|~1~|~01/NHS~|~MED-224-15.50-16.36 99153~|~1~|~1~|~01/NFA~|~J&C Funds for interstate improvement 77451~|~1~|~1~|~01/IMS~|~Resurfacing 119030~|~1~|~1~|~01/NFA~|~All work is included in this split. Funding is 100% state preservation. 99892~|~1~|~1~|~01/MPO~|~Resurfacing Portage Street from Wise Avenue to North Main Street. 83885~|~1~|~1~|~01/NFP~|~Split for CE costs 112993~|~1~|~1~|~01/NHS~|~JAC 35 18.92-21.40 112993~|~1~|~2~|~02/SAF~|~Recessed-Wet Reflective Pavement Markings. 112993~|~1~|~3~|~03/NHS~|~Bridge PM. 112993~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 123268~|~1~|~1~|~01/NFP~|~Pruning. 119063~|~1~|~1~|~01/MPO~|~Upgrade of equipment, devices, and operation at County maintained traffic signals 88667~|~1~|~2~|~02/S>2~|~100% local funding split 88667~|~1~|~1~|~01/S>2~|~Work items eligible for federal and state funding sources using the following:o 80/20 federal/state funding split using TRAC funds.o 80/20 state/local funding split for urban paving eligible work.o 50/50 federal/local funding split using MPO STP funds. 122411~|~1~|~1~|~01/S5K~|~Signal upgrades and pedestrian improvements 89056~|~1~|~1~|~01/NHS~|~I-75 at Linn St. overpass; Linn St. from 8th to Court; Gest St. from Freeman to US50. This project is Construction Contract (CC) OH-2 of the Brent Spence Bridge Project. The purpose of this project is to replace the Linn St. overpass with I-75 and to reconstruct Gest Street from Freeman Avenue to US 50. The reconstruction of Gest Street will eliminate the roadway connection from Gest St. to Linn St.; however, pedestrian access from Gest to Linn St. shall be replaced. 106993~|~1~|~1~|~01/STR~|~GSMP slide repair. 79009~|~1~|~1~|~01/SAF/PCE~|~Widen Prospect Street (CR-74) for construction of a NB left turn lane at Summit Road (CR-148). Install a traffic signal at Prospect Street and Summit Road intersection, Ravenna Township, Portage County, Ohio. 102997~|~1~|~1~|~01/NHS~|~AC Overlay 100052~|~1~|~1~|~01/BRO~|~Replace existing multispan boxbeam bridge (COL_517-0665, SFN 1505300) with new three-span continuous slab bridge. 102587~|~1~|~1~|~01/NHS~|~Work on SR 81 in Allen County from Eastown Road at 13.47 to Cable Road at 14.47. Work on the NHS. District Preservation Program funds. No local funds. 102587~|~1~|~2~|~02/S<2/FIND~|~80% Federal urban STP funds from the District Preservation Program budget with the 20% match provided by the City of Findlay. Work on SR 37 in Hancock County from Main Street at 0.67 to Blanchard Street at 1.14 and from Blanchard Street at 1.34 to Strong Avenue at 2.57. 117631~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction costs 118753~|~1~|~1~|~01/STR~|~added plan split. 111631~|~1~|~1~|~01/SAF~|~All the work to construct the roundabout. Funding for the Construction Contract subphase is 90% federal funds from the safety program SAC 4HJ7 with a 10% local match. After the safety program cap is reached funding will be 100% local funds provided by the City of Lima. The Construction Engineering subphase will be 100% local funds. 121122~|~1~|~1~|~01/S5K~|~added bridge plan split. 99048~|~1~|~1~|~01/STR~|~Apply herbicides along the roadside for weed control on 4 lanes in MIA/SHE/AUG/MER/DAR 103165~|~1~|~1~|~01/IMS~|~Added plan split for lighting upgrade 119152~|~1~|~1~|~01/STR~|~MEG-124-7.49-16.64 Resurfacing 119152~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 833 0.08-.33. Funded 80 Federal/20 State. 124704~|~1~|~1~|~01/S5K~|~All work included in this plan split. 90883~|~1~|~1~|~01/STR~|~District Allocation 105196~|~1~|~1~|~01/STR~|~Plan split for the resurfacing of SR 726 in Preble County 104939~|~1~|~1~|~01/ERD~|~Construction of multi-purpose trail connector using TIGER funds 124708~|~1~|~1~|~01/S5K~|~All reconstruction work included in this plan split. 107836~|~1~|~1~|~01/IMS~|~FRA-270-0.60 and 2.60 and all the bridges within the roadway segment. 115433~|~1~|~1~|~01/MPO~|~Multi-purpose trail, NOACA funded 113807~|~1~|~1~|~01/STR~|~Bridge Superstructure replacement. 121812~|~1~|~1~|~01/NHS~|~Work to upgrade the interchange of IR 270 and US 33. 109351~|~1~|~1~|~01/SAF~|~Install left-turn lanes in both directions on US-27 at New London Rd, Herman Rd, and in the SB direction on US-27 at Ross Millville Rd. Provide a TWLTL between Ross Millville Rd and New London Rd. 109351~|~1~|~2~|~02/NHS~|~Plan split for resurfacing SLM 2.25-2.92. 109351~|~1~|~3~|~03/NFP/SWRW~|~Plan split for 100% locally funded work being performed by SW Regional Water District in conjunction with this project. 109351~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 101004~|~1~|~1~|~01/STR~|~Major 2 Funding - 5MT7(80% Federal) / 4MT7(20% State) - See CAP Comments - Resurfacing on Mus-SR 60-00.00 to 08.11 101004~|~2~|~3~|~03/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Replacement of two box culverts located at MUS-60-0.30 and MUS-60-0.90. 101004~|~1~|~2~|~02/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Remove deck surface, perform repairs and resurface on two bridges located at MUS-60-03.20 and MUS-60-07.62. 101004~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 123673~|~1~|~1~|~01/SAE~|~Construct roundabout and intersection improvements. 101307~|~1~|~1~|~01/IMS~|~Bridge cleaning. 101307~|~1~|~2~|~02/NHS~|~Bridge cleaning. 101307~|~1~|~3~|~03/S<2~|~Bridge cleaning. 101307~|~1~|~4~|~04/STR~|~Bridge cleaning. 101307~|~1~|~5~|~05/S>2~|~Bridge cleaning. 92264~|~1~|~1~|~01/STR~|~Culvert Construction/Repair 111174~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Replacement of SFN 2302314 117433~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 103790~|~1~|~1~|~01/SAF~|~Install signs - Safety 78256~|~1~|~1~|~01/IMS~|~priority system minor rehab. on TUS-77-27.73 to 34.97; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking 78256~|~1~|~2~|~02/IMS~|~TWo bridges SFN 7903871 and SFN 7903901 decks to be patched. 88810~|~1~|~1~|~01/NHS~|~Resurfacing / Pavement Gnrl Sys 90943~|~1~|~1~|~01/S>2~|~The project entails the drainage system study adjacent to the intersection of State Route 73 and State Route 4 in Butler County. Once study is complete, construct a new flow control chamber to prevent water from Dick's Creek and the Great Miami River from backing up through the storm sewer into the area of Middletown protected by a levee. Construct the chamber and access drive on the inside edge of the loop ramp from S.R. 73 east to S.R. 4 north. 103753~|~1~|~1~|~01/SAF~|~Widen SR 747 in the City of Mason 103753~|~1~|~2~|~02/ENH~|~Plan split to cover the Transportation Alternative eligible improvements, including construction of sidewalk and a shared use path along SR-741. 103753~|~1~|~3~|~03/NFP~|~Plan split for non-project eligible utility upgrades being included by Greater Cincinnati Water Works. 99897~|~1~|~1~|~01/MPO~|~115 signal controller upgrades 119842~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT - 100% 4PS7 Funding 122133~|~1~|~1~|~01/SAF/FCEO~|~Safety funded reduction of Fisher Rd from 4 lanes to 3 lanes, adding buffered bike lanes and sidewalks along both sides. 124273~|~1~|~1~|~01/S5K~|~All work included in this plan split. 93450~|~1~|~4~|~04/NHS~|~Structural steel painting on SFN 5701953 MOT US 35 1594 L, SFN 5701945 MOT US 35 1594 N, SFN 5701988 MOT US 35 1594 R (not BR eligible), SFN 5702372 MOT US 35 1649 and SFN 5701554 MOT US 35 821. 93450~|~1~|~2~|~02/S>2~|~Structural steel painting on SFN 5710510 MOT SR 741 838 (BR eligible). 93450~|~1~|~5~|~05/S>2~|~Structural steel painting on SFN 5703409 MOT US 40 1442 93450~|~1~|~3~|~03/NHS~|~Structural steel painting on SFN 5701899 MOT US 35 1564 (BR eligible). 93450~|~1~|~1~|~01/IMS~|~Structural steel painting on SFN 5703425 MOT 75 2086 (not BR eligible). 94748~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/PAV/LANC" City of Lancaster resurfacing project utiilizing Large City Funds 94748~|~1~|~2~|~02/S<2/FCEO~|~"02/S<2/PV/FCEO" - Resurfacing of roadway outside of the Lancaster Corp limits that Fairfield County Responsible for local match thru agreement with Lancaster. 114939~|~1~|~1~|~01/S>2~|~Replace deficient box culvert. 101177~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CLA SR 54 SLM 10.75 to 11.75 111318~|~1~|~1~|~01/NFP~|~LOR TID Transportation Drive 120833~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation. 91556~|~1~|~1~|~01/STR~|~General system paving of US-42 from SR-61 to Richland County line and on SR-61 from US-42 to Mt. Gilead N Corp 95998~|~1~|~1~|~01/BRO~|~SFN 8601178 95998~|~1~|~3~|~03/SAF~|~Center Line Rumble Stripe Plan split - Wil-20A - 0.00 to 1.10 95998~|~1~|~2~|~02/STR~|~Roadway portion 20A slm 0.00-1.10 86633~|~1~|~1~|~01/CMQ~|~ Add bicycle and pedestrian facility to east side of Plainfield Road from Cooper Road to Glendale-Milford Road in Blue Ash including curb and shoulder; extend existing culverts as needed;construct retaining wall where required;adjust drainage catch basins and manholes as needed; utilitiey poles will not be relocated. 112610~|~1~|~1~|~01/ENH~|~Rehabilitation of the Cemetery Bridge over the Mahoning River in Newton Township. 98296~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10. Funded 80 federal/20 state. 98296~|~1~|~2~|~02/S5K~|~Extrusheet sign replacement project on WAS 60 3.40-4.79. Urban other federal aid funded 80 Federal/20 State. 116625~|~1~|~1~|~01/STR~|~WOO-25 from SLM 6.24 to 6.285 116625~|~1~|~2~|~02/S5K~|~WOO-25 from SLM 6.285 to 7.40 96257~|~1~|~1~|~01/NHS~|~Drainage Improvement HUR 224 Bullhead Road Area 92886~|~1~|~2~|~02/S<2~|~Urban Paving LOR-611D-0.00-0.44 - 80/20 Fed/City of Lorain 92886~|~1~|~3~|~03/NHS~|~NHS Pavement 100 % City of Lorain 92886~|~1~|~4~|~04/S<2~|~STP < 200000 Pavement 100% City of Lorain 92886~|~1~|~5~|~05/NHS~|~NHS Bridge Work: LOR-6.5.31, LOR-6-9.67, LOR-611D-0.09L 92886~|~1~|~1~|~01/NHS~|~Urban Paving LOR-6-3.37-12.36, LOR-57-26.82-27.31 - 80/20 Fed/City of Lorain 97504~|~1~|~1~|~01/BRO~|~Bridge deck replacement of the Ohio Bridge Partnership Program (OBPP). On the federal aid system. Functional Classification Collector. 105168~|~1~|~1~|~01/MPO~|~Construction of a 12'-14' foot shared-use path and parallel 6'-8' wide pedestrian path to extend the proposed Wasson Way Trail network from Tamarack Avenue to the west, across the existing RR bridge over IR-71, terminating near the intersection of Floral Avenue and Elsmere Avenue. 100872~|~1~|~1~|~01/NFP~|~District 10 two year mowing project for CY 2020-21 along Interstates and Interstate look-a-likes (4 LN). Funded 100% state. 94193~|~1~|~2~|~02/S>2~|~General system portion of project, SLM 31.65-33.70 94193~|~1~|~1~|~01/S>2~|~New Albany urban paving portion of project, SLM 27.49-31.65 106443~|~1~|~1~|~01/BRO~|~KYTC's Share of the Bridge Work. 106443~|~1~|~2~|~02/BRO~|~OH Share of the Bridge Work. 106443~|~1~|~3~|~03/NHS~|~12th Street Bridge 121598~|~1~|~1~|~01/MPO/BARB~|~New roundabout. 105897~|~1~|~1~|~01/NHS~|~Bridge split 116800~|~1~|~1~|~01/S5K~|~Split for STP urban section 116800~|~1~|~2~|~02/STR~|~Split 2 for resurfacing on the STP Rural section 97648~|~1~|~1~|~01/BRF~|~SFN 4863135 112494~|~1~|~1~|~01/STR~|~AC overlay with repairs 112494~|~1~|~2~|~02/NFA~|~Resurface with asphalt concrete 76975~|~1~|~1~|~01/NHS~|~BR Funds eligible Bridge Replacement 98522~|~1~|~1~|~01/BRO~|~District Preservation Program funds. 99576~|~1~|~1~|~01/SAE~|~Upgrading existing guardrail on various Richland County roads. 97682~|~1~|~2~|~02/NHS~|~Type B emergency for rail and deck repair to HAM-50-2064L structure (sfn 3103226). 97682~|~1~|~1~|~01/NHS~|~Type B emergency project for the rail and deck repair to structure HAM-50-2064L (sfn 3103226). 97769~|~1~|~1~|~01/IMS~|~SFN 1204653, CLA-70-1633, East Possum Road - SFN 1204920, CLA-70-2015, Platttsburg Road Remove existing LMC overlay and replace with SDC overlay using hydrodemolition. Rehabilitate/seal expansion joints and rehabilitate/patch abument backwalls. 111430~|~1~|~1~|~01/STR~|~Landslide repair. 124411~|~1~|~1~|~01/SAF~|~Intersection improvement 103506~|~1~|~1~|~01/NHS~|~plan split 100860~|~1~|~1~|~01/NHS~|~ADA 52 16.14-20.69 100860~|~1~|~2~|~02/STR~|~ADA 770 0.00-3.47 100860~|~1~|~3~|~03/NFA~|~ADA 770 3.47-10.52 100860~|~1~|~4~|~04/STR~|~Bridge plan split placeholder. 98646~|~1~|~1~|~01/NFP~|~Lighting contract. 108920~|~1~|~1~|~01/NFP~|~ASD-3-6.81 to 8.25WAY-3-0.00 to 8.67WAY-3-8.67 to 11.94 108920~|~1~|~2~|~02/NFP~|~Structure work on:WAY-3-9.12WAY-3-11.63 (L)WAY-3-11.63 (R) 91834~|~1~|~1~|~01/S<2~|~General System; minor rehab. on BEL-149-0.00 to 1.64 in the village of Bellaire; mill and fill, curb ramps, pavement marking 100527~|~1~|~1~|~01/NHS~|~Fix approach pavement to the ramp bridge over US 52 on US 62 0.17 (SFN 0801313). 25684~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Marking pavements after resurfacing of 1) Mus-IR 70-00.76 to 01.46; 2) Lic-IR 70-28.93 to 29.42; 3) Mus-IR 70-01.46 to 05.56; 4) Mus-CR 30-02.15 to 02.34 25684~|~1~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation Program 4PF7 (90% Federal) / 4PS7 (10% State) - Bridge Rehabilitation of: 1) SFN 6002315; Mus-IR 70-01.98L carrying IR 70 over Kent Run - Not BR Eligible for Rehabilitation: Length = 198'; SD/FO = (0); SDR = 90.3; DR = 7; 2) SFN 6002374; Mus-IR 70-01.98R carrying IR 70 over Kent Run - Not BR Eligible for Rehabilitation: Length = 198'; SD/FO = (0); SDR = 90.3; DR = 7; 3) SFN 6002404; Mus-IR 70-02.99L carrying IR 70 over CR 28 Hopewell Rd - Not BR Eligible for Rehabilitation: Length = 139'; SD/FO = (0); SDR = 90.3; DR = 7; 4) SFN 6002439; Mus-IR 70-02.99R carrying IR 70 over CR 28 Hopewell Rd - Not BR Eligible for Rehabilitation: Length = 120'; SD/FO = (0); SDR = 89.3; DR = 7; 25684~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing of 1) Mus-IR 70-00.76 to 01.46; 2) Lic-IR 70-28.93 to 29.42; 3) Mus-IR 70-01.46 to 05.56; 4) Mus-CR 30-02.15 to 02.34 98759~|~1~|~1~|~01/IMS~|~SFN 8703752 76828~|~1~|~1~|~01/IMS~|~90/10 fed/state fund split for all work using federal IM funds 99616~|~1~|~1~|~01/NHS~|~Replace culvert type bridge carrying SR 39 over Thompson Park Creek. 81627~|~1~|~1~|~01/NHS~|~NHR Rural Culvert work 81627~|~1~|~2~|~02/STR~|~Rural Culvert work 81627~|~1~|~3~|~03/STR~|~Rural Bridge >20' work. 81627~|~1~|~4~|~04/NHS~|~NHS Urban Culvert work. 81627~|~1~|~5~|~05/S>2~|~Urban culvert work. 81627~|~1~|~6~|~06/S>2~|~Urban Bridge 10' - 20' work 81627~|~1~|~7~|~07/NHS~|~NHs Urban bridge > 20' work. 81627~|~1~|~8~|~08/NHS~|~Local participation for the cleaning of the 24" pipe that is located 1,000' N of the intersection of Franklin Road. 111626~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4. 109907~|~1~|~1~|~01/NFP~|~All work in this project uses this split; 100% State funds from District Preservation Allocations. 88815~|~1~|~1~|~01/STR~|~Bridge Replacement 88348~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1808672; CUY-090-2410 and 1808702; CUY-090-2463. 88348~|~1~|~2~|~02/SAF~|~Split 2 for safety funding for speed enforcement 88348~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 94303~|~1~|~1~|~01/IMS~|~Storm sewer outfall and system to treat runoff 94303~|~1~|~2~|~02/IMS~|~Waterline and sanitary line for project 4A 94303~|~1~|~3~|~03/IMS~|~Delay costs attributable to AT&T 105225~|~1~|~1~|~01/IMS~|~Replace and widen concrete slab bridges on Interstate route. 21758~|~1~|~1~|~01/S<2~|~Rehabiltiate Bridge BUT-128-0856 over the Great Miami River by replacing the rigid overlay, repairing the concrete sidewalks, and replacing the expansion joints. Rehabiltiat Bridge BUT-128-0972 (Witt Way over SR 128) by replacing the asphalt wearing surface. 21758~|~1~|~2~|~02/NHS~|~For work performed on NHS bridge. 21758~|~2~|~3~|~03/NHS~|~This plan split is for the decorative fencing to be paid by the City of Hamilton. City of Hamilton agrees to pay for costs beyond that of standard ODOT vandal fence. 124807~|~1~|~1~|~01/NHS~|~Culvert replacement NHS 124807~|~1~|~2~|~02/STR~|~Culvert replacement STP Rural 124807~|~1~|~3~|~03/NFA~|~Culvert replacement Not on Federal Aid System 115810~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County CEAO Highway Safety Improvement Program Funding - 4HB7 (80% Federal) / LNTP (20% Local) - See CAP Comments - Conversion of Intersection to a mini-roundabout. 115810~|~2~|~2~|~02/SAF/OT~|~"02/SAF/OT/MCEO" - 90% Federal (4HJ7) and 10% State (4BC7) - roadside ditch improvements and signing/marking improvements. 101119~|~1~|~2~|~02/NFA~|~Smooth seal on Non-Federal routes: DAR SR 503 SLM 7.70 to 9.20 101119~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: DAR SR 503 SLM 0.00 to 7.70 & DAR SR 721 SLM 0.00 to 2.90. 84607~|~1~|~2~|~02/STR~|~Minor bridge work to US-6-1.89 (SFN#0400068) over Hoskins Creek, SR-534-12.06 (SFN#0406988) over Trumbull Creek. 84607~|~1~|~4~|~04/S<2~|~Bridge work on ATB-SR534-25.25 (SFN# 0407143) over Cowles Creek, in Geneva Township, Ashtabula County, Ohio. 84607~|~1~|~1~|~01/STR~|~Resurfacing of US-6 from SLM 0.00 to 0.08, US-6 from SLM 1.54 to 2.63, and SR-534 from SLM 7.77 to 13.50 in Hartsgrove and Trumbull Townships. 84607~|~1~|~5~|~05/S<2/Gene~|~Resurfacing of State Route 534 from SLM 22.22 to SLM 22.54 in the City of Geneva, Ashtabula County, Ohio. 84607~|~1~|~3~|~03/S<2~|~Resurfacing of State Route 534 from SLM 22.54 to 25.25, in Geneva Township, Ashtabula County, Ohio. 121589~|~1~|~1~|~01/STR~|~Resurfacing work for STP Rural 121589~|~1~|~2~|~02/S>2~|~Resurfacing work for STP >200,000 100634~|~1~|~1~|~01/STR~|~Chip sealing COL-172 from SR 9 to US 30. 119578~|~1~|~1~|~01/S5K~|~Purchase LED speed limit signs 95363~|~1~|~3~|~03/SAF~|~WOO-20 from SLM 2.70 to 2.79 95363~|~1~|~1~|~01/IMS~|~LUC-75-8.76 to 9.50 LUC-475-4.26 to 4.50 LUC-475-4.76 to 4.99 LUC-280-5.26 to 5.50 95363~|~1~|~2~|~02/NHS~|~LUC-184-9.76 to 9.99 WOO-20-2.79 to 3.00 112705~|~1~|~1~|~01/IMS~|~Culvert work at FRA-70-7.38 101985~|~1~|~1~|~01/NFP~|~Herbicidal spraying on various routes throughout District 4. 93949~|~1~|~1~|~01/NFA~|~Pavement Markings (B) District wide. 100% State 123336~|~1~|~1~|~01/SAF~|~Improve the intersection of SR-32 & Herold Rd. 122924~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 103899~|~1~|~1~|~01/SAE~|~Intersection improvement at SR 39 & Bluebell Drive to include new traffic signal hardware and restriping of the pavement markings. 121893~|~1~|~1~|~01/NFP~|~Building demolition 99839~|~1~|~1~|~01/CMQ~|~Intersection improvements at Bell's Lane and SR-32 and Old SR-74 at SR-32. Includes improvements to Bell's Lane and Old SR-74 to accommodate additional turn lanes and receiving lanes. Construction of sidewalk on the east side of Bell's Lane and the north side of Old SR-74. 117518~|~1~|~1~|~01/S5K~|~Bridge Renovation & Relocation 93106~|~1~|~1~|~01/S<2~|~City of Zanesville resufacing project utilizing STP funds 103714~|~1~|~1~|~01/SAF~|~Work items eligible for SRTS funding 118630~|~1~|~1~|~01/IMS~|~Resurfacing 118630~|~1~|~2~|~02/NHS~|~Resurfacing 118630~|~1~|~3~|~03/S5K~|~Resurfacing 118630~|~1~|~4~|~04/STR~|~Resurfacing 106858~|~1~|~1~|~01/ERD~|~Plan split for Ferry Funds 117762~|~1~|~1~|~01/IMS~|~Plan split for pavement - added capacity for the new 4th lane in each direction. 94119~|~1~|~1~|~01/NHS~|~Deck Sealing 106284~|~1~|~1~|~01/NFP~|~Pavement markings along various routes in Ashtabula, Mahoning and Trumbull Counties. 106284~|~1~|~2~|~02/SAF~|~Elongated pavement markings. 84382~|~1~|~3~|~03/S<2~|~STP 80/20 (Circleville):PIC-56-20.64 to 22.04 84382~|~1~|~1~|~01/STR~|~STP Rural locations 80/20:PIC-56-22.04 to 33.93PIC-138-0.00 to 9.13PIC-674-0.00 to 10.93FAI-674-0.00 to 0.40UNI-38-0.11 to 0.30UNI-161-0.63 to 6.12 / 6.31 to 12.16UNI-347-0.00 to 15.23 84382~|~1~|~2~|~02/IMS~|~IR Funds 90/10:FRA-71-25.60 to 28.73 91655~|~1~|~2~|~02/NFP~|~100% state split for fiber optic cable purchase. 91655~|~1~|~1~|~01/SAF~|~80% Federal HSIP w/ 20% Local matching funds 90793~|~1~|~1~|~01/MPO~|~Removal and reconstruction of the existing pavement, curb, walk, adding new street lighting and ADA compliant wheelchair ramps in Dayton from Keowee Street from Hillrose Avenue to Leo Street. 98626~|~1~|~1~|~01/NFA/KCEO~|~"01/NFA/BR/KCEO " ? County Engineer?s Association Organization (CEAO) Funding 4B87(80% Federal) / LNTP(20% Local) Eligible to use Credit Bridge (TRC) up to $68,625.00 ? CAP 4B87; $434,625.00-$44,697.00(PE) = $389,928.00 (CO); TRC; $68,625.00-$8,939.40(PE) = $59,685.60 (CO) - Replacement of SFN 4236823 KNO TR135 01.50 Intersect: Vance Creek; Not BR Eligible for Replacement: Length=34 SD/FO(0) SR=49.1 DSR=5 94396~|~1~|~2~|~02/STR~|~General System Resurfacing 94396~|~1~|~1~|~01/S<2~|~General System Resurfacing 92271~|~1~|~1~|~01/STR~|~ Resurfacing of Airborne Road (CR-89) with 2 inches of asphalt pavement from SR-134 to Progress Way. 87195~|~1~|~3~|~03/S<2~|~District Preservation Program budget. SACs 4PF7 and 4PS7. Urban STP. No local funds. Work inside the Kenton Urban Area but outside the City of Kenton. Work on the left side of US 68 from 7.52 to 8.78 and on the right side of US 68 from the Urban Area Boundary to the end of the project at 8.86. 7.10 used for Urban Area Boundary. 87195~|~1~|~1~|~01/STR~|~District Preservation Program budget. SAC 4PF7 and SAC 4PS7. Rural STP. No local funds. From the county line to the Kenton Urban Area. Used 7.10 which is CR 135 for the Urban Area Boundary. 87195~|~1~|~2~|~02/S<2/KENT~|~Federal funds from the District Preservation Program budget SAC 4PF7. The 20% match is provided by the City of Kenton. Work on the left side of US 68 from 7.10 to 7.52 and 8.77 to 8.86. Part of US 68 which is inside the City of Kenton was outside the Kenton Urban Area after the year 2000 Census. Splits were set up with this area in the Urban Area was added the Urban Area update process in 2012 and 2013. The functional classification maps, and other data, not yet updated to reflect the new Urban Area boundary. 118848~|~1~|~1~|~01/STR~|~Resurfacing US 36 from SLM 3.85 to SLM 13.88 118848~|~1~|~2~|~02/S5K~|~Resurfacing US 36 from SLM 13.88 to SLM 15.90 98736~|~1~|~1~|~01/NHS~|~Type C Emergency culvert project 78158~|~1~|~1~|~01/STR~|~Rural resurfacing of MRW-314: 19.97-25.9801/STR/PV/ 78158~|~1~|~2~|~02/STR~|~Minor bridge work (asphalt overlay, patching, sealing) on 3 structures:5903394 MRW SR314 20.63 Intersect: Wilcox Run5903424 MRW SR314 20.71 Intersect: Cedar Fork5903459 MRW SR314 25.8 Intersect: Clear Fork - deck overlay02/STR/BR/ (do not use BR funds at this time) 92985~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Kno-SR 205-00.26 to 06.94 92985~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Kno-SR 205-00.00 to 00.26; 2) Kno-SR 514-00.26 to 07.93; 93289~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - Rehabilitation on 3005887 GUE SR513 8.71 Intersect: Sr 513 Over I70; Not BR Eligible for Rehabilitation: Length=295 SD/FO(0) SR=71.1 DSR=5 95524~|~1~|~1~|~01/NHS~|~Remove and replace overlay, rebuild deck edge, clean out joints and reseal. Bridge # CLA-68-0738R, SFN 1202677 Ramp C over the Mad River. 123890~|~1~|~1~|~01/NFA~|~Install standard MGS guardrail on several county roads. 108091~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridges. 93865~|~1~|~1~|~01/NFP~|~Construction of Salt Dome facility at Ravenna outpost. 93865~|~1~|~2~|~02/NFP~|~D4 POR Ravenna Salt Construction Support Services 76809~|~1~|~1~|~01/IMS~|~Split for pavement rehabilitation 93930~|~1~|~1~|~01/NFP~|~D09 District Pavement Long Line Markings (B) 99547~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 123199~|~1~|~1~|~01/STR~|~Repair piers on structure MRW-529-2.46 over Big Run Creek 103878~|~1~|~1~|~01/STR~|~Culvert Replacement. 117989~|~1~|~1~|~01/BRF/MCEO~|~Bridge replacement of MUS TR 420A 0.05 (SFN 6040322) 88573~|~1~|~1~|~01/STR~|~Pavement planing and resurfacing with asphalt concrete on US 127 from SLM 16.69 to 22.24 SR 47, US 127 from SR 185 SLM 25.30 to the North Corporation Limit of North Star SLM 29.47 113580~|~1~|~1~|~01/IMS~|~Interstate bridge painting split 113580~|~1~|~2~|~02/NHS~|~NHS bridge painting 113580~|~1~|~3~|~03/STR~|~Rural STP bridge painting 117779~|~1~|~1~|~01/STR~|~Culvert replacement at two locations on CAR-164. 97736~|~1~|~1~|~01/NFP~|~Added plan split due to funding 115792~|~1~|~1~|~01/NHS~|~Widening Alum Creek Drive to 3 lanes in each direction (SR317 to Groveport Road) 115792~|~2~|~2~|~02/BRO~|~Major Rehab/Widening of Alum Creek Drive including replacement of bridges over Big Walnut Creek. 105692~|~1~|~1~|~01/STR~|~Herbicidal spraying along 2 lanes. 21085~|~1~|~1~|~01/BRO~|~BRIDGE REPLACEMENT PROJECT. GAL 7 1291 (SFN 2700301). 80% Federal and 20% State. 117972~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 550 14.30. Funded 80/20 GSM. 88337~|~1~|~1~|~01/BRF~|~Bridge replacement 95938~|~1~|~1~|~01/NFA~|~Austintown Local School District 101400~|~1~|~1~|~01/STR~|~STP Rural AC Overlay with RepairWAY-83-0.00 to 7.54 101400~|~1~|~2~|~02/S<2~|~STP < 200000 AC Overlay with RepairWAY-83-7.54 to 7.83WAY-83-7.83 to 8.09 (South Bound) 101400~|~1~|~3~|~03/STR~|~Specific Bridge Work in Work Locations:WAY-83-0.00 to 6.94 101400~|~1~|~4~|~04/S<2~|~City of Wooster - 80/20 Fed/City. SLM 7.83 to 8.09 Split CorpWAY-83-7.83 to 8.09 (North Bound) 101400~|~1~|~5~|~05/S<2~|~100% City of Wooster Cost. SLM 7.83 to 8.09 Split Corp.WAY-83-7.83 to 8.09 (North Bound) 97170~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 564 0.02, SFN 6104118. Not on the federal aid system funded 100% state. 88604~|~1~|~1~|~01/STR~|~Rehabilitate 656 bridge over Big Walnut Creek. SFN 2103966 - DEL 656-1.72Deck overlay on 521 over Alum Creek. SFN 2103516 - DEL-521-6.83 107389~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Task order for construction inspection - 60% Federal (4PF7)/40% State (4PS7) 94635~|~1~|~1~|~01/MPO/LaPA~|~Construct a new Access Road From CR1 to the Gusiness District. 97595~|~1~|~1~|~01/STR~|~01/STR/OT ; Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) program. 94584~|~1~|~2~|~02/NHS~|~Remove superstructure SFN 4600215 LOG US 33 6.410 (NP 798) 94584~|~1~|~1~|~01/S<2~|~Installation of guardrail along the south side of SR 368 and connect to existing guardrail. SR 365 from SLM 2.08 to SLM 2.13 100835~|~1~|~1~|~01/IMS~|~Bridge Maintenance in Interstate bridges. 100835~|~1~|~2~|~02/S>2~|~Bridge maintenance on large urban bridge. 100835~|~1~|~3~|~03/STR~|~Bridge maintenance on rural route bridge. 100835~|~1~|~4~|~04/NHS~|~Bridge maintenance on NHS route bridge. 100835~|~1~|~5~|~05/SAF~|~Upgrade outside barrier on HAM-50-2198N to 57" 108904~|~1~|~1~|~01/S<2~|~Sidewalk project within the City of Hillsboro 124295~|~1~|~1~|~01/BRO~|~Repair railing on bridge carrying SR 152 over Piney Fork Creek. 110132~|~1~|~1~|~01/STR~|~DEL47, MAD38, MAD665-3.29 to 3.35, MAR37, MAR95, MAR203, MRW19, MRW 314, UNI37 and UNI47 110132~|~1~|~2~|~02/S<2~|~MAD-665-2.47 to 3.29 110132~|~1~|~3~|~03/NFP~|~FAY-753 92464~|~1~|~1~|~01/IMS~|~8703248 WOO IR75 7.03 Intersect: Tr 55 Bays Road 8703272 WOO IR75 7.03 Intersect: Tr 55 Bays Road 8703302 WOO IR75 7.2 Intersect: Csx 8703337 WOO IR75 7.2 Intersect: Csx 112914~|~1~|~2~|~02/SAF~|~Pedestrian crossing improvements in the Village of Ashley. 112914~|~1~|~1~|~01/STR~|~Paving SR-229 in Delaware County 110905~|~1~|~1~|~01/NFA~|~Entering for TID involvement 106826~|~1~|~1~|~01/MPO~|~Intersection work for adding a left-turn lane that qualifies for federal-aid 98007~|~1~|~1~|~01/STR~|~Bridge Replacement 103237~|~1~|~1~|~01/NFA~|~TID is constructing the Innovation Way Widening Project including, but not limited to , roadwork improvements by removing existing curb and gutter, constructing additional northbound and southbound lanes to provide two 11' lanes in each direction, installing new cubs and gutters and resurfacing existing roadway pavement. 123576~|~1~|~1~|~01/IMS~|~resurfacing on a portion of HAM-71 105386~|~1~|~1~|~01/STR~|~Smooth seal on rural route: MER SR 118 SLM 0.00 to 3.91 113893~|~1~|~1~|~01/NFA~|~Created for J&C involvment 108099~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridges. 108099~|~1~|~2~|~02/S<2~|~Bridge rehab on small urban route bridge. 108099~|~1~|~3~|~03/IMS~|~Bridge rehab on interstate route bridges. 109903~|~1~|~2~|~02/NFP/ODOT~|~All work to pave at the ODOT Hancock County Garage. 109903~|~1~|~1~|~01/NFP/ODNR~|~All work in the project to resurface at the ODNR Findlay office. 113200~|~1~|~1~|~01/NFP~|~All work in this project. State funds from the Safety Program. After the Safety funds cap is reached funding will be state funds from the District Preservation Program budget. 107375~|~1~|~1~|~01/IMS~|~Major Rehab IR 75 SLM 6.86 to 9.57 107375~|~2~|~2~|~02/IMS~|~Bridge Repair - Major Rehab IR 75 SLM 6.86 to 9.57 107375~|~3~|~3~|~03/IMS~|~Paving / Mill and fill on the north end 107375~|~4~|~4~|~04/IMS~|~Barrier wall repair, lighting repair, & signs. 107375~|~1~|~5~|~05/IMS~|~For numerous accidents to permanent work items 114381~|~1~|~1~|~01/MPO~|~Improvements to the existing intersection of Liberty Way with Cox Road. 92829~|~1~|~1~|~01/IMS~|~Bridge decks, approach slabs and top of abutment backwalls being overlayed with micro-silica conrete, minimal to no approach work. Repair of cross frames, resetting of bearings, and shimming of loose bearings on SFN 5705843 MOT 70 1441, SFN 5705835 MOT 70 1439, and SFN 5705436 MOT 70 0962 (Union Road) 97602~|~1~|~2~|~02/NFP~|~Signal work that is 100% City participation 97602~|~1~|~1~|~01/MPO~|~Signal work that is eligible for CMAQ funding 118577~|~1~|~1~|~01/STR~|~Plan Split 01/STR/OT 102374~|~1~|~1~|~01/NHS~|~This project is to upgrade the traffic signs along US 22 in Harrison and Jefferson counties. 105468~|~1~|~1~|~01/STR~|~STP Rural Plan Split - FAY-729-4.56 to 4.87 105468~|~1~|~2~|~02/NFP~|~FAY-734 from 7.18 to 12.56 94013~|~1~|~3~|~03/S>2~|~Microsurfacing. 94013~|~1~|~1~|~01/IMS~|~Double microsurfacing. 94013~|~1~|~2~|~02/NHS~|~Single and double Microsurfacing. 94013~|~1~|~4~|~04/STR~|~Microsurfacing. 105907~|~1~|~1~|~01/NHS~|~Plan split for urban paving work 105907~|~1~|~2~|~02/NFP~|~Split 2 for non-federal work items. 93957~|~1~|~3~|~03/NFP~|~For all work items not eligible for Urban Pav. 93957~|~1~|~1~|~01/NHS~|~Urban Paving from SLM 0.38 to 0.91 93957~|~1~|~4~|~04/SAE~|~This split is for the safety project on SR-2 at SLM 15.24 and SLM 19.99. 93957~|~1~|~2~|~02/S>2~|~Urban Paving from 0.00 to 0.38 and then from 0.91 to 1.79. 95732~|~1~|~1~|~01/S>2~|~On Burt Street from Sheridan to Kenton. On Bechtle Avenue from North to IORY. On Lagonda to Columbia to Main. 105215~|~1~|~2~|~02/NHS~|~plan split for roadway work in the NHS portion:HAM-32: SLM 1.3-1.53HAM-125: SLM 1.53-1.87 105215~|~1~|~3~|~03/SAF~|~Install RRFB and crosswalk markings at SR-32 & Turpin Lake Pl. 105215~|~1~|~1~|~01/S>2~|~plan split for the roadway work in the large urban portion:HAM-32: SLM 1.79-4.58Also includes the ramps 105215~|~1~|~4~|~04/NHS~|~Plan Split for bridge work on HAM-125-0169 including patching and deck sealing. 105215~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustments 98789~|~1~|~1~|~01/SAF~|~Installation of a two-way left turn lane, modification to the vertical profile south of Moselle Drive, widening of the paved shoulder to 5 feet, and installation of lighting at all intersections between Princeton Road and Millikin Road on Liberty Fairfield Road (CR-113). 98789~|~1~|~2~|~02/SAF~|~Plan split for 100% local utility work being performed as part of this project. 91908~|~1~|~1~|~01/NHS~|~Crack sealing on US 33 89458~|~1~|~3~|~03/IMS~|~Total reconstruction of existing 4 lane portion of SFN 7709390 SUM IR 271 12.62 L and SFN 7709420 SUM IR 271 12.62 R over SR 82 and SFN 7709544 SUM IR 271 1413 R and SFN 7709455 SUM IR 271 1413 L over Norfold Souther RR and Ledge Road 89458~|~1~|~1~|~01/IMS~|~Total Reconstruction of existing 4 lane segment of SUM-IR 271 from 12.62 to 15.24. 89458~|~1~|~4~|~04/NHS~|~Total New Construction of the widening portion of SFN 7709390 SUM IR 271 12.62 L and SFN 7709420 SUM IR 271 12.62 R over SR 82 and SFN 7709544 SUM IR 271 1413 R and SFN 7709455 SUM IR 271 1413 L over Norfold Souther RR and Ledge Road 89458~|~1~|~2~|~02/NHS~|~Total New Construction of 2 lanes (widening portion) of SUM-IR 271 from 12.62 to 15.24. 104509~|~1~|~1~|~01/BRO~|~Work eligible for CEAO LBR funding. 85971~|~1~|~5~|~05/NHS~|~Installation Dilemma Zone detection and Stop Bar detection at US 22/SR 56 and US 22/US 23SB Off ramp intersections 85971~|~1~|~4~|~04/STR~|~Removal of Prepare to Stop When Flashing signs and installation of dilemma zone detection and stop bar detection at US 22/SR 104 intersection 85971~|~1~|~2~|~02/NHS~|~Federal/state resurfacing of PIC-22 (NHS)SLM 15.73-17.34 (Mill Rd to enter Circleville corp) 85971~|~1~|~1~|~01/STR~|~Federal/state resurfacing of PIC-22 in the rural area.SLM 14.36-15.73 (SR-104 to Mill Rd) 85971~|~1~|~3~|~03/NHS~|~Federal/state funding (non BR) for patching and sealing on 3 bridges:6500285 PIC US22 16.08 Intersect: Scioto River Overflow6500307 PIC US22 16.29 Intersect: Scioto River Overflow6500358 PIC US22 16.99 Intersect: Over Scioto River 121566~|~1~|~1~|~01/IMS~|~Interstate Plan Split 106304~|~1~|~1~|~01/NFP~|~Install raised pavement markers along various routes throughout District 4. 91561~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (HOL-62-0837, SFN 3801144) with a four-sided precast concrete box. 102402~|~1~|~1~|~01/NHS~|~Resurfacing US 30 102402~|~1~|~2~|~02/SAF~|~Centerline rumble stripe work 102402~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 116905~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG TR 231 0.927, SFN 5337542. 124785~|~1~|~1~|~01/IMS~|~Plan split generated for Conduit replacement. 108921~|~1~|~1~|~01/STR~|~Culvert replacement. 96805~|~1~|~1~|~01/NFA~|~It is proposed to replace culverts in Brush Creek State Park in Scioto County. 113887~|~1~|~1~|~01/STR~|~AC Overlay with Repairs. 113887~|~1~|~3~|~03/S5K~|~AC Overlay with Repairs / Smoothseal 113887~|~1~|~2~|~02/STR~|~Bridge rehabilitation work to be completed with overlay project 113887~|~1~|~4~|~04/NHS~|~Bridge rehabilitation on SFN 1701843 CRA-30-18.648 113887~|~1~|~5~|~05/S5K~|~Bridge rehabilitation on SFN 1703366 CRA-181-0.639 113887~|~1~|~6~|~06/SAF~|~Railing replacement SFN 1703633. 113887~|~1~|~7~|~07/NFP~|~Catch basin reconstruction. 100% Crestline. 122398~|~1~|~1~|~01/NFA~|~Plan split for resurfacing work at Dempsey Sandusky Bay Fishing Access 98796~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. GRE-TR 6-0229 (SFN: 2934744), the existing timber truss covered bridge that carries Ballard Road over Caesar Creek. 117488~|~1~|~1~|~01/NFA/SUCE~|~Superstructure replacement. 111375~|~1~|~1~|~01/SAF~|~All work in this project. 122058~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes. 102295~|~1~|~1~|~01/NHS~|~Emergency Bridge repair project. Repair steel beam from vehicle damage, on MEG 833 0489 L, SFN 5300894. Sell as Type C Emergency Contract. NHS route funded 100% state. 119531~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement. 109563~|~1~|~1~|~01/SAF~|~This is the district's systematic RPM replacement maintenance contract of prismatic reflectors that have lost reflectivity or are in need of replacement. 124265~|~1~|~1~|~01/NFA/PICK~|~Improvement of Pedestrian Facilities along East Street in the City of Pickerington. 119126~|~1~|~1~|~01/NHS~|~Resurfacing. 119126~|~1~|~2~|~02/STR~|~Resurfacing. 106705~|~1~|~1~|~01/STR~|~See linked culverts. 106705~|~1~|~2~|~02/NFP~|~Replacement of 72"x96" culvert in Pymatuning State Park. 91741~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project with pavement repairs. NOB SR 513 1.00-9.38 on Minor Collector/Non-Federal Aid route. 100% State funded. 91741~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project with pavement repairs. MOE SR 537 3.84-4.98 and NOB SR 513 9.46-12.45. Rural other federal aid funded 80 federal/20 state. 110424~|~1~|~1~|~01/SAE~|~Resurfacing and restriping of Liberty Fairfield Road to add a southbound right turn lane. Modification of the traffic signal at SR 4 and Liberty Fairfield. 122459~|~1~|~2~|~02/BRO~|~Second plan split for construction contract costs above the Project Cap for 4PR7 (PROTECT) Funds. 122459~|~1~|~1~|~01/BRO~|~PROTECT bridge carrying SR 39 over the Tuscarawas River. 83005~|~1~|~1~|~01/SAF~|~This project will utilitize federal funding from two different sources: 90/10 federal/local funding split using federal safety funds and 80/20 federal/local funding split using NOACA STP funds. 118516~|~1~|~1~|~01/SAF~|~ATH US 50 33.58 94448~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - CEAO LBR Funding 4B87(80% Federal) / LNTB(20% Local) - CAP of $437,950.00 @ 95% Federal using Credit Bridge with a CAP of $69,150.00 - Replacement of 4231112 KNO CR27 1.17 Intersect: Big Run; BR Eligible for Replacement: Length=29 SD/FO(1) SR=28.2 DSR=5 84703~|~1~|~2~|~02/STR~|~LAW SR141 8.43 - 16.37Brdg Rehab4402294 LAW SR141 8.71 Intersect: Dog Fork4402405 LAW SR141 11.71 Intersect: Deloss Creek4402472 LAW SR141 11.94 Intersect: Deloss Creek4402502 LAW SR141 12.57 Intersect: Deloss Creek4402529 LAW SR141 12.98 Intersect: Symmes Creek4402588 LAW SR141 16.18 Intersect: Long Creek80/20 Split02/STR/BR/State 84703~|~1~|~1~|~01/STR~|~Resurfacing of 2-Lane Highways. 4402308 LAW SR141 8.83 Intersect: Trib Of Dog Fork4402332 LAW SR141 9.21 Intersect: Trib Of Dog Fork4402367 LAW SR141 11.57 Intersect: Trib Of Deloss Creek4402545 LAW SR141 15.3 Intersect: Trib Of Brushy Branch80/20 split01/STR/PV/State 95779~|~1~|~1~|~01/STR~|~SEN-162 from SLM 0.00 to 9.51 95560~|~1~|~1~|~01/NFP~|~Repair Fiber Optic Cable. 85387~|~1~|~1~|~01/NHS~|~80/20 federal/local split for all Urban Paving eligible work. 85387~|~1~|~2~|~02/NFP~|~Proposed work that is not federal-aid eligible i.e. 100% local 102999~|~1~|~1~|~01/STR~|~AC overlay without repairs 102999~|~1~|~3~|~03/NHS~|~AC Overlay with repairs. 102999~|~1~|~2~|~02/S5K~|~AC overlay without repairs 102999~|~1~|~4~|~04/S5K~|~AC Overlay w/repair in the city of Bellefontaine 124935~|~1~|~1~|~01/MPO~|~Resurfacing of Neeb Road from Cleves-Warsaw Road to Muddy Creek Road 102700~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. GAL 7 19.34-25.76. NHS route funded 80 federal/20 state. 100938~|~1~|~1~|~01/NHS~|~NHS Minor Rehab 100938~|~1~|~2~|~02/NHS~|~Bridge work not determined. 92148~|~1~|~2~|~02/STR~|~Culvert repair on HOC-56-11.11. Rural other federal aid funded 80 federal/20 state. 92148~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC-56-11.30 (SFN 3701298), HOC-56-12.38 (SFN 3701328). Rural other federal aid funded 80 federal/20 state. 122347~|~1~|~1~|~01/MPO~|~Plan Split for TMACOG Carbon Reduction Program and CMAQ funding. 109805~|~1~|~1~|~01/STR~|~AC overlay with repairs 91881~|~1~|~2~|~02/S<2/COSH~|~"02/S<2/OT/COSH" - 100% Local Funding 4BG7- No CAP for Local Funding Funding - For ADA ramps and any other items requested by the City at 100% their costs. 91881~|~1~|~3~|~03/S<2/COSH~|~"03/S<2/OT/COSH" - District Preservation Marking Pavements 4PF7(80% Federal) / 4BG6(20% Local-OPWC) - CAP of $324,999.00 for total Ohio Public Works Commission (OPWC) Funding Then switch to 4BG7- Striping after Urban Paving resurfacing in the City of Coshocton Cos-SR 541-18.72-23.62 91881~|~1~|~1~|~01/S<2/COSH~|~"01/S<2/PV/COSH" - District Preservation (Urban Paving) 4PF7(80% Federal) / 4BG6(20% Local-OPWC) - CAP of $324,999.00 for total Ohio Public Works Commission (OPWC) Funding - Resurfacing in the City of Coshocton Cos-SR 541-18.72-23.62 89435~|~1~|~1~|~01/STR~|~Landslide repair using drilled shafts. GSM funds. Work length approximately 250 ft. WAS 7 53.00-53.05. 80% Federal/20% State. 110562~|~1~|~1~|~01/STR~|~Replace Bridge size culvert on SR 129 over a tributary of Lick Run 77572~|~1~|~1~|~01/STR~|~Federal/State funding for bridge replacementSFN 4904265, MAD-665-3.96 over Deer Creek01/STR/BR/ 116486~|~1~|~1~|~01/NFA~|~D09 PM FY2028. 124549~|~1~|~1~|~01/IMS~|~Sign and Truss Replacements 108750~|~1~|~1~|~01/SAF~|~Longitudinal pavement grooving at interchange ramp termini. The cost is for purchase contract equipment rental only. ODOT Richland County forces will perform all other related work. 114298~|~1~|~1~|~01/ENH~|~Pavement markings 102463~|~1~|~1~|~01/STR~|~Resurfacing HOL-39 102952~|~1~|~1~|~01/STR~|~STP Rural eligible. 84164~|~1~|~2~|~02/STR~|~Bridge painting project. WAS 83 0181 (SFN 8403635). 80% Federal and 20% State. 84164~|~1~|~1~|~01/NHS~|~Bridge painting project. WAS 7 0976 L & R (SFN 8400091, 8400121) and WAS 50 0946 L & R (SFN 8401470, 8401500). 80% Federal and 20% State. 103703~|~1~|~1~|~01/S<2~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items): CRA-SR19:SLM 00.99 to 02.86 (LT)SLM 01.19 to 02.86 (RT)SLM 02.95 to 04.20 (LT)SLM 02.95 to 04.16 (RT)CRA-SR97:SLM 00.71 to 00.83 (LT)SLM 00.71 to 01.08 (RT) 103703~|~1~|~2~|~02/S<2~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):CRA-SR19:SLM 00.99 to 02.86 (LT)SLM 01.19 to 02.86 (RT)SLM 02.95 to 04.20 (LT)SLM 02.95 to 04.16 (RT)CRA-SR97:SLM 00.71 to 00.83 (LT)SLM 00.71 to 01.08 (RT) 103703~|~1~|~3~|~03/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?):CRA-SR19:SLM 0.00 to 00.99 (LT)SLM 0.00 to 01.19 (RT)SLM 04.16 to 04.20 (RT)CRA-SR97:SLM 00.83 to 01.08 (LT) 103703~|~1~|~4~|~04/SAF~|~Funding for Rumble Stripes Outside of Galion. 105105~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of SR 129: SLM 0.00 to 8.50 105105~|~1~|~2~|~02/S>2~|~Resurfacing on the Urban portion of BUT-129: SLM 8.50 - 8.76 113393~|~1~|~1~|~01/MPO~|~Roadway mill and fill in the City of Englewood. 121989~|~1~|~1~|~01/S5K~|~Resurfacing and related roadwork in urbanized boundary. 111870~|~1~|~1~|~01/NFP~|~Remove and replace bridge. Realign with approach pavement work. 87010~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 260 3.75-12.13. Funded 100% state. 96543~|~1~|~1~|~01/STR~|~Resurfacing ATB US 6 from 5.75 to 20.61. 96543~|~1~|~2~|~02/STR~|~See linked structures. 96543~|~1~|~3~|~03/NHS~|~See linked structure. 96543~|~2~|~4~|~04/STR~|~See linked structure. 120696~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 37/SR 310 intersection. 117146~|~1~|~1~|~01/SAF~|~City-wide safety improvements at 7 pedestrian and/or bicyclist crossing locations. 96006~|~1~|~1~|~01/BRO~|~District Preservation Bridge Fund - 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge rehabilitation on COS-SR 93-5.41 SFN 1601830 Intersect: Over Bacon Run; BR Eligible: Length=114 SD/FO(1) SR=63.2 DSR=4 107075~|~1~|~1~|~01/NFA~|~JAC CR VAR PM. 108499~|~1~|~1~|~01/MPO~|~Resurfacing of Waterloo Rd from SR 619 to Barberton E. Corp Limit. 94231~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split. 94231~|~1~|~2~|~02/SAF~|~For pavement markings on the NHS on US 24 in Defiance County. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal. 117132~|~1~|~1~|~01/NHS~|~This plan split includes all work associated with the project 122454~|~1~|~1~|~01/SAF~|~Reconfigure East 5th Avenue from High Street to North 5th Street from a four-lane section to a three-lane section with a parking area. Improvements at the East 5th Avenue/Summit Street intersection. Resurfacing. 98822~|~1~|~1~|~01/NFA~|~TID is constructing the Oster Road Project including, but not limited to, roadwork improvements by improving story sewers and sidewalks, a new continuous three lane roadway on Oster Road, from Abbe Road west approximately 1200 feet 24073~|~1~|~2~|~02/NHS~|~Pavement and ramp work. 24073~|~1~|~1~|~01/NHS~|~Plan Split for SFN 5008662 MAH US 62 18.25 bridge over SR 289, Mahoning River and CSX and Norfolk Southern RR. 108914~|~1~|~1~|~01/ENH/SOME~|~Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - Sidewalks and Drainage on 1) Per-SR 13-27.71 to 28.00; 2) Per-SR 668-16.79 to 16.87; 3) Per-MR 291-00.00 to 00.76; Per-MR 296-00.18 to 00.33 104063~|~1~|~1~|~01/NFA~|~Landslide repair. 113926~|~1~|~1~|~01/BRO~|~Repair structure BEL-148-1135 (SFN 0704091) by replacing the backwalls, expansion joints and approach slabs. Railing will be retrofitted. Deck will be patched and sealed. Existing steel beams will be cleaned and painted. 120104~|~1~|~1~|~01/NFP~|~All work included in the split. 108374~|~1~|~1~|~01/MPO~|~Resurfacing Norton Ave in the City of Barberton. 83135~|~1~|~1~|~01/SAF~|~Raised pavement marker (RPM) contract for FY 2013. Various routes and sections in D-10. 100% state funded. 90881~|~1~|~1~|~01/NFA/AF~|~Building a parking lot and driveway to the ferry boat. 80/20 w/Augusta Ferry providing the 20% match. 88339~|~1~|~1~|~01/STR~|~Erosion correction 3/4 miles North of SR305 87206~|~1~|~1~|~01/STR~|~0100633 ADA SR41 0.96 Intersect: Buttermilk Run01/STR/BR/State 100680~|~1~|~2~|~02/S<2~|~General Rehab on JEF-646 from SLM 7.36 to 8.46 100680~|~1~|~1~|~01/NFA~|~Resurfacing JEF-646 from SLM 4.31 to 7.36, including asphalt overlay, pavement repairs and pavement markings. 96986~|~1~|~1~|~01/BRO~|~Plan split for bridge repair work. 124110~|~1~|~1~|~01/NFA~|~Created Plan Split for J&C Involvement 105489~|~1~|~1~|~01/STR~|~UNI 47 from 6.95 to 9.14 118640~|~1~|~1~|~01/STR~|~MEG 681 6.24 Landslide Repair Using Dump Rock 95195~|~1~|~1~|~01/BRF~|~"01/BRF/BR/ODNR" - ODNR 4BF7 (100% State) - No CAP - Bridge Rehabilition 3026175 122125~|~1~|~1~|~01/SAF~|~Brown Road corridor improvement from Frank Road north to the Stimmel Rd/Linnet Ave intersection including a mini roundabout at the Brown Rd/Hopkins Ave intersection. 107598~|~1~|~1~|~01/MPO~|~Federal funds for project. 96705~|~1~|~1~|~01/NFP~|~Pavement rehab within John Bryan State Park including 1.5 inch mill and fill, full depth pavement repair (in select areas), aggregate for berm improvements, and installation of pavement markings. 111163~|~1~|~1~|~01/NFP~|~Campground resurfacing 114030~|~1~|~1~|~01/NFA~|~Plan split for CEAO funding eligible construction and CE costs. 103281~|~1~|~1~|~01/NFA~|~The proposed project would improve SR 310 in Licking County to accommodate increased traffic from the newly constructed Amazon fulfillment center. The project limits are from the 1-70 interchange on the south to USR 40 at the northerly terminus and includes mainline widening, modification to the USR 40/SR 310 traffic signal and the addition of a new signal at SR 310 and Pike street intersection. 104643~|~1~|~1~|~01/MPO~|~Resurfacing Trumbull Ave from US 422 to Girard East Corp Limit, in the City of Girard. 99732~|~1~|~1~|~01/NFA~|~City is reconstructing Front Ave, West 11th Street and Old River Road. 91727~|~1~|~1~|~01/IMS~|~Split includes the rehabiltation of bridges, WAR-71-1736/8302340, WAR-71-1683/8302316, WAR-71-2179/8302529, WAR-71-1996/8302464 106988~|~1~|~1~|~01/S<2~|~GSMP rock fall repair. 87642~|~1~|~1~|~01/BRO/NEWA~|~Replacement of deficient bridge (SFN 4560108) on Cherry Valley Road Lic-CR 128-00.97 - BR Eligible - Length=140, SD/FO=1, SR=32.0, DSR=6. New bridge to be placed on new alignment. 87642~|~1~|~2~|~02/S<2/NEWA~|~Construction of new roadway alignments for Thornwood Crossing and realignment of existing roadways. 117122~|~1~|~2~|~02/MPO~|~Plan split for STBG-funded reconstruction 117122~|~1~|~1~|~01/MPO~|~Primary plan split for STBG-funded resurfacing 107124~|~1~|~1~|~01/NHS~|~Work funded with the GSM program. Amounts needed over the GSM cap to be provided from the District Preservation Program budget. 114260~|~1~|~1~|~01/BRF~|~Bridge replacement and realignment 80% Federal 4B87 and 20% Local LNTP. 114260~|~1~|~2~|~02/SAF~|~Roadway realignment 80% Federal 4HB7 and 20% Local LNTP. 114260~|~1~|~3~|~03/ENH~|~For pedestrian related elements of the bridge replacement and realignment of CR 62 (80% Federal TAP and 20% Federal Safety). 98472~|~1~|~3~|~03/SAF~|~Centerline Rumble Stripes on SR57 from 10.28 (Barrington Dr) to 11.61 (Edgewood Ct.). 98472~|~1~|~2~|~02/S<2~|~Bridge Maintenance for Structures LOR-57-11.75Conc patch(non-deck) (010)Exp jt repair/repl (048)Deck patching(conc) (049) 98472~|~1~|~1~|~01/S<2~|~Roadway work for urbanized area sectionLOR-57-4.96 to 7.99 (60-AC Overlay w/Rpr)LOR-57-10.18 to 12.93 (60-AC Overlay w/Rpr)Grafton Rd EB & WB accel ramp at US20 concrete work 120957~|~1~|~1~|~01/STR~|~District Wide conduit replacements. 120162~|~1~|~1~|~01/NHS~|~Culvert liner project. WAS 7 12.48, CFN 1880522. 117284~|~1~|~1~|~01/NFP~|~Application of markings along IR 70 in FAI and LIC counties. 95104~|~1~|~1~|~01/S>2~|~Resurfacing of Palmyra Road, including guardrail, signing, and pavement markings, in the Village of Lordstown, Trumbull County, Ohio. 113605~|~1~|~1~|~01/NFA~|~Rehabilitate structure CLE-232-0180 which carries SR 232 over a tributary of Colcaster Run by sliplining the conduit and replacing the inlet headwall. 98484~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 98067~|~1~|~1~|~01/IMS~|~100% State Cable Barrier Repairs 105681~|~1~|~1~|~01/STR~|~STP Rural. District Preservation Program. 107581~|~1~|~1~|~01/IMS~|~To upgrade the existing guide, regulatory, and warning signs along mainline and lead-in signing at the interchanges for IR 70 and IR 470. 107581~|~1~|~2~|~02/NHS~|~To upgrade the existing guide, regulatory, and warning signs along mainline and lead-in signing at the interchanges for TUS US 36 and BEL SR 7. 105295~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7 97956~|~1~|~1~|~01/S<2~|~Smooth seal SR 41 in Clark County SLM 12.05 to 14.86 97956~|~1~|~2~|~02/NHS~|~Smooth seal US 68 in Clark County SLM 5.76 to 12.39, 12.39 to 15.05. 87756~|~1~|~1~|~01/S>2~|~Replace Bridge SFN 7707177 SUM 91 0905 over Branch of Cuyahoga River 101757~|~1~|~1~|~01/IMS~|~REplace existing deck with new reinforced concrete deck on bridge BEL-70-2684 (SFN 0703095). 80137~|~1~|~1~|~01/NHS~|~Replace bridge superstructure (deck & beams) for Bridge COL-267-0530, SFN 1504894, and improve vertical clearance by raising bridge. Repair substructure units. The bridge carries SR 267 over US 30. 107109~|~1~|~1~|~01/IMS~|~Major rehab of MAD-70-8.62 to 15.57 107109~|~1~|~2~|~02/IMS~|~Concrete deck overlay on structures over Big Darby Creek 107109~|~1~|~3~|~03/SAF~|~Install three ITS cameras 107109~|~1~|~4~|~04/IMS~|~Repair damage caused by vehicle crashes 101432~|~1~|~1~|~01/NHS~|~NHS AC Overlay without Repairs 81708~|~1~|~1~|~01/IMS~|~Replace reinforced concrete deck with new deck on two bridges, BEL-70-2134 & BEL-70-2134N (SFN 0702870, 0702889). May need some minor repair to substructure and painting of steel. 87035~|~1~|~1~|~01/SAF~|~Project for systematic sign upgrades in villages and other missed areas that need upgrading in Preble County. 87035~|~1~|~2~|~02/IMS~|~Minor rehab to include painting of structural steel and repair/replace damaged railing. 91093~|~1~|~1~|~01/IMS~|~District Allocation - 90/10 91093~|~1~|~2~|~02/SAF~|~Wet Reflective and Grooving Long Line Pavement Markings (Items 807 and 850). 91093~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 114101~|~1~|~1~|~01/NFP~|~All work in this project. 91148~|~1~|~1~|~01/IMS~|~Minor pavement rehab, FRA-270: 0.60-2.60 94254~|~1~|~1~|~01/IMS~|~Resurfacing and pavement repair on a portion of I-675 in Greene County from the Montgomery Co. line to almost North Fairfield Road. GRE IR 675: SLM 0 to 9.48 94254~|~2~|~3~|~03/NHS~|~Replace catch basins along ramp on US 35 94254~|~1~|~2~|~02/IMS~|~Plan split includes all bridge maintenance work. 94254~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 109392~|~1~|~1~|~01/ENH~|~Bike Lane funding 109392~|~1~|~2~|~02/NFP~|~100% County Items 97495~|~1~|~1~|~01/BRO~|~Repair concrete elliptical pipe structure COL-45-2298 (SFN: 1502824) located at S.L.M. 23.72 by installing a spray applied structural liner. 120803~|~1~|~1~|~01/SAE~|~Single land roundabout on SR-48 at Lytle Five Points Rd 92377~|~1~|~1~|~01/NFA~|~Replace existing mix building with a 40' X 40' salt storage building at the Cassela Outpost located 0.25 mi. W of US 127 on SR 119. An asphalt pad will be constructed by ODOT. Replace the existing mix building with a 40' X 40' salt storage building at the Mercer Outpost located at the intersection of SR 707. An asphalt pad will be constructed by ODOT. 92377~|~1~|~2~|~02/NFA~|~Reference original encumbrance 580991. Replace existing mix bldg. with a salt storage bldg. at the Cassela Outpost and replace the existing mix bldg. with a salt storage bldg. at the Mercer Outpost. Asphalt pads will be constructed by ODOT at both sites. 24855~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds for this project. 119796~|~1~|~1~|~01/SAF~|~All work included in this split. 106830~|~1~|~1~|~01/NHS~|~Work at the DEL-23/Home Rd and FRA-161/3 intersections 106830~|~1~|~2~|~02/S>2~|~Work at the DEL-257 at Home Rd and DEL-750 at 257/Glick Rd intersections 113907~|~1~|~2~|~02/NFP~|~City funded water line work and any ineligible items, all 100% City. 113907~|~1~|~3~|~03/ENH~|~Includes all "enhancement" work that is funded through TAP funding. This includes work for all sidewalks and/or multi use trails as well as any work that is directly tied to construction of these features (such as grading or drainage work). 113907~|~1~|~1~|~01/S<2~|~Roadway Reconstruction with Curb and Gutter. Funding is 95% federal funds from the Small City program until the cap is reached then the funding will be 100% local funds provided by the City of Van Wert. 115825~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 120765~|~1~|~1~|~01/SAF~|~Pedestrian Improvements 100347~|~1~|~1~|~01/STR~|~Microsurface various routes in Mercer & Shelby County MER SR 119 12.89 - 17.02 MER SR 274 4.35 - 6.14 SHE SR 29 0.00 - 2.98 SHE SR 29 7.64 - 14.47 SHE SR 119 4.46 - 8.22 100347~|~1~|~2~|~02/S<2~|~Microsurface SHE SR 29 14.47 - 14.56 89158~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP = CEAO $817,190.00 Federal dollars with Credit Bridge CAP of $129,030.00 for 15% match - Replacement of 4538102 LIC TR232 0 Intersect: Panhandle Railroad; BR Eligible for Replacement: Length=90 SD/FO(1) SR=22.6 DSR=5 125017~|~1~|~1~|~01/NFA~|~ODNR project to resurface, crack seal & chip seal Lake Loramie State Park 96502~|~1~|~1~|~01/ENH~|~Construct a sidewalk along Jacksonville Road from the Sunday Creek Bridge to Trimble Elementary using Safe Routes to School funds. Upgrade school zone signs. Funded 100% federal. 108173~|~1~|~1~|~01/NFA~|~Resurfacing Wildwood Lane 109589~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) -No CAP - Replacement of guardrail along selected OFAH-Rural routes in District 5. 109589~|~1~|~2~|~02/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) -No CAP - Replacement of guardrail along selected OFAH-Urban routes in District 5. 109589~|~1~|~3~|~03/NFA~|~District Preservation Funding - 4PS7 (100% State) -No CAP - Replacement of guardrail along selected NOFAS-Rural routes in District 5. 109589~|~1~|~4~|~04/SAF~|~Safety Cable Barrier Funding - 4HJ7 (100% Federal) -See CAP Comments - Installation of guardrail along selected portions of FAI-US 33 114929~|~1~|~1~|~01/NHS~|~Resurfacing. 92862~|~1~|~1~|~01/STR~|~Plan split to cover ODOT funded seawall and related items 92862~|~1~|~2~|~02/STR/Marb~|~Plan split to cover culvert and related items paid as 100% Village of Marblehead 103274~|~1~|~1~|~01/NFP~|~Sign replacements on various 2 lane routes throughout ATB and TRU counties. 118830~|~1~|~1~|~01/SAF~|~MEG-County Route Various Pavement Markings -FY24 108252~|~1~|~1~|~01/IMS~|~Disaster Relief Funds - 4BY7 (Federal 100%) - See CAP Comments - Repair of the slope above the Interstate Gue IR 70-19.65 107862~|~1~|~1~|~01/STR~|~ADA 136 18.96 & BRO 62 26.50 turn lane addition. 107862~|~1~|~2~|~02/STR~|~ADA 136 (19.18-20.04) 107862~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 118156~|~1~|~1~|~01/SAF~|~NB off ramp improvements 118156~|~1~|~2~|~02/SAF~|~Replace traffic signals 118156~|~1~|~3~|~03/SAF~|~Add sidewalks and modify westbound right turn lane at Troy Town 107602~|~1~|~1~|~01/S>2~|~Resurfacing on BUT-747. Includes Bridge BUT-747-0237. 103800~|~1~|~1~|~01/NFA~|~The City is extending and improving Ambrose Dr. and Colleta's Way about 750 feet to provide access to the new Evanston Recycling Solutions Site. The new road will allow for a more efficient and safer access to the facility for employees and trucks. 115171~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr HUR US 20 01.23 TO 07.35 115171~|~1~|~2~|~02/NHS~|~Bridge Work to be Determined at a Later Date. 116781~|~1~|~1~|~01/STR~|~Lighting Maintenance 108346~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract at various locations 108346~|~1~|~2~|~02/SAF~|~GR work along SR-229 adjacent to the Delaware Wildlife Area 111507~|~1~|~1~|~01/NHS~|~Slide repair. 102335~|~1~|~1~|~01/STR~|~Multiple culvert replacement. 112147~|~1~|~1~|~01/S<2~|~LAW- City of Ironton- 3rd Street Reconstruction 112147~|~1~|~2~|~02/S<2~|~Water line replacement along 3rd Street. 121011~|~1~|~1~|~01/STR~|~Resurfacing. 119106~|~1~|~1~|~01/NHS~|~Resurfacing. 119106~|~1~|~3~|~03/SAF/MINE~|~Installing mid-block crosswalk with RRFBs in the Village of Minerva. 119106~|~1~|~2~|~02/S>2~|~Resurfacing. 119106~|~1~|~6~|~06/NHS~|~Bridge hit repairs. 119106~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance. 119106~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance. 119106~|~1~|~7~|~07/S>2~|~Bridge preventive maintenance. 119106~|~2~|~9~|~09/SAF~|~New signal at US30 & Raff Rd and new overhead sign assembly. 119106~|~1~|~8~|~08/IMS~|~Bridge hit repairs. 119200~|~1~|~1~|~01/STR~|~Rural plan split. 114528~|~1~|~1~|~01/NFA~|~Created for J&C involvement 108975~|~1~|~1~|~01/ENH~|~All work in this project. Funding is 95% federal TAP funds with the use of Toll Revenue Credit. After the TAP fund are used MPO-STP funds will be used at an 100% federal rate with the use of Toll Revenue Credit. The local match and funds needed after the cap is reached will be provided by the Village of Beaverdam. 116792~|~1~|~1~|~01/S>2~|~Resurfacing plan split 120295~|~1~|~1~|~01/SAE~|~Ramp work at IR 090 and West Blvd for median and splitter island work 118863~|~1~|~1~|~01/STR~|~SR 46 from East Palestine to SLM 4.09 118863~|~1~|~2~|~02/S5K~|~SR 46 from SLM 4.09 to SR 7 113793~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" - replacement of structure (FAI CR 55 3.32, SFN 2337258). 91922~|~1~|~1~|~01/NFA~|~D09 ODNR 3 ProjectsIn Shawnee State Forest it is proposed to repair/replace 43 culverts on Forest Road #1, 66 culverts on Forest Road #2, and 3 culverts on Forest Road #16. The work ranges from placing headwalls at the inlet, replacing some deteriorated corrugated metal pipes, and perhaps placing rock channel protection at the outlets of some of the pipes. Also, the project would require the application of a concrete facing on the abutments and wingwalls on the SCI-2SF-0034 structure and the replacement of the SCI-2SF-1054 structure with a concrete box ($168,000). On Scioto Trail, replace 40 culverts, full depth pavement repairs and 3.7 miles of chip & seal on Forest Roads #2,3, & 4 ($347,200.00). 01/NFA/OT/State 119550~|~1~|~1~|~01/S>2~|~Pedestrian Improvements 98663~|~1~|~1~|~01/IMS~|~Split for work on the interstates 98663~|~1~|~2~|~02/NHS~|~Split for work on the NHS route 117811~|~1~|~1~|~01/NFP/SCMP~|~Milling and resurfacing park driveway and parking lots. 87688~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 102995~|~1~|~1~|~01/STR~|~Bridge deck replacement for VIN 677 3.47 (SFN 8203393). Rural other federal aid funded 80 federal/20 state. 81254~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - District Preservation Culverts 4CW7(90% Federal) / 4CV7(10% State) - No CAP - Culvert lining of culvert under SFN 3001628 GUE IR70 13.34 Intersect: I-70 Under TR 55: 81254~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Culvert lining of 1) 3001598 GUE IR70 13.21 Intersect: I-70 Over Ditch: Not BR Eligible: Length=17 SD/FO(1) SR=52.9 DSR=" " 117466~|~1~|~1~|~01/BRF~|~Bridge replacement (SFN 4931165) 99628~|~1~|~1~|~01/STR~|~Split for all resurfacing work at 80% federal and 20% state. 99628~|~1~|~2~|~02/SAE~|~Safety Rumble Striping 113042~|~1~|~1~|~01/STR~|~All work included in this plan split. 113062~|~1~|~1~|~01/NHS~|~All work in this split. 104249~|~1~|~1~|~01/SAF~|~The city will install a signal at the intersection of Chevrolet Blvd and Gabriella Drive 123981~|~1~|~1~|~01/ERD~|~Plan split for construction of shared use path utilizing RAISE grants and MPO TA funding 88526~|~1~|~1~|~01/NFP~|~Add sidewalks for safe routes to school. Porter Ave. SRTS, Phase II 92497~|~1~|~1~|~01/BRF~|~4830768 LUC C0001 0.05 MI. N. OF SYLV-METIntersect: TENMILE CREEK 0001 113317~|~1~|~1~|~01/MPO~|~TLCI Implementation eligible work for the City of North Royalton. 121614~|~1~|~1~|~01/ENH~|~Plan Split for MPO Transportation Alternatives funded scope. 124743~|~1~|~1~|~01/STR~|~Bridge Replacement At HOC-374-2.12 (SFN:3703967) 96280~|~1~|~1~|~01/NFA~|~Willams County full serv maintenance facility. 110578~|~1~|~1~|~01/STR~|~Culvert repair throughout the district. 103776~|~1~|~1~|~01/NFA~|~Village of Aberdeen SRTS project. Shared Use Path. 97041~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 116689~|~1~|~1~|~01/NHS~|~NHS Plan Split 116689~|~1~|~2~|~02/S>2~|~STP > 200,000 Plan Split 116689~|~1~|~3~|~03/STR~|~STP Rural Plan Split 98712~|~1~|~1~|~01/NFA~|~Transp mitigation 98452~|~1~|~1~|~01/NHS~|~This plan split includes all construction work associated with resurfacing and restriping US-50 from State Line to Lawrenceburg road. 98452~|~1~|~2~|~02/NHS~|~Drainage improvements includes small culvert replacements for HAM-50-0001, HAM-50-0015, HAM-50-0021, HAM-50-0026, HAM-50-0032, HAM-50-0033. Replace or line HAM-50-0041. Evaluate and possibly replace HAM-50-0048. 82826~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a 2" asphalt overlay treatment. MOE 26 0.00-5.56 and MOE 565 0.00-4.10. Rural other federal aid funded 80 federal/20 state. 95344~|~1~|~2~|~02/STR~|~Bridge Replacement.ADA SR41 5.20 (SFN 0100870)From PID 83923 95344~|~1~|~1~|~01/STR~|~Culvert ReplacementO C 000 Other Federal-Aide Highway Major Collector RURAL ADA -SR -41 5.890 to 5.900 0.020 80/20 Split 118521~|~1~|~1~|~01/MPO/CIN~|~Road diet on Gilbert Avenue from Court Street to E. MLK Drive. Reducing number of vehicular lanes, adding bike lanes, constructing curb bump outs at intersections to shorten pedestrian crossing distances. 94600~|~1~|~2~|~02/NFP~|~Facilities fence at assorted outposts throughout the District. 94600~|~1~|~1~|~01/NFP~|~Repairing/maintaining right of way fence throughout six Counties. Two-year contract. 107161~|~1~|~1~|~01/SAF~|~Install left turn lanes on SR 48 at the intersection with Nutt Road/Hibberd Road. 109751~|~1~|~1~|~01/STR~|~Ac overlay without repairs 109751~|~1~|~2~|~02/SAF~|~Signal radar detection 124222~|~1~|~1~|~01/NHS~|~Plan split for NHS bridge. 102937~|~1~|~1~|~01/SAF~|~Plan Split for the rural locations 104914~|~1~|~1~|~01/NFA~|~Northwest Schools school bus replacement project 92330~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 78 25.00, SFN 5800811. Rural other federal aid funded 80 federal/20 state. 113927~|~1~|~1~|~01/S<2~|~Small City funded items 114351~|~1~|~1~|~01/BRO~|~Repair structure carrying SR 259 over the Tuscarawas River by removing the existing wearing surface and placing a new rigid overlay. Repair expansion joints and seal concrete surfaces. 122596~|~1~|~1~|~01/ERD~|~Correct a landslide that impacts River Road (US 50) between Southside Avenue and the Speedway property (2857 River Road). Repair is likely to consist of a drilled pier wall with a length of approximately 300 feet in length. 83938~|~1~|~1~|~01/STR~|~Resurface existing roadway along with other roadway related items on MER US 127 from SLM 8.89 to 11.33 (segment length 2.44 total lane miles 4.88). 83938~|~1~|~4~|~04/STR~|~SFN 5402557 MER 127 1132 seal structure with SRS. 83938~|~1~|~3~|~03/STR~|~Patch 4' wide strip at the bridge deck and approach joint with MS class concrete on SFN 5402492 MER 127 1013 and 5402522 MER 127 1060 83938~|~1~|~2~|~02/S<2~|~Resurfacing of the existing roadway along with other roadway related items on MER US 127 from SLM 12.32 to 12.58 (segment length 0.260 mile total lane miles 0.520) 112793~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span. 112793~|~1~|~1~|~01/NHS~|~Resurfacing. 112793~|~1~|~2~|~02/IMS~|~Minor bridge work. 112793~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' structure. 91930~|~1~|~1~|~01/S<2~|~SCI SR140 2.38 Intersections Improvement On SR140, begin project 2.38 miles north east of US52. It is proposed to improve the sight distance of two intersections along SR140, CR15 (Dixon Mill) & CR250 (Lang Solcum). Right-of-Way for this project is needed in 2014. The project will be scheduled for 2015.80/20 split01/S<2/OT/State 124354~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federal bridge on interstate system 99999~|~1~|~2~|~02/STR~|~Plan split for culvert work on GEA-87 and LAK-307 99999~|~1~|~1~|~01/NHS~|~Split for culvert work on CUY-252 109929~|~1~|~1~|~01/IMS~|~Split for slope stabilization work. 117128~|~1~|~1~|~01/S>2~|~All work associated with this project is included in this split. 102024~|~1~|~1~|~01/NHS~|~Installing new signals at SR-45 & Champion Ave (CR-200) and SR-45 & SR-305 84590~|~1~|~1~|~01/STR~|~Resurfacing of State Route 172 from SLM 20.19 to SLM 30.32, in Osnaburg and Paris Townships, Stark County, Ohio. 84590~|~1~|~2~|~02/STR~|~Deck overlay of two structures. SFN# 7605471, STA-SR172-26.82 over Hugle Run and SFN# 7605390, STA-SR172-25.53 over Black Run Creek. 84590~|~1~|~3~|~03/S>2~|~Resurfacing of State Route 172 from SLM 19.15 to SLM 20.19 in the Village of East Canton, Stark County, Ohio. 90582~|~1~|~1~|~01/BRF~|~Plan Split for SFN 6760007 Fred Fuller Park Bridge over the Cuyahoga River. 102597~|~1~|~1~|~01/STR~|~This project is to cover the federally mandated sign upgrades for rural curves on two lane roads. 110882~|~1~|~1~|~01/SAF~|~signal upgrade work eligible for federal-aid 110882~|~1~|~2~|~02/NFP~|~Plan split for non-federal aide eligible work for 100% local items of work. 97479~|~1~|~1~|~01/BRO~|~OH and Kentucky Share of the KYTC Carl Perkins Bridge Painting Project. 111379~|~1~|~1~|~01/NHS~|~All the work in this grade separation project. Federal funds from the safety program of the County Engineers Association of Ohio (CEAO). Non-federal funds will be provided by Hancock County and ODOT. 117802~|~1~|~1~|~01/NFP/NALB~|~Major Widening of Green Chapel Road from Clover Valley Road to Mink Street 97931~|~1~|~1~|~01/STR~|~Replace structure SFN 5001862 MAH-US 62-3.31 124390~|~1~|~1~|~01/STR/FRAZ~|~Improvement to pedestrian facilities. 90908~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds. 118877~|~1~|~1~|~01/NHS~|~added plan split. 116688~|~1~|~1~|~01/NHS~|~All work on NHS route US33. 116688~|~1~|~2~|~02/STR~|~For work in the rural areas outside of the NHS (work on SR 49 & SR 81) 116171~|~1~|~1~|~01/SAF~|~Pavement marking installation (various routes) utilizing CEAO HSIP (4HB7) funds at 100%. 122235~|~1~|~1~|~01/NFA~|~NEVI Round 2B Corridor Group 33-A 122235~|~1~|~2~|~02/NFA~|~NEVI Round 2B 33-A 122235~|~1~|~3~|~03/NFA~|~NEVI Round 2B-33-A 124645~|~1~|~1~|~01/IMS~|~Reconstruction and adding a 3rd lane. 117369~|~1~|~1~|~01/BRF~|~Added plan split. 103477~|~1~|~1~|~01/STR~|~Landslide repair. ATH 124 1.60. DSR ATH-009. 95321~|~1~|~1~|~01/S>2~|~Plan split for culvert work 87798~|~1~|~1~|~01/NHS~|~Rock Cut Slide repair 104706~|~1~|~1~|~01/NHS~|~Bridge repair project. HOC 33 00.60 (SFN 3700097). NHS route funded 80 federal/20 state. 117144~|~1~|~1~|~01/MPO~|~Plan split for TLCI eligible work for ADA mobility and accessibility. 107273~|~1~|~1~|~01/SAF~|~Intersection improvement. 104871~|~1~|~1~|~01/STR~|~Resurfacing on rural portion of route. 104871~|~1~|~2~|~02/S>2~|~Resurfacing on urban portion of route. 110809~|~1~|~1~|~01/NHS~|~Guardrail Upgrades. 93790~|~1~|~1~|~01/STR~|~Replace SFN 6602851Located 1.45 miles south of CR51 on SR335. It is proposed to replace the deficient structure. 80/20 split01/STP/BR/State 92212~|~1~|~1~|~01/NFA~|~On South Bass Island extend the west side of the dock facility at the Miller Boat Line Lime Kiln Terminal 102216~|~1~|~1~|~01/NFA~|~LAW CR 69 2.33 embankment repair. 124700~|~1~|~1~|~01/BRO~|~Bridge rehabilitation. 107560~|~1~|~1~|~01/S<2~|~Resurfacing: ASH-96-3.910 to 4.24 FED/ST 80/20 107560~|~1~|~2~|~02/S<2~|~Resurfacing ASD-96-4.24 to 5.45 FED/LOCAL 80/20 107560~|~1~|~3~|~03/S<2~|~Resurfacing ASD-96-4.24 to 5.45 LOCAL 100% 105175~|~1~|~1~|~01/MPO~|~Construction of a shared use path connecting the City of Mason trail system near the Mason Sports Park to the City of Lebanon's Countryside YMCA Trail (which has connectivity to the Little Miami Scenic Trail). 104083~|~1~|~1~|~01/BRO~|~Bridge replacement on Mock Road. township/county slm is 3.65 116160~|~1~|~1~|~01/STR~|~Culvert liner. NOB 78 12.57, SFN 6101267. 104799~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement 104799~|~1~|~3~|~03/IMS~|~Culvert repair work on structures FRA-71-10.40 (2507226) and FRA-71-12.34 (2507463) 104799~|~1~|~4~|~04/IMS~|~Bridge rehabilitation of existing bridges 104799~|~1~|~6~|~06/IMS~|~rehabilitee of existing bridges 104799~|~1~|~2~|~02/NHS~|~Additional lanes on IR 71 104799~|~1~|~5~|~05/NHS~|~Work to widen structures 104799~|~1~|~16~|~16/IMS~|~Repair of damage caused by vehicle accidents 104799~|~2~|~9~|~09/IMS~|~Replace existing width Ramp AReplace existing width ramp B from gore at B1 to Stringtown RdReplace ramps C, D, G, HRetaining wall along Ramp D 104799~|~2~|~12~|~12/IMS~|~Replace structure FRA-270-0014 104799~|~2~|~14~|~14/IMS~|~Minor work on Stringtown Rd structure over IR 71 104799~|~1~|~7~|~07/NHS~|~Widening of structures to provide an additional lane in each direction 104799~|~1~|~8~|~08/NHS~|~Project eligible utility costs - power pole relocation 104799~|~2~|~10~|~10/NHS~|~Widen Ramps A and B (at Stringtown Rd), noisewall along ramp A 104799~|~2~|~11~|~11/NHS~|~Construct new Ramps B, B1, B2 104799~|~2~|~13~|~13/NHS~|~Construct new structure FRA-71-1050A 104799~|~2~|~15~|~15/NHS~|~Noisewall along IR 71 south of Stringtown Rd 113067~|~1~|~1~|~01/NHS~|~Pavement patching on: GRE SR 444 SLM 0.00 to 3.31 116545~|~1~|~1~|~01/MPO/HAM~|~Development and implementation of a parking management system in the Banks intermodal center. 116545~|~1~|~2~|~02/NFP~|~Plan split for 100% local cost of items that were determined not to meet Buy America requirements. Allowed to remain in the project but required to be funded 100% locally per 4/24/25 letter to Director Boratyn from FHWA. 124857~|~1~|~1~|~01/NHS~|~Spray line culvert NHS 124857~|~1~|~2~|~02/STR~|~Culvert replacement STP Rural 108705~|~1~|~1~|~01/S<2~|~Roadway work. Federal funds from the Small City program with the local match provided by the City of Van Wert. After the cap is reached all funds will be provided by the City of Van Wert. 108705~|~1~|~2~|~02/NFP~|~Work for a section of sanitary that will be replaced as part of the project. This will be paid 100% by the City of Van Wert. 101751~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - Plan Split 1 for GUE-209-00.00 to 07.07, MUS-209-00.00 to 1.64 101751~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - Plan Split 2 for GUE-209-07.07 to 07.64 101751~|~1~|~3~|~03/S<2/CAMB~|~"03/S<2/PV/CAMB" - Plan split 3 for GUE-209-07.64 to 8.11 123676~|~1~|~1~|~01/S>2~|~Superstructure Replacement. 115573~|~1~|~1~|~01/NFP~|~Replacement of MED SR 0057 08.37 Culvert. 115573~|~1~|~2~|~02/NFP~|~Replacement of MED SR 0057 08.37 Culvert. Additional work. 91927~|~1~|~2~|~02/SAF~|~LAW SR243 17.83 - 17.95 Safety Portion of Project. ? Superelevation improvement? Widening to increase lane width and add shoulders? Installation of guardrailMake this stretch of road safer by improving the superelevation, adding graded shoulders, and installing guardrail to protect the hazards. With the proposed fix, the roadway would be upgraded to 10 ft. lanes and 6 ft. graded shoulders (4 ft. treated) to allow the guardrail to be installed. The superelevation would be improved to 0.04 ft/ft to meet a design speed of 35 mph. The superelevation transitions will also meet a design speed of 35 mph. With using these transitions and tying into the existing pavement, 50-70% of the superelevation at the PC will not be acquired. Since the first 150 ft. of the curve is in a 55 mph zone, we will need to obtain design exceptions for lane width, graded should width and superelevation (position, transition, and rate90% Fed Safety Funds/10% State Safety Funds02/SAF/OT/State 91927~|~1~|~1~|~01/STR~|~LAW SR243, 17.83 - 17.95 Culvert Repair/Replace On SR 243, project is at SLM 17.91, which is 0.25 mile south west of its interseciton with SR 7. It is proposed to replace the culvert. 80% Fed/20% State 01/MPO/OT/State 91927~|~1~|~3~|~03/STR~|~Plan split for unknown Utility cost. 91927~|~1~|~4~|~04/STR~|~Plan split for ER event DSR LAW-003. 112658~|~1~|~1~|~01/MPO/NILE~|~Resurfacing of Salt Springs Rd from West Niles Corp Limit to East Niles Corp Limit and resurfacing of East Federal St from SR 169 to SR 46. 105881~|~1~|~1~|~01/BRO~|~Plan split for CPP relocation from the structure 88726~|~1~|~1~|~01/SAE~|~Reconstruct various runs of guardrail throughout the District. DAR-SR-47 20.170 to 23.720 AUG-SR-67 14.880 to 18.940 MER-SR-49 5.040 to 13.9 111487~|~1~|~1~|~01/SAF~|~LAW 93 1.36 Roundabout & sidewalk 111487~|~1~|~2~|~02/NFP~|~Split for 100% local cost. 111487~|~1~|~3~|~03/STR~|~AEP delays plan split. 106814~|~1~|~1~|~01/STR~|~Bridge painting project. GAL 141 12.46 (SFN 2701685), GAL 233 1.66 (SFN 2703092) and GAL 233 0.16 (SFN 2703009). Rural other federal aid funded 80 federal/20 state. 106814~|~1~|~2~|~02/NHS~|~Bridge painting project. GAL 35 16.93 LT (SFN 2701324) and RT (SFN 2701359), VIN 32 5.44 LT (SFN 8202796) and RT (SFN 8202826). NHS route funded 80 federal/20 state. 93811~|~1~|~1~|~01/NFP~|~District wide pavement marking plan for long line FY 14 markings. 93811~|~1~|~2~|~02/STR~|~This funding split is for the pavement marking material associated with the research locations identified in the plan. 122517~|~1~|~1~|~01/NFP~|~ODNR plan split. 109702~|~1~|~1~|~01/NHS~|~resurfacing on CLE-32 99490~|~1~|~2~|~02/S<2/FCEO~|~Fairfield County Engineer's CEAO County Surface Transportation Program Funding - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comments - Fairfield County resurfacing project on OFAH-Urban segments: 1) Fai-CR 33A -0.25 to 02.96; 2) Fai-CR 33A - 7.95 to 10.92; 3) Fai-CR 33A - 10.92 to 11.17 99490~|~1~|~1~|~01/STR/FCEO~|~Fairfield County Engineer's CEAO County Surface Transportation Program Funding - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comments - Fairfield County resurfacing project on OFAH-Rural segments: Fai-CR 33A - 0.00 -0.25 112368~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 94680~|~1~|~1~|~01/NFA~|~Landslide repair project using GSM funds. MOE 26 22.22-22.29. Not on any federal aid system funded 100% state. 103945~|~1~|~1~|~01/NFA~|~The County is constructing road improvements, widening Haverhill Ohio Furnace Road between US 52 and Altivia's west entrance, approximately 4900 Linear feet, to three 12 ft lanes and striped as two lanes with one center turn lane. 105536~|~1~|~1~|~01/STR~|~Work on SR 15 in Defiance County from the Williams County line at 0.00 to the north corporation limits on the Village of Ney at 2.98 and from the south corporation limits of the Village of Ney at 4.98 to the west boundary of the Defiance Urban Area at TR 149 which is at 10.62. All funds are from the District Preservation Program budget. No local funds. 105536~|~1~|~2~|~02/S<2~|~Work on SR 15 in Defiance County from the west boundary of the Defiance Urban Area at TR 149 which is at 10.62 to the concrete pavement just north of US 24 at 13.15. Although this work is inside of the Defiance Urban Area, it is all outside of the City of Defiance. All funds are from the District Preservation Program budget. No local funds. 101331~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay with repair treatment. NOB 724 0.00-2.75. Not on any federal aid system funded 100% state. 114235~|~1~|~1~|~01/NHS~|~All the slide repair work is in this project is in this plan split. Federal and state funds from the GSM program. After the GSM cap is reached funds will come from the District Preservation Program budget. 121394~|~1~|~1~|~01/NFP~|~27 96601~|~1~|~2~|~02/S<2~|~Culvert replacement project. HOC 93 10.96 (CFN 370930405), HOC 93 11.29 (CFN 370935001) and HOC 278 5.56 (CFN 372780035). Urban other federal aid funded 80 federal/20 state. 96601~|~1~|~1~|~01/STR~|~Culvert replacement project. HOC 93 9.64 (CFN 370930360), HOC 374 0.46 (CFN 37374045), HOC 374 0.54 (CFN 37374050), HOC 374 2.36 (CFN 373740190), HOC 374 3.25 (CFN 373740260), HOC 374 3.34 (CFN 373740265), HOC 664 0.47 (CFN 376640047), HOC 664 0.53 (CFN 376640053), HOC 664 10.46 (CFN 376640350) and VIN 56 1.46 (CFN 820560011). Rural other federal aid funded 80 federal/20 state. 106804~|~1~|~1~|~01/STR~|~Culvert replacements. 96682~|~1~|~1~|~01/NFP~|~FY 2019 Pavement Preventive Maintenance on various Routes in POR, STA and SUM Counties. 99574~|~1~|~1~|~01/MPO~|~Resurfacing Bailey Road (CR-65) from Mahoning Avenue to Trumbull County line. 104746~|~1~|~1~|~01/NFP~|~Replacement of one traffic signal, one overhead flasher, upgrade of five intersections to replace heads and add tethers & back plates. 122443~|~1~|~1~|~01/STR~|~Realigning the existing culvert to match the existing channel and restore and strengthen the associated embankment. 98359~|~1~|~2~|~02/NHS~|~Lighting project at the Fly 10-01 Rest Area on MOE 7 1.50-1.75. Funded 100% State 4BR7. 98359~|~1~|~1~|~01/NHS~|~Lighting project on the Ravenswood Bridge. MEG US 33 28.49-29.10. Funded 80 federal/20 state. 122201~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-C 94341~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 5.34 107950~|~1~|~1~|~01/SAF~|~plan split 99204~|~1~|~1~|~01/SAF~|~PIK CR66 3.95-4.82 114850~|~1~|~1~|~01/S>2~|~US 62 roadway items 99197~|~1~|~1~|~01/SAF~|~Intersection improvement at HIG CR7 with SR73 99197~|~2~|~2~|~02/STR~|~Correct curve alignment on CR7 89162~|~1~|~1~|~01/BRF~|~"01/BRF/BR/GCEO" - County Engineer's Association Funding 4B*7(80% Federal) / LNTP(20% Local) - CAP = $901,600.00 Federal dollars - Replacement of 3030423 GUE CR347 0.94 Intersect: Wills Creek; BR Eligible for Replacement: Length=117 SD/FO(1) SR=26.0 DSR=4 95777~|~1~|~1~|~01/STR~|~from SLM 2.32 to SLM 11.06 95777~|~1~|~2~|~02/STR~|~Various bridges 119224~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing with STP rural area. 119224~|~1~|~2~|~02/S>2~|~All items of work associated with resurfacing of routes that are located within the Columbus Urban Area. 92584~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to widen Fort Meigs Rd WOO TR106 0-0.47 101242~|~1~|~1~|~01/NHS~|~Resurfacing US 6 21.04-25.44 (NHS Eligible) 101242~|~1~|~2~|~02/NHS~|~Bridge split 105791~|~1~|~1~|~01/BRO~|~Split for bridge work 106035~|~1~|~1~|~01/NHS~|~Bridge painting project. GAL 35 15.96 L (SFN 2701235) and R (SFN 2701294). NHS route funded 80 federal/20 state. 101212~|~1~|~1~|~01/SAF~|~Various corridor and intersection imprvements including a road diet and pedestrian beacons on Detroit and Main Street. 101212~|~1~|~2~|~02/NHS~|~To repair damage caused by contractor to newly completed signal work. 111024~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation 120720~|~1~|~1~|~01/S>2~|~tree trimming plan split. 25191~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI SR158 2.48-15.83; 2) LIC SR158 0-0.56; 3) LIC SR158 1.1-2.28 25191~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation-Pavement Marking 4MP7 (100% State) - No CAP - Pavement Markings on: 1) Fai-SR 158-02.48 to 15.83; 2) Lic-SR 158-00.00 to 00.56; 3) Lic-SR 158-01.10 to 02.28; 105752~|~1~|~1~|~01/NHS~|~Resurfacing and sidewalk connector in the City of Kettering. 100466~|~1~|~1~|~01/S<2~|~Realignment of the intersection, including curb, sidewalk, concrete base, asphalt pavement, storm sewer, street lighting, landscaping and street amenities. 118634~|~1~|~1~|~01/BRF~|~Complete bridge replacement utilizing Municipal Bridge Program Federal Funds at 95% (includes 15% TRC). 97346~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County Engineer Bridge Replacement over Muskingum River- CEAO funding project maximum of $5 million - SAC code 4B87 and Local Major Bridge (4HC7) funding of construction at $13,985,594.00 97864~|~1~|~1~|~01/MPO~|~Adding 5' bike lane on Springdale Road from Hudson Drive to Berkshire Road. 95117~|~1~|~1~|~01/BRO~|~Replace the bridge deck, covert the abutments to semi-integral, and paint the structural steel on SFN5706092 MOT 70 1783. 83342~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 94080~|~1~|~1~|~01/S<2~|~Widen SR 47 from the intersection of CR 32 east a distance of 750'. A signal will be installed on mast arms and upgrading the pavement and markings and signage will be included. 103538~|~1~|~1~|~01/NFA~|~The Village is constructing Road improvements to support the expansion of the Airstream facility, specifically replacing 1,070 feet of existing pavement 1 1/2 " to create a center turn lane on SR 274 at Airstream Drive, additionally a semi-actuated signal will be added with side street stop bar detection and mainline advanced detection. 101193~|~1~|~1~|~01/BRF~|~District Preservation Program funds. 119192~|~1~|~1~|~01/STR~|~Pavement Markings. 113512~|~1~|~1~|~01/NHS~|~2" mill and fill with asphalt concrete in the City of Greenville 101169~|~1~|~1~|~01/STR~|~Overlay US 36 in Miami County with asphalt concrete 101169~|~1~|~2~|~02/S>2~|~Resurfacing 118318~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at LOR-20-2.05/SR-511 105875~|~1~|~1~|~01/IMS~|~Rehab bridge size culvert on IR. 102372~|~1~|~1~|~01/NHS~|~Traffic sign upgrade along SR 7 in Belmont County. 106219~|~1~|~1~|~01/S>2~|~Minor widening and enhancements with curb, gutter, storm sewer and sidewalks on Factory Road in the City of Beavercreek. 111510~|~1~|~1~|~01/NFP~|~Electrical maintenance contract for work at various locations 120749~|~1~|~1~|~01/SAE~|~Single-lane roundabout. 94282~|~1~|~1~|~01/ENH~|~Construct sidewalk along County Route 163 (Chestnut Street) in the City of Ravenna, Portage County, Ohio. 115595~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 112418~|~1~|~1~|~01/IMS~|~AC Overlay with repairs. 76815~|~1~|~1~|~01/IMS~|~100% UNFU plan split 123834~|~1~|~1~|~01/NFP~|~Plan Split for bridge maintenance activities using 100% state funds 87228~|~1~|~1~|~01/STR~|~0102911 ADA SR125 1.33 Intersect: Spock Run 80 Fed/20 State. 01/STR/BR/State 93976~|~1~|~1~|~01/NFP~|~District Allocation - Stream Restoration Project 116203~|~1~|~1~|~01/IMS~|~Plan split to correct the failing shoulder on HAM-74 98843~|~1~|~1~|~01/NHS~|~Plugging 6 gas wells that were acquired with ATH 50 18.54 project in the 1990's. 110840~|~1~|~1~|~01/SAF~|~Construction of sidewalks on Country Club Road with 100% federal Safety funds (90% 4HJ7/10% TRC) 92471~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 93517~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - Safety Funded - CAP = $147,000.00 - Gue-IR 77-07.51 to 07.75 - Micro Surfacing; Gue-IR 77-14.26 to 14.50 - Micro Surfacing; Lic-IR 70-16.51 to 16.75 - Micro Surfacing; Lic-IR 70-16.76 to 16.99 - Micro Surfacing; Lic-IR 70-19.26 to 19.50 - Micro Surfacing; Lic-IR 70-16.26 to 16.50 - Micro Surfacing; Lic-IR 70-15.76 to 15.99 - Micro Surfacing; Lic-IR 70-19.76 to 19.99 - Micro Surfacing; 93517~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - Safety Funded - CAP = $28,000.00 - Per-SR 669-12.76 to 12.99 - Mill & Fill 93517~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - Safety Funded - CAP = $85,000.00 - Kno-US 36-13.76 to 13.99 - Mill & Fill; Per-SR 669-01.00 to 01.25 - Mill & Fill; Per-SR 37-19.76 to 19.99 - Mill & Fill 97240~|~1~|~1~|~01/STR~|~BRO 62 9.22 105882~|~1~|~1~|~01/SAF~|~Intersection improvement at ATH US 50 8.64-8.83. Convert existing westbound right turn lane to an offset right turn lane. 106306~|~1~|~1~|~01/NFP~|~Installing raised pavement markers on various routes throughout District 4. 121004~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 - ODOT/City items 121004~|~1~|~2~|~02/NHS/CINC~|~Plan split for the 100% City funded items 99905~|~1~|~1~|~01/BRF~|~Bridge replacement of TR62B over Buck RunSFN 8031231 96057~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - Created for Construction of New Garage, Wash Bay, and Pole Building at existing ODOT Kno County Garage Facility. 121352~|~1~|~1~|~01/STR~|~STP Rural Plan Split 121352~|~1~|~2~|~02/S5K~|~STP 5,000 Plan Split 98218~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School (SRTS) funding and is eligible for 100% federal funds. Any funds needed ever the SRTS cap will be 100% local funds. 87118~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 78 7.58-7.91. Rural other federal aid funded 80 federal/20 state. 87118~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 78 7.91-8.84. GAL 588 10.83-11.71. Urban other federal aid funded 80 federal/20 state. 96704~|~1~|~1~|~01/NFA~|~TRU Brookfield Outpost, tie into sanitary sewer appoximately 800 to 1000' from garage. 103480~|~1~|~1~|~01/BRF~|~Work eligible for Municipal Bridge funding to replace SFN 1860002. 124949~|~1~|~1~|~01/MPO~|~Plan split for OKI Pilot Paving Program eligible expenses 88564~|~1~|~1~|~01/IMS~|~Pavement repairs and full depth pavement replacement 108776~|~1~|~1~|~01/S5K~|~All work in this project. 116929~|~1~|~1~|~01/MPO/HUDS~|~Intersection improvement. 122829~|~1~|~1~|~01/MPO~|~OKI CR funding (SAC 4CD7). Construction phase capped at $133,445 with a 20% match (TRC) 104040~|~1~|~1~|~01/NFA~|~The Village will improve Montgomery Road, from Stoll Rd to Stewart Rd, and Stewart Rd, from Montgomery Rd to Euclid Ave, to include major widening and upgrades to traffic signalization and pedestrian crossing. 102520~|~1~|~1~|~01/IMS~|~Add turn lanes to Interstate I-90 EB and WB exit ramps to reduce the amount of queuing along both sides of the intersection. 109742~|~1~|~1~|~01/S<2~|~AC overlay without repairs 109742~|~1~|~2~|~02/STR~|~AC overlay without repairs 94126~|~1~|~2~|~02/S>2~|~Resurfacing SUM SR 532 from 0.00 to 2.63. 94126~|~1~|~3~|~03/S>2/TALL~|~80/20 Urban paving of SUM SR 532 from 2.63 to 3.54 and SUM SR 532I from 0.00 to 0.03 in the City of Tallmadge, Summit County, Ohio. 94126~|~1~|~1~|~01/NHS~|~Resurfacing SUM US 224 from 14.87 to 16.07. 94126~|~1~|~5~|~05/S>2~|~See linked structure > 20' span. 94126~|~1~|~6~|~06/S>2~|~See linked structures 10' to 20' span. 94126~|~1~|~4~|~04/S>2/TALL~|~100% City of Tallmadge Items. 86562~|~1~|~1~|~01/MPO~|~Resurfacing of Main Avenue in the City of Massillon, Stark County, Ohio. 92134~|~1~|~1~|~01/NHS~|~resurface WOO US23 0.35 to 2.51 (Urban) 92134~|~1~|~2~|~02/NHS~|~Resurface US-23 from 2.51 to 6.02 (Rural) 92134~|~1~|~4~|~04/NHS~|~Woo-23-6.00 92134~|~1~|~3~|~03/NHS~|~WOO-23-3.02 97262~|~1~|~1~|~01/S<2~|~Landslide repair. 97276~|~1~|~1~|~01/NFA~|~Construct Leffler road. 91066~|~1~|~1~|~01/SAF~|~NB IR-71 Ramps & US-22 ? Restripe and widen US-22 to provide a WB right turn lane on US-22 at the NB IR-71 entrance ramp. ? Restripe US-22 to provide two WB through lanes through the IR-71 interchange. ? Restripe US-22 to provide EB dual left turn lanes at the entrance ramp to NB IR-71. ? Widen the NB IR-71 exit ramp to provide a 600' left turn lane, a 600' right turn lane, and a second right turn lane 410' in length. ? Remove the slip ramp at the entrance ramp to NB IR-71. ? Remove the access points to addresses #8020 and #8031 immediately east of the NB IR-71 ramps. SB IR-71 Ramps & US-22 ? Restripe and widen the SB IR-71 exit ramp to one 800' right turn lane and dual 600' left turn lanes. ? Restripe US-22 from three to two WB through lanes ? Eliminate right turns on red from the SBIR-71 exit ramp to US-22. ? Restripe US-22 to provide WB dual left turn lanes at the entrance ramp to SB IR-71. ? Remove the slip ramp at the entrance ramp to SB IR-71 88000~|~1~|~1~|~01/BRO~|~SFN 2514850/ FRA IR 70-22.920/ Bridge over IR 270(NB) - SLM 22.92 79087~|~1~|~1~|~01/MPO~|~Pavement widening 79087~|~2~|~2~|~02/MPO~|~Plan Split for 100% Local Items 124139~|~1~|~1~|~01/NHS~|~Construction inspection for COTA's W Broad St BRT project that is part of the LinkUs initiative and partially takes place along the unincorporated section of US-40 maintained by ODOT. 109055~|~1~|~1~|~01/NFP~|~ATB IR 90 Rest Area upgrade. 121147~|~1~|~1~|~01/STR~|~Work in this split 121147~|~1~|~2~|~02/S5K~|~Work Within this split 121147~|~1~|~3~|~03/STR~|~Work within this split 121873~|~1~|~1~|~01/STR~|~Remove and replace existing culvert 122221~|~1~|~1~|~01/NFA~|~NEVI Round 2B-80-D 111297~|~1~|~1~|~01/SAE~|~Licking County Engineer FY2024 project to install new and upgrade existing guardrail on various county roads. 4HB7 - See cap comments. 93471~|~1~|~1~|~01/STR~|~Rebuild deck edges, patch pier encasements, reface abutments, and seal deck edges on Stoney Creek, SFN 4603125 LOG SR 292 0879 Tributary to Mill Creek, SFN 4604121 LOG SR 708 0069 Great Miami River, SFN 4603907 LOG 559 0170 and SFN 4603966 LOG 559 0245 both on Tributary to Big Darby Creek. 122406~|~1~|~1~|~01/IMS~|~All items of work associated with the installation of fiber along I-70 in Franklin and Madison Counties. 106976~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - Resurfacing project in the City of Zanesville on CR 2008 from 0.00 to 0.98 using 4TA7 funds 104760~|~1~|~1~|~01/S<2~|~WAS 60 1.84-2.79 asphalt resurfacing. 80% Federal and 20% Local. WAS 676 21.97-22.06 WB, 22.06-22.49, 23.08-23.25. 104760~|~1~|~4~|~04/S<2~|~100% city items for ADA upgrades on SR 60 and SR 676. 100% local funded. 104760~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 676 12.42-20.70. 104760~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 60 2.79-2.88, 3.06-3.68 and WAS 676 20.70-21.97, 21.97-22.06 EB, 22.49-23.08 and WAS 821 0.00-0.17. Urban other federal aid funded 80 Federal/20 State. 104290~|~1~|~1~|~01/MPO~|~Plan split 96532~|~1~|~1~|~01/IMS~|~Generic Plan Split for the construction inspection for FY2019/2020 (C) 96377~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation on 4201051 KNO-36-3.75 Intersect: Over North Fork Licking River; BR Eligible for Rehabilitation: Length=86; SD/FO(1); SR=54.8; DSR=5; 95754~|~1~|~1~|~01/NHS~|~Milling and resurfacing of North Fairfield Road from Beaver Vu Drive to just north of Pebble Creek Drive, including curb ramp upgrades to ADA compliance, repair of deteriorated curb and sidewalk, and installation of raised pavement markers. 101344~|~1~|~1~|~01/STR~|~bridge rehab. 101344~|~2~|~2~|~02/STR~|~WIL-SR66 0.00 96248~|~1~|~1~|~01/NFP~|~Non-Fed, 100% State. SLM 0.00-9.92; 5103908 MAR-746-0625 over Otter Creek; 5103932 MAR-746-0905 over Olentangy River 96248~|~1~|~2~|~02/NFP~|~Concrete deck overlay on 5103908 MAR-746-6.25 & 5103939 5103908 MAR-746-9.05 92832~|~1~|~1~|~01/NFP~|~Culvert replacements on various routes in Portage County, Ohio. 92832~|~1~|~2~|~02/NHS~|~SFN 6701836 POR SR 59 6.59 over Wahoo Ditch and Abandoned RR and SFN 6705103 POR SR 261 3.99 over Breakneck Creek 94937~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split. 110588~|~1~|~1~|~01/NFA~|~Landslide repair project. WAS 676 3.33. Not on the federal aid system funded 100% state ER. 95362~|~1~|~1~|~01/SAF~|~for all spot locations. 100794~|~1~|~1~|~01/NHS~|~Culvert cleanout/erosion control project. HOC 33 19.12. DSR HOC-001. ER Funded 80% Federal and 20% State. 98545~|~1~|~1~|~01/STR~|~Funding splits for all work associated with bridge PRE-503-1170. 91883~|~1~|~4~|~04/STR~|~"04/STR/OT/ " - District Preservation Pavement Marking 4PS7(100% State) - No CAP - Striping after resurfacing on 1) Fai-SR 204-11.16 to 14.60; 2) Fai-SR 204-15.10 to 18.10; 91883~|~1~|~6~|~06/NFA~|~"06/NFA/OT/ " - District Preservation Marking Pavements 4PS7(100% State) - No CAP - Striping after resurfacing on 1) Fai-SR 204-08.10 to 19.13; 2) Per-SR 204-10.00 to 18.66; 91883~|~1~|~5~|~05/S<2~|~"05/S<2/OT/ " - District Preservation Marking Pavements 4PS7(100% State) - No CAP - Striping after resurfacing on Fai-SR 204-14.60 to 15.10 91883~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Fai-SR 204-14.60 to 15.10 91883~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Fai-SR 204-08.10 to 19.13; 2) Per-SR 204-10.00 to 18.66; 91883~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-SR 204-11.16 to 14.60; 2) Fai-SR 204-15.10 to 18.10; 117240~|~1~|~1~|~01/MPO~|~Sidewalk Work 118205~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 183 0.50. 120748~|~1~|~1~|~01/BRF~|~Federal/State Exchange project - State Funding 97203~|~1~|~1~|~01/NHS~|~Type A Emergency bridge repair project. Heat straighten 4 beams. ATH 7 2.53, SFN 0500062. NHS route funded 100% state. 93772~|~1~|~1~|~01/NFP~|~Two-Lane resurfacing project. MOE 255 11.66-18.08. Non-Federal Aid route, 100% State funds. 93772~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 800 0.00-13.80. Rural other federal aid funded 80 Federal/20 State. 109926~|~1~|~1~|~01/STR~|~All work for this project is in this plan split, using district preservation funds. 109926~|~1~|~2~|~02/SAE~|~Adding both centerline and edge line rumble strips throughout the entire length of the project. Funded 100% with safety funds. 109474~|~1~|~1~|~01/NFP~|~Resurfacing of Summit MetroParks driveway. 109427~|~1~|~1~|~01/MPO~|~Construction of a new 10 foot wide asphalt shared use path from Talawanda Middle School to Oxford Community Park. 113414~|~1~|~1~|~01/NHS~|~ER Project ROS-35-32.67 92974~|~1~|~2~|~02/S<2/ZANE~|~"02/S<2/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving with related work on: 1) Mus-SR 146-13.01 to 13.31; 2) Mus-SR 146-15.20 to 16.05; 3) Mus-SR 60G-00.00 to 01.09; 92974~|~1~|~6~|~06/S<2/ZANE~|~"06/S<2/OT/ZANE" - 100% City of Zanesville 4TA7/(80% Federal) / 4BG7(20% Local TC) - No CAP - ADA Ramps with related work on: 1) Mus-SR 146-13.01 to 13.31; 2) Mus-SR 146-15.20 to 16.05; 3) Mus-SR 60G-00.00 to 01.09; 92974~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Mus-SR 146-12.20 to 13.01; 2) Mus-SR 146-16.05 to 16.21; 92974~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation Funding 4PF7 (80% Federal) / 4 PS7 (20 % State) - No CAP - Resurfacing with related work on NHS Roadway segments: 1) Mus-SR 60-17.38 thru 17.50 92974~|~1~|~7~|~07/NHS/ZANE~|~"07/NHS/OT/ZANE" - 100% City of Zanesville 4TA7/(80% Federal) / 4BG7(20% Local TC) - No CAP - ADA Ramps with related work on: 1) Mus-US 40-11.24 to 11.78; 2) Mus-SR 60-16.76 to 17.38; 3) Mus-SR 60-17.50 to 17.93; 4) Mus-SR 60D-00.00 to 00.42; 5) Mus-SR 60D-00.67 to 00.77; 92974~|~1~|~5~|~05/NHS~|~"05/NHS/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP -Work on SFN 6001807 Mus-SR 60D-00.05 92974~|~1~|~4~|~04/NHS/ZANE~|~"04/NHS/PV/ZANE" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving with related work on: 1) Mus-US 40-10.37 to 11.78; 2) Mus-SR 60-16.76 to 17.38; 3) Mus-SR 60-17.50 to 17.93; 4) Mus-SR 60D-00.00 to 00.42; 5) Mus-SR 60D-00.67 to 00.77; 103954~|~1~|~4~|~04/NHS~|~This plan split includes all work needed to construct the new bridge over SR-32 as part of the interchange 103954~|~3~|~3~|~03/S>2~|~CR 388 (Bach Buxton) relocation to receive traffic from proposed Bach Buxton Interchange. 103954~|~1~|~1~|~01/NHS~|~New full movement interchange on SR 32 at Bach Buxton. This includes all new lighting. This work includes creating new ramps, road work on SR-32 eastbound from Glen Este to Old 74, roadwork on westbound SR-32 from Old 74 to Elick, realigning a portion of Bach Buxton (CR-388) and minor roadwork on Old 74 (CR 171) needed to create the new interchange. 103954~|~2~|~2~|~02/NHS~|~Widen SR 32 to provide westbound 3rd lane from the new interchange connecting to the existing 3rd lane west of Glen Este Withamsville. 103954~|~1~|~5~|~05/NFP~|~Retroactive fuel price adjustment 88773~|~1~|~1~|~01/S<2~|~District Allocation 80/20 4PF7/4PS7 88773~|~1~|~2~|~02/S<2/WADS~|~Federal/City - 4PF7/4BG7 88773~|~1~|~3~|~03/S<2/WADS~|~100% City of Wadsworth 102472~|~1~|~1~|~01/STR~|~Microsurfacing of COL-39 from SLM 7.19 to 13.08 102472~|~1~|~2~|~02/S<2~|~Microsurfacing of COL-39 from SLM 13.08 to 13.15 102472~|~1~|~3~|~03/NHS~|~Microsurfacing of COL-39 from SLM 13.15 to 13.57 104195~|~1~|~2~|~02/NHS~|~Resurfacing a portion of SR 129 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all necessary traffic control items. 104195~|~1~|~3~|~03/IMS~|~Bridge rehab. 104195~|~1~|~1~|~01/S>2~|~Reconfiguration of the interchange of SR-129 with Liberty Way and IR-75. 117332~|~1~|~1~|~01/NFA/PCEO~|~Bridge replacement of PER-C00025-2.00 (SFN 6430899) carrying Toll Gate Road over center branch of Rush Creek 124844~|~1~|~1~|~01/BRO~|~Posted single span box beam super replacement. 96718~|~1~|~1~|~01/NFP~|~Mowing 97534~|~1~|~1~|~01/IMS~|~I-75 bridge (SB) over Segur Ave 101049~|~1~|~1~|~01/STR~|~Chip seal various routes in Miami and Shelby Counties: MIA SR 41 SLM 0.00 to 5.68 == MIA SR 201 SLM 9.16 to 12.51 == MIA SR 48 SLM 16.88 to 19.40 == SHE SR 29 SLM 22.37 to 26.23 == SHE SR 47 SLM 0.00 to 3.92 103298~|~1~|~1~|~01/IMS~|~Split for mowing work 98113~|~1~|~1~|~01/BRF~|~Rehabilitation of the existing truss Bridge No. PRE-TR 437-0.09 (SFN: 6840248), which carries Foos Road over Price's Creek, including repair or replacement of substructure, superstructure, and bridge deck. 117489~|~1~|~1~|~01/NFA/SUCE~|~Bridge replacement. 93516~|~1~|~1~|~01/SAE~|~100% Federal Highway Safety Improvement Program funding to upgrade non-compliant end terminals on all NHS routes especially routes SR-44, SR-91, and US-422 in Geauga and Lake counties. 122337~|~1~|~1~|~01/NHS~|~Superstructure replacement on LIC SR 79 12.87 (SFN 4504925). 111396~|~1~|~1~|~01/MPO~|~Split for TLCI work 105546~|~1~|~1~|~01/STR~|~Rural plan split FAY-207 MAD-207 MAD-62 MAD-62D 98497~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 98872~|~1~|~1~|~01/MPO~|~Resurface Niles Vienna Rd from SR 46 to US 422 and Warren Ave from Niles W Corp limit to N Chestnut Ave in the City of Niles. Includes installing new curb ramps with truncated domes, replacing existing loop detectors and new thermoplastic pavement markings. 85090~|~1~|~2~|~02/NHS~|~This split is for resurfacing the portion of the project that is inside of the Kenton Urban Area and on the NHS. Work on SR 309 from CR 171 at 16.93 to 17.93. All funds are from the District Preservation Program budget. There are no local funds in this event. Although the road in this split is inside the Kenton Urban Area, it is outside of the City of Kenton. 85090~|~1~|~1~|~01/STR~|~This split is for resurfacing the portion of the project that is outside of the Kenton Urban Area. Work on SR 309 from the Urban Boundary at 18.44 to the County Line at 25.91. All funds are from the District Preservation Program budget. There are no local funds in this event. 85090~|~1~|~3~|~03/S<2~|~This split is for resurfacing the portion of the project that is inside the Kenton Urban Area and not on the NHS. Work on SR 309 from the location of the old Kenton Urban Area boundary at 17.93 to the new Kenton Urban Area boundary at 18.44. All funds are from the District Preservation Program budget. There are no local funds in this event. Although the road in this split is inside the Kenton Urban Area, it is outside the City of Kenton. 100460~|~1~|~1~|~01/ERD~|~Former CSX RR bridge over Maumee River 99679~|~1~|~2~|~02/STR~|~Resurfacing work on the rural STP portion from SLM 11.59 to SLM 14.47. 99679~|~1~|~1~|~01/S<2~|~Resurfacing work on the urban STP portion of the project from SLM 10.40 to SLM 11.59. 97160~|~1~|~1~|~01/S>2~|~Upgrading bridge terminal assemblies throughout Stark County 100187~|~1~|~1~|~01/CMQ~|~Upgrades to three existing signalized intersections in the City of Franklin: Riley Boulevard with (1) East 4th Street and (2) East 6th Street, and (3) East 6th Street with Anderson. Signals will be interconnected with fiber optic cable. 100747~|~1~|~1~|~01/BRO~|~SFN 7400934 92434~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1601776 COS SR93 1.95 Intersect: Trib Of Wills Creek; Not BR Eligible for Replacement: Length=11 SD/FO(1) SR=69.6 DSR=" " 106426~|~1~|~1~|~01/SAF~|~Complete sidewalks on the north side of Compton Rd, between Forest Ave and Werner Ave. 100254~|~1~|~1~|~01/MPO~|~Rehabilitate East 49th Street and Harvard Ave in the Village of Newburgh Hts using MPO STP funding. 119220~|~1~|~1~|~01/NHS~|~NHS plan split. 101125~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural route: CHP US 36 SLM 17.23 to 19.48. 83931~|~1~|~1~|~01/STR~|~Resurface the existing roadway along with other roadway related items on US 36 from Urbana East Corporation Limit (SLM 17.22) to the CHP/UNI County Line (SLM 29.05). 113690~|~1~|~1~|~01/STR~|~All the work to stabilize the eroding slope are in this plan split. All funds are from the District Preservation Program budget. 121381~|~1~|~1~|~01/NFA~|~Muskingum County Engineer's FY2029 pavement marking project funded by CEAO - 4HB7 @ 100% capped at $150,000. 116944~|~1~|~2~|~02/STR~|~Bridge Work to be included with overlay project SFN 7004907 116944~|~1~|~1~|~01/STR~|~AC Overlay w/ Repairs RIC-95-0.00 to 3.638 86580~|~1~|~1~|~01/STR~|~0803723 BRO SR505 7.21 Intersect: Trib Of E Br Bullskin Crk80 fed/20 state 01/STR/BR/State 104654~|~1~|~1~|~01/NFA~|~New Yard. 113410~|~1~|~1~|~01/NHS~|~Install recessed wet reflective pavement markings on various routes in District 10. ATH 33 14.25-16.27, ATH 50 14.14-17.50, MEG 33 4.26-10.02, MEG 124 20.78-22.08, GAL 735 0.00-1.14 and WAS 7 17.60-20.23. Funded 80% Federal Safety/20% State. 113410~|~1~|~2~|~02/S<2~|~Install recessed wet reflective pavement markings on MEG 124 20.66-20.78 and MEG 833 4.61-4.70. Funded 80 Federal/20 State. 105589~|~1~|~1~|~01/S>2~|~Columbus urban area plan split: DEL-61-0.43-2.72 DEL-745-1.82-2.57 DEL-36-6.94-7.26 105589~|~1~|~2~|~02/STR~|~Rural plan split: DEL-61-2.72-7.84 DEL-36-0.00-1.29 DEL-36-2.78-6.94 DEL-36-17.64-18.03 105589~|~1~|~3~|~03/NHS~|~NHS plan split: DEL-23-8.39-8.74 DEL-23-8.75-9.00 FRA-161-15.06-17.12 105589~|~1~|~4~|~04/S<2~|~Urban paving in the City of Delaware: DEL-23-8.74-8.75 105589~|~1~|~5~|~05/IMS~|~Interstate plan split: FRA-70-15.29-19.37 93310~|~1~|~1~|~01/S<2~|~Marion urban paving of:MAR-309D: 0-0.34MAR-739: 7.78-9.69 106827~|~1~|~1~|~01/NFP~|~Plan split for tree trimming work 115474~|~1~|~1~|~01/NFP~|~Resurfacing Road R01 in the Mosquito State Park. 96255~|~1~|~1~|~01/NFP~|~Facility funding 122211~|~1~|~1~|~01/NFA~|~NEVI Round 2B 77-A 119820~|~1~|~1~|~01/SAF/STRU~|~Adding bike lanes and traffic calming measures at the Bridge St/Lowellville Rd intersection. 90112~|~1~|~1~|~01/BRO~|~4803361 LUC IR75 4.34 Intersect: Delaware Ave 101528~|~1~|~1~|~01/STR~|~DSR# HOL-002 121061~|~1~|~1~|~01/NHS~|~Resurfacing 121061~|~1~|~2~|~02/STR~|~Resurfacing 95540~|~1~|~1~|~01/STR~|~General System resurfacing including pavement repairs and pavement marking on TUS-39 from 0.71 to 2.94 and 7.14 to 8.81 95540~|~1~|~2~|~02/NHS~|~Resurfacing TUS-39 from SLM 9.96 to 10.14 and TUS-211 including pavement planing, asphalt overlay and pavement markings. 95540~|~1~|~3~|~03/S<2~|~Resurfacing TUS-39 from 8.81 to 9.15 and from 10.14 to 10.24, including pavement planing, asphalt overlay and pavement markings. 95540~|~1~|~4~|~04/STR~|~Work includes pavement repairs within the Village of Sugarcreek. 93605~|~1~|~2~|~02/IMS~|~Construct two lane roundabout at I-70 EB exit/entrance ramps.Expansion of second lane of northern roundaboutWidening of SR 29 93605~|~1~|~1~|~01/STR~|~New bridge over I-70 97900~|~1~|~1~|~01/S>2~|~CR 536 - Reconstruction of the roadway including curb, sidewalk, concrete base, asphalt pavement, storm sewer, street lighting, landscaping and street amenities. 108153~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FAY-22-7.25-8.36 FAY-62D-0.00-0.87 118904~|~1~|~1~|~01/STR~|~Resurfacing SR 9 119347~|~1~|~1~|~01/S>2~|~Superstructure replacement. 122950~|~1~|~1~|~01/NFP~|~Created for J&C involvement 111536~|~1~|~1~|~01/IMS~|~To replace 15? storm pipe, approximately 40? between manhole and 108? combined sewer. 96209~|~1~|~1~|~01/NFA~|~Roadway improvements to support an expansion by Rexarc International in the Village of West Alexandria, including construction of a new access road to the east of Rexarc to provide new access and connect Third Street and Main Street (SR-503), and improvements to existing service roads at Rexarc's perimeter. 118110~|~1~|~1~|~01/MPO~|~Plan Split for MP STBG funding 109487~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 116440~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in Portage, Stark and Summit counties. 112132~|~1~|~1~|~01/SAF~|~Safety related funds plan split 98143~|~1~|~1~|~01/NHS~|~NHS 80/20 Non-BR Eligible FAY-435-0.17 over US35 98143~|~1~|~2~|~02/STR~|~STP Rural 100% State Non-BR Eligible FAY-729-1.39 over Rattlesnake Creek 101943~|~1~|~1~|~01/STR~|~Emergency culvert replacement on PIK CR 68 3.99 107982~|~1~|~1~|~01/SAF~|~Repairs to an existing drilled pier retaining wall damaged during an ER event. 118767~|~1~|~1~|~01/NHS~|~Resurfacing. 96833~|~1~|~1~|~01/S>2~|~Pavement work 96833~|~1~|~2~|~02/NFP~|~100% local cost items 96833~|~1~|~3~|~03/NFP~|~Split 3 for 100% GCRTA charges for signal work on E.55th at the RTA station. 77920~|~1~|~1~|~01/IMS~|~Minor Rehab on GRE IR 675 that also includes safety upgrades, deck replacement, increasing vertical clearance and widening of the North Fairfield Bridge over IR675. Pavement limits are from SLM 9.48 to SLM 14.88 77920~|~1~|~3~|~03/SAF~|~Includes Costs associated with the traffic and safety improvements on North Fairfled Road. This improvement includes widening of North Fairfield Road, rehabilitation and widening of the GRE-675-1034 bridge on North Fairfield Rd over I-675, interchange intersection modifications, and other related work. Safety funds shall be used first, MVRPC funds shall be used second, and District Allocation funds shall be used third for this work. Safety funds are capped at $2.2 million. MVRPC funds are capped at $1,760,000. 77920~|~1~|~2~|~02/IMS~|~Plan split for all interstate bridge work that is NOT associated with the GRE-675-1034 bridge. 81605~|~1~|~1~|~01/ERD~|~Existing lanes to be widened to standard widths, drainage will be improved, signals well be upgraded and coordinated, turn lanes will be provided to improve traffic flow and bicycle lanes will be provided, and existing pavement and curves will be replaced between Graham Road and West Bath Road, in the City of Cuyahoga Falls, Summit County, Ohio. 81605~|~1~|~2~|~02/SAF~|~Existing lanes to be widened to standard widths, drainage will be improved, signals well be upgraded and coordinated, turn lanes will be provided to improve traffic flow and bicycle lanes will be provided, and existing pavement and curves will be replaced from West Bath Road to Steels Corners Road, in the City of Cuyahoga Falls, Summit County, Ohio. 122375~|~1~|~1~|~01/NFP~|~Funding split for OPRA funded projects 101758~|~1~|~1~|~01/BRF~|~Replace SFN 0432482 ATB Harpersfield Rd Bridge over the Grand River. 116736~|~1~|~1~|~01/NHS~|~Split for NHS route paving 112725~|~1~|~1~|~01/IMS~|~Replace FRA-665-9.88 with box 94120~|~1~|~2~|~02/STR~|~Bridge maintenance on SFN 7801505 TRU SR 5 32.56 over Stratton Creek. 94120~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 5 from 32.50 to 35.52 100778~|~1~|~1~|~01/NFA~|~Resurfacing of bike trails in poor condition on the Troy Recreation Trail 101245~|~1~|~2~|~02/NFP~|~Plan split for any work added by CSU 101245~|~1~|~1~|~01/NFP~|~Plan Split for work on raodways, drainage, curbs, and sidewalks on CSU's campus 98508~|~1~|~1~|~01/IMS~|~Plan split for all work associated with sealing interstate bridges. 94477~|~1~|~1~|~01/NHS~|~SFN 0600210, AUG 33-0442, Miami & Erie Canal - Rehab existing canal pipe with a structural liner. 101090~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 101090~|~1~|~1~|~01/NHS~|~AC Overlay with repairs. 101090~|~1~|~3~|~03/S<2~|~Placement of high friction surface treatment on east bound ramp from US 40 to SR 4 101090~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 123933~|~1~|~1~|~01/STR~|~Slope stabilization along on SR 60 in Coshocton County. 120121~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement 119824~|~1~|~1~|~01/IMS~|~Plan split for interchange reconstruction 93015~|~1~|~1~|~01/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 33-17.44 to 24.86 93015~|~1~|~2~|~02/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge Deck Sealing along US 33 87629~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for replacement of RPM's within District 5 on IR; US; and SR 101072~|~1~|~1~|~01/IMS~|~Pavement markings 96872~|~1~|~1~|~01/MPO~|~Mill 2", complete full depth pavement repairs, pave 3" asphalt concrete. 96872~|~1~|~2~|~02/MPO~|~Urban Portion 96872~|~1~|~3~|~03/ENH~|~100% City Items 88711~|~1~|~3~|~03/STR~|~District Wide bridge sealing for FY2017. This plan split for the rural locations. Actual bridges to be determined later. 88711~|~1~|~1~|~01/IMS~|~District Wide bridge sealing for FY2017. This plan split for the interstate locations. Actual bridges to be determined later. 88711~|~1~|~2~|~02/NHS~|~bridge seal the NHS bridges 95983~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus- SR 60 25.08 to 35.51 95983~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-60-22.36 to 25.08 116435~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in ATB, MAH and TRU counties. 90389~|~1~|~1~|~01/ENH~|~MORPC enhancement funding for multi-use path along Big Walnut Creek from Pizzuro Park Drive to Galloway Reserve.Gahanna is sponsor. 79902~|~1~|~1~|~01/S>2~|~4805313 LUC SR51 6.65 Intersect: Ten Mile Creek 124063~|~1~|~1~|~01/NHS~|~All work included in this plan split. 112874~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work. 120126~|~1~|~1~|~01/S50~|~Bridge Hit Repairs. 116398~|~1~|~3~|~03/STR~|~Chip sealing. 116398~|~1~|~2~|~02/S5K~|~Chip sealing. 116398~|~1~|~1~|~01/S>2~|~Chip sealing. 116398~|~1~|~4~|~04/NFA~|~Chip sealing. 91418~|~1~|~1~|~01/NHS~|~Plan Split for the NHS locations within the project: BUT-127, CLI-68 from SLM 20.3-20.48, and WAR-122 91418~|~1~|~2~|~02/STR~|~Plan Split for the rural locations within the project: CLI-22 from SLM 0-5.8 and 12.57-17.6, CLI-68 from SLM 20.48-23.32, CLI-380, and GRE-380 from SLM 0-6.38 91418~|~1~|~3~|~03/S>2~|~Plan Split for the Urban locations: GRE-380 from SLM 6.38-7.03 119404~|~1~|~1~|~01/S5K~|~Covered Bridge Restoration 121528~|~1~|~1~|~01/NHS~|~NHS Plan Split 124514~|~1~|~1~|~01/STR~|~STP plan split. 98322~|~1~|~1~|~01/STR~|~HIG 50 7.42-11.50 98322~|~1~|~2~|~02/S<2~|~HIG 50 11.50-11.85 98322~|~1~|~3~|~03/NHS~|~HIG 50 11.85-12.27 98322~|~1~|~4~|~04/STR~|~Bridge plan split placeholder. 105161~|~1~|~1~|~01/NFP~|~All work in this project. 100% state funds from the District Preservation Program budget. 100639~|~1~|~1~|~01/S>2~|~Plan Split for roadway work in the Large Urban sections:CLE-126: SLM 0-2.16HAM-126: SLM 22.28-25.41 76413~|~1~|~1~|~01/NHS~|~Plan Split for TRU SR 82 from 14.08 to 17.47 76413~|~1~|~2~|~02/NHS~|~Plan Split for SFN 7804636, TRU SR 82 14.79 under North River Rd, SFN 7804660 TRU SR 82 16.30 under SR 82. SFN 7804679 TRU SR 82 16.78 R under SR 82, SFN 7804695 TRU SR 82 16.90 L under SR 82. SFN 7804709 TRU SR 82 17.16 CR under SR 82, SFN 7804717 TRU SR 82 17.20 R under Ramp G (EB 82). 119342~|~1~|~1~|~01/STR~|~Resurfacing. 117356~|~1~|~2~|~02/BRF~|~Bridge replacement for SCI TR 100 1.63 (SFN 7333013) 117356~|~1~|~1~|~01/BRF~|~Bridge Replacement (SFN 7332998) 120014~|~1~|~1~|~01/NFP~|~Resurfacing of parking lots operated by ODNR 98250~|~1~|~1~|~01/NHS~|~Preventive Maintenance - Smoothseal: MED-224-0.00-6.25 98250~|~1~|~2~|~02/STR~|~STP Rural smoothseal: MED-42-0.00-1.89MED-42-7.12-14.40WAY-42-0.38-3.31WAY-539-12.74-13.43 98250~|~1~|~3~|~03/STR~|~Minor bridge work associated with this project 98294~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP - deck replacement on 1) 6001920 MUS IR70 11.44A Intersect: Ramp A Over McIntire Avenue; BR Eligible for Rehabilitation: Length=149 SD/FO(2) SR=76.0 DSR=6; 101896~|~1~|~1~|~01/BRF~|~Bridge replacement 95059~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $300,000.00 for CO and $30,000.00 for CE - Rock scaling with installation of 650 feet of 50" CIP barrier on Gue-IR 77-14.07 105869~|~1~|~1~|~01/SAF~|~Plan split 95637~|~1~|~2~|~02/S>2~|~CEAO funded STP project to reconstruct intersection of CR11/CR140. 95637~|~1~|~1~|~01/S>2~|~CEAO funded STP project to reconstruct intersection of CR11/CR140. 112406~|~1~|~1~|~01/SAF~|~CEAO safety funded item plan split 79516~|~1~|~1~|~01/BRF~|~Replacement of the existing structure with a three span structure with roadway approach work and guardrail work. SFN# 0432954 over the Grand River. 117138~|~1~|~1~|~01/MPO/NFRA~|~Resurfacing. 112901~|~1~|~1~|~01/STR~|~Culvert replacement. 97629~|~1~|~1~|~01/BRF~|~Replace MAR-TR 28D-3.78 (Dry Lane Rd S) structure over Clements Ditch SFN 5130603. 97629~|~1~|~2~|~02/BRF~|~Replace MRW-CR 30-6.28 (Mt Gilead-Iberia Galion Rd) structure over Tributary of Thorne Run SFN 5933056. 97629~|~1~|~3~|~03/BRF~|~Replace MRW-TR 50-1.72 (Chestnut Ridge Rd) structure over Tributary of Cedar Fork Creek SFN 5932866. 90649~|~1~|~1~|~01/ENH~|~Constructing sidewalks along SR-3 (SLM 24.29 to SLM 26.67) 90649~|~1~|~3~|~03/SAF~|~100% City of Columbus for payment of excess materials 90649~|~1~|~2~|~02/NHS~|~D6 funding to correct drainage issue at bullnose of concrete median on FRA-3 just S of I-270. 100480~|~1~|~1~|~01/NHS~|~BRO 52 (0.00-4.25) 116168~|~1~|~1~|~01/SAF~|~Guardrail installation project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%. 93553~|~1~|~1~|~01/SAF~|~Sign upgrade on loop ramps on or inside I-270 117577~|~1~|~1~|~01/SAF~|~Pedestrian improvements only including crosswalks, sidewalks, RRFBs, curb ramps, etc. 117577~|~1~|~2~|~02/SAF~|~All other local roadway improvements 97232~|~1~|~1~|~01/S>2~|~CEAO/FRA County funding for intersection improvement of Winchester Pike/Shannon/Ebright 87408~|~1~|~1~|~01/CMQ~|~South Avenue Signals 114506~|~1~|~2~|~02/S5K~|~Plan split for the small urban section of CLI-730 114506~|~1~|~1~|~01/STR~|~Plan Split for the rural sections of CLI-28 and CLI-730; including roadway and bridge locations 116740~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing. 94968~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 114982~|~1~|~1~|~01/STR~|~Reactive maintainance 109791~|~1~|~1~|~01/S<2~|~Microsurface on: LOG-273 SLM 0.00 to 2.02 LOG-368 SLM 0.00 to 2.59 109791~|~1~|~2~|~02/NFA~|~Microsurface on: LOG-273 SLM 6.46 to 7.71 92760~|~1~|~1~|~01/NFA~|~Herbicidal Spray. 100% state maintenance funds. 01/NFA/OT/State 113958~|~1~|~1~|~01/MPO~|~Resurfacing eligible items 119058~|~1~|~1~|~01/IMS~|~Plan split for project to Paint the HAM-71-1530 bridge that carries Zig Zag Rd over I-71 and the HAM-17-1581L/R bridges that carry I-71 over Pfeiffer Rd. Rehab will include other repairs such as patching and sealing. 113399~|~1~|~1~|~01/NHS~|~Construction on an access road to the Barker house. Work includes new alignment and minor drainage work. WAS 7 32.39 121408~|~1~|~1~|~01/IMS~|~Plan Split for noise wall repairs along the interstate locations 92674~|~1~|~1~|~01/MPO~|~Resurfacing from Norton Road to Terex Road (SLM 10.41-11.58) 93306~|~1~|~1~|~01/SAE~|~Adding battery back up to signalized intersections in Ashtabula and Trumbull counties on US20, IR90, SR193 and SR45 102168~|~1~|~1~|~01/NFA~|~The City is constructing road improvments and signalization to the plan entrance at State Route 55 and Fenner Road. 96291~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 329 11.93, SFN 0503541. Rural other federal aid funded 80 federal/20 state. 119055~|~1~|~1~|~01/S5K~|~Resurfacing GAL-160-3.25-3.70 and GAL-160A-0.00-0.74. Urban federal aid funded 80 Federal/20 State. 119055~|~1~|~2~|~02/STR~|~Resurfacing project using a microsurfacing treatment. GAL 160 3.70-10.43. Rural federal aid funded 80 Federal/20 State. 96282~|~1~|~1~|~01/NFP~|~Northwood full service maintenance facility. 94276~|~1~|~1~|~01/MPO~|~Resurfacing of County Route 15 (South Arlington Road) from SLM 0.00 to SLM 2.06, in the City of Green, Summit County, Ohio. 105850~|~1~|~1~|~01/NHS~|~Lining of MAR-23-1.523 culvert 90289~|~1~|~1~|~01/S>2~|~URBAN PAVING PROGRAM Pavement planing and resurfacing with Item 446, Asphalt Concrete on MOT SR 741 from SLM 3.62 to 4.56. 90289~|~1~|~2~|~02/SAF~|~Installation of curbs, sidewalks, and drainage 0.01 mile North on State Route 725 to Miamisburg North Corporation Limit. 98817~|~1~|~1~|~01/BRF~|~Bridge Replacement--Bowman Street over Touby Run. 101548~|~1~|~1~|~01/NHS~|~Landslide Repair, WAS US 50 5.50. DSR WAS-004 ER funded, 80% Federal and 20% State. 109753~|~1~|~1~|~01/S5K~|~Resurfacing and related roadway work items on LIC-657. 109753~|~1~|~2~|~02/NFA~|~Resurfacing and preventative bridge maintenance on LIC-657 95489~|~1~|~1~|~01/ENH~|~Champion Creek District Bicycle & Streetscape enhancements on South Cour Road, LaFayette Road, South Broadway Street and Grant Street. 99818~|~1~|~1~|~01/S<2~|~SCI US23 Grant Bridge 124493~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement. 116794~|~1~|~1~|~01/IMS~|~MOWING 112186~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at the STA IR 77/US 30 interchange. 87681~|~1~|~1~|~01/CMQ~|~80% Federal / 20% Local MPO CMAQ funding for the City of Solon's city-wide signal upgrading. 87681~|~1~|~2~|~02/CMQ~|~100% local participation for work not eligible for CMAQ funding. 116324~|~1~|~1~|~01/STR~|~Plan Split for chip sealing on rural locations 112961~|~1~|~1~|~01/STR~|~Overlay on HIG 138 115014~|~1~|~1~|~01/STR~|~Superstructure replacement. 111105~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of the bridges at Kno-US 36 32.68; Kno-US 36 32.82; and Kno-US 36 34.28; 92358~|~1~|~2~|~02/NHS~|~NHS Route BEL SR7 Sealing of Mine opening. GSMP Funds. 92358~|~1~|~1~|~01/NHS~|~NHS Roadway BEL SR7 Mine Opening sealing project. GSMP funds. 123459~|~1~|~1~|~01/NFP~|~CO CE FY30 94506~|~1~|~1~|~01/STR~|~Replace 30" culvert at WAR-741-1227, regrade slopes and install catch basins. Replace or rehabilitate the CMP arch at CLI-73-0356. Replace or line the 60" CMP arch at CLI-22-0049. Pave the invert of CLI-28-1538 (60" CMP) and cleanout the vegetation and sediment buildup at inlet and outlet channels. Pave invert of CLI-28-1450 (60" CMP) and repair undermined concrete apron. Sprayline culvert WAR-48-0348. Replace 52"x30" CMP at WAR-741-1138. 94506~|~1~|~2~|~02/S>2~|~Replace WAR-123-2703 small culvert. 104243~|~1~|~1~|~01/S>2~|~Split for paving on the urban system. 104243~|~1~|~2~|~02/NFP~|~Work not eligible for urban paving funding 100439~|~1~|~1~|~01/NHS~|~Deck Sealing FY 196601596 PIK 32 13230 L 6601626 PIK 32 13230 R 6601669 PIK 32 13740 L 6601677 PIK 32 13740 R 6601693 PIK 32 13960 L 6601707 PIK 32 13960 R 6601723 PIK 32 14330 L 6601731 PIK 32 14330 R 6601790 PIK 32 17650 L 6601812 PIK 32 17650 R 6601871 PIK 32 15740 L 6601901 PIK 32 15740 R 6601960 PIK 32 20140 L 6601979 PIK 32 20140 R 6601987 PIK 32 21280 L 6602010 PIK 32 21280 R 6602045 PIK 32 22610 L 6602134 PIK 32 22610 R 6602169 PIK 32 24150 N 6603467 PIK 32 2470 L 6603475 PIK 32 2470 R 111562~|~1~|~1~|~01/BRO~|~Muni-Bridge funded items 118612~|~1~|~1~|~01/NHS~|~added plan split. 100525~|~1~|~1~|~01/STR~|~PLan Split for all raodway work on the project on SR 131 in Clermont County from Goshen Road to the Bornw County Line. 116754~|~1~|~1~|~01/S>2~|~Resurfacing. 114272~|~1~|~1~|~01/IMS~|~Mowing contract 124520~|~1~|~1~|~01/NHS~|~rockfall plan split. 123882~|~1~|~1~|~01/IMS~|~Plan split for bridge deck replacement on the interstate system 91606~|~1~|~1~|~01/BRO~|~Replace deficient bridge deck with limited pavement work between bridges and limited pavement work in North and South approaches to the project. MOT 75 10.44 includes structural steel repair for intermediate joints. 91606~|~1~|~2~|~02/IMS~|~Replace deficient bridge deck with limited pavement work between bridges and limited pavement work in North and South approached to the project. SFN 5707080 - MOT IR 75 10.78 91606~|~1~|~3~|~03/IMS~|~Roadway/Paving related items (ramps, median barrier replacement, Texas turnaround related to the bridge work on IR 75 - Paving the Edwin C. Moses interchange ramps - Guide sign replacement along Edwin C. Moses Blvd. 91606~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 101144~|~1~|~1~|~01/SAF~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide. 101144~|~1~|~2~|~02/SAE~|~100% Safety plan split for New Signal at Woo-25 and Five Point Road 105763~|~1~|~1~|~01/MPO~|~Widening the roadway to increase lane widths, mill and fill of pavement with spot repairs where needed. Installation of a retaining wall where a slide exists on the east side of the roadway, installation of sidewalk where it currently does not exist, and construction of a shared use path from South Filview Circle to Wesselman Road. 105763~|~1~|~2~|~02/MPO~|~Plan split for TA eligible work, i.e. construction of sidewalk and multi use path. 100935~|~1~|~1~|~01/STR~|~Microsurfacing of ATB SR 45 0.00 to 1.87, ATB SR 307 14.25 to 17.07, TRU SR 45 21.14 to 23.76 and TRU SR 88 0.00 to 2.99. 115633~|~1~|~1~|~01/SAF~|~Raised crosswalk and curb bump outs at Harrison and Kling 115633~|~1~|~2~|~02/SAF~|~Installation of raised crosswalk and bump-outs on Harrison Ave. at Ruehlman Pl and on Central Ave. at W 8th St. Includes new curb ramps and drainage improvements as needed 105566~|~1~|~1~|~01/S<2~|~Urban Paving 116954~|~1~|~1~|~01/S5K~|~Overlay bike path 91728~|~1~|~1~|~01/BRO~|~Replace SHE 75 overpass with insufficient (non-standard) vertical clearance in advance of a major rehab of Interstate 75 on SFN 7501447 SHE IR 75 0102 on CR 132 East Lockington 123485~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work. 115932~|~1~|~1~|~01/NFP~|~Created for J&C involvement 92707~|~1~|~1~|~01/MPO~|~Highland Ave. CR 515 0.00-0.36 and Diamond St. CR 513 1.00-1.55 113778~|~1~|~1~|~01/NHS~|~Rockfall repair project. WAS 7 39.12. Work includes rock bolts and shotcrete. 107226~|~1~|~1~|~01/CMQ~|~Upgrade of 10 signals within the Village of Poland. 106994~|~1~|~1~|~01/STR~|~GSMP slide repair. 112878~|~1~|~2~|~02/STR~|~Replacement of conduit crossing (CFN: 1801382) & catch basin at SLM 11.38 112878~|~1~|~3~|~03/STR~|~Replace UNI-739-0900 (Over Brush Creek) with Box Culvert. 112878~|~1~|~1~|~01/STR~|~UNI-739 from 6.21 to 14.27; reconstruction of pavement, bridge deck sealing, upgrade guardrail and other miscellaneous work 88749~|~1~|~1~|~01/IMS~|~Priority System preventive maint. on TUS-77-7.55 to 12.30 ; includes mill and fill of surface course only 101950~|~1~|~1~|~01/NHS~|~Resurfacing. 25874~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing of the interstate GUE IR70 17.55-22.80 25874~|~1~|~4~|~04/STR~|~"04/STR/PV/ " - District Preservation Pavement Marking - 4MP7 (100% State) - No CAP - Pavement Marking on Gue-SR 265-00.00-04.59 96731~|~1~|~1~|~01/STR~|~STP Rural Smoothseal: ASD-60-30.32-32.83 / CRA-598-11.00-15.36 / CRA-602-0.00-4.25 / ERI-61-4.77-7.21 / HUR-61-3.06-6.70 / HUR-61-12.08-14.86 96731~|~1~|~3~|~03/NFA~|~Non-Federal Aid Smoothseal: CRA-39-0.00-4.02 96731~|~1~|~2~|~02/S<2~|~STP < 200000 Smoothseal: ERI-61-7.21-7.99 / HUR-61-2.91-3.06 / HUR-61-14.86-16.96 120384~|~1~|~1~|~01/NHS~|~Plan split for land slide repair 122808~|~1~|~1~|~01/MPO~|~City of Springdale installation of EV charging stations 116865~|~1~|~1~|~01/S>2~|~Install a new traffic signal at the IR 71 southbound ramps and SR 48 intersection. Extend the northbound SR 48 left turn lane to IR 71 southbound. Widen SR 48 northbound to extend the 3 lane section through the IR 71 southbound ramps and SR 48 intersection. 116865~|~1~|~2~|~02/IMS~|~Resurface the I-71 NB exit ramp and the I-71 SB entrance ramp to correct pavement friction deficiency. 121252~|~1~|~1~|~01/SAF~|~Plan split for systematic signal upgrades and installations 94527~|~1~|~2~|~02/MPO/DEL~|~100% City of Delaware funding for water line 94527~|~1~|~1~|~01/MPO~|~MORPC/Delaware funding to upgrade 23/Pennsylvania interchange 83793~|~1~|~2~|~02/SAF~|~adjusting manhole/water valve castings, waterline work - 100% Lorain County 83793~|~1~|~1~|~01/S<2~|~Roadway widening - Installing a right turn lane & 2 way left turn lane - Safety Funds 83793~|~1~|~3~|~03/S<2~|~Plan Split 3 for Local Detour Route Repairs using 100% State District Allocation Funds. 99918~|~1~|~1~|~01/BRF~|~CEAO funded bridge rehab on Centerburg Rd over Culver Creek 97875~|~1~|~1~|~01/NHS~|~Upgrade Light and Acceleration lane 96258~|~1~|~2~|~02/NFA~|~Bridge replacement. City of Jackson Huron St. Bridge (SFN 4060393). Under OBPP 96258~|~1~|~1~|~01/NFA/JAC~|~Bridge replacement. City of Jackson Dickason St. (SFN 4060490) 120393~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 111492~|~1~|~1~|~01/SAF~|~Realign westbound SR-32 to re-establish three westbound through lanes from Glen Este Withamsville to I-275. Evaluate potential to realign ramps from westbound SR-32 to southbound I-275 to improve vertical clearance. 111492~|~1~|~2~|~02/BRO~|~This work includes all work associated with SFN 1305735 99950~|~1~|~1~|~01/SAF~|~Replace/extend approximately 6,000 ft of guardrail on various county routes throughout Stark County. 100762~|~1~|~1~|~01/NHS~|~Concrete Pavement Repair. HOC US 33 14.69 WB - 16.06 WB. NHS, Federal/State 80/20% funding. 95007~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 115411~|~1~|~1~|~01/S>2~|~Pedestrian/Bike Facilities on East Cooke Rd between Karl Rd and Cleveland Ave 105726~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 105726~|~1~|~3~|~03/NFP~|~work requested by the LPA that is not eligible for federal-aid 105726~|~1~|~2~|~02/MPO~|~TLCI Implementation eligible work for the City of Parma Heights 100498~|~1~|~1~|~01/NFA~|~ADA 137 (0.00-3.56) 123148~|~1~|~1~|~01/NHS~|~Plan split for rehabilitation of concrete pavement 90461~|~1~|~1~|~01/STR~|~Concrete deck replacement. ATH 13 0812 (SFN 0500194). Rural other federal aid funded 80 federal/20 state. 96710~|~1~|~1~|~01/ENH/LIMA~|~Work funded by the ODOT Central Office managed Transportation Alternatives Program. Funding is 80% federal and 20% local funds. The City of Lima will provide the 20% local funds. 107541~|~1~|~1~|~01/STR~|~Resurfacing HOL-62 and HOL-60 105359~|~1~|~2~|~02/IMS~|~Lamp replacements at 56 locations. Battery Backup replacements at 5 locations. 105359~|~1~|~1~|~01/NHS~|~MED SR 0018 Sign Installations at 15.11 & 15.42Updated SR 602 and CR 0330 signage and removal of overhead flasher 78609~|~1~|~1~|~01/BRF~|~Bridge ReplacementProject Termini: On CR42A, bridge is 0.28 mile from the Clermont County Line. Project Description: In Brown County, it is proposed to replace a bridge (SFN 0833436) (0.28) on CR42A over Bullskin Creek. Bridge is BR funding eligible with CEAO Federal Funds providing 95% and the local providing 5%. BR Eligible. 80/20 split local match Brown Co., 01/BRO/BR/BRO 94431~|~1~|~1~|~01/S<2~|~Bridge Replacement 107557~|~1~|~1~|~01/SAF~|~Systematic replacement of signs at various locations in Fayette and Pickaway counties. 100385~|~1~|~1~|~01/S<2~|~New roadway/connector 113731~|~1~|~1~|~01/NFP~|~"01/NFA/PV/ - 100% State Funded (4BF7) - resurfacing route(s) within Salt Fork State Park. 113804~|~1~|~2~|~02/SAE~|~Safety funds - 4HJ7 - for Thermoplastic 113804~|~1~|~1~|~01/SAE~|~Pavement Marking - 4HB7 - Paint 113804~|~1~|~3~|~03/SAE~|~CE for 4HJ7 Safety funds 112607~|~1~|~1~|~01/ENH~|~Installation of new sidewalks along TRU SR 5 from the town square to Lakeview Dr NE in Kinsman Township. 110617~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing of SR-37 in Union County. 109311~|~1~|~1~|~01/SAF~|~Pavement marking on various county roads 100% 4HB7 CEAO Safety funds. 109066~|~1~|~1~|~01/S<2~|~Bridge replacement project. WAS CR 20 6.58, SFN 8430519. 98624~|~1~|~1~|~01/MPO~|~80/20 federal funds with local match for all eligible work. 100981~|~1~|~1~|~01/NHS~|~DSR# JEF-001 114893~|~1~|~1~|~01/NHS~|~Resurfacing. 114893~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance. 85529~|~1~|~1~|~01/IMS~|~Funding split for pavement work on the interstate 121625~|~1~|~1~|~01/NHS~|~Repair of the CLE-32-0684 bridge due to over height vehicle impact. 117912~|~1~|~1~|~01/NFA~|~NEVI Phase1 I-71-E, MED, CUY 226-245 117912~|~1~|~2~|~02/NFA~|~NEVI Phase I-74-A, HAM 1-18 100632~|~1~|~1~|~01/IMS~|~Double application microsurfacing on BUT IR 75 SLM 5.51 to 7.14 112175~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span. 112876~|~1~|~1~|~01/STR~|~MAR-739 & MAR-47 general resurfacing plan split. 112876~|~1~|~2~|~02/STR~|~Pavement repairs in the Village of Waldo. 100619~|~1~|~1~|~01/NHS~|~Sealing of bridge decks at various locations throughout the state 88933~|~1~|~2~|~02/NHS~|~See linked structures > 20' span. 88933~|~1~|~4~|~04/S<2~|~Replacing linked culvert. 88933~|~1~|~1~|~01/NHS~|~Resurfacing of ATB SR 11 from 13.94 to 21.16 88933~|~1~|~3~|~03/S<2~|~Resurfacing ATB SR 45 from 24.07 to 24.11. 107996~|~1~|~1~|~01/IMS~|~Construction Inspection 96651~|~1~|~1~|~01/STR~|~Plan Split for resurface and pavement repair on CLI-22 between SLM 12.57 - 17.71. Project will omit area over the cuvlert SLM 13.89. This location will be covered by future pid 85139. 105055~|~1~|~1~|~01/ENH~|~Construction of sidewalk and multi-use trail, and relocation of a section of multi-use trail within Pierce Township Park. 105389~|~1~|~2~|~02/S>2~|~Smooth seal on urban route: CLA US 40 SLM 5.21 to 5.29 105389~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CLA US 40 SLM 2.98 to 5.21 81716~|~1~|~2~|~02/NHS~|~ADA SR32 Rehab brdg 0100544 ADA SR32 23.4 Intersect: Scioto Brush Creek80/20 split 81716~|~1~|~1~|~01/NHS~|~ADA SR32 19.85 - 24.85 Resurfacing Project 118585~|~1~|~1~|~01/ERD~|~RAISE Grant 113396~|~1~|~2~|~02/STR~|~WAY SR 0241 01.32-Culvert Inlet Work. 113396~|~1~|~1~|~01/STR~|~The length of the project is WAY SR 0241 1.32 to 1.33 as this is a spot repair location. 116262~|~1~|~1~|~01/NFP~|~Resurfacing of W Park Dr from Old Furnace Rd to W Glacier Dr in Mill Creek Park. 103424~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 119226~|~1~|~1~|~01/STR~|~Resurfacing. 101091~|~1~|~1~|~01/S<2~|~Reconstruction of Washington Ave (US 22) from Columbus Ave to Elm St. excluding surface course and pavement marking. 101091~|~1~|~2~|~02/S<2/WCH~|~Resurfacing US 22 from Columbus Ave to Corp line (08.36 - 10.33) 101091~|~1~|~3~|~03/S<2~|~Resurfacing US 22 from 10.33 (WCH corp.) to SR 753 (10.47) 121990~|~1~|~1~|~01/ENH~|~ADA compliant pedestrian improvements utilizing Federal TAP and Safety funding up to the CAP. 101479~|~1~|~1~|~01/STR~|~DSR# BEL-023 118650~|~1~|~1~|~01/S>2~|~Add sidewalk and extend walking path on both ends, resurface path 110291~|~1~|~1~|~01/NHS~|~Slide repair BRO 52 3.63 97614~|~1~|~1~|~01/STR~|~Rockfall hazard remediation. WAS 821 5.20-5.28. GSM funds. Rural other federal aid funded 80 federal/20 state. 84289~|~1~|~2~|~02/NHS~|~Split for 100% local items not eligible for urban paving funds. 84289~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for urban paving funds 87031~|~1~|~1~|~01/SAF~|~District Wide contract to replace roadside delineators in FY2015 101089~|~1~|~1~|~01/NHS~|~17 bridges 105955~|~1~|~1~|~01/NFP~|~Improvements to SMART Center facility. 120689~|~1~|~1~|~01/STR~|~Resurfacing. 123779~|~1~|~1~|~01/NFA~|~No Fed Aid 116880~|~1~|~1~|~01/S>2~|~Resurfacing 103780~|~1~|~1~|~01/BRF~|~JAC CR 39 3.06 (SFN 4030214). 89268~|~1~|~2~|~02/NHS~|~80/20 funding split for work in the NHS section that is eligible for State STP funds: SLM 0.14 to SLM 0.77. 89268~|~1~|~1~|~01/S>2~|~80/20 funding split for wokr this is eligible for State STP funds: SLM 0.00 to SLM 0.14 and SLM 0.77 to SLM 1.68. 85959~|~1~|~1~|~01/STR~|~2 Lane Resurfacing - SLM 0.00 to 9.41 and minor structure work:PIC-159-0170PIC-159-0422PIC-159-0624PIC-159-0868 119275~|~1~|~1~|~01/NHS~|~Repair various bridges throughout District Six 113826~|~1~|~1~|~01/NFA~|~Split for SRTS safety work 105514~|~1~|~1~|~01/SAE~|~District wide signal contract 85161~|~1~|~1~|~01/S>2~|~Bridge Replacement, North Street CR10 2.08-2.09. 106338~|~1~|~1~|~01/SAF~|~CLI CR 12 7.712-8.317 realign both the horizontal and vertical curve as well as widen pavement and berms. 88969~|~1~|~1~|~01/STR~|~PIK SR 335 0.00-7.90SCI SR 335 8.41-11.27 88969~|~1~|~3~|~03/NFA~|~ODNR split to resurface headquarter lots at Pike State Forest and Scioto Trail State Forest. 88969~|~1~|~4~|~04/NFA~|~ODNR split to perform work at Ross Lake Wildlife area. 88969~|~1~|~2~|~02/S<2~|~PIK 104 12.04-12.66 88969~|~1~|~5~|~05/STR~|~PIK 335 5.80 (6602703)SCI 335 8.63 (7305044) 93463~|~1~|~1~|~01/BRF~|~Baldwin Rd bridge replacement over N Fork Paint CreekSFN 2431734, FAYTR121-0.20 95124~|~1~|~1~|~01/S>2~|~Reconstruction and widening to provide left turn lanes 95124~|~1~|~2~|~02/S>2~|~100% Local items for waterworks upgrades. 102703~|~1~|~2~|~02/ENH~|~Bridge Aesthetics 102703~|~1~|~1~|~01/NHS~|~Bridge Deck Replacement: LOR-83-10.78 (SFN 4708431) 80746~|~1~|~1~|~01/BRF/HIGH~|~3632342 HIG TR194 1.48 Intersect: Brush CreekPlan Split for brdg replacement. Non Fed Aid, 80/20 split local match Highland, 01/BRF/BR/HIGH 117490~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 196-0.71 SFN: 0541540 Federal/State Exchange program. 99940~|~1~|~1~|~01/NHS~|~Various bridges. 87204~|~1~|~1~|~01/STR~|~Resurfacing using rural STP funds. Funding from the District Preservation Program. 80% 4PF7 and 20% 4PS7. All work on US 127, SR 111 and SR 634. Work on SR 15 in Putnam County from the Defiance County line to the Ottawa-Glandorf Urban Area boundary at 16.33. 87204~|~1~|~3~|~03/NHS~|~Pavement repair using NHS funds. Funding from the District Preservation Program. 80% 4PF7 and 20% 4PS7. No local funds. Work on SR 15 from 17.80 to 17.94. 87204~|~1~|~2~|~02/S<2~|~Work using urban STP funds. Funding from the District Preservation Program Program. 80% 4PF7 and 20% 4PS7. No local funds. Work on SR 15 from the Ottawa-Glandorf Urban Area boundary at 16.33 to the Village of Ottawa corportation limits at 17.09. Work on SR 65 in the Village of Ottawa from 8.54 to 8.63. 111256~|~1~|~1~|~01/NFP~|~Resurfacing of the POR Triangle Lake Bog Nature Preserve. 115158~|~1~|~1~|~01/NFP~|~Microsurface MED SR 162 17.190 - 24.08 116300~|~1~|~1~|~01/S<2~|~Chip seal. 116300~|~1~|~2~|~02/STR~|~Chip Seal. 116300~|~3~|~3~|~03/NFP~|~Added plan split for HIG-131-0.00-7.08 section. 116300~|~3~|~4~|~04/NFA~|~Added plan split for added HIG-131 section. 122823~|~1~|~1~|~01/MPO~|~City of Harrison EV projects 2026 110702~|~1~|~1~|~01/STR~|~All funding from this plan split using district preservation allocations. 117016~|~1~|~1~|~01/CMQ/GPHC~|~Construction of shared use path connecting Winton Woods to Glenwood Gardens. 94489~|~1~|~1~|~01/S>2~|~The project will increase the vertical clearance between the Madison Road pavement and the bottom of the railroad bridge to 14'-3" from 12'-3". 109999~|~1~|~1~|~01/S<2~|~Urban Area (STP<200000) Plan Split 109999~|~1~|~2~|~02/STR~|~Rural Plan Split 88556~|~1~|~1~|~01/S>2/AKRN~|~Intersection re-alignment. Along with full depth pavement reconstruction and narrowing from four sub-standard lanes to three lanes. Includes curbs, sidewalks, and signals. From Dayton Street to State Route 8 in the City of Akron, Summit County, Ohio. 121670~|~1~|~1~|~01/NHS~|~Replace bridge over Treacle Creek 121670~|~2~|~2~|~02/STR~|~PE ENVIR 121670~|~3~|~3~|~03/STR~|~PE ENVIR 98615~|~1~|~1~|~01/NFA~|~Upgrading existing Ethan Drive to accommodate a roadway extension alleviating traffic congestion in downtown Streetsboro. 110648~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 45 from 0.00 to 2.84 and 12.49 to 15.24. 96141~|~1~|~1~|~01/NFA~|~Construct a new 60' x 120' heated storage building at the Montgomery County Full Service Facility. 105607~|~1~|~1~|~01/NHS~|~NHS Plan Split - DEL-36-12.81 to 12.83 and DEL-36-17.64 to 18.03. 105607~|~1~|~2~|~02/S<2~|~STP < 200000 Plan Split - MAR-95-17.19 to 18.31 105607~|~1~|~3~|~03/S>2~|~Stp>200,000 Plan Split - DEL-257-0.77 to 1.5. Also, DEL-36-7.26 to 7.43, 8.68 to 8.81 and 8.83 to 9.04. 87373~|~1~|~1~|~01/S>2~|~Replacement of sfn#7801955 (TRU-45-1.30) over Norfolk Southern Railroad 102818~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing BUT-126 between SLM 9.05-11.31 116163~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into roundabout 113901~|~1~|~1~|~01/NFA~|~Created for TID Involvement. 112542~|~1~|~1~|~01/IMS~|~plan split for the resurfacing work 104666~|~1~|~1~|~01/SAE~|~Federal funds from the District Preservation Program budget SAC 4PF7. Work to install traffic signal which is eligible for 100% federal funding. 106588~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Licking County Engineer project to replace bridge Lic-CR668-9.02 (SFN 4536320) 94903~|~1~|~2~|~02/IMS~|~I-675 94903~|~1~|~1~|~01/IMS~|~I-675 97992~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP 92993~|~1~|~3~|~03/S<2/MTVE~|~District Preservation Urban Paving 4PF7 (80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing on: 1) Kno-SR 229-07.17 to 07.28, 2) Kno-SR 229-08.48 to 09.53 92993~|~1~|~4~|~04/S<2/MTVE~|~Local Paving Costs 4BG7(100% Local) - No CAP - Locally Requested Items not Eligible for Urban Paving Funding on: 1) Kno-SR 229-07.17 to 07.28, 2) Kno-SR 229-08.48 to 09.53 92993~|~1~|~2~|~02/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Kno-SR 229-06.90 to 07.17 92993~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Kno-SR 229-00.00 to 06.90 123130~|~1~|~1~|~01/S5K~|~Chip Seal 123130~|~1~|~2~|~02/STR~|~Chip Seal 123130~|~1~|~3~|~03/NFA~|~Chip Seal 96818~|~1~|~1~|~01/NHS~|~Priority System resurfacing of HAS-22 from SLM 21.47 to SLM 25.23 including joint repairs and pavement markings. 99747~|~1~|~1~|~01/IMS~|~Project inspection 110139~|~1~|~1~|~01/STR~|~AC Overlay without Repairs 87945~|~1~|~1~|~01/IMS~|~90% fed/10% state funding split utilizing noise wall replacement program funding. 88633~|~1~|~1~|~01/NFA~|~Resurfacing from 0.00 to 4.84 102167~|~1~|~1~|~01/ENH~|~Walkway/bikeway 102167~|~1~|~2~|~02/ENH~|~monumental entrance sign gateway w/electrical and trees 92890~|~1~|~1~|~01/S<2~|~District Allocation 92890~|~1~|~2~|~02/S<2~|~Urban Paving - 80/20 - District Allocation/City of Wadsworth 92890~|~1~|~3~|~03/S<2~|~100% City of Wadsworth 101303~|~1~|~1~|~01/NFP~|~Bridge cleaning. 114432~|~1~|~1~|~01/STR~|~Culvert replacement. 99707~|~1~|~1~|~01/IMS~|~Repair collision damage to bridge CLE-275-1163. Repair will involve heat straightening, painting, and crossframe replacement. 118729~|~1~|~2~|~02/STR~|~Two-lane resurfacing project on WAS CR 79 3.14-5.654. Funded 100% local. 118729~|~1~|~1~|~01/MPO~|~Two-lane resurfacing project on WAS CR 79 0.00-3.14 and WAS CR 271 0.02-1.25. Funded 80% WWW MPO STP (4TA7) and 20% Local. 97536~|~1~|~1~|~01/IMS~|~Widening of IR-77 from four lanes to six lanes. Work limits are approximately Ghent Road to approximately IR-80 (Ohio Turnpike) in Summit County, Ohio. 107905~|~1~|~1~|~01/MPO~|~Roadway resurfacing including enhanced pavement markings and an 18" aggregated berm. 7466~|~1~|~1~|~01/MPO~|~Major widening 115627~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 5.67, SFN 3701115 and HOC 180 2.34, SFN 3702766. 110486~|~1~|~1~|~01/SAF~|~Safety funded plan split 87575~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation - No CAP - Location = 1600990 COS SR60 13.61 Intersect: Flint Run - - SFN 1600990 qualifies for replacement: Length - 23' - SD(1) - SR = 40.7 114729~|~1~|~1~|~01/NHS~|~Overlay on JAC 35 114729~|~1~|~2~|~02/NHS~|~Bridge PM 91949~|~1~|~2~|~02/NFP~|~Upgrade of signal cabinets at several locations 91949~|~1~|~1~|~01/NFP~|~100% 4CP7/Maintenance Funds for 1 year 115027~|~1~|~1~|~01/NFP~|~Signal improvements along Pemberville Road 120421~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT 102791~|~1~|~1~|~01/IMS~|~VGCS main span LED replacement 110158~|~1~|~1~|~01/NFP~|~Metropark funds plan split 102392~|~1~|~1~|~01/NFP~|~Resurfacing POR US 224 from 13.51 to 18.67 and POR US 224D from 0.00 to 0.08. 102392~|~1~|~2~|~02/SAE~|~Adding Rumble Stripes. 102392~|~1~|~3~|~03/NFP~|~Minor bridge work > 20' span. 102392~|~1~|~4~|~04/NFP~|~Culvert headwall repair. 95110~|~1~|~1~|~01/ENH~|~The project will construct pedestrian facilities that access McDonald City School properties throughout the Village of McDonald, Trumbull County, Ohio. 103469~|~1~|~1~|~01/NFA~|~The TID is constructing the Bethesda Drive Extension Project including, but not limited to, roadwork improvements by extending the Bethesda Drive. 83820~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 144 4.57-14.61. Rural other federal aid funded 80 federal/20 state. 82924~|~1~|~3~|~03/STR/Sani~|~Plan Split to cover the relocation of sanitary line. 82924~|~1~|~1~|~01/STR~|~Resurfacing on SR-44 and SR-171, and replacement of culverts at STA-SR44-4.83, STA-SR44-4.97, Sandy Township and Osnaburg Township, Stark County, Ohio. 82924~|~1~|~2~|~02/STR~|~Minor structure work to SFN# 7601514, STA-SR44-4.26 over the Little Sandy Creek and SFN# 7601573, STA-SR44-6.85 over the Little Sandy Creek in Osnaburg Township, Stark County, Ohio. Structure work on STA-SR171-0.32 (SFN# 7605420) in the Village of Waynesburg, Stark County, Ohio. 105383~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: AUG SR 197 SLM 5.16 to 7.44 & AUG SR 362 SLM 0.00 to 0.78 105383~|~1~|~2~|~02/S<2~|~Smooth seal on small urban route: AUG SR 364 SLM 13.55 to 15.12 105383~|~1~|~3~|~03/NFA~|~Smooth seal on Non-Federal Aid Route: AUG SR 720 SLM 0.00 to 2.81 108482~|~1~|~1~|~01/SAF~|~Plan split for TSMO pavement work 108482~|~1~|~2~|~02/SAF~|~Plan split for TSMO bridge work 115420~|~1~|~1~|~01/IMS~|~Culvert replacement project. WAS 77 9.58, CFN 1810412. 115933~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 151 over George's Run. 22131~|~1~|~2~|~02/NHS~|~Split for painting the Lorain Rd bridge 22131~|~1~|~1~|~01/IMS~|~Funding split for all work on the interstate. 111121~|~1~|~1~|~01/MPO~|~Reconstruction of Lewis Ave. from Laskey to Shantee Creek 111121~|~1~|~2~|~02/MPO~|~Resurfacing of Lewis from Shantee Creek to Alexis Rd. 121022~|~1~|~1~|~01/NHS~|~Plan split to program project, updated when scope is complete. 102492~|~1~|~1~|~01/NFP~|~District Maintenance and Preservation Funding - 4CP7 / 4PS7 (100% State) - See CAP Comments - Plan Split for Guardrail upgrade on various district routes 100824~|~1~|~1~|~01/S>2~|~Convert the existing five lane arterial section of US-62 between State Route 43 and the Nimishillen Creek/Railroad underpass which includes numerous at-grade intersections and driveways to a four lane divided limited access section approximately one mile in length, while the existing US-62 Eastbound lanes would be utilized as a frontage road for the properties on the South side of the freeway. In Plain Township, Stark County, Ohio. 100824~|~1~|~2~|~02/S>2/CANT~|~Construction of waterline along US-62 frontage road. Funded 100% Local. 100824~|~1~|~3~|~03/S>2~|~New culverts along new US 62 alignment. 100824~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 122054~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 113551~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads. 107366~|~1~|~1~|~01/NFP~|~Construct material storage. 94391~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: ASD 604 0.00-3.38.. 84884~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - County Engineer's Association Funding 4B87(80% Federal) / LNTP (15% Federal Credit Bridge) / LNTP(5% Local) - CAP=Total of $2.5 Million minus $140,000.00 for ROW = $2,360,000.00 for Construction ? Replacement of SFN 453685 LIC CR 39 02.20 York Road Intersect: South Fork of the Licking River BR Eligible for Replacement: Length=87? SD/FO(1) SR=18.2 DSR=6 107511~|~1~|~1~|~01/STR~|~Resurfacing HOL-514 90692~|~1~|~1~|~01/MPO~|~construct bioswale and infratstructure to improve pedestrian and drainage system on Reynolds Rd 24839~|~1~|~1~|~01/STR~|~District Allocation 101322~|~1~|~1~|~01/STR~|~Chip seal MAD-323-0.28-18.66 and UNI-739-11.73-14.13 89947~|~1~|~1~|~01/STR~|~Resurfacing / Mill and Fill 109266~|~1~|~1~|~01/NFP~|~Districtwide fence repairs and replacement. 81239~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7 (100% State) - Contract for placement every three years of Thermoplastic Striping within District 5 on IR; US; and SR 120248~|~1~|~1~|~01/SAF~|~SRTS Funding for crossing improvements in Norwalk 105094~|~1~|~1~|~01/STR~|~01/STR/PV/ -Plan Split 1 97954~|~1~|~1~|~01/STR~|~SR 245 SLM 10.81 to 20.02 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in). 100641~|~1~|~2~|~02/NFA~|~Resurfacing SR 179 from SR 3 to ASD Co. Line 100641~|~1~|~3~|~03/STR~|~Asphalt resurfacing of WAY-226 100641~|~1~|~1~|~01/STR~|~Resurfacing SR 83, SR 179 from SR 226 to SR 3 and SR 226 from SR 179 to SR 514 105326~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on rural route: MIA SR 55 SLM 16.30 to 21.34 CHP SR 55 0.00 to 0.23. 98128~|~1~|~1~|~01/NHS~|~Landslide Remediation on U.S. 22. 107163~|~1~|~1~|~01/NHS~|~Bridge due to accident. 119825~|~1~|~1~|~01/S>2~|~Resurfacing work on Zollinger Road 88796~|~1~|~1~|~01/STR~|~Replace deteriorating bridge with minimal approach work on SFN 1201417 CLA US 40 26.03 Beaver Creek. 91164~|~1~|~1~|~01/MPO~|~LAW SR7 3.04 OH11-02On SR7, begin project 2.3 miles north of its intersection with SR527. . MPO area80/20 split 01/MPO/OT/State 103798~|~1~|~1~|~01/SAF~|~Safety Plan Split 109937~|~2~|~2~|~02/NFP/GRAN~|~100% Local Plan split for Federally Ineligible items 109937~|~1~|~1~|~01/SAF/GRAN~|~"01/SAF/OT/GRAN" - TAP 80% Carbon Reduction (4CT7)/20% Safety (4HJ7) and LCATS 80% Federal (4TB7)/20% Local (4BG7) - funded improvement of three traffic signals and mid-block crossing within village of Granville. 106231~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. DSR TUS-001 119144~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 19.11-28.74. 119144~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 19.11-28.74. New Pavement. 119144~|~1~|~3~|~03/NHS~|~Construction of 3 new structures as companion bridges on MEG US 33 19.11-28.74. 114628~|~1~|~1~|~01/STR~|~Overlay on ROS 772. 114628~|~1~|~2~|~02/NFA~|~Overlay project. 114628~|~1~|~3~|~03/S5K~|~Added plan split. 114628~|~1~|~4~|~04/NHS~|~added NHS bridge plan split. 114628~|~1~|~5~|~05/S5K~|~added STP plan split. 121915~|~1~|~1~|~01/SAF/CANT~|~Pedestrian enhancements. 109604~|~1~|~1~|~01/NFA~|~Landslide repair. MRG 376 14.92. Funded 100% state. 109983~|~1~|~1~|~01/NFP~|~D09 GR End Assembly Repair 101316~|~1~|~1~|~01/NHS~|~Microsurfacing and double microsurfacing on NHS routes:FRA-317-0.00 to 5.45MAR-95-17.19 to 18.31MAR-23-2.41 to 10.62 101316~|~1~|~2~|~02/STR~|~Microsurfacing on Rural STP route:DEL-605-0.00 to 6.21 103014~|~1~|~1~|~01/NHS~|~See linked structures. 106390~|~1~|~1~|~01/NHS~|~Widening of Morse Rd 106390~|~1~|~2~|~02/IMS~|~SB 270 Exit Ramp 106390~|~1~|~3~|~03/NHS~|~L-Brands/Morse Rd. 100% Local improvements 108013~|~1~|~1~|~01/NHS~|~Lighting 97275~|~1~|~1~|~01/STR~|~District wide herbicidal spray project 94804~|~1~|~1~|~01/S<2~|~Pulverize existing road and remove excess crown and make ADA improvements. SLM 0.00 to 0.80 99592~|~1~|~1~|~01/NFA~|~Rehabilitate the Urbana Line From M.P. 124 to M.P. 119 and replace approximately 1,0000 cross ties per mile. Rail improvements would be included where needed. 99592~|~1~|~2~|~02/NFP~|~Rehabilitate the Urbana Line from MP 124 to MP 119 and replace approximately 1,000 cross ties per mile. Rail improvements would be included where needed. 105350~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 9: Demolition of the existing WHV. 106299~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4. 107960~|~1~|~1~|~01/IMS~|~plan split for longitudinal joint repairs on BUT-75 110332~|~1~|~1~|~01/MPO~|~Reconstruction including reconfiguration of existing concrete medians,installation of a 5' sidewalk on the north side and a 1 O' shared use path on the south side of the roadway, and replacement of the existing corrugated, metal arch culverts at the western project limits and the intersection of Riverside Drive and Shoup Mill Road. 109400~|~1~|~1~|~01/SAF~|~District wide fast drying pavement markers. 96216~|~1~|~1~|~01/NFP~|~Environmental remediation of Portage County garage in Rootstown, Ohio. 93552~|~1~|~1~|~01/SAE~|~SRTS project 100923~|~1~|~1~|~01/S<2~|~This plan split is for the small urban routes. 100923~|~1~|~2~|~02/STR~|~This plan split is for the rural routes. 100923~|~1~|~3~|~03/S>2~|~This plan split is for the large urban route. 103668~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 18.29. DSR MEG-002. 84530~|~1~|~1~|~01/NHS~|~Bridge Work on NHS Routes for the following bridges: CLE-125-1347, CLE-32-1425L, CLE-32-1425R, CLE-32-1214, CLE-32-1314L, GRE-35-2297, and HAM-562-0227. This plan split also includes incidnetal roadway work relative to these bridge locations. 84530~|~1~|~3~|~03/NFP~|~Split includes work related to Bridge CLE-743-0466. 84530~|~1~|~2~|~02/S>2~|~Includes work related to bridge CLE-132-1425 and WAR-123-1740. 84530~|~1~|~4~|~04/STR~|~Plan split includes work assoiacted with bridges PRE-127-1716, PRE-177-0486, and WAR-123-0598. 106961~|~1~|~1~|~01/NFA~|~Construct Sunbury Parkway from US 36 to 3 B's & K Rd and widen Sunbury Parkway between 3 B's &K Rd to W of IR 71 102844~|~1~|~1~|~01/NFA~|~D09 Guardrail FY22 110937~|~1~|~1~|~01/STR~|~Culvert Replacement by Jack & Bore or Open Cut. 123612~|~1~|~1~|~01/STR~|~Plan split for STP Rural 105143~|~1~|~1~|~01/IMS~|~"01/IMS/BR " - District Preservation - No CAP - 90% Federal (4PF7)/10% State (4PS7). Work to include deck overlay and concrete patching. 111483~|~1~|~1~|~01/NFP~|~Resurfacing of E Newport Dr and Valley Drive in Mill Creek Park. 119981~|~1~|~1~|~01/MPO/BEAV~|~MVRPC carbon reduction funded lighting project in and around the city of Beavercreek. 95932~|~1~|~1~|~01/NFA~|~Mill and repave several sections of the Great Miami River Recreation Trail that are currently in poor condition 102454~|~1~|~1~|~01/STR~|~Spot Paving on various routes in District 11 101102~|~1~|~1~|~01/STR~|~AC Overlay without repairs on:AUG-119 SLM 5.92 to 7.19SHE-119 SLM 0.00 to 2.19SHE-274 SLM 6.21 to 8.97 101102~|~1~|~2~|~02/S<2~|~AC Overlay without repairs on:AUG-119 SLM 5.78 to 5.92 99643~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state 114160~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2027. 116376~|~1~|~1~|~01/NFA~|~Created for Plan Split J&C involvement 106544~|~1~|~1~|~01/BRF~|~ROS CR 222 3.83 (SFN 7146116) 106544~|~1~|~2~|~02/SAF~|~Intersection Improvement. 21788~|~1~|~1~|~01/IMS~|~Funding split for all work on the CSX structure 93024~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Kno-SR 13-16.00 to 20.74 97013~|~1~|~1~|~01/STR~|~from SLM 0.00 to SLM 4.05 108888~|~1~|~1~|~01/NHS~|~Urban Paving Program in the City of Oakwood. SR48 SLM 8.66 to 10.87 105799~|~1~|~1~|~01/CMQ~|~CMAQ funded signal system upgrade 105799~|~2~|~2~|~02/S>2~|~100% City of Delaware funded signal upgrade 104097~|~1~|~1~|~01/BRO~|~Split for funding the bridge replacement 124912~|~1~|~1~|~01/STR~|~Culvert erosion repair. 113003~|~1~|~1~|~01/S<2~|~Overlay of SR 335. Local Match 113003~|~1~|~2~|~02/S<2~|~Overlay on SCI 335 114095~|~1~|~1~|~01/NFA~|~Created for J&C involvement 96133~|~1~|~1~|~01/NFA~|~Construct a new 40' x 120' storage building at the ODOT Auglaize County Full Service Facility. 110113~|~1~|~1~|~01/IMS~|~Plan split for work in IMS locations. 110113~|~1~|~2~|~02/S5K~|~Plan split for work in Sm Urban locations. 110113~|~1~|~3~|~03/STR~|~Plan split for work in rural locations. 109809~|~1~|~1~|~01/STR~|~Resurfacing on SR 613 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). 116095~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in ATB, MAH and TRU counties. 109745~|~1~|~3~|~03/STR~|~Plan Split 03/STR/BR/ - District Bridge Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP 109745~|~1~|~1~|~01/STR~|~01/STR/PV/ : Plan Split 1 for Lic-37-25.08-25.84, Fai-37-0.00-6.81, and Fai-37-6.480-9.693 109745~|~1~|~2~|~02/S<2~|~02/S<2/PV/ : Plan Split 2 for Fai-37-9.693 to 12.887 122407~|~1~|~1~|~01/SAF~|~All items of work associated with the installation of sign trusses on US23. 122407~|~1~|~2~|~02/SAF~|~All items of work associated with the installation of sign trusses on IR-70. 122407~|~1~|~3~|~03/SAF~|~All items of work associated with the installation of sign truss on the US33 ramp at I-270. 93594~|~1~|~1~|~01/IMS~|~Pavement from SLM 1.10 to SLM 2.75 93594~|~1~|~2~|~02/IMS~|~Major Bridge over Colligwoo/Swan Creek/AWT 93594~|~2~|~3~|~03/NHS/Tole~|~Reconstruct SR-25 (AWT) from City Park to Collingwood. Funded 100% local. Part 2 93594~|~1~|~4~|~04/IMS~|~District funded plans split for Emergency Change order. 93594~|~1~|~5~|~05/NFP~|~100% City of Toledo funded Items 93594~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 99556~|~1~|~1~|~01/BRO~|~Change Order for Block PID 102645~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a double microsurfacing treatment. ATH 33 4.70-11.07, MEG 33 4.26-9.62 and WAS 7 14.05-17.60. NHS route funded 80 federal/20 state. 114480~|~1~|~1~|~01/STR~|~Guardrail maintenance, repair and replacement throughout District 11 103287~|~1~|~1~|~01/NFA~|~The county is constructing road improvements to support ElectroCraft, specifically adding a crosswalk safety improvement consisting the installation of a programmable solar powered beacon system crosswalk lights, enhanced pedestrian crosswalk signage and the restriping of the existing crosswalk on Bob McCormick Road. 98581~|~1~|~1~|~01/BRF/MCEO~|~County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-CR5-3.68 - SFN 6032028 - BR Eligible for replacement: L=31'; SD/FO=1; SR=48.0; DSR=5; over Little Salt Creek; 98581~|~2~|~2~|~02/BRF/MCEO~|~County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-TR136-0.73 - SFN 6034659 - BR Eligible for replacement: L=28'; SD/FO=1; SR=52.0; DSR=7; over Blue Rock Creek Tributary 101027~|~1~|~1~|~01/SAF~|~District wide maintenance contract for highway lighting in D8 for FY2022/FY2023. 101027~|~1~|~2~|~02/SAF~|~District wide maintenance contract for highway lighting in D7 for FY2022/FY2023. 101027~|~1~|~3~|~03/SAF~|~MOT 70 sign truss foundation and installation 119748~|~1~|~1~|~01/SAF~|~Guardrail improvements on various county maintained routes in PRE county. 92329~|~1~|~1~|~01/NHS~|~Bridge painting project with beam end repairs. ATH 33 12.44 L&R (SFN 0500720, 0500755) ATH 33 16.31 L&R (SFN 0500852, 0500860) ATH 33 17.60 L&R (SFN 0500941, 0501018) NHS, Federal 80% and State 20%. 122160~|~1~|~1~|~01/S5K~|~Repair/stabilization along SR 56 116582~|~1~|~1~|~01/NHS~|~Replace culvert type bridge carrying SR 7 over Narrows Run. 124230~|~1~|~1~|~01/NHS~|~Crack and Seat Work 98279~|~1~|~1~|~01/NHS/NEWA~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP -Rehabilitation of SFN 4504941 84554~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. WAS 530 0.00-7.86. Non-Federal Aid route, 100% State funded. 89291~|~1~|~2~|~02/S>2~|~Repair of an existing landslide located along SR-131 approximately 0.1 miles east of US-50, programmed under ODOT sponsored PID 81197, has been included in this project. 89291~|~1~|~1~|~01/MPO~|~Project involves the widening of SR-131 north of US-50 to extend the storage capacity of the existing right turn lane, provide proper through-lane geometric alignment, and provide a lengthened northbound receiving lane to accomodate the dual-left turn movement from US-50 EB onto SR-131 NB and eliminate the short merge to one through-lane that currently exists. 91067~|~1~|~1~|~01/MPO~|~LAW Union Rome Trails & Walkways Phase 1. Proposed is the construction of a comprehensive trail system throughout the Union and Rome Township areas of Lawrence County, inclusive of the Village of Chesapeake and Proctorville, along with interconnections with other Tri-State Trail Systems. The trails would be utilized to accommodate pedestrian, bi-cycles, motored wheelchairs and other like equipment off the current corridor streets and busy roadways. The project is anticipated to be built in multiple phases, all targeted to interconnect to the Eastern Campus of Ohio University which would also serve as an interconnecting point of a proposed Park and Ride and Public Transportation facility. 80% KYOVA 20 Local Match (Ironton) 01/MPO/OT/Ironton 95935~|~1~|~1~|~01/STR~|~"01/STR/PV/ " Plan Split for Gue-265-(0.00-17.63); Gue-821-(0.00-0.47) & (0.60-4.97); Nob-265-(0.00-0.32) 120087~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 93464~|~1~|~1~|~01/STR~|~Remove existing asphalt wearing surface and overlay with Micro Silica modified concrete on: SFN 0602612 AUG 119 0616 over Minster Creek SFN 5403340 MER 219 1380 over Beaver Creek SFN 7502788 SHE 119 0286 over Loramie Reservoir 96925~|~1~|~1~|~01/NFP~|~Added plan split due to funding 89052~|~1~|~1~|~01/S<2~|~Widen the existing roadway to three 12' lanes, including a dedicated two way left turn lane, curb lawn and sidewalks will be added on each side of the street and the signal at Russel Road/Wapak Avenue will be modified/upgraded as needed on Wapak Avenue from the JCT of Russel Road to West Parkwood. New storm sewer piping, catch basins, manholes, underdrains, and water main replacement will be done with Local funds. 94239~|~1~|~1~|~01/IMS~|~District Wide Crack Sealing project on the Priority System for FY2022. Routes to be determined. (approx 100 lane miles) Routes to be determined. 119406~|~1~|~1~|~01/NFP~|~Plan Split for Ohio Parks and Recreation Association (OPRA) funds. 100696~|~1~|~1~|~01/STR~|~Crack sealing on rural routes. 100696~|~1~|~2~|~02/S>2~|~Crack sealing on large urban routes. 100696~|~1~|~3~|~03/NHS~|~Crack sealing on NHS routes. 121733~|~1~|~1~|~01/SAF/TWIN~|~Crosswalk upgrades. 103717~|~1~|~1~|~01/S<2~|~Pavement 80/20 Fed/City OntarioSLM 6.40 to 8.73 103717~|~1~|~3~|~03/S<2~|~Pavement 80/20 Fed/City MansfieldSLM 8.73 to 9.30 103717~|~1~|~2~|~02/S<2~|~Pavement Repairs 90% 4TA7, 10% City of Ontario SLM 6.40 to 8.73 103717~|~1~|~4~|~04/S<2~|~Pavement Repairs 90% 4TA7, 10% City of Mansfield SLM 8.73 to 9.30. 103717~|~1~|~5~|~05/NHS~|~RIC SR 309 08.860 SFN 7001894 OVER RIC-30 103717~|~1~|~6~|~06/S<2~|~100% City of Ontario Items Urbanized Area Inside Corp. Limit (Items Such as Guard Rail, curb removed, curb, etc.): RIC-309-6.40 to 8.73 103717~|~1~|~7~|~07/S<2~|~100% City of Mansfield Items : Urbanized Area Inside Corp. Limit (Items Such as Guard Rail, curb removed, curb, etc.): RIC-309-8.73 (Ontario Corp) to 9.30 (end at US30) 103717~|~1~|~8~|~08/S<2~|~Alternate Bid Item Pavement Markings. 96355~|~1~|~1~|~01/SAF~|~SR-199 & Roachton intersection 103409~|~1~|~1~|~01/STR~|~Landslide repair. NOB 145 2.50. Work length approximately 350 ft. DSR NOB-001. 121140~|~1~|~1~|~01/STR~|~Resurfacing SR 39 123239~|~1~|~1~|~01/S5K~|~Resurfacing 112668~|~2~|~2~|~02/SAF~|~Signal Replacement and backplates at SR-7 and SR-164 intersection. 112668~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 7 from 0.00 to 3.58. 106881~|~1~|~1~|~01/BRF~|~Federal eligible bridge replacement 98913~|~1~|~1~|~01/STR~|~Pike County FLAP project. CR 84 1.72-3.93 119471~|~1~|~1~|~01/BRF/CONN~|~Bridge replacement. 101735~|~1~|~1~|~01/SAF~|~Install new guardrail along MRG CR 2, 39, 47, and 56. Work includes posts and railing. Funded 100% federal. 103270~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 118764~|~1~|~1~|~01/STR~|~Microsurfacing General system Routes Through District 96786~|~1~|~1~|~01/STR~|~Minor Rehab of COL-46 from SLM 1.37 to 4.09. 96786~|~1~|~2~|~02/S<2~|~Minor Rehab of COL-46 from 4.09 to 6.82. 112486~|~1~|~1~|~01/STR~|~AC Overlay with repairs 110380~|~1~|~1~|~01/NHS~|~Improvements to the intersection of US 23 at Rathmell Rd 84481~|~1~|~1~|~01/NHS~|~This is for pavement work on NHS route. 84481~|~1~|~2~|~02/NHS~|~This plan split is for NHS bridge work. 84481~|~3~|~3~|~03/NHS~|~Replace storm 24" storm pipe from Mt Healthy corp line to bridge. 84481~|~1~|~4~|~04/NHS~|~Type A guardrail installation 100660~|~1~|~1~|~01/STR~|~plan split for the roadway work in the Rural sections 95847~|~1~|~1~|~01/S<2~|~Concrete base pavement repair; asphalt resurfacing; 10' wide sidewalk construction, on East Stroop Road from Shroyer Road to East Dorothy Lane. 122871~|~1~|~1~|~01/NFP~|~All work included in this plan split. 119400~|~1~|~1~|~01/S>2~|~Roadway reconstruction, safety improvements, bicycle and pedestrian enchancements 120583~|~1~|~1~|~01/BRF~|~Muni-Bridge funding for bridge replacement 115896~|~1~|~1~|~01/NFP~|~Split for non-federal bridge rehabilitation and replacement 77801~|~1~|~1~|~01/IMS~|~HAN IR75 18.3-25.24 WOO IR75 0-19.92 116753~|~1~|~1~|~01/STR~|~Storm sewer plan split for storm sewer replacement on MAR-95-5.80 96228~|~1~|~1~|~01/NHS~|~Urban Paving NHS. SLM 5.68-10.51; 10.65-10.72 96228~|~1~|~3~|~03/S>2~|~2500590 FRA-23-7.96 Deck Overlay Non-BR eligible 96228~|~1~|~2~|~02/S>2~|~STP Urban Paving. SLM 10.51-10.65 118994~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work. 109631~|~1~|~1~|~01/STR~|~Emergency Repair on BRO 41 2.09. 93432~|~1~|~1~|~01/CMQ~|~Signal coordination. Including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. From East Market Street to Eastwood Avenue, in the City of Akron. 93432~|~1~|~2~|~02/NFP/akrn~|~In-eligible signal items. 104259~|~1~|~1~|~01/NFP~|~MOWING 91870~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 91870~|~1~|~1~|~01/IMS~|~Resurfacing. 95855~|~1~|~1~|~01/NFP~|~Culvert @ SLM 5.26 117642~|~1~|~1~|~01/BRF/GCEO~|~Replacement of the superstructure of Bridge PRE-TR 120-0.79 (SFN: 2932717). 94504~|~1~|~1~|~01/NFP~|~This is the district's FY17 district wide lighting maintenance construction contract using 4CP7 sac code. 98406~|~1~|~2~|~02/NHS~|~ERI-101-6.13 to 7.61 Resurfacing 98406~|~1~|~1~|~01/S<2~|~ERI-101-3.87-6.13 Resurfacing 98406~|~1~|~3~|~03/STR~|~Bridge work to be determined later. 98406~|~1~|~4~|~04/STR~|~BRIDGE WORK TO BE DETERMINED LATER. 100653~|~1~|~1~|~01/STR~|~Crack sealing various routes throughout District 11. 98533~|~1~|~1~|~01/IMS~|~funding split for all costs associated with painting bridges HAM-126-1373L/R and HAM-129-1434. 98533~|~1~|~2~|~02/NHS~|~This plan split is for bridge repair on NHS route bridge (Bridge HAM-126-1373N over Anthony Wayne and HAM-126-1406 over Mill Creek) 81565~|~1~|~1~|~01/BRF~|~Bridge replacement project. ATH CR 28 0.14, SFN 0544272. Federal/State 95/5% using Credit Bridge. 93446~|~1~|~2~|~02/IMS~|~Plan split to cover repairs to MSE Wall supporting IR 71. 93446~|~1~|~1~|~01/IMS~|~Repair of existing noise walls on FRA-71 at 5th Ave. One wall is 5th Ave to 71 SB, One wall is 5th Ave to 670 WB. 92027~|~1~|~1~|~01/BRO~|~80/20 fund split for bridge work using federal BHF funds. 121889~|~1~|~1~|~01/MPO/RICH~|~Resurfacing 115506~|~1~|~1~|~01/S>2~|~Split for urban paving work 104838~|~1~|~1~|~01/NFP~|~Split for pavement marking on the state highway system. 84090~|~1~|~1~|~01/ENH~|~Install sidewalks, street lighting, decorative pedestian lighting and improved pedestrian crossings on Stroop Road from Shroer Road to JCT of Southmoor Circle in the City of Kettering. 108551~|~1~|~1~|~01/MPO~|~Lighting project along SR 183 in the city of Alliance. 108551~|~1~|~2~|~02/ENH~|~Lighting project along SR 183 in the city of Alliance. 88312~|~1~|~1~|~01/NFA~|~Guardrail placement/re-placement project on CR 2, 6 and 70. CEAO approved using HSIP. 100% Federal. 94237~|~1~|~1~|~01/STR~|~This is for crack sealing on rural routes. 94237~|~1~|~2~|~02/NHS~|~This is for crack sealing on NHS routes. 94237~|~1~|~3~|~03/S<2~|~This is for crack sealing on Small urban routes. 94237~|~1~|~4~|~04/S>2~|~This is for crack sealing on Large urban routes. 105400~|~1~|~1~|~01/STR~|~Bridge rehab of rural route bridge. 123558~|~1~|~1~|~01/IMS~|~Plan Split for preventive maintenance work on bridges located on the interstate system 123558~|~1~|~2~|~02/NHS~|~Plan Split for preventive maintenance work on bridges located on the NHS system 123558~|~1~|~3~|~03/S>2~|~Plan Split for preventive maintenance work on a bridge located on the STP Urban 123558~|~1~|~4~|~04/STR~|~Plan Split for preventive maintenance work on a bridge located on the STP Rural system 97460~|~1~|~1~|~01/NFP~|~This is the district's annual auxiliary pavement marking project. 111977~|~1~|~1~|~01/STR~|~AC Overlay without repairs on:CLA-41 SLM 31.26 to 33.38CLA-235 SLM 6.16 to 8.75 108085~|~1~|~1~|~01/STR~|~Plan Split for RPM's 111352~|~1~|~1~|~01/NFP~|~Resurfacing of the Boat Ramp Parking Lot (Reisinger Rd) in the East Fork Wildlife area. 118763~|~1~|~1~|~01/STR~|~added plan split. 88668~|~1~|~1~|~01/NHS~|~PLan Split for the NHS routes int the project. This route is WAR-122 88668~|~1~|~2~|~02/S>2~|~Plan split for the route in the large urban area. This route is WAR-63 88668~|~1~|~3~|~03/S<2~|~Plan Split for the small urban area. This route is PRE-121 88668~|~1~|~4~|~04/STR~|~Plan Split for the routes inthe rural areas. These routes are BUT-128, HAm-128, PRE-122, PRE-725, and PRE-732 88668~|~1~|~5~|~05/NFP~|~Plan split for the route not on the Federal Aid system 122971~|~1~|~1~|~01/MPO~|~80/20 ODOT/Local split, OKI STBG funding for Great Parks Oasis Trail 88811~|~1~|~5~|~05/STR~|~Bridge Work - SFN 0305553 (ASD-511-15.97), SFN 0305561 (ASD-511-17.15), SFN 0305618 (ASD-511-18.54), SFN 0305642 (ASD-511-19.57), and SFN 0305715 (ASD-511-25.84) 88811~|~1~|~1~|~01/S<2~|~100% City of Ashland: includes pavement repairs, curb, curb ramps, sidewalk, city owned signs, guardrail - replacement and new locations within ASD 511 14.07 - 14.53. 88811~|~1~|~3~|~03/S<2~|~District Allocation: ASD 511 14.53 - 15.28 88811~|~1~|~2~|~02/STR~|~District Allocation; ASD 511 15.28 - 18.00, ASD 511 18.33 - 27.64, and ASD 302 10.84 - 11.22 88811~|~1~|~4~|~04/S<2~|~Urban Paving - 80/20 - District Allocation/City of Ashland; ASD 511 14.07 - 14.53 93702~|~1~|~1~|~01/S>2~|~80/20 split between federal and local for the resurfacing of Kirtland Road using MPO STP funds. 93702~|~1~|~2~|~02/NFP~|~Work items not eligible for federal-aid 104438~|~1~|~1~|~01/MPO~|~plan split 108048~|~1~|~1~|~01/STR~|~Maintenance funds to replace UPS batteries, relamp signal heads, and replace signal heads 110441~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - OFAH Rural for KNO 586 0.00 to 3.28 & 3.41 to 11.37 110441~|~1~|~2~|~02/S5K~|~Plan Split 02/S5K/PV/ - OFAH Urban for KNO-586-11.37 to 12.92 110441~|~1~|~3~|~03/S5K/MTVR~|~Plan Split 03/S5K/PV/MTVR for KNO-586-12.92 to 13.98 93028~|~1~|~1~|~01/IMS~|~Painting of Five Interstate Bridges:7702760 CATAWBA AVEN - 10.207702825 COLE AVENUE - 11.287702914 LOVERS LANE - 11.507702949 LAFOLLETTE AVE. - 11.847711220 SR 764 - 02.14 98929~|~1~|~1~|~01/S<2~|~SR-25 and SR-64 119996~|~1~|~1~|~01/NFP~|~Plan split for ITS maintenance 119083~|~1~|~1~|~01/NHS~|~Plan split for project to Replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. 119355~|~1~|~1~|~01/BRF~|~CEAO LBR - BFP funded at 100% 99390~|~1~|~3~|~03/NFA~|~Culvert replacement project. MOE 255 7.33 and 8.65.. Not on any federal aid system funded 100% state. 99390~|~1~|~2~|~02/NHS~|~Culvert replacement project. MOE 7 6.59, 15.86, and 23.97. NHS route funded 80 federal/20 state. 99390~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations: MOE 26 3.78, 16.21; MOE 78 3.29, 13.49; MOE 145 17.03, 23.80; MOE 800 21.01; WAS 26 16.23, 26.36; WAS 339 1.76, 4.09, 10.57, 14.73. Rural other federal aid funded 80 federal/20 state. 99390~|~1~|~4~|~04/STR~|~100% State split added for extra work on utility sub-phase. 122848~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing. 88840~|~1~|~1~|~01/S<2~|~This is for work outside the City of Lima but inside the Lima Urbanized Area but not on the NHS. All funding is from the District Preservation Program budget 80% SAC 4PF7 and 20% SAC 4PS7. There are no City of Lima funds in this split. It is for SR 117 from 12.73 to 13.06 and from the SR 117/SR 309 intersection at 18.75 to end of the project at 19.14. 88840~|~1~|~2~|~02/NHS/LIMA~|~This is for resurfacing work inside the City of Lima on the NHS. The City of Lima will provide the 20% non-federal match. The 80% federal funds are from the District Preservation Program budget SAC 4PF7. All resurfacing on SR 65 and SR 81 is in this split. It is also for resurfacing on SR 117 from 14.06 to 14.43 on the left side of the road, on both sides of the road from 14.43 to 14.47 on the left side of the road from 14.47 to 14.87 and 14.87 to 15.34 on both sides of the road. Resurfacing on SR 309 from the corporation limits at 11.17 to 11.80 is also in this split. 88840~|~1~|~4~|~04/NHS~|~This is for work outside the City of Lima but inside the Lima Urbanized Area and on the NHS. All funding is from the District Preservation Porgram budget 80% SAC 4PF7 and 20% SAC 4PS7. There are no City of Lima fudns in this split. It is for SR 117 from 13.06 to 14.06 on both sides of the road, from 14.06 to 14.43 on the right side of the road and from 14.47 to 14.87 on the right side of the road. This split is also for work on SR 309 from 10.98 to the City of Lima corporation limits at 11.17 88840~|~1~|~3~|~03/NFP/LIMA~|~Curb ramps, full and partial depth repair and aux. pavement markings in the City of Lima. The first $35,000 will be state funds from the District Preservation Program budget SAC 4PS7. These funds are to compensate for damages to local streets from damage casued by the ALL-75 project haul routes. After the first $35,000 all funds will be provided by the City of Lima. 98635~|~1~|~1~|~01/NHS~|~SFN 4600363, LOG-33-1069 - remove structure and fill in with embankment material and new roadway section. Railroad is no longer there; therefore, bridge is no longer needed. DO NOT REPLACE BRIDGE. 118719~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 50 24.23-30.66. 121297~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2030. 113186~|~1~|~1~|~01/SAF~|~Friction treatment and curve warning signs at Faraday Road from President Drive to Cass Avenue 112040~|~1~|~1~|~01/SAF~|~Intersection improvements at Dressler Rd/Everhard and Dressler Rd/Belden Village St. 112040~|~1~|~2~|~02/S>2/NCAN~|~North Canton waterline work. 123020~|~1~|~1~|~01/STR~|~Intersection plan split. 92649~|~1~|~2~|~02/S<2~|~Overlay with asphalt concrete SR 66 in Shelby County:SHE SR 66 11.10 to 14.33 92649~|~1~|~1~|~01/STR~|~ Overlay with asphalt concrete SR 66 & SR 219 in Shelby County:SHE SR 66 SLM 8.08 to 11.10SHE SR 219 SLM 0.00 to 0.76 119221~|~1~|~1~|~01/IMS~|~Mowing in District 8 119221~|~1~|~2~|~02/IMS~|~Mowing in D7 99855~|~1~|~1~|~01/NFA~|~REbuild deck edges with anodes. Remove and replace asphalt wearing surface and waterproofing. Reface abutment walls (no anodes). Encase pier columns, rebuild wingwalls, seal concrete work and on SFN 4602889 patch pier cap with SCC. 99855~|~1~|~2~|~02/S<2~|~Rebuild deck edges with anodes, encase pier columns and seal concrete work. 99855~|~1~|~3~|~03/STR~|~Bridge rehab on rural bridge. 113239~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work. 121286~|~1~|~1~|~01/NFA~|~Culvert replacement project. GAL 790 3.32, CFN 1820235. 97704~|~1~|~1~|~01/IMS~|~Bridge painting project and beam repair. WAS 77 1637 L (SFN 8403511), WAS 77 1637 R (SFN 8403546), WAS 77 1687 L (SFN 8403570), and WAS 77 1687 R (SFN 8403600). Interstate route funded 90 federal/10 state. 111400~|~1~|~1~|~01/S<2~|~Small City Program Funding for SR 61 reconstruction project (FY2023) 111400~|~2~|~2~|~02/S<2~|~District Urban Paving Funding to participate in the paving per the urban paving guidelines 19794~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal)/4PS7(20% State) - No CAP - for bridge painting on 1) 1600761 COS SR60 6.91 Intersect: Little Wakatomika Creek and 2) 1601091 COS SR60 24.04 Intersect: Killbuck Creek 19794~|~1~|~2~|~02/S<2~|~"02/S<2/BR/ " - District Preservation 4PF7(80% Federal)/4PS7(20% State) - No CAP - For Bridge painting on 1) 2300257 FAI US22 13.58 Intersect: Hunters Run and 2) 6006280 MUS SR555 11.34 Intersect: Over Muskingum River 19794~|~1~|~3~|~03/NFA~|~"03/NFA/BR/ " - District Preservation 4PS7 (100% State) - No CAP - For bridge painting on 6005276 MUS SR208 0.87 Intersect: Over Muskingum River 102651~|~1~|~1~|~01/S<2~|~Bridge Replacement: HUR-547-7.25 (SFN 3904326)?Structure(repl) (002) 121573~|~1~|~1~|~01/S5K~|~Urban Paving Plan Split for resurfacing costs 121573~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope items, such as full depth pavement repairs and any work associated curbs, curb ramps, and sidewalks. 113614~|~1~|~1~|~01/SAF~|~Rehabilitation and replacement of sidewalk improvements to include signage, marked crosswalks and bike racks. 121203~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items on southern section of main street (South of Ohio Ave). 121203~|~1~|~2~|~02/MPO~|~Plan split for federally eligible work items on northern section of Main Street. (North of Ohio Ave) 112862~|~1~|~1~|~01/NHS~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Cos-US 36-26.42; 2) Lic-SR 16-12.74 112862~|~1~|~2~|~02/S>2~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Lic-US 40-2.71; 112862~|~1~|~3~|~03/S<2~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Fai-SR 37-12.60; 2) Mus-SR 719-0.15; 3) Fai-US 22-12.86; 112862~|~1~|~4~|~04/STR~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Mus-SR 60-8.86; 2) Lic-US 40-19.58 114745~|~1~|~1~|~01/NHS~|~Resurfacing. 114745~|~1~|~2~|~02/NHS~|~Bridge maintenance. 122822~|~1~|~1~|~01/MPO~|~City of Hamilton EV projects 2026 102045~|~1~|~1~|~01/NHS~|~Slide repair on JAC 32 16.58. 102045~|~1~|~2~|~02/NHS~|~Culvert replacement on JAC SR 32 16.60 (CFN 1971977) 106717~|~1~|~1~|~01/SAF~|~plans split for project 114476~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 92150~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 2 years mowing contract 97910~|~1~|~1~|~01/ENH~|~West Third Street from Paul L. Dunbar to Orchard Ave - The project will consist of replacement of defective sidewalks and curb ramps, and the installation of banners, trash receptacles, bike racks and other assorted amenities. 107954~|~1~|~1~|~01/IMS~|~Landscaping upkeep and maintenance on the I70/I75 interchange. 112229~|~1~|~1~|~01/NFA~|~D09 Guardrail Project FY2026. 122824~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAC 4CD7). Construction phase cap set at $454,582.00 with a 20% match (TRC) 97871~|~1~|~1~|~01/SAF~|~Intersection improvement project to create a double roundabout. MRG 37 9.59-9.83, MRG 60 12.31-12.47, and MRG 669 19.42-19.45. Includes both municipalities on either side of the bridge (Malta and McConnelsville). 97871~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay. MRG 37 9.71, SFN 5800129. Rural other federal aid funded 80 federal/20 state. 97871~|~1~|~3~|~03/ENH~|~Construction of a 5 foot wide walkway on the south side of the bridge (MRG 37 9.71, SFN 5800129) that includes railing and lighting. TAP and 4BG7 funds. 98505~|~1~|~2~|~02/STR~|~Resurfacing TRU SR 193 from 6.78 to 7.18 and 9.57 to 14.91. 98505~|~1~|~1~|~01/S>2~|~Resurfacing TRU US 422 from 17.53 to 18.93 and TRU SR 193 from 7.18 to 9.57. 98505~|~1~|~3~|~03/STR~|~Change Order work associated with Tim Horton's access management corrections. 121603~|~1~|~1~|~01/MPO~|~Construct asphalt multi-use path along roadway. 102380~|~1~|~1~|~01/IMS~|~Guardrail repair. 102380~|~1~|~2~|~02/IMS~|~Type A guardrail installation. 102380~|~1~|~3~|~03/IMS~|~Guardrail repair in Montgomery County 122496~|~1~|~1~|~01/MPO/CANT~|~Resurfacing. 116737~|~1~|~1~|~01/IMS~|~All work is in this plan split. 113404~|~1~|~1~|~01/NFA~|~Install/replace raised pavement markers on various county roads throughout Fayette County 111085~|~1~|~1~|~01/NFA~|~Repair structure HOL-179-0395 (SFN 3802124) by replacing the existing slab and approach slabs. Project will also rebuild the abutments above the footing, upgrade the bridge railing, encase the pier piling and replace the RCP. Full depth pavement replacement from the railroad tracks to the intersection with S.R. 226 will be required. 112751~|~1~|~1~|~01/NFP~|~Reactive Maintenance. 114108~|~1~|~1~|~01/STR~|~Two-lane resurfacing project on WAS CR 32 0.00-3.81 and CR 102 4.13-4.84. 93140~|~1~|~2~|~02/NFA~|~PLan Split 02/NFA/PV/ - District preservation 4PS7 (100%) - No CAP - Resurfacing on Gue-313-0.00 to 9.91 93140~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 313-9.91 to 20.99; 2) Gue-SR 313-20.99 to 21.02; 88980~|~1~|~2~|~02/STR~|~BRO SR125 Brdg F/Rehab:0802336 BRO SR125 12.290 0802387 BRO SR125 17.720 0802395 BRO SR125 17.980 0802417 BRO SR125 18.110 0802441 BRO SR125 18.220 0802484 BRO SR125 19.650 0802506 BRO SR125 20.500 80/20 split 88980~|~1~|~1~|~01/STR~|~BRO SR125 11.86 - 22.93 resurfacing projectBeginning at the intersection of SR125/US68 and terminate at the Adams County line (11.07 miles), it is proposed to resurface the existing asphalt highway.SR 125 SLM 11.86 - 22.9380/20 split 96070~|~1~|~1~|~01/NHS~|~"01/NHS/OT " - Plan Split for Construction of a Pole building for loader storage at the Knox County Quaker OP 122065~|~1~|~1~|~01/NFP~|~Plan split for Franklin County ding and dent guardrail on various routes. 95775~|~1~|~2~|~02/S5K~|~SEN-53 from SLM 7.152 to 8.35 and SLM 11.08 to 11.565 95775~|~1~|~1~|~01/STR~|~SEN-53 from SLM 0.00 to 2.87; SLM 7.14 to 7.152; SLM 11.565 to 19.24 97314~|~1~|~1~|~01/STR~|~LAW CR 5 & CR 29 resurface 91953~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance Funds for one year 97015~|~1~|~1~|~01/NFP~|~Lighting maintenance project. 119331~|~1~|~1~|~01/S>2~|~Resurfacing. 111860~|~1~|~1~|~01/NFP~|~Chip-sealing of existing park drives at Lost Creek and Maple Ridge. 109832~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order. 107800~|~1~|~1~|~01/NFP~|~FAY-729-6.61 to 9.67 FAY-729-10.50 to 14.82 FAY-734-6.78 to 12.56 MAD-729-0.00 to 1.75 107800~|~1~|~2~|~02/STR~|~FAY-729-0.00 to 5.44 124944~|~1~|~1~|~01/MPO~|~OKI STBG funds for project eligible expenses 107576~|~1~|~1~|~01/IMS~|~Mowing contract for SFY 2021. 107576~|~1~|~2~|~02/IMS~|~Mowing Contract in D7 on:MOT IR 675 SLM 0.00 to 7.44MOT IR 75 SLM 0.00 to 9.31 105270~|~1~|~1~|~01/NHS~|~Bridge replacement project. ATH Richland Ave 0.83, SFN 0560073. NHS route funded 95 federal/5 local. 105127~|~1~|~1~|~01/STR~|~Culvert replacements 105127~|~1~|~2~|~02/STR~|~Water line relocation 98805~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for elgible resurfacing work items. 76461~|~1~|~1~|~01/NHS~|~SCI US23 11.48 - 16.68 76461~|~1~|~2~|~02/NHS~|~Bridge Preventative Maintenance SCI 23 12.79L 7300336SCI 23 12.79R 7300360 114575~|~1~|~1~|~01/STR~|~Overlay on ROS 772. 114575~|~1~|~2~|~02/S<2~|~Overlay on ROS 772 114575~|~1~|~3~|~03/S<2~|~Overlay on ROS 772. Local match 114575~|~1~|~4~|~04/S<2~|~100% local 114575~|~1~|~5~|~05/S<2~|~Bridge PM. 113717~|~1~|~1~|~01/SAF~|~Improvements at the I-75 and SR-73 interchange including dual left turn lanes to the SB entrance ramp, right turn lane on the NB exit ramp, side mounted signal heads on SB exit ramp, right turn lane to Sharts Dr and a multi-use path along the south side of SR-73 to Conover Drive. 119429~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs ASD-96-0.00 to 3.521, ASD-603-3.62 to 11.574, RIC-603-4.72 to 9.36 119429~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs ASD-96-3.521 to 3.905 123770~|~1~|~1~|~01/BRO~|~Bridge Overlay project 107693~|~1~|~1~|~01/IMS~|~Replace the rigid overlay in the SB direction of the HAM-75-0173 and 0219 bridges over Liberty St and Banks St respectively. 120172~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in construction 91551~|~1~|~1~|~01/BRO~|~Bridge rehabilitation project. Work includes pile encasement with substructure repair. HOC 595 0495, SFN 3704327. BR eligible funded 80 federal/20 state. 84542~|~1~|~1~|~01/STR~|~Resurfacing MOE 800 13.80-15.46, 17.92-26.04 and MOE 26 14.68-16.42. Federal 80%/State 20% STP Rural. 105533~|~1~|~1~|~01/S<2~|~Urbanized Area Plan Split: DEL-315-8.61-8.65 & 8.66-8.68 FRA-665-3.52-6.31, 4.13-5.18 & 7.39-8.34 105533~|~1~|~2~|~02/IMS~|~Interstate Plan Split: FRA-270-0.00-0.60 105533~|~1~|~3~|~03/NHS~|~General System NHS Plan Split: Various locations along FRA-3 105533~|~1~|~4~|~04/STR~|~Rural Plan Split: FRA-655-5.18-7.39 105533~|~1~|~5~|~05/NHS~|~Priority System NHS Plan Split: DEL-23-16.10-20.84 FRA-33-22.33-24.27 105533~|~1~|~6~|~06/S>2~|~COC Urban Paving Plan Split: Various locations along FRA-3 98178~|~1~|~1~|~01/STR~|~STP Rural NON-BR Bridge Rehab 80/20 Fed/State PIC22-7.55 and 10.5 deck overlay 98178~|~1~|~2~|~02/S<2~|~STP <200 Bridge Replace 80/20 Fed/State PIC-188-0.25 95383~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - District Preservation - Federal (80%)/State (20%) - No CAP - Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) Gue-SR 209-10.94-10.95(Location 9); 2) Gue-SR 209-11.27-11.29(Location 10); 3)Mus-US 22-7.95-7.96(Location 1); 4) LIC-40-4.57-4.59(Location 3); 95383~|~1~|~3~|~03/S<2~|~"03/S<2/OT/ " - District Preservation - Federal (80%)/State (20%) - No CAP - Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) KNO-229-9.71-9.72(Location 11); 2) LIC-13-6.48-6.49(Location 6); 3) MUS-22-14.68-14.69(Location 2); 95383~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation - Federal (80%)/State (20%) - No CAP - Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) FAI-37-6.34-6.36(Location 8); 2) LIC-40-7.16-7.18(Location 4); 3) LIC-37-23.64-23.65(Location 7); 4) PER-13-39.33-39.35(Location 5); 95383~|~1~|~4~|~04/NHS~|~District Preservation - Federal (80%)/State (20%) - No CAP - Smart Cities Infrastructure Upgrade to support the increased use of Intelligent vehicles: 1) Gue-SR 209-10.94-10.95(Location 9); 2) Gue-SR 209-11.27-11.29(Location 10); 114618~|~1~|~1~|~01/S<2~|~Chipseal in JAC. 114618~|~1~|~2~|~02/STR~|~Chipseal in JAC. 120474~|~1~|~1~|~01/NFP~|~Construction of improvements to US 68 and at the intersection of US 68 with Brush Row Road, associated with the feasibility study being performed under PID 115388. 77263~|~1~|~1~|~01/IMS~|~Widen IR-76 to six lanes from SR 21 to Barber Road in the City of Norton, Summit County, Ohio. 119405~|~1~|~1~|~01/S>2~|~Resurface Trail and Enhancements 116882~|~1~|~1~|~01/NHS~|~Resurfacing 100602~|~1~|~1~|~01/STR~|~Microsurfacing on CAR-43 from SLM 16.15 to SLM 22.32 114772~|~1~|~1~|~01/NFP~|~Guardrail repairs and upgrades on various routes throughout District 4. 87181~|~1~|~1~|~01/STR~|~Located 1.03 mile east of Dry Bone Road (CR8). 80% fed/20% state 6601200 PIK SR124 7.47 Intersect: Kincaid Creek01/STR/BR/State 119363~|~1~|~1~|~01/S>2~|~Reconstruction and roadway improvements 109437~|~1~|~1~|~01/MPO~|~Construction of sidewalk along Paddison Road from Beechmont Avenue to the existing walk at Bluecrest Drive. 123431~|~1~|~1~|~01/STR~|~bridge plan split. 87890~|~1~|~1~|~01/IMS~|~Remove existing bridges carrying IR 77 (TUS-77-2596 L & R, SFN 7903391, 7903421) and replace with embankment. 116961~|~1~|~1~|~01/S>2~|~Resurfacing 112502~|~1~|~1~|~01/STR~|~Chip Seal 112502~|~1~|~2~|~02/NFA~|~Resurfacing 100983~|~1~|~1~|~01/STR~|~DSR# TUS-005 115712~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - District Preservation Funds - 100% State (4PS7) 95573~|~1~|~1~|~01/S>2/LORD~|~Resurfacing of Ellsworth-Bailey Road (CR-91) from the Mahoning County Line to Lyntz Road, in the Village of Lordstown, Trumbull County, Ohio. 95573~|~1~|~2~|~02/NFP/LORD~|~Pavement and Incidentals covered by Turnpike funds between SLM 0.97 and SLM 1.09 (300' North and South of Hallock Young Road Intersection) near the Ohio Turnpike, in the Village of Lordstown, Trumbull County, Ohio. 107014~|~1~|~1~|~01/NFA~|~Improvements to US 224 115575~|~1~|~1~|~01/NHS~|~All work on the small bridges and four culverts in the project 115380~|~1~|~1~|~01/ENH~|~Safe Routes to School items 93312~|~1~|~2~|~02/NFP~|~This split is for the extensive landscaping proposed by the LPA. 93312~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to construct a round about at LUC CR130 1.25-1.35 andLUC SR64 3.75-3.83 113457~|~1~|~1~|~01/STR~|~Landslide repair from OH20-01 ER event. 108150~|~1~|~2~|~02/S>2~|~Columbus Urban Area: FRA-40-24.60-24.66 108150~|~1~|~3~|~03/S>2~|~100% City of Reynoldsburg plan split. 108150~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-40-22.43-23.93, 24.25-24.60 & 24.66-25.19 108150~|~1~|~4~|~04/S>2~|~Work within the City of Columbus (FRA-40-22.43 to 22.45). No local share will be required. 97688~|~1~|~2~|~02/NFA/MAD~|~100% Madison County funding for school flashers on Linson Rd, Price Hilliards Rd, and Killbury-Huber Rd 97688~|~1~|~1~|~01/STR~|~Replace school flashers at several locations 124588~|~1~|~1~|~01/SAE~|~Plan split for roundabout at US42 & Old 122/Middletown Rd (Part 1). 124588~|~1~|~2~|~02/SAE~|~Plan split for Part 2 which covers PID 124820. Left turn lane at US42 & Township Line Rd. 122350~|~1~|~1~|~01/SAF~|~Install crosswalk, RRFB, and lighting 102829~|~1~|~1~|~01/NHS~|~Micro surfacing of NHS route 102829~|~1~|~2~|~02/S>2~|~Microsurfacing US-40 (City of Columbus Urban Area Route) 122648~|~1~|~1~|~01/MPO~|~Plan split for MPO STBG funded eligible resurfacing work. 122648~|~1~|~2~|~02/NFP~|~Plan split for non-eligible bridge work at 100% local cost. 94145~|~1~|~3~|~03/S>2~|~STP Urban Resurfacing FRA-161-13.45 to 13.67100% state 94145~|~1~|~1~|~01/NHS~|~Paving of priority sytem portion of project. UNI-33-24.89-25.11; FRA-33-0.00-1.30. D6 Federal/State $ 94145~|~1~|~2~|~02/STR~|~Post Rd/161 and ramp resurfacing 100% stateFRA-161 13.31 to 13.45 113685~|~1~|~3~|~03/NFA~|~Van Tassel River Access Drive Micro 113685~|~1~|~1~|~01/SAF~|~Safety funded Micro for Interstate areas 113685~|~1~|~2~|~02/SAF~|~Paving split for Luc 184 0.0 to 0.04 -NB off-ramp at the US-23 Exit 234 (Alexis/Monroe) Interchange 105892~|~1~|~1~|~01/S>2~|~Split for urban paving funding for resurfacing 105892~|~1~|~2~|~02/NFP~|~Split for 100% local items of work. 120809~|~1~|~1~|~01/NFA~|~Raised pavement markings. 97856~|~1~|~1~|~01/MPO~|~Construct Veterans Trail from Barlow Road to Veterans Way in the City of Hudson. 123679~|~1~|~1~|~01/S>2~|~Plan Split for large Urban locations 97995~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of SFN 2301350 listed above 107272~|~1~|~1~|~01/STR~|~Slide repair. 94335~|~1~|~1~|~01/ENH~|~test for Plan splits add/Nirmala Test 94335~|~1~|~2~|~02/ENH~|~Test 116742~|~1~|~1~|~01/MPO/CUYF~|~Reconstruction. 107289~|~1~|~1~|~01/S>2~|~Split for eligible urban paving work 90835~|~1~|~1~|~01/MPO~|~Widening of sidewalks on both sides and narrowing the street width to match the existing typical section of Main Street at Greene Street. Also included is the installation of streetscape features such as brick pavers, decorative street lighting, benches and sign posts the entire length of the project. 93582~|~1~|~1~|~01/S<2/VIOL~|~"01/S<2/OT/VIOL" - Violet Township SRTS 4SC7 (100% Federal) - CAP $420,000.00 - SRTS side walk project on: 1) Fai-TR 221-00.54 to 00.71 Harmon Road; 2) Fai-TR 1480-00.00 to 00.56 Meadow Wood Drive; 3) Fai-TR 1474-00.00 to 00.14 Graden Street; 118834~|~1~|~1~|~01/STR~|~Culvert replacement on PIK CR 57 97428~|~1~|~1~|~01/SAE~|~Installation of new and upgrading of existing guardrail on various roads within Richland County. 105896~|~1~|~1~|~01/ENH~|~Enhancement Work 86745~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for all work using TRAC funds. 115087~|~1~|~1~|~01/NFA~|~Items of work for Ohio Exposition Center 114973~|~1~|~1~|~01/STR~|~All work is in this plan split using district allocations from SACs 4PF7 (80%) and 4PS7 (20%). 76289~|~1~|~1~|~01/NHS~|~ Reconstruct the interchange of IR275/SR32 to accommodate 20 year projected traffic. This will include work on SR32. Phase 1 construction+Eastgate structure and Phase 1&2 right of way. 76289~|~2~|~2~|~02/S>2~|~Construction of four bridges needed to allow the Aicholtz Connector to pass under IR 275 114163~|~1~|~1~|~01/NHS~|~Split for pavement work on SR-44 114163~|~1~|~2~|~02/SAF~|~Safety funding for construction work to install a turn slot and signal at Hosford Road. 114163~|~1~|~3~|~03/NFP~|~Split for 100% state TSMO funding to improve intersection geometry and improvements on Girdled Road 107799~|~2~|~3~|~03/IMS~|~DEL-71 Pavement Repairs and ramp resurfacing 107799~|~1~|~1~|~01/IMS~|~Interstate Paving Split: FRA-71-25.61-27.74, FRA-270-24.55-26.50 107799~|~1~|~2~|~02/IMS~|~Interstate Bridge Split: SFN's 2511169, 2511320, 2511444 & 2511533 107799~|~1~|~4~|~04/SAF~|~Install Recessed Wet Reflective (R-WR) Pavement Markings 107799~|~1~|~5~|~05/IMS~|~Provide smart arrow boards 107799~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 87247~|~1~|~2~|~02/STR~|~ROS US50 5.01 - 11.27 Rehab bridgs:7103115 ROS US50 8.9 Intersect: California Hollow Run7103158 ROS US50 11.26 Intersect: CR149 (Jones Levee Rd)80/20 split02/STR/BR/State 87247~|~1~|~1~|~01/STR~|~ROS US50 5.01 - 11.27On US50, beginning at the corp limit of Bainbridge (SLM 5.010) and heading east for 6.1 miles (SLM 11.26) terminating 0.85 miles east of CR149 (Jones Levee Road), it is proposed to resurface the highway with asphalt concrete.Brdg is pave thru.7103077 ROS US50 6.64 Intersect: Paint Creek80/20 Split01/STR/PV/State 87247~|~1~|~3~|~03/SAF~|~Safety - Curve Improvem,entImprove the superelevation of the curve and install a high friction surface treatment with this resurfacing project to correct crashes. 90%fed/10%state 96000~|~1~|~1~|~01/BRO~|~SFN 4802527 and 4802551 96000~|~1~|~2~|~02/STR~|~from SLM 8.94 to 11.469 96000~|~1~|~3~|~03/S>2~|~from SLM 11.469 to 12.41 105893~|~1~|~1~|~01/S>2~|~Split for urban paving funding 105893~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items not eligible for urban paving funds 107459~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 107459~|~1~|~1~|~01/NHS~|~Resurfacing of SR 8 from 4.26 to 7.81. 115126~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall. 106374~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridges. 106215~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 50 29.79, SFN 8200505. Rural other federal aid funded 80 federal/20 state. 95003~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 107861~|~1~|~1~|~01/NHS~|~Slips on US 0030 Rural 87660~|~1~|~2~|~02/CMQ/AQUA~|~Private waterline replacement. 87660~|~1~|~3~|~03/CMQ~|~Widening for two new through lanes on STA SR 687. 87660~|~1~|~1~|~01/CMQ~|~Resurfacing of of State Route 687 and Brunnerdale intersection in Jackson Township, Stark County, Ohio. 87660~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 82881~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 37 8.22-9.70 and MRG 78 0.00-16.83. Rural other federal aid funded 80 federal/20 state. 105022~|~1~|~1~|~01/NFA~|~Asphalt resurfacing of the ODOT District 11 Complex. 100951~|~1~|~1~|~01/NHS~|~Fine graded polymer AC overlay to ATB US 20 from 0.00 to 2.00. 97105~|~1~|~1~|~01/IMS~|~Seal bridge decks and wearing sufaces using a flexible epoxy overlay on SFNs 5706513 and 5706483. 101147~|~1~|~1~|~01/NHS~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide. 109931~|~1~|~1~|~01/S<2~|~"01/S<2/PV/NWRK" - rehabilitation of Thornwood Drive between River Road and Faye Drive. 109600~|~1~|~1~|~01/NHS~|~Intersection Improvement at LAW 52 20.45 and Walmart Way. 102210~|~1~|~1~|~01/S<2~|~LAW CR 31 0.36 ER Slide Repair 110315~|~1~|~1~|~01/MPO~|~Federally eligible 102485~|~1~|~1~|~01/NHS~|~Microsurfacing of HAS-250 122116~|~1~|~1~|~01/STR~|~All bridge replacement work included in this split. 113841~|~1~|~1~|~01/IMS~|~Slope stabilization along Ramp C at the Wards Corner interchange on CLE-275 83002~|~1~|~1~|~01/SAF/ZANE~|~"01/SAF/PV/ZANE" - Safety Funding - CAP of $1,404,589.96 Safety Program (4HJ7 Funding) and a CAP of $292,088.46 Large City Funds (4TA7/ZA05) using 4BC7 to match both -Realignment of Dresden Road (MUS CR 2) with MUS SR 60 at the 18.35-18.5 and the Bethesda Drive onto MUS SR 60 at the 19.42-19.64. Local participation in match and overages required 112900~|~1~|~1~|~01/NFA~|~Culvert replacement. 102905~|~1~|~1~|~01/S<2~|~Urban Area Pavement - All of Ott-53. 108823~|~1~|~1~|~01/NHS~|~Tree Removal. 89063~|~1~|~1~|~01/BRF~|~80/20 funding split for bridge work eligible for federal local bridge funds. 76465~|~2~|~5~|~05/IMS~|~Pavement marking and RPM's for Part 2 76465~|~1~|~3~|~03/IMS~|~Pavement Markings / RPMs 76465~|~1~|~1~|~01/IMS~|~Fed/state minor rehab pvmt workFRA-670: 0.00-3.8801/IMS/PV/ 76465~|~2~|~4~|~04/IMS~|~Microsurfacing FAY/MAD IR 71 76465~|~1~|~2~|~02/IMS~|~Fed/state minor work (sealing/cleaning) on 17 bridges2504340 FRA IR670 0.17 Intersect: Over I-6702504367 FRA IR670 0.21 Intersect: Over Mckinley Avenue2504375 FRA US33 0.31 Intersect: Over Scioto R, Us33, Rr2505746 FRA IR670 1.05 Intersect: 670 Ramp C Over Scioto R2505762 FRA IR670 1.08 Intersect: 670 M.L.Over Scioto River2505770 FRA IR670 1.09 Intersect: 670 Ramp B Over Scioto R2505789 FRA IR670 1.49 Intersect: 670 Over Scioto Overflow2505843 FRA IR670 2.07 Intersect: 670 Ramp Sc Over Scioto R2505819 FRA IR670 2.13 Intersect: Over Us33 & Scioto R.2505878 FRA IR670 2.17 Intersect: 670 Ramp Se Over Scioto R2505924 FRA IR670 2.36 Intersect: 315 / Olentangy R2517574 FRA IR670 2.65 Intersect: CSX RR2517590 FRA IR670 2.81A Intersect: Ramp ND / Goodale2517647 FRA IR670 2.82 Intersect: Goodale Conn.2517612 FRA IR670 2.83B Intersect: Ramp NC Goodale Conn.2517639 FRA IR670 3.14 Intersect: Neil Ave2506246 FRA IR670 3.81B Intersect: 670E over 232517795 FRA IR670 3.87A Intersect: Ramp over Service Rd02/IMS/BR/ 109871~|~1~|~1~|~01/NFP~|~D09 Auxiliary Markings (A) FY2025 105129~|~1~|~1~|~01/NHS~|~Bridge painting project. WAS 7 24.27 (SFN 8402167), WAS 7 37.62 (SFN 8402477), WAS 50 4.89 L (SFN 8401381) and WAS 50 4.89 R (SFN 8401411). NHS route funded 80 federal/20 state. 101367~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 160 16.05, SFN 8201684. Rural other federal aid funded 80 federal/20 state. 88278~|~1~|~1~|~01/ENH~|~ROS Frankfort SRTS Phase 2 - Safe Routes to SchoolWithin the Village of Frankfort it is proposed to do Phase 2 of their SRTS project which includes the following:High Street: Sidewalks from Anderson Ave. east to Temple StreetPorter Ave.: Sidewalks from Brown St. north to High St.Main Street: Sidewalks from High St. north to Eastern Ave. 100% Fed 01/ENH/OT/Frankfort 98747~|~1~|~1~|~01/BRF~|~SFN 8736278 99668~|~1~|~1~|~01/NFP~|~Construction of North Baltimore Outpost 113308~|~1~|~1~|~01/MPO~|~work eligible for federal-aide. 77876~|~1~|~4~|~04/NHS~|~SFN 7709315 SUM-241-11.72 77876~|~1~|~1~|~01/IMS~|~Concrete pavement restoration of SUM-IR76, from SLM 11.80 (Inman Street) to SLM 17.98 (Portage County Line), in the City of Akron and Tallmadge, Summit County, Ohio. 77876~|~1~|~2~|~02/BRO~|~See linked bridges. 77876~|~1~|~3~|~03/IMS~|~See linked bridges. 82462~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete in Sidney on SR 47 from Kuther Road (SLM 12.69) to VanDemark Road (SLM 13.71). 112735~|~1~|~2~|~02/MPO/BARB~|~Resurfacing of Norton Ave in the City of Barberton. 112735~|~1~|~1~|~01/MPO/BARB~|~Resurfacing of Snyder Ave and Hopocan Ave in the City of Barberton. 79550~|~1~|~2~|~02/BRO~|~Replace one deteriorated structure with minimal approach work, three span, length 82', Level 1 Design in Ansonia at 0.40 Miles North of Junction SR 47 and SR 118 over the North Fork of Stillwater River.SFN 1901621 DAR SR 118 0849 79550~|~1~|~1~|~01/STR~|~Pipe removal and copper service branc requested by the village in ansonia. 102368~|~1~|~1~|~01/STR~|~Microsurfacing 121837~|~1~|~1~|~01/NFA~|~installation of EV charging station in City of Trenton 124497~|~1~|~1~|~01/SAF~|~Plan split for all work on FUL-66 88776~|~1~|~1~|~01/ENH~|~West Main Street (Bus-35/US-42), from S. Church St. to S. King St. Project includes addition of ornamental street lighting, curb and sidewalk replacement, pedestrian crossings, ADA curb ramps, banners, street trees, tree grates, benches, trash recepticles, bike racks, and wayfinding signs in Xenia. 121442~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD. 111377~|~1~|~1~|~01/NFP~|~SUM TID - New Park Drive reconstruction. 112737~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to MRW-19-6.43 andMRW-288-0.7 98634~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate route. 107504~|~1~|~1~|~01/NHS~|~Concrete pavement repairs on JEF-22 85334~|~1~|~1~|~01/ENH~|~"01/ENH/BR/MTVE" - Enhancement Funding 4B37(80% Federal) / 4BG7(20% Local) - CAP of $1,540,600.00 for 80% Federal Share - Enhancement project to construct a bridge and connecting bike trail in Mt Vernon connecting to the Kokosing River Parkway Bike Trail 94104~|~1~|~1~|~01/ENH~|~Test Project to add funding split and verify the report 101501~|~1~|~1~|~01/STR~|~DSR# BEL-020 76352~|~1~|~1~|~01/IMS~|~Minor pavement rehabFRA-270 SLM 40.45-43.4501/IMS/PV/ 76352~|~1~|~2~|~02/IMS~|~Minor bridge work - not BR eligible2512106 FRA IR270 41.87 Intersect: Livingston Run2512114 FRA IR270 42.15 Intersect: Livingston Ave2514524 FRA IR270 43.18 Intersect: Rt Cd Road Over NS RR2514559 FRA IR270 43.18 Intersect: Over NS RR2514613 FRA IR270 43.01 Intersect: Lt CD Road Over Ramp2514648 FRA IR270 43.01 Intersect: Rt CD Road Over Ramp2514702 FRA IR270 43.01 Intersect: Over Ramp 70EB To 270NB2514710 FRA IR270 43.01 Intersect: Over Ramp 70EB To 270NB2514737 FRA IR70 42.82 Intersect: Rt CD Road Over IR 702514761 FRA IR70 42.82 Intersect: Lt CD Road Over IR 702514796 FRA IR70 42.82 Intersect: Over I-702514826 FRA IR70 42.82 Intersect: Over I-7002/IMS/BR/ 113002~|~1~|~1~|~01/STR~|~Plan split for work on the CLE-222 culvert 113002~|~1~|~2~|~02/S>2~|~Plan split for work on the CLE-132 culvert 121921~|~1~|~1~|~01/ENH~|~Install a multiuse path along Johnson Road to connect the Hock-Hocking Adena Bike Path to State Route 682. Work includes drainage improvements, pedestrian lighting, crosswalks, pavement marking and signs. 104370~|~1~|~1~|~01/IMS~|~Plan split for pavement work 98319~|~1~|~1~|~01/NHS~|~JAC SR 93 17.58-24.46 98319~|~1~|~2~|~02/NHS~|~JAC 32 20.21 (4003756 & 4003780) 123739~|~1~|~1~|~01/STR~|~Plan Split for resurfacing STP Rural 114809~|~1~|~1~|~01/STR~|~Rural plan split 107662~|~1~|~1~|~01/S<2~|~Concrete repairs for COL-14 and COL-344 in the City of Salem 107662~|~1~|~2~|~02/S<2~|~Work requiring 100% city funds, including auxiliary pavement markings and curb ramps. 79563~|~1~|~1~|~01/BRO~|~Bridge replacement project. MEG 124 0125 (SFN 5300967). BR Eligible. Funded 80 federal/20 state. 117850~|~1~|~1~|~01/MPO~|~Plan Split for TMACOG (MPO) STBG Funds (4TA7) 117850~|~1~|~2~|~02/MPO~|~STBG funded Plan Split for sidewalks. 117850~|~1~|~3~|~03/NFP~|~Plan Split for 100% locally funded scope, such as replacement of 42" drainage pipe. 85269~|~1~|~3~|~03/NHS~|~SFN 8600910 85269~|~1~|~2~|~02/S<2~|~On WIL 2 from SLM 0.00 to 1.27 85269~|~1~|~1~|~01/NHS~|~Resurface WIL US20A 1.1-4.77 and WIL-15 from 8.01 to 15.02 116386~|~1~|~1~|~01/NHS~|~COL-30 108329~|~1~|~1~|~01/STR~|~Landslide repair project. 100% Federal ER funded. 121725~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs MED-421-0.00 to 3.436 including bridge maintenance 121725~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs MED-421-1.277 to 2.883. Local funding for pavement repairs in village of Lodi 96526~|~1~|~1~|~01/S>2~|~Generic Plan split. This is a Block project. 91509~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH US 33 12.72 LT and RT (SFN's 0500844 and 0500879), HOC US 33 8.30 (SFN 3700429), and ATH 682 0.04 (SFN 0500925). NHS, 80% Federal and 20% State. 91509~|~1~|~2~|~02/S<2~|~Bridge painting project. HOC 328 11.33 (SFN 3703878). Urban other federal aid funded 80 federal/20 state. 114299~|~1~|~1~|~01/IMS~|~Tree clearing 101946~|~1~|~1~|~01/NHS~|~Replacing linked structure. 114368~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " 114368~|~1~|~2~|~02/S5K~|~Plan Split 02/S5K/PV/ for Mus-146-16.05 to 17.545 85217~|~1~|~1~|~01/STR~|~Funding split for all pavement work 108759~|~1~|~1~|~01/NFP/ODNR~|~ODNR Pavement Funding - 4BF7 (100% State) - No CAP - Resurfacing of routes R-1, R-3, R-8, R-18, R-31, R-32 and Lodge Parking Lots. 123735~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m. 111635~|~1~|~1~|~01/IMS~|~Concrete deck overlay project. NOB 77 4.75 L (SFN 6100392) and R (SFN 6100422). Interstate route funded 90 Federal/10 State. 105378~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route: MIA SR 48 SLM 5.70 to 8.74 85112~|~1~|~4~|~04/ENH/BRID~|~"03/ENH/OT/Brid" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/local project share for enhancements in Bridgeport. 85112~|~1~|~1~|~01/S<2~|~"01/S<2/PV" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/state D-11 project share. 85112~|~1~|~3~|~03/ENH/BROO~|~"03/ENH/OT/Broo" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/local project share for enhancements in Brookside. 85112~|~1~|~2~|~02/ENH~|~"02/ENH/OT" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/state Enhancement/D-11 project share of enhancement work (4B37/4PS7); up to the federal 4B37 cap of $947,900 less the 4B37 funds used on Split 3 and 4 in Brookside and Bridgeport, respctively. 115993~|~1~|~1~|~01/STR~|~Slide repair 85934~|~2~|~2~|~02/MPO/San~|~Revised Plan Split 2 for 100% local items 85934~|~1~|~1~|~01/MPO~|~Mill and fill 116739~|~1~|~1~|~01/NHS~|~All work is in this plan split. 94430~|~1~|~1~|~01/STR~|~Bridge Replacement 104923~|~1~|~1~|~01/NFA~|~Dayton Freight truck replacement project 101047~|~1~|~1~|~01/NHS~|~SUM SR 8 from 13.31 to 14.99. 101047~|~1~|~2~|~02/S>2~|~SUM SR 303 from 8.94 to 10.54SUM SR 619 from 3.00 to 3.85 101047~|~1~|~3~|~03/STR~|~SUM SR 303 from 5.49 to 8.94 98381~|~1~|~3~|~03/NHS~|~See linked structures. 98381~|~1~|~2~|~02/NHS/KENT~|~Resurfacing POR SR 261 0.72 to 2.59 in the City of Kent. 98381~|~1~|~1~|~01/NHS~|~Resurfacing POR SR 261 from 0.00 to 0.72 and 2.59 to 3.51. 122102~|~1~|~1~|~01/NHS~|~Plan split for repairing retaining wall 122946~|~1~|~1~|~01/S50/HEAT~|~Thornwood Dr from Lees Dr to Ridgely Tract Dr in Licking County. 93097~|~1~|~2~|~02/STR~|~HUR-601-0.00 to 1.96 93097~|~1~|~3~|~03/S<2~|~HUR-601-1.96 to 4.36 93097~|~1~|~1~|~01/NHS~|~Gap Project - Reactive Spot Paving/Repairs for HUR-20-10.76 to 16.36 101023~|~1~|~2~|~02/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Full Depth Repairs and Spot Paving on NOFAS-Rural routes in District 5, PER-555-0.81 to 3.73 101023~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5, COS-83-19.42 to 26.68, COS-93-15.40 to 20.60, PER-13-20.15 to 25.87, PER-555-3.80 to 4.20, GUE-313-14.94 to 14.98 101023~|~1~|~3~|~03/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Full Depth Repairs and Spot Paving on IMS routes in District 5, BEL-70-0.00 to 0.04, GUE-70-28.17 to 28.48, LIC-70-9.58 to 15.07. 116052~|~1~|~1~|~01/NFP~|~Plan split for bridge electrical maintenance 97949~|~1~|~1~|~01/NHS~|~Overlay SR 48 & SR 49 in Montgomery County:MOT SR 48 SLM 16.14 to 17.85MOT SR 49 SLM 12.12 to 15.96 104248~|~1~|~1~|~01/NFA~|~The Village will improve, widen and extend Eric Wolber Ave starting just south of the industrial Lane intersections. The length of the project approx. 1,600 feet. 119554~|~1~|~1~|~01/S>2~|~Bicycle and Pedestrian improvements 119642~|~1~|~1~|~01/IMS~|~Split for ramp work 119642~|~1~|~2~|~02/IMS~|~SPR funded work - wrong way bump pad 114689~|~1~|~1~|~01/SAE~|~Implementation of distracted driving corridor 102231~|~1~|~1~|~01/NFA~|~Replacement of Water Street Bridge over Cowles Creek in the City of Geneva, Ashtabula County, Ohio. 102231~|~1~|~2~|~02/NFA/GENE~|~Reconstruction of North Cedar Street in the City of Geneva, Ashtabula County, Ohio. 85188~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. 1806602 100116~|~1~|~1~|~01/IMS~|~Construction Inspection 94673~|~1~|~1~|~01/S<2~|~Replace concrete beam bridge due to deterioration. SFN 4602137 LOG 235 2200 over Black Hawk Run. 111579~|~1~|~1~|~01/MPO~|~Federally eligible items. 114222~|~1~|~2~|~02/STR~|~Chip sealing. 114222~|~1~|~1~|~01/S5K~|~Chip sealing. 111348~|~1~|~1~|~01/NFP~|~ODNR project for gravel road resurfacing in Jesse Owens State Park. Funded 100% State. 104715~|~1~|~1~|~01/IMS~|~Austin Road interchange Phase 2 enhancement project - landscaping at the interchanges on-fields and off-fields 119211~|~1~|~1~|~01/NHS~|~Columbus Urban Area Plan Split 105034~|~1~|~1~|~01/MPO~|~80/20 split with ERCP 114603~|~1~|~1~|~01/MPO~|~This plan split includes all work associated with constructing the shared use path along Irwin Simpson from Mason Montgomery to Duke Blvd. 117233~|~1~|~1~|~01/CMQ~|~Primary plan split for CMAQ eligible scope. 120111~|~1~|~1~|~01/S5K~|~All roundabout (safety) work included in this split. 120111~|~2~|~2~|~02/BRO~|~All bridge work included in this split. Replace deck, abutments, and paint the structure over Chicago, Ft. Wayne & Eastern Railroad. Make various drainage improvements north and south of the bridge limits such as catch basin, curb, and conduit replacements. (Part 2) 120111~|~3~|~3~|~03/NHS~|~All RCUT related work at US 30 and John Brown Road. Part 3 113957~|~1~|~1~|~01/MPO~|~Resurfacing related items. 104286~|~1~|~1~|~01/NHS~|~Pruning, Tree/Bush Removal 98774~|~1~|~1~|~01/NFA~|~Replace SFN 7845022 Morford Road bridge over Stratton Creek. 98158~|~1~|~1~|~01/S>2~|~Widening of Broad Street (SR-444) between Sandhills Road and Spangler Road, from 2 to 3 lanes to provide a center turn lane, installation of curb and gutter and storm sewer, and installation of sidewalk on both sides of the roadway. 110007~|~1~|~1~|~01/NHS~|~Pruning 118689~|~1~|~1~|~01/ENH/STPK~|~Bridge Replacement. 121447~|~1~|~1~|~01/IMS~|~Plan split for reconstruction of I-75 (no capacity added). 121447~|~1~|~2~|~02/IMS~|~Plan split for I-75 reconstruction with widening (added capacity). 121447~|~1~|~3~|~03/IMS~|~Plan split for I-75 bridge replacements. 121447~|~1~|~4~|~04/NHS~|~Plan split for reconstruction of SR 562 (NHS system). 121018~|~1~|~1~|~01/STR~|~All work is within this split 120769~|~1~|~1~|~01/NFP/MILL~|~Resurfacing. 109979~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 550 9.21. 119848~|~1~|~1~|~01/NFP~|~Resurfacing project on MOE CR 29 7.02-10.49 and CR 29A 0.00-0.10. Funded 100% State. 101273~|~1~|~1~|~01/STR~|~WIL-US 127 from SLM 15.05 to 20.25 121000~|~1~|~1~|~01/NHS~|~plan split to resurface HAM-126 121000~|~1~|~2~|~02/NHS~|~plan split for Major Investment funded pavement reconstruction 111665~|~1~|~1~|~01/STR~|~Culvert rehab 117040~|~1~|~1~|~01/BRO~|~Plan split for all work on LUC-65-0535 107805~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 124 2.12-2.14. 100% Federal ER funded. 106131~|~1~|~1~|~01/S<2~|~New Sidewalk on Carnation Drive in the City of Wapak (SRTS). 110256~|~1~|~1~|~01/MPO~|~Construct a two way in street cycle track in the south curb lane of West Third Street from Ludlow Street to Robert Drive. 100237~|~1~|~1~|~01/NFP~|~Chip seal ATB SR 7 from 0.00 to 2.37 and 18.42 to 21.00, ATB SR 166 from 0.00 to 2.61, POR SR 88 from 13.70 to 16.43, TRU SR 7 from 25.04 to 27.80, TRU SR 193 from 14.91 to 17.78 and TRU SR 305 from 0.00 to 1.57. 98515~|~1~|~1~|~01/STR~|~The bridge in this project meets the state but not the federal defination of a bridge. Federal and state funds from the District Preservation Program budget. No local funds. 113677~|~1~|~1~|~01/SAE~|~100% Safety funded items - Signal items 115905~|~1~|~1~|~01/MPO~|~Plan split for eligible MPO funded sidewalk work. 120419~|~1~|~1~|~01/NFP~|~Established Plan Slit 01/NFP/OT 91869~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 2303213 FAI SR256 13.33 Intersect: Paw Paw Creek #; BR Eligible for Replacement: Length=99 SD/FO(1) SR=54.8 DSR=4 91869~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 2303183 FAI SR256 9.95 Intersect: Poplar Creek; Not BR Eligible for Rehabilitation: Length=123 SD/FO(0) SR=93.0 DSR=6 101165~|~1~|~1~|~01/STR~|~SFN 7402465 Span length 10 feet. 91915~|~1~|~2~|~02/STR~|~Pave culvert inverts. VIN 50 20.68 (SFN 8200483). Rural other federal aid funded 80 federal/20 state. 91915~|~1~|~1~|~01/BRO~|~Pave culvert invert. GAL 35 11.16 (SFN 2701049). BR eligible funded 80 federal/20 state. 82472~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing of the existing roadway with Item 448, asphalt concrete (2 lane resurfacing) on DAR SR 571 from 0.00 to 6.73. 121311~|~1~|~1~|~01/NFP~|~Created for TID involvement 112192~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. 91527~|~1~|~1~|~01/BRO~|~Concrete deck overlaySFN 6500390, PIC-22-18.37, over Hargus Creek01/BRO/BR/ 122000~|~1~|~1~|~01/STR/SOME~|~Pedestrian Safety Improvements 114770~|~1~|~1~|~01/STR~|~Chipseal in HIG & ROS 114770~|~1~|~2~|~02/S<2~|~Chipseal on ROS 28. 85872~|~1~|~1~|~01/MPO~|~Installation of a minimum 10' wide shared use trail connecting Little Miami Golf Center to Clough Pike, with related drainage, extend culvert, and rail crossing at Debolt Street area. Sponsored by the Hamilton County Park District 85872~|~1~|~2~|~02/NFA~|~Work that was added via change order to be paid by the Hamilton County Park District. 105097~|~1~|~1~|~01/NHS~|~D09 Culvert Liner Project PIK 23 15.35 (CFN 1813253) 93567~|~1~|~2~|~02/ENH~|~100% City of Huron items 93567~|~1~|~1~|~01/ENH~|~on bridge structure - Lighting replacement and parapet wall repair project. 93567~|~1~|~3~|~03/ENH~|~Added Plan Split 2--100% local items for Alternate #1 lighting per 8/11/16 letter from A. White stating availability of money. 88299~|~1~|~1~|~01/SAE~|~ Sidewalks along Poole Road from Cheviot Road to Colerain Elementary School; Warning signing at Poole / Livingston intersection. 87205~|~1~|~1~|~01/STR~|~The split is for work funded with rural STP funds and a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 88994~|~2~|~2~|~02/S>2~|~Drainage and Water line reconstruction not effected by the project. 88994~|~1~|~1~|~01/S>2~|~Friendsville Road Widening Project in the City of Wooster using Small City Funds 108547~|~1~|~1~|~01/SAF~|~Construction of diverging diamond interchange (DDI) at SR-82 and SR-46 in Howland Township, Ohio. 108547~|~1~|~6~|~06/S>2~|~Installation of camera. 108547~|~1~|~5~|~05/S>2~|~Waterline relocation along SR 46 paid by the Trumbull County Sanitary Engineer. 108547~|~1~|~2~|~02/NHS~|~Replacement of TRU SR-82 structure (SFN# 7804652). 108547~|~1~|~4~|~04/S>2~|~Replacement and modification to culverts on SR 46. 108547~|~1~|~3~|~03/NHS~|~Replacement and modification to culverts on SR 82 and SR 46/SR 82 interchange ramps. 119075~|~1~|~1~|~01/MPO/MAS~|~Improvements to the intersection of Mason Montgomery Road with Tylersville Road. 90696~|~1~|~1~|~01/MPO~|~resurface Suder Ave from Manhattan Blvd to Kroger Dr 90696~|~1~|~2~|~02/NFP/TOLE~|~This plan split is for the waterline which is not eligible for federal funds 86954~|~1~|~4~|~04/NHS~|~Bridge rehabilitation of SFN# 7707444, SUM-SR91-20.08 over Tinkers Creek, in the City of Twinsburg, Summit County, Ohio. 86954~|~1~|~5~|~05/S>2/TWIN~|~Resurfacing of SUM SR 82 from 7.36 to 8.01 86954~|~1~|~7~|~07/NHS/TWIN~|~100% Local items related to Guardrail, Catch Basins, Signals. 86954~|~1~|~3~|~03/BRO~|~Bridge rehabilitation of SFN# 7707363, SUM-SR91-19.37, over Branch of Tinkers Creek, in the City of Twinsburg, Summit County, Ohio. 86954~|~1~|~6~|~06/MPO/TWIN~|~Partial depth repairs, full depth repairs, and ADA ramps, eligible for MPO STP. 86954~|~1~|~1~|~01/NHS~|~Resurfacing of State Route 91 from SLM 17.21 to SLM 17.75 in Twinsburg Township, Summit County, Ohio. 86954~|~1~|~2~|~02/NHS/TWIN~|~SUM SR 91 from SLM 17.75 to SLM 19.14 and SLM 19.27 to SLM 21.11 in the City of Twinsburg, Summit County, Ohio. 101701~|~1~|~1~|~01/NFA~|~Bridge replacement project funded by OBPP. MOE CR 29 0.85, SFN 5630908. Not on any federal aid system funded 100% federal (20% TRC). 93549~|~1~|~1~|~01/SAE~|~Port Clinton school zones. 112919~|~1~|~1~|~01/STR~|~SCI 335 11.27-16.00SCI 348 6.70-12.80 92299~|~1~|~1~|~01/ENH~|~Installation of new sidewalks, pedestrian lighting, and other scenic and environmental enhancements on State Route 219 (Main Street) from the West Corporation Limit (SLM 8.55) thru Coldwater to State Route 118 (Second Street) to ODOT section (SLM 9.31). 87547~|~1~|~1~|~01/S<2~|~A small City funded proejct to widen SAN CR6 3.71-4.22 112772~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement 95639~|~1~|~2~|~02/IMS~|~New structure: Ramp A2 over IR 70, IR 270 & Ramp D2New structure: Ramp C1 over NS RR 95639~|~1~|~3~|~03/IMS~|~Lengthen IR 70 Ramp C1 & G1 box culverts over drainage ditch 95639~|~1~|~1~|~01/IMS~|~New ramp pavement, widening IR 70 and Scarborough Blvd pavement 117961~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenane 117961~|~1~|~2~|~02/IMS~|~Plan split for ITS work on IR-475 117961~|~1~|~3~|~03/NFP~|~Bridge repair due to fire damage 101321~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for the following STP Rural routes: DEL-229-0.00-0.12 DEL-42-9.51-19.17 MAR-47-2.09-9.11 MAR-229-0.00-1.05 MAR-529-0.00-9.29 MRW-61-3.27-13.18/14.83-22.86 MRW-95-0.00-19.73/0.00-1.15 MRW-229-0.00-5.30 MRW-529-0.00-3.29/4.22-8.33 MRW-42-0.00-12.71 101321~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for the following STP Rural routes: DEL-229-0.00-0.12 DEL-42-9.51-19.17 MAR-47-2.09-9.11 MAR-229-0.00-1.05 MAR-529-0.00-9.29 MRW-61-3.27-13.18 MRW-61-14.83-22.86 MRW-95-0.00-19.73/0.00-1.15 MRW-229-0.00-5.30 MRW-529-0.00-3.29/4.22-8.33 MRW-42-0.00-12.71 108913~|~1~|~1~|~01/NFP~|~Roaming Road improvement. 105191~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE Clarington Village Market Street Bridge (SFN 5660068). Funded 95 federal/5 local. 93119~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4506480 LIC SR661 8.81 Intersect: Sr661 Over Cranetown Run; Not BR Eligible for Replacement: Length=59 SD/FO(1) SR=57.6 DSR=7 93119~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4506367 LIC SR661 1.58 Intersect: Sr 661 Over Clear Creek; Not BR Eligible for Replacement: Length=67 SD/FO(0) SR=56.4 DSR=5 102697~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. WAS SR 339 4.38-8.56. Rural other federal aid funded 80 federal/20 state. 102697~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using a microsurfacing treatment. ATH US 33 4.38-11.09 and MEG SR 32 0.00-3.83. NHS route funded 80 federal/20 state. 122242~|~1~|~1~|~01/SAF~|~Construct sidewalk and ADA compliant pedestrian crossings along Grand Blvd (CR-21) in the City of Hamilton to improve access and safety to Crawford Woods Elementary School. 77476~|~1~|~1~|~01/NHS~|~District Allocation 99878~|~1~|~1~|~01/SAE/LCEO~|~"01/SAE/OT/LCEO" - Licking County Guardrail replacement/new at various location - Approved CEAO funding max of $300,000 for FY19 122187~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-E 113491~|~1~|~1~|~01/NFA~|~Created for potential J&C involvement 117667~|~1~|~1~|~01/STR~|~Bridge deck replacement project. MOE SR 800 15.32, SFN 5603242. 118889~|~1~|~1~|~01/STR~|~All items of work associated with SLM 4.02 to 9.73. 92968~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Kno-US 36-10.14 to 14.71 92968~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on OFAH-Urban routes: 1) Kno-SR 308-00.00 to 00.96; 2) Kno-SR 308-01.32 to 02.18; 3) Kno-SR 768-00.48 to 01.70; 4) Kno-US 36-14.17 to 14.98; 5) Kno-US 36-20.68 to 20.77 92968~|~1~|~7~|~07/NFA~|~District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on NOFAS-Rural routes: 1) Kno-SR 308-00.96 to 01.32; 2) Kno-SR 308-02.18 to 03.00; 92968~|~1~|~3~|~03/S<2/MTVE~|~District Preservation TDIF Urban Paving 4PF7(80% Federal) / 4BG7(20% Local - City of Mount Vernon) - No CAP - Resurfacing with related work on: 1) Kno-SR 768-00.00 to 00.48; 2) Kno-US 36-20.77 to 20.82 92968~|~1~|~4~|~04/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on NHS routes: 1) Kno-US 36-14.98 to 15.32; 2) Kno-US 36-15.35 to 16.53; 3) Kno-US 36-16.58 to 16.80; 92968~|~1~|~9~|~09/NHS/MTVE~|~City of Mount Vernon TDIF 100% Items - 4BG7(100% Local City of Mount Vernon) - No CAP - Curb Ramps and other 100% Requested work on the NHS routes: 1) Kno-US 36-18.14 to 20.68; 92968~|~1~|~5~|~05/NHS/MTVE~|~District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local City of Mount Vernon) - No CAP - Resurfacing with related work on the NHS routes: 1) Kno-US 36-15.32 to 15.35; 2) Kno-US 36-16.80 to 18.14; 3) Kno-US 36D-00.00 to 00.01; 4) Kno-SR 13D-00.00 to 00.70; 5) Kno-SR 13-10.88 to 11.02; 92968~|~1~|~8~|~08/NHS/MTVE~|~District Preservation TDIF Urban Paving 4PF7(80% Federal) / 4BG7(20% Local City of Mount Vernon) - No CAP - Resurfacing with related work on the NHS routes: 1) Kno-US 36-18.14 to 20.68; 92968~|~1~|~6~|~06/NHS/MTVE~|~City of Mount Vernon 100% Items - 4BG7(100% Local City of Mount Vernon) - No CAP - Curb Ramps and other 100% Requested work on the NHS routes: 1) Kno-US 36-15.32 to 15.35; 2) Kno-US 36-16.80 to 18.14; 3) Kno-US 36D-00.00 to 00.01; 4) Kno-SR 13D-00.00 to 00.70; 5) Kno-SR 13-10.88 to 11.02; 90789~|~1~|~1~|~01/MPO~|~Construction of bike lanes on Helena Street from North Bend Boulevard to Keowee Street and a separated bike path on Keowee Street from Helena Street to Hillrose Avenue. 110481~|~1~|~1~|~01/SAE~|~Improve the signalized intersections of Jackson & Washington, Jackson & Clay, and at the Jackson & Monroe in the Village of Millersburg with reflective backplates, implement ITE/ODOT intervals, cycles, offsets and splits, confirm that the pedestrian button are functioning properly and if not make the necessary repairs, install GPS clock assemblies at each intersection to maintain internal controller times automatically. Also, install radar detection at Jackson & Clay street on all approaches to provide flexibility to implement second car detection for left turn phases. 112538~|~1~|~1~|~01/NHS~|~Preliminary Plan Split to program project. Update at time of scoping or plan file with work description matching final plans. 101732~|~1~|~1~|~01/BRF~|~Replace Caine Rd Bridge (SFN 0433101) over West Branch of the Ashtabula River. Bridge is approximately 0.75 miles east of Stanhope-Kellogsville Rd (CR 33)/Caine Rd (TR 579) intersection. 80122~|~1~|~1~|~01/BRO~|~Replace existing bridge (COL-644-0846, SFN 1505882) wirh a four-sided concrete box. 84565~|~1~|~1~|~01/NFP~|~100% state funds. Funds from the District Preservation Program budget. 99485~|~1~|~1~|~01/IMS~|~LOR 90 RM 100096~|~1~|~2~|~02/MPO~|~Repair and resurface North Marginal Road and South Marginal Road that is functionally classified as Other Federal-aid route using MPO STP funds. 100096~|~1~|~1~|~01/MPO~|~Repair and resurface South Marginal Road that is functionally classified as part of the NHS system using MPO STP funds. 100096~|~1~|~3~|~03/NFA~|~100% City participation for items not eligible for any other funding. 104965~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS 530 5.42 (SFN 8404445). Not on any federal aid system funded 100% state. 95449~|~1~|~1~|~01/NHS~|~Construction of shared use path adjacent to SR161 between Sawmill Road and Linworth Road. 96973~|~1~|~1~|~01/SAF~|~Improve ped signals by upgrading ped equipment at 7 intersections in North College Hill and Mt. Healthy. 123008~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. 117925~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-76-B 108652~|~1~|~1~|~01/NFP~|~Inogen Inc is one of several employers who have located in the former AG facility. The parking lots are now needed as public roads for the employees and truck traffic. The City of Brooklyn has decided to phase the overall project and this first phase will benefit Inogen. The removal, realignment and replacement of a quarter of the mile of American Road is the first phase. 79758~|~1~|~2~|~02/NHS~|~Bridge deck patching and sealing. 79758~|~1~|~1~|~01/NHS~|~Resurfacing. 103972~|~1~|~1~|~01/STR~|~Pavement work in the Village of Arlington including full depth repair. All funds are from the District Preservation Program. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. There are no local funds in this split. 103972~|~1~|~2~|~02/NFP/ARL~|~Non pavement work in the Village of Arlington including curb and gutter, drive approaches and storm drainage. Approval for a grant and a loan from the Ohio Public Works Commission (OPWC) has been received. Any funds needs over what is available from the OPWC are the responsibility of the Village of Arlington. 124790~|~1~|~1~|~01/SAF~|~Sign Replacement 111899~|~1~|~1~|~01/SAF~|~Improvements to US62 to provide bike lanes and multi-use path on between Thurston Hall Blvd. and EB 161 ramps (non-NHS) 111899~|~1~|~2~|~02/SAF~|~Improvements to US62 to provide bike lanes and multi-use path on between EB 161 ramps and Walton Pkwy and Smith's Mill Rd (NHS) 123433~|~1~|~1~|~01/BRO~|~Bridge railing replacement. 92981~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Mus-US 22-14.56 to 18.14; 92981~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Other Principal Arterial Resurfacing on Mus-US 22-13.27 to 14.56 92981~|~1~|~3~|~03/NHS/ZANE~|~"03/NHS/PV/ZANE" - City of Zanesville 4BG7(100% Local) - CAP $10,000.00 OPWC (4BG6) - For ADA Ramp compliance costs and any other additional work requested by the City of Zanesville. 92981~|~1~|~2~|~02/NHS/ZANE~|~"02/NHS/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - CAP $389,990.00 OPWC (4BG6) - Urban Paving in the City of Zanesville: 1) Mus-US 22-09.76 to 13.27; 2) Mus-US 22D-00.00 to 00.30; 3) Mus-US 22D-00.48 to 00.80; 104492~|~1~|~1~|~01/MPO~|~MPO funds plan split 102283~|~1~|~1~|~01/NHS~|~Work to repair the damage to the bridge 102283~|~1~|~2~|~02/NHS~|~Work on structure not covered by 4SR7 funding 115137~|~1~|~1~|~01/NFA~|~Chip Seal MED SR 0606 0.00-4.26. 101319~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for the following STP Rural routes: FAY-729-0.00-4.05/4.56-5.44/6.61-9.68/10.50-14.82 FAY-734-6.78-12.56 MAD-729-0.00-1.75 PIC-138-0.00-9.13 PIC-762-0.00-8.85 101319~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for the following STP Rural routes: FAY-729-0.00-4.05/4.56-5.44/6.61-9.68/10.50-14.82 FAY-734-6.78-12.56 MAD-729-0.00-1.75 PIC-138-0.00-9.13 PIC-762-0.00-8.85 116268~|~1~|~1~|~01/STR~|~Chip Seal 119470~|~1~|~1~|~01/SAE~|~CEAO HSIP 100% funded 97872~|~1~|~1~|~01/SAF~|~Improvement of the sight distance, and correction of sub-standard grades at the intersection of SR-350 with CR-7 (Farmers Road) in Clinton County, OH. 112246~|~1~|~1~|~01/NHS~|~Construction change orders 110383~|~1~|~1~|~01/STR~|~01/STR/OT/ - 90% Federal (4SF7) and 10% State (4SS7) - remediation of slide along COS-93. 114028~|~1~|~1~|~01/NFP~|~Split for bridge work 99790~|~1~|~1~|~01/NHS~|~Underdrain repair. 99790~|~1~|~2~|~02/NHS~|~Consultant continuing services during construction. 121270~|~1~|~1~|~01/S5K~|~Resurfacing. 121270~|~1~|~2~|~02/STR~|~Resurfacing. 94620~|~1~|~1~|~01/NFA~|~"01/NFA/OT/ " - Geological Site Management Funding - 4SS7 (100% State) - CAP of $430,000.00 - Rock Scaling of the Back Slope Face on Kno-SR 715 from 01.78 to 01.89 116350~|~1~|~1~|~01/IMS~|~conduits linked 95927~|~1~|~1~|~01/SAF/Alli~|~Replacement of two signals along US-62 at Fernwood and Liberty, in the City of Alliance, Stark County, Ohio. 85105~|~1~|~1~|~01/NFP~|~ Minor rehab of SR 774 in Clermont County from SR 133 to the Brown County line. 87130~|~1~|~1~|~01/IMS~|~Geotech funded Slip repair 102217~|~1~|~1~|~01/NFA~|~LAW CR 121 2.43 ER Slide repair. 112877~|~1~|~1~|~01/NHS~|~PIC-23 from SLM 17.37 to 23.16 104675~|~1~|~1~|~01/IMS~|~plan split 117329~|~1~|~1~|~01/NFA/MCEO~|~Bridge replacement of MUS-CR 67-2.86 (SFN 6049192) carrying Piper Road over Salt Creek. 117388~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 90652~|~1~|~1~|~01/STR~|~culverts at HEN SR281 0.76-0.77 and at HEN SR281 0.84-0.85 116825~|~1~|~1~|~01/NHS~|~Resurfacing. 116825~|~1~|~2~|~02/S>2~|~Resurfacing 80599~|~1~|~1~|~01/ERD~|~100% federal funding using TRC, earmark OH210 to upgrade the interchange at IR 70/US 40/SR 331. This split also includes TRAC, local and district funding. 80599~|~1~|~2~|~02/CMQ~|~CMAQ activities including turn lanes, relocating Hammond Drive intersection, improved progrssion for signal coordination, bike lanes, ped pathways, intersection/realignment of Covered Bridge Rd. Total CMAQ cap per BOM is $5 million. 80599~|~1~|~3~|~03/BRO~|~2 bridges reconstruction: SFN 0702404 BEL-70-14.28L; SFN 0702439 BEL-70-14.28R with minimal approach work. 80599~|~1~|~4~|~04/BRO~|~Bridge replacement SFN 0705160 BEL-331-14.91, for non-CMAQ eligible activities. 80599~|~1~|~5~|~05/BRO~|~Widen and replace bridge carrying SR 331 over IR 70 SFN 0705160 BEL-331-14.91. This split for CMAQ activities on bridge: turn lane, bike lanes and sidewalk. Total project Cap for CMAQ is $5 million. 80599~|~1~|~6~|~06/STR~|~This split is for the Belmont County-owned waterline and sewer relocation costs. County share maxed at $900,000. 84745~|~1~|~2~|~02/STR~|~Chip Seal - CRA-181-01.58 - 01.78/RIC-181-00.00 - 02.69 / HUR-162-19.98 - 23.53 / HUR-162-25.06 - 29.02 / LOR-162-0.00 - 08.79 / MED-162-00.00 - 02.10 / P & P Asphalt MED-162-02.10 - 02.97 (Spencer) 84745~|~1~|~1~|~01/S<2~|~Chip Seal - Urbanized Area CRA-181-00.77 - 01.58 123790~|~1~|~1~|~01/NHS~|~NHS 95720~|~1~|~1~|~01/NHS~|~SAN-20 from SLM 18.68 to 26.52 96399~|~1~|~1~|~01/NFP~|~Construction of Salt Building on ODOT West Broad Complex 101394~|~1~|~1~|~01/STR~|~DSR# BEL-005 94141~|~1~|~1~|~01/STR~|~Resurfacing. 94141~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span. 94141~|~1~|~2~|~02/STR~|~Bridge preventive maintenance > 20' span. 94141~|~2~|~4~|~04/STR~|~Superstructure replacement > 20' span. 93303~|~1~|~1~|~01/SAE~|~Battery Backup for Traffic Signals on Various Routes in Stark and Summit Counties 108811~|~1~|~1~|~01/NHS~|~Rehabilitation of southbound weigh station for use as truck parking. 122085~|~1~|~1~|~01/BRO/CRA~|~Replacement of SFN 1747495 107343~|~1~|~1~|~01/NFA~|~D09 Guardrail FY24 98871~|~1~|~1~|~01/MPO~|~Add sidewalks on SR 5 (N High St) from W Main St to Phillips-Rice Rd in the City of Cortland. 93003~|~1~|~1~|~01/STR~|~District Preservation Pavement Program using a combination of 100% 7BPB and 4PF7(80% Federal) / 4PS7(20% State) - CAP (See CAP Comments) - Resurfacing with related work on Per-SR 13-28.15 to 39.77 101731~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.0M. 118500~|~1~|~1~|~01/MPO/KENT~|~Pavement work. 99434~|~1~|~1~|~01/NFP~|~Hebicidal spraying on various routes throughout District 4. 123738~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on interstate, no added capacity 100157~|~1~|~1~|~01/S>2~|~80% federal w/20% local matching funds for project eligible work items. 121076~|~1~|~1~|~01/STR~|~STP Rural Plan Split 124316~|~1~|~1~|~01/NHS~|~Vegetation Clearing around bridges in D11 105124~|~1~|~1~|~01/STR~|~Culvert replacements - Split includes both sites on Federal Aid System: HOL-62 and HOL-514 105124~|~1~|~2~|~02/NFA~|~Culvert replacement at HOL-179-0.08 location, not on the federal aid system. 117933~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-F 102832~|~1~|~1~|~01/S>2~|~AC overlay with repair on DEL-750-4.43 to 5.65 102832~|~1~|~3~|~03/S>2~|~Smoothseal DEL-750-7.06 to 7.26 102832~|~1~|~2~|~02/NHS~|~Smoothseal on DEL-750-5.65 to 7.06. Includes deck sealing on structure over railroads 88791~|~1~|~1~|~01/S<2~|~Resurfacing 88791~|~1~|~2~|~02/S<2~|~100% 4PS7 State Funded Item - Overlay Fabric 105608~|~1~|~1~|~01/IMS~|~FRA 70, 71 and 270 locations and the associated bridges 105608~|~1~|~2~|~02/NHS~|~FRA 33, 40, 315 and 3 Locations and associated bridges 105608~|~1~|~3~|~03/S>2~|~DEL 750 locations and associated bridges 95606~|~1~|~1~|~01/CMQ~|~CMAQ & Columbus funding for widening of Lazelle Rd 118818~|~1~|~1~|~01/IMS~|~Plan split for resurfacing on IR 275 in Hamilton County.Also includes minimal approach slab work 115849~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2029. 109641~|~1~|~2~|~02/SAF~|~Plan split for Sen-67-2.68 RRFB location 109641~|~1~|~1~|~01/SAF~|~Safety plan split for Hen-109-21.06 RRFB location 106088~|~1~|~1~|~01/S<2~|~PIK 220 12.24 DSR# PIK-001 101498~|~1~|~1~|~01/S>2~|~This project will add a multiuse path, sidewalk, curb & gutter, a traffic signal, and a pedestrian crossing. It will also include pavement resurfacing, striping, and drainage improvements. Yellow Springs Fairfield Road from Spangler Road to the eastern Fairborn corporation limit. 102702~|~1~|~1~|~01/IMS~|~This plan split is for bridge work on Interstate bridge. 102702~|~1~|~2~|~02/STR~|~Pier encasement of rural bridge. 94236~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split. 123491~|~1~|~1~|~01/NFP~|~CO CE FY31-FY33 106400~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair projects. DSR ATH-006 ATH CR 44 4.37. Funded 80 federal/20 local. 104491~|~1~|~1~|~01/NFA~|~OTT-TR44 82292~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 7 25.81-35.72 (Gallipolis and Cheshire), MEG 7 0.00-4.48, 5.80-6.19. NHS route funded 80 federal/20 state. 85202~|~1~|~2~|~02/STR~|~7803036 STRUSR00046**C TRU-SR-46 26.240 26.240 14.0 7802943 STRUSR00046**C TRU-SR-46 18.550 18.550 54.0 7802749 STRUSR00046**C TRU-SR-46 18.550 18.550 14.0 7802994 STRUSR00046**C TRU-SR-46 23.700 23.700 76.0 7802773 STRUSR00046**C TRU-SR-46 18.550 18.550 14.0 7802714 STRUSR00046**C TRU-SR-46 18.550 18.550 12.0 7802889 STRUSR00046**C TRU-SR-46 18.550 18.550 60.0 7802986 STRUSR00046**C TRU-SR-46 23.700 23.700 51.0 7802919 STRUSR00046**C TRU-SR-46 18.550 18.550 23.0 7802676 STRUSR00046**C TRU-SR-46 18.550 18.550 12.0 7802692 STRUSR00046**C TRU-SR-46 18.550 18.550 12.0 85202~|~1~|~1~|~01/STR~|~Resurfacing SR46 form 18.49 to 26.34. 121479~|~1~|~3~|~03/NHS~|~Resurfacing. 121479~|~1~|~1~|~01/IMS~|~Deck replacement and install new culverts adjacent to bridge. 121479~|~1~|~2~|~02/IMS~|~Resurfacing. 98818~|~1~|~2~|~02/SAF/FRA~|~Up to $60,000 of safety funding for back plates & LED bulbs at the one Franklin County location of Cleveland at Innis 98818~|~1~|~1~|~01/SAF~|~100% Safety funding for various back plates, LED bulbs, poles, wiring at all jurisdictions except FRA County 122880~|~1~|~1~|~01/NFP~|~All work included in this plan split. 122127~|~1~|~1~|~01/MPO~|~City of Dublin - Connect Emerald Parkway to Tuller Road including a new bridge over IR 270 93903~|~1~|~1~|~01/SAE~|~101 G resurfacing purchase order contract. Mill and fill treatment to improve skid resistance on ATH 13 4.00-4.50, GAL 35 17.25-17.50 EB, GAL 35 16.90-17.60 WB, and MRG 78 14.15-14.80. 100% safety federal funds. 106762~|~1~|~1~|~01/NFP~|~ODNR funded project at Burr Oak State Park Road R-X for a slip repair. Funded 100% state. 89279~|~1~|~1~|~01/ENH/GRAN~|~"01/ENH/OT/GRAN" Granville Twsp pedestrian bridge project funded with Enhancement dollars total max $1,056,000 102868~|~1~|~1~|~01/IMS~|~Micro surfacing Interstate routes 102868~|~1~|~2~|~02/NHS~|~Micro surfacing NHS routes 102868~|~1~|~3~|~03/S>2~|~Micro surfacing STP > 200k routes 102868~|~1~|~4~|~04/STR~|~Micro surfacing STP Rural routes 104851~|~1~|~1~|~01/NFP~|~Split for bridge repair work 96275~|~1~|~1~|~01/NHS~|~Bridge Sealing: CRA-30-17.29 / CRA-598-1.99 / CRA-602-0.76 99919~|~1~|~1~|~01/STR~|~100% CEAO CSTP funding for pavement markings 111000~|~1~|~1~|~01/STR~|~Split for bridge replacement 94223~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split. 104810~|~1~|~1~|~01/STR~|~Resurfacing on the rural section of the route. 104810~|~1~|~3~|~03/S<2~|~Resurfacing on small urban route. 104810~|~1~|~2~|~02/S>2~|~Resurfacing on urban section. 121719~|~1~|~1~|~01/S5K~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) LOR -254-0.00 to 2.806 including bridge maintenance 121719~|~1~|~2~|~02/S>2~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) LOR -254-2.806 to 2.811 93156~|~1~|~2~|~02/S<2~|~General system paving of MAR-309: 14.48-15.35In Marion func class area 93156~|~1~|~1~|~01/STR~|~General system paving of MAR-309: 0-14.48In rural func class area 93156~|~1~|~3~|~03/STR~|~Concrete deck overlay over Bell-Harraman Ditch SFN 5101530 - MAR 309-10.87 94414~|~1~|~1~|~01/BRF/PCEO~|~"01/BRF/BR/PCEO" - CEAO LBR Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP $429,600.00 Federal + 15% Credit Bridge CAP of $80,550.00 equals total federal of $510,150.00 - Rehabilitation of SFN 6434681 PER TR131 1.35 Intersect: Little Monday Crk; BR Eligible for Replacement: Length=33 SD/FO(1) SR=40.0 DSR=7 115197~|~1~|~1~|~01/ENH~|~Replacement of small portions of the Regional Bike Trail as a result of utility cuts, root heave, and sub-surface conditions. The project will also include resurfacing as needed to extend the life of the trail making the most of the original investment. 100031~|~1~|~1~|~01/ENH~|~Construction of a 12' wide multi-use path that parallels Harrison Avenue on abandoned rail corridor between Marie Avenue and Lee Court. 100031~|~1~|~2~|~02/ENH~|~Local will paying for a 2" electrical conduit for the future use by the police for emergency call stations. 98997~|~1~|~1~|~01/S>2~|~Ottawa River Rd 112332~|~1~|~1~|~01/NFP~|~Plans split for GR maintenance 100912~|~1~|~1~|~01/IMS~|~plan split 1 added for purchase order 100912~|~2~|~2~|~02/S50~|~plan split 2 added for purchase order funding 96299~|~1~|~1~|~01/STR~|~Bridge Replacement SFN 4003306, SLM 0.77 103069~|~1~|~1~|~01/S<2~|~Landslide repair project. MOE 536 1.96. DSR MOE-001. 116526~|~1~|~1~|~01/NHS~|~Resurfacing. 85251~|~1~|~1~|~01/IMS~|~Resurface WOO IR75 5.04-19.91 100061~|~1~|~1~|~01/NFA~|~Slide Repair LAW 215 16.70 120122~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 104811~|~1~|~1~|~01/NHS~|~Replace decks on structures MAR-23-16.75 L/R 104811~|~1~|~2~|~02/NHS~|~Repair and deck sealing on MAR-23-18.15 L/R 108980~|~1~|~1~|~01/BRF~|~Fed/State Exchange Bridge Plan SPlit 98312~|~1~|~1~|~01/SAF~|~Install overhead flashing beacons at the intersection of SR 43 & SR 171 in Carroll County. 121245~|~1~|~1~|~01/SAF~|~District wide pavement markings 92214~|~1~|~1~|~01/STR~|~WOO SR281 0.61-0.62 WOO SR281 1-1.01 WOO SR281 1.53-1.54 WOO SR281 3.05-3.06 WOO SR281 3.54-3.55 110583~|~1~|~1~|~01/STR~|~MRW 229 from SLM 5.43-6.49 118972~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding 121971~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the construction of the roundabout 123365~|~1~|~1~|~01/NFA~|~Resurfacing JEF-524 and CAR-524 123365~|~1~|~2~|~02/STR~|~Resurfacing CAR-542 111269~|~1~|~1~|~01/ENH/FRED~|~Items/costs eligible for TAP funding. Quantities include items included in Base Bid and Additive Alternate Bid. 117542~|~1~|~1~|~01/NFP~|~parking areas resurfacing. 118697~|~1~|~1~|~01/STR/ASD~|~Pavement Marking 112312~|~1~|~1~|~01/NFA~|~Bridge rehabilitation project. HOC CR 174 0.30, SFN 3731731. Work includes a deck replacement with minor repairs on the abutments and piers. Federal/State Exchange Program funded 80% State/20% Local. 107830~|~1~|~1~|~01/STR~|~FAY 734 and Bridges 107830~|~1~|~2~|~02/NFA~|~FAY-753 102299~|~1~|~1~|~01/NFA~|~HIG TR 225 (2.09-2.74 & 2.97-3.25) 88708~|~1~|~1~|~01/SAE~|~Safety project to add a turn lane at 25 onto I-475 110004~|~1~|~1~|~01/IMS~|~Work on HAM-275 110004~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 92213~|~1~|~1~|~01/NFA~|~Various county routes in Henry and Lucas Counties. 92213~|~1~|~2~|~02/STR~|~WOO-CR189 HEN-CR3 WOO-TR21 92213~|~1~|~3~|~03/S>2~|~LUC-Waterville-Monclova Rd (LUC-CR124) 86970~|~1~|~1~|~01/IMS~|~8706816 WOO US23 33.74 Intersect: Ir 75 Sbl & Ir 475 Nbl 112263~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 26 & 27 108054~|~1~|~4~|~04/S<2~|~Replace signs at various locations.AUG-US-33 SLM 2.54 to 16.30DAR-US-36 SLM 10.41 to 13.29DAR-US-127 SLM 13.16 to 13.31 108054~|~1~|~7~|~07/NHS~|~Replace various signs in the City of Riverside on SR 4.MOT-SR-4 SLM 20.40 to 22.00 108054~|~1~|~6~|~06/NHS~|~Replace various signs in the City of Dayton on routes US35, SR 4, SR 444 and SR 49.MOT-US-35 SLM 11.33 to 15.30MOT-SR-4 SLM 17.11 to 20.40MOT-SR-4 SLM 22.00 to 23.15MOT-SR-444 SLM 0.00 to 0.49MOT-SR-49 SLM 1.08 to 2.77 108054~|~1~|~2~|~02/NHS~|~Replace signs at various locations.CHP-US-68 SLM 0.00 to 0.31CLA-US-68 SLM 7.42 to 15.18CLA-SR-4 SLM 6.76 to 8.88LOG-US-33 SLM 10.89 to 26.40MOT-US-40 SLM 14.17 to 14.44MOT-SR-49 SLM 0.00 to 1.08MOT-SR-49 SLM 2.77 to 8.48MOT-CR-99 SLM 0.00 to 3.78MOT-CR-99 SLM 0.24 to 1.29MOT-CR-601 SLM 1.42 to 2.26 108054~|~1~|~3~|~03/STR~|~Replace signs at various locations.AUG-SR-29 SLM 0.42 to 0.75CLA-SR-54 SLM 5.41 to 5.79 108054~|~1~|~1~|~01/IMS~|~Replace Signs at various locations.AUG-IR-75 SLM 4.78 to 7.25CLA-IR-70 SLM 6.57 to 25.42MIA-IR-70 SLM 2.34 to 18.12MOT-IR-70 SLM 3.14 to 21.14MOT-IR-75 SLM 0.55 to 15.34MOT-IR-75 SLM 18.31 to 23.08MOT-IR-675 SLM 0.00 to 7.44SHE-IR-75 SLM 4.80 to 19.79MOT-75-IR SLM 15.34 to 18.31 108054~|~1~|~8~|~08/S>2~|~Signs replace on Wagner Ford Road at the IR 75 interchange by Montgomery County Engineer.MOT-CR-218 SLM 0.00 to 0.36 108054~|~1~|~5~|~05/S>2~|~Replace signs at various locations.CLA-SR-72 SLM 12.96 to 13.50MIA-SR-41 SLM 11.13 to 11.49MIA-SR-55 SLM 9.56 to 10.13MOT-US-35 SLM 10.21 to 11.33MOT-US-40 SLM 14.44 to 14.56MOT-CR-53 SLM 4.66 to 4.67MOT-CR-53 SLM 4.95 to 5.45MOT-CR-99 SLM 1.58 to 1.80MOT-CR-99 SLM 15.43 to 15.45MOT-CR-116 SLM 0.01 to 0.09MOT-CR-230 SLM 14.11 to 14.39MOT-CR-601 SLM 1.26 to 1.42MOT-CR-601 SLM 2.26 to 3.20 124311~|~1~|~1~|~01/ENH/TWIN~|~Construction of a multipurpose trail. 108405~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. 93482~|~1~|~1~|~01/IMS~|~Emergency funding for bridge on I-70 damaged by accident 114881~|~1~|~2~|~02/S>2~|~Plan split for resurfacing work on LUC-295 between SLMs 7.615 - 12.25 114881~|~1~|~1~|~01/STR~|~Plan split for resurfacing work on LUC-295 between SLMs 2.48 - 7.615 116610~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items on FRA-670. 119882~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 101369~|~1~|~2~|~02/STR~|~Bridge painting project. GAL 588 1.69 (SFN 2700786) and GAL 775 9.265 (SFN 2704684). Rural other federal aid funded 80 federal/20 state. 101369~|~1~|~1~|~01/NHS~|~Bridge painting project. GAL 35 17.68 (SFN 2701448), GAL 35 17.43 (SFN 2701413), NHS route, Federal funds 80%/20% State. 93988~|~1~|~1~|~01/BRF~|~SFN Bridge Replacement on TR13 (Leesville Road) 113041~|~1~|~1~|~01/NHS/ASHT~|~Resurfacing, urban paving in the City of Ashtabula. 113041~|~1~|~2~|~02/S5K/ASHT~|~Resurfacing, urban paving in the City of Ashtabula. 113041~|~1~|~3~|~03/S5K/ASHT~|~100% City items for ADA curb ramps and full and partial depth repairs. 114578~|~1~|~1~|~01/STR~|~Rockfall repair project. MOE 78 24.46. Work includes drape and trim blasting. 84513~|~1~|~2~|~02/NHS~|~District wide bridge sealing. 84513~|~1~|~4~|~04/STR~|~Bridge sealing for various Non-NHS STP bridges. 84513~|~1~|~1~|~01/IMS~|~District wide bridge sealing contract. 84513~|~1~|~3~|~03/S<2~|~Bridge sealing for various bridges. 102194~|~1~|~1~|~01/IMS~|~Split for work on the sanitary sewer line over I-90 120371~|~1~|~1~|~01/NHS~|~Install traffic signal 108937~|~1~|~1~|~01/NHS~|~FY2022 Urban Paving in the City of Cincinnati on US 50. This plan split is the 80% ODOT and 20% City items on the Urban Portion of US 50. 108937~|~1~|~2~|~02/NHS~|~FY2022 Urban Paving in the City of Cincinnati on US 50. This plan split is the 100% City items on the urban portion of US 50. 102912~|~1~|~1~|~01/STR~|~Pavement 106535~|~1~|~1~|~01/BRF~|~HIG TR 239 0.88 (SFN 3632601) 89009~|~1~|~1~|~01/NHS~|~Resurfacing project using and asphalt overlay and milling. Work includes curb ramps, pavement marking and inclusion of some minor counter measures from past traffic safety study. WAS 7 23.02-23.71. 80% Federal (WWW-MPO) and 20% Local. 89009~|~1~|~2~|~02/NHS~|~Resurfacing project using and asphalt overlay and milling. Work includes curb ramps, pavement marking and inclusion of some minor counter measures from past traffic safety study. WAS 7 23.20-23.71. 100% local items. 113253~|~1~|~2~|~02/NFP/KENT~|~Items funded 100% by the City of Kenton. 113253~|~1~|~1~|~01/S5K/KENT~|~Resurfacing of US 67 in the City of Kenton in Hardin County. 80% Federal funds from the District 1 budget with the 20% match provided by the City of Kenton. 98569~|~1~|~1~|~01/STR~|~Plan Split for the pavement work in the rural portion 98569~|~1~|~2~|~02/S>2~|~Plan Split for the pavement work in the large urban portion 98569~|~1~|~3~|~03/STR~|~plan split for the bridge work 98555~|~1~|~1~|~01/STR~|~Plan Split for rural locations. 98555~|~1~|~2~|~02/S5K~|~Plan Split for the Small Urban sections on GRE-380 112711~|~1~|~1~|~01/STR~|~Concrete deck overlay on structure PIC-316-431 (SFN 6503020) 112711~|~2~|~2~|~02/S<2~|~Concrete deck overlay on structure PIC-762-033 (SFN 6503764) 102960~|~1~|~1~|~01/NFP~|~ASD-250-8.46-12.22. 102960~|~1~|~2~|~02/NFP~|~Bridge work ASD-179 88902~|~1~|~1~|~01/STR~|~Resurfacing SR153 9.87-14.69 88902~|~1~|~2~|~02/STR~|~not BR Eligible: SFN 7605293 SR153 11.30 over Black Run 88902~|~1~|~3~|~03/NHS~|~NEW. Install rumble strips on US-30 from SLM 30.40 to 31.50. To be incorporated in Construction via change order. 119930~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT 95309~|~1~|~2~|~02/IMS~|~Work on interstate structures eligible for BR funds at 90/10 split: 1808591, 1808621, 1808656 95309~|~1~|~4~|~04/NHS~|~Work on NHS structures eligible for federal BR funds: 4305884 95309~|~1~|~3~|~03/NHS~|~Work on NHS structures at 80/20: 2801515, 2801523, 1814869 95309~|~1~|~5~|~05/BRO~|~Work on other federal aide highway structures eligible for BR funds: 1801473 95309~|~1~|~1~|~01/IMS~|~Work on interstate structures at 90/10 split: 1812122, 1812130, 1813390, 1812149 93277~|~1~|~1~|~01/STR~|~General system paving of MRW-95: 8.12-19.73 85296~|~1~|~1~|~01/SAE~|~Reconfigure SR-5 at New Milford Road intersection to restrict thru traffic and left turn movements from New Milford Road, Portage County, Ohio. 105231~|~1~|~1~|~01/STR~|~Culvert repair. 91667~|~1~|~1~|~01/NFP~|~4CP7 funding for mowing, litter pick-up, mulching 100889~|~1~|~1~|~01/STR~|~PIK 104 6.27 (SFN 6600999) 114666~|~1~|~1~|~01/IMS~|~Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. 97207~|~1~|~1~|~01/NFP~|~Culvert replacement 99435~|~1~|~1~|~01/NHS~|~90% federal w/10% local matching funds for HSIP eligible work. 109129~|~1~|~1~|~01/SAF~|~Convert TWSC intersection into a single-lane roundabout. 109129~|~1~|~2~|~02/SAF~|~Project Work Items at 100% City Cost that are not Project Eligible. 99654~|~1~|~1~|~01/SAF~|~Install Smart Micro in City of Elyria.LOR-20-16.93 to 19.40LOR-57-16.17 to 18.86 (excludes the SR57/US20/Cleveland St Intersection) 99654~|~1~|~2~|~02/STR~|~-Overhead flasher removals, LED stop signs - Various locations-Signal head replacements ERI-4-8.86 and Strub Rd / WAY-21-5.85 and Eastern Rd-Overhead flasher beacon replacements - Various locations. 99654~|~1~|~3~|~03/STR~|~-RIC US42 13.00 and Grace St. - Signal Cable Replacement-ERI US 0250 02.10 and Strub Rd / ERI-4-8.86 and Strub Rd - UPS Battery Backup Replacements-Traffic Signal and Overhead Flasher Relamping - 65 locations 101873~|~1~|~1~|~01/IMS~|~LOR 90 Gap 121360~|~1~|~1~|~01/SAF~|~Lighting repairs and upgrades 122458~|~1~|~1~|~01/NHS~|~PROTECT bridge carrying SR 7 over Glenn's Run (formally known as Nixon Run) by placing Rock Channel Protection along both abutments. 121999~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 102669~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 2001950. 102458~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7 110005~|~1~|~1~|~01/NFP~|~Pruning 123627~|~1~|~1~|~01/STR~|~Plan Split for STP Rural 108330~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. NOB 78 2.10. DSR NOB-005. Rural other federal aid funded 100% federal ER funds. 95299~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB CR 15 0.04, SFN 6132111. Funded by the Ohio Bridge Partnership Program 100% federal. 83050~|~1~|~3~|~03/STR~|~?Drainage improvements to include addition of catch basin @ slm 7.078 together with 12? pipe, and concrete curb and gutter to be placed under and along existing guardrail.? 03/STR/OTH/State 83050~|~1~|~1~|~01/S<2~|~ROS SR28 6.00 Resurfacing ProjectOn SR28 begin project 6.00 miles east of the Highland County line. ROS-SR-28 15.98 to 17.30 01/S<2/PV/State 83050~|~1~|~2~|~02/STR~|~ROS SR28 & PIK/ROS 41 Resurfacing ProjectBegin project 6.00 miles east of the Highland County line. Pavement sections.ROS-SR-28 6.000 to 15.980PIK-SR-41 5.200 to 5.390ROS-SR-41 0.000 to 2.79 The following Brdgs are all pave thru.7101422 ROS SR28 8.78 Intersect: Stream7101457 ROS SR28 9.28 Intersect: Stream7102712 ROS SR41 1.11 Intersect: Massie Run7102747 ROS SR41 2.3 Intersect: StreamO2/STR/PV/State 93538~|~1~|~1~|~01/AVN~|~Ssecurity gate upgrades - 100% state facility funding 113839~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 108896~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 218 11.66-16.46 and GAL 553 0.00-2.34. Rural other federal aid funded 80 federal/20 state. 108896~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 218 16.46-17.14. Urban other federal aid funded 80 federal/20 state. 102334~|~1~|~1~|~01/NFA~|~Bridge rehab on local bridge. 93256~|~1~|~1~|~01/IMS~|~Replace bridge deck and convert abutments to semi-intergral, patch piers with annodes, paint and seal structure SFN 7502435 SHE 75 1551 76340~|~1~|~1~|~01/STR~|~SFN# 7605765, STA SR183-23.51 over Deer Creek. 76340~|~2~|~2~|~02/NHS~|~SFN# 7602944 STA-US 62-35.77 Over Norfolk Southern RR, SFN# 7602448 STA-US 62T-1.38 L over Freshley Avenue, SFN# 7602456 STA-US 62T-1.38 R over Freshley Avenue, SFN# 7602472 STA-US 62T-2.37 under Beeson Street, SFN# 7602480 STA-US 62T-2.90 under Vine Street, SFN# 7602537 STA-US 62T-3.63 under Klinger Ave, SFN# 7602413 STA-US 62T-4.12 L over Rockhill Ave, SFN# 7602596 STA-US 62T-4.12 R over Rockhill Ave, SFN# 7605943 STA-SR 225-0.70 over Mahoning River, SFN# 7602855 STA-SR 173-4.47 over US 62T 119976~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 122475~|~1~|~1~|~01/NHS~|~Type 2 emergency. 115567~|~1~|~1~|~01/NFP~|~Created for J&C involvement 106907~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2023. Funded 100% state. 111645~|~1~|~1~|~01/NHS~|~Signal upgrades on STA SR 241 at SR 687. 111645~|~1~|~2~|~02/S>2~|~Signal upgrades on STA US 62 at Broadway and TRU SR 193 from Colonial Dr to SR 304. 111645~|~1~|~3~|~03/S>2/LOUI~|~Signal upgrades at STA SR 153/Constitution Ave with programmable and supplemental signal heads and controller update to avoid yellow ball trap along with installing thermoplastic pavement markings. 95854~|~1~|~1~|~01/NFP~|~Culverts @ SLM 17.12 and at SLM 17.13 103079~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 145 9.28 98521~|~1~|~1~|~01/BRO~|~District Preservation Program funds. 106308~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4. 118179~|~1~|~1~|~01/SAF~|~All items associated with the safety improvement. 105555~|~1~|~1~|~01/SAF~|~Lighting. 80020~|~1~|~2~|~02/STR~|~ROS US23 0.00 - 4.63 & PIK US23 15.84 - 16.28Bridges for Rehab:6600816 PIK US23 15.97 Intersect: Trib Of Moores Run6600840 PIK US23 16.12 Intersect: Moore'S Run7100035 ROS US23 0.39 Intersect: Crooked Creek7100094 ROS US23 0.75 Intersect: Crooked Creek7100124 ROS US23 1.09 Intersect: Crooked Creek7100167 ROS US23 1.47 Intersect: George Hollow Run7100191 ROS US23 1.64 Intersect: Stream 80/20 split02/STR/BR/State 80020~|~1~|~1~|~01/STR~|~ROS US23 0.00 & PIK US23 15.84 Resurfacing ProjectOn US23 in Ross (SLM 0.00 - 4.63) and Pike (SLM 15.84 - 16.28), beginning 0.16 mile north of the Norfolk & Southern RR overpass and ending 0.02 mile south of the TR1206, it is proposed to resurface a portion of US23.80/20 split01/STR/PV/State 102203~|~1~|~1~|~01/STR~|~LAW CR 4 4.96 ER slide repair. 97854~|~1~|~1~|~01/NFA~|~Paving Petros Lake Park parking lot, striping and signage. 81323~|~1~|~1~|~01/ENH~|~Bicycle/Pedstrian Trail - Federal Cap $292,500. Pri. 2 is for over Fed. Max. and is 100% Village of Marshallville 102970~|~1~|~1~|~01/STR~|~STP Rural SmoothSealCRA-4-11.26-22.20CRA-19-5.50-11.63CRA-97-1.96-3.63 102970~|~2~|~2~|~02/S<2~|~STP<200000 SmoothSealCRA-19-4.20-5.50CRA-19-11.63-12.06CRA-4-10.87-11.26 102970~|~1~|~3~|~03/S<2~|~80/20 Fed/CitySplit Corp City of BucyrusCRA-4-10.87-11.12 102970~|~1~|~4~|~04/S<2~|~100% CitySplit Corp City of BucyrusCRA-4-10.87-11.12 102970~|~1~|~5~|~05/STR~|~Bridge work on structures larger than 20' 102970~|~1~|~6~|~06/STR~|~Bridge work on structures less than 20' 101993~|~1~|~1~|~01/NFP~|~Pavement Marking Work Order on various routes throughout District 4. 123687~|~1~|~1~|~01/IMS~|~plan split for the interstate locations 81706~|~1~|~1~|~01/BRO~|~Replace the bearings on the existing bridge (COL-154-1530, SFN 1503782), patch the deck and repair abutments and paint structural steel. 119763~|~1~|~1~|~01/S50~|~Asphalt resurfacing US 40, US 250 and SR 767 in Bridgeport 119763~|~1~|~2~|~02/STR~|~Resurfacing SR 147 in Barnesville 119763~|~1~|~3~|~03/NFA~|~Asphalt resurfacing at Barkcamp State Park for ODNR 101750~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - Plan SPlit 1 for Gue-70-00.00 to 06.51 104761~|~1~|~1~|~01/NHS~|~Emergency bridge repair on NHS bridge. 117323~|~1~|~1~|~01/ENH~|~Gallia Freight Station Museum upgrade. Add fire sprinkler to station building, add security system to museum grounds and restore several railroad cars and locomotives for display. TAP funded 80% Federal/15% TRC/5% Local. 99778~|~1~|~1~|~01/IMS~|~Tree/Stump removal and pruning, removing ash trees in various locations throughout District 7 109156~|~1~|~3~|~03/NHS/Dela~|~This plan split covers any work that is 100% City of Delaware responsibility. It will include conduit within the City corp. limits as well as the bikepath overpass work. 109156~|~1~|~1~|~01/NHS~|~Repairs and deck overlays on 6 bridges 109156~|~1~|~2~|~02/NHS~|~Split for concrete repair along DEL-23 from SLM 10.63-10.81. Work also includes miscellaneous conduit work that is completely within ODOT jurisdiction. 109156~|~1~|~4~|~04/NHS/DEL~|~Miscellaneous drainage work. 50% covered by ODOT and 50% covered by City of Delaware. 109156~|~1~|~5~|~05/NHS~|~Repair or replace several conduits on US 23 112552~|~1~|~1~|~01/BRO~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work. 93120~|~1~|~1~|~01/S<2~|~District Allocation 102918~|~1~|~1~|~01/NFA~|~The city is proposing to reconstruct and widen approximately 4300 feet of Chester Road between the east Menard's /Cabela's property line east through Jaycox Road, in order to support the Bendix Corporation's new Corporate Campus development of north of Chester Road. 84063~|~1~|~1~|~01/SAF~|~01/SAF/OT ; The split is for work eligible for the funding approved from the ODOT Safety Program. After the Safety Program cap is reached, District Preservation Program funds will be used. 104064~|~1~|~1~|~01/STR~|~Culvert replacement on ROS 28 7.99 115173~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 98471~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal rural STP funds. 102866~|~1~|~1~|~01/IMS~|~Resurfacing Interstate route with asphalt 102866~|~1~|~2~|~02/NHS~|~Resurfacing NHS routes with asphalt 102866~|~1~|~3~|~03/STR~|~Resurfacing STP Rural routes with asphalt 102866~|~1~|~4~|~04/S>2~|~Resurfacing STP > 200k routes with asphalt 109930~|~1~|~1~|~01/NHS~|~District Preservation funds. 94376~|~1~|~1~|~01/ENH/GIRD~|~Landscaping and signing enhancement of TRU-IR80 at US-422 in the City of Girard, Trumbull County, Ohio. 97279~|~1~|~1~|~01/SAF~|~Intersections of SR-795 and Clark 97279~|~2~|~3~|~03/IMS~|~improvements at I-75/SR-795 97279~|~1~|~2~|~02/SAF~|~Intersection of SR-25 & Five Point Rd 112724~|~1~|~1~|~01/NHS~|~Overlay and paint FRA-3-17.44 (over I71) 119707~|~1~|~1~|~01/S>2/PATA~|~Replacement of SFN 4563743 102927~|~1~|~1~|~01/MPO~|~Bridge maintenance on MPO bridges 102927~|~1~|~2~|~02/IMS~|~Plan split covers bridge rehab work on IR 70 & IR 71. 122448~|~1~|~1~|~01/STR~|~Plan split for slope repair work on HEN-108 123662~|~1~|~1~|~01/S>2~|~plan split for bridge work on the HAM-22-0446 bridge 102016~|~1~|~1~|~01/S<2~|~Geological Site Management Funding - 4SF7 (80% Federal)/4SS7 (20% State) - See CAP Comment - Rock scaling and rock bolting on MUS US 22 from 5.25 to 5.36. 90238~|~1~|~1~|~01/NFA~|~Storm Sewer Repair 120200~|~1~|~2~|~02/ENH~|~Sidewalk installation to enhance pedestrian mobility. 120200~|~1~|~1~|~01/S5K~|~Reconstruction and roadway profile work. 89307~|~1~|~1~|~01/MPO~|~ Project will make improvements to the SR-129 off-ramps, add and lengthen turn lanes at multiple intersections, add additional through-lanes on Cincinnati-Dayton Road from Liberty Centre Drive to Liberty One Drive, and will replace the traffic signals at all currently signalized intersections within the project limits with mast-arm mounted traffic signals. 92348~|~1~|~1~|~01/BRO~|~4805917 LUC SR65 5.35 Intersect: Maumee R Csx Rr Summit 114619~|~1~|~1~|~01/STR~|~Overlay in LAW. 93823~|~1~|~1~|~01/ENH~|~Construction of multi-use trail for pedestrians and bicycle access between Hiram College and State Route 305 in the Village of Hiram. Provide parking access and bike racks (trailheads) at various locations. 95138~|~1~|~2~|~02/NHS~|~Culvert replacement project. NHS route funded 80 federal/20 state. Locations: MOE-7-1.75, MOE-7-15.40, MOE-7-16.40, and MOE-7-18.20. 95138~|~1~|~1~|~01/STR~|~Culvert replacement projects. Other federal aid funded 80 federal/20 state. Locations: MOE-26-1.21, MOE-78-11.45, MOE-145-9.38, MOE-556-12.94, and WAS-26-4.36. 108110~|~1~|~1~|~01/MPO~|~Resurfacing on local route in the City of Clayton. 101644~|~1~|~1~|~01/NFA~|~Emergency project to replace a bridge destroyed by flooding. GAL TR 664 0.01, SFN 2735326. Not on any federal aid system funded 95 federal/5 local. 117718~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 537 1.64, SFN 5602947. 102880~|~1~|~1~|~01/STR~|~STP pavement, excluding Montpelier from 10.320-10.800 102880~|~2~|~2~|~02/STR~|~ODOT-funded resurfacing from Part 2, Montpelier from 10.320-10.800 102880~|~2~|~3~|~03/STR~|~Village-funded curb and gutter replacement from Part 2, Montpelier from 10.320-10.800 112640~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE CR 12 18.00, SFN 5630568. Work includes approach repairs and guardrail installation. Ohio Bridge Partnership Program. Funded 100% Federal. 88631~|~1~|~1~|~01/STR~|~MRW-314 from 0.00-3.85 resurfacing 121188~|~1~|~1~|~01/STR~|~STP Rural Plan Split 121188~|~1~|~2~|~02/SAF~|~Construct sidewalks and pedestrian crosswalk RRFB's in the village of Cardington 121188~|~1~|~3~|~03/STR/Card~|~Items of work to be paid 100% by the Village of Cardington 120435~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State 22523~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using Mill and Fill process. WAS 7 10.12-14.05. Federal 80% and 20% State. 116110~|~1~|~1~|~01/S<2~|~Urban Paving project to resurface SR-18 and SR-231 in Tiffin. 116110~|~1~|~2~|~02/S<2~|~This split is for urban paving non-eligible items (full depth pavement repairs, curb, curb ramps, sidewalks,... ) 91994~|~1~|~1~|~01/STR~|~JAC SR233 0.00 - 4.37 resurfacing projectOn SR233, being project within corp limit of Oak Hill @ SR93 (SLM 0.00), head east and terminate at Galia Co. Line (SLM 4.37), it is proposed to resurface the highway with asphalt concrete.Pave Thru Brdg:4002938 JAC SR233 2.79 Intersect: Dicks Creek80/20 split 121735~|~1~|~1~|~01/BRO~|~preventative maintenance work on (SFN 3136337) Hopple Street Bridge. 84204~|~1~|~1~|~01/NFP~|~Districtwide Herbicidal Spraying Contract. 97586~|~1~|~1~|~01/SAE~|~Pavement marking on various county routes with 100% CEAO Safety funding (4HB7). 97586~|~1~|~2~|~02/SAF~|~Pavement marking on various county routes with 100% Local funds over the $150,000 CEAO Safety funding (4HB7) cap. 114462~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 2.55 to SLM 12.12 114462~|~1~|~2~|~02/S<2~|~Resurfacing SR 9 from SLM 12.12 to SR 45 99084~|~1~|~1~|~01/IMS~|~Plan split for construction 123775~|~1~|~1~|~01/NHS~|~Sys Sign Replace 90787~|~1~|~1~|~01/MPO~|~Constructing bike lanes on Broadway Street from West Third Street to Harvard Boulevard and creating a bike boulevard through the Five Oaks neighborhood on Harvard Boulevard, Richmond Avenue and Homewood Avenue. 109426~|~1~|~1~|~01/SAE~|~Upgrading/Replacing pavement markings eligible for federal-aid 109426~|~1~|~2~|~02/NFA~|~Upgrading/Replacing pavement markings not eligible for federal aid 121355~|~1~|~1~|~01/IMS~|~Funding split for bridges associated with the interstate. 121355~|~1~|~2~|~02/NHS~|~Plan split for NHS bridges. 99199~|~1~|~1~|~01/NFA~|~Build new Logan County Lakeview Outpost facility 92353~|~1~|~1~|~01/STR~|~Rural route. GSMP funds. Failed rock embankment. layback slopes to mitigate rockfall. 103712~|~1~|~1~|~01/IMS~|~Brent Spence Bridge: Painting Structural Steel Approach Spans: Painting Structural Steel 94179~|~1~|~1~|~01/STR~|~Minor invert pavement work to bridge size culverts on rural routes. 94179~|~1~|~2~|~02/S<2~|~minor invert paving to bridge size culverts on STP <200000 routes. 94179~|~1~|~3~|~03/NHS~|~minor invert paving work to bridge culverts on NHS routes. 94179~|~1~|~4~|~04/STR~|~Minor invert paving on Federal size bridge/culverts on rural routes. 96519~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 96519~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span. 96519~|~1~|~1~|~01/IMS~|~Resurfacing of TRU IR 80 from 8.56 to 12.33. 96519~|~2~|~5~|~05/IMS~|~Slope repair on TRU-IR80-10.99 (Westbound) 96519~|~1~|~4~|~04/IMS~|~Removal of existing structure and leaving abutments. 92412~|~1~|~1~|~01/ENH/MTVE~|~"01/ENH/OT/MTVE" - Enhancement Funding 4B37(80% Federal) / 4BG7(20% Local) - CAP of $670,000.00 for 80% Federal Share - Enhancement project to construct a bike trail in Mt Vernon connecting two former railroad bridges converted to bike crossings. 116702~|~1~|~1~|~01/S5K~|~Circleville Urban Area Plan Split 116702~|~1~|~2~|~02/STR~|~STP Rural Plan Split 112953~|~1~|~1~|~01/STR~|~SCI 348 12.80-18.69 100229~|~1~|~1~|~01/NFA~|~HAR City of Kenton - International Paper 95496~|~1~|~1~|~01/CMQ/LIMA~|~Work to install sidewalks down both sides of Cable Road. 80% Federal MPO-CMAQ funds with the 20% match provided by the City of Lima. The CMAQ Eligibility was approved in an April 14, 2014 letter. 90940~|~1~|~1~|~01/S<2~|~Bridge Deck Replacement (District Allocation) - SFN 7007299 99190~|~1~|~1~|~01/SAF~|~ADA VAR CR Guardrail 110120~|~1~|~1~|~01/STR~|~Culvert Replacement Plan split 120142~|~1~|~1~|~01/MPO~|~installation of electric vehicle charging infrastructure in OTR and CBD parking garage 117479~|~1~|~1~|~01/ENH~|~Sidewalk installation 118051~|~1~|~1~|~01/SAE~|~Install median cable barrier on I-275 from Blue Rock Rd to US-27. 107669~|~1~|~1~|~01/STR~|~Resurfacing on SR 199 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). 95513~|~1~|~2~|~02/STR~|~"02/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-USR 22-18.08 to 26.07; 2) Per-USR 22-00.00 to 06.77 95513~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Fai-USR 22-18.05 to 18.08 107170~|~1~|~1~|~01/NHS~|~Bridge concrete deck overlay. ATH US 33 13.09 L (SFN 0505781) and R (SFN 0505803). NHS route funded 80 federal/20 state. 80822~|~1~|~1~|~01/IMS~|~100% state funding for all work using state noise wall program funds. 93228~|~1~|~1~|~01/S<2~|~GAL 160 0.90, storm sewer replacement. Improve highway drainage. Also to include berm reshaping and ditch cleanout. Urban federal aid funded 80 federal/20 state. 122022~|~1~|~1~|~01/NFP~|~Landscape maintenance at various interchanges. 113851~|~1~|~1~|~01/MPO~|~Replacement of sidewalk and curbs on both sides of Colerain Avenue (US 27) from Jonrose to Shadycrest. 104937~|~1~|~1~|~01/ERD~|~Construction of bikeways using TIGER funds. 124271~|~1~|~1~|~01/NFA~|~All work included in this plan split. 113662~|~1~|~1~|~01/SAF~|~Construct roundabout at DEL-315/Hyatts Rd intersection 113662~|~1~|~2~|~02/STR~|~Replace culvert at intersection 104422~|~2~|~2~|~02/NHS~|~Added Plan split 2 for Luc CR 508 resurfacing - Front St 104422~|~1~|~1~|~01/NHS~|~plan split for Luc CR 509 - Millard Ave Roundabout construction 122139~|~1~|~1~|~01/NFP/AKRO~|~Installing raised crosswalks, signage, pavement markings and new curb ramps in various locations city wide. 101281~|~1~|~1~|~01/STR~|~Resurfacing. 101281~|~1~|~2~|~02/STR~|~STP rural Bridges 117607~|~1~|~1~|~01/NHS~|~Provide walls adjacent to SR 161 76415~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-SR 16-02.63 to 11.22 94315~|~1~|~1~|~01/NFP~|~ODNR project for Veto Lake Wildlife Area. Culvert replacement. Funded 100% state. 123035~|~1~|~1~|~01/NFP~|~Task order PID for CE/INS 100078~|~1~|~1~|~01/NFP~|~Reactive rear expansion joint repair of the IR-90 bridges over the Grand River 105216~|~1~|~2~|~02/S>2~|~plan Split for work on HAM-747 105216~|~1~|~1~|~01/NHS~|~Plan split for all work on the NHS routes: HAM SR 4 102891~|~1~|~1~|~01/SAE~|~Guardrail installation/upgrade on County Roads. 102891~|~1~|~2~|~02/SAF~|~100% local items 110892~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix on: MIA-55 SLM 11.03 to 11.62 114923~|~1~|~1~|~01/IMS~|~Concrete pavement repairs. 114923~|~1~|~2~|~02/NHS~|~Concrete pavement repairs. 114923~|~1~|~3~|~03/IMS~|~Bridge preventive maintenance. 114923~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance. 114923~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance 10' to 20' span. 118502~|~1~|~1~|~01/NFP~|~Created for J&C involvement 99991~|~1~|~1~|~01/BRO~|~SFN 6201202 105274~|~1~|~2~|~02/STR~|~Resurfacing of HAS-9 105274~|~1~|~1~|~01/NHS~|~HAS-9 SLM 17.22 to 18.39 101296~|~1~|~1~|~01/STR~|~Plan split for resurfacing of WOO-163 from 0.00 to 4.84 124943~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funds 122192~|~1~|~1~|~01/BRF~|~Plan Split for Bridge Replacement 84899~|~1~|~1~|~01/BRF~|~This plan split for a bridge replacement on a non federal aid route. 123936~|~1~|~1~|~01/NHS~|~Plan split for slide repair 118287~|~1~|~1~|~01/SAF/GREE~|~Construct a roundabout at the intersection of S Arlington Rd and Mt. Pleasant Rd in the City of Green. 112626~|~1~|~1~|~01/MPO/WARR~|~Resurfacing. 116725~|~1~|~1~|~01/STR~|~Resurfacing. 114779~|~1~|~2~|~02/S>2~|~Replace FRA-605-2.69 structure over Schleppi Run 114779~|~1~|~1~|~01/STR~|~Replace DEL-605-0.38 structure over Center Ditch 88914~|~1~|~2~|~02/STR~|~See Linked Structures. 88914~|~2~|~3~|~03/NFP/ODNR~|~Resurfacing of Mosquito Lake State Parking camping pads in camping area No. 2. Trumbull County, Ohio. 88914~|~1~|~1~|~01/STR~|~Resurfacing TRU-SR 88 7.03-13.95 93455~|~1~|~2~|~02/NHS~|~All work not related to Structure Work/Bridge Enhancement from RIC-30-9.26 to 13.06. 93455~|~1~|~3~|~03/NHS~|~Decorative Railing and Letters - Bridge Enhancement:RIC-US-30-09.850 and RIC-US-30-12.870. 93455~|~1~|~4~|~04/NHS~|~Rehab work RIC-30-11.58L and RIC-30-11.59R. 93455~|~1~|~1~|~01/NHS~|~New Construction (Structure) RIC-US-30-10.790, RIC-US-30-11.380, RIC-US-30-12.210 and RIC-SR-30-12.380.Major Rehabilitation (Structure Remove) RIC-US-30-12.150. 93455~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 118799~|~1~|~1~|~01/SAF~|~Guardrail upgrade/replacement project on various routes and sections in Noble County. 94324~|~1~|~1~|~01/STR~|~From SLM 1.57 to SLM 4.88 117707~|~1~|~1~|~01/MPO~|~Plan split for micromobility stations. 123531~|~1~|~1~|~01/NHS~|~Replace culvert type bridge carrying Carpenter's Run under US 30 and the on/off ramps at SR 170. 107864~|~1~|~1~|~01/STR~|~Landslide repair project, MOE 556 4.15-4.17. 80% Federal ER and 20% State funds. 124513~|~1~|~1~|~01/STR~|~STP rural 95869~|~1~|~1~|~01/NFA~|~Landslide repair with a Type A contract by building a solider pile and lagging wall and SLM 3.91 on SR 26 in Belmont County. 92159~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for 2 years 122281~|~1~|~1~|~01/NFA~|~Created for J&C involvement 115862~|~1~|~1~|~01/STR~|~Project includes construction of drilled shafts behind the existing guardrail to correct and prevent roadway slippage due to embankment failure. The paved shoulder and curb and gutter will be restored in the slip area. 102015~|~1~|~1~|~01/IMS~|~Geological Site Management Funds - 4SF7 (90% Federal)/4SS7 (10% State) - CAP (See CAP Comments) - Rock scaling and installation of CIP barrier on LIC-IR 70-24.44. 119730~|~1~|~1~|~01/STR~|~Asphalt resurfacing of SR 43 in the Village of Amsterdam, including full depth pavement repairs funded at 100% with 4SH7 (Oil & Shale) State Funds. 116567~|~1~|~1~|~01/NHS~|~Plan Split for bridge work 112720~|~1~|~1~|~01/NHS~|~replace decks on Champion, Linwood, and Ohio 119891~|~1~|~1~|~01/NFA~|~NEVI Round 2 23-A 115927~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - 80% federal (4PF7) and 20% State (4PS7) - replacement of existing structure (MUS US 22 18.03, SFN 6000576) 84468~|~1~|~4~|~04/NHS~|~Landslide repair on ATH 33 12.30-12.39. NHS route funded 80 federal/20 state. 84468~|~1~|~3~|~03/S<2~|~Concrete pavement removal and replace with full depth asphalt. ATH 13 0.00-0.04. Urban other federal aid funded 80 federal/20 state. 84468~|~1~|~2~|~02/NHS~|~Concrete pavement removal and replace with full depth asphalt. ATH US 33 11.76-13.99 and ATH 550 0.00-0.73. NHS Federal/State 80/20%. 84468~|~1~|~5~|~05/NHS~|~Landslide repair. ATH 33 11.89-11.91. DSR ATH-002. NHS route funded 100% federal ER funds. 84468~|~1~|~1~|~01/NHS~|~New full depth asphalt pavement and new full depth concrete on ATH US 33 11.76-13.99 and exit ramps. Funded 100% state 4RA7 major rehab funds. 84468~|~1~|~6~|~06/NHS~|~Landslide repair. ATH 33 13.87-13.89. DSR ATH-004. NHS route funded 100% federal ER funds. 87210~|~1~|~2~|~02/STR~|~For work on SR 66 in Van Wert County from the Delphos Urban Area Limits at the north ramps of US 30, SLM 2.34 to the Putnam County line at 4.37. Work on SR 66 in Putnam County from the Van Wert County line at 0.00 to US 224 at 2.46. Work on SR 189 in Putnam County from US 224 at 0.11 to Winkleman Street in the Village of Ottoville at 0.30. All funds are from the District Preservation Program budget. There are no Local funds. 87210~|~1~|~4~|~04/NFP/DELP~|~This is for items that will be paid 100% by the City of Delphos. 87210~|~1~|~1~|~01/S<2/DELP~|~Work on SR 66 in Van Wert County from Fifth Street at 0.47 to the corporation limits of the City of Delphos at 0.84. Work on SR 66 in Allen County from the south corporation limits of the City of Delphos at 10.49 to Fifth Street at 12.02 except for the portion from 11.3 to 11.66. Work on SR 190 in Allen County from the Fifth Street at 0.47 to where SR 190 leave the City of Delphos at 1.26 on the right side and 1.27 on the left side and then from 1.30 to 1.32 on the right side of the road. Work on SR 697 in Allen County from the Van Wert County line at 0.00 to SR 66 at 0.04. Work on SR 697 in Van Wert County from the west corporation limits of the City of Delphos at 6.68 to the Allen County line at 7.27. The split is for resurfacing inside the City of Delphos. The 20% non-federal match is the responsibility of the City of Delphos. The 80% federal funds are from the District Preservation Program budget. 87210~|~1~|~3~|~03/S<2~|~Work on SR 66 in Van Wert County from the corporation limits of the City of Delphos at 0.84 to the Delphos Urban Area boundary at the north ramps at US 30 at 2.34. Work on SR 190 in Allen County from the corporation limits of the City of Delphos which are 1.26 on the right side and 1.27 on the left side until the Putnam County line on the left side at 1.41 and the City of Delphos corporation limits on the right side at 1.30 and on the side from the City of Delphos corporation limits at 1.32 to the Putnam County line at 1.41. All work is inside the Delphos Urban Area but outside the City of Delphos. All funds are from the District Preservation Program budget. The are no local funds. 87210~|~1~|~5~|~05/BRO~|~Work to repair the bridge on SR 66 over US 30 in Van Wert County. 116578~|~1~|~1~|~01/NFA~|~Culvert replacement project. VIN 328 6.46 (CFN 1817842). 106025~|~1~|~1~|~01/NFP~|~Curb/Gutter Drainage 117363~|~1~|~1~|~01/BRF~|~Added plan split. 123816~|~1~|~1~|~01/BRO~|~Plan split for all work on SEN-4-1230 bridge 100622~|~1~|~1~|~01/STR~|~AC Overlay with repairs on: PRE SR 732 SLM 9.46 - 14.44 100622~|~1~|~2~|~02/S<2~|~Ac Overlay with repairs on: PRE SR 732 SLM 14.44 - 15.49 101377~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span. 101377~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span. 101377~|~1~|~3~|~03/S>2~|~Minor bridge work > 20' span. 101377~|~1~|~4~|~04/S<2~|~Minor bridge work > 20' span. 101377~|~1~|~5~|~05/STR~|~Minor bridge work > 20' span. 101377~|~1~|~6~|~06/IMS~|~Repair of concrete wall/median along TRU IR80 in Trumbull County, Ohio. 103478~|~1~|~1~|~01/STR~|~D03 PR FY2022. 2 Year Contract. 110138~|~1~|~1~|~01/STR~|~Smoothseal WAY-57-0.00 to 1.229, WAY-585-8.47 to 11.98 110138~|~1~|~2~|~02/S5K~|~Smoothseal WAY-57-1.229 to 2.195 116161~|~1~|~1~|~01/SAF~|~Realign CR7E to improve sight distance. 96515~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 96515~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span. 96515~|~1~|~1~|~01/IMS~|~Resurfacing. 113825~|~1~|~1~|~01/SAF~|~Split for SRTS project 103410~|~1~|~1~|~01/BRF~|~bridge split 124941~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funds. 90194~|~1~|~1~|~01/IMS~|~Highway Lighting 110466~|~1~|~1~|~01/SAE~|~Construct roundabout at the intersection of US-127 & SR-73. 110466~|~1~|~2~|~02/STR~|~Plan Split for the retroactive change order for fuel price adjustment 105162~|~1~|~1~|~01/MPO~|~Widening of Auburn Avenue to five lanes between Dorchester and Gilman Avenues. The intersection of Auburn Avenue with Huntington Place and the entrance to the Hamilton County Juvenile Detention Center will be realigned. Improvements to the Auburn Avenue intersection with Dorchester Avenue and Sycamore Street (5 points intersection) will also be investigated. 91820~|~1~|~1~|~01/BRO~|~80/20 funding split for all funds on this project. 91820~|~1~|~2~|~02/ENH~|~80/20 fund split for items of work using enhancement funds. 93393~|~1~|~1~|~01/BRF~|~Johnnycake Rd Bridge SFN 6734952 over feeder canal tributary 91435~|~1~|~1~|~01/BRF~|~Superstructure replacement. VIN 328 2.30 (SFN 8202532). BR Eligible off system. Funded 80 federal/20 state. 82746~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - Geological Site Management 4SF7(90% Federal) / 4SS7(10% State) - No CAP - Slip repair above Gue-IR 70-00.09 to 00.12 112765~|~1~|~1~|~01/S<2~|~Asphalt resurfacing from SLM 11.98 to SLM 12.42 and from SLM 25.30 to SLM 26.02. 112765~|~1~|~2~|~02/STR~|~Asphalt resurfacing from SLM 12.42 to SLM 25.30. 87314~|~1~|~2~|~02/S<2~|~Resurfacing of SR 45 from SLM 0.2 ot 0.88 in the urban area of East Liverpool 87314~|~1~|~1~|~01/STR~|~Resurfacing on SR 45 from SLM 0.858 to 8.95 101347~|~1~|~1~|~01/STR~|~bridge rehab. 89374~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Addressing soft base material at 1) MUS SR83 6.42-6.46; 2) MUS SR83 6.61-6.65; 3) MUS SR83 6.8-6.84 109309~|~1~|~1~|~01/NHS~|~Rehabilitate Structure JEF-7-1369 (SFN 4100751) via superstructure replacement and conversion to semi-integral abutments. Abutment and Pier Cap repairs will be performed, Bearings will be replaced. 106985~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - City of Zanesville resurfacing project using 4TA7 funds on Dresden Road (CR 2) from 0.00 to 1.04 95969~|~1~|~1~|~01/NFA~|~01/NFP/OT/ ; Uses 100% LBP7 funds. All work for this project uses this split. 102477~|~1~|~2~|~02/STR~|~Asphalt resurfacing of BEL-331 102477~|~1~|~1~|~01/NFA~|~Resurfacing SR-26 117713~|~1~|~1~|~01/NHS~|~ITS maintenance activities throughout District Six 103662~|~1~|~1~|~01/NFP~|~Mowing various routes in FAY, FRA, MAD, PIC counties 112267~|~1~|~1~|~01/S5K~|~STP 5k-50k plan split for the culvert on PIC-104-15.756. 112267~|~1~|~2~|~02/STR~|~Rural plan split for the culvert on PIC-22-4.815. 112328~|~1~|~1~|~01/SAF~|~JAC-35 (1.79-2.75) Rest StopConsolidate the access points for rest stop and add an acceleration lane. 112328~|~1~|~2~|~02/NFP~|~Mill and fill the rest area parking lot. 112328~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 112718~|~1~|~1~|~01/NHS~|~Replace deck on Lewis Center over I71 and Powell Road 98066~|~1~|~1~|~01/IMS~|~Interstate Bridge Rehab 100% State 117257~|~1~|~1~|~01/STR~|~Culvert Replacement WAS 550 16.24, CFN 1885152. 105502~|~1~|~1~|~01/IMS~|~Lighting replacements on Interstate routes inside the City of Cincinnati. 123934~|~1~|~1~|~01/S5K~|~Slope stabilization along US 22 in Muskingum County. 85360~|~1~|~1~|~01/NHS~|~80/20 funding split for the resurfacing work that is eligible for federal funds 85360~|~1~|~2~|~02/SAF~|~Roadway safety improvements that qualifies for federal-aid 118679~|~1~|~1~|~01/S5K~|~Resurface County Road 33-A 118679~|~1~|~2~|~02/STR~|~Resurface CR 33-A 103101~|~1~|~1~|~01/STR~|~One year fast dry pavement marking contract on various routes 93284~|~1~|~1~|~01/STR~|~District Preservation Bridge Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4202139 KNO SR514 6.48 Intersect: Mohican River; BR Eligible for Rehabilitation & Replacement: Length=400 SD/FO(1) SR=89.7 DSR=4 108633~|~1~|~1~|~01/SAF~|~Construct southbound right turn lane and realign the northbound left turn lane 80997~|~1~|~1~|~01/CMQ~|~MPO CMAQ funds to be used on eligible items of work. 80997~|~1~|~3~|~03/ERD~|~80/20 fed/local earmark to be used as described in the funding bill. 80997~|~1~|~2~|~02/ERD~|~100% earmark to be used as described in the funding bill. 80997~|~1~|~4~|~04/NFP~|~100% local cost --- alternate bid items 96702~|~1~|~1~|~01/NFA~|~ATB Conneaut Outpost, convert cold storage into Coverall, keep existing walls and demolish the rest. Build a cover-all on existing walls to include a fron with an overhead garage door. Existing size approx 50'x55' 95822~|~1~|~3~|~03/NFP~|~Pavement repairs, curb, curb ramps,... items not eligible for Urban Pav. 95822~|~1~|~2~|~02/S<2~|~from SLM 13.89 to SLM 15.38 Urban Pav 95822~|~1~|~1~|~01/NHS~|~From SLM 12.09 to SLM 13.00, then from 13.26 to 13.89.The gap section on SR-18 between 13.00 to 13.26 is under PID 98722. 99004~|~1~|~1~|~01/ENH~|~CBD Enhancement 99004~|~1~|~2~|~02/MPO~|~Plans split for pavement reconstruction 116449~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4. 119797~|~1~|~1~|~01/NHS~|~Repair damage to bridge carrying SR 872 over SR 7 caused by over height vehicle collision. 97570~|~1~|~2~|~02/BRF~|~Replacement of Bridge No. PRE-CR 97-0290 (SFN: 6836348) 97570~|~1~|~3~|~03/BRF~|~Replacement of Bridge No. PRE-CR 97-0300 (SFN 6830242). 97570~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. PRE-CR 21-0945 (SFN: 6830374) in Preble County. 96921~|~1~|~1~|~01/NFP~|~New County Full Service Maintenance Facility 93461~|~1~|~7~|~07/S>2~|~Bridge deck sealer treatment on: SFN 5703645 MOT-048-1214 93461~|~1~|~6~|~06/S<2~|~Bridge deck sealer treatment on: SFN 1206249 CLA-571-0024/SFN 1201115 CLA-040-1396/SFN 1201700 CLA-041-2067L/SFN 1201085 CLA-040-1380 93461~|~1~|~3~|~03/NHS~|~Bridge deck sealer treatment on: SFN 5701619 MOT-035-1395R/SFN 5701600 MOT-035-1395L/SFN 5702321 MOT-035-1639S/SFN 5702755 MOT-035-1800S/SFN 5702313 MOT-035-1639R/SFN 5712998 MOT-035-1441/SFN 1101773 CHP-068-0066L/SFN 1101803 CHP-068-0066R/SFN 1101838 CHP-068-0119L/SFN 1101846 CHP-068-0119R/SFN 5700280 MOT-004-0712/SFN 5700183 MOT-004-0238/SFN 1200364 CLA-004-1102R/SFN 1203061 CLA-068-1138L/SFN 1203096 CLA-068-1138R 93461~|~1~|~4~|~04/BRO~|~Bridge deck sealing treatment on: SFN 5701899 MOT-035-1566/SFN 5704073 MOT-049-0275 93461~|~1~|~5~|~05/STR~|~Bridge deck sealer treatment on: SFN 1102834 CHP-559-0390/SFN 1101498 CHP-055-0624/SFN 1100203 CHP-004-0974/SFN 1203185 CLA-068-1274L/SFN 1203215 CLA-068-1274R/SFN 1203304 CLA-068-1309L/SFN 1203339 CLA-068-1309R 93461~|~1~|~2~|~02/IMS~|~Bridge deck sealer treatment on: SFN 1204777 CLA-070-1832L/SFN 1204807 CLA-070-1832R/SFN 1204629 CLA-070-1576R/SFN 1204599 CLA-070-1576L/SFN 5705231 MOT-070-0719/SFN 1203967 CLA-070-0634R/SFN 1204920 CLA-070-2015/SFN 1203932 CLA-070-0634L. 93461~|~1~|~1~|~01/BRO~|~Bridge deck sealing treatment on SFN 5704502 MOT-049-1091L 87226~|~1~|~1~|~01/STR~|~Brdg Prelacement. 6.26 miles east of the Brown County line. 0101745 ADA US52 6.28 Intersect: Bradford Run80 Fed/20 State. 01/STR/BR/State 109302~|~1~|~1~|~01/SAE~|~Install new guardrail for fixed object protection 109350~|~1~|~2~|~02/SAF/WIL~|~Replacement of existing city water line along SR 73. 109350~|~1~|~1~|~01/SAF~|~Convert signalized intersection at SR-380 to an intersection with turn lanes and keeps the signal. 94907~|~1~|~2~|~02/STR~|~D6 funding for replacement of existing storm sewer which is within RW 94907~|~1~|~3~|~03/S<2~|~Paving from the beginning of the project to Lambert Rd 94907~|~1~|~1~|~01/STR~|~D6 funding to resurface FRA-62, SLM 1.65-2.97 82749~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Slip repair beneath the roadway on Gue-SR 265-15.54 to 15.56 103364~|~1~|~1~|~01/SAE~|~100% 4HB7 federally funded pavement markings. 87806~|~1~|~1~|~01/NFA~|~Bridge replacement project. Replace existing 3 span structure over Federal Creek. Includes 200 L.F. of new roadway at the west approach. SFN 0545457. 80% Federal/15% Credit Bridge (also Federal) and 5% Local. 103534~|~1~|~1~|~01/NFA~|~The County is constructing improvements to CR 140 and TR 420 specifically the roads will be widened from the current 19 feet to 24 feet to better accommodate the increased traffic as well as the additional truck traffic on both roads. 112875~|~1~|~1~|~01/S>2~|~MAD-40 from SLM 15.92 to 16.14 112875~|~1~|~2~|~02/STR~|~MAD-40 from SLM 7.86 to 15.92 98166~|~1~|~1~|~01/NHS~|~Plan Split for Rockfall/ Bench Cleaning. 120850~|~1~|~1~|~01/CMQ~|~Extend existing paths in Lick Run and new multi use paths connecting to existing trails 110422~|~1~|~1~|~01/SAE~|~Construct an RCUT intersection at SR-32 & Bauer Road and evaluate improvements at the intersection of SR-32 & Herold. 110422~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 85139~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of CLI-22 within the project limits. The section is between SLM 12.57 to 22.92 85139~|~1~|~2~|~02/STR~|~Replace small culverts CLI-22-1389 and CLI-22-2235. 93061~|~1~|~1~|~01/SAE~|~This event is for safety work eligible for 100% federal funds. The funds are from the City of Findlay budget. 124235~|~1~|~1~|~01/IMS~|~Plan split for bridge replacement work 106112~|~1~|~1~|~01/S<2~|~DSR JEF-001 95799~|~1~|~1~|~01/STR~|~from SLM 15.09 to SLM 19.47 122798~|~1~|~1~|~01/MPO~|~Installation of EV chargers for the City of Oxford 100782~|~1~|~1~|~01/STR~|~AC Overlay w/repairs SR 66 in Auglaize County AUG SR 66 SLM 5.62 to 9.36 100782~|~1~|~2~|~02/S<2~|~AC Overlay w/repairs SR 66 in Auglaize County AUG SR 66 SLM 4.57 to 5.62 AUG SR 66 SLM 9.36 to 10.69 100782~|~1~|~3~|~03/SAF~|~Adding extra rumble strips 121305~|~1~|~1~|~01/ERD~|~Improvements for pedestrians and cyclists along Central Parkway by completing a road diet, adding curb bump outs, installing a bike lane, etc. 118967~|~1~|~1~|~01/NHS~|~plan split. 93914~|~1~|~1~|~01/SAF~|~100% federal funding up to funding cap to provide sidewalks, stand back area, curb ramps, crosswalks 100491~|~1~|~1~|~01/STR~|~JAC SR 93 8.60-13.61 100491~|~1~|~2~|~02/S<2~|~JAC SR 93 13.61-13.67 100491~|~1~|~3~|~03/NHS~|~JAC SR 93 13.67-14.29 100491~|~1~|~4~|~04/NHS~|~JAC SR 93 13.88 (SFN 4000951) 88976~|~1~|~1~|~01/NHS~|~JAC US35 1.69 - 8.35 Resurfacing ProjectOn US35 it is proposed to begin resurfacing the highway 1.69 miles (SLM1.69) east of the Ross/Jackson Co. line and continure to east for 6.66 miles (SLM 8.35).80/20 split01/NHS/PV/State 120681~|~1~|~1~|~01/BRF~|~rehabilitate Felicity Cedron Rd. Bridge (SFN 1358502) 116967~|~1~|~1~|~01/S>2~|~Transportation Improvements - Parking, lights, curb, sidewalk 117523~|~1~|~1~|~01/ENH~|~Sidewalk replacement and additions along various roads in Village of Magnolia utilizing Federal TAP (4B37) funds at 95%. 104845~|~1~|~1~|~01/NFP~|~Construct combination MS/CS building 106117~|~1~|~1~|~01/NFP~|~VGCS bridge 107211~|~1~|~1~|~01/ENH~|~Rehab of historic Cemetery Bridge in the Village of Poland. 93415~|~1~|~1~|~01/IMS~|~LUC IR475 0-8.98 94526~|~1~|~1~|~01/BRO~|~Remove and replace mainline structures over U.S. 68. Replace culvert carrying Mill Creek. SFN 1204238 CLA 70 11.01 R 94526~|~2~|~2~|~02/IMS~|~Remove and replace mailine structures over U.S. 68. Replace culvert carrying Mill Creek. SFN 1204262 CLA 70 1128 and SFN 1204203 CLA 70 1101 L. 94500~|~1~|~1~|~01/NFP~|~100% State Funds for district wide auxiliary pavement marking. 109284~|~1~|~1~|~01/STR~|~For resurfacing work on CR 122 which is classified as a Rural Major Collector. 80% federal funds and 20% local funds. Funds needed if cap is exceeded will be 100% local funds. 109284~|~1~|~2~|~02/NFA~|~For resurfacing work on CR 134 which is classified as a Rural Minor Collector. 80% federal funds and 20% local funds. Funds needed if cap is exceeded will be 100% local funds. 95487~|~1~|~1~|~01/CMQ~|~Construct a multi-use trail to improve access to the existing east-west bikeway parallel to Austin Boulevard and the Great Miami River Trail. 107134~|~1~|~1~|~01/BRO~|~Bridge replacement with 95% CEAO LBR (4B87) and 5% Local (LNTP) funds. 111509~|~1~|~1~|~01/MPO~|~TMACOG funded items 109645~|~1~|~1~|~01/STR~|~Resurfacing CAR-9 87286~|~1~|~1~|~01/IMS~|~Resurfacing of SUM IR 271 from 6.62 to 8.54. 87286~|~1~|~2~|~02/IMS~|~See linked structures > 20' span. 87286~|~1~|~3~|~03/NHS~|~See linked structure > 20' span. 120995~|~1~|~1~|~01/NHS~|~Resurfacing on a portion of HAM-126 104852~|~1~|~1~|~01/NFA~|~The City will construct a new two lane road starting at Latchaw Drive and heading north about 1,500' terminating at the property of an existing industrial customer 116747~|~1~|~1~|~01/STR~|~Resurfacing. 116747~|~2~|~2~|~02/STR~|~Parking area at the Berlin causeway. 116747~|~1~|~3~|~03/STR~|~Minor bridge work. 75630~|~1~|~1~|~01/STR~|~Replace Bridge No. WAR-123-1296, SFN: 8304351. Bridge carries SR 123 over a Tributary of Halls Creek. 92162~|~1~|~1~|~01/S<2~|~A small city funded project to reconstruct and widen linfoot in the City of Wauseon. FUL SR2 0-0.51 121172~|~1~|~1~|~01/NFP~|~crack sealing plan split. 115742~|~1~|~1~|~01/S>2~|~Plan Split for the 80/20 items on the Urban paving on HAM-561 115742~|~1~|~2~|~02/S>2/CIN~|~Plan Split for the 100% City portion of the project. 101938~|~1~|~1~|~01/ENH~|~SRTS Wadsworth on Sunset and Stratford. 101987~|~1~|~1~|~01/NFA~|~Resurfacing project. GAL CR 60 0.00-3.89. 80% Federal Lands Access Program (FLAP) funds and 20% Local. 121819~|~1~|~1~|~01/S50~|~Asphalt Concrete Overlay with Repairs including bridge maintenance (Fed/Local Split) ERI-4-10.590 to 12.202 121819~|~1~|~2~|~02/S50~|~Asphalt Concrete Overlay with Repairs (100% Local Split) ERI-4-10.590 to 12.202 119121~|~1~|~1~|~01/S>2~|~Resurfacing. 119121~|~1~|~2~|~02/STR~|~Resurfacing. 122289~|~1~|~1~|~01/IMS~|~Plan Split for the reconstruction of IR-480 entrance ramps at Ridge Rd 114800~|~1~|~1~|~01/STR~|~Rural Plan split 110494~|~1~|~1~|~01/STR~|~plan split for pavement work in the rural section of CLE-232 110494~|~1~|~2~|~02/NFA~|~plan split for pavement work in the non federal sections of CLE-232 99483~|~1~|~1~|~01/BRF/GUER~|~"01/BR/BRF/GUER" - Guernsey County Bridge replacement on County Road-utilizing CEAO funds federal/state exchange 108363~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall. 102729~|~1~|~1~|~01/IMS~|~This plan split is for bridge rehab on Interstate bridge. 105908~|~1~|~1~|~01/IMS~|~Plan split for interstate bridge work 105908~|~1~|~2~|~02/NHS~|~Plan split for NHS bridge work 114063~|~1~|~1~|~01/S<2~|~Plan split for federally eligible construction related expenses within federal cap. 102629~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Plan Split 1 for Kno-13-20.88 to 23.11 102629~|~1~|~2~|~02/STR~|~"02/STR/PV/ " plan Split 2 for Kno-95-5.69 to 11.50 and Kno-546-00.00 to 02.15 105496~|~1~|~1~|~01/IMS~|~Plan Split for bridge over I 70 101569~|~1~|~1~|~01/S<2~|~Repair bridge by patching abutments and deck edges using anodes, and encasing piers 101569~|~1~|~2~|~02/STR~|~Repair bridge by patching abuments and deck edges using anodes and encasing piers 120571~|~1~|~1~|~01/NHS~|~Plan split for 80/20 items within the NHS portion of the project 120571~|~1~|~2~|~02/NHS~|~Plan Split for the 100% City items on the NHS section of BUT-122 120571~|~1~|~3~|~03/S5K~|~Plan Split for 80/20 - ODOT/City - the urban portion of BUT-122 120571~|~1~|~4~|~04/S5K~|~Plan Split for the 100% Local items on the small urban section of BUT-122 84597~|~1~|~1~|~01/NHS~|~Resurfacing US422 from SLM 7.61 to SLM 10.14, Mahoning County, Ohio. 110537~|~1~|~1~|~01/STR~|~Microsurfacing on: BUT-126 SLM 0.00 to 7.66 120205~|~1~|~1~|~01/SAF~|~Various safety improvements along SR 314 95306~|~1~|~1~|~01/ENH~|~This project consits of the installation of bike lanes on Wayne Avenue (CR 85) and Fourth Street (CR 629). 110414~|~1~|~1~|~01/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation for various structures along SR 79 and SR 16. 88939~|~1~|~1~|~01/IMS~|~IR77 24.20-28.37 88939~|~1~|~2~|~02/IMS~|~Minor rehab > 20' span. 118867~|~1~|~1~|~01/STR~|~Resurfacing SR 331 and SR 799 113037~|~1~|~1~|~01/S>2/AKRO~|~Resurfacing of SUM SR 261, urban paving in the City of Akron. 113037~|~1~|~3~|~03/S>2/NORT~|~Resurfacing, urban paving in the city of Norton. 113037~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance. 113037~|~1~|~2~|~02/S>2/AKRO~|~Full and partial depth repairs, ADA curb ramps and guardrail repair/replacement. 113037~|~1~|~4~|~04/S>2/NORT~|~Full and partial depth repairs, ADA curb ramps and guardrail repair/replacement. 113102~|~1~|~1~|~01/SAF~|~Safety Sign plan split 87351~|~1~|~1~|~01/NHS~|~Priority system preventive maintenance on COL-30-25.09 to 28.03; includes thin hot mix asphalt overlay, pavement marking 110102~|~1~|~1~|~01/STR~|~Repair/replace culverts on rural routes. 110102~|~1~|~2~|~02/IMS~|~Repair/replace culvert on Interstate Route. 110102~|~1~|~3~|~03/S5K~|~Repair/replace culvert on small urban route. 103137~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY21 Construction Engineering Services 103137~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY22 Construction Engineering Services 100826~|~1~|~1~|~01/NHS~|~Rehabilitate bridge GRE-235-1075 by zone painting, replacing bearings, and updating guardrail. Rehabilitate bridge GRE-235-110 by replaing the existing superstructure. 116799~|~1~|~1~|~01/S>2~|~Split for resurfacing work 104679~|~1~|~1~|~01/NFA~|~Bridge ReplacementADA CR 1B 17.28 (0130060) 105182~|~1~|~1~|~01/NHS~|~AC overlay without repairs on NHS route 105182~|~1~|~2~|~02/STR~|~AC overlay without repairs on rural routes 98259~|~1~|~2~|~02/ENH/GRAN~|~Construction of multi-use pathway along SR 16/CR 539B 98259~|~1~|~3~|~03/NHS~|~Widening of Roadway and ramps for interchange improvement 98259~|~1~|~1~|~01/NHS~|~Bridge replacement/rehabilitation 88890~|~1~|~1~|~01/S<2~|~Resurfacing MAH SR 165 from 0.00 to 1.65. 88890~|~1~|~2~|~02/S<2~|~See linked structure. 107731~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - GSM Funds CAPPED at $150,000 - 80% Federal (4SF7) / 20% State (4SS7) - repair of embankment slope near KNO-13-15.19. 104662~|~1~|~1~|~01/NFA~|~See linked structure. 105057~|~1~|~1~|~01/ENH~|~Construction of a 10 foot wide asphalt multi-use trail between US-27 to SR-73 on the southeast side of Oxford. 95434~|~1~|~1~|~01/STR~|~Repair mine subsidence by excavating out unstable material and replacing roadway. 92258~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Pavement marking costs for the resurfacing on: 1) Per-SR 37-15.02 to 20.69; 2) Per-SR 13-17.49 to 19.83; 92258~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Per-SR 37-15.02 to 20.69; 2) Per-SR 13-17.49 to 19.83; 88826~|~1~|~1~|~01/STR~|~Bridge Replacement - RIC-042-0102 - sfn:7002580 116147~|~1~|~1~|~01/MPO~|~Resurfacing Hallett from 5.124 to 5.443 - Pavement, sidewalks, curb, curb ramps, etc. - No Bridge Work 116147~|~2~|~2~|~02/MPO~|~Widening of existing bridge over Ai Creek to accommodate pedestrian access. 116147~|~1~|~3~|~03/NFP~|~Plan Split for 100% locally funded scope items, including proprietary products and locally requested drainage improvements. 104837~|~1~|~1~|~01/IMS~|~Split for lighting upgrade on the interstate system 104837~|~1~|~2~|~02/NHS~|~Split for lighting upgrade work on US-422. 119736~|~1~|~1~|~01/NFA~|~Created for J&C involvement 102825~|~1~|~1~|~01/S>2~|~Applying smooth seal to STP > 200000 routes 102825~|~1~|~2~|~02/STR~|~Applying smooth seal to various STP Rural routes 92509~|~1~|~1~|~01/NFP~|~Long Line Pavement Markings in POR, STA and SUM Counties 119366~|~1~|~1~|~01/S>2~|~Reconstruction & Roadway Improvements 96253~|~1~|~1~|~01/NFA/BREM~|~"01/NFA/OT/BREM" - Safe Routes To School (SRTS) Funding 4SC7 (80% Federal) / 4BG7 (20% Local) - CAP of $340,000.00 with Toll Revenue use Authorized - Addition of side walks within the Village of Bremen. 96253~|~1~|~2~|~02/NFA/BREM~|~"02/NFA/OT/BREM" - Safe Routes To School (SRTS) Funding 4SC7 (80% Federal) / 4BG7 (20% Local) - CAP of $1,910.00 with Toll Revenue use Authorized - On-Going Design Services During Construction for Addition of side walks within the Village of Bremen. 103710~|~1~|~1~|~01/STR~|~SCI 73 6.38 safety project. 111560~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split for City of Columbus: FRA-710-0.00-1.56 111560~|~1~|~2~|~02/S>2~|~City of Columbus (100% Work Items) 94492~|~1~|~3~|~03/ENH~|~Project includes the reconstruction of the transportation network in the South Fairmount neighborhood of Cincinnati. The project converts Westwood Avenue to two-way from Queen City Avenue, west of White Street, to the Western Hills Viaduct project. Westwood Avenue widens to a seven lane boulevard with walls, sidewalk, and shared use path. The project modifies all side streets on Westwood that are affected by the widening. Queen City Avenue converts to two-way from White Street to Beekman Street. 94492~|~1~|~1~|~01/S>2~|~Westwood Avenue: from approximately 500 feet west of White Street to Harrison Avenue Project includes the reconstruction of the transportation network in the South Fairmount neighborhood of Cincinnati 94492~|~1~|~2~|~02/S>2~|~Project includes the reconstruction of the transportation network in the South Fairmount neighborhood of Cincinnati. The project converts Westwood Avenue to two-way from Queen City Avenue, west of White Street, to the Western Hills Viaduct project. Westwood Avenue widens to a seven lane boulevard with walls, sidewalk, and shared use path. The project modifies all side streets on Westwood that are affected by the widening. Queen City Avenue converts to two-way from White Street to Beekman Street. 123116~|~1~|~1~|~01/NHS~|~Bridge painting project. HOC 33 10.94 R (SFN 3700577) and L (SFN 3700542). 119920~|~1~|~1~|~01/BRO~|~PROTECT bridge substructures from scour by installing Rock Channel Protection along forward abutment. 116053~|~1~|~1~|~01/NFP~|~Plan split for bridge operations 84396~|~1~|~2~|~02/S>2/Akrn~|~Construction and reconstruction of sanitary sewer and waterline that is not Federally eligibile. 100% City of Akron expense. In the City of Akron, Summit County, Ohio. 84396~|~1~|~1~|~01/S>2/Akrn~|~Roadway reconstruction that includes curb and gutter reconstruction, applying pavement markings, installing traffic signals and equipment, in the City of Akron, Summit County, Ohio. 122477~|~1~|~1~|~01/S50~|~All work included in this split. 108758~|~1~|~1~|~01/NHS~|~Culvert repair project using a liner as the treatment. ATH US 33 8.56-8.59. Funds are 80% Federal and 20% State. 117911~|~1~|~1~|~01/IMS~|~NEVI Phase 1 I-71-D, WAY, MED 204-218 107803~|~1~|~1~|~01/STR~|~Landslide repair project on ATH SR 329 5.10-5.15. 100% Federal ER funds. 118184~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 724 1.10, Structural File Number 6105035. Funded 100% State. 110400~|~1~|~1~|~01/STR~|~Resurfacing SR 212 83107~|~1~|~4~|~04/NFA~|~ODNR Public Access Roads 4BF7 (100% State) - No CAP - Resurfacing of drive and parking lot areas within Senecaville Fish Hatchery. 83107~|~1~|~1~|~01/NFA~|~District Preservation Pavement Program using 4PS7(100% State) - No CAP - Resurfacing with related work on 1) Gue-313-2.23 to 9.91; 2)Gue-285-8.49 to 9.47; 83107~|~1~|~2~|~02/STR~|~District Preservation Pavement Program using 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Gue-40-16.19 to 16.62; 2)Gue-285-0.00 to 7.92; 3) Gue-285-8.35 to 8.49; 4) Gue-313-9.91 to 11.39; 5) Gue-313-11.39 to 15.02; 6) Gue-313-15.02 to 15.54; 7) Gue-313-15.54 to 20.99; 83107~|~1~|~3~|~03/NFA~|~Lands and Buildings District Maintenance Project Funding LBM7 (100% State) - No CAP -Resurfacing with repairs at Old Washington Outpost. 119950~|~1~|~1~|~01/STR~|~added plan split. 102501~|~1~|~1~|~01/STR~|~Resurfacing SR 39 and SR 43 86675~|~1~|~2~|~02/BRO~|~Replace deficient bridge decks with minimal approach transitions. Both structures are part of the I-75/US 35 interchange. SFN 5707595 MOT-75-1180. 86675~|~1~|~1~|~01/BRO~|~Replace defiecient bridge decks with minimal approach transitions. All structures are part of IR 75/US 35 interchange. SFN 5707501 MOT-75-1175. 100911~|~1~|~1~|~01/STR~|~Rehabr or replace various culverts in Butler and Warren Counties. 100911~|~1~|~2~|~02/NHS~|~Repair culverts on NHS route. 100911~|~1~|~3~|~03/S>2~|~Repair or replace culvert on Large Urban route. 21631~|~2~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Replace decks, backwall, new approach slabs, paint structure, new expansion joint, replace bearings and railing on: 1) Gue-IR 77-14.74L (SFN 3003248); 2) Gue-IR 77-14.74R (SFN 3003272); 3) Gue-IR 77-15.48R (SFN 3003337); 21631~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing with related work on Gue-IR 77-11.70 to 17.70 21631~|~2~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Priority System Deck Sealing on: 1) Gue-IR 77-15.49 (SFN 3003329); 2) Gue-SR 541-08.40 (SFN 3006212); 3) Gue-CR 633-00.68 (SFN 3003213); 4) Gue-TR 8360-00.18 (SFN 3003361); 84449~|~1~|~1~|~01/BRO~|~3602435 HIG SR134 10.6 Intersect: Little North Fork BR Eligible. 80 fed/20 state 01/BRO/BR/State 93941~|~1~|~1~|~01/NFP~|~100% state funds (4mp7) for district wide rpm replacement. 95166~|~1~|~3~|~03/NFP~|~For all non eligible Urban Paving Items (Sidewalks, full depth, curbs,..) 95166~|~1~|~2~|~02/STR~|~SFN:2600919 95166~|~1~|~1~|~01/STR~|~Resurface FUL-66 from SLM 1.34 to SLM 1.97 101428~|~1~|~1~|~01/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - Bridge Cleaning and Sweeping on Interstate Routes 101428~|~1~|~2~|~02/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on NHS Routes 101428~|~1~|~3~|~03/S<2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Urban Routes 101428~|~1~|~4~|~04/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Rural Routes 101428~|~1~|~5~|~05/NFA~|~District Preservation Bridge Program - 4PS7 (100% State) - Bridge Cleaning and Sweeping on NOFAS-Rural Routes 79740~|~1~|~1~|~01/NHS~|~District Allocation 79740~|~1~|~2~|~02/NHS~|~Bridge work :RIC-US-30 14.100 (R) - Deck Sealing (051)RIC-US-30 14.110 (L) - Deck Sealing (051)RIC-US-30 17.540 (L) - Deck Patching (Concrete)(049), Deck Sealing (051)RIC-US-30 17.540 (R) - Deck Sealing (051) 111225~|~1~|~1~|~01/NFA~|~Reconstruction and extension of Bailey Court East Road in Jackson Township, Mahoning County, Ohio. 105428~|~1~|~1~|~01/IMS~|~Plan Split for I670 Bridges 100391~|~1~|~1~|~01/SAF~|~Various intersections. 105090~|~1~|~1~|~01/IMS~|~Project entails replacing concrete channel protection panels along IR71 Duck Creek. 110644~|~1~|~1~|~01/NHS~|~Resurfacing. Bust in Ellis inventory, SLM 1.83 to 2.64 is actually the General System and is being corrected in the roadway inventory. This is no Urban System on that segment. 105286~|~1~|~1~|~01/STR~|~Resurfacing SR 9 124984~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 542 over Delroy Creek. 116091~|~1~|~1~|~01/NFP~|~All work in this project. 80987~|~1~|~1~|~01/ERD~|~80/20 fed/local split for earmark funds. 97865~|~2~|~2~|~02/STR~|~"02/STR/OT/ " - Geological Site Management Funding 4SF7 (80% Federal) / 4SS7 (20% State) - CAP $164,000.00 for CO & CE - Backslope Repair on Kno-US 62-22.30 to 22.34 97865~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management Funding 4SF7 (90% Federal) / 4SS7 (10% State) - CAP $297,000.00 for CO & CE - Backslope Repair on: 1) Gue-IR 77-13.16 to 13.18; 2) Gue-IR 77-19.99 to 20.01; 114155~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2027. 100366~|~1~|~1~|~01/NHS~|~SAN-6- 6.78 to 12.99 120959~|~1~|~1~|~01/STR~|~Resurfacing. 120959~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance. 120959~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 120959~|~1~|~4~|~04/STR~|~Bridge preventive maintenance 10' to 20' span. 102907~|~1~|~1~|~01/NHS~|~NHS Portion US20A from slm 2.23-3.97 102907~|~2~|~2~|~02/S>2~|~Other Federal (non-NHS) portion of US 20A from SLM 3.97-10.27 91867~|~1~|~1~|~01/NHS~|~Resurface and perform pavement repair on a portion of SR 32 in Clermont County between I-275 and the eastern Batavia Corp. 117658~|~1~|~2~|~02/ENH~|~TAP/Safety (Enhancements) and OPWC funding for sidewalk replacements, including the attached curb, curb ramps, and other necessary associated work. 117658~|~1~|~1~|~01/S5K~|~Plan Split for pavement work necessary to install curb-attached sidewalks. Includes lowering profile of roadway by removing 8" of existing pavement, resurfacing, repairs, new curb and gutter, MOT and incidentals. Funding sources are ODOT District Allocation, TAP/Safety, OPWC, and Village. 24452~|~1~|~1~|~01/BRF~|~"01/BRF/BR/COL" - CR 428 6.65 in St. Clair Twp. - Replace bridge over Little Beaver Creek; relocate ~1400' of roadway both vertically and horizontally, guardrail, signing and striping. All work to be paid for with bridge funds per CEAO. 117267~|~1~|~1~|~01/NFP~|~Split added 105545~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the superstructure and abutments on SFN 6403603 Per-SR 669-12.47 carrying SR 669 over Moxahala Creek 96643~|~1~|~1~|~01/IMS~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 77 0.00-1.56 Northbound and WAS 77 13.19-17.64 Northbound. IR route funded 90% Federal/10% State. 116177~|~1~|~1~|~01/SAF~|~Guardrail upgrades utilizing CEAO HSIP (4HB7) funding at 100%. 84015~|~1~|~1~|~01/BRO~|~Replace superstructure on box beam bridge (BEL-148-1651, SFN 0704334). Substructure units (Pier Caps) will also need to be replaced. 96822~|~1~|~1~|~01/NFP~|~Two year mowing of interstates and interstate look-a-likes in ATB, MAH and TRU Counties. 85005~|~1~|~1~|~01/CMQ~|~Plan Split for MAH Metroparks Bikeway Phase 3 102068~|~1~|~1~|~01/NHS~|~Slide repair 90938~|~1~|~1~|~01/STR~|~District Allocation 90938~|~1~|~2~|~02/STR~|~Not project eligible?water service connections which will be reimbursed by the Medina County Water & Sewer District 101986~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Ashtabula, Mahoning, and Trumbull Counties. 110967~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 5.64-5.68. Rural federal aid funded 100% State ER. 112294~|~1~|~1~|~01/STR~|~Bridge Repairs 119436~|~1~|~1~|~01/IMS~|~Plan Split for the pavement work 98314~|~1~|~1~|~01/SAF~|~Flat Sheet sign replacement project in FY2024. Routes and sections in MOE county. Funded 80 federal/20 state. 94359~|~1~|~1~|~01/STR~|~On SR93, 4.49 miles south of the Jackson County line, it is proposed to rebuild and stabilize the existing slope to stop the horizontal and vertical movement.80/20 split01/STP/OT/State 118419~|~1~|~1~|~01/NFA~|~Bridge rehabilitation on GUE 761 2.21 (SFN 3006751) 8936~|~1~|~1~|~01/NHS~|~4800664 LUC US20 11.58 Intersect: Hill Ditch 101196~|~1~|~1~|~01/STR~|~Bridge work funded with rural STP funds. Funding 80% federal and 20% state funds from the District Preservation Program, 101196~|~1~|~2~|~02/IMS~|~Bridge work on the Interstate. Funding 90% federal and 10% state funds from the District Preservation Program, 101196~|~1~|~3~|~03/NHS~|~Bridge work on the NHS. Funding 80% federal and 20% state funds from the District Preservation Program, 101196~|~1~|~4~|~04/NFP~|~Work on structures that do not meet the federal definition of a bridge. Funding 100% state funds from the District Preservation Program, 124017~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs ASD-71-0.00 to 8.932 including bridge maintenance 100931~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete on rural routes: DAR SR 49A SLM 1.84 to 2.87 DAR SR 121 SLM 4.74 to 5.80 DAR SR 726 SLM 4.00 to 4.33 103832~|~1~|~1~|~01/STR~|~Replace turn lane on STP rural route. 107838~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 3.90-3.94. 100% Federal ER funding. 105423~|~1~|~2~|~02/SAF~|~Reconfigure the interchange US 35 SLM 18.69 to 19.30 105423~|~1~|~1~|~01/SAF~|~Bridge repair in conjunction with reconfigure the interchange. 105423~|~1~|~3~|~03/NHS~|~Guardrail repair due to accident. 82678~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an asphalt overlay treatment with repair. VIN 32 4.29-7.67. NHS roadways funded 80 federal/20 state. 87218~|~1~|~1~|~01/NHS~|~Rehabilitate bridges GRE-35-0963L&R (sfns 2900602 & 2900637)over Glady Run by replacing the rigid wearing surface, backwalls, approach slabs, bearings, and other minor rehabilitation items. Rehabilitate bridge GRE-380-0671 (sfn 2902494) over US 35 by replacing the rigid wearing surface, parapets, abutment bearings, and other minor rehabilitation items. 115620~|~1~|~1~|~01/IMS~|~MOWING 101442~|~1~|~1~|~01/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): RIC SR309 SLM 03.910 TO 06.100RIC SR430 SLM 0.000 TO 2.190 101442~|~1~|~2~|~02/S<2~|~100% Local (Ontario): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): RIC SR309 SLM 03.910 TO 06.100RIC SR430 SLM 0.000 TO 2.190 101442~|~1~|~3~|~03/BRO~|~Bridge Work RIC 309 0558SFN: 7001843Concrete Patching (Non-Deck) Patch and Waterproof underside. 101442~|~1~|~4~|~04/MPO~|~Fabric Material used on Ontario Urban paving project paid for with $240,000 4TA7 80%/ 4BG7 20% (RCRPC). 86211~|~1~|~1~|~01/STR~|~Replace UNI-4-17.26 bridge8000212 UNI SR4 17.26 Intersect: Blues Creek 86211~|~1~|~2~|~02/STR~|~Culvert split. Replace UNI-4-20.54 culvert:8000247 UNI SR4 20.54 Intersect: Clevenger Ditch 119122~|~1~|~1~|~01/S5K~|~Resurfacing. 119122~|~1~|~2~|~02/STR~|~Resurfacing. 92225~|~1~|~1~|~01/NFP~|~100% state plan split for all work. 104886~|~1~|~1~|~01/NFA~|~District wide Bridge Maintenance project. 77918~|~1~|~1~|~01/STR~|~Replace the existing concrete slab of Bridge No. CLI-380-0032, SFN: 1403338. 107300~|~1~|~1~|~01/STR~|~Split for signal upgrade work at US-322 and SR-608 124318~|~1~|~1~|~01/NFP~|~Created for J&C involvement 104705~|~1~|~1~|~01/NHS~|~District Preservation Culvert Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Culvert replacement at: 1) Kno-SR 13-22.82; 2) Kno-SR 13-22.82; 3) Lic-SR 37-07.08; 4) Lic-SR 37-07.08; 104705~|~1~|~2~|~02/STR~|~District Preservation Culvert Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Culvert replacement at: 1) Fai-SR 158-06.17; 2) Fai-SR 158-06.17; 3) Lic-US 62-11.45; 4) Lic-US 62-11.45; 5) Lic-SR 310-11.43; 6) Lic-SR 310-11.43; 7) Per-US 22-08.69; 8) Per-US 22-08.69; 9) Per-US 22-09.75; 10) Per-US 22-09.75; 119672~|~1~|~1~|~01/IMS~|~Construct additional lane in each direction 106202~|~1~|~1~|~01/NFP~|~Lighting improvements at the MAH IR 680/Meridian interchange. 79791~|~1~|~1~|~01/IMS~|~Resurfacing 79791~|~1~|~2~|~02/IMS~|~Bridge Work: MED-71-0.31 (L&R) 101650~|~1~|~1~|~01/NHS~|~Culvert Replacement: ASD-250-10.64 101650~|~1~|~2~|~02/STR~|~Culvert Replacement: ASD-60-12.15 100475~|~1~|~1~|~01/NHS~|~Microsurfacing of BEL-7 116931~|~1~|~1~|~01/NHS~|~Field pave inverts - NHS 116931~|~1~|~2~|~02/STR~|~Field pave inverts 120485~|~1~|~1~|~01/S5K/LANC~|~Resurfacing of routes within City of Lancaster 116495~|~1~|~2~|~02/NFP~|~Pavement repairs and other 100% city items. 116495~|~1~|~1~|~01/S>2~|~Resurfacing-Urban 116495~|~1~|~3~|~03/S>2~|~Resurfacing on SR 303 in township areas and guardrail Items. 102967~|~1~|~1~|~01/STR~|~Microsurfacing on rural routes: DAR SR 121 SLM 9.94 to 14.01 102967~|~1~|~2~|~02/S<2~|~Michrosurfacing on small urban routes: DAR SR 121 SLM 14.01 to 15.18 119923~|~1~|~1~|~01/NHS~|~Project-eligible items. 107228~|~1~|~1~|~01/CMQ/YOUN~|~Upgrade 10 signals within the City of Youngstown. 25592~|~1~|~1~|~01/NHS~|~Priority system paving of FAY-35: 17.41-24.02 25592~|~1~|~2~|~02/NHS~|~Bridge work on 10 structures (not BR eligible):2400510 FAY CR138 18.86 Intersect: Over Cr 138 (Bogus Rd)2400529 FAY CR138 18.86 Intersect: Over Cr 138 (Bogus Rd)2400537 FAY US35 20.4 Intersect: Over Shepards Run2400545 FAY 35 1.5 MI E OF ROSS CO LINEIntersect: OVER MILL RUN2400626 FAY 35 0.48 MI E OF SR753Intersect: OVER GROVE DITCH2400669 FAY US35 21.02 Intersect: Over Indian Camp Run2400685 FAY US35 21.02 Intersect: Over Indian Camp Run2400731 FAY US35 22.74 Intersect: Over Mills Branch2400766 FAY US35 22.74 Intersect: Over Mills Branch2401002 FAY US35 20.4 Intersect: Over Shepards Run 12343~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all bridge work using federal IM funds: 1811797, 1811827 12343~|~1~|~2~|~02/IMS~|~90/10 fed/state funding split for work pavement work using federal IM funds. 116476~|~1~|~1~|~01/S<2~|~Overlay in Ross County. 114574~|~1~|~1~|~01/BRO~|~OH Share 114574~|~1~|~2~|~02/BRO~|~WV Share of the bridge Clean & Paint 95823~|~1~|~1~|~01/S<2~|~from SLM 8.30 to 10.44 105237~|~1~|~1~|~01/S>2~|~Resurfacing. 114483~|~1~|~2~|~02/S>2~|~Split for urban STP paving 114483~|~1~|~1~|~01/IMS~|~Split for various pavement repairs on interstate. 114483~|~3~|~3~|~03/STR~|~Resurfacing both shoulders on SR 168, 1.5? mill and fill 98365~|~1~|~1~|~01/NHS/BARB~|~Resurfacing Wooster Road from Hopocan Ave to Norton Ave in the City of Barberton, includes full and partial depth repairs. 114536~|~1~|~2~|~02/IMS~|~Plan split for application of protective coating to SFN 1814249 114536~|~1~|~1~|~01/BRO~|~Split for bridge replacement work 117527~|~1~|~1~|~01/NFP~|~Plan Split to resurface roads inside East Fork State Park 122821~|~1~|~1~|~01/MPO~|~80/20 split, 80 %OKI CR Funding with 20% LNTP using TRC. Construction phase is capped at $443,971.00. 121323~|~1~|~1~|~01/NFP~|~Created for TID Involvement 117451~|~1~|~1~|~01/NFP~|~Plan split for repairing GR in D6 in all counties, besides Franklin. 114393~|~1~|~1~|~01/MPO/FAIR~|~Improvements to South Gilmore Road between Mack Road and Planet Drive, including addition of a southbound lane between Flaig Drive and Resor Road. 113766~|~1~|~1~|~01/NFP~|~ODNR Barnesville District Office parking lot paving 109807~|~1~|~2~|~02/SAE~|~Adding edge line rumble strips to one section of roadway on the project. Funded 100% with safety funds. 109807~|~1~|~1~|~01/STR~|~Resurfacing on SR12, SR 613, and SR 115 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). 93297~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO STP funds. 94198~|~1~|~1~|~01/STR~|~General system paving on UNI-42, SLM 0.00-9.89 98383~|~1~|~1~|~01/NHS~|~Resurfacing STA SR 43 from 25.00 to 27.20. 98383~|~1~|~2~|~02/NHS/CANT~|~Resurfacing STA SR 43 from 12.70 to 14.41, urban paving in the City of Canton. 98383~|~1~|~3~|~03/S>2/CANT~|~Resurfacing STA SR 172 from 14.86 to 15.55, urban paving in the City of Canton. 98383~|~1~|~4~|~04/S>2~|~Resurfacing STA SR 619 from 0.00 to 2.06. 98383~|~1~|~5~|~05/IMS~|~Minor bridge work > 20' span. 98383~|~1~|~7~|~07/S>2~|~Minor bridge work > 20' span. 98383~|~1~|~6~|~06/NHS~|~Minor bridge work > 20' span. 98383~|~1~|~8~|~08/S>2~|~Minor bridge work 10' to 20' span. 98383~|~1~|~9~|~09/NHS/CANT~|~100% City of Canton items STA SR 43 from 12.70 to 14.41 including curb ramps, catch basins, and partial depth repairs. 98383~|~1~|~10~|~10/S>2/CANT~|~100% City of Canton items on STA SR 172 from 14.86 to 15.55, including curb ramps, catch basins, and partial depth repairs. 98383~|~1~|~11~|~11/SAE~|~Adding rumble stripes. 96224~|~1~|~1~|~01/STR~|~From SLM 2.46 to 3.05 then from 3.59 to 5.07 117073~|~1~|~1~|~01/IMS~|~Split for bridge work over the interstate 86052~|~1~|~1~|~01/ENH~|~"01/ENH/OT/HCPD" -Construct ~7.65 mi of bikepath including bridge rehab/reconst. From CR 25 in Glenmont to Railroad Depot at CR 622 in Killbuck. Includes a parking facility near Killbuck. Will use earmark funds (OH384) for design. Trail will be 16' wide, plus 2 foot shoulders. Phase 5 B is PID 85365. 95549~|~1~|~1~|~01/MPO~|~MORPC/Columbus funding for widening of Polaris Pkwy 104020~|~1~|~1~|~01/ENH~|~Rehabilitation of the Knowlton Covered Bridge off of MOE TR 384A, that spans the Little Muskingum River. Funded 80 federal/15 TRC/5 local. 108555~|~1~|~1~|~01/NHS~|~Rehabilitate structure carrying US 30 over Westfield Rd by replacing the superstructure. 121747~|~1~|~1~|~01/ENH/AKRO~|~Construction of a shared use trail. 111165~|~1~|~1~|~01/NFP~|~Resurfacing at Fayette Deer Creek State Park 111165~|~1~|~2~|~02/NFP~|~Resurfacing at Stage's Pond Natural Preserve 99545~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 119709~|~1~|~1~|~01/NFA/SHAW~|~Removal of structure (SFN 6460102) 83035~|~1~|~1~|~01/IMS~|~Plan split for Paving of SUM IR 76 0.00 to 6.31 83035~|~1~|~2~|~02/IMS~|~Plan Split to cover pavement markings. 86930~|~1~|~2~|~02/S>2~|~Resurfacing of SR-261 from SLM 3.51 to SLM 3.85 and SLM 4.13 to SLM 5.06 in Franklin Township, Portage County, Ohio. 86930~|~1~|~1~|~01/NHS~|~Resurfacing of SR-59 from SLM 5.86 to SLM 6.83 and SR-43 from SLM 13.21 to SLM 15.59 in Ravenna and Franklin Townships, Portage County, Ohio. 86930~|~1~|~3~|~03/S>2/KENT~|~Resurfacing of SR-261 from SLM 3.85 to SLM 4.13, in the City of Kent, Portage County, Ohio. 86930~|~1~|~4~|~04/BRO~|~Rehabilitation of SFN# 6701264, POR-SR43-14.31 over Norfolk Southern Railroad. 86930~|~1~|~5~|~05/NHS~|~Bridge rehabilitation of SFN# 6701841, POR-SR59-6.05 over Norfolk Southern Railroad, and SFN# 6701213, POR-SR43-13.90 over abandoned Railroad. 86930~|~1~|~6~|~06/S>2~|~Rehabilitation of SFN# 6705111, POR-SR261-4.03 under Bikeway Bridge. 101208~|~1~|~1~|~01/NFP~|~"01/NFA/OT " - District preservation block PID - 4PS7 (100% State) - Block PID for Construction Inspection costs. 122012~|~1~|~1~|~01/SAF~|~Roundabout at West Chester Rd and McCauly Rd 117684~|~1~|~1~|~01/MPO~|~Plan Split for MPO Enhancements funds 93254~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehabilitation on 1602586 COS SR621 1.92 Intersect: Spoon Creek; Not BR Eligible for Rehabilitation: Length=17 SD/FO(1) SR=71.2 DSR=" " 121084~|~1~|~1~|~01/NFP~|~PM FY2029 plan split. 115391~|~1~|~1~|~01/IMS~|~Project Development Process for the currently unused weigh stations in District 3 ASD-IR-71 11.64 / MED-IR-76 05.19 109014~|~1~|~1~|~01/IMS~|~Repair deck edges to connect L&R structures 109014~|~1~|~2~|~02/SAF~|~Improvements to EB on and off ramps and signal upgrades. Extend sidewalk south to connect to sidewalk constructed by Columbus' Hamilton Rd project. 109014~|~1~|~3~|~03/NHS/Cols~|~Items to be funded 100% by the City of Columbus 117328~|~1~|~1~|~01/S5K/MCEO~|~Replacement of MUS-TR 297-0.42 (SFN 6040241) carrying Adams Lane over Joes Run 102337~|~1~|~1~|~01/NFA~|~Replace deficient county bridge. 105240~|~1~|~1~|~01/NFA~|~The LEDC will construct a 3180 linear ft access road with two 12 ft lanes from CR1 through greenwood property northerly to connect to the former Dow site. 113006~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs on the interstate bridges 113006~|~1~|~2~|~02/NHS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs on the NHS bridges 113006~|~1~|~3~|~03/IMS~|~Recent bridge hit repairs on HAM-75-1642E from 1-15-2025 accident. 96214~|~1~|~1~|~01/STR~|~STP Rural 80/20 Fed/State MAR-231-1.04 over Owings Ditch 97506~|~1~|~1~|~01/BRO~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). On the federal aid system. Functional Classification Major Collector. CR 222 (Napoleon Road) Bridge SFN 0238872. 97506~|~1~|~3~|~03/BRF~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). Off the federal aid system. Functional Classification Local. TR 108 (Neely Road Bridge) SFN 0232505 97506~|~1~|~2~|~02/BRF~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). Off the federal aid system. Functional Classification Local. TR 87 (Hook Waltz Road) Bridge SFN 0243329. 123014~|~1~|~1~|~01/NFP~|~Systematic sign upgrades/replacements on various routes throughout District 4. 123306~|~1~|~1~|~01/S>2~|~Ped/Bike path 119772~|~1~|~1~|~01/SAF~|~Curb bump outs and other safety improvements along Ross Avenue 109785~|~1~|~1~|~01/STR~|~Districtwide culvert replacements. 114838~|~1~|~1~|~01/S<2~|~Marysville Urban Area plan split. 114838~|~1~|~2~|~02/STR~|~Rural plan split. 96273~|~1~|~1~|~01/NHS~|~District Allocation 80/20 - Bridge Repairs 120883~|~1~|~1~|~01/STR~|~Plan split for federally eligible DBT costs 123700~|~1~|~1~|~01/STR~|~Plan Split for the Rural Locations 123700~|~1~|~2~|~02/S>2~|~Plan Split for the Large Urban Locations 123700~|~1~|~3~|~03/NFA~|~Plan Split for the not Federal Aid eligible location 97939~|~1~|~1~|~01/S<2~|~Installation of turn lanes, signals/signal upgrades and mill & fill on SR 39 (Mansfield Ave). 97939~|~1~|~2~|~02/S<2/Shel~|~Pavement widening, installation and upgrade of signals. 97939~|~1~|~3~|~03/S<2~|~Paving outside of the Shelby City Limits. 97939~|~1~|~4~|~04/S<2~|~100% local items. 97939~|~1~|~5~|~05/BRO~|~Bridge items, 80/20 Fed/State. 94084~|~1~|~1~|~01/IMS~|~Patch abutments using anodes on SFN 5501989 over Stanley Rench Ditch MIA 75 0623R, and Reface abutments using anodes on SFN 5502314 Over Peters Creek MIA 75 0793R. 98648~|~1~|~1~|~01/SAF~|~RPM. 88417~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 4.81 (SFN 5301149), 4.85 (SFN 5301173) and 5.31 (SFN 5301203). Rural other federal aid funded 100% state. 108584~|~1~|~1~|~01/IMS~|~Plan split for reconstruction including drainage replacement and pavement work. 108157~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAR-4D-0.00-1.43 MAR-309-15.35-15.80 & 17.25-17.57 96254~|~1~|~1~|~01/S>2~|~Widening consisting of revising the existing roadway from 2 lanes to 3 lanes. An 8' sidewalk/bikepath will be constructed on the north side of the road along with burb on both side and storm sewer as needed. Also, the vertical alignment of the roadway will be adjusted to eliminate a low area in the pavement. Chambersburg Road. 90631~|~1~|~1~|~01/NFP~|~This is a barrier sweeping contract using maintenance operating funds. 100018~|~1~|~1~|~01/MPO~|~Wayfinding Signs on Various Streets in Sandusky 105355~|~1~|~1~|~01/NFP~|~Spot paving various locations throughout District 11 82309~|~1~|~1~|~01/IMS~|~Phase 2 work for the I275/SR32 interchnage. Include flyovers to complete the freeflow movement for eastbound SR32 82309~|~1~|~2~|~02/IMS~|~Major New project Complete construction of Phase 2. Primarily IR275 to eastbound SR32 and southside of Eastgate Blvd interchange. 90393~|~1~|~1~|~01/STR~|~Bridge deck replacement on WAS 26 1252 (SFN 8400962). Work includes superstructure and substructure repairs. Federal 80%/State 20%. 117659~|~1~|~1~|~01/IMS~|~Rehabilitation of interstate culverts 117659~|~1~|~2~|~02/NHS~|~Rehabilitation of culverts along NHS routes. 117659~|~1~|~3~|~03/STR~|~Rehabilitation of culverts along STP Rural routes 93046~|~1~|~2~|~02/S<2~|~Resurfacing project on CR 5-0.00 to 0.27, 0.29 to 1.43. Berm work and striping also included. Urban other federal aid funded 80 federal/20 local. 93046~|~1~|~1~|~01/STR~|~Resurfacing project on CR 1-3.74 to 15.46, CR 3-7.17 to 13.56, CR 5- 1.43 to 1.66, 1.67 to 2.25, CR 28-7.40 to 10.53, CR 33A-0.00 to 3.40, CR 41-0.00 to 0.91, CR 42-0.00 to 0.54, and CR 124-0.49 to 0.83 Berm work and striping also included. Rural other federal aid funded Federal 80% and 20% Local. 93046~|~1~|~3~|~03/NFA~|~Resurfacing project on CR 41-0.91 to 0.93 and CR 124-0.83 to 2.86. Berm work and striping also included. Not on any federal aid system. Funded 80 federal/20 local. 111852~|~1~|~1~|~01/BRO~|~KYTC's Share of the painting project. 111852~|~1~|~2~|~02/BRO~|~OH's Share of the painting project. 87718~|~2~|~2~|~02/IMS~|~Rest Area 87718~|~3~|~3~|~03/IMS~|~Bridge Work. 87718~|~1~|~1~|~01/IMS~|~District Allocation 90%-4PF7 /10%-4PS7 Funds. 85342~|~1~|~1~|~01/ENH/Geto~|~On Court House Square, on Apple and Cherry Street, it is proposed to construct a street scape in FY2011. 80% fed/20% local on first funding event & 100% local on 2nd funding event. 92338~|~1~|~2~|~02/NFP/DEF~|~A City of Defiance Monument Sign paid for 100% by the City of Defiance. There is another City of Defiance Monument Sign that will be paid for by the TE program and in in the other split. 92338~|~1~|~1~|~01/ENH~|~01/ENH/OT/ This Plan Split is for work funded through the ODOT Central Office controlled Transportation Enhancement Program. 100156~|~1~|~1~|~01/NHS~|~Adding Lighting and sidewalks to US 422 and SR 616 in Coitsville Township. 115209~|~1~|~1~|~01/NHS~|~AC Overlay w/o Rpr WAY US 250 12.26 - 14.08. 91026~|~1~|~1~|~01/MPO~|~Resurfacing 91026~|~2~|~2~|~02/SAF~|~Turnpike Mitigation Work 104080~|~1~|~1~|~01/BRF~|~Bridge replacement on CR 78 (Kennard) 123730~|~1~|~1~|~01/IMS~|~Plan split for resurfacing on WOO-75 110514~|~1~|~1~|~01/S>2~|~Resurfacing Walbridge Rd. 110514~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 102496~|~1~|~1~|~01/STR~|~1" FGP overlay of CAR-212 114277~|~1~|~1~|~01/IMS~|~Mowing contract in District 8 123482~|~1~|~1~|~01/NHS~|~Resurfacing project using a fine graded polymer overlay. MRG 60 3.34-9.36. 124934~|~1~|~1~|~01/MPO~|~resurface West Kemper Road between Mill and Winton Roads 123923~|~1~|~1~|~01/MPO~|~Resurfacing of Dayton-Xenia Road from Trebein Road to the western City of Xenia corp. limit. 83201~|~1~|~1~|~01/S<2~|~Project consists of widening of Park Avenue from Main Street to Lexington Avenue to accommodate 13 foot lanes; work also includes curb and gutter, storm sewer, sidewalk, railroad signal work, water main work and 100% City sanitary sewer work. 83201~|~2~|~2~|~02/NFP~|~Non-Federal aid items as per plan 104816~|~1~|~1~|~01/S<2~|~Construction Inspection 96679~|~1~|~1~|~01/IMS~|~Minor bridge work to the linked structures > 20' span. 96679~|~1~|~2~|~02/S>2~|~Minor bridge work to the linked structure > 20' span. 120699~|~1~|~1~|~01/IMS~|~Microsurfacing. 107828~|~1~|~1~|~01/STR~|~DEL-47 107828~|~1~|~2~|~02/NFA~|~DEL-229IC 119634~|~1~|~1~|~01/SAF~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%. 121588~|~1~|~1~|~01/NHS~|~Resurfacing 112180~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance. 112180~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance. 112180~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 112662~|~1~|~1~|~01/SAF~|~Replace span wire traffic signal with mast arm supports and vehicle signals with back plates, update pavement markings and signs. 91391~|~1~|~1~|~01/S<2~|~Urban paving in Marysville of SR-38 from Marysville corp to 5th St 91391~|~1~|~2~|~02/S<2~|~100% City of Marysville items. Pavement repair, curb ramps, specialized crosswalks, etc. 116232~|~1~|~1~|~01/NHS~|~FY28 Smoothseal 120763~|~1~|~1~|~01/SAF~|~Intersection Improvement 106505~|~1~|~1~|~01/NFA~|~The Byers Road Connector Project includes the construction of a new 2500 two lane roadway. 100857~|~1~|~1~|~01/NHS~|~Overlay with asphalt concrete SR 4 in Montgomery County 119113~|~1~|~3~|~03/SAF~|~Installation of traffic calming elements and high visibility crosswalks at WAS SR 7 51.13-51.55, 51.88-52.02 and WAS SR 260 0.00-0.05. 119113~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 807 0.00-0.24 and WAS 7 37.23-38.93, 49.43-52.19. Funded 80% Federal/20% State. 119113~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 260 0.00-0.48. Not on the federal aid system funded 100% State. 86588~|~1~|~1~|~01/STR~|~4000811 JAC SR93 0.15 Intersect: Branch Black Fork CreekBrdg replacement01/STR/BR/State 113873~|~1~|~2~|~02/NFA~|~Split for non-eligible safety work. 113873~|~1~|~1~|~01/SAF~|~Split for safety eligible work. 94360~|~1~|~1~|~01/BRO~|~Block PID Funding 119385~|~1~|~1~|~01/S>2~|~Construct Hiker/Bike Path 121304~|~1~|~1~|~01/STR~|~All work is within this split 87212~|~1~|~1~|~01/STR~|~Resurfacing using rural STP funds. Funding from the District Preservation program budget. 80% 4PF7 and 20% 4PS7. 125016~|~1~|~1~|~01/NFA~|~ODNR project to resurface Lake Loramie Park 89323~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - JEF CR74 1.91; Replace bridge over Cross Creek and Dry Fork 0.15 mi S of CR 28. Minor roadway work will be required. We expect an individual Corps permit will be needed for channel relocation. 102798~|~1~|~1~|~01/NHS~|~Micro surfacing NHS routes 102798~|~1~|~2~|~02/STR~|~Micro surfacing STP Rural routes 102798~|~1~|~3~|~03/S<2~|~Micro surfacing STP < 200k routes 102798~|~1~|~4~|~04/IMS~|~Microsurfacing on interstate system 97965~|~1~|~1~|~01/NFA/MCEO~|~"01/NFA/OT/MCEO" - CEAO HSIP Funding 4HB7 (100% Federal) - CAPPed @ $288,500.00 Contract/$11,500.00 (4%) Construction Engineering - Guardrail upgrades along various County Routes in Muskingum County 86217~|~1~|~1~|~01/STR~|~Bridge replacement on SFN 8001626, UNI-36-0.89, over Treacle Creek.Not currently eliglble for BR funding - use STP Rural funds. 100% State. 88280~|~1~|~1~|~01/ENH~|~LAW SRTS Phase 2 - Safe Routes to School Project.Project Termini: City of Ironton Phase 2 SRTS Project Project Description: It is proposed to used SRTS funds to construct sidewalks Thomas Street from Delaware to McPherson (1,140 feet) and on McPherson from 2nd St. to Waldo/Karin Street (1,530 feet). 100% Fed01/ENH/OT/Ironton 100937~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. 101973~|~1~|~1~|~01/BRF~|~Replace bridge over Camp Creek. 117871~|~1~|~1~|~01/S50~|~Culvert repair/replacement 112387~|~1~|~1~|~01/STR~|~Replace existing corrugated metal pipe arch bridge carrying SR 149 over Campbells Run with a new structure. 110609~|~1~|~1~|~01/NHS~|~Plan split for paving work on the NHS 110609~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work using 100% local funds. 112638~|~1~|~1~|~01/MPO~|~Resurfacing of Goldie Rd from SR 193 to 5th Ave in Liberty Township. 104613~|~1~|~1~|~01/BRF~|~Replacement of linked structure. 95289~|~1~|~1~|~01/BRO~|~BLOCK Bridge PID for FY 2025 96003~|~1~|~1~|~01/IMS~|~SFN 8702160 89341~|~1~|~1~|~01/ENH~|~Construction of approximately of 1000' of new bike path. Begin work 3rd Street at existing bikeway to SR7/Greene St near Don Drum Field. Federal/Local Enhancement funds. 120058~|~1~|~1~|~01/NFP~|~Resurfacing park access roads and parking lots in the SUM Portage Lakes State Park. 123729~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance 102959~|~1~|~1~|~01/S>2~|~Plan Split 1 STP>200000 102959~|~2~|~2~|~02/STR~|~Plan split 2 STP Rural 102959~|~1~|~3~|~03/STR~|~Bridge work to be determinded 102959~|~1~|~4~|~04/STR~|~bridge work to be determined later 97946~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete (2.00 in) SR 726 SLM 0.00 to SLM 4.33 110717~|~1~|~1~|~01/STR~|~All work in this plan split using district preservation allocations. 88496~|~1~|~1~|~01/STR~|~Resurface two sections of SR-300, from SLM 0.00 to SLM 2.36, then from SLM 3.51 to SLM 6.33 in Sandusky County. 105759~|~1~|~1~|~01/BRF~|~Plan Split 1 for Federally eligible items 93810~|~1~|~1~|~01/NFP~|~100% State Funds (4MP7) for district wide auxiliary pavement marking. 80133~|~1~|~1~|~01/BRO~|~Replace existing bridge (JEF-150-1017, SFN 4102282) with a new two-span structure using prestressed concrete I-beams with composite concrete deck. 80133~|~1~|~2~|~02/BRO~|~Added funding event for on-going services to be provided by COnsultant during the construction phase of the replacement of the bridge JEF-150-1017. 122507~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes 105201~|~1~|~1~|~01/STR~|~Crack Sealing on the rural sections of BUT-129 and BUT-732 105201~|~1~|~3~|~03/S>2~|~Plan split for the large urban sections on BUT-129 105201~|~1~|~2~|~02/S5K~|~Plan split for the small urban locations on BUT-732 116390~|~1~|~1~|~01/NHS~|~JEF-22 114810~|~1~|~1~|~01/IMS~|~FRA-70 from SLM 11.21 to 13.13. 114810~|~1~|~2~|~02/S<2~|~PIC-752 from SLM 1.64-1.92. 114810~|~1~|~3~|~03/STR~|~MAR-309 form SLM 22.77 to 29.21 and PIC 56 from SLM 0.00 to 16.32. 121233~|~1~|~1~|~01/STR~|~Structure replacement. 101401~|~1~|~1~|~01/STR~|~STP Rural Overlay without Repairs 101401~|~2~|~2~|~02/STR~|~Bridge Work 118507~|~1~|~1~|~01/MPO~|~Federal items 118507~|~1~|~2~|~02/SAF~|~Safety Items 111088~|~1~|~1~|~01/SAE/NEWA~|~Safety Program Funded - 4HJ7 (100% Federal) - See CAP Comments - Construction of roundabout at the intersection of SR 13 (4th Street) and CR 132 (Main Street). 90662~|~1~|~1~|~01/MPO~|~Multi-Use trails 123871~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing. 114512~|~1~|~1~|~01/IMS~|~Resurfacing 96899~|~1~|~1~|~01/STR~|~It is proposed to rebulid and stabilize our existing slope to stop vertical and horizontal slide movement on SR 125 0.34 miles east of County Line. 97908~|~1~|~1~|~01/ENH~|~Jefferson St. from Third to Fourth St. - Third St. from Jefferson St. to St. Clair St. - St. Clair St. from Third to Fourth St. - Fourth St. from Jefferson. - This project will improve the sidewalks and crosswalks, and include the installation of pedestrian amenities (such as benches, banners, decorative lightin, etc.) 110631~|~1~|~1~|~01/SAF~|~Construction of sidewalks in East Palestine with 100% 4SC7 federal funds. 119107~|~1~|~1~|~01/NHS~|~Resurfacing. 119107~|~1~|~2~|~02/S>2~|~Resurfacing. 119107~|~1~|~3~|~03/STR~|~Resurfacing. 99946~|~1~|~1~|~01/STR~|~Culvert Replacement 112774~|~1~|~1~|~01/S<2~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 118849~|~1~|~1~|~01/STR~|~added plan split. 118849~|~1~|~2~|~02/NHS~|~NHS plan split. 94979~|~1~|~1~|~01/S<2~|~Marion large city/local funding for resurfacing of various city streets 114804~|~1~|~1~|~01/IMS~|~Interstate plan split. 114804~|~1~|~2~|~02/NHS~|~NHS plan split. 114804~|~1~|~3~|~03/S>2~|~Columbus urban area plans split. 87528~|~1~|~2~|~02/ENH~|~Items related to a new side walk including a series of catch basins, curb and gutter along US 50, within the Village of Marathon, Clermont County. 87528~|~1~|~1~|~01/STR~|~Construct new pavement along US 50 within the Village of Marathon due to profile change and resurface SR 286 in Clermont County. Locations are US 50: 18.08 to 18.43 and SR 286: 0.00 to 0.30 87528~|~1~|~3~|~03/STR~|~Plan Split for all work on SR 286 since it is not eligilble for Federal funds. 95930~|~1~|~3~|~03/NHS~|~80/20 fed/state split for work on SR-44 95930~|~1~|~1~|~01/SAF~|~Microsurface IR-77 Exit/Entrance ramps using safety funding with 90% federal and 10% state participation. 95930~|~1~|~2~|~02/IMS~|~90/10 fed/state funding split for work on the interstates other than safety. 94347~|~1~|~1~|~01/NFP~|~01/NFP/BR/ ; All work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7. 117063~|~1~|~2~|~02/MPO/SUCE~|~Resurfacing, Summit County Engineer. 117063~|~1~|~1~|~01/MPO/FAIR~|~Resurfacing, in the City of Fairlawn. 121086~|~1~|~1~|~01/NFP~|~added RPM FY29 90918~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 90918~|~1~|~2~|~02/NHS~|~Village of Greenwich Water line Relocation. 90918~|~1~|~3~|~03/NHS~|~Columbia Gas work 115103~|~1~|~1~|~01/STR~|~Rock slope repair. 105066~|~1~|~1~|~01/STR~|~Single microsurfacing on ATB US 6 from 2.63 to 5.75, 20.61 to 22.56, 25.18 to 29.95; ATB US 322 from 0.00 to 17.49. 99021~|~1~|~1~|~01/SAF~|~District wide polyester pavement marking 98024~|~1~|~3~|~03/NHS~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. NHS route funded 80 federal/20 state. 98024~|~1~|~2~|~02/STR~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Rural other federal aid route funded 80 federal/20 state. 98024~|~1~|~4~|~04/S<2~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Urban other federal aid route funded 80 federal/20 state. 98024~|~1~|~5~|~05/NFA~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Not on the federal aid system funded 100% state. 98024~|~1~|~1~|~01/IMS~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Interstate route. Funded 80 federal/20 state. 114748~|~1~|~1~|~01/STR~|~Culvert plan split 103373~|~1~|~1~|~01/SAF~|~Plan Split 1 117551~|~1~|~1~|~01/NFA/BOAR~|~New sidewalks. 95992~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - Plan Split for Mus-60-(9.13-13.02) 95992~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - Plan Split for Mus-60-(13.02-15.02) 100032~|~1~|~1~|~01/ENH~|~Construction of sidewalk on the south side of Bridgetown Road (SR-264) from the Township's Public Library to Markay Court. 108683~|~1~|~1~|~01/SAF~|~Safety Plan Split 97242~|~1~|~1~|~01/NHS~|~Remove deteriorated non-composite box beams and replace with composite box beam superstructure. (BR. No. MOT-235-0177R, SFN 5709792) 110874~|~1~|~1~|~01/S<2~|~Landslide repair. 99928~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project with an asphalt overlay treatment. WAS CR 341 0.00-1.01. Rural other federal aid funded 80 federal/20 local. 90399~|~1~|~1~|~01/IMS~|~Sign (all overhead guide, ground mounted guide, regulatory, and warning signs) replacement project on IR 77 in Tuscarawas county from SLM 20.54 to 34.97. 90399~|~1~|~2~|~02/S<2~|~Sign (all overhead guide, ground mounted guide, regulatory, and warning signs) on COL 62 from SLM 13.01 to 14.12 and on COL 14T from SLM 0.00 to 1.53. 119219~|~1~|~1~|~01/IMS~|~Interstate plan split 119219~|~1~|~2~|~02/STR~|~Rural plan split. 108459~|~1~|~2~|~02/STR~|~Split for work on the rural STP system 108459~|~1~|~3~|~03/NHS~|~Plan split for work on the NHS 108459~|~1~|~1~|~01/S>2~|~Split for work on the Cleveland urban STP system. 108459~|~1~|~4~|~04/S<2~|~Split for work on the Chardon urban STP system. 108459~|~1~|~5~|~05/NFA~|~Setup part code from utility reimbursement from First Energy 102625~|~1~|~1~|~01/MPO~|~Add sidewalks 94135~|~1~|~1~|~01/STR~|~Resurfacing MAH SR 617 from 0.00 to 3.68 and 3.77 to 4.74, includes minor work to SFN 5006074. 102498~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Replacement of RPM District Wide in FY 2022. 122129~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement. 120684~|~1~|~1~|~01/NHS~|~Tree Cutting on ATH 33 18.70-25.39 and MEG 33 0.00-4.09. Funded 100% State. 88233~|~1~|~1~|~01/NFA~|~Rural route not on federal aid system. GSMP funds up to $1,000,000 then district funds after that. Landslide into creek, realigning roadway to mitigate landslide. 112980~|~1~|~1~|~01/IMS~|~Paint and patch substructure of 1401416 & 1401505. Paint, patch barrier and substructure, and replace VPF of 1402102. 112980~|~1~|~2~|~02/S>2~|~Plan Split for the Large Urban Locations. 112980~|~1~|~3~|~03/S5K~|~Plan Split for the Small Urban locations. 112980~|~1~|~4~|~04/NFA~|~Plan Split for the Non Federal Aid route location. 119272~|~1~|~1~|~01/NHS~|~Roadway work to raise settled pavement to fix vehicle bounce leading into curve. 97134~|~1~|~1~|~01/NHS~|~upgrade queue detection with new signs and software 107345~|~1~|~1~|~01/NFA~|~D09 Deck Sealing Project FY2024 111489~|~1~|~1~|~01/NFA~|~Plan split for bridge replacement work 91566~|~1~|~1~|~01/NHS~|~Replace existing deck on bridge (JEF-7-0771, SFN 4100301) with a new reinforced concrete deck made composite with existing or new beams. If existing beams are retained they will be painted. Provide new approach slabs. Repair/Rehabilitate substructure units and convert abutments to semi-integral. 122964~|~1~|~1~|~01/IMS~|~Plan split for bridge work. 113490~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 108024~|~1~|~1~|~01/NFP~|~Mowing 93031~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - Geological Site Management 4SS7(100% State) - CAP = $230,000.00 - Embankment stabilization below KNO SR229 14.8-14.80 114605~|~1~|~1~|~01/MPO~|~This split includes all work associated with constructing the sidewalk proposed with this project 114605~|~1~|~2~|~02/SAF~|~Work includes all curb ramps, traffic control, traffic signal and maintenance of traffic related to pedestrian improvements at the intersection. 110914~|~1~|~1~|~01/NHS~|~Collision impact repair of the BUT-129-2139 bridge that carries Van Goren Rd over SR 129. 115607~|~1~|~1~|~01/IMS~|~Mowing Contract 93194~|~1~|~1~|~01/STR~|~General system paving of MAR-309: 29.30-30.09, MRW-309: 2.48-4.92, and MRW-61: 22.86-25.27 119282~|~1~|~1~|~01/NFA~|~Created for J&C involvement 105154~|~1~|~1~|~01/BRO~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 117379~|~1~|~1~|~01/MPO/LOWE~|~Resurfacing of River Rd, E McGaffney Ave and E Jackson Rd in the Village of Lowellville. 99085~|~1~|~1~|~01/NHS~|~Slope failure 96542~|~1~|~2~|~02/IMS~|~Structural Steel repair on SFN 1204025 CLA-70-0657, SFN 5707021 MOT-75-0958 and SFN 5706998 MOT-75-0932. 96542~|~1~|~4~|~04/S>2~|~Structural Steel repaid on SFN 1205528 CLA-72-0915. 96542~|~1~|~7~|~07/NHS~|~SFN 4601564 LOG US 68-0979 - repair rt. rear fascia abutment bearing concrete area. Reset loose bearings 1 forward abutment and 1 rear abutment. Replace perforated end frame forward abutment. 96542~|~1~|~5~|~05/NHS~|~Structural Steel Repair on SFN 1902431 DAR-36-1300R 96542~|~1~|~3~|~03/NHS~|~Structural Steel Repair on SFN 1202707, CLA-68-0741. 96542~|~1~|~1~|~01/NHS~|~Structural steel repair on SFN 0600253 AUG-33-0591L and SFN 1200038 CLA-4-0667L. SFN 4600916 LOG-33-0280 R (NP 000) - reset all bearings, look at a pin retrofit for one masonary plate. 96542~|~1~|~6~|~06/NHS~|~SFN 4603737 - LOG SR 540 0165 (NF 706) - 4 bearings on forward abutment out of sdjustment (2 beyond recall) and need reset. 2 bearings on rear abutment and need reset. 87240~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using a mill and fill treatment. ATH US 33 5.92-10.40. NHS route paid 80 federal/20 state. 111281~|~1~|~1~|~01/NFP~|~Excavate, prepare and asphalt new parking lot at the Holzapfel Preserve. 117932~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance. 90755~|~1~|~1~|~01/BRF~|~Project includes replacement of Bridge BUT-TR 58-0039 SFN 0931306 over Four Mile Creek, and improving horizontal and vertical alignments associated with the bridge. Existing pavement in the project area will be widened to provide a safer roadway system. Pedestrian access will be provided across the bridge to Yager Stadium and other facilities from the parking areas on the east side of the bridge. 89399~|~1~|~1~|~01/STR~|~BRO SR 505 0.18 Slide Repair 80/20 split. 89267~|~1~|~1~|~01/S>2~|~Split for Urban System paving work on the STP 89267~|~1~|~3~|~03/NHS~|~Split for paving work on the NHS 89267~|~1~|~5~|~05/S>2~|~Split for General System paving work in Brooklyn Heights 89267~|~1~|~2~|~02/NFP~|~Split for 100% local items of work on the STP Urban System 89267~|~1~|~4~|~04/NFP~|~Split for 100% local items of work on the NHS Urban System. 89267~|~1~|~6~|~06/NFP~|~Split for 100% local items on the General System 94420~|~1~|~1~|~01/STR~|~Two Lane Resurfacing 94420~|~1~|~2~|~02/STR~|~LOR-57-4.45 SFN: 4702395Preventative Maintenance- Bridge railing upgrade/repair ? Provide guardrail retrofit upgradeReactive Maintenance- Deck overlay (asphalt) - Plane and pave full width 85361~|~1~|~2~|~02/S>2~|~100% Local participation for non-eligible work items, CE&I and cost over the state funding cap. 85361~|~1~|~1~|~01/S>2~|~80/20 state/local funding split for the resurfacing portion of the project using state urban paving funds. 97348~|~1~|~1~|~01/NHS~|~Added 108050~|~1~|~1~|~01/CMQ~|~Construction of bike/ped path in Barnesville. 87595~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation Funding - No CAP - Gue-IR 70-22.80 to the 28.50. Includes the overlay of SFN 3002160 and SFN 3002195 and resurfacing of the ramps at SR 513. 98179~|~1~|~1~|~01/STR~|~STP Rural Non-BR Bridge Replacement PIC-62-4.51 116063~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV/ - 90% 4PF7/10% 4PS7 107387~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2021. Locations include: WAS 50 4.42-5.88, MEG 32 0.00-3.82, VIN 32 0.00-7.67, WAS 7 4.42-20.41 and WAS 339 0.11-0.41. 107387~|~1~|~3~|~03/SAF~|~Install supports and signs for the Distracted Driving Corridor and ATH 33. 107387~|~1~|~2~|~02/S<2~|~Extrusheet sign replacement in D10 for FY 2021. Urban route locations include: WAS 339 0.41-0.46 and WAS 618 0.00-1.19. 124070~|~1~|~1~|~01/MPO/STPK~|~Resurfacing trail. 101518~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 7 5.22-10.20. NHS route funded 80 federal20 state. 101518~|~1~|~2~|~02/SAF~|~Add safety rumble stripes to GAL 7 5.22-10.20. 90% Federal Safety and 10% State Safety funds. 115010~|~1~|~1~|~01/S>2~|~Construction of a roundabout 118878~|~1~|~1~|~01/NHS~|~plan split. 96180~|~1~|~1~|~01/NHS/Nerk~|~"01/NHS/PV/NERK" - Plan Split for resurfacing Lic-13-(10.19-11.89) 107707~|~1~|~1~|~01/IMS~|~Capacity improvements at NW Interchange. 93181~|~1~|~1~|~01/NFP~|~Herbicidal Spraying on SUM IR 76 0.00 to 15.42 and TRU IR 80 0.00 to 12.33 and TRU SR 11 3.45 to 28.47. 105245~|~1~|~1~|~01/STR~|~Resurfacing HOL-241 from SLM 7.75 to the Wayne Co. Line 98404~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on:CLE-125 SLM 5.13 to 6.92CLE-125 SLM 6.92 to 7.11CLE-125 SLM 7.11 to 7.37CLE-125 SLM 7.37 to 8.95 94076~|~1~|~1~|~01/NFA~|~Construct a new 40' X 80' equipment storage building at the Logan County Garage Complex. 102145~|~1~|~1~|~01/S<2~|~Bridge Replacement SCI SR 140 1.64 (SFN 7304021) 106686~|~1~|~1~|~01/ENH~|~Construct 10' - 12' bike/ped path in the Dover Canal Park, ADA compliant with lighting. 105539~|~1~|~1~|~01/S>2~|~Routes located within the Columbus Urban Area and their associated bridges 105539~|~1~|~2~|~02/STR~|~Routes located in the Rural Area and their associated bridges 105539~|~1~|~3~|~03/IMS~|~Routes on the interstate system and associated bridges 105539~|~1~|~4~|~04/NHS~|~Routes on the NHS and associated bridges 115788~|~1~|~1~|~01/S5K/USAN~|~All work in the project. 95% federal funds from the Small City program until the cap is reached. The match and all funds needed after the cap is reached will be provided by the City of Upper Sandusky. 115851~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2029. Various routes and sections in D10. 99605~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 108034~|~1~|~1~|~01/S<2~|~Bridge. 95921~|~1~|~1~|~01/NFP~|~Design and Construction ( as per Facilities Master Plan) of New Crawford County Garage 124966~|~1~|~1~|~01/MPO~|~mill and pave Glendale Milford Road from Springfield Pike to Wayne Avenue in the Village of Woodlawn 93104~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/BR/ZANE" - City of Zanesville STP Funding 4TA7Z05 (80% Federal) / LNTP (20% Local) - No CAP - Replacement of deficient bridge on CR 146 over Joes Run - Not BR Eligible for Rehabilitation or Replacement 107145~|~1~|~1~|~01/NFA~|~The City will extend Vision Dr. approx. 1200' north of Production Dr and improve Bonnewitz Ave starting at John Browns Rd 7500' east to SR 127 83378~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment and retaining wall. Remove failed wall flatten out slopes with new embankment. 109654~|~1~|~1~|~01/S>2~|~Resurfacing on the urban section of BUT-177 109654~|~1~|~2~|~02/STR~|~Resurfacing the rural portion of BUT-177 104651~|~1~|~1~|~01/ENH~|~Construct new McGaffney Road Extension in the City of Lowellville. 117801~|~1~|~1~|~01/STR~|~Two Lane Resurfacing Project using a microsurfacing treatment. WAS SR 339 13.54-20.22, NOB 78 16.04-21.29. 100777~|~1~|~1~|~01/NHS~|~Bridge painting project. VIN 32 2.58 L (SFN 8202737) & R (SFN 8202761), 6.39 L (SFN 8202850) & R (SFN 8202885), 7.48 L (SFN 8202915) & R (SFN 8202974). NHS route funded 80 federal/20 state. 100777~|~1~|~2~|~02/STR~|~Bridge painting project. MEG 124 5589 (SFN 5301831). Rural other federal aid funded 80 federal/20 state. 120665~|~1~|~1~|~01/STR~|~Resurfacing. 115339~|~1~|~1~|~01/MPO/AURO~|~Resurfacing. 122135~|~1~|~1~|~01/S>2/FCEO~|~CEAO safety funded replacement of the bridge carrying CR 125 (Frank Rd) over a tributary to Scioto Big Run. 83299~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" - County Engineer's Association Funding 4B87(80% Federal) / LNTP(20% Local) (Credit Bridge Approval 1/13/2011 for 15% match) - CAP = $707,000.00 CEAO Federal dollars/$106,050.00 in Credit Bridge Revenue - Replacement of 2339331 FAI CR24 0.33 Intersect: T Muddy Prairie Run(Cr24; BR Eligible for Replacement: Length=36 SD/FO(1) SR=49.8 DSR=6 85375~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-SR 37-15.73 to 16.21; 2) Lic-SR 16-14.26 to 19.79; 85375~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-SR 37-16.43 to 16.66; 2) Lic-SR 661-00.00 to 00.02; 85375~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Lic-SR 661-00.02 to 00.12 103073~|~1~|~1~|~01/STR~|~Plan Split 01 created for Crackseal Block FY22 103073~|~1~|~2~|~02/STR~|~Plan Split 01 created for Construction Engineering Crackseal Block FY22 96650~|~1~|~1~|~01/NHS~|~01/NHS/PV ; All work is in this split. Funding is 80% federal and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7. 85078~|~1~|~1~|~01/MPO~|~Plan Split for SUM SR 91 21.11 to 21.65 92753~|~1~|~1~|~01/MPO~|~LAW Intermodal Crand Foundation South Point Ohio Project Description: The proposed project is the construction of a sheet pile dock along the Ohio River to support a crane at the River Port Facility at The Point Industrial Park in South Point, Ohio. The crane will allow the transfer of bulk freight products from truck to water and vice versa. It is anticipated that an independent operator will provide a crane capable of transferring products between road and river thus providing a resource to move products in the most efficient way from the TriState Region to other areas throughout the Midwest. The crane will be provided by the operator and it must meet the Corps of Engineers specifications. Currently there are no similar private or public crane facilities within 100 miles of the site. The project encompasses all phases of work at the riverfront site. The Point is located adjacent to the Ohio River and is part of the Port of Huntington. It is also located near I-64, US 52, and the Heartland Corridor. For full project description/details refer to PID# 85830. An MOU is written to attach to an LPA agreement between the Port Authority & LEDC, Lawrence County Engineer (TID) & MPO KYOVA with SIB loan. Coordination between FHWA & MARAD for US DOT oversight. 80% Fed KYOVA & 20% Local Match (Ironton) 01/MPO/OT/Ironton 111254~|~1~|~2~|~02/S<2~|~Resurfacing CR38 3.85-4.01 111254~|~1~|~1~|~01/STR~|~Resurfacing CR9, CR22, CR23, CR38, CR40, CR153 111254~|~1~|~3~|~03/NFA~|~Resurfacing CR19, CR25, CR28, CR166 105432~|~1~|~1~|~01/IMS~|~Fundling split for interstate bridges 105432~|~1~|~2~|~02/NHS~|~Funding split for NHS bridge 97932~|~1~|~1~|~01/ERD~|~Roadway rehabilitation of Lincoln Avenue, including enhanced crosswalks and signage, along with the installation of pedestrian signals, in the City of Youngstown, Mahoning County, Ohio. 113939~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 821 4.44-11.74. 113939~|~1~|~2~|~02/SAF~|~Shoulder widening on WAS 821 4.44 funded 90% Federal Safety/10% State Safety. 105736~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items 105736~|~1~|~2~|~02/MPO~|~Plan Split 2 for 100% local items 88922~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (BEL-148-1070, SFN 0704024) with a new single span slab bridge or a four-sdied precast concrete box structure. 84624~|~1~|~1~|~01/STR~|~It is proposed, on SR772, beginning at the Pike Co. line (0.00) and ending at Blaine Hwy (CR167) (6.36),to resurface the existing highway with asphalt concrete on portions of the highway.80 Fed/20 State 01/STR/PV/State 121100~|~1~|~1~|~01/IMS~|~Construction 124709~|~1~|~1~|~01/S>2~|~Plan Split for roadway reconfiguration and pavement markings for a separated bike lane using safety funding. 101846~|~1~|~1~|~01/NFA~|~Split for instream and slope repair 98061~|~1~|~1~|~01/IMS~|~Widening and concrete overlay of SFN#7702671, SUM-IR77-9.58L, in Coventry Township, Summit County, Ohio. 98061~|~1~|~2~|~02/IMS~|~Deck replacement of SFN# 7705794, Pedestrian bridge at Chester, in the City of Akron, Summit County, Ohio. 112812~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 45 from 2.84 to 10.63. 112812~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span. 123548~|~1~|~1~|~01/NFP~|~D09 DS FY2031 121504~|~1~|~1~|~01/SAF~|~Traffic signal & lighting maintenance 103297~|~1~|~1~|~01/IMS~|~Split for interstate grass mowing 122066~|~1~|~1~|~01/NFP~|~Plan Split for repairing guardrail in all counties in District Six, besides Franklin County. 98793~|~1~|~1~|~01/SAF~|~Conversion of the existing signal controlled intersection of Beckett Road and Smith Road with a single lane modern roundabout. 92884~|~1~|~4~|~04/NHS~|~80/20 Fed/City NHS section 92884~|~1~|~3~|~03/S<2~|~80/20 Fed/City STP section 92884~|~1~|~1~|~01/S<2~|~District Allocation 92884~|~1~|~2~|~02/NHS/HUR~|~100% City of Huron 92884~|~1~|~5~|~05/NHS~|~NHS Bridge Work 115196~|~1~|~1~|~01/ENH~|~Construction of a bikeway along the top of the levee. 88896~|~1~|~2~|~02/S>2~|~Resurfacing SR 619 4.66 to 5.10. 88896~|~1~|~4~|~04/NHS~|~not BR Eligible: SFN 7601808 SR44 14.36 over US62 30.18 88896~|~1~|~3~|~03/STR~|~Resurfacing SR 44 from 19.39 to 23.21. 88896~|~1~|~1~|~01/NHS~|~Resurfacing SR 44 13.69 to 14.67. 88896~|~1~|~5~|~05/SAF~|~Replace sign truss and mount larger warning signs on US 62 near Rowland. 107732~|~1~|~1~|~01/STR~|~Land slide repair project. MOE 536 7.01-7.11. 100% Federal ER funds. 107732~|~1~|~2~|~02/STR~|~MOT items and work related to Stat Oil moving an oversize load through the work site during construction phase. 100% Private Pay. 102487~|~1~|~1~|~01/NHS~|~SR 7 17.74 to 20.08 Double microsurfacing 111252~|~1~|~1~|~01/SAF~|~Realign the skewed intersection of Kirby Ave and Bruce Ave. 86157~|~1~|~1~|~01/STR~|~Structure replacement WAS 26 19.16, SFN 8401055. Funding 80/20% Federal/State. 113723~|~1~|~1~|~01/SAF~|~Various intersection and minor access management improvements on Harrison Avenue from New Haven to West Road. 113831~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 84387~|~1~|~1~|~01/STR~|~STP Rural chip seal project 93656~|~1~|~2~|~02/S<2~|~State and federal funds from the District Preservation Program budget. For work inside the Van Wert Urban Area but outside the City of Van Wert. No local funds. On left side of US 224 from the Van Wert Urban Boundary at 9.26 at Liberty Union Road to the end of the project at US 30 and on the right side of the road from the corportation limits of the City of Van Wert at 9.34 to the end of the project at US 30. 93656~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. Rural STP. On US 224 from the beginning of the project at 0.00 to the Van Wert Urban Area Boundary at 9.26 at Liberty Union Road. For work outside the Van Wert Urban Area. No local funds. 93656~|~1~|~3~|~03/S<2/VAN~|~Federal funds from the District Preservation Program budget with the 20% match provided by the City of Van Wert. Resurfacing work on US 224 on the right side of the road from the Van Wert Urban Area Boundary at 9.26 to the corportation limits of the City of Van Wert at 9.34. Work is both inside the Van Wert Urban Area and the City of Van Wert. 93937~|~1~|~1~|~01/NFP~|~100% State Funds (4MP7) for district wide auxiliary pavement marking. 96838~|~1~|~1~|~01/BRO~|~Type B Emergency Bridge Expansion Joint Repairs 104107~|~1~|~1~|~01/NFP~|~Plan split 108041~|~1~|~1~|~01/IMS~|~Crack seal minor repairs: MOT IR 70 SLM 6.71 to 10.79 119886~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-E 114283~|~1~|~2~|~02/IMS~|~Plan Split for mowing in MOT Co 114283~|~1~|~1~|~01/IMS~|~Mowing contract for routes in D8 94588~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt inlay treatment. WAS 7 39.00-49.43. NHS route funded 100% state. 92823~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on NHS route 111650~|~1~|~4~|~04/STR~|~AC Overlay w/Rpr RIC-42-0.00 to 2.79 Rural Section 111650~|~1~|~5~|~05/NHS~|~Bridge Work - CRA US 30 21.188 SFN 1701886Preventive Maintenance: Deck patching (concrete) (049) 111650~|~1~|~6~|~06/S5K~|~Bridge Work CRA SR 61 3.608 SFN 1701924: Preventive Maintenance Expansion joint repair/replacement (048) Reactive Maintenance Deck patching(conc) (049) CRA SR 61 4.586 SFN 1701959: Preventive Maintenance Expansion joint repair/replacement (048) Bridge railing upgrade/repair (061)CRA SR 61 6.850: Preventive Maintenance Drainage system cleaned/repaired (028) Expansion joint repair/replacement (048) Bridge railing upgrade/repair (061) 111650~|~1~|~7~|~07/SAF~|~Centerline rumble stripes on RIC-42-0.00-2.799 111650~|~1~|~1~|~01/S5K~|~Federal/State: Urbanized Area STP 5,000 - 49,999 Outside Corp. Limit (Paving Items): 111650~|~1~|~2~|~02/S5K~|~Federal/Local Urbanized Area STP 5,000 - 49,999 Inside Galion Corp. Limit (Paving Items),Priority 1 100% 4BG7 is for alternate bid pavement marking items if the city agrees to them 111650~|~1~|~3~|~03/S5K~|~100% Local: Urbanized Area STP 5,000 - 49,000 Inside Galion Corp. Limit (100% City Items Such as Pavement Repairs, Curb Ramps, Curb Repair etc.): 111650~|~1~|~8~|~08/S50~|~Paving Urbanized Area STP 50,000 - 200,000. 114891~|~1~|~1~|~01/S>2~|~Columbus urban area plan split. 103774~|~1~|~1~|~01/NHS~|~Emergency culvert & pavement repair 109738~|~1~|~1~|~01/NHS~|~Resurfacing 113238~|~1~|~1~|~01/NFA~|~Rehabilitate and resurface various roads and parking lots within Winton Woods Park. The work shall consist of pavement planing, pavement repairs, asphalt concrete surface course, parking blocks, and pavement markings. 109846~|~1~|~1~|~01/NHS~|~SCI 23 2.67-10.57 98224~|~1~|~1~|~01/NFP~|~ District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Replacement of RPM's on various routes in District 5 as part of three year cycle. 83987~|~2~|~2~|~02/S<2/HIG~|~Hobart/Carl Smith Drive Urban CollectorPart 2 w/City providing local matchFrom Homestead Road (SLM 0.69) to US62 (SLM 1.20). 83987~|~1~|~1~|~01/S<2/HIG~|~HIG Hobart/Carl Smith Drive Rural Major Collector SLM 0.00 - SLM 0.69Part 1 w/County (Co) providing local match.From SR73 to Homestead Road. 83987~|~3~|~3~|~03/S<2~|~Part 3 will include intersection improvements at CR 1159 0.75-0.85(SR73/Harry Sauner Road) & CR 10 0.00-0.04 (Harry Sauner Road/ Carrytown Road) as well as upgrades to Careytown road north to the new construction of the roundabout. 93213~|~1~|~1~|~01/STR~|~General system paving of DEL-37: 21.94-29.08 105437~|~1~|~1~|~01/IMS~|~Deck repairs and patching on structure FRA-71-1526L 111367~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer FY2024 project to install new and upgrade existing guardrail on various county roads. 4HB7 - See cap comments. 119864~|~1~|~1~|~01/S5K~|~All Work Included in this Split 91624~|~1~|~1~|~01/IMS~|~Spot pavement repair on FAY-71, FRA-70, FRA-71, FRA-270, FRA-670, MAD-71, PIC-71 93101~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span. 93101~|~1~|~1~|~01/IMS~|~Resurfacing. 93101~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 10' to 20' span and culvert work. 93101~|~1~|~4~|~04/NHS~|~MSE wall repairs relating to the linked structure. 92262~|~1~|~1~|~01/STR~|~Culvert Construction/Repair 112179~|~1~|~1~|~01/SAF~|~Various Safety measures in the City of Sidney. 101173~|~1~|~1~|~01/STR~|~Microsurfacing on rural routes: DAR SR 49 SLM 32.02 to 35.96 & DAR SR 121 SLM 28.87 to 29.54 121982~|~1~|~1~|~01/NHS~|~Repair damage to Gender Rd bridge over US 33 from a vehicle hit 100620~|~1~|~1~|~01/STR~|~Plan split for rural portion of CLE SR276 SLM 1.21 to 5.28 100620~|~1~|~2~|~02/S>2~|~Plan split for urban portion of CLE SR276 SLM 0.51 to 1.21 and 5.28 to 6.10 100620~|~1~|~3~|~03/STR~|~Replace culvert CLE-276-0453 - Install new culvert - CFN 1976427. 117362~|~1~|~1~|~01/BRF/Ash~|~Beams Only thru CEAO 105179~|~1~|~1~|~01/S<2~|~Micro surfacing from SR 7 to SLM 4.20 105179~|~1~|~2~|~02/STR~|~Micro surfacing from SLM 4.20 (CR 3) to CR 4 111482~|~2~|~2~|~02/S>2~|~Replacement of type A anchor assemblies: Large Urban Areas 111482~|~3~|~3~|~03/STR~|~Replacement of type A anchor assemblies: Rural Areas 111482~|~1~|~1~|~01/NHS~|~Replacement of type A anchor assemblies: NHS Routes 93625~|~1~|~2~|~02/STR~|~For work on sections of road classified as a Rural Major Collector. Funding is state and federal funds from the District Preservation Program budget. All work on SR 66. Work on SR 117 from the west corportation limits of Spencerville Road to the Lima Urbanized Area Boundary at SR 501 which is at 10.78. Work on SR 501 in Allen County from the Auglaize County line to the Lima Urbanized Area Boundary at Breese Road which is at 2.01. 93625~|~1~|~1~|~01/S<2~|~For work inside the Lima Urbanized Area but outside the City of Lima. Funding is state and federal funds from the District Preservation Program. No local funds. Work on SR 117 from the Lima Urbanized Boundary at SR 501 (10.78) to the end of the work on SR 117 at Seriff Road. Work on SR 501 from the Lima Urbanized Boundary at Breese Road (2.01) to the end of SR 501 at SR 117. 118813~|~1~|~1~|~01/S5K~|~Slope/erosion repair along ATB SR 531 by construction of 3 sheet pile walls. 120846~|~1~|~1~|~01/IMS~|~Repair of median concrete walls. 107911~|~1~|~1~|~01/STR~|~Rural Plan Split 107911~|~1~|~2~|~02/NHS~|~NHS Plan Split 107911~|~1~|~3~|~03/S<2~|~Urban Area (STP<200000) Plan Split 107911~|~1~|~4~|~04/S>2~|~Urban Area (STP>200,000) Plan Split 107911~|~1~|~5~|~05/NFA~|~Not on the fed aid system plan split 118969~|~1~|~1~|~01/SAF~|~Plan split for reflective/wet reflective pavement markers. 89444~|~1~|~1~|~01/IMS~|~Pruning, Tree/Bush Removal 116872~|~1~|~1~|~01/S>2~|~Resurfacing 88685~|~1~|~1~|~01/STR~|~Pavement marking throughout the District. Funding classification splits not necessary with 4CP7 funding. 123610~|~1~|~1~|~01/S5K~|~Plan split for STP 5,000-49,999 109901~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 78 13.00. DSR MRG-002. Funded 80 federal/20 state ER. 100251~|~1~|~1~|~01/MPO~|~Rehabilitate Cedar Road using MPO STP funds. 100251~|~1~|~2~|~02/NFP~|~100% local participation for work not eligible for federal-aid 93244~|~1~|~1~|~01/MPO~|~Widen and reconstruct to three lanes including 8' paved shoulders and improve the alignment to eliminate horizontal and vertical deficiencies. Bridge# MOT CR 166 03.55 will be replaced due to roadway alignment changes. Located Miamisburg-Springboro Pike from Benner Road to Medlar Road. 124899~|~1~|~1~|~01/ENH~|~MPO TAP funds 95288~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE CR 32 0.32, SFN 5630851. CEAO funded project. Funded 80 federal/20 local. 13034~|~1~|~1~|~01/CMQ~|~CMAQ funding for Columbus Traffic Signal SystemExtend system to 320 intersections, replace central computer & software, signal controllers and communications equipment; install fiber optic cable, wireless communications, 20 traffic cameras 105603~|~1~|~1~|~01/SAF~|~Upgrade pavement markings on county roads. 91969~|~1~|~1~|~01/STR~|~ADA SR136 9.39 - 18.95 ResurfacingSR136, begin project at its intersection with SR125, north and terminate within the Village of Winchester. 0103284 (10.78) Pave Thru 0103349 (11.61) Pave Thru 0103470 (17.33) Pave Thru 0103489 (18.37) Pave Thru 80 Fed/20 State 91969~|~1~|~3~|~03/STR~|~Bridge Reconstruction on ADA 136 11.14 (SFN 0103306) 91969~|~1~|~2~|~02/STR~|~ADA SR136 Brdg rehab0103365 14.46 0103454 14.56 80/20 116712~|~1~|~1~|~01/IMS~|~Interstate Plan Split 110873~|~1~|~1~|~01/NHS~|~Mine subsidence repair. 112926~|~1~|~1~|~01/NHS~|~NHS Plan Split: FAY-35-0.00-2.58 112926~|~1~|~2~|~02/STR~|~Rural Plan Split: FAY-435-2.29-2.52 112926~|~1~|~3~|~03/S<2~|~Washington Court House Urban Area Plan Split: FAY-753-12.78-13.11 101434~|~1~|~2~|~02/S<2~|~Paving SR 31 from 2.09 to 2.77. Within Urban Area, but outside Marysville 101434~|~1~|~1~|~01/STR~|~Paving SR 31 from 2.77 to 7.80 and 15.65 to 20.38 and SR 347 from 4.22 to 8.26 103092~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 144 12.40. DSR ATH-002. 116650~|~1~|~1~|~01/NHS~|~CRA US 30 09.53 to 15.80. 116650~|~1~|~2~|~02/NHS~|~Bridge repair / maintenance to be completed with resurfacing project 104039~|~1~|~1~|~01/BRO~|~Emergency bridge repair work eligible for Local Major/High Cost Bridge funding. 104039~|~1~|~3~|~03/BRO~|~On-going services during construction. 104039~|~1~|~2~|~02/NFP~|~100% local participation for bridge repair work not eligible for federal-aid. 84506~|~1~|~2~|~02/BRO~|~Replace Roberts Rd bridge decks over I-270, qualifies for BR funds:2509636 FRA IR270 10.49 Intersect: Under Roberts Rd Eb Cr282509660 FRA IR270 10.5 Intersect: Under Roberts Rd Wb Cr2802/BR/BR/ 84506~|~1~|~1~|~01/SAF~|~Upgrade Roberts Rd interchange with safety funds up to safety cap for all phases, then use D6 funding for remaining funds01/SAF/OT/ 96747~|~1~|~2~|~02/S>2~|~Plan Split for 100% City items. These items include pavment repair, curbs, curb ramps, utility adjustments, and workzone striping. 96747~|~1~|~1~|~01/S>2~|~Plan split for items split 80% State and 20% Local. This will inlcude the planing, new asphalt, and final striping. Pavement repair and curb ramps are not included. 96747~|~1~|~3~|~03/NHS~|~Plan Split for the 80/20 split items on SR 4 between SLM 7.97-8.25 (maple to dayton) 96747~|~1~|~4~|~04/NHS~|~Plan split for the 100% City items on the SR 4 section between SLM 7.97-8.25 110549~|~1~|~1~|~01/STR~|~Rural plan split in the Village of LaRue - MAR 37 from 7.29 to 8.31 98466~|~1~|~1~|~01/STR~|~SmoothsealERI-6-0.00 to 3.64 98466~|~1~|~2~|~02/STR~|~Fine Graded Asphalt Concrete Surface Course and Safety Edge using Ontario Trap Rock ($30,0000 of safety funds approved for the Ontario Trap Rock) 105938~|~1~|~1~|~01/MPO~|~resurfacing work eligible for federal-aid 105938~|~1~|~2~|~02/NFP~|~Split for 100% local items 102971~|~1~|~1~|~01/NHS~|~AC Overlay without repairs on NHS route: MER SR 29 LSM 9.17 to 11.19. 102971~|~1~|~2~|~02/S<2~|~AC Overlay without repairs on Sm Urban route: MER SR 29 SLM 8.17 to 9.17. 124492~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement. 91392~|~1~|~1~|~01/STR~|~General system resurfacing on SR-47 from SR-31 to Richwood, then SR-37 from SR-47 to SR-47, then SR-47 from Richwood to DEL County line. DEL-42 from UNI CL to SR4. 114579~|~1~|~1~|~01/NHS~|~Rockfall repair project. WAS 7 39.12. Work includes rock bolts and shotcrete. 110286~|~1~|~1~|~01/NFP~|~Cracksealing along various routes 104884~|~1~|~1~|~01/NFP~|~D09 District Pavement Long Line Markings (B) 94263~|~1~|~1~|~01/S<2~|~FY2016 Urban Paving in the City of Trenton on SR 73. This Plan Split is the 80% ODOT and 20% City items on the Urban Portion of SR 73. From SLM 14.98 to 16.76. 94263~|~1~|~2~|~02/S<2~|~FY2016 Urban Paving in the City of Trenton on SR 73. This Plan Split is the 100% City items on the Urban Portion of SR 73. From SLM 14.98 to 16.76. 124940~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funding. 121718~|~1~|~1~|~01/NHS~|~Asphalt Concrete overlay including bridge maintenance ERI-2-24.503 to 30.494 121718~|~1~|~2~|~02/BRO~|~Bridge work. 83438~|~1~|~1~|~01/NFP/CRAA~|~Alum Creek Drive Extension project - currently unfunded 107922~|~1~|~1~|~01/STR~|~Repair or replace rural culverts. 122457~|~1~|~1~|~01/S5K~|~All work included in this split. 95267~|~1~|~1~|~01/IMS~|~A maintenance contract to perform mowing on a 2 district basis; and, perform necessary related work. 120756~|~1~|~1~|~01/S50~|~Pavement rehabilitation utilizing 100% State Oil & Shale (4SH7) funds up to CAP. 94133~|~1~|~1~|~01/S>2/STRE~|~Resurfacing of POR 303 from 2.71 to 4.98, Urban Paving in the City of Streetsboro. 94133~|~1~|~2~|~02/S>2/STRE~|~100% items paid by the City. 120695~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 310/Duncan Plains Road 109473~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4. 118567~|~1~|~1~|~01/STR~|~added plan split. 106760~|~1~|~1~|~01/ENH/ZANE~|~City of Zanesville Transportation Alternatives (TA) Program - 4B37 (80% Federal) / TRC (15% LNTP) / LNTP ( 5% Local) - See CAP Comments - Upgrading lighting and sidewalks along the north side of South Street between 3rd Street and 6th Street. 119870~|~1~|~1~|~01/NFA~|~Bridge replacement project. GAL CR 40 2.35 (SFN 2741210). 111346~|~1~|~1~|~01/NFA~|~Split for resurfacing work in the park 92986~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Per-SR 669-00.00 to 06.34; 2) Per-SR 669-06.97 to 09.72: 92986~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Per-SR 669-09.72 to 10.15 104102~|~1~|~1~|~01/IMS~|~Plan split for bridge work 110308~|~1~|~1~|~01/STR~|~Guardrail project LAW 775 7.13-7.39 88734~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill 113539~|~1~|~2~|~02/NFP~|~District Preservation Funding - 4PS7 (100% State Funds) - No CAP - Funds to upgrade the the undamaged section of guardrail to match the upgraded portion 113539~|~1~|~1~|~01/NFP~|~District 5 State Structure Damage Repair Funds - 4SR7 (100% State) - See CAP Comments - Deck Edge repairs and replacement of damaged guardrail on the bridge and approach to SFN 6004997 88408~|~1~|~1~|~01/BRO~|~Bridge replacement project. MOE 800 11.04. SFN 5603188. BR eligible funded 80 federal/20 state. 107793~|~1~|~2~|~02/S>2~|~Minor work on SFN 2102978, DEL-257-3.08 107793~|~1~|~1~|~01/S>2~|~DEL-257 from 1.53 to 5.69 107793~|~1~|~3~|~03/STR~|~DEL-257-5.69 to 7.77 100854~|~1~|~1~|~01/STR~|~Overlay on JAC 140. 110389~|~1~|~3~|~03/NFA~|~Resurface with asphalt concrete 110389~|~1~|~1~|~01/NHS~|~AC overlay with repairs 110389~|~1~|~2~|~02/STR~|~AC overlay with repairs 81656~|~1~|~1~|~01/S>2/MACE~|~Widening of State Route 82 from SLM 4.65 to SLM 5.92, in the City of Macedonia, Summit County, Ohio. 81656~|~1~|~2~|~02/S>2/TWIN~|~Resurfacing of SR-82 from SLM 5.95 to SLM 6.19 in the City of Twinsburg, Summit County, Ohio. 109676~|~1~|~1~|~01/STR~|~Resurfacing SR 331 111505~|~1~|~1~|~01/NHS~|~Slide repair. 88699~|~1~|~1~|~01/STR~|~Overlay US 127 in Mercer County with concrete asphalt:MER US 127 SLM 0.00 to 8.83 110841~|~1~|~1~|~01/NHS~|~Culvert lining on US 30 in Paulding County at the state line. Federal and state funds from the District Preservation Program budget. 119871~|~1~|~1~|~01/NHS~|~Installation of drainage structures 115830~|~1~|~1~|~01/NFP~|~Split for building demo work 97011~|~1~|~1~|~01/NHS~|~From SLM 14.9 to 16.11 110018~|~1~|~1~|~01/IMS~|~Noise Wall Repair. 120615~|~1~|~1~|~01/SAF~|~Construct roundabout on CR2 (Hayes) at CR119 (Richardson) 102539~|~1~|~3~|~03/STR~|~Replace culvert on rural route. 102539~|~1~|~4~|~04/STR~|~Bridge maintenance 102539~|~1~|~5~|~05/S>2~|~Bridge maintenance 102539~|~1~|~1~|~01/S>2~|~plan split for pavt work in the large urban section: 102539~|~1~|~2~|~02/STR~|~plan split for the pavt work in the rural section 99728~|~1~|~1~|~01/MPO~|~New sidewalks along Moore Road from Arlington Road to Charleston Drive. 109248~|~1~|~1~|~01/NFA~|~Add Split 106197~|~1~|~1~|~01/NFP~|~Replacing the linked culverts. 119281~|~1~|~1~|~01/NHS~|~Replace FRA-710-3.69 structure over Bison Run 116432~|~1~|~1~|~01/MPO~|~Add sections of Shared Use Paths to Anthony Wayne Trail and Waterville-Monclova Rd. 113174~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 50 28.74, SFN 8200661. Funded 80 Federal/20 State. 120061~|~1~|~1~|~01/NFA/LCEO~|~Rehabilitation of CR 26 85553~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) SFN 6002498 MUS IR70 6.94 Intersect: TR 271 Chapple Hill Rd #; Not BR Eligible for Rehabilitation: Length=112 SD/FO(0) SR=86.4 DSR=7; 2) SFN 6002498 MUS IR70 6.94 Intersect: TR 271 Chapple Hill Rd #; Not BR Eligible for Rehabilitation: Length=112 SD/FO(0) SR=87.4 DSR=7; 99475~|~1~|~1~|~01/S<2~|~Guardrail upgrade/replacement project. WAS CR 4 1.76-3.62 and 4.57-4.64. Urban other federal aid funded 80 federal(WWW-MPO)/20 local. 99475~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement project. WAS CR 4 3.62-4.57 and 4.64-4.72. Rural other federal aid funded 80 federal(WWW-MPO)/20 local. 113719~|~1~|~1~|~01/SAE~|~Roundabout related items - 100% Fed Safety 119067~|~1~|~1~|~01/MPO~|~OKI TA funded portion of construction with a 20% local match. 107897~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-257-14.26-22.62 107232~|~1~|~1~|~01/NFP~|~Mowing work 80128~|~1~|~1~|~01/STR~|~Replace the bridge deck & clean and paint existing steel beams with system OZEU paint for HOL-62-1178 (SFN 3801233) with minimal approach roadway work. 97316~|~1~|~1~|~01/STR~|~ROS CR VAR GR 102685~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridge. 87225~|~1~|~1~|~01/NFA~|~0103608 ADA SR137 0.32 Intersect: Eastland Run 100% State. 01/NFA/BR/State 100002~|~1~|~2~|~02/NFA~|~Not on Fed Aid System Pavement: WAY-604- 4.17-18.59. 100002~|~3~|~3~|~03/NFA~|~Bridge Work. 100002~|~1~|~4~|~04/STR~|~Bridge Work on STP Rural Portions 100002~|~1~|~1~|~01/STR~|~STP Rural Pavement: WAY-604- 0.00-1.00, 1.13-3.80, 18.59-20.66 118070~|~1~|~1~|~01/SAF~|~Install Roundabout at SR 721/US 36 90695~|~1~|~1~|~01/MPO~|~LUC CR548 0.25-0.55 LUC Jackson Blvd Transit Center - MPO Enhancment monies are being used for the project 122344~|~1~|~1~|~01/MPO~|~Plan split for eligible work for the resurfacing and bike lane striping. 98637~|~1~|~1~|~01/STR~|~SFN 5400139, MER-29-0321 and SFN 5400732, MER-49-0490 on Wabash River - remove asphalt wearing surface and water-proofing from non-composite box beam structures. Repair T connections over piers. Install SDC hard overlay (non-composite). 110509~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Pier encasement on SFN 1602934 which is not BR Eligible: L= 263; SD/FO 90); DSR 7; SR 87.9 97861~|~1~|~1~|~01/STR~|~WOO-65-12.81 culvert 24106~|~1~|~1~|~01/BRO~|~80/20 fed/local funding split using federal local bridge program funding. 1830228 88724~|~1~|~1~|~01/BRO~|~4401913 LAW SR93 19.54 Intersect: Kimble CreekBrdg Replacement 80 Fed/20 State. 01/BRO/BR/State 111582~|~1~|~1~|~01/STR~|~CEAO Funded - Major Collector 111582~|~1~|~2~|~02/NFA~|~CEAO funded - Minor Collectors 121010~|~1~|~1~|~01/NFA~|~Plan Split to resurface campgrounds in Ceasar Creek State Park 101275~|~1~|~1~|~01/NHS~|~Resurfacing SR 2 in Lucas and Ottawa Counties. 115187~|~1~|~1~|~01/S>2~|~Landslide/slope repairs. 105171~|~1~|~2~|~02/STR~|~Superstructure replacement. 105171~|~1~|~1~|~01/STR~|~Minor bridge rehab. 95231~|~1~|~1~|~01/SAF~|~100% CEAO Safety funded guardrail replacement. 114951~|~1~|~1~|~01/BRF~|~CEAO LBR funds 115548~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in ATB, MAH and TRU counties. 102765~|~1~|~2~|~02/NHS~|~Plan Split 02 created for NHS routes 102765~|~1~|~3~|~03/S<2~|~Plan Split 03 created for STP < 200000 routes 102765~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes 105842~|~1~|~1~|~01/IMS~|~Added plan split 91536~|~1~|~1~|~01/SAF~|~Project includes the addition of left turn lanes at the intersections of Adams, Niagara, and Dolphin Streets (if warranted), upgrades to the existing signalized intersections with Compton Road, and addition of traffic signals at the intersections of Adams, Niagara, and Dolphin Streets (if warranted). 114131~|~1~|~1~|~01/ENH~|~Plan split for MPO 4TC7 funds. 114131~|~1~|~2~|~02/NFP~|~Plan split for project work using 100% Local funds. 122504~|~1~|~1~|~01/STR~|~Bridge replacement project on MRG 376 5.91 (SFN 5801656). Funded 80% Federal/20% State. 122504~|~1~|~2~|~02/NFA~|~Bridge replacement project on MRG 669 11.83 (SFN 5802150). Not on the federal aid system funded 100% State. 76807~|~1~|~1~|~01/IMS~|~100% UNFU plan split 103828~|~1~|~1~|~01/S>2~|~Pavement resurfacing of CR72 from CR10 to CR21. 103828~|~1~|~2~|~02/S>2~|~Pavement resurfacing of CR21 from CR106 to CR72. 103828~|~1~|~3~|~03/S>2~|~Resurfacing of CR21 and CR72. Cost in excess of cap amounts. 110770~|~1~|~1~|~01/STR~|~Landslide repair. MEG 124 63.33-63.36. Funded 100% State ER. 91785~|~2~|~5~|~05/IMS~|~Pavement repair on FAY-71-9.45 to 14.66 & MAD-71-0.00 to 4.56 (90% 4PF7/10% 4PS7) 91785~|~2~|~6~|~06/IMS~|~Bridge work on FAY/MAD-71 (90% 4PF7/10%4PS7)24021652402289240225424023192402343240240824023784902947490291249029714903064490309949031294903153/4903188 - joint sealer 91785~|~1~|~1~|~01/NHS~|~Minor pavement work and resurfacing on FAY-35-7.51 t0 12.05 (80% 4PF7/20%4PS7) 91785~|~1~|~3~|~03/NHS~|~Bridge work on FAY-35 (80% 4PF7/20% 4PS7)240089824009282400855240086324007902400839 91785~|~1~|~4~|~04/NHS~|~Pavement marking and RPM's on FAY 35 & 435 91785~|~1~|~2~|~02/STR~|~Pavement rehab and resurfacing on FAY-435-1.26to1.31 and 1.50 to 1.67 (80% 4PF7/20% 4PS7) 119793~|~1~|~1~|~01/S5K~|~All work is included in this split. 88505~|~1~|~3~|~03/S>2/Prbg~|~resurface WOO 65 13.92-17.71; Fed/Local - Perrysburg Corp Line to SR 25 88505~|~1~|~4~|~04/S>2/Prbg~|~plan split for 100% local items 88505~|~1~|~2~|~02/S>2~|~resurface WOO SR 65 13.59-13.92; URBAN - near Roachton Rd to Perrysburg Corp Line 88505~|~1~|~5~|~05/S>2~|~Bridges SFN 8702705 88505~|~1~|~1~|~01/STR~|~resurface WOO SR 65 11.99-13.59; RURAL - SR 64 to near Roachton Rd 97177~|~1~|~1~|~01/SAF~|~Reconstruct the traffic signal and intersection at Home Street to realign the intersecting roads and drives. 121692~|~1~|~1~|~01/SAF~|~Radar detectors. 116269~|~1~|~1~|~01/STR~|~Replace box beam superstructure 119161~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. 97358~|~1~|~1~|~01/NFP~|~Highway Lighting Maintenance 108020~|~1~|~1~|~01/SAF~|~Replace Loop Detectors with Radar Detection at:LOR-82 & Durkee RdLOR-82 & Island Rd 108020~|~1~|~2~|~02/SAF~|~Replace Loop Detectors with Radar Detection at:MED-303 & Stony Hill Rd 98573~|~1~|~3~|~03/S<2~|~Federal/State Urbanized Area Outside Corp. Limit (Paving Items Etc?): ASD-SR60 ? SLM 16.23 to 16.31(LT) SLM 16.38 to 16.51(LT) 98573~|~1~|~1~|~01/S<2~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items):ASD-SR60 ? SLM 16.23 to 16.31(RT) SLM 16.31 to 16.38 SLM 16.38 to 16.51(RT) SLM 16.51 to 19.70ASD-SR96 ? SLM 05.60 to 06.89ASD-SR42 ? SLM 03.63 to 03.80 98573~|~1~|~2~|~02/S<2~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, Etc?):ASD-SR60 ? SLM 16.23 to 16.31(RT) SLM 16.31 to 16.38 SLM 16.38 to 16.51(RT) SLM 16.51 to 19.70ASD-SR96 ? SLM 05.60 to 06.89ASD-SR42 ? SLM 03.63 to 03.80 98573~|~1~|~4~|~04/S<2~|~ASD-SR-60 16.850 SFN: 0301574 (over Jamison Creek)Preventive MaintenanceItem 512 ? Treating Concrete Bridge DecksItem 516 ? Expansion Joint Repair Minor RehabilitationApproach slab replacement/repair 105560~|~1~|~1~|~01/STR~|~Pavement Marking 105560~|~1~|~2~|~02/STR~|~Install 4.3 miles of edge line and centerline rumble stripes on ASD-60 from 11.71 (US 30) to 16.03 (City of Ashland) but no rumble stripes from 15.19 to 15.27 113293~|~1~|~1~|~01/SAF~|~Columbus Pedestrian Safety Improvement Program 82976~|~1~|~3~|~03/IMS~|~Correction of the existing superelevation on 4 existing curves for mainline travel. 82976~|~1~|~2~|~02/IMS~|~Overlay and misc bridge work to bridges including HAM-74-0979 (SFN 3108414), HAM-275-1070 (SFN 3116298), HAM-275-1080 L/R/S (SFNs 3116344/3116352/3116387), HAM-275-1290 (SFN 3116425), HAM-275-1345 (SFN 3116468), and HAM-275-1426 (SFN 3116565). 82976~|~1~|~1~|~01/IMS~|~Major Rehabilitation on a portion of IR 275 in Hamilton County from the overlap section with I-74 (SLM 10.57) to approximately milepost 34 (SLM 16.12). Includes all mainline pavement and ramps within the project limits. 108710~|~1~|~1~|~01/S<2~|~Landslide repair, ER Event OH18-01, DSR# BEL-026. 108710~|~1~|~2~|~02/S<2~|~Landslide Repair, ER Event OH18-01, DSR# BEL-027. 114306~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " - 4PF7 (80%) and 4PS7 (20%) - district wide spot pavement repair. 119936~|~1~|~1~|~01/SAF~|~Safety Items 113830~|~1~|~1~|~01/NFA~|~Created for J&C involvement 95864~|~1~|~1~|~01/NFP~|~@ SLM 15.74 92812~|~1~|~1~|~01/IMS~|~Maintenance and upkeep of the existing landscaping at the IR70/IR75 interchange in Montgomery County 96075~|~1~|~1~|~01/S<2~|~Bridge rehabilitation on FAI-SR 256-5.88 SFN 2303124 99449~|~1~|~1~|~01/NFP~|~Spot pavement repairs on assorted routes in POR,STA, SUM counties in District 4. 112554~|~1~|~2~|~02/S5K~|~Resurfacing on the Urban section 112554~|~1~|~1~|~01/STR~|~Resurfacing and bridge work for the Rural portion 104932~|~1~|~1~|~01/MPO~|~Work eligible for streetscape funding. 104932~|~1~|~2~|~02/NFP~|~Clark Avenue pavement rehabilitation using 100% local participation 102062~|~1~|~1~|~01/SAF~|~This plan split is for the curve locations within the City of Cincinnati. 107568~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project for FY 24 101255~|~1~|~1~|~01/SAF~|~Upgrade signals, signage and pavement markings, install sidewalks and provide bicycle parking, curb ramps on affected intersections in vicinity of school. 108964~|~1~|~1~|~01/S>2~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 80% ODOT and 20% City items on the Urban portion of US 127. 108964~|~1~|~2~|~02/S>2/MTH~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 100% City items on the urban portion of US 127. 94256~|~1~|~1~|~01/IMS~|~plan split for roadway work in the project:HAM-275: SLM 28.69-35.07 94256~|~1~|~2~|~02/IMS~|~Plan Split for widening the westbound median shoulder to be utilized as a SmartLane in peak times 94256~|~1~|~3~|~03/IMS~|~TSMO funded work for ITS devices 94256~|~1~|~4~|~04/NFA~|~retroactive fuel price adjustment 101773~|~1~|~1~|~01/MPO/SEBR~|~Resurfacing of 12th Street in the Village of Sebring (SLM 0.37 to 2.18). 101773~|~1~|~2~|~02/S<2/MAHC~|~Resurfacing of 12th Street adjacent to the Village of Sebring, work paid by the Mahoning County Engineer (SLM 0.00 to 0.37 and 2.18 to 2.23). 101773~|~1~|~3~|~03/STR/MAHC~|~Resurfacing of 12th Street adjacent to the Village of Sebring, work paid by the Mahoning County Engineer (SLM 2.23 to 2.49). 99418~|~1~|~1~|~01/MPO~|~Improve and increase the accessibility for cyclists, by adding bike racks throughout the city. 101476~|~1~|~1~|~01/MPO~|~Reconstruction of small portions of the Regional Bike Trails as a result of utility cuts, root heave and sub-surface conditions. The project will also include a complete micro-surface of the trails to extend the life of the trails making the most of the original investment to significantly extend the life of the trails. 116540~|~1~|~1~|~01/MPO/MACE~|~Resurfacing of Valley View Rd from Hudson Corp Limit to Twinsburg Rd, in the City of Macedonia, Summit County, Ohio. 92911~|~1~|~1~|~01/S<2~|~Bridge removal project. WAS-618-0098, SFN 8404747. Urban other federal aid funded 80 federal/20 state. 92911~|~1~|~2~|~02/STR~|~Landslide repair on the WAS 618 0.67 section. DSR WAS-004, 100% Federal ER funds. 89695~|~1~|~3~|~03/S>2~|~Split for items funded at 100% local cost 89695~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work on this project using MPO Enhancement funds. 89695~|~1~|~2~|~02/MPO~|~80/20 funding split to rehabilitate Larchmere Blvd from MLK Blvd to North Moreland Blvd. 116730~|~1~|~1~|~01/STR~|~Plan split for Rural roadway segments 116730~|~2~|~2~|~02/S5K~|~Plan split for roadway segments STP 5,000-49,999 119490~|~1~|~1~|~01/NFP~|~Repair of superstructure and guardrail 117674~|~1~|~1~|~01/BRF~|~Primary plan split for CEAO LBR funds. 93541~|~1~|~1~|~01/SAE~|~Project Locations: Kyles station between Aspen Valley & Lesourdsville West Chester. Aspenwood Dr. Aspen Trails Blvd. Woodmansee Way. Sugar Valley Pl. & Poets Way. Sugar Valley Pl. Cherokee Elem. School. Kyles Station Road & Lesourdsville West Chester Roads. Walton Creek between existing walk and Hamilton Mason Road. Walton Creek between Hamilton Mason to Barkwood Dr. 96247~|~1~|~2~|~02/STR~|~STP Rural. SLM 2.94-10.17; 4903609 MAD-142-0322 over Deer Creek; 4903633 MAD-142-0566 over Glade Run; 4903668 MAD-14-0597 over Sidner Ditch 96247~|~1~|~1~|~01/S<2~|~STP UP. SLM 0.19-2.94 London 108833~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. WAR-CR 196-1.01 (SFN: 8333556) which carries Edwardsville Road over Lick Run. 114413~|~1~|~1~|~01/NFP~|~Plan split for all sign replacements on project 119241~|~1~|~1~|~01/S5K~|~Marion Urban Area Plan Split 119241~|~1~|~2~|~02/STR~|~Rural Plan Split 109362~|~1~|~1~|~01/SAF~|~Safety program funded work to remove five at grade intersections and convert two to partial J-Turns on US 23. Funding is 90% federal safety program funds SAC 4HJ7 and 10% state safety program funds until the safety program cap is reached. Funds over the cap will cone from the District Preservation program budget. 76469~|~1~|~2~|~02/NHS~|~Work to add one extra lane in each direction 76469~|~1~|~1~|~01/IMS~|~Pavement rehab and shoulder widening of FRA-270: 9.15 - 15.96, Trabue to US-33 76469~|~1~|~4~|~04/NHS~|~Bridge widening work on 6 structures:2509571 FRA IR270 10.03 Intersect: Raymond Run2509601 FRA IR270 10.03 Intersect: Raymond Run2510081 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510111 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510200 FRA IR270 16.19 Intersect: Cramer Ditch2510235 FRA IR270 16.19 Intersect: Cramer Ditch 76469~|~1~|~5~|~05/NHS~|~Power charges from AEP 76469~|~1~|~6~|~06/IMS~|~Costs to repair damage due to vehicle accidents 76469~|~1~|~3~|~03/IMS~|~Bridge work on 10 structures (OL, seal, patching):2509571 FRA IR270 10.03 Intersect: Raymond Run2509601 FRA IR270 10.03 Intersect: Raymond Run2509725 FRA CR29 11.03 Intersect: Scioto Darby Cr.Rd & NS RR2509784 FRA CR29 11.03 Intersect: Scioto Darby Cr.Rd & NS RR2509873 FRA IR270 11.8 Intersect: over CSX RR2509903 FRA IR270 11.8 Intersect: over CSX RR2510081 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510111 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510200 FRA IR270 16.19 Intersect: Cramer Ditch2510235 FRA IR270 16.19 Intersect: Cramer Ditch 117445~|~1~|~1~|~01/SAF~|~Primary Plan Split for SRTS eligible scope items 112474~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " Plan Split 1 88908~|~1~|~1~|~01/STR~|~Bridge Superstructure replacements to SFN 7601948 STA-62-4.55 and SFN 7601965 STA-62-4.60, Minor bridge work to SFN 7601999 STA-62-4.68 all 3 structures over Branch of Sugar Creek. 110304~|~1~|~1~|~01/IMS~|~Demolition of buildings on two parcels. Only buildings in this contract shall be demolished in their entirety and debris/materials disposed of off-site. These building removals are required as part of the HAM-75-7.89 (PID 77889) project. 25596~|~1~|~1~|~01/IMS~|~Resurfacing on MAD-71 SLM 4.56-11.68 & PIC-71 SLM 0.00-3.1601/IMS/PV/ 25596~|~1~|~2~|~02/IMS~|~Minor bridge work - repairs and deck overlay4903153 MAD IR71 4.54 Intersect: Mud Run4903188 MAD IR71 4.54 Intersect: Mud Run4903277 MAD IR71 6.31 Intersect: Over Tr-66 (Dyer Rd.)4903307 MAD IR71 6.31 Intersect: Over Tr-66 (Dyer Rd.) 25596~|~1~|~3~|~03/IMS~|~Repairs and deck replacement on MAD-71-0688 L/R 25596~|~1~|~4~|~04/IMS~|~Add wet reflective pavement markings 25596~|~1~|~5~|~05/IMS~|~Cost to repair damage caused by vehicle accidents 118945~|~1~|~1~|~01/IMS~|~Lime City Bridge over I-75 NB 116839~|~1~|~1~|~01/S>2~|~Resurface Market St. 98713~|~1~|~1~|~01/NFP~|~Bridge over turnpike. 93267~|~1~|~1~|~01/BRO~|~- District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3001059 GUE IR70 6.55 Intersect: CR 15 #; BR Eligible for Rehabilitation: Length=114 SD/FO(1) SR=62.3 DSR=7 100469~|~1~|~1~|~01/NFA~|~This is for all the resurfacing work on TUS-751 from 0.00 to 3.99 100469~|~1~|~2~|~02/STR~|~Resurfacing of TUS-751 from the 3.99 to the 4.20 114904~|~1~|~1~|~01/NHS~|~NHS plan split 114255~|~1~|~1~|~01/S<2~|~Widening of N. Maple Street from Mechanic to Lexington to provide on-street parking. Reconstruction of pavement, addition of curb and gutter, and storm sewer. 114255~|~1~|~2~|~02/SAF~|~Replacement of existing deteriorated sidewalks and construction of new sidewalk on both sides of N. Maple Street, from Mechanic to Lexington. 101231~|~1~|~1~|~01/NFA~|~DEF Village of Hicksville A&P Tool 93147~|~1~|~2~|~02/S>2~|~Paving outside Delaware Corp. SLM 9.51 to 9.69 93147~|~1~|~1~|~01/S>2~|~Delaware urban paving of US-42, 8.78-9.51 93147~|~1~|~3~|~03/S>2~|~100% City items (ie pavement repair) 122328~|~1~|~1~|~01/NFP~|~Plan split for highway maintenance mowing contract throughout the district 101921~|~1~|~1~|~01/NHS~|~Emergency resurfacing project. GAL US 35 16.81-17.64 WB and 17.28-17.56 EB. 100% State funds. 88741~|~1~|~1~|~01/IMS~|~Districtwide Raised Pavement Marker program. 113597~|~1~|~1~|~01/NHS~|~Split for eligible paving work on the NHS 113597~|~1~|~2~|~02/NFA~|~Split for 100% local items 110095~|~1~|~1~|~01/IMS~|~FRA-270-48.47 to 52.16 105341~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 105341~|~1~|~1~|~01/IMS~|~Smooth seal 105341~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 118428~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction contract work items 118428~|~1~|~2~|~02/STR~|~Plan split for construction inspection items 118428~|~1~|~3~|~03/STR~|~Plan split for Detailed Design portion of Design Build Team's costs 106277~|~1~|~1~|~01/STR~|~Landslide repairs from 2017 flood event. MOE CR44 0.60-0.80, DSR MOE-002. Funded 100% federal ER funds. 103813~|~1~|~1~|~01/IMS~|~Culvert repair on Interstate route. 102369~|~1~|~1~|~01/NFP~|~Construct new parking lot on property owned by the Ashtabula County Metroparks. 124758~|~1~|~1~|~01/STR~|~Resurfacing project in Meigs County. CR 1 (12.786-15.490), CR 28 (9.612-10.522), CR 33A (0-3.403), CR 5 (0.000-1.662), CR 3 (7.408-13.564), CR 124 (0.488-0.836). 124758~|~1~|~2~|~02/S5K~|~Resurfacing project in Meigs County, CR 5 (1.662-2.253). 121895~|~1~|~1~|~01/BRF~|~Bridge Replacement on CR 4 over Opossum Run 99996~|~1~|~1~|~01/IMS~|~Split for work on interstate bridges 99996~|~1~|~2~|~02/NHS~|~Split for NHS bridge work 114885~|~1~|~1~|~01/NHS~|~HEN-6 113122~|~1~|~1~|~01/NHS~|~Resurfacing. 113122~|~1~|~2~|~02/S5K~|~Resurfacing. 113122~|~1~|~4~|~04/NHS~|~Bridge preventive maintenance. 113122~|~1~|~3~|~03/STR~|~Resurfacing. 113122~|~1~|~5~|~05/STR~|~Bridge preventive maintenance. 113122~|~1~|~6~|~06/STR~|~Minor bridge work 10' to 20' structure. 100766~|~1~|~6~|~06/NFA~|~Districtwide fast dry pavement marking contract on routes that are not on the Federal-Aid SystemSFAYSR00729**C 6.61 to 14.82SFAYSR00734**C 6.61 to 12.56SFAYSR00753**C 0.15 to 10.49SMADSR00187**C 0 to 4.83SMADSR00729**C 0 to 1.75SMARSR00100**C 0 to 2.89SMARSR00746**C 0 to 9.92SMRWSR00746**C 0 to 3.08 100766~|~1~|~5~|~05/STR~|~Districtwide fast dry pavement marking contract on non-NHS routes outside urban areasDEL-SR203-0.00 to 9.10 DEL-SR4-1.93 to 1.98 DEL-SR47-0.00 to 1.07 DEL-CR61-2.72 to 4.67 DEL-CR61-4.96 to 7.84 DEL-SR 229-0.00 to 8.56 100766~|~1~|~1~|~01/IMS~|~Districtwide fast dry pavement marking contract on Interstate routes.SDELIR00071**C 0.89 to 17.23SFAYIR00071**C 0 to 14.66SFRAIR00070**C 0 to 3.42SFRAIR00070**C 7.94 to 14.3SFRAIR00070**C 15.3 to 24.93SFRAIR00071**C 14.54 to 15.26SFRAIR00071**C 16.83 to 17.19SFRAIR00071**C 17.9 to 25.62SFRAIR00270**C 0 to 9.3SFRAIR00270**C 26.49 to 30.61SFRAIR00270**C 32.11 to 32.5SFRAIR00270**C 35.37 to 54.97SFRAIR00670**C 0 to 3.88SFRAIR00670**C 10.23 to 10.39SMADIR00070**C 0 to 8.62SMADIR00071**C 0 to 4.56SMRWIR00071**C 0 to 12.19 100766~|~1~|~2~|~02/NHS~|~Districtwide Fast Dry pavement markings on the NHS systemSDELSR00037**C 23.08 to 29.08SDELUS00023**C 0 to 7.29SDELUS00023**C 7.41 to 9.34SDELUS00023**C 13.08 to 13.35SDELUS00023**C 14.37 to 14.4SDELUS00023**C 14.79 to 20.07SDELUS00036**C 12.83 to 14.84SDELUS00036**C 17.09 to 18.5SDELUS00042**C 0 to 1.41SDELUS00042**C 2.29 to 4.27SDELUS00042**C 6.27 to 6.45SFAYUS00035**C 0 to 4.52SFAYUS00035**C 7.51 to 11.97SFAYUS00035**C 17.45 to 24.02SFRASR00315**C 8.62 to 12.45SFRASR00665**C 9.9 to 11.61SFRASR00665**C 11.89 to 12.24SFRASR00665**C 13.48 to 14.52SFRAUS00023**C 0 to 0.51SFRAUS00023**C 1.5 to 2.2SFRAUS00023**C 4.58 to 5.41SFRAUS00033**C 26.61 to 29.09SFRAUS00040**C 4.76 to 7.53SFRAUS00062**C 22.26 to 22.6SFRAUS00062**C 31.65 to 33.7SMADUS00042**C 12.81 to 25.15SMARSR00309**C 19.38 to 20.24SMARSR00309**C 20.79 to 22.65SMARUS00023**C 0 to 2.44SMARUS00023**C 7.61 to 9.74SPICSR00762**C 11.18 to 14.89SPICUS00023**C 0 to 23.16SUNISR00004**C 0 to 2.57SUNIUS00033**C 8.72 to 25.11SUNIUS00036**C 0 to 6.94SUNIUS00036**C 7.68 to 9.63SUNIUS00042**C 0 to 9.89 100766~|~1~|~3~|~03/S<2~|~Districtwide fast dry pavement marking contract on routes within small (S<2) urban areasSMADSR00056**C 0 to 6.19SMADSR00665**C 1.17 to 11.12SMADUS00042**C 0 to 4.86SMADUS00042**C 9.16 to 12.81SMARSR00004**C 1.79 to 10.01SMARSR00004**C 10.95 to 13.82SMARSR00095**C 0 to 13.1SMARSR00095**C 17.19 to 24.32SMARSR00098**C 9.68 to 10.96SMARSR00309**C 18.88 to 19.02SMARSR00423**C 0 to 8.5SMARSR00423**C 11.37 to 16.37SMARSR00529**C 2.59 to 9.29SMARSR00739**C 0 to 7.38SPICSR00056**C 0 to 17.36SPICSR00316**C 0 to 11.27SPICSR00316**C 11.55 to 13.05SPICSR00316**C 13.68 to 14.05SPICSR00762**C 0 to 3.01SPICUS00022**C 15.98 to 17.14SUNISR00031**C 2.09 to 7.08SUNISR00038**C 0 to 7.61SUNISR00245**C 0 to 7.65SUNISR00736**C 0 to 7.95SUNIUS00036**C 13.87 to 18.89 100766~|~1~|~4~|~04/S>2~|~Districtwide fast dry pavement marking contract on non-NHS routes within the Columbus Urban AreaSDELSR00003**C 1.38 to 8.74SDELSR00037**C 0 to 7.47SDELSR00061**C 0.43 to 2.72SDELSR00257**C 0 to 1.53SDELSR00257**C 4.12 to 4.56SDELSR00315**C 0.67 to 1.73SDELSR00521**C 2.29 to 13.62SDELSR00750**C 0 to 2.26SDELSR00750**C 4.21 to 4.46SDELUS00036**C 2.67 to 7.43SDELUS00036**C 22.17 to 28.61SDELUS00042**C 9.51 to 9.69SFRASR00003**C 20.39 to 21.36SFRASR00003**C 21.8 to 22.77SFRASR00003**C 22.91 to 23.04SFRASR00003**C 24.31 to 24.33SFRASR00003**C 24.35 to 25.01SFRASR00003**C 25.24 to 26.16SFRASR00605**C 1.71 to 3.17SFRASR00665**C 3.33 to 5.18SFRASR00665**C 7.39 to 8.59SFRAUS00040**C 0 to 4.02SFRAUS00062**C 0 to 1.64SFRAUS00062**C 2.97 to 5.63SFRAUS00062**C 8.07 to 8.54SFRAUS00062**C 10.8 to 11.69SMADUS00040**C 15.92 to 16.14SPICSR00674**C 8.96 to 10.93 91975~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7767862 Blackberry Drive Bridge over Brandywine Creek. 102239~|~1~|~1~|~01/STR~|~Bridge Replacement: HUR-601-01.85 SFN:3904474 87236~|~1~|~1~|~01/STR~|~BRO US59 0.00 - 8.37 Resurfacing ProjectOn US50, begin @ Clermont County line east to Highland County line (SLM 0.00 - 8.37), it is proposed to resurface the highway with aspahalt concrete.80/20 split 87236~|~1~|~2~|~02/STR~|~Joint repair.0800481 BRO US50 1.98 Intersect: Glady Run0800511 BRO US50 4.49 Intersect: E Fork Little Miami River 92843~|~1~|~1~|~01/BRF~|~Bridge replacement 114427~|~1~|~1~|~01/NHS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for SR 7 in Belmont and Jefferson counties. 92065~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 98996~|~1~|~1~|~01/NHS~|~All costs associated with painting and replacing the wearing surface of the HAM-50-1903L and HAM-50-1903R bridges. Railroad reimbursement for flaggers will be a separate funding event. 94375~|~1~|~1~|~01/ENH~|~Landscaping and signing enhancement to the SR-711 at US-422 interchange in the City of Youngstown, Mahoning County, Ohio. 115198~|~1~|~1~|~01/SAF/COL~|~Guardrail repair/replacement on multiple county roads with 100% CEAO Safety (4HB7). 94181~|~1~|~1~|~01/S<2~|~London urban paving on SR-56 & SR-38 / Main St 109771~|~1~|~1~|~01/IMS~|~AC Overlay with Repairs. 122395~|~1~|~1~|~01/NFA~|~Plan split for paving work in Harrison Lake State Park 100257~|~1~|~1~|~01/MPO~|~Rehabilitate Lakewood Heights Blvd using MPO STP funds. 119092~|~2~|~1~|~01/NHS~|~Resurfacing WAS-7-7.18-14.03 83622~|~1~|~1~|~01/STR~|~80/20 funding split for federal rural STP funds. 120294~|~1~|~1~|~01/SAF/STCE~|~Guardrail upgrades on various routes throughout Stark County. 121424~|~1~|~1~|~01/NHS~|~All interchange work included in this split. 107720~|~1~|~1~|~01/NFA~|~Slide repair BRO 221 6.77 113294~|~1~|~1~|~01/NFP~|~Overlay existing parking lot with asphalt concrete along with striping, pavement repairs and minor drainage repairs. 119004~|~1~|~1~|~01/BRF/TRCE~|~Superstructure replacement. 116384~|~1~|~1~|~01/IMS~|~BEL-70 91458~|~1~|~1~|~01/STR~|~Resurfacing with an asphalt overlay with repairs. MRG SR 60 9.36-21.83. Minor Art., Fed. Aid Route. Federal 80%/State 20%. 94547~|~1~|~1~|~01/BRF~|~The project will replace the existing pre-stressed concrete beam bridge deck over the North Branch of Sycamore Creek. 97592~|~1~|~1~|~01/STR~|~LAW SR 217 (SLM 5.92-5.98) Slide Repair 103701~|~1~|~1~|~01/SAF~|~Sidewalk and ped heads at 100% 4SC7 (includes 20% TRC) 91705~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. NHS route funded 80 federal/20 state. HOC US 33 and ATH US 33 91705~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. Rural other federal aid funded 80 federal/20 state. HOC SR 328 and HOC SR 595. 91705~|~1~|~3~|~03/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment. 89278~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for STP funds 89278~|~1~|~3~|~03/S>2~|~100% local participation for the pavement replacement work and other work items not eligible for urban resurfacing funding. 89278~|~1~|~2~|~02/S>2~|~Split for slope repair work using GSM funding 89489~|~1~|~2~|~02/STR~|~Culvert Split 80/20 Fed/State:MRW-314-14.41; MRW-97-4.50; MRW-288-3.90; MRW-288-4.61 89489~|~1~|~1~|~01/STR~|~Geotechnical $'s (4SF7/4SS7) for slope and ditch work01/STR/OT/GEO 89489~|~1~|~3~|~03/IMS~|~Line culvert at MRW-71-19.34 88276~|~1~|~1~|~01/SAE~|~Signal upgrade in the City of Cleveland using 100% Safety funding. 119274~|~1~|~1~|~01/STR~|~Replace deck on structure over the Little Darby Creek (SFN 8001952) 88783~|~1~|~2~|~02/NHS~|~District Preservation funding split to participate in the painting of bridges HAM-27-1182 (SFN 3118010) and HAM-27-1184 (SFN 3118002) that carry Ronald Regan Highway (CR 453) over Colerain Ave (US 27). This plan split is only for the costs associated with the painting and MOT caused by the painting. This funding split does not include costs for overlays on these bridges or other bridges. Agreement per 5/13/13 meeting with HCEO and Colerain Twp is that the Colerain Twp will pay $50,000 (capped), and ODOT and HCEO will split the remaining $500,000 for the painintg. ODOT's funds will be capped at $250,000 since this is a local let project. 88783~|~1~|~1~|~01/NHS~|~Ronald Reagan Cross County Highway: from the Springdale Road overpass to 1000 ft. east of US-27/Colerain Ave. Project includes pavement rehabilitation/resurfacing, guardrail replacement, upgrades to lighting, and new pavement markings. 88783~|~1~|~3~|~03/BRO~|~Bridge rehabilitation including removal and replacement of expansion joints, replacement of bridge deck wearing surfaces, painting of structural steel, etc. 117435~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 97324~|~1~|~1~|~01/STR~|~Culvert replacement project. Rural other federal aid funded 80 federal/20 state. 89259~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for Urban Paving funds 89259~|~1~|~2~|~02/NFP~|~Split 2 for 100% local cost for items of work not eligible for urban paving 89259~|~3~|~3~|~03/NHS~|~Fuel price adjustment 106710~|~1~|~1~|~01/ENH~|~Construction of a multipurpose trail. 106929~|~1~|~1~|~01/STR~|~Prevailing wage tree cutting contract. 96352~|~1~|~1~|~01/SAF~|~safety funded project on IR-280 and SR 420 85100~|~1~|~1~|~01/MPO~|~LUC CR508 0.6-1.34 112375~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 118902~|~1~|~1~|~01/SAF~|~CEAO HSIP funding for safety improvements 97551~|~1~|~2~|~02/BRF~|~Ohio Bridge Partnership Program. SFN 4740017, Snell Road 97551~|~1~|~1~|~01/BRO~|~Ohio Bridge Partnership Program. SFN 4738411, Parsons Road 90360~|~1~|~1~|~01/STR~|~Culvert Replacement 89345~|~1~|~1~|~01/S<2~|~This Plan Split is for the road reconstruction work eligible for federal funds from the small cities program. 89345~|~1~|~2~|~02/S<2~|~The Plan Split is for 100% locally funded utility work that is not eligible for federal funds. 114000~|~1~|~1~|~01/NFA/GCEO~|~"01/NFA/PV/GCEO" - 80% Federal (4B77) and 20% Local (LNTP) - resurfacing of minor collectors - CR 73, CR 670, CR 690. 114000~|~1~|~2~|~02/STR/GCEO~|~"02/STR/PV/GCEO" - 80% Federal (4B77) and 20% Local (LNTP) - Resurfacing and related work on CR 57. 97596~|~1~|~1~|~01/NFP~|~Split 1 - Airport improvements 106249~|~1~|~1~|~01/NFA~|~The Township will extend Southwest Parkway 475 Linear Feet to the south from its existing terminus and match the existing road profile as to width, curbs and gutters, drainage and other features. 122801~|~1~|~1~|~01/NFA~|~GR replacement in Highland County. 112754~|~1~|~1~|~01/MPO~|~Resurfacing of Johnson Rd from Hametown Rd to Norton East Corp Limit in the City of Norton. 110540~|~1~|~1~|~01/STR~|~Resurfacing the Rural section of PRE-127 in the project and the bridge expansion joint work. PRE-127 SLM 4.589 to 11.194 110540~|~1~|~2~|~02/S5K~|~Resurfacing the urban section of PRE-127 in the project: roughly SLM 11.19 - 12.04 100671~|~1~|~2~|~02/S<2~|~Chip Seal of SR 164 from SLM 15.67 to 16.87 100671~|~1~|~3~|~03/NFA~|~Chip Seal on COL-164 from SLM 16.87 to 18.00 100671~|~1~|~1~|~01/STR~|~Chip sealing on COL-154 and on COL-164 from SLM 4.46 to 9.78. 98393~|~1~|~3~|~03/S<2~|~Minor Bridge work > 20' span. 98393~|~1~|~4~|~04/STR~|~Minor bridge work > 20' span. 98393~|~1~|~2~|~02/STR~|~Resurfacing of STA SR 225 from 1.15 to 4.24. 98393~|~1~|~1~|~01/S<2~|~Resurfacing of STA SR 225 from 0.78 to 1.15. 91466~|~1~|~1~|~01/SAE~|~Remove the slip ramp from the eastbound exit of IR275 to US22 and replace with standard right turn lane. Safety funds 120443~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 83872~|~1~|~2~|~02/STR~|~JAC SR139 0.00 - 14.42Bridge Rehab4002466 JAC SR139 1.04 Intersect: Holland Fork Creek4002717 JAC SR139 9.87 Intersect: Br. of Four Mile Creek80/20 split02/STR/BR/State 83872~|~1~|~1~|~01/STR~|~JAC SR139 0.00 - 14.42 ResurfacingOn SR 139, begin project at the Scioto County line, head north and terminate at the south corp limit of the City of Jackson, it is proposed to resurface the existing pavement w/asphalt concrete to maintain the structural integrity and provide a smoother ride. Brdg pave thru.4002490 JAC SR139 3.17 Intersect: Trib of Holland Fork4002636 JAC SR139 9.16 Intersect: Br Of Four Mile Creek4002687 JAC SR139 9.76 Intersect: Four Mile Creek4002733 JAC SR139 10.22 Intersect: Br Of Four Mile Creek4002768 JAC SR139 10.52 Intersect: Branch Of Fourmile Creek4002857 JAC SR139 12.45 Intersect: Macdowell Run80/20 split01/STR/PV/State 93137~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Per-SR 155-00.00 to 07.45 2)Per-216-0.00 to 01.88 3)Per-595-00.00 to 02.10 4)Per-93-01.07 to 3.90 114842~|~1~|~1~|~01/IMS~|~Remove the abandoned RxR bridge over Interstate 75. 97054~|~1~|~1~|~01/NHS~|~Culvert replacement CFN 760623830 STA-US 62-29.53 96535~|~1~|~1~|~01/IMS~|~Emergency project to repair bridge deck patch that is failing. 93563~|~1~|~1~|~01/NFA~|~Design Build Project for the construction of a new salt barn at the Wilgus Outpost. 100% State (4MA7) 01/NFA/OT/State 114627~|~1~|~1~|~01/S<2~|~Overlay on ROS 138. 114627~|~1~|~2~|~02/STR~|~Overlay on ROS 138. 93139~|~1~|~1~|~01/S<2/MTVE~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Urban Paving resurfacing with associated work on Kno-SR 3-17.82 to 18.95 93139~|~1~|~2~|~02/S<2~|~District Preservation Paving Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Kno-SR 3-18.95 to 20.59 93139~|~1~|~3~|~03/STR~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Kno-SR 3-20.59 to 34.71 93139~|~1~|~4~|~04/SAF~|~Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - installation of centerline rumble strip. 88771~|~1~|~1~|~01/BRO~|~Replace deteriorated bridge deck with minimal approach work. Includes repair of pier columns and miscellaneous steel and concrete repair on SFN 5704359 MOT SR 49 0898 R over Interstate 70. 118425~|~1~|~1~|~01/STR~|~WAY SR 0057 06.73 87796~|~1~|~1~|~01/NHS~|~SCI US52 38.34 Intersection Improvement 1.29 miles west of the Scioto/Lawrence County Line Project Description: It is proposed to add a two left turn lanes and one right lane at the intersecions of US52 and Haverhill - Ohio Furnace Road (CR8). Legislation will be required and there is a railroad involved. 80 Fed/20 State 01/NHS/PV/State 105761~|~1~|~1~|~01/BRF~|~Federally eligible items for the replacement of bridge (SFN 2534231) 112728~|~1~|~1~|~01/MPO~|~Install sidewalks along East Cook Road 105845~|~1~|~1~|~01/IMS~|~Added plan split. 107555~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 107741~|~1~|~1~|~01/NHS~|~Landslide repair on WAS 7 41.7-41.85. 100% State Emergency funded (4BE7). NHS Route. 101225~|~1~|~1~|~01/NHS~|~CO CO Contr 01 plan split 1 created for the following NHS routes: FRA-40-3.15-4.69 FRA-62-8.56-10.67 101225~|~2~|~2~|~02/STR~|~CO CO Contr 02 plan split 2 created for the following STP Rural routes: FRA-315-2.37-5.18 101225~|~1~|~3~|~03/NHS~|~CO CO Engr 01 plan split 1 created for the following NHS routes: FRA-40-3.18-4.69 FRA-62-8.56-10.67 101225~|~1~|~4~|~04/STR~|~CO CO Engr 02 plan split 2 created for the following STP Rural routes: FRA-315-2.37-5.18 107022~|~1~|~1~|~01/IMS~|~Bridge Split 76007~|~1~|~1~|~01/CMQ~|~Plan Split for CMAQ Funding 76007~|~1~|~2~|~02/S>2~|~Plan Split for Local Funding for City of Canton for non-warranted signals 118857~|~1~|~1~|~01/STR~|~added plan split. 107999~|~1~|~1~|~01/NFP~|~Guardrail. 107999~|~1~|~2~|~02/BRO~|~Bridge railing hit in an accident and requires repairs. Replace damage deck edge and railing. 97255~|~1~|~1~|~01/STR~|~District wide herbicidal spray project 99945~|~1~|~1~|~01/STR~|~Culvert Replacement 112239~|~1~|~1~|~01/IMS~|~Landscape maintenance at various interchanges 93230~|~1~|~1~|~01/MPO~|~Increase storage lane lengths to improve safety and minimize the blocking traffic. Work will be done between the existing bridge piers by reducing the lane widths to 11' and removing the concrete median. Eight foot shoulders will be maintained and will accomodate bike lanes. The left turn lanes are extended beyond the ramp intersections by removing the existing raised median on I-675 and Wilmington Pike Interchange. 119054~|~1~|~1~|~01/IMS~|~All work included in this split. 112592~|~1~|~1~|~01/IMS~|~resurfacing on CLI-71 97002~|~1~|~1~|~01/NFP~|~Pipe replacement, Hiram Township, Portage County, Ohio. 112503~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 112503~|~1~|~2~|~02/NFP~|~Retro fuel price adjustment 123989~|~1~|~1~|~01/ENH~|~New sidewalk throughout the Village of Zaleski connecting to the Moonville Rail Trail trail head. 100955~|~1~|~1~|~01/S<2~|~Install sidewalk on the south side of Barrington Rd. 120750~|~1~|~1~|~01/NFA~|~Created for J&C involvement 99880~|~1~|~1~|~01/SAF~|~Construction of a westbound left turn lane from Tylersville Road (CR-20) to southbound Chantilly Drive (TR-1824). 99880~|~1~|~2~|~02/NFP~|~Plan split for 100% waterworks items included in this project. 92961~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation Pavement Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on OFAH-Rural route Kno-SR 95-00.00 to 05.69 92961~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work: 1) Kno-SR 13-11.81 to 12.06; 2) Kno-SR 13-12.08 to 16.00; 92961~|~1~|~3~|~03/NHS/MTVE~|~"03/NHS/PV/MTVE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Mount Vernon on the following NHS Routes: 1) Kno-SR 13-09.15 to 11.81; 2) Kno-SR 13-12.06 to 12.08; 3) Kno-SR 13D-00.19 to 00.51 120454~|~1~|~1~|~01/NHS~|~Culvert replacement. 120454~|~1~|~2~|~02/S5K~|~Culvert replacement. 96495~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement contract for FY 2017. WAS 618 2.24-3.00. Urban other federal aid funded 80 federal/20 state. 96495~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2017. Routes include: MOE 26 0.00-14.60, MOE 536 5.29-6.35, MRG 377 4.27-4.61, VIN 124 4.63-4.83, VIN 160 8.45-17.25 and WAS 26 2.64-29.36. Rural other federal aid funded 80 federal/20 state. 100479~|~1~|~2~|~02/S<2~|~SCI 239 (0.72-1.22) 100479~|~1~|~1~|~01/STR~|~SCI 239 (0.00-0.72) 100479~|~1~|~3~|~03/NHS~|~SCI 52 (8.67-15.77) 104946~|~1~|~1~|~01/IMS~|~Bridge Concrete Deck Overlay on FRA-62-21.81 116238~|~1~|~1~|~01/NHS~|~Smoothseal in ROS. 116238~|~1~|~2~|~02/NHS~|~Added bridge preventative maintenance. 114613~|~1~|~1~|~01/SAF~|~Construct a single-lane roundabout at Elk Creek Road in Middletown. 114613~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded utility work, funded by Southwest Regional Water District. 102835~|~1~|~1~|~01/STR~|~Smoothseal; MRW-95-8.13 to 15.33; MAR-309-22.77 to 29.21; MRW-3090.00 to 2.48 102215~|~1~|~1~|~01/STR~|~LAW CR 31 3.16 ER Slide repair. 115608~|~1~|~1~|~01/NFP~|~Mowing. 119700~|~1~|~1~|~01/SAF~|~Construct sidewalk on the north side of W Plane St (SR-125) in the Village of Bethel. Project to include pedestrian curb ramps and crosswalks. 122037~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 122084~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR 70 1.957, SFN 5833256. 96753~|~1~|~2~|~02/S<2~|~HEN-6 Urban section (10.94 to 14.97) 96753~|~1~|~1~|~01/STR~|~HEN-6 rural section (14.97 to 17.22) 98965~|~1~|~1~|~01/IMS~|~Split for culvert work 95778~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 6.98 95778~|~1~|~4~|~04/S<2~|~Urban Paving Split: SEN 100 8.3-8.9 & 9.3-9.84SEN-53-8.36-8.63 95778~|~1~|~3~|~03/STR~|~SEN-100-3.89 Bridge 95778~|~1~|~2~|~02/S<2~|~Sen 100 From SLM 6.98 to SLM 8.30 121890~|~1~|~1~|~01/ENH/ACMP~|~Construct new shared path. 111844~|~1~|~1~|~01/BRO~|~KYTC's Share of the project. 111844~|~1~|~2~|~02/BRO~|~OH's Share of the project. 97457~|~1~|~1~|~01/SAF~|~This plan split addresses all work required to demolish a house that was purchased to improve sight distance at this intersection. 119866~|~1~|~1~|~01/STR~|~All Work Included in this Split 95875~|~1~|~1~|~01/IMS~|~from SLM 0.56 to SLM 8.95 117743~|~1~|~1~|~01/NFP~|~Rest area project. All work is included in this split. 91765~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. VIN 93 2.15-7.47, 10.25-14.53. Rural other federal aid funded 80 federal/20 state. 91765~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using a microsurfacing treatment. VIN 93 0.61-2.15. NHS route funded 80 federal/20 state. 77419~|~1~|~1~|~01/IMS~|~100% state funding split with bond and Major Bridge funds for the deck replacement of SFN 1806173 (CUY-77-0950) over the Cuyahoga River, SR-17, Canal Road, and CSX railroad. 77480~|~2~|~2~|~02/NHS~|~CRA-30 Bridge Work 77480~|~1~|~1~|~01/NHS~|~CRA-30-4.24-9.92 - Resurfacing 77480~|~1~|~3~|~03/STR~|~CRA-98-9.23-9.39 resurfacing in rural section 77480~|~1~|~4~|~04/S<2~|~CRA-98-9.39-9.83 resurfacing in urbanized section. 109632~|~1~|~1~|~01/STR~|~Emergency repair on BRO 41 2.81. 96630~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds SAC 4PS7. 75945~|~1~|~1~|~01/IMS~|~Plane and resurface the existing roadway and other roadway related items on MOT IR 675 0.00 to 7.44 in Centerville from the junction of Interstate 75 to the Greene//Montgomery County Line. 75945~|~1~|~2~|~02/IMS~|~Bridge repair as follows:SFN 5710707 - MOT-675-0055 L - joint sealerSFN 5710731 - MOT 675-0063 Y - curb remove and replaceSFN 5710766 - MOT-675-0063 L - joint sealer & patching concrete structure, as per planSFN 5710804 - MOT-675-0063 R - joint sealer & patching concrete structure, as per planSFN 5711193 - MOT-675-0299 R - polymer modified joint systemSFN 5711185 - MOT-675-0299 L - polymer modified joint systemSFN 5711274 - MOT-675-0411 R - joint sealer & patching concrete structure, as per planSFN 5711266 - MOT-675-0411 L - joint sealer & patching concrete structure, as per planSFN 5711479 - MOT-675-0742 R - curb removal and replacementSFN 5711460 - MOT-675-0742 L - curb removal and replacement 124268~|~1~|~1~|~01/ENH~|~Trail resurfacing and trestle (trail) bridge work 91989~|~1~|~2~|~02/STR~|~LAW SR243 Brdgs F/Rehab:4403274 LAW SR243 4.98 Intersect: Trib Of Little Ice Creek4403304 LAW SR243 5.18 Intersect: Trib Of Little Ice Creek4403339 LAW SR243 5.48 Intersect: Trib Of Little Ice Creek4403371 LAW SR243 5.67 Intersect: Trib Of Little Ice Creek4403398 LAW SR243 6.1 Intersect: Ice Creek4403428 LAW SR243 6.25 Intersect: Trib Of Little Ice Creek4403452 LAW SR243 6.49 Intersect: Trib Of Little Ice Creek80/20 split 91989~|~1~|~5~|~05/S<2~|~LAW SR243 Brdgs F/Rehab:4403223 LAW SR243 1.77 Intersect: Little Ice Creek80/20 split 91989~|~1~|~4~|~04/NHS~|~LAW SR243 Brdgs F/Rehab:4403185 LAW US52 0.19 Intersect: Us Route 5280/20 split 91989~|~1~|~3~|~03/S<2~|~LAW SR243 Resurfacing ProjectUrban Area portion: SLM 0.16 - SLM 2.58Brdgs F/Pave Thru:4403207 LAW SR243 0.76 Intersect: Stream80/20 splitExtra Work from 3rd St to SLM 0.16 along Kinley Ave. (Bridge Pavement Approach) 91989~|~1~|~1~|~01/STR~|~LAW SR243 Resurfacing ProjectRural portion: SLM 2.58 - SLM 7.22Brdgs F/Pave Thru:4403452 LAW SR243 6.49 Intersect: Trib Of Little Ice Creek80/20 split 122750~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 88940~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 11 from 7.68 to 9.97 116860~|~1~|~1~|~01/CMQ/NILE~|~Signal replacements. 90784~|~1~|~1~|~01/BRF~|~Rehabilitate the structurally deficient bridge and widen the structure to accommodate a left turn lane as well as a bicycle lane (Harshman Road Bridge over the Mad River SFN 5761166 MOT MR **C 0.00 114769~|~1~|~1~|~01/NHS~|~SCI 23 overlay. 114769~|~1~|~2~|~02/STR~|~Added STP Rural plan split. 94021~|~1~|~2~|~02/NHS~|~Minor bridge work >20' span. 94021~|~1~|~3~|~03/NHS~|~Minor bridge rehab > 10' to 20' span. 94021~|~1~|~1~|~01/NHS~|~Resurfacing. 110100~|~1~|~1~|~01/SAF~|~Plan split for traffic signals 87941~|~1~|~1~|~01/BRO~|~4807774 LUC IR475 8.03 Intersect: Cr 22-Bancroft Street 117268~|~1~|~1~|~01/STR~|~Plan split for extrusheet signs 122086~|~1~|~1~|~01/BRF~|~Bridge replacement 114669~|~1~|~1~|~01/STR~|~Project to repair bridge GRE-380-3.31 that carries SR 380 over Caesar Creek by replacing the wearing surface, and bridge GRE-380-0627 that carries SR 380 over Glady Run by repalcing the wearing surface and painting the structural steel. 113922~|~1~|~1~|~01/IMS~|~District Preservation Pavement Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing work on a portion of LIC IR 70 and MUS IR 70. 113922~|~1~|~2~|~02/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Rehabilitation of Interstate bridges on a portion of LIC IR 70 and MUS IR 70. 113922~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 114615~|~1~|~1~|~01/NFP~|~Plan split for signal maintenance 109482~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 92842~|~1~|~1~|~01/BRF~|~bridge replacement 102449~|~1~|~1~|~01/STR~|~LAW 217 17.38 Culvert Replacement 109831~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in POR, STA and SUM counties. 114474~|~1~|~1~|~01/STR~|~Resurfacing SR 800 from HAS Co. Line to SLM 7.49 114474~|~1~|~2~|~02/S<2~|~Resurfacing SR 800 from SLM 7.49 to SLM 7.51 107294~|~1~|~1~|~01/S<2~|~ROS 28 0.00-0.96 107294~|~1~|~2~|~02/STR~|~ROS 28 0.96-6.00 107294~|~1~|~3~|~03/STR~|~Bridge pm. 95561~|~1~|~1~|~01/STR~|~HIG 72 0.00-3.98HIG 72 4.56-6.71 91025~|~1~|~1~|~01/IMS~|~Mill & Fill the existing pavement with asphalt concrete on MOT IR 70 15.08 0.61 mile West of IR 75 to SLM 17.34 (Rear abutment of MOT IR 70 17.34). 100919~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 35 3.80-13.42 and HOC 33 9.43-14.69. NHS route, funds are 80% Federal and 20% State. 100919~|~1~|~3~|~03/NFP~|~Resurfacing of the Gallia US 35 (10-35 & 10-36) rest areas. Funded 100% state. 100919~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 850 0.00-5.40. Major rehab funds 80 federal/20 state. Over is preservation funds. 100919~|~1~|~4~|~04/SAF~|~Recessed wet reflective markings on GAL 850 for 68.27 miles. Safety funded. 118631~|~1~|~1~|~01/STR~|~Landslide repair. 96148~|~1~|~1~|~01/NFA~|~New full service facility in Preble County. 82840~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. MOE 7 12.28-21.13 and MOE 536 0.00-0.24. Includes bridge ramps. NHS route funded 80 federal/20 state. 105309~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate bridge. 105309~|~1~|~2~|~02/STR~|~Bridge repair. 105309~|~1~|~3~|~03/S<2~|~Bridge repair 88321~|~1~|~1~|~01/S<2~|~Project involves the upgrade and interconnection of traffic signals at 11 signalized intersections along US-127 and US-35. 116835~|~1~|~1~|~01/S>2~|~Improve roadway geometry, stabilize the hillside along edge of road, and provide drainage improvements and other roadway repairs. 116974~|~1~|~1~|~01/MPO~|~Plan Split 1 - Roadway reconstruction work 116974~|~1~|~2~|~02/MPO~|~Plan Split 2 for Ped/Bike related work that is off-road 116974~|~1~|~3~|~03/NFP~|~Plan Split for locally funded water line work 87235~|~1~|~1~|~01/S<2~|~This split is for work done using federal urban STP funds. The Group is Bridge as the structure meets the state definition of a bridge. It does not meet the federal definition of a bridge. Therefore, BR funds cannot be used. 87235~|~1~|~2~|~02/NFP/DEF~|~Utilities work added to the project at the request of the City of Defiance. 100% of the funds will be provided by the City of Defiance. 87399~|~1~|~1~|~01/MPO~|~Project will improve separation of mainline I-71 traffic from the NB exit ramp traffic to Mason-Montgomery Road by extending the ramp gores. Gores will be extended using a physical barrier. 97660~|~1~|~1~|~01/NFA~|~Resurfacing of HAS-646 from SLM 10.44 to SR 9, including asphalt overlay, pavement repairs and pavement markings. 103976~|~1~|~1~|~01/ENH~|~Rehabilitation of the Hocking Valley Scenic RR. Federal TAP funds at 80% rate, 15% of TRC and 5% local. Final funding is 95% Federal and 5% Local. 107930~|~1~|~1~|~01/ENH~|~Summit MetroParks Freedom Trail. 107930~|~1~|~2~|~02/BRO/AKRO~|~Bridge major preventive maintenance. 107930~|~1~|~3~|~03/NFA~|~Steam Utility 117643~|~1~|~1~|~01/BRF/WCEO~|~Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459) 109624~|~1~|~1~|~01/STR~|~Resurfacing of SR 331 104478~|~1~|~1~|~01/NFA~|~Erie Township & Ottawa County 102853~|~1~|~1~|~01/NFA~|~D09 Bridge Maintenance FY21 111576~|~1~|~1~|~01/IMS~|~Slope repair on TRU-IR 80-10.99 (Westbound). 101547~|~1~|~1~|~01/NHS~|~Split for work on the NHS 101547~|~1~|~2~|~02/SAF~|~Use safety funding to install a curb for a permanent lane channelization for SR-91 SB traffic just south of US-422 EB exit ramp and Bob Evans driveway. 101547~|~1~|~3~|~03/NFP~|~100% local participation on work items that are not eligible for federal-aid. 97356~|~1~|~1~|~01/NFP~|~Guardrail Maintenance 87139~|~1~|~1~|~01/IMS~|~MAD-70: 8.62-15.57 minor pavment rehab 87139~|~1~|~2~|~02/IMS~|~MAD-70-12.17L SFN 4902610 Over Little Darby Creek deck sealingMAD-70-12.17R SFN 4902645 Over Little Darby Creek deck sealingMAD-70-12.83 SFN 4902734 under Taylor Blair Rd SRS overlayMAD-70-13.86 SFN 4902769 under Middle Pike Rd SRS overlayMAD-70-15.56L SFN 4902858 Over Big Darby Creek SDC overlayMAD-70-15.56R SFN 4902882 Over Big Darby Creek SDC overlay 104833~|~1~|~1~|~01/S>2~|~Convert 4 lane section to 3 lane section in the City of Springfield. 115699~|~1~|~1~|~01/STR~|~Split for rural STP paving 94791~|~1~|~1~|~01/NFA~|~Install decorative lighting and conduit on both sides of Main Street. Upgrade current sidewalks to include ADA compliance requirements and minor drainage improvements. 123021~|~1~|~1~|~01/ENH~|~HOCKING VALLEY SCENIC SUBPHASE 1 122263~|~1~|~1~|~01/STR~|~Safe Routes to School - sidewalks, RRFBs & crosswalks 88222~|~1~|~1~|~01/ENH~|~Replace RW fence with decorative fence, install curbing around existing grass median areal to the West of IR 75 bridge; excavate the painted median East of the bridge and add curbing and topsoil to create a planting area; install curb at the pavement edge immediately adjacent to the bridge area on either side; plan medians and shoulder embankment areas with native trees and brush species on US 36 from Scott Drive to Looney Road. MIA 26 SLM 11.57 to 11.94. 98865~|~1~|~1~|~01/MPO~|~Resurfacing State Road in the City of New Franklin. 113755~|~1~|~1~|~01/NFP~|~Created for J&C involvement 123648~|~1~|~1~|~01/IMS~|~Bridges on Interstate 123648~|~1~|~2~|~02/NHS~|~only NHS bridges. BUT-129 93576~|~1~|~1~|~01/SAF~|~Signal project in the City of Vermilion 93576~|~1~|~2~|~02/SAF~|~100% City of Vermilion Items 99704~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark, and Summit Counties. 101707~|~1~|~1~|~01/S>2~|~Resurfacing of Salt Springs Rd from Elsworth-Bailey Rd to SR 45, South Leavitt Rd from Palmyra to Hewitt-Gifford Rd both routes in the Village of Lordstown, Trumbull County, Ohio. 92792~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete MOT US 35 SLM 15.07 (IR 75) to SLM 18.57 (Livingston Avenue). 76462~|~1~|~1~|~01/NHS~|~SLM 0.00 to 5.21 Pavement repairs. SLM 5.21 to 12.92 pavement minor rehab excluding SLM 5.21 to 5.7801/NHS/PV/ 76462~|~1~|~2~|~02/NHS~|~Bridge rehab - SRS overlay on 9 structures:6500668 PIC US23 7.98 Intersect: Over NS RR6500692 PIC US23 7.98 Intersect: Over NS RR6500722 PIC US23 8.76 Intersect: Over US 22-17266500757 PIC US23 8.98 Intersect: Hargus Creek6500781 PIC US23 8.98 Intersect: Hargus Creek6500870 PIC US23 10.38 Intersect: Over CSX RR(Old C&O)6500900 PIC US23 10.38 Intersect: Over CSX RR(Old C&O)6500935 PIC US23 11.7 Intersect: Griffys Run6500994 PIC US23 11.7 Intersect: Griffys RunNot BR eligible02/NHS/BR/ 76462~|~2~|~3~|~03/SAF~|~Part 2-realign left turn lanes at Dupont Rd/Pittsburgh Rd, reconstruct signal and mill & fill from SLM 5.21 to 5.78 86973~|~1~|~1~|~01/ENH~|~Enhancement of the Indian Ripple Road & I-675 interchange area through the planting of shade trees, evergreens, and perennial flowers. Additionally, the project involves some minor grading work and the installation of decorative retaining walls to provide suitable planting beds. The location and size of all plantings and retaining walls shall comply with ODOT's landscaping guidelines. 106773~|~1~|~1~|~01/NHS~|~Split for highway lighting replacement and guardrail repair; 95% federal 5% local. 122074~|~1~|~1~|~01/ERD/MASS~|~Corridor improvement. 100909~|~1~|~1~|~01/NHS~|~This split is for culvert work on NHS route. 100909~|~1~|~2~|~02/IMS~|~This plan split is for culvert work on Interstate Route. 100909~|~1~|~3~|~03/STR~|~This plan split is for culvert work on Rural Routes. 100909~|~1~|~4~|~04/NFA~|~This plan split is for culvert work on Non-Federal Routes. 102888~|~1~|~1~|~01/NFA~|~BRO 763 0.65 117563~|~1~|~1~|~01/SAF~|~Construction of a roundabout at the intersection of Trebein Road, Dayton-Xenia Road, and Hilltop Road. 110365~|~1~|~1~|~01/NFA~|~Resurface with 2" asphalt concrete the Bloody Bridge parking lot at SR 66 and CR 182. 118669~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11. 113721~|~1~|~1~|~01/SAF~|~Install a NB right turn lane on SR-741 at Remick Blvd, install new signal with backplates and retime the signal. 95715~|~1~|~1~|~01/NFP~|~Replacement of drainage system along the West side of State Route 46 from slm 16.09 to slm 16.32, Austintown Township, Mahoning County, Ohio. 110683~|~1~|~1~|~01/NFP~|~All work included in this split using district preservation allocations. 104578~|~1~|~1~|~01/ENH/ROSE~|~Village of Roseville Transportation Alternative (Enhancement) Funds - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of concrete sidewalks and curbs along North Main Street; 1st Street; 2nd Street; 3rd Street; Chaney Street and Zanesville Road in the Village of Roseville 93817~|~1~|~1~|~01/STR~|~Resurfacing of Cleveland Massillon Road (CR-17) in Bath Township from Ghent Road to Ira Road. SLM 17.32 to SLM 19.83. Includes shoulder improvements, partial and full depth repairs, catch basin repairs, guardrail upgrade. 87691~|~1~|~1~|~01/STR~|~Bridge Repair: CRA-19-6.13 (SFN 1700464), CRA-19-6.22 (SFN 1700472), MED-252-2.73 (SFN 5206804) 87691~|~1~|~2~|~02/NHS~|~Bridge Repair: WAY-30-21.26 (SFN 8502285) 94723~|~1~|~2~|~02/SAF~|~100% Safety funding for ramp capacity and arterial improvements. 94723~|~1~|~1~|~01/IMS~|~90/10 Federal/State funding split for all work replacing existing ramp pavement 101850~|~1~|~1~|~01/S<2~|~1) rebuild deck edges 2) remove existing (2005) 1" - 1 1/2" asphalt wearing surface 3) remove exisitng (1982) 1 1/4" latex modified concrete wearing surface 4) place new SDC overlay using hydrodemolition 5) reface abtument walls with anodes while catching deck floor spalling at abutments 6) encase pier columns 7) patch pier caps 8) rebuild wingwalls 9) design expansion joint system (possible Poly-Mod). 92115~|~1~|~1~|~01/IMS~|~resurface LUC IR 475 9.92-14.53 - I-475/US-23 split to Douglas Rd 82796~|~1~|~1~|~01/CMQ~|~80/20 fed/local funding split using federal CMAQ funds. 82796~|~1~|~2~|~02/NFP~|~100% Local participation for work that is not eligible for federal funds. 113751~|~1~|~1~|~01/SAF~|~For pavement markings on the Interstate system in Allen and Hancock counties. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal. 113751~|~1~|~2~|~02/SAF~|~For pavement markings on the NHS on US 68 in Hancock County and US 23 in Wyandot County. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal. 96793~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Gallia County. CEAO funded. Funded 100% federal. 98217~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% federal funds. 99008~|~1~|~1~|~01/STR~|~Raise and stabilize the north approach slab of DAR-185-8.20 (SFN 1902903) over the Stillwater River. 100627~|~1~|~1~|~01/S>2~|~plan split for pavement work in the large urban sections:CLE-132: SLM 10.80-16.19 100627~|~1~|~2~|~02/STR~|~plan split for pavement work in the rural section:CLE-132: SLM 17.32-18.73 100627~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 94410~|~1~|~1~|~01/S<2~|~From SLM 7.07 to SLM 12.32. It was decided not to chanrge the local the 20% match. 94410~|~1~|~2~|~02/BRO~|~Approach slab of the Mamascus bridge. 111366~|~1~|~2~|~02/S>2~|~Split 2 for urban paving work 111366~|~1~|~1~|~01/MPO~|~Split for intersection improvement/pedestrian safety work. 111366~|~1~|~3~|~03/NFP~|~Plan split for non-eligible items. 121875~|~1~|~1~|~01/STR~|~slide repair near Fernald Hill on BUT SR 126 - rural section near SLM 9.5 124748~|~1~|~1~|~01/SAF~|~Paint Creek Recreational Trail Rehab. 112726~|~1~|~1~|~01/S>2~|~Replace culvert at DEL-42-12.97 96554~|~1~|~3~|~03/S>2/CANF~|~Widening portion of US-62 from Dartmouth (SLM 9.13) to Sleepy Hollow Drive (SLM 9.25), in the City of Canfield, Mahoning County, Ohio. 96554~|~1~|~1~|~01/S>2/CANF~|~Resurfacing of US 62 from SLM 9.13 to SLM 9.67. In the City of Canfield, Mahoning County, Ohio. 96554~|~1~|~2~|~02/MPO/CANF~|~Major Rehabilitation, including new curb and drainage along US62 from Darmouth (SLM 9.13) to SLM 9.67, in the City of Canfield, Mahoning County, Ohio. 97300~|~1~|~1~|~01/NFP~|~Plan split for all work on the interstate system 94243~|~1~|~1~|~01/NFA/HAS~|~"01/NFA/PV/HAS" - Jobs and Commerce funding eligible for any project work 111099~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Replacement of the Superstructure on SFN 4506723 98478~|~1~|~1~|~01/STR~|~MED-83-0.94-12.77 Micro 98478~|~1~|~2~|~02/STR~|~Bridge work not determined. 105145~|~1~|~1~|~01/NHS~|~Resurfacing. 105145~|~1~|~2~|~02/NHS~|~Reconstruction, adding northbound left turn lane on US 62 at Franklin Ave and adding a U-turn area for trucks at Hibler Lane includes culvert replacements and drainage work. 105145~|~1~|~3~|~03/IMS~|~Full depth repairs and drainage work. 123298~|~1~|~1~|~01/SAF/JEF~|~Guardrail upgrades utilizing CEAO HSIP (4HB7) funding at 100%. 118059~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funded scope to construct roundabout, resurface road, and add MUP. Section of Non-Federal road is associated with roundabout on Federal-eligible road. 96758~|~1~|~1~|~01/NFP~|~One year (FY 2015) contract for mowing of interstates and interstate look-a-likes in POR, STA and SUM Counties. 100329~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code 99618~|~1~|~2~|~02/STR~|~See linked culverts. 99618~|~1~|~3~|~03/STR~|~New 10' structure replacing culvert at SLM 11.86. 99618~|~1~|~1~|~01/S<2~|~Minor bridge work to structure >20' span. 115328~|~1~|~1~|~01/NFA~|~Bridge replacement project on NOB CR 47 3.49 (SFN 6130593). Work includes intersection reconstruction and drainage improvement. 112492~|~1~|~1~|~01/STR~|~AC overlay with repairs 104681~|~1~|~1~|~01/NFP~|~ADA VAR CR PM 87701~|~1~|~1~|~01/NHS~|~District Allocation 107270~|~1~|~1~|~01/NFP~|~All work is included in this split. 107963~|~1~|~1~|~01/ENH~|~Relocation of POR Hike and Bike Trail onto railroad bridge. 102524~|~1~|~1~|~01/STR~|~Chip Seal on:PRE-732BUT-177 95523~|~1~|~1~|~01/S<2~|~Paint bridge superstructure and seal concrete surfaces with epoxy urethane. Bridge # CLA-235-0395, SFN 1205765. 113548~|~1~|~1~|~01/IMS~|~Split for bridge painting on the interstate 121292~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing. 112182~|~1~|~1~|~01/NHS~|~Minor bridge rehab > 20' span. 110938~|~1~|~1~|~01/S>2~|~Split for resurfacing work 84625~|~1~|~2~|~02/IMS~|~Minor bridge work >20' span. 84625~|~1~|~3~|~03/NHS~|~Minor bridge work >20' span. 84625~|~1~|~1~|~01/NHS~|~Resurfacing. 84625~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span and culvert. 84625~|~1~|~5~|~05/S5K~|~Ashtabula lift bridge, replacing existing rivets with new bolts at vertical connections on panel points. 84625~|~1~|~6~|~06/NHS~|~Catch basin reconstruction/replacements and culvert clean out on SR 11 between I-90 and SR 531. 86044~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1805460; CUY-071-1829 124629~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to install and upgrade guardrail on various county roads. 75890~|~1~|~4~|~04/STR~|~Rehab several bridge size culverts on HAM-128 including scour protection. R/W is possible. Remove abandoned structure at HAM-128-0296. This Plan Split is for the Rural portion of the bridge work. The bridges included in the Rural portion are:HAM SR128 0060; SFN: 3104206 and intersects: Trib Great Miami RiverHAM SR128 0217; SFN: 3104230 and intersects: Trib Great Miami RiverHAM SR128 0296; SFN: 3104265 and intersects: Trib Great Miami RiverHAM SR128 0423; SFN: 3104354 and intersects: Trib Great Miami RiverHAM SR128 0638; SFN: 3104478 and intersects: Trib Great Miami RiverHAM SR128 0888; SFN: 3104508 and intersects: Trib Great Miami River 75890~|~1~|~6~|~06/S>2~|~Funding split for costst associated with bridges HAM-128-0423 and HAM-128-0683. 75890~|~1~|~5~|~05/STR~|~This plan split includes Village of Cleves Waterworks' watermain relocation near the Village of Cleves. 75890~|~1~|~2~|~02/STR~|~Plane and pave portion of SR 128 in Hamilton County from the intersection with US 50 to the I-74 interchange. This Plan Split is for the Access Management Issues is also included in this Plan Split. 75890~|~1~|~8~|~08/S>2~|~Funding split for all costs associated with bridge HAM-128-0296. 75890~|~1~|~3~|~03/STR~|~Plans split for repair of slides including items related to the construction of the retaining walls, embankment reconstruction, roadway base reconstruction, and barrier replacement. This plan split uses Geologic Site Management (GSM) funds which are capped at $300,000 and District Preservation funds (4ps7/4pf7) which will fund the balance of the slide repair work. 75890~|~1~|~1~|~01/STR~|~Plane and pave portion of SR 128 in Hamilton County from the intersection with US 50 to the I-74 interchange. This Plan Split is for the Rural portion of the pavement from SLM 0 to 4.93. The Plan Split also includes the guardrail upgrade to MGS. 75890~|~1~|~7~|~07/STR~|~Funding split for all costs assotiated with bridge HAM-128-0217. 124515~|~1~|~1~|~01/STR~|~stp rural 122137~|~1~|~1~|~01/BRF~|~Bridge (2930331) to be replaced along CR 69 over Ceasar Creek 112583~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing of Ravenna Rd from E Idlewood Dr to Chamberlin Rd in the City of Twinsburg. 88679~|~1~|~1~|~01/IMS~|~plan split for all roadway work 88679~|~1~|~2~|~02/IMS~|~plan split for all work associated with bridges 89277~|~1~|~1~|~01/S>2~|~80/20 state/local split for all Urban Paving eligible work. 89277~|~1~|~2~|~02/S>2~|~100% local participation items of work such as curb ramps, etc. 115665~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 143 0.21-0.778. 115665~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 681 7.24-10.49, MEG 681 0.00-4.78, 17.50-21.17. 92069~|~1~|~2~|~02/NHS~|~Split for work on drainage structures under interstate freeway look-a-likes that do not meet federal bridge definition. 92069~|~1~|~1~|~01/IMS~|~Split for drainage structure repair under the interstate that do not meet federal bridge definition. 93805~|~1~|~1~|~01/MPO~|~Resurfacing of Fairchild Avenue (CR-140) from Majors Lane to Hudson Road. 118186~|~1~|~1~|~01/SAF~|~Plan split for roundabout construction 112485~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 104257~|~1~|~1~|~01/NFA~|~MOWING 100989~|~1~|~1~|~01/STR~|~DSR# BEL-012 96828~|~1~|~2~|~02/NFA~|~Non Transportation Alternative Program construction costs. Village of Tuscarawas responsibility with OPWC, ARC, local funds. 96828~|~1~|~1~|~01/ENH~|~Eligible Transportation Alternative Program construction costs 80% 4B37 (TAP) and 20% LNTP (Local). 109117~|~1~|~1~|~01/SAF~|~Work to improve the pedestrian safety around the Brooklyn Elementary School that is eligible for federal-aid 119251~|~1~|~1~|~01/S>2~|~Columbus Urban Area Plan Split 119251~|~1~|~2~|~02/STR~|~All work associated with SR 37, SR 203, SR 521, and SR 656. 107370~|~1~|~1~|~01/NFP~|~Restriping along various routes within D5. 90248~|~1~|~1~|~01/ENH~|~Enhancement funding to rehab historic Strend Rd structure over Big Darby CreekSFN 8031401 UNI-CR67-0.77 Big Darby 95140~|~1~|~1~|~01/NFA~|~Install new and upgrade existing guardrail on various locations in Auglaize County. Auglaize County Guardrail Project on non-federal air routes. CEAO funding at 100%. 95529~|~1~|~1~|~01/STR~|~SR772 SLM 13.41 to SLM 23.88 Resurfacing ProjectBegin at SR124 to Ross Co line it is proposed to resurface the highway and perform any needed repairs. 80/20 split 95529~|~1~|~2~|~02/S<2~|~SR335 SLM 24.78 to SLM 26.06 Resurfacing ProjectOn SR335 in Waverly Corp it is proposed to resurface the highway and perform any needed repairs. 80/20 split 102982~|~1~|~1~|~01/NHS~|~This plan split is for the NHS routes. 112408~|~1~|~1~|~01/NHS~|~AC overlay with repairs on: CLE-125 SLM 5.13 to 5.33 CLE-125 SLM 5.33 to 6.92 CLE-125 SLM 6.92 to 7.11 CLE-125 SLM 7.11 to 7.37 CLE-125 SLM 7.37 to 8.95 112408~|~1~|~2~|~02/NHS~|~Culvert work 112408~|~1~|~3~|~03/NHS~|~Rehabilitate the CLE-125-0594 structure as follows: 1. Tuck point the masonry and patch the concrete in the intermediate junction chambers. I believe there are 3 of them. 2019 inspection photos: J:\structures\bridges\19 photos\CLE\SR125\0594 2. Replace the guardrail on the north (outlet) end that complies with current standards. 112408~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 110733~|~1~|~1~|~01/NFP~|~Construction inspection. 118911~|~1~|~1~|~01/NFP~|~Guardrail replacement and maintenance 123656~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. 100421~|~1~|~1~|~01/SAF~|~Intersection, Safety Project 100421~|~1~|~2~|~02/NHS/HUR~|~Urban Paving slm 17.49 to 19.34. 100421~|~1~|~3~|~03/NHS/HUR~|~100% City of Huron Items. 100421~|~1~|~4~|~04/BRO/HUR~|~Bridge Work for Urban Paving 17.49 to 19.34 80% fed / 20% state. 80969~|~1~|~1~|~01/ERD~|~Federal earmark funding for all work. 105832~|~1~|~1~|~01/STR~|~Slide Repair 104921~|~1~|~1~|~01/IMS~|~Bridge Split 104921~|~1~|~2~|~02/IMS~|~Plans split for roadway barrier sealing 94786~|~1~|~1~|~01/S<2~|~Field pave invert of existing CMP structure. Structure is only 17 feet in length. SFN 0601020 AUG 66 1076 over unnamed ditch. 94786~|~1~|~2~|~02/STR~|~Field pave invert of existing CMP structure on SFN 0601292 AUG 66 2129 over Miami & Erie Canal. 114291~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8. 114291~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. 83661~|~1~|~2~|~02/ENH~|~Rehabilitate existing covered bridge. Vertical and diagonal members, floor system and roof will be replaced. Install improved lighting and surveillance system. SFN 1359975 83661~|~1~|~1~|~01/ERD~|~Rehabilitate existing covered bridge. Vertical and diagonal members, floor system and roof will be replaced. Install improved lighting and surveillance system. SFN 1359975 116337~|~1~|~1~|~01/S>2~|~Resurfacing on WAR-22 for the large urban sections 116337~|~1~|~2~|~02/STR~|~Resurfacing on the Rural sections of WAR-22 116337~|~1~|~3~|~03/S>2~|~TSMO work to widen US-22. 116337~|~1~|~4~|~04/S>2~|~Culvert rehabilitation work not tied to widening/extending culverts for TSMO portion of scope. 98856~|~1~|~1~|~01/NHS~|~Replace RoW fence in various locations. 100934~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete SR 117 and a portion of SR 245 in Logan County: LOG SR 117 SLM 5.83 to 6.85 LOG SR 245 SLM 1.76 to 2.11 100934~|~1~|~2~|~02/NFA~|~Overlay with asphalt concrete a portion of SR 245 in Logan County: LOG SR 245 SLM 0.87 to 1.76 113796~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" - replacement of MUS TR 274 0.10 (SFN 6037674) structure. 107181~|~1~|~1~|~01/SAF~|~Pavement Marking project on various County Roads using 100% 4HB7 CEAO Safety funds. 116494~|~1~|~1~|~01/S>2~|~Culvert replacement 116494~|~1~|~2~|~02/STR~|~Culvert replacement & resurfacing 87164~|~1~|~1~|~01/STR~|~Split includes Rehabilitation of bridge bridges PRE-177-0667 over Four Mile Creek and bridges PRE-177-0922 over Fleisch Run and all associated approach roadway work. 96346~|~1~|~1~|~01/SAF~|~Realigning and reconfiguring the intersections of US-62, Middlebranch, Harrisburg, and 30th Street in Plain Township, Stark County, Ohio. Project includes the construction of a roundabout at Harrisburg and 30th Street. 96346~|~1~|~2~|~02/SAF/CANT~|~Reconstruction of City of Canton waterline along US-62. 124508~|~1~|~1~|~01/NHS~|~Roadway 121008~|~1~|~1~|~01/S5K~|~Realignment and reconstruction work in the City of Kenton. 121008~|~1~|~2~|~02/S5K~|~Resurfacing work on US 68 and SR 31. 124554~|~1~|~1~|~01/BRO~|~Bridge replacement. 124554~|~1~|~2~|~02/NHS~|~Conduit replacement 100528~|~1~|~1~|~01/STR~|~Microsurfacing of HAS-9 from SLM 10.63 to 13.24 119236~|~1~|~1~|~01/STR~|~Rural plan split. 121677~|~1~|~1~|~01/S>2~|~Ped/bike trail 120352~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU Counties. 110077~|~1~|~1~|~01/IMS~|~All work in this plan split using district preservation allocations. 115532~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 111616~|~1~|~1~|~01/NHS~|~Overhead bridge approach pavement repairs/resurfacing 103932~|~1~|~1~|~01/ENH~|~Construction of sidewalk near Harding Elementary in the City of Youngstown, Mahoning County, Ohio. 89461~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to build a roundabout at LUC CR8 8.38-9.39/LUC CR71 5.35-5.36 122178~|~1~|~1~|~01/NFA~|~NEVI Round 2B MUS 70/77-A 84523~|~1~|~5~|~05/STR~|~Resurfacing - Non Federal Aid System - 100% 4PS7 (State) HUR-103-05.69 - 07.39 84523~|~1~|~4~|~04/STR~|~Bridge Rehab - Pier EncasementsHUR-103-01.60 84523~|~1~|~3~|~03/STR~|~Resurfacing Fed/State 80/20 4PF7/4PS7 84523~|~1~|~2~|~02/STR~|~100% City of Willard 84523~|~1~|~1~|~01/STR~|~Rural paving - 80/20 - District Allocation/City of Willard 101984~|~1~|~1~|~01/NFP~|~Spot pavement repairs on various routes throughout Portage, Stark, and Summit Counties. 89501~|~1~|~1~|~01/S<2~|~"01/S<2/PV/HEAT" Resurfacing of Hopewell Drive within the City of Heath between SR13 and SR79. 1.5" of pavement to be planned and replaced with 1.5" of 448 asphalt. Existing railroad crossing will be removed and replaced with asphalt. Pavement will be restriped with Thermo Plastc Markings and RPM's - LCATS Cap of $232,000 98977~|~1~|~1~|~01/MPO~|~Resurfacing Riddle Ave from Liberty St to New Milford Rd in the City of Ravenna. 108642~|~1~|~1~|~01/NHS~|~Pedestrian improvements along Cleveland Ave 89247~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Mus-SR 666-01.78 to 2.75 89247~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Mus-SR 666-02.75 to 14.17 89247~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG6(20% Local OPWC) - CAP $21,246.33 OPWC Funds - Urban Paving in City of Zanesville on OFAH-Urban portion of Mus-SR 666-00.00 to 00.57; 89247~|~2~|~5~|~05/NFA~|~"05/NFA/CV/ " - District Preservation 4PS7(100% State) - No CAP - Culvert Replacement on Mus-SR 666-13.61 89247~|~1~|~4~|~04/NFA/ZANE~|~"04/NFA/PV/ZANE" - District Preservation 4PS7(80% State) / 4BG6(20% Local OPWC) - CAP $42,492.66 OPWC Funds - Urban Paving in City of Zanesville on NOFAS-Urban portion of Mus-SR 666-00.57 to 01.78; 124454~|~1~|~1~|~01/STR~|~Construct crosswalks 108797~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 5.95-5.99. 80% Federal ER and 20% State ER funds. MOE-003, OH2018-01. 108503~|~1~|~1~|~01/NFP~|~All work in the project to replace the bridge. 124007~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 108660~|~1~|~1~|~01/MPO~|~roadway diet work eligible for federal-aid 119125~|~1~|~1~|~01/S>2~|~Resurfacing. 83060~|~1~|~1~|~01/STR~|~PIK SR772 2.04 - 9.11 ResurfaceingOn SR 772, beginning at the Scioto County line and heading north east and terminate the project at SR32, it is proposed to resurface the highway with asphalt concrete.Brdgs 6603157 PIK SR772 7.90 Intersect: Bull Run6603181 PIK SR772 8.16 Intersect: Bull Run6603211 PIK SR772 8.62 Intersect: Bull Run6603246 PIK SR772 8.76 Intersect: Bull Run6603211 PIK SR772 8.62 Intersect: Bull Run 6603246 PIK SR772 8.76 Intersect: Bull Run 80/20 split 117512~|~1~|~1~|~01/BRO~|~Bridge rehabilitation work eligible for CEAO LBR funding. 117512~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 102378~|~1~|~1~|~01/NFP~|~All costs for this facility project. 111074~|~1~|~1~|~01/IMS~|~GSM funded plan split 100927~|~1~|~1~|~01/NHS~|~Safety Itmes 124990~|~1~|~1~|~01/MPO~|~MPO CRP funds 83083~|~1~|~3~|~03/NFA~|~Chip & SealROS -SR -372 SLM 0.000 to SLM 0.680 1.360 LMSCI -SR -371 SLM 0.000 to SLM 0.400 0.800 LM 100%% state 83083~|~1~|~2~|~02/S<2~|~Chip & SealSCI -SR -239 SLM 0.760 to SLM 1.220 0.920 LM80% fed/20% State 83083~|~1~|~1~|~01/STR~|~Chip & SealROS -SR -41 SLM 3.970 to SLM 14.920 21.900 LMSCI -SR -239 SLM 0.000 to SLM 0.760 1.520 LMHIG -SR -41 SLM 0.000 to SLM 7.360 14.720 LM BRO -SR -125 SLM 11.860 to SLM 15.380 7.040 LM80% fed/20% state 98888~|~1~|~1~|~01/IMS~|~MIA IR 75 0.00-4.83 - MOT IR 75 23.56 - 24.42 Repair/Replace deteriorated sections of the median barrier wall and rebuild median inlets at specified locations. 98490~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 121322~|~1~|~1~|~01/NHS~|~added NHS plan split. 102110~|~1~|~1~|~01/NFA~|~FY16 construction inspection 102110~|~1~|~2~|~02/NFA~|~FY17 construction inspection 105946~|~1~|~1~|~01/S>2~|~Construct electric vehicle charging stations and vehicle purchases 101000~|~1~|~1~|~01/STR~|~This plan split is for the rural routes 101000~|~1~|~2~|~02/S<2~|~This plan split is for the small urban route. 100346~|~1~|~1~|~01/STR~|~All work in project. Federal and state funds from the District Preservation Program budget. SAC 4PF7 and 4PS7. No local funds. 103822~|~1~|~1~|~01/NHS~|~Bridge repair on NHS bridges. 92500~|~1~|~1~|~01/STR~|~Guardrail 103493~|~1~|~1~|~01/ENH~|~Construction of an 8' wide sidepath on the north side of Indian Ripple Road from Harbert Drive to Grange Hall Road, and a 5' wide sidewalk on the south side of Indian Ripple Road from east of Marydale Drive to Grange Hall Road. Addition of curb and gutter and storm sewer on both sides of Indian Ripple within the project limits. 110362~|~1~|~1~|~01/SAF~|~CEAO Safety funds plan split 85692~|~1~|~1~|~01/BRF~|~Bridge replacement on Prospect Street in the Village of New London 105457~|~1~|~1~|~01/NHS~|~AC Overlay without Repairs 115182~|~1~|~1~|~01/IMS~|~Construction of Type II Noise Barrier along IR-480. 112582~|~1~|~1~|~01/NHS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work. 106404~|~1~|~1~|~01/SAF~|~Install sidewalk on the west side of US-27 from Banning to Brynside; painted crosswalks at Brynside intersection and ADA curb ramps; unsignalized crosswalk north of Banning with concrete median island and RRFB or PHB 106404~|~1~|~2~|~02/SAF~|~Water work to be paid by GCWW 105241~|~1~|~1~|~01/NHS~|~Resurfacing. 105241~|~1~|~2~|~02/NHS/GREE~|~Resurfacing, urban paving in the City of Green. 105241~|~1~|~3~|~03/NHS/GREE~|~100% city items including resurfacing of side roads at Steese Rd Roundabout, full and partial depth repairs and ADA curb ramps. 108105~|~1~|~1~|~01/MPO~|~Mill and resurfacing on the roadway in the City of Moraine. 116394~|~1~|~1~|~01/NHS~|~Crack Sealing 100851~|~1~|~1~|~01/NHS~|~ROS 23 9.38-10.9735 0.00-4.48 97248~|~1~|~1~|~01/IMS~|~MSC OL of FRA-270-36.94 L, SFN 2511800, over Big Walnut Creek 90250~|~1~|~1~|~01/NFA~|~Plan Splits. 100% Fed CEAO 115056~|~1~|~1~|~01/BRO~|~Replace bridge carrying State Route 799 over McFadden Run/Clendening Lake. 114977~|~1~|~1~|~01/STR~|~All work is in this plan split from district allocations using SACs 4PF7 (80%) and 4PS7 (20%). 85108~|~1~|~3~|~03/NHS~|~Resurfacing project on COL-45 from 15.34 to 16.43 near Lisbon, Ohio. 85108~|~1~|~1~|~01/STR~|~Resurfacing project on COL-45 from 16.43 to 16.92 and on COL-164 from 9.78 to 14.26 near Lisbon, Ohio. 85108~|~1~|~2~|~02/S<2~|~Resurfacing project on COL-164 from 14.26 to 14.87 and from 15.22 to 15.60 near Lisbon, Ohio. 85108~|~1~|~4~|~04/NFA~|~SR 164 from SLM 15.60 to 15.67. 105186~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 84406~|~1~|~1~|~01/NFP~|~80/20 funding split for work that is eligible for urban paving funding 84406~|~1~|~2~|~02/NFP~|~100% local funding for the following: 1) work items not eligible for State funds and 2) cost above the State capped funding. 92738~|~1~|~1~|~01/NFA/Mill~|~Plan Split for the resurfacing of Robinson Hill Drive, from Old Furnace Road to West Glacier Drive, in Mahoning County, Ohio. 95109~|~1~|~1~|~01/CMQ~|~80% federal / 20% local pariticipation using MPO CMAQ funds for the upgrade/replacement of the signals along SR-17, SR-252, and Butternut Ridge Road in the City of North Olmsted. 95109~|~1~|~2~|~02/NFP~|~Split 2 for 100% local work beyond the original project scope 82981~|~1~|~1~|~01/BRF~|~ Rehabilitate existing structure to legal load limit; repair abutments as needed, replace deck, paint structure, apply scour protection and railing repair on Seven Mile Road-0.72 mile east of SR 127 SFN 6831826 sponsor Preble County 98739~|~1~|~1~|~01/NHS~|~?01/NHS/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS routes in Fairfield, Guernsey, Muskingum & Perry Counties. 98739~|~1~|~2~|~02/S<2~|~?02/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes in Fairfield, Guernsey, Muskingum & Perry Counties. 98739~|~1~|~3~|~03/STR~|~?03/STR/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routesin Fairfield, Guernsey, Muskingum & Perry Counties. 98739~|~1~|~4~|~04/NFA~|~?04/NFA/OT/ ? - District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes in Fairfield, Guernsey, Muskingum & Perry Counties. 102267~|~1~|~1~|~01/STR~|~ER Slide Repair 102267~|~1~|~2~|~02/STR~|~Split for change order. 80729~|~1~|~1~|~01/CMQ~|~CMAQ funding to be used for construction of the new structure. 80729~|~1~|~2~|~02/NFP~|~100% local participation on work items not-eligible for federal funds. 91518~|~1~|~1~|~01/BRO~|~Replace superstructure (BR eligible for rehab & replacement)SFN 2508583, FRA-104-5.63, Over I-270 90931~|~1~|~1~|~01/STR~|~District Allocation 101988~|~1~|~1~|~01/NFP~|~Mowing 122053~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 92357~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment. install retaining wall to mitigate landslide. 124970~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on interstate system 97352~|~1~|~1~|~01/NFP~|~Split 1 105501~|~1~|~1~|~01/IMS~|~All interstate 105501~|~1~|~2~|~02/IMS~|~Created CO CO Engr 01 plan split for all interstate routes 110844~|~1~|~1~|~01/SAF~|~Provide sidewalks, curb, curb ramps, retaining walls and BMPs along 17th St and Ann St 92828~|~1~|~1~|~01/NFP~|~All work for this project. 100% state funds. SAC 4MA7 funds provided by ODOT District One. 95924~|~1~|~1~|~01/S>2~|~Repaving to include minor base repairs and traffic signage upgrade CR 25A from Donn Davis Way to Commerce Park Drive. Kessler Cowlesville Road from western Tipp City Corp to Rosewood Creek Subdivision. 92582~|~1~|~2~|~02/S<2~|~This is for the slide 92582~|~1~|~1~|~01/SAE~|~OTT SR53 4.9-5.37 108312~|~1~|~3~|~03/STR~|~MGS Guardrail Upgrade along rural routes. 108312~|~1~|~2~|~02/S5K~|~MGS Guardrail Upgrade along STP Routes 108312~|~1~|~1~|~01/NHS~|~Guardrail repairs on State Routes along NHS routes 91153~|~1~|~1~|~01/NFP~|~Maintenance contact for SFY 2015 herbicidal spraying. 100% State. 108765~|~1~|~1~|~01/S>2~|~Bridge rehab on local bridge in the City of Miamisburg. 121454~|~1~|~1~|~01/NHS/KENT~|~Resurfacing. 102851~|~1~|~2~|~02/STR~|~ROS 104 25.45 (SFN 7103905) 102851~|~1~|~1~|~01/NHS~|~ROS 35 13.40 (SFN 7101678)ROS 35 18.12 (SFN 7101813) 105660~|~1~|~1~|~01/S<2~|~Mill and fill on small urban route: SR 198 SLM 1.63 to 2.22 85231~|~1~|~1~|~01/STR~|~Replace Bridge SFN 0405477 ATB 193 1137 over Mill Creek 118966~|~1~|~1~|~01/SAF~|~Plan split for reflective/wet reflective pavement markers. 94677~|~1~|~2~|~02/IMS~|~Replace structures. 94677~|~1~|~1~|~01/IMS~|~Replace deck 103102~|~1~|~1~|~01/STR~|~Plan Split 01 created for routes requiring RPM Pavement Markings in FY22 102883~|~1~|~1~|~01/STR~|~STP rural for slm 8.91 to 11.46 102883~|~1~|~2~|~02/S>2~|~LUC-64 from SLM 2.10 to 2.15 and SLM 2.67 to 6.369 111266~|~1~|~1~|~01/NFA~|~Barkcamp Park Beach Parking Lot resurfacing 120662~|~1~|~1~|~01/STR~|~Culvert rehab and replacement. 108566~|~1~|~1~|~01/NHS~|~Rehabilitate existing utility bridge that carries utility lines above US 30. Rehabilitation to include: replacing the deck (utility maintenance platform), replace the rocker bearings with elastomeric bearings, repair broken pipe hangers and supports, repair section loss on main girders and constructing fence to eliminate vandal access to deck. Structure will be painted with OZEU painting system. 94567~|~1~|~1~|~01/NFP~|~Lighting repair and maintenance on various routes in Portage, Stark, Summit counties, Ohio. 108104~|~1~|~1~|~01/STR~|~Split for resurfacing rural STP route 97283~|~1~|~1~|~01/STR~|~Disrtict wide herbicidal spray project. 97549~|~1~|~2~|~02/BRF~|~Ohio Bridge Partnership Program. SFN 5233232, West Smith Road 97549~|~1~|~1~|~01/BRF~|~Ohio Bridge Partnership Program. SFN 5233860, Branch Road 98554~|~1~|~1~|~01/NHS~|~Concrete pavement repair on US 30. Funding is 80% federal and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7. 98554~|~1~|~2~|~02/S<2~|~Concrete pavement repair on SR 12, SR 613 and CR 99 in Hancock County. Funding is 80% federal and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7. 106990~|~1~|~1~|~01/S<2~|~GSMP slide repair. 96703~|~1~|~1~|~01/NFA~|~TRU Brookfield Outpost, expand garage by 2 bays (approx 40'x42') to store 2 more trucks and tie into sanitary sewer. 114555~|~1~|~1~|~01/IMS~|~Resurfacing 109271~|~1~|~1~|~01/NHS~|~Replacement of SFN 4501632 (LIC-37-9.645) 110140~|~1~|~1~|~01/STR~|~Asphalt Concrete Resurfacing. Fed / State funding within and outside of Dalton. 96689~|~1~|~1~|~01/NFP~|~Unfunded mowing contract 97389~|~1~|~1~|~01/BRO~|~Split for all bridge work using BR funds at 80/20. 96781~|~1~|~1~|~01/IMS~|~Pavement Marking 120380~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 96719~|~1~|~1~|~01/NFP~|~Mowing 116692~|~1~|~1~|~01/NHS~|~NHS Plan Split 116692~|~1~|~2~|~02/NFA~|~Not on Federal Aid System Plan Split 116692~|~1~|~3~|~03/S5K~|~STP 5,000 - 49,999 Plan Split 116692~|~1~|~4~|~04/STR~|~STP Rural Plan Split 107768~|~1~|~1~|~01/NFP~|~All maintenance related bridge work. All work to be included in this split except for collision repair damage to McClain Road Bridge (SFN 0201723). 107768~|~1~|~2~|~02/IMS~|~All collision repair work to SFN 0201723. No maintenance related work to be included in this split. 122442~|~1~|~1~|~01/NHS~|~Construct RCUT on US 23 at the SB rest area 87125~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2019 105710~|~1~|~1~|~01/MPO~|~MORPC funds for bike share, 26 stations/232 bikes. 105710~|~1~|~2~|~02/MPO~|~100% Local Items 81746~|~1~|~3~|~03/ENH~|~Sidewalk 03/ENH/OT/ 81746~|~1~|~4~|~04/NHS/WOR~|~100% Worthington paid items - lighting, fence lettering (alternate items for signs and signals)04/NHS/OT/WOR 81746~|~1~|~7~|~07/NHS/AEP~|~100% AEP items at Campus View & Flint 81746~|~1~|~6~|~06/NHS~|~Brdige replacement & widening:SFN 2500752, FRA-23-22.91, over I-27006/NHS/BR/EX 81746~|~1~|~9~|~09/NHS/FIBE~|~100% items for Columbus Fibernet at Campus View 81746~|~1~|~8~|~08/NHS/AT&T~|~100% items for AT&T at Campus View & Flint 81746~|~2~|~10~|~10/NHS~|~Adding lane with sidewalk & bikepath, Flint to Lazelle 81746~|~1~|~1~|~01/NHS~|~FRA-23 roadway work, SLM 22.85-24.65, area N. of I-270 bridgeIncludes retaining walls, 270 CD lanes, ramps, York Temple Dr01/NS/PV/ 81746~|~1~|~5~|~05/NHS~|~New Bridges:SFN 2500760, FRA-23-23.30, under Campus View BlvdSFN 2500779, FRA-23-23.63, under Flint Rd05/NHS/BR/NEW 81746~|~1~|~2~|~02/S>2~|~FRA-23 roadway work, SLM 22.23-22.85, area S. of I-270 bridge02/S>2/PV/ 91558~|~1~|~1~|~01/IMS~|~Bridge painting project. Various locations in D10. 93416~|~1~|~1~|~01/IMS~|~resurface LUC IR 475 0.00-8.98 - Wood County Line/Maumee River to Central Ave overhead 116396~|~1~|~1~|~01/STR~|~Guardrail replacement 119901~|~1~|~1~|~01/STR~|~Project to address flooding location by improving drainage and realigning vertical roadway profile at VIN 93 7.20-7.40. Funded 80% Protect/20% state. 113633~|~1~|~1~|~01/SAF~|~Split 1 for pavement grooving and optics on the interstate routes 113633~|~1~|~2~|~02/SAF~|~Split 2 for pavement grooving and optics on SR-2 121861~|~1~|~1~|~01/S5K/ZANE~|~Streetscape, pedestrian facilities and related work along Fourth St from Market St to South St in the City of Zanesville. (TAP Safety 80% 4B37/20% 4HJ7) 97772~|~1~|~1~|~01/NFP~|~Construct new Pickaway County Garage 121434~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. 109682~|~1~|~1~|~01/STR~|~Resurfacing SR 164 114234~|~1~|~1~|~01/S<2~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 113959~|~1~|~1~|~01/MPO~|~Resurfacing eligible items. 102109~|~1~|~1~|~01/SAF~|~Intersection Improvement - Median Closure - 90/10 Fed/State 102109~|~1~|~2~|~02/SAF~|~Traffic Signal Construction at US30 and SR94 using 100% 4HJ7 safety funds. 113342~|~1~|~1~|~01/NFP~|~All work is in this split using 100% state funds from the District 1 preservation program. 121244~|~1~|~1~|~01/SAF~|~District wide pavement markings 95273~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 147 16.38-16.43. Emergency B project. Funded 100% state. 7467~|~1~|~1~|~01/MPO~|~Major widening 92559~|~1~|~1~|~01/ENH~|~Construct ped overpass in Marysville over US-33 and multi-use path on south side of US-33 117432~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 110049~|~1~|~1~|~01/NHS~|~resurfacing on the NHS portion of CLE-125 110049~|~1~|~2~|~02/SAF~|~Centerline rumble stripes. 110049~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 102269~|~1~|~1~|~01/NFP~|~SFN 3501345 116502~|~1~|~1~|~01/STR~|~Plan split for rural. 116502~|~2~|~2~|~02/S5K~|~Added plan split. 98819~|~1~|~1~|~01/IMS~|~Split for interstate mowing 119844~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 102212~|~1~|~1~|~01/S<2~|~LAW CR 31 0.40 ER Slide Repair. 115672~|~1~|~1~|~01/SAF/CIN~|~Improvements to the intersection of Harrison and Montclair Avenues including construction of curb bump-outs, installation of new ADA compliant curb ramps, and construction of a pre-cast concrete raised crosswalk across Harrison Avenue. 85398~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 104070~|~1~|~1~|~01/BRF~|~Bridge replacement on TR 34 (Gore Orphanage Road). 121374~|~1~|~1~|~01/NFP~|~FY29 Bridge Holder 111089~|~1~|~1~|~01/NHS~|~Debris removal. 97326~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD. 104795~|~1~|~1~|~01/BRO~|~"01/BRO/BR/NEWA" - City of Newark bridge replacement utilizing LCATS funding (structure file #4560388) 93981~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn CR60, 2.05 miles from its junction with SR28, at SLM 4.10, it is proposed to replace the structure (SFN 7133588). 96020~|~1~|~1~|~01/IMS~|~Mowing contract for the East Central Region of Ohio. 122495~|~1~|~1~|~01/STR~|~Roadway rehabilitation and associated improvements utilizing State Oil & Shale funds at 100% up to Program maximum. 118611~|~1~|~1~|~01/NHS~|~Mine outfall repair. 119072~|~1~|~1~|~01/MPO~|~Road diet along Reading Road from Cornell to Sharon. Improvements to pedestrian facilities, signals, street lighting. 119072~|~1~|~2~|~02/MPO/SHAR~|~Landscaping and other items not eligible for federal funding. 100% locally funded. 119849~|~1~|~1~|~01/BRO~|~Replace SFN 2560283 111539~|~1~|~1~|~01/NHS~|~1 3/4" mill and fill with superpave asphalt on: MOT-741 SLM 8.38 to 9.54 in the City of Moraine 101710~|~1~|~1~|~01/NFA~|~Multi-use trail construction from the current end of the Hockhocking Adena Trail to the intersection of CR 24A and US 50. Not on any federal aid system funded 95 federal/5 local. 87746~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 87746~|~1~|~2~|~02/NHS~|~Bridge work to be determined. 87746~|~1~|~3~|~03/S<2~|~60-AC Overlay w/Rpr WAY SR 172 0.000 to 0.570 87746~|~1~|~4~|~04/NFA~|~60-AC Overlay w/ Repair WAY-TR80347-0.00 to 0.144 119243~|~1~|~1~|~01/IMS~|~Interstate Plan Split 99437~|~1~|~2~|~02/NHS~|~Replace small culvert CLER-125-1736 99437~|~1~|~1~|~01/S>2~|~Replace small culverts CLE-131-0455 and CLE-132-0547 109882~|~1~|~1~|~01/STR~|~2025 Operations Chip Seals 95692~|~1~|~1~|~01/NHS~|~Addition of 10' asphalt shared use path on the north side of US 20 from County Line Road to SR 60. 95692~|~1~|~2~|~02/NHS~|~100% local for removal of encroachments. 123789~|~1~|~1~|~01/STR~|~STP 95379~|~1~|~1~|~01/NFP~|~spot pavement repair locations 118964~|~1~|~1~|~01/S5K~|~Small City (4B97) funding for reconstruction of SR61 (West Main St) 123916~|~1~|~1~|~01/STR~|~Slope stabilization along on SR 146 in Muskingum County. 91938~|~1~|~1~|~01/STR~|~D09 Guardrail 122209~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-E 98820~|~1~|~1~|~01/IMS~|~Split for interstate work 110729~|~1~|~1~|~01/STR~|~Resurfacing of US 68 outside of the Kenton and Findlay Urban Areas. All work on US 68 in Hardin County between the Kenton Urban Area limits at TR 114 at 11.06 and the Hancock County line at 21.80 and all the work on US 68 in Hancock County from the Hardin County line at 0.00 to the ramps to the SR 15/US 68 4-lane expressway at 11.67. District Preservation Program funds. 110729~|~1~|~2~|~02/S<2~|~Resurfacing on US 68 inside the Kenton and Findlay Urban Areas. All works is outside of the cities and Kenton and Findlay. Work on US 68 in Hardin County from the beginning of the project at 10.54 until the Kenton Urban Area limits at TR 114 at 11.06 and work on US 68 in Hancock County from the ramps to the SR 15/US 68 4-lane expressway at 11.67 until the end of the project at 12.13. District Presentation Program funds. No local funds. 87541~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6004865 MUS SR146 20.92 Intersect: Boggs Crk #; Not BR Eligible for Replacement: Length=49 SD/FO(1) SR=63.8 DSR=7; 2) 6005101 MUS SR146 27.39 Intersect: Brancj Buffalo Fork #; Not BR Eligible for Replacement: Length=22 SD/FO(0) SR=81.3 DSR=6 87541~|~1~|~2~|~02/SAF~|~"02/SAF/PV/ " - HRRR Safety Funding 4RS7(90% Federal) / 4BC7(10% State) - CAP of $716,310.00 - Realignment of TR 389 and SR 146 to improve sight distance and reduce accidents 101175~|~1~|~1~|~01/NHS~|~Double micro on NHS Routes: LOG US 33 SLM 15.66 to 17.80 & 17.80 to 21.52. 101175~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings. 96342~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge replacement on 6400159 PER-SR 13-05.74 Intersect: Over Tributary of Sunday Creek; Not BR Eligible: Length=15, SD/FO(0) SR=61.8 DSR=5 22984~|~1~|~1~|~01/NFA~|~New bridge over the Maumee River near City of Napoleon. 22984~|~1~|~3~|~03/NFP~|~Plan split for Telephone conduit on bridge 22984~|~1~|~2~|~02/NFP~|~Plan Split for City of Napoleon Waterline Work to be paid by Henry county 97647~|~1~|~1~|~01/STR~|~Resurfacing COL 172 from Stark Co. Line to SLM 8.96, including asphalt overlay, pavement repairs and pavement markings. 113775~|~1~|~1~|~01/SAF~|~Provide sidewalks for Grace St. 94166~|~1~|~1~|~01/BRO~|~Replace existing einforced concrete deck on bridge COL-14-0197 (SFN 1503308) with new composite reinforced concrete deck 119425~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with Repairs CRA-61, CRA-181, RIC-181 119425~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs RIC-181-0.013 to 2.40 119425~|~1~|~3~|~03/S50~|~Asphalt Concrete Overlay with Repairs RIC-181-2.40 to 2.688 114390~|~1~|~1~|~01/IMS~|~sock lining and hard lining 42? concrete pipe located I71 ramp and Stewart Road 105189~|~1~|~1~|~01/STR~|~All work in this project. All funds are from the District Preservation Program budget. There are no local funds. 117223~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 821 8.69. GSM funded. 106542~|~1~|~1~|~01/NFP~|~Repair and resurfacing of roads and camping pads within Mt Gilead State Park 123232~|~1~|~1~|~01/IMS~|~Resurfacing. 123232~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance to multiple bridges. 106995~|~1~|~1~|~01/NHS~|~GSMP slide repair. 93500~|~1~|~5~|~05/NHS~|~test 93500~|~1~|~7~|~07/BRO~|~test 93500~|~1~|~6~|~06/BRO~|~test 93500~|~1~|~4~|~04/BRO~|~test 93500~|~1~|~1~|~01/ENH~|~Test PID 93500~|~1~|~2~|~02/BRF/123~|~test 93500~|~1~|~8~|~08/ENH~|~test 93500~|~1~|~3~|~03/BRO~|~wr4 wr 92992~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Cos-SR 751-00.00 to 04.01 92992~|~1~|~2~|~02/NFA~|~District Preservation - 4PS7 (100% State) - No CAP - Resurfacing on Cos-SR 751-04.01 to 11.42; 101447~|~1~|~3~|~03/S<2~|~Federal 80%/State 20% Pavement outside City limits:RIC US42 12.46 to 12.72 (RT)RIC US42 12.80 to 12.90 (RT) 101447~|~1~|~1~|~01/S<2~|~Federal 80%/Local 20% (Mansfield) Urbanized Area Inside Corp. Limit (Paving Items):RIC US42 11.67 to 13.13 (LT)RIC US42 11.67 to 12.46 (RT)RIC US42 12.72 to 12.80 (RT)RIC US42 12.90 to 13.13 (RT) 101447~|~1~|~2~|~02/S<2~|~100% Local (Mansfield): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): RIC US42 11.67 to 13.13 (LT)RIC US42 11.67 to 12.46 (RT)RIC US42 12.72 to 12.80 (RT)RIC US42 12.90 to 13.13 (RT) 101447~|~1~|~4~|~04/S<2~|~RIC-US42-11.960 SFN: 7002882 (ROCKY FORK CREEK)Preventive Maintenance: Treatment Type (48): Expansion joint repair/replacementMinor Rehabilitation: Treatment Type (60) Sidewalk repair/replace, (119) Approach (other) 109124~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 62.80. 89467~|~1~|~1~|~01/ENH~|~Construction of 0.68 miles of bike trail along the Little Stillwater Creek. A truss bridge over the creek. An additional 0.39 miles of trail will be signed on existing streets. Project within Dennison and Uhrichsville. 102508~|~1~|~1~|~01/NFP~|~Landscaping. 114953~|~1~|~1~|~01/NHS~|~Culver lining. 114953~|~1~|~2~|~02/STR~|~Culvert lining. 114953~|~1~|~3~|~03/IMS~|~Culvert lining. 121430~|~1~|~1~|~01/STR~|~Plan split for WOO-64 121430~|~1~|~2~|~02/SAF~|~Plan split for roundabout construction at SR-64 & Bishop Rd. Intersection 83968~|~1~|~1~|~01/BRO~|~Replacement of SFN 7803397 and 7803427 over RR at SLM 1.91 L&R 83968~|~1~|~2~|~02/IMS~|~Total pavement replacement of TRU-IR80 from SLM 1.68 to SLM 2.18, in Weathersfield Township, Trumbull County, Ohio. 102567~|~1~|~1~|~01/NFA~|~TR 35 0.06 Pierce Road (SFN0830000) 80135~|~1~|~1~|~01/IMS~|~Plan split to program project, update after scope is complete. 116883~|~1~|~1~|~01/S5K~|~Resurfacing project in SCI. 102996~|~1~|~1~|~01/STR~|~Bridge deck replacement project. WAS 555 1930 (SFN 8404682). STP funds, 80% Federal and 20% State. 89053~|~1~|~1~|~01/NHS~|~From Bridge No. HAM-71-0181, the Pedestrian overpass over I-71/I-471 to Bridge No. HAM-71-0226, Elsinore Pl Overpass This is Construction Contract (CC) OH-1 of the Brent Spence Bridge Project. The purpose of this project is to make temporary maintenance of traffic provisions for the routing of I-71 traffic onto I-471. The project will provide for two lane connections between I-71 and I-471. The temporary condition will be restored under CC OH-1A. 105508~|~1~|~1~|~01/STR~|~Created CO CO Contr 01 plan split 80/20 105508~|~1~|~2~|~02/STR~|~Created CO CO Engr 01 112664~|~1~|~1~|~01/NHS~|~Repairs on UNI-33-2.71, FRA-104-12.48 112664~|~1~|~2~|~02/IMS~|~Repair beam damage due to an accident at Weber Rd over IR 71 (SFN 2508079) 98574~|~1~|~1~|~01/S>2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): LOR SR 83 SLM 10.500 TO 15.160 98574~|~1~|~2~|~02/S>2~|~100% Local (North Ridgeville): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): LOR SR 0083 SLM 10.500 to 15.160 98574~|~1~|~3~|~03/NHS~|~Bridge Work: (Patching top of BackWalls)LOR 0083 - 10.75 SFN 4708431 114492~|~1~|~1~|~01/NFP~|~FY 26 Overlay 93036~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) Cos-SR 93-03.52 to 11.94; 2) Cos-SR 93D-00.00 to 00.28; 93036~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 93360~|~1~|~1~|~01/IMS~|~Construct noise wall on I-270 from Livingston to Noe-Bixby 107826~|~1~|~1~|~01/STR~|~Rural Plan Split 107826~|~1~|~2~|~02/S>2~|~Urban Area (>200,000) plan split 102673~|~1~|~1~|~01/S>2~|~Pavement reconstruction and adding TWLTL between 34th Street and Southgate Shopping Center in Canton Township, Stark County, Ohio. 100654~|~1~|~1~|~01/STR~|~Spot paving various locations throughout District 11. 93759~|~1~|~1~|~01/ENH~|~Construction of multi-purpose trail on various routes in the City of Kent. 122594~|~1~|~1~|~01/ERD~|~Repair up to 8 areas of roadway pavement distress impacted by slope instability. 110956~|~1~|~1~|~01/SAF~|~Construction of new sidewalk, addition of ADA compliant curb ramps, and solar powered crosswalk signs on Willow Street from 5th Street to 6th Street. Removal and replacement of existing sidewalk on the south side of Spring Street from 5th Street to Broadway Street. 93473~|~1~|~1~|~01/SAF~|~HEN-6 guardrail upgrade from SLM 5.4 107407~|~1~|~1~|~01/BRO~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - BR Eligible - Rehabilitation of SFN 4505115 carrying SR 79 over Rocky Fork 109358~|~1~|~1~|~01/S>2~|~Demolition of buildings along new US 62 alignment. 94768~|~1~|~1~|~01/CMQ~|~Widen Middle Urbana Road to accomodate center left turn lan on Middle Urbana Road from Villa to SR 334. 94768~|~1~|~2~|~02/NFA~|~Water and sanitary work 101328~|~1~|~1~|~01/NFP~|~Bridge replacement. 118851~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 2.55 to SLM 12.12 118851~|~1~|~2~|~02/S5K~|~Resurfacing SR 9 from SLM 12.12 to SR 45 97879~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Anticipated TRAC Funding - No CAP - construction of interchange at SR 161 and Mink Street Road. 101105~|~1~|~1~|~01/STR~|~AC Overlay without repair 101105~|~1~|~2~|~02/S<2~|~AC Overlay without repairs 98054~|~1~|~1~|~01/NFA~|~ODNR Bridge Repair 93174~|~1~|~1~|~01/MPO~|~Resurfacing with 1 1/2" of Item 448 asphalt on CR 25A from the Troy Corporation Limit to the Piqua Corporation Limit with enhanced pavement markings. 93174~|~1~|~2~|~02/S<2~|~Resurfacing on CR 25A SLM 12.402 to 13.349 work non-performed from PID 87534 paid with District Allocation. 124747~|~1~|~1~|~01/BRF~|~Bridge replacement 109640~|~1~|~1~|~01/SAF~|~Safety plan split 82933~|~1~|~2~|~02/BRO~|~SFN# 5000874, bridge over Indian Run...BR eligible... 82933~|~1~|~1~|~01/STR~|~SFN# 5000963 over branch of the Little Beaver... 94155~|~1~|~1~|~01/IMS~|~Extrusheet replacement on interstate locations 106986~|~1~|~1~|~01/NFA~|~The Mason - Montgomery Road widening project will create an additional lane on northbound Mason - Montgomery Rd from Parkway Drive to Socialville-Fosters Road. 101555~|~1~|~1~|~01/S<2~|~Resurfacing project using an asphalt overlay treatment. HOC CR 33A 3.97-5.17. Work also includes storm water utility improvements. Funded 95 federal/5 local. 107727~|~1~|~2~|~02/S<2~|~Culvert work on RIC SR 0039 11.147. 107727~|~1~|~1~|~01/STR~|~Culvert work on HUR SR 0061 11.97 92619~|~2~|~2~|~02/MPO~|~Plan Split added for 100% City items. 92619~|~1~|~1~|~01/MPO~|~Mill & Fill 109837~|~1~|~1~|~01/STR~|~HIG 247 0.00-11.13 109837~|~1~|~3~|~03/S<2~|~HIG 138 15.06-15.35 (Hillsboro)80/20 local match 109837~|~1~|~4~|~04/STR~|~Bridge preventative maintenance. 109837~|~1~|~2~|~02/S<2~|~HIG 247 11.13-11.74 109837~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 100752~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. GAL 553 0.00-2.34. Rural other federal aid funded 80 federal/20 state. 122206~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-B 92586~|~1~|~1~|~01/STR~|~At the inersection of SR124 & CR39 (Mulga Road), this project is for the preparation of the Army Corps of Engineers 404/401 individual permit and the purchase of RW for mitigation purposes. Using Task Order 92152. 88220~|~1~|~1~|~01/S>2~|~Resurface the existing roadway from Tipp City North Corporation Limit to Troy's South Corporation Limit. on CR 25A 4.38 to 5.83. 83382~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Realigning roadway to mitigate mutliple landslides. 114735~|~1~|~1~|~01/NHS~|~FY25 Overlay. 108548~|~1~|~1~|~01/S>2~|~2" mill and fill in the City of New Carlisle - UPP. 105070~|~1~|~1~|~01/NFA~|~The County will widen Johnson Road to accommodate a North Bound Left Turn Lane and a South Bound Right Turn lane into Honda's Gate R entrance. In addition, widen SR 739 to accommodate a North Bound Left Turn lane into Honda's R&D entrance. 88834~|~1~|~1~|~01/IMS~|~This split is for paving work on the interstate system. Funds are from the District Preservation Program. 90875~|~1~|~1~|~01/STR/BALT~|~"01/STR/OT/BALT" - Village of Baltimore SRTS project - installation of new sidewalks, curb ramps and flashing lights along SR158 within the Village. SRTS CO funding cap of $351,386.00 102512~|~1~|~1~|~01/NFA~|~The CIC is constructing 650 feet of new two-lane road to be called Southwestern Blvd 100461~|~1~|~1~|~01/STR~|~HIG 73 0.00-7.08 100461~|~1~|~2~|~02/S<2~|~HIG 73 7.08-7.41 96345~|~2~|~2~|~02/MPO~|~100% local items 96345~|~1~|~1~|~01/MPO~|~eligible STP intems thru the MPO 98717~|~1~|~1~|~01/BRO~|~Bridge replacement MED-CR 99-0.80 (Shaw Rd). 103344~|~1~|~1~|~01/S>2~|~Resurfacing of Riley Boulevard from South Main Street to Second Street. 92743~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 21.17-21.23. 80% Federal and 20% State. 97624~|~1~|~1~|~01/NHS~|~Resurfacing on BEL-7 from 2.26 to 6.02, including asphalt overlay, pavement repairs and pavement markings. 97624~|~1~|~2~|~02/STR~|~Resurfacing BEL-149 from SR 331 to HAS Co. line including asphalt overlay, asphalt repairs and pavement markings. 121427~|~1~|~2~|~02/STR~|~Guardrail STP Rural 121427~|~1~|~3~|~03/NFA~|~Guardrail - Not on Federal Aid 121427~|~1~|~1~|~01/S5K~|~Guardrail replacement STP Rural 5,000 - 49,999 113361~|~1~|~1~|~01/IMS~|~Widen and reconstruct various locations. 113361~|~1~|~2~|~02/IMS~|~Replace, remove and widen bridges. 113361~|~1~|~3~|~03/S>2~|~This plan split covers all non-interstate roadwork in the project 113361~|~1~|~4~|~04/IMS~|~This plan split addresses the additional superstructure width that is being provided on the Ezzard Charles bridge over I-75 (aka bridge caps). The substructure will be paid under the structure plan split. 109689~|~1~|~1~|~01/STR~|~Install and upgrade existing guardrail on various county roads 22220~|~1~|~1~|~01/NHS~|~Plan split for all pavement items. 116297~|~1~|~1~|~01/STR~|~Microsurfacing project. 124631~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to install and upgrade current pavement markings on various county roads. 107964~|~1~|~1~|~01/IMS~|~Crack seal and minor pavement repairs on: CLA IR 70 SLM 0.51 to 10.00 88514~|~1~|~1~|~01/STR~|~Resurface SEN SR18 30.5-34.73 92381~|~1~|~1~|~01/SAE~|~100% Safety on various routes in columbus Area. 88728~|~1~|~4~|~04/NHS~|~80/20 4PF7/4PS7 Fed/State - Non urban paving pavementRIC-039-13.15 - 13.16 Rt 88728~|~1~|~5~|~05/S<2/MSFD~|~100% City of Mansfield Items 88728~|~1~|~2~|~02/NHS/MSFD~|~80/20 4PF7/4BG7 Fed/City NHS segments within the city of Mansfield RIC-013-14.41 - 15.14RIC-039-13.15 - 13.16 Lt / 13.16 - 13.82 / 15.17 - 15.37RIC-042-11.38 - 11.66 88728~|~1~|~6~|~06/S<2~|~80/20 4PF7/4PS7 Fed/State - Bridge Work 88728~|~1~|~1~|~01/S<2/MSFD~|~80/20 4PF7/4BG7 Fed/City - Non-NHS Urban PavingRIC-039-13.82 - 15.17 / 15.37 - 16.80RIC-545-00.00 - 01.14 / 01.14 - 01.19 RtRIC-430-02.19 - 05.41 / 05.69 - 05.70 88728~|~1~|~3~|~03/S<2~|~80/20 4PF7/4PS7 Fed/State Non NHS Non UrbanRIC-039-16.70 - 16.80 RtRIC-545-01.14 - 01.19 Lt / 01.19 - 01.44 100606~|~1~|~1~|~01/S<2~|~Resurfacing TUS-39 from SLM 15.77 to TR 314, including pavement repairs and pavement markings. 100606~|~1~|~2~|~02/STR~|~Resurfacing TUS-39 from TR 314 to Roswell 116772~|~1~|~1~|~01/NHS~|~Resurfacing. 100415~|~1~|~1~|~01/NFP~|~Township is adding an auxiliary lane on Galbraith Rd with right turn to US-22/3 and intersection improvments at North Creek Dr. 104803~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings 107498~|~1~|~1~|~01/STR~|~Resurfacing COL-164 87714~|~1~|~1~|~01/IMS~|~District Allocation 90/10 87714~|~1~|~2~|~02/IMS~|~District Allocation 90/10 87714~|~1~|~3~|~03/IMS~|~Rest Area Work - 100% 4BR7 87714~|~1~|~4~|~04/IMS~|~Storm Water Mitigation Items 83085~|~1~|~1~|~01/STR~|~HIG 50 (0.00-7.42)HIG 134 (12.28-13.99) 92422~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds SAC 4PS7. 116707~|~1~|~1~|~01/S5K~|~Resurfacing. 116707~|~1~|~2~|~02/STR~|~Resurfacing. 85137~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 123 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 85137~|~1~|~2~|~02/STR/BLAN~|~OPWC funded items inside the Village of Blanchester. Including curbs, gutters, sidewalks, and catch basins. 102653~|~1~|~1~|~01/NFP~|~TRU Canoe City MetroPark parking lot resurfacing. 109752~|~1~|~1~|~01/STR~|~01/STR/PV : Plan Split 1 100575~|~1~|~2~|~02/S<2~|~ROS 41 14.23-14.92 100575~|~1~|~1~|~01/STR~|~ROS 41 3.69-14.23 100575~|~1~|~3~|~03/STR~|~Bridge PM 100575~|~1~|~4~|~04/S<2~|~Bridge PM 110194~|~1~|~1~|~01/S>2~|~Urban paving - 2" mill and fill with asphalt concrete on: MOT-201 SLM 2.18 to 3.88 110194~|~1~|~2~|~02/NHS~|~Urban Paving - 2" mill and fill with asphalt concrete on: MOT-202 SLM 3.60 to 3.72 in the City of Dayton 110194~|~1~|~3~|~03/NHS~|~Urban Paving - 2" mill and fill with asphalt concrete on: MOT-202 SLM 2.06 to 3.60 MOT-202 SLM 3.72 to 4.35 Urban Paving - 1 3/4" mill and fill with superpave asphalt MOT-835 SLM 0.18 to 0.62. City of Riverside 110194~|~1~|~4~|~04/S>2~|~Replace traffic island on SR 835 (change order) 101283~|~1~|~1~|~01/STR~|~All work associated with resurfacing on SR-49 101535~|~1~|~1~|~01/MPO~|~Repair and resurface East 55th Street 116676~|~1~|~1~|~01/STR~|~This split is for the portion of SR 292 that is outside the Kenton Urban area. 120083~|~1~|~1~|~01/SAE~|~Roundabout construction on SR 46 at New Rd. 120083~|~2~|~2~|~02/S>2~|~Resurfacing. 110511~|~1~|~1~|~01/SAF~|~Intersection improvement project. MRG 60 11.72-11.78 and MRG 78 18.90. Safety funded 90 federal/10 state. 105024~|~1~|~1~|~01/CMQ~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 22.38-24.91, WAS 26 0.00-0.62, WAS CR 50 1.06-1.79, WAS CR 350 0.00-0.62, WAS CR 2001 0.00-0.08, 0.36-0.51, and WAS CR 2004 0.00-0.33. Funded 80 federal CMAQ/20 local. 105024~|~1~|~2~|~02/NHS~|~Extra signal controller paid for by City of Marietta. 100% City funds. 114284~|~1~|~2~|~02/IMS~|~Plan Split for mowing in MOT Co 114284~|~1~|~1~|~01/IMS~|~Mowing contract in D8 99881~|~1~|~1~|~01/NFA~|~Summit County Engineer. 104718~|~1~|~1~|~01/NHS~|~Reconfiguring IR 480/SR 91 to a diverging diamond interchange (DDI). 94461~|~1~|~1~|~01/STR~|~District Wide Raised Pavement Markings 102349~|~1~|~1~|~01/STR~|~microsurfacing 94063~|~1~|~1~|~01/NHS~|~Preventive Maintenance Resurfacing 98931~|~1~|~1~|~01/IMS~|~District Wide Raised Pavement Markers 105083~|~1~|~1~|~01/NFP~|~This is the district's long line pavement marking maintenance project. 91757~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment on MEG 33 4.26-10.02. NHS route funded 80 federal/20 state. 91757~|~1~|~3~|~03/NFP~|~Resurfacing of the Meigs 10-31 & 10-32 rest areas. Funded 100% state. 91757~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment on MEG 124 20.66-22.08, MEG 833 4.61-4.70 and an asphalt overlay treatment on MEG 124 22.08-22.36. Urban other federal aid funded 80 federal/20 state. 106251~|~1~|~1~|~01/NFA~|~The City will reconstruct as well as widen in areas along 1200 feet of Chamberlain Blvd as well as widen the intersection of Chamberlain Blvd and Parrish Rd. 121344~|~1~|~1~|~01/NFP~|~Created for ODOT TID Funding 96791~|~1~|~1~|~01/IMS~|~Emergency Type A mill and fill reactive MIA IR 75 2.60 116187~|~1~|~1~|~01/STR~|~Bridge replacement 97282~|~1~|~1~|~01/NHS~|~Split for erosion work 97311~|~1~|~1~|~01/IMS~|~Plan split for guardrail upgrade work 97311~|~1~|~2~|~02/NFP~|~Guardrail repair work at 100% state 114992~|~1~|~1~|~01/IMS~|~Plan Split for the work included in the project 114992~|~1~|~2~|~02/SAF~|~Plan Split for the Safety funded portion of the R-WR striping: the groove and enhanced optic. 80970~|~1~|~1~|~01/ERD~|~Earmark at federal participation rate of 100% using TRC. 94060~|~1~|~1~|~01/NFP~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2013-2014 used for Construction Inspection services. 117515~|~1~|~1~|~01/SAF~|~Safety - traffic signal 77646~|~1~|~1~|~01/STR~|~Rural other federal aid culvert replacement project. WAS 7 3979, SFN 8400431. Replace existing 120" CMSPP with box culvert. 104880~|~1~|~1~|~01/STR~|~BRO SR 774 10.50 (SFN 0804290) 124317~|~1~|~1~|~01/NFA~|~Construct parking lot 91351~|~1~|~1~|~01/SAE~|~Revise the alignment of the eastbound left turn lane at Dorset/Archer, and rebuild and upgrade the traffic signal. Install dilemma zone protection, ADA ramps and pedestiran count-down signals at the I-75 interchange. 108245~|~1~|~1~|~01/CMQ~|~complete street work eligible for federal-aid 108245~|~1~|~2~|~02/NFP~|~Split for unfunded construction costs. 124892~|~1~|~1~|~01/NHS~|~Culvert liner. MOE 7 14.35, CFN: 5600480. 103070~|~1~|~1~|~01/NHS~|~Block 120375~|~1~|~1~|~01/IMS~|~Rockfall hazards mitigated by cutting back the slope on WAS 77 17.13-17.34 RT. Includes WAS 77 17.15-17.28 LT. 101299~|~1~|~1~|~01/NHS~|~NHS 105228~|~1~|~1~|~01/S<2~|~Resurfacing US 30 from Lisbon to SLM 19.74 105228~|~1~|~2~|~02/STR~|~Resurfacing US 30 from SLM 19.74 to SR 11 105228~|~1~|~3~|~03/BRO~|~Plan split for bridge COL-30-18.947 105228~|~1~|~4~|~04/BRO~|~Plan split for work on bridge COL-30-24.488 95313~|~1~|~1~|~01/NHS~|~Install a left turn lane for NB MEG 7 5.00-5.80 traffic. Relocate MEG 143 0.00-0.12 intersection south to avoid bridge widening and to improve sight distance. NHS route funded 90 federal/10 state safety funds and 80 federal/20 state preservation funds. 95313~|~1~|~2~|~02/STR~|~Install a left turn lane for NB MEG 7 5.00-5.80 traffic. Relocate MEG 143 0.00-0.12 intersection south to avoid bridge widening and to improve sight distance. Rural route funded 80 federal/20 state preservation funds. 105650~|~1~|~1~|~01/SAF~|~plan split 102332~|~1~|~1~|~01/NHS~|~Replace decks on four structures 102332~|~1~|~2~|~02/SAF~|~Install recessed wet reflective pavement markings 88942~|~1~|~1~|~01/BRO~|~The project calls for a complete replacement of the existing boxbeam bridge with a new single-span box beam bridge. The existing bridge (BEL-9-1048, SFN 0700967) carries SR 9 over McMahons Run. 88942~|~1~|~2~|~02/BRO~|~On going services by Consultant for the bridge during Construction 96252~|~1~|~1~|~01/S<2/COL~|~Resurface 1.95 miles of CR 430 (Calcutta Smith Ferry Rd) from CR 435 (Parkway Ave.) at SLM 3.30 to the bottom of the 3 lane section (SLM 5.25). 80/20 Fed/Local. 96252~|~1~|~2~|~02/S<2~|~Resurface 1.95 miles of CR 430 (Calcutta Smith Ferry Rd) from CR 435 (Parkway Ave.) at SLM 3.30 to the bottom of the 3 lane section (SLM 5.25). 100% local portion above fed max. 114098~|~1~|~1~|~01/STR~|~Slope repair along STA SR 800 from 1.88 to 1.90 and 1.93 to 1.95. 105069~|~1~|~1~|~01/NHS~|~Resurfacing SR 5 from 14.39 to 18.25. 105069~|~1~|~2~|~02/STR~|~Microsurfacing of TRU SR 5 from 30.95 to 32.51; TRU SR 5D from 0.00 to 0.07; TRU SR 88 from 7.03 to 13.95. 105753~|~1~|~1~|~01/STR~|~Reconstruction of section to include widening and curb, gutter and enhancements in the Village of Covington. 105753~|~1~|~2~|~02/STR~|~Items funded 100% local traffic control items 105753~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 109873~|~1~|~1~|~01/NFP~|~FY2025 District wide raised pavement markers. 115148~|~1~|~1~|~01/S<2~|~GSM plan split to repair revetment along SR 163 shoreline 108266~|~1~|~1~|~01/MPO~|~Resurface and narrow existing roadway (road diet) to install wider sidewalks and bike facilities. Installation of decorative elements (street trees, street lighting, and planters. 108266~|~1~|~2~|~02/NFP/FAIR~|~Plan split for 100% locally funded work including utility (waterline) improvements, an alternate for including fibers in the pavement, and an alternate for decorative lighting. 109409~|~1~|~1~|~01/SAF~|~ District wide fast drying pavement markers. 109714~|~1~|~1~|~01/S>2~|~AC overlay without repairs 109714~|~1~|~2~|~02/STR~|~Resurfacing 109714~|~1~|~3~|~03/S>2~|~UPP - Tipp City resurfacing 109714~|~1~|~4~|~04/S>2~|~Paving west leg of SR571 in West Milton 90207~|~1~|~1~|~01/ENH/MTVE~|~"01/ENH/OT/MTVE" - Local Enhancement Project - 4B37 (80% Federal) / 4BG7 (20% Local) - CAP $440,000.00 federal funding - City of Mount Vernone Bridge project installing a new pedestrian & bike path bridge in Foundation Lake Park utilizing an historical superstructure. 108161~|~1~|~1~|~01/S>2~|~Milling and resurfacing including base repairs, loop detectors and thermoplastic striping. 106372~|~1~|~1~|~01/IMS~|~Bridge deck sealing/deck patching on IR bridges. 124988~|~1~|~1~|~01/ENH~|~MPO CRP funds 124412~|~1~|~1~|~01/SAF~|~All roundabout work included in this split. 121473~|~1~|~1~|~01/IMS~|~Embankment failure on HAM-75 near Hopple 97905~|~1~|~1~|~01/CMQ~|~CR 249 (OM 038) - This project provides a two way bike path. In addition a bike path will be constructed on top of the levy for the Great Miami River. This path will connect to the bike lane at one end and to a proposed ramp to Wolf Creek and Great Miami River trails being constructed by Five Rivers Metro Parks as part of the River Run project. 93099~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 93099~|~1~|~2~|~02/STR~|~Bridge Repairs WAY-301-02.84 sfn:8505020 123712~|~1~|~1~|~01/IMS~|~Plan split to paint bridges on the interstate system. 94459~|~1~|~1~|~01/BRF/GCEO~|~"01/BRF/BR/GCEO" - CEAO Fed/State Exchange 4C87(80% State) / LNTP(20% Local) - CAP $579,680.00 @ 80% - Replacement of 3032914 BR Eligible for Replacement: Length=65 SD/FO(0) SR=53.9 DSR=6 91393~|~1~|~1~|~01/NHS~|~Priority system resurfacing 99467~|~1~|~1~|~01/NHS~|~The project involves the removal and relocation of the existing railroad spur servicing Ametek Plastic, Inc. from its crossing of US-33 located just east of Cemetary Road to the north side of US-33 within the road right of way and on a similar alignment to US-33. Roadway items will also be part of this project including, repair of the existing US-33 pavement, installation of guardrail on the north side of US-33, pavement markings, drainage, utility relocation, etc. 108793~|~1~|~1~|~01/NHS~|~Urban paving split 108793~|~1~|~2~|~02/NHS~|~100% City Items 117785~|~1~|~1~|~01/ENH~|~Shared Use Path utilizing Federal TAP funds at 95% (with TRC) and Federal HIP funds at 80% up to respective funding caps. 95234~|~1~|~1~|~01/SAF~|~100% SRTS funding up to funding cap for crosswalks, sharrows, flashing school zone signs, and bicycle racks 108265~|~1~|~1~|~01/MPO~|~Mill and resurfacing of Dayton-Oxford/Chautauqua Road from Fairview Drive to Cedar Lane. 89163~|~1~|~1~|~01/NFA~|~Safe Routes to School infrastructure project. Work includes construction of sidewalks and other pedestrian facility improvements. 84517~|~1~|~1~|~01/IMS~|~District wide bridge sealing project. Includes the following structures: HAM-42-1613, HAM-275-2238L, HAM-275-2238R, HAM-275-2338L, HAM-275-2338R, HAM-275-2438L, HAM-275-2438R, HAM-275-2454L, HAM-275-2454R, HAM-275-2541, HAM-275-2572, HAM-275-2594L, HAM-275-2594R, HAM-275-2612L, HAM-275-2612R, HAM-275-2620L, HAM-275-2620R, HAM-275-2645L, HAM-275-2645R, HAM-275-2722L, HAM-275-2722R, HAM-275-2733L, HAM-275-2733R, HAM-275-2749L, HAM-275-2749R, HAM-275-0618, BUT-75-0660W, BUT-75-0376, and HAM-75-1159L. 84517~|~1~|~2~|~02/STR~|~District wide bridge sealing project and includes the following structures: CLI-132-0084 and CLI-68-0882. 103833~|~1~|~1~|~01/MPO~|~Resurfacing of Center Road in the City of New Franklin 124362~|~1~|~1~|~01/SAF~|~Road diet & sidewalk on GAL 588 0.00-0.85. Work includes reducing the number of lanes from 4 to 3. Existing sidewalks to be widened and new sidewalks added. Safety funded 90 Federal/10 State. 95928~|~1~|~1~|~01/STR~|~Remove existing non-composite asphalt wearing surface and overlay with micro silica modified concrete. Place expansion joint gland system at approach, patch box beams and joints. Bridge # CHP-36-0804, SFN 1100718. 113124~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment. 95576~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement ASD-302-02.48/ASD-071-13.68 115378~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4. 101744~|~1~|~1~|~01/BRF/LCEO~|~CEAO LBR program 4B87 (80% Federal) / LNTP (20% Local [15% CB and 5% LNTP] - See CAP Comments - Replacement of deficient bridge ((4533364) on McKean Twp Rd 118 90580~|~1~|~1~|~01/CMQ~|~4 traffic signals on SR619 in the Village of Hartville, Stark County, Ohio. 123252~|~1~|~1~|~01/S5K~|~Lighting Replacement 97165~|~1~|~1~|~01/S>2~|~Bridge replacement on CR 11 Home Avenue over Little Cuyahoga River by the Summit County Engineer. 97165~|~1~|~2~|~02/S>2~|~100% City of Akron items. 97165~|~1~|~3~|~03/S>2~|~100% AT&T Fiber Relocation. 120948~|~1~|~1~|~01/S5K~|~Small City Funding 85087~|~1~|~1~|~01/STR~|~01/STR/PV/ Resurfacing using rural STP funds. Work outside the Kenton Urban Area. All work on US 68 and SR 81. Funds from the District Preservation Program budget. No local funds. 85087~|~1~|~4~|~04/S<2/KENT~|~04/S<2/OT/KENT/ Items paid 100% by the City of Kenton. For pavement repair costs and specialized pavement markings requested by the City of Kenton for routes within the city limits. 85087~|~1~|~3~|~03/S<2~|~03/S<2/PV/ Work outside the City of Kenton but inside the Kenton Urban Area. All funds from the District Preservation Program budget. No local funds. SR 31 on the right side from SR 292 at 10.16 to 10.37. SR 67 from 17.31 on the right. SR 309 on the left from Washington Blvd to 16.72 and 16.75 to 16.85. SR 309 on the right from 16.75 to the end of the project at CR 171 at 16.93. 85087~|~1~|~2~|~02/S<2~|~02/S<2/PV/ Work inside the City of Kenton. Federal funds from the District Preservation Program budget. The 20% match is provided by the City of Kenton. All of SR 31 on the left side. SR 31 on the right side starting at 10.37. SR 67 from the corporation limits at 15.07 to 17.31 on the right side and 17.53 on the left side. SR 309 on the left side from 16.72 to 16.75 and 16.85 to CR 171 at 16.93. SR 309 on the right side from 16.71 to 16.75. 96079~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " Plan Split for the construction of a loader/equipment storage building to be constructed at the site of the old Gue-70-03.47 EB weigh station 104408~|~1~|~1~|~01/SAF~|~All work associated with separating the I-75 southbound ramps to I-275 104408~|~1~|~2~|~02/SAF~|~Plan split for ODOT Labr for scope development 119012~|~1~|~1~|~01/BRF~|~Superstructure replacement on bridge. 117083~|~1~|~1~|~01/NFA~|~Access road in Ripley, Ohio. 100488~|~1~|~1~|~01/NHS~|~ROS 35 (15.22-20.48 & 22.75-25.02) 100488~|~1~|~2~|~02/NHS~|~Bridge work 7101686 ROS 35 15.517101651 ROS 35 15.517102011 ROS 35 19.217102194 ROS 35 20.417102259 ROS 35 24.207102291 ROS 35 24.21 95120~|~1~|~1~|~01/CMQ~|~Relocation of the existing Western Row Road and Columbia Road intersection 820 feet to the east. 95120~|~1~|~2~|~02/S>2~|~Plan split to cover Greater Cincinnati Waterworks relocation that is not eligible for project reimbursement. 104263~|~1~|~1~|~01/STR~|~Bridge repair Uni-31-9.95 over Bokes Creek. SFN 8000506 119110~|~1~|~1~|~01/NFA~|~D3 PR 93265~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 2303515 FAI SR664 4.66 Intersect: Little Rush Creek; BR Eligible for Rehabilitation: Length=145 SD/FO(1) SR=68.5 DSR=5 90383~|~1~|~1~|~01/CMQ~|~Normal Project participation using 100% MORPC CMAQ/4TB7 funding for signals 87822~|~1~|~1~|~01/STR~|~General System Minor Rehab. on BEL-250-0.00 to 6.65; includes asphalt overlay, pavement repairs, pavement marking 87822~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on BEL-40-27.54 to 28.50 and BEL-250-6.65 to 9.64; includes asphalt overlay, pavement repairs, pavement marking 112176~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span. 114996~|~1~|~1~|~01/NFP~|~All work in this plan split funded by district allocations using 100% state funds, SAC 4PS7. 88974~|~1~|~1~|~01/IMS~|~District Allocation 91739~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a chip seal treatment. WAS 26 1.79-2.19. Urban federal aid funded 80% Federal/20% State. 91739~|~1~|~3~|~03/STR~|~Two-lane resurfacing project using a chip seal treatment. NOB 564 0.00-0.03, MOE 26 5.59-14.60, MOE 145 0.00-8.30, NOB 565 0.00-2.88, WAS 26 2.19-11.79. Rural other federal aid funded 80% Federal/20% State. 91739~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using a chip seal treatment. MOE 26 21.65-29.45, MRG 669 5.62-11.92 and NOB 564 0.05-13.50. Not on any federal aid system funded 100% State. 119368~|~1~|~1~|~01/S>2~|~Resurfacing 104698~|~1~|~1~|~01/NFA~|~Cold storage building Miami County FS facility. 110398~|~1~|~1~|~01/MPO~|~Reconstruct roadway from Providence Avenue to Villa Road. 116957~|~1~|~1~|~01/S>2~|~Resurfacing 90900~|~1~|~1~|~01/IMS~|~Plan split for all paving work. 104264~|~1~|~1~|~01/SAF~|~Installing raised pavement markers on various county routes throughout Trumbull County. 86687~|~1~|~1~|~01/NFA~|~Safe Routes to school project adding sidewalks, light pathways, upgrade and add new crosswalks and a bike rack at the Fairview School in Dayton. 122591~|~1~|~1~|~01/ERD~|~Stabilize Faraday Road by piping and filling a ravine that parallels the roadway and has seen excessive ongoing erosion. Roughly from Cass Avenue for 800 feet to the southeast. 102957~|~1~|~1~|~01/S<2~|~STP < 200000 ? ASD-42-2.92 to 3.63 & RIC-42-13.13 to 17.52 102957~|~1~|~3~|~03/S<2~|~STP < 200000 (City of Ashland ? 80/20 Fed/City) ? ASD-42-3.63 to 3.80 102957~|~1~|~7~|~07/SAF~|~Install Centerline Rumble Stripes using Approved Safety Funds: RIC-42-16.39 (Fleming Falls Rd) to 18.05 (RIC/ASD Co.) ASD-42-0.00 (RIC/ASD Co.) to 1.00 (SR603) ASD-42-1.34 (TR1353) to 2.77 (TR1536) 102957~|~1~|~2~|~02/STR~|~STP Rural ? ASD-42-0.00 to 2.92 & RIC-42-17.52 to 18.05. 102957~|~1~|~4~|~04/S<2~|~STP < 200000 (City of Ashland ? 100% City) ? ASD-42-3.63 to 3.80 102957~|~1~|~5~|~05/STR~|~STP Rural Bridge Work ? SFN 7003072 102957~|~1~|~6~|~06/S<2~|~Bridge work - STP < 200000 ? SFN 0301086 109250~|~1~|~1~|~01/NFP~|~Guardrail replacements and upgrades on various routes throughout District 4. 109250~|~1~|~2~|~02/NFP~|~Replacement of Type A terminal ends. 90867~|~1~|~1~|~01/S>2/PICK~|~"01/S>2/OT/PICK" - City of Pickerington SRTS project. 4SC7 (100% Federal) CAP $191,741 ($300,000.00 minus $108,259.00 {RW & PE}) All purpose path from Fai-TR 222-00.31 to 00.64 City of Pickerington responsible for costs above the CAP. 120464~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads at Lake Logan State Park. 80551~|~1~|~1~|~01/BRO~|~4800303 LUC SR2 18.62 Intersect: Maumee River,Rrs&Streets 116919~|~1~|~1~|~01/BRO~|~Bridge Deck Repair 4067~|~1~|~1~|~01/MPO~|~Major widening 93944~|~1~|~1~|~01/NFP~|~100% State Funds (4PS7) for district wide auxiliary pavement marking. 115715~|~1~|~1~|~01/NHS~|~plan split NHS location CLI-73-1.795 115715~|~1~|~2~|~02/STR~|~plan split for rural location CLI-73-20.74 and CLI-350-15.78 82380~|~1~|~3~|~03/BRO~|~BR funds used for bridge 1806912. 82380~|~1~|~2~|~02/IMS~|~80/20 fed/state funding split for all work using major programs funding for all structures: 1807838, 1807862, 1807897, 1806785, 1806815, 1806874, 1806904, 1806939 82380~|~1~|~1~|~01/IMS~|~80/20 fund split for all pavement work using TRAC or other major program funding. 118119~|~1~|~1~|~01/NHS~|~added plan split. 105206~|~1~|~1~|~01/STR~|~This plan split is for rural routes. 105206~|~1~|~2~|~02/S>2~|~This plan split is for the large urban sections 105206~|~1~|~3~|~03/S5K~|~This plan split is for the small urban section 105206~|~1~|~4~|~04/STR~|~Plan Split for bridge work included in the project. 123675~|~1~|~1~|~01/NHS~|~culvert plan split. 89145~|~1~|~1~|~01/NFP/HAN~|~Work to replace the bridge. 95% state funds SAC 4C87. The County Engineers Association of Ohio (CEAO) and ODOT approved the project to be part fo the Federa/State Exchange Program. The 5% match is provided by the Hancock County Engineer. 99486~|~1~|~1~|~01/IMS~|~Slide repair along Northbound IR-77 (SLM 0.26 to SLM 0.55) in the City of Green, Summit County, Ohio. 110685~|~1~|~1~|~01/S<2~|~Slide repair PIK 551 1.35 117463~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 84747~|~1~|~1~|~01/NHS~|~Add an additional left turn lane from SR 4 to NB Liberty Fairfield Road, installing additional through lanes on Liberty Fairfield Road, improve pedestrian mobility in and around the project area. Sponsor Butler County 97493~|~1~|~1~|~01/BRO~|~Repair or line existing CMP structure. 123363~|~1~|~1~|~01/SAE~|~Extend the northbound turn lane to 600 ft at Hamilton Rd (SR 317) and Williams Rd. 95771~|~1~|~2~|~02/S5K~|~SEN-18 from SLM 15.379 to 15.923 95771~|~1~|~1~|~01/STR~|~SEN-18 from SLM 15.923 to 17.93 & SEN-4 from SLM 7.52 to 13.23 85396~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for STP funds 85396~|~1~|~2~|~02/NFP~|~Work items not eligible for federal-aid 23449~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 90285~|~1~|~2~|~02/NHS~|~SFN 5702917 MOT 35 1876 structure will either be replaced or repaired. Will adjust description once we know if we will have TRAC funding. 90285~|~1~|~1~|~01/NHS~|~Modification of the interchange of US 35 and Smithville Road on US 35 (SLM 18.82 to 19.56): Smithville Road-Barstow Avenue to Linden Avenue. 103268~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 76404~|~1~|~1~|~01/IMS~|~See Linked Structures. 90444~|~1~|~1~|~01/NFA~|~Concrete bridge deck overlay project on VIN 356 0330 (SFN 8203121). Funded 80 federal/20 state. 25594~|~1~|~4~|~04/IMS~|~Major rehab funding for five noise walls:Spicewood (NW corner of 70/Alton Darby)Wexford Green (S of 70 between Alton Darby and Hilliard Rome)Trabue Woods (NW corner of 70/270)Hilliard Run (N of 70 between existing wooden noise wall and Hilliard Rome entrance rampAdditional wall N of 70 by Hilliard Rome 25594~|~1~|~3~|~03/IMS~|~Use $400,000 of D6 funds first, then go to 7PM7Conc deck overlays or deck replacements on 8 structures:2503905 FRA IR70 4.17 Intersect: Clover Groff Ditch2503964 FRA IR70 4.17 Intersect: Clover Groff Ditch2504057 FRA IR70 6.3 Intersect: Over Ns Rr2504081 FRA IR70 6.3 Intersect: Over Ns Rr2504111 FRA IR70 6.78 Intersect: Over Ramps To 70E & 270S2504146 FRA IR70 6.78 Intersect: Over Ramps To 70E & 270S2504200 FRA IR270 6.9 Intersect: Over Ir 2702504235 FRA IR270 6.9 Intersect: Over Ir 27002/IMS/BR/ 25594~|~5~|~5~|~05/IMS~|~HSP funding for Ramp D improvements. Funds transferred from FRA-CR3-12.96, PID Number 98557. 25594~|~1~|~1~|~01/IMS~|~D6 funding for resurfacing and guardrail, drainage, and signs from SLM 3.41-5.27 25594~|~1~|~2~|~02/IMS~|~Major rehab funding pvmt split from SLM 5.27-7.60Use $84,310 of 4SW7 first, then go to 7PM7 25594~|~1~|~6~|~06/IMS~|~Contractor reimbursement for repairs due to vehicle accidents 93898~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) district wide. 100% state 103420~|~1~|~2~|~02/NHS~|~2" Mill and Fill on NHS route in the City of Englewood - UPP.MOT-49 SLM 7.87 to 8.16 103420~|~1~|~1~|~01/NHS~|~2" Mill and Fill on NHS route in the City of Clayton - UPP.MOT-49 SLM 6.40 to 7.87MOT-49 SLM 8.16 to 8.82 101250~|~1~|~1~|~01/STR~|~Plan Split 01 includes SR and non-NHS US routes. 107668~|~1~|~1~|~01/NHS~|~ Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 95001~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 117709~|~1~|~1~|~01/BRO~|~ All the work of the project. 80% federal funds and 20% state funds from the District budget. 98896~|~1~|~1~|~01/S<2~|~Demo a Res. at 400 N. Mill Street, Orrville, Ohio 101179~|~1~|~1~|~01/STR~|~AC overlay on US 42 and SR 314 110265~|~1~|~1~|~01/SAF~|~Project entails mitigating twelve active landslides occurring within upslopes along 2.2 miles of US50. 123385~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 111005~|~1~|~1~|~01/NHS~|~Split for bridge work 104986~|~1~|~1~|~01/NFP~|~Systematic sign and support replacement along STA I-77 from TUS County Line to US-30 and US 30 from Belden Ave to Trump Ave. 120233~|~1~|~1~|~01/S5K/MTVE~|~Reconstruction of Edgewood Road in city of Mount Vernon 117211~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement. 89314~|~1~|~1~|~01/S<2~|~Improve Mall Rd including widening, signals, turn lanes, etc., from Banfield Rd to US 40. Project to include widening on US 40 from Mall Rd to Eric Dr. Also construction of new connector roadway from US 40 south to intersection of Mall Rd/Banfield Rd. 100168~|~1~|~1~|~01/NFP~|~100% STATE FUNDING FOR DRIANAGE CLEANOUT WORK. 97737~|~1~|~1~|~01/NFP~|~Added plan split due to funding 113757~|~1~|~1~|~01/NHS~|~Deck replacement > 20' span. 98016~|~1~|~1~|~01/NFP~|~Construction Inspection Agreement 124236~|~1~|~1~|~01/IMS~|~Plan split for bridge replacement work 23455~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 4306155 92507~|~1~|~2~|~02/STR~|~Repair embankments at various places along SR-43502/STR/OT/ 92507~|~1~|~1~|~01/NHS~|~Repair embankments along various places on US-3501/NHS/OT/ 115227~|~1~|~1~|~01/SAF/TUS~|~Guardrail upgrade/replacement on various county routes with 100% (4HB7) CEAO Safety funding. 101284~|~1~|~1~|~01/STR~|~Resurfacing. 101284~|~1~|~2~|~02/STR~|~100% Locally funded plan split to replace curbs on N Liberty St. (US-127) from Jackson St. (US-20A) to Legion Dr. 113722~|~1~|~1~|~01/SAF~|~Realign Mason Morrow Millgrove Road west of Columbia Road North. Add a westbound right turn lane, sign and pavement marking improvements, etc. 113722~|~1~|~2~|~02/SAF/LEB~|~Plan split for 100% locally funded full depth reclamation outside the limits of the ODOT safety improvement. 108734~|~1~|~2~|~02/NHS~|~Smoothseal PIK-32-15.77 to 20.14Suspend/Resume 16.63-16.94 for R-Cut (J-Turn). 108734~|~2~|~1~|~01/NHS~|~PIK 32 16.63-16.94 Safety project constructing an R-Cut (J-Turn) at the intersection of PIK 32 and Shyville Rd. 87186~|~1~|~1~|~01/STR~|~4003055 JAC SR279 4.06 Intersect: Holland Fork80 Fed/20 State. 01/STR/BR/State 97237~|~1~|~1~|~01/NHS~|~Traffic study for various alternatives for reducing congestion and improving safety in and around ATH US 33 E State Street interchange. ATH 33 14.99 97237~|~1~|~2~|~02/S<2~|~Traffic study for various alternatives for reducing congestion and improving safety in and around ATH US 33 E State Street interchange. ATH 33 14.99 114240~|~1~|~1~|~01/IMS~|~Maintenance of Traffic contract for BSB. 109259~|~1~|~1~|~01/S<2~|~This project will consist of widening SR 703 to include a new 305? (which includes a 50-foot taper) eastbound left-turn lane and a new 285? (which includes a 50?-foot taper) westbound right-turn lane into the proposed Tri-Star 2.0 site. This project also includes the installation of a traffic signal with advanced detection and a pedestrian crossing to the Wight State Campus. 121187~|~1~|~1~|~01/STR~|~STP Rural Plan Split 122397~|~1~|~1~|~01/NFA~|~Plan split for crack sealing at Middle Bass Island State Park 116493~|~1~|~1~|~01/STR~|~Replace or Repair Culverts 90430~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 145 1163 (SFN 5602130). Rural other federal aid funded 80 federal/20 state. 87126~|~1~|~1~|~01/IMS~|~Preventative Maintenance on the Priority System in Clermont County for FY2019. Routes include I-275 115341~|~1~|~1~|~01/MPO/STRE~|~Resurfacing. 93918~|~1~|~3~|~03/NFP~|~All work outside curbs and deeper than 3.5" between SLM 13.28 and 14.99. (curb curb ramps, sidewalks, full depth repairs,....) 93918~|~1~|~1~|~01/NHS~|~Urban Paving from SLM 13.28 to SLM 14.56 (NHS) all pavement work from curb to curb up to a depth of 3.5". (Secor to Monore) 93918~|~1~|~2~|~02/S>2~|~Urban paving from SLM 14.56 to SLM 14.99 non-NHS. Monroe to Upton. 116896~|~1~|~1~|~01/MPO/ALLI~|~Resurfacing. 117342~|~1~|~1~|~01/BRF~|~Primary Plan Split for Local Bridge Program eligible scope items 123802~|~1~|~1~|~01/STR~|~stp rural 88853~|~1~|~2~|~02/NFA~|~This split is for the portion of SR 293 being resurfaced in this project that is north of CR 330. This portion of SR 293 is classified as a Rural Minor Collector and cannot use federal funds for resurfacing. 88853~|~1~|~1~|~01/STR~|~This split is for the portion of SR 293 being resurfaced in this project that is south of CR 330, and overlapping CR 330. This portion of SR 293 is classified as a Rural Major Collector and can use federal funds for resurfacing. 110073~|~1~|~1~|~01/IMS~|~FAY 71 from 9.46 to 14.66 and MAD 71 from 0.00 to 4.56. AC Overlay with repairs and upgrade guardrail as needed. 110073~|~1~|~2~|~02/IMS~|~FAY 71 and MAD 71 bridge work. Sweeping & cleaning of bridges, sealing decks 94661~|~1~|~1~|~01/NFA~|~rehabilitation of Washington and Reid Avenues. 76785~|~1~|~1~|~01/IMS~|~100% UNFU plan split 114501~|~1~|~1~|~01/BRF/LISB~|~Construction of bridge with 95% Municipal Bridge funds (4R87 includes 15% Toll Revenue Credit) and 5% Local funds (4BG7). 105563~|~1~|~1~|~01/STR~|~Rural plan split: MAD-40-3.03-13.92 MAD-40-14.96-15.59 MAR-257-0.35-0.65 MRW-19-8.78-10.40 MRW-61-0.00-1.15 MRW-61-1.71-3.27 MRW-61-14.83-22.86 PIC-752-2.32-8.43 UNI-4-14.88-24.28 UNI-42-0.00-4.84 105563~|~1~|~2~|~02/S<2~|~Marion urban area plan split: MAR-423-6.19-7.46 105563~|~1~|~3~|~03/S<2~|~Ashville - S. Bloomfield urban area plan split: PIC-752-0.00-2.32 105563~|~1~|~4~|~04/NHS~|~NHS plan split: PIC-23-0.00-1.49 105563~|~1~|~5~|~05/S<2~|~Marysville urban area plan split: UNI-4-14.06-14.88 122044~|~1~|~1~|~01/STR~|~Construct roundabout at the intersection of DEL SR 61 and SR 521 119926~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT/ - Plan Split 1 83449~|~1~|~1~|~01/IMS~|~District Allocation - Bridge Replacements LOR-090-13.20 L&R and LOR-090-13.55 L&R 83449~|~1~|~2~|~02/IMS~|~Consultant ongoing services for design 89161~|~1~|~1~|~01/NFA~|~"01/BRF/BR/MUEN" - CEAO Funding 4B87(80% Federal) / 4BG7(20% Local) - CEAO CAP = $424,800.00 federal requiring local match - Replacement of 6035639 MUS CR427 0.03 Intersect: Brush Creek Tributary; BR Eligible for Replacement: Length=26 SD/FO(1) SR=22.3 DSR=5 107773~|~1~|~2~|~02/NHS~|~General System Resurfacing: FRA-33-4.35-4.43 FRA-33-4.86-8.77 107773~|~1~|~1~|~01/NHS~|~Urban Paving in the City of Columbus: FRA-33-4.43-4.86 107773~|~1~|~3~|~03/NHS~|~Items to be paid 100% by the City of Columbus 107773~|~1~|~4~|~04/NHS~|~Replacement of the culvert at SLM 7.20 with a larger culvert 109012~|~1~|~1~|~01/NFA~|~Culvert replacement at HOL-520-9.85 and 9.89. 96971~|~1~|~2~|~02/STR~|~Resurfacing and berm stabilization CR 81 from Burkettsville to SR 119. 96971~|~1~|~1~|~01/S<2~|~Resurfacing and berm stabilization CR 170 from SR 49 to SR 118 108666~|~1~|~1~|~01/NFA~|~Landslide repair 121431~|~1~|~1~|~01/NFP~|~Crack Sealing 96633~|~1~|~1~|~01/NFP~|~Upgrade Existing HAR Signs in District 8 124563~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded roundabout 119608~|~1~|~1~|~01/ERD~|~Plan split for eligible work to replace the structure (bridge SFN 1830988). 89454~|~1~|~1~|~01/BRF~|~"01/BRF/BR/PERR" - Perry County Bridge replacment project on CR41 over a stream utilizing Forest Highway funds with a project cap of $348,000. 105208~|~1~|~1~|~01/NHS~|~plan split for the NHS portion of CLE-125 83031~|~1~|~2~|~02/IMS~|~D6 federal/state funding for minor bridge work on 3 bridges:2513080 FRA IR270 0.14 Intersect: Under Ramp 71Sb To 270Eb2513447 FRA US23 5.17 Intersect: Under Ramp L 23N-270W2513536 FRA IR270 52.64 Intersect: Under Ramp L 23N-270W 83031~|~1~|~1~|~01/IMS~|~D6 federa/state funding for pavement repair, ramp resurfacing, minor safety improvements (rumble strips, widen outside shoulder, superelevation) at 270/23 ramps 114928~|~1~|~1~|~01/STR~|~Resurfacing. 121070~|~1~|~1~|~01/STR~|~SR 148 Resurfacing 101107~|~1~|~1~|~01/BRF~|~CEAO funded Bridge Replacement 121415~|~1~|~1~|~01/MPO~|~Federal items. 100738~|~1~|~1~|~01/IMS~|~Spot concrete slab repairs at various locations on FRA IR 70 105604~|~1~|~1~|~01/NHS~|~NHS plan split: DEL-23-17.75-20.84 FRA-3-20.39-20.71 FRA-3-20.71-21.36, 21.47-21.50,21.80-22.14, 22.18-22.20, 22.26-22.63, 22.64-22.77, 22.84-22.89, 22.91-23.04 FRA-161-17.12-17.30 FRA-33-22.33-24.27 FRA-40-7.00-7.60 105604~|~1~|~2~|~02/IMS~|~Interstate plan split: FRA-270-43.24-48.47 FRA-270-52.16-52.72 105604~|~1~|~4~|~04/S>2~|~Columbus urban area plan split: FRA-104-0.00-1.49, 1.66-1.68, 1.73-3.40, 3.68-3.71, 4.08-4.97 105604~|~1~|~3~|~03/S>2~|~Columbus Urban Paving plan split: FRA-3-20.39-20.71 FRA-3-21.36-21.47, 21.50-21.80, 22.14-22.18, 22.20-22.26, 22.63-22.64, 22.77-22.84, 22.89-22.91, 23.04-23.07 105604~|~1~|~5~|~05/S>2~|~Grove City Urban Paving Plan Split: FRA-104-1.49-1.66, 1.68-1.73, 3.40-3.68, 3.71-4.08 89835~|~1~|~1~|~01/IMS~|~Phase 8A of the Mill Creek Expressway Project. This phase will replace Bridge No. HAM-75-0701, Seymour Ave. over I-75. This project is needed to allow future mainline construction be completed under PID 77889, Phase 8. 89835~|~1~|~2~|~02/IMS~|~Reconstruct portions of IR bridge. 108748~|~1~|~1~|~01/SAF~|~Safety money 108748~|~1~|~2~|~02/S<2~|~100% City resurfacing 121183~|~1~|~1~|~01/NHS~|~Urban paving 121107~|~1~|~1~|~01/MPO~|~Primary Plan Split for MPO CRP funded scope. 111350~|~1~|~1~|~01/NFP~|~Plan split for drainage work. 83923~|~1~|~1~|~01/STR~|~0100870 ADA SR41 5.2 Intersect: Mussel Run80 fed/20 state 01/STR/BR/State 113066~|~1~|~1~|~01/STR~|~AC Overlay with repairs on: CLE US 50 SLM 7.8 to 8.6 94817~|~1~|~1~|~01/BRO~|~Design and replace the existing bridge 109824~|~1~|~1~|~01/STR~|~HIG 41 0.00-7.36 109824~|~1~|~2~|~02/STR~|~Bridge PM. 90438~|~1~|~1~|~01/BRF~|~Project includes replacement of structurally deficient Bridge No. PRE-CR 45-0100 (SFN: 6835414), which serves to carry CR-45 over Paint Creek. Improvements include pavement repairs, and improvements to the vertical alignment/profile of the roadway. 123267~|~1~|~1~|~01/SAF~|~Guardrail maintenance. 123267~|~1~|~2~|~02/SAF~|~Guardrail replacement. 94122~|~1~|~2~|~02/STR~|~See linked structure > 20' 94122~|~1~|~3~|~03/STR~|~See linked structure 10' to 20' span. 94122~|~1~|~1~|~01/STR~|~Resurfacing of STA SR 241 from SLM 0.00 to 3.50. 98363~|~1~|~2~|~02/S>2/BARB~|~Resurfacing of Fairview Avenue from N Van Buren Ave SLM 5.13 to 5th St NE/SR 619 SLM 5.19, in the City of Barberton. 100% city costs. 98363~|~1~|~1~|~01/MPO/BARB~|~Resurfacing of North Van Buren Avenue from Robinson Avenue SLM 0.52 to Fairview Avenue SLM 1.58 including full and partial depth repairs, in the City of Barberton. Resurfacing of Fairview Avenue from Norton Ave/Coventry Rd SLM 4.95 to North Van Buren Avenue SLM 5.13, in the City of Barberton. 101994~|~1~|~1~|~01/NFP~|~Mowing 120545~|~1~|~1~|~01/S>2/HCEO~|~CEAO funded replacement of a Hamilton County Engineer's Office maintained bridge not on the federal aid system. 93900~|~1~|~1~|~01/S>2~|~Resurfacing of CR-98 (Highland Avenue) from Brunstetter Road to Warren Township line, in the Village of Lordstown, Trumbull County, Ohio. Includes guardrail, signs, striping. 112978~|~1~|~1~|~01/IMS~|~Repair the inverts of the bridge size culverts HAM-71-1351 and WAR-71-0358E. Extend the paved invert to the springline of the HAM-71-1929 bridge size culvert with reinforced concrete. 112978~|~1~|~2~|~02/IMS~|~Pave the invert of small culvert 112978~|~1~|~3~|~03/IMS/WCEO~|~This funding event is for the local portion of the WAR-71-0358E structure that is under Columbia road and begins between the NB Exit Ramp and Columbia Rd and ends at the eastern pipe outlet. 93512~|~1~|~1~|~01/IMS~|~Type B Emergency to resurface the surface course only on the eastbound through lanes of Preble I-70 for 1.5 miles due to multiple delaminations. 112404~|~1~|~1~|~01/SAF~|~Downtown Safety Project with pedestrian upgrades and streetscape improvements 112404~|~1~|~2~|~02/SAF~|~Safety funding for pedestrian improvement related project items of lighting, signal upgrades, and improved crossings (curb bump outs, RRFBS, signage, markings, etc.) 109973~|~1~|~1~|~01/NHS~|~Signal upgrade. 123503~|~1~|~1~|~01/SAF~|~Realignment of WAS SR 26, WAS CR 17 and Goose Run Road to eliminate conflicts with turning traffic. Work includes WAS 26 3.75, CFN 1885009 culvert replacement and WAS 26 3.76, CFN1807419 culvert will be extended. 105634~|~1~|~1~|~01/STR~|~plan split 90268~|~1~|~1~|~01/S>2~|~Mahoning Rd 1.69-2.35 Major New Construction Earthwork 92960~|~1~|~1~|~01/S<2/PICK~|~"01/S<2/PV/PICK" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving on 1) Fai-SR 256-00.00 to 00.50; 2)Fai-SR 256-02.50 to 05.99; 92960~|~1~|~2~|~02/S<2/PICK~|~"02/S<2/OT/PICK" - District Preservation Marking Pavement Program 4PS7(80% State) / 4BG7(20% Local) - No CAP - Marking Pavements for Urban Paving on 1) Fai-SR 256-00.00 to 00.50; 2)Fai-SR 256-02.50 to 05.99; 113367~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using CSTP funds. GAL CR 77 0.00-3.254. Funded 80 Federal/20 Local. 113367~|~1~|~3~|~03/STR~|~Two-lane resurfacing project using CSTP funds. Rural federal aid funded 80 Federal/20 Local. 113367~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using CSTP funds. Urban other federal aid funded 80 Federal/20 Local. 93287~|~1~|~1~|~01/S<2~|~General system paving in the urban func class areaDEL-203: 0-0.02 93287~|~1~|~2~|~02/STR~|~General system paving in the rural func class areaDEL-203: 0.02-9.10 94004~|~1~|~1~|~01/NFP~|~Work to replace the bridge. Part of the Federal/State Exchange Program. State funds SAC 4C87 with the match provided by Wyandot County SAC LNTP. 101016~|~1~|~1~|~01/NFP~|~Repair and resurface park pavement 115115~|~1~|~1~|~01/IMS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 77 SB. 121534~|~1~|~1~|~01/SAF~|~Raised pavement markers 105108~|~1~|~1~|~01/STR~|~SCI 125 2.90 (SFN 7303300) bridge replacement. 107518~|~1~|~1~|~01/SAF~|~Installation of signage and pavement markings on local roadways. 81933~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement 85377~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. 111951~|~1~|~1~|~01/NHS~|~UPP - 1 3/4" mill and fill with super-pave asphalt in the City of Urbana. 111951~|~1~|~2~|~02/NHS~|~NHS - District paving outside Urbana corp 98504~|~1~|~1~|~01/NHS~|~LOR-6-12.36-15.86 Resurfacing 98504~|~1~|~2~|~02/NHS~|~100% Sheffield Lake Items 98504~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 96593~|~1~|~1~|~01/NHS~|~NHS route resurfacing 96593~|~1~|~2~|~02/NHS~|~Split for culvert work 123592~|~1~|~1~|~01/S5K~|~added culvert plan split. 93239~|~1~|~1~|~01/MPO~|~Construct a bikepath from Cosler Avenue and Alexander Drive to the Creekside Trail. 111392~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 35 3.47 (CFN 1820878) Liner, GAL 35 3.54 (CFN 1820879) Liner, and GAL 35 9.23 (CFN 1819523) Pave Invert. NHS route funded 80 Federal/20 State. 115978~|~1~|~1~|~01/S5K~|~Installation of two enhanced multi-use trail crossings. 122388~|~1~|~1~|~01/S>2~|~Pland split for construction of all purpose trail 123617~|~1~|~1~|~01/NHS~|~Plan Split for NHS 107597~|~1~|~2~|~02/SAF~|~Additional Advanced radar at LOR US 0020 & SR 0058. 107597~|~1~|~1~|~01/SAF~|~Freight Radar Detectors 112393~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 113912~|~1~|~1~|~01/IMS~|~Repair and Replace portions of the bridge approach barriers on the ramp from Southbound I-275 to eastbound SR 32. 123055~|~1~|~1~|~01/STR~|~NOB-CR VAR GR FY29 91340~|~1~|~1~|~01/STR~|~General system resurfacing of SR-529 from Marion County line to SR-61 101317~|~1~|~1~|~01/STR~|~Chip seal on the the following STP Rural routes: PIC-188-2.88 to 8.03, PIC-207-0.00-9.57, PIC-361-0.00-4.67 101317~|~1~|~3~|~03/NFA~|~Work on FAY-753-0.15 to 5.52. This section is not on the Federal Aid System 101317~|~1~|~2~|~02/S<2~|~Chip seal on PIC-188-2.57 to 2.88 105343~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 4: Viaduct repairs including deck patching, expansion joint repairs, concrete patching, beam painting, and miscellaneous structural repairs. 88719~|~1~|~1~|~01/NFA~|~4404920 LAW SR775 18.05 Intersect: Trib Of Buckeye Creek100% State. Brdg Replacement. BR funds eligible for rehab only, not replacement. 01/NFA/BR/State 97096~|~1~|~1~|~01/STR~|~Bridge rehab project. Work includes deck edge repair, pile encasement, and erosion prevention. MEG 248 4.28, SFN 5302617. Rural other federal aid funded 80 federal/20 state. 100394~|~1~|~1~|~01/BRF~|~SFN 4863186 120328~|~1~|~1~|~01/NFA/GENE~|~Non infrastructure Safe routes to school. 97895~|~1~|~2~|~02/S>2~|~CR50 (OC 038) roadway repair and overlay 97895~|~1~|~1~|~01/S>2~|~CR50 (OC 038) This project will widen the existing 2 lane, 24' wide roadway by adding 4' shoulders on each side for on-street becycling and pedistrian accomodation. 90819~|~1~|~1~|~01/S<2~|~7200625 SAN US6 18.83 Intersect: Us-20 Us-6 Sr-19 104855~|~1~|~1~|~01/NFA~|~The Port will install approx. 1400' of new roadway starting at the intersection of Jeep Pkwy in the Overland Industrial Park 122439~|~1~|~1~|~01/BRO~|~Bridge replacement 121530~|~1~|~1~|~01/STR~|~STP Rural Plan Split 121530~|~1~|~2~|~02/S5K~|~STP 5000 Plan Split 109539~|~1~|~1~|~01/NFP~|~Spot paving treatments throughout District 5 121482~|~1~|~1~|~01/NHS~|~NHS Plan Split 124694~|~1~|~1~|~01/BRO~|~3 Span box beam super replacement. 101524~|~1~|~1~|~01/NHS~|~Storm Sewer Replacement at HUR-224 and Bullhead Road 88972~|~1~|~1~|~01/NHS~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 80/20 split01/NHS/PV/State 88972~|~1~|~4~|~04/S<2~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 Brdgs F/Rehab:4404041 LAW CR123 0.2 Intersect: Symmes Creek & Cr 123A4404076 LAW CR123 0.2 Intersect: Symmes Creek & Cr 123A80/20 split04/S<2/BR/State 88972~|~1~|~2~|~02/NHS~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 Brdgs F/Rehab:4401174 LAW US52 22.53 Intersect: Ohio River4403908 LAW US52 22.29 Intersect: Sr 74403967 LAW US52 22.32 Intersect: County Road 14403991 LAW US52 22.32 Intersect: County Road 180/20 split01/NHS/BR/State80/20 split02/NHS/BR/State 88972~|~1~|~3~|~03/S<2~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 80/20 split03/S<2/PV/State 106396~|~1~|~1~|~01/SAF~|~Bike lanes on S. Souder Ave. from Sullivant Ave. to Mound St. Sidewalk on the Buchanan/Van Buren Dr. loop south of S. Souder Ave. and sidewalk on Toronto St. from Trevitt St. to N. Champion Ave. 94351~|~1~|~1~|~01/NFP~|~01/NFP/BR ; All work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7. 114286~|~1~|~1~|~01/IMS~|~Mowing contract in D8 114286~|~1~|~2~|~02/IMS~|~Mowing in MOT Co - D7 121934~|~1~|~1~|~01/SAE~|~Construct new roundabout. 112766~|~1~|~1~|~01/STR~|~Resurfacing SR 9 90822~|~1~|~1~|~01/MPO~|~Construct two types of bike bath which include a 10' wide, concrete path installed next to a street and a 10' wide asphalt path installed along a former railroad route at the Northeast corner of Stroop Road and Wilmington Pike to the Southwest corner of Woodman Commerce Drive and Dorothy Lane (Delco Park). 106749~|~1~|~1~|~01/MPO~|~Intersection work at the Edgehill Rd/Overlook Rd intersection that is eligible for federal-aid. 91901~|~1~|~1~|~01/IMS~|~Spot paving at various locations on FRA IR 71 and FRA IR 670 97639~|~1~|~1~|~01/BRO~|~Bridge Repair of accident damage 92575~|~1~|~2~|~02/STR~|~Widen Ashville Pike from Duvall to Rickenbacker33% of costs attributed to rural func class area02/STR/PV/ 92575~|~1~|~1~|~01/S<2~|~Widen Ashville Pike from Duvall to Rickenbacker67% of costs attributed to Ashville urban area01/S<2/PV/ 117919~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-F 106254~|~1~|~1~|~01/NHS~|~Concrete deck overlay project. HOC 33 13.13 L & R, HOC 33 14.01 L & R. NHS route funded 80 federal/20 state. 95441~|~1~|~1~|~01/NFP~|~Construction of 7 coverall structures for cold mix storage located at ATH, GAL, HOC, MEG, MRG, NOB, and VIN. Funded 100% state. 111671~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2026. Funded 100% state. 108653~|~1~|~1~|~01/NFP~|~Wooster proposes to extend Daisy Way 2,000? to connect with Old Airport Road creating additional access to the industrial pa 123618~|~1~|~1~|~01/NHS~|~Funding split for NHS 118538~|~1~|~1~|~01/NFA~|~Split for bridge replacement work. 94265~|~1~|~6~|~06/NHS~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Urban portions of SR 48 where the pay items are 100% State since it is outside the corporation limits of the City. (SLM 10.88 to 11.22) 94265~|~1~|~1~|~01/STR~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Rural portion of SR 48 where the pay items are split 80% State and 20% City. (SLM 10.4 to 10.68) 94265~|~1~|~2~|~02/STR~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Rural portion of SR 48 where the pay items are split 100% City. (SLM 10.4 to 10.68) 94265~|~1~|~5~|~05/STR~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Rural portions of SR 48 where the pay items are 100% State since it is outside the corporation limits of the City. (SLM 10.68 to 10.88) 94265~|~1~|~3~|~03/NHS~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Urban portions of SR 48 where the pay items are split 80% State and 20% City. (SLM 10.09 to 10.40 and SLM SLM 11.22 to 11.51) 94265~|~1~|~4~|~04/NHS~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Urban portions of SR 48 where the pay items are 100% City. (SLM 10.09 to 10.40 and SLM SLM 11.22 to 11.51) 93644~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 84279~|~1~|~1~|~01/BRO~|~Replace existing twin CMP (BEL-800-1362, SFN 0705640) with new twin CMP. 96808~|~1~|~1~|~01/IMS~|~Pavement split for interstate work 96446~|~1~|~1~|~01/NFP~|~Repair of damaged bridge beams, Hubbard Township, Trumbull County, Ohio. 113001~|~1~|~1~|~01/IMS~|~Repair culvert. 113001~|~1~|~2~|~02/STR~|~Culvert repair. 82878~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 33 28.68-28.76. NHS route funded 80 federal/20 state. 82878~|~1~|~2~|~02/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 124 29.60-38.70. Rural other federal aid funded 80 federal/20 state. 102151~|~1~|~1~|~01/NFA~|~The City will be engineering and reconstructing an existing road known as West Nationwide Blvd, the newly constructed road will be approximately 1800 feet in length. 95385~|~1~|~1~|~01/BRF~|~Total rehabilitation of Bridge No. GRE-CR 76-0230, an existing historic timber truss covered bridge. 97421~|~1~|~1~|~01/STR~|~Replace two culverts in JEF county. JEF-150-4.97 and JEF-151-1.53 116884~|~1~|~1~|~01/STR~|~STP Rural Plan Split 116884~|~1~|~2~|~02/NFA~|~Plan Split for Rural Minor Collector 109744~|~1~|~1~|~01/STR~|~Resurfacing and related roadway work on COS-79 and minor bridge maintenance. 109744~|~1~|~3~|~03/NFA~|~Resurfacing and bridge maintenance work on SR 657 outside of urban area. 109744~|~1~|~2~|~02/S50~|~Resurfacing along SR 657 within urbanized area. 22633~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Per-SR 13-00.00 to 17.49 93777~|~1~|~1~|~01/IMS~|~Repair/restore expansion joints, patch railing spalls, fix damaged tube railing posts on SFN 7502346 SHE IR 75 1347 TR 57 Meranda Road. 120282~|~1~|~2~|~02/STR~|~Two-lane resurfacing project on WAS CR 375 0.322-2.412. Funded 80% Federal MPO STP/20% Local. 120282~|~1~|~1~|~01/S5K~|~Two-lane resurfacing project on WAS CR 375 0.00-0.322. Funded 80% Federal MPO STP/20% Local. 120282~|~1~|~3~|~03/MPO~|~Two-lane resurfacing project on Rockland Avenue from Farson Street to Middle Street in the City of Belpre. WAS MR 102 0.00-0.42. Funded 80% Federal MPO STP/20% Local. 97618~|~1~|~4~|~04/BRF~|~Replace MRW TR 132-1.36 (Cardington Denmark Rd) structure over Shaw Creek SFN 5931568 97618~|~1~|~5~|~05/BRF~|~Replace MRW-TR 138-146 (Curl Rd) structure over Shaw Creek SFN 5931339 97618~|~1~|~1~|~01/BRF~|~Replace MRW-CR 131-0.31 (Tabor Rd) structure over Shaw Creek SFN 5931126 97618~|~1~|~2~|~02/BRF~|~Replace MRW-CR 137-0.70 (Curtis Rd) structure over Shaw Creek SFN 5931789 & SFN 5931282 97618~|~1~|~3~|~03/BRF~|~Replace MRW-CR 28-1.08 (Cardington-Denmark Martel Rd) structure over Shaw Creek SFN 5930332 123219~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 99432~|~1~|~1~|~01/NFP~|~Crack seal of various routes throughout District 4. 93441~|~1~|~1~|~01/CMQ~|~Signal coordination on State Route 59, from Scranton Street to King Street, in the City of Ravenna. 114824~|~1~|~1~|~01/NHS~|~Installation of center line rumble striping on US 22 & US 250 in Harrison county. 122838~|~1~|~2~|~02/SAF~|~Plan Split for work on the I-71 & SR-123 ramps. 122838~|~1~|~1~|~01/SAF~|~Widen shoulder and adjust superelevation on SR 123 113136~|~1~|~1~|~01/NFP~|~The County will improve 2,021 feet of Phoenix Road as well as upgrade the intersections of Phoenix Road and North River Road, Phoenix Road and Larchmont Ave, and Phoenix Road and Commonwealth Avenue. 117339~|~1~|~1~|~01/IMS~|~All work associated with SFN3111385. 103417~|~1~|~1~|~01/MPO~|~Chessie Circle Trail CMAQ funds 120919~|~1~|~1~|~01/SAF~|~Plan split for lighting work 90422~|~1~|~1~|~01/MPO~|~80% Federal MPO STP / 20% Local funding split for the resurfacing of Columbia Road. 96736~|~1~|~1~|~01/BRO~|~Block PID funding 95800~|~1~|~1~|~01/STR~|~WOO-582 from SLM 5.34 to SLM 16.35 106216~|~1~|~1~|~01/STR~|~Milling and Resurfacing with area improvement on North Fairfield Road within the City of Beavercreek. 87513~|~1~|~1~|~01/BRO~|~Bridge replacement project. MEG 325 0065 (SFN 5302730). Bridge on system eligible funded 80 federal/20 state. 116528~|~1~|~1~|~01/NHS~|~Resurfacing. 114475~|~1~|~1~|~01/MPO/SPR~|~Reconstruction of Northland Boulevard from the Springdale corp. limit west of SR 4 to West Kemper Road. Addition of sidewalk where existing gaps exist. Reconstruction of the traffic signal at Tri-County Parkway. 114475~|~1~|~2~|~02/ENH~|~Adding 1st priority 4BG7 110636~|~1~|~1~|~01/STR~|~Bridge Replacement PIK 335 20.41 93816~|~1~|~1~|~01/STR~|~Resurfacing of CH-09 in Boston Township. Includes improved shoulders, pavement repairs as necessary, catch basin repairs as needed, new pavement markings, guardrail upgrade. From Boston Mills Road (CR-32) to Cuyahoga County line. SLM 13.35 to SLM 14.58. 89064~|~1~|~1~|~01/NHS~|~80/20 fed/local funding split using federal Local Bridge Program and MPO STP funding. No existing SFN available. 89064~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding. 97158~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 691 6.42, SFN 0505552. Rural other federal aid funded 80 federal/20 state. 122570~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ eligible funding work for cargo processing and fiber connectivity of the terminals. 107933~|~1~|~1~|~01/STR~|~Resurface on US127 using district preservation funds (80% Fed and 20% state). 107933~|~1~|~2~|~02/S5K~|~All resurfacing work from SLM 12.346 to 12.395 that falls within the Van Wert urban area boundary. 107933~|~2~|~3~|~03/S5K~|~Resurfacing in the City of Defiance using 80% federal preservation funding with a 20% city match. 107933~|~2~|~4~|~04/S5K~|~100% city cost items such as turn lane arrows and crosswalk markings. 108140~|~1~|~1~|~01/MPO~|~Resurfacing of Ravenna Rd from Twinsburg S Corp to just north of Old Mill Rd. 110682~|~1~|~1~|~01/STR~|~Replace Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek. 101785~|~1~|~1~|~01/NFA~|~The city is constructing a 1,092 linear foot road to give access to the new Quadax facility from Fry Road. 98524~|~1~|~1~|~01/NFA~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7. 100744~|~1~|~1~|~01/IMS~|~Work related to heat straightening of beam on FRA-40 structure. 100744~|~2~|~2~|~02/NHS~|~Split for work on UNI-31 over UNI-33 structure. 112962~|~1~|~1~|~01/IMS~|~FRA-71 from 5.29 to 14.96 and 16.83 to 17.10 87742~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 118571~|~1~|~1~|~01/STR~|~Full depth flexible pavement project. NOB 821 8.31-8.63. 118571~|~1~|~2~|~02/NFA~|~Full depth flexible pavement project. NOB MR 43 0.296-0.356. Funded 100% State. 100235~|~1~|~1~|~01/NFP~|~Chip Sealing ATB US 6 from 23.17 to 25.18, ATB SR 7 from 14.95 to 17.51, ATB SR 193 from 11.09 to 14.57 and TRU SR 609 from 0.00 to 2.65. 94380~|~1~|~1~|~01/STR~|~General System Resurfacing 116939~|~1~|~1~|~01/MPO~|~Resurfacing. 88215~|~1~|~1~|~01/MPO~|~Construct A 10' Asphalt Multi-use trail from the UD parking lot to Jane Newcome Park. 124661~|~1~|~1~|~01/NFA~|~Bridge Rehabilitation 104739~|~1~|~1~|~01/SAF~|~Intersection improvement on Portage Street between Frank Ave and Whipple Ave. 114635~|~1~|~1~|~01/STR~|~Overlay on SCI 772 90357~|~1~|~1~|~01/S<2~|~Culvert Replacement 108614~|~1~|~1~|~01/NHS~|~Landslide repair project. WAS 7 40.30. DSR WAS-016. NHS route funded 80% federal/20% state. 99756~|~1~|~2~|~02/NFP~|~Split for 100% local items. 99756~|~1~|~1~|~01/NFP~|~100% State funded rehab work on the Hope Memorial bridge. 79761~|~1~|~2~|~02/STR~|~District Allocation 79761~|~1~|~3~|~03/NHS~|~NHS Bridge 79761~|~1~|~1~|~01/NHS~|~NHS 79761~|~1~|~4~|~04/STR~|~MED-42-0714 R USR 42 over MED-42-0687MED-42-0261 over W FORK OF E BR BLACK RIV 79761~|~1~|~5~|~05/SAF~|~Wet Reflective/Thermoplastic long line costs for the entire project 79761~|~1~|~6~|~06/SAF~|~Segment CL rumble stripes : US 42, SLM 1.89-2.79 79761~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment 104881~|~1~|~1~|~01/STR~|~SCI 348 9.42 (SFN 7305559) 110189~|~1~|~1~|~01/SAF~|~Tree removal on various County Roads using 90% 4HJ7 and 10% TRC. 98579~|~1~|~1~|~01/BRF/GCEO~|~"01/BRF/BR/GCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - GUE-TR365-860 - SFN 3030768 - BR Eligible for replacement: L=155'; SD/FO=1; SR=26.0; DSR=6; over Wills Creek 98613~|~1~|~1~|~01/NFP~|~Drainage improvements to the Pebble Beach storm sewer adjacent to the Ohio Turnpike in Canfield Township, Mahoning County, Ohio. The proposed improvement will remedy localized flooding resulting from filled drainage pipes and will help preserve the Ohio Turnpike pavement in the area. 91903~|~1~|~1~|~01/IMS~|~Spot repairs on FRA IR 270 and IR 670 (except for 270-38.20 to 38.60 NB) 91903~|~1~|~2~|~02/IMS~|~Paving FRA-270-38.20 to 38.60 NB only. Work due to damage from truck accident. 101752~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Plan Split 1, Gue-209-10.72 to 10.76, Gue-209-10.99 to 11.00, Gue-209-11.03 to 11.16, Gue-209-11.32 to 14.65, Gue-209-14.65 to 15.07 93044~|~1~|~1~|~01/SAF~|~Widen the curves and narrow sections of GAL CR 6 0.00-1.84. Includes resurfacing, berms, and striping. 80% Federal Safety and 20% Local. 104109~|~1~|~1~|~01/NFP~|~plan split 118735~|~1~|~1~|~01/SAF~|~GR project in Scioto County. 113165~|~1~|~1~|~01/CMQ/TWIN~|~Intersection improvement at Shepard Rd/Richmond Rd/Broadway Ave/Ravenna Rd 113165~|~1~|~2~|~02/MPO~|~This split is for the NOACA funding portion of the project 83635~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds. 109308~|~1~|~2~|~02/MPO~|~Carbon Reduction Eligible Items, including 4" Concrete Walk and Curb Ramps. 80% BHJ (TAP) and 20% Local funds. 109308~|~1~|~1~|~01/MPO~|~Lovers Lane widening (all associated items other than those listed for MPO TAP split). 80% BHJ and 20% Local funds. 114668~|~1~|~1~|~01/NHS~|~Placeholder once locations are determined/finalized. 117616~|~1~|~1~|~01/BRF~|~Bridge replacement. 86963~|~1~|~2~|~02/S>2~|~Resurfacing of State Route 82 from SLM 0.00 to SLM 2.38 in the City of Aurora, Portage County, Ohio. 86963~|~1~|~1~|~01/NHS~|~Resurfacing of State Route 43 from SLM 20.72 to SLM 23.69 and SLM 25.78 to SLM 26.29, in the City of Aurora, Portage County, Ohio. 86963~|~2~|~5~|~05/S>2~|~Structure work on SFN# 6703259, POR-SR82-0.74 the branch of the Aurora Pond. 86963~|~1~|~3~|~03/NHS/AURO~|~100% City items along State Route 43 from SLM 20.72 to SLM 23.69 and SLM 25.78 to SLM 26.29, in the City of Aurora, Portage County, Ohio. 86963~|~1~|~4~|~04/S>2/AURO~|~100% City items along State Route 82 from SLM 0.00 to SLM 2.38 in the City of Aurora, Portage County, Ohio 114602~|~1~|~1~|~01/MPO~|~This split includes all work associated with construction the shared use path from MLK to Blair 110284~|~1~|~1~|~01/STR~|~Resurfacing SR 519 from SLM 6.78 to 7.44. 110284~|~1~|~2~|~02/NFA~|~Resurfacing SR 519 from SLM 7.44 to 11.08 (US 250). 110418~|~1~|~1~|~01/NHS~|~Resurfacing and other related work along SR 13 88687~|~1~|~3~|~03/STR~|~Remove and replace the wearing surface as well as expansion joint repair. 88687~|~1~|~2~|~02/STR~|~Br. MER-119-0252 - repair bridge by removing and replacing deck edge to reinstall bridge rail damaged by accident 88687~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete on MER-SR-119 0.00 to 8.54 MER-SR-118 24.75 to 27.09 MER-SR-118 21.99 to 23.77 107502~|~1~|~1~|~01/NHS~|~Resurfacing BEL-7 and JEF-7 85320~|~1~|~1~|~01/S>2~|~Construct new 0.76 mile three lane roadway connecting SR 123 and SR 63 on the west side of the City of Lebanon. The new alignment will be designated as SR 123 and existing SR 123 will be renamed. 105416~|~1~|~1~|~01/IMS~|~Bridge rehab/repair on Interstate bridges. 105416~|~1~|~2~|~02/NHS~|~Bridge repair/rehab on NHS bridge. 105416~|~1~|~3~|~03/STR~|~Bridge rehab - rural 120607~|~1~|~1~|~01/IMS~|~Replace Cleveland (SR 3) structure over IR 71 92751~|~1~|~1~|~01/STR~|~8602166 WIL SR107 5.66 Intersect: Eagle Creek 105727~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 119484~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing State Funds via the Fed/State Exchange Program at 80% up to CAP. 101623~|~1~|~1~|~01/ENH~|~Work funded with federal funds through the Transportation Alternatives Program. 95% federal funds using Toll Revenue Credit (TRC) with the 5% match proviced by Wyandot County. Funds needed over the cap will be provided by Wyandot County. 122743~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 93141~|~1~|~1~|~01/STR~|~District Preservation Paving Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on OFAH-Rural portion. 93141~|~1~|~2~|~02/S<2/COSH~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Urban Paving resurfacing with related work In the City of Coshocton on SR 83 93141~|~1~|~3~|~03/S5K~|~District Preservation Paving - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on OFAH-Urban portions of SR 83 110170~|~1~|~2~|~02/S<2~|~Jack and bore conduit - DAR-127-13.67 - CFN 1841200 110170~|~1~|~1~|~01/STR~|~Structural spray lining of conduit - DAR-121-12.80 CFN 1841197 107849~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-521-7.86-13.62 112857~|~1~|~1~|~01/S<2~|~FAY 22 from 6.26 to 7.25 and FAY 62 from 11.05 to 11.88 112857~|~1~|~2~|~02/STR~|~FAY 62 from 0 to 10.78 and FAY 435 from 0.00 to 0.97 117184~|~1~|~1~|~01/SAF~|~Primary plan split for all safety eligible items 115024~|~1~|~1~|~01/NFP~|~Resurface various Toledo Metropark locations 110013~|~1~|~2~|~02/S>2~|~plan split for the large urban section of WAR-123 110013~|~1~|~3~|~03/S5K~|~plan split for the small urban sections of WAR-122 and WAR-123 110013~|~1~|~1~|~01/STR~|~Work on the rural section of WAR-123 124873~|~1~|~1~|~01/SAF~|~Split for CEAO Safety funding 110727~|~1~|~1~|~01/STR~|~All work to resurface SR 199 in Wyandot County in the rural area. Work between the north boundary of the Upper Sandusky Urban Area at CR 47 at SLM 7.35 to 14.22. District Preservation Program funds. 110727~|~1~|~2~|~02/S5K~|~Work to resurface SR 199 inside of the Upper Sandusky Urban Area but outside of the City of Upper Sandusky. Beginning on the left side of the road where SR 199 leaves the City at 6.31 to 6.38, then on the right side from 6.37 to 6.60, then on both sides from where SR 199 leaves the City at 6.77 to 6.91. District Preservation Program funds. No local funds. 110727~|~1~|~3~|~03/S5K/USAN~|~Work to resurface SR 199 inside of the City of Upper Sandusky. Starting at the beginning of the project on both sides of the road from SLM 6.24 to 6.31, then on the right side of the road from 6.31 to 6.37, then on the left side of the road from 6.38 to 6.60, then on both sides of the road from 6.60 to 6.77, then on both sides of the road from 6.91 to 7.35. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Upper Sandusky. 110727~|~1~|~4~|~04/S5K~|~100% City Items - Work to resurface SR 199 inside of the City of Upper Sandusky. Starting at the beginning of the project on both sides of the road from SLM 6.24 to 6.31, then on the right side of the road from 6.31 to 6.37, then on the left side of the road from 6.38 to 6.60, then on both sides of the road from 6.60 to 6.77, then on both sides of the road from 6.91 to 7.35. 102207~|~1~|~1~|~01/NFA~|~LAW CR 6 6.89 ER Slide repair. 96531~|~1~|~1~|~01/IMS~|~Generic Plan Split for construction inspection for FY2019/2020 (B) 112850~|~1~|~1~|~01/S>2~|~PIC-674 from 8.96 to 10.93 & FRA-674-0.00-1.99 112850~|~1~|~3~|~03/S>2~|~Install reinforced soil slope along southbound SR 674 112850~|~1~|~2~|~02/STR~|~PIC-674 from 0 to 8.96 & FAI-674-0.00-0.40 116848~|~1~|~1~|~01/S>2~|~Resurfacing 108328~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. WAS 339 22.65. DSR WAS-012. Funded 100% federal. 77793~|~1~|~1~|~01/NHS~|~Replace Bridges GRE-4-0090 L/R, SFNs: 2900033 and 2900068that carry SR 4 over Union Rd including raising of SR 4 98863~|~1~|~1~|~01/NHS~|~Project involves the repair of two steel beams on bridge JEF22-0590 (SFN 4101804). The beams were damages as a result of underbridge hit and will be heat straightened. 87841~|~1~|~1~|~01/STR~|~ROS CR 207 0.00 - 7.44 Pavement ProjectIt is proposed to use CSTP funds to resurface 7.44 miles of CR 207 in Ross County with 2 inches of asphalt and 2 ft aggregate berm and pavement markings in FY15. CEAO funded 80/20 split w/Ross Co. as local match. 83652~|~1~|~2~|~02/STR~|~Culvert ReplacementOn SR772, 0.4 mile north east of it's intersection w/CR175 (Liberty Hill).01/STR/OT/State 83652~|~1~|~1~|~01/STR~|~Slide repairOn SR772, project begins 0.4 mile NE of it's intersection w/CR175 (Liberty Hill). 01/STR/OT/State 110594~|~1~|~1~|~01/BRO~|~All work to replace the bridge. Federal and state funds from the District Preservation Program budget. No local funds. 110594~|~1~|~2~|~02/BRO~|~Slip-Line on Term-Contract, non-let. May cancel this project and add to future D01-TCM-FY31 project 112892~|~1~|~1~|~01/NFP~|~City of Napoleon will improve and widen American Road from Industrial Ave to Oakwood, improve that intersection, improve and widen Oakwood Ave to Freedom Drive. 90647~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 100196~|~1~|~1~|~01/NHS~|~For all urban paving eligible items. 100196~|~1~|~2~|~02/NFP~|~For ineligible urban paving items 124459~|~1~|~1~|~01/IMS~|~Bridge deck replacement on WAS 77 0.30, SFN 8402949. 113533~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 103747~|~1~|~1~|~01/SAF~|~Add pedestrian signals with back plates and two road diets at high priority locations throughout the Akron Public School District 92566~|~1~|~1~|~01/STR~|~Replace retaining wall on SR 31 by Bokes Creek 91330~|~1~|~2~|~02/S<2~|~Urban func class area and rural pavingMAR-529: 0.46-2.8002/S<2/PV/F_ST 91330~|~1~|~3~|~03/STR~|~Rural func class area and rural pavingMAR-529: 2.80-9.2903/STR/PV/ 91330~|~1~|~1~|~01/S<2~|~Urban Func class area and urban paving in Marion CityMAR-529: 0.00-0.4601/S<2/PV/F_LC 103718~|~1~|~1~|~01/NHS~|~Intersection improvement. 121605~|~1~|~1~|~01/IMS~|~Pave culvert inverts. NOB 77 10.05 (1875675), NOB 77 10.57 (1875677) and NOB 77 14.27 (1875684). Interstate route funded 90 Federal/10 State. 104667~|~1~|~1~|~01/IMS~|~Work of the reconstruction and capacity addition on IR 75. 104667~|~1~|~4~|~04/IMS~|~Betterment for the sewer district CSO21 104667~|~1~|~5~|~05/IMS~|~Construct access road. 104667~|~1~|~3~|~03/IMS~|~Bridge rehab 104667~|~1~|~2~|~02/IMS~|~Work for the reconstruction of IR 75 - no added capacity. 104667~|~1~|~6~|~06/IMS~|~Change Order over contract limits. 104667~|~1~|~8~|~08/IMS~|~The proposed work is currently part of the scope of the 5B construction phase. However, in order to decrease the impact to the travelling public, this 360-foot section of Interstate 74 will be added to Phase 5A. During the October PIAC meeting, the committee expressed a preference for reducing the impact to the travelling public. 104667~|~1~|~7~|~07/IMS~|~Purchase of MOT materials due to slide on project. This split also includes a retroactive change order for fuel price adjustment. 92666~|~1~|~1~|~01/MPO~|~Resurfacing CR 709 0.00 - 1.14 92495~|~1~|~1~|~01/SAE~|~"01/SAE/OT/ " - Safety Program 4HJ7(100% Federal) - CAP at $1,100,000.00 for Construction Phase- Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) Cos-US 36-20.70; 2) Fai-SR 37-11.46; 3) Fai-SR 204-00.81; 4) Gue-SR 209-11.73; 5) Gue-SR 209-12.18; 6) Mus-US 40-6.98; 7) Mus-US 40-9.20; 8) Mus-SR 60-14.61; 9) Mus-SR 60-21.57; 10) Mus-SR 146-10.70; 11) Lic-SR 79-6.20; 119995~|~1~|~1~|~01/NFA~|~Plan Split for Federal Lands Access Program (FLAP) funding 110495~|~1~|~1~|~01/SAF~|~Safety Funded Plan Split 110495~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 101648~|~1~|~1~|~01/STR~|~Culvert Replacements: ASD-58-5.60 and ASD-58-7.75 123333~|~1~|~1~|~01/SAF~|~Replace and add new sidewalks and SUPs in various locations in the City of Delaware. 95868~|~1~|~1~|~01/NFP~|~@ SLM 11.05 117978~|~1~|~1~|~01/BRF~|~Bridge replacement 93953~|~1~|~1~|~01/IMS~|~Construct a new noise wall along the west side of Interstate 75 just south of the U.S. 40 interchange. 112946~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 102435~|~1~|~1~|~01/NFP~|~Plan split for bridge slab replacement 121997~|~1~|~1~|~01/SAF~|~Improve the intersection of US42, Elsinore Pl and I-71 ramps. 121997~|~1~|~2~|~02/IMS~|~Replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71 and bridge HAM-42-0235R which carries US 42 Northbound over I-71 Southbound, and bridge HAM-71-0822R that carries a ramp from Rdige Rd to Southbound I-71 over Northbound I-71. 108708~|~1~|~1~|~01/NFA~|~The COUNTY will improve 0.23 miles of SR 287 by resurfacing and widening to accommodate new turn lanes into a proposed driveway at the entrance into the commercial facility. 119843~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 82956~|~1~|~1~|~01/NHS~|~Replace existing three span bridge over hike/bike trail with pre-cast structure (sfn# 7707231), SUM-SR91-11.96, in the City of Stow, Summit County, Ohio. 82956~|~1~|~3~|~03/NHS~|~Ongoing Engineering associated with Plan Split #1 portion of project. 82956~|~1~|~2~|~02/NHS/HUDS~|~Milling and resurfacing of SR-91 and Norton Road intersection (SLM 12.05 to SLM 12.30), including curbs and drainage improvements. Sidewalk upgrade. Evaluating turn lane lengths. Evaluate signal improvements. (Actually paid by the City of Stow couldn't change plan split code in time). 82839~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay. MRG 284 0.00-4.05. 100% state funded. 111641~|~1~|~1~|~01/IMS~|~Rehabilitate structure FRA-670-031 over the Scioto River, US 33T and CSX railroad 111641~|~1~|~2~|~02/IMS~|~Rehabilitate structures carrying 670 over 70WB & McKinley Ave. 111641~|~1~|~3~|~03/IMS~|~Plan split for items associated with paving on the interstate (FRA-670-0.00-0.87) 110744~|~1~|~1~|~01/NFP~|~Landslide repair 118400~|~1~|~1~|~01/SAE~|~Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. 122498~|~1~|~1~|~01/STR~|~Slide repairs. 110862~|~1~|~1~|~01/SAF/FCEO~|~Improvement of four intersections by adding turn lanes and rebuilding signals along Refugee Road. 120301~|~1~|~1~|~01/S>2~|~Pedestrian Hybrid Beason improvement on Muirfield Drive 120403~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established 115771~|~1~|~1~|~01/BRO~|~Bridge replacement. 99621~|~1~|~1~|~01/IMS~|~Rehabilitate bridge TUS 77 1670 (SFN 7902557) by replacing deck and painting structural steel 116612~|~1~|~1~|~01/STR~|~FY2026 116612~|~1~|~2~|~02/STR~|~Inspection in FY27 108882~|~1~|~1~|~01/NFP~|~The PORT AUTHORITY will construct approximately 3,800 feet in total of JeRu Park Drive, JeRu North and JeRu West 124837~|~1~|~1~|~01/STR/MACE~|~Resurfacing. 95820~|~1~|~2~|~02/NFP~|~Urban paving ineligible items. 95820~|~1~|~1~|~01/NHS~|~Urban Paving eligible items 100244~|~1~|~1~|~01/SAF~|~Provide tyregrip or micro surface treatments on various routes throughout the district that have wet fixed object crash trends. On HAM-562 EB, add slotted drain to fix drainage issues. 92675~|~1~|~1~|~01/MPO~|~Resurfacing CR 34 9.83 - 10.41 98501~|~1~|~1~|~01/STR~|~Resurfacing: WAY-301-3.84-7.79 / WAY-539-8.59-12.74 98501~|~1~|~2~|~02/STR~|~Bridge Work on structure WAY-301-0389. 109774~|~1~|~1~|~01/S5K~|~Resurfacing with asphalt concrete 109774~|~1~|~2~|~02/STR~|~Resurface with asphalt concrete 109774~|~1~|~3~|~03/S5K~|~Reconstruction 120539~|~1~|~1~|~01/SAF~|~Improve the intersection of DEL/LIC SR 37and DEL CR 51 (County Line Rd) 96496~|~1~|~2~|~02/SAF~|~replacement of Type A anchor assemblies on various NHS routes. 96496~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement contract for FY 2018. Various routes and sections in D10. Funded 80 federal/20 state. 84292~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - Capped at $1,820,507.00 - For the relocation and associated work to enhance clearance of MUS SR60 6.72-6.92 from the cut rock face. 25436~|~1~|~1~|~01/IMS~|~District Preservation Pavement Program - No CAP - Resurfacing on portions of IR 70 in Licking and Fairfield Counties 25436~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - No CAP - Repairs on IR 70 Bridges 108892~|~1~|~1~|~01/IMS~|~Upgrade DMS signs and supports at various locations 95571~|~1~|~1~|~01/NFA~|~Jobs and Commerce ED fund to aid the City's bridge construction 101120~|~1~|~1~|~01/S>2~|~AC overlay without repairs on:CLA-72 SLM 11.86 to 13.50 112832~|~1~|~1~|~01/STR~|~Resurfacing SR 9 105687~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funded using SAC 4PS7. 110943~|~1~|~3~|~03/S>2~|~Plan Split for TLCI work items 110943~|~1~|~2~|~02/S>2~|~Split for urban paving work in Fairview Park 110943~|~1~|~1~|~01/S>2~|~Split 1 for urban paving work in Rocky River 110943~|~1~|~4~|~04/CMQ~|~Work for CMAQ award to Rocky River 110943~|~1~|~5~|~05/NFP~|~Plan split for non-eligible work at 100% cost to the City of Rocky River. 110943~|~1~|~6~|~06/NFP~|~Plan split for non-eligible work at 100% cost to the City of Fairview Park. 98072~|~1~|~1~|~01/MPO~|~6' culvert replacement 107936~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 2.84-2.88. DSR MOE-002. Funded 100% federal. 107936~|~1~|~2~|~02/STR~|~DSR MOE-003. Maintenance of Traffic, Signals. 101970~|~1~|~1~|~01/NFP~|~Noise wall construction using 100% state funds SAC 4NW7 from Central Office. 123040~|~1~|~1~|~01/IMS~|~Generic block PID. 102363~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code. 100773~|~1~|~1~|~01/IMS~|~FRA County crack sealing on various routes 123416~|~1~|~1~|~01/STR~|~Resurfacing SR 43 94115~|~1~|~2~|~02/NHS/AKRO~|~100% City Items. 94115~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing of SR 91 from SLM 1.81 to 3.89, urban paving 80/20 in the City of Akron. 113579~|~1~|~2~|~02/IMS~|~The addition of a fourth lane in each direction as a result of MOT operations.WAR-75-SLM 11.56 to 12.20MOT-75-SLM 0.00 to 3.00 113579~|~1~|~1~|~01/IMS~|~Major reconstruction of mainline Interstate 75. Rebuild the existing pavement full depth. 123907~|~1~|~1~|~01/NHS~|~Conduit rehab. 121574~|~1~|~1~|~01/S5K~|~Plan split for federally eligible pavement resurfacing 99498~|~1~|~1~|~01/SAF/FCEO~|~Fairfield County CEAO Highway Safety Improvement Program Funding - 4HB7 (100% Federal) - See CAP Comments - Replacement of guardrail on CR 154 at 00.65 to 00.75 and on SFN 2330601 over the Hocking River. 110012~|~1~|~1~|~01/NFP~|~RPM 117725~|~1~|~1~|~01/STR/STCE~|~Bridge rehabilitation. 105783~|~1~|~1~|~01/NFA~|~The City of Lancaster will rehabilitate 5,640 feet of S Ewing St. which will include pavement repairs, asphalt surfacing, drainage improvements, shoulder widening, ADA upgrades, pavement markings, and other ancillary items. 101905~|~1~|~1~|~01/NFP~|~Noise wall repair and retrofit along DEL IR 71, DEL US 42, FRA IR 71, and FRA IR 270 114841~|~1~|~1~|~01/STR~|~UNI-SR347-0.00-4.23 108636~|~1~|~1~|~01/IMS~|~Culvert Reline. 112934~|~1~|~1~|~01/NHS~|~NHS Plan Split 112934~|~1~|~2~|~02/S>2~|~Columbus urban paving plan split. 112934~|~1~|~3~|~03/S50~|~Groveport urban paving plan split. 102854~|~1~|~1~|~01/NHS~|~D09 Bridge Maintenance FY22 101003~|~1~|~1~|~01/SAF~|~This is for the roundabout. 101003~|~1~|~2~|~02/SAF~|~Guardrail replacement on SR-199 bridge over I-75. 97028~|~1~|~1~|~01/STR~|~Spot paving at various locations in District 11. 94208~|~1~|~1~|~01/STR~|~Project to replace small culverts CLI-133-0469, GRE-343-0065, and PRE-127-0917. Pave invert for small culvert GRE-42-1310. 103133~|~1~|~1~|~01/STR~|~Plan Split 01 created for Construction Engineering in FY22 103133~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY23 Construction Services 109659~|~1~|~1~|~01/IMS~|~Replace deck and superstructure (existing width) on the Courtright Rd over IR 70 bridge. Work includes necessary appurtenances such as roadway and drainage items. 109659~|~1~|~2~|~02/S>2~|~Items associated with the widening of deck & superstructure of Courtright Rd to accommodate pedestrians. Work includes the addition of sidewalk from Groves Rd to Deshler Ave. This work also includes necessary intersection modification to accommodate pedestrians. 85068~|~1~|~1~|~01/BRF~|~bridge replacement 92511~|~1~|~1~|~01/BRF~|~Structurally deficient and functionally obsolete bridge to be rehabilitate with associated roadway approach work SFN 5452597 MER CR 218 3.37 CR 21 B 3.43 SLM to 3.57 SLM 99868~|~1~|~1~|~01/IMS~|~Install traffic signal at intersection of Fair Road and IR 75 NB ramps to improve operation. 101414~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay to POR SR 82 from 9.13 to 10.64 101414~|~1~|~2~|~02/S<2~|~Fine graded polymer AC overlay to POR SR 305 from 0.00 to 0.48. 121708~|~1~|~1~|~01/SAF~|~Traffic Signals - Maintenance 121708~|~1~|~2~|~02/SAF~|~Traffic Signals - Capital 109420~|~1~|~1~|~01/NFA~|~Barklow Rd at SR-335 must be extended 2,500 LF north to county property; road will be two 12-ft. lanes with drainage and 60 ft width dedicated RW. 121149~|~1~|~1~|~01/STR~|~All Work is within this Split 113836~|~1~|~1~|~01/NFP~|~Created for TID involvement 121290~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing. 96327~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation Bridge Program 4PS7 (100% State) - No CAP ? Bridge Replacement: 1) SFN 6005349, MUS-SR 208-03.18 Not BR Eligible for Rehabilitation: Length=15; SD/FO = (0); SR = 86.8; DSR = 7; 2) SFN 6005373, MUS-SR 208-04.99 Not BR Eligible for Rehabilitation: Length=12; SD/FO = (0); SR = 67.1; DSR = 6; 3) SFN 6005403, MUS-SR 208-05.32 Not BR Eligible for Rehabilitation: Length=16; SD/FO = (0); SR = 79.2; DSR = 7 112663~|~1~|~1~|~01/IMS~|~Slide repair west of SR-91 109761~|~1~|~1~|~01/NHS~|~AC Overlay without repairs 109761~|~1~|~2~|~02/S5K~|~Resurfacing 109761~|~1~|~3~|~03/STR~|~Resurfacing 102739~|~1~|~1~|~01/STR~|~Bridge Replacement: RIC-603-13.57 (SFN 7007213) 104970~|~1~|~1~|~01/IMS~|~Plan Split for Bridges FRA-70-0.80 and FRA-70-1.41 104008~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. PRE-TR 453-0195 (SFN: 6833861) including replacement of the existing abutments and repairs to the superstructure and deck. 112478~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 4131886, utilizing 100% federal funds (up to max of $604,000) 124889~|~1~|~1~|~01/S50/GRAN~|~ Resurfacing and related work of multiuse path along (CR 539) Newark Granville Road in the Village of Granville. 124945~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing STP Urban roadway, 0.000 to 0.249, utilizing pavement preservation funding. 124945~|~1~|~2~|~02/STR~|~Plan Split for resurfacing STP Rural, 0.249 to 2.735, utilizing pavement preservation funding. 90671~|~1~|~1~|~01/BRF~|~Replacement of two structures. SFN# 7661215, CR-240-6.41 over Waterworks Creek and SFN# 7631324, CR-240-6.47 over the West Branch Nimishillen Creek, in the City of Canton, Stark County, Ohio. 90671~|~1~|~2~|~02/CMQ~|~See linked structures. 90671~|~1~|~3~|~03/ENH~|~See linked structures. 119178~|~1~|~1~|~01/IMS~|~Plan split for RPMs 115614~|~1~|~1~|~01/NFP~|~Created for J&C involvement 83841~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay. NOB 77 11.07-18.92. Interstate route funded 90 federal/10 state. 98306~|~1~|~1~|~01/MPO~|~Mill & fill Oberlin-Elyria Road (CR 231) from SR 511 to Butternut Ridge Road. 114872~|~1~|~1~|~01/SAF~|~Turn lanes, pedestrian improvements and RR signal pre-emption at Sycamore Street in Columbus Grove. Safety program funds will be used first and District Preservation Program funds. 82262~|~1~|~2~|~02/S<2~|~STP<200,000 - District AllocationLOR SR 10C 0.73 - 0.77 82262~|~1~|~1~|~01/NHS~|~NHS - District AllocationLOR US 20 8.56 - 16.25LOR SR 10 6.52 - 6.62 113676~|~1~|~1~|~01/NFP~|~Eligible work to repair and resurface Park Pavements. 113676~|~1~|~2~|~02/NFP~|~Split for non-eligible work. 95976~|~1~|~1~|~01/NFP~|~New 60' x 150' fabric salt building at 6000 tons. 95976~|~1~|~2~|~02/NFP~|~Loader Building. 122236~|~1~|~1~|~01/NHS~|~Resurfacing of SR 16 in the city of Newark and related bridge work. 115610~|~1~|~1~|~01/IMS~|~Mowing 123886~|~1~|~1~|~01/ENH~|~Construct sidewalks and corresponding facilities (80% Federal CRP funds & 20% Federal Safety funds). 91190~|~1~|~2~|~02/S<2~|~FY2015 Urban Paving for the City of Eaton on US127 through the City of Eaton. The limits are SLM 12.04 - 14.75 - US127 inside the City. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 91190~|~1~|~1~|~01/S<2~|~FY2015 Urban Paving for the City of Eaton on US127 through the City of Eaton. The limits are SLM 12.04 - 14.75 - US127 inside the City. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 107210~|~1~|~1~|~01/ENH~|~Rehabilitation of Mill Creek Park bridge. 103979~|~1~|~1~|~01/NFA~|~The City will construct a new public road starting at Center Ridge Road and moving southerly approximately 700' before ultimately ending up in a cul-de-sac. 88515~|~1~|~2~|~02/STR~|~Pavement planing and resurfacing of the existing roadway and other roadway related items, drainage/catchbasin, ditch work and fence on DAR US 127 15.89 to 16.56 segment length 0.67 total lane miles 2.50 DAR US 127 9.57 to 9.69 segment length 0.12 total lane miles 0.48 DAR US 36 9.61 to 11.50 segment length 1.89 Total Lane Miles 7.56 88515~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing of the existing roadway and other roadway related items. Drainage/catchbasin, ditch work and fence on DAR-US-127 13.16 to 14.98 segment length 1.82 total lane miles 7.28 DAR US 127 14.98 to 15.89 segment length 0.91 total lane miles 3.64 DAR-US-36 11.50 to 13.08 segment length 1.58 total lane mile 6.10 102028~|~1~|~1~|~01/SAF~|~Section Improvement - Additional turn lanes at Windfall, SR94 and Medina Line Rd intersections. Signal Reconstruction at six signalized intersections and all signals interconnected. 102028~|~1~|~2~|~02/NHS~|~Resurfacing Full Width 102028~|~1~|~4~|~04/SAF~|~SR18 Only - Split 4/1 is additional cost for permanent wet reflective optics (100% 4HJ7 / $1250 per mile) and grooving (100% 4HJ7 / $5280 per mile) and split 4/2 to cover the remaining costs (4PF7/4PS7). 102028~|~1~|~3~|~03/SAF~|~Safety funded centerline rumble stripes. 102028~|~1~|~5~|~05/SAF~|~Medina County Sanitary Engineer Water Work Items 102028~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 101774~|~1~|~1~|~01/NHS~|~Slide repair and Culvert replacement on BRO 125 (7.00-7.60). 114004~|~1~|~1~|~01/NFA/PCEO~|~"01/NFA/PV/PCEO" - 80% Federal (4B77) and 20% Local (4BG7) - resurfacing and related work on CR 22. 106161~|~1~|~1~|~01/NHS~|~Plan Split 106161~|~1~|~2~|~02/NHS~|~Plans split 2 for 100% Lcl items and paving over fed. funding max. 108164~|~1~|~1~|~01/ERD/AKRO~|~Reconstruction of deteriorated pavement and sidewalk, upgrade of traffic signals, cycle track and landscaping. 116859~|~1~|~1~|~01/S>2~|~Resurfacing 93654~|~1~|~2~|~02/SAF~|~Corridor upgrade - replace sidewalk, curb and drainage. Consolidate drives and widen for bike lanes. On south Richland Avenue from Canterbury Drive to Dairy Lane. City items funded 100% local. 93654~|~1~|~1~|~01/SAF~|~Corridor upgrade - replace sidewalk, curb and drainage. Consolidate drives and widen for bike lanes. On south Richland Avenue from Canterbury Drive to Dairy Lane. Fund event 1 - 90% Federal Safety/10% State Safety; 2 - 80% Federal/20% Local; 3 - 80% Federal/20% Local; 4 - 100% local over the cap (if needed). 76439~|~1~|~1~|~01/SAF~|~Plan Split for STA SR 800 7.05 to 8.08 96305~|~1~|~1~|~01/NHS~|~80/20 ODOT/Local Worthington Urban Paving NHS 96305~|~1~|~2~|~02/NHS~|~Work on structure 2508958 103647~|~1~|~1~|~01/NHS~|~Main Plan Split 103647~|~1~|~2~|~02/IMS~|~LUC-475-9.54 to 10.27 and LUC-475-12.82 to 13.34 104112~|~1~|~1~|~01/NFP~|~Construction of noise on West side of Interstate 271 just North of State Route 82 in the City of Macedonia, Summit County, Ohio. 116770~|~1~|~1~|~01/IMS~|~Resurfacing. 114589~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 5.26. Work includes dig out and replace. 124693~|~1~|~1~|~01/BRO~|~Single Span box beam super replacement. 96474~|~1~|~1~|~01/BRO~|~BR Eligible. Marion-Williamsport over US 23 (5100925) 100% State 103692~|~1~|~1~|~01/SAE~|~Apply edgeline and centerline pavement markings on various county roads in Clinton County. 87137~|~1~|~2~|~02/S<2~|~02/S<2/PV/ This split is for resurfacing work that is inside the Kenton Urban Area and inside the City of Kenton. The City of Kenton is responsible for paying the 20% non-federal match for work covered by this split. 87137~|~1~|~3~|~03/S<2~|~03/S<2/PV/ This split is for resurfacing work that in outside the City of Kenton but inside the Kenton Urban Area. There are no funds from the City of Kenton in this split. All funds are from the District Preservation Program Budget. Work on SR 309 outside the City of Kenton up to 17.93 is covered by this split. 87137~|~1~|~1~|~01/STR~|~01/STR/PV/ This split is for resurfacing work outside of the Kenton Urban Area. The Kenton Urban Boundary is at 17.93 on SR 309. This split is for work on SR 309 starting at that point. 116293~|~1~|~1~|~01/STR~|~Overlay project. 98340~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - District Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail Upgrade at: 1) Fai US 22 11.96 to 13.16; 2) Fai SR 37 10.40 to 14.19; 3) Lic US 40 00.00 to 05.27; 4) Lic SR 13 13.98 to 17.51; 5) Lic SR 16 07.55 to 14.10; 98340~|~1~|~2~|~02/STR~|~"02/STR/OT/ " District Preservation Funding 4PF7 (80% Federal) /4PS7 (20% State) - No Cap - Guardrail upgrade at: 1) Per SR 13 13.68 to 17.47 2) Per SR 37 15.05 to 20.17 98208~|~1~|~3~|~03/IMS~|~Lands & Buildings Funds - LBP7 (100% State) - CAP (See CAP Comment) - Restoration of pavement markings on LIC -70 EB (Park 17) and WB (Park 18) Rest Areas and GUE-IR 70. EB & WB Weigh Stations. 98208~|~1~|~1~|~01/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Epoxy Pavement Markings on Interstate Routes in District 5: GUE-70-(16.30 to 16.60); LIC-70-(9.01 to 9.46); LIC-70-(16.73 to 17.30); 98208~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Epoxy Pavement Markings on NHS routes in District 5: FAI-33-(8.77 to 8.97), FAI-33-(12.53 to 13.00), FAI-33-(14.86 to 15.25), FAI-33-(20.43 to 20.75), LIC-16-(23.61 to 23.86); MUS-16-(0.98 to 1.48), NUS-16-(5.68 to 6.35), MUS-16-(9.99 to 10.54) 114644~|~1~|~1~|~01/S<2~|~Resurfacing-Microsurfacing 103121~|~1~|~1~|~01/NFP~|~Maintenance (4CP7): Replace Signal UPS Batteries 120117~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 122092~|~1~|~1~|~01/IMS~|~Plan Split for work associated with installation of VSL signage and appurtenances. 93347~|~1~|~2~|~02/BRF~|~BRO 763 0.63 (SFN 0803847). Bridge Eligible for federal money due to G.A. 93347~|~1~|~3~|~03/NFA~|~BRO 763 (0.92-1.12) 93347~|~1~|~1~|~01/NFA~|~BRO SR763 Brdg Replace/Realign BRO SR 763 0.92 - 1.12 Brdg Replace/RealignOn SR763, 1.01 miles north of SR41, it is proposed to replace the bridge and realign the roadway & add a retaining wall. 100% state 01/NFA/BR/State 112472~|~1~|~1~|~01/MPO~|~Split for MPO-funded paving work 96517~|~1~|~1~|~01/IMS~|~Resurface SUM IR 77 from 1.40 to 4.00 96517~|~1~|~2~|~02/IMS~|~Minor bridge work to SFN 7702132 & SFN 7702167 SUM IR 77 1.57 L&R over Greensburg Road, SFN 7702221 SUM IR 77 2.84 under Wise Road, SFN 7702256 SUM IR 77 3.77 under Graybill Road. 113556~|~1~|~1~|~01/BRF~|~100% Federal Participation on the bridge replacement SFN 1860015 using OBPP funds and TRC. 119666~|~1~|~1~|~01/NFP~|~Culvert Replacement. 104270~|~1~|~1~|~01/NFP~|~Maintenance contract of traffic signals and highway lighting. 93750~|~1~|~1~|~01/SAE~|~100% federal safety funds from Central Office Safety Program. SAC 4HJ7. 120398~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established 114352~|~1~|~1~|~01/SAF~|~Safety improvements on CR 335 (Spangler Road) from Restoration Park Drive to Main Street and on CR 303 (Medway-New Carlisle Road) from Main Street to US 40. 114352~|~1~|~2~|~02/CMQ~|~Add northbound right-turn lane at Union Road and northbound left-turn lane at Lower Valley Pike 119682~|~1~|~1~|~01/MPO~|~Resurfacing of W. Main Street from Orange Street to Church Street. 121130~|~1~|~1~|~01/STR~|~Resurfacing US 62 87090~|~1~|~5~|~05/STR~|~Small culvert replacements for BUT-73-0259, and 0263, and BUT-177-0402, 0403, 0409, 0409A, 0486, 0561, 0570, 0966, and 0974. 87090~|~1~|~2~|~02/S>2~|~Pavement work on large urban route 87090~|~1~|~3~|~03/S<2~|~Pavement work on small urban route. 87090~|~1~|~6~|~06/S>2~|~Culvert work on large urban route. 87090~|~1~|~1~|~01/STR~|~Resurfacing a portions of SR 73 and SR 177 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. The limits are SR 73: 1.55-4.07 and SR 177: 3.71-10.15 87090~|~1~|~4~|~04/NHS~|~This plan split is for the NHS portion of SR 73 between SLM 1.47-1.55 or 0.08 miles of roadway. Resurfacing a portion of SR 73 Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 87090~|~1~|~7~|~07/S>2~|~Water line work to by covered 100% by Southwest Regional Water District. 96476~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2019. Various routes and sections in D10. Non federal aid project funded 100% state. 86797~|~1~|~1~|~01/SAF~|~Safety - Add two way left turn lane from end of left turn lane at Crest to Cranbrook, two way left turn lane will become left turn lane at Cranbrook. 86797~|~2~|~2~|~02/SAF~|~Greater Cincinnati Water Work portion of Safety Project 96233~|~1~|~3~|~03/S>2~|~STP>2 Urban. SLM 15.99-16.84 Columbus 96233~|~1~|~2~|~02/NHS~|~NHS Urban. SLM 7.60-10.46; 12.36-15.99; 16.84-17.57 Columbus 96233~|~1~|~1~|~01/NHS~|~NHS General. SLM 7.04 to 7.60 85059~|~1~|~1~|~01/BRF~|~bridge replacement 114801~|~1~|~1~|~01/SAE~|~Multilane roundabout(s) project on FRA-CR125 (Frank Road) at Brown Road/Hardy Parkway Local sponsor - Franklin County Engineer 113810~|~1~|~1~|~01/STR~|~Resurfacing. 113810~|~1~|~4~|~04/STR~|~Bridge preventive maintenance. 113810~|~1~|~2~|~02/STR~|~Minor bridge work 10' to 20' and culvert replacement. 113810~|~1~|~3~|~03/STR~|~Bridge replacement 10' to 20' structure. 108742~|~1~|~3~|~03/SAF~|~Widening of Western Reserve Road to include a two way left turn lane and right turn lanes at three locations. 108742~|~1~|~1~|~01/CMQ~|~Widening of Western Reserve Road between State Route 7 and South Avenue. 108742~|~1~|~2~|~02/MPO~|~Widening of Western Reserve Rd from Market St to South Ave. 111617~|~1~|~1~|~01/NFP~|~Guardrail replacements and upgrades on various routes throughout District 4. 117468~|~1~|~1~|~01/S>2/SUCE~|~Superstructure replacement. 107654~|~1~|~1~|~01/IMS~|~Fix damaged parapet railing from truck accident on 02/06/18. 97461~|~1~|~1~|~01/NFP~|~This the district's annual long line pavement marking project. 107127~|~1~|~1~|~01/S>2~|~Urban Paving - City of Loveland - Oakland Dr. to Warren Co. 107127~|~1~|~2~|~02/S>2/LOV~|~Items to be covered 100% by the City of Loveland 110161~|~1~|~1~|~01/NHS~|~Culvert repair and replacement project. WAS 7 12.81 (1880523). NHS route funded 80 federal/20 state. 110161~|~1~|~2~|~02/IMS~|~Culvert repair and replacement project. WAS 77 0.61 (1804979), WAS 77 4.11 (1805012). Interstate route funded 90 federal/10 state. 110161~|~1~|~3~|~03/STR~|~Culvert repair and replacement project. WAS 339 5.67 (1887482), WAS 339 9.77 (1885824), WAS 339 17.52 (1809793). Rural other federal aid funded 80 federal/20 state. 110161~|~1~|~4~|~04/NFA~|~Culvert repair and replacement project. WAS 260 8.25 (1810378). Not on the federal aid system funded 100% state. 91713~|~1~|~1~|~01/S<2~|~Resurfacing project using an asphalt overlay treatment. GAL 160 0.00-3.06. Urban other federal aid funded Federal 80% and State 20%. 101706~|~1~|~1~|~01/NFA~|~Rehabilitation of the Foraker Covered Bridge on MOE CR 40 0.99, SFN 5633230. Bridge has developed a sag which affects the structural stability of the truss bridge. Funded 80 federal/20 local. 83936~|~1~|~1~|~01/S<2~|~Resurface the existing roadway along with other roadway related items on State Route 366 in Russells Point from the junction of State Route 235 (SLM 2.98) to the junction of Township Road 94 (SLM 6.03). 122167~|~1~|~1~|~01/ENH~|~Construct a 10' wide asphalt shared use path along the south side of E. Ohio St. and west side of Kingston Pike. 93575~|~1~|~1~|~01/SAE/NEWA~|~"01/SAE/OT/NEWA" City of Newark SRTS Project - Bridge and connecting path at Legend/Wilson Elementay School. Total project funding cap utilizing SRTS 4SC7 of $500,000 minus PE/ROW Encumbrances of $125,996.88 equals $374,003.12 available for construction CAP. 102745~|~1~|~4~|~04/NHS~|~Minor bridge work > 20' span. 102745~|~1~|~5~|~05/NHS~|~Minor bridge rehab > 10' to 20' span. 102745~|~1~|~3~|~03/ENH/STOW~|~Installing/upgrading sidewalks and ADA curb ramps and other pedestrian facilities. 102745~|~1~|~2~|~02/CMQ/STOW~|~Signal replacements/upgrades. 102745~|~1~|~1~|~01/MPO/STOW~|~Pavement reconstruction. 102745~|~1~|~6~|~06/NHS/STOW~|~Lighting improvements. 114547~|~1~|~1~|~01/NHS~|~Mine/slide repair by ditch and culvert cleanout 93548~|~1~|~1~|~01/IMS~|~Construct a Type II noise barrier along the Southbound side of Interstate 75 between Cincinnati/Miami Chapel Road and Stewart Street. MOT 75 11.09 to 11.22. 93548~|~1~|~2~|~02/IMS~|~Repair of noise wall at CLA IR 70 0.00, MOT IR 70 17.90, MOT IR 75 16.70, and MOT IR 675 3.00. 81102~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 724 0231 (SFN 6105106) and 0122 (SFN 6105041). Funded 80 federal/20 state. 81102~|~1~|~2~|~02/BRF~|~Bridge replacement project. NOB 724 0264 (SFN 6105130). BR eligible funded 80 federal/20 state. 81102~|~1~|~3~|~03/BRF~|~Bridge deck replacement project. NOB 724 0044 (SFN 6104983). BR eligible funded 80 federal/20 state. 123991~|~1~|~1~|~01/SAF~|~Guardrail replacement project on HOC CR 17 0.00-4.91 and HOC CR 82 0.00-3.374. 92543~|~1~|~3~|~03/NHS/tall~|~100% City of Tallmadge items. 92543~|~1~|~1~|~01/NFP~|~Spot paving in Portage, Stark and Summit Counties 92543~|~1~|~2~|~02/NHS/Tall~|~Resurfacing of State Route 91 from slm 6.02 to slm 7.05, in the City of Tallmadge, Summit County, Ohio. 114683~|~1~|~1~|~01/S<2~|~Resurfacing-Chip Seal 96999~|~1~|~1~|~01/NHS~|~Building Demolition 102753~|~1~|~1~|~01/IMS~|~This plan split is for Bridge rehab on the Interstate Route. 93038~|~1~|~2~|~02/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1)Mus-SR 146- 25.78 to 33.76 93038~|~1~|~1~|~01/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 313-00.00 to 01.24; 2) Gue-SR 285-09.47 to 13.46; 3) Gue-SR 340-0.00 to 00.86; 4) Gue-SR 672-00.00 to 02.74; 5)Mus-SR 313-00.00 to 07.13; 6)Mus-SR 340- 00.00 to 3.64 88328~|~1~|~1~|~01/ENH~|~Interchange Gateway which will add city logos on an undulating concrete wall that "wave" in both horizontal and vertical directions to represent the strong influence of water on the community on Interstate 75 at Exit 47 MOT IR 75 SLM 6.43 to 6.96. 106375~|~1~|~1~|~01/STR~|~Remove and replace culverts on rural routes in Montgomery County. 113171~|~1~|~1~|~01/MPO~|~Resurfacing of Tallmadge Rd from SR 44 to SR 14. 114867~|~1~|~1~|~01/STR~|~Chip seal. 114867~|~1~|~2~|~02/NFP~|~ODNR project to resurface roads R-5, R-4, R-2, R-3, F-3, F-2, F-4 in Strouds Run State Park and roads in Burr Oak State Park. 100743~|~1~|~1~|~01/NFP~|~RPM's on various routes 120778~|~1~|~1~|~01/STR~|~STP Rural bridge repairs 120778~|~1~|~2~|~02/NHS~|~NHS bridge repairs 120778~|~1~|~3~|~03/NHS~|~NHS culvert repair 117346~|~1~|~1~|~01/NFA~|~Bridge Replacement 80501~|~1~|~1~|~01/STR~|~The split is for work funded with federal rural STP funds with a 20% state match. All funds are from the District Preservation Program budget. There are no local funds in this split. The entire project uses this split. 123690~|~1~|~1~|~01/MPO/STCE~|~Resurfacing. 89005~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill 113043~|~1~|~1~|~01/STR~|~All work in this split. 118620~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV - 90% 4PF7, 10% 4PS7 105264~|~1~|~1~|~01/S<2~|~Smooth seal on small urban route:MER US 127 SLM 10.62 to 12.62MER US 127 SLM 14.68 to 14.93 105264~|~1~|~2~|~02/STR~|~Smooth seal on rural route:MER US 127 SLM 8.83 to 10.62MER US 127 SLM 14.93 to 21.11 100958~|~1~|~1~|~01/NHS~|~STA US 30 from 16.46 to 18.35 STA SR 43 from 9.03 to 10.74STA SR 172 from 16.58 to 17.61 100559~|~1~|~1~|~01/S>2~|~Plan Split for sections within the large urbanized areas. These sections are WAR-74 between SLM 7.08 - 8.07 and SLM 13.78 - 13.82 100559~|~1~|~2~|~02/STR~|~Plan Split for the rural portions of SR 741. These limits are SLM 8.07 - 10.43 and SLM 11.02 - 13.78 100559~|~1~|~3~|~03/S<2~|~Plan Split for the section of WAR-71 considered to be in the Middletown urbanized Area. These limits are SLM 10.43 - 11.02 117481~|~1~|~1~|~01/NFP~|~ODNR project for gravel road resurfacing and culvert maintenance at ATH Wallace O'Dowd WLA. 100564~|~1~|~1~|~01/NHS~|~Microsurfacing JEF-22 from the HAS Co. Line to SLM 3.86. 95794~|~1~|~1~|~01/STR~|~from SLM 0.00 to SLM 5.08 93112~|~1~|~4~|~04/NHS~|~Bridge workSFN:4703421 LOR-58-22.88 93112~|~1~|~2~|~02/NHS~|~District Allocation 93112~|~1~|~3~|~03/NHS~|~Urban paving - 80/20 - District Allocation/City of Amherst 93112~|~1~|~1~|~01/NHS~|~100% City of Amherst 124337~|~1~|~1~|~01/NHS~|~Noise wall construction 112237~|~1~|~1~|~01/NFA~|~Tree cutting project. 102035~|~1~|~1~|~01/NHS~|~signal upgrade at SAN-6/SAN-53 intersection. 98930~|~1~|~1~|~01/S>2~|~Sylvania Ave 94372~|~1~|~2~|~02/STR~|~STP Rural funding for PIC-104 spot paving 94372~|~1~|~1~|~01/IMS~|~IM funding for spot paving on interstateFRA-70, FRA-71, FRA-270, FRA-670 116995~|~1~|~1~|~01/MPO~|~Full depth reconstruction of Arlington Ave from Detroit Ave to Spencer St. 114514~|~1~|~1~|~01/STR~|~Resurfacing on the rural segments of US 42 in the project 114514~|~1~|~2~|~02/S>2~|~Resurfacing on the large urban portions of the project 114514~|~1~|~3~|~03/NHS~|~Resurfacing on the NHS portion of the project. 99630~|~1~|~1~|~01/S>2~|~Install sidewalks and lights on bridge approaches. 112136~|~1~|~1~|~01/S<2~|~Meeker Road Bridge Replacement 102542~|~1~|~1~|~01/CMQ~|~Signal upgrade at 17 locations throughout the City of Youngstown. 102921~|~1~|~1~|~01/STR~|~Pavement plan split 91242~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to add turn lane at LUC CR91 3-3.01 92726~|~1~|~1~|~01/MPO~|~Resurfacing CR 681 1.26 - 1.74 120876~|~1~|~1~|~01/NHS~|~Resurfacing 104447~|~1~|~1~|~01/S<2~|~100% State funded. 92077~|~1~|~1~|~01/IMS~|~8703698 WOO IR75 12.94 Intersect: Us 6 8703728 WOO IR75 12.94 Intersect: Us 6 97758~|~1~|~1~|~01/NFP~|~Construct new Fayette County Garage 94014~|~1~|~1~|~01/SAF~|~100% federal $'s up to cap amount to construct sidewalks and speed tables near Binns & Burroughs schools 108488~|~1~|~1~|~01/IMS~|~WZTS Plans split 93847~|~1~|~1~|~01/STR~|~Bridge painting project. VIN 677 3.47, SFN 8203393. Rural other federal aid funded 80 federal/20 state. 99777~|~1~|~1~|~01/IMS~|~Stream stabilization along Northbound I-71 beginning at the Red Bank Road intercahnge and drainage improvements at the Northbound Exit ramp to Stewart Road. 100630~|~1~|~1~|~01/STR~|~Resurfacing US 36 from SLM 3.85 to 13.86 100630~|~1~|~2~|~02/S<2~|~Resurfacing US 36 from SLM 13.86 to 15.90 100630~|~1~|~3~|~03/NHS~|~Resurfacing US 36 from SLM 15.90 to US 250 (SLM 17.63) 121284~|~1~|~1~|~01/STR~|~All Work is within this split 122742~|~1~|~1~|~01/NHS~|~Plan split for MPO STBG funded scope 122742~|~1~|~2~|~02/NHS~|~Plan Split for Urban Paving - Need to identify UP vs STBG limits. 110783~|~1~|~1~|~01/SAF~|~Infrastructure improvements will include the upgrade of three intersection crosswalks with hi-visibility markings, one proposed crosswalk with hi-visibility markings and rectangular rapid flashing beacon (RRFB) and sidewalk connection. 107781~|~1~|~1~|~01/STR~|~Landslide repair project. HOC 56 11.00-11.08. 100% Federal ER funding. 97761~|~1~|~1~|~01/BRF~|~Replacement of deficient bridge on MRG-CR75-0W4.41 (SFN 5838673) as part of the Governor's Ohio Bridge Partnership Program. 95301~|~1~|~1~|~01/ENH~|~This project consists of constructing a bike path from the intersection of Frederick Pike (CR 165) and Northcutt Place to the Stillwater River Trail. 97463~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code 95305~|~1~|~1~|~01/ENH~|~This project consists of the installation of bike lanes on Jefferson Street (CR 628) and on Patterson Blvd. (CR 539). 118990~|~1~|~1~|~01/STR/MCEO~|~Replacement of MUS CR 7 0.09 (SFN 6036023) 88351~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% funds. 107676~|~1~|~3~|~03/STR~|~Centerline rumble stripes on SR 309 in Allen County, SR 235 in Hardin County and SR 309 in Hardin County. On the rural STP system 107676~|~1~|~4~|~04/S<2~|~Centerline rumble stripes on SR 309 in Allen County and SR 309 in Hardin County. Work in Urban Areas but outside of municipalities 107676~|~1~|~1~|~01/STR~|~Resurfacing on US 224 in Hancock County from the Findlay Urban Area Boundary at CR 248 at SLM 19.941 to the Seneca County line at SLM 26.036. Funded using district preservation funds (80% 4PF7 and 20% 4PS7). 107676~|~1~|~2~|~02/S<2~|~Resurfacing on US 224 in Hancock County from the TR 212 at SLM 17.421 to the Findlay Urban Area Boundary at CR 248 at SLM 19.941. Funded using district preservation program funds (80% 4PF7 and 20% 4PS7). Although the work is inside of the Findlay Urban Area it is outside of the City of Findlay. No local funds are being used. 84650~|~1~|~1~|~01/NHS~|~ROS US35 10.22 - 14.47 resurfacing projectOn US35, beginning 1.15 miles west (SLM 10.22) of CR101 Westfall Overpass, heading south east for 4.25 miles and terminating 0.08 mile south east (SLM 14.47) of ramp 71040 to CR550, it is proprosed to resurface the 4 lane highway.Pave thru brdgs:7101643 ROS US35 13.33 Intersect: Stream7101678 ROS US35 13.4 Intersect: Co Rd 1027101694 ROS US35 13.53 Intersect: W Fork Of Biers Run7101708 ROS US35 13.75 Intersect: E Fork Of Biers Run80/20 split01/NHS/PV/State 109699~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 113801~|~1~|~1~|~01/BRF~|~Bridge replacement - fed/state exchange. 106700~|~1~|~1~|~01/BRF~|~Work to replace the bridge. Federal funds from the CEAO budget with a non-federal match provided by Paulding County. 91273~|~1~|~1~|~01/STR~|~PIK SR 335 16.95 OH11-02 Emergency Slide Repair 01/STR/OT/State 96408~|~1~|~1~|~01/NFA~|~Upgrade crosswalks, including curb ramps, pavement markings, traffic control signage and flashing beacons and provide new sidewalks at various locations near Libert, Wilcox and Lear North Elementary Schools in the North Ridgeville SD. 82378~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split using TRAC funds for all work. 107870~|~1~|~1~|~01/SAF~|~District Wide Lighting Maintenance Contract - D8 89485~|~1~|~1~|~01/SAE~|~Pavement markings and upgrade existing markings at various locations in Logan County. 94658~|~1~|~1~|~01/BRO/GCEO~|~"01/BRO/BR/GCEO" - OH189 SAFETEA-LU Earmark/County Engineer's Association Funding 4R47/4B87 (80% Federal) / 4BG7 (20% Local) - CAP = $257,664 (4R47) $3,400,000.00 (4B87) Federal dollars - Replacement of SFN 3030423 GUE CR 347 00.94 Intersect: Wills Creek; BR Eligible for Replacement: Length=117 SD/FO(1) SR=26.0 DSR=4 87339~|~1~|~1~|~01/STR~|~Resurfacing on SR 7 87339~|~1~|~2~|~02/NHS~|~Resurfacing on SR 7 104504~|~1~|~1~|~01/BRO~|~Plan split for CEAO eligible funding for bridge and roadway work associated with the bridge (SLM 9.03; SFN 1830449) over Riverview Road/a creek, bridge (SLM 9.35; SFN 1830457) over Cuyahoga Valley Scenic Railroad, and bridge (SLM 9.68; SFN 1830465) over Canal Road. 104504~|~1~|~2~|~02/NFP~|~Plan Split using 100% local funds for non-eligible work associated with roadway resurfacing items along Pleasant Valley Road. 119185~|~1~|~1~|~01/BRO~|~Plan split for HEN-109-0278 bridge 98998~|~1~|~1~|~01/S>2~|~Manville Rd 92527~|~1~|~1~|~01/BRF~|~Rehabilitate Bridge No. WAR-CR 200-0.96 (SFN: 8334404) by replacing the existing superstructure with a pre-stressed concrete composite box beam superstructure and complete minor substructure repairs and roadway related items. Structure carries Roachester-Osceola Road (CR-200) over Todd's Fork. 113487~|~1~|~1~|~01/SAE~|~SRTS funded plan split - 100% 4HJ7 119244~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing of MRW-314. 102808~|~1~|~1~|~01/NHS~|~NHS Pavement, LUC-20 from 8.00 to 8.86 and WOO-20 from 2.97 to 4.01 and WOO-20 from 4.45 to 4.63. 102808~|~1~|~3~|~03/S>2~|~S>2 Pavement. WOO 20 from 2.43 to 2.79 Perrysburg (Other) 102808~|~1~|~4~|~04/NHS~|~NHS Pavement. WOO-20-2.79 to 2.97 Perrysburg. 102808~|~1~|~5~|~05/NHS~|~NHS Pavement. WOO-20 from 4.01 to 4.45 Rossford-- only half of roadway width (Split corp.) 102808~|~1~|~2~|~02/S>2~|~S>2 pavement. WOO-25 from 20.32 to 20.82. 113419~|~1~|~2~|~02/S<2/LON~|~80% CEAO CSTP Funding to resurface CR-13 from 2.123 to 4.615 113419~|~1~|~1~|~01/NFA~|~80% CEAO CSTP Funding to resurface CR 11, CR 34 and CR 77 113419~|~1~|~3~|~03/STR/LON~|~80% CEAO CSTP Funding to resurface CR 2 and CR 13. 114912~|~1~|~1~|~01/NFP~|~Crack Seal plan split 96836~|~1~|~1~|~01/S<2~|~Install sidewalks gap closures and curb and gutter within the City of Urbana. 96836~|~1~|~2~|~02/S<2~|~Install sidewalks gap closures and curb and gutter within the Township. 96836~|~1~|~3~|~03/S<2~|~Water and sanitary work at the City's expense. 111542~|~1~|~1~|~01/MPO~|~TMACOG TAP funded items 111542~|~1~|~2~|~02/NFA~|~Locally funded plan split to reconstruct Water St and install decorative, proprietary, and landscaping features. 116277~|~1~|~1~|~01/STR~|~Chip Seal 105410~|~1~|~1~|~01/STR~|~Bridge repair/rehab on rural route bridge. 105410~|~1~|~2~|~02/S<2~|~Bridge repair/rehab on small urban route bridge. 93236~|~1~|~1~|~01/MPO~|~Reconstruction including new roadway, curbs, sidewalks, street lighting and lawn areas along with striping of the bike lanes on Warren Street/Brown Street from Wyoming Street to Buckeye Street. 105123~|~1~|~1~|~01/STR~|~Culvert replacement 91767~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. NOB 215 0.00-4.61. Rural other federal aid funded 80 federal/20 state. 119910~|~1~|~1~|~01/STR~|~Culvert liner project. WAS 145 2.09 (CFN 1803736). Funded 80% Federal/20% State. 83064~|~1~|~2~|~02/NHS~|~LAW US52 Brdgs F/Rehab:4400305 LAW SR650 4.28 Intersect: State Route 6504400364 LAW SR650 4.28 Intersect: State Route 65080/20 split 83064~|~1~|~1~|~01/NHS~|~LAW US52 2.17 - 5.00 resurfacing project 101959~|~1~|~1~|~01/STR~|~Spot paving repairs at various locations on the follow routes:DEL-257 5.69 (Butts Rd CR 139) to 14.26 (SR 37)UNI 42 4.58 (US 33) to 9.89 (Delaware County lineUNI-739 5.94 (SR 347) to 14.13 (SR 31) 101959~|~1~|~2~|~02/S>2~|~Spot paving repairs at various locations on the follow routes:DEL-257 1.50 (N of old Zoo entrance) to 5.69 (Butts Rd CR 139)DEL-750 4.43 (SR 315) to 5.58 (US 23) 112390~|~1~|~1~|~01/BRO~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 102296~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on PIC-104-0.00 to 15.34 102296~|~1~|~2~|~02/STR~|~Work on three structures 115990~|~1~|~1~|~01/STR~|~"01/STR/OT/ " 80% Federal (4SF7) and 20% State (4SS7) - repair of failed embankment 116355~|~1~|~1~|~01/STR~|~Resurfacing CAR-39 116891~|~1~|~1~|~01/S>2~|~Resurfacing 116891~|~1~|~2~|~02/ENH~|~Pedestrian Improvements 104934~|~1~|~1~|~01/ENH~|~Construction of a 7' wide sidewalk on the east side of Montgomery Road from School House Lane to Radabaugh Drive. 100652~|~2~|~1~|~01/IMS~|~Plan split to cover work on interstate bridges within Columbus metro. 100652~|~3~|~2~|~02/NHS~|~Created plan split for work on NHS. 87265~|~1~|~1~|~01/IMS~|~Concrete Pavement Repair project. WAS IR 77 6.59-16.37 SB only. Interstate route funded 90 federal/10 state. 100169~|~1~|~1~|~01/S>2~|~Mill & Fill Baumhart Road. 117664~|~1~|~1~|~01/SAF~|~All work is included in this split. 101007~|~1~|~2~|~02/NHS~|~SFN 8702160 101007~|~1~|~1~|~01/NHS~|~Convert two, stop-controlled intersections to single-lane roundabouts at Interstate 75 in Bowling Green. 101007~|~1~|~3~|~03/NFP/Bowl~|~Utilities 84552~|~1~|~3~|~03/NFP~|~Paving at the Hollister Outpost. 84552~|~1~|~2~|~02/S<2~|~Resurfacing project on ATH 13 and ATH 550. Urban other federal aid funded 80 Federal/20 State. ATH 13 2.709-4.617 and ATH 550 0.869-2.451. 84552~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. Rural other federal aid funded 80 federal/20 state. ATH 13 0.07-2.70, 4.61-16.41, ATH 329 19.65-19.99, ATH 550 2.45-6.94. 106393~|~1~|~1~|~01/SAF~|~Plan Split 110510~|~1~|~1~|~01/SAF~|~Intersection improvement project. GAL 160 9.57-9.77 and GAL 554 6.61. Safety funded 90 federal/10 state. 122455~|~1~|~1~|~01/STR~|~Work necessary to correct drainage deficiencies. 122455~|~1~|~2~|~02/STR~|~UNI SR 47: Work necessary to alleviate drainage issues 102095~|~1~|~1~|~01/NFA~|~The Port is assisting the City of Columbus and the Rickenbacker International Airport with the expansion of a new air cargo terminal. This project includes the upgrade and reconstruction of 520 feet of George Page Jr. Road. 106674~|~1~|~1~|~01/ENH~|~Paving of the Conotton Creek Trail. 81639~|~1~|~1~|~01/NHS~|~Resurfacing of POR US 422 from 0.17 to 1.94. 81639~|~1~|~2~|~02/NHS~|~Replace the following culverts CFN 674220040 POR-422-0.22CFN 674220050 POR-422-0.27CFN 674220110 POR-422-0.74CFN 674220130 POR-422-00.84 93233~|~1~|~1~|~01/MPO~|~Construct a bikepath from Wyoming Street and Steve Whalen Boulevard to Cleveland Park. The bike path will be built through Highland Park to Deanwood Avenue. Also a bike Boulevard along Deanwood Avenue to Santa Cruz Avenue in Cleveland Park. A bike path will be constructed through Cleveland Avenue. 123677~|~1~|~1~|~01/STR~|~culvert split. 83063~|~1~|~1~|~01/NHS~|~JAC SR32 12.47 - 17.54 Resurfacing ProjectJAC SR32 12.47 - 17.54 Resurfacing ProjectBegin project 0.72 mile east of the US35 underpass and end project 0.35 mile west of the Wellston corp limit. It is proposed to resurface the highway with asphalt concrete and to resurface Ramps A, B, C, & D of Interchange # 049200. Pave Thru Brdgs.4002210, 13.08 4002229, 16.57 Intersect: Meadow Run80/20 split 01/NHS/PV/State 83063~|~1~|~2~|~02/NHS~|~JAC SR32 12.47 - 17.54 Resurfacing ProjectBrdgs to rehab under Rural portion of NHS (12.47 - 16.37):4002164, 12.55 Intersect: Lick Run4002199, 12.55 Intersect: Lick RunBrdgs to rehab under Urban portion of NHS (16.37 - 17.54):4002237, 16.58 Intersect: Cty Rd 78, Fairgreens Rd4002245, 17.12 Intersect: State Route 3274002253, 17.12 Intersect: State Route 32780/20 split02/NHS/BR/State 83063~|~1~|~3~|~03/SAF/JAC~|~The addition of guardrail on CR 10 - Patterson RD 21642~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Cos SR 751 00.00 to 04.01; 2) Gue SR 265 4.58 to 17.49; 3) Gue SR 265 17.49 to 17.60; 4) Gue SR 821 0.00 to 00..47; 5) Gue SR 821 0.60 to 3.40; 6) Kno US 36 20.85 to 35.87; 21642~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Gue-SR 821-03.41 to 05.45; 2) Kno-US 36-20.68 to 20.85; 21642~|~1~|~3~|~03/NFA~|~"03/PV/NFA/ " - District Preservation Funding 4PS7 (100% State) - No CAP - Crack Sealing on: 1) Cos-SR 751-4.01 to 11.42; 2) Gue-SR 672-00.00 to 00.86; 3) Mus-SR 340-0.00 to 03.64; 4) Nob-SR 340-00.00 to 00.71; 5) Nob=SR 672- 00.00 to 00.37; 118560~|~1~|~1~|~01/S>2~|~Split for urban paving work 94044~|~1~|~1~|~01/IMS~|~Maintenance contract for traffic signal repair. 122501~|~1~|~1~|~01/BRO~|~MOE SR 260-5.50 Superstructure Replacement 94169~|~1~|~1~|~01/BRO~|~Replace superstructure - BR eligibleSFN 2401215, FAY-62-4.65, over Rattlesnake Creek 114876~|~1~|~1~|~01/NHS~|~Overlay JAC 35 114552~|~1~|~2~|~02/STR~|~Double Microsurfacing 114552~|~1~|~1~|~01/S5K~|~Resurfacing 114552~|~1~|~3~|~03/NFA~|~Resurfacing Not on Federal Aid System 114552~|~1~|~4~|~04/S5K~|~Install pavement interlayer on SR362 in Ft Loramie - 100% local funds 95103~|~1~|~1~|~01/S>2~|~Resurfacing of West Market Street, including curb ramps, guardrail, signing, and pavement markings, in the City of Warren, Trumbull County, Ohio. 124294~|~1~|~1~|~01/ENH~|~Shared use path repairs utilizing 100% Federal funds (TAP and Safety) up to Federal maximum. 117817~|~1~|~1~|~01/BRO~|~sPLIT FOR BRIDGE WORK 102346~|~1~|~1~|~01/NFP~|~Split for mowing 108875~|~1~|~1~|~01/S<2~|~Urban Paving Program mill and fill on CHP US 36 14.04 to 14.88 95450~|~1~|~1~|~01/SAF~|~Construction of roundabout at the intersection of CR11 (Alkire Road) and CR25 (Demorest Road). 22778~|~1~|~1~|~01/IMS~|~Provide new MSC overlay on BEL-470-0654(SFN 0706396). Replace Pin/hanger assembly with new or by making continuous. Paint end spans of structural steel and replace/repair crossframes. 108028~|~1~|~1~|~01/NFP~|~Crack Sealing 123830~|~1~|~1~|~01/SAF~|~Pavement Marking FY2031. 117178~|~1~|~1~|~01/S5K~|~HOC-Logan Resurfacing FY25 77583~|~1~|~1~|~01/IMS~|~Resurfacing 114911~|~1~|~1~|~01/NFP~|~Crack Seal plan split 80815~|~1~|~1~|~01/ERD~|~Upgrade and widen the intersection of SR 14 and Washingtonville Road/East Street. Signal installation is included. This amount is capped from the total earmark amount of$729,074 121150~|~1~|~1~|~01/STR~|~All Work is within this split 111529~|~1~|~1~|~01/MPO~|~MPO CMAQ funded items 107699~|~1~|~2~|~02/S<2~|~Resurfacing on US 224 inside the Findlay Urban Area using district preservation funds (80% 4PF7 and 20% 4PS7). Work is from the Findlay Urban Area boundary at CR 140 at SLM 10.75 to just west of the west corporation limits of the City of Findlay at SLM 11.54. No local funds. 107699~|~1~|~1~|~01/STR~|~Resurfacing on US 224 outside the Findlay Urban Area. Work is from SR 235 to the Findlay Urban Area boundary at CR 140 at SLM 10.75. Also resurfacing on SR 103 in the Village of Bluffton in Allen County. No local funds. District preservation funds (80% 4PF7 and 20% 4PS7) 107699~|~2~|~3~|~03/NFP~|~Work to raise the roadway elevation on US 224 roughly at the intersection of CR 223. The Hancock County Commissioners are the sponsors of this work. Funds for this work will be provided by Hancock County. 85095~|~1~|~1~|~01/STR~|~Plan split for 100% state funded items associated with culvert work. 100807~|~1~|~1~|~01/IMS~|~Replace bridge deck and paint bridge PRE-35-1.76L that carries Westbound US 35 over I-70 100807~|~1~|~2~|~02/IMS~|~Mill & fill the 35 WB ramp 102169~|~1~|~1~|~01/NFA~|~The City is constructing SR741 road improvements to support a new Masters harmaceutical headqtr and distribution. Adding a northbound left turn lane and southbound right turn/deceleration lane and related intersection improvements to align with Weldon Dr. 83011~|~1~|~1~|~01/IMS~|~Plane and pave the 74/275 overlap in Hamilton County 83011~|~2~|~2~|~02/BRO~|~Bridge rehabilitations include rigid overlays, painting, scour repair and other mionr rehab items. Approx. project limits are from the western IR 74/275 interchange to the eastern IR 74/275 interchange. 124050~|~1~|~1~|~01/NFP~|~Plan split for guardrail replacement work 124050~|~1~|~2~|~02/NFP~|~Plan split for guardrail maintenance and repair work 25062~|~1~|~2~|~02/S>2~|~Plan Split for SFN 5004985 MAH SR 289 04.85 over Tributary of the Mahoning River 25062~|~1~|~1~|~01/S>2/CAMP~|~Plan Split for Paving MAH SR 289 3.71 to 5.69 all in the City of Campbell. 102219~|~1~|~1~|~01/NFP~|~LAW CR 144 1.46 101424~|~1~|~1~|~01/IMS~|~Microsurface HAM IR 71 SLM 17.88 to 19.89 93720~|~1~|~1~|~01/NFA~|~Add Information 123574~|~1~|~1~|~01/S>2~|~Crack sealing in D8. Routes TBD 105337~|~1~|~1~|~01/STR~|~AC overlay 105337~|~1~|~2~|~02/S<2~|~AC Overlay 87278~|~1~|~1~|~01/S<2~|~Resurfacing on SR 147 in the Bridgeport-Wheeling urban area (SLM 33.48 to SLM 34.90) 87278~|~1~|~3~|~03/NFA~|~Resurfacing on SR 147 on the non federal aid portion (SLM 20.27 to SLM 29.18 and from SLM 29.30 to SLM 33.48) 87278~|~1~|~2~|~02/STR~|~Resurfacing on SR 147 in the rural section (SLM 29.18 to SLM 29.30) 107619~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - For complete upgrade of signals or flashers at various locations in District 5. 107099~|~1~|~1~|~01/SAF/KCEO~|~Knox County Engineer's CEAO HSIP Funding - 4HB7 (100 % Federal) - See CAP comment - Project for Pavement Markings to be upgraded or replaced on various County Routes within Knox County. 105831~|~1~|~1~|~01/MPO~|~Replacement and resurfacing of St. John's Terrace, Blue Ash Road, and Orchard Lane (between Plainfield Road and Sycamore Township), replacement of curb and gutter, driveway aprons, and sidewalk. Installation of signage and pavement markings, and reconfiguration of the existing RR crossing at the south side of Chamberlain Park to make the crossing ADA accessible. 105831~|~1~|~2~|~02/MPO/GCWW~|~Plan split for 100% locally funded waterworks improvements to be constructed as part of this project. 105197~|~1~|~1~|~01/STR~|~AC Overlay with repairs on:BUT-130 SLM 0.00 to 4.05 105197~|~1~|~2~|~02/S>2~|~AC Overlay with repairs on:BUT-130 SLM 4.05 to 4.70 90893~|~2~|~2~|~02/S<2~|~Urban System Paving- City of Salem; includes curb ramps and auxiliary pavement markings. 90893~|~1~|~1~|~01/S<2~|~Urban System Paving- City of Salem; COL-14-1.78 to 2.43/3.82 to 4.34 and COL-344-0.12 to 0.29; includes asphalt resurfacing, long line pavement markings 90893~|~1~|~3~|~03/NHS~|~Urban System Paving- City of Salem; COL-9-13.55 to 14.06, 14.33 to 14.72, 15.13 to 15.64; includes asphalt resurfacing, long line pavement markings 108747~|~1~|~1~|~01/STR~|~JAC 139 10.52 Bridge replacement 105576~|~1~|~1~|~01/S<2~|~RIC-SR-39 14.980 SFN 7002165 (OVER TOBEYS RUN) New Construction ? Structure(repl) (002) 113746~|~1~|~1~|~01/SAF~|~Safety funded signal items 102331~|~1~|~1~|~01/NHS~|~Resurfacing of TRU US 422 from 0.00 to 2.05. 102331~|~1~|~2~|~02/NHS~|~Minor bridge work 10' to 20' span. 107406~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Rehabilitation of SFN 4503090 carrying CR 42 (Watkins Road) over IR 70 111162~|~1~|~1~|~01/NFP~|~Campground resurfacing 105113~|~1~|~1~|~01/NFA~|~BRO 221 5.54 (SFN 0802913) bridge replacement. 105113~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 87451~|~1~|~1~|~01/S>2~|~Colerain Ave: I-74 to Blue Rock Rd; Blue Rock Rd: Colerain Ave to Spring Grove Ave; Elmore St: Colerain Ave to Spring Grove Ave Colerain Avenue: Widen the roadway to standard lane widths with new pavement, addition of curb, tree lawn, and sidewalks, and addition of left turn lanes where needed. Blue Rock Road: Realign the Blue Rock/Colerain intersection, construct standard lane widths with new pavement, addition of curb and sidewalk, improvements to the Blue Rock/Hamilton intersection, and realignment of the Blue Rock/Spring Grove intersection. Also restripe and resign the Colerain Ave-Spring Grove Ave/William P Dooley Bypass-Elmore Street triangle to improve efficiency. Sponsor - City of Cincinnati 116503~|~1~|~1~|~01/NFA~|~Adding plan split. 97433~|~1~|~1~|~01/SAE~|~Installation of new and upgrade of existing guardrail on various Medina County roads. 106256~|~1~|~3~|~03/STR~|~Resurfacing adjacent to the Village of Bluffton project. Work from the Norfolk Southern overpass at o.44 to the Norfolk Southern at grade crossing at 1.75. All funds from the District Preservation Program budget. No local funds. 106256~|~1~|~1~|~01/STR~|~Work on the SR 103 from the Norfolk Southern at grade crossing at 1.75 in Allen County to the west side of Citizens Parkway at 0.19 in Hancock County. Work funded with funds from the District Preservation Program budget. No local funds. The District has committed to pay for the top 3 inches of asphalt on SR 103. The District will also pay for pavement markings. 106256~|~1~|~2~|~02/STR/BLUF~|~Work on SR 103 from the Norfolk Southern at grade crossing at 1.75 in Allen County to the west side of Citizens Parkway at 0.19 in Hancock County. This is for all the project not funded with funds from the District Preservation Program budget. Currently it is unfunded. After funds are received the work may be in more than one split. 121064~|~1~|~1~|~01/IMS~|~Resurfacing 121064~|~1~|~2~|~02/NHS~|~Resurfacing 121064~|~1~|~3~|~03/S>2~|~Resurfacing 121064~|~1~|~4~|~04/S50~|~Resurfacing 121064~|~1~|~5~|~05/S5K~|~Resurfacing 121064~|~1~|~6~|~06/STR~|~Resurfacing 115928~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over Small Run. 108520~|~1~|~1~|~01/NFA~|~The City will extend Production Drive. 109415~|~1~|~1~|~01/BRO~|~Bridge replacement project 80% 4B87 (CEAO) and 20% LNTP (Local) 99555~|~1~|~1~|~01/NFA~|~Add sidewalk along N. Murray and Mount Vernon where it is missing. 110859~|~1~|~1~|~01/S<2~|~Major new funding plan split 81715~|~1~|~1~|~01/BRO~|~Replace existing bridge (CAR-212-0719, SFN 1001566) with a Type A culvert 84452~|~1~|~1~|~01/IMS~|~Bridge painting project. NOB IR 77 0136 L (SFN 6100090), NOB IR 77 0136 R (SFN 6100120), NOB IR 77 0746 L (SFN 6100481), NOB IR 77 0746 R (SFN 6100511), NOB IR 77 0820 (SFN 6100546), NOB IR 77 1096 L (SFN 6100570), NOB IR 77 1096 R (SFN 6100600), and NOB IR 77 1581 (SFN 6100813). 90% Federal and 10% State. 84452~|~1~|~2~|~02/BRO~|~Bridge painting project. NOB IR 77 0574 (SFN 6100457). BR eligible funded 90 federal/10 state. 110919~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County CEAO Bridge Replacement Project - 4B87 (100% Federal) - See CAP Comments 119070~|~1~|~1~|~01/MPO/DELH~|~ Installation of new signals at Delhi Avenue and Klemme Drive and at Delhi Avenue and Delhi Towne Square. Widen approach of Klemme Dr South of intersection. New sidewalks. 111207~|~1~|~1~|~01/MPO~|~MPO Funded Plan split 92373~|~1~|~2~|~02/STR~|~For bridges on SR-191. 92373~|~1~|~1~|~01/STR~|~resurface WIL SR 191 4.95-9.87 - Horton Rd to US-20A 111008~|~1~|~1~|~01/SAF~|~Extending TRU SR 46 SB Right Turn Lane from Hidden Hills to Dawson. 119247~|~1~|~1~|~01/IMS~|~All items of work associated with resurfacing of I-270. 119247~|~1~|~2~|~02/NHS~|~All items of work associated with the resurfacing of SR-161 119247~|~1~|~3~|~03/S>2~|~All Items of work associated with the resurfacing of SR315. 119472~|~1~|~1~|~01/SAE~|~Split for safety improvements 110263~|~1~|~1~|~01/NHS~|~Culvert liner project. ATH 50 26.52 (SFN 0501970). NHS route funded 80 federal/20 state. 93262~|~1~|~1~|~01/STR~|~Rebuild and replace deck edges, refurbish abutment bearings, and coat ends of beams on SFN 1904175 DAR 721 0204 over Greenvile Creek. 115773~|~1~|~1~|~01/STR~|~Bridge Replacement. 93302~|~1~|~1~|~01/S<2~|~Circleville urban paving and in urban func class area:PIC 56: 19.57-20.66 93302~|~1~|~3~|~03/STR~|~General system paving and in rural func class areaPIC-56: 22.04-33.93PIC-180: 0-0.48 93302~|~1~|~2~|~02/S<2~|~General system paving and in urban func class areaPIC-56: 20.66-22.04 92562~|~1~|~1~|~01/S>2/CANT~|~Safety improvements. 118815~|~1~|~1~|~01/S50~|~All work included in this split. 93760~|~1~|~1~|~01/ENH~|~Contruction of multi-purpose trail between Post Road and Solon Trail, in the City of Twinsburg. 102964~|~1~|~2~|~02/NFA~|~Smooth seal on Non-Federal Aid routes: LOG SR 347 SLM 2.37 to 2.56 & AUG SR 385 SLM 0.00 to 3.93. 102964~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: LOG SR 540 SLM 3.81 to 8.72, LOG SR 347 SLM 2.56 to 3.63 & LOG US 68 SLM 10.48 to 11.43. 102964~|~1~|~3~|~03/NHS~|~Smooth seal on NHS route: LOG US 68 SLM 10.09 to 10.48. 119208~|~1~|~1~|~01/NHS~|~All items associated with resurfacing of US 33. 123457~|~1~|~1~|~01/IMS~|~Apply recessed and wet reflective markings in D-05. 106291~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in POR, STA and SUM counties. 97168~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 233 1.66, SFN 2703092. Rural other federal aid funded 80 federal/20 state. 108421~|~1~|~1~|~01/NHS~|~Bridge Plan split 124625~|~1~|~1~|~01/IMS~|~All work included in this plan split. 110471~|~1~|~1~|~01/SAF~|~Install left turn lanes along SR 43 in both NB and SB direction 110471~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 99867~|~1~|~1~|~01/BRF~|~Replace 4 cell concrete structure (SFN 5060206) over Sugar Creek with a Type A precast concrete arch structure including wingwalls and rock channel protection. Includes installation of guardrail, waterproofing and other miscellaneous work. 105304~|~1~|~1~|~01/IMS~|~Resurface portions of IR 71 in Hamilton County 110999~|~1~|~1~|~01/STR~|~Split for bridge replacement work 98150~|~1~|~1~|~01/S<2~|~0.00 to 2.6 111418~|~1~|~1~|~01/SAF~|~Signal replacement at MAH SR7 and SR164 in North Lima, Mahoning County, Ohio. 101325~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for the following STP Rural routes: MRW-746-0.00-3.08 UNI-161-6.31-12.19 UNI-347-0.00-4.23 UNI-739-14.74-22.68 UNI-47-0.00-7.57 101325~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for the following STP Rural routes: MRW-746-0.00-3.08 UNI-161-6.31-2.19 UNI-347-0.00-4.23 UNI-79-14.74-22.68 UNI-47-0.00-7.57 114150~|~1~|~1~|~01/SAE~|~Signing and pavement marking improvements. Funding is 100% federal funds from the Safety program until the cap is reached. After the cap is reached all funding will be provided by Allen County. Safety funds are for the Construction Contract subphase. The Construction Engineering subphase is 100% local funds. 114150~|~1~|~2~|~02/NFP~|~Sealer to be put on the road and funded with 100% local funds provided by Allen County. 98081~|~1~|~1~|~01/NHS~|~Project will convert the existing intersection of US-42 (N. Columbus Street) and E. Church Street to a modern roundabout. Pedestrian facilities, curb and gutter, and storm sewer system will be constructed as part of the improvements. 110041~|~1~|~1~|~01/STR~|~Culvert replacement/repair project. GAL 218 7.87 (CFN 1819482), GAL 553 2.02 (CFN 1820266), GAL 554 13.09 (CFN 1834854) and GAL 790 6.66 (CFN 1820260). Funded 80 federal/20 state. 93275~|~1~|~1~|~01/BRO~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4200721 & 4200756 KNO SR13 18.33 Intersect: Trib Of N Br Kokosing Riv; BR Eligible for Rehabilitation: Length=67 SD/FO(1) SR=67.4 DSR=7 95585~|~1~|~2~|~02/IMS~|~ASD-71-7.47 bridge (Interstate bridges under 20 ft).RIC-71-16.45 bridge (Interstate bridges under 20 ft). 95585~|~1~|~3~|~03/NHS~|~RIC-30-8.20 bridge (NHS bridge under 20 ft). 95585~|~1~|~1~|~01/IMS~|~ASD-511-10.59 bridge over I-71 (Interstate bridge over 20 ft). 104915~|~1~|~1~|~01/NFA~|~Cham pion Schools school bus replacement project 94152~|~1~|~1~|~01/IMS~|~Resurfacing of I-71 from SLM 0.00-14.98 No bridge work at this time 109818~|~1~|~1~|~01/NHS~|~All work is included in this split. 119358~|~1~|~1~|~01/STR~|~Plan split for project to replace or line bridge size culvert CLI-72-0218. 95435~|~1~|~2~|~02/IMS~|~8703574, 8703604, 8703698, 8703728, 8703965, 8704023, 8704112, 8704082 95435~|~1~|~1~|~01/IMS~|~WOO-75 from SLM 11.18 to SLM 19.43 94394~|~1~|~1~|~01/NHS~|~General System Resurfacing 94394~|~1~|~2~|~02/S<2~|~Concrete Pavement Repairs in ERI-SR-0113 in Milan 118908~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 101998~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4. 104067~|~1~|~1~|~01/S<2~|~Guardrail replacement project on various routes and sections in ATH Co. CEAO funded. Funded 100% federal. 119001~|~1~|~1~|~01/BRF/STCE~|~Bridge rehabilitation. 97790~|~1~|~1~|~01/NFP~|~100% State - Construction Project Inspection Task Order 96094~|~1~|~1~|~01/IMS~|~?01/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP ? Deck replacement: SFN 3000907, GUE-70-02.81 carrying CR 143 over IR 70. Not BR Eligible for Rehabilitation: Length=288; SD/FO = (2); SR = 83.5; DSR = 7; 91580~|~1~|~1~|~01/STR~|~Deck Replacement. 7302614 SCI SR73 11.74 Intersect: Wolf Run80 Fed/20 State. 01/STR/BR/State 120779~|~1~|~1~|~01/S>2~|~Resurfacing work for Fairport Rd and Water St. 119149~|~1~|~1~|~01/NHS~|~Resurfacing ATH-33-11.79-14.07, ATH-50-5.02-10.32, and ATH-32-0.00-1.40 109561~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 95407~|~1~|~1~|~01/NHS~|~Remove and replace LMC overlay, rebuild deck edges, reface abutments using anodes, patch pier caps, encase piers, rebuild wingwalls, and install polymer modified asphalt expansion joint system. SFN 1103245 Tributary of Anderson Creek, SFN 1103334 Russell Creek 113553~|~1~|~1~|~01/BRF~|~CEAO funded Bridge Replacement 107299~|~1~|~1~|~01/NFP~|~Split for work on the interstate system. 121331~|~1~|~1~|~01/NHS~|~FRA US 33 and FRA SR 16 121331~|~1~|~2~|~02/S>2~|~FRA SR 161 121331~|~1~|~3~|~03/S>2~|~Added CO CO Contr 03 funding event per 2024 MYWP Spreadsheet 112841~|~1~|~1~|~01/S>2~|~Resurfacing of MAH SR 46 from 13.48 to 16.64 112841~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 93443~|~1~|~1~|~01/STR~|~WOO SR 105 8.81-12.24 resurfacing 120107~|~1~|~1~|~01/NHS~|~All work included in this split. 105683~|~1~|~1~|~01/NHS~|~District Preservation - 4PF7(80%)/4PS7(20%) - No CAP - Replacement of extrusheet signs on FAI-33, MUS-16, LIC-79. 105683~|~1~|~2~|~02/S<2~|~District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - 1) Installation of warning signs on CR 35 where it goes under IR 70/IR 77 interchange Bridges at GUE-CR 35-07.25 to 07.60; 2) Directional signage on Lic-SR 79 04.09 to 04.11 113257~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work. 109633~|~1~|~1~|~01/STR~|~Emergency repair on BRO 41 3.36. 109488~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 122132~|~1~|~1~|~01/STR~|~Bridge repair project. Pile plating and encasement. GAL 233 1.66 (SFN 2703092). 82632~|~1~|~1~|~01/NHS/NRdg~|~Major New Funds / Safety Funds / MPO (STP) / City of North Ridgeville - Added Capacity Items (85%) 82632~|~1~|~3~|~03/NHS/NRdg~|~100% City of North Ridgeville for non project eligible water and earthwork. 82632~|~1~|~6~|~06/BRF~|~Bridge Replacement on CR24 (Root Rd) due to roadway alignment adjustment 82632~|~1~|~4~|~04/CMQ~|~Signal Work eligible for CMAQ funds. 82632~|~1~|~8~|~08/NHS~|~$2,400 is to pay Consultant Inspection for activities under Plan Split 3/1 82632~|~1~|~9~|~09/NHS~|~Ongoing Consultant Services during Construction 82632~|~1~|~10~|~10/NHS~|~Ongoing consultant services during construction. 82632~|~1~|~11~|~11/NHS~|~Ongoing Consultant services during construction. 82632~|~1~|~7~|~07/BRO~|~Bridge Replacement and widening at Str LOR-20-22.64 82632~|~1~|~5~|~05/ENH~|~Multi Use Path. 82632~|~1~|~2~|~02/NHS/NRdg~|~Major New Funds / Safety Funds / MPO (STP) / City of North Ridgeville - No Added Capacity Items (15%) 82632~|~1~|~12~|~12/NHS~|~Ongoing Consultant Services during Construction 82632~|~1~|~13~|~13/NHS~|~Consultant Inspection paid with District Funds 101740~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan Split 1 for Fai-204-11.16 to 13.86, Fai-204-16.08 to19.13 101740~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - Plan Split 2 for Fai-204-13.86 to 16.08 101740~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - Plan Split 3 for Per-204-0.00 to 18.66 122999~|~1~|~1~|~01/S50~|~All work included in this plan split. 103346~|~1~|~1~|~01/S<2~|~Removal of Bridge 77582~|~1~|~1~|~01/NHS~|~Preventive Maintenance Resurfacing80/20 Fed/State 102484~|~1~|~1~|~01/STR~|~Resurfacing of HOL-39 and TUS-39 124383~|~1~|~1~|~01/MPO~|~Plan split for intersection improvements utilizing NOACA carbon reduction funding 117788~|~1~|~1~|~01/NFP~|~Reconstruction of the Rest Area Parking lot, sidewalks, ADA ramps and other miscellaneous items 113611~|~1~|~2~|~02/SAF~|~Thermoplastic pavement marking upgrade. Safety Funded. 113611~|~1~|~1~|~01/STR~|~Pavement marking project. Rural other federal aid funded 80 federal/20 local. 114857~|~1~|~1~|~01/NHS~|~Repair curb & gutter and improve the existing drainage. 110691~|~1~|~1~|~01/S<2~|~Construction Inspection 110691~|~1~|~2~|~02/S<2~|~Construction Inspection 97699~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 33 13.65-13.84. NHS route funded 80 federal/20 state. 96432~|~1~|~1~|~01/NFP~|~100% state participation in the repair and resurface pavement surface of existing parkway roads and parking areas. 110711~|~1~|~1~|~01/NHS~|~Resurfacing ATB SR 11 from 13.94 to 22.16. 110711~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 109152~|~1~|~1~|~01/NFP~|~All work for the project is in this plan split. 111667~|~1~|~1~|~01/NHS~|~Culvert rehabs 121639~|~1~|~1~|~01/MPO/STOW~|~Resurfacing. 93292~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - 4PF7 (80%)/4PS7 (20%) - No CAP - rehabilitation of rear abutment and drainage on LIC-79-13.79R (SFN 4504429). 93292~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge deck rehabilitation of SFN 4504747 carrying SR 79 over IR 70: BR Eligible: Length = 255; SD/FO=1; SR=78.0; DSR=4; 93292~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Lic-SR 79-04.19 to 04.53 inside LA and classified IMS 121620~|~1~|~1~|~01/NFP~|~ODNR project to construct full depth flexible pavement for Appalachian Hills WLA road NR1 to proposed visitor center driveway. Funded 100% State. 124387~|~1~|~1~|~01/NFA~|~Bridge rehabilitation of SFN 1602713. 96981~|~1~|~1~|~01/IMS~|~Pavement markings on various routes in POR, STA and SUM counties. 112899~|~1~|~1~|~01/STR~|~Culvert replacement. 116922~|~1~|~1~|~01/S>2~|~Bridge Replacement 123838~|~1~|~1~|~01/STR~|~Replacement of superstructure SFN 4202864 along SR 229 in Knox County. 99043~|~1~|~1~|~01/S>2~|~Apply herbicides along roadsides for weed control on 4 lane roads 111593~|~1~|~1~|~01/NHS~|~Federally eligible items. 113956~|~1~|~1~|~01/SAF~|~Pedestrian improvement project in the City of Marietta. Locations include: Butler Street, Putnam Street, 2nd, 3rd, 4th, Front Street, Washington Street and Marion Street. Work includes pavement markings, signs, RRFB's and signal timing. 114558~|~1~|~1~|~01/STR~|~AC Overlay without repairs. 114558~|~1~|~2~|~02/S<2~|~AC Overlay without repairs. 25261~|~1~|~2~|~02/S<2~|~Work on US 224 from the CSX RR at 11.44 to US 30 at 12.23. All funds from the District Preservation Program budget. No local funds. Work is inside the Van Wert Urban Area but outside of the City of Van Wert. 25261~|~1~|~3~|~03/NFP~|~Resurfacing the rest area ramps, and resurfacing the weigh station ramps and parking lot. Rest Area funds SAC 4BR7 from ODOT Central Office Facilities. 25261~|~1~|~1~|~01/NHS~|~Work on US 30 which is an NHS route from 4.07 to 11.25. All funds from the District Preservation Program budget. No local funds. The SAC 7BPB bond funds are to be used before the other funds. 122580~|~1~|~1~|~01/BRF/SUCE~|~Superstructure replacement. 88932~|~1~|~1~|~01/S>2~|~US422 18.97-21.16 88932~|~1~|~2~|~02/S>2~|~not BR Eligible: SFN 7807155 US422 19.94 over squaw creek. SFN 7807228 US422 20.02 over squaw creek. 88932~|~1~|~3~|~03/S>2/GIRA~|~100% Local items under Urban Paving policy. 115134~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. 81481~|~1~|~1~|~01/STR~|~Rehabilitate bridge WAR-132-0553 (SFN 8304920). Replace deck. 112837~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span. 112837~|~1~|~3~|~03/STR~|~Minor bridge rehab 10' to 20' span. 112837~|~1~|~1~|~01/STR~|~Resurfacing. 97004~|~1~|~1~|~01/STR~|~Spot Paving locations throughout District 11. 105777~|~1~|~1~|~01/BRO~|~Plan split for bridge rehab 105777~|~1~|~2~|~02/NFP~|~Split for 100% local work 112797~|~1~|~1~|~01/CMQ~|~Intersection improvement at Valley View Rd and Olde Eight Rd. 106726~|~1~|~1~|~01/S>2~|~Resurfacing city streets with Large City Funds 115753~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the large urban portions. 115753~|~1~|~2~|~02/S>2/LEB~|~Plan Split for the 100% City items on the urban paving project. This also includes the tiny rural section 79764~|~1~|~2~|~02/NHS~|~Preventive Maintenance Resurfacing 79764~|~1~|~1~|~01/NHS~|~Preventive Maintenance Resurfacing - NHS 109823~|~1~|~1~|~01/NFA~|~BRO 286 0.00-8.31BRO 774 0.00-3.04BRO 763 0.35-4.44 109823~|~1~|~2~|~02/S<2~|~BRO 763 0.00-0.35 84454~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 2800152 114582~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 146 16.35. Work includes drilled shaft wall. 123798~|~1~|~1~|~01/STR~|~stp rural 104807~|~1~|~1~|~01/SAF~|~Install LED stop signs on Chapel Road at the intersection with SR-132. 104807~|~1~|~2~|~02/SAF~|~Install 2 solar powered flashing beacons on the intersection warning signs in each direction (4 total) at the intersection of SR-132 & Chapel Rd. 13184~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all bridge work in Part 1. 13184~|~1~|~2~|~02/S>2~|~Plan split to install roller supports for the gas line in Part 1. 13184~|~2~|~3~|~03/S>2~|~80/20 fed/state funding split for all bridge work in Part 2. 13184~|~2~|~4~|~04/S>2~|~Plan split to install roller supports for the gas line in Part 2. 91338~|~1~|~1~|~01/STR~|~Two Lane resurfacing between SLM 0.00 to 5.940 113898~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 88085~|~1~|~1~|~01/IMS~|~4807383 LUC IR475 4.33 Intersect: Wolf Creek 4807413 LUC IR475 4.33 Intersect: Wolf Creek 99859~|~1~|~1~|~01/NHS~|~Paint existing steel superstructure and seal necessary concrete surfaces. 99859~|~1~|~2~|~02/IMS~|~Paint existing steel superstructure and seal necessary concrete surfaces. 123723~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on IR-271 express lanes, no added capacity 105297~|~1~|~1~|~01/STR~|~Herbicidal Spraying in BEL, HAS, and JEF 88956~|~1~|~3~|~03/IMS~|~Paving of Ramps D, C, G and F at I-77 interchange. Cost TBD. 88956~|~1~|~1~|~01/IMS~|~See linked structures. 88956~|~1~|~2~|~02/NHS~|~See linked structures. 97212~|~1~|~1~|~01/IMS~|~Construction Funding to regrade slope above I-74 84579~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 33 14.25-16.27 and ATH 50 14.14-17.50. NHS route funded 80 Federal/20 State. 120293~|~1~|~1~|~01/NFA~|~Install box culvert and roadway rehab on Germantown Rd and CR 250 in Noble County. 124460~|~1~|~1~|~01/NFP~|~Created for J&C TID involvement 115168~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr ERI SR 02 00.00 TO 7.772 80695~|~1~|~1~|~01/NHS~|~4807286 LUC IR80 10.03 Intersect: Ir475Nb & Us23 Mp0584 4807294 LUC IR80 10.02 Intersect: Ir475Sb & Us23 Mp0584 80695~|~1~|~2~|~02/IMS~|~4807286 LUC IR80 10.03 Intersect: Ir475Nb & Us23 Mp0584 4807294 LUC IR80 10.02 Intersect: Ir475Sb & Us23 Mp0584 100068~|~1~|~1~|~01/STR~|~LAW 243 10.40 Slide Repair 94806~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 1.38 to SLM 2.13 109614~|~1~|~1~|~01/STR~|~Replacement and rehabilitation of culverts within District 5 97960~|~1~|~2~|~02/STR~|~SR 47 SLM 0.87 to SLM 10.07 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in). 97960~|~1~|~1~|~01/S<2~|~SR 47 SLM 0.79 to 0.87 (OC 800) - resurface the existing roadway with asphalt concrete. 93677~|~1~|~1~|~01/STR~|~A culvert replacement at SEN-100 near TR44 Baker. No SFN. 116605~|~1~|~1~|~01/NFP~|~Culvert Project. 107521~|~1~|~1~|~01/STR~|~Plan split for resurfacing work. 120991~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 149 over abandoned railroad. 122343~|~1~|~1~|~01/MPO~|~Plan split for eligible repair and resurfacing work on Van Aken Blvd. 122343~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 88525~|~1~|~2~|~02/NHS~|~Structure at LUC-2-8.43 88525~|~1~|~1~|~01/NHS~|~Resurface LUC SR2 2.23-5.45 114436~|~1~|~1~|~01/STR~|~Culvert replacement 115948~|~1~|~1~|~01/MPO~|~Resurface Tremainsville Road from Laskey Road to Alexis Road. 95806~|~1~|~1~|~01/STR~|~STP Rural, HAS-799-5.08 and various other sites for culvert repair/replacement. 122313~|~1~|~1~|~01/BRO~|~Plan split to program project. Update after scope of work is complete. 94070~|~1~|~1~|~01/NHS~|~Interchange highway lighting replacement project using 80/20 split of 4PF7/4PS7 sac at JEF-7-24.09 (Franklin Avenue) and JEF-7-26.02 (Alexander St. aka 4th Street). 105928~|~1~|~1~|~01/SAE/MCEO~|~"01/SAE/OT/MCEO" - Muskingum County Engineer guardrail upgrade project funded by CEAO with a federal max of $300,000 78249~|~1~|~1~|~01/NHS~|~priority system minor rehab. of COL-7-3.55 to 5.20; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking 119791~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 98620~|~1~|~1~|~01/NFP~|~100% State on work items eligible for turnpike mitigation 104686~|~1~|~1~|~01/NFA~|~ROS CR VAR PM FY22 107104~|~1~|~1~|~01/NHS~|~plans split 91145~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement contract for FY 2015. ATH 13 4.00-4.52 NHS route funded Federal 80%/State 20%. 91145~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement contract for FY 2015. ATH 13 4.52-4.94 and ATH 682 6.80-7.10. Urban other federal aid funded Federal 80%/State 20%. 91145~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement contract for FY 2015. MOE 255 17.40-18.00. Not on any federal aid system funded Federal 100% State. 91145~|~1~|~3~|~03/STR~|~Guardrail upgrade/replacement contract for FY 2015. ATH 13 4.94-10.07, ATH 550 3.90-17.80, GAL 160 8.00-20.00, MRG 78 2.00-37.15, NOB 78 0.00-4.75, and VIN 160 8.00-9.00. Rural other federal aid funded Federal 80%/State 20%. 112904~|~1~|~1~|~01/STR~|~Culvert replacement 108870~|~1~|~1~|~01/NFA~|~township route 807 & 808, sib loan 83043~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation Funding - No CAP's - Crack sealing on Mus-SR 208-01.03 to 11.05; Per-SR 204-00.00 to 10.06 83043~|~1~|~5~|~05/S>2~|~"05/S>2/PV/ " - District Preservation Funding - No CAP's - Crack Sealing - Fai-SR 256-06.10 to 06.54 83043~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation Funding - No CAP's - Crack Sealing - Fai-SR 188-16.02 to 19.06; Mus-US 22-04.50 to 09.17 83043~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation-No CAP - Crack sealing - Mus-IR 70-05.56-10.06 83043~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation Funding - No CAP - Crack Sealing - Fai-SR 158-19.06 to 26.53; Fai-Sr 256-06.54 to 12.13; Fai-SR 664-07.47 to 12.62; Per-SR 93-00.00 to 11.58; Per-SR 13-19.83 to 26.88 93784~|~1~|~1~|~01/STR~|~Replace SFN 3601560 Located 1.66 miles west of Hillsboro on SR73 It is proposed to replace the deficient structure. 80/20 Split01/STP/BR/State 107946~|~1~|~1~|~01/SAF~|~plan split 107480~|~1~|~1~|~01/CMQ~|~Plan Split 124291~|~1~|~1~|~01/NFA~|~Restore rail station building and provide pedestrian facilities 98551~|~1~|~1~|~01/SAF~|~Upgrade traffic signal to enable implementation of safety countermeasures at the Intersection of State Route 47 and Fourth Street 116590~|~1~|~2~|~02/STR~|~Resurfacing on SR 65 in Allen and Putnam County outside the Lima Urban Area. Rural STP. District Preservation Program funds. No local funds. 116590~|~1~|~1~|~01/S50~|~Resurfacing on SR 65 in the Lima Urban Area but outside of the City of Lima (SLM 11.24 to 13.91). District Preservation Program funds. No local funds. 95841~|~1~|~1~|~01/S<2~|~Cut back all four corners of intersection and install new traffic signal at the Intersection of Stanely Avenue and Webster Street. 103996~|~1~|~1~|~01/NFA~|~Rehab Wabash Road Bridge 105474~|~1~|~1~|~01/STR~|~SR 107 slm 0.00 to 7.08. 105474~|~1~|~2~|~02/STR~|~Bridge split 105474~|~2~|~3~|~03/NHS~|~Part 2 Plan Split - Wil 20 100682~|~1~|~1~|~01/STR~|~Chip sealing TUS-516 from SLM 3.70 to TR 207 (SLM 7.05). 100682~|~1~|~2~|~02/S<2~|~Chip sealing TUS-516 from TR 207 to TR 1344. 100682~|~1~|~3~|~03/NFA~|~Chip sealing TUS-751 from the COS Co. Line to the Stone Creek Corp. 119416~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m. 93894~|~1~|~1~|~01/BRF~|~Bridge replacement of structure over Kale Creek, in Portage County, Ohio. 110155~|~1~|~1~|~01/S>2~|~Bridge repair 110155~|~1~|~2~|~02/IMS~|~Bridge repair - bridge under 20' 110155~|~1~|~3~|~03/IMS~|~Bridge repair - bridge over 20' 96202~|~1~|~1~|~01/NFA~|~Application of 1.5 inches of asphalt overlay, installation of a 3 inch topsoil berm against new pavement with seed, fertilizer, and mulch, application of thermoplastic pavement markings with silica sand for skid resistance, and full depth pavement repairs where needed. 98289~|~1~|~1~|~01/IMS~|~Bridge rehabilitation along IR 70 near IR 77 interchange. 113668~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 22.52. Funded 100% state ER. 107074~|~1~|~1~|~01/NFA~|~HIG CR Various PM 107743~|~1~|~1~|~01/NHS~|~LUC-2-3.501 99721~|~1~|~1~|~01/MPO~|~New Sidewalk on Canton Road (west side) from Sanitarium Rd to 500' south of Springfield Lake Drive. 108177~|~1~|~1~|~01/IMS~|~ER Repair - repair landslide. 94368~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds SAC 4PS7. 122229~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-90-B 102398~|~1~|~2~|~02/NFA~|~SR 60 2.97 to 3.31: 1" 424 FGP SR 60 3.31 to 3.76: Asphalt 2" mill and fill without repairs 102398~|~1~|~1~|~01/STR~|~SR 39 5.72 to 6.73 and 11.44 to 17.38: 1" 424 FGP SR 60 0.00 to 2.97: 1" 424 FGP SR 60 3.76 to 4.20: Asphalt 2" mill and fill: SR 83 9.02 to 10.27 101115~|~1~|~1~|~01/STR~|~Chip seal on rural routes: LOG SR 273 SLM 12.89 to 13.49AUG SR 219 SLM 4.11 to 6.01CHP SR 559 SLM 7.89 to 11838MIA SR 718 SLM 0.00 to 3.26AUG SR 219 SLM 0.00 to 1.09AUG SR 67 SLM 8.25 to 13.48AUG SR 67 SLM 14.43 to 18.94CLA SR 41 SLM 0.00 to 3.63 101115~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal Aid routes: LOG SR 273 SLM 9.91 to 12.89LOG SR 559 SLM 0.00 to 4.02LOG SR 638 SLM 0.00 to 3.99 115166~|~1~|~1~|~01/IMS~|~All work associated to the rehabilitation of bridge CLI-71-1237 and GRE-71-0150 103678~|~1~|~1~|~01/SAE~|~Replacement of Type A assemblies on Interstate and NHS Routes throughout District 4. 105953~|~1~|~1~|~01/STR~|~Emergency slide repair. 124440~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 113455~|~1~|~1~|~01/BRF~|~Sanctuary Road Bridge replacement work. 124532~|~1~|~1~|~01/NHS~|~Reconstruct roadway 87243~|~1~|~2~|~02/S<2~|~LAW SR650 Resurfacing Urban Area portion: 0.10 - 0.3080/20 split 87243~|~1~|~1~|~01/STR~|~LAW SR650 ResurfacingRural Portion: 0.30 - 4.43Pave thru Bridges:4404149 LAW SR650 0.9 Intersect: Osbornes Run 4404173 LAW SR650 0.93 Intersect: Osbornes Run 4404211 LAW SR650 1.84 Intersect: Osburns Run Creek 4404246 LAW SR650 2.12 Intersect: Osbornes Run 80.20 split 80/20 split 87243~|~1~|~4~|~04/NFA~|~LAW SR650 0.00-9.28 Resurfacing Brdg Rehab: 4404297 LAW SR650 7.08 Intersect: Little Pine Creek 4404335 LAW SR650 9.02 Intersect: Pine Creek 100% state 87243~|~1~|~3~|~03/NFA~|~LAW SR650 Resurfacing Non Fed Aid Portion: 4.43 - 9.28Brdg Pave Thru: 4404254 LAW SR650 4.77 Intersect: Kelly'S Mill Branch 100% state 101933~|~1~|~1~|~01/ENH~|~Multi-use path on Burbank and Beale from Highland to Larwill. 124721~|~1~|~1~|~01/SAF~|~Install new/upgrade existing pavement markings on various county roads in Clinton County. 88374~|~1~|~1~|~01/S<2/PATA~|~"01/<2/OT/PATA" - City of Pataskala SRTS Sidewalk project - CAP SRTS Federal (4SC7) $433,500.00 98002~|~1~|~1~|~01/NHS~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on NHS portions of US 62 98002~|~1~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on OFAH-Rural portions of 1 US 62 98002~|~1~|~3~|~03/NHS~|~District Bridge Preservation Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP - Bridge work on NHS portions of LIC-62 98002~|~1~|~4~|~04/STR~|~District Bridge Preservation Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP Bridge work on STP-Rural portions on LIC-62 110680~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span. 110680~|~1~|~4~|~04/STR~|~Minor bridge rehab > 10' to 20' span. 110680~|~1~|~1~|~01/STR~|~Resurfacing. 110680~|~1~|~2~|~02/NHS~|~Minor bridge work. 77268~|~1~|~1~|~01/IMS~|~Widen IR-76 to six lanes from Barber Road to State Street, Summit County, Ohio. 104831~|~1~|~1~|~01/S>2~|~Reconstruct and resurfacing on local road in the City of Springfield. 102040~|~1~|~1~|~01/STR~|~Slide repair on ADA SR 247 7.78. 86895~|~1~|~2~|~02/SAE~|~Construction of railroad signal preemption interface panel, cable, and battery backup for the Kemper Road and Reading Road intersection. 86895~|~1~|~1~|~01/MPO~|~Reading Road: from Kemper Road to Crescentville Road; Hauck Road: from Reading Road to 700 ft. east of Reading Road OKI Improvements to Reading Road consist of the addition of a two-way left turn lane through the majority of the corridor; also left and right turn lane addition and signal replacement to improve LOS at the intersection of Reading Road and Hauck Road. In addition, an existing railroad bridge over Reading Road will be removed, an existing curve will be realigned to improve safety, and a shared use bikepath on the west side of Reading Road will be constructed. Improvements on Hauck Road inlcude widening for the addition of a left-turn lane from westbound Hauck Road at Reading Road. 82822~|~1~|~2~|~02/STR~|~Culvert Replacement - District Allocation 82822~|~1~|~1~|~01/STR~|~Geotech Funds - slip repairs several locations 116773~|~1~|~1~|~01/NHS~|~ASD US 0250 22.09 & 22.57 124326~|~1~|~1~|~01/NFP~|~Construct a new parking lot. 124326~|~1~|~2~|~02/NFP/PARK~|~Trail work along edge of parking lot. 106784~|~1~|~2~|~02/NFP~|~Work to repair/resurface Prospect Avenue from E. 22nd to Carnegie Ave that is not eligible for federal-aid. 106784~|~1~|~1~|~01/NHS~|~Work to repair/resurface Prospect Avenue from E. 22nd to Carnegie Ave that is eligible for federal-aid. 109421~|~1~|~1~|~01/SAE~|~Guardrail upgrade/repair work eligible for federal-aid 85508~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 98914~|~1~|~1~|~01/NFA~|~Resurface various couty roads with a chip seal treatment. Routes include CR 68 0.00-5.78, CR 76 1.69-4.47, CR 72 1.14-2.13, CR 84 2.47-2.69, CR 74 0.00-0.35. Not on any federal aid system funded 80 federal/20 local. 98914~|~1~|~2~|~02/NFA~|~Replacement of a 31 foot bridge over Camp Creek on GAL CR 68 0357, SFN 2737361. Not on any federal aid system funded 80 federal/20 local. 124773~|~1~|~1~|~01/S50~|~Small City Program Funding for SR 61 reconstruction project (FY2030) with Reservoir of FY 2029 118683~|~1~|~1~|~01/S50/NEWA~|~Resurfacing plan split 110612~|~1~|~1~|~01/MPO~|~Construction of a sidewalk on the south side of Franklin Street (SR 725) from just west of Little Sugarcreek Road to just west of West Street. 110612~|~1~|~2~|~02/S>2~|~Plan split for the patching of the GRE-725-0193 bridge abutments only using District preservation 124499~|~1~|~1~|~01/S5K~|~Reconstruction STP 5k-50k 124499~|~1~|~2~|~02/STR~|~Reconstruction STP Rural 100642~|~1~|~1~|~01/IMS~|~Plan split for Interstate 275 in Clermont SLM 11.02 - 13.88 and Hamilton SLM 35.12 - 37.51 112269~|~1~|~1~|~01/SAF~|~Raised pavement marker project throughout the District 113392~|~1~|~1~|~01/S>2~|~Roadway resurfacing including milling of existing asphalt and placement of tack coat, new asphalt and pavement markings. 113392~|~1~|~2~|~02/S>2~|~Curb replacement, full depth repair and catch basin replacement to be paid by the City of Riverside. 95291~|~1~|~1~|~01/CMQ~|~For the purchase of 2 trucks 112716~|~1~|~1~|~01/MPO/AKRO~|~Reconstruction of SR 261/North Main Street from Olive St to Riverside Dr in the City of Akron. 98273~|~1~|~2~|~02/S<2~|~SmoothsealLOR-254-0.00 to 2.82 98273~|~1~|~1~|~01/NHS~|~SmoothsealLOR-58-16.53 to 20.98LOR-611-5.63 to 8.43 98273~|~1~|~3~|~03/STR~|~SmoothsealLOR-82-0.00 to 5.13 98273~|~1~|~4~|~04/S>2~|~LOR-254-2.82 to 2.83 98273~|~1~|~5~|~05/S>2~|~AC Overlay with Repairs 80/20 Fed/City LOR-10C-0.20 to 0.37 98273~|~1~|~6~|~06/S>2~|~AC Overlay with Repairs 100% City Cost LOR-10C-0.20 to 0.37 109729~|~1~|~1~|~01/NHS~|~Plan split for the NHS locations on BUT-27 112467~|~1~|~1~|~01/NFA~|~Replacement of structure > 20' span. 101078~|~1~|~1~|~01/NFP~|~Pavement Markings 117315~|~1~|~1~|~01/SAF~|~Pedestrian improvements on Coles Blvd in Portsmouth. 117315~|~1~|~2~|~02/S5K~|~Pedestrian improvements along Coles Blvd using Small City Funds. 91936~|~1~|~2~|~02/S>2~|~This plan split is to rehab urban bridge also includes associated roadway approach work. 91936~|~1~|~1~|~01/STR~|~Plan split to rehab rural bridge also includes associated roadway/approach work. 115101~|~1~|~1~|~01/NHS~|~Rock fall maintenance by catchment cleanup and rock fall barrier replacement. 104622~|~1~|~1~|~01/MPO~|~Resurfacing Lovers Lane from W Market St to Parkman Rd and Tod Ave from Parkman Rd to Crestwood Dr in the City of Warren. 93109~|~1~|~1~|~01/S>2/REYN~|~District Preservation Urban Paving - 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing with related work on Lic-US 40-00.00 to 01.39 93109~|~1~|~2~|~02/S>2~|~District Preservation Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-US 40-01.39 to 04.67; 93109~|~1~|~3~|~03/S>2~|~Major 2 Funding - 5MT7(80% Federal) / 4MT7(20% State) - See CAP Comments - Resurfacing with related work on: 1) Lic-US 40-04.67 to 06.14; 93109~|~1~|~4~|~04/STR~|~Major 2 Funding - 5MT7(80% Federal) / 4MT7(20% State) - See CAP Comments - Resurfacing with related work on: 1) Lic-US 40-06.14 to 09.27; 93109~|~1~|~5~|~05/STR/SLSD~|~Southwest Licking School District Local Funding - 4BG7 (100% Local) - See CAP Comments - Construction of two right hand turn lanes and traffic signal to improve access to the school. Includes Alternative Bid to upgrade the Spectrum Radio to the District Standard Intuicom EB-6 Plus 93109~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 90204~|~1~|~1~|~01/ERD~|~Kelleys Island Ferry New Vessel Construction, Erie and Ottawa Counties using Descretionary funding and local match. 102206~|~1~|~1~|~01/STR~|~LAW CR 5 0.17 ER Slide Repair. 111452~|~1~|~1~|~01/CMQ~|~Widening of North Fairfield Road from Lawson Drive to Fairwood Drive from four lanes to five, to provide a center two-way left turn lane. 97991~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation - No CAP - 90% Federal (4PF7)/10% State (4PS7 - deck replacement on LIC-70-7.70 (SFN 4503120) CR 39 over IR 70. 105447~|~1~|~2~|~02/STR~|~Pavement AC Overlay w/Rpr LOR SR 82 5.130 TO 10.060 105447~|~1~|~3~|~03/NHS~|~Bridge Work to be completed per KKapustar comments 105447~|~1~|~4~|~04/STR~|~Bridge Work to be completed per KKapustar comments 105447~|~1~|~1~|~01/NHS~|~Pavement Fine Poly AC Overlay LOR US 20 13.54 TO 15.920 99872~|~1~|~1~|~01/NHS~|~Signals along Monroe corridor in Toledo 105623~|~1~|~1~|~01/SAF~|~Local roadway. 105623~|~1~|~2~|~02/BRO~|~Structure work no eligible for HSP funds. 113255~|~1~|~3~|~03/NFP/KENT~|~100% Kenton items (pav?t repairs, curbs, etc..) 113255~|~1~|~1~|~01/S5K/KENT~|~Resurfacing on SR 309 in the City of Kenton in Hardin County. On both sides of the roads from the beginning of the project to the corporation limits of the City of Kenton at 14.514. On the right side of the road from the corporation limits from where SR 309 enters the City of Kenton on the right side at 14.786 and then on both sides of the road from where SR 309 enters the City of Kenton on the left side to Market Street at 15.864. On both sides of SR 309 from Wayne Street at 16.064 until SR 309 leaves the City of Kenton on the left side at 16.802 and on the left side of SR 309 from 16.847 to the end of the project at the east corporation limits at 16.934. A portion of SR 309 on the east side in this project is only in the City of Kenton on the left side but was annexed in 2006 or later so the City is responsible for both sides. 80% federal funds from the District Preservation Program budget with the 20% non federal match provided by the City of Kenton. 113255~|~1~|~2~|~02/S5K~|~Resurfacing on SR 309 outside the City of Kenton but inside of the Kenton Urban Area. On the left side of SR 309 from the corporation limits from where SR 309 enters in the City of Kenton on the right side at 14.786. On the right side of SR 309 from 16.847 to the end of the project at the east corporation limits at 16.934. Federal and State funds from the District Preservation Program budget. 103425~|~1~|~1~|~01/NFA~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 121395~|~1~|~1~|~01/NFP~|~FY29 103076~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work 94262~|~1~|~1~|~01/NHS~|~FY2016 Urban Paving in the City of Middletown on SR 4 and SR 4D. This plan split is for the 80% ODOT and 20% City items on SR 4 and SR 4D. 94262~|~1~|~2~|~02/NHS~|~FY2016 Urban Paving in the City of Middletown on SR 4 and SR 4D. This plan split is for the 100% City items on SR 4 and SR 4D. 103498~|~1~|~1~|~01/NHS~|~ER event OH16-01 DSR# BEL-004 103498~|~1~|~2~|~02/STR~|~DSR BEL-008 109073~|~1~|~1~|~01/STR~|~GSM Funding - 80% Federal (4SF7) / 20% State (4SS7) - mine grouting on PER-669. 91596~|~1~|~1~|~01/SAF~|~A safety funded project to build a roundabout at LUC CR4 6.17-6.18/ LUC CR39 0-0.1/LUC TR39 0.48-0.49 114817~|~1~|~1~|~01/STR~|~Rural Plan Split 114817~|~1~|~2~|~02/IMS~|~Interstate Plan Split 98548~|~1~|~1~|~01/BRO~|~80% federal w/20% local matching funds for municipal bridge funding eligible work items. 116049~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance 111211~|~1~|~1~|~01/IMS~|~Add fencing to the Jeremiah Morrow bridges (WAR-71-1514L/R) and security camera upgrade. 111211~|~1~|~2~|~02/IMS~|~Correct erosion issues. 95653~|~1~|~1~|~01/MPO~|~Mill and fill Columbus Avenue from Homestead Street to Hayes Avenue (SR 4) in Sandusky Ohio. Project will include utility adjustments and pavement markings. 101093~|~1~|~1~|~01/NHS~|~9 bridges NHS Rural 101093~|~1~|~2~|~02/NHS~|~8 Bridges NHS Urban 101093~|~1~|~3~|~03/STR~|~4 bridges Other Rural 105772~|~1~|~1~|~01/S<2~|~Resurfacing 105772~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded items for the replacement of the waterline within the project limits. 88903~|~1~|~1~|~01/S>2~|~STA SR 297 0.66 to 1.39 88903~|~1~|~2~|~02/S>2/CAN1~|~STA SR 297 1.39 to 2.03 (80/20 split) 88903~|~1~|~3~|~03/S>2/CAN2~|~STA SR 297 1.39 to 2.03 (100% Local) 105314~|~1~|~1~|~01/BRO~|~Acquire and demolish structures required for the western approach to the new Western Hills Viaduct. Remove western plaza to the extent possible while maintaining traffic. Fill and grade the western approach and construct new retaining walls where practical and where they can be constructed in a manner compatible with the design for the future replacement of the viaduct. 113440~|~1~|~1~|~01/NHS~|~Major rehabilitation of 4-lane US 22 in Harrison County. 113440~|~1~|~2~|~02/BRO~|~All bridge rehabilitation work 124057~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 122298~|~1~|~1~|~01/NHS~|~Plan split for bridge rehabilitation work 101587~|~1~|~1~|~01/BRF~|~Bridge replacement work that is County LBR eligible. 121832~|~1~|~1~|~01/NFA~|~installation of EV Charging station at Forest Park Municipal Campus 101638~|~1~|~1~|~01/NHS~|~Complete the stabilization of the Indian Creek stream stabilization. 124710~|~1~|~1~|~01/S>2~|~Plan split to replace state bridge on federal aid system 118118~|~1~|~1~|~01/MPO~|~MPO STBG funds 118118~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope, including asphalt rejuvenating agent. 110923~|~1~|~1~|~01/NHS~|~Install a Culvert Liner. 97912~|~1~|~1~|~01/NFA~|~Culvert replacement in Foster Park, part of the Trumbull County MetroParks system. 101104~|~1~|~2~|~02/S<2~|~100% local funded items and all items over Federal Cap - ie: Pavement repair 101104~|~1~|~1~|~01/S<2~|~SR 64 Urban paving funds 96317~|~1~|~1~|~01/STR~|~STP 80/20 Fed/State. Bridge funding for 7.55 and 10.5 structures 96123~|~1~|~1~|~01/NFP~|~Construction of a new county garage 120420~|~1~|~1~|~01/NFP~|~Established Plan Slit 01/NFP/OT 106997~|~1~|~1~|~01/STR~|~GSMP slide repair TUS-800-26.67. 113537~|~1~|~1~|~01/ENH~|~SRTS items 88565~|~1~|~1~|~01/NHS~|~WOO-420 112667~|~1~|~1~|~01/S<2~|~2" mill and fill with asphalt concrete on: SHE-29 SLM 15.14 to 16.91 114802~|~1~|~1~|~01/STR~|~Rural plan split. 114802~|~1~|~2~|~02/NFA~|~Not on Federal Aid System Plan Split 92215~|~1~|~2~|~02/BRF~|~Bridge Replacement 92215~|~1~|~1~|~01/BRF~|~plan split 120386~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 112846~|~1~|~1~|~01/S<2~|~ASHVILLE-S BLOOMFIELD Urbanized Area - SR752 and SR 316 Locations 112846~|~1~|~2~|~02/S<2~|~DARBYDALE Urbanized Area - SR 762 from 0.00 to 3.01 112846~|~1~|~3~|~03/STR~|~SR 762 from 3.01 to 11.18 95122~|~1~|~1~|~01/STR~|~Culvert/drainage at WIL-6-5.00 97582~|~1~|~1~|~01/NFP~|~Various bridges in D-2. 116318~|~1~|~1~|~01/SAF~|~Construct roundabout at SR309/CR162 100675~|~1~|~1~|~01/STR~|~Resurfacing JEF-150 from Dillonvale to Mt. Pleasant at SLM 11.95, and JEF-647 in Mt. Pleasant from SLM 1.37 to SLM 1.87 100675~|~1~|~2~|~02/S<2~|~Resurfacing JEF-150 from SLM 11.95 to SR 7, and JEF-150A in Rayland from SR 150 to the SR 7 NB Ramps 88443~|~1~|~1~|~01/ERD~|~Federal earmark funding for all work 102415~|~1~|~1~|~01/NHS~|~STA US 30 from 21.55 to 25.84. 117394~|~1~|~1~|~01/NFA/TRCE~|~Superstructure replacement. 82266~|~1~|~1~|~01/S<2~|~Sign Replacement 114294~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8 98300~|~1~|~1~|~01/MPO~|~Mill & fill the north and south thirds of Lake Avenue. 97540~|~1~|~1~|~01/BRF/RIC~|~Ohio Bridge Partnership Program. SFN 7033982 - Hay Rd over unamed branch of Pine Run 97540~|~1~|~2~|~02/BRF/RIC~|~Ohio Bridge Partnership Program. SFN 7031599 - Bellville Johnsville Road over Cedar Fork Creek 82257~|~1~|~1~|~01/IMS~|~100% Federal / Interstate / Signs 100077~|~1~|~1~|~01/NHS~|~Bridge RepairLOR-US-2013.020 SFN 4706609 OVER LOR-20-1303 Reactive Maintenance Bearing reset/repl (025) Conc patch(non-deck) (010) Deck patching(conc) (049) Exp jt repair/repl (048) LOR-US-2015.290 SFN 4701267 OVER LOR-205-0415 CH Preventive Maintenance Deck Sealing (051) Reactive Maintenance Conc patch(non-deck) (010) LOR-US-2015.860 SFN 4703456 OVER LOR-20-1610 Preventive Maintenance Deck Sealing (051) Bridge railing upgrade/repair (061) Reactive Maintenance Bearing reset/repl (025) Exp jt repair/repl (048) LOR-SR-1000.000 SFN 4701410 OVER LOR-20-1612 Preventive Maintenance Deck Sealing (051) Reactive Maintenance Bearing reset/repl (025) Minor Rehabilitation Bridge railing upgrade/repair (061) 96243~|~1~|~1~|~01/S>2~|~Widening of Dayton Drive from 2 to 4 lanes between Maple Avenue and Main Street including new curb and gutter, storm sewer retrofitting, and upgrades to the signal at Dayton Drive and Maple Avenue. In addition, pavement resurfacing from Maple Avenue to Xenia Drive (SR-235). 123427~|~1~|~1~|~01/NHS~|~Resurfacing and repairs on US 22 121445~|~1~|~1~|~01/NHS~|~Plan split for OTT-2 and OTT-53 109646~|~1~|~1~|~01/NFA~|~Resurfacing CAR-524 and JEF-524 109646~|~1~|~2~|~02/STR~|~Resurfacing CAR 542 and COL 164 83138~|~1~|~1~|~01/NHS/GAL~|~Small City Fed 4B97 / District State 4PS7 (4PS7 capped @ $340,000+CE) then fund with Small City Fed 4B97 / City of Galion 4BG7. Small City Funds capped at $2,500,000. 100% City of Galion after caps are met. 83138~|~1~|~2~|~02/BRO~|~Bridge Replacement - CRA-598-0007 / sfn:1703609 115379~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4. 115832~|~1~|~1~|~01/NHS~|~Bridge work - Repairs, overlays or other miscellaneous work 115832~|~1~|~2~|~02/NHS~|~Conduit - Misc Drainage Work 105669~|~1~|~1~|~01/NHS~|~Ohio Rail Development Commission - 900% Federal (4FP7) / 10% General Revenue Fund (4FA7) - TRC is Authorized - No CAP - Rail Crossing Traffic Signal improvements along US Route 22. 106918~|~1~|~1~|~01/SAF~|~plans split 114386~|~1~|~1~|~01/STR~|~Single Course Chip Seal w/Fog Seal on various routes in Cos and Gue counties 113724~|~1~|~1~|~01/SAF~|~High Street at Dayton Street: Install curb extensions at all corners to visually narrow the street and reduce travel speeds, shortening crossing distances at crosswalks and improving visibility of pedestrians to motorists. Dayton Street from Enon Road to Elm Street: Construct a side path together with the existing sidewalk to separate bicyclists from motor vehicles. Upgrade intersection crossings to emphasize pedestrian/bicycle presence. 122886~|~1~|~1~|~01/NFP~|~All work included in this plan split. 92984~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on on: 1) Cos-US 36-00.00 to 16.14; 2) Cos-SR 60-14.51 to 14.61; 92984~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on on: 1) Cos-US 36-16.14 to 16.40; 92984~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-US 36-16.40 to 18.95 83182~|~1~|~1~|~01/NHS~|~It is proposed to perform a "scour correction project" of the right & left bridges over Paint Creek 0.59 mile north of the SR104/Three Locks Road underpass.7100396 District 9 SROSUS00023**C : 9.260 Left 7100426 District 9 SROSUS00023**C : 9.260 Right80% Fed/20% state 01/NHS/BR/State 102763~|~1~|~1~|~01/STR~|~resurface Hen SR 281 102763~|~2~|~2~|~02/STR~|~Hen SR 281 Bridges 111900~|~1~|~1~|~01/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac. 111900~|~1~|~2~|~02/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac. 111900~|~1~|~3~|~03/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac. 111900~|~1~|~4~|~04/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac. 119830~|~1~|~1~|~01/SAF~|~Construct roundabout at the US 62/SR 665 intersection 106562~|~1~|~1~|~01/NFA~|~The Fulton County TID will widen and improve County Road H in Fulton County, near the Village of Delta. Proposed to widen it from 21 feet wide to 26 feet. 116778~|~1~|~1~|~01/IMS~|~RIC IR 0071 19.61 116778~|~1~|~2~|~02/STR~|~WAY SR 0226 05.26. 124501~|~1~|~1~|~01/NFP~|~Created for J&C TID involvement 102118~|~1~|~1~|~01/NFP~|~SFN 4805917 & 6201628 92719~|~1~|~1~|~01/MPO~|~Resurfacing of STate Street from Robinson Avenue to Highland Avenue 119744~|~1~|~1~|~01/NFP~|~Creating Plan Split for TED involvement 113789~|~1~|~1~|~01/NFA~|~Created for J&C involvement 110722~|~1~|~1~|~01/NFP~|~All work in this project. 123462~|~1~|~1~|~01/NFP~|~Provide positive drainage at several locations throughout Franklin County 97224~|~1~|~1~|~01/NHS~|~Intersection improvement project at ATH 550 0.38. NHS route funded 80 federal/20 state. 97224~|~1~|~2~|~02/S<2~|~Intersection improvement project at ATH 13 0.00. Urban other federal aid funded 80 federal/20 state. 123684~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban locations 102046~|~1~|~1~|~01/IMS~|~Spot concrete slab repair at various locations on FRA IR 270 and MAD IR 270 102046~|~1~|~2~|~02/STR~|~Spot concrete slab repair on UNI-739 from 0.59 to 5.94 107995~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge CLI CMDRV 0029 (SFN: 1460057). 97565~|~1~|~1~|~01/IMS~|~Diamond grind and repair concrete pavement on MAH-IR 76 eastbound from SLM 7.05 to 8.65 and MAH-IR 80 from SLM 0.00 to 0.53. Also includes a small quantity in the westbound direction. 92929~|~1~|~1~|~01/IMS~|~Split for all work necessary to repair the slope funded at 90% federal and 10% state. . 102338~|~1~|~1~|~01/STR~|~Microsurfacing SR 9 and SR 171. 93371~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% federal) / 4PS7 (20% State) - No cap - culvert replacements at DEF-127-0211 (SFN 2001985) and DEF-127-0267 (SFN 2002019). 121267~|~1~|~1~|~01/STR~|~All Work Included in this split 118662~|~1~|~1~|~01/NFP~|~District wide systematic RPM replacement project 92068~|~1~|~1~|~01/ERD~|~Plan Split for TRU Warren Riverwalk Bullhead 19415~|~1~|~2~|~02/STR~|~SCI SR823 6.67-10.22 PortsByPass Brdgs added for $11,002,590.00. This includes the Cattle Crossing structure, Brdg SCI-234-0122, Brdg SCI-823-0837L. Brdg SCI-823-0837R, Brdg SCI-823-0917L, & Brdg SCI-823-0917R.80/20/split 19415~|~1~|~1~|~01/STR~|~SCI SR823 6.67-10.22 PortsByPassIt is proposed to construct a new Bypass beginning @ US52 (SR823 SLM 0.00), north and terminate @ US23 (SR823 SLM 16.78).The project includes 5 new interchanges and several new bridges. Portsmouth Bypass was previously programmed under 3 PID's. Phase 1 was originally PID 19415 & now includes all 3 phases and originally began at SLM 6.81, Shumway Hollow Rd. and terminated at SLM 10.13 Lucasville-Minford Rd. Phase 2 was under 79977 and began at SLM 10.13 Lucasville-Minford Rd. and terminated at US23 SLM 16.78 and Phase 3 was under 77366 beginning at SLM 0.00, US52 and terminating at Shumway Hollow Rd. SLM 6.81.80/20 split 19415~|~1~|~3~|~03/STR~|~This is for Non-Construction related items on the Bypass. 122493~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 100828~|~1~|~1~|~01/NHS~|~Replace bridge size Culverts CLI-68-17.97 over Todds Fork and CLI-68-18.08 over a tributary to Todds Fork. 116399~|~1~|~1~|~01/IMS~|~Microsurfacing. 116399~|~1~|~2~|~02/NHS~|~Microsurfacing. 116399~|~1~|~3~|~03/S>2~|~Microsurfacing. 116399~|~1~|~5~|~05/STR~|~Microsurfacing. 116399~|~1~|~4~|~04/S5K~|~Microsurfacing. 103391~|~1~|~1~|~01/STR~|~ndslide repair utilizing a drilled shaft wall with cribbing and pavement repair. ATH 329 5.44. Work length approximately 200 ft. DSR ATH-003. 117638~|~1~|~1~|~01/IMS~|~type A emergency to repair superstructure HAM-275-2123 107357~|~1~|~2~|~02/STR~|~Resurfacing on CR 193 SLM 1.89 to 10.22 107357~|~1~|~1~|~01/S<2~|~Resurfacing on CR 193 from 1.72 to 1.89 - Miami County Engineers/CEAO 102945~|~1~|~1~|~01/STR~|~STP Rural eligible. 88744~|~1~|~2~|~02/NHS~|~Paving on NHS routes as preventive maintenance 88744~|~1~|~1~|~01/IMS~|~Interstate paving for preventive maintenance on various District 11 interstates. 106303~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4. 114220~|~1~|~1~|~01/NHS~|~Bridge rehabilitation > 20' span. 91928~|~1~|~1~|~01/STR~|~D09 Guardrail Project 2014LAW-SR-93 3.250 to 10.500 LAW-SR-93 19.000 to 26.830 LAW-SR-141 9.500 to 10.500 PIK-SR-104 5.500 to 9.000 SCI-SR-125 10.000 to 11.090 SCI-SR-140 6.030 to 7.000 80 Fed/20 state01/STR/OT/State 91928~|~1~|~2~|~02/S<2~|~D09 Guardrail Project 2014SCI-SR-140 0.000 to 6.030 80 fed/20 state02/S<2/OT/State 91942~|~1~|~3~|~03/NHS~|~This plan split is for resurfacing on SR 65 from 6.22 to 7.86. This is a NHS federal aid route. 91942~|~1~|~2~|~02/S<2~|~This split is for resurfacing the portion of SR 65 from 9.58 to 10.19 which is inside the Ottawa Glandorf Urban Area. This is a non NHS federal aid route. 91942~|~1~|~1~|~01/STR~|~This split is for resurfacing SR 12 and the portion of SR 65 from 1.45 to 6.22 and from 10.19 to 15.58 which is outside the Ottawa Glandorf Urban Area. These are non NHS federal aid routes. 111186~|~1~|~2~|~02/IMS~|~Resurfacing. 111186~|~1~|~3~|~03/NFA~|~Resurfacing. 111186~|~1~|~1~|~01/IMS~|~Superstructure replacement. 121300~|~1~|~1~|~01/NFP~|~added GR plan split. 121312~|~1~|~1~|~01/NHS~|~Resurfacing of US-422 121312~|~1~|~2~|~02/STR~|~Resurfacing SR-88 110819~|~1~|~1~|~01/NFA~|~The County will construct 400 linear feet of two 11' wide lanes and install 1,600 cu yd of embankment along Bandy Rd. 124398~|~1~|~1~|~01/S5K~|~Superstructure replacement on SR 768 (SFN 4203917) 113320~|~1~|~1~|~01/S>2~|~Mill and resurface Bellbrook Ave. Full depth repairs where necessary. Sidewalk and curb repair as needed. 120816~|~1~|~1~|~01/S>2/MACE~|~Bridge replacement. 99838~|~1~|~1~|~01/S<2/GRAN~|~LCATS/Village of Granville Resurfacing - 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Resurfacing of CR 118 from 00.00 to 00.50C (Cedar Street from SR 661 (N. Pear ST) to Granger Street; and Welsh Hills Road from Granger Street to the east corporation line). 101399~|~1~|~1~|~01/NHS~|~CLE SR 32 SLM 2.58 to 7.0; full depth repairs approx. 5% 101399~|~1~|~2~|~02/STR~|~WAR SR 123 SLM 12.0 to 16.08 - 2' x 3" x 9 miles partial depth repairs. 101399~|~1~|~3~|~03/S>2~|~WAR SR 123 SLM 16.08 - 17.0 - 2' x 3" x 9 miles partial depth repairs. 109636~|~1~|~1~|~01/NHS~|~Emergency repair on PIK 32 20.20. 103510~|~1~|~1~|~01/STR~|~DSR BEL-008 101568~|~1~|~1~|~01/ENH/NEWA~|~"01/ENH/OT/NEWA" City of Newark TA project - approved for mulit-use trail for fiscal year 2018 with a maxium dollar amount of $261,250 at 95% utilizing TRC 105894~|~1~|~1~|~01/S>2~|~Plan split for urban paving work 105894~|~1~|~2~|~02/S>2~|~Plan split for city work that is not eligible for Urban Paving funds. 93791~|~1~|~1~|~01/SAF~|~This portion of the project is being funded with all ODOT Safety Funds: resurface Westwood Northern Blvd from Sutter to Beekman with open graded friction surface course; install underdrains to address groundwater issues 93791~|~1~|~2~|~02/S>2~|~Resurface Westwood Northern Boulevard from the City of Cincinnati Corp. limit to the intersection of Sutter. This portion is funded $2,654,400 from OPWC, and the remainder will come from the City Capital Fund. 117121~|~1~|~1~|~01/S>2~|~Primary plan split for STBG eligible items - entire project 87133~|~1~|~1~|~01/STR~|~ Rehabilitate bridge CLE-133-2770 (sfn 1303546)by replacing the 13' concrete slab. 111215~|~1~|~1~|~01/NHS~|~Installation of centerline rumble stripes. ATH 33 19.30-25.36 and MEG 33 0.00-2.85. NHS route funded 100% Federal Safety. 117198~|~1~|~1~|~01/MPO~|~Primary Plan Split for STBG eligible streetscape 95709~|~1~|~1~|~01/ERD~|~Resurfacing of Quick Road (CR-41) from the City of Cuyahoga Falls corp line to Akron Peninsula road, Summit County, Ohio. 104285~|~1~|~1~|~01/NFP~|~Pruning and Tree Cutting. 120286~|~1~|~1~|~01/STR~|~Superstructure replacement. MRG 376 6.02, SFN 5801680. Funded 80% Federal/20% State. 109494~|~1~|~1~|~01/SAF~|~Upgrade the intersection of Morse Rd at Babbitt Rd 101450~|~1~|~1~|~01/IMS~|~Added Plan Split description for slope repair. 105244~|~1~|~1~|~01/STR~|~Resurfacing HOL-3 from SLM 0.00 to 4.46 105244~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 86701~|~1~|~1~|~01/NFA~|~0803812 BRO SR763 0.96 Intersect: Trib Of Slickaway Run100% State 01/NFA/BR/State 120103~|~1~|~1~|~01/S>2~|~Shared use path on the south side of Cemetery Road from Britton Parkway to Trueman Boulevard 120103~|~1~|~2~|~02/S>2~|~Aesthetic items added above and beyond the requirements that will be funded entirely by the city of Hilliard. 114888~|~1~|~1~|~01/STR~|~Resurfacing. 114888~|~1~|~2~|~02/STR~|~Minor bridge work 87306~|~1~|~1~|~01/STR~|~general system resurfacing of HAS-151-4.58 to 11.12; includes pavement repairs, pavement marking 96118~|~1~|~1~|~01/NFP~|~Material Storage Shed @ Wheelersburg OutPost 94216~|~1~|~1~|~01/IMS~|~Bridge inspection on IR bridges 94216~|~1~|~2~|~02/NHS~|~Bridge inspection on NHS bridges. 94216~|~1~|~3~|~03/S>2~|~Bridge inspection on Lrg Urban bridges. 114834~|~1~|~1~|~01/STR~|~Items associated with Bridge work. 97741~|~1~|~1~|~01/IMS~|~SFN 5704804, MOT-70-0334, Arlington Pike (C9)-remove and replace deficient bridge deck. Investigate semi-integral abutment conversion. Use SCC mix to patch concrete abutments, piers and wingwalls. Seal concrete surfaces. Paint structural steel. 93468~|~1~|~1~|~01/STR~|~Rural Other Federal Aid COL SR518 mine subsidence repair near SLM 9.8 98564~|~1~|~1~|~01/BRO~|~Plan split for bridge work at 80/20 fed/state. 111952~|~1~|~1~|~01/NHS~|~1 3/4" Mill and Fill with Super-pave in the City of Dayton. 114057~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction costs 104052~|~1~|~1~|~01/S>2~|~Rehab local bridge. 124418~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement 113797~|~1~|~1~|~01/SAF~|~Installation of wrong way signs at various locations along the IR-71/IR-90 Corridors in Cuyahoga County. 99566~|~1~|~1~|~01/NFP~|~Repair and seal spalled abutment joint, install lateral restraint at piers and install abutment end diaphram. In the City of Canton, Stark County, Ohio. 84977~|~1~|~2~|~02/S>2/Stow~|~Plan split to cover concrete reconstruction of approaches to Graham Road bridge over State Route 8. 84977~|~1~|~1~|~01/CMQ/Stow~|~Widening of Graham Road (CR-29) from Bath Road to State Route 8; Adding turn lanes , traffic signal coordination, concrete slab replacement and resurfacing, Summit County, Ohio. 113104~|~1~|~1~|~01/NHS~|~Chipseal on ADA 52 113104~|~1~|~2~|~02/STR~|~Chipseal BRO 756 103705~|~1~|~1~|~01/NFA~|~Athens City Schools improvement project using SRTS funding. Work includes updating curb ramps and installing missing sections of sidewalk on three streets in Athens. The selected streets are between the public library and East Elementary School. Elmwood Place, Watt Street, and Hudson Avenue. 93359~|~1~|~1~|~01/IMS~|~Construct noise walls along I-270 from Broad St to Main St and Main St to Livingston Ave 93359~|~1~|~2~|~02/IMS~|~Costs to repair damage caused by vehicle accidents 118527~|~1~|~1~|~01/NFA~|~Split for bridge removal work. 117330~|~1~|~1~|~01/NFA/MCEO~|~Bridge replacement of MUS-TR 118-1.01 (SFN 6044263) carrying Schoolhouse Road over Wakatomika Creek 90241~|~1~|~1~|~01/SAF~|~Safety & MORPC CMAQ funded intersection project of Gender Rd & Refugee Rd 94138~|~1~|~2~|~02/NFA~|~Resurfacing SR 282 from 0.00 to 2.69. 94138~|~1~|~1~|~01/STR~|~Resurfacing POR SR 44 from 22.14 to 24.05, POR SR 82 from 9.40 to 10.62. 107525~|~1~|~2~|~02/S<2~|~Resurfacing SR 152 from SLM 6.45 to SLM 8.85 107525~|~1~|~1~|~01/STR~|~Resurfacing JEF-152 from SLM 8.85 to 13.87 122121~|~1~|~1~|~01/SAF~|~Install roundabout. 122252~|~1~|~1~|~01/SAF~|~Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. 107969~|~1~|~1~|~01/NFP~|~Smoothseal 119935~|~1~|~1~|~01/MPO/CANT~|~Construction of new bike trail along Colonial Blvd, in the city of Canton. 124859~|~1~|~1~|~01/IMS~|~All work associated with the collision repair of bridge HAM-275-2338L 121740~|~1~|~1~|~01/BRO~|~Rehabilitation of the Sharon Road bridge over Norfolk Southern RR and Sharon Creek (SFN: 3138011) 112656~|~1~|~1~|~01/MPO~|~Resurfacing of Tibbetts-Wick Rd from US 422 to SR 11. 96950~|~1~|~1~|~01/MPO~|~Mill & Fill on Baumhart Road from Garfield (west) to Russia Road. 111646~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes. 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder. 106438~|~1~|~1~|~01/S<2~|~Funding from the Small Cities program. 95% federal. The local match and any overage to be provided by the Village of Ada. 106438~|~1~|~2~|~02/NFP/ADA~|~Water line work on Klingler Road. No federal funds are being used for the work in this event. 115412~|~1~|~1~|~01/NHS~|~Bridge hit repairs. 106073~|~1~|~1~|~01/NFP~|~Replacement of conduit associated with two lighting circuits in the IR77/US30 Interchange in the City of Canton, Stark County, Ohio. 98342~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5. 98342~|~1~|~2~|~02/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Full Depth Repairs and Spot Paving on NOFAS-Rural routes in District 5. 98342~|~1~|~3~|~03/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - Full Depth Repairs and Spot Paving on IMS routes in District 5. 99669~|~1~|~1~|~01/NFA~|~Correct both horizontal and vertical geometric deficiencies at the intersection of CR 22 (Sharpsburg Rd.) and TR 31 (St. Peter Rd.) 116658~|~1~|~1~|~01/STR~|~Culvert Replacement Hocking SR 328 6.23 CFN: 1828466 107609~|~1~|~1~|~01/NFA~|~The City will need to complete the realignment of SR315 intersection on the northbound exit ramp to Olentangy River Rd. 86979~|~1~|~1~|~01/IMS~|~Earthwork, bridge removal of SFN 7705913 SUM IR 76 11.37L Over Spicer Johnston/Abandoned RR. SFN 7705948 SUM IR 76 11.37R Over Spicer Johnston/Abandoned RR. SFN 7703007 SUM IR 76 12.12R over Johnson St and RR 86979~|~1~|~3~|~03/NFA/Akrn~|~Replacement of approximately 200 feet of waterline in the City of Akron, Summit County, Ohio. 100% City of Akron cost. 86979~|~1~|~2~|~02/BRO~|~Plan Split for BR Eligible Bridges SFN 7703031 SUM IR 76 11.27 over Brown Street. 97044~|~1~|~1~|~01/NHS~|~Two Lane Resurfacing 97044~|~1~|~2~|~02/NHS~|~Bridge Work: WAY-250-1.20 / WAY-250-5.05 / WAY-250-7.20 94633~|~1~|~1~|~01/SAF/MtOr~|~It is proposed to install a temporary traffic signal and turn lanes at the intersection of SR32 and Books Malott Road (SLM 4.15).$200,000 @ 100% state from ODOT Jobs & Commerce$169,0000 local match 109492~|~1~|~1~|~01/IMS~|~Repair landslide 97063~|~1~|~1~|~01/ENH~|~Transprotation Alternative Program funded project; 80% fed 4B37 and 20% local LNTP. Rehabilitation of two railroad cars: Steam Engine and Pullman Sleeper. 120943~|~1~|~1~|~01/BRO~|~Plan split for culvert-type bridge replacement. 119203~|~1~|~1~|~01/BRF/TRCE~|~Bridge replacement. 93212~|~1~|~2~|~02/S>2~|~General system paving in the urban func class area:FRA-665: 7.38-9.01, 9.90-10.97, 10.99-11.61, 11.89-12.24, 12.55-12.59, 13.48-14.52 93212~|~1~|~3~|~03/S>2~|~Grove City urban paving in urban func class area:FRA-665: 10.97-10.99, 11.61-11.89, 12.24-12.55, 12.59-13.48 93212~|~1~|~1~|~01/STR~|~General system paving in the rural func class area:FRA-665: 0-7.38 112995~|~1~|~1~|~01/NHS~|~NHS conduits linked 112995~|~2~|~2~|~02/STR~|~conduits linked 86849~|~1~|~1~|~01/SAF~|~90% Federal / 10% State Safety funding split 118981~|~1~|~1~|~01/S>2~|~added plan split. 98831~|~1~|~1~|~01/IMS~|~Split for signal work 98831~|~1~|~2~|~02/SAF~|~Installation of pedestrian refuge islands at two midblock locations along SR-283. 94426~|~1~|~1~|~01/MPO/SPEN~|~Work funded with MPO-STP funds. The use of Toll Credit has been approved. 94426~|~1~|~2~|~02/STR~|~ODOT District preservation funds to be used for costs associated with replacement of the surface course of asphalt on SR117. 114740~|~1~|~1~|~01/STR~|~JAC Chipseal FY25 117438~|~1~|~1~|~01/STR~|~Bridge Replacement (SFN 5132339) 100563~|~1~|~1~|~01/STR~|~Resurfacing on CLE SR 756 0.00 to 2.70 & 7.38 to 11.19 100563~|~1~|~3~|~03/STR~|~Plan Split for the 3 culvert replacements in the project 100563~|~1~|~2~|~02/STR~|~Edge replacement on CLE SR 756 SLM 2.70 to 7.38 using Major 2 funds 100563~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 91864~|~1~|~1~|~01/S>2~|~STP Urban split for pavement on SR 747 between SLM 6.06 to 7.92. 103444~|~1~|~1~|~01/IMS~|~Repair existing steel beams by heat straightening for BEL-70-1572 (SFN 0702498) 124232~|~1~|~1~|~01/ERD/KENT~|~Installation of EV charging stations. 99648~|~1~|~1~|~01/STR~|~Culvert replacement. 101727~|~1~|~1~|~01/ENH~|~01/ENH/OT/TUSC - For TAP eligible work at 95% Federal 5% Local; Federal share includes 15% TRC. 92438~|~1~|~3~|~03/NHS~|~Geotech $'s to repair embankments along various placed on US-35 92438~|~1~|~2~|~02/STR~|~D6 $'s for Drainage and intersection improvements on SR-435 from SLM 0.97-2.3702/STR/OT/ 92438~|~1~|~1~|~01/STR~|~D6 $ for Full depth concrete replacement on SR-435 between I-71 and US-3501/STR/PV/ 92438~|~1~|~4~|~04/STR~|~Geotech $'s to repair embankments at various places along SR-435 92438~|~1~|~5~|~05/STR~|~D6 $'s to replace deck & beams on SFN 2400391, FAY-435-1.05R, over Rattlesnake Run 92438~|~2~|~6~|~06/STR~|~Part 2 Mill & fill SR 435 from 2.37 to 4.08 98162~|~1~|~1~|~01/ENH~|~Project will fill all cracks on bike paths, sealcoat all asphalt sections of paths with an approved agricultural bio-based 101-Agril-Road treatment product, and perform full depth repairs as needed. 96166~|~1~|~1~|~01/NFP~|~Facilities project 109329~|~1~|~1~|~01/SAF~|~District 5 Safety Program Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - See CAP Comments - Intersection improvement at US 62/Beech Road. 109329~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 106159~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 16.62. DSR MRG-006. Rural other federal aid funded 80 federal/20 state. ER funds. 106159~|~1~|~2~|~02/STR~|~Replace culvert MRG 78 16.63 with 80% Federal and 20% State Preservation funds. 102814~|~1~|~1~|~01/NFP~|~All work in projects. 100% state funds from the District Preservation Program budget. 102814~|~1~|~2~|~02/IMS~|~Collision repair work on bridge hit along IR 75 at Bible Road. 113368~|~1~|~1~|~01/IMS~|~Place epoxy overlay on Sawmill Rd structure over IR 270 92337~|~1~|~1~|~01/ENH~|~This split is for work eligible for Transportation Enhancement (TE) funds. The federal TE funds are from the Central Office controlled TE program. 112868~|~1~|~1~|~01/IMS~|~FRA-70 from 0.00 to 3.41 108630~|~1~|~1~|~01/IMS~|~Deck Patching Split 123042~|~1~|~1~|~01/IMS~|~Drainage Block PID. 119165~|~1~|~1~|~01/STR~|~Resurfacing VIN-160-8.92-18.77 106095~|~1~|~2~|~02/S>2~|~100% City of Columbus funding split. 106095~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-23-15.30-16.56 104800~|~1~|~1~|~01/IMS~|~Plan split for barrier and lighting work 115054~|~1~|~1~|~01/BRO~|~Plan split for programming project, update at project scoping. 100170~|~1~|~1~|~01/IMS~|~Various major bridges in D-2 77240~|~1~|~1~|~01/BRF~|~Bridge Replacement with Morrow CountySFN 5930154, MRW-CR146-0.43 over Whetstone Creek01/BRF/BR/ 107704~|~1~|~1~|~01/STR~|~Resurfacing on US 127 using district preservation funds (80% 4PF7 and 20% 4PS7). 93968~|~1~|~1~|~01/IMS~|~Widen and extend exit ramp from IR-275 SB to SR-32 EB including necessary improvements to Old SR-74 structure over IR-275. Relocate Old SR-74 to intersect SR-32 at Bells Lane. Reconstruct SR-32 from west of Mt. Carmel Tobasco to west of Aicholtz (meet Phase 1 improvements). 109594~|~1~|~1~|~01/BRO~|~Major rehabilitation of Hilliard Road Bridge (SFN 1830147) over the Rocky River utilizing federal-aid 95196~|~1~|~1~|~01/IMS~|~Field pave invert of steel culvert with concrete on SFN 1206532 CLA 675 0102. 95196~|~1~|~2~|~02/STR~|~Field pave invert of steel culverts with concrete. SFN 1901745, DAR-118-1450. 91828~|~1~|~1~|~01/S<2~|~Pavement planing adn resurfacing with asphalt concrete in Sidney on SR 47 from East side of the bridge over I 75 (SLM 14.05) to Fourth Street (SLM 14.42). 90812~|~1~|~1~|~01/MPO~|~Upgrade traffic system central software and hardwar; upgrade all traffic signal controllers; upgrade conflict monitors with central system communication capabilities; replace all cameras with upgraded cameras and improved camera communications; upgrade school flashers with LED's; introduce fiber optic redundant links; retrofit traffic signal cabinets with UPS; and retrofit curb ramps per ADA requirements in the City of Kettering. 113910~|~1~|~1~|~01/BRF~|~CEAO Funds 116180~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV/ - 117175~|~1~|~1~|~01/STR~|~Split for pavement work 122907~|~1~|~1~|~01/NHS~|~Major rehabilitation of US 22 in Harrison County 113582~|~1~|~1~|~01/IMS~|~Plan split 1 for GSM funding for slide repair 93645~|~1~|~1~|~01/STR~|~Work on SR 109 in Putnam County from SR 613 to the Henry County line, SLM 5.89 to 11.03. Work on SR 65 in Putnam County from the south corporation limits of the Village of Leipsic to the Henry County line, SLM 15.58 to 22.90. Work on SR 613 in Putnam County from SR 15 to CR 7, SLM 7.26 to 18.46. State and federal funds from the District Preservation Program Budget. No local funds. Rural STP funds. 114061~|~1~|~1~|~01/S<2~|~Mill and fill multiple locations (4B97 Small City Program to provide 95% of the eligible costs, up to a maximum of $1,235,500) 95199~|~1~|~1~|~01/STR~|~Install new and upgrade existing pavement markings on various county roads. 109251~|~1~|~1~|~01/NFP~|~Spot paving on various routes within ATB, MAH and TRU counties. 116323~|~1~|~1~|~01/IMS~|~Plan split for the resurfacing on GRE-675 110015~|~1~|~1~|~01/STR~|~resurfacing on PRE-40 111657~|~1~|~1~|~01/SAE~|~Install roundabout at intersection of US-68 and SR-235 111657~|~1~|~2~|~02/SAF~|~Greene County Water and Sewer work 97796~|~1~|~1~|~01/IMS~|~SFN 5500753, MIA-41-1124 over IR 75 - Replace deck and convert to semi-integral abutments. Patch abutments using-SCC concrete w/anodes. Seal Concrete Surfaces. Re-use exisitng decorative vandal protection fence. Moment plate & splice plate retrofits complete. 103519~|~1~|~1~|~01/S>2~|~FY2020 Urban Paving for the City of Hamilton on SR 129. The limits are 14.35 - 14.71 - SR 129. This plan split is for the items paid at 80% ODOT and 20% City on the STP > 2 route mainly consists of planing, new asphalt overlay and final striping. 103519~|~1~|~2~|~02/S>2~|~FY2020 Urban Paving for the City of Hamilton on SR 129 within the City of Hamilton. The limits are 14.35 - 14.71 - SR 129. This Plan Split is for the items paid at 100% City on the STP >2 route, mainly consists of pavement repair, MOT striping, utility work, curb & gutter and curb ramps. 98308~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair contract in Franklin County 101949~|~1~|~1~|~01/STR~|~Bridge maintenace to linked structure. 109595~|~1~|~1~|~01/IMS~|~IM plan split 120771~|~1~|~1~|~01/MPO~|~to be used for construction of two roundabouts, multi-use path and sidewalk along West Elkton Rd. in Hamilton 98571~|~1~|~3~|~03/S<2~|~STP<200000 Urban Paving - 80/20 Fed/CityRIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - DRIVING LANES RIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - PASSING LANES RIC-42-10.90 (42D, 13S, 1st St) to 10.98 (Diamond St.) RIC-42-10.98 (SR13, S Diamond St) to 11.38 (Park Ave, SR430) RIC-42D-0.00 (US42, Hedges, 2nd St) to 0.11 (S. Adams St) RIC-13S-0.92 (2nd St/Mulberry St) to 1.04 (US42D, Main St) RIC-430 5.69 (Park Ave, US42) to 6.01 (SR39, E. 5th St) 98571~|~1~|~5~|~05/MPO~|~Pedestrian Island. MPO 80% 4TC7 20% Local 98571~|~1~|~6~|~06/MPO~|~Fabric on the outside lanes of the US42 southern section (south of the SR13 intersection) 98571~|~1~|~1~|~01/NHS~|~NHS Urban Paving - 80/20 Fed/CityRIC-42-10.66 (Main St) to 10.90 (42D, 13S, 1st St) 98571~|~1~|~4~|~04/S<2~|~STP<200000 Urban Paving - 100% LocalRIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - DRIVING LANES RIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - PASSING LANES RIC-42-10.90 (42D, 13S, 1st St) to 10.98 (Diamond St.) RIC-42-10.98 (SR13, S Diamond St) to 11.38 (Park Ave, SR430) RIC-42D-0.00 (US42, Hedges, 2nd St) to 0.11 (S. Adams St) RIC-13S-0.92 (2nd St/Mulberry St) to 1.04 (US42D, Main St) RIC-430 5.69 (Park Ave, US42) to 6.01 (SR39, E. 5th St) 98571~|~1~|~2~|~02/NHS/MANS~|~100% City of Mansfield ItemsRIC-42-10.66 (Main St) to 10.90 (42D, 13S, 1st St) 110097~|~1~|~1~|~01/NFP~|~RPM Plan split 92345~|~1~|~2~|~02/NHS~|~General system paving, federal/stateFRA-317: SLM 10.04-10.58 92345~|~1~|~5~|~05/NHS/COL~|~100% Columbus funding for curb ramps, pvmt repair, ped signal items 92345~|~1~|~4~|~04/IMS~|~Bridge deck sealing and patching, 90% fed/10% state2516500 FRA IR70 12.42 Intersect: Over I-70 92345~|~1~|~1~|~01/NHS/COLS~|~Columbus urban paving, federal/local fundingFRA-317: 9.01-10.04, 10.58-10.72, 12.12-13.46 92345~|~1~|~3~|~03/NHS~|~Bridge deck sealing and patching, 80% fed/20% state2516381 FRA US33 9.14 Intersect: Over Us-332516411 FRA SR317 10.57 Intersect: Big Walnut Creek2516470 FRA SR317 12.23 Intersect: Over Ns Rr & Truro Sta Rd 94137~|~1~|~1~|~01/STR~|~Bridge maintenance on SFN 5006163 MAH SR 626 0.22 over Yellow Creek. 94137~|~1~|~3~|~03/S>2~|~Resurfacing MAH SR 626 from 2.26 to 3.51. 94137~|~1~|~2~|~02/STR~|~Resurfacing MAH SR 626 from 0.00 to 1.09 and 1.18 to 2.26. 119800~|~1~|~1~|~01/SAF~|~Safety Funded Plan Spit - 90% 4HJ7 and 10% Local 119800~|~1~|~2~|~02/SAF~|~Plan Split for Carbon Reduction funded scope items, which were applied for through the Transportation Alternatives Program and Safe Routes to Schools programs. 119227~|~1~|~1~|~01/STR~|~Plan split for project to repair bridge size Culvert CLE-133-1324 over Town Run in the Village of Bethel by replacing a portion of the top slab and patching deteriorated areas of concrete. 108101~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS route bridges. 108101~|~1~|~2~|~02/S<2~|~Bridge rehab on small urban route bridges. 108101~|~1~|~3~|~03/STR~|~Bridge rehab on rural route bridges. 115487~|~1~|~1~|~01/NFA~|~Replacement of a single span bridge over Little Raccoon Creek on VIN CR 25 0.19, SFN 8231346. 92603~|~1~|~1~|~01/STR~|~80/20 fed/state funding split fo all work using federal STP funds. 110817~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project. Work includes pavement removal and minor guardrail work. GAL SR 735 0.00-1.41 and GAL 7 26.05-26.25. 100% Federal Ear Mark funds, SAC 4R47. 86718~|~1~|~2~|~02/S<2~|~Urban Paving - 80/20 - District Allocation/City of Ashland 86718~|~1~|~3~|~03/S<2~|~100% City of Ashland Items 86718~|~1~|~1~|~01/STR~|~Resurfacing not withing City of Ashland Corp Limits 107055~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - NO CAP - Annual Project for the Application of Epoxy Pavement Markings District Wide. 93020~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Cos-US 36-26.41 to 33.59 97337~|~1~|~1~|~01/STR~|~RIC-545-04.72 Culvert Replacement 124218~|~1~|~1~|~01/STR~|~STP Rural Bridge Split. 124218~|~1~|~2~|~02/S5K~|~added plan split for STP 5K-49999 bridge SFN 7103301 (ROS-50-19.26) 105393~|~1~|~1~|~01/S<2~|~CO S<2 CV plan split established. 105393~|~1~|~2~|~02/NHS~|~Culvert repair on NHS route. 105393~|~1~|~3~|~03/NFA~|~Culvert repair on non-Federal Aid System. 117988~|~1~|~1~|~01/BRF/BCEO~|~Replacement of Bridge TR 210 0.62 (SFN: 0933511) on a modified alignment. 100553~|~1~|~1~|~01/S>2~|~Plan for the Urban portions of US 22 and Sr 48 that are not NHS routes. These are WAR-48 between SLM 5.23-6.63 and WAR-22 between SLM 5.37-12.75 100553~|~1~|~2~|~02/NHS~|~Plan Split for the NHS portions of SR 48 and US 22. These locationsa re WAR-48 between SLM 6.63-10.08 and WAR-22 between SLM 2.57-5.37 100553~|~1~|~3~|~03/S>2~|~This plan split is for Urban bridge work. 100553~|~1~|~4~|~04/NHS~|~This plan split is for NHS bridge work on this project. 100553~|~1~|~5~|~05/NHS~|~Plan split is for replacing attenuators on the NHS section. 105870~|~1~|~1~|~01/STR~|~funding came from CEAO - CSTP funds transferred from project 85313, Possum Run Rd. 105870~|~1~|~2~|~02/S<2~|~STP Urban 105870~|~1~|~3~|~03/NFA~|~Non-federal aid on minor collector 105870~|~1~|~4~|~04/NFA~|~Non-federally aided portion in corp limit. 105870~|~1~|~5~|~05/NFA~|~Portion of Lex-Springmill that is non-eligible. 102579~|~1~|~1~|~01/S<2~|~THE DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work inside urban areas but outside the cities using STP funds. Work on SR 18 in Hancock County from Fostoria Urban area boundary at 6.46 to the west corporation limits of the City of Fostoria at 6.82. Work on US 68 in Hardin County from the north corporation limits of the City of Kenton at 10.61 to the Kenton Urban Area boundary at 11.06. Work on SR 66 in Allen County from the Delphos Urban Area boundary at 10.14 to the south corporation limits of the City of Delphos at 10.49. Work on SR 117 in Allen County from the Lima Urbanized boundary at 10.75 to Seriff Road at 12.73. District Preservation Program funds. No local funds. 102579~|~1~|~2~|~02/STR~|~THE DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work using rural STP funds. Work on SR 18 in Hancock County from the Wood County line at 0.00 to the Fostoria Urban Area boundary at 6.46. Work on US 68 in Hardin County from the Kenton Urban Area Boundary at 11.06 to the south corporation limits of the Village of Dunkirk at 19.22 and from Washington Street in the Village of Dunkirk at 19.60 to the Hancock County line at 21.80. Work on US 224 from the Indiana State line at 0.00 to TR 77 at 9.26 and from US 127 at 15.85 to the Putnam County line at 25.72. Work on SR 81 in Van Wert County from the east corporation limits of the Village of Elgin at 17.51 to the Allen County line at 21.87. Work on SR 67 in Wyandot County from TR 121 at 18.30 to SR 103 at 25.86. On SR 103 in Wyandot County from SR 119 in the Village of Cary at 7.62 to SR 53 at 12.41. Work on SR 231 in Wyandot County from SR 67 at 20.53 to the Seneca County line at 22.95. Work on SR 66 in Allen County from the Auglaize County line at 0.00 to the Delphos Urban Area Boundary at 10.14. Work on SR 117 in Allen County from the west corporation limits of the Village of Spencerville at 2.01 to the Lima Urbanized Boundary just west of SR 501 at 10.75. Work on US 224 in Putnam County from the Van Wert County line at 0.00 to east of Ralph Street in the Village of Kalida at 12.13. Work on SR 114 in Putnam County from the north corporation limits of the Village of Kalida at 7.58 to US 224 at 8.49. District Preservation Program funds. 102569~|~1~|~1~|~01/STR~|~Work on SR 116 in Van Wert County from SR 117 at 2.51 to the Van Wert Urban Area boundary at approximately 17.85. 102569~|~1~|~2~|~02/S<2~|~Work on SR 116 in Van Wert County from the Van Wert Urban Area boundary at approximately 17.85 to Middle Point Road at 18.15. All funds are from the District Preservation Program budget. There are no local funds. 105385~|~1~|~1~|~01/STR~|~Smooth seal on rural route: LOG SR 508 SLM 1.29 to 9.46 105385~|~1~|~2~|~02/NFA~|~Smooth seal on Non-Federal route: LOG SR 720 SLM 0.00 to 3.15 105385~|~1~|~3~|~03/S<2~|~Smooth seal on small urban routes: LOG SR 720 SLM 3.15 to 5.39 78245~|~1~|~1~|~01/IMS~|~Interstate resurfacing from SLM 0.00 to 3.94 78245~|~1~|~2~|~02/NFP~|~Cost of delivering grindings from pavement planing operation to odot county garage. 121655~|~1~|~1~|~01/S50~|~Abutment rehab 102559~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. HOC 664 15.15-15.90. Urban federal aid system funded 80 federal/20 local. 102559~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using asphalt overlay treatment. HOC 328 1.75-5.93 and VIN 93 7.47-8.75. Rural federal aid system funded 80 federal/20 state. 102559~|~1~|~3~|~03/NFP~|~Hocking Full Service Maintenance Facility parking lot paving. Funded 100% State LBM7. 99952~|~1~|~1~|~01/NFP~|~Split for all structures using state bond funds. 124953~|~1~|~1~|~01/MPO~|~OKI resurfacing program eligible expenses 104979~|~1~|~1~|~01/IMS~|~Reconfigure lane assignments. 110345~|~1~|~1~|~01/SAF~|~CEAO Safety funds plan split 105684~|~1~|~1~|~01/SAF~|~plan split for sidewalk addition along US 42 105684~|~1~|~2~|~02/SAE~|~RRFBs to be installed at 100% Safety funds. 112280~|~1~|~1~|~01/NHS~|~All work in the project. Funding was secured through PROTECT funds. 88831~|~1~|~2~|~02/NFP~|~For work in the rest areas. Rest area funds SAC 4BR7 from ODOT Central Office. 88831~|~1~|~1~|~01/IMS~|~Work on the interstate system. All work in this project is in this split except for work in the rest areas. All funds from the District Preservation Program budget. 93041~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Gue-SR 146-09.92 to 10.56 93041~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Gue-SR 146-00.00 to 09.92 103544~|~2~|~2~|~02/NHS~|~Mill and fill mainline from 14.60 to 30.32 103544~|~1~|~3~|~03/NHS~|~Work on structures: WAY-250-17.31 & WAY-250-18.15 103544~|~1~|~1~|~01/SAE~|~Mill and Fill Buggy Lanes (slm 19.31 to 26.65/27.18 to 30.32) 103544~|~1~|~4~|~04/SAE~|~Safety funds for replacement of Type A End Anchors 123844~|~1~|~1~|~01/IMS~|~Repair FRA-71-17.013 structure and MRW-288-0.073 structure 111255~|~1~|~1~|~01/NFA~|~ODNR - resurfacing inside ODNR park 118229~|~1~|~1~|~01/SAF~|~Plan Split for Safety funds 124407~|~1~|~1~|~01/STR/SOME~|~Pedestrian improvements. 97124~|~1~|~1~|~01/BRF~|~The replacement of SFN6834841. 85093~|~1~|~2~|~02/S<2~|~This split is for the portion of US224 and SR694 inside the Ottawa-Glandorf Urban Area, but outside the village of Ottawa. The point were US 224 enters the Ottawa-Glandorf Urban Area is the west corportation limits of the Village of Glandorf. All of SR 694 being resurfaced with this project is included in this split. All funds in this split are from the District Preservation Program Budget. There are no local funds in this split. 85093~|~1~|~3~|~03/NHS~|~This split is for the portion of US224 inside the Village of Ottawa that is classified as NHS. This section begins at the west corp limit (slm 19.25) and ends at the end terminus of the resurfacing of US224 (RR tracks - slm 21.40). All funds in this split are from the District Preservation Program budget. No local funds are included in this split. 85093~|~1~|~1~|~01/STR~|~This split is for the portion of the project outside the Ottawa-Glandorf Urban Area. The point where US 224 enters the Ottawa-Glandorf Urban Area is the west corporation limits of the Village of Glandorf. No portion of SR 694 being resurfaced in this project is included in this split. All of SR 108 being resurfaced with this project is included in this split. 124587~|~1~|~1~|~01/NHS~|~Plan split for all work on SR-2 93593~|~1~|~1~|~01/SAF~|~realign intersection of SR129/SR177/Eaton Avenue to eilminate offset intersection. Construct new signal as part of work. 79514~|~1~|~1~|~01/ERD/Park~|~Construction of a 2,500 foot towpath trail parallel to State Route 21 in the City of Massillon, Stark County, Ohio. 115509~|~1~|~2~|~02/S5K/CONN~|~Decorative crosswalks. 115509~|~1~|~1~|~01/S5K/CONN~|~Pavement replacement that includes culvert and drainage work, and Alt Bid Items for decorative lighting and signal luminaires. 109082~|~1~|~1~|~01/SAE~|~100% Safety Guardrail plan split 107733~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 7.45-7.50. 100% Federal ER funded. 107733~|~1~|~2~|~02/STR~|~Special MOT operations for Stat Oil Co. with an oversized load. 100% State funds. 117411~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 124548~|~1~|~1~|~01/NFA~|~Created For ODOT TID involvement. 112425~|~1~|~1~|~01/NHS~|~01/NHS/PV/ - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Gue-SR 209-11.53 to 12.85; 2) Gue-SR 209-14.44 to 14.65; 3) Gue-SR 209-14.65 to 15.07; 112425~|~1~|~2~|~02/S<2~|~02/S<2/PV/ - District Preservation 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Resurfacing on Gue-SR 821-05.45 to 05.94; 112425~|~1~|~3~|~03/NHS/CAMB~|~03/NHS/PV/CAMB - District Preservation 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Resurfacing on Gue-SR 821-05.45to 05.94; 110112~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs using Indefinite Delivery Indefinite Quantity (IDIQ) construction project format. 119879~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Scioto River 111070~|~1~|~1~|~01/S<2~|~Project plan split: GSM funds then District Alloc. 120440~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 92030~|~1~|~1~|~01/NFP~|~Split for CO 96798~|~1~|~1~|~01/IMS~|~90/10 Federal State IR Funds (non-BR): FRA-70-15.50 under Ohio Ave.; FRA-70-15.60 under Champion Ave.; FRA-70-15.83 under Linwood Ave. 115175~|~1~|~1~|~01/STR~|~Pavement resurfacing project with shoulder work and pavement markings funded at 80% using (4B77) CEAO CSTP. 122962~|~1~|~1~|~01/NFA/PATA~|~Municipal Bridge Program for the Key Boulevard bridge rehabilitation project in the City of Pataskala (SFN 4564014) 96629~|~1~|~1~|~01/STR~|~Culvert replacement project. VIN 50 and Various. Funded 80 fereral/20 state. 96629~|~1~|~2~|~02/NHS~|~Culvert replacement project. NHS route funded 80 federal/20 state. 96629~|~1~|~3~|~03/NFA~|~Culvert replacement project. Not on any federal aid system funded 100% state. 124314~|~1~|~1~|~01/NFA~|~All work included in this plan split. 117601~|~1~|~1~|~01/NFA~|~delivery & installation of bridge beams/deck 109140~|~1~|~1~|~01/NFA~|~Sidewalk replacement, curb ramp installation, crosswalk striping and signage upgrades around 5 elementary schools in the City of Youngstown. 84296~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 101159~|~1~|~1~|~01/STR~|~Various bridges. 112925~|~1~|~1~|~01/NHS~|~UNI-33 from 24.56 to 25.11. FRA-33 from 0.00 to 0.98. 101357~|~1~|~1~|~01/NFP~|~Bridge cleaning. 109712~|~1~|~1~|~01/IMS~|~Fine poly AC overlay on:MIA-75 SLM 12.75 to 14.15 102860~|~1~|~1~|~01/NHS~|~Resurfacing NHS routes 102860~|~1~|~2~|~02/STR~|~Resurfacing STP Rural routes with asphalt 93295~|~1~|~1~|~01/MPO~|~80% federal / 20% local funding split using MPO STP funds for the resurfacing of Hubbard Road. 116663~|~1~|~1~|~01/IMS~|~plan split work for geotech work 124956~|~1~|~1~|~01/MPO~|~Repaving Deerfield Road on federal aid system 124956~|~2~|~2~|~02/NFA~|~Plan split for 100% locally funded, non federal aid system, items 94603~|~1~|~1~|~01/NFP~|~New Fulton County FSMF - 100% State Funds 87058~|~1~|~1~|~01/NHS~|~priority system minor rehab. on TUS-250-21.32 to 21.86: concrete pavement repairs and pavement marking 117230~|~1~|~1~|~01/MPO/CIN~|~Demolition of the Chem Pack structure. 105794~|~1~|~1~|~01/STR~|~Landslide repair using Rock removal treatment. MEG 124 32.23-32.33. STP rural Federal route using 100% Federal ER funds. 116352~|~1~|~1~|~01/STR~|~Resurfacing TUS-39 from SLM 0.71 to SLM 2.94 & SLM 7.35 to SLM 8.81 116352~|~1~|~2~|~02/S<2~|~Resurfacing TUS-39 from SLM 8.81 to SLM 10.24 & TUS-211 from SLM 0.00 to SLM 0.05 124936~|~1~|~1~|~01/STR~|~Plan Split for resurfacing of Other Federal Aid Rural route 97622~|~1~|~2~|~02/STR~|~Resurfacing SR 170 from SLM 2.56 to SR 154, including pavement repairs and pavement markings. 97622~|~1~|~1~|~01/S<2~|~Resurfacing SR 170 from SLM 1.72 to SLM 2.56, including pavement repairs and pavement markings. 108155~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: DEL-37-8.27-8.36, 8.51-8.62 & 8.66-9.18 DEL-42-5.15-5.20 & 5.35-6.90 118976~|~1~|~1~|~01/STR~|~Plan Split for CSTP funding 76470~|~1~|~1~|~01/STR~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Gue-SR 800 from the 0.00 to the 2.48 76470~|~1~|~2~|~02/NHS~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing of Gue-US 22-15.16 to 31.04 81769~|~1~|~1~|~01/ERD~|~ Widen mainline US 27 from Oxford south corp to Chestnut Street to preferred design standards including increased shoulder width, horizontal and vertical curvature considerations, lane width deficiencies, and need for center turn lane provision at all major access points; upgrade signalized intersections to preferred design standards and determine the need for turn lanes on all approaches. City of Oxford 81769~|~1~|~2~|~02/ERD~|~Plan Split for total structure replacement over Collins Creek due to the mainline widening. Bridge BUT-27-1491, SFN: 0900788 25619~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 94316~|~1~|~1~|~01/S<2~|~From SLM 17.09 to SLM 20.19 94316~|~1~|~2~|~02/STR~|~HEN-65-18.28 91146~|~1~|~1~|~01/IMS~|~FRA-70 from SLM 0.00-3.41 pavement repairs 91146~|~1~|~2~|~02/NHS~|~Spot pavement repairs on US 23 117708~|~1~|~1~|~01/NFA~|~Pedestrian bridge repairs 119065~|~1~|~1~|~01/MPO/LOVE~|~Installation of a traffic signal at the Little Miami Scenic Trail crossing of West Loveland Avenue. 119065~|~1~|~2~|~02/SAE~|~Section 130 funding, railroad safety improvements, city of Loveland preemption interconnecting to ODOT pedestrian signal project. 122202~|~1~|~1~|~01/SAF~|~Safe Routes to Schools funding 105779~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid 104844~|~1~|~1~|~01/MPO~|~Construction of an on-ramp from southbound Mason-Montgomery Road to southbound IR-71. 104844~|~1~|~2~|~02/ENH~|~Plan split for construction of sidewalk along the west side of Mason-Montgomery Road from Escort Drive to the existing sidewalk constructed under PID 84731. 104844~|~1~|~3~|~03/MPO~|~This plan split will include all work associated with constructing a new bridge for the proposed ramp. 104844~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 100343~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. Federal funds are rural STP. 105599~|~1~|~1~|~01/STR~|~Rural plan split 121371~|~1~|~1~|~01/NFP~|~FY28 Design Holder 98623~|~1~|~1~|~01/BRF~|~OBPP SFN 4734653 bridge replacement 123562~|~1~|~1~|~01/SAE~|~Plan Split for interstate locations. Routes TBD 122985~|~1~|~1~|~01/STR~|~bridge plan split. 117960~|~1~|~1~|~01/SAF~|~Plan split for guardrail maintenance 117960~|~1~|~2~|~02/BRO~|~Bridge hit 116694~|~1~|~1~|~01/STR~|~Rural sections of SR 235 and SR 309. 116694~|~1~|~2~|~02/S5K~|~Microsurfacing work on SR 309 within the Kenton Urban Area. 122367~|~1~|~1~|~01/NHS~|~Bridge Maintenance, Major Bridge 122367~|~1~|~2~|~02/NFP~|~Part code for Alt items - fence. 86589~|~1~|~1~|~01/NFA~|~TAP Funding--All aggregate paths from site entrance to south end, all concrete sidewalks from site entrance to roundhouse area, (2) boardwalks and (1)overlook over bioswale with railing, boardwalk at launch drop off area and aggregate trail down to launch area. 86589~|~1~|~2~|~02/NFA~|~Gas Tax--All asphalt paving with concrete curbs, cobble special paving, storm sewer drainage system 117831~|~1~|~1~|~01/NFP~|~Created for J&C involvement 119857~|~1~|~1~|~01/IMS~|~Geotech Project. 119790~|~1~|~1~|~01/S>2~|~added plan split. 91909~|~1~|~1~|~01/NFP~|~100% state ODNR funding for resurfacing at headquarters01/NFP/PV/ 84743~|~1~|~2~|~02/S<2~|~Microsurfacing / CRA-019-04.20 - 04.82 Galion urbanized area and CRA-019-12.05 - 12.26 Bucyrus urbanized area 84743~|~1~|~1~|~01/STR~|~Microsurfacing / Rural Segment 04.82 -12.05 110660~|~1~|~1~|~01/NHS~|~All the work to resurface the road is in this plan split. Federal and state funds from the District Preservation Program budget. No local funds. 121170~|~1~|~1~|~01/NFP~|~Crack Seal plan split. 106031~|~1~|~1~|~01/NFP~|~Split for work on the Type A Emergency 121414~|~1~|~1~|~01/MPO~|~Federal items. 105151~|~1~|~1~|~01/BRO~|~All work in the project. All funds from the District Preservation Program budget. No local funds. 116285~|~1~|~1~|~01/NFP~|~Fence maintenance/repair. 123944~|~1~|~1~|~01/STR~|~emergency slide repair. 112838~|~1~|~1~|~01/STR~|~Crack sealing various routes in District 11. 92472~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 81249~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehab backwalls and other repairs on 1) 6001955 MUS IR70 11.43 Intersect: Ramp A Over Ramp H; BR Eligible for Rehabilitation: Length=99 SD/FO(1) SR=44.8 DSR=5; 2) 6003036 MUS IR70 13.06 Intersect: I-70 Over Abandoned Rr; BR Eligible for Rehabilitation: Length=119 SD/FO(1) SR=59 DSR=6; 117129~|~1~|~1~|~01/MPO/BTWP~|~Resurfacing of Orchard Road, Yellowbrick Road, and Factory Road. 117129~|~1~|~2~|~02/NFA/GCEO~|~Split for reconstruction work on the portion of TR 1217 that is not on the federal-aid system. 114530~|~1~|~1~|~01/SAE~|~Construct new mast arm signal with back plates, supplemental signal heads and lighting. 81314~|~1~|~2~|~02/SAF~|~The funding event CO CO Contr 07 (using ARC funds (SAC 4D37)) and funding event CO CO Contr 08 (using district preservation funds) are to be used to fund the traffic signal items 81314~|~1~|~1~|~01/NHS~|~This plan split is for all pay items except for the traffic signal pay items (see plan split #2) to improve the flow of traffic from SR 7 & University Blvd intersection to US 22 in the city of Steubenville. 81314~|~1~|~3~|~03/S<2~|~Purchase of 24" Steel Casing Pipe as a change order 81314~|~1~|~4~|~04/S<2~|~Change order funds for the marina bike path upgrade. 98228~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (90% Federal)/4PS7 (20% State) - NO CAP - Annual Contract for Fast Dry Pavement Markings including Auxiliary markings on specified Interstate Routes 98228~|~1~|~4~|~04/STR~|~District Preservation - 4PF7 (80%)/4PS7 (20%) - NO CAP - Annual Contract for application of Fast Dry Pavement Makings and auxiliary markings on specified OFAH-Rural routes. 98228~|~1~|~5~|~05/NFA~|~District Preservation - 4PS7 (100% State) - No CAP - Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified NOFAS-Rural routes 98228~|~1~|~6~|~06/S>2~|~District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - NO CAP - Annual Contract for Fast Dry Pavement Markings including Auxiliary markings on selected OFAH-Columbus routes 98228~|~1~|~2~|~02/NHS~|~District Preservation - 4PF7 (80% Federal)/4PS7 (20% State) - NO CAP - Annual project for replacement of Fast Dry Pavement Markings including Auxiliary Markings on specified D-05 NHS Routes 98228~|~1~|~3~|~03/S<2~|~District Preservation - 4PF7 (80% Federal)/4PS7 (20% State) - NO CAP - Annual project for replacing Fast Dry Pavement Markings including Auxiliary markings on selected D-05 OFAH-Urban routes. 97379~|~1~|~1~|~01/ENH~|~Install decorative LEP lighting on Monument Avenue Bridge (SFN 5760631) over the Great Miami River 104637~|~1~|~1~|~01/IMS~|~Rehabilitation of three structures (LIC-70-10.77, LIC-70-20.99, and LIC-70-23.20) along IR 70 in Licking County. 17585~|~2~|~2~|~02/NFP~|~City of Dublin 100% local funding to improve intersection of Sawmill/Hard Roads. Local Sponsor - Part 2 - City of Dublin 17585~|~1~|~1~|~01/MPO~|~MORPC STP funding to widen CR61/Hard Rd from Sawmill Rd to Smoky Row RdLocal Sponsor - Columbus 108829~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 108829~|~1~|~3~|~03/STR~|~Replacing culverts. 108829~|~1~|~1~|~01/NHS~|~Replacing culverts. 116701~|~1~|~2~|~02/STR~|~STP Rural Plan Split 116701~|~1~|~1~|~01/S5K~|~Marion Urban Area and Ashville-S Bloomfield Urban Area Plan Split 116701~|~1~|~3~|~03/IMS~|~Interstate plan split. 116701~|~1~|~4~|~04/NHS~|~NHS plan split 116701~|~1~|~5~|~05/S>2~|~STP > 200,000 plan split 107454~|~1~|~1~|~01/NHS~|~AC Overlay without repairs 107454~|~1~|~2~|~02/NFA~|~AC Overlay without repairs 112584~|~1~|~1~|~01/NHS~|~FRA-33 from 21.91 to 24.27 110216~|~1~|~1~|~01/MPO~|~All the work in this projects. Pedestrian facilities. Part of ADA plan. 100% federal funds using MPO-STP funds and Toll Revenue Credt until the cap is reached. Any funds needed over the cap are the responsibility of the Village of Lafayette. 110084~|~1~|~1~|~01/SAF~|~Raised pavement marker project throughout the District 96135~|~1~|~1~|~01/NFP~|~Pole Building at the Lawrence County ODOT Garage 107572~|~1~|~1~|~01/SAF~|~Raised Pavement Marker project for FY2024. 100% State funded. 116682~|~1~|~1~|~01/STR~|~This split is for the portion of SR694 that is outside the Ottawa-Glandorf urbanized area. 116682~|~1~|~2~|~02/S5K~|~Resurfacing inside of the Ottawa-Glandorf Urban Area. Although the work is inside of Glandorf, as Glandorf is a village they will not be providing funds. All funds will be from the District Preservation Program budget. 13484~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split using federal funds for bridge work 13484~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 122047~|~1~|~1~|~01/STR~|~Construct roundabout at the intersection of PIC-752 and PIC CR 7 (Walnut Creek Pike) 107587~|~1~|~1~|~01/S<2~|~JAC 124 17.55-17.76 107587~|~1~|~2~|~02/STR~|~JAC 124 17.76-23.97 107587~|~1~|~3~|~03/STR~|~Bridge pm 124505~|~1~|~1~|~01/STR~|~Various improvements on SR 61 97094~|~1~|~1~|~01/NFP~|~Signals maint project 116927~|~1~|~1~|~01/NHS~|~Replace lifting cables on high mast lighting. 105356~|~1~|~1~|~01/STR~|~AC overlay without repairs 101939~|~1~|~2~|~02/IMS~|~This funding event is for all work relative to the HAM-71-0154E bridge which is the entrance ramp from 5th street to northbound I-71 that begins at the rear abutment and ends at the first immediate expansion joint. 101939~|~1~|~1~|~01/IMS~|~This plan split is for the rehabilitation of the Major Bridge HAM-71-0159 includes all bridge work, MOT and approach work (surface course, necessary for the bridge rehabilitation work). All roadway upgrade work not necessary for the bridge rehab and work on the HAM-71-0154E bridge shall be included in separate plan splits. 101939~|~1~|~3~|~03/IMS~|~This plan split is for roadway costs that are the District's responsibilities that are not associated to the bridge work. This includes the intermediate course replacement, sign upgrades, ets. 88916~|~1~|~1~|~01/S>2~|~Resurfacing TRU SR 193 0.00 to 5.37. 88916~|~1~|~2~|~02/STR~|~Resurfacing TRU SR 193 5.37 to 6.78 88916~|~1~|~4~|~04/STR~|~See linked structure > 20' span. 88916~|~1~|~3~|~03/S>2~|~See linked structure 10' to 20' span. 98227~|~1~|~3~|~03/S<2~|~District Preservation - 4PF7 (80% Federal)/ 4PS7 (20% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on pavements OFAH-Urban 98227~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (90% Federal)/ 4PS7 (10% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on Interstate Routes 98227~|~1~|~2~|~02/NHS~|~District Preservation - 4PF7 (80% Federal)/ 4PS7 (20% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified NHS routes 98227~|~1~|~4~|~04/STR~|~District Preservation - 4PF7 (80% Federal)/ 4PS7 (20% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified OFAH-Rural routes 98227~|~1~|~5~|~05/NFA~|~District Preservation - 4PS7 (100% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified NOFAS-Rural routes 102483~|~1~|~1~|~01/STR~|~Microsurfacing of HOL-83 119422~|~1~|~1~|~01/BRF~|~Bridge replacement 115995~|~1~|~1~|~01/NFA~|~Bridge replacement 81712~|~1~|~1~|~01/BRF~|~Replace existing bridge (HOL-520-0644, SFN 3802701) with a new multi-span steel beam bridge. 120081~|~1~|~1~|~01/NFA~|~ODNR Resurfacing of Pickerel Creek Wildlife Area 106509~|~1~|~1~|~01/S<2~|~Marietta City Schools improvement project using SRTS funding. Work includes the reconstruction of a traffic signal, sidewalk widening, new crosswalk markings, ADA compliant curb ramp replacement, and new bike racks. Funded 80%/20% Local (using TRC). 94405~|~1~|~1~|~01/S<2~|~Resurfacing RIC-42-3.48 to 7.22. 94405~|~1~|~2~|~02/S<2~|~Bridge Work on Structure RIC-42-0431 112394~|~1~|~1~|~01/STR~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 102475~|~1~|~1~|~01/STR~|~Minor Rehab of pavement on BEL-331 & HAS-331 105860~|~1~|~3~|~03/NHS~|~Dominion East Ohio gas line work. 105860~|~1~|~1~|~01/NHS~|~Deck replacement >20' span. 105860~|~1~|~2~|~02/NHS~|~Installation of partial interchange lighting at the State Route 5/14/44 interchange in Portage County. 105860~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 100426~|~1~|~1~|~01/NFA~|~HIG 321 0.00-5.74 100426~|~1~|~2~|~02/STR~|~HIG 321 5.74-9.07 100426~|~1~|~3~|~03/STR~|~Bridge pm. 112992~|~1~|~1~|~01/STR~|~Culvert rehab 95074~|~1~|~1~|~01/S<2~|~District 5 Geological Site Management Program Funding - 4SF7 (80% Federal) / 4SS7 (20% State) - See CAP Comments - Rock Scaling on LIC-SR 13-07.82 to 07.92 115866~|~1~|~1~|~01/SAE~|~Pavement marking project on various County routes 109972~|~1~|~2~|~02/SAE~|~Install Amish buggy signs and detection system on SR-320 in Preble County 109972~|~1~|~1~|~01/SAF~|~District wide signal contract. 114856~|~1~|~1~|~01/IMS~|~Repair transverse joints prior to PID 88679 in 2024 112612~|~1~|~1~|~01/ENH~|~Installing sidewalks on High St NE and Willow Dr NE in Howland Township. 114409~|~1~|~1~|~01/SAF~|~Split for project eligible work. 114409~|~1~|~3~|~03/NFP~|~Split for project non-eligible work. 114409~|~1~|~2~|~02/MPO~|~Split for MPO eligible work for resurfacing SR 87 from IR-271 ramps to Orange Place. 101217~|~1~|~1~|~01/NHS~|~NHS Eligible portion (US 224). 124938~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing Other Federal Ais Urban roadway with District preservation. 96923~|~1~|~1~|~01/S>2~|~New signal at IR-680 @ SR-164 Northbound ramp. Revise striping, guardrail, and overhead signs. Beaver Township, Mahoning County, Ohio. 82421~|~1~|~1~|~01/IMS~|~Overlay on Interstate routes: MOT IR 75 SLM 18.24 to 19.89MOT IR 75 SLM 19.89 to 20.79MOT IR 75 SLM 20.79 to 21.42MOT IR 70 SLM 15.53 to 17.34Repairs and resurfacing of Airport Access Road.MOT IR 70 SLM 14.00 to 15.00 118782~|~1~|~1~|~01/NFP~|~Asphalt Concrete Overlay 118782~|~1~|~2~|~02/BRO~|~Bridge Work FY 2029 in General System as a Block Out. 99546~|~1~|~2~|~02/S<2~|~STP < 200000 Culvert: ASD-511-16.89 99546~|~1~|~1~|~01/NHS~|~NHS Culvert: ASD-42-6.11 110650~|~1~|~1~|~01/S5K~|~Resurfacing. 110650~|~1~|~2~|~02/S5K~|~Minor bridge rehab > 20' span. 111388~|~1~|~1~|~01/SAF~|~Project to connect existing bike-way in Vandalia. 105364~|~1~|~1~|~01/NHS~|~AC overlay without repairs on:MER US 33 SLM 16.02 to 18.57 109927~|~1~|~1~|~01/SAF~|~Federally eligible 123620~|~1~|~1~|~01/IMS~|~Plan split for Interstate 98063~|~1~|~1~|~01/IMS~|~Split for work on this project 84585~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 145 8.94-12.39. Rural other federal aid funded 80 federal/20 state. 92263~|~1~|~1~|~01/STR~|~Culvert Construction/Repair 22213~|~1~|~1~|~01/BRO~|~Plan split for federal eligible work to replace the Harvard Rd bridge: 1806459; CUY-077-12.12 22213~|~1~|~2~|~02/NFP~|~Split for work at 100% local cost. 22213~|~1~|~3~|~03/BRO~|~Split for work to relocate CEI power lines 22213~|~1~|~4~|~04/BRO~|~Split for work to relocate Charter Communications 103541~|~1~|~1~|~01/NFA~|~The county is improving and widening nearly one mile of CR34 form CR15 to Twp. Rd. 75 near Old Fort to support the growth at the Church & Dwight Facility. 87116~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. NOB 340 7.01-7.08. Urban funded 80 Federal/20 State. 87116~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GUE 340 1.59-2.45 and NOB 340 0.71-7.01. Rural other federal aid funded 80 Federal/20 State. 87116~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 555 15.33-22.94 and PER SR 555 0.00-0.33. Not on federal aid system. 100% State funded. 87116~|~1~|~4~|~04/SAF~|~Installation of transverse rumble stripes on NOB 340 6.85-7.07. Funded 90% Federal/10% State. 93924~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2016. Various routes and sections in D10. Funded 100% state. 117496~|~1~|~1~|~01/BRF/BCEO~|~Replacement of the existing bridge superstructure, repaving approach pavement, upgrade to existing guardrail. 95630~|~1~|~1~|~01/IMS~|~Emergency project to remove a damaged pedestrian bridge using 100% State funds. 112491~|~1~|~1~|~01/NHS~|~Resurfacing 94576~|~1~|~1~|~01/NFP~|~Pavement markings via work order throughout six District 4 counties. 123777~|~1~|~1~|~01/STR~|~STP 89159~|~1~|~1~|~01/BRO/MCEO~|~CEAO Bridge Funding - 4B87 (80% Federal) / LNTP Bridge Credit (15% Local) plus LNTP (5% Local) - Replacement of SFN 6035256 MUS CR 7 05.18 Intersect: Brush Creek; BR Eligible for Replacement: Length=57 SD/FO(1) SR=30.0 DSR=4 115930~|~1~|~1~|~01/NHS~|~Replace deficient storm sewer segment along US 224 80674~|~1~|~1~|~01/ERD/MCE~|~Widen Western Reserve Road (CR-32) including TWLTL from Hitchcock Road to State Route 7 in Mahoning County, Ohio. 80674~|~1~|~2~|~02/S>2~|~Sanitary/sewer/drainage work along State Route 7. 80674~|~2~|~3~|~03/MPO/MCE~|~Widening of Western Reserve Rd between SR 7 and South Ave by adding TWLTL and right turn lanes at three locations. 114987~|~1~|~1~|~01/STR~|~Pruning Contract. 109992~|~1~|~1~|~01/S>2~|~Culvert replace or rehab 111405~|~1~|~4~|~04/IMS~|~Widening for new lane. 111405~|~1~|~3~|~03/IMS~|~Bridge reconstruction of approach slabs for existing lanes and minor bridge work. 111405~|~1~|~2~|~02/IMS~|~Widening for new 3rd lane of IR-77 from Everett Road to SR 21 in Summit County, Ohio. 111405~|~1~|~5~|~05/S>2~|~Culvert replacements. 111405~|~1~|~1~|~01/IMS~|~Reconstruction of existing lanes, includes culverts. 109670~|~1~|~1~|~01/IMS~|~Slide repairs along I-76 from 20.05 to 20.25. 109670~|~1~|~2~|~02/IMS~|~Minor culvert work. 93916~|~1~|~2~|~02/NFP~|~SR-65 work outside pavement and deeper than 3.5" (full depth pavement repairs, curb, curb ramps, sidewalks,...) from SLM 1.79 to SLM 2.37. 93916~|~1~|~1~|~01/S>2~|~SR-65 from Earl (SLM 1.79) to Woodville Rd (SLM 2.37) work between curbs to a depth of 3.5". 102809~|~1~|~1~|~01/SAF~|~Upgrade the existing traffic signal hardware at the intersection of US 30 and SR 9/CR 406 in the Village of Hanoverton. 94446~|~1~|~1~|~01/BRO~|~All bridge work eligible for federal BR funds at 80/20 fed/state split 93042~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Cos-SR 60-00.00 to 14.61; 2) Mus-SR 60-34.76 to 35.51; 109775~|~1~|~1~|~01/S<2~|~AC Overlay without repairs 109775~|~2~|~2~|~02/STR~|~Resurface US 40 in Clark County with asphalt concrete. 90356~|~1~|~1~|~01/STR~|~Culvert Replacement 107342~|~1~|~1~|~01/NFA~|~D09 PM FY2024 (B) 101291~|~1~|~1~|~01/NHS~|~SAN-20 & WOO-20 101291~|~2~|~2~|~02/S>2~|~Plan split for all work on WOO-65 123746~|~1~|~1~|~01/NFP~|~District-wide systematic RPM replacement project 124815~|~1~|~1~|~01/SAF/HOL~|~Pavement marking project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%. 117612~|~1~|~1~|~01/BRF~|~Bridge rehab. 98848~|~1~|~1~|~01/NHS/SAL~|~Signal or flasher pole replacement on the NHS 98848~|~1~|~2~|~02/S<2~|~Signal or flasher pole replacement on the Non-NHS but on State Routes 98848~|~1~|~3~|~03/S<2~|~Signal or flasher pole replacement on the Local route 95817~|~1~|~1~|~01/NHS~|~Urban paving eligible items. 95817~|~1~|~2~|~02/NFP~|~urban paving ineligible items. 95817~|~1~|~3~|~03/SAF~|~Safety plan split 95936~|~1~|~1~|~01/NFA~|~OEPA 106989~|~1~|~1~|~01/STR~|~GSMP slide repair. 101318~|~1~|~1~|~01/IMS~|~Paving work on interstate. 113093~|~1~|~1~|~01/NHS~|~Resurfacing. 113093~|~2~|~4~|~04/NHS~|~Superstructure replacement. 113093~|~1~|~2~|~02/STR~|~Bridge preventive maintenance > 20' span. 113093~|~1~|~3~|~03/STR~|~Bridge preventive maintenance 10' to 20' span. 80541~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for pavement replacement and and addlane. 112799~|~1~|~2~|~02/NFP/GRAN~|~100% Local Plan Split for Federal funding ineligible items 112799~|~1~|~1~|~01/CMQ/GRAN~|~Construction of roundabout at SR 661 and New Burg Street to reduce left turn queues. 94820~|~1~|~1~|~01/SAF~|~Replace roadway markings on all 305 miles of roadways in Clark County. 76749~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 121611~|~1~|~1~|~01/MPO~|~Plan Split for CRP eligible scope. 100458~|~1~|~1~|~01/S<2~|~Installation of sidewalk and curb ramps on Gettysburg Avenue and painting and upgrading lighting on the US 35 bridge over Gettysburg Avenue. 121433~|~1~|~1~|~01/STR~|~Pavement repair STP rural 121433~|~1~|~2~|~02/S5K~|~Resurfacing 93739~|~1~|~1~|~01/SAE~|~Install sidewalk with curb and gutter and ADA curb ramps along Gardenia Avenue, Warren Avenue, Carnation Drive, Poppy Drive, Primrose Drive, Magnolia Drive and Laurel Drive. Carnation: Defiance ST to Gardenia Ave Magnolia: Gardenia to Laurel Primrose: Existing sidewalk to Laurel Poppy: Laurel to Gardenia Warren: Existing sidewalk to Poppy Laurel: Magnolia to Poppy 111234~|~1~|~1~|~01/SAE~|~Construction Plan Split for Pavement Markings 124640~|~1~|~1~|~01/SAF~|~Upgrade pavement markings 120455~|~1~|~1~|~01/STR~|~Culvert replacement. 120455~|~1~|~2~|~02/NFA~|~Culvert replacement. 80076~|~1~|~4~|~04/NHS~|~'04/NHS/PV/ " - Undetermined (80% Federal) / (20% State) - No CAP - New pavement construction on: 1) Lic-SR 79-04.54 to 04.92; 80076~|~1~|~3~|~03/S<2~|~'03/S<2/PV/ " - Undetermined (80% Federal) / (20% State) - No CAP - New pavement construction on: 1) Lic-SR 79-03.83 to 04.14; 80076~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - Undetermined (90% Federal) / (10% State) - No CAP - Replacement of 4504747 Lic SR79 4.36 Intersect: IR 70 #; BR Eligible for Replacement: Length=255 SD/FO(1) SR=78.0 DSR=4 80076~|~1~|~2~|~02/IMS~|~'02/IMS/PV/ " - Undetermined (90% Federal) / (10% State) - No CAP - New pavement construction on: 1) Lic-IR 70-13.67 to 16.09; 2) Lic-SR 79-04.14 to 04.36; 3) Lic-SR 79-04.40 to 04.54; 117358~|~1~|~1~|~01/BRF~|~Bridge rehabilitation. All work is included in this plan split. 105347~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 6: Construction of a new bridge over the Mill Creek, south of the WHV to provide contractor access for future construction. In addition, relocation of the bypass track on the east bank of the Mill Creek further east, to create space on the east bank of Mill Creek for the future construction of a long-span bridge tower without the need to cross any rail tracks. 113735~|~1~|~1~|~01/SAF~|~Construct a roundabout at CR13 (Worthington Road) & CR106 (Lewis Center Road) 121012~|~1~|~1~|~01/NFA~|~Plan split to resurface in Hueston Woods State Park 97489~|~1~|~1~|~01/NHS~|~Project is to replace bridge HAS-250-0081 (SFN 3401472) with a new single span structure. 112895~|~1~|~2~|~02/STR~|~UNI-36 from 0.00 to 1.74 112895~|~1~|~1~|~01/NHS~|~UNI-36 from 1.74 to 4.43 and UNI-4 from 0.00 to 2.57 116375~|~1~|~1~|~01/CMQ~|~Project's primary Plan Split for CMAQ funded scope 116375~|~1~|~2~|~02/NFA~|~Plan Split for 100% locally funded scope items, including items that would otherwise be addressed by a '"cost to cure" during RW process. 112560~|~1~|~1~|~01/MPO~|~NOACA funded rehabilitation of Rittman Road 102059~|~1~|~1~|~01/STR~|~Build modern roundabout on rural route. 102059~|~1~|~2~|~02/STR~|~Waterline relocation 116422~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11. 99936~|~1~|~1~|~01/IMS~|~District wide mowing contract. 108394~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 12 11.10-11.40, DSR MOE-018. Rural other federal aid funded 80 federal/20 local. 98213~|~1~|~1~|~01/IMS~|~Culvert work at IR270/US3 interchange 98213~|~1~|~2~|~02/NHS~|~Work on two culverts on SR 315 83500~|~1~|~2~|~02/IMS~|~90/10 fund split for use with federal IM funds for the 2 ramp bridges: 1808605; CUY-090-2264W & 1808664; CUY-090-2276E. These structures will be replaced with engineered fill retaining walls. 83500~|~1~|~1~|~01/BRO~|~80/20 fund split for use with federal BR funds for the structure over IR-90: 1808559; CUY-090-2275 83500~|~1~|~3~|~03/ENH~|~80% federal / 20% local funding split using MPO enhancement for SFN 1808559 (Eddy Road bridge over IR-90) 89099~|~1~|~1~|~01/IMS~|~Pave culvert inverts at:MAD-71-11.56FRA-71-27.9001/IMS/OT/ 89099~|~1~|~3~|~03/S>2~|~Pave culvert invert at:DEL-257-3.5803/S>2/OT/ 89099~|~1~|~2~|~02/NHS~|~Pave culvert invert at:UNI-33-15.0802/NHS/OT/ 89099~|~1~|~4~|~04/STR~|~Pave culvert invert at:DEL-257-4.87MAD-42-22.86MAD-665-10.71MRW-19-3.35MRW-529-3.19PIC-762-1.9804/STR/OT/ 112698~|~1~|~1~|~01/NFP~|~Pavement Markings 112698~|~1~|~2~|~02/SAE~|~Install centerline rumble stripes on US 20 between Village of Wakeman and the City of Oberlin, HUR 020 (SLM 26.23-28.65) and LOR 020 (SLM 0.00 ? 4.55). 101345~|~1~|~1~|~01/S5K~|~bridge rehab. 124344~|~1~|~1~|~01/BRO~|~Repair bridge carrying US 22 Westbound over SR 9 and US 250 Eastbound to correct damage from over height vehicle strike. 107809~|~1~|~1~|~01/NFA~|~OH18-01 ER Event. Landslide repair project. MOE 255 14.30. Not on the federal aid system funded 100% state. 97762~|~1~|~1~|~01/NFP~|~Construct new Mt Sterling Outpost in Madison County 115336~|~1~|~1~|~01/MPO/NORT~|~Resurfacing. 106319~|~1~|~1~|~01/CMQ~|~Colonel Glenn Highway: University Boulevard to Old Yellow Springs Road. Installation of new sidewalk, pedestrian crossings with ADA compliant curb ramps, signal improvements, construction of retaining walls, and installation of lighting for the pedestrian infrastructure. 106319~|~2~|~2~|~02/MPO~|~Colonel Glenn Highway from west city corporation limit to North Fairfield Road. Addition of shared use path, decorative walls, decorative lighting, gateway columns, and landscaping . 102099~|~1~|~1~|~01/NHS~|~This is for signal upgrade on NHS route. 113740~|~1~|~1~|~01/SAF~|~Multi-Use Path along 161 from Ambleside/Satinwood Drive to Maple Canyon Ave. 119532~|~1~|~1~|~01/STR~|~Split for bridge work 123263~|~1~|~1~|~01/SAF~|~Lighting Maintenance. 123263~|~1~|~2~|~02/SAF~|~Lighting replacement. 86655~|~1~|~1~|~01/MPO~|~COMPLETE CONSTRUCTION OF THE PRIMARY GATEWAY AT THE INTERSECTION OF CENTRAL AVE/FIRST STREET BY INSTALLING A GATEWAY ARCH FEATURE; CREATE A SECONDARY GATEWAY AT THE INTERSECTION OF FIRST STREET/LINDEN AVE USING LANDSCAPE AND HARDSCAPE ELEMENTS; CONNECT THESE TWO GATEWAYS BY EXTENDING EXISTING STREETSCAPE ELEMENTS ALONG FIRST STREET BETWEEN THE INTERSECTIONS on South First Street from Central Avenue to Linden Avenue including both intersections in Miamisburg.. 101006~|~1~|~1~|~01/NFP~|~All work is in this split. 100% state funds from the District Preservation budget. SAC 4PS7 110898~|~1~|~1~|~01/SAF~|~Convert TWSC intersection into a single-lane roundabout at ERI-4-4.65 / SR 99 / Skadden. 110898~|~1~|~2~|~02/STR~|~Erie County Water Line relocation. 101062~|~1~|~1~|~01/NHS~|~Microsurface various routes in Montgomery County: MOT SR 4 SLM 4.30 to 11.88 (with repairs 11.58 to 11.88) = = MOT SR 725 SLM 8.31 to 10.13. 101062~|~1~|~2~|~02/STR~|~Microsurface US40 in Montgomery County: MOT US40 SLM 0.00 to 5.64 101062~|~1~|~3~|~03/S<2~|~Microsurface US40 in Montgomery County: MOT US 40 SLM 5.64 to 6.22 107756~|~1~|~1~|~01/STR~|~Covers all work to replace bridge 114215~|~1~|~2~|~02/NHS~|~NHS plan split for CPR joint treatment - SR 420 & SR 2 114215~|~1~|~1~|~01/IMS~|~IM - interstate CPR joint repair plan split 88386~|~1~|~1~|~01/BRO~|~Deck replacement with minimal approach roadway work on SFN 0602132 AUG 75 0498 R 88386~|~1~|~2~|~02/IMS~|~Deck replacement with minimal approach roadway work on SFN 0602043 AUG 75 0498L, SFN 0602108 AUG 75 0515L, and SFN 0602132 AUG 75 0515R. 115322~|~1~|~1~|~01/STR~|~Scour Remediation 109944~|~1~|~1~|~01/S<2~|~CEAO Funding 109944~|~1~|~2~|~02/S5K~|~Plan split for 100% Local items 112506~|~1~|~1~|~01/S>2~|~Split for resurfacing work 95397~|~1~|~1~|~01/ENH~|~Construction of a new 7.1 mile multi-use trail along an abandoned rial corridor that roughly parallels US-22/SR-3. Signed trail heads with gravel parking to be constructed at termini (Melvin Road and Borum Road). A signed trailhead with a paved parking area to be provided in the Village of Sabina. 95397~|~1~|~2~|~02/ENH~|~Plan Split to cover costs associated with dispute resolution. 97797~|~1~|~1~|~01/BRO~|~SFN 5710510, MOT-741-0841 over Conrail RR, GM Access Road - 1. Remove existing latex modified concrete overlay using hydrodemolition and replace with SDC overlay. 2. Replace torn seals in expansion joints. 3. Reset 6 rockers out of adjustment on rear abutment. 4. Seal concrete surfaces. 82582~|~1~|~1~|~01/MPO~|~Widening of Old SR74 from Olive Branch-Stonelick Road to Armstrong Boulevard, providing a 3 lane section with paved shoulders and curb and gutter drainage. Also included is access consolidation where feasible, sidewalk, and ITS applications. Modification to the existing structure spanning Shayler Run west of the Amelia-Olive Branch intersection will also be required, as well as roadway profile adjustments to eliminate sight distance problems. Sponsor - Clermont County TID 119986~|~1~|~1~|~01/MPO~|~Install Electric Vehicle charging stations in two locations 119986~|~1~|~2~|~02/NHS~|~Materials for EV project 122032~|~1~|~1~|~01/STR~|~Landslide repair 96450~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-TR 190-1.05 (SFN: 0931616) including vertical and horizontal alignment improvements, and roadway pavement widening to improve roadway safety. 104065~|~1~|~1~|~01/NHS~|~JAC 35 0.43 culvert replacement. 114890~|~1~|~1~|~01/S>2~|~Resurfacing. 114890~|~1~|~3~|~03/STR~|~Resurfacing. 114890~|~1~|~2~|~02/S5K~|~Resurfacing. 114890~|~1~|~4~|~04/IMS~|~Bridge preventative maintenance work. 75961~|~1~|~1~|~01/IMS~|~Resurface existing two lanes (both east and west bound) and other roadway related items. 107682~|~1~|~1~|~01/S<2~|~Resurfacing on US 224, SR 15, SR 65 and SR 109 using district preservation funds. (80% 4PF7 and 20% 4PS7). 107682~|~1~|~2~|~02/STR~|~Resurfacing on SR 189 and SR 190 using district preservation funds (80% 4PF7 and 20% 4PS7). 107682~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 97315~|~1~|~1~|~01/STR~|~ROS CR 167 102027~|~1~|~1~|~01/SAF~|~Turn Lane Addition and Section Improvement - 90/10 Fed Safety/Local Funds. Also using Earmark Funds TRC. 102121~|~1~|~1~|~01/STR~|~Rockfall repair. 88334~|~2~|~2~|~02/BRF~|~Bridge replacement and realignment 88334~|~1~|~1~|~01/BRF~|~Bridge replacement and realignment 114887~|~1~|~1~|~01/IMS~|~All items of work associated with pavement repairs and some miscellaneous items 107338~|~1~|~1~|~01/NFP~|~Construct new VIN Co. Full Service Facility (VIN Gar.). 100% State funds on State land (recently purchased). 120161~|~1~|~1~|~01/S5K~|~Urban Paving 98598~|~1~|~1~|~01/IMS~|~Rehab the following culverts: HAM-275-0688, HAM-275-0702, HAM-275-1157, HAM-275-1180, HAM-275-1918, HAM-275-1972, HAM-275-2066, HAM-275-2960 and HAM-71-0780 94590~|~1~|~2~|~02/SAF/FECO~|~"02/SAF/OT/FCEO" - sign upgrade in on US33A in rural section 94590~|~1~|~1~|~01/SAF/FECO~|~"01/SAF/OT/FCEO" Sign Upgrade project on CR33A 98517~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement NHS System 96982~|~1~|~1~|~01/IMS~|~Pavement Marking Work Order on various routes within District 4 107355~|~1~|~1~|~01/IMS~|~Repair non-emergency accident damage to Interstate bridges. 107355~|~1~|~2~|~02/IMS~|~Repair damage from bridge hit.Separate plan split requested to track monies for insurance claim. 107850~|~1~|~1~|~01/NHS~|~NHS Plan Split: DEL-23-17.75-17.85 123621~|~1~|~1~|~01/NHS~|~Plan split for NHS 124867~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order. 98157~|~1~|~1~|~01/S>2~|~Conversion of the existing intersection of Kauffman Avenue and Colonel Glenn Highway from a signal-controlled T-intersection to a modern roundabout. 98157~|~1~|~2~|~02/MPO~|~The project consists of widening Kauffman Avenue (SR-444), from Euclid Avenue to Lindberg Drive from 3 lanes to 4 lanes. Also, replacement of the existing traffic signal at Kauffman and Garland with mast arms, repair of deteriorated sections of asphalt and concrete pavement, drainage improvements, storm culvert extension, and replacement of a section of the adjacent Wright Brothers Huffman Prairie Bikeway. 122887~|~1~|~1~|~01/NFP~|~All work included in this plan split. 122181~|~1~|~1~|~01/NFP~|~NEVI Round 2B I-71-A 109769~|~1~|~1~|~01/STR~|~AC Overlay 112744~|~1~|~1~|~01/S>2~|~Columbus Urban Area Plan Split: DEL-521-2.29-3.15 112744~|~1~|~2~|~02/STR~|~Rural Plan Split: DEL-521-3.15-7.86 UNI-47-0.00-7.57 122506~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes 120469~|~1~|~1~|~01/NHS~|~Work for pavement markings along SR-176 96085~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for the construction of a 1000 ton salt storage building near the SR 93/ SR 662 Intersection im Muskingum County 116212~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into roundabout 117974~|~1~|~1~|~01/STR~|~Slope stabilization project. ATH 144 6.04. Funded 80 Federal/20 State. 108849~|~1~|~1~|~01/STR~|~Replace the superstructure of bridge PRE-40-0673 over Bantas Fork. 123060~|~1~|~1~|~01/STR/PENI~|~Slide repair in the village of Peninsula. 117324~|~1~|~1~|~01/NFA/FCEO~|~Replacement of superstructure carrying Christmas Rock Road over Arney Run (SFN 2336081) 117324~|~1~|~2~|~02/NFA/FCEO~|~100% Local Plan Split for non-eligible bridge items (non-Superstructure) included in the project. Replacement of superstructure carrying Christmas Rock Road over Arney Run (SFN 2336081) 105368~|~1~|~1~|~01/STR~|~AC Overlay with repairs on: DAR-49 SLM 26.33 to 32.03DAR-49 SLM 25.31 to 26.33 95317~|~1~|~1~|~01/CMQ~|~Propane Fueling Startion - provide a clean alternative fuel for City vehicles in the City of Springfield. 102884~|~1~|~1~|~01/STR~|~Resurfacing HOL-83 from Millersburg to Holmesville NCL. 95543~|~1~|~1~|~01/STR~|~Resurfacing of SR 60 from SLM 0.00 to SLM 2.97, and from SLM 3.71 to SLM 10.33 inclduing pavement repairs and pavement markings. 95543~|~1~|~2~|~02/NFA~|~General System Resurfacing including pavement repairs and pavement marking on HOL-60 from SLM 2.97 to SLM 3.71 (Non-FAS). 120088~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 91984~|~1~|~2~|~02/STR~|~Three span concrete slab deck removal and replacement with minimal approach work, possible guardrail end treatment upgraded. SFN 1903845 DAR SR 705 9.47 Hosapple Ditch. 91984~|~1~|~1~|~01/STR~|~Three span concrete slab deck removal and replacement with minimal approach wor, possible guardrail end treatment upgraded. SFN 1903810 DAR-SR-705 9.05 Mile Creek SFN 1903969 DAR-SR-705 10.03 E Baurer's Ditch. 113889~|~1~|~2~|~02/NFP~|~Plan split for storm sewer replacement at 100% local funding. 113889~|~1~|~3~|~03/NHS~|~Plan Split for incidental bridge rehabilitation work 113889~|~1~|~1~|~01/S>2~|~Plan split for converting Harper Rd to DDI and includes ramp modifications for US-422. 108944~|~1~|~1~|~01/IMS~|~Federal Emergency Project 2018 - 4BY7 (90% Federal) / 4BE7 (10% State) - No CAP - Installation of barrier wall along Gue-IR 70-19.65 to retain sloughing material. 107322~|~1~|~1~|~01/IMS~|~Split for interstate lighting upgrade 100604~|~1~|~1~|~01/S<2~|~Microsurfacing of COL-14 from 12.67 to 12.83 (STP Urban section) 100604~|~1~|~2~|~02/STR~|~Microsurfacing of COL-14 from 12.83 to 19.26 and COL-170 from 11.42 to 14.96 104711~|~2~|~4~|~04/NHS~|~Part 2ROS 23 21.20 Blackwater Rd. 104711~|~3~|~2~|~02/STR~|~Part 3ROS SR 159 10.10-10.93 104711~|~1~|~1~|~01/NHS~|~Part 1ROS 23 19.46 Crouse Chapel 104711~|~3~|~3~|~03/S<2~|~Part 3Restripe lanes on SR 159 4.24-4.33. 102411~|~1~|~1~|~01/SAF~|~Replacement of existing non-standard guardrail and installation of new guardrail where needed. Berm work will be performed and guardrail will be added where vertical drop-offs are a concern. 106825~|~1~|~1~|~01/NFP~|~Various upgrades to vehicle detection, signal cabinets, controllers & communication statewide 98671~|~1~|~1~|~01/STR~|~Perform horizontal curve and superelevation improvements, widen the pavement and shoulders, resurface and improve the intersection geometrics on CR 70 (Philothea Road) from SLM 6.21 to 9.28. 96130~|~1~|~1~|~01/NFP~|~Facilities project at Vermilion Outpost 106414~|~1~|~1~|~01/NFA~|~Replace Shawan Falls Drive Bridge over S. Fork Indian Run 104983~|~1~|~1~|~01/IMS~|~Part 1: Interchange expansion work 104983~|~1~|~2~|~02/NFP~|~Part 1: Non-eligible work for bridge parapet fence lettering and attachments on Miller Road. 104983~|~2~|~3~|~03/IMS~|~Part 2: I-77 existing lane reconstruction from SR-21 to the OTC in Summit County 104983~|~2~|~4~|~04/IMS~|~Part 2: Widening I-77 from SR-21 to the OTC in Summit County 104983~|~2~|~5~|~05/IMS~|~Part 2: Work on the existing structures over Brecksville Road 104983~|~2~|~6~|~06/IMS~|~Part 2: Work to widen the existing structures over Brecksville Road 104983~|~1~|~7~|~07/IMS~|~Part 1: Work on the existing Miller Road Structure. 104983~|~2~|~8~|~08/IMS~|~First Energy - Ohio Edison costs 104983~|~1~|~9~|~09/NFA~|~109.04 Material buy back, no CE labor 110011~|~1~|~1~|~01/NFP~|~Reactive Maintenance 102116~|~1~|~1~|~01/NFP~|~SFN 4806115 100044~|~1~|~1~|~01/NHS~|~Resurfacing 118680~|~1~|~1~|~01/IMS~|~Split for barrier and lighting replacement. 95312~|~1~|~1~|~01/STR~|~Intersection Improvement project. ATH 56 3.25 and ATH 356 4.77. Federal Aid route, 100% State funds. 95312~|~1~|~2~|~02/NFA~|~Culvert replacement at Waterloo Park. ODNR funded 100% state. 101787~|~1~|~1~|~01/SAF~|~Improvements at Livingston Ave/James Rd intersection 98802~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for eligible resurfacing work items. 98802~|~1~|~2~|~02/NFP~|~100% local participation on items not eligible for federal-aid 105737~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items 105737~|~1~|~2~|~02/MPO~|~Plan Split 2 is for 100% local items 87730~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 107806~|~1~|~1~|~01/NHS~|~All work in this project. Erosion repair at various location on the NHS. Funding is 80% federal and 20% state funds from the District Preservation Program budget. 83653~|~1~|~1~|~01/NHS~|~JAC US 35 7.83 Rock SlideOn US35, 0.18 mile south eat of its intersection with CR71, it is proposed to regrade an existing rock cut by blasting. 80/20 Split01/NHS/OT/State 100655~|~1~|~1~|~01/S<2~|~This plan split is for the COL 267 and JEF 43 intersections. 100655~|~1~|~2~|~02/NHS~|~This plan split is for the TUS 36 and TUS 250 locations. 100655~|~1~|~3~|~03/STR~|~This plan split is for the TUS 258 location. 95210~|~1~|~1~|~01/NFP~|~Mowing contract 92989~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Kno-SR 586-00.00 to 03.28; 2) Kno-SR 586-03.41 to 11.37; 92989~|~1~|~3~|~03/S<2/MTVE~|~"03/S<2/PV/MTVE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving resurfacing with related work in Mount Vernon on Kno-SR 586-12.92 to 13.98 92989~|~1~|~4~|~04/STR~|~"04/STR/BR/ " - District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Repairs and 3" overlay of approach slabs and concrete slab deck. 92989~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Kno-SR 586-11.37 to 12.92 103488~|~1~|~1~|~01/MPO~|~Interconnect and upgrade traffic signals within the City of Troy. 114989~|~1~|~1~|~01/NHS~|~Guardrail replacement. 98486~|~1~|~2~|~02/NHS~|~Resurfacing SUM US 224 from 14.30 to 14.84. 98486~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing SUM US 224 from 11.25 to 12.70, urban paving in the City of Akron. 98486~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span. 98486~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span. 98486~|~1~|~5~|~05/MPO/AKRO~|~100% City of Akron items including full depth pavement repairs and catch basin reconstruction. 98486~|~6~|~6~|~06/NHS~|~100% City of Akron Change Order for additional pavement striping. 101514~|~1~|~1~|~01/S<2~|~CO Inspection 101514~|~1~|~2~|~02/S<2~|~CO Inspection 101514~|~1~|~3~|~03/S<2~|~FY2018 Balance 110346~|~1~|~1~|~01/SAF~|~CEAO Safety funds plan split 100125~|~1~|~1~|~01/IMS~|~Inspection 98845~|~1~|~1~|~01/NHS~|~OTT-SR163 (south side) from SLM 24.16 to 25.06 114256~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges 116081~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 116081~|~1~|~2~|~02/NFA~|~Crack sealing of various ODOT facility parking lots. 111133~|~1~|~1~|~01/SAF~|~Constructing roundabout at the intersection of ATB SR 307 and SR 534. 111133~|~1~|~2~|~02/STR~|~Resurfacing. 111133~|~1~|~3~|~03/S5K~|~Culvert replacements. 121386~|~1~|~1~|~01/SAF~|~Plan split for RPMs 111436~|~1~|~1~|~01/S<2~|~Minor rehab on WAS 26 0.16-0.63. Acme Street in the City of Marietta. 100% Local funds. 111436~|~1~|~2~|~02/S<2~|~Minor rehab on WAS 26 0.16-0.63. Acme Street in the City of Marietta. ODOT portion is 80% Federal and 20% State funded. 111436~|~1~|~3~|~03/SAF~|~Signal replacement on WAS 26 (Acme Street) and Phillips Street. Safety funded 90% Federal 4HJ7/10% State 4BC7. 113945~|~1~|~1~|~01/BRF~|~Replacement of structure > 20' span. 93617~|~1~|~1~|~01/S<2~|~Work inside the Lima Urbanized Area but outside the City of Lima. On SR 117 from the beginning of the project at 19.14 to the Lima Urbanized Boundary at 21.32. State and federal funds from the District Preservation Program budget. No local funds. 93617~|~1~|~2~|~02/STR~|~Work outside the Lima Urbanized Area. On SR 117 from the Lima Urbanized Boundary at 21.32 to the end of the project at 28.61. State and federal funds from the District Preservation Program budget. No local funds. 86249~|~1~|~1~|~01/S>2~|~80/20 fed/local funding split for all work using NOACA STP funds. 81728~|~1~|~1~|~01/NHS~|~priority system minor rehab. of COL-11-10.82 to 16.01; resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking 124483~|~1~|~1~|~01/NHS~|~Install sidewalks and ADA curb ramps 77146~|~1~|~1~|~01/NHS~|~Work on the NHS system other than the work on the bridges. All funds from the District Preservation Program 80% 4PF7 and 20% 4PS7. There are no local funds in this split. 77146~|~1~|~2~|~02/NHS~|~For work on all bridges in the project. All funds from the District Preservation Program budget. There are no local funds in this split. 111312~|~1~|~1~|~01/STR~|~District 5 Geological Site Management Funding - 4SF7 (80% Federal / 4SS7 (20% State) - See CAP Comment - River bank stabilization along Kokosing River adjacent to SR 229. 94204~|~1~|~2~|~02/NHS~|~Plan split for all NHS locations 94204~|~1~|~1~|~01/IMS~|~Plan split for all Interstate locations 94204~|~1~|~3~|~03/S>2~|~Plan Split for all Large Urban locations 94204~|~1~|~4~|~04/S<2~|~Plan Split for all Small Urban Locations 94204~|~1~|~5~|~05/STR~|~Plan split for all Rural Locations 94204~|~1~|~6~|~06/SAF~|~Installation of flashing beacon. 107967~|~1~|~1~|~01/IMS~|~plan split for the longitudinal joint repairs 113360~|~1~|~1~|~01/S>2~|~Increase capacity and complete 5-lane curbed section on Social Row Road from Waterbury Ridge Lane to 300? east of Paragon Road. Phase 1 is the initial phase of a two-phase project to widen Social Row Road to five lanes from the existing 5-lane section at Waterbury Ridge Lane through the intersection of Paragon Road. The second phase will improve Social Row Road from Paragon Road to Sheehan Road. 123768~|~1~|~1~|~01/BRO~|~Bridge Painting 101276~|~1~|~1~|~01/STR~|~Resurfacing STP Rural eligible portion. 101276~|~1~|~2~|~02/NFA~|~Resurfacing non-federal aid eligible portion (SAN-635-0.00-6.43) portion of project. 101106~|~1~|~1~|~01/SAE~|~Eligible work to improve the crosswalks to the Willowick Middle School and improvement to the bicycle parking. 93992~|~1~|~1~|~01/BRF~|~Replacement of SFN4733886 on CR 42 (Bursley Road) 93992~|~1~|~2~|~02/BRF~|~Bridge replacement, 80/20 Fed/Local, with no Credit Bridge. 93992~|~1~|~3~|~03/BRO~|~Bridge Replacement on Bursley Road (CR 42). 98664~|~1~|~1~|~01/SAF~|~Place centerline, edge line and other pavement markings on various routes in Mercer County. 96236~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.00-7.96 96236~|~1~|~2~|~02/STR~|~STP Rural bridge replacement Non BR eligible MAD-40-5.92 over Roberts Ditch 122035~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 111027~|~1~|~1~|~01/SAF~|~Repair from landslide. 88504~|~1~|~1~|~01/NHS~|~Resurface US-23 from SLM 11.84 to SLM 17.62 88504~|~1~|~2~|~02/SAF~|~SEN-23 from SLM 12.26 to SLM 12.50 91716~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repairs. GAL 141 0.00-7.70, GAL 160 3.70-14.68. Rural other federal aid funded 80 federal/20 state. 91716~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 141 21.44-22.03, GAL 160 3.06-3.70, GAL 588 10.83-11.71. Urban other federal aid funded 80 federal/20 state. 116619~|~1~|~1~|~01/NHS~|~All work 90972~|~1~|~1~|~01/CMQ~|~Plan Split for STA SR 93 Signals at Cherry and Locust Streets 85299~|~1~|~2~|~02/ENH/CANT~|~Construction of sidewalks, bike lanes, landscaping, in the City of Canton, Stark County, Ohio. 85299~|~1~|~1~|~01/NHS/CANT~|~Widening of 12th Street from Monument to Maple, including the widening of Market Street (SR-43) approaches for addition of left turn storage lanes, in the City of Canton, Stark County, Ohio. 91859~|~1~|~1~|~01/S>2~|~Plan Split for the Urban section of the pavement on on CLE SR 222 between SLM 19.41-21.44 and 23.89-25.0 91859~|~1~|~2~|~02/STR~|~PLan split for the Rural portion of the pavement on on CLE SR 222 between SLM 21.44-23.89 115998~|~1~|~1~|~01/IMS~|~Plan split for slope repair 111323~|~1~|~1~|~01/NFP~|~Reconstruct S. Industrial Parkway. 111323~|~1~|~2~|~02/NFA~|~Created for J&C Involvement. 111323~|~1~|~3~|~03/NFP~|~Created for J&C involvement. 104007~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 50 22.78, SFN 8200572. Rural other federal aid funded 80 federal/20 state. 92269~|~1~|~1~|~01/MPO~|~Resurfacing 106447~|~1~|~1~|~01/NFA~|~The City of Marion will revitalize and expand Cheney Ave going north from Barks Road W to Evans Road. A total distance of approximately 1500 feet. 111258~|~1~|~1~|~01/NFP~|~Geneva State Park resurfacing. 111258~|~2~|~2~|~02/NFP~|~Resurfacing, TRU Mosquito State Park, Road R01. 111258~|~3~|~3~|~03/NFP~|~TRU Mosquito State Park resurfacing F-1 and Marina parking lots. 99509~|~1~|~1~|~01/NHS~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7 99509~|~1~|~2~|~02/NHS~|~4PS7 Funds to cover any funds over the Cap of $489,164.00 86853~|~1~|~1~|~01/SAF~|~Safe Routes to School funding to construct sidewalk on Rich St from Central Ave to Yale Ave 98469~|~1~|~1~|~01/S<2~|~For work inside the Ottawa Glandorf Urban Area. US 224 from the CSX RR to the east urban boundary at 23.16. Please note that the log pont of the urban boundary need to be reviewed and updated as necessary when we get the information on new boundary location. 98469~|~1~|~2~|~02/STR~|~For work outside the Ottawa Glandorf Urban Area including all work in the Village of Bluffton. 98469~|~1~|~3~|~03/SAF~|~Center line rumble stripes on SR 31 in Hardin County from 0.00 to 1.904 and 2.796 to 9.539 and on SR 65 in Putnam County from 1.84 to 6.554. Funding from the Safety Program. 108031~|~1~|~1~|~01/NFP~|~Reactive Maintenance on general and priority system pavements using partial depth pavement repairs 77317~|~1~|~1~|~01/IMS~|~District Allocation 103413~|~1~|~1~|~01/STR~|~Landslide repair. NOB 145 9.87. Work length approximately 150 ft. DSR NOB-003. 103413~|~1~|~2~|~02/STR~|~Landslide repair. NOB 145 10.03, DSR NOB-004. Funded 80 federal/20 state. 95818~|~1~|~2~|~02/NFP~|~non eligible urban paving items. 95818~|~1~|~1~|~01/NHS~|~Urban Paving Eligible items 120987~|~1~|~1~|~01/IMS~|~All work is within this split 88303~|~1~|~2~|~02/STR~|~Widen, rehabilitate and/or resurface approximately 10 miles of county roads. Federal Aid Rural, 80% Federal/20% Local. GAL CR 10 0.00-3.09, CR 20 2.84-2.93, CR 35 0.00-1.75 and CR 50 6.36-10.38. 88303~|~1~|~1~|~01/NFA~|~Widen, rehabilitate and/or resurface approximately 10 miles of county roads. Not on Fed Aid system (Local), 100% Local. GAL CR 20 0.00-2.84 and 2.93-10.82. 88303~|~1~|~3~|~03/S<2~|~Widen, rehabilitate and/or resurface approximately 10 miles of county roads. Federal Aid Urban, 80% Federal/20% Local. GAL CR 8 0.00-0.83 and CR 35 1.75-4.23. 92833~|~1~|~1~|~01/S<2~|~HEN SR110 0.66-0.85 relocation due to slide 92798~|~1~|~1~|~01/S>2/Warr~|~Resurfacing of State Route 169 from US-422 to Corporation Limit, in the City of Warren, Trumbull County, Ohio. 92798~|~1~|~2~|~02/S>2/Warr~|~Guardrail work requested by the City of Warren, Trumbull County, Ohio. 100% Local cost. 101532~|~1~|~1~|~01/NHS~|~DSR# BEL-025 97099~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 669 1656, SFN 5802288. Rural other federal aid funded 80 federal/20 state. 107797~|~1~|~1~|~01/ENH~|~Construct pedestrian bridge over the Cuyahoga River. 110129~|~1~|~1~|~01/STR~|~PIC 159 from 0.00 to 8.56 118931~|~1~|~1~|~01/NHS~|~conduits 1988785, 1988782, and 1989089 have been linked to CO CC NHS 118931~|~1~|~2~|~02/STR~|~conduit 1834612 linked to CO CC rural funding event 118850~|~1~|~1~|~01/STR~|~added plan split. 100932~|~1~|~1~|~01/S<2~|~This plan split is for the small urban routes. 100932~|~1~|~2~|~02/STR~|~This plan split is for the rural routes. 112968~|~1~|~1~|~01/SAF~|~Install cable barrier in the median of SR 161 from Hamilton Rd to Babbitt Rd 91917~|~1~|~1~|~01/NFP~|~100% 4CP7/Maint. Funds for 1 year Fast Dry Pavement Marking 92686~|~1~|~1~|~01/NFP~|~This project uses 100% state funds SAC 4PS7 - No cap - Milling and resurfacing on SR235. 96301~|~1~|~1~|~01/STR~|~D09 GR 2018 96301~|~1~|~2~|~02/SAE~|~100% safety funds for guardrail. 123911~|~1~|~1~|~01/MPO~|~Construction of sidewalk on the west side of Stedman Lane from Dayton-Xenia Road to Summerfield Park. 108940~|~1~|~1~|~01/CMQ~|~construction of a shared use path that is eligible for federal-aid 75923~|~1~|~1~|~01/NHS~|~LAW CHesapeake Bypass Phase 2From the Interchange of SR7 and SR527 east to it's intersection with SR775. Project Description: Construct the East bound lanes of the proposed Chesapeake Bypass (SR7) from the interchange of SR7 and SR527 eastward to it's intersection with SR775. Project length is 5.2 miles. House Bill Id's: OH131, OH232, OH379 and TC0903 TRAC01/NHS/PV/State 75923~|~1~|~2~|~02/NHS~|~Brdg Construction, 10 new Brdgs - LAW CHesapeake Bypass Phase 2From the Interchange of SR7 and SR527 east to it's intersection with SR775. 2.51 (B-1), 3.70 (B-16), 3.76 (B-2), 3.87 (B-17), 5.10 (B-4), 5.63 (B-5), 1.05 (B-14), 7.11 (B-13), 7.13 (B-6L) and 7.13 (B-6R)TRAC02/NHS/BR/State 107535~|~1~|~1~|~01/NHS~|~Concrete repairs on BEL-7 93372~|~1~|~1~|~01/NHS~|~Priority system paving of DEL-23: 7.41-17.64 112265~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 100907~|~1~|~1~|~01/STR~|~Rehab or replace various culverts in Clermont and Warren Counties 100907~|~1~|~2~|~02/SAF~|~Widen the northbound US-42 shoulder in Warren County from Township Line Rd (SLM 15.69 to the culvert at 15.84 to be paid with Safety funds. 100907~|~2~|~3~|~03/STR~|~For slide repair, to install drilled shaft wall. 110343~|~1~|~1~|~01/STR~|~Resurfacing plan split 103631~|~1~|~1~|~01/MPO~|~80% federal with 20% TRC for work to improve the pedestrian and transit users access that is eligible for MPO funds. 122212~|~1~|~1~|~01/NFA~|~NEVI Round 2B-IR80-A 88704~|~1~|~1~|~01/NFP~|~District Wide Bridge Maintenance Contract - bridges to be determined later. 123609~|~1~|~1~|~01/IMS~|~Funding split for Interstate. 117535~|~1~|~1~|~01/BRF~|~CEAO funding eligible work for the replacement of the bridge. 117535~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work. 105459~|~1~|~1~|~01/STR~|~Plan Split for rural 735 124005~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 96993~|~1~|~1~|~01/NFP~|~Added plan split due to funding 123793~|~1~|~1~|~01/STR~|~stp rural 93580~|~1~|~1~|~01/STR/FRED~|~- Village of Fredericktown SRTS project. 4SC7 (80% Federal) / 4BG7 (20% Local converted with TRC) - CAP $388,946.61 ($500,000.00 minus $106,084.03 {PE} & minus $4,969.36 {RW}) Sidewalks around the school and along Village Streets. The Village of Frederickstown will be responsible for costs above the CAP. 114672~|~1~|~1~|~01/S>2~|~conduit linked 114672~|~2~|~2~|~02/STR~|~conduit linked 103760~|~1~|~1~|~01/STR~|~Bridge deck replacement for MEG 124 5589, SFN 5301831. 98702~|~1~|~1~|~01/MPO~|~Resurfacing Olde Eight Rd from Boston Mills Rd to Boston Heights North Corp limit. 98702~|~1~|~2~|~02/IMS~|~Micro-surfacing of SUM IR77 (SLM 19.51 to SLM 21.99) and SUM IR271 (SLM 0.00 to SLM 2.33), in Summit County, Ohio. 77371~|~1~|~2~|~02/NHS~|~Tentative split for NH/added capacity portion of FRA-71 reconstruction 77371~|~1~|~1~|~01/IMS~|~Tentative split for IM portion of FRA-71 reconstruction 77371~|~1~|~4~|~04/ENH~|~Tentative split for ODOT funding of aesthetic items 77371~|~1~|~5~|~05/MPO~|~Tentative split for MORPC/Columbus funding for added bridge width for aesthetics 77371~|~1~|~3~|~03/IMS~|~Tentative split for bridge replacements 96538~|~1~|~1~|~01/IMS~|~Plan split for microsurfacing on WAR-75 116667~|~1~|~1~|~01/STR~|~Place Holder plan split until location is selected 112461~|~1~|~1~|~01/NHS~|~Pave culvert invert. ATH 50 38.09 (CFN 1880452) and 38.77 (CFN 1880453). NHS route funded 80 Federal/20 State. 83946~|~1~|~2~|~02/STR~|~Pavement Markers needed for the project. 83946~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items on US 127 from the South Corporation Limit of Castine, (SLM 0.76) to the Junction of US 36 (SLM 9.57). Also resurfacing of West Street SR 185 within the village of Versailles from SLM5.29 to 5.45. 118120~|~1~|~1~|~01/MPO~|~MPO STBG funds 118120~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope item: asphalt rejuvenating agent. 92386~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1602527 COS SR541 29.18 Intersect: Trib Of Bacon Run; Not BR Eligible for Replacement: Length=31 SD/FO(0) SR=68.6 DSR=5 98823~|~1~|~1~|~01/IMS~|~Emergency Type C repair for steel straightening on MOT-675-0647 Bridge (Bigger Road over IR 675) 111331~|~1~|~1~|~01/NFP~|~ODNR project to resurface R-6 and R-8 in Burr Oak State Park. Funded 100% State ODNR. 102509~|~1~|~1~|~01/IMS~|~Install new signal at I-77NB & Shuffel St, replace traffic signal at SR-44 & Columbus Rd, replace overhead flasher at SR 619 & McCallum Ave. 105370~|~1~|~1~|~01/STR~|~Chip seal on rural route: MER SR 117 SLM 0.00 to 2.09 108756~|~1~|~1~|~01/S<2~|~Culvert replacement on Bellefontaine Ave over Jones Ditch 104266~|~1~|~1~|~01/SAF~|~Upgrading guardrail and end terminals on various county routes throughout Trumbull County. 102341~|~1~|~1~|~01/S<2~|~Microsurfacing US 62 from SR 165 to SLM 5.44, and from SLM 10.02 (TR 151) to SR 45. 102341~|~1~|~2~|~02/STR~|~Microsurfacing US 62 from SLM 5.44 to 10.02 (TR 151). 96757~|~1~|~1~|~01/S5K~|~SAN-6 from SLM 19.09 to 19.918 96757~|~1~|~2~|~02/STR~|~SAN-6 from SLM 19.918 to 23.44 24948~|~1~|~1~|~01/NHS~|~Patch and place RCP to Bridge No. HAM-125-0378, (SFN 3111318). Bridge spans tributary of Clough Pike. 108027~|~1~|~1~|~01/NFP~|~Cracksealing 86936~|~1~|~3~|~03/S>2/CANT~|~Resurfacing of State Route 627 from SLM 3.35 to SLM 3.88 and SLM 3.99 to SLM 4.55, in the City of Canton, Stark County, Ohio. 86936~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of SFN# 7606524, STA SR-627-4.48 over IR-77. 86936~|~1~|~2~|~02/S>2~|~Plan split for the resurfacing of STA SR-627 from SLM 0.15 to SLM 3.35 and SLM 3.88 to SLM 3.99, in Perry Township and Canton Townships, Stark County, Ohio. 86936~|~1~|~4~|~04/S>2/CANT~|~100% City of Canton items, Stark County, Ohio. 110421~|~1~|~1~|~01/IMS~|~01/IMS/PV/ - Plan Split 1 97383~|~1~|~2~|~02/NHS~|~Concrete deck overlay MEG 7 0471, SFN 5300096. Also includes substructure work. NHS route funded 80 federal/20 state. 97383~|~1~|~1~|~01/NHS~|~Corridor rehab on MEG 7 4.65-5.80. Work includes signal installation and the addition of left turn lanes. 112193~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order. 89054~|~1~|~1~|~01/NHS~|~From Bridge No. HAM-71-0181, the Pedestrian overpass over I-71/I-471to Bridge No. HAM-71-0226, Elsinore Pl. Overpass This is Construction Contract (CC) OH-1A of the Brent Spence Bridge Project. The purpose of this project is to restore I-71 and I-471 to their original lane configurations at the completion of the Brent Spence I-75 construction. Temporay configuration will be constructed under CC OH-1, PID 89053. 117992~|~1~|~1~|~01/BRO~|~Bridge replacement. All work is included in this split. 100957~|~1~|~1~|~01/NHS~|~Resurfacing of POR SR 5 from 0.55 to 0.94 and 1.30 to 5.09, POR SR 44 from 11.77 to 12.08. 100957~|~1~|~3~|~03/STR~|~Resurfacing of POR SR 44 from 15.03 to 16.48. 100957~|~1~|~2~|~02/S>2~|~Resurfacing of POR SR 44C from 0.00 to 0.36. 100957~|~1~|~4~|~04/SAE~|~Adding rumble stripes. 85102~|~1~|~2~|~02/STR~|~Resurface portions of SR 503 in Preble County with pavement repair; from SLM 12.01 - 19.82 and SLM 20.86 - 25.19 85102~|~1~|~1~|~01/STR~|~Rehabilitate bridge PRE-503-1557 (SFN 6803814) by replacing the continuous concrete slab and other minor bridge work. Seal decks of other bridges (SFN 6803725, 6803873, 6803911, 6803938 & 6803997) 89138~|~1~|~1~|~01/NFA~|~PIK CR47 0.48 Brdg Replacement In Pike county, on CR 47, 0.48 miles from SR 104 Project Description: It is proposed to replace structure (SFN 6631142) at 0.48 over Prussia Run. There is also CSTP funding allocated to rehabiliation of roadway on Denver Road. Per CEAO letter, 8/3/10, FED Max for LBR is $1,052,920; FED Max for CSTP is $378,400. CEAO 80 Fed/20 Local Match by Pike County 01/NFA/BR/Pike 103961~|~1~|~1~|~01/STR~|~MAR-95-22.64 Replace deck overlay, paint structural steel, minor repairs 107330~|~1~|~1~|~01/SAE~|~Plan Split 83122~|~1~|~1~|~01/BRF~|~Remove and replace an existing 2 span, 67' bridge over the Miami and Erie Canal, SFN 0660272 MAUGMR **C 0.00. Remove an existing 27" Bridge over the Upper Mill Race of the Miami & Erie Canal, and replace with a 66" culvert pipe, SFN 0660329 MAUGMR **C 0.00. 101111~|~1~|~2~|~02/S>2~|~plan split for the large urban sections on BUT-129 101111~|~1~|~1~|~01/NHS~|~plan split for the NHS portions on BUT US 27 101111~|~1~|~3~|~03/STR~|~Plan Split for edge replacements on BUT-27 + CLE-133. 111629~|~1~|~1~|~01/NFP~|~Loop detector maintenance. 101643~|~1~|~1~|~01/BRO~|~District Preservation 4PF7(80% Federal) / 7BPB-4PS7(20% State) - CAP (See Comments) - Rehabilitation of 3004058 Gue SR209 08.56 Intersect: Wills Creek & CSX RR: BR Eligible: Length=848 SD/FO(0) SR=58.7 DSR=4 101643~|~1~|~2~|~02/ENH~|~Local Funding - 4BG7 (100% Local) - No CAP - Repair of steps near GUE-209-8.56 bridge. 115795~|~1~|~1~|~01/S>2~|~Resurface existing roadway, widen shoulders, and install concrete barriers, tree lawns and bike paths. Upgrade signal at Dixie/Northwoods. Construct roundabout at Dixie/Lightner. 122726~|~1~|~1~|~01/S>2~|~Plan Split for MPO STBG funded scope 122726~|~1~|~3~|~03/NFP~|~Funding split for locally funded scope, such as water line replacement 122726~|~1~|~2~|~02/ENH~|~TMACOG TAP Funding for SUP between Monroe and Bancroft 93970~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 120566~|~1~|~1~|~01/ENH~|~TAP funding 4B37 80% & 4HJ7 20% 120566~|~1~|~2~|~02/ENH~|~District Preservation funding event at 80/20 4PF7/4PS7 97667~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing of the existing pavement SR 725 SLM 19.75 to SLM 22.31 within the City of Centerville. 96681~|~1~|~1~|~01/NFP~|~FY 2019 Pavement Preventive Maintenance on various Routes in ATB, MAH and TRU Counties. 101390~|~1~|~1~|~01/STR~|~HUR-SR-61 6.700 to 12.080 60-AC Overlay w/Rpr HUR-SR-162 19.980 to 23.640 60-AC Overlay w/Rpr HUR-SR-162 24.970 to 29.020 60-AC Overlay w/Rpr 101390~|~1~|~2~|~02/SAF~|~Centerline rumble stripes on HUR-61-6.70-12.08 101060~|~1~|~1~|~01/S>2~|~Fine graded polymer AC overlay to POR SR 44 14.90 to 15.00. 101060~|~1~|~2~|~02/STR~|~Fine graded polymer AC overlay to POR SR 44 15.00 to 16.48. 117657~|~1~|~1~|~01/NHS/PATA~|~Construction of sidewalks and signal upgrade along SR 16 (Broad Street) in Pataskala. 91155~|~1~|~1~|~01/SAF~|~Herbicidal spraying project, District wide on various routes and sections. 100% State. 90953~|~1~|~1~|~01/SAE~|~The split uses Safe Routes to School funding and is eligible for 100% federal funding. 109830~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout POR, STA and SUM counties. 87233~|~1~|~1~|~01/STR~|~ADA SR125 0.00 - 8.44 Resurfacing ProjectOn SR125, beginning at the Brown County line (SLM 0.00) east to its intersection with SR41 (SLM 8.44) it is proposed to resurface the highway with aspahalt concrete.Brdgs that are pave thru:0102857 ADA SR125 0.41 Intersect: Sacremento Run0102881 ADA SR125 0.48 Intersect: Kirker Hollow Stream0102911 ADA SR125 1.33 Intersect: Spock Run0102954 ADA SR125 1.41 Intersect: Aids Run0103039 ADA SR125 6.33 Intersect: Humboldt Creek80/20 split01/STR/PV/State 87233~|~1~|~2~|~02/STR~|~ADA SR125 0.00 - 8.44 Resurfacing ProjectBrdgs F/Rehab0103004 ADA SR125 3.03 Intersect: Hills Fork Of Eagle Creek0103063 ADA SR125 6.52 Intersect: East Fork Of Eagle Creek80/20 split02/STR/BR/State 98079~|~1~|~1~|~01/SAE~|~Restripe the crosswalks at the intersections of Broadway with Main Street, Mulberry Street, and Silver Street; Install LED countdown ped heads at the intersection of Broadway and Mulberry Street; Install a new crosswalk with a push button activated LED ped crossing sign across Main Street at Mechanic Street. 101330~|~1~|~1~|~01/STR~|~Bridge replacement. 119335~|~1~|~1~|~01/STR~|~Resurfacing. 111117~|~1~|~1~|~01/S5K~|~Bridge replacement project. HOC 278 5.47 (SFN 3710002). Urban other federal aid funded 80 federal/20 state. 98675~|~1~|~1~|~01/NFA~|~Widen pavement, shoulders & clear zones, resurface, superelevate, improve intersection geometrics. CR 21 B 0.60-2.00 98034~|~1~|~1~|~01/NFA~|~District Preservation Pavement Program - 7BPB (100% Bond or 4PS7(100% State) - See CAP Comment - Resurfacing of Cos/Hol-SR 206-3.85/0.00 107790~|~1~|~1~|~01/STR~|~created plan split 98364~|~1~|~1~|~01/MPO~|~Resurfacing of Hopocan Road from 8th St NW to Wooster Ave in the City of Barberton. Includes milling, resurfacing, striping and some partial and full depth repairs. 96669~|~1~|~1~|~01/IMS~|~Apply pavement markings 94222~|~1~|~1~|~01/NFP~|~District wide maintenance contract for highway lighting in D08 for FY2018. 97966~|~1~|~1~|~01/S>2~|~SR 41 SLM 9.51 to SLM 11.19 (OM 038) - Resurface the existing roadway with 1.75" thick asphalt mill and fill. 125015~|~1~|~1~|~01/S>2~|~ODNR park resurfacing 109483~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 111371~|~1~|~1~|~01/MPO~|~MPO Funded item split 116464~|~1~|~1~|~01/ENH/AKRO~|~Construction of a multiuse trail in the City of Akron. 104649~|~1~|~1~|~01/SAE~|~01/SAE/OT/ For traffic signals on the NHS System. Funding is 100% federal funds since signal construction is eligible for 100% safety funds. 104862~|~1~|~1~|~01/STR~|~Replace and rebuild existing guardrail. WAS CR 25 1.55-7.71. Rural other federal aid funded 80 federal/20 local. 101352~|~1~|~1~|~01/NHS~|~AC overlay with repairs to TRU SR 45 from 10.64 to 11.17, AC overlay without repairs to TRU SR 45 from 11.17 to 11.71. 107288~|~1~|~1~|~01/S>2~|~Split for paving work 107288~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible federal funded work at 100% local cost. 107288~|~1~|~3~|~03/SAF~|~Pedestrian improvements at Mastick Road using safety funds. 98151~|~1~|~2~|~02/S<2~|~HIG 138 13.06 - 14.97 98151~|~1~|~1~|~01/STR~|~HIG 138 7.03 - 13.06 98151~|~1~|~3~|~03/S<2~|~HIG 138 (14.35-14.97) 80/20 Federal/Local 98151~|~1~|~4~|~04/S<2~|~HIG 138 13.67 (SFN 3603067) 88336~|~1~|~1~|~01/BRF~|~Bridge replacement 120144~|~1~|~1~|~01/MPO~|~Installation of electric Vehicle Charging infrastructure at the Green Township Government Complex and Veterans Park 99466~|~1~|~2~|~02/IMS/KY~|~Retrofit by replacement of 3 Dynamic Message Signs (DMS), within Kentucky to be compatable with the statewide traffic management center. 99466~|~1~|~1~|~01/IMS~|~Retrofit by replacement of 7 Dynamic Message Signs (DMS), within Ohio to be compatable with the statewide traffic management center. 94901~|~1~|~1~|~01/IMS~|~Project will include deck overlay with SDC, conversion of the abutments to semi-integral, structural steel painting, and retrofitting the parapet. Bridge # SHE-75-1654, SFN 7502494 CR 52 Amsterdam Road over IR 75. 86654~|~1~|~1~|~01/S>2~|~Intersection improvement at the Clyo Road and Spring Valley Pike Intersection. Construct dedicated left turn lanes on each approach with traffic signal control. Additional left turn bays on the Northbound approach at Clyo/Country Corner Lane and on the Eastbound approach at Spring Run Lane/Spring Valley Pike, approach lanes are to be 12' and curb installed immediately at the intersection with paved shoulders. A culver will be widened. 118148~|~1~|~1~|~01/STR~|~Landslide repair. 109257~|~1~|~1~|~01/NFP~|~2 year lighting maintenance contract on various routes within POR, STA and SUM Counties. 109257~|~1~|~2~|~02/NFP~|~LED lighting upgrades. 84416~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. HOC 93 14.66-23.42. Rural other federal aid funded 80 federal/20 state. 84416~|~1~|~2~|~02/S<2~|~Resurfacing project using an asphalt overlay treatment. HOC 93 13.08-13.85. Urban other federal aid funded 80 federal/20 local match. 84416~|~1~|~3~|~03/S<2~|~Resurfacing project using an asphalt overlay treatment. HOC 93 13.85-14.66. Urban other federal aid funded 80 federal/20 state. 114813~|~1~|~1~|~01/SAF~|~Convert the four lane section of SR 48 to a three lane section with a TWLTL. Add bus pull offs, on-street parking, curb extensions, and high visibility pedestrian crossings throughout the corridor. Twp segment. 114813~|~1~|~2~|~02/SAF~|~Convert the four lane section of SR 48 to a three lane section with a TWLTL. Add bus pull offs, on-street parking, curb extensions, and high visibility pedestrian crossings throughout the corridor. City of Dayton segment. 84277~|~1~|~1~|~01/NFA~|~Replace existing twin CMPs at two locations (COL-558-0642, SFN 1505645 and COL-558-0980, SFN 1505793). 115008~|~1~|~1~|~01/CMQ/BEAV~|~Widening of Kemp Road from Meadowcourt to Bluewing from 2 to 3 lanes. Addition of sidewalk to both sides of the roadway. 91036~|~1~|~1~|~01/MPO~|~Minor rehabilitation 120592~|~1~|~2~|~02/NHS~|~All work on NHS bridges. 2 bridges total. 120592~|~1~|~1~|~01/STR~|~All work on bridges classified on the Rural STP system and that are atleast 20 ft long. A total of 9 bridges in this split. 120592~|~1~|~3~|~03/NFA~|~All work on bridge 3301931 which does not meet the 20 ft length requirement to use federal funds. 94946~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split. 83911~|~1~|~2~|~02/S>2~|~Approach work and replace reinforcing steel and other bridge work SFN 1201492 83911~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items on State Route 41 from SLM 4.97 to 12.04 (segment length 7.07 total lane miles 14.14). From the North Corporation Limit of South Charleston SLM 4.97 to SLM 12.04. 103690~|~1~|~1~|~01/SAF~|~Erect new guardrail and replace substandard guardrail on various county roads in Clinton County. 115291~|~1~|~1~|~01/NHS~|~This plan split includes all work associated with constructing the shared use path within the project limits 114541~|~1~|~1~|~01/NHS~|~Resurfacing on the NHS sections 118856~|~1~|~1~|~01/NHS~|~plan split. 121887~|~1~|~2~|~02/S5K~|~All sidewalk work along federal aid routes including SR 613 and CR 220. 121887~|~1~|~1~|~01/NFA~|~All sidewalk work along local non federal aid routes within the village. 87333~|~1~|~1~|~01/STR~|~3603245 HIG SR138 27.24 Intersect: Rattlesnake CreekDeck Repair/Replace80 Fed/20 State. 01/STR/BR/State 91295~|~1~|~1~|~01/STR~|~Landslide repair. Includes FHWA ER funds and Fed/State GSM funds. Work includes landslide repair with a minor re-alignment. WAS SR 821 3.68-4.39. ER funds 80% Federal and 20% State Emergency funds. 103975~|~1~|~1~|~01/STR~|~LAW SR 141 16.94 (SFN 4402618) bridge replacement. 93513~|~1~|~3~|~03/S<2~|~Rehabilitation of Northland Boulevard between Waycross Road and SR-4 including partial and full depth pavement repair, as needed, resurfacing, adjusting drainage structures to grade, replacement of deteriorated sidewalks and curbs, installation of new pavement markings, etc. 93513~|~1~|~1~|~01/ENH~|~Streetscape improvements including new identification signage via feature poles at key locations, vehicular directional signage, landscaping improvements within existing medians, up-lighting, installation of pavers within landscaped medians, addition of a METRO bus stop shelter, and installation of benches and trash receptacles. All improvements to take place within existing right of way 93513~|~1~|~2~|~02/CMQ~|~New decorative mast-arm signals, master controller, contdown LED pedestrian signal heads, LED vehicular signal heads, ADA ramps, emergency vehicle pre-emption, uninterruptible power supply, fiber optic interconnect, installation of PTZ cameras for traffic management, illuminated street name signs, and video detection. 79901~|~1~|~1~|~01/NHS~|~4801490 LUC SR25 5.04 Intersect: Delaware Creek 103429~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4. 111096~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) \ 4PS7 (20% State) - No CAP - Replacement of SFN 3000605. 100799~|~1~|~2~|~02/NHS~|~Rehab of BUT-129-1958 structure 100799~|~1~|~1~|~01/STR~|~Rehabilitate bridge size culvert at PRE-122-0205 100799~|~1~|~3~|~03/S5K~|~Plan split for all costa associated with BUT-122-0835 in Middletown. 110482~|~1~|~1~|~01/SAF~|~Safety funds Plan split 110482~|~1~|~2~|~02/SAF~|~District funded - Environmentally required landscaping along ditch 96105~|~1~|~1~|~01/NFP~|~Wash Bay 121069~|~1~|~1~|~01/MPO/MOGA~|~Resurfacing. 95533~|~1~|~1~|~01/STR~|~BRO US68 resurfacingOn US68, begin (SLM 22.37) 2.09 miles north of Georgetown, north ghrough Mt. Orab to Mt. Orab corp limit (SLM 31.34), it is proposed to resurface the highway with asphalt concrete.Pave Thru:0801593 23.050801623 23.930801690 27.610801720 30.0980/20 95533~|~1~|~2~|~02/STR~|~Rehab0801658 25.590801763 30.72 95533~|~1~|~3~|~03/NHS~|~BRO 32 5.23 0801798 84538~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. HOC 328 5.93-10.56. Rural other federal aid funded 80 federal/20 state. 84538~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. HOC 328 10.56-11.23. Urban other federal aid funded 80 federal/20 state. 84538~|~1~|~3~|~03/NFA~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. HOC 374 17.91-25.26. Not on any federal aid system funded 100% state. 112569~|~1~|~1~|~01/NFP~|~RPM plan split 96501~|~1~|~2~|~02/NHS/DOVE~|~NHS portion of project which is all SR 800 work; Wooster Ave from Front to Slingluff. 96501~|~1~|~1~|~01/S<2~|~Non-NHS portion of project which is all of Woster Ave north of Slingluff. 102113~|~1~|~1~|~01/SAF~|~Provide RRFB and necessary sidewalk and crosswalk work 87527~|~1~|~1~|~01/BRF~|~bridge replacement 123434~|~1~|~1~|~01/S5K~|~Rehabilitation of the Broad Street Bridge (SFN 2331659). 115786~|~1~|~1~|~01/SAF/CCEO~|~Reconstruction of Clarksville Road (CR 10) including widening pavement and shoulders, improving horizontal and vertical geometry, and removing fixed objects from the clear zone. 94879~|~1~|~1~|~01/SAF~|~Placement of a warning sign in both directions to aid in the safe crossing of SR 235. SLM 0.5771 to 05.899 120930~|~1~|~1~|~01/NFP~|~Tree stump and pruning. 117305~|~1~|~1~|~01/NFA~|~Plan split for resurfacing of the road for the LaDue Lake boat launch. 108672~|~1~|~1~|~01/S<2~|~Reconstruction with some widening of Union Street between SR 682 and Shaffer Street (0.00-0.94). 95% Federal (w/TRC) and 5% Local funded. 108672~|~1~|~2~|~02/S<2~|~Construction of new access road. ARC funded. 110769~|~1~|~1~|~01/NHS~|~Landslide repair. MEG 7 18.70-18.72. 100% State ER funded. 92001~|~1~|~1~|~01/NHS~|~Bridge repair. ATH 682 6.07 (SFN 0504920). NHS Structure. Work includes abutment repair, deck replacement, and approach slab work. 100493~|~1~|~1~|~01/STR~|~HIG 247 (6.38-11.08) 100493~|~1~|~2~|~02/S<2~|~HIG 247 (11.08-11.74) 123334~|~1~|~1~|~01/STR~|~NOB-INVASIVE SPECIES VEGETATION MANAGEMENT THROUGHOUT NOBLE COUNTY. 88984~|~1~|~1~|~01/STR~|~HIG SR138 0.00 - 7.03 resurfacing projectBegin project @ intersection of SRSR138/134. Brdg's to pave thru:3602974 HIG SR138 0.54 Intersect: Ruble Run3603016 HIG SR138 1.85 Intersect: Ruble Run80/20 split 109757~|~1~|~1~|~01/MPO/HAM~|~Plan split 1 covers OKI funds awarded to the City of Hamilton to construct trail from existing trailhead on N. Gilmore Road to Bilstein Blvd. 109757~|~1~|~2~|~02/MPO~|~Split 2 is for OKI funds awarded to MetroParks of Butler County for construction of the shared use trail from Bilstein Blvd. to SR 4 Bypass where it ties into the existing M2M trail. 115794~|~1~|~1~|~01/MPO~|~TLCI Intersection Improvement eligible work. 107409~|~1~|~1~|~01/BRO~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - BR Eligible - Rehabilitation of SFN 4502825 carrying US 62 over CSX Railroad 116237~|~1~|~1~|~01/S<2~|~Overlay in ROS. 92824~|~1~|~1~|~01/SAE~|~Guardrail upgrade on various local county roads. 78343~|~1~|~2~|~02/SAF~|~80/20 fed/state funding split for all work using safety funds. 78343~|~1~|~1~|~01/ERD~|~80/20 fed/state funding split using earmark funds. 95126~|~1~|~1~|~01/NHS~|~ SFN 0602973, AUG 198-0860 - Rebuild right deck edge using anodes & patch abutment and top of backwall. Deck overlay using SDC. 95126~|~1~|~2~|~02/NFA~|~SFN 54000481 MER 33 1250. Rebuild left deck edge using anodes. 104769~|~1~|~1~|~01/NFP~|~2 year lighting contract for POR, STA and SUM Counties. 99805~|~1~|~1~|~01/NFP~|~Vehicle Purchse Trumbull County 115658~|~1~|~1~|~01/STR~|~Pavement resurfacing and markings utilizing CSTP (4B77) funds at 80% - Rural area. 115658~|~1~|~2~|~02/S<2~|~Pavement resurfacing and markings utilizing CSTP (4B77) funds at 80% - Urbanized area. 108874~|~1~|~1~|~01/NHS~|~Urban Paving mill and fill on USR 68 5.36 to 6.57 USR 68 6.70 to 6.93 108108~|~1~|~1~|~01/NFA~|~The County will widen and reconstruct parts of Front Street from Malta Village, north to 3rd St, widen the turning radius from Front onto 3rd. 89077~|~1~|~1~|~01/IMS~|~Ohio's Share of Construction. 89077~|~1~|~2~|~02/IMS~|~This plan split covers bridges that are being rehabbed. 91013~|~1~|~1~|~01/BRF~|~SFN 7841485 Nelson Moser Rd CR122 over mahoning river 107323~|~1~|~1~|~01/NFP~|~Split for mowing work 98464~|~1~|~1~|~01/STR~|~Rebuilding and repairing of guardrail as directed throughout District 11. 98464~|~1~|~2~|~02/SAF~|~This plan split for CO CO 03 is for the replacement of the type A anchor assemblies on the NHS system in District 11. 112746~|~1~|~1~|~01/MPO~|~Resurfacing project in the City of Wooster - Large City Funds 119242~|~1~|~1~|~01/STR~|~Rural Plan Split 114090~|~1~|~1~|~01/NFA~|~Created for J&C involvement 112924~|~1~|~1~|~01/STR~|~UNI-37 from 6.90 to 9.14. UNI-47 from 13.55 to 14.14 and 14.21 to 15.00. 115953~|~1~|~1~|~01/MPO~|~Lagrange resurfacing from Greenbelt Pkwy to Summit Street 121796~|~1~|~1~|~01/SAF~|~PM on various CR. 88997~|~1~|~1~|~01/BRF~|~Bridge replacement of SFN1766503 muni bridge over Paramour Creek 88997~|~3~|~3~|~03/S<2~|~For 100% Local Items 88997~|~2~|~2~|~02/S<2~|~Road work associated with the bridge replacement 97839~|~1~|~2~|~02/BRO~|~OBPP - Replacement of SFN 0731250. 97839~|~1~|~1~|~01/BRO~|~OBPP - Replacement of SFN 0731269. 112286~|~1~|~1~|~01/BRF~|~Bridge replacement on PIK-CR77-2.07 (SFN 6631312)This is a Ohio Bridge Partnership Program project. 77269~|~1~|~3~|~03/IMS~|~Construction of noise walls, within the City of Akron, Summit County, Ohio. 77269~|~1~|~4~|~04/IMS/Akrn~|~100% City of Akron items. 77269~|~1~|~5~|~05/IMS/AT&T~|~100% AT&T items. 77269~|~1~|~1~|~01/IMS~|~Reconstruct IR-76/77, and change the access points and geometry of the Main/Broadway and Wolf Ledges/Grant Interchanges, in the City of Akron, Summit County, Ohio. 77269~|~1~|~2~|~02/IMS~|~Replacement of eight structures in the City of Akron, Summit County, Ohio. SFN#7703309, SUM-76-10.34. SFN# 7703333, SUM-76-10.37. SFN# 7703244, SUM-76-10.41. SFN# 7703155, SUM-76-10.43. SFN# 7703279, SUM-76-10.44. SFN# 7760167, SUM CR006460-1.05. SFN# 7703120, SUM CR00648-0.04. SFN# 7703090, SUM CR00649-1.09. 77269~|~1~|~6~|~06/IMS~|~Ongoing Engineering split. 77269~|~1~|~7~|~07/IMS~|~Maintenance of Traffic adjustments on the Akron Beltway system, including striping, portable barrier, etc. 77269~|~1~|~8~|~08/IMS~|~Heat straightening and beam splicing after mid-December collision with flatbed truck carrying a bulldozer. 100443~|~1~|~1~|~01/NHS~|~Deck SealingJAC 32 5.60 4001656JAC 32 5.60 4001680JAC 32 2.98 4001710JAC 32 2.98 4001745JAC 32 4.78 4001834JAC 32 4.78 4001869JAC 32 11.13 4001893JAC 32 11.13 4001923JAC 32 11.29 4001958JAC 32 11.29 4001982JAC 32 11.75 4002040JAC 32 11.75 4002075JAC 32 12.55 4002164JAC 32 12.55 4002199JAC 32 17.12 4002245JAC 32 17.12 4002253 114510~|~1~|~1~|~01/STR~|~Resurfacing portions of CLI-124 + CLI-134 + CLI-729 in the project 102881~|~1~|~1~|~01/S<2~|~Resurfacing of BEL-40 including microsurfacing and pavement markings. 119259~|~1~|~1~|~01/S5K~|~Mowing. 110995~|~1~|~1~|~01/SAF~|~Construct shared use part as part of GMRT 103056~|~1~|~1~|~01/IMS~|~Split covers rehab work on twin bridges SLM 48.02/48.03 98837~|~1~|~1~|~01/NFP~|~Added split for signal work 109059~|~1~|~1~|~01/STR~|~LOR SR 082 06.43/MED SR 0003 22.16 109059~|~1~|~2~|~02/NHS~|~LOR SR 0058 22.63/ MED SR 0018 07.78. 84318~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a double microsurfacing treatment. VIN 93 7.47-10.25. Rural other federal aid funded 80 federal/20 state. 123397~|~1~|~1~|~01/STR~|~Rural 93124~|~1~|~1~|~01/NHS~|~"01/NHS/OT " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail Upgrade on 1) Cos-US 36-19.10 to 19.41; 2) Cos-SR 16-00.54 to 10.05; 121418~|~1~|~1~|~01/NHS~|~Plan split for NHS portion of WIL-20 121418~|~1~|~2~|~02/STR~|~Plan split for non-NHS portion of WIL-20 112470~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 684 0.19, CFN 1819550. Rural federal aid funded 80 Federal/20 State. 110710~|~1~|~1~|~01/NHS~|~Resurfacing. 110710~|~1~|~2~|~02/NHS~|~Minor bridge rehabilitation > 20' span. 110710~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 110566~|~1~|~1~|~01/STR~|~Rehabilitate bridge over Dry Run replace superstructure, pier caps, abutment caps, and encase piling 111632~|~1~|~1~|~01/NFP~|~Crack sealing of various routes throughout the district. 99649~|~1~|~1~|~01/S>2~|~Timber debris removal for bridge BUT-122-0606 (SFN 0902209). 105207~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 534 from 0.00 to 3.39 105207~|~1~|~2~|~02/STR~|~See linked structure > 20' span. 105207~|~1~|~3~|~03/STR~|~See linked structure 10' to 20' span. 109516~|~1~|~2~|~02/S>2~|~Plans split for Non NHS pavements - US 20 109516~|~1~|~1~|~01/NHS~|~Plans split for NHS section - SR 25 109516~|~1~|~3~|~03/NFP~|~100% City of Perrysburg items - pavement repair and curb ramp items 119661~|~1~|~1~|~01/NFP~|~Plan split for construction engineering 105815~|~1~|~1~|~01/IMS~|~Added split 1 for work on the interstate system 94071~|~1~|~1~|~01/NFA~|~Construct a new 40 X 60 three sided storage shed at the Enon Outpost. 106106~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: UNI-4-13.61-14.06 UNI-31-0.00-1.51 97863~|~1~|~1~|~01/MPO~|~Resurfacing Steels Corners Road from State Road to Wyndam Ridge Drive, in the City of Cuyahoga Falls. 86481~|~1~|~2~|~02/S>2~|~All items of work for the new bridge being constructed under the railroad tracks. 86481~|~1~|~1~|~01/S>2~|~Multiple funding sources for pavement eligible work items:* 80/20 federal/local funding split - earmark (capped)* 80/20 federal/local funding split - MPO STP (capped)* 100% State TRAC funds* 100% Local - Cleveland (only if the City request and at their cost) 86481~|~1~|~3~|~03/ENH~|~80% fed / 20% local funding split using MPO Enhancement funds. 84659~|~1~|~4~|~04/NHS~|~See linked structures. 84659~|~1~|~2~|~02/NHS~|~Resurfacing STA SR 21 from 5.14 to 9.76 84659~|~1~|~1~|~01/IMS~|~Resurfacing SUM IR 77 from 21.99 to 24.20. 84659~|~1~|~3~|~03/IMS~|~See linked structures. 109688~|~1~|~1~|~01/S<2~|~Resurfacing SR 416 96931~|~1~|~1~|~01/IMS~|~Slide repair project. WAS-77-5.88. Interstate route funded 90 federal/10 state. 122753~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 117598~|~1~|~1~|~01/BRF~|~Bridge replacement. All work is included in this plan split. 96900~|~1~|~1~|~01/NFA/ADA~|~Adams County Guardrail Project- CEAO - 100% Fed. 116820~|~1~|~1~|~01/IMS~|~Concrete pavement repairs. 116820~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance. 97760~|~1~|~1~|~01/NFP~|~Construct new Jeffersonville Outpost in Fayette County 124385~|~1~|~1~|~01/NFA~|~Resurface multi use trail 112264~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 26 & 27 98605~|~1~|~2~|~02/NFA~|~Split for paving the Burton Facility 98605~|~1~|~1~|~01/NFP~|~Plan split for paving using system preservation 110827~|~1~|~1~|~01/SAE~|~Safety fund split 100933~|~1~|~1~|~01/STR~|~PLan Split for the pavement repairs on PRE-127 and PRE-726 121092~|~1~|~1~|~01/S>2~|~STP >200,000 Plan Split 113301~|~1~|~1~|~01/MPO~|~work eligible for federal-aide 92750~|~1~|~1~|~01/NFA~|~Bridge replacement project funded by CEAO. MRG CR 20 0.63, SFN 5830443. Work includes approach relocation. Federal 95% (15% credit bridge) and Local 5%. 119115~|~1~|~1~|~01/S>2~|~Resurfacing. 92117~|~1~|~1~|~01/STR~|~WOO-199 97657~|~1~|~2~|~02/STR~|~Resurfacing COL-558 from SR 7 to SR 46 including asphalt overlay, pavement repairs and pavement markings. 97657~|~1~|~1~|~01/NFA~|~Resurfacing of COL-558 from SR 45 to SR 517 including asphalt overlay, pavement repairs and pavement marking. 114217~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span. 121255~|~1~|~1~|~01/NFA~|~Created for J&C involvement 112859~|~1~|~1~|~01/STR~|~Overlay on SCI 73 83110~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation funding for resurfacing of Muskingum US 22 from the 00.00 to the 07.16 and SR 83 from the 25.98 to the 27.65. The ADA ramps in the Village of New Concord are the responsibility of the District. There are no funding CAP's. 83110~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - Geological Site Management Funding 4SF7 (80% Federal) / 4SS7 (20% State) - CAP = $150,000.00 per 11/17/2011 approval to transfer from PID 89374 - Slip repairs at Mus-US 22-06.42/06.61/06.80 92972~|~1~|~3~|~03/NFA~|~"03/NFA/OT/ " - District Preservation Marking Pavements 4PS7(100% State) - No CAP - Marking Pavements after resurfacing on Lic-SR 657-00.00 to 01.95 92972~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation Marking Pavement 4PS7 (100% State) - No CAP - Marking Pavements after resurfacing on 1) Lic-SR 657-01.95 to 14.91; 2) Kno-SR 657-00.00 to 04.93 92972~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Lic-SR 657-00.00 to 01.95 92972~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7 (100% State) - No CAP - Resurfacing on 1) Lic-SR 657-01.95 to 14.91; 2) Kno-SR 657-00.00 to 04.93 101135~|~1~|~1~|~01/STR~|~AC Overlay without repairs 101135~|~1~|~2~|~02/IMS~|~Friction improvements to the I-70/SR 235 Interchange; Ramps D, E, G, & H. Pavement will include a percentage of Ontario Trap Rock 119908~|~1~|~1~|~01/STR~|~Project to address flooding location by improving drainage and realigning vertical roadway profile at ATH 56 0.90-1.10. Funded 80% Federal Protect/20% State. 101077~|~1~|~1~|~01/IMS~|~Concrete Pavement Repair on POR IR 76 0.00 to 1.57. 105455~|~1~|~1~|~01/STR~|~WAY-83-16.31 to 25.43 (Includes Major 2 Funds) 109860~|~1~|~1~|~01/NHS~|~Seal concrete bridge decks throughout District 11. 97040~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 98180~|~1~|~1~|~01/STR~|~STP Rural Bridge Replacement Non-BR MAR-231-1.04 over Owings Ditch 120125~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 106601~|~1~|~1~|~01/BRF/GCEO~|~"01/BRF/BR/GCEO" - Guernsey County Engineer project to replace bridge Gue-TR361-0.92 (SFN 3030539) using the Federal/State Exchange Program with state max of $978,400 funded at 80% 101958~|~1~|~1~|~01/S<2~|~This plan split is for STP < 200000 MOT US 40 14.44 - 19.26 101958~|~1~|~2~|~02/NHS~|~This plan split is for NHS route MOT US 40 14.32-14.44 108079~|~1~|~1~|~01/STR~|~General plan split. Splits will become more descriptive when locations are determined. 93744~|~1~|~1~|~01/STR~|~Pavement 93744~|~1~|~2~|~02/SAF~|~Roundabout at SR159 & SR180 Intersection. 117351~|~1~|~1~|~01/S5K~|~Bridge Rehab 107591~|~1~|~1~|~01/NHS~|~Upgrade the traffic signal hardware at TUS 250 21.73 107591~|~1~|~2~|~02/S<2~|~This plan split is for the traffic signal upgrade at COL 62 2.86; COL 13.26; COL CR 447 3.39 107591~|~1~|~3~|~03/STR~|~This plan split is for the traffic signal hardware upgrade at HOL 39 28.25 123549~|~1~|~1~|~01/MPO~|~City of Grove City - Connect northern leg of Haughn Road to N Meadows Drive with an overpass over IR 71. 95402~|~1~|~1~|~01/BRF/PIK~|~It is proposed to rehab SFN 6631401, on CR85 (Tennyson Road (Old SR772)).80/20 Split CEAO project 91101~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 91101~|~1~|~2~|~02/NHS~|~Bridge Maintenance Work 91101~|~1~|~3~|~03/SAE~|~Rest area work. 86755~|~1~|~1~|~01/SAF~|~Signals 123509~|~1~|~1~|~01/STR~|~Replacement of superstructure SFN 6402097 along SR 204 in Perry County. 107833~|~1~|~1~|~01/STR~|~District Emergency Preservation Project - 4PS7 (100% State) until Federal Declaration Then switch to 4BY7 (100% Federal) - No CAP - Hill side slip above Gue-US 40-14.31 91032~|~1~|~1~|~01/MPO~|~Signals 115429~|~1~|~1~|~01/ENH~|~Shared Use Path construction along CR 23 utilizing Federal TAP Funds at 95%. 94438~|~1~|~1~|~01/S<2~|~Bridge - Major Rehabilitation 94438~|~2~|~3~|~03/SAF~|~Plan Split for 100% City items, mostly water work items that aren't federally eligible items. 94438~|~2~|~2~|~02/SAF~|~Plan Split for Roundabout ConstructionPriority 1 is for Luminaire, Conventional, Solid State (LED), As Per Plan (Alternate 2) 118948~|~1~|~1~|~01/NHS~|~Resurfacing. 118948~|~1~|~2~|~02/NHS~|~Minor bridge work. 87214~|~1~|~1~|~01/STR~|~3604322 HIG SR753 16.64 Intersect: Opossum Run80 fed/20 state01/STR/BR/State 95149~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7/0005 (100% State) - No CAP - FY2017 Maintenance project for application of Spray Thermo pavement markings on the NOFAS-Rural Routes 99871~|~1~|~2~|~02/CMQ~|~From SLM 18.94 to 19.23 - From Sta 30+25 to Copland Ave 99871~|~1~|~1~|~01/MPO~|~LUC-US24 from 18.56 to 18.94 - AWT to Sta 30+25 113429~|~1~|~1~|~01/SAE~|~Safety funded Plans split 100763~|~1~|~2~|~02/NHS~|~Structures less than 20 feet span 100763~|~1~|~1~|~01/NHS~|~Deck overlay and/or railing repair on four structures 95490~|~1~|~1~|~01/STR~|~01/STR/OT ; Plan split for 80% federal and 20% state funded culvert work using the culvert SACs 4CW7 and 4CV7. 118123~|~1~|~1~|~01/MPO~|~MPO STBG and CRSSA funding 118949~|~1~|~1~|~01/SAF~|~Install mast arm mounted Rectangular Rapid Flashing Beacons and pedestrian refuge islands on the north legs of the Cleveland Avenue intersections with E Dunedin Road and Dunbar Drive-Piedmont Road. 118865~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. 83533~|~1~|~1~|~01/BRF~|~BR eligible bridge replacement on McLean Mill Road over Big Darby, on new alignmentSFN 6533167, PIC TR127-2.36, Big Darby 102453~|~1~|~1~|~01/NHS~|~Increase the storage (decel length) on the north and southbound off ramps from State Route 8 to Howe Road to eliminate queuing from the ramp intersections. 106445~|~1~|~1~|~01/SAF~|~SR 91 improvements between Barlow Road and Veterans Way. 101382~|~1~|~1~|~01/NFP~|~Tree removal/pruning for District 8. 112958~|~1~|~2~|~02/S>2~|~DEL-36 from 22.17 to 22.84 112958~|~1~|~3~|~03/STR~|~DEL-36 from 22.84 to 25.51 and 26.43 to 28.61 112958~|~1~|~1~|~01/NHS~|~DEL-36 from 18.39-19.90 and 20.26-21.46 98107~|~1~|~1~|~01/STR~|~Spot Paving various locations in District 11. 102330~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 102330~|~1~|~3~|~03/NHS~|~Minor bridge rehab > 20' span. 102330~|~1~|~1~|~01/NHS~|~Resurfacing. 102330~|~1~|~4~|~04/NFP~|~Bridge hit repairs. 116216~|~1~|~1~|~01/NHS~|~Converting US 22 2-lane section to 4-lane divided highway 118699~|~1~|~1~|~01/STR~|~MRG 78-10.96 165 ft. landslide repair with drilled shafts. 92408~|~1~|~1~|~01/IMS~|~Slide repair at SUM-IR271-10.22 in Summit County, Ohio. 116338~|~1~|~1~|~01/STR~|~Plan Split for the Rural locations 106654~|~1~|~1~|~01/ENH~|~Sidewalk reconstruction and street light replacement in the City of Logan. Total length of work 0.35 miles. Funded 95% federal/5% local. 109057~|~1~|~1~|~01/STR~|~Traffic Signal Replacement. 109057~|~1~|~2~|~02/S>2~|~Traffic Signal Replacement. 87694~|~1~|~1~|~01/NHS~|~Bridge Repair 104968~|~1~|~1~|~01/STR~|~Plan Split for Bridge PIC-316-4.31 120990~|~1~|~1~|~01/NHS~|~Resurfacing. 120990~|~1~|~2~|~02/STR~|~Resurfacing. 120990~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 110444~|~1~|~1~|~01/SAF~|~Improvements at the intersection of DEL US 36 at Wilson Rd 116108~|~1~|~1~|~01/SAF~|~Pedestrian safety improvements in front of Vinton County High School. VIN 50 16.57-16.72. Safety Funded. 107563~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7 112845~|~1~|~1~|~01/NHS~|~DEL-23 from 10.81 to 14.37 (excluding Urban System) 112845~|~1~|~2~|~02/S50~|~Urban System (City of Delaware) Plan Split 109834~|~1~|~1~|~01/NFA~|~LAW 775 9.53-18.50 109834~|~1~|~2~|~02/NFA~|~Bridge preventative maintenance 103330~|~1~|~1~|~01/NHS~|~Retaining wall maintenance and repairs. 92737~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 1.95-1.99. 80% Federal and 20% State. 111219~|~1~|~1~|~01/MPO~|~MPO funded plan split 111219~|~1~|~2~|~02/NFP~|~Additional pavement on Main St to be paid by LPA thru OPWC funds 121206~|~1~|~1~|~01/S5K~|~Major Bridge Rehab 110274~|~1~|~1~|~01/NHS~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 21.86-22.20. NHS route funded 80 federal CMAQ/20 local. 110274~|~1~|~2~|~02/SAF~|~Add supplemental signal heads for southbound (Acme) traffic. The project will also shift the existing signal heads to better align them with the Acme approach. An RRFB (rectangular rapid flashing beacon) will be added to the Jefferson St crosswalk. 114598~|~1~|~1~|~01/STR~|~Overlay on BRO 68 77413~|~1~|~1~|~01/IMS~|~Split for the pavement portion of the project. 77413~|~1~|~3~|~03/IMS~|~Split for the bridge portion of the project eligible for BR funds: 1808192, 1800183 77413~|~1~|~2~|~02/IMS~|~Split for the bridge portion of the project: 1808222, 1800213 92733~|~1~|~1~|~01/NFA~|~To perfrom microsurfacing/crack sealing of roads and parking lots in the following ODNR park areas (see PID 91814): 1.) Lake La Su Ann in Willams County - microsurfacing 2.) Oxbow Wildlife Area in Defiance Co. - microsurfacing (D-3) 3.) Fulton Lake in Fulton Co. - crack sealing 116647~|~1~|~1~|~01/NHS~|~SAN-20 116647~|~1~|~2~|~02/STR~|~SAN-6 95674~|~1~|~1~|~01/S>2~|~Douglas Rd from Sylvania Ave to Laskey Rd 95674~|~1~|~2~|~02/NFP~|~Cost above caps and for items paid for with 100% local (waterline) 117244~|~1~|~1~|~01/SAF~|~Shoulder widening and vertical profile improvement on GAL 850 0.21-1.87 and GAL 850 3.51-4.61. Includes rumble stripes. Safety funded. 101481~|~1~|~1~|~01/NHS~|~DSR# COL-003 85365~|~1~|~1~|~01/ENH~|~"01/ENH/OT/HCPD" - Project termini from US 62 near Brinkhaven to CR 25 at Glenmont (~7.47 miles). Construct combination bicycle/buggy/pedestrian path on abandoned railroad bed. 16' wide trail plus 2 foot paved shoulders. Includes work on five bridges/culverts and one new culvert at CR75 (6 structures total). (Using OH384 earmark for design.) Phase 5C programmed under PID 86052. 84491~|~1~|~1~|~01/IMS~|~Resurfacing and pavement repair on I-71 from Sr 126 to north of Pfeiffer Road. Highway signing to be included in this plan split. 84491~|~1~|~2~|~02/IMS~|~Work to include all bridge costs associated with Bridges HAM-71-1581L and HAM-71-1581R. 99657~|~1~|~1~|~01/S>2~|~Resurfacing work funded at 80% federal and 20% state 105517~|~1~|~1~|~01/S>2~|~Generic Plan Split for urban routes in the project. 106359~|~1~|~1~|~01/S<2~|~Landslide repair 113268~|~1~|~1~|~01/MPO~|~Split 1 for MPO-funded resurfacing work 113268~|~1~|~3~|~03/NFP~|~Plan split for landscaping and other work at 100% local cost. 113268~|~1~|~2~|~02/SAF~|~Plan split for pedestrian safety improvements & sidewalk connectivity. 118870~|~1~|~1~|~01/STR~|~plan split 118870~|~1~|~2~|~02/S5K~|~STP plan split. 118870~|~1~|~3~|~03/NHS~|~NHS plan split to linked roadway/bridges. 123856~|~1~|~1~|~01/NFP~|~Districtwide plan split. 80556~|~1~|~2~|~02/NFP~|~Painting the Big and Little Lucas Cranes. 80556~|~1~|~1~|~01/BRO~|~4805917 LUC SR65 5.35 Intersect: MAUMEE R CSX RR SUMMIT 124898~|~1~|~1~|~01/ENH~|~MPO TAP funding 118790~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay without Repairs including bridge maintenance ERI-2-7.72 to 15.739 118790~|~1~|~2~|~02/S50~|~Asphalt Concrete Overlay without Repairs ERI-4-8.240 to 10.590 87099~|~1~|~1~|~01/S>2~|~Crack Sealing on the General System for FY2015 124099~|~1~|~1~|~01/IMS~|~Bridge Hit Repairs 98009~|~1~|~1~|~01/STR~|~Bridge Replacement 116242~|~1~|~1~|~01/NHS~|~Slide repair. 84727~|~1~|~1~|~01/MPO/TCE~|~Widening and resurfacing of Bedford Road(CR175), including add type 6 curb and storm sewer replacement/upgrade, Trumbull County, Ohio. 113530~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 122860~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing of 11th Street entrance/maintenance facility parking, Crack seal and seal coating of parking lot north of Celeste Center. 122860~|~1~|~2~|~02/NFA~|~Pavement repairs and resurfacing of parking area by the Ohio Village Entrance and Historical Records Storage at the History Connection 123851~|~1~|~1~|~01/SAF~|~100% HSIP funding up to $300,000 for eligible expenses, 100% local after HSIP cap or for ineligible purchases 119487~|~1~|~2~|~02/NFA/LCEO~|~Non-Federal aid eligible items. 119487~|~1~|~1~|~01/MPO/LCEO~|~Reconstruction of Pike Street East of SR 310. 95156~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - District Preservation Block PID - 4PS7 (100% State) - Blcok PID for Construction Inspection costs 83062~|~1~|~2~|~02/STR~|~SCI SR335 Resurfacing Project3.74 to 8.38 Rural portion On SR335, beginning at the RR overpass (SLM 2.64), which is 0.73 mile north of the Portsmouth Corp limit and go north for 8.38 miles (SLM 8.38), it is proposed to resurface the highway with asphalt concrete.Brdgs are pave thru.7304897 SCI SR335 4.36 Intersect: Trib. Of Little Scioto7304951 SCI SR335 6.09 Intersect: Stream7304994 SCI SR335 6.98 Intersect: Blake Hollow80/20 split01/STR/PV/State 83062~|~1~|~1~|~01/SAF~|~SR335 Guardrail & Paved Gutter Safety Project On SR335, 0.05 mile south of Swauger Valley Road to RR overpass. it is proposed to upgrade and relocate guradrail on the east side of SR335 and at the intersection of Swauger Valley Road and install paved gutter on the west side of SR335.This project was PID 93797. Refer to 93797 for PE and RW PhasesCO Phase is 100% Fed Safety Funds01/SAF/OTH/State 83062~|~1~|~3~|~03/S<2~|~SCI SR335 resurfacing project2.64 to 3.74 Urban portionOn SR335, beginning at the RR overpass (SLM 2.64), which is 0.73 mile north of the Portsmouth Corp limit and go north for 8.38 miles (SLM 8.38), it is proposed to resurface the highway with asphalt concrete.Brdg is pave thru.7304838 SCI SR335 2.64 Intersect: CSXT RR80/20 split02/S<2/PV/State 121474~|~1~|~2~|~02/IMS~|~Deck replacement. 121474~|~1~|~1~|~01/IMS~|~Reconstruction of IR 680 and ramps to and from MAH US 62 and 62D, includes culverts and lighting. 121474~|~2~|~3~|~03/IMS~|~Bridge preventive maintenance. 105550~|~1~|~1~|~01/BRF~|~See linked structure >20' span. 94440~|~1~|~1~|~01/STR~|~Bridge Replacement 94440~|~1~|~2~|~02/STR~|~Culvert Replacement 122856~|~1~|~1~|~01/MPO/WARR~|~Resurfacing. 103922~|~1~|~1~|~01/STR~|~Culvert Replacement: HUR-269-2.79 102405~|~1~|~1~|~01/NFA~|~SR 520, SLM 0.00 to 12.51 102405~|~1~|~2~|~02/STR~|~SR 520, SLM 12.51 to US 62 91894~|~1~|~1~|~01/NFA~|~Replacement of a structure on forest road #14 at VIN Zaleski State Forest. 100% State. 16707~|~1~|~1~|~01/BRF~|~CEAO BR funds, bridge replacement of TR24/Rosedale-Plain City Road over Little Darby CreekLocal sponsor - MAD County Engineer4930878 MAD CR24 2.75 Intersect: Little Darby01/BRF/BR/ 121720~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with / without Repairs RIC-13 including bridge maintenance 121720~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs RIC-95 and RIC-97 including bridge maintenanceFine Graded Polymer Asphalt Concrete Overlay (smoothseal) RIC-97-9.619 to 14.686 including bridge maintenance 121720~|~1~|~3~|~03/NHS~|~Local share of funding for pavement repairs within project on RIC-13 in Bellville 121720~|~1~|~5~|~05/STR~|~Local shar of funding for pavement repairs within project on RIC-95 and RIC-97 in Butler 121720~|~1~|~4~|~04/STR~|~Local share of funding for pavement repairs within project on RIC-97 in Bellville 121720~|~1~|~6~|~06/SAE~|~Safety for RRFB installation on RIC-13 in Bellville only 123243~|~1~|~1~|~01/IMS~|~Resurfacing. 123243~|~1~|~2~|~02/NHS~|~Resurfacing. 123243~|~1~|~3~|~03/S>2~|~Resurfacing. 123243~|~1~|~4~|~04/STR~|~Resurfacing. 87255~|~1~|~1~|~01/STR~|~Replace 2 12' bridges over Nickelson Wilson Ditch and County Ditch01/STR/BR/ 108714~|~1~|~1~|~01/STR~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-008 108714~|~1~|~2~|~02/STR~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-009 94161~|~1~|~1~|~01/NHS~|~The project involevs the replacement of the existing bridge (JEF-43-0092, SFN 4102037) superstructure with a new superstructure using weathering steel beams. The approach slabs will also be replaced and the substructure will be repaired as needed. 94161~|~1~|~2~|~02/NHS~|~Added plan split for portion of work on approach pavement to be paid by local entity. 94260~|~1~|~2~|~02/S<2~|~FY2016 Urban Paving in the City of Wilmington on SR 730 from just past Nelson to Truesdell/South/US 68. (CLI SR 730: SLM 10.18 to 11.43). This Plan Split is for all items that are paid at 100% City. 94260~|~1~|~1~|~01/S<2~|~FY2016 Urban Paving in the City of Wilmington on SR 730 from just past Nelson to Truesdell/South/US 68. (CLI SR 730: SLM 10.18 to 11.43) This plan split is for the items that are paid 80% ODOT and 20% City. 83067~|~1~|~1~|~01/NHS~|~Resurfacing of SR-18 from Hametown to IR-77, includes widening of SR-18 for additional lanes. Ramp widening/relocation of SR-18 Eastbound to SUM IR-77 Southbound. Summit County, Ohio. 83067~|~2~|~3~|~03/NHS~|~Resurfacing of State Route 18 from Medina Line Road to South Hametown Road. Including the installation of TWLTL along the whole corridor. 83067~|~3~|~8~|~08/NHS/FAIR~|~100% City of Fairlawn requested items: including sidewalks, driveways, curbs, etc. 83067~|~2~|~4~|~04/NHS~|~Replacement of structure #7700849, at SUM-SR18-0.54, Bath Township, Summit County, Ohio. 83067~|~1~|~2~|~02/NHS~|~City of Akron water line work. 83067~|~3~|~5~|~05/NHS~|~Resurfacing of State Route 18 from Southbound IR-77 ramp to Western Fairlawn Corporation limit at SLM 2.67. Bath Township, Summit County, Ohio. 83067~|~3~|~7~|~07/NHS/FAIR~|~Partial and Full Depth Repairs that are the responsibility of the City of Fairlawn under urban paving. 83067~|~3~|~6~|~06/NHS/Fair~|~Resurfacing of State Route 18 from Western Corp limit (SLM 2.67) to Eastern Corp limit (SLM 4.88), in the City of Fairlawn, Summit County, Ohio. 89439~|~1~|~1~|~01/NFA~|~Replace existing bridge SFN 1239015 CLACR00300 1.61 on Tremont City Road. 105043~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2023. 105043~|~1~|~2~|~02/IMS~|~Guardrail upgrade/replacement project for FY2023. 108397~|~1~|~1~|~01/S<2~|~Rock fall repair from OH18-01 ER event. 120251~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Mt. Vernon Ave, E Spring St, and Martin Luther King Jr Blvd 119265~|~1~|~1~|~01/IMS~|~Mowing 99698~|~1~|~1~|~01/IMS~|~Resurfacing work funded at 90% federal and 10% state 79277~|~1~|~1~|~01/MPO~|~LAW Ironton Storm Sewer System Reconstruct storm sewer system for the on-system streets to reduce the number of overflows into the the wastewater treatment system in the City or Ironton. 80% Fed KYOVA/20% local match Ironton 01/MPO/OT/Ironton 114749~|~1~|~1~|~01/NHS~|~ROS Smoothseal. 116000~|~1~|~1~|~01/IMS~|~GSM funded plan split 117903~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I70-C, LIC 118-126 92716~|~1~|~1~|~01/MPO~|~Resurfacing CR 605 2.63 - 4.32 112548~|~1~|~1~|~01/BRO~|~Plan split to program project. Update with plan split review process prior to plan file. 114897~|~1~|~1~|~01/NHS~|~Resurfacing. 114897~|~1~|~2~|~02/STR~|~Resurfacing 119720~|~1~|~1~|~01/S5K~|~All work included in this split. 107450~|~1~|~1~|~01/IMS~|~AC overlay with repairs on Interstate route:CLA IR 70 SLM 25.11 to 29.25 115183~|~1~|~1~|~01/S>2~|~Plan split for paving work. 115183~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 117170~|~1~|~1~|~01/STR~|~Widening of County Road 82 in Tuscarawas County 107567~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project 97611~|~1~|~1~|~01/STR~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7 108014~|~1~|~1~|~01/CMQ~|~Construction of a bike/ped crossing along Thornton Avenue, across River Road (US-50), existing RR tracks, and connecting into the trail system at Fernbank Park. 115756~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on HAM-22 115756~|~1~|~2~|~02/NHS~|~Plan split for the 80/20 (ODOT/City) items on the NHS portion: SLM 1.11-1.43 115756~|~1~|~3~|~03/MPO/CIN~|~Split for the OKI STBG funded work - road diet on Gilbert from Court Street to MLK. Addition of bike facilities and curb bump outs at intersections. 115756~|~1~|~4~|~04/NHS~|~Added funding event for NHS that is OKI eligible 109303~|~1~|~1~|~01/SAE~|~Install new raised pavement markers 77531~|~1~|~1~|~01/NHS~|~Resurfacing 118690~|~1~|~1~|~01/NFA~|~Excavation of cut slope, ditch drainage improvement and Installation of Geocell wall to address slope failure along SR 555. 96462~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 141 0.00-7.74. Rural other federal aid funded 80 federal/20 state. 92746~|~1~|~1~|~01/NFA~|~Lands & Building state funded project to demolish the old existing salt shed and replace with a new shed 112999~|~1~|~1~|~01/STR~|~Split for bridge replacement work 116841~|~1~|~1~|~01/MPO~|~Plan split for federally eligible funding of Heartland Trail Phase 4A 116012~|~1~|~1~|~01/NFA~|~Replacement of the superstructure with prestressed concrete box beams with a composite concrete deck. Also, minor substructure modifications/repairs, as well as related roadway restoration. 108444~|~1~|~1~|~01/CMQ~|~CMAQ Plan SPlit 119105~|~1~|~1~|~01/S>2~|~Resurfacing. 119105~|~1~|~2~|~02/STR~|~Resurfacing. 105250~|~1~|~1~|~01/STR~|~Spot paving project for District 11 94578~|~1~|~1~|~01/NFP~|~Port Clinton lift bridge over the Portage River. 109010~|~1~|~1~|~01/ENH~|~All work in this project. 95% federal funds with Toll Revenue Credit (TRC) from the Transportation Alternatives Program (TAP). The local match and any funds needed after the cap is reached will be provided by the City of Van Wert. 99595~|~1~|~1~|~01/MPO~|~Resurfacing Laird Ave from Youngstown Rd to Atlantic St, Genesee Ave from Market St to Elm Rd, Woodland from Elm Rd to Perkinswood Blvd using rubberized asphalt on asphalt leveling course. Includes incidental drainage work, new pavement markings, sign upgrades and ADA curb ramps. Also includes curb and sidewalk replacements and linear grading where needed. 121485~|~1~|~1~|~01/STR~|~STP Rural Plan Split 121485~|~1~|~2~|~02/S5K~|~STP 5,000 Plan Split 96239~|~1~|~1~|~01/STR~|~STP Rural. SR245: 0.00-7.65; SR347: 4.23-8.10 108007~|~1~|~2~|~02/STR~|~RIC SR 0546-09.00 School Flasher Upgrades 108007~|~1~|~1~|~01/NHS~|~Lighting 84453~|~1~|~1~|~01/STR~|~7305222 SCI SR335 14.52 Intersect: Stream80 fed/20 state 01/STR/BR/State 117269~|~1~|~1~|~01/SAF/HUDS~|~Safety improvements, road diet, restripe to reduce number of through lanes and converting pavement to turn lanes. 100855~|~1~|~1~|~01/STR~|~JAC 279 0.00-11.45 & 11.86-12.48 93511~|~1~|~1~|~01/CMQ~|~2 Park & Ride areas near SR213, SR7 and US22 within ODOTs RW. 100% STP funding from BHJ MPO. One park and ride is going to be expanded and the other one will be new construction. 97687~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 10.49. GSM funded. Not on any federal aid system funded 100% state. 114807~|~1~|~1~|~01/STR~|~MRW-61 from SLM 3.42 to SLM 13.15 109623~|~1~|~1~|~01/S<2~|~Asphalt resurfacing SR 211 109623~|~1~|~2~|~02/S<2~|~100% City Items 121139~|~1~|~1~|~01/STR~|~Resurfacing SR 39 121446~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work on HEN-24 108069~|~1~|~1~|~01/STR~|~Landslide repair as part of 2018 ER event. 111059~|~1~|~1~|~01/MPO/CANT~|~Construction of bike trail along Colonial Blvd NE in the City of Canton. 95290~|~1~|~1~|~01/STR~|~MAD-29-10.09 culvert; MAD-42-21.36 culvert 105537~|~1~|~1~|~01/STR~|~"01/STR/OT/" - Geological Site Management Funding - 4SF7 (80% Federal)/4SS7 (20% State) - Rock scaling at PER-13-8.99 and PER-93-7.72. 107351~|~1~|~1~|~01/STR~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%. 107351~|~1~|~2~|~02/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%. 107351~|~1~|~3~|~03/S5K~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%. 107351~|~1~|~4~|~04/SAF~|~City of Marietta to add traffic detection cameras to intersections WAS SR 7 22.20, WAS SR 7 22.37, WAS CR 50 1.35, WAS CR 50 1.54 and WAS CR 50 1.80. Funded 100% Local. 124989~|~1~|~1~|~01/ENH~|~MPO TAP funding 106424~|~1~|~1~|~01/NHS~|~UPP - 2" AC overlay 123795~|~1~|~1~|~01/NHS~|~NHS 123795~|~1~|~2~|~02/STR~|~stp rural 99088~|~1~|~1~|~01/IMS~|~Work on the interstate system. All work in this project is in this split. All funds from the District Preservation Program budget. 99088~|~1~|~2~|~02/NFP~|~For work in the rest areas. Rest Area funds SAC 4BR7 from ODOT Central Office. 107324~|~1~|~1~|~01/NFP~|~Split for work on the interstate system. 121303~|~1~|~1~|~01/STR~|~All Work is within this split 92226~|~1~|~1~|~01/S>2~|~100% State using District Preservation funding 99719~|~1~|~1~|~01/NFA~|~Bridge maintenance project. Work includes pile encasement on MRG 555 1694, SFN 5801958. Not on Fed. Aid System, 100% State funds. 95545~|~1~|~1~|~01/MPO~|~It is proposed to reconstruct the drainage system and purchase RW easements to the Ohio River.440070027 LAW 00007 2.451440070028 LAW 00007 2.461440070029 LAW 00007 2.501440070030 LAW 00007 2.53440070031 LAW 00007 2.561440070032 LAW 00007 2.651440070034 LAW 00007 2.741440070033 LAW 00007 2.751440070036 LAW 00007 2.871440070037 LAW 00007 2.881440070035 LAW 00007 2.891440070038 LAW 00007 2.931440070039 LAW 00007 2.991440070040 LAW 00007 3.011440070042 LAW 00007 3.14440070043 LAW 00007 3.14440070044 LAW 00007 3.23440070045 LAW 00007 3.311440070046 LAW 00007 3.361440070047 LAW 00007 3.391440070048 LAW 00007 3.391440070049 LAW 00007 3.421440070050 LAW 00007 3.461440070051 LAW 00007 3.461440070052 LAW 00007 3.521440070053 LAW 00007 3.571440070054 LAW 00007 3.601440070055 LAW 00007 3.681440070057 LAW 00007 3.741440070058 LAW 00007 3.741440070059 LAW 00007 3.761440070060 LAW 00007 3.771440070061 LAW 00007 3.821440070062 LAW 00007 3.861440070063 LAW 00007 3.93180/20 Split 95545~|~1~|~2~|~02/MPO~|~This plan split is to cover the cost of unforeseen utility for Aqua Ohio. 120324~|~1~|~1~|~01/NHS~|~Plan split for all work on project 120062~|~1~|~1~|~01/NFA~|~Resurfacing in Fernwood State Forest 87938~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile encasement work on 1) 1601342 COS SR83 19.56 Intersect: Trib Of Turkey Run: Not BR Eligible: Length=48 SD/FO(0) SR=92.4 DSR=7; 2) 1601393 COS SR83 20.27 Intersect: Over Turkey Run: Not BR Eligible: Length=55 SD/FO(0) SR=90.2 DSR=7; 3) 4504607 LIC SR79 1.15 Intersect: Over So Fork Lic River: Not BR Eligible: Length=141 SD/FO(0) SR=98.9 DSR=7; 4) 4505085 LIC SR79 23.89 Intersect: Trib Of Rocky Fork: Not BR Eligible: Length=50 SD/FO(0) SR=87.8 DSR=6; 5) 4505115 LIC SR79 24.21 Intersect: Sr79 Over Rocky Fork: Not BR Eligible: Length=141 SD/FO(0) SR=79.1 DSR=7; 6) 4505158 LIC SR79 25.04 Intersect: Sr79 Over Painter Run: Not BR Eligible: Length=108 SD/FO(0) SR=91.2 DSR=7; 7) 4505174 LIC SR79 26.18 Intersect: Sr 79 Over Painter Run: Not BR Eligible: Length=125 SD/FO(0) SR=80.1 DSR=7; 87938~|~1~|~2~|~02/BRF~|~"02/BRF/BR/ " - State Parks ODNR 4BF7 (State 100%) - No CAP - Rehabilitation on 3026175 GUE 001SP 5.7 M N OF JCT US 22Intersect: OVER SALT FORK LAKE; BR Eligible for Rehabilitation: Length=145 SD/FO(1) SR=58.3 DSR=4 118700~|~1~|~1~|~01/NFA~|~Plan split for bridge rehabilitation work. 81595~|~1~|~1~|~01/S<2~|~4401255 112699~|~1~|~1~|~01/NFP~|~RPM 111003~|~1~|~1~|~01/NFA~|~The VILLAGE will add a 285' eastbound turn lane west of Herman Street along Monroe Street (SR274) to new plant entrance and a 100' westbound left turn lane. The turn lanes will be 11'5" wide with base and asphalt wearing course. 98248~|~1~|~1~|~01/NFA~|~Bridge replacement project. GAL CR 71 0.90, SFN 2742322. Removal of superstructure and selective demolition of piers, abutments and substructure and replacement to include widening to meet federal guidelines with minimal vertical and horizontal alignment modifications. Not on the federal aid system funded 80 federal/20 local. 98248~|~1~|~2~|~02/NFA~|~100% local (lntp) item to fund a plaque on the bridge. 98248~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 90328~|~1~|~1~|~01/TRN~|~100% funding plan split. Funds undetermined at this time. 118774~|~1~|~1~|~01/NHS~|~added plan split. 123591~|~1~|~1~|~01/STR~|~Funding split for STP Rural 115934~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 147 16.83, SFN 6103065. 94139~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 46 from 8.54 to 8.64. 94139~|~1~|~2~|~02/S>2/CANF~|~Resurfacing of MAH SR 46 from SLM 8.81 to SLM 9.29, and US-62 from SLM 7.61 to SLM 8.40. 94139~|~1~|~4~|~04/NHS~|~Resurfacing of US-224 from SLM 11.28 to SLM 11.41, in Canfield Township. 94139~|~1~|~5~|~05/NHS/CANF~|~Resurfacing of US-224 from SLM 11.41 to SLM 12.69 in the City of Canfield. 94139~|~1~|~6~|~06/NHS/CANF~|~100% City of Canfield items per urban paving policy. 94139~|~1~|~3~|~03/S>2~|~Resurfacing of MAH SR46, from SLM 8.64 to SLM 8.81. 100666~|~1~|~1~|~01/STR~|~Chip sealing CAR-39 from SR 524 to JEF Co. Line, CAR-164 from SR 212 to SR 332, CAR-212 from TUS Co. Line to SR 39 and CAR-212 from Leesville NCL to the HAS Co. Line. 100666~|~1~|~2~|~02/NFA~|~Chip sealing CAR-524 from the JEF Co. Line to SR 39. 119101~|~1~|~1~|~01/S>2~|~Resurfacing. 111661~|~1~|~1~|~01/NFP~|~City will construct a full depth replacement of Romig Road between Vernon Odom and Kendale roads as well as widening of 7900 feet of roadway. 111661~|~1~|~2~|~02/NFP~|~OPWC 111661~|~1~|~3~|~03/NFP~|~Summit County 111661~|~1~|~4~|~04/NFA~|~City of Barberton 111661~|~1~|~5~|~05/NFP~|~City of Akron 95365~|~1~|~1~|~01/STR~|~See linked structures >20' span. 94125~|~1~|~2~|~02/S>2~|~Bridge Maintenance SFN 7605994 SR 236 SLM 3.22 over Mudbrook Creek. 94125~|~1~|~3~|~03/S>2~|~Resurfacing of State Route 236 within the Massillon city limits, Stark County, Ohio. 94125~|~1~|~1~|~01/S>2~|~Resurfacing of STA SR 236 from SLM 0.00 to 5.50 (0.00 to 0.41 in the City of Massillon). 110080~|~1~|~1~|~01/STR~|~Repair/replace culverts on rural routes. 110080~|~1~|~2~|~02/S>2~|~Replace/repair culverts on Lrg Urban routes. 75107~|~1~|~1~|~01/MPO~|~MCCord Rd RR grade separation. 75107~|~2~|~2~|~02/MPO~|~This is for part 2 of the plan to address the sanitary sewer. 109098~|~1~|~1~|~01/NFA~|~30 x 50 Fabric Material Storage Building ? Milford Outpost 83654~|~1~|~1~|~01/STR~|~SCI SR 73 8.50 Slide Repair01/STR/OT/State 105532~|~1~|~1~|~01/NHS~|~NHS plan split (MAR-4-13.00-13.81) 105532~|~1~|~2~|~02/S<2~|~City of Marion plan split (MAR-4-13.81-17.21) 105532~|~1~|~3~|~03/STR~|~Rural plan split (MAR-4-17.21-20.49) 93704~|~1~|~1~|~01/S>2~|~80/20 split between federal and local for the resurfacing of Chagrin Road using MPO STP funds. 118523~|~1~|~2~|~02/SAE/EAT~|~Split for pedestrian related infrastructure that will be constructed as part of the project. 118523~|~1~|~1~|~01/S5K/EAT~|~Reconstruction of North Maple Street from East High Street to Mechanic Street. Replacement of curb and storm sewer. 118523~|~1~|~3~|~03/NFP~|~Plan split for 100% local utility work/relocation 98233~|~1~|~1~|~01/IMS/ZANV~|~"01/IR/BR/ZANV" - plan split 01 for Mus-60G-0033 110934~|~1~|~1~|~01/S>2~|~Plan split for paving work 116109~|~1~|~1~|~01/S>2~|~All work associated with this PO is for the scour repair of the WAR-48-1508 bridge size culvert. 98962~|~1~|~1~|~01/STR~|~Scioto FLAP project 108055~|~1~|~1~|~01/NHS~|~Consultant CE contracts 105716~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 113411~|~1~|~1~|~01/SAF~|~ 100% CEAO HSIP funding for upgrading guardrail on county roads 123545~|~1~|~1~|~01/IMS~|~Plan split for work association with preventative maintenance required on multiple interstate bridges 113498~|~1~|~1~|~01/STR~|~Replacement of structure > 20' span. 25622~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1811991 116878~|~1~|~1~|~01/MPO/MASS~|~Resurfacing. 122593~|~1~|~1~|~01/ERD~|~Replace a failed retaining wall in Jackson Hill Park that is impacting the sidewalk and threatening the roadway. Project will also provide improvements to the existing structural stairs that connect Gage Street to Eleanore Place. Also repairs to a landslide along Coy Street. 99960~|~1~|~1~|~01/S<2~|~Replace the traffic signal hardware at SR 7 & SR 213 and at the US 22 ramps & SR 213 in Jefferson County. Install a left turn lane on the US 22 Ramp E approach at the SR 213 & US 22 Ramp E/F intersection. 99960~|~2~|~2~|~02/S<2~|~This plan split is for the installation of the traffic camera equipment. 117096~|~1~|~1~|~01/S5K~|~OVRDC funded resurfacing. 117580~|~1~|~1~|~01/NFA~|~Bridge replacement project. GAL TR 342 0.04, SFN: 2736810. Funded 100% Federal. 94011~|~1~|~1~|~01/NFP~|~Add generator for district garage. 01/NFA/OT/State 114292~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8. 114292~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. 114292~|~1~|~3~|~03/SAE~|~Add guardrail along the south side of US-50 in the curve near SLM 32.40-32.60. 97384~|~1~|~1~|~01/S<2/FIND~|~For work on all streets in this project other than Lima Avenue and W. Lima Street. 97384~|~1~|~2~|~02/NHS/FIND~|~For work on Lima Avenue and W. Lima Street which are Principal Arterials and therefore on the NHS. 110114~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 25.10. 123018~|~1~|~1~|~01/NFP~|~Districtwide systematic lighting upgrades and maintenance. 87659~|~1~|~1~|~01/IMS~|~SFN 8703574 WOO IR75 12.05 Intersect: Portage River North Br - Left SFN 8703604 WOO IR75 12.05 Intersect: Portage River North Br - Right 108261~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. DSR# JEF-006. 103204~|~1~|~1~|~01/STR~|~Test pavement sections on VIN 50 0.07-3.00. 117422~|~1~|~1~|~01/NFA~|~Bridge Replacement project 121518~|~1~|~1~|~01/SAF~|~Signal & lighting replacements 97996~|~1~|~1~|~01/NHS/PATA~|~Resurfacing of SR 16 in Pataskala and minor bridge maintenance. 97996~|~1~|~2~|~02/NHS~|~Resurfacing of Lic-SR 16 outside of city limits 97996~|~1~|~4~|~04/SAF/PATA~|~Reconstruction of traffic signal at SR 16 (Broad Street) and Summit Road and access management improvements. 97996~|~1~|~3~|~03/NHS/PATA~|~Repair and replacement of curb ramps in city of Pataskala 92634~|~1~|~2~|~02/STR~|~STP Rural funding for MAR-95 signal work, SLM 18.48-18.86(Menard's intersection)02/STR/OT/ 92634~|~1~|~1~|~01/S<2~|~STP small urban funding for MAR-95 signal work, SLM 17.05-18.48(From Marion Plaza to Tri-Rivers/Blevins/Success)01/S<2/OT/ 98720~|~1~|~1~|~01/BRF~|~Bridge replacement on TR 72-2.91. 101349~|~1~|~1~|~01/STR~|~bridge rehab. 94110~|~1~|~1~|~01/S<2~|~Resurfacing ATB SR 531 from 6.86 to 7.54 and 10.27 to 18.69. 94110~|~1~|~2~|~02/S<2~|~See linked structures >20' span. 100459~|~1~|~1~|~01/NHS~|~Construct a bike lane on Monument Avenue and complete the bike lane on St. Clair Street from Monument Avenue to the alley north of East First Street. 93260~|~1~|~1~|~01/BRO~|~Overlay bridge deck with latex modified concrete, and raise superstructure to meet required vertical clearance on SFN 5706939 MOT IR 75 0776 East River Road over Interstate 75.. 97241~|~1~|~1~|~01/STR~|~Replace deficient structure with new structure. Investigate use of pre-cast structure. 87098~|~2~|~3~|~03/SAF~|~Widen SR-747 to provide a 450' NB right turn lane, restripe Union Centre Boulevard to provide a 550' EB right turn lane, and replace the traffic signal at SR-747 & Union Centre Boulevard while providing right turn overlaps, providing new signal heads with backplates, and counting and retiming the traffic signal. 87098~|~1~|~2~|~02/NHS~|~Plan split includes all approach, approach slab, and bridge work associated with the following structures: HAM-126-0865L/R, HAM-126-1149L/R and HAM-126-1279 L/R. 87098~|~1~|~1~|~01/S>2~|~Resurfacing a portion of SR 747 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 112284~|~1~|~1~|~01/SAF~|~Installation of single mode fiber optic cable at two locations along Interstate I-275 in Hamilton and Clermont Counties. The work will include adding cable on I-275 from the I-74 interchange, east through the US 27 interchange in Hamilton County.The installation of single mode fiber optic cable and cameras from Montgomery Road (22/3) to SR 28 112284~|~1~|~2~|~02/SAF~|~The installation of singe mode fiber optic cable at the i-275 and SR interchange in Clermont County extending south into Hamilton County and terminating at US 52 Interchange. 121133~|~1~|~1~|~01/IMS~|~D8 mowing locations 104917~|~1~|~1~|~01/NFA~|~North Royalton Schools school bus replacement project 105193~|~1~|~1~|~01/STR~|~Resurfacing of SR 93 and SR 651. 75625~|~1~|~2~|~02/S>2~|~STP Urban Bridges for the following structures: BUT-127-1093 and WAR-22-0357. 75625~|~1~|~5~|~05/IMS~|~Interstate Bridges including the foolwoing: 91,000. 75625~|~1~|~1~|~01/STR~|~STP Rural bridges including the following: CLE-52-0652, WAR-350-0873 and PRE-127-0376. 75625~|~1~|~3~|~03/NHS~|~NHS Bridges including the following: BUT-4-1480L and BUT-4-1488R. 75625~|~1~|~4~|~04/BRO~|~Federal Bridge Fund eligible bridges including the following: BUT-73-1682, WAR-48-2205, and WAR-48-1508. 95752~|~1~|~1~|~01/NHS~|~LUC-US20 from SLM 7.98 to SLM 10.65 124450~|~1~|~1~|~01/NFP~|~Created for ODOT TID Funding 100768~|~1~|~1~|~01/NFP~|~Auxiliary pavement marking on various routes 110890~|~1~|~1~|~01/MPO~|~Replacement of existing pedestrian bridge including installation of an additional pier. 106820~|~1~|~1~|~01/BRO~|~Rehabilitate three bridges (CAR-39-0970, CAR-542-0934 & CAR-542-1275) by replacing deck edges and railing. 101808~|~1~|~1~|~01/STR~|~ADA SR 73 10.38-13.10 101808~|~1~|~2~|~02/SAF~|~Change order to add center-line rumble stripes. 102488~|~1~|~1~|~01/NHS~|~Resurfacing of COL-7 from SR 267 to CR 425 and from SR 46 to Columbiana SCL 102488~|~1~|~2~|~02/STR~|~Resurfacing of COL-7 from CR 425 to SR 46 95233~|~1~|~1~|~01/S>2/PATA~|~MORPC/City of Pataskala project - 4TA7 (80% Federal) / 4BG7 (20% Local) funding - For the reconstruction of Mink Street. 120949~|~1~|~1~|~01/CMQ/MOGA~|~Install new signal at SR 532 and Albrecht Ave in the Village of Mogadore. 111184~|~1~|~3~|~03/S5K~|~Bridge replacement. 111184~|~1~|~1~|~01/STR~|~Bridge replacements 10' to 20' bridges. 111184~|~1~|~2~|~02/STR~|~Bridge preventive maintenance > 20' span. 105594~|~1~|~2~|~02/NHS~|~NHS Bridges (HUR US 0224 15.82, RIC SR 0013 S 16.32, RIC SR 0013 00.08). 105594~|~1~|~1~|~01/IMS~|~MED IR 0071 08.10 112959~|~1~|~1~|~01/STR~|~Overlay on ADA 41. 98029~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CY 2021. Funded 100% state. 99083~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for week control on US 33 on 4 lane and 2 lane - LOG 104042~|~1~|~1~|~01/ERD~|~Construction of a green, complete streets corridor on South Main Street between State Street and Mill Street in the City of Akron, Summit County, Ohio. Project would include roadway and sidewalk replacement, the addition of on-street parking and dedicated bike lanes, a roundabout, traffic improvements, way-finding signage and green infrastructure. 104042~|~1~|~2~|~02/BRO/AKRN~|~Replacement of State Street structure SFN#7760361 in the City of Akron, Summit County, Ohio. 116310~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG TR 231 0.927, SFN 5337542. CEAO funds. 89344~|~1~|~2~|~02/NFP/SOME~|~"02/NFP/OT/SOME" - Village of Somerset Local Requests - 4BG7 (100% Local) - No CAP - 1) Deciduous Plants; 2) Parking Meters; 3) Sandstone Seat Wall 89344~|~1~|~1~|~01/ENH/SOME~|~"01/ENH/OT/SOME" Village of Somerset Enhancement Project - 4B37 (80% Federal) / 4BG7 (20% Local) - CAP Federal Enhancement Max of $828,000.00 - Base Plan: Per-US 22-5.99 to 6.24 (West Main Street); Per-SR 13-27.59 to 27.66 (Columbus Street); 118879~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SLM 13.23 to SLM 13.61 118879~|~1~|~2~|~02/NFA~|~Resurfacing SR 147 from SLM 13.61 to SR 9 121453~|~1~|~1~|~01/S>2~|~Resurfacing. 121453~|~1~|~2~|~02/S>2/NILE~|~Resurfacing, urban paving in Niles. 113465~|~1~|~1~|~01/IMS~|~Replace approach slabs and decks on eight bridges on FAY/MAD IR 71 101651~|~1~|~1~|~01/S>2~|~Culvert Repair: MED-3-21.78 101651~|~1~|~2~|~02/STR~|~Culvert Repair: MED-3-13.67 121705~|~1~|~2~|~02/SAF~|~Traffic Signals - Capital 121705~|~1~|~1~|~01/SAF~|~Traffic Signals - Maintenance 121705~|~1~|~3~|~03/SAE~|~Work includes supplemental signal heads, stop bar detection, advanced radar detection, installation of flashing beacons. Also converting school flashers to solar-powered. 95393~|~1~|~1~|~01/S>2~|~Rehab or replace bridge 95393~|~1~|~2~|~02/S>2~|~Bridge Replacement 98480~|~1~|~2~|~02/STR~|~MED-94-5.44-10.37 Resurfacing (Rural Section) 98480~|~1~|~1~|~01/S<2~|~MED-94-5.31-5.44 Resurfacing (Urbanized Area) 91569~|~1~|~1~|~01/BRO~|~Replace existing box-beam bridge (JEF-150-1254, SFN 4102401) with steel beam or prestressed concrete I-beam bridge. 109611~|~1~|~1~|~01/NHS~|~Emergency column repair and removal of steel deck grating and debris from overhead utility structure COL-30-3564 (SFN 1502352). 113038~|~1~|~3~|~03/STR~|~Plan split for the portion of US 68 outside of the Kenton Urban Area. From the Logan County line to the Kenton Urban Area boundary at 6.97. All funds will be provided by the District. No local funds. 113038~|~1~|~1~|~01/S5K~|~Plan split for portion of US 68 inside the Kenton urbanized area but outside of the City of Kenton. On both sides of US 68 from where US 68 enters the Kenton Urban Area at 6.97 until US 68 enters the City of Kenton on the left side at CR 135 at 7.10, then on the right side until US 68 leaves the City of Kenton on the left side at 7.53, then on both sides of the road until US 68 re-enters the City of Kenton on the left side at 8.78 then on the right side until when the project ends where US 68 enters the City of Kenton on the right side at 8.84. All funds will be provided by the District. No local funds. 113038~|~1~|~2~|~02/S5K/KENT~|~Plan split for portion of US 68 inside the City of Kenton. On the left side of US 68 from where US 68 enters the City of Kenton on the left side at at CR 135 at 7.10 until US 68 leave the City of Kenton on the left side at 7.53. On the left side of US 68 from where US 68 re-enters the City of Kenton on the left side at 8.78 until the project ends where US 68 enters the City of Kenton on the right side at 8.84. The 80% federal funds will be provided by the District, The 20% match will be provided by the City of Kenton. 120881~|~1~|~1~|~01/BRF~|~All work in the project to replace the bridge 83828~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 339 0.00-9.12, NOB 574 0.00-3.68, MRG 339 0.00-0.675 and GUE 574 0.00-0.65. 105886~|~1~|~1~|~01/NHS~|~Plan split for slide repair work 124145~|~1~|~1~|~01/SAF~|~Upgrade existing span wire signal to mast arms with pedestrian signal heads and pushbuttons. Video detection and emergency vehicle preemption to be added to the new signal. Signing and pavement marking upgrades at approaches and curb ramp upgrades as necessary to meet current ADA standards. MPO funding used. 93027~|~1~|~1~|~01/SAF~|~Columbus sponsored, safety funded projectRealign NB & SB LTL within median at Northwest Blvd/Fifth Ave and Northwest Blvd/King Ave 102983~|~1~|~1~|~01/STR~|~Micro on rural routes: MOT SR 725 SLM 0.00 to 3.78 102983~|~1~|~2~|~02/S>2~|~Micro on Lg Urban routes: MOT SR 725 SLM 3.78 to 4.84 114926~|~1~|~1~|~01/NHS~|~All work is in this plan split using district allocations from SACs 4PF7 (80%) and 4PS7 (20%). 122845~|~1~|~1~|~01/S50~|~Resurfacing TCC Federal Surface Transportation 104922~|~1~|~1~|~01/NFA~|~National Express school bus replacement project 109023~|~1~|~1~|~01/STR~|~Landslide repair project on VIN 160 16.64. 100% State (4BE7) funded. 100312~|~1~|~1~|~01/NHS~|~Replacement of HAS-151-21.12 culvert. 100312~|~1~|~2~|~02/STR~|~Replacement of culvert HAS-151-25.34. 119356~|~1~|~1~|~01/NHS~|~Plan split for project to replace the bridge, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. 92900~|~1~|~1~|~01/S<2~|~BRO SR41 1.93 Safety On SR41, begin just South of the intersection of SR41/763, head north and terminate at Slickaway Road. Project Description: It is proposed to improve the alignment of SR41 with a spiral curve, realign the SR763 intersection to improve its width, and remove the intersection of Slickaway Road. Urban SR763 0.00 - 0.21 & SR41 1.88 - 2.07 92900~|~1~|~2~|~02/STR~|~BRO SR41 1.93 Safety On SR41, begin just South of the intersection of SR41/763, head north and terminate at Slickaway Road. Project Description: It is proposed to improve the alignment of SR41 with a spiral curve, realign the SR763 intersection to improve its width, and remove the intersection of Slickaway Road. Rural SR41 2.07 - 2.22 & SR763 0.21 - 0.22 101339~|~1~|~1~|~01/NHS~|~Bridge rehab. 91933~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint. funds for 2year mowing contract. 94019~|~1~|~1~|~01/BRF~|~SFN 2430681 - CR34 (Cook-Yankeetown Road) over Deer Creek. 121886~|~1~|~2~|~02/STR~|~All sidewalk work along Federal Aid routes, including SR 114 and SR 115. 121886~|~1~|~1~|~01/NFA~|~All sidewalk work along local routes and through the village that are not on the federal aid system. 95824~|~1~|~1~|~01/NHS~|~From SLM 9.98 to 13.35 116665~|~1~|~1~|~01/NHS~|~All work outside the Defiance Urban Area. 101849~|~1~|~1~|~01/NHS~|~This project will replace deteriorated bridge decks, paint superstructures, investigate semi-integral abutment conversions and other miscellaneous patching of subsructure units. 110476~|~1~|~1~|~01/SAF~|~Upgrade signal equipment, add pedestrian improvements and curb extensions 105452~|~1~|~1~|~01/STR~|~Major Rehab of pavement on CRA-96 114271~|~1~|~1~|~01/IMS~|~Mowing contract 100688~|~1~|~1~|~01/STR~|~FRA-71-20.75 & 23.46 L/R; MRW-71-17.64 L/R & 18.88 L/R approach slab and back wall repair 98767~|~1~|~2~|~02/ENH~|~Addition of bike lanes on SR-4 (Springfield Pike) in the City of Wyoming. 98767~|~1~|~1~|~01/S<2~|~Improvements to SR-4 (Springfield Pike) in the City of Wyoming including pavement rehabilitation, curb replacement, upgrades to storm sewer system, traffic signal replacement/upgrades, and implementation of "road diet" measures. 98767~|~1~|~3~|~03/NFP~|~Plan split to cover the signalized intersection of SR-4 with West Charlotte, which did not meet warrants and is being paid 100% locally. 99565~|~1~|~2~|~02/NFP~|~For items NOT eligible for Urban Paving. 99565~|~1~|~1~|~01/S>2~|~WOO-65 from 23.57 to 24.53 Urban Pav eligibel items 97716~|~1~|~1~|~01/NFP~|~Adding split do to funding 112484~|~1~|~3~|~03/NHS~|~Full Depth Pavement Repairs using STBG funds 112484~|~1~|~1~|~01/NHS~|~AC overlay - NHS 112484~|~1~|~2~|~02/STR~|~AC overlay - STP Rural 118775~|~1~|~1~|~01/S>2~|~Resurfacing. 118775~|~1~|~2~|~02/STR~|~Resurfacing. 103699~|~1~|~1~|~01/SAF~|~Work eligible for safety funding 118401~|~1~|~1~|~01/NFA~|~Bridge maintenance project. 98031~|~1~|~1~|~01/STR~|~Resurfacing along STP Rural routes 98031~|~1~|~2~|~02/S<2~|~Resurfacing along STP Urban locations 98031~|~1~|~3~|~03/NHS~|~Resurfacing along NHS routes 121998~|~1~|~1~|~01/NFA~|~Full depth roadway reconstruction, curb and gutter replacement, curb ramp and crosswalk improvements and driveway approach, traffic signing, pavement markings, erosion control, landscaping, lighting, maintenance of traffic and other roadway related work. 109382~|~1~|~1~|~01/NFP~|~ODNR slip repair project in Tar Hollow State Park 121730~|~1~|~1~|~01/S>2/TRCE~|~Bridge replacement. 81699~|~1~|~1~|~01/BRO~|~Remove the existing deck on COL-164-1431 (SFN 1504053) and replace with new reinforced concrete deck. Repair substructure units (Piers & abutments) and paint structural steel. 105920~|~1~|~1~|~01/BRF/LCEO~|~CEAO LBR program 4B87 (80% Federal) / LNTP (20% Local [15% CB and 5% LNTP] - See CAP Comments - Replacement of deficient bridge ((4536584) on Twp Rd 180 over Lost Run 121488~|~1~|~2~|~02/STR~|~STP Rural Plan Split 121488~|~1~|~1~|~01/NHS~|~NHS Plan Split. 93694~|~1~|~1~|~01/IMS~|~Design Build Noise Walls 50/50-ODOT/Turnpike 105053~|~1~|~1~|~01/STR~|~Epoxy overlay on PIC-762-10.18 97482~|~1~|~1~|~01/STR~|~Culvert replacements of CFN 670140620 POR-14-25.52, and CFN TBD POR-225-7.19. 97482~|~1~|~2~|~02/STR~|~Replacing culvert CFN 672250130 POR-225-7.42 with a bridge (SFN 6704205) 100365~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 93853~|~1~|~2~|~02/NFA~|~Sanitary Sewer Construction 93853~|~1~|~1~|~01/S<2~|~Widening the roadway, installation of storm sewer, curb, curb ramps, and sidewalk. Sanitary sewer laterals will be upgraded as well. 95816~|~1~|~2~|~02/NFP~|~non eligible urban paving items. 95816~|~1~|~1~|~01/NHS~|~on SR-25 from SLM 10.17 to SLM 11.27 on SR-25D from SLM 0.00 to SLM 0.52 Only eligible urban paving items from face to face of curbs. 104407~|~1~|~1~|~01/SAF~|~This plan split includes all work associated with widening southbound I-275 to provide a two lane exit to SR-32. 104407~|~1~|~2~|~02/NHS~|~This plan split covers all work associated with adding ITS facilities along IR-275 and SR-32. This work consists of adding a Dynamic Message Sign (DMS) on southbound IR-275 approaching SR-32, adding a DMS on westbound SR-32 approaching IR-275, and potentially adding cameras to IR-275 near 5 Mile. 104407~|~1~|~3~|~03/SAF~|~Temp barrier wall. 123685~|~1~|~1~|~01/IMS~|~plan split for interstate locations 92625~|~1~|~1~|~01/S>2~|~Pavement and planing and resurfacing with asphalt on US 36 SLM 16.25 to 17.10 & 17.10 to 17.22 92625~|~1~|~2~|~02/STR~|~Resurfacing of the existing roadway with asphalt concrete on US 36 SLM 17.22 to 17.23 92625~|~1~|~3~|~03/NHS~|~Pavement planning and resurfacing with asphalt on SR 29 SLM 21.17 to 21.75. 93437~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. East Exchange Street from Fountain Street to Main Street, in the City of Akron. 115152~|~1~|~1~|~01/IMS~|~Split for the slope stabilization work along IR-90 EB 104251~|~1~|~1~|~01/STR~|~Chip Seal: CRA-98-9.83-19.20 / RIC-96-6.46-11.99 104251~|~1~|~2~|~02/S<2~|~Chip Seal: RIC-96-5.13-6.46 123821~|~1~|~1~|~01/NHS~|~Sign Replacement 107248~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span. 107248~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span. 107248~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 114812~|~1~|~1~|~01/S<2~|~MAD-SR665-1.17-3.285 114812~|~2~|~2~|~02/STR~|~MAD-SR56-8.462-23.010, MAD-SR142-11.214-13.050, and MAD-SR665-3.285-3.35 96435~|~1~|~1~|~01/S<2~|~Overlay bridge deck with LMC using hydrodemolition, paint the structural steel and replace abutment bearings, patch and seal concrete along with various other work on SFN 5501504. 96435~|~1~|~2~|~02/S<2~|~MIA SR 55 SLM 11.78 to SLM 12.06 - milling, paving and pavement marking within the City of Troy (Urban Paving) between Water St and Stauton Rd. 117117~|~1~|~1~|~01/SAF/GCEO~|~Guernsey County Engineer's Safety Funds to - 4HJ7 (Federal 90%) / LNTP (Local 10% - See CAP Comment - Project to address various safety issues by shoulder widening along various county roadways. 89360~|~1~|~1~|~01/ENH~|~Bikeway 89360~|~1~|~2~|~02/ENH~|~100% Local items. 124903~|~1~|~1~|~01/IMS~|~Installation of 80-foot PTZ cameras throughout District 5. 122279~|~1~|~1~|~01/SAF~|~Plan split for the construction of sidewalk, curb ramps and drive approaches eligible for safety funding. 116097~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in ATB, MAH and TRU Counties. 95603~|~1~|~1~|~01/NHS~|~ADA 32 6.73-19.85 95603~|~1~|~2~|~02/NHS~|~Bridge PM 95603~|~1~|~3~|~03/NHS~|~Guardrail along project limits. 95603~|~1~|~4~|~04/SAF~|~Recessed-Wet Reflective Pavement Markings. 116280~|~1~|~1~|~01/NFP~|~Overlay with and without Repairs 116280~|~1~|~2~|~02/NFP~|~Bridge Maintenance 90220~|~1~|~1~|~01/NFP~|~Project is 100% state funded. 76831~|~1~|~1~|~01/IMS~|~100% UNFU plan split 120500~|~1~|~1~|~01/NFP~|~Resurface Grand Lake Campground Phase 2 110677~|~1~|~1~|~01/STR~|~Resurfacing of TRU SR 88 from 19.11 to 22.76. 110677~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span. 102315~|~1~|~1~|~01/NFA~|~Lost Creek Reserve and Knoop Agricultural Center drives and parking lots. 117511~|~1~|~1~|~01/NFP~|~Created for J&C involvement 112740~|~1~|~1~|~01/MPO~|~Resurfacing of Wooster Rd from 31st St SW to Hudson Run Rd in the City of Barberton. 121240~|~1~|~1~|~01/SAE~|~Plan Split to add signs 123652~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. 109827~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in ATB, MAH and TRU counties. 108960~|~1~|~1~|~01/SAF~|~Widening of Strip Ave between Dressler Rd and Mega St. Strip Ave has been reclassified as a Minor Arterial and is eligible for federal funds. 104180~|~1~|~1~|~01/NFA~|~"01/NFA/OT/ " - GSM project (100% 4SS7) - slide repair on MUS-666. 114853~|~1~|~1~|~01/SAF/IMS~|~Reflective/wet reflective pavement markers for the interstate locations. 114853~|~1~|~2~|~02/SAF/NHS~|~Reflective/wet reflective pavement markers for the NHS locations. 114853~|~1~|~3~|~03/SAF/S>2~|~Reflective/wet reflective pavement markers for the large urban locations. 95101~|~1~|~1~|~01/S>2/Warr~|~Resurfacing of Pine Avenue (CR-69) including curb ramps, guardrail, signing, and pavement markings, in the City of Warren, Trumbull County, Ohio. 117573~|~1~|~1~|~01/NFP~|~Landslide project at the Athens County Garage. Funded 100% State. 96520~|~1~|~1~|~01/NHS~|~Resurfacing of TRU US 422 from 8.09 to 9.26. 96520~|~1~|~2~|~02/NHS~|~Minor Bridge work to SFN 7807015 TRU US 422 8.79 over Mahoning River. 102352~|~1~|~2~|~02/NHS/KENT~|~POR SR 43 from 9.89 to 10.23POR SR 261 from 3.85 to 4.13 Urban paving in the City of Kent. 102352~|~1~|~1~|~01/NHS~|~Double Microsurfacing of POR SR 43 from 7.51 to 8.15 and 8.50 to 9.89.Microsurfacing of POR SR 59 from 5.87 to 6.83 and POR SR 261 from 3.51 to 3.85 and 4.13 to 5.06. 95456~|~1~|~2~|~02/STR~|~"02/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue- SR 800- 00.00-02.48 95456~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue- USR 22-14.67-31.04 94298~|~1~|~1~|~01/IMS~|~Landslide repair project using GSM funds. WAS 77 4.65-4.70. Interstate route funded 90 federal/10 state. 25675~|~1~|~1~|~01/IMS~|~Resurfacing with related bridge work on Lic-IR 70-09.55 to 15.96 25675~|~1~|~2~|~02/STR~|~Resurfacing with related bridge work on Lic-SR 37 108149~|~1~|~1~|~01/S>2~|~Urban Paving Plan split: FRA-3-27.26-27.83 111236~|~1~|~1~|~01/NFP~|~All work to construct the noise wall. 97640~|~1~|~2~|~02/BRO~|~Replace superstructure with minimal approach transitions on SFN 5701627 MOT-35-1516. 97640~|~1~|~1~|~01/IMS~|~Replace deficient bridge deck with minimal approach transitions on SFN5707447 MOT-75-1174 97640~|~1~|~3~|~03/IMS~|~Replace bridge joint seals. 92690~|~1~|~1~|~01/MPO~|~Resurfacing CR 9 8.81 - 10.29 117507~|~1~|~1~|~01/NFA~|~Landslide repair project. HOC 678 2.10-2.13. Work includes dig out and replace with dump rock. 95625~|~1~|~1~|~01/ERD~|~Widen US-36/William St from Potter St to SR-37 to add a center left turn lane. 95625~|~1~|~2~|~02/ENH~|~Replace bikeway bridge at Lake St (US 42) with a longer span to facilitate turning trucks 88463~|~1~|~1~|~01/SAE~|~Fast Dry Pavement Markers throughout the district being paid out of 4MP7 funding. 94684~|~1~|~1~|~01/STR~|~Landslide repair project using GSM funds. ATH 56 6.69-6.78. Rural other federal aid funded 80 federal/20 state. 121276~|~1~|~1~|~01/S5K~|~Culvert replacement project. MEG 124 24.06, CFN 1903016. Funded 80% Federal/20% State. 93231~|~1~|~1~|~01/MPO~|~City of Centerville signage, flagpoles, decorative fencing decorative columns and ladscaping on the Northeast corner of SR 48 and I-675. 107575~|~1~|~1~|~01/IMS~|~2021 Mowing contract. 120773~|~1~|~1~|~01/BRO~|~Repair railing on bridge carrying SR 148 over North Fork Captina Creek. Seal deck with HMWM Resin. 106885~|~1~|~1~|~01/IMS~|~Bridge deck replacement. 105632~|~1~|~1~|~01/STR~|~plan split 104253~|~1~|~1~|~01/BRF~|~All work for the bridge rehabilitation. Federal funds with the match provided by Defiance County. First priority will be to fund the project at a 95% federal rate using credit bridge program funds to increase the federal precentage. After the available credit bridge program funds are used the project will be 80% federal. 104253~|~2~|~2~|~02/BRF~|~All work for the bridge rehabilitation. Federal funds with the match provided by Defiance County. First priority will be to fund the project at a 95% federal rate using credit bridge program funds to increase the federal precentage. After the available credit bridge program funds are used the project will be 80% federal. 84035~|~1~|~1~|~01/ENH~|~"01/ENH/OT" - Construct approximately 2,675 linear feet of five foot sidewalk on the south side of SR 14 (East State Street) from Eastgate Plaza to Wal-Mart Plaza, includes retaining wall; construct approximately 200' of five foot sidewalk along the east side of Cunnigham Road. 80/20 Fed Local funding. 92800~|~1~|~1~|~01/NHS~|~Resurfacing. Includes ramps M, N, BX, BY, BZ, CA in interchange. 92800~|~1~|~2~|~02/NHS~|~Plan Split to cover pavement markings. 120193~|~1~|~1~|~01/ENH~|~CR 56 (Fairground Rd), CR 58 (Bronze Heights), and Main St. and Lewis Street within the Village of Caldwell: sidewalk, drainage, curb ramps, lighting, cross walks, speed detectors, and other safety elements to be installed and constructed throughout the length to improve the pedestrian safety along the newly proposed sport complex. 110469~|~1~|~1~|~01/SAE~|~At the intersection of SR-131 & Wolfpen Pleasant Hill Road, upgrade the existing signal including changing the eastbound left turn movement to protected only. Upgrade the intersection to provide ADA pedestrian crossings. 104846~|~1~|~1~|~01/NFP~|~Construct 3500 ton salt building 118576~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/PV 123864~|~1~|~1~|~01/S50~|~All work included in this split. 122028~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 109843~|~1~|~1~|~01/STR~|~ROS 104 18.68-25.74 109843~|~1~|~2~|~02/STR~|~Bridge PM 109843~|~1~|~3~|~03/SAF~|~Safety funded centerline rumble stripe. 95515~|~1~|~1~|~01/ERD~|~For former CSX RR bridge removal and construction of new Bike/Hike trail 95515~|~1~|~2~|~02/S>2~|~For the removal of former CSX RR bridge and construction of Bike/Hike trail 95515~|~1~|~3~|~03/NFP~|~For CE costs 100% local. 109493~|~1~|~1~|~01/SAF~|~Improve intersection of FRA SR 317 at Rohr Rd. 124627~|~1~|~1~|~01/NHS~|~All work to rehabilitate the twin bridges over Linn Street and three railroads is to be split 50/50 between Major Investments and District Allocation. 102666~|~1~|~1~|~01/BRO~|~Fiscal Year 2022 sealing of concrete bridge decks along IR 70 in Belmont county at various locations. 106208~|~1~|~1~|~01/IMS~|~FY 2022 Block PID for drainage system maintenance/repair. 82907~|~1~|~4~|~04/NHS~|~6700519 SPORSR00014**C POR-SR-14 1.740 1.740 14.0 6700551 SPORSR00014**C POR-SR-14 1.970 1.970 12.0 82907~|~1~|~1~|~01/NHS~|~Resurfacing of SR-14 from SLM 1.76 to SLM 3.11. 82907~|~1~|~3~|~03/MPO~|~Partial and full depth pavement repairs. Balance from the City of Streetsboro. 82907~|~1~|~2~|~02/S>2~|~Resurfacing of SR-14 from SLM 3.11 to SLM 3.67. 117517~|~1~|~1~|~01/SAF~|~Work that is federal aid eligible to enhance safety and installing sidewalks. 108732~|~1~|~1~|~01/NFA~|~Work to replace Ashton Lane bridge over Porter Creek. 108732~|~1~|~2~|~02/NFA~|~Plan split for Columbia Gas of Ohio-Nisource utility work. 115085~|~1~|~1~|~01/NFP~|~SFN 0200506 Lift parapet end sections SFN 0200522 Fix leaning parapet 100% state funds from the District Preservation Program budget. 118832~|~1~|~1~|~01/S5K~|~HUR SR 103 02.04 Lining 96267~|~1~|~1~|~01/BRF~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4506006 LIC SR657 01.94 carrying SR 657 over Clear Fork Creek - - Eligible for Rehabilitation and Replacement: Length = 142; SO/FO (1); SR =75.3; DSR = 4 106664~|~1~|~1~|~01/NFA/ODNR~|~ODNR Program Funds - 4BF7 (100% State) - No CAP - Replacement of deficient culverts in Salt Fork State Park. 104992~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - Plan Split 1 120666~|~1~|~1~|~01/NHS~|~All work included in this split. 102841~|~1~|~1~|~01/STR~|~Smoothseal and AC overlay: PIC-22-0.00 to14.36 and PIC-62-0.00 to 6.78 102841~|~1~|~2~|~02/S<2~|~Overlay and smoothseal on PIC-62-6.78 to 7.64 114362~|~1~|~1~|~01/NFA~|~Resurfacing throughout Guilford Lake State Park 100980~|~1~|~1~|~01/STR~|~DSR# HOL-005 105363~|~1~|~1~|~01/S<2~|~Smooth seal on small urban route: LOG SR 366 SLM 6.03 to 7.24 105363~|~1~|~2~|~02/STR~|~Smooth seal on rural routes: LOG SR 366 SLM 7.24 to 9.78 110006~|~1~|~1~|~01/NHS~|~NHS Plan Split 110006~|~1~|~2~|~02/S>2~|~Urban Area (STP>200000) Plan Split 110006~|~1~|~3~|~03/S<2~|~Urban Area (STP<200000) Plan Split 110006~|~1~|~4~|~04/STR~|~Rural Plan Split 110006~|~1~|~5~|~05/NFA~|~Non-Fed Aid Plan Split 90909~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 103430~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4. 113834~|~1~|~1~|~01/STR~|~Major rehabilitation of SR 149 114823~|~1~|~1~|~01/SAF~|~Signal replacement items 114823~|~2~|~2~|~02/NHS~|~TLCI Work from PID 116996 109449~|~1~|~1~|~01/NHS~|~See linked structures > 20' span. 122349~|~1~|~1~|~01/NHS~|~Repair damage to SR 231 bridge over US 23 100832~|~1~|~1~|~01/S>2~|~Rehab Bridge BUT-122D-0159L (EB SR 122 over University Blvd in Middletown) by replacing the bearings, modifying the abutment seats and replacing the expansion joints. 123717~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with / without repairs on various priority system routes in District 3 87280~|~1~|~1~|~01/NHS~|~ROS US35 4.48 - 15.22 Resurfacing ProjectOn US35, it is proposed to begin resurfacing 0.5 mile (SLM 4.48) west of SR138 and continue east to 15.22 mile marker SLM 15.22).80/20 split01/NHS/PV/State 87280~|~1~|~2~|~02/NHS~|~resurfacing bridges 87280~|~1~|~3~|~03/NHS~|~Deck patching ROS 35 8.69 (7101589)ROS 35 8.70 (7101600) 102529~|~1~|~1~|~01/NFP~|~Landscaping 112891~|~1~|~1~|~01/NFA~|~Bypass existing covered bridge WAS TR 39 0252, SFN 8437718 and build a new structure to replace the existing bridge on new alignment. Funded 95 Federal/5 Local (15% Credit Bridge). 89134~|~1~|~1~|~01/NFA~|~Demolish 5th Ave salt dome and replace with a tarp building 80982~|~1~|~2~|~02/ENH~|~Plan split for all enhancement eligible items of work. 80982~|~1~|~1~|~01/ERD~|~Plan split for all work items eligible for the federal earmark. 108739~|~1~|~1~|~01/NFA~|~Landslide repair 96978~|~1~|~1~|~01/IMS~|~Pavement markings on various routes in ATB, MAH and TRU Counties. 95090~|~1~|~1~|~01/S<2/NEWA~|~"01/S<2/PV/NEWA" - LCATS STP/City of Newark 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP $1.2 Mill 4TA7 - City of Newark resurfacing project on CR125 (21st Street) from Granville Rd to SR 13 96192~|~1~|~1~|~01/STR~|~STP Rural 100% State (SLM 3.07 to 3.23) 96192~|~1~|~2~|~02/S<2~|~STP 100% State due to Delaware Urban Area (SLM 3.23 to 3.37) 119350~|~1~|~1~|~01/STR~|~Superstructure replacement. 84593~|~1~|~3~|~03/STR~|~Replacement of structure at POR SR 225 7.65, sfn# 6703984. 84593~|~1~|~2~|~02/STR~|~Plan Split for POR SR 14 from 18.07 to 25.34, POR SR 183 for 03.00 to 7.61. 84593~|~1~|~1~|~01/STR~|~Plan Split for SFN 6700853 POR SR 14 19.20 over Branch of Silver Creek, SFN 6700942 POR SR 14 20.03 over Silver Creek, SFN 6700977 POR SR 14 22.09 over Tributary of Mahoning River, SFN 6703739 POR SR 183 05.12 over Branch of Mahoning River. 100741~|~1~|~1~|~01/MPO~|~Resurfacing South Avenue from Midlothian Blvd to Williamson Ave. Mill and fill 2.25" and includes full and partial depth repairs, replacing existing curb ramps with ADA compliant curb ramps, new pavement markings and signs. 107652~|~1~|~1~|~01/STR~|~Resurfacing on US 68 from the north boundary of the Kenton Urban Area at TR 114 at SLM 11.06 in Hardin County to Washington Street in the Village of Dunkirk at SLM 19.22, from the north corporation limits of the Village of Dunkirk to the Hancock County Line at SLM 21.80, from just north of US 30 at SLM 0.77 to the Village of Arlington at SLM 4.70, and from the north corporation limits of the Village of Arlington at SLM 5.59 to the south boundary of the Findlay Urban Area at the SR 15 interchange ramps at 11.67 in Hancock County. District preservation funds (4PF7 - 80% and 4PS7 - 20%). 107652~|~1~|~2~|~02/S<2~|~Resurfacing on US 68 from the beginning of the project at the north corporation limits of the City of Kenton at SLM 10.61 in Hardin County to the north boundary of the Kenton Urban Area at TR 114 at SLM 11.06 and from the south boundary of the Findlay Urban Area at the SR 15 interchange ramps at 11.67 to the end of the project at SR 15 at SLM 12.00. District preservation program funds (4PF7 - 80% and 4PS7 - 20%). No local funds. 98622~|~1~|~1~|~01/NFP~|~100% State funding for turnpike mitigation eligible work items. 122752~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 101180~|~1~|~1~|~01/NFA~|~Smooth seal on Non-Federal aid routes: AUG SR 198 SLM 8.19 to 11.01 114851~|~1~|~1~|~01/STR~|~STP Rural Plan Split on MRW-314 94287~|~1~|~1~|~01/S>2~|~Resurfacing of County Route 171 (Cleveland Road) from Highland Avenue (SLM 0.26) to North Corporation limit (SLM 0.96) in the City of Ravenna, Portage County, Ohio. 116128~|~1~|~1~|~01/IMS~|~Repair 200' retaining wall near southbound STA IR 77 2.57. 102895~|~1~|~1~|~01/SAE~|~Paint pavement markings on Huron County roads. 102895~|~2~|~2~|~02/SAE~|~Thermoplastic pavement marking on various Huron County routes 107391~|~1~|~1~|~01/NFP~|~Mowing on various routes in Franklin County 118761~|~1~|~1~|~01/STR~|~added plan split. 111393~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 307 0.72, SFN 5634768. Work includes abutments and approach work. Not on the federal aid system funded 100% Federal. 101402~|~1~|~2~|~02/IMS~|~Bridge Rehab work. See linked structures. 101402~|~1~|~4~|~04/NHS~|~Resurfacing of SUM State Route 8 from SLM 0.00 to SLM 0.63, in the City of Akron. 101402~|~1~|~3~|~03/IMS~|~Pavement replacement. SUM IR76 from SLM 11.01 to SLM 12.03 and SUM IR77 from SLM 11.54 to SLM 11.86, in the City of Akron. 101402~|~1~|~1~|~01/IMS~|~Constructing two new flyover bridges in the central interchange. 101402~|~1~|~5~|~05/IMS~|~Removal of Lafollette structure, replaced with pedestrian structure. 101964~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control - 2 lane highways. 107842~|~1~|~1~|~01/STR~|~all of the routes in the Rural area 107842~|~1~|~2~|~02/S>2~|~MAD-40 in Columbus Urban Area 124653~|~1~|~1~|~01/SAF~|~Construction of riverside trail 119903~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-C 92391~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of 1) 2301814 FAI SR158 13.34 Intersect: Pawpaw Creek; Not BR Eligible for Replacement: Length=12 SD/FO(1) SR=71.5 DSR=" "; 92391~|~2~|~2~|~02/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of 1) 2301830 FAI SR158 15.27 Intersect: Trib Of Reservoir Feeder; Not BR Eligible for Replacement: Length=20 SD/FO(1) SR=70.2 DSR="N " 94757~|~1~|~2~|~02/SAF~|~Rebuild 2 signals with mast arms, video and dilemma zone detection. Work also includes upgrading pedestrian facilities at intersections. To be funded by the City of Piqua includes SLM 11.56 (Scot/Centre) and SLM 11.94 (Looney Road). 94757~|~1~|~1~|~01/SAF~|~Rebuild the two signalized ramp intersections with mast arms along with video and advanced dilemma zone detection. US 36 & IR 75 southbound ramp to the US 36 & IR 75 northbound ramp. MIA 36 SLM 11.69 to 11.83. 108379~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 555 24.60-24.64. MRG_NF_0005. Not on the federal aid system funded 100% state ER funds. 116099~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in ATB, MAH and TRU counties. 95926~|~1~|~1~|~01/IMS~|~Overlay bridge deck with LMC using hydrodemolition, patch areas of structure, refurbish bearings and seal all concrete surfaces with epoxy urethane. Bridge # CLA-675-0079, SFN 1206508. 87157~|~1~|~1~|~01/STR~|~Bridge and roadway work associated with Bridge GRE-68-0084 (SFN 2901110). 87157~|~1~|~2~|~02/NHS~|~Bridge and roadway work associated with bridge GRE-68-0854 (SFN 2901323) 98791~|~1~|~1~|~01/NFA~|~Constructing Tech Drive, 1,287 foot roadway, 26' wide into what will become the main access in to the future Logan County Industrial Park as well as improvements to CR 32 where Tech Drive will originate. 95856~|~1~|~1~|~01/STR~|~Plan split to replace culvert 89094~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using and asphalt overlay treatment. Work includes pavement marking and berm conditioning. WWW-MPO funded. WAS CR 4 2.30-2.36, 3.28-4.65. Includes CR 79 0.00-0.27. Rural other federal aid funded 80% Federal/20% Local. 89094~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using and asphalt overlay treatment. Work includes pavement marking and berm conditioning. WWW-MPO funded. WAS CR 4 1.76-2.30, 2.36-3.28. Urban other federal aid funded 80% Federal/20% Local. 93261~|~1~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3001350 GUE IR70 9.94 Intersect: Wb I-70 Over Nb I-77; Not BR Eligible for Rehabilitation: Length=159 SD/FO(0) SR=88. DSR=4 93261~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3001385 GUE IR70 9.94 Intersect: Eb I-70 Over Nb I-77; BR Eligible for Rehabilitation: Length=99 SD/FO(2) SR=33.9 DSR=6 112759~|~1~|~1~|~01/NHS~|~Under water Bridge Inspection 93149~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6006035 MUS SR555 4.93 Intersect: Over Turkey Run; Not BR Eligible for Rehabilitation: Length=54 SD/FO(0) SR=82.7 DSR=6 93786~|~1~|~1~|~01/STR~|~Replace SFN 3600874Located 1.86 miles west of SR753 on SR28 It is proposed to replace the dificient structure. 80/20 Split01/STP/BR/State 93298~|~1~|~1~|~01/MPO/LAK~|~Plan split for resurfacing federally eligible roadway with STBG funding 121981~|~1~|~1~|~01/SAF~|~Construct shared use path and improve pedestrian crossings along New Germany Trebein Rd (CR-51) and Trebein Rd (CR-84) in Greene County to improve connectivity to Hobson Freedom Park. 123335~|~1~|~1~|~01/STR~|~Resurfacing. 123335~|~1~|~2~|~02/STR~|~Minor bridge work 82698~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for STP funds 82698~|~1~|~2~|~02/NFP~|~Work items that are 100% local participation as well as cost above the federal funding available. 98205~|~1~|~2~|~02/NHS~|~"02/IMS/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS routes in Coshocton, Muskingum, Guernsey Counties in FY2019 98205~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on Interstate routes in Coshocton, Muskingum, Guernsey Counties in FY 2019 98205~|~1~|~3~|~03/S<2~|~"03/S<2/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes in Coshocton, Muskingum, Guernsey Counties in FY2019 98205~|~1~|~4~|~04/STR~|~"04/STR/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routes in Coshocton, Muskingum, Guernsey Counties in FY2019 98205~|~1~|~5~|~05/NFA~|~"05/NFA/OT/ " - District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NNOFAS-Rural routes in Coshocton, Muskingum, Guernsey Counties in FY2019 104166~|~1~|~1~|~01/NHS~|~Work on NHS routes. DEL-23, FRA-23, FRA-33, FRA-16, FRA-161, FRA-317, MAR-23 104166~|~1~|~2~|~02/STR~|~Work on STP Rural routes. MAR-98, PIC-180 89127~|~1~|~1~|~01/BRF~|~Rehabilitate existing bridge; remove superstructure, utilize parts of the existing abutments. Improve sections of Schaadt Road adjacent to the bridge and improve the intersection at the East End of the bridge. Replace, repair and widen all appurtenances associated with the referenced intersection. SFN 5450535 MER-TR-190 0.000 to 2.000 121349~|~1~|~1~|~01/S>2~|~All work related to the rehab of bridge CLE-132-0173 102228~|~1~|~1~|~01/NFA~|~The City is constructing a dedicated right - hand turn lane on southbound Tiedeman Road at the I-480 and to replace the concrete pavement and approach slabs north and south of the Tiedeman overpass. 116153~|~1~|~1~|~01/STR~|~Work on SR 31 outside the Kenton Urban Area. Funding from the District Capital allocation at 80% federal (4PF7) and 20% state (4PS7). 116153~|~1~|~2~|~02/S5K~|~Resurfacing inside the Kenton Urban Area both inside and outside of the City of Kenton. District Preservation Program funds. No local funds. On both sides of the road from 8.742 to 9.956 and on the right side of the road from 9.956 to 10.155. 103533~|~1~|~2~|~02/S>2/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for OFAH-Urban (Columbus) - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing on specified routes. 103533~|~1~|~3~|~03/STR/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for OFAH-Rural Routes - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing on specified routes 103533~|~1~|~4~|~04/S<2/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for OFAH-Urban Routes - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing on specified routes 103533~|~1~|~1~|~01/NFA/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for minor collector - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Minor Collector resurfacing on specified routes - (Contingent upon Congress continuing to include Minor Collectors in the Transportation Bills. 119919~|~1~|~1~|~01/NHS~|~PROTECT bridge carrying SR 7 over Croxton's Run from scour. 105220~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate Route bridge. 77889~|~1~|~1~|~01/IMS~|~Bridge - reconstruction on or over HAM-75 77889~|~1~|~2~|~02/NHS~|~Bridge - replacement of the overhead RR bridge over HAM-562 77889~|~1~|~3~|~03/BRF~|~Bridge - replacement of the RR bridge over Prosser Ave. New bridge SFN will be 3160007 77889~|~1~|~4~|~04/NFA~|~Plan split for railroad track bed reconstruction to be performed by the roadway contractor. 117837~|~1~|~1~|~01/IMS~|~Split for interstate bridge work (non-federal) 117837~|~1~|~2~|~02/NHS~|~Split for non-federal bridge work on the NHS 109749~|~1~|~1~|~01/STR~|~AC overlay without repairs 109749~|~1~|~2~|~02/S<2~|~AC overlay without repairs 82086~|~1~|~1~|~01/BRF~|~Structure removal and replaced with a single span, steel girder over Crandall Run in the City of Youngstown, Ohio. 82086~|~1~|~2~|~02/BRF~|~Work associated with Dominion East Ohio gas line. 112629~|~1~|~1~|~01/MPO/LORD~|~Resurfacing, in the Village of Lordstown. 106322~|~1~|~1~|~01/NFA~|~ADA Facility Assmts 96461~|~1~|~1~|~01/NFA~|~Replace HVAC at Mercer County Garage 109773~|~1~|~1~|~01/NHS~|~Fine graded polymer asphalt concrete overlay 109773~|~1~|~2~|~02/SAF~|~Install cable barrier on US 68 from US 40 to SR 334 120671~|~1~|~1~|~01/NHS~|~Plan Split to program project. Update at scope complete. 109019~|~1~|~1~|~01/ENH~|~All work in this project is in this split. 95% federal funds with Toll Revenue Credit from the Transportation Alternatives Program (TAP). The local match and funds needed over the TAP cap to be provided by the Village of Oakwood. 111503~|~1~|~1~|~01/MPO~|~Transfer of existing fiberoptic interconnect cable to new steel Duke poles and transfer of power service. Kemper Road from Tri-County Parkway to Century Boulevard. 92963~|~1~|~4~|~04/S<2/ZANE~|~"04/S<2/PV/ZANE" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing on 1). Mus-SR 555-(11.18-11.34); 92963~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing of 1) Mus-SR 555-04.02 to 08.18; 2) Per-SR 555-03.77 to 04.33; 3) Mrg-SR 555-23.06 to 23.75; 4) Mus-CR 06-12.436 to 12.85 92963~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1). Mus-CR 6-12.85 to 15.43 92963~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Mus-SR 555-00.00 to 04.02; 2)Per-SR 555-00.74 to 03.77; 3)Mrg-SR 555-26.72-27.16 124332~|~1~|~1~|~01/SAE~|~Roundabout 124199~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 91776~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 26 18.45-29.36. Rural route funded 80 federal/20 state. 95759~|~1~|~2~|~02/S>2~|~From 0.00 to 3.03 95759~|~1~|~1~|~01/STR~|~from SLM 3.03 to 8.35 95759~|~1~|~3~|~03/BRO~|~OTT-579-1.85 109394~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 110678~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 110678~|~1~|~3~|~03/STR~|~Minor bridge work > 10' to 20' span. 110678~|~1~|~1~|~01/STR~|~Resurfacing 97222~|~1~|~1~|~01/ENH~|~New bake path 111159~|~1~|~1~|~01/NHS~|~Replace temporary structure HAS-151-0767 (SFN 3402135) with a new structure. 98316~|~1~|~1~|~01/IMS~|~Districtwide fast dry pavement marking contract 122338~|~1~|~1~|~01/MPO~|~Plan split for MPO funded resurfacing work. 122338~|~1~|~2~|~02/SAF~|~Plan split for ODOT Special Solicitation using safety funds for work on roundabouts and bike lanes. 99203~|~1~|~1~|~01/IMS~|~SFN 1204351 - CLA-70-12.08 (R) - Bridge replacement-mainline profile adjustment-MSE walls. 99203~|~1~|~2~|~02/BRO~|~BR eligible - SFN 1204327-CLA-70-12.08 (L)-bridge replacement-mainline profile adjustment-MSE walls. 99203~|~1~|~3~|~03/IMS~|~Resurface IR 70 with Item 446 asphalt concrete on CLA IR 70 10.55 to 13.98 110577~|~1~|~1~|~01/STR~|~Culvert repair throughout the district. 102585~|~1~|~1~|~01/NHS~|~All work on US 224 in Hancock County from CR140 at 10.75 to the WCL of Findlay at 11.54; from just west of TR 212 at 17.42 to TR 242 at 18.43; and it Putnam County from the bridge just west of Glandorf at 19.26 to the WCL of Ottawa at 19.89. 102585~|~1~|~2~|~02/S<2~|~All work on US 224 in Hancock county from SLM 18.43 to the Findlay Urban Area boundary at CR 248 SLM 19.94 and in Putnam County from 18.33 to 19.26. 102585~|~1~|~3~|~03/STR~|~On US 224 in Hancock County from 7.26 to 10.75 and from the Findlay Urban Area boundary at CR 248 SLM 19.94 to 26.04; and in Putnam County from 12.13 to 18.33. 107144~|~1~|~1~|~01/NFA~|~Industrial Parkway 500 foot extension 95865~|~1~|~1~|~01/NFP~|~@ SLM 2.84 119860~|~1~|~1~|~01/ENH~|~Monroe County SR 78 Multi-Use Path Phase 1 99666~|~1~|~1~|~01/NHS~|~Resurfacing work funded with 80% federal and 20% state dollars 82407~|~1~|~1~|~01/BRF~|~Replacement of Bridge SFN 7841914 over Big Yankee Creek 92355~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 105903~|~1~|~1~|~01/S>2~|~Plan split for urban paving work 93483~|~1~|~1~|~01/IMS~|~Type 1 Emergency - Work at culvert location prior to pipe liner 106650~|~1~|~1~|~01/NFA~|~Replacement of the Baker Road Bridge in Athens at mile marker 8.30. 115276~|~1~|~1~|~01/NFP~|~ODNR project for a landslide repair on Road 10 at the HOC Tar Hollow State Park. 101258~|~1~|~1~|~01/STR~|~Split for paving work 102461~|~1~|~1~|~01/STR~|~Minor Rehab of pavement on SR 93 in TUS county 119855~|~1~|~1~|~01/S>2~|~Roundabout improvements along SR161 from Busch Blvd to Ambleside Dr 98305~|~1~|~1~|~01/STR~|~Mine subsidence remediation project. VIN 56 7.87. Type A Emergency project funded 100% state. 117275~|~1~|~1~|~01/IMS~|~Pavement work on BUT 75 location. 117275~|~1~|~2~|~02/NHS~|~Pavement work on NHS locations. 117275~|~1~|~3~|~03/NHS~|~Plan Split for the BUT-4 location the resurfacing south of the RR bridge 109027~|~1~|~1~|~01/STR~|~ASD SR 0060 27.40 and ASD US 0042 15.05 Culvert Replacements. 88789~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 95190~|~1~|~2~|~02/S<2~|~For CR D from SLM 10.82 (CR-16) to SLM 13.81 (CR-13) 95190~|~1~|~1~|~01/STR~|~CEAO funded CR-D and CR-3 107207~|~1~|~1~|~01/SAF~|~Construction of an EB right turn lane on HOC 33 0.40. Safety project funded 90 federal/10 state. 123092~|~1~|~1~|~01/BRO~|~Plan split to program project, update during scoping process. 99939~|~1~|~1~|~01/S<2~|~SCI US 23 1.63 (Kinney Lane) 99939~|~1~|~2~|~02/SAF~|~SCI US 23 1.63 (Kinney Lane) 99998~|~1~|~2~|~02/NHS~|~Split for culvert work on SR-176 99998~|~1~|~1~|~01/IMS~|~Split for culvert work on the interstate system 111603~|~1~|~1~|~01/NFP~|~Plan split 1 for bridge work 104776~|~1~|~1~|~01/BRO/FCEO~|~"01/BRO/BR/FCEO" - Fairfield County Engineer - replacement of deficient bridge on CR63 - Approved CEAO FY22 - Fed Max $1,368,480 84646~|~1~|~1~|~01/STR~|~2 Lane Chip & Seal ProjectADA-SR-136 20.360 to 25.140 O C 000 ADA-SR-247 18.170 to 23.980 O C 000 HIG-SR-138 0.000 to 7.030 O C 000 LAW-SR-141 16.370 to 22.940 O C 000 84646~|~1~|~2~|~02/STR~|~Deck Sealing on ADA SR 136 21.38 SFN 0103527LAW SR 141 19.64 SFN 4402758 124436~|~1~|~1~|~01/SAF~|~Construct sidewalks and pedestrian controls on SR 521 in Kilbourne 91314~|~1~|~1~|~01/IMS~|~Paving southbound CD lanes from 41.40 to 43.18 105278~|~1~|~2~|~02/STR~|~Asphalt resurfacing work and pavement repairs in the Village of Richmond. 105278~|~1~|~1~|~01/STR~|~Resurfacing SR 43 from the Village of Richmond to the Village of Amsterdam. 105278~|~1~|~3~|~03/SAF~|~Centerline rumble stripe work 124329~|~1~|~1~|~01/NFA~|~Repair/replace the wash bay walls and ceiling at the Athens FSMF 116877~|~1~|~1~|~01/S>2~|~Resurfacing 118121~|~1~|~1~|~01/NHS~|~added plan split. 112468~|~1~|~1~|~01/NFP~|~The Village is reconstructing approximately 1,000 feet of West Wall Street from North Walnut Street west to North Dix Street. 97111~|~1~|~1~|~01/BRF~|~The replacement of SFN6532195 and SFN6530486 97896~|~1~|~1~|~01/S<2~|~CR 228 (OM 038) - Roadway widening project consists of revising the existing roadway from 2 lanes to 3 lanes (39' side). 75436~|~1~|~1~|~01/NHS~|~Realigning State Route 59. 75436~|~1~|~2~|~02/NHS/Akrn~|~Ineligible items. 114403~|~1~|~1~|~01/IMS~|~Plan split to program project. Update at the time of scoping. 105585~|~1~|~1~|~01/STR~|~Rural plan split: MAD-40-13.92-14.21 MRW-61-3.27-13.18 UNI-161-6.13-12.40 UNI-347-0.97-4.22 100372~|~1~|~1~|~01/STR~|~Various locations 121967~|~1~|~1~|~01/SAF~|~Plan split for all roadway items associated with the construction of the roundabout 121967~|~1~|~2~|~02/BRO~|~Plan split for bridge work associated with the WOO-199-2665 bridge replacement 115009~|~1~|~1~|~01/MPO/BEAV~|~Decorative hardscape enhancements to Colonel Glenn Highway from National Road to Zink Road. Replacement of deteriorating sections of sidewalk. 84699~|~1~|~1~|~01/SAE~|~"01/SAE/PV/ " Safety Funding 4BC7 (100% State) - $1,972,592.27 CAP - Ramp reconfiguaration to reduce the number of accidents due to the short radius of the existing ramp configuration. 84699~|~1~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Backwall rehabilitation on 1) 4503694 LIC IR70 15.72 Intersect: Buckeye Lake Overflow; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=61.9 DSR=7; 2) 4503724 LIC IR70 15.72 Intersect: Buckeye Lake Overflow; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=62.9 DSR=7; 84699~|~1~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on: 1) 4504712 LIC SR79 4.19 Intersect: Over Buckeye Lake Overflow; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=60.4 DSR=6: 2) 4504771 LIC SR79 4.53 Intersect: NE Ramp Over Overflow; BR Eligible for Rehabilitation: Length=99 SD/FO(1) SR=59.6 DSR=5: 103846~|~1~|~1~|~01/STR~|~ER slip repair on PIK CR 50 3.32 (PIK-005) 103026~|~1~|~1~|~01/IMS~|~Installing tower lighting at the I-90/SR 534 interchange. 112855~|~1~|~1~|~01/NHS~|~D09 Smoothseal FY27 117461~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 83 1.40, SFN 0549452 and ATH TR 461 0.01, SFN 0547867. 83643~|~1~|~1~|~01/S>2~|~80/20 fund split using federal Urban STP funds for SLM 19.14 to SLM 21.94. East of 21.94 is rural. 83643~|~1~|~2~|~02/STR~|~80/20 fund split using federal Rural STP funds for SLM 21.94 to SLM 23.94. West of 21.94 is urban. 110810~|~1~|~1~|~01/BRO~|~Split for bridge deck replacement work 86919~|~1~|~1~|~01/BRO~|~SFN 7434464, SEN-CR38-9.32 over Sandusky River. 114848~|~1~|~1~|~01/STR~|~Rural portion of SR 665 104252~|~1~|~1~|~01/NFP~|~All work to replace the bridge. State Exchange Funding SAC 4C87 with the 5% match provided by Allen County. 119905~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-D 93453~|~1~|~1~|~01/BRO~|~Bridge deck sealer treatment on SFN 7500602 SHE-IR-75 6.660 230.0 93453~|~1~|~7~|~07/NFA~|~Bridge deck sealer treatments on: SFN 4604024 LOG-SR-638 1.74 SFN 4602447 LOG-SR-273 7.37 93453~|~1~|~2~|~02/IMS~|~Bridge deck sealer treatment on SFN 7502109 SHEIR00075**C : 9.960 SFN 7502133 SHEIR00075**C : 9.960 SFN 7502524 SHEIR00075**C : 17.07 SFN 0602345 AUGCR00190**C : 0.29 SFN 7502850 SHESR00119**C : 9.37 SFN 7502222 SHEIR00075**C : 11.49 SFN 7502257 SHEIR00075**C : 11.49 SFN 7502613 SHECR00029**C : 9.15 SFN 7501684 SHECR00008**C : 4.91 SFN 1203495 CLA-070-0016 : SFN 1205102 CLAIR00070**C : SFN 7502559 SHE-75-1707R. 93453~|~1~|~6~|~06/S<2~|~Bridge deck sealer treatments on SFN 1902318 DARUS00036**C : 12.28 SFN 1902342 DARUS00036**C : 12.57 SFN 1902288 DARUS00036**C : 12.28 SFN 1902377 DARUS00036**C : 12.57 SFN 5400325 MERSR00029**C : 14.29 SFN 5400341 MERSR00029**C : 14.29 93453~|~1~|~5~|~05/STR~|~Bridge deck sealer treatments SFN 1900463 DARSR00047**C 6.49 SFN 7501390 SHESR00066**C 13.03 SFN 7500424 SHESR00047**C 3.97 SFN 5400759 MERSR00049**C 7.84 SFN 7503423 SHESR00705**C 3.07 SFN 1903055 DARSR00502**C 3.32 SFN 7500777 SHESR00047**C : 21.36 SFN 4602560 LOGSR00274**C : 3.19 SFN 1904124 DARSR00705**C : 15.99 SFN 7503105 SHESR00362**C : 1.52 SFN 7501137 SHESR00066**C : 4.84 SFN 7500556 SHESR00047**C : 11.49 SFN 1904213 DARSR00721**C : 4.40 SFN 4601866 LOGSR00117**C : 3.64 SFN 5402689 MERUS00127**C : 18.95 SFN 1902261 DARUS00127**C : 1.37 SFN 1902679 DARUS00127**C : 22.02 93453~|~1~|~3~|~03/NHS~|~Bridge deck sealer treatments SFN 4601440 LOGUS00068**C : 0.400 SFN 4600576 LOGUS00033**C : 14.68 SFN 4603370 LOGSR00347**C : 0.17 SFN 4602935 LOGSR00292**C : 0.30 SFN 4600606 LOGUS00033**C : 14.68 SFN 4601890 LOGSR00117**C : 6.71 SFN 5700515 MOT-004-1731 SFN 5704103 MOT-049-0353 : SFN 4601564 LOG-68-0979 93453~|~1~|~4~|~04/BRO~|~Bridge deck sealer treatmentsSFN 1902520 SHE-SR-47 14.420SFN 7500637 SHE-SR-47 14.420 91899~|~1~|~1~|~01/S<2~|~Federal Urban STP funds from the Small Cities Program. The 20% local match provided by the Village of Ada. 121661~|~1~|~1~|~01/BRO~|~Replace bridge 86870~|~1~|~1~|~01/IMS~|~Replace superstructure on two bridges (BEL-70-2663A, SFN 0703001 and BEL-70-2663D, SFN 0703060) and replace deck on another brideg (BEL-70-2663, SFN 0703036). Substructure repairs will be performed on the first two bridges as needed. 86870~|~1~|~2~|~02/IMS~|~Added funding event for on-going services to be provided by Consulatnt during Construction. 105052~|~1~|~1~|~01/NFA~|~Repair of MAR-100-1.45 (not on the Federal Aid System) 94008~|~1~|~1~|~01/NFP~|~Plan split for all work 10379~|~1~|~1~|~01/STR~|~Brdg replacement. 4401743 LAW SR93 15.39 Intersect: Pine Creek0.25 MI. S OF TR.199. 80 Fed/20 State. 01/STR/BR/State 105663~|~1~|~1~|~01/STR~|~STP Rural. District Preservation Programs funds. 109706~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4CP7 (100% State) - No CAP - Ding-N-Dent Guardrail repair District Wide 113645~|~1~|~1~|~01/SAF/ZANE~|~City of Zanesville Safety Program - 4HJ7 (90% Federal) / 4BC7 (10 % State), 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Safety improvements along Pine Street at three signalized intersections: West Main Street, Pershing Road, and Eppley Avenue. 92996~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Cos-SR 715-00.00 to 02.54; 2) Cos-SR 206-05.98 to 06.63; 3) Cos-SR 715-03.19 to 08.14; 4) Kno-SR 715-00.00 to 04.26; 91451~|~1~|~1~|~01/NHS~|~Pavement project using concrete pavement repair (CPR) treatment. GAL 7 5.21-10.21. Federal/State 80/20% funded. 110528~|~1~|~2~|~02/NHS~|~Pavement rehab Plan split for Rural pavement 110528~|~1~|~1~|~01/NHS~|~Pavement Rehab plan split for Urban area 89286~|~1~|~1~|~01/S<2~|~Widening and construction of turn lanes on Farson St in City of Belpre. PE funding by City, Construction Funding by ARC Local Access Roads. Funding priority: 01 80/20 Federal/Local 4D37/4BG6, 02 100% Local 4BG6, 03 100% Local 4BG7. 103890~|~1~|~1~|~01/NFA~|~The TID is constructing the Main Street Emergency Steamboat and Shoreline Protection Project including, but not limited to , roadwork improvements by constructing a longitudinal dikes and rock buttress at the most severe locations along Main Street. 92336~|~1~|~1~|~01/NFP~|~Replace foot bridge and drainage structures under SR VIN 349 0.280. ODNR to let project. ISTV/agreement will be used to transfer ODOT funds to ODNR. Funded 100% state. 124910~|~1~|~1~|~01/STR~|~Culvert replacement. 114387~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/PV/ - 80% Federal, 20% State 113438~|~1~|~1~|~01/NHS~|~Minor bridge rehabilitation on MEG 33 8.66 R, SFN 5300819. Type C Emergency. 102544~|~1~|~1~|~01/S>2~|~plan split for work in the large urban sections of BUT-126 & BUT-128 102544~|~1~|~2~|~02/STR~|~plan split for pavt work on the rural sections on BUT-128 & HAM-128 102544~|~1~|~4~|~04/S>2~|~Plan Split for the 80/20 items on the sections of BUT-128 fully inside the City of Hamilton. BUT-128: 7.5-7.57 + 7.74-8.33 + 8.49-8.54 102544~|~1~|~5~|~05/S>2/HAML~|~Plan Split for the 100% items on the sections of BUT-128 fully inside the City of Hamilton. BUT-128: 7.5-7.57 + 7.74-8.33 + 8.49-8.54 102544~|~2~|~3~|~03/S>2~|~Part 2 only: Plan Split for slide correction near Pryamid Hill park entrance 95557~|~1~|~1~|~01/MPO~|~80/20 federal/local split using MPO STP funds for the bridge repair of SFN 1870025 (Prospect Avenue), SFN 1869442 (Huron Road), SFN 1868411 (West 6th Street), SFN 1868403 (West 3rd Street) and SFN 1867245 (West 2nd Street). 95557~|~1~|~2~|~02/MPO~|~100% local participation on work items non-eligible for federal funding. 83934~|~1~|~1~|~01/STR~|~Rural 83934~|~1~|~2~|~02/S50~|~STP 50,000 - 200,000 105861~|~1~|~1~|~01/IMS~|~Replacing structures >20' span. 105861~|~1~|~3~|~03/NHS~|~Culvert replacements and repair. 105861~|~1~|~2~|~02/IMS~|~Replacement of sign support structures and extrusheets at the IR77 and SR21 interchange. 98221~|~1~|~1~|~01/NFP~|~Crack sealing on routes throughout District 5. 121965~|~1~|~1~|~01/NFA~|~Stabilize & Resurface Existing Roadway CR 48 mm 0.00 to 1.86 104510~|~1~|~1~|~01/BRO~|~work eligible for CEAO LBR funding. 120337~|~1~|~1~|~01/STR~|~Culvert replacement project. VIN 278 2.79 (CFN 1811036). Funded 80% Federal/20% State. 94054~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities - 4MA7-005 (100% State) - No CAP - Construction of a new Salt Dome at the District 5/Licking County Headquarters complex 117898~|~1~|~1~|~01/NFP~|~Split for signal work at the intersection of IR90 and SR 528 117898~|~1~|~2~|~02/NFP~|~SPR funded work - wrong way bump pad 118153~|~1~|~1~|~01/STR~|~Slide repair and culvert replacement. 101699~|~1~|~1~|~01/SAF~|~Intastallation of sign on the State Route 8 bridge in the City of Cuyahoga Falls, Summit County, Ohio. 114146~|~1~|~1~|~01/NFP~|~Crack sealing on various routes in D9. 88936~|~1~|~3~|~03/S>2~|~Resurfacing STA SR 687 from 5.53 to 5.70 (Ramp I). 88936~|~1~|~2~|~02/NHS~|~Resurfacing STA US 62 from 22.19 to 22.60 (includes Ramp H). 88936~|~1~|~1~|~01/IMS~|~Resurfacing STA IR 77 from 11.84 to 12.80. 88936~|~1~|~4~|~04/IMS~|~Minor bridge work >20' span. 96713~|~1~|~1~|~01/STR~|~SFN 7200811, SAN-6-23.58 98043~|~1~|~5~|~05/STR~|~STP Rural Bridges FRA-665-2.14 SFN 2516810 FRA-665-2.53 SFN 2516829 FRA-665-3.26 SFN 2516888 FRA-665-5.28 SFN 2516934 98043~|~1~|~4~|~04/S>2~|~Urban paving (Grove City) SLM 10.97 to 10.98 SLM 11.61 to 11.89 SLM 12.24 to 12.55 SLM 12.59 to 13.48 98043~|~1~|~6~|~06/S>2~|~STP >2 Bridges FRA-665-10.08 SFN 2517027 FRA-665-11.93 SFN 2517043 FRA-665-14.00 SFN 2517116 FRA-665-12.62 SFN 2517078 98043~|~1~|~3~|~03/S>2~|~Pavement within Columbus UA but outside Grove City SLM 7.3 to 8.38 SLM 9.89 to 10.97 SLM 10.98 to 11.61 SLM 11.89 to 12.24 SLM 12.55 to 12.59 SLM 13.48 to 14.52 98043~|~1~|~1~|~01/STR~|~STP Rural pavement SLM 0.00 to 3.31 and 5.18 to 7.39 98043~|~1~|~2~|~02/S<2~|~STP <2 pavement within the Darbydale UA 106652~|~1~|~1~|~01/NFA~|~Replace bridge over Bokes Creek 95988~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (1100% State) - No CAP -Resurfacing on portions of Per-SR 37-(0.00-8.59) 108084~|~1~|~1~|~01/MPO/CUYA~|~Widen Portage Trail Extension West to construct a two-way left-turn lane from Albertson Parkway to State Road in Cuyahoga Falls. Includes 10' and 8' wide multi use trail/sidewalks and drainage system. 107973~|~1~|~1~|~01/NFP~|~FY 2019 Fence repair/replacement project. 113314~|~1~|~1~|~01/SAF~|~Split for traffic signal work. 100417~|~1~|~1~|~01/IMS~|~100% state funded split for approach work 114673~|~1~|~1~|~01/IMS~|~Rehab/repair culverts 114673~|~1~|~2~|~02/NHS~|~Rehab/repair culverts. 114673~|~1~|~3~|~03/S>2~|~Repair/rehab culverts. 121615~|~1~|~1~|~01/CMQ~|~Plan Split for MPO CMAQ funded scope 101181~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 32 9.73-9.79. NHS route funded 80 federal/20 state. 101181~|~1~|~3~|~03/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 32 9.79-10.45. NHS route funded 80 federal/20 local in the City of Belpre. 101181~|~1~|~4~|~04/NFA~|~Resurface Veto Lake parking lot/road with 100% State ODNR funds. Work includes replacing stop blocks and pavement marking. 101181~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 339 8.57-13.57. Rural other federal aid funded 80 federal/20 state. 98985~|~1~|~1~|~01/MPO~|~Kinsman Township sidewalks. 109170~|~1~|~1~|~01/SAE~|~Replacement and upgrades to existing guardrail and bridge and anchor assemblies on various county roads in Greene County, OH. 108009~|~1~|~1~|~01/NFP~|~All locations. 110986~|~1~|~1~|~01/MPO~|~Safety and NOACA work 81058~|~2~|~2~|~02/NHS~|~This is for part 2 81058~|~2~|~3~|~03/NFP~|~For ineligible items of part 2. 81058~|~1~|~1~|~01/NHS~|~4800362 LUC SR2 21.1 Intersect: Otter Creek 95850~|~1~|~1~|~01/MPO~|~Resurfacing of CR-564 (Robinson Road) from Wilson Avenue to Struthers Coitsville Road. Resurfacing of Warhurst Road (CR-573) from SLM 0.00 to SLM 0.34 and Tenney Avenue from SLM 0.00 to SLM 0.95, in the City of Campbell, Mahoning County, Ohio. 96076~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for salt storage building and loader storage building at the proposed site for new Alexandria OP in Licking County at SR 37/SR 161 interchange - (Lic-37-11.81) 122505~|~1~|~1~|~01/STR~|~All work included in this split. 118514~|~1~|~1~|~01/MPO~|~Federal items 118514~|~1~|~2~|~02/MPO~|~Federally ineligible items. 98714~|~1~|~1~|~01/STR~|~Resurfacing of MAH-US 62 from 1.01 to 7.41 and MAH-SR 630 from 0.88 to 2.56. 98714~|~1~|~2~|~02/S>2~|~Resurfacing of MAH-US 62 from 7.41 to 7.61 and MAH-SR 630 from 0.00 to 0.88. 98714~|~1~|~3~|~03/S<2~|~Resurfacing of MAH-US 62 from 0.00 to 1.01. 98714~|~1~|~4~|~04/STR~|~Minor bridge work to linked structure >20' span. 124065~|~1~|~1~|~01/NFA/COS~|~Rehabilitation of structure (SFN 1630024) on Coshocton County Road 28. 101853~|~1~|~1~|~01/ENH~|~Transportation Alternative Program funded construciton at 95% federal TAP/5% local. 103163~|~1~|~1~|~01/MPO~|~The construction of the multi-purpose trail eligible for MPO Enhancement funds 103163~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work not eligible for MPO or ODNR funds. 96724~|~1~|~1~|~01/NFA~|~Trumbull County West Farmington Outpost, build 3 Bay Cold Storage building with electric for block heaters 116834~|~1~|~1~|~01/S>2~|~Split for bridge replacement work over various railroads 118670~|~1~|~1~|~01/STR~|~MRG 78-10.96 165 ft landslide repair with drilled shafts. Funded 80% Federal/20% State GSM. 113295~|~1~|~1~|~01/NFP~|~Resurfacing in Kiser Lake State Park. 119483~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing CEAO LBR Federal Funds at 100% up to CAP. 103804~|~1~|~1~|~01/NHS~|~Overhead Sign Truss Replacement at RIC -US-0030-14.09 120177~|~1~|~1~|~01/SAE~|~Construct a Roundabout 100621~|~1~|~1~|~01/NHS~|~Minor rehabilitation of JEF-22 including asphalt overlay, pavement repairs, guardrail and pavement markings. 95324~|~1~|~1~|~01/ENH~|~Construction of a 10-foot wide multi-use bike path that will extend a local connection to the local and regional bikeway system 86463~|~1~|~1~|~01/NFA~|~Oasis Segment 1-Riverfront Transit Center to Boathouse: Provide rail on a combination of new alignment and existing track along with rail stations for connections at riverfront locations. (1 mile) Oasis Segment 2-Boathouse to US 50 in the Village of Fairfax: Provide rail on existing rail R/W controlled by SORTA, Upgrade structures as necessary, establish rail stations for possible neighborhood connections and connections at Lunken Airport and Linwood area. (7 miles) Oasis Segment 3-Village of Fairfax to Village of Newtown: Establish a new rail corridor along shared new highway to coincide with Highway Segment II/III, establish 2 multimodal transit hubs at US 50 and Newtown Road. (4 miles) Oasis Segment 4-North of the Village of Newtown to City of Milford: Provide rail on or along existing rail corridor, establish a station at Ancor Industrial Complex and multi modal station at the City of Milford. (5 miles) 93611~|~1~|~1~|~01/SAE~|~100% federal funding for items eligible Safe Route To School funding. 99766~|~1~|~1~|~01/STR~|~Bridge removal project. WAS 821 6.70, SFN 8405433. Rural other federal aid funded 100% state. Type C Emergency. 92967~|~1~|~1~|~01/ERD~|~Construct a 15' wide multi-use trail path between Collins Avenue and Corbin Street on an alignment that runs primarily on or at the top of the bank of the Ohio River, except in areas where physical constraints and/or right of way availability prohibit. Construction of retaining walls near the top of the Ohio River bank will be required to accommodate grading and aid with slope stabilization. 113023~|~1~|~1~|~01/NFP~|~All work in this plan split using funds from the District Preservation Program 100% SAC 4PS7. 100038~|~1~|~1~|~01/BRO~|~The existing continuous slab bridge (HAS-151-0485, SFN 3402010) will be replaced with a new bridge on the existing alignment. 110684~|~1~|~1~|~01/S<2~|~Construction Inspection 110684~|~1~|~2~|~02/S<2~|~Construction Inspection 110684~|~3~|~3~|~03/S<2~|~Construction Inspection 88888~|~1~|~3~|~03/S<2/COLU~|~80/20 Resurfacing in the City of Columbiana. 88888~|~1~|~5~|~05/S<2~|~See linked structure. 88888~|~1~|~4~|~04/STR~|~See linked structures. 88888~|~1~|~2~|~02/S<2~|~Resurfacing MAH SR 46 from 0.14 to 0.74. 88888~|~1~|~1~|~01/STR~|~Resurfacing MAH SR 46 from 0.74 to 8.54, includes minor culvert work to SFN 5000971 and SFN 5000858. 119034~|~1~|~1~|~01/STR~|~Rural plan split for storm sewer work along DEL-37-6.50-6.73. 105725~|~1~|~1~|~01/MPO~|~Split for Part 1 MPO eligible funded resurfacing work from SCL to Norwood and Farnsleigh to Fairmont. 105725~|~1~|~2~|~02/NFP~|~Split for Part 1 non-eligible funded resurfacing work from SCL to Norwood and Farnsleigh to Fairmont. 105725~|~2~|~3~|~03/SAF~|~Split for Part 2 intersection safety work at Shaker Blvd intersection. 105725~|~2~|~4~|~04/NFP~|~Split for Part 2 non-eligible work for intersection safety work at Shaker Blvd intersection. 92895~|~1~|~1~|~01/SAF~|~Section Improvement- Turn Lanes/Access control/Misc Split Funded with RCRPC/Village of Bellville/District Allocation/Safety Funds. 92895~|~1~|~2~|~02/SAF~|~Adjust 10 each Manholes to Grade. Richland County Funding Responsibility. 123943~|~1~|~1~|~01/S>2~|~Roadway reconstruction, curb, sidewalk, streetlights, catch basins, signals, curb ramps, and multi-use side path. 87480~|~1~|~1~|~01/MPO~|~Bridge replacement of SFN 1247778 CLA CR 380 0145. 108585~|~1~|~1~|~01/NFP~|~The VILLAGE will improve Industrial Drive starting at SR97 124449~|~1~|~1~|~01/MPO/STCE~|~Intersection improvements. 93869~|~1~|~1~|~01/IMS~|~Replacement of two signals in the City of Girard. 93023~|~1~|~2~|~02/STR~|~Bridge painting project. HOC 328 11.33 (SFN 3703878). Federal 80% and State 20%. 93023~|~1~|~1~|~01/NHS~|~Bridge painting project. HOC 33 8.30 (SFN 3700429) and ATH 682 0.04 (SFN 0500925). Federal 80%, State 20%. 100667~|~1~|~1~|~01/STR~|~Resurfacing COL-45 fro SLM 19.63 to 22.03 with fine graded polymer overlay and COL-558 from SR 7 to SR 46 with asphalt concrete overlay, including pavement repairs and pavement markings. 100667~|~1~|~2~|~02/NFA~|~Resurfacing COL-558 from SR 45 to SR 517 including asphalt overlay, pavement repairs and pavement markings. 102348~|~1~|~1~|~01/S<2~|~SR 9 16.07 to 16.78 1" 424 FGP 102348~|~1~|~2~|~02/STR~|~SR 9 16.78 to 23.39 1" 424 FGP 113147~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work. 122217~|~1~|~1~|~01/SAF~|~converting 4 leg intersection to a single lane roundabout. 100212~|~1~|~1~|~01/S>2~|~District 7 general construction inspection 105438~|~1~|~1~|~01/STR~|~Install fiber optic cable and other items necessary using the local routing 105740~|~1~|~1~|~01/STR~|~District preservation funds at a rate of 80% federal SAC 4PF7 and 20% state SAC 4PS7. This bridge meets the state but not the federal definition of a bridge. 105740~|~1~|~2~|~02/BRF~|~District preservation funds at a rate of 100% state funds SAC 4PS7. The bridge in this split is on a Minor Collector and but eligible for federal off system bridge funds. 110115~|~1~|~1~|~01/IMS~|~Generic plan split for crack sealing interstate routes. Route to be determined. 120877~|~1~|~1~|~01/STR~|~All work is included in this split 122974~|~1~|~1~|~01/SAF~|~Plan Split for safety-funded scope 91943~|~1~|~2~|~02/NHS~|~District Preservation Program funds SAC 4PF7 and 4PS7. NHS. No local funds. Work inside the Kenton Urban Area but outside the City of Kenton. Work on SR 31 on the left side from 9.87 to 9.96 and on the right side from 9.87 to the end of the project at 10.18. This section of SR 31 was added to the NHS with MAP-21 because it is a Principal Arterial. 91943~|~1~|~1~|~01/STR~|~District Preservation Program funds SACs 4PF7 and 4PS7. Rural STP. No local funds. Work on SR 31 from the county line at 0.00 to the Kenton Urban Area Boundary at 9.87. 91943~|~1~|~3~|~03/NHS/KENT~|~Federal funds from the District Preservation Program budget SAC 4PF7. The 20% will be paid by the City of Kenton. Work inside the City of Kenton. Work on SR 31 on the left side from 9.96 to the end of the project at 10.18. No work on the right side. This section of SR 31 was added to the NHS with MAP-21 becuase it is a Principal Arterial. 104878~|~1~|~1~|~01/NHS~|~SCI US52 2.44 (SFN 7300514) 104878~|~1~|~2~|~02/NHS~|~Bridge replacement SCI 52 10.15 SFN 7300514Bridge under 20ft. 101222~|~1~|~1~|~01/STR~|~Resurfacing. 94454~|~1~|~1~|~01/BRF~|~"01/BRF/BR/GCEO" - CEAO LBR Funding 4B87(80% Federal) / LNTP(20% Local) - CAP at $330,000.00 @ 80% - Replacement of 3034968 GUE TR9420 1.46 Intersect: Leatherwood Creek; BR Eligible for Replacement: Length=62 SD/FO(1) SR=25.0 DSR=5 109104~|~1~|~1~|~01/BRO~|~All the work of the project. 80% federal funds and 20% state funds from the District budget. 106635~|~1~|~1~|~01/ENH~|~Railroad rehabilitation of the Hocking Valley Scenic RR. Federal TAP funds at 80% rate, 15% of TRC and 5% local. Final funding is 95% Federal and 5% Local. 120923~|~1~|~1~|~01/S5K/ASHT~|~Reconstruction, full pavement replacement. 110796~|~1~|~1~|~01/STR~|~District Allocation-4PS7 funds. Replace School Flashers. 110796~|~1~|~2~|~02/STR~|~Maintenance 4CP7 funds- Replace UPS batteries. 100573~|~1~|~2~|~02/STR~|~JAC 788 (2.50-6.22) 100573~|~1~|~1~|~01/S<2~|~JAC 788 (0.49-2.50 & 6.22-6.27) 88787~|~1~|~2~|~02/IMS~|~Bridge Work RIC-430-10.02/RIC-071-17.53 sfn:7006284 88787~|~1~|~1~|~01/S<2~|~Resurfacing RIC-039-16.80-17.34 / RIC-430-07.00-10.02 80666~|~1~|~1~|~01/NFA~|~Bikeways added to Warren Riverwalk/Packard. 87587~|~1~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Cracksealing on 1) Cos-36-16.14-16.40, 2) Gue-40-9.35-11.99, 3) Kno-229-10.73-14.41 87587~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Cracksealing on 1) Cos-36-7.05-16.14, 2) Gue-40-11.99-16.18, 3) Kno-229-14.41-25.38 87587~|~1~|~5~|~05/NFA~|~"05/NFA/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Cracksealing on Gue-313-(0.00-1.24) 87587~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Crack sealing on 1) Gue-22-9.28-11.01, 2) Cos-36-16.40-19.06, 3)Gue-22-11.01-14.66, 4)Kno-13-0.00-7.36 87587~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Crack sealing on GUE IR70 6.55-17.50 102990~|~1~|~1~|~01/NFA~|~Bridge replacement project on NOB SR 146, SFN 6102344. Not on any federal aid system. Funded 100% state. 112124~|~1~|~1~|~01/S<2~|~Pavement rehabilitation on SR 344 from South Lincoln Ave to SE Salem corp limit; 95% Small City funds (4B97) and 5% Local funds (LNTP). 87939~|~1~|~2~|~02/S<2~|~"02/S<2/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile Encasement work on 1) 6400094 PER SR13 1.96 Intersect: Sunday Creek; Not BR Eligible for Rehabilitation: Length= 112 SD/FO(0) SR=84.1 DSR=7; 2) 6403603 PER SR669 12.47 Intersect: Moxahala Creek; Not BR Eligible for Rehabilitation: Length= 119 SD/FO(0) SR=67.21 DSR=6; 87939~|~1~|~3~|~03/STR~|~"03/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile Encasement work on 6403573 PER SR669 7.02 Intersect: Buckeye Fk Of Jonathan Cr; Not BR Eligible for Rehabilitation: Length= 76 SD/FO(0) SR=96.6 DSR=6 87939~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile Encasement work on 2300222 FAI US22 13.07 Intersect: Hunters Run; BR Eligible for Rehabilitation: Length= 86 SD/FO(1) SR=63.8 DSR=7 88213~|~1~|~1~|~01/STR~|~Reconstruction of West Street (SR 185) within the Village of Versailles. District funds to pay for resurfacing on DAR SR 185 SLM 5.29 to 5.45. 116231~|~1~|~1~|~01/STR~|~FY28 Chipseal 107729~|~1~|~1~|~01/STR~|~Landslide repair project. MOE SR 536 8.50, DSR MOE-007. 100% Federal ER funds. 115489~|~1~|~1~|~01/IMS~|~Added CC funding split HAM SR 264 16.36R 104909~|~1~|~1~|~01/NFA~|~Elmwood School Bus Replacement 93012~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on Lic-IR 70-15.72 to 19.54 93012~|~1~|~2~|~02/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Deck sealing on identified structured 89172~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 124 54.43. SFN 5301807. Rural other federal aid funded 80 federal/20 state. 105330~|~1~|~1~|~01/STR~|~Smooth seal on rural route: AUG SR 197 SLM 7.44 to 13.44 117649~|~1~|~1~|~01/BRO~|~Split for bridge replacement work 110298~|~1~|~1~|~01/SAF~|~Upgrading the VSL communications lines using federal/state safety funds 111417~|~1~|~1~|~01/IMS~|~Deck replacements on existing structures. 111417~|~1~|~2~|~02/IMS~|~Widening of existing structures for future 3rd lane (currently for MOT). 106644~|~1~|~1~|~01/ENH~|~Bridge replacement project on Locust Street (0566268). 94296~|~1~|~1~|~01/CMQ~|~40 signalized intersections within the City of Mason 94118~|~1~|~2~|~02/STR~|~See linked structures >20' span. 94118~|~1~|~1~|~01/STR~|~Resurfacing TRU-SR 7 from 17.02 to 23.48 and TRU-SR 305 from 23.97 to 26.54. 118988~|~1~|~1~|~01/SAF~|~Split for turn lane addition 111403~|~1~|~1~|~01/NFP~|~Split for ITS camera replacement 112434~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 7 2.45 (CFN 1819227). NHS route funded 80 Federal/20 State. 117399~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items 111299~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer FY2024 project to install new and upgrade existing guardrail on various county roads. 4HB7 - See cap comments. 120934~|~1~|~1~|~01/BRO~|~Repair abutment on bridge carrying SR 519 over TR 264 (Busby Road). 117471~|~1~|~1~|~01/NFA/STCE~|~Bridge replacement. 102660~|~1~|~1~|~01/NHS~|~Bridge Replacement: LOR-20-20.47 (SFN 4702220) 117513~|~1~|~1~|~01/NFP~|~Plan split for resurfacing within ODNR facility 104167~|~1~|~1~|~01/NHS~|~LAW 52 11.53 Phase II Rock Remediation. 104167~|~1~|~2~|~02/NHS~|~LAW 52 11.75- 15.00 resurfacing. District funding. 104167~|~1~|~3~|~03/NHS~|~LAW 52 11.75-14.08 barrier wall. 110051~|~1~|~1~|~01/IMS~|~FRA IR 670 0.87-3.88 and Roadways A & B 110051~|~1~|~2~|~02/IMS~|~Minor bridge work on 15 structures 110051~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 110051~|~1~|~4~|~04/SAF~|~All Items of work associated with the installation of Guardrail between I-670 and the existing Bike Path. 105601~|~1~|~1~|~01/STR~|~Rural plan split: MAR-4-1.69-1.79 MAR-47-2.09-8.56 MAR-203-0.43-1.19 MAR-203-3.24-7.74 MAR-309-29.21-30.09 MAR-739-3.63-3.80 MRW-61-22.86-25.27 MRW-95-6.16-8.13 MRW-95-15.49-16.81 MRW-95-17.30-19.73 MRW-95AC-0.00-1.15 PIC-674-0.00-1.22 105601~|~1~|~2~|~02/NHS~|~NHS plan split: PIC-23-1.49-5.21 PIC-23-12.92-22.63 114461~|~1~|~1~|~01/S<2~|~Resurfacing US 40 102931~|~1~|~1~|~01/BRO~|~FUL-109-1698 Bridge 94272~|~1~|~1~|~01/NFP~|~Construction of a new Athens County M&R facility. Funded 100% state. 94803~|~1~|~1~|~01/IMS~|~Funding for all work on the interstate sections 94803~|~1~|~3~|~03/S>2~|~Split for work on CUY-283 and LAK-283 94803~|~1~|~4~|~04/STR~|~Split for all work on GEA-322, GEA-168, and GEA-528 94803~|~1~|~2~|~02/NHS~|~All work on GEA-44 120346~|~1~|~1~|~01/IMS~|~Replace deck on Trabue Rd over IR 270 (existing width 66% of structure) 120346~|~1~|~2~|~02/IMS~|~Widen Trabue Rd structure to accommodate a shared use path (34% of structure) and construct a shared use path from Tenagra Way to Trabue Run Rd. 91783~|~1~|~1~|~01/STR~|~D10 Chip Seal FY 2025 South: HOC-180-7.32-11.92; HOC-664-0.00-2.89 and HOC-56-9.43-13.57. 92498~|~2~|~2~|~02/BRF~|~Rehab of bridges to add guardrail along with Full Width Ashphalt Intermediate and Surface Course 92498~|~1~|~1~|~01/SAE~|~Guardrail replacement 101376~|~1~|~2~|~02/NHS~|~See linked structures > 20' span. 101376~|~1~|~1~|~01/IMS~|~Minor rehabilitation on the linked structures > 20' span. 101376~|~1~|~3~|~03/STR~|~See linked structure > 20' span. 95787~|~1~|~2~|~02/NHS~|~WOO-6 95787~|~1~|~1~|~01/STR~|~WOO-199 116556~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing. 120082~|~1~|~1~|~01/SAF~|~Construct a roundabout on SR 172 at Alabama Ave. 120082~|~1~|~2~|~02/S>2~|~Resurfacing. 120082~|~1~|~3~|~03/STR~|~Resurfacing. 120082~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span. 95242~|~1~|~1~|~01/NFA~|~Construct a new salt building and equipment storage guilding at the Darke County Garage facility. 122401~|~1~|~1~|~01/NFA~|~Bridge replacement project on NOB CR 37 4.62 (SFN 6130038). Funded 95% Federal (80 Federal/15 Credit Bridge) / 5% Local. 107868~|~1~|~1~|~01/SAF~|~District Wide Pavement Marking/RPM 121347~|~1~|~1~|~01/NFP~|~plan split. 108002~|~1~|~1~|~01/MPO~|~Mill and resurfacing of W. Second Street from S. Progress Drive to Massie Drive. 119464~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 117543~|~1~|~1~|~01/NFP~|~Replace culverts and headers 124566~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 109347~|~1~|~1~|~01/SAF/KENT~|~Resurfacing and widening of CR 502 in the city of Kent. 98795~|~1~|~1~|~01/ENH~|~Work funded through the Transportation Alternatives Program. Historic Riley Township Bridge #6932509 Restoration Project. 111064~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 14.18-14.23. Funded 100% state ER. 114657~|~1~|~1~|~01/NFP~|~GR project FY27 98357~|~1~|~1~|~01/STR~|~STP Rural 80/20 UNI-42-0.00 to 4.50 99519~|~1~|~1~|~01/NFP~|~Guardrail district wide. 117081~|~1~|~1~|~01/S>2/YOUN~|~Bridge replacement. 108083~|~1~|~1~|~01/STR~|~Plan Split for Fast Dry Pavement Marking 108083~|~1~|~2~|~02/SAE~|~All items of work associated with the installation of Chevron pavement markings at the I-70E/270 Interchange on the West Side of Franklin County 94302~|~1~|~1~|~01/ENH~|~Adding sidewalks along Colonial Drive (CR-38) from Belmont Avenue to 5th Avenue, in Liberty Township, Trumbull County, Ohio. 92920~|~1~|~4~|~04/S<2~|~Bridge Work - Structures MED-57-0215, MED-57-0265, MED-57-0323 & MED-57-0137 92920~|~1~|~3~|~03/S<2/WADS~|~100% Local SLM 0.56 TO 02.13, 03.22 TO 03.24, (Local Paving Items) 92920~|~1~|~1~|~01/S<2~|~80/20 Fed/State SLM 0.00 TO 0.56, 02.13 TO 03.22 (Outside Corp. Limits) 92920~|~1~|~2~|~02/S<2~|~80/20 Fed/Local SLM 0.56 TO 02.13, 03.22 TO 03.24 (Inside Corp. Limits) 120043~|~1~|~1~|~01/ENH~|~Sidewalk improvements utilizing Federal Carbon Reduction and Safety funding up to Federal CAP. 119142~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 23.28-25.39 and MEG 33 0.00-4.09. 119142~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 23.28-25.39 and MEG 33 0.00-4.09. Work on the existing roadway. 119142~|~1~|~3~|~03/NHS~|~Construction of new bridges on ATH and MEG US 33. 108919~|~1~|~1~|~01/IMS~|~Spot pavement repairs on IR 71 and IR 270 123409~|~1~|~1~|~01/BRF~|~Plan split for bridge rehabilitation work. 97230~|~1~|~1~|~01/STR~|~LAW SR 141 4.06 101161~|~1~|~1~|~01/STR~|~Various bridges. 113256~|~1~|~2~|~02/NFP/KENT~|~Items paid 100% by the City of Kenton. 113256~|~1~|~1~|~01/S5K/KENT~|~Resurfacing on SR 31 and SR 53 in the City of Kenton. On the left side of SR 31 from SR 292 at 10.156 until SR 31 enters the City of Kenton on the right side at 10.298 and then on both sides of SR 31 until the Scioto River Bridge at 11.261. On SR 31 from Main Street at 11.669 to Detroit Street at 11.738. On SR 53 from the beginning of the route at Detroit Street at 0.000 to Main Street at 0.100. On SR 53 from Carroll Street at 0.627 to Pattison Avenue at 1.337. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Kenton. 113256~|~1~|~3~|~03/S5K~|~Resurfacing inside of the Kenton Urban Area but outside of the City of Kenton. On the right side of SR 31 from SR 292 at 10.156 until SR 31 enters the City of Kenton on the right side at 10.298. All funds from the District Preservation Program budget. No local funds. 122969~|~2~|~2~|~02/MPO~|~This plan split is only to be used for sidewalk and shared use path work. 122969~|~1~|~1~|~01/MPO~|~Plan split for 50/50 (ODOT/Local) items on CLE Bach-Bruxton roadway project 90890~|~1~|~1~|~01/ERD~|~Signal upgrades at three locations: IR-77/Mull Avenue/White Pond Drive, IR-77/White Pond Drive, and Collier Road/Copley Road, in the City of Akron, Summit County, Ohio. FED Earmark: TCSP 0806 114383~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - 80% Federal, 20% State 110599~|~1~|~1~|~01/STR~|~RESURFACING MAR-47-8.34-8.56, MAR-229-0.00-1.05, DEL-229-0.00-0.11, MAR-95-0.00-0.44 93492~|~1~|~1~|~01/SAE~|~Funding for construction engineering with federal funds. This project does not require a plan split. This split is being entered due to Ellis glitch that is being investigated. 90676~|~1~|~1~|~01/MPO~|~Reconstruct Collingwood Blvd in Toledo,LUC CR514 1.58-3.04 114563~|~1~|~1~|~01/STR~|~Overlay on SCI 348 114563~|~1~|~2~|~02/STR~|~Bridge PM 91617~|~1~|~1~|~01/BRO~|~Replace existing four-sided concrete box (HAS-250-2582, SFN 3402622) with a new four-sided precast concrete box on same alignment. 98013~|~1~|~1~|~01/STR~|~Bridge Replacement 99491~|~1~|~1~|~01/STR/CCEO~|~Coshocton County CEAO County Surface Transportation Program Funds - 4B77 (Federal 80%) / 4BG7 (Local 20%) - See CAP Comments - Project to resurface portions of CR 9 in Coschocton County.Construction Inspection will be performed through the District 5 Construction Office. 93198~|~1~|~4~|~04/STR~|~"04/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on 1) 4506243 LIC SR657 12.62 Intersect: Over Otter Fork Lic River; Not BR Eligible for Rehabilitation: Length=150 SD/FO(0) SR=99.2 DSR=6; 93198~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Bridge painting on 1) 1603213 COS SR751 10.6 Intersect: Evans Creek; Not BR Eligible for Rehabilitation: Length=25 SD/FO(0) SR=91.1 DSR=7; 93198~|~1~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge painting on 4503961 LIC IR70 20.15 Intersect: Ir70 Ovr Tr324 Roley Hill; Not BR Eligible for Rehabilitation: Length=165 SD/FO(0) SR=94.8 DSR=7 93198~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on 4200608 KNO SR13 10.14 Intersect: Dry Creek; Not BR Eligible for Rehabilitation: Length=143 SD/FO(0) SR=65.0 DSR=7 96711~|~1~|~1~|~01/ENH/DEF~|~Work funded by the ODOT Central Office Transportation Alternatives program. 80% federal funds with a 20% local match. The 20% local match is provided by the City of Defiance. Overage paid by the City of Defiance. 101358~|~1~|~1~|~01/IMS~|~Bridge cleaning. 101358~|~1~|~2~|~02/NHS~|~Bridge cleaning. 101358~|~1~|~3~|~03/S<2~|~Bridge cleaning. 101358~|~1~|~4~|~04/STR~|~Bridge cleaning. 105369~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal routes: CHP SR 245 SLM 0.00 to 6.16CHP SR 507 SLM 0.00 to 3.09LOG SR 273 SLM 9.91 to 12.89LOG SR 559 SLM 0.00 to 4.02LOG SR 638 SLM 0.00 to 3.99 105369~|~1~|~1~|~01/STR~|~Chip seal on rural routes: LOG SR 245 SLM 2.10 to 5.12MIA SR 589 SLM 8.94 to 11.97CHP SR 245 SLM 10.72 to 10.81CHP SR 245 SLM 10.81 to 17.06LOG SR 292 SLM 3.63 to 4.65LOG SR 292 SLM 5.41 to 10.81LOG SR 235 SLM 8.18 to 13.89LOG SR 245 SLM 5.12 to 5.84CHP SR 559 SLM 7.88 to 11.38CLA SR 41 SLM 0.00 to 3.63LOG SR 273 SLM 12.89 to 13.49 121966~|~1~|~1~|~01/SAF~|~Safety Items 107972~|~1~|~1~|~01/NFP~|~Microsurfacing 110392~|~1~|~1~|~01/NHS~|~AC overlay without repairs 110392~|~1~|~2~|~02/STR~|~Resurfacing STP 110392~|~1~|~3~|~03/S5K~|~Resurfacing 96827~|~1~|~1~|~01/ENH~|~Construction costs 80% TAP funds (4B37) and 20% Local (LNTP) 109565~|~1~|~1~|~01/S<2~|~Bridge replacement project on WAS 550 20.00, SFN 8402051. 99330~|~1~|~1~|~01/ENH~|~test 99330~|~1~|~2~|~02/IMS/ERI~|~test 99330~|~1~|~3~|~03/IMS~|~test 91806~|~1~|~1~|~01/BRF~|~"01/BRF/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6006574 MUS SR666 5.61 Intersect: Blount Run #; BR Eligible for Rehabilitation: Length=31 SD/FO(1) SR=49.7 DSR=3 93678~|~1~|~3~|~03/NFA~|~For work on SR 330 in Hancock County from the NCL on Vanue at 1.14 to SR 568 at 3.00. 100% state funds from the District Preservation Program. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds. Road is a Rural Minor Collector that is not eligible for federal funds. 93678~|~1~|~1~|~01/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Resurfacing on HAN SR 568 from 2.11 to the Finday Urban Area boundary at TR 242 (4.40) on both sides of the road. No local funds. 93678~|~1~|~2~|~02/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Resurfacing on HAN-568 from the Findlay Urban Area boundary at TR 242 (4.40) to the end of the work at 11.26 and and all work on WYA-568 which is from 0.00 to 4.15. 96341~|~1~|~1~|~01/MPO~|~Construction of a sidewalk on the south side of Scott Street, from approximately 390 feet west of Westgate Drive to Westgate Drive, and the installation of pedestrian signal heads at the intersection of State Road (SR-264) and Miami Avenue. 111618~|~1~|~1~|~01/S<2~|~City of Dublin Urban Paving Split: FRA-745-0.69-0.71, 0.96-2.96 DEL-745-0.00-0.84 111618~|~1~|~3~|~03/S50~|~100% City of Dublin Cost items - pavement repairs, special striping. 111618~|~1~|~2~|~02/S>2~|~General System Plan Split: FRA-745-0.71-0.96, DEL-745 109941~|~1~|~1~|~01/STR~|~Culvert replacement 107173~|~1~|~1~|~01/STR~|~Concrete bridge deck overlay. NOB 147 13.41 (SFN 6102956). Rural other federal aid funded 80 federal/20 state. 93849~|~1~|~1~|~01/SAF~|~Safety funding to replace guardrail at piers 01/SAF/OT/ 98207~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - District Preservation 4PF7 (090% Federal) / 4PS7 (10% State) - No CAP - Fast Dry Pavement Markings on Interstate Routes for: FAI-70-(0.00 to 2.38), LIC-70-(0.00 to 29.42), MUS-70-(0.00 to 1.46). 98207~|~1~|~5~|~05/S>2~|~"05/S>2/OT/ "- District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings: FAI-204A-(0.00 to 0.49), FAI-204-(0.36 to 6.93), FAI-256-(5.99 to 6.53), LIC-40-(0.36 to 6.14) 98207~|~1~|~4~|~04/NHS~|~"04/NHS/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on NHS Routes: FAI-33-(0.00 to 5.10), FAI-33-(8.08 to 17.44), KNO-13-(11.81 to 23.11), LIC-13-(11.90 to 23.40), LIC-16-(7.22 to 15.96), LIC-16-(24.58 to 33.14), LIC-62-(0.00 to 4.71), LIC-79-(4.11 to 4.17), LIC-79-(4.60 to 6.56) 98207~|~1~|~6~|~06/NFA~|~"06/NFA/OT/ " - District Preservation 4PS7 (100% State) - No CAP - Fast Dry Pavement Markings: FAI-188-(24.53 to 26.53), FAI-312-(0.00 to 3.75), HOC-312-(0.00 to 0.40), KNO-205-(0.26 to 6.94), KNO-657-(0.00 to 4.93), KNO-715-(0.00 to 4.26), LIC-657-(0.86 to 14.91), LIC-668-(0.00 to 2.73), PER-188-(0.00 to 4.48), PER-204-(10.00 to 18.66), PER-312-(0.00 to 4.99), PER-383-(0.00 to 1.50), PER-555-(0.74 to 3.77), PER-668-(17.64 to 26.35), PER-757-(0.00 to 5.68) 98207~|~1~|~2~|~02/S<2~|~?02/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on OFAH-Urban routes for: FAI-22-(11.74 to 11.96), FAI-22-(11.96 to 13.15), FAI-22-(18.05 to 18.08), FAI-22-(18.08 to 18.67), FAI-37-(9.73 to 10.40), FAI-37-(10.40 to 12.92), FAI-37-(13.69 to 14.40), FAI-37-(19.70 to 19.74), FAI-188-(16.02 to 19.05), FAI-204-(13.86 to 16.80), FAI-360-(0.00 to 1.72), KNO-3-(18.95-20.59), KNO-229-(9.53 to 14.41), KNO-586-(11.37 to 12.92), KNO-661-(6.10 to 6.46), LIC-40-(14.37 to 16.66), LIC-37-(16.43 to 17.29), LIC-79-(1.24 to 4.11), LIC-79-(16.43 to 17.18), LIC-310-(1.71 to 2.61), LIC-310-(5.62 to 7.88), LIC-360-(0.00 to 0.22), LIC-657-(0.00 to 0.86), LIC-661-(0.00 to 1.79) 98207~|~1~|~1~|~01/STR~|~"01/STR/OT/ "- District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on OFAH-Rural routes for: FAI-22-(0.00 to 10.54), FAI-22-(10.75 to 11.74), FAI-22-(0.00 to 10.54), FAI-22-(18.67 to 26.07), FAI-37-(0.00 to 9.73), FAI-37-(19.74 to 28.20), FAI-158-(2.48 to 15.83), FAI-159-(0.00 to 10.57), FAI-188-(19.05 to 24.53), FAI-204-(6.93 to 13.86), FAI-204-(16.08 to 19.13), FAI-256-(6.53 to 24.63), FAI-664-(0.00 to 12.62), HOC-668-(0.00 to 0.16), KNO-3-(20.59 to 34.71), KNO-36-(0.00 to 10.14), KNO-36-(20.85 to 35.87), KNO-62-(0.00 to 22.65), KNO-95-(0.00 to 11.50), KNO-205-(0.00 to 0.26), KNO-229-(14.41 to 25.38), KNO-314-(0.00 to 2.73), KNO-514-(0.26 to 7.93), KNO-546-(0.00 to 2.15), KNO-586-(0.00 to 3.28), KNO-586-(3.41 to 11.37), KNO-661-(0.00 to 6.10), LIC-40-(6.14 to 14.37), LIC-40-(16.66 to 19.61), LIC-40-(28.60 to 30.14), LIC-62-(4.71 to 20.64), LIC-37-(0.00 to 11.69), LIC-37-(16.59 to 24.43), LIC-37-(25.08 to 25.84), LIC-79-(0.00 to 1.24), LIC-79-(16.25 to 33.10), LIC-146-(0.00 to 2.43), LIC-158-(0.00 to 0.77), LIC-158-(1.13 to 2.28), LIC-310-(7.88 to 10.05), LIC-310-(10.32 to 13.45), LIC-586-(0.00 to 11.35), LIC-661-(1.79 to 14.81), MRG-37-(0.00 to 0.11), MRG-555-(23.06 to 23.74), MUS-40-(0.00 to 1.08), PER-22-(0.00 to 14.27), PER-13-(0.00 to 28.15), PER-37-(0.00 to 8.59), PER-37-(15.02 to 20.69), PER-93-(0.00 to 1.07), PER-256-(0.00 to 0.16), PER-345-(0.00 to 9.22), PER-555-(3.77 to 4.33), PER-595-(0.00 to 2.10), PER-668-(0.00 to 10.19), PER-668-(11.00 to 16.88), PER-669-(0.00 to 6.34), PER-669-(6.97 to 10.15) 122768~|~1~|~1~|~01/S>2~|~Bridge rehab Municipal Bridge Program 105158~|~1~|~1~|~01/NHS~|~Plan Split for the NHS section on CLE-52. Includes patching of bridge CLE-52-23.46 wearing surface. 109388~|~1~|~1~|~01/ENH~|~Plans split for Bikepath 109388~|~1~|~2~|~02/NFP~|~Plans split for 100% City items - Possible sewer work 88788~|~1~|~1~|~01/S>2~|~Cheviot Road: from the south intersection with Blue Rock Rd. to Galbraith Rd. Project includes the realignment of Blue Rock Rd. at the north intersection with Cheviot Rd and addition of left-turn lanes on Cheviot Rd. at the intersection; resurfacing of Cheviot Rd.; and reconfiguring the lanes on Cheviot at the south intersection with Blue Rock Rd. 92656~|~1~|~1~|~01/MPO~|~Resurfacing CR 508 0.09 - 0.39 110585~|~1~|~1~|~01/STR~|~Paving and miscellaneous work on UNI/DEL/MAR SR 4 including edge line rumble stripes 110585~|~2~|~3~|~03/STR~|~Pave top 1 1/2 inches on SR 37 and pavement markings 110585~|~1~|~2~|~02/SAF~|~Install center line rumble stripes UNI/DEL/MAR SR 4 110585~|~1~|~5~|~05/STR~|~All bridge work associated with MAR-4-1.79, SFN 5100038 110585~|~1~|~4~|~04/STR~|~All bridge work associated with UNI-4-25.78, SFN 8000344 21964~|~1~|~1~|~01/STR~|~Brdg Replacement. 0.35 MI NE OF CR34. 0101265 ADA SR41 20.28 Intersect: Murphy Run80 Fed/20 State. 01/STR/BR/State 100463~|~1~|~1~|~01/STR~|~Chip Sealing of CAR-39, HAS-9, and HAS-519 109610~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 555 23.09, SFN 5801982. 114332~|~1~|~1~|~01/NFA/TRCE~|~Rehabilitation of West Market Street bridge over the Mahoning River. 105406~|~1~|~1~|~01/NHS~|~Bridge repair on NHS route. 105406~|~1~|~2~|~02/STR~|~Bridge rehab on rural bridge. 102416~|~1~|~1~|~01/NHS~|~STA US 62 from 8.34 to 8.50 102416~|~1~|~2~|~02/STR~|~STA US 62 from 3.96 to 4.87 102416~|~1~|~4~|~04/S>2~|~STA US 62 from 4.87 to 8.34 102416~|~1~|~3~|~03/STR~|~See linked structures >20' span. 102416~|~1~|~5~|~05/S>2~|~See linked structures >20' span. 114975~|~1~|~1~|~01/STR~|~This split is for the portion of SR 111 that is outside the Defiance Urban area. Funding is from district allocations using SACs 4PF7 (80%) and 4PS7 (20%). 83030~|~1~|~3~|~03/STR~|~"O3/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markings on FAI SR664 0-7.47 83030~|~1~|~1~|~01/STR~|~"O1/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on FAI SR664 0-7.47 83030~|~1~|~2~|~02/NFA~|~"O2/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) FAI SR312 0-3.75; 2) HOC SR312 0-0.4; 3) PER SR312 0-4.99 83030~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Resurfacing on 1) FAI SR312 0-3.75; 2) HOC SR312 0-0.4; 3) PER SR312 0-4.99 118164~|~1~|~1~|~01/SAF~|~Safety improvements along Harshman Road in the City of Riverside 100276~|~1~|~1~|~01/NHS~|~Single and Double Microsurfacing of STA-US 30-0.00 to 9.58 96132~|~1~|~1~|~01/NFP~|~Material Storage Shed at the Peebles Outpost 105721~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 123101~|~1~|~1~|~01/SAF~|~work for left turn lane 95953~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority 94383~|~1~|~3~|~03/S<2~|~Fed/City STP<200,000 within Bucyrus corp. limits - CRA 98 5.50-6.80 94383~|~1~|~5~|~05/NHS~|~Fed/City NHS within Bucyrus corp. limits - CRA 4 8.45-8.87 94383~|~1~|~7~|~07/STR~|~Bridge Work:SFN 1702513 (CRA-98-4.27) 94383~|~1~|~4~|~04/S<2/BUC~|~100% City STP<200,000 within Bucyrus corp. limits - CRA 98 5.50-6.80 94383~|~1~|~1~|~01/STR~|~District Allocation 80/20 STP Rural - CRA 98 0.00-5.12 94383~|~1~|~2~|~02/S<2~|~District Allocation 80/20 Urbanzied Area - CRA 98 5.12-5.50 94383~|~1~|~8~|~08/STR~|~Bridge Work (length < 20'):SFN:1702548 (CRA-98-5.00) 94383~|~1~|~6~|~06/NHS/BUC~|~100% City NHS within Bucyrus corp. limits - CRA 4 8.45-8.87 96752~|~1~|~1~|~01/NFA~|~Reconstruction of Lexington Salem Road from Engle Road to Preble County Line Road, including widening of the roadway to 28' (includes paved shoulder). Deficient culverts and bridges will be replaced or brought up to current standards. In addition, installation of new guardrail, RPMs, pavement markings, tree trimming, and reshaping of roadway ditches will be performed. 87067~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 729 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 87067~|~1~|~3~|~03/STR~|~Plan split for work associated with bridge CLI-729-0285. 87067~|~1~|~2~|~02/STR~|~This plan split is to cover work associated with bridge CLI-729-0113. 93376~|~1~|~3~|~03/NHS/Cant~|~Installation of sidewalks along 55th Street, East of State Route 43, in the City of Canton, Stark County, Ohio. 93376~|~1~|~2~|~02/ENH/park~|~Construction of a pedestrian/bike trail tunnel under State Route 43, in the City of North Canton, Stark County, Ohio. 93376~|~1~|~1~|~01/NHS~|~Widening of SR43 from 55th Street to Applegrove. 93376~|~1~|~4~|~04/NHS/NC~|~Reconstruction of waterline and installation of sidewalks along Maple and State Route 43, in the City of North Canton, Stark County, Ohio. 76835~|~1~|~1~|~01/NHS~|~Plan split for all major rehab work. 110190~|~1~|~1~|~01/STR~|~The COUNTY will construct improvements in front of the site along SR118 to include widening SR 118, 950' north to Carthagena Road, to include a 285' NB right turn lane and a 285' SB left turn lane in to the new facility. Additionally, 285' NB right turn lane on to Carthagena Road as well as one additional access point to the facility along Carthagena Road, 540' east of SR 118. 102144~|~1~|~1~|~01/NFA~|~The City is constructing road improvements, constructing approximately 2,177 LF new road from US 68 to east Cuba Road with new Ahresty access and closure of existing Ahresty US 68 access, public rail crossing with advanced warning devices. 108376~|~1~|~1~|~01/MPO~|~Reconstruction in the City of Dayton. 114549~|~1~|~1~|~01/STR~|~AC Overlay with repairs 114549~|~1~|~2~|~02/S<2~|~AC Overlay with repairs. 114549~|~1~|~3~|~03/NFA~|~Ac Overlay with repairs. 89876~|~1~|~1~|~01/SAE~|~Construction of bicycle/pedestrian crossings on Easton, Schneider, and Marquardt, as part of Hoover Connector Trail. 118241~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items 100849~|~1~|~1~|~01/NFA~|~LAW 217 13.59-17.47 100194~|~1~|~1~|~01/S>2~|~All eligible urban paving items. 100194~|~1~|~2~|~02/NFP~|~For urban paving ineligible items (curb, curb ramps, sidewalks, full depth repairs,...) 105887~|~1~|~1~|~01/S>2~|~Plan split for urban paving resurfacing 105887~|~1~|~2~|~02/NFP~|~Split for 100% local items of work 95522~|~1~|~1~|~01/IMS~|~Perform abument patching, pier patching, backwall patching on various bridges. This split includes: SFN 5703581 MOT-048-0448. 95522~|~1~|~2~|~02/NHS~|~Perform abument patching, pier patching, backwall patching on various bridges. 86852~|~1~|~2~|~02/SAF~|~100% local participation items. 86852~|~1~|~1~|~01/SAF~|~90% Federal / 10% State Safety funding split 113999~|~1~|~1~|~01/NHS~|~Culvert and wall replacement along JEF -7 120355~|~1~|~1~|~01/NHS~|~Districtwide signal repair/maintenance. 115058~|~1~|~1~|~01/NFP~|~Split for cracksealing work 104098~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Athens County. CEAO funded. Funded 100% federal. 114094~|~1~|~1~|~01/NFP~|~Created for J&C involvement 124947~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funds 116066~|~1~|~1~|~01/NHS~|~Established Plan Split 01/NHS/PV/ - 80% 4PF7/20% 4PS7 110791~|~1~|~1~|~01/NFP~|~Landslide repair 94683~|~1~|~1~|~01/NFP~|~Rest Area Roofing - Purchase Order contract 114399~|~1~|~1~|~01/NFP~|~This is the district's systematic RPM replacement maintenance contract of prismatic reflectors that have lost reflectivity or are in need of replacement. 100081~|~1~|~1~|~01/STR~|~Bridge Repair:ASD-SR-89 04.280 SFN 0303453 (OVER JEROME FORK)Minor Rehabilitation ? Str steel repair (022) ERI-SR-13 03.670 SFN 2202409 (OVER N&S RR ) Reactive Maintenance ? Bearing reset/repl (025) Minor Rehabilitation ? Str steel repair (022)HUR-SR-303 01.930 SFN 3904083 (OVER VERMILION RIVER)Minor Rehabilitation ? Str steel repair (022) 100081~|~1~|~2~|~02/NHS~|~Bridge Repairs:ERI-SR-2 24.030 SFN 2204738 (R OVER ERI-137-0489 TH)Reactive Maintenance ? Deck patching(conc) (049) ERI-SR-2 06.180 SFN 2202824 (OVER ERI-002-0624)Reactive Maintenance ? Bearing reset/repl (025) ? Exp jt repair/repl (048) Minor Rehabilitation ? Str steel repair (022) ? Bridge railing upgrade/repair (061) Repair parapets. HUR-US-250 04.900 SFN 3901149 (OVER HUR-20-1349)Reactive Maintenance ? Deck patching(conc) (049) ? Exp jt repair/repl (048) LOR-SR-2 03.320 SFN 4707923 (L OVER BAUMHART RD CH-51)Reactive Maintenance ? Bearing reset/repl (025) Jack and Shim bearingsLOR-SR-2 03.320 SFN 4707915 (R OVER BAUMHART RD CH-51)Reactive Maintenance ? Bearing reset/repl (025) Jack and Shim beam bearings 122320~|~1~|~1~|~01/IMS~|~Plan split for deck replacement and miscellaneous repairs to Berea Freeway bridge. 120726~|~1~|~1~|~01/MPO~|~Construction of new trail to connect the Great Miami River Trail between Timberhill and Rockdale Road. 101412~|~1~|~1~|~01/IMS~|~DSR# BEL-013 116447~|~1~|~1~|~01/NFP~|~Systematic Guardrail maintenance and repair on various routes throughout District Four. 116275~|~1~|~1~|~01/IMS~|~Construction Inspection 119424~|~1~|~1~|~01/NHS~|~Plan split for sealing of mainline SR 126 bridge decks in Hamilton County. 119424~|~1~|~2~|~02/IMS~|~Plan split for sealing of bridge decks on IR-71 and IR-75. 87687~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 4304713 111662~|~1~|~1~|~01/MPO~|~Split for project eligible work 105538~|~1~|~1~|~01/S<2~|~Urbanized Area Plan Split: PIC-188-2.57-2.62 105538~|~1~|~2~|~02/STR~|~Rural Plan Split: UNI-37-12.24-12.77 107991~|~1~|~1~|~01/MPO~|~Replacement of 3-span bridge, replace traffic signal, resurfacing on local road. 112313~|~1~|~1~|~01/IMS~|~Construct a Texas Tall Wall type barrier along the outside of the ramp curve to prevent trucks and large vehicles from leaving the roadway or overturning on the exit ramp from EB i-70 to NB i-75. 112313~|~1~|~2~|~02/SAF~|~Add chevron signs to Ramps A, G, C, & E 124333~|~1~|~1~|~01/SAF~|~Intersection improvement 113590~|~1~|~1~|~01/MPO~|~TLCI Work 90821~|~1~|~1~|~01/ENH~|~Multi-use path and new bridge over US-23Sponsor is Orange Township01/ENH/OT/ 122470~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over Killbuck Creek. 123506~|~1~|~1~|~01/S50~|~Plan split for STBG eligible construction items. 93304~|~1~|~1~|~01/SAE~|~Plan Split for Battery Backup for various Traffic Signals in MAH and POR counties. 108178~|~1~|~1~|~01/IMS~|~ER event - Repair landslide that occurred. 121385~|~1~|~1~|~01/SAF~|~Plan split for pavement markings 92435~|~1~|~1~|~01/NFA~|~Bridge replacement project. Replacement of a steel beam span on stone abutments. MEG CR 35 3.75, SFN 5334020. 80% Federal/20% Local. 117778~|~1~|~1~|~01/NFP~|~Resurface Parking Area/Access Road. 107476~|~1~|~1~|~01/NHS~|~Double Microsurface the existing pavement 107476~|~1~|~2~|~02/NHS~|~100% State reinforced concrete pipe that the state is purchasing from the contractor. This is for change order 12-reason code 40 material cost reimbursement 101724~|~1~|~1~|~01/NFA/CCEO~|~Coshocton County Engineer's CEAO Bridge Funding - 4B87 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of SFN 1630407 COS-CR12-00.20 Intersecting Turkey Run - Length= 32' Width 24.5' / SD/FO=0 / SR=50.6 / DSR=5 123248~|~1~|~1~|~01/S5K~|~Pavement markings. 102232~|~1~|~1~|~01/IMS~|~Plan split for deck replacement 105086~|~1~|~1~|~01/BRO~|~All work in this split. All funds from the District Preservation Program budget. No local funds. 92514~|~1~|~1~|~01/SAE~|~A local-let Guardrail project on various county roads. 113424~|~1~|~1~|~01/SAF~|~Recessed-Wet Reflective Pavement Markings on VAR routes in D9 113424~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 91071~|~1~|~1~|~01/IMS~|~Bridge maintenance project, including: expansion joint repair, bearing re-set, slope protection, deck patching, deck sealing, beam end painting, substructure patching. 94625~|~1~|~1~|~01/NFP~|~Long line pavement markings in Portage, Stark, and Summit Counties, Ohio. 102399~|~1~|~1~|~01/STR~|~1" 424 FGP 86150~|~1~|~1~|~01/BRO~|~Bridge deck replacement for ATH 329 1494, SFN 0503606. BR eligible funded 80 federal/20 state. 88350~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds: 1805045 108358~|~1~|~1~|~01/STR~|~Pavement repairs and crack seal on rural routes: MER US 127 SLM 14.93 to 26.13 MER SR 49 SLM 13.90 to 21.45 MER SR 119 SLM 12.89 to 17.01 123326~|~1~|~1~|~01/IMS~|~Resurfacing. 123326~|~1~|~2~|~02/NHS~|~Resurfacing. 101201~|~1~|~1~|~01/SAE~|~Implement various countermeasures to improve safety of kids walking and biking to school including installing a Rectangular Rapid Flashing Beacon (RRFB) at Fourth & Sherman. 97575~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. CLE-CR 45-0326 (SFN: 1359495) in Clermont County. 93063~|~1~|~1~|~01/S<2~|~This split is for work eligible for funding with STP funds from the City of Findlay budget. 103755~|~1~|~1~|~01/SAF~|~Add thru lane on SR 32 103755~|~1~|~2~|~02/NHS~|~Resurfacing on a portion of SR 32 in Clermont County between I-275 and the eastern Batavia Corp Limit. 103755~|~1~|~3~|~03/NHS~|~Repair median barrier wall on SR 32 at approximately 8 mm. that was not in the scope of workRepair potholes that were not in the scope of work. 115466~|~1~|~1~|~01/NFP~|~Pavement repairs to Shawnee Prairie Reserve 113762~|~1~|~1~|~01/STR~|~Systematic Sign Replacement. 123516~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 92937~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7. 120415~|~1~|~1~|~01/S5K~|~Small City funded scope to reconstruct SR-53 (N Sandusky St) from Hall St to Tomb St. 120415~|~1~|~3~|~03/S5K~|~Urban Paving funding for Tomb St to City Limit 120415~|~1~|~2~|~02/SAF~|~Safety-funded scope for intersection improvement and access management. 120415~|~1~|~4~|~04/NFP~|~100% Local costs for Urban Paving project areas (full depth repair, curb, etc.) 98210~|~1~|~1~|~01/NFP~|~District Preservation Culvert Funding - 7BPB (100% State) - See CAP Comment - Various locations in District 5 93915~|~1~|~1~|~01/S>2/TOLE~|~SR-184 from Lewis (SLM 6.49) to Telegraph (SLM 7.48) from curb to curb up to 3.5" deep. 93915~|~1~|~2~|~02/NFP/TOLE~|~SR-184 from Lweis (SLM 6.49) to Telegraph (7.48) all work outside the area between the curbs and deeper than 3.5" 99639~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state 107738~|~1~|~1~|~01/STR~|~Landslide repair project, ATH 78 4.13-4.22. 100% Federal ER funds. 105021~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 10.44-10.49. Rural other federal aid funded 80 federal/20 state. 119452~|~1~|~1~|~01/S5K~|~added plan split. 107165~|~1~|~1~|~01/SAF~|~Install RCUT intersection at Eastern Road in Norton. 107165~|~1~|~2~|~02/NHS~|~Resurfacing of WAY SR 585 from 18.47 to 18.63 and SUM SR 585 from 0.00 to 0.13. 105746~|~1~|~1~|~01/NFP~|~Plan split for non-federal paving work 85172~|~1~|~1~|~01/MPO~|~Replace existing deck, sidewalk, and railing, paint existing steel beams and convert abutments to semi integral abutments on Bechtle Avenue over Buck Creek. 117929~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-E 100292~|~1~|~1~|~01/STR~|~JAC SR279 9.88 120785~|~1~|~1~|~01/SAF~|~Add a turn lane and signal improvements at Refugee and Hines Road within the City of Columbus 120785~|~2~|~2~|~02/S>2/RR~|~Railroad crossing improvements to be built by the railroad company. 99479~|~1~|~1~|~01/MPO~|~Landslide repair project. WAS 676 24.00. Work includes upgrading the storm water drainage system, sidewalk, curb and gutter. Upgrade of the guardrail and resurfacing. MPO funded at 80% federal and 20% local. 116051~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance 86586~|~1~|~1~|~01/STR~|~0800368 BRO SR41 0.89 Intersect: Fishing Gut Creek BR eligible only for rehab. This is project is to replace the brdg. 01/STR/BR/State 105898~|~1~|~1~|~01/S<2~|~Fed eligible 105898~|~1~|~2~|~02/MPO~|~Plan split to pay for both 100% locally funded items (Reference 9) as well as any over the cap construction costs. 96658~|~1~|~1~|~01/BRO~|~Work involved with a bridge on US 68, SFN 3202046, which is in the Findlay Urban Area. Funding is 80% federal funds and 20% state funds. Funds are from the District Preservation Program budget. 96658~|~1~|~2~|~02/BRO~|~Work involved with bridges on SR 12, SFNs 3200124 and 3200140, which are not in an urban area. Funding is 80% federal funds and 20% state funds. Funds are from the District Preservation Program budget. 95516~|~1~|~1~|~01/MPO~|~MORPC/Worthington funding for widening of Worthington-Galena Rd 95516~|~1~|~2~|~02/S>2~|~Items to be paid 100% by the City of Worthington 95516~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 120898~|~1~|~1~|~01/SAF~|~Sign replacement. 81721~|~1~|~1~|~01/NHS~|~Microsurfacing of BEL-7-17.74 to 19.75; includes double microsurfacing, pavement repairs and pavement marking. 114925~|~1~|~1~|~01/NHS~|~Resurfacing. 114925~|~1~|~3~|~03/STR~|~Resurfacing. 114925~|~1~|~4~|~04/NHS~|~Bridge preventative maintenance. 114925~|~1~|~5~|~05/NHS~|~Minor bridge work 10' to 20' span. 114925~|~1~|~2~|~02/NHS/RAVE~|~Resurfacing, urban paving in the City of Ravenna. 98317~|~1~|~1~|~01/NFP~|~Districtwide raised pavement marker contract 119397~|~1~|~1~|~01/S>2~|~Roadway narrowing, bicycle & pedestrian enhancements. 96182~|~1~|~1~|~01/NFP~|~Mowing contract 110309~|~1~|~1~|~01/NHS~|~Turn lane additionBRO 32 11.93 102701~|~1~|~1~|~01/MPO~|~Removing thru lanes on E Exchange St between Broadway St and Fountain St, includes adding bike lanes, parking spaces, median and signal upgrades. 109917~|~1~|~1~|~01/SAF~|~Safety project at US23 5.49 114581~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 15.95. Work includes drilled shaft walls. 90571~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 109049~|~1~|~1~|~01/SAF~|~New signal funded by ORDC 90% Federal 10% GRF/TRC. 91770~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. GAL 218 16.46-17.14. Urban other federal aid funded Federal 80% and 20% State. 91770~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. VIN 50 10.68-16.34, VIN 93 7.47-10.25 and GAL 218 11.62-16.46. Rural other federal aid funded Federal 80% and 20% State. 97114~|~1~|~1~|~01/BRF~|~The replacement of SFN 3942562 and 7260261. 117396~|~1~|~1~|~01/NFA~|~CEAO LBR bridge funding 110724~|~1~|~1~|~01/S<2~|~Landslide repair from OH19-01 ER event. 108943~|~1~|~1~|~01/CMQ~|~Signal upgrade work eligible for federal-aid 107327~|~1~|~1~|~01/STR~|~Landslide repair. 113626~|~1~|~3~|~03/NHS~|~Split added for CFN 1985229, to be funded with district preservation funds instead of ER funds. 113626~|~1~|~1~|~01/NHS~|~Rock slope repair funded by OH20-01 ER funds. Work is from SLM 14.41 to SLM 14.61. 113626~|~1~|~2~|~02/NHS~|~Slope excavation work for southern end of project beyond what is covered by ER funds. Work is from SLM 14.32 to SLM 14.41. 114440~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 90913~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal rural STP funds. 100677~|~1~|~1~|~01/S<2~|~Resurfacing JEF-213 from SR 7 to SLM 2.16 100677~|~1~|~2~|~02/STR~|~Resurfacing JEF-213 from SLM 2.16 to SR 152 82662~|~1~|~1~|~01/BRO~|~ Replace structurally deficient steel truss bridge over Muddy Creek located .55 mile East of Hillside Avenue. Hamilton County. 97978~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2020 121399~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 147 over Branch of Leatherwood Creek. 98311~|~1~|~1~|~01/NHS~|~Fast dry pavement marking contract throughout Distrixct Six 91068~|~1~|~1~|~01/STR~|~STP Rural funding for culvert work at 4 locations: DEL-61-5.10 MRW-314-0.41 MRW-314-0.61 MRW-19-4.85 82594~|~1~|~2~|~02/SAF~|~Plan Split for SFN 7752121 SUM Canton Road over Cornell Creek 82594~|~1~|~1~|~01/SAF~|~Plan Split for Widening SUM Canton Road (CR-66) from 2.32 to 3.30. From Sanitarium Road to Waterloo Road, Springfield Township, Summit County, Ohio. 114845~|~1~|~1~|~01/SAF~|~Construct new roundabout at Old Forge and Mogadore Rd intersection. 88968~|~1~|~1~|~01/CMQ~|~Plan Split for SUM Copley Road Signals 88968~|~1~|~2~|~02/NFP/AKRN~|~In-eligible signal items. 121443~|~1~|~1~|~01/STR~|~Plan split for resurfacing 96550~|~1~|~2~|~02/S<2~|~Resurfacing of ATB SR 84 from 2.14 to 2.24 and 2.60 to 2.74 and ATB SR 531 from 0.00 to 1.98, includes guardrail replacements. 96550~|~1~|~3~|~03/S<2/GENE~|~Resurfacing of ATB SR 84 from 2.74 to 3.85 urban paving within the City of Geneva. 96550~|~1~|~6~|~06/STR~|~See linked structures 10' to 20' span. 96550~|~1~|~5~|~05/S<2~|~See linked structures 10' to 20' span. 96550~|~1~|~4~|~04/S<2~|~See linked structures >20' span. 96550~|~1~|~1~|~01/NHS/GENE~|~Resurfacing of ATB-US 20 from 2.94 to 3.95 urban paving in the City of Geneva. 120926~|~1~|~1~|~01/SAF~|~Traffic signals. 113997~|~1~|~1~|~01/SAF~|~Safety improvements on CR 3 (Nelson Avenue) from SLM 2.89 to 3.29. 107162~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - No CAP - 80% Federal (4SF7)/20% State (4SS7) - slide repair on PER SR 13. 117629~|~1~|~1~|~01/NHS~|~added plan split. 103266~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers. 103162~|~1~|~1~|~01/NFP~|~Plan split for bridge work designed under this PID (Part 1) 103162~|~2~|~2~|~02/NFP~|~Split 2 for work on Mastick Rd, W.220th St, and 480 over CSX. (Part 2). 107331~|~1~|~2~|~02/S<2~|~Resurfacing projectHIG CR 98 (0.56-1.04) 107331~|~1~|~1~|~01/STR~|~Resurfacing VAR CR. 99712~|~1~|~1~|~01/NFP~|~Lighting maintenance and repair along various routes in Portage, Stark, and Summit Counties. 99712~|~1~|~2~|~02/IMS~|~Reconstruction of assorted median lighting along IR-76 in downtown Akron, Summit County, Ohio. 90912~|~1~|~1~|~01/NHS~|~ASD US 0224 11.12-Install a structral liner in twin bridge culverts. 77478~|~1~|~1~|~01/IMS~|~Resurfacing 86885~|~1~|~1~|~01/NHS~|~resurface FUL US20 0.99-10.76; CR-27 to SR 108and smoothseal WIL-20 86885~|~1~|~2~|~02/NHS~|~For 6 bridges on US-20 121979~|~1~|~1~|~01/STR~|~Provide sidewalk, curb bump outs and RRFBs along SR's 161, 347 and 739 in the villages of Broadway, Raymond, Irwin and Milford Center in Union County 25354~|~1~|~1~|~01/IMS~|~Planning Split for any bridge work included in the project. Assumed 70% of the total cost. 25354~|~1~|~2~|~02/IMS~|~Planning Split for any roadway work included in the project. Assumed 30% of the total cost. 100413~|~1~|~1~|~01/NFP~|~Reconstructing Industrial Prkway, E. Bluegras Drive and widening the intersection of Industrial Prkway and Republic Street 97968~|~1~|~1~|~01/ERD/MCEO~|~Muskingum County Engineer's Pavement Project - 4R47 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing of CR 723 (North Pointe Road) 02.53 to 08.42 123644~|~1~|~1~|~01/NFP~|~Plan spit for crack sealing various routes on District 12, preventative maintenance. 115385~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip-seal treatment. 115385~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip-seal treatment. 114553~|~1~|~1~|~01/S<2~|~Minor widening of the inner portion of the roundabout with drainage modifications to allow access for very large trucks. 119671~|~1~|~1~|~01/NFA~|~Replace bridge carrying SR 646 over unnamed tributary to Irish Creek. 105380~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural route: MER SR 707 SLM 13.09 to 16.11 114787~|~1~|~1~|~01/IMS~|~Seal mainline bridges on I-71 and I-75 in Warren County 86695~|~1~|~1~|~01/MPO~|~SR93 0.00 New Ironton Russel Bridge (SFN 4401263), construct an Inspection Travler under structure. Project Description: It is proposed to make an inspection traveler under the new Ironton/Russell Bridge (SFN 4401263) with a generator and air compressor on the reaveler. This is not a bridge cost.01/MPO/BR/State 122016~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County. 105929~|~1~|~1~|~01/MPO~|~Resurfacing work eligible for federal-aid 113507~|~1~|~1~|~01/NHS~|~2" mill and fill with asphalt concrete in the City of Greenville: 113507~|~1~|~2~|~02/S<2~|~2" mill and fill with asphalt concrete in the City of Greenville: 82288~|~1~|~1~|~01/IMS~|~Add fourth lane and auxiliary lane on I75 between Shepherd and Glendale Milford. Upgrade interchanges of Shepherd and Glendale Milford. 82288~|~1~|~2~|~02/IMS~|~Rehabilitation of pavement as part of the widening of I75 from Shepherd to Glendale Milford Road, for an additional lane in each direction with auxiliary lanes. 82288~|~1~|~3~|~03/IMS~|~This plant split is to relocate Lockland Water Works in Evendale. 82288~|~1~|~4~|~04/IMS~|~Aesthetics paid by the Local - Village of Evendale. 117378~|~1~|~1~|~01/MPO/SEBR~|~Resurfacing. 123132~|~1~|~1~|~01/IMS~|~Landscape Maintenance along Interstate 95008~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split. 118733~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 82 3.51. Funded 100% Federal. 101537~|~1~|~1~|~01/S<2~|~Smoothseal (Urbanized Area) Galion 101537~|~1~|~2~|~02/STR~|~Smoothseal (Rural) 102326~|~1~|~2~|~02/STR~|~Resurfacing and widening of pavement and shoulders and improve intersection geometry on various county roads in Mercer County. 102326~|~1~|~1~|~01/S<2~|~Resurfacing and widening of pavement and shoulders and improve intersection geometry on various county roads in Mercer County. 102326~|~1~|~3~|~03/NFA~|~Resurfacing and widening of pavement and shoulders and improve intersection geometry on various county roads in Mercer County. 124686~|~1~|~1~|~01/IMS~|~Plan split for removal of a pedestrian bridge that is no longer needed. 120453~|~1~|~1~|~01/IMS~|~Culvert rehab 115814~|~1~|~1~|~01/STR~|~Resurfacing in Pike County. 112609~|~1~|~1~|~01/MPO~|~Split for MPO funded resurfacing work from City of Painesville Corp Line to just south of Washington Street. 112609~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work from SR-84 to City of Painesville Corp Line & from City of Painesville Corp Line to just south of Washington Street at 100% City of Painesville funding. 101830~|~1~|~1~|~01/NFP~|~Chip seal and asphalt resurfacing of various access and service roads. 76174~|~1~|~2~|~02/BRO~|~District Alloc. BR Elig funded bridge: 4802888 LUC IR75 1.39 Intersect: Sr 2-Nsrr & Emerald Ave4802977 LUC-75-1.674803574 LUC-75-4.904803396 LUC-75-4.614802764 LUC-75-0.27 76174~|~1~|~1~|~01/IMS~|~District Alloc. funded bridges (Bridge In-eligible)4802853 LUC IR75 1.3 Intersect: Segur Ave4802942 LUC IR75 1.67 4803639 LUC-75-5.04 L4803663 LUC-75-5.04 R4803728 LUC-75-5.20 L4806816 WOO-23-33.74 96471~|~1~|~1~|~01/BRF/PATA~|~Municipal Bridge Program - 4R87 (80% Federal) / 4BG7 (20% Local) - CAP (See Project CAP Comments) - City of Pataskala Bridge replacement of Lic TR 38 4.42 carrying Columbia Road over Muddy Fork 122163~|~1~|~1~|~01/S>2/PICK~|~SRTS - Design and construction of sidewalks in the City of Pickerington / Fairfield County. 119459~|~1~|~1~|~01/ERD~|~Plan split for eligible resurfacing work. 124913~|~1~|~1~|~01/STR~|~Culvert replacement. 88732~|~1~|~1~|~01/S<2~|~Crack Seal - MED-003-08.56 - 09.87 / LOR-057-06.43 - 07.98 88732~|~1~|~2~|~02/STR~|~Crack Seal - MED-003-03.90 - 08.56 / LOR-057-0.00 - 06.43 88732~|~1~|~3~|~03/NHS~|~Craj Seal - MED-224-00.00 - 06.41 90949~|~1~|~1~|~01/SAF~|~Work on Wayne Street. Federal safety funds and MPO-STP funds. The match and funds needed over the cap will be provided by the City of Lima. The safety funds are to be used before the MPO-STP funds. The MPO-STP funds can be used for the construction engineering subphase. The safety program funds cannot be used for the construction engineering subphase. 90949~|~1~|~2~|~02/MPO~|~Work on High Street. MPO-STP funds. Funds needed over the cap will be provided by the City of Lima. The MPO-STP funds can be used for the Construction Contract and the Construction Engineering subphases. 112148~|~1~|~1~|~01/BRF~|~OPPP Funded items plan split 98323~|~1~|~1~|~01/STR~|~SCI 772 0.00 to 5.97PIK 772 0.00 to 2.04 116925~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing. 123456~|~1~|~1~|~01/STR~|~Resurfacing SR 644 120494~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing Municipal Bridge Federal Funds (4R87) at 100% up to Federal Maximum (CAP). 113107~|~1~|~4~|~04/S>2~|~Minor bridge rehab > 20' span. 113107~|~1~|~3~|~03/STR~|~Resurfacing. 113107~|~1~|~2~|~02/S>2~|~Resurfacing 113107~|~1~|~5~|~05/S>2~|~Minor bridge work 10' to 20' span and culvert work. 113107~|~1~|~1~|~01/NHS~|~Resurfacing. 119022~|~1~|~1~|~01/NFP~|~All work is in this split. 122170~|~1~|~1~|~01/SAF~|~All work included in this split. 107872~|~1~|~1~|~01/NHS~|~Reconstruction of pavement. 102482~|~1~|~1~|~01/STR~|~Resurfacing of SR 183 from SR 800 to SR 542 and SR 542 in Magnolia. 93247~|~1~|~1~|~01/MPO~|~Replacement of sidewalk and aprons. Treelawn area will be filled in with pavers to match previous pojects. Items will be added on the South side only. Decorative lights will be installed on both the North and South side of the street on West National Road from Long Street to Helke Road. 88992~|~1~|~1~|~01/NHS~|~reconstruction, widening, turnlanes on US 250 in Norwalk at Elm Street 88992~|~2~|~2~|~02/NHS~|~Added plan split for 100% local items and alternate bid items 120432~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State 105612~|~1~|~1~|~01/IMS~|~FAY-71 and associated bridges 105612~|~1~|~2~|~02/NHS~|~FAY-62 and associated bridges 87328~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 26 2.19-11.79. Rural other federal aid funded 80 federal/20 state. 87328~|~1~|~2~|~02/S<2~|~Two-lane resurfacing with an asphalt overlay, includes repairs. WAS 26 1.78-1.79. Federal aid route Urban, Federal 80%, Local 20% funds. 87328~|~1~|~3~|~03/S<2~|~Two-lane resurfacing with an asphalt overlay, includes repairs. WAS 26 1.79-2.19. Federal aid route Urban, Federal 80%, State 20% funds. 118780~|~1~|~1~|~01/STR~|~Slope repair 93993~|~1~|~1~|~01/BRF~|~Replace SFN 7032048 on CR 37 (Shauck Road) over the Cedar Fork, a branch of the Clear Fork - Mohican River 111326~|~1~|~1~|~01/MPO~|~Resurfacing of W Park Ave and E State St in the City of Niles. 121926~|~1~|~1~|~01/IMS~|~Plan split for roadway capacity improvements. Construction of a collector-distributor road that will separate traffic on EB I-275 from traffic traveling to the I-71 interchange. 121926~|~1~|~2~|~02/IMS~|~Plan split for bridge work. 93828~|~1~|~1~|~01/NFP~|~Paving at fairgrounds with 4CP7 funds 92613~|~2~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items 92613~|~1~|~1~|~01/MPO~|~Widening of Burbank Road in Wooster 103173~|~1~|~1~|~01/NHS~|~Replace conventional signalized intersection with a roundabout. 111271~|~1~|~1~|~01/NFA~|~ODNR Shawnee State Park. 88970~|~1~|~1~|~01/NHS~|~PIK 32 3.04-9.92 88970~|~1~|~3~|~03/SAE~|~Recessed-Wet Reflective Pavement Markings. 88970~|~1~|~2~|~02/NHS~|~Bridge preventative maintenance. 108254~|~1~|~1~|~01/CMQ~|~Realignment of Aicholtz Road from Eastgate Square Drive to connect with Glen Este Withamsville Road near Larma Lane. Construction of three roundabouts and cul-de-sac'ing of three local roads. 94558~|~1~|~1~|~01/BRO~|~Project will remove and replace the bridge deck, convert the abutment to semi-integral, pier patching and structural steep. Br. No. MOT 75-1582, SFN 5708796. 95797~|~1~|~1~|~01/NFP~|~from SLM .9 to SLM 1.06 and 2.17 to 5.83 122868~|~1~|~1~|~01/IMS~|~Pavement reconstruction. 123740~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal urban STP funds from SLM 28.30 to SLM 30.48. 123740~|~1~|~2~|~02/STR~|~80/20 fed/state funding split for all work using federal urban STP funds from SLM 28.30 to SLM 30.48. 94688~|~1~|~1~|~01/SAF~|~Install Roundabout at MED-094-11.91/Granger Road 112157~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%. 96767~|~1~|~1~|~01/SAF~|~Provide crossing improvements including improved crosswalk striping, updated ADA compliant curb ramps and signing at Intersections along the West Street and Center Street corridors. Install Rectangular Rapid Flashing Beacons at the existing crosswalk at Marker Road and the school drive. (SR 121) 110450~|~1~|~1~|~01/S<2~|~Resurfacing SR 267 110450~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 91455~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. HOC 56 9.44-13.60 and HOC 664 0.00-2.90. Rural other federal aid funded 80 federal/20 state. 113621~|~1~|~1~|~01/S<2~|~Landslide repair funded by OH20-01 ER funds. 93785~|~1~|~1~|~01/STR~|~Replace SFN 3600696Located 1.99 miles east of SR135 on US50. 80/20 Split01/STP/BR/State 101621~|~1~|~1~|~01/ENH~|~Work funded with federal funds through teh Transportation Alternatives Program. 95% federal funds using Toll Revenue Credit (TRC) with the 5% match provided by Wyandot County. Funds needed over the capped amount will be provided by Wyandot County. 124163~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance items. 119983~|~1~|~1~|~01/STR~|~Plan split for federally eligible costs associated with the design build team. 119983~|~1~|~2~|~02/STR~|~Plan split for locally funded Construction Engineering 115324~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 91573~|~1~|~1~|~01/STR~|~A FHWA Disaster OH11-02 flood project. DSR TUS-014: Encroachment slide with large amount of debris and shrubs - 100' wide. 114750~|~1~|~1~|~01/NHS~|~SCI Smoothseal 117045~|~1~|~1~|~01/STR~|~RIC SR 0095 5.087 to 11.247 Full Depth Reclamation 117045~|~1~|~2~|~02/BRO~|~Bridge repair. 91544~|~1~|~1~|~01/SAF~|~added left turn lanes WB and EB on 20 @ Lime City - WOO US20 4.71-5.11 98494~|~1~|~1~|~01/NHS/MASS~|~Resurfacing of STA SR 172 from 6.19 to 6.27 and 6.84 to 7.74 in the City of Massillon. 98494~|~1~|~2~|~02/NHS~|~Minor Bridge work to SFN 7600682 STA-SR 172-6.27 over Wheeling & Lake Erie RR, SR 21 and Tuscarawas River, SFN 7600755 STA-SR 172-7.55 over the Tuscarawas River. 124458~|~1~|~1~|~01/NFP~|~Created for TID Involvement. 96539~|~1~|~1~|~01/IMS~|~Generic Plan Split for interstate routes. Routes to be determined 119204~|~1~|~1~|~01/STR~|~All items of work associated with US62 and US22 in the STP Rural Area. 119204~|~1~|~2~|~02/S5K~|~All items of work assoicated with US62 and US22 within STP 5,000 to 49,999 Area. 119204~|~1~|~3~|~03/S5K/WCH~|~Urban Plan Split 119204~|~1~|~4~|~04/S5K/WCH~|~Work items to be paid 100% by City of Washington C.H. 113532~|~1~|~1~|~01/NFP~|~Created for TID involvement. 108939~|~1~|~1~|~01/NFA~|~Replace 200 foot long culvert 119753~|~1~|~1~|~01/SAF~|~Realignment of the intersection at Reading Rd (US42) & Summit Rd to remove slip lanes and shorten pedestrian crossings. Other associated work includes ADA curb ramps and a new traffic signal. 101983~|~1~|~1~|~01/NFP~|~Spot pavement repairs on various routes in Ashtabula, Mahoning, and Trumbull counties. 101983~|~1~|~2~|~02/NFP~|~See attached structures. 102489~|~1~|~1~|~01/IMS~|~Resurfacing of IR 70 102489~|~1~|~2~|~02/SAF~|~Wet Reflective Pavement Markings delta costs (Safety funds) 102489~|~1~|~3~|~03/NFP~|~Retroactive fuel price adjustment 124434~|~1~|~1~|~01/NHS~|~Realign the intersection of PIC US 23 and CR 16/TR 802 96339~|~1~|~1~|~01/NFA~|~Construction of a new sidewalk on the east side of Wolfangel Road from Beechmont Avenue to State Road in Anderson Township. 121416~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SEN-18 109163~|~1~|~1~|~01/S<2~|~ERI-113-5.85 Slope requires periodic regrading/ berming work and monitoring. 120927~|~1~|~1~|~01/IMS~|~Highway Lighting. 95768~|~1~|~1~|~01/MPO~|~Resurfacing of County Route 506 (Fifth Avenue) from the Madison Avenue Freeway to Gypsy Lane, in the City of Youngstown, Mahoning County, Ohio. 87674~|~1~|~1~|~01/NHS~|~Culvert Replacement at ASD-250-19.16. Filling and plugging the existing 6'x3' culvert and constructing a new drainage channel. 112917~|~1~|~1~|~01/STR~|~ROS 772 6.31-10.30 112917~|~1~|~2~|~02/STR~|~Bridge maintenance. 101054~|~1~|~2~|~02/S<2~|~Microsurface various routes within Logan County: LOG SR 117 SLM 0.00 to 1.54 = = LOG SR 117 SLM 1.54 to 2.01 = = LOG SR 366 SLM 6.03 to 7.24 = = LOG SR 368 SLM 0.00 to 2.59 101054~|~1~|~1~|~01/STR~|~Microsurface various routeswithin Logan County: LOG SR 117 SLM 2.01 to 3.29 = = LOG SR 117 SLM 3.29 to 5.83 = = LOG SR 366 SLM 7.24 to 9.78 102230~|~1~|~1~|~01/NFA~|~This plan split is for work in the Metro Park. 104154~|~1~|~1~|~01/S<2~|~LAW 7 3.89 Slide Repair. 112544~|~1~|~1~|~01/NHS~|~District wide bridge deck sealing project. 84881~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" - Farifield County Bridge replace on CR78 (Landis Rd) over Clear Creek. CAP CEAO funding cap of $968,810 at 95% using Credit Bridge with a CAP of $124,350 114705~|~1~|~1~|~01/NFP~|~Overlay on 123. 114705~|~1~|~2~|~02/STR~|~Overlay on 123 114705~|~1~|~3~|~03/STR~|~Bridge PM 94631~|~1~|~1~|~01/S<2~|~Districtwide maintenance throughout the District. 10374~|~1~|~1~|~01/STR~|~Brdg Replacement. Eligible for BR funds to rehab but not replace. 4401956 LAW SR93 21.32 Intersect: Olive Creek 80 Fed/20 State01/STR/BR/State 110039~|~1~|~1~|~01/NHS~|~Plan split for resurfacing outside of Fremont Corp. Limits (SLM 11.77 to 12.826) 110039~|~1~|~3~|~03/NHS~|~Plan Split for 100% Locally funded scope items within Fremont corp limit, including full depth repairs, upgrading loop detectors to radar within City limits, and overlay or resurfacing of Rawson Ave past limits of SR-53. 110039~|~1~|~2~|~02/NHS~|~Plan split for Urban paving section inside Fremont Corp. limit (SLM 10.45 to 11.77) 110052~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 56 10.08. 100% State ER funds. 99606~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 116564~|~1~|~1~|~01/STR~|~Plan Split for the bridge work 85065~|~1~|~1~|~01/BRF~|~bridge replacement 86949~|~1~|~4~|~04/S>2~|~Resurfacing of State Route 289 from SLM 2.17 to SLM 3.71, in the City of Youngstown, Mahoning County, Ohio. 86949~|~1~|~6~|~06/NHS/Ytwn~|~100% City of Youngstown items, including partial and full depth pavement repairs, adjusting manholes to grade. 86949~|~1~|~3~|~03/NHS~|~Bridge rehabilitation of SFN# 5005132, MAH-US422-1.86 under MAH-US422-1.90, in the City of Youngstown, Mahoning County, Ohio. 86949~|~1~|~2~|~02/NHS~|~Resurfacing of US-422 from SLM 0.00 to SLM 1.90, in the City of Youngstown, Mahoning County, Ohio. 86949~|~1~|~5~|~05/BRO~|~Bridge rehabilitation of SFN# 5009472, MAH-US62-18.60 over SR7, in the City of Youngstown, Mahoning County, Ohio. 86949~|~1~|~1~|~01/S>2~|~Bridge rehabilitation of SFN# 5004950, MAH-SR289-2.68 over Dry Run, in the City of Youngstown, Mahoning County, Ohio. 111892~|~1~|~1~|~01/STR~|~Slide repair work on US 127. Funds by the Geologic Site Management Program with overage funded by the District. 111892~|~1~|~2~|~02/NHS~|~Slide repair work on US 24. Funds by the Geologic Site Management Program with overage funded by the District. 105821~|~1~|~1~|~01/NHS~|~Plan split for culvert work on the NHS 98706~|~1~|~1~|~01/SAE~|~Various county roads 112967~|~1~|~1~|~01/NFA~|~Replace bridge 124865~|~1~|~1~|~01/NHS~|~Traffic signal upgrades/repairs throughout the district. 95500~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 25161~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation Funding - No CAP's - Resurfacing - Lic-SR 16-14.10 to 19.68; Lic-SR 37-15.52 to 16.21 - Treatment = Milling off existing surface (1 1/2"-2"), 5 % repairs, resurfacing with 1 3/4" Item 442 Intermediate Course and 1 1/2" Item 442 Surface Course. 88519~|~1~|~2~|~02/STR~|~SEN -12-12.73 Bridge, SFN 7400330 88519~|~1~|~1~|~01/STR~|~SAN SR12 0.00 -3.92 SEN SR12 12.01-13.09 110921~|~1~|~1~|~01/BRF/KCEO~|~Knox County CEAO Bridge Replacement Project (Bridge Formula Project) - 4B87 (Federal 100%) - See Cap Comments - Bridge Replacement on KNO-TR112-0.36 120760~|~1~|~1~|~01/S5K~|~Pavement rehabilitation along Fairfield Avenue utilizing Small City (4B97) Federal funds at 95% up to CAP. 112888~|~1~|~1~|~01/SAF~|~Safety intersection improvement project. WAS 60 20.40-20.48/Ferry Street includes a signal replacement/upgrade.WAS 60 20.22-20.30/Center Street includes a signal removal and ped improvements. WAS 60 20.13/McIntosh Street and WAS 60 19.94/Ullman will get ped improvements. Funded 90 Federal Safety/10% State Safety. 112150~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - 100% State Funded (4PS7) - district wide mowing contract. 98110~|~1~|~1~|~01/STR~|~Resurfacing TUS-258 from GUE Co. Line to SR 342, including asphalt concrete overlay, pavement repairs and pavement markings. 89036~|~1~|~1~|~01/CMQ~|~local funds 115125~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. 115125~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 110600~|~1~|~2~|~02/IMS~|~Split for guardrail work 110600~|~1~|~1~|~01/NFP~|~Split for ding & dent work 102278~|~1~|~1~|~01/SAE~|~Various county roads. 107553~|~1~|~1~|~01/NFP~|~District guardrail 98201~|~1~|~1~|~01/IMS~|~District Preservation Culvert Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Culvert repairs along GUE IR 77; GUE IR 70; MUS IR 70; LIC IR 70; 98201~|~1~|~2~|~02/STR~|~District Preservation Culvert Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Culvert replacement on: 1) MUS SR 93 2.90 113981~|~1~|~2~|~02/STR~|~Full depth replacement of pavement on: CLI-350 SLM 7.91 to 15.85 113981~|~1~|~1~|~01/STR~|~Plan Split for the resurfacing work on western portion of CLI-350 95943~|~1~|~1~|~01/NFA~|~CNG Refuse Trucks 107121~|~1~|~1~|~01/STR~|~Resurface with fine graded polymer modified asphalt concrete on CLA SR 369 SLM 0.00 to 1.45. 121723~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs WAY-226-7.751 to 9.306 including bridge maintenance 121723~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs WAY-226-0.905 to 7.751 including bridge maintenance 121723~|~1~|~3~|~03/STR~|~Asphalt Concrete Overlay with Repairs WAY-226-1.814 to 2.972 - Local Funding 114532~|~1~|~1~|~01/MPO~|~Split for MPO funded eligible resurfacing work. 114532~|~1~|~2~|~02/MPO~|~Plan split for TLCI funded eligible items such as mini-roundabouts/crosswalks, pavements markings, delineators, crosswalks, RRFB, curbs and traffic calming measures. 114532~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 97093~|~1~|~1~|~01/IMS~|~Emergency maintenance project to repair damaged median barrier wall on IR75 SLM 2.47 to 2.51. 107221~|~1~|~1~|~01/NFA~|~The City will construct a 1300 linear foot northbound left turn lane on SR 43 115914~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - 90% Federal (4PF7) and 10% State (4PS7) - rehabilitation of LIC IR 70 23.20 (SFN 4504178). 112570~|~1~|~1~|~01/NFP~|~Signing plans split 92273~|~1~|~1~|~01/SAE~|~Erect new guardrail and replace substandard guardrail on various county routes in Clinton County. 98392~|~1~|~1~|~01/NHS~|~Resurfacing STA SR 44 from 14.67 to 16.46. 98392~|~1~|~3~|~03/S<2~|~Resurfacing STA SR 173 4.43 to 4.60. 98392~|~1~|~4~|~04/NHS~|~See linked structures >20' span. 98392~|~1~|~6~|~06/STR~|~See linked structure 10' to 20' span. 98392~|~1~|~5~|~05/STR~|~See linked structures > 20' span. 98392~|~1~|~2~|~02/STR~|~Resurfacing STA SR 44 16.46 to 19.39 and STA SR 173 0.00 to 4.43. 98392~|~1~|~8~|~08/S>2/LOU2~|~100% City of Louisville items. 98392~|~1~|~7~|~07/S>2/LOU1~|~Resurfacing of STA SR153 from SLM 6.25 to SLM 7.47 in the City of Louisville, Stark County, Ohio. 113211~|~1~|~1~|~01/S<2~|~LAW SR 7 2.17 Phase 2B 113211~|~1~|~2~|~02/S<2~|~LAW SR 7 2.17 Phase 2B 118909~|~1~|~1~|~01/IMS~|~Resurfacing IR 70 123922~|~1~|~1~|~01/NFP~|~Bridge pier encasement 97035~|~1~|~1~|~01/NFP~|~Guardrail at various locations in District 11. 105296~|~1~|~1~|~01/STR~|~Guardrail replacement at various location within District 11 105296~|~1~|~2~|~02/STR~|~Guardrail replacement in Belmont County municipalities. 120396~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 95966~|~1~|~1~|~01/NFP~|~Look at hooking up to Sanitary- 2 to 3 miles- force main? 90310~|~1~|~1~|~01/S>2/Barb~|~Safety and congestion upgrade. Widening SB SR-619 at ramp E/F. Intersection to provide SB left turn lane. Introduce a continuous RT lane on ramp D. Includes intersection improvement at Wooster Avenue/East Avenue and Kenmore Boulevard, in the City of Barberton, Summit County, Ohio. 118786~|~1~|~1~|~01/IMS~|~Microsurfacing. 116483~|~1~|~1~|~01/STR~|~Culvert Replacement 116483~|~1~|~2~|~02/NFA~|~Culvert Replacement 100551~|~1~|~1~|~01/NHS~|~LAW 52 Bench Cleaning 121148~|~1~|~1~|~01/S>2/MACE~|~Deck overlay. 95452~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation. 110446~|~1~|~1~|~01/SAF~|~Reconstruct intersection of DEL SR 315 and Jewett Rd 103595~|~1~|~1~|~01/STR~|~Emergency project to repair a landslide. GAL CR 3 6.95 Bulaville Pike. DSR GAL-003. 113057~|~1~|~1~|~01/NFP~|~All work is in this plan split using 100% state funds from SAC 4PS7, district preservation funds. 100786~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on rural route: MIS SR 202 SLM 0.86 to 5.06. 100786~|~1~|~2~|~02/S>2~|~Fine graded polymer AC overlay on Lg. urban route: MIA SR 202 SLM 0.16 to 0.86. (Split corp with Huber Heights) 100786~|~1~|~3~|~03/S>2~|~Fine graded polymer AC overlay on urban route: MIA SR 202 0.16 to 0.44 in the City of Huber Heights. 121271~|~1~|~1~|~01/STR~|~All Work with be within this split 123873~|~1~|~1~|~01/S>2~|~Roadway widening & pedestrian/bike improvements 110391~|~1~|~2~|~02/S>2~|~Microsurfacing 110391~|~1~|~1~|~01/STR~|~Microsurface existing pavement 99962~|~1~|~1~|~01/NHS~|~Erosion of the embankment toe by the Ohio River has caused distress to guardrail and pavement shoulder on the south side of US 52 at Asbury Road. Project will install a soldier pile wall to re-establish the roadway should and protect from future distress. 87005~|~1~|~1~|~01/NHS~|~1/NHS/PV/ This split is for the roadway work along both I-75 and US 68. Work on the ramps is included in this split. Work to replace or reconstruct bridges will be in another split. A category of NHS instead of Interstate is being used for the I-75 work because capacity is being added. This split will cover all the roadway work on US 68 but only the add capacity roadway work on I-75. 87005~|~1~|~3~|~03/IMS~|~3/IMS/PV/ The split is for the roadway work along I-75 that is the non-added capacity portion of the Interstate work. Funding for this split will be 90% IM funds and 10% state funds. 87005~|~1~|~2~|~02/NHS~|~2/NHS/BR/ This split is for work to replace bridges. The work in this split is not eligible for BR funds. 87005~|~1~|~4~|~04/NHS~|~This split is for work to construct new bridges where there are not currently bridges. 107746~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads. 106824~|~1~|~1~|~01/NFP~|~Install approximately 30 CCTV cameras at various locations statewide (Locations to be determined) 120279~|~1~|~1~|~01/S>2~|~Install sidewalks along Smith Rd. 100797~|~1~|~1~|~01/IMS~|~Build temporary cross over 101880~|~1~|~1~|~01/NFA~|~Guardrail replacement on various CR in Scioto County. 116803~|~1~|~1~|~01/S5K~|~This plan split is for the work to be perform on COL 14T (0.00-1.82) and COL 62 (13.01-14.12) 116803~|~1~|~3~|~03/STR~|~This plan split is for the work to be perform on MAH 14T (0.00-0.91) 116803~|~1~|~2~|~02/NHS~|~This plan split is for the work to be perform on COL 30 (34.40-35.91), COL 39 (19.91-20.70) and JEF 7 (14.78-17.61). 106972~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - Resurfacing project in the City of Zanesville on CR 2003 from 0.00 to 1.20 using 4TA7 funds 119250~|~1~|~1~|~01/S5K~|~Resurfacing. 118855~|~1~|~1~|~01/STR~|~plan split. 113400~|~1~|~1~|~01/SAF~|~District Intersection Safety Improvement intersection improvement at SR 204 and Milnor Road. 97447~|~1~|~1~|~01/SAF~|~Construction of a roundabout at CR 10 (Bogart Road) and TR110/CR 110 (Campbell Street) in Erie County. 97447~|~1~|~2~|~02/SAF~|~Construction of a roundabout at CT 10 (Bogart Road) and TR 110/CR 110 (Campbell Street) in Erie CCounty 94134~|~1~|~2~|~02/NHS~|~Resurfacing MAH US 224 from 19.90 to 25.33 94134~|~1~|~7~|~07/S>2~|~See linked structure 10' to 20' span. 94134~|~1~|~9~|~09/STR~|~See linked structure > 20' span. 94134~|~1~|~1~|~01/IMS~|~See linked structure > 20' span. 94134~|~1~|~6~|~06/S>2/STRU~|~Resurfacing MAH SR 289 from 6.09 to 7.28 80/20 items in the City of Struthers. 94134~|~1~|~8~|~08/STR~|~Resurfacing MAH SR 626 from 0.00 to 1.05 and 1.47 to 2.26. 94134~|~1~|~3~|~03/NHS~|~Minor bridge rehab to linked structure>20' span. 94134~|~1~|~4~|~04/NHS~|~See linked structures 10' to 20' span. 94134~|~1~|~5~|~05/S>2~|~Resurfacing MAH SR 626 from 2.26 to 3.24. 97244~|~1~|~1~|~01/STR~|~PIK SR 124 7.04 110531~|~1~|~1~|~01/STR~|~plan split for the resurfacing in the rural section:CLE-50: SLM 7.68-9.67 110531~|~1~|~2~|~02/S>2~|~plan split for resurfacing in the large urban section:CLE-50: SLM 9.67-11.49 119182~|~1~|~1~|~01/BRO~|~Plan split for bridge work 97270~|~1~|~1~|~01/NFA~|~Resurfacing Clarence Darrow Parking Lot and service entrance. 107295~|~1~|~1~|~01/CMQ~|~Construction of a new segment of the Little Miami Scenic Trail from the existing trail along SR-32 north of Beechmont Avenue, under the existing interchange of SR-32 with Beechmont Avenue, and across the Little Miami River to connect with the Lunken Trail, using the existing Beechmont Avenue bridge. 107295~|~2~|~2~|~02/NHS~|~Paint and replace the bearings on bridge HAM-32-1.44R bridge at the SR 32/125 interchange (Beechmont Ave / Batavia Rd.) 107295~|~1~|~3~|~03/NFP~|~Plan split for GCWW improvements being constructed as part of this contract but at 100% GCWW cost. 107295~|~1~|~4~|~04/NHS~|~This split covers work necessary for addressing flooding issues in the infield of the EB SR-125 ramp to SR-32. The work includes adding a treatment to an existing culvert and grading work. 107295~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 97278~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2018 122418~|~1~|~1~|~01/S>2~|~Plan split for work traffic signal repair, replacement and/or upgrade 90457~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay project on WAS 50 0404 (SFN 8401357), WAS 50 0489 L (SFN 8401381) & R (SFN 8401411). NHS route funded 80 federal/20 state. 90457~|~1~|~2~|~02/IMS~|~Concrete bridge deck overlay on NOB 77 0362 L (SFN 6100279). Interstate route funded 90 federal/10 state. 105806~|~1~|~1~|~01/MPO~|~STBG funded items 111949~|~1~|~1~|~01/S<2~|~2" Mill and Fill in the City of Urbana. 91678~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 143 8.20-8.25. Not on any federal aid system funded 100% state. 91678~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 124 0.00-0.90, MEG 124 62.33-66.97, and MEG 143 0.00-8.20. Rural other federal aid funded 80 federal/20 state. 95581~|~1~|~1~|~01/STR~|~Bridge Replacement - WAY-094-16.74 108257~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER Event. 87391~|~1~|~1~|~01/STR~|~ADA SR125 13.26 Slide Repair On SR125, 3.12 miles east of the West Union corp limit (13.26 to 13.36), it is proposed to rebuild & stablize an existing slope to stop vertical and horizontal movement.80 Fed/20 State 01/STR/OT/State 94078~|~1~|~1~|~01/IMS~|~100% state plan split for all work on this project. 93543~|~1~|~1~|~01/SAF~|~Access management and signal installation from the Aldi's Drive (SLM 13.45 to Cazadores restaurant drive (SLM 13.69) on SR 47 in Sidney. 124644~|~1~|~1~|~01/SAE~|~Install new and upgrade existing guardrail on various Pickaway County roads. 114637~|~1~|~1~|~01/STR~|~Overlay on SCI 776 95455~|~1~|~2~|~02/NFA/ODNR~|~Parks - ODNR Funding - 4BF7 (100% State) No CAP - Resurfacing work at the Hebron Fish Hatchery 95455~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 7BPB/4PS7(20% State) - See CAP Comments - Resurfacing on Lic-USR 40-19.59 to 30.14 95455~|~1~|~3~|~03/STR~|~Distric Preservation 4PF7 (80% FEDERAL) / 4PS7 (20% STATE) - NO CAP - Sidewalk work in Brownsville 109444~|~1~|~1~|~01/NFA~|~Culvert repair project. WAS 260 4.46, 100% State funds. 107427~|~1~|~1~|~01/STR~|~AC Overlay 118466~|~1~|~1~|~01/BRF~|~Replace SFN 4960122 77009~|~1~|~1~|~01/STR~|~The project has progressed to the design and construction phase of it's development. PE determined that a signal is warranted along with left turn lanes on each approach, however a roundabout alternative is being considered. The district has set aside a portion of it's system preservation funds (4PF7 & 4PS7) to construction this project. 97043~|~1~|~1~|~01/S>2~|~STP > 200,000 Smoothseal: MED 162 SLM 15.27-16.62, 17.11-19.61 97043~|~1~|~2~|~02/STR~|~STP Rural: MED 162 SLM 12.90-15.27, 19.61-24.08 (smoothseal), 24.16-26.74 (chip seal) 97043~|~1~|~3~|~03/STR~|~SR94 Approach using Verglimit Asphalt: MED-94-7.75 to 7.90 103682~|~1~|~1~|~01/STR~|~Landslide repair on DSR ATH-007. ER funds are 80% and 20% local. ATH CR 20 5.27-5.29. 98299~|~1~|~1~|~01/MPO~|~MIll & fill Lake Ave from Griswold Rd to Elyria Ave. 124074~|~1~|~1~|~01/STR~|~Superstructure Replacement (SFN: 8200505) 101546~|~1~|~1~|~01/STR~|~Landslide repair, MOE 536 7.20. 100% Federal funded. DSR MOE-005. 77563~|~1~|~2~|~02/SAE~|~Replacement and upgrade of various signals on US-20 in Ashtabula Township, Ohio. 77563~|~1~|~1~|~01/SAF~|~Widen for TWLTL from Ridgewood to Cook Road. ATB-US20, from SLM 14.28 to 14.68, in Ashtabula Township, Ohio. 77563~|~1~|~3~|~03/S<2~|~Resurfacing and drainage improvements through section of ATB-US20, from SLM 13.78 to SLM 14.68, in Ashtabula Township, Ohio. 122719~|~1~|~1~|~01/S>2~|~Plan Split for MPO STBG funded scope. 122719~|~1~|~2~|~02/NFP~|~Funding split for 100% locally funded scope. 109058~|~1~|~2~|~02/STR~|~Traffic signal replacement rural location (LOR-57) 109058~|~1~|~1~|~01/S50~|~Traffic Signal Replacement (RIC 42). 109058~|~1~|~3~|~03/S5K~|~Traffic Signal Replacement (LOR SR 113). 88326~|~1~|~1~|~01/CMQ~|~"01/CMQ/OT/BEL" - Intersection improvement at the intersection of Mall and Banfiled Roads; replace existing traffic signal, including loop detection, pedestrian pushbutton installation, signing and pavement markings. 107229~|~1~|~1~|~01/IMS~|~Guardrail upgrade work 107229~|~1~|~2~|~02/NFP~|~Split for guardrail repair 100817~|~1~|~1~|~01/NHS~|~Double Microsurfacing to TRU SR 45 from 9.87 to 10.66.Microsurfacing to TRU SR 45 from 9.17 to 9.87 and 11.65 to 12.90. 119146~|~1~|~1~|~01/NFP/Mans~|~Connection of existing Bike and Ped infrastructure 84550~|~1~|~2~|~02/NFP~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 26 17.06-17.91. Non-Federal Aid route, 100% State funded. 84550~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 26 16.33-17.06. STP Rural, Federal 80% and State 20%. 97219~|~1~|~1~|~01/IMS~|~Plan split for all work on the interstate system. 80964~|~1~|~1~|~01/ERD~|~All work eligible to be funded with this congressional earmark. 80964~|~1~|~2~|~02/CMQ~|~MPO CMAQ funding using an 80% federal / 20% local funding split. 99488~|~1~|~1~|~01/SAE~|~Guardrail replacement 108036~|~1~|~1~|~01/STR~|~Bridge Rehab. 121609~|~1~|~1~|~01/BRF~|~Bridge rehab (deck replacement) major bridge funded FY2027 121609~|~1~|~2~|~02/BRF/Nor~|~On-Going Services 96821~|~1~|~1~|~01/NHS~|~Priority System resurfacing of COL-11 from SLM 16.01 to SLM 22.69 including pavement repairs and pavement markings. 115625~|~1~|~1~|~01/IMS~|~MOWING 96563~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay of SUM SR 303 from 5.49 to 8.94 96563~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay of SUM SR 303 from 8.94 to 10.54 96563~|~1~|~3~|~03/STR~|~Minor bridge work to SFN 7709935 SUM 303 7.22 over Cuyahoga River. 114955~|~1~|~1~|~01/IMS~|~Place epoxy wearing surface on bridge deck. 123160~|~1~|~1~|~01/NHS~|~Resurface with asphalt concrete 124216~|~1~|~1~|~01/S>2~|~Resurfacing Non-NHS Portion, LOR SR 611 9.960 -11.183. 124216~|~1~|~3~|~03/NFP~|~Pavement repairs and other 100% city items. 124216~|~1~|~4~|~04/SAF~|~Guardrail items. 124216~|~1~|~2~|~02/NHS~|~Concrete patching, NHS Portion, LOR-SR-611 9.107 - 9.960 122314~|~1~|~1~|~01/SAE~|~Plan Split for cable barrier and end treatment upgrades 116844~|~1~|~1~|~01/ENH~|~Constructing new sidewalk. 103973~|~1~|~1~|~01/SAE~|~Installation of pavement markings on various county roads in Preble County. 110686~|~1~|~1~|~01/S<2~|~Construction Inspection 110686~|~1~|~3~|~03/S50~|~Construction Inspection 110686~|~1~|~2~|~02/S50~|~Construction Inspection 84263~|~1~|~1~|~01/NFA~|~Replace superstructure and pier caps (COL-558-0512, SFN 1505610). Convert to semi-integral and rehab abutments and backwalls. The bridge will also be raised to meet current standards. 96097~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge replacement on 3005100 GUE-SR 285-4.37 Intersect: Over Tabitha Creek; Not BR Eligible: Length=17 SD/FO(0) SR=55.5 DSR=6 104652~|~1~|~1~|~01/MPO~|~Resurfacing and installing landscaped median along Front St between Marshall St and South Ave. 102975~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs on HUR-547-0.00 to 7.13 101559~|~1~|~1~|~01/S>2~|~Repair significant drainage issue on the MAH-62-14.68 structure over Mill Creek in Youngstown. Includes slope repair and protection. 91779~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment with repair. MOE 536 2.49-12.63. Rural other federal aid funded 80% Federal and 20% State. 91779~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment with repair. MOE 536 0.69-2.49. Urban other federal aid funded 80 federal/20 state. 116329~|~1~|~1~|~01/NHS~|~Plan split for the NHS sections 82964~|~1~|~1~|~01/NHS~|~Plane and pave a portion of SR 126 in Hamilton County between US 27 and Galbraith: SLM 6.83 and SLM 11.35. This portion of SR 126 is a NHS route. 96976~|~1~|~2~|~02/STR~|~STA-SR 153-7.81 to 9.87 and STA-SR 173-1.85 to 4.26 96976~|~1~|~1~|~01/NHS~|~STA US 62T from 0.02 to 4.67 and STA-SR 153-7.47 to 7.80 80620~|~1~|~1~|~01/ERD~|~Truck Route thru Orrville 113129~|~1~|~1~|~01/NHS~|~JAC 32 6.4-10.01 120458~|~1~|~1~|~01/IMS~|~Repair bridge by replacing the existing wearing surface with a new rigid overlay. 86996~|~1~|~4~|~04/BRO/AT&T~|~Plan Split covering AT&T utility work. 86996~|~1~|~3~|~03/BRO/DEOG~|~Plan Split for DEOG utility work. 86996~|~1~|~2~|~02/BRO/AKRN~|~Plan Split for SFN 7760043 Brittian Road Bridge over W&LE RR 86996~|~1~|~1~|~01/NHS~|~Plan Split for SFN 7708165 SUM SR 18 13.02 under Brittian Rd 101908~|~1~|~1~|~01/NFA~|~Drainage improvements along North Main Street in Windham Ohio. 121099~|~1~|~1~|~01/IMS~|~Construction 115601~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 106081~|~1~|~2~|~02/NHS~|~NHS Plan Split: FRA-161-7.11-7.35, 7.38-7.48, 7.52-7.62, 7.64-7.76, 7.92-8.67 106081~|~1~|~3~|~03/NHS~|~100% City of Columbus items for repair, curb work, etc. 106081~|~1~|~1~|~01/NHS~|~Urban Paving Plan Split: FRA-161-5.77-7.11, 7.35-7.38, 7.48-7.52, 7.62-7.64, 7.76-7.92, 10.58-10.79 106081~|~1~|~4~|~04/NHS~|~Extra cost of special tack coat to be paid by the City of Columbus 106081~|~1~|~5~|~05/NHS~|~City of Dublin Urban Paving Plan Split: FRA-161-4.75-5.77 106081~|~1~|~6~|~06/NHS~|~Items to be paid 100% by the City of Dublin 95308~|~1~|~2~|~02/S<2~|~CR-41 from SLM 13.22 to 14.14 95308~|~1~|~1~|~01/STR~|~CR-41 from SLM 0.00 to 13.22 (Rural) 99194~|~1~|~1~|~01/NFA~|~Pike County Various Routes Guardrail. 99568~|~1~|~2~|~02/STR~|~This split is for the piece that is not on the NHS system. 99568~|~1~|~1~|~01/NHS~|~This is for the NHS piece of SR-15 94288~|~1~|~1~|~01/SAF~|~Project consists of widening Liberty Fairfield Road to provide a center turn lane from the southbound left turn lane at Millikin Road to Randall Drive 94288~|~1~|~2~|~02/SAF~|~Watermain upgrades being performed as part of the project, at 100% Butler County Water & Sewer cost. 123624~|~1~|~1~|~01/STR~|~Plan Split for STP Rural 117403~|~1~|~1~|~01/STR~|~Plan split for Construction & CE 123948~|~1~|~1~|~01/NHS~|~Resurfacing 106203~|~1~|~1~|~01/IMS~|~Lighting improvements to the following interchanges...MAH IR 680/SR 711, TRU SR 5/82/W Market St and TRU SR 82/E Market St. 123093~|~1~|~1~|~01/BRO~|~Plan split to program project, update during scoping. 97085~|~1~|~1~|~01/S<2~|~4.69 - 5.24 Resurfacing Project 97085~|~1~|~2~|~02/STR~|~5.24 - 10.93 Resurfacing Project 97085~|~1~|~3~|~03/STR~|~SR 159 95673~|~1~|~1~|~01/CMQ~|~Intersection of Douglas and Dorr St 89125~|~1~|~1~|~01/SAF~|~Install new guardrail, upgrading existing guardrail and end treatments in various locations in Logan County. LOG CR 30 0.00 to 0.25. 112984~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs using Indefinite Delivery Indefinite Quantity (IDIQ) construction project format. 115827~|~1~|~1~|~01/MPO~|~Safe Routes to School items. 98153~|~1~|~1~|~01/S<2~|~JAC 349 0.00 to 1.0980/20 local match 98153~|~1~|~2~|~02/STR~|~JAC 327 11.62 - 21.24 98153~|~1~|~3~|~03/S<2~|~JAC 349 0.49 4003837JAC 349 0.98 4003861 98153~|~1~|~4~|~04/STR~|~JAC 327 16.00 4003640JAC 327 17.49 4003675JAC 327 18.19 4003683 102060~|~1~|~1~|~01/NHS~|~This is for NHS add turn lanes. 86643~|~1~|~1~|~01/STR~|~Federal/State D6 funding for resurfacing outside of City and outside of urbanized area. SLM 0.00-1.34, 1.63-3.84 86643~|~1~|~2~|~02/S>2~|~Federal/State D6 funding for resurfacing outside of city but inside of Columbus urbanized area. SLM 3.84-5.63, 8.07-8.54 86643~|~1~|~4~|~04/S>2/GROV~|~100% local Grove City funding for pavement repair within Grove City, SLM 5.63-8.07 86643~|~1~|~3~|~03/S>2~|~D6 federal/local funding for resurfacing inside Columbus urbanized area and inside Grove City. SLM 5.63-8.07 93831~|~1~|~1~|~01/NFP~|~Asphalt repair/ Resurfacing and culvert replacement of Pater Lake Wildlife area in Butler County and also Rush Run Wildlife area in Preble County. 109675~|~1~|~1~|~01/STR~|~Resurfacing BEL-9 112803~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-423-0.04-4.28 & MAR-231-0.02-1.07 112803~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: MAR-423-4.28-7.29 96336~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation Bridge Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge Rehabilitation BR Eligible: SFN 6006183 - MUS SR555 06.68 - L=113; SD/FO = (1); DSR = 7; SR = 49.6 109364~|~1~|~1~|~01/SAF~|~Add left turn lane to the south bound traffic on SR 73 at the intersection of County Road 12 Antioch Road. Begin widening along East side of SR 73, 800 feet north of the intersection to provide width for turning lane and transition back to existing width 600 feet south of the intersection. All work done within existing Right-of-way 109364~|~1~|~2~|~02/STR~|~Split covers resurfacing of SR 73 from SLM 14.64 to SLM 14.91 using district preservation funding. 121038~|~1~|~1~|~01/BRF/HUR~|~Replacement of SFN 3948798 101289~|~1~|~1~|~01/NHS~|~WOO-795 from SLM 2.129 to 2.297 101289~|~1~|~2~|~02/S>2~|~WOO-795 from SLM 0.75 to 2.129 101678~|~1~|~1~|~01/STR~|~MRW US 42 fine graded polymer AC overlay from 0.00 to 12.71 101678~|~1~|~2~|~02/STR~|~Work on MRW-42-2.99 (SFN 5900492) and MRW-42-7.71 (SFN 5900530) 110448~|~1~|~1~|~01/SAF~|~Improvements at the intersection of MAR SR 423 and Barks Rd 110448~|~1~|~2~|~02/S5K~|~City of Marion urban paving plan split for all items related to resurfacing for the roadway segment linked to this split. 113733~|~1~|~2~|~02/NFA/STRE~|~Culvert replacement, project eligible. 113733~|~1~|~1~|~01/SAF~|~Construction of a southbound climbing lane on POR SR 14 between Price Rd and Lake Rockwell Rd. Includes centerline rumble stripping for two lane portion. 119047~|~1~|~1~|~01/STR~|~Rural plan split for culvert rehab and storm sewer upgrades on MAR-746. 88855~|~1~|~1~|~01/STR~|~District Allocation 117348~|~1~|~1~|~01/BRF~|~Bridge Rehabilitation. All work in this plan split. 94373~|~1~|~1~|~01/ENH/MCMP~|~Enhancements to Slippery Rock Bridge in Mill Creek MetroPark, Mahoning County, Ohio. 119177~|~1~|~1~|~01/SAF~|~Plan split for traffic signal work 97715~|~1~|~1~|~01/STR~|~Replace MAR-423-2.14 culvert over Myers Ditch 107907~|~1~|~1~|~01/MPO~|~Roadway milling and resurfacing. 107907~|~1~|~2~|~02/S>2~|~Isolated repair of concrete curb, median and drive approaches. 120533~|~1~|~1~|~01/S50~|~All work included in this split. 90572~|~1~|~1~|~01/STR~|~100% State funds (4MP7) for district rpm replacement 97109~|~1~|~1~|~01/BRF~|~The replacement of SFN# 3633683 91766~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 7 22.73-28.55. NHS route funded 80 federal/20 state. 94418~|~1~|~1~|~01/NFA~|~Two Lane Resurfacing 112278~|~1~|~1~|~01/S<2~|~Bridge concrete overlay project. HOC CR 418 0.06, SFN 3703909. 107132~|~1~|~1~|~01/SAF~|~BRO 41 3.34-3.60 Safety Section Improvement. 111168~|~1~|~1~|~01/NFA~|~ODNR Scioto State Forest. 114634~|~1~|~1~|~01/STR~|~Overlay on SCI 335 117177~|~1~|~1~|~01/STR~|~Split for resurfacing work 99603~|~1~|~1~|~01/BRO~|~Rehabilitate bridge TUS 416 1483 (SFN 7906129) by replacing deck and converting to semi-integral abutments. 122914~|~1~|~1~|~01/SAE~|~Convert existing signalized intersection of CR 16 (Havens Corners Rd) and CR 106 (Waggoner Road) to a roundabout. 108040~|~1~|~1~|~01/STR~|~Box Beam ReplacementMED-US-42 09.440 SFN 5201454 ) OVER CAMEL CREEK) New Construction ? Superstr repl (003) 104479~|~1~|~1~|~01/MPO~|~plan split 123809~|~1~|~1~|~01/STR~|~stp rural 123809~|~1~|~2~|~02/S5K~|~stp 5k-50k 97001~|~1~|~2~|~02/NFP~|~Construction of stone veneer on a large culvert headwall on HOC 374 0443 (SFN 3726134) that will be funded 100% by ODNR. 97001~|~1~|~1~|~01/ENH~|~Construction of stone veneer on large culvert headwalls on HOC 374 0443 (SFN 3703983 and SFN 3703975). Enhancement project funded 80 federal/20 state. 116448~|~1~|~1~|~01/NFP~|~Districtwide systematic lighting upgrades/maintenance. 120723~|~1~|~1~|~01/MPO/OKI~|~Realignment of the intersection of Northland Blvd and Kemper Rd and the construction of a SUP along Kemper Rd. 109453~|~1~|~1~|~01/NHS~|~See linked structures > 20' span. 114434~|~1~|~1~|~01/STR~|~Culvert replacement. 114725~|~1~|~1~|~01/SAF~|~District-wide fast drying pavement markers. 109906~|~1~|~1~|~01/STR~|~Landslide repair project NOB 285 4.50-4.55. 80% Federal ER and 20% State ER funds. 102834~|~1~|~1~|~01/STR~|~plan split for roadway work in the Rural sections 102834~|~1~|~2~|~02/STR~|~Funding event for the miscellaneous bridge work on the project. 98830~|~1~|~1~|~01/IMS~|~Split for interstate work 116798~|~1~|~1~|~01/IMS~|~MOWING 82260~|~1~|~1~|~01/S<2~|~Sign Replacement 109707~|~1~|~1~|~01/STR~|~Chip seal 95340~|~1~|~1~|~01/STR~|~Culvert ProjectO C 000 Other Federal-Aide Highway Major Collector RURAL ROS -SR -772 1.890 to 1.900 80/20 split 119639~|~1~|~1~|~01/NFA~|~Created for J&C involvement 117803~|~1~|~1~|~01/NFA/NALB~|~Plan Split 01/NFA/OT/NALB 99694~|~1~|~1~|~01/S>2~|~Resurfacing work funded with 80% federal and 20% state 114710~|~1~|~1~|~01/IMS~|~Woo-75-13.28 bridge plan split 85107~|~1~|~1~|~01/STR~|~generaly system resurfacing w/ repairs; CAR/HAS -212 104119~|~1~|~1~|~01/NHS~|~Bridge Replacement of SFN# 6700586, POR-SR14-6.24. 112729~|~1~|~1~|~01/NHS~|~PIC-361-1.12 - Convert to semi integral and paint steel 116295~|~1~|~1~|~01/STR~|~Overlay project. 107249~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span. 107249~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span. 107249~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 108994~|~1~|~1~|~01/IMS~|~Replace flap gate along Ramp P1 in the FRA 270/23 South interchange 105104~|~1~|~1~|~01/STR~|~Culvert replacement. 118970~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding. 117003~|~1~|~1~|~01/NFA~|~Created for J&C involvement 92873~|~1~|~1~|~01/S<2~|~Milling of existing roadway and resurface with asphalt concrete:MER-127 13.78 to 14.68 104135~|~1~|~1~|~01/NFP~|~Install CCTV at various interchanges throughout the state 93241~|~1~|~1~|~01/MPO~|~Landscaping and other aesthetic enhancements, continuing the concept plan that is already in place in the area. Byers Road from 1,200' North of Austin Boulevard to Old Byers Road. 111077~|~1~|~1~|~01/SAF~|~Improvements to the intersection of FRA-Reynoldsburg New Albany Rd at Havens Rd 93825~|~1~|~1~|~01/ENH~|~Provide improve pedestrian access along State Route 82, State Route 305, State Route 700 in Hiram Village by installing sidewalks. 113776~|~1~|~1~|~01/S>2/YOUN~|~Installing pedestrian lighting on the streets surrounding Taft Elementary School. 112230~|~1~|~1~|~01/NFA~|~D09 Deck Sealing Project FY2026 121429~|~1~|~1~|~01/IMS~|~Fending event for bridge work related to bridge WAR-75-0170 113976~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 54.43 (SFN 5301807). 105276~|~1~|~1~|~01/STR~|~Resurfacing SR 152 from SR 213 to the Empire WCL (SLM 25.85) 105276~|~1~|~2~|~02/S<2~|~Resurfacing SR 152 from the Empire WCL to SR 7 90941~|~1~|~1~|~01/S<2~|~District Allocation - 80/20 90941~|~1~|~3~|~03/S<2~|~Dominion East Ohio 90941~|~1~|~2~|~02/S<2~|~THIS WORK WILL BE FULLY REIMBURSED BY CENTURYLINK 123806~|~1~|~1~|~01/STR~|~stp rural 100290~|~1~|~1~|~01/IMS~|~Resurfacing and widening of Southbound and Northbound IR-77 ramps at SR-687, includes construction of a median wall and work to ramps H,N,O,P. 100290~|~1~|~2~|~02/S>2~|~Resurfacing of State Route 687 from SLM 5.27 to SLM 5.53. 100960~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay to TRU SR 193 from 12.31 to 14.91 and 17.78 to 22.85. 112678~|~1~|~1~|~01/S<2~|~Resurfacing SR 43 within the City of Steubenville. 112678~|~1~|~2~|~02/S<2~|~100% City items of work 92554~|~1~|~1~|~01/SAF~|~Reconfigure lanes on Inidan Ripple Road as they approach the ramps for IR675. Improve signal timing and phasing at the ramps. 92554~|~1~|~2~|~02/NHS~|~Removal and replacement of traffic signal controller units at 4 intersections along Indian Ripple Road, outside the scope of the originally approved safety funds. Improvements to be paid by City. 89456~|~1~|~1~|~01/BRO~|~Rehabilitation of Bridge SFN 7760329 Thornton Street Bridge over Railroads. 100485~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using a microsurfacing treatment on WAS 7 14.05-17.60. Work also includes a double microsurfacing on WAS 618 1.48-1.86. NHS route funded 80 federal/20 state. 100485~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a double microsurfacing treatment on WAS 618 1.86-3.22. Urban other federal aid funded 80 federal/20 state. 111558~|~1~|~1~|~01/BRF~|~Muni-Bridge funded items 88306~|~1~|~1~|~01/NHS~|~District Preservation (80% federal) / 4PS7 (20% state) - No cap - bridge number ALL-65-0660, SFN 0201340. 88306~|~1~|~2~|~02/BRO/LIMA~|~Work on the City of Lima Bridge on Pine Street. Funds from the Municipal Bridge Program. ODOT is utilizing Toll Credit (TRC) to provide 95% of the eligible costs up to the cap in federal funds. The 5% non-federal match and any funds needed after the cap is reached will be provided by the City of Lima. 89723~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for items of work eligible for multiple federa fund sources: 1) federal discretionary funding and 2) MPO enhancement funding. 89723~|~1~|~2~|~02/ENH~|~100% local funding for non-fed eligible work. 117892~|~1~|~1~|~01/NHS~|~Plan Split for lane reduction and shared-use path/sidewalk on NHS and NOACA funding. 117892~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost 111639~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 1.00. GSM funded. Rural other federal aid funded 80 Federal/20 State. 103100~|~1~|~1~|~01/S>2~|~Mill and resurfacing on County Route 97386~|~1~|~1~|~01/NFA~|~This project is for construction inspection in FY14 and FY15. 102448~|~1~|~1~|~01/NHS~|~Bridge Overlay JAC 35 26.06 4000757JAC 35 26.10 4000781 102044~|~1~|~1~|~01/NFA~|~The village of Fayette proposes to widen and rehabilitate 2,200 feet of County Road "S" to facilitate the growth of TRW Inc. 124602~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to upgrade guardrail on various county roads. 110164~|~1~|~1~|~01/ERD~|~Plan split 1 for original PID 110164 safety improvement work using federal discretionary 4D57 funds. 110164~|~1~|~4~|~04/STR~|~Split 4 for original PID 103884 for resurfacing SR-608 using federal and state system preservation funding. 110164~|~1~|~2~|~02/SAF~|~Plan split 2 for original PID 23733 for safety improvements using discretionary and safety funding. 110164~|~1~|~3~|~03/SAF~|~Plan split 3 for original PID 103884 for safety improvements using a combination of safety and animal drawn vehicle funding. 110164~|~1~|~5~|~05/BRO~|~Split for bridge widening work 110164~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 121535~|~1~|~2~|~02/STR~|~Bridge replacement. 121535~|~1~|~1~|~01/S5K~|~Bridge preventive maintenance. 109984~|~1~|~1~|~01/STR~|~Smoothseal HIG 134 0.00-5.25 and BRO 134 0.00-0.34 104854~|~1~|~1~|~01/STR~|~This split is for the rural portion of the route. 104854~|~1~|~2~|~02/NHS~|~This plan split is for the NHS portion of this route. 93958~|~1~|~1~|~01/NHS~|~Urban Paving eligible items from SLM 15.76 to SLM 16.61 93958~|~1~|~2~|~02/NFP~|~Non Urban Paving Eligible items from SLM 15.76 to SLM 16.61. 93958~|~2~|~3~|~03/ERD~|~Traffic median improvements 75483~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds 75483~|~1~|~2~|~02/IMS~|~Split for barrier repair work 97371~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 821 0212, SFN 6105319. Rural other federal aid funded 80 federal/20 state. 110576~|~1~|~1~|~01/STR~|~To replace 42" culvert running down embankment between 2 bridges HAM-275-3500L (3113604) and HAM-275-3500R (3113612) underneath ODNR bike path and outlets Little Miami River. 89604~|~1~|~1~|~01/SAF/DEF~|~Work eligible for the funding approved from the ODOT Safety Program. The non-federal funds will be provided by the City of Defiance. 89604~|~1~|~2~|~02/S<2/DEF~|~This is for Urban Paving costs. The 80% federal funds are from the District Preservation Program SAC 4PF7. The 20% match is provided by the City of Defiance SAC LNTP. 110737~|~1~|~1~|~01/SAE~|~Paving full Width 117352~|~1~|~1~|~01/BRF~|~Bridge Replacement 108794~|~1~|~1~|~01/S>2~|~Local Let Urban Paving Plan split 108794~|~1~|~2~|~02/S>2~|~Plan split for 100% City of Toledo items. Non-Urban paving items 115524~|~1~|~1~|~01/IMS~|~bridge split 82940~|~1~|~2~|~02/NHS~|~SFN 5000394 and SFN 5000424 SR 11 05.07 LR 82940~|~1~|~1~|~01/BRO~|~ SFN 5000270 and SFN 5000300 SR 11 01.92 LR 113934~|~1~|~1~|~01/SAF~|~Pedestrian improvement on ATH 13 11.33-11.65. Work includes crosswalk markings, signs, LED enhanced signs, curb ramps and sidewalk. 120246~|~1~|~1~|~01/SAF~|~SRTS Items 87534~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate 75. SFN 5502675 MIA 75 1290 R; SFN 5502829 MIA 75 1328 L; SFN 5502853 MIA 75 13.28 R; 5502640 MIA 75 1290 L;Bridge replacement of 2 structures on IR 75 SFN 5502799 and 5502764 100850~|~1~|~1~|~01/STR~|~LAW 93 11.45-14.33 116482~|~1~|~1~|~01/NHS~|~Replace Culvert 116482~|~1~|~2~|~02/STR~|~Culvert Replacement 116482~|~1~|~3~|~03/NFA~|~Culvert Replacement 116646~|~1~|~1~|~01/STR~|~Chip seal plan split 87271~|~1~|~1~|~01/STR~|~Paving project 122161~|~1~|~1~|~01/SAF/CAMB~|~SRTS - Replacement of sidewalks in the City of Cambridge / Guernsey County 109056~|~1~|~1~|~01/NFP~|~Reconstruction of the POR IR 76 EB and WB rest areas. 122787~|~1~|~1~|~01/SAF~|~All roundabout construction included in this split. 123751~|~1~|~1~|~01/S>2~|~STP > 200,000 plan split 114731~|~1~|~1~|~01/NHS~|~FY25 Overlay 76153~|~1~|~1~|~01/IMS~|~Four-lane resurfacing project using an asphalt superpave treatment. WAS IR 77 12.16-16.41 (SB lanes only). Federal/State 90/10%. 76282~|~1~|~2~|~02/S>2~|~93% of pavement and drainage quantities to use D6 STP funding (SLM 4.69-6.23 which is an large urban STP route) 76282~|~1~|~4~|~04/S>2/FRA~|~100% Franklin County water line relocation 76282~|~1~|~5~|~05/NHS~|~7% of pavement and drainage quantities to use D6 NHS funding (SLM 6.23-6.35) 76282~|~1~|~3~|~03/ENH~|~MORPC enhancement funding for street lighting, bicycle racks, stamped concrete/historical road signs/specific pvmt markings, and landscapingLocal sponsor is Prairie Township 76282~|~1~|~1~|~01/SAF~|~Safety funded project on FRA-40/West Broad from W of Hilliard Rome Rd to E of I-270.Median curb, signals, driveways 76282~|~1~|~6~|~06/S>2~|~Added plan split (Part Code 6) for 100% Columbia Gas due to utility delays 76282~|~1~|~7~|~07/S>2~|~100% AT&T costs due to utility delays 76282~|~1~|~8~|~08/S>2~|~Cost to accelerate project to keep on schedule due to utility delays 107542~|~1~|~1~|~01/STR~|~Resurfacing JEF-151 from SLM 12.02 to 15.52 107542~|~1~|~2~|~02/S<2~|~Resurfacing JEF-151 from SLM 15.52 to 16.43 (SR 7) 107542~|~1~|~3~|~03/NHS~|~Resurfacing SR 151 from SLM 16.02 to 16.16 86651~|~1~|~1~|~01/NHS~|~Urban paving project with Columbus.FRA-33: SLM 14.35-15.40Dublin Rd from the leave Grandview Hts corp to SR-315FRA-33: 15.40-16.32Dublin Rd & Long St from SR-315 to Marconi BlvdFRA-33D: SLm 1.00-1.22Spring St from 4th ST to High St 86651~|~1~|~2~|~02/NHS~|~D6 funding for work on 2 structures (patching, sealing):2501449 FRA US33 15.53 Intersect: Olentangy River2501473 FRA US33 15.53 Intersect: Olentangy River 86651~|~1~|~3~|~03/NHS/COLS~|~100% Columbus Items for pavement repair 96143~|~1~|~1~|~01/NHS~|~01/NHS/OT; $500,000 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) Program. Funds needed over this amount will come from the District Preservation Program SACs 4PF7 and 4PS7. 110397~|~1~|~1~|~01/STR~|~Landslide repair. 106268~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: DEL-36-11.29-12.45 DEL-36-12.70-12.81 106268~|~1~|~2~|~02/NHS~|~Pavement and misc items associated with resurfacing of US36 outside of the City of Delaware Corp Limit 91514~|~1~|~1~|~01/STR~|~General system resurfacing of MAR-47 from SR-257 to Waldo S Corp 89151~|~1~|~1~|~01/BRF/CCEO~|~"01/BRF/BR/CCEO" - CEAO Funding 4B87 (80% Federal) / LNTP (20% Local) - CEAO CAP = $277,632.00 Federal requiring local match - Replacement of 1632639 COS CR17 0.07 Intersect: Simmons Run; BR Eligible for Replacement: Length=42 SD/FO(1) SR=42.3 DSR=6 121466~|~1~|~1~|~01/NFP~|~added plan split. 84610~|~1~|~1~|~01/S>2~|~Replace or rehabilitate bridge CLE-28-0854 (SFN 1300067) over O'Bannon Creek. 118107~|~1~|~1~|~01/NHS~|~Added plan split. 111842~|~1~|~1~|~01/SAF~|~Install a mini-roundabout at the intersection of Miami Rd and Galbraith Rd 111842~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded work added via change order. Includes coloring stamped concrete roundabout center island. 109705~|~1~|~1~|~01/NFP~|~Annual restriping in western D05 counties. 114999~|~1~|~1~|~01/STR~|~Lighting Maintainance 100240~|~1~|~1~|~01/MPO~|~Repair and resurface Pearl Road using MPO STP funds. 122749~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 115770~|~1~|~1~|~01/STR~|~Emergency A Repair. 115770~|~1~|~2~|~02/STR~|~Type B rock and delivery to the site. 111345~|~1~|~1~|~01/NFA~|~Split for paving work 102018~|~1~|~1~|~01/S<2~|~Bridge deck replacement and other associated bridge items. 108259~|~1~|~1~|~01/CMQ~|~construction of a separated bicycle facility and enhancements that is eligible for federal-aid 86760~|~1~|~1~|~01/IMS~|~Correction of landslide and noise wall along the existing R/W. Slide has damaged the noise wall at this location. 0.2 miles N of SR125 on IR 275 SB. 86760~|~1~|~2~|~02/NHS~|~Maintenance of soundwalls on BUT-129 and HAM-126 86760~|~1~|~3~|~03/IMS~|~Maintenance of soundwall on GRE-675 116622~|~1~|~1~|~01/NFP~|~Lighting 101482~|~1~|~1~|~01/NHS~|~DSR# TUS-001 93779~|~1~|~1~|~01/STR~|~Rebuild right deck edge using anodes, encase rear pier columns, overlay bridge deck with Microsilica overlay system, and remove and seal under deck spalls along centerline on SFN 5504864 MIA 721 0521 on Hog Run. 85608~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 119384~|~1~|~1~|~01/S>2~|~Bike/Ped Trail Improvements Major-STP-Other Fed Aid 119384~|~1~|~2~|~02/NFA~|~Bike/Ped Improvements Local-Not on Fed Aid 124044~|~1~|~1~|~01/NFP~|~Plan split for tree and brush removal 83349~|~1~|~1~|~01/BRF~|~Remove and replace the existing bridge with a three span prestressed concrete box or I Beam structure on County Road 86 in Miami County, SFN 5533589 MIA CR 86 2.01. Bridge is less than 20 feet so it does not qualify to use federal funds. 110270~|~1~|~1~|~01/NFP~|~Repair the deck edge and perform under pinning to the Englewood Reserve Pattys Bridge. 123833~|~1~|~1~|~01/NFP~|~Plan split for bridge maintenance activities utilizing 100% State funding 110002~|~1~|~1~|~01/STR~|~Culvert repair/replace 92095~|~1~|~1~|~01/BRO~|~6200664 OTT TR35 26.4 Intersect: Twp Rd 35 (Lightner Road) 82979~|~1~|~1~|~01/NFA~|~Major Rehabilitation Funding (4MT7) - No Cap - FDR treatment on COS/KNO 715 116101~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in ATB, MAH and TRU counties. 104502~|~1~|~1~|~01/SAF~|~All work on US 36 except surface course and pavement markings 104502~|~1~|~2~|~02/STR/Del~|~Work on Galena Rd CR 34) North & South 104502~|~1~|~3~|~03/NHS~|~Surface course and pavement markings on US 36 79798~|~1~|~1~|~01/STR~|~LAW SR93 6.11 @ Pine Grove Road - Intersection ImprovementBegin project 0.48 mile north of TR1329 (Valley Rd.) (SLM 6.11) and end project 0.41 mile south of TR169 (Ellisonville Rd.) (SLM 6.77). It is proposed to improve the intersection of SR93 & CR26 (Pine Grove-Smokey Row Road) by constructing a left turn lane on SR93 to service CR26. 80 Fed/20 state 01/STR/PV/State 117955~|~1~|~1~|~01/SAF~|~Work on IR 71 and US 35 ramps 117955~|~1~|~2~|~02/SAF~|~Work on SR 435 121502~|~1~|~1~|~01/SAF~|~Guardrail replacement/adjustments 93834~|~1~|~1~|~01/STR~|~Bridge ReplacementHIG 138 23.62 102125~|~1~|~1~|~01/STR~|~CEAO STP federal funds (4B77) and LPA funds (LNTP); 80%/20% respectively. 94503~|~1~|~1~|~01/NFP~|~District wide RPM plan for FY 17 systematic RPM replacement 105857~|~1~|~3~|~03/IMS/DEOG~|~Items associated with Dominion East Ohio Gas line on the structure. 105857~|~1~|~1~|~01/IMS~|~Deck replacement and superstructure replacement >20' span. 105857~|~1~|~2~|~02/IMS/YTOW~|~Items associated with City of Youngstown waterline on the structure. 105857~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 119172~|~1~|~1~|~01/STR~|~Rural Plan Split 109199~|~1~|~1~|~01/NHS~|~Slide repairLAW 52 22.09 107863~|~1~|~1~|~01/STR~|~Federal Disaster Relief Funds - 4BY7 (80% Federal) / 4BE7 (20% State) - No CAP - Repair of the slip above the roadway - Gue-US 40-14.31 109618~|~1~|~1~|~01/S<2~|~Resurfacing JEF-43 109618~|~1~|~2~|~02/NFA~|~Asphalt resurfacing of "Service Road D" in the villages of Empire and Stratton due to a maintenance agreement. 109618~|~1~|~3~|~03/S<2~|~Asphalt resurfacing within the City of Steubenville, SR 43 from SLM 4.38 to SLM 4.48. 92848~|~1~|~1~|~01/BRF~|~Bridge replacement 119418~|~1~|~1~|~01/BRF~|~Bridge replacement project 88845~|~1~|~1~|~01/STR~|~Resurfacing with rural STP funds. Funding from the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. 95098~|~1~|~1~|~01/S<2~|~Extend East High St from Mill St to Orr St 113960~|~1~|~1~|~01/MPO~|~Resurfacing eligible items. 113960~|~1~|~3~|~03/MPO~|~Lorain County portions. 113960~|~1~|~2~|~02/MPO~|~City of Vermilion Portion 103363~|~1~|~1~|~01/BRF~|~Local bridge removal. 124134~|~1~|~1~|~01/SAE~|~Safety work at signalized intersection of SR-63 & Lawton Ave, Main St and Britton Ln 100670~|~1~|~1~|~01/NHS~|~This plan split is for the highway lighting replacement at the BEL 7 8.14 interchange, the BEL 7 11.62 interchange and the BEL 7 13.62 interchange. 116722~|~1~|~1~|~01/STR~|~All work is in this plan split. 111929~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using a concrete pavement repair. WAS 77 6.63-17.64. Interstate route funded 90% Federal/10% State. 116499~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during project scoping. 113943~|~1~|~1~|~01/NFA~|~Chip seal project. MOE 260 0.00-4.33, WAS 260 0.48-9.76, 9.98-11.00. Not on the federal aid system. Funded 100% State. 113943~|~1~|~2~|~02/STR~|~Chip seal project. NOB 821 13.22-21.36. 108240~|~1~|~1~|~01/MPO/BARB~|~Reconstruction of Wooster Rd from Hudson Run Rd to 2nd St NW. 108240~|~1~|~4~|~04/NFA/BARB~|~Widen existing sidewalks on bridges. 108240~|~1~|~3~|~03/MPO/BARB~|~Resurfacing, Wooster Rd from 31st St to Hudson Run Road. 108240~|~1~|~2~|~02/SAF/BARB~|~Reconstruction of signals along Wooster Rd in Barberton. 108240~|~1~|~5~|~05/NFA/COUN~|~Concrete Overlays for Wolf Creek and Hudson Run bridges only requested by the Summit County Engineer. 98726~|~1~|~1~|~01/NHS~|~Emergency culvert repair. 110797~|~1~|~1~|~01/SAF~|~Improvements at the intersection of US 23 at SR 750 (Powell Rd) 123850~|~1~|~1~|~01/SAE~|~100% CEAO HSIP Funding (4HB7) 101944~|~1~|~1~|~01/NHS~|~Bridge Repair from Accident Damage. WAY-30-16.61 (SFN 8502153) 98349~|~1~|~1~|~01/SAF~|~Lighting upgrade/replacement project on MOE 7 12.57-13.07 and WAS 7 38.75-38.88 for FY2019. Funded 80 federal/20 state. 91213~|~1~|~3~|~03/STR~|~Remove asphalt wearing coarse on box beam bridge, waterproof, and overla with asphalt. SFN 4601963 LOG SR 235 4.74 91213~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with pavement repairs. LOG SR 235 0.00 to 8.18. 91213~|~1~|~2~|~02/NFA~|~Resurfacing of the existing roadway with pavement repairs. LOG-SR-235 0.000 to 8.180 95947~|~1~|~1~|~01/NFP~|~CNG trucks to be deployed in Canton. 106377~|~1~|~1~|~01/STR~|~Construct H-pile wall at the intersection of SR 39 and SR 164 in Salineville, COL County to stabilize the roadway. 116507~|~1~|~1~|~01/STR~|~Resurfacing using District Preservation Program funds. No local funds. 116507~|~1~|~2~|~02/S50~|~Resurfacing. District Preservation Program funds. No local funds. 116507~|~1~|~3~|~03/SAE~|~Adding centerline rumble strips throughout the length of the project. Funded 100% with safety funds. 102827~|~1~|~1~|~01/NHS~|~NHS pavement 102827~|~1~|~2~|~02/NHS~|~NHS bridge 102827~|~1~|~3~|~03/STR~|~STP Rural Pavement 122361~|~1~|~1~|~01/S>2~|~Plan split for bridge replacement and bridge rehabilitation 84563~|~1~|~1~|~01/S>2~|~Resurfacing of State Route 82 from SLM 0.14 to SLM 0.61, Sagamore Hills Township, Summit County, Ohio. Originally STP Rural, was converted to STP>200 with latest 2030 Urban Boundary update. 84563~|~1~|~2~|~02/S>2~|~Resurfacing of State Route 82 from SLM 0.61 to SLM 1.56, and then SLM 2.14 to SLM 3.47 Sagamore Hills Township, Northfield Center Township, Summit County, Ohio. 84563~|~2~|~6~|~06/S>2~|~Cleveland water pipeline reconstruction. 84563~|~1~|~3~|~03/S>2/Mace~|~Resurfacing of State Route 82 in the City of Macedonia, from SLM 3.47 to SLM 4.05, Summit County, Ohio. 84563~|~1~|~4~|~04/S>2/MACE~|~100% Local items included in the resurfacing of State Route 82 from 3.47 to 4.05 within the city of Macedonia. 84563~|~2~|~5~|~05/SAF~|~Widening of State Route 82 between SLM 1.56 (Holzhauer) to SLM 2.14 (Boyden), Sagamore Hills Township, Summit County, Ohio. 80441~|~1~|~1~|~01/MPO~|~All the work not in the Enhancement split is in this split. The earmark funds should be used first. Then the TRAC funds. Next use the Safety Program funds. After that use the SIB loan funds which will be repaid with MPO funds. Last use events with 100% local funds. 80441~|~1~|~3~|~03/MPO~|~Costs for sign on the bridge. MPO funds can be used for these costs. TRAC, Safety and Transportation Alternatives Program funding cannot. 80441~|~1~|~2~|~02/ENH~|~Work funded with funds by the Transportation Alternative Program. 95% federal with a 5% local match. 112817~|~1~|~1~|~01/STR~|~Resurfacing. 112817~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 112817~|~1~|~4~|~04/STR~|~Minor bridge work 10' to 20' span. 112817~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance. 115772~|~1~|~1~|~01/STR~|~Bridge replacement. 96452~|~1~|~1~|~01/S<2~|~Widening of Cincinnati Dayton Road from West Chester Road to north of the Lesourdsville West Chester Road/Station Road intersection. Realignment of Station Road with Lesourdsville West Chester Road to improve the geometrics at the intersection with Cincinnati Dayton Road. 96452~|~2~|~2~|~02/S<2~|~Widening of Cincinnati Dayton Road to provide an additional center turn lane and southbound thru-lane between Lesourdsville West Chester/Station Road and the IR-75 NB on-ramp. 96452~|~2~|~3~|~03/ENH~|~Replacement of existing sidewalk and installation of new sidewalk along Cincinnati Dayton Road between Lesourdsville West Chester Road/Station Road and the IR-75 NB on ramp. 96452~|~1~|~4~|~04/S<2~|~Plan Split for 100% Waterworks Items included in the project (phases 1 and 2). 113197~|~1~|~1~|~01/MPO~|~Spit for MPO-funded work 113197~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 111571~|~1~|~1~|~01/NHS~|~2 1/2" mill and fill with superpave asphalt on: MOT-48 ALM 6.49 to 6.95 in the City of Kettering. 121119~|~1~|~1~|~01/STR~|~Resurfacing SR 39 121811~|~1~|~1~|~01/NHS~|~Widen US 33 in southeastern Franklin County from 2 to 3 lanes in each direction. 123788~|~1~|~1~|~01/STR~|~stp rural 124381~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of ferally eligible bridge on the interstate system 95352~|~1~|~1~|~01/S<2/SCI~|~It is proposed, on CR50 (Washington Blvd), begin @ SLM 0.00 (CR482) and terminate @ end of route, SLM 2.42 (SR73), to resurface, widen, make horizontal & vertical alignment changes, perform base repair, curb & gutter, storm sewer, culverts, traffic control, and other repairs as needed. Local Let80/20 split w/fed max of $1,631,200.00 124809~|~1~|~1~|~01/NFP~|~Created for J&C involvement 115746~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 (ODOT/City) items on the urban paving resurfacing 115746~|~1~|~2~|~02/NHS/FRK~|~Plan Split for the 100% City items 95356~|~1~|~1~|~01/NFP~|~Craig Bridge 102285~|~1~|~1~|~01/NFA~|~Design and construct salt storage building and a loader building on Scio Outpost/Yard site. 100750~|~1~|~2~|~02/NHS~|~Bridge painting project. MOE 7 21.48 (SFN 5600669). NHS route funded 80 federal/20 state. 100750~|~1~|~3~|~03/S<2~|~Bridge painting project. WAS 339 1.24 (SFN 8403996). Urban other federal aid funded 80 federal/20 state. 100750~|~1~|~1~|~01/IMS~|~Bridge painting project. NOB 77 3.62 L (SFN 6100279), R (SFN 6100309), NOB 77 13.96 (SFN 6100783). Interstate route funded 90 federal/10 state. 119191~|~1~|~1~|~01/STR~|~Plan split for OTT-51-0584 bridge 115785~|~1~|~1~|~01/SAF~|~Safety work 115785~|~1~|~2~|~02/ENH~|~100% LNTP item(s) 90951~|~1~|~2~|~02/IMS~|~Interstate: ASD-71-8.47 / ASD-71-9.95 90951~|~1~|~1~|~01/NHS~|~NHS: WAY-30-3.26 (L&R) & WAY-30-1.00 (L&R) & WAY-0003-11.97 101234~|~1~|~1~|~01/NHS~|~Resurfacing SR 184 0.35-1.86. 96142~|~1~|~1~|~01/IMS~|~Pavement repair. 120439~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 97723~|~1~|~3~|~03/IMS~|~"03/IMS/OT" - District Preservation 4PS7 (100% State) - No CAP - maintenance repair for damaged tower light pole on Gue-IR 70-08.69. 97723~|~1~|~2~|~02/IMS~|~"02/IMS/OT" - District Preservation 4PS7 (100% State) - No CAP - maintenance repair for damaged tower light pole on Lic-IR 70-17.38. 97723~|~1~|~1~|~01/IMS~|~"01/IMS/OT" - District Preservation 4PS7 (100% State) - No CAP - maintenance repair for damaged tower light pole and vertical truss member on Fai=IR 70-01.85. 118750~|~1~|~1~|~01/STR~|~added plan split. 97205~|~1~|~1~|~01/NFA~|~This project is for construction inspection in FY14 and FY15. 124335~|~1~|~1~|~01/SAF~|~Intersection improvement. 117733~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 109872~|~1~|~1~|~01/NFP~|~D09 District Pavement Long Line Markings (B) 121307~|~1~|~3~|~03/S5K~|~Urban Paving Plan Split 121307~|~1~|~4~|~04/NFP~|~Plan Split for 100% locally funded scope in Bellevue, such as full depth pavement repairs 121307~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SEN-18 from SLM 30.476 to 34.728 and SAN-18 from SLM 0.00 to 0.764 121307~|~1~|~2~|~02/S5K~|~Plan split for resurfacing on SAN-18 from SLM 0.764 to 0.864 109252~|~1~|~1~|~01/NFP~|~Spot paving on various routes within POR, STA and SUM Counties. 95745~|~1~|~1~|~01/BRF~|~Bridge deck replacement, painting of existing beams and cross frames, and bearing repairs. 118732~|~1~|~1~|~01/NFA/AKRO~|~Bridge replacement 104763~|~1~|~1~|~01/S<2~|~Pavement Marking on various county roads using 100% 4HB7. 102280~|~1~|~1~|~01/NFP~|~Removal of damaged structure items 93983~|~1~|~1~|~01/NFA~|~Brdg replacement On TR 99, Mackletree Road, 4.81m 0.29 miles from where it ends and intersects with SR125, it is proposed to replace the structure (SFN 7332882). 80% fed/20% local 01/NFA/BR/State 93983~|~1~|~2~|~02/NFA~|~Environmental Mitigation work. 88129~|~1~|~1~|~01/IMS~|~Replace railroad bridge over I 75 southbound. Plan split for Part 1 work (PID 88129). 88129~|~1~|~2~|~02/IMS~|~Plan split 2 is for Part 2 work (PID 122358). Construction of a portion of ramp/CD road improvements under the existing railroad bridge north of Galbraith Road. 123000~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4. 107715~|~1~|~1~|~01/MPO~|~Fiber optic interconnect through existing conduit to Clete McDaniels Sports Complex and Schuler Sports Complex. Also finalizing fiber work related to interconnection of signals and cameras on Montgomery Road, Kenwood Road, and Galbraith Road. 98137~|~1~|~1~|~01/S<2~|~PIK 551 & 552 84943~|~1~|~1~|~01/BRF~|~7153457 ROS CR600 3.06 Intersect: Indian Creek80/20 split local match Ross County. 01/BRF/BR/ROS 119980~|~1~|~1~|~01/CMQ~|~Replace two way stop controlled intersection with a traffic signal and turn lanes at indian Ripple Road and Factory Road 124872~|~1~|~1~|~01/SAF~|~Primary plan split for CEAO Safety funding 75143~|~1~|~1~|~01/SAF/FCEO~|~"01/SAF/PV/FCEO" - CEAO Safety Project 4HB7 (80% Federal) / LNTB (20% Local Match) - CAP Federal CAP of $1,984,320.00 requiring $496,080.00 local match. Fai-CR 17-03.56 to 04.08; widening with full depth replacement and should additions with new overlay. 96657~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 50 3.58-4.42, WAS 7 4.42-7.18 and WAS 618 1.40-1.86. Funded 80% Federal/20% State. 96657~|~1~|~2~|~02/S50~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 618 0.16-1.40, 1.86-3.22. Funded 80% Federal/20% State. 96657~|~1~|~3~|~03/SAF~|~Safety widening on WAS SR 618 0.47. 113863~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/PV/KCEO" -100% Safety (4HJ7/TRC) - widening CR 14 for paved shoulders. 120648~|~1~|~1~|~01/MPO~|~Plan Split for scope eligible for MPO Carbon Reduction Program funding 92098~|~1~|~1~|~01/CMQ~|~Project includes installation of a centralized County Traffic Management Center (CTMC) at the CCEO to control 49 existing traffic signals, adaptive signal control system at 12 signals in the Eastgate Retail District and associated detection systems, signal controller replacement at 9 signals, signal controller upgrades for IP communications at 40 signals, installation of communication network including 3G/4G wireless service equipment, LED upgrades at 37 intersections and 17 school zone flashers, video detection upgrades at 28 intersections, loop detector replacement/repair at 14 intersections, PTZ camera installation at 18 intersections, ped signal upgrades at 8 intersections, pushbutton upgrades at 3 intersections, controller cabinet maintenance pad installation at 9 intersections, stream monitoring gauge near the intersection of Locust Corner Rd and Nine Mile Rd, support for future system capabilities including Smart Work Zones for CCTID RTIP projects, integration with ODOT traffic systems, emergency vehicle preemption, etc., and associated ADA curb ramp installation/upgrades. 97907~|~1~|~1~|~01/ENH~|~Gettysburg Ave from Kammer Ave to Fairbanks Ave - Hoover Ave from Marvine Ave to Bedord Ave - This project will install pedestrian amenities such as replacement of defective sidewalks and curbing, the installation of banners, decorative lighting and other assorted amenities. 115646~|~1~|~1~|~01/S>2~|~SR16 (East Broad Street) from Outerbelt Street to Reynoldsburg-New Albany Road. Major widening from four to six lanes including intersection improvements. 97553~|~1~|~1~|~01/BRF/MED~|~SFN 5233240, Ohio Bridge Partnership Program, West Smith Road over Champion Creek 97553~|~1~|~3~|~03/BRF/MED~|~SFN 5265894, Ohio Bridge Partnership Program, N. Harmony Street over Bradway Creek 97553~|~1~|~2~|~02/BRF/MED~|~SFN 5235537, Ohio Bridge Partnership Program, Bagdad Road over the West Branch of the Rocky River 121932~|~1~|~1~|~01/NFP~|~Plan split for replacement of existing queue warning signs and installation of a new queue warning sign on I-675 in Greene County. Funded by TSMO. 121932~|~1~|~2~|~02/NFP~|~Plan split for replacement of dynamic message signs on various routes in District 8. 113160~|~1~|~1~|~01/ENH~|~Construct hike and bike trail between 3rd Ave and Exchange St in the city of Akron. 106302~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4. 95221~|~1~|~1~|~01/IMS~|~Concrete bridge deck replacement NOB 77 0362 R (SFN 6100309). Interstate route funded 90 federal/10 state. 113221~|~1~|~1~|~01/NFP~|~D9 culvert project FY26 93154~|~1~|~4~|~04/S<2~|~WCH urban paving of FAY-753: 11.66-12.58In WCH func class area 93154~|~1~|~2~|~02/STR~|~General system paving of FAY-753: 10.51-10.72STP route in rural func class area 93154~|~1~|~3~|~03/S<2~|~General system paving of FAY-753: 10.72-11.66In WCH func class area 93154~|~1~|~1~|~01/NFA~|~100% state general system paving of FAY-753: 0.15-10.51 102583~|~1~|~1~|~01/STR~|~Work on US 68 in Hancock County from beginning of the project at 1.04 to the Findlay Urban Area boundary at approximately 11.66 which is just before the ramp. District Preservation Program funds. No local funds. 102583~|~1~|~2~|~02/S<2~|~Work on US 68 in Hancock County from the Findlay Urban Area boundary at approximately 11.66 which is just before the ramp to 12.01. District Preservation Program funds. No local funds. 102583~|~1~|~3~|~03/NHS~|~Work on US 68 in Hancock County from 12.01 to the end of the project at 12.13. District Preservation Program funds. No local funds. 105242~|~1~|~1~|~01/STR~|~Resurfacing SR 170 120446~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 91775~|~1~|~1~|~01/NHS~|~Asphalt resurfacing on WAS US 50 0.00-4.96. 101439~|~1~|~1~|~01/NHS~|~NHS District Allocation - Major Rehab 101439~|~1~|~2~|~02/NHS~|~Bridge Work has been Determined.Preventive Maintenance:Bridge railing upgrade/repair (061)Deck Sealing (051)Reactive Maintenance:Exp jt repair/repl (048) 101439~|~1~|~3~|~03/SAF~|~intersection improvements 107874~|~1~|~2~|~02/IMS~|~All concrete repair work on I-75 ramps at SR 613 and SR 12. 107874~|~1~|~1~|~01/NHS~|~Concrete repair work on US 30. 91461~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 682 0.75-1.95 and 2.15-4.73. Urban other federal aid funded 80 federal/20 state. 112908~|~1~|~6~|~06/NFP~|~Plan split for material buyback. 86700~|~1~|~1~|~01/NHS~|~NHS: ASD 250 6.34-8.46, CRA 30 4.07-9.74, ERI 101 6.13-7.15, HUR 20 8.56-10.76, LOR 18 1.65-3.30 and 11.44-13.96 86700~|~1~|~3~|~03/S<2~|~STP < 200000: ERI 101 3.86-6.13, LOR 57 12.19-12.93 86700~|~1~|~2~|~02/STR~|~STP Rural: MED 83 0.94-3.46, WAY 83 16.30-25.03 86700~|~1~|~4~|~04/S>2~|~STP > 200000: LOR 83 10.61-10.97 and 11.76-12.50, LOR 83C 0.00-0.28. 114914~|~1~|~1~|~01/NFP~|~Crack Seal plan split 106538~|~1~|~1~|~01/BRF~|~JAC TR 973 0.08 (SFN 4031105) 121241~|~1~|~1~|~01/S5K~|~Preble County signs 105371~|~1~|~1~|~01/STR~|~Microsurface on rural routes: MER SR 49 SLM 13.91 to 21.45 & MER SR 118 SLM 17.98 to 23.76 114382~|~1~|~1~|~01/NHS~|~Rehabilitate bridge carrying pedestrian traffic over SR 7 by replacing the superstructure and pedestrian access on east side of bridge. 112753~|~1~|~1~|~01/MPO~|~Resurfacing Norton Ave from Cleveland-Massillon Rd to Norton East Corp Limit. 117984~|~1~|~1~|~01/BRF~|~Bridge replacement 109036~|~1~|~1~|~01/NHS~|~Sign Replacement. 14198~|~1~|~1~|~01/IMS~|~Funding for the painting of structural steel. 122224~|~1~|~1~|~01/STR~|~Conduit extension and headwall replacements. 122224~|~1~|~2~|~02/S5K~|~Conduit replacement. 113029~|~1~|~1~|~01/S>2~|~Resurfacing of SUM SR 619 from 2.97 to 3.10 and 3.13 to 3.85. 113029~|~1~|~2~|~02/S>2/BARB~|~Resurfacing of SUM SR 619 from 2.06 to 2.97 and 3.10 to 3.13, urban paving in the City of Barberton. 109833~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order. 115133~|~1~|~1~|~01/IMS~|~Landslide repair by drilled shaft retaining wall. 121210~|~1~|~1~|~01/ENH~|~Sidewalk/SUP construction utilizing Federal OMEGA 4TF7 funds at 80/20 up to CAP. 104353~|~1~|~1~|~01/S<2/KCEO~|~"01/S<2/PV/KCEO" Knox County CEAO approved - federal max of $428,800 for resurfacing of CR83 (Parrott Street) 110723~|~1~|~1~|~01/STR~|~Slide repair from OH19-01 ER event. 91732~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. GAL 790 0.00-5.65 and VIN 328 0.00-3.32, 4.54-10.29. Not on any federal aid system funded 100% state. 91732~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using a chip seal treatment. ATH 685 0.00-0.30. Urban federal aid funded 80 federal/20 state. 91732~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. ATH 685 0.30-5.24, GAL 790 5.65-6.67, MEG 124 0.00-7.50, VIN 124 0.00-5.74, 6.03-6.44, and VIN 328 3.32-4.54. Rural other federal aid funded 80 federal/20 state. 105324~|~1~|~1~|~01/NHS~|~Rehabilitate bridge BEL-7-1975 (SFN 0700541) by repairing substructure units, patching deck, replacing expansion joints and repairing pin/hanger assembly. 122301~|~1~|~1~|~01/NFA~|~Created for J&C involvement 94040~|~1~|~1~|~01/BRF~|~Rehabilitation of the Delphos-St. Marys Road Bridge over Sixmile Creek, modifiying abutments to accept the new beams and paving approaches along with installing guardrail to meet current standards on SFN 0634697 AUG CR 66A 18.97. 121634~|~1~|~2~|~02/ENH~|~Construction of a shared-use path and street lighting 121634~|~1~|~1~|~01/NHS~|~Resurfacing 109912~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded. 109912~|~1~|~2~|~02/NFP~|~Retroactive fuel price adjustment 123477~|~1~|~1~|~01/NFP~|~Replacing guardrail on various routes throughout District 4. 107510~|~1~|~1~|~01/NHS~|~Resurfacing HAS-151 91599~|~1~|~1~|~01/IMS~|~Remove and replace the existing reinforced concrete deck on bridge (TUS-77-1980L, SFN 7902700) with a new reinforced concrete deck and repair substructure units. Also provide new approach slabs. 119747~|~1~|~1~|~01/ENH/WLFY~|~Construction of sidewalks within Village of West Lafayette. 124760~|~1~|~1~|~01/S>2~|~Repairs to structure FRA-62-9.21 over Scioto Big Run 102301~|~1~|~1~|~01/STR~|~Split for culvert work 114879~|~1~|~1~|~01/NFP~|~Created for J&C involvement 103621~|~1~|~1~|~01/NHS~|~Place concrete deck overlay on FRA-317-16.68 over Big Walnut Creek 115848~|~1~|~1~|~01/IMS~|~Reactive Pavement Maintenance. 76388~|~1~|~2~|~02/S>2/RICH~|~Construction of video detection equipment at State Route 21 and the Ohio Turnpike and State Route 21 at Columbia Road. Summit County, Ohio. 76388~|~1~|~1~|~01/S>2~|~Resurfacing from IR77 to Cuyahoga County (SLM 19.57-20.77) line on State Route 21, in the Village of Peninsula, Summit County, Ohio. 87187~|~1~|~2~|~02/STR~|~Resurface and perform pavement repair on the Rural portions of SR 73 and SR 122 in Bulter County. The limits of the Rural portion are on SR 122 between SLM 3.86 to 6.07. 87187~|~1~|~1~|~01/S<2~|~Resurface and perform pavement repair on the Urban portions of SR 73 and SR 122 in Bulter County. The limits of the Urban portion are on SR 73 between SLM 16.81 to 18.51; and on SR 122 between SLM 6.07 to 6.13. 102417~|~1~|~1~|~01/S>2~|~Resurfacing to MAH US 62 from 9.67 to 12.98Fine graded polymer AC Overlay to MAH US 62 from 12.98 to 13.1698 107157~|~1~|~1~|~01/IMS~|~Geological Site Management Funding - 4SF7 (90% Federal) / 4SS7 (10% State) - Rock scaling along IR 70 in Licking County. 100362~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 119569~|~1~|~1~|~01/S>2~|~Construct intersection & safety improvements 106768~|~1~|~1~|~01/SAF~|~Intersections: LOR-57 & 254, MED-3 & Hamilton, and MED-42 & Hamilton install Wavetronix Radar Detectors 103786~|~1~|~1~|~01/STR~|~Landslide repair. MRG 377 12.70. DSR MRG-002. 95426~|~1~|~1~|~01/NHS~|~Subsurface exploration for abandoned underground mines. ATH 33 7.09. NHS route funded 80 federal/20 state. 120932~|~1~|~1~|~01/NFP~|~Tree stump and pruning. 95465~|~1~|~1~|~01/NHS~|~District Preservation 7BPB (100% Bond) then 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comment - Resurfacing on Lic-SR 161-00.00 to 1.66 and Lic- SR 161- 2.99 to 8.84; Lic-SR 37-12.22 to 16.21, included are repairs on SR 310 concrete ramp 95465~|~1~|~3~|~03/NHS~|~District 6 Preservation Pavement Funding - 4PF7 (80%Federal)/4PS7 (20% State) - No CAP- Resurfacing on Fra-161-22.69 to 23.71 95465~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funds - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge Deck Sealing on LIC-161-00.00 114937~|~1~|~1~|~01/S<2~|~Remove Br. No. LOG-273-0002 and replace with new structure. 85051~|~1~|~4~|~04/S<2~|~100% City of Mansfield Items within split corp areas at south end of project 85051~|~1~|~3~|~03/S<2~|~Resurfacing within Mansfield Corp Limits 80/20 - District Allocation/City of Mansfield - Split Corp Areas at south end of project 85051~|~1~|~5~|~05/STR~|~Work to structures sfn:7006632 RIC-545-08.60 and sfn:7006691 RIC-545-10.12 85051~|~1~|~1~|~01/STR~|~District Allocation - Resurfacing - Rural - RIC-545-2.80-11.48/ASD-545-00.00 - 05.47 85051~|~1~|~2~|~02/S<2~|~District Allocation - Resurfacing - Urbanized Area - RIC-545-01.44 - 02.80 119341~|~1~|~1~|~01/IMS~|~Resurfacing. 119341~|~1~|~2~|~02/NHS~|~Resurfacing. 95952~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority 92643~|~1~|~1~|~01/NHS/Canf~|~Resurfacing of US-224 from SLM 12.69 to SLM 13.23, in the City of Canfield, Mahoning County, Ohio. 92643~|~1~|~2~|~02/S>2/Canf~|~Resurfacing of SR-46 from SLM 9.29 to SLM 9.39, US-62 from SLM 8.40 to SLM 8.69, SR-46D from SLM 0.29 to SLM 0.39, US-62F from SLM 0.00 to SLM 0.29, in the City of Canfield, Mahoning County, Ohio. 120490~|~1~|~1~|~01/NFA~|~Created for J&C involvement 94520~|~1~|~1~|~01/SAF~|~Provide anti-skid treatment on portion of Foster Maineville, add lighiting to intersection of Foster Maineville at Butterworth and place optical speed bar markings on wilmington road east on nixon camp road. 101241~|~1~|~1~|~01/STR~|~Resurfacing SR 4 (STP Rural). 101241~|~1~|~2~|~02/BRO~|~Plan split for SEN-4-0441 bridge 96940~|~1~|~1~|~01/NFA~|~Task order construction inspection services. 87160~|~1~|~1~|~01/STR~|~Rural route. GSMP funds. Failed embankment. replace culvert, flatten out embankment to mitigate landslide. 123781~|~1~|~1~|~01/IMS~|~Deck Replacement. 107242~|~1~|~1~|~01/NFA~|~The City will extend Colleta's Way in the City's industrial park 1850 feet north. 119445~|~1~|~1~|~01/BRF~|~Plan split for municipal bridge work. 84221~|~1~|~1~|~01/STR~|~Resurfacing of existing roadway with asphalt concrete State Route 47 in Ansonia from East Corporation Limit (SLM 11.05) to US Route 127 (SLM 13.88). 84221~|~1~|~2~|~02/STR~|~Pavement markers needed along the resurfacing project 99658~|~1~|~1~|~01/NFP~|~Pavement marking maintenance contract 100896~|~1~|~1~|~01/NFA~|~BRO 763 1.51 (SFN 0803901) 114254~|~1~|~1~|~01/SAF~|~Intersection improvements at Parkville/Spring Run 114254~|~2~|~2~|~02/SAF~|~SUP from Maple Canyon to Cleveland Ave 94417~|~1~|~2~|~02/STR~|~Bridge Work 94417~|~1~|~1~|~01/NFA~|~2 lane resurfacing 115609~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 97576~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Replacement of deficient bridge (4536428) on Licking County Road 39 utilizing CEAO funding (4B87) w/ Federal max (at 80%) of $645,920. 91342~|~1~|~1~|~01/S<2~|~Urban paving SR 188 from SLM 0.00 (US 22) to 0.22; 0.31 to 1.43; 1.66 to 2.57 91342~|~1~|~2~|~02/STR~|~General system resurfacing SR 188 SLM 1.43 to 1.66 91446~|~1~|~1~|~01/S>2~|~Westerville urban pavingDEL-3: 0.00-1.38 100917~|~1~|~1~|~01/NFA~|~Adding J&C Funding Event 107584~|~1~|~1~|~01/STR~|~Flat Sheet sign project for FY2022 for MRG county. 80% Federal and 20% State funded. 107584~|~1~|~2~|~02/NFA~|~Flat Sheet sign project for FY2022 for MRG county. 120484~|~1~|~1~|~01/S>2~|~Bridge replacement 111413~|~1~|~1~|~01/ENH~|~Construct sidewalks along S. Washington St. at 95% Federal/5% Local (95% 4B37/5% LNTP) 94428~|~1~|~2~|~02/STR~|~Two Lane Resurfacing WAY-604-18.59 to 20.66 94428~|~1~|~1~|~01/NFA~|~Two Lane Resurfacing WAY-604-7.56 to 18.59 (Not on Federal Aid System) 97644~|~1~|~1~|~01/BRF~|~SFN 8750025 97644~|~1~|~2~|~02/BRF~|~SFN 8757720 97644~|~1~|~4~|~04/BRO~|~SFN 8732477 97644~|~1~|~3~|~03/BRO~|~SFN 8747717 88568~|~1~|~1~|~01/NFA~|~Resurface the existing SR 364 roadway with asphalt concrete AUG-SR-364 0.000 to 5.710 MER-SR-364 0.000 to 0.040 DAR-SR-364 0.000 to 1.030 119252~|~1~|~1~|~01/S>2~|~Resurfacing. 119252~|~1~|~2~|~02/STR~|~Resurfacing. 119252~|~1~|~3~|~03/S5K~|~Resurfacing. 119921~|~1~|~2~|~02/NHS~|~Plan Split 2 using District Allocation to cover construction costs over the capped Protect funds amount. 119921~|~1~|~1~|~01/BRO~|~PROTECT bridge from scour by extending pier piling encasement and installing RCP along piers. 101458~|~1~|~1~|~01/STR~|~DSR# JEF-006 115666~|~1~|~1~|~01/S<2~|~Urban resurfacing west corporation limit of Germantown 99762~|~1~|~1~|~01/S<2~|~Mill & Fill Palmer Street from Pittsburg to Bowman. 100662~|~1~|~1~|~01/STR~|~Chip sealing BEL-9 from TR 1090 to the HAS Co. Line and BEL-647 from SLM 2.47 to the JEF Co. Line. 100662~|~1~|~2~|~02/S<2~|~Chip sealing BEL-647 from Martins Ferry WCL (SLM 1.62) to SLM 2.47. 86153~|~1~|~1~|~01/BRO~|~Bridge replacement project. NOB 147 0535, SFN 6102700. BR Eligible. Funded 80 federal/20 state. 89154~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge Project 102780~|~1~|~1~|~01/STR~|~This plan split is for bridge work on rural routes. 93118~|~1~|~1~|~01/STR~|~District Allocation 93118~|~1~|~2~|~02/STR~|~BridgesSFN 0300799 ASD-39-1.31SFN 0300829 ASD-39-1.62SFN 0300845 ASD-39-3.58SFN 0300926 ASD-39-4.89SFN 7002556 ASD-39-26.56 84539~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 26 16.33-17.06, 29.45-30.10, MOE 145 17.87-21.41 and 22.06-25.80. Rural other federal aid funded 80 federal/20 state. 84539~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 26 17.06-17.91. Not on any federal aid system funded 100% state. 93706~|~1~|~1~|~01/S>2~|~80/20 split between federal and local for the resurfacing of Bainbridge Road using MPO STP funds. 114663~|~1~|~1~|~01/NHS~|~Project to repair bridge HAM-50-22-18 and HAM-50-2316 that both carry US 50 over a relief area below Mt Adams in Cincinnati. Repairs include pier repairs, expansion joint repairs, abutment repairs, and other related items. 106201~|~1~|~1~|~01/IMS~|~Lighting system improvements on STA IR 77 at SR 800. 99770~|~1~|~1~|~01/NFP~|~Crack sealing of drives and parking areas within Garber Nature Center, a Preble County Park District property. Parking lots will be re-striped and backup aggregate berm will be provided where necessary. 95113~|~1~|~1~|~01/ENH/Camp~|~New lighting to Casey Drive in Campbell and Bob Cene Way in Struthers, Trumbull County, Ohio. 111130~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE CR 29 6.93 SFN 5631068. Funded 100% Federal. 123937~|~1~|~1~|~01/NFA~|~Slope stabilization along SR 284 in Muskingum County. 94048~|~1~|~5~|~05/NFP~|~Bridge repair and spot painting of structure SFN# 7603312, STA-IR77-8.28. 94048~|~1~|~4~|~04/NFP~|~Bridge repair and spot painting of structure SFN# 7711220, SUM-SR764-2.14. 94048~|~1~|~3~|~03/NFP~|~Bridge repair and spot painting of structure SFN# 7704534, SUM-IR77-30.96. 94048~|~1~|~1~|~01/NFP~|~Bridge repair and spot painting of structure SFN# 7607423, STA-US30-7.68, 94048~|~1~|~2~|~02/NFP~|~Bridge repair and spot painting of structure SFN# 7603568, STA-IR77-9.08R. 100920~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete various routes in Champaign County: CHP SR54 SLM 1.70 to 8.28 CHP SR550 SLM 0.27 to 0.59 116745~|~1~|~1~|~01/IMS~|~Culvert plan split for the spray liner on DEL-71-5.751. 94516~|~1~|~1~|~01/NHS~|~Bridge re-deck of sfn# 5005434, provide repairs to slope protection, including steel retaining wall. Replace signing. In the City of Youngstown, Mahoning County, Ohio. 98859~|~1~|~1~|~01/SAF~|~Replace all of the controllers and coordinating them with a radio interconnect that will communicate with the exisiting control system. In addition add PTZ cameras where applicable. 98859~|~1~|~2~|~02/S>2~|~Replace existing span wire traffic signal supports with mast arms and provide back plates and new vehicle detection installation. 94583~|~1~|~1~|~01/IMS~|~Apply antiskid treatment to a portion of Ramps A, C, D, G and H 105970~|~1~|~1~|~01/BRF~|~Bridge Replacement Split 117495~|~1~|~1~|~01/MPO/STCE~|~Construct roundabout. 121486~|~1~|~1~|~01/STR~|~STP Rural Plan split 121486~|~1~|~2~|~02/S5K~|~STP 5,000 Plan Split 122881~|~1~|~1~|~01/NFP~|~All work included in this plan split. 107472~|~1~|~1~|~01/STR~|~Microsurface existing surface 107472~|~1~|~2~|~02/S<2~|~Microsurface existing surface 118648~|~1~|~1~|~01/S50~|~Bridge replacement on 6th Street int he City of Mansfield (Muni-bridge funding) 118648~|~1~|~2~|~02/S50~|~Muni-bridge funding for 6th Street bridge replacement - CE 86982~|~1~|~1~|~01/NHS~|~Resurfacing of NHS Federal 80%/ State 20%. ATH US 33 5.75-5.95. 86982~|~1~|~3~|~03/NHS~|~NHS Federal with Nelsonville 80% Federal and 20% Local. ATH US 33 1.88-5.57, 5.68-5.73. 86982~|~1~|~4~|~04/S<2~|~Other Federal Aid Prin Art Federal 80%/Local 20%. 86982~|~1~|~2~|~02/STR~|~Resurface Prin Art (other) Federal 80%/State 20%. HOC US 33 16.82-18.93. 96951~|~1~|~1~|~01/STR/HIG~|~It is proposed to replace an entire structure on SR 134, 0.60 miles north of US 50 in Highland Co. 121097~|~1~|~1~|~01/NFP~|~Plan Split 112289~|~1~|~1~|~01/STR~|~PIK-104-0.71 Culvert Replacement 108213~|~1~|~1~|~01/IMS~|~Landscape maintenance at various interchanges 98219~|~1~|~1~|~01/IMS~|~Median inlets 107329~|~1~|~1~|~01/NFP~|~Split for tree removal/trimming work 96195~|~1~|~1~|~01/STR~|~Widening of State Route 44 from Interstate 76 to County Route 18 (Tallmadge Road), Rootstown Township, Portage County, Ohio. 101045~|~1~|~1~|~01/S>2~|~Resurfacing MAH SR 46 from 10.83 to 13.84MAH SR 625 from 0.22 to 2.59TRU SR 46 from 0.12 to 1.85 124343~|~1~|~1~|~01/SAF~|~Local-Let - Safe Routes to School project - Safety funded 4SC7 92172~|~1~|~1~|~01/NFP~|~Pavement marking at various locations. 100% State. 106406~|~1~|~1~|~01/SAF~|~Widen pavement to provide north bound left turn lane 106406~|~1~|~2~|~02/S>2~|~Work to extend culvert at SLM 4.83 106406~|~1~|~3~|~03/S>2~|~Resurfacing SR 104 with limits of MOT 100448~|~1~|~1~|~01/SAF~|~FY2021 District wide raised pavement markers. 106157~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 5.61. DSR MRG-004. Rural other federal aid funded 80 federal/20 state. ER funds. 87162~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment. Install retaining wall to mitigate landslide. 105695~|~1~|~1~|~01/S>2~|~Apply herbicide along roadsides for weed control on 4 lane roads. 91842~|~1~|~1~|~01/S<2~|~General System asphalt resurfacing on COL-170-0..; includes asphalt overlay, pavement repairs, pavement marking 105269~|~1~|~1~|~01/NHS~|~Resurfacing of COL-30 from SLM 9.40 to 17.70 93795~|~1~|~1~|~01/NFA~|~Replace Brdg structure 4404742Project Termini: Located 4.17 miles north of SR217 on SR775. Project Description: It is proposed to replace the structure w/a 4 sided precast box. 100% State01/NFA/BR/State 117810~|~1~|~1~|~01/STR~|~All work is included in this plan split. 103742~|~1~|~1~|~01/SAF~|~Add sidewalks and pedestrian countdown signals around intersections on priority corridors in Youngstown. Install bicycle racks near schools. 96599~|~1~|~1~|~01/BRO~|~The project will rehabilitate bridge JEF-213-1844 (SFN 4103270) by replacing existing non-composite box beam superstructure with a new composite box beam superstructure. Some profile adjustment is being performed to maintain vertical clearance over the railroad tracks. The approach slabs will be replaced. 94754~|~1~|~1~|~01/SAF~|~Improve intersection of Southbound exit from I71 to eastbound SR126 by installing a signal and reconfiguring eastbound SR126 to separate traffic bound for I71 from eastbound SR126 traffic 122213~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR80-B 118522~|~1~|~1~|~01/MPO~|~Plan Split for MPO funded STBG scope 118522~|~1~|~2~|~02/MPO~|~Plan Split for MPO funded scope associated with sidewalk (Improvement Code 28: Facilities for Ped and Bike). 103901~|~1~|~1~|~01/NHS/MTVE~|~LP Small City Program - 4B97 (80% Federal) / TRC (15% 4BG7) / 4BG7 (5% Local) - See CAP Comments) - Reconstruction of SR 13 within the City of Mount Vernon from Franklin Street to Stump Street 83290~|~1~|~1~|~01/ENH~|~Phase One of reconstruction of Lock One removing foundation stones and replacing with a concrete foundation utilizing the TE funding. 83290~|~1~|~2~|~02/NFA~|~Funding split to cover overage of TE funding on reconstruction at Lock One in the Village of Lockington. 79893~|~1~|~1~|~01/STR~|~HIG SR 73 14.96 - 15.34 @ Prospect RoadOther plan split for safety issues at intersection. 80 Fed/20 State01/STR/PV/State 116970~|~1~|~1~|~01/NHS~|~Plan Split to program project. Update when final scope of work is known. 104258~|~1~|~1~|~01/NFP~|~MOWING 110715~|~1~|~1~|~01/STR~|~All work in the plan split using district allocations. 117228~|~1~|~1~|~01/CMQ~|~Primary plan split for CMAQ eligible items. 117228~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope, such as water main replacement. 116373~|~1~|~1~|~01/SAE~|~Upgrading signals to include flashing yellow arrows on Hilliard Rome Road and Roberts Road 98523~|~1~|~1~|~01/BRF~|~District Preservation Program funds. Off system bridge funds. SR 330 is a Minor Collector. 92009~|~1~|~2~|~02/BRO~|~Portal Repair 92009~|~1~|~1~|~01/BRO~|~Major Bridge Funds 80418~|~1~|~1~|~01/IMS~|~Plan split for all pavement work, no added capacity. 80418~|~1~|~2~|~02/IMS~|~Plan split for all bridge work, no added capacity 80418~|~1~|~3~|~03/IMS~|~Split for all pavement work with added capacity 80418~|~1~|~4~|~04/IMS~|~Split for all bridge work with added capacity 80418~|~1~|~6~|~06/NFP~|~Split for on-going services. 80418~|~1~|~5~|~05/NFA~|~Split for consultant inspection services 80418~|~1~|~7~|~07/NFP~|~Split for crash repair work on the NB I-271 bridge over Miles Rd 80418~|~1~|~8~|~08/IMS~|~Split for replacing the existing structure over Bedford Road with a totally new structure. 80418~|~1~|~9~|~09/IMS~|~Split for the new structure as part of the NB I-271 slip ramp to Broadway Ave 109971~|~1~|~1~|~01/STR~|~BRO 50 4.49 SFN0800511 Bridge replacement 108553~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 9.80-9.84. DSR MOE-024. OH2018-1. Funded 100% federal. 88134~|~1~|~1~|~01/IMS~|~add missing movements at sr126 interchange, wb to nb and sb to wb. 92676~|~1~|~1~|~01/S>2~|~Resurfacing of CR-244 from Mount Pleasant to Railroad tracks. 94384~|~1~|~1~|~01/STR~|~General System Resurfacing 94384~|~1~|~2~|~02/STR~|~Bridge Work: CRA-100-20.75, CRA-100-25.19, CRA-19-23.63 98253~|~1~|~1~|~01/IMS~|~01/IMS/BR/ : PLan Split 1 for Mus-70-1142, Mus-70-11-1142 E 121905~|~1~|~1~|~01/ENH~|~Bridge replacement project. Hune Covered Bridge WAS TR 921 00.50 (SFN 8433720). Funded 95% Federal/5% Local. 122445~|~1~|~1~|~01/IMS~|~Reduce culvert outlet scour and stabilize the slope below the roadway 110038~|~2~|~4~|~04/S5K~|~Plan Split for Urban Paving funded work within City of Napoleon. 110038~|~2~|~5~|~05/S5K~|~Split for 100% locally funded aspects of Urban Paving work in Napoleon, such as full depth pavement repairs. 110038~|~1~|~3~|~03/STR~|~All work associated with bridge HEN-109-1876 110038~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SR-108 from SLM 18.726 to 22.73 and SR-109 from SLM 0.00 to 4.01, 16.58 to 19.255 110038~|~1~|~2~|~02/S5K~|~Plan split for resurfacing on SR-108 from SLM 17.619 to 18.726 122182~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded enhanced crossings. 110213~|~1~|~1~|~01/SAE~|~Rebuild the existing signals at the SR 747/Muhlhauser Rd and SR 747/Port Union Rd intersections. 114610~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance 114610~|~1~|~2~|~02/NFP~|~ITS Plan Split 108627~|~1~|~1~|~01/NFP~|~Wood County officials are proposing major improvements to Tracy Road both 1,650? north and south of SR795 that would include widening and realigning the road and signal modifications at the intersection 96080~|~1~|~1~|~01/NHS~|~District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3000362 GUE-US22-17.01 Intersect: Us 22 Over Salt Fork Creek; Not BR Eligible for Rehabilitation: Length=165 SD/FO(0) SR=99.1 DSR=6; GUE-US22-15.12 Intersect: Over Beeham Run; Not BR Eligible for Rehabilitation: L = 125, SD/FO = 0, SR = 99.1, DSR = 7 99010~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - ODNR Parks Project - 4BF7 (100% State) - No CAP - Replacement of 27 drain pipes at various locations within Salt Fork State Park. 87028~|~1~|~1~|~01/SAF~|~Maintenance contract for highway lighting in District 8 for FY2014. This plan split is for work in District 8. 87028~|~1~|~2~|~02/SAF~|~Maintenance contract for highway lighting in District 7 for FY2014. This plan split is for work in District 7. 111306~|~1~|~1~|~01/MPO~|~Stebbins to Prouty - MPO funded plan split 111306~|~1~|~2~|~02/SAE~|~Prouty to Western - Plan Split for 100% Safety funded scope items to enhance pedestrian and bike related improvements between Western and Prouty. 92424~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 119386~|~1~|~1~|~01/S>2~|~Safety and pedestrian Improvements 116714~|~1~|~1~|~01/NFP~|~Culvert replacements and repairs. 85109~|~1~|~1~|~01/NHS~|~general system resurfacing; HAS-250-14.04 to 17.73 107697~|~1~|~2~|~02/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds. 107697~|~1~|~1~|~01/STR~|~Resurfacing in Defiance County. All resurfacing in this project is in this plan split. Funding is district preservation funds (80% 4PF7 and 20% 4PS7). No local funds 98398~|~1~|~1~|~01/S5K/GENE~|~Resurfacing, urban paving in the City of Geneva. 98398~|~1~|~2~|~02/S5K~|~Resurfacing. 98398~|~1~|~3~|~03/STR~|~Resurfacing. 98398~|~1~|~4~|~04/IMS~|~Minor bridge work. 98398~|~1~|~6~|~06/STR~|~Bridge preventive maintenance. 98398~|~1~|~5~|~05/S5K~|~Bridge preventive maintenance. 81468~|~1~|~1~|~01/STR~|~REhabilitate Bridge CLE-756-0013. Replace concrete deck and provide pier protection. 107119~|~1~|~1~|~01/SAF~|~Work eligible for safety funding 100866~|~1~|~2~|~02/STR~|~SCI 140 6.84-11.42 100866~|~1~|~1~|~01/S<2~|~SCI 140 0.60-6.84 88722~|~1~|~1~|~01/CMQ~|~State Route 63 from Yankee Road to Gateway Blvd. OKI Project involves installation of a traffic responsive signal system with traffic management capabilities including: interconnection of signals via fiber optic cable, video detection, emergency vehicle pre-emption, PTZ cameras, LED signals, illuminated street name signs, and pedestrian improvements. 114227~|~2~|~2~|~02/NFP~|~RPM replacements. 114227~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. 97490~|~1~|~1~|~01/SAF~|~Pavement marking project with centerline and edge line striping. Various routes and sections in Athens County. Funded 100% federal. 117486~|~1~|~1~|~01/IMS~|~Created plan split 1 as a place holder since this project is early in development 84489~|~1~|~5~|~05/BRO~|~Split for work relocating Windstream. 84489~|~1~|~4~|~04/BRO~|~Split for work relocating Time Warner Cable. 84489~|~1~|~2~|~02/BRO~|~Split for work relocating the Fibertech Networks utility. 84489~|~1~|~3~|~03/BRO~|~Split for work relocating the Cox Communications utility. 84489~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. 120805~|~1~|~1~|~01/S5K~|~Paving inside the city. 122203~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-D 113154~|~1~|~1~|~01/ENH~|~Replacement of sidewalks on Marion Street in the Village of Chesterhill. Work includes the construction of ADA compliant curb ramps, light fixtures and other enhancements. TAP funded 95% Federal (15% TRC) and 5% Local. 106295~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties. 121197~|~1~|~1~|~01/S5K/ASHT~|~Pavement reconstruction. 101304~|~1~|~1~|~01/S<2~|~Madison St in Port Clinton 101304~|~1~|~2~|~02/NFP~|~Water and Sanitary lines. 110925~|~1~|~1~|~01/SAF~|~Improve SR 3 by resurfacing, widening, and restriping between Minerva Park Rd and Corporate Dr. 110925~|~1~|~2~|~02/S>2~|~Items associated with resurfacing SR3 North of Minerva Lake. 87215~|~1~|~1~|~01/BRF~|~"01/BRF/BR/GUER" - Guernsey County bridge replacement project on TR364 over Wills Creek. CEAO federal max of $1,770,400 101742~|~1~|~1~|~01/STR~|~Resurfacing project of HOC CR 33A 3.97-5.17. Work includes storm water utility improvements. Funded 95 federal/5 local. 105618~|~1~|~1~|~01/STR~|~LUC-295 plan split 105618~|~1~|~2~|~02/BRO~|~Plan Split for LUC-295-2371 bridge 101738~|~1~|~1~|~01/STR~|~Culvert replacement HIG 28 9.25 116301~|~1~|~1~|~01/NHS~|~Chip seal in JAC. 75911~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2013 91021~|~1~|~1~|~01/SAE~|~Guardrail repair various locations 117015~|~1~|~1~|~01/MPO/CIN~|~Construction of sidewalk on the south side of Dutch Colony Drive from Winton Road to Winton Ridge. 107844~|~1~|~1~|~01/NFP~|~Work on various culverts. District preservation funds. 107844~|~1~|~2~|~02/NFP~|~Work on a culvert that meets the state but not the federal definition of a bridge. District preservation funds. 105251~|~1~|~1~|~01/NHS~|~Plan split for bridge painting work. 86764~|~1~|~1~|~01/SAF~|~Install sidewalks along Euclid from Sycamore Hills to Camargo: and on Thomas from Euclid to Dee, and education/encouragement programs for the SRTS program. 93962~|~1~|~2~|~02/NHS~|~Signal replacement project. Replacement of poles, signal heads, pavement loops, wiring, etc. Signals: GAL 7 25.99, GAL 7 26.07, GAL 7 26.28, WAS 7 25.87, WAS 7 27.01, WAS 60 2.76. Flashers: MOE 7 15.80 and MEG 7 3.71. NHS route funded 80 federal/20 state. 93962~|~1~|~1~|~01/STR~|~Signal replacement project. Replacement of poles, signal heads, pavement loops, wiring, etc. Flashers: WAS 339 8.57 and VIN 56 3.21. Rural other federal aid funded 80 federal/20 state. 93962~|~1~|~3~|~03/S<2~|~Signal replacement project. Replacement of poles, signal heads, pavement loops, wiring, etc. Signals: ATH 682 5.10 and ATH 682 5.82. Urban other federal aid funded 80 federal/20 state. 113849~|~1~|~1~|~01/BRF~|~All work is in this plan split. 80% federal until the cap is reached. Pauling County will provide the 20% match and all funds after the cap is reached. 121299~|~1~|~1~|~01/S5K~|~All work is within this split 92130~|~1~|~1~|~01/STR~|~resurface HEN US 6 17.24-24.55 - about SR-110 to McClure corp line 92130~|~1~|~2~|~02/STR~|~HEN-65-17.09 to 20.19 92130~|~1~|~3~|~03/STR~|~Variuos bridges on US-6 92130~|~1~|~4~|~04/STR~|~Bridges on SR-65 113005~|~1~|~1~|~01/S>2~|~Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the deck, bearings, and painting the structural steel. 111338~|~1~|~1~|~01/MPO~|~Split for resurfacing work using MPO funding 93569~|~1~|~1~|~01/NFA~|~Demolition of the rear of the annex building at the district complex. Radio Room area. 105446~|~1~|~1~|~01/NFP~|~Microsurfacing LOR SR 58/ ERI SR 60 / SR 301 105446~|~1~|~2~|~02/NHS~|~Microsurfacing LOR-SR-57 112551~|~1~|~1~|~01/NHS~|~Plan Split for the resurfacing of US 52 94293~|~1~|~1~|~01/S<2~|~Replace signals at the intersections (3) of SR-747 with Fountain Avenue, Sharon Road, and Washington Avenue. 114737~|~1~|~1~|~01/NHS~|~FY 25 Overlay 88489~|~1~|~1~|~01/SAE~|~100% SRTS funding up to federal max to construct sidewalks 124042~|~1~|~1~|~01/NHS~|~Resurfacing work on Berea Freeway from Sheldon to Eastland 101839~|~1~|~1~|~01/SAF~|~Guardrail placement project using CSTP funds. 100% Federal. 115344~|~1~|~1~|~01/SAE~|~USBR signage installation along USBR 25 and 30 119414~|~1~|~1~|~01/NFA~|~CEAO LBR bridge replacement 111309~|~1~|~1~|~01/BRF~|~Guernsey County Engineer project to rehab bridge GUE-CR33-0.70 (SFN 3033880). 4C87 - See Cap comments 105577~|~1~|~1~|~01/STR~|~The rural portions of MAR 309, MRW 61, MRW 95AC and MRW 95 and the associated bridges 105577~|~1~|~2~|~02/NHS~|~Urban Portion of MAR-309 and MAR-95 and the associated bridges 99846~|~1~|~1~|~01/MPO~|~Fudning to cover construction costs of signal interconnect installation at 19 locations in New Albany. 122191~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-74-A 96693~|~1~|~1~|~01/NHS~|~Plan Split for the items paid at 80% ODOT and 20% City. This includes SR 264 between SLM 8.9-10.62 inside the City. Items of work should include planing, new asphalt, and final striping. 96693~|~1~|~2~|~02/NHS~|~Plan split for items of work paid for at 100% City costs. This includes SR 264 between SLM 8.9-10.62 inside the City. Items of work included in this split are pavement repair, curbs, curb ramps, and temp. striping. 112805~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span. 112805~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 45 from 15.27 to 17.39 and ATB SR 307 from 3.22 to 8.49. 123493~|~1~|~1~|~01/NFP~|~FY31 guardrail. 117595~|~1~|~1~|~01/NFA~|~Bridge replacement project .MEG TR 109 0.58, SFN 5342554 and MEG TR 126 0.58, SFN 5342600. Funded 100% Federal. 114580~|~1~|~1~|~01/NFA~|~Landslide repair project. VIN 356 1.34. Work includes drilled shaft wall. 112285~|~1~|~1~|~01/BRF~|~Bridge replacement on ADA-101-1.39 (SFN 0134775).This is a Ohio Bridge Partnership Program project. 84600~|~1~|~2~|~02/S<2~|~Resurfacing of SR164. State Route 164 from 0.00 to 0.66. 84600~|~1~|~3~|~03/S<2~|~100% Local items requested by the City of Columbiana. 84600~|~1~|~4~|~04/STR~|~Miscellaneous bridge work to eight rural structures. 5003121 District 4 SMAHSR00164**C : 5003156 District 4 SMAHSR00164**C : 2.850 5003431 District 4 SMAHSR00165**C : 5.780 5003482 District 4 SMAHSR00165**C : 9.030 5003520 District 4 SMAHSR00165**C : 9.130 5003555 District 4 SMAHSR00165**C : 11.5005003571 District 4 SMAHSR00165**C : 11.700 5003601 District 4 SMAHSR00165**C : 14.440 84600~|~1~|~1~|~01/STR~|~Resurfacing of SR164/165/14T. State Route 164 from 0.66 to 4.07. State Route 165 from 5.46 to 16.64. State Route 14T from 0.00 to 0.91. 113936~|~1~|~2~|~02/NFA~|~Resurfacing the loop driveway and parking area of the Parry Park Museum in Woodsfield. Monroe County Park District. 113936~|~1~|~1~|~01/STR~|~Asphalt overlay resurfacing. MOE 537 0.00-2.69, MOE 800 17.92-26.04, NOB 83 4.55-6.74 and GUE 83 0.00-0.71. Funded 80 Federal/20 State. 113936~|~1~|~3~|~03/SAF~|~Safety widening on NOB 83 4.55-6.74 and GUE 83 0.00-.71. Safety funded 90% Federal/10% State. 116866~|~1~|~1~|~01/S5K~|~Resurfacing 119669~|~1~|~1~|~01/IMS~|~Split for ramp work 119669~|~1~|~2~|~02/IMS~|~Plan split for preventative maintenance work on ramp bridge during pavement rehab 103962~|~1~|~1~|~01/STR~|~Place epoxy overlay on deck of PIC-361-4.31 95607~|~1~|~1~|~01/CMQ~|~MORPC CMAQ & STP & Columbus funding for widening of Lazelle Rd from Sancus to WG 87121~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a microsurfacing treatment. GAL US 35 0.00-3.80. Rural other federal aid funded 80 federal/20 state. 99896~|~1~|~1~|~01/MPO~|~Resurfacing of W Main St from 195' west of Bonnieview to Union Ave (SR 183). 109099~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 7.32. 100% state ER funded. 102275~|~1~|~1~|~01/SAE~|~Various county routes. 100843~|~1~|~1~|~01/STR~|~ADA 136 20.40-25.14ADA 247 18.17-23.98 100843~|~1~|~2~|~02/STR~|~Bridge PM. 102273~|~1~|~1~|~01/STR~|~Concrete overlay and deck edge repair on NOB 145 0.79, SFN 6101771. Work also includes concrete overlay on NOB 145 2.87, SFN 6101801. Rural other federal aid funded 80 federal/20 state. 100801~|~1~|~1~|~01/IMS~|~Rehab bridge with concrete overlay, barrier and decorative fence alternative. 123807~|~1~|~1~|~01/NHS~|~nhs 106296~|~1~|~1~|~01/SAF~|~Construct an RCUT design at the intersection of US 127 & Kruckeberg RD. 98978~|~1~|~1~|~01/STR~|~CR-6 114415~|~1~|~1~|~01/NFA/HAS~|~Pavement rehabilitation project funded up to a maximum of $500,000 at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 112893~|~1~|~1~|~01/MPO~|~Construction of a shared use trail along a former rail corridor from just west of Marburg Avenue, eastward through Ault Park, and along Old Red Bank Road to tie into the existing Murray trail. 116666~|~1~|~1~|~01/NHS~|~added plan split. 81055~|~1~|~2~|~02/S>2~|~Resurfacing and re-striping of State Route 193 from Park Avenue to Lexington in the City of Youngstown, Mahoning County, Ohio. 81055~|~1~|~1~|~01/ENH~|~Enhancement items (median planter, etc.) associated with State Route 193, from Park Avenue to Lexington, in the City of Youngstown, Mahoning County, Ohio. 88524~|~2~|~3~|~03/STR~|~For enhancement work in downtown Pemberville on WOO-105 from 8.81 to 9.76 88524~|~1~|~2~|~02/STR~|~Bridges on OTT-51 @ SLM 0.22 and @ SLM 1.44 88524~|~1~|~1~|~01/STR~|~resurface OTT SR51 from 0.00 to1.42; WOO-SR199 from 6.24 to 6.81;and WOO-SR105 from 8.81 to 9.76. 107392~|~1~|~2~|~02/NHS~|~Split for HAS-9-17.05 location. 107392~|~1~|~1~|~01/STR~|~Split for HAS-9-0.15, HAS-9-15.53, and HAS-646-1.12 Locations 92687~|~1~|~1~|~01/STR~|~This split is for resurfacing on SR 67 from 1.58 to 15.00. This section of SR 67 is a rural non-NHS route outside any urban area. 92687~|~1~|~2~|~02/S<2~|~This split is for resurfacing on SR 67 from 15.00 to 15.07. This section of SR 67 is an urban section of a non-NHS route. It is inside the Kenton Urban Area but outside the City of Kenton. Therefore, there are no City of Kenton funds in this split. 116875~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing. 100099~|~1~|~1~|~01/NFA~|~Pavement full depth reclamation. MOE 26 23.96. Not on any federal aid system. Funded 100% state. 115290~|~1~|~1~|~01/NFP~|~Guardrail repair/replacement. 95250~|~1~|~1~|~01/NFP~|~Culvert replacements on TRU-SR5-34.04, TRU-SR88-6.92, and TRU-SR305-18.93, in Trumbull County, Ohio. 91400~|~1~|~1~|~01/STR~|~General System Paving and in rural func class areaFAY-62: 0.00-10.76 91400~|~1~|~3~|~03/S<2~|~WCH urban paving and in WCH urban func class areaFAY-62: 13.17-14.42FAY-62D: 0.00-0.95 91400~|~1~|~2~|~02/S<2~|~General sytem paving but in WCH urban func class areaFAY-62: 10.76-11.85, 14.42-14.55 103653~|~1~|~1~|~01/S<2~|~Mill and resurfacing within the City of Riverside. 114766~|~1~|~1~|~01/NHS~|~JAC 35 Double Micro 114766~|~1~|~2~|~02/NHS~|~Bridge PM. 102276~|~1~|~1~|~01/SAE~|~Various County roads. 101233~|~1~|~1~|~01/NHS~|~Resurfacing HEN 281 & WOO 65 9.91/19.33 101233~|~1~|~2~|~02/STR~|~Resurfacing HEN/WOO-281/65 124455~|~1~|~1~|~01/NFA~|~Created for TID Involvement. 116743~|~1~|~1~|~01/NFP~|~All work in this plan split using 100% state funds SAC 4PS7. 121829~|~1~|~1~|~01/NFA~|~installation of two EV charging stations at Metroparks VOA 91406~|~1~|~3~|~03/S<2~|~Plan Split for the section in the small urban area. This includes route PRE-40 between SLM 0-1.1 91406~|~1~|~1~|~01/STR~|~Plan split for the rural sections. This includes routes BUT-73 between SLM 4.65-7.32 and SLM 11.24-11.58, BUT-503 between SLM 0.97-6.05, CLE-131, GRE-42, PRE-35, and WAR-350 91406~|~1~|~2~|~02/S>2~|~Plan split for the sections inside the large urban areas. thse routesa re BUT-73 between SlM 9.89-11.24 and BUT-503 beween SLM 0.51-0.97 124860~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4. 116867~|~1~|~1~|~01/CMQ/WARR~|~Pedestrian bridge replacement in Packard Park over the Mahoning River. 87887~|~1~|~1~|~01/IMS~|~Extrusheet sign replacement project. NOB 77 0.00-18.92 and WAS 77 0.00-17.64. Funded 90 federal/10 state. 87887~|~1~|~2~|~02/NHS~|~Extrusheet sign replacement project. WAS 50 0.00-3.34. Funded 80 federal/20 state. 114128~|~1~|~1~|~01/IMS~|~Plan split for bridge deck replacement work 114325~|~1~|~1~|~01/BRF~|~Removal of existing overhead structure, not being replaced. 88178~|~1~|~1~|~01/ENH~|~Plan split for the intersection re-alignment work. 92615~|~1~|~2~|~02/IMS~|~Resurfacing of existing pavement 92615~|~1~|~1~|~01/IMS~|~Construct northbound CD lanes and ramp modifications 92615~|~1~|~3~|~03/SAF~|~Special pavement markings for MOT 114239~|~1~|~1~|~01/ENH~|~Build Construction funds 114239~|~1~|~2~|~02/ENH~|~Plan Split for 100% Locally Funded Scope Items 102951~|~1~|~1~|~01/STR~|~STP Rural eligible. 104004~|~1~|~1~|~01/NFA~|~The City will construct approx. 1,760 feet of two lane road within the Van Aken District Bounded by Warrensville Ctr Rd on the east, Farnsleigh Rd on the north and west and Chagrin Blvd on the south. 102705~|~1~|~1~|~01/NFA~|~Bridge repair on Non-Federal Aide bridge. 102705~|~1~|~2~|~02/STR~|~Bridge rehab on rural route bridge. 123227~|~1~|~1~|~01/STR~|~310' landslide repair on SR 556-3.98mm. 118610~|~1~|~1~|~01/NFA~|~Split 1 94676~|~1~|~1~|~01/IMS~|~Remove and replace left deficient structure with new structure. SFN 5503396, MIA 75 1901 L (Rush Creek) and SFN 5503426, MIA 75 1901 R (Rush Creek) 94676~|~1~|~2~|~02/IMS~|~paving to the North approach slab of the structures over 25A 94676~|~1~|~3~|~03/SAF~|~Wet reflective pavement markers. 94676~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 97306~|~1~|~1~|~01/NHS~|~Safety Funds-guardrail end treatment replacement on NHS routes.FAY-35, FRA-3, FRA-161, UNI-33 97306~|~1~|~2~|~02/NHS~|~District Preservation funding-other guardrail items upgrade on NHS routes.FAY-35, FRA-3, FRA-161, UNI-33 97306~|~1~|~3~|~03/IMS~|~Safety Funds-guardrail end treatment replacement on Interstate routes. PIC-71, FRA-670 97306~|~1~|~4~|~04/IMS~|~District Preservation funding-other guardrail items upgrade on Interstate routes. PIC-71, FRA-670 97306~|~1~|~5~|~05/STR~|~Safety Funds-guardrail end treatment replacement on STP routes. FAY-753, MAD-40, MAD-42, FRA-40, FRA-710, UNI-245 97306~|~1~|~6~|~06/STR~|~District Preservation funding-other guardrail items upgrade on STP routes. FAY-753, MAD-40, MAD-42, FRA-40, FRA-710, UNI-245 108372~|~1~|~1~|~01/MPO~|~Resurfacing of 2nd St SW from Hudson Run Road to Wooster Road, Wooster Road North and Norton Road in the City of Barberton, Ohio. 116412~|~1~|~1~|~01/IMS~|~FY 2028 drainage block PID. 87124~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay treatment. NOB IR 77 1.56-6.44 and WAS IR 77 0.00-6.63. Interstate maint. funds, Federal 90% and State 10%. 114564~|~1~|~1~|~01/NHS~|~Remove and replace median concrete barrier and highway lighting 110961~|~1~|~1~|~01/NHS~|~Resurfacing on the NHS system. 103802~|~1~|~1~|~01/NFA~|~The County is constructing improvements to CR 10 from SR651 to south of TR205. The roadway improvements will consist of approximately 6.5 miles of full depth reclamation on CR10. 114236~|~1~|~1~|~01/IMS~|~Building demo 94400~|~1~|~1~|~01/NHS~|~80/20 4PF7/4PS7 Resurfacing 94400~|~1~|~2~|~02/NHS~|~Bridge Repairs 107955~|~1~|~1~|~01/IMS~|~Landscape maintenance and upkeep at the I70/I75 interchange 117393~|~1~|~1~|~01/ENH~|~Sidewalk project utilizing TAP (4B37) Federal funds at 95%. 112714~|~1~|~1~|~01/NHS~|~Replace deck and paint MRW-095-8.12 98755~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 29 0.17, SFN 5342171. Not on any federal aid system funded 80 federal/20 local. 98755~|~2~|~2~|~02/NFA~|~PE Detail Design portion of Design/Build project MEG CR 29 0.17, SFN 5342171. Not on Federal-Aid System, utilizing SAC 4B87 (Local Bridge) at 80% rate and Local Match at 20% rate using TRC. Total = 100% Federal. 114571~|~1~|~1~|~01/STR~|~Microsurfacing 82972~|~1~|~2~|~02/IMS~|~For all bridge and approach work related to the following overhead structures: HAM-275-1684 (SFN 3116646), HAM-275-1819 (SFN 3116670), HAM-275-2016 (SFN 3111768), and HAM-275-2027 (SFN 3104710). 82972~|~1~|~1~|~01/IMS~|~Plane, repair, and pave a portion of IR 275 in Hamilton County from east of Colerain Ave. (SLM 16.19) to the ramps to Winton Road (SLM 21.47) Bridge project work for HAM-275-16.84/18.19. 110152~|~1~|~1~|~01/IMS~|~Paint bridge superstructure 110152~|~1~|~2~|~02/NHS~|~Paint bridge superstructure. 111796~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at Norton and Kropp/Grove City Road 102226~|~1~|~1~|~01/NHS~|~SR-2/SR-269 interchange ramp 98395~|~1~|~4~|~04/IMS~|~Work on MED-3 structures over I-71 and I-76 98395~|~1~|~1~|~01/S<2~|~Resurfacing MED-003-3.80 to 4.00 S<2 Urbanized Area 98395~|~1~|~2~|~02/STR~|~Resurfacing MED-SR3-4.00 to 8.03 Rural 98395~|~1~|~3~|~03/S>2~|~Resurfacing MED SR3 8.03 to 8.97 / 9.14 to 9.87 S>2 Urbanized Area 98395~|~1~|~5~|~05/SAF~|~Funding for center Line rumble stripes Outside of Seville and Medina. 109956~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 1.80. Funded 100% state ER funds. 93351~|~1~|~1~|~01/STR~|~General system paving of MAR-98: 0-17.17 101013~|~1~|~1~|~01/NFA~|~District Pavement Preservation Funding - 4PS7 (100% State) 101013~|~1~|~2~|~02/NFA~|~District Bridge Preservation Funding - 4PS7 (100% State) 98362~|~1~|~1~|~01/MPO~|~Resurfacing of Robinson Ave between Bridge West of Van Buren to 5th Street in the City of Barberton. 100965~|~1~|~1~|~01/STR~|~Landslide repair project. ATH CR 33B 1.57. DSR ATH-002. Funded ER, 80% Federal and 20% Local. 105641~|~1~|~1~|~01/BRO~|~Bridge blanket PID, locations TBD. 95788~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 11.05 99411~|~1~|~1~|~01/ENH~|~Construct bike lanes on SR 800 on both sides of the 28.44 bridge over the Tuscarawas River. 99411~|~1~|~2~|~02/STR~|~02/STR/OT Plan Split is for the Intersection Lighting related costs of the project. 80% 4PF7/20% 4PS7. 121519~|~1~|~1~|~01/SAF~|~Construct Roundabout at the intersection of CR 95 and CR 106 123758~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance work 99372~|~1~|~1~|~01/IMS~|~SFN 5501687, MIA-75-0043L & SFN 5501717, MIA-75-0043R on TR 42 Ginghamsburg Road - Remove microsilica concrete overlay and install new latex modified concrete overlay using hydrodemolition. Patch pier columns using anodes and SCC (self consolidating concrete). Seal columns with epoxy-urethane. 91946~|~1~|~1~|~01/IMS~|~100% State/Maint. Funds for 1 year 93163~|~1~|~1~|~01/STR~|~General system resurfacing of PIC-674: 0-1.22, FAI-674: 0-0.40, PIC-674: 1.22-10.93 119953~|~1~|~1~|~01/STR~|~added plan split. 98693~|~1~|~1~|~01/NFP~|~TR-22 bridge over Ohio Turnpike. 106366~|~1~|~1~|~01/IMS~|~Bridge deck sealing on various bridges in D7. 116198~|~1~|~1~|~01/BRO~|~Bridge replacements utilizing CEAO LBR (4B87) Federal Funds at 95% (including 15% CBP credit). 102108~|~1~|~1~|~01/SAF~|~Intersection Improvement - Restricted Crossing U-turn 102108~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 124705~|~1~|~1~|~01/STR~|~Plan split for deck sealing of federally eligible bridge 121065~|~1~|~1~|~01/S>2~|~Bridge Replacement on Cheshire Rd (SFN: 2134195) 113935~|~1~|~1~|~01/NFA~|~Created for J&C involvement 113935~|~1~|~2~|~02/NFA~|~Created for J&C involvement 85346~|~1~|~1~|~01/S<2~|~"01/<2/OT/CAMB" - City of Cambridge 93325~|~1~|~1~|~01/S<2~|~Intersections of SR159 & Kenworth Drive, and SR159, Claybourne Heights & Kenworth. Project Description: It is proposed to add a north bound lane on SR159, add a west bound thru-right turn lane on Kenworth Drive, add east bound lane on Adena Drive, and add a right turn lane into the right in right out diveway to Kenworth that is located across from Claybourne Heights. 91443~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 327 1101 (SFN 8202311). Rural other federal aid funded 80 federal/20 state. 100438~|~1~|~1~|~01/NHS~|~Deck Sealing Project. 108063~|~1~|~1~|~01/S>2~|~Bridge rehab on urban bridge. 111072~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster TID Funding - 4TM7 (100% State) - See CAP Comments - Installation of signal at SR 188 and Mill Park Drive/Delmont Road. 116469~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes. 102582~|~1~|~1~|~01/NHS~|~On US 127 from 7.03 to SR 116 at 8.54 102582~|~1~|~3~|~03/NFP~|~On SR 698 from SR 103 at 0.00 to CR 313 at 6.44 and on SR 330 in Hancock County from the north corporation limits of the Village of Vanlue at 1.26 to SR 568 at 3.00. 102582~|~1~|~4~|~04/S<2~|~Work on SR 568 in Hancock County from the east corporation limits of the City of Findlay to the Findlay Urban Area boundary at 4.40. Funds from the District Preservation Program budget. 102582~|~1~|~2~|~02/STR~|~Work on SR 103 in Hancock County from the ECL of Arlington at 12.42 to SR 37 at 16.96. Work on SR 568 in Hancock County from the Findlay Urban Area boundary at 4.40 to the Wyandot County line at 11.26. Work on SR 49 in Paulding County from the Van Wert County line at 0.00 to the south corporation limits of the Village or Payne at 5.79 and from the south corporation limits of the Village of Antwerp at 12.53 to the north corporation limits on the Village of Antwerp at 14.07. Work on SR 111 in Paulding County from SR 49 at 4.67 to the west corporation limits of the Village of Paulding at 11.16. Work on SR 115 in Putnam County from Broad Street in the Village of Kalida at 9.75 to SR 15 at 16.73.Work on SR 189 in Putnam County from SLM 8.53 to SR 12 at 11.58. Work on US 127 in Van Wert County from the Mercer County Line at 0.00 to 7.03. Funds from the District Preservation Program budget. 86696~|~1~|~1~|~01/STR~|~Brdg replacement. 3604209 HIG SR753 9.59 Intersect: Trib Of Plum Run0.33 mile south of TR310 (Dean Park Road) 80 Fed/20 State. 01/STR/BR/State 93157~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 6003699 MUS IR70 25.9 Intersect: 70 Under C55 Rix Mil Rd; BR Eligible for Rehabilitation: Length=346 SD/FO(2) SR=74.0 DSR=5 96212~|~1~|~1~|~01/STR~|~STP Rural 80/20 Fed/State MRW-229-0.72 5902584 84276~|~1~|~1~|~01/BRO~|~Replace existing concrete box structure (HOL-62-3104, SFN 3801578) with a new four-sided concrete box. 112325~|~1~|~1~|~01/SAF~|~Guardrail replacement project on various routes and sections in HOC Co. Funded 100% Federal. 109024~|~1~|~1~|~01/STR~|~The VILLAGE is constructing road improvements to support the expansion of a new Airstream manufacturing facility; specifically, located in the south east quadrant of SR274. The project shall include widening SR 274. to include a new 405' westbound turn lane and a new 335' eastbound right turn lane with semi-actuated signal will be added with side street stop bar detection on new drive to be constructed. 94022~|~1~|~1~|~01/STR~|~US42 - Intersection improvement - CEAO HSIP Funds 120094~|~1~|~1~|~01/S>2~|~Construct Roadway Safety, Bicycle, and Pedestrian Improvements 98661~|~1~|~1~|~01/IMS~|~Plan split for all work 98661~|~1~|~2~|~02/SAF~|~Signal work at the IR-90 EB exit ramp (SLM 17.28) to Chester Avenue in the City of Cleveland elgible for safety funding. 76798~|~1~|~1~|~01/IMS~|~100% UNFU plan split 76798~|~1~|~2~|~02/IMS~|~Plan split for pavement rehab 94083~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 86 from 0.00 to 3.33 117473~|~1~|~1~|~01/ENH~|~ADA sidewalk improvement 115894~|~1~|~1~|~01/NFA~|~Created for J&C involvement 96077~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Facility Project Land & Buildings Major New Program Construction LBN7 (100% State) - No CAP - For construction of a 200 ton Salt stroage building at the Old Washington Outpost 103432~|~1~|~2~|~02/NHS~|~Guardrail replacements/repair along SUM SR 21 from 12.00 to 21.44. 103432~|~1~|~1~|~01/IMS~|~Guardrail repair/replacements along SUM IR 77 from 15.50 to 17.50 and SUM IR 480 from 7.00 to 8.00 124639~|~1~|~1~|~01/IMS~|~Pavement replacement. 111119~|~1~|~1~|~01/SAF~|~Plan split for intersection work. 98115~|~1~|~1~|~01/STR~|~Asphalt milling and resurfacing in spot locations including pavement markings and pavement repairs. 99573~|~1~|~1~|~01/SAE~|~Upgrading pavement markings on various Medina County Roads. 117611~|~1~|~1~|~01/S5K~|~All work is included in this plan split. 92388~|~1~|~1~|~01/BRF~|~Preservation project on Bickham Covered Bridge in Logan County SFN 4633431 LOG CR 38 0.29 113096~|~1~|~1~|~01/STR~|~Resurfacing STA SR 619 from 7.36 to 14.74. 113096~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span. 116597~|~1~|~1~|~01/NHS~|~NHS Plan Split 108973~|~1~|~1~|~01/IMS~|~Repair over-height impact damage to bridge GRE-675-1600R which carries IR 675 over Yellow Springs Fairfield Road. 101359~|~1~|~2~|~02/NHS~|~100% City of Elyria Items (pavement repairs east of Station 17+00) 101359~|~1~|~3~|~03/SAF~|~Safety project road diet - Safety funds for traffic items (signing, pavement markings and signal work) throughout the entire project. 101359~|~1~|~1~|~01/NHS~|~NHS Urban Paving - 80/20 Fed/Local (paving work east of Station 17+00 except pavement repairs) 101359~|~1~|~4~|~04/SAF~|~Safety project road diet w/ 10% local match for pavement and roadway items on Cleveland St. 119378~|~1~|~1~|~01/S>2~|~Bike/Ped Improvements 115201~|~1~|~1~|~01/CMQ~|~Complete reconstruction of five traffic signals, installation of new traffic surveillance cameras at each location and relocation of exiting fiber optic signal interconnect cable underground. 91695~|~1~|~1~|~01/IMS~|~ Rehabilitate Structure PRE-70-0689L SFN 6800998 over Bantas Fork located 0.57 miles east of Pence Rd. (T-120) by replacing the Forward Abutment and Approach slab. 109220~|~1~|~1~|~01/NFP~|~Operations Chip Seal 2017 105688~|~1~|~1~|~01/NFP~|~All work is in this plan split. Uses 100% state funds from the district preservation budget using SAC 4PS7. 115602~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 84019~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 110721~|~1~|~1~|~01/NFP~|~All the work in the project. 123247~|~1~|~1~|~01/S5K~|~Raised Pavement Markers 100885~|~1~|~1~|~01/CMQ~|~Reconstruction of the existing intersections of Snider Road with Thornberry Court and Snider Road with Mason Road into single lane modern roundabouts. 81726~|~1~|~1~|~01/IMS~|~priority system minor rehab. of BEL-70-0.00 to 5.04; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking 100303~|~1~|~1~|~01/MPO~|~Construction of bike boxes 118590~|~1~|~1~|~01/STR~|~Plan Split 01/STR/OT/ - 100% State 83245~|~1~|~2~|~02/STR~|~Roundabout Lighting 83245~|~1~|~1~|~01/IMS~|~Normal Project Participation funded by two developers, then 629 funds, then Jobs & Commerce, then West Jeff SIB loan 98961~|~1~|~1~|~01/MPO~|~Tranist Multi-modal Facility 108981~|~1~|~1~|~01/ENH~|~Enhancement project of sidewalk replacement, parking construction, lighting, monument restorations, ADA modifications, way finding signs. TAP funded. 108981~|~1~|~2~|~02/S<2~|~100% City items. 110664~|~1~|~1~|~01/BRO~|~Backwall Repair for structure TUS-36-0091 (SFN 7900155). 110664~|~1~|~2~|~02/BRO~|~Plan Split for backwall repairs of structures TUS-250-1577 L&R. 106039~|~1~|~1~|~01/NHS~|~Slide repair along southbound Ridge Road between the Best Buy driveway and CSX railroad 124617~|~1~|~1~|~01/STR~|~Pavement Markings on Various Richland County Roads 94442~|~1~|~1~|~01/S<2~|~Bridge Repair - RIC-430-3.66 (SFN 7006152) 97487~|~1~|~1~|~01/STR~|~Culvert replacements of CFN 760620110 STA-62-1.98, CFN 760440100 STA-44-2.03, CFN 760930190 STA-93-7.85, CFN 761730050 STA-173-0.80, STA-183-10.71 96165~|~1~|~1~|~01/CMQ~|~Establishes a truck parking area at an abandoned weigh station off of JEF-7 at SLM 3.90 for northbound traffic. Includes Pavement, lighting, guardrail, and drainage. 113896~|~1~|~1~|~01/NFA~|~Created for J&C involvement 119151~|~1~|~1~|~01/S5K~|~Resurfacing for ATH-78-0.16-8.89, ATH-691-9.22-9.80 AND HOC-78-0.00-3.28 90464~|~1~|~2~|~02/BRF~|~Repair piers and replace deck on NOB 260 0187 (SFN 6103278). BR eligible off system funded 80 federal/20 state. 90464~|~1~|~1~|~01/BRO~|~Bridge rehabilitation project. Repair piers on NOB 285 1371 (SFN 6103871). BR eligible funded 80 federal/20 state. 115923~|~1~|~1~|~01/MPO~|~Resurface Bancroft and McCord 97638~|~1~|~1~|~01/SAF/Nort~|~New capacity and safety improvement on Cleveland-Massillon Road (CR-17), from Pleasant (SLM 8.42) to Weber (SLM 7.92), in the City of Norton, Summit County, Ohio. 97638~|~1~|~3~|~03/S>2/NORT~|~Construction of Sanitary Sewer along Cleveland Massillon Road in the City of Norton, Summit County, Ohio. 97638~|~1~|~2~|~02/MPO/NORT~|~Widening of CR-14 between Shannon (7.44) and Weber (7.92), in the City of Norton, Summit County, Ohio. 92123~|~1~|~1~|~01/NFP~|~100% state funding for all work 100848~|~1~|~1~|~01/STR~|~PIK 335 14.55-24.78 100848~|~1~|~2~|~02/STR~|~PIK 335 21.65 (SFN 6603092) 76989~|~1~|~1~|~01/BRO~|~Line existing corrugated metal pipe structure COL-14-0571 (SFN 1501356) with new structural liner. 78255~|~1~|~1~|~01/IMS~|~preventive maintenance treatment of TUS-IR-77, 0.16 MI. N OF SR 258 TO CR 23., pavement only 95409~|~1~|~1~|~01/S<2~|~Remove and replace existing overlay with new LMC using hydrodemolition. Place polymer modified expansion joint system on ends and epoxy inject veritcal cracks on pier walls on SFN 4601335 on Penn Central RR. Remove and replace existing LMC overlay with new LMC overlay using hydro-demolition, SFN 4604237 Houchins Ditch. 114460~|~1~|~1~|~01/STR~|~Resurfacing SR 83 111495~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Meigs County. Funded 100% Federal HSIP. 83054~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation Paving 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-US 40-28.58 to 29.39; 2) Mus-US 40-00.00 to 01.09; 3) Lic-US 40-29.39 to 30.14; 4) Mus-US 40-01.09 to 05.10; 83054~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation Paving 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on OFAH-Urban: 1) Mus-US 40-05.10 to 09.15 99891~|~1~|~1~|~01/CMQ~|~Extend existing Left Turn lane on West Maple Street from Main Street to Ream Avenue. 96676~|~1~|~1~|~01/NHS~|~Plan Split for the roadway work within the project. This includes mainline and all ramps within the project limits. 110909~|~1~|~1~|~01/SAF~|~Work to enhance the safety of sidewalks and crossings that is eligible for federal-aid 92990~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-SR 541-17.79 to 18.72 92990~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Cos-SR 541-08.73 to 17.79; 2) Cos-SR 541-23.63 to 29.48; 122225~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-80-G 94301~|~1~|~1~|~01/NFP~|~100% state funding participation 119774~|~1~|~1~|~01/SAF~|~Repair of sidewalks along SR 3 101337~|~1~|~1~|~01/STR~|~Bridge Rehab. 95873~|~1~|~1~|~01/NFP~|~Two year Mowing contract Districtwide D-2 116571~|~1~|~1~|~01/NFP~|~Created for J&C involvement 101095~|~1~|~1~|~01/NHS~|~BRO 68 15.35 103155~|~1~|~1~|~01/NHS~|~Funding Split for all work on or before July 26th is eligible for 100% federal reimbursement and shall be charged to this funding split. 103155~|~1~|~2~|~02/NHS~|~Plan split for all work completed on 7/26/16 or after and is only eligible for 80% federal reimbursement. 119010~|~1~|~1~|~01/BRF~|~Bridge rehabilitation work to replace superstructure only. 99196~|~1~|~1~|~01/NFA~|~Scioto County various routes guardrail. 108521~|~1~|~1~|~01/NHS~|~Drainage improvements on STA SR 43 in Canton Township, Stark County, Ohio. 120882~|~1~|~1~|~01/BRF~|~All work on CR 16 to replace the bridge 116616~|~1~|~1~|~01/STR~|~Rural plan split for resurfacing and resurfacing related items on PIC-22 115337~|~1~|~1~|~01/MPO/TALL~|~Resurfacing. 90983~|~1~|~1~|~01/MPO~|~Resurfacing CR68 in Trumbull County from 0.260 to 1.870 99559~|~1~|~1~|~01/SAE~|~01/SAE/OT - 100% federal 4HB7 funds 99559~|~1~|~2~|~02/SAF/HAS~|~100% local force account inspection 104061~|~1~|~1~|~01/STR~|~Rockfall remediation. 121336~|~1~|~1~|~01/STR~|~STP Rural plan split. 96942~|~1~|~1~|~01/NFA~|~Task order construction inspection 97112~|~1~|~1~|~01/BRF~|~The replacement of SFN0334766, 0333964, and 7031149. 97112~|~1~|~2~|~02/BRO~|~The replacement of SFN7033648 and 7033583. 110272~|~1~|~1~|~01/MPO~|~The walking surface, lighting, drainage, amenities, and connectivity of the existing pedestrian path are in need of improvement. 97086~|~1~|~1~|~01/BRF~|~The replacement of SFN# 5931347, 5930499, 5932521, 5932319, 5932831, 5930405. 106449~|~1~|~1~|~01/S<2~|~Replace existing failing roadway - MER CR 144 (Market Street) SLM 7.038 - 7.288. 113708~|~1~|~1~|~01/SAF~|~Rebuild the traffic signal at SR-235 and Dayton Yellow Springs Rd. 117048~|~1~|~2~|~02/S5K~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 9.488 to 10.005 117048~|~1~|~3~|~03/STR~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 5.224 to 9.488 117048~|~1~|~4~|~04/S50~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 3.023 to 5.224 (ONTARIO) RIC SR 314 3.020 to 3.023 North bound. 117048~|~1~|~1~|~01/S50~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 3.014 to 5.224 110953~|~1~|~1~|~01/SAE~|~12 school zone flasher 20 MPH sign upgrades, 74 pedestrian signals, 3 new pedestrian signals, 1 new HAWK signal and high visibility thermoplastic crosswalk markings as needed. 118245~|~1~|~1~|~01/MPO~|~Multi-use path along the south side of Millsboro - RCRPC funded 93850~|~1~|~1~|~01/ENH~|~Adding a turn lane at the Hamilton Street intersection. Project pavement will be 41 feet back of curb to back of curb and will consist of two 12 foot driving lanes and two 8 foot parking lanes. Project will also include a curb lawn with tree plantings and five foot sidewalks on both sides of the street. The curb lawn from Blackhoof Street to the first alley shall contain brick pavers. The project will incorporate new City street lighting consisting of light pole fixtures to mirror the lighting on East Auglazie Street. Driveway approaches shall be reconstructed. Five intersections are part of the proposed project of which the intersection radii will be reconstructed to allow for improved traffic flow. Also the installation of storm sewer piping, catch basins and manholes, and the addition of underdrains, and an outlet storm line and the replacement of water main, water services, and fire hydrants. Replacement of manhole and sanitary services. 118756~|~1~|~1~|~01/STR~|~added plan split. 118756~|~1~|~2~|~02/S5K~|~added plan split. 105092~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan Split 1 for Fai-188-19.05 to 24.53 105092~|~1~|~3~|~03/NFA~|~03/NFA/PV - Plan Split 3 for FAI-188-24.53 to 26.53 105092~|~1~|~2~|~02/S5K~|~Resurfacing within STP Urban segments outside of Lancaster 105092~|~1~|~4~|~04/S5K/LANC~|~Resurfacing within city of Lancaster 119061~|~1~|~1~|~01/IMS~|~Plan split for project to paint bridge HAM-275-3895 L/R that carries I275 over Fourmile Rd/Creek and HAM-275-4036 that carries I-275 over Sutton Rd. 92233~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work on this project is in this split. The funds are being provided by Central Office Facilities. 120596~|~1~|~1~|~01/MPO~|~Federal items. 124751~|~1~|~1~|~01/NFP~|~Repair of noise wall 117962~|~1~|~1~|~01/S50~|~Urban Paving 95521~|~1~|~1~|~01/STR~|~SHE 47 22.35 pave invert of existing 96" conduit and SHE 274 15.19 remove and replace the existing 90" x 78" conduit. 106503~|~1~|~1~|~01/S<2~|~Replace PRE-320-0200 and 0188 culverts. Repair PRE-320-0213 culvert. 104247~|~1~|~2~|~02/SAF~|~Work funded with safety program funds. The Safety funded portion of the project between Sixth St. and Center St. will include a road diet, bike lane and signal improvements. 104247~|~1~|~1~|~01/ENH~|~Construct multi-use paths, bike lanes, and shared lanes. Funding from the Transportation Alternatives Program. Funding is 95% federal with Toll Credit. The 5% not federal match is provided by the City of Findlay. All funds needed if the cap is exceeded will be provided by the City of Findlay. 97424~|~2~|~2~|~02/STR~|~SFN 7402465 97424~|~1~|~1~|~01/STR~|~Culverts on SEN-19 @ SLM 11.82 and 16.68; SR 101 @ 10.134 98487~|~1~|~1~|~01/NFA~|~District Preservation Program funds. 100% state funds. SR 294 is a Rural Minor Collector and not eligible for federal funds. 97568~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. WAR-MONTG-0011 (SFN: 8361029) in the Village of Carlisle, and Bridge No. WAR-HANOV-0005 (SFN: 8362165) in the City of Mason. 89168~|~1~|~1~|~01/IMS~|~All work for the auxiliary lane addition 104045~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement 100 federal 4HB7 on various routes. 94668~|~1~|~1~|~01/SAF~|~Install Roundabout at SR 83 and Smithville Western Road 105466~|~1~|~1~|~01/STR/FAY~|~Chip Seal 105466~|~1~|~2~|~02/STR~|~Chip Seal 90921~|~1~|~1~|~01/NHS~|~7201664 SAN US20 10.35 Intersect: Muddy Creek 101389~|~1~|~1~|~01/S<2~|~CO CO Contr 01 plan split created for the following routes: FRA-3-20.23-23.07/24.47-26.28 101389~|~1~|~2~|~02/S<2~|~CO CO Engr 01 plan split created for the following STP routes: FRA-3-20.23-23.07/24.47-26.28 95592~|~1~|~1~|~01/MPO/BDAM~|~All work in this project. Resurfacing including joint repair. MPO-STP funds. The non-federal funds will be provided by the Village of Beaverdam. 102147~|~1~|~1~|~01/STR~|~Bridge replacement SCI SR 348 6.92 (SFN 7305532) 121587~|~1~|~1~|~01/MPO~|~rehab of S. Detroit street from Miami Ave. to Southern Corp line 107823~|~1~|~1~|~01/STR~|~All routes except MAR-746 and bridges on those routes 107823~|~1~|~2~|~02/NFA~|~MAR-746 and associated bridges 115812~|~1~|~1~|~01/SAF/MCEO~|~CEAO HSIP Program - 4HB7 (100% Federal) - See CAP Comment -Project to install new or upgrade existing guardrail on various county routes in Muskingum County 100183~|~1~|~1~|~01/NHS~|~Work on Main Street from Woodley to Lima Avenue. NHS 114608~|~1~|~1~|~01/NHS~|~Double micro on JAC 32. 109663~|~1~|~1~|~01/S<2~|~Resurfacing SR 14T 106259~|~1~|~1~|~01/S<2~|~ER landslide repair. 116235~|~1~|~1~|~01/STR~|~Chipseal. 116235~|~1~|~2~|~02/NFA~|~Chipseal. 116235~|~1~|~3~|~03/STR~|~added plan split. 114554~|~1~|~3~|~03/NFA~|~Chip Seal 114554~|~1~|~2~|~02/STR~|~Chip Seal 114554~|~1~|~1~|~01/S5K~|~Chip Seal 79559~|~1~|~1~|~01/BRO~|~Replace bridge deck, repair and paint structural steel, and rehabilitate substrutures with minimal approach work on SFN 0601446 AUG SR 67 0345 on State Route 67 over Interstate 75. 113120~|~1~|~1~|~01/S>2~|~Split for resurfacing work. 112666~|~1~|~1~|~01/IMS~|~Overlay i-75 and i-676 with Fine Aggregate Polymer Modified Aggregate. 89221~|~1~|~1~|~01/SAE~|~100% Safety funding for ramp work01/SAE/OT/ 100975~|~1~|~1~|~01/STR~|~DSR# BEL-022 98051~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-SR 79-(16.87-33.10) 98051~|~1~|~3~|~03/S<2/NEWA~|~"03/S<2/PV/NEWA" - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP Resurfacing of: Lic-SR 79-(15.66-16.25) 98051~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-SR 79-(16.25-16.87) 121332~|~1~|~1~|~01/BRO~|~Plan split for all work associated with WIL-34-2722 bridge 103787~|~1~|~1~|~01/BRF~|~Plan split for Construction 124959~|~1~|~1~|~01/MPO~|~Resurfacing Mason Montgomery Rd 112509~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 94128~|~1~|~2~|~02/NHS~|~Bridge maintenance on SFN 7602464 STA US 62 24.00L over SR 43, SFN 7602499 STA US 62 24.00R over SR 43 94128~|~1~|~3~|~03/S>2~|~Bridge maintenance on SFN 7602529 STA US 62 24.86L over Nimishillen Creek and Wheeling and Lake Erie RR, SFN 7602553 STA US 62 24.86R over Nimishillen Creek and Wheeling and Lake Erie RR. 94128~|~1~|~4~|~04/NHS~|~Resurfacing STA US 62 from 24.02 to 24.06 94128~|~1~|~1~|~01/S>2~|~Resurfacing STA US 62 from 24.06 to 25.54 84965~|~1~|~1~|~01/STR~|~SCI SR140 9.22 & 9.48 On SR140, 0.17 miles north east of TR294 (Railroad Hollow Road). 0.07 mile NE of CR17 (Frederick Rd.) It is proposed to replace Structure number 7304447 & 7304412. 7304412 SCI SR140 9.22 Intersect: Stream 7304447 SCI SR140 9.48 Intersect: Stream 0.17 miles north east of TR294 (Railroad Hollow Road). 0.07 mile NE of CR17 (Frederick Rd.) Project Description: It is proposed to replace Structure number 7304447 & 7304412. 80 fed/20 state01/STR/BR/State 106879~|~1~|~1~|~01/NHS~|~CRA-598-1.54-3.49 106879~|~1~|~2~|~02/STR~|~CRA-598-3.60 to 5.10CRA-97-1.20 to 1.96 106879~|~1~|~3~|~03/S<2~|~CRA-598-3.49 to 3.60CRA-97-0.84 to 1.20 100681~|~1~|~1~|~01/STR~|~Spot paving on the general system 107837~|~1~|~1~|~01/NHS~|~Bridge painting. All work in this plan split. District Preservation Program funds. 119719~|~1~|~1~|~01/S5K~|~All work included in this split. 89266~|~1~|~1~|~01/S<2~|~A small City funded project to reconstruct Appian Ave HEN CR11 0-0.37 89266~|~1~|~2~|~02/S<2~|~This split is for Sanitary and Waletr line. 96081~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for Construction of a 1200 Ton Salt Storage building at the site of the existing Duncan Falls OP in Muskingum County 107340~|~1~|~1~|~01/NFA~|~D09 RPM FY2024 109748~|~1~|~1~|~01/STR~|~Single Course Chip Seal with Fog Seal 100597~|~1~|~1~|~01/STR~|~Costs to replace the bridge. 104636~|~1~|~1~|~01/MPO~|~Resurfacing Salt Springs Rd from SR 46 to MAH County Line. 117927~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-B 100126~|~1~|~1~|~01/IMS~|~Inspection 107534~|~1~|~1~|~01/NHS~|~Resurfacing COL-11 107534~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings 95213~|~1~|~1~|~01/SAF~|~100% SRTS funding up to funding cap for installation of bicycle racks 100603~|~1~|~1~|~01/STR~|~Major rehabilitation of TUS-212 from SLM 9.09 to 9.49 and TUS-800 from SLM 23.03 to 28.74 and SLM 29.14 to 34.91 100603~|~1~|~2~|~02/S<2~|~Major rehabilitation of TUS-800 from SLM 22.74 to 23.03 100603~|~1~|~3~|~03/STR~|~Detailed design costs for design-build contract. 100603~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 91816~|~3~|~2~|~02/S<2~|~Urban sytem resurfacing in the City of St. Clairsville; includes curb ramps and auxiliary pavement marking on BEL-40 and BEL-9. Also include drainage items for design of storm sewer on BEL-40 to correct spread problem. 91816~|~1~|~1~|~01/S<2~|~Urban system resurfacing in the City of St. Clairsville: includes pavement items and long line pavement marking on BEL-40-17.71 to 20.06 and BEL-9-14.62 to 16.07 103590~|~1~|~1~|~01/S>2~|~Installation of fiber optic interconnect cable along Kemp Road from Grange Hall Road to Hanes Road, reconstruction of the existing traffic signal at Kemp Road and Turnbull Road, signal head upgrades, installation of battery backup systems, video vehicle detection, controller upgrades, curb ramp upgrades to meet ADA requirements, and other safety improvements. 93855~|~1~|~1~|~01/NHS~|~Remove and replace existing overlays (Latex and Microsilica) with new latex modified concrete deck overlay system along with any necessary patching on: SFN 0602469 AUG 116 0132 over USR 33 and SFN 0600237 AUG 33 0419 over St. Mary's River. 113321~|~1~|~1~|~01/IMS~|~Pavement Replacement on IR 680, reconstruction of IR 680 ramps to and from MAH SR 711 and SR 193, includes culverts and lighting. 113321~|~3~|~4~|~04/NFA/MACE~|~Resurfacing of Lanterman Rd. 113321~|~3~|~3~|~03/IMS~|~Bridge preventive maintenance work. 113321~|~2~|~2~|~02/IMS~|~Lanterman Rd Bridge removal and cul-de-sacs. 116427~|~1~|~1~|~01/MPO/SHAR~|~Upgrades to traffic signals on four routes within the City of Sharonville. 116427~|~1~|~2~|~02/NFP/SHAR~|~Upgrades to traffic signals that are not warranted and therefore not eligible for federal funds. Funded locally by Sharonville. 115535~|~1~|~1~|~01/NFA~|~Created for J&C involvement 121327~|~1~|~1~|~01/NFA~|~Not on Federal Aid system Rural <5 121327~|~1~|~2~|~02/S>2~|~STP >200 Split 121327~|~1~|~3~|~03/S5K~|~STP >5 121327~|~1~|~4~|~04/STR~|~STP Rural Split 116304~|~1~|~1~|~01/S<2~|~Overlay project. 116304~|~1~|~2~|~02/STR~|~Overlay project. 119024~|~1~|~1~|~01/S>2~|~Plan split for bridge work. 116055~|~1~|~1~|~01/NFP~|~Plan split for pavement markings 120931~|~1~|~1~|~01/STR~|~WAS 339-8.57 Two Lane Resurfacing 120931~|~1~|~2~|~02/NFP~|~Resurfacing of the District 10 Traffic Building parking lot. Facilites funded. 100% State. 88785~|~1~|~1~|~01/STR~|~District Allocation 88785~|~1~|~2~|~02/S<2~|~Bridge Work - 80/20 District Allocation 124589~|~1~|~1~|~01/NHS~|~Major rehab of FRA US 23 from 0.00 to 4.02 106266~|~1~|~3~|~03/S<2~|~100% City of London plan split. 106266~|~1~|~4~|~04/S<2~|~Plan split for MAD-56-6.606 culvert. 106266~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAD-56-6.20-6.35, MAD-56-6.95-7.68 & MAD-38-13.15-13.45. 106266~|~1~|~2~|~02/S<2~|~Rural Portion of SR 56: MAD-56-6.35-6.95 106266~|~1~|~5~|~05/S<2~|~Storm sewer replacement along MAD-56 in ODOT D6 JURISDICTION. 87211~|~1~|~1~|~01/NHS~|~This split is for resurfacing the portion of the project which is on US 33 which is an NHS route. 87211~|~1~|~2~|~02/STR~|~This split is for resurfacing work on the portion of the project which is not on a NHS route. This is all the resurfacing on SR 49 and SR 81. The federal funds are rural STP. 108863~|~1~|~1~|~01/NFP~|~Roadwork improvements will also include the widening of SR40 to accommodate a right turn lane going west on SR40 and also a left turn going east on US-40 at the new SR-29 intersection. 114942~|~1~|~1~|~01/NHS/STRE~|~Resurfacing, urban paving in the City of Streetsboro. 108043~|~1~|~1~|~01/NFA~|~The City will construct a southbound left turn lane, 1305' on CR25A to the intersection of newly proposed east west roadway at the entrance into the industrial parkway. The southbound left turn lane will be 12' wide including base and wearing course. 118185~|~1~|~1~|~01/SAF~|~Safety funded plan split for roundabout 96127~|~1~|~1~|~01/NFA~|~Construct a new 3,000 ton salt storage building at the new Darke County Full Service Facility. 100663~|~1~|~1~|~01/STR~|~Bridge painting project. WAS 339 2012, SFN 8404380. Rural other federal aid funded 80 federal/20 state. 121001~|~1~|~1~|~01/IMS~|~Plan split for GRE IR 675 resurfacing 115626~|~1~|~1~|~01/IMS~|~MOWING 103711~|~1~|~1~|~01/IMS~|~Brent Spence Bridge along with approach spans 98532~|~1~|~2~|~02/NHS~|~FY2018 Urban Paving Project in the City of Fairfield. This plan split is for SR 4 where the pay items are 100% City. 98532~|~1~|~3~|~03/SAF~|~Safety work for removing the slip right turn lane from SR-4 to SR-4Bypass and making it a conventional right turn lane. 98532~|~1~|~1~|~01/NHS~|~FY2018 Urban Paving Project in the City of Fairfield. This plan split is for SR 4 where the pay items are split 80% State and 20% City. 114463~|~1~|~1~|~01/S<2~|~SLM 1.72 to SLM 2.56 114463~|~1~|~2~|~02/STR~|~SLM 2.56 to SLM 11.36 119097~|~1~|~1~|~01/S5K~|~Resurfacing. 119097~|~1~|~2~|~02/STR~|~Resurfacing. 92207~|~1~|~1~|~01/BRO~|~Raise superstructure to meet 16'6" clearance over IR 75. Remove and replace approach slabs, build up abutment beam seats, backwalls, and pier caps, and adjust ramp terminis to meet new SR 29 profile on SFN 7500157 SHE 75 1471 over Interstae 75. 96891~|~1~|~1~|~01/NFP~|~Resurfacing of Mosquito Creek State Park parking area. Trumbull County, Ohio. 91906~|~1~|~1~|~01/IMS~|~Interstate Plan Split:FAY-71-0.00-9.45 88333~|~1~|~1~|~01/SAE/LANC~|~"01/SAE/OT/LANC" - Safety Funds 4SC7 (80% Federal) / 4BG7 (20% Local) - CAP Funding capped at $584,819 ($728,000 minus $89,338 Env minus $13,875 Dtl Dsgn minus $39,968.00 On-Going) TRC Authorized up to 4SC7 CAP - City of Lancaster SRTS project involving the addition and replacement of sidewalk on various city streets. 88333~|~1~|~2~|~02/SAE/LANC~|~"02/SAF/OT/LANC" - SRTS 4SC7 (80% Federal) / 4BG7 (20% Local) -CAP Funding capped at $39,968 TRC Authorized up to 4SC7 Max - Ongoing Engineering during Construction on the City of Lancaster's SRTS project. 107903~|~1~|~1~|~01/STR~|~SLM 4.52 to SLM 10.08 107903~|~1~|~2~|~02/BRO~|~Plans split for bridge costs 97840~|~1~|~1~|~01/BRO~|~OBPP Replacement of SFN 0730483 97840~|~4~|~4~|~04/BRF~|~OBPP replacement of SFN 0731625 97840~|~2~|~2~|~02/BRF~|~OBPP replacement of SFN 0732648 97840~|~3~|~3~|~03/BRF~|~OBPP replacement of SFN 0732303 92583~|~1~|~1~|~01/MPO~|~Multi use trail. 117008~|~1~|~1~|~01/SAF~|~Plan split for demolition 109418~|~1~|~1~|~01/STR~|~work to resurface Taylor Wells Rd (CR-28) that is eligible for federal-aid 124783~|~1~|~1~|~01/NHS~|~Plan split for Conduit Rehab. 120402~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established 120730~|~1~|~1~|~01/SAF~|~signal upgrades at various locations in the City of Mason 119757~|~1~|~1~|~01/SAF~|~Installation of sidewalk along a portion of Loveland Madeira Rd within the City of Loveland. Project also includes a mid-block crossing with RRFB. 116628~|~1~|~1~|~01/STR~|~Chip Seal for various routes 124100~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing on STP Urban functional class 124100~|~1~|~2~|~02/STR~|~Plan Split for resurfacing in STP Rural functional classification 114568~|~1~|~1~|~01/STR~|~Chipseal on SCI 73 91738~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 733 0.00-0.25 Urban, Federal aid, 80% Federal and 20% State. 91738~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment. MEG 7 11.35-14.58. NHS route funded 80 federal/20 state. 116603~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items on FRA-270. 96778~|~1~|~3~|~03/S<2~|~HUR-61-20.56-23.76 WAY-3-8.67 to 9.07 96778~|~1~|~4~|~04/IMS~|~LOR-480-1.05 to 2.17 96778~|~1~|~2~|~02/STR~|~CRA-4-11.26 to 18.65/19.55 to 22.20 HUR-61-6.70 to 12.08/23.76 to 23.92 HUR-99-15.00 to 17.88 WAY-3-0.00 to 8.67 96778~|~1~|~1~|~01/NHS~|~HUR20-2.70 to 6.79LOR-2-8.01 to 11.14RIC-30-0.00 to 4.07WAY-3-9.07 to 10.15 122284~|~1~|~1~|~01/SAF~|~All work included in this split. 123929~|~1~|~1~|~01/STR~|~All work included in this plan split. 111724~|~1~|~1~|~01/STR~|~Slide repair along STA-SR 225 at 2.65. 102778~|~1~|~1~|~01/IMS~|~District wide mowing D07 FY18/19 102778~|~1~|~2~|~02/IMS~|~Mowing contract with D08 for Preble County FY18/19 86869~|~1~|~1~|~01/BRO~|~Replace the existing four sided box (COL-164-0980, SFN 1503979) with a new four sided box. The bridge carries SR 164 over branch of Little Beaver Creek. 122717~|~1~|~1~|~01/S>2~|~Plan Split for MPO STBG funded scope. 122717~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded project. 114176~|~1~|~1~|~01/NFP~|~Split for bridge steel repair work 96544~|~1~|~1~|~01/STR~|~Maintenance contract for SFY 2019 herbicidal spraying. 105830~|~1~|~1~|~01/NHS~|~Plan split 97118~|~1~|~1~|~01/BRF~|~SFN 8730008 SFN 8738793 SFN 8734895 SFN 8736766 SFN 8742650 115486~|~1~|~1~|~01/SAF/Cols~|~Construction of a pair of bump-outs, enhanced crosswalks, signage, and RRFBs at two intersections on Summit Street at 3rd Ave and 8th Ave 113316~|~1~|~1~|~01/MPO~|~Resurface approximately 15 miles of the Ohio Erie Trail with 1.5? asphalt, repair root pop areas, berm and stripe path. 113316~|~1~|~2~|~02/NHS~|~Plan split for the retroactive change order for fuel price adjustment. 83042~|~1~|~1~|~01/NHS~|~Resurfacing of MAH SR 11 from 8.46 to 16.19. 83042~|~1~|~2~|~02/NHS~|~See linked structures. 83042~|~1~|~3~|~03/IMS~|~See linked structures. 85096~|~1~|~1~|~01/NFP~|~This split is for state funds. 117188~|~1~|~1~|~01/NFA~|~D09 Overhead Flasher FY24. 115465~|~1~|~1~|~01/ENH~|~Trail (SUP) resurfacing and repair utilizing Federal TAP Funds at 95%. 84546~|~1~|~1~|~01/CMQ/Kent~|~Install coordinated signal system, add center median to restrict turns and discourage midblock pedestrian crossing, improve intersection at Lincoln Street and improve profile/grade of Summit Streets east of Lincoln Street intersection, in the City of Kent, Portage County, Ohio. 84546~|~1~|~2~|~02/CMQ~|~100% City funded items. 84546~|~1~|~3~|~03/MPO~|~MPO funding for Enhancement Items. 100661~|~1~|~1~|~01/NHS~|~100% City of Maumee funds 100661~|~1~|~2~|~02/NHS/Maum~|~LUC-US20 from SLM 18.62 to SLM 19.12 (federal/ Local) 95760~|~1~|~1~|~01/NHS~|~Plan split for resurfacing from SLM 12.84 to 17.878 122186~|~1~|~1~|~01/SAF~|~CEAO HSIP funding for roundabout 97984~|~1~|~1~|~01/IMS~|~Resurfacing BEL-470 with asphalt concrete; including asphalt concrete overlay, pavement repairs and pavement markings. 87266~|~1~|~1~|~01/NHS~|~PIK US23 0.00 - 8.37 102707~|~1~|~1~|~01/STR~|~This plan split is for Bridge replacement on rural route. 114065~|~1~|~1~|~01/SAF~|~Convert TWSC intersection to single-lane roundabout 114065~|~2~|~2~|~02/SAE~|~Convert TWSC intersection to single-lane roundabout. 120395~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 99510~|~1~|~1~|~01/S>2~|~US 68 to Springfield Corporation Limit - Rehabilitate the roadway and bridge on Springfield-Xenia Road. 119100~|~1~|~1~|~01/S>2~|~Resurfacing. 108167~|~1~|~1~|~01/NHS~|~ER event OH18-01. Landslide repair on ATH US 33 13.33 W, DSR ATH-006. NHS route funded 100% federal. 124456~|~1~|~1~|~01/ENH~|~Shared use path utilizing 100% Federal funds (TAP and Safety) up to Federal maximum. 98692~|~1~|~1~|~01/NFA~|~MOT SHPWB 20 (SFN 5761603) Shoup Mill Road bridge rehabilitation Rehabilitate existing 2-lane, 3-span plate girder bridge carrying westbound Shoup Mill Road over the Stillwater River. Replace existing reinforced concrete deck and approach slabs; investigate conversion of conventional abutments with sliding plate expansion joints to semi-integral design. Install pressure relief joints at ends of approach slabs if converted to semi-integral bridge. Patch deteriorated concrete surfaces on abutments and restore dumped rock channel protection at abutments. 96524~|~1~|~1~|~01/STR~|~Adding one extra lane in each direction 121584~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing. 95633~|~1~|~1~|~01/NHS~|~It is proposed to demolish the houses. 105348~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 7: Round 2 of repairs to the existing WHV including deck overlays, expansion joint repairs, concrete patching, beam painting, etc. 88214~|~1~|~1~|~01/BRF~|~Replace Broadway Street Bridge over Wolf Creek SFN 5760712 MOT MR**C 0.00 92624~|~1~|~1~|~01/MPO~|~Pavement Patching, Crack Sealing, Microsurfacing and Pavement Markings on North Street from Bever Street to Beall Avenue in the City of Wooster using Large City funds 92624~|~2~|~2~|~02/MPO~|~Added split for 100% local items. Curb Ramp, as per plan Type A and Curb Ramp, as per plan, Type C 105784~|~1~|~1~|~01/STR~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on OFAH-Rural routes 105784~|~1~|~2~|~02/NHS~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on NHS routes 105784~|~1~|~3~|~03/S5K~|~District Preservation Funding. 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on STP 5,000 - 49,999 routes 89367~|~1~|~1~|~01/STR~|~Slide repair 103418~|~1~|~1~|~01/S<2~|~Widening, resurfacing and enhancements on County Road in the City of Kettering. 103418~|~1~|~2~|~02/S<2~|~Widening, resurfacing and enhancements on County Road in the City of Beavercreek. 111605~|~1~|~1~|~01/STR~|~Profile correction to improve the stopping sight distance along SR 39 near an entrance to a landfill operation. 107373~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - District 5 Mowing contract on Interstate and Interstate look-a-likes 119176~|~1~|~1~|~01/NFP~|~Plan split for resurfacing parkways and parking lots in the Brookside & West Creek Reservations eligible for State Metropark funds. 119176~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% Local cost. 110714~|~1~|~1~|~01/NHS~|~Using district preservation allocations. 112653~|~1~|~1~|~01/MPO~|~Resurfacing of Painesville-Warren-State Rd from GEA County Line to SR 534. 96311~|~1~|~1~|~01/NFP~|~Type A emergancey to fix the pavement on I-75 due to an accident 96320~|~1~|~3~|~03/S>2~|~District Preservation Conduit Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of culvert located at LIC-40-5.796. 96320~|~1~|~4~|~04/STR~|~District Preservation Conduit Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP) - Rehabilitation of culvert at LIC-40-7.54. 96320~|~1~|~5~|~05/IMS~|~District Preservation Bridge Funding - 4PF7 (Federal 90%) / 4PS7 (State 10%) - No CAP - rehabilitation of the Fai IR 70 00.85 L & R structures 96320~|~1~|~1~|~01/S>2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Bridge Rehabilitation: 1) SFN 4502019, LIC-40-0.15 carrying US 40 over Blacklick Creek. Not BR Eligible for Rehabilitation: Length=18; SD/FO = (1); SR = 55.4; DSR =N ; 2) SFN 4502043, LIC-40-2.65 carrying US 40 over Sycamore Creek. Not BR Eligible for Rehabilitaion: Length=18; SD/FO = (0); SR = 72.1; DSR = N; 96320~|~1~|~2~|~02/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation on 4502078 LIC-40-6.80 Intersect: Over Ditch; Not BR Eligible: Length=17, SD/FO(0), SR=72.5, DSR= N; 109521~|~1~|~1~|~01/CMQ~|~Reconfiguring SR 82 and Howland Wilson Rd intersection. 114468~|~1~|~1~|~01/STR~|~Resurfacing SR 151 107263~|~1~|~1~|~01/NFP~|~Gas line replacement at W. Broad St 106927~|~1~|~1~|~01/SAE~|~BRO US 68 44.48 95002~|~1~|~2~|~02/NFP~|~All costs for the new pole building in Van Wert County. 95002~|~1~|~1~|~01/NFP~|~All costs for the new pole building in Hardin County. 95002~|~1~|~3~|~03/NFP~|~All costs for the new pole building in Defiance County. 101148~|~1~|~1~|~01/NFP~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide. 100390~|~1~|~1~|~01/IMS~|~"01/IMS/CV/ " - Districty Preservation Culvert Replacement - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Lic-TR 152-01.08 associated with SFN 4503066 (Lic-IR 70-05.67) 105596~|~1~|~1~|~01/IMS~|~IM funding for pavement reconstruction, no added capacity. Includes work on High St, Fulton St, and Livingston Ave 105596~|~1~|~2~|~02/IMS~|~IM funding for structure replacement, no added capacity: FRA-70-14.05C New SFN 2510024 (S High St over 70/71)" 105596~|~1~|~3~|~03/MPO~|~MORPC/Columbus funding for aesthetic enhancements on High St bridge caps 105596~|~1~|~4~|~04/IMS/Cols~|~Items to be paid with 100% City of Columbus funding 105596~|~1~|~5~|~05/ENH/Cols~|~Incremental items - Columbus to pay the difference above standard items including brick paver crosswalks, granite curb, light poles, luminaires, signal supports 105596~|~1~|~6~|~06/IMS/Cols~|~100% AEP items to be done as part of the project 105596~|~1~|~7~|~07/IMS/Cols~|~100% AT&T items to be done as part of the project 121823~|~1~|~1~|~01/MPO~|~Plan split for eligible resurfacing work. 83522~|~1~|~1~|~01/NHS~|~Construct Drainage system, including catch basins and paved gutter along SR7 in Duffy. MOE-7-11.50. NHS route funded 80 federal/20 state. 91622~|~1~|~1~|~01/IMS~|~Split for interstate locations - FRA-70, 71, 270, 670 91622~|~1~|~2~|~02/NHS~|~Split for NHS locations - UNI-33 98127~|~1~|~1~|~01/NHS~|~Rock hazard removal. WAS 7 42.40. Type A Emergency Project. Funded 100% state. 101866~|~1~|~1~|~01/NFA~|~ADA VAR CR 96795~|~1~|~1~|~01/STR~|~General System resurfacing of BEL-147 from SLM 13.23 to SLM 13.61 including pavement repairs and pavement markings. 96795~|~1~|~2~|~02/NFA~|~General System resurfacing of BEL-147 from SLM 13.61 to SLM 19.50 including pavement repairs and pavement markings. 23961~|~1~|~2~|~02/NHS~|~80/20 fed/state funding split for all bridge work. 23961~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 92126~|~1~|~1~|~01/STR~|~resurface FUL US 20A 3.01-12.06 and SR-66 from 7.09 to 8.73 92126~|~1~|~2~|~02/S<2~|~FUL US 20A 12.06-12.33 Urban Oth 92126~|~1~|~3~|~03/STR~|~Culverts on US-20A @ SLM 7.59 & SLM 10.46 92126~|~1~|~4~|~04/STR~|~Bridge on FUL-20A @ SLM 0.80 & FUL-66 @ SLM 8.53 92126~|~1~|~5~|~05/SAF~|~Plans split for Safety funds to install Centerline Rumble Strips 99374~|~1~|~1~|~01/STR~|~SFN 1900765, DAR-47-2044 on Bakertown Ditch-remove asphalt wearing surface and waterproofing from non-composite box beam single span structure. Install SDC hard overlay (non-composite) system. SFN 1901486, DAR-49A-0194 & SFN 1901516, DAR-49A-0238 on Painter Creek - remove asphalt wearing surface and water proofing from non-composite box beam structures. Install SDC hard overlay (non-composite) system. 91935~|~1~|~1~|~01/IMS~|~Delete temporary split. 88798~|~1~|~1~|~01/IMS~|~IR 71: From 3.62mi to 3.57 mi. South of the Clinton County line. Rehabiltate Bridges WAR-71-1866L/R by replacing the rigid overlay and performing other minor rehabiltation work. SFN 8302405 & 8302375. 114711~|~1~|~1~|~01/STR~|~Overlay on VAR routes. 114711~|~1~|~2~|~02/S<2~|~Overlay on VAR routes. 114711~|~1~|~3~|~03/STR~|~Bridge PM 114711~|~1~|~4~|~04/S<2~|~Bridge PM. 94977~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 124154~|~1~|~1~|~01/BRO~|~Plan split for bridge work on eligible system 107158~|~1~|~1~|~01/STR~|~Geological Site Management Funding - 4SF7 (80% Federal) / 4SS7 (20% State) - See CAP Comment - Rock scaling work on MUS SR 146 from the 31.42 to the 31.49. 107158~|~2~|~2~|~02/NFA~|~Geological Site Management Funding - 4SS7 (100% State) - See CAP Comments - Rock scaling work on MUS SR 340 from the 3.26 to the 3.32. 124502~|~1~|~1~|~01/NHS~|~Replace structure DEL-42-1.953 over the Scioto River with a wider structure. 100956~|~1~|~1~|~01/STR~|~Resurfacing. 105923~|~1~|~1~|~01/SAF/LCEO~|~Licking County Engineer HSIP Funding - 4HB7 (100% Federal) - See CAP Comment - Project to install new and upgrade existing guardrail on various county roads. 99192~|~1~|~1~|~01/NFA~|~Highland County Various Routes Guardrail 110325~|~1~|~1~|~01/STR~|~Landslide repair project on WAS SR 26 28.96. 100% State ER funds. 96834~|~1~|~1~|~01/BRF~|~Work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 80% federal funds from the County Engineers Association of Ohio (CEAO) and a 20% match provided by the Van Wert County Engineer. 95678~|~1~|~2~|~02/S<2~|~This plan split is for the items that are 100% City funded items on the Urban Paving project on W. Dayton Dr. 95678~|~1~|~1~|~01/S>2~|~Urban Paving in the City of Fairborn on W. Dayton Dr. which will be the relocated SR 444 once WPAFB closes the current SR 444. This plan split is for the items split between the State & City at 80/20. 100847~|~1~|~3~|~03/SAF~|~Pavement marking project for FY2021. Funded 100% state. 100847~|~1~|~1~|~01/IMS~|~Pavement marking project for FY2021 on Interstate routes funded 80% Federal/20% State. 100847~|~1~|~2~|~02/NHS~|~Pavement marking project for FY2021 on NHS routes funded 80% Federal/20% State. 110597~|~1~|~2~|~02/S<2~|~Urban Plan Split: MAR-309-14.50-15.35 110597~|~1~|~3~|~03/STR~|~Repair and asphalt overlay on several bridges 110597~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-309-0.00-14.50 119640~|~1~|~1~|~01/NFP~|~Task order PID for CE/INS 117407~|~1~|~1~|~01/SAF~|~Plan split for construction 117407~|~1~|~2~|~02/STR~|~Plan split for 100% local items not eligible for safety funding 91486~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. NOB 145 0.00-8.94, WAS 145 0.00-3.25, and WAS 555 7.71-19.41. Rural other federal aid funded 80 federal/20 state. 102986~|~1~|~1~|~01/STR~|~AC Overlay with repairs; Also include full depth removal and replacement on pavement approaches to bridge carrying SR 54 over I-70 102986~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 120879~|~1~|~1~|~01/CMQ/FAIR~|~OKI CMAQ funded construction of a shared use path project. 30% local match required. 81725~|~1~|~1~|~01/IMS~|~Priority paving on TUS Interstate 77 from SLM 20.73 to SLM 27.72 81725~|~1~|~2~|~02/NHS~|~NHS paving on TUS United States Route 250 from SLM 11.88 to SLM 12.79 81725~|~1~|~3~|~03/IMS~|~Project includes the rehabilitation of bridge TUS-250-1232R (SFN 7904835). The rehab work involves replacing the concrete parapet and the deck edges. 105463~|~1~|~1~|~01/IMS~|~AC Overlay with repairs on IR 70 from SLM 7.63 (west of Wilson Rd) to SLM 11.21 (US 40-Broad St) 105463~|~2~|~2~|~02/IMS~|~Repairs and deck overlay on several bridges 105463~|~2~|~3~|~03/IMS~|~Replace deck on structure FRA-70-10.17L (SFN 2504510) over harper Rd 105463~|~2~|~4~|~04/IMS~|~Repair of damage to FRA-70-10.17 R over Harper Rd due to a vehicle accident 117386~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 110322~|~1~|~1~|~01/MPO~|~Reconstruction of Monroe Street 93577~|~1~|~1~|~01/MPO~|~STP Resurface Coumbus Ave. 93577~|~1~|~2~|~02/MPO~|~TE Resurface Columbus Ave. 118971~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding 113340~|~1~|~1~|~01/S>2~|~Construction of a new sidewalk along West Stroop Road on the north side from Stonebridge Road to Ridgeway Road (no existing sidewalk in this section) 98909~|~1~|~1~|~01/S>2~|~Bennett St 124888~|~1~|~1~|~01/NHS/NFRA~|~Resurfacing. 86245~|~1~|~5~|~05/NHS~|~"05/NHS/PV/ " - District Preservation Paving 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Concrete pavement repair and replacement on LIC-16 RA 45079 between SR 13 and SR 13D 86245~|~1~|~7~|~07/ENH/NEWA~|~"07/ENH/BR/NEWA" Transportation Alternative Funding 4B37 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $550,000.00 4B37 - For various enhancements to the new bridge structure. 86245~|~1~|~1~|~01/NHS/NEWA~|~"01/NHS/OT/NEWA" - City of Newark Water & Sewer work 4PH7 (100% Local SIB Loan) - No CAP - Replacement of water and sewer lines. 86245~|~1~|~4~|~04/NHS/NEWA~|~"04/NHS/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Newark on Lic-SR 13-9.69-10.29 86245~|~1~|~2~|~02/CMQ/NEWA~|~"02/CMQ/PV/NEWA" - LCATS/City of Newark Funding 4TB7 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $2,500,000.00 4TB7 for Construction ? Roadway improvements to SR13/13D: Lic-SR 13D-00.00 to 00.31; Lic-SR 13-09.69 to 10.29; 86245~|~1~|~6~|~06/ENH/NEWA~|~"06/ENH/OT/NEWA" - Transportation Alternative Funds for Pedestian Additions 4B37 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $785,000.00 4B37 - Construction/installation of sidewalks, signals, ADA ramps, lighting and various traffic calming items. 86245~|~2~|~8~|~08/NHS/NEWA~|~"08/NHS/PV/NEWA" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Newark on Lic-SR 13-10.29 to 11.89; 86245~|~1~|~3~|~03/CMQ/NEWA~|~"03/CMQ/BR/NEWA" - LCATS/City of Newark Funding 4TB7 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $2,500,000.00 4TB7 for Construction Phase? Bridge replacement of SFN 4500660 SR 13D Bridge over SR 16: BR Replacement Eligible: Length = 172; SD/FO = 1; DSR = 6; SR = 50.0 110402~|~1~|~1~|~01/STR~|~Resurfacing SR 39 98784~|~1~|~1~|~01/SAF~|~Widening of Princeton Road to provide 11 foot lanes and 5 foot paveed shoulders between Jayfield Drive and SR-747. Also installation of edge line rumble strips. 114471~|~1~|~1~|~01/NFA~|~Resurfacing SR 646 96511~|~1~|~1~|~01/NFP~|~GES contract for paint inspection. 110867~|~1~|~1~|~01/SAF~|~Plan split for all roundabout construction 89427~|~1~|~1~|~01/NHS~|~Pruning, Tree/Bush Removal 92841~|~1~|~1~|~01/BRO~|~Bridge Replacement 92841~|~2~|~2~|~02/STR~|~Plan Split for roadway work 100894~|~1~|~1~|~01/STR~|~ROS-327-2.46 Bridge replacement 112568~|~1~|~3~|~03/MPO~|~Plan split for Urban portion of federally eligible expenses in construction and CE from SAC 4TA7 (NOACA) 112568~|~1~|~1~|~01/MPO~|~Plan split federally eligible expenses of the rural portion of project using Urban Paving funds. 112568~|~1~|~2~|~02/MPO~|~Plan split for federally eligible expenses of the urban portion of project eligible to be paid using Urban Paving funds. 104683~|~1~|~1~|~01/NFP~|~JAC CR VAR Guardrail FY22. 121612~|~1~|~1~|~01/MPO~|~Plan Split for Carbon Reduction Program funded scope. 123223~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items 114324~|~1~|~1~|~01/IMS~|~Resurfacing. 119053~|~1~|~1~|~01/STR~|~All work included in this split. 121314~|~1~|~1~|~01/NHS~|~added plan split. 121314~|~1~|~2~|~02/SAF~|~added plan split for safety funds. 114795~|~1~|~1~|~01/NFA~|~Routes being chip sealed by Operations 86994~|~1~|~1~|~01/BRO~|~Replace existing multi-span presstressed concrete box beam bridge (COL-154-1404, SFN 1503723) with a new three-span prestressed concrete I-beam bridge, as identified through the PE Study. 107886~|~1~|~1~|~01/MPO~|~Resurfacing of N River Rd in Munroe Falls. 119333~|~1~|~1~|~01/S>2~|~Resurfacing. 97273~|~1~|~1~|~01/NFP~|~Added plan split due to funding 100359~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 105458~|~1~|~1~|~01/S>2~|~Pavement AC Overlay w/o Rpr MED SR 94 05.334 TO 5.383Smoothseal MED SR 162 15.288 TO 16.635 105458~|~1~|~3~|~03/STR~|~Bridge Work:MED SR 162 13.670 SFN 5206073EXPANSION JOINT REPAIR/REPLACEMENT (48) 105458~|~1~|~2~|~02/STR~|~Pavement AC Overlay w/o Rpr MED SR 94 5.383 TO 7.64, MED SR 94 7.91 to 10.345, MED SR 94D 0.000 TO 0.093Smoothseal MED SR 162 12.917 TO 15.288 101906~|~1~|~1~|~01/NFA~|~Trumbull County Engineer. 102571~|~1~|~1~|~01/STR~|~All work in the project is in this plan split. US 127 in Van Wert County from US 224 to the Paulding County line (12.22 to 18.39) and US 127 in Paulding County from the Van Wert County lime to the south corporation limits of the Village of Paulding (0.00 to 9.69). 119261~|~1~|~1~|~01/S5K~|~All items of work associated with resurfacing SR 665 that is located within the London Urban Area. 119261~|~1~|~2~|~02/STR~|~All items of work associated with resurfacing the routes located within the STP Rural Area. 122049~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 113850~|~1~|~1~|~01/SAF~|~"01/SAF/OT/MTVN" - 90% Federal (4HJ7) and 10% Local (4BG7) - see project CAP comments. Improvement of intersection at South Main Street and Columbus Road. 86694~|~1~|~1~|~01/STR~|~District Allocation 107603~|~1~|~1~|~01/MPO~|~Resurfacing of Ravenna Road from Idlewood Dr to Richner Ct in the City of Twinsburg. 80912~|~1~|~2~|~02/BRO~|~Realign ramps at HOC US 33 and SR 664 interchange. HOC US 33 7.74-8.29 (Ramps). Includes SFN 3704599, treatments include widening structure, deck replacement and other super structure repairs. 80% Federal/20% State. 80912~|~1~|~3~|~03/NHS~|~Realign ramps at HOC US 33 and SR 664 interchange. HOC US 33 7.74-8.29 (Ramps). NHS, Federal 80%/State 20%. 80912~|~1~|~1~|~01/SAF~|~Realign ramps at HOC US 33 and SR 664 interchange. HOC US 33 7.74-8.29 (Ramps). 80% Federal Safety funds and 20% State. 110826~|~1~|~1~|~01/STR~|~landslide repair 123760~|~1~|~1~|~01/IMS~|~Plan split for sign work on IR-280 in Lucas County 111580~|~1~|~1~|~01/STR~|~CEAO funded items 111580~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope items, such as asphalt rejunator. 115160~|~1~|~1~|~01/IMS~|~This plan split is for all work since the full scope is not known at this time of programming 123275~|~1~|~1~|~01/NFP~|~Culvert replacement/repairs. 116853~|~1~|~1~|~01/CMQ/YOUN~|~Signal upgrades/replacements. 94449~|~1~|~2~|~02/NHS~|~The funding is for design of two structures (COL-11-1777 L & R, SFN 1500872, 1500902) on SR 11 in COL county under the design-build contract. The scope involves superstructure replacement on both bridges and changing thge profile on the Left bridge to incerase vertical clearance on SR 517. 94449~|~1~|~1~|~01/NHS~|~The project involves the replacement of the reinforced concrete deck for bridges COL-11-1777 L & R (SFNs 1500872, 1500902), painting structural steel and converting the abutments to semi-integral. 94388~|~1~|~1~|~01/S>2~|~General System Resurfacing - Urbanized 94388~|~1~|~2~|~02/S>2/WADS~|~80/20 - 4PF7/4BG7 - City of Wadsworth Urban Paving 94388~|~1~|~3~|~03/S>2/WADS~|~100% City of Wadsworth 95937~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority 81724~|~1~|~1~|~01/NHS~|~priority system minor rehab. of COL-11-20.70 to 25.20; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking 103691~|~1~|~1~|~01/SAE~|~Erect new and replace substandard guardrail on various county roads in Clinton County. 98580~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-127-0.20 - SFN 4235568 - BR Eligible for replacement: L=95'; SD/FO=1; SR=49.3; DSR=4; over Dry Creek 120447~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 105236~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on rural routes: MER SR 197 SLM 3.37 to 6.33. 105236~|~1~|~2~|~02/S<2~|~Fine graded polymer AC overlay on sm urban routes: MER SR 197 SLM 2.26 to 3.37. 123670~|~1~|~1~|~01/STR~|~culvert split. 112639~|~1~|~1~|~01/MPO~|~Resurfacing of Fifth Ave from the Southern Liberty Township Line to Goldie Rd in Liberty Township. 111324~|~1~|~1~|~01/S<2~|~Pavement project on CR 10 (East Broadway Street) in the City of Jackson. Small City Grant. 116149~|~1~|~1~|~01/IMS~|~Resurface existing roadway using fine graded polymer modified asphalt concrete. 92698~|~1~|~1~|~01/STR~|~Plan Split for Culverts on ATB-SR46. SLM 3.30, SLM 8.76, SLM 9.39, and SLM 12.25 92698~|~2~|~2~|~02/STR~|~Culverts on SR-7/45/84/307/534. SLM ATB-7-16.02. SLM ATB-45-5.78. SLM ATB-84-1.02. SLM ATB-307-18.99. SLM ATB-534-5.96. 86872~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR-213 over North Fork Yellow Creek. In stream work is required. 114747~|~1~|~1~|~01/NHS~|~PIK double micro 95891~|~1~|~1~|~01/S>2~|~80/20 federal/local funding split for all pavement work. 95891~|~1~|~2~|~02/S>2~|~Work items at 100% local participation. 109478~|~1~|~1~|~01/S>2~|~Install sidewalk where it is currently not present. 102004~|~1~|~1~|~01/MPO~|~Resurface Meridian Road from I-680 to Trumbull County Line. Replace concrete roadway between the I-680 interchange ramps, includes catch basin repairs and installing curb ramps where needed. 93030~|~1~|~1~|~01/SAE~|~Upgrade Lighting at RR overpass01/SAE/OT/ 87800~|~1~|~1~|~01/NHS~|~Plan split for pavement work. 114161~|~1~|~1~|~01/IMS~|~Reconstruction of I-75 from Findlay St. to just south of Marshall Ave. This is the northern end of the Brent Spence Bridge Corridor Project. Project includes the construction of a new interchange on I-75 to connect to the new Western Hills Viaduct (WHV). The WHV project is being developed by the City of Cincinnati. 114161~|~1~|~2~|~02/IMS~|~This split covers bridge work on the project 105945~|~1~|~3~|~03/S>2/NILE~|~City of Niles waterline relocation. 105945~|~1~|~1~|~01/S>2~|~Resurfacing of TRU SR-46 in Weathersfield Township, Trumbull County, Ohio. 105945~|~1~|~2~|~02/S>2~|~Reconstruction of drainage system along TRU SR 46. 114103~|~1~|~1~|~01/S>2~|~Replace storm sewer along US 62 114103~|~2~|~2~|~02/SAF~|~Add a southbound right turn lane on US 62 at Alkire Rd 111290~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract for Franklin County 109788~|~1~|~1~|~01/NHS~|~NHS - Double Microsurface the existing pavement. 109788~|~1~|~2~|~02/STR~|~NHS - Resurfacing 109788~|~1~|~3~|~03/NFA~|~Not on Federal Aid System 99656~|~1~|~1~|~01/NFP~|~Ligting maintenance contract district wide. 121003~|~1~|~1~|~01/NHS~|~Resurfacing on HAM-50 107752~|~1~|~1~|~01/STR~|~Covers all work to rehab bridge 119771~|~1~|~1~|~01/SAF~|~Sidewalk and associated work on South Locust Street 96321~|~1~|~1~|~01/IMS~|~District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP ? Deck overlay: 1) SFN 4503813, LIC-IR 70-1781 carrying IR 70 over Lancers Road. Not BR Eligible for Rehabilitation: Length=155; SD/FO = (2); SR = 90.0; DSR = 7; 2) SFN 4503902, LIC-IR 70-1943 carrying IR 70 over SR 13. Not BR Eligible for Rehabilitation: Length=173; SD/FO = (2); SR = 94.0; DSR = 7; 101867~|~1~|~1~|~01/NFA~|~Guardrail replacement on various CR in Adams County. 106427~|~1~|~1~|~01/SAF~|~Construct sidewalks and upgrade traffic control near Lincoln Heights Elementary School. 84457~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7844255 TRU Parkman Mesopotamia Rd bridge over Andrews Creek 111942~|~1~|~1~|~01/NHS~|~Installation of a temporary traffic signal at the intersection of the SR 7 southbound off ramp and SR 872/Ferry Landing Road. 97695~|~1~|~1~|~01/STR~|~"01/STR/OT " - plan split for construction of a salt storage building at near Village of Baltic. 96624~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program budget. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds. 101059~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. 101059~|~1~|~2~|~02/NHS~|~This plan split is for the NHS route. 101059~|~1~|~3~|~03/S<2~|~This plan split is for the small urban route. 91366~|~1~|~1~|~01/STR/PIK~|~In Pike County, on CR50 1.95, it is proposed to repair the slip. Federal Declaration #OH11-02 80%fed/20%local 91366~|~1~|~2~|~02/STR~|~Temporary repair of the slip on PIK CR 50 1.95 DSR# PIK-001 101423~|~1~|~1~|~01/STR~|~PIK CR4 3.98 Emergency job. 117173~|~1~|~1~|~01/CMQ/STRE~|~New signal. 79976~|~1~|~2~|~02/NHS~|~Bridges for Rehab7100213 4.9007100272 6.74080/20 split 79976~|~1~|~1~|~01/NHS~|~ It is proposed to resurface US23 from 4.63 to 8.39 with asphalt concrete.Brdgs for Pave Thru:7100302 7.70 7100248 4.9780/20 split 105600~|~1~|~1~|~01/NHS~|~HUR SR 0018 21.69. 82566~|~1~|~1~|~01/S>2~|~This project is funded with a SIB loan. All work will be under this plan split. 92399~|~1~|~1~|~01/ENH~|~Knox County Project for extension of Heart of Ohio Trail 116996~|~1~|~1~|~01/NHS~|~TLCI Work 121564~|~1~|~1~|~01/NHS~|~NHS Plan Split 25529~|~1~|~2~|~02/NHS~|~This is for the noise wall on US-6 from SLM 11.32 to 11.25 (NHS). 25529~|~1~|~1~|~01/NHS~|~reconstruction HEN US 6 10.95-17.24 and HEN US24 9.80-10.42; NHSincluding the following bridges:3500217 HEN US6 11.5 Intersect: Oberhaus Creek3500241 HEN US6 11.5 Intersect: Oberhaus Creek3500276 HEN US6 12.26 Intersect: Abandoned Rr3500306 HEN US6 12.26 Intersect: Abandoned Rr3500330 HEN US6 12.47 Intersect: State Route 1083500365 HEN US6 12.47 Intersect: St Rt 1083500454 HEN US6 12.7 Intersect: Van Hyning Creek3500489 HEN US6 12.7 Intersect: Van Hyning Creek3500519 HEN US6 13.86 Intersect: Industrial Drive3500535 HEN US6 14.38 Intersect: County Rd 123501477 HEN US6 11.5 Intersect: Oberhaus Creek3500152 HEN US6 10.94 Intersect: Us Rt 24 &Us Rt 6 Eb3500578 HEN US6 16.5 Intersect: Maumee River 120973~|~1~|~1~|~01/NHS~|~Established Plan Split for CO CC 1 99931~|~1~|~1~|~01/STR~|~Pave culvert inverts. Funded 80 federal/20 state. 89460~|~1~|~1~|~01/NFA~|~Reconstruct railroad crossing. 123212~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ATH 278 0.00-2.135. Rural other federal aid funded 80 Federal/20 State. 123212~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. ATH 278 2.135-3.846. Urban federal aid funded 80 Federal/20 State. 107524~|~1~|~1~|~01/STR~|~Resurfacing HAS-646 107385~|~1~|~1~|~01/NHS~|~Spit for resurfacing work 109782~|~1~|~1~|~01/STR~|~Ac Overlay with repairs 112249~|~1~|~1~|~01/STR~|~General plan split. Will be more specific when locations are determined. 91464~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 6.59-19.96. Rural other federal aid funded 80 federal/20 state. 91464~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 19.96-20.18. Urban other federal aid funded 80 federal/20 state. 105263~|~1~|~2~|~02/STR~|~AC overlay without repairs 105263~|~1~|~1~|~01/S<2~|~AC overlay without repairs 105263~|~1~|~3~|~03/NFA~|~Resurface SR 705 Not on Federal Aid System 95979~|~1~|~1~|~01/NFP~|~design and construction of new building at brunswick outpost 121186~|~1~|~1~|~01/S>2~|~STP >200,000 Plan Split 121186~|~1~|~2~|~02/STR~|~STP Rural Plan Split 106690~|~1~|~1~|~01/IMS~|~Split for bridge work. 118873~|~1~|~1~|~01/STR~|~plan split 118873~|~1~|~2~|~02/S5K~|~plan split. 123938~|~1~|~1~|~01/SAF~|~Geotechnical stabilization 101668~|~1~|~1~|~01/NFA~|~Guardrail replacement project for FY2020. HOC CR 1 0.00-2.71, CR 2 0.00-2.06, CR 72 0.00-1.71, and CR 76 0.00-4.31. Funded 100% federal. 101668~|~1~|~2~|~02/S<2~|~Guardrail replacement project for FY2020. HOC CR 14 0.00-0.81. Funded 100% federal. 101668~|~1~|~3~|~03/STR~|~Guardrail replacement project for FY2020. HOC CR 14 0.81-1.81. Funded 100% federal. 107526~|~1~|~1~|~01/NFA~|~Resurfacing SR 751 107526~|~1~|~2~|~02/STR~|~Resurfacing TUS-751 from CR 21 to IR 77 93043~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 22-00.00 to 10.58 93043~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge work items on 1) Fai-22-1063 SFN 2300850 carrying US 22 over US 33 102815~|~1~|~1~|~01/IMS~|~Widen IR 270 between IR 670 interchange and bridge over Big Walnut Creek 102815~|~1~|~2~|~02/SAF~|~Raise Goshen lane structure over IR 270 due to widening. 102815~|~1~|~3~|~03/IMS~|~Goshen Lane structure minor repairs and painting of structural steel 88357~|~1~|~1~|~01/BRO~|~Replace Bridge SFN 6737080 West Main Street Bridge over CSX RR and Cuyahoga River 96552~|~1~|~1~|~01/STR~|~See linked structures > 20' span. 96552~|~1~|~2~|~02/STR~|~See linked structures 10' to 20' span. 96552~|~2~|~4~|~04/STR~|~See linked structure >20' span. 96552~|~1~|~3~|~03/STR~|~Erosion Repair along SR 534. 87152~|~1~|~1~|~01/STR~|~01/STR/PV This split is for work eligible for rural STP funds. 124054~|~1~|~1~|~01/NFP~|~Plan Split for the traffic signal upgrades at various locations in the district. 98660~|~1~|~1~|~01/IMS~|~Plan split for all work 86731~|~1~|~3~|~03/STR~|~District Allocation 86731~|~1~|~2~|~02/S<2~|~District Allocation 86731~|~1~|~1~|~01/STR~|~District Allocation 118899~|~1~|~1~|~01/STR~|~Resurfacing SR 3 88065~|~1~|~1~|~01/BRO~|~8701202 WOO US20 10.09 Intersect: Crane Creek 88065~|~1~|~2~|~02/NHS~|~8701172 WOO US20 9.25 Intersect: Crane Creek Branch 96675~|~1~|~1~|~01/SAF~|~Microsurface approach lanes of MOT SR 48 4.33 (@ SR 725/Alex Bell Road), MOT SR 48 17.09 (@ Turner/Shoup Mill Road) and MOT SR 201 7.56 (@ Chambersburg Road). 121585~|~1~|~1~|~01/STR~|~Culvert Replacement 88954~|~1~|~1~|~01/STR~|~SFN 7805497 SR87 12.71 Pymatuning Creek 104404~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2018/2019 herbicidal spraying. Various routes and sections in D10. Funded 100% state. 83912~|~1~|~1~|~01/NHS~|~Construction cost to remove and rebuild a failing retaining wall along the east side of US 22/3 using GSM funds. 83912~|~2~|~2~|~02/SAF~|~Add left turn lane from US22 to Lakeshore within existing right of way. 83912~|~2~|~3~|~03/SAF~|~warren county water line relocation 110305~|~1~|~1~|~01/IMS~|~Demolition of buildings on 4 parcels. Only buildings in this contract shall be demolished in their entirety and debris/materials disposed of off-site. These building removals are required as part of the HAM-75-7.89 (PID 77889) project. 86903~|~1~|~2~|~02/S>2~|~100% local plan split 86903~|~1~|~1~|~01/S>2~|~85/15 funding split for work that is eligible for State STP funds 122849~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 116626~|~1~|~1~|~01/STR~|~OTT-357 123569~|~1~|~1~|~01/IMS~|~Lighting replacements along a portion of HAM-71 96790~|~1~|~1~|~01/S<2~|~Microsurfacing of TUS-416 from Tuscarawas to New Philadelphia including pavement repairs and pavement markings. 117797~|~1~|~1~|~01/MPO/STCE~|~Structure replacement. 107688~|~1~|~1~|~01/IMS~|~Capacity improvements at SW Interchange. 98170~|~1~|~1~|~01/STR~|~STP Rural Bridge 80/20 Non-BR MAD-323-3.91 over Paint Creek 101124~|~1~|~1~|~01/IMS~|~Freeway systematic sign replacement at various locations throughout District 2. 120292~|~1~|~1~|~01/SAF/MACE~|~Guardrail upgrades on various county routes in MAH County. 114012~|~1~|~1~|~01/SAF~|~ROS CR VAR PM FY26 111353~|~1~|~1~|~01/NFP~|~Microsurfacing in Hueston Woods State Park 90852~|~1~|~1~|~01/MPO~|~Reconstruction including installation of new curbs, storm sewer, water main, utility relocation, street lights, communication fiber extension and traffic signage upgrades. Also included is replacement of some loop detectors, all new traffic control signage, guardrail and traffic markings on CR 25A from SR 571 to Michaels Road. 117499~|~1~|~1~|~01/CMQ/STCE~|~Construct roundabout at the State St/Cleveland Ave intersection. 124053~|~1~|~1~|~01/NFP~|~Plan split for sign replacement and upgrades at various locations in the district 120472~|~1~|~1~|~01/SAF~|~Safety work. 111002~|~1~|~1~|~01/SAF~|~Install sidewalk along the north side of West Limestone Street from Mills Lawn Elementary School to Dayton Street. 97108~|~1~|~1~|~01/SAF~|~Plan split for lighting maintenance contract. Routes to be determined. 106162~|~1~|~1~|~01/STR~|~Landslide repair. WAS 145 3.14. DSR WAS-001. Rural other federal aid funded 80 federal/20 state. ER funds. 109165~|~1~|~1~|~01/STR~|~Two lane resurfacing 80% federal (4B77) 20% local (LNTP). 96340~|~1~|~1~|~01/NFA~|~Rehabilitation of the 5 mile long section of the Lebanon, Mason, & Monroe (LM&M) railroad owned by the City of Lebanon. Improvements include replacement of approximately 600 defective rail ties and rehabilitation of 4 bridges along the line. 97630~|~1~|~2~|~02/BRF~|~Replace MRW-TR 175-0.12 (Shurr Rd) structure over South Branch of Kokosing River SFN 5931894 97630~|~1~|~3~|~03/BRF~|~Replace MRW-CR 180-0.19 (Dailey Rd) structure over Kokosing River SFN 5932157 97630~|~1~|~1~|~01/BRF~|~Replace MRW -TR 82-0.94 (Craven Rd) structure over a tributary to Cedar Fork Creek SFN 5931843 110246~|~1~|~1~|~01/NFP~|~Normandy Park Drive Roadway Improvements 83848~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) COS-SR 229-0.00 to 0.70; 2) KNO-SR 229-14.41 to 25.38; 83848~|~1~|~2~|~02/S<2~|~District Preservation Pavement Funding - 4PF7 (870% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) KNO-229-9.53 to 14.41; 2) KNO-308-0.00 to 0.30, 113563~|~1~|~1~|~01/NFA~|~Created for J&C involvement 112465~|~1~|~1~|~01/MPO~|~Split for MPO funds eligible work 117153~|~1~|~1~|~01/SAF~|~South Green Drive Pedestrian Safety Improvements. Work includes RRFB, signing, markings, curb ramps, bulb outs, etc. 102440~|~1~|~1~|~01/STR~|~Guardrail replacement on various routes in District 11 100887~|~1~|~1~|~01/STR~|~JAC 279 10.13 (SFN 4003098) 107965~|~1~|~1~|~01/IMS~|~Plan Split for pavement work 82202~|~1~|~1~|~01/STR~|~This split is for the 18.00 portion of the project. The funds are from the District Preservation Program. 82202~|~1~|~2~|~02/STR~|~This split is for the 16.90 portion of the project. The funds are from the Geologic Site Management (GSM) program. 107367~|~1~|~1~|~01/IMS~|~District Preservation Conduit Funding - 4PF7 (90% Federal / 4PS7 (10% State) - No CAP - Repair or Rehabilitation of conduits identified above. 107367~|~1~|~2~|~02/NHS~|~District Preservation Conduit Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP - Repair or Rehabilitation of conduits identified above. 107367~|~1~|~3~|~03/STR~|~District Preservation Conduit Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP - Repair or Rehabilitation of conduits identified above. 114069~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction costs 124299~|~1~|~1~|~01/NHS~|~Vegetation clearing around bridges in D11. 124339~|~1~|~1~|~01/ENH~|~Programming project. 102533~|~1~|~3~|~03/NHS~|~District Preservation Bridge Funding - 4PF7 (80%)/4PS7 (20%) - No CAP - Deck sealing and MSE Wall Repairs at various locations on NHS Routes in District 5 102533~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - No CAP - 4PF7 (90%)/4PS7 (10%) - Deck Sealing on Interstate Locations in District 5 102533~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80%)/4PS7 (20%) - No CAP - Deck Sealing on OFAH-Rural locations in District 5. 102533~|~1~|~4~|~04/S<2~|~District Preservation Bridge Funding - 4PF7 (80%)/4PS7 (20%) - No CAP - Deck Sealing on OFAH-Urban locations in District 5. 107271~|~1~|~1~|~01/NFP~|~Repair of CR 3 in Putnam County after the installation of a water line 121037~|~1~|~1~|~01/NHS~|~Crack sealing 115985~|~1~|~1~|~01/NFA~|~Widen Upper Valley Pike by 2 ft. on each side 94234~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split. 94234~|~1~|~2~|~02/SAF~|~Recessed wet reflective pavement markings. 88690~|~1~|~2~|~02/S<2~|~Microsurface the existing roadway MIA-SR-718 4.300 to 8.160 88690~|~1~|~4~|~04/STR~|~Microsurfacing the exisiting pavement from the N Corporation Limit of Celina to the Mercer County Line. SLM 14.68 to 26.13. 88690~|~1~|~5~|~05/SAF~|~Pavement Markings and/or replacements of RPMs as needed for project. 88690~|~1~|~3~|~03/S>2~|~Microsurface the existing roadways MIA SR 718 8.16 to 8.26. 88690~|~1~|~1~|~01/NHS~|~Microsurface the existing roadways on: CHP-US-68 8.90 to 16.200 96562~|~1~|~2~|~02/NHS~|~Minor bridge work to SFN 7700423 SUM 261 11.88 over SR 8/SR 59 eligible for BR funds for Rehab only. 96562~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing of SUM SR 18 from 6.56 to 8.15, SR 261 from 10.89 to 11.33 and SUM SR 261D 0.64 to 0.80, urban paving in the city of Akron. 96562~|~1~|~3~|~03/NHS/AKRO~|~100% city of Akron Items. 108954~|~1~|~1~|~01/SAF~|~Plan Split for SRTS funds 107216~|~1~|~1~|~01/ENH~|~Add new sidewalks to SR 5 in Kinsman Township. 99210~|~1~|~1~|~01/STR~|~This split is for all resurfacing work on CR 304. This split uses 80% Fed. (4B77) - 20% Local (LNTP). 99210~|~1~|~2~|~02/NFA~|~This split is for all resurfacing work on CR 330. This split uses 80% federal SAC 4B77 and 20% local funds SAC LNTP. CR 330 is a rural minor collector. 88342~|~1~|~1~|~01/BRF~|~Bridge replacement and realignment 117544~|~1~|~1~|~01/SAF~|~Guardrail replacements in D05 97658~|~1~|~1~|~01/NFA~|~Resurfacing TUS-751 from the COS Co. Line to SLM 4.02 including asphalt overlay, pavement repairs and pavement markings. 97658~|~1~|~2~|~02/STR~|~Resurfacing TUS-751 from SLM 4.02 to SLM 4.38 (Stonecreek). 122329~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 90470~|~1~|~1~|~01/MPO~|~Mill & Fill 93560~|~1~|~1~|~01/NFA~|~Task order PID for the consultant to provide construction inspection services throughout the district. (Paint) 115349~|~1~|~1~|~01/NFA~|~Construct sidewalks and corresponding ADA facilities. 94665~|~1~|~1~|~01/SAF~|~Project involves installing new Raised Pavement Markers on various county routes in Butler County 87332~|~1~|~1~|~01/NHS~|~7101694 ROS US35 13.53 Intersect: W Fork Of Biers RunBrdg Repair 80 Fed/20 State. 01/NHS/BR/State 109760~|~1~|~1~|~01/STR~|~AC Overlay without repairs 105109~|~1~|~1~|~01/STR~|~SCI 335 12.02 (SFN 7305133) 87136~|~1~|~2~|~02/NHS/FOST~|~Work on the NHS in the City of Fostoria. The 80% federal funds will be from the District Preservation Program fund SAC 4PF7. The 20% match will be provided by the City of Fostoria. 26.79 to 27.93. From the Corporation Limits of the City of Fostoria to the Seneca County Line. 87136~|~1~|~1~|~01/NHS~|~Work on the NHS. All funds are from the District Preservation Program 80% SAC 4PF7 and 20% SAC 4PS7. Work outside of the City of Fostoria. 87136~|~1~|~3~|~03/NFP/FOST~|~Items paid 100% by the City of Fostoria. 88767~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 123843~|~1~|~1~|~01/STR~|~geotech plan split. 106803~|~1~|~1~|~01/NHS~|~Beam Repair 98344~|~1~|~1~|~01/NHS~|~ District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP -District wide guardrail upgrade/replacement on NHS Routes 1) Gue-22-(5.59-6.04), 2) Gue-22-(9.28-11.12), 3) Gue-723-(0.48-0.85), 4) Cos-36-(16.40-19.06). 98344~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP -District wide guardrail upgrade/replacement on OFAH-Urban Routes Cos-541-(17.79-18.56) 98344~|~1~|~3~|~03/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP -District wide Guardrail upgrade/replacement on IMS Routes: Gue-723-(0.07-0.48) and Gue-723 to Gue IR 70 WB on ramp, and Gue IR 70 WB off ramp to SR 723. 98344~|~1~|~4~|~04/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP -District wide project to upgrade/replace guardrail on OFAH-Rural Routes: Cos-541-(0.00-8.59), Cos-541-(8.73-17.79), Fai-664-(1.80-10.84), Gue-513-(6.92-7.02), Kno-229-(0.55-6.55), Lic-586-(1.66-9.90), Per-13-(13.50-17.50), Per-37-(15.02-20.69), Per-216-(0.04-1.00), Per-669-(9.50-9.72), and Per-595-(0.00-2.10) 115417~|~1~|~1~|~01/IMS~|~This plan split addresses all bridge work needed for the project, which could include new bridges or treating the IR-275 bridges over the Little Miami River and over Loveland Madeira. 115417~|~1~|~2~|~02/IMS~|~This plan split includes all roadway work for the project, including shoulder widening, resurfacing, ITS items, and other required non-bridge work. 115417~|~2~|~3~|~03/IMS~|~plan split for steel repairs on the HAM-275-3484 bridges 109886~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2025. Various routes and sections. Funded 100% State. 102545~|~1~|~1~|~01/S>2~|~This plan split is for the resurfacing of the large urban sections. 102545~|~1~|~2~|~02/STR~|~This plan split is for the resurfacing of the rural sections. 98198~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7 (100% State) - Replacement of Raised Pavement Markers on various routes throughout D-05 118684~|~1~|~1~|~01/S5K~|~Resurface rural population 118684~|~1~|~2~|~02/NFA~|~Resurfacing Not on Federal Aid System 119073~|~1~|~1~|~01/MPO/SYC~|~Installation of pre-emption at all signalized intersections in Sycamore Township. 119073~|~1~|~2~|~02/MPO~|~for use of cost difference between generic items and alternate bid 105279~|~1~|~1~|~01/NHS~|~Resurfacing COL-30 105279~|~1~|~2~|~02/NHS~|~Bridge deck sealing with HMWM for SFN 1502131 & SFN 1502190 118793~|~1~|~1~|~01/BRO~|~Bridge rehabilitation work. 100702~|~1~|~2~|~02/NHS~|~Remove/replace median u-turns and add acceleration/deceleration lanes along State Route 21 at Minor Road, Copley Township, Summit County, Ohio. 100702~|~1~|~1~|~01/IMS~|~Construction of 700 foot 57" barrier wall on IR 77 NB to SR 21 SB Ramp, includes resurfacing of ramp and shoulder in Copley Township, Summit County, Ohio. 88748~|~1~|~1~|~01/STR~|~Traffic signal maintenance 4CP7 does not require splits. 111636~|~1~|~1~|~01/IMS~|~Concrete deck overlay project. NOB 77 16.67 L (SFN 6100848) and R (SFN 6100872), 17.70 L (SFN 6100961) and R (SFN 6100996), 16.80 L (SFN 6100902) and R (SFN 6100937). Interstate route funded 90 Federal/10 State. 119360~|~1~|~1~|~01/BRO~|~Bridge. 100437~|~1~|~1~|~01/NHS~|~Deck Sealing 103267~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 101508~|~1~|~1~|~01/STR~|~DSR# BEL-021 97360~|~1~|~1~|~01/NFP~|~Mowing 93919~|~1~|~1~|~01/ENH~|~Intersection bump outs for safer pedestrian crossing and traffic calming measures, Landscape enhancements, drainage improvements and theme based signage, & ADAAG crb ramps. East Main Street in Fairborn from Pleasant Avenue to Dayton Drive. 93919~|~1~|~2~|~02/ENH~|~Plan Split covers the improvements that are not eligible for federal TA funding (roadway resurfacing, replacement of existing curb and sidewalk that is not in deteriorating condition, etc.). 108938~|~1~|~1~|~01/NFP~|~All work is in this plan split. 86154~|~1~|~2~|~02/S>2/BHts~|~Miscellaneous roadway work, Boston Heights, Summit County, Ohio. 86154~|~1~|~1~|~01/BRO~|~SFN 7768141 Akron Cleveland Rd over Metro Park Bike Path 93743~|~1~|~1~|~01/SAE~|~Install sidewalk (where none exist) and ADA compliant curb ramps, sand replacing deteriorated curbing and driveway approaches 300' West of Ravenwood venue to Catalpa Drive. 88609~|~1~|~1~|~01/STR~|~Replace structure SFN 5901863 - MRW 95-0.24 over Otter Creek and associated roadway work on SR 95 and the south leg of TR 60 88609~|~1~|~2~|~02/NFA~|~Replace structure 5931525 MRW-TR60-2.00 over Otter Creek 88746~|~1~|~1~|~01/SAF~|~4CP7 funds don't require the location being entered. Highway lighting maintenance districtwide. 115613~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 104047~|~1~|~1~|~01/SAF~|~Guardrail upgrade/replacement on various routes with 100% federal 4HB7 funding. 76014~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities - 4MA7-005 (100% State) - Facilities funding for construction of the new Dresden Outpost 117950~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4. 98337~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full depth pavement Repairs on the NHS: 1) Lic-40-4.69 to 5.27 98337~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full depth pavement Repairs on the OFAH-Rural: 1) Cos-651-00.00 to 3.04, 2) Gue-313-9.91 to 21.02, 3) Lic-40-6.14 to 14.37, 4) Lic-40-16.66 to 28.60, and 5) Fai-159-0.00 to 6.74 98337~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full depth pavement Repairs on the OFAH-Urban: 1) Lic-40-5.27 to 6.14, and 2) Lic-40-14.37 to 16.66 98337~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation (100% State) 4PS7 for Spot Pavement Repairs on 1) Gue-313-2.24 to 9.91 and 2) Cos-643-00.00 to 10.65 98760~|~1~|~1~|~01/ENH~|~Installation of a minimum 6' wide sidewalk on both sides of SR-125 (Beechmont Avenue) between Forest Road and Wolfangel Road, new bus pull-offs near the Beechmont Avenue and Wolfangel Road intersection, and related drainage, curb, lighting, singal, and landscaping improvements. 98760~|~2~|~2~|~02/SAE~|~Five Mile Road to the County Line in Hamilton County and county line to Independence/Hopper Hill in Clermont County. Access management and minor traffic control improvements. 114237~|~1~|~1~|~01/IMS~|~Bridge sealing 93551~|~1~|~2~|~02/SAE~|~SRTS Project 93551~|~1~|~1~|~01/SAE~|~SRTS Project 100649~|~1~|~1~|~01/STR~|~Plan Split for the rural portions of US 40 within the project. This is between SLM 9.93-17.68 91449~|~1~|~2~|~02/S>2~|~General system paving FRA-315: 12.79-13.49, 13.56-13.80 91449~|~1~|~1~|~01/S>2~|~Columbus urban pavingFRA-3D: 0.00-0.34FRA-315: 13.49-13.56 113055~|~1~|~2~|~02/SAF~|~Installing new wrong way signage and markings on US 30 in Allen County aimed at safety improvements. Will be safety funded with 100% SAC 4HJ7. 113055~|~1~|~1~|~01/NFP~|~All general pavement marking updates in this split- non safety items. Funding is 100% state funding using SAC 4PS7. 111170~|~1~|~1~|~01/NFP~|~ODNR Division of Wildlife project to include microsurfacing access road and parking area repairs at the Racine Ohio River Access in Meigs County. Funded 100% state. 96608~|~1~|~1~|~01/NHS~|~The project is going to rehabilitate the bridge TUS-250-2033 (SFN 7905378) by replacing the existing steel beam superstructure with a new steel beam superstructure. The bridge will be raised to meet the Vertical Clearance requirement of 16'-06" and the abutments will be converted to semi-integral. 90412~|~1~|~1~|~01/BRF~|~Project involves the replacement of the structurally deficient Bridge No. PRE-CR18-0155 (SFN: 6836267), which carries California School Road (CR-18) over Four Mile Creek and the replacement of structurally deficient Bridge No. PRE-TR 15-0135 (SFN: 6839401) which carries Monebrake Road (TR-150) over Seven Mile Creek. Work includes minor approach work, pavement repairs, and vertical alignment adjustments, as necessary. 93601~|~1~|~1~|~01/SAE~|~Federal Safety funding for the intersection improvement which primarily will add left-turn slot to US-20 to McMackin Road. 106833~|~1~|~1~|~01/BRF~|~Replacement of the existing bridge deck with minor widening required to meet minimum design standards. Rehabilitation of the existing abutments and placement of rock channel protection along the stream banks to protect the sub-structure from future erosion. 116239~|~1~|~1~|~01/NHS~|~Double micro in ROS. 123481~|~1~|~1~|~01/ENH~|~ADA compliant pedestrian improvements utilizing Federal TAP and Safety funding up to the CAP. 110269~|~1~|~1~|~01/NFP~|~1 1/" asphalt overlay, pavement repair and other roadway items to the reservable and main drive and lots (off of Browns School Road) and south park main drive and lots (off of USR 40). 101221~|~1~|~1~|~01/STR~|~Resurfacing. 101221~|~1~|~2~|~02/S>2~|~Resurfacing SR199 from slm 27.96-28.80 95546~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations include: MRG-78-15.90, MRG-60-20.45, MRG-60-20.74, MRG-60-20.80, NOB-285-1.83, NOB-821-1.69, and NOB-821-18.42. Rural other federal aid funded 80 federal/20 state. 95546~|~1~|~2~|~02/S<2~|~Culvert replacement project. NOB-821-11.50. Urban other federal aid funded 80 federal/20 state. 118361~|~1~|~1~|~01/NFA/POCE~|~Bridge replacement. 101861~|~1~|~1~|~01/NFA~|~The City will be constructing a new road off U.S. 42 that will be connecting the main entrance of the new facility being build for Engineered Materials System, Inc. (EMS) 101971~|~1~|~1~|~01/NFP~|~Split for state funds to add VPF to the structure. 84572~|~1~|~2~|~02/NHS~|~Deck overlays to SFN 7606206 STA SR 241 14.67 over Noble Pond and SFN 7606273 STA SR 241 17.14 over Nimishillen Creek. Culvert invert repair to SFN 7606249 STA SR 241 14.82. 84572~|~1~|~1~|~01/S<2~|~Resurfacing of STA SR 241 from 11.29 to 17.90. 84588~|~1~|~1~|~01/NHS~|~Culvert Construction/Repair 119380~|~1~|~1~|~01/IMS~|~Split for bridge work in the interstate system. 98267~|~1~|~1~|~01/MPO~|~Installation of sidewalks which would fill in the missing gaps identified in the Mad River Middle School Travel Plan on the South side of Valley Pike from Hypathia Avenue to Spicewood Drive. 123265~|~1~|~1~|~01/SAF~|~Lighting reactive maintenance. 96111~|~1~|~1~|~01/NFP~|~Project to construct new Columbiana County Garage 105547~|~1~|~1~|~01/STR~|~Rural plan split MAD-42-0.00-3.96 & 9.86-12.35 105547~|~1~|~3~|~03/NHS~|~NHS plan split MAD-42-13.43 - 25.15 105547~|~1~|~2~|~02/S<2~|~London urban area plan split MAD-42-3.96-5.92 & 9.16-9.86 105547~|~1~|~4~|~04/NHS/MAD~|~Repair work to be funded by Madison County 111040~|~1~|~1~|~01/STR~|~Culvert ReplacementJAC-279-8.76 89156~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge Project 96449~|~1~|~1~|~01/STR~|~Two-lane reurfacing project using an asphalt overlay treatment. WAS 339 8.57-13.64. Federal Aid rural route funded 80% Federal/20% State. 116093~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in ATB, MAH and TRU Counties. 91993~|~1~|~1~|~01/STR~|~JAC SR93 0.00-3.63JAC SR279 12.48-19.44 112823~|~1~|~1~|~01/NHS~|~MAR-23 from 7.78 to 9.74 112823~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 111610~|~1~|~1~|~01/NFP~|~Construct new road to service the new Hendrickson USA facility. 93142~|~1~|~1~|~01/NFA~|~Resurfacing with related work on Mus-SR 284-00.00 to 13.36 98242~|~1~|~2~|~02/STR~|~STP Rural Micro: ASD-60-11.74-15.74/ASD-511-6.92-10.96/RIC-430-10.07-10.11 98242~|~1~|~1~|~01/S<2~|~S<2 Micro: ASD-60-15.74-16.22/ASD-511-10.96-11.35/ASD-511C-0.00-0.04/RIC-430-7.00-10.07 91902~|~1~|~1~|~01/NHS~|~Resurfacing form SLM 0.00-4.30 and miscellaneous bridgework 80108~|~1~|~2~|~02/NHS~|~Federal/Local urban paving in Columbuson NHS route, FRA-23: 0.51-1.50, 2.21-4.58, 5.41-5.6302/NHS/PV/F_LC 80108~|~1~|~1~|~01/NHS~|~Federal/State NHS resurfacing on FRA-23: 0.00-0.51, 1.50-1.94, 4.58-5.41 Unincorporated areas01/NHS/PV/F_ST 80108~|~1~|~4~|~04/NHS/COL~|~100% Columbus items for pvmt repair 80108~|~1~|~3~|~03/NHS~|~Federal NHS/State funding for minor bridge work on 2 structures:2500485 FRA US23 0.25 Intersect: Big Walnut Cr2500515 FRA US23 0.25 Intersect: Big Walnut Cr 122474~|~1~|~1~|~01/STR~|~All work included in this split. 115760~|~1~|~1~|~01/S5K~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on PRE-122 115760~|~1~|~2~|~02/S5K/EATN~|~Plan split for the 100% City items on the urban paving on PRE-122 101326~|~1~|~1~|~01/IMS~|~FRA IR 270 29.39 to 31.70 101326~|~1~|~2~|~02/NHS~|~FRA-33-4.86 to 8.78; MAD-42-4.80 to 5.93; PIC-22-18.88 to 23.96 101326~|~1~|~3~|~03/STR~|~MAD-42-0.00 to 3.96 and PIC-22-21.04 to 23.96 101326~|~1~|~4~|~04/S<2~|~MAD-42 3.96 to 4.80 and PIC-22-20.65 to 21.04 97681~|~1~|~1~|~01/STR~|~Partial and full depth repair and mill & fill at various locations on SR 161 and SR 347. Minor bridge repair. 93758~|~1~|~1~|~01/SAF~|~ It is proposed to install traffic signals with lighting at the intersection of SR159 & TR236 (Delano Road). 80/20 split01/SAF/OT/State 98687~|~1~|~2~|~02/S>2~|~Plan Split for all work associated with the new bridge over Duck Creek 98687~|~1~|~1~|~01/S>2~|~Plan Split for all roadway work associated with the new Babson/Hetzel connection. 97731~|~1~|~1~|~01/NFA~|~J&C adding access road in the city of Columbus 88828~|~1~|~1~|~01/CMQ~|~Cooper Road: from Waxwing Drive to Plainfield Road Project involves adding curb, gutter, and an 8 foot sidewalk to the south side of Cooper Road in Blue Ash 94597~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt inlay treatment. WAS 7 49.40-54.03 and MOE 7 5.40-8.65. NHS route funded 80 federal/20 state. 112563~|~1~|~1~|~01/NHS~|~Federally eligible items. 86935~|~1~|~2~|~02/S>2~|~Plan split for STA SR 619 4.66 to 6.69 86935~|~1~|~3~|~03/STR~|~Plan split for SFN 7606400 STA SR 619 7.69 over Swartz Ditch 86935~|~1~|~1~|~01/STR~|~Plan split for STA SR 619 6.69 to 7.36 25732~|~1~|~1~|~01/NHS~|~Bridge Deck Replacement 100158~|~1~|~1~|~01/MPO~|~80% federal w/20% local matching funds for project eligible work items. 114743~|~1~|~1~|~01/STR~|~SCI chipseal 111280~|~1~|~1~|~01/ENH~|~Construct 10' bike/ped trail; 95% Federal/5% Local (95% 4B37/5% LNTP). 113283~|~1~|~1~|~01/S>2~|~Culvert Replacement on MED SR 0057-09.78Culvert Replacement on MED SR 0094 18.84 113030~|~1~|~1~|~01/S<2~|~This split is for SR 81 within the Lima Urbanized area. From the beginning of the project to the Lima Urbanized Boundary at Thayer Road at 22.24. District preservation program funds. No local funds. 113030~|~1~|~2~|~02/STR~|~This split is for SR 81 in Allen County outside of the Lima Urbanized area. From the the Lima Urbanized Boundary at Thayer Road at 22.24 to the end of the project at the Hardin County line. District preservation program funds. No local funds. 80665~|~1~|~1~|~01/ERD~|~Plan Split for Paving SUM Lauby Road between Airport Entrance and Greensburg Rd. 80665~|~1~|~2~|~02/SAF~|~Plan Split for Widening SUM Lauby Road Between airport Entrance and Greensburg Rd. 95198~|~1~|~1~|~01/STR~|~Resurface portions of CR 5 SLM 0.00 to 5.93, CR 43 SLM 1.90 to 4.93 and CR 18 SLM 4.52 to 5.73. 95198~|~1~|~2~|~02/S<2~|~Resurface portions of CR 11 SLM 8.72 to 10.43 and CR 18 SLM 5.73 to 5.90 and possible widen fo CR 11 from TR 45 to CR 43. 119180~|~1~|~1~|~01/STR~|~Plan split for WOO-281-6.06 and WOO-281-9.06 Culverts 84514~|~1~|~1~|~01/STR~|~Two-Lane reurfacing project using an asphalt overlay treatment. ATH 278 0.00-2.16, and HOC 278 6.15-10.77. Rural other federal aid funded 80 federal/20 state. 84514~|~1~|~2~|~02/S<2~|~Two-Lane reurfacing project using an asphalt overlay treatment. ATH 278 2.16-2.19 and HOC 278 5.38-6.15. Urban other federal aid funded 80 federal/20 state. 84514~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 278 3.15-3.85. Urban other federal aid in they City of Nelsonville funded 80 federal/20 local. 119332~|~1~|~1~|~01/NFA~|~Operations Chip Seal Routes to be performed in FY24 102446~|~1~|~1~|~01/STR~|~ADA 348 1.53 (SFN 0104086) Bridge Repair. 120005~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 123776~|~1~|~1~|~01/BRO~|~Bridge Replacement 106091~|~1~|~1~|~01/NFA~|~The Port Authority will construct 1700 feet of new two lane road to extend Kister Court from the existing cul-de-sac to North Bend Road. 99982~|~1~|~1~|~01/S>2~|~SR 54 from Urbana S. Cor/Powell St. (SLM 10.66) to USR 36 (SLM 11.22) - Pavement planing and resurfacing of SR 54 within the City of Urbana (1.75 inches). 123960~|~1~|~1~|~01/S>2~|~Resurfacing 91095~|~1~|~2~|~02/NHS~|~Pavement Replacement for NHS section, WAY-83-10.81 to 11.03 91095~|~1~|~1~|~01/S<2~|~Central Office Rehab Funds and District Allocation Funds for STP<200000Roadway work for:WAY-3-14.56 to 17.70WAY-83-13.73 to 14.64WAY-585-0.00 to 0.33 91095~|~1~|~4~|~04/BRO~|~WAY-250-12.18 (L) SFN 8500606 Concrete Deck Patching 91095~|~1~|~3~|~03/BRO~|~WAY-3-15.16 SFN 8500754 (Apple Creek) Concrete Deck Patching (S<200000)WAY-3-15.54 SFN 8500878 (Little Apple Creek, Ramp H-1) Concrete Deck Patching (S<200000)WAY-3-15.52 WR SFN 8500843 (Little Apple Creek, Ramp H-2) Full Depth Repair (S<200000) 91095~|~1~|~6~|~06/S<2~|~100% City Items - Repairs for urban paving section, culvert replacements, etc. 91095~|~1~|~5~|~05/S<2~|~Urban Paving for WAY-3-17.61 to 17.89 91095~|~1~|~7~|~07/SAF~|~Recessed Wet Reflective Pavement Markings 102514~|~1~|~1~|~01/NFA~|~The City is reconstructing Cochran Road between the Carter intersection and the Ambina intersection 111541~|~1~|~1~|~01/NHS~|~2" Overlay of Asphalt Concrete on: MOT-4-SLM 7.13 to 8.13 in the City of Moraine. 100906~|~1~|~1~|~01/STR~|~Rehab or replace various culverts in Preble County. 100322~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to STA US 62 from 30.12 to 35.50. 100327~|~1~|~1~|~01/SAE~|~Railroad preemption and signal construction. 92079~|~1~|~1~|~01/IMS~|~8703698 WOO IR75 12.94 Intersect: Us 6 8703728 WOO IR75 12.94 Intersect: Us 6 101799~|~1~|~1~|~01/STR~|~CHP-29-0264-Reapir right side deck-edge, reface abutments using anodes & encase pier columns. 101799~|~1~|~2~|~02/NHS~|~Rebuild deck edges & encase pier columns. Reface abutments using SCC. 117665~|~1~|~1~|~01/IMS~|~Split for bridge work 105448~|~1~|~1~|~01/S<2/KCEO~|~Knox County CEAO Resurfacing Program - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing and related work on the OFAH-Urban portion of Knox County Road 6. 105448~|~1~|~2~|~02/STR/KCEO~|~Knox County CEAO Resurfacing Program - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing and related work on OFAH-Rural portion of Knox County Road 6. 75745~|~1~|~2~|~02/IMS~|~Repair and Resurface I-71 in Clinton and Greene Counties. Also, resurface the ramps at the SR 72 interchange. The locations for the pavement areCLI-71 between SLM 7.27 to 15.39; and on GRE-71 between SLM 0.0 to 4.01. 75745~|~1~|~1~|~01/IMS~|~Widen the mainline bridges including CLI-71-0725 (sfn 1401653), CLI-71-1212L (1401807), CLI-71-1212R (1401831), CLI-71-1237 (1401866), CLI-71-1399L (1401890), CLI-71-1399R (1401920), CLI-71-1421 (1401955), GRE-71-0150 (2901714), GRE-71-0253L (2901749), GRE-71-0253R (2901773), GRE-71-0299 (2901803), GRE-72-0029 (2901838) 93283~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) 3002586 GUE SR209 5.29 Intersect: I-77 Over Sr 209 & 821; Not BR Eligible for Rehabilitation: Length=148 SD/FO(0) SR=88.1 DSR=6; 2) 3002616 GUE SR209 5.29 Intersect: I-77 Over Sr 209 & 821; Not BR Eligible for Rehabilitation: Length=148 SD/FO(0) SR=92.0 DSR=6; 120921~|~1~|~1~|~01/NFP~|~Plan split for bridge operations 88819~|~1~|~1~|~01/SAE~|~District Wide Pavement Marking and RPM contract for FY2017 104834~|~1~|~1~|~01/SAE~|~Upgrade pavement markers on various county roads. 114457~|~1~|~1~|~01/SAF~|~Add sidewalk between Morgan St and Hamilton St on Clay St in Village of Green Springs 115015~|~1~|~1~|~01/STR~|~Bridge replacements 10' to 20' structures. 91781~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. ATH 681 7.79-10.49, MEG 681 0.00-4.76 and 17.49-21.16. Rural other federal aid funded 80 federal/20 state. 100484~|~1~|~1~|~01/STR~|~Crack sealing of various routes in District 11 113964~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 124798~|~1~|~1~|~01/ENH~|~Sidewalk replacement along Broadway Street in the Village of Belle Valley. 121537~|~1~|~1~|~01/SAF~|~Fast Drying Pavement Markers 105148~|~1~|~1~|~01/BRO~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 108158~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER event. 113559~|~1~|~1~|~01/BRO~|~Plan split for bridge work 105661~|~1~|~1~|~01/MPO~|~Mill and resurfacing of W. Second Street including repair of deteriorated curb and inlets from S. Allison Avenue to S. Church Street (US-42). Installation of two Rectangular Rapid Flashing Beacons (RRFBs) at the Creekside Trail crossing. 105661~|~1~|~2~|~02/NFP~|~Resurfacing and base repairs on West Second Street from Massie Drive to S. Allison Avenue. This portion of the project is 100% locally funded (OPWC funds). 105661~|~1~|~3~|~03/MPO~|~Resurfacing and pavement repairs on West Second Street from Progress Drive to Massie Drive. 85273~|~1~|~1~|~01/NHS~|~resurface SAN US 20 27.56 to 30.97 ( RURAL ); East Clyde Corp line to West Bellevue Corp line 85273~|~1~|~2~|~02/NHS/CLYD~|~resurface SAN US 20 26.52 to 27.56; ( URBAN ); East St in Clyde to East Clyde Corp. line 119717~|~1~|~1~|~01/STR~|~Rehabilitate bridge truss 111349~|~1~|~1~|~01/NHS~|~Repair bridge damage caused by a hit by an over height vehicle to BEL-7-22.16 (SFN 0700630) by replacing part of the damaged beam, using Type A emergency. 110423~|~1~|~1~|~01/SAE~|~Construct an RCUT intersection at SR-4 & SR-4 Bypass (northern intersection located northeast of the City of Hamilton in Fairfield Township). 105485~|~1~|~1~|~01/SAF~|~District wide fast drying pavement markers. 111544~|~1~|~1~|~01/MPO~|~TMACOG TAP funded items 109870~|~1~|~1~|~01/NFP~|~D09 Guardrail FY25 90415~|~1~|~1~|~01/NHS~|~Widening of State Route 241 from Raber Road to State Route 619, in the City of Green, Summit County, Ohio. 84476~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7844867 TRU Mayburn Corners Bridge over Sugar Creek. 90670~|~1~|~1~|~01/MPO~|~WOO TR105 2.4-2.42 / WOO TR696 0-0.13WOO Eckel Jnctn/Carronade Intersection improvement 95956~|~1~|~3~|~03/NFP~|~New 60' x 100' fabric salt bilding at 3800 tons. Demolish old salt barn. 95956~|~1~|~1~|~01/NFP~|~New 60' x 100' fabric salt building at 3800 tons. 95956~|~1~|~2~|~02/NFP~|~New 40' x 60' Pole Building with 3 bay cold storage at 2400 square feet. 95956~|~1~|~4~|~04/NFP~|~New 40' x 60' Pole Building with 3 bay cold storage at 2400 square feet. Demolish salt/lean-to building. 86291~|~1~|~1~|~01/IMS~|~Deck replacement on steel beam bridge. Ramp DA 70WB to 315 NB over 315 NB. SFN 2514893 99726~|~1~|~1~|~01/NFP~|~Repairs to the front parking area of the Sunside Trailhead, part of the Trumbull County MetroPark District. 112672~|~1~|~1~|~01/NFP~|~What is in 1.3 of the agreement 89401~|~1~|~1~|~01/STR~|~On SR770, 0.08 mile south of McCreight Bridge Road (TR411) (SLM 2.06 to 2.13), it is proposed to provide support for the shoulder and roadway along the west side of pavement.80/20 split 01/STR/OT/State 121337~|~1~|~1~|~01/NFP~|~Created Plan Split for TID Involvement 101467~|~1~|~1~|~01/STR~|~Raise Pavement Markings 100962~|~1~|~2~|~02/S<2~|~Overlay US 35 in Montgomery County: MOT US 40 SLM 11.69 to 13.33 100962~|~1~|~1~|~01/STR~|~Overlay US 35 in Montgomery County: MOT US 35 SLM 4.05 to 5.75 119283~|~1~|~1~|~01/NHS~|~FRA-315-9.24: place liner in culvert under SR 315 123299~|~1~|~1~|~01/S5K~|~Resurfacing SR 9 and SR 14 in the City of Salem 123299~|~1~|~2~|~02/S5K~|~100% City work, including curb ramps and auxiliary pavement markings 101827~|~1~|~1~|~01/STR~|~Guardrail upgrade project on MEG CR 33A 0.00-3.38. 100% Federal funds, CEAO HSIP. 92515~|~1~|~1~|~01/BRO~|~Bridge Replacement 107932~|~1~|~1~|~01/STR~|~All work in this split. Resurface on SR 49 using district preservation funds (80% fed and 20% state). 102816~|~1~|~1~|~01/STR~|~Soil Nailing project. $200,000 of Capped 4SS7 funds being used. Remaining funds are 4PS7. 105029~|~1~|~2~|~02/NHS~|~Split for pavement work on the NHS 105029~|~1~|~1~|~01/BRO~|~Split for bridge work 105029~|~1~|~3~|~03/NFA~|~Split for work on the new pedestrian bridge over the Grand River. 105029~|~1~|~5~|~05/NFP~|~Split for retaining wall repair 105029~|~1~|~4~|~04/NFP~|~Split for steel storage costs 112820~|~1~|~1~|~01/STR~|~Resurfacing SR 9 98330~|~1~|~1~|~01/STR~|~Plan split to include all costs associated with the scour repair of the WAR-22-10.54 bridge. 90431~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 60 1843 (SFN 5800439). Rural other federal aid funded 80 federal/20 state. 96363~|~1~|~1~|~01/BRO~|~Remove and replace LMC overlay using hydrodemolition, patch or rebuild refaced railing. Check expansion joints are sealed when complete to stop leaking. SFN 1201549, CLA-41-1225 over IR 70. 124389~|~1~|~1~|~01/NFA~|~Bridge work throughout District 5. 119269~|~1~|~1~|~01/STR~|~Tree stump removal and pruning. 101063~|~1~|~1~|~01/S<2~|~Small City 90406~|~1~|~1~|~01/MPO~|~MORPC/Columbus widening of Lazelle Rd with roundabout at S Old State Rd 84531~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. WAS 7 20.37-20.57. NHS Federal/State 80/20%. 84531~|~1~|~3~|~03/NHS~|~Curb ramps within the City of Marietta. Funded 100% local. 84531~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. WAS 7 20.57-21.50, 21.76-21.85, 24.31-24.50. WAS 60 0.18-0.27. Funded 80 federal/20 local. 117907~|~1~|~1~|~01/NFA~|~NEVI Phase 1, I-70-E, 155-160 Musk 121116~|~1~|~1~|~01/S5K/LCEO~|~Rehab of structure 123202~|~1~|~1~|~01/SAF~|~Provide ITS maintenance on various routes in District 6 95977~|~1~|~1~|~01/STR~|~This split is for the building of the south bound left turn lane, new traffic signal, and the minor realignment of TR 1131 to improve the intersectio angle with SR 7. This funding split is capped at $500,000 from the School Entrance Grant (SAC 9SC7) that Beaver local received from the OSFC. The remaining construction contract will be from district SACs 4PF7 & 4PS7 funds. This project is to improve access to TR 1131 due to the new K-12 school campus for the Beaver Local School district being constructed on TR 1131. 103097~|~1~|~1~|~01/STR~|~All items of work on MRW-61 121513~|~1~|~1~|~01/SAF~|~Guardrail replacement & adjustment 124045~|~1~|~1~|~01/S50~|~Plan split for STBG eligible construction items. 124327~|~1~|~1~|~01/ENH~|~Funding splits for TAP/Safety funding for pedestrian improvements 104271~|~1~|~1~|~01/NFP~|~Microsurfacing 118677~|~1~|~1~|~01/BRF/STRU~|~Bridge replacement. 114550~|~1~|~1~|~01/STR~|~AC Overlay without repairs. 114550~|~1~|~2~|~02/S>2~|~AC Overlay without repairs. 114550~|~1~|~3~|~03/S5K~|~Resurface with Asphalt Concrete 25688~|~1~|~2~|~02/S<2~|~D6 federal/state funding for resurfacing from SLM 18.01 (ramps W of US-23) to 18.22 (Pole Lane). Minor bridge work and guardrail over Graves Creek02/S<2/PV/ 25688~|~1~|~1~|~01/SAF~|~100% Safety funding up to safety cap for SLM 17.08 (left Marion Corp) to 18.01 (Ramp W of US-23). Resurfacing, sidewalks, stripe bike lane, drainage, pvmt markings, signing, signals, turn lane, improve drives and intersections. Safety items for entire project01/SAF/OT/ 124621~|~1~|~1~|~01/ENH~|~Primary plan split for SRTS funded part of the project. 89179~|~1~|~1~|~01/CMQ~|~Intersection of Bethany & Mason-Montgomery Roads: 750' on all four approaches to the intersection. Project involves improving the intersection by constructing a two-lane roundabout with two lane approaches and departures, curb and gutter, storm sewers, bike path, sidewalk, a culvert replacement, and necessary utility relocation. 118712~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 7.26-10.722. 118712~|~1~|~2~|~02/S5K~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 10.722-12.04. 105992~|~1~|~1~|~01/S>2~|~Plan split for urban paving work 105992~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work 95742~|~2~|~1~|~01/NHS~|~NHS Portion (US 24 9.64-15.85) 95742~|~1~|~2~|~02/NHS~|~Bridge Split 104668~|~1~|~3~|~03/IMS~|~Bridge rehab - no added capacity 104668~|~1~|~4~|~04/IMS~|~Reconstruction - no added capacity 104668~|~1~|~1~|~01/IMS~|~Bridge work added capacity. 104668~|~1~|~2~|~02/IMS~|~Roadway Added Capacity MCE 5B 104668~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 114870~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. 109367~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 537 0.92. Funded 100% state ER. 112770~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract for FY2026 in D8. Locations to be determined. 101624~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan split for resurfacing on Kno-SR 95-(5.69-11.50) 112324~|~1~|~1~|~01/NFP~|~Bridge Elec. Plans split 114075~|~1~|~1~|~01/S<2~|~Storm Drainage Repair 112389~|~1~|~1~|~01/BRO~|~Invert field paving of corrugated metal pipe bridge carrying SR 39 over Corns Run. 110415~|~1~|~1~|~01/NHS~|~FY23 Urban Paving on SR 4 In the City of Fairfield. 110415~|~1~|~2~|~02/NHS~|~This plan split is for items to be paid 100% by the City of Fairfield. 110415~|~1~|~3~|~03/NHS~|~FY23 Urban Paving on SR 4 in the City of Springfield. 110415~|~1~|~4~|~04/NHS~|~This plan split is for items to be paid 100% by the City of Springdale. 112736~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to MRW-314-20.17 and MRW-314- 25.8 107117~|~1~|~1~|~01/BRO~|~Replace existing bridge CAR-542-0945, SFN 1001981 with new composite precast concrete box beam bridge. 114408~|~1~|~1~|~01/NFP/GCEO~|~"01/NFP/PV/GCEO" resurfacing and related work on CR 73 76778~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using Major Rehab funds. 112171~|~1~|~1~|~01/SAF~|~Implement various traffic signal, signing, and pavement markings upgrades in Eastern Corridor, Segment II/III are, as recommended in the 2019 Implementation Plan (PID 86462) On Large Urban Routes. 112171~|~1~|~2~|~02/SAF~|~Implement various traffic signal, signing, and pavement markings upgrades in Eastern Corridor, Segment II/III are, as recommended in the 2019 Implementation Plan (PID 86462) On NHS Route. 103293~|~1~|~1~|~01/SAF~|~Construction of a roundabout at Cleveland/Massillon and Rothrock Road. 113109~|~1~|~1~|~01/NFA~|~Pavement Split 92014~|~1~|~1~|~01/STR~|~BRO 353 0.00-4.60 92014~|~1~|~2~|~02/STR~|~Bridge preventative maintenance BRO 353 1.26 0803375BRO 353 2.77 0803391BRO 353 2.89 0803413 95175~|~1~|~1~|~01/SAF/LCEO~|~"01/SAF/OT/LCEO" Licking County guardrail project on various county roads funded thru CEAO Safety Dollars 98479~|~1~|~2~|~02/NHS/MUNR~|~Resurfacing, split corp portion in Munroe Falls. 98479~|~1~|~1~|~01/NHS/TALL~|~Resurfacing in the City of Tallmadge, includes split corp section. 114039~|~1~|~1~|~01/S<2~|~Pavement repairs along Fairfield School Road with drainage and curb replacement also along Fairfield School Road and Lisbon Street. (4B97 Small City Program is to provide 95% of the eligible costs, up to a maximum of $1,540,343) 114527~|~1~|~1~|~01/STR~|~Overlay in LAW. 114527~|~1~|~2~|~02/STR~|~Bridge PM 123364~|~1~|~1~|~01/STR~|~Resurfacing SR 165 90590~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MRG CR 2 A. MRG CR 2A 0.00-2.47. Federal 80%/Local 20%. 116696~|~1~|~1~|~01/STR~|~All work is in this split. 121169~|~1~|~1~|~01/NFA~|~Roadway rehabilitation utilizing 100% State CDP funds (4CS7) up to CAP. 110192~|~1~|~1~|~01/S5K~|~SEN-12 from SLM 0.589 - 0.705 110192~|~1~|~2~|~02/NHS~|~SEN-12 from SLM 0.00 - 0.288 and SEN-23 from SLM 11.88 - 12.35 112271~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 144 1.99-2.03. Rural route funded 80 Federal/20 State. 112271~|~1~|~2~|~02/STR~|~High Speed internet costs for field office. 113737~|~1~|~1~|~01/SAF~|~Plan split for safety related items - signal, mast arms and median 95085~|~1~|~3~|~03/NFA~|~Construct a noise wall at the District headquarters 95085~|~1~|~1~|~01/IMS~|~Major new funding for new noise wall at I-270/Linworth 95085~|~1~|~2~|~02/IMS~|~Plan split for noise wall repair on IR 71 due to crash. To be reimbursed by insurance company 115743~|~1~|~1~|~01/IMS~|~Culvert replacement. 122653~|~1~|~1~|~01/NHS~|~D10 Extrusheet Sign FY2026. NHS routes. 122653~|~1~|~2~|~02/STR~|~D10 Extrusheet Sign Replacement FY2026. Rural routes. 107677~|~1~|~1~|~01/STR~|~Resurfacing on SR 37 using district preservation funds (80% 4PF7 and 20% 4PS7). 116029~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " - 4PF7 (80%) and 4PS7 (20%) - district wide spot pavement repair. 120316~|~1~|~1~|~01/S>2~|~Construction of drainage improvements on SR 126 in Miamitown (SLM 1.40 to 1.86). 119602~|~1~|~1~|~01/ENH~|~TLCI items. 96558~|~1~|~1~|~01/NHS~|~Resurfacing of STA US 62 from 37.90 to 38.60. 75559~|~1~|~1~|~01/NFP~|~Block plan split. 75559~|~1~|~2~|~02/NFP~|~add plan sign plan split. 116040~|~1~|~1~|~01/MPO~|~Coy Road Resurfacing 124388~|~1~|~1~|~01/S>2~|~Resurfacing. 124388~|~1~|~2~|~02/NHS~|~Resurfacing. 124388~|~1~|~3~|~03/NFP~|~Pavement repairs and other 100% city items. 124388~|~1~|~4~|~04/SAF~|~Guardrail items. 122855~|~1~|~1~|~01/SAF~|~Funding splits for Safety funded scope 113664~|~1~|~1~|~01/MPO~|~Widening of North Fairfield Road from Fairbrook Elementary School to Plantation Place to provide a center two-way left turn lane. Addition of sidewalk on both sides of the roadway. 112860~|~1~|~2~|~02/S<2~|~Overlay on LAW 7 112860~|~1~|~1~|~01/NHS~|~Overlay on LAW 7 90598~|~1~|~1~|~01/IMS~|~Replace bridge deck:SFN 2512750, FRA-270-3.09, under CR258/Big Run So RdNot BR eligible on 12/7/12 88425~|~1~|~1~|~01/STR~|~Culvert joint repair. VIN 50 21.11 (SFN 8200521) and 21.57 (SFN 8200556). Rural other federal aid funded 80 federal/20 state. 92339~|~1~|~1~|~01/ENH~|~This split is for work approved for funding with Transportation Enhancement funds. Work is for restoration of the Indian Mill bridge over the Sansusky River in Wyandot County. 86656~|~1~|~1~|~01/MPO~|~Widening from 2-5 lanes, the center 12' lane will function as a two-way left turn lane, design of the typical section will include improvemetns such as curb, sidewalk, closed storm drainage, etc. Other improvements to be constructed include utility relocation and aesthetic enhancements on North Dixie Drive between approximately Bartley Road and 1000' South of Benchwood Drive. 86656~|~1~|~2~|~02/CMQ~|~Installation of sidewalks on North Dixie between approx Bartley Road and 1000' South of Benchwood Drive 114913~|~1~|~1~|~01/NFP~|~Crack Seal plan split 115950~|~1~|~1~|~01/STR~|~Asphalt resurfacing project on MOE SR 78 8.13-9.17. Work includes a culvert replacement and flashing signal replacement. Funded through the Local Roads Oil and Shale Program. 115950~|~1~|~2~|~02/STR~|~Reimbursement for materials that were taken into State Inventory. 100% State. 98757~|~1~|~1~|~01/ENH~|~Construction of a new multi-use trail from an existing drieway at Glen Hills Way near Western Hills Sports Mall to an existing trail near the Dunham Recreation Center. 108915~|~1~|~1~|~01/ENH/BUCK~|~Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Sidewalks and Drainage on 1) Lic-SR 79-03.67 to 04.08; 99783~|~1~|~1~|~01/S<2~|~Marion large city funding to resurface SR-95 99783~|~1~|~2~|~02/S<2/Mar~|~!00% City of Marion items 78247~|~1~|~1~|~01/NHS~|~Priority system resurfacing of BEL-7-8.70 to 11.87; includes resurfacing with double microsurfacing, minimal pavement repairs and pavement markings. 107059~|~1~|~2~|~02/NHS~|~Plans split for full depth Shoulder repair on NHS Route: Woo-SR 420 107059~|~1~|~3~|~03/S>2~|~Plan split for Full Depth Shoulder Repair on S>2 Route: Luc SR 64 107059~|~1~|~1~|~01/STR~|~Plan Split for Full Shoulder depth repair on rural routes in Williams, Henry and SR 295 in Lucas county. 104752~|~1~|~1~|~01/SAE~|~plan split 104866~|~1~|~1~|~01/S>2~|~Resurfacing of Commerce between 5th Street and Federal Street in the City of Youngstown, Mahoning County, Ohio. 119099~|~1~|~1~|~01/STR~|~Resurfacing. 96319~|~1~|~1~|~01/STR~|~Resurfacing - Rural:CRA 61 SLM 9.20 - 12.02 RIC 61 SLM 0.00 - 3.12 96319~|~1~|~2~|~02/S<2~|~Resurfacing - Urban: CRA 61 SLM 8.74 - 9.20 (Galion) RIC 61 SLM 3.12 - 3.88 (Shelby) 110962~|~1~|~1~|~01/IMS~|~Split for resurfacing work 82259~|~1~|~1~|~01/NHS~|~Sign Replacement 80195~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement 122136~|~1~|~1~|~01/ERD~|~road diet and buffered bike lane including crosswalk improvements and collection of volume and speed data 122136~|~1~|~2~|~02/SAF~|~80% CEAO HSIP, 20% Local up to $489,600, 100% local after cap and for non-eligible expenses in construction 110009~|~1~|~1~|~01/NFP~|~CrackSeal 107873~|~1~|~1~|~01/NHS~|~All work in this split. Resurfacing of SR15 using district preservation funds at 80% federal and 20% state. 107878~|~1~|~1~|~01/STR~|~District preservation funds. 110851~|~1~|~1~|~01/SAF~|~Safety improvements to IR-71 eligible for federal HSIP funding 107416~|~1~|~1~|~01/NFA~|~Reconstruct Wegman Drive 123881~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 113475~|~1~|~1~|~01/S<2~|~Demo along bypass. 117615~|~1~|~1~|~01/S5K~|~All work is included in this plan split. 83441~|~1~|~2~|~02/S<2~|~Bridge Repair RIC-042-11.95 83441~|~1~|~1~|~01/NHS~|~Bridge Repair RIC-013-14.15 95755~|~1~|~1~|~01/NHS~|~OTT-2 from SLM 10.19 to SLM 14.87 95755~|~1~|~2~|~02/SAF~|~Center Line Rumble Stripe Plan split - OTT - SR 2 - 10.34 to 14.87 84746~|~1~|~2~|~02/NHS~|~Crack Sealing NHS Routes ASD-030-03.82 - 13.32 / HUR-020-16.84 - 28.69 84746~|~1~|~1~|~01/STR~|~Crack Sealing ASD-042-09.39 - 19.35 124866~|~1~|~1~|~01/NFP~|~Sign replacements on various routes throughout District 4. 101363~|~1~|~2~|~02/SAF~|~Shoulder widening along NOB 78 0.00-6.84 using Safety funds. 101363~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. NOB 78 0.00-7.56 and NOB 821 7.47-8.30, 8.63-13.22. Rural other federal aid funded 80 federal/20 state. 106821~|~1~|~1~|~01/BRO~|~Rehabilitate bridge (CAR-9-2165 SFN 1000136) by replacing deck edges, providing new rigid overlay and encasing piles. 121066~|~1~|~1~|~01/NFP~|~bridge rehabilitation 78190~|~1~|~1~|~01/ENH~|~Construction of the Meigs Middleport shared use trail. An STP earmark project. Funded 80 federal/20 local. 123561~|~1~|~1~|~01/IMS~|~LED lighting upgrades 116635~|~1~|~1~|~01/NFP~|~Sign Replacement. 110030~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 78 11.38. Funded 100% State ER. 115390~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR 52 3.82, SFN 5834449. 119451~|~1~|~1~|~01/NFA~|~Install new guardrail along MRG CR 7, 13, 45, 59, 60, 66, 92 and bridge terminal assemblies. Funded 100% Federal. 84379~|~1~|~1~|~01/STR~|~General system preventive maintenance; HAS-22 0.00 to 11.73 97816~|~1~|~1~|~01/ENH~|~Construct Trail Head Facility including parking, shelter, landscaping; construct bik/ped trail to Beehive Coke Ovens. 103295~|~1~|~1~|~01/S<2~|~Slide repair within the corp limits of East Liverpool. 96292~|~1~|~1~|~01/STR~|~Deck replacement on SFN 4002857, SLM 12.45 106823~|~1~|~1~|~01/BRO~|~Rehabilitate existing box beam superstructure on bridge CAR-39-0220 (SFN 1000241) by replacing fascia box beams, the waterproofing and asphalt wearing surface. 85198~|~1~|~1~|~01/SAF~|~Construction of roundabout at the intersection of State Route 619 and McCallum Road (CR19) in the City of Alliance, Stark County, Ohio. 85198~|~1~|~2~|~02/STR~|~Replacing 3 culverts. 117529~|~1~|~1~|~01/STR~|~Culvert replacement. 116991~|~1~|~1~|~01/IMS~|~Plan Split for the large urban locations 97291~|~1~|~2~|~02/NHS~|~Split for work on the NHS 97291~|~1~|~1~|~01/IMS~|~Split for work on the interstate system. 97291~|~1~|~3~|~03/S>2~|~Split for urban STP routes 97291~|~1~|~4~|~04/STR~|~Split for rural STP routes 123165~|~1~|~1~|~01/ENH~|~Continued upgrade of pedestrian connectivity in Village Of Racine. 104487~|~1~|~2~|~02/SAE~|~Safety related items - overhead signs, backplates and countdown ped. heads. 104487~|~1~|~1~|~01/MPO~|~Non-Safety related items plan split 88998~|~1~|~1~|~01/BRF~|~Bridge replacement 118901~|~1~|~1~|~01/STR~|~Resurfacing SR 754 from SR 39 to SLM 0.96 118901~|~1~|~2~|~02/NFA~|~Resurfacing SR 754 from SLM 0.96 to SR 514 99663~|~1~|~1~|~01/STR~|~SEN-12 @ 4.0 84574~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 550 10.56-19.26. Rural other federal aid funded 80 federal/20 state. 84574~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 550 19.26-21.75 and 21.83-21.86. NHS route. Federal 80% and State 20% funding. 117931~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance. 108388~|~1~|~1~|~01/NFA~|~The VILLAGE will repair CR3 and any damaged storm sewers following the installation of a 24? water line running from US224 north to the Village of Leipsic reservoir 116750~|~1~|~1~|~01/STR~|~Resurfacing. 95541~|~1~|~1~|~01/STR~|~General System Resurfacing including pavement repairs and pavement marking on HAS-342, HAS-800 and TUS-342. 95541~|~2~|~2~|~02/STR~|~Work involving pavement repairs in the Village of Freeport and funded entirely by the Village of Freeport. 112362~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " Plan Split 1 90849~|~1~|~2~|~02/STR~|~This split is for work outside the Lima Urbanized Area and will use rural STP funds. It covers the section of SR 309 from 0.00 to the Lima Urbanized Boundary at Wapak Road which is at 5.60. 90849~|~1~|~4~|~04/NHS~|~Work that is is the responsibility of the District to pay for. It covers work on SR 309 starting at the Lima Urbanized Boundary at Wapak Road which is at 5.60 and going to the east to the end of the project. No local funds. Federal NHS funds. 90849~|~1~|~5~|~05/CMQ~|~This is for the costs associated with the construction of sidewalks. Work is along SR 309 from Pioneer Road at SLM 7.17 to Eastown Road at SLM 8.67. MPO-CMAQ funds will be used here. The MPO has approved the use of Toll Credit with those MPO-CMAQ funds. Funds over the CMAQ cap will be from the District Preservation Program budget. In return for the MPO-CMAQ funds in this Plan Split, the District will provide in District Preservation Program funds to be used in the MPO Plan Split. The CMAQ eligibility was approved April 8, 2015. 90849~|~2~|~6~|~06/SAF/ELID~|~Funding from the Safe Routes to School program. Work along Pioneer Road (TR 102) from 0.00 to 0.38 and along Sunnydale Road (TR 104) from 0.00 to 0.10. 100% federal funds with Toll Revenue Credit until cap is reached. The amount over the SRTS is the responsibly of the Village of Elida. The work in this split was designed under ALL SRTS Elida Sidewalks, PID 90954. 90849~|~1~|~3~|~03/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7. Work to replace a culvert near SLM 0.60 on SR 309. 90849~|~1~|~1~|~01/MPO/ELID~|~This split is for curb, gutter and drainage work that will be the responsibility of the Village of Elida to pay for. The work is along SR 309 between SLM 6.10 and Pioneer Road at SLM 7.17. All work in this split is in the Village of Elida. The District will provide District Preservation Program funds SACs 4PF7 and SAC 4PS7 for this split in return for the MPO-CMAQ funds in the CMAQ Plan Split. The MPO will provide MPO-STP funds for this Plan Split. The MPO has agreed to provide Toll Credit for use with the MPO-STP funds. Funds needed after the District and MPO funds are used will be provided by the Village of Elida. Paving work paid with District Preservation Program funds is in other splits. 105749~|~1~|~1~|~01/NFP~|~Districtwide Systematic Sign Replacement 94221~|~1~|~1~|~01/NHS~|~Bridge inspection on NHS bridges 94221~|~1~|~2~|~02/IMS~|~Bridge inspection on IR bridges. 117583~|~1~|~1~|~01/MPO~|~Plan split for TLCI funded eligible work for sidewalk installation. 96060~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Plan Split for construction of Sanitary Sewer Line form D-05 Complex to newly installed Licking County Sanitary Sewer System. 107674~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 from the beginning of the project until the Delphos Urban Boundary at 10.13 using district preservation funds (80% 4PF7 and 20% 4PS7). 107674~|~1~|~2~|~02/S5K~|~Resurfacing on SR 66 from the Delphos Urban Boundary at 10.13 until the end of the project using district preservation funds (80% 4PF7 and 20% 4PS7). 83545~|~1~|~1~|~01/NFA~|~Superstructure replacement project. Existing piers to be evaluated for use with new superstructure. HOC CR 33A 1.00, SFN 3730328. CEAO funded project. Federal 80%/Local 20%. 124046~|~1~|~1~|~01/NFP~|~Plan split for pavement markings on various routes throughout District 12 102547~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of HAM US 52 94387~|~1~|~1~|~01/STR~|~General System Resurfacing - Rural 94387~|~1~|~2~|~02/STR~|~ERI-113-14.06 SFN: 2203006Bridge Work 108463~|~1~|~1~|~01/STR~|~PIK CR 50 3.40 ER repair 98477~|~1~|~1~|~01/STR~|~LOR-162-0.00-8.79 Resurfacing 110370~|~1~|~2~|~02/STR~|~CEAO resurfacing funds plans split for Rural section 110370~|~1~|~1~|~01/S5K~|~CEAO resurfacing plans split for Urban sections; CR304 from 1.35 to 1.76; and on CR309 from 7.54 to 8.6. 114293~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8. 97858~|~1~|~1~|~01/NHS~|~Resurfacing along SR 16 and SR 79. Minor bridge maintenance on SR 16 and SR 79. 117559~|~1~|~1~|~01/ENH~|~SRTS eligible work 116041~|~1~|~1~|~01/NFA~|~Culvert replacement project. NOB 146 1.95, CFN 1838570. Not on the federal aid system. 98917~|~1~|~1~|~01/NHS~|~Repair impact damage to the MOT-35-1344 (SFN 5701589) girders above the Eastbound outside lane. 87611~|~1~|~2~|~02/S<2~|~"02/S<2/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the OFAH-Urban Routes 87611~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the NHS System 87611~|~1~|~3~|~03/STR~|~"03/STR/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the OFAH-Rural Routes 87611~|~1~|~4~|~04/IMS~|~"04/IMS/OT/ " - District Preservation - 4PF7 (90% Federal) / 4PS7 (10% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the Interstate Routes 87611~|~1~|~5~|~05/NFA~|~"05/NFA/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the NOFAS-Rural Routes 113773~|~1~|~1~|~01/NFP~|~Construction of a concrete pad approximately 20,000 SF. 50% Maritime Assistance Program 50% local funds. 96121~|~1~|~1~|~01/IMS~|~Replace headwall and repair erosion on culvert at FRA-670-0.31 108804~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project. Work includes asphalt mill/fill, guardrail replacement and shoulder rehabilitation. WAS IR 77 0.00-6.63. 90% Federal and 10% State funds. 108804~|~1~|~2~|~02/IMS~|~Replace the standard thermoplastic pavement marking with thermoplastic pavement markings containing wet reflective elements installed into a groove in the pavement. Change Order. 89197~|~1~|~1~|~01/S>2~|~80/20 funding split using State District Preservation funding 89197~|~1~|~2~|~02/S>2~|~100% local participation only 107978~|~1~|~1~|~01/NHS~|~Urban paving resurfacing 81749~|~1~|~1~|~01/IMS~|~Unfunded 270 North Project G270/315 interchange 83307~|~1~|~1~|~01/ENH~|~BRO CR62 0.08-0.19 Ripley Main St Street ScapeTE project. Street Scape. 80/20 split with local match by Ripley. 01/ENH/OT/Ripley 124594~|~1~|~1~|~01/SAF~|~Sidewalk and road diet along Duck Creek Rd. 97159~|~1~|~1~|~01/S>2~|~Guardrail replacment on various routes throughout Stark County. 94467~|~1~|~2~|~02/S<2~|~Preventive Maintenance Crack Sealing: RIC-42-2.80-3.06 94467~|~1~|~3~|~03/S>2~|~Preventive Maintenance Crack Sealing: MED-3-8.03-9.86 94467~|~1~|~4~|~04/NHS~|~Preventive Maintenance Crack Sealing: ASD-224-11.55-13.71 / RIC-42-3.06-3.48 / MED-42-3.06-6.91 / MED-224-10.45-16.36 94467~|~1~|~1~|~01/STR~|~Preventive Maintenance Crack Sealing: ERI-113-9.64-11.60 / MED-3-6.98-8.03 / MED-3-18.03-19.84 / MED-57-18.69-20.67 / RIC-13-21.69-32.63 / RIC-42-0.00-2.80 / MED-42-2.79-3.06 94467~|~1~|~5~|~05/IMS~|~Preventive Maintenance Crack Sealing: LOR-90-11.90-18.61 104674~|~1~|~1~|~01/IMS~|~This plan split covers all roadway work that adds capacity. This includes all of the 670/270/62 interchange work, except the structures. 104674~|~2~|~6~|~06/IMS~|~Part 2 pavement resurfacing 104674~|~2~|~7~|~07/IMS~|~Part 2 bridge preservation work 104674~|~1~|~5~|~05/IMS~|~This plan split covers the ITS work for the project, and is categorized as adding capacity. This includes overhead gantries, comms lines, and cameras. 104674~|~1~|~2~|~02/IMS~|~This plan split is to address the resurfacing of IR 670 with the project, funded by District preservation. 104674~|~1~|~4~|~04/IMS~|~This plan split covers all preservation work on structures (does not add capacity). This includes sealing of the existing structures. 104674~|~1~|~8~|~08/NHS~|~New structures FRA-62-2216 (Ramp M over US 62) and FRA-62-2226 (Ramp M over Ramp N) 104674~|~1~|~3~|~03/IMS~|~Widening US62/IR 270EB structure over IR 270 104674~|~1~|~9~|~09/SAF~|~Payment of law enforcement officers to monitor operation of Smart Lane when it is put into operation 104674~|~1~|~10~|~10/IMS~|~Repair damage caused by vehicle accidents. 97620~|~1~|~1~|~01/NHS~|~Resurfacing TRU-SR 11SB from 3.74 to 7.68 and TRU-SR 11NB from 3.86 to 7.68. 97620~|~1~|~2~|~02/NHS~|~See linked structure > 20' span. 97620~|~1~|~3~|~03/NHS~|~See linked structure 10' to 20' span. 100756~|~1~|~1~|~01/MPO~|~Public art investment along GCRTA's Red Line transit line eligible for MPO funding. 95658~|~1~|~1~|~01/S>2~|~Demolition of buildings on 7 parcels. 102322~|~1~|~1~|~01/NFA~|~Replace Superstructure on County Road. 93122~|~1~|~1~|~01/STR~|~STP Rural (District Allocation) Resurfacing: RIC-314-0.00-1.76, RIC-314-5.22-9.49 93122~|~1~|~4~|~04/S<2~|~STP<200,000 (District Allocation) Resurfacing outside City Limits: RIC -314-1.76-3.02, RIC-314-3.02-5.22 LT, RIC-314-9.49-10.01 93122~|~1~|~2~|~02/S<2~|~STP<200,000 (80% District Allocation/ 20% Local) Resurfacing within Ontario City Limits: RIC-314-3.02-5.22 RT 93122~|~1~|~3~|~03/S<2/ONT~|~City of Ontario Costs within City Limits (SLM 3.02-5.22 RT) 93122~|~1~|~5~|~05/NHS~|~Bridge workSFN: 7006012 (RIC-30-4.26) 90942~|~1~|~1~|~01/IMS~|~Bridge Replacement (90/10 Fed/State 4PS7/4PF7): SFN 4704894 and SFN 4704924 90942~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 114767~|~1~|~1~|~01/NHS~|~PIK 32 Double micro 114767~|~1~|~2~|~02/NHS~|~Bridge maintenance work. 88601~|~1~|~1~|~01/STR~|~Replace slab bridge over Norton Run SFN 2102676 DEL 229-0.20 122953~|~1~|~1~|~01/S5K~|~Resurfacing and other improvements to East 5th Street in the City of Marysville. 86702~|~1~|~1~|~01/BRO~|~Brdg Replacement. 4401204 LAW SR7 0.27 Intersect: Buffalo Creek0.27 mile north of US52. 80 Fed/20 State. 01/BRO/BR/State 111577~|~1~|~1~|~01/BRF/NEWL~|~Village of New Lexington Municipal Bridge Funding - 4R87 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments ? Replacement of SFN 6460607 carrying Nuzum Street over Rush Creek in the Village of New Lexington. BR Eligible L=43; SD/FO = 1; DSR = 4; SR =19.6; 117574~|~1~|~1~|~01/NFA~|~Structure replacement - complete replacement of existing 49-foot structure, including abutments and approach work. 84070~|~1~|~1~|~01/STR~|~Culvert @ SLM 11.51 123190~|~1~|~1~|~01/S5K~|~Chip seal. 123190~|~1~|~2~|~02/STR~|~Chip seal. 101900~|~1~|~1~|~01/ENH~|~Rehabilitation of the Hocking Valley Scenic RR. Federal TAP funds at 80% rate, 15% of TRC and 5% local. Final funding is 95% Federal and 5% Local. 100048~|~1~|~1~|~01/NHS~|~Remove and replace 24" storm sewer pipe on the west side of SR 48 94732~|~1~|~1~|~01/IMS~|~New ramps 94732~|~1~|~2~|~02/IMS~|~SFNs: 4801016, 4801040 new bridgesSFN: 4807863 widen existing bridge. 84666~|~1~|~1~|~01/S<2~|~Urban paving 84666~|~1~|~2~|~02/S<2/BUC~|~100% City of Bucyrus items 84666~|~1~|~3~|~03/S<2~|~S<2 segment outside CIty Limits 84666~|~1~|~4~|~04/S<2~|~100% state items 87188~|~1~|~2~|~02/NHS/LIMA~|~This split is for resurfacing work inside the City of Lima. The City of Lima will provide the 20% non-federal match. The District will provide the federal funds from the District Preservation Program SAC 4PF7. The split covers all pavement work on SR 65 from the beginning of the project to Northern Avenue at 8.98. It also covers work along the west side of SR 65 from Northern Avenue at 8.98 to Brower Road at 9.35 and the east side of SR 65 from Chapman Road at 9.27 to the coporation limits at 11.10. 87188~|~1~|~4~|~04/S<2~|~Resurfacing of SR 81 in Allen County from Wapak Road at 11.34 to Eastown Road at 13.47. Work is inside the Lima Urbanized Area but outside of the City of Lima. All funds are from the District Preservation Program Funds budget. No local funds. 87188~|~1~|~1~|~01/NHS~|~This is for work outside the City of Lima but inside the Lima Urbanized Area. It covers work along the east side of SR 65 from Northern Ave. at 8.98 to Chapman Road at 9.27. It also covers work along the west side of SR 65 from Brower Road at 9.35 to the end of the project. It covers all work north of the corportation limits at 11.10 on both sides of the road. All funds in this split are from the District Preservation Program budget 80% 4PF7 and 20% 4PS7. There are no local funds in this split. 87188~|~1~|~3~|~03/MPO/LIMA~|~Funds provided by the City of Lima and the Lima MPO. MPO-STP funds can be used at a 100% rate. The use of Toll Credit has been approved. Funds needed over the MPO-STP cap are to be provided by the City of Lima. Covers non-resurfacing work such as curb & gutter, drainage and auxilary pavement markings inside the City of Lima, including along the City of Lima side of the road where the coprporation limits split the road. Covers non-resurfacing work on both sides of SR 65 from the begining of the project to Northern Avenue at 8.98. It also covers non-resurfacing work along the west side of SR 65 from Northern Avenue at 8.98 to Brower Road at 9.35 and the east side of SR 65 from Chapman Road at 9.27 to the corporation limits at 11.10. All the discussed sections of SR 65 in this split are on the NHS. 87188~|~1~|~6~|~06/CMQ~|~This is for sidewalks along SR 65 outside the City of Lima but inside of the Lima Urbanized Area. Funds provided by ODOT District 1 and the Lima MPO. The MPO-CMAQ funds can be used at 100%. The use of Toll Credit has been approved. Funds needed over the cap will be from the ODOT District 1 Preservation Program budget. All of SR 65 in this split is on the NHS. The sidewalks are north of Brower Road along the west side of SR 65. 87188~|~1~|~5~|~05/CMQ/LIMA~|~This is for sidewalks inside the City of Lima along SR 65. Funds provided by the City of Lima and the Lima MPO. The MPO-CMAQ funds can be used at a 100% rate. The use of Toll Credit has been approved. Funds needed over the cap will MPO-STP funds no used in other events. Additional funds needed after all federal funds are used are to be provided by the City of Lima. All of SR 65 in this split is on the NHS. 102067~|~1~|~1~|~01/NFP~|~Various CR and TR. 105174~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route: LOC SR 347 SLM 3.63 to 5.73. 106278~|~1~|~1~|~01/NFP~|~Replacing guardrail on various routes throughout District 4. 98826~|~1~|~1~|~01/BRO/MTVE~|~City of Mount Vernon Municipal Bridge Funds - 4R87 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of SFN 4232712 carrying CR 503 over the Kokosing River. 98826~|~1~|~2~|~02/ENH/MTVE~|~City of Mount Vernon Transportation Alternatives Funding - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Providing Multi-Trail connectivity from existing trails to the structure replacing SFN 4232712 carrying CR 503 over the Kokosing River. 96919~|~1~|~1~|~01/SAE~|~Pavement Marking 87327~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 20.36-22.15, includes Gallipolis Village. Urban other federal aid funded 80 federal/20 state. 87327~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 16.03-20.36. Also includes asphalt overlay on deck of bridge GAL 141 1373, SFN 2701715. Rural other federal aid funded 80 federal/20 state. 83630~|~1~|~2~|~02/NHS~|~80/20 fed/state funding split for all work from US-422 to Washington St (old 422), SLM 2.57 to SLM 2.81, using federal NH funds. 83630~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work from the county line to US-422, SLM 0.00 to SLM 2.57, using federal STP funds. 121067~|~1~|~1~|~01/CMQ/MACE~|~Intersection improvements on Highland Rd at SR 8 and S Bedford Rd. 93626~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds. 101868~|~1~|~1~|~01/NFA~|~LAW CR 410 / TR 1012 intersection improvement. 116146~|~1~|~1~|~01/BRF/AKRO~|~Deck and approach slab replacement. 81638~|~1~|~3~|~03/NHS~|~Plan Split covering pavement markings. 81638~|~1~|~5~|~05/S>2~|~SFN 5000572 & 5000602 MAH SR 11 10.10 L & R over US 62. 81638~|~1~|~1~|~01/NHS~|~Plan Split for Paving MAH SR 11 from 0.00 to 8.46 81638~|~1~|~4~|~04/IMS~|~SFN 5029430 MAH-SR 11-9.39 over Ohio Turnpike. 81638~|~1~|~2~|~02/NHS~|~Plan Split for SFN 5000211 MAH SR 11 01.01 under Garfield Rd, SFN 5000246 MAH SR 11 01.47 under Renkenberger Rd, SFN 5000483 MAH SR 11 07.59 under Leffingwell Rd, SFN 5000726 MAH-SR 11-14.55L over Norquest Blvd, and SFN 5000750 MAH-SR 11-14.55R over Norquest Blvd. 118660~|~1~|~1~|~01/S5K~|~Repair of MUS-22-11.59 structure (SFN 6000495) 112750~|~1~|~1~|~01/NFP~|~CrackSeal 106722~|~1~|~1~|~01/BRF~|~Rehabilitation of the bridge size culvert (SFN: 8362238) that carries Innovation Way over Union Run. 121083~|~1~|~1~|~01/NFP~|~PM 2023 plan split. 121370~|~1~|~1~|~01/NFP~|~FY27 Bridge Holder 114905~|~1~|~1~|~01/STR~|~Rural plan split 114905~|~1~|~2~|~02/S>2~|~OTT-51 from SLM 7.90 to 10.385 99844~|~1~|~1~|~01/BRO~|~Bridge Repair from accident damage.LOR-20-9.99 (SFN 4701917) 107411~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail on various county roads. 107411~|~1~|~2~|~02/SAF~|~Install new and upgrade existing guardrail on various county roads. 85371~|~1~|~1~|~01/S>2~|~Funding split for paving work on the Urban STP portion of the project from SLM 6.00 to 9.49. 85371~|~1~|~2~|~02/NHS~|~Split for paving work on NHS section from SLM 9.49 to 10.08. 85371~|~1~|~3~|~03/NFP~|~100% local participation which are not eligible for Urban Paving funding. 121253~|~1~|~1~|~01/SAF~|~Systematic sign upgrades in Clinton Co 99441~|~1~|~1~|~01/MPO~|~Demolition of structures acquired by the City of Cincinnati as part of their HAM-CR 612-0.20 project (PID 87036). 111218~|~1~|~1~|~01/IMS~|~Resurfacing of Kenmore SB ramp to IR-277 EB in the City of Akron, Summit County, Ohio. 107742~|~1~|~1~|~01/NFA~|~The Village will extend N. West St 1925 ' from Jackson St to Baker Rd. The street will be constructed to include a 33' asphalt pavement width designed for commercial/industrial traffic loads with 2' concrete curb and gutter, storm sewer and catch basins. 88550~|~1~|~1~|~01/ENH~|~Freedom Secondary Trail Ph 2 102934~|~1~|~1~|~01/STR~|~STP Rural eligible. 99505~|~1~|~1~|~01/NFA~|~The City is improving 1000 feet of Ottawa street with will serve as a new gateway to the Owens Coring World Headquarters. 112556~|~1~|~1~|~01/S>2~|~resurfacing on the urban portion 112556~|~1~|~2~|~02/STR~|~resurfacing on the rural portion 99764~|~1~|~1~|~01/NFA~|~Ross Industrial Parkway. 108760~|~1~|~1~|~01/BRF/KCEO~|~Knox County CEAO Federal/State Exchange Program - 4C87 (State 80%) / LNTP (Local 20%) - See CAP Comments - Replacement of Kno-TR 402-00.06 SFN 4237064 Coffing Road over Granny Creek 97357~|~1~|~1~|~01/NFP~|~Tree/bush removal, pruning 117172~|~1~|~1~|~01/ENH~|~MEG-Middleport Streetscape Ph 1. Reconstruction of sidewalks and curb ramps. 119833~|~1~|~1~|~01/S>2~|~Safety and pedestrian improvements on 17th Avenue 89853~|~1~|~2~|~02/SAE/GCEO~|~"02/SAE/OT/GCEO" County Engineer's Association Organization Guardrail Upgrade 4HB7(100% Federal) - CAP of $600,000.00 federal - Guardrail on Major Collector with Guernsey County. 89853~|~1~|~1~|~01/NFA/CCEO~|~"01/NFA/OT/CCEO" - County Engineer's Association Organization Guardrail Upgrade 4HB7(100% Federal) - CAP of $600,000.00 federal - Guardrail replacement and upgrade on routes to be determined in Coshocton and Guernsey Counties. 112415~|~1~|~1~|~01/CMQ~|~Plan split for tunnel extension using CMAQ funds. 107690~|~1~|~1~|~01/NHS~|~WOO-6-14.82 108507~|~1~|~1~|~01/STR~|~Culvert Replacement 119514~|~1~|~1~|~01/S>2~|~FRA Ferris Road (CR 172) from Minnie Road to Cleveland Ave. 101215~|~1~|~1~|~01/NHS~|~US 20 resurfacing of 2.24 miles. 86649~|~1~|~2~|~02/IMS~|~D6 funding for patching and sealing on 1 structure:2502844 FRA IR270 21.8 Intersect: Over I-270 86649~|~1~|~3~|~03/NHS/COLS~|~100% City of Columbus items SLM 17.57-18.63 & 21.40-22.45 86649~|~1~|~1~|~01/NHS~|~Columbus urban paving of US-40/E Main St from SLM 17.57-18.63 & 21.40-22.45 98719~|~1~|~1~|~01/BRO~|~Bridge Work - No Added Capacity 100323~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay on TRU SR 7 from 5.66 to 8.75 and TRU SR 46 from 7.08 to 7.30. 100323~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to TRU SR 46 7.30 to 13.39. 122234~|~1~|~1~|~01/NFA~|~NEVI Round 2B 8 30-A 122234~|~1~|~2~|~02/NFA~|~NEVI Round 2B 30-A 105232~|~1~|~1~|~01/S>2~|~Resurfacing. 93956~|~1~|~2~|~02/NFP~|~From SLM 19.45 to SLM 20.65 for items beyond curbs and deeper than 3.5" 93956~|~1~|~1~|~01/S>2~|~US-24 from SLM 19.45 to 20.65. This is for Urban Paving work items located in the area from face of curb to face of curb to a depth of 3.5". 105306~|~1~|~1~|~01/NHS~|~US-23 in Fostoria. 77545~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete from the DAR/SHE County Line to 0.59 mile East of the junction of SR 66 (SLM 4.53) SHE-SR-47 0.000 to 4.510 0.000 to 4.510 9.02 Lane miles 100625~|~1~|~1~|~01/STR~|~Resurfacing TUS-258 from CR 3 to GUE Co. Line and GUE-258. 100625~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 100349~|~1~|~1~|~01/NHS~|~District capital allocations for resurfacing of US23 from SLM0.00 to SLM6.65. 101341~|~1~|~1~|~01/NHS~|~Plan split for all work associated with HEN-6-1722 relining 100813~|~1~|~1~|~01/STR~|~Replace bridge size culvert 115783~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 115783~|~4~|~2~|~02/NFA~|~Gahanna SIB Loan 115783~|~1~|~3~|~03/NFA~|~Gahanna SIB Loan 119202~|~1~|~1~|~01/STR~|~Rural plan split 97280~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 119086~|~1~|~1~|~01/S>2~|~Resurfacing. 119086~|~1~|~2~|~02/STR~|~Resurfacing. 98763~|~1~|~1~|~01/S<2~|~Installation of fiber optic interconnect cable to connect the signalized intersections within Sycamore Township. PTZ cameras will also be installed at several signalized intersections. 91060~|~1~|~1~|~01/SAF~|~Widen Fields Ertel Road to provide a right turn lane to northbound I-71, restripe Fields Ertel and Mason Montgomery intersection, widen Gregory for an additional northbound lane and restripe the Gregory and Fields Ertel intersection. Apply access management principles on Fields Ertel from the southbound I-71 on ramp to Royal Point Drive. 100959~|~1~|~1~|~01/IMS~|~TRU IR 80 from 4.71 to 8.56. 22891~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1806637 94219~|~1~|~1~|~01/NFP~|~District wide pavement marking and raised pavement marking contract for FY2019. Locations to be determined. 114099~|~1~|~1~|~01/SAF~|~Safety funded plan split 108813~|~1~|~1~|~01/BRO~|~Replace superstructure on bridge CAR-43-0391 (SFN 1000748). 85601~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds on urban section. 85601~|~1~|~2~|~02/STR~|~80% federal / 20% state funding split for all work using federal STP funds on rural section. 93493~|~1~|~1~|~01/BRO~|~Plan split for all costs associated with structre DEF-66-0149. 100185~|~1~|~1~|~01/S<2~|~Work on Industrial Drive and Production Drive which are both Major Collectors in the Findlay Urban Area. 80% federal funds from the City of Findlay Large City budget with the 20% match being local funds provided by the City of Findlay. 93484~|~1~|~1~|~01/IMS~|~Culvert Liner - State Term contract 117051~|~1~|~1~|~01/IMS~|~Split for bridge work 109848~|~1~|~1~|~01/NHS~|~Type A temporary pavement repair. 21492~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Annual contract for placement of Spray Thermoplastic Striping within District 5 on IR; US; and SR 92654~|~1~|~3~|~03/BRO~|~Deck sealing and minor work to SFN 7804652, BR Rehab eligible. 92654~|~1~|~2~|~02/NHS~|~See linked structures > 20'. Non-BR eligible. 92654~|~1~|~1~|~01/NHS~|~Resurfacing of State Route 82, from SLM 17.47 to SLM 22.74, in Howland and Vienna Townships, Trumbull County, Ohio. Includes minor work to SFN 7804733 (12 ft) Structure. 122451~|~1~|~1~|~01/NHS~|~Eliminate scour at bridge BEL-7-2497 carrying SR 7 over Patton Run and TR 469 by reestablishing the banks of Patton Run and fore slope of TR 469. The project will protect against future scour by placing rock channel protect along the banks of Patton Run. 109455~|~1~|~1~|~01/SAF~|~Safety, Intersection Improvement 109455~|~1~|~2~|~02/STR~|~Rural Lorain County Water Authority (RLCWA) will be responsible for paying for all the waterline relocation work. 104277~|~1~|~1~|~01/NFP~|~Reactive Pavement Maintenance 110277~|~1~|~1~|~01/CMQ~|~Construction of sidewalks in the City of Lima. 124658~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded work 93093~|~1~|~1~|~01/STR~|~Bridge Deck Replacement 122415~|~1~|~1~|~01/IMS~|~Plan split for guardrail replacement 122415~|~1~|~2~|~02/S>2~|~Plan split for guardrail repair component of the plan set 123865~|~1~|~1~|~01/NFA~|~Lanterman Rd resurfacing. 106670~|~1~|~1~|~01/NFP~|~Work to rehab a bridge. State funds from the Federal/State Exchange Program with the local match provided by the Defiance County Engineer. 104062~|~1~|~1~|~01/S<2~|~Landslide repair. 101183~|~1~|~1~|~01/NHS~|~Pavement plan split for SR 104 per 7/20/15 spreadsheet. 103371~|~1~|~1~|~01/CMQ~|~Conversion of the existing stop controlled intersection of Butler Warren Road and Western Row Road/Barret Road) to a modern roundabout. 106592~|~1~|~1~|~01/SAF~|~Improve BUT-122 from west of Hursch to east of Michael to address fixed object crashes. 109043~|~1~|~1~|~01/STR~|~Landslide repair. 89482~|~1~|~1~|~01/STR~|~Rural route GSMP Funds. retaining wall failure. remove exisiting wall and flatten out embankment. 80963~|~1~|~1~|~01/SAF~|~Adding left turn lanes on the US 422 approaches to Main Market Road 87393~|~1~|~1~|~01/NFA~|~LAW SR775, 12.84 Slide repair. 3.83 miles south of S.R. 141 intersection 100% state01/NFA/OT/State 81866~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation 4PS7(State 100%) - No CAP - Auxillary Pavement Markings on various routes in District 5 100790~|~1~|~1~|~01/NFP~|~RPM contract 102048~|~1~|~1~|~01/NFA~|~The city of Northwood is working with the developer of McNerney Industrial Park to extend a new road (Commercial Blvd) north of McNerney road 650 feet in order to provide access for new industrial growth. 124996~|~1~|~1~|~01/NFA~|~Various CR GR FY 2029 106490~|~1~|~1~|~01/NFP~|~All work in the project. 107487~|~1~|~1~|~01/STR~|~Resurfacing BEL-149 107487~|~1~|~2~|~02/NFA~|~Resurfacing SR 147 from SR 149 to SR 9 102037~|~1~|~1~|~01/NFA~|~Bridge replacement plan split for local birdge. 96103~|~1~|~1~|~01/NFP~|~36" pipe 117941~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. 96974~|~1~|~1~|~01/IMS~|~Traffic Signal upgrades on various routes throughout District 4. 92222~|~1~|~1~|~01/IMS~|~100% state funded plan split for all work using state district allocation funds. 121878~|~1~|~1~|~01/STR~|~Reconfigure the intersection to a traditional four-way intersection 112842~|~1~|~1~|~01/NFP~|~All work in this project. 116830~|~1~|~1~|~01/ENH/STRU~|~Sidewalk upgrades/repairs. 101768~|~1~|~1~|~01/BRO~|~Replace existing deck on bridge carrying SR 39 over Riley Run. 114401~|~1~|~1~|~01/NFP~|~Culvert Lining 110376~|~1~|~1~|~01/SAF/Cols~|~Intersection improvements at Maple Canyon 109746~|~1~|~1~|~01/STR~|~AC overlay without repairs 93487~|~1~|~1~|~01/BRO~|~Replacement and widening of sfn# 5003229, structure over IR680-16.32. 124906~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 112211~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-CR 77-5.00 (SFN: 0930288). 98794~|~1~|~2~|~02/S>2~|~Improving US 40 to a five-lane cross section from the new Airpark Blvd. west of the Dayton Interenational Airport to Peters Pike and improving the Interchange at the Airport Access Road and US 40. 98794~|~1~|~1~|~01/NHS~|~Improving US 40 to a five-lane cross section from the new Airpark Blvd. west of the Dayton International Airport to Peters Pike and improving the interchange at the Airport Access Road and US 40. 99981~|~1~|~1~|~01/NFA~|~Old National Road at the Stillwater River - Construction of a covered bridge to enhance existing bikeway/pedestrian access and providge a connection with the regional bikeway ayatem. The bridge would be constructed on the precise location of the former Historic National Road covered bridge. 93272~|~1~|~1~|~01/STR~|~General system paving of MRW-42: 0-12.71 115353~|~1~|~1~|~01/MPO/MOGA~|~Resurfacing, in the Village of Mogadore. 115353~|~1~|~2~|~02/MPO/POCE~|~Resurfacing, Portage County Engineer. 95218~|~1~|~1~|~01/SAE~|~100% CEAO federally funded Safety project 113158~|~1~|~1~|~01/NFP~|~The Village of Evendale will construct a 2-lane extension of Aerohub Boulevard from its existing terminus north for an estimated 1,600 linear feet. 102395~|~1~|~2~|~02/NHS/RAVE~|~POR SR 14 from 9.82 to 10.15, Urban Paving in the City of Ravenna. 102395~|~1~|~1~|~01/NHS~|~POR SR 14 from 6.66 to 9.82 and POR SR 59 from 3.33 to 5.87. 93608~|~1~|~1~|~01/NFA~|~Provide pedestrian facilities and upgraded crossings near schools in the Stow-Munroe Falls school district. 117906~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I70-D LIC/MUS 129-153 77266~|~1~|~1~|~01/IMS~|~IR-76 and State Street Interchange and IR-76 and Wooster Interchange in the City of Barberton, Summit County, Ohio. 101050~|~1~|~1~|~01/STR~|~Overlay SR 29 in Champaign County with smooth seal 114570~|~1~|~1~|~01/STR~|~AC Overlay without repair 100586~|~1~|~1~|~01/NHS~|~Microsurfacing on COL-30 from SLM 0.00 to 8.87 and on COL-9 from SLM 12.28 to 13.06 100586~|~1~|~2~|~02/S<2~|~Microsurfacing of COL-62 from SLM 4.86 to 5.44 and COL-9 from SLM 12.12 to 12.28 100586~|~1~|~3~|~03/STR~|~Microsurfacing of COL-62 from SLM 5.44 to 10.02 and COL-9 from SLM 4.00 to 12.12 112477~|~1~|~1~|~01/MPO~|~Split for MPO-funded work 108464~|~1~|~1~|~01/STR~|~PIK CR 50 2.55 ER repair project. 91005~|~1~|~1~|~01/IMS~|~Overlay IR 75 119504~|~1~|~1~|~01/S>2~|~A safety improvement project on state Route 93 in Lawrence County. Addition of a left turn lane on LAW-93 at the intersection of Porter Gap Rd. 115094~|~1~|~1~|~01/STR~|~Slide repair 109696~|~1~|~1~|~01/NFP~|~Guardrail replacement and repair at various locations 108174~|~1~|~1~|~01/S>2~|~ER repair - repair landslide that occurred along WB US 50. 108174~|~1~|~2~|~02/S>2~|~plan Split for the facia treatment and barrier of the existing crib wall. 83689~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH CR 1A 2.89 (SFN 0530352) and ATH CR 45 0.86 (SFN 0549460). Federal 95% with Credit Bridge and Local share is 5%. 105360~|~1~|~1~|~01/STR~|~Microsurface rural routes: MIA US 40 SLM 4.25 to 6.30 & DAR US 127 SLM 1.23 to 9.52 105360~|~1~|~2~|~02/S>2~|~Microsurface on large urban routes: MIA US 40 SLM 0.00 to 4.25 113754~|~1~|~1~|~01/SAF~|~Pavement marking 113754~|~1~|~2~|~02/SAF~|~Pavement Marking 117462~|~1~|~1~|~01/BRF~|~Bridge rehabilitation (SFN 6530036) 88901~|~1~|~1~|~01/IMS~|~Split for barrier replacement 124213~|~1~|~1~|~01/BRO~|~Bridge replacement with 80% CEAO LBR (4B87) and 20% Local (LNTP) funds. 93858~|~1~|~1~|~01/S>2~|~Project will widen Dayton-Xenia Road (CR-142) to three lanes from Woods Drive to just east of Wallaby Drive to provide a center two-way left turn lane. In addition, the project will add an 8 foot wide sidepath on both sides of the roadway, improved shoulders, and installation of curb and gutter and storm sewer improvements. 101786~|~1~|~1~|~01/NFA~|~The Village is constructing road improvements to support an expansion at the Charter Steel Rolling Mill, opening a new truck only access by widening the current access road off of East 49th into their plant. 105420~|~1~|~1~|~01/STR~|~Repair or replace culverts on rural routes. 99386~|~1~|~1~|~01/STR~|~"01/STR/OT " - plan split for construction of a salt storage building at the existing Baltimore outpost. 98222~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Annual contract for placement of Fast Dry Long Line and Auxiliary Striping within Eastern District 5 84990~|~1~|~1~|~01/BRO~|~Bridge rehab 109299~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail 107718~|~1~|~1~|~01/STR~|~SFN 7203284 105792~|~1~|~1~|~01/BRO~|~Split for bridge work 105792~|~1~|~2~|~02/BRO~|~Split for 100% local work for CEI relocation 105792~|~1~|~3~|~03/BRO~|~Split for 100% local work for Dominion relocation 105792~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 98798~|~1~|~2~|~02/NFA~|~Reconsturcting 3250 feet of Henricks Road between N. Four Mile Road and N Meridan Road 98798~|~1~|~1~|~01/NFA~|~Mahoning County Engineer. 110555~|~1~|~1~|~01/IMS~|~Rehabilitate the Bridge that carries SR 28 over I-275 by overlaying the deck, replacing the barrier and replacing the Vandal Protection Fence. 92835~|~1~|~1~|~01/SAE~|~guardrail 92835~|~2~|~2~|~02/SAE~|~Added plan split for items over the Federal Maximum 92835~|~2~|~3~|~03/SAE~|~Added plan split for CE over the Fed. Max. 100946~|~1~|~1~|~01/S<2~|~This plan split is for the small urban routes. 100946~|~1~|~2~|~02/STR~|~This plan split is for the rural routes. 109592~|~1~|~1~|~01/BRF/STCE~|~Replacement of Farber St structure. 96007~|~1~|~1~|~01/NHS~|~SFN 7200242 87249~|~1~|~3~|~03/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1Brdgs to rehab:7303769 SCI SR139 8.24 Intersect: Branch Long Run7303793 SCI SR139 10.85 Intersect: C&O Railroad7303815 SCI SR139 11.45 Intersect: Rocky Fork Creek7303874 SCI SR139 11.77 Intersect: Yankee Run7303971 SCI SR139 16.49 Intersect: Little Scioto River7305109 SCI SR335 10.3180/20 split 87249~|~1~|~4~|~04/S<2~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1 Urban Area 0.52 - 1.51 Local match of 20%Project Termini: Begin at US52, north for 18.03 miles and terminate at the Jackson County line. 80/20 87249~|~1~|~2~|~02/S<2~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1 Urban Paving (not urban area) 1.51 - 2.72 Project Termini: Begin at US52, north for 18.03 miles and terminate at the Jackson County line. Brdgs to pave thru:7303491 SCI SR139 0.52 Intersect: Trib Of Munn Run7303513 SCI SR139 1.73 Intersect: Stream7303556 SCI SR139 2.68 Intersect: Munns Run80/20 split 87249~|~1~|~1~|~01/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1 Rural Section 2.72 - 18.03Project Termini: Begin at US52, north for 18.03 miles and terminate at the Jackson County line. Brdgs to pave thru:7303572 SCI SR139 4.69 Intersect: South Fork Of Long Run7303602 SCI SR139 4.85 Intersect: South Fork Of Long Run7303629 SCI SR139 5.34 Intersect: Long Run7303653 SCI SR139 5.73 Intersect: Black Long Run7303718 SCI SR139 6.64 Intersect: Butler Run7303734 SCI SR139 7.52 Intersect: Branch Of Long Run7303912 SCI SR139 13.85 Intersect: Stream7303939 SCI SR139 15.07 Intersect: Stream80/20 split 87249~|~1~|~7~|~07/SAF~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 2Safety Description: At the intersection of SR139/Maple-Benner Road SLM (4.98), it is proposed to realign the curve by adjusting the road profile to improve the sight distance.It is also proposed to add 2' wide shoulders from 3.0 to 10.5, and Access Mangement improvements for driveways at SR139 & High Street in Minford.90 Fed/10 state match 87249~|~1~|~6~|~06/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 2 Bridge plan split 3.0 - 10.5 87249~|~1~|~5~|~05/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 2 Pavement plan split 3.0 - 10.5 103825~|~1~|~1~|~01/NFA~|~Bridge repair on non-Federal aide routes. 103825~|~1~|~2~|~02/STR~|~Bridge repair on rural route. 88008~|~1~|~1~|~01/SAF~|~Install 2' paved shoulder laterally along the entire corridor where speed limits exceed 35 MPH 9Log Point 1.71 - 2.82 and Log Point 3.53 - 7.54) and install 4' stabilized/paved shoulder within 250' of the seven unsignalized intersections within the corridor, upgrade the traffic signal at the Spangler Road/Sycamore Street intersection and add an auxiliary signal head for Northbound motorists on Lower Valley Pike in Clark County. 118128~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds. Roads are intermodal route connectors which facilitate direct intermodal interchange, transfer, and access into and out of a port terminal. 118128~|~1~|~2~|~02/NFP~|~100% Locally funded plan split for drainage work 110560~|~1~|~1~|~01/STR~|~HIG-72-5.82 SFN 3601501 Bridge Replacement 117603~|~1~|~1~|~01/STR~|~Replace culvert type bridge carrying SR 152 over Dry Fork. 122153~|~1~|~1~|~01/SAF/HUR~|~Safety resurfacing, shoulders, signs, guardrail, pavement markings. 122153~|~1~|~2~|~02/STR~|~Created 100% Local Plan Split to cover resurfacing costs not funded by safety monies. 121843~|~1~|~1~|~01/S>2~|~resurfacing of Kauffman Avenue between SR 444 and Zink Road 110224~|~1~|~1~|~01/STR~|~Bridge ReplacementBRO CR 24 8.19 (SFN 0834815) & 8.35 (SFN 0834807) 117799~|~1~|~1~|~01/NFP/NALB~|~Reconstruction of Green Chapel Road 91054~|~1~|~1~|~01/S>2~|~Federal/Local (Columbus) urban paving on Town St, SLM 0.00-1.2801/S>2/PV/ 116813~|~1~|~1~|~01/S50~|~This plan split is for the work to update the traffic signal hardware at IR 70 westbound and east off ramps at Mall Road (CR 28A) in Belmont County 101387~|~1~|~1~|~01/S<2~|~S<2 AC Overlay with Repair 101387~|~1~|~2~|~02/NHS~|~NHS AC Overlay with Repair 101387~|~1~|~4~|~04/S<2~|~Structures less than 20'LOR-301-2469 101387~|~1~|~3~|~03/S<2~|~Bridge work for structures over 20'LOR-301-24.99LOR-301-25.99 117878~|~1~|~1~|~01/NHS~|~Widening of SR 161 114110~|~1~|~1~|~01/SAF~|~ Installation of RWR Pavement Markings 100474~|~1~|~1~|~01/STR~|~Microsurfacing of TUS-39 96930~|~1~|~1~|~01/NFP~|~State Project 124060~|~1~|~1~|~01/SAF~|~Pedestrian Improvements on Harmon Rd (TR 221) and Northchester Rd (TR 1249) in Violet Twp. 120109~|~1~|~1~|~01/NFP~|~Resurfacing a park road and parking lot. 113446~|~1~|~1~|~01/SAF~|~Install a new traffic signal at the intersection of West Main Street (SR 41) and Kings Chapel Road. 83775~|~1~|~1~|~01/STR~|~Two-Lane resuracing project using an asphalt overlay treatment. MOE 78 8.13-15.06. Rural other federal aid funded 80 federal/20 state. 91709~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. Rural other federal aid funded Federal 80%, State 20%. 91709~|~1~|~2~|~02/S5K~|~Two-Lane resurfacing project using an asphalt overlay treatment. Urban other federal aid funded Federal 80%, State 20%. HOC 664 16.313-16.775. 91709~|~1~|~3~|~03/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment. Urban paving in City of Logan. HOC 664 15.87-16.313. 91709~|~1~|~4~|~04/STR~|~Two-lane resurfacing projec using an asphalt overlay treatment. HOC 664 23.19-23.27. Funded with PROTECT funds 80%/20% state match. 112608~|~1~|~1~|~01/NHS~|~Improve intersection of US-50 & State Line Road. This PID represents Ohio?s participation in this InDOT-sponsored project. 98463~|~1~|~2~|~02/S<2~|~Resurfacing inside the Kenton Urban Area. Work on SR 67 from 17.55 to the Urban Boundary at 17.87. Funds from the District Preservation Program budget. 80% federal STP funds SAC 4PF7 and 20% state funds SAC4PS7. There are no local funds in this split. Although, the road in this split is inside the Kenton Urban Area,it is outside of the City of Kenton. 98463~|~1~|~1~|~01/STR~|~Resurfacing outside the Kenton Urban Area. Work on SR 67 from the Urban Boundary at 17.87 to 24.79. All work on SR 273, SLM 5.66 to 6.31. Funds from the District Preservation Program budget. 80% Federal rural STP funds SAC 4PF7 and 20% State funds SAC 4PS7. 102390~|~1~|~1~|~01/NFP~|~Raised Pavement Marker (RPM) contract for FY2022. Funded 100% state. 93004~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-SR 79-00.00 to 12.37 120034~|~1~|~1~|~01/S>2~|~Pedestrian improvements at Norton Middle School and Prairie Lincoln Elementary School 121846~|~1~|~1~|~01/MPO~|~milling and resurfacing of Pennyroyal Road from south intersection with Clearcreek Franklin Road to SR 741 108945~|~1~|~1~|~01/CMQ~|~Roundabout construction work eligible for federal-aid 81748~|~1~|~3~|~03/NHS~|~NHS funding for bridge replacement with capacity (not BR eligible):SFN 2510928 FRA-270-22.94A 81748~|~1~|~2~|~02/NHS~|~NHS funded new bridges:SFN 2511061 FRA-270-23.69ASFN 2511053 FRA-270-23.54ANew Retaining walls 12 & 13 for new bridges 81748~|~1~|~5~|~05/NHS~|~NHS funding for bridge rehab/no capacity (not BR eligible):SFN 2515962 FRA-315-12.20L - Wilson Run 81748~|~1~|~4~|~04/IMS~|~IM funding for bridge replacement without capacity (not BR eligible):SFN 2510839 FRA-315-12.15 81748~|~1~|~1~|~01/NHS~|~NHS funded pvmt workMainline SR-315 work. I-270 CD ramp work due to adding capacity, retaining wall #14 107599~|~1~|~1~|~01/STR~|~Bridge 7203098 plan split 116858~|~1~|~1~|~01/NHS~|~Drainage improvements. 122497~|~1~|~1~|~01/BRF~|~Structure replacement. 119344~|~1~|~1~|~01/STR~|~Resurfacing. 124124~|~1~|~1~|~01/S5K~|~Resurfacing and related work. 124124~|~1~|~2~|~02/S5K/ZANE~|~Resurfacing and related work. 111314~|~1~|~1~|~01/SAE~|~Guardrail project on various routes in Adams County.100% HSIP funding. 109144~|~1~|~1~|~01/NHS~|~Slide repair work funded by the Geologic Site Management (GSM)program. Funds needed over the GSM cap will be from the District Preservation Program budget. 109144~|~2~|~2~|~02/NHS~|~Adding fuel price adjustment 106199~|~1~|~1~|~01/NHS~|~D04 FY 2022 culvert repair/replacements. 106199~|~1~|~3~|~03/STR~|~D04 FY 2022 culvert repair/replacements. 106199~|~2~|~5~|~05/NHS~|~Replacing culverts. 106199~|~1~|~4~|~04/NFA/JEFF~|~Field paving of twin culverts on N Poplar St in the Village of Jefferson. 106199~|~2~|~7~|~07/NHS~|~Aqua Ohio water line stabilization during culvert replacement. 106199~|~2~|~6~|~06/STR~|~Replacing culverts. 106199~|~1~|~2~|~02/S5K~|~D04 FY 2022 culvert repair/replacements. 103789~|~1~|~1~|~01/SAF~|~Safety Plan Split 116630~|~1~|~1~|~01/STR~|~Reactive Paving. 113500~|~1~|~1~|~01/MPO~|~Install 8 ft. of sidewalk on both sides of Colerain Avenue. 115383~|~1~|~1~|~01/BRF~|~TBD 116573~|~1~|~1~|~01/NFP~|~Created for J&C involvement 123242~|~1~|~1~|~01/S5K~|~Resurfacing. 96375~|~1~|~1~|~01/S>2~|~Replace Bridge Deck SFN 1261258 94362~|~1~|~1~|~01/NHS~|~On US35, 1.20 miles west of SR327 junction, it is proposed to rebuild & stabilize the slope to stop the horizontal & vertical movement.80/20 split01/NHS/OT/State 116926~|~1~|~1~|~01/IMS~|~Deck Overlay 103259~|~1~|~1~|~01/IMS~|~District wide fast drying pavement markers. 103259~|~1~|~2~|~02/S>2~|~District wide fast drying pavement markers. 103259~|~1~|~3~|~03/S<2~|~District wide fast drying pavement markers. 103259~|~1~|~4~|~04/NHS~|~District wide fast drying pavement markers. 103259~|~1~|~5~|~05/STR~|~District wide fast drying pavement markers. 103259~|~1~|~6~|~06/NFP~|~District wide fast drying pavement markers. 89459~|~1~|~1~|~01/IMS~|~Plan Split for SFN 7803753 TRU IR 80 0357 and SFN 7803788 TRU IR 80 0401 99333~|~1~|~1~|~01/ENH~|~test 120365~|~1~|~1~|~01/NFA~|~NEVI RD2 71-B 121269~|~1~|~1~|~01/STR~|~Resurfacing. 121269~|~1~|~2~|~02/S5K~|~Resurfacing. 113718~|~1~|~2~|~02/SAF~|~Part 2 - Rectangular Rapid Flashing Beacons and pedestrian refuge islands on Cleveland Avenue 113718~|~1~|~1~|~01/SAF~|~Part1 - Reducing lane widths, installing raised medians, enhanced and mid-block crossings and lighting from Huy to Cooke in Columbus. 99600~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 111202~|~1~|~1~|~01/SAF~|~Various pedestrian improvements in North College Hill including curb bump-outs, RRFB?s, new signage and markings, and other pedestrian improvements. 122355~|~1~|~1~|~01/S>2~|~Urban Paving Eligible Scope: milling, resurfacing, striping 122355~|~1~|~2~|~02/S>2~|~Locally funded scope, such as full depth repair, curbs, ramps, walks, etc. 113527~|~1~|~1~|~01/MPO~|~TLCI eligible funding: multi modal/complete street items including sidewalks, ped heads, striping enhancements 91557~|~1~|~1~|~01/BRO~|~Replace existing boxbeam bridge (COL-170-0469, SFN 1504444) with a new bridge. The most feasible alternative in terms of structure type will need to be established in Part 1 of the design process. 89039~|~1~|~2~|~02/NFP~|~100% Local participation on work items that are not eligible for federal-aid. 89039~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid MPO STP funding 121162~|~1~|~1~|~01/STR~|~All work is within this split 110868~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - 80% Federal (4FP7) and 20% State (4PS7) - replacement of structure. 109344~|~1~|~1~|~01/NFP~|~Culvert work in Tar Hollow State Forest. 13603~|~1~|~2~|~02/BRO~|~Pay items that are 100% local participation. 13603~|~1~|~1~|~01/BRO~|~80/20 fed/local funding split for all work using federal BHF funds. 109298~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail 100793~|~1~|~2~|~02/S>2~|~Chip sealing of TRU US 62A from 0.00 to 0.36. 100793~|~1~|~1~|~01/STR~|~Chip sealing of the following routes: ATB SR 193 0.00 to 2.47, ATB SR 534 0.00 to 7.69 and 7.77 to 12.10, TRU SR 88 19.11 to 22.76 and TRU SR 88A 0.00 to 0.04. 124951~|~1~|~1~|~01/MPO~|~Plan split for OKI resurfacing pilot program eligible expenses 114523~|~1~|~1~|~01/S<2~|~Urban Paving plan split 100584~|~1~|~1~|~01/STR~|~Chip seal of HOL-514 75732~|~1~|~2~|~02/NHS~|~Bridge maintenance on 3 bridges within the project, mainly bridge sealing:Mainline US 35 over Jasper Road:Left: SLM 13.54, SFN 2900408Right: SLM 13.54, SFN 2900416Overhead bridge carrying Brickett Rd over US 35:SLM 14.45 SFN 2900432 75732~|~1~|~1~|~01/NHS~|~Rehabilitate a portion of US 35 in Greene Co.; From 0.02 miles east of US 68 to 0.05 miles west of N. Bickett Rd. 120547~|~1~|~1~|~01/STR~|~Interchange improvements along SR 149 at the I-70 Interchange 120547~|~2~|~2~|~02/STR~|~Interchange improvements along SR 149 at the I-70 Interchange 120547~|~3~|~3~|~03/IMS~|~Interchange improvement along I-70 to reconstruct and lengthen the I-70 bridges over SR 149, to allow for widening of SR 149 under the bridges, including incidental roadway work along I-70. 120547~|~4~|~4~|~04/STR~|~Relocation of Sanitary and Water Lines along SR 149 107417~|~1~|~1~|~01/ENH~|~Rehabilitation of Pullman Car with 95% federal/5% local funds. Federal funds are TAP (4B37). 105243~|~1~|~1~|~01/STR~|~Resurfacing 105243~|~1~|~2~|~02/STR~|~Minor bridge work 10' to 20' span, includes ADA curb ramp reconstruction and catch basin reconstruction. 121380~|~1~|~1~|~01/NFA~|~Perry County Engineer's FY2029 guardrail project funded by CEAO - 4HB7 @ 100% capped at $150,000. 111285~|~1~|~1~|~01/SAE/GCEO~|~Guernsey County Engineer's FY2024 pavement marking project funded by CEAO. 4HB7 - see cap comments. 111513~|~1~|~1~|~01/MPO~|~TMACOG funded items 92982~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Resurfacing with related work on: 1) Cos-SR 541-00.00 to 08.59; 2) Kno-SR 541-00.00 to 08.92; 3) Cos-SR 60-07.58 to 07.71 112259~|~1~|~1~|~01/STR~|~General split. Will add more descriptive splits once bridge locations are determined. 113208~|~1~|~1~|~01/IMS~|~Construct new noise wall along IR-77 between Waterloo Road and Lovers Lane in the City of Akron. 123869~|~1~|~1~|~01/S>2~|~Intersection Improvement 116797~|~1~|~1~|~01/NHS~|~Resurfacing plan split 94548~|~1~|~1~|~01/NFP~|~Guardrail repair and replacement througout six counties. 114825~|~1~|~1~|~01/NHS~|~NHS plan split for PIC-762-11.18-14.89 86940~|~1~|~1~|~01/STR~|~Plan Split for TRU SR 87 13.42 to 22.36 123671~|~1~|~1~|~01/NHS~|~Deck Replacement. 108457~|~1~|~1~|~01/ENH~|~Main Plan Split 111123~|~1~|~1~|~01/BRO~|~Bridge Replacement of SFN 855205 116410~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 115821~|~1~|~1~|~01/SAF~|~Safety project. 123568~|~1~|~1~|~01/SAE~|~Placing R-W/R striping. Routes TBD 114600~|~1~|~1~|~01/STR~|~Overlay on HIG 506. 110387~|~1~|~1~|~01/STR~|~Ac Overlay without repairs 110387~|~1~|~2~|~02/S<2~|~AC overlay without repairs 107822~|~1~|~1~|~01/NHS~|~All work on US 42. 107822~|~1~|~2~|~02/STR~|~All work on CR 1 & CR 22 25189~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No CAP - Cos-SR 93-12.67 to the 26.72 - Treatment consiists of 10% Surface Repair; 1-1/2" mill; 3" overlay 106272~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-40-13.50-15.71 102209~|~1~|~1~|~01/NFA~|~LAW CR 6 7.74 ER Slide Project. 101454~|~1~|~1~|~01/STR/MILL~|~DSR# HOL-006 94300~|~1~|~1~|~01/CMQ~|~14 signalized intersections along US-22/SR-3, Cooper Road, and Main Street, within the City of Montgomery corp. limits. 91740~|~1~|~1~|~01/NFP~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 26 17.91-21.65 and MOE 260 5.52-11.32. Non federal aid route, funded 100% State. 91740~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 260 4.33-5.52 and NOB 285 5.36-14.47. 96409~|~1~|~1~|~01/NFA~|~Install new and upgrade existing guardrail on various routes and sections in Noble County. Funded 100% federal. 106746~|~1~|~1~|~01/MPO~|~Work to widen the paved shoulder to improve the Amish buggy travel that qualifies for federal-aid. 109581~|~1~|~1~|~01/SAF~|~Work at the intersection of SR 317 and Lockbourne Rd 106236~|~1~|~1~|~01/IMS~|~Repair sink hole and undermining of soils on IR 75 in Auglaize County. 93202~|~1~|~1~|~01/STR~|~General system paving of UNI-739: 6.06-14.13 113118~|~1~|~1~|~01/NFP~|~The Medina County Port Authority will administer the construction of a 1,500-foot extension of Commerce Parkway to assist the Infinium Wall Systems Project. 98643~|~1~|~1~|~01/BRO~|~SFN 0600067, AUG-29-0402 over Miami & Erie Canal - Remove deficient concrete filled arch structure. Investigate possible use of twin conspan replacement. 91826~|~1~|~1~|~01/IMS~|~Plane and Pave a portion of IR 71 in Hamilton County from SR 562 to SR 126. Highway signs will be included with this project. 91826~|~1~|~3~|~03/SAF~|~This work will consist of widening northbound IR-71 from the existing northbound exit to Ridge Road to the northbound exit from IR-71 to Red Bank Road. As part of this widening, the northbound entrance ramp from Kentucky will be reconstructed to pass between the pier and abumtnet of the Kentucky overpass over IR-71. A large retaining wall is anticipated as part of this work along northbound IR-71 from north of Kennedy to the exit ramp to Red Bank. Wrong way signage. 91826~|~1~|~2~|~02/IMS~|~Includes work on the following bridges: HAM-71-0875/SFN3115283, HAM-71-0970L/3115313, HAM-71-0970R/3115321, HAM-71-0991/3115364, HAM-71-0992/3115372, HAM-71-1068LR/3106888/3106896, HAM-71-1181L/3106969, HAM-71-1181R/3106977, HAM-71-1277L/3107027, HAM-71-1277R/3107051 113152~|~1~|~1~|~01/BRF~|~Replace structure > 20' span. 115604~|~1~|~1~|~01/STR~|~Construct a center turn lane and improve 2,200 linear feet of SR 60 to support an industrial park. 94395~|~1~|~1~|~01/STR~|~General System Resurfacing 122966~|~1~|~1~|~01/MPO~|~Plan Split 1 for HAM Plum St. project. 55/45 ODOT/Local (SAC 4TA7/LNTP) 87190~|~1~|~2~|~02/S<2~|~This split is for the portion of the project that is inside the Lima Urbanized Area. Although, the section is inside the Urbanized Area it is outside of the City of Lima. Therefore, there are no local funds in this event. The split cover SR 117 from 10.77 to 12.73. 87190~|~1~|~1~|~01/STR~|~This split is for the portion of the project outside the Lima Urbanized Area which is SR 117 from 3.25 to 10.77. 116751~|~1~|~1~|~01/STR~|~Resurfacing. 95974~|~1~|~1~|~01/NFP~|~Demolish salt dome and build new 3000 ton cap salt building. 112473~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Plan Split 1 117815~|~1~|~1~|~01/STR~|~Culvert replacement 93026~|~1~|~1~|~01/NHS~|~LUC-US20 (Reynolds Rd) island improvements... 102149~|~1~|~1~|~01/STR~|~SCI SR 73 19.63-21.01 102149~|~1~|~2~|~02/S<2~|~SCI SR 73 21.01-24.84 102149~|~1~|~3~|~03/S<2~|~Replace Joints. 102149~|~1~|~4~|~04/SAF~|~SCI 73 6.38-20.71 Low-cost safety improvements on two curves including surface treatment, signing and rumble stripes. 91712~|~1~|~1~|~01/BRO~|~Bridge deck replacement. HOC 180 00.42 (SFN 3702707). Includes substructure work. BR eligible, funded 80 federal/ 20 state. 114126~|~1~|~1~|~01/STR~|~Culvert replacement at HOL-3-0.72 122421~|~1~|~1~|~01/MPO~|~Plan split for path construction. 92706~|~1~|~1~|~01/MPO~|~Resurfacing CR 605 4.53 - 5.58 122384~|~1~|~1~|~01/S>2~|~Improvements to the intersection at Mastick Road and Puritas Ave. with pedestrian countdown timers, and signage 119585~|~1~|~1~|~01/NHS~|~Construct roundabout at SR 241 and Shuffel St. 119585~|~1~|~2~|~02/NHS~|~Pavement reconstruction, bridge replacement 10' to 20' span, includes culvert replacements and drainage work. 119585~|~1~|~3~|~03/NHS~|~Resurfacing slm 17.43-17.94 119585~|~2~|~4~|~04/NHS~|~Resurfacing 14.65-16.86 119585~|~2~|~5~|~05/NHS~|~Bridge preventive maintenance structures 10' to 20' span. 96131~|~1~|~1~|~01/NFA~|~Construct a new equipment storage building at a new Montgomery County Outpost Facility. 123688~|~1~|~1~|~01/NFA~|~Adena Road is not on the federal aid system. 101417~|~1~|~6~|~06/STR~|~Minor bridge work > 20' span. 101417~|~1~|~7~|~07/NHS~|~Minor bridge work > 20' span. 101417~|~1~|~1~|~01/S>2~|~Resurfacing, utilizing major rehab funds. 101417~|~1~|~3~|~03/STR~|~Resurfacing. 101417~|~1~|~4~|~04/NHS~|~Resurfacing. 101417~|~1~|~5~|~05/NHS/CANF~|~Resurfacing, urban paving in the City of Canal Fulton. 101417~|~1~|~2~|~02/S>2/MASS~|~Resurfacing, urban paving City of Massillon. 101417~|~1~|~8~|~08/NHS/CANF~|~Full and partial depth pavement repairs, includes installing ADA curb ramps in Canal Fulton. 101417~|~1~|~9~|~09/S>2/MASS~|~Full and partial pavement repairs, install ADA curb ramps in the City of Massillon. 101417~|~1~|~10~|~10/NFA~|~Retroactive fuel price adjustment 93990~|~1~|~1~|~01/BRF~|~Replace SFN 3937003 on TR 114 (Ridge Road) over the East Branch of the Huron River 107882~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 550 14.95-14.99. 100% Federal ER funds before 08/12/2018. 106288~|~1~|~1~|~01/STR~|~Resurfacing on county road 106288~|~1~|~2~|~02/S<2~|~Urban Portion of Project 100239~|~1~|~1~|~01/NFP~|~Chip seal MAH SR 165 from 1.65 to 5.46, SR 534 from 0.00 to 4.48, POR SR 225 from 10.74 to 15.76. 88677~|~1~|~2~|~02/S>2~|~Minor rehab of the pavement on US 50 from Tusculum Ave. to the ramp to Eastern Ave. This Planning Split is for the Urban portion of the project. This portion is between SLM 27.64 to 28.47 88677~|~1~|~1~|~01/NHS~|~Minor rehab of the pavement on US 50 from Tusculum Ave. to the ramp to Eastern Ave. This Planning Split is for the NHS portion of the project. This portion is between SLM 26.16 to 27.64 114782~|~1~|~1~|~01/IMS~|~Project to Paint bridges GRE-675-0059 that carries Feedwire Rd over I-675 and Bridges GRE-675-0512L/R that carrie I-675 over Patterson Rd. 117283~|~1~|~1~|~01/S>2~|~Resurfacing project in Ironton. 114696~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 114411~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various county roads. 91668~|~1~|~1~|~01/MPO~|~Various sections of the LMR Scenic Trail, Xenia-Jamestown Connector, Creekside Trail, and Wright Brothers Huffman Prarie Bikeway Proposed improvements include: addition of 2" of asphalt over the existing surface, installation of a 3' topsoil berm against new pavement with seed, fertilizer, and mulch, and application of thermoplastic pavement markings with silica sand for skid resistance on sections of the LMR Scenic Trail, and correction of a 100' section of uneven pavement on the Creekside Trail between Hawkins Road and the James Ranch Spur, correction of an uneven section of path on the LMR Scenic Trail between Hedges Run and the Glady Run Spur, filling of pavement cracks on all paths, and sealcoating of all asphalt sectios of paths with an approved agricultural bio-based road treatment product. 81723~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on JEF-7-26.49 to 31.04; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, pavement marking. 113028~|~1~|~2~|~02/S>2/MASS~|~Resurfacing, urban paving in the City of Massillon. 113028~|~1~|~1~|~01/NHS/MASS~|~Resurfacing, urban paving in Massillon. 113028~|~1~|~6~|~06/NHS~|~Bridge preventive maintenance. 113028~|~1~|~7~|~07/S>2~|~Bridge preventive maintenance. 113028~|~1~|~5~|~05/S>2~|~Resurfacing. 113028~|~1~|~4~|~04/NHS~|~Resurfacing. 113028~|~1~|~3~|~03/NHS/MASS~|~Full and partial depth repairs and ADA curb ramps in the City of Massillon. 97765~|~1~|~4~|~04/BRF~|~Bridge replacement project. ATH TR129T 3.32 (SFN 0545538). Funded through the OBPP. 97765~|~1~|~1~|~01/BRF~|~Bridge replacement project. ATH CR17C 0.12 (SFN 0550108). Funded throught the OBPP. 97765~|~1~|~2~|~02/BRF~|~Bridge replacement project. ATH CR48C 1.15 (SFN 0537837). Funded through the OBPP. 97765~|~1~|~3~|~03/BRF~|~Bridge replacement project. ATH CR90C 4.05 (SFN 0546429). Funded through the OBPP. 109991~|~1~|~1~|~01/IMS~|~Heat straightening beams underneath linked structure > 20' span. 112929~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-71-17.97-25.62 100853~|~1~|~1~|~01/STR~|~AC overlay with repairs on DAR SR 121 SLM 0.00 to 4.74. 100853~|~2~|~3~|~03/S<2~|~Resurfacing a portion of SR 121 & SR 320 in Preble County. Work includes pavement repair, planning and new asphalt overlay and all necessary traffic control.PRE-121 0.57 - 0.69PRE-320 1.66 - 3.12 100853~|~2~|~4~|~04/STR~|~Bridge rehab on rural bridges. 100853~|~2~|~5~|~05/S<2~|~Bridge rehab on small urban bridges. 100853~|~2~|~2~|~02/STR~|~Resurfacing a portion of SR 121 & SR 320 in Preble County. Work includes pavement repair, planning, new asphalt overlay and all necessary traffic control items.PRE-121 0.00 - 0.57PRE-121 1.96 - 5.97PRE-320 0.00 - 1.66Asphalt overlay on SFNs 6801846 and 6801781. 122218~|~1~|~1~|~01/STR~|~Conduit replacement. 107952~|~1~|~1~|~01/STR~|~SEN-224 from SLM 0.00 to 10.255 107952~|~1~|~2~|~02/S5K~|~SEN-224 from SLM 10.255 to 10.645 115921~|~1~|~1~|~01/BRF~|~All work in this bridge rehabilitation project. 95% federal funds through the Municipal Bridge Program. The non-federal match and all funds needed after the cap is reached will be provided by the City of Lima. 107695~|~1~|~2~|~02/NHS~|~Resurfacing a portion of SR 4 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all necessary traffic control items. 107695~|~1~|~3~|~03/NHS~|~Plan split for the replacement of the BUT-2-1488R bridge. 107695~|~1~|~1~|~01/NHS~|~Bridge maintenance on bridges BUT-4-1480L & BUT-4-1480R. 111340~|~1~|~1~|~01/IMS~|~Rebuild lighting system and patching on retaining walls 111340~|~1~|~2~|~02/SAF~|~Repair damage from vehicle accidents 105153~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding -4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of two structures on PER SR 37 at 16.95 (SFN 6401083) and 19.35 (SFN 6401172). 102638~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 374 0.00-3.72. Rural federal aid funded 80 federal/20 state. 124701~|~1~|~1~|~01/BRO~|~Bridge rehabilitation. 96835~|~1~|~1~|~01/NFP~|~Work to replace the bridge. 80% state funds SAC 4C87 and 20% local funds for the construction phase. The County Engineers Association of Ohio (CEAO) and ODOT approved the project to be part of the Federal/State Exchange Program. The 20% non-federal match is provided by the Putnam County Engineer. 105461~|~1~|~1~|~01/NFP~|~Non federal aid 105461~|~1~|~2~|~02/STR~|~STP Rural - SR 47 109520~|~2~|~3~|~03/NHS~|~Intersection improvement at SR 82 and Howland-Wilson Rd. 109520~|~3~|~4~|~04/S>2~|~Intersection improvement at TRU SR 46/Howland-Springs Rd. 109520~|~1~|~2~|~02/S>2/TCSE~|~Waterline relocation along SR 46 paid by the Trumbull County Sanitary Engineer. NOTE: Waterline work along E Market St is included in the project cost and reimbursable to the owner or paid by ODOT. 109520~|~1~|~1~|~01/S>2~|~Intersection improvement at SR 46 and E Market St, includes culvert work. 109520~|~4~|~5~|~05/ENH~|~Construct new sidewalks on the east side of SR 46. 87096~|~1~|~1~|~01/STR~|~Plan split for resurfacing the Rural portion of WAR SR 123 between Morrow and the Montgomery County Line. The Rural Portions are from SLM 9.62-16.08, from 20.84-22.45, and from 23.54-23.95 87096~|~1~|~2~|~02/S<2~|~Plan split for resurfacing the STP<200000 portion of WAR SR 123 between Morrow and the Montgomery County Line. The STP<200000 Portions are from SLM 22.45-23.54, SLM 24.59-27.54, SLM 31.25-31.41, and SLM 32.09-33.61 87096~|~1~|~3~|~03/S>2~|~Plan split for resurfacing the STP>200000 portion of WAR SR 123 between Morrow and the Montgomery County Line. The STP>200000 Portions are from SLM 9.45-9.62, SLM 16.08-17.23, and SLM 20.67-20.84 87096~|~1~|~4~|~04/S<2~|~Rehab on small urban bridge. 107508~|~1~|~1~|~01/NHS~|~STW Freight Detection Upgrade. 107966~|~1~|~1~|~01/STR~|~Federally eligible resurfacing items. 107966~|~1~|~2~|~02/S>2~|~For work performed within the Wooster Urban Area 115566~|~1~|~1~|~01/MPO~|~MORPC STBG - Grade Separation 115566~|~1~|~2~|~02/S>2~|~ORDC Share of Grade Crossing Elimination Project 103526~|~1~|~1~|~01/NHS~|~FY2020 Urban Paving for the City of Oxford on US50 within the City of Oxford. The limits are SLM 15.25 - 16.29 - US27 within the City. This Plan Split is for the items paid at 80% ODOT and20% City mainly consists of planing, new asphalt overlay and final striping. 103526~|~1~|~2~|~02/NHS~|~FY2020 Urban Paving for the City of Oxford on US27 within the City of Oxford. The limits are SLM 15.25 - 16.19 - US 27. This Plan Split is for the items paid at 100% City mainly consists of pavement repair. MOT striping, utility work, curb & gutter and curb ramps. 103526~|~1~|~3~|~03/NHS~|~Pedestrian improvement on High Street from Patterson Avenue to South Campus Avenue in Oxford. Improvements include: convert center-turn lane to a raised landscape median with pedestrian refuge island and marked crosswalk: reduce the number of crosswalks along the corridor; install illuminated pedestrian signage; and install highly visible crosswalks. 103526~|~1~|~4~|~04/NHS~|~Split for non project eligible improvements associated with the Part 2 work (pedestrian improvements on US 27 on Miami University's campus). 101415~|~1~|~1~|~01/STR~|~DSR# BEL-017 123587~|~1~|~1~|~01/S>2~|~conduits linked 123587~|~1~|~2~|~02/STR~|~conduit linked 123587~|~1~|~3~|~03/NHS~|~GRE-35-0044 conduit linked 105890~|~1~|~1~|~01/NHS~|~Repair bridge damage caused by accident on bridge JEF-22-1632 (SFN 4101960) 95420~|~1~|~1~|~01/ENH~|~This project consists of the installation of a bike path from the Great Miami River Corridor Bikeway to Valley Street (CR 525). 113672~|~1~|~1~|~01/CMQ~|~Re-construction of 7 traffic signals on SR 7 in Steubenville; includes ped heads, camera activation, etc. 100% State 4PS7 funds up to $50,000, and 80% Federal 4TA7 and 4TB7 funds up to their respective CAPs. 112158~|~1~|~1~|~01/SAF~|~Replace existing traffic signal and add radar extend detection and back-plates, provide pedestrian signals and curb ramps, the southbound left turn lane approximately 100? 101073~|~1~|~1~|~01/IMS~|~RPMs 95901~|~1~|~1~|~01/NFP~|~Type B emergency project for full depth pavement repair along MOE 255 0.00-18.08/Various. 100% state. 102094~|~1~|~1~|~01/NFA~|~The Village of Perrysville proposes to reconstruct First Street, Pottery Street and Bridge Street. 102887~|~1~|~1~|~01/S>2~|~AC Overlay with repairs on:HAM-22 SLM 10.21 to 10.48HAM-22 SLM 10.48 to 11.07HAM-22 SLM 11.07 to 11.94 109658~|~1~|~1~|~01/STR~|~Resurfacing COL-172 104867~|~1~|~1~|~01/IMS~|~Replace deck on structure MAD-29-10.61 over IR 70 106695~|~1~|~1~|~01/NFP~|~ODNR funded project at Zaleski State Forest and Headquarters - pave and stripe parking lot and Hope Schoolhouse parking lot, repair/replace culverts and bridges. Funded 100% state ODNR. 88764~|~1~|~4~|~04/S<2~|~ResurfacingSTP Urbanized Area (Norwalk) HUR-547-7.13 - 8.18 80/20 Fed/State 88764~|~1~|~1~|~01/NHS~|~ResurfacingUrbanized Area (Sandusky)ERI-006-11.25 - 15.5580/20 Fed/State 88764~|~1~|~2~|~02/NHS~|~Bridge WorkUrbanized Area (Sandusky)ERI-6-12.40 (SFN 2201674)ERI-6-14.98 (SFN 2201739)80/20 Fed/State 88764~|~1~|~3~|~03/S<2~|~Bridge WorkUrbanized Area (Norwalk)HUR-547-7.25 (SFN 3904326)80/20 Fed/State 96784~|~1~|~1~|~01/STR~|~General System Resurfacing including pavement repairs and pavement markings on SR 800 from SLM 15.89 to SLM 25.04. 81425~|~1~|~1~|~01/SAF~|~Widen SR-125 to add a right turn lane westbound at mt. carmel road and to provide a third westbound through lane from just west of the IR275 southbound exit ramp to Independence. Widen Mt. Carmel to provide southbound dual left turn lanes. Widen SR-125 to provide a third eastbound through lane from just east of the IR275 northbound exit ramp to approximately 1300' east of Nine Mile Road. 81425~|~2~|~2~|~02/NFP~|~Clermont County Water & Sewer items of work in the SR125 project from 0.40 miles east of the Hamilton county line to 1.15 miles east of the Hamilton county line 89018~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) 6003605 MUS IR70 23.82 Intersect: 70 Under C107 Sundale Rd; BR Eligible for Rehabilitation: Length=280 SD/FO(2) SR=78.5 DSR=7; 101894~|~1~|~1~|~01/BRF~|~Bridge replacement. 123286~|~1~|~1~|~01/SAF/HAS~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%. 99700~|~1~|~1~|~01/STR~|~Split for resurfacing work funded at 80% federal and 20% state 99700~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 96167~|~1~|~1~|~01/NFA~|~Various locations in the City of Rossford. 110619~|~1~|~1~|~01/NHS~|~NHS Plan Split: DEL-23-10.63-10.81 110619~|~1~|~2~|~02/S<2~|~City of Delaware Urban Paving Plan Split: DEL-23-10.15-10.81 118704~|~1~|~1~|~01/NHS~|~Rockfall hazard remediation. MEG 33 4.45, 6.30-6.45. 114636~|~1~|~1~|~01/NFA~|~Created for J&C involvement 98897~|~1~|~1~|~01/IMS~|~Guardrail repair. 94602~|~1~|~2~|~02/SAE~|~This Plan Split is the for Systematic replacement of the Type A Anchor Assemblies. This is for the specific locations in the plans on BUT-4, BUT-27, BUT-42, CLE-32, CLE-52, GRE-444, HAM-32, HAM-125, HAM-22, HAM-27, HAM-50, HAM-52, and HAM-127 94602~|~1~|~1~|~01/NHS~|~District wide guardrail repair. This plan split is for the general guardrail replacement/upgrade on the as needed basis. 88778~|~1~|~1~|~01/STR~|~Chip Sealing Multiple Routes 88778~|~1~|~2~|~02/S<2~|~Chip Seal portion of roadway in Crestline urbanized area 123518~|~1~|~1~|~01/STR~|~Landslide repair. 111398~|~1~|~1~|~01/STR~|~Replace culverts on BUT-122 and BUT-177 122208~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-C 112481~|~1~|~1~|~01/S>2~|~AC overlay without repairs 114706~|~1~|~1~|~01/STR~|~Overlay on BRO 62. 102361~|~1~|~1~|~01/STR~|~Microsurfacing of MAH US 224 from 0.00 to 2.88, MAH SR 7 from 0.00 to 3.15, MAH SR 534 from 8.49 to 13.78. 118619~|~1~|~1~|~01/STR~|~All of the work from SLM 17.689 to SLM 22.075 that is outside of the corporation limits of Delphos. 118619~|~2~|~2~|~02/S5K~|~All work within Delphos from SLM 22.075 to SLM 22.611. 88720~|~1~|~1~|~01/BRO~|~Brdg Deck ReplacementOn SR247, 0.62 mile south of the Hillsboro corporation limits, it is proposed to replace the bridge deck on SFN 3603660 11.07 Intersect: Rocky Fork Creek. 80 Fed/20 State. 01/BRO/BR/State 122363~|~1~|~1~|~01/MPO~|~Plan split for eligible road rehabilitation & resurfacing work. 122363~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% Local cost. 88483~|~1~|~2~|~02/SAF/GAH~|~Non eligilbe removal and replacement of asbestos water line under Heil Rd sidewalk - 100% Gahanna funding 88483~|~1~|~1~|~01/SAF~|~SRTS funding for sidewalks, bikepaths, bike lane, bike racks, signals, school flasher, signing, pvmt markings 93253~|~1~|~2~|~02/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on SFN 4502671 - LIC US 62 11.04; SFN 4502701 - LIC US 62 13.00 93253~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge painting on 1) 6002404 MUS IR70 2.99 Intersect: I-70 Over Cr28 Hopewel Rd; Not BR Eligible for Rehabilitation: Length=139 SD/FO(0) SR=90.3 DSR=7; 2) 6002439 MUS IR70 2.99 Intersect: I-70 Over Cr28 Hopewel Rd; Not BR Eligible for Rehabilitation: Length=120 SD/FO(0) SR=8.3 DSR=7; 93253~|~1~|~3~|~03/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on 6004415 MUS SR93 31.42 Intersect: Over Br White Eyes Creek; Not BR Eligible for Rehabilitation: Length=18 SD/FO(0) SR=71.8 DSR=7; 101526~|~1~|~1~|~01/STR~|~DSR# COL-007 101526~|~1~|~2~|~02/STR~|~Culvert to be replaced with slope repair project. 105433~|~1~|~1~|~01/STR~|~Plan Split for bridge DEL-521-10.32 & DEL-521-12.75 105433~|~1~|~2~|~02/STR~|~Roadway work and ancillary items associated with the four bridges. Bridge work - DEL-521-11.38 and DEL-521-11.98 99451~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% State funds from the District Preservation Program budget SAC 4PS7. 109054~|~1~|~1~|~01/IMS~|~Guardrail for Interstates. 109054~|~1~|~2~|~02/NHS~|~Guardrail on NHS System. 121515~|~1~|~1~|~01/SAF~|~Guardrail replacement & adjustment 90757~|~1~|~2~|~02/S>2~|~LUC-CR22-16.74 to 17.01; this is for the piece between Monroe St and I-75/Glenwood. No TMACOG funds on this piece. 90757~|~1~|~1~|~01/MPO~|~LUC CR22 17.02-17.52 Bancroft St reconstruct..From I-75/Glenwood to Ashland. 122464~|~1~|~2~|~02/S5K~|~TAP funded plan split for sidewalk/pedestrian related work. 122464~|~1~|~1~|~01/S5K~|~Reconstruction work included in this split funded by small cities funding. 102713~|~1~|~1~|~01/NHS~|~This plan split is for mill and fill on NHS route. 102713~|~1~|~2~|~02/SAF~|~Signal work 102713~|~1~|~3~|~03/NHS~|~Local funded pavement repair. 102713~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 89048~|~1~|~1~|~01/CMQ~|~80/20 fed/local funding split using NOACA CMAQ funds. 105776~|~1~|~1~|~01/NFP~|~Plan split for mowing 117086~|~1~|~1~|~01/NFA~|~D09 HS FY2025 107919~|~1~|~1~|~01/S<2~|~On SR 163 from SLM 27.20 to SLM 30.12 114303~|~1~|~1~|~01/NHS~|~Slide repair. 98509~|~1~|~6~|~06/S>2~|~See linked structures > 20' span. 98509~|~1~|~3~|~03/S>2/HUBB~|~Resurfacing TRU SR 304 from 7.09 to 8.74 in the City of Hubbard. 98509~|~1~|~4~|~04/STR/HUBB~|~Resurfacing TRU SR 304 from 8.74 to 8.89 in the City of Hubbard. 98509~|~1~|~5~|~05/STR~|~Resurfacing TRU SR 303 from 0.00 to 1.28 and TRU SR 304 from 8.89 to 9.95. 98509~|~1~|~2~|~02/S>2~|~Resurfacing TRU SR 45 from 10.66 to 11.65 and TRU SR 169 from 6.42 to 6.76. 98509~|~1~|~1~|~01/S>2/NILE~|~Resurfacing TRU SR 169 from 5.65 to 6.42 in the City of Niles. 98509~|~1~|~7~|~07/SAE~|~Adding Rumble Stripes. 98509~|~1~|~8~|~08/S>2/HUBB~|~100% City of Hubbard items. 88290~|~1~|~1~|~01/SAE~|~Plan split for all work eligible for 100% federal participation from SRTS and OH393. 119477~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing CEAO LBR Federal Funds at 80/20. 122339~|~1~|~1~|~01/NFP~|~Minor culvert work. 101192~|~1~|~2~|~02/NHS~|~Replace traffic signal at US 23/Tarlton Rd 101192~|~1~|~1~|~01/NHS~|~Pavment overlay from 0.00 to 5.21 121543~|~1~|~1~|~01/IMS~|~Drainage Block PID. 92110~|~1~|~1~|~01/SAE~|~SRTS Project (Sidewalks) 92110~|~2~|~2~|~02/SAE~|~Added Plan Split for 100% Local Items 94675~|~1~|~1~|~01/STR~|~Superstructure replacement. 107217~|~1~|~1~|~01/NHS~|~replace the existing US 35/Valley Trebein intersection with an interchange of Valley Trebein over US 35. 107217~|~1~|~2~|~02/NHS~|~This plan split covers all work associated with constructing two new bridges for the project. 107217~|~1~|~3~|~03/NHS~|~This plan split covers all bridge work related to rehabilitation. 114231~|~1~|~1~|~01/SAF~|~Stripe new crosswalks in Lewisburg on SR-503 105248~|~1~|~1~|~01/NHS~|~Resurfacing of SR 7 from SLM 0.37 to 3.48 100922~|~1~|~1~|~01/STR~|~Thin AC overlay on rural routes: CHP SR 29 SLM 27.15 to 30.06 & CHP SR 235 SLM 6.59 to 9.58. 102858~|~1~|~1~|~01/IMS~|~Deck replacements > 20' span. 102858~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 107760~|~1~|~1~|~01/SAF~|~Turn lanes, pedestrian improvements and RR signal pre-emption at Sycamore Street in Columbus Grove. Safety program funds will be used first and District Preservation Program funds. 107760~|~1~|~2~|~02/STR~|~Railroad related work funded by ORDC. Work includes a traffic signal, blank out signs, pavement markings, sidewalk, and curbing in and around the intersection of SR 65 and Sycamore Street. 107984~|~1~|~1~|~01/NFP~|~Guardrail Maintenence 118615~|~1~|~1~|~01/NHS~|~added plan split. 91623~|~1~|~1~|~01/IMS~|~Spot paving on various Interstate routes in FAY, FRA, MAD, & PIC Counties 86846~|~1~|~1~|~01/SAF~|~A safety funded project to widen HEN SR108 16.09-16.62 98534~|~1~|~1~|~01/NFP~|~All work is in this split. 100% state funds from the District Preservation Program budget. SAC 4PS7. 87128~|~1~|~1~|~01/BRO~|~Rehabilitate bridge WAR-48-0896 by replacing the concrete deck and painting the structural steel. SFN: 8301115 and Intersect: Turtle Creek 100544~|~1~|~2~|~02/NFA~|~Project to place 1.25 " overlay on various routes in Champaign County classified as Non Federal Aid Routes. 100544~|~1~|~1~|~01/STR~|~Project to place 1.25" overlay on various rural routes in Champaign Count. 107240~|~1~|~1~|~01/SAF~|~FRA Refugee Rd at Winchester Pike. Signal modifications, pavement markings, pedestrian improvements, access management 107687~|~1~|~1~|~01/STR~|~Resurfacing on SR 65 outside of the Lima Urban Area using district preservation funds (80% 4PF7 and 20% 4PS7). 94328~|~1~|~1~|~01/S5K~|~Resurfacing along MUS-93 94328~|~1~|~2~|~02/STR~|~Resurfacing along rural classified roadway segments. 112119~|~1~|~1~|~01/NHS~|~Ditch clean out and repair 113031~|~1~|~3~|~03/S>2/GREE~|~Resurfacing, urban paving in the City of Green. 113031~|~1~|~8~|~08/IMS~|~Bridge preventive maintenance. 113031~|~1~|~10~|~10/S>2~|~Bridge preventive maintenance. 113031~|~1~|~7~|~07/S>2/NFRA~|~Resurfacing, urban paving in the City of New Franklin. 113031~|~1~|~1~|~01/NHS~|~Resurfacing. 113031~|~1~|~2~|~02/S>2~|~Resurfacing. 113031~|~1~|~5~|~05/NHS/NFRA~|~Resurfacing, urban paving. 113031~|~1~|~9~|~09/NHS~|~Bridge preventive maintenance. 113031~|~1~|~4~|~04/S>2/GREE~|~Full and partial depth repairs. 113031~|~1~|~6~|~06/NHS/NFRA~|~Full and partial depth pavement repairs. 124266~|~1~|~1~|~01/S>2~|~Construct pedestrian facility 124319~|~1~|~1~|~01/NHS~|~Federal items 101404~|~1~|~1~|~01/S<2~|~Plan Split for the 80/20 items on SR 732 between SLM 15.49-16.48 - US 35 SLM 10.02 - 12.42 101404~|~1~|~2~|~02/S<2~|~Plan Split for the 100% City items on SR 732 between SLM 15.49-16.48 - US 35 SLM 10.02 - 12.42 95562~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on TUS-36; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, and pavement marking. 107901~|~1~|~1~|~01/NHS~|~Priority System NHS Plan Split: DEL-23-10.63-10.81 96284~|~1~|~1~|~01/NFP~|~Plan split for facility renovation 95688~|~1~|~1~|~01/MPO~|~3 traffic signals on SR-65 124469~|~1~|~1~|~01/SAF~|~Install sidewalks 99942~|~1~|~1~|~01/STR~|~Culvert Replacement 96465~|~1~|~2~|~02/NHS/CIRC~|~100% city funding for sanitary and water lines and unwarranted signal at S Court St/new connector 96465~|~1~|~1~|~01/NHS~|~Small City/Local funding to construct S Court St Connector, relocate Pickaway Crossing and Goodchild Rd and work on US 23 and S Court St 124998~|~1~|~1~|~01/NFP~|~All work included in this plan split. 96264~|~1~|~1~|~01/SAF~|~This split uses federal Safe Routes to School funding and uses Toll Revenue Credit to bring the federal percentage to 100%. 118147~|~1~|~1~|~01/STR~|~Landslide repairs. 118147~|~1~|~2~|~02/STR~|~Water line relocation. 84575~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 377 0.00-1.47 and MRG 377 0.00-10.18. Funded 80 federal/20 state. 88827~|~1~|~1~|~01/NHS~|~Bridge Repair 98709~|~1~|~1~|~01/NFP~|~Project to install shotcrete on recently built retaining walls. 94701~|~1~|~1~|~01/STR~|~Culvert replacement/rehabilitation. Locations include: NOB 145 0.65, 2.48, 6.21, 7.20, 7.22; NOB 285 3.55; NOB 340 5.32, 5.41, 6.70, 6.74; NOB 513 10.22; NOB 821 12.71, 20.13, 20.24.Funded 80 federal/20 state. 94320~|~1~|~4~|~04/S<2~|~District Preservation Paving - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing using 60 AC Overlay w/repairs on OFAH-Urban segments 94320~|~1~|~5~|~05/S<2/CAMB~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local - No CAP - Resurfacing using 60 AC Overlay w/repairs on Urban Paving Segments 94320~|~1~|~3~|~03/NHS~|~District Preservation Paving - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing using 60 AC Overlay w/repairs on NHS segments 94320~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge Maintenance on NHS Bridge 94320~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge Maintenance on IMS structures 94320~|~1~|~6~|~06/NFA~|~retroactive fuel price adjustment 104087~|~1~|~1~|~01/NFA~|~plan split 76994~|~1~|~1~|~01/NHS~|~Rehabilitate two bridges by replacing superstructure on one bridge (JEF-7-1235, SFN 4100549) and repairing concrete slope on the other bridge (JEF-7-1185, SFN 4100484). 76994~|~1~|~2~|~02/NHS~|~Funding event created for on-going services to be provided by consultant during the construction phase for the rehabilitation of the bridges. 117476~|~1~|~1~|~01/ENH~|~Sidewalks, crosswalks, ADA curbs, and RRFBs 92906~|~1~|~1~|~01/IMS~|~8702977 WOO CR34 1 Intersect: Tr 34 Eagleville Road 8703000 WOO CR34 1 Intersect: Tr 34 Eagleville Road 8703035 WOO IR75 1.79 Intersect: Rocky Ford Creek8703094 WOO IR75 1.79 Intersect: Rocky Ford Creek 105357~|~1~|~1~|~01/NHS~|~Lighting Maintenance 105357~|~1~|~2~|~02/NHS~|~Installation of a 4 way flasher at ASD US 0224 06.80 & SR 0511. 122046~|~1~|~1~|~01/SAF~|~Roundabout 121694~|~1~|~1~|~01/SAF~|~Radar Detectors 107763~|~1~|~1~|~01/IMS~|~FRA IR 670 3.88 to 5.03 107763~|~1~|~2~|~02/BRO~|~Minor bridge work on 15 structures 95323~|~1~|~1~|~01/BRO~|~Deficient Bridge SFN 1958038 108015~|~1~|~1~|~01/STR~|~Split for Rural STP section 108015~|~1~|~2~|~02/NHS~|~Split for NHS section of pavement 122449~|~1~|~1~|~01/SAF~|~Swapping the bicycle lane and parking lane on North 4th Street from Warren Street north to E Hudson Street 122449~|~2~|~2~|~02/SAF~|~Part 2: East 5th Avenue from High St to North 5th St 116679~|~1~|~1~|~01/STR~|~All work is in this plan split. 109297~|~1~|~1~|~01/NFP~|~D09 HS FY20 106279~|~1~|~1~|~01/IMS~|~Systematic sign replacements on various routes throughout District 4. 124662~|~1~|~1~|~01/SAF~|~Plan Split for HSIP CEAO funding 102573~|~1~|~1~|~01/NHS~|~plan split 102573~|~1~|~2~|~02/NHS~|~WVDOH Share 104058~|~1~|~1~|~01/NHS~|~Rockfall remediation. 100446~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2021 93536~|~1~|~1~|~01/SAE~|~Sidewalks, pavement marking, and signing near the schools in Yellow Springs 84414~|~1~|~1~|~01/NHS~|~Concrete joint repair project. ATH 50 17.50-24.05. NHS route funded 80 federal/20 state. 103024~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span. 96979~|~1~|~1~|~01/NHS~|~Signal upgrade at SR 534 110497~|~1~|~1~|~01/STR~|~plan split for pavement work on the rural sections: WAR-350: SLM 4.31-7.9 105435~|~1~|~1~|~01/IMS~|~Pavement work to widen the IR 270 EB to IR 71 NB ramp and convert drop lane to add lane 105435~|~1~|~3~|~03/IMS~|~Replace deck on SFN 2511460 105435~|~1~|~2~|~02/IMS~|~Replace structures SFN 2511224 and 2511372. 86757~|~1~|~1~|~01/STR~|~Signals 114794~|~1~|~1~|~01/MPO~|~TLCI Intersection Improvement eligible work for the City of Mayfield Heights. 108884~|~1~|~1~|~01/NFP~|~Federal Exchange Bridge Split 96146~|~1~|~1~|~01/NFP~|~Construction of a full-service maintenance facility in Greene County. 88344~|~1~|~1~|~01/S<2~|~"01/<2/OT/CAMB - City of Cambrdige 123604~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction work items funded by NOACA STBG funds. 86320~|~1~|~2~|~02/S>2~|~Resurface under urban paving program on MOT SR 48 (South Main Street, Dayton) from River Park (SLM 11.24) to Patterson Blvd. (SLM 12.13) 86320~|~1~|~1~|~01/MPO~|~Widen South Main Street from 4 to 5 lanes including saphalt resurfacing, curb, sidewalks, street lights, traffic signals, storm sewer and retaining walls on South Main Street from River Park (SLM 11.24) to Patterson Blvd (SLM 12.13) in Dayton. 112034~|~1~|~1~|~01/NHS~|~All work to repair the slopes. Funds from the Geologic Site Management Program. After the GSM cap is reached funds will from the District Preservation Program Budget. 110570~|~1~|~3~|~03/S>2~|~Resurfacing on portions of US 50 110570~|~1~|~1~|~01/NHS~|~Replace bridge deck on SFN 3103870 110570~|~1~|~2~|~02/S>2~|~Bridge deck replacement for bridge SFN 3103811 119421~|~1~|~1~|~01/S50~|~Asphalt Concrete Overlay with Repairs ERI-101-2.72 to 7.62 119421~|~1~|~2~|~02/S5K~|~Partial and full depth repairs. 100% local. 101298~|~1~|~1~|~01/STR~|~ALl roadway work included on US 68 in Clinton County 103180~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation Pavement - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on Mus-IR 70-10.66 to 13.22 103180~|~1~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation Bridge - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Deck Sealing of Priority System bridges along IR 70 in Zanesville (Mus-IR 70 10.66 to 13.22) 100610~|~1~|~1~|~01/STR~|~Plan Split for the rural portion of SR 235 from SLM 0 - 5.16 100610~|~1~|~2~|~02/S>2~|~Plan Split for the Urban portion of SR 235 from SLM 5.16 - 6.13 100610~|~1~|~3~|~03/NHS~|~Plan Split for NHS portion of US 68 from SLM 11.34 - 20.46 100610~|~1~|~4~|~04/NHS~|~This plan split is for bridge work on this project. 103249~|~1~|~1~|~01/MPO~|~Resurface portion of the GMRRT 83312~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to construct roundabouts at WOO CR9 7.39-7.68/WOO TR68 0.46-0.74 107278~|~1~|~1~|~01/BRF~|~Fed eligible items for the bridge replacement 90902~|~1~|~1~|~01/STR~|~District Allocation 119801~|~1~|~1~|~01/MPO/CANT~|~Resurfacing. 113835~|~1~|~1~|~01/STR~|~Major rehabilitation of SR 39 120493~|~1~|~1~|~01/MPO/MASS~|~Construct a new roundabout. 80704~|~1~|~3~|~03/NHS~|~"03/NHS/BR/ " - TRAC Funded (80% 4BK7/20% 4BD7) - Partial CAP - $1,000,000.00 maximum of District Preservation 4PF7(80% Federal) / 4PS7 (20% State) - Construction of the new bridge carrying new roadway facility over SR 16 and removal of LIC-16-1771L (SFN 4500849). 80704~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - TRAC Funded Roadway 4BK7 (80% Federal) / 4BD7 (20% State) - No CAP - Work includes improvements to SR 16, interchange ramps, and new roadway between ramp termini. 80704~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - CMAQ Funding 4BK7/4TB7 (80% Federal) /4BD7/4BG7 (20% State/Local) - CAPs: LCATS: $2,971,300, Village of Granville: $250,000, City of Newark: $195,783.75.- Realignment of 1) Lic-CR 128-00.05 to 00.54; 2) Lic-CR 539-05.52 to 07.89; establishment of new roadway to service interchange facility. 80704~|~1~|~4~|~04/ENH/NEWA~|~"04/ENH/OT/NEWA" - Transportation Alternatives Program - 80% 4B37/20% Local - CAP = 1) ODOT TA Funds (4B37) $1,000,000.00; 2) Private Donations (4BG7) $28,700.00; 3) City of Newark Funds (4BG7) $104,216.25 - Construction of bike path, decorative railing, portion of bridge to accomodate multi-use path, and installation of roadway lighting. 113477~|~1~|~1~|~01/MPO~|~Roadway reconstruction consisting of replacing the entire roadway section from the base to the concrete surface, along with new curbs, sidewalks, pedestrian and roadway lighting, drainage facilities and decorative amenities enhancing and extending the entrance into downtown. 113477~|~1~|~2~|~02/S>2~|~Roadway reconstruction - NHS 83860~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7 (100% State) - Annual contract for placement of Poly Striping within District 5 on IR; US; and SR 116589~|~1~|~1~|~01/NHS~|~Resurfacing US-35 SLM 0.00-2.60 116589~|~1~|~2~|~02/STR~|~Resurfacing SR-435 SLM 0.00 to 0.96 107160~|~1~|~1~|~01/SAF~|~Reconstruct the traffic signal at the intersection of SR 48 and Whipp Road. 107160~|~1~|~2~|~02/SAF~|~Radius improvements to the SE corner to be paid 100% by the City of Centerville. 112843~|~1~|~1~|~01/STR~|~Resurfacing of MAH US 62 from 1.41 to 5.16. 112843~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span. 112843~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span. 89559~|~1~|~1~|~01/IMS~|~Spot paving and resurfacing on Interstate 75 SLM 0.00 to 8.88. From MIA/SHE County Line to Railroad Bridge at SLM 8.88. Miami from structure MIA 75 14.15 to MIA/SHE Cty Line SLM 19.96. 87123~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 7 14.03-17.60. NHS route funded 80 federal/20 state. 87123~|~1~|~2~|~02/SAF~|~Recessed wet reflective markings on WAS 7 14.03-17.60. 115419~|~1~|~1~|~01/NFP~|~Plan split for demolition work using State funds. 84507~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. ATH 144 0.00-4.57, ATH 329 12.19-13.66, and ATH 550 6.70-10.66, 12.13-14.63. Rural other federal aid route funded 80 federal/20 state. 84507~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment. ATH 682 6.14-7.75. Urban other federal aid funded 80 federal/20 state. 108030~|~1~|~1~|~01/NFP~|~Tree Cutting. 92151~|~1~|~1~|~01/BRO~|~Bridge replacement project. ATH 329 14.40, SFN 0503576. Funded 100% state. 119084~|~1~|~1~|~01/IMS~|~Resurfacing. 116640~|~1~|~1~|~01/NHS~|~NHS Plan split for resurfacing and resurfacing related items for PIC-23-5.21-12.92. 95369~|~1~|~1~|~01/NHS~|~Replacing structure 10' to 20' span. 116935~|~1~|~1~|~01/BRO~|~Emergency A Repair 80252~|~1~|~1~|~01/S>2~|~Change order for 2010 project 86292~|~1~|~1~|~01/BRO~|~Deck replaced & 1 or 2 beams replaced, BR eligible2517493 FRA IR270 3.76 Intersect: Cleveland Ave. Over I-270 86292~|~1~|~2~|~02/SAF~|~Safety funding for removal of 270 WB to Cleveland Ave NB slip ramp (Ramp D). D6 funding for other ramp improvements not funded with safety funding 86292~|~1~|~3~|~03/BRO~|~Change order for extra work due to utility delay. AT&T to reimburse ODOT 102159~|~1~|~1~|~01/S<2~|~Urban paving within City of IrontonLAW 93 0.69-1.37 & 1.62-1.82 102159~|~1~|~2~|~02/S<2~|~LAW 93 1.37-1.6280/20 Fed/State 110991~|~1~|~1~|~01/SAE~|~Improve the SR 32 and 8 Mile Rd intersection by installing a signalized Green T intersection and improving the profile grade on 8 Mile Rd 110991~|~1~|~2~|~02/S>2~|~Slide repair 98800~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. PRE-STCLR-0020 (SFN: 6860176) which carries W. St. Clair Street over a tributary to Seven Mile Creek in the City of Eaton. Bridge is listed on the National Register of Historic Places. Rehab work includes replacement of stringers, bearing plates, backwall plates, and pavers. 103487~|~1~|~1~|~01/IMS~|~Existing IR 70/71 pavement reconstruction 103487~|~1~|~2~|~02/NHS~|~IR 70/71 widened pavement and work on Fulton St and Mound St 103487~|~1~|~3~|~03/IMS~|~Grant Ave bridge replacement 103487~|~1~|~4~|~04/NHS~|~North abutment of future structure FRA-71-14.61P 103487~|~1~|~6~|~06/IMS/AEP~|~100% AEP items to be done as part of the project 103487~|~1~|~7~|~07/MPO/Cols~|~MORPC/City funded enhancement items 103487~|~1~|~5~|~05/IMS~|~Project eligible utility items 103487~|~1~|~8~|~08/IMS/Cols~|~100% Columbus items 103487~|~1~|~9~|~09/ENH/Cols~|~Incremental items - Columbus to pay the difference above standard items 103487~|~2~|~10~|~10/IMS~|~Bridge repair on several structures over IR 70 and IR 71 103487~|~1~|~11~|~11/SAF~|~Repair attenuators and guardrail damaged by vehicle accidents 85032~|~1~|~1~|~01/BRF~|~0834076 BRO CR105 0.05 Intersect: E Fork Little Miami RiverNon Fed Aid. BR eligible. 80/20 split w/Brown Co. local match. 01/BRF/BR/BRO 121455~|~1~|~1~|~01/S>2/NFRA~|~Resurfacing, urban paving in New Franklin. 92516~|~1~|~1~|~01/ERD/CAMB~|~"01/ERD/BR/CAMB" City of Cambridge rehabilitation of Historic Armstrong Coverd Bridge utilizing Historic Bridge Funds with a project cap of $168,000.00 108711~|~1~|~1~|~01/S<2~|~Full reconstruction with cement subgrade stabilization of existing roadway. The work will include widening the roadway out to two 12? lanes with 8? paved shoulders. Additionally, underdrains will be installed to improve subgrade drainage and the existing ditches will be regraded to improve storm drainage. 108711~|~1~|~2~|~02/S<2~|~Lighting to be paid by the City. 90570~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 120072~|~1~|~1~|~01/NFA~|~NEVI Round 2 76-B 116264~|~1~|~1~|~01/SAF~|~Left turn lanes on SR-125 at Sugartree Rd 124353~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federal bridges on interstate system 93523~|~1~|~1~|~01/NFP~|~100% 4MA7 funding for facility renovation 104801~|~1~|~1~|~01/BRO~|~Plan split for bridge drainage repair 85605~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds. 109726~|~1~|~1~|~01/NHS~|~AC Overlay without repairs 109726~|~1~|~2~|~02/STR~|~Curb ramps on SR197 and South Street 93040~|~1~|~3~|~03/STR~|~Plan Split 04/STR/BR/ - District Bridge Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP 93040~|~1~|~4~|~04/S<2~|~Plan Split 05/S<2/BR/ - District Bridge Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP 93040~|~1~|~2~|~02/STR~|~District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-SR 37-19.68 to 28.20 93040~|~1~|~1~|~01/S<2/LANC~|~District Preservation Urban Paving - See CAP Comment - Resurfacing with related work in the City of Lancaster on Fai-SR 37-19.13 to 19.68. Lancaster portion of costs to be paid via CRRSSA funds (C227/LA05) 109574~|~1~|~1~|~01/STR~|~Culvert ReplacementADA 247 13.22 & 21.18 95644~|~1~|~1~|~01/MPO~|~To provide intermediate enhance reference location signs along the mainline of IR 70 from slm 16.39 to 26.97 and to provide ramp enhanced reference location signs at the interchanges at slms 16.60,18.17,20.00,20.37 to 21.65 and 26.63. 115445~|~1~|~1~|~01/S>2~|~This plan split includes all work needed to construct the project, which will add sidewalk according to the project description. 103358~|~1~|~1~|~01/S>2~|~Construction of cantilever style dynamic message signs in 4 interstate locations. 89433~|~1~|~1~|~01/MPO~|~Upgrade the existing signal at Mitchell BLVD and Belmont Avenue. 92105~|~1~|~1~|~01/NHS~|~Rehabilitation of the 4-Lane section of US 42 in Warren and Greene Counites. This work is primarily pavement rehabilitation. The existing pavement to be break & seat with a new asphalt overlay. This Planning Split is for the NHS portion of the project on WAR US 42 from SLM 17.94 to 19.88 92105~|~1~|~2~|~02/STR~|~Rehabilitation of the 4-Lane section of US 42 in Warren and Greene Counites. This work is primarily pavement rehabilitation. The existing pavement to be break & seat with a new asphalt overlay. This Planning Split is for the Rural portion of the project on WAR US 42 from SLM 19.88 to 24.74 and GRE US 42 from SLM 0.0 to 1.99 110642~|~1~|~1~|~01/NHS~|~Resurfacing. 110642~|~1~|~2~|~02/NHS~|~Minor bridge work. 94281~|~1~|~1~|~01/NFP~|~Construct a new ODOT garage on SR41 across from the current Adams County ODOT Garage. 01/NFA/OT/State 101765~|~1~|~2~|~02/S>2/REYN~|~Resurfacing inside of city of Reynoldsburg. 101765~|~1~|~1~|~01/S>2/PICK~|~Resurfacing inside of city of Pickerington. 92328~|~1~|~1~|~01/STR~|~Culvert replacement project. ATH 13 16.39, SFN 0500488 and ATH 78 4.70, SFN 0502731. Federal 80% and State 20%. 115022~|~1~|~1~|~01/BRF/CORT~|~Bridge replacement. 118862~|~1~|~1~|~01/S5K~|~plan split 97238~|~1~|~1~|~01/STR~|~BRO US 62 25.50 109026~|~1~|~1~|~01/STR~|~CRA SR 0096 03.88 & 04.18 Culvert Replacements 120441~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7) 103075~|~1~|~1~|~01/S>2~|~Mill and resurfacing of STP route 93430~|~1~|~1~|~01/NHS~|~priority system preventive maintenance on JEF-22-0.00 to 3.86; includes resurfacing with asphalt, minimal repairs, pavement marking 94249~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split. 91999~|~1~|~1~|~01/STR~|~BRO US62 20.26-30.45 resurfacing projectOn US62, begin project 0.48 mile east of TR527 (Burbage Rd.) and terminate at the Highland Co. line. Brdg to pave thru:0801453 BRO US62 26.03 Intersect: West Fork Ohio Brush80/20 split 110996~|~1~|~1~|~01/SAF~|~Part 1, Safety Eligible: Traffic signal replacement including upgrades to backplates and signal coordination at US-22 and Walmart drive. 110996~|~1~|~2~|~02/SAF~|~Part 1, 100% Local: Plan split for 100% local work including construction of the loon and extension of pedestrian facilities. 110996~|~2~|~6~|~06/SAF~|~Part 2, Safety Eligible Items: Upgrade existing signals, remove unwarranted signals, implement signal coordination, and upgrade school zone signing/flasher/markings along US 22. 110996~|~2~|~4~|~04/S<2~|~Part 2, Urban Paving Eligible, Non-NHS: FY2020 Urban Paving for the City of Wilmington on US 22 within the City of Wilmington. The limits are 0.00 to 0.210 on CLI US 22D. This Plan split is for the items paid at 80% ODOT and 20% City on STP > 2 route, mainly consists of planing, new asphalt overlay and final striping. 110996~|~2~|~3~|~03/S<2~|~Part 2: Urban Paving Eligible, NHS: FY2020 Urban Paving for the City of Wilmington on US 22 within the City of Wilmington. The limits are 10.00 to 12.57 on CLI US 22. This plan split is for the items paid at 80% ODOT and 20% City on the NHS portion, mainly consists of planning, new asphalt overlay and final striping. 110996~|~2~|~5~|~05/S<2~|~Part 2, 100% Local Urban Paving Items. This plan split is for the items paid at 100% City, mainly consists of pavement repair, MOT striping, utility work, curb & gutter and curb ramps. The limits are 10.00 to 12.57 on CLI US 22 and 0.00 to 0.210 on CLI US 22D. 110996~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment 107638~|~1~|~1~|~01/STR~|~Replace ADA 247 3.50 (0103713) 98948~|~1~|~1~|~01/STR~|~Signal Work on SCI US 23 11.44 88911~|~1~|~5~|~05/STR~|~Resurfacing of SUM-SR176 from SLM 3.84 to SLM 5.20 and SUM-SR303 from SLM 0.00 to SLM 0.90 and SLM 3.42 to SLM 5.49, in Richfield Township, Summit County, Ohio. 88911~|~1~|~4~|~04/S>2~|~Resurfacing of SUM-SR176, from SLM 0.25 to SLM 1.05, SLM 1.13 to SLM 3.84 and SLM 5.20 to SLM 5.59 and SUM-SR303, from SLM 0.90 to SLM 3.42, in the Village of Richfield, Summit County, Ohio. 88911~|~1~|~2~|~02/BRO~|~Structure work on SFN# 7709862, SUM-SR-303-3.73 over Furnace Creek, in Richfield Township, Summit County, Ohio. 88911~|~1~|~3~|~03/STR~|~Bridge work on SFN# 7709854, SUM-SR303-0.15 over Rocky River, Richfield Township, Summit County, Ohio. 88911~|~1~|~1~|~01/IMS~|~Bridge work on SFN 7707711, SUM-SR176-0.26 over SUM IR 77, in the Village of Richfield, Summit County, Ohio. 88911~|~2~|~6~|~06/S>2/RICH~|~100% Village Items - Curb, Gutter and replacing all Catch Basins along SR 21 within the Village of Richfield, Summit County, Ohio. 87943~|~1~|~1~|~01/IMS~|~4803272 LUC IR75 3.64 Intersect: Bancroft St 77264~|~1~|~1~|~01/IMS~|~Reconstruct the Northern Kenmore Leg and West Leg interchange of IR-76 and IR-77 in the City of Akron, Summit County, Ohio. 92917~|~1~|~1~|~01/SAF~|~US-50: Approximately 0.25 miles east of Dry Run Road Widening of shoulder on south side to address obstructions and drop offs. Aquisition of 1 parcel or right of way on the south side of US-50 is required. 121888~|~1~|~2~|~02/STR~|~All work along federal aid routes such as SR 111 and SR 500. 121888~|~1~|~1~|~01/NFA~|~All work along local routes within the village that are not on the federal aid system. 98621~|~1~|~1~|~01/IMS~|~Split for 100% state funding for project work. 95145~|~1~|~1~|~01/NFP~|~100% State funded RPM replacement in D-05 112701~|~1~|~1~|~01/IMS~|~Remove bridge at FRA-670-3.87A 103402~|~1~|~1~|~01/NFP~|~ODNR ProjectMicrosurface multiple routes in Shawnee State Forest. 122473~|~1~|~1~|~01/STR~|~All work included in this split. 114479~|~1~|~1~|~01/NFP~|~Spot paving various locations in District 11 123240~|~1~|~1~|~01/S5K~|~Program Project. 87381~|~1~|~1~|~01/IMS~|~Remove and replace twin bridges with deficient decks and abutements with minimum of approach work on SFN 5502918 MIA 75 1415 L and SFN 5502942 MIA 75 1415 R (Branch of the Great Miami River.) 119343~|~1~|~1~|~01/IMS~|~Resurfacing. 100057~|~1~|~1~|~01/BRO~|~Zone Paint Lower CordBridge on System Eligible 115549~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in POR, STA and SUM counties. 96567~|~1~|~1~|~01/SAF~|~Traffic Signal @ SR94 / I271 Ramp 103681~|~1~|~1~|~01/STR~|~Landslide repair on ATH CR 20 4.47-4.50. DSR ATH-006. 80% Federal ER funds and 20% Local. 103681~|~1~|~2~|~02/STR~|~Landslide repair on DSR ATH-007. ER funds are 80% and 20% local. ATH CR 20 5.27-5.29. 103681~|~1~|~3~|~03/S<2~|~Landslide repair on ATH CR 25 7.95, DSR ATH-008. Federal ER funds 80% and 20% Local. 124488~|~1~|~1~|~01/IMS~|~Improvements to IR 71 to increase safety and reduce congestion 107835~|~1~|~1~|~01/STR~|~All work in this split. The bridge being replaced meets the state but not the federal definition of a bridge. Funds from the District Preservation Program budget. 107390~|~1~|~1~|~01/NFP~|~Landscaping maintenance on various Interstate routes in Franklin County 75530~|~1~|~1~|~01/NHS~|~Resurfacing on the National Highway System (NHS) 112680~|~1~|~1~|~01/NFP~|~Resurfacing of District-maintained service roads. 100769~|~1~|~1~|~01/NFP~|~RPM's on various routes throught District Six 107500~|~1~|~1~|~01/STR~|~Resurfacing HOL-62 100647~|~1~|~1~|~01/STR~|~Chip sealing of JEF-152 from Dillonvale NCL to Smithfield SCL and from SLM 8.85 to Richmond SCL. Chip sealing JEF-213 from TR 1128 to SR 7. 100647~|~1~|~2~|~02/S<2~|~Chip sealing JEF-152 from US-22 to SLM 8.85. 106446~|~1~|~1~|~01/NFA~|~The Village will improve and widen by 4 feet approximately 1925 feet of CR 96 near the intersection of CR 20 in the Village of Carey, Ohio. 101272~|~1~|~1~|~01/NHS~|~Resurfacing US 20 in Fulton County. 101272~|~1~|~2~|~02/NHS~|~NHS bridge plan split 97387~|~1~|~1~|~01/NHS~|~Bridge Rehab: SFN 3901505 (HUR-20-25.62) 114092~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 122039~|~1~|~1~|~01/NFA~|~Created for ODOT TID fudning 107990~|~1~|~1~|~01/S<2~|~Type A emergency landslide repair. 96297~|~1~|~1~|~01/S<2~|~Bridge replacement SR 776 (SFN 4004264, SLM 10.87) 96297~|~1~|~2~|~02/STR~|~Bridge replacement SR 327 (SFN 4003306, SLM 0.77) 109270~|~1~|~1~|~01/NHS~|~Plan split for major rehab work 109270~|~1~|~2~|~02/NHS~|~Plan split for reimbursement from utility for damage to storm system during gas line relocation 105548~|~1~|~2~|~02/S<2~|~Marion urban area plan split MAR-95-11.36-13.10 MAR-423-11.37-12.08 105548~|~1~|~1~|~01/STR~|~Rural plan split MAR-37-3.31-7.29 MAR-95-4.48-11.36 MAR-423-12.08-16.37 101531~|~1~|~1~|~01/STR~|~DSR# TUS-007 102581~|~1~|~4~|~04/NHS~|~Work on the NHS. Work on SR 65 in Allen County from SR 115 at 11.24 to the Lutz Road at 11.71. District Preservation Program funds. 102581~|~1~|~1~|~01/NFA~|~Work on SR 634 in Putnam County which is a rural minor collector and not eligible to federal aid. On SR 634 in Putnam County from US 224 at 2.82 to SR 114 at 8.17 and from SR 114 at 8.33 to SR 613 at 13.44. State funds from the District Preservation Program budget. 102581~|~1~|~2~|~02/S<2~|~Work on SR 65 in Allen County from Lutz Road at 11.71 to the Lima Urbanized Area boundary at 13.91.Work on SR 81 in Allen County from the Lima Urbanized Area at 10.70 to Eastown Road at 13.47. Work on SR 15 in Defiance County from Defiance Urban area boundary at 10.62 to the concrete pavement at US 24 at 13.15. Work on SR 53 from the Corporation Limits on the City of Kenton at 1.41 to the Corporation limits of the City of Kenton at 1.54 and from the corporation limits of the City of Kenton at 1.92 which is at TR 114 to the Kenton Urban Area boundary at 2.50. Funds from the District Preservation Program budget. 102581~|~1~|~5~|~05/S<2/KENT~|~Work inside the City of Kenton. Work on SR 53 from E. Forest St./Patterson Ave. at SLM 1.34 in the City of Kenton to the corporation limits of the City of Kenton at 1.41 and from the corporation limits of the City of Kenton at 1.54 to the corporation limits of the City of Kenton at 1.92 which is at TR 114. 80% federal funds from the District Preservation program budget with a 20% match provided by the City of Kenton. 102581~|~1~|~3~|~03/STR~|~Work on SR 65 from the Lima Urbanized Area boundary at 13.91 to the Putnam County line at 19.06. Work on SR 15 in Defiance County from the Williams County line at 0.00 to the Defiance Urban Area boundary at 10.62.Work on SR 81 in Allen County from the SR 66 overlap at 3.31 to the Lima Urbanized Area boundary at 10.70. Work on SR 53 in Hardin County from the Kenton Urban Area boundary at 2.50 to SR 37 at 12.39. On SR 66 in Paulding County on the SR 66/SR 613 overlap in the Village of Oakwood which is from 8.18 to 8.39. Work on SR 114 in Paulding County from the Indiana State line at 0.00 to US 127 at 12.05. Work on SR 613 in Paulding County from SR 637 at 17.59 to SR 66 at 22.59 and from SR 66 at 22.80 to the Putnam County line at 24.81. Work on SR 637 in Paulding County from the Van Wert County line at 0.00 to the south corporation limits of the Village of Grover Hill at 1.76 and from the north corporation limits of the Village of Grover Hill at 2.26 to SR 613 at 7.04. Work on SR199 from the NCL of Upper Sandusky at 7.35 to SR103 at 14.21. Work on SR 37 in Hardin County from the Hancock County line at 0.00 to the Wyandot County line at 2.36. Funds from the District Preservation Program budget. 124975~|~1~|~1~|~01/MPO/MILT~|~Replace and install new sidewalks and pedestrian lighting. 104809~|~1~|~1~|~01/NHS~|~Add LED enhanced Signal Ahead signs with distance plaques to the WB approach to US-35 @ Valley/Trebein Rd and to the EB approach to US-35 @ Factory (total of 4); add supplemental nearside signal heads to all US-35 mainline approaches (total of 6) 80961~|~1~|~3~|~03/NFP~|~100% local funding split 80961~|~1~|~2~|~02/S>2~|~80/20 fed/local funding split for urban paving eligible work 80961~|~1~|~1~|~01/S>2~|~80/20 fed/local funding split for work using MPO STP funds 110966~|~1~|~1~|~01/S<2~|~Landslide repair project. MOE 536 1.70-1.74. Funded 100% State ER. 108676~|~1~|~1~|~01/NHS~|~Landslide repair project. MOE 7 7.55. NHS route funded 80 federal/20 state. 88775~|~1~|~1~|~01/BRO~|~Replace deteriorated bridge superstructure with minimal approach work on SFN 5703697 MOT SR 48 1320 over the Great Miami River. 91925~|~1~|~3~|~03/S<2~|~Urban - Guardrail ProjectCO CC Urban:SCI -SR -140 1.130 to 2.260 0.000 Lane MilesROS -US -50 19.060 to 19.930 1.740 Lane MilesSCI -SR -140 0.400 to 1.130 0.000 Lane Miles80/20 split03/S<2/OTH/State 91925~|~1~|~5~|~05/SAF~|~Safety - Guardrail ProjectAll end assyblies are on each route liseted on the other 4 slplits.CO CC Safety: For the upgrade of all end assymblies.CO CC Rural: LAW -SR -775 8.820 to 9.250 0.860 safety funds only on end assy'sBRO -SR -125 20.040 to 22.540 5.000 safety funds only on end assy'sROS -SR -772 11.840 to 12.970 2.260 safety funds only on end assy'sSCI -SR -125 0.800 to 1.660 1.720 safety funds only on end assy'sADA -SR -125 1.580 to 4.670 6.180 safety funds only on end assy'sPIK -SR -104 5.460 to 6.160 1.400 safety funds only on end assy'sSCI -SR -73 20.460 to 22.900 4.880 safety funds only on end assy'sLAW -SR -93 3.100 to 5.970 5.740 all safety funds HIG -US -50 6.290 to 10.100 7.620 safety funds only on end assy'sLAW -SR -93 22.960 to 26.680 7.440 safety funds only on end assy'sBRO -US -68 31.060 to 31.070 0.020 all safety fundsSCI -US -52 14.940 to 15.190 0.500 safety funds only on end assy'sCO CC NHS:ROS -US -23 13.200 to 15.510 all safety fundsPIK -SR -32 13.860 to 15.810 all safety fundsBRO -SR -32 8.450 to 8.530 all safety fundsSCI -US -23 11.120 to 11.180 safety funds only on end assy'sSCI -US -52 31.420 to 31.890 safety funds only on end assy'sCO CC Urban:SCI -SR -140 1.130 to 2.260 safety funds only on end assy'sLAW -SR -7 3.580 to 6.110 all safety fundsROS -US -50 19.060 to 19.930 safety funds only on end assy'sSCI -SR -140 0.400 to 1.130 safety funds only on end assy's100% federal safety funds05/SAF/OT/State 91925~|~1~|~2~|~02/NHS~|~NHS - Guardrail Project. CO CC NHS:SCI -US -23 11.120 to 11.180 0.240 Lane MilesSCI -US -52 31.420 to 31.890 1.880 Lane Mile 80/20 split02/NHS/OTH/State 91925~|~1~|~1~|~01/STR~|~Rural - Guardrail Project. CO CC Rural: LAW -SR -775 8.820 to 9.250 0.860 Lane MilesBRO -SR -125 20.040 to 22.540 5.000 Lane MilesROS -SR -772 11.840 to 12.970 2.260 Lane MilesSCI -SR -125 0.800 to 1.660 1.720 Lane MilesADA -SR -125 1.580 to 4.670 6.180 Lane MilesPIK -SR -104 5.460 to 6.160 1.400 Lane MilesSCI -SR -73 20.460 to 22.900 4.880 Lane MilesHIG -US -50 6.290 to 10.100 7.620 Lane MilesLAW -SR -93 22.960 to 26.680 7.440 Lane Miles80%/20% split01/STR/OT/State 91925~|~1~|~4~|~04/NFP~|~NFA - Guardrail ProjectCO CC NFA:LAW -SR -775 9.530 to 13.290 7.520 Lane Miles 100% State04/NFA/OT/State 94192~|~1~|~2~|~02/S<2~|~Project includes rehabilitating bridge PRE-35-1541 over Bantas Fork by replacing the rigid overlay. 94192~|~1~|~1~|~01/S<2~|~Project includes rehabilitating bridge PRE-35-1258 (SFN 6800246) over Rock Run by replacing the superstructure and abutment stems down of the top of footing. 94127~|~1~|~1~|~01/S<2~|~Resurfacing of STA US 62 from SLM 35.72 to 36.02. 94127~|~1~|~2~|~02/S<2/ALLI~|~80/20 Resurfacing of STA-US 62 from 36.02 to 36.45 and 37.84 to 38.63, urban paving in the City of Alliance. 94127~|~2~|~5~|~05/MPO/ALLI~|~100% City of Alliance items sidewalks (part 2). 94127~|~1~|~3~|~03/S<2~|~Bridge Maintenance to linked structure > 20' span. 94127~|~1~|~4~|~04/MPO/ALLI~|~100% City of Alliance items, curb and gutter, partial depth repairs, full depth repairs (part 1). 84135~|~1~|~1~|~01/IMS~|~Erosion/slide correction of Southbound Interstate 77 ramp at Copley Road, in the City of Akron, Summit County, Ohio. 112849~|~1~|~1~|~01/BRF~|~Bridge replacement > 20' span. 95304~|~1~|~1~|~01/ENH~|~This project consists of installation of bike lanes on Valley Street (CR 525), Rita Street and Stanley Avenue (CR 601). 104298~|~1~|~1~|~01/IMS~|~Split for resurfacing work 94720~|~1~|~1~|~01/NFA~|~Construction of new bridge on Hadlock Road (TR-335) over Ashtabula River in Ashtabula County, Ohio. 115876~|~1~|~1~|~01/NFP~|~Split for bridge work 121496~|~1~|~1~|~01/NFP~|~Operations completed chip seal installation. 107509~|~1~|~1~|~01/STR~|~Resurfacing COL-45 116550~|~1~|~1~|~01/MPO/SILV~|~Reconstruction of Plainfield Road, realignment of Plainfield & Montgomery intersection, realignment of the Montgomery Road and Alpine/Section Road intersection. 76256~|~1~|~2~|~02/NHS~|~Major New portion of Phase 8 project limits from 14.50 to 16.50, Glendale Milford to Kemper 76256~|~1~|~1~|~01/IMS~|~Major Rehab portion of Phase 8 project limits from 14.50 to 16.50, Glendale Milford to Kemper. 76256~|~1~|~3~|~03/IMS~|~In-Lieu Fee Mitigation - 4SW7 funds. 76256~|~1~|~4~|~04/IMS~|~Bridge reconstruction added capacity 76256~|~1~|~5~|~05/IMS~|~Bridge reconstruction no added capacity 76256~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 117558~|~1~|~1~|~01/NFP~|~various guardrail locations. 98315~|~1~|~1~|~01/IMS~|~Districtwide fast dry pavement marking contract 97441~|~1~|~1~|~01/SAF~|~Install left turn lane on CR 32 (Middle Ridge Roadf) at TR 39 (Oberlin Road), realign skewed intersection and improve sight distance. 124928~|~1~|~1~|~01/STR~|~linked roadway roundabout project. 98812~|~1~|~1~|~01/NHS~|~Providing 7100' of new sidwalks along North Broadway in conjunction with City's new curb adn gutter project and ODOT''s resurfacing project within the City of Greenville. SR 49 SLM 17.35 - 17.64 98812~|~1~|~2~|~02/S<2~|~Providing 7100' of new sidewalks along North Broadway in conjunction with Ciry's new curb and gutter project and ODOT's resurfacing project within the City of Greenville. SR 118 SLM 0.56 - 1.85 107043~|~1~|~1~|~01/NFP~|~Resurfacing West Newport Drive in Mill Creek Park. 111390~|~1~|~1~|~01/NFP~|~All work in the project 123541~|~1~|~1~|~01/IMS~|~All work associated with the resurfacing of IR 71 123214~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment. WAS 50 0.00-3.58. NHS route funded 80 Federal/20 State. 123214~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. WAS 618 0.00-0.16. Urban other federal aid funded 80 Federal/20 State. 120258~|~1~|~1~|~01/NFA~|~Construct sidewalk, ADA curb ramps, and pedestrian crossings along Shewango Way (MR-3843) in the City of Madeira. 90973~|~2~|~4~|~04/IMS~|~Minor bridge work to the linked structures > 20' span. 90973~|~1~|~1~|~01/IMS~|~Replacement of linked structures > 20' span. 90973~|~1~|~2~|~02/IMS~|~Resurfacing STA IR 77 from 8.36 to 9.50. 90973~|~1~|~3~|~03/NHS~|~Replacing the linked structure > 20' span. 90973~|~2~|~5~|~05/NHS~|~Minor bridge work to the linked structures > 20' span. 90973~|~1~|~6~|~06/IMS~|~Rehab of linked structures > 20' span. 90973~|~1~|~7~|~07/NHS~|~Minor rehab work to linked structure > 20' span. 90973~|~1~|~8~|~08/NFP~|~Retroactive fuel price adjustment 87698~|~1~|~2~|~02/S<2~|~LOR-511-21.14 to 22.50 87698~|~1~|~1~|~01/NHS~|~HUR US 20 & LOR US 20 87698~|~1~|~3~|~03/STR~|~LOR SR 511 - 21.42 to 22.63 87698~|~1~|~5~|~05/NHS~|~80/20 Fed/City - LOR-20-6.23 to 6.59 - City of Oberlin 87698~|~1~|~7~|~07/NHS~|~80/20 Fed/City - HUR-20-16.26 to 16.84 - City of Norwalk 87698~|~1~|~4~|~04/NHS~|~Minor Bridge Work 87698~|~1~|~6~|~06/NHS~|~100% City - LOR-20-6.23 to 6.59 - City of Oberlin 87698~|~1~|~8~|~08/NHS~|~100% City - HUR-20-16.26 to 16.84 - City of Norwalk 87698~|~1~|~9~|~09/NHS~|~Bridge work Hur 20 22.81 and 24.49 (under 20') 108481~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH 13 0.60, DSR ATH-013. Rural other federal aid funded 100% federal. 92983~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-SR 79-06.43 to 08.12 92983~|~1~|~1~|~01/NHS/HEAT~|~District Preservation Urban Paving 4PF7 (80% Federal) / 4BG7 (20% Local) - Two CAP's 4TA7 & 4PS7 (See CAP Comments) - Resurfacing with related work in the City of Heath on Lic-SR 79-08.12 to 11.43 102845~|~1~|~1~|~01/NFA~|~D09 Auxiliary Markings (A) FY2022 124377~|~1~|~1~|~01/STR/SOME~|~Culvert repair/rehabilitation. 119951~|~1~|~1~|~01/NHS~|~added plan split. 109679~|~1~|~1~|~01/STR~|~Resurfacing SR 800 111265~|~1~|~1~|~01/NFA~|~Resurfacing of Highlandtown Wildlife Facility parking lot in COL county 76433~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing on IR 70 from 00.00 to 06.51 76433~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - District Preservation Marking Pavements 4PF7 (90% Federal) / 4PS7(10% State) - No CAP - Striping after resurfacing on IR 70 from 00.00 to 06.51 99515~|~1~|~1~|~01/SAF~|~This plan split includes realigning SR-123 and all associated work. 96610~|~1~|~1~|~01/NHS~|~The project will primarily replace the existing reinforced concrete deck with a new reinforced concrete deck for Bridge TUS-36-1724T (SFN 7900384). The steel beams will be painted and the approach slabs will be replaced. 98495~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 110258~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 15.32. Funded 100% State ER. 112547~|~1~|~1~|~01/NHS~|~plan split for the resurfacing on GRE-4 107539~|~1~|~3~|~03/NHS~|~Resurfacing SR 39 between the SR 7 ramps in Wellsville 107539~|~1~|~1~|~01/STR~|~Resurfacing COL-45 from Wellsville to US 30 107539~|~1~|~2~|~02/S<2~|~Resurfacing SR 39 from the Wellsville WCL to the SR 7 SB Ramps; SR 45 from SLM 0.36 to SLM 0.89 100245~|~1~|~1~|~01/MPO~|~Repair and resurface Mayfield Road using MPO STP funds. 119932~|~1~|~1~|~01/S5K~|~Replace Culvert at Grand Lake St. Mary's 124325~|~1~|~1~|~01/STR~|~Slide repair utilizing Ohio & Shale and OPWC funding (State Only) up to the respective CAPs. 91517~|~1~|~1~|~01/BRO~|~Rehabilitate/Replace existing truss bridge (TUS-36-1205, SFN 7900333). In the preliminary phase a feasibility analysis will be performed to determine the most financially viable option for rehabilitating the structure or eplacing it. Based upon the study detailed plans will be developed for the preferred alternative. 91517~|~1~|~2~|~02/NHS~|~On going services to be provided by Consultant for bridge TUS-36-1205 during Construction 103799~|~1~|~1~|~01/SAF~|~SRTS sidewalk - Wapakoneta 112982~|~1~|~1~|~01/SAF~|~Replace median barrier on FRA-70 from Broad St (SLM 11.22) to Souder Ave. (SLM 12.80) 120544~|~1~|~1~|~01/NFA~|~Asphalt Overlay CR 5 at 0.00-3.55 119348~|~1~|~1~|~01/S>2~|~Superstructure replacement. 119454~|~1~|~1~|~01/S>2/YOUN~|~Sidewalk and curb ramp replacements, ADA curb ramps, crosswalk striping and bicycle repair station installation. 85341~|~1~|~1~|~01/ENH~|~BRO US52 12.30-12.62 Ripley St Scape TE ProjectOn US52, within the corp limits of the Village of Ripley, it is proposed to construct a Street Scape on Second Street (US52) beginning at Main St west to US62/68 intersection with US52.80/20 split w/local match by Ripley. 01/ENH/OT/Ripley 104582~|~1~|~1~|~01/MPO~|~Resurfacing of CR 17 in the City of Barberton. 104582~|~1~|~2~|~02/SAE/BARB~|~Restriping and intersection improvement of Wooster/Hopocan in the City of Barberton, Summit County, Ohio. 87089~|~1~|~1~|~01/MPO~|~Widen Yankee Street from Austin Pike/Social Row to Winding Green Way from two to five lanes, bikepath maintenance on Yankee. 87089~|~1~|~2~|~02/MPO~|~This plan split is for the ongoing services. 117131~|~1~|~1~|~01/MPO/FAIR~|~Concrete pavement repair on Dayton-Yellow Springs Road from Skyhawk Court to Gateway Drive. 102746~|~1~|~2~|~02/STR~|~plan split for the bridge overlay on GRE-42-2029 102746~|~1~|~1~|~01/STR~|~This plan split is for the bridge replacement on GRE-42-0265 105562~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-734-2.07-5.23 FAY-22-11.48-14.13 & 15.57-15.91 105562~|~1~|~2~|~02/NFA~|~Not on Federal Aid System Plan Split: FAY-753-5.24-5.52 123122~|~1~|~1~|~01/STR~|~Bridge Replacement Noble SR 821-15.84 (SFN: 61025734) 108597~|~1~|~1~|~01/NFP~|~The CITY is reconstructing 4,400 feet of Carter Street, specifically from Cochran Road to Davis Industrial Parkway 99702~|~1~|~1~|~01/NFP~|~Spot paving repairs on various routes in Portage, Stark, and Summit Counties. 99702~|~1~|~2~|~02/S>2/TWIN~|~Resurfacing of SUM SR 82 between SLM 6.20 and SLM 7.18 in the City of Twinsburg, Summit County, Ohio. 124756~|~1~|~1~|~01/ENH~|~Reduce lanes on Center St and Church St from 3 to 2, install a 6' bike lane separated by a 4.5' elevated island, replace and widen sidewalks to 13', and incorporate 10' parallel parking lanes. Project includes pavement markings on Church St from Garden St to Sargent St and on Sargent St from Church St to Center St to differentiate lanes. 114477~|~1~|~1~|~01/NHS~|~Asphalt overlay of US 22 104035~|~1~|~1~|~01/STR~|~Asphalt resurfacing project on ATH CR 33A 0.00-8.71. Funded 80 federal/20 local. 104035~|~1~|~2~|~02/S<2~|~Asphalt resurfacing project on the Urban System. ATH CR 110 2.64-3.12 and CR 33 8.12-8.71. 80/20% Federal/Local. 93193~|~1~|~1~|~01/STR~|~General system paving of MAR-95: 0-4.50 118435~|~1~|~1~|~01/NFA~|~Bridge Rehabilitation project - superstructure only - CEAO funded BFP (3 round) 110875~|~1~|~1~|~01/STR~|~Landslide repair. 123510~|~1~|~1~|~01/NHS/GREE~|~Resurfacing, urban paving in the City of Green. 102294~|~1~|~1~|~01/NFP~|~Crack Sealing of various State routes 103736~|~1~|~1~|~01/SAE~|~District wide guardrail project to replace Type A Anchor assemblies on the NHS system. 100% safety program funds, SAC 4HJ7, from the Central Office controlled safety program. This includes work on US 68 and SR 309 in Hardin County, on US 33 and US 224 in Van Wert County and SR 65 in Allen County. 103736~|~1~|~3~|~03/S<2~|~Repair or replace guardrail sections and/or posts as needed at locations on the Urban STP system. This includes the following locations. DEF-15-11.70, DEF-281-1.35 and WYA-199-6.93. Funding is from the District Preservation Program. 103736~|~1~|~4~|~04/STR~|~Repair or replace guardrail sections and/or posts as needed at location on the Rural STP system. This includes all locations not covered in the other plan splits. Funding is from the District Preservation Program. Work on SR 15 in Defiance County except for 11.70, Work on SR 249 in Defiance County, all work in Paulding County. work on US 224 in Van Wert County at 12.02 and all work in Wyandot County except for WYA-199-6.93. 103736~|~1~|~2~|~02/NHS~|~Repair or replace guardrail sections and/or posts as needed at locations on the NHS system not funded by the safety program. This includes all five locations on SR 15 in Hancock County and a location on US 30 in Van Wert County. Funding is from the District Preservation Program. Federal NHS funds. This split covers work at locations that don't replace Type A anchor assemblies. 89097~|~1~|~2~|~02/NHS~|~NHS funding to pave culvert inverts at:UNI-33-15.08 89097~|~1~|~1~|~01/IMS~|~IM funding to pave culvert inverts at:FRA-71-11.37FRA-71-27.9FRA-270-54.60MAD-71-2.16MAD-71-11.56MAD-71-6.10 89097~|~1~|~4~|~04/NFA~|~100% State funding to pave culvert inverts at:FAY-734-8.09 89097~|~1~|~3~|~03/STR~|~STP Rural funding to pave culvert inverts at:MAD-42-22.85MAD-56-14.90MAD-665-10.71MRW-529-3.21PIC-22-9.19 119006~|~1~|~1~|~01/BRF~|~Bridge replacement. All work included in this split. 111327~|~1~|~1~|~01/S<2~|~Tree Cutting on LAW SR 7 0.66 87400~|~1~|~1~|~01/STR~|~Repair deteriorated abutement to extend service life of structures with no approach work on SFN AUG 29 9.73 over Schmier Ditch, .03 mile North of SR 219 and SFN 5400694 MER 49 2.17 over 2 Mile Creek, 2.17 miles North of Dar County Line and MER 29 4.86 SFN 5400155 rebuild approximately 3 ft. of the deck edges, waterproof edges and overlap existing (old over new). Also reface the abutments using anodes and upper haunches to carch deck spalls. Patch wingwalls, seal asphalt joints (centerline and deck edge joints). 119556~|~1~|~1~|~01/NFA~|~Install Bike Connector 101014~|~1~|~1~|~01/STR~|~This plan split is for the rural routes on this project. 101014~|~1~|~2~|~02/NFA~|~This plan split is for the Non-Federal route on this project. 101014~|~1~|~3~|~03/S<2~|~This plan split is for the small urban portion of this project. 124862~|~1~|~1~|~01/NFP~|~Spot paving on various routes in POR, STA and SUM counties. 89313~|~1~|~1~|~01/NFA~|~"01/NFA/CV/ " - District Preservation Culvert Program 4PS7(100% State) - No CAP - Culvert lining at: Gue-SR 662-00.30; 88824~|~1~|~1~|~01/STR~|~District Allocation 120390~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 88591~|~1~|~1~|~01/IMS~|~SFNS 2509725 & 2509784 - FRA 270-11.03 over Scioto Darby Creek; AND SFNS 2509903 & 2509873 - FRA 270-11.80 over CSXRR 99082~|~1~|~1~|~01/S>2~|~Apply herbicides along roadsides for weed control on 4 lane roads - MOT/CLA IR 70/75/675 - US 40/68 - SR 4 120947~|~1~|~1~|~01/STR~|~All work included in this split. Could not choose improvement code in Ellis, should be 47 Bridge Preventive Maintenance 87613~|~1~|~3~|~03/NFA~|~100% local funding to work not eligible for federal funding and to cover cost of construction above the available federal-aid funding (OH393 and MPO STP). 87613~|~1~|~2~|~02/MPO~|~80% federal w/a required 20% local funding for work that is eligible for MPO STP funds. 87613~|~1~|~1~|~01/ERD~|~100% federal funding for sidewalk work that is eligible for federal earmark OH393. 94047~|~1~|~2~|~02/IMS~|~100% State funds for maintenance of raised pavement markers using district system preservation funds. 94047~|~1~|~1~|~01/IMS~|~100% State funds for the maintenance of pavement markings and striping using district striping allocation 98502~|~1~|~1~|~01/STR~|~Guardrail rehabilitation and replacement throughout District 11. 120804~|~1~|~1~|~01/IMS~|~Interchange alternative improvement at I-75/I-275 84826~|~1~|~2~|~02/NHS/SAND~|~100% City of Sandusky Items 84826~|~1~|~1~|~01/NHS/SAND~|~Urban Paving 80/20 Fed/City 109083~|~1~|~1~|~01/NFA~|~J&C funds. 109083~|~1~|~2~|~02/NFA~|~DSA 629 Roadwork Development funds 109083~|~1~|~3~|~03/NFA~|~Montgomery County EDGE fund. 109083~|~1~|~4~|~04/NFA~|~City of Dayton Airport (DAY) 109083~|~1~|~5~|~05/NFA~|~Northpoint Development 109083~|~1~|~6~|~06/NFA~|~MC TID 106902~|~1~|~1~|~01/STR~|~ADA 781 6.60 & 7.40 slide repair. 110283~|~1~|~1~|~01/NFP~|~All work is in this split. 109601~|~1~|~1~|~01/SAF~|~Construct a roundabout at State Route 32 eastbound ramp and various intersection improvements at the westbound 32 ramp and nearby intersections in Mt. Orab.Governor`s 150 location. 109601~|~1~|~2~|~02/NFA~|~Sterling Run portion of project. Split being covered by Village of Mt. Orab. 88898~|~1~|~1~|~01/STR~|~Bridge overlay, expansion joint and bearing replacement for structure CLI-68-0711, SFN 1400967. 88227~|~1~|~1~|~01/MPO~|~Widen to include a center turn lane and new curb and gutter, add 5' sidewalk and tree lawn on both sides of the project, minor utility work and construction of a new sotrm sewer on CR 25A from Looney Road to Indian Ridge Drive. 88227~|~1~|~2~|~02/MPO~|~For the landscaping that is associated with this project. 88709~|~1~|~1~|~01/NHS~|~Costs associated with small culverts BUT-129-2488, BUT-27-0519/0521, and BUT-27-1190. 88709~|~1~|~2~|~02/STR~|~Pave invert of BUT-732-0248 (CMP arch). 88709~|~1~|~3~|~03/S<2~|~Pave invert of BUT-732-0730 (CMP Round pipe). 85874~|~1~|~1~|~01/MPO~|~Newtown Road to .10 east of berkshire Road/Goldengate Drive OKI Add turn lanes at Royalgreen Drive and Berkshire Road/Goldengate Drive, access management modifications, improve lighting, new sidewalk on northsideof project, signalization improvements if warranted at Bartels, Royalgreene Hunley Corbly and Berkshire/Goldengate involving interconnect and preemption and drainage improvements, landscaping, sidewalk and curb. 85874~|~2~|~2~|~02/ENH~|~Greater Cincinnati Water Work items in project 117152~|~1~|~1~|~01/SAF~|~Plan split for crosswalk improvements 109637~|~1~|~1~|~01/SAF~|~Plan Split for the Safety funding 81282~|~1~|~2~|~02/BRO~|~Replacement of sfn# 7632738 structure over the Middle Branch Nimishellen Creek. 81282~|~1~|~1~|~01/CMQ~|~CMAQ eligible items. 104591~|~1~|~1~|~01/MPO~|~Bridge rehab. 95087~|~1~|~2~|~02/S<2/HEBR~|~Village of Hebron - 4BG7 (100% Local) - Ongoing Consultant Services During Construction 95087~|~1~|~1~|~01/S<2/HEBR~|~LCAT's/Village of Hebron sidewalk addition project - 4TB7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Construction of new sidewalks in Village of Hebron. 108086~|~1~|~1~|~01/STR~|~Plan split for construction engineering services. 109530~|~1~|~1~|~01/NFP~|~Split for tree trimming/removal 111850~|~1~|~1~|~01/IMS~|~KYTC's Share of the painting project. 111850~|~1~|~2~|~02/BRO~|~OH's Share of the painting project. 87840~|~1~|~1~|~01/NFA~|~It is proposed to install new and upgrade existing guardrail on the following routes in Ross CountyROS-CR-235 CROSCR00235**C 0.000 to 5.670 ROS-CR-223 CROSCR00223**C 6.470 to 6.680 ROS-CR-235 CROSCR00235**C 5.880 to 9.710 ROS-CR-240 CROSCR00240**C 0.000 to 0.810 ROS-CR-241 CROSCR00241**C 0.000 to 2.380 100% federal 01/NFA/OT/Ross 105419~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate bridges. 105419~|~1~|~2~|~02/STR~|~Bridge repair on rural route bridges. 105419~|~1~|~3~|~03/NHS~|~Bridge repair on NHS route bridges. 105419~|~1~|~4~|~04/S<2~|~Bridge repair on small urban route bridges. 115661~|~1~|~1~|~01/NHS~|~Repair and rebuild pavement that has settled on SR 4 108169~|~1~|~1~|~01/S<2~|~Landslide repair from event OH18-01. 117426~|~1~|~1~|~01/NFA~|~TR 165 (Moriah Rd) superstructure only project 99947~|~1~|~1~|~01/STR~|~HOL-557-2.53 Culvert Replacement 99947~|~1~|~2~|~02/NFA~|~HOL-643-0.42 & HOL-643-3.56 Culvert Replacement. 121402~|~1~|~1~|~01/IMS~|~Resurfacing on FRA IR 70 121402~|~1~|~2~|~02/NHS~|~Resurfacing FRA US 62 92891~|~1~|~2~|~02/NHS~|~100% City of Willard 92891~|~1~|~1~|~01/NHS~|~Urban paving - 80/20 - District Allocation/City of Willard 92891~|~1~|~3~|~03/NHS~|~NHS Pavement outside of Willard Corp Limit (slm 4.60-4.95 RT) 106165~|~1~|~1~|~01/NHS~|~Plan Split 110611~|~1~|~1~|~01/NHS~|~Split for paving on the NHS 110611~|~1~|~2~|~02/NFP~|~Split 2 for 100% local funded items of work. 110611~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 99536~|~1~|~1~|~01/STR~|~STP Rural Culverts: ME-42-11.60, MED-42-12.70 114198~|~1~|~1~|~01/STR~|~Bridge replacement project MEG 681 21.81 (SFN 5303667). 113170~|~1~|~1~|~01/NHS/HEAT~|~Emergency Funds - 4BY7 (Federal 100%) - No CAP -Emergency replacement of Culvert 1874734 that was washed out by heavy rains on 03/20/2020 120287~|~1~|~1~|~01/MPO~|~Federally eligible items. 100862~|~1~|~2~|~02/IMS~|~Bridge rehab on Interstate bridges. 100862~|~1~|~1~|~01/IMS~|~PAvement repairs:MOT IR 75 SLM 7.53 to 11.09 80468~|~1~|~1~|~01/NHS~|~Eliminate at-grade intersections at Factory Road/Shakertown Road and Valley Road by constructing new interchanges. 121975~|~1~|~1~|~01/SAF~|~Plan split for all work associated with roundabout 121975~|~1~|~2~|~02/STR~|~Plan split for water and sewer extension 113407~|~1~|~1~|~01/NFP~|~Split for slide repair work. 116614~|~1~|~1~|~01/NFA~|~Construction Inspection. 79851~|~1~|~1~|~01/NHS~|~Resurfacing 116551~|~1~|~1~|~01/MPO/ANDS~|~New sidewalk along Clough Pike and construction of a pedestrian refuge island with HAWK signal at mid-block crossing. 115767~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of MUS SR 345 00.20 (SFN 6005705) 77261~|~1~|~1~|~01/IMS~|~Reconstruct SR-46 and SR-11 interchanges with IR-80 to improve weave areas, in Austintwon Township, Mahoning County, Ohio. 93857~|~1~|~1~|~01/NFP~|~ODNR parks 100% state 123262~|~1~|~1~|~01/SAF/TUS~|~Guardrail upgrade/replacement on various county routes with 100% (4HB7) CEAO Safety funding. 98493~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP. 121483~|~1~|~1~|~01/S>2~|~STP>200,000 Plan Split 121483~|~1~|~2~|~02/NHS~|~NHS Plan Split 96270~|~1~|~1~|~01/S<2~|~Replace concrete arch structure over Hargus Creek 101396~|~1~|~1~|~01/STR~|~DSR# BEL-006 121686~|~1~|~1~|~01/NFP~|~Resurfacing 121686~|~1~|~2~|~02/STR~|~Rural major collector 101368~|~1~|~1~|~01/IMS~|~Clean expansion joints, beam seats and drainage systems for numerous priority route bridges in Hamilton County. 101368~|~1~|~2~|~02/NHS~|~Bridge cleaning on NHS route bridges. 101368~|~1~|~3~|~03/S>2~|~Bridge cleaning on Large Urban route bridge. 120697~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 37/Pleasantville Road. 112602~|~1~|~1~|~01/NFP~|~Improvements to SR-315 North exit ramp to Goodale St, approx 500 feet for new turn lanes at intersection 111615~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FRA-16-5.35-6.40 115299~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 105080~|~1~|~1~|~01/NFP~|~Systematic sign replacement. 111317~|~1~|~1~|~01/SAE~|~Pavement Marking on various routes in Adams County. 115395~|~1~|~1~|~01/STR~|~Resurfacing project. Rural other federal aid funded 80 federal/20 local. 115395~|~1~|~2~|~02/NFA~|~Resurfacing project. Not on the federal aid system. Funded 80 federal/20 local. 97641~|~1~|~1~|~01/BRF~|~SFN 8758883 97641~|~2~|~2~|~02/BRF~|~SFN 8736375 97641~|~3~|~3~|~03/BRF~|~SFN 8736448 95282~|~1~|~2~|~02/S<2~|~Plan split for Greater Cincinnati Water Works improvements (100% local) being constructed with this project. 95282~|~1~|~1~|~01/S<2~|~Rehabilitation of existing Cheviot Road from SLM 0.00 to 0.64, repair of curb, storm water inlets, and sidewalk. Widening for an additional northbound through lane from Tallahassee Drive to Jessup Road, and profile and alignment adjustments to a sweeping curve south of Jessup Road. 111569~|~1~|~1~|~01/NFP~|~Created plan split for TID funding 124831~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection to a single-lane roundabout 91049~|~1~|~1~|~01/STR/GEA~|~80/20 funding split for all work using federal county STP funds. 97812~|~1~|~1~|~01/MPO~|~Install new Signal on County Route 97266~|~1~|~1~|~01/NHS~|~Rounadabout 95497~|~1~|~1~|~01/S5K~|~District Preservation Paving Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on General System Segments 95497~|~1~|~3~|~03/S5K/ZANE~|~City of Zanesville - 4TA7 (80% Federal) /4BG7 (20% Local) - See CAP Comments - ADA Ramps and other items requested by the City of Zanesville 95497~|~1~|~4~|~04/SAE~|~City of Zanesville Safety Award- - 4HJ7 (100% Federal) - see CAP Comments - - construction of safety related appurtenances (striping, supplemental signal heads, access management devices, signing) along Maple Avenue 95497~|~1~|~2~|~02/S5K/ZANE~|~District Preservation Urban Paving - 4PF7 (80% Federal) //4BG7 (20% Local) - See CAP Comments - Resurfacing in the City of Zanesville with related work on Urpan Paving Segments of SR 60. 91450~|~1~|~2~|~02/STR~|~Deck replacement project on GAL 775 0925 (SFN 2704684). Work also includes steel beam repair and bridge painting. Rural other federal aid funded 80 federal/20 state. 91450~|~1~|~1~|~01/BRF~|~Deck replacement project on GAL 775 0335 (SFN 2704501). Work also includes steel beam repair and bridge painting. Funded 100% bond and 80 federal/20 state. 112604~|~1~|~1~|~01/ENH/LOWE~|~Improve and rehabilitate Stavich Trail and redeck a bridge in the Village of Lowellville. 110694~|~1~|~1~|~01/S<2~|~Construction Inspection 110694~|~1~|~2~|~02/S<2~|~Construction Inspection 110694~|~1~|~3~|~03/S>2~|~Balance FY2026-1 115864~|~1~|~1~|~01/SAE~|~pavement markings on Huron County roads. 111546~|~1~|~1~|~01/MPO~|~TMACOG CMAQ Funded items 98860~|~1~|~1~|~01/S<2~|~Construct a three-legged roundabout at N. Bechtle Avenue and St. Paris connector. 96512~|~1~|~1~|~01/NFP~|~Pavement repairs on ATB-SR46, MAH-IR80, and STA-IR77. 111043~|~1~|~2~|~02/S>2/CAWD~|~Relocation of waterline. 111043~|~1~|~1~|~01/MPO/STCE~|~Adding TWLTL on Perry Street between Southway St and SR 172 and includes installing sidewalks and decorative light poles. 91310~|~1~|~1~|~01/NHS/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the NHS portion: on US 42 On US 42-Reading Road from the Norwood Lateral to Seymour: from SLM 6.99 to SLM 8.25. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 91310~|~1~|~2~|~02/NHS/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the NHS portion: on US 42 On US 42-Reading Road from the Norwood Lateral to Seymour: from SLM 6.99 to SLM 8.25. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 91310~|~1~|~4~|~04/S>2/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the Urban roadway portion: on SR 561 from Beechmont (SR32) to Observatory Ave.: from SLM 0.00 to SLM 1.83. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 91310~|~1~|~3~|~03/S>2/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the Urban roadway portion: on SR 561 from Beechmont (SR32) to Observatory Ave.: from SLM 0.00 to SLM 1.83. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 88703~|~1~|~2~|~02/MPO~|~100% Local items. 88703~|~1~|~1~|~01/MPO~|~Resurfacing and widening 91344~|~1~|~1~|~01/S<2~|~General system resurfacing of PIC-752 within Ashville S Bloomfield urban area. SLM 1.82-2.32 91344~|~1~|~2~|~02/STR~|~General system resurfacing of SR-752 in rural area. SLM 2.32-8.43 110834~|~1~|~1~|~01/SAE~|~Safety funding split 118614~|~1~|~1~|~01/NHS~|~plan split. 93505~|~1~|~1~|~01/MPO~|~Plane, pave, replace guardrail and apply pavement markings on MED CR 17 (West 130th) from 0.00 to 5.59. 93505~|~1~|~2~|~02/MPO~|~100% local items. 109316~|~1~|~1~|~01/STR~|~CEAO funded bridge rehab of McLean Mill Rd over Big Darby Creek 87689~|~1~|~1~|~01/NHS~|~Preventive Maintenance - District Allocation - 80/20 118787~|~1~|~1~|~01/NHS~|~Fine Grade Polymer Modified Asphalt Concrete Overlay (Smoothseal) 108704~|~1~|~1~|~01/SAF~|~Signal replacements using 95% Small City funds (4B97) and 5% Local funds (LNTP). 109006~|~1~|~1~|~01/ENH~|~Construct sidewalks, curb and curb ramps 95% TAP funding. 99660~|~1~|~1~|~01/NFP~|~SFNs 4805909, 4805917, 6201628 96687~|~1~|~1~|~01/NHS~|~Plan split for all pavement in the project between SLM 11.30 - 15.59 on HAM-126. This will include all mainline and ramp work. 120724~|~1~|~1~|~01/BRO~|~Plan Split 01/BROS 116675~|~1~|~1~|~01/STR~|~All work is in this split 89469~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Bridge replacement on CR 1 5.58 at existing line and grade. Project is 2.0 mi S of SR 150. 80259~|~1~|~1~|~01/STR~|~Concrete bridge deck overlay for WAS 339 2013, SFN 8404380. Rural other federal aid funded 80 federal/20 state. 96529~|~1~|~1~|~01/S>2~|~Generic Plan Split for traffic signal inspection in District 8 88522~|~1~|~2~|~02/STR~|~Structure work shall include the removal of the wearing course, replacement of the waterproofing, polymer modified asphalt joints and overlaying with asphalt. 88522~|~1~|~1~|~01/STR~|~Resurfacing the existing roadway on USR 36 from (SLM 17.20) the West Corporation Limit of Fletcher to the Miami/Champaign County Line (SLM 22.02) and on State Route 589 from State Route 55 in Casstown (SLM 0.05) to US Route 36 in Fletcher (SLM 6.47). 118645~|~1~|~1~|~01/S>2~|~Replace sodium light fixtures with LED lights 88893~|~1~|~2~|~02/IMS~|~See linked structure. 88893~|~1~|~3~|~03/NHS~|~Resurfacing of POR SR 43 0.00 to 7.47 and 8.15 to 8.50 88893~|~1~|~1~|~01/NHS~|~See linked structure. 93316~|~1~|~1~|~01/SAF~|~Safety and local Marion County funding for new roadway (Univ Dr) from SR-529/CR-169 to SR-95/Univ Dr intersection 93316~|~1~|~3~|~03/S<2/MAR~|~100% local funding for Campus Access signal 93316~|~1~|~2~|~02/ENH~|~80% Enh & 20% Marion County for Enhancements:- lighting, walk, curbs, landscape mounding, plantings, aesthetic upgrades for mast arms all on new section of Univ Dr 94399~|~1~|~1~|~01/STR~|~Resurfacing:MED-162-0.00 to 2.97MED-301 6.91 to 8.61 94399~|~1~|~2~|~02/STR~|~MED-SR-301 07.000 SFN 5207533 (OVER COON CREEK) - Deck Sealing 94399~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 119766~|~1~|~1~|~01/S5K~|~All work included in this split. 103739~|~1~|~1~|~01/SAF~|~Plan Split 119863~|~1~|~1~|~01/S5K~|~All Work Included in this Split 98552~|~1~|~1~|~01/STR~|~All work is in this split. Funding is 80% federal; and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7. 109661~|~1~|~1~|~01/STR~|~Resurfacing HAS-646 117552~|~1~|~1~|~01/S50~|~To provide turn lanes on SR 43 at the intersection of SR 43 and CR 43 (Ross Ridge Rd.) 90351~|~1~|~1~|~01/STR~|~Culvert Replacement 124144~|~1~|~1~|~01/NFP~|~Culvert replacements. 84634~|~1~|~1~|~01/STR~|~HIG SR124 17.82 - 25.92HIG SR41 1.13-1.88 99453~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. 114621~|~1~|~1~|~01/NHS~|~Overlay on PIK 32. 116165~|~1~|~1~|~01/STR~|~Landslide repair. ATH 144 12.08. 93717~|~1~|~1~|~01/NFA~|~R/R Xing - Geometric Improvements 110348~|~1~|~1~|~01/MPO~|~Intersection upgrade by removing the concrete island, realigning the crosswalks on the northwest corner, new pedestrian push buttons, upgraded truncated domes to the current standard, resurfacing of the intersection pavement and a signal detection conversion to a non-intrusive detecting system. 122882~|~1~|~1~|~01/NFP~|~All work included in this plan split. 106620~|~1~|~1~|~01/NHS~|~Addition of a left turn lane on WAS 7 18.00. Funded 80 federal/20 state. 97587~|~1~|~1~|~01/S<2~|~"01/S<2/OT/ " - Major/New 4BD7 (100% State) - No CAP - Demolition of acquired structures for the Cherry Valley Interchange at: 1) Lic-CR 128-00.83; 2) Lic-CR 539-07.46; 97587~|~1~|~2~|~02/NHS~|~"02/NHS/OT/ " - Major/New 4BD7 (100% State) - No CAP - Tree Cutting on the project - $250,000.00 from PID 80704 and $250,000.00 from other TRAC Funding 117458~|~1~|~1~|~01/BRF~|~Bridge rehabilitation (SFN 5930324) 96376~|~1~|~1~|~01/NFA~|~ District Preservation 4PS7(100% State) - No CAP - Bridge rehabilitation on 6402283 PER-204-9.42 Intersect: Over Johnathan Creek; Not BR Eligible: Length=132 SD/FO(0) SR=86.6 DSR=5 111581~|~1~|~1~|~01/STR~|~Resurfacing of 6 county routes in Mahoning County. 111581~|~1~|~2~|~02/NFA~|~Resurfacing of MAH CR 59 Helsel Rd from 0.00 (Center St) to 0.05 (SR 14). 95773~|~1~|~1~|~01/STR~|~Fropm SLM 16.18 to SLM 20.24 82830~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 329 14.60-19.65, and MRG 329 0.00-3.79. Rural other federal aid using 80 federal/20 state funds. 110852~|~1~|~1~|~01/SAF~|~Split for 90% safety/10% local funding 119991~|~1~|~1~|~01/BRF/BCEO~|~CEAO local bridge funded design build bridge replacement for BCEO. Detailed design and construction 100% CEAO funded. 113258~|~1~|~1~|~01/MPO~|~Split for MPO funded eligible work. 110808~|~1~|~1~|~01/NHS~|~Slide Repair. 122785~|~1~|~1~|~01/SAF~|~Intersection safety improvements 112719~|~1~|~1~|~01/NHS~|~Bridge repair of various locations throughout district 6 101315~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for all of the routes within this project (all STP Rural routes) 101315~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for all routes within this project (all STP Rural routes) 109135~|~1~|~1~|~01/STR~|~Construct sidewalks along Grove St and Graham St 111079~|~1~|~1~|~01/NFP~|~Plan split for Federal/State exchange funds for bridge 119965~|~1~|~1~|~01/CMQ~|~Replace existing high pressure sodium lighting fixtures with LED fixtures for the street lights along E Second streeet (SR 835) from Beavercreek west corp line to N. Fairfield Rd. 107477~|~1~|~1~|~01/NHS~|~Resurfacing: LOR 0006 15.87 to 21.23 FED/LOCAL 80/20 107477~|~1~|~2~|~02/NHS~|~Resurfacing: Resurfacing: LOR 0006 15.87 to 21.23 Local 100% 109878~|~1~|~1~|~01/STR~|~Test 91756~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. NOB 564 0.04-13.48. Not on any federal aid system funded 100% state. 91756~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. MOE 145 0.00-8.50. Rural other federal aid funded 80 federal/20 state. 103743~|~1~|~1~|~01/SAF~|~This plan split covers the entire cost of the project, which will be to demolish a structure or a portion of a structure to improve sight distance at the intersection of SR-732 & Stillwell Beckett 103172~|~1~|~1~|~01/CMQ/GREE~|~Construction of roundabout on State Route 241 (Massillon Road) at Corporate Woods Circle, in the City of Green, Summit County, Ohio. 103172~|~2~|~2~|~02/CMQ/GREE~|~Construction of roundabout on State Route 241 (Massillon Road) at Boettler Rd/Franks Parkway, in the City of Green, Summit County, Ohio. 100186~|~1~|~1~|~01/S<2~|~CLE SR 131 SLM 22.4 to 22.66 Project to relocate a ditch encroaching the pavement on SR 132 in Clermont County between Parker and Heritage. 110984~|~1~|~1~|~01/BRF~|~Bridge Replacement. 87273~|~1~|~2~|~02/IMS~|~See linked structures >20' span. 87273~|~1~|~1~|~01/IMS~|~Resurfacing MAH IR 680 from 7.05 to 12.00 87273~|~1~|~3~|~03/NHS~|~See linked structures >20' span. 124974~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP Rural roadway 101395~|~1~|~1~|~01/STR~|~CLI SR 134 - Partial Depth Repair 2'x3" edge GRE SR 72 - Slot paving, 15% - 20% GRE SR 343 - Slot paving, 15% - 20% 101395~|~1~|~2~|~02/NHS~|~Turn lane work on US35 - NHS Route. 92156~|~1~|~1~|~01/IMS~|~100% State Preservation funds 120885~|~1~|~1~|~01/BRF~|~All work on CR 11J associated with the bridge replacement 97296~|~1~|~1~|~01/IMS~|~Building Demolition. 84285~|~1~|~2~|~02/S>2~|~80/20 state/local urban paving funding split in State STP for the section to be resurfaced within the City of Garfield Hts. For this project, the funding will be 100% state. 84285~|~1~|~3~|~03/S>2~|~100% local funding for ADA compliant curb ramps and other non-urban paving eligible items. 84285~|~1~|~1~|~01/S>2~|~100% State STP for the section to be resurface within Village of Valley View. 87238~|~1~|~1~|~01/STR~|~HIG SR28 0.00 - 7.27 Resurfacing ProjectOn SR28, from the Clinton County line (SLM 0.00) east to the Leesburg corporation limits (SLM 7.27), it is proposed to resurface the highway with aspahalt concrete.Pave Thru Brdgs:600025 HIG SR28 1.99 Intersect: Branch Of Lees Creek3600076 HIG SR28 2.27 Intersect: Br Of Lees Creek3600238 HIG SR28 5.79 Intersect: Trib Of Middle Fk Lees Cr80/20 split01/STR/PV/State 87238~|~1~|~2~|~02/STR~|~HIG SR28 0.00 - 7.27 Resurfacing ProjectOn SR28, from the Clinton County line east to the Leesburg corporation limits. Brdgs for Rehab:3600092 HIG SR28 2.55 Intersect: Br Of Lees Creek3600114 HIG SR28 2.7 Intersect: South Fork Of Lees Creek3600157 HIG SR28 3.96 Intersect: South Fork Lees Creek3600181 HIG SR28 5.19 Intersect: South Fork Lees Creek08/20/splits02/STR/BR/State 107764~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacement on various routes throughout Mahoning, Portage, and Trumbull County. 100986~|~1~|~1~|~01/NHS~|~Emergency job to repair flood damage on JAC 35 (25.20). 94466~|~1~|~2~|~02/NFA~|~CRA-39-4.02-7.61 Chip Seal segment 94466~|~1~|~3~|~03/S<2~|~S<2: HUR-162-5.97-8.09 Chip Seal segment 94466~|~1~|~1~|~01/STR~|~CRA-598-5.10-8.95/9.20-11.00 Chip Seal segmentsHUR-162-0.00-5.97/8.09-8.94 Chip Seal segments 101071~|~1~|~1~|~01/STR~|~Overlay SR 274 in Logan County with a fine graded aggregate: LOG SR 274 SLM 4.81 to 10.30 = = LOG SR 274 SLM 15.78 to 22.64. 98559~|~1~|~1~|~01/STR~|~Plan Split for the resurfacing of the rural portion of SR 128. Location between SLM 6.72-10.75 98559~|~1~|~2~|~02/S>2~|~Plan split for resurfacing the Urban portion of SR 128. Limits are SLM 5.25-6.72 107949~|~1~|~1~|~01/NFP~|~D7 General construction inspection 124792~|~1~|~1~|~01/NFA~|~Filling in sidewalk gaps at 5 City of Columbus Elementary Schools, 3 new crosswalks at 1 Elementary School 113659~|~1~|~1~|~01/MPO~|~Resurfacing with pavement repair on Clearcreek-Franklin Road from SR 73 to the northern City of Springboro corp. limit. 122511~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes 96566~|~1~|~2~|~02/STR~|~100% Bonds capped at $567,009.89 96566~|~1~|~1~|~01/STR~|~STP 80/20 Resurfacing. Includes bridges. 96995~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/PV/LANC" - City of Lancaster project for improvements to Ewing Street utilizing ODOT MPO/Major City Funds. 87338~|~1~|~1~|~01/NHS~|~Resurfacing on US 22 106905~|~1~|~1~|~01/STR~|~Slide repair LAW 378 6.70 95408~|~1~|~1~|~01/NHS~|~Remove and replace LMC overlay with LMC overlay using hydrodemolition. Rebuild deck edges, and put in new expansion joint, rubber gland system. SFN 1902466 & SFN 1902490 over Greenville Creek. 97948~|~1~|~1~|~01/STR/GCEO~|~"01/STR/PV/GCEO" Guernsey Co. resurfacing approved CEAO federal funding cap $1,971,120 at 80% 97948~|~1~|~2~|~02/S<2/GCEO~|~"01/S<2/PV/GCEO" Guernsey County Engineer Minor Arterial - CEAO Max $1,971,120 104380~|~1~|~1~|~01/IMS~|~Split for pavement work on mainline I-271 91281~|~1~|~1~|~01/STR~|~BRO SR41 2.80 OH11-02On SR41, begin project 2.25 miles north of the Aberdeen corporation limit. BRO-002 CO CC 01 - added plan splits for slide repair (OH11-02)80/20 split01/STR/OT/State 115492~|~1~|~1~|~01/BRO~|~Split for Type A emergency bridge work 102527~|~1~|~1~|~01/IMS~|~This plan split is for the bridge repair due to bridge strike. 100792~|~1~|~1~|~01/IMS~|~Remove and replace existing barrier, replace existing guardrail with barrier, guardrail work.MOT IR 75 SLM 20.30 to 20.55MOT IR 75 SLM 16.20 to 16.26 100792~|~1~|~2~|~02/NHS~|~Remove and replace existing barrier, replace existing guardrail with barrier, guarrail work.MOT SR 4 18.40 to 18.44 100792~|~1~|~3~|~03/IMS~|~Bridge Painting on beam 102063~|~1~|~1~|~01/NFA~|~TID is constructing Hines Hill, project including, but not limited to roadwork improvements by widening a 3 and 4 lane road with turn lanes, traffic signal, and other safety improvements. 95322~|~1~|~3~|~03/NHS~|~4001605 JAC -SR -93 27.320 51.3 4001613 JAC -SR -93 27.320 51.0 Mill & Fill & new joints on both structures80/20 w/local match 95322~|~1~|~1~|~01/NHS~|~JAC SR93 25.79 - 28.18N P 781 NHS Non-Interstate Other Principal Arterial WELLSTON Urban Paving80% fed/20% local 95322~|~1~|~2~|~02/S<2~|~JAC SR93 24.46 - 25.79O M 781 Other Federal-Aide Highway Minor Arterial WELLSTON Urban Paving80%fed/20% local match 106123~|~1~|~1~|~01/S>2~|~Reconstruction in the City of Dayton on Salem Ave from Grand Ave to Superior Ave to include pavement, curb sidewalk, lights and catch basins. 109338~|~1~|~1~|~01/NFP~|~ODNR Maintenance Course Fog or Micro entire facility at East Harbor State Park 107019~|~1~|~1~|~01/SAF~|~Guardrail repair and upgrade in District 8 107019~|~1~|~2~|~02/SAF~|~Guardrail repair and upgrade in Montgomery County in D7 83444~|~1~|~1~|~01/STR~|~Roadway work 83444~|~1~|~2~|~02/BRO~|~Bridge Replacement 119949~|~1~|~1~|~01/STR~|~added plan split. 101128~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete: MIA US 36 SLM 13.46 to 17.20CHP SR 29 SLM 0.00 to 2.36 101128~|~1~|~2~|~02/S<2~|~Overlay US 36 in Miami County with asphalt concrete: MIA US SLM 12.60 to 13.46 99570~|~1~|~1~|~01/SAE~|~Installation of new and upgrade of existing guardrail on County routes within Ashland County. 91051~|~1~|~1~|~01/BRF~|~Bridge repair on DFN 7706871 over Cuyahoga River, RR and Bikepath 123555~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation repairs on interstate bridges at various location in Cuyahoga county 111497~|~1~|~1~|~01/SAF~|~Various ITS maintenance activities 111497~|~1~|~2~|~02/IMS~|~Install new cameras on IR 270 using TSMO funding. 90665~|~1~|~1~|~01/NHS~|~LUC-SR2-21.24 to 22.51 116999~|~1~|~1~|~01/NFA~|~Created for J&C involvement 94251~|~2~|~2~|~02/STR~|~Resurfacing in Defiance County designed with PID 107697 to be sold as Part 2. Funding is district preservation funds (80% 4PF7 and 20% 4PS7). No local funds 94251~|~1~|~1~|~01/NHS~|~Resurfacing work on US 30 in Allen County. District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap 94251~|~2~|~3~|~03/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds. Designed with PID 107697 94251~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 115458~|~1~|~1~|~01/SAF~|~SRTS funds for sidewalk installation 102902~|~1~|~1~|~01/NHS~|~SEN-224 102902~|~1~|~2~|~02/STR~|~Rural 123813~|~1~|~1~|~01/S>2~|~Urban Paving plan split 123813~|~1~|~2~|~02/NFP~|~100% Locally funded plan split for repairs, curbs, ramps. 95271~|~1~|~1~|~01/NHS~|~Culvert Replacement ADA SR32 9.92N P 000 NHS Non-Interstate Other Principal Arterial RURAL 80/20 split 94458~|~1~|~1~|~01/NFP~|~Epoxy pavement markings on STA-US30 and STA/SUM-IR77 in Stark and Summit Counties, Ohio. 94474~|~1~|~1~|~01/NFP~|~Annual lighting maintenance contract district wide. 119994~|~1~|~1~|~01/NHS~|~Smoothseal WAY-30-19.469 to 26.467 97220~|~1~|~1~|~01/BRF~|~Construction engineering consultants for OBPP. 116357~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 43 over Branch of Goose Creek. In stream work will be required. 101101~|~1~|~1~|~01/BRF~|~CEAO funded bridge replacement 114406~|~1~|~1~|~01/S<2/LANC~|~"01/S>2/PV/LCAN" - resurfacing and related work on Sixth Avenue. 80% Federal (4TA7) and 5% Local (LNTP) - 15% TRC added 05-16-22. 83910~|~1~|~1~|~01/STR~|~Resurface the existing roadway along with other roadway related items in North Lewisburg on State Route 245 from the South Corporation Limit SLM 21.61 to the Champaign/Union County Line SLM 22.54 83910~|~1~|~2~|~02/NFA~|~Resurface the existing roadway along with other roadway related items on State Route 559 from SLM 3.52 to 3.55. 101251~|~1~|~1~|~01/NFA~|~PLan Split for all ODOT paid for work on roadwasy, sidewalks, curbs, ramps, and drainage 101251~|~1~|~3~|~03/NFA~|~Plan Split for all work paid for by CSU 101251~|~1~|~2~|~02/NFA~|~Pedestrian crossing upgrades to be installed at 100% Safety funds. 89330~|~1~|~1~|~01/STR/ADA~|~Harshaville Covered Bridge in Adams CountyProject is 1.343 miles south east from SR247. Project Description: It is proposed, on the Harshaville Covered Bridge in Adams County, to install new siding & roofing, repair the existing roofing support system, apply fire retardant, replace existing back wall, improve lateral bracing, elevate the structure, replace the wood deck, add new guardrail, and replace the old steel beams with new painted steel beams. 118742~|~1~|~1~|~01/IMS~|~Concrete Pavement Repairs on I-70 121503~|~1~|~1~|~01/NHS~|~Repair bridge carrying SR 7 over Norfolk Southern railroad. 119370~|~1~|~1~|~01/SAF~|~Reconstruct about 1 mile of Second Creek Rd, improving vertical and horizontal curves as well as widening the pavement and berms and removing fixed objects from the clear zone. 112591~|~1~|~1~|~01/STR~|~Rural Portion of SR 736 - SLM 0 to 7.55 112591~|~1~|~2~|~02/S<2~|~Resurface SR 736 from SLM 7.55 to 7.95 121258~|~1~|~1~|~01/NFP~|~added HS plan split. 121350~|~1~|~1~|~01/NHS~|~Plan split for work on SR-2 and Ramp from SR-2 to SR-269 121350~|~1~|~2~|~02/STR~|~Plan split for work on SR-269 103754~|~1~|~1~|~01/SAF~|~Improve ramp capacity on IR 75 at Tylersville Road - BCEO. 117199~|~1~|~1~|~01/SAF~|~Plan split for PHB locations, with 90% HJ7 funding. 117199~|~1~|~2~|~02/SAF~|~Plan Split for RRFB locations funded by 90% 4HJ7 + 10% 4BC7. 98343~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on NHS routes in District 5. 98343~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5. 98343~|~1~|~3~|~03/IMS~|~District Preservation 4PF7 (90% Federal)/4PS7 (10% State) - No CAP - Full Depth Repairs, Concrete Patching on Interstate in District 5. 108890~|~1~|~1~|~01/BRF~|~Bridge Replacement 88252~|~1~|~1~|~01/IMS~|~LUC IR475 8.8-9.54 88252~|~1~|~2~|~02/IMS~|~4800605 LUC US20 9.54 Intersect: Ir 475 88252~|~1~|~3~|~03/NFP~|~Construction Requested Split for new Part Code: The contractor hit a sanitary line maintained by the Lucas County Sanitary Department that was mismarked. The Lucas County Sanitary Department agreed to reimburse The Department/Contractor for performing the necessary work to fix the sanitary line. 85582~|~1~|~1~|~01/NFP~|~District Maintenance/Preservation Project - 4CP7/4PS7 (100% State) -District wide Ash Tree removal project 96691~|~1~|~1~|~01/IMS~|~AC Overlay with Repairs on:HAM-71 SLM 16.66 to 17.84HAM-71 SLM 17.84 to 19.91Some ramps to be included in the project. 96691~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 93574~|~1~|~1~|~01/MPO~|~100% City of Huron items 93574~|~1~|~2~|~02/MPO~|~Realign and resurface Main Street including streetscape components. Portions of Main Street are on the Federal Aid System and eligible for federal funding. 121939~|~1~|~1~|~01/BRO~|~Plan split for damage repair on LUC-2-2124 bridge. 90385~|~1~|~3~|~03/S>2/ETNA~|~"03/S>2/OT/ETNA" - City of Reynoldsburg Funded through Etna Township - 4BG7 (100% Local) - No CAP - Relocation of City of Reynoldsburg Water & Sewer lines outside of the City Corporation Lines 90385~|~1~|~5~|~05/CMQ/ETNA~|~"05/CMQ/OT/ETNA" - MORPC CMAQ Funds - 4TB7(80% Federal)/ 4BG5 (OPWC)/4BG7 (20% local) - MORPC CAP is $29,668.30 and OPWC CAP is $9,921.10- Roadway reconstrucion for extention of storm sewer down township roadway to stream. (TR219) Etna Township holds the contract for Violet Township 90385~|~1~|~2~|~02/CMQ/ETNA~|~"02/CMQ/OT/ETNA" - MORPC CMAQ Funded - 4TB7 (80% Federal) / 4BG6 (OPWC)/4BG7 (20% Local) - MORPC CAP $356,019.58 for Construction Phase and OPWC CAP of $99,211.00 - Roadway reconstruction and addition of sidewalks in Reynoldsburg on: 1) Lic-TR 169-4.60 to 4.79; 2) Lic-TR 169-5.33 to 5.35; 3) Lic-TR 169-5.50 to 5.57; 90385~|~1~|~1~|~01/CMQ/ETNA~|~"01/CMQ/OT/ETNA" - MORPC CMAQ Funded - 4TB7 (80% Federal) / 4BG6 (OPWC)/4BG7 (20% Local) - MORPC CAP $2,581,141.93 for Construction Phase and OPWC CAP $882,977.90 - Roadway reconstruction and addition of sidewalks on: 1) Lic-TR 169-4.79 to 5.33; 2) Lic-TR 169-5.53 to 5.50; Additionally, add a new signal at Taylor & Palmer Roads *** NOTE: "CO CC 1 PE Payback" is capped at $240.131.61 *** 90385~|~1~|~4~|~04/S>2/SWLC~|~"04/S>2/OT/SWLC" - South West Licking County Water & Sewer Funded - 4BG6 (OPWC)/4BG7 (100% Local) - CAP 4BG6 (CQ35R/CQ36R) of $280,590.00 paid at 50%/50% - Installation of South West Licking County Water & Sewer lines 124238~|~1~|~1~|~01/IMS~|~Plan split for roadway work 95922~|~1~|~2~|~02/NHS~|~Resurfacing and related bridge maintenance work outside of city of Newark 95922~|~1~|~1~|~01/NHS/NEWK~|~Resurfacing work within city of Newark 95922~|~1~|~3~|~03/NHS/NEWK~|~Resurfacing work within city of Newark 114878~|~1~|~1~|~01/NFP~|~Created for J&C involvement 113978~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 38.47 (SFN 5302919) and 38.48 (SFN 5302943). 104685~|~1~|~1~|~01/NFA~|~PIK CR VAR PM FY22 102180~|~1~|~1~|~01/NFP~|~Construction of the new garage facility for Geauga County. 105885~|~1~|~1~|~01/ENH~|~Construction of bike/ped shred use path along SR 7 from North 4th Street to LaBelle - 80% TAP/20% Local. 112543~|~1~|~1~|~01/MPO~|~AMATS funded resurfacing 103258~|~1~|~1~|~01/STR~|~Overlay on rural routes: CHP SR 559 SLM 0.84 to 7.89 105642~|~1~|~1~|~01/NHS~|~AC overlays with repairs on NHS route. 96772~|~1~|~1~|~01/STR~|~Two-lane resurfacing project on WAS CR 25 1.15-7.73. Includes striping, spot base repair and minor guardrail reconstruction and repair. Funded 80 federal/20 local. 105366~|~1~|~1~|~01/NHS~|~Smooth seal on NHS routes: MOT SR 4 SLM 4.49 to 7.13 & SLM 8.13 to 11.88. 112692~|~1~|~1~|~01/NHS~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items): 112692~|~1~|~2~|~02/NHS~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.): 103952~|~1~|~1~|~01/NHS~|~SFNs 6200729 & 6200753 112827~|~1~|~1~|~01/STR~|~Resurfacing SR 39 109233~|~1~|~1~|~01/NFP~|~2019 Operations Chip Seal 102333~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads in Miami County. 102637~|~1~|~1~|~01/STR~|~Bridge Replacement: HUR-162-17.42 (SFN 3903060) 105102~|~1~|~1~|~01/STR~|~PIK 776 0.50 (SFN 6603335) replacement 121235~|~1~|~1~|~01/STR~|~Plan split for chip seals 116584~|~1~|~1~|~01/S5K~|~Marion Urban Area plan split for resurfacing and resurfacing related items. 116584~|~1~|~2~|~02/STR~|~Rural plan split - covers resurfacing and resurfacing related items on the rural portions of MAR-95. 116584~|~1~|~3~|~03/STR~|~Work on three structures 97569~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-TR 8-0002 (SFN: 0933910) in Butler County, and Bridge No. CLE-TR 960-0010 (SFN: 1331957) in Clermont County. 97645~|~1~|~1~|~01/BRF~|~SFN 8633916 116392~|~1~|~1~|~01/NHS~|~TUS-250 resurfacing 116392~|~1~|~2~|~02/S<2~|~TUS-36 resurfacing 123763~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance work 93725~|~1~|~1~|~01/SAE~|~Installation of a new traffic signal at the intersection of the WB exit ramp and Brookville Arlington Road. 95946~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority 110743~|~1~|~3~|~03/NHS~|~Resurfacing in the Village of Silver Lake. 110743~|~1~|~5~|~05/NHS/STOW~|~Resurfacing, urban paving in the City of Stow. 110743~|~1~|~6~|~06/MPO/STOW~|~ADA curb ramp reconstruction, full and partial depth repairs in the City of Stow. 110743~|~1~|~4~|~04/NHS/SLAK~|~Full and partial depth repairs and drainage/catch basin repairs in the Village of Silver Lake. 110743~|~1~|~2~|~02/NFP/CUYF~|~Full and partial depth repairs, ADA curb ramp reconstruction and paving on adjacent local streets. 110743~|~1~|~1~|~01/NHS/CUYF~|~Resurfacing, urban paving in the City of Cuyahoga Falls, includes alternate bid for proprietary video detection system at Front St and Bailey Rd and Front St and Hudson Dr, in the City of Cuyahoga Falls. 88669~|~1~|~1~|~01/S<2~|~Crack Sealing on the General System for FY2016 122503~|~1~|~1~|~01/NHS~|~Deck replacement project on MOE SR 7 2148 (SFN 5600669). Work also includes superstructure repair. Funded 80% Federal/20% State. 112829~|~1~|~1~|~01/STR~|~Resurfacing SR 172 121891~|~1~|~1~|~01/NFP~|~Pavement Reactive Maintenance ERI-250 and LOR-303 115104~|~1~|~1~|~01/NHS~|~Rock fall maintenance by barrier installation. 123804~|~1~|~1~|~01/S>2~|~stp 123804~|~1~|~2~|~02/STR~|~stp rural 106539~|~1~|~2~|~02/ENH/BARB~|~Construct shared use path on Wooster Rd from 4th St NW to 2nd St SW in the City of Barberton. 106539~|~1~|~1~|~01/SAF/BARB~|~Intersection improvement at Wooster Road/Robinson Avenue area, in the City of Barberton, Summit County, Ohio. 109484~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 107023~|~1~|~1~|~01/IMS~|~Plan Split 112305~|~1~|~1~|~01/BRF~|~Bridge replacement on County Road 49 0.19; 80% 4C87/20% LNTP. 113949~|~1~|~1~|~01/SAF~|~Remove median pavement on Alum Cr Dr at Bixby Rd 109322~|~1~|~1~|~01/STR~|~Slide Repair DSR# LAW-002LAW CR 2 0.97 112847~|~1~|~2~|~02/STR~|~Bridge Plan Split 112847~|~1~|~1~|~01/STR~|~Rural Plan Split on MAR-309, MRW-309 and MRW-61. 94257~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Installation of turn lanes and signal on Per-SR 13-32.45 to 32.65 94257~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Realignment of Per-TR 37-01.04 to 01.06 117321~|~1~|~1~|~01/ENH~|~Sidewalk reconstruction and street light upgrades on Main Street in the City of Logan. Total length of work 0.39 miles. TAP funded. Funded 95% Federal/5% Local. 121365~|~1~|~1~|~01/BRO~|~Rehabilitate bridge carrying SR 170 over North Fork Little Beaver Creek. 85288~|~1~|~1~|~01/SAF~|~LUC-475 from SLM 4.51 to SLM 4.75 120740~|~1~|~1~|~01/BRO~|~Repair bridge carrying US 40 over Wheeling Creek, CR-10 and Abandoned Railroad. 113027~|~1~|~1~|~01/IMS~|~Split for pavement work 108556~|~1~|~1~|~01/BRO~|~Remove asphalt wearing surface, replace deck slab edges and place new rigid concrete overlay on twin continuous concrete slab structures COL-14 T-0054 L&R (SFNs 1501364 and 150372). Encase pier piling. 84577~|~1~|~1~|~01/BRO~|~The split is for work eligible for the use of federal BR funds. 77537~|~1~|~1~|~01/NHS~|~Resurfacing 77537~|~1~|~2~|~02/NHS~|~Bridge work to be determined 77537~|~1~|~3~|~03/SAF~|~Split 3/1 is additional costs for wet reflective optics and Grooving (100% 4HJ7) and split 3/2 to cover the remaining pavement marking costs (4PF7/4PS7) 100298~|~1~|~2~|~02/S<2~|~Microsurfacing of MAH SR 14 8.02 to 9.02. 100298~|~1~|~3~|~03/S<2/SALE~|~Microsurfacing of MAH SR 14 from 7.92 to 8.02, Urban Paving in the City of Salem. 100298~|~1~|~1~|~01/STR~|~Microsurfacing of MAH SR 14 0.00 to 7.92, POR SR 44 24.19 to 26.76, POR SR 82 5.06 to 9.13, POR SR 225 0.00 to 2.53 108311~|~1~|~1~|~01/IMS~|~OH18-01 ER event. Landslide repair on NOB 77 7.90, DSR NOB-004. Funded 100% federal. 108311~|~1~|~2~|~02/STR~|~OH18-01 ER event. Landslide repair on NOB 145 8.80, DSR NOB-001. Funded 100% federal. 108311~|~1~|~3~|~03/NHS~|~OH18-01 ER Event. Landslide repair on WAS 50 4.30, DSR WAS-003. Funded 100% federal. 108311~|~1~|~6~|~06/STR~|~OH18-01 ER Event. Landslide repair on WAS 821 10.22, DSR WAS-006. Funded 100% federal. 108311~|~1~|~7~|~07/IMS~|~OH18-01 ER event. Landslide repair on WAS 77 15.37 NB, DSR WAS-008. Funded 100% federal. 108311~|~1~|~4~|~04/STR~|~OH18-01 ER Event. Landslide repair on WAS 550 3.98-3.995, DSR WAS-005. Funded 100% federal. 108311~|~1~|~5~|~05/STR~|~Landslide repair on WAS 550 3.995-4.01. Funded 80 federal/20 state non-ER funds. 85358~|~1~|~1~|~01/NHS~|~80/20 state/local funding split for the urban paving eligible portion of the project. 85358~|~1~|~2~|~02/NHS~|~100% local funding split. 95507~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Kno-SR 229-11.12 to 25.38; 2) Cos-SR 229-00.00 to 00.70; 95507~|~1~|~2~|~02/S<2/MTVN~|~"02/S<2/PV/MTVN " - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing on Kno-SR 229-09.51 to 11.12 86941~|~1~|~4~|~04/NHS/WARR~|~80/20 Urban Paving work on US-422 from Ridge Road to North Road, in the City of Warren, Trumbull County, Ohio. 86941~|~1~|~2~|~02/S>2~|~Plan Split for SFN 7807074 TRU US 422 12.85 under Bike Trail 86941~|~1~|~3~|~03/S>2~|~Resurfacing of TRU SR-169 from 1.87 to 3.41 in Howland and Weathersfield Townships, Trumbull County, Ohio. 86941~|~1~|~1~|~01/BRO~|~Plan Split for BR Eligible SFN 7807066 TRU US 422 12.55 over Norfolk Southen RR 86941~|~1~|~5~|~05/NHS/WARR~|~100% City Items on US-422 from SR-169 to Laird Ave and Ridge Road to North Road, in the City of Warren, Trumbull County, Ohio. 88206~|~1~|~1~|~01/NHS~|~On US 27 from 4.22 to 4.27 (Near Kirchling) Stabilize Indian Creek along US27 that is meandering/eroding towards US27. 97654~|~1~|~1~|~01/NFP~|~Construct new Washington County Full Service Facility. Funded 100% state. 87209~|~1~|~1~|~01/S>2~|~US 42: From 0.92mi to 0.88mi south of SR 741 intersection. Replace bridge WAR-42-0348 SFN 8300488 over a tributary to Muddy Creek in Mason. The existing bridge is a 4 sided CIP box with a span of 15'. 87209~|~1~|~2~|~02/S>2~|~Replace bridge WAR-42-0348 over a tributary to Muddy Creek in Mason. The existing bridge is a 4 sided CIP box with a span of 15'. SFN 8300488. This Plan Split is for the GCWW work included in the project. 105750~|~1~|~1~|~01/NHS~|~WAY-30-11.79 to 19.45 Concrete repairs in EB Concrete Lanes Only. 105750~|~1~|~2~|~02/NHS~|~Deck Sealing on 3 mainline bridges as part of concrete repair project 107778~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 260 6.80-6.95. Minor Collector Route. Funded 100% state. 116966~|~1~|~1~|~01/S>2~|~Reconstruction including road diet from 5-lanes to 3-lanes 107644~|~1~|~1~|~01/STR~|~SCI 335 10.31 (SFN 7305109) 121441~|~1~|~1~|~01/SAF~|~General Guardrail System FY 2030 86998~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. MEG 124 47.36-62.33. Rural other federal aid funded 80 federal/20 state. 118796~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in MOE County. Funded 100% Federal. 94173~|~1~|~1~|~01/NHS~|~Repair existing CMP access tunnel JEF-7-0349 (SFN 4100131) by replacing the existing asphalt paved invert with a reinforced concrete paved invert. 121180~|~1~|~1~|~01/STR~|~Horizontal and vertical curve correction. HOC 664 13.03. 108598~|~1~|~1~|~01/NFP~|~The CITY will construct a new access road from the existing curb cut on SR-235 E. Xenia Drive to the north approx. 766 linear feet and terminating in a cul-de-sac or other appropriate configuration. 105042~|~1~|~1~|~01/BRF~|~Bridge replacement Elizabeth St over Norfolk Southern in East Liverpool with 80% Municipal Bridge/15% TRC/5% Local funds. 99065~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 4 lane - MIA/SHE/AUG/MER/DAR/LOG. 116981~|~1~|~1~|~01/S>2~|~Split for bridge retaining wall work 101989~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark, and Summit Counties. 113025~|~1~|~1~|~01/NFP~|~All work is in this split using 100% state funds from the District Preservation Program SAC 4PS7. 96874~|~1~|~1~|~01/NFP~|~District wide pavement marking plan for long line markings for FY 18. 95842~|~1~|~1~|~01/S<2~|~Roadway reconstruction including curb, sidewalk, concrete base, asphalt pavement, storm sewer, street lighting, landscaping and street amentities at Springfield Street from East Third Street to Findley Street. 120754~|~1~|~1~|~01/MPO~|~Work for multi-use path construction using NOACA Transportation Alternative Funding 120754~|~1~|~2~|~02/ERD~|~Construction of multi-use path with Earmark OH 430 funding 101645~|~1~|~1~|~01/STR~|~Culvert Replacement: CRA-103-12.35 91103~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 79580~|~1~|~1~|~01/IMS~|~Split for structures eligible for BR funding: 1807986, 1808044 79580~|~1~|~2~|~02/IMS~|~Split for structures not eligible for BR funding: 1807927, 1807951 113065~|~1~|~1~|~01/S>2~|~AC overlay with repairs on: HAM SR 264 SLM 0.00 to 1.08 117215~|~1~|~1~|~01/SAF~|~Lighting at MED IR 0076 and SR 0261. 89275~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 97730~|~1~|~1~|~01/NFA~|~Widening the turn lane in front of the expanding facility on Tussing Road. 124148~|~1~|~1~|~01/NFP~|~Created for J&C involvement 95655~|~1~|~1~|~01/NFP~|~Remove fuel storage tanks 92820~|~1~|~2~|~02/BRO~|~Waterline relocation at the City's expense in conjunction with the project. 92820~|~1~|~1~|~01/BRO~|~Remove and replace 3 span continuous concrete slab deck bridge with minimal approach work. NOTE: Sidewalks are box beams on outside of structure, not attached excep at abutment. SFN 8709601 MOT SR 202 7.00 115494~|~1~|~1~|~01/NFP~|~District wide crack sealing. 99410~|~1~|~1~|~01/BRO~|~See linked structures > 20' 99410~|~1~|~2~|~02/STR~|~See linked structure between 10' to 20'. 109564~|~1~|~1~|~01/SAF~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11. 94427~|~1~|~1~|~01/STR~|~Two Lane Resurfacing on Federal Aid System 94427~|~1~|~2~|~02/NFA~|~Two Lane Resurfacing Not on Federal Aid System (WAY-604-4.17 to 7.56) 101767~|~1~|~1~|~01/BRO~|~Replace existing bridge carrying SR 800 over Muskrat Run with new structure. 114907~|~1~|~1~|~01/STR~|~Pave culvert invert on WAS 339 6.66, CFN 1885599. 114907~|~1~|~2~|~02/IMS~|~Pave culvert invert on NOB 77 12.91, CFN 1875681. 123956~|~1~|~1~|~01/NHS~|~geotech plan split. 112277~|~1~|~1~|~01/STR~|~Bridge replacement project. WAS 339 8.64, SFN 8404143. Rural other federal aid funded 80 Federal/20 State. 98695~|~1~|~3~|~03/NFP~|~100% Local Items 98695~|~1~|~2~|~02/TRN~|~Extend the GCRTA rapid station platform. 98695~|~1~|~1~|~01/S>2~|~Construction of Section 2A from East 93rd Street to Quebec Ave 95116~|~1~|~1~|~01/NFA~|~Roadway width will be widened to include two 11' lanes and paving the shoulder on each side. Improvements will include drainage, guardrail, signage, resurfacing and pavement marking. Total lenth of project 0.35 miles at the intersection of Millcreek Rd (Twp 342) and Colegate Drive. Funded 100% federal. 100080~|~1~|~1~|~01/STR~|~Bridge Repairs:MED-IR-271 01.460 SFN 5207177 OVER MED-271 -0149L Preventive Maintenance ? Slope repair & protection install (082) MED-IR-271 01.480 SFN 5207193 OVER MED-271 -0157R Preventive Maintenance ? Slope repair & protection install (082) MED-IR-271 05.260 SFN 5207320 OVER MED-271 -0526 Preventive Maintenance ? Slope repair & protection install (082) MED-IR-271 05.900 SFN 5207266 TRIB.OF E.BR.ROCKY RIVER Preventive Maintenance ? Scour prevention and correction (083) Minor Rehabilitation ? Culvert invert repair (120) 103511~|~1~|~1~|~01/NHS~|~DSR HAS-001 89057~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO Enhancment funds. 122126~|~1~|~1~|~01/NHS~|~Slide repair. 116326~|~1~|~1~|~01/NHS~|~Plan Split for resurfacing on GRE-844 105862~|~1~|~1~|~01/IMS~|~Added plan split 105529~|~1~|~2~|~02/S<2~|~London urban paving plan split: MAD-142-2.40-2.94 105529~|~1~|~1~|~01/STR~|~Rural plan split for MAD-142-2.94 to 10.14 109643~|~1~|~1~|~01/S>2~|~The CITY will construct improvements to Reed Hartman Highway including but not limited to adding a northbound lane from P&G Drive to the Kemper drop lane, upgrading intersections at P&G Drive and a north access drive, upgrading the intersection of Cornell Rd. and Williamson, and other public improvements as recommended by a Traffic Impact Study to be completed 114518~|~1~|~1~|~01/S<2~|~Bridge replacement. 121863~|~1~|~1~|~01/MPO/CUYF~|~Pavement reconstruction. 102734~|~1~|~1~|~01/S5K/ALLI~|~Resurfacing, in the City of Alliance. 102734~|~1~|~2~|~02/S5K/ALLI~|~100% local items including ADA curb ramps and full and partial depth repairs. 122038~|~1~|~1~|~01/NHS~|~Remove orphan railroad bridge superstructure 97989~|~1~|~2~|~02/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-US 22-19.78 to 26.62 97989~|~1~|~1~|~01/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-US 22-18.14 to 19.78 93783~|~1~|~1~|~01/S<2/ADA~|~01/S<2/PV/ ; HAR-Ada Klingler Rd., 80% Fed (4B97) - 20% Local (LNTP). 93783~|~1~|~2~|~02/NFP/ADA~|~Work not eligible to be funded by the Small Cities Program. All funds provided by the Village of Ada. Water line work including water main, gate valve and fire hydrant. 117046~|~1~|~1~|~01/STR~|~All work in this project. 112419~|~1~|~1~|~01/IMS~|~Fine poly AC overlay 101254~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - District Wide Guardrail Ding N Dent 123630~|~1~|~1~|~01/IMS~|~Plan Split for Interstate 103812~|~1~|~1~|~01/BRF~|~Replacement of SFN4930649 102755~|~1~|~1~|~01/S>2/WARR~|~Concrete pavement repair of TRU US 422 from 12.42 to 13.03, urban paving in the city of Warren. 102755~|~1~|~2~|~02/S>2~|~Minor bridge work span > 20'. 88805~|~1~|~1~|~01/STR~|~District Allocation 120667~|~1~|~1~|~01/MPO~|~Split for MPO eligible resurfacing items 94681~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split using MPO STP funds to resurface Van Aken Boulevard. 93682~|~1~|~1~|~01/STR~|~Replace existing culvert on SR-269 in Ottawa County near R-163. CFN -1836409 97515~|~1~|~1~|~01/NFA/MCEO~|~"01/NFA/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 31-W292(Rural Dale Road) SFN 6030106 - Currently Not BR Eligible for replacement: L=28'; SD/FO=0; SR=99.8; DSR=N; Original ratings before county repair: BR Eligible for replacement: L=28'; SD/FO=1; SR=55.6; DSR=7; 97515~|~2~|~2~|~02/BRF/MCEO~|~"02/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 71-W292(Coopermill Road) SFN 6038220 - BR Eligible for replacement: L=109'; SD/FO=1; SR=20.9; DSR=7; 97515~|~3~|~3~|~03/BRF/MCEO~|~"03/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 301-00.02(Moore Road) SFN 6044336 - BR Eligible for replacement: L=107'; SD/FO=1; SR=34.2; DSR=4 97515~|~4~|~4~|~04/BRF/MCEO~|~"04/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 38-S481 (Hamby Hill Road) SFN 6043143 - BR Eligible for replacement: L=64'; SD/FO=1; SR=20.9; DSR=7 91259~|~1~|~1~|~01/STR~|~On SR141, begin project 2.52 miles north east of CR8 (Symmes Creek Road). It is proposed to repair the slip. Fed Dec. #OH11-02. 80%fed/20%state 111659~|~1~|~1~|~01/SAF~|~Install left turn lanes and upgrade the signal on US-127 and close or define access points along SR-725 in the Village of Camden 96002~|~1~|~1~|~01/S<2~|~100% federal funding for signal work 98694~|~1~|~1~|~01/CMQ~|~Widening McClurg Road from State Route 7 to Todd Avenue, in Boardman Township, Mahoning County, Ohio. 103721~|~1~|~1~|~01/NHS~|~Install a Restricted Crossing U-Turn Intersection (RCUT) to completely remove the median opening at the intersection of Butterbridge Road. 103721~|~1~|~3~|~03/NHS~|~Replacing the linked culvert. 103721~|~1~|~2~|~02/NHS~|~Widening of the two linked structures > 20' span. 114157~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement project for FY2027. Various routes and sections in D10. 95785~|~1~|~1~|~01/STR~|~from SLM 13.25 to SLM 17.64 117431~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing. 108025~|~1~|~1~|~01/NFP~|~Mowing 123570~|~1~|~1~|~01/SAE~|~Replacing R-W/R striping 114513~|~1~|~1~|~01/STR~|~Resurfacing on the rural section of CLI-68 114513~|~1~|~2~|~02/S5K~|~Resurfacing on the small urban section of CLI-68 107209~|~1~|~1~|~01/ENH~|~Sidewalk improvement along 5th Ave in the City of Youngstown. 91857~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4203720 KNO SR661 2.98 Intersect: Sycamore Creek; BR Eligible for Replacement: Length=93 SD/FO(1) SR=54.4 DSR=4 86824~|~1~|~1~|~01/BRO~|~80/20 fund split for federal BHF funds 104712~|~1~|~1~|~01/CMQ~|~Upgrade and interconnect work at 95 signalized intersections in Clermont County, OH. 122878~|~1~|~1~|~01/NFP~|~All work included in this plan split. 115599~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 115599~|~1~|~2~|~02/NFA~|~SIB Loan 97171~|~1~|~1~|~01/SAF~|~Safety/local funding for new signal and left turn lanes on SR-3 at Plumb Rd 85080~|~1~|~2~|~02/BRO/Sene~|~7440960 SEN CR592 11.68 Intersect: Branch Of Wolf Creek Lib 85080~|~1~|~1~|~01/BRF~|~Rehab 3 bridges:7436548 SEN CR12 1.45 Intersect: Silver Creek 7438109 SEN CR38 7.38 Intersect: Wolf Creek East Br 105361~|~1~|~1~|~01/IMS~|~Smooth seal 121536~|~1~|~1~|~01/SAF~|~Fast Dry Pavement Markers 102355~|~1~|~1~|~01/NFP~|~Maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 103583~|~1~|~1~|~01/NFP~|~Repair damaged beams on structure UNI-4-13.20 106429~|~1~|~1~|~01/BRF/ROSE~|~Village of Roseville Local Programs Municipal Bridge Funding - 4R87 (80% Federal) / TRC (15% 4BG7) / 4BG7 (5% Local) - See CAP Comments - Replacement of SFN 6433588: BR Eligible for Replacement; Length = 120; SD/FO (1); DSR = 5; SR = 32.5 111231~|~1~|~1~|~01/IMS~|~Culvert replacement/rehab 90362~|~1~|~2~|~02/STR~|~Culvert Replacement HUR-162-8.72 90362~|~1~|~1~|~01/S<2~|~Culvert Relining HUR-61-15.93 94784~|~1~|~1~|~01/CMQ~|~Construct 2 missing trail links on the existing 96 mile trail from Cincinnati to Urbana. 114467~|~1~|~1~|~01/NHS~|~Resurfacing SR 151 115915~|~1~|~1~|~01/ENH/MIL~|~Construction Split 100% Local for Multiuse Path/Pedestrian Improvements. 114526~|~1~|~1~|~01/STR~|~Double micro on LAW 141 114526~|~1~|~2~|~02/STR~|~Bridge Preventative Maintenance 110214~|~1~|~1~|~01/SAE~|~Install flashing yellow arrow signals and equipment on the corridor of SR-747 from Devitt to Tylersville 96485~|~1~|~1~|~01/SAF~|~Flat Sheet sign replacement project in FY2018. Various routes and sections in HOC and WAS counties. Funded 80 federal/20 state. 97194~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation - 4PS7 (100% State) - No CAP - Collision Damage repairs on SFN 3001687, Gue-IR 70-16.55 110388~|~1~|~1~|~01/NHS~|~Improve intersection of FRA Broad (SR 16) at James Rd 110388~|~1~|~2~|~02/SAF~|~Adding split for utility work 96263~|~1~|~1~|~01/SAF~|~This split uses federal Safe Routes to School funding and uses Toll Revenue Credit to bring the federal percentage to 100%. 115099~|~1~|~1~|~01/S<2~|~Landslide repair by drilled shaft wall. 84492~|~1~|~1~|~01/IMS~|~Resurfacing a portion of IR 275 in Hamilton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 84492~|~1~|~2~|~02/IMS~|~Minor rehab of 4 mainline twin bridges consisting of overlays, painting, barrier upgrades. 84492~|~1~|~3~|~03/IMS~|~Plan Split to cover the cost of the truss portions of the Combs Hehl Bridge over the Ohio River. Approach bridge work is paid for separately. 84492~|~1~|~4~|~04/IMS~|~Kentucky Approach Bridges. 100% KYTC responsibility. 84492~|~1~|~5~|~05/IMS~|~CCTV items 84492~|~1~|~6~|~06/IMS~|~Waterway Permit Delay costs. 111083~|~1~|~1~|~01/SAF~|~Landslide debris spilled onto HAM-US 50 Columbia Parkway at 4 locations requiring the closure of the Parkway, the removal of the soil from the roadway and from on and above the retaining wall. A light pole was knocked over onto the pavement by the landslide. Four light poles were in jeopardy of being knocked over by the landslide and required removal. The largest of the landslide measures approximately 200 x 200 feet. 101692~|~1~|~3~|~03/NHS~|~NHS 100% City of Ashland 101692~|~1~|~1~|~01/NHS~|~NHS 80/20 District Allocation/City of Ashland 101692~|~1~|~2~|~02/S<2~|~STP < 200000 80/20 District Allocation/City of Ashland 88854~|~1~|~1~|~01/NFP~|~This split is for state funds 115612~|~1~|~2~|~02/NFP~|~Plan split for work using 100% local funds for waterline replacement and unwarranted signal removals. 115612~|~1~|~1~|~01/ENH~|~Plan split for MPO fund eligible work including pedestrian & bicycle enhancements, ADA ramps, etc. 92665~|~1~|~1~|~01/MPO~|~Resurfacing CR 509 2.19 - 2.97 99994~|~1~|~1~|~01/IMS~|~90/10 federal/state plan split for all work. 98776~|~1~|~2~|~02/ENH~|~Replacement of existing sidewalk and installation of new sidewalk along Cincinnati Dayton Road between Lesourdsville West Chester Road/Station Road and the IR-75 NB on-ramp. 98776~|~1~|~1~|~01/S<2~|~Widening of Cincinnati Dayton Road to provide an additional center turn lane and southbound thru-lane between Lesourdsville West Chester/Station Road and the IR-75 NB on-ramp. 107227~|~1~|~1~|~01/SAF~|~Guardrail installation/replacement project on various routes and sections in Gallia Co. CEAO funded using HSIP for FY2022. Funded 100% federal. 116768~|~1~|~1~|~01/STR~|~This plan spilt is for work located outside the city of Van Wert in the rural area. Work is from SLM 0.00 to 7.01. State preservation funds. 116768~|~1~|~2~|~02/S5K~|~This plan spilt is for work located outside the city of Van Wert but in the urban area. Work is from SLM 7.01 to 7.33 on both sides, then on the left side from 7.33 to 7.53, then both sides from 7.53 to 7.79, then on the left side from 8.37 to 8.44. State preservation funds. 116768~|~1~|~3~|~03/S5K/VAN~|~(80/20 Items) This plan spilt is for work located inside the city of Van Wert. Work is from SLM 7.33 to 7.53 on the right side of the road, then on both sides from 7.79 to 8.37, then on the right side from 8.37 to 8.44. State preservation funds. 116768~|~1~|~4~|~04/S5K~|~(100% City Items) This plan spilt is for work located inside the city of Van Wert. Work is from SLM 7.33 to 7.53 on the right side of the road, then on both sides from 7.79 to 8.37, then on the right side from 8.37 to 8.44. State preservation funds. 110572~|~1~|~1~|~01/S>2~|~2" mill and fill with asphalt concrete on: MIA US 36 SLM 11.56 to 12.60 110572~|~1~|~2~|~02/S<2~|~Full Depth replacement of aggregate base, base pavement, and subgrade compaction on US 36 from 11.67 to 11.85 110572~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 108491~|~1~|~1~|~01/S<2~|~Slide repair PIK 551 2.06 96530~|~1~|~1~|~01/IMS~|~Generic Plan Split for Cosntruction Inspection FY2019/2020 (A) 110872~|~1~|~1~|~01/NHS~|~Bridge painting on US 30 bridges. US 30 is on the NHS. Federal and state funds from the District Preservation Program budget. 114768~|~1~|~1~|~01/SAF~|~Guardrail upgrades/replacements on various county routes throughout Trumbull County. 110385~|~1~|~1~|~01/S<2~|~UNI-33I-0.00 to 0.51; CR 133 (NW Parkway) to Marysville Corp 110385~|~1~|~2~|~02/NHS~|~Items associated with work on the US 33 Bridges 88781~|~1~|~1~|~01/STR~|~District Allocation 88781~|~1~|~2~|~02/S>2~|~District Allocation 98597~|~1~|~1~|~01/STR~|~Replace small culvert CLE-133-3149, pave inverts for WAR-123-0999 and WAR-123-1023. 98597~|~1~|~3~|~03/NHS~|~Pave invert small culvert WAR-122-0412. 98597~|~1~|~2~|~02/S>2~|~Pave invert for CLE-132-0117. 116843~|~1~|~1~|~01/S5K/LANC~|~"01/S5K/PV/LANC" - See CAP Comments - resurfacing and related roadway work items. 110541~|~1~|~1~|~01/NHS~|~plan split for the median repair 98748~|~1~|~1~|~01/BRO~|~"01/BRO/BR/FCEO" CEAO Funded project for replacement of deficient bridge for Fairfield County" w/ federal max of $892,430 97019~|~1~|~1~|~01/NFP~|~4805909, 4805917 6201628 119256~|~1~|~1~|~01/STR~|~Highway Lighting 83634~|~1~|~5~|~05/STR~|~Replace culvert 280870661 in the rural area. 83634~|~1~|~3~|~03/STR~|~Plan split for items of work for the new turn lane. Per Resolution 13-171, Geauga Co. participation is capped $50k. 83634~|~1~|~4~|~04/S>2~|~Replace culverts 280870387 and 280870504 in the urban area. 83634~|~1~|~2~|~02/STR~|~80/20 fund split using federal RURAL STP funds from SLM 6.20 to SLM 7.70. West of SLM 6.20 is URBAN STP. 83634~|~1~|~1~|~01/S>2~|~80/20 fund split using federal URBAN STP funds from SLM 2.73 to SLM 6.20. East of SLM 6.20 is RURAL STP. 98676~|~1~|~1~|~01/SAF~|~Place centerline, edge line & other pavement markings on various routes in MER Co. 98256~|~1~|~1~|~01/STR~|~Reactive Pavement Maintenance/GAP Project. 98256~|~1~|~2~|~02/S<2~|~Reactive Pavement Maintenance/GAP Project 85101~|~1~|~1~|~01/STR~|~Resurfacing a portion of US 127 & SR 744 in Preble County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 114778~|~1~|~1~|~01/NFP~|~Const inspection 93564~|~1~|~1~|~01/SAE~|~At the intersection of Reynolds Rd and Central Ave (US-20-10.65). 107794~|~1~|~1~|~01/MPO~|~Resurfacing CR 50 from 0.00 to 2.85 in the City of New Franklin. 88571~|~1~|~2~|~02/STR~|~Overlay US 68 with asphalt concreteUSR 68 SLM 11.43 to 20.26 88571~|~1~|~1~|~01/NHS~|~Overlay US 33 & US 68 with asphalt concreteUSR 33 SLM 6.57 to 10.74USR 68 SLM 0.00 to 2.29 124341~|~1~|~1~|~01/NFA~|~All work included in this plan split. 112411~|~1~|~1~|~01/NFP~|~Cracksealing plan split 112459~|~1~|~1~|~01/BRF/COL~|~OBPP replacement of SFN 1531344, utilizing 100% federal funds (up to max of $675,714) 98816~|~1~|~1~|~01/IMS~|~Split for lighting upgrade 91072~|~1~|~1~|~01/NHS~|~SEN US224 14.77-19.83 98123~|~1~|~1~|~01/ENH~|~Extension of streetscape improvements being performed under PID 88317, on Dayton Xenia Road between Ken Klare Drive and West Lynn Drive. Enhancements include installation of brick pavers, decorative lighting, and minor landscaping. 105741~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items 97958~|~1~|~1~|~01/NHS~|~Resurfacing 109854~|~1~|~1~|~01/NFP~|~Culverts 90634~|~1~|~1~|~01/NFP~|~This is a mowing contract using maintenance operating funds. 114833~|~1~|~1~|~01/IMS~|~FRA-70 pavement plan split 113127~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment. 112690~|~1~|~1~|~01/STR~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program. 113201~|~1~|~1~|~01/NHS~|~Deck replacement > 20' span. 113201~|~1~|~2~|~02/NHS~|~Sanitary sewer replacement on SR 91 bridge paid by DSSS. 113201~|~1~|~3~|~03/NHS~|~Gas line replacement work on SR 91 bridge paid by Enbridge. 92016~|~1~|~1~|~01/NHS~|~Bridge Work:ERI-SR-2 19.040 SFN (2201046) R HURON RIVER/N&S RR/CH-126 Preventive Maintenance ? Expansion joint repair/replacement (048) ? Deck Sealing (051) ? Bridge railing upgrade/repair (061) ? Channel drift removal (081) ? Substructure Sealing (088) Reactive Maintenance ? Backwall repl/repair (029) Minor Rehabilitation ? Conc patching (non-deck) (010) ? Superstructure (other) (039) ? Pile encasement (084) ? Approach slab repl/repair (100) ERI-SR-2 19.040 SFN (2201038) L HURON RIVER/N&S RR/CH-126 Preventive Maintenance ? Expansion joint repair/replacement (048) ? Deck Sealing (051) ? Bridge railing upgrade/repair (061) ? Channel drift removal (081) ? Substructure Sealing (088) Reactive Maintenance ? Backwall repl/repair (029) Minor Rehabilitation ? Conc patching (non-deck) (010) ? Superstructure (other) (039) ? Pile encasement (084) ? Approach slab repl/repair (100) 121710~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing CEAO LBR Federal funds at 95% (including 15% credit bridge) up to the Federal maximum. 84626~|~1~|~1~|~01/STR~|~Resurfacing ProjectSCI SR140 6.03 - 7.28 & 7.80 - 16.60 LAW-SR-140 0.000 to 1.68Brdgs pave thru.4402049 LAW SR140 0.82 Intersect: Hales Creek7304331 SCI SR140 7.84 Intersect: Falls Creek7304366 SCI SR140 8.3 Intersect: Falls Creek7304471 SCI SR140 9.73 Intersect: StreamCO CC 01 pavement plan split added for rural portion. 80/20 split01/STR/PV/State 84626~|~1~|~2~|~02/S<2~|~SCI SR140 Urban Brdg rehabCO CC 02 Brdgs plan split added for urban portion. 7304064 SCI SR140 2.48 Intersect: Wards Run7304099 SCI SR140 3.22 Intersect: Wards Run80/20 split02/S<2/BR/State 84626~|~1~|~3~|~03/S<2~|~Resurfacing Project.SCI SR140 0.42 - 6.03Pave thru brdgs.7303025 SCI SR140 4.07 Intersect: Dry Run7304021 SCI SR140 1.65 Intersect: Oven Lick7304153 SCI SR140 3.97 Intersect: Dry Run Creek7304269 SCI SR140 5.04 Intersect: Stream80/20 split03/S<2/PV/State 84626~|~1~|~4~|~04/STR~|~Brdg plan splits rural. Covers brdgs :7304382 SCI SR140 8.52 Intersect: Frederick Creek7304501 SCI SR140 12.39 Intersect: Sugar Camp Creek7304544 SCI SR140 12.98 Intersect: Bloom Furnace Stream7304595 SCI SR140 15.07 Intersect: Jacksons Fork7304412 SCI SR140 9.22 Intersect: Stream7304447 SCI SR140 9.48 Intersect: Stream80/20 split04/STR/BR/State 104665~|~1~|~1~|~01/NFP~|~Bridge repair plan split 124363~|~1~|~1~|~01/NFA~|~Streetscape project for revitalization of downtown in Village of Fredericktown. 99572~|~1~|~1~|~01/SAE~|~Upgrading existing pavement markings on various Huron County roads. 115994~|~1~|~1~|~01/NHS~|~Slide repair 108935~|~1~|~1~|~01/NHS~|~FY2022 Urban Paving in the City of Middletown on SR 4. This plan split is the 80% ODOT and 20% City items on the Urban Portion of SR 4. 108935~|~1~|~2~|~02/NHS/MIDD~|~FY2022 Urban Paving in the City of Middletown on SR 4. This plan split is the 100% City items on the Urban Portion on SR 4. 108935~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 92921~|~1~|~1~|~01/NFA~|~Salt Shed @ Wilgus Outpost. 100% state,4MA7 facilities. 01/NFA/OT/State 114091~|~1~|~1~|~01/NFA~|~Created for J&C involvement 95171~|~1~|~1~|~01/SAF/MCEO~|~County Engineer's Association Highway Safety Improvement Program (HSIP) Funding - 4HB7 (100% Federal) - See CAP Comment - Muskingum County Wide Pavement Marking of various County Roads. 121328~|~1~|~1~|~01/NHS~|~Rural Population < 5,000 Plan Split 121328~|~1~|~2~|~02/NHS~|~NHS Fraklin County Population >200K Split 121328~|~1~|~3~|~03/S>2~|~STP >200,000 Split 121328~|~1~|~4~|~04/S5K~|~STP >5 Split 121328~|~1~|~5~|~05/STR~|~STP Rural Split 121218~|~1~|~1~|~01/MPO/BEAV~|~MVRPC carbon reduction program funded construction of a sidewalk and shared use path in the City of Beavercreek. 121218~|~1~|~2~|~02/NFA/BEAV~|~100% locally funded work on sidewalk at the southern end of the project. West side of Grange Hall road to Kensington Glen. 81543~|~1~|~1~|~01/ERD~|~ New access road to service Center for Business and Education Park in Yellow Springs on East Enon Road .30 mi. north of Dayton Yellow-Springs to Dayto YS at .36 mi. west of East Enon Rd. 117908~|~1~|~1~|~01/NFA~|~NEVI Phase 1, I-70-F, BEL 208-225 108861~|~1~|~1~|~01/SAF~|~All work is in this split. 100569~|~1~|~1~|~01/S>2~|~Resurfacing TUS-36 with microsurfacing including pavement repairs and pavement markings. 100569~|~1~|~2~|~02/NHS~|~Resurfacing TUS-36 from CR 62 to TUS-250 and TUS-250 from TUS-36 to HAS Co. Line, including microsurfacing, pavement repairs and pavement markings. 91157~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in Villages at various locations in D10. Federal 80% and State 20%. 91157~|~1~|~2~|~02/STR~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in Villages at various locations in D10. Rural Federal 80% and State 20%. 91157~|~1~|~3~|~03/S<2~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in Villages at various locations in D10. Urban Federal 80% and State 20%. 103435~|~1~|~2~|~02/SAE~|~Work funded by the safety program. 100% state funds SAC 4BC7. 103435~|~1~|~1~|~01/NFP~|~Work funded with 100% state funds from the District Preservation Program SAC 4PS7. 111425~|~1~|~1~|~01/S<2~|~Asphalt resurfacing of Front Street in City of Marietta. WAS Front Street (CR 2001) 0.33-1.05. 80% Federal and 20% Local funds. 117789~|~1~|~1~|~01/NFP~|~Reconstruction of the Rest Area Parking lot, sidewalks, ADA ramps and other miscellaneous items 124155~|~1~|~1~|~01/BRO~|~Bridge work for bridge on eligible system 110150~|~1~|~1~|~01/STR~|~Replace culvert at MRW-42-22,69 92713~|~1~|~1~|~01/MPO~|~Resurfacing CR 654 3.42 - 4.78 108318~|~1~|~1~|~01/NFP~|~Expansion joint armor repair 102370~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. NOB 821 0.00-7.49 and WAS 821 11.73-20.77. Rural other federal aid funded 80 federal/20 state. 105384~|~1~|~1~|~01/NHS~|~Smooth seal on NHS route: AUG US 33 SLM 23.07 to 29.20 105384~|~1~|~2~|~02/STR~|~Smooth seal on rural route: AUG SR 29 SLM 6.40 to 9.67 105384~|~1~|~3~|~03/S<2~|~Smooth seal on small urban routes: SUG SR 29 SLM 5.31 to 6.40 94317~|~1~|~1~|~01/STR~|~Full Depth Pavement Replacement along US 22 94317~|~2~|~2~|~02/S5K~|~Resurfacing along US 22 and SR 723. 115989~|~1~|~1~|~01/NFA~|~Slope repair/stabilization 85115~|~1~|~1~|~01/IMS~|~Deck overlay bridge repairs with minimal approach work on SFN 5704715 MOT 75 0295 L and SFN 5704774 MOT 75 0295 R. 75940~|~1~|~2~|~02/NHS~|~Do pavement marking and replace RPM's on current project at various locations on MOT US 35 from 13.85 to 15.07. 75940~|~1~|~1~|~01/NHS~|~JOINT REPAIR AND DIAMOND GRINDING in Dayton from Dearborn/Abbey to the junction of IR 75. 97740~|~1~|~1~|~01/BRO~|~Bridge replacement project. WAS 339 12.01, SFN 8404178. Bridge on system eligible funded 80 federal/20 state. 113039~|~1~|~1~|~01/NHS/HUBB~|~Resurfacing, urban paving in the City of Hubbard. 113039~|~1~|~2~|~02/S>2/HUBB~|~Resurfacing, urban paving in the City of Hubbard. 113039~|~1~|~3~|~03/NHS/HUBB~|~Full and partial depth pavement repairs and curb ramp replacements. 95570~|~1~|~1~|~01/MPO/Cols~|~Replace SFN 2516446 95570~|~1~|~2~|~02/MPO/Cols~|~Safety improvements on S. Hamilton Road (SR 317) from Refugee Road to 550 feet north of Groves Road 106155~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 1.11. DSR MRG-003. Rural other federal aid funded 80 federal/20 state. ER funds. 99087~|~1~|~1~|~01/NHS~|~The installation of a traffic signal and increasing the capacity of the northbound approach. 91939~|~1~|~2~|~02/IMS~|~Rehabilitate Bridge HAM-50-2180N by repairing gusset plates with pack rust at several locations and spot painting at isolated critical locations to arrest packrust. Other minor rehabilitation items may be addded. 91939~|~1~|~1~|~01/NHS~|~Rehabilitate Bridge HAM-50-0376L (SFN 3102521) by replacing gusset plate rivets with bolts for members L4/L6 in Spans 2 and Span 3. Perform spot painting at isolated critical locations to arrest pack rust development. 82910~|~1~|~1~|~01/S>2~|~SR91 0.00-0.19 & 5.01-5.12 & 5.52-6.19 107877~|~1~|~1~|~01/STR~|~District preservation funds. 113302~|~1~|~2~|~02/MPO/HAM~|~Plan split for improvements at signalized intersections that do not meet a warrant. 113302~|~1~|~1~|~01/MPO~|~The purpose of the City of Hamilton?s signal project is to upgrade the traffic signal system to a central based signal system, upgrade traffic signal controllers, and detection, and improve communication between the signals using fiber optic. 109186~|~1~|~1~|~01/S>2~|~Install reinforced soil slope along southbound SR 674 114257~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges 122984~|~1~|~1~|~01/MPO~|~Plan Split for federally eligible construction items 86726~|~1~|~2~|~02/STR~|~Bridge Work - WAY-094-13.37 sfn:8504024 86726~|~1~|~1~|~01/STR~|~Resurfacing 122968~|~1~|~1~|~01/CMQ~|~Plan split for construction of a shared-use path and bus shelter. 88689~|~1~|~2~|~02/NFA~|~Microsurface the existing roadways as Preventative Maintenance CHP 560 SLM 2.76 to 9.94 (ZR 000) 88689~|~1~|~1~|~01/STR~|~Microsurface the existing roadways as Preventative Maintenance on DAR SR 47 SLM 13.89 to 18.37 SHE SR 29 SLM 7.64 to 14.55 CHP 560 SLM 0.00 to 2.76 (OC 000) 88689~|~1~|~3~|~03/S>2~|~Microsurface the existing roadways (Preventive Maintenance) MIA SR 718 SLM 8.35 to SLM 10.14. 111998~|~1~|~1~|~01/NHS~|~Repair slips/slides along TRU SR 5 embankment. 99645~|~1~|~1~|~01/STR~|~Work on the rural STP portion from SLM 0.00 to 3.13 at 80/20 fed/state. 99645~|~1~|~3~|~03/NHS~|~Work on the NHS portion from SLM 3.19 to 6.32 at 80/20 fed/state. 99645~|~1~|~2~|~02/S>2~|~Work on the urban STP portion from SLM 3.13 to 3.19 at 80/20 fed/state. 99645~|~1~|~4~|~04/STR~|~Split for work on 3 culverts 99645~|~1~|~5~|~05/NFP~|~Split for 100% local items of work in Madison 122516~|~1~|~1~|~01/NFP~|~ODNR plan split. 123945~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 111411~|~1~|~1~|~01/STR~|~Culvert replacement project on VIN 677 3.02 (CFN 1811104) and VIN 677 3.21 (CFN 1811105). Rural other federal aid funded 80 Federal/20 State. 87703~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 114984~|~1~|~1~|~01/STR~|~Pavement RPM's. 110090~|~1~|~1~|~01/S>2~|~Culvert repair/replace on Lrg. Urban routes. 110090~|~1~|~2~|~02/NHS~|~Culvert repair/replace on NHS route. 110090~|~1~|~3~|~03/STR~|~Culver repair/replace on rural route 117220~|~1~|~1~|~01/SAF~|~Install sidewalk and pedestrian safety improvements along Kemper Rd 119271~|~1~|~1~|~01/IMS~|~Plan Split for interstate locations 119271~|~1~|~2~|~02/SAE~|~Add cantilever signs on SB US-27 approaching Struble Rd. 111608~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split for the City of Delaware. 111608~|~1~|~2~|~02/S>2~|~General system Paving Plan Split for resurfacing, repairs, striping, etc. 111608~|~1~|~3~|~03/S>2/Del~|~Items to be paid 100% by the City of Delaware 90235~|~1~|~1~|~01/S<2~|~"01/S<2/OT/Steu" - At the intersection of Lovers Lane and Sunset Blvd (SR 43), provide modified lane configurations at the eastbound, northbound and southbound approaches. At the westbound approach, provide an increased turning radius. Rebuild existing traffic signal. Provide new curb, sidewalk and curb ramps. 109840~|~1~|~1~|~01/S<2~|~Resurfacing in JAC. 109840~|~1~|~2~|~02/S<2~|~Local MatchResurfacing in JAC. 112854~|~1~|~1~|~01/NHS~|~D09 Chipseal FY27 104046~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County Engineer's CEAO Bridge Funding - 4B87 (80% Federal) / 4B87 (15% Credit Bridge) / 4BG7 - See CAP Comments - Replacement of deficient Muskingum County Bridge utilizing CEAO funding. 112732~|~1~|~1~|~01/NHS~|~Structural Liner at DEL-257-3.58 and FAY-207-1.06. Concrete bottom at MRW-95-3.11 116686~|~1~|~1~|~01/NHS~|~All work is in this plan split. 98612~|~1~|~1~|~01/NFP~|~Construction of a noise wall along Ohio Turnpike near Jesse Drive, in the City of Hudson, Summit County, Ohio. 110055~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-257-0.00-0.35 109285~|~1~|~1~|~01/STR~|~Work outside of the Van Wert Urban Area. All the work on CR 418 east of the Van Wert Urban Area Limits where the CR 418 leaves the City of Van Wert on the right side at 11.14 and all work on CR 173. Work includes resurfacing, striping, raised pavement markers and edge line rumble stripes. 109285~|~1~|~2~|~02/S<2~|~Work inside of the Van Wert Urban Area. Work is on CR 418 from the beginning of the project at Wayne Street to the Van Wert Urban Area boundary where CR 418 leaves the City of Van Wert on the right side at 11.14. Work includes resurfacing, striping. raised pavement markers and edge line rumble stripes. 112840~|~1~|~1~|~01/NFA~|~Lima OP Truck Storage 96607~|~1~|~2~|~02/S<2~|~Culvert replacement project. HOC 664 16.51 (CFN 376641651). Urban other federal aid funded 80 federal/20 state. 96607~|~1~|~1~|~01/STR~|~Culvert replacement project. HOC 180 6.27 (CFN 371800220), HOC 180 7.59 (CFN 371800290), HOC 180 9.51 (CFN 371800350), HOC 180 11.85 (CFN 371800440), HOC 180 14.36 (CFN 371800535), HOC 180 15.48 (CFN 371800575), HOC 180 15.91 (CFN 371800595), HOC 664 16.87 (CFN 376641687), HOC 664 21.36 (CFN 376640835), HOC 664 21.82 (CFN 376640865) and HOC 664 23.15 (CFN 376642315). Rural other federal aid funded 80 federal/20 state. 96607~|~1~|~3~|~03/NFA~|~Culvert replacement project. HOC 374 20.13 (CFN 373740805), HOC 374 24.13 (CFN 373741050). Not on any federal aid system funded 100% state. 110870~|~1~|~1~|~01/IMS~|~Bridge painting on interstate bridges. Federal and state funds from the District Preservation Program budget. 110870~|~1~|~2~|~02/STR~|~Bridge painting on the rural STP system. Federal and state funds from the District Preservation Program budget. 117071~|~1~|~1~|~01/STR~|~Split for the bridge replacement 119809~|~1~|~1~|~01/SAF~|~Reconstruction of Second Creek Rd (CR-19) in Clinton County to increase travel lane and shoulder widths, install rumble stripes, and remove roadside hazards. 105430~|~1~|~2~|~02/IMS~|~Replace structure FRA 70 1301R (SFN 2504766) 105430~|~1~|~1~|~01/IMS~|~Replace deck on structure FRA-70-1301L (SFN 2504677) 124058~|~1~|~1~|~01/SAF~|~Plan split for eligible safety items 124078~|~1~|~1~|~01/IMS~|~Rehabilitation of superstructure SFN 3000990 along IR 70 in Guernsey County. 118837~|~1~|~1~|~01/SAF/STCE~|~Intersection improvements on Whipple Ave (CR 219) at 4th and 3rd streets. 112504~|~1~|~1~|~01/SAF~|~Traffic signal and pedestrian improvements from Scott Drive to Kienle Drive in the City of Piqua. 115242~|~1~|~1~|~01/ENH~|~Construct sidewalks and corresponding ADA facilities (95% TAP Funds). 115740~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 104171~|~1~|~1~|~01/STR~|~Pavement repairs 103650~|~1~|~1~|~01/BRO~|~Rehabilitate bridge by replacing existing asphalt wearing surface with new asphalt wearing surface on prestressed concrete boxbeam bridge - TUS-416-0901 (SFN 7905998) 89135~|~1~|~1~|~01/BRF~|~6631037 PIK CR37 3.04 Intersect: Pee Pee Creek CEAO 80 Fed/20 Local Match Pike County 01/BRF/BR/Pike 94174~|~1~|~1~|~01/STR~|~Resurfacing GRE SR 72 SLM 14.48 to 19.01 94174~|~1~|~2~|~02/STR~|~Bridge maintenance. 94174~|~1~|~3~|~03/SAF~|~Centerline rumble stripes 100053~|~1~|~1~|~01/NFP~|~Building new outpost at ATB SR 11 Rest Area. 103677~|~1~|~1~|~01/SAF/MCEO~|~"01/SAF/OT/MCEO" ODOT Safety - Pavement Marking 4HJ7(100% Federal) - CAP of $50,000.00 federal - Pavement Marking on identified routes 84386~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on BEL-9-14.52 to 14.62; includes asphalt overlay, milling, pavement repairs, pavement marking 84386~|~1~|~1~|~01/STR~|~General System Minor Rehab. on BEL-9-0.00 to 14.52; includes asphalt overlay, milling, pavement repairs, pavement marking 107431~|~1~|~1~|~01/SAF~|~Safety improvements on County Road in Mercer County. 105187~|~1~|~1~|~01/NHS~|~Split for deck replacement on two structures 100888~|~1~|~1~|~01/NFA~|~LAW 775 14.36 (SFN4404777) 95295~|~1~|~1~|~01/NFP~|~Split 118840~|~1~|~1~|~01/STR~|~Resurfacing SR 518 107441~|~1~|~1~|~01/STR~|~AC overlay with repairs 107441~|~1~|~2~|~02/NFA~|~AC overlay with repairs 111609~|~1~|~1~|~01/STR~|~Installation of drilled shaft wall for slope stabilization along SR 37 and Rush Creek. 102824~|~1~|~1~|~01/STR~|~STP Rural pavement 102824~|~1~|~2~|~02/STR~|~STP rural bridge 99711~|~1~|~1~|~01/NFP~|~Loop maintenance and repair along various routes throughout District Four. 88544~|~1~|~1~|~01/MPO~|~Plan Split for SUM Norton Road (TR 120) from 0.75 to 2.30 114499~|~1~|~1~|~01/S<2/TOR~|~Construction of bridge with 95% Municipal Bridge funds (4R87 includes 15% Toll Revenue Credit) and 5% Local funds (4BG7). 115860~|~1~|~1~|~01/IMS~|~Split for BEL-70-10.11 conduit. 123949~|~1~|~1~|~01/NFA/GCEO~|~Mill and Fill along CR 71 (Peoli Rd). 115845~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..at various locations in D10. 103028~|~1~|~1~|~01/NHS~|~Installing walkway/bikeway on north side of SR 18 between I-77 and Cleveland Massillon Road. 108095~|~1~|~1~|~01/IMS~|~Bridge repair on bridges over 20'. 108095~|~1~|~2~|~02/IMS~|~Bridge repair on bridges under 20'. 108095~|~1~|~3~|~03/STR~|~Bridge repair on rural route bridge 108095~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 103744~|~1~|~1~|~01/SAF~|~Plan Split 1 109708~|~1~|~1~|~01/STR~|~Chip seal on:CHP-54 SLM 0.00 to 1.70LOG-292 SLM 0.52 to 3.63MIA-201 SLM 9.16 to 12.51 109708~|~1~|~2~|~02/S<2~|~Chip seal on:LOG-47 SLM 15.33 to 16.77 91847~|~1~|~1~|~01/STR~|~General System Minor Rehab.of TUS-39-2.94 to 7.14; includes rigid repairs, 3 in. asphalt overlay, pavement marking 106622~|~1~|~1~|~01/SAF~|~Install turn lanes at SR 183 and upgrade signal. 97436~|~1~|~1~|~01/S<2~|~This split is for all resurfacing work on CR434. This split uses 80% Fed. (4B77) - 20% Local (4BG7) 92555~|~2~|~4~|~04/SAF~|~Plan Split for all work Greater Cincinnati Water Works in Part 2. (Extending the southbound right turn lane to westbound IR 275) 92555~|~2~|~3~|~03/SAE~|~Part 2 Set of Plans Safety Work: 0.07 miles north of IR275 to Struble Road (0.61 miles north of IR275). Extend southbound right turn lane to westbound IR275 on ramp. Original design under pid 84437 but sold under pid 92555 92555~|~1~|~1~|~01/SAE~|~Part 1 Set of Plans Safety Work: 0.07 miles north of IR275 to Struble Road (0.61 miles north of IR275) Widen northbound US27 for a third lane ending as a right turn lane at Struble. Part 1 originally designed and sold under PID 92555; 92555~|~1~|~2~|~02/SAF~|~Plan Split for all work Greater Cincinnati Water Works in Part 1. (widen northbound US 27 for a third lane ending at Struble). 99959~|~1~|~1~|~01/IMS~|~Pavement work to reconstruct the interchange including ramp work 99959~|~1~|~2~|~02/IMS~|~Work on 5 structures to include replacement and/or lengthening 115034~|~1~|~1~|~01/SAF~|~Split for ramp clear work at WB Clague Road exit, PID 115034. 115034~|~1~|~2~|~02/SAF~|~Split for ramp clear work at WB West 130th Street exit, PID 115031. 117376~|~1~|~1~|~01/MPO/BELO~|~Resurfacing. 124193~|~1~|~1~|~01/BRO~|~Bridge hit repair. 90428~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 574 0.15 (SFN 6104770) and NOB 574 0.40 (SFN 6104835). 100% State funded. 114599~|~1~|~1~|~01/NFP~|~Chipseal in HIG. 114599~|~1~|~2~|~02/STR~|~Chipseal in HIG. 114599~|~1~|~3~|~03/S<2~|~Chipseal in HIG 110912~|~1~|~1~|~01/SAF~|~Safety funds plan split 102268~|~1~|~2~|~02/STR~|~Spray lining of CFN 781930390 TRU-SR 193-15.50 102268~|~1~|~1~|~01/STR~|~See linked structure 10' to 20' span. 124838~|~1~|~1~|~01/STR~|~Resurfacing work on CR 424 under the STP Rural classification. 90952~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% funds. 98544~|~1~|~1~|~01/NHS~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 95939~|~1~|~1~|~01/IMS~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Resurfacing of portions of Mus-70-(21.44-27.35) 95939~|~1~|~2~|~02/NFP~|~District Preservation Program - 4PS7 (100% State) - No CAP - Bridge work and deck sealing 116899~|~1~|~1~|~01/NFA~|~Adding for potential J&C involvement 121856~|~1~|~1~|~01/S5K/COS~|~Sidewalks and curb ramps along 2nd Street from Vine Street to Brown Lane. (TAP Safety 80% 4B37/20% 4HJ7) 121856~|~2~|~2~|~02/NFP/COS~|~100% Local drainage work. 109335~|~1~|~1~|~01/NFP~|~ODNR project to resurface south of river at Beaver Creek State Park 107765~|~1~|~1~|~01/NHS~|~Rock fall LAW 7 0.70 113327~|~1~|~1~|~01/NFP~|~The City will extend Abbott Park Way 1,100 feet. The extension will be 39? wide to match existing roadway as per city code. 113327~|~1~|~2~|~02/NFP~|~The City will extend Abbott Park Way 1,100 feet. The extension will be 39? wide to match existing roadway as per city code. 120110~|~1~|~1~|~01/NHS~|~added plan split. 123744~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings, and school zones throughout the district. 96232~|~1~|~1~|~01/NHS~|~NHS SLM US23 18.53 to 22.23; US23D 2.52 to 4.26 and 4.40 to 4.46 96232~|~1~|~2~|~02/S>2~|~STP>2 SLM US23: 15.31 to 18.53; US23D 4.26 to 4.40 96232~|~1~|~3~|~03/NHS~|~2500868 FRA-23D-2.95 Deck overlay 119051~|~1~|~1~|~01/BRO~|~Local Bridge funds to rehabilitate bridge 113412~|~1~|~1~|~01/SAF~|~100% CEAO HSIP funding for upgrading guardrail on county roads 114347~|~1~|~1~|~01/ENH~|~Paving B&O Trail from Bellville to Mansfield (North Lake Park) 113282~|~1~|~1~|~01/STR~|~Replace culverts:ERI-SR-113 20.179 CFN 1884885Replace with Box or Ellipse HUR-SR-13 4.130 CFN 1835332 Replace with Circular 114545~|~1~|~1~|~01/STR~|~Chip Seal 119815~|~1~|~1~|~01/NFA~|~Created for J&C Task Order 100562~|~1~|~1~|~01/IMS~|~Construction Inspection 105744~|~1~|~1~|~01/IMS~|~Plan split for pavement PM work 108803~|~1~|~1~|~01/IMS~|~Plan Split 106763~|~1~|~1~|~01/NFA~|~The City will widen approximately 5000 feet of Beech Road. 116056~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV/ - 94114~|~1~|~3~|~03/STR~|~Minor maintenance to the linked structures with a 10' to 20' span. 94114~|~1~|~2~|~02/STR~|~Bridge maintenance to the linked structures > 20' span. 94114~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 534 from 13.25 to 19.12 86697~|~1~|~2~|~02/S<2~|~Urbanizd Area Microsurfacing: ERI 6 19.25-23.12, 23.69-27.71 86697~|~1~|~1~|~01/STR~|~Rural Microsurfacing: ERI 6 23.12-23.69, LOR 82 0.00-10.06 96992~|~1~|~1~|~01/NFP~|~Added plan split due to funding 92342~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - D05 Facilities Funding - No CAP - Construction of storage buildings: 1) Coshocton County Garage (Cos-CR 621); 2) District 5 Headquarters (Lic-SR 13); 3) Duncan Falls Outpost (Mus-SR 60); 4) Moxahala Out Post (Mus-US 22); 5) Etna Township Out Post (Lic-SR 310); 122425~|~1~|~1~|~01/NFP~|~Plan split for crack sealing and maintenance of park driveway and parking lots 123859~|~1~|~1~|~01/IMS~|~Emergency project to repair the WAS 77 0.31 Bridge, SFN 8402949. Funded 100% State. 123211~|~1~|~1~|~01/MPO~|~Plan split for eligible TLCI funded implementation work that includes bike lanes, enhanced crossings and pedestrian upgrades. 123211~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 122468~|~1~|~1~|~01/NHS~|~Plan split is for the drainage improvement along BUT-27 100829~|~1~|~1~|~01/STR~|~Rehab Bridge BUT-732-0304 by replacing the deck and painting the structural steel. 88874~|~1~|~1~|~01/STR~|~District Allocation - 80/20 122147~|~1~|~1~|~01/NHS~|~Bridge Rehabilitation. 114677~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 94069~|~1~|~1~|~01/NFP~|~Construction of septic/leachfield at Gustavus outpost, Trumbull County, Ohio. 112971~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs using Indefinite Delivery Indefinite Quantity (IDIQ) construction project format. 95531~|~1~|~2~|~02/NHS~|~HIG 62 (13.56-15.80) This is for the portion of US 62 with a Local Match. Federal/Local Match 80/20 95531~|~1~|~1~|~01/NHS~|~HIG 73 (7.08-7.41) HIG 62 (13.32-13.56 / 15.80-15.89)Pave Thru bridge is SLM 13.4980% Federal /20% State 95531~|~1~|~3~|~03/NHS~|~Plan split for 100% local match to cover possbile curb ramp and sidewalk work. 102900~|~1~|~1~|~01/SAE~|~Pavement markings on various Medina County roads. 109408~|~1~|~1~|~01/SAF~|~District wide raised pavement markers. 116661~|~1~|~1~|~01/NFA~|~Not on Federal Aid System - Plan Split 116661~|~1~|~2~|~02/S5K~|~STP>5 Plan Split 116661~|~1~|~3~|~03/STR~|~Rural Plan Split 113423~|~1~|~1~|~01/NHS~|~New signal at MAH SR 11 southbound ramp at Mahoning Ave 113423~|~1~|~2~|~02/S>2~|~New signal at MAH SR 170 at Lake Park Drive. 107902~|~1~|~1~|~01/SAE~|~Construction of sidewalk on the north side of the Dayton Yellow Springs Road bridge over Beavercreek. 107902~|~1~|~2~|~02/BRO~|~Split for the rehabilitation cost (100% locally funded) for the bridge carrying Dayton Yellow Springs Road over Beaver Creek. 77370~|~1~|~8~|~08/MPO~|~MORPC/Columbus funding for landscaping (Main St bridge), brick paver sidewalks, additional pvmt widening on Mound & Fulton for bike lane 77370~|~1~|~7~|~07/IMS/AEP~|~100% AEP funded utility items 77370~|~1~|~9~|~09/IMS/COL~|~100% City of Columbus items for brick crosswalks, electrical work 77370~|~1~|~1~|~01/IMS~|~Placeholder plan split for IM funding 77370~|~1~|~2~|~02/NHS~|~Placeholder plan split for NH funding 77370~|~1~|~3~|~03/IMS~|~Placeholder plan split for IM funding for bridge replacement, no added capacity: 77370~|~1~|~4~|~04/NHS~|~Placeholder plan split for NH funding for bridge replacement with capacity 77370~|~1~|~5~|~05/IMS~|~Placeholder plan split for IM funding for new bridge construction and retaining walls 77370~|~1~|~6~|~06/IMS~|~IM funding for project eligible utility items: water, sanitary, electric, traffic surveillance 113634~|~1~|~1~|~01/S>2~|~The project will widen SR 741 between Cox-Smith Road and Spyglass Hill to include two lanes of travel in each direction with left turn lanes at all intersections. The project will also include signal improvements at Cox-Smith Road and Stone Ridge Drive with back plates, street trees, street lighting, a shared use path, sidewalk and right turn lanes. 101583~|~1~|~1~|~01/S<2~|~DSR# JEF-018 95525~|~1~|~1~|~01/IMS~|~Remove and replace concrete overlay, patch curbs, abutments and parapet, structural steel repair, refurbish bearings, paint superstructure and various other bridge repairs. CLA-70-0826, SFN 1204084, CLA-70-0970, SFN 1204114, CLA-70-1024, SFN 1204149 113442~|~1~|~1~|~01/NHS~|~Major rehabilitation pavement work on COS-36 and TUS-36 from SLM 0.00 to SLM 3.67. 113442~|~1~|~2~|~02/STR~|~Major rehabilitation of TUS-36 pavement from SLM 3.67 to SLM 3.85. 101695~|~1~|~1~|~01/STR~|~Resurfacing and related work. 102837~|~1~|~1~|~01/IMS~|~Applying smooth seal to Interstate route 102837~|~1~|~2~|~02/S>2~|~Applying smooth seal to STP > 200k routes 102837~|~1~|~3~|~03/STR~|~Applying smooth seal to various STP Rural routes 121379~|~1~|~1~|~01/NHS~|~Plan Split for Urban Paving funded scope on SR-184 121379~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope on SR-184 (full-depth repairs), scope on Alexis Rd (not on SR 184) to Suder Ave, and sidewalks 98119~|~1~|~2~|~02/S<2/MAR~|~STP<200 Urban Paving Marion SLM: 7.46 to 8.5 98119~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.00 to 7.46; 11.37 to 16.37 113175~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing of Ravenna Rd from Old Mill Rd to Portage County Line, a portion in the City of Hudson. 88297~|~1~|~1~|~01/NFA~|~Plan Split for normal project costs for Fifth Ave oil separator, D6 4MA7 (facility) funding. 93788~|~1~|~1~|~01/STR~|~Replace SFN 3600300Located 3.00 miles east of Leesburg on SR28. It it proposed to replace the deficient structure. 80/20 split01/STP/BR/State 92371~|~1~|~1~|~01/NHS~|~Resurfacing plan split 119171~|~1~|~1~|~01/STR~|~Rural Plan Split 98117~|~1~|~2~|~02/STR~|~Spot Paving throughout District 11. 98117~|~1~|~1~|~01/STR~|~Spot paving locations in the Village of Scio. 101140~|~1~|~1~|~01/STR~|~Bridges 105734~|~1~|~1~|~01/NHS~|~Plan Split 1 for federally funded items 105734~|~1~|~2~|~02/S>2~|~Plan Split 2 for 100% local items 106645~|~1~|~1~|~01/S<2~|~Provide a pedestrian walk/bike way from Scott St. along McKinley Road to U.S. Rt. 33, crossing 33 with a 2-span pedestrian bridge and ending at the parking lot of the St. Marys Middle\High School. 106645~|~1~|~2~|~02/SAF~|~Anti-Graffiti Coating 106645~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 101465~|~1~|~1~|~01/NFP~|~Crack Seal 83323~|~1~|~1~|~01/BRF~|~REPLACE STRUCTURALLY DEFICIENT TWO-LANE BRIDGE WITH THREE-LANE STRUCTURE, INCLUDING ASSOCIATED INTERSECTION AND APPROACH IMPROVEMENTS SFN 5761492 MMOTMR **C : 0.000 : 0.000 124556~|~1~|~1~|~01/S>2~|~Rubblize and resurface. 124556~|~1~|~2~|~02/STR~|~Rubblize and resurface. 114223~|~1~|~1~|~01/IMS~|~Guardrail repairs/replacements on various routes in District 4. 101348~|~1~|~1~|~01/STR~|~bridge repl. 102013~|~1~|~1~|~01/NHS~|~Split for work on Richmond Rd north of Chagrin (NHS). 102013~|~1~|~2~|~02/NFP~|~100% local participation for items of work that is not eligible for federal-aid 79207~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 50 0945 (SFN 0501506), ATH 50 0945 RT (SFN 0501522), ATH 50 1184 LT (SFN 0501468) and RT (SFN 0501514). NHS route funded Federal 80% and State 20%. 105535~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MAD-71-4.50-4.56 105535~|~1~|~2~|~02/NHS~|~Priority System NHS Plan Split: MAR-23-10.62-19.97 PIC-23-22.63-23.16 105535~|~1~|~3~|~03/NHS~|~General System NHS Plan Split: PIC-23-16.94-17.33 105535~|~1~|~4~|~04/STR~|~Rural Plan Split: UNI-245-0.00-7.02 UNI-739-2.63-5.94 105535~|~1~|~5~|~05/S<2~|~Urbanized Area Plan Split: UNI-245-7.02-7.50 92382~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PS7(100% State) - No CAP - Bridge rehabilitation on 6002196 MUS SR60 28.87 Intersect: Over Big Run; BR Eligible: Length=67 SD/FO(1) SR=64.3 DSR=4 111407~|~1~|~1~|~01/NFP~|~FY 21 Herbicidal Spray 115055~|~1~|~1~|~01/NHS~|~Plan split to program project, update at project scoping. 99389~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for construction of a salt storage building near the Village of Amanda on US 22. 110589~|~1~|~2~|~02/NHS~|~Culvert replacements. 110589~|~1~|~3~|~03/S>2~|~Culvert replacement. 110589~|~1~|~1~|~01/SAF~|~Installing Restricted Crossing U-Turn (RCUT) at the TRU US 62 and Bedford Rd intersection. 98382~|~1~|~1~|~01/NFA~|~Road Improvements to support expansion by Ohio National Financial located at One Financial Way and Pfieffer Road 113021~|~1~|~1~|~01/STR~|~All work on the project is included in this split. Funded with safety funds SAC 4HJ7 (at 90%) and SAC 4BC7 (at 10%). 95315~|~1~|~1~|~01/CMQ~|~Interconnection of existing traffic signals along Indian Ripple Road (between Greene Dr. and North Fairfield Rd.) and North Fairfield Road (between Indian Ripple Rd. and Jonathon Dr.) with fiber optic cable, and connection to the existing fiber optic system that currently terminates at Jonathon Drive. In addition, controller upgrades and reconstruction of the existing signals at Indian Ripple Road and Grange Hall Road, and North Fairfield Road and Shakertown Road to mast arm signals. 95665~|~1~|~1~|~01/S>2~|~Bike path in Rossford. 98403~|~1~|~1~|~01/STR~|~CRA-96-0.00-11.42 Resurfacing 101497~|~1~|~1~|~01/STR~|~DSR# BEL-018 101608~|~1~|~2~|~02/S<2~|~District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-541-17.79 to 18.72 101608~|~1~|~3~|~03/NFA~|~District Preservation 7BPB/4PS7(100% State) - See CAP Comments - Resurfacing of Cos-206-00.00 to 03.37 101608~|~1~|~1~|~01/STR~|~District Preservation Funding 4PF7(80% Federal) / 7BPB/4PS7(20% State) - See CAP Comments - Resurfacing with related work on Cos-541-08.73 to 17.79 and Cos-541-23.63 to 29.48 91619~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (COL-344-0666, SFN 1505041) with a new bridge. Bridge type to be determined by performing a feasibility analysis for structure type. 92254~|~1~|~3~|~03/STR~|~"03/STR/OT/ " - District Preservation 4MP7(100% State) - No CAP - Striping and Raised Pavement Markings on GUE SR513 0-14.74 92254~|~1~|~5~|~05/STR~|~"05/STR/OT/ " - District Preservation Culverts 4CW7 (Federal 80%) / 4CV7 (State 20%) - No CAP - Drainage repair work within Quaker Village on 1) Gue-SR 513-01.88 to 02.02; 2) Gue-SR 265-13.64 to 13.76; 92254~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation 4MP7(100% State) - No CAP - Resurfacing on GUE SR761 0-2.43 92254~|~1~|~2~|~02/NFA~|~"O2/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on GUE SR761 0-2.43 92254~|~1~|~1~|~01/STR~|~"O1/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on GUE SR513 0-14.74 102987~|~1~|~2~|~02/IMS~|~Plan Split for the Rural sections of the project. This includes CLi-71 and a portion of WAR-71 between SLM 9.8-14.2 102987~|~1~|~1~|~01/IMS~|~Plan split for the Urban sections of the project. This includes a portion of WAR-71 between SLM 8.42-9.8 114320~|~1~|~1~|~01/NFA~|~Created for ODOT J&C funding 122081~|~1~|~1~|~01/MPO~|~TLCI Items 96883~|~1~|~1~|~01/NFP~|~Construction of two Dynamic Message Signs (DMS) in Jackson and Liberty Townships, Mahoning and Trumbull Counties, Ohio. 107070~|~1~|~1~|~01/SAF~|~Build a single-lane roundabout at State Route 162 in Montville 107070~|~1~|~2~|~02/SAF~|~The Medina County Sewer District water line relocation work. 107070~|~1~|~3~|~03/SAF~|~Ongoing Consultant Services during Construction 122982~|~1~|~1~|~01/STR~|~added plan split. 98572~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement 118328~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at ASD-42-13.40/SR-89 103427~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 115016~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 91945~|~1~|~1~|~01/STR~|~Resurfacing eligible for rural STP funds. Section of SR 231 classified as a Rural Major Collector from 7.77 to 10.36. 80% SAC 4PF7 20% SAC 4PS7. 91945~|~1~|~2~|~02/NFA~|~Resurfacing on road not eligible for federal funds. Section of SR 231 classified as a Rural Minor Collector from 10.36 to 17.87. 100% SAC 4PS7. Federal funds cannot be used to resurface Rural Minor Collectors. 120078~|~1~|~1~|~01/STR~|~added plan split. 104250~|~1~|~1~|~01/ENH~|~Streetscape using Small City funds at 95% Federal 4B97/5% Local LNTP; TAP funds at 80% Federal 4B37/20% Local LNTP; 100% Local LNTP. 114051~|~1~|~1~|~01/ERD~|~The construction and extension of multipurpose trails throughout Lake County using OH175 & OH392 Earmarks. 90884~|~1~|~2~|~02/STR~|~Culvert Replacement / cfn:036040015 ASD-604-01.91 90884~|~1~|~1~|~01/STR~|~Bridge (<20' Length) Repair : WAY-301-0517 (SFN 8505101) 101977~|~1~|~1~|~01/SAF~|~Intersection improvement at POR SR 14 at Tallmadage Road. 122373~|~1~|~1~|~01/NHS~|~Plan split for CMAQ eligible traffic signal and pedestrian improvements 119754~|~1~|~1~|~01/SAF~|~Various pedestrian improvements at 6 locations across the City of Cincinnati including sidewalk, raised crosswalks, curb bump-outs, and ADA curb ramps. 78711~|~1~|~1~|~01/ENH~|~"01/ENH/OT/MUSK" - Muskingum County Park District project - Funding has been uncommitted due to inactivity by the local. 90718~|~1~|~1~|~01/STR~|~Geotech Funds - 80/20 - Slip Repair 95475~|~1~|~1~|~01/S>2~|~Resurface Ravenna Road using 80% federal MPO STP funds with 20% local matching funds. 90865~|~1~|~1~|~01/ENH~|~Installation of new sidewalks along Haskett and Hamilton Streets in West Milton. 112954~|~1~|~1~|~01/STR~|~BRO 505 0.00-6.72 112954~|~1~|~2~|~02/STR~|~Bridge preventative maintenance. 112954~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 98100~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. WAR-CR 45-4.64 (SFN: 8331855) including replacement of the existing superstructure, and minor substructure repairs. 121671~|~1~|~1~|~01/S5K~|~Resurfacing STP 5,000-49,000 121671~|~1~|~2~|~02/STR~|~Resurfacing STP Rural 88801~|~1~|~1~|~01/NHS~|~100% City of Ashland 88801~|~1~|~2~|~02/NHS~|~District Allocation 88801~|~1~|~3~|~03/NHS~|~Urban Paving - 80/20 - District Allocation/City of Ashland 88801~|~1~|~4~|~04/NHS~|~SFN: 0305138 ASD-250-24.02 Bridge Work 107779~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 26 14.87-14.91. 100% Federal ER funded. 121597~|~1~|~1~|~01/S>2~|~Resurfacing 79762~|~1~|~1~|~01/IMS~|~90/10 District Allocation 79762~|~1~|~3~|~03/IMS~|~Bridge Work for Two Structures Less Than 20 ft. SFN 4705130 (LOR-90-22.01 L) SFN 4705165 (LOR-90-22.01R) 79762~|~1~|~2~|~02/IMS~|~Bridge Work: LOR-90-18.61 (L&R) / LOR-90-21.70 / LOR-90-22.80 (L&R) 119741~|~1~|~1~|~01/NFA~|~Creating Plan Split for TED Involvement 119291~|~1~|~1~|~01/NFA~|~CEAO LBR BFP project funded 85524~|~1~|~1~|~01/IMS~|~90/10 project funding split with federal IM funds. 108828~|~1~|~1~|~01/STR~|~Culvert replacements. 108828~|~1~|~2~|~02/S<2~|~Culvert replacements. 95999~|~1~|~1~|~01/IMS~|~SFN 4807952 103257~|~1~|~1~|~01/NFA~|~AC Overlay with repairs 103257~|~1~|~2~|~02/STR~|~AC overlay without repairs 124262~|~1~|~1~|~01/S50~|~All work included in this plan split. 99579~|~1~|~1~|~01/MPO~|~Resurfacing Western Reserve Road (CR-32) from Hitchcock Road to Tippecanoe Road. 88761~|~1~|~2~|~02/BRO~|~Bridge Repair 88761~|~1~|~1~|~01/STR~|~Resurfacing 122318~|~1~|~1~|~01/BRO~|~Plan split to program project, updated when scope of work is complete. 88561~|~1~|~1~|~01/STR~|~OC 99999 - SR 66 SLM 3.21 to 4.36 - Overlay with asphalt concrete. 88561~|~1~|~2~|~02/S>2~|~OC 99759 - SR 66 SLM 2.49 to 3.21 - Overaly with asphalt concrete. 88561~|~1~|~3~|~03/S<2~|~OM 99759 - SR 66 SLM 1.51 to 2.49 - Overlay with asphalt concrete. 88561~|~1~|~5~|~05/STR~|~OM 99999 - SR 48 SLM 4.49 to 5.29 - Overlay with asphalt concrete. 88561~|~1~|~4~|~04/NHS~|~NM 22528 - SR 48 SLM 3.58 to 4.26 - Overlay with asphalt concrete. 88561~|~1~|~6~|~06/S<2~|~OM 22528 - SR 48 SLM 4.26 to 4.49 - Overlay with asphalt concrete. 116945~|~1~|~2~|~02/STR~|~Bridge work to be included with AC Overlay project 116945~|~1~|~1~|~01/STR~|~AC Overlay w/ RepairsASD-604-0.00 to 3.378 116945~|~1~|~3~|~03/IMS~|~Expansion Joint repair and deck grinding for SFN 0306126 87586~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing portions of Cos-USR 36-(19.71-33.59), and Kno-SR 13-(16.05-20.74). 87586~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Crack Sealing portions of Cos-SR 651-(00.00-02.84), Cos-SR 651-(02.84-03.04), Gue-USR 40-(16.19-16.62), Gue-SR 285-(04.51-07.92), Gue-SR 313-(09.91-21.02), Hol-SR 651-(00.00-00.50), Kno-SR 95-(00.00-05.69), Nob-SR 313-(00.00-01.24) 87586~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Crack Sealing potions of Cos-SR 643-(00.00-10.87), Gue-SR 285-(08.35-13.46), and Gue-SR 313-(02.23-09.91) 115597~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 100079~|~1~|~3~|~03/NFA~|~Paved Invert of a Culvert on Home Road for City of Mansfield. 100079~|~1~|~4~|~04/NFA~|~City of Ontario Paved invert for a Culvert under Home Road. 100079~|~1~|~1~|~01/S<2~|~RIC US 0042-16.32Minor RehabilitationCulvert invert repair (120) 100079~|~1~|~2~|~02/S<2~|~RIC SR 0430 02.18 SFN (7006098) and RIC SR 0430 05.35Minor Rehabilitation 96394~|~1~|~1~|~01/NFA~|~Pedestrian improvements and intersection and signal upgrades at three intersections near the Howland Middle School. Trumbull County, Ohio. 92877~|~1~|~2~|~02/BRF/LON~|~100% London cost for relocating water line 92877~|~1~|~1~|~01/BRF~|~BR eligible federal/local bridge replacement in LondonSFN 4960726, Toland St over Oak Run01/BRF/BR/ 109569~|~1~|~1~|~01/NHS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for SR 7, SR 11 and US 30 in Columbiana County. 109569~|~1~|~2~|~02/IMS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for IR 77 in Tuscarawas County. 109650~|~1~|~1~|~01/NHS~|~Resurfacing BEL-7 109650~|~1~|~2~|~02/STR~|~Resurfacing SR 148 in Powhatan Point 124968~|~1~|~1~|~01/NFP~|~Provide mowing and litter pick up on various routes 90892~|~1~|~1~|~01/NHS~|~District Allocation 80/20 124715~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation of federally eligible interstate bridge 85393~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 85393~|~1~|~2~|~02/MPO~|~Improve pedestrian and bicycle safety by providing sidewalk bump-outs and crosswalk enhancements utilizing MPO STP @ 80% federal participation with 20% TRC. 85393~|~1~|~3~|~03/NFP~|~Work items that is not eligible for federal-aid 82913~|~1~|~2~|~02/STR~|~Minor Bridge work on SFN 6701663 POR-SR 44-21.98 over the Cuyahoga River, not BR eligible. 82913~|~1~|~1~|~01/STR~|~Resurfacing of State Route 44 from SLM 19.16 to SLM 22.14 in Shalersville Township and the Village of Mantua, Portage County, Ohio. 82913~|~3~|~5~|~05/ENH~|~Installation of sidewalks on West side of State Route 44, in the Village of Mantua, Portage County, Ohio. 82913~|~2~|~4~|~04/STR~|~Plan Split for the relocation of sanitary line. 82913~|~2~|~3~|~03/BRO~|~Replacement of SFN 6701620 POR-SR 44-21.80 over a branch of the Cuyahoga River, in the Village of Mantua, Portage County, Ohio. 104623~|~1~|~1~|~01/SAF~|~All work to construct roundabout to station 241+18.53 except surface course and culverts 104623~|~1~|~2~|~02/STR~|~All work north of station 241+18.43 except culvert, plus surface course on entire project 104623~|~1~|~3~|~03/STR~|~Replace two culverts at DEL-61-0474 and DEL-61-0493 79864~|~1~|~3~|~03/S>2~|~Replacement and widening of sfn# 5004888, MAH-224-19.80 structure over Yellow Creek. 79864~|~1~|~1~|~01/BRO~|~Replacement and widening of sfn#5004853. MAH-US224-19.65 over IR-680. 79864~|~1~|~2~|~02/S>2~|~Resurfacing of US-224 from slm 19.50 to 20.00. 124393~|~1~|~1~|~01/S5K/COSH~|~Improvement to pedestrian facilities. 112224~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract at various locations 107596~|~1~|~1~|~01/NFA~|~Intersection improvement SR 164/Esterly Drive; 100% ORDC federal funds up to cap. 79664~|~1~|~2~|~02/NHS~|~Patching & sealing on 14 structures (not BR eligible): 79664~|~1~|~1~|~01/NHS~|~Priority system resurfacing from Little Turtle Way to Blacklick Creek 91919~|~1~|~2~|~02/SAF~|~Signal & Cabinet Upgrades with D6 state preservation funding 91919~|~1~|~3~|~03/SAF~|~100% 4BC7 safety funding for signal heads and detection for PIC-23/Dupont intersection 91919~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. funds for 1 year Electric Maintenance Contract 97711~|~1~|~1~|~01/S<2~|~Replacement of SFN 0460664 North Avenue Bridge over Cowles Creek in the City of Geneva. 118866~|~1~|~1~|~01/STR~|~All items of work from SLM 0.30 to 6.82 118866~|~1~|~2~|~02/S5K~|~All items located in SLM 6.816 to 7.59. 97649~|~1~|~1~|~01/BRF~|~4860187 97649~|~1~|~2~|~02/NFP~|~This split is for the relocation of the 2 waterlines. 107577~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement project for FY2024. 80/20% Federal/State funds. 107577~|~1~|~3~|~03/NHS~|~Guardrail upgrade/replacement project for FY2024. 80/20% Federal/State funds. 107577~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement project for FY2024. 100% State funds. 107577~|~1~|~1~|~01/S5K~|~General System Guardrail replacement project for FY2024. 80/20% Federal/State funds. 117826~|~1~|~2~|~02/STR~|~Split for bridge work on the rural STP system 117826~|~1~|~3~|~03/S>2~|~Split for bridge work on the urban STP system 117826~|~1~|~1~|~01/NHS~|~Split for work on bridge rehabilitation on interstate bridges 103664~|~1~|~1~|~01/NFA~|~Plan split 109260~|~1~|~1~|~01/NFP~|~Crack sealing of various routes throughout the district. 106724~|~1~|~1~|~01/BRF~|~Replacement of the existing King Avenue bridge over the Little Miami River, upstream from the existing WAR-CR 282-0.97 structure. Improvement to the approach roadway including grade separating the approach roadway from the Little Miami Scenic Trail crossing. 106724~|~1~|~2~|~02/NFP/UTIL~|~Plan split is for waterworks and sanitary sewer improvements, being funded 100% by the utility companies. 96500~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/OT/CAMB" SRTS City of Cambridge project for installation of sidewalk. Fund $160,000 84587~|~1~|~1~|~01/NHS~|~Bridge Maintenance 88614~|~1~|~1~|~01/S<2~|~Replace bridge (not eligible for BR replacement funds):SFN 800360, UNI-31-0.23, Mill Ck 96211~|~1~|~1~|~01/STR~|~Replace structure over Sylvester Run 76147~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project. ATH 682 2.15-2.97, 4.72-5.89, and ATH 691 8.78 -8.92 with a fine graded polymer treatment. ATH 682 2.97-4.72, 5.89-6.14 with an asphalt overlay treatment. Funded 80 federal/20 state. 76147~|~1~|~2~|~02/STR~|~Two-lane resurfacing project. ATH 691 3.43-8.78 with a fine graded polymer treatment. ATH 691 0.00-3.43 with an asphalt overlay treatment. Funded 80 federal/20 state. 102684~|~1~|~1~|~01/NFP~|~All work in this project. 97972~|~1~|~1~|~01/BRO~|~Rehabilitation of Bridge COL-30-3004 (SFN 1502166) over US 30, by replacing deck, painting steel and repairing Pier columns. 119770~|~1~|~1~|~01/STR~|~Replacement of existing structure (KNO-62-19.08) 117239~|~1~|~1~|~01/S>2~|~Subgrade and base roadway 117239~|~1~|~2~|~02/S>2~|~Surface pavement course 87616~|~1~|~2~|~02/NFA~|~100% local funding for all work not eligible for the earmark. 87616~|~1~|~1~|~01/ERD~|~o OH392 is for the construction of the pedestrian bridge onlyo OH175 is for the construction and extension of multipurpose trails throughout Lake County (which includes the construction of a pedestrian bridge). 100351~|~1~|~2~|~02/S<2~|~Overlay SR 47 in Darke County with fine graded aggregate.SR 47 SLM 0.79 - 1.65 100351~|~1~|~1~|~01/STR~|~Overlay USR 36 and SR 47 in Darke County with fine graded aggregate.USR 36 SLM 0.00 - 3.35 and 3.63 -8.35SR 47 SLM 1.65 - 10.07SR 47 SLM 10.51 - 11.05 98078~|~1~|~1~|~01/MPO~|~Widen CR 281 (Trimble Rd) from CR 134 (Cook) to CR 146 (Marion) from 2 lanes to 4/5 lanes. 98078~|~1~|~2~|~02/SAF/Mans~|~90/10 Safety items at intersections. 107565~|~1~|~1~|~01/NFP~|~Maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district. 96356~|~1~|~1~|~01/SAF~|~Provide shared use path along Upper Bellbrook from Feedwire to Kable's Mill. Improve existing PED connection from Rose Lake Drive to the Bellbrook school campus. 91012~|~1~|~1~|~01/BRF~|~Anderson Morris CR46 SFN 7837658 0.92-0.93 over squaw creek 107708~|~1~|~2~|~02/STR~|~Plan split for FUL-2-0506 replacement 107708~|~1~|~1~|~01/STR~|~Plan split for resurfacing of SR 2, SR 66 115305~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 14821~|~1~|~1~|~01/MPO~|~City of Brunswick 14821~|~1~|~2~|~02/ENH~|~100% Local Funded items 99796~|~1~|~1~|~01/NFP~|~Replacing the following culverts; CFN 045310360 ATB-531-12.41 and CFN 045340130 ATB-534-04.64 112702~|~1~|~1~|~01/NHS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for US 250 in Tuscarawas county. 112702~|~1~|~2~|~02/S<2~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for US 36 in Tuscarawas County. 116539~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing, includes alternate bid items. 93757~|~1~|~1~|~01/STR~|~01/STR/BR/ ; PUT-694-0872, SFN 6902049; 100% State funds - No Cap. 117712~|~1~|~1~|~01/SAF~|~Plan split for safety 117712~|~1~|~3~|~03/BRO~|~Plan split for aesthetic enhancements for HEN-24-0043 bridge. 100% local participation. 117712~|~1~|~2~|~02/BRO~|~Plan split for new HEN-00024-0043 bridge 104707~|~1~|~1~|~01/NHS~|~Bridge painting project. MEG 7 2.43 (SFN 5300037) and MEG 7 2.63 (SFN 5300061). NHS route funded 80 federal/20 state. 104707~|~1~|~2~|~02/STR~|~Bridge painting project. MEG 124 47.86 (SFN 5301718). Rural other federal aid funded 80 federal/20 state. 113815~|~1~|~1~|~01/STR~|~Major Rehabilitation Funds - 5MT7 (80% Federal) / 4MT7 (20% State) - No CAP - FDR Rehabilitation with related work on: 1) COS-SR 229-0.00 to 0.70; 2) KNO SR 229 14.41 to 25.38 120480~|~1~|~1~|~01/NFA/AKRO~|~Bridge replacement. 120480~|~1~|~2~|~02/NFA/AKRO~|~Installation of sidewalks. 114326~|~1~|~1~|~01/MPO~|~Construction of bike facilities on Central Parkway from Marshall to Ludlow. 86276~|~1~|~3~|~03/S<2~|~General System - Urbanized Area - 80/20 4PF7/4PS7 86276~|~1~|~2~|~02/S<2/LOR~|~City of Lorain Urban Paving - 100% City Responsibilty 86276~|~1~|~1~|~01/S<2/LOR~|~City of Lorain Urban Paving - 80/20 4PF7/4BG7 105491~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the Superstructure and Pier repair on SFN 6001653, Mus-SR 60-07.62 114414~|~1~|~2~|~02/S5K~|~Resurfacing inside the Ottawa Glandorf Urban Area but outside of the villages. Work on CR Old US 224 from 1.181 to 1.744. 80% federal funds from CEAO with the 20% match provided by Putnam County. After the cap is reached the funds will be provided 100% by Putnam County. 114414~|~1~|~1~|~01/STR~|~Resurfacing outside of the Ottawa Glandorf Urban Area. All work on CR Z. 80% federal funds from CEAO with the 20% match provided by Putnam County. After the cap is reached the funds will be provided 100% by Putnam County. Some work is in the Village of Columbus Grove. The County will pay for the project and then bill the Village for their portion. 114414~|~1~|~3~|~03/NFA~|~Resurfacing outside of the Ottawa Glandorf Urban Area on CR Old US 224 from 1.744 to 4.106. 80% federal funds from CEAO with the 20% match provided by Putnam County. After the cap is reached the funds will be provided 100% by Putnam County. Some work is in the Village of Columbus Grove. The County will pay for the project and then bill the Village for their portion. Rural Minor Collector. 110460~|~1~|~1~|~01/SAE~|~Improve sight distance on SR-177 by improving the vertical curves on northbound and southbound SR-177 approaching the Oxford Germantown intersection. 120369~|~1~|~1~|~01/BRF~|~Replacement of existing deteriorated superstructure on WAR 147 Grog Run Road SFN 8333076 98833~|~1~|~1~|~01/IMS~|~Split for lighting upgrade 98833~|~1~|~2~|~02/NHS~|~Work on US-422 123941~|~1~|~1~|~01/MPO~|~Plan split for federally eligible NOACA Carbon Reduction Program funded work items. 94123~|~1~|~5~|~05/S>2~|~Resurfacing of SUM SR 585 from 0.00 to 1.28 and WAY SR 585 from 18.47 to 18.63. 94123~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span. 94123~|~1~|~2~|~02/NHS~|~Resurfacing of SUM SR 21 from 0.00 to 5.14. 94123~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span. 94123~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span. 94123~|~1~|~6~|~06/S>2~|~Minor bridge work > 20' span. 94123~|~2~|~7~|~07/SAF~|~Installation of RCUT on WAY/SUM SR 585 and Eastern Rd. 106433~|~1~|~2~|~02/S<2/CAMB~|~Transportation Alternative Funding 4B37 (80% Federal) / LNTP (20% Federal - See CAP Comment - Gue CR 503 00.00 to 00.72 Stuebenville Avenue from N 5th Street to Highland Avenue: sidewalks, ADA Ramps; Decorative lighting. 106433~|~1~|~1~|~01/S<2/CAMB~|~City of Cambridge Small City Program funding - 4B97 (80% Federal) / LNTP (20% Local) - See CAP Comment - Reconstruction of Gue CR 503 00.00 to 00.72 (Steubenville Avenue) 99853~|~1~|~1~|~01/MPO~|~Replacement of SFN 7631928 Gambrinus Ave SW bridge over the Wheeling & Lake Erie RR and Hurford Run. 95604~|~1~|~1~|~01/NHS~|~JAC US 35 8.35-11.00 121594~|~1~|~1~|~01/MPO/BARB~|~Resurfacing. 121047~|~1~|~1~|~01/S>2~|~bridge overlay plan split. 101153~|~1~|~1~|~01/STR~|~Smooth seal on rural route: DAR SR 49 SLM 19.03 to 23.28 101153~|~1~|~2~|~02/S<2~|~Smooth seal on small urban route: DAR SR 49 SLM 18.38 to 19.03. 101153~|~1~|~3~|~03/NHS~|~AC Overlay with repairs:DAR SR 49 SLM 12.22 to 15.25 114355~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (1000% State) - NO CAP - Annual Project for the Application of Epoxy Pavement Markings District Wide. 116997~|~1~|~1~|~01/NHS~|~test 97204~|~1~|~1~|~01/ENH~|~Construction of a five foot concrete sidewalk on the south/west side of Yankee Road from Cincinnati Dayton Road to tie into the existing concrete walk installed by Royal Redeemer Lutheran Church. New walk will continue on the south side of Dutchland Parkway from Yankee Road to the existing crosswalk at Dutchview Court (between the Liberty Junior High School and Woodland Elementary School). 124096~|~1~|~1~|~01/IMS~|~Plan split to perform geotechnical stabilization of a landslide along the interstate 109480~|~1~|~1~|~01/S>2~|~Trail maintenance 108891~|~1~|~1~|~01/BRF~|~Bridge Replacement 90950~|~1~|~1~|~01/NHS~|~Bridge Repair: HUR-18-25.15 90950~|~1~|~2~|~02/STR~|~Misc. Bridge Repairs: HUR-162-9.80 / HUR-162-9.90 95908~|~1~|~1~|~01/STR~|~Bridge deck replacement project. GAL 77 0930 (SFN 2704684). Work includes steel beam repair and bridge painting. Other federal aid funded 80 federal/20 state. 102953~|~1~|~1~|~01/S>2~|~STP > 200000 eligible. 77813~|~1~|~1~|~01/NHS~|~Overlay and perform minor maintenance of Bridge Nos. HAM-22-0091 R, SFN 3100766, and HAM-22D-0007 L, SFN: 3100294. 109735~|~1~|~1~|~01/S>2~|~Plan split for work on HAM-22 108525~|~1~|~1~|~01/BRO~|~Replace existing non-composite box beam superstructure with new composite box beam superstructure for HOL-83-1197 (SFN 3801772). Replace beam seats and bearings. Provide new approach slabs. 94390~|~1~|~3~|~03/IMS~|~Bridge Work (interstate):SFN 0305278 ASD-71-13.68 94390~|~1~|~1~|~01/STR~|~General System Resurfacing - Rural 94390~|~1~|~2~|~02/STR~|~Bridge work (stp rural):SFN 0305200 ASD-302-0.89SFN 0305235 ASD-302-1.53SFN 0305294 ASD-302-5.63SFN 0305340 ASD-302-9.34SFN 0305405 ASD-302-14.39 117368~|~1~|~1~|~01/BRF~|~Added plan split. 100506~|~1~|~1~|~01/STR~|~Resurfacing HOL-60 from Killbuck to SR 39, including asphalt overlay, pavement repairs and pavement markings. 123720~|~1~|~1~|~01/IMS~|~Plan split for resurfacing interstate 122731~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 122731~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded scope, such as any work on Convent Blvd that is not necessary for the construction of the roundabout. 121260~|~1~|~1~|~01/S>2~|~Resurfacing STP >200,000 121260~|~1~|~2~|~02/STR~|~Resurfacing STP Rural 94814~|~1~|~1~|~01/S<2~|~Reconstruct and resurface Belmont from Mitchell to Home Rd. SLM 01.83 to SLM 02.62 CR 502 108868~|~1~|~1~|~01/STR~|~Bridge Split for San-6-23.58 replacement 92066~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/OT/LANC" - City of Lancaster intersection improvement project utilizing STP funding through Large City Program. 110614~|~1~|~1~|~01/S>2~|~Split for paving work on the STP system. 110614~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 96410~|~1~|~1~|~01/IMS~|~The location was identified as a wet pavement crash location. Skid testing was completed and milling sections with low skid numbers recommended. 92756~|~1~|~1~|~01/NFA~|~CO CC 01 added plan splits. This is maintenance funds (4CP7) 100% state. 116591~|~1~|~1~|~01/NHS~|~Bridge rehabilitation for NHS bridges. 116591~|~1~|~2~|~02/S50~|~Bridge rehabilitation for Other federal Aid bridges, 50,000-200,000. 116591~|~1~|~3~|~03/S5K~|~Bridge rehabilitation for Other federal Aid bridges, 5,000-50,000 116591~|~1~|~4~|~04/STR~|~Bridge rehabilitation for Other federal Aid bridges, rural 91889~|~1~|~1~|~01/NHS~|~Resurface and perform pavement repair on SR 4 in Greene County from the Montgomery County line to the Clark County line 90658~|~1~|~1~|~01/MPO~|~resurface Poe Rd in Bowling Green WOO CR78 4.06-6.07 92272~|~1~|~1~|~01/SAE~|~Apply edgeline and centerline pavement markings to various county routes in Clinton County. 97505~|~1~|~1~|~01/BRF~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). Off the federal aid system. Functional Classification Local. 91642~|~1~|~1~|~01/STR~|~LAW SR 650 6.40 Slide RepairProject Termini: On SR650, project is 6.40 miles north of its intersection with US52. Project Description: It is proposed to repair the slide under Federal Declaration 2011-02. 100% state 01/STR/OT/State 97844~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 1536974 103978~|~1~|~1~|~01/ENH~|~Construction of sidewalk along Elm Street in the Village of Racine. TAP funded project. Funded 80% federal, 15% credit bridge and 5% local. 107214~|~1~|~1~|~01/NHS~|~Improve intersections of DEL US 36/SR 37 at Lackey Old State Rd (DEL CR 10) and at North Old State Rd/Dunham Rd (DEL-CR 10 & 10A) 99671~|~1~|~1~|~01/STR~|~Milling and filling various routes with the county with asphalt concrete. 99671~|~1~|~2~|~02/NFA~|~Milling and filling various routes with the county with asphalt concrete. 109379~|~1~|~1~|~01/NFP~|~ODNR funded project at Monroe Lake - Slip Repair 98756~|~1~|~1~|~01/ENH~|~Rehabilitation of the Lunken Trail including correcting localized drainage issues by modifying existing drainage structures, re-grading drainage ditches, and installing curb and gutter along Wilmer Avenue. In addition, trail approaches to existing concrete driveways will be reconstructed. 88784~|~1~|~1~|~01/NHS~|~Urban Paving - 80/20 - District Allocation/City of Mansfield 88784~|~1~|~4~|~04/S<2~|~100% City of Mansfield 88784~|~1~|~3~|~03/NHS~|~100% City of Mansfield 88784~|~1~|~2~|~02/S<2~|~Urban Paving - 80/20 - District Allocation/City of Mansfield 99554~|~1~|~1~|~01/IMS~|~Split for resurfacing work at 90% fed and 10% state 102183~|~1~|~1~|~01/NHS~|~Removing southbound slip lane and island to provide standard right turn lane. 94217~|~1~|~1~|~01/S>2~|~Split to include all work associated with Bridge HAM-22-0619 over the Railroad and bridge HAM-22-0622 over SR 562. 117236~|~1~|~1~|~01/MPO~|~Resurfacing Wabash Cannonball Trail - MPO Transportation Alternatives (Enhancements) funding. 88400~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal funds 122045~|~1~|~1~|~01/SAF~|~Construct roundabout at the intersection of US 42 and SR 29 in Madison County 98142~|~1~|~1~|~01/BRF~|~SFN 7444125 105085~|~1~|~1~|~01/IMS~|~Bridge replacement with repairs on IR. 97906~|~1~|~1~|~01/CMQ~|~Wolf Creek Bikeway - The project consists of extending the Wolf Creek Trail along the south side of the Wolf Creek to Rosedale Drive. The trail would cross the Rosedale Drive bridge, then extend along the north side of Wolf Creek to Bridge Street to West Riverview Avenue. The trail would then be constructed in the West Riverview Avenue right-of-way to just west of Tennyson Avenue. The trail would then traverse on the street along West Riverview Avenue to Wesleyan Park. 91034~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split for all work using federal MPO STP funds. 108378~|~1~|~1~|~01/NFA~|~Landslide repair project. ATH 690 4.46-4.50. Non-Federal Aid Route (ATH_NF_0006). Funded 100% state ER funds. 117095~|~1~|~1~|~01/ENH~|~Shared used path in Piketon. 108133~|~1~|~1~|~01/MPO~|~Resurfacing of East Waterloo Road from Manchester Road to Kelly Avenue in the City of Akron. 119267~|~1~|~1~|~01/STR~|~Tree stump removal/pruning 86067~|~1~|~2~|~02/IMS/GAH~|~100% Local - All items associated with aesthetics for the Hamilton Rd Bridge 86067~|~1~|~1~|~01/IMS~|~Rehabilitation of 6 bridges over or under IR270 101088~|~1~|~1~|~01/S<2~|~This plan split is for the small urban route. 101088~|~1~|~2~|~02/STR~|~This plan split is for the rural routes. 120067~|~1~|~1~|~01/NFA~|~NEVI Round 2 275-B 106051~|~1~|~1~|~01/NHS~|~Pave culvert invert on GAL 35 15.70. NHS route funded 80 federal/20 state. 106051~|~1~|~2~|~02/STR~|~Bridge repair on GAL 233 6.38 (SFN 2703181). Rural other federal aid funded 80 federal/20 state. 118635~|~1~|~1~|~01/S50~|~Shave/Pave; Pavement Markings 124546~|~1~|~1~|~01/NFA~|~Created For ODOT TID involvement. 96680~|~1~|~1~|~01/NHS~|~Plan Split for all roadway/pavement work inthe project. Includes mainline and all ramps. Limits are GRE US 35 from SLM 0-3.08 96680~|~1~|~3~|~03/IMS~|~For repairs associated with the bridges carrying US 35 over I-675 96680~|~1~|~2~|~02/NHS~|~For all work associated with US 35, except for the bridges at the I-675 interchange. 96680~|~2~|~4~|~04/NHS~|~This plan split is for work on NHS bridges from Part 2 (PID 102792). 93959~|~1~|~1~|~01/SAF~|~Two-year guardrail repair (ding and dent) contract for FY 2018 and 2019. Funded 100% state. 97556~|~1~|~1~|~01/STR~|~Ohio Brdg Part. CR 4 SFN 4430328 97556~|~1~|~2~|~02/STR~|~Ohio Brdg Part. CR 6 SFN 4432002 97556~|~1~|~3~|~03/STR~|~Ohio Brdg Part CR 13 SFN 4432983 116890~|~1~|~1~|~01/S>2~|~Resurfacing 109342~|~1~|~1~|~01/NFP~|~Resurfacing work in Scioto Trail State Forest. 90140~|~1~|~1~|~01/STR~|~8603103 WIL SR576 12.9 Intersect: St Joseph River Overflow and culvert on WIL SR 2 11.05 106593~|~1~|~1~|~01/BRF/LCEO~|~CEAO LBR program 4B87 (80% Federal) / LNTP (20% Local [15% CB and 5% LNTP] - See CAP Comments - Replace bridge Lic-TR121-1.44 (SFN 4532619) 118765~|~1~|~1~|~01/NHS~|~added plan split. 119260~|~1~|~1~|~01/STR~|~Resurfacing. 93126~|~1~|~4~|~04/NHS~|~Minor bridge work to 10' to 20' structure. 93126~|~1~|~1~|~01/NHS~|~Resurfacing. 93126~|~1~|~2~|~02/S>2~|~Resurfacing. 93126~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance. 98320~|~1~|~1~|~01/STR~|~SCI 104 6.37-17.70SCI 348 6.70-12.80SCI 522 2.61-8.29 98320~|~1~|~2~|~02/S<2~|~SCI 522 1.83-2.61 120265~|~1~|~1~|~01/S>2~|~Plan split for federally eligible work items in the construction phase 114746~|~1~|~1~|~01/NHS~|~Double micro. 115354~|~1~|~1~|~01/MPO/NFRA~|~Resurfacing. 91601~|~1~|~1~|~01/STR~|~Brdg Replacement. Located 2.01 miles south of SR41 and SR781 intersection in Adams County 80 Fed/20 State. 01/STR/BR/State 124111~|~1~|~1~|~01/NFA~|~Bridge replacement project. HOC CR 361 0.03, SFN 3731693. 116190~|~1~|~1~|~01/STR~|~Bridge Replacement 96436~|~1~|~1~|~01/STR~|~Field pave inverts of corregated metal pipe arches. SFNs 1100971 (Treacle Creek) and 1101579 (Bull Branch). 124618~|~1~|~1~|~01/ENH~|~Programming project. 92847~|~1~|~1~|~01/BRF~|~Bridge replacement 110924~|~1~|~1~|~01/NFP~|~Culvert Replacement at WAY SR 0057 06.73, WAY US 0030 06.63 & 06.98. 97036~|~1~|~1~|~01/IMS~|~Culvert rehabilitaton at 90% federal/10% state 102204~|~1~|~1~|~01/SAF~|~Widening SR 44 for SB right turn storage lane and signal upgrade. 102204~|~1~|~2~|~02/SAE~|~Construction of Pedestrian crosswalk and ped head. 110255~|~1~|~1~|~01/MPO~|~Construction of a new sidewalk along West Stroop Road on the north side from Overland Trail to Southmoor Circle NW (no existing sidewalk in this section) 104254~|~1~|~1~|~01/NFP~|~Crack Seal Various Routes in District 3 123246~|~1~|~1~|~01/S5K~|~Reactive Maintenance, Spot Paving 100331~|~1~|~1~|~01/NFP~|~This is the district's annual auxiliary pavement marking maintenance project. 117357~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 164 over an unnamed tributary to Riley Run. 87276~|~1~|~1~|~01/STR~|~general system - minor rehabincludes: reconstruct outside 4' x 4" of shoulders; Structural overlay of surface 102929~|~1~|~1~|~01/STR~|~STP Rural funding eligible. 107929~|~1~|~1~|~01/STR~|~Resurface on SR18 outside the Fostoria urban area using district preservation funds From the Wood County line at 0.00 to TR 262 at 6.46. (80% Fed and 20% State). 107929~|~1~|~2~|~02/S<2~|~Resurface SR 18 inside of the Fostoria urban area but outside of the City of Fostoria. On both sides of the road from the Fostoria Urban Area at TR 262 at 6.46 to where the project ends where SR 18 enters the City of Fostoria on the left side at 6.89. All funds are from the District Preservation Program budget. (80% Federal and 20% State). No local funds. 113315~|~1~|~1~|~01/NFP~|~Rebuilding of the NB WAS 77 Rest Area as the Gateway to Ohio Welcome Center. Funded 100% State. 87854~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7. 114316~|~1~|~1~|~01/STR~|~Established Plan Split 1 - "01/STR/OT/ " 93982~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn TR225 (Shoemaker Road) 0.18 mile from SR124, it is proposed to replace the structure (SLM0.18) (SFN 6633072). 80% Fed/20% local01/NFA/BR/Pike 105377~|~1~|~1~|~01/NHS~|~Double mircosurface on NHS routes: AUG US 33 SLM 16.92 to 23.07 106281~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout ATB, MAH and TRU counties. 109433~|~1~|~1~|~01/IMS~|~Emergency A bridge expansion joint repair. 112417~|~1~|~1~|~01/IMS~|~Concrete Pavement Restoration 102736~|~1~|~1~|~01/NHS~|~This plan split is for bridge rehab on NHS bridges. 102736~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 83703~|~1~|~1~|~01/NFA~|~Bridge replacement project over the Little Musking River. WAS CR 14 0.06, SFN 8430403. CEAO funded project using Credit Bridge. 100093~|~1~|~1~|~01/BRO~|~Replacement of SFN 3831973; CR 23 over Mohican River. 122215~|~1~|~1~|~01/IMS~|~Resurfacing and related work on IR 70 in Guernsey County. Replace concrete pavement at ramp intersections at I-70/ S.R. 285 interchange. 121673~|~1~|~1~|~01/IMS~|~FRA-270-42.115 over ramp to IR 70 & US 40; replace deck 99752~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG CR 17 0.00-2.40. Not on any federal aid project funded 80 federal/20 local. 95107~|~1~|~1~|~01/ENH~|~Construction of 1.2 miles of walkway in the Village of Syracuse. Path will follow along SR 124 and go 0.7 miles to a plaza area that includes the post office. Path will also go through the park to the boat launch and return for 0.5 miles. Funded 80 federal enhancement/20 local. 90905~|~1~|~2~|~02/S<2~|~100% Erie County - Sanitary and Water Line 90905~|~1~|~1~|~01/S<2~|~Bridge Replacement 90905~|~3~|~3~|~03/BRO~|~Consultant to Review Field Conditions 89137~|~1~|~1~|~01/BRF~|~6633307 PIK TR524 0.01 Intersect: Tributary Swift Creek CEAO 80 Fed/20 Local Match Pike County 01/BRF/BR/Pike 94117~|~1~|~4~|~04/NHS~|~See linked structure 10' to 20' span. 94117~|~1~|~3~|~03/IMS~|~See linked structure > 20' span. 94117~|~1~|~2~|~02/NHS/AKRO~|~Resurfacing of SR 91 from SLM 0.72 to 1.40 and 1.80 to 2.54, Urban Paving in the City of Akron. 94117~|~1~|~1~|~01/NHS~|~Resurfacing of SR 91 from 0.30 to 0.72. 94117~|~1~|~5~|~05/NHS/AKRN~|~100% City of Akron items (curb, walk, etc). 112153~|~1~|~1~|~01/NFP~|~Spot paving treatments throughout District 5. 116651~|~1~|~1~|~01/NHS~|~NHS Plan Split 116651~|~1~|~2~|~02/S>2~|~STP > 200,000 Plan Split 116651~|~1~|~3~|~03/S5K~|~STP 5,000 to 49,999 Plan Split 116651~|~1~|~4~|~04/STR~|~Rural Plan Split 93991~|~1~|~1~|~01/BRF~|~Otway Covered BridgeThe Otway Covered Bridge is just outside of the Otway corporation limit, southwest on SR348, then turn west onto Piper Road, TR487, with the covered bridge being located approximately 200? from the SR348/Piper Road intersection, the Otway Covered Bridge spans Scioto Brush Creek in Brush Creek Township, Scioto County, Ohio. It was built in 1874, and is listed on the National Register of Historic Places. It is proposed to restore the strucuter to a single span, remove eixisting steel piers, and replace broken deteriorated timber members, install a new roof & new siding as well as fire protection to keep the bridge in good repair. No SFN do to no longer in use by county.80% FHWA Discretionary Grant Program20% local match01/BRF/BR/Scioto County 108323~|~1~|~1~|~01/IMS~|~OH18-01 ER Event. Landslide repair project. WAS 77 15.37 NB. DSR WAS-008. Funded 100% federal. 97855~|~1~|~1~|~01/MPO~|~Freedom Trail Phase 3, multipurpose trail. 123513~|~1~|~1~|~01/S50~|~High Friction Surface Treatment and upgrade pavement markings 123513~|~1~|~2~|~02/SAF~|~Resurfacing 98169~|~1~|~1~|~01/NHS~|~SCI-23-2.6 to 10.57 98169~|~1~|~2~|~02/NHS~|~Joint repair. 109671~|~1~|~1~|~01/STR~|~AC Overlay with repairs: CLE-131 SLM 11.98 to 15.14 100368~|~1~|~1~|~01/IMS~|~Patch damaged ares of IR 75 in Auglaize & Shelby counties. AUG IR 75 SLM 0.00 to 4.51 SHE IR 75 SLM 18.88 to 20.55 100368~|~1~|~2~|~02/STR~|~SR 196 SLM 4.51 to 4.80 (From their school to the Waynesfield North corporation limit at Sunrise Street) add a 1.25" asphalt overlay. 96947~|~1~|~1~|~01/MPO~|~Split for work eligible for widening of SR-82 using MPO STP at 50% federal / 50% local. 96947~|~1~|~2~|~02/NHS~|~Split for the equivalent of a face-to-face of curb (edge-to-edge of pavement) resurfacing project using urban paving funds at an 80/20 federal/local split. 84461~|~1~|~1~|~01/BRF~|~Newton Falls Bailey SFN 7830602 CR 92B over stream 121057~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 99470~|~1~|~1~|~01/MPO~|~Resurfacing of Fulton Drive (TR-211) from Tuscarawas Road to Park Drive, in the City of Canton, Stark County, Ohio. 93684~|~1~|~1~|~01/BRO~|~High level bridge over the Maumee River in City of Toledo, SFN 4800303. 88822~|~1~|~1~|~01/IMS~|~Sign Upgrades Interstate routes. 88822~|~1~|~2~|~02/NHS~|~Sign Upgrades NHS routes. 88822~|~1~|~3~|~03/STR~|~Sign Upgrades Rural routes. 88822~|~1~|~4~|~04/S>2~|~Sign Upgrades Large Urban routes. 88822~|~1~|~5~|~05/S<2~|~Sign Upgrades Small Urban routes. 88822~|~1~|~6~|~06/NFA~|~Sign Upgrades NFA routes. 97770~|~1~|~1~|~01/S<2~|~SR 159 0.89-1.02 101253~|~1~|~1~|~01/SAF~|~Akron Safe Routes to School, signing and striping upgrades to various crosswalks throughtout the city of Akron. 120639~|~1~|~1~|~01/STR~|~Slope stabilization along US 22 in Fairfield County. 93946~|~1~|~1~|~01/NFP~|~District wide pavement marking plan for long line FY 16 markings using 4PS7 sac code. 93434~|~1~|~1~|~01/CMQ~|~Signal Coordination through central based system. Includes fiber optic interconnects, new signal heads, pedestrian signals, ADA pushbuttons, on Waterloo Road between Main Street and Arlington Road, in the City of Akron. 85355~|~1~|~1~|~01/ENH~|~LAW Ironton SRTS Phase 1 - Safe Routes to School ProjectProject Termini: Delaware Street & 2nd Street Project Description: It is proposed to construct a new sidewalk on Delaware St. beginning @ 2nd St north for 400' with an additional 315' of sidewalk in front of the school and another 65' with a 6' box culvert by the ball field parking. Project includes school zone signs & pavement markings on Delaware Street and a crosswalk and pavement markings at Delaware & Thomas. Per Julie Walcoff, SRTS Coordinatior, Detail Design shall be performed by Task Order Consultant CH2M Hill from PID 86966. 100% federal01/ENH/OT/Ironton 75520~|~1~|~1~|~01/NHS~|~The split is for resurfacing on the National Highway System (NHS) 124540~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 116252~|~1~|~1~|~01/NHS~|~Fine Graded Polymer AC Overlay 116738~|~1~|~1~|~01/NHS~|~All work is in this plan split. 123290~|~1~|~1~|~01/SAF/TUS~|~Pavement marking installation (various routes) utilizing CEAO HSIP (4HB7) funds at 100%. 76122~|~1~|~1~|~01/BRO~|~The project involves the replacement of the existing bridge (HAS-151-0485, SFN 3402010) with a much smaller structure. An initial feasibility study will need to be performed to establish the viability of this. 90651~|~1~|~1~|~01/NFA~|~culvert at HEN SR18 1.91-1.92 122463~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 119423~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs ERI-60-0.00 to 3.43 90218~|~1~|~2~|~02/ENH~|~Work items using 100% local funding. 90218~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for use with enhancement funds. 102000~|~1~|~1~|~01/NFP~|~Loop maintenance and repair along various routes throughout District 4. 121633~|~1~|~1~|~01/NHS~|~Improve lighting 124019~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs WAY-95-0.00 to 7.974 including bridge maintenance 124019~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs WAY-95-7.974 to 8.744 97185~|~1~|~1~|~01/SAF~|~Various intersection improvements at SR 183 including reflective back plates; new warning signs; upgrading the existing signal; and increasing the storage capacity of the turn lanes on the northbound approach. 118759~|~1~|~1~|~01/STR~|~Chip seal 100065~|~1~|~1~|~01/STR~|~Slide repair LAW 217 7.80 112943~|~1~|~1~|~01/STR~|~Rural Plan Split: PIC-56-0.00-16.32 86648~|~1~|~2~|~02/S>2~|~100% Whitehall funded items - pvmt repair02/S>2/PV/WHIT 86648~|~1~|~1~|~01/S>2~|~Federal/Local urban paving in Whitehall, SLM 18.63-21.4001/S>2/PV/ 94086~|~1~|~1~|~01/STR~|~Four Lane mowing contract for Interstate 75 and US 33 121251~|~1~|~1~|~01/IMS~|~Resurfacing. 121251~|~1~|~2~|~02/NHS~|~Resurfacing. 121251~|~1~|~3~|~03/S>2~|~Resurfacing. 121251~|~1~|~4~|~04/STR~|~Resurfacing. 101456~|~1~|~1~|~01/STR~|~DSR# JEF-004 93151~|~1~|~1~|~01/BRF~|~Bridge replacement project. GAL CR 121 1.52 (SFN 2740516). Federal 80% and Local 20%. 117745~|~1~|~1~|~01/SAF~|~Rebuild traffic signals 90225~|~1~|~1~|~01/STR~|~Bridge work on MAH-US224 SFN 5004535, 5004608, 5004616 and MAH-534 SFN 5005809, 5005833, 5005892, 5005914 121792~|~1~|~1~|~01/SAF~|~RPM on various CR. 84545~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment with repairs. WAS 339 4.38-8.57. Rural other federal aid funded 80 federal/20 state. 100523~|~1~|~1~|~01/S<2~|~Resurfacing of US 62 on the STP-Urban sections (SLM 0.00 to 1.13, 2.61 to 3.87, and 4.40 to 4.86) 100523~|~1~|~2~|~02/STR~|~Resurfacing of US 62 in the STP Rural sections (SLM 1.13 to 2.61 and 3.87 to 4.40) 89037~|~1~|~1~|~01/CMQ~|~80/20 fed/local CMAQ funding for all work on this project 89037~|~1~|~2~|~02/CMQ~|~100% local participation for work items not eligible for CMAQ funding as well as the cost of the project beyond the capped CMAQ funding. 119985~|~1~|~1~|~01/MPO/FRA~|~MVRPC STBG funded resurfacing of SR 73 in the City of Franklin with a 31% local match. 101229~|~1~|~1~|~01/NFP~|~Construct new outpost. 102961~|~1~|~1~|~01/NHS~|~NHS Resurfacing: LOR-58 102961~|~1~|~2~|~02/S<2~|~STP < 200000 Resurfacing: LOR-113-6.48-7.31 102961~|~1~|~3~|~03/STR~|~STP Rural Resurfacing: LOR-113-7.31-7.45 98235~|~1~|~1~|~01/S<2/NEWA~|~City of Newark SRTS Funding - 4SC7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Project for sidewalks on Arlington Avenue 122833~|~1~|~1~|~01/MPO~|~Roundabout 85500~|~1~|~1~|~01/BRF/LIMA~|~For work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 115955~|~1~|~1~|~01/SAF~|~Installation of centerline and edgeline rumble stripes on MEG 7 14.58-18.64. Safety funded. 87258~|~1~|~1~|~01/STR~|~LAW SR217 0.00 - 8.73 Resurfacing Project Begin at SR141 and terminate at the 8.73 mile marker.Pave Thru Brdgs: 4402855 LAW SR217 2.17 Intersect: Big Ice Creek 4402952 LAW SR217 5.77 Intersect: Dicks Creek 4403002 LAW SR217 6.86 Intersect: Venisonham Creek 4403045 LAW SR217 7.39 Intersect: Trib,Venisonham Creek Skip these brdgs: 4402979 LAW SR217 5.85 Intersect: Symmes Creek 4402898 LAW 217 2.32 80/20 split 01/STR/PV/State 86834~|~1~|~2~|~02/S>2/Cin~|~Urban Paving for the City of Cincinnati in FY2013. This project will resurface a portion of Reading Road (US 42) from Dorchester to Paddock: US 42 from SLM 2.60 to 5.70. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 86834~|~1~|~1~|~01/S>2/CIN~|~Urban Paving for the City of Cincinnati in FY2013. This project will resurface a portion of Reading Road (US 42) from Dorchester to Paddock: US 42 from SLM 2.60 to 5.70. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. 81486~|~1~|~1~|~01/NHS~|~minor rehabilitation of BEL-7-11.87 to 14.08; inludes asphalt overlay of existing bare concrete, pavement repair, pavement marking, rpms 110981~|~1~|~1~|~01/SAF~|~Safety money 107562~|~1~|~1~|~01/MPO~|~Multi-purpose trail, NOACA Funded 114624~|~1~|~1~|~01/SAF~|~Intersection improvement 122183~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded PHB's 122183~|~1~|~2~|~02/SAF~|~Plan Split for 100% Locally funded cost for Alternate Bid Item 102444~|~1~|~2~|~02/STR~|~Culvert invert repair FY19BRO 68 21.03HIG 247 3.29PIK 772 18.86 102444~|~1~|~3~|~03/S<2~|~Culvert invert repair FY19SCI 239 0.74 102444~|~1~|~4~|~04/STR~|~ROS 138 16.41 Invert Repair 102444~|~1~|~1~|~01/NHS~|~Culvert invert repair FY19ADA 32 3.82/5.57/14.54BRO 32 3.06/19.19ROS 35 15.09/16.17 106209~|~1~|~1~|~01/IMS~|~FY 2023 Block PID for drainage system maintenance/repair. 93883~|~1~|~1~|~01/CMQ~|~MORPC CMAQ funding for bikepath and and related items 93883~|~1~|~2~|~02/MPO~|~MORPC STP funding for bridge pile cover/aesthetics on Main, Rich, and Broad St bridges (due to lowering water level) 93883~|~1~|~3~|~03/ENH~|~MORPC TE funds for landscaping 110992~|~1~|~1~|~01/SAF~|~Add SB right turn lane, signal improvements and friction improvements 93418~|~1~|~1~|~01/NFA~|~resurfacing of entrace road, gatehouse road, Marina Road and road from gatehouse to vacation cabins at Atwood Lake Park; resurfacing of Downey Dr. SW at Atwood Lake Park; resurfacing of full depth repairs and resurfacing of Marina Ramp turnaround, Marina roads, and campground roads in Piedmont Lake Park - using MWCD funding 111449~|~1~|~1~|~01/ENH~|~Construct sidewalks along SR 241 in Mt. Hope at 95% Federal/5% Local (95% 4B37/5%LNTP) 122247~|~1~|~1~|~01/NFP~|~All items of work associated with repair/replacement of ROW fence 90435~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 821 4.88, SFN 6105378. Rural federal aid funded 80 federal/20 state. 121841~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 110465~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan Split 1 113924~|~1~|~1~|~01/BRO~|~CEAO funded items 81766~|~1~|~1~|~01/SAF/PICK~|~Safety Program - 4HJ7 (90% Federal) / 4BG7/4BG6 (7% Local/3% OPWC ) - CAP (See Comments) - Safety project on FAI SR 256 2.16 - 2.88 and Refugee Road (CR 7) to add turn lanes, upgrade signal equipment and add medians and sidewalk along SR 256 and CR 7. 81766~|~1~|~2~|~02/MPO/PICK~|~MORPC STP Funds - 4TA7 (80% Federal) / 4BG7/4BG6 (17% Local /3% OPWC) - CAP (See Comments) - Safety project on FAI SR 256 2.16 - 2.88 and Refugee Road (CR 7) to add turn lanes, upgrade signal equipment and add medians and sidewalk along SR 256 and CR 7. 112965~|~1~|~1~|~01/NHS~|~FRA-33 from 9.17 to 10.79 112965~|~1~|~2~|~02/S>2~|~FRA-674 from 1.96-2.07 and 2.13-2.17. FRA-62 from 8.850 to 9.080, 9.100 to 9.140, 9.200 to 9.500 and 9.740 to 9.960 108154~|~1~|~2~|~02/NHS~|~FRA-317 from 15.95-15.97 108154~|~1~|~1~|~01/S>2/COC~|~City of Columbus Urban Paving: FRA-317-15.97-16.37 108154~|~1~|~3~|~03/S50~|~City of Gahanna Urban Paving Plan split - FRA-317-16.37-18.52. 83663~|~1~|~3~|~03/IMS~|~Major reconstruction of the existing lanes and the construction of an additional lane in each direction on IR 70 from US 68 interchange to the SR 72 interchange. Other work will include installation of median cable barrier and all required roadway, erosion control, drainage, traffic control and maintenance of traffic items. Addition of a noisewall. CLA-IR-70 10.540 to 14.000 83663~|~1~|~4~|~04/S>2~|~Resurface add curb and curb inlet in this area of SR 72 SLM 6.50 to 6.77. 83663~|~1~|~2~|~02/IMS~|~Rehab of structure CLA IR 70 11.51 - SFN 1204297 83663~|~1~|~1~|~01/IMS~|~Replacement of structures. MSE walls required CLA IR 70 12.08 and 13.26. 83663~|~1~|~5~|~05/IMS~|~On-going services 83663~|~1~|~6~|~06/NFP~|~Retroactive fuel price adjustment 99511~|~1~|~1~|~01/IMS~|~Project to strengthen the under reinforced concrete pier caps of Bridge HAM-71-3.81 using Fiber Reinforced Polymer wraps. 104796~|~1~|~1~|~01/NHS~|~Rock fall cleanup. 120719~|~2~|~2~|~02/NFP/ZANE~|~Plan split for Non-Federal Eligible resurfacing within the City of Zanesville. 120719~|~1~|~1~|~01/S50/ZANE~|~Resurfacing of Federal Eligible routes within the City of Zanesville with STP/Large City funds (4TA7 @ 80% Federal/20% LNTP). 108777~|~1~|~1~|~01/BRF/CCEO~|~CEAO Local Bridge Replacement (LBR) Program - 4B87 (80% Federal) / 4BG7 (20% Local Match - CAP (See comments) - Replacement of Cos-CR 365-00.08 SFN 1630016 CR 365 Road over Mohican River 124922~|~1~|~1~|~01/ENH~|~Improve five sections of the Olentangy Trail and Scioto Trail including signs, pavement marking, vegetation removal to improve sight distance, and addressing hazardous pavement conditions such as root upheavals, cracking, and standing water with partial and full-depth asphalt concrete resurfacing, overlay, and crack sealing. 118668~|~1~|~1~|~01/NFP~|~This project is the District?s long line maintenance contract to maintain the center line, edge line, lane line, and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district. 105743~|~1~|~1~|~01/IMS~|~Plan split for pavement replacement 105743~|~1~|~2~|~02/IMS~|~Split for work to replace the bridge over the old W&LE RR 105743~|~3~|~3~|~03/IMS~|~Split for Part 3 for bridge maintenance work on overhead bridges. 105743~|~3~|~4~|~04/IMS~|~Plan Split for miscellaneous repairs to existing retaining walls along IR-77 86926~|~1~|~1~|~01/BRO~|~4803094 LUC IR75 2.34 Intersect: Indiana Ave 97163~|~1~|~1~|~01/S>2~|~Resurfacing Portage Street from Lorraine Ave to Frank Avenue in Jackson Township. 93173~|~1~|~1~|~01/SAF~|~Safety funding for medians, access points, signals on West Broad 93173~|~1~|~2~|~02/NHS~|~Resurfacing, drainage improvements, and other items not paid by safety funds 93173~|~1~|~3~|~03/NHS/Cols~|~Costs to relocate Columbus utilities that were not previously relocated. 95004~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split 117216~|~1~|~1~|~01/STR~|~Replace deck on UNI-36-15.11 over Mill Creek 114865~|~1~|~1~|~01/IMS~|~Corridor improvements, work TBD. 114865~|~1~|~2~|~02/NHS~|~Pavement reconstruction. 114865~|~1~|~3~|~03/NHS~|~Structure widening. 100733~|~1~|~1~|~01/BRO~|~All work to replace bridge is in this split. This structure's sufficiency rating or deck summary rating is not low enough to be eligible for federal funds for a bridge replacement. Funding is federal and state funds from the District Preservation Program SACs 4PF7 and 4PS7 97373~|~1~|~1~|~01/NHS~|~Culvert work on NHS System (PIC-23, UNI-33) 97373~|~1~|~2~|~02/STR~|~Culvert work on SR 207 94199~|~1~|~1~|~01/IMS~|~Resurfacing on I-75 to hold over until TRAC projects widen the roadway. Resurface all lanes and ramps of I-75 from Shepard Ln to Glendale Milford. HAM IR 75: SLM 12.58 to 14.56 114626~|~1~|~1~|~01/NFA~|~Created for J&C involvement 106863~|~1~|~1~|~01/S>2~|~Plan split for federal urban paving eligible work 106863~|~1~|~2~|~02/NFP~|~Split 2 for work not eligible for the urban paving program. 106863~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 94494~|~1~|~1~|~01/MPO~|~Reconstruct Intersection of SR-48 and Mason Morrow Millgrove Road 87320~|~1~|~1~|~01/STR~|~general system resurfacing of TUS-212; includes pavement repairs and pavement marking 102993~|~1~|~1~|~01/BRF~|~01/BRF/BR/JEF - CR 17 3.88 Bridge replacement over Rush Run; 80% 4C87/20% LNTP. 115231~|~1~|~1~|~01/STR~|~Slide repair 106185~|~1~|~1~|~01/MPO~|~Construction of a bike path bridge over Hutchinson Road (west of Filview Circle, at the old RR bridge location) to connect the Harrison Avenue bike path on both sides of Hutchinson Road. 117041~|~1~|~1~|~01/NFA~|~Created for J&C involvement 119330~|~1~|~1~|~01/STR~|~Resurfacing. 105183~|~1~|~1~|~01/NFP~|~Painting bridges on the state system 103397~|~1~|~1~|~01/STR~|~Landslide repair utilizing a drilled shaft wall with cribbing. ATH 329 9.57. Work length approximately 250 ft. DSR ATH-004. 113584~|~1~|~1~|~01/NFP~|~Created for J&C involvement 106143~|~1~|~1~|~01/IMS~|~Reconstruct STA-IR 77 SB western embankment around SLM 1.27 due to erosion from nearby creek. 106665~|~1~|~1~|~01/ENH~|~Rehabilitate Great Stone Viaduct, includes trailhead, bike/ped path, lighting. 85356~|~1~|~1~|~01/BRF~|~"01/BRF/BR/MUSK" Muskingum County Park project - Replace the northern most stream crossing with bridge structure that can handle vehicle and pedestrian traffic. Improve and extend the existing roadway to small parking area 107792~|~1~|~4~|~04/S>2~|~Items of work to be paid 100% by the City of Columbus. 107792~|~1~|~1~|~01/NHS~|~NHS Plan Split (Priority System): FRA-161 (Including CD Lanes): 14.31-14.86 15.06-16.56 107792~|~1~|~2~|~02/S>2~|~Urban Paving Split (City of Columbus): FRA-161: 14.02-14.31 14.86-15.06 107792~|~1~|~3~|~03/BRO~|~SFN's 2509059, 2509083, 2509105, 2509091, 2509199, 2509520, 2509563, 2509644, 2509539 83599~|~1~|~1~|~01/BRO~|~Replacement of SFN 0402257 over Northfork and Southern RR 83701~|~1~|~1~|~01/BRF~|~Bridge Replacement 96728~|~1~|~1~|~01/NFA~|~Summit County Interchange Outpost, upgrade floor drains and tie into Sanitary Sewer and Water. Project to be determined by possible Industrial Park NE of facility 122300~|~1~|~1~|~01/IMS~|~Noisewall construction along IR277 93756~|~1~|~1~|~01/STR~|~01/STR/BR/ ; ALL-103-0152, SFN 0203602; 80% Fed (4PF7) - 20% State (4PS7) - No Cap 92170~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for 1 year 104874~|~1~|~1~|~01/MPO~|~Work TBD. 119893~|~1~|~1~|~01/NHS~|~150ft landslide on IR 77 at 12.36mm. 105382~|~1~|~1~|~01/IMS~|~AC Overlay with repairs 105382~|~2~|~2~|~02/IMS~|~Resurface the pavement and minor repairs to curbs and catch basins within the rest areas. 113312~|~1~|~1~|~01/MPO~|~work eligible for federal-aide. 121828~|~1~|~1~|~01/NFA~|~installation of 3 EV charging stations in City of Fairfield 121664~|~1~|~1~|~01/IMS~|~Replace overlay and approach slabs 91789~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. VIN 327 0.00-4.94. Rural other federal aid funded 80 federal/20 state. 91789~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. VIN 671 0.00-4.58. Not on any federal aid system funded 100% state. 108958~|~1~|~1~|~01/SAF~|~2021/2022 Traffic Signal Maintenance. 123750~|~1~|~1~|~01/S>2~|~STP >200,000 plan split 105477~|~1~|~1~|~01/STR~|~CREATED CO CO Contr 01 105477~|~1~|~2~|~02/STR~|~CREATED CO CO Engr 01 106714~|~1~|~1~|~01/NFA~|~The City will construct approximately 1250 of new roadway starting at the end of Mclane Drive and to the west. 112742~|~1~|~2~|~02/STR~|~WAY SR 0301 04.64 112742~|~1~|~1~|~01/NHS~|~WAY US 0250 25.67 112742~|~1~|~3~|~03/S5K~|~WAY SR 0585 06.20 98919~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County. 118154~|~1~|~1~|~01/STR~|~Landslide repair. 107566~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district. 111051~|~1~|~1~|~01/SAF~|~Pavement markings on various county routes throughout Stark County. 109579~|~1~|~1~|~01/SAF~|~Safety funded project for intersection lighting, signal controllers and pavement markings on WAS 7 24.86-24.98 (County House Lane CR 344). Funded 100% Safety. 110607~|~1~|~1~|~01/NFP~|~Split for sign structure repair 101620~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - 4PF7(80% Federal)/4PS7 (20% State) - No CAP - Resurfacing of FAI SR 664 0.00 to 7.47. 101620~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation - 4PS7 (100% State) - No Cap - Resurfacing work on FAI-312, PER-312, HOC-312. 87222~|~1~|~1~|~01/STR~|~0100846 ADA SR41 4.29 Intersect: Richley Run 80 Fed/20 State. 01/STR/BR/State 110393~|~1~|~1~|~01/STR~|~Resurfacing SR 43 110393~|~1~|~2~|~02/SAF~|~Centerline Rumble Stripe work, including Longitudinal Joint Preparation 114273~|~1~|~1~|~01/IMS~|~Mowing contract in D8 115428~|~1~|~1~|~01/NHS~|~Plan Split to program project. Revise at Scope Complete. 124609~|~1~|~1~|~01/NHS~|~All work associated with the bridge repairs. 108718~|~1~|~1~|~01/STR~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-013 108718~|~1~|~2~|~02/STR~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-012 106118~|~1~|~1~|~01/S>2~|~Cycle track and lighting in the City of Dayton. 83922~|~1~|~2~|~02/NFA~|~Resurfacing existing roadway along with other roadway related items on AUG SR 364 from 5.71 to 9.72 83922~|~1~|~3~|~03/STR~|~Remove and replace wearing surface of SFN 0603392 AUG 274 0294 on the St. Marys River with asphalt overlay with Type 3 Waterproofing. Also Removing and replacing existing polymer joints. 83922~|~1~|~1~|~01/STR~|~Resurface existing roadway along with other roadway related items on SR 274 from 0.00 to 3.15. 97899~|~1~|~1~|~01/NHS~|~US 36 (East Ash Street) from Centre/Scott Drive to Looney Road - construction of a seperated bike lane and pedistrian facility and the installation of tree plantings. 119124~|~1~|~1~|~01/NHS~|~Resurfacing. 122786~|~1~|~1~|~01/STR~|~D10 Lighting Project FY 2030 101081~|~1~|~1~|~01/STR~|~Overlay US 36 in Chanmpaing County: CHP US 36 SLM 0.00 to 12.41 101081~|~1~|~2~|~02/S<2~|~Overlay US 36 in Champaign County: CHP US SLM 12.41 to 13.84 101081~|~1~|~3~|~03/NHS~|~Overlay US 36 in Champaign County: CHP US 36 SLM 13.84 to 14.08. 119939~|~1~|~1~|~01/NHS~|~Bridge Repairs on LOR SR 0002 at 00.97R and 07.42R. 113225~|~1~|~1~|~01/NHS~|~State Emergency Funding - (4BE7 100% State) - See CAP Comments - Replacement of the inlet apron and cutoff wall on SFN 4501233 110635~|~1~|~1~|~01/STR~|~Bridge Replacement7302371 SSCISR00073**C 5.1207302401 SSCISR00073**C 5.21 107457~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 107457~|~1~|~1~|~01/IMS~|~Resurfacing. 117013~|~1~|~1~|~01/MPO/XEN~|~Resurfacing of Bellbrook Avenue from S. Allison Avenue to W. Second Street 124056~|~1~|~1~|~01/SAF~|~Plan split for federally eligible work items paid with safety funds. 95371~|~1~|~1~|~01/NHS~|~It is proposed to removed debris from the piers and abutments of the following structures.4402014 District 9 SLAWSR00093**C : 26.370 6600573 District 9 SPIKUS00023**C : 11.560 6601669 District 9 SPIKSR00032**C : 13.740 6601146 District 9 SPIKSR00124**C : 5.990 7103301 District 9 SROSUS00050**C : 19.260 7104189 District 9 SROSSR00159**C : 0.420 7105657 District 9 SROSSR00772**C : 15.140 100% Maintenance Funds 109190~|~1~|~1~|~01/STR~|~Resurfacing project on MOE CR 12 8.80-20.16. Funded 80 federal/20 local. 98878~|~1~|~1~|~01/MPO~|~SR 169 from Robbins Ave to E Federal St, Lighting upgrades only. 113961~|~1~|~1~|~01/MPO~|~Rehab eligible items. 113961~|~1~|~2~|~02/ENH~|~Non-eligible items. 106697~|~1~|~1~|~01/STR~|~Rehab rural bridge. 109921~|~1~|~1~|~01/NHS~|~BRO 32 0.00-5.77 97853~|~1~|~1~|~01/STR~|~Reconstructing overhead flashers, no pavement work. 84633~|~1~|~1~|~01/NHS~|~BRO SR125 SLM 6.42 - 10.84 & US68 SLM 12.13 - 17.68 Resurfacing ProjectBoth routes are NHS.On SR125, begin 0.25 mile east of TR402 & terminate @ overlap w/US68; on US68, begin 0.1 mile south of TR2 & terminate @ SR125, it is proposed to resurface the highway.80/20 split 84633~|~1~|~2~|~02/NHS~|~BRO SR125 NHSBrdgs to Rehab: 0802247 BRO SR125 9.230 80/20 split 109750~|~1~|~1~|~01/S<2~|~01/S<2/PV/ : Plan Split 1 109750~|~1~|~2~|~02/STR~|~02/STR/PV/ : Plan Split 2 76721~|~1~|~1~|~01/NHS~|~Complete pavement replacement. 76721~|~1~|~2~|~02/NHS~|~Bridge work on the linked structures > 20' span. 76721~|~4~|~5~|~05/NHS/BHTS~|~Slope repair on CVNP trail between SR 8 and Cleveland Massillon Rd. 76721~|~2~|~3~|~03/NHS~|~Construction of noise wall on the West side of State Route 8, between Hampshire Road and Treeside Drive, in the City of Stow, Summit County, Ohio. 76721~|~3~|~4~|~04/NHS~|~Miscellaneous noise wall repairs along IR 77 in Stark and Summit Counties. 76721~|~6~|~6~|~06/IMS~|~Noise Wall repair to I77NB right side at 133.79 by change order. 110157~|~1~|~1~|~01/S<2~|~Bridge repair 110157~|~1~|~2~|~02/NHS~|~Bridge repair 110157~|~1~|~3~|~03/IMS~|~Bridge repair 113223~|~1~|~1~|~01/SAF~|~ROS 159 signal upgrade. 108719~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-028 108719~|~1~|~2~|~02/S<2~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-029 108719~|~2~|~3~|~03/S<2~|~Landslide repair, ER Event # OH19-01, DDIR# BEL-004 83453~|~1~|~3~|~03/BRO~|~Bridge Painting - sfn:8506213 / WAY-585-16.47 83453~|~1~|~2~|~02/STR~|~Bridge Painting - sfn:8504083 / WAY-094-18.03 83453~|~1~|~1~|~01/NHS~|~Bridge Painting - 5 structures WAY County 123764~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance work 105542~|~1~|~1~|~01/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the superstructure and abutments on SFN 6000150 Mus-SR 16-12.99 carrying SR 16 over Grahams Creek 122204~|~1~|~1~|~01/SAF~|~Plan Split for SRTS and HSIP funded scope 118709~|~1~|~1~|~01/NHS~|~Superstructure replacement. 102042~|~1~|~1~|~01/NFA~|~The city is constructing a new road off of SR585 (Akron Road) to support the growth of Luk USA. 93848~|~1~|~1~|~01/IMS~|~Bridge painting project. WAS 77 4.73 L (SFN 8403066), R (SFN 8403090), 6.78 (SFN 8403155), 7.98 (SFN 8403244), 9.73 (SFN 8403309) and 10.34 (SFN 8403333). Work includes bridge painting and beam repair on WAS 77 1637 L (SFN 8403511), WAS 77 1637 R (SFN 8403546), WAS 77 1687 L (SFN 8403570), and WAS 77 1687 R (SFN 8403600). Interstate work funded 90 federal/10 state. 92608~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds. 98536~|~1~|~1~|~01/SAE~|~District Wide contract for PM/RPM in District 8 for FY2019. Routes to be determined 91759~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 37 8.22-9.83. Federal 80% and State 20%. 122280~|~1~|~1~|~01/S>2/SCEO~|~Construct new roundabout. 97689~|~1~|~1~|~01/NFP~|~Remove PTSWF signs and install radar based dilemma zone detection at various locations 108847~|~1~|~1~|~01/SAF~|~Install approximately 35 CCTV cameras at various locations throughout the State 98274~|~1~|~1~|~01/STR~|~Preventive Maintenance - Chipseal 121517~|~1~|~1~|~01/SAF~|~Signal & Lighting replacments 94622~|~1~|~3~|~03/SAF~|~100% local items (Sanitary Sewer) 94622~|~1~|~1~|~01/SAF~|~Relocation of Chester Road to align with Recreation Parkway. 94622~|~1~|~2~|~02/SAE~|~Relocation of Chester Road at SR 611. 99474~|~1~|~1~|~01/SAF~|~SCI SR 104 11.91 92004~|~1~|~1~|~01/NFA~|~Bikeways added to Warren Riverwalk-Lovers Lane 109629~|~1~|~1~|~01/S<2~|~Emergency repair on BRO 41 1.06. 100348~|~1~|~1~|~01/NHS~|~Airway Road from the west corp limit to Harshman Avenue in the City of Riverside Improve pavement condidtion by milling and resurfacing with asphalt concrete, improving drainage and spot repairs of curb and sidewalk. 100348~|~1~|~2~|~02/SAF~|~Creating the positive off-set for the left-turn lanes on Airway Road and converting the signal operations from permitted to protected left turning movements on Woodman Drive and Burkhardt Road. 100468~|~1~|~1~|~01/NFA~|~HOL-179 Chip Seal 120705~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs. 120802~|~1~|~1~|~01/SAE~|~Cable median barrier on I-74 from Indiana state line to I-275 82838~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. MEG 689 0.00-4.16 and VIN 689 0.00-3.36. Rural other federal aid using 80 federal/20 state funds. 97271~|~1~|~1~|~01/NFA~|~Construct a new parking lot and service road at the Lockwood Trailhead to service the Western Reserve Greenway Bike Trail. 105526~|~1~|~2~|~02/NFA~|~Work on SR 231 in Wyandot County from CR 430 at SLM 10.34 to SR 103 at SLM 17.87. This section of SR 231 is a minor collector and is not eligible for federal aid. All funds from the District Preservation Program budget. No local funds. 105526~|~1~|~1~|~01/STR~|~Work in Wyandot County on various routes. On SR 67 from SR 103 (25.86) to the north corporation limits of the Village of Sycamore (26.98). On SR 103 from SR 199 (7.26) in the Village of Carey to SR 53 (12.41), from SR 53 (12.96) to SR 67 (17.88) and from SR 67 (18.30) to the Crawford County line (21.31). On SR 231 from SR 67 (20.53) to the Seneca County line (22.95). All funds from the District Preservation Program budget. No local funds. 98743~|~1~|~2~|~02/NFA~|~Improvements made to Wikel Road. 98743~|~1~|~3~|~03/NFA~|~Improvements made to Chapin Road. 98743~|~1~|~1~|~01/NFA~|~Improvements made on Frailey Road. 115844~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2028. 124127~|~1~|~1~|~01/IMS~|~Interchange improvements 95559~|~1~|~1~|~01/IMS~|~Priority System minor rehab. on TUS-77; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, and pavement marking. 98746~|~1~|~1~|~01/NHS~|~US-20 culvert @ 24.85 98068~|~1~|~1~|~01/STR~|~STP Rural 80/20 DEL-745-0.00 to 7.03 115464~|~1~|~1~|~01/NFP~|~Resurfacing Second Street Market Parking Lot 94456~|~1~|~1~|~01/ERD~|~Earmark ID FL120 is an earmark with 100% federal pariticipation to be used for repairing a section of the culvert under Snowville Road approximately 0.3 mile west of Riverview Road in the City of Brecksville 99910~|~1~|~1~|~01/BRF~|~CEAO bridge replacement Phelps Rd over Bokes CreekSFN 8037787 108912~|~1~|~1~|~01/NFA~|~Lightner Road improvement - MCTID 22132~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 122639~|~1~|~1~|~01/STR~|~Resurfacing. 122639~|~1~|~2~|~02/S>2~|~Resurfacing. 96636~|~1~|~1~|~01/IMS~|~Plan Split for all work included in this mowing project. Mowing includes all interstates and interstate look-a-likes in District 8. Also includes trimming. 102530~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal)/4PS7 (20% State) - No CAP - Bridge painting on bridges in COS and LIC Counties 102530~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding - 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge painting on various Interstate IR 70 bridges in Muskingum County. 107146~|~1~|~1~|~01/NFA~|~The Port Authority will rehabilitate approx. 1.3 miles of Airpark Drive. 101083~|~1~|~1~|~01/STR~|~Overlay US 40 & US 68 in Clark County: CLA US 40 SLM 19.70 to 27.51 101083~|~1~|~2~|~02/NHS~|~Overlay US 40 & US 68 in Clark County: CLA US 68 SLM 0.00 to 4.46 101083~|~1~|~3~|~03/S<2~|~Overlay US 40 & US 68 in Clark County: CLA US 40 SLM 18.74 to 19.70 101083~|~1~|~4~|~04/IMS~|~Interstate ramp paving 98722~|~1~|~3~|~03/NFP~|~This is for all ineligible urban paving items. 98722~|~1~|~2~|~02/S<2~|~SR-101 from SLM 1.30 to 1.64; SR-100 from SLM 9.84 to 10.05; SR-100 from SLM 10.21 to 10.45 98722~|~1~|~1~|~01/NHS~|~SR-18 from SLM 13.00 to 13.26 95537~|~1~|~2~|~02/STR~|~Bridges County/ Route County True Log Point Overall Length 0102776 ADA SR -73 10.440 167.3 0102563 ADA SR -73 3.920 45.0 0102466 ADA SR -73 0.460 119.0 0102822 ADA SR -73 10.440 31.0 0102520 ADA SR -73 3.350 210.0 0102741 ADA SR -73 7.900 75.4 0102806 ADA SR -73 10.440 131.0 95537~|~1~|~3~|~03/NFA~|~HIG 785 3.25 (SFN 3604667) 95537~|~1~|~4~|~04/STR~|~ADA 73 5.73 (SFN 0102644) 95537~|~1~|~1~|~01/STR~|~On SR73, begining @ the Highland Co. line (SLM 0.00) south for 15.58 miles and terminating @ the Scioto Co. line (SLM 15.58), it is proposed to resurface the highway with asphalt concrete.Skip the overlap with SR41 in Locust Grove.Pave Thru BridgesSFN 0102490 SLM 1.57SFN 0102709 SLM 6.77Skip Brdg SFN 0102679 SLM 6.4580/20 split 119862~|~1~|~1~|~01/S5K~|~All Work Included in this Split 119235~|~1~|~1~|~01/S5K~|~Circleville urban area plan split 119235~|~1~|~2~|~02/STR~|~Rural plan split 114685~|~1~|~1~|~01/S<2~|~Resurfacing Smoothseal. 108812~|~1~|~1~|~01/IMS~|~Emergency repairs to linked structure > 20' span. 98792~|~1~|~4~|~04/NFA~|~Pavement repair project. Not on any federal aid system funded 100% state. Locations: MOE 26 17.06-29.45, 30.10-30.36, MOE 255 0.00-18.08, MOE 260 0.00-4.33, 5.52-11.32, MOE 379 0.00-4.57, 6.05-8.07, MOE 724 0.00-1.30, NOB 146 0.00-8.33, NOB 147 0.00-2.60, NOB 260 0.00-1.90, 3.75-14.35, NOB 340 0.00-0.71, NOB 513 0.00-9.38, NOB 564 0.00-13.48, NOB 566 1.59-4.80, NBO 724 0.00-2.75, NOB 761 0.00-1.90, and WAS 260 0.00-9.76, 9.98-11.00. 98792~|~1~|~3~|~03/STR~|~Pavement repair project. Rural other federal aid funded 80 federal/20 state. Locations: MOE 26 0.00-17.06, 29.45-30.10, MOE 78 0.00-32.26, MOE 145 0.00-21.41, 22.06-25.80, MOE 260 4.33-5.52, MOE 379 4.57-6.05, MOE 536 2.44-12.58, MOE 537 0.00-4.98, MOE 556 0.00-13.24, MOE 565 0.00-4.10, MOE 800 0.00-15.46, 17.92-26.04, NOB 78 0.00-5.61, 7.36-7.91, 9.63-21.35, NOB 83 0.00-6.77, NOB 145 0.00-12.39, NOB 146 8.33-18.59, NOB 147 3.50-21.04, NOB 215 0.00-4.61, NOB 285 0.30-5.31, 5.36-14.47, NOB 313 0.00-6.21, NOB 339 0.00-9.12, NOB 340 0.71-7.01, NOB 513 9.46-12.45, NOB 565 0.00-2.88, NOB 566 0.00-1.59, NOB 574 0.00-3.68, NOB 821 0.00-8.00, 12.78-21.36, WAS 26 24.74-29.36, WAS 145 0.00-3.25, and WAS 821 1.56-20.77. 98792~|~1~|~2~|~02/S<2~|~Pavement repair project. Urban other federal aid funded 80 federal/20 state. Locations: MOE 536 0.64-2.44, NOB 78 5.61-7.36, 7.91-9.63, NOB 285 0.00-0.30, NOB 340 7.01-7.08, NOB 821 8.00-12.78, and WAS 821 0.00-1.56. 98792~|~1~|~1~|~01/NHS~|~Pavement repair project. NHS routes funded 80 federal/20 state. Locations include: MOE 7 0.00-28.55 and MOE 536 0.00-0.24. 103164~|~1~|~1~|~01/IMS~|~Plan split for guardrail repair 103164~|~1~|~2~|~02/IMS~|~Plan split for guardrail upgrading on the interstate 103164~|~1~|~3~|~03/STR~|~Split for guardrail upgrading on the Rural STP system. 90980~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - High Risk Rural Roads (HRRR) Funding - No CAP - Kno-SR 229-00.43 to 00.47 94058~|~1~|~1~|~01/NHS~|~Federal Emergency project Disaster Flood Event OH11-01 DSR JEF-004 excavate and bench material to mitigate a rockfall situation. 116842~|~1~|~1~|~01/S>2~|~Resurface Wolf Creek St. 83672~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No cap - all work to remove or repair structures, SFN's 8801029, 8801053, 8800030, 8800065 and 8800154. 83672~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No cap - all roadway work, not involving the structures, with the project. 94519~|~1~|~1~|~01/NFA~|~Project will enhance railroad infrastructure within the last quarter-mile of the Central Railroad of Indiana (CIND) leading up to the Cincinnati Bulk Terminals (CBT) facility by building a run-around and storage track that will provide for the efficient switching, loading, and placement of rail cars for the benefit of CBT. 110647~|~1~|~1~|~01/NHS~|~Resurfacing of ATB US 20 from 13.00 to 14.69. 110647~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 98168~|~1~|~1~|~01/STR~|~Plan split for Signal work 98852~|~1~|~1~|~01/S>2/BTID~|~Extension of Salzman Road from the current dead-end north of SR-63 to the existing western T-intersection of Yankee Road and Todhunter, approximately 2750 ft. The project will modify the existing intersection at Todhunter from its current T-configuration to a four-way intersection, and construct a new three lane segment south to Salzman Rd. Improvements include installation of curb and gutter, storm sewer system, and intersection lighting at Todhunter. The extension of Salzman will provide a direct route for truck traffic to access SR-63 and provide relief to Yankee Road between Todhunter and SR-63. 98852~|~1~|~2~|~02/NFA~|~The TID is constructing the Salzman Rd extension including, but not limited to extending Salzman from its existing northern terminus to the north to connect to the intersection of Todhunter Rd at the southern terminus of Yankee Rd. 98852~|~1~|~3~|~03/NFA~|~TID is constructing the Salzman Road Extension, including but not limited to extending Salzman from its existing northern terminus to the north to connect to the intersection of Todhunter Road at the southern terminus of Yankee Road 98852~|~1~|~4~|~04/NFA~|~Realignment of Yankee Rd to Salzman Rd will allow trucks to take the shorter route south to SR 63 to access I-75 instead of traveling north to SR 122 121262~|~1~|~1~|~01/NHS~|~Resurfacing SR 36 120066~|~1~|~1~|~01/NFA~|~NEVI Round 2 275-A 102031~|~1~|~3~|~03/NHS~|~This plan split is in the NHS route. 102031~|~1~|~2~|~02/S<2~|~This plan split if for small urban culvert 102031~|~1~|~1~|~01/STR~|~This plan split is for STP Rural 102069~|~1~|~1~|~01/BRF~|~Markell Road bridge replacement work 102069~|~1~|~2~|~02/BRF~|~Markell Road bridge replacement work 95753~|~1~|~1~|~01/STR~|~LUC-20A from SLM 0.00 to SLM 2.23 106351~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair project. DSR MOE-003, MOE CR 81 2.87. Funded 100% federal ER funds. 84556~|~1~|~1~|~01/SAF~|~Intersection Improvement 84556~|~1~|~3~|~03/SAF/CITY~|~Water line work, related MOT and associated pavement repairs for the City of Sandusky. 84556~|~1~|~2~|~02/SAF/ERIE~|~Valve Box/manhole/ect. adjustments that are the responsibility of Erie County. Erie County Waterline Relocation. 110484~|~1~|~1~|~01/SAE~|~Project to upgrade the signal by installing mast arms, backplates, and battery back up. 110484~|~1~|~2~|~02/SAF~|~To pay for pull boxes which the City of Dayton has requested in lieu of conduits 100441~|~1~|~1~|~01/NHS~|~Deck Sealing7300964 SCI 52 17130 L 7300999 SCI 52 17130 R 7301022 SCI 52 17200 E 7301057 SCI 52 17200 L 7301081 SCI 52 17200 R 7301111 SCI 52 17200 F 7301170 SCI 52 17850 D 7301200 SCI 52 17850 L 7301235 SCI 52 17850 R 7301294 SCI 52 18100 L 7301774 SCI 52 28000 N 7301839 SCI 52 29300 L 7301863 SCI 52 29300 R 79315~|~1~|~2~|~02/S>2~|~Federal/state funding for general system paving:FRA-317: 0.70-2.13, 2.69-3.03, 3.36-5.4302/S>2/PV/F_ST 79315~|~1~|~1~|~01/S>2~|~Federal/local urban paving in Columbus for:FRA-317: 0.34-0.70, 2.13-2.69, 3.03-3.3601/S>2/PV/F_LC 79315~|~1~|~3~|~03/S>2~|~Federal/state funding for concrete deck overlay 317 over RRSFN 2516233, FRA-317-2.40, over CSX & NS RRDeck sealing-SFN 2516217, FRA-317-0.37, over Big Walnut Ck03/S>2/BR/ 79315~|~1~|~4~|~04/S>2~|~100% local (Columbus) funding for pavement repair04/S>2/PV/Col 98109~|~1~|~1~|~01/S>2~|~Construction of a new roadway to connect Elmore Street, west of IR-74, to Central Parkway, east of IR-74 and near Cincinnati State Technical College, including construction of a structure crossing the Mill Creek and IR-74. 124778~|~1~|~1~|~01/S>2~|~Replace bridge FRA-62-9.21 94724~|~1~|~1~|~01/NHS~|~For SR-2 and Holland-Sylvania intersection 84351~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE SR 145 8.50-17.87. Federal 80% State 20% STP. 115534~|~1~|~1~|~01/NFP~|~Created for J&C involvement 122228~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-90-A 96662~|~1~|~1~|~01/STR~|~Replace culverts: GRE-235-0244, GRE-235-0275, CLI-729-1611; various patching to CLI-68-0058 114323~|~1~|~1~|~01/STR~|~Bridge rehab. 93279~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 7BPB/4PS7(20% State) - See CAP comments - Rehabilitation on 1601024 COS SR 60 14.46 Intersect: Walhonding River; Not BR Eligible for Rehabilitation: Length=291 SD/FO(0) SR=76.2 DSR=5 98160~|~1~|~1~|~01/S>2~|~The project consists of widening Kauffman Avenue (SR-444), from Euclid Avenue to Lindberg Drive, from 3 lanes to 4 lanes. Also replacement of the existing traffic signal at Kauffman and Garland with mast arms, repair of deteriorated sections of asphalt and concrete pavement, drainage improvements, storm culvert extension, and replacement of a section of the adjacent Wright Brothers Huffman Prairie Bikeway. 84632~|~1~|~1~|~01/STR~|~ADA SR41 25.21 - 34.46 Resurfacing Project On SR41, begin @ its intersection w/SR32, north east and terminate at the Highland Co. line (SLM 25.21 - 34.46), it is proposed to resurface the existing pavement with asphalt conrete All Brdgs are pave thru. 01011567, 29.81 01011443, 26.02 01011494, 27.72 01011540, 29.72 01011451, 26.75 80/20 split 01/STR/PV/State 83927~|~1~|~1~|~01/STR~|~Resurface the existing roadway along with other roadway related items on LOG SR 235 from SLM 8.18 to 17.43 segment length 9.25 total lane miles 18.50. 83927~|~1~|~2~|~02/S<2~|~Resurface the existing roadway, along with other roadway related items on LOG SR 235 SLM 8.18 to 17.43 segment length 9.25 total lane miles 18.50. 115364~|~1~|~1~|~01/ENH~|~Multi-use path funded by Safety and TAP funds 87733~|~1~|~3~|~03/S<2~|~Microsurface the ixisting roadways as preventative maintenance New Bremen AUG SR 66 from SLM 4.58 to 5.35 (segment length 0.770 total lane miles 1.54) and ST Marys AUG SR 66 from SLM 10.29 to 10.67 (segment length 0.380 total lane miles 0.76) 87733~|~1~|~2~|~02/NHS~|~Microsurface the existing roadway as preventative maintenance on LOG US 68 from SLM 2.28 to 5.70 (segment length 3.42 mile total lane miles 6.84) and on CHP US 68 from SLM 1.27 to 5.08 (segment length 3.81 total lane miles 8.42). 87733~|~1~|~1~|~01/STR~|~Microsurface the existing roadway as preventative maintenance on: MER SR 49 from SLM 5.10 to 13.93 (segment length 8.83 Mile total lane miles 17.65) SHE SR 29 from SLM 3.82 to 7.64 (segment length 3.82 total lane miles 7.64), and AUG SR 66 SLM 5.35 to 10.29 (segment length 4.94 total lane miles 9.88) 117066~|~1~|~1~|~01/NHS~|~Added plan split. 85035~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 14 3.61, SFN 8431132. Replace an Ohio Bridge Single span truss on the existing location with a prestressed concrete box beam on new or rehabilitated abutments. Minor approach work will be required to adjust the road profile and width. 80% Federal, 15% Credit Bridge (Federal) and 5% Local. 119516~|~1~|~1~|~01/S>2~|~Widening of 1.3 miles of Cassady Avenue to 3-lanes from Plaza Properties Blvd to Agler Rd. 120400~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established 120916~|~1~|~1~|~01/BRO~|~Repair culvert type bridge carrying SR 172 over West Fork Little Beaver Creek by field paving the invert. 113933~|~1~|~1~|~01/S<2~|~Small City funded items- Pavement 98670~|~1~|~1~|~01/STR~|~PIK TR 665 - 0.27 (SFN 6633439) 99217~|~1~|~1~|~01/NFA~|~Adding event for J&C Funding. 119090~|~1~|~1~|~01/BRF~|~CEAO LBR funding eligible work to replace the structure (bridge SFN 1830872). 117505~|~1~|~1~|~01/BRO/BCEO~|~Complete replacement of the existing bridge. Improvements to approach roadway including upgrades to guardrail. 93234~|~1~|~1~|~01/MPO~|~Add amenities (statues, plaques, lighting, etc) to the Salem Avenue Bridge over the Great Miami River. 113309~|~1~|~1~|~01/NHS~|~Signal reconstruction of FRA SR161 at Huntley/Sinclair 115826~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 115826~|~1~|~2~|~02/IMS~|~Plan Split for aesthetic bridges enhancements requested by the city beyond eligible project costs 115826~|~1~|~3~|~03/IMS~|~Plan split for utility relocation costs that are not project eligible. 102682~|~1~|~1~|~01/NFP~|~Facilities special project. SAC LBP7 funds from Central Office. 83899~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items. MIA-SR-185 0.000 to 7.82 MIA-SR-48 9.240 to 9.640 83899~|~1~|~2~|~02/S<2~|~Resurface the existing roadway, along with other roadway related items. MIA-SR-185 7.82 to 8.71. 119586~|~1~|~1~|~01/NHS~|~added plan split. 105381~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers. 105381~|~1~|~1~|~01/IMS~|~AC overlay with repairs 105381~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 100581~|~1~|~1~|~01/STR~|~PIK 104 0.00-6.52 107532~|~1~|~1~|~01/NHS~|~Resurfacing COL-30 110667~|~1~|~1~|~01/STR~|~All the work in the project is in this plan split. Uses state funds from the District Preservation Program budget. 103002~|~1~|~1~|~01/NFA~|~Purchase order for asphalt paving of Racetrack Rd. at Friendship Park, Jefferson County. 116175~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads. 113610~|~1~|~1~|~01/SAF~|~This project includes radar detection units to provide enhanced vehicle detection at 9 signalized intersections: SR 73 @ Sharts Rd/Greenwood Ln, Pioneer Blvd, Clearcreek Franklin Rd, and Springwood Rd. SR 741@ SR 73, Lytle-Five Points Rd, Remick Blvd, and Pennyroyal Rd. Stop bar radar detection is proposed for minor streets and major street left turn lanes (protected/permissive) and advance radar detection is proposed for arterial (SR 73, SR 741) and collector routes. 120145~|~1~|~1~|~01/MPO~|~install electric Vehicle charging infrastructure at Civic Center Drive Complex Facility 100436~|~1~|~1~|~01/STR~|~HIG 135 0.00-2.82 100436~|~1~|~2~|~02/S<2~|~HIG 28 (15.43-16.92) 100436~|~1~|~3~|~03/STR~|~HIG 135 2.40 (SFN3602761) 100436~|~1~|~4~|~04/S<2~|~HIG 28 16.83 (SFN3600424) 92155~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance Funds for one year Landscape Maintenance Contract 115505~|~1~|~1~|~01/MPO/LOWE~|~Construct McGaffney St Extension, Phase 2 115505~|~1~|~2~|~02/MPO/LOWE~|~Construction of new culverts along McGaffney Road extension. 104695~|~1~|~1~|~01/S>2~|~Rebuild intersection in the City of Hamilton. 93470~|~1~|~1~|~01/STR~|~Repair of deck edges, patching wing walls, refacing abutments, patching pier cap endas and encasing pier columns on SFN 1102613 CHP 296 0021 on Kings Creek, SFN 1102648 CHP 296 0122 on Kings Creek Tributary, SFN 1102672 CHP 296 0212 on Kings Creek, and SFN 1102737 CHP 296 0866 on Kings Creek 97465~|~1~|~1~|~01/S<2~|~Landslide repair by installing a Hpile retaining wall. Type A emergency contract. 114985~|~1~|~1~|~01/NFA~|~Detailed plan splits will be addressed during design 120112~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 16 and York Road 100905~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete SR 66 in Auglaize County SUG SR 66 SLM 13.14 to 22.41 100905~|~1~|~2~|~02/S<2~|~Overlay with asphalt concrete SR 66 in Auglaize County AUG SR 66 12.50 to 13.14 119351~|~1~|~1~|~01/S>2~|~Resurfacing 115377~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4. 112813~|~1~|~1~|~01/NHS~|~Resurfacing US 250 119338~|~1~|~1~|~01/STR~|~Plan Split for general system spot repairs 117971~|~1~|~1~|~01/NFP~|~Created for J&C involvement 121577~|~1~|~1~|~01/S5K~|~Roadway improvements on Dresden Ave. utilizing Small City (4B97) Federal funds at 95%. 5669~|~1~|~2~|~02/S>2~|~Urban pavement relocation 5669~|~1~|~3~|~03/STR~|~Rural pavement relocation 5669~|~1~|~1~|~01/BRO~|~80/20 fed/local funding split for all bridge work. Old SFN: 4337107. New SFN: ? 108344~|~1~|~1~|~01/STR~|~Asphalt resurfacing on SR 9, SR 39, SR 43 and SR 332 108344~|~1~|~2~|~02/NFA~|~Asphalt resurfacing at Leesville Lake for the Muskingum Watershed Conservancy District (MWCD). 108853~|~1~|~1~|~01/STR~|~Culvert replacement project. FY 2020. Rural other federal aid funded 80 federal/20 state. 107934~|~1~|~1~|~01/STR~|~All work in this split. Resurface on SR189 using district preservation funds (80% Fed and 20% State). 107759~|~1~|~1~|~01/STR~|~Covers all work to rehab bridge 103665~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 20.05. DSR MEG-001. 121969~|~1~|~1~|~01/S5K~|~Congestion improvements utilizing Carbon Reduction Federal funds at 80% up to the CAP. 119828~|~1~|~1~|~01/S>2~|~Pedestrian and crossing facilities on McNaughten Rd 119828~|~1~|~2~|~02/S>2~|~Pavement Maintenace on McNaughten Rd 116735~|~1~|~1~|~01/IMS~|~FRA-70-0.71 to 3.41 WB RESURFACINGFRA-70-0.00 to 4.78 WB & EB PAVEMENT REPAIR 104873~|~1~|~1~|~01/MPO~|~13th Street pavement replacement from Broad Avenue to Harrison Avenue, in the City of Canton, Stark County, Ohio. 114042~|~1~|~1~|~01/CMQ~|~Conversion of the existing 4 lane divided section of US 52 in New Richmond to one lane of traffic in each direction on the northbound side of pavement and construct a shared use path on the southbound side of pavement. Conversion of four existing intersections to roundabouts. 94685~|~1~|~1~|~01/STR~|~Landslide repair project using GSM funds. WAS 339 7.73-7.78. Rural other federal aid funded 80 federal/20 state. 108617~|~1~|~1~|~01/SAF~|~Signal upgrades. 105527~|~1~|~1~|~01/STR~|~Resurfacing. Work on SR 81 in Allen County from the SR 66 overlap to the Lima Urbanized Boundary at the bridge over McBride Creek at 10.71. All funds from the District Preservation Program budget. No local funds. 105527~|~1~|~2~|~02/S<2~|~Resurfacing. Work on SR 81 in Allen County from the Lima Urbanized boundary at the bridge over McBride Creek at 10.71 to Wapak Road at 11.34. All funds from the District Preservation Program budget. No local funds. 105527~|~1~|~3~|~03/NHS/LIMA~|~All resurfacing work in the City of Lima in Allen County. Work on SR 65 from 6.66 to Union Street at 6.80. Work on SR 117 from the intersection of Elm Street and Woodlawn Avenue at 15.34 to SR 65 at 16.87. The 80% federal funds in this plan split will be from the District Preservation Program budget. The 20% match will be provided by the City of Lima. The roadway sections in this split are no longer on the NHS. Urban STP funds will be used. 105527~|~1~|~4~|~04/NHS~|~All work that was in the Plan Split has been removed from this project. 105527~|~1~|~5~|~05/NFP/LIMA~|~Items paid 100% by the City of Lima. Auxiliary pavement markings, curb ramps and pavement repairs. 114675~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 114675~|~1~|~2~|~02/NFA~|~Created for J&C involvement 115764~|~1~|~1~|~01/BRF/CCTD~|~Replacement of SFY 1332260, which carries Pond Run Road over Ten Mile Creek. 86723~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys 86723~|~1~|~2~|~02/STR~|~Bridge Repairs 123540~|~1~|~1~|~01/STR~|~conduits linked 114821~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split 114821~|~1~|~1~|~01/STR~|~Rural Plan Split 122943~|~1~|~1~|~01/STR~|~Chip Seal Surface Course at NOB-CR-16-0.00 for 3.41 miles. 110378~|~1~|~1~|~01/S>2~|~Improve intersection of SR 3 (Westerville Rd) at Morse Rd 110378~|~2~|~2~|~02/SAE~|~Utility Work during Construction 113061~|~1~|~1~|~01/NHS~|~All work is in this split. 122893~|~1~|~1~|~01/NFP~|~All work included in this plan split. 96968~|~1~|~1~|~01/IMS~|~Spot paving on various routes in ATB, MAH and TRU Counties 87305~|~1~|~1~|~01/STR~|~generaly system resurfacing of HOL-39-24.24 to 32.19; included repair of mianline pavement and shoulder areas used for Amish buggies and pavement marking 109710~|~1~|~1~|~01/NHS~|~Concrete pavement repairs on: 113783~|~1~|~1~|~01/MPO~|~Construction of a shared use path on the north side of Smith Road from west of Beckett Park Drive to west of Beckett Road. 115680~|~1~|~1~|~01/BRF~|~Superstructure replacement of SFN 5134390 94432~|~1~|~1~|~01/STR~|~Bridge Rehabilitation 123861~|~1~|~1~|~01/SAE~|~Preemption at the intersection of Harris Avenue and Forrest Avenue in the city of Norwood 88772~|~1~|~1~|~01/STR~|~Deck overlay with micro silica on SFN 5504775 MIA SR 721 0393. 102036~|~1~|~1~|~01/ENH~|~COC DOP Utility Pole relocation 77440~|~1~|~1~|~01/NHS~|~Resurfacing 115817~|~1~|~1~|~01/SAF~|~Guardrail 121396~|~1~|~1~|~01/S5K/Shby~|~Reconstruction of Mickey Road 121480~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay Fed/City Split 121480~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs 100% City Split (Items Such as Pavement Repairs, Reclamite, etc.): 106510~|~1~|~1~|~01/NFA~|~The project will line the existing structure with a Con Tech Bridgecor Arch Structure 116358~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 118175~|~1~|~1~|~01/NHS~|~Safety Items 102754~|~1~|~2~|~02/STR~|~General maintenance on NHS bridges. 102754~|~1~|~3~|~03/S>2~|~Drainage system repair. 102754~|~1~|~4~|~04/IMS~|~Plan split for HAM-71-0320 McMillian Street over I-71 Barrier Collision damage repair. All costs associated with the location shall be billed to this plan split for insurance reimbursement purposes. 102754~|~1~|~1~|~01/IMS~|~General maintenance on the BUT-75 bridges including associated approach work. This plan includes the cost for the base option barrier and fence on these bridges, and the alternate bid for the aesthetic upgrades to the barrier and fences. HAM-71-0320 is in a separate plan split. 119734~|~1~|~1~|~01/BRF/HAM~|~Demolition of the South G Street bridge (SFN 0960306) in the City of Hamilton. 102828~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes 81467~|~1~|~1~|~01/NHS~|~Rehabilitate Bridge HAM-562-0065 (SFN 3113841) over SR 4. Work includes deck replacement, paint, and minor widening to accomodate MOT. 96482~|~1~|~1~|~01/IMS~|~Deck replacement and widening of SFN 4807081 ( L ) & 4807081 ( R ) over Monclova Road and NS RR 95566~|~1~|~1~|~01/MPO~|~Demolition of on structure associated with Seiberling Way project. In the City of Akron, Summit County, Ohio. 91893~|~1~|~4~|~04/IMS~|~"04/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP -Deck Sealing on Gue-IR 77: 1) SFN 3002675; 2) SFN 3002764; 3) SFN 3002829; 4) SFN 3002942; 5) SFN 3002977; 6) SFN 3003000; 7) SFN 3003035; 8) SFN 3000273; 9) SFN 3003094; 91893~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP for lighting at Gue-77/209 Interchange 91893~|~1~|~5~|~05/IMS~|~"05/IMS/PV/ " - Facilities Rest Area Funding 4BR7(100% State) - No CAP -Resurfacing with repairs of Gue-IR 77 NB Rest Area Park 29. 91893~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue-SR 209-14.57 to 15.07; 91893~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP -Resurfacing on Gue-IR 77-02.50 to 11.70 107481~|~1~|~1~|~01/STR~|~AC Overlay without repairs 123071~|~1~|~1~|~01/SAF~|~Install a SUP along the north side of Eakin Road from Wayne Ave to Whitethorne Ave and the south side of Eakin Road from Whitethorne Ave to Harrisburg Pike (US 62). 98102~|~1~|~1~|~01/NFP/PCEO~|~Replacement of the existing steel truss bridge carrying TR 445 (Sonora Road) over Twin Creek (SFN: 6837255). 101080~|~1~|~2~|~02/S<2~|~Overlay various routes in Miami County with fine graded aggregate: MIA SR 55 SLM 13.01 to 13.70 = = MIA SR 202 SLM 11.24 to 11.62 = = MIA SR 571 SLM 20.84 to 22.08. 101080~|~1~|~1~|~01/STR~|~Bridge preventive maintenance. 113921~|~1~|~1~|~01/BRF~|~CEAO Funded items 95758~|~1~|~1~|~01/STR~|~OTT-269 from SLM 1.50 to 3.94 118505~|~1~|~1~|~01/MPO~|~Federally eligible items. 118505~|~1~|~2~|~02/MPO~|~Ineligible utility work. 95296~|~1~|~1~|~01/IMS~|~SFN 4803183 Oakwood Ave bridge over I-75. 91147~|~1~|~1~|~01/IMS~|~FRA-71: 25.62-28.72 pavement resurfacing 107817~|~1~|~1~|~01/S<2~|~Emergency landslide repair. 114419~|~1~|~1~|~01/STR~|~Resurfacing SR 212 92131~|~1~|~1~|~01/STR~|~resurface OTT SR 105 0.00-11.09 - Sandusky County line to SR-19 92131~|~1~|~2~|~02/STR~|~One culvert at 3.15 94404~|~1~|~3~|~03/NHS~|~SLM 0.00 - 0.27 94404~|~1~|~1~|~01/STR~|~Resurfacing SLM 1.05 - 1.61 94404~|~1~|~2~|~02/S<2~|~SLM 0.27 - 1.05 (Galion) SLM 1.61 - 3.91 (Mansfield(Richland)) 120383~|~1~|~2~|~02/S5K~|~Urban Paving plan split 120383~|~1~|~1~|~01/S5K~|~Small City funds for Oak Harbor Rd (CR 19) and Moore St (MR 557) 120383~|~1~|~3~|~03/NFP~|~Plan Split for 100% locally funded scope items, including non-eligible Urban Paving items and water line improvements. 86928~|~1~|~1~|~01/SAE~|~Signal at SR532 120795~|~1~|~1~|~01/BRO/SUCE~|~Bridge replacement. 112956~|~1~|~1~|~01/STR~|~Overlay on ROS 41 & 50 112956~|~1~|~2~|~02/STR~|~Bridge PM. 123565~|~1~|~1~|~01/SAE~|~Replacing R-WR striping 117251~|~1~|~1~|~01/SAF~|~remove and replace all type A guardrails 84596~|~1~|~3~|~03/S>2~|~Resurfacing SR5 4.93-8.15 and 14.89-15.71 84596~|~1~|~1~|~01/STR~|~SFN 6700241 11.40 SR5 over mahoning river. SFN 6700276 12.34 SR5 over mahoning river. 84596~|~1~|~2~|~02/S>2~|~SFN 6700306 14.97 under camp ravenna RR S. SFN 6700217 6.24 SR5 over hinkley creek. SFN 6700187 5.58 over W BR mahoning river. SFN 6700160 4.62 SR5 over mahoning river. 84596~|~1~|~4~|~04/STR~|~Resurfacing SR5 8.15-14.89 95589~|~1~|~1~|~01/CMQ~|~Bike/Hike path. CMAQ funds from the Lima-Allen County Regional Planning Commission. The CMAQ eligiblity was approved in an April 14, 2014 letter. 124814~|~1~|~1~|~01/SAF/JEF~|~Guardrail upgrades utilizing CEAO HSIP (4HB7) funding at 100%. 107267~|~1~|~1~|~01/S>2~|~Slide repair work eligible for federal/state funding 114469~|~1~|~1~|~01/NFA~|~Resurfacing HAS-258 and TUS-258 from SLM 16.55 to SLM 20.90 114469~|~1~|~2~|~02/STR~|~Resurfacing TUS-258 from SLM 20.90 to SLM 21.23 96472~|~1~|~1~|~01/NFP~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2014-2015 used for construction inspection services. 109517~|~1~|~3~|~03/MPO~|~Split for MPO funded work on Liberty Road 109517~|~1~|~1~|~01/SAF~|~Reconstruction and widening work on SR-43 eligible for safety funds. 109517~|~1~|~2~|~02/NHS~|~Split for urban paving funding on SR-43 109517~|~1~|~4~|~04/NFP~|~Work in the project that is 100% local cost such as waterwork and paving/repairs on local streets. 85216~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all pavement work using federal STP funds. 85216~|~1~|~2~|~02/STR~|~Work on 2 culverts: 285281632 and 285281637 95376~|~1~|~1~|~01/BRF/PCE~|~Replacement of High Street Bridge, sfn#6733972 over the Cuyahoga River, Portage County, Ohio. 120792~|~1~|~1~|~01/NHS~|~Safety items 110978~|~1~|~1~|~01/NFP~|~CE plan split 99607~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 124542~|~1~|~1~|~01/NHS~|~Roadway reconstruction. 124542~|~1~|~2~|~02/BRO~|~Bridge Rehabilitation. 108712~|~1~|~1~|~01/NFA~|~Bridge Replacement 116577~|~1~|~1~|~01/SAF~|~Convert all-way stop-controlled intersection into single-lane roundabout at MED-162-20.06/River Styx Rd (CMAQ/TSMO) 116577~|~1~|~2~|~02/SAF~|~Medina County Sanitary Engineer for water main relocation on ODOT 98733~|~1~|~1~|~01/NFP~|~Plan split for federal funds used for safety signs on US BR 50 119159~|~1~|~1~|~01/IMS~|~All work included in this split. 105851~|~1~|~1~|~01/IMS~|~Demo buildings related to the BSB project. 114908~|~1~|~1~|~01/STR~|~Spot Repairs on a rural road 98565~|~1~|~2~|~02/STR~|~Plan split for Rural section of CLE-749: SLM 0-2.38 98565~|~1~|~3~|~03/S>2~|~Plan split for Large Urban section of CLE-749: SLM 2.38-5.51 98565~|~1~|~1~|~01/NFA~|~Plan split for the Non Fed Aid section of CLE-743: SLM 0-0.07SLM 0.45-3.65 121908~|~1~|~1~|~01/ERD~|~Improvements to the intersection of SR 741 and Lytle Five Points in Springboro. Addition of turn lanes and pedestrian crossing improvements. 97768~|~1~|~1~|~01/IMS~|~SFN 5704925, MOT-70-0452, C11 (Brookville Phillipsburg Pike) 1. Remove exisiting LMC overlay and replace with SDC concrete using hydrodemolition. 2. Replace expansion joint seals. 3. Use SCC mix to patch railing, abutments, piers, backwalls and wingwalls. 4. Seal concrete surfaces. SFN 5704952, MOT-70-0553, T-23 (Wellbaum Road) 1. Remove existing LMC overlay and place SDC overlay using hydrodemolition. 2. Use SCC mix to patch backwalls. 3. Clean and seal expansion joints. 4. Seal concrete surfaces. SFN 5705045, MOT-70-0662 C17 (Diamond Mill Road) 1. Overlay existing deck with latex modified concrete using hydrodemolition. 2. Fix railing and bridge fence. 3. Patch abutments using SCC patching material. 4. Seal concrete surfaces. 97768~|~1~|~2~|~02/NHS~|~Work to include NHS Bridge # MOT-49-1065 L SFN 5704448 98485~|~1~|~1~|~01/NHS~|~MED-224-0.00-6.41 Resurfacing 113894~|~1~|~1~|~01/NFA~|~Resurfacing 87344~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal)/ 4SS7(20% State) - CAP of $1,298,333.00 - Located FAI SR158 3.75-3.88 with treatment including cutting back rock face; improved rockfall containment; pavement repairs and resurfacing as required 108377~|~1~|~1~|~01/NHS~|~Mill and fill in the City of Bellefontaine. 108377~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 93602~|~1~|~1~|~01/IMS~|~I-75 SB rest area 119925~|~1~|~1~|~01/IMS~|~Restriping along IMS routes in D05 111373~|~1~|~1~|~01/NFA~|~Widening of Columbia Road. 104680~|~1~|~1~|~01/NFP~|~ADA CR VAR GR 96890~|~1~|~1~|~01/NHS~|~Installation of Median Cable Barrier along SR-5 and SR-82 in Trumbull County, Ohio. 118776~|~1~|~1~|~01/NHS~|~added plan split. 89448~|~1~|~1~|~01/STR~|~District Pavement Marking project. 96856~|~1~|~1~|~01/SAE~|~Install new and upgrade existing guardrail on various county roads. 101142~|~1~|~1~|~01/IMS~|~Overlay I-75 in Miami County with asphalt concrete: MIA IR 75 SLM 0.00 to 4.92 110003~|~1~|~1~|~01/NHS~|~LOOPs 103868~|~1~|~1~|~01/NFA~|~The PORT will construct a full depth reclamation of approximately one mile of Guernsey Street which is a two lane road, in the Village of Bellaire. 122490~|~1~|~1~|~01/NFA~|~Resurfacing project on NOB CR 19 0.00-2.207. Funded through the Local Roads Oil and Shale Program. 123479~|~1~|~1~|~01/NHS~|~Federally eligible items. 114584~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 555 15.60. Work includes drilled shaft wall. 100261~|~1~|~1~|~01/MPO~|~Resurface North State Street using MPO STP funding including work to incorporate share bicycle lanes in both directions. 115029~|~1~|~1~|~01/STR~|~ASD SR 0060 14.97-Culvert Replacement 109450~|~1~|~1~|~01/IMS~|~Minor bridge work. 109450~|~1~|~2~|~02/NHS~|~Bridge rehab. 109450~|~1~|~3~|~03/S>2~|~Minor bridge work. 90771~|~1~|~1~|~01/SAF~|~Sidewalks, curb cuts, ADA curb ramps, upgrade of traffic signal control equipment, and ditch enclosure work at Meijer Drive on State Route 741 from SLM 5.80 Orchard Run Road to Moraine's South Corporation Limit SLM 6.20. 90771~|~1~|~2~|~02/S>2~|~Resurfacing and other roadway related items 105909~|~1~|~1~|~01/IMS~|~Plan split for interstate bridge work 96484~|~1~|~1~|~01/IMS~|~new interchanges 96484~|~1~|~2~|~02/NFA~|~The TID is constructing the I-475 @ US20A Project including, but not limited to , roadwork improvements by constructing a new interchange at US 20A and I-475 119776~|~1~|~1~|~01/SAF~|~Widen Trenton Franklin Rd (CR-81), install rumble stripes, and remove fixed objects within the clear zone. 85146~|~1~|~1~|~01/BRO~|~Split for all work on this structure using system preservation funds. 123412~|~1~|~1~|~01/STR~|~Resurfacing SR 800 124016~|~1~|~1~|~01/NHS~|~Double Application Microsurfacing on LOR-18-0.00 to 5.721 124016~|~1~|~2~|~02/STR~|~Single Application Microsurfacing on MED-301-8.189 to 10.191 96730~|~1~|~1~|~01/STR~|~STP Rural Micro: LOR-58-8.42 to 13.89 96730~|~1~|~2~|~02/NHS~|~NHS Micro: ASD-224-0.00 to 6.56 122976~|~1~|~1~|~01/SAF/Ont~|~Convert two-way stop-controlled intersection into a single-lane roundabout. 99585~|~1~|~1~|~01/NHS~|~Split for all resurfacing work funded with 80% federal and 20% state 94465~|~1~|~1~|~01/STR~|~Preventive Maintenance SmoothSeal 98528~|~1~|~2~|~02/SAF~|~Systematic Sign Replacement LOR-57-12.50 ? 12.86. 98528~|~1~|~1~|~01/NFP~|~Systematic Sign Replacement 115789~|~1~|~1~|~01/NFA~|~Created for J&C inivolvement 113076~|~1~|~1~|~01/NHS~|~Fine Poly AC Overlay 96597~|~1~|~1~|~01/BRO~|~Replace existing slab superstructure on bridge COL-164-2444 (SFN 1505165) with new slab superstructure. Replace pier caps. 110604~|~1~|~1~|~01/NFP~|~Plan split for mowing work 123236~|~1~|~1~|~01/NHS~|~Resurfacing 105551~|~1~|~1~|~01/NHS~|~FAY-62-14.61 to 15.49 105551~|~1~|~2~|~02/S<2~|~FAY-62-11.88 to 12.03 105551~|~1~|~3~|~03/STR~|~FAY-62-15.49 to 26.74 98927~|~1~|~1~|~01/NHS~|~Culvert Repair: HUR-20-15.02 (CFN 390200078), WAY-21-00.10 (CFN 1803931) 99925~|~1~|~1~|~01/SAE~|~100% CEAO funding for guardrail on county roads 95852~|~1~|~1~|~01/NFA~|~Resurfacing of Bishop Road (TR-132) from Old State Route 534 to LaFever Road, in Harpersfield Township, Ashtabula County, Ohio. 109038~|~1~|~1~|~01/ENH~|~Sidewalk project 109038~|~1~|~2~|~02/ENH~|~Sidewalk Project 102019~|~1~|~1~|~01/NHS~|~Geological Site Management Funding - 4SF7 (80% Federal)/4SS7 (20% State) - Rock Scaling at FAI-37-14.24. 96513~|~1~|~1~|~01/IMS~|~Resurfacing. 96513~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance. 98474~|~1~|~1~|~01/STR~|~Funds from the District Preservation Program budget. Rural STP. 98474~|~1~|~2~|~02/NHS~|~For work outside the City of Lima but inside the Lima Urbanized Area on the NHS. Funds from the District Preservation Program Budget. No local funds. 119854~|~1~|~1~|~01/S>2~|~Pedestrian improvements along SR 161 93064~|~1~|~1~|~01/NFP~|~Facilities project 122741~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope 122741~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded scope, such as water line replacement. 107071~|~1~|~1~|~01/NFA~|~Various CR guardrail in Adams County. 93754~|~1~|~1~|~01/IMS~|~01/IMS/BR/ ; ALL/HAN-75-22.68/0.01; 90% Fed (4PF7) - 10% State (4PS7) - No Cap 112800~|~1~|~2~|~02/NHS/GROV~|~Urban Paving within Grove City 112800~|~1~|~1~|~01/NHS~|~NHS Plan Split on SR 665. 112800~|~1~|~3~|~03/S>2~|~Plan split for concrete pavement repairs only, in Grove City. 112800~|~1~|~4~|~04/S>2~|~Plan split for concrete pavement repairs only, outside Grove City. 88947~|~1~|~1~|~01/STR~|~SR193 0.64 SFN 0405078 over pymatuning creekSR193 13.61 SFN 0405493 over mill creek 102043~|~1~|~1~|~01/NHS~|~Rockfall remediation on LAW 7 0.66 & LAW 52 12.32 87838~|~1~|~1~|~01/STR~|~LAW CR12/CR18 Guardrail ProjectIt is proposed to install new guardrail along 4.3 miles of CR 12 and 3.1 miles of CR 18 in FY15. 100% safety furnds from CEAO01/STR/OT/Law 119592~|~1~|~1~|~01/ERD/BLUE~|~Construction of a new roadway connecting Reed Hartman Highway and Grooms Road. 119896~|~1~|~1~|~01/STR~|~Plan split for slide repair 103261~|~1~|~1~|~01/SAF~|~District Wide fast drying pavement markers. 101012~|~1~|~2~|~02/IMS~|~Bridge rehabilitation treatments 101012~|~1~|~1~|~01/IMS~|~Resurfacing and related roadway work. 111570~|~1~|~2~|~02/NHS~|~NHS 111570~|~1~|~1~|~01/S>2~|~2 1/2" mill and fill with superpave asphalt on:MOT-835 SLM 1.64 to 2.73in the City of Kettering. 105235~|~1~|~1~|~01/NFP~|~Resurfacing of STA US 30 from 25.84 to 31.96 and STA SR 619 from 14.74 to 16.44. 105235~|~1~|~2~|~02/NFP~|~Minor bridge work > 20' span. 105235~|~1~|~3~|~03/NFP~|~Minor bridge work 10' to 20' span. 105235~|~2~|~4~|~04/NFP~|~Culvert work. 105235~|~1~|~5~|~05/SAE~|~Adding rumble stripes. 104688~|~1~|~1~|~01/S<2~|~SCI CR 2 0.00-1.06 widening. 93378~|~1~|~1~|~01/BRF~|~Rehabilitation of three span prestressed concrete box beam bridge over Wolf Creek. Project consists of replacing the piers and superstructure. Abutments will be evaluated. Minor approach work and channel protection along with possible replacement of retaining wall on approach on SFN 5765366 MOT M0125 3.47 Broadway Street Bridge. 95479~|~1~|~1~|~01/NFP~|~Plan split for 100% state funded culvert work District Preservation Program Funds SAC 4PS7. 111272~|~1~|~1~|~01/NFA~|~ODNR Shawnee State Forest. 107408~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work 107408~|~2~|~2~|~02/IMS~|~Plan split for bridge repair work. 13108~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of 1) 4201388 KNO US36 15.9 Intersect: Brannican Run; Not BR Eligible for Rehabilitation: Length=12 SD/FO(0) SR=79.4 DSR=" "; 2) 4201418 KNO US36 16.42 Intersect: Trib Of Kokosing River; Not BR Eligible for Rehabilitation: Length=12 SD/FO(1) SR=46.9 DSR=" "; 105339~|~1~|~1~|~01/STR~|~Microsurface on rural routes: MIA SR 41 SLM 0.00 to 5.68 & MIA SR 48 SLM 16.88 to 19.40. 77158~|~1~|~2~|~02/NFA~|~Complete Phase 2 of Farm rd. connector by extending farm Rd. from GKN, Sinter Drive and ending at SR 7, via parts of Second St. 100% Local. 77158~|~1~|~1~|~01/ENH~|~Complete Phase 2 of Farm rd. connector by extending Farm Rd. This split includes construction of bike path. Federal/Local 80/20% Enhancement funds. 111293~|~1~|~1~|~01/SAF~|~"01/SAF/OT/COSH" - 90% Federal (4hj7) and 10% State (4BG7) - upgrade of signal equipment within city of Coshocton. 105490~|~1~|~1~|~01/IMS~|~Bridge deck edge repair and railing replacement on IR 77 over SR 209, Pier patching on CR 43 over IR 77. 92556~|~1~|~1~|~01/SAF/MHY~|~Widen US127 to provide a northbound left turn lane into Kemper Lane in Mt. Healthy. This plan split also includes the water works include work paid as contract cost. 92556~|~1~|~2~|~02/S<2~|~Change order work to be paid by the Cincinnati Water Works. 107994~|~1~|~1~|~01/NFP~|~Resurface parkways eligible for State Metroparks funds 100382~|~1~|~1~|~01/STR~|~Uses District Capital preservation allocations to resurface SR231 from SLM3.04 to 10.34. 98265~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for Gue-70-1654L/R 100830~|~1~|~1~|~01/STR~|~Rehab Bridge PRE SR 122 24.36 by painting the pier piling with OZEU apecifications. Temporary work below the Ordinary High Water Mark (OHWM) will be necessary. 117783~|~1~|~1~|~01/BRO~|~Split for bridge work 118975~|~1~|~1~|~01/SAF~|~Plan split for pavement markers and RPMs. 113940~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 33 22.13-29.10. Major 2 funds. 110603~|~1~|~1~|~01/NHS~|~All items of work associated with the resurfacing of US 23. The work includes pavement repairs, guardrail work, drainage work and other miscellaneous items of work. 85400~|~1~|~2~|~02/NHS~|~100% local participation items of work such as curb ramps, etc. 85400~|~1~|~1~|~01/NHS~|~Split for all Urban Paving eligible work. 102103~|~1~|~1~|~01/ERD~|~Widening of MAH/TRU SR-46. 115689~|~1~|~1~|~01/NHS~|~NHS paving split 100294~|~1~|~2~|~02/S<2~|~Single and Double Microsurfacing to ATB SR 45 23.00 to 24.08, ATB SR 531 1.98 to 6.86. 100294~|~1~|~1~|~01/STR~|~Single and Double Microsurfacing to ATB SR 45 14.61 to 19.75 and 22.28 to 23.00. 122510~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes 97269~|~1~|~1~|~01/NFP~|~Trumbull County MetroPark District parking lot at North Road Nature Preserve 99814~|~1~|~1~|~01/ENH~|~Installation of two Rectangular Rapid Flashing Beacons (RRFB) at the crosswalk near Wooster Pike and Belmont Avenue. Construction of a raised median to provide pedestrian refuge. Replacement of sidewalk on the south side of Wooster Pike between Belmont and Harvard Acres. 118781~|~1~|~1~|~01/STR~|~added split. 116433~|~1~|~1~|~01/SAF~|~Signal, concrete walks, and pavement markings 118149~|~1~|~1~|~01/STR~|~Landslide repair. 93498~|~1~|~1~|~01/BRO~|~80% County LBR w/20% Local matching funds for a BR eligible structure replacement of SFN 4342542. 80138~|~1~|~1~|~01/NHS~|~Paint structural steel on bridge that carries SR 7 over Alexander Street. 95718~|~1~|~1~|~01/NHS~|~SAN-20 from SLM 2.73 to SLM 15.29 95718~|~1~|~2~|~02/NHS~|~Bridge on SAN-20 @ 3.18 95718~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded items requested by the Village 112413~|~1~|~1~|~01/IMS~|~plan Split to resurface WAR-71 112413~|~1~|~2~|~02/SAE~|~Median cable barrier. 103674~|~1~|~1~|~01/SAE~|~Guardrail upgrades/replacements on various county routes throughout Mahoning County. 122357~|~1~|~1~|~01/CMQ~|~Plan split for construction of a new all-purpose trail. 122357~|~1~|~2~|~02/ENH~|~Plan split for the STBG set-aside transportation alternatives eligible funded work. 91995~|~1~|~2~|~02/STR~|~HIG US62 17.73 - 27.67 91995~|~1~|~1~|~01/S<2~|~HIG US 62 17.32-17.73 91995~|~1~|~3~|~03/STR~|~Bridge PM. 116829~|~1~|~1~|~01/S>2~|~Resurfacing 113720~|~1~|~1~|~01/SAF~|~Install roundabout at the intersection of SR-132 and SR-222 113720~|~2~|~2~|~02/SAF~|~100% local match for water line replacement outside of Batavia jurisdiction 86999~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 690 0.00-1.59 and VIN 327 0.00-4.94. Funded 80 federal/20 state. 86999~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. ATH 690 1.59-5.00 and HOC 374 17.80-25.15. Funded 100% State. 104003~|~1~|~1~|~01/SAE~|~Adding turn lane and change signal at 10C and I-480. 103449~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 260 6.12. 100% State funding. 121591~|~1~|~1~|~01/MPO/NORT~|~Resurfacing. 108176~|~1~|~1~|~01/NFA~|~ER Event - Repair landslide that occurred along SR 743. 124062~|~1~|~1~|~01/NFA~|~Bridge Replacement 105103~|~1~|~1~|~01/STR~|~Culvert ReplacementROS 138 10.98 CFN 1850766 119469~|~1~|~1~|~01/STR~|~Upgrade signs & pavement markings for Simon Kenton Trail 95684~|~1~|~1~|~01/MPO~|~Front St 88742~|~1~|~1~|~01/S<2~|~?01/S<2/PV/Ming? ? In Mingo Junction reconstruct, rehabilitate and resurface South Commercial Ave on existing line and grade from Wabash Ave to the south end of bridge over Cross Creek. Work includes curb, gutter, sidewalk repair, curb ramps. 121860~|~1~|~1~|~01/SAF~|~Plan split for intersection improvement work. 112983~|~1~|~1~|~01/IMS~|~Rehabilitate Bridge HAM-71-0427 which carries Blair Ave over I-71 by replacing the expansion joints, sealing the deck and substructure, painting the structural steel, installing spall protection, and improving the drainage under the structure. 91918~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. Funds for 1 year RPMs 104750~|~1~|~1~|~01/SAF~|~plan split 92378~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3006158 GUE SR541 7.46 Intersect: Over Wills Creek; BR Eligible for Rehabilitation: Length=273 SD/FO(1) SR=60.7 DSR=4 84571~|~1~|~1~|~01/STR~|~Rural Plan Split for TRU SR 45 21.17 to 26.41 88554~|~1~|~1~|~01/NHS~|~Concrete pavement repairs on SR 202 from Leo Street (SLM 0.83) to Dayton north coporation limit (SLM 1.99). 88554~|~1~|~2~|~02/NHS~|~Concrete pavement repairs on SR 202 SLM 1.99 to 2.06 in the City of Riverside. 88554~|~1~|~3~|~03/NHS~|~Curb ramp work to be paid 100% by the City of Dayton. 101875~|~1~|~1~|~01/BRO~|~Bridge Deck overlay on ATH 682 0004 (SFN 0500925). Federal (BR) funds 80% and 20% State. 101875~|~1~|~2~|~02/BRO~|~City of Athens to hang a sign off the bridge. Funded 100% Local 4BG7. 108017~|~1~|~1~|~01/NFP~|~Pruning 97999~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - plan split 01 for Fai-33-2270L 105300~|~1~|~1~|~01/IMS~|~plan split for the resurfacing work on BUT-75 103171~|~1~|~1~|~01/S>2~|~Construct left turn lane on SR162 approaching the Copley Circle. Construct a right turn lane on CR-17 (Cleveland/Massillon Road) approaching the Copley Circle, Copley Township, Ohio. 94154~|~1~|~1~|~01/NFP~|~Repair/replace culvert on SR-163 @ SLM 27.25 in Ottawa. 90796~|~1~|~1~|~01/MPO~|~Replacement of defective sidewalks, curbing, alley mouths, driveway approaches and curb ramps, install banners, benches, trash receptacles, tree grates and other assorted amenities, and repair, replacement and installation of landscaping on Watervliet Avenue from Mundale Avenue to Bellaire Avenue. 102438~|~1~|~1~|~01/IMS~|~Plan split for bridge painting at 90% federal/10% state. 111300~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer's FY2024 pavement marking project funded by CEAO. 4HB7 - see cap comments. 79753~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs MED-271-0.00 to 6.724 79753~|~1~|~2~|~02/IMS~|~Bridge Rehabilitation Work included with resurfacing project. 89261~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 92888~|~1~|~1~|~01/S>2~|~LOR-83C-0.15 TO 0.33 - Urbanized Area outside of City Fed/State 92888~|~1~|~3~|~03/S>2~|~LOR-10C-0.00 TO 0.20 LOR-10C-0.71 TO 0.77 LOR-83C-0.00 TO 0.15 LOR-83C-0.33 TO 0.75 - Urbanized Area Inside of City 100% Local 92888~|~1~|~2~|~02/S>2~|~LOR-10C-0.00 TO 0.20 LOR-10C-0.71 TO 0.77 LOR-83C-0.00 TO 0.15 LOR-83C-0.33 TO 0.75 - Urbanized Area Inside of City Fed/Loc 92888~|~1~|~4~|~04/NHS~|~NHS inside of City.LOR-10-6.53 TO 6.77 Fed/Loc. 92888~|~1~|~5~|~05/NHS~|~NHS inside of City.LOR-10-6.53 TO 6.77 100% Local. 109304~|~1~|~1~|~01/SAF~|~Guardrail replacement on various County Routes 100% Safety funding (4HB7). 114418~|~1~|~1~|~01/STR~|~Resurfacing SR 149 107440~|~1~|~1~|~01/SAE~|~Signal upgrades on various routes throughout District 4. 94266~|~1~|~1~|~01/NHS~|~FY2016 Urban Paving Project in the City of Cincinnati on portions of US 50, US 52, and SR 264. This split is for pay items split 80% State and 20% City. 94266~|~1~|~2~|~02/NHS~|~FY2016 Urban Paving Project in the City of Cincinnati on portions of US 50, US 52, and SR 264. This split is for pay items at 100% City. 107564~|~1~|~1~|~01/NHS~|~Resurfacing BEL-7 107564~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings delta costs (safety funds). 107564~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 90231~|~1~|~2~|~02/S<2/JEF~|~Mill and resurface with asphalt concrete CR 22A from US 22 EB off ramp to Wintersville West Corp; includes guardrail replacement, shoulder treatment, pavement markings and curb ramps. Non-NHS portion. 90231~|~1~|~1~|~01/NHS/JEF~|~Mill and resurface with asphalt concrete CR 22A from US 22 EB off ramp to Wintersville West Corp; includes guardrail replacement, shoulder treatment, pavement markings and curb ramps. NHS portion. 115576~|~1~|~1~|~01/STR~|~Asphalt resurfacing project on ATH CR 15 3.18-4.49, CR 16 0.00-3.58, CR 20 1.86-4.56, CR 33 0.00-1.84, CR 42 0.00-8.79. Rural other federal aid funded 80 Federal/20 Local. 115576~|~1~|~2~|~02/S<2~|~Asphalt resurfacing project on CR 20 1.43-1.86, CR 21 5.85-5.98, CR 25 7.61-8.03. Urban other federal aid funded 80 Federal/20 Local. 115576~|~1~|~3~|~03/NFA~|~Asphalt resurfacing project on ATH CR 1 0.00-1.79, CR 21 4.32-5.85 and CR 25 5.75-7.61. Minor collector funded 80 federal/20 local. 90141~|~1~|~1~|~01/STR~|~8603219 WIL SR576 17.72 Intersect: W Br St Joseph River 112879~|~1~|~2~|~02/STR~|~STP Rural Plan Split 112879~|~1~|~1~|~01/S>2~|~STP>200,000 Plan Split 102371~|~1~|~1~|~01/NHS~|~Double Microsurfacing 97588~|~1~|~1~|~01/STR~|~ROS US 50 Slide Repair 97588~|~1~|~2~|~02/STR~|~Change Order for emergency repair cost due to a flood event. 97423~|~1~|~1~|~01/STR~|~Replace five culverts, of which, three are in a rural area. BEL-149-11.32, BEL-149-13.99 and BEL-800-12.63 97423~|~1~|~2~|~02/S<2~|~Replace five culverts, of which, two are in an Urban Area. BEL-40-24.76 and BEL-147-35.04 109435~|~1~|~1~|~01/STR~|~All resurfacing work on SR 117 in the project. Resurfacing of the realignments with township roads is covered in Plan Split 3. Federal and State funds from the District Preservation Program budget. 109435~|~1~|~2~|~02/ENH~|~All lighting, curb and gutter, and sidewalk. Includes the drainage and miscellaneous work related to the pedestrian facilities and curb and gutter. Work funded by TAP and focused on transportation alternatives through the corridor. 109435~|~1~|~3~|~03/SAF~|~Realignment and reconstruction of intersecting roadways including drainage work along Brentlinger Road. Includes widening of SR 117 for the addition of a left turn lane at Brentlinger Road. Also includes the reconstruction of a portion of SR 117. This work is aimed at increasing safety in and around all intersecting roadways. 106354~|~1~|~1~|~01/STR~|~Culvert Replacement 81510~|~1~|~2~|~02/IMS~|~New alignment of Mt. Everett Road underneath TRU-IR 80-8.56 L&R Structures. 81510~|~1~|~1~|~01/BRO~|~Replacement of sfn#7804172 and sfn#7804148 over Mount Everett Road...initial funding from Eastgate, balance from District Preservation... 79385~|~1~|~1~|~01/S<2/FRAN~|~FY2015 Urban Paving in the City of Franklin. This Plan Split is for the Middletown Urbanized area between SLM 28.36-29.43. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. 79385~|~1~|~2~|~02/S<2/FRAN~|~FY2015 Urban Paving in the City of Franklin. This Plan Split is for the Middletown Urbanized area between SLM 28.36-29.43. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps. 102065~|~1~|~1~|~01/NFA~|~Resurfacing of Memorial Hill Drive in Mill Creek Park. 107376~|~1~|~1~|~01/IMS~|~Major rehab of IR 75 SLM 14.66 to 17.16 107376~|~1~|~2~|~02/IMS~|~Resurface pavement to improve friction. 107376~|~1~|~3~|~03/IMS~|~Varying degrees of bridge work, deck patching, widen approach slabs, etc. 107376~|~1~|~4~|~04/BRO~|~Temporary repairs to structural steel to address damage from bridge strike 107341~|~1~|~1~|~01/NFA~|~D09 PM FY2024 (A) 111351~|~1~|~1~|~01/NFP~|~Resurfacing to include R11, Parking at end of R3, RtID: 10, 80, 156, 157 in East Fork State Park 115734~|~1~|~1~|~01/SAF~|~2025/2026 Traffic Signal Maintenance 115734~|~1~|~2~|~02/NHS~|~US 33 Signals 97012~|~1~|~1~|~01/STR~|~from 0.00 to 2.41 97012~|~1~|~2~|~02/BRO~|~Replacement of SFN 8706905 & 8706875 90195~|~1~|~1~|~01/IMS~|~District Allocation 98775~|~1~|~1~|~01/ENH~|~Abovedeck interior restoration of historic steam powered sternwheel tow boat. Owned by Ohio Historical Society. Funded 80 federal/20 local. 100861~|~1~|~1~|~01/STR~|~JAC 140 0.00-2.46JAC 776 2.87-9.28 100861~|~1~|~2~|~02/S<2~|~JAC 776 9.28-11.44 122052~|~1~|~1~|~01/IMS~|~Plan split represents all work related to roadway construction. 122052~|~1~|~2~|~02/IMS~|~Plan split represents all work related to bridge construction. 122052~|~1~|~3~|~03/IMS~|~This plan split represents roadway work associated with Part 2 of the project (PID 124089), which includes mainline I-71 from Findlay to WHV. 122052~|~1~|~4~|~04/IMS~|~This plan split represents the bridge work in Part 2 (PID 124089) and includes the Harrison and Bank Street mainline structures. 90466~|~1~|~1~|~01/NFA~|~Deck replacement and repair steel beam and backwalls on WAS 260 0969 (SFN 8403902). Not on any federal aid system funded 100% state. 115758~|~1~|~1~|~01/NHS~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on WAR-73 115758~|~1~|~2~|~02/NHS/SPB~|~Plan split for the 100% City items on the urban paving on WAR-73 104049~|~1~|~1~|~01/SAE~|~Pavement marking on various routes using 100% federal 4HB7 funds. 124118~|~1~|~1~|~01/STR~|~VIN SR 327 at the 1.19 Bridge Replacement (SFN 8202109) 101261~|~1~|~2~|~02/S<2~|~Bridge Work 101261~|~1~|~3~|~03/S<2~|~100% city of Orrville items. 101261~|~1~|~1~|~01/S<2~|~Urban Paving - 80/20 Dist/City 101261~|~1~|~4~|~04/S<2~|~Urban Paving 50/50 Dist/Local 99948~|~1~|~1~|~01/SAF~|~Installing traffic signal on Perry Drive at Jackson Avenue intersection. Includes adding westbound left turn lane on Perry Drive and northbound left and right turn lanes on Jackson Ave. Includes lighting and guardrail work. 117190~|~1~|~1~|~01/SAF~|~Plan Split for all safety-eligible items. 101409~|~1~|~4~|~04/S<2~|~City of Bucyrus - Split Corp CRA-19-16.08 to 16.37 101409~|~1~|~3~|~03/STR~|~Bridge work on Structures:CRA-19-20.63CRA-19-21.54 101409~|~1~|~1~|~01/STR~|~STP Rural AC Overlay with RepairCRA-19-16.37 to 23.26 101409~|~1~|~2~|~02/S<2~|~S<2 Overlay with RepairsCRA-1916.08 to 16.37 (Split Corp) 101409~|~1~|~5~|~05/S<2~|~100% City of BucyrusCRA-19-16.08 to 16.37 (Split Corp) 102191~|~1~|~1~|~01/NHS~|~not sure 93398~|~1~|~1~|~01/STR~|~Field pave invert of steel culverts with concrete. SFN 1100947 CHP 36 2157 Tributary to Buck Creek SFN 1101013 CHP 36 2327 Tributary to Treacle Creek. 93398~|~1~|~2~|~02/STR~|~Field pave invert of steel culverts with concrete on SFN 1102990 CHP 559 0895 on Branch of Darby Creek. 84823~|~1~|~1~|~01/BRF~|~Remove existing steel superstructure, widen existing abutments and place rock channel protection in front of the abutments, place a prestressed, reinforced, non-composite concrete box beam deck superstructure, complete all roadway approach work necessary for proper roadway geometrics on Winkler Road in Mercer County. SFN 5430518 MER CR 250 0250 115243~|~1~|~1~|~01/SAF/TUS~|~Pavement marking on various county routes with 100% CEAO Safety funding (4HB7). 120086~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 111511~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract throughout the District 114835~|~1~|~1~|~01/NHS~|~NHS Plan split for PIC-23-12.89-16.94 repair and resurfacing. 114835~|~2~|~2~|~02/NHS~|~Construct northbound left turn lane and crossover at the future rest area entrance. 114835~|~3~|~3~|~03/STR~|~Plan split for roundabout at 762/Duvall Road - created for ODOT TID funding. 94212~|~1~|~1~|~01/STR~|~This plan split includes rehabilitate of bridge PRE-122-0155 over Fourmile Creek and all associated roadway / guardrial work. 90413~|~1~|~1~|~01/BRF~|~Project includes replacing structurally deficient Bridge No. PRE-CR 80-0010 (SFN: 6835643) which carries Barnets Mill Road (CR-80) over Seven Mile Creek. Work includes minor approach work, pavement repairs, and vertical alignment adjustments, as necessary. 119430~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs ASD-95-6.49 to 13.499, ASD-511-18.329 to 22.980 92452~|~1~|~1~|~01/SAF/FIND~|~This split is for work eligible for funding from the central office controlled safety program. ODOT Safety Program Manager Michelle May approved $406,800 in safety funds for construction in an October 27, 2011 IOC. The City of Findlay is responsible for a 10% local match. The City of Findlay is also responsible for the additional funds if more than the capped amount is needed. 97503~|~1~|~1~|~01/BRO~|~Plan split to program project. Update after scope of work is complete. 106004~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 50 16.65. DSR ATH-003. NHS route funded 80 federal/20 state. ER funds. 93374~|~1~|~2~|~02/NHS~|~Priority system paving of FRA-161: 13.97-15.06 93374~|~1~|~1~|~01/NHS~|~Columbus urban paving of FRA-161: 10.58-13.97 84240~|~1~|~2~|~02/MPO~|~Locals responsible for funding over the maxed cap in CO CC 1 for widening on Austin Pike from two to five lanes along with the widening of a bridge in the project area and a recreational trail being constructed on one side of Austin Pike. A new traffic signal and lighting will also be added. 84240~|~1~|~1~|~01/MPO~|~Widening of Austin Pike from two to five lanes, widen bridge in the project area, construct a recreational trail on one side of Austing pide and add a traffic signal and lighting. Project cap = $1,500,000 Federal max. 108780~|~1~|~1~|~01/STR~|~Plan Split 82291~|~1~|~2~|~02/NHS~|~Four-lane resurfacing project using a mill and fill treatment in the City of Athens. ATH 50 9.18-11.56 Funded 80 federal/20 local. 82291~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using a mill and fill treatment. ATH 50 1.74-4.99, 9.18-11.56 and ATH 32 0.00-1.42. NHS Federal/State 80/20%. 116823~|~1~|~1~|~01/NHS~|~Resurfacing. 110429~|~1~|~1~|~01/ENH~|~Construct new pedestrian tunnel under Fulton Ave. 110429~|~1~|~2~|~02/ENH~|~Construction of pedestrian path, retaining walls and security lighting. 110429~|~1~|~3~|~03/ENH~|~Sewer relocation. 76408~|~1~|~1~|~01/NHS~|~not BR Eligible: SFN 7801688 3.89 SR11 under liberty St. CR352. 76408~|~3~|~3~|~03/BRO~|~BR Eligible: SFN 7801777 7.05 SR11 Under Anderson-Morris Rd. 76408~|~2~|~2~|~02/BRO~|~BR Eligible: SFN 7801718 6.22 SR11 Under Tibbets-Wick Rd CR28. 76408~|~4~|~4~|~04/BRO~|~BR Eligible: SFN 7806639 1.29 SR304 over SR11 4.52. 87369~|~1~|~1~|~01/BRO~|~Replace bridge substructure on SFN 0602434 AUG 75 12.34 on Interstate 75 under CR 208, National Road. 111012~|~1~|~1~|~01/SAF~|~Signal upgrades along SUM SR 261 at Dart Ave and Rand Ave. 111012~|~1~|~2~|~02/S>2~|~Resurfacing of SUM SR 261 from 8.11 to 8.42 in the City of Akron. 111012~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span. 97848~|~1~|~1~|~01/BRO~|~OBPP replacement of CO SFN 4133021 107798~|~1~|~1~|~01/IMS~|~Construction of Type II noise barrier along IR-480 at 90% federal/ 10% state participation 89474~|~2~|~2~|~02/S<2~|~"02/S<2/PV/TUS" - URBAN resurfacing of CR 80 from SR 516 to IR 77. 89474~|~1~|~1~|~01/STR~|~"01/STR/PV/TUS" - RURAL resurfacing of CR 80 from SR 516 to IR 77. 93868~|~1~|~1~|~01/NFP~|~ODNR Microsurfacing 99788~|~1~|~1~|~01/BRO~|~Split for work on LAK-271-0145 SW: 4305523 99788~|~1~|~2~|~02/IMS~|~Split for work on LAK-271-0127 SW: 4305469 117951~|~1~|~1~|~01/SAF~|~Reduce the negative offset of the left-turn lanes by removing the center medians near the intersection of Bethel Road and Dierker Road. 103422~|~1~|~1~|~01/NHS~|~2.5" Mill and fill in the City of Kettering - UPP. 103422~|~2~|~2~|~02/NHS~|~100% local funds to pay for man-hole castings 113318~|~1~|~1~|~01/NFP~|~Replacement of CFN# 1847142 along State Route 82 in Trumbull County, Ohio. 115376~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4. 120353~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. 115361~|~1~|~1~|~01/SAF/NLEX~|~01/SAF/OT/NLEX - 100% Federal (80% 4SC7 and 20% TRC) - installation of shared use pathway along Panther Drive. 118762~|~1~|~1~|~01/NFP~|~Cleaning and sealing bridge decks throughout D11. 91962~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of BEL-800-0.00 to 9.78 and 10.21 to 25.04; includes pavement repairs, pavement marking 112872~|~1~|~1~|~01/S>2~|~Urban Area Plan Split 112872~|~1~|~2~|~02/NHS~|~NHS Plan split 104757~|~1~|~1~|~01/NFP~|~Spot Paving various routes in POR, STA and SUM Counties. 104757~|~1~|~2~|~02/NFP~|~See linked structures > 20' span. 81338~|~1~|~1~|~01/SAF/WADS~|~Pavement reconstruction and widening. 81338~|~1~|~2~|~02/SAF~|~100% local items. 91733~|~1~|~1~|~01/NHS~|~ Minor rehab on US 27 in Butler County from the Hamilton County to SR 129 91733~|~1~|~2~|~02/S<2~|~Plan split for work on the tin section of SR 129 at the intersection in Millville 106647~|~1~|~1~|~01/ENH~|~Construct a bikeway to connect the Hockhocking Adena Bikeway with the Village of Chauncey. Funded 95% federal/5% local. 123983~|~1~|~1~|~01/STR~|~Culvert replacement. MOE 556 0.54, CFN 1802911. 119782~|~1~|~1~|~01/STR~|~added plan split. 113063~|~1~|~1~|~01/IMS~|~All work in this plan split. 78572~|~1~|~1~|~01/NHS~|~Fill in the gypsum mines under SR-2 in Ottawa County. 110554~|~1~|~1~|~01/IMS~|~Repair the bridge size culvert at I-275 over Hall Run. Rehab shall reconstruct trash Rack, remove Debris, control erosion and drainage issues, patch concrete, and repair scour . Drainage, erosion, shallow slides, access road, gate and fence. 93925~|~1~|~1~|~01/S>2~|~SR-2 from SLM 15.27 to SLM 17.82, all pavement work from face of curb to face of curb and to a depth of 3.5". 93925~|~1~|~2~|~02/NFP~|~SR-2 from SLM 15.27 to SLM 17.82, all work outside area from Face of curb to Face of Curb and full depth repairs. 108406~|~1~|~1~|~01/STR~|~DSR HOL-001 from OH18-01 ER event. 108406~|~1~|~2~|~02/STR~|~DSR HOL-002 from OH18-01 ER event. 117546~|~1~|~1~|~01/NFP~|~All items of work associated with DDMS signs and CCTV cameras 117546~|~1~|~2~|~02/NFP~|~Installation of traffic monitoring cameras along IR 70 in MUS 105106~|~1~|~3~|~03/S>2~|~Chip seal on:WAR-123 SLM 7.20 to 7.72 105106~|~1~|~2~|~02/NFA~|~Chip seal on:CLE-727 SLM 2.49 to 3.79 105106~|~1~|~1~|~01/STR~|~Chip Seal on:CLE-133 SLM 31.16 to 34.57CLE-133 SLM 34.57 to 37.37CLE-727 SLM 3.79 to 5.46WAR-123 SLM 0.06 to 7.20WAR-132 SLM 0.00 to 3.03WAR-132 SLM 3.57 to 5.06 83261~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 180 0403, SFN 3702820. Rural other ferderal aid funded 80 federal/20 state. 108746~|~1~|~1~|~01/NFP~|~D09 Deck Sealing Project FY2025 117104~|~1~|~1~|~01/ENH~|~All work being completed in this project is in this split. 95% federal funds with Toll Revenue Credit from the Transportation Alternatives Program (TAP). The local match and funds needed over the TAP cap to be provided by the Village of Antwerp. 96183~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using the District Preservation Program SACs 4PF7 and 4PS7. 123421~|~1~|~1~|~01/NFA~|~Resurfacing SR 646 97380~|~1~|~1~|~01/S<2~|~Mill and fill existing pavement beginning at Vandemark Road and ending at the I-75 overhead structure. Pavement planing and resurfacing with asphalt concrete SR 47 fomr Fourth Street (SLM 14.51) to Ohio Avenue (SLM 15.46). 97380~|~1~|~2~|~02/IMS~|~Paving on Interstate Ramp on IR 75 in connection with local project. 85073~|~1~|~2~|~02/S>2~|~100% State funds for eligible work in the Village of North Randall in the split corp section from SLM 9.12 to 9.20. 85073~|~1~|~1~|~01/S>2~|~85/15 state/local funding split for work from SLM 9.12 to 10.61 that is eligible for urban paving funds within the City of Warrensville Hts. 85073~|~1~|~3~|~03/S>2~|~100% local participation for work items especially ADA compliant curb ramps. 120345~|~1~|~1~|~01/S5K~|~Implement safety countermeasures. 99849~|~1~|~1~|~01/MPO~|~Resurfacing Whipple Avenue. 92966~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge replacement 108060~|~1~|~1~|~01/NHS~|~Replacement of the linked structure > 20' span. 100518~|~1~|~1~|~01/STR~|~BRO 62 26.98 101709~|~1~|~1~|~01/NFP~|~Statewide traffic signal upgrade contract 115762~|~1~|~1~|~01/NFA~|~Asphalt resurfacing project on Florence Street in City of Belpre. WAS MR00041 0.04-0.87 (Florence Street). 100% C227 funds. 115762~|~1~|~2~|~02/S<2~|~Asphalt resurfacing project on Belrock, Poplar and Braun Streets in City of Belpre. WAS CR00002 0.00-0.62 (Belrock, Poplar, Braun Street). 100% C227 funds. 102419~|~1~|~1~|~01/S>2~|~MAH SR 164 from 5.71 to 7.43 102419~|~1~|~2~|~02/STR~|~MAH SR 164 from 3.59 to 4.85 and 5.22 to 5.71 MAH SR 165 from 16.64 to 21.80 118008~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at WAY-94-18.21/SR-585/SR-604 (Safety Funds) 119080~|~1~|~1~|~01/STR~|~Plan split for work in rural location. 119080~|~1~|~2~|~02/S>2~|~Plan split for work in large urban location. 123855~|~1~|~1~|~01/BRF~|~Plan split for bridge work using municipal bridge funding for rehabilitation of an off-system bridge at 100% Federal funds 100918~|~1~|~1~|~01/S<2~|~Overlay with asphalt concrete various routes in Auglaize County: AUG SR 66 SLM 0.00 to 2.02 AUG SR 119 SLM 5.17 to 5.81 100918~|~1~|~2~|~02/NHS~|~Overlay with asphalt concrete US33 in Auglaize County: AUG US 33 SLM 27.64 to 29.20 100918~|~1~|~3~|~03/STR~|~Overlay with asphalt concrete SR29 in Auglaize County: AUG SR 29 SLM 9.67 to 10.95 112127~|~1~|~1~|~01/SAF~|~Safety funded items plan split 112127~|~2~|~2~|~02/NFP~|~Plan Split for 100% local items added to the project, including relocation of the curb line 116200~|~1~|~1~|~01/BRF~|~Complete bridge replacement utilizing 4R87 Federal funds at 100% up to maximum. 114416~|~1~|~1~|~01/SAF/BHJ~|~Intersection improvement project funded at a maximum of $500,000, using 100% (4SH7) Local Roads Oil and Gas Shale Program. 116276~|~1~|~1~|~01/NFA~|~Resurfacing SR 646 87855~|~1~|~1~|~01/NFP~|~Funding split for construction using bond funding. 111251~|~1~|~1~|~01/ENH/ASMP~|~Construct multi-use trail from Maple Ave Trailhead to Leon Rd (Phase 1.1) and between Main St to just south of Marvin Rd (Phase 1.2). 111251~|~1~|~2~|~02/ENH~|~trail 25795~|~1~|~2~|~02/IMS~|~80/20 fed/state funding split for added capacity 25795~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for replacement of existing pavement. 102170~|~1~|~1~|~01/NFA~|~The City is constructing SR741 road improvements to support a new Masters harmaceutical headqtr and distribution. Adding a northbound left turn lane and southbound right turn/deceleration lane and related intersection improvements to align with Weldon Dr. 104853~|~1~|~1~|~01/NFA~|~The DCED will assist the Hornish Group in constructing a new access to SR 281 approximately 500 feet north or SR 18 and closing an existing access point on SR 18 approximately 500' east of SR 281 107418~|~1~|~1~|~01/IMS~|~Split for median barrier replacement 23104~|~1~|~1~|~01/STR~|~Railroad Grade Separation project in the Village of Wellington.90% TRAC / 5% Railroad / 5% Wellington 23104~|~1~|~2~|~02/STR~|~TRAC Funded (4BK7/4BD7) On going services and "as Built" plan development 96402~|~1~|~1~|~01/NFP~|~New Ross County ODOT Garage 116832~|~1~|~1~|~01/S>2~|~Resurfacing 89173~|~1~|~1~|~01/BRO~|~Bridge replacement project. GAL 160 2.45, SFN 2702045. BR eligible funded 80 federal/20 state. 89173~|~1~|~2~|~02/S<2~|~Resurfacing GAL 160A 0.00-0.74 using an asphalt overlay treatment. Urban other federal aid funded 80 federal/20 state. 97755~|~1~|~1~|~01/NFP~|~Removal of underground storage tanks at the Madison County Garage 114590~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 681 4.78. Work includes dig out and replace. 120465~|~1~|~1~|~01/NHS~|~added plan split. 110472~|~1~|~1~|~01/SAE~|~Project to improve the safety and operation of the intersection of SR 47 and SR 235 114868~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. Funded 80 Federal/20 State. 114868~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. Funded 100% State. 114868~|~1~|~3~|~03/NFP~|~ODNR project to resurface roads in Burr Oak State Park. Funded 100% State. 123229~|~1~|~1~|~01/STR~|~450ft. landslide repair on SR 78 24.58 - 24.61mm. 88721~|~1~|~2~|~02/SAF~|~MOT SR 48 19.10 at the Clayton corporation limit - have to curb ramps install/updated to current standards and to have a uniform installation of the curb ramps. 88721~|~1~|~1~|~01/SAE~|~Signal system upgrade on MOT State Route 48 (SLM 16.21) from Waverly/Wampler to Westbrook/Dog Leg (SLM 19.10). 107347~|~1~|~2~|~02/SAF~|~TSMO funds for traffic camera installation at NOB 77 11.20 (Belle Valley), WAS 77 16.41 (Macksburg) and WAS 77 6.12 (Lower Salem). 107347~|~1~|~1~|~01/IMS~|~Lighting project in D10 for FY2024 on Interstate Routes. Funded 80 federal/20 state. 107347~|~1~|~3~|~03/STR~|~Lighting project in D10 on rural routes. Funded 80 Federal/20 State. 101581~|~1~|~1~|~01/S<2~|~DSR# JEF_016 86170~|~1~|~1~|~01/ENH/BEL~|~"01/ENH/BR/BEL" - CR40B ~0.5 mi E of Lloydsville over Wheeling creek and TR814 ~0.5 mi E of Morristown over Barkcamp Creek; reconstruct 2 historic stone arch bridges on the old National Road. The project is funded through Transportation Enhancement program. Toll Revenue Credit capped at $118,597, with the remainder of TE funding at 80% TE/ 20% Local participation. 78278~|~1~|~1~|~01/NHS~|~Reconstruction and realignment of POR-SR14, from SLM 12.40 to SLM 12.90, and POR-SR59 from SLM 9.04 to SLM 10.03 in Ravenna Township, Portage County, Ohio. 79977~|~1~|~1~|~01/STR/Stat~|~It is proposed to construct a new 4-lane, limited access highway to bypass Portsmouth, Ohio. Phase 2 begins @ CR 28 (Lucasville-Minford Road) and ends at US 23 at Lucasville. Phase 1 is 19415, Phase 2 is 79977, & Phase 3 is 77366. 114328~|~1~|~1~|~01/SAF~|~Signal upgrades. 96574~|~1~|~1~|~01/NFA~|~Funding for the maintenance facility construction 113087~|~1~|~1~|~01/NFP~|~CE Inspection 113087~|~1~|~2~|~02/NFP~|~CE EINSP Plan split. 113087~|~1~|~3~|~03/NFP~|~CE INSP FY28 plan split. 98990~|~1~|~1~|~01/STR~|~Replace the exisiting bridge deck with a 8.5" composite concrete deck and widen the existing walks, replace the expansion joints and bearings on SFN 7530757 - SHE CR 8 5.01 95197~|~1~|~2~|~02/NFA/GCEO~|~"01/STR/PV/GCEO" Guernsey County Engineer CEAO Minor Collector Route -CEAO federal max at 80% 2,496,480 95197~|~3~|~3~|~03/S<2/GCEO~|~"01/S<2/PV/GCEO" Guernsey County Engineer CEAO Urban Minor Collector - CEAO federal Max $2,496,480. 95197~|~1~|~1~|~01/STR/GCEO~|~"01/STR/PV/GCEO" Guernsey County Engineer (Rural Major Collector) CEAO funded project with a maximum dollar at (80%) of $2,496,380 96787~|~1~|~1~|~01/S<2~|~General System resurfacing including pavement repairs and shoulder rehab on COL-164-21.54 to 24.31. 96787~|~1~|~2~|~02/NFA~|~Gewneral System Resurfacing including pavement repairs and shoulder rehab on COL-164-18.00 to 21.54. 108279~|~1~|~1~|~01/STR~|~Emer. Plan Split 110848~|~1~|~1~|~01/NFA~|~Replacement of structure > 20' span. 87708~|~1~|~1~|~01/IMS~|~Resurfacing 94397~|~1~|~1~|~01/STR~|~2 Lane Resurfacing 94397~|~1~|~2~|~02/STR~|~Bridge Work: LOR-301-0.15, LOR-301-1.64, LOR-301-9.19, LOR-301-10.97 109580~|~1~|~1~|~01/STR~|~Chip sealing 109580~|~1~|~2~|~02/S<2~|~Chip sealing 122487~|~1~|~1~|~01/S50~|~Roadway rehabilitation and associated improvements utilizing State Oil & Shale funds at 100% up to Program maximum. 112987~|~1~|~1~|~01/IMS~|~Culvert repair. 112987~|~1~|~2~|~02/NHS~|~Culvert repair. 93923~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2016. Various routes and sections in D10. Funded 100% state. 123852~|~1~|~1~|~01/SAF~|~100% HSIP funding ($300,000.00 cap) 118064~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funded scope. 96819~|~1~|~1~|~01/NHS~|~Priority System resurfacing of COL-30 from SLM 28.03 to SLM 31.31 including joint repairs and pavement markings. 114726~|~1~|~1~|~01/SAF~|~District-wide polyester pavement markers. 122399~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. 94672~|~1~|~1~|~01/STR~|~Replace culverts SFN 1201816 CLA 41 2675 (East Fork of Donnels Creek) & SFN 1201948 CLA 41 2918 (over Jackson Creek) deteriorated concrete box culverts, SFN 1201840 CLA 41 2693 (East Fork of Donnels Creek)twin corregated metal culverts. 81636~|~1~|~2~|~02/IMS~|~not BR Eligible: SFN 6702376 9.76 IR76 over new milford CR31. SFN 6702430 9.91 IR76 over norfolk southern RR. SFN 6702554 10.09 IR76 over hattrick rd CR110. SFN 6702589 11.13 under industry rd CR47. SFN 6702619 and SFN 6702627 IR76 11.25 L/R over barrell run. SFN 6702643 and SFN 6702708 WB/EB IR76 13.04 over SR14 17.46. 81636~|~1~|~1~|~01/IMS~|~Resurfacing IR76 9.72-13.55 98058~|~1~|~1~|~01/STR~|~Added for slide emergency A project 110716~|~1~|~1~|~01/STR~|~Rebuild shoulders on SR 18 in Defiance County from the Defiance Urban Area boundary at Kepler Road at 28.93 to Harris Road at 31.06. Major rehab funds. 110716~|~1~|~2~|~02/NFA~|~Rebuild shoulders on SR 18 in Defiance County from Harris Road at 31.06 to the end of the project at the Henry County Line at 33.30. Major rehab funds. No federal funds. 118868~|~1~|~1~|~01/S5K~|~SR 416 from SLM 12.98 to SLM 14.85 118868~|~1~|~2~|~02/STR~|~Resurfacing SR 416 from SLM 14.85 to SLM 14.99 111394~|~1~|~1~|~01/IMS~|~Bridge Plan split 105307~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridge. 123198~|~1~|~1~|~01/NHS~|~Replace bridge deck 117902~|~1~|~1~|~01/IMS~|~Phase 1 NEVI I70B 12500~|~1~|~1~|~01/MPO~|~80/20 fed/local plan split for all work using federal MPO STP funds. 123803~|~1~|~1~|~01/STR~|~stp rural 123803~|~1~|~2~|~02/S5K~|~stp 97901~|~1~|~1~|~01/NFP~|~Resurface parking lots at District Headquarters 102783~|~1~|~1~|~01/NHS~|~This plan split is for work on NHS bridge. 119846~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Sullivant Ave 106018~|~1~|~1~|~01/NHS~|~Concrete deck overlay project. GAL 35 1743 L (SFN 2701413), GAL 35 1768 (SFN 2701448). NHS route funded 80 federal/20 state. 116193~|~1~|~1~|~01/NFP~|~Construction Inspection 95600~|~1~|~1~|~01/IMS~|~Priority System minor rehabilation of existing IR 70 pavement: including joint repair, asphalt resurfacing, replace median barrier, replace guardrail, replace lighting. 95600~|~1~|~2~|~02/IMS~|~Bridge repair by cleaning and painting steel beam bridges using system OZEU and for BEL-70-2000, SFN 072722, by replacing bearings, repairing expansion joints and repairing substructure. 95600~|~1~|~3~|~03/IMS~|~Slide repair. ER Event OH15-01. DSR# BEL-013. 113552~|~1~|~1~|~01/NFA~|~Created for J&C involvement, 111283~|~1~|~1~|~01/SAF~|~Adding through/ turn lanes and making signal improvements 111283~|~1~|~2~|~02/NHS~|~100% Local Items 124791~|~1~|~1~|~01/S50~|~First Street paving and bike path from Meigs Street to Cedar Point Drive. 102421~|~1~|~1~|~01/NHS~|~Construct superstreets at the US-35 intersections with Factory and Orchard. 102421~|~1~|~2~|~02/NHS~|~Bridge to be widened for Design-Build Superstreets project. Substantial improvements to the existing condition are not expected. 102421~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 117915~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-B BUT 29-51 117915~|~1~|~2~|~02/IMS~|~NEVI Phase 1 I-75-E 113692~|~1~|~1~|~01/SAF~|~Install a westbound left turn lane at the intersection of US 33 and Townline-Kossuth Road including offset and full deceleration. Also install short, storage only left turn lane for eastbound approach. 107945~|~1~|~1~|~01/SAF~|~Pavement marking plan split 103834~|~1~|~1~|~01/MPO~|~Construct Hike and Bike Trail in the City of Kent. 75619~|~1~|~1~|~01/NHS~|~Remove structure(s) over abandon RR. HOC 33 11.07 L & R. SFN 3700607 (L) and SFN 3700631 (R). 75619~|~1~|~2~|~02/NHS~|~Remove structure(s) over abandon RR and replace with fill and new pavement on HOC 33 11.03-11.14 WB and HOC 33 11.06-11.17 EB. NHS route funded 80 federal/20 state. 114228~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order. 100009~|~1~|~1~|~01/STR~|~Bridge Replacement HIG 62 18.18 (SFN 3601293) 93205~|~1~|~1~|~01/STR~|~Remove and replace existing deck overlay and refurbish bearings and repair top of backwalls on SFN 5504627 MIA 718 0257 over Stillwater River. 121491~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance. 121491~|~1~|~2~|~02/S>2~|~Bridge preventive maintenance. 110673~|~1~|~2~|~02/STR~|~Resurfacing. 110673~|~1~|~1~|~01/S5K~|~Resurfacing. 110673~|~1~|~3~|~03/STR~|~Bridge preventive maintenance. 101667~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/PV/CAMB" City of Cambridge approved Small City funding with a federal max of $3,547.025.69 at 95% funding for the reconstruction of Clark Street. 97977~|~1~|~1~|~01/STR~|~D09 GR FY20 117979~|~1~|~1~|~01/BRF~|~Bridge replacement 114295~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8. 96116~|~1~|~1~|~01/NFP~|~Material Storage Shed 91548~|~1~|~1~|~01/IMS~|~The project involves the replacement of the deck on Bridge BEL-70-0865 (SFN 0702196). The structural steel is to be painted or replaced and the bridge will be raised without impacting the profile to any great extent. 110573~|~1~|~1~|~01/STR~|~Culvert repair throughout the district. 84079~|~1~|~1~|~01/NFA~|~Resurface SAN SR523 0-3.79 84079~|~1~|~2~|~02/NFA~|~Relocate ditch away from edge of pavement. 88300~|~1~|~1~|~01/SAE~|~Shared use path along Feedwire Road, signal upgrade at Upper Bellbrook/Feedwire intersection, crosswalk improvements at the Middle School drive. 119145~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on ATH 681 0.00-7.24 and ATH 124 0.90-4.49. 107261~|~1~|~1~|~01/MPO~|~Resurfacing Medina County Line Road between Eastern Road and Greenwich road in the City of Norton. 124819~|~1~|~1~|~01/IMS~|~Construct noise wall on north side of IR 70 112785~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 112785~|~1~|~1~|~01/NHS~|~Resurfacing. 88405~|~1~|~1~|~01/STR/FCEO~|~"01/STR/OT/FCEO" - Safety Program Funding 4RS7 (90% Federal) / LNTP (10% Local Match) - No CAP - Fairfield County Safety Project to relocate a portion of CR71. 106450~|~1~|~1~|~01/NFA~|~The City will construct improvements to Pershing Ave from the Southern Ohio Veterans Memorial Highway project limits for an estimated 968 linear feet to the Rocla Ties entrance, widen to 21 linear feet 91343~|~1~|~1~|~01/STR~|~General system resurfacing of SR-361 from US-23 to SR-159 116920~|~1~|~1~|~01/STR~|~Bridge overlay w/waterproofing 122428~|~1~|~1~|~01/ERD~|~Plan Split for RAISE eligible Scope 119237~|~1~|~1~|~01/NFA~|~ATH-TR315-0.01 Bridge Replacement (SFN: 0540919) 84559~|~1~|~1~|~01/BRF~|~Elegible bridge SFN 0432962 Johnson Road Bridge over the Grand River 96188~|~1~|~1~|~01/NFP~|~Construct a cold storage building in the Riveredge Garage in Cuyahoga county. 23733~|~1~|~1~|~01/SAE~|~100% State Amish Buggy Safety funding 121523~|~1~|~1~|~01/SAF~|~Polyester Pavement Markers 97898~|~1~|~1~|~01/S>2~|~CR 192 (OC 759) - construction of a roundabout at the intersection of Garbry Road and Looney Road. 76466~|~1~|~2~|~02/S<2~|~STP D6 funding for US-36 resurfacing 76466~|~1~|~1~|~01/NHS~|~NHS D6 funding for US-33 roadway work 76466~|~1~|~3~|~03/NHS~|~NHS D6 funding for 17 bridges on US-338000786 UNI US33 8.79 Intersect: Over Nw Parkway (C-133)8000816 UNI US33 8.79 Intersect: Over Nw Parkway (C-133)8000840 UNI US33 9.05 Intersect: Over Csx Rr8000875 UNI US33 9.05 Intersect: Over Csx Rr8000905 UNI US33 9.12 Intersect: Over Cr 1918000964 UNI US33 9.12 Intersect: Over Cr 1918000999 UNI US33 9.22 Intersect: Mill Cr8001022 UNI US33 9.22 Intersect: Mill Cr8001057 UNI CR114 11.5 Intersect: Over Cr 1148001081 UNI CR114 11.5 Intersect: Over Cr 1148001111 UNI US33 11.56 Intersect: Mill Creek8001146 UNI US33 11.56 Intersect: Mill Creek8001170 UNI US33 12.19 Intersect: Over Us368001200 UNI US33 12.19 Intersect: Over Us368001219 UNI US33 8.34 Intersect: US-35/4 Ramp8001227 UNI US33 8.35 Intersect: US-35/4 Ramp8001243 UNI US33 12.43A Intersect: Ramp over SR-245 76466~|~1~|~4~|~04/BRO~|~BR funding for SFN 8001251, UNI-33-8.79 Ramp bridge over C-133/W 5th Street 91605~|~1~|~1~|~01/IMS~|~Funding split for all resurfacing work 96884~|~1~|~1~|~01/BRF~|~Bridge replacement. 112651~|~1~|~1~|~01/IMS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work. 95675~|~1~|~1~|~01/NHS~|~For all work on SR-25 legs of the intersection. 95675~|~1~|~2~|~02/S>2~|~For all work on Gypsy Lane legs of the intersection of SR-25 and Gypsy Lane 95675~|~1~|~3~|~03/S>2~|~Plan split for 100% city funded items 94206~|~1~|~2~|~02/BRO~|~Work to repair two bridges on Interstate 75 in Allen County. Federal and state funds from the District Preservation Program budget. 94206~|~1~|~1~|~01/IMS~|~All the resurfacing work in this project. District Preservation 4PF7 (90% federal) / 4PS7 (10% state) - No Cap - all work on the interstate system. 102768~|~1~|~1~|~01/NHS~|~Bridge Replacement: WAY-250-17.27 (SFN 8504776) 104476~|~1~|~1~|~01/MPO~|~plan split 84522~|~1~|~3~|~03/NFA~|~Two-Lane resurfacing project using a chip-seal treatment. MOE 724 0.00-1.30, NOB 260 8.86-14.35, NOB 724 0.00-2.75. Not on the federal aid system funded 100% State. 84522~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip-seal treatment. MOE 145 8.78-17.87, MRG 83 10.33-15.60, NOB 83 0.00-6.77, WAS 555 1.25-7.66. Rural other federal aid funded 80% Federal and 20% State. 84522~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a chip-seal treatment. WAS 555 0.03-1.25. Urban other federal aid funded 80 federal/20 state. 111273~|~1~|~1~|~01/NFA~|~ODNR Shawnee State Forest 110592~|~1~|~1~|~01/BRO~|~All the work to replace the bridge. District federal and state funds. 115527~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - 80% Federal (4PF7) and 20% State (4PS7). Bridge rehabilitation on KNO SR 13 19.15 L and R (SFN 4200780 and 4200810). 93697~|~1~|~1~|~01/S>2~|~80/20 funding split between the federal MPO STP funds and local funding for project eligible work. 116917~|~1~|~2~|~02/MPO/GREE~|~Widening of S Arlington Rd. 116917~|~1~|~3~|~03/MPO/GREE~|~Reconstruction of S Arlington Rd. 116917~|~1~|~1~|~01/CMQ/GREE~|~Construction of roundabouts at Boettler Rd and Southwood Dr. 123567~|~1~|~1~|~01/SAF~|~Replacing signals with ROW. Locations TBD 92844~|~1~|~1~|~01/STR~|~Bridge Replacement 100900~|~1~|~1~|~01/STR~|~Chip sealHIG 73 15.34-23.48 95813~|~1~|~2~|~02/NFP~|~SR-120 from SLM 14.99 to SLM 17.03 other work (pavement repairs, curbs,...) not eligible for urban paving funding. 95813~|~1~|~1~|~01/S>2~|~SR-120 from SLM 14.99 to 17.03 urban Paving. from face of curb to face of curb up to 3" deep. 97766~|~1~|~1~|~01/NHS~|~Plan split for NHS bridge. 97766~|~1~|~2~|~02/STR~|~Bridge maintenance on rural bridge. 115815~|~1~|~1~|~01/IMS~|~This plan split covers all work associated with installing the micro-duct pathway on the project 108333~|~1~|~1~|~01/S<2~|~OH18-01 ER Event. Landslide repair project. MOE 536 2.26, DSR MOE-019. Urban other federal aid funded 100% federal. 118968~|~1~|~1~|~01/MPO~|~Plan split for path construction. 118968~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 86205~|~1~|~1~|~01/ENH/Shad~|~Shadyside on Central Ave from 37th to 40th, perform a streetscape enhancement project on Central Avenue to include new sidewalks, integral curbs/curb inlets/catch basins, brick paved crosswalks, ornamental lighting, landscaping, furnishings and signing. The conflicting utilities will be relocated by the utility companies prior to construction. Enhancement funds. 86205~|~1~|~2~|~02/MPO/Shad~|~Shadyside on Central Ave from 37th to 40th, perform a streetscape enhancement project on Central Avenue to include new sidewalks, integral curbs/curb inlets/catch basins, brick paved crosswalks, ornamental lighting, landscaping, furnishings and signing. The conflicting utilities will be relocated by the utility companies prior to construction. MPO funds. 115004~|~1~|~1~|~01/MPO/FAIR~|~Resurfacing Broad Street, reduce travel lanes from 4 to 3 to provide bike lanes, widen existing sidewalks, perform access management improvements. 115004~|~1~|~2~|~02/NFP~|~100% locally funded work on city water utilities 108093~|~1~|~1~|~01/NHS~|~Culvert rehab on rural route. 110539~|~1~|~2~|~02/IMS~|~This plan split includes all bridge work on the interstate mainline bridges for minor rehabilitations including sealing, expansion joint repairs, patching, and structural steel repairs. 110539~|~1~|~1~|~01/IMS~|~Resurfacing and pavement repairs on HAM-74 112905~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-203 90836~|~1~|~1~|~01/MPO~|~Installation of new 5' sidewalk; replacement of existing asphalt driveways with concrete aprons with continuous sidewalks through the apron; construction of retaining walls where needed by adjacent grade; installation of trees and other landscaping on the South side of Central Avenue (SR 725) between 12th ST. and Heincke Road. 110687~|~1~|~1~|~01/S<2~|~Construction Inspection 110687~|~1~|~2~|~02/S<2~|~construction Inspection 110687~|~3~|~3~|~03/S<2~|~Construction Inspection 98106~|~1~|~1~|~01/STR~|~Spot Paving various locations in District 11. 118995~|~1~|~1~|~01/STR~|~Resurfacing. 118714~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 6.61-19-746. 118714~|~1~|~2~|~02/S5K~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 19.746-20.23. 109354~|~1~|~1~|~01/SAF~|~Install sidewalk and ADA ramps on the west side of US-42 between Cincinnati and Reading (approx. 1500 ft). 109354~|~1~|~2~|~02/SAF~|~Connect a 500? piece of sidewalk on the east side of US-42 in City of Reading. 119668~|~1~|~1~|~01/NFP~|~Culvert Replacements and field paving. 91374~|~1~|~1~|~01/SAF~|~Belpre City Schools improvement project using SRTS funding for new side walk construction. 100% Federal. 111010~|~1~|~1~|~01/SAF~|~Intersection improvement at STA SR 172 and Perry Drive by adding WB and NB Right Turn Lanes. 111010~|~1~|~2~|~02/S>2/CANT~|~Replacement of waterline along SR 172 from Perry Dr to Saratoga Ave NW and Perry Dr from 12th St SW to SR 172 in the City of Canton. 111010~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 96061~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " Plan Split for Construction of a wash bay at the existing Knox COunty Garage. 116313~|~1~|~1~|~01/NFP~|~Plan split for repairing GR in D6 in all counties, besides Franklin. 100288~|~1~|~1~|~01/MPO~|~Modify, improve and enhance the Pearl Road roadway using MPO TA funding. 103431~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4. 88563~|~1~|~1~|~01/IMS~|~Resurface (smoothseal) LUC IR75 7.82-11.86; LUC-475 from 14.50 to 16.42 88563~|~1~|~2~|~02/IMS~|~Bridge Plan Split 88563~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 92970~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on Kno-US 62-00.00 to 22.65 92970~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Kno-US 62-00.00 to 22.65 92593~|~1~|~1~|~01/NFA~|~Belmount County TID 118356~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at MED-3-20.63/SR-94/SR-606 89447~|~1~|~1~|~01/STR~|~District RPM project. 116031~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP/OT/ " - 4PS7 (100%) 115662~|~1~|~1~|~01/SAF~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%. 105212~|~1~|~1~|~01/S>2/AURO~|~Resurfacing, urban paving in the City of Aurora. 105212~|~1~|~3~|~03/S>2~|~Minor bridge work. 105212~|~1~|~2~|~02/S>2/AURO~|~Full and partial depth repairs. 91150~|~1~|~1~|~01/IMS~|~FRA-270: 24.47-26.42 pavement resurfacing 95876~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management Funding 4SF7(90% Federal) / 4SS7(10% State) - CAP = $350,000.00 Program dollars for Construction and Inspection - Stabilization of the rock foreslope above MUS IR 70 01.76-01.81 91053~|~1~|~2~|~02/S<2~|~D6 federal/state funding for STP route in Marysville:UNI-36: 13.86-13.99 91053~|~1~|~4~|~04/NHS/Mary~|~Urban Paving - D6 federal and Marysville funding for NHS portion within City of Marysville:UNI-36: 6.94-7.68 91053~|~1~|~1~|~01/STR~|~D6 federal/state funding for STP Rural portion:UNI-36: 0-1.74UNI-36: 13.99-18.89 91053~|~1~|~6~|~06/STR~|~bridge work on UNI-36-0.89 (SFN 8001634) 91053~|~1~|~3~|~03/NHS~|~D6 fed/state funding for NHS portion:UNI-4: 0-2.57UNI-36: 1.74-6.94 & 7.68-8.74 91053~|~1~|~5~|~05/NHS/MILF~|~100% Village of Milford Center for catch basins and curb replaced 91053~|~2~|~8~|~08/NHS~|~Part 2-add turn lanes at Collins Rd 91053~|~1~|~7~|~07/NHS~|~Bridge work on five bridges 107060~|~1~|~3~|~03/NHS~|~NHS plan split for Ott-2-10.34 to 14.87 107060~|~1~|~1~|~01/S<2~|~Plan Split for Full depth shoulder repair in Urban sections > 200,000; Tiffin, Fremont and Pt. Clinton urbanized areas 107060~|~1~|~2~|~02/STR~|~Plan Split for full depth shoulder repairs areas in rural sections 107060~|~1~|~4~|~04/S>2~|~Plans split for full depth shoulder repair sections in the Toledo urban area 116615~|~1~|~1~|~01/NHS~|~NHS plan split for resurfacing and resurfacing related items on SR-315. 111566~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work 111566~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 86863~|~1~|~1~|~01/NHS~|~Intersection improvement project at Pike/Green/7th Street. Includes Safety, MPO and Local funding. 90% Federal Safety and 10% State Safety funds. 111381~|~1~|~3~|~03/NHS~|~All items of work associated with the rehab and/or replacement of existing culverts within the existing roadway footprint. 111381~|~1~|~1~|~01/NHS~|~Major General Plan Split - all items associated with the replacement of the existing footprint (excluding drainage work) 111381~|~1~|~2~|~02/NHS~|~Safety plan split - all items associated with widening roadway including culvert extension and work at Jerome Rd 96058~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 3004775 GUE SR265 8.61 Intersect: SR 265 Over Ditch; Not BR Eligible for Replacement or Rehabilitation: Length=18 SD/FO(0) SR=11.5 DSR=5 96058~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Replacement of 3004805 GUE SR265 9.45 Intersect: Over Br Leatherwood Creek: BR Eligible Length = 20' SD/FO(1) SFR=11.5 DSR=4; 108455~|~1~|~1~|~01/IMS~|~Construction of noise barrier on the west side of IR-77 109811~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County. 116339~|~1~|~1~|~01/STR~|~plan split for the rural sections 116339~|~1~|~2~|~02/NHS~|~plan split for the NHS portion of CLI-73 116339~|~1~|~3~|~03/S5K~|~Plan split for the Small urban section 106537~|~1~|~1~|~01/S>2/YOUN~|~Resurfacing, urban paving in the City of Youngstown. 106537~|~1~|~2~|~02/S>2/YOUN~|~Curb ramps and full and partial depth pavement repairs in the City of Youngstown. 106537~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 93530~|~1~|~1~|~01/SAE~|~Sidewalks along Clough Pike, and at Summerside and Glen Este Middle School. 98053~|~1~|~1~|~01/IMS~|~for various bridges. 110091~|~1~|~1~|~01/NHS~|~MAR 23 from 9.74 to 19.97 110091~|~1~|~2~|~02/NHS~|~Twin Structures: MAR-23-10.06 & MAR-23-10.07, SFN: 5100690 & SFN: 5100666 97572~|~1~|~1~|~01/S<2/KCEO~|~"01/S<2/PV/KCEO" - CEAO Funding 4B77 (Federal-80%) / LNTP (Local-20%) - Project CAP 4B77 $1,300,000 - Resurfacing of Knox County Road 7 00.00 to 01.25 (Major Collector Urban) 97572~|~1~|~2~|~02/STR/KCEO~|~"02/STR/PV/KCEO" - CEAO Funding 4B77 (Federal-80%) / LNTP (Local-20%) - Project CAP 4B77 $1,300,000 - Resurfacing of Knox County Road 31 00.00 to 01.92 (Major Collector Rural) 96667~|~1~|~1~|~01/NHS~|~TRU SR 5 from 15.32 to 18.13 96667~|~1~|~2~|~02/S>2~|~TRU SR 7 from 5.61 to 8.41TRU SR 46 from 7.85 to 12.72 and 12.82 to 13.00 and 13.04 to 13.39 96667~|~1~|~3~|~03/S<2~|~ATB SR 534 from 19.34 to 20.35 96667~|~1~|~4~|~04/STR~|~ATB SR 46 from 19.74 to 20.16ATB SR 307 from 3.87 to 7.82 and 8.49 to 12.78TRU SR 45 from 16.69 to 18.30 118358~|~1~|~1~|~01/NFP~|~plan split. 110807~|~1~|~1~|~01/BRO~|~Replace the existing slab bridge 99541~|~1~|~1~|~01/IMS~|~Resurfacing work to be funded at 90/10 fed/state 113800~|~1~|~1~|~01/BRF~|~Bridge replacement. Fed/State exchange project. 101198~|~1~|~2~|~02/NHS~|~NHS for Fine Graded Polymer AC Overlay on the following section: FAY-22-6.26-7.25 101198~|~1~|~3~|~03/S<2~|~STP <200,000 for Fine Graded Polymer AC Overlay for the following sections: FAY-62-10.78-11.73 101198~|~1~|~1~|~01/STR~|~STP Rural for Fine Graded Polymer AC Overlay on the following sections: FAY-22-0.00-6.26; FAY-62-0.00-10.78 101198~|~1~|~5~|~05/STR~|~Work on structure FAY-62-9.06 (2401290) 101198~|~1~|~4~|~04/S<2~|~Paving within Washington CH corp. US 62 11.73 to 11.88 105720~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 101191~|~1~|~1~|~01/BRO~|~District Preservation Program funds. 96533~|~1~|~3~|~03/NHS~|~Plan Split for NHS route: BUT-27 96533~|~1~|~1~|~01/S<2~|~PLan Split for the Sm Urban portions of the project. This includes BUT-732 from SLM 9.85-10.45 96533~|~1~|~2~|~02/STR~|~Plan Split for the Rural portions of the project. This includes BUT-732 from SLM 10.45-13.75 96533~|~1~|~4~|~04/SAF~|~Centerline rumble strips as safety measure. 120858~|~1~|~1~|~01/MPO~|~install safety island and pavement markings 98149~|~1~|~1~|~01/STR~|~ROS 50 (0.00-11.26) 109875~|~1~|~2~|~02/STR~|~WAY SR 0241 04.29 109875~|~1~|~3~|~03/S>2~|~WAY SR 0585 18.43 109875~|~1~|~1~|~01/NHS~|~WAY US 0030 14.83 109875~|~1~|~4~|~04/S5K~|~WAY SR 0003 11.83 25597~|~1~|~1~|~01/NHS~|~Spot Repair Pavement and guardrail work on MAR-23 SLM 10.63-19.97. Includes paving over structure MAR-23-11.92 25597~|~1~|~2~|~02/NHS~|~Bridge repair on 6 structures 83390~|~1~|~1~|~01/ERD~|~Earmark funding for Phase 3B of the Camp Chase BikepathCosntruct multi-use path from Hall Rd to Sullivant Ave, includes new structure over I-270Local Sponsor - FRA County Metro Parks 77527~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 96302~|~1~|~1~|~01/STR~|~D09 GR FY19 123572~|~1~|~1~|~01/SAE~|~FY2032 striping in D8. Routes TBD 106240~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FAY-62-13.17-14.42 106240~|~1~|~3~|~03/S<2/WCH~|~100% Local Items - pavement repairs, etc. 106240~|~1~|~2~|~02/S<2~|~Urban Area Plan Split - FAY-62-14.42 to 14.62 82283~|~1~|~1~|~01/NHS~|~At 0.21 miles south of SR 562 Phase 6 of the HAM-75 corridor projects. Replace RR Bridge No. HAM-75-0722, SFN: 3109992, IORY RR over I-75. 95942~|~1~|~1~|~01/IMS~|~Resurfacing and bridge maintenance work along IR 70 95942~|~1~|~2~|~02/IMS~|~Change order for GUE-77 repair. 122483~|~1~|~1~|~01/ENH/WARR~|~Sidewalk repairs and replacement. 124395~|~1~|~1~|~01/S>2~|~Improvement of 12 crosswalks within the City of Upper Arlington. 92783~|~1~|~1~|~01/NHS~|~Overlay with asphalt concrete:CLA US 40 SLM 9.95 to 10.82 92783~|~1~|~2~|~02/S<2~|~Overlay with asphalt concrete US 40 in Clark County: US 40 SLM 5.29 to 7.23 US 40 SLM 7.23 to 9.95 121691~|~1~|~1~|~01/SAF~|~Radar Replacement. 113484~|~1~|~1~|~01/SAF~|~Village of Leesburg SRTS project. 100178~|~1~|~1~|~01/NHS~|~SR 741 8.66 to 9.54 in the City of Moraine - widen the roadway of the East side to provide a SB left turn lane at Cardington Road and at Industrial Estates Dr. A NB turn lane will be added at Industrial Estates Dr. The alignement of SR 741 to the ramp to NB I-75 will also be modifed. 124595~|~1~|~1~|~01/SAF~|~Install sidewalk on Old 74. 97361~|~1~|~1~|~01/NFP~|~Mowing 116245~|~1~|~1~|~01/NHS~|~Double application microsurfacing. 116769~|~1~|~1~|~01/NHS~|~Resurfacing. 105095~|~1~|~1~|~01/STR~|~HIG 41 2.02 Culvert Replacement 102925~|~1~|~2~|~02/BRO~|~Split for WOO-235-0614 structure 102925~|~1~|~1~|~01/BRF~|~Split for WOO-235-0644 structure 96347~|~1~|~1~|~01/SAE~|~100% federal participitation on SRTS eligible work items. 114894~|~1~|~1~|~01/NHS~|~Resurfacing. 114894~|~1~|~2~|~02/S>2~|~Resurfacing. 114894~|~1~|~3~|~03/STR~|~Minor bridge work. 83541~|~1~|~1~|~01/BRF~|~CEAO BR funds to replace CR-22/Scioto Darby Rd structure over Big Darby Creek, SFN 6530192Local Spnsor - PIC County Engineer 98372~|~1~|~1~|~01/IMS~|~Major New funding to cut trees prior to 4/1/15 91992~|~1~|~1~|~01/STR~|~PIK SR124 0.00 - 7.53 resurfacing projectOn SR124, begin project @ Highland Co. Line, south for 7.53 miles and terminate 0.02 miles south of CR6 (Lapperell Rd.). Brdg to pave thru:6601189 PIK SR124 6.52 Intersect: Dry Bone Creek80/20 split 91992~|~1~|~2~|~02/STR~|~PIK SR124 Brdgs F/Rehab:6601111 PIK SR124 4.21 Intersect: Little Sunfish Creek6601146 PIK SR124 5.99 Intersect: Sunfish Creek80/20 split 92133~|~1~|~1~|~01/STR~|~resurface Woo- SR 25 1.75-6.29 92133~|~1~|~2~|~02/S<2~|~resurface Woo SR 25 6.29-8.42 92133~|~1~|~3~|~03/STR~|~Rural Bridges - Waterproofing and Seal & saw joints 92133~|~1~|~4~|~04/S<2~|~Urban area bridge - Waterproofing and Seal & Saw joints 124423~|~1~|~1~|~01/SAE~|~Roundabouts 103586~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds. 91734~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a fine graded polymer treatment. HOC 33 16.06-18.48. NHS route funded 80 federal/20 state. 103399~|~1~|~1~|~01/STR~|~Slide repair. 105662~|~1~|~2~|~02/NFA~|~Plans Split for Hen SR 18 8.462 culvert 105662~|~1~|~1~|~01/STR~|~Culvert HEN-281 @2.35 - on Fed. aid system 118881~|~1~|~1~|~01/STR~|~Resurfacing BEL-149 101236~|~1~|~1~|~01/NHS~|~Resurfacing on NHS eligible portion (approx 73% of total cost) includes slm 2.3-5.87 and 10.65-11.26. 122089~|~1~|~1~|~01/BRO~|~Bridge Replacement 104836~|~1~|~1~|~01/NFP~|~Plan split for guardrail repairs on the highway system 107758~|~1~|~1~|~01/NHS~|~Covers all work to rehab bridge. 121697~|~1~|~1~|~01/SAF~|~Radar detectors. 93572~|~1~|~1~|~01/MPO/HUR~|~Bike path in the City of Huron 80% ECRCP/20% Huron. 93572~|~1~|~2~|~02/ENH/HUR~|~Bike Path within the City of Huron, 100% City funds above cap. 106436~|~1~|~1~|~01/BRF~|~Deck Replacement; Federal/State Exchange eligible project. 80% State 4C87/20 Local LNTP. 94143~|~1~|~1~|~01/NFA/GCPA~|~"01/NFA/PV/GCPA" Guernsey County Port Authority Project utilizing various funds for resurfacing of Hope Ave (CR247) Funds (ARC $148,110, State 629 $50,000, Jackson Township $21,027. 87383~|~1~|~1~|~01/S>2~|~Replace bridge with deficient deck and wearing surface with minimal approach work on SFN 5709393 MOT 201 5.31 SR 201 over a tributary to Mad River, 3.85 mile South of IR 70 and .5 mile South of Huber Heights Corporation Limit. 79760~|~1~|~1~|~01/NHS~|~Resurfacing 124245~|~1~|~1~|~01/IMS~|~Plan split for WOO-75 & WOO-475 124245~|~1~|~2~|~02/NHS~|~Plan split for pavement markings for HEN-24, LUC-24, SAN-20 & WOO-20 105358~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal route:AUG SR 198 SLM 4.85 to 7.90 105358~|~1~|~3~|~03/S<2~|~Chip seal on small urban route:AUG SR 198 SLM 2.67 to 3.75 105358~|~1~|~1~|~01/STR~|~Chip seal on rural routes: AUG SR 219 SLM 7.71 to 14.12MER SR 197 SLM 3.37 to 6.33MIA SR 721 SLM 0.00 to 2.82MIA SR 721 SLM 3.22 to 5.52AUG SR 67 SLM 8.25 to 13.48AUG SR 67 SLM 14.43 to 18.94AUG SR 198 SLM 3.75 to 4.85AUG SR 219 SLM 0.00 to 1.09AUG SR 219 SLM 1.09 to 4.11AUG SR 219 SLM 4.11 to 6.84MIA SR 718 SLM 0.00 to 3.26 96729~|~1~|~1~|~01/NFA~|~Trumbull County Cortland Garage, build new fabric salt building - tonnage and size to be determined. Tear down 2 salt storage structures. 116181~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV/ 102551~|~1~|~1~|~01/STR~|~plan split for the Rural sections 98584~|~1~|~1~|~01/STR~|~Replace small culverts BUT-129-0186, BUT-503-0273, and BUT-503-0579. Maintain small culverts BUT-503-0322 and BUT-744-0919. 98584~|~1~|~2~|~02/IMS~|~Maintain small culverts HAM-71-1987 and HAM-71-1090. 98584~|~1~|~3~|~03/NHS~|~Pave invert BUT-129-2431 98584~|~1~|~4~|~04/STR~|~Water work relocation at BUT-129-0186. 100332~|~1~|~1~|~01/NFP~|~This is the district?s annual long line pavement marking project. 98599~|~1~|~1~|~01/IMS~|~Plan split for bridges eligible for IM funds 98599~|~1~|~3~|~03/S>2~|~Split for work on the STP bridge 98599~|~1~|~2~|~02/BRO~|~Split for bridges eligible for BR funding at 90/10 98599~|~1~|~4~|~04/BRO~|~Split for bridge eligible for BR funding on the NHS at 80/20. 98599~|~1~|~5~|~05/BRO~|~Ongoing services for the structures listed 92553~|~1~|~1~|~01/SAF~|~Add southbound left turn lane from US42 to Ledbetter 86728~|~1~|~1~|~01/STR~|~WAY 94 14.16-21.25/ WAY 585 11.95-13.92/ WAY 585 14.78-15.87 86728~|~1~|~4~|~04/STR~|~Structure work for: SFN 8504059 (WAY 94 16.74), SFN 8504083 (WAY 94 18.30), SFN 8504113 (WAY 94 19.00), SFN 8506124 (WAY 585 15.14) 86728~|~1~|~2~|~02/S<2~|~MED 94 0.00-1.16/ WAY 94 21.25-21.48 86728~|~1~|~6~|~06/NHS~|~Structure work (< 20' length): SFN 8506248 (WAY 585 18.51) 86728~|~1~|~3~|~03/NHS~|~WAY 585 15.87-18.70 86728~|~1~|~5~|~05/NHS~|~Structure work for: SFN 8506213 (WAY 585 16.48) 108361~|~1~|~1~|~01/NFP~|~ODNR - Harrison State Forest. 103508~|~1~|~2~|~02/NHS~|~Split for MPO funds 103508~|~1~|~3~|~03/NHS~|~100% other 103508~|~1~|~1~|~01/NHS~|~Urban paving - top 3.25" of paving 118353~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at ERI-269-3.67/Portland Rd 118353~|~1~|~2~|~02/NFP~|~Erie County water line work. 107928~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 in Defiance County outside the Defiance urban area. From the Defiance Urban Area boundary at SLM 9.08 to the county line at 15.54. Uses district preservation funds (80% Fed and 20% State). No local funds. 107928~|~1~|~2~|~02/S<2~|~Resurfacing on SR 66 in Defiance County inside the Defiance urban area but outside of the City of Defiance. On both sides of the road from the beginning of the project where SR 66 leaves the City of Defiance at SLM 7.82 until SR 66 enters the City of Defiance at SLM 7.83 then on the left side of the road starting where SR 66 leaves the City at SLM 7.99 until SR 66 leaves the City on the right side at SLM 8.04 then on both sides of the road to the Defiance Urban Area boundary at SLM 9.08. Uses district preservation funds (80% Fed and 20% State). No local funds. 107928~|~1~|~4~|~04/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds. 107928~|~1~|~3~|~03/S<2/DEF~|~Resurfacing on SR 66 in Defiance County inside the City of Defiance. On both sides of the road from where SR 66 enters the City of Defiance at SLM 7.83 then on the right side of the road when SR 66 leaves the City on the left side at SLM 7.99 until SR 66 leaves the City on the right side at SLM 8.04. Uses federal district preservation funds with a 20% City of Defiance match. 107928~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment 86839~|~1~|~3~|~03/S<2/Shel~|~100% City of Shelby items 86839~|~1~|~1~|~01/S<2~|~District Allocation (4PF7/4PS7) for pavement outside of Shelby Corp. Limits 86839~|~1~|~2~|~02/S<2/Shel~|~Urban Paving: District/City (4PF7/4BG7) project eligible items within City Corp. Limits 86839~|~1~|~4~|~04/S<2~|~Bridge workSFN: 7001975 RIC-39-3.51SFN: 7003145 RIC-61-4.79 101416~|~1~|~1~|~01/STR~|~Plan Split 01 is a STP Rural category, includes SR and US 112839~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 45 from 11.77 to 14.15. 112839~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span. 112839~|~1~|~3~|~03/STR~|~Minor bridge rehab > 10' to 20' span. 122334~|~1~|~1~|~01/NFP~|~Plan split for district wide tree removal 98640~|~1~|~3~|~03/IMS~|~Trenchless culver repairs SHE-75-12.73 & SHE-75-13.18 98640~|~1~|~1~|~01/NFA~|~LOG-287-07.76 trenchless culvert repairs. 98640~|~1~|~2~|~02/STR~|~DAR-36-00.70 - LOG-292-17.92 trenchless culvert repairs. 122810~|~1~|~1~|~01/ENH~|~Funding split for TAP (CRP / Safety) funded plan split. 122810~|~1~|~2~|~02/NFP~|~Plan Split for scope not eligible for TAP/CRP/Safety 102197~|~1~|~1~|~01/STR~|~All work to replace the culverts. District Preservation Program funds. 80% federal SAC 4PF7 and 20% state funds SAC 4PS7. 121599~|~1~|~1~|~01/NFA~|~Resurfacing 121599~|~1~|~2~|~02/S>2~|~Resurfacing 96518~|~1~|~1~|~01/IMS~|~Resurfacing 96518~|~2~|~3~|~03/IMS~|~Superstructure replacements. 96518~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance > 20' span. 124864~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. 83706~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 681 9.25-17.49. Rural other federal aid funded 80 federal/20 state. 83706~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 117187~|~1~|~1~|~01/IMS~|~Replace fence on top of retaining walls adjacent to IR 670 117187~|~1~|~2~|~02/IMS~|~Aesthetic enhancement of fence 122805~|~1~|~1~|~01/SAF~|~All work included in the split. 120625~|~1~|~1~|~01/IMS~|~Split for Bridge Preservation work, Deck Sealing. 107378~|~1~|~1~|~01/NHS~|~Split for paving work on the NHS 94124~|~1~|~2~|~02/NHS~|~0800798080020136004323600440 94124~|~1~|~1~|~01/STR~|~Deck Sealing Preventive Maintenance project3604179 114990~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using a chip seal treatment. 114990~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using a chip seal treatment. 95461~|~1~|~1~|~01/STR~|~Pavement Reconstruction on Per-SR 13-19.83 to 28.15 100963~|~1~|~1~|~01/S<2~|~Chip seal POR SR 305 from 0.48 to 1.66. 100963~|~1~|~2~|~02/STR~|~Chip seal POR SR 305D from 0.00 to 0.09 and POR SR 305 from 1.66 to 5.65. 103367~|~1~|~1~|~01/STR~|~Emergency project to repair a landslide. WAS CR 60 5.33. DSR WAS-001. 120256~|~1~|~1~|~01/S>2~|~Pavement reconstruction and associated improvements on SR 37 115375~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4. 115375~|~1~|~2~|~02/NFP/CANT~|~Wet reflective pavement markings on the Urban System in Canton. 115375~|~1~|~3~|~03/NFP/LOUI~|~Wet reflective pavement markings on the urban system within the City of Louisville. 115375~|~1~|~4~|~04/NFP/MACE~|~Wet reflective pavement markings on SR 8 (urban system), in the City of Macedonia. 91144~|~1~|~1~|~01/SAF~|~Two-year guardrail repair (ding and dent) contract for FY 2016 and 2017. 100% State. 119493~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County. 82382~|~1~|~1~|~01/IMS~|~Plan split for major rehab to CCG3A pavement and conduit work. 82382~|~1~|~2~|~02/IMS~|~Plan split for bridge replacement and removal. 82382~|~1~|~3~|~03/IMS~|~Plan Split for new bridges 104120~|~1~|~1~|~01/ENH~|~Multi use path. 116192~|~1~|~1~|~01/NFP~|~Bridge Maintenance Project 118663~|~1~|~1~|~01/SAF~|~Pavement Marking. 77942~|~1~|~1~|~01/STR~|~For Bridge Nos. GRE-72 1876 and 1883, SFNs: 2902079 and 2902109 respectively: replace the existing concrete slabs on existing substructure units and perform other minor rehabilitation. The bridges carry SR 72 over the Little Miami River (1876) and a tail race to the Little Miami River (1883). 104765~|~1~|~1~|~01/NFP~|~Security system for SUM Interchange outpost. 109621~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - No CAP - 90% Federal (4PF7)/10% State (4PS7) - replacement of tower lighting with partial interchange lighting. 122890~|~1~|~1~|~01/NFP~|~All work included in this plan split. 90390~|~1~|~1~|~01/CMQ~|~CMAQ funding to upgrade signals at 9 intersections in Grandview Heights 109519~|~1~|~1~|~01/SAF~|~Work at the interchange of US42 and US33 including widening the off ramps to provide turn lanes, minor work at the on ramps and installing signals. 103136~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY20 Construction Engineering Services 103136~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY21 Construction Engineering Services 96249~|~1~|~1~|~01/SAF~|~A DDI at SR-25/I-475 interchange in Perrysburg. 96249~|~2~|~2~|~02/SAF~|~Second split for City of Perrysburg particle funded items 96249~|~1~|~3~|~03/NFP~|~100% Costco funded split to pay for the fence upgrade. Upgrade will be per foot @? Unit Price of Chain Link Fence (upgrade): $17.22/ft.? Unit Price of Woven Wire Fence (current): $9.70/ft.? Quantity of Fence: 714 ft.? UP Difference = $17.22/ft. - $9.70/ft. = $7.52/ft. 95862~|~1~|~1~|~01/NFP~|~@SLM 7.77 117085~|~1~|~1~|~01/NFA~|~D09 HS FY2024 95167~|~1~|~1~|~01/STR~|~Landslide cause by an oversteepened embankment. Extend culvert and regrade slopes. 116111~|~1~|~1~|~01/SAF~|~100% CEAO HSIP funding for upgrading guardrail on various county roads 101612~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal)/4PS7(10% State) - No CAP - Resurfacing with related work on Gue-IR 70-22.80 to 28.48 108969~|~1~|~1~|~01/ENH~|~Connect existing sidewalks on N. Plains Road (SR 682) to existing facilities at the Athens High School via proposed sidewalks along Elm St., Oak St., and the block of N. McDonald St. bounded by Elm St. and Oak St. 108969~|~1~|~2~|~02/S<2~|~100% Township items. 116241~|~1~|~1~|~01/STR~|~Overlay in SCI. 87201~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split. 102570~|~1~|~1~|~01/NFA~|~All work on SR 701 in Hardin County and which is from SR 309 to US 68 (0.00 to 8.93). All work on SR 709 in Van Wert County which is from SR 118 to SR 116 (0.00 to 9.20) 102570~|~1~|~4~|~04/NHS~|~Work on SR 309 in Allen County from the beginning of the project at Devonshire Drive (15.99) to Perry Chapel Road (17.37). Federal NHS funds. All funds are from the District Preservation Program budget. No local funds. 102570~|~1~|~5~|~05/NHS/LIMA~|~Work on SR 65 in Allen County from Fourth Street (5.10) to Elm Street (6.58). Federal NHS funds from the District Preservation Program budget with the 20% match provided by the City of Lima. 102570~|~1~|~3~|~03/STR~|~Work on SR 309 in Allen County from Thayer Rd.(18.19) to the Hardin County Line. All work on SR 2 in Defiance County. Work on SR 697 in Van Wert County from SR 116 at 0.00 to the Delphos Urban Area boundary at 5.54. Work on SR 235 in Hardin County from SR 309 at 15.99 to the south boundary of the Ada Urban Area at 16.80. 102570~|~1~|~2~|~02/S<2~|~Work on SR 697 in Van Wert County from the Delphos Urban Area boundary at 5.54 to the west corporation limits of the City of Delphos at 6.58.Work on SR 309 in Allen County from Perry Chapel Road (17.37) to the Lima Urbanized boundary at Thayer Road (18.19). Work on SR 117 from just east of Greely Chapel Rd (19.14) to Bowman Rd. (19.97). Work on SR 235 in Hardin County from the Ada Urban Area boundary at 16.80 to the north corporation limits of the Village of Ada at 19.26. Work on SR 81 in Hardin County from the west corporation limits of the Village of Ada at 2.25 to the east corporation limits of the Village of Ada at 6.58. All funds are from the District Preservation Program budget. No local funds. 112327~|~1~|~1~|~01/SAF~|~JAC 93 14.29-17.46 Signal Upgrade 122426~|~1~|~1~|~01/BRO~|~Replace superstructure on bridge carrying US 62 over Wolf Creek. 119127~|~1~|~1~|~01/S>2~|~Resurfacing. 119127~|~1~|~2~|~02/STR~|~Resurfacing. 92451~|~1~|~1~|~01/STR~|~$512,996 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) program. Funds over this amount will come from District Preservation Program funds. 79374~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1808567 92129~|~1~|~1~|~01/S>2~|~resurface Woo US 6 11.75-14.81; from about Rudolph to I-75 92129~|~1~|~2~|~02/STR~|~resurface Woo US 6 14.81-17.46; from I-75 to about Chamberlain Road 114780~|~1~|~1~|~01/IMS~|~Cost to rehabilitate and paint Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati including necessary work on WHT. 104095~|~1~|~1~|~01/IMS~|~This split is for the costs associated with removing both mainline IR75 bridges over the abandoned railroad using District preservation allocations from SACs 4PF7 and 4PS7. 104095~|~1~|~2~|~02/IMS~|~Pavement work in the project using District preservation program funds SAC 4PF7 and 4PS7. 119513~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 109825~|~1~|~1~|~01/STR~|~Overlay in Highland County. 109825~|~1~|~2~|~02/S<2~|~Overlay in Highland County. 109825~|~1~|~4~|~04/S<2~|~Bridge PM work. 109825~|~1~|~3~|~03/STR~|~Bridge PM work. 117279~|~1~|~2~|~02/STR~|~Traffic signal work at the intersection of State Route 78 and County Route 56. 117279~|~1~|~1~|~01/SAF~|~NOB SR 78 at 7.15 Intersection/CR 56. Funded 90% Federal Safety/10% State. 117279~|~1~|~3~|~03/SAF~|~NOB SR 821 8.014 includes sidewalks, curb ramps, crosswalk and an RRFB. Funded 90% Federal Safety/10% Local. 25735~|~1~|~2~|~02/NHS~|~Bridge rehab work (sealing, asphalt OL) on 11 structures:2515636 FRA SR315 5.18 Intersect: Ackerman2515520 FRA SR315 5.92 Intersect: Ramp(315NB To W.N.Brodwy)2515539 FRA SR315 6.17 Intersect: Over Olentangy River Road2515555 FRA SR315 6.17 B Intersect: Over Olentangy River Road2515563 FRA SR315 6.27 Intersect: Over West N.Broadway2515679 FRA SR315 7.44 Intersect: Pedestrian Overpass2515717 FRA SR315 7.78 Intersect: Over Henderson Rd2515741 FRA SR315 8.56 Intersect: Bethel Rd2515822 FRA SR315 9.85 Intersect: Over Park Access Road2515830 FRA SR315 9.85 Intersect: Over Park Access Road2515903 FRA SR315 11.66 Intersect: Wilson Bridge RdNot BR eligible - in NHS portion of project03/NHS/BR/ 25735~|~1~|~1~|~01/NHS~|~Pavement minor rehab on SR-315 from SLM 5.18-11.82 (Ackerman to 270) Includes paving of Bethel Rd from Olentangy River Rd to SR-315 ramp and upgrade of signal at Bethel Rd and Olentangy River Rd01/NHS/PV/ 97842~|~2~|~2~|~02/BRF/BEL~|~OBPP replacement of SFN 0731978 97842~|~1~|~1~|~01/BRO/BEL~|~OBPP replacement of SFN 0730394 93763~|~1~|~1~|~01/NHS~|~Overlay bridge deck with mirosilica concrete and reface abutments using anodes and catch floor spalls along abutment with refacing with haunches or additional facing width, use anodes in this area on SFN 5701147 MOT 4 2264 L and on SFN 5701171 MOT 4 2264 R. 106696~|~1~|~1~|~01/S<2~|~Rehab historic bridge. 107000~|~2~|~2~|~02/STR~|~Superstructure replacement at SLM 1.2 107000~|~2~|~3~|~03/STR~|~Bridge replacement at SLM 2.0 107000~|~1~|~1~|~01/STR~|~Replace box culvert at SLM 4.06 90200~|~1~|~1~|~01/IMS~|~Study for preferred alternative concept in the vicinity of the Existing I-71 and US 36/SR 37 Interchange in Delaware County 118882~|~1~|~1~|~01/STR~|~Resurfacing SR 43 118779~|~1~|~1~|~01/NFA~|~added split. 112950~|~1~|~1~|~01/STR~|~Rural Plan Split: PIC-159-0.00-9.41 PIC-207-0.00-9.57 116037~|~1~|~1~|~01/BRF~|~Replace SFN 2561100 93082~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete on AUG SR 66 11.86 to 12.72. Urban Paving Program. 93082~|~1~|~2~|~02/S>2~|~Pavement planing and resurfacing with asphalt concrete. AUG SR 66 12.72 to 13.22 Urban Paving Program. 93082~|~1~|~3~|~03/STR~|~Resurface the existing roadway with asphalt concrete. AUG SR 66 13.23 to 22.41. This is outside of St. Mary's corp limit. 121346~|~1~|~1~|~01/NFP~|~Created for TID Involvement 124014~|~1~|~1~|~01/NFP~|~Created for J&C Task Order 123103~|~1~|~1~|~01/NHS~|~Plan split to program project, update during project scoping. 100841~|~1~|~1~|~01/S<2~|~Slide Repairs - Locations TBD 96889~|~1~|~1~|~01/BRF~|~Bridge replacement. 117876~|~1~|~1~|~01/NFA~|~Plan split for federally eligible construction items. 90825~|~1~|~1~|~01/NFA~|~Install communications backbone to allow the traffic signals to operate as a closed loop system; upgrade old traffic signal controllers; install system and intersection approach detection for improved system perfomance; and puchase software package for remote monitoring of the upgraded system on SR 41 via the Traffic signal upgrade project. MIA SR 41 from SLM 10.90 to 11.95. 97213~|~1~|~1~|~01/NHS~|~Project to perform the following drainage work in Butler County. Pave invert with concrete for culverts BUT-129-2232, BUT-129-2258, BUT-129-2463R, BUT-129-2468L, BUT-129-2505, and BUT-129-2560. Replace/reconstruct portions of BUT-129-2178 that conflicted with sounwall post and pave invert or line remainder of culvert. Replace inlet concrete apron at BUT-129-2232.Replace a portion of HAM-4-3.65 and line with CIPP and reconstruct 2 catch basins. 119646~|~1~|~1~|~01/NFP~|~Created for J&C involvement 118687~|~1~|~1~|~01/S>2~|~Resurfacing STP > 200,000 118687~|~1~|~2~|~02/STR~|~Resurfacing - Rural 118687~|~1~|~3~|~03/CMQ~|~CMAQ - Construct northbound left turn lane at Schiller Road 118687~|~1~|~4~|~04/SAF~|~Safety improvements including shoulder widening, rumble stripes, and guardrail upgrades. 107021~|~1~|~1~|~01/STR~|~LOR SR 511 0.00 to 13.41 113688~|~1~|~1~|~01/SAF~|~All work to construct the cul-de-sacs are in this plan split. Funds are from the safety program with funds needed is the estimate exceeds the safety program cap provided by the District. 109008~|~1~|~1~|~01/ENH~|~Trans. Alternative Plan Split 109789~|~1~|~1~|~01/NFP~|~Sewer repair work 92415~|~1~|~1~|~01/NFA~|~Shawnee Preserve Reserve - Microsurfacing and striping of exisiting parking lot. 93646~|~1~|~2~|~02/STR~|~Portion of project outside the Lima Urbanized area. There are no local funds in this split. All funds, both state and federal, are from the District Preservation Program budget. SR 115 from the Urbanized Boundary at 0.42 to the end of the project at 4.92. 93646~|~1~|~1~|~01/S<2~|~Portion of project inside the Lima Urbanized area. Although inside the Urbanized area, this portion of the project is outside the the City of Lima. Therefore, there are no local funds in this split. All funds, both state and federal, are from the District Preservation Program budget. SR 115 from the beginning of the project at SR 65 to the Lima Urbanized Boundary at 0.42. 116893~|~1~|~1~|~01/S>2~|~Resurfacing 113471~|~1~|~1~|~01/BRO~|~CEAO funded bridge rehab of Harrisburg-Georgesville Rd over Big Darby Creek 113471~|~1~|~2~|~02/BRF~|~CEAO funded bridge rehab of Harrisburg-Georgesville Rd over Big Darby Creek 94636~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split using MPO STP for the resurfacing of Madison Avenue. 93799~|~1~|~1~|~01/STR~|~Replace Brdg 0103993Project Termini: Located 0.86 mile south of SR137 on SR247. Project Description: It is proposed to replace the dificient structure. 80/20 split01/STR/BR/State 91456~|~1~|~1~|~01/STR~|~Slide repair SR 800 1.97 99782~|~1~|~2~|~02/NHS~|~Rebuild signal at Central and Marshal, Local will participate at 50/50 split. 99782~|~1~|~1~|~01/SAF~|~Plan split includes signal upgrades at Central Parkway and Liberty St and all associated work. 114287~|~1~|~1~|~01/IMS~|~Mowing contract in D8 114287~|~1~|~2~|~02/IMS~|~Plan Split for mowing in D7 110110~|~1~|~1~|~01/IMS~|~Rehabilitate bridges HAM-71-0226 that carries Elsionre Place over I-71 by painting, replace the drainage and vandal protection fencing and reconstructing the beam seat. Rehabilitate HAM-71-0294 that carries McGregor over I-71 by replacing the joints, Vandal Fence, and painting the structural steel. Rehabilitate HAM-71-0344 that carries Oak St over I-71 by replacing the bearings, joints, fence, and painting the structural steel. 92642~|~1~|~1~|~01/MPO~|~mill & fill 97166~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 278 5.69, SFN 8201897. Rural other federal aid funded 80 federal/20 state. 108536~|~1~|~2~|~02/S5K~|~Resurfacing within the Marysville Urban Area. UNI-CR 133-4.48 to 5.18 108536~|~1~|~1~|~01/STR~|~Resurfacing outside the Marysville Urban Area. UNI-CR 133 0.00 to 4.48 and UNI CR 165-0.64 to 2.34 117976~|~1~|~1~|~01/NFP~|~Craig Memorial Bridge and Port Clinton Lift Bridge 116548~|~1~|~1~|~01/MPO/GRNT~|~Improvements to the intersection of Werk and Westbourne Roads. 93049~|~1~|~1~|~01/MPO~|~Upgrade sidewalks and curbs 102785~|~1~|~1~|~01/NFA~|~Landslide/Culvert repair project. MRG 607 0.76. 110656~|~1~|~1~|~01/STR~|~All work to resurface the road is in this plan split. Federal and state funds from the District Preservation Program budget. No local funds. 114318~|~1~|~1~|~01/IMS~|~Spot Repair on Interstate 71 110959~|~1~|~1~|~01/SAE~|~Installation of cable barrier. Funding is 100% federal funds from the Safety Program until the cap is reached then District Preservation Program funds will be used. 18710~|~1~|~2~|~02/BRO~|~Rehab of BR eligible structure. SUM-SR176-1.06, also known as Broadview Road. SFN# 7707746. 18710~|~1~|~3~|~03/BRO~|~Rehab of sfn# 7708858, SUM-IR271-2.94, also known Brecksville Road. Summit County, Ohio. Funded with District Preservation. 18710~|~1~|~1~|~01/IMS~|~Total reconstruction of SUM-IR271, from SLM 2.33 to SLM 6.59 18710~|~1~|~6~|~06/IMS~|~Rehab of SUM-SR303-5.02 (SFN#770900). NOT BR eligible. Funded with District Preservation. 18710~|~1~|~4~|~04/BRO~|~Rehab of three structures. SUM-IR271-3.54B (SFN#7708882). SUM-IR271-3.75L (SFN#7708912). SUM-IR271-3.75R (SFN#7708947). Funded with Major Rehab dollars. 18710~|~1~|~5~|~05/IMS~|~Rehab of three structures that are NOT BR eligible. SUM-IR271-3.54L (SFN# 7708815). SUM-IR271-3.54R (SFN# 7708890). SUM-IR271-4.83 (SFN# 7708971). Funded with Major Rehab dollars. 103303~|~1~|~1~|~01/NFP~|~Split for resurfacing work 115308~|~1~|~1~|~01/MPO~|~Resurfacing. 98220~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Crack sealing on various routes in District 5 114640~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 98358~|~1~|~1~|~01/SAF~|~Replace signals at Broad St at Hague Ave and Sullivant Aveat Hague Ave 119826~|~1~|~1~|~01/NHS~|~Reconstruct roadway & construct sidewalks 122391~|~1~|~1~|~01/IMS~|~This plan split is for the new CCTV cameras at all eight locations in District 11. 122030~|~1~|~1~|~01/NFA~|~Slide repair. 104417~|~1~|~1~|~01/MPO~|~plan split 88760~|~1~|~1~|~01/STR~|~District Allocation 88760~|~1~|~3~|~03/S<2~|~District Allocation/City Funds (waived). City of Galion Split Corp CRA-097-00.83 - 01.08. City contribution waived as per District Policy 88760~|~1~|~2~|~02/S<2~|~Urban Paving - District Allocation 88760~|~1~|~4~|~04/STR~|~100% City Funds (waived). City of Galion Split Corp CRA-097-00.83 - 01.08 City contribution waived as per District Policy 107675~|~1~|~1~|~01/STR~|~Resurfacing on SR 81 using district preservation funds (80% 4PF7 and 20% 4PS7). 115479~|~1~|~1~|~01/NFP~|~Added a split 91626~|~1~|~1~|~01/STR~|~BRO SR 221 6.50 Slide RepairOn SR 221, project is 1.5 miles south of its intersection with SR125. It is proposed to repair the slide under Federal Declaration 2011-02. 100% state 01/STR/OT/State 88023~|~1~|~1~|~01/BRO~|~3502155 HEN SR66 4.82 Intersect: Tributary Of Brush Creek 92609~|~1~|~1~|~01/STR~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete on MER SR 118 10.39 to 13.42 from Corp Limit of the Village of Coldwater to Junction of SR 118 and SR 29. 92609~|~1~|~2~|~02/S<2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete in Coldwater. MER-SR-118 8.39 to 10.39 124823~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 681 10.31 (SFN 5303451). 116777~|~1~|~1~|~01/STR~|~MED SR 0094 19.93. 111479~|~1~|~1~|~01/BRF~|~Replacement of 5th Street Bridge (SFN 4460057). This is apart of the municipal bridge program. 95186~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 513 0917 (SFN 6104088). 122140~|~1~|~1~|~01/NFP/STRU~|~Construct side path. 83600~|~1~|~1~|~01/SAF~|~Plan Split for Urban Area for TRU CR 142 4.68 to 4.70 and TRU CR 328 2.77 to 2.79 95137~|~1~|~1~|~01/NFP~|~Culvert repair work under I-480 117453~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes. 123743~|~1~|~1~|~01/NFA~|~To provide a maintenance contract to maintain the highway lighting system for roadway lighting on the state-maintained highway system throughout District 11. 81228~|~1~|~2~|~02/S5K~|~Resurfacing and related work along SR 821 in the village of Byesville. 81228~|~1~|~1~|~01/STR~|~Resurfacing and related work along SR 821,146 & 265. 116286~|~1~|~1~|~01/NFA~|~Overlay project. 110931~|~1~|~1~|~01/IMS~|~Construction of noise walls along MAH IR 680. 107506~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SR 9 to CR 4 117074~|~1~|~1~|~01/SAF~|~All work in this project. Safety funds will be used until the cap is reached, then District Preservation Program funds will be used. 95963~|~1~|~2~|~02/S<2/ZANE~|~District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing with related work in the City of Zanesville Mus-146-(10.39-10.49) 95963~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 7BPB (100% Bond) or 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comments - Resurfacing with related work on Mus-146-(2.21 to 9.93) 95963~|~1~|~3~|~03/S<2~|~District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-SR 146-(9.93 to 10.39), Mus-SR 146-(10.49 to 12.20). 95963~|~1~|~4~|~04/STR~|~Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - Safety initiative to add Center line Rumble Strips. Mus-SR 146-2.21 to 9.93 95963~|~1~|~5~|~05/S<2~|~Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - Safety Initiative to ass Center Line Rumble Strips. Mus SR 146-9.93 to 10.39 113014~|~1~|~1~|~01/STR~|~ADA-770-3.45 SFN 0104469 91507~|~1~|~1~|~01/STR~|~General system resurfacing of SR-29: 10.71-13.00 and SR-41: 0.00-3.85 88912~|~1~|~2~|~02/STR~|~not BR Eligible: SFN 7804571 5.25 SR82 OVER MAHONING RIVER. 88912~|~1~|~1~|~01/STR~|~Resurfacing SR 82 0.00-5.31 and SR 305 1.59-2.47 123308~|~1~|~1~|~01/IMS~|~Bridge repair project. Fiber wrap column. 102038~|~1~|~1~|~01/STR~|~Old State Line Rd 124404~|~1~|~1~|~01/IMS~|~Slide repair. 99661~|~1~|~1~|~01/STR~|~WOO-64 from SLM 10.10 to SLM 10.35 87296~|~1~|~2~|~02/S<2~|~Resurfacing on SR 147 and SR 149 in the Bridgeport-Wheeling urban area 87296~|~1~|~3~|~03/STR~|~Resurfacing on SR 145 87296~|~1~|~1~|~01/NFA~|~Resurfacing on SR 148 87296~|~1~|~4~|~04/NHS~|~Resurfacing of BEL-7 from SLM 0.00 to SLM 2.26 including pavement repairs and pavement markings. 87296~|~1~|~5~|~05/S<2~|~Work associated with the water line repair on SR 147 within the Village of Bellaire. 107754~|~1~|~2~|~02/STR~|~All items of work associated with DEL-229-0.36, DEL-229-1.56, DEL-229-2.29 and DEL-229-3.25. 107754~|~1~|~1~|~01/STR~|~All items of work associated with DEL-229-0.93, DEL-229-1.49 and DEL-229-3.48. 100287~|~1~|~1~|~01/IMS~|~Double Microsurfacing to STA 77 from 9.50 to 11.84 100287~|~1~|~2~|~02/S>2~|~Single and Double Microsurfacing to STA 687 from 0.00 to 0.36 and 2.57 to 5.52. 100287~|~1~|~3~|~03/IMS~|~See linked structures. 95333~|~1~|~1~|~01/S<2/LCEO~|~"01/S<2/BR/LCEO" - Licking County Engineer Project - Replacement of twin culverts with new bridge structure. Project funding utilizing LCATS STP funding w/ a federal max of $158,851. 94202~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on all lanes of SR 748 in Butler County between SR 126 and SR 129. BUT SR 748: SLM 0 to 5.80 94202~|~1~|~2~|~02/SAF~|~Installation of flashing beacon by change order. 112745~|~1~|~1~|~01/MPO/MOGA~|~Resurfacing in the Village of Mogadore. 112745~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 110173~|~1~|~1~|~01/IMS~|~District Geological Site Management Allocation - 4SF7 (90% Federal) / 4SS7 (10% State) - See CAP Comment - Project for performing drainage work and slip repair along IR 70 embankment in MUS county. 116344~|~2~|~2~|~02/S>2~|~conduit linked 116344~|~1~|~1~|~01/NHS~|~CFN1844526 has been linked to NHS funding. 116344~|~3~|~3~|~03/STR~|~conduit 1864282 linked to stp rural plan split. 88882~|~1~|~1~|~01/S<2~|~District Allocation 96510~|~1~|~1~|~01/ENH~|~Safe Routes to School project. Add to existing walking path, install bike racks, install lighting along walking path and improve sight distance. Funded 100% federal. 109778~|~1~|~1~|~01/STR~|~AC overlay without repairs 109778~|~1~|~2~|~02/S>2~|~AC overlay without repairs 109778~|~1~|~3~|~03/NFA~|~Resurfacing - not on Federal Aid System 110498~|~1~|~1~|~01/STR~|~All work is in this plan split using district preservation allocations. 115287~|~1~|~1~|~01/NFA~|~created for J&C involvement 97362~|~1~|~1~|~01/NFP~|~Facility Renovation 118053~|~1~|~1~|~01/SAF~|~Road diet on Harrison Ave from Kling Ave to Queen City Blvd including traffic signal rebuilds, pedestrian enhancements and resurfacing. 118053~|~1~|~2~|~02/SAF~|~use for replacement of retaining wall along walk, and any other item not eligible for Safety funds 92071~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 2801809; GEA-422-1638 108456~|~1~|~1~|~01/NHS~|~NHS SR 25 from 22.523 to 22.602 108456~|~1~|~2~|~02/CMQ~|~CR-801 from 0.00 - 0.196 116575~|~1~|~1~|~01/NFA~|~Created for J&C involvement 123001~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties. 121936~|~1~|~1~|~01/NHS~|~Intersection improvements along US 62 at Beech Road and County Line Road intersections. 103177~|~1~|~1~|~01/S>2~|~The project will construct a protected bike lane or cycle track in the City of Dayton. 90216~|~1~|~1~|~01/NFP~|~Local Park Roads 107482~|~1~|~1~|~01/STR~|~AC Overlay with repairs 122902~|~1~|~1~|~01/IMS~|~work for the sewer trunk line 122902~|~1~|~2~|~02/NFA~|~This plan split represents MSD design work 91261~|~1~|~1~|~01/STR/Stat~|~On SR522, begin project 5.3 miles east of the Scioto County Line. It is proposed to repair the slip. Fed Dec. #OH11-02. 80%fed/20%state 113620~|~1~|~1~|~01/NFP~|~Created for J&C involvement 114270~|~1~|~1~|~01/SAF~|~Construction of a modern roundabout at the intersection of Millikin & Morris. 100462~|~1~|~1~|~01/STR~|~ROS 50 (11.27-16.85) 100462~|~1~|~4~|~04/S<2~|~ROS 50 19.26 7103301 100462~|~1~|~3~|~03/STR~|~ROS 50 11.83 7103182ROS 50 14.99 7103247ROS 50 16.47 7103271 100462~|~1~|~2~|~02/S<2~|~ROS 50 (16.85-19.31) 110574~|~1~|~1~|~01/STR~|~Culvert repair throughout the district. 93001~|~1~|~1~|~01/NFA~|~Major Rehabilitation Funds - 4MT7 (100% State) - No CAP - FDR (12") with related work on: SR 662 in Gue; Cos; Mus- counties at the associated locations. 93001~|~1~|~2~|~02/NFP~|~District Preservation Bridge Funds - 4PS7 (100% State) - No CAP - Deck Sealing with related work on: SR 662 in Gue; Cos; Mus- counties at the associated locations. 111950~|~1~|~1~|~01/S<2~|~2" Mill and Fill in the City of Urbana. 25349~|~1~|~1~|~01/S>2~|~Remove bridge No. HAM-264-1044 (SFN: 3111547), over abandoned RR. Reconstruct roadway on new embankment. 119818~|~1~|~1~|~01/NFA~|~Construct a multi-use trail from Alpha Rd. in Greenwich Twp. to Town Line 79 in New London Twp. also including trail surface improvement. 95635~|~1~|~1~|~01/IMS~|~LUC-75-3.01 bridge LUC-475-5.22 L&R Bridges LUC-246-5.84 Bridge 97724~|~1~|~1~|~01/IMS~|~Sporatic delamination correction on travel lanes on PRE-70 in both directions inthe travel lane only. The intent is to perform enough patching to hold the pavement until the FY2018 resurfacing project. 117174~|~1~|~1~|~01/IMS~|~Split for paving work 99564~|~1~|~2~|~02/NFP~|~This is for items not eligible for urban paving. 99564~|~1~|~1~|~01/S>2~|~WOO-65 from SLM 22.43 to SLM 24.53. This is for urban paving eligible items. 112625~|~1~|~1~|~01/S<2~|~Landslide repair from OH19-01 ER event. 90425~|~1~|~1~|~01/STR~|~Culvert Replacement 111530~|~1~|~1~|~01/MPO~|~TMACOG CMAQ funded items 120063~|~1~|~1~|~01/NFA~|~NEVI Round 2 270-A 92822~|~1~|~1~|~01/NHS~|~Pavement planing and resurffacing with asphalt concrete on AUG US 33 13.28 from SLM 13.28 (County Road 33 A) to SLM 16.53 (Bellefontaine Road) 108766~|~1~|~1~|~01/ERD~|~Pavement widening and resurfacing work eligible for the SAFETEA-LU (OH-86) earmark funding 116487~|~1~|~1~|~01/STR~|~Culvert Repair or Replacement 93711~|~1~|~1~|~01/SAF~|~Safe Routes to School project with Genoa TwpCrosswalks, Hawk Signal, School Zone Signs, Bike Racks 108509~|~1~|~1~|~01/STR/SAL~|~Landslide repair from OH18-01 ER Event. 119052~|~1~|~2~|~02/NHS~|~All work on bridges classified as being on the NHS included in this split. 119052~|~1~|~3~|~03/S5K~|~All work on bridges under the STP 5,000-49,999 classification. 119052~|~1~|~1~|~01/STR~|~All bridge work on rural classified bridges. SFN's 0200875 and 6302122. 122820~|~1~|~1~|~01/IMS~|~plan split for the bridge work 102478~|~1~|~2~|~02/STR~|~Resurfacing of TUS-93 and TUS-212 102478~|~1~|~3~|~03/SAF~|~Centerline rumble stripe items on US 250 and SR 21 102478~|~1~|~1~|~01/NHS~|~Resurfacing TUS-250, TUS-250I and TUS-21 102478~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 91829~|~1~|~1~|~01/ERD~|~100% federal earmark id OH062 using Toll Revenue Credit. 97909~|~1~|~1~|~01/ENH~|~US 35 from Edwin C. Moses Blvd to Wayne Ave - this project will replace existing high pressure sodium lights with LED lights and install sidewalk lighting at the Edwin C. Moses Blvd, Perry Street, Ludlow Street and Wayne Avenue underpasses of US 35. 117977~|~1~|~1~|~01/NFP~|~Plan split for bridge operations 90566~|~1~|~2~|~02/NHS~|~Retroreflective sign replacement on Federal Aid streets in the City of Marietta. NHS routes funded 80/20% federal/local. 90566~|~1~|~1~|~01/MPO~|~Retroreflective sign replacement on Federal Aid streets in the City of Marietta. Federal (MPO)/Local 80/20%. 123158~|~1~|~1~|~01/IMS~|~Resurface with Fine Graded Polymer Modified Asphalt 110853~|~1~|~1~|~01/SAF~|~Replace full access intersection with RCUT. 91413~|~1~|~1~|~01/BRO~|~Brdg replacement. 4402588 LAW SR141 16.18 Intersect: Long CreekWest of SR775 an SR141 intersection.80 Fed/20 State. 01/BRO/BR/State 93854~|~1~|~1~|~01/S>2~|~Raising roadway profile to correct drainage and flooding issues. Includes extensive earthwork. In the City of Streetsboro, Portage County, Ohio. 93854~|~1~|~2~|~02/S>2~|~Replacement of SFN# 6704352, POR-SR303-0.70 structure, in the City of Streetsboro, Portage County, Ohio. 93854~|~1~|~3~|~03/S>2~|~Reconstruction of railroad crossing on western edge of project. 94439~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement 111597~|~1~|~1~|~01/S<2~|~resurfacing. 100098~|~1~|~1~|~01/S>2~|~100% federal participation utilizing Toll Revenue Credit to repair and resurface East 93rd Street. 100098~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding. 123301~|~1~|~1~|~01/STR~|~Encase deteriorating piers on several bridges 87372~|~1~|~1~|~01/STR~|~Replace bridge with deficient deck and substructure with minimal approach work on SFN 7500904 SHE 48 0202 over Klase Ditch. 119940~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 104912~|~1~|~1~|~01/NFA~|~Black River Schools school bus replacement 110789~|~1~|~1~|~01/NFP~|~Landslide repair 121899~|~1~|~1~|~01/SAF~|~Construct sidewalk along SR-48. 121899~|~1~|~2~|~02/MPO~|~construction of sidewalk along Butterworth Road from SR48 to Dorsey Lane 119928~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT 95991~|~1~|~2~|~02/STR~|~Plan Split 02/STR/BR/ - District Bridge Preservation Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap 95991~|~1~|~1~|~01/STR~|~Plan Split "01/STP/PV/" - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - for Kno-36-(29.49-35.87). 106184~|~1~|~1~|~01/NFA~|~Metro Parks - site improvement to provide a driveway, parking lot and walking trail - Mad River Gorge. 80960~|~1~|~1~|~01/ERD~|~100% federal earmark id OH165 using Toll Revenue Credit. 103305~|~1~|~1~|~01/NFP~|~Split for pavement work 100216~|~1~|~1~|~01/NFA~|~TID is constructing the Eastgate South at Clepper Lane Roundabout Project 97425~|~1~|~1~|~01/STR~|~Plan split for culverts 102057~|~1~|~1~|~01/SAE~|~Funds in the Construction Contract subphase from the safety program. 90% federal funds 4HJ7 and 10% state funds SAC 4BC7. Funds in the Construction Engineering subphase are also 90% federal and 10% state but not from the safety program. 101851~|~1~|~1~|~01/IMS~|~Bridge repair project on various bidges within the district to include patching, rebuilding and sealing elements of the structures. 101851~|~1~|~2~|~02/NHS~|~Bridge repair project on various bidges within the district to include patching, rebuilding and sealing elements of the structures. 101851~|~1~|~3~|~03/S<2~|~Bridge repair project on various bidges within the district to include patching, rebuilding and sealing elements of the structures. 101579~|~1~|~1~|~01/S<2/JEFC~|~DSR# JEF-014 94340~|~1~|~1~|~01/STR~|~From SLM 5.03 to SLM 13.01 94340~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 109369~|~1~|~1~|~01/NFP~|~ODNR St. Mary's Fish Hatchery chip-seal resurfacing 95211~|~1~|~1~|~01/NHS~|~Landslide along SR 7 in Belmont county at the North end of Shadyside at the end of the on ramp from Shadyside. NHS route SLM 13.75 120680~|~1~|~1~|~01/SAF~|~added plan split 2 priority 1 114213~|~1~|~1~|~01/IMS~|~Recessed wet reflective PM 90259~|~1~|~3~|~03/NFP~|~This is for the section from SLM 2.22 to SLM 2.95 for all items not eligible for Urban Paving. 90259~|~1~|~1~|~01/SAF~|~A safety funded project to improve Byrne/Dorr/Secor intersections. 90259~|~1~|~2~|~02/S>2~|~This is for the urban paving of Dorr St from 2.22 (Secor) to 2.95 (Douglas). 95934~|~1~|~1~|~01/NFA~|~Canton City School District 88575~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing on SR 48 from 18.14 to 19.10. Poplar Street to the South Corporation Limit of Clayton. 110502~|~1~|~1~|~01/IMS~|~Split for bridge painting over the interstate 121138~|~1~|~1~|~01/STR~|~Resurfacing SR 152 from SLM 21.96 to SLM 25.84 121138~|~1~|~2~|~02/S5K~|~Resurfacing SR 152 from SLM 25.84 to SR 7 107290~|~1~|~2~|~02/NHS~|~Spot paving on FAY US 35 107290~|~1~|~3~|~03/IMS~|~Minor repairs on five structures 107290~|~1~|~1~|~01/IMS~|~Spot paving on FAY/MAD IR 71 108401~|~1~|~1~|~01/NHS~|~Landslide repair from OH18-01 ER event. 100882~|~1~|~1~|~01/CMQ~|~Reconfiguration of the existing SR-741 intersection with Kings Mill Road and Parkside Drive. SR-741 will become the through movement. The southwest approach of Kings Mill Road will intersect SR-741 at a signal controlled T-intersection. Parkside Drive will be cul-de-sac'ed west of the intersection. 92781~|~1~|~1~|~01/SAF~|~Guardrail upgrade/replacement project funded by CEAO. Various sections of CR 18, CR 20 and CR 33A in Meigs County. Funded 100% federal. 124789~|~1~|~1~|~01/SAF~|~Sign replacement 104000~|~1~|~1~|~01/BRO~|~Plan split for all bridge work 104000~|~1~|~2~|~02/NFP~|~Split for 100% local funding for items of work not eligible for federal participation. 104000~|~1~|~3~|~03/NFP~|~Plan split for Crown Castle utility relocation work 104000~|~1~|~4~|~04/NFP~|~Plan split for CenturyLink utility relocation work 104000~|~1~|~5~|~05/NFP~|~Plan split for Windstream utility relocation work 104000~|~1~|~6~|~06/NFP~|~Plan split for Charter utility relocation work 106293~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties. 108270~|~1~|~1~|~01/SAF~|~Intersection Improvement on NHS route in the City of Fairfield. 108270~|~1~|~2~|~02/SAF/FAIR~|~Covers 100% local cost (alternate bids for City preferences and paving of parking lot associated with an acquisition parcel). 116822~|~1~|~1~|~01/S>2~|~Resurfacing. 116822~|~1~|~2~|~02/STR~|~Resurfacing. 116822~|~1~|~3~|~03/STR~|~Minor bridge work. 104256~|~1~|~1~|~01/NFP~|~Mowing 87216~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" ? County Engineer?s Association Organization (CEAO) Bridge Program 4B87 (Federal 80%) / 4BG7(TRC 15% / Local 5%) ? CEAO CAP of $605,150.00 for Construction Phase ? Credit Bridge CAP of $74,205.00 - Bridge replacement of SFN #6032184 MUS CR45 01.80 Intersect: Manns Fork Salt Creek: BR Eligible for Replacement Length=53' SD/FO(1) SR=17.4 DSR=6; 122837~|~1~|~1~|~01/NFP~|~replacement of superstructure 113274~|~1~|~1~|~01/SAE~|~Pedestrian Safety Improvements at various locations in the City of Dayton. 100541~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads 123829~|~1~|~1~|~01/STR~|~Conduits FY31. 109713~|~1~|~1~|~01/STR~|~AC overlay without repairs Resurfacing of the Miami County Garage. 108380~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 513 0.75-0.79. NOB_NF_0002. Not on the federal aid system funded 100% ER funds. 108380~|~1~|~2~|~02/NFA~|~Resurfacing project using an asphalt overlay treatment. NOB 513 0.00-1.00. Funded 100% state. 97979~|~1~|~1~|~01/SAF~|~FY2020 District wide raised pavement markers. 94434~|~1~|~1~|~01/STR~|~Bridge - Major Rehabilitation 114405~|~1~|~1~|~01/NFP~|~Miscellaneous charges not attributable to a specific PID 100759~|~1~|~1~|~01/NHS~|~Resurfacing project on MOE SR 7 2.21-5.40 using an asphalt overlay with repairs treatment. NHS Federal 80% and State 20% funded. 14522~|~1~|~3~|~03/IMS~|~100% Local funding for signalization work.Phase C.Reference Items 54-55; 59-61; 63-64; 72.Local Sponsor - City of Columbus. 14522~|~1~|~2~|~02/S>2~|~100% STP funding for signalization work.Phase C.Reference Items 51-64; 72.Local Sponsor - City of Columbus 14522~|~1~|~1~|~01/CMQ~|~100% CMAQ funding for Signalization work,Phase C.Reference Items 1-50; 65-71; 73-102.Local Sponsor - Columbus 100834~|~1~|~1~|~01/IMS~|~Bridge maintenance 100834~|~1~|~2~|~02/S<2~|~Bridge Maintenance 114071~|~1~|~1~|~01/S>2~|~Bilstein Boulevard Bridge Rehabilitation 123754~|~1~|~1~|~01/IMS~|~Interstate plan split. 98112~|~1~|~1~|~01/BRF~|~Rehabilitation of the existing truss Bridge No. PRE-TR 333-0002 (SFN: 6831729), which carries Brower Road over Seven Mile Creek, including repairs and/or replacement of substructure, superstructure, and deck components 87261~|~1~|~1~|~01/NHS~|~Concrete pavement repair project. ATH US 33 17.99-26.71. NHS route funded 80 federal/20 state. 116445~|~1~|~1~|~01/NHS~|~Districtwide signal repair/maintenance. 108825~|~1~|~1~|~01/S<2~|~"01/S<2/OT " - 60% Federal (4PF7) and 40% State (4PS7) - construction engineering costs. 102420~|~1~|~1~|~01/NHS~|~MAH SR 616 from 4.89 to 5.41. 102420~|~1~|~2~|~02/NHS~|~MAH SR 616 from 5.41 to 8.88 Northbound. 102420~|~1~|~3~|~03/NHS/YOUN~|~MAH SR 616 from 5.41 to 8.88 Southbound. Urban Paving within the City of Youngstown. 103273~|~1~|~1~|~01/MPO~|~Resurfacing of Lower Bellbrook Avenue from Colorado Drive to Maumee Drive including replacement of deteriorating curb and curb inlets. 99924~|~1~|~1~|~01/BRO~|~CEAO funded bridge rehab of Campbell Rd over Columbia St Ditch 122177~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-70-B 123640~|~1~|~1~|~01/NFP~|~Plan split for repair, replacement or maintenance of state-owned traffic signals. 87145~|~1~|~1~|~01/NHS~|~Joint repair and diamond grinding on MOT US 35 10.32 to 13.85 (Dayton) from the Junction of SR 49 to Dearborn/Abbey Avenue. 124825~|~1~|~1~|~01/NFA~|~Bridge replacement project. VIN TR 34J 1.50, SFN 8233756. 112550~|~1~|~1~|~01/IMS~|~Plan split to program project. Update as part of Plan Split Review process at plan file. 111624~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit counties. 122783~|~1~|~1~|~01/SAF~|~Intersection safety 105333~|~1~|~1~|~01/NHS~|~Highway Lighting on Roadway classifications starting with "N" 105333~|~1~|~2~|~02/IMS~|~Interstates not in Cities. All Roadway classifications starting with and "I". 108510~|~1~|~1~|~01/NHS~|~Repair structures JEF-7-3346 (SFN 4101626) and JEF-7-3380 (SFN 4101650) by removing the existing wearing surfaces and placing new rigid overlays. The project will also replace approach slabs, expansion joints and backwalls. 108510~|~1~|~2~|~02/NHS~|~Mine grouting under JEF-7-33.80 pier. 86641~|~1~|~2~|~02/S<2~|~Marion urban area and general paving (D6 federal/D6 state)SR-309: 18.88-20.26Asphalt OL on SFN 5101735, MAR-309-19.02 over Grave Ck02/S<2/PV/F_ST 86641~|~1~|~4~|~04/S<2~|~80% Marion Large City funds and 20% local funds for pvmt repair and curb ramps within city of Marion04/S<2/PV/LGLC 86641~|~1~|~1~|~01/S<2~|~Marion urban area and City o Marion urban paving (D6 fed/local)SR-309: 17.57-18.88SR-4D: 1.03-1.1901/S<2/PV/F_LC 86641~|~1~|~3~|~03/STR~|~Rural func class area and general system paving (D6 federal/D6 state)SR-309: 20.26-22.52Asphalt OL on SFN 5101751, MAR-309-21.80 over Fooscroft Ditch03/STR/PV/F_ST 119354~|~1~|~1~|~01/S>2~|~Resurfacing 110251~|~1~|~1~|~01/NFA~|~Slide repair between C.R. 427A and S.R. 7 99297~|~1~|~1~|~01/BRO~|~Work related to overlay and repair of SR53 structure over US23. Includes slope flattening and guardrail replacement between the ramps at the interchange. 91047~|~1~|~1~|~01/MPO~|~Resurfacing 91047~|~1~|~2~|~02/S<2~|~100% Local CE, over NOACA cap, per R. Lane on 12/18/13. 102577~|~1~|~1~|~01/STR~|~Bridge replacement on MAD-62-2.80 89160~|~1~|~1~|~01/BRF~|~"01/BRF/BR/ " - County Engineer's Association Funding 4B87(80% Federal) / LNTP(20% Local) - CAP = $424,800.00 Federal dollars - Replacement of 6046142 MUS CR40 3.11 Intersect: Symmes Creek; BR Eligible for Replacement: Length=31 SD/FO(1) SR=18.8 DSR=4 112932~|~1~|~1~|~01/NHS~|~NHS Plan Split: FRA-104-104-8.18-12.98 112648~|~1~|~1~|~01/NFP~|~This is the district's systematic RPM replacement maintenance contract of prismatic reflectors that have lost reflectivity or are in need of replacement. 97628~|~1~|~1~|~01/STR~|~Emergency Type B pavement repair. MOE 26 5.59-14.68, MOE 379 4.57-6.05, MOE 536 2.42-5.00, NOB 146 8.50-17.87, NOB 147 3.50-16.95, NOB 285 0.24-4.90, 5.55-14.47, and NOB 566 0.00-1.59. Rural other federal aid funded 100% state. 97628~|~1~|~2~|~02/NFA~|~Emergency Type B pavement repair. MOE 379 0.00-4.57, 6.05-8.07, MOE 724 0.00-1.30, NOB 260 3.75-14.35, NOB 513 0.42-9.18, NOB 566 1.59-4.80, and NOB 724 0.00-2.75. Not on the federal aid system funded 100% state. 110928~|~1~|~1~|~01/SAF~|~Construction of sidewalk on the south side of E. Baldwin Street from N. Broadway Street to N. Columbus Street. Application of crosswalks and installation of signage. 122195~|~1~|~1~|~01/SAF~|~Sidewalk and pedestrian project in Jackson. 81662~|~1~|~1~|~01/S>2~|~Resurfacing work on US 22 in the Village of Silverton. Will include minor curb repair, curb ramps, pavement repari, planing, and resurfacing. 95677~|~1~|~1~|~01/S>2~|~Indiana Ave from I-75 to Washington St 102926~|~1~|~1~|~01/NHS~|~NHS bridge 102926~|~2~|~2~|~02/STR~|~STP Rural bridge. 91266~|~1~|~1~|~01/STR~|~On SR522, begin project 0.39 mile west of SR93. It is proposed to repair the slip. Fed Dec. #OH11-02. 80%fed/20%state 95547~|~1~|~2~|~02/SAF/NEWA~|~"02/SAF/OT/NEWA" - Local Safety Project 4HJ7 (Federal 90%) / 4BG7 (Local 10%) - Project CAP $75,000.00 Federal Funds requiring a 10% Local Match - OFAH/Urban Signal Upgrade at: Location 2 Lic-CR 132-1.88 (West Main Street) at 30th Street (CR 802); This is the second priority for funding. 95547~|~1~|~1~|~01/SAF/NEWA~|~"01/SAF/OT/NEWA" - Local Safety Project 4HJ7 (Federal 90%) / 4BG7 (Local 10%) - Project CAP $75,000.00 Federal Funds requiring a 10% Local Match - NHS Signal Upgrade at: Location 1 Lic-SR 16-23.74 at Dayton Road (CR 260); This is the first priority for the CAP Priority 108894~|~1~|~1~|~01/STR~|~LOR-83-0.00 to 2.61 MED-83-4.26 to 12.77 108894~|~1~|~2~|~02/SAF~|~Microsurfacing various intersections on LOR-57/20 105388~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: CHP US 36 SLM 22.33 to 29.05 108006~|~1~|~1~|~01/NFP~|~District 3 is paying for Plan Split 1 Costs. ERI SR 0002-Lighting Upgrades and MED SR 0057 Light relocations. 108006~|~1~|~2~|~02/NFP~|~District 2 is paying for Plan Split 2 Costs. OTT-SR-002 27.00-27.78- 42 Mongoose LED lights, 16 conventual LED lights 104788~|~1~|~1~|~01/BRO~|~Replacement of the Brighton Approach Bridge over Central Parkway (SFN: 3101533) in Cincinnati, OH. 124421~|~1~|~1~|~01/STR~|~Intersection improvement 117672~|~1~|~1~|~01/NFA~|~Created for J&C involvement 114712~|~1~|~1~|~01/NFA~|~Detailed plan splits will be addressed during detail design. 92604~|~1~|~1~|~01/NHS~|~Microsurface US 33 in Auglaize County:AUG US 33 SLM 16.92 to 23.07 107284~|~1~|~1~|~01/NFA~|~ODNR Bridge project in Shawnee State Forest 93037~|~1~|~3~|~03/S<2/LANC~|~District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving Resurfacing on Fai-SR 188-11.45 to 12.85 93037~|~1~|~4~|~04/SAE/LANC~|~Safety Funding - No CAP - 100% Safety (4HJ7) - replacement of signal poles and mast arms at intersection of US 22 and Memorial Drive. 93037~|~1~|~5~|~05/S<2~|~Local Funding - No CAP - 80% Federal (4TA7)/20% Local (4BG7) - replacement and upgrade of signal equipment at the intersections of SR 188/US 22, US 22/Zane Avenue, and SR 188/Pierce Avenue. Work will also include drainage and curb work on SR 188. 93037~|~1~|~1~|~01/NFA~|~District Preservation 7BPB/4PS7(100% State) - CAP (See CAP Comments) - Resurfacing with related work on Fai-SR 188-00.00 to 08.73 93037~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-SR 188-08.72 to 11.45 93037~|~1~|~6~|~06/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - berming operation with related work on Fai-SR 159-0.00 to 6.75 100831~|~1~|~1~|~01/STR~|~Rehab Bridge CLI SR 380 8.27 over Buck Run by painting the exisiting weathering steel and overlay the deck. 119143~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 13.98-19.11. 119143~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 13.98-19.11. Work on the existing lanes. 109333~|~1~|~1~|~01/NFP~|~ODNR culvert lining project at Kiser Lake State Park 114877~|~1~|~1~|~01/S>2~|~STP>2 plan split. 87259~|~1~|~1~|~01/STR~|~SCO SR348 0.00 - 6.23 Resurfacing Project On SR348, begin project at the Adams County line (SLM 0.00) and terminate ar SR73 (SLM 6.23). It is proposed to resurface the roadway with asphalt concrete.Pave Thru Brdgs: 7305303 SCI SR348 0.29 Intersect: Liston Run 7305346 SCI SR348 2.57 Intersect: Br Of South Fork 7305389 SCI SR348 3.28 Intersect: Adkins Run 7305397 SCI SR348 4.02 Intersect: Canada Run80/20 split01/STR/PV/State 87259~|~1~|~2~|~02/STR~|~SCI SR348 0.00 - 6.23 Resurfacing ProjectBegin at the Admas County line and terminate at SR73 Brdgs for rehab:7305338 SCI SR348 1.81 Intersect: Beech Creek7305435 SCI SR348 6.01 Intersect: N Fork Scioto Brush Crk80/20 split02/STR/BR/State 95706~|~1~|~1~|~01/SAF~|~Safety/local funding to extend Gemini Pkwy from I-71 to worthington Rd 95706~|~1~|~2~|~02/SAF~|~Items not eligible for safety funding 121325~|~1~|~1~|~01/NHS~|~NHS plan split. 108011~|~1~|~1~|~01/NHS~|~Lighting 84860~|~1~|~1~|~01/BRF~|~"01/BRF/BR/HOL" - CR 22 8.61, located 0.65 mi E SR 3; replace bridge over Lake Fork of Mohican River; minor relocation to improve horizontal curvature. 98338~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail Upgrade on OFAH-Rural: Cos - SR 79 110913~|~1~|~1~|~01/NFP~|~Creating Plan split for J&C Involvement 123204~|~1~|~1~|~01/NFP~|~All work included in this plan split. 102471~|~1~|~1~|~01/STR~|~Minor Rehab of COL-45 from SLM 22.04 to 22.13 102471~|~1~|~2~|~02/S<2~|~Minor Rehab of COL-45 from SLM 22.13 to 23.29 102471~|~1~|~3~|~03/NHS~|~Minor Rehab of COL-45 from SLM 23.29 to 26.91 121079~|~1~|~1~|~01/STR~|~STP Rural Plan Split 121079~|~1~|~2~|~02/S5K~|~STP 5000 Plan split 116273~|~1~|~1~|~01/NFP~|~Created of J&C involvement 111322~|~1~|~1~|~01/SAE~|~Guardrail project on various routes in Ross County. 100509~|~1~|~1~|~01/STR~|~Resurfacing of CAR-9 and CAR-43 116450~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 800 over Stillwater Creek. Scour protection will be added, in stream work will be required. 106725~|~1~|~1~|~01/STR~|~Resurfacing SR 799 from SR 800 to CR 21. 116446~|~1~|~1~|~01/NFP~|~Districtwide systematic signing upgrades/replacements. 122303~|~1~|~1~|~01/STR~|~Landslide repair. 106368~|~1~|~1~|~01/STR~|~Bridge rehab on rural bridges. 102456~|~1~|~2~|~02/NFA~|~Asphalt Resurfacing of the ODNR Barnesville Office parking lot. 102456~|~1~|~1~|~01/IMS~|~Asphalt resurfacing of IR 70 from the 0.00 to 5.04 87904~|~1~|~1~|~01/IMS~|~Split for median barrier replacement 117553~|~1~|~1~|~01/NFA/JACK~|~Add sidewalks. 109772~|~1~|~1~|~01/STR~|~AC overlay 75316~|~1~|~3~|~03/IMS~|~1203576 CLA-70-0156 work includes some structure removed, joint seal replacememt, and some patching concrete structure.1203630 CLA-70-0173 work includes patching the concrete structure.1203754 CLA-70-0265 work includes some structure removed, surface course, joint seal replacement, and patching concrete surface.1206567 CLA-70-0310 and SFN 1206575 CLA-70-0312 work includes wearing course removed, surface course and joint seal replacement.1206478 & 1206451 CLA-675-0061 L/R work includes portion of structure removed, patching concrete structure and polymer modified asphalt expansion joint system. 75316~|~1~|~1~|~01/IMS~|~Planing and resurfacing of the existing roadway and other roadway related items on CLA IR 70 from SLM 0.50 to 6.28 (segment length 5.78 total lane miles 33.02) and on CLA IR 675 from SLM 0.00 to 1.60 (segment length 1.60 total lane miles 5.00). Minimal bridge work (Patching concrete structure as well as deep joint sealer) on SFN 1206567 CLA 70 3.10 and SFN 1206575 CLA 3.12. 75316~|~1~|~2~|~02/IMS~|~Pavement markings and RPM removal and replacement on; CLA -IR -70 1.050 to 6.280 CLA -IR -675 0.000 to 1.600 CLA -IR -70 0.500 to 1.050 FR 0.51 MI E OF THE CLA/MOT CL TO THE SRAN INTERCHANGE; FR THE GRE/CLA CL TO THE JCT IR70. 75316~|~1~|~4~|~04/STR~|~SFN 1252305 (OC 000) CLA-CR335-0027 (CLA-675-0160)-work includes wearing course removed surface course and joint seal repair. 87724~|~1~|~1~|~01/NHS~|~Concrete Joint and Slab Repairs CRA-30-0.00 to 4.07. Bridge Maintenance included. 87724~|~1~|~2~|~02/BRO~|~Bridge work. 105259~|~1~|~1~|~01/STR~|~Resurfacing SR 39 123603~|~1~|~1~|~01/NHS~|~Rehabilitation of culverts in D5. 115688~|~1~|~1~|~01/IMS~|~Split for interstate resurfacing 115688~|~1~|~2~|~02/NHS~|~Split for SR-2 resurfacing 111485~|~1~|~1~|~01/SAF/HAS~|~Pavement marking on various county routes with 100% 4HB7 CEAO Safety funds 81942~|~1~|~1~|~01/STR~|~Bridge Replacement 107956~|~1~|~1~|~01/NHS~|~HEN-6; HEN-24 89055~|~1~|~1~|~01/NFA~|~Reconstruction of proposed 2 lane section with C&G on both sides and on street parking on both sides. Lane widths will be 12' with 8' parking lanes on each side of the street on East Auglaize Street from Wood Street (SR 67) west to Broadway Street at the RR tracks. 89055~|~1~|~2~|~02/ENH~|~8' sidewalk consisting of 5' concrete and 3' bridge will be instlled on both sides of the street. Driveway approaches will be reconstructed. Project also includes water main replacement and upgrade to 12" plastic on East Auglaize Street from Wood Street West to Broadway Street at the railroad tracks. 119579~|~1~|~1~|~01/NFA~|~added plan split. 76377~|~1~|~2~|~02/NHS~|~Bridge work on 4 structures (not BR eligible):5100577 MAR US23 7.86 Intersect: Over Sr529-02795100607 MAR US23 7.86 Intersect: Over Sr529-02815100666 MAR US23 10.06 Intersect: Over 95 17895100690 MAR US23 10.06 Intersect: Over 95 1791 76377~|~1~|~1~|~01/NHS~|~Priority system paving of MAR-23: 2.42-10.63 76377~|~1~|~3~|~03/BRO~|~BR eligible bridge work on 2 structures:5100518 MAR US23 7.65 Intersect: Grave Creek5100542 MAR US23 7.65 Intersect: Grave Creek 112951~|~1~|~1~|~01/NFP~|~Guardrail Maintenance 112951~|~1~|~2~|~02/SAF~|~Guardrail replacement within the Village of New Alexandria 96644~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. MRG 266 0.00-7.62, 8.97-13.86. Rural other federal aid funded 80 federal/20 state. 100310~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay of TRU SR 45 from 12.90 to 13.39. 100310~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay of TRU SR 45 from 13.39 to 13.55. 100310~|~1~|~3~|~03/STR~|~Fine graded polymer AC Overlay of TRU SR 45 from 13.55 to 21.14. 106355~|~1~|~1~|~01/S<2~|~Culvert Replacement 93229~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 4306317; LAK-608-0337 114950~|~1~|~1~|~01/STR~|~Bridge Replacement. 115138~|~1~|~1~|~01/STR~|~Repair or Replace culverts 115138~|~1~|~2~|~02/NFA~|~Repair or Replace culverts 101972~|~1~|~1~|~01/BRO~|~This split covers work on the two overhead structures. 101972~|~2~|~2~|~02/IMS~|~Plan split to cover bridge hit damage repair activities only. 107547~|~1~|~1~|~01/S<2~|~Resurfacing COL-517 from SR 164 to SLM 2.20 107547~|~1~|~2~|~02/STR~|~Resurfacing COL-517 from SLM 2.20 to SR 7 92478~|~1~|~1~|~01/IMS~|~Construct a Type II noise wall on west side of I-270 from West Broad St north to RR tracks SLM 7.04-7.81 109399~|~1~|~1~|~01/IMS~|~Installation of partial tower lighting at IR90 and SR7 interchange in Ashtabula County. 107148~|~1~|~2~|~02/BRF~|~Plans Split for Yarrow St Bridge 107148~|~1~|~1~|~01/BRO~|~Plan Split for Seaman Rd roadway and bridge items 76382~|~1~|~3~|~03/NHS~|~4 NHS structures (not BR eligible):2101084 DEL US36 15.05 Intersect: Big Run2101092 DEL US36 15.05 Intersect: Big Run2101114 DEL US36 16.74 Intersect: Alum Creek2101122 DEL US36 16.74 Intersect: Alum Creek 76382~|~1~|~2~|~02/STR~|~Non NHS (STP) resurfacing portion of DEL-36: SLM 18.45-28.61 76382~|~1~|~1~|~01/NHS~|~DEL-36 resurfacing on NHS portion - SLM 12.83-17.64 76357~|~1~|~3~|~03/NHS~|~D6 NHS 80/20 fed/state funding for minor work on 9 bridges:2508737 FRA-104-8.182508761 FRA-104-8.522508796 FRA-104-9.292508826 FRA-104-9.422508893 FRA-104-10.582508907 FRA-104-11.092508982 FRA-104-11.54L2508974 FRA-104-11.54R2508931 FRA-104.12.77 76357~|~1~|~2~|~02/NHS~|~D6 Fed/state funding for minor rehabFRA-104: 8.02-13.17 76357~|~1~|~4~|~04/NHS~|~Pavement Markings & RPMs 100% State 76357~|~1~|~1~|~01/S>2~|~STP Pavement 80/20 fed/stateFRA-104-7.96-8.02 95863~|~1~|~1~|~01/NFP~|~@ SLM 4.16, 5.67, 6.50, 8.46 and 9.15 98420~|~1~|~2~|~02/NHS~|~HUR-224-0.00-4.6 Resurfacing 98420~|~1~|~1~|~01/STR~|~HUR-224-0.00-4.6 Resurfacing 107149~|~1~|~1~|~01/BRF~|~bridge split 95761~|~1~|~1~|~01/STR~|~OTT-163 from SLM 4.05 to 10.00 95761~|~1~|~2~|~02/NHS~|~WOO-23 from SLM 17.70 to 21.05 112659~|~1~|~1~|~01/MPO~|~Split for MPO-funded eligible work 118436~|~1~|~1~|~01/STR~|~Rehabilitation of LIC-37-18.94 (SFN 4501810) 120191~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in construction & inspection 98993~|~1~|~1~|~01/NHS~|~Miami 98993~|~1~|~2~|~02/S>2~|~non NHS route 88675~|~1~|~4~|~04/NHS/MED~|~Resurfacing - NHS Segment - MED-042-17.05 - 17.68 88675~|~1~|~1~|~01/S<2/MED~|~Urban paving - 80/20 - District Allocation/City of Medina 88675~|~1~|~3~|~03/S<2~|~District Allocation 80/20 Fed/State 88675~|~1~|~2~|~02/S<2/MED~|~100% City of Medina 96585~|~1~|~1~|~01/NHS~|~101 G microsurfacing purchase order contract. GAL 35 6.70-7.40. NHS route funded 100% state. 123245~|~1~|~1~|~01/S5K~|~Crack Seal. 94957~|~1~|~1~|~01/NHS~|~SFN 7403011 122151~|~1~|~1~|~01/BRO~|~Partial bridge removal. 116236~|~1~|~1~|~01/S<2~|~Overlay project in LAW. 116236~|~1~|~2~|~02/NHS~|~Added plan split. 116236~|~1~|~4~|~04/NHS~|~added plan split. 116236~|~1~|~3~|~03/S>2~|~Added plan split. 95880~|~1~|~1~|~01/NHS~|~The project is for replacement of Bridge HAS-250-0543 (SFN 3401596). 112293~|~1~|~1~|~01/STR~|~Bridge Repairs 112293~|~1~|~2~|~02/S5K~|~Bridge Rehab 112293~|~1~|~3~|~03/NHS~|~Add new VPF to McElroy Rd bridge over US 30 109803~|~1~|~1~|~01/STR~|~Resurfacing on SR 65 in Allen County from the Auglaize County line at SLM 0.00 to the Lima Urbanized Boundary at Breese Road which is at SLM 3.06. District preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds. 109803~|~1~|~2~|~02/S50~|~Resurfacing on SR 65 in Allen County in the Lima Urbanized Area but outside of the City of Lima. On both sides of the SR 65 from the Lima Urbanized Boundary at Breese Road which is at SLM 3.06 to where SR 65 enters the City of Lima on the left side at SLM 3.09, then on the right side until the beginning of the concrete pavement at SLM 3.63 and then on the right side of SR 65 from where it exits the City of Lima on the right side at SLM 4.06 until SR 65 leaves the City of Lima on the left side at SLM 4.56 then on both sides of the road until SR 65 enters the City of Lima at SLM 5.06 where the project ends. District preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds. 109803~|~1~|~3~|~03/S50/LIMA~|~Resurfacing on SR 65 in Allen County inside of the City of Lima. On the left side of SR 65 from where SR 65 enters the City of Lima at SLM 3.09 until the beginning of the concrete pavement at SLM 3.63 and then on both sides of the road from the end of the concrete pavement at SLM 3.94 until SR 65 leaves the City of Lima on the right side at 4.06 and then on the left side of SR 65 until SR 65 leaves the City of Lima at 4.56. District preservation funds (4PF7 - 80% and local funds from the City of Lima 4BG7 - 20%). 109803~|~1~|~4~|~04/NFP/LIMA~|~100% city costs. 109803~|~1~|~5~|~05/SAE~|~Adding both centerline and edge line rumble strips from SLM 0.00 to 3.00. Funded 100% with safety funds. 114003~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads in Warren County. 95748~|~1~|~1~|~01/NHS~|~LUC-5 from SLM 10.33 to SLM 12.11 109777~|~1~|~1~|~01/S>2~|~AC overlay without repairs 109777~|~1~|~2~|~02/STR~|~AC overlay without repairs 94564~|~1~|~1~|~01/SAF~|~Construct a left turn lane for south bound and north bound traffic on US 68 at the intersection of US 68 and Hickory Grove. 93671~|~1~|~1~|~01/STR~|~District Wide Pavement Marking 102536~|~1~|~2~|~02/STR~|~This split is for the rural section of the State Routes on this project. 102536~|~1~|~3~|~03/NHS~|~This plan split is for NHS route of the project. 102536~|~1~|~1~|~01/S>2~|~Microsurfacing on minor arterial routes. 102536~|~1~|~4~|~04/S<2~|~This plan split is for the small urban route. 107527~|~1~|~1~|~01/NFA~|~Resurfacing HOL-643 from SLM 0.00 to 4.12 107527~|~1~|~2~|~02/STR~|~Resurfacing HOL-643 from SLM 4.12 to SLM 5.44 117991~|~1~|~1~|~01/BRF/PCEO~|~Replacement of bridge at PER TR 1180 0.10 124023~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs HUR-99-14.959 to 17.831 including bridge maintenance 124023~|~1~|~2~|~02/S5K~|~Concrete Pavement Repair ERI-113-6.629 to 6.849Asphalt Concrete Overlay with Repair HUR-99-14.951 to 14.959 82941~|~1~|~1~|~01/IMS~|~Plan Split for SFN 5006511 MAH IR 680 0282 Bridge under Vestal Rd CR-522. 94284~|~1~|~1~|~01/S<2~|~Bridge Accident Damage Repair - District Allocation 117620~|~1~|~1~|~01/NFP~|~Lighting upgrades/replacements. 124351~|~1~|~1~|~01/IMS~|~Plan Split for widening bridge 92892~|~1~|~1~|~01/S<2~|~District Allocation SLM 16.04-16.30 (Split) 92892~|~1~|~2~|~02/S<2~|~Urban paving - 80/20 - District Allocation/City of WoosterSLM 14.64-15.74 (Full)SLM 16.04-16.30 (Split) 92892~|~1~|~3~|~03/S<2~|~100% City of WoosterSLM 14.64-15.74 (Full)SLM 16.04-16.30 (Split) 116782~|~1~|~1~|~01/STR~|~WAY SR 0003 (04.62) (08.55) 116782~|~1~|~2~|~02/S5K~|~WAY SR 0003 (08.96) & (11.61). 85634~|~1~|~1~|~01/NHS~|~80/20 fed/state split for all work using federal NH funds. 98807~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for eligible resurfacing work items. 94112~|~1~|~1~|~01/S<2~|~Resurfacing ATB SR 534 from 25.26 to 26.15 94112~|~1~|~2~|~02/S<2~|~Minor bridge work > 20' span. 107988~|~1~|~1~|~01/NFP~|~Craig and Port Clinton lift bridges. 96961~|~1~|~1~|~01/STR/LAW~|~It is proposed to replace an entire structure on SR 141, 0.15 miles west of SR 378. 107296~|~1~|~1~|~01/CMQ~|~Upgrades to 14 existing signalized intersections in the City of Mt. Healthy along Compton Road and Hamilton Avenue (US-127). 107296~|~1~|~2~|~02/CMQ~|~Plan split for 100% City cost for work on unwarranted signals. 101745~|~1~|~1~|~01/STR~|~Landslide repair, DSR# CAR-002 91602~|~1~|~1~|~01/STR~|~Brdg Replacement. Located 2.02 miles south of Highland County Line on SR 41. 0103543 ADA SR136 23.05 Intersect: Trib Of W Fk Ohio Brush80 Fed/20 State.01/STR/BR/State 94337~|~1~|~1~|~01/BRO~|~Plan split for bridge repair work. 4306384 103630~|~1~|~1~|~01/S<2~|~DSR BEL-014 121704~|~1~|~1~|~01/IMS~|~Work to improve drainage and repair wall damage from excessive drainage. 114569~|~1~|~1~|~01/IMS~|~Fine Graded Polymer Modified Asphalt Concrete mill/fill 92810~|~1~|~1~|~01/BRO~|~Bridge replacement project. MOE 7 9.58, SFN 5600332. BR eligible funded 80 federal/20 state. 105373~|~1~|~1~|~01/ENH~|~Adding bike lanes on Wooster Ave in the City of Barberton. 105373~|~1~|~2~|~02/MPO~|~Resurfacing of 2nd St SW. 98834~|~1~|~1~|~01/IMS~|~Split for mowing 103758~|~1~|~1~|~01/BRF~|~Bridge Split 103758~|~1~|~2~|~02/NFA~|~Plan split for Waterline Work across bridge - 100% City of Toledo Funds 105152~|~1~|~1~|~01/BRO~|~All work in the project. All funds from the District Preservation Program budget. No local funds. 96943~|~1~|~1~|~01/NFP~|~Task order soil and compaction testing 94082~|~1~|~1~|~01/IMS~|~Plan split for lighting work on the interstate system. 112989~|~1~|~1~|~01/BRO~|~Split for bridge rehabilitation work. 95272~|~1~|~1~|~01/SAF~|~Upgrade signal to mast arms to support blank out signs in conjunction with railroad pre-emption. 95272~|~1~|~2~|~02/SAF~|~Improve radius to provide for truck turning from southbound Kauffman to Dayton Yellow Springs. 112035~|~1~|~1~|~01/NHS~|~Improve intersection of US 33 and Hayden Run Rd (CR32) 86595~|~1~|~1~|~01/STR~|~Brdg Rehab. 0803693 BRO SR505 6.48 Intersect: Trib Of Mid Br Bullskin0.24 mile south of intersection with SR756.80 Fed/20 State. BR funding eligible but only for rehab, not replacement. 01/STR/BR/State 102859~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% State funds from the District Preservation Program budget SAC 4PS7. 99419~|~1~|~1~|~01/SAF~|~Safety funded intersection project 102385~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement project for FY2022. Funded 80 federal/20 state. 102385~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement project for FY2022. 102385~|~1~|~3~|~03/NHS~|~Guardrail upgrade/replacement project for FY2022. 84614~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 350 in Warren County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 91972~|~1~|~1~|~01/BRO/CANT~|~Removal of SFN 7660898 Third Street Bridge over East Branch of Nimishillen Creek 91972~|~1~|~3~|~03/BRO/CANT~|~100% City of Canton items. 91972~|~1~|~2~|~02/BRO/CANT~|~Rehab of SFN 7660898 Third Street Bridge over East Branch of Nimishillen Creek. 110564~|~1~|~1~|~01/IMS~|~Rehabilitate Bridge HAM-275-3148 (Hopewell Rd over I-275) by replacing the barriers, adding a sidewalk, and replacing thte wingwalls. 114184~|~1~|~1~|~01/STR~|~Culvert replacement. 123649~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. 116855~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction costs 110792~|~1~|~1~|~01/NFP~|~Landslide repair 110792~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 101981~|~1~|~1~|~01/NFP~|~Guardrail maintenance and repair on various routes throughout District Four. 95424~|~1~|~5~|~05/S<2~|~PIK 551 0.27 (CFN 665510027) 95424~|~1~|~1~|~01/S<2~|~LAW 775 2.51 (SFN 4404424) 95424~|~1~|~2~|~02/NFA~|~BRO 221 3.79 (SFN 0802859) 95424~|~1~|~3~|~03/STR~|~BRO 68 24.58 (CFN 080682399) 95424~|~1~|~4~|~04/NHS~|~BRO 32 14.83 (CFN 080321457)BRO 32 15.47 (CFN 080321525) 94475~|~1~|~1~|~01/STR~|~Drainage repair project. NOB 78 7.28-7.30. Emergency B project funded 100% state. 117080~|~1~|~1~|~01/SAF~|~Pavement Marking 95548~|~1~|~1~|~01/ERD~|~100% federal participation using OH-216 earmark and TRC for Tiedeman Road improvements. This is the local portion of a larger project to mitigate traffice congestion at the IR-480 and Tiedeman Road interchange area. See also PIDs 80970 and 94723. 93955~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2018. Various routes and sections in D10. Funded 100% state. 93429~|~1~|~1~|~01/NHS~|~priority system minor rehab. of HAS-22-21.68 to 25.23; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking 109792~|~1~|~1~|~01/STR~|~Double Microsurface 109792~|~1~|~2~|~02/S>2~|~Double Microsurface 100215~|~1~|~1~|~01/STR~|~Installation of plug pile wall to stabilize slide area. 119735~|~1~|~1~|~01/BRF/LEB~|~Replacement of the Kingsview Drive bridge (SFN 8360235) in the City of Lebanon. 119273~|~1~|~1~|~01/BRF~|~Replace deck on structure over the Olentangy River 93862~|~1~|~1~|~01/BRF~|~Plan split 1 added for LBR funded work. Local-let by Franklin County Engineer. 105394~|~1~|~1~|~01/NHS~|~Bridge repair on NHS bridge. 96073~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - plan split for construction of Salt storage building at the proposed Crooksville OP in Perry County. 92987~|~1~|~2~|~02/NFA~|~District Preservation 7BPB/4PS7(100% State) - CAP of $3,675,627.76 7BPB Funding - Resurfacing with related work on: 1) Cos-SR 621-00.00 to 05.98; 2) Cos-SR 643-00.00 to 10.87; 92987~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Cos-SR 651-00.00 to 02.84; 2) Cos-SR 651-02.84 to 03.04; 3) Hol-SR 651-00.00 to 00.50; 4) Tus-SR 651-00.00 to 00.45; 88495~|~1~|~1~|~01/S<2/BG~|~SR-64 from SLM 4.12 to SLM 4.26 urban in City of Bowling Green. 88495~|~2~|~2~|~02/STR~|~SR-64 from SLM 4.26 to SLM 9.15 in Wood County. 113168~|~1~|~1~|~01/MPO~|~Resurfacing of West Steels Corners Rd from Akron Peninsula Rd to Northampton Rd in the City of Cuyahoga Falls. 117993~|~1~|~1~|~01/BRO~|~Bridge replacement. All work is included in this plan split. 94436~|~1~|~1~|~01/STR~|~Bridge Rehabilitation 96867~|~1~|~1~|~01/STR~|~Work funded with Federal rural STP funds from the County Engineers Association of Ohio (CEAO) budget. The 20% non-Federal match is provided by the Defiance County Engineers office. 101646~|~1~|~1~|~01/NHS~|~Culvert Replacements: WAY-250-28.89 109196~|~1~|~1~|~01/S<2~|~resurface Starr Ave SLM 1.64 to 3.54 119041~|~1~|~1~|~01/IMS~|~Placeholder plan split until locations are selected. 124803~|~1~|~1~|~01/BRO~|~Maintain bridge carrying SR 164 over Yellow Creek by repairing and protecting pier piling. 101730~|~1~|~1~|~01/BRO/MCEO~|~Muskingum County Engineer CEAO LBR Funding - 4B87 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of SFN 60313077 MUS-CR66A Intersecting Muskingum River- Length= 688' Width 24' / SD/FO=2 / SR=17.0 / DSR=3 101730~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 105030~|~1~|~1~|~01/MPO~|~ERPC MPO funding ERI - CR 5 - 3.19 to 5.61 113916~|~1~|~1~|~01/IMS~|~Systematic sign replacement at various locations in Madison County 103525~|~1~|~1~|~01/S>2~|~FY2020 Urban Paving for the City of Milford on US50 within the City of Milford. The limits are 0.00 - 2.21 - US50. This Plan Split is for the items paid at 80% ODOT and 20% City mainly consists of planing, new asphalt overlay and final striping. 103525~|~1~|~2~|~02/S>2~|~FY2020 Urban Paving for the City of Milford on US50 within the City of Milford. The limits are SLM 0.00 - 2.21 - US50 within the City. This Plan Split is for the items paid at 100% City: mainly consist of pavement repair, MOT striping, utility work, curb & gutter and curb ramps. 107839~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 8.43-8.47. 100% Federal ER funded. 105573~|~1~|~1~|~01/NHS~|~All work in this project. On the NHS. All funds are from the District Preservation Program budget. No local funds. 107583~|~1~|~1~|~01/NFP~|~Paint Inspection Task Order 107777~|~1~|~1~|~01/STR~|~Plan split created 88768~|~1~|~2~|~02/STR~|~Replace deteriorating wearing surface CHP SR 560 0156 over Nettle Creek with no approach work except approach slabs. Asphalt overlay precluded by legal load rating. 88768~|~1~|~1~|~01/BRO~|~Replace deteriorating wearing surface on SFN 1103121 CHP SR 560 0148 over Owens Creek with no approach work except approach slabs. Asphalt overlay precluded by legal load rating. 92361~|~1~|~1~|~01/STR~|~resurface FUL SR108 0.00 -2.96 - Henry County line to Wauseon Corp line 92361~|~1~|~2~|~02/S<2~|~SLM 2.96 to 3.47 92361~|~1~|~3~|~03/S<2~|~Urban Paving Funding Split in Wauseon 92361~|~1~|~4~|~04/NFP~|~100% City items in Wauseon 92361~|~1~|~5~|~05/SAF~|~Center Line Rumble Stripe Plan split - FUL - SR 108 - 0.0 to 3.016 123515~|~1~|~1~|~01/NFP~|~Test lab consultant inspector 93445~|~1~|~1~|~01/NHS~|~Construction of noise walls along State Route 8 between SLM 16.66 and SLM 17.55, in Summit County, Ohio. 121471~|~1~|~1~|~01/NHS~|~Joint repairs within the project limits 104993~|~1~|~2~|~02/STR~|~Replacement of GUE-658 culvert 104993~|~1~|~1~|~01/IMS~|~Repair or replacement of identified Conduits along IMS system. 123577~|~1~|~1~|~01/IMS~|~Pavement repairs on GRE-675 94255~|~1~|~1~|~01/IMS~|~01/IMS/PV/ ; District Preservation 4PF7 (90% federal) / 4PS7 (10% state) - No Cap - All work in this project is in this split. 119102~|~1~|~1~|~01/STR~|~Resurfacing. 102731~|~1~|~1~|~01/STR~|~This plan split is for bridge size culverts on rural route. 77239~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - TRAC Funding TRAC (80% Federal) / TRAC(20% State) - No CAP - New Construction on 1) Mus-SR 16-10.25 to 14.86; 2) Cos-SR 16-00.00 to 07.35 109211~|~1~|~1~|~01/S<2~|~Construction Inspection 109211~|~1~|~2~|~02/S<2~|~Construction Inspection 109211~|~1~|~3~|~03/S<2~|~Construction Inspection. 109211~|~1~|~4~|~04/S50~|~Construction Inspection 117316~|~1~|~2~|~02/NHS~|~CO CC NHS plan split linked to 1987474 117316~|~1~|~1~|~01/IMS~|~HAM-275-0900 (1839674), HAM-74-1091 and HAM -74-1095 have been linked to CO CC IMS funding 108817~|~1~|~1~|~01/NFP~|~Replacing the linked culverts. 122476~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 101028~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract for FY2022 in D8. Locations to be determined. 98721~|~1~|~1~|~01/NFP~|~Mowing contract. Maintenance contract funds. 100% state funds. SAC 4CP7. 119560~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 105204~|~1~|~1~|~01/NHS~|~plan split for the pavement repairs on a portion of HAM-126 and incidental bridge patching work 106640~|~1~|~1~|~01/STR~|~Bridge rehab to include floorbeams, stringers & deck. No approach work. 76691~|~1~|~3~|~03/IMS~|~03/IMS/PV/ Work reconstructing the Interstate including the ramps. It does not include work replacing or reconstructing the bridges. The bridge work is in another split. Funding from the Major Rehabilition program. 76691~|~1~|~5~|~05/ENH~|~05/ENH/OT/ Transportation Enhancement eligible activities. 76691~|~2~|~7~|~07/CMQ~|~07/CMQ/OT/ CMAQ eligible pedestrain facilities along the SR 117/309 corridor outside the interchange area. The CMAQ elgibility was approved March 28, 2011. The cap on the MPO-CMAQ funds for this split is $132,770. Pedestrian facilities in the interchange area, also funded with CMAQ funds, are in a Plan Split in part 1. 76691~|~1~|~4~|~04/S<2~|~04/S<2/PV/ Roadway work on SR 81 and SR 117/SR 309. Costs for the traffic signal work is also in this split. Funds from the Major Rehabilition program. 76691~|~1~|~1~|~01/CMQ~|~01/CMQ/OT/ MPO-CMAQ funding approved for this project to construct sidewalks along SR 117/SR 309 in the interchange area. CMAQ cap is $50,000. 20% match and overage from the Major Rehabilition program. The approval letter for CMAQ funds was dated March 28, 2011. The CMAQ funds are from the Lima MPO. 76691~|~2~|~6~|~06/SAF~|~06/SAF/OT/ Safety improvements to the SR 117/309 corridor. Funds from the ODOT Central Office controlled safety program. This split does not cover the pedestrain facilities along the corridor. On SR 117 from 0.02 mile west of Roschman Avenue jct to Greely Chapel Road jct. and on SR 309 from Willard Street to Devonshire Drive. 76691~|~1~|~2~|~02/IMS~|~02/IMS/BR/ Work replacing or reconstructing bridges. The work in this split is not eligible for federal BR funds. Funds from the Major Rehabilition program. 96972~|~1~|~1~|~01/IMS~|~2 year maintenance contract for Lighting and Loop Repair on various Highways in ATB, MAH and TRU counties. 99001~|~1~|~1~|~01/NFA~|~Maumee River MUP 122272~|~1~|~1~|~01/MPO/MASS~|~Signal improvements. 88398~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 87641~|~1~|~1~|~01/S<2/NEWA~|~"01/S<2/PV/NEWA" - Local Funding LCATS 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP 4TA7 of $449,136.00 Federal - Resurfacing of: 1) 30th Street Lic-CR 802-01.27 to 2.05; 2) W. Main Street Lic-CR 132-00.24 to 01.55; 3) Cherry Valley Road Lic-CR 128-00.66 to 00.99; 87641~|~1~|~3~|~03/S<2/GRAN~|~"03/S<2/PV/GRAN" - Local Funding LCATS 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP 4TA7 of $125,558.00 Federal - Resurfacing in Village of Granville of Cherry Valley Road Lic-CR 128-00.30 to 00.66 87641~|~1~|~2~|~02/S<2/HEAT~|~"02/S<2/PV/HEAT" - Local Funding LCATS 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP 4TA7 of $300,000.00 Federal - Resurfacing of 30th Street Lic-CR 802-00.39 to 01.27 85611~|~1~|~1~|~01/STR~|~Split for all work on the Rural STP system from SLM 0.00 to SLM 1.39 85611~|~1~|~2~|~02/S>2~|~Split for all work on the Urban STP sytem from SLM 1.39 to SLM 3.57. 95925~|~1~|~1~|~01/NHS~|~Overlay bridge deck with LMC using hydrodemolition, reface/patch parapet, seal median joint, refurbish & rest abutment bearings, various structural steel repairs and other various bridge items. Bridge # MIA-36-1134, SFN 5500095. 95925~|~1~|~2~|~02/NHS~|~Roadway work associated with a shared use path. 94491~|~1~|~1~|~01/CMQ/CIN~|~Construction of a combination of 10' wide bike path and existing and new 5' wide side path along the west side of Kellogg Avenue to connect the existing trail system at Salem Road and Sutton Road. Retaining walls will be constructed to accommodate grading and aid with slope stability. 94491~|~1~|~2~|~02/CMQ~|~Construction of a shared use path that follows US-52 between Salem Avenue and Sutton in Cincinnati. 95102~|~1~|~1~|~01/S>2~|~Resurfacing of Palmyra, Highland, Main streets, including curb ramps, guardrail, signing, and pavement markings, in the City of Warren, Trumbull County, Ohio. 91559~|~1~|~1~|~01/BRO~|~Replace existing box-beam superstructure on bridge (HOL-62-1818, SFN 3801403) with a new steel beam superstructure. Repair substructure units. 114650~|~1~|~1~|~01/IMS~|~Paint bridge HAM-74-0838L/R which carries I-74 over Great Miami River and repair steel for HAM-74-0911L which carries WB I-74 over Wesselman Rd and Taylor Creek 103794~|~1~|~1~|~01/MPO~|~Resurfacing of a park road. 77887~|~1~|~2~|~02/NHS~|~Click on plan split to see linked bridges. 77887~|~1~|~3~|~03/IMS~|~Interstate bridges. 77887~|~1~|~1~|~01/NHS~|~Plan split for pavement for STA US 30 from 13.10 to 16.72. 77887~|~1~|~4~|~04/NHS/CANT~|~Alternate bids for LED Lighting. City of Canton is paying the difference between "normal" lighting and LED. 116771~|~1~|~1~|~01/NHS~|~Resurfacing. 116771~|~1~|~2~|~02/STR~|~Resurfacing. 84592~|~1~|~3~|~03/STR~|~Plan Split for SFN 6703402 POR SR 82 15.19 over Silver Creek, SFN 6703437 POR SR 82 16.81 over Eagle Creek, SFN 6703488 POR SR 82 19.01 over Branch of Eagle Creek, SFN 6703496 POR SR 82 20.76 over Branch Eagle Creek, SFN 6703526 POR SR 82 21.70 over Eagle Creek. SFN 6704506 POR SR 303 19.51 over Branch of Eagle Creek. 84592~|~1~|~1~|~01/STR~|~Created Plan Split STP Rural for POR SR-82 from 10.65 to 22.53. Resurfacing of TRU SR-82 from 0.00 to 1.63, Braceville Township, Trumbull County, Ohio. 84592~|~1~|~2~|~02/BRO~|~Plan Split for SFN 6703364 POR SR 82 10.65 over Cuyahoga River 94682~|~1~|~1~|~01/NFA~|~All work cna be paid for with all of the various funds. 98595~|~1~|~1~|~01/IMS~|~Slide @ LUC-75-8.51 NB 92639~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 2 years Herbicidal Spraying Contract 102047~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at Norton and Johnson Road 103854~|~1~|~4~|~04/S>2~|~Waterline relocation, project eligible. 103854~|~1~|~3~|~03/S>2~|~Conduit replacements, extensions, and removals. 103854~|~1~|~2~|~02/S>2~|~Replacement of drainage system, curb and gutter. 103854~|~1~|~1~|~01/S>2~|~Pavement resurfacing/replacement in the Village of New Middletown. 112553~|~1~|~1~|~01/STR~|~Resurfacing project with an asphalt overlay treatment. HOC CR 249 0.00-3.32. Rural federal aid funded 80 Federal/20 Local. 109164~|~1~|~1~|~01/IMS~|~Repairs and deck overlays on 7 bridges on FRA IR 71 between 17th Ave and SR 161 109164~|~1~|~2~|~02/IMS~|~Bridge Items associated with widening the bridges. 109164~|~1~|~3~|~03/IMS~|~ITS items associated with extra capacity 109164~|~1~|~4~|~04/IMS~|~Items associated with resurfacing of existing pavement 109164~|~1~|~5~|~05/IMS~|~Roadway Items associated with the widening of I-71. 91898~|~1~|~1~|~01/NFP~|~Resurfacing. 91898~|~1~|~2~|~02/NFP~|~Minor bridge work > 20' span. 115181~|~1~|~1~|~01/S>2~|~Rebuild the roadway including new street pavement, curb, sidewalk, street lights, and catch basins. 98020~|~1~|~1~|~01/NFA~|~Reconstruction and signalization of Honda Parkway 124032~|~1~|~1~|~01/NHS~|~Replace superstructure 110567~|~1~|~2~|~02/S<2~|~Bridge Maintenance Project to perform minor maintenance bridge repairs. 110567~|~1~|~3~|~03/NHS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs. 110567~|~1~|~4~|~04/STR~|~Bridge Maintenance Project to perform minor maintenance bridge repairs. 110567~|~1~|~5~|~05/SAF~|~Epoxy overlay on SFN's 3106497 and 3106551 to increase pavement friction. 110567~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs on Interstate bridges (Not funded by Safety) 110567~|~1~|~6~|~06/IMS~|~Place HFST on I-71 just south of the Lytle Tunnel. 110567~|~1~|~7~|~07/IMS~|~Work to repair collision damage to bridge WAR-63-0010. 4SR7 (Bridge collision repair funds to be utilized for this structure only). 110567~|~1~|~8~|~08/IMS~|~Plan split associated with installation of West Chester Township's decorative VPF on the HAM-75-1747 structure. Fence procured under PID 105478 and being installed under this PID. 121204~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items 100784~|~1~|~1~|~01/SAF~|~Construction of a rural single lane modern roundabout at the intersection of Old SR-122 and Township Line Road. The vertical profile of the east leg of Old SR-122 will also be adjusted to improve sight distance to the intersection. 123324~|~1~|~1~|~01/IMS~|~Resurfacing. 123324~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance to multiple bridges. 90701~|~1~|~1~|~01/MPO~|~reconstruct LUC CR2233 0-2.23; reconstruct South Ave from Reynolds Rd to Byrne Rd 114486~|~1~|~1~|~01/S>2~|~Split for bridge work 119158~|~1~|~1~|~01/NHS~|~All work outside the Defiance Urban Area. 115224~|~1~|~1~|~01/SAF/HOL~|~Pavement marking on various county routes using 100% (4HB7) CEAO Safety funds. 120580~|~1~|~1~|~01/S>2/KY~|~Bridge repairs. 97031~|~1~|~1~|~01/NFA~|~Construction of 800 feet of a two-lane access road to new health care facility in MEG County. ARC funded project. Funded 100% federal. Overages will be paid by local. 103436~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from both safety funds and state district preservation funds. 112660~|~1~|~1~|~01/MPO~|~Resurfacing of North Rd from SR 169 to US 422 in the City of Niles. 116621~|~1~|~1~|~01/NHS~|~NHS Plan Split 116621~|~1~|~2~|~02/S5K~|~STP>5 Plan Split 92086~|~1~|~3~|~03/BRO~|~3 span concrete slab deck bridges peir encasement repair on all piers, piers 1 & 2 (left and right) with no approach pavement work along with clearing and grubbing on SFN 5401291 MER SR 118 0201 Wabash River. 92086~|~1~|~2~|~02/BRO~|~3 span concrete slab deck bridges peir encasement repair on all piers, piers 1 & 2 (left and right) with no approach pavement work. Clearing adn grubbing required on SFN 1904086 DAR SR 705 1504 Arling Joint Ditch. 92086~|~1~|~4~|~04/STR~|~3 pan concrete slab deck bridges pier encasement repair on all piers, piers 1 & 2 s (left and right) with no approach pavement work along with clearing and grubbing on SFN 5501202 MIA SR 48 1765 over Old Chan Trotters Creek. 92086~|~1~|~1~|~01/BRO~|~3 span concrete slab deck bridges peir encasement repair on all piers, peirs 1 & Pier 2 (left and right) with no approach pavement work. Clearing and grubbin required on SFN 5704200 MOT SR 49 0621 100514~|~1~|~1~|~01/NHS~|~Plan Split for all joint repairs on SU 52 within the project limits. 118925~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items 118925~|~1~|~2~|~02/NFA~|~100% Local split 117214~|~1~|~2~|~02/S5K~|~resurfacing and related roadway work from 11.96 to 14.62 117214~|~1~|~1~|~01/STR~|~resurfacing and related roadway work from 8.03 to 11.96 117540~|~1~|~1~|~01/NFA~|~ODNR Bridge and Culvert replacement. 123435~|~1~|~1~|~01/BRO~|~Replace Span Locks for ERI-6-9.67 122377~|~1~|~1~|~01/NFP~|~Culver Liner Replacements for GAL SR 7 CFN: 1983098, 1829123, 1829719, 1992163, 1992168, and 1864258. 102962~|~1~|~1~|~01/STR~|~STP Rural Microsurfacing: MED-421 114542~|~1~|~1~|~01/S>2~|~Resurfacing. 102325~|~1~|~1~|~01/SAF~|~Pavement marking upgrade of existing on various Mercer County roads. 114819~|~1~|~2~|~02/STR~|~Rural plan split 114819~|~1~|~1~|~01/S5K~|~STP>5 Urban Area plan split 99753~|~1~|~1~|~01/ENH~|~80% federal pariticipation with 20% local matching funds for the construction of a multi-purpose path using MPO Transporation Alternative Program funding. 109314~|~1~|~1~|~01/STR~|~CEAO funded bridge rehab of Marion-Galion Rd over Flat Run 116083~|~1~|~1~|~01/NFP~|~Districtwide crack sealing. 103880~|~1~|~1~|~01/IMS~|~plan split 99452~|~1~|~1~|~01/SAE~|~Guardrail Replacement project with 100% HSIP (CEAO Safety Funds) 101936~|~1~|~1~|~01/S<2~|~Plan split for bridge Other Federal Hwy - Major Collector. 123653~|~1~|~1~|~01/IMS~|~All work associated with the resurfacing of IR 270 and IR 71. 96262~|~1~|~1~|~01/SAF~|~This split uses federal Safe Routes to School funding and uses Toll Revenue Credit to bring the federal percentage to 100%. 122791~|~1~|~1~|~01/SAF~|~All roundabout work included in this split. 97261~|~1~|~1~|~01/STR~|~Landslide repair project by installing a Hpile retaining wall. 116774~|~1~|~1~|~01/NHS~|~HUR US 0250 12.91 100204~|~1~|~1~|~01/IMS~|~Replace loop ramp with flyover ramp 110435~|~1~|~1~|~01/NHS~|~Resurfacing of SR 79. 110435~|~1~|~2~|~02/NHS/HEAT~|~Resurfacing of SR 79 within city of Heath. 100184~|~1~|~1~|~01/S<2~|~Work on CR 236 from SR 568 to US 224. 80% federal STP funds from the City of Findlay budget. The 20% non-federal match will be provided by the City of Findlay. 117964~|~1~|~1~|~01/S50~|~Urban Paving 103282~|~1~|~4~|~04/STR~|~Resurfacing of POR SR 88 from 2.54 to 4.03 and POR SR 303 from 17.77 to 17.78. 103282~|~2~|~8~|~08/STR~|~Replacing linked structure > 20' span. 103282~|~1~|~3~|~03/S>2~|~Resurfacing of POR SR 88 from 1.51 to 1.96 and 2.08 to 2.54. 103282~|~1~|~1~|~01/S>2/RAVE~|~Resurfacing of POR SR 88 from 0.00 to 1.51 and 1.96 to 2.08 in the City of Ravenna, Urban Paving 80/20. 103282~|~1~|~2~|~02/S>2/RAVE~|~100% City items in Ravenna 103282~|~1~|~7~|~07/S>2~|~See linked structure 10' to 20' span. 103282~|~1~|~5~|~05/S<2~|~Resurfacing of POR SR 303 from 17.78 to 20.63. 103282~|~1~|~6~|~06/S<2~|~Minor bridge work to linked structure > 20' span. 103282~|~3~|~9~|~09/STR~|~Resurfacing POR SR 44 from 22.14 to 24.05, POR SR 82 from 9.40 to 10.62. 103282~|~3~|~10~|~10/NFA~|~Resurfacing of SR 282 from 0.00 to 2.69. 113593~|~1~|~1~|~01/IMS~|~This plan split are for those pay items on the interstate highway system. 113593~|~1~|~3~|~03/S<2~|~This plan split are for those pay items on the other federal aid system. 113593~|~1~|~2~|~02/NHS~|~This plan split are for those pay items on the NHS system. 113593~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 97462~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project 122288~|~1~|~1~|~01/BRO~|~Bridge work. 115800~|~1~|~1~|~01/NFA~|~Created for J&C involvement 102389~|~1~|~1~|~01/SAF~|~Pavement marking project foy FY2022. Funded 100% state. 100344~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. 80% federal SAC 4PF7 and 20% state SAC 4PS7. No local funds. The federal funds are rural STP. 109923~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funding using SAC 4PS7. 114940~|~1~|~1~|~01/S>2/YOUN~|~Resurfacing, urban paving in the City of Youngstown. 114940~|~1~|~2~|~02/S>2/YOUN~|~Full and partial pavement repairs and ADA curb ramps. 94220~|~1~|~1~|~01/NFP~|~District Preservation 4PS7 (100% state) - No Cap - All work in this project is in this split. 102709~|~1~|~1~|~01/STR~|~Resurfacing on SR 93 and minor bridge maintenance work. 102709~|~1~|~2~|~02/STR~|~Resurfacing, roadway edge repair/replacement, guardrail upgrade, and associated bridge maintenance. 80123~|~1~|~1~|~01/STR~|~Bridge Replacement 107569~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 123810~|~1~|~1~|~01/BRO~|~Bridge Hit 92389~|~1~|~1~|~01/BRF~|~McColley Covered Bridge preservation awarded through NHCB as it is a Historical Bridge SFN 4631137 LOG CR 13 0158 92621~|~2~|~2~|~02/MPO~|~Corrected plan split for 100% local items 92621~|~1~|~1~|~01/MPO~|~Mill & Fill 89905~|~1~|~2~|~02/SAF~|~Plan Split for all Greater Cincinnati Water Works utility work along SR 264. All items to be paid 100% by GCWW. 89905~|~1~|~1~|~01/SAF~|~Widen Westbourne Drive to provide dual left turn lanes to go north on SR264 and widen southbound SR-264 to provide a right turn lane at Westbourne, which will extend thru the intersection of Lawrence Road 114785~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4. 107256~|~1~|~1~|~01/NHS~|~Landslide repair project. GAL 35 13.07. GSM funded. NHS route funded 80 federal/20 state. 95223~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip-seal treatment. ATH 329 0.00-12.19, 13.66-19.65, MRG 329 0.00-3.79, VIN 677 0.00-4.33. Rural Federal Aid route, 80% Federal/20% State funded. 95223~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a chip-seal treatment. VIN 683 0.00-0.37. Urban other federal aid funded 80 Federal/20 State. 95223~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using a chip-seal treatment. VIN 683 0.37-8.22. Not on the federal aid system funded 100% State. 98890~|~1~|~1~|~01/IMS~|~Funding for replacement of superstructure on two bridges (TUS-77-0527 L & R, SFN 7902190, 7902220) carrying IR 77. 98890~|~1~|~2~|~02/NHS~|~Replace pavement on US 36 (Westbound) under TUS-77-0527 bridges to provide required Vertical Clearance. 96773~|~1~|~1~|~01/STR/ADA~|~It is proposed to replace the Old State Route 32 bridge on CR 100 at SLM 4.035 SFN 0137308. 88304~|~1~|~2~|~02/STR~|~Plan split for DEF-2-0.52 using 100% state funds. Bridge is NOT eligible for federal BR funds. 88304~|~1~|~1~|~01/BRO~|~Plan split for DEF-49-0446 which is eligible for federal BR funds. 91856~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehab abutments and overlay of SFN 2301237 FAI SR37 7.36 Intersect: Walnut Creek: BR Eligible: Length=119 SD/FO(1) SR=36.7 DSR=5; 91856~|~2~|~2~|~02/S<2~|~"02/S<2/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehab abutments and overlay of SFN 2301326 FAI SR37 19.62 Intersect: Tributary Of Raccoon Run: BR Eligible: Length=67 SD/FO(1) SR=69.8 DSR= 6 93812~|~1~|~1~|~01/NFP~|~100% state funds (4mp7) for district wide rpm replacement. 105392~|~1~|~1~|~01/STR~|~CO STR CV funding split established. 105392~|~1~|~2~|~02/S>2~|~CO S>2 CV funding event established. 105392~|~1~|~3~|~03/NHS~|~CO NHS CV funding split established. 104989~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funds - 4PS7 (100% State) - No Cap - Spot Paving and repairs on selected OFAH-Rural Roadways in District 5 107125~|~1~|~1~|~01/S>2~|~Urban Paving - City of Springboro - Southern Corp to SR 73. 107125~|~1~|~2~|~02/S>2~|~Items to be covered 100% by the City of Springboro. 107495~|~1~|~1~|~01/STR~|~Resurfacing CAR-644, COL-39 and COL-644 104981~|~2~|~2~|~02/STR~|~Bridge replacement of SFN 4501837 (LIC SR 37 19.38) 104981~|~1~|~1~|~01/STR~|~Replacement of LIC-37-18.94 (SFN 4501810) 110133~|~1~|~1~|~01/STR~|~Repair work on GRE-343 117197~|~1~|~1~|~01/STR~|~Split for resurfacing work 99366~|~1~|~1~|~01/S>2~|~SFN 1200615, CLA-40-0068 on Mud Run - Bridge repaior and rehabilitation by refacing forward abutment, rebuild deck corners with anodes, repair bridge deck, pothole repair and reseal approach slab to bridge joints and seal deck wearing surface with SRS C&MS Item 705.24. 99366~|~1~|~2~|~02/NHS~|~SFN 4600223, LOG-33-0641 on the Great Miami River - Remove asphalt wearing surface and waterproofing from non-composite box beam structure (non-composite) system with strip seal expansion provision.SFN 4600215, LOG-33-0641 L - remove the existing substructure. 84048~|~1~|~1~|~01/ENH~|~A railroad visitor center in the City of Fostoria. 108039~|~1~|~1~|~01/NHS~|~Bridge Replacement. 121357~|~1~|~1~|~01/STR~|~Plan split for all work associated with WIL-15-0154 bridge 84584~|~1~|~1~|~01/STR~|~Federal Rural STP funds. Bridge Replacement not eligible for federal BR funds. All funds from the District Preservation Program. 80% SAC 4PF7 and 20% SAC 4PS7. 107977~|~1~|~1~|~01/SAE~|~Repair to an existing slide on the uphill side of Tealtown Road, by installing a drilled pier retaining wall. 106519~|~1~|~1~|~01/NHS~|~NHS Route 115352~|~1~|~1~|~01/MPO/LAKE~|~Resurfacing. 104802~|~1~|~1~|~01/SAE~|~Install/Upgrade guardrail at various county route locations. 106999~|~1~|~1~|~01/STR~|~Micro milling on pavement surface on sold PID 93877. WAS 60 3.60-19.73 and WAS 60 21.03-24.09. 100% State Emergency funds (SAC 4BE7). Type A Emergency contract. 112824~|~1~|~1~|~01/NHS~|~Resurfacing US 250 113756~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 97195~|~1~|~2~|~02/SAF~|~Improvements on SR-64. 97195~|~1~|~1~|~01/NFP~|~Lump sum contribution from the local 92401~|~1~|~1~|~01/NFP~|~Facilities work using state 4MA7 funds. 98006~|~1~|~1~|~01/STR~|~Bridge Replacement 109924~|~1~|~1~|~01/NFP~|~All work is in this plan split using 100% state funds from SAC 4PS7, district preservation funds. 103059~|~1~|~1~|~01/NHS~|~SCI 52 24.73 Rock removal/barrier in City of Portsmouth. 122296~|~1~|~1~|~01/NHS~|~Plan Split for bridge replacment 112038~|~1~|~5~|~05/SAF~|~Culvert SafetyCulvert work due to pavement widening. 112038~|~1~|~1~|~01/STR~|~Repair edge of pavement (M2) and resurface pavement (DAP) SLM 8.71-14.48 112038~|~1~|~6~|~06/SAF~|~Install centerline rumble stripes. 112038~|~1~|~2~|~02/SAF~|~Safety Widening Split to widen the pavement to 29ft 112038~|~1~|~3~|~03/STR~|~Bridge PreservationBridge maintenance on GRE-72 1033 & 1175 structures 112038~|~1~|~4~|~04/STR~|~Culvert PreservationCulvert maintenance (CFN's 1840073 & 1854334)and work on structure: GRE-72-09456 113983~|~1~|~1~|~01/NHS~|~1 3/4" mill and fill with super-pave asphalt 100588~|~1~|~1~|~01/STR~|~D09 Overlay FY24 83779~|~1~|~2~|~02/STR~|~Two-Lane resurfacing project using a Microsurfacing treatment. VIN SR 93 2.15-7.47, 8.75-18.08. Federal Aid route funded 80 federal/20 state. 83779~|~1~|~1~|~01/S<2~|~Two-Lane resurfacing project using a Microsurfacing treatment. VIN SR 93 0.00-2.15. Urban other federal aid funded 80 federal/20 state. 103900~|~1~|~1~|~01/STR~|~plan split 100481~|~1~|~1~|~01/STR~|~HIG 134 14.06-18.78ROS 772 0.00-10.35 114614~|~1~|~1~|~01/NFP~|~Plan split for Signing 76849~|~1~|~7~|~07/IMS~|~Removing of Wolf Ledges on-ramp to IR-76 Westbound, in the City of Akron, Summit County, Ohio. 76849~|~1~|~2~|~02/NHS~|~Plan Split for SFN 7701802 SUM SR 59 00.19 over Lakeshore and Russel Ave, SFN 7701810 & 7701829 SUM SR 59 00.44 L&R over Lakeshore, Ohio Canal and Thornton Ave, SFN 7702027 SUM SR 59 01.41K SB on Ramp K over Off Ramp L, SFN 7702035 SUM SR 59 01.42N NB on Ramp N over Off Ramp M, SFN 7702043 SUM SR 59 01.67 over Cedar St, SFN 7701853 SUM SR 59 01.77 Over West Exchange Street, SFN 7701861 SUM SR 59 01.86R NB OFF Ramp over On Ramp, SFN 7701888 SUM SR 59 01.99 under State Street, SFN 7701896 SUM SR 59 02.08 under Locust Street, SFN 7701926 SUM SR 59 02.32 under Bikeway, SFN 7701950 SUM SR 59 Ramp E Over bikeway, SFN 7701918 SUM SR 59 02.37 Ramp WB 59 to Mill St, SFN 7701942 SUM SR 59 02.55 over Ohio Canal Enclosure, SFN 7708629 SUM SR 261 08.20 over SUM SR 59, SFN 7700989, SUM-SR18-9.69 Ohio Canal enclosure. 76849~|~1~|~6~|~06/NHS~|~Plan Split to cover pavement markings. 76849~|~1~|~3~|~03/BRO~|~Plan Split for SFN 7701977 SUM SR 59 00.88 under Bartages, SFN 7701993 SUM SR 59 01.15 Under Dart Ave, SFN 7702000 SUM SR 59 01.26 under Euclid Ave, SFN 7701934 SUM 59 02.47 Connector Ramp to Mill Street, SFN 7702051 SUM SR 59 3.17 over CSX RR. 76849~|~1~|~1~|~01/NHS~|~Plan Split for Paving SUM SR 59 from 0.00 (Interstate 76) to 2.55 (Howard Street), in the City of Akron, Summit County, Ohio. 76849~|~1~|~5~|~05/NHS/Akrn~|~Plan Split for Partial and Full depth pavement repairs on SUM SR-59 (Perkins) from 2.55 (Howard Street) to 3.53 (State Route 8), in the City of Akron, Summit County, Ohio. 76849~|~1~|~4~|~04/NHS/Akrn~|~Plan Split for Paving SUM SR-59 (Perkins) from 2.55 (Howard Street) to 3.53 (State Route 8), in the City of Akron, Summit County, Ohio. 92976~|~1~|~3~|~03/S>2/PATA~|~"03/S>2/PV/PATA" - District Preservation Urban Paving 4PF7(Federal 80%) / 4BG7 (Local 20%) - No CAP - Urban Paving in City of Pataskala on 1) Lic-SR 310-02.64 to 04.83; 2) Lic-SR 310-04.94 to 05.52; 92976~|~1~|~5~|~05/NHS~|~"05/NHS/BR/ " - District Preservation Bridge Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Repair/replacement of pressure relief joint on: 1) Lic-SR 37-11.80 (SFN 4501667); 2) Lic-SR 210-10.05 (SFN 4505751); 92976~|~1~|~2~|~02/S>2~|~"02/S>2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Lic-SR 310-01.72 to 02.61; 2) Lic-SR 310-05.52 to 07.88; 92976~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on: 1) Lic-SR 310-07.88 to 10.05; 92976~|~1~|~6~|~06/STR~|~"06/STR/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7(20% State) - No CAP ? Traffic signal rehabilitation and related items: 1) Lic-SR 310/Morse Road (SLM 8.54); 92976~|~1~|~4~|~04/S>2/PATA~|~"04/S>2/PV/PATA" - City of Pataskala 4BG7(100% Local) - No CAP - ADA Ramps and other items requested by City 105565~|~1~|~1~|~01/IMS~|~FAY-71 109690~|~1~|~1~|~01/IMS~|~Resurfacing IR 70 107906~|~1~|~1~|~01/IMS~|~FAY-71 and associated bridges 84629~|~1~|~1~|~01/IMS~|~Plan Split for SFN 7705107 SUM-76-0362 under Clark Mill Road (CR-201) and SFN 7705255 SUM-76-0497 under Summit Road (CR-52) 84629~|~1~|~2~|~02/IMS/BARB~|~Reconstruction and relocation of City of Barberton waterline, Summit County, Ohio. 97860~|~1~|~1~|~01/NFP~|~General construction inspection services on various projects in D10 for FY2014 and FY2015. 89090~|~1~|~1~|~01/SAE~|~Guardrail replacement on various county routes in Mahoning County 110697~|~1~|~1~|~01/S<2~|~Construction Inspection 110697~|~1~|~2~|~02/S<2~|~Construction Inspection 115439~|~1~|~1~|~01/SAF~|~Plan split for intersection safety work. 105503~|~1~|~1~|~01/IMS~|~Plan Split for the interstate routes for the Systematic Sign Replacement 105503~|~1~|~2~|~02/S>2~|~Plan Split for the large Urban route locations for the systematic sign replacement 105503~|~1~|~3~|~03/NHS~|~Plan Split for the NHS route (HAM-42) for the systematic sign replacement 104026~|~1~|~1~|~01/ENH~|~Rehabilitation of a luden arch type bridge on MOE TR 313 0.04 (SFN 5634555), that spans the Little Muskingum River. Funded 80 federal/15 credit bridge/5 local. 107455~|~1~|~1~|~01/S<2~|~Intersection improvement at SR 147 and SR 800; 100& federal funds (80% 4TA7 and 20% TRC) 91947~|~1~|~1~|~01/IMS~|~80/20 Maint. Funds for 1 year 120391~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 120736~|~1~|~1~|~01/IMS~|~Plan Split to resurface the median shoulder to remove the rumble strips from the future SmartLane 123747~|~1~|~1~|~01/STR~|~Plan split at 80/20 for resurfacing work on STP Rural 117314~|~1~|~1~|~01/SAF~|~Pedestrian improvements are multiple locations. 93503~|~1~|~1~|~01/NFA~|~Construct a road extension of Abbott Parkway from County Road 25A west three lane with center turn lane including base asphalt wearing surface along wiht street lighting, traffic control signage. 101521~|~1~|~1~|~01/NHS~|~Highway Lighting 101324~|~1~|~1~|~01/IMS~|~CO CO Contr 01 plan split created for the following Interstate route: FRA-270-43.24-48.47 101324~|~1~|~2~|~02/IMS~|~CO CO Engr 01 plan split created for the following Interstate route: FRA-270-43.24-48.47 100482~|~1~|~1~|~01/STR~|~ADA 125 (9.22-14.71) 112496~|~1~|~1~|~01/STR~|~Chip Seal 121958~|~1~|~1~|~01/SAF/PAT~|~Turn lanes and signal improvements at the intersection of Broad Street and Taylor Road in Pataskala. 111021~|~1~|~1~|~01/SAF~|~Safety funded plan split 101084~|~1~|~1~|~01/NHS~|~Emergency job on BRO 125 7.00-7.60 100645~|~1~|~1~|~01/S>2~|~plan split for pavement work in the large urban sections:BUT-127: SLM 7.48-13.99 100645~|~1~|~2~|~02/STR~|~plan split for pavement work in the rural sections: BUT-127: SLM 13.99-21.06 103632~|~1~|~1~|~01/IMS~|~Concrete pavement repair to SUM-IR 77 from 15.18 to 15.86. 103632~|~1~|~2~|~02/IMS~|~Joint repair to linked 20'+ structure. 124123~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 160 17.37 (SFN 2702347). Funded 80 Federal/20 State. 94498~|~1~|~2~|~02/BRO~|~Bridge repair project. Work includes pile encasement and deck patching. ATH 78 0752 (SFN 0502820). BR eligible funded 80 federal/20 state. 94498~|~1~|~1~|~01/STR~|~Bridge repair project. Work includes pile encasement and deck patching. ATH 144 0141 (SFN 0503061). Rural other federal aid funded 80 federal/20 state. 109523~|~1~|~1~|~01/SAF~|~intersections and signals 109523~|~1~|~2~|~02/ENH~|~Non-safety items, 100% LPA 110758~|~1~|~1~|~01/S>2~|~Split for the federal eligible work 110758~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work items at 100% local cost. 96663~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using as asphalt overlay treatment with repair. MOE 379 4.57-6.05 and NOB 513 9.46-12.45. Rural other federal aid funded 80 federal/20 state. 96663~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using as asphalt overlay treatment with repair. MOE 379 0.00-4.57, 6.05-8.07 and NOB 513 0.00-9.38. Not on any federal aid system funded 100% state. 105926~|~1~|~1~|~01/MPO~|~Work eligible for federal-aid 83823~|~1~|~1~|~01/STR~|~Preventative Maintenance on the General System for FY2013 92858~|~1~|~1~|~01/MPO~|~Added plan split 106125~|~1~|~1~|~01/S>2~|~Washington Street Bike Path in the City of Dayton. 114180~|~1~|~1~|~01/NFP~|~Crack seal locations in D-2 124025~|~1~|~1~|~01/IMS~|~Plan split for non-federal bridge repair on interstate system 124025~|~1~|~2~|~02/NHS~|~Plan split for federal bridge culvert repair on an NHS route 124025~|~1~|~3~|~03/S>2~|~Work for non-federal bridge rehabilitation on other federal aid route urban area. 91594~|~1~|~1~|~01/TRN~|~Mahoning Rd underground conduit installation 124869~|~1~|~1~|~01/NFP~|~2-year lighting work order in POR, STA and SUM counties. 119167~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment on GAL 35 13.36-17.68 and GAL 735 0.00-1.41. 110524~|~1~|~2~|~02/NHS~|~Bridge Plan split 110524~|~1~|~1~|~01/NHS~|~Pavement Rehab plan split 110524~|~1~|~3~|~03/NHS~|~Plan split for removal of structures HEN-6-1226L&R 119163~|~1~|~1~|~01/STR~|~MEG-681-21.18-28.95 Resurfacing 99038~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for week control on US 33 on 4 lane and 2 lane 93561~|~1~|~1~|~01/IMS~|~Bridge deck overlay, pier patching, parapet retrofit, conversion of abutment to semi-intergral, and painting of beams on SFN 5503450 MIA 75 1995. 102984~|~1~|~1~|~01/NFA~|~Smooth seal on Non-Federal route: SHE SR 119 SLM 9.44 to 15.72. 102984~|~1~|~2~|~02/STR~|~Smooth seal on rural route: SHE SR 119 SLM 9.35 to 9.44. 107931~|~1~|~1~|~01/STR~|~All work in this split. Resurface on SR 235 using district preservation funds (80% Fed and 20% state). 121044~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 107924~|~1~|~1~|~01/IMS~|~Widening of linked structure > 20' span. 105768~|~1~|~1~|~01/MPO/Whit~|~Improve intersection of Broad St at Hamilton Rd 122057~|~1~|~1~|~01/S50/MAN~|~Improve signal visibility by replacing the span wire installation with mast arms and add backplates/supplemental signal heads at Trimble Road in Mansfield. Upgrade pedestrian accommodations with high visibility crosswalks and new crossing on the east approach 106386~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair projects. DSR ATH-005, ATH CR 42 3.74. Funded 80 federal/20 local. 118821~|~1~|~1~|~01/S>2~|~Chip seal. 118821~|~1~|~3~|~03/STR~|~Chip seal. 118821~|~1~|~2~|~02/S5K~|~Chip sealing. 99608~|~1~|~1~|~01/NFP~|~Herbicidal Spraying 98577~|~1~|~1~|~01/SAF~|~Project includes replacing existing non-standard guardrail, and installing new guardrail where needed. Berm work will be performed and guardrail will be added where vertical drop-offs are a concern. 96721~|~1~|~1~|~01/NFA~|~Ashtabula County SR 11 SB, build 3,000 ton Salt Storage building to be shared with Trumbull County 93947~|~1~|~1~|~01/NFP~|~District wide RPM plan for the FY 16 systematic RPM replacement project using 4PS7 sac code. 77922~|~1~|~4~|~04/STR~|~Plan split for all roadway work including resurfacing on CLI-729 77922~|~1~|~1~|~01/STR~|~Replace culvert SFN 1870603 and bridge SFN 1403664 77922~|~1~|~3~|~03/STR~|~Replace the existing superstructure of Bridge No. CLI-729-1329, SFN: 1403788. Replace the superstructure of bridge CLI-279-1588, SFN: 1403877. 77922~|~1~|~2~|~02/STR~|~Plan split for bridge replacement, structure CLE-729-0935 SFN: 1403729. 98953~|~1~|~1~|~01/S>2~|~Woodruff 93192~|~1~|~1~|~01/NHS~|~Rock slope failure to be remediated by laying the slope back with benching. Federal Disaster OH12-01 DSR JEF-001. 77916~|~1~|~1~|~01/STR~|~Replace existing superstructure and widen Bridge No. BUT-126-0533, SFN: 0902527. Bridge carries SR 126 over Camp Run. 102350~|~1~|~1~|~01/IMS~|~Double Microsurfacing of POR IR 76 from 13.55 to 19.34 102350~|~1~|~2~|~02/STR~|~Microsurfacing of POR SR 14 from 25.41 to 28.77 and POR SR 183 from 3.00 to 7.61 94893~|~1~|~2~|~02/STR~|~Bridge split for asphalt replacement:SFN 5101999 MAR-37-1.71 Intersect: Paw Paw RunSFN 5102022 MAR-37-2.55 Intersect: Paw Paw Run 94893~|~1~|~1~|~01/STR~|~D6 funding for resurfacing of MAR-309, 0.00-3.31 93698~|~1~|~2~|~02/NHS/FIND~|~This plan split is for pavement repair inside the City of Findlay on sections of US 224, SR 12 and SR 37 that are on Main Street. This work is 100% locally funded. All the funds are provided by the City of Findlay. 93698~|~1~|~1~|~01/NHS~|~This is for resurfacing inside the City of Findlay on sections of US 224, SR 12 and SR 37 that are on Main Street. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Findlay. 124847~|~1~|~1~|~01/NHS~|~Culvert replacement NHS 124847~|~1~|~2~|~02/STR~|~Culvert replacement STP Rural 93798~|~1~|~1~|~01/S<2~|~Emergency Type A project. Bridge repair work on ATH 682 0.14, SFN 0504750. Funded 100% state. 122233~|~1~|~1~|~01/NFA~|~NEVI Round 2 SR-13-B 122233~|~1~|~2~|~02/NFA~|~NEVI Round 2B SR-13B 104940~|~1~|~1~|~01/STR~|~plan split 88842~|~1~|~2~|~02/S<2/FOST~|~This split is for SR 18 inside the City of Fostoria. Federal STP funds are used. The City of Fostoria is responsible for the 20% non-federal match. 88842~|~1~|~1~|~01/NHS~|~This split is for SR 12 outside of the City of Fostoria. Federal NHS funds are used. ODOT District One is responsible for the 20% non-federal match. There are no local funds in this split. 88842~|~1~|~3~|~03/STR~|~This split is for SR 18 & SR 613 outside of the City of Fostoria. Federal STP funds are used. ODOT District One is responsible for the 20% non-federal match. There are no local funds in this split. 88842~|~1~|~4~|~04/NFP/FOST~|~Items paid 100% by the City of Fostoria such as auxilary pavement parkings, full depth pavment repair, and curb ramps. 91840~|~1~|~1~|~01/STR~|~General system asphalt overlay on COL-344-3.06 to 4.56; includes pavement repairs and pavement marking 91840~|~2~|~2~|~02/S<2~|~General system asphalt resurfacing on COL-164 SLM 22.23 to 24.31 and COL-344 SLM 2.79 to 3.06 and SLM 4.56 to 8.35; includes pavement repairs and pavement marking. 91840~|~1~|~3~|~03/S<2~|~Work added as requested by the Village of Leetonia and funded by the Village. 117990~|~1~|~1~|~01/NFA~|~Bridge Rehab - including a new superstructure, widening the existing abutments, and associated approach roadway work 98518~|~1~|~1~|~01/SAF~|~Intersection improvement to include turn lanes, signal reconstruction and sidewalks 88905~|~1~|~1~|~01/S>2~|~Plan Split for STA SR 687 from 0.36 to 2.57. 94149~|~1~|~2~|~02/NFP~|~Plan split to cover all costs associated with culvert replacements / rehabilitations with spans less than 10 feet. 94149~|~1~|~1~|~01/NFA~|~Funding split to cover slope stabilizations, associated guardrail costs, and any other costs not covered by other funding events. 94149~|~1~|~3~|~03/NFP~|~Plan split to include all costs associated with the rehabilitate Bridge size twin culvert BUT-748-0148 (SFN 0904198). 112138~|~1~|~1~|~01/NHS~|~Replace superstructure on slab bridge JEF-7-1574 L (4100905) carrying Ramp B over SR 7 SB with new superstructure. The substructure units will be repaired. 108129~|~1~|~1~|~01/STR~|~Slide Repair on PIK CR 50 3.32 OH16-01 101940~|~1~|~1~|~01/NFP~|~Construct noise wall along US 33 east of Bowen Rd (SLM 31.04) to just past FRA/FAI county line (SLM 0.13). 122888~|~1~|~1~|~01/NFP~|~All work included in this plan split. 120703~|~1~|~1~|~01/S>2~|~Federally eligible rehabilitation work on Bunts Road 120703~|~1~|~3~|~03/NFP~|~non-federal eligible work items 120703~|~1~|~2~|~02/ENH~|~Plans split for work associated with construction of shared use path. 101380~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span. 101380~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span. 101380~|~1~|~3~|~03/S>2~|~Minor bridge work > 20' span. 116484~|~1~|~1~|~01/NFP~|~GR Project FY28. 90886~|~1~|~1~|~01/S<2~|~"01/S<2/OT/LANC" City of Lancaster project to add sidewalks curb ramps to various city street utilizing SRTS funding at 100% up to project cap. 104268~|~1~|~1~|~01/ENH~|~Constructing multiuse path in Harpersfield Township. 118357~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at MED-162-25.11/State Rd 101770~|~1~|~1~|~01/NHS~|~Replace deck edges and railing, perform hydro-demolition and place new rigid concrete overlay on twin three span concrete slab structures TUS-250-1713 L & R (SFNs 7905130 & 7905106). 116542~|~1~|~1~|~01/NHS~|~Replace bridge carrying SR 7 over Shannon's Run. In stream work is required. 99697~|~1~|~1~|~01/STR~|~Split for resurfacing work for the entire project funded at 80% federal and 20% state. 104766~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order. 121824~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing. 112469~|~1~|~1~|~01/NFP~|~Replacement of RPMs across D05. 107147~|~1~|~1~|~01/NFA~|~Improvements to the Old State Road 99636~|~1~|~1~|~01/SAF~|~Dam Removal - Safety Funds 122356~|~1~|~1~|~01/IMS~|~Tree clearing for PID 117525. 124752~|~1~|~1~|~01/STR~|~Bridge replacement. 83346~|~1~|~1~|~01/ENH~|~Enhancement - Bike Path - 1 Split - 2 priorites 82211~|~1~|~1~|~01/S<2/HEAT~|~"01/S<2/PV/HEAT" - LCATS/Local Funding 4TA7/LC05 (80% Federal) / 4BG7 (20% Local) - CAP $306,744 LCATS for Construction - Resurfacing of existing roadway with widening to accommodate the addition of turn lanes. Joint project with City of Heath and Licking County 118872~|~1~|~2~|~02/S5K~|~added plan split. 118872~|~1~|~1~|~01/STR~|~plan split STP Rural 118872~|~1~|~3~|~03/NHS~|~NHS plan split with interchange ramps 94722~|~1~|~1~|~01/CMQ~|~Construct two bike reamps from West Fifth Street to the Great Miami Trail on West Fifth Street to the east and west Great Miami River Trails. 79741~|~1~|~1~|~01/NHS~|~Double Microsurfacing ? ASD-30-3.85 (SR 511) to 5.90 (structures west of SR 60) 105722~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 92128~|~1~|~1~|~01/STR~|~Resurface SEN SR635 0.11-6.08 92128~|~1~|~2~|~02/S<2~|~SLM 0.00 to 0.11 92128~|~1~|~3~|~03/STR~|~Rural Bridge split 99819~|~1~|~1~|~01/MPO~|~Construction funding to cover full dpeth replacement of pavement, curb & gutter, driveway aprons, storm sewer, bus pads for Reed Road. 97100~|~1~|~1~|~01/ENH~|~Rehabilitation of National Roadway Bikepath under US 40 with 80% TAP/20% City funding. 97100~|~1~|~2~|~02/ENH~|~Rehabilitation of National Roadway Bikepath under US 40 with 100% City funding. 91554~|~1~|~3~|~03/NHS~|~NHS Bridge Overlay Non-eligible Over Paint Creek 91554~|~1~|~1~|~01/S<2~|~Urban paving in WCH on US-22 from SLM 7.25-10.33 (enter full WCH corp to leave corp on right) 91554~|~1~|~2~|~02/S<2~|~General system paving of US-22 from SLm 10.33-10.46 (leave corp on right to SR-753) 110764~|~1~|~1~|~01/STR~|~Landslide repair. MRG 60 21.20-21.26. 110764~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 112636~|~1~|~1~|~01/S5K~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) WAY-57-4.819 to 5.003 112636~|~1~|~2~|~02/STR~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) WAY-57-5.003 to 8.914 115266~|~1~|~1~|~01/NFA~|~Double chip sealing project on ATH CR 29 0.38-4.19. 115266~|~1~|~2~|~02/S<2~|~Double chip sealing project on ATH CR 29 0.00-0.38. 92385~|~1~|~1~|~01/NFA~|~Replace existing jack-arch bridge with a new 6X10 concrete box culvert on West Market Street. Work includes one new box culvert, concrete wing walls, railing replacement, asphalt replacement, sidewalk replacement, curb and gutter replacement, sanitary sewer replacement and water line lowering on West Market Street Section 0.07. 105219~|~1~|~3~|~03/IMS~|~1. SFN 316047 - Repair deteriorated portions of the deck wearing surface and approach slab wearing surfaces per Proposal Note 512 Type B or Type C. Only patch areas that have unsound patches or are patched with asphalt. The patches shall encompass all unsound areas that are immediately contiguous to the deteriorated area. Unsound portions of the wearing surface that are not contiguous to the existing pothole or deteriorated patch shall not be patched. (Provide 100 SF for each bridge). 2. SFN 316055 - Seal the wearing surfaces of the deck and approach slabs with Gravity Fed Resin. 105219~|~1~|~1~|~01/IMS~|~Resurfacing on the HAM-71 portion:HAM-71 SLM 0.56 to 1.17 105219~|~1~|~2~|~02/NHS~|~plan split for the resurfacing on the HAM-50 section.HAM-50: SLM 21.37-21.43 105219~|~1~|~4~|~04/IMS~|~: Replace damaged portions of damaged barrier on bridge, bridge abutment, and approach wall. 105219~|~1~|~5~|~05/SAF~|~Reflective pavement markings. 124707~|~1~|~1~|~01/SAF~|~Upgrade existing traffic signals to improve traffic flow and safety utilizing Small City (4B97) Federal funds at 95% up to CAP and 5% Local funds (LNTP). 109969~|~1~|~3~|~03/S5K~|~Systematic upgrades of signs on the Small Urban sections 109969~|~1~|~1~|~01/NHS~|~Systematic upgrades of signs on the NHS locations. 109969~|~1~|~2~|~02/S>2~|~Systematic upgrades of signs on the Large Urban locations. 109969~|~1~|~4~|~04/STR~|~Systematic upgrades of signs on the Rural locations. 122883~|~1~|~1~|~01/NHS~|~C.O. Major rehab funds, pavement and conduit work included. 122883~|~1~|~2~|~02/NHS~|~C.O. Major Rehab funds, bridge work included. 122883~|~1~|~3~|~03/SAF~|~Safety Funding. Construct an RCUT at Fry Rd. 109977~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 285 3.97. 98513~|~1~|~1~|~01/SAF~|~Cpmstruct sidewalk and install signage along Carnation Drive from Stoneybrook Road to Laurel Drive to complete sidewalk network. 114947~|~1~|~1~|~01/IMS~|~MSE Wall repair. 111169~|~1~|~1~|~01/NFA~|~ODNR Dean SF. 79766~|~1~|~1~|~01/NHS~|~Resurfacing 79766~|~1~|~2~|~02/BRO~|~Bridge workSFN: 7000243 RIC-13-5.30 105037~|~1~|~1~|~01/NFA~|~The City will construct a non-exclusive use new asphalt apron 245' x 200' in front of the new airport hangar addition. 81640~|~1~|~3~|~03/NHS~|~Work on NHS bridges, see linked bridges. 81640~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to STA SR 236 from 0.41 to 2.05, AC overlay with Repairs to STA SR 236 from 2.05 to 5.50. 81640~|~1~|~4~|~04/S>2~|~See linked structure. 81640~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to STA SR 21 from 12.39 to 17.33. Minor bridge work to SFN# 7600542. 88464~|~1~|~1~|~01/NHS~|~Polyester pavement marker program throughout District Seven 4CP7 maintenance funding does not require work locations. 100499~|~1~|~1~|~01/STR~|~PIK 220 0.00-4.07 & 9.77-10.96 100499~|~1~|~2~|~02/S<2~|~PIK 220 9.55-9.77 & 10.96-13.42 118289~|~1~|~1~|~01/SAF~|~Safety funded intersection improvement - roundabout 118289~|~1~|~2~|~02/S50~|~Culvert work not funded by safety (RIC-C0133-02265 on the south approach and RIC-C0133-02440 on the north approach) 118724~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 111415~|~1~|~1~|~01/SAF~|~Safety funded Plan split 120254~|~1~|~1~|~01/S>2~|~Construct sidewalk, ADA curb ramps, and pedestrian crossings on Hancock Ave (CR-20), Parrish Ave (MR-939), and Hensley Ave (MR-791) in the City of Hamilton to increase connectivity to Crawford Woods Elementary School. 80976~|~1~|~2~|~02/ERD~|~Mentor's 20% portion of their OH073 earmark. 100% federal pariticipation using TRC. 80976~|~1~|~1~|~01/ERD~|~Lake Metroparks' 14% portion of their OH073 earmark. 100% participation using TRC. 115350~|~1~|~1~|~01/MPO/BARB~|~Resurfacing. 110795~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using asphalt overlay treatment. HOC 56 0.00-4.41, HOC 180 0.00-0.39. Rural other federal aid funded 80 federal/20 state. 110795~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using asphalt overlay treatment. HOC 678 0.00-4.00. Not on the federal aid system funded 100% state. 110795~|~1~|~3~|~03/NFP~|~Paving the Laurelville Outpost paving lot. Funded 100% State LBM7. 105936~|~1~|~1~|~01/MPO~|~rehab/widening work eligible for federal aid 105936~|~1~|~2~|~02/NFA~|~rehab-widening work eligible for federal aid 102954~|~1~|~1~|~01/STR~|~HUR-103-6.62-7.39HUR-598-0.00-2.07RIC-598-0.00-3.86RIC-13-21.69-32.63 102954~|~1~|~2~|~02/S<2~|~HUR-103-5.52-6.62HUR-598-2.07-2.64RIC-39-17.34-18.65 102954~|~1~|~3~|~03/STR~|~RIC-13-22.25RIC-13-23.60RIC-13-25.11RIC-13-27.33RIC-598-3.33 114995~|~1~|~1~|~01/STR~|~All work in this plan split using district allocations. 80% Federal SAC 4PF7 and 20% state SAC 4PS7. 92735~|~1~|~1~|~01/ERD~|~MRG-TR21-3.66. Rehabilitation of Barkhurst Mill covered bridge. SFN 5834287. Federal/Local 80/20%. 101507~|~1~|~1~|~01/NHS~|~LOR-20 NHS Route Pavement Repairs - Reactive Maintenance 101507~|~1~|~2~|~02/IMS~|~MED-271 Interstate, Pavement Repairs - Reactive Maintenance 94130~|~1~|~2~|~02/IMS~|~Bridge maintenance on SFN 5004853 MAH US 224 19.65 over I-680 94130~|~1~|~4~|~04/NHS~|~Replacing the linked structure. 94130~|~1~|~1~|~01/NHS~|~Resurfacing MAH US 224 from 19.46 to 25.33 94130~|~1~|~3~|~03/NHS~|~Bridge maintenance on SFN 5004861 MAH US 224 18.53 over Branch of Yellow Creek, SFN 5004896 MAH US 224 20.51 over Branch of Yellow Creek. 104924~|~1~|~1~|~01/NFA~|~Bridge Brothers truck replacement project 113363~|~1~|~1~|~01/SAE~|~Connect an existing bike path located along Verity Parkway beginning at the intersection of Verity Parkway and Layfayette Avenue and terminating at the intersection of Verity Parkway and Girard Avenue to the Great Miami River Recreational Trail through City of Middletown lands and public streets. 100867~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2021 herbicidal spraying. Funded 100% state. 115496~|~1~|~1~|~01/S<2~|~SRTS project along Yoctangee Parkway in the City of Chillicothe. Project includes constructing sidewalk and enhancing 8 intersections. 98212~|~1~|~1~|~01/IMS~|~District Culvert Funding 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Lining culverts located along IR 70 and IR 77 as linked above 96407~|~1~|~1~|~01/SAF/JOHN~|~Safety Funded 4HJ7 (90% Federal) / 4BG7 (10% Local) - CAP (See Comments) - Construction of Turn lanes on US 62 in Village of Johnstown from 4.17 to 4.63 94299~|~1~|~1~|~01/NFP~|~LUC-75-4.53 joint repair. 102940~|~1~|~1~|~01/NHS~|~NHS eligible. 101411~|~1~|~3~|~03/S<2/GENE~|~Resurfacing of ATB SR 534 from 21.21 to 21.85 urban paving in the City of Geneva. 101411~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 534 from 17.04 to 18.61. 101411~|~1~|~2~|~02/S<2~|~Resurfacing ATB SR 534 from 18.61 to 19.34. 101411~|~1~|~4~|~04/S<2/GENE~|~100% City items such as full and partial depth repairs, catch basins, manholes and ADA curb ramps. 108655~|~1~|~1~|~01/NFP~|~Plan split for new noise wall construction along I-271 and repairs at 2 locations 94382~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: CRA-4-0.00-6.37 94382~|~1~|~2~|~02/S<2~|~STP < 200000 Resurfacing: CRA-4-6.37-6.72 94382~|~1~|~3~|~03/STR~|~Bridge work on CRA-SR-004-00.43 102639~|~1~|~1~|~01/NFP~|~Salt building 109613~|~1~|~1~|~01/S>2~|~Access management on Mason Montgomery Road between Escort Drive and Merten Drive. 115141~|~1~|~1~|~01/STR~|~Repair or Replace Culvert 90655~|~1~|~1~|~01/STR~|~culvert at SAN SR590 4.99-5 97643~|~1~|~1~|~01/BRF~|~SFN 3560333 97643~|~1~|~2~|~02/BRF~|~SFN 8730008 97643~|~1~|~3~|~03/BRF~|~SFN 8742596 97643~|~1~|~4~|~04/BRF~|~SFN 8742650 114765~|~1~|~1~|~01/NHS~|~BRO Double micro 82261~|~1~|~1~|~01/NHS~|~Sign Replacement 101100~|~1~|~1~|~01/STR~|~Overlay with repairs on rural route: CLA SR 54 SLM 10.00 to 11.75Overlay without repairs on rural route:CLA SR 54 SLM 6.01 to 10.00 107540~|~1~|~1~|~01/STR~|~Resurfacing HAS-342, TUS-342, HAS-800 and HAS-519 94721~|~1~|~1~|~01/S>2~|~Plan split for all work for the project using federal STP funds at 80/20. 94721~|~1~|~2~|~02/S>2~|~Split for 100% local items of work 110311~|~1~|~1~|~01/NFP~|~AC Overlay with Repair ASD-250-0.00-8.46 110311~|~1~|~2~|~02/NFP~|~Bridge work:(SFN 0304549)ASD-US-250-00.090 Preventive Maintenance: Drainage system cleaned/repaired (028) Bridge railing upgrade/repair (061) Reactive Maintenance: Deck patching(conc) (049) Exp jt repair/repl (048) (SFN 0304573) ASD-US-250-01.030Preventive Maintenance: Expansion joint repair/replacement (048) Bridge railing upgrade/repair (061) Reactive Maintenance: Exp jt repair/repl (048) (SFN 0304654) ASD-US-250-03.520 (NO WORK)(SFN 0304697) ASD-US-250-03.750 (NO WORK)(SFN 0304735) ASD-US-250-07.410Preventive Maintenance: Bridge railing upgrade/repair (061) Reactive Maintenance:Exp jt repair/repl (048) (SFN 0304751) ASD-US-250-07.550Preventive Maintenance: Bridge railing upgrade/repair (061) Reactive Maintenance: Exp jt repair/repl (048) 92819~|~1~|~1~|~01/NHS~|~Removal and replacement of the existing bridges, approach slabs, and minimal roadway work. SFN 5704596 MOT SR 49 10.73 R SFN 5704561 MOT SR 49 10.73 L 110929~|~1~|~1~|~01/NFP~|~All work in this project. 102861~|~1~|~1~|~01/NHS~|~Plan Split for NHS routes 102861~|~1~|~2~|~02/S>2~|~Plan Split for STP>200000, FRA-40, DEL-315. 102861~|~1~|~3~|~03/STR~|~Plan Split for STP Rural routes, DEL-37 108947~|~1~|~1~|~01/NFP~|~All the work in this bridge replacement project is in this plan split. Federal/State Exchange Program. 95% state funds SAC 4C87 and 5% local SAC LNTP. After the cap is reached any additional funds needed with be provided by Wyandot County. 110096~|~1~|~1~|~01/S>2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): Resurfacing-Urban Paving City of Avon LOR 0254 6.39 to 7.83 (East of Nagel Rd.) 110096~|~1~|~2~|~02/S>2~|~100% Local (Avon): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps etc.): LOR 0254 6.39 to 7.83 (East of Nagel Rd.) 101563~|~1~|~1~|~01/NFA~|~City of Wellston Bikepath. 116351~|~1~|~1~|~01/STR~|~Resurfacing SLM 13.24 to 16.54 116351~|~1~|~2~|~02/NHS~|~Resurfacing SLM 16.54 to SR 151 120113~|~1~|~1~|~01/SAF~|~Work that is federal aid eligible to enhance safety and installing sidewalks 110616~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 11 from 3.13 to 7.68 and 9.97 to 12.62. 110616~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 110616~|~1~|~3~|~03/NHS~|~Minor bridge rehab > 10' to 20' span. 98182~|~1~|~1~|~01/NFA~|~Lyons Road full service facility 117331~|~1~|~1~|~01/NFA/MCEO~|~Bridge replacement of MUS-TR00090-2.44 (SFN 6038395) carrying Wortman Road over Thompson Run. 99623~|~1~|~1~|~01/IMS~|~SFN 5704804, MOT-70-0334 Arlington Pike (C9) - Remove and replace the deficient bridge deck. Investigate semi-integral abutment conversion. Use SCC mix to patch concrete abutments, piers, and wingwalls. Seal concrete surfaces. Paint structural steel. 99623~|~1~|~2~|~02/IMS~|~The City of Brookville is paying 100% for the pylons. 99623~|~1~|~3~|~03/IMS~|~Decorative lighting to provide pedestrian safety 90644~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 122453~|~1~|~1~|~01/BRO~|~Bridge replacement 121034~|~1~|~1~|~01/S>2/HUDS~|~Railroad grade separation. 121034~|~1~|~2~|~02/S>2/NSRR~|~Railroad grade separation. 108639~|~1~|~1~|~01/NHS~|~Pedestrian improvements on Main Street and Broadway Street in downtown Lebanon. Improvements include intersection lighting, leading pedestrian intervals, high-visibility crosswalks and curb extensions. 115533~|~1~|~1~|~01/NHS~|~Landslide repair project. GAL 7 19.97. Funded 80 Federal/20 State. 115533~|~1~|~2~|~02/NHS~|~Work also includes a culvert replacement on GAL 7 20.03, CFN 1981270. 115533~|~1~|~3~|~03/NHS~|~Plan split to add a part code for the purchase of a casing. 93794~|~1~|~1~|~01/SAF~|~Safety Project on SR140 in Scioto County.On SR140, 0.65 mile north of Staten Road to 0.37 mile south of Gephart Road (7.28 to 7.80), it is proposed to perform a safety project by widening the shoulder through two curves. CC is 100% Fed Safety FundsPE is 90% Fed/10% State Safety FundsRW is 90% Fed/10% State Safety Funds01/SAF/PV/State 92860~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement 123519~|~1~|~1~|~01/STR~|~Landslide repair. 25352~|~1~|~1~|~01/S>2~|~REHABILITATE BRIDGE NOS. CLE-126-0211 AND HAM-126-2186, SFNS: 1306146 AND 3105261. 86746~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for capacity additions 86746~|~1~|~2~|~02/IMS~|~90/10 fed/state funding split for exisitng pavement replacement 96559~|~1~|~1~|~01/NHS/TALL~|~Resurfacing SUM SR 261 from 17.09 to 18.41, Urban Paving 80/20 items in the City of Tallmadge. 96559~|~1~|~2~|~02/NHS~|~100% City of Tallmadge items. 77265~|~1~|~1~|~01/IMS~|~Widen IR 76 from State Street to the IR 77 Interchange and redesign Kenmore and Battles interchanges, in the City of Akron, Summit County, Ohio. 88877~|~1~|~1~|~01/STR~|~Resurfacing ATB US 6 from 22.36 to 22.56 and 29.94 to 32.60, ATB US 6D from 0.00 to 0.06, ATB SR 7 from 14.95 to 18.42 and ATB SR 167 from 7.69 to 10.46 and 11.37 to 14.08. 88877~|~1~|~2~|~02/STR~|~See linked structures > 20' span. 88877~|~1~|~3~|~03/STR~|~See linked structures 10' to 20' span. 108743~|~1~|~1~|~01/S>2~|~Rehab and improve drainage 93901~|~1~|~3~|~03/NFA~|~Field pave the invert 93901~|~1~|~1~|~01/STR~|~Field paving the invert of various culverts all bridges under 20 feet. SFN 5403634 Mer 274 0318 SFN 5504384 MIA 571 1905 SFN 5504414 MIA 571 2021 SFN 5504503 MIA 589 0092 SFN 7500483 SHE 47 0681 SFN 7502826 SHE 119 0611 93901~|~2~|~2~|~02/STR~|~Field pave the invert of SFN 5400813 (21') 105424~|~1~|~1~|~01/IMS~|~Diamond grinding on Interstate Route: MOT IR 70 SLM 17.40 to 23.55 & CLA IR 70 SLM 0.00 to 0.51. 115808~|~1~|~1~|~01/IMS~|~Remove & replace mainline superstructure. 97439~|~1~|~1~|~01/SAF~|~Realignment of CR 51 (Baumhart Road) at CR 32 (Middle Ridge Road). 97439~|~1~|~2~|~02/SAF~|~100% Local items. 115846~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2028. 91710~|~1~|~1~|~01/BRO~|~Replacement of SFN#7700369 Major Bridge structure with two new structures (SFN#7700370 and #7700371) over the Cuyahoga river valley and located between Glenwood Avenue and Perkins Avenue, in the City of Akron, Summit County, Ohio. 91710~|~1~|~2~|~02/NHS~|~Construction of overlook and gateway aesthetic treatments on the South end of the structure near the Freedom Trail. 91710~|~1~|~6~|~06/NHS~|~Culvert replacements and repairs on SR 8. 91710~|~1~|~7~|~07/S>2~|~Culvert replacements and repairs on SR 59. 91710~|~1~|~4~|~04/NHS~|~Reconstruction of SR 8 pavement. 91710~|~1~|~5~|~05/S>2~|~Reconstruction of SR 59 (Perkins NB ramp). 91710~|~1~|~3~|~03/NHS~|~Construction of four noise walls along SR 8 within the project limits. 91710~|~1~|~8~|~08/NFA~|~Bridge hit change order 95410~|~1~|~1~|~01/IMS~|~Replace bridge deck, convert to semi-integral abutments and patch substructure. SFN 5705193 under T32 (Kimmel Road). 97471~|~1~|~1~|~01/NFP~|~Added Plan Split for funding 107721~|~1~|~1~|~01/STR~|~Slide RepairADA 781 6.60 & 7.40 95565~|~1~|~1~|~01/S<2~|~Urban system paving in the City of Dover on SR 211 from SLM 1.01 to 1.23 and on SR 800 from SLM 21.94 to 22.74; eligible items include asphalt pavement, long line pavement markings. 95565~|~1~|~2~|~02/S<2~|~Urban system paving in the City of Dover on SR 211 and SR 800; includes curb ramps (to be done in separate project by City before this project is constructed) and aux. pavement markings. 95565~|~1~|~3~|~03/NHS~|~Urban system paving in the City of Dover on NHS eligible routes including SR 211 from SLM 0.06 to 0.21 and SR 800 from SLM 20.50 to 21.94; eligible items include asphalt pavement, long line pavement markings. 107640~|~1~|~1~|~01/STR~|~Replace bridge SCI 348 6.56 (7305494) 91784~|~1~|~1~|~01/BRF~|~South D Street: from 50' south of Bridge BUT-South D St-0048 to 50' north of the bridge. SFN 0960241 Project will preserve Bridge BUT-South D St-0048, which carries South D Street over the CSX railroad. Improvements include rehabilitation of the stone abutments and wingwalls by stabilizing through encapsulation or shotcrete, drainage improvements at the foundation, replacement of beam waterproofing, and replacing the existing wearing surface. 97365~|~1~|~1~|~01/BRF~|~Bridge deck replacement project to inlcude railing, spot painting and concreate patching of abutments and piers. 106217~|~1~|~1~|~01/NHS~|~Milling and resurfacing along with repairs on Indian Ripple Road in the City of Beavercreek. 110288~|~1~|~1~|~01/STR~|~Plans split for GSM funds 104747~|~1~|~1~|~01/SAF~|~plan split 91809~|~1~|~1~|~01/STR~|~STP Rural funding for culvert work at:PIC-22-23.40 91809~|~1~|~2~|~02/NFA~|~FAY-753-3.20,FAY-753-3.90FAY-753-4.00 106687~|~1~|~1~|~01/NHS~|~Street and sidewalk reconstruction on Stimson Avenue. Begin at Grant Street and end at East State Street. Funded through the Small Cities Program. Total length of work .43 miles. 95 federal/5 local. 97659~|~1~|~1~|~01/S<2~|~Resurfacing COL-517 in Lisbon from SR 164 to SLM 2.20, including asphalt overlay and pavement markings. 97659~|~1~|~2~|~02/STR~|~Resurfacing COL-517 from SLM 2.20 to SR 7, including asphalt overlay, pavement repairs and pavement markings. 118707~|~1~|~1~|~01/STR~|~MRG SR 78-8.27 300 ft a landslide repair with drilled shafts. 108052~|~1~|~1~|~01/IMS~|~Construction inspection task order. 113883~|~1~|~1~|~01/NHS~|~Repair collapsed section of culvert under US35 via Emergency A contract 96717~|~1~|~1~|~01/NFP~|~ODNR funded project. Asphalt repair/resurfacing at VIN Rupert Lake Wildlife Area. Non federal aid project funded 100% state. 105487~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers. 100369~|~1~|~2~|~02/S<2~|~WOO-SR105 from SLM 0.94 to SLM 1.18. 100369~|~1~|~1~|~01/STR~|~SEN-162-0.58 to 9.51 & WOO-105 from 1.18 to 5.83 124691~|~1~|~1~|~01/MPO~|~Plan split for superstructure replacement of a federally eligible bridge 100501~|~1~|~1~|~01/S<2~|~ROS 50 (19.31-21.78) 116668~|~1~|~1~|~01/NHS~|~Added plan split. 93255~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on ; Not BR Eligible for Rehabilitation: Length=12 SD/FO(1) SR=64.2 DSR=" " 98703~|~1~|~1~|~01/MPO~|~Resurfacing of Olde Eight Rd from SR 303 to Boston Mills Road 106789~|~1~|~1~|~01/STR~|~SR 149 and the IR 70 eastbound on/off ramp intersection improvement. 94469~|~1~|~1~|~01/CMQ/BLUF~|~ALL-Augsburger Rd. Bikepath, 80% Federal MPO-CMAQ funds (4TB7) and 20% Local (4BG7) from the Village of Bluffton. The CMAQ eligibility was approved in an April 14, 2014 letter. 109718~|~1~|~2~|~02/S<2~|~Microsurface on:MER-29 SLM 13.22 to 15.79 109718~|~1~|~1~|~01/STR~|~Microsurface 109718~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 107120~|~1~|~1~|~01/NHS~|~Urban Paving - City of Fairborn - Lindberg to E. Dayton Drive. 107120~|~1~|~2~|~02/NHS~|~Items to be covered 100% by the City of Fairborn 92324~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH 356 1.39, SFN 0503932. Not on any federal aid system funded 80 federal/20 state. 105951~|~1~|~1~|~01/S>2~|~Resurfacing and rehab within the City of Centerville. 102196~|~1~|~1~|~01/STR~|~ADA CR 100 1.61 ER Slide repair. 115563~|~1~|~1~|~01/NFP~|~Resurfacing of Big Bend Trailhead driveway and parking lot in the Summit MetroParks district. 115519~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in ATB, MAH and TRU counties. 101976~|~1~|~2~|~02/S<2~|~For work on CR 418 from the Van Wert Urban Area boundary at CR 77 (Liberty Union Road) SLM 7.07 to the end of the project at TR 83 (John Brown Road) SLM 8.14. 80% Federal urban STP funds from the CEAO, SAC 4B77, with a 20% local match provided by Van Wert County, SAC 4BG7. Funds needed over the CEAO cap are to be provided by Van Wert County. 101976~|~1~|~1~|~01/STR~|~For work on CR 418 from CR 168 (Convory Road) SLM 2.84 to the Van Wert Urban Area boundary at CR 77 (Libery Union Road) SLM 7.07. 80% Federal rural STP funds from the CEAO, SAC 4B77, with a 20% local match provided by Van Wert County, SAC 4BG7. Funds needed over the CEAO cap are to be provided by Van Wert County. 109808~|~1~|~1~|~01/STR~|~Resurfacing on SR 613 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). 106751~|~1~|~1~|~01/BRO~|~Muni bridge work 100806~|~1~|~1~|~01/IMS~|~Bridge sealing on mainline bridges on CLI IR 71 and CLE IR 275 100806~|~1~|~2~|~02/NHS~|~Bridge sealing on mainline brigdes on CLI-73 and CLE-32 97706~|~1~|~1~|~01/ENH~|~Construction of new hike and bike trail. 92354~|~1~|~1~|~01/STR~|~Rural route. GSMP funds. Failed rock embankment. layback slopes to mitigate rockfall. 113925~|~1~|~1~|~01/S>2~|~Replace existing bridge from new rear approach slab to new forward approach slab; replace existing guardrail on both sides of the road. 106684~|~1~|~1~|~01/ENH~|~Construct bridges on existing abutments for the Moonville multi-use trail. TAP funded project. Funded 95 federal/5 local. 123917~|~1~|~1~|~01/STR~|~Slope stabilization along SR 13 and 93 in Perry County. 123917~|~1~|~2~|~02/NFA~|~Slope stabilization along SR 555 in Perry County. 102850~|~1~|~1~|~01/NHS~|~District wide Bridge Maintenance project. SCI 52 24.96 (SFN 7301561) 102850~|~1~|~2~|~02/STR~|~District wide Bridge Maintenance project. HIG 62 25.33 (SFN 3601382) HIG 62 26.20 (SFN 3601412) ROS 138 10.87 (SFN 7104081) 117879~|~1~|~1~|~01/NFP~|~Split for cracksealing work 87283~|~1~|~3~|~03/NHS/STRE~|~POR SR 14 from 1.45 to 1.71 urban paving 80/20 items in the City of Streetsboro. 87283~|~1~|~2~|~02/IMS~|~See linked structures > 20' span. 87283~|~1~|~1~|~01/IMS~|~POR IR 480 0.00 to 1.45. 87283~|~1~|~4~|~04/SAF~|~Safety improvements at POR-IR480 and SR14 interchange with Sheets Driveway. Includes installation of quick curb and pavement marking adjustments. 110154~|~1~|~1~|~01/IMS~|~Bridge repair 110154~|~1~|~2~|~02/S>2~|~Bridge repair 95857~|~1~|~1~|~01/NFP~|~at SLM 7.59 and SLM 9.85 114651~|~1~|~1~|~01/NHS~|~Project to replace and raise Wesley Rd over SR562 114651~|~1~|~2~|~02/NHS~|~Cost associated with DMS Sign replacement using TSMO funds. These funds shall be capped at $325k. See 9/19/25 email (Shell, Collett, Grake, Scanlon, Yoh, Comer, Rowe). 116677~|~1~|~1~|~01/STR~|~For resurfacing on SR 103 in Hancock County from SLM 11.39 to 16.96 & 19.03 to 23.11 96084~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for construction of a loader/equipment building at the SR 93 / SR 662 Intersection 93385~|~1~|~1~|~01/ERD~|~Construction of trailhead and amenities along the TRU-Greenway trail in the City of Warren. 96734~|~1~|~1~|~01/NHS~|~See linked structures > 20' span. 109132~|~1~|~1~|~01/NFA~|~Landslide repair project. MEG 143 11.57. 110436~|~1~|~1~|~01/SAF~|~Improve intersection of SR 161 at Karl Rd 110436~|~2~|~2~|~02/SAF~|~Columbus BMP items 119501~|~1~|~1~|~01/BRF/PRCE~|~Bridge replacement. 124663~|~1~|~1~|~01/SAE~|~Upgrade pavement markings on various Pickaway County Roads 123225~|~1~|~1~|~01/S5K~|~270' landslide repair on SR 536 at the 1.34mm. 119488~|~1~|~1~|~01/IMS~|~Landscape maintenance at various interchanges. 88618~|~1~|~1~|~01/NHS~|~Overlay SR 4 in Clark and Champaign counties with fine graded aggregate.CHP SR 4 SLM 0.00 6.97CLA SR 4 SLM 17.66 - 24.85 88618~|~1~|~2~|~02/STR~|~Bridge: CHP-29-3145 - Remove asphalt wearing surface, waterprook and overlay with asphalt concrete, remove and replace existing poly, modified expansion joints. 88618~|~1~|~3~|~03/STR~|~Overlay SR 29 in Champaign CountyCHP SR 29 31.38 - 33.96 113504~|~1~|~1~|~01/SAE~|~Guardrail replacements/upgrades on various county routes throughout Summit County. 85392~|~1~|~1~|~01/S>2~|~80/20 funding split for work eligible State STP funds 85392~|~1~|~2~|~02/S>2~|~100% local funding split 96625~|~1~|~1~|~01/NFP~|~All work is in this split. Funds from the District Preservation Program budget. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds. 124180~|~1~|~1~|~01/IMS~|~Major rehabilitation on the existing 4 lanes of PRE-70 124180~|~1~|~2~|~02/IMS~|~Plan Split for the added new lane in each direction 124180~|~1~|~3~|~03/IMS~|~Plan Split for bridge work on mainline bridges over Seven Mile Creek near SLM 5.0 101715~|~1~|~1~|~01/NFA/PCEO~|~Perry County CEAO Paving Funds - 4B77 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Resurfacing using mill & fill on CR11 (Minor Collector) from 00.00 to 09.67 114889~|~1~|~1~|~01/STR~|~Resurfacing. 114889~|~1~|~2~|~02/STR~|~Minor bridge work. 114889~|~1~|~3~|~03/STR~|~Minor bridge work. 116656~|~1~|~1~|~01/IMS~|~Plan Split for longitudinal joint repairs on a portion of CLI-71 101898~|~1~|~1~|~01/NFA~|~Canfield Township. 117930~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-E 105130~|~1~|~1~|~01/NFA~|~District Preservation 7BPB/4PS7(100% State) - See CAP Comments - Resurfacing of Per-204-00.00 to 10.00 109888~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD. Funded 80 federal/20 state. 92617~|~1~|~1~|~01/MPO~|~mill & fill 92617~|~2~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items 96353~|~1~|~1~|~01/NFP~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2014-2015 used for construction inspection services. 96189~|~1~|~1~|~01/NFP~|~Construct a loader storage facility in the Parkman Outpost in Geauga County. 124409~|~1~|~1~|~01/ENH~|~Federal items. 103492~|~1~|~1~|~01/ENH~|~Installation of decorative hardscape elements such as brick pavers, seating walls, and lighting within the intersection area of Colonel Glenn Highway and Presidential Drive. 103492~|~1~|~2~|~02/MPO~|~Plan split covers 100% city funded upgrades to the signals at the intersections of Colonel Glenn with (1) Zink Road and (2) Presidential Drive. 123913~|~1~|~1~|~01/CMQ~|~Improvements to the intersection of 6th Street and Riley Boulevard including addition of turn lanes and traffic signal improvements. Construction of a shared use path along 6th Street east from the intersection to Sunnybrook Drive to connect into the Clear Creek trail. 121368~|~1~|~1~|~01/NFP~|~plan split. 120567~|~1~|~1~|~01/ERD~|~Plan Split for RAISE eligible scope 120567~|~1~|~2~|~02/NFP~|~Plan Split for scope not eligible for RAISE grant funding, such as water and sewer line replacements 92632~|~2~|~2~|~02/MPO~|~Entered Plan Split for 100% local Items of Pavement Repair per the Stage 2 Estimate 92632~|~1~|~1~|~01/MPO~|~Entered Plan Split for Mill & Fill using Large City Funding 86013~|~1~|~1~|~01/S>2~|~Urban paving in Columbus from Brown Rd to 4th St.FRA-62 SLM 11.69-14.7901/S>2/PV/ 81085~|~1~|~1~|~01/STR~|~General system paving of PIC 316: 9.48-11.01 81085~|~1~|~4~|~04/S<2~|~Minor bridge work on 1 structure (not Br eligible):6503136 PIC SR316 11.95 Intersect: Mud Run Creek 81085~|~1~|~3~|~03/STR~|~Minor bridge work on 1 structure (not BR eligible):6503101 PIC SR316 9.84 Intersect: Scioto River # 81085~|~1~|~2~|~02/S<2~|~General system paving of PIC 316: 11.01-11.27, 11.55-14.05In Ashville S Bloomfield func class area 92411~|~1~|~4~|~04/NHS~|~Geological Site Management Funding - 4SF7 (80% Federal) / 4SS7 (20% State) - No CAP - Embankment removal along Lic-SR 16-14.34 to 14.64 92411~|~1~|~1~|~01/NHS~|~District Preservation Funding - 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comment - Replacement of 4506332 LIC SR661 0.02 Intersect: SR 661 Over SR 16; Not BR Eligible for Replacement: Length=238 SD/FO(0) SR=73.2 DSR=5 92411~|~1~|~5~|~05/ENH~|~Enhancement costs associated with bridge vandal protection fence - 100% 4BG7 (Village of Granville) 92411~|~1~|~3~|~03/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Repair and replacement on State Route 16/37/661 outside the interchange ramps and the intersection of SR 661 and Weaver/River Roads. 92411~|~1~|~2~|~02/NHS~|~LCATS & Granville CMAQ Funding - 4TB7(80% Federal) / 4BG7(20% Local) TRC Authorized - See CAP Comment - Lane widening and turn signals for the ramps and roadway between the ramps on: 1) LIC-SR 661-00.00 to 00.25; 2) LIC-SR 37-16.43-16.59; 92411~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment 85602~|~1~|~1~|~01/STR~|~JAC CR9 0.12-0.4 Keystone FurnaceOn US35 SLM 14.54 & Keystone Furnace Road (CR9). It is proposed to construct a separated grade intersection over US35. The project involves constructing a jug handle type grade separation over the 4-lane US35 @ CR9 (Keystone Furnace Rd.)/US 35 intersection. 80% Fe3d/20 split w/Jackson County providing the 20% local match. 80% on CO CC ARC (4D37) and 80% on CO CC 01 (RHB7) 85602~|~1~|~2~|~02/ENH~|~JAC CR9 0.12-0.4 Keystone FurnaceThis plan split only for enhancement portion of the project. Plan Split for Enhancement. 80/20 split w/Jackson Co. providing local match. 85602~|~1~|~3~|~03/STR~|~JAC CR9 0.12-0.4 Keystone FurnaceNew BridgeOn US35 SLM 14.54 & Keystone Furnace Road (CR9). It is proposed to construct a separated grade intersection over US35. The project involves constructing a jug handle type grade separation over the 4-lane US35 @ CR9 (Keystone Furnace Rd.)/US 35 intersection. 118616~|~1~|~1~|~01/SAE/MCEO~|~Replacement of guardrail along various county routes. 98804~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for eligible resurfacing work items. 91970~|~1~|~1~|~01/STR~|~ADA US52 0.00 - 8.27 resurfacing projectProject Description: It is proposed to resurface 8.27 miles of US52 Brdgs to be paved thru:0101648 ADA US52 1.1 Intersect: Little Three Mile Creek0101664 ADA US52 1.92 Intersect: Buzzard Roost Creek0101680 ADA US52 3.01 Intersect: Elk Run0101710 ADA US52 5.43 Intersect: Owl Hollow Stream0101745 ADA US52 6.2880/20 split 107802~|~1~|~1~|~01/NHS~|~FAY-35-4.54 to 7.42 FAY-35-11.97 to 17.39 107802~|~1~|~2~|~02/NHS~|~Bridges on FAY-35-4.54 to 7.42 and 11.97 to 17.39 SFNs: 2400448, 2400359, 2400472, 2400405, 2400413, 2400502, 2400499, 2400561, 2400553, 2400596, 2400618, 2400642 and 2400650 107802~|~1~|~3~|~03/NHS~|~Work to repair damage caused by vehicle accidents. 105133~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on BUT SR 129 15.89 to 24.00 105133~|~1~|~2~|~02/NHS~|~Funding event for bridge work. 91065~|~1~|~1~|~01/IMS~|~Minor Joint Repair and Diamond gringdin of the existing concrete pavement on MOT IR 70 from the Great Miami River Bridge (SLM 17.41) to Clark/Montgomery County Line (SLM 23.55) 86555~|~3~|~3~|~03/NHS~|~Split for 100% local items. 86555~|~1~|~2~|~02/ENH~|~Central Office Enhancement funding for shared use path 86555~|~1~|~1~|~01/MPO~|~MORPC STP funding to widen Alum Creek Drive from 2nd St to SR 317. Intersection improvements at SR 317.Local Sponsor - Columbus Airport Authority 98724~|~1~|~1~|~01/NFA~|~The city is constructing road improvements to widen and upgrade East Maple street from North Main Street to to Taft Ave. 114441~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 84402~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds 116094~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties. 84405~|~1~|~2~|~02/S>2~|~80/20 funding split for work that is eligible for State STP funds 84405~|~1~|~1~|~01/NHS~|~80/20 funding split for work on the NHS portion that is eligible for federal funds 84405~|~1~|~3~|~03/NFP~|~Split for items of work not eligible for federal funding paid at 100% local. 103083~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 145 10.03. DSR NOB-004. 100166~|~1~|~1~|~01/NHS~|~Bridge Rehab. 119195~|~1~|~1~|~01/NFP~|~Culvert replacements and repairs. 115410~|~1~|~1~|~01/S>2/Cols~|~Reconstruct signals on Rich St between Third St and Grant Ave 93286~|~1~|~2~|~02/S<2~|~General system paving in the urban func class areaDEL-37: 6.92-7.39 93286~|~1~|~1~|~01/STR~|~General system paving in the rural func class areaUNI-37: 10.01-13.95DEL-37: 0-6.92 121493~|~1~|~1~|~01/NHS~|~Superstructure replacement. 90260~|~1~|~1~|~01/NFA~|~Multi-phase project that supports the region's logistics and distribution strategy for providing multi-modal options for regional companies with new full freight rail service from the CSXT mainline to East property line of the Dayton International Airport. 90260~|~1~|~2~|~02/NFA~|~Multi-phase project that supports the region's logistics and distribution strategy for providing multi-modal options for regional companies with new full freight rail service from the CSXT mainline to East property line of the Dayton International Airport. 112588~|~1~|~1~|~01/NHS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work. 121174~|~1~|~1~|~01/NFP~|~crack sealing plan split. 117804~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/OT/NALB 98146~|~1~|~1~|~01/CMQ~|~Widening of Dayton-Xenia Road (CR-142) from East Lynn Drive to Woods Drive to provide a center two way left turn lane, addition of sidewalks along both sides of the roadway, installation of curb and gutter and storm sewer improvements. On-street parking will be investigated to mitigate parking losses resulting from the widening. 94140~|~1~|~2~|~02/S<2~|~Resurfacing of MAH SR 45 from 0.00 to 0.99. 94140~|~1~|~3~|~03/IMS~|~Minor bridge work > 20' span. 94140~|~1~|~5~|~05/STR~|~Minor bridge work 10' to 20' span. 94140~|~1~|~4~|~04/STR~|~Minor bridge work > 20' span. 94140~|~1~|~6~|~06/SAE~|~Cable Barrier guardrail on MAH IR76 (SLM 1.30 to SLM 8.64) and MAH IR80 (SLM 0.00 to SLM 1.20). 94140~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 45 from 0.99 to 11.77. 94140~|~7~|~7~|~07/IMS~|~Concrete pavement repairs on I80 from the Ohio Turnpike to I680 split. 98777~|~1~|~1~|~01/BRO~|~Change Order for Block PID 105879~|~1~|~1~|~01/S>2~|~Resurfacing including the installation of curb, gutter, sidewalk, storm infrastructure, and lighting. 116951~|~1~|~1~|~01/STR~|~WOO-18 from SLM 6.67 to 9.517 116951~|~1~|~2~|~02/NHS~|~WOO-18 from SLM 9.517 to 10.53 96360~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Bridge rehabilitation on 1) 3004937 Intersect: Over Leatherwood Creek Trib; Not BR Eligible for Rehabilitation: Length=31 SD/FO(0) SR=97.3 DSR=8; 96360~|~2~|~2~|~02/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Bridge rehabilitation on 1) 3004953 Intersect: Over Websters Run; Not BR Eligible for Rehabilitation: Length=54 SD/FO(0) SR=78.4 DSR=5; 91774~|~1~|~1~|~01/IMS~|~Four-lane concrete pavement repair project. NOB 77 6.40-11.18. Interstate route funded 90 federal/10 state. 91774~|~1~|~2~|~02/STR~|~Two-lane concrete pavement repair project. NOB 78 7.07-7.17. Funded 80 Federal/20 State. 105935~|~1~|~1~|~01/MPO~|~streetscape/multipurpose path construction eligible for federal-aid 105935~|~1~|~2~|~02/NFP~|~1005 Local items 109790~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings. 109790~|~1~|~1~|~01/IMS~|~Double micro 122862~|~1~|~1~|~01/NFA~|~Crack seal and seal coating at Buckeye Pavilion parking lot. 100988~|~1~|~1~|~01/STR~|~DSR# BEL-010 114425~|~1~|~1~|~01/BRO~|~Rehabilitate bridge carrying SR 148 over Long Run by replacing the superstructure. 99550~|~1~|~1~|~01/CMQ~|~Purchase Gantry Crane for Port of Cleveland 93728~|~1~|~1~|~01/ERD~|~Construction of trailhead and amenities along the TRU-Greenway trail. 121440~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work on WIL-6 112741~|~1~|~1~|~01/MPO~|~Resurfacing of Hopocan Ave from Hillsdale Ave to 8th St NW in the City of Barberton. 19001~|~1~|~1~|~01/STR~|~"01/STR/PV/COL" - Realign ~3,400? of CR403 from 0.3 mi N of TR802 to 0.3 mi N of TR801. Improve geometrics & intersection at TR801. Guardrail, signing, striping, 9? culvert. 123927~|~1~|~1~|~01/SAF~|~Plan Split for Abbreviated Safety funding. 104857~|~1~|~1~|~01/MPO~|~Construction of Bike lane along SR 172 in the City of Massillon. 104857~|~1~|~2~|~02/NHS~|~100% waterline work paid by Aqua Utility. 96648~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. GAL 588 6.95-7.74, 9.89-10.83. Urban other federal aid funded 80 federal/20 state. 96648~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using a microsurfacing treatment. GAL 588 0.76-6.95, 7.74-9.89. Rural other federal aid funded 80 federal/20 state. 109573~|~1~|~1~|~01/STR~|~Culvert Replacement 121238~|~1~|~1~|~01/STR~|~conduits linked 121238~|~1~|~2~|~02/STR~|~conduits linked 101578~|~1~|~1~|~01/S>2~|~Repair and resurfacing of Reading Road (US-42) from Inwood Drive to the northern Village corp. line (north of McSwain Drive). Also included is driveway reconstruction, drainage improvements, replacement of existing deteriorated concrete sidewalk, replacement of curb, and application of new pavement markings. 95814~|~1~|~2~|~02/NFP~|~on SR-184 from SLM 7.48 to SLM 10.14 non eligible urban paving items. 95814~|~1~|~1~|~01/NHS~|~on SR-184 from SLM 7.48 to SLM 10.14 urban pav from face to face of curb and 3" deep. 119884~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-C 110245~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP) - Replacement of the deficient bridge (SFN 3004058) which is BR Eligible: L=848'; SD/FO (1); DSR 4; SR 58.2 110245~|~1~|~2~|~02/ENH/CAMB~|~Local Funding - 4BG7 (100% Local) - No CAP - Repair of steps near GUE-209-8.56 bridge. 105559~|~1~|~1~|~01/STR~|~Culvert MED-SR-57 3.407 CFN 1886755 Install a spincast concrete liner. 105559~|~1~|~2~|~02/IMS~|~Split 2 for the two culverts on WAY IR 0071:WAY-IR-71 3.975 CFN 1811507  Install a spincast concrete liner or a cured in place liner.WAY-IR-71 5.492 CFN 1825281 Install a spincast concrete liner or a cured in place liner. 82977~|~1~|~1~|~01/IMS~|~Plan Split for the work on IR 71 in Clinton County from SLM 7.27 to 10.57 82977~|~1~|~2~|~02/NHS~|~Plan Split for all work on CLE-32. This routes is a NHS route. 123998~|~1~|~1~|~01/BRO~|~Replace bridge carrying US 62 over Branch of Wolf Creek. 101143~|~1~|~1~|~01/STR~|~Various bridges 111584~|~1~|~1~|~01/NHS~|~Federally eligible items. 111584~|~1~|~2~|~02/NHS~|~100% local items 93940~|~1~|~1~|~01/NFP~|~District wide long line pavement marking plan for FY 15. 100804~|~1~|~1~|~01/IMS~|~Bridge sealing on mainline bridges on IR 71 in Hamilton County 75661~|~1~|~1~|~01/BRF~|~Bridge replacement project for MEG 143 1400. SFN 5302498. 80/20% Federal/State. 116990~|~1~|~1~|~01/CMQ/STOW~|~Signal upgrades/replacements. 117010~|~1~|~1~|~01/NHS~|~Replace DEL-23-8.97 structure over Oberlander Run 117010~|~1~|~2~|~02/NHS~|~Resurface US 23 from 8.75 (SR 315 intersection) to 9.17 (just north of Meeker Way) 114089~|~1~|~1~|~01/NFP~|~Created for potential J&C involvement 124824~|~1~|~1~|~01/S50/GRAN~|~Intersection and pedestrian improvements. 121464~|~1~|~1~|~01/STR~|~plan split. 108821~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-270-52.16-52.72 94801~|~1~|~1~|~01/STR~|~Rehabilitate existing bridge to extend service life on SFN 1252372 on Spangler Road over Mad River. 122903~|~1~|~1~|~01/BRO~|~Plan split for gusset repair on Ashland 12th st bridge. 114285~|~1~|~2~|~02/IMS~|~Mowing in MOT Co. 114285~|~1~|~1~|~01/IMS~|~Mowing contract in D8 88790~|~1~|~1~|~01/SAF~|~Project consists of improving the intersection of Bridgetown (SR-264), Ebenezer, and Taylor Roads from an existing five leg intersection to a conventional four leg intersection. Improvements include the addition of turn lanes, the relocation of Taylor Rd to intersect SR-264 approximately 800 ft. southwest of the intersection, storm sewers, and curb and gutter. 88790~|~1~|~2~|~02/SAF~|~Work requested by Greater Cincinnati Water Works 106982~|~1~|~1~|~01/SAF~|~plan split 95217~|~1~|~1~|~01/STR~|~Tree Removal/Prunning - District Allocation 102799~|~1~|~1~|~01/S<2~|~Applying smooth seal to STP < 200k routes 102799~|~1~|~2~|~02/STR~|~Applying smooth seal to STP Rural routes 115436~|~1~|~1~|~01/NFP~|~Mowing 102786~|~1~|~1~|~01/IMS~|~Rehabilitated Bridge PRE-70-0632 that carries Pence Shewman Rd over I-70 by replacing the concrete deck, painting, and performing other minor repairs. Rehabilitate Bridge PRE-70-0872 which carries Monroe Central Road over I-70 by replacing the concrete deck. 119808~|~1~|~1~|~01/SAF~|~Reconstruction of Antioch Rd (CR-12) in Clinton County to increase travel lane and shoulder widths, install rumble stripes, and remove roadside hazards. 94377~|~1~|~1~|~01/ENH/Nile~|~Installation of lamp post lighting along State Route 46 in the City of Niles, Trumbull County, Ohio. 98325~|~1~|~1~|~01/SAF~|~80% federal with 20% local match for SRTS eligible work items. 113009~|~1~|~1~|~01/STR~|~Project to paint various bridges in Butler and Hamilton County 91852~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601539 COS SR79 3.94 Intersect: Winding Fk Of Wakatomk Cr; BR Eligible for Replacement: Length=39 SD/FO(1) SR=36.3 DSR=4; 91852~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601474 COS SR79 1.6 Intersect: Winding Fk Of Wakatomk Cr; Not BR Eligible for Replacement: Length=80 SD/FO(0) SR=72.8 DSR=5; 91852~|~3~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601563 COS SR79 8.34 Intersect: Mohawk Creek; BR Eligible for Replacement: Length=43 SD/FO(1) SR=39.3 DSR=5; 91852~|~4~|~4~|~04/STR~|~"04/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601598 COS SR79 9.55 Intersect: Trib Of Mohawk Creek; Not BR Eligible for Replacement: Length=49 SD/FO(0) SR=60.1 DSR=5; 103159~|~1~|~1~|~01/S>2~|~Widening of CR 25 A SLM 3.54 to 4.10 103159~|~1~|~2~|~02/S>2~|~New Signal Installation. 116282~|~1~|~2~|~02/STR~|~Culvert replacement on MEG 681 3.87 (CFN 1881079). Funded 80 Federal/20 State. 116282~|~1~|~1~|~01/STR~|~Landslide remediation of 7 landslide between Meigs SR 681 3.21 and 3.80. 119581~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 116693~|~1~|~1~|~01/STR~|~All work is in this plan split. 119278~|~1~|~1~|~01/STR~|~Replace MRW-19-6.43 structure (SFN 5900182) over Whetstone Creek 118751~|~1~|~1~|~01/MPO/STPK~|~Middlebranch Trail resurfacing. 98869~|~1~|~1~|~01/NHS~|~Replacing sidewalks on US 224 (E Main St) from Broad St to Hillside Rd in the City of Canfield. 90660~|~1~|~2~|~02/NFP~|~SFN 4831713 Sylvania Ave bridge over Ottawa River. 90660~|~1~|~1~|~01/MPO~|~LUC CR5 10.1-11.16 (Sylvania Ave) 104327~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work on the urban STP system 104327~|~1~|~2~|~02/STR~|~Split 2 for rural STP resurfacing 94267~|~1~|~1~|~01/MPO~|~Phillips/Willy 105639~|~1~|~1~|~01/STR~|~Plan Split for bridges FRA-665-3.26 and MAD-665-5.53 114811~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items. 91934~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint. Funds for 2 year mowing contract 96783~|~1~|~3~|~03/NFA~|~Culvert Repair: RIC-30-15.37 (Under Laver Rd.) CFN 1864899 96783~|~1~|~1~|~01/STR~|~Culvert Repair: ASD-42-16.87. CFN 1803888. 96783~|~1~|~2~|~02/IMS~|~Culvert Repair: ASD-71-0.67. CFN 1803915 123340~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project on WAS CR 344. 120590~|~1~|~1~|~01/NFA/LCEO~|~Replacement of bridge along Dutch Cross Road (TR 56). 107178~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete and install ADA compliant curb ramps at the intersections. 102981~|~1~|~1~|~01/NHS~|~Smooth seal on NHS routes: MOT SR 725 SLM 15.26 to 18.18 & MOT SR 741 SLM 1.00 to 3.17. 109655~|~1~|~1~|~01/STR~|~Resurfacing CAR-332 and HAS-332 97678~|~1~|~1~|~01/NFA~|~Replace gas lines at the District Headquarters. 101166~|~1~|~1~|~01/IMS~|~Plan Split for Work on Interstate 98197~|~1~|~1~|~01/NFP~|~District Preservation Program - 4PS7 (100% State) - No CAP - Various routes in Knox, Licking, Fairfield, and Perry Counties. 116527~|~1~|~1~|~01/NHS~|~Resurfacing. 88506~|~1~|~1~|~01/SAF~|~Safe Routes to School funding for curb extensions at Town/Hawkes and Town/Avondale intersections 102202~|~1~|~1~|~01/STR~|~LAW CR 4 4.75 ER slide repair 88859~|~1~|~1~|~01/S<2~|~Bridge Replacement 124908~|~1~|~1~|~01/SAF~|~Reflective Pavement Marking project for FY2032. 118888~|~1~|~1~|~01/STR~|~Resurfacing SR 164 from SR 518 to SLM 14.26 112853~|~1~|~1~|~01/NHS~|~NHS Plan Split: UNI-42-0.00-4.43 110187~|~1~|~2~|~02/CMQ/YTWN~|~Signal upgrade at 17 locations throughout the City of Youngstown 110187~|~1~|~1~|~01/S>2~|~Resurfacing and streetscaping, possible road diet on 5th Avenue, includes installation of a landscaped median, drainage improvements, upgrade street lighting, curbing and sidewalk replacements, upgrade curb ramps to current ADA standards, 110187~|~2~|~3~|~03/S>2/YTWN~|~Resurfacing and streetscaping, possible road diet on Rayen, Phelps, Federal, Park, Front, Commerce streets, includes installation of a landscaped median, drainage improvements, upgrade street lighting, curbing and sidewalk replacements, upgrade curb ramps to current ADA standards 110187~|~3~|~4~|~04/S>2/YTWN~|~Autonomous vehicle shuttle. 105239~|~1~|~1~|~01/STR~|~Ac overlay 116333~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban portions of HAM-128 116333~|~1~|~2~|~02/STR~|~Plan Split for the rural portion for HAM-128 103497~|~1~|~1~|~01/STR~|~ER event OH16-01 DSR# BEL-001 104085~|~1~|~1~|~01/BRF~|~Bridge replacement. 110333~|~1~|~1~|~01/SAE~|~100% Safety funded Guardrail replacement 92465~|~1~|~1~|~01/IMS~|~8703426 WOO IR75 9.92 Intersect: Portage River Middle Br 8703450 WOO IR75 9.92 Intersect: Portage River Middle Br 114562~|~1~|~1~|~01/STR~|~AC Overlay with Repairs. 114562~|~1~|~2~|~02/NFA~|~Resurface existing pavemet 91434~|~1~|~1~|~01/NHS~|~Bridge repair project. GAL 7 0248 (SFN 2700158), GAL 7 0323 (SFN 2700182), and GAL 7 0202 (SFN 2700123). NHS route funded 80 federal/20 state. 91434~|~1~|~2~|~02/NHS~|~Culvert replacement on GAL 7 2.49-2.51. NHS route funded 80 federal/20 state. 117068~|~1~|~1~|~01/NHS~|~Added plan split. 119057~|~1~|~1~|~01/STR~|~All work included in this split. 76467~|~1~|~1~|~01/IMS~|~Minor pavement rehab from FRA-270-21.69 to 24.56 and FRA-315-10.61 to 12.54 76467~|~1~|~2~|~02/IMS~|~Minor bridge work (patching, sealing) on 7 bridges 116894~|~1~|~1~|~01/MPO/ALLI~|~Resurfacing. 87120~|~1~|~2~|~02/NHS~|~Seal bridge HAM-50-2138R 87120~|~1~|~1~|~01/IMS~|~Bridge seal for HAM-71-0110 107986~|~1~|~1~|~01/NFP~|~VGCS bridge maint. 114070~|~1~|~1~|~01/NHS~|~Bridge Painting Plan Split 109348~|~1~|~1~|~01/NFP~|~ODNR resurfacing project in Tar Hollow State Forest. 115701~|~1~|~1~|~01/STR~|~Pavement items and miscellaneous items associated with resurfacing 115701~|~1~|~2~|~02/STR/WAL~|~Pavement Repairs 101762~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - Plan Split 1 101762~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - Plan Split 2 101762~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - Plan Split 3 101762~|~1~|~4~|~04/S<2/ZANE~|~"04/S<2/PV/ZANE" - Plan Split 4 114102~|~1~|~1~|~01/SAF~|~SR31 widening from Elwood Ave to US33 eastbound ramp intersection, including traffic signal upgrades and pedestrian improvements. 114102~|~1~|~2~|~02/ENH~|~Bicycle and Pedestrian facilities 99916~|~1~|~1~|~01/SAE~|~100% CEAO HSIP for new guardrail on various county roads 101443~|~1~|~1~|~01/STR~|~Stream restoration. ATH 690 0.75. DSR ATH-003. 109191~|~1~|~1~|~01/NFP~|~POR TID construction of Chestnut Commerce Center Industrial Park road. 97196~|~1~|~1~|~01/BRF~|~Ped covered bridge bridge. No SFN assigned. 110675~|~1~|~1~|~01/STR~|~Resurfacing. 110675~|~1~|~2~|~02/S5K~|~Resurfacing. 105659~|~1~|~1~|~01/STR~|~Plant Split for Runal UNI-4 bridge 97466~|~1~|~1~|~01/NFA~|~Local Shared Use Path 94366~|~1~|~1~|~01/SAF~|~Construction of 8.62 miles of cable rail barrier on Nelsonville Bypass with colored concrete mowstrip and soil renovation with reseeding. ATH US 33 0.00-3.79 and HOC US 33 0.00-4.08. Funded 100% bonds. 101129~|~1~|~1~|~01/STR~|~STP Rural Resurfacing 121236~|~1~|~1~|~01/STR~|~Plan split for chip seals 104032~|~1~|~1~|~01/NFA~|~Guardrail replacement project on various routes and sections in MEG Co. Funded 100 federal. 114924~|~1~|~1~|~01/S>2~|~Resurfacing. 112933~|~1~|~1~|~01/NHS~|~NHS Plan Split: FRA-315-2.57-5.18 107130~|~1~|~1~|~01/CMQ~|~Construction of a roundabout at the intersection of Pfeiffer Road and Deerfield Road. 94653~|~1~|~1~|~01/NFP~|~Local park roads - Glacier Ridge Metro Park 120759~|~1~|~1~|~01/SAE~|~single-lane roundabout at SR-3 and SR-162 West / Cobblestone Park Dr (Montville TR-0837). 120759~|~1~|~2~|~02/S>2~|~South bound right turn lane. 120288~|~1~|~1~|~01/MPO~|~Federally eligible items. 106419~|~1~|~1~|~01/SAF~|~GR Upgrades 121602~|~1~|~1~|~01/CMQ/CANT~|~Construct new roundabout. 88691~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete on US 42 from the East Corporation Limit of the Village of South Charleston (SLM 6.29) to CLA/MAD County Line (SLM 10.07) 24970~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during scoping. 97973~|~1~|~2~|~02/IMS~|~Plan Split for District Bridges HAM-75-0022L and HAM-75-0030. 97973~|~1~|~1~|~01/IMS~|~Plan split for all Major Bridges HAM-71-0000L, HAM-71-0000R, and HAM-75-0022R. 101340~|~1~|~1~|~01/NHS~|~Bridge rehab. 120732~|~1~|~1~|~01/CMQ~|~Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley View Ln. 103013~|~1~|~1~|~01/S<2~|~resurfacing from 0.00 to 0.43 (N. Johanna Drive) and 0.72 (Lake Glen Court) to 1.04 103013~|~1~|~2~|~02/S<2~|~resurfacing from 0.43 to 0.72 (N. Johanna Drive to Lake Glen Court) 101996~|~1~|~1~|~01/NFP~|~Mowing 93013~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Work on Lic-70-2015 and dck sealing on the remainder of the bridges 93013~|~1~|~3~|~03/SAF~|~District 5 Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - See CAP Comment - For widening of the IR 70 EB ramp to SR 13 93013~|~1~|~1~|~01/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on selected Interstate segments 93013~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment 97030~|~1~|~1~|~01/NHS~|~SCI US 52 21.84 112416~|~1~|~1~|~01/STR~|~On CR 29 pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program and OPWC (4BG6) funds. 112416~|~2~|~2~|~02/STR/HAS~|~100% LNTP 87284~|~1~|~1~|~01/NHS~|~See linked structures >20' span. 87284~|~1~|~2~|~02/NHS~|~Catch basin reconstruction. 113097~|~1~|~1~|~01/STR~|~Bridge plan split 113097~|~1~|~2~|~02/STR~|~Plan split for WIL-191-0574 bridge replacement 86047~|~1~|~1~|~01/BRF/TORO~|~"01/BRF/BR/Toro" - Toronto; replace the existing bridge on existing alignment, carrying Titanium Way over Jeddo Run and Jeddo Run Road (Lynn Drive.) 0.1 Mile South of Intersection Franklin Ave. Construct approximately 400? of sidewalk adjacent to curb along the west side of the road and on the bridge, beginning at the parking lot of Titanium Metals and ending at the existing sidewalk at Valley View Place. Also improve Titanium Way/Franklin Avenue Extension intersection by increasing the radii to better accommodate trucks. 100378~|~1~|~1~|~01/STR~|~Work on SR 697 from the beginning of the route at SR 116 to the Delphos Urban Area boundary at the bridge over West Jennings Creek at 5.49. Federal and state funds from the District Preservation Program budget. No local funds. 100378~|~1~|~2~|~02/S<2~|~Work on SR 697 from the Delphos Urban Area boundary at the bridge over West Jennings Creek at 5.49 to the west corportation limits of the City of Delphos at 6.58. Federal and state funds from the District Preservation Program budget. No local funds. 115657~|~1~|~1~|~01/BRF~|~Replacement of SFN 4930053 123210~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 88635~|~1~|~1~|~01/S>2~|~D6 funding for general system two lane resurfacing 102769~|~1~|~1~|~01/NHS~|~This plan split is for work on NHS bridges. 116185~|~1~|~1~|~01/S<2~|~Bridge Replacement 101327~|~1~|~1~|~01/NHS~|~Structure replacement. 101327~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 123774~|~1~|~1~|~01/BRO~|~Bridge Replacement 92692~|~1~|~1~|~01/STR~|~This is for the portion of the project outside the Van Wert Urban Area. SR 116 from SR 117 slm 2.51 to the Van Wert Urban Boundary at 17.80. All funds from the District Preservation Program. 92692~|~1~|~2~|~02/S<2~|~This is for the portion of the project inside the Van Wert Urban Area. SR 116 from the Van Wert Urban Area boundary at 17.80 to end of the project at the Middle Point Road at 18.15. All funds from the District Preservation Program. No local funds. 92692~|~1~|~3~|~03/NFA~|~This is for the portion of the project on SR 116 in Van Wert County from the Auglaize County line at 0.00 to SR 117 at 2.01. This section of SR 116 is classified as a Rural Minor Collector and not eligible for federal funds. All funds are from the District Preservation Program budget. 101405~|~1~|~1~|~01/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - Bridge Cleaning and Sweeping on Interstate Routes 101405~|~1~|~2~|~02/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on NHS Routes 101405~|~1~|~3~|~03/S<2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Urban Routes 101405~|~1~|~4~|~04/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Rural Routes 101405~|~1~|~5~|~05/NFA~|~District Preservation Bridge Program - 4PS7 (100% State) - Bridge Cleaning and Sweeping on NOFAS-Rural Routes 111023~|~1~|~1~|~01/BRO~|~Bridge replacement project. VIN 124 5.09, SFN 8201293. On system eligible funded 80 federal/20 state. 117578~|~1~|~1~|~01/NFA~|~This plan split includes all work required for the project 109925~|~1~|~1~|~01/S<2/HEAT~|~LCATS STP Funding - 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Resurfacing and related roadway work on CR 343 and CR 301 in the City of Heath. 109925~|~1~|~2~|~02/S<2/NEWA~|~LCATS STP Funding - 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Resurfacing and related roadway work on CR 301 in the City of Newark. 97289~|~1~|~1~|~01/SAF~|~FY2019 District wide raised pavement markers. 85376~|~1~|~1~|~01/STR~|~Replace culvert at SEN SR587 10.65-10.66 109336~|~1~|~1~|~01/NFP~|~ODNR resurfacing project at Strouds Run State Park campground 84528~|~1~|~3~|~03/NHS~|~Funding Split for NHS contract for the following bridges: HAM-50-0800 HAM-126-1906 84528~|~1~|~2~|~02/STR~|~Funding Split for STP Rural includes the following bridges: BUT-73-0471 PRE-127-1051 WAR-350-0285 84528~|~1~|~4~|~04/S>2~|~Construction Funding split for STP Urban areas > 200k population for the following bridges: HAM-42-0000 WAR-42-1043 84528~|~1~|~1~|~01/IMS~|~Interstate Maintenance Construction Funding event to cover the following bridges: HAM-71-0752 GRE-675-1600L, GRE-675-1600R, HAM-275-1070R, HAM-275-1080L, HAM-275-1080R, HAM-275-1080S, HAM-74-1116L, & HAM-74-1116R. 124702~|~1~|~1~|~01/S50~|~Cedar Point Drive Paving Project from Cleveland Road to First Street. 94629~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO Enhancement funds to be used on Fleet Avenue for minor rehabiliation and new streetscape elements. 82050~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 114623~|~1~|~1~|~01/MPO~|~This plan split includes all work necessary to construct the project 114623~|~1~|~2~|~02/MPO~|~FY24 Urban Paving Project in the City of Lebanon on US-42 from Glosser to SR 123, on Main Street (SR-48) from US-42 to SR-48 interchange, and on SR-123 from SR-48 interchange to the eastern corp. limit. 117922~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-76-A 120273~|~1~|~1~|~01/S5K~|~Bridge deck replacement project. HOC 93 12.48 (SFN 3702162). 115711~|~1~|~1~|~01/SAF~|~2023/2024 Traffic Signal Maintenance 92029~|~1~|~1~|~01/NFA~|~Salt Dome 92571~|~1~|~1~|~01/STR~|~Funding for the entire project in Middlefield Village and Middlefield Twp. at 80% federal and 20% state 92571~|~1~|~2~|~02/STR~|~100% local participation for the ADA curb ramp construction and paving of the parking lanes. 116353~|~1~|~1~|~01/NHS~|~Resurfacing US 22 and SR 7 99757~|~1~|~1~|~01/NFA~|~Bridge Replacement SFN 4631838 119453~|~1~|~1~|~01/NFA~|~Created for J&C involvement 94670~|~1~|~1~|~01/IMS~|~Repair slip failure 101170~|~1~|~2~|~02/NHS~|~Microsuface: CHP US 68 1.82 to 5.03 101170~|~1~|~1~|~01/IMS~|~Double micro on Interstate route: CLA IR 70 SLM 20.85 to 25.11 123528~|~1~|~1~|~01/NFA~|~Major preventative Maintenance of Suspension Bridge Road bridge (SFN 3134202) under Local Major Bridge Program. 123425~|~1~|~1~|~01/NHS~|~Resurfacing US 30 and SR 39 87374~|~1~|~1~|~01/BRO~|~Replacing deficient deck with minimal approach work on Bridge SFN 5500893 MIA 48 0359 over Sotzing Ditch. 102752~|~1~|~1~|~01/S>2/NILE~|~Resurfacing, urban paving in the City of Niles. 102752~|~1~|~3~|~03/S>2~|~Minor bridge work. 102752~|~1~|~2~|~02/S>2/NILE~|~100% Niles items including ADA curb ramps, full and partial depth pavement repairs and catch basin reconstruction. 118891~|~1~|~1~|~01/BRF/CANT~|~Bridge rehabilitation. 93826~|~1~|~1~|~01/STR~|~resf 103195~|~1~|~1~|~01/IMS~|~Split for pavement markings on the interstate system 103195~|~1~|~2~|~02/NHS~|~Split for work on the NHS routes. 103195~|~1~|~3~|~03/S>2~|~Split for work on the urban STP routes. 103195~|~1~|~4~|~04/STR~|~Split for work on the rural STP routes. 90632~|~1~|~1~|~01/NFP~|~This is a guardrail contract using maintenance operating funds (4CP7) capped at $750,000. Any expenditures over that amount will use 4PS7. 98366~|~1~|~1~|~01/MPO~|~Resurfacing East Mennonite Road from approx 2,500 ft East of Page Road to Aurora East Corp Line in the City of Aurora, includes some full depth repairs. 115811~|~1~|~1~|~01/STR~|~D03 PR FY2023, 1 Year Contract. 120123~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 123543~|~1~|~1~|~01/NFP~|~plan split for PM 90937~|~1~|~1~|~01/NFA~|~SIDEWALKS 107212~|~1~|~1~|~01/ENH~|~Sidewalk replacement along Harmon Ave in the City of Warren. 107212~|~1~|~2~|~02/NFP/Warr~|~Resurfacing of Harmon Avenue in the City of Warren, Trumbull County, Ohio. 97913~|~1~|~1~|~01/STR~|~Culvert replacement project. Work includes adding retaining walls. MOE-145-12.95 (CFN 1824660). Rural other federal aid funded 80 federal/20 state. 97913~|~1~|~2~|~02/S<2~|~Culvert replacement project. Work includes adding retaining walls. MOE-536-1.24 (CFN 1828270) and 1.36 (CFN 1824238). Urban other federal aid funded 80 federal/20 state. 100624~|~1~|~2~|~02/NHS~|~Crack sealing for US 22 and SR 7 at Steubenville 100624~|~1~|~3~|~03/STR~|~Crack sealing SR 39 100624~|~1~|~1~|~01/IMS~|~Crack sealing of pavement within District 11 on interstate routes 109725~|~1~|~1~|~01/STR~|~AC Overlay without repairs 109725~|~1~|~2~|~02/S<2~|~AC overlay without repairs 106817~|~1~|~1~|~01/STR~|~Culvert Replacement 117899~|~1~|~1~|~01/NFP~|~Added a split for non-federal bridge work 119515~|~1~|~1~|~01/SAF~|~Safety Items 95542~|~1~|~1~|~01/NHS~|~A new entrance to Terra Community College 95542~|~1~|~2~|~02/NHS~|~SFN 7200420 110042~|~1~|~1~|~01/NFA~|~Culvert replacement project. MOE 260 8.51, CFN 1863326. Funded 100% state. 110042~|~1~|~2~|~02/STR~|~Culvert replacement/repair project. NOB 147 6.39 (CFN 1800752), NOB 339 7.97 (CFN 1828548) and WAS 550 14.04 (CFN 1810146). Rural other federal aid funded 80 federal/20 state. 104619~|~1~|~1~|~01/MPO~|~Resurfacing East Market Street from Main St to SR 82 Interchange. 109187~|~1~|~1~|~01/NFP~|~Install new water line at the District Headquarters 117103~|~1~|~1~|~01/MPO~|~Resurfacing. 86939~|~1~|~2~|~02/STR~|~Sealing SFN 7801483 TRU-SR 5-31.14 over Pymatuning Creek, SFN 7801505 TRU-SR 5-32.56 over Stratton Creek, SFN 7801521 TRU-SR 5-33.68 over Maple Creek, Asphalt Bridge Deck Overlay and Paint SFN 7805535 TRU-SR 87-15.15 over SR 11, Asphalt Bridge Deck Overlay SFN 7805551 TRU-SR 87-19.63 over Clear Creek, Concrete Bridge Deck Overlay, Concrete Patching and Painting of SFN 7805586 TRU-SR 87-20.63 over Pymatuning Creek. 86939~|~1~|~1~|~01/STR~|~Resurfacing TRU-SR-5 from 30.96 to 35.52 and SR 5D from 0.00 to 0.06, TRU-SR-7 from 14.28 to 17.04, TRU-SR87 from 13.42 to 22.36. Trumbull County, Ohio. 93753~|~1~|~1~|~01/STR~|~01/STR/BR ; HAR-53-1055, SFN 3300455; 80% Fed (4PF7) - 20% State (4PS7) - No Cap 111313~|~1~|~1~|~01/STR~|~ResurfacingADA CR 2 (4.39-6.23)ADA CR 10 (0.00-5.13) 98204~|~1~|~1~|~01/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on GUE-70-17.50 to 23.60 and GUE-70-25.30 to 28.48 98204~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on LIC-16-24.58 to 28.70 and MUS-16-0.31 to 6.41 98204~|~1~|~3~|~03/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban LIC-37-16.59 to 17.29 and MUS-40-5.10 to 9.15 98204~|~1~|~4~|~04/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural LIC-40-28.58 to 29.93, LIC-40-29.93 to 30.14, LIC-37-17.29 to 24.42, MUS-40-0.00 to 1.08, and MUS-40-1.08 to 5.10 98204~|~1~|~5~|~05/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes in FAI-312-0.00 to 3.75, HOC-312-0.00 to 0.40, and PER-312-0.00 to 4.99 106343~|~1~|~1~|~01/NFA~|~Safety Assemblies, Coordinator, Crossing Guard Equipment, Incentives, Bike Helmets 99583~|~1~|~1~|~01/NHS~|~Resurfacing using 80% federal and 20% state funds. 109065~|~1~|~1~|~01/NHS~|~District 5 Geological Site Management Funded Program - 80% Federal (4SF7) / 20% State (4SS7) - See CAP Comment - slide repair on GUE-22-14.60 105554~|~1~|~1~|~01/NHS~|~Highway Lighting 101543~|~1~|~1~|~01/BRF~|~CEAO funded bridge rehab. 101543~|~1~|~2~|~02/BRF~|~Bridge Beam 101543~|~1~|~3~|~03/BRF~|~Bridge Beam 110582~|~1~|~1~|~01/STR~|~MRW 95 and 95A within the Villages of Mt. Gilead and Edison 110582~|~1~|~3~|~03/STR/EDIS~|~100% Local Items within the Village of Edison 110582~|~1~|~2~|~02/STR/MTGI~|~100% Local Items within Village of Mt. Gilead 90083~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/OT/KCEO" - County Engineer's Association Organization Pavement Marking 4HB7(100% Federal Safety Funding)- CAP of $750,000.00 federal - Pavement Marking on routes to be determined 105068~|~1~|~1~|~01/NFA~|~plan split 84485~|~1~|~1~|~01/NHS~|~Plan split for all non-interstate work ON GRE-35 84485~|~1~|~2~|~02/NHS~|~This plan split is for work on NHS bridge. 121127~|~1~|~1~|~01/STR~|~Resurfacing SR 39 87469~|~1~|~1~|~01/IMS~|~100% state funding for all repair work. Locations TBD. 87469~|~1~|~2~|~02/IMS~|~Plan split for rail upgrading at 90/10 fed/state. 87469~|~1~|~3~|~03/STR~|~80/20 fed/state split for guardrail upgrade along SR-528 in Lake County 99612~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work. 99920~|~1~|~1~|~01/STR~|~80% CEAO CSTP funding to resurface CR 35 and CR 137 99920~|~1~|~2~|~02/STR~|~100% local items 122471~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 94479~|~1~|~1~|~01/NFA/CJAC~|~On Harding Ave., in the City of Jackson, it is proposed, to replace the municpal bridge over Little Salt Creek.Municipal Brdg Program80% Fed/20% local match01/NFA/BR/CJAC 84606~|~1~|~1~|~01/STR~|~Resurfacing of US322 from SLM 8.11 to SLM 17.47in Orwell, Colebrook, and Wayne townships, Ashtabula County, Ohio. 84606~|~1~|~2~|~02/STR~|~Structure work, NOT BR eligible: SFN 0406325 9.66 US322 over Rock Creek.SFN 0406368 13.56 US322 over Mosquito Creek.SFN 0406392 13.99 US322 over Mosquito Creek.SFN 0406406 15.02 US322 over ATB SR11 2.49.SFN 0400718 18.10 SR7 over East Branch Ashtabula River. 105464~|~1~|~1~|~01/IMS~|~Repair of two structures FRA-70-7.964 and FRA-71-21.901 105464~|~1~|~2~|~02/NHS~|~Repair of structure FAY-35-16.613 121073~|~1~|~1~|~01/S5K~|~Resurfacing SR 170 87371~|~1~|~1~|~01/BRF~|~Bridge replacement project. Work includes removal of superstructure and selective demolition of piers, abutments and substructure. Replacement to include widening to new standards. GAL CR 20 9.37 SFN 2734109. 80% Federal and 20% Local with some Credit Bridge. 110557~|~1~|~1~|~01/STR~|~ROS-138-10.38 Bridge Replacement 124006~|~1~|~1~|~01/NFA~|~Created For J&C Involvement. 97366~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7. 110156~|~1~|~1~|~01/STR~|~Bridge repair - bridge <20' 110156~|~1~|~2~|~02/STR~|~Bridge repair - bridges >20' 110156~|~1~|~3~|~03/IMS~|~Bridge repair 110156~|~1~|~4~|~04/NHS~|~Bridge repair. 98728~|~1~|~1~|~01/NHS~|~Guardrail replacement and signal coordination 98728~|~1~|~2~|~02/NHS~|~Pavement repair and resurfacing paid with local funds - City of Elyria 107804~|~1~|~1~|~01/STR~|~MAD-38-0.00 to 11.92 107804~|~1~|~2~|~02/S<2~|~MAD-38-11.92 to 12.41 107804~|~1~|~3~|~03/STR~|~Federal Bridges on MAD-38, SFNs: 4900251 and 4900324 120211~|~1~|~1~|~01/MPO~|~SRTS items. 88919~|~1~|~1~|~01/BRO~|~Replace existing twin CMP pies (CAR-542-1060, SFN 1002015) with a four-sided box. 83959~|~1~|~1~|~01/STR~|~Construction of Plug pike wall to repair channel erosion at 8.73 mm to the slope 100757~|~1~|~1~|~01/STR~|~Resurfacing project on MEG SR 733 0.25-2.25 other Federal aid route Rural 80/20% Federal/State funds. 111395~|~1~|~1~|~01/NFP~|~Created for J&C Involvement 123193~|~1~|~1~|~01/STR~|~geotech plan split. 115100~|~1~|~1~|~01/S<2~|~Slide repair 97985~|~1~|~1~|~01/IMS~|~Priority System minor rehabilitation of TUS-77 including asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, and pavement marking. 114073~|~1~|~1~|~01/SAF~|~Plan Split for federally eligible construction related expenses 106525~|~1~|~1~|~01/IMS~|~test 105651~|~1~|~1~|~01/NHS~|~NHS Non-Interstate Bryan Bridges. (HEN6-11.51 & 11.80) 105651~|~1~|~2~|~02/NHS~|~NHS Rural Bridges HEN-6 16.49,16.78; HEN-24 11.39, 11.40, 12.89, 13.82, 13.83, 15.71, 15.72. 105651~|~1~|~3~|~03/STR~|~STP Rural FUL-20 2.53; HEN-18 13.86; HEN-65 1.35, 18.28; HEN-66 4.82; HEN-108 8.25, 8.74; WIL-2 11.82; WIL-15 0.13; WIL-34 26.60, 27.16; WIL-49 2.63, 20.02; WIL-107 8.02; WIL-576 2.08, 2.97, 11.80, 14.28. 105651~|~1~|~4~|~04/S<2~|~STP<2k; Bryan bridges WIL-2 8.89 & WIL-34 15.67 92805~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using asphalt overlay treatment on MRG 607 0.00-0.70 and 1.35-1.75. Not on federal aid, minor collector. 100% state funded. 105005~|~1~|~1~|~01/MPO~|~Multi-Purpose Trail, NOACA funded 97192~|~1~|~1~|~01/NFP~|~Ohio's share of the spot painting project. 97192~|~1~|~2~|~02/NFP~|~KYTC's Share of the spot painting project. 97511~|~1~|~1~|~01/S<2~|~Bridge replacement project. HOC-MOHIO-20, SFN 3731057 (Ohio Avenue). CEAO funded. Funded 80 federal/20 local. 120775~|~1~|~1~|~01/IMS~|~Bridge deck epoxy overlay 98547~|~1~|~1~|~01/NHS~|~All costs associated with structure HAM-42-1198 99413~|~1~|~1~|~01/STR~|~Resurface approx 6.5 miles of CR 4 from the Hopedale north corp to SR 646. 124605~|~1~|~1~|~01/SAF~|~safety funded roundabout work at WAR-22 & Clarksville and CLI-22 & SR-380/Creek Rd 111242~|~1~|~1~|~01/ENH~|~Funding to cover construction of bike trail 123808~|~1~|~1~|~01/STR~|~stp rural 92364~|~1~|~1~|~01/NHS~|~resurface LUC SR 2 27.80 - 34.05 - N. Curtice Rd to Ottawa Co. Line 124868~|~1~|~1~|~01/NFP~|~Districtwide systematic lighting upgrades and maintenance. 91579~|~1~|~1~|~01/BRO~|~Deck Replacement. 4402049 LAW SR140 0.82 Intersect: Hales Creek80 Fed/20 State. 01/BRO/BR/State 111578~|~1~|~1~|~01/IMS~|~Noise wall maintenance. 88316~|~1~|~1~|~01/CMQ~|~Project involves the widening of North Fairfield Road (CR-9) to three (3) lanes, the installation of curb and gutter, installation of storm sewer, and addition of a bikeway along the east side of the roadway. 93820~|~1~|~1~|~01/S>2~|~Resurfacing of North Main Street (SR91) in the City of Hudson from State Route 303 to Clinton/Aurora Streets. 91549~|~1~|~1~|~01/STR~|~LAW SR243, SFN 4403606, 12.7980 Fed/20 State. BR funds eligible but only for rehab, not replacement. 01/STR/BR/State 94308~|~1~|~1~|~01/SAE~|~100% SRTS funds used for pavement marking, sign, and sidewalk upgrades in the City of Cincinnati. 120039~|~1~|~1~|~01/S5K~|~All work included in this split. 123918~|~1~|~1~|~01/NFP~|~Deck sealing 106243~|~1~|~1~|~01/IMS~|~Resurfacing IR 270 from 18.37 to 21.67 106243~|~1~|~3~|~03/IMS~|~Bridge repair to include deck patching, sealing and parapet repair 106243~|~2~|~2~|~02/IMS~|~Crack seal of FRA-270 from 17.10 to 18.35 98071~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.56 to 5.47 107516~|~1~|~1~|~01/S<2~|~Resurfacing COL-154 from SLM 3.84 to 5.63 107516~|~1~|~2~|~02/STR~|~Resurfacing COL-154 from 5.63 to 9.85 25518~|~1~|~1~|~01/STR~|~WOO SR163 0-4.84 25518~|~1~|~2~|~02/STR~|~This plan split is for 2 bridges WOO-163-2.01 (SFN 8704988) and WOO-163-4.84 (8705070). 115448~|~1~|~1~|~01/S>2~|~This plan split includes all work needed for the project description adding sidewalk on Kirby and school zone signage on US-42 and SR-561 at Woodward 94321~|~1~|~3~|~03/STR~|~Bridge on HEN-110 @ 4.81 (SFN 3503275) 94321~|~1~|~4~|~04/NHS~|~Hen 6 16.76 Bridge - SFN 3503240 94321~|~1~|~2~|~02/STR~|~From SLM 2.17 to SLM 5.20 94321~|~1~|~5~|~05/S5K~|~Urban Paving plan split SLM 0.30 to SLM 1.15 94321~|~1~|~1~|~01/S5K~|~From SLM 1.15 to SLM 2.17 (Napoleon) 94321~|~1~|~6~|~06/S5K~|~Pavement Repairs from SLM 0.30 to SLM 1.15 - 100% Local 99730~|~1~|~1~|~01/IMS~|~Work related to spot concrete pavement repair on FRA 270 and MAD 70. 95491~|~1~|~1~|~01/SAF~|~Guardrail upgrade/installation on Nickle Plante Diagonal Road (CR 27) in LaGrange Twp and Carlisle Twp and on Gore Orphanage Road (CR 34) in Henrietta Twp. 110595~|~1~|~1~|~01/S>2~|~Generic plan split for the centerline survey of no passing zones 110990~|~1~|~1~|~01/S>2/BREW~|~Construction of shared use path along STA US 62 in the Village of Brewster. 85840~|~1~|~1~|~01/MPO~|~LAW Ironton Delaware St. Improvements Project Description: It is proposed to add lighting, create crossings, and improve sidewalks because of more demand from a nearby school. KYOVA = 80% match Local (Iroton) = 20% match 01/MPO/OT/Ironton 101076~|~1~|~1~|~01/IMS~|~RPMs 96807~|~1~|~1~|~01/NHS~|~Pavement split for work on SR 317 103255~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural route: CHP SR 54 SLM 1.70 to 8.28.CLA-41 SLM 0.00 to 3.61 - The work to be done on this section is to add edge line and center line rumble stripes and striping to this section ONLY 104299~|~1~|~1~|~01/NHS~|~BRO 68 15.10 (SFN 0801534) Deck Replacement. 89910~|~1~|~1~|~01/SAE~|~Widen westbound SR-125 to provide a right turn lane at Bach Buxton; upgrade the traffic signal at SR-125 & Back Buxton, prepare capacity analysis to determine if an EB PROT-ONLY left can be provided at Bach Buxton, and provide dilemma zone detection at Bach Buxton and the Prive Drive signal to the east. 115651~|~1~|~1~|~01/ERD~|~Plan split using earmark funds along SR 57 corridor in the City of Orrville for eligible traffic control items in construction. 121369~|~1~|~1~|~01/NFP~|~plan split. 111166~|~1~|~1~|~01/NFP~|~Resurfacing at PIC Stage's Pond State Nature Preserve 83942~|~1~|~1~|~01/NFA~|~Resurfacing of CHP SR 245 from SLM 0.000 to 6.17 (segment length 6.17 total lane miles 12.34) 83942~|~1~|~2~|~02/NFA~|~Remove wearing course surface and waterproof bridge deck with overlay asphalt, also replacing polymer joints on SFN 1102419 CHP 245 0138. Patch deck and approach joint on SFN 1102435 CHP 245 0403. Remove 1 1/2" asphalt and repave on SFN 1102486 CHP 245 0569. 90818~|~1~|~1~|~01/ENH~|~80% MORPC Enh & 20% Columbus funding Construct sidewalks & bus shelter pads on Parsons from Obetz rd to Dering Ave 121014~|~1~|~1~|~01/SAF~|~Federally eligible items. 122854~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing around the Gilligan Complex and Brown Arena and pavement repairs under the Viaduct 122854~|~1~|~2~|~02/NFA~|~PAVEMENT REPLACEMENT OF NORTH SIDE OF THE SOUTHERN PARKING LOT, NORTH SIDE OF THE NORTHERN PARKING LOT, SE SECTION OF HISTORY ST AND NE SECTION OF HISTORY ST AT THE OHIO HISTORY CONNECTION. 114364~|~1~|~1~|~01/MPO~|~Resurfacing of Dressler Rd between SR 687 and Belden Village St. 106346~|~1~|~1~|~01/SAF~|~Work funded with funds from the Safe Routes to School (SRTS) program. 104036~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay. ATH 329 3.85 (SFN 0503428). Rural other federal aid funded 80 federal/20 state. 104036~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. ATH 33 6.78 L (SFN 0500577), R (SFN 0500607), ATH 33 11.74 L (SFN 0505781). NHS route funded 80 federal/20 state. 108076~|~1~|~1~|~01/STR~|~General split. Will add more descriptive splits once bridge locations are determined. 98030~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Fai-SR 256-(14.12-24.63) and Per-SR 256-(0.00-0.16) 100785~|~1~|~1~|~01/NFP~|~Various routes. 114678~|~1~|~1~|~01/STR~|~Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run 112250~|~1~|~1~|~01/IMS~|~General plan split added. Will add more specific ones once locations are determined. 105157~|~1~|~1~|~01/NFP~|~Work on various roads within Deer Creek State Park 107282~|~1~|~1~|~01/S<2~|~ROS 207 0.00-2.56 114732~|~1~|~1~|~01/STR~|~FY25 Overlay 109490~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 108160~|~1~|~1~|~01/S>2~|~Replacement of the existing inadequate pedestrian bikeway bridge with an ADA accessible bridge located in a more scenic location. 114127~|~1~|~1~|~01/IMS~|~Culvert rehab project using liner pipe. WAS 77 0.84 (CFN 1804980), WAS 77 4.36 (CFN 1839238) and WAS 77 4.55 (CFN 18050013). 109320~|~1~|~1~|~01/NFP~|~Baltimore OP Salt Storage 95626~|~1~|~1~|~01/NHS~|~Pavement items on US 33 101123~|~1~|~1~|~01/IMS~|~Overlay IR75 with asphalt concrete in Montgomery County: MOT IR 75 SLM 0.00 to 3.92 124964~|~1~|~1~|~01/SAF~|~For TAP eligible expenses 99081~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 2 lane highways - AUG/LOG/CHP/CLA. 103067~|~1~|~1~|~01/NHS~|~Repair of one bridge in COL County (COL-7-0275, SFN 1500074) by replacing backwalls and approach slabs and three bridges in JEF County (JE-7-0066 SFN 4100026, JEF-7-0245 SFN 4100085, JEF-7-0288 SFN 4100115) by replacing approach slabs. 101385~|~1~|~1~|~01/BRO~|~01/BRO/BR/- District Preservation 4PF7/4PS7 (80/20) - No Cap 97351~|~1~|~1~|~01/NFA~|~Task Order 122589~|~1~|~1~|~01/ERD~|~Stabilize a landslide above the existing retaining wall on the west side of Columbia Parkway (US 50) 2,400 feet south of Beechmont Avenue. Stabilize a landslide above the existing retaining wall on the north side of Riverside Drive from approximately 750 feet east of Kemper Lane to the Rookwood rail overpass. 96473~|~1~|~1~|~01/NFP~|~Type B Emergency to repair bottom flange of fascia beam, two stiffners, and one crossframe for the HAM-275-1345 (SFN 3116468) structure. 81705~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during project scoping. 104864~|~1~|~1~|~01/SAF~|~Round AboutLorain County using approved OPWC funds 112549~|~1~|~1~|~01/MPO~|~AMATS funded resurfacing 100360~|~1~|~1~|~01/STR~|~Overlay SR 118 & SR 703 with asphalt concreteMER SR 118 3.91 - 7.88MER SR 703 8.92 - 11.13 100360~|~1~|~2~|~02/S<2~|~Overlay SR 118 & SR 703 with asphalt concreteMER SR 118 7.88 - 8.34MER SR 703 6.48 - 8.92MER SR 703 11.13 - 11.23 122508~|~1~|~1~|~01/S5K~|~Plan split for federally eligible work items being funded with Large City (Wooster) funds. 105494~|~1~|~3~|~03/S<2~|~Urban Area < 200000 Plan Split 87382~|~1~|~1~|~01/NFA~|~Complete bridge replacement with minimal approach work on SFN 1904299 DAR 722 0554 on State Route 722 over a branch of Twin Creek, 0.74 miles West of US 127 in Castine. 87382~|~1~|~2~|~02/STR~|~Repair deck edges, patch abutments using anodes and encasing piers on SFN 1904264 DAR 721 0543. 114274~|~1~|~1~|~01/IMS~|~Mowing contract in District 8 91719~|~1~|~1~|~01/IMS~|~Rehabilitate bridges HAM-71-1989L/R and WAR-71-0009 L/R installing new rigid overlays and replacing the roadway barrier between the northbound bridges, and perfroming other minor bridge rehabilitation items.HAM 71 1989L; SFN: 3107752 and intersects: Fields Ertel RdHAM 71 1989R; SFN: 3107760 and intersects: Fields Ertel RdWAR 71 0009L; SFN: 8301697 and intersects: Mason-Montgomery RdWAR 71 0009R; SFN: 8301727 and intersects: Mason-Montgomery Rd 103116~|~1~|~1~|~01/NFA~|~The county will construct a new 300' turn lane off of N. Main Street to safely allow truck deliveries in and out of Whirlpool which is expanding its Findlay facility. 110046~|~1~|~1~|~01/NHS~|~NHS portion of resurfacing on CLE-125 101043~|~1~|~1~|~01/STR~|~MAH SR 165 from 5.46 to 16.64MAH SR 170 from 0.00 to 0.78MAH SR 534 from 13.78 to 16.31 101043~|~1~|~2~|~02/S>2~|~MAH SR 46 from 10.83 to 12.04MAH SR 625 from 0.22 to 2.59 78883~|~2~|~2~|~02/S<2~|~Erosion/slide repair of State Route 531, at SLM 2.40. 78883~|~1~|~1~|~01/S<2~|~Erosions/slide repair of State Route 531, between SLM 2.90 through SLM 3.58. 92000~|~1~|~3~|~03/S<2~|~HIG SR124 Resurfacing ProjectUrban Area portion: HIG 124 (10.70-10.84/10.84-11.02) & HIG 247 (11.91 - 11.96)80% Federal /20% StateCO CC PV Urban PV is to cover the state portion within the urban area. 92000~|~1~|~1~|~01/STR~|~HIG SR124 Resurfacing projectRural portion: 11.02 - 17.82Pave Thru Brdg:3602052 HIG SR124 17.33 Intersect: Smith Branch80/20 split 92000~|~1~|~2~|~02/STR~|~HIG SR124 Brdgs f/Rehab3601986 HIG SR124 14.59 Intersect: Ervins Branch3601935 HIG SR124 13.58 Intersect: Wolf Run80/20 split 92000~|~1~|~4~|~04/S<2~|~HIG 124 (8.78-9.44/ 10.36-10.70/ 10.84-10.86) HIG 247 (11.74-11.91/ 11.96-12.37) Federal/Local Match 80/20 115660~|~1~|~1~|~01/BRO~|~Replace Bridge 91760~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 555 0.00-3.27. Not on any federal aid system funded 100% state. 96652~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. NOB 761 0.00-1.90 Not on any federal aid system funded 100 % state. 96652~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GUE 313 20.99-21.01 and NOB 313 0.00-6.17. Rural other federal aid funded 80 Federal/20 State. 102562~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. MOE 78 0.00-8.15, 15.05-23.50. Rural other federal aid funded 80 federal/20 state. 123453~|~1~|~1~|~01/STR~|~Resurfacing SR 150 82978~|~1~|~1~|~01/IMS~|~District Wide Crack Sealing project on the Priority System for FY2017. Routes to be determined. (approx 100 lane miles) 102148~|~1~|~1~|~01/STR~|~Bridge replacement LAW SR 217 6.85 (SFN 4403002) 109787~|~1~|~1~|~01/STR~|~AC overlay without repairs 98281~|~1~|~1~|~01/NHS~|~SFN 7710828 SUM-SR 8-6.44 Bridge Hit repair to include beam heat straightening and cross frame replacement 118900~|~1~|~1~|~01/STR~|~Resurfacing SR 514 107813~|~1~|~1~|~01/STR~|~All work is in this split. Funding is 100% state funds from the district preservation program using SAC 4PS7. 108151~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-33D-1.28-2.12 99578~|~1~|~1~|~01/BRO~|~Bridge repair project that includes a deck replacement. ATH 56 10.57, SFN 0502642. BR eligible funded 80 federal/20 state. 89348~|~1~|~1~|~01/ENH~|~This split is for work eligible for funding from the state Transportation Enhancement Program. The January 2011 approval letter which stated "ODOTT will provide 80% of the eligible costs, up to a revised maximum of $520,000 in Federal funds through the Transportation Enhancement Program for the Main Street (S.R. 634) Lighting Enhancement Project" also stated ODOT had "revised the funding Award for the subject project at the villages's request to remove proposed sidewalk rehabilitation items from the scope of services." 95246~|~1~|~1~|~01/MPO~|~Widen SR 301 (Center Street)from 2 to 3 lanes, Forest Street to north LaGrange Village Limits. 95657~|~1~|~1~|~01/NFA~|~Fuel Tank Removal at Berkshire Outpost 95657~|~1~|~2~|~02/NFA~|~Fuel tank removal at Jeffersonville Outpost 102058~|~1~|~1~|~01/STR~|~Slide Repair.$1,000,000 project cap for GSM funds for priority 1.Remaining funds will be District Allocation for priority 2. 98531~|~1~|~2~|~02/NHS~|~100% state funding for culvert work. 98531~|~1~|~1~|~01/NHS~|~Split for 100% local items 95949~|~1~|~1~|~01/NFA~|~STW American Idle TSE 94361~|~1~|~1~|~01/NHS~|~On US35, 6.32 miles east of the Ross County line, it is proposed to regrade an existing rock slope by blasting.80/20 split01/NHS/OT/State 97771~|~1~|~1~|~01/BRF~|~Bridge replacement project. MEG 12029 0.01 (SFN 5342120). OBPP funding. 97771~|~1~|~2~|~02/BRF~|~Bridge replacement project. MEG 2262 0.25 (SFN 5332168). OBPP funding. 87350~|~1~|~1~|~01/NHS~|~Priority System minor rehab. of JEF-22 87350~|~1~|~2~|~02/NHS~|~Bridge deck and approach slab patching. 102738~|~1~|~1~|~01/S>2~|~Bridge Replacement: MED-3-12.00 (SFN 5200199) 87113~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. MEG 124 36.88-42.02. Rural other federal aid funded 80 federal/20 state. 87113~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. Funded 100% State. 116211~|~1~|~1~|~01/BRO~|~Superstructure replacement utilizing 4R87 Federal Funds at 95% ($1,481,225 maximum). 87329~|~1~|~1~|~01/STR~|~7302525 SCI SR73 10.43 Intersect: StreamIn Henley on SR73, 0.07 mile south east of the Norforlk & Southern Railroad tracks, it is proposed to replace the deficient structure. 112786~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span. 112786~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 10' to 20' span. 112786~|~1~|~1~|~01/IMS~|~Resurfacing. 114384~|~1~|~1~|~01/STR~|~Established Plan SPlit 01/STR/PV/ 112836~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span. 112836~|~1~|~1~|~01/NHS~|~Resurfacing. 124443~|~1~|~1~|~01/NHS~|~added plan split. 97580~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing of US 40 (SLM 9.75 to 10.78) and SR 48 (SLM 21.45 to 22.13 and SLM 23.16 to 24.11) within the City of Englewood. 97580~|~1~|~2~|~02/NHS~|~Pavement planing and resurfacing of SR 48 (SLM 24.37 to 25.12) within the City of Union 97580~|~1~|~3~|~03/NHS~|~Pavement planing and resurfacing of SR 48 (SLM 24.11 to 24.37) within the City of Clayton. 114981~|~1~|~1~|~01/STR~|~Crack Sealing 116718~|~1~|~1~|~01/IMS~|~Interstate Plan Split 115906~|~1~|~1~|~01/SAF/BARB~|~Extend Holmes Ave from 3rd St to Wunderlich Ave in the City of Barberton 95269~|~1~|~1~|~01/SAF/SCI~|~It is proposed to install/repair guardrail on various county routes in Scioto County.100% HSIP 105230~|~1~|~1~|~01/NHS~|~AC overlay without repairs on NHS routes: LOG US 33 SLM 0.00 to 2.01. 112998~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 104267~|~1~|~1~|~01/SAE~|~Upgrading guardrail and end terminals and adding new guardrail on various county routes throughout Trumbull County. 21781~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for this project using federal BR funds. SFN 1807730 96328~|~1~|~1~|~01/STR~|~ADA SR 136 0.00-4.34 96328~|~1~|~2~|~02/NHS~|~BRO US 52 21.05-23.73 96366~|~1~|~1~|~01/STR~|~Rebuild left deck edge (approx. 3' wide). Rebuild left forward wingwall encase all pier columns. Seal entire structure with concrete sealer AUG-66-1819. Rebuild deck edges (both sides) AUG-197-1208. Structure patch both (l&r) T-joints over pier. Suggest using a self consolidating concrete (SCC). CHP-29-1241. Reface abutments with s=anodes haunching out at the top to cover deck spalls along abutments, encase pier columns, patch/rebuild wingwalls with anodes, correct erosion at wings and seal longitundinal joint on wearing surface - SFN 0601268 AUG 66-1981. 96366~|~1~|~2~|~02/NHS~|~Rebuild deck edges, rebuild abutment corners, encase pier columns LOG-33-0888. 102459~|~1~|~1~|~01/IMS~|~Double Micro resurfacing of BEL-70 80748~|~1~|~5~|~05/S>2/Dub~|~Enhancements and non eligible items to be paid 100% by Dublin 80748~|~1~|~6~|~06/S>2/AEP~|~Utility items to be paid 100% by AEP (thru Dublin) 80748~|~1~|~7~|~07/S>2/Spec~|~Utility items to be paid 100% by Spectrum (thru Dublin) 80748~|~1~|~8~|~08/S>2/Dlnk~|~Utility items to be paid 100% by Dublink (thru Dublin) 80748~|~1~|~1~|~01/NHS~|~Pavement work on US 33 (including ramps) 80748~|~1~|~2~|~02/S>2~|~Pavement work on SR 161, Post Rd, Hyland Croy Rd and Post Preserve Blvd. 80748~|~1~|~3~|~03/NHS~|~Bridge replacement (UNI-33-2489 L/R) 80748~|~1~|~4~|~04/S>2~|~Bridge (culvert) rehabilitation (UNI-33-24.50 and FRA-33-0014) 80748~|~1~|~9~|~09/NFA~|~Retroactive fuel price adjustment 93134~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3002705 GUE IR77 7.08 Intersect: I-77 Under Cr 35; BR Eligible for Rehabilitation: Length=280 SD/FO(1) SR=77.5 DSR=4 93134~|~1~|~2~|~02/IMS~|~?02/IMS/CV? ? District Preservation Program 4PF 7 (90% Federal) / 4PS7 (10% State) ? No Cap ? Inserting culvert liner on GUE-IR 77-7.08R 84652~|~1~|~3~|~03/BRO~|~SFN 5007054 MAH-IR 680-5.85 Ridge Avenue over I-680 84652~|~1~|~2~|~02/IMS~|~See linked structures >20' span. 84652~|~1~|~1~|~01/S>2~|~IR680 4.12-6.97 124448~|~1~|~1~|~01/SAF~|~Install High Vis Markings and RRFB's 87268~|~1~|~1~|~01/IMS~|~Funding split for all costs associated with Structure HAM-71-0134 for ventilation/mechanical/structural upgrades including necessary park impack improvements. 87268~|~1~|~2~|~02/IMS~|~Plan split to repair deck on HAM-71-0159. 110176~|~1~|~1~|~01/IMS~|~Approximately 200 feet of the up-slope, along the right shoulder of the WB I-275 entrance ramp from Loveland-Madeira Rd., experienced over-saturated overburden soil and migrated down the slope, filling the ditch and pushing trees into the shoulder. 115542~|~1~|~1~|~01/NFA~|~Created for J&C involvement 99537~|~1~|~1~|~01/NHS~|~Resurfacing work funded at 80/20 fed/state 94437~|~1~|~1~|~01/STR~|~Bridge - Major Rehabilitation 111601~|~1~|~1~|~01/NHS~|~Maintain structure JEF-7-12.93 by cleaning steel pier caps and installing animal guards. 124158~|~1~|~1~|~01/STR~|~Proposed County Garage 92334~|~1~|~1~|~01/ENH/ZANE~|~"01'ENH/OT/ZANE" City of Zanesville Enhancement project - Installation of sidewalk and decorative lighiting from Shinnick Street from 6th to 4th / 4th Street from Shinnick to Market Street - Enhancement Project Cap of $750,000 113982~|~1~|~2~|~02/NHS~|~Plan Split to resurface the ramps at the CLE-32 + CLE-133 interchange 113982~|~1~|~1~|~01/STR~|~Edge replacement on: CLE 133 SLM 22.25 to 31.16 113982~|~1~|~3~|~03/S>2~|~Plan split for Urban Portion of CLE-133: SLM 22.0-22.25 76802~|~1~|~1~|~01/IMS~|~100% UNFU plan split 118117~|~1~|~1~|~01/NHS~|~added plan split. 123893~|~1~|~1~|~01/S>2~|~Construct a separated two-way cycle track by reducing roadway to three lanes 103791~|~1~|~1~|~01/SAF~|~Reconstruct traffic signals - City of Springfield. 102732~|~1~|~3~|~03/NHS~|~Minor bridge work. 102732~|~1~|~1~|~01/NHS/RAVE~|~Resurfacing, urban paving in the City of Ravenna. 102732~|~1~|~2~|~02/NHS/RAVE~|~100% Ravenna Items, full and partial depth repairs, ADA curb ramps and reconstruction of catch basins. 111203~|~1~|~1~|~01/MPO~|~MPO funded plan split 111203~|~1~|~2~|~02/NFA~|~Non-federal & non-OPWC work being completed on project 120929~|~1~|~1~|~01/NFP~|~Mowing. 118758~|~1~|~1~|~01/STR~|~added plan split. 99637~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state 118989~|~1~|~1~|~01/SAF/STCE~|~Construct roundabout. 90208~|~1~|~1~|~01/ENH~|~Sidewalk installation on Fairground Boulevard and Hood Drive. 124855~|~1~|~1~|~01/S>2~|~Traffic signal upgrades along SR 256 corridor 94931~|~1~|~1~|~01/SAF~|~Safety/local & MORPC/local funding for Schrock/Cleveland intersection turn lanes 94931~|~1~|~2~|~02/SAF~|~Safety/local & MORPC funding for Schrock/Cleveland intersection turn lane 101755~|~1~|~1~|~01/IMS~|~Resurfacing along IR 70 in LIC and MUS counties 99927~|~1~|~1~|~01/IMS~|~1. Remove LMC overlay and replace with SDC concrete using hyro-demolition. 2. Replace expansion joint seals. 3. Replace splice bolt (span 2, beam 4). 4. Investigate epoxy injection for abutment vertical cracks. 5. Patch backwalls with item 519. 6. Seal concrete surfaces with epoxy-urethane. 110409~|~1~|~1~|~01/SAE~|~Safety Program - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - Intersection upgrade of SR 158 and Pleasantville Road 110409~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 116819~|~1~|~1~|~01/STR~|~Bridge replacement. 103176~|~1~|~1~|~01/S>2~|~Extend the Wolf Creek Bikepath in the City of Dayton 121667~|~1~|~1~|~01/IMS~|~Repair rear abutment. 110310~|~1~|~1~|~01/STR~|~ResurfacingHIG 72 0.00-6.71 110310~|~1~|~2~|~02/STR~|~Bridge PM. 106373~|~1~|~1~|~01/IMS~|~Field pave IR culvert. 106373~|~1~|~2~|~02/STR~|~Remove and replace rural route culvert. 97022~|~1~|~1~|~01/ENH~|~SRTS Butler--installation of sidewalk on Morgan and Wilson. 113816~|~1~|~1~|~01/STR~|~Replace structurally deficient bridge with minimal approach work. 117880~|~1~|~1~|~01/NFP~|~Split for tree removal work 117093~|~1~|~1~|~01/SAF~|~Pavement marking and signage for bike routes. 117093~|~1~|~2~|~02/NFP~|~Pavement marking and signage for Bike routes on municipal routes in the City of Portsmouth. 99915~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for guardrail upgrades 117681~|~1~|~1~|~01/STR~|~Replace superstructure. 90127~|~1~|~1~|~01/BRO~|~8702136 WOO SR51 0.4 Intersect: Crane Creek 8702012 WOO SR51 3.02 Intersect: Dry Creek 90127~|~1~|~2~|~02/S>2~|~8702101 WOO SR51 1.78 Intersect: Ayers Creek 8702071 WOO SR51 2.16 Intersect: Little Cedar Creek 95100~|~1~|~1~|~01/ENH/Warr~|~Construction of new gateway signs throughout the City of Warren, Trumbull County, Ohio. 109376~|~1~|~1~|~01/NFP~|~Culvert and resurfacing project in Tranquility WLA. 98836~|~1~|~1~|~01/IMS~|~Split for sign structure repair 100893~|~1~|~1~|~01/STR~|~SCI 140 7.65 (SFN 7304293) 87664~|~1~|~1~|~01/SAF~|~Constructing roundabout at Summit and Powder Mill Roads 111446~|~1~|~1~|~01/NFP~|~Miscellaneous charges not attributable to a specific PID 102950~|~1~|~1~|~01/MPO~|~Resurfacing project on WAS CR 60 5.00-6.33. Funded 80 federal/20 local. 100059~|~1~|~1~|~01/STR~|~Slide Repair 90192~|~1~|~1~|~01/IMS~|~Lighting maintenance 87208~|~1~|~1~|~01/NFP~|~This project is a SPEDuP project and must use 100% state funds. All work in this project is in this Plan Split. This includes work on SR 15 which is a Rural Major Collector and the work on SR 634 south of SR 613 which is a Rural Minor Collector. Federal funds cannot be used to resurface Rural Minor Collectors. State funds from the District Preservation Program. No local funds. 91773~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. NOB 147 3.50-21.04. Rural other federal aid funded 80 federal/20 state. 91773~|~1~|~2~|~02/STR~|~Landslide repair on NOB 147 5.12 and 5.32. 80192~|~1~|~1~|~01/IMS~|~New interchange at IR-680 at SR-164 in Mahoning County, Ohio. 80192~|~2~|~2~|~02/SAF~|~Along State Route 164 add a SB auxillary lane South of the interchange to just South of the State Route 626 intersection; addition of a southbound LTL on State Route 164 at the State Route 626 south junction; conversion of the State Route 626 North junction to a multilane roundabout; Beaver Township, Mahoning County, Ohio. 80192~|~2~|~3~|~03/IMS~|~Widening and replacement of SR-164 structure (SFN#5029783) over the Ohio Turnpike, Beaver Township, Mahoning County, Ohio. 80192~|~1~|~6~|~06/IMS~|~Plan Split for Ongoing Engineering services. 80192~|~2~|~4~|~04/IMS~|~State Route 164 pavement from SLM 5.19 to SLM 5.27 that ties into 250 feet of Ramp DH. 80192~|~3~|~5~|~05/MPO~|~Construction of park n ride along State Route 164. 85394~|~1~|~2~|~02/NHS~|~Plan split for work in the Village of Hunting Valley 85394~|~1~|~1~|~01/NHS~|~Split for work in Pepper Pike 85394~|~1~|~3~|~03/NFP~|~features/work requested by the LPA at 100% percent local participation 119056~|~1~|~1~|~01/S>2~|~Plan split for project to Paint bridge CLE-275-1008 which carries Old SR 74 over I-275. Project will include other miscellaneous repairs. 124445~|~1~|~1~|~01/NHS~|~added plan split. 105588~|~1~|~1~|~01/IMS~|~IR 70 existing pavement reconstruction from railroad bridge to Front St. (50%), resurfacing and restriping IR 70 from Front St to Grant Ave, Ramp D7, and local streets (Mound, Short, Civic Center, Second) 105588~|~1~|~2~|~02/NHS~|~IR 70 widened pavement from railroad to Front St. (50%) and retaining walls 105588~|~1~|~3~|~03/IMS~|~Bridge replacement - existing width - FRA-71-1503L (I71 SB over railroads, Scioto River, and SR 315 (50%) 105588~|~1~|~4~|~04/NHS~|~Bridge replacement - widening - FRA-71-1503L (50%) 105588~|~1~|~5~|~05/NHS~|~New bridge - FRA-70-13.73B (Ramp D7 over Short St) 105588~|~1~|~6~|~06/NHS~|~Eligible utility items (waterworks, sanitary, electric, etc) 105588~|~1~|~7~|~07/NHS/MPO~|~MORPC/Columbus funded enhancements 105588~|~1~|~8~|~08/NHS/Cols~|~100% City of Columbus items 105588~|~1~|~9~|~09/NHS/Inc~|~Incremental items - Columbus to pay costs above standard items 102711~|~1~|~1~|~01/NHS~|~Bridge Replacement: MED-18-3.29 (SFN 5200571) 103403~|~1~|~1~|~01/S<2~|~Landslide repair. NOB 78 8.38. Work length approximately 250 ft. DSR NOB-008. 98700~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Maintenance 4CP7 (100% State) - No CAP - Priority System mowing in D-05 for CY 2016 and CY 2017: Location 1) Fai IR 70; Location 2) Lic IR 70; Location 3) Mus IR 70; Location 4) Gue IR 70; Location 5) Gue IR 77; 112403~|~1~|~1~|~01/IMS~|~Rehabilitate FRA 70 Pump Stations ST-1 and ST-1A 103995~|~1~|~1~|~01/ENH~|~Crosswalk enhancements. 90213~|~1~|~1~|~01/MPO~|~high st/west main st SR5 18.27-20.11 102377~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2022 herbicidal spraying. Funded 100% state. 116460~|~1~|~1~|~01/SAF/GREE~|~Adding cross walk to S Main St. 107891~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 81 2.07-2.09. DSR MOE-014. Funded 100% federal. 99997~|~1~|~1~|~01/IMS~|~Split for work on the interstate system. 99997~|~1~|~2~|~02/NHS~|~Split for work on the NHS 109586~|~1~|~1~|~01/NHS~|~Bridge Split 97957~|~1~|~1~|~01/IMS~|~SFN 8706182 Redeck 82314~|~1~|~1~|~01/CMQ~|~Construct a multi-use trail connecting the existing multi-use trail segments in Springfield from Fair Street to Johnny Lytle Avenue and from John Street to Leffel Lane in Springfield. 103316~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. GAL 35 12.76 L&R (SFN 2701014 L) and (SFN 2701030 R) and GAL 35 13.42 L&R (SFN 2701065 L) and (SFN 2701073 R). 121675~|~1~|~1~|~01/NHS~|~Resurfacing NHS 106253~|~1~|~1~|~01/NHS~|~Safety 119769~|~1~|~1~|~01/STR~|~added plan split. 121177~|~1~|~1~|~01/NHS~|~NHS Plan Split 121177~|~1~|~2~|~02/NHS/Cols~|~City of Columbus Urban Paving Plan Split 121177~|~1~|~3~|~03/NHS/Cols~|~Items of work to be paid 100% by the City of Columbus. 109698~|~1~|~1~|~01/STR~|~Herbicidal Spraying 93259~|~1~|~1~|~01/BRO~|~District Preservation 4PS7(100% State) - No CAP - Rehabilitation on 4200934 KNO SR13 22.39 Intersect: Markley Run; BR Eligible for Rehabilitation: Length=54 SD/FO(1) SR=66.6 DSR=7 85181~|~1~|~1~|~01/MPO~|~Construct a two way left turn lane, install storm sewer, sidewalks, and other roadway improvements on SR 235 from Galewood Drive (5.08 SLM) to 0.85 Miles north of Galewood Drive (6.16 SLM) in New Carlisle. 85181~|~1~|~3~|~03/STR~|~Resurfacing on SR 235 from SLM 5.89 to 6.16. 85181~|~1~|~2~|~02/S<2~|~Urban resurfacing on SR 235 in Clark County from SLM 5.08 to 5.77 in New Carlisle. 119116~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay on GAL 325 0.00-7.26 and GAL 588 0.00-0.76. 96670~|~2~|~7~|~07/S>2~|~See linked structure > 20' span. 96670~|~2~|~3~|~03/S>2/BARB~|~Resurfacing of SUM SR619 from SLM 0.00 to SLM 0.66 in the City of Barberton, urban paving. 96670~|~1~|~11~|~11/IMS~|~Reconstruction portion of the linked structures. 96670~|~1~|~12~|~12/BRO~|~Construction of new structure along IR-76 access road, SFN# 7705435. 96670~|~1~|~13~|~13/IMS~|~Bridge Rehab to linked structure. 96670~|~1~|~1~|~01/IMS~|~Widening portion of SUM IR76. Includes waterline replacement. 96670~|~1~|~10~|~10/IMS~|~Reconstruction of existing IR 76. Includes waterline replacement. 96670~|~1~|~14~|~14/NFP~|~Widening work along State/Romig associated with change order work. 117918~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-E 100765~|~1~|~1~|~01/STR~|~Culvert Replacement at PIC-56-28.30 101056~|~1~|~6~|~06/NHS~|~Minor bridge rehab > 10' to 20' span. 101056~|~1~|~1~|~01/NHS~|~Major 2 resurfacing with extensive base repairs. 101056~|~1~|~2~|~02/S>2~|~Major 2 resurfacing with extensive base repairs. 101056~|~1~|~3~|~03/STR~|~Major 2 resurfacing with extensive base repairs. 101056~|~1~|~4~|~04/STR~|~Resurfacing. 101056~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance. 101056~|~1~|~7~|~07/STR~|~Bridge preventive maintenance. 101056~|~1~|~8~|~08/STR~|~Minor bridge rehab > 10' to 20' span. 116934~|~1~|~1~|~01/NHS~|~Bridge Painting 116934~|~1~|~2~|~02/STR~|~Bridge Painting 116934~|~1~|~3~|~03/IMS~|~Bridge Painting - Interstate 110401~|~1~|~1~|~01/STR~|~Resurfacing SR 149 116418~|~1~|~1~|~01/NHS~|~Reconstruction of US-20 116418~|~2~|~2~|~02/NHS~|~Part 2 for OPWC-funded segment. 97228~|~1~|~2~|~02/STR~|~Liner on BRO 68 40.91 (SFN 0801887) 97228~|~1~|~1~|~01/NHS~|~ADA SR 32 21.54 97228~|~1~|~3~|~03/STR~|~PIK 772 15.35 116281~|~1~|~1~|~01/IMS~|~Plan split to program project. Update when scope of work is complete. 102270~|~1~|~1~|~01/NFA~|~Ross Industrial Parkway Phase 1. 107533~|~1~|~1~|~01/IMS~|~Reconstruction of BEL-70 pavement 106242~|~1~|~1~|~01/IMS~|~plans split for the resurfacing on I-71 92240~|~1~|~1~|~01/BRF~|~Ravenna Rd CR12 SFN 7756046 over tinkers creek 111471~|~1~|~2~|~02/S<2~|~Resurfacing in Hardin County inside of the Kenton Urban Area. Work on CR 175 from the beginning of the route at CR 160 at SLM 0.00 until the north boundary of the Kenton Urban Area at TR 110 at SLM 4.54. Federal funds from the CEAO budget with the match and overage provided by Hardin County. 111471~|~1~|~1~|~01/STR~|~Resurfacing in Hardin County outside of the Kenton Urban Area. Work on CR 175 from the north boundary of the Kenton Urban Area at TR 110 at SLM 4.54 north until the end of the work on CR 175. All work on CR 265 and CR 209. Federal funds from the CEAO budget with the match and overage provided by Hardin County. 111471~|~1~|~3~|~03/NFA~|~Resurfacing in Hardin County on non federal aid routes. All work on CR 190. Federal funds from the CEAO budget with the match and overage provided by Hardin County. 101020~|~1~|~2~|~02/NHS~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Spot Paving Repairs on 1) GUE - 22- 10.88 to 30.68 101020~|~1~|~3~|~03/NFA~|~District Preservation Pavement Funds - 4PS7 (100% State) - No CAP - Spot Paving Repairs on 1) PER-757-0.30 to 5.60 101020~|~1~|~1~|~01/STR~|~District Preservation Pavement Funds - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Spot Paving Repairs on OFAH-Rural on 1) FAI-22-9.92 to 10.03, 2) FAI-22- 2.23 to 2.34, 3) FAI-664-7.55 to 12.44, 4) FAI-256-7.20 to 14.04, 5) PER-13-21.17-27.21, 6) PER-13-27.78-27.99 119813~|~1~|~1~|~01/SAF~|~Intersection/curve improvement. HOC 664 12.74. 105901~|~1~|~1~|~01/S<2~|~Urban Paving in the City of Bellefontaine 116250~|~1~|~1~|~01/STR~|~AC Overlay with Repairs 86638~|~1~|~1~|~01/STR~|~Resurfacing 3.73 to 6.22 86638~|~1~|~2~|~02/S<2~|~Resurfacing 6.22 to 6.96 109430~|~1~|~1~|~01/MPO~|~Construction of a 10 foot wide asphalt shared use path to connect the Gilmore MetroPark Bilstein Trailhead to the existing terminus of the Miami and Erie Canal Trail at SR 4 Bypass. 101515~|~1~|~1~|~01/NFP~|~Paint Inspection Task Order PID. 100309~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to TRU SR 5 from 14.39 to 18.25. 105427~|~1~|~1~|~01/S>2~|~Plan Split for all 315 Bridges 98194~|~1~|~1~|~01/NHS~|~Culvert replacement. HOC 78/216 Murray City. NHS route funded 80 federal/20 state. 101187~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: SHE SR 65 SLM 0.00 to 5.47 93952~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2017. Various routes and sections in D10. Funded 100% state. 119665~|~1~|~1~|~01/NFP~|~Culvert replacements 110218~|~1~|~1~|~01/NHS~|~Landslide repair project. GAL 35 14.80. NHS route funded 100% State ER. 93117~|~1~|~1~|~01/STR~|~District Allocation 93117~|~1~|~2~|~02/S<2~|~District Allocation 121938~|~1~|~1~|~01/ERD~|~Plan Split for NAE - Reconnecting Communities & Neighborhoods Grant 85525~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 108360~|~1~|~1~|~01/STR~|~ADA 770 1.90 slide repair. DSR# ADA-004 97767~|~1~|~1~|~01/NFP~|~Construct new Chesterville Outpost in Morrow County 112464~|~1~|~1~|~01/NFA~|~Plan split for local. 112464~|~1~|~2~|~02/NFA~|~Plan split for transfer to MARAD. 112464~|~1~|~3~|~03/NFA~|~Plan split for MAP. 112464~|~1~|~4~|~04/NFA~|~Plan split for Maritime transfer of CRRSAA funds to STBG. 112464~|~1~|~5~|~05/NFA~|~Create Plan Split for transfer to MARAD 112464~|~1~|~6~|~06/NFA~|~Create plan split for transfer to MARAD 123752~|~1~|~1~|~01/IMS~|~Interstate plan split 113554~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 22221~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 121656~|~1~|~1~|~01/S50~|~Replace bridge 114072~|~1~|~1~|~01/S>2~|~Local Muni local bridge funding plan split 120807~|~1~|~1~|~01/STR~|~Crack Seal. 99420~|~1~|~1~|~01/SAF~|~Safety funded intersection project 122489~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 115692~|~1~|~1~|~01/NFA~|~Miscellaneous charges for the test lab not attributed to a specific PID 117139~|~1~|~1~|~01/IMS~|~Plan Split for all interstate roadway work 90976~|~1~|~1~|~01/SAE~|~A safe routes to school funded project to install sidewalks in Pettisville FUL CR0000D 15-15.01 121465~|~1~|~1~|~01/STR~|~added plan split. 108703~|~1~|~1~|~01/S<2~|~Pavement planing, resurfacing, etc.; 95% Small City funds (4B97) and 5% City funds (LNTP). 110793~|~1~|~1~|~01/NFP~|~Landslide repair 107951~|~1~|~1~|~01/NHS~|~Plan split for all work on HEN/LUC-24 124874~|~1~|~1~|~01/SAF~|~CEAO HSIP 114855~|~1~|~1~|~01/S>2~|~Resurface rutted/shoved pavement in Miamtown. 86480~|~1~|~1~|~01/S>2~|~80/20 fed/local fund split for all eligible work 86480~|~1~|~2~|~02/SAF~|~90% Fed / 10% State participation in closing the left-hand entrance ramp from West 28th Street to SR-2 EB and redirect traffic to West 45th Street in the City of Cleveland. 103958~|~1~|~1~|~01/S>2~|~Widening on CLE CR 55 122374~|~1~|~1~|~01/S>2~|~Urban Paving 94604~|~1~|~1~|~01/NFP~|~Long line pavement markings in Ashtabula, Mahoning, and Trumbull Counties, Ohio. 116428~|~1~|~1~|~01/IMS~|~This plan split is for the work on TUS 77. 116428~|~1~|~2~|~02/NHS~|~This plan split is for the work on JEF 22. 100800~|~1~|~1~|~01/NHS~|~Rehab bridges - replace decks 102998~|~1~|~1~|~01/NHS~|~AC overlay without repairs on NHS route: MOT SR 741 SLM 3.17 to 3.61. 103033~|~1~|~2~|~02/NFP~|~Split for work on SR-528 103033~|~1~|~1~|~01/NFP~|~Split for repairs to the Detroit Rd (US-6A) bridge 93411~|~1~|~1~|~01/NFP~|~"01/NVP/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Spray Thermoplastic Striping within District 5 on IR; US; and SR 109092~|~1~|~1~|~01/NFP~|~J&C funded plans split 91658~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. WAS 339 13.64-20.44 and 20.62-24.77. Rural other federal aid funded 80 federal/20 state. 108905~|~1~|~1~|~01/NFA~|~Duke Boulevard Widening. 120199~|~1~|~1~|~01/S5K~|~Reconstruct roadway 120199~|~1~|~2~|~02/ENH~|~Replace sidewalk, add curb bump outs, replace street lighting 120199~|~1~|~3~|~03/S5K~|~Urban paving 104656~|~1~|~1~|~01/MPO~|~See linked structure. 101270~|~1~|~2~|~02/NHS~|~Minor bridge work >20' span. 101270~|~1~|~1~|~01/NHS/KENT~|~Resurfacing, urban paving in the City of Kent. 101270~|~1~|~3~|~03/NHS/KENT~|~100% City of Kent items such as full and partial depth repairs and curb ramps. 98483~|~1~|~1~|~01/STR~|~District Preservation Program funds. 119959~|~1~|~1~|~01/CMQ~|~widen Indian Ripple Road from Woodview Estate East to the Beavercreek East Corp. Line, includes curb, gutter, storm sewer and sidewalk 119959~|~1~|~2~|~02/S>2~|~includes all work associated with widening Indian Ripple from Barronwood Blvd. to Woodview East 119959~|~1~|~3~|~03/S>2~|~includes all work associated with construction of shared use path from original PID 117125 120978~|~1~|~1~|~01/IMS~|~Plan split TBD 105524~|~1~|~1~|~01/S<2/LIMA~|~Work on SR 65 from Fourth Street SLM 5.10 to Elm Street SLM 6.58. Work is located in the City of Lima. The 80% federal funds will be from the District Preservation Program budget SAC 4PF7. The 20% match will be provided by the City of Lima. 105524~|~1~|~3~|~03/STR~|~Work in Allen County on SR 309 from the Lima Urbanized Area boundary at Thayer Road at SLM 18.19 to the Hardin County line at 25.19. Work is outside of the Lima Urbanized Area. All funds will be from the District Preservation Program budget. Three are no local funds in this split. 105524~|~1~|~4~|~04/NFP/LIMA~|~Work in the City of Lima which is funded 100% by the City of Lima. 105524~|~1~|~2~|~02/S<2~|~Work in Allen County on SR 117 from just east of Greely Chapel Road SLM 19.14 to Bowman Road SLM 19.97 and on SR 309 from Mumaugh Road SLM 17.19 to the Lima Urbanized Area boundary at Thayer Road at SLM 18.19. The work is inside the Lima Urbanized Area but outside of the City of Lima. All funds will be from the District Preservation Program budget. There are no local funds in this split. 105524~|~1~|~5~|~05/NHS~|~Work on SR 309 in Allen County that is on an NHS Intermodal Connector. The work is from the beginning of the work on SR 309 at 15.98 to Mumaugh Road at 17.19. All funds will be from the District Preservation Program budget. There are no local funds in this split. 92787~|~1~|~1~|~01/STR/PIK~|~Prelace guardrail at the various locations listed below.PIK-CR-2 CPIKCR00002**C 0.300 to 0.640 PIK-CR-2 CPIKCR00002**C 0.870 to 1.330PIK-CR-16 CPIKCR00016**C 1.910 to 1.990PIK-CR-16 CPIKCR00016**C 2.230 to 2.320 PIK-CR-16 CPIKCR00016**C 2.500 to 2.630 PIK-CR-16 CPIKCR00016**C 2.730 to 3.150 PIK-CR-16 CPIKCR00016**C 3.450 to 3.530 PIK-CR-16 CPIKCR00016**C 3.930 to 4.050 PIK-CR-33 CPIKCR00033**C 0.650 to 0.700PIK-CR-33 CPIKCR00033**C 0.740 to 0.850 PIK-CR-33 CPIKCR00033**C 1.670 to 1.750 PIK-CR-33 CPIKCR00033**C 1.890 to 2.190 PIK-CR-34 CPIKCR00034**C 0.680 to 0.870 PIK-CR-34 CPIKCR00034**C 1.330 to 1.450PIK-CR-34 CPIKCR00034**C 1.710 to 1.890 PIK-CR-34 CPIKCR00034**C 2.700 to 2.820 PIK-CR-34 CPIKCR00034**C 3.110 to 3.360 PIK-CR-55 CPIKCR00055**C 0.360 to 0.470 PIK-CR-55 CPIKCR00055**C 0.500 to 0.680 100% Fed using CEAO funds. 109647~|~1~|~1~|~01/S<2~|~Resurfacing COL-62 114216~|~1~|~1~|~01/SAF~|~ROS 159 Signal Improvements. 114216~|~2~|~2~|~02/NFA~|~ ROS 159 Signal Improvements. 114388~|~1~|~1~|~01/BRO~|~Replace superstructure of bridge carrying US 40 over Wheeling Creek, CR 10 and an abandoned railroad. 120604~|~1~|~1~|~01/MPO~|~Federal items. 101961~|~1~|~1~|~01/SAF/LCEO~|~CEAO Highway Safety Funding Program - 4HB7 (100% Federal) - See CAP Comments - Licking County project to install new or upgrade existing guardrail on various County Routes in Licking County. 109806~|~1~|~1~|~01/STR~|~AC Overlay without repairs 87731~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 104869~|~1~|~1~|~01/IMS~|~New Rest Area on Current Site 104869~|~1~|~2~|~02/NFA~|~demolition of the Preble I-70 Westbound Rest Area. 104869~|~1~|~3~|~03/IMS~|~Revised Dog Walk 114697~|~1~|~1~|~01/SAF~|~Implement pedestrian safety improvements along Harrison Ave within the City of Cheviot. Improvements include a road diet, curb bump outs, RRFBs, a raised intersection, raised crosswalks, and pavement marking/signing upgrades. 114775~|~1~|~1~|~01/STR~|~plan split for Rural culverts 104770~|~1~|~1~|~01/NFP~|~2 Year Loop Detector replacement district wide. 122970~|~1~|~1~|~01/MPO~|~OKI STBG Funds, 80/20 ODOT/Local 100950~|~1~|~1~|~01/NHS~|~Fine graded polymer AC overlay to ATB SR 11 from 13.94 to 22.16. 99415~|~1~|~1~|~01/SAF~|~Safety funding to construct roundabout at Smothers & Schott/Red Bank 123732~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on the interstate, no added capacity 108404~|~1~|~1~|~01/SAF~|~100% State Funds for repairing void under the pavement on I-90 EB passing lane/shoulder. 114053~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 96261~|~1~|~3~|~03/S<2~|~Cost to replace the twin 60? culverts on US 127. The 80% federal funds and the 20% state match will be from the District Preservation Program. 96261~|~1~|~1~|~01/S<2/VANW~|~This Plan Split is for road reconstruction work eligible for federal funds from the small cities program. The non-federal funds are being provided by the City of Van Wert. 96261~|~1~|~2~|~02/NFP/VANW~|~This Plan Split is for the 100% locally funded water and sanitary work that is not eligible for federal funds. 91352~|~1~|~1~|~01/BRO~|~7305796 SCI SR348 17.51 Intersect: Scioto River 80 Fed/20 State. 01/BRO/BR/State 105619~|~1~|~1~|~01/NHS~|~General System NHS Split: DEL-23-0.00-1.58 105619~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: DEL-36-8.68-8.81 & 8.83-9.04 105619~|~1~|~3~|~03/IMS~|~Interstate Plan Split: FRA-71-28.65-29.90 105619~|~1~|~4~|~04/NHS~|~Priority System NHS Plan Split: FRA-62-8.08-8.52 99703~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Ashtabula, Mahoning, and Trumbull Counties. 121081~|~1~|~1~|~01/STR~|~STP Rural Plan Split 123946~|~1~|~1~|~01/S>2~|~Update sidewalks & curbs 97193~|~2~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation - 4PS7 (100% State) - No CAP - Collision Damage repairs on SFN 3001687, Gue-IR 70-16.55 Not BR Eligible L=133; SD/FO = 0; SR=89.6; DSR=6; 97193~|~1~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Collision repairs on: 1) SFN 4503309, Lic-IR 70-10.77 carrying IR 70 over TR 144 (Swamp Rd) 97193~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4ps7 (10% State) - No CAP - Collision repairs on: 1) SFN 3002462, Gue-IR 77-01.43 carrying IR 77 over SR 313; 84979~|~1~|~1~|~01/ERD~|~Streetscape improvements: Misc. curb and walk replacement, decorative lighting, streetscape trees and new signal @ Fire Station from Buck Creek Bridge to Main Street. 87279~|~1~|~1~|~01/NHS~|~BRO SR32 15.29 - 19.83 On SR32, 1.5 mile west of US62 and continue east for 4.48 miles and terminate at the Adams County line (SLM 15.29 to 19.83), it is proposed to resurface the highway with asphalt concrete.80/20 split 01/NHS/PV/State 97904~|~1~|~1~|~01/CMQ~|~Belmont Park - construction of a new asphalt bike path that will go through and around Belmont Park, connecting the park and Lohrey Recreation Center to the surrounding community and nearby bike paths. The project will also add bike racks and benches and other bike amenities that will be available for use by the riders of the proposed path. 96696~|~1~|~1~|~01/NHS~|~Plan split to include all bridge work and approach roadway work necessary to rehabilitate the structure. Lighting and the City's requested aesthetic/striped paint on the fascia beams. 106085~|~1~|~2~|~02/S<2~|~Marion Urban Area Plan Split: MAR-739-6.78-7.78 106085~|~1~|~3~|~03/S<2~|~Urban Paving Plan Split, City of Marion: MAR-739-7.78-9.41 106085~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-739-3.61-6.78 98633~|~1~|~1~|~01/BRO~|~SFN 7501331 SHE-66-0834 - remove asphalt wearing surface and water proofing from non-composite box beam structure. Repair or replace fascia beams. Install SDC hard overlay (non-composite). Repair pier caps and encase pier columns. SFN 4601424 LOG-47-2294 Remove asphalt wering surface and water proofing and install SDC hard overlay. Encase pier columns & patch structural T-joints. 116156~|~1~|~1~|~01/STR~|~Microsurfacing 99617~|~1~|~1~|~01/NHS~|~Rehabilitate bridge COL 154 0131 (SFN 1503367) by replacing superstructure 113479~|~1~|~1~|~01/MPO~|~Improvements include asphalt pavement repairs, asphalt milling and resurfacing, installation of trail erosion protections and installation of trail drop-off safety protections. 111486~|~1~|~1~|~01/NHS/GENE~|~Resurfacing, urban paving in the city of Geneva. 99436~|~1~|~1~|~01/NHS~|~Split for all pavement work for the entire project. 99436~|~1~|~2~|~02/NFP~|~Work not elgible for state participation. 102205~|~1~|~1~|~01/STR~|~LAW CR 4 5.32 ER Slide Repair. 88884~|~1~|~1~|~01/STR~|~Plan split for ATB US 6 from 0.00 to 1.54 and ATB US 322 from 0.00 to 8.11. 88884~|~1~|~2~|~02/STR~|~See linked structures > 20' span. 88884~|~1~|~3~|~03/STR~|~See linked structure 10' to 20' span. 97720~|~1~|~1~|~01/MPO~|~Resurface Munn Road using local funds. 77727~|~1~|~1~|~01/NHS~|~Concrete deck overlay project on bridges HOC 93 12.43 (SFN 3702138). NHS route funded 80 Federal/20 State. 77727~|~1~|~2~|~02/S<2~|~Concrete deck overlay project on bridges HOC 93 12.34 (SFN 3702103). Urban federal aid funded 80 Federal/20 State. 105504~|~1~|~1~|~01/SAF~|~District wide pavement markings/RPMs 105504~|~1~|~2~|~02/SAF~|~Install center line rumble stripes on CLI SR 73 0.00-6.24, CLI US 22 2.62, CLI US 68 16.79-20.12, and WAR US 22 19.24. 99691~|~1~|~1~|~01/NFP~|~Constructing road improvements to support expansion of L-3 Fuzing and Ordnance and Multi-Color Corporation. 99691~|~1~|~2~|~02/NFA~|~Constructing road improvements to support expansion of L-3 Fuzing and Ordnance and Multi-Color Corporation 109203~|~1~|~1~|~01/NFP~|~STA Schroer Group (TSG). 120770~|~1~|~1~|~01/BRO~|~Rehabilitate structure carrying SR 43 over Goose Creek. 109391~|~1~|~1~|~01/ENH~|~Plans Split for Bike Lane addation 109391~|~1~|~2~|~02/NFP~|~100% County funded 104284~|~1~|~1~|~01/NFP~|~Pruning Trees/Brush Removal 91657~|~1~|~1~|~01/NHS~|~Reconstruct and Widen US 224 in Willard 91657~|~2~|~2~|~02/NHS~|~100% City of Willard Items 118621~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV 86931~|~1~|~1~|~01/STR~|~7203306 SAN SR590 1.22 Intersect: Winters Ditch 118986~|~1~|~1~|~01/NHS~|~added plan split. 118986~|~1~|~2~|~02/NHS~|~100% local share of the project. 114124~|~1~|~1~|~01/NHS~|~Culvert replacement project. WAS 7 28.98 (CFN 1885082). 106399~|~1~|~1~|~01/NHS~|~Plan Split 91986~|~1~|~1~|~01/STR~|~Removal and replacement of culvert with minimum approach work on SFN 0601209 AUG 66 1704 over the Miami & Erie Canal. 118754~|~1~|~1~|~01/STR~|~added plan split. 123797~|~1~|~1~|~01/S5K~|~STP 5K to 50K 123797~|~1~|~2~|~02/STR~|~workplan 106691~|~1~|~1~|~01/SAF~|~District Preservation - 100% State (4PS7) - replacement of school zone flashers within District 5. 114159~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..at various locations in D10. 107618~|~1~|~1~|~01/NHS~|~SCI 52 33.11 Culvert liner 105210~|~1~|~4~|~04/STR~|~Bridge preventive maintenance > 20' span. 105598~|~1~|~1~|~01/STR~|~Bridge Repairs. 124264~|~1~|~1~|~01/ENH~|~Programming project. 115039~|~1~|~1~|~01/NFP~|~Split for work on Tower B 120055~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing Municipal Bridge (4R87) funds at 100% (Off-System Eligible) up to the Federal CAP. 121025~|~1~|~1~|~01/NFP~|~culvert maintenance. 105253~|~1~|~2~|~02/STR~|~Bridge preventive maintenance >20' span. 105253~|~1~|~1~|~01/STR~|~Resurfacing. 96806~|~1~|~1~|~01/NFA~|~It is proposed to do a resurfacing and chip/seal at the Kincaid Fish Hatchery in Pike County. 107970~|~1~|~3~|~03/STR~|~Minor bridge work to be completed with FDR project 107970~|~1~|~1~|~01/STR~|~Full Depth Reclamation with Widening:ASD 545 00.00-05.46RIC 545 10.508-11.48 107970~|~1~|~2~|~02/SAF~|~Construction associated with installing Buggy Lanes 82927~|~1~|~3~|~03/NHS~|~Plan Split for SFN 7606125 STA SR 241 04.22 over US 30 82927~|~1~|~4~|~04/STR~|~SFN 7606087 STA SR 241 3.96 over Pigeon Run. 82927~|~1~|~6~|~06/S>2/MAS1~|~STA SR 241 from 6.01 to 7.86 (80/20 funding split) 82927~|~1~|~2~|~02/S>2~|~Plan Split for STA SR 241 from 4.16 to 6.01 82927~|~1~|~5~|~05/S>2~|~Plan Split for SFN 7606176 STA SR 241 07.66 over Tuscarawas River and Railroads. 82927~|~1~|~1~|~01/STR~|~Plan Split for STA SR 241 from 3.64 to 4.16 82927~|~1~|~7~|~07/S>2/MAS2~|~STA SR 241 from 6.01 to 7.86 (100% city) 97734~|~1~|~1~|~01/NFP~|~Added due to moving subphase to CO Contract 124544~|~1~|~1~|~01/STR~|~Reconstruction. 123646~|~1~|~1~|~01/NFP~|~Plan split for brush and tree removal 110068~|~1~|~1~|~01/NFP~|~Bridge Elec. plan split 121110~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum. 100864~|~1~|~1~|~01/NHS~|~ADA 52 13.10-16.14 100864~|~1~|~2~|~02/NFA~|~ADA 247 0.00-0.32 100864~|~1~|~3~|~03/STR~|~ADA 247 0.32-0.35 121456~|~1~|~1~|~01/S>2~|~Resurfacing. 121456~|~1~|~2~|~02/S>2/WARR~|~Resurfacing, urban paving in the City of Warren. 121456~|~1~|~3~|~03/S>2/NILE~|~Resurfacing, urban paving in the City of Niles 116706~|~1~|~1~|~01/NHS~|~Resurfacing. 109961~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County. 93240~|~1~|~1~|~01/MPO~|~Streetscape which includes decorative pavers, new sidewalk, curb bump-outs, ADA ramps, new curbs, pavement and underground electric with decorative light poles on East Main Street from Walnut Street to Mulberry Street. 110130~|~1~|~1~|~01/STR~|~Bridge ReplacementPIK CR 57 03.47 (SFN 6630715) 107017~|~1~|~1~|~01/NFA~|~The County will construct improvements on Urbana Rd between Tremont City Rd and Willow Road. 105931~|~1~|~1~|~01/SAE/MCEO~|~"01/SAE/OT/MCEO" - Muskingum County Engineer pavement marking project funded by CEAO with federal max of $150,000 124310~|~1~|~1~|~01/ERD~|~Plan split for earmark funding for W State St - Front St to Rawson Ave. 104919~|~1~|~1~|~01/NFA~|~Perry Township truck replacement project 118692~|~1~|~1~|~01/ENH/STPK~|~Bridge Replacement. 101512~|~1~|~1~|~01/SAF~|~Intersection realignment project. HOC 278 10.70/HOC 595 2.95. 115749~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving 115749~|~1~|~2~|~02/S>2/HAM~|~Plan Split for the 100% City items on the urban paving route 94536~|~1~|~1~|~01/NFP~|~100% State funding split using Geologic Site Management funds. 102486~|~1~|~1~|~01/NHS~|~Minor rehab of pavement for COL-30 105273~|~1~|~2~|~02/S<2~|~Smooth seal on small urban routes: CHP SR 29 SLM 17.63 to 17.87 105273~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CHP SR 29 SLM 15.72 to 16.63 & SLM 16.63 to 17.63 109238~|~1~|~2~|~02/STR~|~HUR SR 0162 22.85-Replace culvert HUR SR 0013-06.01-Pave culvert invert 109238~|~1~|~1~|~01/S<2~|~HUR SR 0099 Culvert Replacement 110406~|~1~|~1~|~01/S>2~|~FY23 Urban Paving on SR 747 in Springdale. This plan split is for the items paid by both ODOT and the City. 110406~|~1~|~2~|~02/S>2/SPD~|~This plan split is for all items to be paid 100% by the City. 110406~|~1~|~3~|~03/S>2/DAP~|~this plan split is for the section of roadway that falls outside of Springdale jurisdiction and into Glendale. to be paid 100% by ODOT. 102737~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the City of Akron. 102737~|~1~|~3~|~03/S>2/AKRO~|~Resurfacing, urban paving in the City of Akron. 102737~|~1~|~5~|~05/S>2~|~Minor bridge work > 20' span. 102737~|~1~|~2~|~02/NHS/AKRO~|~100% Akron items such as full and partial depth repairs and ADA curb ramps. 102737~|~1~|~4~|~04/S>2/AKRO~|~100% Akron items such as full and partial depth repairs and ADA curb ramps. 118112~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds 118112~|~2~|~2~|~02/SAF~|~Plan Split for Safety-funded scope to add raised curb media and U-turn lane on McCord Rd 118112~|~3~|~3~|~03/MPO~|~Plan Split for Transportation Alternatives funding to add side path along north side of SR-2 95105~|~1~|~1~|~01/ERD~|~100% federal funding using earmark id no. FL1201 for the stream relocation along Riverview Road to prevent erosion from undermining the pavement due to flooding in the City of Brecksville. 99681~|~1~|~1~|~01/NHS~|~Resurfacing work funded at 80% federal and 20% state. 99681~|~1~|~2~|~02/SAF~|~New plan split for rumble striping along the project length. 100915~|~1~|~1~|~01/NHS~|~Microsurface NHS route in Auglaize County. 100915~|~1~|~2~|~02/S<2~|~Microsurface various STP small urban routes in Auglaize County 100915~|~1~|~3~|~03/STR~|~Microsurface STP rural routes in Auglaize County 92561~|~1~|~2~|~02/S>2~|~SFN 6704832 POR-IR 480-0078 bridge widening. 92561~|~1~|~1~|~01/S>2/Stre~|~Construct left turn lanes along all signalized intersections of Frost Road, upgrade all existing traffic signals, in the City of Streetsboro, Portage County, Ohio. 92561~|~1~|~4~|~04/NFP~|~Bridge aesthetics on SFN# 6704832. 92561~|~1~|~3~|~03/S>2~|~100% Local split to cover waterline work. 108243~|~1~|~1~|~01/IMS~|~Slope stabilization treatment at IR-480 locations using GSM funds with a 90% federal and 10% state participation split 108957~|~1~|~1~|~01/SAF~|~The project consists of changing pedestrian signals to countdown signal, installing ladder style crosswalk markings, and replacing damaged walk and curb ramps. 90639~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds. 114771~|~1~|~1~|~01/IMS~|~R/W Fencing Replacement 117646~|~1~|~1~|~01/STR~|~Landslide repair 117375~|~1~|~1~|~01/BRO~|~Complete structure replacement utilizing CEAO BFP Federal (4B87) funds at 100% up to maximum of $1,695,000. 84756~|~1~|~1~|~01/ENH~|~Construct a 14' wide bikeway/pedestrian bridge over the Great Miami River to connect sections five and six in Miami County's Trail system. Construct a segment of bikeway running North on the East side of the River to connect sections five and six in Miami County's Trail system in Staunton and Washington Townships, approximately 1600' South of Peterson Road. 104709~|~1~|~1~|~01/SAF~|~Pre-signal 100533~|~1~|~1~|~01/NHS~|~Repair highway lighting circuit (two locations) and remove sign lights on two signs on US 23 bridge over Eastern Ave.ROS 23 9.92-11.15ROS 35 18.51 (35 & 104 Intersection). 122193~|~1~|~1~|~01/BRF~|~Bridge Exchange plan split 90911~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal rural STP funds. 115358~|~1~|~1~|~01/MPO~|~Resurfacing. 116634~|~1~|~1~|~01/NFA~|~Pruning Project. 116791~|~1~|~1~|~01/IMS~|~MOWING 82844~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project. WAS SR 555 1.25-7.71. Rural other federal aid funded 80 federal/20 state. 82844~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project. WAS SR 555 0.00-1.25. Urban other federal aid funded 80 federal/20 state. 100191~|~1~|~1~|~01/STR~|~Landslide repair project. VIN 50 1.40. DSR VIN-001. Funded 100% federal. 116962~|~1~|~1~|~01/MPO/BARB~|~Resurfacing. 100659~|~1~|~1~|~01/STR~|~plan split for the rural sections of the project. This includes SR 730: SLM 3.98 - 9.02. And both SR 730 AC, and SR 730CC. 100659~|~1~|~2~|~02/S5K~|~plan split for the small urban portion of CLI-730 between SLM 9.02-10.09 105003~|~1~|~1~|~01/NFP~|~Split for culvert replacement and drainage upgrade 123129~|~1~|~1~|~01/IMS~|~Resurfacing with asphalt concrete 123129~|~1~|~2~|~02/NHS~|~Resurfacing with asphalt concrete 123129~|~1~|~3~|~03/S5K~|~Resurfacing with asphalt concrete 123129~|~1~|~4~|~04/STR~|~Resurfacing with asphalt concrete 123129~|~1~|~5~|~05/NFA~|~Resurfacing with asphalt concrete 93108~|~1~|~1~|~01/STR~|~District Allocation 93108~|~1~|~3~|~03/S<2~|~Urban Split - SLM 3.45 - 4.74 93108~|~1~|~2~|~02/STR~|~Maintenance work on 2 structures 84527~|~1~|~1~|~01/S<2~|~LOR-254-00.40 - 02.83 Project includes pavement repairs, resurfacing with asphlat concrete, adjsuting castings where ncessary, placement of pavement markings and minor structure maintenance. 115683~|~1~|~2~|~02/STR~|~Recessed Wet Reflective Pavement Markings for Rural Routes 115683~|~1~|~3~|~03/S5K~|~Recessed Wet Reflective Pavement Markings Urban 115683~|~1~|~1~|~01/NHS~|~Recessed Wet Reflective Pavement Markings on NHS (OTT-2, SAN-6 from 14.61 - 18.458, SAN-20) 115683~|~1~|~4~|~04/IMS~|~Plan split for pavement markings on Interstate (LUC-475) 124429~|~1~|~1~|~01/IMS~|~Bridge preventative maintenance work on interstate bridge 124429~|~1~|~2~|~02/NHS~|~Plan split for bridge preventative maintenance work on NHS system 99754~|~1~|~1~|~01/IMS~|~ LUC-75-0130 (SFN: 4802853) LUC-75-0139 (SFN: 4802888) LUC-75-0167L (SFN: 4802942) LUC-75-0167R (SFN: 4802977 122714~|~1~|~1~|~01/NFA~|~All cul-de-sac work included in this split. 98591~|~1~|~1~|~01/SAF~|~Lengthen EB left turn lane and add a new WB right turn lane on HOC 33 2.38. Funded 90 federal/10 state. 112677~|~1~|~1~|~01/NHS~|~Overlay of MAR-23 over SR529 112677~|~1~|~2~|~02/NHS~|~Work on US 23 bridge over SR95 112677~|~1~|~3~|~03/S5K~|~Bridge work on SR 529 over Graves Creek 93808~|~1~|~1~|~01/NFP~|~Project uses only SAC 4MA7 funds. 105217~|~1~|~1~|~01/S>2~|~Rehab bridge size culvert on Lg. Urban Route . 105217~|~1~|~2~|~02/S>2/PARK~|~Plan split for HAM Parks portion of the project. 105217~|~1~|~3~|~03/S>2/ODNR~|~Plan split for ODNR portion of the project. 118629~|~1~|~1~|~01/ENH~|~Remove sodium lights & replace with LED lights 90991~|~1~|~1~|~01/STR~|~3503135 HEN SR109 18.2 Intersect: Maumee River 95527~|~1~|~1~|~01/MPO~|~MORPC STP & Westerville funding for Sunbury Rd widening 97773~|~1~|~2~|~02/BRF~|~Bridge replacement project. ATH CR25 7.53 (SFN 0534706). Funded through the OBPP. 97773~|~1~|~3~|~03/BRF~|~Bridge replacement project. ATH TR343T 0.65 (SFN 0543632). Funded through the OBPP. 97773~|~1~|~1~|~01/BRF~|~Bridge replacement project. ATH CR24C 1.35 (SFN 0534404). Funded through the OBPP. 97773~|~1~|~5~|~05/BRF~|~Bridge replacement project. ATH TR265T 0.25 (SFN 0547697). Funded through the OBPP. 97773~|~1~|~4~|~04/BRF~|~Bridge replacement project. ATH TR229T 0.85 (SFN 0545511). Funded through the OBPP. 111193~|~1~|~1~|~01/MPO~|~MPO funded plan split 111193~|~1~|~3~|~03/S5K~|~Urban Paving plan split 111193~|~1~|~4~|~04/NFP~|~Plan Split for 100% locally funded scope items, such as pavement repair, sidewalk, curb and gutter on Urban Paving funded segments of road and any non-eligible items on MPO funded road segment. 111193~|~1~|~5~|~05/SAF~|~Safety funded scope for PHB's 111193~|~1~|~2~|~02/MPO~|~MPO funded SUP 101336~|~1~|~1~|~01/NHS~|~Plan split for all work associated with OTT-2-0037 bridge replacement 107258~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail on various county roads 124713~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation of federally eligible bridge on the interstate system. 121638~|~1~|~1~|~01/S5K~|~Traffic signal system upgrades and optimization utilizing Federal Carbon Reduction Funds (4CU7) at 80% up to Federal CAP. 115616~|~1~|~1~|~01/SAF~|~Install centerline raised pavement markers for the entire length of Zimmerman Road and Storms Creek Road 90962~|~1~|~1~|~01/BRF~|~Project involves replacement of the structurally deficient Bridge No. PRE-TR 218-0020 (SFN: 6836402), which carries Concord-Fairhaven Road (TR-218) over Four Mile Creek. Work includes minor approach work, pavement repairs, and vertical alignment adjustments. 105059~|~1~|~2~|~02/NHS~|~Microsurfacing. 105059~|~1~|~4~|~04/STR~|~Microsurfacing. 105059~|~1~|~1~|~01/IMS~|~Double microsurfacing. 105059~|~1~|~3~|~03/S5K~|~Microsurfacing. 76796~|~1~|~1~|~01/IMS~|~100% UNFU plan split 120377~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established 88999~|~1~|~1~|~01/BRO~|~Bridge replacement 90521~|~1~|~1~|~01/CMQ/STA~|~Plan Split for construction of roundabout, for STA CR 252 from 3.10 to 3.30 103283~|~1~|~1~|~01/MPO~|~Construct New Sidewalks on south side of Dobbins Road in Poland Township between Administrative building drive to Tuscany Drive, approximately 2,100 ft. 87515~|~1~|~1~|~01/NHS~|~Pile encasement on bridges HOC US 33 13.13 LT and RT. SFN 3700690(L) and 3700720(R). NHS route funded 80 federal/20 state. 87515~|~1~|~2~|~02/BRO~|~Bridge replacement project on HOC US 33 15.13 RT, SFN 3700879. BR eligible. 101899~|~1~|~1~|~01/BRF~|~Bridge replacement. 116417~|~1~|~1~|~01/BRF~|~Replacement of SFN 2576244 122099~|~1~|~1~|~01/IMS~|~Plan Split for Safety upgrades at the intersection of IR-71 and Pearl RD 98097~|~1~|~1~|~01/NFA~|~Non-Fed Aid 100% State SLM 5.52 to 10.51 98097~|~1~|~2~|~02/S<2/WCH~|~STP Urban Paving WCH 80/20 SLM 11.66 to 12.58 98097~|~1~|~3~|~03/STR~|~STP Rural 80/20 SLM 10.51 to 10.62 98097~|~1~|~4~|~04/S<2~|~STP < 200,000 paving SLM 10.62 to 11.66 and 12.58 to,12.78 98097~|~1~|~5~|~05/NFA~|~Bridge deck patching and sealing. Non Federal-Aid. 100% State 98097~|~1~|~6~|~06/S<2~|~Bridge deck patching and sealing on two structures 110257~|~1~|~1~|~01/MPO~|~Widen Wayne Avenue from Wyoming Street to Waldo Avenue from four lanes to five lanes. The project includes new sidewalks, curbs, street pavement and street lighting. 104642~|~1~|~2~|~02/NFA~|~Resurfacing Niles-Vienna Rd from 4.96 to 5.51. 104642~|~1~|~1~|~01/MPO~|~Resurfacing of Niles-Vienna Road from 1.44 to 4.96. 83708~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using a chip seal treatment. MOE 260 0.00-4.33 and WAS 260 0.48-9.76 and 9.98-11.00. Not on any federal aid system funded 100% state. 122310~|~1~|~4~|~04/NFP~|~Plan split for non-eligible work at 100% cost to the City. 122310~|~1~|~2~|~02/S>2~|~Plan split for resurfacing of STP>200,000 122310~|~1~|~3~|~03/ENH~|~Plan Split for work items eligible for Transportation Alternative Funding 122310~|~1~|~1~|~01/NHS~|~Plan split for resurfacing NHS route. 85314~|~1~|~1~|~01/STR~|~SR45 11.07; installation of new and replacement sidewalks from water street to high street. SAC description (4SC7) for safe routes to school. 95805~|~1~|~1~|~01/NFA~|~Not on the federal aid system, COL-558-0.67 and various other sites for culvert repair/replacement. 124560~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded roundabout work 110602~|~1~|~1~|~01/NFP~|~Split for lighting upgrade on the interstate system 101252~|~1~|~1~|~01/S<2~|~ederal/Local Urbanized Area Inside Corp. Limit (Paving Items):HUR-SR-269 ? SLM 05.49 to 05.730(Rt) SLM 05.83 to 05.870(Lt) SLM 06.03 to 06.120(Rt)HUR-SR-269 ? SLM 05.730 to 05.83 SLM 05.870 to 06.03 SLM 06.120 to 08.09ERI-SR-269 ? SLM 00.220 to 00.39(Rt)HUR-SR-113 ? SLM 01.040 to 01.08(Rt)HUR-SR-113 ? SLM 01.740 to 01.84(Rt)ERI-SR-269 ? SLM 00.000 to 00.22HUR-SR-113 ? SLM 00.970 to 01.04HUR-SR-269D?SLM 00.000 to 00.76 101252~|~1~|~2~|~02/S<2/BELV~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):HUR-SR-269 ? SLM 05.49 to 05.730(Rt) SLM 05.83 to 05.870(Lt) SLM 06.03 to 06.120(Rt)HUR-SR-269 ? SLM 05.730 to 05.83 SLM 05.870 to 06.03 SLM 06.120 to 08.09ERI-SR-269 ? SLM 00.220 to 00.39(Rt)HUR-SR-113 ? SLM 01.040 to 01.08(Rt)HUR-SR-113 ? SLM 01.740 to 01.84(Rt)ERI-SR-269 ? SLM 00.000 to 00.22HUR-SR-113 ? SLM 00.970 to 01.04HUR-SR-269D?SLM 00.000 to 00.76 101252~|~1~|~4~|~04/S<2~|~Federal/State: Bridge WorkHUR-SR-269 06.590 101252~|~1~|~3~|~03/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?):HUR-SR-269 ? SLM 05.490 to 05.73(Lt) SLM 05.830 to 05.87(Rt) SLM 06.030 to 06.12(Lt)ERI-SR-269 ? SLM 00.220 to 00.39(Lt)HUR-SR-113 ? SLM 01.040 to 01.08(Lt)HUR-SR-113 ? SLM 01.080 to 01.74HUR-SR-113 ? SLM 01740 to 01.84 91910~|~1~|~1~|~01/BRO~|~Rehabilitate Bridge HAM-71-1717 (Cornell Rd. Over I-71) by replacing the deck, eliminating the hinge, and perfroming other related rehabilitation work. SFN: 3107418 and intersect: C256(Cornell Road) 102591~|~1~|~1~|~01/NFP~|~Access control/intrusion and CCTV, fencing and one Autogate. 123448~|~1~|~1~|~01/NHS~|~Corridor pedestrian safety and traffic calming improvements 97692~|~1~|~1~|~01/NFP~|~"01/NFP/OT" established for construction of new county garage, new 1500 ton salt dome, and new wash bay at existing county garage location. 89484~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various routes in Darke County on DAR CR 51 8.33 to 11.82 segment length 3.49 total lane miles 6.98. 89484~|~1~|~2~|~02/NFA~|~Upgrade existing pavement markings on various routes in Darke County on DAR CR 51 0.00 to 8.33 96289~|~1~|~1~|~01/STR~|~Off SR93 on CR169 (Ellisonville-Smoky Row Rd) it is proposed to replace the structure (SFN 4401425). 87257~|~1~|~1~|~01/STR~|~D6 funded bridge replacementSFN 8002797 ; UNI SR-245 ; Bridge over Big Darby Creek01/STR/BR/ 117805~|~1~|~1~|~01/NFP/NALB~|~Plan Split 01/NFA/OT/NALB 99624~|~1~|~1~|~01/NFP~|~Provide fiber optic splices at various locations 111347~|~1~|~1~|~01/NFP~|~ODNR project to microsurface parts of R-4 and F-5 parking lot in Burr Oak State Park. Funded 100% State. 93235~|~1~|~1~|~01/MPO~|~Construct three bikepath ramps from the city streets to the Great Miami River Trail. Southeast corner of the West Fifth Street Bridge over the Great Miami River, the Southwest corner of the West Fifth Street Bridge over the Great Miami River,and the East side of West Riverview Avenue Great Miami Boulevard. 113011~|~1~|~1~|~01/NFA~|~D09 crack seal project 100974~|~1~|~1~|~01/S<2~|~Smooth seal SR 123 in Montgomery County: MOT SR 123 SLM 0.00 to 2.08 95416~|~1~|~1~|~01/SAF/HIG~|~It is proposed, using CEAO Safety funds, to install new and upgrade existing guardrail on various county roads within Highland County. 100% Fed Safety funds 101346~|~1~|~2~|~02/STR~|~bridge rehab. 101346~|~1~|~1~|~01/STR~|~Resurfacing SLM 9.48-11.05. 85549~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Deck replacement on 3001741 GUE IR70 17.30 Intersect: I-70 Under Cr 73; BR Eligible for Rehabilitation: Length=283 SD/FO(1) SR=55.9 DSR=4 115066~|~1~|~1~|~01/NHS~|~Bridge embankment repair. 113904~|~1~|~1~|~01/STR~|~FDR-ASD SR 603 00.00 to 03.62 101332~|~1~|~1~|~01/STR~|~Reline bridge/culvert. 84202~|~1~|~1~|~01/SAF~|~Two-year guardrail repair (ding and dent) contract for FY 2014 and 2015. 100% State. 88309~|~1~|~1~|~01/NFP~|~This split is for state funds. 104028~|~1~|~1~|~01/ENH~|~Construction of a grade separated pedestrian crossing under Richland Avenue in the City of Athens. Funded 80 federal/15 credit bridge/5 local. 119334~|~1~|~1~|~01/NHS~|~Place holder plan split until locations are added. 110379~|~1~|~1~|~01/SAF~|~Reconfigure intersection of E Main St at S Hamilton Rd 89170~|~2~|~3~|~03/ENH~|~Added Plan Split for the CE of the 100% local item for the gas valve box being adjusted to grade 89170~|~2~|~2~|~02/ENH~|~Added Plan Split for 100% Local Item (Gas valve box adjusted to grade) in the amount of $2,750.00 89170~|~1~|~1~|~01/MPO~|~Bicycle path 106228~|~1~|~1~|~01/S>2~|~In the City of Cincinnati, improve pedestrian amenities on Harrison Avenue. 96572~|~1~|~1~|~01/IMS~|~fix accident damage to WOO-75-1294, sfn 8703698 83722~|~1~|~1~|~01/NFP~|~Metro Park funding to construct turn lanes on DEL-750/Powell Rd to Dragonfly Day Camp at High Banks Metro ParkLocal Sponsor - FRA County Metroparks 100664~|~1~|~1~|~01/SAF~|~"01/SAF/OT/ " - Safety Program - Approved for $840,813 (4HJ7-90% Federal) / (4Bc7-10% State) - Safety project on US 62 and SR 661 to install a traffic signal, turn lanes on US 62, and profile corrections on SR 661. 105709~|~1~|~1~|~01/STR~|~Plan split for paving work 93438~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Darrow Road from Gilchrist Road to Eastwood Avenue, in the City of Akron. 123016~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order. 123228~|~1~|~1~|~01/STR~|~100' of landslide repair SR 78-22.90 mm. 105293~|~2~|~2~|~02/NFA~|~Split for conduit replacement at HOL-515-3.52. 105293~|~1~|~3~|~03/NFA~|~Bridge maintenance work 105293~|~1~|~1~|~01/NFA~|~Full depth reclamation of HOL-515 91868~|~1~|~2~|~02/MPO/RICH~|~Rehab Elm Street Bridge 91868~|~1~|~1~|~01/MPO/RICH~|~Replacing Union Street Bridge - Rehab Elm Street Bridge 98514~|~1~|~1~|~01/NHS~|~Upgrade school zone flasher assemblies on SR 725 (West Franklin Street) and install new school zone flasher assemblies on Maple Avenue and Iron Gate Park Drive. 120127~|~1~|~1~|~01/SAF~|~Construction of new single-lane roundabout at the intersection of US 62/SR 39 and SR 557 104813~|~1~|~1~|~01/S<2~|~Construction Inspection 106919~|~1~|~1~|~01/MPO~|~Bike Share Program. 116561~|~1~|~1~|~01/IMS~|~Place holder Plan split until locations are selected 116561~|~1~|~2~|~02/NHS~|~Plan split for NHS bridge repairs and associated costs. 94386~|~1~|~1~|~01/STR~|~AC Overlay w/Rpr HUR SR 01.28 - 01.41AC Overlay w/o Rpr HUR SR 01.41 - 01.78 94386~|~1~|~2~|~02/STR~|~Bridge Work to be Determined 101365~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 821 14.10, SFN 6105645. Rural other federal aid funded 80 federal/20 state. 106769~|~1~|~1~|~01/SAF~|~Install roadside detection units, signal and pedestrian upgrades and local smart network infrastructure improvements 93102~|~1~|~2~|~02/IMS~|~See linked structures >20' span. 93102~|~1~|~1~|~01/IMS~|~Resurfacing of STA IR 77 from 17.62 to 18.54 and SUM IR 77 from 0.00 to 4.07. 93102~|~1~|~3~|~03/NHS~|~Minor bridge work to the linked structure. 105098~|~1~|~1~|~01/NFA~|~BRO 286 3.31 culvert replacement. 113822~|~1~|~1~|~01/SAF~|~Intersection improvements at STA SR 43 and Market Street, SR 43 and Mt. Pleasant Street. 113822~|~1~|~2~|~02/SAF/STCE~|~Construct new signal at the intersection of Market St and Mount Pleasant St. 99489~|~1~|~1~|~01/NHS~|~GRE SR 4 1.54 - project is to replace two small culverts under SR 4 - SLM 1.54 with a bridge. Culverts are: Corrugated metal pipe 8' 7" x 5' 11" x 192'. Concrete pipe is 6' diameter. 99489~|~1~|~2~|~02/SAF~|~For safety work to be performed with this project. 112330~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 33 18.48-18.68. Digout and replace with horizontal drains. 100% State Emergency funds. 104658~|~1~|~1~|~01/MPO~|~Resurfacing South Ave (CR 151) from Western Reserve Rd to Presidential Dr. 103842~|~1~|~1~|~01/NFP~|~Resurfacing and other miscellaneous items within Delaware State Park 84589~|~1~|~1~|~01/S<2~|~Bridge Painting/Repair: LOR-113-12.36 / LOR-113-12.47 84589~|~1~|~2~|~02/IMS~|~Bridge Painting/Repair: LOR-480-1.15 / LOR-480-2.04 84589~|~1~|~3~|~03/NHS~|~Bridge Repair: LOR-83-10.78 and LOR-2-9.67 115031~|~1~|~1~|~01/SAF~|~Split for ramp clear work. 99569~|~1~|~1~|~01/MPO~|~Resurfacing of Water Street from Third Street to Washington Street, Resurfacing of Third Street from Wood Street to Water Street 116414~|~1~|~4~|~04/SAF~|~Safety funded pedestrian enhancements at the SR 241/SR 687 intersection. 116414~|~1~|~1~|~01/NHS~|~Signal replacement at Strausser. 116414~|~1~|~3~|~03/STR~|~Signal cabinet upgrade/replacement at POR SR 14/SR 183. 116414~|~1~|~2~|~02/S>2~|~Signal replacement at MAH SR 7/Buena Vista Ave, span wire sign support replacement on STA SR 172. 116009~|~1~|~1~|~01/NFP~|~Tree Cutting. 93610~|~1~|~1~|~01/SAE~|~100% federal funding for Safet Routes to School eligible work items. 87307~|~1~|~1~|~01/STR~|~generaly system resurfacing of JEF-213-9.70 to 14.81; includes pavement repair and pavement marking 78677~|~1~|~1~|~01/STR~|~Relocate a portion of SR 794 from SLM 0.600 to 1.800 (segment length 1.20 total lane miles 2.40) in the proximity of the OANG (Ohio Air National Guard) Springfiel Base 120822~|~1~|~1~|~01/IMS~|~Culvert replacement 108201~|~1~|~2~|~02/STR~|~Added 2nd Split for Ful CR 23 - CEAO Minor Collector - Special Fed. Billing Code. 108201~|~1~|~1~|~01/STR~|~Plans Split for Resurfacing CR 22 in Fulton County 108201~|~1~|~3~|~03/STR~|~Plan Split for bridge waterproofing to be completed in conjunction with resurfacing 122842~|~1~|~1~|~01/STR~|~Replace existing bridge 116568~|~1~|~1~|~01/STR~|~Plan split for bridge work 107689~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing of S Diamond St and Mill Rd in the City of Ravenna. 118800~|~1~|~1~|~01/STR~|~Full depth roadway reconstruction. 118800~|~1~|~2~|~02/STR~|~Sidewalk work aimed at pedestrian improvements. CMAQ funding split. 113782~|~1~|~1~|~01/IMS~|~Install wrong way signs that use radar technology on various ramps. 113782~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 92876~|~1~|~2~|~02/S>2~|~Resurfacing on a portion of SR 72 outside the Springfield limit. SR 72 SLM 6.77 to 6.81. 92876~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with aspjhalt concrete on CLA SR 72 from 6.77 to 8.32. 92876~|~1~|~3~|~03/S>2~|~This is for extra milling and paving work needed due to a water main repair that was performed during construction. 83409~|~1~|~2~|~02/IMS~|~Bridge Repairs SR 511 over IR 71 ASD-511-10.60/ASD-071-05.27 83409~|~1~|~1~|~01/STR~|~Resurfacing 93096~|~1~|~1~|~01/NHS~|~Reactive Maintenance to perform pavement repairs along RIC 30. 115600~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding 88645~|~1~|~1~|~01/NHS~|~Plan split for resurfacing on US-420 109246~|~1~|~1~|~01/NFA~|~Culvert replacement at HOL-60-2.99. 107451~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural routes: DAR SR 185 SLM 0.00 to 4.92 DAR SR 503 SLM 0.00 to 0.80DAR SR 503 SLM 0.80 to 7.70 107451~|~1~|~2~|~02/NFA~|~AC Overlay with repairs on NFA route:DAR SR 503 SLM 7.70 to 9.29 121904~|~1~|~1~|~01/MPO/NFRA~|~Resurfacing. 115493~|~1~|~1~|~01/NFP~|~District wide herbicidal spray project. 119079~|~1~|~1~|~01/NHS~|~Plan split for project to rehabilitate bridge GRE-844-0067 with carries North Fairfield Rd over SR 844. Rehab will retrofit the expansion joints, repair barriers, patch wearing surface, and replace abutment bearings. 105513~|~1~|~1~|~01/NHS~|~US 33 from 12.59 to 24.30 (NHS) pavement resurfacing and repairs 105513~|~1~|~2~|~02/NHS~|~Minor repairs on several bridges 105513~|~1~|~3~|~03/NHS~|~Resurfacing within rest area 105513~|~1~|~4~|~04/SAF~|~Installation of RWR pavement markings 105513~|~1~|~5~|~05/NHS~|~Minor repairs on UNI-33-22.11 (SFN 8001472) 107474~|~1~|~1~|~01/STR~|~AC Overlay with repairs 110704~|~1~|~1~|~01/STR~|~All items associated with crack sealing on MRW-71 108773~|~1~|~1~|~01/NFA~|~"01/NFA/BR/CRNG" - 95% Federal (5MP7) and 5% Local (4BG7) - replacement of bridge (SFN 6461336) carrying Adams Street over tributary of Sunday Creek. 122079~|~1~|~1~|~01/BRF/HUR~|~Bridge Replacement 113209~|~1~|~1~|~01/MPO/ALLI~|~Intersection improvement at STA US 62 and Beechwood Ave/Sawburg Ave, in the City of Alliance. 113209~|~1~|~2~|~02/SAE/ALLI~|~Signal controllers and timeclocks. 120119~|~1~|~1~|~01/NFA~|~Created for TID involvement 124805~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance. 124805~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance. 124805~|~1~|~3~|~03/S>2~|~Bridge preventive maintenance. 101379~|~1~|~1~|~01/IMS~|~Bridge rehabilitation > 20' span. 101379~|~1~|~3~|~03/NHS~|~Bridge rehabilitation > 20' span. 101379~|~1~|~2~|~02/IMS~|~Minor bridge rehab 10' to 20' structure. 101379~|~1~|~5~|~05/STR~|~Bridge rehabilitation > 20' span. 101379~|~1~|~4~|~04/S>2~|~Minor bridge rehab 10' to 20' structure. 101379~|~1~|~6~|~06/STR~|~Minor bridge rehab 10' to 20' structure. 107243~|~1~|~1~|~01/S<2~|~Slide Repair on LAW 7 1.62 107585~|~1~|~1~|~01/NHS~|~Lighting Maintenance project. Replacement of poles, luminaires, wiring, power supply equipment. FY 2022. 80% Federal and 20% State funds. 107585~|~1~|~2~|~02/S<2~|~Lighting Maintenance project. Replacement of poles, luminaires, wiring, power supply equipment. FY 2022. Funded 80% Federal/20% State. 100972~|~1~|~1~|~01/IMS~|~Construction Inspection 98345~|~1~|~2~|~02/NFA~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Guardrail upgrades for Kno-205-(0.26 to 6.94) 98345~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail Upgrade in District 5. Cos-36-(0.00 to 10.05), Cos-541-(15.00 to 16.00) 98345~|~1~|~3~|~03/SAF~|~Safety Program - 4HJ7 (100% Federal) - See CAP Comments - Iinstallation of cable barrier along Mus IR 70 between SLM points 5.13 to 7.13. 93708~|~1~|~1~|~01/NFA~|~Type B emergency to do pavement repairs on: DEL-257: 8.37-22.62 MAR-257: 0.00-0.65 113624~|~1~|~1~|~01/SAF~|~Install pedestrian signals and improve intersections with crosswalk markings and signage. 94131~|~1~|~1~|~01/STR~|~Resurfacing of POR SR 700 from 0.00 to 4.54 and 5.82 to 7.89. 94131~|~1~|~2~|~02/S<2~|~Resurfacing POR SR 305 from 0.00 to 0.48 and POR SR 700 from 5.26 to 5.82. 94131~|~1~|~3~|~03/STR~|~See linked structure, >20' span. 94131~|~1~|~4~|~04/MPO/Hram~|~Curb ramp reconstruction, installing a retaining wall and catch basin reconstruction. 114310~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - 100% State Funded (4PS7) - district wide mowing contract. 102589~|~1~|~1~|~01/STR~|~DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. All work on US 224 in Hancock County which is from the Putnam County Line to SR 235. Work on US 224 in Putnam County from SLM 23.16 to the Hancock County Line at 29.61. District Preservation Program funds. 102589~|~1~|~2~|~02/NHS~|~DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work on US 224 in Putnam County from the CSX RR crossing at 21.40 to 23.16. Work on SR 65 in Allen County on SR 117 from the corporation limits of the City of Lima at 18.20 to the concrete pavement just east of Leonard Avenue at 18.30. Work on US 127 in Van Wert County from the corporation limits of the City of Van Wert at 11.33 to 11.63 on the right side of the road and from 11.33 to 11.43 on the left side of the road. District Preservation Program funds. 102589~|~1~|~3~|~03/NHS/VANW~|~DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work on the NHS in the City of Van Wert. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Van Wert. Work on US 127 in Van Wert County on both sides of the road from the CSX railroad at 9.94 to the corporation limits of the City of Van Wert at 11.33 and on the left side of the road from 11.43 to 11.63. 124382~|~1~|~1~|~01/MPO~|~Plan split for rehabilitation and resurfacing work on Fulton Road with NOACA funding 109862~|~1~|~1~|~01/NHS~|~Sealing concrete bridge decks throughout D11 on NHS Routes. 109862~|~1~|~2~|~02/STR~|~Bridge deck sealing for SR 148 (Non-NHS) in Belmont County. 101194~|~1~|~1~|~01/BRO~|~District Preservation Program funds. 95372~|~1~|~1~|~01/STR~|~See linked structures >20' span. 93006~|~1~|~3~|~03/IMS~|~District Preservation Culvert Funding - 4PF7 (Federal 90%) / 4PS7 (State 10%) - No CAP - Culvert work associated with interstate rehabilitation. 93006~|~1~|~4~|~04/S<2~|~District Preservation Other Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Upgrade of traffic signal detection, signs, and other roadway appurtenances along SR 60 and SR 60G. 93006~|~1~|~5~|~05/SAF~|~Recessed-Wet Reflective Safety Stripin Initiative - 4HJ7 (100% Federal) - No CAP - Straight Line striping initiative for Interstate and Muliti-Lane roadways 93006~|~1~|~1~|~01/IMS~|~Major Rehabilitation Funding - 4RA7 (100% State) - See CAP Comment - Pavement Rehabilitation work associated with major reconstruction. 93006~|~1~|~2~|~02/IMS~|~Major Rehabilitation Funding - 4RA7 (100% State) - See CAP Comment - Bridge rehabilitation work associated with major reconstruction. 93006~|~1~|~6~|~06/IMS~|~District Preservation- 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge replacement work associated with major reconstruction. 93006~|~1~|~7~|~07/SAF~|~TSMO State Safety Funding - 4SN3 (100% State) - See CAP Comment - Plan Split for the cost to retrofit the Smart Arrow Boards on the project. 93006~|~1~|~8~|~08/SAF~|~Installation of traffic monitoring devices along IR 70. 93006~|~1~|~9~|~09/NFA~|~retroactive fuel price adjustment 116439~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties. 85598~|~1~|~1~|~01/STR~|~80/20 fed/state fund split for all work using federal STP funds. 106168~|~1~|~1~|~01/NFP~|~Work at the Ohio Exposition Center 95341~|~1~|~1~|~01/STR~|~Culvert ProjectO C 000 Other Federal-Aide Highway Major Collector RURALROS -SR -138 6.290 to 6.300 80/20 split 117202~|~1~|~1~|~01/SAF~|~New Sidewalk 106506~|~1~|~1~|~01/NFA~|~This project will improve the intersection of Avon Belden and Mills Road with installing a roundabout. 86659~|~1~|~1~|~01/MPO~|~Widening roadway from 2 to 4 lanes and creating an urban cross section with curb and gutter, sidewalk on both sides of MIA CR 25A from SLM 17.19 to 18.66 86659~|~1~|~2~|~02/CMQ~|~Widening roadway from 2 to 4 lanes, create an urban cross section with curb and gutter, sidewalk on both sides on MIA CR 25A from SLM 17.19 to 18.66. CMAQ funding eligible as project will improve transportation systems management and operations that mitigate congestion and improve air quality. CMAQ Eligibility Approved Partial CO Air Quality Exempt 124356~|~1~|~1~|~01/SAE~|~Roundabout 82970~|~1~|~2~|~02/NHS~|~Deck sealing for structures GRE-35-0455 (sfn 2900211) and GRE-35-0614 (sfn 2900289). 82970~|~1~|~1~|~01/NHS~|~Resurfacing work on GRE-35 and GRE-42 109664~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 103606~|~1~|~1~|~01/S>2~|~Plan split for culvert lining under US 23 & US 42. 81727~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on JEF-7-4.76 to 10.83; includes asphalt resurfacing, pavement repairs, guardrail and pavement marking 105587~|~1~|~1~|~01/NHS~|~Bridge Concrete Overlay. 93974~|~1~|~2~|~02/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 554 2.45. 100% state. 93974~|~1~|~3~|~03/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 554 3.57. 100% state. 93974~|~1~|~1~|~01/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 218 13.37. 100% funded. 93974~|~1~|~7~|~07/STR~|~Purchase order contract for jack and bore culvert replacement. HOC 664 2.04. 100% state funded. 93974~|~1~|~5~|~05/STR~|~Purchase order contract for jack and bore culvert replacement. HOC 374 0.40. 100% funded. 93974~|~1~|~6~|~06/STR~|~Purchase order contract for jack and bore culvert replacement. HOC 374 0.79. 100% funded. 93974~|~1~|~4~|~04/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 554 4.23. 100% state. 114588~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 681 5.51. Work includes drilled shaft wall. 114798~|~1~|~2~|~02/STR~|~Rural plan split. 114798~|~1~|~1~|~01/S5K~|~STP<5-49 Plan Split 114798~|~1~|~3~|~03/S>2~|~STP>200,000 Plan Split 114831~|~1~|~1~|~01/SAF~|~Intersection improvements. 113588~|~1~|~1~|~01/NFP~|~Construct a westbound and eastbound turn lane on US20A halfway between SR109 & CR10 to accommodate a new employee entrance. Improve the intersection of CR10 and US20A to accommodate a new truck entrance off of CR10. Major full depth pavement improvements on sections of CR10 starting at the new truck entrance and heading south approximately 2,000' 101912~|~1~|~1~|~01/NFA~|~The City is constructing a new road extension named Innovation Campus that will be approximately 4830 feet long from Harrison Road to Mink Road and constructing a road west of Beech Road extending Innovation Way to the west 800 feet. 105553~|~1~|~4~|~04/NHS~|~D3 - Lighting pole replacement 105553~|~1~|~5~|~05/S50~|~D3 - Lighting poles replacement 105553~|~1~|~6~|~06/STR~|~D3 - Lighting pole replacement 105553~|~1~|~2~|~02/NHS~|~D2 - Lighting pole replacement 105553~|~1~|~3~|~03/STR~|~D2 - Lighting pole replacement 105553~|~1~|~1~|~01/SAF~|~D2 / D3 Electrical upgrades 115387~|~1~|~1~|~01/NHS~|~Converting a weigh station into truck parking. 93746~|~1~|~1~|~01/ENH~|~test 96859~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various county roads within Huron County. 116764~|~1~|~1~|~01/NHS~|~Resurfacing. 116764~|~1~|~2~|~02/S>2~|~Resurfacing. 116764~|~1~|~3~|~03/STR~|~Resurfacing. 96555~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span. 96555~|~1~|~5~|~05/STR~|~Minor bridge work 10' to 20' span. 96555~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span. 96555~|~1~|~1~|~01/STR~|~Resurfacing. 96555~|~1~|~2~|~02/S>2~|~Resurfacing, utilizing major rehab funds. 110412~|~1~|~1~|~01/SAE~|~Safety Funding - 4HJ7 (Federal 90%) / 4BC7 (State 10%) - No CAP - Upgrade of intersection at SR 37 and SR 256 to include turn lanes. 110412~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment 124312~|~1~|~1~|~01/ENH~|~Construction of pedestrian facilities utilizing Federal TAP and Safety funding up to the CAP. 113415~|~1~|~1~|~01/NHS~|~Concrete pavement replacement on US 250 near McCauley Drive. 96004~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge rehabilitation on 1600818 COS-SR 60-7.62 Intersect: Little Wakatomika Creek; Not BR Eligible: Length=73 SD/FO(0) SR=87.5 DSR=8 107313~|~1~|~1~|~01/NFA~|~LAW 217 10.70-13.56 107313~|~1~|~2~|~02/STR~|~LAW 243 7.22-11.59 93540~|~1~|~1~|~01/SAF~|~remove slip right lane, add turn lane, redo signal as box span on northbound exit ramp to Galbraith Road. 98254~|~1~|~1~|~01/STR~|~Preventive Maintenance - Crack Seal 117180~|~1~|~1~|~01/MPO/STCE~|~Resurfacing. 87156~|~1~|~1~|~01/NHS~|~Replace bridge CLI-68-2003 (sfn 1401262) (20' concrete arch) over Dutch Creek. 98658~|~1~|~1~|~01/IMS~|~Plan split for all work 121449~|~1~|~1~|~01/SAF~|~Sidewalk Improvement 97869~|~1~|~1~|~01/IMS~|~Type A emergency repair of the retaining wall 108664~|~1~|~1~|~01/STR~|~Culvert and roadway washout repair. DSR HOC-002. 100% Federal ER funds. HOC 93 17.82-17.86. 117944~|~1~|~1~|~01/NFP~|~Systematic sign upgrades/replacements on various routes throughout District 4. 97320~|~1~|~1~|~01/NHS~|~Plans Split for Rockfall/Bench Cleaning 94322~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV/ - 94322~|~1~|~2~|~02/STR~|~Plan Split 02/STR/PV/ - 77613~|~1~|~1~|~01/S>2~|~TRAC funding for all the bridge work. 77613~|~1~|~2~|~02/ENH~|~Enhancement funds for the non-bridge portion of the improvement 97970~|~1~|~1~|~01/NFP~|~Concrete pavement repairs for the project funded at 100 state 115979~|~1~|~1~|~01/STR~|~Profile improvements on CR 18 in Logan county 102124~|~1~|~1~|~01/STR~|~Pavement repairs and resurfacing from SLM 4.99 to 5.31 102124~|~1~|~2~|~02/STR~|~Upgrade guardrail, construct roadside ditches, replace culverts and construct retaining walls to alleviate riverbank erosion at various locations from south of Hyatts Rd (SLM 4.99) to Bunty Station Rd (SLM 8.38) 102124~|~1~|~3~|~03/S>2~|~Upgrade guardrail, construct roadside ditches and replace culvert at various locations from Bunty Station Rd (SLM 8.38) to SLM 8.53 89034~|~1~|~2~|~02/ERD~|~Plan split for Franklin Ave enhancement work. 89034~|~1~|~1~|~01/CMQ~|~Plan Split for shared use path work along the Irish Bend hillside between Detroit Ave and Columbus Rd. 106205~|~1~|~1~|~01/NFP~|~Lighting improvements to the MAH IR 680/Indianola interchange (base bid) and MAH IR 680/Shirley Rd (Alt Add). 100669~|~1~|~1~|~01/STR~|~Chip sealing COL-164 and COL-170. 106113~|~1~|~1~|~01/NFP~|~Landscaping 104882~|~1~|~1~|~01/NFP~|~D09 FY23 RPM. 112421~|~1~|~1~|~01/IMS~|~Fine poly AC overlay on: MOT-75 SLM 0.00 to 3.92 MOT-675 SLM 0.00 to 4.00 98022~|~1~|~3~|~03/S5K/LANC~|~Resurfacing and related roadway work within city of Lancaster. 98022~|~1~|~4~|~04/S5K/LANC~|~Reconstruction of drainage infrastructure throughout project area. 98022~|~1~|~2~|~02/S5K~|~Resurfacing and related roadway work inside of urbanized boundary. 98022~|~1~|~1~|~01/STR~|~Resurfacing and related roadway work outside of corporation limits for City of Lancaster and urbanized boundary. 97739~|~1~|~1~|~01/NHS~|~SFN 4600185, LOG-33-0397 on Slough Ditch - replace deficinet structure with new structure. Investigate us of precast structure. 111496~|~1~|~1~|~01/NFP~|~All work is in this plan split. 94379~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7. 111087~|~1~|~1~|~01/SAF~|~Demolition of 2 houses and tree cutting 122895~|~1~|~1~|~01/BRF/MILL~|~Bridge preventive maintenance, work TBD. 116948~|~1~|~1~|~01/SAF~|~MRG CR Guardrail FY 2025 95486~|~1~|~1~|~01/MPO~|~Tentative split for FRA County resurfacing 88574~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete on AUG SR 66 from SLM 3.41 to 4.58, segment length 1.17 mile, total lane miles 2.74. 106641~|~1~|~1~|~01/S<2~|~Correct the lack of adequate pedestrian crossings along the project route, and signalization at the intersection of SR 118 and Vine Street. Also correct the lack of street lighting. Add audible warnings at SR 118 and SR 219. 111175~|~1~|~1~|~01/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Backwall replacement on SFN 4500873 93885~|~1~|~1~|~01/NFA~|~Bridge replacement project. HOC 374 21.98, SFN 3704114. Not on any federal aid system. Funded 100% state. 93885~|~1~|~2~|~02/STR~|~Pave invert of HOC 93 19.75, SFN 3702499. Rural other federal aid funded 80 federal/20 state. 93017~|~1~|~2~|~02/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - Guardrail Replacement at Gue-IR 77 & SR 541 Ramps 93017~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - Resurfacing with related work on Gue-IR 77-17.70 to 23.44 and Gue-541-8.32 to 8.66 93017~|~2~|~4~|~04/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - Replace deck, backwalls approach slab, paint, and bearings on 1) Gue-IR 77- 20.67L SFN# 3003450 L=115; SD/FO=(0); SR = 89.1; DSR = 6 - Not BR Eligible for repair; 2) Gue-IR 77- 20.67R SFN# 3003485 L=115; SD/FO=(0); SR = 89.1; DSR = 6 - Not BR Eligible for repair; 3) Bridge painting on Gue-IR 77- 16.76 SFN# 3003361 L=240; SD/FO=(2); SR = 67.9; DSR = 6 - BR Eligible for repair; 93017~|~1~|~3~|~03/NFP~|~District Lands & Building Maintenance LBM7 (100% State) - Plan Split for resurfacing the North Salem Outpost 87671~|~1~|~1~|~01/STR~|~slide repair at WOO SR64 11.54-11.55 100423~|~1~|~1~|~01/STR~|~HIG 73 (15.34-23.48) 101891~|~1~|~1~|~01/SAE~|~Add plan split. 103507~|~1~|~1~|~01/NHS~|~plan split for Urban paving funds covering the top 3" of paving from on Luc - 25 from 05.250 to 06.980. 103507~|~1~|~2~|~02/NFA~|~100 City plan split will cover all other work not included under the Urban paving policy. 115875~|~1~|~1~|~01/BRO~|~Split for eligible bridge work 22077~|~1~|~1~|~01/BRO~|~Plan Split for SFN 7747195 Summit Road Bridge over Wolf Creek 95780~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 4.339 95780~|~1~|~2~|~02/S<2~|~from SLM 4.339 to SLM 7.085 95780~|~1~|~3~|~03/BRO~|~Bridge asphalt overlay 121525~|~1~|~1~|~01/SAF~|~Polyester Pavement Markers 114993~|~1~|~1~|~01/NFP~|~Created for J&C involvement 105155~|~1~|~1~|~01/IMS~|~Plan split for sign repair on the interstate system 117246~|~1~|~1~|~01/SAF~|~All safety work associated with moving the ditch, extending culvert, replacing guardrail, etc. 88516~|~1~|~3~|~03/BRO~|~Bridge on FUL-64 @ SLM 0.48 88516~|~1~|~1~|~01/STR~|~District Allocation (Rural) FUL US20A from SLM 23.94 to SLM 24.86 Rural 88516~|~1~|~2~|~02/S>2~|~District Allocation (Urban)FUL-20A from 24.86 to 26.04 and FUL-64 from 0.25 to 1.71 88516~|~2~|~4~|~04/SAF~|~Safety funding: FUL-20A-26.04 to 26.27 and LUC-20A-0.00 to 0.18 Urban 87299~|~1~|~1~|~01/STR~|~general system resurfacing; includes pavement repairs and pavement marking 93875~|~1~|~1~|~01/SAF~|~Signal replacements at three locations in Trumbull County, Ohio. Located at TRU-SR5-1.61, TRU-US62-4.85, TRU-SR305-10.73. 94045~|~1~|~1~|~01/IMS~|~Maintenance contract for sign structure repairs. 108867~|~1~|~1~|~01/SAF~|~Install high friction surface treatment on BUT SR-122 and various ramps at GRE-35/675 interchange 90704~|~1~|~1~|~01/MPO~|~widen old LUC US 24 9.63-10.76 - widen to 3 lanes old US-24 from South St to Waterville-Monclova Rd in the Village of Waterville 91815~|~1~|~1~|~01/NHS~|~Interchange highway lighting upgrade at COL-7-0.59 (Clark Avenue), COL-7-1.27 (SR 39 Aten Street), and COL-7-2.75 (SR 45) using district's system preservation funds 122353~|~1~|~1~|~01/CMQ~|~Citywide traffic signal upgrade at 5 locations using CMAQ funding. 122353~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost. 124942~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on the interstate system with district preservation funding. 120683~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation 101523~|~1~|~2~|~02/SAF~|~100% 4PS7 for New Signals at ASD-42-5.44 and MED-57-2.53 101523~|~1~|~3~|~03/SAF~|~100% City of Ashland for Signal Preemption on ASD-250 101523~|~1~|~1~|~01/SAF~|~Priority 1: 100% Safety Funding for Battery Backups and Traffic Signal Upgrades on ASD-250 at Sugarbush and George Rd. Capped at $33,653.Priority 2: 100% 4PS7 for Traffic Signals Upgrades on ASD-250 at Sugarbush and George Rd. 123716~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with / without repairs on various priority system pavements in District 3 112952~|~1~|~1~|~01/S<2~|~Marysville Urban Area Plan Split: UNI-36-13.17-13.86 118713~|~1~|~1~|~01/S>2~|~Superstructure replacement. 124397~|~1~|~1~|~01/NFA~|~Added split to rebuild portion of the Ohio to Erie Trail in the City of Westerville. 121654~|~1~|~1~|~01/NHS~|~Construction of Roundabout at T intersection of US 250 with SR 21 119229~|~1~|~1~|~01/STR~|~Rural plan split. 120444~|~1~|~1~|~01/STR~|~Established Plan Split - 01/STR/PV/ 80% Federal (4PF7)/20% State (4PS7) 94109~|~1~|~2~|~02/STR~|~Bridge Maintenance SFN 7807872 TRU SR 609 1.90 over Pymatuning Creek. 94109~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 609 from 0.00 to 2.56. 108029~|~1~|~1~|~01/NHS~|~Signage 108029~|~1~|~2~|~02/S5K~|~Speed Limit feedback signs in Milan. 108029~|~3~|~3~|~03/S5K~|~Signage in Milan 101092~|~1~|~1~|~01/S>2~|~Concrete pavement repairs 120546~|~1~|~1~|~01/SAF/HCEO~|~Plan split for CEAO HSIP funded portion of construction. 121797~|~1~|~1~|~01/SAF~|~Safety improvements. 93964~|~1~|~1~|~01/IMS~|~Conversion of th eIR-71 and Western Row interchange to a full interchange including constructon of new ramps and auxilary lanes. 93964~|~1~|~2~|~02/IMS~|~This plan split includes sealing of the deck, installation of polymer joints, installation of abutment supports, replacement of the NB parapets and interior SB parapet, and sealing of existing surfaces with epoxy urethane sealer for bridges WAR-71-0361 L&R (8301840/8301875). 91851~|~3~|~3~|~03/STR~|~"03/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6401112 PER SR37 18.09 Intersect: Trib Of Black Fk Moxha Cr; Not BR Eligible for Replacement: Length=14 SD/FO(2) SR=44.1 DSR=5; 91851~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6400426 PER SR13 15.35 Intersect: Tributary Of Bear Creek; Not BR Eligible for Replacement: Length=16 SD/FO(1) SR=16.8 DSR=4; 91851~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6400396 PER SR13 14.54 Intersect: Tributary Of Bear Creek; Not BR Eligible for Replacement: Length=16 SD/FO(1) SR=17.7 DSR=4; 2) 6400426 PER SR13 15.35 Intersect: Tributary Of Bear Creek; Not BR Eligible for Replacement: Length=16 SD/FO(1) SR=16.8 DSR=4; 3) 6401112 PER SR37 18.09 Intersect: Trib Of Black Fk Moxha Cr; Not BR Eligible for Replacement: Length=14 SD/FO(2) SR=44.1 DSR=5; 108396~|~1~|~1~|~01/NHS~|~BEL-7-11.00, DSR# BEL-022 108396~|~1~|~2~|~02/NHS~|~BEL-7-14.00, DSR# BEL-025 108396~|~1~|~3~|~03/NHS~|~BEL-7-24.30, DSR# BEL-019 106689~|~1~|~1~|~01/NFA~|~Construction to excavate the unsuitable soils to a stable depth, fill with dump rock, establish proper drainage and restore the roadway. 95553~|~1~|~1~|~01/ENH~|~MORPC/Columbus funding for sidewalks along COTA bus routes 111598~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes. 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder. 112931~|~1~|~1~|~01/S>2~|~DEL-3 from 1.38 to 8.74 109020~|~1~|~2~|~02/NFA~|~Project Construction cost is over the federal max. So Construction Engineering funding will be 100% Local 109020~|~1~|~1~|~01/NFP~|~80%/20% Tap fund with 15% of local share coming from TRC funds up to the new federal max of $1,262,295. 99433~|~1~|~1~|~01/NFP~|~Crack seal of various routes throughout District 4. 114622~|~1~|~1~|~01/S<2~|~Overlay in PIK 220. 114622~|~1~|~2~|~02/STR~|~Overlay on PIK 220 114622~|~1~|~3~|~03/STR~|~Bridge PM 96871~|~1~|~1~|~01/NFA~|~Installation of traffic signal near Barberton elementary, in the City of Barberton, Summit County, Ohio. 88520~|~1~|~1~|~01/S>2~|~Milling of the existing roadway and resurfacing with asphalt concrete on MOT-SR-741 SLM 6.20 to 7.16 and 8.34 to 9.54 88520~|~1~|~2~|~02/BRO~|~SFN 5710510, MOT-741-0841 over Conrail RR, GM Access Road1. Remove exisiting latex modified concrete overlay using hydrodemolition and replace with SDC overlay. 2. Replace torn seals in expansion joints. 3. Reset 6 rockers out of adjustment on rear abutment. 4. Seal concrete surfaces.SFN 510472 Remove and replace wearing surface and waterproofing 82463~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on SLM 8.68 to 9.77 (segment length 1.09 Total Lane Miles 2.18). Urban Paving Program. 82463~|~1~|~2~|~02/S<2~|~Pavement planing and resurfacing with asphalt concrete on LOG US 68 SLM 9.77 to 10.09 (segment Length 0.320 Total Lane Miles 0.640). 107639~|~1~|~1~|~01/NFA~|~Replace ADA 770 10.27 (0104558) 98543~|~1~|~1~|~01/SAF~|~District Wide contract to replace roadside delineators in FY2020 112988~|~1~|~1~|~01/IMS~|~Rehabilitate the HAM-71--5512 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other minor repairs. 104740~|~1~|~1~|~01/SAF~|~Installing two traffic signals along East Market St (SR 82 off-Ramp & Warren Sharron Rd), allowing left-turns off of the SR 82 EB off-ramp to East Market St, reconfiguring EB East Market St to consist of a left-turn-only lane and a signal by-pass lane, and realigning WB Warren Sharon Rd. CR 329 from 3.27 to 3.43. 79353~|~1~|~1~|~01/BRO~|~New bridge Construction on future SR 702, across Ohio River 79353~|~1~|~2~|~02/BRO~|~For reimbursement to WVDOT for Construction Engineering Services provided by them for Construction of new bridge across River Ohio on future SR 702 93889~|~1~|~1~|~01/SAF~|~Replacement of signal on State Route 305 at North Park Avenue in Champion Township, Trumbull County, Ohio. 91964~|~1~|~3~|~03/STR~|~Resurfacing on SR 45 from SLM 18.99 to 19.63 91964~|~1~|~2~|~02/S<2~|~Resurfacing on SR 45 from SLM 16.92 to 18.99. 91964~|~1~|~1~|~01/NHS~|~Resrufacing on SR 45 from SLM 29.34 to 29.61, SR 14 and US 62 in the NHS area. 103835~|~1~|~1~|~01/S<2~|~Improvement of downtown streets with crosswalks, signals, signage. 114936~|~1~|~1~|~01/STR~|~Bridge Replacement. 83024~|~2~|~2~|~02/BRF~|~"02/BRF/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6006574 MUS SR666 5.71 Intersect: Over Blount Run; BR Eligible for Replacement; Length=31 SD/FO(1) SR=49.7 DSR=3 83024~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6006450 MUS SR666 2.66 Intersect: Sr666 Over Ditch; Not BR Eligible for replacement: Length=21 SD/FO(1) SR 52.8 DSR=5 112429~|~1~|~1~|~01/S<2~|~01/S<2/PV/ - Plan Split 1 112429~|~1~|~2~|~02/STR~|~02/STR/PV/ - Plan SPlit 2 83958~|~1~|~1~|~01/BRO~|~SFN 6503330; PIC SR 674-4.210 - BRIDGE OVER TURKEY RUN 75322~|~1~|~1~|~01/NFA~|~New bridge over RR in Fostoria 113674~|~1~|~1~|~01/NHS~|~Split for bridge work on SR-8 and SR-10 116184~|~1~|~1~|~01/STR~|~Bridge replacement. 109685~|~1~|~1~|~01/STR~|~Resurfacing HOL-241 115007~|~1~|~1~|~01/MPO/BEAV~|~Reconstruction of North Fairfield Road from Crossing Blvd. to I-675 ramps. Reconstruction of I-675 EB off ramp with widening to increase storage capacity. 92626~|~1~|~1~|~01/NHS~|~AC Overlay with repairs 122811~|~1~|~1~|~01/MPO~|~Anderson Township EV Charging 117767~|~1~|~1~|~01/SAF~|~Roadside/Median Improvement (Safety) 122027~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 120449~|~1~|~1~|~01/SAF~|~Roundabout at the Interstate 670 off-ramp at Johnstown Road and East 17th Avenue 88229~|~1~|~1~|~01/CMQ~|~Convert operation of the signals from pretimed to actuated, coordinate signal operations, and install preemption system at the intersections of College/Covington, College/Water, and College/High streets. 107927~|~1~|~2~|~02/STR~|~Rehab or replace culverts on rural route: CLE-756 107927~|~1~|~1~|~01/NHS~|~Replace or rehab NHS culverts: CLE-52 107927~|~1~|~3~|~03/NFA~|~rehab culverts along SR743 123200~|~1~|~1~|~01/IMS~|~Heat straighten and repair bridge due to unknown bridge strike in 2024 123200~|~1~|~2~|~02/NHS~|~CLA-68-6.64 - Heat straighten and repair bridge due to unknown bridge strike in 2023. 123200~|~1~|~3~|~03/NHS~|~CLA-68-7.41-R. Heat straighten and repair bridge due to a bridge strike on 6/14/2023. Completed accident report number is 12-0544-12. 123200~|~1~|~4~|~04/NHS~|~MOT-35-13.44. Repair bridge due to a bridge strike on 2/21/2024. Completed accident report number is 2402210018. 83280~|~1~|~1~|~01/CMQ~|~LAW CR144 2.94 Charley Creek It is proposed to realign the intersection of CR144 & CR1 and also build an access road south of US52 to access development. 80% KYOVA/20 Local Match01/CMAQ/PV/Law 83280~|~1~|~2~|~02/MPO~|~LAW CR144 2.94 Charley Creek It is proposed to realign the intersection of CR144 & CR1 and also build an access road south of US52 to access development. STP Funds 80% KYOVA/20 Local Match01/MPO/PV/LAW 123159~|~1~|~1~|~01/IMS~|~Resurfacing with fine graded polymer modified asphalt concrete 119381~|~1~|~1~|~01/IMS~|~Lining culverts. 119381~|~1~|~2~|~02/NHS~|~Lining culvert. 119381~|~1~|~4~|~04/STR~|~Culvert other and culvert lining. 119381~|~1~|~3~|~03/S>2~|~Bridge preventive maintenance. 114680~|~1~|~1~|~01/S5K~|~Reconstruct slope due to erosion along ATB SR 531. 115512~|~1~|~1~|~01/SAF~|~Safety funded items up to program max 92874~|~1~|~2~|~02/S>2~|~100% local participation 92874~|~1~|~1~|~01/S>2~|~80/20 federal/state participation to repair slide. 117271~|~1~|~1~|~01/MPO~|~Sidewalk work 100844~|~1~|~1~|~01/S<2~|~Slide repairs 110753~|~1~|~1~|~01/BRF~|~Bridge replacement 80% federal 4B87 and 20% local LNTP. 101065~|~1~|~1~|~01/SAF~|~Install rumble stripes along the edge lines of the center two-way left turning lane on PIK 23 13.26. 101204~|~1~|~1~|~01/NHS~|~CO CO Contr 01 pavement plan split 1 for the following NHS routes: DEL-36-23.30-29.08 DEL-37-0.00-7.26 UNI-33-12.59-24.55 101204~|~2~|~2~|~02/STR~|~CO CO Contr 02 plan split 2 created for the following STP rural routes: MRW-229-5.30-12.42 UNI-42-0.00-4.84 101204~|~1~|~3~|~03/NHS~|~CO CO Engr 01 plan split 1 created for the following NHS routes: DEL-37-23.30-29.08 DEL-36-0.00-7.26 UNI-33-12.59-24.55 101204~|~2~|~4~|~04/STR~|~CO CO Engr 02 plan split 2 for the following STP rural routes: MRW-229-5.30-12.42 UNI-42-0.00-4.84 111101~|~1~|~1~|~01/NHS~|~Plans split 1 for Bridge SFN 3500365 109486~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M. 97229~|~1~|~1~|~01/STR~|~BRO SR 505 6.83 109576~|~1~|~1~|~01/STR~|~Culvert Replacement 114546~|~1~|~1~|~01/NFP~|~Crack Sealing funding 83340~|~1~|~1~|~01/BRF~|~CEAO Bridge replacementCR84-0.260/Bates Rd over Little Darby Creek, SFN 8032203Local Sponsor - UNI County Engineer 119635~|~1~|~1~|~01/NFP~|~Laboratory testing in District Six. 105346~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 5: Remove Duke Energy's 15kv distribution lines from under the north utility trough and relocate to the south side of the viaduct if they cannot be removed entirely. Relocate the 36 inch water main and Level 3 fiber optic cables out of the north trough. Remove the north utility trough. 120672~|~1~|~1~|~01/MPO~|~Funding split for Carbon Reduction Program funding 124128~|~1~|~1~|~01/IMS~|~Widen from 4 to 6 lanes 110259~|~1~|~1~|~01/NHS~|~Lytle Tunnel Repair work. 95634~|~1~|~1~|~01/NFA/SCI~|~It is proposed to replace/rebuild guardrail at various locations on the local county roads in Scioto County.100% safety funds provided by CEAO. 109562~|~1~|~1~|~01/SAF~|~This project is the district's long line maintenance contract to maintain the centerline, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district. 107722~|~1~|~1~|~01/STR~|~Slide RepairADA 41 22.50 117384~|~1~|~1~|~01/MPO/CORT~|~Resurfacing. 87900~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP's - Guardrail Upgrade - Lic-SR 37-25.15-25.20 87900~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail upgrade: 1) Lic-SR 13-17.51 to 23.34; 2) Kno-SR 13-00.00 to 23.09; 3) Lic-SR 16-14.41 to 30.84; 4) Lic-SR 79-05.55 to 13.74 87900~|~1~|~2~|~02/SAE~|~"02/SAE/PV/ " - Safety 100% 4HJ7 - Capped at $400,000.00 Contract, $40,000.00 CENG - Guardrail end treatments replacement: 1) Lic-SR 13-17.51 to 23.34; 2) Kno-SR 13-00.00 to 23.09; 3) Lic-SR 16-14.41 to 30.84; 4) Lic-SR 79-05.55 to 13.74 95686~|~1~|~1~|~01/S>2~|~Bancroft St from Secor to Parkside 114120~|~1~|~1~|~01/STR~|~milling and resurfacing on Bellville-Johnsville (CR31) 114120~|~1~|~2~|~02/S<2~|~Milling & Paving Lexington-Ontario Rd (CR144) STP 5000 to 200,000 114120~|~1~|~3~|~03/STR~|~Milling & Paving Lexington-Ontario Rd (CR144) STP Rural (<5000) 108931~|~1~|~1~|~01/BRF~|~SFN 8533903 118760~|~1~|~1~|~01/NHS~|~added plan split. 105717~|~1~|~1~|~01/MPO~|~work eligible for federal-aid 105717~|~1~|~2~|~02/NFP~|~Plan split for 100% local items 109644~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SLM 29.30 to 33.58 109644~|~1~|~2~|~02/S<2~|~Resurfacing SR 147 from SLM 33.58 to 34.90 101718~|~1~|~2~|~02/NHS/JOHN~|~Plan Split for resurfacing inside City of Johnstown, 80% 4PF7/20% 4BG7 101718~|~1~|~1~|~01/SAF/JOHN~|~Intersection improvements at SR 37 and Leafy Dell Road in city of Johnstown. 101718~|~1~|~3~|~03/NHS/JOHN~|~Plan Split for resurfacing 100% City of Johnstown. 115687~|~1~|~1~|~01/NFP~|~Created for J&C involvement. 106407~|~1~|~1~|~01/SAF~|~Install multi-lane roundabout at Wayne Madison and Hamilton Trenton Rd with pedestrian accommodations 116046~|~1~|~1~|~01/NHS~|~Plan split for the slide repairs on HAM-52 25874~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on GUE SR265 0-4.59 25874~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation Pavement Marking - 4MP7 (100% State) - No CAP - Pavement Marking on Gue-IR 70-17.50-22.80 115176~|~1~|~1~|~01/BRF~|~Removal and replacement of the bridge carrying the Great Miami Recreation Trail over Sycamore Creek in Miamisburg. 119990~|~1~|~1~|~01/S>2~|~convert a two way stop controlled intersection to a single lane roundabout at Wilmington Dayton Road and Centerville Road 108970~|~1~|~1~|~01/IMS~|~Emergency catch basin repair 92146~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 2 years mowing contract 108470~|~1~|~1~|~01/SAF/LANC~|~City of Lancaster Safety Program Funding - 4HJ7 (90% Federal) / 4BG7 (10% Local) - See CAP Comments - Improvement to Ety Road 108470~|~1~|~2~|~02/S<2/LANC~|~City of Lancaster Local Funding - 4BG7 (100% Local) - No CAP - Traffic Signal at Columbus Street and Ety Road 108470~|~1~|~3~|~03/SAF/LANC~|~City of Lancaster Safety Program Funding - 4HJ7 (90% Federal) / 4BG7 (10% Local) - See CAP Comments - Sidewalks along Columbus Street - Additive Alternate 106248~|~1~|~1~|~01/NFA~|~The City will reconstruct Campbell Rd between Production Dr. and Featherwood Dr approx. 1600 linear feet to raise it three or more feet above flood conditions, improve the truck turning radius at Industrial Dr interaction, and related improvements. 116452~|~1~|~1~|~01/S<2~|~Overlay in Ross County. 116553~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. 111025~|~1~|~1~|~01/BRF~|~Local bridge replacement 106923~|~1~|~1~|~01/NFP~|~ODNR funded project at Monroe Lake - paving, gravel and culvert work. Funded 100% state ODNR. 109648~|~1~|~1~|~01/STR~|~Resurfacing HAS-800 95567~|~1~|~1~|~01/IMS~|~Demolition of remaining stearns and foster buildings bounded by I75,Wyoming Avenue, Shepherd Lane and Brown Street. 100930~|~1~|~1~|~01/NHS~|~This plan split is for NHS routes. 100930~|~1~|~2~|~02/STR~|~This plan split is for rural routes. 109727~|~1~|~1~|~01/STR~|~AC Overlay without repairs 91582~|~1~|~1~|~01/STR~|~Brdg replacement. 2.11 miles East of Adams County Line. 7303297 SCI SR125 2.11 Intersect: Rocky Fork80 Fed/20 State. 01/STR/BR/State 93018~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 33-12.79 to 17.39 93018~|~2~|~2~|~02/NHS~|~"02/NHS/BR/ " - plan split 02 for FAI-33-12.79 93018~|~1~|~3~|~03/NHS~|~Established "CENG 02" for $2927.10 for FAI-33-12.79 using Group A project greater than $1M use 3% 112757~|~1~|~1~|~01/MPO~|~Resurfacing of Riddle St from Meridian St to Liberty St in the City of Ravenna. 105317~|~1~|~1~|~01/IMS~|~Plan split for deck replacement and structural steel painting 114986~|~1~|~1~|~01/STR~|~D3 Pruning 96323~|~1~|~2~|~02/STR~|~Rehabilitation of culvert - SFN 6401422, PER SR 93 7.656 96323~|~1~|~1~|~01/STR~|~Rehabilitation of three structures - SFNs 6401295, 6401325, and 6401392 102796~|~1~|~1~|~01/ENH~|~Construct Hike and Bike Trail. 114420~|~1~|~1~|~01/S<2/HAS~|~Pavement rehabilitation and drainage improvements project funded at a maximum of $500,000, using 100% (4SH7) Local Roads Oil and Gas Shale Program. 99738~|~1~|~1~|~01/CMQ~|~Plan split covers CMAQ funded construction contract for signalization and interconnect at 11 intersections within Grandview Heights 99738~|~1~|~2~|~02/CMQ~|~Costs associated with non-eligible items (due to unwarranted signals). 107820~|~1~|~1~|~01/NFP~|~Improvements at the Ohio Expo Center 117536~|~1~|~1~|~01/ENH~|~Preserve & rehab Ohio & Erie Canal Locks 48, 50, and 55 in Scioto County. 89473~|~1~|~1~|~01/BRF~|~?01/BRF/BR/TUS? - Replace bridge over Big Stillwater Creek, 0.3 mile N of CR 28. Project will include approximately 100' of roadway realignment. 116214~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into roundabout 88693~|~1~|~1~|~01/STR~|~Proposed work consists of resurfacing of the existing roadway with asphalt concrete in Shelby County on SR 29 (0.00) SHE/AUG CL to SLM 3.82 (JCT 29/274). SR 274 0.00 (SHE/AUG CL) to SLM 1.14 (JCT 29/274). 113230~|~1~|~1~|~01/NHS~|~Roadway milling and resurfacing including pavement markings and manhole adjustments. 112590~|~1~|~1~|~01/NFP~|~All work at the EXPO Center 108141~|~1~|~1~|~01/MPO~|~Resurfacing of Valley View Rd from SR 8 to Old Eight Rd. 108141~|~1~|~2~|~02/CMQ/SUCE~|~Intersection improvement at Olde Eight Rd and Valley View Rd. 102948~|~1~|~1~|~01/STR~|~STP Rural eligible. 120825~|~1~|~1~|~01/CMQ~|~Plan Split for CMAQ eligible scope. 109711~|~1~|~1~|~01/STR~|~AC Overlay without repairs 91024~|~1~|~1~|~01/SAE~|~PAVEMENT MARKINGS 90691~|~1~|~1~|~01/MPO~|~A TMACOG enhancement funded project to build bike path at LUC SR65 5.22-5.33 114459~|~1~|~1~|~01/STR~|~Resurfacing US 62 104792~|~1~|~1~|~01/S<2/HEAT~|~City of Heath LCATS STP Funding - 4TA7 (Federal 80%) / 4BG7 (Local 20%) - See CAP Comment - Resurfacing with related work on Thornwood Drive from Lees Road to South of the Hallie Ln/Central Parkway W intersection 95398~|~1~|~1~|~01/BRO~|~The substructure work will increase the vertical clearance, the existing beams will be set back on new bearings, with a new bridge deck. 90948~|~1~|~1~|~01/SAF~|~This Plan Split is for work eligible for use of the funds from the ODOT Central Office controlled safety program. The safety program cap is $1,200,000 for construction 102537~|~1~|~1~|~01/BRO~|~Replace deck with new deck for bridge TUS-258-0042 (SFN 7905491). Approach slabs to be replaced. 95442~|~1~|~1~|~01/STR~|~ROS SR180 Resurfacing Project0.00 - 11.67On ROS SR180, beginning at its intersection w/SR159, and terminating at the corp limit of the Village of Adelphi, it is proposed to perform repairs and resurface the highway. All bridges are pave thru except SNF 7104650 SLM 3.5080/20 split 95442~|~1~|~2~|~02/STR~|~7104650 ROSS SR180 3.500 Rehab 99455~|~1~|~1~|~01/NFA~|~Landslide repair by excavation and replacement of slope. 105552~|~1~|~2~|~02/S<2~|~Asheville-S. Bloomfield urban area plan split PIC-104-15.68-16.62 105552~|~1~|~3~|~03/S>2~|~Columbus urban area plan split: PIC-104-20.70-21.47 105552~|~1~|~1~|~01/STR~|~Rural plan split: PIC-104-15.35-15.68; PIC-104-16.62-20.70; PIC-22-14.32-15.74; PIC-22-21.04-23.96 105552~|~1~|~4~|~04/S<2~|~Circleville urban area plan split: PIC-22-15.74 to 15.98 and PIC-22- 18.88 to 21.04 114445~|~1~|~1~|~01/NFA~|~Resurfacing SR 520 from SLM 0.00 to SLM 12.51 114445~|~1~|~2~|~02/STR~|~Resurfacing SR 520 from SLM 12.51 to SLM 13.47 111355~|~1~|~1~|~01/NFP~|~ODNR project for facility resurfacing at the Forked Run State Park. Funded 100% State. 91941~|~1~|~2~|~02/S<2~|~LAW 7 3.62-6.36PIK 104 10.40-12.01 91941~|~1~|~3~|~03/NFA~|~LAW 650 7.88-7.99SCI CR7 91941~|~1~|~1~|~01/STR~|~JAC 233 0.68-3.23JAC 327 11.84-20.50LAW 93 9.37-10.60LAW 522 6.98-7.47LAW 650 2.61-3.11/3.81-4.11LAW 775 7.14-7.38PIK 104 8.45-10.40SCI 125 1.71-6.27SCI 335 11.72-11.73SCI 522 2.90-3.00 102898~|~1~|~1~|~01/NHS~|~Resurface US 20 from 19.32 to 24.43. 102898~|~1~|~2~|~02/NHS~|~SAN-29-22.53 Culvert replacement 117059~|~1~|~1~|~01/STR~|~Culver replacement project. MEG 681 11.99 (CFN 1814380) and MEG 681 12.25 (CFN 1814382). 88885~|~1~|~1~|~01/STR~|~Bridge (length <20') work: RIC-545-9.90 (SFN 7006675) 113615~|~1~|~1~|~01/NFP~|~Improve the intersection of Graham and Castalia by increasing the radii of the intersection, widen Graham to include a right turn lane and minor drainage improvements. 109221~|~1~|~1~|~01/NFA~|~2018 Operations Chip Seals 123075~|~1~|~1~|~01/ENH~|~reconstruction of Maple Street in City of Eaton 92526~|~1~|~1~|~01/S>2~|~Plan Split for Traffic Signal on SR 687 at SLM 4.78 93797~|~1~|~1~|~01/SAF~|~SR335 Guardrail & Paved Gutter Safety Project On SR335, 0.05 mile south of Swauger Valley Road to RR overpass. it is proposed to upgrade and relocate guradrail on the east side of SR335 and at the intersection of Swauger Valley Road and install paved gutter on the west side of SR335. PE Phase is 90% Fed/10% State Safety FundsRW Phase is 90% Fed/10% State Safety FundsCO Phase is 100% Fed Safety Funds01/SAF/OTH/State 105664~|~1~|~1~|~01/NHS~|~Work on the NHS. District Preservation Program funds. 98346~|~1~|~1~|~01/NFP~|~80% State / 20% Local participation split for eligible work items 98346~|~1~|~2~|~02/NFP~|~100% Local participation for non-eligible work items. 104793~|~1~|~1~|~01/NFP~|~Landscape maintenance at various locations 98952~|~1~|~1~|~01/NHS~|~Tree cutting and pruning. 100991~|~1~|~1~|~01/NHS~|~Access management of various intersection on central ave in Toledo. 112456~|~1~|~1~|~01/NFP~|~Split for slide repair work 94178~|~1~|~1~|~01/IMS~|~Resurfacingwith minor pavement repair on I-75 to hold over until TRAC projects widen the roadway. Resurface all lanes of I-75 from US 27 to past the I-74 interchange: HAM IR 75: SLM 4.14 to 5.80 116879~|~1~|~1~|~01/S>2~|~Resurfacing 118965~|~1~|~1~|~01/S5K~|~Resurfacing SR 45 and SR 164 in Lisbon 118965~|~1~|~2~|~02/NFA~|~Resurfacing SR 164 from SLM 15.60 to 15.72 94271~|~1~|~7~|~07/IMS/ColU~|~100% Columbus Public Utilities items:new 8" water line at Mound Stmore than 4 electric ducts at 70/18th/Mooberry 94271~|~1~|~4~|~04/IMS~|~IM funding for project eligible utilities - water, sanitary, electric 94271~|~1~|~6~|~06/IMS/ColS~|~100% Columbus Public Service funded items:electric line going underground on Grant Ave, brick crosswalks 94271~|~1~|~9~|~09/IMS/AEP~|~100% items funded by American Electric Power:16 5" conduits at 18th St bridge 94271~|~1~|~3~|~03/IMS~|~IM funding for bridge replacement (not BR eligible for replacement):SFN 2504839, FRA-70-15.25, 18th St 94271~|~1~|~8~|~08/IMS/CHos~|~100% items funded by Chilren's Hospital:8' extra width on 18th St bridge4 4" conduits with pullboxesdrainage & irrigation items on structure 94271~|~1~|~1~|~01/IMS~|~IM funding for pavement, retaining walls, new P2 ramp, Mound St connector, closing ramps, debris removal 94271~|~1~|~2~|~02/IMS~|~IM funding for new bridge constructionSFN 2518929, FRA-70-17.04, on P2 ramp over I-71 and Parsons Ave 94271~|~1~|~5~|~05/MPO~|~MORPC STP & Columbus Public Service funding for items on Mound St: 5' bike lane, trees & grates, sidewalk 119764~|~1~|~1~|~01/ENH/THRN~|~Construction of multi-use pathway 102896~|~1~|~1~|~01/SAE~|~Pavement marking upgrade on various Medina County roads. 113663~|~1~|~1~|~01/SAF~|~Improvements to IR 270 SB off ramp and Easton Way (Station 80+74.30 to Station 64+65.00) 113663~|~1~|~2~|~02/S>2/COC~|~Items of work associated with resurfacing of Easton Way (Stelzer Rd to Station 64+65) 114718~|~1~|~1~|~01/NFP~|~Districtwide guardrail repair and upgrades. 100444~|~1~|~1~|~01/NHS~|~Deck SealingROS 023R 8670 L 7100337ROS 023R 8670 R 7100361ROS 023R 9260 L 7100396ROS 023R 9260 R 7100426ROS 023R 10000 L 7100450ROS 023R 10000 R 7100485ROS 023R 10260 L 7100515ROS 023R 10260 R 7100574ROS 023R 10520 L 7100604ROS 023R 10520 R 7100639ROS 023R 10740 R 7100663ROS 023R 12020 L 7100698ROS 023R 12020 R 7100728ROS 023R 12570 L 7100752ROS 023R 12570 R 7100787ROS 035R 3420 L 7101465ROS 035R 3420 R 7101481ROS 035R 3640 L 7101538ROS 035R 3640 R 7101562 98688~|~1~|~1~|~01/S>2~|~This Plan split covers all roadway work included in the project. RBX/Erie/Brotherton Intersection 100845~|~1~|~1~|~01/S<2~|~Slide repairs 115603~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 121701~|~1~|~1~|~01/NHS~|~Culvert Repair. GAL 7 2.48 (CFN 2700158). 120475~|~1~|~1~|~01/S5K/LANC~|~Replacement of structure carrying E. Sixth Ave over Fetters Run (SFN 2360713). 119972~|~1~|~1~|~01/BRF~|~Plan split for bridge demolition & turn around work. 109672~|~1~|~1~|~01/SAE~|~100% CEAO Safety funded 94433~|~1~|~1~|~01/STR~|~Bridge - Major Rehabilitation 114656~|~1~|~1~|~01/NHS~|~Plan split for the NHS locations on GRE-42 and GRE-444 114656~|~1~|~2~|~02/STR~|~Project to Pave inverts of bridge size culverts and perform other related repairs Including GRE-68 and GRE-343 114656~|~1~|~3~|~03/STR~|~plan split for the bridges less than 20 ft long on CLI-380 77555~|~1~|~2~|~02/NHS~|~Construction of new structures 77555~|~1~|~3~|~03/NHS~|~Rehabilitation of SFN 2300486 (FAI-33-2.92) 77555~|~1~|~1~|~01/NHS~|~Construction of an interchange on US 33. Closure of access points at Allen Road/US 33 intersections. 77555~|~1~|~4~|~04/STR~|~Roadway work along Pickerington Road (outside of ramp termini) and Benadum Road. 118703~|~1~|~1~|~01/STR~|~Superstructure replacement. 117710~|~1~|~1~|~01/BRO~|~Plan split for 80/20 Fed / State split for all work on project 82119~|~1~|~6~|~06/NFA~|~Work not eligible for Federal Funding. Includes bridge removal. SFN 1819984 82119~|~1~|~5~|~05/NHS~|~Interstate pavement work for capacity addition @ 80/20 82119~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. Demolition of existing Innerbelt Bridge Truss, SFN 1809393. 82119~|~1~|~2~|~02/IMS~|~Interstate bridge work on existing system @ 90/10. SFNs 1808788, 1809431, 1805584, 1807625, 1807684, 1808753, 1808931, 1808818, 1808842, 1807498, 1807714, 1808893, 1807773, 1812432, 1812386, 1806904 82119~|~1~|~8~|~08/IMS~|~100% state funded split for interest payments. 82119~|~1~|~3~|~03/NHS~|~Interstate bridge work for capacity addition @ 80/20. SFNs 1808788, 1809431, 1805584, 1807625, 1807684, 1808753, 1808931, 1808818, 1808842, 1807498, 1807714, 1808893, 1807773, 1812432, 1812386, 1806904 82119~|~1~|~4~|~04/IMS~|~Interstate pavement split for work on the existing system @ 90/10 82119~|~1~|~7~|~07/ENH~|~Project Work Eligible for Transportation Alternatives Funding, including Towpath Trail and Ontario Shared use path, @ 80% federal. 105284~|~1~|~2~|~02/STR~|~Plan Split for the rural section of CLE-28 105284~|~1~|~1~|~01/S>2~|~Plan Split for work in the Large Urban Sections of the project. 101445~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% (Vermilion) Urbanized Area Inside Corp. Limit (Paving Items):ERI 0006 27.80 to 29.54 101445~|~1~|~2~|~02/NHS~|~100% Local (Vermilion): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps, Curb, Curb Remove, Guardrail Items etc.): ERI 0006 27.80 to 29.54 101445~|~1~|~5~|~05/S<2~|~100% Local (Vermilion): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps, Curb, Curb Remove, Guardrail Items etc.): ERI 0060 08.98 to 09.86. 101445~|~1~|~4~|~04/S<2~|~Federal 80%/Local 20% (Vermilion) Urbanized Area Inside Corp. Limit (Paving Items): ERI 0060 08.98 to 09.86 101445~|~1~|~3~|~03/NHS~|~Structure ERI-6-28.93 Repair Expansion Joints. 98537~|~1~|~1~|~01/SAE~|~District Wide project for various striping and RPM work. Actual work locations to be determined 108720~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-030 94393~|~1~|~1~|~01/S<2~|~General System Resurfacing 94393~|~1~|~2~|~02/STR~|~General System Resurfaing 94393~|~1~|~3~|~03/SAF~|~Bike Lane on widened Shoulder SLM 07.52 TO 08.57. 94393~|~1~|~4~|~04/SAF~|~Funding for center Line rumble stripes Outside of Berlin. 105396~|~1~|~1~|~01/SAF~|~Restriping various County Routes. 103696~|~1~|~1~|~01/SAF~|~All work in this project. Funding from the Safe Routes to School Program. 80% SAC 4SC7 and 20% Toll Revenue Credit to being the funding to 100% federal. Funds needed over the cap are the responsibility of the Village of McComb. 99481~|~1~|~1~|~01/NFA~|~Village is constructing 1410 linear feet of roadway and storm drainage. 87452~|~1~|~1~|~01/ERD~|~Ferry Boat Discretionary Funds 87452~|~2~|~2~|~02/ERD~|~Added Plan Split for 100% Local Item (Pump-Out Station) 87452~|~2~|~3~|~03/ERD~|~Added Plan Split for CE of 100% Local Item (Pump-Out Station) 96102~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4201779 KNO USR 36 29.50 82474~|~1~|~1~|~01/STR~|~Overlay SR 571 with fine graded aggregateSR 571 SLM 15.16 to 20.73 82474~|~1~|~3~|~03/NHS~|~Construct turn lane at Kruckerburg RoadUSR 127 SLM 14.62 to 14.63 82474~|~1~|~2~|~02/S<2~|~Overlay SR 571 with fine graded aggregateSR 571 SLM 13.65 to 15.16 119957~|~1~|~1~|~01/S5K~|~added plan split. 106167~|~1~|~1~|~01/BRO~|~repair work eligible for bridge funds 114394~|~1~|~1~|~01/NHS~|~Culvert replacements. 114394~|~1~|~2~|~02/STR~|~Culvert rehab. 101079~|~1~|~1~|~01/IMS~|~RPMs 115763~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 27 3.96, SFN 5333016. Funded 100 federal. 102855~|~1~|~1~|~01/NFA~|~D09 Block Project FY22 98313~|~1~|~2~|~02/SAF/COLU~|~This is the 100% City funded waterline work. 98313~|~1~|~1~|~01/SAF/COLU~|~This is the safety program funded portion of the project. To install left-turn lanes on all approaches and a rt. turn lane on the west leg. Update traffic signal and intersection lighting. 107637~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 and SR 117 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). All work on SR 66 is in this plan split. Work on SR 117 from the Van Wert County line to the Lima Urbanized Area Limits at Wapak Road (SR 501) at 10.77. 107637~|~1~|~3~|~03/S<2/LIMA~|~Resurfacing of SR 117 inside of the City of Lima. Work on SR 117 from 17.11 to the City of Lima corporation limits at 18.28. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Lima. 107637~|~1~|~2~|~02/S<2~|~Resurfacing of SR 117 inside the Lima Urbanized Area but outside of any municipality. On SR 117 from the Lima Urbanized Area Limits at Wapak Road (SR 501) at 10.77 east to the end of the project at Seriff Road at 12.73 and from the City of Lima corporation limits at 18.28 until the end of the work at the concrete pavement just east of Leonard Avenue at 18.38. Federal and state District preservation program funds. No local funds. 107637~|~1~|~4~|~04/NFP/LIMA~|~Items paid 100% by the City of Lima. 101863~|~1~|~1~|~01/ENH~|~A multi-use path. 117568~|~1~|~1~|~01/NHS~|~added plan split. 88135~|~1~|~1~|~01/S>2~|~add local roadway connection on east side of IR75, aka GE parkway. Provide southbound IR75 ramp to GE Parkway from Glendale Milford Road. 92969~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Cos-SR 206-00.00 to 03.41; 2) Cos-SR 206-03.85 to 14.51; 92969~|~1~|~2~|~02/NFA~|~"02/NFA/OT/ " - District Preservation Marking Pavement 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on 1) Cos-SR 206-00.00 to 03.41; 2) Cos-SR 206-03.85 to 14.51; 116685~|~1~|~1~|~01/STR~|~All work is in this plan split. 100505~|~1~|~1~|~01/S<2~|~ROS 104 (17.41-17.98) 100505~|~1~|~2~|~02/STR~|~ROS 104 (17.98-22.19) 116741~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing. 122034~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding 86645~|~1~|~2~|~02/BRO~|~D6 funding for rehab (patching & sealing) on 1 bridges - BR eligible2502496 FRA US40 11.58 Intersect: Over Sr315 86645~|~1~|~1~|~01/NHS~|~Columbus urban paving on US-40/W Broad from SLM 10.55 - 12.27 86645~|~1~|~3~|~03/NHS~|~100% City of Columbus items 90440~|~1~|~1~|~01/NFA~|~Grade, shape, crack seal, chip seal and fog seal and resurface areas at the Auglaize County Fish Hatchery, Darke County Wildlife Area and the Mercer County Wildlife area at the Auglaize County Fish Hatchery along SR 364, Darke County Wildlife Area on USR 36, and Mercer County Wildlife Area on SR 703. 103738~|~1~|~1~|~01/ENH~|~SRTS Elyria City Schools 107286~|~1~|~1~|~01/IMS~|~Plan split for bridge work on the interstate 107286~|~1~|~2~|~02/NHS~|~Split for bridge work on the NHS 107286~|~1~|~3~|~03/NFA~|~Split 3 for repair work to the Towpath Trail under the Innerbelt Bridges 103366~|~1~|~1~|~01/STR~|~Emergency project to repair a landslide. WAS CR 79 1.29. DSR WAS-002. 96887~|~1~|~1~|~01/NFA~|~Bridge replacement. 120359~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order. 97721~|~1~|~1~|~01/MPO~|~Resurface Washington Street using local funds. 115637~|~1~|~1~|~01/IMS~|~Paving of old weigh station to convert it to a truck parking area on NB TUS-77 89366~|~1~|~1~|~01/ENH/Zoar~|~"01/ENH/OT/Zoar" - Construct a brick sidewalk and decorative lighting on each side of Main Street (SR 212 in the vllage of Zoar) from 5th St to 1st St, including ADA ramps and storm sewer relocation. 25492~|~1~|~1~|~01/IMS~|~Rehab pavement between LUC IR75 0-0.27, LUC IR75 0.91-1.66 and WOO IR75 30.71-32.88 120542~|~1~|~1~|~01/MPO~|~Federally eligible items. 117645~|~1~|~1~|~01/SAF~|~ITS maintenance on power services, fiber optics and other misc. related work 96412~|~1~|~1~|~01/NFP~|~Emergency bridge project. Beam replacement on WAS 50 0489L, SFN 8401381. Funded 100% state. 93100~|~1~|~1~|~01/NHS~|~Bridge maintenance to structure HAM-562-0147 to include spot painting, steel retrofits, and drainage repair. SFN: 3113914 and intersects: Ross Avenue;CS RR 113760~|~1~|~1~|~01/BRF~|~OBPP funded plan split 25440~|~1~|~1~|~01/NHS~|~SFN 7804652 SR82 18.05 OVER TRU SR46 7.31 111049~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing of N Main St from 7th St to Orion St in the City of North Canton. 114715~|~1~|~1~|~01/STR~|~Chipseal. 91461~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 13 0.08-2.71, 4.52-8.51, and 11.79-11.92. Rural other federal aid funded 80 federal/20 state. 91461~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 682 1.95-2.15 and 2.33-2.50 RT. Urban other federal aid in the City of Athens funded 80 federal/20 local. 91461~|~1~|~4~|~04/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 13 2.71-4.52 and MEG 33 1.12-1.20. NHS route funded 80 federal/20 state. 108284~|~1~|~1~|~01/NHS~|~Emergency repair project.BRO 52 15.20 BRO-001 124170~|~1~|~1~|~01/SAF~|~Safety funded scope. 116898~|~1~|~1~|~01/S>2~|~Resurfacing 92266~|~1~|~1~|~01/S<2~|~Culvert Construction/Repair 103077~|~1~|~1~|~01/BRF~|~Bridge replacement. 100629~|~1~|~1~|~01/STR~|~1" Fine Graded Polymer asphalt overlay on CAR-39 120298~|~1~|~1~|~01/SAF~|~Portsmouth SRTS project 118543~|~1~|~1~|~01/STR~|~Plan Split for STP Rural portion of project 91600~|~1~|~1~|~01/BRO~|~Replace bridge deck and paint structural steel. Limited approach work. SFN 5701597 MOT US 35 15.13 S 101895~|~1~|~1~|~01/S>2~|~SR-64 in Waterville. 101895~|~1~|~2~|~02/NFP~|~For items not eligible for urban paving and cost beyond cap. 115561~|~1~|~1~|~01/S50~|~Resurfacing of SR 65 in the City of Lima. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Lima. 115561~|~1~|~3~|~03/S50~|~Work such as excavation and full depth pavement repair aimed at the reconstruction of Central Avenue. 115561~|~1~|~2~|~02/CMQ~|~Work that is aimed at bicycle and pedestrian facilities. This includes lighting, sidewalks, curbs, bike lanes, signage, and other incidental work needed to complete these items. 115561~|~1~|~4~|~04/NFP~|~100% City cost items for utility work such as waterline relocation. 94537~|~1~|~1~|~01/STR~|~80% federal / 20% state using Geologic Site Management funding. 106153~|~1~|~1~|~01/STR~|~Landslide repair. MRG 37 9.01. DSR MRG-002. Rural other federal aid funded 80 federal/20 state. 75089~|~1~|~1~|~01/NHS~|~Replace existing deck on bridges (TUS-250-1412 L & R, SFN 7904894, 7904924) with new reinforced concrete deck and convert abutments to semi-integral. The bridges carry US 250 over SR 416. 100552~|~1~|~1~|~01/NHS~|~LAW 7/52 Sign MaintenanceUS 52 11.58-22.62SR 7 0.00-2.38 SR 7 6.36-6.44 100552~|~1~|~2~|~02/S<2~|~LAW 7 Sign Maintenance SR 7 2.30-6.36 95951~|~1~|~2~|~02/NFP~|~Traffic office renovation. 95951~|~1~|~1~|~01/NFP~|~Traffic office renovation 114507~|~1~|~1~|~01/IMS~|~resurfacing a section of HAM-275 92368~|~1~|~2~|~02/NHS~|~Structure at OTT-53-5.18 92368~|~1~|~1~|~01/NHS~|~resurface OTT SR 53 0.00 - 4.98 - Sandusky County Line to Helendale 89192~|~1~|~1~|~01/MPO~|~Two roundabouts funded with TMACOG (MPO) CMAQ located at: LUC CR124 1.23-1.24 and LUC CR133 2.15-2.16 124555~|~1~|~1~|~01/IMS~|~Deck rehabilitation of federally eligible bridge on the interstate. 119114~|~1~|~1~|~01/S>2~|~Resurfacing. 119114~|~1~|~2~|~02/STR~|~Resurfacing. 100330~|~1~|~2~|~02/NFA~|~Chip seal non-federal state route LOG SR 287 0.00 to 11.00 100330~|~1~|~1~|~01/STR~|~Chip seal various routes in the District CHP SR 29 2.68 to 10.08 CHP SR 245 10.82 to 17.06 CHP SR 296 5.98 to 10.52 CHP SR 559 7.88 to 1138 CLA SR 41 0.00 to 3.63 CLA SR 54 6.01 to 10.06 92696~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7 (90% Federal)/4PS7 (10% State) - No CAP - Backwall repairs and approach slab work for 1) 4502884 Lic IR70 00.74L Intersect: over TR 36 Palmer Rd; 2) 4502914 Lic IR70 00.74R Intersect: over TR 36 Palmer Rd; 3) 2301598 Fai IR70 00.84R Intersect: Blacklick Creek; 4) 2301563 Fai IR70 00.84L Intersect: Blacklick Creek; 5) 2301628 Fai IR70 01.19L Intersect: over SR 256; 6) 2301652 Fai IR70 01.19R Intersect: over SR 256; 124519~|~1~|~1~|~01/SAF/ASD~|~Pavement Marking of various Ashland County Roads. 124519~|~1~|~2~|~02/STR/ASD~|~Pavement Marking of various Ashland County Roads 91069~|~1~|~1~|~01/NHS~|~District Allocation - 80/20 112977~|~1~|~1~|~01/S>2~|~Line the bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown. 104771~|~1~|~1~|~01/NFP~|~District wide crack sealing. 120731~|~1~|~1~|~01/NFA~|~Created for J&C involvement. 84853~|~1~|~1~|~01/ENH~|~Minor rehabilitation of pedestrain bridge HAM-71-0571. Project to include addition of ADA ramps, painting of structural steel, upgrade of fence and rail, and raise superstructure 84853~|~2~|~2~|~02/IMS~|~Added repair as a second plan split. 112337~|~1~|~1~|~01/NFP~|~Reconstruction of the NB WAS 77 Rest Area parking lot. Funded 100% State. 105859~|~1~|~1~|~01/STR~|~See linked structure > 20' span. 92955~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - ODOT Facilities - No CAP -Facilities' project to install sanitary sewer lines at the restarea on IR 77 in Guernsey County at the 00.36 mile marker north bound and 2.93 mile marker south bound. 123497~|~1~|~1~|~01/STR~|~Resurfacing for project using an asphalt overlay treatment. 123497~|~1~|~2~|~02/NFA~|~Resurfacing for project using an asphalt overlay treatment. 97113~|~1~|~4~|~04/BRF/CCEO~|~"04/BRF/OT/CCEO" - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 1631608; Cos-TR 90-00.01 - BR Eligible for Replacement: Length = 45'; SD/FO = (1); SDR = 29.5; DR = "6" 97113~|~1~|~2~|~02/BRF/MCEO~|~"02/BRF/OT/MCEO - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 6035639; Mus-CR 427-00.05 - BR Eligible for Replacement: Length = 26'; SD/FO = (1); SDR = 22.3; DR = 5 97113~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/OT/MCEO - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 6038174; Mus-CR 71-06.30 - BR Eligible for Replacement: Length = 60'; SD/FO = (1); SDR = 22.8; DR = 6 97113~|~1~|~3~|~03/BRF/MCEO~|~"03/BRF/OT/MCEO - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 6037461; Mus-TR 128-02.93 - BR Eligible for Replacement: Length = 86'; SD/FO = (1); SDR = 32.5; DR = 5 114164~|~1~|~1~|~01/SAF~|~Split for signal work at SR-175 & Cedar Rd 93449~|~1~|~2~|~02/NHS~|~General system paving of FRA-161: 7.11-7.35, 7.38-7.48, 7.52-7.76, 7.92-8.67 93449~|~1~|~1~|~01/NHS~|~Columbus urban paving of FRA-161: 5.76-7.11, 7.35-7.38, 7.48-7.52, 7.76-7.92 93497~|~1~|~1~|~01/IMS~|~90/10 Pvmt Reconst, No Added Capacity (84% of pvmt quantitites) 93497~|~1~|~2~|~02/NHS~|~80/20 Pvmt Reconst, Added Capacity (16% of pvmt quantitites - add 4th lane in median) 93497~|~1~|~3~|~03/IMS~|~90/10 Rehab of 10-20' span structures, Reconst, No Added CapacityFRA-71-10.40 Brown RunFRA-71-12.34 Rancid Ditch 93497~|~1~|~5~|~05/NHS~|~80/20 >20' span structures, Bridge Rehab, Added Capacity (16% of quantities)FRa-71-10.48L 270 Ramp AFRA-71-10.48R 270 Ramp AFRA-71-10.65L 270FRA-71-10.65R 270FRA-71-11.74L Big Run CkFRA-71-11.74R Big Run Ck 93497~|~1~|~4~|~04/IMS~|~90/10 >20' span structures, Bridge Rehab, No Added Capacity (84% of quantities)FRA-71-10.48L 270 Ramp AFRA-71-10.48R 270 Ramp AFRA-71-10.65L 270FRA-71-10.65R 270FRA-71-11.74L Big Run CkFRA-71-11.74R Big Run Ck 93497~|~1~|~6~|~06/IMS~|~90/10 >20' span structures, Bridge Replacement, No Added Capacity (84% of quantities)FRA-71-12.79L Frank RdFRA-71-12.79R Frank RdFRA-71-14.36L Greenlawn AveFRA-71-14.36R Greenlawn Ave 93497~|~1~|~7~|~07/NHS~|~80/20 >20' span structures, Bridge Replacement, Added Capacity (16% of quantities)FRA-71-12.79L Frank RdFRA-71-12.79R Frank RdFRA-71-14.36L Greenlawn AveFRA-71-14.36R Greenlawn Ave 93497~|~1~|~8~|~08/IMS~|~90/10 Project eligible utility cost - power pole relocation 102642~|~1~|~1~|~01/STR~|~D10 Chip Seal FY 2025 North. WAS-339-21.38-24.77. 102642~|~1~|~2~|~02/NFA~|~D10 Chip Seal FY 2025 North: Noble SR 147-0.00-2.60. 98232~|~1~|~2~|~02/NHS~|~Bridge Rehab Interstate - Widening - FRA-70-23.74 (SFN 2505681)-18% 98232~|~1~|~3~|~03/IMS~|~Resurfacing of ex IR-70 WB from E of Brice Rd to W of I-270. Resurfacing of ex IR-270NB. Work to include the replacement of ex storm sewer, ex underdrains, ex RW fence, traffic control, lighting, ITS and other ancillary items. 98232~|~1~|~1~|~01/NHS~|~Widening of IR-70 WB from E of Brice Rd to W of I-270 including CD lane. Extension of ex culvert (CFN 1825905). Work to include Retaining walls, Noise Walls, Proposed Storm Sewer and other ancillary items. 98232~|~1~|~4~|~04/IMS~|~Bridge Rehab Interstate - Existing Width - FRA-70-23.74 (SFN 2505681)-82% 98232~|~1~|~5~|~05/S>2~|~Bridge Rehab - FRA-BPFRW-41.060 (SFN 2564106)-100% 98232~|~1~|~7~|~07/IMS~|~FRA-70-23.92 (SFN 2505742)- New Brice Rd Structure over IR 70 WB-CD 98232~|~1~|~8~|~08/IMS~|~Bridge Replacement - Existing Width - FRA-70-23.92 (SFN 2505738)-60% 98232~|~1~|~9~|~09/NHS~|~Bridge Replacement - Widening - FRA-70-23.92 (SFN 2505738)- 40% 98232~|~1~|~6~|~06/S>2~|~Items of work due to Interchange reconfiguration and widening. Widening/Resurfacing of Lake Club (MR-1183), Tussing (MR-4374), Brice (CR-117) and Chatford DR. Culvert Extension of 84" under Brice Rd. Culvert Replacement under Chatford Dr. due to widening of I-70. Work to include waterline work, storm sewer, underdrains, traffic control and other ancillary items. 123526~|~1~|~1~|~01/S>2~|~CEAO Local Bridge Program funding for HAM CR374 Newton Rd Bridge Rehab 85401~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for federal urban paving funds 85401~|~1~|~2~|~02/NFP~|~Pavement work not eligible for federal-aid 112906~|~1~|~1~|~01/IMS~|~MRW-71 from 19.53 to 19.92 112906~|~1~|~2~|~02/STR~|~MRW-61 from 8.84 to 13.18 and 14.83 to 20.51. MRW-97 from 2.46 to 3.68. MRW-42 from 4.94 to 6.86. 118539~|~1~|~1~|~01/BRF~|~Plan Split for Municipal Bridge Program funds 119898~|~1~|~1~|~01/NFA~|~NEVI Round 2 15-A 99492~|~1~|~1~|~01/NFP~|~Mowing contract 91877~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No CAP - Mus-SR 93 from 07.16 to the 15.02 - Treatment is 10% Surface Repair, 1" Mill and 3" Asphalt Overlay 113333~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (100% State - No CAP - Project to repair and replace damaged Guardrail District Wide 110135~|~1~|~1~|~01/S5K~|~Small Urban section of PRE-122 110135~|~1~|~2~|~02/STR~|~Resurfacing on the Rural portion of the project PRE-122 114714~|~1~|~1~|~01/NHS~|~Overlay 100321~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay of MAH SR 534 from 4.48 to 8.49, POR SR 88 from 12.63 to 13.70, POR SR 303 from 13.74 to 17.77. 100321~|~1~|~2~|~02/S<2~|~Fine graded polymer AC Overlay of POR SR 88 from 11.13 to 12.63. 115714~|~1~|~1~|~01/NFP~|~Established CO CC 1 - District Preservation Funds - 100% State (4PS7) 98689~|~1~|~1~|~01/NHS~|~Construction of connector between Duck Creek Road and Madison Road at MedPace Drive. 107317~|~1~|~2~|~02/NFP~|~Split for ding & dent repair work 107317~|~1~|~1~|~01/NHS~|~Split for guardrail upgrading 107317~|~1~|~3~|~03/IMS~|~Guardrail work on interstate 110563~|~1~|~1~|~01/IMS~|~Replace Bridge HAM-74-1335 (Race Road over I-74). Raise profile as necessary. 109139~|~1~|~1~|~01/NHS~|~Bridge deck replacement project. MEG 7 7.59 L (SFN 5300150) and R (SFN 5300169). 119841~|~1~|~1~|~01/NFP~|~Created for J&C involvement 118708~|~1~|~1~|~01/S>2~|~Superstructure replacement. 118708~|~1~|~2~|~02/STR~|~Superstructure replacement. 102821~|~1~|~1~|~01/S<2~|~STP<2 Pavement US 127 4.09-5.71 102821~|~1~|~2~|~02/STR~|~STP rural pavement 102821~|~1~|~3~|~03/STR~|~STP rural bridge 107499~|~1~|~1~|~01/STR~|~Resurfacing HAS-519 107499~|~1~|~2~|~02/NFA~|~Chip sealing access roads along IR 77. 87091~|~1~|~2~|~02/S>2~|~Split to include all work associated with bridges CLE-28-0258, CLE-28-0310, CLE-28-0341, and CLE-28-0364. 87091~|~1~|~1~|~01/S>2~|~Resurfacing a portion of SR 28 in Clermont County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. 116115~|~1~|~1~|~01/STR~|~Resurfacing outside the Marysville Urban Area. CR 1-3.260 to 7.598. 115003~|~1~|~2~|~02/S>2~|~Pedestrian Improvements 115003~|~1~|~3~|~03/SAF~|~HSIP funded - Signal replacement and related intersection improvements at Woodman and Eastman 115003~|~1~|~1~|~01/NHS~|~Roadway full depth reconstruction including storm sewer and aggregate base. The project will also include the installation and replacement of sidewalks. 101350~|~1~|~1~|~01/IMS~|~Bridge painting. 88875~|~1~|~1~|~01/STR~|~District Allocation 95663~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment from the village limits of Malta to the village limits of Stockport. MRG CR 2 3.70-12.86. Work also includes pavement markings and RPM's. Funded 80 federal/20 local. 93084~|~1~|~1~|~01/NFA~|~Rehabilitation of MOE CR 26 0.00-1.63. Work includes road bed stabilization, new base and new asphalt pavement. ODOD 629 funds, 100% State; ARC funds, 80% Federal/20% State; Jobs and Commerce funds, 100% State; Private funds. 117258~|~1~|~1~|~01/SAF~|~Provide wrong way detection at several interchanges 122169~|~1~|~1~|~01/SAF~|~All work included in this plan split. 88133~|~1~|~2~|~02/IMS~|~Bridge Split 88133~|~1~|~1~|~01/IMS~|~add fourth lane and auxiliary lane for northbound between galbraith and shepherd 88133~|~1~|~3~|~03/IMS~|~Rehabilitation of pavement as part of the widening of I75 from Galbraith to Shepherd northbound only, for an additional lane with auxiliary lane 102743~|~1~|~1~|~01/NHS/CANT~|~Resurfacing, urban paving in the City of Canton. 102743~|~1~|~3~|~03/S>2/CANT~|~Resurfacing, urban paving city of Canton. 102743~|~1~|~2~|~02/NHS/CANT~|~Full and partial depth repairs and ADA curb ramps where needed. 104092~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Athens County. CEAO funded. Funded 100% federal. 95556~|~1~|~3~|~03/NFP~|~100% local participation for work items such as VCP material cost and decorative artwork. 95556~|~1~|~1~|~01/MPO~|~80/20 federal/local split using MPO STP (SAC 4TA7) to resurface E. 22nd Street from Orange Avenue to Euclid Avenue. 95556~|~1~|~2~|~02/ENH~|~80/20 federal/local funding split using MPO enhancement funding for streetscaping. 89487~|~1~|~1~|~01/S>2~|~Geotechnical funding for Retaining Wall 89400~|~1~|~1~|~01/STR~|~On SR327, 0.05 mile south of Woodrow Hole Road (SLM 19.50 to 19.57), it is proposed to cut back an existing rock face along the east side of the roadway. 80/20 split 01/STR/OT/State 104997~|~1~|~1~|~01/NFP~|~District Preservation Other Funding - 4PS7 (100% State) - No CAP - Annual RPM Replacement Project 102906~|~1~|~1~|~01/MPO~|~Resurfacing of Center Street in the City of New Franklin. 99500~|~1~|~2~|~02/NFA/KCEO~|~Knox County CEAO Minor Collector Resurfacing project - 4B77 (Federal 80%) / LNTP (Local 20%) - See CAP Comments - Resurfacing on Kno-CR 21-00.00 to 00.33 99500~|~1~|~1~|~01/STR/KCEO~|~ Knox County CEAO Resurfacing project - 4B77 (Federal 80%) / LNTP (Local 20%) - See CAP Comments - Resurfacing on Kno-CR 21-00.33 to 01.57 83844~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 124 29.62-36.88. Rural other federal aid funded 80 federal/20 state. 83844~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 33 28.68-28.79. NHS route funded 80 federal/20 state. 88281~|~1~|~1~|~01/SAF/SoP~|~LAW South Point SRTS Project - Safe Routes to SchoolIn the Village of South Point, it is proposed to construct sidewalks, curb ramps, school zone signage, and pavement markings along the perimeter of the new elementary school along Park, High, Seventh, and Washington. 100% Fed 92445~|~1~|~1~|~01/NHS~|~Federal funds and state funds from the ODOT Central Office Geologic Site Management (GSM) program. Funds over the GSM cap will be provided by the District using District Preservation Program funds. No local funds. Not in the City. 80% SAC 4SF7 and 20% SAC 4SS7 for the GSM funds and 80% SAC 4PF7 and 20% SAC 4PS7 for the District funds. 116563~|~1~|~1~|~01/S50~|~Plan Split for bridge work 107604~|~1~|~1~|~01/STR~|~SFN 6202071. Span length 17 feet 96965~|~1~|~1~|~01/NFP~|~Added plan split due to funding 93832~|~1~|~1~|~01/STR~|~Brdg replacementProject Termini: On SR134, located 1 mile north of SR286. Project Description: It is proposed to replace the structure, SFN 3602400. 80/20 split01/STR/BR/State 106250~|~1~|~1~|~01/NFA~|~The LEDC will construct a two lane rd in the Point Industrial Park between Commerce Dr and Eisenhower Rd to support heavy manufacturing development. 92122~|~1~|~1~|~01/IMS~|~resurface WOO IR 75 26.02-30.69 - SR-199 to Glenwood 102890~|~1~|~2~|~02/NHS~|~Invert PavingJAC 35 2.48 4000056JAC 35 14.79 4000544 102890~|~1~|~1~|~01/STR~|~Invert PavingADA 125 6.33 0103039HIG 50 22.32 3600904HIG 62 6.82 3601102HIG 753 10.45 3604233LAW 775 6.17 4404513LAW 775 8.40 4404602 102890~|~1~|~4~|~04/S<2~|~Invert PavingROS 41 14.48 1846211 102890~|~1~|~3~|~03/STR~|~Invert PavingADA 41 32.24 1878662ADA 125 18.37 1880350ADA 247 18.19 1876138HIG 62 23.43 1812751HIG 72 1.00 1804553ROS 41 14.02 1846208 85153~|~1~|~1~|~01/BRO~|~Plan Split SFN 7832621 TRU Hubbard Thomas Road over Little Yankee Run 87353~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 101309~|~1~|~1~|~01/S>2~|~Plan Split for the non-NHS portion on HAM-50 between SLM 30.28-34.14 101309~|~1~|~2~|~02/SAF~|~Mid-block pedestrian crossing. 113744~|~1~|~3~|~03/NHS~|~All items associated with Bridge work. 113744~|~1~|~1~|~01/NHS~|~Reconfigure the interchange of US 33/James Rd/Winchester Pike and add RCUT at US 33 and Petzinger Rd. Provide U-turn at Schaff Rd. All full depth pavement replacement areas and all items of work associated with the reconfiguration of the interchange and the full depth replacement areas. 113744~|~1~|~2~|~02/NHS~|~Resurfacing of pavement adjacent to Safety work - US 33 on the east end of the project, James Rd, Ramp B and Ramp BB.It also includes minor pavement repairs, guardrail upgrades and other miscellaneous items of work. 76980~|~1~|~1~|~01/IMS~|~Resurfacing 91822~|~1~|~1~|~01/NHS~|~Priority System concrete pavement rehabilitation on JEF-22-14.96 to 16.44 and JEF-7-17.62 to 17.99 and 18.90 to 19.21; 3.25" asphalt resurfacing including pavement repairs, lighting, guardrail replacement, and pavement marking 96606~|~1~|~1~|~01/NHS~|~The project is programmed to rehabilitate bridge BEL-7-0099 (SFN 0700061) by replacing the existing reinforced concrete deck with a new reinforced concrete deck to be made composite with the existing beams. The existing beams will be painted. All bearings will be replaced with elastomeric bearings and the substructure units will be repaired. 121897~|~1~|~1~|~01/SAF~|~Construct sidewalk, ADA curb ramps, and a pedestrian crossing on Cottonville Rd (TR-77) from Greeneview High School to Greeneview Middle School in the Village of Jamestown. 103269~|~1~|~1~|~01/SAF~|~District wide Raised Pavement Markers. 123826~|~1~|~1~|~01/STR~|~Plan Split for STP Rural 123826~|~1~|~2~|~02/NHS~|~NHS Funding Split 123826~|~1~|~3~|~03/NFA~|~Plan split for Not on Federal Aid System 115403~|~1~|~1~|~01/NFA~|~Plan split for federally eligible items in construciton/CE 103941~|~1~|~1~|~01/SAF~|~Re-striping the intersection of Wooster and Hopocan. 91971~|~1~|~1~|~01/STR~|~BRO 125 11.86-22.93BRO 774 3.22-10.93 91971~|~1~|~2~|~02/STR~|~BRO SR 125 & SR774 0802336 BRO SR125 12.340802417 BRO SR125 18.110802441 BRO SR125 18.220804258 BRO SR774 6.43 0804290 BRO SR774 10.5 80/20 split 94556~|~1~|~2~|~02/S>2~|~Pavement, planning and resurfacing SR 48 from 4.44 to 4.48 within Washington Township 94556~|~1~|~1~|~01/S>2~|~Pavement, planing and resurfacing with asphalt concrete on SR 48 from 3.26 to 4.44 117307~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 147 over Dog Hollow. 109678~|~1~|~1~|~01/STR~|~AC Overly with Repairs on: CLI-350 SLM 4.20 to 7.91 109678~|~1~|~2~|~02/SAF~|~Centerline rumble stripes. 90989~|~1~|~1~|~01/S>2~|~Extension of Cosgray Road 96316~|~1~|~1~|~01/STR~|~Resurfacing 96316~|~1~|~2~|~02/STR~|~Bridge Work: WAY-94-1.80 / WAY-94-4.66 118472~|~1~|~1~|~01/MPO/HARR~|~Split for non-bridge related reconstruction costs (widening the I-74 off ramps, adding ramp meters, reconstructing traffic signals). 118472~|~1~|~2~|~02/BRO/HARR~|~Plan split for the bridge widening work to add left turn lanes from Dry Fork Road onto the I-74 on ramps and addition of sidewalk on the bridge. 118472~|~1~|~3~|~03/SAF/HARR~|~Plan split for TSMO funds that are being used for traffic signal reconstruction at the intersection of Dry Fork Road with the I-74 ramps. 96785~|~1~|~1~|~01/SAF~|~Guardrail installation/replacement project on various routes and sections in Gallia Co. CEAO funded using HSIP. Funded 100% safety. 90217~|~1~|~2~|~02/MPO~|~This split is for work that is not under the CMAQ split. MPO-STP funds are used in this split. 90217~|~1~|~1~|~01/CMQ~|~This split is for work elibible for CMAQ funds. The CMAQ eligibility was approved in an April 14, 2014 letter. 106224~|~1~|~1~|~01/CMQ~|~Intersection Improvement in the City of Franklin. 106224~|~2~|~2~|~02/BRF~|~Split for the cost to replace SFN 8360545, required as part of realigning Beal Road at SR-123. 114315~|~1~|~1~|~01/NFP~|~Established Plan Split 1 - "01/STR/OT/ " 112908~|~1~|~1~|~01/NFA~|~ADA 137 0.00-3.56 112908~|~1~|~2~|~02/STR~|~ADA 247 7.41-17.12 112908~|~1~|~3~|~03/NFA~|~Bridge PM. 112908~|~1~|~4~|~04/STR~|~Bridge PM. 112908~|~1~|~5~|~05/NFA~|~ADA ODNR Tranquility Wildlife Area 101694~|~1~|~1~|~01/NHS~|~NHS 80/20 District Allocation/City of Huron 101694~|~1~|~2~|~02/NHS~|~NHS 100% City of Huron 109998~|~1~|~1~|~01/NHS~|~Guardrail 109998~|~1~|~2~|~02/SAE~|~Guardrail on MED-71 to close that existing gap where a fatal crash occurred last November. 76703~|~1~|~1~|~01/IMS~|~LUC IR75 6.7-8.37 95801~|~1~|~1~|~01/NHS~|~from SLM 5.04 to SLM 11.65 95801~|~1~|~2~|~02/NHS~|~WOO-6-6.85 95801~|~1~|~3~|~03/SAF~|~Center Line rumble stripes. 89437~|~1~|~2~|~02/MPO~|~ Resurface and reconstruct Dayton Road on Dayton-Springfield Road from Enon North Corporation Limit to Springfield West Corporation Limit CLA CR 333 3.92 to 4.84. 89437~|~1~|~3~|~03/MPO~|~ Resurface and reconstruct Dayton Road on Dayton-Springfield Road from Enon North Corporation Limit to Springfield West Corporation Limit CLA CR 333 7.27 to 8.99. 89437~|~1~|~1~|~01/MPO~|~ Resurface and reconstruct Dayton Road on Dayton-Springfield Road from Enon North Corporation Limit to Springfield West Corporation Limit CLA CR 333 4.84 to 7.27. 92853~|~1~|~1~|~01/STR~|~ADA SR247 1.20 Slide Repair On SR247, 0.85 mile north of its US52 junction. 80 Fed/20 State01/STR/OT/State 110134~|~1~|~1~|~01/STR~|~All routes except CRA SR 0039 00.00-03.40 & WAY SR 0604 04.27-07.56. 110134~|~1~|~2~|~02/NFA~|~ CRA SR 0039 00.00-03.40 & WAY SR 0604 04.27-07.56 Only on this split. 111500~|~1~|~1~|~01/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): WAY-302-1.86 to 2.59 (LT)WAY-302-1.86 to 3.82(RT) 111500~|~1~|~2~|~02/S<2~|~100% Local (Wooster): Urbanized Area Inside Corp. Limit (Items Such as Pavement RepairWAY-302-1.86 to 2.59 (LT)WAY-302-1.86 to 3.82(RT) 111500~|~1~|~3~|~03/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?): WAY-SR 302: 2.59 to 03.82(LT)WAY-SR 83: 8.87 to 9.09 111500~|~1~|~4~|~04/NHS~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?): WAY-US 250: 14.44 to 14.60 (LT/RT) 102117~|~1~|~1~|~01/S<2~|~Landslide repair. 105889~|~1~|~3~|~03/NHS~|~Main Interchange Plan split for SB Ramp Bridge. 105889~|~1~|~1~|~01/NHS~|~Main interchange plan split - Pavement - NHS Only 105889~|~1~|~2~|~02/S>2~|~Plan Split for primary Interchange work - Non-NHS road segments 105889~|~1~|~4~|~04/NHS~|~Plan Split for NB Ramp bridge replacement 105889~|~2~|~9~|~09/NHS~|~Plan Split for 100% Locally funded portions of Urban Paving scope in Sylvania - e.g. Full Depth Repairs 105889~|~2~|~10~|~10/NHS~|~Plan Split for Non-Sylvania resurfacing on SR 51. Funding by District Allocation 105889~|~2~|~8~|~08/NHS~|~Part 2 plan split for Urban paving of SR 51 from interchange termini to Whiteford road. 105889~|~1~|~5~|~05/NHS~|~Plan split for widening and rehabilitation of LUC-51-1285L bridge & deck patching for LUC-23-1165L bridge - District 2 funds 105889~|~1~|~6~|~06/NHS~|~Plan split for vandal fence and bridge aesthetic upgrades for SFN 4805224 105889~|~1~|~7~|~07/NHS~|~Bridge aesthetic items plan split 121302~|~1~|~1~|~01/STR~|~All Work is within this split 112918~|~1~|~1~|~01/STR~|~ROS 50 0.00-4.00 112918~|~1~|~2~|~02/SAF~|~Centerline Rumble Stripe 112918~|~1~|~3~|~03/STR~|~Bridge maintenance. 112918~|~4~|~4~|~04/NFA~|~Retroactive fuel price adjustment 112918~|~1~|~5~|~05/NFP~|~Retro fuel price adjustment 90358~|~1~|~1~|~01/STR~|~Culvert Replacement 89541~|~1~|~1~|~01/SAF~|~This is a High Risk Rural Road funded project that proposes to eliminate a horizontal curve (approx. SLM 13.35) that is experiencing a high number of run off the road crashes that seem to be related to the deficient horizontal and vertical alignment at this location. 99615~|~1~|~1~|~01/IMS~|~Repair structure BEL-470-0322 (SFN 0706264) by removing the existing asphalt concrete overlay and providing a new rigid concrete overlay. Additional work to include replacement of parapets, backwalls, expansion joints and approach slabs, structural steel repairs to address section loss. Project will also remove a structure mounted traffic sign and place on an independent support. Vandal protection fencing will be added to the structure. 116664~|~1~|~1~|~01/STR~|~plan split for the retaining wall/drainage repairs along WAR-350 116664~|~1~|~2~|~02/STR~|~Conduit linked to funding event 101540~|~1~|~1~|~01/S<2~|~Sidewalk project along HIG Hobart/Carl Smith Drive. 123579~|~1~|~1~|~01/STR~|~All work within this split. Ellis will not allow Improvement Code to be selected and crashes often creating this funding event... 105706~|~1~|~1~|~01/NFP~|~plan split 121263~|~1~|~1~|~01/NHS~|~Resurfacing. 110172~|~1~|~2~|~02/IMS~|~Line conduit. 110172~|~1~|~3~|~03/STR~|~Structural spray lining of conduit 110172~|~1~|~1~|~01/S<2~|~Line 3 conduits. Jack and bore 2 conduits. 100316~|~1~|~1~|~01/CMQ~|~Provide pedestrian access by constructing sidewalks along the south side of Lyons Rd. and then along the West side of SR 741. 100316~|~1~|~2~|~02/S>2~|~Making profile adjustments to the bridge to the roadway. installation of backer rod with joint repair to prevent the continuance of the ramping problem. Estimated 25 feet of resurfacing will also be needed. 118736~|~1~|~1~|~01/SAF~|~PM project in Scioto County. 115123~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. 93138~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Resurfacing with related work on Fai-SR 664-07.47 to 12.62 110223~|~1~|~1~|~01/NFA~|~BRO 221 5.54 reactive maintenance. 89698~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all enhancement eligible items of work. 106850~|~1~|~2~|~02/ENH~|~Trans. Alternatives funding for Sidewalk, curb and lighting 106850~|~1~|~1~|~01/ENH~|~Reconstruction of Jefferson St - Pavement reconstruction items 94961~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split. 116808~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the city of Akron. 116808~|~1~|~2~|~02/S>2/AKRO~|~Resurfacing, urban paving in the city of Akron. 116808~|~1~|~3~|~03/NHS~|~Resurfacing. 88846~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% federal STP) / 4PS7 (20% state) - No cap - Resurfacing on SR67 in Hardin County from the Auglaize County line at slm 0.00 to Jct. SR 117 (overlap with SR 117) at 1.59; on SR117 in Hardin County from Jct. SR 67 slm 1.59 to the Logan County line at 6.14; and, on SR235 in Hardin County from the Logan County line at slm 0.00 to SR 117 at 0.44. 101771~|~1~|~1~|~01/MPO~|~Widening of Maple Avenue to provide bike lanes, pavement repair and resurfacing, upgrade of traffic signals at two intersections, installation of rectangular rapid flashing beacons (RRFBs) at unsignalized pedestrian crossings, and application of new pavement markings. 101771~|~1~|~2~|~02/MPO~|~Plan split for 100% Local Water Line work. 116247~|~1~|~1~|~01/STR~|~AC Overlay with Repairs 116247~|~1~|~2~|~02/S5K~|~Overlay on BRO-41 116247~|~1~|~3~|~03/STR~|~Overlay on BRO-41- Bridge preventative maintenance. 90463~|~1~|~1~|~01/CMQ/NC~|~Traffic signal coordination / upgrade along North Main Street between Everhard Road and Applegrove Street, in the City of North Canton, Stark County, Ohio. 123994~|~1~|~1~|~01/SAF~|~Roadway departure countermeasures with Safety funding. 123994~|~1~|~2~|~02/NFP~|~Locally funded safety improvements 120812~|~1~|~1~|~01/ENH~|~Shared use path repairs utilizing 100% Federal funds (TAP and Safety) up to Federal maximum. 109722~|~1~|~1~|~01/STR~|~Landslide repair project NOB 340 4.10 using 100% State (4BE7) funds. 98252~|~1~|~1~|~01/STR~|~Preventive Maintenance - Chipseal 107348~|~1~|~1~|~01/NFP~|~D09 Bridge Debris Removal FY19PIK-32-13.74L SFN 6601669PIK-23-8.37R SFN 6600328PIK-23-11.56 SFN 6600573ROS-23-9.26L SFN 7100396ROS-50-19.26 SFN 7103301ROS-159-0.42 SFN 7104189ROS-35-19.19L SFN 7101988ROS-35-19.19R SFN 7102011SCI-348-17.51 SFN 7305796 76009~|~1~|~1~|~01/STR~|~Federal Emergency project Disaster event OH11-01 DSR COL-024 to fix landslide and rockfall site. 84562~|~1~|~1~|~01/S>2~|~Plan Split for MAH SR 170 12.56 to 15.54 and MAH US 62 19.57 to 21.61. 112861~|~1~|~1~|~01/NHS~|~Smoothseal on PIK 32 119262~|~1~|~1~|~01/IMS~|~Mowing. 116723~|~1~|~1~|~01/NFA~|~All work is in this plan split. 104875~|~1~|~1~|~01/IMS~|~Mowing contract in Clinton, Greene, Preble and Warren counties. 100772~|~1~|~1~|~01/STR~|~Resurfacing HOL-83 from SR 39 to the Holmesville NCL, including asphalt overlay, pavement repairs and pavement markings. 97656~|~1~|~1~|~01/SAF~|~Install HAWKs signals on Hayden Rd and Morse Rd 84882~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" Fairfield County project to replace existing structure on Twsp Road 160 (Ducan Road) over Muddy Prairie Run with new structure. CEAO Federal Max of $557,600 112420~|~1~|~1~|~01/IMS~|~Fine poly AC overlay 85688~|~1~|~1~|~01/BRO~|~Replace deck and steel on Hudson over I-71, BR eligible.01/BRO/BR/ 85688~|~1~|~2~|~02/BRO~|~100% items requested by the City of Columbus 114183~|~1~|~1~|~01/MPO~|~Application of a Biorestor Asphalt Rejuvenator on both trails; also replacing a failing culvert south of Husted Road on the Little Miami Scenic Trail 85106~|~1~|~1~|~01/STR~|~General system resurfacing of BEL-147 Nob. Co. line to Belmont WCL; includes pavement, pavement repairs, pavement marking 100883~|~1~|~2~|~02/SAF~|~Type A End Treatment upgrades using safety funding. 100883~|~1~|~1~|~01/STR~|~D09 Guardrail Project FY21 - LAW 775 7.16-7.22 95212~|~1~|~1~|~01/STR~|~Mowing Contract 103167~|~1~|~1~|~01/IMS~|~Split for sign support repair 107513~|~1~|~1~|~01/STR~|~Resurfacing JEF-213 92024~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 1809873; CUY-175-1273 87825~|~1~|~3~|~03/BRO~|~BR Funded Bridges: 8705852 WOO IR280 4.48 Intersect: Cedar Creek 8705887 WOO IR280 4.53 Intersect: Cedar Creek 8705917 WOO IR280 5.02 Intersect: Dry Creek 8705941 WOO IR280 5.24 Intersect: Norfolk Southern Rr 87825~|~1~|~1~|~01/IMS~|~resurface Interstate sections LUC IR280 0-1.62 and WOO IR280 3.73-6.63 87825~|~1~|~2~|~02/IMS~|~8705909 WOO IR280 4.58 Intersect: Cedar Creek ( Non BR eligible ) 103396~|~1~|~1~|~01/STR~|~Slide repair 78425~|~1~|~1~|~01/IMS~|~Multi lane minor rehabilitation pavement project milling off 7" and replacing 8 1/4" on MIA 75 SLM 18.90 to 19.954 and SHE IR 75 0.00 to 8.10 78425~|~1~|~2~|~02/IMS~|~Painting of structural steel on SFN 7501447 87607~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - Project Impact Advisory Council (PIAC) Funding 5PI7 (80% Federal) / 4PI7 (20% State) - CAP = $2,100,000.00 for CO; District to provide corresponding CE costs - MOT during grouting operations on Mus-IR 70-15.24 to 15.89. 87607~|~1~|~2~|~02/IMS~|~"02/IMS/PV/ " - Geological Site Management 4SF7 (50% Federal)/4SS7(50% State) - Total Project Construction CAP 4SF7/4SS7=$5,688,102.00; - Resurfacing after Mine Void filling on Mus-IR 70-15.24 to 15.89 87607~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (50% Federal)/4SS7(50% State) - Total Project Construction CAP 4SF7/4SS7=$5,688,102.00 - Mine Void filling on Mus-IR 70-15.24 to 15.89 87607~|~2~|~4~|~04/S<2~|~"04/S<2/OT/ " - Geological Site Management 4SF7 (50% Federal)/4SS7(50% State) - Total Project Construction CAP 4SF7/4SS7=$5,688,102.00; - Mine Void filling on Mus-SR 93-12.92 to 12.94 110410~|~1~|~1~|~01/NHS~|~Rehabilitate structure JEF-7-1185 (SFN 4100484). 124917~|~1~|~1~|~01/NFA~|~Culvert replacement JEF-646-8.13 124917~|~1~|~2~|~02/STR~|~Culvert replacement JEF-152-4.73. 104324~|~1~|~1~|~01/NHS~|~Split for resurfacing work 90815~|~1~|~1~|~01/NFP~|~This is a project for the construction of a mix shed at the Belmont County St. Clairsville outpost. 115425~|~1~|~1~|~01/NHS~|~Construct new interchange at US 23 and SR 762 82442~|~1~|~1~|~01/IMS~|~Fine graded overlay of IR75 in Montgomery County:MOT IR 75 SLM 19.89 to 24.42 82442~|~1~|~3~|~03/IMS~|~Repairing and/or replacing deteriorated sections of median barrier wall. 82442~|~1~|~2~|~02/IMS~|~Patching of Interstate Bridges. 97239~|~1~|~1~|~01/STR~|~BRO US 52 11.51 108258~|~1~|~1~|~01/CMQ~|~upgrading signals and replace pavement markings eligible for federal-aid 108258~|~1~|~2~|~02/MPO~|~Detroit Road Pedestrian improvements eligible for federal-aid 108258~|~1~|~3~|~03/NFP~|~Plan split for 100% local work 109741~|~1~|~1~|~01/S<2~|~Chip Seal 109741~|~1~|~2~|~02/STR~|~Chip Seal 109741~|~1~|~3~|~03/NFA~|~Chip Seal 99865~|~1~|~1~|~01/STR~|~SFN 5401895 - Rebuild left deck edge & seal with epoxy-urethane sealer. Place cover material (rock/stone) over/around footing (rear). Redo piling encasements (remove & replace). Patch pier cap spalling. Rebuild deteriorated wing walls. Place scour protection around pier column encasements.SFN 5401925 - Rebuild deck edges & seal with epoxy-urethane sealer. Place cover material (rock/Stone over/around abut footing. Rebuild wing walls.SFN 5401984 - Rebuild deck edges and seal with epoxy-urethane sealer. Encase rear pier columns. 99865~|~1~|~2~|~02/S<2~|~SFN 7503423 - Abutment patching with Item 519. Investigate epoxy injection of abutment vertical cracks. Seal abutments with epoxy-urethan sealer. Encase pier columns. 99865~|~1~|~3~|~03/NFA~|~Bridge rehab on bridge that is not on the Federal Aid System 116067~|~1~|~1~|~01/STR~|~Resurface with Asphalt Concrete 116067~|~1~|~2~|~02/NFA~|~Resurface with Asphalt Concrete 111668~|~1~|~1~|~01/SAF~|~Safety project that includes pavement marking updates, signal improvements, lighting improvements, sidewalk improvements and accessibility improvements in the City of Athens. Work will take place on State Street and Washington Street. Funded through the TAP Program. 107959~|~1~|~1~|~01/NHS~|~OTT 2 from SLM 16.53 to 23.29 107959~|~1~|~2~|~02/NHS~|~Split for Bridge Work 107959~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 83993~|~2~|~2~|~02/STR~|~General System asphalt resurfacing of COL-39-7.19 to 13.15 and JEF-152-25.86 to 26.38; includes pavement repairs, pavement marking curb ramps as required 83993~|~1~|~1~|~01/S<2~|~General System asphalt resurfacing of COL-39-13.15 to 15.57; includes pavement repairs, pavement marking 13631~|~1~|~1~|~01/BRF~|~Replace two Brdgs on SR763. Project begins 1.25 miles south of SR 353. 0804142 BRO SR763 11.5 Intersect: Trib W Fork Eagle Creek0804177 BRO SR763 11.6 Intersect: Trib W Fork Eagle CreekBoth Structures are eligible for BR funds. Project Description: It is proposed to replace the existing deficient structures on SR763 over the tributary of West Fork Eagle Creek and necessary approach work. 80% Fed/20% State01/BRF/BR/State 119050~|~1~|~2~|~02/IMS~|~All work on bridges classified as being on Interstate routes. 119050~|~1~|~1~|~01/STR~|~All work on bridges included under the STP Rural classification. 108082~|~1~|~1~|~01/STR~|~Plan split is for Pavement Marking Fast Dry 116721~|~1~|~1~|~01/STR~|~Culvert Replacement MEG 689 1.87 CFN:1881039 100753~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 255 0.00-18.08. Not on any federal aid system funded 100 state. 100753~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repairs. MRG 78 18.91-23.70 and NOB 340 0.71-7.01. Rural other federal aid funded 80 federal/20 state. 100753~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG-376-0.00-9.73, MOE-260-4.33-11.32, MRG-555-15.33-22.95, NOB-566-0.00-4.80, WAS-676-12.42-22.06 and NOB 340 7.01-7.08. Urban other federal aid funded 80 federal/20 state. 76793~|~1~|~1~|~01/IMS~|~100% UNFU plan split 111498~|~1~|~1~|~01/STR~|~All work is in this plan split using 100% state funds from SAC 4PS7. 91920~|~1~|~1~|~01/NFP~|~100% 4CP7/Maint. funds for 1 year Guardrail Ding and Dent Repair 98629~|~1~|~1~|~01/STR~|~Underground mine repair 103178~|~1~|~1~|~01/S>2~|~Reconstruction including new street pavement, curb, sidewalk, street lights and catch basins in the City of Dayton. 95405~|~1~|~1~|~01/NHS~|~Properly locate approach slab to slab deck joint and then center polymer modifies expansion joint system on 6 bridges on US 68 in Clark County. SFNs 1203061, 1203096, 1203185, 1203215, 1203304, 1203339. 101997~|~1~|~1~|~01/NFP~|~Installing raised pavement markings along various routes throughout District 4. 116748~|~1~|~1~|~01/IMS~|~Culvert plan split for FRA-71-28.865. 114974~|~1~|~1~|~01/STR~|~All work is in this plan split funded by district allocations using SACs 4PF7 (80%) and 4PS7 (20%). 112807~|~1~|~1~|~01/STR~|~Resurfacing SR 46, SR 170 and SR 154 109686~|~1~|~1~|~01/STR~|~Resurfacing US 62 104300~|~1~|~1~|~01/MPO~|~plan split 120118~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement 115348~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing. 88289~|~1~|~1~|~01/SAE~|~100% federal safe routes to school funding 101422~|~1~|~1~|~01/NHS~|~AC Overlay with repairs - GRE US 35 SLM 0.00 to 1.12 115833~|~1~|~1~|~01/NFP~|~FY 2022 pavement preventive maintenance on various Routes in ATB, MAH and TRU Counties. 76766~|~1~|~1~|~01/IMS~|~100% UNFU funding split 98549~|~1~|~1~|~01/IMS~|~Generic Plan Split for crack sealing interstate routes. Routes to be determined 88735~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill 95660~|~1~|~1~|~01/NHS~|~The project is for the deck replacement of Bridge HAS-250-0780 (SFN 3401650). The existing structure is deficient in Load carrying capacity and the deck will be replaced. 117621~|~1~|~1~|~01/SAF~|~Pavement slip due the CSX railroad cutting an access driveway along the toe of the slope inside ODOT R/W. 124887~|~1~|~1~|~01/NFA~|~Created for J&C Involvement 113741~|~1~|~1~|~01/SAF~|~Plan split for safety related improvements 102566~|~1~|~1~|~01/NFP~|~Facilities special project. SAC LBP7 funds from Central Office. 93159~|~1~|~1~|~01/IMS~|~100% state noise wall funding for design build noise wall on I-27001/IMS/OT/ 101999~|~1~|~1~|~01/NFP~|~2-Year Lighting maintenance and repair along various routes in Ashtabula, Mahoning and Trumbull Counties. 101999~|~1~|~2~|~02/NFP~|~LED luminaire upgrade. 93025~|~1~|~4~|~04/IMS~|~Facilities ADA Funding 4AC7 (100% State) - See CAP Comment - Making ADA related deficiencies repairs/upgrades at the Mus-IR 70-13.90 WB Rest Area Park 20. 93025~|~1~|~3~|~03/IMS~|~Facilities Rest Area Funding 4BR7 (100% State) - No CAP -Resurfacing with repairs of Mus-IR 70 WB Rest Area Park 20. 93025~|~1~|~1~|~01/IMS~|~District Preservation 4PF7 (48% Federal) / 4PS7 (52% State) - No CAP - Resurfacing with related work on Mus-IR 70-13.90 to 21.44 93025~|~1~|~2~|~02/IMS~|~District Preservation 4PF7 (48% Federal) / 4PS7 (52% State) - No CAP - Deck Sealing of 15 bridges along Mus-IR 70-13.22 to 21.44 94075~|~1~|~1~|~01/NHS~|~Slide Repair OH11-02 DSR PIK-009 On SR32, 0.10 mile east of the railroad underpass, it is proposed to repair the slip.01/NHS/OT/State80/20 split using ER funds 01/NHS/OT/State 112431~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 554 10.17 (CFN 1833132) and 12.63 (CFN 1833140). Rural other federal aid funded 80 Federal/20 State. 118682~|~1~|~1~|~01/S50/NEWA~|~Resurfacing of various streets in Newark 90359~|~1~|~1~|~01/STR~|~Drainage System Maintenance/Repair 98144~|~1~|~1~|~01/NHS~|~HNS 80/20 Bridge Deck Overlay Non-BR FRA-33-26.49 L/R over Blacklick Creek 105947~|~1~|~1~|~01/SAE/PCEO~|~Perry County/CEAO HSIP Funding - 4HB7 (100% Federal) - See CAP Comments - Upgrade existing guardrail on various county roads in Perry County. 114489~|~1~|~1~|~01/S>2~|~Split for urban STP paving 110740~|~1~|~1~|~01/MPO~|~Realignment of the Community Park driveway with SR 123 to a 90 degree intersection across from the new Hampton Bennett Early Childhood Center. Construction of a new signal with pedestrian crossing accommodations. 88484~|~1~|~1~|~01/BRF~|~Replace/Rehab Bridge, add sidewalks on SFN 1260928 MCLAMR **C : 0.000 : 0.000 Fountain Avenue at 0.14 MI North of North Street in Springfield. 105905~|~1~|~1~|~01/NHS~|~Plan split for urban paving work 105905~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. 105905~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment 98520~|~1~|~1~|~01/BRO~|~District Preservation Program funds. 122200~|~1~|~1~|~01/NFP~|~All items of work associated with the installation of QWS in Franklin County 113606~|~1~|~1~|~01/IMS~|~Building demo. 79667~|~1~|~1~|~01/IMS~|~Priority system resurfacing of FRA-70: 7.60-11.21 (Wilson to Broad)01/IMS/PV/ 79667~|~1~|~3~|~03/BRO~|~Concrete deck overlay & abutment repair on 1 structure:2504332 FRA CR22 9.1 Intersect: Over Fisher Rd03/BRO/BR/ (BR eligible work) 79667~|~1~|~2~|~02/IMS~|~Minor bridge work (patching, sealing on 5 structures:2504316 FRA IR70 8.93 Intersect: Over Hague Ave2504510 FRA IR70 10.17 Intersect: Over Harper Rd2504529 FRA IR70 10.17 Intersect: Over Harper Rd2504545 FRA IR70 10.63 Intersect: Over Ns Rr2504588 FRA US40 11.21 Intersect: Over Us40 (Broad St)02/IMS/BR/ (not BR eligible)