98133~|~1~|~1~|~01/STR~|~STP Rural Resurfacing 80/20 Fed/State UNI-4-14.16 to 26.25; DEL-4-0.00 to 1.98~|~05 - 4R Maintenance - Resurfacing~|~BB43602A0AF2A5349454CA57B0A867A0CA4F46EA 98133~|~1~|~2~|~02/STR~|~STP Rural deck overlay 100% state UNI-4-25.78 over Ottawa Creek~|~13 - Bridge Rehabilitation~|~C71AE21DB138EDC91F460B5BEC24DAF54FF436A2 116609~|~1~|~1~|~01/STR~|~Crack Seal~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7EE3CB2D3C2EAFBE80FB862DD8E4B25347857772 109767~|~1~|~2~|~02/STR~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~795DCEF9CF406D2A6BF6ECD62584035C54FA8E05 109767~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D5E855C0BF3FA23DC0D0DA51CDE01BA7BE1C5C03 109767~|~1~|~3~|~03/STR~|~full depth repairs on SR 119 through the village~|~05 - 4R Maintenance - Resurfacing~|~B0FDB19E38E674DB432E7A034027DCF54B058220 122990~|~1~|~1~|~01/MPO~|~New sidewalk on Purcell ave~|~28 - Facilities for Pedestrians & Bicycles~|~D1BD744369C96F4CBD1FF82E222A344A602EA89B 81599~|~1~|~1~|~01/S>2~|~Urban Paving - City of Green - SR-619~|~05 - 4R Maintenance - Resurfacing~|~476D8CA3712452087C267E658B5A90E39CF0411D 81599~|~1~|~2~|~02/MPO~|~Urban Paving. MPO is participating in partial and full depth repairs, and ada ramps, sidewalks. Balance from the City of Green.~|~05 - 4R Maintenance - Resurfacing~|~5BA58B3D87057CB8E3FA61E0B51DE2F5CBBE23E8 81599~|~1~|~3~|~03/S>2/GRE~|~100% City of Green requested items. Guardrail, signal, etc.~|~44 - Other~|~78F6A25961D484A8A6954E3B56433830FBCB1A82 81599~|~2~|~4~|~04/BRO~|~Replacement of SFN# 7711166, on SR619-12.04, over the Tuscarawas River.~|~10 - Bridge Replacement~|~BA4EE6A3BED13DEBA13FF94B04C73DAF83B25D3E 81599~|~1~|~5~|~05/S>2/GRE~|~100% City of Green requested items. Guardrail, signal, erosion, etc.~|~44 - Other~|~F87346DD8A338D9AB5F4E0EA826AC18C1779E450 107871~|~1~|~1~|~01/SAF~|~District Wide Signal replacement requiring R/W project. This plan split is for all CLE-125 intersections in the project.~|~21 - Safety~|~22E91A495140061B4241912C09E583D7C0BB64F9 107871~|~1~|~2~|~02/SAF~|~Intersection improvement for the CLE-132 intersection ~|~21 - Safety~|~0B4721F99DF110202D32E7DCF4B703618197DB09 98108~|~1~|~1~|~01/NHS~|~Resurfacing HAS-250 from the Tuscarawas Co. Line to SLM 4.22, including asphalt concrete overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~81B58F6A409FB120B1CAE2345CD1543B9ACF3F40 98108~|~1~|~2~|~02/STR~|~Resurfacing of SR 151 from SLM 0.00 to 4.58 including 1" fine graded polymer overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~A458E008301843EBFFA58D241B05906A4091DC6B 121106~|~1~|~1~|~01/NFA/CANT~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~8D5FF3B089C3492EA5247BED8DCADEFCDC7A9974 117319~|~1~|~1~|~01/NFP~|~Adding for potential J&C involvement~|~44 - Other~|~92E389060AA8891A33B116626A02E812CC746CAE 77254~|~2~|~4~|~04/S>2~|~A new roadway & lighting~|~01 - New Construction~|~728A3DF7A190FE5CEE99FBFC0A101C06C4A71CAA 77254~|~2~|~5~|~05/NFP~|~This is for water and Sanitary~|~43 - Utilities~|~77931DF8C3554ECC4A9C869C6B7B0118382C7A4C 77254~|~1~|~2~|~02/BRO~|~4803574 LUC-75-490R I-75 NB over Ottawa River4803515 LUC-75-490C (ER) Ramp NC-1 over Ottawa RiverSuff Rating < 80 & SD~|~10 - Bridge Replacement~|~9A6CBC2AFCEEE497B538311C754BC873E0AA945F 77254~|~1~|~1~|~01/IMS~|~LUC IR75 3.99-6.7~|~03 - Reconstruction - Added Capacity~|~9F916777B89AAC370EA69D9D776FC4DB09E105EB 77254~|~3~|~6~|~06/S>2~|~Reconstruct about 1.03 mile of roadway and build roundabouts~|~01 - New Construction~|~D614B61DC788917363F910CF90F64864B8F27633 77254~|~1~|~3~|~03/IMS~|~4803396 LUC-75-461 L 4803450 LUC-75-473 L4803671 LUC-75-5124803701 LUC-75-520 L4803728 LUC-75-520 R4803698 LUC-75-520 C4803779 LUC-75-5244803752 LUC-75-5774803787 LUC-75-6314803876 LUC-75-670~|~10 - Bridge Replacement~|~FA2FEF4F8D5ADCEC8CF9DE3CB2EE83E57A16AE89 105665~|~1~|~1~|~01/NHS~|~Culvert WIL-6-4.33~|~10 - Bridge Replacement~|~C4C9CFD4014E441933C12EBBF5F92FB5E3DBD884 121426~|~1~|~1~|~01/STR~|~Plan split for bridges that are STP Rural.~|~47 - Bridge Preventive Maintenance~|~2188516A6F04380F5EE2FEDD440B626844E2D85F 118141~|~1~|~1~|~01/S>2~|~Superstructure replacement for FAI-256-04.98 (SFN 2303094)~|~13 - Bridge Rehabilitation~|~B5835325CC931E21C758D801D1F5F26E980DC77B 101109~|~1~|~1~|~01/NHS~|~Slide at SAN-53 and HEN-old 424.~|~21 - Safety~|~A84E74029A732E8FAE158524D7788AA647C92917 125127~|~1~|~1~|~01/NHS~|~Deck Replacement GAL-35-17.43L~|~13 - Bridge Rehabilitation~|~8D58BC8D42F5510F11B163CF9B9BEFC8E488F844 91007~|~1~|~2~|~02/MPO~|~Park Ave. CR 143 1.66 - 3.17~|~05 - 4R Maintenance - Resurfacing~|~2D5D704A134BA3653A41D3E285C1E98260FAD9A6 91007~|~1~|~1~|~01/MPO~|~Park Ave. CR 143 3.17 - 4.06~|~05 - 4R Maintenance - Resurfacing~|~72945DF8CB32BB533E98B13FB7AAA4B6E5629225 88318~|~1~|~1~|~01/BRO~|~80/20 funding split for bridge work eligible for BRF funds.~|~~|~0B87FA7356832A465B1F74556E8A00241D022C80 92883~|~1~|~2~|~02/S>2~|~District Allocation~|~17 - Construction Engineering~|~5BF5F0BF6AA8406FCB4A7C47E697C2161412DE75 92883~|~1~|~1~|~01/S>2~|~100% City of Brunswick~|~05 - 4R Maintenance - Resurfacing~|~6533D986072A89E53328F6105C1C6F719AD50099 92883~|~1~|~3~|~03/S>2~|~Urban Paving - 80/20 - District Allocation/City of Brunswick~|~05 - 4R Maintenance - Resurfacing~|~71993705E5A1B37F4596E2383EFB1D8F5F0845BD 92883~|~1~|~4~|~04/S>2~|~Bridge Work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8CFC02101361FCA4A2DF34A31E4940792AFED4ED 75497~|~1~|~1~|~01/IMS~|~resurfacing of IR 70 from 23.69 to 26.97; includes pavement, guardrail, pavement marking~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~422E72E1AE19FDE6B10149184E0A331E7E8C4647 92849~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~16055ACDECA8DCDE38E0FF7B6C2F99C584122CEE 92849~|~1~|~2~|~02/BRF~|~100% Local Items~|~10 - Bridge Replacement~|~2AE50F1129819C5E9BD342B6B9ED35D772E60781 92256~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-US 22-01.16 to 09.76 (a Principal Arterial and part of the Enhanced NHS under MAP 21);~|~05 - 4R Maintenance - Resurfacing~|~01713362E24AA6554C8853D630804B7FC7E770F0 92256~|~1~|~5~|~05/NHS/SZAN~|~"05/NHS/PV/SZAN" - 4BG6 OPWC (100% Local) - CAP $194,797.00 / 4BG7 (100% Local) for Curb Removal, Curb Replacement, LSM Backfill, Catch Basin Reconstruction, on Mus-22-(9.19-9.76) in the Village of South Zanesville~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2283A743A93055D821DF52FB104C332643D3C2EA 92256~|~1~|~3~|~03/S<2/ZANE~|~"03/S<2/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving, resurfacing with related work on 1) Mus-SR 719-00.04 to 00.07; 2) Mus-SR 719-00.55 to 00.61;~|~05 - 4R Maintenance - Resurfacing~|~948F02D307D26B2536F5E04685BC899057084E7F 92256~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-US 22-00.00 to 01.16~|~05 - 4R Maintenance - Resurfacing~|~C9D8B653E49CFE6AC59D63CA132A48AF3230DF61 92256~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Mus-SR 719-00.00 to 00.04: 2) Mus-SR 719-00.07 to 00.55:~|~05 - 4R Maintenance - Resurfacing~|~F618EB2EEFB4FF4B1001D3A219DFFD2218E8D5FC 91666~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint funding for 1 year FRA County guardrail ding & dent~|~44 - Other~|~EB40296FB284EEA853104E25D4D3F7745FF05C2F 87242~|~1~|~2~|~02/STR~|~SFN 3601684 - polymer modified asphalt jointSFN 3601714 - Saw and seal joint~|~47 - Bridge Preventive Maintenance~|~FEA54CF74B166147774BE904CEC15420CD46B51F 87242~|~1~|~3~|~03/S<2~|~HIG 73 10.72-10.94~|~05 - 4R Maintenance - Resurfacing~|~13759F26095AA878F70C4291A51F0B9A94732EAB 87242~|~1~|~1~|~01/STR~|~HIG SR73 10.94 - 14.96 Resurfacing ProjectBegin project at Hillsboro corporation limit (SLM 10.27), go south and terminate at (SLM 14.96), it is proposed to resurface the highway with asphalt concrete.80/20 split~|~05 - 4R Maintenance - Resurfacing~|~6BC0A4AE5DF9B478DA733F32AD584F53E049043E 119322~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~BF0906539333A4D872D07D61E4317A5D499CEDB0 123982~|~1~|~1~|~01/SAF~|~Convert signalized intersection into single-lane roundabout.~|~21 - Safety~|~25F8325E5B922E421F1CC3E64800A011AF22F8B2 110276~|~1~|~1~|~01/MPO~|~Peck-Wadsworth Bridge Replacement~|~10 - Bridge Replacement~|~AB3666715742CEDCA65CB8C64D3E354AE210A0F9 100876~|~1~|~1~|~01/STR~|~Resurfacing on all non-NHS routes (38,40,42).~|~05 - 4R Maintenance - Resurfacing~|~889AF4F12337BCBF9CFD5B81AE07124E659807DD 117262~|~1~|~1~|~01/STR~|~Plan split for signs~|~21 - Safety~|~47DDA62250164FA9451F512E3EFE1AA57AE4F338 120663~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~08 - Bridge - New Construction~|~E6B2DB8B380B74E6FB00E1C9099141596AF00AFE 122412~|~1~|~1~|~01/S5K/CAMB~|~Rehabilitate Edgeworth Avenue, 8th Street Road and Wills Creek Valley Drive in Guernsey County. Small City Funding - SAC 4B97 95% (which includes 15% Toll Revenue Credit) / LNTP 5% Local Match capped at $1,600,000 for the Construction Phase. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~28908C23A67BA8338A89712C3231CD276F878696 89468~|~1~|~1~|~01/ENH~|~"01/ENH/OT/COL" - Lisbon. at county fairgrounds - Renovate, repair, paint and relocated historic bowstring arch truss bridge and construct pedestrian approaches at each end. Once completed, this project will provide improved pedestrian access from the parking and camping areas to the fairgrounds.~|~32 - Historic Preservation~|~41843647D9FB3548A8FE90B67955A890787486D6 100195~|~1~|~1~|~01/NHS~|~Urban Pav 3 routes.~|~05 - 4R Maintenance - Resurfacing~|~54D0DE4BC101A5A0433C9BC87AE65CF0E21FC77D 100195~|~1~|~2~|~02/NFP~|~Non eligible urban paving items.~|~05 - 4R Maintenance - Resurfacing~|~43FC238109E0B781071B147E5FEABDDC1AECDA7C 90888~|~1~|~1~|~01/MPO~|~80% Federal MPO STP / 20% Local funding split for the resurfacing of Rockside Road.~|~05 - 4R Maintenance - Resurfacing~|~EB08E23E790B14465F54546F0A040F57FBC84263 92331~|~1~|~1~|~01/BRO~|~4800303 LUC SR2 18.62 Intersect: Maumee River,Rrs&Streets~|~13 - Bridge Rehabilitation~|~2F86A95C4ECF1CC0B21EBED68C0B48939364CA9C 92331~|~1~|~2~|~02/BRO~|~This split is for design consultant on-going services~|~17 - Construction Engineering~|~150941F2EE77AFEB4E2C085CEB82D9B34DAB55AE 92331~|~2~|~3~|~03/BRO~|~This split is for consultant conducting bridge painting inspection.~|~17 - Construction Engineering~|~10E7659C8171B0BA0F9EF158BC9E1439C2DD2945 116401~|~1~|~2~|~02/NHS~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~6CD26365D8D281286C7A16DE7D1022448C609FC9 116401~|~1~|~3~|~03/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~EE7686F47EE5FD6BFE7257F500584A44B91A9CCD 116401~|~1~|~1~|~01/IMS~|~Culvert repairs.~|~04 - Reconstruction - No Added Capacity~|~D81F9E3B0A6131E4520EAABE3D737948850D0D02 123424~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~028B47FED443E161C140200823B58F9ABA0A7BBF 100350~|~1~|~1~|~01/STR~|~Microsurface SR 65 within Auglaize County AUG SR 65 0.00 - 5.27 AUG SR 65 7.32 - 13.36~|~05 - 4R Maintenance - Resurfacing~|~1CC07730D07178B10AE359C41FA61E93E795555C 124834~|~1~|~1~|~01/BRF~|~Single span box beam super replacement~|~13 - Bridge Rehabilitation~|~1D323DB6BFC9BBFFA5AC8F6A8E9C8B10ED51234F 88803~|~1~|~2~|~02/S<2~|~CRA-19-16.07 to 16.37~|~05 - 4R Maintenance - Resurfacing~|~6CB0E5E6A8D4EE18ED25743FEE61D452624AFB7A 88803~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys CRA-19-16.37 to 28.28~|~05 - 4R Maintenance - Resurfacing~|~719D7DD628EC69BD31BA3E5DE6721346F0D366B3 101356~|~1~|~1~|~01/S<2~|~District AllocationFederal/State:Urbanized Area Outside Corp. Limit(Paving Items Etc?):CRA-SR-0004 ? SLM 06.72 to 06.94 (RT)~|~05 - 4R Maintenance - Resurfacing~|~7FE6A0F195195560CF689E25FCE6C0ABA536706F 101356~|~1~|~2~|~02/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items):CRA-SR-0004 ? SLM 06.94 to 08.45CRA-SR-0004 ? SLM 06.72 to 06.94 (LT)~|~05 - 4R Maintenance - Resurfacing~|~7229F7AA32B369DF7492FE0B725F8A3CD649561D 101356~|~1~|~3~|~03/S<2~|~100% Local (Bucyrus): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.):CRA-SR-0004 ? SLM 06.94 to 08.45CRA-SR-0004 ? SLM 06.72 to 06.94 (LT)~|~05 - 4R Maintenance - Resurfacing~|~50C1C966DDA1B64CE566BACD3241CE0244DA5A5D 117676~|~1~|~1~|~01/MPO~|~Primary Plan Split for MPO STBG funding.~|~04 - Reconstruction - No Added Capacity~|~9BBBC8611DF1FF9A93B12A1680126C4C78D56064 117676~|~1~|~2~|~02/NFP~|~100% Locally funded plan split.~|~17 - Construction Engineering~|~1A96DFD03856B89DE42DDBF9E86817D6A8E6268E 115006~|~1~|~1~|~01/MPO/BEAV~|~Widening of Dayton-Xenia Road from Meadow Bridge to Darlington Drive. Addition of curb and gutter and storm sewer, and sidewalks on both sides of the roadway.~|~21 - Safety~|~2C1C11F80449D4C83C8BCA51EB8B5CB17C67CB9F 122716~|~1~|~1~|~01/S>2~|~Funding split for MPO STBG funds.~|~05 - 4R Maintenance - Resurfacing~|~571115CA80E16A628F32E66D4691C3E39197A5B8 123971~|~1~|~1~|~01/S50~|~Resurfacing along CR 22A from Wintersville's west corp. limit to Harmony Drive - 80% (4TA7/BH11) Federal funds/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~2E365670AC713CF83CADF5B09A7E3016435134D2 113890~|~1~|~3~|~03/STR~|~Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~3929F7CC89910BEE2565B0AD6BD58C9FBE3F2C94 113890~|~1~|~1~|~01/S5K~|~Edge Reconstruction HUR SR 99 01.72 - 4.49Edge Reconstruction HUR SR 99 12.78-14.90Overlay only HUR SR 99 14.90-15.00~|~04 - Reconstruction - No Added Capacity~|~DE4756BA7611BDB23F76E457CB19E81CCFCD521B 113890~|~1~|~2~|~02/STR~|~Edge Reconstruction HUR SR 99 4.49 TO 12.78~|~04 - Reconstruction - No Added Capacity~|~DAC31414FA677008B9DACDA09810CFBAC919036D 111873~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation on Friendsville Rd~|~13 - Bridge Rehabilitation~|~A7465782BE40EAEBED57BACA9AA030AF29CCA15E 84438~|~1~|~1~|~01/BRO~|~3602370 HIG SR134 6.01 Intersect: North Fork White Oak CrkBR Eligible 80 fed/20 state 01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~F8729CE22C049101DE5DD62B5FEA1B5FBBE23A02 114776~|~2~|~1~|~01/S>2~|~conduits linked~|~~|~343DEA8AC32DA9BD121BCCA1812D8FC9A9A0B5E6 114776~|~1~|~2~|~02/NHS~|~conduit linked~|~~|~B6D2AF0CC67EFC7BAD6635AC1B882E85A42DADD7 112915~|~1~|~1~|~01/STR~|~PIK 104 0.00-6.52 & SCI 104 17.43-17.70~|~05 - 4R Maintenance - Resurfacing~|~B5977E9534CC75FBCF71BBFBC4C4107B7F857CDF 112915~|~1~|~3~|~03/SAF~|~Center lined rumble stripes.~|~21 - Safety~|~4C7227150870BD90E2E4A02034029E6AA1902184 112915~|~1~|~2~|~02/STR~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~F6DCF7235399AF898BDEA9FCC6C8369BBB9597D7 112915~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~639BA4540E4AC7B96F8FF8E160CA6499F6866DE5 112146~|~1~|~1~|~01/BRO~|~LBR funded items plan split~|~10 - Bridge Replacement~|~4EEFB836E2A2A5F3EF8046F79438D1DDC59E2712 97451~|~1~|~2~|~02/NHS~|~FY2018 Urban Paving Project in the City of Lebanon. This plan split is for SR 48T where the pay items are 100% City.~|~05 - 4R Maintenance - Resurfacing~|~253E1EF650D854A6D8437207D0CEF8F9120B04AB 97451~|~1~|~1~|~01/NHS~|~FY2018 Urban Paving Project in the City of Lebanon. This plan split is for SR 48T where the pay items are split 80% State and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~7DFB935A19968C1612820B102947828F8D3B18F3 100775~|~1~|~1~|~01/STR~|~Spot paving on various sections of SR 41 in Fayette and Madison counties.~|~05 - 4R Maintenance - Resurfacing~|~141E6008A52FADF1E96596ACB60EBDEF9CBF96EE 109575~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~1FF682CC26E552547D81E19C16B5E59616E36891 112907~|~1~|~1~|~01/S<2~|~PIC-56 from 20.66 to 22.02~|~05 - 4R Maintenance - Resurfacing~|~BD18CF2D8D574D31271C8D669CFE98C277BA56F6 112907~|~1~|~2~|~02/STR~|~PIC-56 from 22.02 to 33.93~|~05 - 4R Maintenance - Resurfacing~|~CCB363D1EE4235870C707124958260F06DFC2874 107658~|~1~|~1~|~01/STR~|~Resurfacing on SR 235 using district preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~6DB78F12093CA2B711DFA4EBBB0DD2B108A53615 86871~|~1~|~2~|~02/IMS~|~Added funding event for On-going services to be provided by Consultant during construction of the project.~|~17 - Construction Engineering~|~A80584A893A165887CF9607E56160CB5DA34DB27 86871~|~1~|~1~|~01/IMS~|~Replace existing multi-span bridges (BEL-70-0442 L & R, SFN 0701920, 0701955) with a single span structure. Also remove multi span twin bridges (BEL-70-0475 L & R, SFN 0702013, 0702102) and replace with embankment.~|~13 - Bridge Rehabilitation~|~D7D151CFF4E8CADF801451BA253FA9F55C31CF85 91991~|~1~|~1~|~01/S<2~|~PIK 551 (0.00 2.87)~|~05 - 4R Maintenance - Resurfacing~|~00BEEB751B999463F920E2BA6675FD3206069F46 91991~|~1~|~2~|~02/S<2~|~PIK 551 (0.00-2.87)~|~13 - Bridge Rehabilitation~|~7B07C4F4A7CF296AAF33D5B4DFF274F3CB8BB6A3 106324~|~1~|~1~|~01/MPO~|~Installation of ADA compliant curb ramps at a number of existing pedestrian crossings in the Village of Yellow Springs.~|~28 - Facilities for Pedestrians & Bicycles~|~8A0857F532D0273D92EE06FC9E279B6DC0EBCF9E 103168~|~1~|~1~|~01/NFP~|~Paving of park driveway and parking lot.~|~44 - Other~|~BA250E6DEF89590BEC0DD9C003E85C90E92FD9FE 89123~|~1~|~1~|~01/STR~|~Rehabilitate and resurface existing roadway on AUG CR 33A from 0.00 to 7.90.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F25406230E10E47467546A90728858137DE10587 111832~|~1~|~1~|~01/NFA~|~Replace Knollwood Road Bridge #246 over Chapman's Creek and modify the roadway approaches as needed.~|~10 - Bridge Replacement~|~9DE43A8345C765F89BB9D8D6464626346A17B848 114976~|~1~|~1~|~01/STR~|~This split is for the sections outside of the Findlay Urban area. Funding is from district allocations using SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~BA6424F6864692D45D49E64B63A4DFA5F841385B 125474~|~1~|~1~|~01/MPO~|~Plan Split 1 created for STBG eligible items on FAS. 80% OKI STBG, 20% LNTP~|~21 - Safety~|~1D7353CF1D5527E423181C6D51566DFF19D44FF8 105281~|~1~|~1~|~01/NHS~|~Resurfacing US-22~|~05 - 4R Maintenance - Resurfacing~|~1E33B632060AE1FB3535BB4339902D3FAFC228F7 105281~|~1~|~2~|~02/NHS~|~Bridge deck sealing with HMWM~|~47 - Bridge Preventive Maintenance~|~8BFA33DAE9DE069216AE9DAA568BBDA10D69BA99 100683~|~1~|~1~|~01/NHS~|~Mico-milling.~|~44 - Other~|~F7817BADF67B57BB6098A5B87394007FE3794547 101746~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing, safety countermeasures and ADA compliance work. WAS 60 1.32-1.48. Funding 80% Federal WWW-MPO and 20% Local.~|~05 - 4R Maintenance - Resurfacing~|~24F5AE3876B8FB95B8CEDB16BF8687B2073EB6D4 101746~|~1~|~2~|~02/NHS~|~Add items and work elements for different Ped heads and foundations on project requested by the City of Marietta. 100% Local funds.~|~28 - Facilities for Pedestrians & Bicycles~|~5C87E5A1B644D892BB45AC30663F76F662F970DC 86938~|~1~|~4~|~04/S>2/NFRA~|~100% City Funded Items~|~05 - 4R Maintenance - Resurfacing~|~36BD0CB2016880957F5075A3634F975911D32055 86938~|~1~|~1~|~01/S>2~|~Resurfacing of SUM SR-93 SLM 5.52 to SLM 5.98, and SUM SR-619 from SLM 3.18 to SLM 3.85, in Coventry Township, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~4BDDC13B62D58D2098D8C9B9C6E18E3E503ADEE4 86938~|~1~|~2~|~02/S>2/NFRA~|~80/20 Resurfacing costs for SR-93 from SLM 0.00 to SLM 5.52 and SR-619 from SLM 3.85 to SLM 4.87 in the City of New Franklin, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~907FC48F5BE710D0A22E938957497546B67D17B0 86938~|~1~|~3~|~03/S>2~|~Bridge rehabilitation of SFN 7707479, SUM-93-0.38 over Nimisila Creek, SFN 7707509, SUM-93-7.85 over Tuscarawas River, SFN 7707533, SUM-93-7.96 over Canal Feeder, SFN 7707568, SUM SR-93-8.00 over Ohio Canal.~|~13 - Bridge Rehabilitation~|~AE01D5D806915B87F22972F387DFB207F6149D93 11337~|~1~|~1~|~01/BRO~|~Bridge Costs - Old Project~|~13 - Bridge Rehabilitation~|~AC6746114BEFFE2121F469824E857AF5AA916189 119619~|~1~|~1~|~01/S>2/KY~|~Repair Clay Wade Bailey Bridge~|~47 - Bridge Preventive Maintenance~|~7EC811A60D906BBD7D122EDFBB237C912677DF57 126363~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~96104BF4B54EFCF1021908CE935564CD55EFAC56 87254~|~1~|~3~|~03/STR~|~HIG SR124 0.00 - 8.78 Resurfacing ProjectBrdg for rehab:3601889 HIG SR124 1.87 Intersect: Turtle Creek80/20 split~|~13 - Bridge Rehabilitation~|~0C11040E9CCF18FC8088DA82067415C9953F0CCD 87254~|~1~|~2~|~02/S<2~|~HIG SR124 0.00 - 8.78 Resurfacing ProjectSLM 8.03 - 8.78 of urbanized area.Urban Paving eligible portion is paid for by State under the urbanized area plan split; no local match required due to small portion.Begin at Clinton County line and terminate at the Hillsboro corp limit. 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~681E9574152917E62C31FED6CF7F026563F0F92C 87254~|~1~|~1~|~01/STR~|~HIG SR124 0.00 - 8.78 Resurfacing ProjectSLM 0.00 - 8.03 Rural Begin at Clinton County line and terminate at the Hillsboro corp limit. Pave Thru Brdgs:3601870 HIG SR124 0.89 Intersect: Trib Of Turtle Creek3601900 HIG SR124 3.92 Intersect: Stream80/20 split~|~05 - 4R Maintenance - Resurfacing~|~A11D1CE0917337B5B285244D12279E3AA4A8244F 101163~|~1~|~1~|~01/NHS~|~All work associated with SAN-20-0911 bridge replacement~|~04 - Reconstruction - No Added Capacity~|~9C727151C4EAF1DD65DB803F12827BDEC0C131C8 109017~|~1~|~1~|~01/ENH~|~Bike/Ped route through Lisbon and new trail along SR 154 at 95% TAP/5% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~36DB8BD4B5A45E44E9814B1BEB90CC432D251312 109017~|~1~|~2~|~02/NFA~|~Park and Ride upgrades~|~28 - Facilities for Pedestrians & Bicycles~|~C095ECFF2D6734BC3293713C45DB99B7F0D6A5A5 120065~|~1~|~1~|~01/NFA~|~NEVI Round 2 270-C~|~63 - Electric Vehicles & Charging Infrastructure~|~9B3D284983CFB5211D87ED2C40A7BDF6AB7D4A54 84516~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. MRG 60 0.00-9.36. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~BC7DC0F264C95F83AC440D885BC8643459B94F40 84516~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. WAS 60 3.60-5.18. Funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~9029C5D03AA8CA30ED4F6C3F68E25DE9C193B212 112600~|~1~|~1~|~01/CMQ~|~Split 1 for work using CMAQ funds.~|~44 - Other~|~2F34DA4472DC89A347C412BDA1ECCE65251EE813 112600~|~1~|~2~|~02/NFP~|~Work in the project that is 100% local cost.~|~44 - Other~|~6787BA6F5BE4F2EA7C7953331289F1E95A08290D 88341~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~87404D03364F13804921F38CE3E63ECBC32C3DDC 115435~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~EA73EAFA03A399E7BA3B7E0E988D370019A11C89 101152~|~1~|~1~|~01/SAF~|~FUL-20A locations~|~44 - Other~|~3553CDA89D80E93D90DCDAA9654E09D0A8B9B43C 101152~|~1~|~2~|~02/SAF~|~Luc SR 2 and Wil US 20A - NHS Locations~|~44 - Other~|~1441220BEC4A71C5F682E7ED301151E67805CB5C 101392~|~1~|~1~|~01/S<2~|~Resurfacing FRA-62-0.00 to 1.30. General system within the Darbydale Urban Area~|~05 - 4R Maintenance - Resurfacing~|~8C5CF5B6E822C0B65A1BF86BB8B1F7BBB5F630E9 101392~|~1~|~2~|~02/STR~|~Resurfacing FRA-62-2.97 to 3.85. General system~|~05 - 4R Maintenance - Resurfacing~|~8938FFECC270C15DED3ED2781B1928EF3EA57FDE 101392~|~1~|~3~|~03/NHS~|~Resurfacing FRA-62-3.85 to 5>63. NHS system within the Columbus Urban Area~|~05 - 4R Maintenance - Resurfacing~|~E096E0F0C7B13F0A24D3166D44C955B0B28F4293 122461~|~1~|~1~|~01/ENH~|~Federal items.~|~28 - Facilities for Pedestrians & Bicycles~|~9A2A115DCEF46B46DCA8E2A39FA065905C5846C3 127013~|~1~|~1~|~01/STR~|~Pedestrian crossing enhancements~|~28 - Facilities for Pedestrians & Bicycles~|~6C3088A8CEE4D2CBFD75E8987CD5096E79C5D08B 101545~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 10.69. DSR ATH-004.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3CFD8A9C3407B1B215E36F268CA003EAD212C559 116090~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - No Cap - 100% state funded project (4PS7) - removal of retired structure.~|~40 - Special Bridge~|~19B165C69C51CD1B6C83641C1E79E1C07D2E6DEB 119999~|~1~|~1~|~01/ENH~|~Installation of a sidewalk or multi-modal facilities to provide 4700' of connectivity from the Athens corp limit to the Columbus Road intersection with the Hockhocking Adena bikeway. Funded 90% Federal/10% Local.~|~21 - Safety~|~99585BCDFFC2FE58B345DDB116102B4AC90C4B0F 90798~|~1~|~1~|~01/MPO~|~Remove and replace existing concrete median with type 6 barrier curb and brick pavers. Replace existing grass tree lawn between existing sidewalk and curb with concrete. Alter or reconstruct existing ADA ramps to current standards. Remove existing asphalt, apply interlayer sealer and 2" of new asphalt. Installation of thermoplastic pavement markings and replacement of traffic signal loops on Main Street from SR 741 to the North Corporation Limits.~|~31 - Landscaping & Other Scenic Beautification~|~336383ACC39F6FE97C9F611DF23401BB9133A0DF 105387~|~1~|~1~|~01/STR~|~Smooth seal rural route: CHP SR 54 SLM 0.00 to 1.70~|~05 - 4R Maintenance - Resurfacing~|~C5C266A8E175C3EC9D8E3E9518BE98C016DE436C 93007~|~1~|~1~|~01/STR~|~Replace deteriorated 4 sided box culvert with new 4 sided box culvert with minimal asphalt approach work on SFN 1903195 DAR 503 0140 branch of Millers Fork.~|~13 - Bridge Rehabilitation~|~127D0C75BD525A26ACC26805AC2F802892D370D4 124376~|~1~|~1~|~01/S5K/LANC~|~Resurfacing and related roadway work on CR 33 (Memorial Drive) in the City of Lancaster.~|~05 - 4R Maintenance - Resurfacing~|~5D13C435BD8BD596C39A83FAADD80750196B1417 120498~|~1~|~1~|~01/NFA~|~Resurface Campground area~|~05 - 4R Maintenance - Resurfacing~|~609467730450BD51CD8C0916E501A877220DC5B0 97097~|~1~|~1~|~01/NHS~|~Reconstruct the traffic signal installation at the US 250 and northbound IR 77 ramp intersection include replacing the highway lighting at this intersection along with the guardrail. Upgrade the southbound IR 77 ramp, CR 102 and US 250 intersection. This includes but not limited to new traffic signals, guardrail, pavement widening, new signing, and new highway intersection lighting.~|~21 - Safety~|~BD26C9138CB29C2EAE0292FDB2700CB28844EC05 120496~|~1~|~1~|~01/NFP~|~Created Plan Split for J&C involvement~|~44 - Other~|~729FF108E6EA145FDD52E2A581091836F593912B 123520~|~1~|~1~|~01/STR~|~GSM rock slope repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2F00D767EF30DD2E3E557517F8360DBEB906CB3D 113784~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 559 0025, SFN 8432074.~|~10 - Bridge Replacement~|~04E5E9C47F29729A7D1E5A26B9C682D5CF3A6F51 109262~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE CR 28 0.56, SFN 5632501. Funded 100% Federal.~|~10 - Bridge Replacement~|~9C8FDC6A21589474540184D9E9A59849C132A228 109062~|~1~|~1~|~01/STR~|~Rehab. Warrensburg Bridge over Scioto River~|~13 - Bridge Rehabilitation~|~9E5A2AA9F64F6BC941546712DBCF857CCCB28D94 124972~|~1~|~1~|~01/STR~|~Plan split for chip seal treatment on STP Rural roadway~|~05 - 4R Maintenance - Resurfacing~|~7922455B5D50604D5761F0B605C5F3C110833953 93133~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004058 GUE SR209 8.56 Intersect: Over Wills Creek & CSX RR; Not BR Eligible for Rehabilitation: Length=484 SD/FO(0) SR=60.8 DSR=5~|~~|~36F99C18719EBCF2272F9542BFB146787EEE20A2 93133~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004112 GUE SR209 9.84 Intersect: Over Wills Creek; BR Eligible for Rehabilitation: Length=172 SD/FO(1) SR=94.1 DSR=4~|~~|~3EC789E1FA9B6F83AA241930978C57002FC81D07 116636~|~1~|~1~|~01/NFP~|~Sign Replacement.~|~21 - Safety~|~F4B0AEAF0B8EF3E7390E46D669CBDE72A5531205 108471~|~1~|~1~|~01/NHS~|~Split for work on the NHS~|~04 - Reconstruction - No Added Capacity~|~D34F93254AB7EB5F96B78A8AF4534C805E7EE728 108471~|~1~|~2~|~02/STR~|~Split for work on the rural STP system~|~04 - Reconstruction - No Added Capacity~|~7B2FA6669222B1B3E06B30DF7106083B2333E604 108471~|~1~|~3~|~03/S>2~|~Split for work on the urban STP system~|~04 - Reconstruction - No Added Capacity~|~98F3A3F037D9FC0B26CF9B3861D35E5CBECBBFA5 124930~|~1~|~1~|~01/S5K~|~Reconstruction of W. 4th Street in the City of London from N. Oak St to N. Main St including sidewalks and new drainage facilities.~|~04 - Reconstruction - No Added Capacity~|~7B82302C6BFF3D587F0EDF057ECD56878D801800 87043~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2015. Various Routes and Sections in D-10. 100% State.~|~21 - Safety~|~AB056B259A98DD982490CF6AE75286438ACC5C60 126518~|~1~|~1~|~01/SAE~|~All work included in this plan split.~|~21 - Safety~|~DE4BD23D435605526407176C754B1D0277D71BBA 77040~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds.~|~13 - Bridge Rehabilitation~|~B6663C175C7907C59FC1D8A0CDE5B227735492A4 119128~|~1~|~1~|~01/STR~|~All items of work associated with District wide chip seal.~|~05 - 4R Maintenance - Resurfacing~|~7F860A10B3476F06A96CC54C646D35FC40EA4CD4 110842~|~1~|~1~|~01/NHS~|~Repair culvert, embankment and pavement at slip on PIC US23~|~04 - Reconstruction - No Added Capacity~|~DC05C5F739CA989D4209C9FB22DF7BAD0D5D8C35 126177~|~1~|~1~|~01/MPO/NFRA~|~Construction of a roundabout at the intersection of SR 619 and S Turkeyfoot Lake Rd. Includes shared use paths.~|~21 - Safety~|~3E58114D88E61CC7CFC8F9ADA92308E66ADD7EC5 126177~|~2~|~2~|~02/MPO/NFRA~|~Resurfacing S Turkeyfoot Lake Road north of the roundabout.~|~05 - 4R Maintenance - Resurfacing~|~713AC2C71CF63C431FFC13D878E8788F1AD57184 114676~|~1~|~1~|~01/IMS~|~Project to Pave inverts of bridge size culverts and perform other related repairs Including WAR-75-0411E, and WAR-75-081~|~13 - Bridge Rehabilitation~|~FA82F63C05A873551631DF7FA74CA16F08D030A6 114676~|~1~|~2~|~02/STR~|~WAR-123-1295 and WAR-123-1328~|~04 - Reconstruction - No Added Capacity~|~AC319DCC5A96C922B5C090D6F53E2E73C8CED87B 114676~|~1~|~3~|~03/STR~|~WAR-741-1172~|~13 - Bridge Rehabilitation~|~024669A5156850497BF91709EC9B6DC75AFF0CC6 86482~|~1~|~1~|~01/NHS~|~Pavement work using several fund sources:o TRAC funding (80% federal / 20% state) capped @ $16.6Mo Major Rehab funding (80% federal / 20% state) - work will also include the construction of multi-purpose path.~|~04 - Reconstruction - No Added Capacity~|~812BE5531BE5F379CFAB0C6EE2E61112B7A6E88E 86482~|~1~|~5~|~05/SAF~|~Added new split for Safety portion from PID 86480~|~21 - Safety~|~85808465D6851FDF61C8DBD19F9D656058760B2A 86482~|~1~|~2~|~02/NHS~|~Bridge work (rehab/retrofit) for the improvement utilizing district preservation funds (80% federal / 20% state).~|~13 - Bridge Rehabilitation~|~B758C83809549A99ABA28DA5B2678E7B832E9890 86482~|~1~|~4~|~04/NFP~|~100% City participation for items not eligible for any other funding.~|~44 - Other~|~BD08E40143187E464D645F144FAE1B87692DD63C 86482~|~1~|~3~|~03/NFA~|~Work items @ 100% local participation.~|~44 - Other~|~DDB0BE54961FB613184BE7B51F842402B37C1E9E 86482~|~1~|~6~|~06/S>2~|~Items there damaged due to traffic that are not eligible for federal-aid.~|~04 - Reconstruction - No Added Capacity~|~7AC23B5AD38E92FF7BB228D1540E8F1D05CA0302 89429~|~1~|~1~|~01/STR~|~District Wide RPM project~|~21 - Safety~|~56EA42223778D20983BCCDEA4C0D898493918C8E 89421~|~1~|~1~|~01/MPO~|~road wideining and resurfacing SLM 0.638 (Red Coach) to 1.192 (Derr Road)~|~04 - Reconstruction - No Added Capacity~|~D6D8E1D49EA077F8209F2FC4DFB788A7B8EA98B0 89421~|~1~|~2~|~02/MPO~|~resurfacing and traffic signal work SLM 0.00 (SR72) to 0.638 (at Red Coach Drive)~|~04 - Reconstruction - No Added Capacity~|~7CC954A198EA0945C738B90420864E3CFA3266C4 107225~|~1~|~2~|~02/SAF~|~Pavement marking project on various routes and sections in Gallia County for FY2021. CEAO funded. Funded 100% federal.~|~21 - Safety~|~3CA4C2789BAA8020B3B88CEB250A3D67A6657A40 107225~|~1~|~1~|~01/SAF~|~Wet reflective pavement marking funded through the Safety program. Locations include Addison Pike, CR1, 0.00 to 4.74/Bulaville Pike, CR3, 0.00 to 10.58/McCormick Road, CR 6, 0.00 to 1.84.~|~21 - Safety~|~19C72D7D98F299B796FDC56DA385D88047E71BF2 109680~|~1~|~1~|~01/STR~|~Resurfacing SR 800~|~05 - 4R Maintenance - Resurfacing~|~15107BC01875DF169D0C147790404A6E61400E98 114616~|~1~|~1~|~01/NFP~|~Plan split for Bridge elec. maintenance~|~44 - Other~|~AB8C0D51AD6515FA71CB3069B201208DBF44F82D 87200~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~7177117148605469C624590748DA76792BC51EEF 120806~|~1~|~1~|~01/ENH~|~Shared use path utilizing Federal TAP and Safety funds up to Federal maximum. ~|~28 - Facilities for Pedestrians & Bicycles~|~31F971DE9BFC1086A30180C0782D2C44DC4DAFD9 96107~|~1~|~1~|~01/NFP~|~Salt Shed Doors~|~44 - Other~|~700A89A0EEA6AB958FF5C0D8CFD340B19B6A7260 115541~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County CEAO Federal/State Exchange Program Funding - 4C87 (95% State) / LNTP (5% Local Match) - Replacement of SFN 6030688 carrying Rayner Lane over Meigs Creek~|~10 - Bridge Replacement~|~A2577420FD752E25BDB2815CA7EC23FFDADE0A48 118726~|~1~|~1~|~01/NFP~|~added plan split.~|~~|~B412599F99BCBBF3E0CAD82D1451952F6EA8F562 103170~|~1~|~1~|~01/NHS~|~Reconstruction to include sidewalks, trees, etc in the City of Dayton.~|~04 - Reconstruction - No Added Capacity~|~D3029D10BFF55F0E46F0837D8C9763543A735237 95997~|~1~|~1~|~01/NHS~|~SFN 8600635 and 8600694~|~10 - Bridge Replacement~|~2F6837464A0FFB2DE7ECBFA58F0B33C5DD3728EA 95997~|~1~|~2~|~02/NHS~|~WIL 6: about half mile west of bridge @ 20.46; roadway segment between the bridges (1.27 mile); and about half a mile east of bridge @ 21.73.~|~05 - 4R Maintenance - Resurfacing~|~F6EC58E20E0C55BB32D07FC0EC6509A47672EB4A 119447~|~1~|~1~|~01/IMS~|~Split for ramp slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~258A54E3F26735BB699C447440CADBAC0C069DD2 123912~|~1~|~1~|~01/MPO~|~Resurfacing Dayton-Xenia Road from I-675 to East Lynn Drive and Grange Hall Road from the Creekside Trail to Southview Street.~|~05 - 4R Maintenance - Resurfacing~|~3D1AB7BE8E3915C15C62478BD7AC07F0A75379B1 102441~|~1~|~1~|~01/NHS~|~Culvert replacement ADA 32 23.22 (CFN 1849052)~|~04 - Reconstruction - No Added Capacity~|~8AA3DCFC847C468BFAFA4637737FB2EA24F922D3 108942~|~1~|~1~|~01/NFP~|~Intersection improvements on 4 intersections in Wellsville~|~44 - Other~|~3A8DCE2FD3DC4942E0C62786EED9C372CBB574CB 110413~|~1~|~1~|~01/NHS~|~FY23 Urban Paving on US 50 in the City of Cincinnati. This plan split for the 80/20 items between ODOT and the CIty.~|~05 - 4R Maintenance - Resurfacing~|~E0804FD88F9C1E3DF3C4CDD8079BB911F55C8DED 110413~|~1~|~2~|~02/NHS/CINC~|~This plan split is for items to be paid 100% by the City.~|~05 - 4R Maintenance - Resurfacing~|~8D47CF1F1B0547E8EBE59F11B56EF9FCF63F045C 101247~|~1~|~1~|~01/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail replacement on the NHS System~|~21 - Safety~|~D377640D5C763022277A5903CF313A8F57A0E015 110719~|~1~|~1~|~01/IMS~|~Using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~D71CC42CE30A7F5587C665F1E1B54D3223AD2EA6 94077~|~1~|~2~|~02/NHS~|~See linked structure.~|~13 - Bridge Rehabilitation~|~3E806C751263F89008859DF8B23A02031E1C521A 94077~|~1~|~1~|~01/NHS/CONN~|~Resurfacing of ATB-US20 from SLM 25.99 to SLM 27.68, in the City of Conneaut, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~E0EA89C279C8770B4FFFA55C924A5D774DD3773C 94077~|~1~|~3~|~03/NHS/CONN~|~100% City of Conneaut items.~|~05 - 4R Maintenance - Resurfacing~|~1C20C8AF3EE83B4700809CB0B6EC6B4FE7485770 91932~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maint. Funds for Mowing 2 years contract~|~21 - Safety~|~142C5EA9D47DD17EAD9006360E1494A36D746A7F 99198~|~1~|~1~|~01/STR~|~JAC CR 76 0.00-6.68~|~05 - 4R Maintenance - Resurfacing~|~284FF47AC2FFE0528CE6652BE77C05129A410625 99198~|~1~|~2~|~02/S<2~|~JAC CR 76 6.68-8.82~|~05 - 4R Maintenance - Resurfacing~|~CD7BF98E3766ADEDD271908F6C5A583D48E689F9 126353~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~~|~E55429AB85B1C49744AF92C277839A4C2952CBE2 97221~|~1~|~2~|~02/SAE~|~Signal improvements along NHS Non-Interstate routes: SR-2 @East 305th St, US-20 @SR-306 US-20 @Acacia Ave/Hart St, SR306 @Tyler Blvd.~|~21 - Safety~|~1AAA9E8C8DF9EE0E985A709768D41B1FB08C6BD7 97221~|~1~|~1~|~01/NFP~|~District-wide signal repair/maintenance work~|~44 - Other~|~1D916B6073B1B816FC0CEDDC3C6DB3902C017561 124330~|~1~|~1~|~01/SAF~|~Plan Split for Carbon Reduction / Safety funding for pedestrian improvements ~|~28 - Facilities for Pedestrians & Bicycles~|~08039EBDE15B29E056F1C83CA979E388FB1F23F8 124330~|~1~|~2~|~02/STR~|~Plan Split for ODOT funded resurfacing~|~05 - 4R Maintenance - Resurfacing~|~C91FEF96BBD5C3317E1D1613F051220BCCE29A45 111491~|~1~|~1~|~01/MPO~|~Construction of a shared use path on the Wasson Way former RR corridor from Madison Road to Marburg Avenue. Construction of a new trailhead at Marburg Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~D07FFDAB5DF04E8065D4D2305C83A5FC6DDADB8D 111491~|~1~|~2~|~02/SAF~|~Trail connection between Madison Rd and Wasson Rd, and new traffic signal on Madison Rd for trail crossing.~|~21 - Safety~|~8667B3378CB7383855DF76417B3A932EA1525EF6 122765~|~1~|~1~|~01/SAF~|~All work at FRA US 33 at Rager Rd intersection~|~21 - Safety~|~5A906485F3AB9C3D3710F03A136639CE891F7677 122765~|~1~|~2~|~02/SAF~|~Remove median crossover access at Bixby Rd by change order~|~21 - Safety~|~0FA51E785262F5DF5D05911C63C608906E5CF606 117469~|~1~|~1~|~01/BRF~|~ATH CR 46 C 0.96 (SFN 054968)~|~13 - Bridge Rehabilitation~|~6B73C88A474F8F3F419242DD2E59D80F89385BFC 123920~|~1~|~1~|~01/NFP~|~Deck sealing~|~47 - Bridge Preventive Maintenance~|~8528CF4CC2518C2807E87B3F2847E4F9F337335A 121087~|~1~|~1~|~01/NFP~|~added RPM FY2023 plan split.~|~21 - Safety~|~7ED861215438330D3EB4BE5D1D0A114AD5FD1013 82453~|~1~|~1~|~01/S>2~|~Resurfacing and pavement planing with Item 446 asphalt concrete in Trotwood on US 35 from Bricker Avenue SLM 9.66 to the Junction of SR 49 (SLM 10.32) This is part of the Urban Paving project and the Corp Line is down the center of the roadway so it is split 50/50.~|~05 - 4R Maintenance - Resurfacing~|~7D927C779604CA95FD52257D02B209CA3A6411A8 82453~|~1~|~2~|~02/S>2~|~Resurfacing and pavement planing with Item 446 asphalt concrete on US 35 from Bricker Avenue SLM 9.66 to the Junction of SR 49 (SLM 10.32). This is covered by the District allocation as the Corp Line is down the center of the roadway.~|~05 - 4R Maintenance - Resurfacing~|~8A3721C1EDD3304FC5F4A25CEFF323D9FB2928DC 111200~|~1~|~1~|~01/MPO~|~MPO funded plan split~|~04 - Reconstruction - No Added Capacity~|~FA53630894EF0A2F24A92443B4EB1D3995D3B1EA 111200~|~1~|~2~|~02/NFP~|~100% LPA funded water line work.~|~04 - Reconstruction - No Added Capacity~|~BFA7B6E44CE30F248F7132F13225C85987A76E4E 116793~|~1~|~1~|~01/STR~|~Items associated with culvert and storm sewer work.~|~66 - Resilience Improvement - Highway Project ~|~728CB5D3350E23C7C7D5B91DBA8E25C7C8CB0FCD 115360~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing of Chestnut St in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~0EB9944DDB7E015658574F28F4CB9AB32626A2A6 115360~|~1~|~2~|~02/MPO/RAVE~|~Resurfacing of S Prospect St in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~8AC72FC67263A73A48FC009D791DBEC922D6AF37 100568~|~1~|~1~|~01/IMS~|~Replace existing deck on BEL-70-2618 (SFN 0702978) with new reinforced concrete deck to be made composite with the existing steel.~|~13 - Bridge Rehabilitation~|~99BF5895952F5E411C4EE2BDF7129B84FDB339BB 125798~|~1~|~1~|~01/NHS~|~Resurfacing MEG US 33-04.25~|~05 - 4R Maintenance - Resurfacing~|~985B2BFF40D53B7F469BCE662ED5F497B79CFD48 125798~|~1~|~2~|~02/STR~|~Resufacing MEG SR 7-08.221~|~05 - 4R Maintenance - Resurfacing~|~629810A55C90CC7FC8044F0D50C93846407A4F1C 90795~|~1~|~1~|~01/MPO~|~Replacement of defective sidewalks, curbing, alley mouths, driveway approaches and curb ramps; the installation of banners, benches, trash receptacles, tree grates and other assorted amenities; and the repair/replacement and installation of landscaping on North Main Street in Dayton from Burton Avenue to Norman Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~1C9242F56624DD929D5FE48B24B2F21B3B8DD117 103676~|~1~|~1~|~01/S>2~|~Resurfacing of Central Avenue from Slip Lane (south of Xenia Drive) to Broad Street. Pavement repair will be performed as needed.~|~04 - Reconstruction - No Added Capacity~|~2BA0AA29532B55F0E4E55D537BCE5BD7A1179F8A 125616~|~1~|~1~|~01/NHS~|~Bridge painting project. WAS 50 4.89 L (SFN 8401381), R (SFN 8401411).~|~47 - Bridge Preventive Maintenance~|~C1283D0C9413C6D2E87D4CE13E266EFA5487A7ED 125616~|~1~|~2~|~02/IMS~|~Bridge painting project. NOB 77 13.96 (SFN 6100783).~|~47 - Bridge Preventive Maintenance~|~E8AE97BE7EEFF6FE4E9E4FDCEA38DAC969DE0ED1 84548~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a Microsurfacing asphalt treatment. HOC SR 93 10.81-12.13. Urban Federal aid funded 80 Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~C657B227E9421DA6D0D26CB1F9A33F9C847C7757 84548~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using a Microsurfacing asphalt treatment. HOC SR 93 12.13-12.25. Urban Federal aid funded 80 Federal/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~BF128637AB7B0C7704168B6401B29D7EC884AFB4 84548~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 7.31-10.81 and MEG 733 0.25-2.25. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C3C972EF9F86C1C9F639BB1388090F63E7679151 115431~|~1~|~1~|~01/MPO~|~NOACA funded TLCI portion~|~28 - Facilities for Pedestrians & Bicycles~|~FEE2EAD97861A54B5AF5F162793DCA9CC599BF4F 115431~|~1~|~2~|~02/S<2~|~4R Maintenance - Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~328E3CA74157FC687219CEFFC9ABB2BDFDCF8A83 115431~|~1~|~3~|~03/SAF~|~Safety Items: Sidewalks and Enhanced Crossings~|~21 - Safety~|~A3A3BC302B73B737495124D3A82E2BDD9FC9D92B 115431~|~1~|~4~|~04/ENH~|~100% Local Items~|~05 - 4R Maintenance - Resurfacing~|~DE8456DC982D696084815326E15D81897A5DFDE0 123266~|~1~|~1~|~01/NHS~|~Mowing.~|~44 - Other~|~BCF0317E207501449003004ED7554EF08CA435E3 123007~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~6A078AAE367ECE19C28A103D3E3CEAA60466A392 91951~|~1~|~1~|~01/NFA~|~Design-Build project will resurface roadways and parking areas within East Fork State Park in Clermont County.~|~05 - 4R Maintenance - Resurfacing~|~016CBAAAF4EE1AD90EB08C99165B691C1EC40C6B 120780~|~1~|~1~|~01/S5K~|~Installation of traffic signal at US 40/Kopchak Road~|~21 - Safety~|~1F312834E4576BC2D6A7C487E7EB974984B7473C 108008~|~1~|~2~|~02/NFP~|~RIC IR 0071-10.68 & ERI US 0006 17.78 Locations only.~|~21 - Safety~|~156D79EBC131D6E9FC423F26D50BBCE4B9E2A997 108008~|~1~|~1~|~01/NFP~|~All locations except those on split # 2~|~21 - Safety~|~0D03B1C2D8DF8F8E22A26752789405C6FF827B09 124918~|~1~|~1~|~01/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~3F7CBFCBAC8B16A58DADA8E2BE84573FAF3813CA 104843~|~1~|~1~|~01/MPO~|~Guardrail replacement project. WAS CR 3 13.19-15.72 and 16.11-16.39. 80% Federal MPO-STP and 20% Local funds on Major Collector.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D3398DE6E678080B305A8FC8929A470AEC439A39 104843~|~1~|~2~|~02/NFA~|~Guardrail replacement project. WAS CR 3 10.52-13.19. 100% Local funded on Non-Federal Aid system.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E8C58B98857E9D143A41B673FB036EBC447AFA76 88981~|~1~|~1~|~01/STR~|~BRO US62 13.92 - 18.97 resurfacing projectOn US62, beginning 0.07 miles north east of the US62 ramp, north east for 5.12 miles and terminate the project 0.1 mile north east of the Russellvile north corp limit, it is proposed to resurface the highway with asphalt concrete.Pave thru brdg:0801410 BRO US62 16.75 Intersect: Trib West Fork Eagle Crk80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~9151F3C4FA322C0D74C9D32247AC27F297921996 88981~|~1~|~2~|~02/STR~|~BRO US 62 16.60This was an emergency job under DSR# BRO-003. See PID 101629 for additional ER cost.~|~04 - Reconstruction - No Added Capacity~|~EF57C8BB482DF4D67529E12F4530AA3CDC502EC4 124782~|~1~|~1~|~01/NHS~|~Plan split 1 for conduit replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8BEC8B49094273C59C00B815E0F75F5E096B7394 96628~|~1~|~1~|~01/NFP~|~Mowing contract. Maintenance contract funds. 100% state funds. SAC 4CP7.~|~44 - Other~|~360A2C9509F73F50E86421845FB42C877880FDB6 121164~|~1~|~1~|~01/STR~|~All plans are within this split~|~44 - Other~|~00355A96B2CC0C54C0444B1D1D27494A7F861D83 118853~|~1~|~1~|~01/NHS~|~NHS plan split for resurfacing related items on PIC-23-16.94-17.33 in the Village of South Bloomfield.~|~05 - 4R Maintenance - Resurfacing~|~AC5D36D2B0020AF71A278BBAB3F00EBCCABD5E71 125051~|~1~|~1~|~01/NHS~|~Pedestrian crossing and sidewalk improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~4D551BF4004908B7CE3A43F27690293AAD63744C 117171~|~1~|~1~|~01/IMS~|~Split for the pavement work. ~|~05 - 4R Maintenance - Resurfacing~|~5AA1C4738E61CE450CBC33CB014A62714ACD5B4C 102857~|~1~|~1~|~01/NFP~|~All work is in this plan split. 100% state funds from the District Preservation budget using SAC 4PS7.~|~21 - Safety~|~0F10E05F9863136E192C637E675FDD06CFF1E1A2 123420~|~1~|~1~|~01/S50~|~ Small City Program Funding for SR 61 reconstruction project (FY2029) with Reservoir of FY 2028~|~04 - Reconstruction - No Added Capacity~|~3863224C20078A990F7B9E628337E3D1B0CB00CE 123420~|~1~|~2~|~02/S50~|~Small City Program Funding for SR 61 reconstruction project (FY2029) with a reservoir year of FY 2028~|~~|~5124F41565479613E4CC44174D6C3C0E30C1BC92 105271~|~1~|~1~|~01/STR~|~Resurfacing of COL-518 from SLM 6.69 to 11.07~|~05 - 4R Maintenance - Resurfacing~|~5F93090E7C066AABA9FE3B9F538E95212672278B 114225~|~1~|~2~|~02/S>2~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~77D7385A46BFFBB181619A00C94A7B4BB0792813 114225~|~1~|~4~|~04/STR~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~48350A510653ECA1A4604104086BB929A9BEE984 114225~|~1~|~3~|~03/S5K~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~00E8EBDDD1A3F15F7E963F6A3FCE63774F513136 114225~|~1~|~1~|~01/NHS~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~48ACF185DE049C51A324B8D46363389E663C66D1 110507~|~1~|~1~|~01/NHS~|~Repair damaged structure JEF-22-1481 (SFN 4104277) Over CR 43 due to over height vehicle collision.~|~13 - Bridge Rehabilitation~|~8FB2CD03A3BCE51CBA011444A0B1BB9022B6F8D5 84549~|~1~|~1~|~01/STR~|~Resurfacing project. ATH 56 0.00-10.29. Federal Aid Major Collector route, Federal/State 80/20%.~|~05 - 4R Maintenance - Resurfacing~|~6566F3087A8E93DFDAC5F0F898E556D625C6E03D 84549~|~1~|~2~|~02/S<2~|~Resurfacing project. ATH 56 10.29-10.48. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E732234ED30CF4DF928C594228F088F84A161051 84549~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay with repair treatment. ATH 56 10.48-11.44. Urban other federal aid funded 80 federal/20 local in the City of Athens.~|~05 - 4R Maintenance - Resurfacing~|~C578F96ED1656D491C7AA427D9ED1CF10CD2331D 88221~|~1~|~2~|~02/S>2~|~Pavement markings, raised pavement markers and traffic signal loops~|~~|~4716DE3CCEBB7329E76AEE83A13EA26F14C292AB 88221~|~1~|~1~|~01/S>2~|~Mill and replace surface asphalt, along with replacement of curb, add sidewalk, adjust catch basins, manholes and watervalves~|~44 - Other~|~58DCDCF3986E3D79B9B4BC6C3EF4DA0BCA186D55 122336~|~1~|~1~|~01/S50~|~Superstructure replacement on FAI SR 360 00.07 (SFN 2303469).~|~10 - Bridge Replacement~|~06AE0D82D33993741D1EEEF98EFD88A9603C35A4 101381~|~1~|~1~|~01/NFP~|~Tree removal/pruning for District 8.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AA41A33C6E95F9FA7C386BFCE1B59D059942EAB4 111728~|~1~|~1~|~01/SAF/STOW~|~Intersection improvement at Graham Rd and Fishcreek Rd.~|~21 - Safety~|~DC81BD7B338529B04722FAEE08BE889A612D0056 105939~|~1~|~1~|~01/MPO~|~resurfacing work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~92A288028340151260DE4FC27E32FB58321C366E 96138~|~1~|~1~|~01/NFA~|~Construct a new 40' x 60' storage lean too at the ODOT Mercer County Full Service Facility.~|~44 - Other~|~524C711ABA3EFA482E7AD204BDACDCE6540B769A 107133~|~1~|~1~|~01/SAF~|~Install friction surface treatments at 12 locations in D8.~|~21 - Safety~|~DF3867E303DC0664B4388E3CC88E1A6D90ADFFF1 107133~|~1~|~2~|~02/SAF~|~Friction treatment on 4B and Symmes Rd in the City of Hamilton.~|~21 - Safety~|~2B039FF6B46A7671AE2F8A3F24BFECD9BA2F2125 107133~|~1~|~3~|~03/SAF~|~Friction control on 4B and Symmes Rd in the City of Fairfield.~|~21 - Safety~|~286F8C0EBB6C2EFB386694347A1352E257CC89AB 102119~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~775DCE83F2FBBE764666537A5962462BFABF1E63 104783~|~1~|~1~|~01/NFP~|~Pavement marking and RPM's on various routes~|~21 - Safety~|~71CF71B3327FD5D7AEA12F45116E9174D7D3E387 116054~|~1~|~1~|~01/BRF~|~Replace E. Water St. bridge.~|~10 - Bridge Replacement~|~206973655572268E55717566EB01626CC820F523 121685~|~1~|~1~|~01/NFA/GCEO~|~Mill and fill resurfacing of CR 43 (Ideal RD).~|~05 - 4R Maintenance - Resurfacing~|~23BE00797DEC1655971859C1809E2D3ADC26FB8D 108081~|~1~|~1~|~01/S50~|~Drainage work at FRA-33-8.75 - culvert replacement, storm sewer work and other miscellaneous items~|~04 - Reconstruction - No Added Capacity~|~DB533A69235E6124F57940A93C5571F3FD0FEBAD 121353~|~1~|~1~|~01/IMS~|~Interstate plan split~|~05 - 4R Maintenance - Resurfacing~|~5BE308BD2ACC3C10DBD93E98B8AF9DA5026A1BFB 121353~|~1~|~2~|~02/STR~|~STP Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~191976BC31AF453937C62CCCBA174E35F01F620C 95241~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. ATH 78 9.96-11.353, MRG 37 8.22-9.59 and MRG 78 0.00-16.826. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~416A5654DD6B93B30F075585EE8353A3EA9433DB 108643~|~1~|~1~|~01/STR/MCEO~|~"01/STR/PV/MCEO" - CAP of $2.0M from CEAO (4b77) - 80% Federal (4B77)/20% Local (LNTP) - Resurfacing and related work on CR 616 from 0.00 to 9.22.~|~05 - 4R Maintenance - Resurfacing~|~6A4768B45FB04874A5B4910CA41AF5D2A320CF35 101527~|~1~|~1~|~01/STR~|~DSR# HAS-001~|~04 - Reconstruction - No Added Capacity~|~F909CBDA0A026298E574952DD3C9ECDACDA5AEB7 105925~|~1~|~1~|~01/NHS~|~Slide correction along State Route 5 at SLM 6.57 in Charleston Township, Portage County, Ohio.~|~44 - Other~|~3F9CF851690374402EAD4DE5043367CAB8ED1245 105629~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-22-15.91-17.62~|~05 - 4R Maintenance - Resurfacing~|~0676D780B4EB343B9C17224DD91BCD1ADD6ACAC0 82938~|~1~|~1~|~01/STR~|~Replacement of two structures. Not BR eligible. Rural. TRU-0045 1895 7802250TRU-00534 1819 7807562~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AB52B178CDD51B79B5C0AD1CB30D7790C29853A6 120153~|~1~|~1~|~01/SAF~|~Roundabout~|~21 - Safety~|~656DE1AD51A269412CC8779E0CAA348CB9D2B5D1 126612~|~1~|~1~|~01/CMQ/MACE~|~Signal upgrades/replacements.~|~21 - Safety~|~6DFBC761C452569C56A6CA80857EDC6704102597 114478~|~1~|~1~|~01/NFP~|~Crack sealing~|~05 - 4R Maintenance - Resurfacing~|~A46554C150672B14A82432F8B03EFABBFF2D6BC1 93838~|~1~|~1~|~01/NFA~|~Caeser Creek Wildlife Area (CLI, GRE, WAR); Spring Valley Wildlife Area (GRE, WAR) Project consists of asphalt resurfacing, chip seal, and a wood bridge deck~|~05 - 4R Maintenance - Resurfacing~|~7D2E76C0A5064FFCA53E02972079252609002CE1 124424~|~1~|~1~|~01/STR~|~Install sidewalks~|~21 - Safety~|~2193F3706414E547277D14155A377F5CCD4D52A9 126947~|~1~|~1~|~01/S>2~|~Roundabout at the intersection of Havens Corners Road and Taylor Station/Mann Road~|~21 - Safety~|~CBDF33F4A023B5A998C36F21836A8154104C86C3 118929~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items.~|~05 - 4R Maintenance - Resurfacing~|~E068C345957765E4CAC6D5986C157A0D99529ECB 102922~|~1~|~1~|~01/NHS~|~NHS Portion (WOO-23: 6.02-11.84)~|~05 - 4R Maintenance - Resurfacing~|~A6E01B83E16DFBAC021C3169BFAE007DAE717AEA 102922~|~1~|~2~|~02/NHS~|~CL rumble Stripes from 6.02 to 6.52 and from 7.27 to 11.84~|~05 - 4R Maintenance - Resurfacing~|~F8D7140EC8413CD44A8FA5BCB53862F07DB87C19 102922~|~3~|~3~|~03/NHS~|~Adding fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~095D02D24CD55E2A2DC94952F148D77D9F159E30 103946~|~1~|~1~|~01/NFA~|~This project includes the widening and reconstructing of Chester Road from Jaycox westerly to the newly improved five lane section at the future site of Cabelas. See PID 102918~|~01 - New Construction~|~47FB5AC8BADE4A8F1AEC3549B3DB43D50090D101 100895~|~1~|~1~|~01/NHS~|~SCI-52-0.84 (SFN 7300425) Bridge Replacement~|~10 - Bridge Replacement~|~56595D7234A4BBACB5C284075D4AB9418E4B71ED 121910~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 111 4.65 (SFN 8431760).~|~10 - Bridge Replacement~|~1539FE4BB7051AFE065A229E5E7100EFBDD51EED 119228~|~1~|~1~|~01/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~CE51767065FCDF59C03E1ED96DF46D033CE97B2B 101099~|~1~|~1~|~01/S>2~|~Generic Plan Splite for traffic signal inspection in District 8.~|~17 - Construction Engineering~|~C5ABA6F269DAF9425F333D6C409D9B2B0F49CF4C 93089~|~1~|~1~|~01/BRO~|~7607733 Clarenden bridge overlay and painting7607776 Harrison bridge overlay and painting7607806 Dueber bridge overlay and painting~|~13 - Bridge Rehabilitation~|~224842F6B2903AC275AEBFDAE46589022DD7B592 93089~|~1~|~3~|~03/S>2~|~Resurfacing of Harrison Avenue (CR-254) from SLM 9.41 to 9.57. Funded by the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~57D680E923AD1F30A1B68E7CAAA3C7EEDDA67548 93089~|~1~|~2~|~02/NHS~|~7600917 24 inch watermain painting~|~13 - Bridge Rehabilitation~|~D740B0E75DA52A98853A8FCEBBFE6DA582193AC7 91030~|~1~|~1~|~01/MPO~|~Minor rehabilitation~|~~|~FF29CF0E60C4A03F5CEB4E8CFD79AD180D4744A9 114251~|~1~|~1~|~01/NFP~|~Pavement Replacement/Repair utilizing State Oil & Shale (4SH7) Funds.~|~04 - Reconstruction - No Added Capacity~|~FB818D1ED0D3249F97CF5B691EAF74D81999A757 92645~|~1~|~1~|~01/MPO~|~Mill & Fill~|~05 - 4R Maintenance - Resurfacing~|~7D48B5912A5964928388F80E82DCB7A50111669A 92645~|~2~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items~|~05 - 4R Maintenance - Resurfacing~|~C70FF1FAC0CBB65D4041A05FC3DD9BC2C787881F 90810~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay. VIN 327 0.00-4.94. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~18395671BBD5485D34F5EFA4D9968D881E0D36CE 122462~|~1~|~2~|~02/NHS~|~Second plan split for construction contract costs above the Project Cap for 4PR7 (PROTECT) Funds.~|~48 - Bridge Protection~|~F753266521589B73EA0C285BCE64CD4CEB368784 122462~|~1~|~1~|~01/NHS~|~PROTECT bridges carrying SR 11 over West Fork Little Beaver Creek and US 30 from scour.~|~66 - Resilience Improvement - Highway Project ~|~58626A57CE5F9AAFEBE7617F2333E63A260886F0 85403~|~1~|~1~|~01/NHS/Clev~|~80/20 funding split in NHS section for work that is eligible for Urban Paving funds.~|~05 - 4R Maintenance - Resurfacing~|~C9FBE4A2E37D8F09F9FDEEAC24410A161CA4CF5A 85403~|~1~|~2~|~02/NHS/Clev~|~100% local items~|~05 - 4R Maintenance - Resurfacing~|~DE3C3B0D069EFD2DAAFA2709B13D8329507919A1 91659~|~1~|~1~|~01/STR~|~A FHWA Disaster OH11-02 flood project. DSR HAS-004:Massive Fill Slope Failure - 200' long, 100' to Toe . Slide is in the roadway embankment beneath road.~|~04 - Reconstruction - No Added Capacity~|~478109268800A1A8D716C1781BDAB7E84D5399B1 102901~|~1~|~1~|~01/SAE~|~Installation of replacement guardrail in various locations within the County.~|~21 - Safety~|~5EAEB2D8CFB9BD0167E710EF669E20BAF4AE3A20 99992~|~1~|~1~|~01/SAF~|~Provide maintenance of traffic to address accident damage until deck edge repair project being sold in July.~|~21 - Safety~|~3D09F6BAA1F736ABAEC37D041C09AB667CEFA52B 89471~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Replace existing bridge over Cross Creek on existing line and grade.~|~10 - Bridge Replacement~|~9E7369C4C306C807328ECF05E495F3B053E6CE3C 101306~|~1~|~1~|~01/IMS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~4EBA5E97245D578B45E6B234D99BE33DC8CD4318 101306~|~1~|~2~|~02/NHS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~AED8DFAE1A3C5F4C9E443B49ACE1D15617EFA91E 101306~|~1~|~3~|~03/S<2~|~Bridge cleaning,~|~13 - Bridge Rehabilitation~|~A37CED14353D2E9ACE42A012ECC5C4F92DB24F1A 92022~|~1~|~1~|~01/NFA~|~Add Sidewalks to Warren Riverwalk~|~28 - Facilities for Pedestrians & Bicycles~|~22382E4563E25D036487608128363285C03EB631 126251~|~1~|~1~|~01/NFP~|~Repair landslide occurring in northern embankment of SR 725 west of the Village of Camden.~|~04 - Reconstruction - No Added Capacity~|~924D29B53F03F0E5511289B38AA7EA5C1E7C554A 93562~|~1~|~1~|~01/BRO~|~Replace SFN 5502888 MIA 75 1373.~|~10 - Bridge Replacement~|~DAF11A1D414E8135AE9FBDF4A818AC21F65CAC2D 93562~|~1~|~2~|~02/BRO~|~Replace deficient bridge.~|~10 - Bridge Replacement~|~A7CEE24DE2DAA4F4A0754E661061ABB79DC6BE96 82672~|~2~|~2~|~02/MPO~|~Added split for 100% local items~|~04 - Reconstruction - No Added Capacity~|~C75546CC276EDAE4B5BE7AD71648BC723C5CA342 82672~|~1~|~1~|~01/MPO~|~Underpass project on Camp Street in Sandusky~|~04 - Reconstruction - No Added Capacity~|~FCCDA3D6CC9E986D65E34BDFAD9B596AFC1143E3 87819~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on TUS-39-15.45 to 15.77; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~3182460433786E2BF78FCCEC9F48F41B01876EAE 87819~|~1~|~1~|~01/STR~|~General System Minor Rehab. on TUS-39-15.77 to 19.94; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~4D0BB1A0A7E70790754E67AAEC0838445EBB8232 126887~|~1~|~1~|~01/NHS~|~All work included in this plan split.~|~04 - Reconstruction - No Added Capacity~|~6DC106C4D10630479DDB1440BE848ABE450186A2 123399~|~1~|~1~|~01/STR~|~Rural~|~21 - Safety~|~E124A781A2EC2ABC342CD29646049671B95E24DE 100593~|~1~|~1~|~01/NHS~|~Resurfacing of COL-30~|~05 - 4R Maintenance - Resurfacing~|~E740356B167EAD08D0E8F0FAB9165FE81CD84AC3 112986~|~1~|~1~|~01/IMS~|~Rehabilitate the CLI-71-0725 bridge that carries Gurneyville Rd over I 71 and the CLI-71-1421 bridge that carries Starbuck Rd over I-71 by replacing the deck, painting the superstructural steel, and converting to semi-integral.~|~13 - Bridge Rehabilitation~|~38FF2CBACF1D04A2EFFECDD493BBFF6E393C77AD 111220~|~1~|~1~|~01/ENH~|~Shared use path. Federal funds from the Transportation Enhancement Program (TAP) and CMAQ funds from the Lima MPO. TPA funds will be used first then the CMAQ funds. The Village of Bluffton will provide the match and all the funds needed after the TAP and CMAQ caps are reached.~|~28 - Facilities for Pedestrians & Bicycles~|~211DC77E631BA76F772CDF3E0EFC1B4F912FC3AC 106747~|~1~|~1~|~01/SAF~|~Safety eligible items~|~21 - Safety~|~687402C75B244A50784B4803FC1960DB84DF6EEF 121709~|~1~|~1~|~01/SAF~|~Traffic signals.~|~21 - Safety~|~ACBF1A0225409B484A5F7AC9148D4D7B09CEF8AA 119548~|~1~|~1~|~01/IMS~|~Plan split for truck parking work in former weigh station~|~44 - Other~|~12C64B87D9D4B73390902BD74F8B38CCAC3FC34B 99529~|~1~|~1~|~01/IMS~|~Reusrfacing work funded at 90/10 fed/state~|~05 - 4R Maintenance - Resurfacing~|~279FB539606A56521D2ED630DCE55589807271F9 120437~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT 100% State (4PS7)~|~21 - Safety~|~24A6E9F2AC2E45C65D5B1C38D6FC1376050D6B2C 96879~|~1~|~1~|~01/MPO~|~Mill 2", partial and full depth pavement repair, pave 3" asphaltic concrete.~|~05 - 4R Maintenance - Resurfacing~|~FC0E80E66F038613BC0FD22A63446800ECC50213 96879~|~1~|~2~|~02/MPO~|~100% LPA items~|~05 - 4R Maintenance - Resurfacing~|~78E30F52D302C324A341B3FE31523E371579F259 96879~|~1~|~3~|~03/S<2~|~Urban area from SLM 3.02-7.64~|~05 - 4R Maintenance - Resurfacing~|~804767784BF0FC50DE98720BB6C484EDD9FD8C8A 97963~|~1~|~1~|~01/S<2~|~SR 365 SLM 0.00 to SLM 0.16 and SR 720 SLM 3.14 to 4.12 (OC 798) - resurface the existing roadway with asphalt concrete (2.00 in).~|~05 - 4R Maintenance - Resurfacing~|~BCDBA4742265EBBF83B9B9F589511EDB128C0466 97963~|~1~|~2~|~02/NFA~|~SR 720 SLM 0.00 to SLM 3.14 (ZR 000) - resurface the existing roadway with asphalt concrete (2.00 in).~|~05 - 4R Maintenance - Resurfacing~|~ECE5D85B27E51ACF6DB511C68AF46CF81B4A2660 105316~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 3: Removal of the south utility trough (currently empty) from the existing WHV.~|~17 - Construction Engineering~|~57339BE0B85B6FDF0358B67B4B137C390996BCBF 96489~|~1~|~3~|~03/S<2~|~Guardrail upgrade/replacement contract for FY 2016. HOC 216 0.00-0.10, GAL 588 6.95-7.74 and GAL 588 9.89-10.50. STP Urban route, funded 80% Federal and 20% State.~|~21 - Safety~|~8D66F75F7C8FF1BC421FA0A3151ACFD04D81E0AE 96489~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement contract for FY 2016. VIN 671 0.00-3.00. Not on the Federal-Aid system, still funded 80% Federal and 20% State.~|~21 - Safety~|~E9DAED047C843FD06DC8C7A1FBBD7CA129187DDD 96489~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement contract for FY 2016. GAL 588 0.00-6.95 and 7.74-9.89. HOC 56 9.50-14.00, HOC 93 8.70-9.00, HOC 180 0.05-16.00, HOC 216 0.10-4.20, HOC 668 0.00-0.10. MEG 689 0.00-4.15. VIN 56 1.55-1.65. VIN 278 2.95-3.20. STP Rural route, funded 80% Federal and 20% State.~|~21 - Safety~|~0535DCC73C40BD536BCA0F0D043AC464875A25F6 96489~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement contract for FY 2016. MEG 7 0.00-8.00. WAS 7 9.75-14.00. NHS route, funded 80% Federal and 20% State.~|~21 - Safety~|~A911AE92FE955DF56FE5B1D9686FFA5B7A38774A 88806~|~1~|~2~|~02/STR~|~SFN 5205883 MED-162-4.31SFN 5205913 MED-162-4.55SFN 5205948 MED-162-4.87SFN 5206006 MED-162-7.86~|~47 - Bridge Preventive Maintenance~|~286C5A18B1C0A6A5EDE3B61C86454443222E0286 88806~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~3F8E3C1BD13FCA7095711292F502FB599CF46BED 88806~|~1~|~3~|~03/STR~|~Bridge < 20 ftSFN 5205972 MED-162-5.42~|~47 - Bridge Preventive Maintenance~|~91193B54FDA4A5694CF702EE317F5A88A7FFFC53 116986~|~1~|~1~|~01/NHS~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~A7ADA6657BD9F095623796DCCFC0A5D24F1038B1 109724~|~1~|~1~|~01/NHS~|~NHS Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~EDE3433D0AAFB4A076EC614D47CB2E2472E0BF5C 109724~|~1~|~3~|~03/NHS~|~Moraine UPP~|~05 - 4R Maintenance - Resurfacing~|~9894127A7FE1A430FBACE2F80A5765F66E357048 109724~|~1~|~2~|~02/NHS~|~Germantown UPP~|~05 - 4R Maintenance - Resurfacing~|~473C8883D3088CACBDC90E44901E332DA49C6452 109724~|~1~|~4~|~04/NHS~|~Dayton UPP~|~05 - 4R Maintenance - Resurfacing~|~960DA52732A23B5C34D690D60861365ADB055F99 91833~|~1~|~1~|~01/IMS~|~Spot paving on FRA IR 70 and FRA IR 270 at various locations~|~05 - 4R Maintenance - Resurfacing~|~0CF17D4518B3FCB61733B9AB9BA7D4C10574B54D 111564~|~1~|~1~|~01/MPO~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~27338DCD7900DA039B454A658D3C33DE3DFC18FE 81871~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation Culvert Funding 4CW7(80% Federal) / 4CV7(20% State) - No CAP - Culvert replacement on FAI US22 22.92-22.94~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2EE9B90640CC1A8EB60AA9101DE6ADB31684D39F 113100~|~1~|~1~|~01/NHS~|~Split for drainage structure lining project~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~23BDC1D232C8824066A239354555848602B58EAC 101453~|~1~|~1~|~01/STR~|~DSR# HOL-001~|~04 - Reconstruction - No Added Capacity~|~FA30E8D367A4D6CF1E46797EB27A577F93107EA5 104944~|~1~|~1~|~01/MPO~|~Addition of a southbound right turn lane from Kenwood Road to US-22 (Montgomery Road). In addition, a physical divider will be constructed to separate the southbound left-turn lane from other southbound traffic on Kenwood Road. A shared use path will be constructed on the east side of Kenwood Road in place of the existing sidewalk.~|~~|~133DA1AE56EBABAF8E472F301A874FEA8EF8861C 98286~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP ? deck overlay and other repairs on 1) 3001989 GUE-70-20.82 Intersect: Salt Fork; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=78.0 DSR=6; 2) 3002012 GUE-70-20.82 Intersect: Salt Fork; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=78.0 DSR=7;~|~13 - Bridge Rehabilitation~|~90FF5F6EEBA1FC06382583D2512DBC92B6047B86 126174~|~1~|~1~|~01/ENH/FAIR~|~Construction of a 10ft wide multi-use trail.~|~28 - Facilities for Pedestrians & Bicycles~|~4CA4B2E4706EC847D34CA67B6D3F12E05DC19BDE 117467~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~30DB85830CB9A75B9589F26802D7D39AB4C53E16 96875~|~1~|~1~|~01/NFP~|~District wide RPM plan for FY 18 systematic RPM replacement.~|~21 - Safety~|~8D69565179EEB4D9E0856F7DEF2B514519570D08 109649~|~1~|~1~|~01/S<2~|~Roadway realignment~|~04 - Reconstruction - No Added Capacity~|~61502DE5822BE6DD0953A17829CD394A7110A4FE 117101~|~1~|~1~|~01/ENH~|~All work for sidewalk/shared use path along this project. The work will be paid for with funds from the Transportation Alternatives Program (TAP) up to the cap and then safety funding will be used until the caps are reached. After all federal funds caps are used, any needed funds will be provided by the City of Defiance. ~|~28 - Facilities for Pedestrians & Bicycles~|~8AF4B4FA6459F1AD818965B851BF6392394EFD0B 117101~|~1~|~2~|~02/S5K~|~All roadway reconstruction work included in this split. ~|~04 - Reconstruction - No Added Capacity~|~86CF7929AF14DC7B90DBD4B84EF6F89C65F7B795 101431~|~1~|~2~|~02/S<2~|~Paving in City of Shelby - 80/20 Fed/CityRIC-96-4.62 to 4.71 (Full Corp) RIC-96-4.71 to 5.13 (Split Corp)~|~05 - 4R Maintenance - Resurfacing~|~24043FA575B1393C809BCC786099F19377F04D00 101431~|~1~|~3~|~03/S<2~|~Paving in the City of Shelby - 100% City Cost RIC-96-4.62 to 4.71 (Full Corp) RIC-96-4.71 to 5.13 (Split Corp)~|~05 - 4R Maintenance - Resurfacing~|~C20CF5EC582957C16B1CBED7E05D8AFB3D07EDA4 101431~|~1~|~4~|~04/S<2~|~Bridge Work for STP < 200000~|~13 - Bridge Rehabilitation~|~F88C5111A09552B5F94B7AB4F80691452CFDEA46 101431~|~1~|~5~|~05/SAF~|~Funding for Rumble Stripes.~|~21 - Safety~|~4D7A075B91AC90067EECEE6FEE605047E6B7E810 101431~|~1~|~1~|~01/S<2~|~RIC-61-7.69 to 13.18RIC-96-5.13 to 11.99~|~05 - 4R Maintenance - Resurfacing~|~7B4F43827531B01724809F9BAB72D77F17A06891 126901~|~1~|~1~|~01/IMS~|~Plan split for lighting repair and replacement throughout the district~|~21 - Safety~|~69973F7E7BA6BFC140D1333185348C819AC64A47 92859~|~1~|~1~|~01/MPO~|~added plan split~|~21 - Safety~|~E3BAA7C805F9711F62C1DABA3D73F96FC236F546 112282~|~1~|~2~|~02/NFP/GCEO~|~Guernsey County Engineer's Paving Program Funding - LNTP (100% Local) - No CAP - Resurfacing with repairs to: 1) Gue-CR 95-06.76 to 07.82;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~94F408D9FE2C63094BC95B3B4FD05B067FBC51BD 112282~|~1~|~1~|~01/NFP/GCEO~|~Guernsey County Engineer's Oil & Shale Program Funding - 4SH7 (100% State) - See CAP Comment - Resurfacing with repairs to: 1) Gue-CR 95-04.48 to 06.76; 2) Gue-CR 95-07.82 to 08.39; 3) Gue-CR 74-03.09 to 04.66;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FC6ACEAB8F1F8118437F5B0A1939ACA8A15A2CA4 116604~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~7AF9C6FD11B74E231C230D76459C180D7F93C3F7 120394~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~E3105D3971E4741630539B5A4DE2BF4AC02E58B6 118924~|~1~|~1~|~01/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~60CBC5DDC43A4D946383355E465F7A626099F449 118924~|~2~|~2~|~02/NHS~|~bridge linked~|~13 - Bridge Rehabilitation~|~0CE8E1DB4D08D45E07D20E47EB1774A365AF2ADB 116489~|~1~|~1~|~01/NFP~|~FY28 RPM~|~21 - Safety~|~0BC6FF7D522DA7BC6A75FCE6D50EBA91DA437A6A 101913~|~1~|~1~|~01/NFA~|~Motor paving Happy Hollow road, ATH CR 1A 0.00-1.82. Federal Lands Access Program (FLAP).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D432C5F823ECD9F65A5CA9567B51F76E076A8BE0 101457~|~1~|~1~|~01/STR/NALX~|~DSR# JEF-005~|~04 - Reconstruction - No Added Capacity~|~7456D6A7A47344FD7FFE4DF89CB2D21BEC4ED7F7 101457~|~2~|~2~|~02/STR/NALX~|~DSR# JEF-006.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D935806AD1243E4302392A0F103B2C4906108BFF 104938~|~1~|~1~|~01/ERD~|~Construction of a bridge to link Centennial Trail to Wendy Park using TIGER funds.~|~08 - Bridge - New Construction~|~E6D1867434356ED424678D3D57D6CF0F2090C021 116627~|~1~|~1~|~01/NFA~|~RPM Installation.~|~21 - Safety~|~8286358BA2C8C55745614DA701224B1DDB2BB792 119651~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~26B2BFFE2D4769014EDD23CF5B460E62C176931F 100899~|~1~|~1~|~01/S<2~|~LAW 7 3.41-6.36~|~05 - 4R Maintenance - Resurfacing~|~781387A4B5CF8AA282931C8B1CD8C8B8B4D4ACB7 100899~|~1~|~2~|~02/NHS~|~LAW 7 6.36-10.72~|~05 - 4R Maintenance - Resurfacing~|~B7EDD914AF2C28FD27EEFCB8E7AED06D63F57648 126607~|~1~|~1~|~01/MPO/MACE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~ADDBB2F9A3EFB1BD000C9F14520288CE12A220E4 116641~|~1~|~1~|~01/STR~|~Rural plan split for resurfacing and resurfacing related items along UNI-47.~|~05 - 4R Maintenance - Resurfacing~|~104D0BC8A90619B0A76384DC16CFB3FA33763A4D 116145~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 1206 0.01, SFN5635382.~|~10 - Bridge Replacement~|~FA8C5957FDCD12AA8502D4C6F321EF883C4B4C8D 124116~|~1~|~1~|~01/NHS~|~Pavement widening~|~03 - Reconstruction - Added Capacity~|~DD618FFA3230A08444A5E6E0CBCF1633F243176E 101441~|~1~|~1~|~01/STR~|~FY 16 Allocations: $2.25M / FY 17 Allocations: $3.90M / FY18,19,20,21 Allocations: $3.50M~|~05 - 4R Maintenance - Resurfacing~|~775123161C3BAE4D6EBBA4A8525EBBD7F1596136 98360~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement contract for FY 2020. NOB 340 7.01-7.08 and NOB 564 0.00-0.03. Funded 80 federal/20 state.~|~21 - Safety~|~D86C05D518EB45478BA9B04B4A177310D445B828 98360~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2020. NOB 146 8.50-8.66, NOB 340 0.71-7.01 and NOB 574 0.00-3.68. Funded 80 federal/20 state.~|~21 - Safety~|~E02F77E0D50473D6CDEAAC3B9A79DF3E3B8B7EE9 98360~|~1~|~3~|~03/NFA~|~Guardrail upgrade/replacement contract for FY 2020. NOB 340 0.00-0.71 and NOB 564 0.03-13.48. Funded 80% Federal/20% State.~|~21 - Safety~|~745C8254ABEC8D02FC271C0626C6E4A87C3A9961 119190~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1EB0FAF8A15206751D34B06AA628FC3EC7C40638 119190~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B53CFDF606BDC75600BBDA67FAAFDAEC87F6DB60 121527~|~1~|~1~|~01/S>2~|~plan split to repair the landslide on CLE-126~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E2182DA55DC03300E64BB49D98F577FC9DD24361 95088~|~1~|~3~|~03/NFA/LICK~|~"03/NFA/PV/LICK" - utilizing CEAO authority for Minor Collector program to fund Minor Collector section of roadway between 1.81-10.54. Per discussion w/Michele Risko/Heidi Mertler.~|~05 - 4R Maintenance - Resurfacing~|~32C9FA75EB3248452236B61289DE5ECAEA392079 95088~|~1~|~1~|~01/S<2/LICK~|~"01/S<2/PAV/LICK" Martinsburg Road from the 1.73-1.81Licking County resurfacing project utilizing LCAT funds - from~|~05 - 4R Maintenance - Resurfacing~|~8C118AF9BD6F68FA33485CBD1E175442F821252E 95088~|~1~|~2~|~02/STR/LICK~|~"02/STR/PV/LICK" Martinsburg Road from 10.54-14.04 Major Collector section of Martinsburg Road utilizing LCATS Funding~|~05 - 4R Maintenance - Resurfacing~|~C25CD6A5C1F24A3E3ED06CBCDF45F872D8900645 118846~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~9B1BBAB78AD5D069A5FFA6CB9E74B4C2D1C949E6 118846~|~1~|~1~|~01/NHS~|~Resurfacing and paving over 10' to 20' structures.~|~05 - 4R Maintenance - Resurfacing~|~BFBAF1DAF4569AC18CECE819803D4DF953791918 118846~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~8C726C6C12339A572B7BB607C88DD4A0D0E50C37 124919~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2031.~|~21 - Safety~|~95ADF8C4F295E2FAFF05CB1AEE6437EC5BC1AFC4 87683~|~1~|~1~|~01/NHS~|~Brdg over US23 SFN 7101082 on CR13, to be replaced. Though this is part of CR13, the structure is part of US23 which is a fed aid route. 80 fed/20 state7101082 ROS CR13 16.12 Intersect: Service Rd (Old Sr-159)01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~CB77DCE8A35E1BBC7AE949F92CFB954401FFB18C 122469~|~1~|~1~|~01/NFA~|~Resurfacing roadway at the Castalia Fish Hatchery.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E39CCD822093DD791DB64C8F1E2CB8D2903A5C89 104012~|~1~|~1~|~01/ENH~|~Reconstruction of sidewalks to improve pedestrian access in the City of Nelsonville. TAP funded project. Funded 80 federal/15 credit bridge/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~BF25F61CF2BDE99BE0AE1411A8BF67840057CD8E 108889~|~1~|~1~|~01/BRF~|~Bridge replacement - Federal Exchange~|~10 - Bridge Replacement~|~7966222A47F4DA4EE1813EDB38888DA69BCC77BF 108889~|~1~|~2~|~02/BRF~|~Bridge Replacement - Federal Exchange - CE~|~17 - Construction Engineering~|~19B2007CD4C848F377FF7BF5623CC3A43CDD7F61 94009~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~2B60CCE20972EA7EBA4E38B34C49139EDDA8F992 94009~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~F392905251BB69BE36D4E91768D1AD8B15A0D431 94009~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E83C32BDB2B8C6C857D2AC145F3A8D9050D4C73A 103421~|~1~|~1~|~01/S<2~|~2 !/2" mill and fill on STP <2 route in the City of Kettering - UPP~|~05 - 4R Maintenance - Resurfacing~|~6E5A572B806CF4C9DB19444D03629A5126C945D7 103421~|~1~|~2~|~02/NHS~|~2 1/2" mill and fill on NHS route in the City of Kettering - UPP.~|~05 - 4R Maintenance - Resurfacing~|~C2C3DFC45E8EEAA99BD3183CE8223CC4C150526B 103421~|~1~|~3~|~03/S>2~|~Br. No. MOT-835-0257 to be waterproofed and paved with asphalt concrete~|~47 - Bridge Preventive Maintenance~|~C83ED18F52EE67DCE3132292C8A0F93F0AF30A5F 103421~|~1~|~4~|~04/S>2~|~Full depth concrete pavement repairs~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BC4E683D44B257003C4B35E8B88B51762348B20E 102865~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~9B8AE0AFBBEAE4B473616F8471B75E8258C1CF30 103938~|~1~|~1~|~01/S>2~|~Earthwork and slop protection eligible for GSM funding.~|~44 - Other~|~A473FB371C6C70D94FAF3394B8B843F67D1B724A 104962~|~1~|~1~|~01/STR~|~Plan Split for bridges MRW-95-1.92, MRW-95-3.40, MRW-529-1.51~|~13 - Bridge Rehabilitation~|~D099526BA6074F3E8130CB7DE91A1F04C6E89859 125572~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~C71860632F59FA4BE456E08FD1C8A19744A3ABA7 102213~|~1~|~1~|~01/S<2~|~LAW CR 31 0.90 ER Slide Repair.~|~~|~312F3ED27C957215508A027C8F7EAE74C0846EC6 104082~|~1~|~1~|~01/STR~|~Two-lane resurfacing project. Pavement repair. NOB 146 9.40-18.59. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~DBA57AC06A256061B1AE1A3ED45DC2874786E803 117002~|~1~|~1~|~01/NFP~|~ODNR Project to improve various roads and facilities within Jesse Owens State Park.~|~05 - 4R Maintenance - Resurfacing~|~F93029C5BDE0930EEEB7780472D929E0D76BA8AD 125076~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 83 over Bucks Run~|~10 - Bridge Replacement~|~E47E96AE8620E52CDC4F2E16F0F35F8EB64A86A8 112266~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~5E69335EAD53CD4027535AD8C6AFDFBD690D15B0 94906~|~1~|~1~|~01/ENH~|~Extend Hockhocking-Adena bikeway to Columbus Road in the City of Athens. Approx 2000 ft of paved bikeway. Funded 80 federal/20 local.~|~28 - Facilities for Pedestrians & Bicycles~|~C721AD5AF2C3D0CA0E32CCAFA9A3F877CA4E5F89 117504~|~1~|~1~|~01/BRF/WCEO~|~Replacement of the existing superstructure.~|~13 - Bridge Rehabilitation~|~551280DF83C736EA1D13E0E852B92AAC52ABB630 113802~|~1~|~1~|~01/BRO~|~replacement of SFN 3939308~|~10 - Bridge Replacement~|~318D6E089DD920E38F434D3B0186423B2AB9E83E 95676~|~1~|~1~|~01/NHS~|~LUC-25 from SLM 8.52 to SLM 9.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE854030B78A260E78018F81AF533C5AD0AA452D 95676~|~1~|~2~|~02/NFP~|~This split is for the 100% TWI (Toledo Water Initiative) - 100% City of Toledo funds~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF1D8C42E60D739DF246952531F19DDF487E1BBD 93780~|~1~|~1~|~01/ENH~|~Construction of multi-purpose trail.~|~~|~CBA7540A52E1503519A56758DF4E47AFD767DFF2 112717~|~1~|~1~|~01/IMS~|~Replace approach slabs and convert to semi integral (270, SE side), over Noe Bixby, Refugee Road, 317~|~13 - Bridge Rehabilitation~|~F5B2002BF2E7B3B6890F5112D521CEC564094C03 109440~|~1~|~1~|~01/BRF~|~Bridge replacementBRO CR 62 0.42 (SFN 0833533)~|~10 - Bridge Replacement~|~E7C68D43BABE5140C16B377EEF5C40EB0A50EB6D 115002~|~1~|~1~|~01/STR~|~Radar Detection.~|~44 - Other~|~83790F153562610E90A7ECECF47448D1637BF12E 88701~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~725D7B5656C1A1D2A14FF8D90A69B5909032BD17 81670~|~1~|~1~|~01/NHS~|~NHS roadway: 60-AC overlay w/ repairs~|~05 - 4R Maintenance - Resurfacing~|~C5F421BD379FE9F0A9AD2F68A443100A2D4BDC00 101137~|~1~|~1~|~01/STR/BPOR~|~DSR# BEL-014~|~04 - Reconstruction - No Added Capacity~|~D47217D9C14A71A26BF6DB5C31FF48B63D766AE2 101137~|~1~|~2~|~02/STR/BPOR~|~DSR# BEL-024~|~04 - Reconstruction - No Added Capacity~|~C88C6565082F4EF1968464CAB6FDB3404B008E83 106912~|~1~|~1~|~01/STR~|~Pavement repairs at various locations throughout District 11.~|~05 - 4R Maintenance - Resurfacing~|~EEC41515B895DE59B31E6539A98FEFBF73C21DC5 119729~|~1~|~1~|~01/STR~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~6E23687B04A4A0C2BC3E0CEB6A6358F9B5A6FD1D 114300~|~1~|~1~|~01/SAF~|~All work in this project which is for apply microsurfacing to improve friction along 3 curves~|~21 - Safety~|~879C9E6D13C1AB8ECE2A5EC9BAB5BEABC0600DC2 126125~|~1~|~1~|~01/STR~|~stp rural~|~10 - Bridge Replacement~|~5A503CFC7760097D3E488067E0DE8E09817C558A 124967~|~1~|~1~|~01/SAF~|~Plan split for TAP eligible expenses~|~21 - Safety~|~261F53D870FBC279B9703D9BAC8FB26A8EB1C606 96227~|~1~|~1~|~01/SAF~|~Safety Funded 90/10 4HJ7/4BC7 Ramp Clear program~|~21 - Safety~|~89CA904EE3164AAFA6629C7E63E75978B8066217 112811~|~1~|~1~|~01/NHS~|~Resurfacing SLM 17.42 to SLM 22.40~|~05 - 4R Maintenance - Resurfacing~|~5E2E2610988133E3DB80DF9679974061CA5DCEF8 112811~|~1~|~2~|~02/STR~|~Resurfacing SLM 22.40 to SLM 22.61~|~05 - 4R Maintenance - Resurfacing~|~911AB88039B46715ADEAF968E3AE90223BAF26EC 84458~|~1~|~1~|~01/BRF~|~Cheastnut Ridge Rd SFN 7840373 CR 12 over little yankee run.~|~10 - Bridge Replacement~|~9F6CD42F4900FD331379187382CFE3BC896DA525 106097~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-40-7.70-8.64~|~05 - 4R Maintenance - Resurfacing~|~DC53D19457E3CD089FD5773B3098CD855904C3B2 88301~|~1~|~1~|~01/SAE~|~Crosswalks, Flashers, Sidewalk improvements around Wilson Middle, Fillmore, Garfield, & Harrison Schools in the City of Hamilton~|~21 - Safety~|~47F9525AD7E457BC83AE010B72E894514C8720D1 118845~|~1~|~1~|~01/STR~|~Resurfacing SR 83 in HOL and TUS~|~05 - 4R Maintenance - Resurfacing~|~37F06A53C681447D2A7BC1AB6B15CBCA68ECAAD3 103737~|~1~|~1~|~01/ENH~|~SRTS~|~28 - Facilities for Pedestrians & Bicycles~|~A96F6EE991AC762EEB4860A0E97F190558A2BE35 106142~|~1~|~1~|~01/STR~|~Reconstruction of overhead flashers at SR-5 & SR-193, SR-45 & SR-87 and SR-82 & SR-534.~|~21 - Safety~|~D5AF15A606CBD9F92427D2F8C129B2DFD39BCEBC 86684~|~1~|~2~|~02/STR~|~Overlay asphalitic concrete on CHP CR 468 0.00 to 1.00.~|~05 - 4R Maintenance - Resurfacing~|~3BAC063C72D9FD7E144F4784919F39AFCCBEB5CC 86684~|~1~|~1~|~01/NFA~|~Overlay asphalitic concrete on: CHP-CR-223 CCHPCR00223**C CHP-CR-223 0.030 to 1.760 CHP-CR-25 CCHPCR00025**C CHP-CR-25 6.660 to 8.640 CHP-CR-95 CCHPCR00095**C CHP-CR-95 1.010 to 3.030 CHP-CR-97 CCHPCR00097**C CHP-CR-97 0.000 to 1.980 CHP-CR-9 CCHPCR00009**C CHP-CR-9 0.000 to 2.350 CHP-CR-10 CCHPCR00010**C CHP-CR-10 4.250 to 6.010~|~05 - 4R Maintenance - Resurfacing~|~8439D65C3CDC02F8D3764A6032E592B10A0C0FD7 86684~|~1~|~3~|~03/S<2~|~Overlay asphaltic concrete on 17.55 miles of country roads. This split pertains to CHP-CR-16 6.040 to 6.210. Major Collector - Urbana.~|~05 - 4R Maintenance - Resurfacing~|~D3821AD741D6D6F556854F2FF89C3C2C1A79FDFE 123598~|~1~|~1~|~01/SAF~|~Safety and speed management improvements along Washington St. ~|~21 - Safety~|~51C25B2A0949D72B355646A0B851F0BFF8EA4FAC 110014~|~1~|~1~|~01/S5K~|~Work on the Small Urban portion of CLI-73 ~|~05 - 4R Maintenance - Resurfacing~|~9F70818EF44AB6B870F15CA82B8AE9437DDDDC0A 110014~|~1~|~2~|~02/NHS~|~work on the NHS portion of CLI-73~|~05 - 4R Maintenance - Resurfacing~|~B28FC7579421BFD31139CBE60F278A8BA2FDFB44 114632~|~1~|~1~|~01/STR~|~Overlay on SCI 125.~|~05 - 4R Maintenance - Resurfacing~|~563EFF6349FDB5E58D65864EEA17AF465740E189 109413~|~1~|~1~|~01/CMQ~|~work to interconnect and upgrade the signals along Cedar Rd, Warrensville Center Rd, and Green Rd that is eligible for federal-aid~|~21 - Safety~|~3CB82711C32D62CCE1659721E09D1DE6E77AC16E 126664~|~1~|~1~|~01/NFA~|~Created for J&C involvement. ~|~44 - Other~|~5A51E38DDFC9D30F80DEE3A23A9976C50351EAB8 23262~|~1~|~1~|~01/ENH~|~?01/ENH/OT/SCPD? ? Construct bike/ped trail from SR 212 in Stark Co across the Tuscarawas River into Tuscarawas Co. Project length ~ 2100? includes bridge to carry the multi-use Ohio & Erie Towpath Trail over the Tuscarawas River. Earmarks: OH223, TC0401 and TC0908.~|~28 - Facilities for Pedestrians & Bicycles~|~52342DA1FDA60E71CBE7ECEFC315A4F3C5BC5679 96015~|~1~|~1~|~01/S>2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation on 1) FAI-SR 204-3.46 SFN 2302616; Intersect: Sycamore Creek; BR Eligible: L=93, SD/FO (2), SR = 64.2, DSR = 6; 2) FAI-SR 204-4.32 SFN 2302640; Intersect: Trib. of Sycamore Creek; BR Eligible: L=93, SD/FO (2), SR = 63.2, DSR = 5~|~10 - Bridge Replacement~|~B2D532563E1135B67C5404CB1FEDA14E09E86F24 96015~|~1~|~2~|~02/S>2~|~District Preservation - 4PS7 (100% State) - No CAP - Funding to Cover repairs~|~04 - Reconstruction - No Added Capacity~|~61F191AE487F7CE89830B827A94CB765D2E5368D 120980~|~1~|~1~|~01/S>2~|~Plan Split for TBD routes~|~05 - 4R Maintenance - Resurfacing~|~C7379481071D78916AFAF15950A5CF6471E58D4F 84526~|~1~|~1~|~01/S<2~|~Resurfacing~|~~|~53F8601190218CAC53895EF107C6BB6DB0CAB8CF 120920~|~1~|~1~|~01/NFP~|~Plan split for electrical maintenance work~|~47 - Bridge Preventive Maintenance~|~D9E46FA0ED25D76597E4BC5E965D5EFBD094408F 120920~|~1~|~2~|~02/BRO~|~Plan split for wire rope replacement and motor refurbishment for pylon internal elevators~|~47 - Bridge Preventive Maintenance~|~615A76D7964B65D7339AE6B2CE8BBE2130A81D75 119091~|~1~|~1~|~01/NHS~|~ATH-50-33.38-39.04 ~|~05 - 4R Maintenance - Resurfacing~|~424ECB92C40789F1ABC4D03F1B84C87C8517B669 118823~|~1~|~1~|~01/BRO~|~Replacement of bridge carrying SR 148 over an unnamed tributary of Captina Creek~|~04 - Reconstruction - No Added Capacity~|~7A62FA358776A9274CF73F69E73704D685F8D56D 124905~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2032.~|~21 - Safety~|~B9C84F37B7BC6625F81A264517FCB8A8451DAC20 101235~|~1~|~1~|~01/STR~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on OFAH-Rural routes~|~21 - Safety~|~C15D0A35A1538905151B0231784B4175A5908E14 101235~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - Safety funded cable barrier installation along IR 70 in GUE County (SLM 23.3 - 25.3). ~|~21 - Safety~|~9DDAD3379746F999BECEA593E30054761173DF70 101235~|~1~|~2~|~02/S5K~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on OFAH-Urban routes~|~21 - Safety~|~F187F4BF6363FAC78AF2858DB6A317937021B414 109959~|~1~|~1~|~01/SAE~|~Guardrail installation and upgrades on various county roads in Clinton County.~|~21 - Safety~|~3622C9CC564D48EE02915F13DFF07E30BAA2C99B 95680~|~1~|~1~|~01/MPO~|~Multi-Use path~|~01 - New Construction~|~4F518E3F05340C9EB49A5D4542592A1976752B60 103074~|~1~|~1~|~01/S>2~|~Mill and resurfacing on STP route~|~05 - 4R Maintenance - Resurfacing~|~B6A54E58EC2CE2B5BF3CFE3C00CC66FB4446427C 94277~|~1~|~1~|~01/MPO~|~Resurfacing of County Route 133 from SLM 2.38 to SLM 4.68, in the City of Green, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~BC6B5366B5E7362A80BFCDD3AEE9884DC4D8CD09 123828~|~1~|~1~|~01/SAE~|~Intersection improvements.~|~21 - Safety~|~59D78819B43BE2E75BD7847265EBDBA080F46E35 99632~|~1~|~1~|~01/STR~|~Reusrfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~9AC41A10D4133A4C72F1D2E9B21A1AE6E33ED9BA 106764~|~1~|~1~|~01/BRO~|~Replacing existing deck on CAR-43-2347 (SFN 1000969) with new reinforced concrete deck made composite with the existing beams, supported by existing piers and new abutments.~|~13 - Bridge Rehabilitation~|~5A2448117459C704527FCACB0D7D07B67A63DD71 84299~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~F07C3BE38C99001BF2913C371492B2425B53463C 84299~|~1~|~2~|~02/STR~|~Split 2 for work to repair the slide damage.~|~44 - Other~|~491C73927A03EEEF28671D1BF3677D2E124FCFDF 111628~|~1~|~1~|~01/NFP~|~2 year lighting contract in ATB, MAH and TRU counties.~|~21 - Safety~|~6CA9B73D8BEA8684A4EAF0EC828D58B1E9D497EA 103991~|~1~|~1~|~01/BRO~|~Split for bridge deck replacement~|~13 - Bridge Rehabilitation~|~03EAFADDBFAAC5E1DBF8ED454F87D7560B467329 101094~|~1~|~1~|~01/STR~|~Microsurface various routes in Darke County: DAR SR 185 SLM 6.56 to 11.78 = = DAR SR 121 SLM 5.80 to 14.01~|~05 - 4R Maintenance - Resurfacing~|~1155389E4ACCD4313B868C1B10CF478680D1EC11 101094~|~1~|~2~|~02/NHS~|~Microsurface various routes in Darke county: DAR SR 571 SLM 0.65 to 6.73~|~05 - 4R Maintenance - Resurfacing~|~24189B80A7E39D9C1D2E40D9C81118F3569C4F5C 101094~|~1~|~3~|~03/S<2~|~Microsurface various routes in Darke County: DAR SR 121 SLM 14.01 to 15.21~|~05 - 4R Maintenance - Resurfacing~|~0F6182350915F106524D5894395E8AFEDCC0ACDE 101529~|~1~|~1~|~01/STR~|~DSR# TUS-004.~|~04 - Reconstruction - No Added Capacity~|~E136F6C07804B8B1DC1D994567E9AD19563614FB 107015~|~1~|~1~|~01/NFA~|~New Entrance to the Ohio State University Mansfield Campus and North Central State College off Lexington-Springmill Road.~|~01 - New Construction~|~5C1BA3F74F93EDF3BD0D6EC3E29B0DCDE39B9A43 113608~|~1~|~1~|~01/SAF~|~Installation of new pedestrian crosswalks at two locations within the Village of West Liberty.~|~43 - Utilities~|~CD2B5623A50FDC12F716EECC869CF5EA4D8F0D35 97016~|~1~|~1~|~01/NFP~|~Pavement markings~|~44 - Other~|~FB5CD6165AC1C4459D227A894AEDC7AB8D3A6874 108468~|~1~|~1~|~01/MPO~|~Resurfacing CR 17 from 0.4 miles north of Minor Rd to Ridgewood Rd (south intersection).~|~~|~C6A755F9E658D9A605210A82E19E2428361A3220 112435~|~1~|~1~|~01/STR~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~A14FCA984011D4BE9A1555C45109958F43EA10AD 112435~|~1~|~2~|~02/S5K~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~DCA50F708A3C9AD226EC0D196429878463ACB376 99857~|~1~|~1~|~01/S<2~|~Replace bridge deck~|~~|~81F6E95817190271A69C19D2A598F19F38960D5A 100689~|~1~|~1~|~01/NHS~|~Remove and repair concrete bump-outs above and below the City of Marysville lettering on structure UNI-4-13.20 (8000093). Seal concrete area.~|~13 - Bridge Rehabilitation~|~1F6D2E8BAC8FCC193A79A18AE9BA28024AA6BB09 100689~|~1~|~2~|~02/IMS~|~All bridge work on FRA-71 Bridges~|~13 - Bridge Rehabilitation~|~A749DF4FA5E2FCC543F3662A5E07CE951BA82BB5 97127~|~1~|~1~|~01/SAF~|~Roundabout at Sylvania/Centennial~|~04 - Reconstruction - No Added Capacity~|~CC9947BDC8DFE23800F4D636B53D33CDBB379C0F 115017~|~1~|~1~|~01/SAE~|~Construct new traffic signal at the intersection of US 224 and Township Road 237. 100% federal funds from the District Preservation Program budget. ~|~21 - Safety~|~5CC36FC250BA030198C9FCF8551F0AB6174FF595 88223~|~1~|~1~|~01/MPO~|~Construct concrete curb and gutter, storm drainage and sidewalk. Widen pavement to accommodate the addition of Bike Lanes on both sides of the road on Wolf Creek Pike from Little Richmond Road to SR 49 connector. Bridge modifications are required to accommodate the sidewalk and bikeway as well as modifications needed at the Railroad Crossing. Pavement markings will be brought up to standard and bike lane markings included.~|~28 - Facilities for Pedestrians & Bicycles~|~3A11098045EBAC9EBDB5A91E18B03F6BAF539C07 106926~|~1~|~1~|~01/BRO~|~Replace existing bridge (CAR-542-1263, SFN 1002074) with new composite boxbeam bridge.~|~10 - Bridge Replacement~|~05B387179FF0123965D25C5E11F3ECF344453245 91033~|~1~|~1~|~01/S>2~|~Resurfacing of Ohio Avenue (CR-351).~|~05 - 4R Maintenance - Resurfacing~|~03C53267DFB9E38554B832A2E587D5B21D75E172 112938~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-70-11.21-11.98~|~05 - 4R Maintenance - Resurfacing~|~F2332B9C56BD50EC878A0846E15418C3CEBB76E8 106369~|~1~|~1~|~01/STR~|~Remove and replace culverts on rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3DCDD37BFC55CC72795154F103195AFF5C1F9E61 96885~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~BC0CD038F2D7A079145EDA21D61C90FD565BD7F3 96885~|~1~|~2~|~02/BRF~|~100% local items~|~17 - Construction Engineering~|~0DC983FB607E67C2C656E17F4D3C3E17192E0ABE 96885~|~1~|~3~|~03/BRF~|~100% Local Project Costs~|~~|~3D7D3069515D0104CA3CD5709263594EE81D27CD 102384~|~1~|~2~|~02/S<2~|~SCI 73 25.85-26.47~|~05 - 4R Maintenance - Resurfacing~|~924B1B1EE69E5EC2C252DF0820432D67A053877C 102384~|~1~|~3~|~03/NHS~|~100% Local for curb & full depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~88652DDCAA833EACC9CFC06D8A602941B032E20B 102384~|~1~|~1~|~01/NHS~|~SCI 23D 0.00-1.03SCI 23R 0.45-2.680/20 Federal/Local~|~05 - 4R Maintenance - Resurfacing~|~C23FCF66FB716FD81BBA52FD506AED815E4EEC28 102384~|~1~|~4~|~04/NHS~|~SCI 23 2.60-2.67 80/20 Federal/State~|~17 - Construction Engineering~|~9D97B057EDC645C20255B4B97F0C9C84DF7DD1EB 102384~|~1~|~5~|~05/NHS~|~Bridge maintenance SCI 23 1.90 (SFN 7300042)~|~47 - Bridge Preventive Maintenance~|~CAE91C4CFB43D4E1ADCB938272B232F9062795B4 102384~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~921A099348E4552F0438A0EFE8AC5E6B5E6A7FAC 110596~|~1~|~1~|~01/NHS~|~plan split for signal upgrades and added radar on the NHS route, CLE-125~|~21 - Safety~|~B686017A78C9455165856505AD3C36F18668C4B3 110596~|~1~|~2~|~02/S>2~|~plan split for signal upgrades and added radar on Lg Urban Routes, HAM-22 + WAR-22.~|~21 - Safety~|~A1C03ECD2BB84461FB0843EC9B8E853E2CA77A01 110596~|~1~|~3~|~03/SAF~|~Ramp meter improvements HAM-75NB at Mitchell.~|~21 - Safety~|~F18B6BD06EE1D673E94BE1FE8DACCEB0EA6CD0A9 110596~|~1~|~4~|~04/SAF~|~Install Flashing Yellow Arrow (FYA) on US-22.~|~21 - Safety~|~4557BC8F6C419C1EAEFEEB1C4F9F086DCC2A34F4 104002~|~1~|~1~|~01/STR~|~Pavement work in the Village of Arlington including full depth repair. All funds are from the District Preservation Program. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. There are no local funds in this split.~|~04 - Reconstruction - No Added Capacity~|~F9ACC067A21F4ADF097BD1C1F4F9086C3E9F874A 104002~|~1~|~2~|~02/NFP/ARL~|~Non pavement work in the Village of Arlington including curb and gutter, drive approaches and storm drainage. This work in the responsibility of the Village of Arlington to pay for. Funding from the Ohio Public Works Commission (OPWC). Any funding needed over the OPWC funds are the responsibility of the Village.~|~04 - Reconstruction - No Added Capacity~|~436BFA36EEACB9967123AEE8B2453DE036A2B10F 116804~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~FEEAEE426B1ED7DC6896A7B1B571CDEA894493B5 116804~|~1~|~2~|~02/S>2/AKRO~|~Full and Partial Depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~9D7B29CA2E222D2C2A07AC8D43E85953EF2DFA39 92073~|~1~|~1~|~01/NFP~|~Lexington Outpost Salt Building Repair~|~44 - Other~|~7270BBD33BA8FA43D4D7FD02BABDC47B1864CF9E 84964~|~1~|~1~|~01/S<2~|~Brdg replacement. 7303513 SCI SR139 1.73 Intersect: StreamOn SR139. 0.22 mile north east of Portsmouth corporation limit. 80 Fed/20 State. 01/S<2/BR/State~|~04 - Reconstruction - No Added Capacity~|~FCF3D5F911C2EA254D22D4C19B40C19C6ED1B11B 106548~|~1~|~1~|~01/NHS~|~Improvements at the US 62/Stygler Rd and Stygler Rd/Agler rd intersections~|~03 - Reconstruction - Added Capacity~|~70D1BB9AD33B9566E6289152BFA983272C13A3F9 106548~|~1~|~2~|~02/NFP~|~Created for ODOT TID funding. ~|~~|~3EAF095E088EE3DFA8DF713E5299A92AB76C9F50 97448~|~1~|~1~|~01/NFA~|~Resurfacing of West Golf Drive from Mill Creek Park Golf Course Parking Lot to Shields Road.~|~05 - 4R Maintenance - Resurfacing~|~576E7B12864493D881BA7C51FAFEA25563B373BE 126011~|~1~|~1~|~01/S>2~|~Bridge replacement of FRA-CR124-6.11~|~10 - Bridge Replacement~|~5EF6B66C8D0F92E01A03680C1B4BBE09E8069FB3 117965~|~1~|~1~|~01/SAF~|~Safety funding eligible work~|~21 - Safety~|~05DE763FB3E3E58D7FEC8A0BE3AB829D09F9A56B 109691~|~1~|~1~|~01/NHS~|~Resurfacing SR 11~|~05 - 4R Maintenance - Resurfacing~|~FED72E95BE78FE5F34EA0A48FB5F03277ECA24E7 121961~|~1~|~1~|~01/SAF~|~Plan split for all roundabout work at US-6 & CR-24~|~21 - Safety~|~FBC2D6DE345B7D0F627F55142A406080B054F32B 85149~|~1~|~2~|~02/BRO~|~City of Westlake requested anti-graffiti features for the concrete sealer and has agreed to pay 100% of the cost above that normal (epoxy urethane) concrete sealer.~|~~|~2258B5A493ADEFF5BC17E340EB6DDDBFA08C7207 85149~|~1~|~1~|~01/BRO~|~Superstructure replacement for SFN 1810499 (CUY-254-0449) over Sperry Creeak approximately 0.86 mile east of SR-252.~|~13 - Bridge Rehabilitation~|~DBEBB47DFF5EA06DEE6174B6F968EE2CFDA6995C 118150~|~1~|~1~|~01/S50~|~Landslide repair by drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AFC739F7B6B2AB78650D1ADB683A2B6BD69ED319 81086~|~1~|~1~|~01/S<2~|~Resurfacing in London urban area and general system (fed/state) pavingMAD-56: 8.46-8.4801/S<2/PV/~|~05 - 4R Maintenance - Resurfacing~|~11B6A2272CD1D9540F2CFE3513FA3FF479133DB0 81086~|~1~|~3~|~03/STR~|~Bridge work (at 80/20, not BR elig) - asphalt OL and patching, sealing4901819 MAD SR56 11.77 Intersect: Oak Run4901843 MAD SR56 12.23 Intersect: Walnut Run4901983 MAD SR56 20.61 Intersect: Sugar Run4902041 MAD SR56 23.98 Intersect: Deer Creek03/STR/BR/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~21B14E9E2A1EBC5535E231CD51BC0E7266A6D17A 81086~|~1~|~2~|~02/STR~|~Resurfacing in rural area and general system (fed/state) pavingMAD-56: 8.48-24.3502/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~7017276524073152EC2EFA395DCB5194E5B84E87 81086~|~1~|~4~|~04/IMS~|~Bridge work (non BR) on 1 structure:4901959, MAD-56-20.01, over I-71~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7C30414EDC4E38B818CD25F305B761C6001CAF75 81086~|~1~|~5~|~05/STR~|~Pavement markings / RPMs~|~05 - 4R Maintenance - Resurfacing~|~82A09D4F7D830E4E59A2DECBE30D5BC034E75B48 94116~|~1~|~2~|~02/IMS~|~Minor Bridge work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~6CC739F3D12893E250A46041F403DB1750D4B491 94116~|~1~|~4~|~04/S>2~|~Minor bridge work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~F8B190806F330FFCDDAF031304B0228FC9881EB6 94116~|~1~|~3~|~03/NHS~|~Minor bridge work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~69A4404E325A046801A2BA03E2E61CEC03E04D01 94116~|~1~|~5~|~05/S>2~|~Minor bridge work to linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~05F4A7512909F4C9B50D5CC1DC98ABE5ACE76DA0 94116~|~1~|~1~|~01/S>2~|~Resurfacing TRU SR 304 1.03 to 5.88.~|~05 - 4R Maintenance - Resurfacing~|~2A13EE1DE2BAF5EBC5A75A2C663D327E974C1681 99195~|~1~|~1~|~01/NFA~|~Ross County various routes guardrail.~|~21 - Safety~|~DBC1733CC8B6A1E84FD434A30E5674D9D15F9E40 25192~|~1~|~3~|~03/STR~|~"03/STR/OT/ " - District Preservation 4MP7(100% State) - No CAP - Pavement Markings on 1) FAI SR256 14.18-24.63; 2) PER SR256 0-0.16~|~05 - 4R Maintenance - Resurfacing~|~121DDDF529EAEA636550A3AC5CBE0384B07832FC 25192~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on PER SR188 0-4.48~|~05 - 4R Maintenance - Resurfacing~|~53C985298C3C370B70CCF538ACE911BC9165B35E 25192~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI SR256 14.18-24.63; 2) PER SR256 0-0.16~|~05 - 4R Maintenance - Resurfacing~|~BBE0DACCE1B2BDBE97A16009728514C1ED810BC0 25192~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation 4MP7(100% State) - No CAP - Pavement Markings on PER SR188 0-4.48~|~05 - 4R Maintenance - Resurfacing~|~BFB3D80C18F3C00197184FF557CB9D2E0C40551E 112739~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to UNI-33-8.79 L/R~|~~|~1EE01B37EFE6848E1C541ED2DC41CA93F64ED6B6 97718~|~1~|~1~|~01/MPO~|~Resurface Clardon Troy Road using 80% federal MPO STP funds matched w/20% Local funds.~|~05 - 4R Maintenance - Resurfacing~|~0EDB7CBA311CC8CDBA2FF818B769EB6BFDF0B018 92744~|~1~|~1~|~01/NHS~|~Rockscaling on MEG 33 4.48, 6.04, 6.07, 6.30, 6.45, 7.21, 7.32, 7.61, and 9.36. GSM funded projects. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C7FCE015F3223BB865E9F69F9AD0577D5B0DC8C 125026~|~1~|~1~|~01/IMS~|~Addition of a third lane in each direction and reconstruction of existing lanes~|~03 - Reconstruction - Added Capacity~|~9F0410EC87A54FB92E2F99091BAFE704E4E7FB86 89407~|~1~|~1~|~01/S<2~|~Landslide repair using GSM Funds. Work Length approximately 400 ft. GAL 160 1.27. Federal/State 80/20%.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~84B74B6E9B9C5F61926333D7DCA4C2026B79147B 126334~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~FC93ED377161390E548D5912198E81484554B6EA 110098~|~1~|~1~|~01/NFP~|~Pavement marking plan split~|~21 - Safety~|~3F46CA20AD0AA5F76D5CFFDDD7C05107A04C6845 100361~|~1~|~2~|~02/STR~|~Overlay SR 49A with asphalt concreteDAR SR 49A 0.00 to 1.84DAR SR 49A 2.87 to 4.09~|~05 - 4R Maintenance - Resurfacing~|~8FA26A1BD706716AAE175E44F6BEBE4CB7A6C40F 100361~|~1~|~1~|~01/NHS~|~Overlay SR 49 with asphalt concreteDAR SR 49 8.92 to 12.22~|~05 - 4R Maintenance - Resurfacing~|~BEEC6884E7EA4ADBD6546D00D8621D1C34792ACF 101118~|~1~|~1~|~01/STR~|~DSR# BEL-011~|~04 - Reconstruction - No Added Capacity~|~D990ED8E81F9433FBB3B2CB65FEBEC16D7A428BE 120735~|~1~|~1~|~01/SAF~|~Roadway profile improvement along SR 158~|~21 - Safety~|~122638696DC58020CD713802CFFB91A9EA396C24 120735~|~2~|~2~|~02/STR~|~Resurfacing after intersection improvement.~|~05 - 4R Maintenance - Resurfacing~|~A836645ED9CEC81B356DB856A9D7E1E35939FC0B 94184~|~1~|~1~|~01/NHS~|~US 250 southbound right turn lane onto Westwind Drive~|~21 - Safety~|~3B32BDF25CFBAE8CD8D2E810FA7AB2B398562347 82882~|~1~|~1~|~01/NFA~|~BRO CR13 Covered Brdg Replace 0833126 BRO CR13 3.14 Intersect: Eagle CreekCEAOBRO CR13 3.01 (SFN 0833188)On CR13 (North Pole Road), 3.3 miles from US68, it is proposed to construct a new bridge beside the old covered bridge and leave the old covered bridge in place. SFN 833126. 80 Fed/20 Local Match by Brown County01/NFA/BR/Brown~|~10 - Bridge Replacement~|~E0AAA99FC8F71CC9A0C55725D01128E5296A71FC 102789~|~1~|~1~|~01/S>2~|~This plan split is for work on NHS bridges.~|~13 - Bridge Rehabilitation~|~F0FAFA367157CFF128AD16ACC3CB67411C577855 112801~|~1~|~1~|~01/STR~|~Rural Plan Split: MAD-142-11.21-13.34 MAD-142I-0.00-0.20~|~05 - 4R Maintenance - Resurfacing~|~61F7A6BC3DF856E5BF615BBF486628D0C6C0EEC9 82420~|~1~|~4~|~04/NFP/AT&T~|~Plan Split for removal of AT&T lines from bridge. Responsibility of the utility.~|~43 - Utilities~|~0EB05D4F6E163092A6EA09C557F7D32437FBA9A0 82420~|~1~|~5~|~05/NFP/OE~|~Ohio Edison to abandon underground electric and pull boxes.~|~43 - Utilities~|~3C31E8A891A97FC30AB4F3C2EA0FD2C72F780CCD 82420~|~1~|~1~|~01/BRO~|~Plan Split for SFN 7839758 TRU Olive Street Bridge over the Mahoning River and Railroads~|~10 - Bridge Replacement~|~7647466EF0018D37BB090EE4370600E1A0AEC9C3 82420~|~1~|~3~|~03/NFP/DEOG~|~Plan Split for removal of gas line from bridge. Responsibility of Dominion East Ohio Gas company.~|~43 - Utilities~|~BDA832BAA25B2B2C2259E785E70AB4F842767116 82420~|~1~|~2~|~02/NFP/McDn~|~Plan Split for removal of Sanitary Sewer from bridge. Responsibility of the Village of McDonald.~|~43 - Utilities~|~CDDFF0067516F48CC1906AB983645BBAA4C75E8D 108381~|~1~|~1~|~01/NFA~|~Landslide repair project. VIN 328 6.20-6.24.~|~17 - Construction Engineering~|~51F8D8D43EEC3B7D2A4A7B0593CDC2F4C0DA9A4F 97577~|~1~|~1~|~01/S<2~|~Mill wheel rutting out of the pavement and resurface GAL CR 35 2.44-4.21. Project also includes increasing the pavement friction; installing edgelines, centerlines, and delineators; and upgrading the roadway signs. Urban other federal aid funded 80 federal/20 local.~|~21 - Safety~|~7CEC310ECD6ADFCEE0673275FB0A0F51D6B033EC 123410~|~1~|~1~|~01/SAF~|~Safety and Speed Management Improvements~|~21 - Safety~|~E7D14F025C4F903B1CDE876394DE25B3A585F7CD 101693~|~1~|~1~|~01/S<2~|~STP 80/20 District Allocation/City of Bucyrus~|~05 - 4R Maintenance - Resurfacing~|~E6F95A5DFFFF983596B1E2DC54519B4A1980E661 101693~|~1~|~2~|~02/S<2~|~STP 100% City of Bucyrus~|~05 - 4R Maintenance - Resurfacing~|~0E3754275D251D42772629F9C89E0BD9B25FA134 101693~|~1~|~3~|~03/S<2~|~STP 80/20 District Allocation~|~05 - 4R Maintenance - Resurfacing~|~5556CEBF7C4B3CA729E4EA7BD8C9D28BDC5C4656 105693~|~1~|~1~|~01/STR~|~Apply herbicides along the roadside for weed control on 4 lanes.~|~44 - Other~|~A3165786A3E8128848170D0DAC4086585F32CF80 103331~|~1~|~1~|~01/NHS~|~Mill and fill on NHS Route - Urban Paving.~|~05 - 4R Maintenance - Resurfacing~|~1CDFA4DB76CC50A7839A28135ABFC57FF8013A50 118773~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~EE2EEA7F0A8DBEB4DEDE43A638304CBEA952CA1B 121845~|~1~|~1~|~01/MPO~|~resurfacing SR 835 from US 35 eastbound off ramp to US 35 flyover~|~05 - 4R Maintenance - Resurfacing~|~98C478A9ECD56D8C67EF94C8A202EDCBDFE8571F 105934~|~1~|~1~|~01/MPO~|~repair and resurface work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~477DFE3C85F3BFC75452F2DE357E00CECD8626AB 99791~|~1~|~1~|~01/STR~|~Slide repair and lighting repair.~|~44 - Other~|~33F6A6A3FB08BA8F3502BDC0F95BE2596C88607C 108772~|~1~|~1~|~01/S<2~|~All work in this project.~|~05 - 4R Maintenance - Resurfacing~|~08275B67B46C95B4EFC1CE05059D93C42AB36E77 109966~|~1~|~1~|~01/BRF~|~Replacement of the superstructure of Bridge No CLI-CR 6-4.86 (SFN: 1430947).~|~13 - Bridge Rehabilitation~|~0B4421BDF6AEFA1F0B8E080CAC58C2498FC8072E 103393~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ED399CF432C1667DC445B005A075AC00C5869CA2 87032~|~1~|~6~|~06/SAF~|~Add dilemma zone protection to 20 signalized high speed intersections.~|~21 - Safety~|~10AFB718E8630E9920E26B26E727F214BD47443F 87032~|~1~|~1~|~01/NHS~|~Install by contract traffic signals at various locations. This plan split will include BUT-SR-4 15.52 to 13.90 (PC - N P 16885)~|~21 - Safety~|~97CCE80CACE0EBB8F49BB1E8F521E22814F0CCBB 87032~|~1~|~2~|~02/IMS~|~Install by contract traffic signals at various locations. Thsi plan split will include CLI-IR-71 2.90 to 3.00 (PS - I F 99999)~|~21 - Safety~|~7B662E7A41857DC41926395D0A3DCB441EB29886 87032~|~1~|~5~|~05/S<2~|~Install by contract traffic signals at various locations. This plan split will include BUT-SR-73 18.08 to 18.09 (PC - O M 56926)~|~21 - Safety~|~57586085155B0E4163D5D56941D89A5DF9B0C559 87032~|~1~|~3~|~03/STR~|~Install by contract traffic signals at various locations for FY2015-2016. This Plan Split is for the Rural Locations. This plan split includes BUT-SR-73 4.37 to 4.38 (PC - O M 99999)~|~21 - Safety~|~7181238373D73091D8E8A55899DB0D2CD041570C 87032~|~1~|~4~|~04/S>2~|~Install by contract traffic signals at various locations for FY2015-2016. This Plan Split is for the Urban Locations. This plan split includes BUT-SR-63 2.00 to 2.01 (PC - O C 16885)~|~21 - Safety~|~71C97D9DAD1E07A419F03A88B1B2B0EEEDC81997 107489~|~1~|~1~|~01/CMQ~|~CMAQ Plan split~|~04 - Reconstruction - No Added Capacity~|~16CE4A11662CF3C43544E9C25E775FE4EBD01524 107489~|~2~|~2~|~02/BRF~|~Structural replacement~|~10 - Bridge Replacement~|~27A62E298F5E441EA10C9369B0B19B0BBD5E432F 107489~|~2~|~3~|~03/NFP~|~100% Local upgrades within bridge project.~|~44 - Other~|~508A059D61231F6B2114FFE2D3F9AB4E345F48C4 114529~|~1~|~1~|~01/STR~|~Bridge replacement.~|~10 - Bridge Replacement~|~7E55B74B4041D2A8CCCD941076A2A0AE86A7232F 98575~|~1~|~2~|~02/NHS~|~100% Local (Vermilion): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): LOR-6-0.00 to 03.36~|~05 - 4R Maintenance - Resurfacing~|~5FD9907C6104C21AB98A97FF2289063F7DE8774C 98575~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% (Vermilion) Urbanized Area Inside Corp. Limit (Paving Items): LOR-6-0.00 to 3.36.Priority 1 100% 4BG7 is for alternate bid pavement marking items if the city agrees to them.~|~05 - 4R Maintenance - Resurfacing~|~C6F141491110C7110BC33656241A51F020224E7D 107848~|~1~|~1~|~01/STR~|~Rural Plan Split: UNI-736-0.00-7.55 MAD-38-22.47-22.72 MAD-323-4.00-18.66 MAD-656-4.87-5.38 MRW-746-0.00-0.65 UNI-37-0.00-5.30 UNI-38-0.00-0.08~|~05 - 4R Maintenance - Resurfacing~|~4882922DFB3A03774C0026B4E14F5BAEA5321EF0 107848~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: UNI-736-7.55-7.91~|~05 - 4R Maintenance - Resurfacing~|~AACCB54CE55DF322B6E9B46BB003D10250728F96 107848~|~1~|~3~|~03/NFA~|~Rural (not on federal aid system): MRW-746-0.65-3.08~|~05 - 4R Maintenance - Resurfacing~|~830EBCE8407A577C0BCB4DE3FC28485A108AF064 119340~|~1~|~1~|~01/IMS~|~Plan Split for Concrete Spot Repairs - locations still to be determined~|~05 - 4R Maintenance - Resurfacing~|~66EADDB55ACDD4694F4DA26D38B2A6E5836DEF06 112605~|~1~|~1~|~01/ENH~|~Adding sidewalks to TRU SR 45 from Bane St SW to 6th St SW in Warren Township.~|~28 - Facilities for Pedestrians & Bicycles~|~0E708C07614F3CCB91520E86D882099F10C517CF 88460~|~1~|~1~|~01/STR~|~improve intersection sight distance by eliminating guardrail, enclosing ditch at SEN CR592 2.77-2.78 and SEN SR12 3.97-3.98.~|~21 - Safety~|~E0E4F98E7A03B5CCBC842EDD1FCC7843305A01FC 91462~|~1~|~1~|~01/STR~|~Rural resurfacing of FAY 435: 0-0.97 & 2.37-4.0801/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~247E8A407B816068D9DC1FD05609A868C6DFD899 99979~|~1~|~1~|~01/STR~|~Resufacing STA-US 62 from 0.93 to 3.96.~|~05 - 4R Maintenance - Resurfacing~|~933160E5BB867DFEDCC874F752E664419CA41949 99979~|~1~|~2~|~02/STR~|~Minor Bridge work to SFN 7601891 STA-US 62-3.97 structure over Branch of Middle Fork~|~13 - Bridge Rehabilitation~|~5CC5870E0C63D6C8E2260FEBBA5ADDF77E8D9139 101282~|~1~|~1~|~01/NHS~|~Plan split for resurfacing US-224~|~05 - 4R Maintenance - Resurfacing~|~846F5D6D4714D582CE6A073727C9D3A8279614EB 101282~|~1~|~2~|~02/STR~|~Plan split for resurfacing SR-67~|~05 - 4R Maintenance - Resurfacing~|~B9DA7C9DE797DEC2DA1E6D65FF59CD13709C3A8A 111540~|~1~|~1~|~01/NHS~|~1-1/2" mill and fill with superpave asphalt~|~05 - 4R Maintenance - Resurfacing~|~F8A7027264235F686A8A54F1750BB8C98C3E3B03 99958~|~1~|~1~|~01/NFP~|~Road improvements to support new Fuyao Glass facility.~|~01 - New Construction~|~AFE90BF4F21F889E6B78DB90DF31128A0D33967E 96994~|~1~|~1~|~01/STR~|~District wide herbicidal spray project~|~44 - Other~|~7A003D5A27F9D33C745E226816DA895A6723B32A 94749~|~1~|~1~|~01/SAF~|~Upgrade signals at the following locations: CLE-125-1.65 @ Brandychase; CLE-125-2.79 @ bennett; GRE-675-10.34 N. Fairfield & SB IR-675 entrance; HAM-71-11.81 Kennwood & NB IR-71 exit; HAM-128-5.67 @ Harrison; HAM-264-7.6 @ Virginia; HAM-27-11.43 @ Galbraith; HAM-27-11.63 @ Colerain Crossing/McDonalds; HAM-27-13.51 @ Springdale; WAR-22-5.37 @ SR-48~|~21 - Safety~|~0685DE4EB0BE406458F3BEF97035FA3B09D7F648 102303~|~1~|~1~|~01/IMS~|~This plan split is for steel superstructure painting and sealing necessary concrete surfaces on Interstate Bridges.~|~13 - Bridge Rehabilitation~|~0DCE8B115E7D77324B26AB0142ED0BE273C3ACC3 102303~|~1~|~2~|~02/NHS~|~This plan split is for steel superstructure painting and sealing necessary concrete surfaces on NHS Bridges.~|~13 - Bridge Rehabilitation~|~DAB9CE8F62B635D10201C4707BE9B422E84FD513 102303~|~1~|~3~|~03/IMS~|~Work was performed on permanent item that was damaged by an accident~|~13 - Bridge Rehabilitation~|~28979E9A037D4396273DBCD3EF4A3888FD4BC447 96126~|~1~|~1~|~01/NFA~|~Construct a new 6 bay, truck storage building at the ODOT Clark County Full Service Facility.~|~~|~32E4789E33B0C93F157CB7F6D941A1F85E9CD9FC 102272~|~1~|~1~|~01/SAF~|~Federal Safety eligible work items with a 90% federal and 10% local participation rate.~|~~|~98CB284C634B6BA53EADBFE5411FDB224B073F36 96234~|~1~|~1~|~01/STR~|~Place 3" of asphalt on SR 196 in Waynesfield. SR 196 4.150-4.410.~|~05 - 4R Maintenance - Resurfacing~|~153FE1130E9AECAF4F319ECBCE4AE762CD80B0A0 94785~|~1~|~1~|~01/TRN~|~Rehabilitate slow ordered rail, replacing 1,450 cross ties and furnish the needed ballast and rail anchors to complete the project.~|~22 - Rail/Highway crossing~|~1EF585DE37EE27C23E5E45425A0018B3E4922E03 94785~|~1~|~2~|~02/NFP~|~Funding event is for locally funded work.~|~44 - Other~|~D372AEAEE3F650694851BC0640512424AA34AF85 114344~|~1~|~1~|~01/NFP~|~Scioto Trails State Forest maintenance project.~|~05 - 4R Maintenance - Resurfacing~|~BE4EC33E7BEC2657250A0D1C8F348E8E0C194654 104985~|~1~|~1~|~01/NFP~|~Sign replacement along MAH IR-76 from SR 534 to I-80 and MAH IR-80 from IR-76 to Lipkey Rd.~|~21 - Safety~|~85407B8910907F4C22B3776891FE599E5CBAEC65 109009~|~1~|~1~|~01/ENH~|~All work in this project. Funding is 95% federal funds through the use of Toll Revenue Credit (TRC). The match and any funds over the cap to be provided by the City of Findlay.~|~28 - Facilities for Pedestrians & Bicycles~|~100545EB2D167EEE05356FD1BAD622ACFB50FF95 108696~|~1~|~1~|~01/BRF~|~Bridge replacement 95% Municipal Bridge (4R87)/5% City of Dover (LNTP).~|~10 - Bridge Replacement~|~A5C4908045010586764BB370388ECD128CA3D57C 117622~|~1~|~1~|~01/STR~|~Purchase Order to Repair the worst areas of the embankment slippage on the NW corner of the NS Railyard due to NS Railroad cutting out the toe of the embankment.~|~~|~E7DE2DC406085EB40142FFDC88D3E92B2458B6C9 125969~|~1~|~1~|~01/BRO~|~Replace FRA-665-0326 with a new structure~|~10 - Bridge Replacement~|~8649FCB14EE65A97AE1B1FDF4BB601F96BAB320E 94081~|~1~|~5~|~05/S5K~|~Minor bridge work to the linked structures > 20' span.~|~47 - Bridge Preventive Maintenance~|~35899BFD6F61EA476DF9744FFCDA1963BF108F1C 94081~|~1~|~1~|~01/NHS/ASHT~|~Resurfacing, urban paving in the City of Ashtabula.~|~05 - 4R Maintenance - Resurfacing~|~1B7A456457852034A0AE9EBFFF9433128F31FB13 94081~|~1~|~3~|~03/S5K/ASHT~|~Resurfacing, urban paving in the City of Ashtabula.~|~05 - 4R Maintenance - Resurfacing~|~AE3910975AAE5E96C1C5C08EBA8CE28791D131B3 94081~|~1~|~4~|~04/S5K/ASHT~|~100% city items including full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~79CE87D2C51D93EAE5627345B0D5110797FA778A 94081~|~1~|~2~|~02/NHS/ASHT~|~100% city items including full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~B16F15798035E701A73E7338E57FFD5ADCCEE789 80126~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~10 - Bridge Replacement~|~6263B35D2CD9322643EEB229CDF83D082CEB9A51 100764~|~1~|~1~|~01/S>2~|~To plug existing drainage pipes and catch basins at SLM 3.65, SR4 in Hamilton County, at Ridgeway and Vine Street and install new pipe and catch basin above the old pipe that leads into the manhole at the center of the Vine Street and Ridgeway intersection~|~~|~EA0904AA146B490AA121D6F6BBE74B48DA8F1847 102760~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~5D7D25780ED6A54FF3906A8817193FF3845638F4 115484~|~1~|~1~|~01/S<2~|~All items associated with the removal and replacement of UNI-347-11.86 Culvert~|~04 - Reconstruction - No Added Capacity~|~A72AFBC835A0F2600E8F1D799167CED7F6243EF2 119162~|~1~|~1~|~01/STR~|~Chip seal project.~|~05 - 4R Maintenance - Resurfacing~|~06815074856E7FD087E118B656C05B76958C81B4 113075~|~1~|~1~|~01/NHS~|~Crack seal on: LOG-33 SLM 1.97 to 15.50LOG-235 SLM 18.07 to 24.48LOG-708 SLM 0.00 to 1.00LOG-708 SLM 2.09 to 2.32LOG-706 SLM 0.00 to 2.29~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9DB0960C6EB3B00E4F00738F655347511A54B437 100102~|~1~|~1~|~01/SAF~|~SRTS funded project~|~21 - Safety~|~26004A099364A944A6BDC08BC2546067112832B4 101397~|~1~|~1~|~01/BRO~|~Bridge~|~13 - Bridge Rehabilitation~|~D7341F62D0703C3C24238962C5483BBA73527F44 94545~|~2~|~2~|~02/ENH~|~Plan Split 2 is for CE at 100% Local (over fed max)~|~17 - Construction Engineering~|~1372E658FB6BDB96E6840FD40D4E68DA4FBCBE83 94545~|~1~|~1~|~01/ENH~|~Pedestrian Bridge~|~10 - Bridge Replacement~|~3185303ABD33788F177B082A0C2E4A3F9B9DA8B3 120434~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State~|~21 - Safety~|~09FA5BB2D5FEE5548EFA0D05C69EEACF9B2C4F1A 118189~|~1~|~1~|~01/SAF~|~Plan split for roundabout construction~|~21 - Safety~|~C2A9F5246B7A5928E778BD779C50250BFDD82FCE 103475~|~1~|~1~|~01/STR~|~D03 PR FY2020 2 year Contract~|~44 - Other~|~AEC2FDA8E3105AF8EF13A1DC7AE93C716C4F9EC5 103475~|~1~|~2~|~02/NFP~|~D03 PRUNING 2 YR CONTRACT~|~~|~B088221A74875BC0D51CF10E14186E3BE161E04E 123430~|~1~|~1~|~01/SAE~|~100% Safety-funded up to $2.5M in all phases~|~21 - Safety~|~8909A97C4284A829960050FF22DA0D32D1F3467C 126158~|~1~|~1~|~01/STR~|~Plan split for FUL-64 culvert~|~04 - Reconstruction - No Added Capacity~|~29F227722F62B74216231E5625A9C0DCF75FAD51 75946~|~1~|~1~|~01/NHS~|~Joint repair and diamond grinding on LOG US 33 from SLM 21.50 to 25.50 from the junction of SR 292 to the junction of SR 347.~|~~|~365B14D330526A8F89A05741E280D6F1E87F7AD2 89346~|~1~|~1~|~01/S<2~|~01/S<2/PV This Plan Split is for road reconstruction work eligible for federal funds from the small cities program.~|~04 - Reconstruction - No Added Capacity~|~5D669B77D356BFB5814E17F84FDE4922D05EC976 89346~|~1~|~2~|~02/S<2~|~02/S<2/OT This Plan Split is for the 100% locally funded storm sewer work that is not eligible for federal funds.~|~43 - Utilities~|~CEBAD8E0D0DA29085E4EECD8A18086430E0820B8 122366~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction costs~|~21 - Safety~|~B243C234EB34448C8EC0FBA34649AACCEE5D05D4 104945~|~1~|~1~|~01/NHS~|~Bridge deck replacement project. WAS 7 52.80 (SFN 8400660). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~219778AB38FF49DFE46C2B5B64F1FE2F878A99FE 119201~|~1~|~2~|~02/S>2~|~Urbanized area plan split for resurfacing of PIC-762-11.166-11.18.~|~05 - 4R Maintenance - Resurfacing~|~B4504BC164D5209A5C49499D2AF08AF4EFBF8828 119201~|~1~|~1~|~01/STR~|~Rural Plan split for resurfacing of PIC-762-8.85-11.166.~|~05 - 4R Maintenance - Resurfacing~|~C40502C9D5C9BE233D69E7F5AAAD180188E3C944 110455~|~1~|~1~|~01/NHS~|~Resurfacing US 22~|~05 - 4R Maintenance - Resurfacing~|~2AEFCC54ADCF3F656C3BC4E2CA2B04B22933A7D3 99594~|~1~|~1~|~01/NFA~|~Resurfacing and improvements to Commonwealth Ave NE in Howland Township.~|~05 - 4R Maintenance - Resurfacing~|~5D1125E01B1989A09147EF7757A209094C056681 100012~|~1~|~1~|~01/MPO~|~Resurfacing Campbell from Marshall to Perkins Ave.~|~05 - 4R Maintenance - Resurfacing~|~E4224C2F93695E6EC92C99714FB379F29AB81F89 103068~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 160 14.53. DSR GAL-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8CDE3B97E5CAF8A8B2EB6013B036F219AE2A2E5A 107377~|~1~|~1~|~01/SAF~|~Guardrail repair/replacement on multiple County Roads with 100% CEAO Safety (4HB7).~|~21 - Safety~|~1729E7B2CE1C4EA9805A757AC89810761DC4385B 84437~|~1~|~1~|~01/SAF~|~Extend southbound right turn lane to westbound IR275 on ramp. Begin at westbound IR275 ramps and end at Dry Ridge Connector, 0.24 miles. ~|~~|~88945B9832A6C1E24AFC65AA3569D1BCED48D525 95916~|~1~|~1~|~01/STR~|~Improve vertical alignment of SR 9 & SR 171.~|~21 - Safety~|~1E9BA106A97E9CABD89FCCBB04E6BAE9748024E9 101920~|~1~|~1~|~01/MPO~|~Resurfacing a county route.~|~05 - 4R Maintenance - Resurfacing~|~399DB96545023A7BAC7D267296D430823C0DB6A9 102830~|~1~|~1~|~01/S>2~|~Plan Split 01 created for STP > 200000 routes within Columbus urban area~|~05 - 4R Maintenance - Resurfacing~|~F5EC890E90FD6D7602DDDFC07BD6D3F01101A085 102830~|~1~|~3~|~03/STR~|~Plan Split 03 created for STP rural routes.~|~05 - 4R Maintenance - Resurfacing~|~20D702E05F0E71E0A4155741D7B33B62742EEA18 102830~|~1~|~2~|~02/NHS~|~Plan Split 02 created for NHS routes~|~05 - 4R Maintenance - Resurfacing~|~8D5E50E9708A35CA3E8DB01033DF2277FB85B8CA 99984~|~1~|~1~|~01/NFP~|~All cost are included in this plan split.~|~44 - Other~|~CDBF2000C9BBBF09D1DAB32502A5A2438EF898AC 114679~|~1~|~1~|~01/STR~|~All costs associated with the Repair of CLE-133-1324 and replacement of the CLE-133-3479 structure. ~|~04 - Reconstruction - No Added Capacity~|~5D0A7B4889EEF8089B8AC9513FF31DF7F60FE553 115671~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~E2EF32C9570C435A5E1E183C176A89300E91A3C9 112495~|~1~|~1~|~01/MPO~|~Split for MPO-funded work.~|~05 - 4R Maintenance - Resurfacing~|~530ABBD6DAB5FFEFC0FCE9799975AE8C0C203039 110993~|~1~|~1~|~01/SAF~|~Install a traffic signal with left turn lanes at the Hamilton Mason Rd and Mauds Hughes Rd intersection~|~21 - Safety~|~F1D0774EC8205E55752611251ECED0D511F36975 81391~|~1~|~1~|~01/NHS~|~Bridge Repairs - NHS structures~|~13 - Bridge Rehabilitation~|~4589F8258456D1CA9B5ACE1FB9928D9E37026A4C 81391~|~1~|~2~|~02/STR~|~Bridge Repairs~|~44 - Other~|~BE6117679431B38E04929EF364C1B98E77127322 88455~|~1~|~1~|~01/SAE~|~Signal at Riverview and Scott intersection in Napoleon.~|~21 - Safety~|~59D9436704146709D6ECF475A98D38D5B1BB96A8 105238~|~1~|~1~|~01/STR~|~Resurfacing HAS-800 from Freeport to the Tuscarawas County Line and TUS-800 from the Harrison County Line to SLM 7.49.~|~05 - 4R Maintenance - Resurfacing~|~377324836F47635F92CAD8ABBA6467457622D894 105238~|~1~|~2~|~02/S<2~|~Resurfacing TUS-800 from SLM 7.49 to Dennison.~|~05 - 4R Maintenance - Resurfacing~|~DC5772979E22BEB8103E843E001600BFC950F146 120115~|~1~|~1~|~01/MPO~|~Portion of work for MPO Funding~|~21 - Safety~|~848B07D8552C2A749B94AAE7C6238E34A701F4EE 81147~|~1~|~2~|~02/IMS~|~LUC-475 from 0.21 to 4.71.~|~05 - 4R Maintenance - Resurfacing~|~2782641BDDE77458E918CA819598A51BFF5585E4 81147~|~1~|~1~|~01/IMS~|~for LUC-75 from SLM 1.99 to SLM 4.88 in Toledo.~|~05 - 4R Maintenance - Resurfacing~|~C8B385F0B22C9A3A0E4FCAE1AB6A028ACFF92F3A 100338~|~1~|~1~|~01/STR~|~This is a place holder Plan Splt created so funding can be entered. The project will been another Plan Split. Actual splits will be determined later.~|~05 - 4R Maintenance - Resurfacing~|~B8A72B328E213913D219B580042EFE222D81CDEA 116949~|~1~|~1~|~01/IMS~|~Items associated with roadway work and miscellaneous items~|~04 - Reconstruction - No Added Capacity~|~FD8B1D5D669C33A8E9A707857AD7FEA38B0531E8 116949~|~1~|~2~|~02/IMS~|~All items associated with Bridge work~|~13 - Bridge Rehabilitation~|~1BE7F359EFCD9F1516F98A2DDFDB098EEEA4B70C 90437~|~1~|~1~|~01/S>2~|~Resurfacing of the existing roadway along with other roadway related items under the urban paving program on MOT SR 48 from 10.88 to 11.24.~|~05 - 4R Maintenance - Resurfacing~|~BE0F33D66AEC3F9E282DE0C96D8828555C4D0DE0 90437~|~1~|~2~|~02/S>2~|~Resurfacing of the existing roadway along with other roadway related items under the urban paving program on MOT SR 835 from 0.610 to 1.27.~|~05 - 4R Maintenance - Resurfacing~|~D1EA1DBBB9B85185EC1D3E1CED000E3F4E5A3077 99586~|~1~|~1~|~01/SAF~|~Intersection improvement at North Road and North River Road, install northbound and southbound left turn lanes (North Road), adjust existing lane widths to meet current standards, add back plates to signals and adjust phases and timing, resurface intersection and update pavement markings.~|~21 - Safety~|~A60A454E67ED1E81F513744EDDFBA01192C7FA81 106258~|~1~|~2~|~02/ENH~|~90% 4HJ7 and 10% Local~|~21 - Safety~|~D250217BD90B63F66691B6DEF0EDE0F387F50B00 106258~|~1~|~1~|~01/SAF~|~Signal work. 100% 4HJ7~|~21 - Safety~|~7A68EBEB00FD9B0F06C925EE808B8125B64FC345 121042~|~1~|~1~|~01/NHS~|~Type 2 Emergency ~|~13 - Bridge Rehabilitation~|~0FCD1E7AD7E9D7922B6A25D975243FDB12DAB9AC 109717~|~1~|~1~|~01/S>2~|~Microsurface~|~05 - 4R Maintenance - Resurfacing~|~9ADD770C20EB72EA981ED0C31BEF1DDCE2AC1D56 109717~|~1~|~2~|~02/STR~|~Microsurface~|~05 - 4R Maintenance - Resurfacing~|~6C7958C12526105133C9308373C1B90477425E6D 123191~|~1~|~1~|~01/STR~|~geotech plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~87A600EFA0C18B00CB1AEEF29E0B02858BBCC954 92118~|~1~|~1~|~01/IMS~|~resurface WOO IR75 19.91-26.06~|~05 - 4R Maintenance - Resurfacing~|~278C7D59853F4340259130640E2A279DE8B56BB1 109515~|~1~|~1~|~01/NFP~|~Plan split for salt storage~|~44 - Other~|~3F350B9AEE6EE960705B80EEA121B4A50BEF5F78 127140~|~1~|~1~|~01/SAF~|~installation of guardrail on county roads in Butler County~|~21 - Safety~|~4F3F3BFBC440ECC397BD39D89449BE6D43D5AD93 103806~|~1~|~1~|~01/NFA~|~The City will construct a 2 lane, 750 foot extension of Independence Parkway south from the current cul-de-sac.~|~01 - New Construction~|~5E4784846B0A495C1A07B5450E302D1B9B149D63 107131~|~1~|~1~|~01/SAF~|~Construct roundabout at offset intersections of Socialville-Foster Rd and West Chester Rd with Butler-Warren Rd~|~21 - Safety~|~2B2649293EDB09A82F1342A609BA47BDD80D6733 76432~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PS7 (100% State) - No CAP - Resurfacing on LIC SR79 0-1.35~|~05 - 4R Maintenance - Resurfacing~|~1D11B91E5E91EC1EB32868311C682DF4400AC1D1 76432~|~1~|~4~|~04/S<2~|~"04/S<2/BR/ " - District Preservation 4PS7 (100% State) - No CAP - Water proofing and overlay maintenance work on SFN 2303469 FAI SR360 0.07 Intersect: South Fork Licking River - Not BR Eligible Length=97 - SD/FO(0) SR=100 DSR=6~|~13 - Bridge Rehabilitation~|~718655CFE57C16A59E99F4D4335C6504F36D4309 76432~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PS7 (100% State) - No CAP - Resurfacing on LIC SR79 4.36-6.56~|~05 - 4R Maintenance - Resurfacing~|~8BBF4BE1D1CA1423C2659803B6BE3445EA36BECF 76432~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) LIC SR79 1.35-4.36; 2) FAI SR360 0-1.72; 3) LIC SR360 0-0.22; 4) SFN 4504666 LIC SR79 2.6 Intersect: SR 79 Over Ditch #~|~05 - 4R Maintenance - Resurfacing~|~E9FBDE50A35AAC9A0406A1AD836675492F9C6321 123475~|~1~|~1~|~01/MPO~|~Roadway reconstruction and pedestrian/bike facilities along E Cooke Rd from Glenmawr Ave to Karl Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~BD752A9F8D85EDE86FEB487E595692295433B3CC 100913~|~1~|~1~|~01/STR~|~Overlay SR 501 in Auglaize County with asphalt concrete. AUG SR 501 SLM 3.54 to 7.59~|~05 - 4R Maintenance - Resurfacing~|~BC6912176A677CC46703F4A9A6E9997A2CF60459 100913~|~1~|~2~|~02/S<2~|~Overlay SR 501 in Auglaize County with asphalt concrete. AUG SR 501 SLM 3.04 to 3.54~|~05 - 4R Maintenance - Resurfacing~|~E538CE4B68DFA0BB5BBFAC6CD5CDFD9054D489F7 116529~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FEC0E68B7BA2655DE4A72E09D2AB9062819DB9AE 96365~|~1~|~1~|~01/STR~|~SFN 4603826 LOG-540-0508 - Replace with 8' x 4' RCBCSFN 1103385 CHP-814-0025 - Replace with 2 - 48" RCP~|~13 - Bridge Rehabilitation~|~9EB5384FED4EF0BB71E1CD21DF9A129E953E5068 13190~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all projects using federal NH funds. 4300424~|~~|~B65F647B2BCC524D44207130FB070B30C3984035 109715~|~1~|~2~|~02/STR~|~AC Overlay without repairs on:AUG-65 SLM 7.32 to 10.60~|~05 - 4R Maintenance - Resurfacing~|~DD10942EFA1DCD8B69C18A1C8EA186DA472E5AFB 109715~|~1~|~1~|~01/NHS~|~AC Overlay without repairs on:AUG-33 SLM 16.47 to 23.070~|~05 - 4R Maintenance - Resurfacing~|~8ADF0AF54EF910178588FFB09E2451C4BC4BF2A3 109715~|~3~|~3~|~03/NHS~|~Participation code added to project in the amount of $13,000 50% = State 50% = SAC 6FC7 4N40 ~|~05 - 4R Maintenance - Resurfacing~|~6DE1EE1AEA86EE8B5FE1F3DAB3AF9E74DA9FE418 106079~|~1~|~1~|~01/NHS~|~Resurfacing of SR 81 in the City of Lima from Jackson Street at 17.01 to the east corporation limits of the City of Lima at 18.17. The 80% federal funds will be from the District Preservation Program budget. The 20% non-federal match will be provided by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~6E8D71E61457A6CF4C72331587F09F027A7B1A96 106079~|~1~|~2~|~02/NFP/LIMA~|~Items paid 100% by the City of Lima such as curb ramps and aux. pavement parkings.~|~05 - 4R Maintenance - Resurfacing~|~8D66113086E4F67BAA414A04AF2E3D8233791A64 102892~|~1~|~1~|~01/SAE~|~Pavement markings on Ashland County roads within the Ashland Area~|~21 - Safety~|~2B13CE211458A4BF796F2F0ED223B23D820AB56E 102892~|~1~|~2~|~02/SAE/ASD~|~Pavement marking on Rural Ashland County Roads~|~21 - Safety~|~7BA1FD96654FA551B57C7FA27DCCC9AC4C401282 127209~|~1~|~1~|~01/SAF/RAVE~|~Intersection improvement.~|~21 - Safety~|~7984EBA8C15A6981B24997E0A36ADBCB0532FA57 110174~|~1~|~1~|~01/IMS~|~This slide is located along the south side of IR 74 within a fill section just prior to the EB I-74 North Bend Rd exit ramp. Over saturated fill, in combination with a stream at the toe of the slope, resulted in failure to the embankment.~|~04 - Reconstruction - No Added Capacity~|~ACCE49AFDC31A629B9638196724F832FAFD383C7 103454~|~1~|~1~|~01/MPO~|~Drainage system on CR 18.~|~44 - Other~|~17BC18C630480A8D5E732E6B385A89CFAF952646 107728~|~1~|~1~|~01/STR~|~All work in this project is in this plan split. Federal and state funds from the District Preservation Program budget.~|~~|~A088D96E60E77336643B9645147DF087B43DB600 84238~|~1~|~1~|~01/MPO~|~North Fairfield Road from NB IR 675 to on ramp from SB North Fairfield to IR 675. Construct a pedestran/cyclist bridge over IR 675 , located just west of North Fairfield Road to provide safe and convenient pedestrian access across IT 675 to Wright State University, nutter Center, shopping and offices.~|~28 - Facilities for Pedestrians & Bicycles~|~245A1E25B644448B21B98A192E933B0E122E58B7 113603~|~1~|~1~|~01/S>2~|~Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7)~|~28 - Facilities for Pedestrians & Bicycles~|~F0A7D6B992B5A0CF651488A610CA6E24E1E6DFFB 125023~|~1~|~1~|~01/IMS~|~Bridge parapet repairs~|~13 - Bridge Rehabilitation~|~F7E091579DA2F20754404F77D5388BEF97C932BA 125023~|~1~|~2~|~02/NHS~|~Bridge parapet repairs on structures FRA-315R-15.16 and FRA-315R-13.02~|~13 - Bridge Rehabilitation~|~E67A06D1798A362CAD2D2F62FF517B910A57FDE0 124221~|~1~|~1~|~01/NFP~|~Tree clearing~|~44 - Other~|~65752919907E59848C796A36B79D84A7F0053EAD 116266~|~1~|~1~|~01/MPO~|~Sidewalk and Crossing improvement at intersection of SR61 and Mary Fate Park Dr~|~28 - Facilities for Pedestrians & Bicycles~|~BCB91280A33E0CEEDC4EFB8B4E2F47C9E944587A 116266~|~1~|~2~|~02/MPO~|~RCRPC funding (C227/RI03) for design consultant On-Going Services~|~17 - Construction Engineering~|~4AE6DA9CF771C399C058942607193D5E292C52DB 100791~|~1~|~1~|~01/NFP~|~Construction of noise barrier.~|~44 - Other~|~CEFACC1B13435E05EDE70067DBAD2FF2498B5AFF 113319~|~1~|~1~|~01/IMS~|~Split for noise barrier repair~|~99 - State Preventative Maintenance~|~468DE019897DAA2F975D390F022DAAD5FD30427F 101122~|~1~|~1~|~01/NHS~|~Signage replacement at various locations within Ottawa, Sandusky, and Seneca Counties.~|~44 - Other~|~F3F2EB5355841D088F202DAE45756A32BEA65D26 92370~|~1~|~1~|~01/STR~|~Plan split for resurfacing of SAN-412 and SAN-590~|~05 - 4R Maintenance - Resurfacing~|~8AFA37C1C8D7140B6BAC0E81CE5224FFB2FA729F 98039~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-USR 62 and Kno-USR 62.~|~05 - 4R Maintenance - Resurfacing~|~FADA245C9F7D57C35840EDB89BD8059C36E9680A 100997~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation Pavement Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Microsurfacing with related work on: 1) Lic-SR 13-13.97 to 22.52;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ECC23A6417AE52AE5676A827EEF329608F6E7D6F 100997~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation Pavement Funding 4PF7 (Federal 80%) / 4PF7 (State 20%) - No CAP - Micro Surfacing on Gue-US 40-9.75 to 11.99.~|~05 - 4R Maintenance - Resurfacing~|~7A0F633B031984BF19353C085CBA54163919A09E 100997~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation Paving - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Microsurfacing with related work on: 1)Gue-US 40-11.99 to 16.21, 2) Per-SR 13-19.88 to 26.88, 3) Per-SR 93-00.00 to 1.07, 4) Per-SR 93-03.90 to 11.58~|~05 - 4R Maintenance - Resurfacing~|~FF7D6AE4FAE06D90F81DB00CF676BF3DA7B704C2 109880~|~1~|~1~|~01/STR~|~2023 Operations Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~58F0E08B24A7B2C889D7BDBB6286182D5D666CE8 107239~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 669 11.25. Not on any federal aid system. GSM funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6725B18B9BBAC6A4978FAB26999814D7378FB2B4 89260~|~1~|~1~|~01/NHS~|~80/20 funding split for work in the NHS section that is eligible for State STP funds: SLM 2.56 to SLM 3.07.~|~05 - 4R Maintenance - Resurfacing~|~580BC1C595BE79F8A74E8C4F53F90C6830B6CECE 89260~|~1~|~2~|~02/NFP~|~Work not eligible for federal/state aid.~|~05 - 4R Maintenance - Resurfacing~|~AFD06CB18325273FD35C9CB775E14126A72C3F13 122853~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~071C89A9FB03308DC3CE482F82B1B51FE4E693DF 112798~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-270-43.18-48.47~|~05 - 4R Maintenance - Resurfacing~|~FBB2323D610FD7851CE785DC7F1E45F48AD11E53 112798~|~2~|~2~|~02/IMS~|~Bridge Rehabilitation Work~|~13 - Bridge Rehabilitation~|~F52BADA5E03FF338FAF17C7CDDE939F7709C768A 112798~|~1~|~3~|~03/IMS~|~Costs to due to vehicle damage repairs~|~05 - 4R Maintenance - Resurfacing~|~9D81E0CCC7B2ECE6D08AE739ED2F5F16F4B129D1 118192~|~1~|~1~|~01/SAF~|~Intersection and drive improvements at Busch Boulevard in Columbus~|~~|~778C37CCC6BB6C69B0ADB4B9B443C2D8C54F1B7C 127145~|~1~|~1~|~01/BRF~|~replacement of existing bridge SFN 2432684~|~10 - Bridge Replacement~|~3E12410092F5AA8AFAF45371E77A66DA6B14B2B7 126213~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~06714CDACEFF18A31DFE873358547B9FD3528BB9 98394~|~1~|~1~|~01/NHS~|~LOR-18-0.00-13.96 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FDB74CF9FE71D6CCAF57715A690EFF0ADCEC4343 98394~|~1~|~2~|~02/NHS~|~bridge work to be determined later.~|~13 - Bridge Rehabilitation~|~413A7728C4CC8FB97E2A7EB99AA3D98E53F95C7A 120549~|~1~|~1~|~01/BRO~|~Plan Split for Municipal Bridge Funding ~|~40 - Special Bridge~|~6F7F382BEAD9FF39ABCDFA93C61D05DB70D4FC63 96238~|~1~|~1~|~01/STR~|~Ros 772 11.85 Ros 772 13.23~|~99 - State Preventative Maintenance~|~CD889755A36AF230A40C5DA1271E5FE2939837F5 97211~|~1~|~1~|~01/STR~|~Project cost for roadway, guardrail and drilled pier wall at this location.~|~44 - Other~|~1FCE075589B38B6F99C135EFBCEBF3B92C38BA9D 88392~|~1~|~1~|~01/BRO~|~Replace existing structure carrying Mud Run (Length 88 ft) on SFN 1205730 CLA-SR-235 2.370~|~10 - Bridge Replacement~|~65111EADC7A8FEEB78DC10B8F3723FE071483C3F 115280~|~1~|~1~|~01/S<2/MTVE~|~"01/S<2/OT/MTVE" - 95% Federal (4B37) and 5% Local (4BG7) - construction of share used path.~|~01 - New Construction~|~E171758916B8B21E7234060CEC2DC4F64E8C443E 117943~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4.~|~~|~AB7AD50766B43ED2B6F4E96607EA1321A7209B12 121492~|~1~|~1~|~01/STR~|~Bridge replacement.~|~10 - Bridge Replacement~|~51C3586A8866D32A404580267B27B3FA10E3BB88 105088~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code.~|~21 - Safety~|~6ABBEDBB9F14309C5512939C261F1D47FFCBA365 94403~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FEDE975FB943DAC1BAA4A356ABF75BF0E35ACCD5 94403~|~1~|~3~|~03/STR~|~Bridge Work on Structures less than 20'~|~04 - Reconstruction - No Added Capacity~|~0629C90E5E0C7B887118D7FFF43D78EBB2515228 94403~|~1~|~2~|~02/STR~|~Bridge work for structures over 20'~|~13 - Bridge Rehabilitation~|~C3224A34398AE702080AAACC37E0B5998E41D582 87407~|~1~|~1~|~01/S>2~|~Widen SR-750 to five lanes from Wellington Blvd to Sawmill Parkway~|~03 - Reconstruction - Added Capacity~|~E67C0E23FEAAF0AF833D891EF79611EE095BE776 122485~|~1~|~1~|~01/BRO~|~Bridge rehabilitation. ~|~~|~3E8F41DD6176844DA09C959961666F28180FBFEB 92871~|~1~|~1~|~01/BRF/PCEO~|~"01/BRF/BR/PCEO" ? County Engineer?s Association Organization (CEAO) Bridge Program 4B87 (Federal 80%) / 4BG7(State 20%) ? CEAO CAP of $422,180.00 for Construction Phase ? Credit Bridge CAP of $66,600.00 - Bridge replacement of SFN #6430007 PER TR79 00.02 Intersect: Thornport Canal: BR Eligible for Replacement Length=34' SD/FO(1) SR=41.0 DSR=7~|~10 - Bridge Replacement~|~5D1F9402EDFC00CC090CABB902ED32D4A595BC0D 90387~|~1~|~1~|~01/CMQ~|~MORPC CMAQ for signalization at 12 intersections on Broad St and Main St.Local Sponsor - City of Bexley~|~21 - Safety~|~49F1711B0EADDBD43AD910FF2EF7992CF01392A7 125004~|~1~|~1~|~01/ENH~|~MPO TAP funds~|~28 - Facilities for Pedestrians & Bicycles~|~29AAF994F404F5E89927449951D0CB9905E8A813 87193~|~1~|~1~|~01/NHS~|~Priority System - Minor Rehab on BEL-7-14.08 to 17.74; includes asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~70DDB56DEBB1A2EDD16EC7CFCA061E0510BB275F 118705~|~1~|~1~|~01/STR~|~Superstructure replacement.~|~~|~F126821CA58526D29CA3841FE3CF274395464D8B 105790~|~1~|~1~|~01/BRO~|~Split for bridge rehab work~|~13 - Bridge Rehabilitation~|~10D6ACAD550A37BF0F0C3F2C7FE80BCF288C6F36 88982~|~1~|~2~|~02/STR~|~BRO US68, 31.28 - 41.08 Resurfacing ProjectBrdgs F/Rehab:0801836 BRO US68 35.54 Intersect: Fivemile Creek0801887 BRO US68 40.91 Intersect: Trib E.Fork Little Miami0801984 BRO US68 40.16 Intersect: Little Indian Creek80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~AB854D13C1F1AB78E8E3EFD8C26586E6B9E1F0C4 88982~|~1~|~1~|~01/STR~|~BRO US68 31.28 - 41.08 Resurfacing ProjectOn US68, within the Mt. Orab corp at the joint (SLM 31.28) head north for 9.8 miles and terminate within the Fayetteville corp at US50 (SLM 41.08), it is proposed to resurface the asphalt roadway.Pave Thru Brdgs:0801801 BRO US68 32.390801860 BRO US68 36.6 Intersect: East Fork Five Mile Creek0801925 BRO US68 39.89 Intersect: Indian Creek80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~CCA8A7C563E1BCC6FB132FAEE3CF90790D1C1D4A 83456~|~1~|~1~|~01/MPO~|~Pavement widening~|~03 - Reconstruction - Added Capacity~|~8046417B48565D4ECDE12EA19D7791FA9EA3CF1E 83456~|~1~|~2~|~02/MPO~|~100% local items.~|~03 - Reconstruction - Added Capacity~|~B11D6732A21BE7EFB8CE0FDA548C91AA14DCB2C3 22655~|~1~|~1~|~01/NHS~|~Resurfacing COS 36~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E8B348BF26D2D8926856550D9B573D64492B2635 103879~|~1~|~1~|~01/IMS~|~Plan split~|~03 - Reconstruction - Added Capacity~|~A35CD61C709CE1B64AB49315367467F58715B80D 101256~|~1~|~1~|~01/IMS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~51AEF09D62CAA469CE7A43D9C1A6B3B716A49730 121005~|~1~|~1~|~01/S>2~|~Plan Split for the 80/20 - ODOT/City items~|~05 - 4R Maintenance - Resurfacing~|~FDD41D693B9F38C8AD80D1B0872E3692520C5010 121005~|~1~|~2~|~02/S>2/CINC~|~Plan split for the 100% City items~|~05 - 4R Maintenance - Resurfacing~|~F094A4BCE8FFD8AA01F5D982A4F2D9DECFED4497 82033~|~1~|~2~|~02/S<2~|~01/S<2/PV/ Work outside the City of Upper Sandusky but inside the Upper Sandusky Urban Area. All funds are from the District Presevation Program budget. No local funds. SR 53 from 11.63 to 11.65 on the right side. SR 53 from 13.97 to 14.44 on the right side and starting at 13.99 on the left side.~|~05 - 4R Maintenance - Resurfacing~|~600E4882BAF293D9E396EB83EDCF479235FD9CD3 82033~|~1~|~1~|~01/S<2/USAN~|~01/S<2/PV/USAN Resurfacing work inside the City of Upper Sandusky. Funding is 80% federal STP funds provided by the District and a 20% match provided by the City of Upper Sandusky. SR 53 entered the City of Upper Sandusky at 11.63 on the left side and 11.65 on the right side. SR 53 leaves the City of Upper Sandusky at 13.97 on the right side and 13.99 on the left side then re-enters the City at 14.44 on the right side and remains in the City on the right side until 15.32.~|~05 - 4R Maintenance - Resurfacing~|~7C8FCD318C3A739ACF21D22271B8CCD465F3546C 82033~|~1~|~3~|~03/NFP/USAN~|~Curb ramps and auxilary pavement markings that will be paid 100% by the City of Upper Sandusky.~|~44 - Other~|~99DD71FBE569A03CD0D0A3B2243D3ED4760EC298 126186~|~1~|~1~|~01/S>2~|~Construct shared use path~|~28 - Facilities for Pedestrians & Bicycles~|~F2276AD77C6B9967BD73A42DF5D1C2F6C8266A40 104186~|~1~|~1~|~01/NHS~|~Slide Repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~83EC10F9AF81FA061D510A2DB965B0A84C00FA90 100471~|~1~|~2~|~02/NHS/AQUA~|~Replacement of Aqua Ohio waterline through project limits.~|~04 - Reconstruction - No Added Capacity~|~CE18E4EF776E05FAA9823633C895DF06BD8E0471 100471~|~1~|~1~|~01/NHS~|~Widen (for Two Way Left Turn Lane) and resurface SR 241 from Lincoln Way to Taggart Street includes full and partial depth repairs and pavement planning. Upgrade signals with fiber interconnect at 4 intersections. Includes replacing sidewalk, concrete and asphalt drives, catch basins, sanitary sewer, and replacing curbs with curb and gutter. In the City of Massillon.~|~04 - Reconstruction - No Added Capacity~|~24098FD2F3D14F6824E57F4A00A6294E43F0B2A8 100471~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~237BC3926A1A2BA2E1BB596D1C9ED346A0DBCDFF 116964~|~1~|~1~|~01/S>2~|~Resurfacing~|~04 - Reconstruction - No Added Capacity~|~2F2F25696E38FEDCBE44A5625FEBA7004114B3A4 98215~|~1~|~1~|~01/NFP~|~Electrical maintenance throughout the District~|~44 - Other~|~B38E675856561501299F804F60D86FC85A7C0803 117938~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~18A1EC19A5098DF63C4B5D324A1ACD09D2F56848 110499~|~1~|~1~|~01/STR~|~Resurfacing HAS-9, JEF-43, JEF-150 and JEF-152~|~05 - 4R Maintenance - Resurfacing~|~7EF00B82E5C0AA77CEA7C24075554DD472B78D85 108613~|~1~|~1~|~01/BRO~|~Bridge replacement project. HOC 180 5.37, SFN 3702944. Bridge on system eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~0A86DF7C2AE91959A2E59B1F2C9678F624859F2D 88844~|~1~|~2~|~02/STR~|~Culvert Replacement: ASD-96-2.35~|~04 - Reconstruction - No Added Capacity~|~BBA4FF5602082E80D55474B6B7878DBF635537D0 88844~|~1~|~1~|~01/STR~|~Bridge Replacement: ASD-96-2.56~|~10 - Bridge Replacement~|~EA7B0A3B7872688E47343236244133E8A61EBC02 103788~|~1~|~1~|~01/STR~|~Landslide repair. MRG 792 5.11. DSR MRG-003.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9DC7A488452181F6562388A3BECF91223F2B7C3F 115471~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ - 100% state funded (4BF7) by ODNR~|~05 - 4R Maintenance - Resurfacing~|~423E88725A81EE238BEE16ABED586B7E13D2AFAF 123692~|~1~|~1~|~01/MPO/STCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~CA43A1BC6BA5F9C1B4870CF266E9C6AC7AA0AB75 77719~|~1~|~1~|~01/NHS~|~Preventive Maint. project using an AC inlay treatment. ATH 50 4.99-9.18 (City of Athens). NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BCFB11ACAD26C383B3C883085B62539FD90207E4 115611~|~1~|~1~|~01/ENH~|~Streetscape and sidewalk improvements in the Village of Gnadenhutten utilizing Federal Carbon Reduction and Safety funds and State SIB funds up to respective funding caps.~|~28 - Facilities for Pedestrians & Bicycles~|~35A6C5011EA2401B16C7021EDE2F01E6465CDCD3 98679~|~1~|~1~|~01/NHS~|~90% federal - 10% local participation on eligible work items for the widening of US-20 to accomodate a center 2-way left-turn lane between SR-615 and Murray Street.~|~21 - Safety~|~5E1D078DD8B9CBB35881EB81052BA3DA74D24A34 116700~|~1~|~1~|~01/STR~|~For resurfacing on SR 231 in Wyandot County from SLM 3.03 to 10.34. District Preservation Funds.~|~05 - 4R Maintenance - Resurfacing~|~4EB9724345A23646DA4EF263CFE29DB36E5DAC8F 111029~|~1~|~1~|~01/SAF~|~Repair landslide along Columbia Parkway.~|~21 - Safety~|~C89A021107496B8D3F4285BD56FD376A29BBCD1A 94042~|~1~|~1~|~01/NFP~|~Environmental remediation at Rootstown county garage site in Portage County, Ohio.~|~44 - Other~|~26A1EC5ABA442FB6CBBC1593426A65EC944F3F11 121053~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ADAD41F5388460C379376F4E26BDBEFD74E9A9B2 89001~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill~|~44 - Other~|~3E90316703245862DE9EBABFAA4ABD996CAAC511 115277~|~1~|~1~|~01/CMQ/CIN~|~Installation of fiber optic interconnect cable, upgrades to existing traffic signals with LED technology, new traffic signal controllers, video detection, and traffic cameras. In the OTR and West End neighborhoods of Cincinnati.~|~21 - Safety~|~6BB3E2B15DF5E0F9626572E5756C733B1BC9E24B 115277~|~1~|~2~|~02/CMQ~|~ Installation of new traffic signal controllers, video detection, and traffic cameras at non warranted locations.~|~21 - Safety~|~CAB35B34B0D604D57A733D37E9FE3B1AD08F4E13 125119~|~1~|~1~|~01/BRF~|~Muni Bridge plan split~|~10 - Bridge Replacement~|~20035E0C2A39AE5D514AC33B9B2EECDF863B898D 104276~|~1~|~1~|~01/MPO~|~Plan Split~|~05 - 4R Maintenance - Resurfacing~|~AFFAA74C14377E3E8954D3F0373038E121937C5C 101257~|~1~|~1~|~01/IMS~|~Microsurfacing of IR-480 between SLM 0.00 and SLM 8.67, in Summit County, Ohio.~|~~|~D2AE29008493E524C501D02957AC5ABFDF4F85A4 119173~|~1~|~1~|~01/SAF/CCEO~|~Reconstruction of Osborn Road from Dalton Road for 0.8 miles. Improvements to vertical and horizontal alignment, widening of pavement and shoulders, removal of fixed objects from the clear zone.~|~21 - Safety~|~602ECC9804ADEFBDE96339B6B639751F40CAE393 89417~|~1~|~2~|~02/NFP/PORT~|~This is for the water works.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4A201EFEF94EC76F949BA14B179299FAB4CC78AD 89417~|~1~|~1~|~01/S<2~|~A Small City funded project to reconstruct and widen OTT CR501 0.39-1.04~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D13457C3DC2B6F44BC39EE181D21E9D977D8A9B9 98475~|~1~|~5~|~05/IMS~|~Minor bridge work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~2272702A86007C45678AEF40A89E8C6D44013E4C 98475~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing SUM SR 18 from 13.41 to 14.56.~|~05 - 4R Maintenance - Resurfacing~|~EC8A5840F12A783A65F8951AF2755C9FC5D8E974 98475~|~1~|~3~|~03/S>2/AKRO~|~Resurfacing SUM SR 241 from 10.41 to 11.21Resurfacing SUM SR 261 from 5.70 to 6.05 and 8.11 to 8.91.~|~05 - 4R Maintenance - Resurfacing~|~0B821B67D9446ED8EF1803A29808C14828A8A6C5 98475~|~1~|~6~|~06/S>2~|~Minor bridge work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~17457B4B6DA50355131E6904128DF09B8AA35FEF 98475~|~1~|~2~|~02/NHS/AKRO~|~100% Akron items for partial depth repairs and curb ramps on SUM SR 18.~|~05 - 4R Maintenance - Resurfacing~|~BB15F205F0E76347350480E8DA0AA352CD805732 98475~|~1~|~4~|~04/S>2/AKRO~|~100% Akron items for partial depth repairs and curb ramps on SUM SR 241.~|~05 - 4R Maintenance - Resurfacing~|~2DD3A9FC7E436D7B602D69BCC3A6F360466484FB 108946~|~1~|~1~|~01/SAF~|~Work funded by the Safe Routes to School program. Funded needed over the cap to be provided by the Village of Payne. The Safe Routes to School funds will be used at a 100% rate with the use of Toll Revenue Credit.~|~28 - Facilities for Pedestrians & Bicycles~|~BE5B604CA5573F22BEF5379F1FC2AFE4A291D5DB 89104~|~1~|~1~|~01/BRF~|~Municipal bridge funding to replace SFN 2567652, Elm St bridge, over Mason Run~|~10 - Bridge Replacement~|~A34B577CCC5B1FBF61D3DF6E0717BDD693A9499E 107998~|~1~|~1~|~01/NFP~|~Guardrail Contract.~|~44 - Other~|~93541FCF5BB87439DC6481C65997871947337709 107998~|~1~|~2~|~02/SAF~|~Box Beam GR change order~|~21 - Safety~|~9B1045582A57AE3E23B3864EC821C7BAD9CA6857 107998~|~1~|~3~|~03/SAE~|~Truss and Sign removal.~|~21 - Safety~|~9A9232022921719BDA4B1B812737F2C28E052102 114522~|~1~|~1~|~01/BRO~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~D018584461199EF5CC3EA3B85138BE3509F759B3 109716~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~17 - Construction Engineering~|~E7DCFDCA37553D1F15316DBE651CCA1AB46DFAA9 109716~|~1~|~2~|~02/S<2~|~AC Overlay without repairs~|~17 - Construction Engineering~|~B914DE423B6F5C84E2D7227C4F8F592FBB2FA712 90765~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~10 - Bridge Replacement~|~EB2227FA4BAA80563A55A2C2A3BF9692943BACDC 102805~|~1~|~1~|~01/S<2~|~Federal and State funds from the ODOT Central Office Geologic Site Management (GSM) program. Any amount of the GSM cap will be covered fro the district preservation program budget. GSM funds are to be used first.~|~44 - Other~|~1832AF7FA9137E20D183A2CD61811D89124D273C 91401~|~1~|~2~|~02/S<2~|~PIC 22 SLM 18.95-20.65 General system paving but in the urban func class area~|~05 - 4R Maintenance - Resurfacing~|~82C0FD33F35405C846F2FC75CF777BB4403A48D9 91401~|~1~|~4~|~04/STR~|~STP Rural bridge replace Non-BR eligible 100% state PIC-22-21.99 over County Home Ditch~|~10 - Bridge Replacement~|~AB2ED7920F95A4E723C12EA0F09A065D83DFDFD2 91401~|~1~|~1~|~01/S<2~|~PIC-22 SLM 17.34-18.95, Circleville urban paving and in urban func class area~|~05 - 4R Maintenance - Resurfacing~|~B8BB9F1C51AA658262FD7F28DFEF4712715F507A 91401~|~1~|~3~|~03/STR~|~PIC-22 SLM 20.65-23.96 General system paving and in the rural func class area~|~05 - 4R Maintenance - Resurfacing~|~F4687959D0125FA30F1BC8E1D23F1A4E5C20850D 124490~|~1~|~1~|~01/IMS~|~All construction on IR 71~|~04 - Reconstruction - No Added Capacity~|~737428D8469AB96BF13996DD1DF00C6B8B284F88 76358~|~1~|~2~|~02/NHS~|~Minor bridge work on 14 structures (not BR eligible):8000670 UNI US33 0.37 Intersect: Flat Branch8000689 UNI US33 0.37 Intersect: Flat Branch8000778 UNI US33 3.4 Intersect: Buck Run8000808 UNI US33 4.12 Intersect: North Branch Buck Run8000883 UNI US33 4.28 Intersect: Over Bear Swamp Road-C1498000891 UNI US33 4.28 Intersect: Over Bear Swamp Road-C1498000921 UNI US33 4.95 Intersect: East Branch Buck Run8001006 UNI US33 5.93 Intersect: Over Paver-Barnes Rd-C1348001014 UNI US33 5.93 Intersect: Over Paver-Barnes Rd-C1348001065 UNI US33 7.85 Intersect: Over Sr2458001073 UNI US33 7.85 Intersect: Over Sr2458001219 UNI US33 8.34 Intersect: Us36 And Sr 4 Ramp8001227 UNI US33 8.35 Intersect: Us36 And Sr 4 Ramp8001243 UNI US33 8.56 Intersect: Ramp Over Sr245~|~05 - 4R Maintenance - Resurfacing~|~97E5C4FA4D3BE5B9D3C72B37F8882D425C4AF47F 76358~|~1~|~1~|~01/NHS~|~Resurfacing of UNI-33 from 0.00-8.74~|~05 - 4R Maintenance - Resurfacing~|~9B2088062BBEF2B86BF537FD2A806459744F5FEA 84403~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~C1025D940C2725CC81784E76746AE90DEE9311AA 119280~|~1~|~1~|~01/S>2~|~Replace structure over Noble Run/Store~|~04 - Reconstruction - No Added Capacity~|~396063C71518642402A75EB7826FE90622744E7C 87003~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. MEG 124 42.00-45.73 and MEG 681 5.05-9.25. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E2852B2FDA3B1367F0910B6B477ACC5142AA09D1 95432~|~1~|~1~|~01/NFA~|~Salt Shed at Jackson County Garage~|~44 - Other~|~18B11FD4BAA18BD40F6FCBD1A9A6A34FEA4CA6C2 95628~|~1~|~2~|~02/SAF/COL~|~Resurfacing of Sawmill from IR 270 bridge to Billingsley Rd, portion with 100% Columbus funding~|~05 - 4R Maintenance - Resurfacing~|~226F4797F3E117E866C59ED0A642B19DDB650723 95628~|~1~|~1~|~01/SAF~|~Safety funding to add NB outside lane from I-270 to Hard Rd~|~03 - Reconstruction - Added Capacity~|~653DFF57A5546093849D2CE4618C313A997E3D22 95628~|~1~|~3~|~03/SAF/DUB~|~Resurfacing of Sawmill from IR 270 bridge to Billingsley Rd, portion with 100% Dublin funding~|~05 - 4R Maintenance - Resurfacing~|~85A0516B793322B4334E54D801B62E10253F4995 101008~|~1~|~3~|~03/STR~|~Resurfacing and related preventative maintenance work on bridges in rural (STR) portion.~|~05 - 4R Maintenance - Resurfacing~|~AF632C09A86C52935C9BF5C63AB5E280BC5E12C4 101008~|~1~|~2~|~02/S5K~|~Resurfacing and related roadway work in Sk5 section.~|~05 - 4R Maintenance - Resurfacing~|~D5CD5AF4A61AD396189D5D719A1DD4F85DEC9B48 101008~|~1~|~1~|~01/NHS~|~Resurfacing and related roadway items on MUS/COS-16~|~05 - 4R Maintenance - Resurfacing~|~F503422514F39B8A3EDBCB3AAE941253B9BFE736 109622~|~1~|~1~|~01/BRF/YOUN~|~Demolition of structure over abandoned railroad.~|~10 - Bridge Replacement~|~30755E87CC9A8B14A5AA1FFD58ECC4D07E5097C5 109622~|~1~|~2~|~02/NFA/YOUN~|~Bridge ineligible items.~|~10 - Bridge Replacement~|~6625C3AF33C25DEB7C8DA6C375D1658F06D41280 126604~|~1~|~1~|~01/MPO/NILE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F7627183FD8C3E7D370A24D3BB48D6EF09DB8234 105194~|~1~|~1~|~01/NHS~|~plan split for roadway work on the NHS portion:WAR-122 SLM 6.20 to 7.14WAR-122 SLM 7.14 to 7.40~|~05 - 4R Maintenance - Resurfacing~|~1CD8B255746B40927C989C0F56A1EC9E4C83DEB4 105194~|~1~|~2~|~02/S>2~|~plan split for roadway work on the large urban portion:WAR-48 SLM 0.30 to 1.64WAR-48 SLM 4.64 to 4.84WAR-48 SLM 4.84 to 5.23WAR-48 SLM 16.73 to 18.30WAR-48 SLM 18.30 to 19.54WAR-48 SLM 19.54 to 23.08~|~05 - 4R Maintenance - Resurfacing~|~4DFAC06A685ADFBDFBD6F71B8D13469E10344EA2 105194~|~1~|~3~|~03/STR~|~plan split for roadway work on Rural portion:WAR-122 SLM 5.15 to 6.20WAR-48 SLM 1.64 to 4.64~|~05 - 4R Maintenance - Resurfacing~|~71B1B218275411EA9379AC431289DFBD27955D41 105194~|~1~|~4~|~04/SAF~|~Centerline rumble stripes.~|~21 - Safety~|~8DD430FE5099B766C9B37BF943A4A08910C7C18D 108697~|~1~|~1~|~01/IMS~|~Concrete pavement repair. NOB IR 0.00-11.19 and WAS IR 77 6.63-17.64. Interstate route funded 90 federal/10 state.~|~05 - 4R Maintenance - Resurfacing~|~60C32DFE8AFC75E4E011BDD1D0D43098C555089C 105283~|~1~|~1~|~01/NHS~|~Plan split for the NHS section: CLE-32~|~05 - 4R Maintenance - Resurfacing~|~E64E2DD05F476046BD2C12D7DF15010519354A09 93939~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2018. Various routes and sections in D10. Funded 100% state.~|~21 - Safety~|~FB5DBCDF8F20CD1397E4289D18D30B9F02282435 113811~|~1~|~1~|~01/BRF~|~Replacement of SFN 3934772~|~10 - Bridge Replacement~|~38ED8DD7C87F60644B3105FDDE15CDFEC85252AB 92229~|~1~|~1~|~01/IMS~|~100% state fund code for all work~|~47 - Bridge Preventive Maintenance~|~0DDBD12EE9E240E2E05E6AE80D7EC4D64ECEFBA0 106339~|~1~|~1~|~01/SAF~|~CR 10 3.15 - 3.45 realign horizontal curve on CR 10 as well as to widen the pavement and berms.~|~21 - Safety~|~07AC3CAF72B788473CD0A3507D72EB0FF16594E4 113511~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for upgrading guardrail on county roads~|~21 - Safety~|~68FB6D6B4ABABA6F38EDFF688D37C829E8A7CD73 95590~|~1~|~1~|~01/CMQ~|~Bike/Hike path. CMAQ and STP funds from the Lima-Allen County Regional Planning Commission. The CMAQ funds will be used before the STP funds. The CMAQ eligibility was approved in an April 14, 2014 letter.~|~28 - Facilities for Pedestrians & Bicycles~|~B4D5DC59B8D6824BE6B5121A4457E4973EA20626 120693~|~1~|~1~|~01/STR~|~All roundabout construction work included in this split.~|~21 - Safety~|~9E9E109889288E4A9B61228E4828181BFDC0980F 116831~|~1~|~1~|~01/IMS~|~Split for bridge deck replacement~|~13 - Bridge Rehabilitation~|~6CEE220A7E8490ECC71D905C368D2829F42353D7 100779~|~1~|~3~|~03/NHS~|~Bridge 8601127~|~13 - Bridge Rehabilitation~|~4B83378A04BD1345FA1D7522D4570428F5149B9E 100779~|~1~|~2~|~02/NHS~|~US-20 Resurf from SLM 14.33 to 20.20~|~05 - 4R Maintenance - Resurfacing~|~0E3B23698C41080DAD69D3FC9F96D4F9A37008C8 100779~|~1~|~4~|~04/STR~|~split for bridge SFN 8601097~|~13 - Bridge Rehabilitation~|~CF50AFF120201920F6F10E01682F2A777E6B69FD 100779~|~1~|~1~|~01/STR~|~US20 from SLM 12.03 to SLM 14.33~|~05 - 4R Maintenance - Resurfacing~|~E6E12CB08AEB7A4E704A892257C03C82E8A71658 109821~|~1~|~1~|~01/SAE~|~Guardrail installation and upgrades on various county roads in Clinton County.~|~21 - Safety~|~00588C0616D04661F2C4C68D340B327EB54D0574 106469~|~1~|~1~|~01/S>2~|~Sockline CIPP storm sewer HAM-128-0562~|~44 - Other~|~528708BF31E75CD2F3D3E763865C5DE75E85012D 106469~|~1~|~2~|~02/STR~|~Sockline or Slip line small culvert CLE-133-0309~|~44 - Other~|~A1DA06F75A2310C4FF947260810F6A4F7F52DF36 106469~|~1~|~3~|~03/NHS~|~Sockline or slip line small culvert CLE-52-0236 - HAM-50-0278.~|~44 - Other~|~B7DAEE186CB038D20CDEA7A6EBC4E16ADE23343C 110665~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EF257D434EC5064CB8254022BD196B860B08A202 81689~|~2~|~2~|~02/NFA~|~General System asphalt resufacing on JEF-524-0.00 to 0.26; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~AD8F91E24CB85D1735852BA5437478E22D22A56A 81689~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on HAS-151-11.12 to 12.90, JEF-43-20.98 to 21.71, and JEF-164-1.06 to 6.19; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~39192E692018F0672685FA861F06D3C6F6BD9A0B 109568~|~1~|~1~|~01/STR~|~Resurfacing CR5 from 0.00-11.605~|~05 - 4R Maintenance - Resurfacing~|~14C70C2F3B3E7EBE39B472D5B30DEA0BBCDC19FA 109568~|~1~|~3~|~03/S5K~|~Resurfacing CR 25 from 0.00 - 0.572~|~05 - 4R Maintenance - Resurfacing~|~87E08929E5B11B22CA33849B4D8B296A684B41E7 109568~|~1~|~2~|~02/NFA~|~Resurfacing CR25 from 0.572-10.44~|~05 - 4R Maintenance - Resurfacing~|~7B84879AD88CBE777CA6123773D903FA982EFAAE 78152~|~1~|~1~|~01/IMS~|~Interstate pavement resurfacing I-71 NB ramp at Gemini signs & pvmt markingsSeal median barriernoise wall panels~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AA427EB6999F2879CE303749D7EEF328CF467F7F 78152~|~1~|~2~|~02/IMS~|~Minor bridge workSFN 2508354, FRA-71-29.25 under Park RdSFN 2508419, FRA-71-29.83 over Worthington GalenaSFN 2102277, DEL-750-8.93 under Polaris PkwySFN 2102293, DEL-71-0.91 under Gemini Pkwy~|~05 - 4R Maintenance - Resurfacing~|~C2AEC1A8E24FB92893C3DD76B84EA60EDEB668C7 78152~|~2~|~3~|~03/IMS~|~Part 2 Interstate. 90/10 Fed/State: FRA-71-18.52 to 19.09~|~05 - 4R Maintenance - Resurfacing~|~EE29CBA6944136404FB1821DE7A7B8D4C739412F 107879~|~1~|~1~|~01/STR~|~All work in this project. Funds from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~34E77C686FF62E35F86279BA3ECBCC5F30E84F83 123285~|~1~|~1~|~01/SAF/HOL~|~Pavement marking project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~FC11FB60EDF78030768EAD3265687297B509F82B 105138~|~1~|~1~|~01/STR~|~plan split for the pavement work in the rural sections:CLE-131: SLM 8.51-11.98~|~05 - 4R Maintenance - Resurfacing~|~8D9ED8540099C94F7B40E013C215E384D5B91332 105138~|~1~|~2~|~02/S>2~|~plan split for the pavement work in the large urban section:CLE-50: SLM 2.21-2.26CLE 50: SLM 2.30 -2.87CLE 50: SLM 2.87-3.49CLE-50: SLM 3.49 - 4.60~|~05 - 4R Maintenance - Resurfacing~|~25ADA20B63E12987DE719DB026C5AFEE582B19A1 95236~|~1~|~1~|~01/IMS~|~Four lane mowing in multiple districts on the interstate.~|~04 - Reconstruction - No Added Capacity~|~2DB01F231531575DB76FA358277836737EE92A9C 105126~|~1~|~1~|~01/S<2~|~Culvert Replacements~|~04 - Reconstruction - No Added Capacity~|~90CF6FF4B185C09A1505EE87E8DD2E22A3B427F2 115478~|~1~|~1~|~01/NFP~|~Resurfacing parking lot and access road in the TRU Mosquito Creek Lake Wildlife Area.~|~~|~091BDF0712FF5B62E2CBF08B4AA3F7342A53E77F 126747~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~~|~8B0059DD481B25034CF4E121CD677C6D7E3C62BA 100561~|~1~|~1~|~01/IMS~|~Plan split for all roadway and pavement work within the project on CLI IR 71 and GRE IR 71~|~05 - 4R Maintenance - Resurfacing~|~12BDB7C9E13D29EFDB12B1325E84F3FA922A2A5B 86652~|~1~|~3~|~03/NHS~|~Asphalt overlay on structure:2504596 FRA IR70 17.47 Intersect: S 3Rd St(Us-33) Over I-7003/NHS/BR/~|~05 - 4R Maintenance - Resurfacing~|~2840687FE99346366C82726576F979BC995D88BE 86652~|~1~|~2~|~02/S>2~|~Columbus urban pavement workFRA-33: SLM 17.59-20.69 (Livingston from 4th to College)02/S>2/PV/~|~05 - 4R Maintenance - Resurfacing~|~332DFF50F6DF9073AB301EF22CAC7E7093BD040C 86652~|~1~|~1~|~01/NHS~|~Columbus urban pavement workFRA-33: SLM 17.45-17.52 (Third St from Fulton to Livingston)FRA-23: SLM 10.65-10.72 (Livingston from 3rd to 4th)01/NHS/PV/~|~05 - 4R Maintenance - Resurfacing~|~598019F02EEE45C43301CECEDFD6CD2BA8931583 86652~|~1~|~4~|~04/S>2~|~Deck patching and sealing on structure:2501635 FRA US33 20.4 Intersect: Alum Creek04/S>2/BR/~|~05 - 4R Maintenance - Resurfacing~|~BE7A6519ACC1621C3A5FB7F9A68D42585207A585 98649~|~1~|~1~|~01/IMS~|~3 bridges~|~44 - Other~|~B27E298564DC30012951C2EB8A6AFA40368382E4 104265~|~1~|~1~|~01/SAE~|~Upgrading guardrail and end terminals on various county routes throughout Trumbull County.~|~21 - Safety~|~E0559DDF1FD341BB4D88ECEDA74A4B4CC8A4D56A 90879~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/OT/CAMB" - City of Cambridge SRTS project funding 4SC7 (100 Federal) - CAP $190,000.00 for sidewalk, curb ramps, school zone flashers and pavement marking.~|~28 - Facilities for Pedestrians & Bicycles~|~C0462A16C1E754FCF3AB5195244AC93DB8DC7612 122873~|~1~|~1~|~01/NFP~|~All work included in this split.~|~44 - Other~|~C61355FEDFF923818194223D87EB38A8B435CE7D 112198~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4.~|~21 - Safety~|~5DDC55D7B3081D8BE5874B55BD0AE3559828BA28 118438~|~1~|~1~|~01/STR~|~Rehabilitation of MUS SR 83 14.30 ~|~13 - Bridge Rehabilitation~|~F02EFC47532D89C1A9CD2E2BAD43F0A78F56A698 111651~|~1~|~1~|~01/S>2~|~Repair existing Clermont County roads by repairing failed areas, pre-leveling, berm repairs and resurfacing. Final pavement striping and RPMS will also be included. Micro-surfacing will also be performed in several areas with high accidents.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~561FE5DB21D9972CFD4245BB4B41DD18A1515F1A 95923~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State - No CAP- Resurfacing with related work on Per-US 22-6.77 to 14.27~|~05 - 4R Maintenance - Resurfacing~|~26056FA0EFFF72712142225658BE00A06BB41D2E 101975~|~1~|~1~|~01/STR~|~Federal STP funds from CEAO. 80% federal with the 20% match provided by Putnam County. Funds needed over the cap provided 100% by Putnam County.~|~05 - 4R Maintenance - Resurfacing~|~20F5CC944A29B6249B3CA7C0107FAEDFFD9AF010 102766~|~1~|~1~|~01/STR~|~This plan split is for work on rural bridge.~|~10 - Bridge Replacement~|~EC2F7529E0FFA69DDFC42FF45E84E40B2BAB27ED 105292~|~1~|~1~|~01/STR~|~Resurfacing of TUS-258~|~05 - 4R Maintenance - Resurfacing~|~BE348A90F286935B6035A8494C400B07AFB6D568 114515~|~1~|~1~|~01/NHS~|~Work on the HAM-50-0376L Bridge that carries US 50 over the Great Miami River and HAM-50-1903L Bridge that carries US 50 over the Mill Creek and a railroad. O~|~47 - Bridge Preventive Maintenance~|~836926E56459BD319A29B2C935E1004826A4ABE7 114515~|~1~|~2~|~02/NHS~|~All work associated to the HAM-50-0376R (eastbound) bridge over the Great Miami River. This bridge is a District funded bridge and is therefore a separate funding event from the left bridge.~|~13 - Bridge Rehabilitation~|~6C8923549023FDA458643E5103006AC4CBCFB729 110506~|~1~|~1~|~01/MPO~|~Mill and resurfacing with full depth repairs where necessary on N. Detroit Street from Church Street to Kinsey Road.~|~04 - Reconstruction - No Added Capacity~|~608822B2F6EB26864C8D0AEC8132758C653C5F9C 88808~|~1~|~3~|~03/STR~|~Bridge Work for SFN 7004885 RIC-95-0.89 (Bridge under 20 ft)~|~04 - Reconstruction - No Added Capacity~|~497740FE0424992684E884EC349252D5E414F6D4 88808~|~1~|~2~|~02/BRO~|~Bridge Work~|~13 - Bridge Rehabilitation~|~C631EC5E3D53916A9266A63020A48DAB032BA4A7 88808~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~D771EFFDBEA4BDC89F662C5026457D76695A78B3 108370~|~1~|~1~|~01/MPO/BARB~|~Concrete pavement rehabilitation on State Street and Wooster Rd in the City of Barberton.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B8B0D5387B3B67EB524C46E0D617B6552A884C80 108370~|~1~|~2~|~02/S>2/BARB~|~Waterline relocation.~|~43 - Utilities~|~BD6C8FC15B51282EA50ECE01E991867F94791119 108370~|~2~|~3~|~03/SAF/BARB~|~Extend Holmes Ave from 3rd St to Wunderlich Ave in the City of Barberton.~|~01 - New Construction~|~BC4A6AC9C91DB2D9D7A5AF797E1659C30D266D47 91550~|~1~|~1~|~01/IMS~|~Remove and rreplace the existing reinforced concrete deck on bridge (BEL-70-1223, SFN 0702315). Repair substructure units as needed and paint structural steel. Provide new approach slabs.~|~13 - Bridge Rehabilitation~|~6203CAA1B459654FC203815B140874CA8BBBDB7C 103645~|~1~|~1~|~01/S<2~|~DSR BEL-018~|~~|~4654A8ABA5B189603ECBBDA0A0E140372E77A8D2 124565~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded scope to connect North Coast Inland Trail sections in Clyde~|~28 - Facilities for Pedestrians & Bicycles~|~F5E42CF84EFC7717C0363C94D09ECB2255BC42F7 121630~|~1~|~1~|~01/NHS~|~NHS pedestrian improvements ~|~28 - Facilities for Pedestrians & Bicycles~|~51337E8A141ACDE584099FF76FB8C0AD7EF5B219 121630~|~1~|~2~|~02/S>2~|~STP pedestrian improvements~|~28 - Facilities for Pedestrians & Bicycles~|~027D49E7849C766E8BB0EF8859B93E3F695E8EE0 115717~|~1~|~1~|~01/IMS~|~Replacement of existing pavement and miscellaneous items (69%)~|~~|~86F3D3985A9B9B48749414DE75B187C76D700B1E 115717~|~1~|~2~|~02/IMS~|~Pavement and Misc Items associated with Pavement widening (31%)~|~~|~E25BBC7914C8701284094778BF71C9462B5D2BA1 115717~|~1~|~3~|~03/IMS~|~Item associated with the removal and replacement of existing bridges (69%)~|~~|~E8C701E6C801D3B10A0A0CF0400EDB30988FD782 115717~|~1~|~4~|~04/IMS~|~Items associated with widening of bridges (31%)~|~~|~E8FF956A33168EE53E21A094CBAA3DF92B152D57 115717~|~1~|~5~|~05/IMS~|~Items associated with Bridge Rehab on SFN 4903218 (MAD-71-4.708)~|~~|~AE97785330B416724B2D1E4263F864780671FA52 127009~|~1~|~1~|~01/SAF~|~Upgrade traffic signals on US 23~|~21 - Safety~|~E800C12D768D299D5AC79658C6D4E577B81169D8 97021~|~1~|~1~|~01/SAE~|~Guardrail repair/replacement on various County routes in Mahoning County, Ohio.~|~21 - Safety~|~A936E0D29E9A41EFD7419AF831B741D6A7758EDE 105867~|~1~|~1~|~01/IMS~|~Added CO CO Engr 01~|~17 - Construction Engineering~|~C280EFF94108D9384B695B06159E72D303EBB98D 122226~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR80-H~|~~|~BEEB41839D61809A55797A4A0267A5EC91126181 112594~|~1~|~1~|~01/IMS~|~Interstate plan split: DEL-71-1.60-11.55~|~05 - 4R Maintenance - Resurfacing~|~BD608CBDFEC38BCAD27384EE648F80C7FC06B8F7 119186~|~1~|~1~|~01/BRO~|~Plan split for WOO-281-0666 bridge~|~13 - Bridge Rehabilitation~|~EFEB6FFBB11F66CD6043E53AC7D32D3CAF39511E 117526~|~1~|~1~|~01/IMS~|~Plan Split for the Pump Station and CSO work.~|~03 - Reconstruction - Added Capacity~|~F301DE27BBADE9C4D58649ADC26C86C0F409E7F8 88913~|~1~|~1~|~01/IMS~|~Replace existing bridge (BEL-70-1843, SFN 0702706) with a new steel beam bridge. Provide new full width approach slabs.~|~13 - Bridge Rehabilitation~|~3A9BA7F78FF3369CC70E04E2F0C885D145AB3417 87610~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Annual contract for placement of Fast Dry Striping within District 5 on IR; US; and SR~|~21 - Safety~|~44D0C6CAD9F1D53AA968D50D047D37F7400EDA77 118470~|~1~|~1~|~01/S5K~|~Large City Funding for FY2024 ~|~05 - 4R Maintenance - Resurfacing~|~37469601CA6FEB5A614B83012294639B098B2737 105814~|~1~|~1~|~01/IMS~|~Split for bridge painting work~|~47 - Bridge Preventive Maintenance~|~8CDE0FBA324E7CAD2E47006A1FD2C5C8BF72E8E4 97478~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - Lic-TR 303-02.87 (Licking Trail Road) SFN 4537009 - BR Eligible for replacement: L=51'; SD/FO=1; SR=35.9; DSR=4;~|~10 - Bridge Replacement~|~A15D1F52C8161A78FB046DE579892AFF06D3F279 126798~|~1~|~1~|~01/SAF~|~Fast dry pavement markings throughout the District~|~21 - Safety~|~52CED1A3BB22DBC45D4346BF1189F509FB98DA25 121438~|~1~|~1~|~01/SAF~|~D10 RPM FY2030~|~21 - Safety~|~FA15A2C43215727F187709481A9F2295317AC1C9 93652~|~1~|~1~|~01/STR~|~From the Defiance Urban Area boundary at 9.08 to the end of the project at the county line. State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~0B9FB74E150F763B031825C641D36B8C9793F65B 93652~|~1~|~2~|~02/S<2~|~From the beginning of the project at Jewell Road to the Defiance Urban Area boundary at 9.08. State and federal funds from the District Preservation Program budget. No local funds. Urban STP funds. Although, this work is inside the Defaince Urban Area, it is outside of the City of Defiance.~|~05 - 4R Maintenance - Resurfacing~|~3BE40A36D07BD72C211AF025AD6EAB5D2CA20D73 89258~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for urban paving funds~|~05 - 4R Maintenance - Resurfacing~|~2AD741A4C82B81968F70A2B0A0207FBA44FCA87F 89258~|~1~|~2~|~02/NFP~|~Split 2 for items of work not eligible for urban paving funds paid at 100% local cost~|~05 - 4R Maintenance - Resurfacing~|~0498DC8CCEC76D1D40891EC45C585A31405D56D3 112652~|~1~|~1~|~01/MPO~|~Resurfacing North River Rd from Leavitt Rd to Elm Rd.~|~05 - 4R Maintenance - Resurfacing~|~70F3FC82A9ADEAAC6A13749242E122885CF15B50 80526~|~1~|~1~|~01/ERD~|~Improvement of Sarah Street in the Cty of Tiffin (Heidelberg Univ).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A9B87F182BD11BB2ED10877997E379664DB60D9D 117682~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds~|~05 - 4R Maintenance - Resurfacing~|~126B64646D9863CF72A95C6C91DBA34B75EDD87B 103957~|~2~|~2~|~02/NHS~|~This plan split covers all work associated with PID 103958~|~08 - Bridge - New Construction~|~F64629518476C65C07355DF996B3ED38CE61D016 103957~|~1~|~1~|~01/NHS~|~WB CLE 32 exit ramp to CLE CR 55.~|~04 - Reconstruction - No Added Capacity~|~002DC7EC328A3814C3B7E5C2E1A0709ECE490EFB 122947~|~1~|~1~|~01/IMS~|~Crack and seat existing concrete pavement and pave over with asphalt overlay.~|~04 - Reconstruction - No Added Capacity~|~9E4CEEAE387DB65FA45EAA7250946FA26E15CFF9 114482~|~1~|~1~|~01/NHS~|~Funding split for TSMO improvements~|~04 - Reconstruction - No Added Capacity~|~0F4BFE7D87C5D2CEC3EB7EFDCC79F906F8ACBE6B 121335~|~1~|~1~|~01/STR~|~STP Plan split.~|~05 - 4R Maintenance - Resurfacing~|~ACFF673F19D951D588369481356721FE33348ED7 121335~|~1~|~2~|~02/S>2~|~STP 200K plan split. ~|~05 - 4R Maintenance - Resurfacing~|~81ADF21425AD6B97AF1D4D3E258BF6600235AF6B 90432~|~1~|~1~|~01/NHS~|~Bridge replacement project. WAS 7 3457 (SFN 8402345). NHS route funded 80 federal/20 state.~|~10 - Bridge Replacement~|~1AF8EE88B92D3681E745AD345817E8DE6B74099C 111341~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail~|~21 - Safety~|~3DE6B9293639D3F0FCE76D7AB827A87A5EF21298 111341~|~1~|~2~|~02/SAF~|~Plan split for District 3 Preservation funded run of guardrail~|~21 - Safety~|~B40F619E9DA8D0B66F245B2B975C16D18156FE88 100504~|~1~|~1~|~01/STR~|~HIG 62 (10.38-12.26)~|~05 - 4R Maintenance - Resurfacing~|~4F48D9CB4AAC2ECBD02B9F2E786A2698CA0C0294 100504~|~1~|~2~|~02/S<2~|~HIG 62 (12.26-13.32)~|~05 - 4R Maintenance - Resurfacing~|~12582469EED62F190B67DD773A9C9351CCDD472B 100504~|~1~|~3~|~03/S<2~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~E6F71B448A08B53CE40FDEF6B0243D55A833A28A 100504~|~1~|~4~|~04/SAF~|~Safety funded centerline rumble stripe.~|~47 - Bridge Preventive Maintenance~|~A577801FFF06F9EC70A3954E0527AE9EE7CEC6F0 98196~|~1~|~1~|~01/NFP~|~District Preservation Program - 4PS7 (100% State) - No CAP - Routes in Coshocton, Muskingum and Guernsey Counties~|~21 - Safety~|~FA083EEF75608B3162647891BFDFA46A47A79D6A 118791~|~1~|~1~|~01/IMS~|~Smoothseal MED-71-15.790 to 26.687Bridge maintenance work included with project~|~05 - 4R Maintenance - Resurfacing~|~F6C2392ABE899C76703A5128B0BA4B8C1C721CDA 94289~|~1~|~1~|~01/BRF~|~Improvements to Bridge No. BUT-TR 134-7.36 which carries Yankee Road over Dick's Creek. SFN 0930946~|~13 - Bridge Rehabilitation~|~DBE5B5B9E47478EE0FFCAD36BBE45B7E96A99FA7 103824~|~1~|~1~|~01/STR~|~Bridge repair on rural routes.~|~13 - Bridge Rehabilitation~|~427E89F2456471594CD8E9BDB19A698D9D3B270F 103824~|~1~|~2~|~02/IMS~|~Bridge repair on Interstate bridges.~|~13 - Bridge Rehabilitation~|~20B4485BB824D8DFE24D9C2ABDAC522A3BDD12FB 116824~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A5A919C5220845044226C2138BB1D16FE1A7CBEA 98647~|~1~|~1~|~01/SAF~|~Pavement markings~|~21 - Safety~|~7184D41921AAF25BFC3C9965178BC50C02088A49 104635~|~1~|~1~|~01/MPO~|~Resurfacing State St from SR 45 to SR 305 in Champion Township.~|~05 - 4R Maintenance - Resurfacing~|~3D84F9EE3BCD7E0A5A3A62577FC1902532A6B1F1 105569~|~1~|~1~|~01/NHS~|~Bridge Repair.~|~17 - Construction Engineering~|~CD90E7921F57440787EF773633A26E21087C6A11 120366~|~1~|~1~|~01/NFA~|~NOB-CR-62-0.80 SFN:6136151~|~04 - Reconstruction - No Added Capacity~|~D0BACB71292B08FF38A21A8F612356C8ED3B48A7 114938~|~1~|~2~|~02/NHS~|~Replace and repair broken noise wall panels on various NHS routes~|~20 - Environmental Only~|~94A2404E8E7FE970F6C81D5762D0690547919CB6 114938~|~1~|~1~|~01/IMS~|~Replace and repair broken noise wall panels on various Interstate routes~|~20 - Environmental Only~|~3B16979BD4D2770625BBC4C8C2F86431BC453C2B 111362~|~1~|~1~|~01/NFP~|~Construction of new Akron Outpost.~|~01 - New Construction~|~1D9D81F3DC7781DCB9DF2770B4F36EEB741553BE 100370~|~1~|~1~|~01/IMS~|~Crack sealing, minor pavement and bridge repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C0AB96792A9719DA8C314BD1E7BCB5614B6B00A 100370~|~1~|~2~|~02/IMS~|~Perform maintenance activities on mainline structures.~|~13 - Bridge Rehabilitation~|~A2BE3110CD870ED6250983D918739AA7CBA2DD11 101493~|~1~|~1~|~01/STR~|~DSR# BEL-002~|~~|~ADEDEF127A24C8048ACF881456A3E0D581700090 113464~|~1~|~1~|~01/IMS~|~Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction of a wall or regrading of the channel.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~66B3A5EAE1B8FBA07BEA13718F68EF452451925B 123553~|~1~|~1~|~01/NFP~|~HS 2031~|~44 - Other~|~5D4A2D71D4FFAD41E10A1EB0A7AAB2F5B4774FF1 125808~|~1~|~1~|~01/IMS~|~Signs~|~44 - Other~|~3E36C0223C6F54468337D2469BFE22E3C1651D4B 118912~|~1~|~1~|~01/STR~|~Crack sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CAFEAF5E308906473C9984362B7BF9445CB8C147 110063~|~1~|~1~|~01/S<2~|~Landslide repair project. GAL 588 11.00. 100% State ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B6BB4DF2BDBF5420442DBF2D57020F99AA7AF627 87253~|~1~|~1~|~01/STR~|~US68, 41.08 - 45.88 Resurfacing Project It is proposed to resurface the highway with asphalt concrete. On US68, begin at the south corp limit of Fayetteville north thru the village and terminate at the Clinton County line.Pave thru brdgs on US68:0802018 41.42 Intersect: Solomon Run 0802077 45.08 Intersect: Trib W Fork 80/20 split ~|~05 - 4R Maintenance - Resurfacing~|~3DF2175770FCCBC9ABA67EBD200FEE290BB75B6F 87253~|~1~|~4~|~04/NHS~|~BRO US 52 4.25 - 10.50 Resurfacing ProjectBrdgs for Rehab on US52:0800813 5.52 Intersect: White Oak Creek 0800856 BRO US52 7.82 Intersect: Straight Creek 80/20 split ~|~13 - Bridge Rehabilitation~|~567B74A1108975F2A8B1C37872BBB8F52D6377D6 87253~|~1~|~3~|~03/NHS~|~BRO US52, 4.25 - 10.50 Resurfacing Project It is proposed to resurface the highway with asphalt concrete. On US52, begin at the west corp limit east thru Higginsport and terminate 0.85 mile east of TR255 (Pisgah Hill Road). Pave thru brdgs on US52:0800783 4.41 Intersect: Hog Run 0800880 9.32 Intersect: Trib Of Ohio River 0800902 9.72 Intersect: Levanna Branch Stream 0800937 9.99 Intersect: Kope Hollow Stream 0800961 10.41 Intersect: Tributary Of Ohio River 80/20 split ~|~05 - 4R Maintenance - Resurfacing~|~8975A45A3202AD5EC8E427518F12DFD666AC4F51 87253~|~1~|~2~|~02/STR~|~US68 41.08 - 45.88 Resurfacing ProjectBrdgs for Rehab on US68:0802042 44.12 Intersect: E Fork Little Miami River 80/20 split ~|~13 - Bridge Rehabilitation~|~99BFA9651CB87C918D2AF5D24F7CED7D33E1BB12 115574~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~F80F5FAEDD01101CB10C40789E7E144D0530BA2E 86699~|~1~|~2~|~02/NFA~|~Not on any Fed Aid System: ASD 179 0.00-9.72~|~99 - State Preventative Maintenance~|~9C4F19B10D112B02ACB79922463613A286A7C38D 86699~|~1~|~1~|~01/STR~|~STP Rural: ASD 604 0.00-3.38 / ASD 89 0.00-4.68 and 5.40-12.03~|~99 - State Preventative Maintenance~|~7149CA04DC7CD4F0D8CF27F1C5D51B370E27CE68 112976~|~1~|~1~|~01/NHS~|~Repair bridge size twin culvert BUT-4-0930 over Shaffer Creek~|~13 - Bridge Rehabilitation~|~5804576F6D8C33A2942CED606B566035482C38CA 112976~|~1~|~2~|~02/STR~|~All costs associated with the repairs to bridge size culvert BUT-129-0230~|~13 - Bridge Rehabilitation~|~06CDFD18956833712F99BF02B5B5730B88CA9726 93960~|~1~|~3~|~03/NFP~|~Urban Paving Ineligible items.~|~05 - 4R Maintenance - Resurfacing~|~0F835C8E4EC676C8282AA9ECEAB472C24D9F9379 93960~|~1~|~2~|~02/NHS~|~For piece between SLM 24.79 and SLM 25.07 (end of project).~|~05 - 4R Maintenance - Resurfacing~|~9107E3A06BF33497B8FA2C97D7C209814DDE10AF 93960~|~1~|~1~|~01/S>2~|~Urban Paving eligible items from SLM 20.65 to SLM 24.79~|~05 - 4R Maintenance - Resurfacing~|~BBB7216B97ACE48C35C4AF98C4554CE87325E619 95089~|~1~|~1~|~01/S<2~|~Extend East Pine St from SR 57 to Walnut St and from the east end of Pine St to the east end of Chestnut St across the JGL parking area~|~01 - New Construction~|~C23C2A60745EAC28C8849816C4CE9255AC2CB2EA 114707~|~1~|~1~|~01/IMS~|~Bridge replacement of LUC-475-11.38/12.38~|~~|~249340D0332CB2AAE054632C35D20C18F29D8100 120755~|~1~|~1~|~01/NHS~|~Federally eligible resurfacing work utilizing STBG funding from the MPO. ~|~05 - 4R Maintenance - Resurfacing~|~6F8DF3AD02B03CDC96DDE1E73631EAC536208CD5 126637~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 148 over Captina Creek.~|~10 - Bridge Replacement~|~21F0F0D105C3B975A36E417B9153B7CBF17FAB4D 121459~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~3142DECEA2683E529B5AFEC13829B01578AB3750 102915~|~1~|~1~|~01/SAF~|~Safety improvements on Fitchville River Road.~|~21 - Safety~|~B34888D3EC30E5AFA0ACD2B5316CFA134260AA51 125823~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~4F1EC2E608486B782689C097C02030F06135C580 105322~|~1~|~6~|~06/IMS~|~Project eligible utility items: waterworks, sanitary, electric, traffic surveillance~|~43 - Utilities~|~5AEA1C537E02D2803DFD8006FD9A194CF8EF2BC2 105322~|~1~|~5~|~05/NHS~|~new bridges FRA-70-1461P, FRA-70-1476, FRA-70-1498, and walls I-7, I-13A~|~08 - Bridge - New Construction~|~00C64A50BE430D4FCA440CE18CBAF5CAADCC49D5 105322~|~1~|~7~|~07/MPO/Cols~|~MORPC/Columbus funded enhancements~|~31 - Landscaping & Other Scenic Beautification~|~57A729E0C6898685B03D91567B151EC04DA7A969 105322~|~1~|~2~|~02/NHS~|~IR 70 widened pavement (45%) structure FRA-33-1747; SFN 2504596 (45%), and walls I-8A, I-9A-1, I-9-A2, I11, I-13-2, I-13D, and I13T (45%)~|~03 - Reconstruction - Added Capacity~|~F5E9F86C06B28857A2D7FF7F007A56033A9135D9 105322~|~1~|~1~|~01/IMS~|~IR 70 existing pavement reconstruction (55%) Parsons Ave, Childrens Dr, Mooberry St. (100%), structure FRA-33-1747; (Existing SFN 2504596)(55%), and walls I-8A, I-9A-1, I-9-A2, I11, I-13-2, I-13D, and I13T (55%)~|~04 - Reconstruction - No Added Capacity~|~70DC7F3DF6D4FD05271C4B6B5464F805D58D1B3B 105322~|~1~|~3~|~03/IMS~|~bridge replacements - existing width FRA-1493 L&R (existing SFN's 2504774 & 2504804)(2/3), walls I-13B, I-13E (2/3)~|~10 - Bridge Replacement~|~825AA0C79689AE4DCFBD1EAF0433D79EBDF95E35 105322~|~1~|~4~|~04/NHS~|~bridge replacements - widening FRA-70-1493 R (existing SFN 2504804) (2/3) and walls I-13B, I-13E (1/3)~|~10 - Bridge Replacement~|~6EA5D0E62683E4097B1AC9CD93257E83F04A2E5F 105322~|~1~|~10~|~10/NHS~|~ITS funded items~|~04 - Reconstruction - No Added Capacity~|~F2C1D48800B6DB852C903F1872D6BDC28AFE7EF1 105322~|~1~|~8~|~08/S>2/Cols~|~100% City of Columbus items (brick crosswalks)~|~04 - Reconstruction - No Added Capacity~|~B94E945E100FF3C1D1B9F764B9DBBD6E87C3BEF1 105322~|~1~|~9~|~09/ENH/Cols~|~Incremental items (brick sidewalks, granite curbs) - Columbus to pay costs above standard items~|~04 - Reconstruction - No Added Capacity~|~1E496D7066DD8EE3EC0CC45BC6841A535CD264F7 105322~|~1~|~11~|~11/SAF~|~Repair of damage caused by vehicle accidents~|~04 - Reconstruction - No Added Capacity~|~353CF3F9553FA7ADF32174A5FFA4A674E92FA15F 119046~|~1~|~1~|~01/S>2~|~Columbus urban area plan split for culvert/storm sewer upgrades on FRA-3.~|~66 - Resilience Improvement - Highway Project ~|~3267AF68A77EDA10C94201EBABB55669C9310146 112923~|~1~|~1~|~01/SAF~|~Signal replacement project on HOC 664 15.85 and install a right turn lane on Chieftain Drive in the City of Logan. Safety Funded 90% Federal/10% State.~|~21 - Safety~|~05024B7FDFDB55844963FBF3C37734BE99324C0D 112923~|~1~|~2~|~02/SAF~|~Signal replacement project at HOC 664 15.65-15.75 and Old McArthur Road intersection. Work includes upgraded signal heads and upgraded detection. Safety Funded 100% Federal.~|~21 - Safety~|~A330EB96858A408DE746ABE70359FEB6F917676B 119873~|~1~|~1~|~01/BRF~|~Plan split for bridge replacement work.~|~10 - Bridge Replacement~|~32BC9D6F74FA030FACD2B5C7F2E4FFA8D4078907 106305~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4.~|~21 - Safety~|~8120087AFA5418944E356EF8DB51C6547C22EE9E 118836~|~1~|~1~|~01/S5K~|~Resurfacing project.~|~05 - 4R Maintenance - Resurfacing~|~BC90D5AECAFBA62CF5D537BFD9040AF03A86EC7B 126368~|~1~|~1~|~01/S5K~|~Roadway improvement & pedestrian enhancements~|~21 - Safety~|~3F6B8438FDC5EFA2442DD9484782CBA53A30D668 125052~|~1~|~1~|~01/NFA/PATA~|~Bridge Replacement of SFN 4563808.~|~10 - Bridge Replacement~|~2596A406B0825B9D822F6C5B1CE6D9371C8CE3CB 102443~|~1~|~1~|~01/STR~|~Herbicidal Spraying in BEL, HAS, and JEF~|~44 - Other~|~6A51306A57C3333242FCB381EF22B6A26D739A65 105922~|~1~|~1~|~01/SAE/FCEO~|~"01/SAE/OT/FCEO" - Fairfield County funded CEAO guardrail project with federal max of $200,000~|~21 - Safety~|~524E189E220C289D5DC9AED27949B042EFFDF045 84156~|~1~|~1~|~01/MPO~|~Replace traffic signal system on Central Avenue and Dixie Drive from Miami Avenue through Alex-Bell Road.~|~21 - Safety~|~D6E8D156985BE9C1762440361F3000D61F62ED06 106038~|~1~|~1~|~01/STR~|~Rural Plan Split~|~~|~B19DDD797311A5CFF8C5480DAC9D194D25F9B2F3 106765~|~1~|~1~|~01/NFP~|~All work is included in this plan split using SAC 4SR7 funds.~|~13 - Bridge Rehabilitation~|~37D64D319BDC559C3600B317F5B0C6BD158A38EB 114308~|~1~|~1~|~01/IMS~|~For culvert work on the Interstate locations.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~25598A3CFD3D9F16F45C22E90345551D4E98D829 114308~|~1~|~2~|~02/NHS~|~For conduit work on the NHS locations.~|~~|~A5CA8269C6B61D25A71BACA350FAD0D915E3A74F 114308~|~1~|~3~|~03/S5K~|~For conduit work on the rural highway with 5K to 50K population.~|~~|~79597642A3481C2B32F15A2CC72199ED97C3D976 114308~|~1~|~4~|~04/STR~|~For conduit work on the rural highway with <5K population.~|~~|~70EAFD58E39B989E76324DFB1282926E26F32D2A 114308~|~1~|~5~|~05/NFP~|~For conduit work on the Non-Federal Aid locations.~|~~|~7C32BAEDB44A41BC40694F3EA4B2B11F1C6BFE2F 101468~|~1~|~1~|~01/STR~|~Pavement Markings~|~21 - Safety~|~35805D72CBF5F173DE6C53459A43062643B4AC9E 89285~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No CAP - Fai-SR 159-00.00 to the 10.57~|~05 - 4R Maintenance - Resurfacing~|~42D0BB681BF92AB2E5A5041502BF745E0F1CE2A5 125501~|~1~|~1~|~01/SAF~|~Plan split for all work associated with roundabout~|~21 - Safety~|~6DED9602B482645B13081DA2E18247A18346BCF8 82963~|~1~|~2~|~02/NHS~|~Plan Split for Crack Sealing the NHS routes included in the project. These routes are GRE-4, GRE-35, GRE-35, GRE-35, HAM-22 and WAR-22 This plan split covers all work on these sections.~|~99 - State Preventative Maintenance~|~674DD5AB0478F4201CEF66E31A987C77A30E676F 82963~|~1~|~1~|~01/IMS~|~Plan Split for Crack Sealing the interstate routes included in the project. These routes are GRE-71, HAM-275 and HAM-275. This plan split covers all work on these sections.~|~99 - State Preventative Maintenance~|~CC73B97114E3A7260DF66F98E9256223A9EBC4FF 81899~|~1~|~1~|~01/SAF~|~Project consists of a partial (2-leg) continuous flow intersection at Beechmont Avenue (SR 125) and Five Mile Road on the Five Mile Road leg of the intersection. This includes relocated travel and left turn lanes primarily along Five Mile Road, a new right turn lane from westbound Beechmont to southbound Five Mile. Project also includes retaining walls, landscaped median areas, and crosswalks with handicapped ramps/walks for pedestrian access.~|~21 - Safety~|~E138F5D3137FD9108B20B529356529F97A11057F 81899~|~1~|~2~|~02/SAF~|~Wall extension being funded 100% by Hamilton County~|~21 - Safety~|~FF44F91ABB32588BE95837A233B90EBEB899B67A 87682~|~1~|~1~|~01/IMS~|~District Allocation - 80/20~|~47 - Bridge Preventive Maintenance~|~E59DADB7B5CCD02069C7DE56F8D2AA8009FA7FD8 77529~|~1~|~1~|~01/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~C45491B327873E521A33071D7C606C6D5BE059FC 77529~|~1~|~2~|~02/NHS~|~Bridge Work: Various Bridges on HUR-20~|~13 - Bridge Rehabilitation~|~7AA8C917AE8EA03BF0F92D2672B10D84F327D5F3 77529~|~1~|~3~|~03/SAF~|~Long Line Pavement Markings~|~21 - Safety~|~F822B2E7F69C00100B7BDBF8C0E4085D58315432 77529~|~1~|~4~|~04/NHS~|~Bridge No. HUR-18-1523L Bridge Hit on Span 2 over Southbound (Westbound) U.S. Route 20~|~13 - Bridge Rehabilitation~|~AE3D57E671DD4F8C71584AE4B5CA1B6E30369DD5 117209~|~1~|~1~|~01/MPO/COLT~|~Addition of 8' sidewalks along Springdale Road from Colerain Avenue to Loralinda Drive. Improvements to the pedestrian crossings.~|~28 - Facilities for Pedestrians & Bicycles~|~0B7DBF3DE3C6138A5B7AB039B8B11D518652E894 126492~|~1~|~1~|~01/SAF~|~CEAO HSIP Safety project to install and upgrade current pavement markings on various county roads.~|~21 - Safety~|~4F3DAA1D68F04490D44EAE7D37CF5A03FCC76F0C 110787~|~1~|~1~|~01/NHS~|~Slide repair BRO 52 16.46~|~04 - Reconstruction - No Added Capacity~|~C751BAC9613AF74878E26D8DBB97F82590881797 105786~|~1~|~1~|~01/S>2~|~Plan split for paving work~|~05 - 4R Maintenance - Resurfacing~|~1BC5C4130B2756E169A2A71F187981D4F7507D1E 88132~|~1~|~1~|~01/IMS~|~add fourth lane southbound, add c-d to anthony wayne-galbraith-wb SR126 and auxiliary lane from shepherd to c-d~|~03 - Reconstruction - Added Capacity~|~D0C14EBBABC921F38ECAEA75D1F04C6F09ABBBBA 88132~|~1~|~2~|~02/IMS~|~rehab of pavement southbound 75 from galbraith to shepherd in conjucntion with major new project to add a lane and auxiliary lane.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~131B267174C85F7F277DC93D06B672A9E3976F47 88132~|~1~|~3~|~03/IMS~|~major rehab of pavement in conjunction with major new to add a lane southbound from galbraith to shepherd.~|~~|~7D1E5E02A88BD5D4AA407EBC61A24640221A5CAF 121024~|~1~|~1~|~01/NFP~|~bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~CEAFD26DF1416061C15C6C796CD5A314DFC286E2 105298~|~1~|~1~|~01/STR~|~Resurfacing HAS-250 and HAS-9 in the Village of Cadiz~|~05 - 4R Maintenance - Resurfacing~|~C38E58D8DA6856153F671389374E0FEA45A945F5 101860~|~1~|~1~|~01/IMS~|~This split is for district bridge sealing.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F2ECCCEF8A780453C04C89869BB19215E039E68 101860~|~1~|~2~|~02/NHS~|~NHS bridges for sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~47EBE3AB01F1C7744802245792E4A55AF367033A 101860~|~1~|~3~|~03/IMS~|~Non major bridge funding event~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C901AB30D19B58C46BA67F954ED16EC8D0F9624D 101860~|~1~|~4~|~04/NHS~|~NHS bridge non major bridge~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FB52E777C2F923BF64C4ED330A726163D60585DE 100971~|~1~|~1~|~01/STR~|~DSR# BEL-003~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9CCE520FDB3A8533E07B54FB69C3FF2E10537D50 100971~|~1~|~2~|~02/STR~|~DSR# BEL-028~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D2C1470D81C364674F723421D44B817C0414100B 102909~|~1~|~1~|~01/NHS~|~NHS pavement~|~~|~D026D75B3E872B04A7BBF3BB122601B09604A114 82835~|~1~|~1~|~01/STR~|~Rural other federal aid. Two-Lane resurfacing project using an asphalt overlay treatment. HOC 327 0.00-4.56.~|~05 - 4R Maintenance - Resurfacing~|~F4B8810E7537F3B8072ABAD96551BE2E89BC1DB4 106776~|~1~|~1~|~01/NHS~|~The project involves the repair of a couple of beams using heat straightening and replacement of damaged crossframes on bridge JEF-22-0590 (SFN 4101804), caused by a hit by an overheight vehicle.~|~13 - Bridge Rehabilitation~|~C7FCB02ACC0761E67174DE35A075E87ABC8BD0AA 106002~|~1~|~5~|~05/IMS~|~Replace structure.~|~10 - Bridge Replacement~|~3C3EBC08A8A8D1E8A395C6004E1BFD64DE706415 106002~|~1~|~6~|~06/IMS~|~Extending length of ramp structure, no added capacity.~|~04 - Reconstruction - No Added Capacity~|~D76CB8A2F975AB593B6C330F93299D1FFACD08B9 106002~|~1~|~4~|~04/IMS~|~Deck replacements and widening for added capacity.~|~13 - Bridge Rehabilitation~|~1206D6B68F7DE2633A58FC9E55A58186B6EE2782 106002~|~1~|~3~|~03/IMS~|~Deck replacements, no added capacity.~|~13 - Bridge Rehabilitation~|~7C317B20164BFF25D25C655B043E3E79404CC1DA 106002~|~1~|~2~|~02/IMS~|~Adding new lane on SUM IR-77 northbound from S Arlington Rd to Killian Rd and SUM-IR 77 SB from Warner Rd to US 224 and adding second permanent lane on Ramp A (IR 277 EB to IR 77 SB) and Ramp B-2 (IR 77 NB to IR 277 EB).~|~03 - Reconstruction - Added Capacity~|~800D701341E364B647BFA8B78F90FB5E8543B164 106002~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement on SUM IR-77 from Arlington Road Interchange to the IR-77/IR-277/US 224 Interchange, section of Warner Road and Ramps B (IR 77 SB to IR 277 WB), B-1 (IR 277 WB to IR 77 SB), C (IR 77 NB to IR 277 EB), C-1 (IR 277 WB to IR 77 NB), C-2 (IR 77 SB to IR 277 EB), D (IR 277 WB to IR 77 NB), D (Arlington Rd SB to IR 77 NB).~|~04 - Reconstruction - No Added Capacity~|~DEDF883566DA4D19F42AA4DAEB285FE6CC3BF43F 106002~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~8EADE16675061D8D174BA9718D1D3B2F4EED4047 114426~|~1~|~1~|~01/STR~|~"01/STR/BR/ " 80% federal (4PF7) and 20% state (4PS7) - repair of SFN 6403573~|~13 - Bridge Rehabilitation~|~EA6661DADF815A3D847A3F5E73CAC4E164BBD05D 97161~|~1~|~1~|~01/S>2~|~Long line striping on various routes throughout Stark County~|~21 - Safety~|~C387826FEBD4825E3BA23185D711F8747D22CD80 117105~|~1~|~1~|~01/MPO/GREE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D684A8707BBE3D1510CE9DDFEBCF6A56DD70D56E 107962~|~1~|~2~|~02/NFA~|~WAY SR 0604 04.29-07.56- Chip Seal~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C79494C9FF1B81350421344DAD82DCF95DAC173 107962~|~1~|~1~|~01/STR~|~ASD SR 0060 26.227-30.31; MED SR 0162 02.973-07.29; MED SR 0162 07.81-12.44; WAY SR 0094 00.25-06.701; WAY SR 0539 08.74-12.73; WAY SR 0604 00.02-01.006; WAY SR 0604 01.133-03.798- Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~7BF62BF3F8C72718D380B4F583683B2A9861D719 104269~|~1~|~1~|~01/NFP~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~B6928A41BC9372EA8B6F4E79DE062602F92FA10C 121808~|~1~|~1~|~01/MPO~|~Plan split for MPO funded eligible work for resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9079FA0150ED22383C76FAB8674782DE8E16B58C 112275~|~1~|~1~|~01/BRF/KCEO~|~Ohio Bridge Partnership Program - 5BP7 (80% Federal) / LNTP ( 20% Local TRC) - See CAP Comment - Replacement of SFN 4235843 Caves Road over Barney Run.~|~10 - Bridge Replacement~|~B3A556391F2D546F75CF44424648E3FEF4133C9F 115053~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 518 over Willard Run.~|~10 - Bridge Replacement~|~431C7C450138CE1E6A7CB8CEBE3BCC315CE5E3BE 116744~|~1~|~1~|~01/STR~|~Culvert replacement plan split for MAD-42-19.767.~|~44 - Other~|~57F57AEB7718D27F0F266A4DA72281999FC4C2D0 110593~|~1~|~1~|~01/BRO~|~All the work to replace the bridge. District federal and state funds.~|~~|~1C267B92E9660A336AF73D4CC8DD1E64F7D5326A 115124~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE2C2098BF8E14E2AF4F85DE5345AD63E0F46F6B 118861~|~1~|~1~|~01/NHS~|~Culvert Lining SR 2.~|~04 - Reconstruction - No Added Capacity~|~E46F6BF4A039CCEDB350D041F533F7C62BA05D2B 120606~|~1~|~1~|~01/STR~|~MED SR 0094 07.64-07.94- Pavement Overlay~|~05 - 4R Maintenance - Resurfacing~|~CD5B9128494F1ACA7F58E48489FF2DE17226A4DD 120606~|~1~|~2~|~02/STR~|~Installation of drainage and associated curb on SR 94~|~66 - Resilience Improvement - Highway Project ~|~21510ECAABA98FDED1A432FFBB705254592BCBFE 82524~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 681 0884 (SFN 0504653). Rural other federal aid funded 80 federal/20 state. Bridge is 26 ft in length.~|~10 - Bridge Replacement~|~7A1006292D180CED8FAAC087395C34B267143222 82524~|~1~|~2~|~02/STR~|~Bridge replacement project. ATH 681 0910 (SFN 0504688). Rural other federal aid funded 80 federal/20 state. Bridge is 19 ft in length.~|~04 - Reconstruction - No Added Capacity~|~E30C2FCB87B4A9D6AA20F2ABCD4184FB6A44C0A2 126079~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~5C4D1150733873629BF355EF3D24790A5E1486F7 101022~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4CP7 (100% State) - See CAP Comment - Guardrail Upgrade on various routes within the district.~|~21 - Safety~|~BE5930AC6E3DD59A9368504E08542CCD7E719149 109922~|~1~|~1~|~01/STR~|~District preservation funds.~|~~|~3E408F632B824C963E5E435D4F679FBB5CD55233 125526~|~1~|~1~|~01/SAF~|~Systemic Safety funded plan split~|~28 - Facilities for Pedestrians & Bicycles~|~42426AC1421BDFC7EE3F9ED8C3B40B462F38C4EE 105202~|~1~|~1~|~01/IMS~|~plan split for resurfacing on WAR-71~|~05 - 4R Maintenance - Resurfacing~|~98567F21A464774A707DEE7CAE8D0C0CEB56474B 123765~|~1~|~1~|~01/SAF~|~Plan split for RPM replacement work~|~21 - Safety~|~3068F8CEA97E549EEA73D8B7A58A8E871F0C2BF0 108355~|~1~|~1~|~01/STR~|~Bridge painting project. HOC 374 12.90 (SFN 3704084). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~AE1D2EFFF738C83AC6A6218DFE2FAA128247676B 108355~|~1~|~2~|~02/S<2~|~Bridge painting project. ATH 278 2.94 (SFN 0503347). Urban other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~DA904DFEAD66AADDE26F1D0A9B0FDAE7E633ED8F 105340~|~1~|~1~|~01/STR~|~Microsurface on rural route: LOG SR 708 SLM 0.00 to 0.71~|~05 - 4R Maintenance - Resurfacing~|~4493364BE13BB1A2BDDA12A9161122EBF52656D2 105340~|~1~|~2~|~02/S<2~|~Microsurface on small urban route: LOG SR 708 SLM 0.71 to 2.32~|~05 - 4R Maintenance - Resurfacing~|~0B7AC8462E1FE05ABE79063B835EC1FB85928432 107549~|~1~|~1~|~01/STR~|~Resurfacing TUS-258~|~05 - 4R Maintenance - Resurfacing~|~48BBFBC264518ACBC2CFF74E3B7846A448CEABB4 123611~|~1~|~1~|~01/S5K~|~Plan Split STP 5,000-49,999~|~05 - 4R Maintenance - Resurfacing~|~A6407EA480E7553F1C392DEDF63E2A8448D3AD22 99558~|~1~|~1~|~01/S>2~|~Widening of SR-747 between Princeton Road and Millikin Road from 2-10' wide lanes to 5-12' wide lanes with 4' paved shoulders. Improvements to the roadway profile. Construction of a 5' wide sidewalk on the west side and a 10' wide multi-use path on the east side of SR-747. Construction of an eastbound right turn lane from Millikin to SR-747 and a northbound right turn lane from SR-747 to Princeton Road.~|~21 - Safety~|~2DC274CAF58054856BCC183E038FFE45B54B20AB 99558~|~1~|~2~|~02/S>2~|~Plan split for 100% locally funded waterworks improvements being constructed as part of the project.~|~43 - Utilities~|~C28C75477D642DB8E48B6B8CB3E11D9838E8EBCA 120050~|~1~|~1~|~01/NFP~|~Lighting upgrades/replacements.~|~21 - Safety~|~521616C29A08DBC9AD50F54C513ADB7A6017C9CB 117377~|~1~|~1~|~01/MPO/SEBR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~70235BE583DEACF5DAE5FA71F7D205683DEE4F9F 126360~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~EAA34121DBE73CCB71506F04B59F199C722FDD18 80966~|~1~|~1~|~01/ERD~|~The construction of the pedestrian bridge will use the following federal fund source:1) Earmark OH185 w/TRC (100% Federal)2) Earmark OH185 w/out TRC (80% Federal / 20% Local)3) Earmark OH313 w/TRC (100% Federal)4) MPO Transportation Alternative funds (80% Federal / 20% Local)~|~28 - Facilities for Pedestrians & Bicycles~|~8B1597FB9E903EFEDA184A0F89AD3E58541B4779 80966~|~1~|~2~|~02/NFP~|~Added alternative work items that are 100% local participation.~|~28 - Facilities for Pedestrians & Bicycles~|~59C1EC415AD6A7B3FCCE2FE53B803292550E91FB 109089~|~1~|~1~|~01/SAF~|~Widening of Tylersville Road from a 2 lane section to a 3 lane section. Dedicated turn lanes will be constructed at intersections, and a two way left turn lane will be provided between intersections.~|~21 - Safety~|~971B5CA73546809BFBE96FF788CA6BB8538BB56A 114783~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4.~|~21 - Safety~|~CD671BCF7C1AF532DF8CEC4B5FFE4939290ACFBF 86054~|~1~|~1~|~01/BRF~|~CEAO Bridge Rehab (modify abutments and new superstructure)Local - Fayette County Engineer2432773 FAY CR37 2.96 Intersect: Crooked Creek- Clemens Rd~|~13 - Bridge Rehabilitation~|~83EA016E8E01B5EB349A66DDE50BD6658CD5282A 109067~|~1~|~1~|~01/STR/TUSC~|~Resurfacing on County Road using 80%/20% Federal/Local funds.~|~05 - 4R Maintenance - Resurfacing~|~8D1EEA178F138E6D45BE7A699D3595498ABC2BFC 111160~|~1~|~1~|~01/NFP/ODNR~|~Parks -ODNR - State - 4BF7 (100% State) - No CAP - Resurface in ODNR Salt Fork State Park: R-14 and cabin facilities, F-26 and F-27 parking lots~|~05 - 4R Maintenance - Resurfacing~|~0156EB84741E93CD3832D70841E4B800B53B6534 111160~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~5600B79D9AE805A2DBCD76FFA548B35175F6EEA9 119077~|~1~|~1~|~01/IMS~|~Plan split for project to rehabilitate bridge HAM-275-2016 which carries Mill Rd over I-275. Rehab will include replacing the concrete wearing surface, fence, joints, and bearings. ~|~13 - Bridge Rehabilitation~|~DD380DE781DAA727B0FD23414022F920AF8390C7 91019~|~1~|~1~|~01/IMS~|~Smooth seal IR 75 SLM 0.00 to 4.92 in Miami County.~|~05 - 4R Maintenance - Resurfacing~|~83378B87371CC5D8C0127EAE60A60F445EA8FB8A 102767~|~1~|~1~|~01/STR~|~This plan split is for work on rural bridges.~|~13 - Bridge Rehabilitation~|~790D587E9F34B8DE71CF4E8FF523BEAAA9038152 107337~|~1~|~1~|~01/S>2~|~See linked structure > 20' span.~|~47 - Bridge Preventive Maintenance~|~B84C693D112305DEF962D4FF2988FF7CDB1B4A90 123766~|~1~|~1~|~01/SAF~|~Plan split for pavement markings~|~21 - Safety~|~0BACBC2D7C6345A39411E3BFFCA9B0D926750ADB 96324~|~1~|~2~|~02/S>2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation on Fai-256-05.88 SFN 2303124~|~13 - Bridge Rehabilitation~|~900F3451627B1C2166C241F54CE97F1187AF53AE 96324~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of various bridges on OFAH-Rural routes in District 5~|~13 - Bridge Rehabilitation~|~73ABBE9291EEE3A1063E1A8AADE34C2471E9A224 120704~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay.~|~05 - 4R Maintenance - Resurfacing~|~098D3B41C6955C029C4F2B597E0FA939D4A4B0BE 120704~|~1~|~2~|~02/BRO~|~Bridge Rehabilitation.~|~13 - Bridge Rehabilitation~|~997C4BF69129FC056ED38C45C5356D08A1363618 111369~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer's FY2025 pavement marking project funded by CEAO. 4HB7 - see cap comments.~|~21 - Safety~|~7C6D73ED368CC1D0370AAB5E16210A1652E67D1E 123987~|~1~|~1~|~01/SAF~|~All items of work associated with the conversion of a one lane exit ramp to a two lane exit ramp.~|~04 - Reconstruction - No Added Capacity~|~1392978A06262A05FA87460745E2DE2EEA11AE82 114988~|~1~|~1~|~01/NFP~|~Guardrail Repairs.~|~21 - Safety~|~4DE9E9CA26E5D0269C1A9DD69F199DC7193344F1 104863~|~1~|~2~|~02/MPO~|~Work on E Maple St TBD.~|~05 - 4R Maintenance - Resurfacing~|~31ECF899277F831DEDC480BF7E87688881B4CB13 104863~|~1~|~1~|~01/ENH~|~Work TBD.~|~05 - 4R Maintenance - Resurfacing~|~F7AD4FBF15644283B3D2B9900AD32A555F1DBE4E 104863~|~1~|~3~|~03/MPO~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~C6D3F346C2A82A2CEF5E34F6679D02ACE534249E 119714~|~1~|~1~|~01/NFP/GCEO~|~Resurfacing and related roadway work on CR 95~|~05 - 4R Maintenance - Resurfacing~|~E24B30BA6A57170D8F29CC13CFFBF2E303AE83CA 111451~|~1~|~1~|~01/CMQ~|~Widening of North Fairfield Road from Plantation Place to Shakertown Road to three lanes to provide a center two-way left turn lane. Construction of a sidewalk and side path. Construction of curb, gutter, and storm sewer system.~|~21 - Safety~|~75855A141FA155AB9714757B2B13B98697A41C94 111451~|~1~|~2~|~02/CMQ~|~Widening of North Fairfield Road from Fairbrook Elementary School to Plantation Place to provide a center two-way left turn lane. Addition of sidewalk on both sides of the roadway.~|~21 - Safety~|~9756DD3685F719AE8A5A50D1B8A67E46267FAF9A 101333~|~1~|~1~|~01/NHS~|~Replace structure.~|~10 - Bridge Replacement~|~51608926DEC438FCB6E220FE7E898A14D9FC14BC 98389~|~1~|~2~|~02/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~54C98B05BD4E1637C72A214381E684C42E9AB538 98389~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~F59C07ECC23523F808E6F7196E7F32907D2A3EEA 98389~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~BEEE0F4B2FDDA5D1F0B05EFC9BB7E680BB5C7133 98389~|~1~|~1~|~01/S>2~|~Resurfacing STA 44 8.84 to 12.19 and STA 153 4.00 to 5.17.~|~05 - 4R Maintenance - Resurfacing~|~F42A5FC8093334DAB80286C1CB2BAB11134A2E94 104297~|~1~|~1~|~01/MPO~|~plan split~|~04 - Reconstruction - No Added Capacity~|~73E70459248B1BD3CB4D89AF4EA1AD9843CF9EF6 111537~|~1~|~1~|~01/MPO~|~TMACOG Funded Scope on Newton Rd.~|~05 - 4R Maintenance - Resurfacing~|~D6E2073BCFDA3908680EDDE4FF4F71278D9688CA 111537~|~1~|~2~|~02/S50~|~WOO-25 from 11.76 11.95 - Urban Paving funds~|~05 - 4R Maintenance - Resurfacing~|~A80F227DC53A1D39C446BB8F2D066695BD3EABD8 111537~|~1~|~3~|~03/NFA~|~Plan Split for 100% Local cost, including pavement repair and asphalt rejuvenator~|~05 - 4R Maintenance - Resurfacing~|~2AEDA19D9ED43966719212E2D33AE43DF645F521 125890~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. NOB 821 0.809-7.463~|~05 - 4R Maintenance - Resurfacing~|~7E902683654B67023884B90AFCD11F4CCBF7355E 117387~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~48AD5D8217493218E5DFB5C551C57853D51C493A 111011~|~1~|~1~|~01/SAF~|~Intersection improvement of STA SR 687 at Dressler Rd by realignment of Northern and Southern legs, add raised islands on NW and SE quadrants, reconfigure signal phases and timings and add backplates.~|~21 - Safety~|~881640623A0FF65D4D34A5FF28F50E51C81AFEE0 111011~|~1~|~2~|~02/SAF/AQUA~|~Aqua Ohio waterline lowering work.~|~21 - Safety~|~9BF17D2E674EEEA2435757FD6062B3F766B62EA4 111011~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~8B0E0DF425D3D91C41C5BBB58C54138FACD3368B 94012~|~1~|~1~|~01/SAF~|~100% SRTS funding for multi-use path~|~28 - Facilities for Pedestrians & Bicycles~|~5B173C37E216EBC9775ADE2432CE918614BB20F6 104916~|~1~|~1~|~01/NFA~|~North Canton Schools school bus replacement project~|~44 - Other~|~B63F21580D205842BC5A904FF6C80313A027674A 93531~|~1~|~1~|~01/SAE~|~Add sidewalk along Compton Road between Hilltom and Poage Farm Road, including curb ramps, crosswalks, and signing at intersections.~|~21 - Safety~|~6BA793019A452E5F7CCBB64F6C1191AF719BA035 110443~|~1~|~1~|~01/SAF~|~Intersection improvement project. Work includes signals, markings, curb, and pedestrian improvements. MOE 26 16.85-16.95, MOE 26 16.77-16.80, MOE 78 15.72-15.75, MOE 78 15.85-15.88. Funded 100% state Safety.~|~21 - Safety~|~C81F7BCDC58EA78602025796FDC569B294699C74 110443~|~1~|~2~|~02/SAF~|~100% local items.~|~21 - Safety~|~2190718333DCBC9D54D0913DCF6C8715F59A7F1E 95274~|~1~|~1~|~01/NHS~|~District Preservation Program funds SACs 4PF7 and 4PS7. NHS. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~759F67E74B1F718C56C4F906F6228CCD237FE703 112831~|~1~|~1~|~01/STR~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~27FFE658356F00E64DD57B08836D0C032C4047A4 119349~|~1~|~1~|~01/NHS~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~3A28B38F7A19A30DA30774C7F23C289CDF4668CA 95510~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 146-17.55 to 25.78~|~05 - 4R Maintenance - Resurfacing~|~BA3BB553161058FCA216FDB8C4325052A40B8B89 95510~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 146-16.21 to 17.55~|~05 - 4R Maintenance - Resurfacing~|~2925C506516ED6EA96A8479631EB0DDD121DBBCF 115843~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2028. Various routes and sections in D10.~|~21 - Safety~|~0985828224825719B06D607DEFD773B947571D4D 112308~|~1~|~1~|~01/STR~|~Resurfacing on Darke County routes: CR9-4.57-9.72 CR76-0.23-5.20~|~05 - 4R Maintenance - Resurfacing~|~F5907E4E217456F988DFCC6AD9EA4D8761A035D1 112308~|~1~|~2~|~02/NFA~|~Resurfacing on Darke County route: DAR-CR-35 5.62-11.09~|~05 - 4R Maintenance - Resurfacing~|~28DEDA4AD70FBF839E786C421765C64D3BFCCA58 108453~|~1~|~1~|~01/MPO~|~Resurfacing of CR 16 from Cuyahoga Falls North Corp Limit to Boston Heights South Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~000FD010C88B08B76983247ECCCC87898203CC00 104081~|~1~|~1~|~01/BRF~|~Bridge Replacement on Buckingham Road.~|~10 - Bridge Replacement~|~C734A7BC1837C2AD57614C0057D75F004C345C2D 83389~|~1~|~1~|~01/NHS~|~Widening of WAS SR 7 to add left turn lanes and reconstruction and relocation of Acme Street to realign the intersection of SR 7 and construct dual SB left turn lanes. Funded 90% Safety 4HJ7/10% State 4BC7 and 80% Federal (WWW-MPO) and 20% Local on NHS.~|~21 - Safety~|~A7E6DF5DC7C41DC9FDDA623A2DAAE53E0ABC1D36 83389~|~1~|~2~|~02/NHS~|~Intersection improvement at Pike (SR 7) and Acme Street in City of Marietta. 100% Local (City) items.~|~21 - Safety~|~FBC103720AED091385D881BAF69AA8B4C86E6597 83111~|~1~|~2~|~02/STR~|~"O2/STR/OT/ " - District Preservation Marking Pavemnent Funding 4MP7(100% State) - No CAP - Marking Pavements on 1) LIC SR37 0-11.73; 2) LIC SR37 16.59-24.97~|~05 - 4R Maintenance - Resurfacing~|~2CD2D23F9C0A46564CC0562110ABC36D5F6851DF 83111~|~1~|~1~|~01/STR~|~"O1/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) LIC SR37 0-11.73; 2) LIC SR37 16.59-24.97~|~05 - 4R Maintenance - Resurfacing~|~89B1E3BB5A6543040DB2AA140F68D1DB1D48669D 83111~|~1~|~3~|~03/STR/JOHN~|~"03/STR/OT/JOHN" - Local funding - 4BG7 (100%) - No CAP - Curb and Gutter work in the Village of Johnstown.~|~05 - 4R Maintenance - Resurfacing~|~FB23911B564519A5980D5C4DA95571DA39F7E712 123557~|~1~|~1~|~01/BRO~|~Rehabilitation of the Fishinger Rd (CR-52) over the Scioto River.~|~13 - Bridge Rehabilitation~|~541AB22F2F855EFB66F7F4419DFCEEE1D8591FF3 101633~|~1~|~1~|~01/IMS~|~Building demo along I-76 and Main/Broadway interchange.~|~44 - Other~|~4BFED06A79598ADDC4DB2BDAAA70834C7A516B75 114435~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~3CD8A0A2A24D33E786536DAEAA53977A177BC7EA 89193~|~1~|~2~|~02/STR~|~D6 $ (4PF7/4PS7) to replace culvert at SLM 4.3702/STR/OT/~|~04 - Reconstruction - No Added Capacity~|~60F510C047B78668E49CB9EF8181380C6B2186AF 89193~|~1~|~1~|~01/SAF~|~Safety $ (4RS7/4BC7) to lower road profile to improve sight distance01/SAF/OT/~|~21 - Safety~|~A392A0F0D1D5ABEAE398CE0692782DC4B5658D0A 80986~|~1~|~1~|~01/ERD~|~80/20 fed/local split for earmark funds.~|~44 - Other~|~F4724E4EAD764B1DBAF47D601CC8B35939F968CA 123015~|~1~|~1~|~01/NFP~|~Fence installation and repair along various routes throughout District 4.~|~21 - Safety~|~BEBE0B7301F7249B702AD7ECA2C49BB4AA86867D 94441~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~35807B252EE55DF85E5D38C37023A8F2031D3E8D 122282~|~1~|~1~|~01/BRO~|~Bridge work. Rural classifications~|~13 - Bridge Rehabilitation~|~D6D33D8BF9018F495CF7648D689926F39A8CB074 122282~|~1~|~2~|~02/S5K~|~Bridge work. Urban SFNs.~|~13 - Bridge Rehabilitation~|~C3DE1AFDF6820543DFC59A802918D7FDC5D26F25 120742~|~1~|~1~|~01/NFP~|~Sanitary Sewer Extension.~|~17 - Construction Engineering~|~6D1D8033B8CB956F8E1B9968F57D11DE31854E16 110646~|~1~|~2~|~02/STR~|~Minor bridge rehab 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~DCE50DFDEEED0F32C3540B5DC7D7FEA1877752CF 110646~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EDA18B55CBC531AA8264C9E393F41CAA2843E4DB 107453~|~1~|~1~|~01/STR~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~184487AB2EC88F367BBFECCA9449C267CC62A9DA 96213~|~1~|~1~|~01/STR~|~All Items of work associated with the replacement of MRW-314-8.08 (SFN 5903033) and MRW-314-20.57 (SFN 5903394)~|~04 - Reconstruction - No Added Capacity~|~0531A8A977436DBF7638E7646AB486FABEBE64A5 111038~|~1~|~1~|~01/STR~|~Bridge replacement JAC-776-6.18~|~10 - Bridge Replacement~|~A8247AF5563D643E2770BD675D6C96647D785DFA 95602~|~1~|~1~|~01/NHS~|~JAC 35 2.74-8.35~|~05 - 4R Maintenance - Resurfacing~|~47420791A38DAAA6F76247395ACE127AA3A09383 93591~|~1~|~2~|~02/NFP/Prbg~|~WOO-20-1.07 to 1.14 WOO-65-8.67 to 19.35 in Perrysburg. This includes pavement repairs, curb, curb ramps, and sidewalks.~|~05 - 4R Maintenance - Resurfacing~|~8ED06D992286CAD142FD2A73ED4CEB3B972D72A3 93591~|~1~|~1~|~01/S>2/Prbg~|~WOO-20-1.07 to 1.14 WOO-65-18.67 to 19.35 in Perrysburg.~|~05 - 4R Maintenance - Resurfacing~|~E01003797AC9E50B06244A000BE6153DA4509061 114346~|~1~|~1~|~01/ENH~|~Paving B&O bike trail Butler to Bellville~|~28 - Facilities for Pedestrians & Bicycles~|~324CD59EF8943E44FEBEAF21525A4F8DD805C5CB 109500~|~1~|~1~|~01/NFP~|~Construction a traffic signal and crosswalk eligible for State-aid~|~21 - Safety~|~001582690C444A02D609B9ADD7A04FD2C2322555 91039~|~1~|~1~|~01/BRO/CUY~|~80/20 funding split for all work using local BR funds.~|~10 - Bridge Replacement~|~CAB02813178D49801D9814553F350ED8EEE1BA36 92894~|~1~|~1~|~01/STR~|~This Plan Split is for road work eligible to use the federal funds from CEAO.~|~04 - Reconstruction - No Added Capacity~|~508854E672DE6F07411A9586F6A22183000D9CD2 113339~|~1~|~1~|~01/SAF~|~R-WR striping on various routes (SUM-76, STA-77, STA-62, SUM-77, SUM-21, SUM-585, TRU-422, & WAY-585).~|~21 - Safety~|~6394B6204E24B7C5606C78BC62DE4514DB9B8AC8 98001~|~1~|~1~|~01/STR~|~Resurfacing along SR 83 and US 22 in Muskingum County. Preventative Maintenace along bridges within project limits.~|~05 - 4R Maintenance - Resurfacing~|~F319232B0C8EEBC3654ACAB9B7DB715946272D82 98001~|~1~|~2~|~02/STR/NWCD~|~Resurfacing with related work along US 22 in the Village of New Concord & along SR 83 in Muskingum County. ~|~05 - 4R Maintenance - Resurfacing~|~2E0525E99AA73B34FDC6501120351C90CF04A7EA 118973~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding~|~21 - Safety~|~A2F0F733CDF0F6D91E85D5A777830B9C339DCE54 120677~|~1~|~1~|~01/S>2~|~Resurfacing work with MPO funding~|~05 - 4R Maintenance - Resurfacing~|~F109E4827A792FF799CB6FD8C3AC63CF54C46F7A 110062~|~2~|~2~|~02/STR~|~Work on FRA-665 from 6.99 to 7.39 - rural section~|~05 - 4R Maintenance - Resurfacing~|~A2341456911F390C1104D75E6EF9D31C06CBC93B 110062~|~2~|~3~|~03/S>2~|~Work on FRA-665 from 7.39 to 8.34 - Columbus Urban Area~|~05 - 4R Maintenance - Resurfacing~|~87BDCFE05B79C7606AC0597463C2B1BE6340BA08 110062~|~2~|~4~|~04/S>2~|~Replacement of FRA-665-7.108, FRA-665-7.257, and FRA-665-8.185 culverts~|~05 - 4R Maintenance - Resurfacing~|~38607BED18D2AD7D495838DEB39FD1A875141662 110062~|~1~|~5~|~05/SAF~|~Items of work associated with R-WR pavement markings~|~21 - Safety~|~4044BF46F7633955872F53A1B0B620DA828C2BF1 110062~|~1~|~1~|~01/NHS~|~NHS Plan Split: PIC-23-0.00-5.78 & 10.32-10.51 (pavement repairs only)~|~05 - 4R Maintenance - Resurfacing~|~E05B83B242B09D54B0DDDE065048FF407F24B365 110062~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~3FFE773179A4AC8CB22DCFD651DFBBB81AB27020 97537~|~1~|~1~|~01/SAF~|~Installation of Preeway Service Patroland Traffic 511 signs in the Cincinnati and Dayton metro areas.~|~21 - Safety~|~6CE1922BFED750203F906D0FFF7C5CA1256DDAF5 88833~|~1~|~1~|~01/NHS~|~01/NHS/PV/ - District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No cap - resurfacing on US30~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A32B4E07AA616AA4E1358E1717D15FE285F06C4E 100985~|~1~|~1~|~01/S<2~|~Emergency A project on JAC 327 10.92 to replace a culvert and repair the roadway due to flood damage.~|~04 - Reconstruction - No Added Capacity~|~AB67B34C80F2962F8C39FB94563D8F8B6AB67912 107201~|~1~|~3~|~03/IMS~|~replace existing bridge width~|~10 - Bridge Replacement~|~CC5A59E37F4A2B3A2D5F0E0B0C1BCE71686244E3 107201~|~1~|~4~|~04/NHS~|~Widening bridges to provide a third lane~|~10 - Bridge Replacement~|~FD67F8C94AC78DB972AC493DA99F0217A09A96DA 107201~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement, SLM 0.00 to 1.41 and 1.78 to 5.29~|~04 - Reconstruction - No Added Capacity~|~C656652291F639BCF383B2AED91434BF1A127060 107201~|~1~|~2~|~02/NHS~|~Widening of pavement to add a third lane, SLM 0.00 to 1.41 and 1.78 to 5.29~|~03 - Reconstruction - Added Capacity~|~05009DE9135C90BCEAB9D9F48C094739B79DAC0B 107201~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~B342E0A4D78B150FB2F95424210B5651E910B272 122806~|~1~|~1~|~01/BRF~|~Bridge replacement ~|~10 - Bridge Replacement~|~E68F52071A1C0D05104351408E34A193B91D2BFF 118420~|~1~|~1~|~01/NHS~|~Pavement removal and replacement. GAL 35 15.96.~|~05 - 4R Maintenance - Resurfacing~|~15DAD7156BEEB1FEB471FA9E10027A7F695528DC 113857~|~1~|~1~|~01/SAF~|~Safety funding plan split~|~21 - Safety~|~2D0911CC87BA9E981380644DB118D75E0181DDF0 113857~|~1~|~2~|~02/NFA~|~Plan Split for 100% locally funded scope items that are not eligible for Safety funding, such as landscaping and streetscape items.~|~31 - Landscaping & Other Scenic Beautification~|~DA362F56A8E04271E0043AA73B8EC5712D1747DE 101982~|~1~|~1~|~01/STR~|~01/STR/PV/TUS - Rural portion of work at 80% federal/20% local.~|~05 - 4R Maintenance - Resurfacing~|~36A51F589B16999C07E8F252D86B3CF435E21DF2 101982~|~1~|~2~|~02/S<2~|~02/S<2/PV/TUS - Urban portion of work at 80% federal/20% local.~|~05 - 4R Maintenance - Resurfacing~|~579CA43FB7889438E0C1A082AFA171A0DC864243 99742~|~1~|~1~|~01/BRF~|~Ohio Bridge Partnership Program. SFN 5234158, State Road~|~10 - Bridge Replacement~|~D7AF9F484F93505FA57D3334267A092501E90564 97852~|~1~|~1~|~01/BRF~|~Replace Beechtree Rd structure over Mason Run (SFN 2567660) in Whitehall~|~10 - Bridge Replacement~|~C6DB9B0305861256903BA8FA3310746B8697F042 97852~|~1~|~3~|~03/BRF~|~Replace MAD-CR 85-0.12 (SFN 4931629) structure over Bradford Creek~|~10 - Bridge Replacement~|~26003C973E362D6F6B7D7CB77077C16665A5DAD1 97852~|~1~|~2~|~02/S>2~|~City waterline relocation along Beechtree Rd~|~43 - Utilities~|~2742EF701CDA3301F8AB7A1ED6A9A4C667DCD5B9 93460~|~1~|~4~|~04/BRO~|~Split for work involving The Illuminating Company~|~13 - Bridge Rehabilitation~|~7A055B4AC57ED57E25BD0F5DF8D0521664064A33 93460~|~1~|~3~|~03/BRO~|~Split for work involving Dominion East Ohio~|~13 - Bridge Rehabilitation~|~968A2287D490EBE71516E462DA71433DB30C1DFB 93460~|~1~|~1~|~01/BRO~|~80% Federal / 20% Local participation using Local Bridge and MPO STP funds for the replacement SFN 1869388.~|~13 - Bridge Rehabilitation~|~CB7F7C1B2012F49B3E12C5BFCBB77C9666E1D070 93460~|~1~|~2~|~02/BRO~|~Split for work relocating AT&T Ohio~|~13 - Bridge Rehabilitation~|~EDB5C6B3B825AF1E7140174B89FC4E01DDBFE50B 102933~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~13 - Bridge Rehabilitation~|~3D5F6D3E7D82C8F553BAAC276775AF26EFE82DBD 95133~|~1~|~1~|~01/STR~|~Culvert Replacements. ATB-SR45-0.56, ATB-SR45-18.62, ATB-SR534-4.02, in the County of Ashtabula, Ohio.~|~44 - Other~|~40516764365B5B4A3445250C4E9FDAA07CEFA867 108775~|~1~|~1~|~01/NFA/CKVL~|~Village of Crooksville Muncipal Bridge Funding - 4R87 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comment - Replacement of bridge (SFN 6433634) carrying Industrial Driver (MR 80) over Moxahala Creek.~|~10 - Bridge Replacement~|~A4976C3EE056406212112A9DBD4ED1E0F8158C17 100051~|~1~|~2~|~02/IMS~|~Districtwide mowing - Preble County in D8.~|~44 - Other~|~07FF40041379BDB106F7EDCF9D0AA72AE38F1E6E 100051~|~1~|~1~|~01/IMS~|~Districtwide mowing - various routes~|~44 - Other~|~E3561E60298B72E909251E1229A5AB8FE4CC8F0A 107846~|~1~|~1~|~01/NHS~|~All work is in this plan split. District preservation funds.~|~04 - Reconstruction - No Added Capacity~|~D0FA6C656771E8871EA74882B4282EEADA44B840 112948~|~1~|~1~|~01/NFA~|~Replace all of the wood sidewalk, cantilever supports, and railing posts and panels.~|~47 - Bridge Preventive Maintenance~|~A2BA31B3869AAAB3F389C361E993FDD7C15CECC4 103722~|~1~|~1~|~01/S<2~|~Pavement marking on various county roads; Urban Federal.~|~21 - Safety~|~AB631969FF8AE42B86B0D5E7B005F00DC7E5BCFC 103722~|~1~|~2~|~02/NFA~|~Pavement marking on various county roads; Urban Non Federal.~|~21 - Safety~|~23C79B51EEAFB5C604D09F54CF355EC8BECE8918 103722~|~1~|~3~|~03/STR~|~Pavement marking on various county roads; Rural Federal.~|~21 - Safety~|~F1030506146AA1D82C43FC9D12AC28DD52C6879B 103722~|~1~|~4~|~04/NFA~|~pavement marking on various county roads; Rural Non Federal.~|~21 - Safety~|~827A4CE6F8B6393EBFF372994F8F2A34E32A0246 111022~|~1~|~1~|~01/SAF~|~Safety funded Plans split~|~21 - Safety~|~DCDECCF85DE4CCEA16F2A9DCF68C58CBF029ECDF 123339~|~1~|~1~|~01/STR~|~Two-lane resurfacing project on WAS CR 42.~|~05 - 4R Maintenance - Resurfacing~|~718653DDDCF3B656B7B1EDA0F1B89DB38D213FB4 101290~|~1~|~2~|~02/STR~|~Resurfacing STP Rural eligible portion (slm 5.09-9.52)~|~05 - 4R Maintenance - Resurfacing~|~E0AC5E841A52EA136A4461A3D0580244C9EB0C72 101290~|~1~|~1~|~01/NHS~|~Pavement repairs on SR 18 from SLM 9.517-10.56 (NHS portion).~|~05 - 4R Maintenance - Resurfacing~|~D83EFA7A1362F34149F31C3AF540617D906F6CF3 114728~|~1~|~1~|~01/NHS~|~Smoothseal on PIK 23.~|~05 - 4R Maintenance - Resurfacing~|~0914BB751820DF819D93DE202837E07E89152126 114728~|~1~|~2~|~02/NHS~|~Bridge PM. ~|~47 - Bridge Preventive Maintenance~|~750E5DF4F049E87DD50782D6CE4E5CBDFD6444C5 109305~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG CR 1 9.04, SFN 5332508.~|~10 - Bridge Replacement~|~73755AB68F6EAEC95F0772B83ADEADDD1245FFBF 125629~|~1~|~1~|~01/STR~|~Pier encasements~|~48 - Bridge Protection~|~FCCB9F9ABBE2742C1415BF46D037678DD7ABD4E3 125629~|~1~|~2~|~02/IMS~|~Pier encasement~|~48 - Bridge Protection~|~6A7C35D7F90628A76938976956ADEDAE6EC16AF0 125629~|~1~|~3~|~03/NHS~|~Pier encasement~|~48 - Bridge Protection~|~3653B1F1C7936B4BFFBD8C8BC0D9756F422A4C23 122438~|~1~|~1~|~01/IMS~|~All items of work associated with the resurfacing of I-71. Includes work on drainage, guardrail and miscellaneous items.~|~04 - Reconstruction - No Added Capacity~|~DF57160FE2A4EA01C15999F51C5E6CEDB90E7802 110831~|~1~|~1~|~01/IMS~|~Split for slide repair work~|~44 - Other~|~047F61966B94A88D8EB27DE0E9681852011A8936 114629~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~6816DD5E17FE661DAA4C6AEF727A78F9F689A956 108895~|~1~|~1~|~01/STR~|~Emergency culvert repair by liner.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C885ECB0414F94BB221966D519ECB32569A8AF66 126359~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~E06DA86E74E1C0F0A70943152E7733FD7B0362D1 117395~|~1~|~1~|~01/NFA/TRCE~|~Bridge replacement, going from one lane to two lanes.~|~10 - Bridge Replacement~|~B9DA6AB3624DE47FEA4E177A34A34467112DD64B 108047~|~1~|~1~|~01/STR~|~Traffic Improvements.~|~21 - Safety~|~BF1640438E234A2444304C973DB3B95AEFEA0632 22598~|~1~|~2~|~02/NHS~|~Bridge demolition and replace with fill. ATH 50 38.11 RT, SFN 0502162. NHS route funded 80 federal/20 state.~|~10 - Bridge Replacement~|~A522558449677EB29C2371A2819C068C5E4D6C64 22598~|~1~|~3~|~03/NHS~|~Preventive maintenance resurfacing using an asphalt inlay treatment on ATH 50 37.18-39.04. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B1EC44611CC8ABFC43D34DA4E75D0C88E4816E31 22598~|~1~|~1~|~01/BRO~|~Bridge demolition and replace with fill. ATH 50 38.11 LT, (SFN 0502138). BR Eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~D02E3AA6D0273E0F04AA727059F394F6BAC2C798 106001~|~1~|~1~|~01/MPO~|~Work eligible for federal-aid~|~21 - Safety~|~6068D9AB8411FC7C36EACEF530D8E6FAF984429B 121074~|~1~|~1~|~01/STR~|~Resurfacing SR 213~|~05 - 4R Maintenance - Resurfacing~|~CF7AE52D74FDBACD006A9F513F3D2FCC2D41E7BB 108068~|~1~|~1~|~01/IMS~|~Spot paving/repair on IR 71 in FRA, DEL, MRW counties and IR 270 in FRA county.~|~05 - 4R Maintenance - Resurfacing~|~180B3ACEF1056E8D8FA8E20ADE213DD33A65003F 127060~|~1~|~1~|~01/STR/NEWL~|~Pedestrian facilities and related work along SR 37 (E. Main St) and Thorn Street in the Village of New Lexington.~|~28 - Facilities for Pedestrians & Bicycles~|~26466380084C127D3020597288EC25714BB15029 116833~|~1~|~1~|~01/ENH/YOUN~|~Road diet, sidewalk and crosswalk enhancements.~|~04 - Reconstruction - No Added Capacity~|~264EB15965D2BC6AB5B13163356463C37BE030C6 124797~|~1~|~1~|~01/ENH~|~Rehabilitation of the Harmar Bridge for shared use path over the Muskingum River to tie east and west side downtown economic areas together.~|~28 - Facilities for Pedestrians & Bicycles~|~3FBB61BE3EA293139D826AD448E1E1CC39A8B98B 117614~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~F056D5B20B44F9943901262F7E11A13A0DAF43AD 118055~|~1~|~1~|~01/NHS~|~Install roundabout and other ramp safety improvements~|~21 - Safety~|~4321FCA5E49F068B4F9A3B2A3334A8558A20F069 99677~|~1~|~1~|~01/NHS~|~Split for resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~1F618C0F1EC49700CBB02F4B20612A339402E549 101116~|~1~|~2~|~02/NHS~|~NHS Non-Interstate bridges to be sealed~|~47 - Bridge Preventive Maintenance~|~6D2671EC42CEBCEA3917D041D2C2369B6A0A1546 101116~|~1~|~1~|~01/IMS~|~Interstate bridge to be sealed plan split~|~47 - Bridge Preventive Maintenance~|~58D616D2DEB7B4EF1BD0B2BCE8DED24538DEF6A7 117299~|~1~|~1~|~01/NFA~|~Created for J&C involement~|~44 - Other~|~04506D48CA3F575450BCBB22928D5C326DDE9ED2 126399~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~63A7762672BD8231E250BF550036BC5633822C55 114464~|~1~|~2~|~02/STR~|~Resurfacing SR 558 from SLM 10.47 to SLM 12.56~|~05 - 4R Maintenance - Resurfacing~|~178FE1BA0179BCB901E65B1055414D7E5592DB74 114464~|~1~|~1~|~01/NFA~|~Resurfacing SR 558 from SLM 0.00 to 10.15~|~05 - 4R Maintenance - Resurfacing~|~EBBCAB98982795C2E3F568B65CAA03F43237E87E 119722~|~1~|~1~|~01/NHS~|~Plan Split for Municipal Bridge funded scope.~|~13 - Bridge Rehabilitation~|~440D348DEA048EF728ADDEC603067DC3D428AFD2 122396~|~1~|~1~|~01/NFA~|~Plan split for resurfacing Mazurik Lake Erie Fishing Access~|~05 - 4R Maintenance - Resurfacing~|~F280F806DFD1395C95A4DD744E8EBA550DAF5BC1 105121~|~1~|~1~|~01/IMS~|~Culvert rehabilitations.~|~04 - Reconstruction - No Added Capacity~|~7C1A548D06830E81CA56D4466D9E4F2B018308C3 112295~|~1~|~1~|~01/STR~|~Intersection improvement project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~04 - Reconstruction - No Added Capacity~|~6C737E8CF74A0F929399491D44FC471E9008F130 109380~|~1~|~1~|~01/NFP~|~ODNR Culvert project in Tar Hollow State Park.~|~99 - State Preventative Maintenance~|~B7F8190E5C225149A4802EB287D27613727D98EF 96335~|~1~|~1~|~01/NHS~|~Addition of a bikeway within existing curb lines (re-striping) on Central Parkway between Elm Street in the OTR neighborhood of Cincinnati and Marshall Avenue in the CUF neighborhood of Cincinnati.~|~28 - Facilities for Pedestrians & Bicycles~|~57DC7E38D0B9F095BA6D9E0AECF7D830EE6F2B3F 117317~|~1~|~1~|~01/NHS~|~Safety work~|~21 - Safety~|~877B255194B9309A039A947A5FED04630CCAC1A5 95691~|~1~|~1~|~01/S>2~|~Napoleon Rd~|~05 - 4R Maintenance - Resurfacing~|~D7CE6524DBE0B192B3A5F344D0A0AE7DCC53B0A3 110669~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~68B5DE45B258AC6983C32E485365CE5BD3C4593F 110669~|~1~|~2~|~02/S>2/TWIN~|~Resurfacing, urban paving in the city of Twinsburg.~|~05 - 4R Maintenance - Resurfacing~|~1E3266D259F43B0F80BAC8A5C63C1A852FA52418 110669~|~1~|~3~|~03/S>2/TWIN~|~ADA curb ramps in the City of Twinsburg.~|~04 - Reconstruction - No Added Capacity~|~76FB12A7F4D41596E717FB0B419AC93D0B621504 110669~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~63F0B5415A9D9FCE9B86B7260BAA9F8AB94EBCD8 110669~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~43024D431604EE8C010ED357433AEB0923D6A89A 109370~|~1~|~1~|~01/NFP~|~The City will improve and extend 3,500 feet of East Commerce Drive starting at Carpenter Road and ending at the Genesee Wyoming railroad tracks.~|~04 - Reconstruction - No Added Capacity~|~F2363FB9F38E2078533E47F7F8B00219F07C1688 101438~|~1~|~1~|~01/STR~|~ASD-39-0.00 to 8.09ASD-89-15.57 to 18.42ASD-60-1.47 to 4.11~|~05 - 4R Maintenance - Resurfacing~|~AD6FC691CDDF91AE9E0B94625C91B2BD74C2B7D5 123703~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 681 21.18-.28.94.~|~05 - 4R Maintenance - Resurfacing~|~611A53CBAEE85355C9DBE736540C0F36387FA5B0 116606~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and associated resurfacing work on FRA-270.~|~05 - 4R Maintenance - Resurfacing~|~91D3442C2D1A7C5F9F4777D542EDA5DFE209866E 96331~|~1~|~1~|~01/MPO~|~Resurface Columbus Avenue from Bogart Road to Perkins Avenue.~|~05 - 4R Maintenance - Resurfacing~|~FAD8CBC72FCCE7A76546269FFA80F275A3C8B7EB 96331~|~1~|~2~|~02/MPO~|~100% Local Items~|~05 - 4R Maintenance - Resurfacing~|~F4D29D80B2F4C73A514C42571D3FBE35E753DE23 119357~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~32B16DCBBEEF662D04074E9D0175CD5ACC28C5DA 124030~|~1~|~1~|~01/IMS~|~New Ramp Construction~|~03 - Reconstruction - Added Capacity~|~6E6C23797E3C7C612D98A086E707608792D39CF5 84463~|~1~|~1~|~01/BRF~|~Messick South Rd SFN 7843852 TR 235 over baughman creek~|~10 - Bridge Replacement~|~1B0644092BBA6C326BC874A6ACF072E672566F5E 125570~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~3B92061FAC50034F5E3A09DD3638EADBF246F95F 121096~|~1~|~1~|~01/NFA~|~Plan Split ~|~17 - Construction Engineering~|~E613476B1B606E236A5C7CC75298951C5707CB63 101462~|~1~|~1~|~01/S<2~|~City of Hillsboro CR 1159~|~04 - Reconstruction - No Added Capacity~|~68C6C3B168D0415394DA36FD628A92E38CC86C0B 93669~|~1~|~1~|~01/SAE~|~Construction of sidewalks along SR170, between Dobbins Road and Nesbit Drive, in the Village of Poland.~|~28 - Facilities for Pedestrians & Bicycles~|~B7583ADE1CE7F919047C7ED30DDA27BF26AC4F8A 104822~|~1~|~1~|~01/MPO~|~See linked structure.~|~10 - Bridge Replacement~|~BE4FC61FAB461B40CEEB9FC0196FC6E4AE35557A 105404~|~1~|~1~|~01/NHS~|~Bridge painting on NHS bridges.~|~13 - Bridge Rehabilitation~|~13765408D87FF1A41C33281A77407912C3FF8EAE 85159~|~1~|~1~|~01/BRO~|~Plan Split for SFN 7740018 SUM Ravenna Road Bridge over Tinkers Creek.~|~10 - Bridge Replacement~|~6C775A7684690B59064BF23143BBEC5F1C3F83BD 124628~|~1~|~1~|~01/NHS~|~All work associated with the rehab or replacement of GRE-444-0016~|~10 - Bridge Replacement~|~933B65707958EDDE1FAB0E2C91604E72247B8942 92975~|~1~|~1~|~01/STR~|~Rural two-lane resurfacing project. Work includes berm and striping. WAS CR 11 0.00-7.50. Federal 80% and Local 20%.~|~05 - 4R Maintenance - Resurfacing~|~E63D022003DDC1EBF43475EF5BC11694F43114FB 111567~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~8EB6E6033DDBAF2E88ADD80057F01D0D870A6D3C 95268~|~1~|~1~|~01/NHS~|~Bridge over CSX RR in the City of Tiffin, SFN 7401892~|~13 - Bridge Rehabilitation~|~1C81E8929B4D270F6F7CAB881AC71AE0DB732202 115562~|~1~|~2~|~02/NFP~|~Work funded 100% by the City of Lima.~|~44 - Other~|~CE22D44C028533C7EBB25EEC81F459A0EC4D32B2 115562~|~1~|~1~|~01/S50~|~Resurfacing - 80% federal funds from the District Preservation Program budget with a 20% match provided by the City of Lima. ~|~05 - 4R Maintenance - Resurfacing~|~8A1A4D6D6B1DE175FFE98178894C8899341D83FA 116148~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - ~|~05 - 4R Maintenance - Resurfacing~|~41FCD8032A752741CAB64C8988976F31BF6DADBC 116148~|~1~|~3~|~03/NFA~|~Plan Split 03/NFA/PV/ - ~|~05 - 4R Maintenance - Resurfacing~|~82C83AB1D076B89164D61B93C00CBB8F9CDADB53 116148~|~1~|~2~|~02/S5K~|~Plan Split 02/S<2/PV/ - ~|~05 - 4R Maintenance - Resurfacing~|~06CB0EC7DF442814FDFC40A7C1A56EA7DFBC657C 97763~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7 (100% State) - No CAP ? Full depth pavement repairs with related work on: 1) GUE-SR 662-0.00 ? 7.27; 2) COS-206-5.98-6.63; 3) COS-662-0.00 - 0.42; 4) COS-SR 715-0.00 ? 8.14; 5) MUS-SR 662-0.00 ? 0.45~|~05 - 4R Maintenance - Resurfacing~|~19D7376E24C2F1FC77EE5CDB287511AE0CC590A6 97763~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Full depth pavement repairs with related work on: 1) Fai-US 33-17.53-17.57; 2) Fai-US 33-19.05-19.07; 3) MUS-SR 16-7.68-7.70; 4) LIC-SR 13-22.55-23.55~|~05 - 4R Maintenance - Resurfacing~|~3FEB72ECE806F10F647270F85CD3FDFC04C7D66A 97763~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Full depth pavement repairs with related work on: 1) COS-60-(7.58 - 7.71); Kno-SR 229-(19.27-25.38); 2) Cos-SR 229-(00.00 to 00.70); 3)GUE-285-(4.00 to 8.00); 4) COS-541-(8.00 - 10.00); 5) FAI-204-(4.37 - 9.56); 6) LIC-310-(10.50 - 13.45)~|~05 - 4R Maintenance - Resurfacing~|~5908DD78CAF244BFFAF934C807827859F09A9A94 97763~|~1~|~4~|~04/S>2~|~"04/S>2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Full depth repairs with related work on: 1) Fai-SR 204-0.36-4.37;~|~05 - 4R Maintenance - Resurfacing~|~B68527D51B580C8400F82AE1429B7B3305CA9BB4 97894~|~1~|~1~|~01/S<2~|~MIA SR 202 0.52 repair culvert on the est side of the 72" x 44" eliptical CMP (stone arch under roadway) structure. Road closed for construction.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8577F1A749B7E3690CF73986FA44F1965AB2D768 101186~|~1~|~1~|~01/STR~|~CO CO Contr 01 Pavement plan split added~|~05 - 4R Maintenance - Resurfacing~|~4311C60DA4D473266288775CA16550CEC7073BC1 123575~|~1~|~1~|~01/IMS~|~resurfacing a section of HAM-71~|~05 - 4R Maintenance - Resurfacing~|~F4DCECB2A67630993C04DB33408363FBE5D7BBB5 123238~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0D97B6ADD6A206E47A132F8E76E12CA500CB7221 96095~|~1~|~1~|~01/BRO~|~BR eligible for rehab (new deck)UNI-33-14.84 (8001294) Scottslawn over US33~|~13 - Bridge Rehabilitation~|~8217BE301A1DCBA338D63ED6A0FBF529C7FCFC2E 96095~|~1~|~2~|~02/BRO~|~BR eligible for rehab (deck) UNI-33-21.02 (8001448) Brock Rd over US33~|~13 - Bridge Rehabilitation~|~FF30B93CBF60A50EA19AE6AF2A9EB6270E84578B 96095~|~1~|~3~|~03/NHS~|~Non-BR eligible - deck overlay - NHS routeUNI-42-4.58 (8002371) US42 over US33~|~13 - Bridge Rehabilitation~|~95C74B67FAF6C769F974B99555BFBAC47DB7CBC9 96095~|~2~|~4~|~04/BRO~|~This split pays for UNI-33-0879A overlay replacement only, must be at 100% state because it is repair of work done in last 10 years.~|~13 - Bridge Rehabilitation~|~9C0EF75E837AE823E2529596A7ED6E9BA0C72117 96095~|~1~|~5~|~05/NFP~|~Repair damage to structure UNI-33-17.98 (Beecher Gamble Rd over US 33), SFN 8001383~|~13 - Bridge Rehabilitation~|~F734676FB310BC9278CC86B2B855C9382ED8A005 114185~|~1~|~1~|~01/NFP~|~Replace culvert.~|~~|~3A03EC9792698AD7C8077E5794752EED3C9C6A53 108898~|~1~|~1~|~01/NFP~|~The CITY will improve approximately 1,700? of Disher Drive in the City?s industrial park~|~44 - Other~|~2D580305316230854409E95126AA8BDF3B7E2D0F 93809~|~1~|~1~|~01/MPO~|~Resurfacing of Franklin Avenue (CR-501) from Cherry Street to Summit Street in the City of Kent.~|~05 - 4R Maintenance - Resurfacing~|~EF09D4010C52ABEC690DD260D83825CDD62BA44A 124584~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of federally eligible bridges on interstate system~|~13 - Bridge Rehabilitation~|~B28AD187C3EEA961212B4D413A58B984AE44104B 124215~|~1~|~1~|~01/SAF~|~Safety items~|~28 - Facilities for Pedestrians & Bicycles~|~721D755875C272A2910562F53B0DD3D61E764DDF 79668~|~1~|~1~|~01/IMS~|~Priority system resurfacing from iller Ave to FAI County~|~05 - 4R Maintenance - Resurfacing~|~777274774789451D93332A70C107690C14C940B0 79668~|~1~|~2~|~02/IMS~|~Repair, patching & sealing on 15 structures (not BR eligible):~|~13 - Bridge Rehabilitation~|~B72CC768C0F269D4A5DDCD5431431951ED6AB5EA 88665~|~1~|~1~|~01/SAF~|~Reconfigure the southern portion of the IR-90 and Columbia Road interchange as a diamond.~|~21 - Safety~|~03340F93F452EA98C194AE4F39CC29D44DFC684C 123535~|~1~|~1~|~01/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~A4112F238A8F665CE3122231AC39C58D66B7EC63 93290~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Removal of SFN 4505379 (LIC-SR 158-1.64) carrying Loop Road over SR 158~|~40 - Special Bridge~|~3A24E82EFCB45C28FC95238837F4DA02CA17B28C 93290~|~1~|~2~|~02/NFA~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Relocation of Loop Rd (LIC-MR 297) to an at grade intersection with SR 158 and grading work along SR 158~|~04 - Reconstruction - No Added Capacity~|~A581A67B03AE96513ACE7D46216F80A438AF2E3A 102142~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 1.56-3.68. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~EA117BA0716330B39F235BF55D6D33F98616D7CE 102142~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 0.60-1.56. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F66AD908E56A508BA0F092A9F031D8A391B615CC 116260~|~1~|~1~|~01/NHS~|~Bridge split~|~13 - Bridge Rehabilitation~|~CD14A0BEF430912AD8FABAECAD8B9FECBF2F4A54 116260~|~1~|~2~|~02/NHS~|~Bridge split~|~13 - Bridge Rehabilitation~|~E18B20C0D2D82A6E60722169CD8C0F24A2E2A328 97976~|~1~|~1~|~01/STR~|~D09 PM 2 Lane FY20~|~05 - 4R Maintenance - Resurfacing~|~38B61FC35F50B38CD3079A6CB644467C68B13F92 112894~|~1~|~1~|~01/MPO~|~Construction of a shared use path from Blair Court near I-71, eastward along former rail corridor, to the intersection of Dana Avenue and Woodburn Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~60196A25341F8089D6DA9064A55367579E22968D 112808~|~1~|~1~|~01/NHS~|~Resurfacing of POR SR 43 from 7.51 to 9.89.~|~~|~4B0E3E4B3D62A4D03C147F2C1C6FFF9BABD51B93 112808~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~~|~D6000A2E4F163AB58A5E01FDB0E7E3A3F7870FD1 112808~|~1~|~3~|~03/NHS~|~Minor bridge work > 10' to 20' span.~|~~|~012EA7D008FDA516C0CEC365916623BF4A7F8014 96337~|~1~|~1~|~01/ENH~|~Construction of a multi-use trail and supporting retaining wall in the Smale Riverfront Park (south of the reloated Mehring Way) between Elm Street and the Roebling suspension bridge. Trail will connect to the Ohio River Trail system currently being developed by Hamilton County and the City of Cincinnati.~|~28 - Facilities for Pedestrians & Bicycles~|~F1F26FF5A095AEFF4D6D5A2491295591909A5209 99811~|~1~|~1~|~01/STR~|~Plan split to cover resurfacing and shoulder widening of Old 3C.~|~05 - 4R Maintenance - Resurfacing~|~F91927DF93E6CBF82EAF60E75B6B9136E58EB0BF 92227~|~1~|~1~|~01/BRO~|~6201628 OTT SR163 25.11 Intersect: Portage River~|~13 - Bridge Rehabilitation~|~AF273750C0EDAABBA1E52C4397A2D1866736C057 79750~|~1~|~1~|~01/NHS~|~Resurfacing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~08148FDBF3C3AA804C4E6DDFD4BB0578DD55A90F 112796~|~1~|~1~|~01/S<2~|~Washington Court House Plan Split: FAY-62-14.60-15.49~|~05 - 4R Maintenance - Resurfacing~|~988D779C93DF9357224E4047B7809BDB01DB1FB4 112796~|~1~|~2~|~02/STR~|~Rural Plan Split: FAY-62-15.49-26.74~|~05 - 4R Maintenance - Resurfacing~|~94E6A5836F3DCF69788F2BA472B28530E52F0DE5 112796~|~1~|~3~|~03/S<2~|~Plan split for resurfacing of FAY-22 in WCH.~|~05 - 4R Maintenance - Resurfacing~|~46589834BECDC4BEB5A2D6CAC3AD91889697B970 110165~|~1~|~1~|~01/STR~|~Rebuild the traffic signal and widen the radii to allow for trucks turning.~|~04 - Reconstruction - No Added Capacity~|~ADDCA83209B4AD8E66DDF5B8CD70176BD9EA7158 110165~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~571587DE458A3651917432A2E5CA7FA971C0CAC8 104147~|~1~|~1~|~01/NFP~|~Guardrail~|~44 - Other~|~DEF05EA39B359F9A5F9BAC6D2C1BCAEBD4BE4DA8 121198~|~1~|~1~|~01/NHS~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~CC8BC83501A7FC6313BE5BDE21E42D7B65E10E1A 126343~|~1~|~1~|~01/ENH/AKRO~|~Construct multiuse trail.~|~28 - Facilities for Pedestrians & Bicycles~|~A6FA7C146CF9793D588DA45B2A5BE39BD5187A27 113373~|~1~|~1~|~01/NHS~|~Reduce crash frequency, improve driver visibility of traffic control devices. Improvements include replacement/relocation with mast arm poles for signal support and sign supports, advanced and improved detection, back plates, pedestrian access changes~|~21 - Safety~|~463BDCB740136C0C004B52278893F30EC19ACD42 99638~|~1~|~1~|~01/BRO~|~Replace existing box culvert structure TUS-212-1080 (SFN 7904363) with new four-sided precast box culvert structure.~|~04 - Reconstruction - No Added Capacity~|~9735BB55422F6375C64A7F695C35153FFECB9351 102208~|~1~|~1~|~01/NFA~|~LAW CR 6 7.45 ER Slide Repair~|~44 - Other~|~9E02B317A6290BA68F8F7C3ACFAD25371A72C7E5 97847~|~1~|~1~|~01/BRO~|~OBPP replacement of SFN 4130421~|~10 - Bridge Replacement~|~F8243C09DC74D827321A7E1C87E866D10543CD76 113521~|~1~|~1~|~01/NHS~|~01/NHS/OT/ - 80% Federal (4SF7) and 20% State (4SS7) - slide repair using soldier piling with lagging wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2630B66A0C6455A9E67D0895DA25C4B4E8B4B6FC 101002~|~1~|~1~|~01/S<2~|~Plan Split "01/S<2/PV/ " for Fai-159-(0.00-10.57) and Gue-265-(4.59-11.30)~|~~|~E1B364C649E3F803B9D07EF4434CA9B40C29783B 112649~|~1~|~1~|~01/SAF~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11. Add new light poles, luminaires, and wiring along SR 7/US 22 overlap. Add new lighting at the US 250/SR 151 Park-N-Ride in Harrison County. Also, conversion of HPS to LED luminaires for Belmont, Columbiana, Jefferson, & Tuscarawas Counties.~|~21 - Safety~|~BE5E4BCEA680223DA616329916A081C105A1FF22 110047~|~1~|~1~|~01/NHS~|~Construction change orders~|~17 - Construction Engineering~|~49DE2CF23FAF71EC7F4D842F5CE9775C4F7D6D66 120015~|~1~|~1~|~01/SAF~|~Bike & Pedestrian project. ~|~28 - Facilities for Pedestrians & Bicycles~|~EB7E767DAAFD112754CB53228466046E494DEC0B 122003~|~1~|~1~|~01/STR~|~Intersection improvement~|~21 - Safety~|~D841FEDEB19913D2EE5A1A234250D879EE22501E 102158~|~1~|~2~|~02/STR~|~LAW 141 0.91-8.43~|~05 - 4R Maintenance - Resurfacing~|~D5CC3433CE387FCD1F949AEC44A0735F42F08836 102158~|~1~|~1~|~01/S<2~|~LAW 141 0.00-0.91~|~05 - 4R Maintenance - Resurfacing~|~717264CB849AFD6C4959E2949DD616721D2872AC 102158~|~1~|~3~|~03/STR~|~LAW 141 8.36 (SFN 4402324)~|~47 - Bridge Preventive Maintenance~|~D144FD4DA6A7F715C34EA275322695E659CE7FEC 108662~|~1~|~1~|~01/SAF~|~THE IMPROVEMENTS ALONG THE ROUTE WILL GREATLY REDUCE THE NUMBER OF CRASHES DUE TO THE NARROW CORRIDOR WITH LESS THAN OPTIMAL PARKING DEPTH. THE STREET WILL BE WIDENED, SIGNALS BE REPLACED, PARKING BE MODIFIED, AND LANES BE REDUCED IN PART OF THE CORRIDOR FROM 4 TO 3 LANES~|~21 - Safety~|~B5F3698CADFD712B58ABD74DE19C5017F8FEC1AC 108662~|~1~|~2~|~02/S>2~|~overlay work on MIA-41 SLM 9.49 to 10.31 covered under UPP funds.~|~05 - 4R Maintenance - Resurfacing~|~5FBA970C4E32CA0A79FB36534A4008C3F2972536 85252~|~1~|~1~|~01/NHS~|~resurface LUC US 20A 2.23-3.97; NHS section - SR 295 to Air Cargo Road~|~05 - 4R Maintenance - Resurfacing~|~4F462BDD99CF467596BAE11E56F1A50C82EEF9B1 85252~|~1~|~4~|~04/S>2~|~plan split for 100% local items in Maumee~|~05 - 4R Maintenance - Resurfacing~|~51F58209BACE77F612757D454718C402C248FD74 85252~|~1~|~2~|~02/S>2~|~resurface LUC 20A 3.97-10.54; Fed/State - Air Cargo Rd to Maumee Corp Line~|~05 - 4R Maintenance - Resurfacing~|~C5F1DDAFDE87B4F9C65477B05D66076F4E1AB821 85252~|~1~|~3~|~03/S>2~|~resurface LUC 20A 10.54-11.45; Fed/Local - Maumee Corp line to Ford St in Maumee~|~05 - 4R Maintenance - Resurfacing~|~CE00124E06A984934E6AF7DAF2972723DB6E501D 111412~|~1~|~1~|~01/ENH~|~Construct sidewalks on Duquesne St. at 95% Federal/5% Local (95% 4B37/5% LNTP)~|~28 - Facilities for Pedestrians & Bicycles~|~CBD6D038091E40F0260D48A5DA3F1F3718DB4B3B 113243~|~1~|~1~|~01/IMS~|~Repair/stabilization of embankment along IR 70~|~66 - Resilience Improvement - Highway Project ~|~32246115043EABA3B334375302BFFECDD1791765 113707~|~1~|~1~|~01/NHS~|~Rebuild the traffic signal at SR-125 & Britton Blvd.~|~21 - Safety~|~495785687074B6929BFA2E91F49493FC075EF575 116086~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV/ - 90% 4PF7/ 10% 4PS7~|~05 - 4R Maintenance - Resurfacing~|~12D1170124C35F70643565F03E8B2ED21C6947C5 108473~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 81 1.55-1.59. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~39AB302E398E5F4E6180E7B1380EE8F3EB2FF7D1 119823~|~1~|~1~|~01/BRF/HUDS~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~FEAFD9270AE675084317780DCCE917B98ECE59FA 126061~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~8646780CDEF6842AF351B0DE9DB8E34CFCF8953C 120414~|~1~|~1~|~01/IMS~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~E96FD1F4581A3242B4E28BDE45711988F36EE5D2 123220~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~A6D4C986C008FAC27C362FF78A29333B59C90C84 114117~|~1~|~1~|~01/NFA~|~Paving culvert inverts. NOB 146 7.15 (CFN 1839212) and NOB 513 6.78 (CFN 1852401).~|~04 - Reconstruction - No Added Capacity~|~EA57584EB769C69781DDA4FDE837A835FD17B95F 114117~|~1~|~2~|~02/STR~|~Paving culvert inverts. WAS 550 15.49 (CFN 1885156).~|~04 - Reconstruction - No Added Capacity~|~6F963E0FE6F3E8E4894ADA95D8273408E7C847DF 106507~|~1~|~1~|~01/NFA~|~The widening of Kill road from the existing 17' road to 24' road to help accommodate semi truck traffic.~|~01 - New Construction~|~CC50E8441F14E0A5F4C9CB4641A8D68110A7B659 118810~|~1~|~1~|~01/STR~|~Reconstruction of Lincoln Highway.~|~~|~EDC871910BDE35E263E120CE5DCA991AF8F59A55 117355~|~1~|~1~|~01/NFA~|~Bridge Replacement~|~10 - Bridge Replacement~|~A52A2CC12007E4BEC918CE5146FDBCE770B4E546 124854~|~1~|~1~|~01/STR~|~Culvert replacement STP Rural~|~44 - Other~|~08586CCB05B9C3F27F47386D853556E2467163AC 124854~|~1~|~2~|~02/NFP~|~Culvert replacement nonfederal aid~|~44 - Other~|~BC649C8C5218FAB2EF74F0FE523BD0C5BA8B8E7D 98310~|~1~|~1~|~01/STR~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 80 federal/20 state.~|~21 - Safety~|~406EEB51F87390452F0C6EF77DC0E43A3DEC260D 98310~|~1~|~2~|~02/NHS~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 80 federal/20 state.~|~21 - Safety~|~BAAE5F83D546215E2A00897CFA982F7A338A9E6D 98310~|~1~|~3~|~03/S<2~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 80 federal/20 state.~|~21 - Safety~|~F0E635828F57D1E1B5B19F710FDD91C28034A5D9 98310~|~1~|~4~|~04/NFA~|~Flat Sheet sign replacement project in FY2020. Routes and sections in ATH and VIN counties. Funded 100 state.~|~21 - Safety~|~30B07BEE9CF620FD82CC45ECF5F4E745C0FAFEEC 96955~|~1~|~1~|~01/NHS/ADA~|~It is proposed to Replace Superstructure, and keep existing substructure on US 52, 0.04 miles from Rome Corp limit in Adams Co.~|~10 - Bridge Replacement~|~6FADC3C8989062E9534628AA2A40EE82A35E6340 101311~|~1~|~1~|~01/NFP~|~Work to replace the bridge. 95% state funds SAC 4C87. Part of the Federal/State Exchange Program. The match is provided by the Hancock County Engineer.~|~10 - Bridge Replacement~|~0487864313423C03DD456AFB232586CD38692ED0 119781~|~1~|~1~|~01/STR~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~00CF9DB18DF1BFB471DE7EDBB12C67C7516C2C7C 110845~|~1~|~1~|~01/NFA~|~Replacement of the structure > 20' span.~|~10 - Bridge Replacement~|~AD96A3503CFD2C330BCCCD9F59B40D719183E644 106342~|~1~|~1~|~01/NFA~|~Construct sidewalk between school and southern sub-divisions; improve crosswalk safety and signage.~|~28 - Facilities for Pedestrians & Bicycles~|~4FC9355B682807FBE8A5C5E57F58847B143AC257 106342~|~1~|~3~|~03/SAF~|~Curb bump-out~|~21 - Safety~|~C103CDFDE7BAA5BC04080983476FF6516F370E98 106342~|~1~|~2~|~02/NFA~|~Pedestrian Accommodations at Location 3, SR 113 and SR 601.~|~21 - Safety~|~CFEDA95728E672B648C84C5F2D8922DFAF7E4DDA 121680~|~1~|~1~|~01/ENH~|~Sidewalk improvements in the Village of Wintersville utilizing BHJ TAP (4TC7) Federal funds at 80/20 up to the project CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~DE19B5E7491151D8430FC511EBC0790D009C899F 101931~|~1~|~1~|~01/BRF~|~Bridge replacement on Cummings Road.~|~~|~E8F52556DFCAC430AEF16AE5C172079A6A5278EB 76257~|~4~|~4~|~04/NFA~|~Utility work including new storm sewer trunk line and junction chambers outside the State LA Right-of-way.~|~43 - Utilities~|~32F231C03F39E2300DD0823E97E2611D7A617515 76257~|~1~|~1~|~01/IMS~|~Major rehabilitation of pavement, bridge work, and other work determined by the study phase.~|~04 - Reconstruction - No Added Capacity~|~548D1DC1175F01A7449FC3B1BF9C5ACF2E0A3AF1 76257~|~3~|~3~|~03/NFA~|~Alternate lighting bid items selected by the City.~|~~|~CF08E07928661E1FF593D747C4708A2291AE6600 76257~|~2~|~2~|~02/NHS~|~Major rehabilitation of pavement, bridge work, and other work determined by the study phase.~|~03 - Reconstruction - Added Capacity~|~D645B886E2BE8D1A5AB23020E42E2CA0F216403F 119302~|~1~|~1~|~01/SAE/GCEO~|~Application of new pavement markings on various county routes in Greene County.~|~21 - Safety~|~246B8A6D34637D87ABAA73D68AC1421C0EE0D540 112329~|~1~|~1~|~01/SAF~|~SCI-73-21.00 to 21.85 (Coles Park)~|~21 - Safety~|~69E83CF756938F811DD49012699FA78AB9067644 112329~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~F65EB86DB4E00BFEBF392974EB2331D7212B6019 121627~|~1~|~1~|~01/S>2~|~Reconstruct roadway & improve ped/bike facilities~|~04 - Reconstruction - No Added Capacity~|~2214BE6C10EAADC816F9D917EEA8EE4A97B4D627 97272~|~1~|~1~|~01/STR~|~District wide herbicidal spray project.~|~44 - Other~|~E8C184B76946FEFFBD0F50A9E38941870A57A68E 94182~|~1~|~1~|~01/STR~|~perform minor spray liner work to bridge culverts.~|~13 - Bridge Rehabilitation~|~1C4846C3A92F5F27F451A41A3C563D47CC08410F 94182~|~1~|~2~|~02/NHS~|~Rehab of structure CLE-125-1012~|~13 - Bridge Rehabilitation~|~4B0AA7BEDC07B7E7654D21DBE1B6DE001D4FC5E0 114511~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~711AF509ACFBA8D958B46CABCC48524789D711AA 104149~|~1~|~1~|~01/NFP~|~Guardrail~|~44 - Other~|~45A5B79A712BCA298202B7915AA138498BE4B15A 120878~|~1~|~1~|~01/MPO/FAIR~|~OKI Transportation Alternative funded construction of a portion of the Great Miami River Trail. 50% local match required.~|~28 - Facilities for Pedestrians & Bicycles~|~6349F5484E6E15BBB22C7E565EF101EC9C7613A5 123447~|~1~|~1~|~01/NFP~|~added split for deck sealing project FY30.~|~47 - Bridge Preventive Maintenance~|~380D00C62B66B2B8DFD833BDFDD88062C8D1D241 118187~|~1~|~1~|~01/IMS~|~All items of work for structures that are located on or above an interstate.~|~47 - Bridge Preventive Maintenance~|~FE7D4BF30642D824D7788022DA2C282C6BE98F48 118187~|~1~|~2~|~02/NHS~|~All items of work associated with the structures located on US 35.~|~47 - Bridge Preventive Maintenance~|~151F0DACBBA2D46FAE2A687857F22698F59C6583 123707~|~1~|~1~|~01/NFP~|~Plan split for resurfacing parkways and parking lots in Big Creek Reservation eligible for State Metropark funds.~|~05 - 4R Maintenance - Resurfacing~|~DF0DAB54F95496B7D48B3634E3F5EBBF64E03C6E 123707~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% Local cost.~|~05 - 4R Maintenance - Resurfacing~|~EBD56A449DCE78B7689A0B1E61A50D23460C7D79 97850~|~1~|~3~|~03/BRF~|~Replace MRW-TR152-0.32 (Coleman Rd) structure over Whetstone Creek SFN 5930367 0.7 mi SE of Beatty Rd (CR 149)~|~10 - Bridge Replacement~|~7F4C1F92F2C88418F988248F2889620D1DC9591A 97850~|~1~|~2~|~02/BRF~|~Replace MRW-TR 129-0.14 (Bennett Rd) structure over Whetstone Creek SFN 5931614. 0.2 mi E of Olds Rd (TR 128)~|~10 - Bridge Replacement~|~6716E594A544687F2C65919924F2B50CEAAAC3F9 97850~|~1~|~1~|~01/BRO~|~Replace MAR-CR 138 C -1.64 (Barks Rd East) structure over Qu Qua Ditch SFN 5132347. 0.3 mi E of SR 423~|~10 - Bridge Replacement~|~9AFC5D0F57417CC2BA893F75A017588DBF3C7303 122223~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-80-F~|~~|~FC23ADC52A83D898625F8C8383B7A017E2467AEB 94601~|~1~|~1~|~01/NFP~|~Auxilary pavement markings in Ashtabula, Mahoning, and Trumbull Counties, Ohio.~|~21 - Safety~|~7BC511EA5DDC8FFF97172A8A5C4E782A1439F5F5 102049~|~1~|~1~|~01/NFA~|~The Port is assisting the city of Zanesville and Genesis Healh Care's new facility to construct a new road that will support a second entrance.~|~01 - New Construction~|~5DA876292D2CEC5D79570F2938D58CDAAD8B638C 101700~|~1~|~1~|~01/NHS~|~NHS 80/20 District Allocation/City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~ECB3CF79854C295DF9C1BF9DB39F14E5E0441B68 101700~|~1~|~2~|~02/NHS~|~NHS 100% City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~CF663170EE4A3C0FB7796CF980F075BDD0436DF3 101700~|~1~|~3~|~03/NHS~|~NHS Bridge~|~13 - Bridge Rehabilitation~|~1719BCC55EE7E421EAABC29A000B835A80DCFCEE 108102~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS route bridges.~|~13 - Bridge Rehabilitation~|~39D712734F9C86754638BF056440D59960C5E27F 108102~|~2~|~2~|~02/NHS~|~AC Overlay with Repairs on Us 35 SLM 2608 to 18.59~|~05 - 4R Maintenance - Resurfacing~|~DBBA9DB2D0AC94A959A9D415388BCACEA0534C99 108102~|~1~|~3~|~03/NHS~|~Funds to replace a maintenance of traffic item damaged during construction~|~13 - Bridge Rehabilitation~|~0E81AE670FA36DCBB03630913FF5ADE4E837E41E 89361~|~1~|~1~|~01/NFA~|~Bicycle path construction~|~28 - Facilities for Pedestrians & Bicycles~|~CD893A982907CB23436FE5CE11DEC60417824CBF 117409~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing Countyline Rd.~|~05 - 4R Maintenance - Resurfacing~|~27B2C9CFD0AA61C8E8CEF6C544CF54B5DC8A61D1 117409~|~2~|~2~|~02/MPO/TRCE~|~Resurfacing W Webb Rd.~|~05 - 4R Maintenance - Resurfacing~|~14F8A42D5FBC25B84F3A595EFC07C8151921F643 97385~|~1~|~1~|~01/S<2/FIND~|~For all work in this project.~|~05 - 4R Maintenance - Resurfacing~|~7CBEE569301D425806F4534EA081A767715F5118 106623~|~1~|~1~|~01/SAF~|~Micromilling IR 75 NB lanes at spot location with wet crash trends.~|~~|~8DD1B096125B6200C6EC6BA50CFEB55DE8A003FE 121881~|~1~|~1~|~01/S5K~|~Chip Seal on ATH CR 29 0.00-0.385.~|~05 - 4R Maintenance - Resurfacing~|~BA03FE46E63455DB42BB2F33292A75B4D94AC1CC 121881~|~1~|~2~|~02/NFA~|~Chip Seal on ATH CR 29 0.385-4.154.~|~05 - 4R Maintenance - Resurfacing~|~FA15C8378CE867E971C0BE5DD761388B6B71DB0C 101398~|~1~|~1~|~01/BRO~|~Bridge.~|~13 - Bridge Rehabilitation~|~6E6DC714817E59B55AEB60E748851CBABDDE75FB 105091~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan SPlit 1~|~05 - 4R Maintenance - Resurfacing~|~9C247991759BAF1574E899A5F6858267D606302E 112665~|~1~|~1~|~01/IMS~|~Field paving of Culverts:FRA-71-21.61DEL-71-2.40~|~~|~70F6FD7CEB8D71662ABD16D3029A8590CC597CD2 118806~|~1~|~1~|~01/STR~|~Full depth roadway reconstruction work.~|~04 - Reconstruction - No Added Capacity~|~0A2AD78C0EAB8932B19A9AA07F3A55689B16DCD8 118806~|~1~|~2~|~02/STR~|~Sidewalk and curb replacements. ~|~28 - Facilities for Pedestrians & Bicycles~|~68952808FB984EFE7401A3F10B54F200286EA8E1 92881~|~1~|~1~|~01/S>2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): Resurfacing-Urban Paving City of AvonLOR 0254 2.83 (Sheffield/Avon Corp.) to 5.56 (200' W. of Clifton Way) (SUSPEND)(RESUME) LOR 0254 7.78 (300? East of Nagle Rd) to 8.85 (NE Avon Corp/Cuyahoga Co. Line).~|~05 - 4R Maintenance - Resurfacing~|~E862532063C4BF0BCC1EBCD61E270D29BF864B3C 92881~|~1~|~2~|~02/S>2~|~100% Local (Avon): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): Resurfacing-Urban Paving City of AvonLOR 0254 2.83 (Sheffield/Avon Corp.) to 5.56 (200' W. of Clifton Way) (SUSPEND)(RESUME) LOR 0254 7.78 (300? East of Nagle Rd) to 8.85 (NE Avon Corp/Cuyahoga Co. Line).~|~05 - 4R Maintenance - Resurfacing~|~02308687C2F911617D05934677AF7C7999F46D7E 111232~|~1~|~1~|~01/ENH~|~"01/ENH/OT/LCPD" - Licking County Park District approved TA project for construction of multi-use path under along TR-171 (Canal Road) from SR-79 to Village of Hebron. 4B37 Enhancements - see Cap Comments~|~28 - Facilities for Pedestrians & Bicycles~|~1FA2D6BB1C989F309731DD7B1C31D17B83CD3879 90202~|~1~|~1~|~01/IMS~|~Split for bridge work on the interstate system. ~|~47 - Bridge Preventive Maintenance~|~5CDEE8C6E58314372C871BE41F9AA35262E22A57 90202~|~1~|~2~|~02/S>2~|~Split for bridge work on the urban STP system. ~|~47 - Bridge Preventive Maintenance~|~0AA92362EACA3F449FF8668C220876F6DC9E9EDA 100668~|~1~|~1~|~01/NHS~|~SFN 4800303~|~17 - Construction Engineering~|~4827DCFDB1F8585BFEF56D584483A80FCB7AD70A 125055~|~1~|~1~|~01/NHS~|~Urban Paving NHS~|~05 - 4R Maintenance - Resurfacing~|~91E59EA21EC4CFCE75A973180F980A1F50331828 125055~|~1~|~2~|~02/S>2~|~Urban Paving STP >200,000~|~05 - 4R Maintenance - Resurfacing~|~F640F336E232E1D04AFD903C900727D184086F7C 120180~|~1~|~1~|~01/ENH~|~Multimodal enhancement project at 100% up to Federal CAP (80% Carbon Reduction and 20% Safety).~|~28 - Facilities for Pedestrians & Bicycles~|~D659E7FB57E954B5E1A7D2BC471388F813AE842D 115122~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F23E62F5B81A3E9101D15E56698DBB8A68C5FED4 119654~|~1~|~1~|~01/NFA~|~Plan split for grade separation work~|~22 - Rail/Highway crossing~|~1FE3D9EC4365691E78EC8AFCD931E5640AF2247E 99549~|~1~|~1~|~01/NHS~|~NHS Culvert: RIC-30-15.32~|~04 - Reconstruction - No Added Capacity~|~6A5044111CC2B4184F3C0683FCE3DE6FB56F5B62 99549~|~1~|~2~|~02/S<2~|~STP < 200000 Culvert: RIC-309-3.21~|~04 - Reconstruction - No Added Capacity~|~D90C123DFF94D88D01C045B31ADA91CA179F5EC0 24853~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~75EF9F8957E10D5B1790C05D8BB7A0A39340BBEE 97971~|~1~|~1~|~01/SAF/LCEO~|~"01/SAF/OT/LCEO" - CEAO HSIP Funding - CAP'ed @ $150,000.00 4HB7 - 4HB7 (100% Federal) - Pavement Marking upgrade on various County Routes County wide~|~21 - Safety~|~AB230FCE4D9626598129E6AD2D1F2DC95C0CA719 92856~|~1~|~1~|~01/STR~|~SCI SR772 1.99 Slide Repair On SR772, begin project 1.99 miles north of its junction with SR73. 80 Fed/20 State 01/STR/OT/State~|~21 - Safety~|~5031BC0DEB68E572B91D8B1412F59519E07C0DBF 92856~|~1~|~2~|~02/STR~|~Change Order to cover work on an Emergency Slide Project. DSR# SCI-001.~|~04 - Reconstruction - No Added Capacity~|~75FC31D193B184FA7617312BAE69FB5CB937AA9F 97381~|~1~|~2~|~02/S<2~|~Culvert replacement project. ATH 682 6.15. Urban other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~221170476EE52A380E264F4861E3882656BB299E 97381~|~1~|~1~|~01/STR~|~Culvert replacement project. MRG 37 3.95, 7.56, MRG 78 14.25, and 14.59 Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DEE8F7DF3719D1D8A359AF8EB674C7D1EF0FAE1A 116291~|~1~|~1~|~01/STR~|~Overlay in Highland County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ED0188C8F30739C8F7CFC020FB17951A7722970B 119066~|~1~|~1~|~01/MPO~|~Construction of sidewalk on Bach Buxton from Valley Wood to Provision Living and on Shayler from Bach Buxton to Long Lake.~|~28 - Facilities for Pedestrians & Bicycles~|~7D32AD216590B56CFE98CC1491616B07F7D57684 121864~|~1~|~1~|~01/STR/FRED~|~Pedestrian Facilities in the Village of Fredericktown. TAP Funded - Carbon Reduction/Safety Construction Phase at 80% 4CT7/20% 4HJ7~|~28 - Facilities for Pedestrians & Bicycles~|~12D5E82BF587B5C1CB5EABA20393D281D4A2FB7F 76687~|~1~|~2~|~02/NHS~|~100% Columbus funded utility work02/NHS/OT/Col~|~~|~24A46C232ADB85A86449A3B36EEA9304A1EA1A9E 76687~|~1~|~4~|~04/NHS~|~Minor existing bridg work2502100 FRA US33 27.51 Intersect: Cable Bowman Ditch2502135 FRA US33 27.51 Intersect: Cable Bowman Ditch04/NHS/BR/Ex~|~~|~5638A49601E5E464CEBA5C3B4916344B8893AD7D 76687~|~1~|~3~|~03/NHS~|~Construct new bridge for Bixby Rd over US-3303/NHS/BR/New~|~~|~7BC5F315560674A55D66450A520508662F823FA2 76687~|~1~|~1~|~01/NHS~|~Pvmt work to convert Rager Rd into cul-de-sacs.Pvmt work to convert Bixby Rd into an interchange01/NHS/PV/~|~~|~CEBECD235FD5DED4BE0983E9AC2A7F06D96AB6DF 122130~|~1~|~1~|~01/BRF~|~Replace single span bridge on Rector Road over Yellowbud Creek. Federal/State Exchange Project.~|~10 - Bridge Replacement~|~23E7AE86A07CCA6C358CF381BE1246D6EC6B3274 113673~|~1~|~1~|~01/S<2~|~This split will cover pavement replacement and associated work outside the CIty of Circleville.~|~04 - Reconstruction - No Added Capacity~|~0F4D5979A56F763E12E98B8620B0B51AAD812C08 113673~|~1~|~2~|~02/S50~|~Items associated with Resurfacing within the City of Circleville~|~05 - 4R Maintenance - Resurfacing~|~ACD9D68814C0ACA4985F5581F7F00B4B1B79FE4B 113673~|~1~|~3~|~03/S50~|~100% City Items - Full Depth Pavement w/in City, Sidewalk, Curbs, Curb Ramps and Pavement Repairs~|~04 - Reconstruction - No Added Capacity~|~77F999034ECDB59270C7D8A9C6A4387FB27B7526 124603~|~1~|~1~|~01/STR~|~CEAO HSIP Safety project to install and upgrade raised pavement markings and pavement markings on various county roads.~|~21 - Safety~|~E95CF2C55F2536BEE0954E20F73C7DC3BA1BC1A1 108480~|~1~|~1~|~01/IMS~|~auxiliary lane construction~|~21 - Safety~|~05C3EEEB0894FA0167C30F439A23FFBB1256AEBD 117224~|~1~|~1~|~01/IMS~|~Split for interstate resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~AB3C76AD87C47543AA8732168DBFA605B643F2C0 103885~|~1~|~1~|~01/S>2~|~Urban Paving on SR 201 in the City of Huber Heights.~|~05 - 4R Maintenance - Resurfacing~|~BA263182EFDA30E0587AE341071BE7AF60B606D3 118706~|~1~|~1~|~01/NHS~|~MEG US 33-6.30/6.45 686 ft/438 ft rockfall hazard remediation.~|~17 - Construction Engineering~|~0FCC4D1AC8D5ED5740CB7F041E3D3D5E20A6D9BE 85395~|~1~|~1~|~01/NFA~|~100% local funding for this project at this time.~|~01 - New Construction~|~7F15ED1F43D1483178F85621A1700E068CC076F8 120952~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of DEL SR 521 and DEL CR 34 (Galena Rd)~|~21 - Safety~|~17FB6E1D1E64F6375B10EDC8D0FF073DD6905721 109936~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2025. GAL 35 13.52-17.909 and GAL 735 0.39-1.059. NHS funded 80% Federal/20% State.~|~21 - Safety~|~4F375F5DD49FDA5C35195C05E587BC615031CEC9 109936~|~1~|~2~|~02/S5K~|~Guardrail upgrade/replacement project for FY2025. ATH 13 2.709-2.906, 3.933-4.944 and GAL 160 2.470-3.00. Urban federal aid funded 80 Federal/20 State.~|~21 - Safety~|~4E26035A5FE96F98962C1C05ECF6DB424FAF5FBD 109936~|~1~|~3~|~03/STR~|~Guardrail upgrade/replacement project for FY2025. ATH 13 0.08-2.709, 4.944-9.39 and ATH 144 4.44-14.14. Rural federal aid funded 80 Federal/ 20 State.~|~21 - Safety~|~E32618F27919E6B8884286CFE38741B7B7163CDC 109936~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement project for FY25. Bridge rail GAL 790 39.45, SFN 2704781.~|~21 - Safety~|~C9C5BE9015DDE48C27022DF6DCAD4D53A8971A17 94224~|~1~|~1~|~01/IMS~|~District wide bridge maintenance project.~|~13 - Bridge Rehabilitation~|~BDC725D6505175B9F3B43917FD7BA478EE72DB34 94224~|~1~|~2~|~02/NHS~|~District wide bridge maintenance project.~|~17 - Construction Engineering~|~29218C998AA12EAE71FE2B92EDBAE1864719B21A 94224~|~1~|~3~|~03/S>2~|~District wide bridge maintenance project.~|~13 - Bridge Rehabilitation~|~19010CD99FB27DEAF53542133E203DAC551A425D 122952~|~1~|~1~|~01/STR~|~ADA Compliance at Hocking Co Rest Area 10-29.~|~~|~8361990ACBBE512D6B2A2F4135669A1B6E3143AC 122986~|~1~|~1~|~01/MPO~|~Extend a shared bike and pedestrian path along US-42 from the entrance of Heritage Oak Park to State Route 741. Path to be 10' in width separated by grass lawn from roadway.~|~01 - New Construction~|~C3ECF47DC14172725056394A52D5D75A0FDECA82 123780~|~1~|~1~|~01/NHS~|~Superstructure Replacement.~|~13 - Bridge Rehabilitation~|~57CBA0C0DD7B0E314CBD349730FB2E31D2693D11 90833~|~1~|~1~|~01/CMQ~|~Construct a bikeway starting at State Route 202 running South East abandoned railroad right of way to Lost Creek. Will run North East on an existing turf shelf along the creek, cross Knoop Road, and go under the existing bridge on State Route 41 into the main section of the reserve. 1.67 mile trail from existing Great Miami River Recreational Trail at State Route 202 East of Troy connecting to Miami County Park District Lost Creek Reserve.~|~17 - Construction Engineering~|~F0A2286E6EDFD16E6698A2B846F9AA024412BF0C 116801~|~1~|~1~|~01/STR~|~Rural~|~05 - 4R Maintenance - Resurfacing~|~D228DA7069676FB7F64647810280869A4009E5DF 113409~|~1~|~1~|~01/NHS~|~Westbound bridge on SR 2 over Columbus Avenue was hit on Tuesday 4/28 by a vehicle on Columbus Avenue, damaging the north outside beam.~|~13 - Bridge Rehabilitation~|~83C8709C67653CAB9B6AF418F04F0C131B575E2B 89488~|~1~|~1~|~01/SAE~|~UPGRADE EXISTING PAVEMENT MARKINGS, INCLUDING CENTERLINE, EDGE LINE, AND RR SYMBOL MARKINGS at various locations in Mercer County.~|~21 - Safety~|~B826DACB4EA85CFAD4EF4C4B687B328C02171F1D 116579~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG SR 689 1.87, CFN 1881039.~|~04 - Reconstruction - No Added Capacity~|~4B0C2F60336886FCAAD7D5F9C03ECA9B50C4C2ED 114296~|~1~|~1~|~01/SAF~|~01/SAF/OT/PATA - 80% Federal (4HJ7) and 20% State (4BC7) - intersection improvements to SR 16/Summit Road in Pataskala.~|~~|~3314C00C17223B39719E4E6133D2892B9CE8A178 95536~|~1~|~1~|~01/NFA~|~General System chip sealing including pavement repairs and pavement marking on CAR-524 from SLM 0.00 to SLM 5.24 and JEF-646 from SLM 0.00 to SLM 7.36.~|~05 - 4R Maintenance - Resurfacing~|~3F8B4C40520EAE0B9FCD5C862AFA9C71EFD7303D 113714~|~1~|~1~|~01/SAF~|~Install a single-lane roundabout at the intersection of Stahlheber and Morman Road in Hanover Township.~|~21 - Safety~|~7C78CCE31F08F65398E34D0916D69D79DF0775C4 91717~|~1~|~1~|~01/BRO~|~Culvert repair~|~~|~BC7522107F5120846D6A86DCB413C8589C1724CD 98000~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2020.~|~21 - Safety~|~59A22A206C8E8836486F3900C2B0DDBB4CA5A5E1 98000~|~1~|~2~|~02/SAF~|~Replace the standard pavement marking with pavement markings containing wet reflective elements. Funded 100% State Safety.~|~21 - Safety~|~2F4490608A936D97B5825664AA6E267DB684FF6D 98779~|~1~|~1~|~01/MPO~|~Rehabilitate two bridges in Mill Creek Park...Orchard Meadow Bridge on West Drive and Rogers Bridge on Lily Pond Drive. These bridges are on private park roads, they are not on the functional class system and do not have SFNs.~|~13 - Bridge Rehabilitation~|~9B64752CCAE829233DFEBDEB6D3A5118B0034736 121859~|~1~|~1~|~01/SAE~|~Plan split for concrete speed cushions. ~|~21 - Safety~|~6BE2B2A2D31C72158B38576CD4C039C4500A8B70 114744~|~1~|~1~|~01/NHS~|~ROS overlay.~|~05 - 4R Maintenance - Resurfacing~|~C61480D613CCF17FC1D2BC08D74138BDC23F3860 87078~|~1~|~1~|~01/BRF~|~Rehabilitation to include superstructure replacement, modification of abutments and piers for new beams, approach work to correct vertical curbe deficiencies, new guardral installation on the bridge over St. Marys River. SFN 0634687 AUG CR 168 0266~|~10 - Bridge Replacement~|~BF53D8AE479AA013F2583C97B11FBCDB23669B0E 116909~|~1~|~1~|~01/SAF~|~District-Wide fast drying pavement markers~|~21 - Safety~|~140D3ACC01AD2C6E8E8EFAB62A894BE1FA861F95 116909~|~1~|~2~|~02/SAF~|~District-Wide fast drying pavement markers~|~17 - Construction Engineering~|~995A10CE7DC82C4FCEE436E8D1FBA578865B8A17 102474~|~1~|~1~|~01/STR~|~Resurfacing of CAR-164~|~05 - 4R Maintenance - Resurfacing~|~5A9F3A8951597C127DF2669EF56EF1229474A5FC 122938~|~1~|~1~|~01/NFA/GRAN~|~Multi-use path along the south side of River Rd~|~28 - Facilities for Pedestrians & Bicycles~|~68746851ACCE2BF673BE6D0C313F4EBF8C56C4C3 93731~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG 692 00.35, SFN 5303729. Not on any federal aid system funded 80 federal/20 state.~|~10 - Bridge Replacement~|~6F46E47BAE56FADD7597933829C1B099796613B0 119553~|~1~|~1~|~01/S>2~|~Operation & pedestrian improvements~|~21 - Safety~|~068568F3614D828A78E292BC8949D446B9A45E5E 93177~|~1~|~1~|~01/NFP~|~Repair abutments on four bridges (TUS-77-1980 L & R, SFNs 7902700 and 7902735, TUS-36-1720, SFN 7900511, and TUS-258-0389, SFN 7905564) in TUS County~|~13 - Bridge Rehabilitation~|~BDF2B24D233909975E19D5FCAEE9D5DE718BF14E 99552~|~1~|~1~|~01/NFP~|~VGCS bridge~|~13 - Bridge Rehabilitation~|~0DF8379B76D2A6FFA352790AFA9354C68C4088F6 102640~|~1~|~1~|~01/NHS~|~Bridge Replacement: ASD-250-11.61 (SFN 0304808)New Construction?Structure(repl) (002)?General Appraisal?Deck?Wearing Surface ~|~10 - Bridge Replacement~|~16C827D247BD398D1A7EC400D3D8A2EAF1D67F5A 118887~|~1~|~1~|~01/STR~|~Resurfacing SR 45 from SLM 22.03 to SLM 22.13~|~05 - 4R Maintenance - Resurfacing~|~80F0F0552D6C21F48102EB9A4CF6F77B3474C7F8 118887~|~1~|~2~|~02/S5K~|~Resurfacing SR 45 from SLM 22.13 to SLM 26.91~|~05 - 4R Maintenance - Resurfacing~|~02899E9C4594E27B9A3A8522C42B3AF807D1A92A 117452~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County.~|~44 - Other~|~B57788AD01CF89FFD1F1D6B7EB023238483F53C4 126755~|~1~|~1~|~01/SAF~|~Plan Split for CEAO Safety funding~|~21 - Safety~|~89FA02FBB27ADE72515F433B23B81457971B84DE 110101~|~1~|~1~|~01/NFP~|~Signing Plans split~|~21 - Safety~|~4399CD436C256D29B35E69C53A70FE4F6F50AF39 125431~|~1~|~1~|~01/STR~|~Drainage system relocation and reconstruction.~|~04 - Reconstruction - No Added Capacity~|~F7119286FB8775EE6DEECA7BA759335E07357708 92721~|~1~|~1~|~01/MPO~|~State Street CR 667 0.00 - 0.61~|~05 - 4R Maintenance - Resurfacing~|~BD3342B4C19C7C45F1A7832E204AA5532FAF1049 97010~|~1~|~1~|~01/STR~|~from SLM 8.03 to SLM 8.89~|~05 - 4R Maintenance - Resurfacing~|~34839068D8F5F6A33C11473C305C9C498834B628 124810~|~1~|~1~|~01/S>2~|~Replace the storm sewer on the west side of SR 3 and repair slopes at culvert~|~04 - Reconstruction - No Added Capacity~|~913102D8BD8A3A8CAE5E1D9D008A9E7709F05175 93146~|~1~|~1~|~01/S>2~|~Reynoldsburg urban paving of US-40, 22.45-25.19~|~05 - 4R Maintenance - Resurfacing~|~530E31333A6E08B1076522C09F499525B129A9CD 75628~|~1~|~1~|~01/NHS~|~Rehabilitate bridge size culvert GRE-68-1481 (SFNs: 2901560) that carries US 68 over Conner Branch. Rehab to include concrete repair and scour protection. Rehabilitate bridge size culvert GRE-444-0195 (SFN: 2902613) that carries SR 444 over a tributary of Hebble Creek. Rehab to include concrete repairs, installation of a paved invert, and slope repairs. Rehabilitate bridge size culvert GRE-444-0260 (SFN: 2902672) that carries SR 444 over a tributary of Hebble Creek. Rehab to include slope repairs, concrete repairs, and invert repair. (The GRE-444-0195/0260 structures were previously included with project 25171.)~|~10 - Bridge Replacement~|~18255DA6370952D1EDFD4DABAE173BDE474D8746 116617~|~1~|~1~|~01/SAF~|~Add roundabout to CR 28 (Frankfort Rd) and CR 65 (Crissey Rd).~|~21 - Safety~|~042BB7BC0E84E4E1C570BD41C4CC9085615248D0 114059~|~1~|~1~|~01/NFP~|~Bridge Hit HUR-18-1523L [SFN 3900274]~|~17 - Construction Engineering~|~64E38CE4FB36DA7B8364C54E7BB20F9773AAA169 95380~|~1~|~1~|~01/ENH~|~test~|~17 - Construction Engineering~|~F91C85B61E3C6110B37F00B343DA1AB8A479CCE8 95380~|~1~|~2~|~02/NHS~|~test~|~~|~B265924CF9C2A661FDC474E3E9942A6FF8975827 95380~|~1~|~3~|~03/SAF~|~test~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~6D2694879F473DDFE78A87FBA3427A2710A28F01 100646~|~1~|~1~|~01/STR~|~Microsurfacing of JEF-43 from Richmond WCL to SLM 20.54, including minimal pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~52BFAA536E7D23F499FAD597B03BA0968ADD62F9 112921~|~1~|~1~|~01/NHS~|~LAW 52 15.00-18.00~|~05 - 4R Maintenance - Resurfacing~|~2FD3D39E8B82169AFA41A00FF076A0F46F477961 112921~|~1~|~2~|~02/SAE~|~Recessed-Wet Reflective Pavement Markings.~|~21 - Safety~|~876BC08E0B766B2EE7A1FF6E98DA146ABB04C62C 112921~|~1~|~3~|~03/NHS~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~ED0D11C383412D1B412D7920CE753F5A9D7DCAB8 112921~|~1~|~4~|~04/NHS~|~Culvert repair. ~|~04 - Reconstruction - No Added Capacity~|~0657B116F6E6F14E926D7AE8C969E91D5847FEB9 112921~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~BCD6D0B7DA2F27EC6E31DF0554A5D6D21B05D149 100393~|~1~|~1~|~01/STR~|~Slide remediation along State Route 88 at the Mosquito Lake, Trumbull County.~|~44 - Other~|~D9B42789CD6532DB44D9D4F6D22A43CED839EC90 109128~|~1~|~1~|~01/S>2~|~Demo Plan Split~|~16 - Right of Way~|~9CB484447A8D18598589E546D70C5D1D8F984C6E 117516~|~1~|~1~|~01/STR~|~All items of work associated with PIC-62-6.94 culvert~|~66 - Resilience Improvement - Highway Project ~|~F90A1C7440413F65FB3192BC8F9DC7893299C227 120297~|~1~|~1~|~01/S>2~|~Bridge over both CSX and NS railroad tracks to connect Ashville Pike Road with Thoroughbred Drive. ~|~22 - Rail/Highway crossing~|~A338201987B565830590B52A550FB2F6E7C9C073 117130~|~1~|~1~|~01/S>2~|~This split includes all work associated with the project~|~05 - 4R Maintenance - Resurfacing~|~DE53DA9D65D9A8638B03F8CC34D5F7D98246D4FB 22772~|~1~|~1~|~01/NHS~|~WIDEN US 250 FROM STRASBURG SCL TO CR 74 INCLUDING REPLACEMENT OF BRIDGE 05.11. RECONSTRUCT INTERSECTION WITH CR 78, CR 102 & RAMPS A/B INCLUDING TRAFFIC SIGNALS AND LIGHTING. This is an unfunded project.~|~21 - Safety~|~E694E5FB615DEE307A4FF46A01C76AD2D07B0B03 114805~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~050F23050346E98423C39B44CAF9C9FBB2DD1162 108911~|~1~|~1~|~01/ENH/STRA~|~Village of New Straitsville Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - Sidewalks and Drainage on 1) Per-SR 93-1.04 to 1.09; 2) Per-SR 93-01.40 to 01.44; 3) Per-SR 93-01.82 to 02.00; Per-SR 216-01.78 to 01.87~|~28 - Facilities for Pedestrians & Bicycles~|~067E653733560F4CD2C937CE8DB05E3160D57AD4 108911~|~2~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Resurfacing of portions of SR 93 and SR 216~|~05 - 4R Maintenance - Resurfacing~|~CD4C169706FDBB648CF73B3B74BD3D723A48A0EC 105652~|~1~|~1~|~01/STR~|~WOO-281-9.36 bridge.~|~13 - Bridge Rehabilitation~|~0A0D6A112A8EE5F37924509308F102E03F9B834E 95792~|~1~|~2~|~02/NHS~|~Bridge Plan Split~|~13 - Bridge Rehabilitation~|~1EB2108D31B2CC6902A2DDB22F8C10D6582EAC63 95792~|~1~|~1~|~01/NHS~|~from SLM 13.88 to SLM 19.96 and then from SLM 22.24 to SLM 24.25~|~05 - 4R Maintenance - Resurfacing~|~F1BD7A14B442B9BA95DA8A4A1096C811AF53AA71 100567~|~1~|~1~|~01/IMS~|~Resurfacing IR 77 from SLM 12.39 to 20.73 (US 250).~|~05 - 4R Maintenance - Resurfacing~|~E12787674EBA519559D608EB3614A051032CB3A3 100567~|~1~|~2~|~02/STR~|~Resurfacing SR 751 at the Stonecreek interchange.~|~05 - 4R Maintenance - Resurfacing~|~72C61C7FB8E1F218B61F9D850820FE60F19EBE51 109013~|~1~|~1~|~01/STR~|~Culvert replacement at HOL-60-6.60 and HOL-62-5.24.~|~04 - Reconstruction - No Added Capacity~|~B03015CDF30CEBAA63034D0B0CE456119545DBB9 109013~|~2~|~2~|~02/NFA~|~Culvert replacement at HOL-60-2.99~|~04 - Reconstruction - No Added Capacity~|~6C4F0D3EAD02AE2BB6A864F92230E5FB60E4AEC0 107538~|~1~|~1~|~01/STR~|~Resurfacing CAR-542~|~05 - 4R Maintenance - Resurfacing~|~AAEAF6D147BEA28352C22EF5DFE7FF9D1E733B29 101265~|~1~|~1~|~01/NHS/STRE~|~Resurfacing POR SR 43 from 17.91 to 18.86, urban paving in the City of Streetsboro.~|~~|~BE3A6D237BFC7067C1BB336E232F550B07130744 115028~|~1~|~1~|~01/STR~|~WAY SR 0003 07.15-Culvert Replacement and WAY SR 0301-Culvert Repairs~|~04 - Reconstruction - No Added Capacity~|~25EBE8C0BA4DCCB959DB80BD9033944757CF5EAF 84750~|~1~|~5~|~05/NHS~|~District Allocation 80% 4PF7 / 20% 4PS7 Work on NHS route outside Medina Corp~|~05 - 4R Maintenance - Resurfacing~|~24827CAAF78AB5A6545D5C3FBD8A7A9914FB3B25 84750~|~1~|~3~|~03/S<2/MED~|~Urban Paving City of Medina - 80% District Allocation 4PF7 / 20% City of Medina 4BG7~|~05 - 4R Maintenance - Resurfacing~|~3523FA2790868A2907756D0C4376943167665788 84750~|~1~|~1~|~01/NHS/MED~|~Urban Paving City fo Medina - 80% District Allocation 4PF7 / 20% City of Medina 4BG7~|~05 - 4R Maintenance - Resurfacing~|~73877FB930A2FB64DAD57DD015934AEA0E1BF13B 84750~|~1~|~2~|~02/NHS/MED~|~Urban Paving City of Medina - 100% City of Medina 4BG7 Items that are 100% City Responsibilty.~|~05 - 4R Maintenance - Resurfacing~|~E40EE77E305E44EC2C6837C89DBF41215C375643 84750~|~1~|~4~|~04/S<2~|~District Allocation 80% 4PF7 / 20% 4PS7 Work outside City of Medina corporation limits~|~05 - 4R Maintenance - Resurfacing~|~F108F0127F711D7C6CE93C31289D3F68604D8581 110734~|~1~|~1~|~01/NFP~|~Construction Inspection~|~17 - Construction Engineering~|~D4F4CBC626BAE680C58EC9F5F5090F98ACCCD6CC 119894~|~1~|~1~|~01/IMS~|~Longitudinal joint repairs on HAM-75~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68961AECA53B5CBB04DDE005772A05266D212CB1 105647~|~1~|~2~|~02/IMS~|~District 5 Rest Area Funds - 4BR7 (100% State) - See CAP Comment - Replacement of lighting at GUE IR 70 3.48 Westbound Weigh Station.~|~21 - Safety~|~77A64CEF6AF2B8B79672F61A3408FF7BCF9981EF 105647~|~1~|~1~|~01/IMS~|~District Preservation Lighting Funds - 4PF7 (Federal 90%) / 4PS7 (State 10%) - No CAP- Replacement of lighting at IR 77/US 40 interchange.~|~21 - Safety~|~66A1D7C22C7E05D571B44E5C85CABECAF9B64D89 119007~|~1~|~1~|~01/IMS~|~Plan split for work associated with widening and raising the WOO-75-2993 bridge~|~13 - Bridge Rehabilitation~|~CAF6969E3F13E20A7F3FF9B36F0F1B4C1BE89A3A 119007~|~1~|~2~|~02/NFP~|~Bridge repair for fire damage.~|~13 - Bridge Rehabilitation~|~182EA6EC7EF5667D9B712401B524BD61B4FCFD94 106415~|~1~|~1~|~01/NFA~|~Replace Heil Drive Bridge over Sycamore Run~|~10 - Bridge Replacement~|~FABCB445AA857D251D92F6292F8D0ADC61310509 126703~|~1~|~1~|~01/ERD~|~Traffic signal upgrades at the intersections of SR 741 with Courseview Drive and Beach Boulevard.~|~21 - Safety~|~C0EFC30257F2DDDE7BE3566D929B6307979AD5FB 117668~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 78 6.22, SFN 5601622~|~10 - Bridge Replacement~|~712878C72D39484CBF30750CAF3257E956F5C64B 110987~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation~|~13 - Bridge Rehabilitation~|~872B8D55845A4954AAE76DD4191614F84A85C6C7 119537~|~1~|~1~|~01/STR~|~Plan split for federally eligible design build team costs~|~10 - Bridge Replacement~|~944FF8AB803C33305AF05DF0D9E52BAB6C3F2B65 117851~|~1~|~1~|~01/MPO~|~Plan Split for TMACOG STBG & CMAQ Funding~|~04 - Reconstruction - No Added Capacity~|~0F023829B61BEC8BF29AC6615F8D04A5C9489440 85291~|~1~|~1~|~01/STR~|~Resurface WIL SR15 8.01-14.81~|~05 - 4R Maintenance - Resurfacing~|~7171AD097EE6A61836FF5B5C89952009513B050F 115082~|~1~|~1~|~01/SAF~|~Flowage Easement Mitigation work~|~44 - Other~|~B6B319C01917B6DE4FC2C8E8B0729ED7A3890BC8 99018~|~1~|~1~|~01/SAF~|~District wide fast dry pavement marking~|~21 - Safety~|~5B1D43CAA06A8964D37A8823947EDDE95CAA8A4A 102647~|~1~|~1~|~01/NFP~|~Construct material storage building~|~44 - Other~|~8BC17D5D8A4AAA31AF86009D73DE4DCADE191788 117232~|~1~|~1~|~01/MPO~|~Plan Split for STBG-funded compact roundabout at the intersection of Monclova Rd and Waterville Monclova Rd. ~|~21 - Safety~|~32453164563A7ECFEC1487B4D80127372D01160A 117232~|~1~|~2~|~02/CMQ~|~Plan split for CMAQ-funded roundabout at Albon Rd and Monclova Rd.~|~21 - Safety~|~71004A96C04E7ADD6D2D6C0D4162526044AB6367 94333~|~1~|~2~|~02/S<2~|~Added second split for Split Corp with Tiffin~|~05 - 4R Maintenance - Resurfacing~|~D27A86E7B873AC60B61E40A7B0DC1B36B01896CB 94333~|~1~|~3~|~03/S<2~|~This split is for items ineligible for urban pav (walk removed, curb ramp, full depth pav repairs)~|~05 - 4R Maintenance - Resurfacing~|~8C28FB3D14EED43E34CCC19FC4600093D02C480E 94333~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 8.07~|~05 - 4R Maintenance - Resurfacing~|~E1C62CA8215E26B5A751F04CC70C3AB34BA837C8 114327~|~1~|~1~|~01/NFP~|~Split for tree trimming/removal~|~99 - State Preventative Maintenance~|~98B50EF9CF587676602FD4096262AD61D6C1AF9B 92439~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 147 7.79, SFN 6102794. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~1D08736E3ED1D36F88805017368608CEF4740467 116434~|~1~|~1~|~01/NFP~|~2-Year districtwide lighting maintenance and repair. Includes LED upgrades.~|~21 - Safety~|~BFA779A9E636518E7983DA4E96BCC23A9D40A67F 114927~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~F3A663913D1812713F99F5B51A61C8E0C8976268 116910~|~1~|~1~|~01/S5K~|~Asphalt resurfacing project on ATH CR 33 1.94-2.52, 4.25-4.88 and ATH CR 178 0.00-0.57. Concrete repair on ATH CR 33 2.52-4.25.~|~05 - 4R Maintenance - Resurfacing~|~424E0C7BF5280913C396B44BAAE036D8ECC9EBCA 97544~|~1~|~3~|~03/BRF~|~SFN 7030924, Ohio Bridge Partnership Program, Kuhn Road over Marsh Run~|~10 - Bridge Replacement~|~2000BB86C6641A7BF2E4370CB5525E573CBB8A8B 97544~|~1~|~2~|~02/BRO~|~SFN 3942252, Ohio Bridge Partnership Program, Fairfield Angling Road over East Branch of the Huron River~|~10 - Bridge Replacement~|~3CE55F74B29C2F771F2A4693AECB55C3292BBC8F 97544~|~1~|~1~|~01/BRF~|~SFN 3946142, Ohio Bridge Partnership Program, Plymouth East over East Branch of the Huron River~|~10 - Bridge Replacement~|~B01ED5A3DC59551F47A3090BA516CB7086D2C3B7 115790~|~1~|~1~|~01/SAF~|~Safety improvements.~|~21 - Safety~|~B01C1419124218A9A8B6DD5E090B334EE6584F6D 115790~|~2~|~2~|~02/NFP/YOUN~|~Waterline replacement.~|~43 - Utilities~|~FF2133BC8AD5BDEBD2C4254E0745B7C479B79D83 81000~|~1~|~1~|~01/STR~|~SR-582 from SLM 6.92 to SLM 10.05~|~04 - Reconstruction - No Added Capacity~|~719E02C074AF4EDEC36D764AB2CBF42E07097237 81000~|~1~|~2~|~02/IMS~|~Plan split for SFN 8707057~|~13 - Bridge Rehabilitation~|~B794958B966D432FA84C2618F9991D09AB477B9A 81000~|~1~|~3~|~03/STR~|~Plan split for SFNs 8707073 & 8707111~|~13 - Bridge Rehabilitation~|~1964FD8CAD3EA9F4D257D2719AF3E201D00AC3AC 81000~|~1~|~4~|~04/STR~|~Culvert on SR582 @ 7.828~|~04 - Reconstruction - No Added Capacity~|~E44239F288E191FC2D8404BE7B83B4C5BBAA6D0E 85247~|~1~|~4~|~04/NHS~|~Structural Steel Repair on SFN 0600245 AUG 33 1310 L and SFN 4600274 LOG 33 0696~|~13 - Bridge Rehabilitation~|~18FD8131DFD949E38A422843C0BDD273CD68434C 85247~|~1~|~1~|~01/BRO~|~Structural Steel repairs on SFN 5706904 MOT 75 0712; SFN 1204238 CLA 70 1101 R; SFN 0602078 AUG 75 0498 R, and Structural Steel Repair on SFN 5503094 MIA 75 1569~|~13 - Bridge Rehabilitation~|~37D23DDAFC191E3A6A76125596223B0D222C844F 85247~|~1~|~2~|~02/IMS~|~Structural Steel repairs on SFN 5501717 MIA 75 0043; SFN 1204327 CLA 70 1208 L;SFN 1204351 CLA 70 1208 R; SFN 1204203 CLA 70 1101 L; 7502648 SHE 75 1883; SFN 1205013 CLA 70 2080 L; SFN 1203630 CLA 70 0173; 0602280 AUG 75 0754... more Structural Steel repairs on SFN 5501717 MIA 75 0043; SFN 1204327 CLA 70 1208 L;SFN 1204351 CLA 70 1208 R; SFN 1204203 CLA 70 1101 L; 7502648 SHE 75 1883; SFN 1205013 CLA 70 2080 L; SFN 1203630 CLA 70 0173; 0602280 AUG 75 0754 R; SFN 1206575 CLA 370 0312; AUG 75 0754 L; SFN 1206576 CLA 70 0310; SFN 7502672 SHE 75 1883 R; SFN 1204955 CLA 70 20.80 L; SFN 7501773 SHE 75 0614 L; SFN 0602043 AUG 75 0498 L;~|~13 - Bridge Rehabilitation~|~4B1D7BA0B764D6BEFCE8915B136A86E60D5EB2AC 85247~|~1~|~3~|~03/BRO~|~Structural Steel Repair on SFN 5503094 MIA 75 1569.~|~~|~5E4A5432C314E8666F861AC81BE499E0F5BE873B 85247~|~1~|~5~|~05/STR~|~Structural steel repair on SFN 5501148 MIA 48 1548;~|~13 - Bridge Rehabilitation~|~9B88ED07447891B42BE36E0FF3A732FF26E1AC58 107895~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 537 3.40-3.97. DSR MOE-016. Rural other federal aid funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0AB24204AADE81D62F92D1936E8D34006B05C816 123721~|~1~|~1~|~01/BRO~|~All Work is within this split.~|~13 - Bridge Rehabilitation~|~75F3CC153BBD696073BCB0CC4A52733F65A49276 91835~|~1~|~1~|~01/NFA~|~general system asphalt overlay on BEL-379-0.00 to 6.66; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~F988E169EB3F03E2121281C4F97D9AD6E3C16E67 114741~|~1~|~1~|~01/STR~|~LAW Chipseal.~|~05 - 4R Maintenance - Resurfacing~|~434E5EE9575C72455A090D8EED456C4CAFA07EC5 101216~|~1~|~1~|~01/NFP~|~District maintenance preservation for district wide mowing project - 4CP7 (100% State).~|~44 - Other~|~C519254E37848E6E7DD4E9B7BA9A050379EB9010 88338~|~1~|~1~|~01/S<2~|~"01/S<2/OT/VIOL" Violet Township SRTS Sidewalk Project.~|~28 - Facilities for Pedestrians & Bicycles~|~4DEB75A402DABF1C55189229110F5F09DE41DFF1 115945~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 106 0.00-1.05. Funded through the Local Roads Oil and Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~795A3A690892201A07931DB99E92914321E578D3 100342~|~1~|~2~|~02/NHS~|~WOO-51-0.00 to 3.38~|~05 - 4R Maintenance - Resurfacing~|~D688220A122A2E330D5BF24EB256EEEFAB10D881 100342~|~1~|~1~|~01/STR~|~OTT-51 from 7.91 to 10.39~|~05 - 4R Maintenance - Resurfacing~|~EE32903B68D6CEA7E802C881175D7974F148EB61 115518~|~1~|~1~|~01/BRO~|~Bridge replacement. 80% federal with an 20% match provided by Van Wert County. After all the federal funds cap is used funding will be 100% local funds from Van Wert County.~|~10 - Bridge Replacement~|~1177F48ED14500B3FCE08FB9173AE9C8268E9F4D 93444~|~1~|~1~|~01/CMQ/Tall~|~Safety and capacity improvements, including the addition of turn lanes and pedestrian corridor improvements, especially drainage, from Tallmadge Circle to Garwood Road, in the City of Tallmadge, Summit County, Ohio.~|~21 - Safety~|~6FEFC06FDD63AF0A2DAB81B3320BE0AD807ADEA9 93767~|~1~|~1~|~01/IMS~|~AUG-75-5.15 L/R (SFNs 0602132 & 0602108) - remove and replace concrete parapets.AUG-75-5.45 (SFN 0602159) - restore semi-intergral bearing retainer functionality and patch spalled concrete at bearaing areas.SHE-75-11.08 (SFN 7502192) - overlay bridge deck, patch piers, retrofit parapet & conversion to semi-integral abutments and to include bridge painting.~|~13 - Bridge Rehabilitation~|~F9DAB2DA4ABB64DB4A4A38C0F20184B80A1CCA44 93767~|~1~|~2~|~02/IMS~|~Parapet retrofit to add "wapakoneta" on the bridge over IR 75~|~~|~ED638FA8B057C95DCECE375364E09F80D4C7039C 108830~|~1~|~1~|~01/STR~|~Culvert liner project. MRG 266 2.73. 80% Federal and 20% State funds.~|~04 - Reconstruction - No Added Capacity~|~4A6CAAB71A654A391558E8BF68E1DDC10C91BE82 107515~|~1~|~1~|~01/STR~|~Resurfacing BEL-148~|~05 - 4R Maintenance - Resurfacing~|~78EE53FC63027D12309CC8DCAB53F216237240A6 91715~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 5.38 (SFN 3701085). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~23FDC1542DAF9C620445E8974C35FA063F6F763F 115064~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH CR 49 0.04, SFN 0537985.~|~10 - Bridge Replacement~|~1B311AC9C6A9DD0E80016B20F900E7915CDCD93A 101033~|~1~|~1~|~01/NFA~|~In the Village of N. Baltimore, sidewalk and crossing improvements along the N. side of Maple St. from Rhoades Ave. to Rudolph Rd.; upgrade signage and markings.~|~21 - Safety~|~33D9B1071FC59ADEAA3CA3F38994541616006246 110427~|~1~|~1~|~01/SAF~|~Intersection safety improvements using federal-aid funding~|~21 - Safety~|~87FD7BE83679B8859444921A4264E7934E2B0766 87094~|~1~|~2~|~02/STR~|~Funding split for work associated with the sealing of bridges GRE-72-0707 and GRE-72-0771.~|~13 - Bridge Rehabilitation~|~1269228F7579DC608A1AAC447E1F69941FB569D2 87094~|~1~|~3~|~03/NHS~|~Costs associated with bridge GRE-72-0837 over US 35.~|~13 - Bridge Rehabilitation~|~866276F638290AA66D641F499205176B2AAD0C1F 87094~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 72 in Greene County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A8EC37CB65D60963A14EE45CD4DAEFF0D34A3C2B 110676~|~1~|~1~|~01/STR~|~Resurfacing of POR SR 305 from 5.65 to 7.36, TRU SR 305 from 0.00 to 1.57 and TRU SR 534 from 10.41 to 12.48.~|~05 - 4R Maintenance - Resurfacing~|~02433E37FAC379B3E227B586C4A7955D358E24FE 105192~|~1~|~1~|~01/STR~|~plan split for the rural sections of the chip sealing:GRE-380: SLM 0-6.36~|~~|~6D0C2474D027CAA6E50D2C4FDD1CBEA40ED35F69 105192~|~1~|~2~|~02/S>2~|~plan split for the large urban chip sealing sections:GRE-380: SLM 6.36-7.03~|~~|~96E2A400C7D12416D69CCDF7308CDB04478B18F8 93178~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete on SR 72 from SLM 9.30 (College Avenue) to SLM 10.04 (Second Street),~|~05 - 4R Maintenance - Resurfacing~|~105886801642BD3B5E0F014736D8535B381BBBE9 98955~|~1~|~1~|~01/S>2~|~McCord Rd~|~05 - 4R Maintenance - Resurfacing~|~ACF0079C1CBC7A4296D1DEA187E78B237B2BA18F 118847~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~D78BA36DB0C5AB5B20185146C9CDEAF4F137E236 109021~|~1~|~1~|~01/NFP~|~Type A repair contract for median barrier~|~44 - Other~|~0C3245FE0232444732779AB7BEC59044F797F3BD 99553~|~1~|~1~|~01/NFP~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~71DB2B0351F0FD6983BA2A639473822AC6C47A48 94936~|~1~|~1~|~01/SAF~|~Widen radii at sw corner dayton/central and ne corner dayton/broad for truck turning~|~21 - Safety~|~67A1CDD2C191D031527C4C86AAB41A694EA5183B 120363~|~1~|~1~|~01/NFP~|~Split for Cracksealing work~|~99 - State Preventative Maintenance~|~B03658E69ADB59126885B2F6579553DBC3A5BA76 117604~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 298 0.54, SFN 8437505. Funded 100% Federal.~|~10 - Bridge Replacement~|~24A5B00A8CB2A5CAEF7E6E89B0C0DA2B4A7B573D 84495~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on I-75 from north of Glendale Milford to Kemper.~|~05 - 4R Maintenance - Resurfacing~|~3490EB19E30C3E16C0D37B08A16B7298AB1A0D65 84495~|~1~|~2~|~02/IMS~|~Funding split to include all work on the following bridges: HAM-75-1539L (SFN 3110923), HAM-75-1539R (SFN 3110958), and HAM-75-1642R (SFN 3111075).~|~13 - Bridge Rehabilitation~|~F2F054CFE444E63BE87ADC28E4EE65431EE3E116 104848~|~1~|~1~|~01/NHS~|~Bridge deck patching on FRA 315 2.78 over the Olentangy River, Fifth Ave, King Ave~|~13 - Bridge Rehabilitation~|~4053A8D9660711EA17583057902C9AC51E66152A 87097~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 350 in Warren County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6DB9901985D81BE651E5180006BC9456B751F04F 103404~|~2~|~2~|~02/S<2~|~Landslide repair. DSR#BEL-011.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6CB9029AA9A426E9D8ABDDD2DAAF492148A082E 103404~|~1~|~1~|~01/S<2~|~Landslide repair. DSR# BEL-010.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C7DDB8C5F4093C68F70FAA7E629186B15D87F602 103404~|~3~|~3~|~03/S<2~|~Landslide repair. DSR# BEL-015.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF58F656D91DCC7701EE4F4ECD3BE24D41CFCE87 95736~|~1~|~1~|~01/NFP~|~2 year const inspection in D6~|~17 - Construction Engineering~|~4F51C106835AC157E01A1DA75DE5109B28407E83 84594~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 339 1.25-4.38. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E09B21032D781CCAEE2E59B57449CF01A1EECAD6 84594~|~1~|~2~|~02/S<2~|~Two-lane asphalt resurfacing project using an asphalt overlay treatment. WAS 339 0.41-1.25. Urban other federal aid funded Federal 80% and State 20% funds.~|~05 - 4R Maintenance - Resurfacing~|~13F5E59AB9F93192E5D98B62E9986F7B3F337B0B 84594~|~1~|~3~|~03/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 339 0.00-0.41. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E4EB1B92032133CDB86F2AA3C6FF10B3FF0F9B15 84594~|~1~|~5~|~05/NHS~|~100% City items on WAS 7 21.85-22.72. Full depth repair and curb ramp work.~|~05 - 4R Maintenance - Resurfacing~|~67A1D2BA32F151A24105C52991E676CBEAACFF77 84594~|~1~|~4~|~04/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 7 21.85-22.72. Urban paving in the City of Marietta. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~5077B21CD6C6395F154447DCD8C3ADB69B4FBE2E 84594~|~1~|~6~|~06/STR~|~Change order for rumble stripes on WAS SR 339 locations. 100% Federal Safety funds. SAC 4HJ7.~|~05 - 4R Maintenance - Resurfacing~|~CAD37784F9C3337F4528B3C8C6198120E1F9E6FE 110521~|~1~|~1~|~01/CMQ~|~Columbus CTSS Phase F~|~21 - Safety~|~83DEB1F20CD1DC62633553E55BC8B8D619674206 110521~|~1~|~2~|~02/SAF~|~Local City of Columbus Department of Technology (DOT) funded items.~|~44 - Other~|~E3E12ACA30C2068AF8923A038EB1C323AB120D61 126742~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding. ~|~44 - Other~|~7874E236EC3A3CD92F803BA0D2139070F413D84D 93899~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B) 100% state~|~21 - Safety~|~D787F17A1541E770FBECF62B4EF968AF0B33EC63 87303~|~1~|~1~|~01/BRO~|~0802018 BRO US68 41.42 Intersect: Solomon Run80 Fed/20 State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~601F1BB196F2A9D6B02AA8BEC6C0E191AFA076CE 97710~|~1~|~1~|~01/NFP~|~Added plan split for subphase change~|~44 - Other~|~53B1B1E7367EA1701C4EB5FE89195371BEAAADE3 105262~|~1~|~1~|~01/IMS~|~Bridge Rehab on interstate bridges.~|~13 - Bridge Rehabilitation~|~B64D3CAE28E5312AA0F4AA313D23F8C7B830902D 105262~|~1~|~2~|~02/NHS~|~Bridge rehab on NHS route bridges.~|~13 - Bridge Rehabilitation~|~2A162F59259A885A2E93DE8FD32AC19852D325AB 120305~|~1~|~1~|~01/NFA~|~Sidewalk replacement and installing new ADA curb ramps.~|~28 - Facilities for Pedestrians & Bicycles~|~797BF4CD239567BB18E88FFD830784A5BEC3FE95 107783~|~1~|~1~|~01/STR~|~Created plan split~|~13 - Bridge Rehabilitation~|~24769F3C865B6066EDD270A93BFBB075086093EE 94385~|~1~|~1~|~01/STR~|~STR Rural Resurfacing: HUR-601-00.00 (SR 18) to 01.96~|~05 - 4R Maintenance - Resurfacing~|~90E5C14E0C9D470007C4C137A6F4979E090DFC8C 94385~|~1~|~2~|~02/S5K~|~STP 5,000 - 49,999 Resurfacing: HUR-601-1.96-5.01, ERI-601-0.00-0.93.~|~05 - 4R Maintenance - Resurfacing~|~D9BDC36AE03CFE503932B7ABAD92BD86FF612215 94151~|~1~|~1~|~01/IMS~|~Resurfacing of pvmt on I-70 from SLM 3.41-7.60 No bridge work at this time~|~05 - 4R Maintenance - Resurfacing~|~030DD67DB485249E35EE26D6519104732C060740 96096~|~1~|~1~|~01/STR~|~Rehabilitation of GUE-658-11.01~|~13 - Bridge Rehabilitation~|~0A8A4331D5FCAB66AE517B2E125310A71FE84B5D 96096~|~1~|~2~|~02/STR~|~Replacement of culvert on SR 666 at the 10.136 slm.~|~04 - Reconstruction - No Added Capacity~|~B21446D77608E00BE4D42CDFB7AE5D49FD6FE07B 21806~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1807536~|~10 - Bridge Replacement~|~D27B6363A40204D6B63FD32E6A07126DB320A29F 80988~|~1~|~1~|~01/ERD~|~Earmark funds to be used for all eligible work signal work at an 80/20 fed/local funding split using available OPWC funds for the local participation. The earmark can then be expended at 100% using TRC when all OPWC funds have been exhausted.~|~21 - Safety~|~3EA6B3BC0CD0FF855F64DC52BB1EA2DD6DE8A310 109357~|~1~|~2~|~02/IMS~|~Rehabilitate the Bridge that carries SR 28 over I-275 by overlaying the deck, replacing the barrier and replacing the Vandal Protection Fence.~|~13 - Bridge Rehabilitation~|~CC7D289A535207CEE413DD61778269BF239D7D2E 109357~|~1~|~1~|~01/SAF~|~This plan split includes all work associated with the safety project that will improve the intersection of SR-28 & Old 28, including the creation of a slip ramp from Old 28 to I-275. ~|~21 - Safety~|~A29DB535A009FD54A95350BFBAAF38B1BC76D8E7 109357~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~FA5CBFC4C68ECCA928F42FCDC207763C028BF425 105170~|~1~|~1~|~01/IMS~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~1CEEAEF9ACB15FFAA0FD57E099A17706AA6BC038 105170~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~B170502439D51326435247A9BCF76E780A0BE3BC 105170~|~1~|~3~|~03/STR~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~69D770D4F32D1FD17AEA416DD3D6770D86E40048 122239~|~1~|~1~|~01/SAF/PC~|~Expand culvert on West Avenue to include a sidewalk and high-visibility crosswalks for access to Plain City Elementary.~|~21 - Safety~|~817D562A9A9A9E7C2AB129D4203FC32AF262158A 112935~|~1~|~1~|~01/S<2~|~Marion Urban Area Plan Split: MAR-95-17.19-18.31~|~05 - 4R Maintenance - Resurfacing~|~DF557E1DD4233F435C072D17CF80236AAC7257F8 112935~|~1~|~2~|~02/STR~|~Rural Plan Split: MAR-95-22.89-24.32 MAR-309-22.77-26.88~|~05 - 4R Maintenance - Resurfacing~|~D026F2C1588B8EDB4A5B0A625AD759D7C2CD047C 122661~|~1~|~1~|~01/NFP~|~Bridge work on various structures in District 5.~|~47 - Bridge Preventive Maintenance~|~4C8BF8F18EEF1C3B8EC32923D3453B7745925C70 110980~|~1~|~1~|~01/IMS~|~Replace headwall; Replace last 20 outlet pipe; regrade and stabilize embankment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C78B7DD8F577209910469D63A5D6966A5A931067 110980~|~1~|~2~|~02/STR~|~Jack and bore new pipe for WAR-123-2089.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9400DF076B2F2C4D80B94922F07A1A7232CA9C66 96860~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail on various county roads within Lorain County.~|~~|~AE8500B461E897C19BC008BEAAE19F2A36E9B3F6 116302~|~1~|~1~|~01/STR~|~Chipseal project~|~05 - 4R Maintenance - Resurfacing~|~AF5C57B5437A933EB72F971A901D452ADC13B293 107298~|~1~|~1~|~01/NFP~|~Split for sign structure repair work.~|~44 - Other~|~B6EA8FA26CBA1C92A490879EB8E8C7F31C00F03A 107298~|~1~|~2~|~02/NFP~|~Split 2 for sign support repair due to collision on IR-77 SB north of Pleasant Valley Rd. ~|~44 - Other~|~DE5D3DE5729D61C8199C154D450E316C0276916E 107298~|~1~|~3~|~03/NFP~|~Split 3 for sign support repair due to collision on IR-90 EB at Babbitt Road. ~|~44 - Other~|~DEF432C2029752544A39DECDB1C973C16E55E9B4 107748~|~1~|~1~|~01/S<2~|~Work on all four signals is in this plan split. Work in inside urban areas but outside of municipalities. Federal urban STP funds. 100% federal funds provided by the District. No local funds.~|~21 - Safety~|~D72317436E31BAA5A065C2E1DDEAEE0927B3A1D4 108631~|~1~|~1~|~01/SAF~|~Funding split for Active Trans. / SRTS~|~28 - Facilities for Pedestrians & Bicycles~|~FAAB9AF8FCC6E29511B549F1F2D729882509744B 116918~|~1~|~1~|~01/S>2~|~Bridge painting & Deck overlay~|~47 - Bridge Preventive Maintenance~|~6A452C38C299CCC4D07F8EBC1AF3439A79DCB194 116570~|~1~|~8~|~08/NFA~|~Waterline relocation. Erie County portion. US 6 11.341 to 15.326. ~|~04 - Reconstruction - No Added Capacity~|~B0F1A34DF62B3BDA623A9A2F6C7FD47E8DC76CD2 116570~|~1~|~1~|~01/SAF~|~Roundabouts.~|~21 - Safety~|~BF5AF9B99C552C1EEB57149C0FAA86B5B8B2DD9A 116570~|~1~|~3~|~03/S50~|~Reconstruction of pavement, resurfacing and widening.~|~04 - Reconstruction - No Added Capacity~|~94BCF9444AA7DECB2F1B314AFB081B4DF7CE4FB8 116570~|~1~|~4~|~04/ENH~|~Pedestrian Shared Use Path~|~28 - Facilities for Pedestrians & Bicycles~|~6C088FADB48869910B394F5409422E825340256C 116570~|~1~|~6~|~06/BRO~|~Bridge rehab, railing and fencing.~|~13 - Bridge Rehabilitation~|~D2BFAD474DC6495C8A1A664C54E21F4A6355E344 116570~|~1~|~2~|~02/SAF~|~NHS Roundabout. ~|~21 - Safety~|~DA155F4CA59F123E3D2668B95FD85ECE76657645 116570~|~1~|~5~|~05/ENH~|~Pedestrian Shared Path on the NHS.~|~28 - Facilities for Pedestrians & Bicycles~|~403C4B810551A5C91866DE374C3A50567FA69065 116570~|~1~|~7~|~07/BRO~|~Bridge Rehab NHS, Bridge Railing & Fence~|~13 - Bridge Rehabilitation~|~9B9A3C741F20C20D8FEFFFC8EEE209348B64ADB7 100856~|~1~|~1~|~01/IMS~|~Smooth seal IR 70 in Montgomery County SLM 15.53 to 17.34.~|~05 - 4R Maintenance - Resurfacing~|~0FCBE5CB0A7450FB93D95340217767CC550999F3 125670~|~1~|~1~|~01/NHS~|~Plan split for the resurfacing on the NHS section ~|~05 - 4R Maintenance - Resurfacing~|~1E4408E30F713805A0C84746B52DC068452AA02E 125670~|~1~|~2~|~02/S>2~|~Plan split for the resurfacing on the large urban sections ~|~05 - 4R Maintenance - Resurfacing~|~F9E2AA6FD73E804222DC4ABD0D92BCB342ECF4BC 125670~|~1~|~3~|~03/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~EE88DDFFC0FE63DE8B9A4576C4855D32D3B5F2CF 124101~|~1~|~1~|~01/S5K~|~Bridge replacement project. VIN 683 0.35 (SFN 8203423).~|~10 - Bridge Replacement~|~505B5C10AE97697AEF65DFAE9E0C939480BF7663 125805~|~1~|~1~|~01/IMS~|~Signs~|~44 - Other~|~230AFFB76D39189F09C064685D183A8E7E47A25F 114869~|~1~|~1~|~01/NHS~|~Fine graded polymer.~|~05 - 4R Maintenance - Resurfacing~|~F0289DA2696D7939F4FD0C8C256A0D41E1DD42E7 88850~|~1~|~1~|~01/STR~|~01/STR/PV/ - District Preservation 4PF7 (80% federal STP) / 4PS7 (20% state) - No cap - Resurfacing on SR53 from slm 0.51 to 11.63.~|~05 - 4R Maintenance - Resurfacing~|~D929A9506676BA9E446ABF2D9AC659748209801F 98003~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2020.~|~21 - Safety~|~6C606F2928A5525FD04828F59057C52223CF8A0C 127199~|~1~|~1~|~01/MPO~|~Plan split 1 for STBG funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A9C1BF1CF581300834C39553265F544D66027AD4 105256~|~1~|~1~|~01/NFA~|~Plan split for bridge removal work~|~10 - Bridge Replacement~|~901AC14DB8C53C2A45F55DDCCB218230DE0465A7 111504~|~1~|~1~|~01/STR~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EC187DBD194647C9E35AE6829375AF0DA77AD091 111176~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Replacement of the superstructure and repairs on the substructure of SFN 6005586~|~13 - Bridge Rehabilitation~|~7FA68B811CABE430872E745A2B07DF4936F50F62 87378~|~1~|~1~|~01/STR~|~Rehab by replacing deficient deck with minimum road work (approach) on SFN 1100661 CHP SR 29 31.42 over Little Darby Creek, 0.57 miles East of State Route 4.~|~~|~F703057FB8806430E8527462DA635C9CD45D4D7B 119339~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0AF4EC2C1023EC9882D777512FCA14D7CCDB3707 119339~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance~|~47 - Bridge Preventive Maintenance~|~44B7212B04F86A80135B209DF84F9A76719AA6A2 106745~|~1~|~1~|~01/NFA~|~ODNR culvert work in Shawnee State Forest.~|~04 - Reconstruction - No Added Capacity~|~D0BBC79FE433CACE4211499D99C770DE068F438E 96283~|~1~|~1~|~01/S<2~|~Resurfacing of SR-123 (Central Avenue) from Dayton Oxford Road to west of Business Parkway.~|~05 - 4R Maintenance - Resurfacing~|~F42A2C36BFD2A7D57732E8300D57D2E8C842A560 109317~|~1~|~1~|~01/NFP~|~Reconstruction of intersection~|~03 - Reconstruction - Added Capacity~|~B89F10DD5092705410B72CACBD1ABE8CFE2818F3 119074~|~1~|~1~|~01/MPO/SYC~|~Construction of sidewalk along School Road (Township corp. limit to Stewart Elementary) and Solzman Road (School Road to East Kemper Road).~|~28 - Facilities for Pedestrians & Bicycles~|~FD67BABCCED2E5001D58F9A2A457E654DD46C425 119074~|~1~|~2~|~02/NFA~|~100% locally funded GCWW utilities items~|~43 - Utilities~|~42ED977FCAB535A425D28EA2855634EBDD5D596C 84208~|~1~|~1~|~01/SAF~|~Raised pavement marker (RPM) contract for FY 2014. Various routes and sections in D-10. 100% State.~|~21 - Safety~|~A09CDAD8CAE24DF82ECA6F67003E939486B54C31 109034~|~1~|~1~|~01/CMQ~|~Work to construct an all purpose trail that is eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~5512E2C5103A40AFD07DAED89AE136AD53177B18 98669~|~1~|~1~|~01/STR~|~LAW CR 10A- 00.91 (SFN 4432436)~|~10 - Bridge Replacement~|~F2821F70A64B75C9DE3CB9CCB2A92EA58882D957 85266~|~1~|~1~|~01/BRO~|~4801539 LUC SR25 7.92 Intersect: Norfolk Southern~|~10 - Bridge Replacement~|~FD9A8AC2B9E32B1EE45F8C298F47E2E78EDE7297 85266~|~1~|~2~|~02/NFP~|~Added bike path.~|~10 - Bridge Replacement~|~03AF7886DEC39D4C8A51B2B03C8C9D07B299D816 85266~|~1~|~4~|~04/NFA~|~Plan split for utility conduit - To be paid by utility - Century Link~|~10 - Bridge Replacement~|~645DB932B5217FE52564F7E1E6F1C00FE31A2A72 85266~|~1~|~5~|~05/NFA~|~Plans split for utility conduit - To be paid by utility - Level 3-Fiber Optic~|~10 - Bridge Replacement~|~B69D8961AA8514C438490A9EA0769F50DE6722C6 85266~|~1~|~3~|~03/NFA~|~Plan split for utility conduct. To be paid by the utility - Ameritech~|~10 - Bridge Replacement~|~AAC1D704C6E279634A55F2F9F8BD4FEC9E74B24D 110285~|~1~|~1~|~01/NFA~|~Resurfacing HAS-258 from SLM 0.00 to 3.02 and TUS-258 from SLM 16.55 to 20.90.~|~05 - 4R Maintenance - Resurfacing~|~7A2FAB39773A2434D398696846EA2C80410CCC4F 110285~|~1~|~2~|~02/STR~|~Resurfacing TUS-258 from SLM 20.90 to 21.23.~|~05 - 4R Maintenance - Resurfacing~|~3F512C88C8F0BBDF709C452910890DCE29E3FA31 110285~|~1~|~3~|~03/S<2~|~Resurfacing TUS-800 from SLM 7.83 to 9.13 (US 250).~|~05 - 4R Maintenance - Resurfacing~|~C7963212F7F3239897B20C47C92A3BB4E379C096 104262~|~1~|~1~|~01/STR~|~Bridge repair on FAY-62-22.78 over N Fork Paint Creek. SFN 2401541~|~10 - Bridge Replacement~|~5D3114560BEC30CC869E48E1766DECB3159E0893 123650~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities.~|~47 - Bridge Preventive Maintenance~|~11C649097BF45EB4D8F2110060FF1541AD3E0914 80110~|~1~|~1~|~01/IMS~|~Tentative split for unfunded major rehab work on FRA-71~|~05 - 4R Maintenance - Resurfacing~|~1F0298EF265D5F6228E692AEA72A9C8CE5769E0E 95147~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ "- District Preservation Funding 4PS7 (100% State) - No CAP - District Wide Contract for Annual RPM replacement (3 year cycle)~|~21 - Safety~|~B52B94BC4202547280B078CBF80AA36A3E259B2A 124784~|~1~|~1~|~01/STR~|~Plan split for Conduit Replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~97C4203B37C4BFA662C80ACAD6442819C86A8834 106882~|~1~|~1~|~01/NFP~|~2 year lighting contract in ATB, MAH and TRU Counties.~|~21 - Safety~|~2A16EF50039DAC301EC7955F3EBF6C13EF0C1930 106882~|~1~|~2~|~02/NFP~|~LED luminaire upgrade.~|~21 - Safety~|~EC5FF7CDD7F64C8A5257B093370DADD7D91C906E 102747~|~1~|~1~|~01/IMS~|~This plan split is for bridge rehab on the Interstate route.~|~13 - Bridge Rehabilitation~|~75B79C560E8F1A9A89B6FBCE33E3F8D05D01D2B2 105408~|~1~|~1~|~01/S>2~|~Scour repair on large urban bridge.~|~13 - Bridge Rehabilitation~|~E3546AA6E6B94C0A4B67C0DAF495B8FEE61CA2F4 108918~|~1~|~1~|~01/NFP~|~Repair of structure due to a collision~|~13 - Bridge Rehabilitation~|~6781137C838A7F60106DF38F179BBFF658C019C6 97980~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~B257F80D7CE3336E96045160C2F5B9BDE79F1A55 102911~|~1~|~1~|~01/STR~|~ROS 207 9.32 culvert replacement~|~04 - Reconstruction - No Added Capacity~|~45D9C73A3A235867AEE65932B910A6D1F6E83948 110324~|~1~|~1~|~01/NHS~|~ Replace deck on existing concrete I-beam bridge BEL-7-1152 (SFN 0700223). Project will also replace the bearings and expansion joints. The substructure units will be repaired. The project will also repair the deck and wearing surface of structures BEL-7-1187 (SFN 0700312) and BEL-7-1279 (0700339).~|~13 - Bridge Rehabilitation~|~9A7F797BED0A0D5922634933E1E65636DDD0FF8F 126899~|~1~|~1~|~01/NFP~|~Plan Split for pavement marking throughout the district on roadways with various functional class~|~21 - Safety~|~AAC29DD4025FB99A423852BED93768A28F0A9336 124657~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded scope.~|~21 - Safety~|~578BD1FB91023BFC8148D30D45BD6EDDF105DDAE 123966~|~1~|~1~|~01/IMS~|~emergency drainage structure repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C87352C52D8C19BE09302CA74E953E4EA4CF4A44 89443~|~1~|~1~|~01/IMS~|~Guardrail Maintenance/Repair~|~44 - Other~|~70BC69CB22C44FE3C2828C1CC2873982930E680F 125031~|~1~|~1~|~01/NHS~|~Resurfacing and related road work.~|~05 - 4R Maintenance - Resurfacing~|~F215652B44DB849A86D91FC7D56895586A49E067 100409~|~1~|~1~|~01/NFP~|~Expanding Millennium Blvd SE by 3000 feet.~|~01 - New Construction~|~E552D0C66121C33803AAB9DA85496AE6CE20E6BF 20742~|~1~|~1~|~01/STR~|~Brdg Replacement. 0.04 MI. S OF TR75 (DRY RUN RD) 7302347 SCI SR73 4.28 Intersect: Dry Run80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~9FE4E45C32316CEB2393FB47D22889EC46B5FD4D 93969~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2017~|~21 - Safety~|~4158240D546403FA8EC3F42C293FA022D8D2E7F4 108866~|~1~|~1~|~01/SAF~|~Mill and fill NB I-75 from the 7th St overpass to the Findlay St bridge overpass.~|~21 - Safety~|~F6730E96B1CFA0767107F01C95C81B0F6D40F907 125948~|~1~|~1~|~01/NFP~|~Plan split for annual sign replacement/repair contract using district preservation funding, 100% State~|~21 - Safety~|~76C11CDBEFDDB646DF22C8D7794CB024781ADA17 116144~|~1~|~1~|~01/SAF~|~"01/SAF/PV" - RPM replacement~|~21 - Safety~|~D7014FCDBE77F0196418F28A795D41B7E65135DB 121753~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~1BBF19C15F38CE089DDDA9522B9F861EED27D1CC 110480~|~1~|~1~|~01/SAF~|~Safety funds Plan split~|~21 - Safety~|~BBA2736952028D8FCFAB28D627A179B216A2A3FA 107164~|~1~|~1~|~01/SAF~|~Plan split~|~21 - Safety~|~258D2229600A5147E7206D35B779AE6AE7CAAA76 96290~|~1~|~1~|~01/NHS~|~Bridge (SFN# 7100248) is on Rozelle Creek Rd but is part of US 23 SLM 4.97.~|~44 - Other~|~5362F60378433174085174645ED1B4AB1E7707C5 99450~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% State funds from the District Preservation Program 4PS7.~|~21 - Safety~|~3A53AD1DA7D50F8F03DC7C81146DF942ABB995C7 121547~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~C822D096DDC1BD8511A4E91B041D15429AE6F61E 100377~|~1~|~1~|~01/STR~|~Work on SR 18 in Hancock County from the Wood County line to the Fostoria Urban Area Boundary at TR 262 which is at 6.46. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~1625E07C16A49A59CAA1735784CF947AD926B17E 100377~|~1~|~2~|~02/S<2~|~Work on SR 18 in Hancock from the Fostoria Urban Area Boundary at TR 262 which is at 6.46 to the west City of Fostoria corporation limits at 6.82. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~E96271B33E032A51804E50C5A239D4E98AD76E03 84615~|~1~|~3~|~03/IMS~|~District wide Small Culvert Rehab/Replacement project. Rehabilitate culvert BUT-75-0390 (Pave invert and line portions)~|~04 - Reconstruction - No Added Capacity~|~3EE9C5B7BAEBB14AF5B9F1C1BF34290F8AA70064 84615~|~1~|~2~|~02/NHS~|~District wide Small Culvert Rehab/Replacement project. Rehabilitate culvert BUT-4-1249 (pave invert)~|~04 - Reconstruction - No Added Capacity~|~57EAC219C17D762C47120B3EC8C5A3136482CB09 84615~|~1~|~1~|~01/STR~|~District wide Small Culvert Rehab/Replacement project. Replace culverts BUT-126-0650 and BUT-126-0999. Rehabilitate culverts BUT-126-0920 (pave invert), BUT-127-1681 (new invert) and BUT-127-1810 (pave invert).~|~44 - Other~|~FE540E298C1F2A14EB1DB3002383950C27D60965 114001~|~1~|~1~|~01/SAF~|~Install new/upgrade existing pavement markings on various county roads in Clinton County.~|~21 - Safety~|~6F4CA9EC99DA0990C94C769954D56FDCFA27872C 107128~|~1~|~1~|~01/NHS~|~Urban Paving - City of Cincinnati - Taft to Delta.~|~05 - 4R Maintenance - Resurfacing~|~18E76E40D36F78AA8A2E200C055CD45566A44B20 107128~|~1~|~2~|~02/NHS~|~Items to be covered 100% by the City of Cincinnati.~|~05 - 4R Maintenance - Resurfacing~|~D21B93E2CD7BE5BCFDACACDDCC11AE9027B7C027 92193~|~1~|~1~|~01/STR~|~Includes all work associated with replacing bridge PRE-725-0332.~|~10 - Bridge Replacement~|~27CB3211B95C7504ACB72F20C5E8D3CAF970BD8E 79663~|~1~|~1~|~01/IMS~|~90% federal/10% state resurfacingFRA-70: 11.15-14.2501/IMS/PV/~|~05 - 4R Maintenance - Resurfacing~|~2C4569BB80C63DACE61147099F04EF4C5054A5D2 79663~|~1~|~3~|~03/IMS~|~Pavement Markings & RPMs 100% State~|~05 - 4R Maintenance - Resurfacing~|~6D43FC6DA7F5845EA495060F958FB9F4ABDDF38D 79663~|~1~|~2~|~02/IMS~|~90% federal and 10% state minor workAsphalt overlays:FRA-70-1178 (2504707) SULLIVANTFRA-70-1198 (2504723) US 62FRA-70-1205 (2504731) CSX RRFRA-70-1223 (2504758) MOUND ST RAMPFRA-70-1241 (2504618) GLENWOODFRA-70-1248 (2504634) CYPRESSFRA-70-1282 L/R (2504642/2504669) SOUDERFRA-70-1301 L/R (2504677/2504766) SR315Asphalt overlay & deck patching:FRA-70-1121 (2504588) BROAD STFRA-70-1149 (2504693) STATE SCHOOL ACCESS~|~05 - 4R Maintenance - Resurfacing~|~6E646EEF4A88B919A73D0908E10FB1D037BCBEB2 116296~|~1~|~1~|~01/STR~|~Chipseal project.~|~05 - 4R Maintenance - Resurfacing~|~9918EF1AEAC7766FB0C92E6CF0B20C220DD5C1CF 105818~|~1~|~1~|~01/IMS~|~Split for painting interstate bridges~|~47 - Bridge Preventive Maintenance~|~A69BF2595925619ECAB8C0C2064E4F851517173C 105818~|~1~|~2~|~02/NHS~|~Split for painting NHS bridges~|~47 - Bridge Preventive Maintenance~|~932ABAF542F7DD09FDB4F6A4AFE63D0B6452D43D 98596~|~1~|~1~|~01/S<2~|~Slide at OTT-2-18.40 WB.~|~21 - Safety~|~320661918EB5E9999BF34487970CDD95168B5BA4 95512~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-SR 79-06.21 to 11.47~|~05 - 4R Maintenance - Resurfacing~|~8BEE003EEF36455849231EDA70CA13821FD5F5BF 93223~|~1~|~1~|~01/STR~|~Culvert replacement project. HOC 180 10.98. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~9860948CC30BEC14E7B3D709A9AE49AEF525AE14 117605~|~1~|~1~|~01/NFA~|~Bridge replacement project .MEG TR 126 0.579, SFN 5342600. Funded 100% Federal.~|~10 - Bridge Replacement~|~C4D28A27450B92153F19740DAA68707711F5C6F1 96969~|~1~|~1~|~01/IMS~|~Spot paving on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~E885954C122E79CCCD7A0D41035620A22C842BD7 115072~|~1~|~1~|~01/ENH~|~Created for J&C Involvement~|~44 - Other~|~625351031461C9096B443D0142FBA6C786DBC038 107168~|~1~|~1~|~01/SAF~|~Plan split~|~21 - Safety~|~5E5BD8334633A5CDB0CBD15C70F7408D6EA5448D 122826~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAC 4CD7). Construction phase cap is $1,492,405 and requires a 20% match (TRC)~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~2190B9215C2DA80544265F2641AA360A12893E7C 97125~|~1~|~1~|~01/SAF~|~Plan split for all lighting maintenance work in the project~|~~|~6A816ED44802B022E7785F17294C4102DD0BBF32 120033~|~1~|~1~|~01/STR~|~Superstructure replacement~|~13 - Bridge Rehabilitation~|~938D064A793810A6866300A9FA2A4CE0ADD741A2 121123~|~1~|~1~|~01/STR~|~Added bridge plan split.~|~10 - Bridge Replacement~|~080A8751C8B1B47AFBE7D74111AEA64AD7841C08 122285~|~1~|~1~|~01/NHS~|~Plan Split for work associated with the installation of dynamic message signing and queue warning systems with TSMO funding~|~21 - Safety~|~BD0E9D8BC0B353C40EA93C2110C02DAA8225FE5E 114233~|~1~|~1~|~01/NHS~|~Bridge repair from vehicle strike.~|~13 - Bridge Rehabilitation~|~93540B37AE91D30149FDBE2F9836D95F15E10881 118771~|~1~|~1~|~01/NHS~|~added plan split. ~|~05 - 4R Maintenance - Resurfacing~|~68ACF4ACC7298783F95DF863F5E668845F239912 118771~|~1~|~2~|~02/NHS~|~added plan split for bridges. funded by major bridge.~|~13 - Bridge Rehabilitation~|~120DEF5A22672F4D9F218791F2D4552C9D842FD9 118771~|~1~|~3~|~03/NHS~|~added plan split for non major bridge ~|~13 - Bridge Rehabilitation~|~1DFCCE907EFBE0CF128B263B4F09B149AE330EA6 107311~|~1~|~1~|~01/NFA~|~The City will completely reconstruct and widen Hoyle Ave from Kettering Ave to Dixie Highway~|~01 - New Construction~|~75C6F77A13E3B112F93B93DE7612DA36F05AADF0 124399~|~1~|~1~|~01/STR~|~Plan split for resurfacing of SAN-19 between SLM 0.696 to SLM 4.432~|~05 - 4R Maintenance - Resurfacing~|~E008958669A8BCF34DAD04335576C8216E79691A 124399~|~1~|~2~|~02/S5K~|~Plan split for resurfacing work on SAN-19 between SLM 4.432 to SLM 5.286~|~05 - 4R Maintenance - Resurfacing~|~5D25E097F062955C79856F70DFA59892FEF7C120 123664~|~1~|~1~|~01/NFP~|~annual culvert FY32~|~21 - Safety~|~105EC02F1C699752F8CE79C46461D2039279B0EF 112122~|~1~|~1~|~01/IMS~|~Demolition of 5 buildings.~|~44 - Other~|~8A33829D2990556156D9D65B6EB9A2AA35B225E7 104775~|~1~|~1~|~01/STR~|~Resurface on County rural road.~|~05 - 4R Maintenance - Resurfacing~|~1F304E8EF3501052DE10BCECE8D1CCABFCFCF398 87297~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 133 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~32F82AAE905F7DC3D82250A5D1BDF85405727A44 96200~|~1~|~1~|~01/NFA~|~Application of 1.5 inches of asphalt overlay, installation of a 3 inch topsoil berm against new pavement with seed, fertilizer, and mulch, application of thermoplastic pavement markings with silica sand for skid resistance, and full depth pavement repairs where needed.~|~28 - Facilities for Pedestrians & Bicycles~|~A8D074CD14917AE2498BC76423F73434920E1EBE 126406~|~1~|~1~|~01/NHS~|~Plan split for the items that are Urban Paving eligible; 80/20 split between ODOT and the City. ~|~05 - 4R Maintenance - Resurfacing~|~13CAD25C74029BAB06BE7BB15A69CF1465046335 126406~|~1~|~2~|~02/NHS~|~Plan Split for the 100% City funded items. ~|~05 - 4R Maintenance - Resurfacing~|~4723CDBAA0531D4837214B1AB67B8B8BE689AD91 123903~|~1~|~1~|~01/SAF~|~Plan split for safety eligible construction items.~|~21 - Safety~|~C29FF78242BD8C17AF4068FE3087BA606453D407 111767~|~1~|~1~|~01/S<2~|~AC overlay without repairs on:SR 47 SLM 20.95 to 21.06~|~05 - 4R Maintenance - Resurfacing~|~11B92573CB02EB91DA8CAB330325895481121AD1 111767~|~1~|~2~|~02/STR~|~AC overlay without repairs on:SR 47 SLM 21.06 to 27.09~|~05 - 4R Maintenance - Resurfacing~|~51F8BACC95A8D1F8584539C5AA30DCF992A706A6 94451~|~1~|~1~|~01/BRF/CCEO~|~01/BRF/BR/CCEO" - County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP = $355,000.00 Federal (4B87) dollars @ 80% - Replacement of SFN 1631454 COS CR493 0.10 Intersect: Structure Creek; BR Eligible for Replacement: Length=50 SD/FO(1) SR=13.7 DSR=4~|~10 - Bridge Replacement~|~5B5E809B411235E558F43B640BC582BC52A1BAAC 106160~|~1~|~1~|~01/STR~|~Landslide repair. MRG 669 17.23. DSR MRG-009. Rural other federal aid funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8ADB619F4042652C41239E19992C2FA824FE3140 91156~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2017 herbicidal spraying.~|~44 - Other~|~1201556DE91FCF3AC1AAFAFBBAB52A181FBC35A3 116294~|~1~|~1~|~01/S<2~|~Chip Seal~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A85817DF3EEE6B956230DE25E63E8F3A1CFCDFD2 116294~|~2~|~2~|~02/STR~|~Chip Seal~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~970E7FB5A5C814F73E9A9A1FCFB597328E6EA5D3 95361~|~1~|~1~|~01/NHS~|~Split for work on the Lorain Rd bridge: 1801325. To be funded at 100% state.~|~13 - Bridge Rehabilitation~|~04908FE98ABD7F0C3F2D42AF263C8784BEBB19BD 95361~|~1~|~2~|~02/BRO~|~Split for the Granger Rd bridge: 1802496. Work to be funded at 100% state.~|~13 - Bridge Rehabilitation~|~9C67E54B02B5319E43E759F7E820C665969B0646 117498~|~1~|~1~|~01/BRF/CCEO~|~Replacement of the existing superstructure. Upgrades to guardrail on bridge approaches.~|~10 - Bridge Replacement~|~4A7617993D3BF7DC7394D5BBE448EF35EB2F6053 99779~|~1~|~1~|~01/SAF~|~Intersection of SR4/US40/US68 at CR327 - realign and widen the US68 Southbound exit ramp H; Signalize the intersection of US68 Southbound exit ramp H and CR327; and widen the US40 and CR327 intersection to provide the required auxiliary lanes and change lane use assignments for optimum signal operations.~|~21 - Safety~|~A9561634001D7DBDC13B42423E91930842DF14D3 102936~|~1~|~2~|~02/STR~|~STP Rural AC Overlay without Repair (WAY-3-20.16 to 25.74)~|~05 - 4R Maintenance - Resurfacing~|~80A30739512DA72566C7D27518CE520B6FFA069C 102936~|~1~|~1~|~01/S<2~|~STP < 200000 AC Overlay without Repair (WAY-3-19.62 to 20.16 / 25.74 to 26.13)~|~05 - 4R Maintenance - Resurfacing~|~2696CF2E29661BD41848397628E578E6BA305B28 112960~|~1~|~1~|~01/STR~|~FAY-22 from 0.00 to 6.26~|~05 - 4R Maintenance - Resurfacing~|~382711892A14FFF42BAD09791191D52F05F6CA39 121833~|~1~|~1~|~01/CMQ~|~Plan Split for MPO funded CMAQ funds~|~21 - Safety~|~3E49DB5074E6A3EA75F44CDF908AA90016E28AB2 100990~|~1~|~1~|~01/NHS~|~AC Overlay with Repairs on US 35 SLM 15.07 to 18.59~|~~|~E883A58DF93281643BEFAC08E717746413257D7B 120459~|~1~|~1~|~01/BRF~|~All work in the project to replace the bridge ~|~10 - Bridge Replacement~|~F47828BF29FD76C0E6EEB3593BB84D599ED8BFB1 117973~|~1~|~1~|~01/STR~|~Landslide repair project. MOE SR 78 8.30. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C86EA2C055D71B3FB4ED8EE93666A615CF3A3C15 125045~|~1~|~1~|~01/NFA~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C785C3512DE1D3D17140017E0A65D6D69C5B7BA0 100748~|~1~|~1~|~01/STR~|~ER landslide repair on JEF-213~|~44 - Other~|~6B50F644828754FA5E91A7A02ED0BAC2B9E6747E 90794~|~1~|~1~|~01/S>2~|~Demolition of the existing bridge and construction of a new bridge with five 12' lanes and two 10' sidewalks, including ADA compliant wheelchair ramps. Webster Street Bridge over the Mad River.~|~10 - Bridge Replacement~|~DCE4B6C494C8A5D64EC3D3EAB3A69B14A777E593 109214~|~1~|~1~|~01/STR~|~2018 Operations Chip D1~|~05 - 4R Maintenance - Resurfacing~|~73A7845ED8014690006671D4927953A086A52257 102840~|~1~|~1~|~01/S>2~|~This plan split is for signal work in urban area.~|~21 - Safety~|~ED074F7E5C82974325E958169D0C0DAFD11A2249 102840~|~1~|~2~|~02/S>2~|~Preemption to be paid at the City's expense.~|~21 - Safety~|~95EA9A36103902152A9E4E6FB115E7D9B52EFA7A 122410~|~1~|~1~|~01/S>2~|~Lighting upgrades~|~21 - Safety~|~2C60C2378FB6E27E322A463354AC28FF18CA2F9F 111621~|~1~|~1~|~01/STR~|~Intersection upgrade at SR 158 and Coonpath Road.~|~21 - Safety~|~1A89B6D1A4C8FFD739FA9404A5B496AB0EDE807C 84621~|~1~|~2~|~02/ENH/TCE~|~Plan Split for scenic beautification and landscaping items for sfn# 7804136 over Walnut Creek in the City of Cortland, Trumbull County, Ohio.~|~31 - Landscaping & Other Scenic Beautification~|~26325E2C2F12D4DB71B6B64DC1B5F63A9F8A0952 84621~|~1~|~1~|~01/BRO/TCE~|~Replacement and SFN# 7804136 over walnut creek, in the City of Cortland, Trumbull County, Ohio.~|~03 - Reconstruction - Added Capacity~|~7C679025F800D2E6DA0837BEE194B5F00B9B360D 98980~|~1~|~1~|~01/MPO~|~Resurfacing W Federal from Phelps St to Market St, E Federal St from Market St to Walnut St, and Commerce St from 5th Ave to Federal St.~|~05 - 4R Maintenance - Resurfacing~|~4D60D902FF63D25F9E16087BEA8156B9EF638F98 123748~|~1~|~1~|~01/STR~|~Plan Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~459EAC9484CC64BFCCA6E8D11DAC13DFB232672F 99336~|~1~|~1~|~01/NHS~|~Installation of median turns to improve access to Fabens Park.~|~21 - Safety~|~3B484D0A258D929078B44CC32B030ED3999DB537 92838~|~1~|~1~|~01/NFP~|~Culvert replacements on various routes in Mahoning County, Ohio. CFN 500450040 MAH-45-1.997, CFN 50045230 MAH-45-6.483, CFN 500460260 MAH-46-6.115, CFN 501640220 MAH-164-6.659, CFN 505340310 MAH-534-7.625, CFN 502240150 MAH-224-7.041~|~44 - Other~|~2550158EC68BCBD6AD09FE27A20974B3F62991FA 103138~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY30 Construction Engineering Services~|~17 - Construction Engineering~|~2E5D2BB27A07164822E5A488ED01A35733489A6D 103138~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY31 Construction Engineering Services~|~17 - Construction Engineering~|~B7E954C060EFEBBFD84EEDEC73D64B71D499BA13 117201~|~1~|~1~|~01/S5K~|~Installation of sidewalks~|~21 - Safety~|~968BEE4CC59FEE57BB4A0814AA7F3CF7C255CC93 110244~|~1~|~1~|~01/NFP~|~Construction of new local road.~|~01 - New Construction~|~9523C57587B9137FFCD04B8C0ACFD793654022D7 117126~|~1~|~1~|~01/S>2~|~This plan split includes all work associated with widening North Fairfield to provide five lanes~|~04 - Reconstruction - No Added Capacity~|~87EA555B2F1A9B4FFBC7632644E2A27F073FF4C3 117126~|~1~|~2~|~02/S>2~|~This split includes all work associated with constructing the sidepath on this project~|~28 - Facilities for Pedestrians & Bicycles~|~CE1028E03D67703E59259AF7662A6CE512CF356E 90434~|~1~|~3~|~03/S<2~|~50% City of Wooster / 50% District Allocation Items~|~05 - 4R Maintenance - Resurfacing~|~295E35BBC05A58632A41055D00E0CEC9865ECCC4 90434~|~1~|~1~|~01/S<2~|~Pavement Rehab "Urban" - 80/20 - District Allocation/City of Wooster~|~05 - 4R Maintenance - Resurfacing~|~348CBA593CD61FFE2C43DA41C25C900737B6F80D 90434~|~1~|~2~|~02/S<2~|~Priority System Pavement within city of Wooster. No Local participation~|~05 - 4R Maintenance - Resurfacing~|~58F6D3AA335BBA18EA842B37D6E1C1A340DE7EB5 90434~|~1~|~4~|~04/S<2~|~100% City of Wooster / Curb Ramps~|~05 - 4R Maintenance - Resurfacing~|~BB586970C2E6C313FFCD914EA9F7169857531D97 108774~|~1~|~1~|~01/S<2~|~Tunnel repairs, trailhead, and trail work.~|~28 - Facilities for Pedestrians & Bicycles~|~A69D23C0143ABEBAD3F0BDCD195728C7FBCDB2AC 108774~|~2~|~2~|~02/BRO~|~Trestle bridge work.~|~28 - Facilities for Pedestrians & Bicycles~|~A975C60108F77014017024EA3ED06536CA4BB192 98918~|~1~|~1~|~01/NFP~|~Bradner preserve~|~01 - New Construction~|~86FBE66FD0D08AC99E039A47D76B2CCAFAFA05ED 106785~|~1~|~1~|~01/S>2~|~Work to repair/resurface Scranton Road from Sackett Rd to Fairfield Ave that is eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~AB3181094D607A467EF422DE5AD3E9F0B4ECB0EC 106785~|~1~|~2~|~02/NFP~|~Work to repair/resurface Scranton Road from Sackett Rd to Fairfield Ave that is not eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~7125783323832F5D438CACE67790EED1D684BCE2 123011~|~1~|~1~|~01/NHS~|~Districtwide signal installation and repairs.~|~21 - Safety~|~3D42A96B339F26CB57EBB9E1D65921359325B380 105299~|~1~|~1~|~01/STR~|~Herbicidal Spraying for CAR, COL, HOL, and TUS~|~44 - Other~|~EBD449F81FF35FE6F02196F964B49F3CB0F4BC64 109910~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3237D79EAB7028B0B39132295EC4A8F78045D3A6 109910~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3CF36B927C56066E36FC6006CD1AEE55235FF04A 113818~|~1~|~1~|~01/NFA~|~Bridge rehab to include replacement of prestressed beams and concrete rehab of abutment and piers. Replace guardrail and pave approaches. All work will be in the existing right of way and out of the water.~|~13 - Bridge Rehabilitation~|~F389F1974DE9746F7B187BB5C6D2814E4F58F239 110361~|~1~|~1~|~01/MPO~|~Resurfacing of Sunnyside Road beginning 350' north of Jerusalem Rd and ending 800' north of the Norfolk/Southern grade crossing.~|~05 - 4R Maintenance - Resurfacing~|~EC4E54C47CB0B219EB25178042A144929334D5BD 100418~|~1~|~1~|~01/NFA~|~Extension the existing Fieldstone Way, 650 feet west, maintaining existing roadway witdith and termination with a cul-de-sac at the Stonequarry Crossing Project~|~03 - Reconstruction - Added Capacity~|~07BC570250AD67ADD8FF61DEE1553C19DE095553 114684~|~1~|~1~|~01/S5K~|~Double Application Microsurfacing on various sections of CRA-19, WAY-3, and WAY-585~|~05 - 4R Maintenance - Resurfacing~|~A8DE1133BEDC433EF0CD3ECD261EC9A5FFD8F553 114684~|~1~|~2~|~02/STR~|~Double Application Microsurfacing on CRA-19 and WAY-585~|~05 - 4R Maintenance - Resurfacing~|~3463DC35B62B6A32ADA3D105F5C640F1B9D9CDDB 88832~|~1~|~1~|~01/NHS~|~01/NHS/PV/ - District Preservation 4PF7 (80% federal NHS) / 4PS7 (20% state) - No cap - Resurfacing on US23 from slm 15.91 to 23.16.~|~05 - 4R Maintenance - Resurfacing~|~DE2798BE787E94E256B91C3D35F7ED4086DA6EE9 88832~|~1~|~2~|~02/BRO~|~Bridge repair. Federal and state funds from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~823D123ACB198AFA80A0CE2145A3409E6DBFD1FF 118811~|~1~|~1~|~01/S50~|~Additional parking/bike line construction. ~|~28 - Facilities for Pedestrians & Bicycles~|~938BE499C3B6378436BC6B5295DA6DF8EA8FCF70 118811~|~1~|~2~|~02/S50~|~Urban paving work including surface/intermediate asphalt courses and standard pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~4986C2D6F100365832F66BA1C42980F2479229A6 97017~|~1~|~1~|~01/NFP~|~Raised Pavement Markers.~|~44 - Other~|~E247CB6EC60AEB42FAB5EF92A45F05CF43338ED7 85687~|~1~|~1~|~01/STR~|~Structure ReplacementSFN 6501567, PIC-56-31.57 over Salt Creek01/STR/BR/~|~10 - Bridge Replacement~|~C2383855CC7CC1FFE74688E217587BCD2405B8E6 87042~|~1~|~1~|~01/NHS~|~priority system resurfacing includes pavement repairs, guardrail and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~97F73DC3CDCC5ABCC87F38587FC6AA2498FBAF88 102336~|~1~|~1~|~01/STR~|~Microsurfacing BEL-149 from SLM 24.44 to 30.85.~|~05 - 4R Maintenance - Resurfacing~|~D90C566FD2A4F8BD4ECCC3DF2E141D8E6114ABEB 89478~|~1~|~1~|~01/S<2/NEWA~|~"01/S<2/PV/NEWA" - Local Funding LCATS 4TB7 (80% Federal) /City of Newark 4BG7 (20% Local) - CAP 4TB7 of $500,000.00 Federal; Safety CAP $182,500.00 4HJ7 (90% federal requiring 10% Local 4BG7 Match - All funding for Construction Phase only. City of Newark project to improve turn lanes, widen radius of roadway, upgrade traffic signal, replace sidewalk & curb ramps, repair and resurface pavement at the intersection of 30th Street and Church Street.~|~21 - Safety~|~407FEDA5FCCDE7054779E50172ECAC0A72DA1D4C 114172~|~1~|~1~|~01/NHS~|~Repair/rehabilitate bridge HAS-9-1778 (SFN 3400395) carrying SR 9 over Conotton Creek.~|~13 - Bridge Rehabilitation~|~B5142CF9A502A058E9AB2717004E550D8D8945A7 87732~|~1~|~3~|~03/S<2~|~Repair of precast box beam bridge joints along with asphalt overlay and waterproofing on SFN 5710103 MOT 725 5.79 on Tributary of Twin Creek.~|~13 - Bridge Rehabilitation~|~1E2F1857178A4ED93C765A5F3CA0DBB369447501 87732~|~1~|~2~|~02/S<2~|~Resurfacing of the existing Roadway with asphalt concrete on SR 725 from straight line mileage 3.81 to 6.76. Segment length 2.95 = 6.78 total lane miles.~|~05 - 4R Maintenance - Resurfacing~|~26DDAA5585D457E965CD79ED4DC47FAC305A09CF 87732~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete on SR 725 from straight line mileage 0.00 to 3.81 segment length = 3.81 total lane miles = 7.62~|~05 - 4R Maintenance - Resurfacing~|~BCC4D55F0BE26EDE677BE073042CEB5B7F25E7A3 84286~|~1~|~1~|~01/S>2~|~80/10/10 fed/state/local funding split for work that is eligible for Urban Paving funds as modified by the District.~|~05 - 4R Maintenance - Resurfacing~|~40995CF0B382DE0D29AF3EA8DE25945E78A86251 84286~|~1~|~2~|~02/S>2~|~Split for non-urban paving eligible items other than curb ramps funded with 100% OPWC money.~|~05 - 4R Maintenance - Resurfacing~|~E57BF45F89C5BFE5281083EC9BF293188B253C6B 97945~|~1~|~1~|~01/STR~|~SR508 (OC 000) SLM 1.29 to SLM 9.46 resurface the existing roadway with asphalt concrete (2.00 in).~|~05 - 4R Maintenance - Resurfacing~|~08D37099918BBAE8A833CA338BD2A534F80295DE 104612~|~1~|~1~|~01/MPO~|~Rehab of two structures in the City of Warren.~|~13 - Bridge Rehabilitation~|~5E6CEA3C0BB9316164A3424FCF20A6192A25BB69 101335~|~1~|~1~|~01/NHS~|~Plan split for all work associated with WOO-23-2083 bridge replacement~|~10 - Bridge Replacement~|~49C27A389434FF6BCE3DC107634A56B6E92554EA 108454~|~1~|~1~|~01/MPO~|~Resurfacing of Olde Eight Rd from Boston Heights North Corp Limit to Highland Rd (south intersection).~|~05 - 4R Maintenance - Resurfacing~|~B96807E7D48D69CFC19D4349B3285B3231D50E1A 108454~|~1~|~2~|~02/S>2~|~100% county items for roadway widening.~|~05 - 4R Maintenance - Resurfacing~|~76B5C6947C42E057B91756F7051B179B3179E777 123849~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~116D563B09656D500366E0CB15C990B986C080CA 110568~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funds - 4PF7 (90% Federal ) / 4PS7 (10% State ) - No CAP - Installation of culvert liners on IR 70 in portions of Licking and Muskingum Counties~|~04 - Reconstruction - No Added Capacity~|~B3779D4962FE1393B21FAF21C872693ADA113B16 91350~|~1~|~1~|~01/BRO~|~Bridge replacemnt of SFN 7800274 West Market Street (6.88)~|~10 - Bridge Replacement~|~57575A6A74630C9D393B9ED48209752A17264616 91350~|~1~|~2~|~02/NHS~|~Bridge rehabilitation for SFN 7800541 Eagle Creek Road and SFN 7800398 North Leavitt Road over SR5~|~13 - Bridge Rehabilitation~|~7C633CBE7FFDE13442D5FED35A9450C90381C1F2 97154~|~1~|~1~|~01/S>2~|~Stark County Engineer~|~05 - 4R Maintenance - Resurfacing~|~A49B10C29E262AEE13E036BA96C8C01251483363 122987~|~1~|~1~|~01/MPO~|~Construction of Sidewalk at SR48 and Butterworth~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~259391FD055409A2E68B4A30AC42F249471D679F 109736~|~1~|~2~|~02/NHS~|~plan split for the section of SR 32 in the project that is NHS~|~05 - 4R Maintenance - Resurfacing~|~FED51F72BD0E527FA0AB56271398C6C66FD38A84 109736~|~1~|~1~|~01/S>2~|~plan split for the large urban sections of SR 32~|~05 - 4R Maintenance - Resurfacing~|~10E0EF570E87CC78900E87465C377B14A6C97449 126997~|~1~|~1~|~01/SAE~|~Convert two-way stop-controlled intersection into single-lane roundabout at SR 301 and Parsons Road (CR 15) ~|~21 - Safety~|~2358FF3289DE3E7502B8D6D0762DE0877F13E105 95128~|~1~|~1~|~01/NFP~|~District wide herbicidal spray project.~|~44 - Other~|~C2589E0A99581434CF11894817839C457CF96CA7 88929~|~1~|~1~|~01/NHS/YOU1~|~Resurfacing US 422 from 5.32 to 7.10, split corp, this half in the City of Youngstown, 80/20 split.~|~05 - 4R Maintenance - Resurfacing~|~D70BA7310F33EC11B7F90648A13258BD7385C891 88929~|~1~|~3~|~03/NHS/CAMP~|~Resurfacing US 422 from 5.32 to 7.10, split corp, this half in the City of Campbell, 80/20 split.~|~05 - 4R Maintenance - Resurfacing~|~C54C28FF22598FB26BA411D5FF22C8C820E0CDBF 88929~|~1~|~2~|~02/NHS/YOU2~|~Resurfacing US 422 from 5.06 to 5.32 and 7.10 to 7.58, entirely in the City of Youngstown, 80/20 split.~|~05 - 4R Maintenance - Resurfacing~|~BA2215A284BFFBA35186DCB6B614273115FA1978 109441~|~1~|~1~|~01/S>2~|~Roadway improvements to include resurfacing, new storm sewer and minor bridge rehab.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A4515546329AF39F524E8E6571C69D85A251508 109441~|~1~|~2~|~02/CMQ~|~Construct left turn lane.~|~21 - Safety~|~9FC9B23C064E85EF856DDAC9DD2070707CC3AA38 109441~|~1~|~3~|~03/SAF~|~100% Local split~|~21 - Safety~|~910664B8562B3B54FB509860E487B59EF7C26F9D 110123~|~1~|~1~|~01/S>2~|~Urban Paving plan split~|~05 - 4R Maintenance - Resurfacing~|~2D737B9D10F1642F5103AB62111AA7C1A2009436 123686~|~1~|~1~|~01/IMS~|~plan split for interstate locations~|~47 - Bridge Preventive Maintenance~|~1B25C9D603DB103F229A7A01633CC366BE5C9770 99591~|~1~|~1~|~01/SAE~|~Upgrade pavement markings on various Richland County roads.~|~21 - Safety~|~E71126C82674031557D1C01A26DC4B1019106C3A 8743~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds. 1800450; CUY-006-0257~|~10 - Bridge Replacement~|~4514281815CF1E1C18541BB810E437C4B1C1FD1B 119885~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-D~|~63 - Electric Vehicles & Charging Infrastructure~|~40DC31F2B439F84911EA7609116F1750B1C46FAD 110973~|~1~|~1~|~01/NFP~|~Rehabilitation of Bridge WAR-TR 52-0402 (SFN: 8334773) by replacing the existing superstructure with a new prestressed composite concrete box beam superstructure and performing minor substructure repairs.~|~13 - Bridge Rehabilitation~|~53F060EA79E0BBBD225B8F8072D4C2BB9FF5B25A 117327~|~1~|~1~|~01/NFA/LCEO~|~Replacement of structure (SFN 4530365) carrying Wolford Road over Rocky Fork~|~10 - Bridge Replacement~|~56EDFC8CE161790E62E54AC74A3A2472307C0D2E 106230~|~1~|~1~|~01/CMQ~|~Construction of Southbound left turn lane along SR-170 at Dobbins Road, in Poland Township, Mahoning County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~89FD1911E5EA4DC6DE5F5B7A5377572F32204F5B 106230~|~1~|~2~|~02/BRO~|~Concrete overlay of MAH SR170 8.02 structure. SFN# 5004020.~|~13 - Bridge Rehabilitation~|~C99E4ADB8CD50C3F4E873BDD9686306D32FB8EC2 100591~|~1~|~1~|~01/STR~|~Resurfacing CAR-39 from TUS Co. Line to Dellroy SCL and Carrollton to SR 524 including fine graded polymer asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~661CE5260DBB9E7A6E83120D2DDF55239AC32DE5 107057~|~1~|~2~|~02/STR~|~Bridge rehab on NOB SR 83 0.03 (SFN 6101445).~|~13 - Bridge Rehabilitation~|~D1C2179955FB2B786E09602F3816B4A10AE4875B 107057~|~1~|~1~|~01/STR~|~Bridge replacement project on NOB SR 78 1.09 (SFN 6101054). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~F30347A921974E9CA169E61BEC270530C1AB9B3A 94717~|~1~|~2~|~02/SAF~|~construction engineering for left turn lane from foster maineville to butterworth and improved sight distance exiting butterworth.~|~17 - Construction Engineering~|~C80AD450211B937370EE114C27914358B0AB65B5 94717~|~1~|~1~|~01/SAF~|~add left turn lane on foster maineville road to butterworth road and improved sight distance exiting butterworth road~|~21 - Safety~|~E14944498A60A70CB488E90DE764B4529FB2560F 126675~|~1~|~1~|~01/S5K~|~FAY 22 0948 bridge replacement~|~10 - Bridge Replacement~|~D3C5C5661D1250E4AA59D0522031CF00190B00D3 123051~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~B4D8068B3C81D950E984522E17427CC5429BB351 124607~|~1~|~1~|~01/S5K~|~Rehabilition of SFN3000575.~|~13 - Bridge Rehabilitation~|~80EF256C57E09A9DB152A268AC3DB859B970E63B 117072~|~1~|~1~|~01/STR~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~4BCAFF49991193E60F14A6818737FB47748662CB 124894~|~1~|~1~|~01/IMS~|~Plan Split for slope and drainage repair on interstate.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C32F73AA8ADCA444D2C3905078727E8620AAD43 114900~|~1~|~1~|~01/S<2~|~Resurfacing.~|~~|~3B8FD6C9ED1479A388D01CD6950DDEB1FCAFD409 114900~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~2BC12B0D024E5B8DF985B3041EF5C242498CD93A 101798~|~1~|~1~|~01/NHS~|~Replacing linked structure > 20' span.~|~10 - Bridge Replacement~|~B3C2D6DD6844BED0A2F656CC7B202E140996A761 101798~|~1~|~2~|~02/STR~|~Superstructure replacement of linked structure > 20' span.~|~10 - Bridge Replacement~|~B77C14DE831A7A0AC809243EC6FCF592D500C86C 94065~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR 85 W 3.80, SFN 5832896. Funded through the Ohio Bridge Partnership Program 100% federal.~|~10 - Bridge Replacement~|~3F6AC1A7FD6E63974DB6682D6995D89DDF334A49 122011~|~1~|~1~|~01/STR~|~Road widening~|~21 - Safety~|~02CD90E60C33FCC0568C17320107678EBB142AC9 100827~|~1~|~2~|~02/NHS~|~Funding split to rehab the WAR-73-1458 bridge that carries SR 73 over the Little Miami River.~|~13 - Bridge Rehabilitation~|~7528A03D146A33E8588B5552B818C6F3803E096E 100827~|~1~|~1~|~01/NHS~|~Replace Bridge WAR-73-1462 over Corwin Nixon Rd and the Little Miami River Bikepath.~|~10 - Bridge Replacement~|~D8744C92CE0F71D744F1EA99BADABA4741CBD37E 108486~|~1~|~1~|~01/IMS~|~Tree clearing on Interstate routes~|~44 - Other~|~4FC86A70D76F86B35562B3338AAD4BCF835C649A 108486~|~1~|~2~|~02/NHS~|~Tree clearing on NHS routes~|~44 - Other~|~6A359D98C70667C26471DFD7AC9FE1353D5BF615 108486~|~1~|~3~|~03/S>2~|~Tree clearing on STP routes~|~44 - Other~|~7CEF4E88B84C62B87AF7102DEB3418DD7FC618B1 108486~|~1~|~4~|~04/STR~|~Tree clearing on STP Rural routes~|~44 - Other~|~8B37DBEFA5B88ACB023DFB1131AF816EAB799504 121082~|~1~|~1~|~01/NFA~|~PM (A) plan split.~|~21 - Safety~|~24C22EA8A7D11C67A6B4B280C428E96B8CB92238 103892~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 4.46. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~73C31F02165770B2A7569BBA0D65AF2086CA77D1 114253~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 33 18.48-18.68.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~50EC76F500808D31A7C572E041F41F82411E7E2F 122131~|~1~|~1~|~01/SAF/FCEO~|~Safety funded construction of a roundabout at the intersection of Williams Rd and Spangler Rd.~|~21 - Safety~|~A463FC1CCDDBBC3A60F39A326FBE65575464B1A2 124524~|~1~|~1~|~01/IMS~|~Replace structures~|~10 - Bridge Replacement~|~A3B44727BD1DF2AAC634FE42147448E68FB03857 91092~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~A72E6FD94D90D26417B11769BC358A47F95A2527 91092~|~1~|~3~|~03/IMS~|~See work locations for specific bridge work.~|~13 - Bridge Rehabilitation~|~E4B9920C6B3AAA3A366DA1D0306B04F169A2A458 91092~|~1~|~2~|~02/NHS~|~MED-224-15.61 to 16.36~|~05 - 4R Maintenance - Resurfacing~|~D34E4BEB775657BDE8B83FD9682A99140D93B182 95767~|~1~|~1~|~01/NHS~|~SAN-6 from SLM 6.78 to 12.99~|~05 - 4R Maintenance - Resurfacing~|~05A2C28C0131896CE7FBF1A4E3A4C80391985898 91301~|~1~|~1~|~01/NHS~|~Slide Repair~|~44 - Other~|~93B2D6FA2250D656A5CFECB7F03C5A33CC1C1EE9 108930~|~1~|~1~|~01/SAF/CAMB~|~City of Cambridge SRTS Funding - 4SC7 (80 Federal) / LNTP (20% TRC) - Replacement of sidewalks, curb ramps, and crosswalks.~|~21 - Safety~|~E051783EB853B42E12CD7C87C3F7C94E91179278 112036~|~1~|~1~|~01/MPO~|~Multi-use path on Olentangy Trail from Northmoor to Clinton Como.~|~28 - Facilities for Pedestrians & Bicycles~|~CBA2BE4D6CA97AC7E6623AFFD6E06986F3728776 114922~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~50A9EC799EF59B5FC0BCFDE13E15E155BD5651BD 100859~|~1~|~2~|~02/S<2~|~HIG 50 11.50-11.85~|~~|~AC41D9E4F92E26069294A97BD1F39C17B74FE5F5 100859~|~1~|~3~|~03/NHS~|~HIG 50 11.85-12.27~|~~|~992F2C8E50E2EECA8FCA7B40332F19C2399AC0FC 100859~|~1~|~1~|~01/NFA~|~D09 GAP FY22~|~05 - 4R Maintenance - Resurfacing~|~352603EE56BAB6AE5854AE17F946E981AD07B876 100684~|~1~|~1~|~01/STR~|~Microsurfacing TUS-800 from SLM 30.54 to SLM 34.91~|~05 - 4R Maintenance - Resurfacing~|~7F95D9B68FB1442C3EB16257B7497C7E6E367B02 114895~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~A4E46F286A60B2DD9345B94FBBC0AD22C15DA083 126917~|~1~|~1~|~01/S>2~|~Plan split for federally eligible construction items for Municipal Bridge funding.~|~10 - Bridge Replacement~|~45A4EAA34A97659FA62C3B34B078D664EBE505AF 89404~|~1~|~1~|~01/SAF~|~Project involves improving the intersection of Bramble Ave and Plainville Rd from an existing four leg offset signalized intersection with 2-4 lanes of traffic in each direction to a single lane roundabout with single lane approaches and departures. Improvements include new pavement, curb and gutter, storm sewers, sidewalks, and utility relocation.~|~~|~28AF5A28E4B502D5F0343B390491C56392B1C4BF 102869~|~1~|~1~|~01/S<2~|~Plan Split for STP<200000, Marion, MAR-423~|~05 - 4R Maintenance - Resurfacing~|~F10EB1B8B08302C4D34EEAB2F3F3808E499D6457 102869~|~1~|~2~|~02/STR~|~Plan Split for STP Rural, MAD-40, MRW-19, MRW-61, PIC-762~|~05 - 4R Maintenance - Resurfacing~|~37DB7C88BFD2E8CC43E839B436FBF1521E937F4D 113086~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5EE9C2A1F51AD15153EF564A76B55679E8D63CAD 113086~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~F1295DAFBF5C15A7ED4ED2AE5EB72E260C9041FD 113086~|~1~|~3~|~03/IMS~|~Minor work on state bridges.~|~04 - Reconstruction - No Added Capacity~|~8133E7F57427167447CF2B612F9E00ED5C879A0D 91607~|~1~|~1~|~01/NHS~|~Replace existing deck on two bridges (TUS-250-2289 L & R. SFNs 7900694, 7900724) and paint/replace existing steel beams. Convert abutments to semi-integral and raise bridge if new steel is being used without impacting profile on US 250. Also, provide new approach slabs.~|~13 - Bridge Rehabilitation~|~CF50BE24C7EF499ED3A536A8957B4544C9ABE528 101435~|~1~|~3~|~03/S>2~|~100% Village of Sunbury items~|~05 - 4R Maintenance - Resurfacing~|~809CA215D638594DD75A784C5BCAB37C0BB96163 101435~|~1~|~1~|~01/NHS~|~AC overlay on DEL-36-18.49 to 21.74~|~05 - 4R Maintenance - Resurfacing~|~A7351FA0F5742F4DBD5D422992E6A1B45E668D7F 101435~|~1~|~2~|~02/S>2~|~AC overlay and FGP overlay on FRA-62-31.79 to 33.70; FRA-605-1.89 to 3.17; DEL-36-21.74 to 22.25; DEL-37-21.94 to 23.08~|~05 - 4R Maintenance - Resurfacing~|~AEBC81972CEC2AE905D470F1A6DC8A2F311CD9EE 115634~|~1~|~1~|~01/SAE~|~Guardrail Material on LUC-24~|~~|~D3CC6A5B2086DA18CC3B239ED514BC9B2A9D1BAC 119257~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~025A27AE6076DA97043748D6874F6053647E51A5 119257~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~FA427FBF1D06E6E1484AC9DAE739E93480730121 82755~|~1~|~1~|~01/NFA~|~Relocation of sanitary line at Summit County garage, Boston Heights, Summit County, Ohio.~|~~|~8BEB35CB9B3359DBFFA3B4E6399C9EA864183A46 82755~|~1~|~2~|~02/NFA~|~Factilities Split~|~44 - Other~|~470A274649059D2E372D5928C0E2652794DCD5D6 110790~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E38FD5CA5D1FD564C2E33B8D7FBE4DACB6A7AD6F 109371~|~1~|~1~|~01/MPO~|~Tie replacement, track gaging, surfacing, crossing improvements, rail joint replacement, and signal work. Track improvements will help increase the track speed on this section from 25 MPH to 40 MPH.~|~22 - Rail/Highway crossing~|~761CB8EB89FCA7A08B60C710BA17329A9B793F32 91811~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - Project Impact Advisory Council (PIAC) Funding 5PI7 (80% Federal) / 4PI7 (20% State) - CAP = $1,250,000.00 for CO; District to provide corresponding CE costs - MOT during bridge bridge rehabilitation on Gue-IR 70-12.32.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~41BC3FE0B5A84BE62069024B7A2A68DCF37A0410 91811~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 1) 3001474 GUE IR70 12.32 Intersect: I-70 Over Sr 265; Not BR Eligible for Rehabilitation: Length=442 SD/FO(0) SR=87.6 DSR=5; 2) 3001504 GUE IR70 12.32 Intersect: I-70 Over Sr 265; Not BR Eligible for Rehabilitation: Length=442 SD/FO(0) SR=87.6 DSR=5~|~13 - Bridge Rehabilitation~|~D99E1DCC5B680B872FF86A4EF7D3A4CC14D1C601 126939~|~1~|~1~|~01/BRO~|~Plan split for rehabilitation work on major bridge~|~47 - Bridge Preventive Maintenance~|~9247D7D6D247ECA46192636341D25CDA78CF5D49 100432~|~1~|~1~|~01/MPO~|~Mill and fill~|~05 - 4R Maintenance - Resurfacing~|~78231FEAAB8EC0ADAEBF10CE11A55E25B3513C78 100432~|~1~|~2~|~02/MPO~|~Plan Split for 100% local items (encroachment removals)~|~05 - 4R Maintenance - Resurfacing~|~94A2C2CAB581449356450F057120E65752614C4E 126379~|~1~|~1~|~01/MPO/POCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~BBA2B7FEDAB90DE16332650EB9307ADAA9D97A7A 117420~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~~|~37A2D8BA239DDFDEAAF10A36ADF35ABD2E5CD871 111524~|~1~|~1~|~01/MPO~|~MPO funded items~|~04 - Reconstruction - No Added Capacity~|~660912C3785CE80B16885B7EC3360B79BAA85A57 100543~|~1~|~1~|~01/SAF~|~Upgrade exisiting pavement markers on verious county roads~|~21 - Safety~|~FC79BA98054778671355D0D6590D39205BE53C2D 101616~|~1~|~2~|~02/STR~|~Microsurfacing MAD-56 0.00 to 4.69~|~05 - 4R Maintenance - Resurfacing~|~E985BC7C1B86FE40C03E47A04A848330AE4F26BB 101616~|~1~|~3~|~03/S<2~|~Microsurfacing MAD-56 4.69 to 6.19~|~05 - 4R Maintenance - Resurfacing~|~7B1FCC62EB3816404837778C1EDEC267A7F8BE4A 101616~|~1~|~1~|~01/IMS~|~Microsurfacing MAD IR 70 0.00 to 8.96~|~05 - 4R Maintenance - Resurfacing~|~1A484BEAE781FECB493D08EFE8D41B9D1C0987E0 125605~|~1~|~1~|~01/CMQ/MINE~|~Signal upgrades.~|~21 - Safety~|~C37B855956B103124E6E75AA7F004494F33B8265 99024~|~1~|~1~|~01/SAF~|~District wide raised pavement markers~|~21 - Safety~|~6C46E7D2A58469462614794D1B2B72D76F5D46F1 113987~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~4A35379EE65A2136628CF035B37AD3A78CA4FAF9 113106~|~1~|~1~|~01/STR~|~HIG 50 18.23-21.00~|~05 - 4R Maintenance - Resurfacing~|~9ECF3EF92A4B0F4B3CA69D219CB378E9155AD412 116673~|~1~|~1~|~01/STR~|~Resurfacing on SR 637 in Van Wert County from SLM 0.00 to 4.01 using district preservation funds (80% 4PF7 and 20% 4PS7)~|~05 - 4R Maintenance - Resurfacing~|~337E85DEA4F64E5668D41D182C07A3FE5B2D735E 113382~|~1~|~2~|~02/STR~|~Resurfacing including enhanced pavement markings and an 18" aggregate berm.~|~05 - 4R Maintenance - Resurfacing~|~7E490A83AB617232149404D8DAEEA4E9F705360C 113382~|~1~|~1~|~01/S>2~|~Resurfacing including enhanced pavement markings and an 18" aggregate berm.~|~05 - 4R Maintenance - Resurfacing~|~BA6ACFF25B47906EE2E6EED2E5691278E7F1340C 109294~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 163 0.475, SFN 5331293.~|~10 - Bridge Replacement~|~ACB5C5BA9BE14C8ECFFFE2A967B0C64E0975FA81 107920~|~1~|~1~|~01/SAF~|~Intersection improvements on US 224 at New Milford and Waterloo Roads.~|~21 - Safety~|~8019C744CA1D1995240A96BD15F00E6D67466C01 107920~|~1~|~2~|~02/STR~|~Replacing culverts.~|~04 - Reconstruction - No Added Capacity~|~1AA21B62B6342601D73316E7C6BAD30C8D684825 84460~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7843976 Curtis Middlefield Road Bridge over Swine Creek.~|~10 - Bridge Replacement~|~4176F9316D036808ADCCC3FA03628B9F5FFC5769 122308~|~1~|~1~|~01/SAF~|~New signal~|~21 - Safety~|~8429D478AE8471148AAFAC5887C10887600BF344 119450~|~1~|~1~|~01/BRF~|~Off-System Eligible Bridge Superstructure Replacement~|~13 - Bridge Rehabilitation~|~26D194DEEE7088CCA17B90491DBE4C4C32198D5D 113116~|~1~|~1~|~01/NFP~|~Bridge Plans split~|~13 - Bridge Rehabilitation~|~9CA3B1A556C63A216EFC960094C30781C7E08F00 102129~|~1~|~1~|~01/NFA~|~The City is constructing road improvements, widening Johns Road from Manchester Road past Hi-Way Distributings facility and widening Manchester Road from Renninger Road to Vanderhoof.~|~01 - New Construction~|~E553A0A270EC64BBA345AC8F773AE6245ED4B78F 96415~|~1~|~1~|~01/NHS~|~Culvert repair of a collapsed inlet at SLM 2.53 on US22 in Harrison County.~|~04 - Reconstruction - No Added Capacity~|~54341628B118F01E7AB34B48D81274B8C78A775B 96634~|~1~|~1~|~01/IMS~|~Install DDMS at various freeway / freeway interchanges throughout the state.~|~01 - New Construction~|~FFB899C3890404027FB5F2434F237DE8F0A22DDE 87088~|~1~|~2~|~02/NFA~|~Installation of watermain, to be paid for 100% locally.~|~43 - Utilities~|~5FF16E457851FC0C8DF95CD4C0DFC07E3641BDC3 87088~|~1~|~1~|~01/BRF~|~ Project involves replacing the bridge crossing Norfolk & Southern's rail system, improving horizontal and vertical alignments associated with the bridge. The pavement section in this area will also be widened to improve safety. Improvements will provide the required vertical clearance from the railroad and update all safety features. Mauds Hughes Road: from 0.4 miles north of Princeton Road to 0.35 miles south of Millikin Road. SFN 0932817 Sponsor - Butler County~|~10 - Bridge Replacement~|~CDF6C1B8E3C947B8970001D6F57F627FEDA26A68 115097~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall.~|~~|~93BB05ED921255DD72D9D27A66B8A6E17D56073D 125988~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings, and school zones throughout the district.~|~21 - Safety~|~E8A82BC868B5CA0511A3C5182F6D5A3079A80D82 92195~|~1~|~1~|~01/NFA~|~This project includes pavement repair, resurfacing with fine graded polymer asphalt concrete and pavement markings within the Kelleys Island SP Campground, State Park and State Historic Monument.~|~44 - Other~|~9422F9FE26C22479D1F51670F17CD45BA389AE92 85275~|~1~|~1~|~01/STR~|~Resurface SEN SR18 17.91-23.09~|~05 - 4R Maintenance - Resurfacing~|~0D8D8B095E36F137F2F81BDE54BBA141BF7A6FFF 107413~|~1~|~1~|~01/IMS~|~Fine Graded Polymer AC Overlay on MIA IR 75 SLM 10.84 to 12.75MIA IR 75 SLM 12.75 to 13.72~|~05 - 4R Maintenance - Resurfacing~|~581A4B175E64B9C2CD7BEB1C20066D1672FE2030 107413~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~E7D90541C59B78865DC9814C6061A646AA7A6C56 110610~|~1~|~1~|~01/S>2~|~Split for paving work on SR-21~|~05 - 4R Maintenance - Resurfacing~|~F26AE7C7702085F37A7C6D40FF02EA4D7BFBA979 110610~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~5721FF8631F07EE747A750B457150B009390DC62 107486~|~1~|~1~|~01/NFA~|~The City will construct improvements to five different intersections that need widening, restriping or reconstruction within the City of Euclid.~|~01 - New Construction~|~066887F173B124EC3AF08C307FBB06E62D7677DA 127025~|~1~|~1~|~01/NHS/HEAT~|~SRTS - Design and construction of sidewalks in the City of Heath.~|~28 - Facilities for Pedestrians & Bicycles~|~4EFF50A104AAE009D45A0943C48618A19F0EC3F7 103594~|~1~|~1~|~01/SAF~|~Bike path upgrades.~|~28 - Facilities for Pedestrians & Bicycles~|~2993EA2AFA767E7E86B89E292BCEFB969CD9C9EC 99208~|~1~|~1~|~01/STR~|~This split is for all pavement marking work. This split uses 100% HSIP funds SAC 4HB7. Funds needed after the SAC 4HB7 cap is reached will be provided by Defiance County.~|~21 - Safety~|~45A9AC6785BBD290AFBE628BE485A630F50C654F 88951~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6400841 PER US22 12.02 Intersect: Turkey Run: Not BR Eligible L=99' SD/FO(0) SR=81.2 DSR=5~|~13 - Bridge Rehabilitation~|~2D578E45A9340D4A86DCCF70019F6E24A040BB90 88951~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1) 6400817 PER US22 7.63 Intersect: Panther Run: BR Eligible for Rehabilitation: L=73' SD/FO(1) SR=72.6 DSR=7;~|~13 - Bridge Rehabilitation~|~7C2D4C81A39EF8777D33B0C3DE81FF1738AB4BA3 110334~|~1~|~1~|~01/SAE~|~100% CEAO Safety guardrail funds~|~21 - Safety~|~B9402C81CB9593C6C01781D183DB1A7056393D35 120272~|~1~|~1~|~01/SAF~|~Signal and crosswalk replacement utilizing Federal Safety funds as awarded through the SRTS Program (100% utilizing TRC).~|~28 - Facilities for Pedestrians & Bicycles~|~B90196AE9A5FE93E420190F412EA9E4E61EFCEC3 109766~|~1~|~1~|~01/IMS~|~Fine graded polymer asphalt concrete overlay (1.00")~|~17 - Construction Engineering~|~B79BD05E745E0B9D3A504326BB58523AB6E83A5E 91115~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds.~|~13 - Bridge Rehabilitation~|~E6CD22998E892A83695386C2C08FDE114DDDA4B5 111257~|~1~|~1~|~01/NFP~|~Pymatuning State Park resurfacing.~|~~|~0BBE47FC4D8219FAEF4E3FEE36CB0F1E03E31983 91824~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Bridge replacement of 6005438 MUS SR208 5.54 Intersect: Over N Br Symmes Creek; Not BR Eligibla: Length=16 SD/FO(1) SR=48.8 DSR=4~|~10 - Bridge Replacement~|~1809562A3964A2F9B5F25EC800A912F9C57DE5B9 91824~|~1~|~2~|~02/BRF~|~"02/BRF/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6005551 MUS SR208 10.41 Intersect: Over Symmes Creek; BR Eligible: Length=49 SD/FO(1) SR=40.4 DSR=4~|~10 - Bridge Replacement~|~3026B5CC9CD8079D165D83A4CF1B9E65293D1CAA 105081~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~4029B07CDE24D6642E8DF74ED8AFA5E77C073600 109512~|~1~|~1~|~01/NFA~|~Adding turn lanes for new Provia location north of Strasburg~|~44 - Other~|~DC44CF6962F846C59E65A3F4EDCBB2EA4F8BF465 105025~|~1~|~1~|~01/S>2~|~Repair embankment slip on PIC-674-10.2 using GSM FY2020 application, awarded funds~|~44 - Other~|~99534FF21A8AE046F1B38D2ED3B5E86336A7A2A0 105025~|~1~|~2~|~02/S>2~|~Invert paving and repair of culvert (CSF 1974911) at SLM 10.35~|~04 - Reconstruction - No Added Capacity~|~7C65A55663C1B916C6D76D2350909AEE62B703B4 87937~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7 (100% State) - No CAP - Replace Structure on 1) 3006557 GUE SR660 3.68 Intersect: Ditch and 2) 3006565 GUE SR660 4.11 Intersect: Ditch~|~10 - Bridge Replacement~|~8D58924F05802B21B5539A7D45A5F7385B0A6B36 103072~|~1~|~1~|~01/S>2~|~Mill and resurfacing on STP route.~|~05 - 4R Maintenance - Resurfacing~|~56A2A8B3654C36D480EBD038C01B37481B4657AE 113413~|~1~|~1~|~01/S>2~|~Partial depth replacement of the roadway surface as well as new thermoplastic lane traffic striping and raised pavement markers.~|~05 - 4R Maintenance - Resurfacing~|~5D322572A82F7C8A60B1781FDD0E1866BE67FD71 113413~|~1~|~2~|~02/S>2~|~Curb repairs - locally funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5E79D98498267518732176521AFE4C1178B6680A 126550~|~1~|~1~|~01/STR~|~Rehabilitation of structure (SFN 2300125) over Muddy Prairie Run on US 22 in Fairfield County.~|~13 - Bridge Rehabilitation~|~C08DB92D01B432EC609AD252DC18E6B655F1F1EE 101413~|~1~|~1~|~01/STR~|~AC Overlay w/Rpr WAY 94 8.18 - 14.15. ~|~05 - 4R Maintenance - Resurfacing~|~10343107D74852DBAB1D382118D9F1D4EFB9ED8F 101413~|~1~|~2~|~02/STR~|~Bridge Work:WAY-SR-94-11.149 SFN 8503974 ORRVILLE DITCHExpansion joint repair/replacement (048)Bridge railing upgrade/repair (061)WAY-SR-94-13.361 SFN 8504024 DITCHExpansion joint repair/replacement (048)Bridge railing upgrade/repair (061)131 - Deck Patching - Concrete~|~13 - Bridge Rehabilitation~|~5169B5208933A0556C3FD76362425326B327AAA1 88733~|~1~|~1~|~01/IMS~|~Resurfacing / Mill & Fill~|~44 - Other~|~971A75355AA74B07CA821EB3536659BD79654BD7 84301~|~1~|~4~|~04/NHS~|~80/20 fed/state split for culvert work on the NHS portion of the project at SLM 0.93.~|~05 - 4R Maintenance - Resurfacing~|~0C415119B352A626D1F7E455407FCB7B514CDC01 84301~|~1~|~1~|~01/NHS~|~80/20 fed/state split for pavement work on the NHS portion of the project from SLM 0.00 to 2.75.~|~05 - 4R Maintenance - Resurfacing~|~3A1B1C020901F92A519390AC48137165BC270966 84301~|~1~|~2~|~02/S>2~|~80/20 fed/state split for pavement work on the urban STP portion of the project from SLM 2.75 to 4.05.~|~05 - 4R Maintenance - Resurfacing~|~BF1694665C2D5DFA15150A571F0222BD14DDE4E6 84301~|~1~|~3~|~03/STR~|~80/20 fed/state split for pavement work on the rural STP portion of the project from SLM 4.05 to 4.89.~|~05 - 4R Maintenance - Resurfacing~|~F331FFEC148F685739BAA45578AE7FCAC0C79326 113715~|~1~|~1~|~01/SAF~|~Install a single-lane roundabout at the intersection of Princeton and Maud Hughes Road~|~21 - Safety~|~49DB17478442A42F529A1FDA81541654D6A73F0E 113715~|~1~|~2~|~02/BRO/BCEO~|~Replacement of SFN 0934755, which carries Princeton Road over Gregory Creek. 100% locally funded.~|~10 - Bridge Replacement~|~9F3052F53B032A3BA365A544F961F93486F2345C 93987~|~1~|~1~|~01/NHS~|~Replace existing reinforced concrete deck on Bridge JEF-7-2810 (SFN 4101383) with a new deck. Replace approach slabs with new full-width approach slabs and replace backwalls. Also, Paint structural steel.~|~13 - Bridge Rehabilitation~|~85730165D96074C5B76C6FA59AC5AA52D36C6FA5 96695~|~1~|~1~|~01/STR~|~Plan split to cover costs associated with the bridge, appurtenances, and approach roadway.~|~10 - Bridge Replacement~|~B41CEEA0145068EF9F601BA20F8D2497B9FE26C9 103784~|~1~|~1~|~01/STR~|~Landslide repair. MRG 60 21.42. DSR MRG-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9EA23CC43E0792B443F67E10181CA8BF848EFB7D 124580~|~1~|~1~|~01/IMS~|~Plan split for embankment stabilization and repair of broken back pipes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5EC18EFB6ACEB733A05886EB6F814DC2A5A769BE 92786~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on CLA SR 4 from SLM 5.46 (IR 70) to SLM 11.34 (JCT of USR 40).~|~05 - 4R Maintenance - Resurfacing~|~CCC12E97BD465FD857A1570A037B52C9E2521417 121266~|~1~|~1~|~01/STR~|~All work included in this split~|~05 - 4R Maintenance - Resurfacing~|~E133D7F49FDD7CB315B24EF7C62511030976446B 99534~|~1~|~2~|~02/NHS~|~NHS Culvert: ASD-42-5.13~|~17 - Construction Engineering~|~EF6133EC17A4A63404DBB8C7D875E983A0945F97 99534~|~1~|~1~|~01/STR~|~STP Rural Culverts: ASD-3-2.10, ASD-3-2.27~|~17 - Construction Engineering~|~1D5FB32287552D05EBF64AF35BF75A78EED10FA1 80735~|~1~|~1~|~01/NHS~|~SFN 6200540 OTT SR2 25.33 Intersect: County Rd 33 (Gypsum Rd) Left SFN 6200575 OTT CR33 25.33 Intersect: County Rd 33 (Gypsum Rd) Right~|~13 - Bridge Rehabilitation~|~448AED762D968B73D6CD2F99B08ACE2056E6A237 109060~|~1~|~1~|~01/ENH~|~Sidewalk project~|~28 - Facilities for Pedestrians & Bicycles~|~C12E0B13E108BC6B2C544DED633C2BD6C125619D 109060~|~1~|~2~|~02/ENH~|~Sidewalk Project~|~17 - Construction Engineering~|~D4C79F706DDA9F89D7D70CE010B3BE35D7DF45A4 109060~|~1~|~3~|~03/ENH~|~Sidewalk Project~|~17 - Construction Engineering~|~DFADA4A43198F992BCEA797344FA0FDBC47F5877 104240~|~1~|~1~|~01/IMS~|~MAD 142 13.41 L/R over I-70 (SFN 4902823/4902793): Replace decks, parapets, and approach slabs. Paint structural steel~|~13 - Bridge Rehabilitation~|~CF8E4C8090257A0863F7842959FC9CE1BD83FE00 104240~|~1~|~2~|~02/STR~|~Resurfacing MAD SR 142 from 13.05 to 13.40 and 13.48 to 13.66 and MAD CR 7 from 1.88 to 2.00~|~05 - 4R Maintenance - Resurfacing~|~2128C79E1D8DEB771B4489774B8DCFB0451FF3A2 96854~|~1~|~1~|~01/NFP~|~100% State Stop Bar Detection. All locations~|~44 - Other~|~E7A98D79FAD54651A325B1A94A25D7AE23167EA0 94392~|~1~|~1~|~01/NHS~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~E663E2E208511BE7F7AE3BC4B0682ABC88290A25 102781~|~1~|~1~|~01/IMS~|~This plan split is for work on Interstate bridge.~|~13 - Bridge Rehabilitation~|~A95288EF9A53030AF6C4A0D815BF3C049433FDE5 102781~|~1~|~2~|~02/IMS~|~Plan split for reconstructing the exit ramps from PRE-70 to PRE-127~|~04 - Reconstruction - No Added Capacity~|~3989AB6CC60B78DA6FED706CAE937DBD0F50340C 101828~|~1~|~1~|~01/NFA~|~Resurfacing of Columbia Road in the Village of Richfield.~|~05 - 4R Maintenance - Resurfacing~|~CBB0F9DC6AD5A466155E696B6A2C7BB9DD572B35 122738~|~1~|~1~|~01/S5K~|~Funding split for MPO STBG scope items~|~05 - 4R Maintenance - Resurfacing~|~7BCF2F7773E3F4BE2EE9B8B8F7FFA1125CE3A5D0 95578~|~1~|~1~|~01/STR~|~Replace Bridge (twin 60" pipes) with a culvert (58"x91" concrete elliptical). LOR-162-00.45 Winston Creek~|~04 - Reconstruction - No Added Capacity~|~B81DB2D9D675E7167552236A57BCAC5603B3674F 118258~|~1~|~1~|~01/BRF~|~Plan Split for 100% LBR funds~|~10 - Bridge Replacement~|~C268529ED03E35DBF215139498DCDD5ECDA13F50 102357~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district.~|~21 - Safety~|~F980B2B26526DF29A70CE82B41F6E15D9E4DA068 121175~|~1~|~1~|~01/NFP~|~HS plans split.~|~44 - Other~|~118ED17CDA17DBEA18E1BB5CD0E85FD90ED83C80 98266~|~1~|~2~|~02/NHS~|~Urban System Resurfacing in the City of New Philadelphia of SR 416 from SLM 10.82 (US 250) to SLM 11.53 (SR 39), including asphalt resurfacing and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~06131BF048FFCD744E55437D5D5019304266C84B 98266~|~1~|~1~|~01/S<2~|~Urban System Resurfacing in City of New Philadelphia of SR 416 from the S. Corp. Limit to SLM 10.82 (US 250) and from SLM 11.53 (SR 39) to the N. Corp. Limit. Work includes asphalt resurfacing and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~795D70476DFD95E4CE109C53219D9DF7E174C2C4 98266~|~1~|~3~|~03/S<2~|~Urban System Paving in the City of New Philadelphia of SR 416. Eligible items include curb ramps and aux. pavement markings. Also includes all work on S. Broadway from Commercial Ave. to Howe Ave. (Part 6).~|~05 - 4R Maintenance - Resurfacing~|~50718D2386AE6CD09C3E136D930975F1228AF337 101824~|~1~|~1~|~01/NFA~|~The County is assisting the Coshocton Cty Port Auth with a road re-construction on Coshocton County Road 12~|~03 - Reconstruction - Added Capacity~|~418B552F99964D93C5766A4381000F5C26E72FFA 87853~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7.~|~13 - Bridge Rehabilitation~|~CFFCCBF89375EA66B62F1ED017F7644C10CC09E3 95307~|~1~|~1~|~01/BRO~|~Replace deteriorated twin 11'-3" corregated metal pipe arches. SFN 1206842.~|~~|~5CF5150E542B4C0D954F40765A44DEC772963B7F 99870~|~1~|~1~|~01/MPO~|~Construct new Stark County Park District Nickel Plate Trail pedestrian bridge over Pleasant Valley Drive.~|~~|~0D067DDEDE68767CDFCC56DA7848EA183C9E0C5B 126597~|~1~|~1~|~01/ENH~|~resurfacing of SR 73 from BUT/WAR County Line to S. Main street~|~05 - 4R Maintenance - Resurfacing~|~CE5319892D4553B6D3253A2B651213588C3B9E57 88770~|~1~|~1~|~01/SAF~|~Project includes lengthening the existing WB left turn lane from Kinsey to US-68, widening to provide a WB right turn lane from Kinsey to US-68, new curb and sidewalk, and replacing the existing span wire traffic signal with a mast arm system at the intersection of US-68 and Kinsey.~|~21 - Safety~|~CD70E24F144B5F4FEBD6DA5479890524CC10FA04 122386~|~1~|~1~|~01/S>2~|~Work to construct a 10? multi use path, cConnections to existing sidewalks, signage, crosswalk striping and signals ~|~28 - Facilities for Pedestrians & Bicycles~|~627F3F94C5881723E0E6A2B062520AC8D9CB550B 87440~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~5DB038166F43F6781AC9A06E6AEC87DB78AEB344 97045~|~1~|~1~|~01/STR~|~All roadway work:ASD-003-00.00 to 5.94, 06.10 to 06.81, ASD-060-00.00 to 01.47~|~05 - 4R Maintenance - Resurfacing~|~D90398CCF4A0AA6570A26D046F3B05B47F282CED 97045~|~1~|~2~|~02/STR~|~Bridge work on following structures:ASD-003-0254ASD-003-0337ASD-003-0411ASD-003-0529ASD-003-0620~|~13 - Bridge Rehabilitation~|~3FF63C53977CA90E673489B9239747A60FFD6C3D 11229~|~1~|~1~|~01/NFA~|~Unfunded railroad bridge project.~|~10 - Bridge Replacement~|~62416538C2F6C81043C2586287D1532A6E63AFF9 112483~|~1~|~1~|~01/MPO~|~Plan Split for MPO eligible work from Johnnycake Rd to Painesville SCL (Part 1-PID 112483).~|~05 - 4R Maintenance - Resurfacing~|~09F76B07D88402B414B8321459BEF9529EE705E8 112483~|~1~|~2~|~02/MPO~|~Plan Split for MPO eligible work from Painesville SCL to Mentor Ave (Part 2-PID 112476).~|~05 - 4R Maintenance - Resurfacing~|~17DEB1BC60DDBF45F9CD2C5F3BC21641D33450DD 91465~|~1~|~2~|~02/S>2~|~Grove City urban paving and in urban func class areaFRA-104: 1.49-1.66, 1.68-1.73, 3.40-3.68, 3.71-4.08~|~~|~2EAD0D8350F02A7678B25279E03F30F26089FF64 91465~|~1~|~1~|~01/S>2~|~General system paving and in urban func class areaFRA-104: 0.00-1.49, 1.66-1.68, 1.73-3.40, 3.68-3.71, 4.08-6.53~|~05 - 4R Maintenance - Resurfacing~|~C8901924FEDB43E27C7E650F7062187DD9C769C5 114620~|~1~|~1~|~01/SAF~|~Safety Ramp Clear Funding -4HJ7 (90% Federal) / 4BC7 (10% State) - See CAP Comment - Installation of turn lane on WB off-ramp from IR 70 to SR 209.~|~21 - Safety~|~257FF8DD9738FA87B2530A80AE5D393FC1F6C117 125921~|~1~|~1~|~01/ENH/STOW~|~Construct sidewalk and multi-use trail.~|~28 - Facilities for Pedestrians & Bicycles~|~8FC001C9E58904804FD235184BC3E3D4A3BA5919 125179~|~1~|~1~|~01/SAF~|~District wide fast dry pavement markings~|~21 - Safety~|~023697D7517A73766C521CCDC3836F361765CB2F 116795~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~F5EBF492686CEE63A0C4454016D6F19BB72B17B5 100945~|~1~|~1~|~01/NHS~|~STA SR 619 from 15.73 to 16.44.~|~~|~13A5BCACE0252AA9812EF04B4D8DDF52BEDB0525 100945~|~1~|~2~|~02/S<2~|~STA SR 619 from 15.44 to 15.73.~|~~|~AF50F872B2AA83CFF1B319AC9FC76AF9EF73DFE9 100945~|~1~|~3~|~03/STR~|~STA SR 172 from 25.53 to 30.32STA SR 619 from 7.36 to 15.44.~|~~|~AC12ED363453626CD751431DF3A044D75B9B5F55 114002~|~1~|~1~|~01/SAF~|~Install new raised pavement markers on various county road in Clinton County.~|~21 - Safety~|~B8378D4E7727EC5E913FD7D75EBD00961F0AE340 124766~|~1~|~1~|~01/NHS/GENE~|~Reconstruct roadway.~|~04 - Reconstruction - No Added Capacity~|~95165A915408EE208F5FCB1ED4D453AFAF0C4B0F 79463~|~1~|~1~|~01/BRO~|~Bridge replacement~|~10 - Bridge Replacement~|~3113A6726589349396BA5285EF2FB4860C10FE86 91346~|~1~|~3~|~03/STR~|~General system paving and in the rural func class area.SLM 2.77-7.78~|~05 - 4R Maintenance - Resurfacing~|~8B49060B57ED0B7034D211EC26F5E588CE980BC8 91346~|~1~|~1~|~01/S<2~|~General system paving but within the Marysville urban func class area.SLM 1.77-1.81, 2.09-2.77~|~05 - 4R Maintenance - Resurfacing~|~B31A88410C439C2C04519F47F3A0E05F21F01452 91346~|~1~|~2~|~02/S<2~|~Marysville urban paving SLM 1.81-2.09~|~05 - 4R Maintenance - Resurfacing~|~4376EFD3F4D9D3F3C0C772455092558467DC8F06 99200~|~1~|~1~|~01/SAF~|~Install a new traffic signal at the ramp intersection of IR 75 Northbound & Northwoods Blvd. (CR647) to mitigate congestion and improve traffic opertation.~|~21 - Safety~|~F9298B8439F4D275ABC4BFF838FB50C4BFD80AA5 99200~|~1~|~2~|~02/SAF~|~Preemption work to be installed with a new traffic signal at the ramp intersection of IR 75 NB & Northwoods Blvd. (CR 647) to mitigate congestions and improve traffic operation. This is at the 100% expense of the local.~|~21 - Safety~|~8AE84B4BEB2CDA0EEA895D6674E46C041F937E6F 105198~|~1~|~1~|~01/STR~|~plan split for the roadway work on the rural section:WAR-48: SLM 1.64-4.64~|~~|~6A87B4CEAF745B2502FAC3FB730E077E0DE0CE0B 105198~|~1~|~2~|~02/S>2~|~plan split for the roadway work on Lrg Urban sections:WAR-48: SLM 0.30-1.64WAR-48: SLM 4.64-5.23~|~~|~D9F2D66B33AA22D2D0A97249632185433FB0B06D 79792~|~1~|~2~|~02/IMS~|~Bridge Rehabilitation~|~47 - Bridge Preventive Maintenance~|~BB98AC8E5B878932B7EAE7749A6020983D1CA7A3 79792~|~1~|~3~|~03/IMS~|~Asphalt Grindings and ONYX pavement treatment (100% State)~|~05 - 4R Maintenance - Resurfacing~|~2DA600395CD9FB9BB202996F60FB0DCB93D5D1E1 79792~|~1~|~1~|~01/IMS~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~A734E0F6D6BA4EB9F7AA604DC2A8D6A07F8DE64A 100297~|~1~|~1~|~01/NHS~|~Microsurfacing of TRU SR 11 from 9.97 to 12.63, TRU SR 45 from 0.00 to 5.78, TRU SR 46 from 0.00 to 2.31 and 5.60 to 7.08.~|~05 - 4R Maintenance - Resurfacing~|~057542F2646DCDAF1BD42B862958A90C442D4680 105568~|~1~|~1~|~01/S>2~|~Columbus urban area plan split: DEL-37-23.08-23.17 DEL-257-0.00-0.77 DEL-745-2.57-4.00 DEL-750-0.00-0.98 DEL-42-6.27-6.45 FRA-745-0.34-0.49 FRA-745-0.61-0.65 FRA-745-0.71-0.96 FRA-40-0.00-0.46 FRA-40-3.18-4.02 FRA-40-4.33-4.39 FRA-40-4.43-4.52 FRA-62-31.65-31.79 FRA-62G-0.00-0.04~|~~|~EAB56A54772ED8DF170553AF7DFE28B012D1C3D4 105568~|~1~|~2~|~02/STR~|~Rural plan split: DEL-37-23.17-29.08 DEL-229-0.30-6.52 DEL-22IC-0.00-0.20 DEL-656-0.00-4.69 DEL-745-4.00-7.03 FRA-665-5.18-6.99~|~~|~29D398483881B275CC3B40A86300C11DA07F7DAA 105568~|~1~|~3~|~03/NHS~|~NHS plan split: DEL-23-5.13-5.45 DEL-23-7.41-8.39 DEL-23-14.23-14.27 DEL-23-14.37-16.10 DEL-36-12.45-12.70 DEL-36-12.81-12.83~|~~|~F0D9441EB1F46833F0E3B4071B01FF5B71E12ECB 105568~|~1~|~4~|~04/S<2~|~Delaware urban paving plan split: DEL-23-14.10-14.23 DEL-23-14.27-14.37~|~~|~7353919C4C4AF8F7E8765C99E53BE787DEEE7446 105568~|~1~|~5~|~05/S<2~|~Darbydale urban area plan split: FRA-665-4.26-5.18~|~~|~463CAEC5164BE112EC9A5388D51DAF6B30CC1253 106638~|~1~|~1~|~01/NFA~|~TAP grant for bike path along Front St floodwall in Portsmouth.~|~21 - Safety~|~1141074554F84758A428E8061422F420403DE955 109452~|~1~|~1~|~01/NFP~|~Culvert repairs/replacements, includes ditch elimination on STA SR 619.~|~04 - Reconstruction - No Added Capacity~|~E1B325726FBAF6A9F58F2D8F6E75BE8B34FAF51F 111118~|~1~|~1~|~01/STR~|~Repair Culvert~|~04 - Reconstruction - No Added Capacity~|~4DA1002E8BBF68B3F92EC85C199FA222129ACDBF 92671~|~1~|~1~|~01/MPO~|~Resurfacing CR 115 1.26 - 2.65~|~05 - 4R Maintenance - Resurfacing~|~8CF065A42C1D5A17A400FD547FC780958D0C8656 121196~|~1~|~1~|~01/NHS~|~Urban paving~|~05 - 4R Maintenance - Resurfacing~|~4EAB3D1D0CB1B34DE08EBF26313B49579402583A 122393~|~1~|~1~|~01/NFA~|~Plan split for ODNR Resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~79B1085AF155EE01C86EC7D798566EA646A3139A 101570~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Deck overlay and pier patching on GUE-22-7.36 (SFN 3000249).~|~13 - Bridge Rehabilitation~|~A03D16F6843F25BD6E3180C1E8180DDDE0C3C0E7 101570~|~1~|~3~|~03/NHS/CAMB~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local) City of Cambridge - No CAP - Resurfacing on Gue-22-(7.36-7.50) inside the City of Cambridge~|~05 - 4R Maintenance - Resurfacing~|~A17F87EE15ADB76DDBD70F66E5EA319E73E5FF28 101570~|~1~|~1~|~01/ENH/CAMB~|~City of Cambridge TA Project - 4B37 (80% Federal) / 4BG7 (20% Local) TRC approved for 15% match - See CAP Comments - For sidewalks, lighting for Dewey Ave (US22)~|~28 - Facilities for Pedestrians & Bicycles~|~D8AC824C6B2E7226E67942A3040AFE578A0275E5 105405~|~1~|~1~|~01/IMS~|~Bridge painting~|~13 - Bridge Rehabilitation~|~999FF6EBCED40CF1DCFCAAB78C4671D7F8346B67 93350~|~1~|~1~|~01/STR~|~Brdg replacement. On SR217, 2.16 miles east of SR141. 4402855 LAW SR217 2.17 Intersect: Big Ice Creek80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~AAA191AF791988EA99349E4BB1571AD1688F2A8B 90567~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split for all work using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~E717AE81062C6215EB492F16C5D6616D3523DF56 113587~|~1~|~1~|~01/NHS~|~Replace small culverts.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0A424A73D6029D6759F6052055437E7C304819CB 93931~|~1~|~1~|~01/NFA~|~FY2015 Distirct wide raised pavement marker project~|~21 - Safety~|~0BD021B6971ED02EA1F09EF7F4E04B0C2CA0EC9B 114860~|~1~|~1~|~01/IMS~|~Plan split for noise walls~|~17 - Construction Engineering~|~1D4E12276474DCC9DD2FCE8CE5544903C920AAA6 96984~|~1~|~1~|~01/NFA~|~Reconstruciton of TR 1705~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AF4AD852D26BC970FB6A57632C97D5240CC6B8B0 95436~|~1~|~2~|~02/IMS~|~various bridges SFNs: 8703183, 8703213, 8703272, 8703248, 8703302, 8703337, 8703450, 8703426~|~10 - Bridge Replacement~|~048F25806EB88710E138C0314F88CDCD066A9024 95436~|~1~|~1~|~01/IMS~|~WOO-75 from SLM 3.01 to SLM 11.18~|~03 - Reconstruction - Added Capacity~|~2C00C0849ACCC44200B867D9DDA961520FEFB842 124043~|~1~|~1~|~01/NFP~|~Plan split for highway maintenance mowing at various locations throughout the district.~|~99 - State Preventative Maintenance~|~C67AE6766921B2D0F152606590BB064AF6BED39A 121195~|~1~|~1~|~01/STR~|~Upgrade Traffic Signals~|~21 - Safety~|~C434CD942446B55429D3FDEDA459A76B088C405E 87122~|~1~|~1~|~01/NHS~|~Resurfacing a portion of SR 4 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~~|~A59C85031E42F28DCC077BEEFA3258304C893C25 94799~|~1~|~1~|~01/STR~|~Bridge deck replacement project with substructure repair. WAS 821 6.56 (SFN 8405409). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~25381EF0A7BCC3C9BF0E4BC25646F491F31A0FE8 22329~|~1~|~1~|~01/S<2~|~"01/STR/PV/COL" - Relocate CR 430 (Calcutta Smith Ferry Rd) from 0.3 mi east of CR 425 eastward for 0.80 mi to improve vertical and horizontal deficiencies. Includes guardrail, signing, striping, culverts.~|~04 - Reconstruction - No Added Capacity~|~E11577C6B9446950CE8775828CBAEC44647FFA72 95111~|~1~|~1~|~01/SAF~|~Safety funding for RTL at SB exit ramp at 270/Georgesville Rd~|~~|~EB66D97180BA9786ED25547CB1A15AFDEBE12706 98462~|~1~|~1~|~01/NHS~|~HUR-250-15.51-19.84 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8BC3635E5D1CB7976F30A7089134706F4B9E04C8 98462~|~1~|~3~|~03/SAF~|~Funding for center Line rumble stripes Outside of Fitchville.~|~21 - Safety~|~7A669D6F27F4C103A6B174560C0B0AFC9F115166 98462~|~1~|~4~|~04/NHS~|~HUR US 250 1301Preventive Maintenance ?Expansion joint repair/replacement (048) ?Bridge railing upgrade/repair (061) Minor Rehabilitation ?Bridge railing upgrade/repair (061)~|~04 - Reconstruction - No Added Capacity~|~EDEE9A712C747674CD1AEF47105A1E83C48C6F1F 98462~|~1~|~2~|~02/NHS~|~HUR 250 0520:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 0528:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 0747:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 1301:PERVENTIVE MAINTANCE/MINOR REHABHUR 250 1557:PERVENTIVE MAINTANCEHUR 250 1829:PERVENTIVE MAINTANCEHUR 250 1840:PERVENTIVE MAINTANCEHUR 250 1953:PERVENTIVE MAINTANCE/MINOR REHAB~|~13 - Bridge Rehabilitation~|~7911114BF467152C0DE5BF7DA01ACDAAD31CE82F 109472~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades on MAH IR 680 at US 224.~|~21 - Safety~|~4CCAC0EB8DBAB402107DA9676CE5A93FDC34B357 105620~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8FF27DF4697E60EBD0887968D7C8AC4F579F24BC 108856~|~1~|~1~|~01/SAF~|~Profile corrections on HAM US-50 including griding approach to bridge expansion joint and a mill and fill at the rear approach slab to the bridge.~|~~|~24E06BAF5C151884378F38EAA6EC18C3C0581C1E 86326~|~1~|~1~|~01/MPO~|~ Reconstruction and improvements to the intersection incuding total pavement replacement including curb, replace and repair sidewalk and replace the traffic signal at the intersection of Woodman/Dorothy Lane in the City of Kettering.~|~05 - 4R Maintenance - Resurfacing~|~C5AC4FAEE4FFC029B52AAC42193039A46C139CD3 106120~|~1~|~1~|~01/S>2~|~Add sidewalks in the City of Dayton along the south side of Hillcrest Ave to Philadelphia Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~67000C5424F498D73421BA599C2D37145BC2E356 118943~|~1~|~1~|~01/SAF~|~All work included in this split. ~|~21 - Safety~|~8F0C64637DB093065EBB13D7418B46F8646167A1 97635~|~1~|~1~|~01/NFA~|~Build Sidewalk on east side of Buchholzer Blvd from mall entrance to Independence Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~638CC2B6882DDDC710EA163CF84952687FD73558 100424~|~1~|~1~|~01/STR~|~PIK 104 (6.57-10.40)~|~05 - 4R Maintenance - Resurfacing~|~2892ADED795222C3FEEACF59EE0A7396878697D2 100424~|~1~|~2~|~02/S<2~|~PIK 104 (10.40-10.64 & 11.36-12.66)~|~05 - 4R Maintenance - Resurfacing~|~908B23FDB42E5BF3D53113233F6712DDC096E316 100424~|~1~|~3~|~03/STR~|~PIK 104 9.14 (SFN 6601022)~|~47 - Bridge Preventive Maintenance~|~911B2EB6F7631A6D76879B81ECD610D6341DF563 123073~|~1~|~1~|~01/SAF~|~Plan Split for Safety funded scope.~|~21 - Safety~|~FB3DEEF4412308F2823913EFC38FCFB5280BD355 123073~|~1~|~2~|~02/NFP~|~100% Local funding for alternate bid items~|~~|~B8E4FF994F946B3D2F1DF6856E5EC71A420B4A60 112909~|~1~|~1~|~01/MPO~|~Widening of SR 48 to provide additional thru lanes both NB and SB from Willow Pond Blvd. to north of Ridgeview/Saddle Creek. Construction of new sidewalk north of US 22/SR 3. Replacement of existing traffic signals. Addition of a second SB left turn lane from SR 48 to EB US 22/SR 3.~|~03 - Reconstruction - Added Capacity~|~2CAE29946560840901955D00442C733EF7081F16 112909~|~1~|~2~|~02/SAE~|~Traffic signal replacement at SR 48 and US 22/SR 3, widening EB US-22 (west of SR-48) to provide dual EB left turn lanes and widening NB SR-48 (north of US-22) from US-22 to Towne Center Blvd to receive the dual EB lefts.~|~21 - Safety~|~32BBBF9D67EE979F921AD1B963FB1B69D23ADF4A 112909~|~1~|~3~|~03/SAF/WCW~|~Water line improvements being funded by Warren County Water.~|~43 - Utilities~|~8A41D1D2307E7982949CEBE43B777A9206DEC052 113008~|~1~|~1~|~01/STR~|~Replace bridge CLI-28-1691 over East Fork Little Miami with a new structure.~|~13 - Bridge Rehabilitation~|~1BD8E5C4960A1756E987E508A7BB3DA512BF28F5 126303~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~CBCE6440D33AB88AAA66BB3D5998425E63E9CB92 113443~|~1~|~1~|~01/IMS~|~Roadway milling and resurfacing in the City of Miamisburg.~|~05 - 4R Maintenance - Resurfacing~|~5F1725C9C49975E1A13128F077862FAE770E11AF 104329~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~5B5DBC969F1BE108986B89A5C5E2BE545DB0DD81 113330~|~1~|~1~|~01/SAF~|~Split for safety-related crosswalk improvements~|~21 - Safety~|~77DF675A13D4B55914C1CCED604BDE7C45F81804 127268~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 93 over Branch of South Fork Sugar Creek.~|~10 - Bridge Replacement~|~9D4CDF3C71485F6E3FE01964961883AD7161C503 86867~|~1~|~1~|~01/S<2/Chil~|~US50 Urban portion of Paving/Safety Project in Chillicothe Begin SLM 23.37 & terminate SLM 24.11Urban paving. 80% Fed/20% local match by ChillicotheFrom Elm Street (SLM 23.37) to Bridge Street (SLM 24.11) it is proposed to perform intersections improvment, safety corridor improvement, and turn lane addition on US50 within the City of Chillicothe from Elm Street to Bridge Street.~|~05 - 4R Maintenance - Resurfacing~|~07530C295505B1CD425496E56CAADDBFFEC325D5 86867~|~1~|~5~|~05/S<2~|~This plan split is for additional work at the discretion of the District Deputy Director.~|~44 - Other~|~0F6765E837EBF31BE07736BE194ACD2228AE56D0 86867~|~1~|~2~|~02/SAF~|~US50 Plan split F/safety portion of project. Includes intersection improvements, turn lane addition, etc. From Elm Street (SLM 23.37) to Bridge Street (SLM 24.13) it is proposed to perform intersections improvment, safety corridor improvement, and turn lane addition on US50 within the City of Chillicothe from Elm Street to Bridge Street.90% Fed Safety funds/10% local match by Chillicothe02/SAF/PV/Chillicothe~|~21 - Safety~|~213E6EF92DBFF4504803B71EA7960BE65EC2146B 86867~|~1~|~4~|~04/SAF~|~ODOT's Safety program shall assume and bear 100% of the cost of grinding located within the safety areas of the project. Includes Strain poles.On US50, safety portion begins approximately 456.37 ' from High St. and ends 1,149.02 from High St, then resumes 2,547.70' from High St. and ends at Mulberry St.~|~21 - Safety~|~750B2AD3D743957D0B4DAABB88EFC77C885208A6 86867~|~1~|~3~|~03/S<2/Chil~|~City of Chillicothe shall assume and bear 100% of the cost of pavement grindings and parking lot stall markings.~|~05 - 4R Maintenance - Resurfacing~|~D2E2AC0D08BF74E82B35655BA63C711DB57C2AD5 88957~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Backwall rehabilitation on 1) 4503333 LIC IR70 11.04 Intersect: Ir70 Ovr Reservoir Feeder; BR Eligible for Rehabilitation: Length=73 SD/FO(1) SR=62.0 DSR=6; 2) 4503368 LIC IR70 11.04 Intersect: Ir70 Ovr Reservoir Feeder; BR Eligible for Rehabilitation: Length=73 SD/FO(1) SR=57.7 DSR=4; 3) 4503392 LIC IR70 11.93 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=138 SD/FO(1) SR=59.9 DSR=7; 4) 4503422 LIC IR70 11.93 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=138 SD/FO(1) SR=55.6 DSR=5; 5) 4503570 LIC IR70 15.01 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=106 SD/FO(1) SR=62.4 DSR=6; 6) 4503600 LIC IR70 15.01 Intersect: Ir70 Ovr S.F. Licking Riv; BR Eligible for Rehabilitation: Length=106 SD/FO(1) SR=58.9 DSR=5;~|~13 - Bridge Rehabilitation~|~47B8B275047B91178A614FBBFD2EA3896A8F314C 88957~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7 (90% Federal)/4PS7 (10% State) - No CAP - Backwall repairs and approach slab work for 1) 4502884 Lic IR70 00.74L Intersect: over TR 36 Palmer Rd; Not BR Eligible for Rehabilitation: Length=165' SD/FO=0 SR=87.8 DSR=7; 2) 4502914 Lic IR70 00.74R Intersect: over TR 36 Palmer Rd; Not BR Eligible for Rehabilitation: Length=155' SD/FO=0 SR=87.8 DSR=7; 3) 2301598 Fai IR70 00.84R Intersect: Blacklick Creek; Not BR Eligible for Rehabilitation: Length=114' SD/FO=0 SR=86.3 DSR=7; 4) 2301563 Fai IR70 00.84L Intersect: Blacklick Creek; Not BR Eligible for Rehabilitation: Length=114' SD/FO=0 SR=92.6 DSR=7; 5) 2301628 Fai IR70 01.19L Intersect: over SR 256; Not BR Eligible for Rehabilitation: Length=177' SD/FO=2 SR=88.0 DSR=6; 6) 2301652 Fai IR70 01.19R Intersect: over SR 256; Not BR Eligible for Rehabilitation: Length=181' SD/FO=2 SR=86.0 DSR=6;~|~13 - Bridge Rehabilitation~|~C8A5CB4810A5563D68C434B57C2D268F06D5FD69 122679~|~1~|~1~|~01/SAF~|~Installing median cable barrier.~|~21 - Safety~|~3CDCF711F888088D3C535403006FE1CA4606B908 89190~|~1~|~1~|~01/S>2~|~Plan Split for SFN 0406635 ATB SR 531 0917 lift bridge over Ashtabula River.~|~~|~6360E69531066D231005CF226B55841D2A6A9FA5 99581~|~1~|~1~|~01/MPO~|~Resurfacing Tod Ave from Market St to Elm Hill Drive, and Resurfacing Atlantic Street from Mahoning Ave to Elm Rd using rubberized asphalt as well as new pavement marking and signs. Includes planing existing surfaces and adding asphalt leveling course prior to resurfacing. Includes incidental drainage work, ADA curb ramps; curb, linear grading behind curb and sidewalk repair where needed.~|~05 - 4R Maintenance - Resurfacing~|~EABD111C79CE35A847628F971BEF3E8DB58A959E 112287~|~1~|~1~|~01/NHS~|~2" Overlay with asphalt concrete, 2" mill and ill in areas with curb and gutter on: MOT-4 SLM 2.48 to 4.30~|~17 - Construction Engineering~|~00D13EFD7E12EC861B8C69A744FC664722B8D0E7 126541~|~1~|~1~|~01/NFP/PENI~|~Slide repair and culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~DA86A31C1678713E411FD913AFF2BE4E56B8DA9B 126372~|~1~|~1~|~01/MPO~|~Plan split for all federally eligible items within PID 126372. ~|~05 - 4R Maintenance - Resurfacing~|~B7834D4FB392070EA693A9470DF88A9BF70A6C81 124495~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement.~|~44 - Other~|~03D2E1F6C26C16BB8A110E7A920F281A3AB4932C 97653~|~1~|~1~|~01/NFP~|~Construct new District 10 HQ Garage. Funded 100% state.~|~44 - Other~|~DCDAC7E1B642F2832AF04F5C684B24A00C761607 116120~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - 90% Federal and 10% State - resurfacing along IR 70 in MUS~|~05 - 4R Maintenance - Resurfacing~|~E401821BC7CDC8EAC528FA55C1849A7737435347 116204~|~1~|~1~|~01/STR~|~Geotech repairs along BUT-126~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~88FF4C77B938D5B9697D28C221C3695D82B7287D 105122~|~1~|~1~|~01/NHS~|~Double Microsurfacing of STA US 30 from 4.50 to 7.71 Microsurfacing of STA SR 44 from 13.68 to 14.16, STA SR 800 from 7.36 to 8.15.~|~~|~9BD6E27C235199012CFF19C468B26926BECB767D 105122~|~1~|~2~|~02/S>2~|~Microsurfacing of STA SR 800 from 3.62 to 7.36.~|~~|~607D2D9E4184AF7EFDE2E5B7C522423A18F005A4 105122~|~1~|~3~|~03/STR~|~Microsurfacing of STA SR 44 from 19.39 to 23.21, STA SR 153 from 9.87 to 14.69, STA SR 183 from 0.00 to 3.55, STA SR 800 from 0.00 to 3.62.~|~~|~82DBA44340E76D4593E6DB3F92A0ABECB06BB6B8 102394~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DB3D9AFD401B8A6266540DA532E7C662343386AB 102394~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~349D10CF4DCBD5D603C7631A91849CF06BF3DE4E 102394~|~2~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A972A6F83194AF09AD1D598EB31238EB6FC782D0 102394~|~2~|~4~|~04/STR~|~Minor bridge rehab, span 10 to 20'.~|~04 - Reconstruction - No Added Capacity~|~9058C73AC8B5726D735DAF87A2B7D0468EDE77B9 102394~|~3~|~5~|~05/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~565B77B10E2F92997E67DAE77357470B2A16AB8C 102394~|~3~|~6~|~06/S>2~|~Resurfacing utilizing major rehab funds.~|~05 - 4R Maintenance - Resurfacing~|~4B693A564B8839856E11B970E0494D5C7BFAC274 102394~|~3~|~7~|~07/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~07F04FFFCA27D3FE73534E3A69B1622DB7A9B413 102394~|~3~|~8~|~08/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~C8A12487FA4A8B0E77BD32760B13A6910F868646 102394~|~3~|~9~|~09/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~FAC6E79ADCE4BA2003F062A769D6EBEBBE01A5EA 102394~|~1~|~10~|~10/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~6E880A3AFD8583A7F19CE509D96CCC08FD1806D1 89722~|~1~|~1~|~01/ENH~|~80/20 funding split using federal MPO Enhancement funding~|~28 - Facilities for Pedestrians & Bicycles~|~07E811C137F9CBA7D1AB592124EE1281CFE05117 89722~|~1~|~2~|~02/ENH~|~Work items using 100% local funding.~|~17 - Construction Engineering~|~0A40C05C5D8ACC89E4C139B2A1CA706697A13652 112727~|~1~|~1~|~01/NHS~|~Convert to semi integral, change parapet rail at MRW-314-20.71~|~13 - Bridge Rehabilitation~|~940DB2FAB386B43CF183E1F85E01BB7CB30BDB69 117006~|~1~|~1~|~01/NHS~|~Split for bridge work on the NHS~|~13 - Bridge Rehabilitation~|~B1C170C956679924D24DFD6124A62DD65B21FB16 115481~|~1~|~1~|~01/NFP~|~Split for non-PID related tasks for PID 112426~|~17 - Construction Engineering~|~1507D15C2F98E1973658864BB98F609CE1159850 87220~|~1~|~2~|~02/BRO~|~It is proposed to replace the deficient structure (SFN 0100757). Project is 2.73 mile (0100757) north of the Brown County line. ~|~10 - Bridge Replacement~|~0B5E55E22EC40B8572972B7BB17C4E06779A32A7 87220~|~1~|~1~|~01/STR~|~It is proposed to replace the deficient structure (SFN 0100846). Project 4.29 mile (0100846) north of the Brown County Line. 80/20~|~10 - Bridge Replacement~|~9C57B751C849A4BC6DEE2947F9D37160C7979AD8 106226~|~1~|~1~|~01/SAF~|~Reconstruct various signals in the City of Franklin.~|~~|~587D8D19E8D1EEFD69966D49D065EEC2C24E470C 113447~|~1~|~1~|~01/SAF~|~Upgrade traffic signal with mast arm poles, install back-plates, Install left turn flashing arrow, advanced detection for all directions, install additional signal heads, Implement leading pedestrian phase, with signal timing and pedestrian crossing improvements.~|~21 - Safety~|~C3031CC6C0471D7AAF0B1D22CE5E7104D0D3C17E 109976~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract for FY2025 in D8. Locations to be determined.~|~21 - Safety~|~20876CD787F2ADD1E35DDA0534A6A65924C57BFD 86667~|~1~|~1~|~01/ENH~|~Create observation deck on partial remnants of Ft. Steuben Bridge Pier #2 after the bridge is demolished. Project to construct safety railing around pier perimeter, set in place a pre-built pedetrian foot bridge, construct a parking lot, pave the access road and provide a memorial placard of the bridge. Will be part of the Steubenville Marina.~|~28 - Facilities for Pedestrians & Bicycles~|~198B2BB58A7C58A197E80E61B2109042F30D660C 114691~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract in D8. Locations to be determined.~|~21 - Safety~|~E38BB2E51242D04F9F8083D835B8852577E205C7 126121~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~FC317246D967E8010AC0D14AFCA1BD4D286D2298 115394~|~1~|~1~|~01/BRO~|~Replace Court St. Bridge in Urbana over Town Branch~|~10 - Bridge Replacement~|~4D0822EC8C805AB92C47ABC8A8F068F4957D968C 93933~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2017. Various routes and sections in D10. Funded 100% state.~|~21 - Safety~|~A537C3041D9C1D97D4035A0CB45B404547610C7A 102787~|~1~|~1~|~01/STR~|~Micro surface various STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~929B673E9D29DB864518B54E9D022BAFB351B99A 102787~|~1~|~2~|~02/S<2~|~Micro surfacing various STP < 200K routes~|~05 - 4R Maintenance - Resurfacing~|~3E0549549636122848F24392A5A1B4D9B0986DD9 102787~|~1~|~3~|~03/NHS~|~Micro surfacing various NHS routes~|~05 - 4R Maintenance - Resurfacing~|~7984F10899F053538B0C74EC9CE54C663E3921BB 127044~|~1~|~1~|~01/NHS~|~Intersection improvements at the GRE-35 ramps to/from Trebein Road~|~21 - Safety~|~0A734A3F6D52127905CEFCD27BC8AD9502CCD95B 96386~|~1~|~1~|~01/SAF~|~Upgrade pedestrian signal facilities at the intersection of SR 66 and 7th Street. The project will install school zone flasher assemblies on SR 66.~|~21 - Safety~|~D06FE5F2AF1AB326C963E15122FE3EFC896613A8 105280~|~1~|~3~|~03/S<2~|~Chip seal on small urban route: SHE SR 29 SLM 19.99 to 20.31~|~17 - Construction Engineering~|~3CCD13D002D7E13B4AC4672FE5EF378DEE440283 105280~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal Aid routes: AUG SR 198 SLM 7.90 to 11.01, DAR SR 722 SLM 6.16 to 10.16.~|~05 - 4R Maintenance - Resurfacing~|~33CBDD5B7A652C648611222E3C0AE9A69053784C 105280~|~1~|~1~|~01/STR~|~Chip seal on rural routes: DAR SR 571 SLM 20.76 to 24.88, MER SR 707 SLM 16.65 to 19.43, MER SR 219 SLM 17.66 to 19.91, SHE SR 29 SLM 20.31 to 22.31~|~05 - 4R Maintenance - Resurfacing~|~8CE0566BCD64C3583E54940BCF5F67B77BEC19F1 88779~|~1~|~2~|~02/NHS~|~Replace or rehab deteriorated backwalls/expansion joints/approach slabs District Wide. Include necessary structural steel repairs and bearing rehab on SFN 1203150 CLA US 68 1241.~|~~|~4E0D0D299BEA1E55138433452696318D78F16BE2 88779~|~1~|~1~|~01/NHS~|~Replace or rehab deteriorated backwalls/expansion joints/approach slabs District Wide. Include necessary structural steel repairs and bearing rehab on SFN 1205641 CLA SR 334 0.86 and SFN 1203150 CLA US 68 1241.~|~13 - Bridge Rehabilitation~|~E243B67568C1F1DEF7B4CCDAAA67B87FEAA196B7 114781~|~1~|~2~|~02/NHS~|~BUT-4-1816 bridge~|~13 - Bridge Rehabilitation~|~DD84E56BD3BC2F1524164381F169808C439EAC10 114781~|~1~|~3~|~03/S>2~|~Bridge BUT-127-1087~|~13 - Bridge Rehabilitation~|~8B97462AF51F1FB71004B39CE05DF7E8551A635C 114781~|~1~|~5~|~05/NFP~|~BUT-748-0032 bridge~|~13 - Bridge Rehabilitation~|~48A056B4C5D14CBA3F7FD504D08BA83C9DDBE1E3 114781~|~1~|~1~|~01/IMS~|~Project to perform minor maintenance bridge repairs on Interstate bridges BUT-75-0279L/R and HAM-75-1908R~|~47 - Bridge Preventive Maintenance~|~CD97435CDD61B868D4A0A346C6BFF5FD01AABDAE 114781~|~1~|~6~|~06/S5K~|~Plan split for the two BUT-122D in the area of Milddletown~|~13 - Bridge Rehabilitation~|~26D6AC0C02C1249038ED0150275831E7D95182F4 114781~|~1~|~4~|~04/STR~|~BUT-122 bridge, and BUT-73 bridge~|~13 - Bridge Rehabilitation~|~06F713685DB62571B415AAF867145ED6DC8BF51C 82263~|~1~|~1~|~01/SAF~|~District Allocation - NHS: RIC 30 4.07-9.13, RIC 309 6.15-9.04~|~21 - Safety~|~279D3A8119992E39852BCDB90AA52380E5E5F234 110543~|~1~|~1~|~01/STR~|~Plan split for resurfacing a portion of BUT-744~|~05 - 4R Maintenance - Resurfacing~|~B6D5E75478DB96754B6449B497CFEC9929ECF4C1 115397~|~1~|~1~|~01/ENH~|~Construct Sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~9F41E5C016337B3B7B323F4ADABC2FA03E8F28DB 107684~|~1~|~1~|~01/STR~|~Resurfacing on SR 117 in Allen County from the Lima Urbanized Area boundary at Hanthorn Road at SLM 23.04 to the Auglaize County Line. District preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~924BD975C1DCC52169EEA3C44F56CEC59185B9F7 107684~|~1~|~2~|~02/S<2~|~Resurfacing of SR 117 in Allen County from the beginning of the project just east of Bowman Road at SLM 19.99 to the Lima Urbanized Area Boundary at Hanthorn Road at SLM 23.04. District preservation funds (80% 4PF7 and 20% 4PS7). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~53920EA5D27D58254AD41DB02934B1FA5B7DD349 107684~|~1~|~3~|~03/SAE~|~Centerline rumble strips on SR 117 in Auglaize County from the Allen County line to the Hardin County line. 100% federal funds from the District Preservation Program budget SAC 4PF7.~|~21 - Safety~|~73126EEB1A893FED76F519A6161A3E5B7A4172F2 107684~|~1~|~4~|~04/SAF~|~Fix the superelevation of the shoulder of a curve on US 30 in Allen County from 19.45 to 19.71 to match the superelevation of the rest of the roadway. Safety Program funds 90% 4HJ7 and 10% 4BC7 until cap is reached then use District Preservation Program funds.~|~21 - Safety~|~CA79B26AE2ED9AD06807CE7C8890DADA9412F9F3 109352~|~1~|~1~|~01/SAF~|~Install median cable barrier on SR-126 from US-27 to I-75 as well as along the HCEO piece of Ronald Reagan between US-27 and I-275~|~21 - Safety~|~EE471A96E2AA8269747705E1DC8B37663890ACB0 95643~|~1~|~1~|~01/S>2~|~Roadway resurfacing including installation of ADA ramps. Adjustment of manholes and water valves, catch basin repairs/replacements CR 25A from Statler Avenue to Riverside Drive.~|~05 - 4R Maintenance - Resurfacing~|~E89BC234B443F5BAC6421C67B019B7E4910B1091 105315~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 2: Acquisition of parcels and structure demolition on the eastern approach to the new WHV. Fill and grade the eastern approach and construct new retaining walls where practical and where they can be constructed in a manner compatible with the design of the new WHV.~|~~|~524079594C957F655E7BEB67F7C885899E95817B 112603~|~1~|~1~|~01/NFP~|~The Seneca County TID will construct the Tiffin-Fostoria Connector Phase 1A~|~44 - Other~|~D5F037C1E084127158E6119ADFD087CD364D15DD 96743~|~1~|~1~|~01/NHS~|~Emergency Type A rock fall landslide repair. WAS 7 39.42. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~899F3D688FEBDBFB661D9CC461D0E6F6C442FCD7 77925~|~1~|~1~|~01/S>2~|~Bridge work associated with HAM-32-0575 (SFN 3102203).~|~13 - Bridge Rehabilitation~|~DA31A8B25510346822DB515989C633A410DEDE49 77925~|~1~|~2~|~02/NHS~|~Plan split for bridges HAM-32-0014, SFN 3102068 and HAM-32-0127, SFN 3102076~|~13 - Bridge Rehabilitation~|~46A8FBF694D290CFD297C4D94AA5588A6AAF8052 97368~|~1~|~1~|~01/NHS~|~Landslide repair project. Locations TBD.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~87BC3EB537496E49BCD13017215E237ACC3A1A40 96595~|~1~|~1~|~01/NFA~|~Aggregate and pavement repairs, paving of Spencer Lake Wildlife Area.~|~05 - 4R Maintenance - Resurfacing~|~9CC32D01F505F315C3E53E17FEA1A2D4E9714EAD 101689~|~1~|~1~|~01/STR~|~Landslide repair. DSR# BEL-028~|~~|~C5EB342128BECF6A0364E8C3274E4E56FD4FD75E 99501~|~1~|~1~|~01/NHS~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7~|~04 - Reconstruction - No Added Capacity~|~EB1552E352F4B073ABDF35080B0C160BB6FCDB72 75442~|~1~|~1~|~01/STR~|~Brdg ReplacementProject is 0.31 miles east of CR 52 (Lenhart Rd). Project Description: It is proposed to replace the existing deficient structure no. 4002520 over a tributary of Holland Fork with a new structure and all necessary approach work. 4002520 JAC SR139 4.4 Intersect: Trib Of Holland Fork80 fed/20 state 01/STR/BR/State~|~10 - Bridge Replacement~|~75B6FEA70193CDA0994DEF28FEEC8C94E462CAB4 88835~|~1~|~1~|~01/NHS~|~This funding split is for resurfacing on the NHS system (US 30). Funds are from the District Preservation Program.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B4982D943DACCD790D380CCD7D5BB0B18794104E 92801~|~1~|~1~|~01/NHS~|~MOE 7 19.51, SFN 5600545. Bridge repairs and deck replacement. Federal 80%, State 20%.~|~13 - Bridge Rehabilitation~|~E35B07C9E5DE978364E9FDA4077603BF57D1F5AD 117981~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~2EEFBE39158E481F04472889BFBC27812F2C2A77 122846~|~1~|~1~|~01/MPO/MACE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0D0CE87DCA44664C77A90025CDA8DB07E473ED3D 95505~|~1~|~2~|~02/NHS~|~100% local items~|~17 - Construction Engineering~|~2BF5AC8AD6271F0B39252E8CA8700B4BB03A5A9C 95505~|~1~|~1~|~01/NHS~|~85/15 funding split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~BE93E8B151DB1DD8EEC0B2469B047FD3D31BDF2D 95583~|~1~|~1~|~01/STR~|~ADA 136 5.87-9.39~|~05 - 4R Maintenance - Resurfacing~|~87E619E53A0350CB55B926CAE8BDFE30B548F83F 95583~|~1~|~2~|~02/NHS~|~ADA 52 8.29-13.10~|~05 - 4R Maintenance - Resurfacing~|~12225D10756A52DDB0D91651C47E47C43343EB09 109189~|~1~|~1~|~01/NFP~|~POR TID to construct Streetsboro City Center.~|~44 - Other~|~BD9A68ABD87212C874AA71AE17917E33E4EF7BB0 112574~|~1~|~1~|~01/NHS~|~Bridge maintenance~|~47 - Bridge Preventive Maintenance~|~0890DF58E0EE16484FC92D255C4A1F1FBC17D837 112574~|~1~|~2~|~02/IMS~|~Noisewall repairs and/or reconstruction along interstate locations~|~20 - Environmental Only~|~18B3C0C0746E07A9F1A7142463B2A80F23DFE46B 112574~|~1~|~3~|~03/NHS~|~Noisewall repairs and/or reconstruction along NHS locations~|~20 - Environmental Only~|~A4E445D48179CDBD1E35E194B57A2C022872FA2E 126957~|~1~|~1~|~01/SAF~|~Plan split for all work for roundabout~|~21 - Safety~|~F25D1A66CC7E937DC31504F43362211D5BD7EB65 116230~|~1~|~1~|~01/STR~|~FY 28 Overlay~|~05 - 4R Maintenance - Resurfacing~|~4FA44F088A08E56AB0874BBB646F788999836884 121176~|~1~|~1~|~01/NFP~|~crack sealing plan split.~|~99 - State Preventative Maintenance~|~8290315C691BA4C3B11060816576881D71C141A3 119230~|~1~|~1~|~01/NHS~|~All items of work associated with the resurfacing of US33.~|~05 - 4R Maintenance - Resurfacing~|~BA3C2ED52BF6ADA03F34DB5DDDD3C4840FE6E6FF 119230~|~1~|~2~|~02/S>2~|~All items of work associated with resurfacing US35 within the Columbus Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~CE6CB0202EBE6DA567D225407AE773C6CA269B2F 119230~|~1~|~3~|~03/S5K~|~All items of work associated with the resurfacing of US33I.~|~05 - 4R Maintenance - Resurfacing~|~DCDC8F719303691F83228C0D4C54267011D79EED 119230~|~1~|~4~|~04/STR~|~All items of work associated with resurfacing of US36 in the STP Rural Area.~|~05 - 4R Maintenance - Resurfacing~|~5D9CFEA445DE87650A2AA5F8123145423C4B2664 91046~|~1~|~1~|~01/NFP~|~Overlay, joint repair and sealing of SFN 7602227 over STA-IR77, and Overlay, joint repair and sealing of SFN 7602243 over Cleveland Ave.~|~13 - Bridge Rehabilitation~|~AEEE747F9611A3B5181355F0C31DA2C8E29B6344 91761~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. GAL 775 4.74-4.75. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C4DB3774B249D421BD98919EFED01893505CA854 91761~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment. NHS route funded 80 federal/20 state.~|~17 - Construction Engineering~|~160C482E984A357A0F800BB450A081BE28ACF2E9 91761~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~218A15E3DDB4594C045D5573379540EFBA80566B 124427~|~1~|~1~|~01/MPO~|~Federal items.~|~05 - 4R Maintenance - Resurfacing~|~4EC662A899D0E28ABA32D9BE8CB5A12A5BC0302B 111157~|~1~|~1~|~01/SAE~|~Split for safety upgrading of Type A anchor assemblies~|~21 - Safety~|~8B575A7EB8E4222ACB206AECA73ADC3FF12A3EFD 126082~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~293130DB4A6FA9F362C253E8128BD3271480E431 100181~|~1~|~1~|~01/NHS~|~Work on North Main Street from Trenton to Bigelow. 80% federal funds from the City of Findlay large city budget with the 20% match provided being local funds provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~39177E2B04B860AB0A69F3ABABEFFE5E00625A3D 100181~|~1~|~2~|~02/S<2~|~Work on Trenton from Main to Blanchard. 80% federal funds from the City of Findlay large city budget with the 20% match being local funds provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~7E91199BD11FB24BE3F7820961EEB244A726465A 98276~|~1~|~1~|~01/NHS~|~Reactive Pavement Maintenance / GAP Project~|~44 - Other~|~6CC7F58228628960E6392990F6053841DF2DB1FB 101969~|~1~|~1~|~01/SAF~|~Apply rumble stripes to VIN 93 9.52-17.52. 100% State safety funds.~|~21 - Safety~|~45CB5C2B0C4CC276A3BFB7E44A6782283D6AF0AA 93501~|~1~|~6~|~06/IMS~|~Re-Deck of two structures in Medina County. MED-IR76-11.43 (L&R).~|~13 - Bridge Rehabilitation~|~0575F443DC55993A7196489DAAC0D85C988ED495 93501~|~1~|~5~|~05/IMS~|~Overhead D4 structures, see linked bridges.~|~13 - Bridge Rehabilitation~|~B37BE1E09EAB9391A7FE38D6A98360ABD01E5FDB 93501~|~1~|~4~|~04/IMS~|~Mainline D4 structures, widening portion, see linked bridges.~|~10 - Bridge Replacement~|~57847AE387F7FA6B3141054B531BC7A35259AE2E 93501~|~1~|~7~|~07/IMS~|~Replacement of of Cleveland Massillon Road structure (SFN#7705077) over IR76 in the City of Norton, Summit County, Ohio.~|~10 - Bridge Replacement~|~53145CA19F70AEA81869EC70648DE722C7EC9032 93501~|~1~|~2~|~02/IMS~|~Additional Capacity associated with the reconstruction of IR-76 from Medina County line to SR-619 (Wooster Road). Minor bridge work on SFN# 7705018.~|~03 - Reconstruction - Added Capacity~|~8E3CF7B1A51AABE081BC8FE20FC015EB2B865ED3 93501~|~1~|~1~|~01/IMS~|~Reconstruction of four current lanes of IR-76 from Medina County line to SR-619 (Wooster Road). Minor bridge work to SFN# 7704895.~|~04 - Reconstruction - No Added Capacity~|~254E9403FEEACB3D128FBD1788C8FAF951245B2D 93501~|~1~|~8~|~08/IMS~|~Construction of camera's at Cleveland Massillon, Clark Mill and Barber Road.~|~04 - Reconstruction - No Added Capacity~|~49B406ED7A89D3292B3C6BDB9B77F5B071B13FCC 93501~|~1~|~3~|~03/IMS~|~Mainline D4 structures, reconstruction portion, see linked bridges.~|~10 - Bridge Replacement~|~464DDA5C710A6EDACD0BE38A983DC8E12123DB9E 114153~|~1~|~1~|~01/NFA~|~Minor repairs and resurfacing of beach parking lots~|~05 - 4R Maintenance - Resurfacing~|~901E84E9DA15D60E6A3C6AD0987FEA2F71F7DED6 124997~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP Rural roadway~|~05 - 4R Maintenance - Resurfacing~|~C2FB1C9CDD37868DCBF60C345132AC813995C745 121288~|~1~|~1~|~01/STR~|~Culvert replacement project on GAL325 16.16, CFN 1829887 and pave culvert invert on MEG 325 1.76, CFN 1824844.~|~~|~D2A35783F6CFE4817797FEC8260FFDB92CEB5D34 123822~|~1~|~1~|~01/IMS~|~Bridge Hit repairs Type 2 Emergency~|~13 - Bridge Rehabilitation~|~7B315DC93EF119A347C5965DEDEAA8A41DB7191E 97612~|~1~|~1~|~01/NHS~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7~|~04 - Reconstruction - No Added Capacity~|~F5355BF534783545B55DD6BBC57843BF8B137DDA 93769~|~1~|~1~|~01/STR~|~Reface abutments using anodes and pier piling encasements on SFN 0600725 AUG SR 65 1319 Auglaize River.~|~13 - Bridge Rehabilitation~|~3DBE446A9C5560237F48A68157D811B5CCF5B7EF 102831~|~1~|~1~|~01/IMS~|~This plan split is for Interstate signal work.~|~21 - Safety~|~9411A35A5BBACF78B6905EBD8674AA54E8B7CCFC 107496~|~1~|~1~|~01/STR~|~Resurfacing COL-39~|~05 - 4R Maintenance - Resurfacing~|~04A61EA5533C8B2C8730DED9E35CB83E2BD20BDA 102366~|~1~|~1~|~01/NFP~|~Split for crack sealing~|~99 - State Preventative Maintenance~|~F3388F45E368F3D73260ED74F91EEFBE24363628 105733~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7.~|~44 - Other~|~3A47F96DD80B408A14D8390663797284C20C462E 115745~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 (ODOT/City) portion of the urban paving resurfacing on GRE-42. ~|~05 - 4R Maintenance - Resurfacing~|~1F1A2663E37E751FCEF9C4EF28D58BC1C86BE1D8 115745~|~1~|~2~|~02/NHS/XEN~|~Plan Split for the 100% Local funded items on resurfacing GRE-42~|~05 - 4R Maintenance - Resurfacing~|~6AA72A2668C04F4B66AEC5154B234C041D339D49 106223~|~1~|~1~|~01/CMQ~|~Bikepath Connector in the City of Franklin.~|~28 - Facilities for Pedestrians & Bicycles~|~8D70F73D076261E81EF9CA203E2E0AE9CC7A04C9 107843~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 83 0.40-0.44. DSR WAS-001. Rural other federal aid funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~02D18AE221EEE77F691C8A31B438AD4AEEADBA9C 117582~|~1~|~1~|~01/NFP~|~Resurfacing campgrounds in Caesar Creek State Park~|~05 - 4R Maintenance - Resurfacing~|~6DB4B6104A6844EFE2F31979B4468496114CBEBE 92749~|~1~|~1~|~01/STR~|~7203152 SAN SR510 4.12 Intersect: Little Raccoon Creek~|~17 - Construction Engineering~|~ED547C53C25500C5369BF062224161E4E2DD31C2 110641~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 in Defiance County from the Paulding County line at 0.00 to the Defiance Urban Area Boundary at Watson Road at 2.01. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~38037BE0DFA99AC3B28CA7D4000FA05E9231EA3F 110641~|~1~|~4~|~04/S5K/DEFI~|~100% city costs.~|~05 - 4R Maintenance - Resurfacing~|~FD8247D82C3ED6D5BE52B043B5F791A45792F7A8 110641~|~1~|~2~|~02/S5K~|~Resurfacing on SR 66 inside the Defiance Urban Area but outside of the City of Defiance. Work on both sides of the road from the Defiance Urban Area boundary at Watson Road at 2.01 to where SR 66 enters the City of Defiance on the right side at 2.20 and then on the left side to where SR 66 on the left side until it enters the the City of Defiance at 3.05. The work also includes work on the right side of SR 66 from where it leaves the City of Defiance at 2.31 until it enters the City of Defiance at 2.39. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~94F614FC497208B5E2BB714F3E3CA76B4DF86D5A 110641~|~1~|~3~|~03/S5K/DEF~|~Resurfacing on SR 66 in the City of Defiance. Work on SR 66 from where it enters the City of Defiance on the right side at 2.20 until it leaves the City of Defiance at 2.31 and again on the right side of the road from where it reenters the City on the right side at 2.39 to where SR 66 enters the City of the left side at 3.05 and then on both sides of the road from 3.05 to the end of the work at 3.39. Federal funds from the District Preservation Program budget with the non-federal match provided by the City of Defiance.~|~05 - 4R Maintenance - Resurfacing~|~DF796EFF7094A2A4575858C7530E669DD2E9F791 111164~|~1~|~1~|~01/NFP~|~Resurfacing at Delaware Alum Creek State Park~|~05 - 4R Maintenance - Resurfacing~|~1AED965B2BBC0390B3F5247C84CC631E2BC53F84 8809~|~1~|~1~|~01/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of 6000428 MUS US22 9.95 Intersect: Ditch #; Not BR Eligible for Rehabilitation: Length=15 SD/FO(2) SR=31.8 DSR=5~|~10 - Bridge Replacement~|~56BBCF28FA493F66D796D263B2BBCBC5F4A1CBCF 108730~|~1~|~1~|~01/NHS~|~Erosion repair project and unplug drainage structures. ATH 33 2.43-2.45 and 4.20-4.40. Funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~40A81A76A8691B67BB91BA1EBE4EED564307AD12 101207~|~2~|~2~|~02/NHS~|~AC overlay or fine graded polymer AC overlay on DEL-23-20.85-21.53, MAR-4-7.93-8.34, MAR-23-0.00-2.41~|~05 - 4R Maintenance - Resurfacing~|~32C1462D7634C62E7BB5F44C8A8BA51D8A894380 101207~|~1~|~3~|~03/S<2~|~AC overlay or fine graded polymer AC overlay on MAR-4-5.72-7.93, MAR-98-9.68-10.96~|~05 - 4R Maintenance - Resurfacing~|~115112B82C66D6FD336F9683009A0182310D0839 101207~|~1~|~1~|~01/STR~|~AC overlay or fine graded polymer AC overlay on DEL-203-0.06-9.10, MAR-4-1.79-5.72, MAR-47-0.62-2.09, MAR-98-0.00-9.68, MAR-98-10.96-17.17, MAR-203-0.00-0.43.~|~05 - 4R Maintenance - Resurfacing~|~A5EED3C893B714B637085CDB1C9BFB8EA8E4D147 101172~|~1~|~1~|~01/IMS~|~Concrete pavement repair~|~05 - 4R Maintenance - Resurfacing~|~648327E9B2A1C7A29800A77415EBB3ED1817CD9D 103118~|~1~|~1~|~01/NFP~|~Pavement grinding at the IR 270/Roberts Rd interchange~|~44 - Other~|~BE52CA22CDCA51820E52E07446BE202CE9F8B14D 117163~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - replacement of KNO-362-0.12 (SFN 4235525) structure.~|~10 - Bridge Replacement~|~30BE89756C8B66A49BE5E4899465FA854C80CD58 120946~|~1~|~1~|~01/BRO~|~All work included in this split~|~13 - Bridge Rehabilitation~|~9855C248EBAF7E859D842EE55E53C57F13B96B62 97491~|~1~|~1~|~01/BRO~|~Replace structure CAR-542-0573 (SFN 1001868) with a new structure.~|~10 - Bridge Replacement~|~565123A5F6A400F462B4492CAB10D7309227520D 116784~|~1~|~1~|~01/IMS~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~083FE826939645B59D15918FF9406C47B70E254E 101280~|~1~|~1~|~01/STR~|~SEN-12 from SLM 3.988 to 13.085~|~05 - 4R Maintenance - Resurfacing~|~B4CD862EC14E39485AE479B0AACFA97E5A4A5F8E 101280~|~1~|~4~|~04/NHS~|~100% Local aspects of Urban Paving Scope - US-23 from SLM 9.98-11.88~|~05 - 4R Maintenance - Resurfacing~|~BCB1006A08AF74312354B97ADD73E28056D1B0AE 101280~|~1~|~3~|~03/NHS~|~Urban Paving F/L Plan Split - US-23 from SLM 9.98-11.88~|~05 - 4R Maintenance - Resurfacing~|~C5E9377AD4478BECDF2BB17E6B78BEA2A68F5442 101280~|~1~|~2~|~02/S5K~|~Resurfacing on SR 12 from SLM 3.47 to 3.988~|~05 - 4R Maintenance - Resurfacing~|~399339CB0E2A7ABD3FC739951F996185F876AC90 104742~|~1~|~1~|~01/NHS~|~Culvert replacement on LAW 52 21.44~|~04 - Reconstruction - No Added Capacity~|~9013282BAACF376A210F2EEB89D0B5E3D4900AFB 120190~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B1012E9276EE980C38C93DC2CF76007AC05D89EE 120190~|~1~|~2~|~02/S>2~|~Driveway work - City of Clayton responsible for funding~|~05 - 4R Maintenance - Resurfacing~|~0CDE1BE06885470D09A1036636A1D0FC19457279 83407~|~1~|~1~|~01/CMQ~|~CMAQ Plan Split for TRU Western Reserve Greenway (Bike Trail) Phase 3~|~28 - Facilities for Pedestrians & Bicycles~|~73D06748CE794D0A38F901796643692CB59A1DF8 99533~|~1~|~1~|~01/ENH~|~Extend Olengtangy Trail Bikeway~|~28 - Facilities for Pedestrians & Bicycles~|~C658CFA7D0F2F1A1D41248D39EDAF4E9A88ABD2C 92454~|~1~|~1~|~01/S<2~|~Replace culvert between US 62 and Darby Crk Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F7251906ACE57E3906C40C27407AFF88455C07A 125681~|~1~|~1~|~01/IMS~|~Plan split to reconstruct the existing pavement~|~04 - Reconstruction - No Added Capacity~|~5F6199DAF6CC6C41836774F11E7526BC192A6837 125681~|~1~|~2~|~02/IMS~|~Plan split to add a new lane on PRE-70~|~03 - Reconstruction - Added Capacity~|~DD0C63CA5EF3581A8029ED3262C7D6A614CDD151 125681~|~1~|~3~|~03/IMS~|~plan split for bridge work~|~13 - Bridge Rehabilitation~|~3DD711C1E3A24AEE22F0E94A76D6B844A532526C 107220~|~1~|~1~|~01/NFA~|~The City will reconstruct and widen 1500 lineal feet of Agnes St from SR 15 west to Karnes Ave.~|~01 - New Construction~|~487C9DEB92EBDC7682D19B4C01825FFE7C42A2D0 90120~|~1~|~1~|~01/BRO~|~4808169 LUC IR475 12.83 Intersect: Woodley Road~|~13 - Bridge Rehabilitation~|~6A4D28BDE9ECAE0C9AABFE5AB87E2A96D1A23CF3 121259~|~1~|~1~|~01/NFP~|~added HS plan split.~|~44 - Other~|~AB666483FFE6EAE38E0672DD12B65437641F2C9C 124413~|~1~|~1~|~01/SAF~|~All roundabout work included in this split.~|~21 - Safety~|~8B161A9031E467B3216684DB7C985862A8D1BC56 111528~|~1~|~1~|~01/MPO~|~MPO Funded items~|~05 - 4R Maintenance - Resurfacing~|~F47951AEA15359A817C049C4965E79C762CE906C 107493~|~1~|~1~|~01/CMQ~|~Plan split~|~17 - Construction Engineering~|~3034984D76826BCE7CDD05287719E44F8A8A6F49 78257~|~1~|~1~|~01/NHS~|~minor rehab of TUS-250-12.79 to 17.32; includes pavement, pavement repair, profile correction under bridge, pavement marking~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B880553AEEFC99F5DB4C59478274F402528E5D5D 84112~|~1~|~1~|~01/MPO~|~CMAQ and TAP funds for all eligible work on this project.~|~28 - Facilities for Pedestrians & Bicycles~|~4AE8DBC18E738680F6C7BE928C9CAB0C33164473 108271~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER Event. DSR# BEL-016.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EF6CBEF9B2DEE0D06DA07EC559B393335727BAE8 101419~|~1~|~1~|~01/S>2~|~FY2019 Urban Paving Project in the City of Milford. This plan split is for SR 126 where the pay items are split 80% State and 20% City between SLM 25.41 - 25.88.~|~05 - 4R Maintenance - Resurfacing~|~2BD90288C84B04584B81F9336FDAD9542D2B468D 101419~|~1~|~2~|~02/S>2~|~FY2019 Urban Paving Project in the City of Milford. This plan split is for SR 126 where the pay items are 100% City costs between SLM 25.41 - 25.88.~|~05 - 4R Maintenance - Resurfacing~|~EDAFC7EBFF3B714A475300E25A3F25172616E2C7 121494~|~1~|~1~|~01/NHS~|~Bridge replacement.~|~10 - Bridge Replacement~|~10C0E6D48D6A1194CC01B40BA824FD76C4F6EA06 117133~|~1~|~1~|~01/MPO/GCEO~|~Resurfacing of Dayton-Yellow Springs Road from the eastern Fairborn corp. limit to the western Yellow Springs corp. limit.~|~04 - Reconstruction - No Added Capacity~|~52ED88138CBC8355B258F307F9DA3CA196B9B84F 118552~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay. MEG-7-18.62-22.80-23.99 and ATH 7 0.00-1.36. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~50B214CC77D47ADF523DB2C8025296A52F10A646 125290~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 39 over Brandywine Creek.~|~04 - Reconstruction - No Added Capacity~|~AB9A2CC8E56B9CC742AD4AC7DBB55C4573F1DC03 123571~|~1~|~1~|~01/SAF~|~District wide lighting replacements. Locations TBD~|~21 - Safety~|~9AD183832E6B72EC0C21DABB6868CBCA1629214E 106643~|~1~|~1~|~01/ENH~|~Construction of the Meigs Middleport multi-use trail. Funded 95 federal/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~46AA73C9ADA8323A01BBEB874484E4E8884191FC 93647~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~09952F9035035DB816C279DF971CF3DC4FA67781 102032~|~1~|~2~|~02/NHS~|~Split for resurfacing; Lump Sum $400,000 for ODOT section paid with 80% Fed/20% St - District allocation (SLM 10.33 to 10.93 ) then 100% City for paving the rest of SR 51 ( Monroe St)~|~05 - 4R Maintenance - Resurfacing~|~F0EBF5CD70354167CFEA20EEB89EBB16B34A7311 102032~|~1~|~1~|~01/SAF~|~Safety split for intersections on Monroe St (SR-51) at Secor Rd, East Mall Drive and Tallmadge~|~21 - Safety~|~3F2C0BB2590BE3269C690766C7C3476A6A84FD87 107692~|~1~|~1~|~01/NHS~|~HEN-6-5.37~|~10 - Bridge Replacement~|~187278FC8A0B30298ECDD8744098F09956961E0A 121674~|~1~|~1~|~01/IMS~|~FRA-270-43.632R and FRA-270-43.724L over Big Walnut Creek & Noe Bixby Rd replace bridges~|~10 - Bridge Replacement~|~51CEE8FD98BE263551027683E3300636070D61AE 123759~|~1~|~1~|~01/IMS~|~Plan split for sign replacements on IR-280~|~21 - Safety~|~A16F60A207A6F8D9401EFB239165BD4FAB99961A 102442~|~1~|~1~|~01/STR~|~BRO 50 3.95 Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~FCAD37134D4AAF87D934EA04D505A2BD3F35E4D5 110212~|~1~|~1~|~01/NFP~|~Plan split for Shoulder work~|~05 - 4R Maintenance - Resurfacing~|~C83834CFF2F2C81E93C03271CA439A7294288BB6 127007~|~1~|~1~|~01/NFP~|~Safety Signage~|~21 - Safety~|~40183D56CBBFC1DC21B6347AE01274FC93EAD12A 92003~|~1~|~4~|~04/S<2~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. Brdgs F/Rehab:7303017 SCI SR73 25.68 Intersect: Scioto River80/20 split01/S<2/BR/State~|~13 - Bridge Rehabilitation~|~13D95739366CF77F966660ECFAAABB71A85EB565 92003~|~1~|~2~|~02/STR~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. Brdgs F/Rehab:7302827 SCI SR73 22.41 Intersect: Dry Run80/20 split01/STR/BR/State~|~13 - Bridge Rehabilitation~|~1E5A12C10FB53EA3961214E7B254D6CD60242186 92003~|~1~|~1~|~01/STR~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. Brdgs F/Pave Thru:7302797 SCI SR73 20.94 Intersect: Pond Creek80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~DBD76DF5AD9A0D27D4BE6F70DC85992C7EE44452 92003~|~1~|~3~|~03/S<2~|~SCI SR73 20.67 - 24.84 Resurfacing ProjectOn SR73, begin project 0.46 mile SE of SR104, then SE for 5.17 mile & terminate @ the east corp limit of the City of Portsmouth. 80/20 split01/S<2/PV/State~|~05 - 4R Maintenance - Resurfacing~|~F1E72487708B9640E01793141C3640BF4673871F 117678~|~1~|~1~|~01/SAF~|~Plan split for safety related items~|~21 - Safety~|~B0BB5FA31C3D02FE7BA98452A4743E69A4469986 117678~|~1~|~2~|~02/ENH~|~Plan Split for TAP funding to construct a Shared Use Path from Carronade Drive to Crossroads Parkway~|~28 - Facilities for Pedestrians & Bicycles~|~CD70C4904F694C7B05A85B8DB6E3685C09189457 117678~|~1~|~3~|~03/NFP~|~Plan Split for NWWSD funded utility work.~|~43 - Utilities~|~2B868092466D0C7CA6570F69933844F667B3E68E 101188~|~1~|~1~|~01/NHS~|~Seal bridge decks on Jefferson County SR 7 as part of preventative maintenance strategy.~|~47 - Bridge Preventive Maintenance~|~2586BE9CBDEE42F896462ABCEC65447F4D38384A 91177~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on US 68 in Urbana from Laurel/Oak (SLM 7.17) to the Urbana North Corporation Limit (SLM 8.65) - USR 68 from the south corporation limit (SLM 5.10) to 0.06 north of SR 55 (SLM 5.54)~|~05 - 4R Maintenance - Resurfacing~|~CC5DA0968347582ADF69CE6B0AF211C7604FAC76 120036~|~1~|~1~|~01/S5K~|~All work included in this split.~|~04 - Reconstruction - No Added Capacity~|~EDE15A9AD099E8C810556AC736C38F701A24DAF9 121457~|~1~|~1~|~01/CMQ/STOW~|~Signal replacements and upgrades.~|~21 - Safety~|~42C6DDB4DE5802AB8531A1BF6122F5B08690ED82 117872~|~1~|~1~|~01/BRO~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~C07BB16745243921A0C58B0DDC99E51368EF09E3 107514~|~1~|~1~|~01/STR~|~Resurfacing TUS-516~|~05 - 4R Maintenance - Resurfacing~|~4989968B82F855285717F8BBFEDA25EF72AC3A6D 87127~|~1~|~1~|~01/IMS~|~Interstate Bridge work~|~13 - Bridge Rehabilitation~|~6D52FFB32E6B6BFE034B8817EB1EC6320FB5FF90 87127~|~1~|~2~|~02/STR~|~STP Rural bridge work~|~13 - Bridge Rehabilitation~|~C77E3F3E316336600C281C0F19DEEEDEB6081DED 87127~|~1~|~3~|~03/S>2~|~Bridge work on Lrg. Urban bridges.~|~13 - Bridge Rehabilitation~|~8BA872B45589D965ED9C9E9A709D908B4CD8A714 87127~|~1~|~4~|~04/NHS~|~Bridge work on NHS bridges.~|~13 - Bridge Rehabilitation~|~710E3FA203495C88FAD4E9DA6CE97D2B19C4143E 112760~|~1~|~1~|~01/NHS~|~Bridge Painting.~|~13 - Bridge Rehabilitation~|~140AFA6F7D15EFC84F7D371ABD86F524D49BE43F 116940~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~E735C73FDE326C14CB77406D9205F9BA2F3FBA91 87184~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on a portion of IR 71 in Warren County; from SLM 0.00 to 15.14~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7071F977AC755CC981D7F08EA20F0AA749A23501 87184~|~1~|~2~|~02/IMS~|~Plan split includes work on the following structures: WAR-71-0144/8301743, WAR-71-0358E/8301859, WAR-71-0679L/8301980, WAR-71-0679R/8302014, WAR-71-0253/8301808, WAR-71-0657R/8301956, WAR-71-0657L/8301921, WAR-71-0169/8301778, This includes approach pavement work on overhead structures.~|~13 - Bridge Rehabilitation~|~206C82891FDE454FB458C35F90F032C32A9F4665 107470~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 from Brilliant to Steubenville~|~05 - 4R Maintenance - Resurfacing~|~958533A350834A6C574E12D381E454BA114069E8 83777~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 160 0.00-3.06. Urban other federal aid route funded Federal 80%, State 20%.~|~05 - 4R Maintenance - Resurfacing~|~16892BF00C1A2B1B9F00AB63B16FE0DE55951BC8 83777~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. GAL 35 13.42-17.79. NHS route funded Federal 80%, State 20%.~|~05 - 4R Maintenance - Resurfacing~|~D96C63CE9F502DD684F86A65142BAB87AE89E1B1 124259~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~51F9EA1D53CDEE48FF879D1D9C35AB686E3BBADE 87161~|~1~|~1~|~01/NHS~|~NHS Route BEL SR7 GSMP funds. Failed retaining wall. Remove failed wall and replace with new wall.~|~04 - Reconstruction - No Added Capacity~|~D096A5102219AE8A0C86E9E6870733C9AAD8A1E5 104094~|~1~|~1~|~01/IMS~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~2DDA83CCF73E5679755808D3D3A3AC874EF58784 104094~|~1~|~2~|~02/NFP~|~Retro fuel price adjustment~|~13 - Bridge Rehabilitation~|~FEC69B6A31409ABCB01B9BB139C20E42B194B9A6 104094~|~1~|~3~|~03/NFP~|~Split for Dominion EOG work at 100% local~|~13 - Bridge Rehabilitation~|~7A52DD582F0F2C2F06539FFCC8214B11DEC84AED 123718~|~1~|~2~|~02/S>2~|~Plan split for resurfacing STP Urban~|~05 - 4R Maintenance - Resurfacing~|~84060260B79E129F301139EADB67BEFF6712848C 123718~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP Rural~|~05 - 4R Maintenance - Resurfacing~|~1750DAC296B622F458580319EE8E043CF4350984 106786~|~1~|~1~|~01/S>2~|~Work to repair/resurface Coit Road from Kirby Ave to St. Clair Ave that is eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~296FCDC97C0686E62C13864F28A51D4BC4B48CA8 106786~|~1~|~2~|~02/NFP~|~Work to repair/resurface Coit Road from Kirby Ave to St. Clair Ave that is not eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~9CB49EFA4461DBB34F5F0A78FBE0F7C55C89DAA2 94827~|~1~|~1~|~01/NFP~|~Culvert Repairs - Paved Invert~|~44 - Other~|~AA849811E0DF8EBF07FCBD6DE0AC1745300D2ED6 106292~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties.~|~21 - Safety~|~E1FF267800D37F9FF4B9AE6AD152AC3B31FD3368 102793~|~1~|~1~|~01/IMS~|~This plan split is for work on Interstate bridges.~|~13 - Bridge Rehabilitation~|~3D7533F49E0CFB80D11A2A81F95CB50C069F25A0 110408~|~1~|~1~|~01/S>2~|~FY23 Urban Paving on SR 741 in the City of Mason.~|~05 - 4R Maintenance - Resurfacing~|~6012253C5EBE0042EC9095B4F980EC32C3D0F0FC 110408~|~1~|~2~|~02/S>2~|~This plan split is for all items paid 100% by the City.~|~05 - 4R Maintenance - Resurfacing~|~06D84E70ABA4F459F7179810500331E5865499BC 103923~|~1~|~1~|~01/STR~|~Culvert Repair: MED-303-13.90~|~04 - Reconstruction - No Added Capacity~|~0C82A7A7E9AD60538BE607E5C1FEE17A2B40000A 121279~|~1~|~1~|~01/IMS~|~Work on interstate bridges. Locations may be added as needs arise.~|~13 - Bridge Rehabilitation~|~ED17FAE534DA0C6CDED21FEDDCF32C73F6B2A7A6 116462~|~1~|~1~|~01/MPO/AKRO~|~Reconstruction of SUM SR 18 in the City of Akron.~|~~|~B77FEAF25A7AED11C346804093027B261FCD3F33 95411~|~1~|~1~|~01/MPO~|~Construct a multi-purpose trail along Fairhill Road from East 127th Street to the intersection of North Park Blvd and Coventry Rd using MPO Enhancement with 80% federal and 20% local participation.~|~28 - Facilities for Pedestrians & Bicycles~|~21E93393B6A406D66C5F13011CF7D03148E509E4 89708~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work using MPO Enhancement funds.~|~28 - Facilities for Pedestrians & Bicycles~|~9B0540C33F5E17E7933CF3AC2C95EF0B13923A26 110017~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~D7F254AAC82BD0A625DD9EACC90C6AE90E57B689 110017~|~1~|~2~|~02/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~B85996CC5D6D1AB0CC400EED463D5F098CF0BC2F 110017~|~1~|~3~|~03/S>2~|~Urban Area (STP>200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~475D2D2A70B069BE0DAAF4D6F099FEA567CE9E1C 110017~|~1~|~4~|~04/S<2~|~Urban Area (STP<200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~CFA64D914A167B6F61F1D225500B24BD513C531E 110017~|~1~|~5~|~05/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~5972B96D1F2F5BDBB05D1315B27F018AD202E9BB 104279~|~1~|~1~|~01/SAF~|~SYSSIGN~|~21 - Safety~|~4CB17B434F33E643DDAADF9018A15E454ABBE6A6 92375~|~1~|~1~|~01/STR~|~resurface WOO SR 65 5.89-11.43 - SR-235 to SR-64~|~05 - 4R Maintenance - Resurfacing~|~310A211EE46169A236EBF5240633752911B28C6B 122119~|~1~|~1~|~01/NHS~|~NHS plan split.~|~21 - Safety~|~9662FF348F00535EFEAB1689C636B064708EE11E 119443~|~1~|~1~|~01/IMS~|~Split for noise barrier replacement~|~20 - Environmental Only~|~0463AD3793A5710C7BBD4F60DD267135B8896348 99447~|~1~|~1~|~01/NFP~|~Roadway and parking lots in Olander Park.~|~05 - 4R Maintenance - Resurfacing~|~CE330B863FB8E5B36D2A5674225F939EC2EDCA20 101421~|~1~|~1~|~01/S<2~|~Plan Split for the 80/20 items on SR 134 and part of US 68Urban Paving.~|~05 - 4R Maintenance - Resurfacing~|~2FB6D2C03A45AB605022968D4CE864D7C96A4303 101421~|~1~|~2~|~02/S<2~|~Plan Split for the 100% City items on SR 134 and part of US 68Urban Paving.~|~05 - 4R Maintenance - Resurfacing~|~A14BE794C74AFF99754A06A0BC6263CB9BC34913 83984~|~1~|~2~|~02/STR~|~HEN-424 from SLM 12.33 to 14.53,~|~05 - 4R Maintenance - Resurfacing~|~64B706EE5C337A7D01AADC96502972304C6DAB1A 83984~|~1~|~3~|~03/BRO~|~Removal of abandoned RR bridge, SFN 3503690, HEN-424-10.27~|~13 - Bridge Rehabilitation~|~D3778CED4514C10B9A02ECE34F36FB6E2FD7455A 83984~|~1~|~1~|~01/NHS~|~LUC-24 from SLM 0.00 to 12.73 NHS (Rural & Urban)~|~05 - 4R Maintenance - Resurfacing~|~FD9262BA1583A5C075EDC95839EC8CA2EC6EE169 115528~|~1~|~1~|~01/NFA~|~Plan Split for J&C Funds~|~44 - Other~|~821A411D5BFE998B182708CE88DF96CD2370AC5A 85825~|~1~|~1~|~01/SAF~|~It is proposed to improve efficiency of major intersections, signalization system, turn lanes, and parking based on a comprehensive traffic flow study completed in Ironton. The proposed project will include signalization equipment replacement and upgrades, lane and parking reorganization, as well as turning lane improvements.~|~21 - Safety~|~8856D72DB24376E8434E25C8A5D71577BFFA1AB4 112994~|~1~|~1~|~01/NHS~|~LAW 52 5.00-11.75~|~05 - 4R Maintenance - Resurfacing~|~69886188DB9D44A65B07197041D188934E720B0F 112994~|~1~|~2~|~02/NHS~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~474DF608814C822411CB160BD73C3EFD6B6109DB 113445~|~1~|~1~|~01/IMS~|~Application of recessed and wet reflective markings to sections of interstate within D5.~|~21 - Safety~|~00E9DAABEA7DED4397591AC4EDE8E3EE532819C4 126791~|~1~|~1~|~01/STR~|~added per Chester.~|~04 - Reconstruction - No Added Capacity~|~EF5DB79D8C3449F2D238463F49C5831DD916D403 95413~|~1~|~1~|~01/SAF/JAC~|~It is proposed, using CEAO Safety Funds, to install new and upgrade existing pavement markings on various routes within Jackson County.100% Safety fundsFed Max $150,000~|~21 - Safety~|~554F7A2A78C65051A10BF53364FC7D972A33C6DA 101029~|~1~|~1~|~01/NHS~|~Systematic sign replacement on the NHS routes~|~21 - Safety~|~D760291304430B07FE60AF77CBC2961A16F21720 101029~|~1~|~2~|~02/S>2~|~Systematic sign upgrade on the large urban locations.~|~21 - Safety~|~289C314013B3104BDBD6FA750890BA01D6A92325 101029~|~1~|~3~|~03/STR~|~Systematic sign upgrade on the rural locations~|~21 - Safety~|~4EEE3B5CB4BE612D0767586D5632C54210B5B2B2 101029~|~1~|~4~|~04/IMS~|~This plan split includes all work associated with placing signs on several ramp locations along I-71, I-75, I-275, IR-74, and IR-471 in Hamilton County.~|~21 - Safety~|~DD070733B15FD22C8A9A86F37AD803BB9E4E45EE 81322~|~1~|~1~|~01/IMS~|~Construct an added fourth lane in each direction on Mainline IR 75 and correct a horizontal curve deficiency on Mainline IR 75. This is a continuation of the WAR 75 3.40 project ending 2,100 feet south of the Montgomery County Line On WAR MOT 75 from 11.80 SLM to 12.20;MOT IR 75 From 0.00 to 1.98.~|~03 - Reconstruction - Added Capacity~|~7B3A8A2EED720164B183CF9852412525A28A4C5B 101697~|~1~|~1~|~01/S50~|~Pavement: AC Overlay w/o Rpr: ERI SR 269 7.451 TO 7.504 ERI SR 269 7.319 TO 7.451 AC Overlay w/Rpr: ERI SR 269 7.955 TO 8.541 ERI SR 269 12.521 TO 12.690 Associate Add ~|~05 - 4R Maintenance - Resurfacing~|~9D8BEC4CE9FD05F97E278CBB72260A09E91BBEC6 101697~|~1~|~2~|~02/STR~|~Pavement: AC Overlay w/o Rpr: ERI SR 269 04.262 TO 7.319 AC Overlay w/Rpr: ERI SR 269 08.541 TO 8.555 ERI SR 269 11.315 TO 12.521~|~05 - 4R Maintenance - Resurfacing~|~FB285F9709A714FA9F0D2E5E283342C0033EC248 101697~|~1~|~3~|~03/NHS~|~Bridge: ERI SR 002 1.830 SFN 2204053: Preventive Maintenance Deck Sealing (051) Reactive Maintenance Exp jt repair/repl (048) Deck patching(conc) (049) Minor Rehabilitation Conc patching (non-deck) (010)~|~13 - Bridge Rehabilitation~|~EB782E2C2C102D685B86AE907E3C78CD67CFA9F3 101697~|~1~|~4~|~04/S50~|~Bridge: ERI SR 269 8.035 SFN 2203987: Preventive Maintenance Deck Sealing (051) Reactive Maintenance Exp jt repair/repl (048) Deck patching(conc) (049)~|~13 - Bridge Rehabilitation~|~27AFDD9CC50EA3E5077796FB70CC3425E62EF809 101697~|~1~|~5~|~05/SAF~|~Centerline rumble stripes on SR-269-4.26-7.32~|~21 - Safety~|~31A7D422D4F89CD9B809785724D4A7D48F62F4C9 91664~|~1~|~2~|~02/SAF~|~Safety/4BC7 $'s for signal work at 23/750~|~21 - Safety~|~0E2532D6DD32BA89DB27FDEC5EEE36FECE90503D 91664~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint funding for 1 yr Elec Maint contract~|~44 - Other~|~89C243CCD1FA274AA6E76A32A4C9BC70D881A6AE 91664~|~1~|~3~|~03/S>2~|~Signalization work at SR750/Highmeadows Village Drive (reference PID 83722)~|~44 - Other~|~B098AE1E46452923DDE02FCA1306603BA5239023 105365~|~1~|~1~|~01/IMS~|~Resurface using Asphalt Concrete.~|~05 - 4R Maintenance - Resurfacing~|~D8483BA013D27F6933DEAF71F6BC1E8E3D367FEA 124518~|~1~|~1~|~01/S5K~|~Deck overlay~|~47 - Bridge Preventive Maintenance~|~9BB62CAFF787CBD38A288EAAA5D05C3737AF180D 95749~|~1~|~1~|~01/S<2~|~Planing and resurfacing of CR-46 (Lytle Five Points Road) from a point 80 feet east of SR-741 to 160 feet west of Sycamore Springs Drive. Base repairs as required, and replacement of damaged curb and gutter.~|~04 - Reconstruction - No Added Capacity~|~EF97B3A5ED9FFF8B6C24B899AF5F4FBCEEAD9EE6 82832~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. HOC 56 13.60-21.29 and VIN 56 0.00-8.28. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~3193E8FE9B5E725C45948AB00BAAEA8277E6094E 113286~|~1~|~1~|~01/NFP~|~All work in this project.~|~~|~3A34B2298018C40755BD6F0AC18FC922ED71C337 112747~|~1~|~2~|~02/IMS~|~All items of work associated with Bridges within the project limits.~|~47 - Bridge Preventive Maintenance~|~A29BAD56E40530C19223C367EB095E200E32D013 112747~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FAY-71-0.00-9.49~|~05 - 4R Maintenance - Resurfacing~|~086E859AD9C2A2DC48AC0A63D5C0716A8DACBAB6 112747~|~1~|~3~|~03/SAF~|~All items associated with the installation of Recessed Wet Reflective Pavement Markings; FAY-71-9.49 to MAD-71-3.99.~|~21 - Safety~|~AFC2BFA5E0FBD834AA5A43ED669A92E7177E89EB 112747~|~1~|~4~|~04/SAF~|~Install median cable barrier from FAY-71-0.00 to FAY-71-9.49~|~21 - Safety~|~109B22E8E4454634E683E0A38E6ED1DF5B74C242 125781~|~1~|~1~|~01/NHS~|~Replace existing sidehill bridge.~|~10 - Bridge Replacement~|~6DB7621E8BD1EEA19CB1620A06C1166147F1AA17 103234~|~1~|~1~|~01/NFA~|~TID is constructing the Social-Fosters Road Widening and Bridge Project including, but not limited to, roadwork improvements by widening of Social-Fosters Road to five lanes from Innovation Way to Columbia Road, including new bridge overpass at I-71, new roundabout at Innovation way, intersection/signal improvement at Columbia Road and five-foot wide sidewalk on the north side of the road between Innovation Way and Columbia Road.~|~01 - New Construction~|~9B462AF4B9E04513E508780CC02881AACEF7CB5A 116928~|~1~|~2~|~02/NHS~|~Bridge Patching NHS Non-Interstate~|~13 - Bridge Rehabilitation~|~2457300341549A353BAB5F3C4F78BF031B3B7C5D 116928~|~1~|~1~|~01/IMS~|~Patching on various bridges - Interstate~|~13 - Bridge Rehabilitation~|~642AE78D8F6625A40A817DD7D5E6728DCDD13022 98546~|~1~|~2~|~02/NFA~|~Funding split for all work associated with the CLE-232-0154 structure.~|~13 - Bridge Rehabilitation~|~4DF6035E03589C259E840A1AD422B3E6D5A26590 98546~|~1~|~1~|~01/NHS~|~Funding split for all costs associated with the CLE-52-12.89 structure replacement.~|~04 - Reconstruction - No Added Capacity~|~629AB288DF79C6024CDC34A3AD03783FE3BFE114 93388~|~1~|~1~|~01/NHS~|~Normal Project Participation to provide dilemma zone at signals. All on NHS route.~|~21 - Safety~|~723D846C3B3C4785BAC360A49C13179C2D19CD5F 120477~|~1~|~1~|~01/BRF~|~Bridge replacement under the Muni Bridge program.~|~10 - Bridge Replacement~|~886EF149B0AD187524741F4B25FB3D644ED7DD8F 100582~|~1~|~1~|~01/STR~|~SCI 104 (6.37-17.70)~|~05 - 4R Maintenance - Resurfacing~|~8BA957968F59568EEDC0E3EFBD1D7D68D2E047D2 120114~|~1~|~1~|~01/MPO~|~Work to be funded by the MPO capped amount~|~05 - 4R Maintenance - Resurfacing~|~24919270006550811D3DFA1F197CAFCF764840A4 106239~|~1~|~2~|~02/SAF~|~Split for the Wallings Rd bridge work over I-77 with Safety, system preservation, and local funds~|~13 - Bridge Rehabilitation~|~CE0ECD51C7CD8A48D808A7A3907D18FA79EBCB88 106239~|~1~|~1~|~01/SAF~|~Split for Wallings Rd pavement work using safety and local funding. ~|~04 - Reconstruction - No Added Capacity~|~CA3A9148DF96029EC2FBEB3F204E3A5271A59D58 106239~|~1~|~3~|~03/NFP~|~Split for Dominion East Ohio relocation on the bridge. ~|~05 - 4R Maintenance - Resurfacing~|~1B853006F0754521A9D411BBDAA269CE4E6018BD 122184~|~1~|~1~|~01/S5K~|~CEAO funded resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4BCA1FA263E12960972492176D1CD5A6CF69E054 93448~|~1~|~2~|~02/NHS~|~Structural steel bridge painting on: SFN 1202634 CLA 68 0716 Norfolk Southern RR~|~13 - Bridge Rehabilitation~|~66EB153F072A9F50DEB38ADCB91D18CBA828D572 93448~|~1~|~1~|~01/BRO~|~Structural steel bridge painting on: SFN 1202529 CLA 68 0664 (CR 333 Dayton-Springfield RD) SFN 1202642 CLA 68 0718 (Access Road)~|~13 - Bridge Rehabilitation~|~C2D43472720479E4BC14BC0043613002917A3BEF 111821~|~1~|~1~|~01/NFP~|~CUY - Secret Sauce~|~44 - Other~|~F71E86698A6DD48E5F43662E8F254052DDC9F15A 111821~|~1~|~2~|~02/NFP~|~CUY - Secret Sauce~|~~|~529E4919B2A3D8FB3693141B07D644A609E76BD6 91897~|~1~|~1~|~01/IMS~|~Spot paving repair at various locations on FRA IR 71 and IR 270~|~05 - 4R Maintenance - Resurfacing~|~39ADE98C1DAB6566CAA57BF256D1374100D49D37 122872~|~1~|~1~|~01/NFP~|~All work included in this split.~|~44 - Other~|~200B8B1628F5E52760CF8D0C4C5F49D134140E43 91743~|~1~|~1~|~01/SAE~|~100% federal HSIP funding~|~21 - Safety~|~D8DC72688316BD6199E4031550A75FBCF272C186 99454~|~1~|~1~|~01/IMS~|~Rockfall mitigation by installation of rockfall barrier.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB2550DADC8BCC531896BEEE90F007C34797A2DC 98614~|~1~|~1~|~01/S>2~|~Drainage and Guardrail improvements to Ravenna Warren Road in Braceville and Newton Townships in Trumbull County, Ohio. The proposed improvements will remedy localized flooding resulting from filled drainage pipes and will help reserve the pavements in the affected areas.~|~44 - Other~|~A40DF8DA0C4B6FBF037AE1D51074C1973CA050EA 115207~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~~|~E6FB7ED1BCA68807997CB6FE781AB2F458E73E6E 126005~|~1~|~1~|~01/IMS~|~FUNDING ESTIMATE MYWP FY28~|~05 - 4R Maintenance - Resurfacing~|~917A83D9991AF735C8882F7C838BFFBC976AC4B8 115530~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~43FEB037DD66DC6815D440D5A6189C713B53DB1A 99757~|~1~|~1~|~01/NFA~|~Bridge Replacement SFN 4631838~|~10 - Bridge Replacement~|~A50E8F2D30B0694C0D7577991F2A602098F5A422 119453~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~DB5BB6874AF8383AB35CF17C74A7D71195CB32E3 94670~|~1~|~1~|~01/IMS~|~Repair slip failure~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~65ECC5CBDC60C7F3638AB6C2FC00B5CF28446184 101170~|~1~|~2~|~02/NHS~|~Microsuface: CHP US 68 1.82 to 5.03~|~05 - 4R Maintenance - Resurfacing~|~A8CF0A3496329FFE236BF91A3A2BB0137345BB6D 101170~|~1~|~1~|~01/IMS~|~Double micro on Interstate route: CLA IR 70 SLM 20.85 to 25.11~|~05 - 4R Maintenance - Resurfacing~|~8C51A514F5EB74683369F73CEAD99909438E1242 123528~|~1~|~1~|~01/NFA~|~Major preventative Maintenance of Suspension Bridge Road bridge (SFN 3134202) under Local Major Bridge Program.~|~47 - Bridge Preventive Maintenance~|~762FFDA7E70A420D6359C1BDA79AAEDDB4FC82C1 124598~|~1~|~1~|~01/IMS~|~Repair damaged retaining wall~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~106E2550965E0187F25386C3EDFDFBDAFFF265E5 123425~|~1~|~1~|~01/NHS~|~Resurfacing US 30 and SR 39~|~05 - 4R Maintenance - Resurfacing~|~8ED77FADCFA8466361C5E3695AED05B9BEB59C82 87374~|~1~|~1~|~01/BRO~|~Replacing deficient deck with minimal approach work on Bridge SFN 5500893 MIA 48 0359 over Sotzing Ditch.~|~13 - Bridge Rehabilitation~|~832D32513D15A599140142E13A1786789B880DF2 102752~|~1~|~1~|~01/S>2/NILE~|~Resurfacing, urban paving in the City of Niles.~|~05 - 4R Maintenance - Resurfacing~|~66891230C69A50B6CC349F0EDEF6E684AAC8E71E 102752~|~1~|~3~|~03/S>2~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~102BAA19DFB8ADAAAB2C94BD7E650403993FC6E6 102752~|~1~|~2~|~02/S>2/NILE~|~100% Niles items including ADA curb ramps, full and partial depth pavement repairs and catch basin reconstruction.~|~04 - Reconstruction - No Added Capacity~|~BDDCEF2EC600DE6E9F50783BE55BD7F6E75405FF 118891~|~1~|~1~|~01/BRF/CANT~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~42DEF06805BF18DF39CC83DF7AF49087BB99C241 93826~|~1~|~1~|~01/STR~|~resf~|~05 - 4R Maintenance - Resurfacing~|~BC71E99E5DE7B27E4C0A45D8ED8B799ABE32F9DF 103195~|~1~|~1~|~01/IMS~|~Split for pavement markings on the interstate system~|~99 - State Preventative Maintenance~|~73C98B469DB7E692E864D79E15F5E3F889F78B17 103195~|~1~|~2~|~02/NHS~|~Split for work on the NHS routes.~|~99 - State Preventative Maintenance~|~433B6A9E962A28776AFB68BEDBF76E3D5A8231F3 103195~|~1~|~3~|~03/S>2~|~Split for work on the urban STP routes.~|~99 - State Preventative Maintenance~|~C66DE28B457066E9090F98DAC2AAFFE7A4557610 103195~|~1~|~4~|~04/STR~|~Split for work on the rural STP routes.~|~99 - State Preventative Maintenance~|~896A70544635BA711755BBEA1030F327D30E6D6B 90632~|~1~|~1~|~01/NFP~|~This is a guardrail contract using maintenance operating funds (4CP7) capped at $750,000. Any expenditures over that amount will use 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C8EEF2786CC5411CEA71834A43BF04B1F86F178 98366~|~1~|~1~|~01/MPO~|~Resurfacing East Mennonite Road from approx 2,500 ft East of Page Road to Aurora East Corp Line in the City of Aurora, includes some full depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~918668D49F3619F0A35DDC89FE518AD847CFF77B 115811~|~1~|~1~|~01/STR~|~D03 PR FY2023, 1 Year Contract.~|~44 - Other~|~9B15E15341BA9884C6EC9B9E1859255D6BDF32BD 120123~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~CF6F9C0D2769DE8291749B3E0CE8A93E9574357C 123543~|~1~|~1~|~01/NFP~|~plan split for PM ~|~21 - Safety~|~63F3623639B38FD0BCD2631C23D4B41067CEA385 90937~|~1~|~1~|~01/NFA~|~SIDEWALKS~|~28 - Facilities for Pedestrians & Bicycles~|~BB4C0A3D2ED2DBD960789A1A2B698534797D063C 107212~|~1~|~1~|~01/ENH~|~Sidewalk replacement along Harmon Ave in the City of Warren.~|~28 - Facilities for Pedestrians & Bicycles~|~09B73599E9016330B3A0D2A6012D0505F39BC3B5 107212~|~1~|~2~|~02/NFP/Warr~|~Resurfacing of Harmon Avenue in the City of Warren, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~B8A51BC4AE4E32F1CAF2C2F7E531F859512CFED0 97913~|~1~|~1~|~01/STR~|~Culvert replacement project. Work includes adding retaining walls. MOE-145-12.95 (CFN 1824660). Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~F8A4560E19514833A0E69D7C2E65E2D9DA7FAA7F 97913~|~1~|~2~|~02/S<2~|~Culvert replacement project. Work includes adding retaining walls. MOE-536-1.24 (CFN 1828270) and 1.36 (CFN 1824238). Urban other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~279D1DE613C835246B7AB82DACDD1FD9CB5D9D64 100624~|~1~|~2~|~02/NHS~|~Crack sealing for US 22 and SR 7 at Steubenville~|~99 - State Preventative Maintenance~|~63984FBAC3C4A67A6176BA88B615BAD52FCBFD38 100624~|~1~|~3~|~03/STR~|~Crack sealing SR 39~|~99 - State Preventative Maintenance~|~19D52FEC5C5B5CEB888CA99FF1DF93E76EBD5098 100624~|~1~|~1~|~01/IMS~|~Crack sealing of pavement within District 11 on interstate routes~|~99 - State Preventative Maintenance~|~37ABD203892E6079E9D326E6B43052713EA74732 109725~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~9C3C823C54AE4DD6EB9F746B5B4516ECD902D298 109725~|~1~|~2~|~02/S<2~|~AC overlay without repairs~|~17 - Construction Engineering~|~65380D6BDDAD6BBBBBFBAE7AD9FF4AD548DEE495 106817~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~F75FAAFFA27FCC7EBAA06A1B061BF7A2F7E895B2 117899~|~1~|~1~|~01/NFP~|~Added a split for non-federal bridge work ~|~47 - Bridge Preventive Maintenance~|~66380D1AE0AEC031ECAA3EAAC9B3D936F0A32258 119515~|~1~|~1~|~01/SAF~|~Safety Items~|~21 - Safety~|~66C5DCFA465EE1716572C5B5F9FDC25D19EFFFC0 95542~|~1~|~1~|~01/NHS~|~A new entrance to Terra Community College~|~01 - New Construction~|~47A3CD69956B1547564210213DE10A4F7EFE9926 95542~|~1~|~2~|~02/NHS~|~SFN 7200420~|~13 - Bridge Rehabilitation~|~DD5B676C594937CC6F28C40A173644E4169FB4DF 110042~|~1~|~1~|~01/NFA~|~Culvert replacement project. MOE 260 8.51, CFN 1863326. Funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~83B00AB49BC42ED27B344954F8A33D8EA0416DC0 110042~|~1~|~2~|~02/STR~|~Culvert replacement/repair project. NOB 147 6.39 (CFN 1800752), NOB 339 7.97 (CFN 1828548) and WAS 550 14.04 (CFN 1810146). Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~82DE9EBEEC24EFAB079D1E3403C8876CAD29A0BD 126694~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~6530D546E54AA83647D4E9842DF089B1F87619EE 104619~|~1~|~1~|~01/MPO~|~Resurfacing East Market Street from Main St to SR 82 Interchange.~|~05 - 4R Maintenance - Resurfacing~|~3AFC84A303AA12A18502450697910F711C027319 109187~|~1~|~1~|~01/NFP~|~Install new water line at the District Headquarters~|~44 - Other~|~5ABD89782EBEA4E7AB5260E4CAA529741889A6CC 117103~|~1~|~1~|~01/MPO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D5CE80F0EE114EA44EA45F5EFEF95CE205A0A738 86939~|~1~|~2~|~02/STR~|~Sealing SFN 7801483 TRU-SR 5-31.14 over Pymatuning Creek, SFN 7801505 TRU-SR 5-32.56 over Stratton Creek, SFN 7801521 TRU-SR 5-33.68 over Maple Creek, Asphalt Bridge Deck Overlay and Paint SFN 7805535 TRU-SR 87-15.15 over SR 11, Asphalt Bridge Deck Overlay SFN 7805551 TRU-SR 87-19.63 over Clear Creek, Concrete Bridge Deck Overlay, Concrete Patching and Painting of SFN 7805586 TRU-SR 87-20.63 over Pymatuning Creek.~|~13 - Bridge Rehabilitation~|~40CC7EB0123250805ACE0057AABAF24EE1BBA500 86939~|~1~|~1~|~01/STR~|~Resurfacing TRU-SR-5 from 30.96 to 35.52 and SR 5D from 0.00 to 0.06, TRU-SR-7 from 14.28 to 17.04, TRU-SR87 from 13.42 to 22.36. Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~5C1F4D52C63F9541E4EF1067BEF21ABA53CCEFF0 93753~|~1~|~1~|~01/STR~|~01/STR/BR ; HAR-53-1055, SFN 3300455; 80% Fed (4PF7) - 20% State (4PS7) - No Cap~|~13 - Bridge Rehabilitation~|~A3BA455F1E28006A72822BBCC1D63886B8D93AFA 111313~|~1~|~1~|~01/STR~|~ResurfacingADA CR 2 (4.39-6.23)ADA CR 10 (0.00-5.13)~|~05 - 4R Maintenance - Resurfacing~|~30286CC70633AE9764C03E7D51F82BF3039DA10A 98204~|~1~|~1~|~01/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on GUE-70-17.50 to 23.60 and GUE-70-25.30 to 28.48~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~195C0D7CC2D9F738EDF526F0B0B6EE6CECF9FF72 98204~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on LIC-16-24.58 to 28.70 and MUS-16-0.31 to 6.41~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~14D5A20996ED2271CE512BAE610E3E3178F041F0 98204~|~1~|~3~|~03/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban LIC-37-16.59 to 17.29 and MUS-40-5.10 to 9.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8FB83BEED02D246B3C5A4146DB06F5E648321F74 98204~|~1~|~4~|~04/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural LIC-40-28.58 to 29.93, LIC-40-29.93 to 30.14, LIC-37-17.29 to 24.42, MUS-40-0.00 to 1.08, and MUS-40-1.08 to 5.10~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6F52AB3ABDF5B3D668A90AA018938FAB170E77F 98204~|~1~|~5~|~05/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes in FAI-312-0.00 to 3.75, HOC-312-0.00 to 0.40, and PER-312-0.00 to 4.99~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~798EFC333A9D74B8C2D15B51BAE41DC966F12CA0 106343~|~1~|~1~|~01/NFA~|~Safety Assemblies, Coordinator, Crossing Guard Equipment, Incentives, Bike Helmets~|~~|~95BEFB8C220C40A5B97B4F82CA25F7986DE8AA9A 99583~|~1~|~1~|~01/NHS~|~Resurfacing using 80% federal and 20% state funds.~|~05 - 4R Maintenance - Resurfacing~|~A95CC47F125E9BB9433D37EB2A58EEC0473A0EC2 109065~|~1~|~1~|~01/NHS~|~District 5 Geological Site Management Funded Program - 80% Federal (4SF7) / 20% State (4SS7) - See CAP Comment - slide repair on GUE-22-14.60~|~44 - Other~|~1D7EC2BBB3C35A05F6A080FEACDB04A6D3CEE63B 105554~|~1~|~1~|~01/NHS~|~Highway Lighting~|~21 - Safety~|~28044434459DB6834856BEA5DF3B84CD3DC3EA7A 101543~|~1~|~1~|~01/BRF~|~CEAO funded bridge rehab.~|~13 - Bridge Rehabilitation~|~2B8F46C0A77D5296C19EBE9689AE4D783560DE0B 101543~|~1~|~2~|~02/BRF~|~Bridge Beam~|~~|~B36290F454E8CAFCCFC47DD708829A1A54BCF3C6 101543~|~1~|~3~|~03/BRF~|~Bridge Beam~|~13 - Bridge Rehabilitation~|~04EBB424832D9AC5056B0750E928E775A62D0BDC 110582~|~1~|~1~|~01/STR~|~MRW 95 and 95A within the Villages of Mt. Gilead and Edison~|~05 - 4R Maintenance - Resurfacing~|~4FC1390C5200A2A262E8C659BE2739DC1BAFACBC 110582~|~1~|~3~|~03/STR/EDIS~|~100% Local Items within the Village of Edison~|~05 - 4R Maintenance - Resurfacing~|~EC1B5CFC9A10A724A6886682E8EE9EB09129D7C8 110582~|~1~|~2~|~02/STR/MTGI~|~100% Local Items within Village of Mt. Gilead~|~05 - 4R Maintenance - Resurfacing~|~3E0D42C0055E80474C1E0935A947CE60F06180CE 90083~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/OT/KCEO" - County Engineer's Association Organization Pavement Marking 4HB7(100% Federal Safety Funding)- CAP of $750,000.00 federal - Pavement Marking on routes to be determined~|~21 - Safety~|~39E7B3553EC3A78CE6D4E63CEF787D2A805B6801 105068~|~1~|~1~|~01/NFA~|~plan split~|~10 - Bridge Replacement~|~BECD5586188726BA36872804231CDE8CDFAACCC0 84485~|~1~|~1~|~01/NHS~|~Plan split for all non-interstate work ON GRE-35~|~99 - State Preventative Maintenance~|~2E6E13A7097F97E59768F911F7131E1F6B17F6DD 84485~|~1~|~2~|~02/NHS~|~This plan split is for work on NHS bridge.~|~13 - Bridge Rehabilitation~|~E1A958C1398782364A13CB3775F2F7D1109FD2CF 121127~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~FD2F1759F8571C04B26E1463212B26A2FB542F5D 87469~|~1~|~1~|~01/IMS~|~100% state funding for all repair work. Locations TBD.~|~44 - Other~|~768843AAC285A3966C25A84322C0BDB60D6784C4 87469~|~1~|~2~|~02/IMS~|~Plan split for rail upgrading at 90/10 fed/state.~|~44 - Other~|~AD0D485439F085FC9A0717E09B972879C7486742 87469~|~1~|~3~|~03/STR~|~80/20 fed/state split for guardrail upgrade along SR-528 in Lake County~|~44 - Other~|~E8C6E7A96B15C7BDFE5CC6F7DCB8803CEA3EA9BA 99612~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~9D8CA247FC43D7E3E6DEA086AD3C573A4870A460 99920~|~1~|~1~|~01/STR~|~80% CEAO CSTP funding to resurface CR 35 and CR 137~|~05 - 4R Maintenance - Resurfacing~|~533D134A02F8206148EBBC6A34E4BD32C79FBC48 99920~|~1~|~2~|~02/STR~|~100% local items~|~05 - 4R Maintenance - Resurfacing~|~3E41D83C881D174D7E1241D2DE8FB862E78B5096 122471~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~A91E0D679D4C8AC17CD9D5D95F0DFA682340EB8C 94479~|~1~|~1~|~01/NFA/CJAC~|~On Harding Ave., in the City of Jackson, it is proposed, to replace the municpal bridge over Little Salt Creek.Municipal Brdg Program80% Fed/20% local match01/NFA/BR/CJAC~|~10 - Bridge Replacement~|~B36907838698FFBEFC62221395166D7E894BBCE0 84606~|~1~|~1~|~01/STR~|~Resurfacing of US322 from SLM 8.11 to SLM 17.47in Orwell, Colebrook, and Wayne townships, Ashtabula County, Ohio.~|~17 - Construction Engineering~|~91B85B298774EDAC9535A31F7E4266CF8A68D70B 84606~|~1~|~2~|~02/STR~|~Structure work, NOT BR eligible: SFN 0406325 9.66 US322 over Rock Creek.SFN 0406368 13.56 US322 over Mosquito Creek.SFN 0406392 13.99 US322 over Mosquito Creek.SFN 0406406 15.02 US322 over ATB SR11 2.49.SFN 0400718 18.10 SR7 over East Branch Ashtabula River.~|~13 - Bridge Rehabilitation~|~95D8E6ACE121A6D745D75306BBDCA82EAFE013EE 105464~|~1~|~1~|~01/IMS~|~Repair of two structures FRA-70-7.964 and FRA-71-21.901~|~13 - Bridge Rehabilitation~|~F4F58AB9E47ABD8309C3F4147A8B0FC68F094C64 105464~|~1~|~2~|~02/NHS~|~Repair of structure FAY-35-16.613~|~13 - Bridge Rehabilitation~|~D9E3243DA40058C373283992673628DB8B9EDCCD 121073~|~1~|~1~|~01/S5K~|~Resurfacing SR 170~|~05 - 4R Maintenance - Resurfacing~|~3C2851203A5754B55A31B1FBD690991EF3CD53BB 87371~|~1~|~1~|~01/BRF~|~Bridge replacement project. Work includes removal of superstructure and selective demolition of piers, abutments and substructure. Replacement to include widening to new standards. GAL CR 20 9.37 SFN 2734109. 80% Federal and 20% Local with some Credit Bridge.~|~10 - Bridge Replacement~|~DD5DB7F0A919186F11211E8877828C09696E3931 110557~|~1~|~1~|~01/STR~|~ROS-138-10.38 Bridge Replacement~|~10 - Bridge Replacement~|~5B41B4266D0302C8434FBD6694B184C325BAB7E2 124006~|~1~|~1~|~01/NFA~|~Created For J&C Involvement. ~|~44 - Other~|~4BC158923D5B3E48491DA65993B2829D5FADD76A 97366~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~04 - Reconstruction - No Added Capacity~|~8E4FCCF1ADF264E4BC4A9908072AD26EB63214F4 110156~|~1~|~1~|~01/STR~|~Bridge repair - bridge <20'~|~13 - Bridge Rehabilitation~|~4F07F464DA6CFD8014B1D8737A449323FB9065A3 110156~|~1~|~2~|~02/STR~|~Bridge repair - bridges >20'~|~13 - Bridge Rehabilitation~|~E0BE90AA68A40E883A91BC978EB49911E3262EA4 110156~|~1~|~3~|~03/IMS~|~Bridge repair~|~13 - Bridge Rehabilitation~|~4DE70B3421622459A0A65413167DB4F3DFA2F1B7 110156~|~1~|~4~|~04/NHS~|~Bridge repair.~|~13 - Bridge Rehabilitation~|~461FA79B84B905FB3388C202531277A9B9859605 98728~|~1~|~1~|~01/NHS~|~Guardrail replacement and signal coordination~|~05 - 4R Maintenance - Resurfacing~|~5AA375DFB8F6D3EEEDF0D218F621A2002E227568 98728~|~1~|~2~|~02/NHS~|~Pavement repair and resurfacing paid with local funds - City of Elyria~|~05 - 4R Maintenance - Resurfacing~|~B91BCF1314B133A06E42F6E2A43F5A253493680C 107804~|~1~|~1~|~01/STR~|~MAD-38-0.00 to 11.92~|~05 - 4R Maintenance - Resurfacing~|~5E76BE3FF605891FB29A85AE02FEBA218AB22B10 107804~|~1~|~2~|~02/S<2~|~MAD-38-11.92 to 12.41~|~05 - 4R Maintenance - Resurfacing~|~7444AAF13CD743D18A2B21EF6D2ACBC03F6DD0AD 107804~|~1~|~3~|~03/STR~|~Federal Bridges on MAD-38, SFNs: 4900251 and 4900324~|~47 - Bridge Preventive Maintenance~|~A7F926B88C344DA3DA4E889D15CD2E0DFF85FD2F 120211~|~1~|~1~|~01/MPO~|~SRTS items.~|~28 - Facilities for Pedestrians & Bicycles~|~87E616DE41FE78B3498825D3BE5F269C89988663 88919~|~1~|~1~|~01/BRO~|~Replace existing twin CMP pies (CAR-542-1060, SFN 1002015) with a four-sided box.~|~10 - Bridge Replacement~|~20E03D2F7BF7BFA034C0E5667CF14F4EAC94A32D 83959~|~1~|~1~|~01/STR~|~Construction of Plug pike wall to repair channel erosion at 8.73 mm to the slope~|~04 - Reconstruction - No Added Capacity~|~9584035BA111FF0CD920F174448862ACAFAE3F89 100757~|~1~|~1~|~01/STR~|~Resurfacing project on MEG SR 733 0.25-2.25 other Federal aid route Rural 80/20% Federal/State funds.~|~05 - 4R Maintenance - Resurfacing~|~8ECF2D08F887D50DEFA644F7FE15140C1287C1DF 111395~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~51E3FAF4BFEFECAC6FA00AB04F768AE9159C83B9 123193~|~1~|~1~|~01/STR~|~geotech plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~730D73EA0A313240F0E7416BFF7637CA868ED544 115100~|~1~|~1~|~01/S<2~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E8ACF0F7D4126C17FB4C9072F415338933310457 97985~|~1~|~1~|~01/IMS~|~Priority System minor rehabilitation of TUS-77 including asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~A1F368FBE496116279581235D959A42CFC245CB0 114073~|~1~|~1~|~01/SAF~|~Plan Split for federally eligible construction related expenses~|~21 - Safety~|~D4E1D1C491658C21EDD070A08B77D26DAE7D425B 106525~|~1~|~1~|~01/IMS~|~test~|~03 - Reconstruction - Added Capacity~|~AFBCAF135BB3FA345AC0D2B0D83CBC2BC39B3953 105651~|~1~|~1~|~01/NHS~|~NHS Non-Interstate Bryan Bridges. (HEN6-11.51 & 11.80)~|~13 - Bridge Rehabilitation~|~9708D306398DEA3B463A60DC395A4743C8C02A71 105651~|~1~|~2~|~02/NHS~|~NHS Rural Bridges HEN-6 16.49,16.78; HEN-24 11.39, 11.40, 12.89, 13.82, 13.83, 15.71, 15.72.~|~13 - Bridge Rehabilitation~|~A8430E3140A0D69C2720595184E6537EDBBA41D0 105651~|~1~|~3~|~03/STR~|~STP Rural FUL-20 2.53; HEN-18 13.86; HEN-65 1.35, 18.28; HEN-66 4.82; HEN-108 8.25, 8.74; WIL-2 11.82; WIL-15 0.13; WIL-34 26.60, 27.16; WIL-49 2.63, 20.02; WIL-107 8.02; WIL-576 2.08, 2.97, 11.80, 14.28.~|~13 - Bridge Rehabilitation~|~8B55E24A35D776DDF15620BFFFFA55EFC8399C6E 105651~|~1~|~4~|~04/S<2~|~STP<2k; Bryan bridges WIL-2 8.89 & WIL-34 15.67~|~13 - Bridge Rehabilitation~|~21F0AF7A365F0A751EE7AD188A21494862A7C23E 92805~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using asphalt overlay treatment on MRG 607 0.00-0.70 and 1.35-1.75. Not on federal aid, minor collector. 100% state funded.~|~05 - 4R Maintenance - Resurfacing~|~C61D96FCCBE8C0C90A8A92FC6BBB843B34741375 105005~|~1~|~1~|~01/MPO~|~Multi-Purpose Trail, NOACA funded~|~28 - Facilities for Pedestrians & Bicycles~|~B4CB0AB6D84817D6CD0F8F0A83FE2BEA671B9B2E 97192~|~1~|~1~|~01/NFP~|~Ohio's share of the spot painting project.~|~47 - Bridge Preventive Maintenance~|~619C75CA065D00834AE854D8357E9FFBE334E769 97192~|~1~|~2~|~02/NFP~|~KYTC's Share of the spot painting project.~|~47 - Bridge Preventive Maintenance~|~6B22233D93634DB42347781CFAFE700D0B484E09 97511~|~1~|~1~|~01/S<2~|~Bridge replacement project. HOC-MOHIO-20, SFN 3731057 (Ohio Avenue). CEAO funded. Funded 80 federal/20 local.~|~10 - Bridge Replacement~|~85B5130D9385B7C01669673C99DC96BD4BBA9512 120775~|~1~|~1~|~01/IMS~|~Bridge deck epoxy overlay~|~13 - Bridge Rehabilitation~|~D66A413E9965A81BF074E266FD7ADC14F46A9EFF 98547~|~1~|~1~|~01/NHS~|~All costs associated with structure HAM-42-1198~|~13 - Bridge Rehabilitation~|~F579EF5A62CAED844D9B575C4CEFB22FF70F4308 99413~|~1~|~1~|~01/STR~|~Resurface approx 6.5 miles of CR 4 from the Hopedale north corp to SR 646.~|~05 - 4R Maintenance - Resurfacing~|~B214B7631FEDD7D9A5FCC3FC1A03109DB1581A65 124605~|~1~|~1~|~01/SAF~|~safety funded roundabout work at WAR-22 & Clarksville and CLI-22 & SR-380/Creek Rd~|~21 - Safety~|~402125B96951D9AEA2AEA05FED996ACBC6EBBA13 111242~|~1~|~1~|~01/ENH~|~Funding to cover construction of bike trail~|~28 - Facilities for Pedestrians & Bicycles~|~6A5A088829B431E5672C0C3A0C8B85C3844957B9 123808~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~227F97A5432398545AAE6198C0D32C5492424E58 92364~|~1~|~1~|~01/NHS~|~resurface LUC SR 2 27.80 - 34.05 - N. Curtice Rd to Ottawa Co. Line~|~05 - 4R Maintenance - Resurfacing~|~01817787B223837E7EFDEC29A67F42123D55B599 124868~|~1~|~1~|~01/NFP~|~Districtwide systematic lighting upgrades and maintenance.~|~21 - Safety~|~8DA26C03B1927296B57EBC0D614B302D4FD53520 91579~|~1~|~1~|~01/BRO~|~Deck Replacement. 4402049 LAW SR140 0.82 Intersect: Hales Creek80 Fed/20 State. 01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~DB57090833600A92AA3059E63CC668B87DCB3EC7 111578~|~1~|~1~|~01/IMS~|~Noise wall maintenance.~|~44 - Other~|~F57D779B47B60BF8C77E66BD021321BF55FD7644 88316~|~1~|~1~|~01/CMQ~|~Project involves the widening of North Fairfield Road (CR-9) to three (3) lanes, the installation of curb and gutter, installation of storm sewer, and addition of a bikeway along the east side of the roadway.~|~04 - Reconstruction - No Added Capacity~|~54261E1F8D95E99D6B246ED2D5720142557E4B42 126442~|~1~|~1~|~01/NHS~|~Widening of SR 161 and SR 37 and bridge maintenance on existing structures.~|~03 - Reconstruction - Added Capacity~|~94678D9DAB1CFD4BC08CE9FA2B45AC911E6AAB20 93820~|~1~|~1~|~01/S>2~|~Resurfacing of North Main Street (SR91) in the City of Hudson from State Route 303 to Clinton/Aurora Streets.~|~05 - 4R Maintenance - Resurfacing~|~59E5B133A64EDEC979390619880DFD07A2B1B334 91549~|~1~|~1~|~01/STR~|~LAW SR243, SFN 4403606, 12.7980 Fed/20 State. BR funds eligible but only for rehab, not replacement. 01/STR/BR/State~|~10 - Bridge Replacement~|~CCBF1B214B2E067AC4282CF22EFC20F62B41D404 94308~|~1~|~1~|~01/SAE~|~100% SRTS funds used for pavement marking, sign, and sidewalk upgrades in the City of Cincinnati.~|~21 - Safety~|~8CFAB69C9B5D07E9801016B3ACC2F9E6014080C6 120039~|~1~|~1~|~01/S5K~|~All work included in this split.~|~21 - Safety~|~18E713BA2DA40438556EDA51934560159509DE0F 123918~|~1~|~1~|~01/NFP~|~Deck sealing~|~47 - Bridge Preventive Maintenance~|~07FAABC4AE9B9CABF6251B7FC8DFD0729A73CA29 106243~|~1~|~1~|~01/IMS~|~Resurfacing IR 270 from 18.37 to 21.67~|~05 - 4R Maintenance - Resurfacing~|~22F371A39D7D118B7088B9BE60F8AC21566ABF30 106243~|~1~|~3~|~03/IMS~|~Bridge repair to include deck patching, sealing and parapet repair~|~47 - Bridge Preventive Maintenance~|~F098050B6ED82BB7CF6809BB86B7D6EAA3E8F5C8 106243~|~2~|~2~|~02/IMS~|~Crack seal of FRA-270 from 17.10 to 18.35~|~05 - 4R Maintenance - Resurfacing~|~E4A9B1CACA87BFB2C248B9BF930D8F111E21A261 98071~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.56 to 5.47~|~05 - 4R Maintenance - Resurfacing~|~E0C07A80D6DE513941DFCD83C099864AFD9B7468 107516~|~1~|~1~|~01/S<2~|~Resurfacing COL-154 from SLM 3.84 to 5.63~|~05 - 4R Maintenance - Resurfacing~|~15CE0AE992B02AF8B3C5AC1C58A730CAF03660AE 107516~|~1~|~2~|~02/STR~|~Resurfacing COL-154 from 5.63 to 9.85~|~05 - 4R Maintenance - Resurfacing~|~968EDE2C9347DDB9F936F9B3EF7317C6DF7F7DAC 125478~|~1~|~1~|~01/MPO~|~upgrades to existing signal system along the State Route 63~|~21 - Safety~|~109FADED977A53662A29B1D5E218FFED4DFD78C6 25518~|~1~|~1~|~01/STR~|~WOO SR163 0-4.84~|~05 - 4R Maintenance - Resurfacing~|~9CC0ABB40BD15F9E701795D3379CB036929BF242 25518~|~1~|~2~|~02/STR~|~This plan split is for 2 bridges WOO-163-2.01 (SFN 8704988) and WOO-163-4.84 (8705070).~|~13 - Bridge Rehabilitation~|~D52AB3FEAA2B750078DD10EE876C56C341725908 115448~|~1~|~1~|~01/S>2~|~This plan split includes all work needed for the project description adding sidewalk on Kirby and school zone signage on US-42 and SR-561 at Woodward~|~28 - Facilities for Pedestrians & Bicycles~|~56511722EEDD7575D9AAFE51B73104861FAAC31C 94321~|~1~|~3~|~03/STR~|~Bridge on HEN-110 @ 4.81 (SFN 3503275)~|~13 - Bridge Rehabilitation~|~8B86543B9D69E43B4982290F2E633C31FA249FC9 94321~|~1~|~4~|~04/NHS~|~Hen 6 16.76 Bridge - SFN 3503240~|~47 - Bridge Preventive Maintenance~|~B78EF05CBD861DD4DA7675D0934420C6292BF1B8 94321~|~1~|~2~|~02/STR~|~From SLM 2.17 to SLM 5.20~|~05 - 4R Maintenance - Resurfacing~|~7F9EAE5627508DA5AFEFD39C099F42F428D4959E 94321~|~1~|~5~|~05/S5K~|~Urban Paving plan split SLM 0.30 to SLM 1.15~|~05 - 4R Maintenance - Resurfacing~|~F248A18EAD9620077B2817D91EF7F985C7507650 94321~|~1~|~1~|~01/S5K~|~From SLM 1.15 to SLM 2.17 (Napoleon)~|~05 - 4R Maintenance - Resurfacing~|~3316FC85CBA1055256A4D2FCC4EC5A202BA305E2 94321~|~1~|~6~|~06/S5K~|~Pavement Repairs from SLM 0.30 to SLM 1.15 - 100% Local~|~05 - 4R Maintenance - Resurfacing~|~8C7381A455E77B0BFB62302E0B33BDE95EE2E86F 99730~|~1~|~1~|~01/IMS~|~Work related to spot concrete pavement repair on FRA 270 and MAD 70.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3DD7B8F40D5253DC5549C8A42381351679570BC7 125922~|~1~|~1~|~01/NHS~|~All work on US 30 under NHS classification.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9773A1834D3599F88B149E1CC56BA7290DD23CF2 95491~|~1~|~1~|~01/SAF~|~Guardrail upgrade/installation on Nickle Plante Diagonal Road (CR 27) in LaGrange Twp and Carlisle Twp and on Gore Orphanage Road (CR 34) in Henrietta Twp.~|~21 - Safety~|~2FDD98F25D4CEA9884FBFAF1B7EEDD90E9EE2AEE 110595~|~1~|~1~|~01/S>2~|~Generic plan split for the centerline survey of no passing zones~|~~|~4A47883BD43B2FB0F61CF93FCB31F3B7AFCD47CF 110990~|~1~|~1~|~01/S>2/BREW~|~Construction of shared use path along STA US 62 in the Village of Brewster.~|~28 - Facilities for Pedestrians & Bicycles~|~BFFC6E9CE1E0EA895213C1D333EE6587491B556E 126504~|~1~|~1~|~01/NFP~|~Upgrade pavement markings~|~21 - Safety~|~2A061EB6FD07CA2910A61378B465715678901398 85840~|~1~|~1~|~01/MPO~|~LAW Ironton Delaware St. Improvements Project Description: It is proposed to add lighting, create crossings, and improve sidewalks because of more demand from a nearby school. KYOVA = 80% match Local (Iroton) = 20% match 01/MPO/OT/Ironton~|~21 - Safety~|~89F5A347884DABD8CB4F64E033D45BEDAA63100B 101076~|~1~|~1~|~01/IMS~|~RPMs~|~21 - Safety~|~38886699F2CBF7D5D72A95AF13648EEAF59D7734 96807~|~1~|~1~|~01/NHS~|~Pavement split for work on SR 317~|~03 - Reconstruction - Added Capacity~|~B064682FC2F1A5ACB1030917A318448486B92F6E 103255~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural route: CHP SR 54 SLM 1.70 to 8.28.CLA-41 SLM 0.00 to 3.61 - The work to be done on this section is to add edge line and center line rumble stripes and striping to this section ONLY~|~05 - 4R Maintenance - Resurfacing~|~6BA473A4A8872528FE67C7A25B940F247EA7CF12 104299~|~1~|~1~|~01/NHS~|~BRO 68 15.10 (SFN 0801534) Deck Replacement.~|~13 - Bridge Rehabilitation~|~27872A68FF7AD1FDE51593E5FC38DE1016EAEBA1 89910~|~1~|~1~|~01/SAE~|~Widen westbound SR-125 to provide a right turn lane at Bach Buxton; upgrade the traffic signal at SR-125 & Back Buxton, prepare capacity analysis to determine if an EB PROT-ONLY left can be provided at Bach Buxton, and provide dilemma zone detection at Bach Buxton and the Prive Drive signal to the east.~|~21 - Safety~|~42EC130A24356E0E8336EC6CBEBDADC33A063DE1 115651~|~1~|~1~|~01/ERD~|~Plan split using earmark funds along SR 57 corridor in the City of Orrville for eligible traffic control items in construction.~|~21 - Safety~|~D1B8DB167096E2D84BCD17FC8CD1613626F7AD41 121369~|~1~|~1~|~01/NFP~|~plan split.~|~44 - Other~|~566842FBA27EBF94BEA071D253410013825EB574 111166~|~1~|~1~|~01/NFP~|~Resurfacing at PIC Stage's Pond State Nature Preserve~|~05 - 4R Maintenance - Resurfacing~|~BFE50868EDEC6F473CE1D1128EA863F1C86EE7D6 83942~|~1~|~1~|~01/NFA~|~Resurfacing of CHP SR 245 from SLM 0.000 to 6.17 (segment length 6.17 total lane miles 12.34)~|~05 - 4R Maintenance - Resurfacing~|~1E942F62A67F70D0FC89FF7D2C885EB80558B067 83942~|~1~|~2~|~02/NFA~|~Remove wearing course surface and waterproof bridge deck with overlay asphalt, also replacing polymer joints on SFN 1102419 CHP 245 0138. Patch deck and approach joint on SFN 1102435 CHP 245 0403. Remove 1 1/2" asphalt and repave on SFN 1102486 CHP 245 0569.~|~13 - Bridge Rehabilitation~|~4EFD0728C20BCA9192787D4988C29C514D9A63BD 90818~|~1~|~1~|~01/ENH~|~80% MORPC Enh & 20% Columbus funding Construct sidewalks & bus shelter pads on Parsons from Obetz rd to Dering Ave~|~28 - Facilities for Pedestrians & Bicycles~|~8E7E04B450F302539A70C228390AC69C0890D34C 121014~|~1~|~1~|~01/SAF~|~Federally eligible items.~|~21 - Safety~|~249E6B0B0FDC8A7FDAA8D667433ACA26BB44796B 122854~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing around the Gilligan Complex and Brown Arena and pavement repairs under the Viaduct~|~05 - 4R Maintenance - Resurfacing~|~9949B5273613FBDFC2E126566034CE51314733A4 122854~|~1~|~2~|~02/NFA~|~PAVEMENT REPLACEMENT OF NORTH SIDE OF THE SOUTHERN PARKING LOT, NORTH SIDE OF THE NORTHERN PARKING LOT, SE SECTION OF HISTORY ST AND NE SECTION OF HISTORY ST AT THE OHIO HISTORY CONNECTION.~|~05 - 4R Maintenance - Resurfacing~|~7D4D6DBDE1E5BDCBC31134C16C10F18F5B640D78 114364~|~1~|~1~|~01/MPO~|~Resurfacing of Dressler Rd between SR 687 and Belden Village St.~|~05 - 4R Maintenance - Resurfacing~|~008C30E463932663878853E76AE4C86EB877EFB5 106346~|~1~|~1~|~01/SAF~|~Work funded with funds from the Safe Routes to School (SRTS) program.~|~28 - Facilities for Pedestrians & Bicycles~|~BFE78645EDA8DDB33766107221CE03618211B308 104036~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay. ATH 329 3.85 (SFN 0503428). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~23E4D9C94473096B6430DD9752DE99A27C3A23CF 104036~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. ATH 33 6.78 L (SFN 0500577), R (SFN 0500607), ATH 33 11.74 L (SFN 0505781). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~339005970090AD19D229EB00435D8860940A0A95 108076~|~1~|~1~|~01/STR~|~General split. Will add more descriptive splits once bridge locations are determined.~|~47 - Bridge Preventive Maintenance~|~94D0D9F01FE47882C928901C90F532346A363930 98030~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Fai-SR 256-(14.12-24.63) and Per-SR 256-(0.00-0.16)~|~05 - 4R Maintenance - Resurfacing~|~D8307501A5635D7A5C01A8C00ED1B81C16396B13 100785~|~1~|~1~|~01/NFP~|~Various routes.~|~05 - 4R Maintenance - Resurfacing~|~EA555D483CBEA1732A9DB2DC4D60F9616F774C56 114678~|~1~|~1~|~01/STR~|~Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run~|~13 - Bridge Rehabilitation~|~689D402154853A8FBB00801FD190B58B03A3161C 112250~|~1~|~1~|~01/IMS~|~General plan split added. Will add more specific ones once locations are determined.~|~05 - 4R Maintenance - Resurfacing~|~9B96923FD74BBE3FD72807122E2C31EEBCDF2AEF 105157~|~1~|~1~|~01/NFP~|~Work on various roads within Deer Creek State Park~|~05 - 4R Maintenance - Resurfacing~|~575D9A080CAB469D4D7750F4196C6B1941E26EE9 126217~|~1~|~1~|~01/S50~|~Replacement of Structure File Number 2231387 on ERI CR 0005 (Perkins Ave)~|~10 - Bridge Replacement~|~6CFFEEB87268D31597AE970497FFCBC6500A7F65 107282~|~1~|~1~|~01/S<2~|~ROS 207 0.00-2.56~|~05 - 4R Maintenance - Resurfacing~|~2E3329156B8A8810343C84E19A3120FE993E709F 114732~|~1~|~1~|~01/STR~|~FY25 Overlay~|~05 - 4R Maintenance - Resurfacing~|~F379AB3C7089099CEA218A9BE92E3CBC6D7029A4 109490~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~D4A9A7C4F2ACCE81D64F738DF3877F8063919160 108160~|~1~|~1~|~01/S>2~|~Replacement of the existing inadequate pedestrian bikeway bridge with an ADA accessible bridge located in a more scenic location.~|~10 - Bridge Replacement~|~2C7296AC9B07909E5AB052A98C2DB5A5165D0335 114127~|~1~|~1~|~01/IMS~|~Culvert rehab project using liner pipe. WAS 77 0.84 (CFN 1804980), WAS 77 4.36 (CFN 1839238) and WAS 77 4.55 (CFN 18050013).~|~04 - Reconstruction - No Added Capacity~|~FA095468ECCA358025802C23E629E2996705882B 109320~|~1~|~1~|~01/NFP~|~Baltimore OP Salt Storage~|~01 - New Construction~|~ECF2CC762966630007F0508FD005C028209C29E5 95626~|~1~|~1~|~01/NHS~|~Pavement items on US 33~|~03 - Reconstruction - Added Capacity~|~1AC15655CE5C9DC803D697F394BFC0C2CF60C2E5 101123~|~1~|~1~|~01/IMS~|~Overlay IR75 with asphalt concrete in Montgomery County: MOT IR 75 SLM 0.00 to 3.92~|~05 - 4R Maintenance - Resurfacing~|~4694361684B683112D66A63FEEBD32AC600F5654 124964~|~1~|~1~|~01/SAF~|~For TAP eligible expenses~|~~|~3B09F7DBC97875BB0209BA4EC54DB1AA7B3A8B7A 99081~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 2 lane highways - AUG/LOG/CHP/CLA.~|~44 - Other~|~7720F97BBDCCCEC6F9FF1E147E2EC0778092D3E1 125139~|~1~|~1~|~01/IMS~|~Plan split for all work on interstate and interstate ramps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1C7686CA63D5076DBD271571FD5F78F292D71649 125139~|~1~|~2~|~02/NHS~|~Plan split for all NHS routes and ramps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ED747B587227AB82290D686EF5F07E6703330C68 103067~|~1~|~1~|~01/NHS~|~Repair of one bridge in COL County (COL-7-0275, SFN 1500074) by replacing backwalls and approach slabs and three bridges in JEF County (JE-7-0066 SFN 4100026, JEF-7-0245 SFN 4100085, JEF-7-0288 SFN 4100115) by replacing approach slabs.~|~13 - Bridge Rehabilitation~|~B9EC1B1C23A38D51890D44F955AB4183760F2963 101385~|~1~|~1~|~01/BRO~|~01/BRO/BR/- District Preservation 4PF7/4PS7 (80/20) - No Cap~|~10 - Bridge Replacement~|~C3023E0ABA125B369BBCB7ABDE2EE1597982D8EA 97351~|~1~|~1~|~01/NFA~|~Task Order~|~~|~B73C766ED99244300C7916E1294A60E2E1771871 122589~|~1~|~1~|~01/ERD~|~Stabilize a landslide above the existing retaining wall on the west side of Columbia Parkway (US 50) 2,400 feet south of Beechmont Avenue. Stabilize a landslide above the existing retaining wall on the north side of Riverside Drive from approximately 750 feet east of Kemper Lane to the Rookwood rail overpass.~|~21 - Safety~|~FDBBE8F19F414AD6C2938877DB8F7CC83772ECB6 96473~|~1~|~1~|~01/NFP~|~Type B Emergency to repair bottom flange of fascia beam, two stiffners, and one crossframe for the HAM-275-1345 (SFN 3116468) structure.~|~44 - Other~|~DF63AF444609EB8C161106EEEE26697362A955C4 81705~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during project scoping.~|~13 - Bridge Rehabilitation~|~6B87FC3963953B4631B0B1DC98D33940B5CC8C04 104864~|~1~|~1~|~01/SAF~|~Round AboutLorain County using approved OPWC funds~|~21 - Safety~|~398A48DCA0ABA761CFC1C4E4B8B3BBF86127AD21 112549~|~1~|~1~|~01/MPO~|~AMATS funded resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8D2AE1E98057A9E0BDE9BF733D8E677FE1CDE289 100360~|~1~|~1~|~01/STR~|~Overlay SR 118 & SR 703 with asphalt concreteMER SR 118 3.91 - 7.88MER SR 703 8.92 - 11.13~|~05 - 4R Maintenance - Resurfacing~|~62DA49C4777AD448938D1AD23EA1C8FE0ABCA449 100360~|~1~|~2~|~02/S<2~|~Overlay SR 118 & SR 703 with asphalt concreteMER SR 118 7.88 - 8.34MER SR 703 6.48 - 8.92MER SR 703 11.13 - 11.23~|~05 - 4R Maintenance - Resurfacing~|~80F61D56870AE0CD253F3634470CAB0AE8947787 122508~|~1~|~1~|~01/S5K~|~Plan split for federally eligible work items being funded with Large City (Wooster) funds.~|~05 - 4R Maintenance - Resurfacing~|~B9D126F276C2E90F7876312ABFDEE1B191316B93 127290~|~1~|~1~|~01/SAF~|~Sidewalk project~|~28 - Facilities for Pedestrians & Bicycles~|~EFAA21512D0A5E17FDB3DD8A11D2DAE844AD55EB 86256~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split for all work using federal MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~67FF0D925AD8B7CFB32F4A042BC9C8655E8D831E 86256~|~1~|~2~|~02/NFA~|~100% local participation work items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~050975168296D9E9D4D89F05EABF13A409AB08A6 103175~|~1~|~1~|~01/S>2~|~Construct a separated bike path along the west side of street in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~33CC80EA44F8D6AEB4F736C4BB157C7AC5D5CF56 122006~|~1~|~2~|~02/S5K/LANC~|~Pedestrian Safety Improvements and related work along US 22/East Main Street in the City of Lancaster.~|~04 - Reconstruction - No Added Capacity~|~1B0CD53D7FFCAE39E8A22410837BB91F04A1CC78 122006~|~1~|~1~|~01/SAF/LANC~|~Pedestrian Safety Improvements and related work along US 22/East Main Street in the City of Lancaster. Systemic Safety funded 90% (4HJ7) Federal/10% (LNTP) Local match.~|~28 - Facilities for Pedestrians & Bicycles~|~B28854233F73B53DC6C2651D48233D0EDC620CBF 87363~|~1~|~1~|~01/NHS~|~Preventive Maintenance project using high density polystyrene to raise concrete. ATH 50 21.74-21.77, 23.86-23.90, MEG 33 0.21-0.25, 1.37-1.40, 13.58-13.60 WB only, 15.19-15.23, and 26.53-26.57. NHS route 80/20% Federal/State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3EA01AB237FEABE45D784AF6B24CEEC294D8920F 124613~|~1~|~1~|~01/S>2~|~Plan split for installing pavement markings for Locally sponsored project, road diet.~|~21 - Safety~|~B2DC55ACD380CE5B6D87E6EEF029A41FE71629E5 123241~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8D403FEFB011A1F7618E5C0C6E4F0E78AD08FE38 123241~|~1~|~2~|~02/BRO~|~Bridge Rehabilitation. ~|~05 - 4R Maintenance - Resurfacing~|~A82720E236DCD6A17A909DEC11AED2B99D47BAD4 118819~|~1~|~1~|~01/S50~|~Roundabout items~|~03 - Reconstruction - Added Capacity~|~10892A513425CED77165269D940799923A56D47D 118978~|~1~|~1~|~01/SAF~|~Plan split for district wide signal contract.~|~21 - Safety~|~F2C6FC6A100AA405F535B0C3BD63167A5264D997 104405~|~1~|~1~|~01/NFP~|~Construction of salt barn at Jackson County Oak Hill outpost.~|~44 - Other~|~BB603F64E552CF33E7A11238DA6DF712C09FC9D8 97411~|~1~|~2~|~02/NFA~|~Replace SFN 7634188 STA-TR 153-1.15 Elson St SE over Little Sandy Creek, Stark County, Ohio.~|~15 - Preliminary Engineering~|~4885DCC2553D76DCE0053E714C3444AA9895B4F6 97411~|~1~|~1~|~01/NFA~|~Replace SFN 7633491 STA-CR 25-0.71 Aebi Avenue over Beech Creek, Stark County, Ohio.~|~10 - Bridge Replacement~|~D51511EE873DF0897897785F12CFEE8A36EF54B2 97411~|~1~|~3~|~03/S>2~|~Replace SFN 7633270 STA-CR 212-0.18 High Mill Ave NW over Mudbrook Creek, Stark County, Ohio.~|~15 - Preliminary Engineering~|~DCCE0DB6D964D7A3D3F1C7DA4F07588892C93256 84630~|~1~|~3~|~03/S<2~|~PIK SR220 7.05 - 13.51 Resurfacing ProjectBrdg F/Rehab in Urban portion of project.6602347 PIK SR220 8.11 Intersect: Crooked Creek80/20 split03/S<2/BR/State~|~13 - Bridge Rehabilitation~|~0723197556C2E8459B361B6C84462AB7F45DBCCC 84630~|~1~|~1~|~01/S<2~|~PIK SR220 Resurfacing Project.SLM 7.050 to 9.550 urban areaBegin project @ Waverly west corp, head east and terminate at Shuster Road (Zahan's Corner). CO CC PV Urban 80/20 split01/S<2/PV/State~|~05 - 4R Maintenance - Resurfacing~|~11677FB9A3FAD312408C51FA4283964C9427FD0B 84630~|~1~|~4~|~04/STR~|~PIK SR220 7.05 - 15.06 Resurfacing ProjectBrdg's F/Rehab in Rural portion of project6602398 PIK SR220 9.706602533 PIK SR220 12.43 Intersect: CSX RR80/20 split04/STR/BR/State~|~13 - Bridge Rehabilitation~|~11DCA8A817429CB8D3029105B33909912A9A2ECD 84630~|~1~|~2~|~02/STR~|~PIK SR220 7.05 - 15.06 Resurfacing Project.SLM 9.55 to 13.51 rural areaBegin project @ Waverly west corp, head east and terminate at Shuster Road (Zahan's Corner). CO CC PV RuralPave thru brdg:6602401 PIK SR220 10.53 Intersect: N&W RR6602436 PIK SR220 10.57 Intersect: C&O RR80/20 split02/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~1E88CC35B709BEF21D1D2A80C7E3A1D54A3E985C 126993~|~1~|~1~|~01/NFA~|~Chip seal of various routes in Gallia County as part of the FLAP program.~|~~|~E00A0037277FEFAE3FFD09033300EF55699D58C6 90191~|~1~|~1~|~01/NHS~|~Highwyay Lighting - 2 locations on WAY US 30~|~44 - Other~|~5192EE2AEF64CD981B716501000FB088859254E0 103955~|~1~|~2~|~02/S>2~|~This split includes all work associated with providing added capacity on the project. ~|~03 - Reconstruction - Added Capacity~|~9772A97FFD16B470DA3F0CBB53A577DC191C9674 103955~|~1~|~1~|~01/S>2~|~Intersection and roadway reconstruction of the existing. No capacity addition.~|~04 - Reconstruction - No Added Capacity~|~9ECE2202F472C0458ADF5D5CC1DB1D99325AA244 94350~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay on MEG 124 47.86, SFN 5301718.~|~13 - Bridge Rehabilitation~|~6A3870DB83995912FFE16598C198B71A854E9243 94350~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay on MEG 7 2.43, SFN 5300037 and MEG 7 2.63, SFN 5300061. NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~C2696E15FA4E60FB5BE3FF7C5CEB78471B5E1547 116058~|~1~|~1~|~01/BRF~|~Replace structure SFN #7031173 with OBPP funding at 100% - CO & CE~|~10 - Bridge Replacement~|~FA2A6E32D5F8DA2B1B0456E710E2EF3C1C3C78DC 97402~|~1~|~2~|~02/NFA~|~Replace SFN 6739555 POR-CR 50-3.71 Stroup Rd over Unnamed Stream.~|~10 - Bridge Replacement~|~23D708CBAB67FCE3689DAB371797D30D3B64746A 97402~|~1~|~1~|~01/NFA~|~Replace SFN 6731252 POR-CR 47-5.49 Industry Road bridge over Barrell Run, ~|~10 - Bridge Replacement~|~6E25ADD25BA21F525AFB2F4690AC10F0724C6F7C 97402~|~1~|~3~|~03/NFA~|~Replace SFN 6734952 POR-CR 72-0.43 Johnnycake Road over Feeder Canal Tributary.~|~10 - Bridge Replacement~|~9F09D6D8432260D0D026C7A5171E1536240F15F7 111508~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9B8A444C989A62AFDAA2F013963CA0C22964C699 114398~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district.~|~21 - Safety~|~8837D010BD8CF2CD6584B93F868A7CE079A0221C 102590~|~1~|~1~|~01/NFP~|~Access control/intrusion and CCTV, fencing and gate.~|~44 - Other~|~7F2F69B8FEC5161539883CBD46AB5C52A6D10BC0 112618~|~1~|~1~|~01/MPO/STRU~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~17383E0D9D7FEFE93CE0E225D51968B33ABA50E2 112618~|~2~|~2~|~02/ENH/STRU~|~Sidewalk repair/replacements on Elm St, in the City of Struthers.~|~28 - Facilities for Pedestrians & Bicycles~|~5EDF317A0223E1F33B5186E0BA2616D4E7B9A872 112618~|~2~|~3~|~03/ENH/STRU~|~100% Local Items.~|~28 - Facilities for Pedestrians & Bicycles~|~0A562410354531E3BF20754B1B965CFF60506C94 99912~|~1~|~1~|~01/BRF~|~CEAO funding for bridge replacement SFN 8037787 Cunningham-Arbela Rd over Rush Creek~|~10 - Bridge Replacement~|~DD8D1771E923D13AF3D6D26B8C8456339EF9CACF 110581~|~1~|~2~|~02/STR~|~100% Local Items~|~05 - 4R Maintenance - Resurfacing~|~4B77A65A43A0C40C5F7FC65BEA9425E422AB5916 110581~|~1~|~1~|~01/STR~|~FAY-38 from 0.00 to 8.95~|~04 - Reconstruction - No Added Capacity~|~A603A980211A7655288676CBBDBEA1CDEE5F3EB0 103793~|~1~|~1~|~01/SAF~|~Safety: "Roadway, Splitter Islands, Drainage, Curbing, Traffic Control"~|~21 - Safety~|~0501E5F685F6937973FFF10313D43B3CB8D288E8 103793~|~1~|~2~|~02/SAF~|~Small Cities: "Sidewalks, Sewer, Lighting, Landscaping"~|~21 - Safety~|~2A852FDE102268989E6934E70535F9FF93D66A77 103793~|~1~|~3~|~03/SAF~|~OPWC: "Water Works"~|~21 - Safety~|~32F3102B48B7936D426319D2AAC601C2D4F6548B 103793~|~1~|~4~|~04/S<2~|~This is for overlay work on CHP US 36 SLM 14.88 to 15.05 covered under the Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~28DF5A766BAA9C57A5CBFC638B2D62EFC8CA826B 103793~|~1~|~5~|~05/NHS~|~This is for overlay work on CHP US 68 SLM 6.55 to 6.70 covered under the Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~03A7E64CCAD20D30C96ABF56A08627C92BDC1118 126906~|~1~|~1~|~01/SAF~|~PM on various county routes. ~|~21 - Safety~|~4DD267224F3FDAF9DCD012DEA6C8CD16F32591DC 115228~|~1~|~1~|~01/SAF/TUS~|~Pavement marking on various county routes with 100% CEAO Safety funds (4HB7).~|~21 - Safety~|~5783096EACF2586FF9E587F78D87FF7D61991CE4 86149~|~2~|~3~|~03/NHS~|~Signal and turn lanes on SR-3 at Plumb Rd~|~21 - Safety~|~30C92D5E7159B04A48A51F17607F8937F843A426 86149~|~2~|~4~|~04/NHS~|~Culvert replacement (District funding)~|~05 - 4R Maintenance - Resurfacing~|~71542C117E7E8ED06AB7F01F89070CA29793A472 86149~|~1~|~2~|~02/NHS~|~Ashpalt overlay on 1 structure:2100045 DEL SR3 6.92 Intersect: Little Walnut Creek~|~05 - 4R Maintenance - Resurfacing~|~CD95F92DC56B8FCDAC0B5768B69BDED4FBFBC28E 86149~|~1~|~1~|~01/NHS~|~D6 federal/state resurfacing of DEL-3 SLM 1.38-8.74 including two culvert replacements and signal work on existing signals~|~05 - 4R Maintenance - Resurfacing~|~CC54550E0D3B6AC3A49D1CC6F92DD74368C74DE5 120462~|~1~|~1~|~01/NFP~|~ODNR project for resurfacing park roads and the headquarters at the HOC Tar Hollow State Park.~|~05 - 4R Maintenance - Resurfacing~|~43C589FB9F3C4DA96494ADE6404C486DE10CF655 91029~|~1~|~1~|~01/MPO~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1E6CABF2BDAE1A7675C5E8FA1D16057B2C6F0340 97626~|~1~|~3~|~03/S<2/COSH~|~"01/S<2/PV/COSH - additional plan split for work identified inside the Corporation Limits of the City of Coshocton location from 1.88-3.30~|~05 - 4R Maintenance - Resurfacing~|~0FF9E6754AF80B8D16A266A30F5AA610DFFDCB50 97626~|~1~|~2~|~02/STR/WLAF~|~"02/STR/PV/WLAFA" Resurfacing w/in the Village of West Lafayette from mile marker 6.27 - 6.74~|~05 - 4R Maintenance - Resurfacing~|~50E2A1F84FEFB635A5568E933C06EC3A9652DD48 97626~|~1~|~1~|~01/STR/CCEO~|~"01/STR/PV/CCEO" - Resurfacing of Coshocton County Road 16 - from mile marker 3.30-6.27 utilizing CEAO STP funding SAC 4B77 with a maximum dollar amount of $1,638,300,000. Current project estimate is $1,748,186~|~05 - 4R Maintenance - Resurfacing~|~318338CD8EC385A5844CE511336090751B114227 117449~|~1~|~1~|~01/BRF~|~Bridge Replacement (SFN 2133296)~|~13 - Bridge Rehabilitation~|~655F819FDD42248A1168FBD8B079AA07D501D524 114956~|~1~|~1~|~01/S<2~|~Bridge overlay~|~13 - Bridge Rehabilitation~|~828E4D01A429FE8B63215A086D28BE7D2359ABA4 114956~|~1~|~2~|~02/STR~|~Bridge overlay~|~13 - Bridge Rehabilitation~|~C5553205D76FE0AF2A2B71F0CC67B83C9904A89A 123449~|~1~|~1~|~01/NHS~|~Resurfacing SR 154 from US 30 to SR 11 (SLM 2.37)~|~05 - 4R Maintenance - Resurfacing~|~9BA5F5F71EACC8516F7860950306535AF9C10D82 123449~|~1~|~2~|~02/STR~|~Resurfacing SR 154 from SR 11 (SLM 2.37) to SLM 9.84~|~05 - 4R Maintenance - Resurfacing~|~F546DB8857B741D4AAA6C11FC368C23D7356E99C 122802~|~1~|~1~|~01/STR~|~Resurfacing on Various Highland County Routes.~|~05 - 4R Maintenance - Resurfacing~|~09D442C03D1CBE4D1D564BCD7562548074E74029 81174~|~1~|~1~|~01/CMQ~|~replacing Central Avenue grade crossing with a new grade separation over CSX Railroad on new alignment~|~01 - New Construction~|~1D99E51FBDA6634EE20B3D5EB52C515C0BCF8D42 125664~|~1~|~1~|~01/STR~|~Plan split for resurfacing in the rural sections.~|~05 - 4R Maintenance - Resurfacing~|~571C7AD2420D1BEDD55D0717EF9D9907E847C918 101378~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~F204BE2E84215671612F80EEEDCF734671C8FF4A 98035~|~1~|~1~|~01/NFP~|~District 10 two-year mowing project for CY 2018-19 along Interstates and Interstate look-a-likes (4 LN) district wide. Funded 100% state.~|~44 - Other~|~3B37059856A7129EF50B97EF62B63BF906446BE7 118950~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~102E1F988CB75568519FE5845D8F2020EA488E33 95909~|~1~|~1~|~01/NFP~|~Removal of UFST~|~~|~B5E9A9D66456157A485CB2EEA212EC1F6C34EE04 125465~|~1~|~1~|~01/NHS~|~80% federal district preservation, 20% Local city match. Work on US 224 under the NHS classification.~|~05 - 4R Maintenance - Resurfacing~|~8CE039E0573FCFE76E3AD170FD8EF692741BB8C7 107530~|~1~|~1~|~01/STR~|~Resurfacing TUS-39~|~05 - 4R Maintenance - Resurfacing~|~35A02442734C4012632B0979A8B687DB41ED30C7 107683~|~1~|~1~|~01/STR~|~Resurfacing in Hardin County. All work on SR 37 and work on SR 53 from the Kenton Urban Area limits at TR 110 at SLM 2.50 to SR 37 at SLM 12.39. Funded with district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~7837D150CA663DEAEF5768EE80416F5738BAF728 107683~|~1~|~2~|~02/S<2~|~Resurfacing in Hardin County on SR 53 inside of the Kenton Urban Area but outside of the City of Kenton. On both sides of the road from where SR 53 leaves the City of Kenton at SLM 1.41 to where it reenters the City of Kenton on the right side of the road at SLM 1.54, then on the left side of the road until the road leaves the City of Kenton on the right side of the road at TR 114 at SLM 1.92 and then on both sides of the road until SR 53 leaves the Kenton Urban Area at TR 110 at SLM 2.50. Funded with district preservation program funds (80% 4PF7 and 20% 4PS7). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~015CA39B484FF0609391C2C6EC2D057E797D59F6 107683~|~1~|~3~|~03/S<2/KENT~|~Resurfacing in Hardin County on SR 53 where the City of Kenton is responsible for paying the 20% non-federal match. On both sides of SR 53 from E. Forest Street at SLM 1.34 to the City of Kenton corp line at SLM 1.41 and on SR 53 on the right side from the City of Kenton corp line at 1.54 until SR 53 leaves the City of Kenton on the right side at TR 114 at SLM 1.92. Funded with 80% federal funds from the district preservation program budget SAC 4PF7 with the 20% match provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~8CB669FB6701AE833870F95674177DA3B95CF105 107705~|~1~|~1~|~01/STR~|~Resurfacing on SR 108 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~6290DE61170AEEEDE60190BB6BA93C59C6734938 110438~|~1~|~1~|~01/S>2~|~Resurfacing of Frank Ave.~|~05 - 4R Maintenance - Resurfacing~|~C36E9DCC8B1929D2724B4FF1BA4C31AA784205C9 91780~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay treatment. NOB 77 2.50-2.75. Interstate route funded 90% Federal and 10% State.~|~05 - 4R Maintenance - Resurfacing~|~30D0A55662625AA351912086D541BCCAE094CE65 95139~|~1~|~1~|~01/IMS~|~Construct new wearing surface for all or various areas on structure HAM-71-0000L (SFN 3105946)~|~~|~2C687E30AAF5BCB8FB19CEB254F1A2CF5191D36B 112254~|~1~|~1~|~01/STR~|~Plan Split 01 made to account for routes falling within this block PID~|~05 - 4R Maintenance - Resurfacing~|~7B93753A41C4E684EE7F9616591502A353C90310 122004~|~1~|~1~|~01/S>2~|~Intersection improvement~|~21 - Safety~|~13AB890AD483F68D06918A450CD6356EAA264FE5 111515~|~1~|~1~|~01/NFP~|~Mowing various routes in Franklin County~|~44 - Other~|~12F355EFC1295A26BE060B4F3F1265601D9B93D6 112219~|~1~|~1~|~01/NFP~|~This project includes but is not limited to the widening of Seeds Road and Enterprise Parkway. These improvements will follow the alignment of the existing roadway, which extends to the west from the intersection with South Meadows Drive, then curves south where it runs along the east side of I-71 to the Grove City Limits. This new construction will include pavement repairs, asphalt surfacing, widening on Seeds Road and Enterprise Parkway and other ancillary items.~|~44 - Other~|~83B1FB173576569136E4565D2538E5732691B7F2 112219~|~2~|~2~|~02/NFP~|~629 Funds~|~~|~CDB2A3376D254524DF4FFA456A79013C2E16ADD1 112219~|~3~|~3~|~03/NFP~|~Local Funds~|~~|~6F2F0444F93739EAE3574D61E0689A488D01D432 120734~|~1~|~1~|~01/MPO~|~Add two-way left turn lane, curb and gutter, storm sewer and multi use path~|~04 - Reconstruction - No Added Capacity~|~B27EBE65959A51D2820A17D24110502FFB4CB699 101011~|~1~|~1~|~01/STR~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~1254768B28BA37CE3B6177072D02AB005F4BF4A7 104236~|~1~|~1~|~01/STR~|~Repair structure UNI-161-2.72 over Little Darby Creek. SFN 8002738~|~13 - Bridge Rehabilitation~|~81660732426BEE36548DCE316A93AF662E1D46E0 91272~|~1~|~1~|~01/STR~|~PIK SR104 4.60 OH11-02 Slide Repair On SR104, begin project 4.6 miles north of the Scioto County line. It is proposed to repair the slip per Fed Dec #OH11-02. 80/20 split 01/STR/OT/State~|~44 - Other~|~E5A6F71C81B8A9383FEA9E6122E9E15EF3D5BBDF 114652~|~1~|~1~|~01/NHS~|~Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School.~|~10 - Bridge Replacement~|~B2E381936AC092F4C9A16B44B01103D9821E940F 109332~|~1~|~1~|~01/NFP~|~ODNR resurfacing campground at Indian Lake State Park~|~05 - 4R Maintenance - Resurfacing~|~88DE99093E3A39F67165AC0D93EBC67194FB757E 101259~|~1~|~1~|~01/NFA~|~The County is constructing road improvements to support the new Lubricatoin Specialities, Inc facility. Adding an entrance lane off of County Road 253 into the new greenfield site.~|~01 - New Construction~|~329A705BEA01A366A06BB089CAC5DBBE62DD591F 124284~|~1~|~1~|~01/ENH~|~TAP / Safety plan split~|~28 - Facilities for Pedestrians & Bicycles~|~1F6BA123C2E76198983B96D38CA5EE524B80CBA7 112154~|~1~|~2~|~02/NHS~|~District wide culvert project.~|~04 - Reconstruction - No Added Capacity~|~18303723C4DCB34E8D8FE3A51E129D592A743357 112154~|~1~|~3~|~03/NFA~|~District wide culvert project.~|~04 - Reconstruction - No Added Capacity~|~F1B3A48EBD44737D23304234C32370A8E2668D90 112154~|~1~|~4~|~04/S5K~|~District wide culvert project.~|~04 - Reconstruction - No Added Capacity~|~926E35741D691B19E6A550291A813D522846285D 112154~|~1~|~1~|~01/STR~|~District wide culvert project along STP Rural Routes~|~04 - Reconstruction - No Added Capacity~|~707E779DF44A7B3D83CFB2A7F1C79ACD6F9DBDF9 110036~|~1~|~1~|~01/BRF~|~Bridge ReplacementPIK CR 84 4.60 (SFN 6631371)~|~10 - Bridge Replacement~|~BE276B17D3786053E8044ED2AB7014FD45F4B6E2 98894~|~1~|~1~|~01/ENH~|~Installation of 8' walk from Youngs Court to Park along SR 39.~|~28 - Facilities for Pedestrians & Bicycles~|~B146A79E24FD63F7840C20F64DB09F9B2BBFECBE 105583~|~1~|~1~|~01/S<2~|~AC Overlay w/Rpr ASD IR 71 00.00 - 08.93.~|~17 - Construction Engineering~|~A4AC57700C220BA4D5306D122026C11E7A99C56E 105583~|~1~|~2~|~02/S<2~|~Bridge Work to be determined at a later date.~|~~|~C36FC3F15B39FEC5E9A89830A55AF983B707252B 83096~|~2~|~2~|~02/MPO/PV~|~Revised Plan Split from part 1 to part 2~|~05 - 4R Maintenance - Resurfacing~|~945DBE7F98B0902B45ED1F894F19183FE0815EB3 83096~|~1~|~1~|~01/MPO~|~Mill and fill~|~05 - 4R Maintenance - Resurfacing~|~EED7D9C2C4392DCA518F829A310D08E82F17114E 116078~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~99 - State Preventative Maintenance~|~E8FB192F3781354C0883F4E6D4EE58D7BFE9FC1D 120944~|~1~|~1~|~01/NHS~|~Replace sidehill bridge carrying SR 7 northbound over slope.~|~10 - Bridge Replacement~|~7569FEE06B0FF07642AE820C25717A5782710D71 105431~|~1~|~1~|~01/S<2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Deck replacement project for SFN 1601652 and 1601687 carrying SR 83 over the Ohio Central RailRoad~|~10 - Bridge Replacement~|~0BB9DF86E14DCCF5FA2601E6AC6D8B7610C4C97B 87926~|~1~|~3~|~03/STR~|~STP Rural locations - bridgeSFN 2103745, DEL-605-3.14, 12' span bridge replacement over Woodtown Run~|~13 - Bridge Rehabilitation~|~066AE2A286DA71F007628DAD97FEFD506E32D59F 87926~|~1~|~2~|~02/NHS~|~NHS Bridge locationSFN 6500439, PIC-22-20.00 15' splan bridge replacement over Pugsley Run~|~13 - Bridge Rehabilitation~|~6CD3D8DAA9DEE78AA12BBFF6210919A82D34BC7E 87926~|~1~|~1~|~01/NHS~|~NHS locations: MAR-23-6.14 culvert replacementUNI-739-0.26 culvert lining~|~13 - Bridge Rehabilitation~|~D74333E960EB16342EA657E817F18F684BC2B7A0 87926~|~1~|~4~|~04/NFA~|~Not on Federal Aid System locationFAY-753-4.63 culvert replacement~|~13 - Bridge Rehabilitation~|~E1E42788116FA767F6567BC624C182BAE2495D43 104183~|~1~|~1~|~01/NHS~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project. NHS route.~|~21 - Safety~|~CF98D3ECC3AC850EA2713BB4C408A326991BB5FF 104183~|~1~|~3~|~03/NHS~|~Add ITS camera to the ATH US 33 14.02 location. Funds are 100% State, 4IS7 SAC.~|~21 - Safety~|~113CE4BE04BA125B0523A11CF9AB9C822C0A6A52 104183~|~1~|~4~|~04/NHS~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project.~|~21 - Safety~|~6677A041BB379EE5A519A3F33D44481BB0BB99CB 104183~|~1~|~5~|~05/S<2~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project.~|~21 - Safety~|~3C09B4BCF23343C013BB5F4C16C6B5CC8B987288 104183~|~1~|~2~|~02/S<2~|~Interchange replacement project at ATH US 33 and State Street in the City of Athens. The design will be a traditional interchange with additional turn lane storage to reduce congestion and improve safety. The City of Athens will add sidewalk and resurface East State Street in the same project. Urban other federal aid.~|~21 - Safety~|~56EB531E555FDEC11CCC6ABD79529D15B765539C 93427~|~1~|~1~|~01/SAE/DLTA~|~FUL US20A 19.65-19.87~|~21 - Safety~|~6FACB11997816288826139D054A12443466E844E 82354~|~1~|~1~|~01/BRF/NEWA~|~LCAT's STP Funding 4TA7/LC05 (80% Federal) / 4BG7(20% Local) - CAP (See CAP Comments) - Rehabilitation of 4560159 LIC Ohio ST NORTH FORK Intersect: NORTH FORK; BR Eligible for Rehabilitation:~|~13 - Bridge Rehabilitation~|~A1C93D2B55222E7E3E6FE7C0A0310D53710FE95D 82354~|~2~|~2~|~02/BRF/NEWA~|~LCAT's STP Funding 4TA7/LC05 (80% Federal) / 4BG7(20% Local) - CAP (See CAP Comments) - Rehabilitation of 4560205 LIC Manning ST NORTH FORK Intersect: NORTH FORK; BR Eligible for Rehabilitation:~|~13 - Bridge Rehabilitation~|~0DE27E129CC433F5C119D6FADAA44B6CA1B32079 82354~|~3~|~3~|~03/ENH/NEWA~|~City of Newark TA project - Enhancement 4B37 (80% Federal) / 4BG7 (15% Local-TRC) / 4BG7 (5% Local) - CAP (See Comments) - Construction of mulit-use trail between CR 823 (Ohio Street) and S. 2nd Street~|~28 - Facilities for Pedestrians & Bicycles~|~F47B58A38A462FF002BC7FCC065727B9E0747A63 94108~|~1~|~2~|~02/STR~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~BA10DACF96390C768613705E72101E8A7EDDBF83 94108~|~1~|~1~|~01/STR~|~Resurfacing ATB US 322 from 17.49 to 22.48.~|~05 - 4R Maintenance - Resurfacing~|~C6FD4E6463BA374C3463380E78A6EDFCBF3358AE 102181~|~1~|~1~|~01/NFA~|~LAW SR 775 15.45 (SFN 4404807)LAW SR 775 15.70 (SFN 4404831)~|~10 - Bridge Replacement~|~F731ECFACF45A876006542626D5F18CF34D6D56C 83447~|~2~|~4~|~04/MPO/AVON~|~NOACA Enhancement Funds / Local Match ( $882,196 4TC7/NC12 - 20% Local Match) for widening of bridge for sidewalks and bike/multi use path. Tentative NOACA funds cap of $882,196. Priority 2 is 100% City of Avon funds~|~28 - Facilities for Pedestrians & Bicycles~|~3046856CD826DE54351DBE9BAEDC303A0391C831 83447~|~2~|~3~|~03/IMS~|~District Allocation / IM Funds / BR Funds - non enhancement/widening aspects of bridge rehab~|~13 - Bridge Rehabilitation~|~5565A0CC271A01B99B4ECFC42555EE354E1BCE13 83447~|~1~|~2~|~02/S<2/AVON~|~Part 1 Urban Paving - 100% City of Avon responsibilities~|~05 - 4R Maintenance - Resurfacing~|~5E5BD11945F325C9DE3703A78EE152881D6EF807 83447~|~2~|~6~|~06/IMS~|~District Allocation 90/10 - Interchange Lighting Work~|~44 - Other~|~A5478BEF125C74DA813814BAA894266728B0FB01 83447~|~2~|~5~|~05/S<2/AVON~|~Part 2 Urban Paving - 80% Fed / 20% City of Avon~|~05 - 4R Maintenance - Resurfacing~|~BE275B728993A094BC06D803BC70A908575ADF83 83447~|~1~|~1~|~01/S<2/AVON~|~Part 1 Urban Paving - 80% Fed / 20% City of Avon~|~05 - 4R Maintenance - Resurfacing~|~C09773EF1E9B4F280F0D129FAB04DB0F1E14F8EB 108341~|~1~|~1~|~01/SAF~|~Signal improvement project at 3 intersections. WAS 7 7.25-7.60 Farson Street, WAS 7 8.50-8.70 Braun Street and WAS 618 5.52-5.60 Lee Street. Safety project funded 90 federal safety/10 local.~|~21 - Safety~|~BF94FA95FF11C1C90F46069947720943478C10A6 120810~|~1~|~1~|~01/STR~|~Pavement markings.~|~21 - Safety~|~27D1376E6B8AE2778E7179C4A5E7073E72A24C85 114935~|~1~|~2~|~02/S>2~|~Asphalt Concrete Overlay with Repairs (100% local funds) MED-3-9.868 to 10.949, MED-57-10.425 to 12.729~|~05 - 4R Maintenance - Resurfacing~|~A1E621A6628BD84C4926FECC2CB5B565198D682D 114935~|~1~|~1~|~01/S<2~|~Asphalt Concrete Overlay (Fed/Local split) MED-3-9.868 to 10.949, MED-57-10.425 to 12.729~|~05 - 4R Maintenance - Resurfacing~|~98E5CEBF95B007AF88B5C9A7718B61D24FD89396 116292~|~1~|~1~|~01/STR~|~Overlay in HIG.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5A9CDBDAAF72F53DFAD748C6C1B1F332E67E19F1 117425~|~1~|~1~|~01/SAF~|~Pedestrian improvements on Innis Rd.~|~21 - Safety~|~CC2D08F4754707063D4EAC6D955EEA655B3F7156 92453~|~1~|~1~|~01/STR~|~To replace culvert at FAY 41-3.41 with 14' box~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E4079C1280F126D06BFE29B7FDCCD3B3CBFA89B 112873~|~1~|~1~|~01/NFP~|~The Village of Hebron will reconstruct Enterprise Drive from SR79 east 880 feet.~|~44 - Other~|~AA171637B467CB8710B12CF83FE33CFB1BB3039D 86730~|~1~|~2~|~02/S<2~|~District Allocation~|~13 - Bridge Rehabilitation~|~36DFAFC1841BA31CD28422867B89EFED488B19A0 86730~|~1~|~3~|~03/NHS~|~District Allocation - NHS - LOR -058-16.51 - 20.97~|~05 - 4R Maintenance - Resurfacing~|~5C6AF875FF20251E57FF125EED23860BF6F6D7E3 86730~|~1~|~1~|~01/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~D85397A3904CD943300F04D5F42FDC6C9D36CF09 120445~|~1~|~1~|~01/NFA~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~2974C78E07C305311ADBF2ACF9A71326503E66BA 90777~|~1~|~1~|~01/S<2~|~District Allocation - Intersection Improvement~|~21 - Safety~|~7F0EEE700CDA3B3EC7544B619DD9F0CD0AF11E9E 126103~|~1~|~1~|~01/BRO~|~Plan split for all work associated with HEN-65-1671 bridge~|~13 - Bridge Rehabilitation~|~5428DF74319199B39E7C80D271A0D28E379FA905 104159~|~1~|~1~|~01/S<2~|~LAW 7 4.10 Rockfall.~|~04 - Reconstruction - No Added Capacity~|~4BA6AB7CAA94634C2F38B11F028143D526CB1AFE 109770~|~1~|~1~|~01/NHS~|~Double micro~|~05 - 4R Maintenance - Resurfacing~|~394972C0C1DE9F0AF6F71FCDEAB5D028714DFFFA 109770~|~3~|~3~|~03/S5K~|~Double Microsurfacing of priority system~|~05 - 4R Maintenance - Resurfacing~|~EF4ED6200B74702738688269C8E943D426CE9718 109770~|~2~|~2~|~02/STR~|~Double Microsurfacing of priority system~|~05 - 4R Maintenance - Resurfacing~|~7BF11AE9B530CF53AAF51C8BB5026EA028354358 120340~|~1~|~1~|~01/S5K~|~Culvert Replacement GAL SR 233-0.306~|~04 - Reconstruction - No Added Capacity~|~54956508768253CA1CC75FB4137D336552AC799C 102293~|~1~|~1~|~01/S<2~|~Resurfacing SR 647 within the City of Martins Ferry.~|~05 - 4R Maintenance - Resurfacing~|~55141056CC0FECD8ED394C67864ECAED9910C0D6 102293~|~1~|~2~|~02/S<2~|~Curb ramps and auxiliary pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~C2412DAD14FF10515DEC5EF612AC3BCF0320BDA0 107405~|~1~|~1~|~01/BRF~|~Bridge has no SFN~|~40 - Special Bridge~|~32AC484122BB61572110D817D7EC03934ADDAE5C 109018~|~1~|~1~|~01/NHS~|~Funding Split for Emergency Pier Repairs.~|~13 - Bridge Rehabilitation~|~9BC217AA46AC0B15E9262704602811406926323D 119419~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~4F58881DBFB6E9025D8E906D5A7344BF2D802128 113045~|~1~|~1~|~01/BRF~|~Replacement of Bridge PRE TR-149-1.79 (SFN: 6835015)~|~10 - Bridge Replacement~|~8C565CB83CD39221C46B2BBB9D9B84B55268FAC8 101910~|~1~|~1~|~01/NFA~|~Mill & fill CR 43 (Patten Tract Road) and CR 140 (Joppa Road).~|~05 - 4R Maintenance - Resurfacing~|~05C6044E9A1CA03036BAABAA27CAB3309EDDE8CF 101910~|~1~|~2~|~02/NFA~|~Mill & fill TR 131, Chapin Road.~|~05 - 4R Maintenance - Resurfacing~|~8A47D72A9AB2178D80F9250A8D52912A97E45422 101910~|~1~|~3~|~03/NFA~|~Guardrail improvements on Humm Road, TR 134.~|~05 - 4R Maintenance - Resurfacing~|~7D1AB5D61AB065AC6B75F50FDCED1C32EEF16E33 125498~|~1~|~1~|~01/MPO~|~Plan split at 80% 4CT7/KI08, 20% local match for eligible items~|~28 - Facilities for Pedestrians & Bicycles~|~2C46B479E3595F62D3A0AE032F159ECFB0252841 107667~|~1~|~1~|~01/STR~|~Resurfacing. All work on SR 37 and SR 103. All work on SR 67 except for the portion in the Upper Sandusky Urban Area with is from the Urban Area Boundary at City of Upper Sandusky Urban Area limits at 12.65 to the end of the work at High Street in the City of Upper Sandusky at 14.16. All work on SR 293 in the Village of Kirby. Using district preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~B1C47A14D05B1FB4BC02F74EF439C432386CE289 107667~|~1~|~2~|~02/S<2/KENT~|~Resurfacing of US 68 in the City of Kenton from the south corporation limits of the City of Kenton at 8.84 to the Espy Street intersection in the City of Kenton at 9.25. The 80% federal funds will be from the District Preservation Program budget. The 20% match will be provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~166D96DD1D69ED1EE10F6DD5A7ED13E99A5F4BE0 107667~|~1~|~3~|~03/S<2/USAN~|~Resurfacing in the City of Upper Sandusky on SR 67 on the right side from where SR 67 enters the City on the right side at 12.65 until the leaves the City at 12.88 and then again on the right side of SR 67 from when it reenters the City on the right side at 13.13 until it leaves the City at 13.32 and then on the right side of SR 67 from 13.35 where SR 67 reenters the City and on the left side from 13.67 where SR 67 enters the City of the left side until the end of the work at High Street in the City of Upper Sandusky at 14.16. The 80% federal funds will be from the District Preservation Program budget. The 20% match will be provided by the City of Upper Sandusky.~|~05 - 4R Maintenance - Resurfacing~|~24C82177E76B60ACD61974C9B68AAA0C717BB50E 107667~|~1~|~4~|~04/S<2~|~Resurfacing on SR 67 in the Upper Sandusky Urban Area but outside of the City of Upper Sandusky. All resurfacing work on SR from when SR 67 enters the Upper Sandusky Urban Area at 12.65 not included in plan split 3. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~D2DB330A460814010F9482A9EC6EA180D35B0F79 107667~|~1~|~5~|~05/NFA~|~Resurfacing on SR 293 in Wyandot County from the south corporation limits to the north corporation limits of the Village of Wharton and on SR 294 in Wyandot County from the west corporation limits to the east corporation limits of the Village of Harpster. The sections of road in this split are classified as Rural Minor Collector and are not eligible for federal funds. Funding is state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~6602172D173FBC7C899DD2D7ED7A513686C05EE4 103333~|~1~|~1~|~01/NHS~|~Repair or replace culverts on NHS route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1CCEAAA890905D5079E42D9CF01FA27AFAC18599 103333~|~1~|~2~|~02/STR~|~Repair or replace culvert on rural route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~36E76141759D15545DC5083465E3165847778211 102872~|~1~|~1~|~01/IMS~|~Repair crack in web of beam 2 which carries mainline I-70 traffic over US 68; Br. No. CLA-70-1101; SFN 1204238~|~13 - Bridge Rehabilitation~|~FB974EBCE2F8980FBC85E8D54283AC86DCCD4630 116796~|~1~|~1~|~01/STR~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~63AFDDD3ACDB4F27C76610C4898F7CF85FE37840 111154~|~1~|~1~|~01/IMS~|~Inlet basins on I-280~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3DDC9E2C18C0C78A780F0EC25CBB79F1C865345E 113123~|~1~|~1~|~01/ENH~|~Plan split for MPO 4TA7 and/or 4TC7 federal funded eligible work with OPWC match on Part 1, PID 113123.~|~28 - Facilities for Pedestrians & Bicycles~|~1E963E5028325E1448AFE8F333286BE60DE0E23A 113123~|~1~|~2~|~02/ENH~|~Plan split for MPO 4TA7 and/or 4TC7 federal funded eligible work with Local match on Part 1, PID 113123.~|~28 - Facilities for Pedestrians & Bicycles~|~03E87546CB197257F6249EA54A0F9AFFC33B7A12 113123~|~1~|~3~|~03/NFP~|~Plan split for 100% local funded items that are OPWC fund eligible on Part 1, PID 113123.~|~28 - Facilities for Pedestrians & Bicycles~|~E9839F69887D59E3255316BA99F629F2572F3CBD 113123~|~1~|~4~|~04/NFP~|~Plan split for 100% local funded items that are non-eligible on Part 1, PID 113123.~|~28 - Facilities for Pedestrians & Bicycles~|~B8F1B545B3D6197A74BCD3EC316C99EFA53D9039 113123~|~2~|~5~|~05/ENH~|~Plan split for MPO 4TC7 federal funded eligible work with OPWC match on Part 2, PID 114131.~|~28 - Facilities for Pedestrians & Bicycles~|~17A9F84BFEA4BE6BB1240ACB2C32D395B693181F 113123~|~2~|~7~|~07/NFP~|~Plan split for 100% local funded items that are OPWC fund eligible on Part 2, PID 114131.~|~28 - Facilities for Pedestrians & Bicycles~|~33A38DBCF5A405DB4CA11D17B79CCF0030ADFFC3 113123~|~2~|~8~|~08/NFP~|~Plan split for 100% local funded items that are non-eligible on Part 2, PID 114131.~|~28 - Facilities for Pedestrians & Bicycles~|~B37A3738C3FF87FA6562E7032D378F93A25F2BCB 113123~|~2~|~6~|~06/ENH~|~Plan split for MPO 4TC7 federal funded eligible work with Local match on Part 2, PID 114131.~|~28 - Facilities for Pedestrians & Bicycles~|~A0D0B078A9FF4CF797215509A18420DFB6399186 113123~|~1~|~9~|~09/NFA~|~Retroactive fuel price adjustment~|~28 - Facilities for Pedestrians & Bicycles~|~B4D811C952FBF527CE9AF6F48B76CB8CBE911054 116191~|~1~|~1~|~01/NFP~|~Bridge Deck Sealing Project.~|~47 - Bridge Preventive Maintenance~|~91FFF16E8416D9394CE07FD236AA75431AC07BC3 102500~|~1~|~1~|~01/STR~|~Chip Seal of CAR-171~|~05 - 4R Maintenance - Resurfacing~|~5C8F52CEAFF9A0934802B4D271603F78B78FA715 98004~|~1~|~1~|~01/STR~|~ROS 772 7.23 (SFN 7105347) Bridge Replacement~|~10 - Bridge Replacement~|~94F4A6DA09736A905DB51A6B74663C27CED58658 98004~|~1~|~2~|~02/STR~|~ROS 772 6.81 (SFN 7105312) Reconstruction~|~04 - Reconstruction - No Added Capacity~|~E3F673A8D16955D8B3FB5004BA9A95E67E150820 121862~|~1~|~1~|~01/S5K/KCPD~|~Resurfacing the Kokosing Gap Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~BBB6DAF18BE7081070E4293A9A8FD99201E1E41C 96537~|~1~|~1~|~01/STR~|~Generic Plan split for rural routes. Routes to be determined later.~|~99 - State Preventative Maintenance~|~808E98613B2373B3A87AD8B086D31D9CDF2304F2 96537~|~1~|~3~|~03/NHS~|~Plan split for NHS routes.~|~99 - State Preventative Maintenance~|~97C781D6EAA4655C2B39248725EDCC57608066E1 96537~|~1~|~2~|~02/S>2~|~Plan split for large urban section on route.~|~99 - State Preventative Maintenance~|~723DA047DBF27F40672D1A9C42B8D451FCBC4173 96309~|~1~|~1~|~01/STR~|~0801488 US62 19.820 It is proposed, on US62, 0.1 mile north of Ash Ridge/Anheim Rd (CR27), to repair/replace the liner (SFN 0801488, SLM 19.82). 0801887 US68 40.910 It is proposed, on US68, to repair/replace the liner (SFN 0801887, SLM 40.91). ~|~04 - Reconstruction - No Added Capacity~|~B0E4E6A9377205C81F244E28934AFD5E8AF8FE31 96309~|~1~|~2~|~02/STR~|~BRO US 62 25.50~|~04 - Reconstruction - No Added Capacity~|~C4FCD406A7138CD071C6C364718F96BD92AFBB77 91151~|~1~|~1~|~01/STR~|~Maintenance contract for SFY 2013 herbicidal spraying. 100% State.~|~44 - Other~|~DD868D6412A91F64E6A6CB0407B1655805907E68 119852~|~1~|~1~|~01/S>2~|~Intersection improvement at Hilliard Rome and Renner Rd ~|~21 - Safety~|~D913CFB2C2B8F41AAC05834911752221CEC4C36E 114606~|~1~|~1~|~01/MPO~|~This plan split includes all work associated with the widening of Fields Ertel~|~03 - Reconstruction - Added Capacity~|~871EDA6435D5E328A67D09D86B1F30B3D4922A0F 114606~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded work to construct a roundabout at the intersection of Wilkens and Bardes.~|~21 - Safety~|~1C6B6F3EF9AD15FDF6728D4FCE7381F449D05AA3 114606~|~1~|~3~|~03/IMS~|~Plan split for resurfacing at the "apron" of the ramp from Fields Ertel Road to SB I-71 to address an urgent repair needed to maintain a condition safe for traveling motorists.~|~05 - 4R Maintenance - Resurfacing~|~FD6AD259B1174967B7E06DB997489B8EE0F5D736 79320~|~1~|~1~|~01/S>2~|~Federal/local funding for urban paving in GroveportFRA-317: SLM 5.43-9.0101/S>2/PV/~|~05 - 4R Maintenance - Resurfacing~|~0C0E63A6256A9EFBC5FA1E51EA053E25480683D7 79320~|~1~|~2~|~02/S>2~|~100% Groveport funding for pavement work on Saltzagaber02/S>2/PV/GPRT~|~05 - 4R Maintenance - Resurfacing~|~B889A93919E1D17629D203A4E62B28E3994C91EA 79320~|~1~|~3~|~03/S>2~|~Federal/state funding for deck patching and sealing:2516268 FRA SR317 7.2 Intersect: Over Csx Rr2516292 FRA SR317 7.2 Intersect: Over Csx Rr2516322 FRA SR317 8.09 Intersect: Blacklick Creek2516357 FRA SR317 8.09 Intersect: Blacklick Creek03/S>2/BR/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C3E81E6F7437E9C51DD7A3A0D99759816DB158F0 100687~|~1~|~1~|~01/STR~|~Spot paving on the general system~|~05 - 4R Maintenance - Resurfacing~|~CE709BE0DD88D9F1422A578C28BFA5EFE6E8F6A8 101295~|~1~|~1~|~01/STR~|~FUL-20A-21.08 to 23.94~|~05 - 4R Maintenance - Resurfacing~|~62DE546AE57B1EA641DB7F7A723703480D78D9F2 101295~|~1~|~2~|~02/SAF~|~Center Line Rumble Stripe Plan split -FUL - SR 20A - 21.39 to 23.94~|~21 - Safety~|~74BE9D7BF4AF24E229177A9FE7F817EE77DA449D 101295~|~1~|~3~|~03/BRO~|~SFN 2600722~|~13 - Bridge Rehabilitation~|~99402448BF5A26604654807B68A14065B4AC720C 98425~|~1~|~3~|~03/S>2~|~Resurfacing MAH SR 625 from 2.59 to 3.04~|~05 - 4R Maintenance - Resurfacing~|~790B20D6EC2A24A2239084712475CB1737B8180D 98425~|~1~|~1~|~01/S>2~|~Major Rehabilitation of MAH US 62 from SLM 9.67 to SLM 13.15.~|~05 - 4R Maintenance - Resurfacing~|~2830069FCB393B80621039362134F75546F530B9 98425~|~1~|~6~|~06/S>2/YOUN~|~100% city of Youngstown Items along US 62.~|~05 - 4R Maintenance - Resurfacing~|~9EB616BEC7420CBE2D942EE84FE1B8853A54F5F3 98425~|~1~|~4~|~04/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~25621708EC961BDD8ED2E6E80EBFB7D3D5A9BF6D 98425~|~1~|~5~|~05/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~32F36910C7BC33416B2A22B5E8FD4155EA98E2F0 98425~|~1~|~2~|~02/S>2/YOUN~|~Resurfacing MAH US 62 15.20 to 17.18 and MAH SR 170 15.54 to 16.27 and MAH SR 625 3.04 to 3.36, urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~E3A0C5D16116EBB2C004AFD710FC255150A00E4C 115096~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall.~|~~|~58FD9C1CA51387622EE5E82176071A96FEEB5A4A 111084~|~1~|~1~|~01/SAF~|~Intense rainfall caused a landslide to over top a retaining wall blocking sidewalk area and extending onto the roadway necessitating the closure of the road until the slide debris could be removed. The landslide had a width of approximately 90 ft. and extended up the hillside for a distance of approximately 90 ft.~|~21 - Safety~|~21F078C7BF4FF63C85BD3B8B3558D935EEE0461E 120351~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~5FEE7673390DC3513BB01711635E8A84338889C2 111416~|~1~|~1~|~01/SAF~|~TMSO funds plan split~|~21 - Safety~|~EC7A5BDB8494172C33317AF2069917F1B1EC09E5 118643~|~1~|~1~|~01/S50~|~Install sidewalks & crosswalks~|~21 - Safety~|~4F63BE7EB0069B4404BFF2157D4A157286F307C4 118643~|~2~|~2~|~02/NFA~|~Install sidewalk and crosswalks on Hillcrest Avenue.~|~21 - Safety~|~C8041F235155991BDE26EC5B1DD64BF7D6184019 88907~|~1~|~1~|~01/S>2~|~US30 19.16-21.55 minor rehab~|~05 - 4R Maintenance - Resurfacing~|~95268221F307E15AC9ADBAA3E8C9DF11F2723D92 96281~|~1~|~1~|~01/NFA~|~Full service maint facility in Ottawa.~|~17 - Construction Engineering~|~35F8FFE97DD3288603C5CABE31DC848D46F199B8 116637~|~1~|~1~|~01/NFP~|~Signal Replacements.~|~44 - Other~|~3F1A6C1E9426204EB11A40547B1E7D40F7516EA0 84656~|~1~|~1~|~01/IMS~|~IR77 7.51-6.97~|~~|~B633F8AE30C9C550D75AEAF714782E93B0F22722 84656~|~1~|~2~|~02/IMS~|~See linked structures >20' span.~|~~|~8435CE9F6770610875CEA86BA4B26D04721B9A86 84656~|~1~|~3~|~03/IMS~|~See linked structure 10' to 20' span.~|~~|~0EE642B77A8E4744B54F495B5A927FFA9280520D 109505~|~1~|~1~|~01/NFP~|~STA IML Containers Ohio, Inc. Ford Motorway extension.~|~01 - New Construction~|~95F22278BA168BFE9AC0C4AF3A112FE989F002B5 123682~|~1~|~1~|~01/STR~|~plan split for the bridge work~|~13 - Bridge Rehabilitation~|~9C7D693FB79C84D760631F331928A11BDB8B6C7D 124832~|~1~|~1~|~01/ENH~|~Funding to cover construction of bike trail~|~28 - Facilities for Pedestrians & Bicycles~|~BABDEAE401C29B2E5BA406655E7DDA37F1CB7923 99954~|~1~|~1~|~01/ENH~|~Construction of a 7 foot wide sidewalk on the east side of Montgomery Road from the Bethesda North Hospital main driveway to Weller Road.~|~28 - Facilities for Pedestrians & Bicycles~|~36BCAB3A6937F0B74F2E830E701F95C63289D80E 100623~|~1~|~1~|~01/IMS~|~Resurfacing of BEL-470 from IR 70 to SLM 6.54~|~05 - 4R Maintenance - Resurfacing~|~437826E372A463E7F896CCEEBDC6F9E7F4995007 96240~|~1~|~2~|~02/STR~|~Concrete deck overlay 8001952 UNI-38-0.21Concrete deck overlay & paint 8002010 UNI-38-3.21~|~13 - Bridge Rehabilitation~|~2B2B4B5C1AC8F5989DBD05474CB4DA7BE2B8D800 96240~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.00-7.61~|~05 - 4R Maintenance - Resurfacing~|~F096CD9CB76E29205895BACE14AED29F315A8A2A 121234~|~1~|~1~|~01/STR~|~Plan split for chip seals~|~05 - 4R Maintenance - Resurfacing~|~EE0600ED97A5546AE650A61BC1A1762E9E66A0F0 97438~|~1~|~1~|~01/SAE~|~This split is for all guardrail work. This split uses 100% HSIP funds SAC 4HB7. Any funds needed after the cap is reached will be provided by the Allen County Engineer.~|~21 - Safety~|~C8E99A74904AEB49866CD0964D2691714AEB0329 126641~|~1~|~1~|~01/CMQ/HUBB~|~Signal replacements/~|~21 - Safety~|~D0B0D3E75B7032E8D73D221A8272AE8EAD16AADF 105026~|~1~|~2~|~02/NHS~|~1.5" asphalt overlay on FAY US 35 from 17.56 to 24.02~|~05 - 4R Maintenance - Resurfacing~|~A26C904B56E5DC76160BC67CDDA9DF9B17B34E26 105026~|~1~|~3~|~03/NHS~|~Repair and Sealing on Structures: 2400510, 2400529, 2401002, 2400537, 2400669, 2400685, 2400731 2400766~|~47 - Bridge Preventive Maintenance~|~1312DDB50A0D422593E8800E6CD4F64B6A08963A 105026~|~1~|~1~|~01/NHS~|~Erosion Protection (slope repair, rock channel protection, etc.) along US-35 from approximately SLM 18.10 to 22.60. Funded by GSM program~|~05 - 4R Maintenance - Resurfacing~|~F832A4E0CCB9AA5ACB56F6B6871FE7777100675D 105026~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~C2EA5A1993DD1C666EE13FCB4E4C9C7477421EE4 95866~|~1~|~1~|~01/NFP~|~@ SLM 2.93 and SLM 3.04~|~~|~61D0FE7BE6E3841F769885F8819A821EC42903F2 109232~|~1~|~2~|~02/SAF~|~Includes safety improvements of lane modification, turn lane extensions, and signage/signal work near the I-71 interchange~|~21 - Safety~|~B1689D4E0881FC7ECC5AAA6C83EC693FA2A80CB4 109232~|~1~|~1~|~01/STR~|~Major 2 funded pavement replacement with District funds used beyond the Major 2 funds cap.~|~04 - Reconstruction - No Added Capacity~|~6E9B3A42DCC9D134F8389EF5B26C5487EC863B64 109232~|~1~|~3~|~03/SAF~|~Funding for Centerline Rumble Stripes and Longitudinal Joint Preparation~|~21 - Safety~|~B068941B6FAD188F722EC233A2DB89A7F4ED68B4 25552~|~1~|~4~|~04/S>2~|~Channel cleanout of #7707657, SSUMSR00162**C : 5.77, O M 040~|~13 - Bridge Rehabilitation~|~16742E9CE636C96CD9EFB3AE24FD5F2DB280F1A4 25552~|~1~|~3~|~03/S>2~|~Urban Paving segment in the City of Akron. SR162 from 5.62 to 7.26~|~05 - 4R Maintenance - Resurfacing~|~1B0C94C32956C118355275B0E85518976EF9527F 25552~|~1~|~1~|~01/S>2~|~Resurfacing SR-162 from 0.00 to 5.62 and SR162D from 0.00 to 0.08~|~05 - 4R Maintenance - Resurfacing~|~889CE55E7549F34EFF322035000633C26C6E3F9D 25552~|~1~|~2~|~02/MPO~|~Urban paving segment...SR162 from 5.62to 7.26. MPO is participating in partial and full depth repairs. Balance from the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~A3007C84D63C030587D3F985CE218B0E61E64151 104010~|~1~|~1~|~01/SAE~|~Replacement and application of new pavement markings on various county roads in Preble County.~|~21 - Safety~|~BC746463BC4A178BD3E0DD189E9D48AE583DE485 84595~|~1~|~1~|~01/NHS~|~Project entails painting railroad bridges HAM-562-0319 (sfn 3114120) and HAM-562-0319S (sfn 3114112).~|~13 - Bridge Rehabilitation~|~1D8FF445F1C220A44B2AE80EA9B519E85A2DE398 84595~|~1~|~2~|~02/IMS~|~Project entails painting railroad structures HAM-71-0752 (sfn 3114937), HAM-71-0774 (sfn 3114996), and HAM-71-0842 (sfn 3115208).~|~13 - Bridge Rehabilitation~|~4139BCC2DA004BD16C8CA00A727E92C7C8ECD059 114633~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~C1A17A080EAFB2C47B1E285A61D01D6451E5FC32 96970~|~1~|~2~|~02/IMS~|~Diamond grind and repair concrete pavement on MAH-IR 76 eastbound from SLM 7.05 to 8.65 and MAH-IR 80 from SLM 0.00 to 0.53. Also includes a small quantity in the westbound direction.~|~05 - 4R Maintenance - Resurfacing~|~A1394F0120F184AE5C8360BFD5E8D7448B1D0828 96970~|~1~|~1~|~01/IMS~|~Epoxy pavement markings on MAH IR 76 from 3.07 to 8.65 and MAH IR 80 from 0.00 to 3.90.~|~21 - Safety~|~B08AAAD15701601992E01AFF441D1A02E87F68DD 116581~|~1~|~1~|~01/IMS~|~Repair rear and forward abutments on structure FRA-270-22.65~|~47 - Bridge Preventive Maintenance~|~74313F648A42919FFBEA59FEC06007BC43D6888F 119956~|~1~|~1~|~01/STR~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~44EB5DB8B47472897AD13718B355E382D4807FBC 100964~|~1~|~1~|~01/S<2~|~Construct Sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~55040DB645B7062113037CCBCBF2FBF2CA1EA504 97355~|~1~|~1~|~01/NFP~|~Culvert Replacements~|~04 - Reconstruction - No Added Capacity~|~603B4EF12E0B7D63A13404F42E8D430F52BA4DB7 90939~|~1~|~1~|~01/BRO~|~District Allocation~|~13 - Bridge Rehabilitation~|~09F43C9CB0A36AFD8D7721A93C25FFE7266F596B 120928~|~1~|~1~|~01/SAF~|~Highway lighting.~|~21 - Safety~|~6DE96688B42730258B14AFF09494F2B4D1763A55 120902~|~1~|~1~|~01/STR~|~All work included in this split. Could not choose improvement code in Ellis, should be 47 Bridge Preventive Maintenance~|~47 - Bridge Preventive Maintenance~|~53620D66FD286B9E933D91E557EFD1BE6C5858F3 125528~|~1~|~1~|~01/SAF~|~Safety funded plan split for roundabout and necessary related scope~|~21 - Safety~|~C986873848E44589E406EF460E27594AF8B105B6 112414~|~1~|~1~|~01/SAF~|~RPM improvement project on various routes and sections in HOC Co. CEAO funded. Funded 100% Federal.~|~~|~7A470BDD95AF929BB82B0F6773EB9E3991ED2174 80514~|~1~|~1~|~01/BRF~|~3631559 HIG CR55 5.37 Intersect: Dodson CreekBrdg Replacement 80% Fed/20% Local Match 01/BRF/BR/HIG~|~10 - Bridge Replacement~|~ADB17291625C1A78B830B8BBDA7FD39F79685456 116382~|~1~|~1~|~01/S>2~|~Plan Split 1 - All Work.~|~21 - Safety~|~A90A18FEB2F221C3444416AB1B40DE1AAE836FA4 117361~|~1~|~1~|~01/BRF~|~Bridge rehabilitation. All work is included in this plan split. ~|~13 - Bridge Rehabilitation~|~766D151ABC47C8257F953759287498EBD4224669 113033~|~1~|~1~|~01/NHS~|~For microsurfacing on SR 12 in Hancock County on the NHS. Funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~08CEBCC1DB2A06E38CADA6F128C4418E8553F563 100045~|~1~|~1~|~01/CMQ~|~Re-striping of Montgomery Road from the Norwood corp. line (near Cypress Way) to the Sliverton corp. line (near Coleridge Avenue) from 6 lanes to 5 lanes (two through lanes in each direction and a center turn lane). Traffic signals will be upgraded to 12" LED signal heads. Two existing signals will be rebuilt.~|~21 - Safety~|~1FD5006E043C420ACEC53B97D2A65EA3EA683FDE 119119~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~8E7507BB39B6316B1170EA90BAC4A1EA01D50D82 126389~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~8D7D4206C0080EEC4EB818C12F196A3E389E41C3 122364~|~1~|~1~|~01/NFP~|~NEVI Round 2B - Corridor Group 275-A~|~~|~EFBFBE4812FAF27D3C6F5B2F3FA3B222993D2201 122364~|~1~|~2~|~02/NFA~|~NEVI Round 2 Corridor Group 275-A~|~~|~32D2716273EFFB71A864EDB14397CBEE453E896D 101834~|~1~|~1~|~01/S<2~|~Urbanized area HUR-99-2-4.49~|~05 - 4R Maintenance - Resurfacing~|~FA5EA969C7084FE608FB8EC7DBFC3ED6C97377AA 101834~|~1~|~2~|~02/STR~|~Rural HUR-99-4.49-12.77~|~05 - 4R Maintenance - Resurfacing~|~F82664FBFB7C4A4BCF0C66E973528BC83897DC42 123369~|~1~|~1~|~01/SAE~|~100% safety funded as part of target speed pilot program~|~17 - Construction Engineering~|~E8CCA7DAFE8C075BB4FBAF6402ABB66DDB60CA98 87902~|~1~|~3~|~03/STR~|~"O3/STR/OT/ " - District Preservation Program 4PF7(80% Federal) / 4PS7 (20% State) - No CAP - Fence Installation on 1) GUE US 40 14.29-14.48;~|~21 - Safety~|~44B76D9A0F497DF21BA1D870EC0C63214D2306DD 87902~|~1~|~4~|~04/NFA~|~"O4/NFA/OT/ " - State Safety Program 4BC7 (100% State) - CAP $20,000.00 - Guardrail Installation on 1) PER SR 188 01.12-01.23;~|~21 - Safety~|~497EAE1BAB1754B623539D4ADC0303843BEE966B 87902~|~1~|~2~|~02/NHS~|~"O2/NHS/OT/ " - Safety Program 4HJ7(100% Federal) - CAP is $875,000.00 - Guardrail upgrade on 1) GUE US22 11.12-30.95; 2) GUE SR209 14.49-14.59~|~21 - Safety~|~C906996BAF81B849D6422C40DFE5FB9595443E03 87902~|~1~|~1~|~01/NHS~|~"O1/NHS/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail upgrade on COS SR16 0-0.1~|~21 - Safety~|~DEC2428818E325874CF251E8304F1158C937ED91 112622~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing of Mahoning Ave from Meridian Rd to IR 680 in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~E8890F2CA4F64307AEB0C819BF3A23B0C3574F0E 122097~|~1~|~1~|~01/NFA/LIC~|~Licking County CEAO Federal/State Exchange Programs Funding - 4C87 (95% State) / LNTP (5% Local Match) - Replacement of LIC TR 243 04.38 (SNF 4536592).~|~10 - Bridge Replacement~|~D1D45460603174C95A3D235BD841491DDD6210CC 102991~|~1~|~1~|~01/BRO~|~Bridge replacement project. NOB 821 15.84 (SFN 6105734). BR eligible on rural federal aid. Funded 80 federal/20 state.~|~10 - Bridge Replacement~|~6CC06B4E8557E308A28317CAB555B7384BA965CF 110321~|~1~|~1~|~01/NHS~|~Culvert repair project using 80% Federal and 20% State funds on NHS system. ATH US 50 36.57~|~~|~1D968B2D1EE9940F9AC31CA119740DCB5AEC8F51 110321~|~1~|~2~|~02/NHS~|~Culvert repair project using PO. 80% Federal and 20% State funded on NHS system. ATH US 50 36.57.~|~17 - Construction Engineering~|~4B173C04DE7451039C01B7096329D011A67BACEB 105561~|~1~|~1~|~01/SAF~|~RPM~|~21 - Safety~|~6FE9E1EA0D643E8CF150BBF446DF6E3AECB55043 125185~|~1~|~1~|~01/SAF~|~Traffic signal and lighting replacements~|~21 - Safety~|~C3552A94E5CA782D72489DFA8D835BD51898E67F 113884~|~1~|~1~|~01/STR~|~Widen pavement & shoulders on both sides of the roadway to improve the usability and the safety of this facility.~|~03 - Reconstruction - Added Capacity~|~7D3339C5501A68DA643E1A268D48FFBA641DBE2F 94630~|~1~|~1~|~01/SAF/Twin~|~Signal upgrade. Widening of the North and South legs of State Route 91 to add left turn lanes at Creekside Drive, City of Twinsburg, Summit County, Ohio.~|~21 - Safety~|~21F52357B9BB89120EED7EAC5E9892F317D78DDF 113010~|~1~|~1~|~01/S<2~|~Contract to demolish a house. MEG Mill Street (CR 5) 0.35, in the Village of Middleport. DSR MEG-001. Funded 80 Federal/20 Local.~|~44 - Other~|~8B9992F16CC4275C2C90612682C01C179AB6D9C3 93938~|~1~|~1~|~01/IMS~|~Add second right turn lane on exit Ramp E from southbound I71 to Mason Montgomery Road. Improve cross slope for transition from Ramp E onto Mason Montgomery Road.~|~21 - Safety~|~274AB855CBF108F51320996DE783918DFC719D6A 101167~|~1~|~1~|~01/IMS~|~Overlay I-75 with asphalt concrete : AUG IR 75 SLM 0.00 to 4.51 = = SHE IR 75 SLM 18.83 to 20.55~|~05 - 4R Maintenance - Resurfacing~|~0A8EDE3380AF9958A8A44802ADD6DEF8859400CD 101167~|~1~|~2~|~02/NHS~|~Overlay with asphalt concrete: AUG US 33 SLM 14.92 to 16.51~|~05 - 4R Maintenance - Resurfacing~|~735DF173E428E2D895737C4D819CFA7215CF4120 118886~|~1~|~1~|~01/STR~|~Resurfacing SR 542~|~05 - 4R Maintenance - Resurfacing~|~EB48A4959794532E6DB26DF55DD3E7FF65505CC5 93761~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 556 0.00-13.24. 80/20% Federal/State.~|~05 - 4R Maintenance - Resurfacing~|~D678628972A7D71E58E710286C588943FDEC6972 106353~|~1~|~1~|~01/STR~|~HUR-60-10.78/HUR-99-08.04~|~04 - Reconstruction - No Added Capacity~|~1416F1143CA6AC004EFA3B171B13575A98367039 102856~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funding using SAC 4PS7.~|~21 - Safety~|~1294BC82CFC726C19E7EE87DE4AE86A073E1B3A4 105579~|~1~|~1~|~01/STR~|~Replace Bridge.~|~10 - Bridge Replacement~|~59C0B88099201D32BD89491E4029982C3FA670AF 110632~|~1~|~1~|~01/STR~|~Overlay on BRO 50~|~05 - 4R Maintenance - Resurfacing~|~709AC93328AEC7049AEE146F004C0964A46F18EE 90441~|~1~|~1~|~01/STR~|~Replace deteriorating culvert and improve alignment with minimum amount of approach road work on MER-SR-29 9.110 to 9.120 0.020~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~711E87BFA6AC263A5E92E3B50B979101F6748E1A 125910~|~1~|~1~|~01/NHS~|~establish pro rata percent~|~44 - Other~|~F37727E561192E36402E1EF6E7024508526A618E 113284~|~1~|~1~|~01/STR~|~Replacement of RIC-42-00.41~|~04 - Reconstruction - No Added Capacity~|~3DC7F0CB1FD33BF6A871F5C0F6754E23ED2DA2C2 113284~|~1~|~2~|~02/S<2~|~RIC SR 545 Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~ADB94FF5F003E9ED2F6EC8D41D012FF2FC10A8D0 120884~|~1~|~1~|~01/S50~|~Resurfacing on SR 117 and SR 309 using District Preservation Funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~FE906A1F53B85A642343B71F253C5B628FABFCCA 120884~|~1~|~2~|~02/NHS~|~All work on the NHS Route is within this split~|~05 - 4R Maintenance - Resurfacing~|~8780B63946A870865C4ED5149AE825DF01744692 120884~|~1~|~3~|~03/IMS~|~All pavement repair work on I-75.~|~47 - Bridge Preventive Maintenance~|~24AECA6F498CFF7570BCE712D6F2E1EEA2DA6EBB 97631~|~1~|~1~|~01/BRO~|~Innovative Bridge Program--bridge deck replacement on HUR-CR 52-3.08.~|~~|~3474C52209A95645FBB351CEDE483F74B548BA9D 120342~|~1~|~1~|~01/NFA~|~NEVI Round 2 - 77-A~|~63 - Electric Vehicles & Charging Infrastructure~|~72394C6E9FDAB9A9EF5DB265C4B2D7F46D6C8D2E 93341~|~1~|~1~|~01/IMS~|~Construct a type II noise barrier on I-475 between Corey and Woodley~|~01 - New Construction~|~E8234CD46F139BA14F4163DB15E9723DB198F7E2 119649~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~B2561773DBE85BD9704B7E05666204CF46B1BE20 13183~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1801775~|~10 - Bridge Replacement~|~383AE50923D264968D8E2082325E56F5E9DA3AF9 125993~|~1~|~1~|~01/NHS~|~Split~|~05 - 4R Maintenance - Resurfacing~|~EB18A0DB1BAB7602D0DBE896183D56DA7AB010A5 87180~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on IR 70 throughout Preble County.~|~~|~DAD074465FE197EC7D817AA1A14182C5E1E47B8F 104926~|~1~|~1~|~01/NFA~|~Rumpke truck replacement project~|~44 - Other~|~9D4D1F925A2741C9AC88251E56CEA7FB265E5DB4 119563~|~1~|~1~|~01/SAF~|~Split for guardrail work on the inside lanes, Safety Funding~|~21 - Safety~|~C98AE23787CA5D82AEB1F47F90B269BE90B2F4C1 119563~|~1~|~2~|~02/IMS~|~Split for guardrail work on outside lanes not covered by the safety allocation to be funded with district allocation.~|~21 - Safety~|~F64FF797CCBA4240B376C8FF2B669773C8FCAC82 123153~|~1~|~1~|~01/STR~|~District wide culvert replacements.~|~17 - Construction Engineering~|~0FF9C6B4009D8678C140142A83CD7637CCA560BF 108175~|~1~|~1~|~01/IMS~|~ER Event - repair landslide that occurred along EB IR-275~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C940914FE56ADF15B9C0EDBFF31E853C0C3D12AB 98928~|~2~|~2~|~02/STR~|~STP RURAL~|~~|~050AD9C20D5934499403D6617B10701207B87CC5 98928~|~1~|~1~|~01/NHS~|~NHS~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54B883DF22D9FAD1EABCB99C3B29188763EC0592 122105~|~1~|~1~|~01/STR~|~Bridge replacement~|~10 - Bridge Replacement~|~1D48358536C4D7071B1064B1CC4125397EC267C2 121592~|~1~|~1~|~01/S>2~|~STP > 200,000 Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~8012555BBAD6DC99015FEB95B60AB9A8A6C46328 96349~|~1~|~1~|~01/S<2~|~District Preservation Bridge Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Bridge rehabilitation: 1) SFN 6000339, MUS-22-4.67 carrying US 40 over Jonathan Creek. Not BR Eligible for Rehabilitation: Length=106; SD/FO = (0); SR = 82.6; DSR = 7;~|~13 - Bridge Rehabilitation~|~318111C267843173C03CA5EC6F8830A88E9D109B 96349~|~2~|~2~|~02/S<2~|~District Preservation Bridge Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Bridge Replacement: 1) SFN 6000398 MUS-22-8.71 carrying US 22 over Shawnee Run . Not BR Eligible for Rehabilitation: Length=31; SD/FO = (0); SR = 70.6; DSR = 5;~|~10 - Bridge Replacement~|~A4B36E8C66F5622391372033D32EDA06D0BAFFAE 121637~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B89BAC9974E770915C9F20335ECA9B6FD57E6729 116565~|~1~|~1~|~01/NHS~|~plan split for bridge work~|~13 - Bridge Rehabilitation~|~A83C447E5EAAE25CA489C912BFE8A61D6A470210 88567~|~1~|~1~|~01/NFA~|~HEN-18 from SLM 0.00 to 9.96)~|~05 - 4R Maintenance - Resurfacing~|~3BC495D3230ADF4B9ACD6946426822AD120943D9 120808~|~1~|~1~|~01/STR~|~Reactive Pavement Maintenance.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~62F8AE12A88F35A737E1B7DD2C57A91ACFB35061 120616~|~1~|~1~|~01/NHS~|~Plan split for Urban Paving eligible scope~|~05 - 4R Maintenance - Resurfacing~|~0FE3661B963D7F95B560269B41D5E6C6EE71768E 120616~|~1~|~2~|~02/NHS~|~Plan Split for 100% locally funded scope.~|~05 - 4R Maintenance - Resurfacing~|~015C283FC5FEE849BB2D8FEEE40C88DADB648A34 109261~|~1~|~1~|~01/NFP~|~Chips~|~05 - 4R Maintenance - Resurfacing~|~AF418DBCCAD82FE5A43C4CC304A7C5CBD71EC9E0 108012~|~1~|~1~|~01/NHS~|~Lighting~|~44 - Other~|~5C3C1E48EEDAF2D510ABA5C64A90624A5F1C8FB0 116968~|~1~|~1~|~01/STR~|~WAS SR 60 15.44 CFN 1877880~|~04 - Reconstruction - No Added Capacity~|~8331D4C89B1499D89EF45FF69E3A0EE31D704BB0 98147~|~1~|~1~|~01/CMQ~|~Reconstruct three traffic signals in downtown Franklin (Second Street at Riley, Second Street at Main, and Second Street at River Street) with new mast arm signal poles, illuminated signs and Traffic Management Cameras. The intersections will be incorporated into a traffic-responsive closed loop system with fiber optic and radio interconnect across the Great Miami River to Second Street and Miami Ave. The fiber optic cable will be routed into the City Building on Benjamin Way, adjacent to Riley Boulevard.~|~44 - Other~|~5A4E45DA5E8421BEE4BD16E4E50F97AB80D91F58 123472~|~1~|~1~|~01/MPO~|~Construction of the East Broad Street Capital Trail, a road diet on East Broad Street and the reconstruction of 6 traffic signals.~|~28 - Facilities for Pedestrians & Bicycles~|~43F00B4C361790C42C939A4B186A84A84073C1BB 105353~|~1~|~1~|~01/S<2~|~Large City Eligible~|~05 - 4R Maintenance - Resurfacing~|~0D0BAFD2DD06F9C51751DAE515FCFE838E0EA11F 105353~|~1~|~2~|~02/NFP~|~County Section, 100% LPA paid~|~~|~1A1AA1BA22B6C4B05467D27B975AC496D76AA6FD 105353~|~1~|~3~|~03/S<2~|~Non-eligible items. 100% LPA~|~17 - Construction Engineering~|~2DE6024E9F492DF1C7AE215D251ED9445DE6F6E3 120060~|~1~|~1~|~01/NFA~|~Resurfacing in Jefferson Lake State Park~|~05 - 4R Maintenance - Resurfacing~|~D7DC980721D0F7EA82C5A85442115F97B9BE503F 106352~|~1~|~1~|~01/SAE~|~Federal eligible work to install ADA ramps, sidewalk and curb, pedestrian signals, and pavement markings adjacent to public schools to increase safety while walking or biking to school~|~21 - Safety~|~F7F9172341EA577B17F09DC17DE058766ADFD6E6 110559~|~1~|~1~|~01/S>2~|~Rehabiltate the Bridges that carry SR 122 over the Great miami River and the overflow channel by replacing the expansion joints, upgrading the barriers, painting the structural steel and replacing bearings under the intermiediate expansion joints. Remove Debris from the main channel and consider debris mitigation such as upstream debris deflectors, channel excavation, etc.~|~13 - Bridge Rehabilitation~|~A7E59992FD576DB14A9659F1029AECFE4ECA0604 110559~|~1~|~2~|~02/SAF~|~The City of Middletown will be paying for the light pole foundations and bump-outs on the bridge parapets.~|~21 - Safety~|~AB3E26762958A21D9AE25472CDFAE587DEC3AEBE 110559~|~1~|~3~|~03/S>2~|~Resurfacing BUT-SR-122 SLM 6.17 to 6.25~|~05 - 4R Maintenance - Resurfacing~|~EDCB81B07DF675E709373342854ABA660469F1B9 110559~|~1~|~4~|~04/S>2~|~Pavement repairs to be paid by Local.~|~05 - 4R Maintenance - Resurfacing~|~06E6EC734CDD8F80545766A8DBE7A7A813BD932F 110559~|~1~|~5~|~05/S5K~|~Plan Split for the retroactive change order for fuel price adjustment~|~13 - Bridge Rehabilitation~|~789AB046B1017C850AED439A29A5EB247B88892A 99789~|~1~|~1~|~01/MPO~|~Construction funding to install new or replace existing interconnect within Bexley.~|~21 - Safety~|~37037F599E17E09AF9219CE2F40C530DB7F8E7C8 99789~|~1~|~2~|~02/NHS~|~Items to be paid 100% by the City of Bexley~|~21 - Safety~|~BBBCB3331A03A74249F88BB151A34790D89625AE 103161~|~1~|~2~|~02/BRO~|~Split for work on the SR-10 bridge~|~13 - Bridge Rehabilitation~|~0BA392EFB294869E592DD87F8CB0F8FFDDE1CAC3 103161~|~1~|~1~|~01/IMS~|~Split for work on the interstate bridges~|~13 - Bridge Rehabilitation~|~B2B453BBF96FB59A749FC87D0B08674127E3E3FD 103161~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~D68A58A00E4A24CA7AF79DC9A2D56A642781A221 92426~|~1~|~2~|~02/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~A4F094948C815891FB8C161A164C1D72F02AB029 92426~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~D5A16340951160B0DA8AF9DC8CD572616C26028B 115976~|~1~|~1~|~01/S>2~|~This plan split covers all work associated with improving SR-32 and constructing a shared use path from Valley & Round Bottom to the eastern corp. limit of Newtown~|~03 - Reconstruction - Added Capacity~|~4CD39D82590DBDD76D1C3EF76E56AAD2E7AB6F55 20383~|~1~|~1~|~01/STR~|~BR Funds eligible Bridge Replacement~|~10 - Bridge Replacement~|~69F80C44E0C4331B8A308A39F995D2061108BC25 93660~|~1~|~1~|~01/MPO~|~Rehab - lane and shoulder widening~|~04 - Reconstruction - No Added Capacity~|~4733EDEB703397FC1A44C54A45D25297DD649F78 92759~|~1~|~1~|~01/SAF~|~D09 Pavement Markings (B)100% state~|~21 - Safety~|~B93D488B7AB47142C446C7EB474D0B9233B3642E 105436~|~1~|~1~|~01/NFP~|~All work in this project. 100% state funds from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~455CD79A99688CFD75C1AF9D447D5F19826302C3 82267~|~1~|~1~|~01/NHS~|~District Allocation~|~21 - Safety~|~40F678ED14A7E400402D9462F79B5E9C10C8CEEC 119917~|~1~|~1~|~01/BRO~|~Increase resiliency of bridge carrying SR 149 over Little McMahon Creek by repairing drilled shafts and placing Rock Channel Protection.~|~47 - Bridge Preventive Maintenance~|~3B45131948B6A5FCF7D7E3D329A1DDF4D256EA4D 91467~|~1~|~2~|~02/SAF~|~Plan Split for all waterworks on Hopkins Road.~|~21 - Safety~|~36C93B85291641997F91C9EB5B6A84EB1C20A79A 91467~|~1~|~1~|~01/SAF~|~ Install left turn lane on US22 from 0.1 miles west to 0.2 miles east of Hopkins Road.~|~21 - Safety~|~E5AC703067C1FC8D008E6B0D4FC7EF5720985CC5 98272~|~1~|~1~|~01/STR~|~STP Rural Microsurfacing: WAY SR 0003 03.85-08.67, ERI SR 0061 00.00-01.74, MED US 0042 07.12-14.40,ASD SR 0511 06.92-10.96, ASD SR 0096 00.00-03.52, WAY SR 0057 00.00-01.25, WAY SR 0057 05.00-10.66~|~05 - 4R Maintenance - Resurfacing~|~9200CEB428D67FD5464B494E799143FF18532BB0 98272~|~1~|~2~|~02/S<2~|~STP<200,000 Microsurfacing WAY SR 0003 08.67-09.07, ASD SR 0511C 00.00-00.04, ASD SR 0511 10.96-11.17, ASD SR 0096 03.52-03.91~|~05 - 4R Maintenance - Resurfacing~|~98A5D82CBFF095C631342D9331CEB41454DDA008 103925~|~1~|~1~|~01/STR~|~Culvert Replacement: ASD-60-9.95~|~04 - Reconstruction - No Added Capacity~|~F0175A8B551D41AA58201DA36D3E8E8CB7798C89 102947~|~1~|~1~|~01/NFP~|~Tree/bush removal, pruning~|~44 - Other~|~8FFEBDCC91F258ECA45D3F8C6C479F7833704FE4 92436~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - District Preservation 4PS7(100% State) - No CAP - Replacement of 1) 1603132 COS SR751 6.58 Intersect: Mineacid Run; Not BR Eligible for Replacement: Length=25 SD/FO(1) SR=62.8 DSR=6;~|~10 - Bridge Replacement~|~524D36AAAE4190E29B4AA9710CDEB79399C4C269 92436~|~2~|~2~|~02/NFP~|~"02/NFP/BR/ " - District Preservation 4PS7(100% State) - No CAP - Replacement of 1) 1603159 COS SR751 9.05 Intersect: Trib Of Evans Creek; Not BR Eligible for Replacement: Length=15 SD/FO(0) SR=88.8 DSR=6;~|~10 - Bridge Replacement~|~5C443C502BCAB1E5BDAE736FC073B887598CAEA8 92178~|~1~|~1~|~01/IMS~|~100% state preservation funds~|~21 - Safety~|~2C33CA83A49334C6DCC4B858999DC2C825FB97CF 113224~|~1~|~1~|~01/ENH~|~Plan split for federally elligible items within construction and construction engineering.~|~28 - Facilities for Pedestrians & Bicycles~|~5DA6AAAD9D7AB07FAB89DA39AF15E5D04B7D3C6E 113224~|~1~|~2~|~02/NHS~|~Water main 100% Local~|~~|~E8F976040BD1239DF51D8F3B617B1FB67F918A51 113470~|~1~|~1~|~01/BRF~|~Replacement of linked structure > 20' span.~|~10 - Bridge Replacement~|~0F5F313540C4945FD51D9E88EDFEA428FFBFD562 85370~|~1~|~1~|~01/NHS~|~Federal Earmark OH027 - 100% Federal (4R27) - CAP (See CAP Comment) - Installation of partial interchange lighting at US 33/Hill-Diley Interchange.~|~21 - Safety~|~77089C1F1A396B4F1FEABB348309A86F09530FDC 85898~|~1~|~1~|~01/NFP~|~construction cost of new facility~|~44 - Other~|~C9CAD5A8660DBD82FC4FC359228E2FD1C7E939D4 91553~|~1~|~1~|~01/STR~|~Deck replacement.Located 1.53 miles West of Lawrence County Line on SR140 7304595 SCI SR140 15.07 Intersect: Jacksons Fork80 Fed/20 State. 01/STR/BR/State~|~13 - Bridge Rehabilitation~|~E46F1657B74F532DA30BF01A9568BC877FF62A0A 108137~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8~|~21 - Safety~|~4E437A6418BC3910FA274D729C7649F709EB9D9B 108137~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7.~|~21 - Safety~|~EF243E5A3B3003675A5DE08BD96877567F80CE1E 101708~|~1~|~1~|~01/NFP~|~Statewide ITS/FMS maintenance contract~|~44 - Other~|~FED7B538CE948E4E63E736DBF376AC2915D0F4EC 120514~|~1~|~1~|~01/NFP~|~added plan split for Jobs and Commerce sign installation.~|~21 - Safety~|~1D1609542CE01C66A2271C0252CB946F848B62C9 99653~|~1~|~1~|~01/NHS~|~Bridge repair using heat straightening on MEG 833 4.89, SFN 5300894. Emergency Type C project. NHS route funded 100% state.~|~13 - Bridge Rehabilitation~|~C7968053E8357807A32994E69F16C15A8E54A0DE 96901~|~1~|~1~|~01/NFA/ADA~|~Plan Splits. 100% Fed. CEAO~|~21 - Safety~|~1F51DF5A728712A0FA7C1DAE04B55B7C5F889853 113278~|~1~|~1~|~01/SAF/AKRO~|~Safety improvements at various intersections in the City of Akron. Improvements will include enhancements to pavement markings, signage, roadway features (median, curb ramps, sidewalk) and signals.~|~21 - Safety~|~B2DA0831A45B66E5173D95D87CF0EECFF65983EE 113278~|~1~|~2~|~02/SAF/CANT~|~Safety improvements at various intersections in the City of Canton. Improvements will include enhancements to pavement markings, signage, roadway features (median, curb ramps, sidewalk) and signals.~|~21 - Safety~|~7D5D4C2DC8E5480D1557EB0428CE809E3590948D 113278~|~1~|~3~|~03/SAF/YOUN~|~Safety improvements at various intersections in the City of Youngstown. Improvements will include enhancements to pavement markings, signage, roadway features (median, curb ramps, sidewalk) and signals.~|~21 - Safety~|~3717CDF128EAA0DF212483AAB59312B38C287DB9 116308~|~1~|~1~|~01/IMS~|~CFNs 1808604 and 1852247 have been linked to IMS plan split~|~04 - Reconstruction - No Added Capacity~|~7277D6B7EC55A3F33F6B9B0BE1B00FD25200690E 99684~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~9B20B407A4D9F9CB29C693343E00E5A595759270 126757~|~1~|~1~|~01/SAF~|~Plan split for CEAO HSIP funding~|~21 - Safety~|~2F9E01FF46ECD43DF358DF43D3AF5E86959F429C 110116~|~1~|~3~|~03/STR~|~This plan split is for the rural routes: portion of CLE-28 and WAR-28.~|~05 - 4R Maintenance - Resurfacing~|~055E30F77B9490978E6B138900CF30E6DC6C4590 110116~|~1~|~1~|~01/NHS~|~This plan split is for the NHS routes: CLE-52~|~05 - 4R Maintenance - Resurfacing~|~349665EC95D580E9584A977D82704B254B7EA3BF 110116~|~1~|~2~|~02/S>2~|~This plan split is for the Large Urban routes: portion of CLE-28~|~05 - 4R Maintenance - Resurfacing~|~31400004AF464AC48D48FD5476F601333111485F 122297~|~1~|~1~|~01/STR~|~Plan split for bridge replacement~|~10 - Bridge Replacement~|~86B6CF0DE8497201A61683D7B4A514B4DA2F099F 92673~|~1~|~1~|~01/STR~|~ON SR 121 berm stabilization, pavement planing and resurfacing of the existing roadway with asphalt concrete on DAR SR 121 DAR/PRE County Line (SLM 0.00) to North Corp Limit of the Village of New Madison (SLM 5.64).ON SR 726 resurface the existing roadway with asphalt concrete DAR/PRE County Line (SLM 0.00) to SR 121 (SLM 4.33)(OC 000)~|~05 - 4R Maintenance - Resurfacing~|~750961A124B915CB685171D626691979DAEFAFE9 92088~|~1~|~1~|~01/BRO~|~8702462 WOO SR64 12.13 Intersect: Maumee River~|~10 - Bridge Replacement~|~DA75AE4600441EEBDEF72175B1F7C6123B76FD5E 92088~|~1~|~2~|~02/MPO~|~This is for the intersection improvement of SR-64 and River Rd.~|~21 - Safety~|~F622805278CFD2B29DB9DC8ADDCB2BF87BC47D6D 92088~|~1~|~3~|~03/NFA~|~Split for Utility Conduits - Spectrum - 2 of 6 conduits on bridge~|~10 - Bridge Replacement~|~85FD350C369C0B9EF33C02E5237CB68297191181 92088~|~1~|~4~|~04/NFA~|~Utility Conduit Split for CenturyLink - 2 of 6 conduits~|~10 - Bridge Replacement~|~E844256FB127C13980B5A84B7BBFA1A13EE211E5 92088~|~1~|~5~|~05/NFA~|~Utility Conduit Split for Buckeye Broadband - 1 of 6 conduits~|~10 - Bridge Replacement~|~F0EE0536A1BE11DD46096BC29B5069D867F26768 92088~|~1~|~6~|~06/NFA~|~Utility Conduit Split for Northern Buckeye Educational Council - 1 of 6 conduits~|~10 - Bridge Replacement~|~F738B15B689035A6E7857C62222B431B72885F17 92088~|~1~|~7~|~07/S>2~|~Urban Paving Split - paving added by change order will use this funding code. Luc SR 64 SLMs 0.03 to 0.32~|~05 - 4R Maintenance - Resurfacing~|~966FE246FD97069821C8BF876358B466238F21F6 96788~|~1~|~1~|~01/NHS~|~General System Resurfacing on COL-30 and COL-154 including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~1EC532E5725D1B02EA6999B0B2E648750063A0F2 93643~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. VIN 327 6.89-13.56. Federal 80%/State 20% STP Rural.~|~05 - 4R Maintenance - Resurfacing~|~5400C05B08B97D76D67FD5DDEFC96E52E022B0F5 83827~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 677 0.00-4.78. Rural other federal aid using 80 federal/20 state funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1D610C8412806DD8B82A47465671DE89BA62CA57 98401~|~1~|~1~|~01/NHS/ASHT~|~Resurfacing ATB US 20 from 11.02 to 11.83 in the City of Ashtabula.~|~~|~8889A369B1C3CFD5D4CDF6B20B20A94351984373 101042~|~1~|~1~|~01/STR~|~STA SR 44 from 0.00 to 7.84STA SR 171 from 0.00 to 1.00~|~05 - 4R Maintenance - Resurfacing~|~1E202726D5C937B8D4851F15DEFD336BB5CBAF10 125618~|~1~|~1~|~01/NFA/MUSK~|~Replacement of the existing structure (SFN 6032672) on Township Road 383 in Muskingum County.~|~10 - Bridge Replacement~|~3BBB49A14E8A2DD4D39585461A99AC0FBB7A56E2 119308~|~1~|~1~|~01/SAE/GCEO~|~Installation of guardrail at various routes in Greene County~|~21 - Safety~|~63864FA39BF30E691BB979A188E15E2B10AB7CF9 106257~|~1~|~1~|~01/STR~|~Work funded with funds from the District Preservation Program budget. No local funds. The District has committed to pay for the top 3 inches of asphalt on SR 103. The District will also pay for pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~98AD427602FF3D7F0D80642B2EFAD1388143FD1E 106257~|~1~|~2~|~02/STR~|~This is for all the project not funded with funds from the District Preservation Program budget. Currently it is unfunded. After funds are received the work may be in more than one split.~|~04 - Reconstruction - No Added Capacity~|~6D0D15749A26A765EE0B64C64411B1DB48982CA5 87507~|~1~|~1~|~01/S>2~|~Project includes minor widening, pavement rehabilitation, access management involving realignment of driveways, new sidewalks, ADA compliant ramps, curb replacement, retaining wall, replacement of signage, replacement of catch basins and storm sewer, and reconstruction of the existing traffic signal at the intersection of Towne Blvd. and Village Dr.~|~04 - Reconstruction - No Added Capacity~|~0495E2035179698F5D449E6FCCC1149A2EB20D85 105260~|~1~|~1~|~01/NHS~|~Plan split for bridge painting work~|~47 - Bridge Preventive Maintenance~|~B129D622E1C5BC60DFA47A9EEAE7B2E40B22810C 105260~|~1~|~2~|~02/IMS~|~Added plan split for interstate structure~|~47 - Bridge Preventive Maintenance~|~B679662DA011D21635C4B6634D3E5431A270433E 109800~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - No CAP - 80% Federal (4PS7) and 20% State - resurfacing and related work on KNO-36-20.85 to 29.50 and KNO-36C-0.00 to 0.12~|~05 - 4R Maintenance - Resurfacing~|~10D0FD4B4EE508B117217158F03E03E7CAF018D0 109800~|~1~|~2~|~02/S5K~|~02/S<2/PV/ - Plan SPlit 2 for work on KNO-36-20.82 to 20.85~|~05 - 4R Maintenance - Resurfacing~|~2771CA5B8B893CF6C808161A75E3E593FF99B0FE 107664~|~1~|~1~|~01/NHS~|~Replace deck on continuous steel beam bridge BEL-7-2591 (SFN 0700827) and repair substructure units. Replace bearings and paint beam ends.~|~13 - Bridge Rehabilitation~|~6758E4C8D440E43937669DA63DB73CA77DAA1BAE 88430~|~1~|~1~|~01/SAF~|~Safe Routes to School funding for Hague Ave RR pedestrian crossing, Hague Ave shared use path, Valleyview shared use path~|~21 - Safety~|~B2DF4FE5269E935E77432C3DAFD27137A5A01576 88430~|~1~|~2~|~02/S>2~|~Local funding (FRA County Eng Office) for bridge replacement on Hague Ave~|~21 - Safety~|~D3AA2AED1E8AB5B3B044A31ACACB93D7DF7FE91E 84818~|~1~|~1~|~01/BRF~|~Remove existing bridge and place a new precast, reinforced, non-composite box beam deck superstructure on reinforced concrete, stub, capped pile abutments while completing associated roadway approach reconstruction on Watkins Road in Mercer County SFN 5443059 MER CR 10 1012~|~10 - Bridge Replacement~|~0177634B62A221B75B5B39A88677156718E86442 117127~|~1~|~1~|~01/ENH/GAMB~|~"01/ENH/OT/GAMB" - construction of shared use pathway.~|~17 - Construction Engineering~|~A2408FB0A6395496E4CC1ED5587915478E2AED8C 116270~|~1~|~1~|~01/NFA~|~Chip Seal in Brown County.~|~05 - 4R Maintenance - Resurfacing~|~56584B762ED01121D0B69F54B2C0EA82DD2B5570 92947~|~1~|~1~|~01/NFP~|~Culvert replacements on various routes throughout Stark County, Ohio.~|~44 - Other~|~A741BA8D6577658A33DAB8D9A0C85F9029140EEB 84867~|~1~|~1~|~01/IMS~|~Partial depth pavement repairs from SLM 0.00-14.9801/IMS/PV/~|~05 - 4R Maintenance - Resurfacing~|~98FD95B6CEFBF5B81DE51893249C54B1B21CCAE4 125378~|~1~|~1~|~01/SAF~|~Traffic Signal Maintenance~|~21 - Safety~|~533AD45334E0F851CA0A68C43900C2C120C351B8 124696~|~1~|~1~|~01/SAF~|~Reconfigure Cassady Ave from Demonye Rd to Plaza Properties Blvd. Improvements include widening for a median between Airport Dr and Plaza Properties Blvd, signal improvements, SUP, sidewalk, and restriping. A dual SBL turn lane will be installed at Airport Dr and dual receiving lanes are proposed on the 670 entrance ramp. The off ramp will be modified to include a dedicated right turn lane. The intersection of Airport Dr and Cassady Ave will be aligned to alleviate the offset. ~|~21 - Safety~|~150EAF9DC4BDB5DD87EB32D7DE9D80B0C3379725 89408~|~1~|~1~|~01/IMS~|~Plan split for all paving work.~|~05 - 4R Maintenance - Resurfacing~|~4EB272E802DCA242CB275687BE98534C2B44855E 126662~|~1~|~1~|~01/NHS~|~Bridge repair~|~47 - Bridge Preventive Maintenance~|~9A7EE083DD48940206156BDE0C4F411F2616D157 124880~|~1~|~1~|~01/MPO~|~Plan Split for construction of a shared use path using NOACA TLCI funding~|~28 - Facilities for Pedestrians & Bicycles~|~2195076010B3C41FAEA87A67B7645709329441A6 117014~|~1~|~1~|~01/MPO/XEN~|~Mill and resurfacing of E. Market Street from N. Detroit Street to N. Columbus Street with pavement repairs. Sidewalk and curb repair.~|~05 - 4R Maintenance - Resurfacing~|~4210DC69A242A16CAF22594BEF3B72CB8416C34E 123546~|~1~|~1~|~01/NFP~|~added RPM 31~|~21 - Safety~|~27F025018D1C697D2D26D84EED84015A9C660E70 113169~|~1~|~1~|~01/MPO/MUNR~|~Resurfacing of Munroe Falls Ave from W Corp Limit to Main St (SR 91) in the City of Munroe Falls.~|~05 - 4R Maintenance - Resurfacing~|~B13BDEEF7A65B7012BB48BC3D394BDEAE81CFAAA 116727~|~1~|~1~|~01/SAE~|~Install and upgrade guardrail on various county roads in Seneca County.~|~21 - Safety~|~12E27F5B99D2F069EBF4642281D26D321F7F3554 123725~|~1~|~1~|~01/SAF~|~Sign replacement.~|~21 - Safety~|~7071D8F19FBB4820BE6AC787B6945F0A4F2D0133 91887~|~1~|~1~|~01/NHS~|~Resurfacing ATB SR 11 from 0.00 to 8.05.~|~05 - 4R Maintenance - Resurfacing~|~0BC2BB4F2E13C3510E702EF7EEC539795EBA1BC3 91887~|~1~|~2~|~02/NHS~|~Resurfacing of ATB SR 11 rest area parking lot and ramps.~|~05 - 4R Maintenance - Resurfacing~|~1B1DEBFBEF0A5844F012F9FA11C4B54FACA65963 99856~|~1~|~1~|~01/ENH~|~Construction of a sidewalk on the north side of Montgomery Road (US-22/SR-3) from Galbraith Road to Sturbridge Drive. Sidewalk to be constructed against curb and improvements require adjustment of driveway profiles and construction of retaining walls as needed.~|~~|~DB91CFE12E978FB9C4FEAE2DA2FA9A91BA130EF7 95148~|~1~|~1~|~01/NFP~|~District Preservation Fast Dry Pavement Markings - 4PS7 (100% State) - No CAP - District Wide application of fast dry auxillary markings.~|~21 - Safety~|~21376AC328D65E847DEACD73AFF577C67B3F0D9A 93510~|~1~|~1~|~01/NFA~|~Improve turning radii at intersection of MRG SR 60 and MRG TR 275 0.00-0.09 (Buttermilk Hill Rd). Rehabilitate pavement including minor widening for 0.09 mi. along TR 275. Work includes improving commercial drive for an improved turning radius for trucks.~|~21 - Safety~|~CE5777D96F278F021C0BEBC923D6224B11609601 120486~|~1~|~1~|~01/S5K~|~Crosswalk~|~21 - Safety~|~82D9F6F0B751B6296849931C464222AC5289D77A 94294~|~1~|~1~|~01/NFP~|~Construct a mixing shed and a salt storage facility at NOB M&R Garage.~|~44 - Other~|~D83BC15B3030A4EECB07F814D058AD20C0624C2E 98636~|~1~|~1~|~01/STR~|~SFN 1100718, CHP-36-0804 - change from hard deck overlay to New Bridge (discussed with Lee on 7/8/14 agrred to modify to composit box beam superstructure replacement only.)~|~13 - Bridge Rehabilitation~|~922D5FDCBCAD17ED1302809689208AA6F64992D8 98636~|~1~|~2~|~02/STR~|~Future change order work.~|~13 - Bridge Rehabilitation~|~E080FE2B414C04653A5C920AF215F2AD69829848 110064~|~1~|~1~|~01/S<2~|~Landslide repair project. GAL 588 11.10. 100% State ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B9E20EF0AE2BC5F337BFBBA1D68AC23FA6ECF6A1 115453~|~1~|~1~|~01/SAF~|~safety pedestrian improvements~|~28 - Facilities for Pedestrians & Bicycles~|~09BF5236C6ECA67960EE38D356506FC6BA76C548 109485~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~7CC2200507C0AA102ADA29094BEB8AA185982443 101466~|~1~|~1~|~01/STR~|~Pavement Marking~|~21 - Safety~|~95DDDF6EA354672B0E98BA82AC621D24B46F3C3A 122678~|~1~|~1~|~01/SAF~|~Installation of median cable barrier.~|~21 - Safety~|~A8ACD4F107106F122441FF4C83D54DD12B5F6D59 109828~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements.~|~21 - Safety~|~50B952E8DC42264E956BDCFF0BF49226767E063D 88849~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~9F21751BACC50814EE95B075086F6B3DC36F6E64 88849~|~1~|~2~|~02/STR~|~Culvert Repair~|~44 - Other~|~DB7587A6B7EE0B08EC3FF9860AFB0550001BC570 91967~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of HAS-151-0.00 to 4.58; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~A079DA939B8513E27AFE56AFE7D6F9B2FBE00D76 123784~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~5E799714EE4BCC76D52C447A52FF2D8F57F08732 84658~|~1~|~3~|~03/NHS~|~See linked bridges.~|~13 - Bridge Rehabilitation~|~1CCBC29238AB4141513869472AC4D16B7253B8A1 84658~|~1~|~2~|~02/S>2~|~Fine graded polymer asphalt overlay to SUM SR 303 from 10.00 to 10.57.~|~05 - 4R Maintenance - Resurfacing~|~AE77624726CA548B941EC7371D65CAAC27DF59D6 84658~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay for SUM SR 8 from 4.31 to 7.98.~|~05 - 4R Maintenance - Resurfacing~|~BE59A3B7C03DF8C71316BEFAC687432375F4D5B2 84658~|~1~|~4~|~04/NHS/AKRO~|~Micro-surfacing of State Route 261 between North Main Street (SLM 11.33) to State Route 8 (SLM 11.87), in the City of Akron, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~609861B3532C7BA81019F871FA0621E2071E7B32 109035~|~1~|~1~|~01/NFP~|~J&C project~|~21 - Safety~|~CD51C161E4AF7F6D468C7FB56A94AA079309D60D 95744~|~1~|~1~|~01/NHS~|~HEN-6 from SLM 0.00 to SLM 10.94~|~05 - 4R Maintenance - Resurfacing~|~843B62B4B3EC8A127751171FD557E115AF290E68 95744~|~1~|~2~|~02/STR~|~SR-34~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F1DAA0CA77DE9999FBBCA260C7E7ABAB9AA4C1EF 123641~|~1~|~1~|~01/NFP~|~Plan split for sign maintenance, repair or replacement~|~21 - Safety~|~DABC9755EABC637CFF827444C5387987E663208A 92789~|~1~|~1~|~01/NFA~|~Part 1 HIG CR5 14.29 - 18.77 It is proposed on CR5 to use HSIP funds to widen the pavement, widen the RW to remove fixed objects, and widen the narrow culverts from SLM 14.29 to 18.77. 80 Fed/20% local match by Highland County~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1DDF1E03C798365DB7D8D2EBF740AAFD4CCC292A 92789~|~1~|~2~|~02/STR~|~Part 2, on SR73, SLM 14.96 - 15.34, at its the intersection with Prospect Road, it is proposed to improve the sight distance and stopping sight distance of this intersection by correcting the vertical curves located in advance of this intersection. 80/20 using perservation funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7149FB890BEB7E1C9D256E9AF9F5E71EB59AC2D0 109030~|~1~|~1~|~01/NHS~|~Conduit Work:WAY US 0250 28.64 CFN 1981036:SPOT TREATMENTS~|~04 - Reconstruction - No Added Capacity~|~01E3BB16B6082389FA8EDAFEA0000A5B351F62BA 109042~|~1~|~1~|~01/NHS~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F935BB06AEB0A9039DBDE9819856C79EDC8E0A2D 95472~|~1~|~1~|~01/IMS~|~Intallation of tower lighting at the Interchange of IR-90 and SR-11 in Plymouth Township, Ashtabula County, Ohio.~|~21 - Safety~|~0FAC8AC040D34A633D5C8DE290772248074BFD49 86934~|~1~|~3~|~03/S>2~|~Resurfacing SR 93 from 5.84 to 6.38.~|~05 - 4R Maintenance - Resurfacing~|~24AF21090BA2FC4FCDEBAB6467434DF28E091F8E 86934~|~1~|~2~|~02/NHS~|~Catch Basin Repair on US 30 from 0.36 to 12.60.~|~44 - Other~|~419CABABBEBE9A66D6849430EA06B9E7524B8EE1 86934~|~1~|~1~|~01/STR~|~Plan Split for resurfacing of State Route 93 from 6.38 to 11.71 and SR 93A 0.00 to 0.03, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~FA762BDB09B378E4E54E6C4BC95C6845A6F3207A 119897~|~1~|~1~|~01/STR~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~2ECFC870979A0EC172BA5BB41D728C2EF3B4AA77 125571~|~1~|~1~|~01/BRO~|~Plan Split to program project. Updated at Scope Complete.~|~13 - Bridge Rehabilitation~|~70203EF2F96FD21F8A1B2C3919FBEB4D5B0AD376 127270~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~70F7E22D7E85EC1C94B45F9D791C6C6FEEB1DEE8 93701~|~1~|~1~|~01/STR~|~80/20 split between federal and local for the resurfacing of Ravenna Road (CR-601) using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~8CA2EA9D26B6DEF54AF43B1D757DA020DDE0D624 121793~|~1~|~1~|~01/SAF~|~PM on various CR.~|~21 - Safety~|~2BD377568981F8D0E731BCD002C21DC2CDF30238 99228~|~1~|~1~|~01/BRF~|~Replace the superstructure of Bridge No. CLI-CR 2-0.25 (SFN: 1430114) which carries Spring Hill Road over Todd's Fork.~|~13 - Bridge Rehabilitation~|~BF5A77ECF5317D642974A2F6CF8C0478376F6E22 102664~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% Federal and 20% State funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 8802378.~|~13 - Bridge Rehabilitation~|~DA0E5796E785CBDA8D5813F2825A738F8568CBEF 120064~|~1~|~1~|~01/NFA~|~NEVI Round 2 270-B~|~63 - Electric Vehicles & Charging Infrastructure~|~34AC26FFF081919371793EA43613B842FA0D428A 87886~|~1~|~1~|~01/IMS~|~Remove existing slab superstructure on two bridges on IR 70 (BEL-70-0050 L & R, SFN 0701831, 0701866) with a new slab supestructure. The pier caps will be replaced and abutments rehabilitated.~|~13 - Bridge Rehabilitation~|~7BDFDE9243BBFAAE19143B735E57D1D8D3C3AD38 127121~|~1~|~1~|~01/NFA~|~Resurface Trail~|~28 - Facilities for Pedestrians & Bicycles~|~14BA0D1F80C76CE76385A0EBBB49126582DC7233 86209~|~1~|~1~|~01/STR~|~Bridge rehabilitation UNI SR47 7.33 over Bokes Creek~|~13 - Bridge Rehabilitation~|~F80702B6101E4D62CA36F125985B479D90C562E7 86209~|~1~|~2~|~02/STR~|~Replace UNI SR47 9.16 over Lindsey Ditch with box culvert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0555DACD5183F668CEEF2BA88071140E65069B18 86209~|~1~|~3~|~03/STR~|~Replace structure UNI-347-10.37 over Fulton Creek~|~10 - Bridge Replacement~|~0AA5BEEF55876FEB69D6F78917AE113FB0903FE1 96560~|~1~|~2~|~02/S<2~|~POR SR 82 from 13.80 to 17.89.~|~05 - 4R Maintenance - Resurfacing~|~0137BA24F139C0FC3B398D66C6C834EDB3FBBC34 96560~|~1~|~1~|~01/S>2~|~TRU SR 45 from 0.00 to 5.78TRU SR 534 from 3.75 to 4.02 and 5.52 to 5.67.~|~05 - 4R Maintenance - Resurfacing~|~FE90B0ECF2B0C347506769E01C1B515D513DD8B0 96560~|~1~|~3~|~03/STR~|~POR SR 44 from 19.18 to 22.14 and 24.19 to 26.76TRU SR 5 from 30.95 to 32.51TRU SR 5D from 0.00 to 0.07TRU SR 82 from 0.00 to 1.63TRU SR 534 from 5.67 to 7.94~|~05 - 4R Maintenance - Resurfacing~|~4D99654F12C1025A5ACA5BA24BD1E4BD5D4D9B3A 82916~|~1~|~2~|~02/STR~|~Resurfacing on State Route 14 from SLM 17.44 to 18.07, in Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~3406B1AA0E99C80DAAD030F8A7CC816871978625 82916~|~1~|~1~|~01/NHS~|~Paving of State Route 14, from SLM 11.19 to 12.40, 12.90 to 17.44, in Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~EE27CD8282B12DE3E5C2AC9C8290D2E2314D7725 82916~|~1~|~3~|~03/NHS~|~Bridge Rehab of SFN# 6700667, SFN# 6700691, SFN# 6700748, SFN# 6700756, and SFN# 6700810, in Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~F2A2F62E36130849B39B3C6CE6E29A3CA5938367 82916~|~3~|~5~|~05/NHS~|~Hayes Road realignment at State Route 14. Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~F95361ABCCDA132290454831ADC4778B47F6E0C8 82916~|~2~|~4~|~04/NHS~|~Bridge replacement of SFN# 6700780 over Milk Creek, Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~FDD45B32DD8E9F59AE948968BC274F9DA555F917 100600~|~1~|~1~|~01/STR~|~Resurfacing of TUS-93 including asphalt concrete overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~8846082D198BC3FBB202CFC294CE2EC62C2D660F 103713~|~1~|~1~|~01/STR~|~BRO SR 41 3.34 Safety Project.~|~~|~9E59693A9E41CD05DA0BA6B637D0D31631EF85E0 119726~|~1~|~1~|~01/NFA~|~Created Plan Split for TED Involvement~|~~|~1D96055D6D32391B39639ED02029104CEA87730A 93700~|~1~|~1~|~01/IMS~|~01/IMS/PV ; District Preservation 4PF7 (90%) / 4PS7 (10%) - No Cap - Pavement and Joint repair on HAN-IR75 from log 3.22 to log 14.39~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~473A510DC12BE3318F772C0780C8733C60FEC6A9 108968~|~1~|~1~|~01/SAF~|~SRTS Inf. project~|~28 - Facilities for Pedestrians & Bicycles~|~E869776D648443B3C4619E7874D1CA001D09B35B 96334~|~1~|~1~|~01/STR~|~It is proposed to resurface SR41 beginning at the Highland County line SLM 0.00 and terminate at the Ross County line SLM 5.20. This does not include the Ross County section of 0.00 - 0.42 nor the Pike County section of 5.20 - 5.39.~|~05 - 4R Maintenance - Resurfacing~|~DE8DE98D5D6CAA96A395166960F3B9EF4C01C999 97539~|~1~|~1~|~01/BRF~|~Ohio Bridge Partnership Program - Bridge Replacements~|~10 - Bridge Replacement~|~FC4A366D928A3D39443AAD26517190025DE011B3 123915~|~1~|~1~|~01/MPO~|~Resurfacing of SR 73 from Deardoff Road to Commerce Center Drive.~|~05 - 4R Maintenance - Resurfacing~|~F3FBA40B99DD81BA00748BA56A6A42FF9FA572BC 101310~|~1~|~1~|~01/STR~|~Pavement work on FAY SR 207, MAD SR 207, MAD US 62 and MAD US 62D~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D0DC377BD5B896E76B9AFE69D3A3516310A8240 120824~|~1~|~1~|~01/CMQ~|~Plan split for MPO CMAQ eligible scope items~|~21 - Safety~|~C39BFB2E785063E96F1F49F7907A381677850DB6 113092~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~94653148F434C63DA87E9E7F74CB5EC85D7323B1 113092~|~1~|~3~|~03/NHS~|~Minor bridge rehab 10' to 20' span.~|~~|~DC8B86646816B8222DF51F0D80818914CA76C9AD 113092~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~E5EB216AA52584386E44BE0DA8302D8E545609E2 87008~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MOE 7 0.00-2.21, NHS route, Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~A12429072650EDA3EF43A3255D1A443B3BCC6B74 123307~|~1~|~1~|~01/NHS~|~Turn lane improvement/extension at the intersection of SR 16/Licking Valley Road in Licking County.~|~21 - Safety~|~32C70037A1B31FE46B74ABE18369484053442F96 123307~|~1~|~2~|~02/NFA~|~Remove River Road's access to SR 16 EB with the construction of a turnaround.~|~21 - Safety~|~EF0D7151EE2028BDBF8D892A5F95714475FDCB7E 80184~|~1~|~4~|~04/BRO~|~Bridge Work ERI-013-03.67 sfn:2202409~|~13 - Bridge Rehabilitation~|~52EA4B228F94CA9672CF03C4224EB4B5FBB4BDF8 80184~|~1~|~2~|~02/STR~|~District Allocation Resurfacing ERI-013-01.97 - 06.52~|~05 - 4R Maintenance - Resurfacing~|~C1F4B08E4BE34D77E7DD8AF0187C27067931CBCC 80184~|~1~|~3~|~03/S<2~|~District Allocation Resurfacing ERI-013-01.84 - 01.97~|~05 - 4R Maintenance - Resurfacing~|~DCBD40F8F07356144F93CA6D8107233A87C1FD6A 80184~|~1~|~1~|~01/NHS~|~District Allocation - Resurfacing ERI-013-06.52 - 06.92~|~05 - 4R Maintenance - Resurfacing~|~F8740D10DBF78D355FA4374798C763684B158CED 98682~|~1~|~1~|~01/NFA~|~Bridge rehabilitation with correction of roadway approach geometric parameters. CR 196 1.58 SFN 5450861~|~13 - Bridge Rehabilitation~|~41D81029E66E117940E1E426026BB87721113601 116437~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4.~|~21 - Safety~|~A779238AB21BFEE43BAE83988DE41C70A8C8555F 125624~|~1~|~1~|~01/SAF~|~For vertical profile and cross section improvements on Ross Hanover Rd. ~|~21 - Safety~|~8BC73FBD7E58EA0C0B63EA36AEF96C6CFBC06EF2 89032~|~1~|~2~|~02/ENH~|~80/20 fed/local split for all streetscape work using enhancement funds which is capped @ $760,000.~|~04 - Reconstruction - No Added Capacity~|~1770B734CDABDFA9C59F1190A03939C4D223DEB1 89032~|~1~|~1~|~01/MPO~|~80/20 fed/local split for all pavement work using MPO STP funds whichis capped @ $3,504,000.~|~04 - Reconstruction - No Added Capacity~|~47D1D51ED3AD51372B24749657BDFFE34873CF23 89032~|~1~|~3~|~03/NFP~|~100% local participation for items of work not eligible for federal funding and cost above capped funded sources.~|~04 - Reconstruction - No Added Capacity~|~E8FCDBCC6A34572858861565B3C00BE354C353A1 88743~|~1~|~1~|~01/IMS~|~Districtwide Raised Pavement Marker Program.~|~21 - Safety~|~F49E80C7F90DAF9FDCB46946DAA1E2F8A5E3FD1D 97535~|~1~|~1~|~01/NFP~|~Repair of Building C roof at District 4 Arlington headquarters.~|~44 - Other~|~02F50F04C3B018F8D994FEC22D11146A88761907 116699~|~1~|~1~|~01/STR~|~For work on SR697 in Van Wert County in the rural area outside the city of Delphos from SLM 0.00 to 5.50. District Preservation Funds.~|~~|~F387B882B952B526F7D678011D50AD56ED1528C5 116699~|~1~|~2~|~02/S5K~|~For work on SR697 in Van Wert County within the city of Delphos from SLM 5.50 to 6.57. District Preservation Funds.~|~~|~9ADFE0C209D9B6DCBD38233E2F6FD2F3C3DCF745 116864~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE 379 1.74 SFN 5602734.~|~10 - Bridge Replacement~|~6676D66E3EE24EA7DB623EE4B843B9AF7C8CB118 123052~|~1~|~1~|~01/SAF~|~Plan split for sign replacement work~|~21 - Safety~|~F757F438E2C501493A807A415746F4B929A75FD0 92326~|~1~|~1~|~01/NFA~|~Deck replacement on ATH 690 4.74, SFN 0505404. Work includes pile encasement. 100% State.~|~10 - Bridge Replacement~|~B61CAE37F4212B3D8BC45BAF914518C48436780D 126153~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~A6BF93D9AF88BCBB7FB311D3BBE915FB04612143 115708~|~1~|~1~|~01/NFP~|~Loop detector maintenance.~|~~|~46E2D313BAABB5F11E062616C6D42F48BD0B16F7 94191~|~1~|~2~|~02/NHS~|~Plan Split for the NHS portion of US 68. Limits are GRE-68 from SLM 7.71 - 8.75~|~05 - 4R Maintenance - Resurfacing~|~112C014F5CFB1AF69EA3AE2858A0FE5E5CF475D1 94191~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on all lanes on US 68 from I-71 to just before Boyd. CLI US 68: SLm 20.48-23.32 and GRE US 68: SLM 0-5.24~|~05 - 4R Maintenance - Resurfacing~|~4557FB29BD9B2D2DF367C39F550A3431F0E36D0C 94191~|~1~|~3~|~03/IMS~|~All work to resurface the ramps from IR 71 to/from US 68~|~05 - 4R Maintenance - Resurfacing~|~162D22F8EC895FC3310064C511B16438A12E4358 126458~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 2 11.81 (SFN 8439362).~|~10 - Bridge Replacement~|~0DA54CEBEAB32CE6CC4D71DD2C2A5E393832E222 101075~|~1~|~1~|~01/IMS~|~Concrete Pavement Repair on ATB-IR 90-3.70 to 7.58.~|~~|~EC02273B1C192582CE91EE3128139AAC36354C6F 101075~|~1~|~2~|~02/IMS~|~See linked structures >20' span.~|~~|~53F26ABFD1F04F84E2054812548BC54858628447 101759~|~1~|~1~|~01/MPO~|~Mill and fill Main St from McCleary-Jacoby St to Walnut St and Erie St to SR 11, in the City of Cortland, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~7E0F80590BE2F937E27AACB6DDDD0BF7AEBD975F 87000~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay. MOE 255 0.00-18.08. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~9115538B0FDEDC0FAE5236F385AF36FE934B4D51 105590~|~1~|~1~|~01/STR~|~CRA-30 20.76 L&R, MED-IR-0071-19.92 L&R, WAY SR 0302-13.79, RIC-IR-0071-15.28 L&R, WAY SR 0003-11.76 L&R ~|~13 - Bridge Rehabilitation~|~DF1B835C5ADA08A34C9BDD6FB04F2079984CB176 100789~|~1~|~1~|~01/NFP~|~Pavement marking~|~21 - Safety~|~325CD9CE61DE346E21B8AB88E30F174399E9E642 96344~|~1~|~1~|~01/NHS~|~SR-25 from SLM 7.01 to SLM 7.82~|~21 - Safety~|~574957A68C8AD0DFD566CCC1F1ACC2729979CF58 96344~|~1~|~2~|~02/NFA~|~100% City of Toledo funding for requested additions to construction project~|~~|~25289806B346BEE812C3B3791B4BE4EE0A7C6418 107223~|~1~|~1~|~01/MPO~|~MPO funded~|~05 - 4R Maintenance - Resurfacing~|~F32D2CBC073CCA24950ADB91381F0875C7E07458 107223~|~1~|~2~|~02/NHS~|~NHS Urban Paving - 80/20 Fed/City SLM 16.07 to 17.49~|~05 - 4R Maintenance - Resurfacing~|~A042E4201A16CC5AA22ACEECADAD2ACA91DEAE87 107223~|~1~|~3~|~03/NHS~|~100% City of Huron Items SLM 16.07 to 17.49~|~05 - 4R Maintenance - Resurfacing~|~EBCD24990C143CA331805C472DBD1801A6ECE2F5 94880~|~1~|~1~|~01/SAF~|~Continue to update the retro-reflectivity on approximately 90 stop signs, 20 regulatory signs and 10 warning signs on various streets within the City of New Carlisle.~|~~|~48E4D65057ACC6823D122E9D6EC2B0A8D9049BFF 115525~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~23DA4602DFB1CE7166738461E19442026D557088 95929~|~1~|~2~|~02/NHS~|~Replace expansion joints, refurbish bearings, overlay with LMC and patching. Bridge # LOG-33-1596 L SFN 4600843.~|~13 - Bridge Rehabilitation~|~19C240A7616E394557A438CB4C567CB794308E59 95929~|~1~|~1~|~01/NHS~|~Replace expansion joints & abutment bearings, patching and SRS deck on bridge numbers LOG-33-1468 L/R SFNs 4600576 and 4600606 and LOG-33-1533 L/R SFNs 4600789 and 4600819.~|~13 - Bridge Rehabilitation~|~9A2F5CF55AAAAC29D53D2930A9F7ACABE78E4A59 113888~|~1~|~1~|~01/NFA~|~Culvert replacements, ditching and shoulder grading to improve drainage on MOE CR 15, 105, 68 and 88. FLAP funded.~|~04 - Reconstruction - No Added Capacity~|~4D53214BAAEEE0B63732DDC04C33F7481458FC15 110356~|~1~|~1~|~01/SAF~|~PROFILE ADJUSTMENT TO IMPROVE SIGHT DISTANCE AND INTERSECTION RADII~|~21 - Safety~|~9CA6ADEB4AB70ED09888DB71C19F67EBB9E50E90 113803~|~1~|~1~|~01/BRO~|~Replacement of SFN 7033044~|~10 - Bridge Replacement~|~A0B5594779406C43132C9148053E40906F210153 112903~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-37-0.00-6.93~|~05 - 4R Maintenance - Resurfacing~|~87F862E533A656E419AC48DF64EE89A6C96BDF7A 112903~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split: DEL-37-6.93-7.47~|~05 - 4R Maintenance - Resurfacing~|~19F20FA119DE41DE924E239CC78CB4853119377D 91501~|~1~|~1~|~01/STR~|~A FHWA Disaster OH11-02 flood project. DSR: JEF-002: Embankment Failure. Slip in embankment below roadway threatens the road.~|~04 - Reconstruction - No Added Capacity~|~C71108AC80BC2D0C41953D43481A808C5D1CB36D 112815~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~E0389D5EADFDAD1D0DC62144D2B22DB112F67A85 91844~|~1~|~1~|~01/STR~|~Asphalt resurfacing on HAS-250 and Fine Graded Polymer Asphalt resurfacing on HAS-9~|~05 - 4R Maintenance - Resurfacing~|~51035D97F324A1FA846D6CFAD640B8262B015121 95338~|~1~|~1~|~01/SAE~|~Guardrail replacement and upgrade on various county roads.~|~21 - Safety~|~AEC401A7AE73109FD77D08B5312F5B30EAFC79B1 83041~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation funding - No CAP's - Crack sealing - Cos-SR 16-00.00 to 08.93~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~44E88F61219CCD36A2BA1F7D3215A3EE95B16580 83041~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No Cap's - Crack sealing - Cos-SR 541-31.87 to 34.62; Cos-SR 79-00.00 to 12.37; Cos-SR 83-00.00 to 09.02; Gue-SR 146-00.00 to 09.86; Kno-US 36-00.00 to 14.98; Gue-SR 541-00.00 to 08.89; Gue-US 22-14.66 to 31.04; Gue-US 22-00.00 to 04.08; Kno-SR 3-20.61 to 34.71~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~78AFAB832DD596EA68FE7C0456B54B2A52E12437 83041~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation Funding - No CAP's- Crack sealing - Kno-US 36-14.98 to 16.53; Gue-US 22 04.08 to 06.00; Kno-SR 3-18.95 to 20.61~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE3119F4E4BFFDC5A4EF5276DFC69EEBCA15AAB1 107900~|~1~|~1~|~01/IMS~|~OH18-01 ER Event. Landslide repair project. WAS 77 16.61, DSR WAS-007. Interstate route funded 100% federal ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7F8A079FD42841B2EA0B1E281F311CCC87EC8A94 104626~|~1~|~1~|~01/MPO~|~Resurfacing Mecca Street in the City of Cortland.~|~05 - 4R Maintenance - Resurfacing~|~188600CEDA2FC86AC4691A94817F31C70A50BAEA 120007~|~1~|~1~|~01/NFA~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~94665D72D712F754ACFC0C72A0351DF7974374F3 117500~|~1~|~1~|~01/BRF/CCEO~|~Replacement of the existing superstructure.~|~13 - Bridge Rehabilitation~|~C49B6CF310CF0F0B8D35A79F4D22D9BAAAE33DF7 110587~|~1~|~1~|~01/SAF~|~Improvements at the intersection of FRA SR 3 (Cleveland Ave) and Hudson St~|~21 - Safety~|~06F2A846ADBAC11CF153BCE39C9508D9938E721A 112833~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~9A44E106E074A060A10DAA34FC9CA94FEF1B3DD2 112833~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~7C2F7426606B176AE287BE158286E5716D68E4FF 112833~|~1~|~4~|~04/STR~|~Minor bridge rehab 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~8229872333445B3648B3D945095A3C56086F7CFF 112833~|~1~|~1~|~01/STR~|~Resurfacing, includes major rehab funds.~|~05 - 4R Maintenance - Resurfacing~|~072BEFD4CC7D9E94BEF5013288E3177146949AC8 113260~|~1~|~1~|~01/MPO~|~Split for MPO fund federal-aid eligible work.~|~05 - 4R Maintenance - Resurfacing~|~77114926C27D719E2622994EB62D45E6D5F829D8 113260~|~1~|~2~|~02/SAF~|~Split for safety funded traffic control items~|~21 - Safety~|~C37471418C6761C8C60BAD2065E6C3619E7439EB 113260~|~1~|~3~|~03/NFP~|~Plan split for installation of turn lane and non-eligible work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~E8DB8E7886140CE5230B6802DEFA8526C9EB2DA1 93835~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: On SR138, located 1.12 miles west of SR753. Project Description: It is proposed to replace the structure, SFN 3603393. 80/20 Split01/STR/BR/State~|~10 - Bridge Replacement~|~B930DD741B4EA49BC750372BF8ADFBB64AA09556 101199~|~1~|~1~|~01/SAE~|~Complete various coutermeasures including replacing curb ramps, installing countdown pedestrian signal heads, improving school zone signage, installing speed humps, and installing warning signs to improve safety of students walking and biking to school.~|~28 - Facilities for Pedestrians & Bicycles~|~8F8A39E9E97EC417E813328234D63B59AD61425C 101199~|~1~|~2~|~02/SAE~|~PID 103746 - Complete carious countermeasures including replacing curb ramps, installing countdown pedestrian signal heads, improving school zone signage, installing speed humps and installing warning signs to improve safety of students walking and biking to school.~|~28 - Facilities for Pedestrians & Bicycles~|~90BED99F25BBB34EB113FE4A737E51BE67646DB3 93961~|~1~|~1~|~01/S>2~|~Urban Paving eligible items between SLM 11.66 to 13.28~|~05 - 4R Maintenance - Resurfacing~|~4EBBA63D116E03ED26E2F6545256E8DB52BF7E37 93961~|~1~|~2~|~02/NFP~|~Urban Paving Ineligible items.~|~05 - 4R Maintenance - Resurfacing~|~EA9CDACE7E3788B09F49D07FC61FD6925A79E16A 25516~|~1~|~1~|~01/STR~|~3502945 HEN SR109 9.88 Intersect: South Turkeyfoot Creek~|~10 - Bridge Replacement~|~7B1C9B72029C17AF678460F92D37D5A3DBE1C457 82553~|~1~|~1~|~01/MPO~|~This project will provide a new network connection from Mt. Carmel-Tabasco Road on Old State Route 74 approximately 7000 feet to Eastgate Boulevard. Project right-of-way width will address highway, rail transit, and pedestrian facilities consistent with the Eastern Corridor Record of Decision related to TSM actions and preservation of the Wasson Rail Transit Corridor. Addition of curb and gutter storm drainage, paved shoulders, and street lighting and landscaping will be provided where applicable. CCTID will provide travel demand modeling and certified traffic through existing TDM Task Order. The project will include the addition of curb and gutter storm drainage, paved shoulders, street lighting, ladscaped medians where applicable. Project will require right-of-way widths varying from 60 to 90 feet and is a critical maintenance of traffic element for the I-275/S32 Interchange project. Clermont County TID~|~01 - New Construction~|~49FB2811E665CDAE09EE0E851B5D2B5056AD9BCE 82553~|~1~|~2~|~02/ENH~|~Plan split for the following Transportation Altnernatives Program eligible items: portion of embankment associated with sidewalk construction, new sidewalks, lighting, and retaining walls required for sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~DFC7E1476286F25CB4EDBFFF37CE6452756C172E 93710~|~1~|~2~|~02/IMS~|~Culvert Repair RIC-071-18.90~|~44 - Other~|~97CBD11898560A382132CB9EE4B5A09FB76EC9B1 93710~|~1~|~1~|~01/NHS~|~Culvert Repairs RIC-030-05.20 / RIC-030-06.60 / RIC-030-17.34~|~44 - Other~|~C35335FCC30D0E24C4A94B13E5C4635F3BD32E2C 88632~|~1~|~1~|~01/STR~|~Two lane resurfacing of SR-656 from DEL County line to SR-229~|~05 - 4R Maintenance - Resurfacing~|~0E39D9ADB7C08DC28E71F91C53BC1A4829B2F5E2 94561~|~1~|~1~|~01/BRF~|~SFN 2531453. FRA-CR20 (Smothers Road) over Hoover Reservoir.~|~13 - Bridge Rehabilitation~|~79FD066602F74DBD78652A454D52D34B0F041905 113113~|~1~|~1~|~01/NFP~|~2026 Operations Chip Seals~|~05 - 4R Maintenance - Resurfacing~|~05E61C2795275C6D61586AEDEB7C8516B9DDA58E 90988~|~1~|~1~|~01/SAE~|~A safe routes to school funded project to repair/construct sidewalks in the Village of Put-in-Bay OTT CR215 0.4-0.41~|~21 - Safety~|~009677A062399972C264800817B5A7EF2558221F 104289~|~1~|~1~|~01/NHS~|~Pruning, Tree/Bush removal~|~44 - Other~|~B601931E1D0973A7DBC88634BF11C12299435C20 123070~|~1~|~1~|~01/BRF~|~Bridge replacement. ~|~10 - Bridge Replacement~|~1BE1302B6E59D663ADB74D9324B174CF9A4F2AB2 116411~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~9C6B9A81A3C0FF3A3252C3B36B620D7CBBE5DF2D 124323~|~1~|~1~|~01/STR~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~01BBF071E7A29282C122087D9F910EB596A690C9 122975~|~1~|~1~|~01/BRO~|~Plan Split for Municipal Bridge funded scope.~|~13 - Bridge Rehabilitation~|~0B8DBA89C64B720A12D66482B38B7B0DA0461759 109571~|~1~|~1~|~01/IMS~|~Interchange lighting at various locations: WAR-IR 71/SR 741 WAR-IR 71/Wilmington HAM-IR 275/RR Hwy~|~21 - Safety~|~3320CF8BFE169969863746F18DBDAD6E09B2E419 109571~|~1~|~2~|~02/NHS~|~Interchange lighting at various locations: GRE-US 35/US 35B~|~21 - Safety~|~CC4DBB124D2ED872BE7BFB5762E91AAF426F59A8 116826~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~A08B3F41F635DB151F4E288E52A1C8496998D78F 116826~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~1DBA0F3D7D96E89EDF5C6403508D678F10022AAF 117525~|~1~|~1~|~01/IMS~|~Plan Split to reconstruction the existing pavement on HAM-75~|~04 - Reconstruction - No Added Capacity~|~CDF33D749893DE8E057F0495C235DDF5DFEB4042 117525~|~1~|~2~|~02/IMS~|~Pavement - added capacity for the new 4th lane in each direction. This split also includes four alternate bid items for MSD work. These drainage alternates are for 69th Street (STA 481), Seymour (STA 492), Woodland (STA 525), and Summit.~|~03 - Reconstruction - Added Capacity~|~CC125BFC4C3A4A022FDD6C63D3CBF4F54DF97BBE 117525~|~1~|~3~|~03/IMS~|~Bridge plan split to reconstruct the bridge for the additional 4th lane~|~10 - Bridge Replacement~|~CF2016A8E2641AF086BB4BF54560BDDB004ED8B2 99535~|~1~|~1~|~01/IMS~|~Resurfacing work funded at 90/10 fed/state.~|~05 - 4R Maintenance - Resurfacing~|~6C522357E090A50831C008DDD964C3EF48ADEF0C 105739~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items~|~05 - 4R Maintenance - Resurfacing~|~9957DFB39B5796A8DC2B16659384C70A05F58DE2 108675~|~1~|~1~|~01/STR~|~ER Event OH18-01. Landslide repair project. WAS 550 14.30. DSR WAS-017. Rural other federal aid funded 100% federal ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A5068532434031D37C6129A8C3A94CC829BFEC03 92880~|~1~|~1~|~01/S>2~|~Urban paving - 80/20 - District Allocation/City of Avon~|~05 - 4R Maintenance - Resurfacing~|~2D63864734E0C6CD0D660A36F75C68D6104C1CE9 92880~|~1~|~2~|~02/S>2~|~Urban paving - 80/20 - District Allocation/City of Avon Lake~|~05 - 4R Maintenance - Resurfacing~|~C953087217E5B49C4AA38CB267FB1AD514056147 92880~|~1~|~3~|~03/S>2~|~City of Avon 100% Local items.~|~05 - 4R Maintenance - Resurfacing~|~60F27E17B8656D0A0618F7D3EA708BE5FFC39AE7 126679~|~1~|~1~|~01/NFP~|~Plan split for construction engineering~|~17 - Construction Engineering~|~108B540E0354EC8E499BD767F3FA7A643D03AD59 81360~|~1~|~3~|~03/BRO~|~Work on FRA-270-27.92 SFN 2511584 BR eligible~|~13 - Bridge Rehabilitation~|~5A2ED6D2591F48AC6DF96A853FC6268381EB90B8 81360~|~1~|~1~|~01/IMS~|~Minor pavement rehab on FRA-270: 26.49-29.38 and guardrail work01/IMS/PV/~|~05 - 4R Maintenance - Resurfacing~|~AD185E8A95DCD34FAAB1E7FFA4EC58C36E9DE2EC 81360~|~1~|~2~|~02/IMS~|~Minor bridge work (patching & sealing - non BR eligible) for 6 bridges:2511657 FRA IR270 28.01 Intersect: Over Alum Creek2511673 FRA IR270 28.55 Intersect: Cd Road O Abandonded Rr2511703 FRA IR270 28.55 Intersect: Cd Road O Abandoned Rr2511770 FRA IR270 28.55 Intersect: Over Abandoned Rr2511797 FRA IR270 28.71 Intersect: Rt Cd Road Over Sr 32511878 FRA IR270 28.71 Intersect: Over St Rt 302/IMS/BR/~|~13 - Bridge Rehabilitation~|~C68489583C6184018B7D25756AC2CBD2EF39FC78 96098~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - District Preservation Bridge Funding 4PS7(100% State) - No CAP - Repaire of 3001237 GUE IR 70 09.43 Intersect: Wills Creek & CR 35; Not BR Eligible for Replacement: Length=293 SD/FO(2) SR=85.0 DSR=6~|~13 - Bridge Rehabilitation~|~9DEB441F9D208301B5DD17505E66254F40A0D3EC 96098~|~1~|~2~|~02/NFP~|~"02/NFP/BR/ " - District Preservation Bridge Funding 4PS7(100% State) - No CAP - Repair of strike detection equipment and 3001202 GUE IR 70 09.43A Intersect: Wills Creek & CR 35; Not BR Eligible for Replacement: Length=304 SD/FO(2) SR=87.6 DSR=7~|~13 - Bridge Rehabilitation~|~D99128B6441DFE194BA155682CD42EDEFC77A94D 100301~|~1~|~1~|~01/NFA~|~Provide a network of bicycle stations in the Downtown Cleveland and University Circle.~|~44 - Other~|~FD57EF7D9F8FE774058F407F402E54C000C3BDC9 121152~|~1~|~1~|~01/BRO/STCE~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~0578A0F134877AEE06F61301345AB626D88B3BED 96381~|~1~|~1~|~01/SAF~|~Improvements on the N side of Canal Street (SR47) from the existing sidewalk on school property to the midblock crosswalk for the nearby mobile home park where Rectangluar Rapid Flashing Beacons (RRFBs) will be installed.~|~21 - Safety~|~E0D00E52BDA75138B316A666526B1A1CC8C2E955 106761~|~1~|~1~|~01/IMS~|~Drainage modification to prevent flooding on IR-480~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D208576CFA5D0BD76D63CDCCFC5C83D7C524F8E7 89019~|~2~|~2~|~02/NFP~|~District Preservation 4PS7 (100% State) - No CAP - Rehabilitation on 3006638 GUE SR662 2.4 Intersect: Over Indian Camp Run; Not BR Eligible for Rehabilitation: Length=73 SD/FO(0) SR=84.0 DSR=6~|~13 - Bridge Rehabilitation~|~08DE81C5D5E8149373C532B27FCC396442D4070A 89019~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3003876 GUE SR146 9.81 Intersect: Buffalo Fork; Not BR Eligible for Rehabilitation: Length=116 SD/FO(0) SR=98.1 DSR=7~|~13 - Bridge Rehabilitation~|~38BE645BC0480F46AE42284455F31BE307A87E9C 109758~|~1~|~1~|~01/STR~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~8DCCC5F7931E940EC0D8EB424BBA4E63491F7BE6 109758~|~1~|~2~|~02/S<2~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~8032C53BA01E8F48F35E4C73C99D94D8A3CFBEB1 109758~|~1~|~3~|~03/NFA~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~2464242D1E463DBDFC1FD14C988F8609148DAF79 109758~|~1~|~4~|~04/NFP~|~Adding state ER.~|~05 - 4R Maintenance - Resurfacing~|~6621EDD285683935FDFE9FF4681605B9FFA7023F 113074~|~1~|~1~|~01/NHS~|~Perform concrete pavement repairs~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3C0D7DEA348311C138E18C5A824433CDA7F27196 113074~|~1~|~2~|~02/NHS~|~Patching concrete structure, removal of existing coatings, and sealing of concrete surfaces~|~47 - Bridge Preventive Maintenance~|~A1216367E39096C457D341C91AB6B14875BB7C82 95563~|~1~|~1~|~01/NHS~|~HIG US 50 (12.27-12.69/14.61-14.65/14.81-14.98)80% Fed / 20% State~|~05 - 4R Maintenance - Resurfacing~|~BCC9847DFAD856F850B274A8DD1F1366BF4F6D18 95563~|~1~|~2~|~02/NHS~|~HIG US 50 (12.69-14.61/14.65-14.81)80% Fed/20% Local match by City of Hillsboro~|~05 - 4R Maintenance - Resurfacing~|~5A4653BF9F0465D6BE46E7AB3ECC1DD65F40EEDF 101619~|~1~|~1~|~01/ENH~|~Work funded with federal funds through the Transportation Alternatives Program. 95% federal funds using Toll Revenue Credit (TRC) with the 5% match provided by Putnam County. Funds needed over the capped amount will be provided by Putnam County.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~FCD0D813CED9D58ED7CFA6D141248F3BD050E635 115275~|~1~|~1~|~01/IMS~|~Plan split for pavement major rehab~|~04 - Reconstruction - No Added Capacity~|~87E9E7058CCC6B2346ABB67688ECFCFAD2A0E361 84744~|~1~|~1~|~01/STR~|~Resurfacing~|~44 - Other~|~FF0CB28B2BDBE89FB108416A78C236EF77E28D17 122836~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~B7E29A167A88B1663A90BE6B6606C420E08783CD 120306~|~1~|~1~|~01/NFA/YOUN~|~Remove bridge.~|~40 - Special Bridge~|~478DCC7FE112D8B8DF77042C6B6B1B5363721BC1 97426~|~1~|~1~|~01/SAE~|~Installation of new and reconstruction of existing guardrail on various County roads.~|~21 - Safety~|~09357F4AC897B6E7FC3CB00C477D5458D2B1933C 122812~|~1~|~1~|~01/ERD~|~Minor realignment of the Valley Road intersection with Dumford Road. Addition of a west leg to the intersection and construction of phase 1 of the new roadway connecting Valley Road to Indian Ripple Road.~|~01 - New Construction~|~ADCA033CF425225582B5BFC1B598F3E0D4DBEEC1 98770~|~1~|~1~|~01/NFA~|~Plane and resurface the Armstrong Museum parking lot.~|~44 - Other~|~443CD5EEA097D81E9A8805E1A6C4C56CEE09D5E4 106238~|~1~|~1~|~01/NHS~|~Culvert repairs to 0249, 0278, 0632, 0703 and 0712 under US 50, Hamilton County.~|~~|~142FDD2D8E0CE8676CA5211542044A1816DA31CC 106200~|~1~|~1~|~01/NFP~|~D04 FY 2023 culvert repair/replacements.~|~04 - Reconstruction - No Added Capacity~|~D281C80554F8D99403DA6366AA443AB26E74BFF6 106200~|~1~|~2~|~02/NFP~|~Catch basin repair.~|~04 - Reconstruction - No Added Capacity~|~1675F4654FA1D63EF4DA887CD9357650BCC5EED0 95679~|~1~|~1~|~01/MPO~|~Boyer/Schoonmaker Vessel.~|~44 - Other~|~A24F988712DACD5F93DA9F69C290A824D748E0C3 99067~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control - 2 lane highway - DAR/MER/SHE/MIA~|~44 - Other~|~1FFC8AA18492CD792C0302F6A3E7435E851C4BA3 97369~|~1~|~1~|~01/SAF~|~Installation and replacement of guardrail on various county roads in Greene County.~|~21 - Safety~|~27993C58280D2350D8622B0DFC477A275F9CFEE1 103652~|~1~|~1~|~01/IMS~|~Install median/cable barrier along MAH IR 680 from 2.06 to 3.86.~|~~|~21DCC8248FD32C2275CF51F9CBF65B0FEA385EA8 117942~|~1~|~1~|~01/NFP~|~Installing recessed wet reflective pavement markings on various routes throughout District 4.~|~~|~8CB5ABA25305EDDB0BFB0BF6DE4CCB38CAF8E0AB 92365~|~1~|~2~|~02/STR~|~3 bridges~|~05 - 4R Maintenance - Resurfacing~|~A88114AA0DC5191081EF6A9CAEA3E49976E31ECA 92365~|~1~|~1~|~01/STR~|~resurface LUC SR 295 19.54-21.45 - Berkey Corp Line to Michigan State Line~|~17 - Construction Engineering~|~EA31FDE4E0D3ED90545184A251A885F00B0F59D6 110031~|~1~|~1~|~01/SAE~|~Resurface US-22 and restripe to 5 lanes between Old Mille Rd and Creekwoods Place/Old 3C Highway.~|~~|~47F5358AD06478DC2BBD9AC749BC58B203ACA2EF 100939~|~1~|~2~|~02/NHS~|~Resurfacing of STA US 62 from 0.86 to 0.93 and STA SR 21 from 0.00 to 5.47.~|~05 - 4R Maintenance - Resurfacing~|~7649F15FA8EA7C8C1C9DBE9E3AF9CC4403D06707 100939~|~1~|~1~|~01/IMS~|~Resurfacing of STA IR 77 from 12.80 to 17.62.~|~05 - 4R Maintenance - Resurfacing~|~ADBF7D5E95C594D4105F8C1210F5F0DA81E639E5 100939~|~1~|~3~|~03/STR~|~Resurfacing of STA US 62 from 0.00 to 0.86 and STA SR 619 from 7.36 to 14.74.~|~05 - 4R Maintenance - Resurfacing~|~BE90718FD7543351ED9178CE243BCD51CF247B47 126333~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~6D7B6E7AE93D4E88D0DB970062875D69590F29CD 99725~|~1~|~1~|~01/NHS~|~Resurfacing of Canton Road from Salmon Drive to approximately 500' south of Springfield Lake Drive.~|~05 - 4R Maintenance - Resurfacing~|~882A1CB4785CC90A2B2D54BF86E27974EFD9C4CD 92419~|~1~|~1~|~01/NFA~|~Grading and resurfacing existing parking lots and drives at Eastwood metro park.~|~05 - 4R Maintenance - Resurfacing~|~A89A8121022C181E751F0E5DB40EEC78B1FC51B7 119964~|~1~|~1~|~01/CMQ~|~Widen Shakertown Road from Carthage Drive to Southern Belle Blvd. including curb, gutter and installation of sidewalk.~|~03 - Reconstruction - Added Capacity~|~DC101759AE95600558CA6E6C7D84AB7951B9661B 114006~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items using SAC 4HJ7~|~21 - Safety~|~1FE93B04223EF23E5EC0297EFE800326B0B9F6C4 104699~|~1~|~1~|~01/NFA~|~Replace traffic &/or CS building at D7 HQ.~|~44 - Other~|~FD188A756B77E87C20EEF6D98B000FAE29CF403F 88331~|~1~|~1~|~01/S<2~|~Safe Routes to School program. Various location thoughout the Coty of Mansfield~|~28 - Facilities for Pedestrians & Bicycles~|~EFB226B3C90C8189954A3E51238D240B43BAAE52 97837~|~1~|~1~|~01/SAF~|~SRTS funding for ped crossing~|~21 - Safety~|~27889B4C32383DCDF4954CEB0E99B983FA40D2A7 105285~|~1~|~1~|~01/STR~|~Resurfacing of HOL-62~|~05 - 4R Maintenance - Resurfacing~|~BE44B9E7305A5630F086B75651FAEEDE3EC9FE98 102002~|~1~|~1~|~01/NFP~|~District 4 one year mowing contract along interstate and interstate look-a-likes in Portage, Stark and Summit Counties.~|~~|~9D70215C1060905768058D0CBCE1B14FC1A4714B 87076~|~1~|~1~|~01/NHS~|~Priority System - Minor Rehab. on BEL-7-23.45 to 26.44 and JEF-7-0.00 to 0.16; includes asphalt resurfacing to address any structural deficiencies, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~8A7491E6390AB6A8AE994529EDAC65C681AD7BF7 94450~|~1~|~1~|~01/BRF~|~"01/BRF/BR/LCEO" - CEAO LBR Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP of $405,600.00 LBR funding @ 80% plus $76,050.00 Credit Bridge Program credit @ 15% - Replacement of 4540018 LIC CR315 1.35 Intersect: Claylick Crk; BR Eligible for Replacement: Length=34 SD/FO(1) SR=37.0 DSR=" "~|~10 - Bridge Replacement~|~6B013B254060613E8377CE3E833D47DAAF6B4EAB 85135~|~1~|~1~|~01/S>2~|~Minor pavement rehab on US 50 in Clermont County from eastern Milford corp to the Village of Marathon. This split for the Urban portion of the pavement between SLM 2.21 to 5.13 and between SLM 10.76 to 11.54.~|~05 - 4R Maintenance - Resurfacing~|~02374429E0D1A4156ADA9C059A39F9FB06DF5FAB 85135~|~1~|~3~|~03/S>2~|~Project includes minor bridge work to structures CLE-50-0225 (sfn 1300830), CLE-50-0381 (sfn 1300857), CLE-50-0451 (sfn 1300911), and CLE-50-1133 (sfn 1301063).~|~13 - Bridge Rehabilitation~|~5FAC67BF1FF30CB15035A8EA30D749D4619542FF 85135~|~1~|~2~|~02/STR~|~Minor pavement rehab on US 50 in Clermont County from eastern Milford corp to the Village of Marathon. This split for the Rural portion of the pavement between SLM 5.13 to 7.75 and between SLM 8.75 to 10.76 and between SLM 11.54 to 18.08.~|~05 - 4R Maintenance - Resurfacing~|~ACF90FEAEBE2B4FB05329B6344A175AA09D09F6D 85135~|~1~|~4~|~04/STR~|~Project includes minor bridge work for structures CLE-50-0546 (sfn 1300946), CLE-50-0584 (sfn 1300954), CLE-50-0678 (sfn 1301004), CLE-50-0745 (sfn 1301039), CLE-50-1264 (sfn 1301144), CLE-50-1499 (sfn 1301187), CLE-50-1589 (sfn 1301217) and CLE-50-1760 (sfn 1301233).~|~13 - Bridge Rehabilitation~|~BF3A6F659C1528DF5D77276911A352AAB43F92D5 92502~|~1~|~1~|~01/MPO~|~Replace and widen Eastgate Blvd bridge and widen approaches to bridge to accommodate new ramps to/from SR32. Include improvements to Eastgate North Frontage Road to accommodate ramp connection for SR32 westbound. Include ramp construction for west SR32. East SR32 ramp connection will be included in a future project.~|~21 - Safety~|~1D239795908DC2E94B64D5F872ACCC721201CFBC 92502~|~1~|~2~|~02/BRF/CLE~|~Replace bridge SFN 1300202~|~03 - Reconstruction - Added Capacity~|~2FFC1FC4C6D347DB9AFF553EABACDB1F4812E137 126318~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~~|~825FEB9780AC9F592724135638DBBF40E84D35F2 102838~|~1~|~1~|~01/MPO~|~Intersection Improvement.~|~~|~385E3F9786F48CD9F696597C4F48ECB6838A2498 117340~|~1~|~1~|~01/BRF~|~Bridge replacement. All work in this plan split. ~|~10 - Bridge Replacement~|~A1E67184B7942A83047CE7508F73F35B777DCEE2 102873~|~1~|~1~|~01/IMS~|~Plan Split 01 created for interstate routes~|~05 - 4R Maintenance - Resurfacing~|~4D3B08625CB435A2210A6283171EB62913E45D85 102873~|~1~|~2~|~02/NHS~|~Plan Split 02 created for NHS routes~|~05 - 4R Maintenance - Resurfacing~|~A304B9CC9A9F44057D5B85651BDDC5CBEC671D3A 102873~|~1~|~3~|~03/STR~|~Plan Split 03 created for STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~2EC27A5BCD7A74C4697AB66D15C31871794BAAE6 102873~|~1~|~4~|~04/S>2~|~Plan Split 04 created for STP > 200000 routes~|~05 - 4R Maintenance - Resurfacing~|~AB7F207E8CC3244A5D436AF4AD41B887BBBCB2ED 101205~|~1~|~1~|~01/IMS~|~Pavement plan split 1 created for all Interstate Routes: FRA-71-17.65-18.50/19.09-25.62~|~05 - 4R Maintenance - Resurfacing~|~7DBB8D73BDDD8212F746CE4F3FA1BAFABB19F53B 101205~|~1~|~2~|~02/IMS~|~CO CO Engr 01 pavement plan split 1 created for the follwing interstate routes: FRA-71-17.65-18.50/19.09-25.62~|~17 - Construction Engineering~|~698E04D92ADE9DDC71DA919BDEC681D2D5DCF980 98801~|~1~|~1~|~01/MPO~|~80/20 federal split with local match for eligible resurfacing work items.~|~05 - 4R Maintenance - Resurfacing~|~C22492DD0D7FEFB4DCC1F1A10EFB308E69322B48 116810~|~1~|~1~|~01/S>2/AURO~|~Resurfacing, urban paving in the city of Aurora.~|~05 - 4R Maintenance - Resurfacing~|~E568223A7F7549E07AF8C854592DE4A1CAFF9DE9 119596~|~1~|~1~|~01/NFP~|~Misc. Laboratory Testing~|~17 - Construction Engineering~|~55C1BB546D7E1E06A259395C664222E135EF628C 108722~|~1~|~1~|~01/STR~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-031~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1CE1A464BA203D46DA81CF82504B782E744AF7E5 108722~|~1~|~2~|~02/STR~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-032~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~464B30A766E7E455957208EA252EC9DE8CA1D16B 90589~|~1~|~1~|~01/SAF~|~Guardrail replacement project using CEAO funds. 100% Federal.~|~21 - Safety~|~3D81CAADFE13485F6B6AAA5A8F57C59D0B1ADBD5 115102~|~1~|~1~|~01/S<2~|~Rock fall maintenance.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E796CD68BE9B7B6A8C2D4B5BE6749AA7C3D67260 94353~|~1~|~1~|~01/NFP~|~ODNR funded project. Lake Hope State Park - Asphalt repairs/resurfacing; Zaleski State Forest - Culvert replacements and asphalt resurfacing; Waterloo Wildlife Area - Asphalt/aggregate resurfacing and guardrail. 100% state funded.~|~44 - Other~|~14B10B76536DA7F0AA9496FDA7C22966E2B91239 122389~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work for the repair and resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~808991F00278DCEF5BED1837E3B5B330EE2E4B1C 122389~|~1~|~1~|~01/MPO~|~Plan split for STBG TLCI & STBG set-aside Transportation Alternatives funding eligible work for pedestrian improvements and signal/crossing upgrades.~|~28 - Facilities for Pedestrians & Bicycles~|~92943C5A9108EC45BA5C6B82D500F63AAE3F8620 93509~|~1~|~1~|~01/S>2~|~Project involves the installation of a traffic signal at Main Street (BUS-35) and Hospitality Drive to permit all turning movements. In addition, a stop controlled "T" intersection will be constructed at the US-35 Bypass ramp with Main Street.~|~21 - Safety~|~044ECD4BACD2B28DB6CB7FA7D363074822A50CB1 101098~|~1~|~1~|~01/NHS~|~Replace superstructure on bridge COL-30-3407 (SFN 1502344). Project will also repair the substructure units and convert the abutments to semi-integral type. Vandal protection fencing will be maintained on the bridge. Project will also construct an access road to the inlet debris rack for structure COL-7-0595 (SFN 1500090).~|~13 - Bridge Rehabilitation~|~D972CCAFBD6BE7F1ECADE9FD2A35CFD4B4B61F52 118752~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~17C64065E4F3B54FCE5EFD47846BE3BB33696C47 115768~|~1~|~1~|~01/S>2~|~Sancus Blvd Upgrade~|~04 - Reconstruction - No Added Capacity~|~FA5E684D234EDC27B9905811F91598025BB4B332 116840~|~1~|~1~|~01/NHS/MTVN~|~Construction costs associated with NHS segments~|~07 - 4R Maintenance - Relocation~|~2F12AA2A5A4755EE5E43EFA29355148C1CE6A206 116840~|~1~|~2~|~02/S5K/MTVN~|~Construction costs along other federal aid highway routes~|~07 - 4R Maintenance - Relocation~|~A8C45BF3E7A7F70F8AED491156D695BF51FF5944 116943~|~1~|~1~|~01/STR~|~AC Overlay w/ Repairs HUR-303-0.00 to 3.72~|~05 - 4R Maintenance - Resurfacing~|~F3B0078B75E55632D40B08C858EACDA19FA4D852 116943~|~1~|~2~|~02/STR~|~Bridge Rehabilitation on SFN 3904083 HUR-303-1.93~|~13 - Bridge Rehabilitation~|~63213F091DAFD04CAE1EAEA10D87C69718FDB53D 83078~|~1~|~2~|~02/SAF~|~waterworks relocation to accommodate roadway work along East Miami River road as part of the ramp improvment project.~|~21 - Safety~|~4EDC9B4F8946A1802EBF287AC4421D46429D245B 83078~|~1~|~1~|~01/SAE~|~On HAM-27 at 4.32 miles north of IR-275: add connection, from US-27 to East Miami River Road, on west side of US-27 that is similar to the connection on the east side. ~|~21 - Safety~|~87C013BDD54A37DD440F7EB32024CC986920508A 97652~|~1~|~1~|~01/NFP~|~City of Independence will finance the construction of this interchange modification access as well as the improvement along Rockside Road to improve traffic flow in this area.~|~~|~30F0D755E4255DC8AB56F638F5419E0906A02748 103589~|~1~|~1~|~01/NFA~|~Bridge Replacement. All work is in this split. 100% state funds from the District Preservation Program budget SAC 4PS7. Work on a minor collector that that is not on the federal aid system. The bridge at 0.10 meets the state definition of a bridge but not the federal definition.~|~10 - Bridge Replacement~|~13375C3B06EC290B30E4E8FF0FF0C7686D5729BB 117639~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~A12C41FC781758AB8AEBE83E2AD8A8A9EBF43188 124067~|~1~|~1~|~01/NFA/FAI~|~Replacement of the existing structure (SFN 2334194) on Basil Rd in Fairfield County.~|~10 - Bridge Replacement~|~57A60E58EF4057168C61F286F53B62495981C677 97377~|~1~|~1~|~01/STR~|~Prevailing wage Tree cutting contract~|~44 - Other~|~5D40952FAB29B77179E667785652C77BE3C50501 97377~|~2~|~2~|~02/STR~|~Bat Tree Removal along US 20 Corridor for PID 82632- 100%-4BD7 Funds~|~~|~F651E63F6DBB73F2C8228868D7AD902500157F20 97377~|~2~|~3~|~03/NHS~|~Removal of Bat Trees along US 20 Corridor for PID 82632 4BD7 Funds.~|~44 - Other~|~2FF88BFE332DA91E09030CD249563C9097EEA420 101213~|~1~|~1~|~01/NFA~|~Non-federal aid eligible lane miles on SR 64 slm 10.85-11.37.~|~05 - 4R Maintenance - Resurfacing~|~B796691B22640347738501FA0516FF850C0CEB7D 101213~|~1~|~2~|~02/STR~|~Resurfacing FUL 64 and SR 120 on STP Rural eligible portion.~|~05 - 4R Maintenance - Resurfacing~|~A4D0101BA85DEAEDC154F7CBC18D537BCE6BDA8E 101213~|~1~|~3~|~03/NFP~|~100% Village of Metamora funded items - Curb~|~05 - 4R Maintenance - Resurfacing~|~102D61A3E47601EC083DF9766D90B72EC9444947 124375~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation of federally eligible bridges on the interstate system.~|~13 - Bridge Rehabilitation~|~21913CEB6835641AB7956AB8BBA3F54FD1BCC25E 96001~|~1~|~1~|~01/STR~|~District Preservation Bridge Funds - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on SFN 16000214 COS USR 36 05.88~|~10 - Bridge Replacement~|~AB7015A8C21EAECED253CAEEBA9971C93A3C8CD5 115834~|~1~|~1~|~01/NFP~|~Pavement ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EF021123CE1AB634DA034AF6613D9D09C5405285 105173~|~1~|~1~|~01/STR~|~Microsurfacing on rural route: SHE SR 274 SLM 10.73 to 15.24.~|~05 - 4R Maintenance - Resurfacing~|~048A90476510347CA5A3222CD73784653426B405 99499~|~1~|~1~|~01/SAE/Knox~|~"01/SAE/OT/KNOX" - Knox County Engineer approved CEAO funded project for the guardrail on various Cty Rds approved for max of $300,000.~|~21 - Safety~|~874CBDD1298F54F05CE1DE738173208102A820DA 111991~|~1~|~1~|~01/MPO~|~Reconstruction of Fishinger Road from Riverside Drive to Mountview Road~|~04 - Reconstruction - No Added Capacity~|~9C931C994273772199BA0902CB3D6A6E29631220 111991~|~1~|~2~|~02/S>2~|~100% Upper Arlington funded items~|~04 - Reconstruction - No Added Capacity~|~B11E9351900D5C588AF42E18A04172AA2F6D5E25 108200~|~1~|~1~|~01/MPO~|~Resurfacing of White Pond Drive.~|~05 - 4R Maintenance - Resurfacing~|~D1DA273B7CCEC5BA5F96D744727F7EE17CC497F1 122305~|~1~|~1~|~01/STR~|~912' rockfall hazard SR 218-5.55 mm~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1091587C3B7132BF2F920FE405290B8F9B6B8E25 116838~|~1~|~1~|~01/ENH/WARR~|~Sidewalk replacements/repair.~|~28 - Facilities for Pedestrians & Bicycles~|~CC6373AC7B7591E2EE2E9E8DBF5526ABAFBBC25C 85631~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~7E5C3A9DDCEA1A026AC413E7AC144D535AA90BB3 102968~|~1~|~1~|~01/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~75ACA94CB53762E2C94BFDF45D2D06237B771163 87745~|~1~|~1~|~01/NHS~|~Resurfacing~|~47 - Bridge Preventive Maintenance~|~6351446D80D8F9D6CDC6DC2231FDC08C8D94A79A 83338~|~1~|~3~|~03/NFP/Brya~|~In excess of the cap.~|~05 - 4R Maintenance - Resurfacing~|~1210EDF55E98F8EA709CD4B709DDAA9C5AC404ED 83338~|~1~|~2~|~02/NHS/Brya~|~A small City funded project to resurface and install a 2-way left turn lane on WIL-127-2.01 to 2.30.~|~05 - 4R Maintenance - Resurfacing~|~8FD919A6CBB2C7F430E31164EA9E82492AB581C3 83338~|~1~|~1~|~01/S<2~|~A small city funded project to resurface & widen WIL US127 2.01-2.3~|~~|~DE961EB47C41302205E1DD172147D525723E17A6 124971~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP rural roadway~|~05 - 4R Maintenance - Resurfacing~|~8CDFCC80C2B7BA3A757EC9E1ADD311263628CD7F 99914~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for pavement markings~|~21 - Safety~|~7BFDA4DEB1C0B20A07BFA04F0DE494241DC8715B 85312~|~1~|~1~|~01/STR~|~Reconstruct Teeter Road (675') to intersect with the new alignment of Possum Run Road. 80/20 CEAO/Local Funds~|~21 - Safety~|~515EAB5B743D098EAF1C1342AE907C8613456A94 117680~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds~|~04 - Reconstruction - No Added Capacity~|~6E27011B9F018C6C92EFD3023933E9A3CB47950D 107257~|~1~|~1~|~01/IMS~|~Slide Repair~|~~|~809D151947BE4B010FEA963E45FDF985329DB564 87709~|~1~|~1~|~01/IMS~|~Resurfacing / Crack Seal~|~47 - Bridge Preventive Maintenance~|~BDFEFB2B0A6FF15E4357CF4D608B25F135DA6C94 115030~|~1~|~2~|~02/NHS~|~MED US 0042 00.48-Culvert Replacement. ~|~04 - Reconstruction - No Added Capacity~|~6A8DA53D8CDF7890B3B5B8371FD66ED50EABD56C 115030~|~1~|~1~|~01/STR~|~MED US 0042 12.87-Culvert Replacement.~|~04 - Reconstruction - No Added Capacity~|~4A3EA2E7238241CE8ED82D33ECAB595725F58DF8 121538~|~1~|~1~|~01/NHS~|~Signal upgrades/replacements.~|~21 - Safety~|~8F9F93177DD53C4069AA8D6B16925D375D267347 122387~|~1~|~1~|~01/NFP~|~Metro Parks paving.~|~05 - 4R Maintenance - Resurfacing~|~51954606AF9D72B04DCC3E060511B725E95B9662 122387~|~1~|~2~|~02/NFP~|~Allardale Park parking lot.~|~05 - 4R Maintenance - Resurfacing~|~53277D46CE7DCE4F59C040B161AED7BFD2E4EA9C 108159~|~1~|~1~|~01/S>2~|~Replacing the wooden bridge decking with concrete, creating an ADA compliant ramp and improving the aesthetics of the bridge.~|~13 - Bridge Rehabilitation~|~BFECC29652C457AFA7FD97130645FC39D0E1E99C 123382~|~1~|~1~|~01/NFP~|~Crack sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~61FBB00F17E7D6872A26690F68D39E5C80B1D2D9 121341~|~1~|~1~|~01/S5K~|~added STP ~|~05 - 4R Maintenance - Resurfacing~|~B50B187A3E5BC041F2ABA7D3CF56FB08D75D45F5 87262~|~1~|~2~|~02/BRO~|~Concrete deck overlay & abut repairs (BR eligiible) DEL-37-22.13 over Prairie Run ~|~13 - Bridge Rehabilitation~|~0201DE0D02359C134910006C6A88C468E031353E 87262~|~1~|~1~|~01/STR~|~Concrete deck overlay, parapet replacement, approach guardrail replacement (not BR eligiible)DEL-37-4.53, over Scioto River~|~13 - Bridge Rehabilitation~|~F19A1C71B3CBC00A62FF4396161787E561F63397 119293~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~FBABDE03DE01916BF3417E8B31D43A54DB27D1A5 89029~|~1~|~1~|~01/IMS~|~Work replacing or reconstructing bridges. Work not eligible for federal BR funds.~|~10 - Bridge Replacement~|~7FBB06FC11ED6E759A6806905BFB20A0E8BDBD94 89029~|~1~|~2~|~02/IMS~|~Work reconstructing the Interstate including the ramps. Does not include work replacing or reconstructing the bridges. The bridge work is in another split.~|~04 - Reconstruction - No Added Capacity~|~A6AFD3DFEA700B56E08106C80FFC2E32FEDEDAF8 89029~|~1~|~3~|~03/ENH~|~Transporation Enhancement eligible activities.~|~17 - Construction Engineering~|~E6C46202A227B5893CEE5441B387970DED8AE1E7 98070~|~1~|~2~|~02/S<2/POW~|~Powell Urban Paving 80/20SLM 2.26 to 3.87~|~05 - 4R Maintenance - Resurfacing~|~5C0FF1B080D66ECA095B9AD343C04807FAA89DED 98070~|~1~|~1~|~01/STR~|~STP Rural 80/20SLM 0.00 to 2.26; 3.87 to 4.43~|~05 - 4R Maintenance - Resurfacing~|~9E34F5C9CBFE42A4030769E56C171AD07DEA1FF7 87185~|~1~|~1~|~01/NHS~|~Resurfacing a portion of US 35 in Greene County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. Also includes bridge sealing.~|~~|~77999D28DBF95F4021EF24C75CF3A4358214D851 119153~|~1~|~2~|~02/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~590F81FA558B51067499179EB5EAB12D97F38FCE 119153~|~1~|~1~|~01/IMS~|~Interstate plan split.~|~05 - 4R Maintenance - Resurfacing~|~2E5270BB032715D81B4C2ABCCDF316007CA80464 115191~|~1~|~1~|~01/S>2~|~Widen roadway from two to five lanes with a two way left turn lane. A new 5 foot wide sidewalk is proposed on the south side that will connect an existing shared use trail at Robert F. Mays Park to the intersection of Sheehan Rd. and Social Row Rd. There is an existing shared use trail on the north side that will remain or be incorporated into the project with minor improvements.~|~03 - Reconstruction - Added Capacity~|~45D752674A0764C9C7D8AB1922640F1B20B56240 105932~|~1~|~1~|~01/MPO~|~complete streets treatments eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~7359FA5B25D05574E41D409CA8AA6A05EF40242A 105932~|~1~|~2~|~02/CMQ~|~Work to construct Lorain Avenue Cycle Track from West 20th to West 65th Street that is eligible for CMAQ federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~29FF343DE29ACF65607959A8B946263A599C9309 109454~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~EE83DD62F2CF538B45C51D6DF2F02DC5A7BB7CAD 109454~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~5E31EA7D7E808DAAAEC15DED5F02262279BDEAB4 109454~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~8940C25D7C356F30FF26AC60737F4590AC491DDF 113513~|~1~|~1~|~01/NHS~|~2" mill and fill with asphalt concrete in the City of Greenville:SR-49 SLM 16.36-16.68~|~05 - 4R Maintenance - Resurfacing~|~5AC4C4570236E29D9D6878E3F71B21D32BF1CF35 113513~|~1~|~2~|~02/S<2~|~2" mill and fill with asphalt concrete in the City of Greenville:SR-49 SLM 15.18 to 15.50~|~05 - 4R Maintenance - Resurfacing~|~D35F69D4D9ED21C29FDB6A20111C0D3013334714 82461~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 141 7.74-16.03. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~698C960A45FB230025549AEE24B446A59D1542B6 82461~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 7 0.00-5.21. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E39B2B286D82814FA6D3EAECBDCF76D538CDFDBF 107647~|~1~|~1~|~01/NHS~|~Signal Replacement. ATH 50 4.75.~|~21 - Safety~|~7987900B89FC6BD75DEB0D602F140544A5CFED63 86324~|~1~|~1~|~01/ENH~|~Sidewalks on both sides, handicap ramps, storm sewers, street lighting, and traffic signal installation fromon 600' North of Shull Rod to Gibson Road.~|~28 - Facilities for Pedestrians & Bicycles~|~5CAB41EE0E03621FAC3665A988CA68E39E25472D 86324~|~1~|~2~|~02/MPO~|~Widen roadway to match the previous phases by adding thru lanes from 600' North of Shull Road to Gibson Road.~|~04 - Reconstruction - No Added Capacity~|~E55192D4ABF9FA52256E44CEEF2A5F957A66E1B7 101133~|~1~|~1~|~01/STR~|~DSR# BEL-009~|~04 - Reconstruction - No Added Capacity~|~40B877DC362A2B1257A213C8184A2E51E776F0D7 93870~|~1~|~2~|~02/NFA/LCEO~|~"02/NFA/OT/LCEO" - County Engineer's Association Highway Safety Improvement Funding 4HB7(100% Federal) - CAP = $300,000.00 Federal dollars total for Plan Split 1 & 2 - Installation of Guardrail on NOFAS Routes throughout the County; 1) Dayton Road (Lic-CR 260); 2) Northridge Road (Lic-CR 21); 3) Welsh Hill Road (CR 121); 4) Grandview Road (Lic-TR 143); 5) Canyon Road (Lic-TR 137); 6) Martinsburg Road (Lic-CR 204); 7) Christland Hills Road (Lic-CR 596); 8) Midland Oil Road (Lic-CR 5/CR 332);~|~21 - Safety~|~4E79FAA020AFA96347F95B7D513798F7EADC68C9 93870~|~1~|~1~|~01/STR/LCEO~|~"01/STR/OT/LCEO" - County Engineer's Association Highway Safety Improvement Funding 4HB7(100% Federal) - CAP = $300,000.00 Federal dollars total for Plan Split 1 & 2 - Installation of Guardrail on Martisburg Road LIC CR204 13.40 to 13.43~|~21 - Safety~|~70E86D54B51FBB3D20353D2DDECD2FD4136BC61E 103263~|~1~|~1~|~01/SAF~|~District wide pavement markers~|~21 - Safety~|~A894A267E31B288130388ACD64C7FEAEE5EBE579 103263~|~1~|~2~|~02/SAF~|~Polyester pavement markers on MIA-IR-75 SLM 4.92 to 10.84 - MOT-IR-70 SLM 17.32 to 12.55.This plan split is paid with Safety funds.~|~21 - Safety~|~92B7A626FE45EDE8E0CDD27ED36F409A6FFFDFD8 96698~|~1~|~1~|~01/NFA~|~Portage/Trumbull Full Service Facility~|~01 - New Construction~|~DBD008D38FDBED067E63F3F43EC9FF76BCE2BF91 96698~|~1~|~2~|~02/NFP~|~Construct new Portage County Full Service Facility.~|~01 - New Construction~|~8E6F79DBFC7053D8FC04E2C6BF7D41D6027CB7BD 104758~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in ATB, MAH and TRU Counties.~|~21 - Safety~|~923A6B012D6BD52FB1B9F753B74EF77C880A7DFC 114330~|~1~|~1~|~01/NFP~|~Split for tree maintenance~|~99 - State Preventative Maintenance~|~B7F4B84B0C0B8204B3FFB7B78D3322332C7838FC 121403~|~1~|~1~|~01/S>2~|~W. North Broadway bridge Rehabilitation (SFN 2531496)~|~13 - Bridge Rehabilitation~|~64D72E85FC44DA23395E163037177E2A18A8B43D 87704~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~EC815B777ECD384E094A2D06E532F90D8F998177 121715~|~1~|~1~|~01/MPO/SUCE~|~Reconstruct pavement, includes bridge replacement 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~816C51586F6D4489AFFE8A38D553BD0FDE910273 123283~|~1~|~1~|~01/IMS~|~Bridge repair project. Pile encasements. NOB 77 0.77 L (SFN 6100031) and R (SFN 6100066) and NOB 77 16.80 L (SFN 6100902) and R (SFN 6100937).~|~13 - Bridge Rehabilitation~|~84742F2A4924AFB7DDB7BC378A48F7E2700D61D6 126651~|~1~|~1~|~01/STR~|~Bridge repair~|~13 - Bridge Rehabilitation~|~39F60AC249EED72098E85F86429151639BDE0493 82265~|~1~|~2~|~02/IMS~|~Systematic Sign Replacement Program~|~21 - Safety~|~1D35B87AE9B9FB8D64D9B258C3D8EEBE5F7FBCED 82265~|~1~|~3~|~03/NHS~|~Systematic Sign Replacement NHS System~|~21 - Safety~|~5DAA3ABC4FE5ACFA6358D98C169F4C38BB17051E 82265~|~1~|~1~|~01/S>2~|~Sign Replacement~|~21 - Safety~|~8B7BBF330977ABCEA0EA6A782CFFE5F5E9F24FE5 123045~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~57427CE9CEF5C42C9B9FB138C7C4955F29CB4B6A 98920~|~1~|~1~|~01/NHS~|~Emergency bridge repair project. GAL 35 17.68, SFN 2701448. Type B Emergency. NHS route funded 100% state.~|~13 - Bridge Rehabilitation~|~048D9999D0E095871CFC0DD450DDDCAE0858D9C8 124340~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~B5EE5C84D8A26896B8BCEA6EC876A8002616CF69 95964~|~1~|~2~|~02/NFP~|~Salt building structural truss design deficiency repair.~|~44 - Other~|~7E889D1C1FBF7D2ABEF3F9EB71EA8AA927BB40EB 95964~|~1~|~4~|~04/NFP~|~New 40' x 120' Pole Building with 6 bay cold storage at 4800 square feet. Demolish cold storage building.~|~44 - Other~|~8047B69B0A2DC32DE4495F37C1670E8F02226958 95964~|~1~|~1~|~01/NFP~|~Close north end opening of salt building with concrete from the slab to top of existing walls.~|~44 - Other~|~94B7EF8BE83735B6593B70BA7680D530015F3748 95964~|~1~|~3~|~03/NFP~|~New 40' x 120' Pole Building with 6 bay cold storage at 4800 square feet.~|~44 - Other~|~DFD770BC1B18DE2420D133820FAD55025CF3462A 109240~|~1~|~1~|~01/S<2~|~Replacement of RIC US 42 6.51 Liner installed at RIC US 42 06.74~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~57CE76294A2404C91C8B2A3CF52C933E19081F71 93016~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing with related work on Mus-IR 70-05.73 to 10.66~|~05 - 4R Maintenance - Resurfacing~|~796D5354266986E340B48BD5D9BFF27AF74124F9 95460~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Per-SR 93-00.00 to 12.57; 2) Per-SR 216-00.00 to 01.88; 3) Per-SR 595-00.00 to 02.10~|~~|~9A6AE3DB3FAA68400B6F05FB83B0E3AD1B4C528E 114998~|~1~|~1~|~01/STR~|~Traffic Signal and Highway Lighting Maintenance.~|~21 - Safety~|~9C4F43CEADCF96CB1395E5E4C68A0BEED95706E3 102165~|~1~|~1~|~01/NFA~|~Fundling split to cover slope stabilizations, associated guardrail costs and any other costs not covered by other funding events.~|~44 - Other~|~254AB2964BD8D63FB6006068A114962E0435E30B 105782~|~1~|~1~|~01/S5K~|~plan split for the small urban section of WAR-122~|~05 - 4R Maintenance - Resurfacing~|~BED55A70F701FCE1C6CDCE3BB95D17FB576534B1 105782~|~1~|~2~|~02/STR~|~plan split for the rural sections~|~05 - 4R Maintenance - Resurfacing~|~941FBE666740952538BDB61953CAB5E6C4FF3ADD 105782~|~1~|~3~|~03/NHS~|~plan split for the NHS segments of WAR-122~|~05 - 4R Maintenance - Resurfacing~|~E1B41A193437F359A251A0CFFC9A86EAE048F643 121531~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~1A591545B776E2040731A7638C0C54062455A9C4 110804~|~1~|~1~|~01/NFP~|~Crack seal and fog seal the Lock 14 and Deep Cut parking lots.~|~99 - State Preventative Maintenance~|~6BD85E89FB3D4F7A3DD2F431D952A9342C27D48B 121877~|~1~|~1~|~01/STR~|~Slope Stabilization on CLE US 50 - rural section near SLM 7.1~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~532A5B798353358D3EF4204FAB42A29462C80DDE 97101~|~1~|~1~|~01/S>2~|~Type B Emergency to replace the longitudinal joint for HAM-127-1464 structure.~|~47 - Bridge Preventive Maintenance~|~C2BB8F5F7DDFA1D68FADE824B2966CB146FCA7D5 100590~|~1~|~1~|~01/STR~|~Resurfacing US-250, SR 9, SR 339 and SR 519.~|~05 - 4R Maintenance - Resurfacing~|~6928E3C3E22B5DBB90EA1286F15CC7DFAA65136A 124018~|~1~|~1~|~01/NFA~|~Pavement rehabilitation utilizing 100% State Oil & Shale (4SH7) funds up to CAP.~|~05 - 4R Maintenance - Resurfacing~|~522925215390335B461F4165A378912E9EF62F41 114969~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DAAA4589CED60B3F3CA99C8B26DAC4692FB78254 114969~|~1~|~2~|~02/STR~|~Bridge Rehab~|~47 - Bridge Preventive Maintenance~|~06E1EB6A8A3462ED25BDB3A5C7DE217EC59045E5 93586~|~1~|~1~|~01/ENH~|~Add pedestrian connections in City of Marietta through the Safe Routes to School Program, 100% Federal.~|~28 - Facilities for Pedestrians & Bicycles~|~C723B7F13387AC79106E09A0ED7D6DAC9DD5B20F 97000~|~1~|~1~|~01/BRF~|~Replacement of Vanderhoof Road structure (SFN# 7738099) over Tuscarawas River, Summit County, Ohio.~|~10 - Bridge Replacement~|~20B0932B8985C102E87DC25E8DA8BA9F16B075BC 121814~|~1~|~1~|~01/NHS~|~Work on US 33 to construct new interchange.~|~03 - Reconstruction - Added Capacity~|~3DF435A64770AD7162F01F76A06261E6B8FF47A9 121814~|~1~|~2~|~02/S>2~|~Work on TR 229 to construct interchange~|~17 - Construction Engineering~|~7537B02AA21EDD8FA724694CCF6B97D275CD0EA6 88851~|~1~|~1~|~01/NFA~|~District Preservation funds (100% state) - Resurfacing on SR709 from Carmeen Street to SR116. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds.~|~05 - 4R Maintenance - Resurfacing~|~6C983FD5C0CB25534756C1AB21EEDB1C212A83C5 117635~|~1~|~1~|~01/SAF~|~Install signal at SR 435/SR 729 intersection~|~~|~87B700960C838F9ED22BE15DF31DFC9B61AA4328 111253~|~1~|~1~|~01/MPO~|~MPO funded plans split~|~17 - Construction Engineering~|~9056DCD0B2B1F20E927D217DADFEBF23E3F2CEB6 102910~|~1~|~1~|~01/STR~|~Mill and fill on CR 330~|~05 - 4R Maintenance - Resurfacing~|~F0C08B1A418DE7B9AB9C383F860DD73634D95AF2 102910~|~1~|~2~|~02/S<2~|~Urban areas of project from SLMs 10.20-10.22 and 19.08 to 20.01~|~05 - 4R Maintenance - Resurfacing~|~C367A3F469382F2F2C41AD586ED921C171173BE4 122351~|~1~|~1~|~01/SAF~|~Extend sidewalk on Bellbrook Place, install high visibility crosswalks and ramps at Bellbrook Place/SR-161 and install RRFB with crosswalk lighting on SR-161.~|~21 - Safety~|~D8091A897EE7103284AA63CD1099DD428055AFF4 117503~|~1~|~1~|~01/BRF/PCEO~|~Superstructure replacement on bridges PRE-TR 462-1.70 (SFN 6837387) and PRE-CR 9-4.69 (SFN 6830528).~|~13 - Bridge Rehabilitation~|~0EB488E727405548993028787F41C0F1BCB16A86 119023~|~1~|~1~|~01/NFP~|~districtwide crack sealing project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~99E2094C658C3B5D653EA79CBB7A8F4F0CCA73BF 100751~|~1~|~1~|~01/NFP~|~Split for resurfacing work on US-322~|~05 - 4R Maintenance - Resurfacing~|~D290750CE840FD19C8DC496024A5599045E7F49F 104780~|~1~|~1~|~01/MPO/HEBR~|~LCATS/Village of Hebron Culvert Funding = 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of culvert CFN 1839857 at SLM 14.998.~|~04 - Reconstruction - No Added Capacity~|~7ADC03D986C8630FB229A660F9D8110FAEEED47A 104780~|~2~|~2~|~02/ENH/HEBR~|~Village of Hebron approved TA funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - For Sidewalks and ADA Requirements as part of US 40 Culvert Replacement project.~|~28 - Facilities for Pedestrians & Bicycles~|~EA77EED00D3CF417CEF557254044E63D9AC94250 116415~|~1~|~1~|~01/NHS~|~RCUT Intersection Improvement.~|~05 - 4R Maintenance - Resurfacing~|~391EE0FF601FA8A001D18AAFC783AA9FB434BED2 116415~|~1~|~2~|~02/NHS~|~RCUT Intersection Improvement.~|~21 - Safety~|~26E942341D0CC5B0DB7904CA42D188DF598ADFD6 101039~|~1~|~1~|~01/S<2~|~ATB SR 534 from 22.61 to 25.26.~|~~|~400E69AEA39995B391EFA4078BCBFF922AB8DDC7 101039~|~1~|~2~|~02/STR~|~ATB SR 45 from 19.75 to 22.28.~|~~|~4F7434DE0A2AE32016D8F79357EF8CBDC7A71B29 125576~|~1~|~1~|~01/BRF~|~Encase piles with structural repairs~|~13 - Bridge Rehabilitation~|~31DD7AFC5F4A80FC03A28E5806DC27D73D2A59D0 109786~|~1~|~1~|~01/NHS~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~00BC4332E4D3EED7EC5C83DDA4B1E20D08FD7C74 90666~|~1~|~1~|~01/MPO~|~WOO SR795 1.23-1.24 Intersection Improvement~|~21 - Safety~|~6B6C06B13A1310D0DC4414F68CB5B69A8815D7B5 123736~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~6526D8F8D7DD0855C393D9C21390AB3FA8E23487 91175~|~1~|~1~|~01/ENH~|~Project involves enhancement of the intersection of Grange Hall Road (CR-25) and Pentagon Blvd. by landscaping with shade trees, evergreens, shrubs, and perennial flowers along the northeast and southeast corners of the intersection. Project involves some minor grading work and installation of decorative retaining walls to provide suitable planting beds.~|~31 - Landscaping & Other Scenic Beautification~|~8FA0657A356C121C5BEF601487D248D2C5F93086 114625~|~1~|~1~|~01/STR~|~Bridge replacement~|~04 - Reconstruction - No Added Capacity~|~DD29B64E738626672010696A369F174B58948139 106103~|~1~|~1~|~01/SAE~|~Plan Split~|~21 - Safety~|~DE71FE0AE02F3C117C025C7C1A01766A7B12D4C9 124275~|~1~|~1~|~01/ENH~|~Shared use path repairs utilizing 100% Federal funds (80% TAP-4B37 matched with 20% Toll Revenue Credit) up to federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~D4D806D57331272C297502D3B8AAD77A9EBFF1F6 118651~|~1~|~2~|~02/NHS~|~Plan split for OTT-2 & WOO-795~|~21 - Safety~|~F4557B623D791898AC3ED50C8A29D2ED7D6B1EE1 118651~|~1~|~1~|~01/IMS~|~Pavement markings on WOO-75 & LUC-75~|~21 - Safety~|~5EAEAF8CE81BE00079401852143F7CE589D30FF3 118651~|~1~|~3~|~03/S5K~|~Plan split for WOO-25 from SLM 6.285 to 8.415~|~21 - Safety~|~848AE25C917D5E518D865F1A6E2E57A56A6A0AF6 118651~|~1~|~4~|~04/STR~|~Plan split for WOO-25 from SLM 0.516 to 6.285~|~21 - Safety~|~C5FEC62704AF73FF6A2CF0E0156D339BD91C32B8 123419~|~1~|~1~|~01/STR~|~Resurfacing SR 213~|~05 - 4R Maintenance - Resurfacing~|~28E04E626353F4574CD9A2D3C19815A919BCF519 116096~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~88FA46B6638A562C1BC6E5971272DAC53BABA74F 116096~|~1~|~2~|~02/SAE~|~High friction surface treatment (resurfacing) on the following ramps. I-77SB to US 62EB and US 62WB to I-77SB.~|~21 - Safety~|~0878733D3B8A0E9A847A72AE6321947EAE80A2B8 100386~|~1~|~1~|~01/NFA~|~SFN 8744300~|~10 - Bridge Replacement~|~C6836A8D5D4C1BAF2142B903FF02473B3EAE37F7 96642~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. HOC 180 7.35-16.51 and HOC 374 6.11-12.65. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~5BEE6E0BB1B8BA2CD419805A735EC31A27D01526 106115~|~1~|~1~|~01/NFP~|~Lighting~|~44 - Other~|~ACCAB88C3389A94E460155D02D9F2B9DA1F97C1E 110871~|~1~|~1~|~01/NHS~|~Painting of bridges on US 30 in Van Wert County which is on the NHS. District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~F8B6A2A7FE7E88B1D7B60398DE31310F976FA237 105221~|~1~|~1~|~01/S>2~|~Replace the concrete overlays of 2 bridges on Lg Urban route.~|~13 - Bridge Rehabilitation~|~74CCADA51AB58FD8A7AF72FF49CC31CB304880FF 99431~|~1~|~1~|~01/NFP~|~Guardrail repair and maintenance on various routes throughout District 4.~|~44 - Other~|~8F3993EFCCF842266FDAADFACCCF0F96A5EE44F3 109153~|~1~|~1~|~01/NFA~|~Upgrading sidewalks within the Warren City School District.~|~21 - Safety~|~131070CB62E69A0187569C05D96FC71F0D85DA17 108166~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH 144 4.92-4.94. DSR ATH-007. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FDFAFBBD7E4B65F24D0ABD46553828C23A1AEC51 116852~|~1~|~1~|~01/CMQ/MACE~|~Road diet along Glenwood Ave.~|~04 - Reconstruction - No Added Capacity~|~2F25CB08BD37EA27B52BAF8CCD8261B3AD9AFA53 95081~|~1~|~3~|~03/STR~|~Repair or replace culvert MER US 127 23.02~|~04 - Reconstruction - No Added Capacity~|~16E20539BE9B7D14DF2F8F7D8BF3F34C674E3F25 95081~|~1~|~1~|~01/STR~|~Repair or replace culvert MER SR 49-18.53~|~04 - Reconstruction - No Added Capacity~|~46EF2A567827CBA2B15BF418079AB57D6E5625EF 95081~|~1~|~2~|~02/STR~|~Repair or replace culvert MER SR 117 0.16~|~04 - Reconstruction - No Added Capacity~|~61FE9E3A6F3111CE74778A3C5BA5496BDB20735F 93314~|~1~|~1~|~01/S<2~|~Marysville urban pavingUNI-4: 13.08-14.06UNI-31: 0-1.77~|~05 - 4R Maintenance - Resurfacing~|~A15A9895D603A3B396A86E7E08FA2DB55344EA76 100881~|~1~|~1~|~01/S<2~|~LOR 90 Noise Wall Replacement~|~44 - Other~|~5AB85423EC57F0263BEC022AE80FB5153A164C24 83097~|~1~|~1~|~01/MPO~|~Mill and fill~|~05 - 4R Maintenance - Resurfacing~|~5983BDF7A5673D90052F8B810561709262640316 83097~|~1~|~2~|~02/MPO~|~100% local items.~|~05 - 4R Maintenance - Resurfacing~|~FF4FDD5E1318B14BC26A4582E0E697B4DB1B405D 108327~|~1~|~1~|~01/NFA~|~OH18-01 ER Event. Landslide repair project on MRG 376 11.00. MRG_NF_0001. Not on any federal aid system funded 100% ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~001CB4E81BE90F57A2C3E648A4B6ED02AA297FEA 99861~|~1~|~2~|~02/NHS~|~Remove existing sub-structure (LOG-33-064L)~|~40 - Special Bridge~|~486354A69DD7411FAA0958FB09D3BF6801526E4E 99861~|~1~|~1~|~01/NHS~|~Replace deck and investigate semi integral abutment conversion; investigate raising deck due to debris and overtopping.~|~13 - Bridge Rehabilitation~|~D460ED1D49D0D91D59F58888E0094BF0F7046461 80958~|~1~|~1~|~01/ERD~|~Earmark funds~|~28 - Facilities for Pedestrians & Bicycles~|~07E203F736C409BD55BC27B28A0B31C62197936D 92978~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Mus-SR 208-11.06 to 11.19~|~05 - 4R Maintenance - Resurfacing~|~785715C13B39674DE98406669700381B108C061C 92978~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 93-12.85 to 13.92~|~05 - 4R Maintenance - Resurfacing~|~96CB2078B36C1EFF43A8E5C829A6AA20F242FDF7 92978~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Mus-SR 93-13.92 to 30.97; 2) Cos-SR 93-00.00 to 03.50; 3) Mus-SR 93-31.28 to 34.58;~|~05 - 4R Maintenance - Resurfacing~|~F2CE762CE528CE09D87F24BCCE88CCE9B1CFC909 92978~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on NHS portion of Mus-SR 93-12.78 to 12.85~|~05 - 4R Maintenance - Resurfacing~|~81293577308FA5F5EDDEB39AC6FC4AED51BA1631 119931~|~1~|~1~|~01/SAF~|~All work included in this split.~|~21 - Safety~|~7D55F69C7974178F7327F03107657976CA863BAD 99531~|~1~|~1~|~01/IMS~|~Resurfacing work on the interstate using IM funds at 90/10 fed/state.~|~05 - 4R Maintenance - Resurfacing~|~7781068AD07F36BC72F9A302331DECFD5549B1AA 120124~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~6C9F0514538A1A44D6DDF6AC55700599189D910B 101185~|~1~|~1~|~01/STR~|~Added Plan Split 1, STP Rural, includes DEL 257 0.00-7.80, 8.37-14.26 and DEL 750 4.43-7.26.~|~05 - 4R Maintenance - Resurfacing~|~1ECA165FF19EE92030B02FA87BC26ED3DE03F946 92116~|~1~|~1~|~01/S5K~|~Plan split for resurfacing of SR-2 from SLM 7.46 to 9.781~|~04 - Reconstruction - No Added Capacity~|~D66B5CE64DC4B69CB550B15C1B7C2940889C1200 92116~|~1~|~2~|~02/STR~|~Plans split for resurfacing of SR-2 from SLM 9.781 to 13.25~|~04 - Reconstruction - No Added Capacity~|~1B486C03A794ED5F00656EBCA184F7B0B7D3EA7A 105582~|~1~|~1~|~01/NHS~|~NHS General System Split DEL-3, various locations on DEL-23, FRA-3 & FRA-62~|~05 - 4R Maintenance - Resurfacing~|~6FA5399BE0AB738B21F4894526DC2F69A159E8F3 105582~|~1~|~2~|~02/S>2~|~Columbus Urban Area Split: DEL-37-23.08-23.17 DEL-61-0.43-2.72 DEL-203-0.00-0.01 DEL-23-7.26-7.43 & 7.64-7.87 FRA-315-12.79-12.91 FRA-605-1.71-1.87~|~05 - 4R Maintenance - Resurfacing~|~7CF4D36BFDC383E17B840B2234C996087A7A206A 105582~|~1~|~3~|~03/STR~|~Rural Plan Split: DEL-37-23.17-29.08 DEL-61-2.72-7.84 DEL-203-0.01-0.06~|~05 - 4R Maintenance - Resurfacing~|~AADE7E894AF0DD922EC80F841B1B6A7FF1E8DBEA 105582~|~1~|~4~|~04/NHS~|~Priority NHS Plan Split: Various locations on DEL-23 DEL-36-12.45-12.70 & 12.81-12.83 FRA-104-10.51-12.98~|~05 - 4R Maintenance - Resurfacing~|~CBF2A37A8EF7500B29BC32AA6B11EA65E7A65B38 105582~|~1~|~5~|~05/S<2~|~City of Delaware Plan Split: DEL-36-11.29-12.45 & 12.70-12.81~|~05 - 4R Maintenance - Resurfacing~|~ADA4B2ABE330748B73BF1B2E7B4716FBB53CCAE0 105582~|~1~|~6~|~06/S>2~|~City of Columbus Plan Split: FRA-315-12.45-12.79~|~05 - 4R Maintenance - Resurfacing~|~FB92A9F3730E5F28ADAD004750C4D21ADB8FF7B4 82032~|~1~|~1~|~01/STR~|~Resurfacing WAY-003-26.13 - 28.35 / MED-003-0.00 - 3.80~|~05 - 4R Maintenance - Resurfacing~|~52AF84C6713AE1A54F83D2D11DF43DB8C9E68114 82032~|~2~|~2~|~02/BRO~|~BR Funded Bridge Replacement - MED-003-0221 sfn:5200024~|~13 - Bridge Rehabilitation~|~E93167045A4C2C449C13DC3AB84874A6F051AA19 95377~|~1~|~1~|~01/NFP~|~Waterline work to be performed by Mercer County Engineer for ODOT facility. Reimbursement will be made to County as work performed.~|~44 - Other~|~6E2B54B8878BE96CB744E7FEFEE8D034A1E5A525 92748~|~1~|~1~|~01/BRO~|~8706905 WOO SR579 1.84 Intersect: Cedar Creek~|~10 - Bridge Replacement~|~D161C9D65D5CF2DF2FA1614F1B89E0DD8AC03F3C 123012~|~1~|~1~|~01/NHS~|~Districtwide signal installation and repairs.~|~21 - Safety~|~61C9AE929F63281B0BED70B1868CD58010F3E2ED 119346~|~1~|~1~|~01/NHS~|~Deck replacement.~|~13 - Bridge Rehabilitation~|~2704CB6E65D027737598419176AC5227EF1D444B 111359~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads in Hocking HIlls State Park. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~875DB53A8E97750EA40879D4BD8BF72026F2C7CB 123251~|~1~|~1~|~01/S5K~|~Culvert repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A9D30A51CBA2B5F72F437F4053A7D628ACA086A4 105184~|~1~|~1~|~01/MPO~|~Construction of a shared use path along Kemper Road from US-42 to the Sharon Woods Park - Lakeview Lodge driveway.~|~~|~280E71DC930F4422CD88E1FEC0ED58B69791DF1E 112776~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~FCD0D1BE9A711A8993AE420A5C1DA51ABB18EC75 112776~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4145AA0D67F13469E5DF0DE338C6E7C45782F49F 93830~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: Located on SR247, 0.04 mile norht of the Adams County line. Project Description: It is proposed to replace the structure, SFN 3603482 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~20CF10A826DEC1DCCD23EFAF10C06375F15EBCDC 114366~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ "~|~05 - 4R Maintenance - Resurfacing~|~F8CE846579A5E7FA2ED25060466C6110A2753594 125373~|~1~|~1~|~01/S5K~|~Raised pavement markers.~|~21 - Safety~|~E93F0EEB2D36F14510AF8596CF393B28CD51A803 93252~|~1~|~1~|~01/IMS~|~Overlay bridge deck, patch piers, retrofit parapet and rail, restore expansion with semi-integral abutment conversion with new approach slabs, paint and seal structures on SFN 7502192 SHE 1108 TR 15 (Sharp Road) over IR 75.~|~~|~54472F302D42445A5DEB28636BA3C99C546379CF 101666~|~1~|~1~|~01/IMS~|~Crack sealing on DEL-71-1.60 to 11.55; FRA-270-48.47 to 52.16~|~05 - 4R Maintenance - Resurfacing~|~470D4E7D780636CC559DE2FD5752A6EDF6408DAD 101666~|~1~|~2~|~02/NHS~|~Crack sealing on FRA-161-13.97 to 14.01; FRA-161-14.31 to 14.85; FRA040-6.96 to 7.60~|~05 - 4R Maintenance - Resurfacing~|~5902E4E739F25A1F431D741091D01BA42FE1567F 101666~|~1~|~3~|~03/STR~|~Crack sealing on DEL-37-23.30 to 29.08; DEL-4-0.00 to 1.98; DEL-42-13.27 to 19.17; FAY-22-10.98 to 17.62; FRA-665-0.00 to 3.31; FRA-665-5.18 to 7.39; UNI-4-24.28 to 26.25~|~05 - 4R Maintenance - Resurfacing~|~C2A533A656200745930331371B314D3C052B70D4 101666~|~1~|~4~|~04/S>2~|~Cracking sealing on DEL-42-12.37 to 13.27; FRA-161-0.00 to 0.83; FRA-40-4.43 to 4.69; FRA-665-7.39 to 8.34~|~05 - 4R Maintenance - Resurfacing~|~B7D6A4ADCEE02AD495212EF4A0D2D6CE9D85BB90 101666~|~1~|~6~|~06/NFA~|~Crack sealing the Ohio Air National Guard and US Naval Reserve parking lots. To be paid by ISTV~|~05 - 4R Maintenance - Resurfacing~|~56FD26CFADBB57FA390331C14C521FEB13CB7009 101666~|~1~|~5~|~05/S<2~|~Crack sealing on FAY-22-10.33 to 10.98; FRA-62-1.34 to 1.64; FRA-665-3.31 to 5.18~|~05 - 4R Maintenance - Resurfacing~|~BBC012253ACC48B04E2D53A7641D864A42DE9B4E 99647~|~1~|~1~|~01/STR~|~Replacement/rehabilitation of multiple culverts in the District~|~04 - Reconstruction - No Added Capacity~|~A673664055CA532710DAE121E50A792D4DB5CFCE 101351~|~1~|~1~|~01/STR~|~Microsurfacing on the following sections: FAY-38-5.47-13.38 FAY-238-0.00-1.04~|~05 - 4R Maintenance - Resurfacing~|~68F069893CF3297BBD71375B8B0BBD965E80E6C3 101351~|~1~|~3~|~03/S<2~|~Resurfacing on the following sections: FAY-41-10.34-10.64, 13.04-15.48~|~05 - 4R Maintenance - Resurfacing~|~F6EFE11BCEF4F91EEFA528788490C4760CEF81F5 101351~|~1~|~2~|~02/STR~|~Resurfacing on the following sections: FAY-41-0.00-10.34, 15.48-29.05; UNI-161-0.63-6.12~|~05 - 4R Maintenance - Resurfacing~|~BE8D7328C9D1C125697182BBA3BE069CF51FD777 101351~|~1~|~4~|~04/S>2~|~Resurfacing FRA-315-11.82 to 12.14~|~05 - 4R Maintenance - Resurfacing~|~93588E58AF50F53939AEF9593F35BD39F9359A8E 94176~|~1~|~1~|~01/BRO~|~Replace culvert carrying SR 170 over Branch of North Fork Little Beaver Creek.~|~04 - Reconstruction - No Added Capacity~|~E197D4D571DF841011B5DB3FF8CFC8A225B69259 88917~|~1~|~1~|~01/BRO~|~Replace existing twin CMP pipes (COL-164-1414, SFN 1504029) in kind or with a four-sided concrete box.~|~10 - Bridge Replacement~|~658A0E623314C54ECE771C013A9C32EEFE9CAA3B 108241~|~1~|~1~|~01/NFA~|~ODNR slip project in Tar Hollow State Park.~|~04 - Reconstruction - No Added Capacity~|~26B8382C715B81BA9D957A4A87A80D192632E552 100502~|~1~|~3~|~03/STR~|~Bridge plan split placeholder.~|~47 - Bridge Preventive Maintenance~|~496013A3F82F21212525FF2AD3BC759B977A49F9 100502~|~1~|~1~|~01/S<2~|~HIG 50 (14.98-15.56)~|~05 - 4R Maintenance - Resurfacing~|~6297F714D5811A023EA0B55769DCAA3BE6491A2E 100502~|~1~|~2~|~02/STR~|~HIG 50 (15.56-18.23)~|~05 - 4R Maintenance - Resurfacing~|~7703C79161041DA44DC84EC54008500DF46F597C 100502~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~939E32E11D8E25283BA9C190DC65FEF5E85040AE 123711~|~1~|~1~|~01/NHS~|~Plan split for all bridges on the NHS~|~47 - Bridge Preventive Maintenance~|~DB43B2AE39CF7E8CD1647B2956CAEE124B600B12 123711~|~1~|~2~|~02/BRO~|~Plan split for all bridges not on the NHS~|~47 - Bridge Preventive Maintenance~|~2B578AC93759BCF62913F3023B54D3911676A46F 99063~|~1~|~1~|~01/STR~|~Apply Herbicides along roadside for week control on 2 lane highways - AUG/LOG/CHP/CLA~|~44 - Other~|~F8C7C2A334A9C9AD11E4476E6C4D29B04D12A1DE 98467~|~1~|~1~|~01/STR~|~All work outside of the City of Delphos. This includes all work on US 224 and all work on SR 114. District Presevation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~37AC289FBF80BC479FB9FAD1401E204EF2414DD6 116479~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F356AD4DFB6CAEBBD67CE3B1285B230A81088B25 109136~|~1~|~1~|~01/SAF~|~Construct sidewalks along Kingsford Rd between Eakin Rd and Briggs Rd~|~21 - Safety~|~41E24592AECA53DA3329DAF564A9C449DF478372 121413~|~1~|~1~|~01/SAF~|~Federal items.~|~21 - Safety~|~9C9600532C43B38ADFF442392AC2C84DC744C36B 107292~|~1~|~1~|~01/CMQ~|~Improvements to the existing intersections of US-50 with SR-132 in the Village of Owensville.~|~21 - Safety~|~4767D971A14E915AC8B8C7F9902147EE2FBE09FC 107292~|~2~|~2~|~02/CMQ~|~100% local match for water line replacement~|~43 - Utilities~|~A4DE493D621BFE10E6D18685162CF58740615B6C 107292~|~1~|~3~|~03/SAF~|~Pedestrian safety improvements including sidewalk, ADA compliant curb ramps, high visibility crosswalks, and traffic signals. ~|~21 - Safety~|~069A3FD8BAE398D0BAB0A03A593C1D7B4AE6DF1B 109130~|~1~|~1~|~01/STR~|~Test~|~05 - 4R Maintenance - Resurfacing~|~9A95945A60FCEFEF8BC7C0F988D6646C1E2B8607 93370~|~1~|~1~|~01/NHS~|~Priority system paving of FRA-315: 2.37-5.18~|~05 - 4R Maintenance - Resurfacing~|~46275BC9F210865BEB62135CAD853CB298DCF760 93370~|~1~|~2~|~02/IMS~|~Priority system paving of FRA-71: 18.34-19.09~|~~|~862971EFA6E86A3FEBEADA10A55DBDB753003536 126880~|~1~|~1~|~01/NHS~|~Structural steel repairs due to multiple bridge hits from the same incident.~|~13 - Bridge Rehabilitation~|~9EB8C014F8390AC9300C195D82FA9C8EDBD32454 111006~|~1~|~1~|~01/SAF~|~Split 1 for work at Mayfield Road~|~21 - Safety~|~071556D035566732C284A701DF4EE486798367D7 114100~|~1~|~1~|~01/S>2~|~Danube Court bridge rehab: Replacement of the superstructure with prestressed concrete box beams with a composite concrete deck (this will be re-evaluated to avoid hydraulic impacts). Also, minor substructure modifications/repairs, as well as related roadway and storm sewer adjustments and restoration.~|~13 - Bridge Rehabilitation~|~8E641B6B6B1C8CD841FEE9BE8BF8C1B0E97E98D4 107483~|~1~|~1~|~01/CMQ~|~Plan Split~|~17 - Construction Engineering~|~872A1CF7B1942D0EB1390EC580A001960127A383 107795~|~1~|~1~|~01/MPO~|~Resurfacing of CR 50 from 2.03 to 2.85 in the cities of New Franklin and Green.~|~~|~636AF968D6CF51DB0BA9853B338AFD0F156D2FDD 96196~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~F6DB92BD2DD5C98FBCF8D25C563E12AC9E37778B 112331~|~1~|~1~|~01/NFP~|~Bridge Operation Plans split~|~44 - Other~|~7E066E57E542A4057321ED712F7CAEB2F1BECF24 86840~|~1~|~1~|~01/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~0A385081862746539D32B13E1F790895098D0D98 86840~|~1~|~5~|~05/NHS~|~Bridge Work~|~13 - Bridge Rehabilitation~|~284C9EAA4CF0568D5FA8D77C7D0E9A8D5242FE61 86840~|~1~|~3~|~03/NHS/RITT~|~AMATS / City of Rittman Pavement Repair~|~05 - 4R Maintenance - Resurfacing~|~7D4E516CB9B1477AF8BC3B16F75CD5F343395FEF 86840~|~1~|~4~|~04/NHS/RITT~|~100% City of Rittman Items~|~05 - 4R Maintenance - Resurfacing~|~9A28526C865D7E7298107AB3FBD68CF36D39419D 86840~|~1~|~2~|~02/NHS~|~Urban Paving - 80/20 - District Allocation/City of Rittman~|~05 - 4R Maintenance - Resurfacing~|~EBBB0124E5B4076B855D46985B16ED12A08E50D1 107179~|~1~|~1~|~01/STR~|~ROS SR 207 13.55 Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~794E141A3A0F2D06A2C248F65682179D19AC091D 93362~|~1~|~1~|~01/NFP~|~From Galbraith Road north to Sharon Road along IR75 Demolition of buildings acquired and to be left vacant until main construction phase of thru the valley. Buildings are being acquired under HAM-75-12.60 PID82288. There are approximately 39 buildings under pid82288.~|~03 - Reconstruction - Added Capacity~|~78D43D8C4400EE6C4D82B5C6B0C9B83ACDFE2F5E 108375~|~1~|~1~|~01/MPO~|~Resurfacing of S Van Buren Ave and W Waterloo Rd within the City of Barberton.~|~05 - 4R Maintenance - Resurfacing~|~9FBB8B6A45B9B60A86A24788E2BA99A08E3A0549 96440~|~1~|~1~|~01/BRO~|~Replace existing box beam bridge (JEF-164-0525, SFN 4103033) with new structure.~|~10 - Bridge Replacement~|~1260F21E7B783EF852AA40E717A5F4DBE8E1CE27 96440~|~1~|~2~|~02/BRO~|~Plan split no 2, for Railroad construction costs.~|~22 - Rail/Highway crossing~|~8EC687E7815849EF5DBB4351A71196E741C55910 96064~|~1~|~1~|~01/NFP/SUMM~|~Resurfacing of parking lots and driveways in Cascade Valley MetroPark, Silver Creek MetroPark, and Munroe Falls Metro Park, in Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~58C9CA47BE0135149B90BB7F50C0E20CFB317C86 95584~|~1~|~2~|~02/S<2~|~HIG SR 28 15.35-15.43HIG SR 138 32.48-32.79HIG SR 753 17.49-18.03~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D28491E2129F6730793F4573800D52F3A47FD52 95584~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~A7CB2732E5C7D723D5BDDAE6B4DC4BE61D2A49D5 95584~|~1~|~1~|~01/STR~|~HIG SR 28 7.27-15.35HIG SR 753 13.10-17.49~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB9C0909E5B2C046C0EC8DCE67667EB185B6A5F6 121351~|~1~|~1~|~01/IMS~|~Plan split for approach slab work associated with bridge LUC-475-0254~|~47 - Bridge Preventive Maintenance~|~AD574E98D647566D40C1050FDB1244EDA7B3C2FA 121351~|~1~|~2~|~02/NHS~|~Plan split for resurfacing work~|~17 - Construction Engineering~|~1C81895A0D1CD59A0C0606D06DAFF9ABDAE8EFF4 102014~|~1~|~1~|~01/IMS~|~Landslide repair projet. NOB IR 77 2.81-3.13. 90% Federal and 10% State funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~96FFE9B4D3386920F8E8019FBFB176B4934894FF 81081~|~1~|~1~|~01/STR~|~General system resurfacing in rural func classMAD-142: 11.45-13.34 plus area between I-70 rampsMAD-665: 3.28-11.1201/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~02681BA898810824E7D7D5991A0584A5B44F1851 81081~|~1~|~6~|~06/STR~|~80/20 bridge work (not BR eligilbe):SFN 4903676, MAD-142-12.69, over Silver DitchSFN 4904354, MAD-665-5.53, over Glad RunSFN 4904397, MAD-665-6.33, over Morehead Run06/STR/BR/~|~05 - 4R Maintenance - Resurfacing~|~472A38E9490084925758EE31204534D00C574048 81081~|~1~|~4~|~04/IMS~|~Bridge work over I-70 (not BR eligible):SFN 4902793, MAD-142-13.41L, over I-70SFN 4902823 MAD-142-13.41R, over I-7004/IMS/BR/~|~05 - 4R Maintenance - Resurfacing~|~5D58F3A64F7150C8C40412E231AC283643362DAF 81081~|~1~|~3~|~03/S<2~|~General system paving in urban func class areaMAD-665: 1.17-3.2803/S<2/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~6746E79BE2E9FCF299FD83AB76774FEB477D5642 81081~|~1~|~5~|~05/S<2~|~80/20 bridge work (not BR eligible):SFN 4904257, MAD-665-2.58, over Payne Ditch05/S<2/BR/~|~05 - 4R Maintenance - Resurfacing~|~A5E159894D7C0344E1887F2F18D146039055EC1A 81081~|~1~|~2~|~02/S<2~|~Urban paving in London in urban func class areaMAD-665: 0.32-1.1702/S<2/PV/F_LC~|~05 - 4R Maintenance - Resurfacing~|~FA69EFDE3E814F064A67EB1EC2DDC613B2495E98 88692~|~1~|~1~|~01/STR~|~Berm stabilization and resurfacing of the existing roadway with asphalt concrete on State Route 119 from SLM 4.41 East of State Route 29 to West Corporation Limit of the Village of Anna (SLM 7.76)~|~05 - 4R Maintenance - Resurfacing~|~59FC924200F675F05083A181CC59C16C5C65B0F1 122830~|~1~|~1~|~01/MPO~|~Township of West Chester EV projects 2026~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~521700FC2E8070333A4A73FFC6B5D32030480E02 90654~|~1~|~1~|~01/NHS~|~culvert at SAN SR53 14.73-14.74~|~~|~D4153790C1C8D314881C9CE8B89E7806E2FBED64 99737~|~1~|~1~|~01/IMS~|~New interchange at 474/Dorr St~|~01 - New Construction~|~D4731CCB90CCB7C97693DED745EDED765F8B8AA5 99737~|~1~|~2~|~02/NFA~|~Build a new interchange in Lucas County on IR-475 at Dorr St~|~~|~4D02041BED7E9C2F81AE7AE11F8FF31BBC0CEB0C 93533~|~1~|~1~|~01/SAE~|~HAWK Signal on Plainville Road at mid-block crossing in front of school entrance; New School signing on streets surrounding school; and bike racks at the school.~|~21 - Safety~|~3491EB5ECFEC5B3A18A427A88782E50B94526696 96977~|~1~|~1~|~01/IMS~|~Herbicidal Spraying on various routes in District 4.~|~44 - Other~|~639BA80E10AE4F30C67F9AA16BB0F790BE062257 112788~|~1~|~1~|~01/ENH~|~Installing new sidewalk on western side of Cleveland-Massillon Rd from SR 18 to Springside Dr.~|~28 - Facilities for Pedestrians & Bicycles~|~8A37DABF7FCB36065CC36FF4ECCF740BAE180F6B 103837~|~1~|~1~|~01/NFA~|~The Village will widen and improve 1,275 feet of TR 98 and widen the access of Arrowhead Drive which leads into Arrowhead Commerce Park off of SR 199~|~01 - New Construction~|~1AEAED06F59878FC070AFA793F35375B17451CF6 90981~|~1~|~1~|~01/SAE~|~100% Safe Routes to School funding for various sidewalks, ped crossings with Village of Plain City~|~28 - Facilities for Pedestrians & Bicycles~|~F45273B89D3085FEBCF1BAA96A80A415271ED8E4 99729~|~1~|~1~|~01/ENH/GREE~|~Constructing new sidewalks along Raber Road between Troon Drive and Mayfair Road.~|~44 - Other~|~88B2FC95FBEDD7D754A09103C41A2380CA78F509 98659~|~1~|~1~|~01/IMS~|~Plan split for interstate striping~|~44 - Other~|~6FC66E61375C19FB8986D3EFBE56C1BD3931C355 98659~|~1~|~2~|~02/NHS~|~Split for work on the NHS~|~44 - Other~|~C22E9AE9953C2610BF45A0797A14B5F6FE4CF258 98659~|~1~|~3~|~03/S>2~|~Split for work on the urban STP routes~|~44 - Other~|~9A250B58B9A63012A87791A1E3406A49D80F6335 98659~|~1~|~4~|~04/STR~|~Split for work on the rural STP routes~|~44 - Other~|~B45CD4FA445FA6CE92C3836DF3144A715E1AC2D2 121167~|~1~|~1~|~01/STR~|~All Work is in this split~|~21 - Safety~|~0227C149DEEF02160C614789D54A9CACE1DD2715 87260~|~1~|~5~|~05/S<2/Chil~|~In the urban paving area LSM 24.13 - 25.12 & 25.21 - 25.25, the city is responsible 100% for full depth repair and joint replacement also including median repair.100% local match~|~05 - 4R Maintenance - Resurfacing~|~1B8B5BEA0638668CCA0802EC132D70A9C172DA8B 87260~|~1~|~2~|~02/S<2~|~ROS-US-50 24.130 to 27.290 Resurfacing ProjectUrban Paving Sections 24.13 - 25.12 & 25.21 - 25.25On US50, begin @ it's intersection with SR159, head E on Bridge St, turn SE onto Eastern Ave. and terminate @ US35. 3.16 miles Loop detectors are part of this portion. 80% Fed/20% local match~|~05 - 4R Maintenance - Resurfacing~|~3D2576F07FD4C5EB839A40821DE8249679EF1B61 87260~|~1~|~3~|~03/STR~|~ROS US50 24.13 Brdg/Eastern Brdg Rehab on 7102224 ROS US50 27.14 Intersect: Us Route 3580/20 Split~|~05 - 4R Maintenance - Resurfacing~|~55913F2F8C1DA50B8D334FD3403B75B683CED4B4 87260~|~1~|~4~|~04/S<2~|~ROS-US-50 24.130 to 27.290 Resurfacing ProjectUrban Area Section 25.12 - 25.21 & 25.25 - 26.7580/20 split~|~05 - 4R Maintenance - Resurfacing~|~5901B4F0775A8411F2634E35E9974507458AD187 87260~|~1~|~6~|~06/NHS~|~Ramp F on US35~|~05 - 4R Maintenance - Resurfacing~|~5C489EE645C58424C3EBA1DF89186CA14D4181FC 87260~|~1~|~1~|~01/STR~|~ROS-US-50 24.130 to 27.290 Resurfacing ProjectRural Section 26.75 - 27.29On US50, begin @ it's intersection with SR159, head E on Bridge St, turn SE onto Eastern Ave. and terminate @ US35. 3.16 miles This includes the single lane of Ramp H and the two lanes of the west section. 80/20 Split ~|~05 - 4R Maintenance - Resurfacing~|~5FA6EC91A9744D2CB36AFEC923C0A7D26A4CA2F0 87260~|~1~|~7~|~07/SAE/CHI~|~The section of US50 where this portion of the project is location is within the limits of the city of Chillicothe. Of the three intersections only two of them currently have pedestrian equipment, one with two sets of ped heads to cross US50 and the other with one. The intersection at Eastern Avenue does not have any pedestrian equipment at all so in a way it?s a replacement as well as an upgrade. The safety component on 5th street and 7th street relates to the location of an elementary school in on the east side of US50 between 5th and 7th and the installation of loop detection at the side streets. Access to the elementary school is by way of 5th street approximately 150 feet east of the intersection with US50. During school hours children cross US 50 at these intersections to reach the facility. Currently, the signals on this section are pre-timed and pedestrians will get a green on the side street on a regular interval. Once loop detection is installed and the signals are actuated pedestrians will wait until a vehicle happens to be on the side street as well. Pedestrian push buttons and signals will help to reduce the tendency of pedestrians becoming impatient and crossing without the signal.~|~05 - 4R Maintenance - Resurfacing~|~8E7C83B349EFCAA1B2581666BE1E3399DFDC2F3E 107536~|~1~|~2~|~02/S<2~|~Resurfacing US 36~|~05 - 4R Maintenance - Resurfacing~|~158A0FF373EFBD577F5FB34971376A526C753ABA 107536~|~1~|~1~|~01/NHS~|~Resurfacing TUS-250~|~05 - 4R Maintenance - Resurfacing~|~68F1A726D76810220A339AA8DB465544666009DA 76764~|~1~|~1~|~01/IMS~|~Major rehabilitation and widening along IR 70~|~03 - Reconstruction - Added Capacity~|~60B329684BD712902DDCDB8903F711246D789901 107980~|~1~|~1~|~01/S>2~|~Urban Paving resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A1DEA5EA2F6C7CDEE36723384A7E3A16DF4DD2D5 107980~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. ~|~05 - 4R Maintenance - Resurfacing~|~3EB869D2FFA3097E93D07DC5A89346246CF084C8 95750~|~1~|~1~|~01/STR~|~LUC-64 from SLM 6.36 to SLM 8.91~|~05 - 4R Maintenance - Resurfacing~|~9D45BD65C654B02866B44306405E6C61BB1EB611 95750~|~1~|~2~|~02/NHS~|~Seal deck US24 bridge SFN 4802489~|~13 - Bridge Rehabilitation~|~53D890D061DAADB00A374703159F661F0A7E3101 95750~|~1~|~3~|~03/S>2~|~SR-64 from SLM 2.68 to 3.61 and then from SLM 3.93 to 6.36~|~05 - 4R Maintenance - Resurfacing~|~08D0B0FA0827A1F6EFD5A3E7DD7EF3A30234129E 95367~|~1~|~1~|~01/NFP~|~Removal of sfn#5000785, MAH-SR11-15.34, Austintown Township, Mahoning County, Ohio.~|~13 - Bridge Rehabilitation~|~483F897527ED66075756D1FD0435D77A590EE0B2 122295~|~1~|~1~|~01/NHS~|~Plan split for replacement of the bridge deck and miscellaneous repair items~|~13 - Bridge Rehabilitation~|~8CEE83A6351A31757AF6B6405CBC0531E9A56C42 95457~|~1~|~2~|~02/S<2~|~District Preservation Pavement Funds - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Gue-USR 22-02.31 to 06.04; 2) Gue-USR 22-6.19 to 6.98; 3) Gue-SR 723-0.07 to 0.85~|~05 - 4R Maintenance - Resurfacing~|~16A492B7EB5F3FBD3985F43802524B85088D4DCB 95457~|~1~|~3~|~03/S<2/CAMB~|~District Preservation Urban Paving 4PF7 (80%Federal)/4BG7 (20% Local Match) - No CAP - resurfacing on Gue-USR 22 -06.04 to 06.19 and Gue-USR 22-06.98 to 07.36~|~05 - 4R Maintenance - Resurfacing~|~4FEDD16B91C81DF10F384F51895A5E6FDD64F4C8 95457~|~1~|~5~|~05/S<2~|~District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of traffic signal at US 22/SR 723 intersection.~|~21 - Safety~|~1C83DC3BEDB39AA0E5E26F4D55CB78C350249BDE 95457~|~1~|~4~|~04/S<2/CAMB~|~City of Cambridge Local Funding - 4BG7 (100% Local) - No CAP - For Curb Ramp at Dewey Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~03AF13F516FCDE8CF3AC9E790CB1F1C74757EBE6 95457~|~1~|~1~|~01/STR~|~District Preservation Pavement Funds - 7BPB (100% Bond) or 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comment - Resurfacing on 1) Gue-USR 22-00.00 to 02.31; 2)Mus-US 22-27.64 to 27.73~|~05 - 4R Maintenance - Resurfacing~|~F0077E31BECD9E846E2D0DB8C8A8996D5A61FA67 121575~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~CAAA00682F4360B8FBB09FF70B9E79AD51F59ECC 104841~|~1~|~1~|~01/IMS~|~Lighting Maintenance~|~21 - Safety~|~F3FBE750E5D50F3890C65042682BCDE05F79BE43 104841~|~1~|~2~|~02/NHS~|~Replacement of Wooden Pole and the ground mounted control center.~|~21 - Safety~|~78086C93127352EB40894414490E091F2CE8B76B 104841~|~1~|~3~|~03/S<2~|~Installation of Base and electric meter for the stop light at RIC- SR- 0314 and West Forth Street.~|~21 - Safety~|~4C033ECB6378EDE80746DC61D291A826773D8359 98678~|~1~|~1~|~01/SAF~|~Place, Replace & Reconstruct guardrail with associated activities on various Mercer county roadways.~|~21 - Safety~|~BAFBB845093AF8505A1CCA09F39588773BF898A8 97650~|~1~|~1~|~01/BRF~|~SFN 3560023~|~10 - Bridge Replacement~|~5C7246AF25FCFD60320F41737F7AB23F3DA5929B 114544~|~1~|~1~|~01/IMS~|~FRA-270 resurfacing items and all other miscellaneous work~|~05 - 4R Maintenance - Resurfacing~|~11E2DBE16418AE646E1EBCA45D1A6A7E18706AB2 117460~|~1~|~1~|~01/ENH~|~Rectangular Rapid Flashing Beacons and Lighting along Long St/Ashville Pike ~|~28 - Facilities for Pedestrians & Bicycles~|~E159AAE726BEA436FAFEEFD6476B8964C5435F97 109838~|~1~|~1~|~01/NHS~|~JAC 32 0.00-6.4~|~05 - 4R Maintenance - Resurfacing~|~7137F7FA7B5A2F72181FA36AE57437CDF63985ED 109838~|~1~|~2~|~02/SAE~|~Recessed-Wet Reflective Pavement Markings.~|~21 - Safety~|~9015C505018D709F93E29257BEA5332D7D8AF43D 109838~|~1~|~3~|~03/NFP~|~Retro fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~2DF9C32D497FD374D2464072AA627595301841A8 112734~|~1~|~1~|~01/STR~|~Overlay and abutment repair to MRW-19-2.57 and MRW-61-25.13~|~13 - Bridge Rehabilitation~|~68FB312895E2BA59E4ED80BCC49FBDB0A4B49FF6 113195~|~1~|~1~|~01/NFP~|~2021 OPERATIONS CHIP SEAL - SUMMER 2020~|~05 - 4R Maintenance - Resurfacing~|~3AD77A0F60B5EBF988D775922ECE433CA547EBD5 116039~|~1~|~1~|~01/STR~|~Work on SR 18 in Defiance County outside of the Defiance Urban Area. ~|~05 - 4R Maintenance - Resurfacing~|~C5B43F4B2ABA06920D63E00284F70F6FEBC2AFA3 116039~|~1~|~2~|~02/S5K~|~Work on SR 18 in Defiance County inside the Defiance Urban Area but outside of the Defiance Urban Area. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~E10211B4E42EBD71D43BB7D0595FD4B84E902246 91419~|~1~|~1~|~01/IMS~|~plan split for roadway/pavement work:HAM-74: SLM 3.54 to 7.05HAM-275: SLM 3.97-7.61~|~99 - State Preventative Maintenance~|~E4ED36941CB9CBFD68DA36FF111A4A32E9E0BA60 91419~|~1~|~3~|~03/SAF~|~Increased friction surface course on Ramps E and F~|~21 - Safety~|~419165661E8FA308F06768C8FCDDD27AC93D2AE7 91419~|~1~|~2~|~02/IMS~|~This funding split is for all bridge work including expansion joint/backwall repairs.~|~13 - Bridge Rehabilitation~|~5EA4075ECBC0032F35702D58EA26D2577D3852A6 121830~|~1~|~1~|~01/MPO~|~installation of EV Charging Station at Anderson Center~|~~|~70C0AE6F406B125F5988CDF702663F39EB9431AF 94472~|~1~|~1~|~01/STR~|~Various routes district wide.~|~21 - Safety~|~8FC37F850FD9CD4EA0801DF37B989C49FC32E1B1 93369~|~1~|~1~|~01/ERD/Port~|~Phase 2 of the Ferry Terminal Building in Port Clinton.~|~26 - Ferry Boats~|~E5F534AE541FDD74D8BEA2AD83F6C1988D7E46D1 109321~|~1~|~1~|~01/S<2/NEWA~|~Replacement of SFN 4560078, Lic-CR 804-01.73 carrying Church Street over Raccoon Creek in the City of Newark.~|~10 - Bridge Replacement~|~F971BFAB9C6E091214A3F6DBD050538389E30EB6 8941~|~1~|~1~|~01/NHS~|~7401418 SEN US23 4.88 Intersect: Wolf Creek Branch~|~04 - Reconstruction - No Added Capacity~|~9CBA78061F647FB4DEDD4C5F9113037D0913634D 104014~|~1~|~1~|~01/SAE~|~Installation of Raised Pavement Markers (RPMs) on various county roads in Preble County.~|~21 - Safety~|~24B96E8485469CDE45F19E08BCF17D5B0E81F8C9 97778~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 2.99. Type A emergency project. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~853BBC250642AE3C214629DA8390E4D303DCC7F8 109904~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 513 11.08. Rural other federal aid funded 100% Federal ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8A73D0AEE133A62E6FFD48D635D3CFD79204CD03 102963~|~1~|~1~|~01/STR~|~Chip seal on rural routes: SHE SR 66 SLM 0.00 to 6.42~|~05 - 4R Maintenance - Resurfacing~|~E6B4BA269742855F57E7AC98DBC0D7027E8B0336 102963~|~1~|~2~|~02/NFA~|~Chip seal on Non-Federal Aid Route: MIA SR 55 SLM 0.00 to 2.90~|~05 - 4R Maintenance - Resurfacing~|~215CA65EB5B1F2FACDAB6D52EF5098B355DE69CD 110459~|~1~|~1~|~01/SAE~|~Improve the horizontal alignment on eastbound SR-122 at the intersection of Breiel Boulevard while also providing an eastbound right turn lane. Install distance plaque on existing mast arm west of the intersection. Evaluate signal timing to determine if providing protected-only left turn movements is feasible.~|~21 - Safety~|~F81DEC331DAF4EAEEF0C23818AFA2161EF20E146 110459~|~1~|~2~|~02/NHS~|~Plan Split for the retroactive change order for fuel price adjustment.~|~21 - Safety~|~E39B4B65A4F8E40663F5DCB95CB8FE3938944161 89477~|~1~|~1~|~01/S<2/GRAN~|~"01/S<2/PV/GRAN" - CAP $779,990.00 LCATS - 4TA7 (80% Federal) / 4BG7 (20% Local) - Resurfacing of CR539 within the Village of Granville utilizing LCATS funding.~|~05 - 4R Maintenance - Resurfacing~|~6AE60C3F4201AD34ED76B0B30FF6B31BC81C09A5 104659~|~1~|~1~|~01/MPO~|~Resurfacing Fifth Ave from Federal Street to US 422 in the City of Youngstown.~|~~|~C6034ACB8AFC76E44A2640F767CEA1CA18335AA5 104659~|~1~|~2~|~02/ENH~|~Sidewalk and Lighting enhancements along 5th Ave in the City of Youngstown.~|~~|~F295A351F172D91FB31B926BBF55A9E089AE7A25 100339~|~1~|~1~|~01/NHS~|~LUC-SR2-2.23 to 2.66 LUC-SR2-3.38 to 4.50~|~05 - 4R Maintenance - Resurfacing~|~7DB018106FC67BEC9DDA3C60E19E624196AC5BF5 100339~|~1~|~2~|~02/S>2~|~US-20A from SLM 0.30 to 2.23~|~05 - 4R Maintenance - Resurfacing~|~7DA4562DDDC3C06BB64EE2982F9836A268E04C49 124669~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~21 - Safety~|~23A9997BAF8417325A1BAE6F3025A22A51EFD0CB 104895~|~1~|~1~|~01/STR~|~Culvert Liner project on GAL 218 6.47. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~6C3147245EFCA9A6CD9D94AFAF04BE49D8A4F154 91763~|~1~|~1~|~01/STR~|~Rehabilitate Bridge Size Culvert CLE-133-1243 (sfn 1303309) by lining with a sprayed-in-place liner.~|~13 - Bridge Rehabilitation~|~5BC73E972BA164A04EB5217CC4A05D656F3B85ED 100213~|~1~|~1~|~01/S>2~|~Widen Stringtown Rd~|~04 - Reconstruction - No Added Capacity~|~00AD2DB7BDC31CCC420297E555AD31577B5B35C7 113769~|~1~|~1~|~01/SAF~|~Convert US23/Hull Drive intersection to left-in/right-out~|~21 - Safety~|~2223265B3E96C85FE944A123CE3D1E7B3AF6E4F1 113769~|~1~|~2~|~02/NHS~|~Addition of northbound right-turn lane (100% local).~|~04 - Reconstruction - No Added Capacity~|~BE3E0BB1F2326395B429631FA1347CF37AE0E0BA 109341~|~1~|~1~|~01/STR~|~GAP project in FY2019 to resurface a section of US 127 in Preble County from the Village of West Manchester to the Darke County line.~|~05 - 4R Maintenance - Resurfacing~|~76279F56A005CD07D3F365CA32EF66E518ACB230 124082~|~1~|~1~|~01/MPO/STPK~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5C6606BDDF8B0A8A6301F9BB63A35591F49404A9 113125~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment~|~21 - Safety~|~99C1E49DD714E4DC4A49DFC9E656BC177575552C 120120~|~1~|~1~|~01/NFA~|~Created for TID involvement~|~44 - Other~|~A4DBFA3597403D754885A1FBC6ED56D9F13F3064 97308~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation.~|~15 - Preliminary Engineering~|~11D47CA756BDC3809A6E9475B94789F7B462D429 96881~|~1~|~1~|~01/NFP~|~Pavement repair and resurfacing~|~44 - Other~|~7530D90A5CA6BD2C3610F9800DF965DAF3CDE50D 107706~|~1~|~1~|~01/STR~|~Resurfacing on SR 115 and SR 613 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~F75B106BEBEE8965AF8489E3464AC1007EB80326 119740~|~1~|~1~|~01/NFA~|~Creating Plan Split for TED Involvement~|~~|~046EEC2F859DA97343EC0C638445690B53D68DA7 108276~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 144 5.15-5.19. 80% Federal ER and 20% State ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~69D9EC00FDF7C02F87265F2B99AB5C48727BCD89 97764~|~1~|~1~|~01/STR~|~SFN 550096, MIA-48-0760 over Stillwater River remove LMC overlay and replace with SDC overlay using hydrodemolition. Refurbish abutment bearings, patch abutments & piers, replace expansion joints, paint ends of beams including end frames and bearings. Seal concrete surfaces.SFN 5501563, MIA-55-15.32 - encase piers~|~13 - Bridge Rehabilitation~|~FC83F2ABFE7F5E9B823CBEB447EC67AE293D27E3 109957~|~1~|~1~|~01/SAF~|~CLI CR 16 7.65-8.75 realign both the horizontal and vertical curve as well as widen pavement and berms.~|~21 - Safety~|~3B303FD3F3F93A24FCBB0729B80AECE30AE09A29 110454~|~1~|~1~|~01/NHS~|~Resurfacing US 22~|~05 - 4R Maintenance - Resurfacing~|~B2235F4F2D2BE5F51251CE148DAF2A70FE342149 112575~|~1~|~1~|~01/BRO~|~Rehabilitate culvert type bridge by field paving the invert.~|~10 - Bridge Replacement~|~79FA356006F28F26B6C5ABEFC4C8A56F3F7DDDF9 98600~|~1~|~2~|~02/BRO~|~Split for work on SR-44 over Kellogg Creek~|~13 - Bridge Rehabilitation~|~566F78FC49413489F14D06F32BD167DD4964D1A5 98600~|~1~|~1~|~01/IMS~|~Plan split for work on Morley and Ford over IR-90 and SR-17 over IR-480.~|~13 - Bridge Rehabilitation~|~D5458A034E82728A747EF315601B682E68680521 112646~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~4800142A5F3B7C4170505CF2FB51A76402721974 92965~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge replacement~|~10 - Bridge Replacement~|~263CB2EF7E9F53240361FBC8A2D1F66F98CDA6F6 107815~|~1~|~1~|~01/S<2~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~11243DC0A5F0D7DF6464D9C45A8D23A81B0D994D 100403~|~1~|~1~|~01/STR~|~Structure replacement project. GAL 141 4.52, SFN 2701545. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~E28C5C76CF99E48A40B6F45B323F51D25D185325 100403~|~1~|~2~|~02/NFA~|~Bridge replacement project. GAL 790 3.76 (SFN 2704840). Not on any federal aid system funded 100% state.~|~10 - Bridge Replacement~|~0C7AA07FD5010A1646ED824BB3EF2A7C93728A67 97571~|~1~|~1~|~01/STR~|~Resurfacing of CAR-43 and CAR-164 including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~2EA123D95E473FE672825BBE1851D2B945DFB76E 116061~|~1~|~2~|~02/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~0F7D94AA43F13A87EDF6129C3596F4D07B8E9BD6 116061~|~1~|~1~|~01/S5K~|~Resurface with fine graded polymer modified asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~8D05E197C4E6CBE989D55E11DBFFF3D120EEA01D 96369~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - District Preservation 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge replacement on 4502310 LIC-40-19.64 Intersect: Over Spring Run; Not BR Eligible: Length=10 SD/FO(0) SR=95.7~|~10 - Bridge Replacement~|~76477AE84825C4362DC5E29E4C22827DDE7D95F9 98011~|~1~|~1~|~01/STR~|~Resurfacing and preventative maintenance work in rural segments.~|~05 - 4R Maintenance - Resurfacing~|~106422A751CA645DC5EDA6C0521F69431561E1E0 98011~|~1~|~2~|~02/S>2~|~Resurfacing and work in rural >200K segments.~|~05 - 4R Maintenance - Resurfacing~|~22F5989FDD951E09E24358E44126BE73447E8CCE 88920~|~1~|~1~|~01/BRO~|~Replace existing three cell concrete structure (JEF-213-0467, SFN 4103122) with a new steel beam or prestressed concrete I-beam single span structure.~|~10 - Bridge Replacement~|~B65C8938935159A10D808E9CB78DA6C54D9F9C40 117731~|~1~|~1~|~01/NFP~|~Resurface French Creek Picnic Area.~|~04 - Reconstruction - No Added Capacity~|~4D792902615BFD2FC69C48837487D228D36BDED1 100788~|~1~|~1~|~01/STR~|~HEN-108 and HEN-109~|~05 - 4R Maintenance - Resurfacing~|~6F8405B4207A412E21DA5F1771AD90CE9FEB20D9 100788~|~1~|~2~|~02/STR~|~SFN 3503186~|~13 - Bridge Rehabilitation~|~CF250294379240F25400DF8CC8516082D96DF94F 107235~|~1~|~1~|~01/CMQ~|~Signal upgrade along various routes within the City of Warren.~|~21 - Safety~|~37657F13C172BFD7DEF87DB36DD6A265929A245C 107235~|~1~|~2~|~02/SAF~|~Replacing 12 school zone 20 MPH flasher units, replace 74 pedestrian signals, install pedestrian signals at 3 signalized locations and 1 HAWK signal and install high visibility thermoplastic crosswalk markings where needed.~|~21 - Safety~|~C07750B042A576354393C0F5D552DCF3E985D069 122093~|~1~|~1~|~01/NFA/CROO~|~Industrial Drive sidewalk improvement project in the Village of Crooksville / Perry County.~|~28 - Facilities for Pedestrians & Bicycles~|~2459275882406C8C3E16BA437A012FF3084B2BFD 125358~|~1~|~1~|~01/STR~|~Smoothseal.~|~05 - 4R Maintenance - Resurfacing~|~6A467D2A0DF96CE5F06631A271228D0AF1454927 125358~|~1~|~2~|~02/BRO~|~Bridge maintenance on resurfacing projects~|~05 - 4R Maintenance - Resurfacing~|~BD28EB99CD0C1154A4173747D59EE00A2B6CBDDB 102413~|~1~|~1~|~01/NHS~|~STA SR 153 from 7.47 to 7.80~|~05 - 4R Maintenance - Resurfacing~|~B3967A8DED92A85D5958B1A6B855287B45C4C6AE 102413~|~1~|~2~|~02/S>2~|~STA SR 153 from 7.80 to 8.06 STA SR 172 from 19.51 to 20.36~|~05 - 4R Maintenance - Resurfacing~|~D860BF6F01295F7D9D2A820BAEB8FA393AE3AFB2 102413~|~1~|~3~|~03/STR~|~STA SR 153 from 8.06 to 9.87 STA SR 172 from 20.36 to 25.53~|~05 - 4R Maintenance - Resurfacing~|~528DF30F21CE11C862D07AF91FCD7708DFBFB665 112488~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~CA035082AC1B39D650896784EFB528B99189BFE0 112488~|~1~|~2~|~02/S5K~|~Resurface with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~390E7F6189914EB304E6F156874584D0571507C2 112488~|~1~|~3~|~03/STR~|~Resurface with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~622A2963F4E3635B2FF7F80071D977D282A52D4E 106964~|~1~|~1~|~01/NFA~|~Create an overflow parking lot using grass stone pavers.~|~44 - Other~|~D15B515423C120075D993F699BA5D78CB5E42EE2 116441~|~1~|~1~|~01/NFP~|~Installing Recessed Wet Reflective pavement markings on various routes throughout District 4.~|~~|~ED54FB7804C7479FCB54D69C0A439351FF91D5F4 125725~|~1~|~1~|~01/STR~|~Resurfacing SR 516 from SLM 3.70 to 7.07~|~05 - 4R Maintenance - Resurfacing~|~EAFE561FE17531E58B83DF96D4C13B401D92B073 125725~|~1~|~2~|~02/S5K~|~Resurfacing SR 516 from SLM 7.07 to 7.72~|~05 - 4R Maintenance - Resurfacing~|~1F431DE84597D567B0FE9678EB48412E9005CB8A 94624~|~1~|~1~|~01/NFP~|~Auxilary pavement markings in Portage, Stark, and Summit Counties, Ohio.~|~21 - Safety~|~214E9585549E88D8AB4145D4A6C9860EC961535E 123131~|~1~|~1~|~01/IMS~|~Landscape maintenance along Interstate~|~31 - Landscaping & Other Scenic Beautification~|~E3E2FAB905595FC0D68B0E81BB656D6208A059C9 106309~|~1~|~1~|~01/NHS~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~720EF40775AA10FE1DDFEE87F89FA4B5BC6BED14 101690~|~1~|~1~|~01/ENH/SOME~|~"01/ENH/OT/SOME" Village of Somerset TA approved project for sidewalks. Maximum TA funds approved at 95% = $682,240~|~28 - Facilities for Pedestrians & Bicycles~|~80769C0A6EDDD84241B79436D9565A4F38C19328 93673~|~1~|~1~|~01/STR~|~District Wide RPMs~|~21 - Safety~|~E4730DF13F2499C60CC91444F2C72AD2A4EA1076 103673~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 13.82. DSR MEG-003.~|~~|~8F1D71AB877273A415EE08CE25F8748A53243741 93000~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with associated work on Per-SR 668-11.00 to 16.88~|~05 - 4R Maintenance - Resurfacing~|~07533E750B8D47C7C4C48E4642603E512FF4476A 93000~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing and associated repairs on: 1) Lic-SR 668-00.00 to 02.73; 2) Per-SR 668-17.64 to 26.35;~|~05 - 4R Maintenance - Resurfacing~|~B7D7061FEDC54742AF9D74138F5589101646554C 105528~|~1~|~1~|~01/STR~|~All work on SR 637 in Paulding County. Work on SR 18 in Defiance County from SR 2 in Hicksville at 3.52 to the Defiance Urban Area boundary at TR 149 (Ashpacher Road) at 21.22. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~A6A6B4EA62D66DB93F0E0F272A536FE75BD515C7 105528~|~1~|~2~|~02/S<2~|~Work on SR 18 in Defiance County from the Defiance Urban Area boundary at TR 149 (Ashpacher Road) at 21.22 to SR 15 at 22.30. All funds are from the District Preservation Program budget. No local funds. Although the work is inside the Defiance Urban Area, it is outside of the City of Defiance.~|~05 - 4R Maintenance - Resurfacing~|~E2204F1A3A738EE94D7491E97D840911632E4153 107755~|~1~|~1~|~01/S5K~|~Work on signals inside the Findlay Urban Area and inside the Defiance Urban Area. 100% federal funds provided by the District. No local funds.~|~21 - Safety~|~0D6A51FC44F7031F11A7E15E69ECF804E04B722B 107755~|~1~|~2~|~02/S50~|~Work on a signal inside the Lima Urbanized Area. 100% federal funds provided by the District. No local funds.~|~21 - Safety~|~C57D8730E434F0C96EAD6F38C878495A104A0B1B 111235~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~595A58B231B6470222E01613796274F87698AD30 102548~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on: Ham 125 SLM 4.04 to 7.52~|~05 - 4R Maintenance - Resurfacing~|~8D8A727474A85710715B396DF2EC148D8CB5835A 124133~|~1~|~1~|~01/SAE~|~100% safety funded as part of target speed pilot program ~|~21 - Safety~|~4A6BA3A0ADDE29EE7686C75CB3891288101C65A8 123701~|~1~|~1~|~01/IMS~|~Widening of Dry Fork Road to provide a right turn lane from NB to the EB I-74 on ramp. Also widening the EB I-74 exit ramp to provide a right turn lane to SB Dry Fork Road.~|~04 - Reconstruction - No Added Capacity~|~91706C4F75485207020B7741C1BA52D47FCC4056 102356~|~1~|~3~|~03/STR~|~Microsurfacing to ATB SR 45 from 24.60 to 26.43, ATB SR 167 from 0.00 to 2.17, ATB SR 193 from 22.54 to 24.12.~|~05 - 4R Maintenance - Resurfacing~|~799105ADFC7CA7BE922DA2FF57831058EEA8B341 102356~|~1~|~1~|~01/NHS~|~Double Microsurfacing to ATB US 20 from 3.87 to 6.35. Microsurfacing to ATB US 20 from 14.78 to 21.60.~|~05 - 4R Maintenance - Resurfacing~|~06759E31046FDF09DDDE5404EAC02633B52B3D05 102356~|~1~|~2~|~02/S<2~|~Microsurfacing to ATB SR 45 from 24.11 to 24.60 and 26.43 to 26.45, ATB SR 84 from 19.75 to 20.28, ATB SR 193 from 27.28 to 27.71.~|~05 - 4R Maintenance - Resurfacing~|~B60FC35C978757F61EA19283A5EAEBA8A168406D 119170~|~1~|~1~|~01/IMS~|~Two-lane resurfacing project using an asphalt overlay treatment. NOB 77 11.22-18.92.~|~05 - 4R Maintenance - Resurfacing~|~015CCB912531125F9B60F3CBD0AE56CA4A706669 125724~|~1~|~1~|~01/NFP~|~Guardrail work throughout District 11~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F1181FCAC1E606978A5920A506C395179B391C3D 123786~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~8FA1D6DE5F7D19549DC692610ED9E6A94FF41440 123786~|~1~|~2~|~02/NHS~|~bridge plan split.~|~13 - Bridge Rehabilitation~|~BB036D933DC5BB3F5E0F07DDFD92D74BFF0FDD8A 98476~|~1~|~1~|~01/STR~|~Funds from the District Preservation Program. 80% Federal rural STP funds SAC 4PF7 and 20% state funds SAC 4PS7.~|~05 - 4R Maintenance - Resurfacing~|~40FF7D4711762A3FAC9C4D223BC62A331F881143 82370~|~1~|~1~|~01/NHS~|~Improve capacity and safety on a portion of SR 32 by adding an interchange and eliminating several at grade intersections and drives. The new interchange will grade separate Bach-Buxton and SR 32 and will include improvements on Bach-Buxton between Aicholtz Rd. and Old SR 74. Evaluate improvements to Aicholtz Rd. from Eastgate Blvd. to Bach-Buxton. Evaluate improvements to Old SR 74 from Eastgate Blvd. to Bach-Buxton. Evaluate improvements to Old SR 74 and Heitman Lane between Bach-Buxton and Stonlick Olive Branch Rd.~|~03 - Reconstruction - Added Capacity~|~C1FB021310D27BDC96665EB30A198E54AEA06DD6 118755~|~1~|~1~|~01/STR~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~3417B55F117BD941F61CC49DB3E5FC7038AF03F3 118755~|~1~|~2~|~02/NFA~|~added plan split for NFA~|~05 - 4R Maintenance - Resurfacing~|~2FB9A45EAC0142F415189384ACABCAB2C26C75DE 118755~|~1~|~3~|~03/S5K~|~added STP plan split.~|~05 - 4R Maintenance - Resurfacing~|~4D2B29BE92D20FD507A7DA892774155836D42974 118860~|~1~|~1~|~01/STR~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~2F07A0861B667401F433A24114B821B55B3014F1 102757~|~1~|~1~|~01/NHS~|~This plan split is for bridge sealing on NHS route bridges.~|~47 - Bridge Preventive Maintenance~|~B355B5352C4C6D48AAD81E60C88A44131E2201EC 102757~|~1~|~2~|~02/IMS~|~This plan split is for bridge sealing on Interstate route bridges.~|~47 - Bridge Preventive Maintenance~|~CA710DEA4E21AD1B7108DAF3249C2EC85C64B048 102757~|~1~|~3~|~03/S>2~|~This plan split is for bridge sealing on the large urban route bridge.~|~47 - Bridge Preventive Maintenance~|~7ADA3169F39EDAC29CDA4DB9F0079A38122DB5AD 102924~|~1~|~1~|~01/IMS~|~I-75, SR51, and US24 bridges.~|~47 - Bridge Preventive Maintenance~|~975806EC80434724E0F79130015BF6E736564DE4 90540~|~1~|~1~|~01/STR~|~Replace deteriorated and distorted culvert type bridge with minimal roadwork on SFN 5400066 MER SR 29 0.00 ( bridge length is not long enough to be federally funded.)~|~13 - Bridge Rehabilitation~|~BD3A7CF275C5B3BD50C3DF5D733814107504A798 119318~|~1~|~1~|~01/MPO/GCEO~|~Construction of a shared use path along Dayton Xenia Road from Ankeney Road to School East Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~ECCF7135CFD16BC18C45A937B26B75C58CC577A4 91160~|~1~|~1~|~01/STR~|~BRO US52 3.58 OH11-02Slide RepairOn US52, begin project 3.58 miles east of the Clermont County Line. Project Description: It is proposed, by Federal Declaration # OH11-02, to repair a rock slide along the Ohio River. 80/20 split01/STR/OT/State~|~44 - Other~|~39ADADFC922EC0F201ACDA5E87F145CB559F435A 114210~|~1~|~1~|~01/IMS~|~Friction Treatment on two interchanges on I-270. FRA 270/33/161 - Interchange ID 29800 and FRA-270/70 - Interchange ID 25900~|~21 - Safety~|~FC6EB7A8610148D671920090788B9ED82448D3AC 80844~|~1~|~1~|~01/NHS~|~4 bridges (NHS) Painting: HOC-93-12.43 SFN 3702138, HOC-328-11.46 SFN 3703908, MEG-7-7.61 (L) SFN 5300150, and MEG-7-7.61 (R) SFN 5300169. NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~1C1CCF42D5308556617885D2CBEB09DBDB9E4956 80844~|~1~|~2~|~02/STR~|~2 bridges (Rural) Painting: VIN-327-10.18 SFN 8202281 and VIN-677-3.47 SFN 8203393. Rural other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~5339311F399060D1A8BF6DCC19D7D3E6A8CDBD67 90933~|~1~|~1~|~01/NFA~|~Signage for school zone~|~28 - Facilities for Pedestrians & Bicycles~|~B3FA29E896E964170A573C5D4F23C53DB3B7F713 106207~|~1~|~1~|~01/IMS~|~FY 2022 Block PID for drainage system maintenance/repair.~|~44 - Other~|~4DECBE830691880BADA8C7DA1414B6926C34CDA7 122892~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~395FBA39B8C01F866F0771C5650C1779A3F1A5EE 91843~|~2~|~2~|~02/STR~|~General System asphalt resurfacing on HAS-646-0.00 to 6.53 and 15.40 to 16.62.; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~053942E37B13E217517EFEE756B580ED85DD8118 91843~|~1~|~1~|~01/NFA~|~General System asphalt resurfacing of HAS-646-6.58 to 10.44 and 16.62 to 20.32.; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~FFA7AE9348D7EE855D0D89D1A000526272B2F89C 95586~|~1~|~2~|~02/NHS~|~HUR US 0224 15.82-NHS~|~13 - Bridge Rehabilitation~|~CED204C488471C6DF44372447487FA4B402CDDCE 95586~|~1~|~3~|~03/S<2~|~HUR SR 0099 03.68~|~13 - Bridge Rehabilitation~|~FB5A1F2FA284D4F51975B1045C629CD453D2148D 95586~|~1~|~1~|~01/STR~|~Remaining locations in the project that are not in split 2 or 3.~|~13 - Bridge Rehabilitation~|~E30E5BBC857E803536CAA738FC8630206ECDEEE9 95586~|~1~|~4~|~04/NFA~|~CRA-SR-100-03.490 SFN 1702858 Reactive MaintenanceExp jt repair/repl (048)Minor RehabilitationPile encasement (084)Pier repl/repair (085)~|~13 - Bridge Rehabilitation~|~09BA2C722D7FA64FE8C996D979365A01A89396F2 104145~|~1~|~1~|~01/ENH/DUA~|~Work in the Defiance Urban area funded by the Transportation Alternatives Program. Funding is 95% federal using Toll Credit. Includes work both inside and outside of the City of Defiance. The Defiance County Engineers Office will provide the match and will collect the necessary funds from the City of Defiance. Work from the beginning of the project at 0.00 to the Defiance Urban Area boundary at 2.47.~|~28 - Facilities for Pedestrians & Bicycles~|~F50A4F2606FC7A28EA7BA20681B5F8976B962810 104145~|~1~|~2~|~02/ENH~|~Work outside of the Defiance Urban Area funded by the Transportation Alternatives Program. Funding is 95% federal using Toll Credit. The Defiance County Engineer will provide the non-federal funds. Work from the Defiance Urban Area boundary at 2.47 until the end of the project.~|~28 - Facilities for Pedestrians & Bicycles~|~08CBF2188E94DDA46B02CFB4DE55611F9AF09534 118636~|~1~|~1~|~01/SAF~|~Replace existing poor condition guardrail along SR 60 under SR 2 with concrete median barrier. This would include removing existing Type A guardrail end treatments. ~|~21 - Safety~|~545BFA71C37CC77D3DC75FFE5425BE8ADC4420F4 98290~|~1~|~2~|~02/S<2~|~Extrusheet sign replacement project. ATH 682 0.20-0.39 and WAS 60 4.45-5.12. Urban other federal aid funded 80 federal/20 state.~|~21 - Safety~|~60D9C3AEBF31B3342F5F961EECF399C512610351 98290~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project. ATH 33 14.02-18.77, ATH 50 11.00-11.99, 14.14-14.48, 32.72-33.54 and MEG 33 11.12-11.34. NHS route funded 80 federal/20 state.~|~21 - Safety~|~D157992C096FED848A7425DA11873C5A47F01B69 122898~|~1~|~1~|~01/ENH/TRCE~|~Install new sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~DF1DFFA7AD9E184A2C8391B413B728BB2020C50B 115975~|~1~|~1~|~01/IMS~|~District Preservation - 4PS7 (100% State) No CAP - replacement of damaged tower light pole that occurred during crash.~|~21 - Safety~|~6AB3F3329376DFCBA437CB922763BAC03017264B 123992~|~1~|~1~|~01/SAF~|~Guardrail installation project on HOC CR 36 0.00-8.018.~|~21 - Safety~|~6EB7C8E7ED464D5E21EB1C8874479692FF12AC0B 98711~|~1~|~1~|~01/NFP~|~Repair of embankment slip~|~44 - Other~|~191BCDAA35D8CFA05557DC139FE507C2A223FE40 91691~|~1~|~1~|~01/NHS~|~Replace small culverts WAR-42-1710 and WAR-42-1753~|~44 - Other~|~4726FAFE3C7BC3A99D55071FE03DEAB1E2D64C77 123939~|~1~|~1~|~01/BRF/MACE~|~Deck replacement.~|~13 - Bridge Rehabilitation~|~53FCCFD2CBF7ADE598CADCD2505B6E2208900E52 123827~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~058E5E4CE99931CAF5DD3270E0291902905EDBA9 123827~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~AB89F3E54EE8584AE71114A54FF144B5820C6713 101509~|~1~|~1~|~01/ENH~|~Construction of new sidewalk and curb (where necessary) along the north side of Clay Street from Floyd Street eastward for approximately 1200? to Depot Lane. In addition new sidewalk will be constructed through the Community Park property for approximately 300? from the Spray Park driveway to a designated crossing of Dayton Street at the Tillman Lane Athletic Complex intersection. New sidewalk will be constructed on the south side of Dayton Street for approximately 400? westward to meet existing sidewalk. New lighting and signage will be installed, as well as benches and trash receptacles.~|~28 - Facilities for Pedestrians & Bicycles~|~A9CA6E510A2F6106D0C2806FF1EEF5FE16548473 102504~|~1~|~1~|~01/NFP~|~Replacement/repair of RPM within District 5.~|~21 - Safety~|~A082BE78AF462E899B455B55667C8D0FA4806A30 108263~|~1~|~1~|~01/S<2~|~Slide repair from OH18-01 ER event. DSR BEL-007~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B9A5FE933C0318460206D1686AEEC507F056D298 120300~|~1~|~1~|~01/BRO~|~Clean and Paint structural steel of bridge carrying SR 9 (Overlap w.SR 43) over Town Creek.~|~47 - Bridge Preventive Maintenance~|~ED74E8D2D2102E1A5C0A95EE7CB216DB1C933C70 105793~|~1~|~1~|~01/IMS~|~Plan split for bridge work~|~13 - Bridge Rehabilitation~|~15F0B863918430D1954C27C28A723126E695C0D7 100976~|~1~|~1~|~01/STR~|~DSR# CAR-001~|~04 - Reconstruction - No Added Capacity~|~F71ECF17B6FEFC59DD64D2EEF4B5B1D3161AC24D 98139~|~1~|~1~|~01/STR~|~Replace culverts at SLM 0.489 and 2.319.Replace and relocate culvert under TR 156 (Ghormley Rd.)~|~04 - Reconstruction - No Added Capacity~|~01A6E7685BAE3D925789CFB844414B7AAFADAA8A 98139~|~1~|~2~|~02/STR~|~Widen TR 156 at the intersection with SR 41 except culvert.~|~04 - Reconstruction - No Added Capacity~|~0D75BCA420CCD5EE8B49A362118C3D8BD580FF60 93722~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/PV/CAMB" City of Cambridge Small City funded project for the rehablitation of Oakland Blvd. Small City funds approved at 80/20 with funding cap of $2,028.112.80.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A77AD66442F735270E16B2264C3EB262682BEBEE 122010~|~1~|~1~|~01/S>2~|~Intersection improvement~|~21 - Safety~|~7C6DF7FAA01CE95813E1C7845BD511ACFC5C9F64 90643~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~6D843B758F7C537844D1A3FFC4A311800B16B6A4 106056~|~1~|~1~|~01/NHS~|~Concrete deck overlay. MEG 7 5.80, 7.08 L & R, and 7.61 L & R. NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~520A701B0FC783545137F04DD2958F77B2C0C2FD 92351~|~1~|~1~|~01/NFP~|~100% 4CP7/Maint funds for 1 year guardrail ding and dent~|~21 - Safety~|~DB2876902C76B50DC4D719BAED9F4BC021BE6B70 111404~|~1~|~3~|~03/IMS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~5A972CD07C389CA8E7A607BF777571AB1D1CE8B6 111404~|~1~|~2~|~02/IMS~|~Construction of 3rd lane on IR-77 from Ghent Road to Everett Road, in Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~718D6E749D20D6DB70B49BBC4508782BC916D629 111404~|~1~|~1~|~01/IMS~|~Total replacement of existing lanes on IR-77 from Ghent Road to Everett Road, includes culvert replacements, extensions and removals.~|~04 - Reconstruction - No Added Capacity~|~0AB76218981CC9A4B1AC000DEC7CA614447B38EC 111404~|~1~|~4~|~04/NFA~|~Resurfacing new SUM I-77 rest area parking lots.~|~05 - 4R Maintenance - Resurfacing~|~8D4E28D2C850623D8A0E162B424568216EFEAC01 125509~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~5EE624299D483E4AB205E8B9747E0931F5D817C4 125509~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance~|~47 - Bridge Preventive Maintenance~|~B250832F541CDAEF1B13B272ACAC9EFC0CB6F714 125509~|~1~|~3~|~03/STR~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~E5AD467AFEB904F8A73999C3651B42EA457F8B10 106880~|~1~|~1~|~01/ENH~|~Plan Split~|~28 - Facilities for Pedestrians & Bicycles~|~5FA8A6965700AF28E4AB55F5D30E62B6FB9F3C38 108558~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH CR 42 4.48. DSR ATH-011. Rural other federal aid funded 80 federal/20 local ER funds.~|~~|~A47F4A9C2B47870115D689F6861BD44FE739EAA4 81932~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~903F6F73B291E711E95E31BC62A211235F3760D6 109383~|~1~|~1~|~01/NFP~|~Culvert and bridge work in Scioto State Forest.~|~04 - Reconstruction - No Added Capacity~|~BC3B46F4161B3258D8651A8B96E6AD20C734D8BD 126936~|~1~|~1~|~01/S>2~|~Replace conduit at DEL-42-12.63~|~04 - Reconstruction - No Added Capacity~|~DD3D70AF1E7A6D31E30BB87C91B591E644E43A3D 95131~|~1~|~1~|~01/S<2/KNOX~|~"01/S<2/PV/KNOX" - CEAO Funding 4B77 (80% Federal) / LNTP (20% Local Match) - CAP is $1,641,600 federal dollars for CO & CE requiring a 20% Local Match. County resurfacing of: 1) Kno-CR 80-00.00 to 00.72; 2) Kno-CR 80-01.54 to 01.70;~|~05 - 4R Maintenance - Resurfacing~|~3EC277C35B0EFCC336CCC7111F8AADF80668071C 95131~|~1~|~2~|~02/STR/KNOX~|~"02/STR/PV/KNOX" - CEAO Funding 4B77 (80% Federal) / LNTP (20% Local Match) - CAP is $1,641,600 federal dollars for CO & CE requiring a 20% Local Match. County resurfacing of: Kno-CR 6-06.97 to 13.47;~|~05 - 4R Maintenance - Resurfacing~|~61C0F6AF31639904F50EFEA4DBBB1394F425501C 95131~|~1~|~3~|~03/S<2/MTVE~|~"03/S<2/PV/MTVE" - Resurfacing of CR80 within the Corporation Limits of the City of Mount Vernon.~|~05 - 4R Maintenance - Resurfacing~|~DB9739421D1FD136415872996F1DA20506719C72 87244~|~1~|~1~|~01/STR~|~PIK SR124 7.53 - 17.12 Resurfacing ProjectOn SR124, begin 0.02 mile east of CR6 (Lapperell Rd) (SLM 7.53), head east for 9.59 miles and terminate at SR32 (SLM 17.12), it is proposed to resurface the highway with asphalt concrete.Pave Thru Brdgs:6601235 PIK SR124 7.87 Intersect: Shoemaker Hollow Stream6601294 PIK SR124 9.47 Intersect: Trib Of Sunfish Creek6601332 PIK SR124 10.15 Intersect: Tributary Of Sunfish Crk6601359 PIK SR124 11.01 Intersect: Trib Of Sunfish Creek6601456 PIK SR124 14.96 Intersect: Trib Of Sunfish Creek6601464 PIK SR124 15.75 Intersect: Trib Of Sunfish Creek80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~4B1C3B8C6ECD476AC1DD9B341F96F94167E9AE69 87244~|~1~|~2~|~02/STR~|~PIK SR124 7.53 - 17.12 Resurfacing ProjectBrdgs F/Rehab:6601383 PIK SR124 12.9 Intersect: Morgans Fork6601421 PIK SR124 14.71 Intersect: Leeth Creek80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~6A7344FE6CAE9B9233B8CA16143A475859326105 115807~|~1~|~1~|~01/STR/GCEO~|~Guernsey County Engineer's CEAO CSTP Program - 4B77 (80% Federal) / LNTP (20 % Local) - See CAP Comment - Project to resurface portions of Broadhead Road (CR 585) and portions of Birmingham Road (CR 585)~|~04 - Reconstruction - No Added Capacity~|~40767207E29AD6471E7C7C6E79E7079D47F8AF2D 115807~|~1~|~2~|~02/NFA/GCEO~|~Guernsey County Engineer Paving Program - LNTP (100% Local) - See CAP Comments - Resurfacing a portion of Birmingham Road (CR 71).~|~04 - Reconstruction - No Added Capacity~|~D414568C8C81C71CCF16C5AD332EDC6ECBBD8EC9 94187~|~1~|~1~|~01/S>2~|~Project to include several drainage maintenance items along US 50 east of Newtown Road. The improvements include upgrading the north curb inlets at SLM 32.29, 32.41, 32.46 that continually clog, lining the longitudinal CMP storm drains with a sock liner at station SLM 32.41, repairing the catch basin at SLM 32.41, and replacing the culvert at Station 32.96. Drainage between shall be video inspected from Newtown Road to SLM 32.96 by Planning (See Archive 08C1493 for original plans). Other locations may be added.~|~04 - Reconstruction - No Added Capacity~|~964A46A53EAD9BC609353DF7F28D6A4637C74675 94187~|~1~|~2~|~02/S>2~|~Water work to be paid 100% by GCWW.~|~04 - Reconstruction - No Added Capacity~|~42F9526B7468BAA2920B12FE241BA43C1DE5EC72 113242~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work.~|~05 - 4R Maintenance - Resurfacing~|~14DA854D1A57162FA02C5A54B29AB847352C3956 97514~|~1~|~2~|~02/MPO~|~100% City of Wooster items~|~~|~A21793D7E78161FA123AF75D2A769A6372F0D020 97514~|~1~|~1~|~01/MPO~|~Mill & fill 2" w/asphaltic concrete--E. Liberty & Pittsburgh Ave.~|~05 - 4R Maintenance - Resurfacing~|~C7A08DA2D5636B7C25466ED7EFA72BB8FDA5A1C0 93596~|~1~|~1~|~01/NFA~|~Construct Multipurpose/Training structure (building) on D10 HQ campus. Funded 100% state.~|~44 - Other~|~88E00800C7140EC65121343CA51F64EDE760AA1B 105657~|~1~|~1~|~01/STR~|~Replace structures: MRW-19-6.45 over Whetstone CreekMRW-19-6.83 over Snyder Run~|~10 - Bridge Replacement~|~D7E58CD224DBA71D5E960E28A957A5FF3939590B 119239~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~539484A4A6794DCA97E4FED54603EF4FEB577F3F 97350~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~44 - Other~|~3480D60F2634C2B810D5E9E7485D660935358784 123426~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~F4008804D1F0418080A31682BF065E73A7EF630F 93942~|~1~|~1~|~01/NFP~|~This is the district's FY 15 district wide lighting maintenance construction contract using 4CP7 sac.~|~21 - Safety~|~6BFE2F4076B8D51E33872B953C2B725B5BE50146 88813~|~1~|~1~|~01/STR~|~Split includes repalcement of bridge CLI-133-0167 and CLI-133-0702 (both are twin Corrugated Metal Pipes) with new structures. Split includes incidnetal roadway work necessary to replace these structures.~|~10 - Bridge Replacement~|~B53B84A76839D752AFFCE97796F616550281D302 115936~|~1~|~1~|~01/ENH~|~Construction of a multiuse trail along former railroad alignment.~|~~|~54C8E6C6F8D0996C6CD48C9727F3856CAFE9B9CF 97178~|~1~|~1~|~01/SAF~|~Widen the intersection to install left-turn lanes; upgrade the traffic signal; access management where feasible; and improve the turning radius at Limestone and St. Andrews Boulevard~|~21 - Safety~|~E6EDB10AF0E5FFDD97BBDD6957A03D02E903EAFF 97178~|~1~|~2~|~02/SAF~|~Addition of sidewalk along the project.~|~21 - Safety~|~6F5F267EC1EDBB6DDE1B2A5ECB737CD5D47F7596 84201~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2014. Various routes and sections in D-10. Routes include: ATH 78, ATH 550, MRG 78, NOB 78 and WAS 550. Funded 80 federal/20 state.~|~21 - Safety~|~6470BE1771B0E51DC4E5CA691F8E0A1B62C52583 84201~|~1~|~2~|~02/NHS~|~Guardrail upgrade/replacement contract for FY 2014. Various routes and sections in D-10. Route on NHS ATH 500 1.00-2.07. Funded 80 federal/20 state.~|~21 - Safety~|~8BD96137BBB80FC126D0121398CB1AA1ADB848F2 121548~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~F54831C442076ABEBE998DD9B77F70719CD225E1 94378~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds SAC 4PS7.~|~21 - Safety~|~D3EAE925B66CD46BEC381C4BBBA4C975566BB4EC 100175~|~1~|~1~|~01/S<2~|~City of Jackson McCarty Lane MR 98R 0.00-0.70~|~05 - 4R Maintenance - Resurfacing~|~87420423F3F2958278655F9B02BAA3F8F94534F5 100175~|~1~|~2~|~02/S<2~|~City of Jackson McCarty LaneMR 98R SLM 0.70-1.40 East segment Only (Acy Ave to Bridge)CR 98 0.00 -0.08~|~05 - 4R Maintenance - Resurfacing~|~B9EE7E43726631EF45DD2D71412ADAE3AF8F8854 80107~|~1~|~1~|~01/IMS~|~FAY-71: 0.00-9.47 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~05EBFB812308B075188DBF3AA9C57C152DB3EDE4 80107~|~1~|~2~|~02/IMS~|~12 structures (not BR eligible):2401681 FAY IR71 0.29 Intersect: Grassy Branch2401711 FAY IR71 0.29 Intersect: Grassy Branch2401746 FAY CR13 0.49 Intersect: Over Cr 132401770 FAY CR13 0.49 Intersect: Over Cr 132401924 FAY IR71 3.02 Intersect: Rattlesnake Creek2401959 FAY IR71 3.02 Intersect: Rattlesnake Creek2401983 FAY SR435 3.77 Intersect: Over Sr-4352402017 FAY SR435 3.77 Intersect: Over Sr-4352402041 FAY IR71 7.19 Intersect: Sugar Creek2402076 FAY IR71 7.19 Intersect: Sugar Creek2402106 FAY IR71 7.33 Intersect: Over Abandoned Dt&I Rr2402130 FAY IR71 7.33 Intersect: Over Abandoned Dt&I Rr~|~05 - 4R Maintenance - Resurfacing~|~7095CA7978684027D3DCCBD3249CB5DD34E69330 92041~|~1~|~1~|~01/NHS~|~Federal Emergency project Disaster event OH11-02 DSR COL-009 to fix failing culvert.~|~04 - Reconstruction - No Added Capacity~|~757623B79CD5A5F5D8737D22BFD6B562F05C5C2B 81334~|~1~|~1~|~01/NHS~|~Road reconstruction~|~04 - Reconstruction - No Added Capacity~|~70C94E1943C8F0239E72441E463C3209939A12D4 81334~|~1~|~2~|~02/S<2~|~Non-NHS Segments.~|~04 - Reconstruction - No Added Capacity~|~05B7E1080D124910CEAB0B5454C496E38967FDFB 86937~|~1~|~1~|~01/S>2~|~Plan Split for SUM SR 8 20.27 to 21.32~|~05 - 4R Maintenance - Resurfacing~|~BF0A2B2DAFC508CBBDCFA052A8195857C0EC4CB0 92763~|~1~|~2~|~02/S<2~|~Repair of various structures: SFN 5000181 over Cranberry Run, SFN 7804059 over Crab Creek, SFN 5002060 over Sugar Creek, SFN 5003997 over Burgess Run~|~13 - Bridge Rehabilitation~|~8239ACC91CD90DC1F79D8243DD26E2509B93420A 92763~|~1~|~1~|~01/STR~|~Repair of various structures SFN 5003059 over N. Jackson Ditch, SFN 5001242 over MId Fork Little Beaver Creek, SFN 5001714 over Tri. Morrison Creek. ATB-SR534-10.57 sfn# 0406953.~|~17 - Construction Engineering~|~B0D5318C5BFF3705FC96A78114CFEDF31EB4C91D 127087~|~1~|~1~|~01/SAF~|~Plan Split for construction. ~|~21 - Safety~|~56FBBDDAEFFCBDD2C3F53C3AD6B0BD5D3B4C7A1C 103849~|~1~|~1~|~01/S>2~|~Bridge repair on NHS route bridges.~|~13 - Bridge Rehabilitation~|~FBB7892F21AB565D45259DFAAC892AC24959A424 109666~|~1~|~1~|~01/NFP~|~Spot paving various locations~|~05 - 4R Maintenance - Resurfacing~|~212AED113FE6C43399ECA8ECEA1DDB3594057D94 81283~|~1~|~1~|~01/BRF~|~Bridge replacement of sfn# 7632789 over the East branch of the Nimishillen Creek, in Plain Township, Stark County, Ohio.~|~10 - Bridge Replacement~|~1BBBF962A9F686C8EB73348A390EB8FA0DE8FC9E 81283~|~1~|~2~|~02/NFP/Cant~|~City of Canton waterline work. 100% Local cost.~|~43 - Utilities~|~AF679AEAEDDDE747D127BF27C541F2B4483C551D 92897~|~1~|~1~|~01/NHS~|~Signals~|~21 - Safety~|~089BA19684B614D5552A620A83C56FC61B239D44 92897~|~1~|~2~|~02/NHS~|~Change order for nonreturnable signal materials (4PS7).~|~44 - Other~|~5AC302869D67ECE88EB3FFD2514845A196CBD77B 106633~|~1~|~1~|~01/ENH~|~Plan split~|~28 - Facilities for Pedestrians & Bicycles~|~0DF48EFEA5BCE59BD8F3901376E88BADBDB4B076 91684~|~1~|~2~|~02/NHS~|~This split is for the NHS bridges on the project.~|~13 - Bridge Rehabilitation~|~B162624123E5A85762F89677600EC5A60453DE4B 91684~|~1~|~3~|~03/STR~|~District Wide bridge maintenance for FY2017. This plan split for the rural locations.~|~13 - Bridge Rehabilitation~|~7F6315523FB3DF44417B18CA5F64A6E34F250831 91684~|~1~|~1~|~01/IMS~|~District Wide bridge maintenance for FY2017. This plan split for the interstate locations.~|~13 - Bridge Rehabilitation~|~6C019BD636A12243FF209AF0077CD5A2C0D52E89 86216~|~1~|~1~|~01/BRO~|~Abutment repair work on I-71 structure:4903188 MAD IR71 4.54 Intersect: Mud Run01/BRO/BR/~|~13 - Bridge Rehabilitation~|~3EED1D258F9C495ED7E2FD765F502E552E787643 115919~|~1~|~1~|~01/SAF/CCEO~|~"01/SAF/PV/CCEO" - 90% Federal (4HJ7) and 10% State (4BC7) - widening of CR 12 for buggy lane~|~21 - Safety~|~3920ED16E4CAC756E50CA8A228FA9966BE43855B 100242~|~1~|~1~|~01/NFP~|~All work in this project.~|~99 - State Preventative Maintenance~|~40CFD792B8495FC05A4F0C10B1D0058E3130E6AF 125996~|~1~|~1~|~01/IMS~|~Split~|~05 - 4R Maintenance - Resurfacing~|~EAA60A33DE4C8975308A484FDC003B83137EDFA3 110467~|~1~|~1~|~01/SAE~|~Implement access management by closing driveways and restricting driveway movements along SR 73 and Main St.~|~21 - Safety~|~0D66CE5BBDF9E42A47B7E5AF48B393467CBFA4C3 109859~|~1~|~1~|~01/NHS~|~ROS 23 8.23-16.32ROS 35 34.50-36.98~|~05 - 4R Maintenance - Resurfacing~|~6B2F5E434961944FBEAA1509C207763BD5F40DDB 109859~|~1~|~2~|~02/S<2~|~ROS 28 15.98-17.30ROS 50 16.93-18.67 / 19.35-19.67~|~05 - 4R Maintenance - Resurfacing~|~0D4D9EBB719140B93C856F38C2A1FDF3CAED7FA0 109859~|~1~|~3~|~03/STR~|~ROS 28 8.80-15.98ROS 50 29.02-32.14 / 33.35-34.89~|~05 - 4R Maintenance - Resurfacing~|~6606D134274F5710630B7EFB8DAF50404D9D31D6 109859~|~1~|~4~|~04/S<2~|~Local Match - ChillicotheROS 104 13.11-14.40ROS 772 15.27-16.14ROS 50 21.78-24.13~|~05 - 4R Maintenance - Resurfacing~|~0A508EFDD70344BCD5A8EBC4571E20B331444F48 104994~|~1~|~1~|~01/NFP~|~District Preservation Other Funding - 4PS7 (100% State) - No CAP - Application of Fast Dry Pavement Markings in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~42B4ABBABADA5C3D5E993DE749AEE8C22C5F5BA4 119206~|~1~|~1~|~01/IMS~|~Plan split for conduit rehab.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E5512BC1B616E4372AA76ADA326AD337307EBBB 95552~|~1~|~1~|~01/STR~|~It is proposed on SR247 begining at its intersection with West Main St. in West Union (SLM 7.41) heading north and terminating at its intersection with SR32 (SLM 17.12), it is proposed to resurface the highway with asphalt concrete.80/20 split~|~05 - 4R Maintenance - Resurfacing~|~6AE1E276BB87E7511AF460E5E5731195A9CB4C1D 95552~|~1~|~2~|~02/STR~|~Bridge Plan Split~|~13 - Bridge Rehabilitation~|~788DA22A08EC546ED9432FE9763D513D1E821933 101034~|~1~|~1~|~01/NHS~|~Upgrade the traffic signals at the intersections of SR741/Lyons Road and SR 725/Yankee Street to install backplates and dilemma zone detection. CCTV camers will also be installed at both intersections.~|~21 - Safety~|~C9C08F7072D963DD9F244D6F8EEED767C25FFAD6 90756~|~1~|~1~|~01/ERD~|~Project includes the complete rehabilitation of Bridge GRE-TR 47-Anderson Fork Pedestrian (SFN: 2935465), a timber truss covered bridge, maintaining the historic integrity of the structure.~|~13 - Bridge Rehabilitation~|~676973A736F95209FCD29FC6926C3903AF6644AE 96171~|~1~|~1~|~01/NFA~|~This project is moves the County Garage to the District Complex and constructs salt and equipment buildings~|~01 - New Construction~|~FF8F7E32D782CC35BA779CC1827AA2E78BAE881B 115752~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving ~|~05 - 4R Maintenance - Resurfacing~|~161E1952CD4F69285E12ACA62FDA3387B1AA9569 115752~|~1~|~2~|~02/S<2/NRWD~|~Plan Split for the 100% City items on the urban paving~|~05 - 4R Maintenance - Resurfacing~|~F2FF8A2B31A4105DE85811FE2F65F43695C157A7 120668~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the installation of turn lanes on US-20 & re-aligning the south leg of CR-3~|~21 - Safety~|~C0CE421EEF63BA6FAC1A23652DB2D382299B3BE3 84586~|~1~|~1~|~01/NHS~|~Resurfacing of US-30 from SLM 31.96 to SLM 33.45 in the Village of Minerva, Stark County, Ohio. And State Route 183 from SLM 16.18 to SLM 16.40.~|~05 - 4R Maintenance - Resurfacing~|~1CBCDFE207270693432BF36588E41E94BA6F2B82 84586~|~1~|~3~|~03/STR~|~Resurfacing of State Route 183 from SLM 5.88 to SLM 16.18, in the Village of Minerva and Paris Township, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~22CF710FD5B1B6544176D5A720363FF15060A10B 84586~|~1~|~2~|~02/NHS~|~Structure work on SFN# 7601204, STA-US30-32.63 over the Big Sandy Creek, in the Village of Minerva, Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~72D11E9240C938FBEF910F37BC4FC66308674A42 84586~|~1~|~4~|~04/STR~|~Structure work on SFN# 7605625, STA-SR183-5.99 over Sandy Creek, in the Village of Minerva, Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~D3DFB0B76FCB715957DC07BCA3281C76FCBC03BF 93588~|~1~|~1~|~01/ENH~|~Added pedestrian connections for Athens City Schools using the Safe Rotes to School funding, 100% Federal. Begin at Athens Middle School and end at 2nd and Watt Streets.~|~28 - Facilities for Pedestrians & Bicycles~|~79EA06EA5D4D01917FEB501070C4A7596395D707 111250~|~1~|~1~|~01/ENH~|~Trans. Alt. Funding Plan split~|~28 - Facilities for Pedestrians & Bicycles~|~E4C7BD6DABE16B8ABF474BB1CE695E92C30F6073 107400~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Rehabilitation of SFN 4502973 carrying CR 41 (Mink Road) over IR 70~|~10 - Bridge Replacement~|~95872753138F0515D95FA50ED563515839595918 119975~|~1~|~1~|~01/ENH~|~Upgrading deficient curb ramps in the City of Athens. Work includes the full removal/replacement or installation of detectable warnings.~|~28 - Facilities for Pedestrians & Bicycles~|~19C1C41A20BDFB018BDF077296F117AC74E53669 127117~|~1~|~1~|~01/STR/BEL~|~Resurfacing on County Roads using 80% Federal/20% Local funds.~|~05 - 4R Maintenance - Resurfacing~|~8AD8255ABF1956850E98ED69576828410FE9762D 102988~|~1~|~1~|~01/STR~|~Bridge replacement project on GAL 218 5.78, SFN 2702584. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~CF2E883B71404848757FE2C6A1C6A36B29D07937 116327~|~1~|~1~|~01/S<2~|~Resurfacing from SLM 0.28 to SLM 4.35~|~05 - 4R Maintenance - Resurfacing~|~5D72B820F0154C0068FE3634D9299EA0C82B1875 116327~|~1~|~2~|~02/STR~|~Resurfacing from SLM 4.35 to SLM 5.45~|~05 - 4R Maintenance - Resurfacing~|~5FC9FA4F1199A64518C9E492FA3A5F776DF452AC 82974~|~1~|~1~|~01/NHS~|~District Wide Crack Sealing project for the Priority System for FY2016, Routes included are BUT-4 and HAM-42~|~99 - State Preventative Maintenance~|~A671A2FC982FD44DC73C58FD5A2E7D63D7C1805D 100585~|~1~|~1~|~01/STR~|~ADA 348 0.00-13.55BRO 123 0.76-3.46BRO 756 0.00-1.97BRO 505 0.00-10.39~|~05 - 4R Maintenance - Resurfacing~|~B3B9C9502C6AFDBA9F0032256222E51791BE7747 100585~|~1~|~2~|~02/NFA~|~BRO 123 0.00-0.76~|~05 - 4R Maintenance - Resurfacing~|~0E9A61004CB80475F1E08C1A2F9894A3443D6785 107735~|~1~|~1~|~01/STR~|~Covers all work to rehab bridge.~|~13 - Bridge Rehabilitation~|~7023A8DC1FEA3C253865A0863DE3E4C012D6D048 116023~|~1~|~1~|~01/NHS~|~Bridge maintenance work. ~|~04 - Reconstruction - No Added Capacity~|~C8B1E876A207946A69908E57E270031B23E001BD 109508~|~1~|~1~|~01/IMS~|~Bridge hit, Emergency B repairs to the linked structure.~|~~|~0A61F1D90DAC7C4409153301B14A1DBB5947D1B0 126691~|~1~|~1~|~01/STR~|~Flat Sheet sign replacement project in FY2024 HOC county.~|~21 - Safety~|~18F3DB5711EFE350C9A8BEFCC8AE335144822AEB 84591~|~1~|~1~|~01/IMS~|~District Allocation 90/10~|~13 - Bridge Rehabilitation~|~C2D0C22B0C5D6999B2CEF1FE1D3DC59F9824ADCC 107734~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 5.95-6.00. DSR MOE-003. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E409F7F8D31BE79C8003397401FD9DB1662D6FFA 108180~|~1~|~1~|~01/NHS~|~Rock fall repair from OH18-01 ER Event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4097ACD345671B3B003A2F919AC7BB5953AF8B99 96812~|~1~|~1~|~01/S>2~|~Intersection improvement of CR106/TR107.~|~04 - Reconstruction - No Added Capacity~|~73E6B1A80DEE6A069450B218437EFBF41057B92A 96812~|~1~|~2~|~02/BRF~|~Structure rehabilitation - deck replacement of CR106 over Alum Creek.~|~13 - Bridge Rehabilitation~|~C17F46E3E464B2EF16988CE732113B048C0CE3CC 105209~|~1~|~3~|~03/NHS~|~Replacing structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~5D1D3A50F3A3DD4DA1FBBFA6B2D55C27377DB040 105209~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4A00D1EE33BE559F32F05218C4EF65A12AB9FAB8 105209~|~1~|~2~|~02/NHS/YOUN~|~SR 616/US 422 intersection items including ADA curb ramps, manhole, valve and monument box adjustments.~|~04 - Reconstruction - No Added Capacity~|~4E6F1F9E22D7102F03C5D7D4EAEF9A103F3D69AA 124875~|~1~|~1~|~01/S5K~|~Small City funding~|~04 - Reconstruction - No Added Capacity~|~DF6ECD9A19EA061BF3F647CE915C50386FED647E 116734~|~1~|~1~|~01/IMS~|~Split for resurfacing work. ~|~05 - 4R Maintenance - Resurfacing~|~520EC5D0930A5DCCF62CE78E23CB34600E305F98 109743~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~D525716BFDFCCEDAD605376A93E7FC8645CD23BE 120572~|~1~|~1~|~01/ENH~|~Washington Street Sidewalk Replacement ~|~28 - Facilities for Pedestrians & Bicycles~|~34F9120CAFEE2DBD9A8361D1F88CFEEED4153B15 97313~|~1~|~1~|~01/STR~|~It is proposed, using CEAO Safety Funds, to install new and upgrade existing pavement markings on various routes within Jackson County.~|~21 - Safety~|~7FF9C39CB238B96306C4EFDCA364844D37B62C55 119216~|~1~|~1~|~01/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~AE8F90065DFFB0D1004272CBA2902205FBCBAACB 119216~|~1~|~2~|~02/S>2~|~City of Worthington Plan Split~|~05 - 4R Maintenance - Resurfacing~|~84C3638F94216FFC462E6BD575D1411C8D1DAD41 119216~|~1~|~3~|~03/S>2~|~City of Columbus Plan Split~|~05 - 4R Maintenance - Resurfacing~|~29FEA83AD0808E735EEA006BD44F4CE050CDBA27 121105~|~1~|~1~|~01/MPO~|~Primary plan split for MPO CRP funded scope.~|~28 - Facilities for Pedestrians & Bicycles~|~179768AF85B4BE62406C76DDA7D793687105980E 108415~|~1~|~1~|~01/NFA~|~Widening of Tallmadge Rd.~|~01 - New Construction~|~B417EAA28FADD82936AE208E9DCDC0F8CB0654EE 106148~|~1~|~1~|~01/S<2/BPRT~|~ER Event OH17-01, DSR BEL-007~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3B628488789C54698680758772C81C1BDBCEDC25 104115~|~1~|~1~|~01/NFP~|~plan split~|~44 - Other~|~DF5668B63D1D69380774A6E97515B280BF9E6BB6 121721~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs ASD-250-17.325 to 18.866 including bridge maintenanceFine Graded Polymer Asphalt Concrete Overlay (smoothseal) ASD-250-18.866 to 24.745 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~F3AF49C4AF913EC761254C204A3B9BF69C58A0DB 121721~|~1~|~2~|~02/NHS~|~Partial Depth and Full Depth pavement repairs ASD-250-17.325 to 18.866 100% Local Funding~|~05 - 4R Maintenance - Resurfacing~|~7321DD28E73E9A149B58178F421DB038ACC30B0D 121721~|~1~|~3~|~03/NHS~|~Asphalt Concrete Overlay ASD-250-17.325 to 18.866 Fed / Local Funding~|~05 - 4R Maintenance - Resurfacing~|~046301EDC96712A09EDFF64E39E1014894239290 116659~|~1~|~1~|~01/S>2~|~Plan split for the large urban locations~|~05 - 4R Maintenance - Resurfacing~|~B9A50923D41791B49CAE2F79E95970D70BA29680 116659~|~1~|~2~|~02/STR~|~plan split for the rural locations~|~05 - 4R Maintenance - Resurfacing~|~D6D85073761120B65DF50B5E848919C1487ED45B 124739~|~1~|~1~|~01/SAF~|~Traffic Signal Replacements: LOR-82 @ Durkee Rd, LOR-82 @ LOR-83, LOR-82 @ Island Rd, LOR-18 @ LOR-301Overhead Flasher Replacement: LOR-57 @ LOR-82100% State TSMO Funding~|~21 - Safety~|~08A14E43C54BA5E89BA15B4C75E61294134E2295 94064~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - ODNR Funds 4BF7(100% State) - No CAP - Resurfacing within the Woodbury Wildlife Area~|~~|~94AB9E86880E0F29AC27FB96A92EC29F9D2F37EA 106136~|~1~|~1~|~01/NHS~|~Replacement of linked structure 10 ft to 20 ft span.~|~04 - Reconstruction - No Added Capacity~|~305196C8687FB18F47FE2D1B4BCB83D4926729C8 106136~|~1~|~2~|~02/NHS/HUDS~|~Multi-purpose trail/path. Removal of barnstone. City of Hudson 100% expense.~|~28 - Facilities for Pedestrians & Bicycles~|~83E2EDDC3B96B8CBBC38F3547299185D5FEB9483 106136~|~1~|~3~|~03/NHS/HUDS~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~6A09B0ECFF462B5FE5A8252308E0EA5CE98119B1 83645~|~1~|~2~|~02/STR~|~80/20 fed/state funding split for all work using federal rural STP funds from SLM 30.48 to SLM 31.93.~|~05 - 4R Maintenance - Resurfacing~|~7BD8849CF043D813CE14374B5EB46B379F0DE29B 83645~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal urban STP funds from SLM 28.30 to SLM 30.48.~|~05 - 4R Maintenance - Resurfacing~|~8F7879C8CC41566E483034BFBA8B8971CEC18875 114203~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay treatment. NOB 77 0.00-1.56 and WAS 77 16.40-17.64.~|~05 - 4R Maintenance - Resurfacing~|~6AD3A645D3944AA735E5262E68F0244FB5DE00A2 114203~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~83101C4B2D231E3F5E58BE47677ECB75B8250CE9 114289~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8.~|~21 - Safety~|~71FE51EEA0BDDDE2E23C7AD34CBA9C2647650412 114289~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7.~|~21 - Safety~|~F3B7447D30AB382849D60A15066025C77BD78D1C 125658~|~1~|~1~|~01/IMS~|~Resurfacing I-75~|~05 - 4R Maintenance - Resurfacing~|~FFE4741E9F0BDF4669E9421685D58F48C36E15D1 125658~|~2~|~2~|~02/IMS~|~Plan split for the Part 2 work for full depth pavement replacement beneath Tylersville overpass.~|~05 - 4R Maintenance - Resurfacing~|~1CC9BF3E0DAB12A747811579C296E91A24813F68 125658~|~1~|~3~|~03/SAF~|~HFST on 2 ramps at BUT-75/129 interchange. ~|~21 - Safety~|~9144891B2503836D33C67635156483B8728B1D88 103157~|~1~|~1~|~01/NFA~|~Construction of an access road between Mill Street and Stimson Avenue with associated intersections improvements.~|~01 - New Construction~|~681CE6BB4F89F890E90CFBF6B9A8CD3076C6458B 101294~|~1~|~1~|~01/STR~|~FUL-120 and WIL-49~|~05 - 4R Maintenance - Resurfacing~|~764B05C89379BD768476CA68BEF536B8BE8A4E1E 117609~|~1~|~1~|~01/BRF~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~4B7E6A457538B8DCDEC01C6456E321240AE73524 126330~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~DCEBE61AE465E4483562D4BF637F75550514B141 107328~|~1~|~1~|~01/NFA~|~HIG 771 0.00-6.11~|~05 - 4R Maintenance - Resurfacing~|~FA562F073A00F5A603B0C5F22727042C6D26F102 107328~|~1~|~2~|~02/STR~|~JAC 776 0.00-9.28PIK 776 0.00-0.99SCI 776 0.00-2.69~|~05 - 4R Maintenance - Resurfacing~|~AFBECBDBB926290A4A76B3C851AF1261249C5B6F 107328~|~1~|~3~|~03/S<2~|~JAC 776 9.28-11.44~|~05 - 4R Maintenance - Resurfacing~|~D03F78F30DDAF3E090058B76E58609030AC38761 97321~|~1~|~1~|~01/NFP~|~Ohio's & WVDOH's share of the East Huntington Bridge painting project. Includes Inspection.~|~47 - Bridge Preventive Maintenance~|~9A8B90FF8CAFA4C315453FFFE4C1697F7DF10CD1 83147~|~1~|~1~|~01/IMS~|~100% State Noise Wall funding~|~44 - Other~|~59A0739577B2BCAC6CC58D967A563CEAB6442CB2 113895~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~F475BD5D04E724BF12C86DC9CE259AEAC95996DE 93200~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing with asphalt concrete in Dayton on SR 4 from SLM 16.53 (Patterson Street) to SLM 17.06 (Keowee Street).~|~05 - 4R Maintenance - Resurfacing~|~79A86F4C5925EA66D5FC2EE3E268C5BF79C49B35 99012~|~1~|~1~|~01/BRO~|~Bridge Split~|~47 - Bridge Preventive Maintenance~|~5BCEFACB8527279AAE8D7D1E6118A35094D8F5D6 99012~|~1~|~2~|~02/BRO~|~Veterans Memorial~|~47 - Bridge Preventive Maintenance~|~901C86BB1D74B422E4C512648FEEFA7817B07FD2 125735~|~1~|~1~|~01/STR~|~NOB SR 260-0.00-1.90~|~05 - 4R Maintenance - Resurfacing~|~18F8081F928329F3245BA052438A0A5FCCB60455 125735~|~1~|~2~|~02/NFA~|~NOB SR 260 0.00-1.90~|~05 - 4R Maintenance - Resurfacing~|~0B6FDD5874F3E0FCD4117189555CA3BE3914B5D3 124031~|~1~|~1~|~01/NHS~|~Interchange Improvement at US 23 and Home Rd~|~03 - Reconstruction - Added Capacity~|~2E4857A90ED2173E99670E7344131FDD5354A9C3 120886~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~A95482F6F7197C901A6DAC5B6611A52A8BAEC1B8 124328~|~1~|~1~|~01/ENH~|~Sidewalk project in Savannah - Tap Funded~|~28 - Facilities for Pedestrians & Bicycles~|~1B301E5EDA588048FCF99AEF2A2F7E638F7BFA94 124328~|~1~|~2~|~02/S5K~|~Ongoing Engineering Services for Savannah Sidewalk Project~|~17 - Construction Engineering~|~2A75C653CF5943D35FB12FDC7D09F546A6931261 92142~|~1~|~2~|~02/NHS~|~80/20 fund split for federal NHS route bridges not eligible for BR funds: 4300092, 4301293~|~13 - Bridge Rehabilitation~|~01582C50F98FF23CB07648F489A59A2929F511C8 92142~|~1~|~3~|~03/BRO~|~80/20 split for bridges eligible for federal BR funding: 4300122, 4300300, 4300335~|~13 - Bridge Rehabilitation~|~72EBC08E25A04B1414EA09D07836241A676594F7 92142~|~1~|~1~|~01/IMS~|~90/10 fund split for federal IM funds for the following bridges: 1802054, 1803549, 1814079, 1814664, 4303660, 4303695, 4303784, 4303814, 4303962, 4303997, 4304233~|~13 - Bridge Rehabilitation~|~909F1B95276675FCEC0EA952C8507905C29E6F87 93624~|~1~|~1~|~01/NHS~|~Lengthen turn lanes along US 33 Super 2. Ath US 33 20.52-20.70, 23.16-23.34 and 26.19-26.37, all segments LT and RT. Federal 80%/State 20%.~|~17 - Construction Engineering~|~D3AFCF78BEAAD87B70771459D1985127AE99995E 103830~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate bridges.~|~13 - Bridge Rehabilitation~|~8B72A0E818B2EFCC9E220C2B13262BB4606C5641 99599~|~1~|~1~|~01/NFP~|~District 11 guardrail reconstruction and repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E6EE6A37CC7BAED7E26E4A7B0955F7855F975BEC 110275~|~1~|~1~|~01/NHS~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 21.86-22.20. NHS route funded 80 federal CMAQ/20 local.~|~~|~F6B7A3C0D685A0CCB4BEB2430DE6908A45A168F8 110275~|~1~|~2~|~02/NHS~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 21.86-22.20. NHS route funded 100 Local.~|~~|~95F66DD13E0F8D9D5C9C2F31F3D7878956175FB6 107740~|~1~|~1~|~01/STR~|~Culvert~|~17 - Construction Engineering~|~09627CE45DF886F50571AF32CD5D31C2AE90D0C0 112755~|~1~|~1~|~01/MPO~|~Resurfacing of New Milford Rd from Tallmadge Rd to SR 5/SR 44 bypass and Tallmadge Rd from SR 44 to Alliance Rd.~|~05 - 4R Maintenance - Resurfacing~|~3514F3E6880C6A1022CC888DBFE6742B91ECC8AE 107522~|~1~|~1~|~01/NFA~|~Resurfacing COL-164 from SLM 18.00 to SLM 21.54~|~05 - 4R Maintenance - Resurfacing~|~1157231CE52CC181EE47B1C3BF2093C3F989458D 107522~|~1~|~2~|~02/S<2~|~Resurfacing SLM 21.54 to SLM 22.23~|~05 - 4R Maintenance - Resurfacing~|~F50BD9F5A2D05C80A9F571038538FD6A95EDF4B7 107953~|~1~|~1~|~01/IMS~|~Landscape maintenance and upkeep on existing landscape at the I-70/I-75 interchange in Montgomery County.~|~31 - Landscaping & Other Scenic Beautification~|~99F210ED9A0A2AF06B2D37ADC52C0D0BB944BC04 119868~|~1~|~1~|~01/IMS~|~Spring Remediation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A4410FE25DC8824EA0CF59FFB28A2587874593FF 121855~|~1~|~1~|~01/S5K/CAMB~|~Repair and replacement of sidewalks and curb ramps along South 11th Street. (TAP Safety 80% 4B37/20% 4HJ7)~|~28 - Facilities for Pedestrians & Bicycles~|~4296E93A2110759EA63CF790B46012B150C05BA3 126967~|~1~|~1~|~01/IMS~|~Deck replacements~|~13 - Bridge Rehabilitation~|~D6E0F0DCE9E38DE882ECFD5A02BFF184106C07EA 94334~|~1~|~1~|~01/STR~|~From SLM 2.52 to SLM 9.22~|~05 - 4R Maintenance - Resurfacing~|~9FA7852EE5C740EEB0AE68FDC3A7EC433153ACB1 94334~|~1~|~2~|~02/STR~|~Wil-49 culvert @ SLM 4.07~|~04 - Reconstruction - No Added Capacity~|~284F2FBFA8C4BCD5B61990ABB4BE076E8BED6B28 94334~|~1~|~3~|~03/BRO~|~Plans split for bridge work - Deck sealing~|~17 - Construction Engineering~|~7E55CA3D4DE952BF6C774B5A6284A2E2977AB93D 94334~|~1~|~4~|~04/NHS~|~Add pressure relief joints - Wil-6-3.55~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~515C32561F782273029329C60491AA588BC4B071 98324~|~1~|~1~|~01/SAF~|~80% federal using with 20% local match on SRTS eligible work items.~|~44 - Other~|~A668C486DD8BA4E24545B5316F09A6C21ECA5F56 75117~|~1~|~2~|~02/NHS/ADA~|~test~|~~|~5D3C0C1C45F33E35AEAE0233CEB413DB3ADA2236 75117~|~1~|~3~|~03/NHS~|~test~|~04 - Reconstruction - No Added Capacity~|~7F92EE449F0BF74A02D886C45D2F28768B0B20BF 75117~|~1~|~4~|~04/IMS~|~test~|~~|~D656DB1602BACC59F319FC89B54F0C7A2FDB51A8 75117~|~1~|~5~|~05/IMS~|~teast~|~01 - New Construction~|~C7140934DE7DDD600D627EC895419F9063BD775C 75117~|~1~|~6~|~06/ERD~|~astdas~|~~|~2BBF53BDA1C95956A2017C98D942CD284EAAB410 75117~|~1~|~1~|~01/S<2/camp~|~Ut non eros ac libero suscipit imperdiet. Nulla facilisi. Nullam a velit arcu, sed feugiat velit. Sed ligula ante, consequat ut euismod ultrices, aliquet eu elit. Ut tempor turpis sed ipsum rhoncus ac bibendum nibh placerat. Etiam leo nunc, vestibulum a fermentum id, condimentum id orci. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia Curae; Vestibulum non magna condimentum ligula semper faucibus. Suspendisse ac ligula lacus.~|~01 - New Construction~|~91E80BFE2799B84330F5ED632A600900BF0E89CF 75117~|~1~|~7~|~07/IMS~|~Test~|~~|~061DFC744883EF2EE418EAF37A6FC5A17BD92D64 75117~|~1~|~8~|~08/IMS~|~Test~|~~|~3EB1B4D5DDD999A66361079AFDA4DA6FD946E5F9 95860~|~1~|~1~|~01/NFP~|~@ SLM 30.60~|~04 - Reconstruction - No Added Capacity~|~5031BB81C2034CDE5252DF5EEA54B938769DFF52 115116~|~1~|~1~|~01/BRF~|~Rehabilitation/replacement of historic bridge (SFN 4131126), funded at 100 with CEAO 4B87 funds and 80/20 split with BHJ 4TA7 funds up to respective caps.~|~13 - Bridge Rehabilitation~|~9C3D04459FA13A2B8C23D8940B1A31443D1BF57A 22215~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1810421~|~13 - Bridge Rehabilitation~|~E621A824B45537D4A1471F2BFF9D6BE89D5475F6 101297~|~1~|~1~|~01/STR~|~OTT-590-0.00 to 4.02~|~05 - 4R Maintenance - Resurfacing~|~E38B8A6DE45E67B0F8D5753F4E60AAC2AAAAF17E 106883~|~1~|~1~|~01/NFP~|~Loop detector maintenance.~|~21 - Safety~|~011D7CC2B17F9BAAA3B8B10A5815CCAE7C0EF2A1 110166~|~1~|~1~|~01/STR~|~Culvert Repair/Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AFC5EDA0B66D9B95784EB932522D7F8C386DA65C 110166~|~1~|~2~|~02/NHS~|~Culvert Repair/Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AE4AE7B4AA40E3EC059C28B520CC7DADF2C73942 98161~|~1~|~1~|~01/ENH~|~Creekside Trail: from Alpha Road in Beavercreek Township to Xenia Station in Xenia. Apply 1.5 inches of asphalt over the existing surface course. Installation of a 3' wide topsoil berm against new pavement with seed, fertilizer, and mulch. Application of thermoplastic pavement markings with silica sand for skid resistance. Full depth pavement repairs where needed.~|~28 - Facilities for Pedestrians & Bicycles~|~2E7427DC7FB9D3858F76B2CDD9900223069A9724 110815~|~1~|~1~|~01/NFP~|~ODNR Roadway Maintenance Program project to resurface Main Road in Findley State Park~|~05 - 4R Maintenance - Resurfacing~|~EA23A7C0C68D106D3E5FD7E12485586C0D7F60E6 119413~|~1~|~1~|~01/NFA~|~NOB TR 392 0.02 Bridge Replacement~|~10 - Bridge Replacement~|~DDB8D1EB5A56D18E76AF3ABE3290F42EDB126F23 126897~|~1~|~1~|~01/IMS~|~Plan split for annual tree clearing within right of way utilizing 100% state maintenance funds~|~99 - State Preventative Maintenance~|~2901CB364172E295D14232F714727F234BC73C4C 121202~|~1~|~1~|~01/STR~|~Culvert replacement project. MRG 669 2.09. CFN 1876967.~|~04 - Reconstruction - No Added Capacity~|~7AABA18FCBD04D62F869888D26DB10BEAC10FF44 127188~|~1~|~1~|~01/S5K~|~Urban Paving plan split~|~05 - 4R Maintenance - Resurfacing~|~BABA4EA31CED79E4D69232B637821475FA5CFC8F 127188~|~1~|~2~|~02/S5K~|~100% local items~|~05 - 4R Maintenance - Resurfacing~|~366839D52AF6E68E983C3C6AD0DA0468FDD5A271 114882~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~6748F11B4748D65C966AE6DD6B64DC4F32DB9B3E 107245~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 12.89. GSM funded. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~36660C15716DD24CF84D0B0C4378DDF29DEF282A 113347~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (State 100%) - No CAP - Annual contract for mowing along the Interstate and interstate look-a-likes in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CBDB1B6537C8BC214696A9927806C94242D3323D 80075~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Slip repair on MUS US22 19.92-19.96~|~~|~DA3082692D88D91CC4B135BEDE56CB357F4A35BA 98625~|~1~|~1~|~01/SAF~|~Sidewalks~|~21 - Safety~|~0E229BD89E1309C5867A3FDD166EE6BB984D0D48 112253~|~1~|~1~|~01/IMS~|~All items of work on DEL-71~|~05 - 4R Maintenance - Resurfacing~|~AC557361E05CA1444A586D7EE53F1561C86EC239 83709~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 664 16.33-16.54. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~1828746BDF6F1C58617992ABB4F044713EE2E2BB 83709~|~1~|~4~|~04/S<2~|~Curb ramps and gutter work within the city. HOC 664 15.94-16.33. Urban other federal aid funded 100% Local.~|~05 - 4R Maintenance - Resurfacing~|~27B1A11FAF5ACD8534600B5CDC1C3429DE9D5A0E 83709~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 180 0.49-7.35, and HOC 664 16.54-24.50. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~334144A932F2C56C1B24E3751C23D7A77086FB01 83709~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 664 15.94-16.33. Urban other federal aid funded 80 federal/ 20 local.~|~05 - 4R Maintenance - Resurfacing~|~B4920728BF7B20478D1DD56A42ACD16D0B24382E 120105~|~1~|~1~|~01/NFP~|~Covered bridge deck replacement.~|~40 - Special Bridge~|~6DB7AE689015B4F0576892E0EA2F055D9F186C6D 96668~|~1~|~1~|~01/NHS~|~Plan split for all pavement work in the project. The work includes mainline and ramps within the project between SLM 20.94-27.23.~|~05 - 4R Maintenance - Resurfacing~|~0273F4014199FA0B88E9737F5D3AE0F1BB598161 96668~|~1~|~2~|~02/NHS~|~Profile correction.~|~47 - Bridge Preventive Maintenance~|~D1A1ED2E38A345B97FC1B10A2C6A6445EEA014E8 92950~|~1~|~1~|~01/SAF~|~Installation of 33 uninterruptable power supplies in various locations in Clark, Miami, and Montgomery Counties.~|~21 - Safety~|~F2B4FDAA43D4AB57E686919C3F991F0ED894148E 85207~|~1~|~2~|~02/ERD~|~80/20 funding split for Transportation, Community and System Preservation Program Earmark TC1101.~|~04 - Reconstruction - No Added Capacity~|~2E12025482628EC3376CDC5DA1D470EC69AD6AE6 85207~|~1~|~1~|~01/S>2~|~Multiple fund sources the intersection work:90% federal - 10% local funding split utilizing federal safety funds.80% federal - 20% local funding split utilizing MPO CMAQ funds~|~04 - Reconstruction - No Added Capacity~|~FF7C6DC303F144EAF5448021CF96B9FD62BC3435 124679~|~1~|~1~|~01/S5K~|~Road reconstruction project~|~05 - 4R Maintenance - Resurfacing~|~20C059AD023E80F773009C357A3C66DE5E1D1AF3 114264~|~1~|~1~|~01/MPO~|~Construction of a shared use path along E. Main Street from Dela Palma to SR 133.~|~28 - Facilities for Pedestrians & Bicycles~|~64B2C219A2B576233089795BA8D5DEBB85A2B6F3 91862~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete in Sidney on State Route 47 from Fourth Street (SLM 14.51) to Ohio Avenue (SLM 15.46)~|~05 - 4R Maintenance - Resurfacing~|~A482378D78B66C9B52F2C6D4A176C163545DE69E 126301~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~363BB06FF809837E0342EA2EE2C827E0ACE42532 87577~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation - No CAP - Location = 4202252 KNO US62 18.82 Intersect: East Br Jelloway Cr - - SFN 4202252 qualifies for replacement - Length - 53' - SD(1) - SR 24.3~|~10 - Bridge Replacement~|~8C7006FA1E638CD3A47916765675E168BC3C9267 101743~|~1~|~1~|~01/STR~|~Resurfacing 7.32 miles of two-lane road. WAS CR 2 5.57, CR 3 13.19. Work includes spot base repair, striping and the removal/replacement of RPMs. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~BE1DDED1AF6DA4BC07D1EDDCD1495D274FA07476 97846~|~2~|~2~|~02/BRF~|~OBPP replacement of SFN 4130227~|~10 - Bridge Replacement~|~2CA7318747D73EB13F55B3878D3491A6EEE90743 97846~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 4130235~|~10 - Bridge Replacement~|~BCAA5B7141C94F1699159C104918571B38569EC9 96737~|~1~|~1~|~01/ENH/KNOX~|~"01/ENH/OT/KNOX" - Knox County TA project for construction of dual use path - Federal approved max of $97,782.~|~28 - Facilities for Pedestrians & Bicycles~|~9E0FB262764CC24867875E7F4718B8E21C28A300 116698~|~1~|~1~|~01/S5K~|~This plan split is for the signal work at the locations in Columbiana County on SR 170 and SR 267.~|~21 - Safety~|~D645FFEDF8381FA973B521E9536EDFC2621D8611 116698~|~1~|~2~|~02/S50~|~This plan split is for the signal work on US 40 and CR 28A in Belmont County.~|~21 - Safety~|~7ABBD107D83776938664D9FD24FA883C6ECC9B2E 116698~|~1~|~3~|~03/STR~|~This plan split is for the signal work on SR 800 in Tuscarawas County.~|~21 - Safety~|~A486734D8C10317BE760AD43130ED2FE91E0E797 101761~|~1~|~2~|~02/S5K~|~Resurfacing along STP Urban routes outside of city of Zanesville~|~05 - 4R Maintenance - Resurfacing~|~136F5550FB115644F5C6C16126CBE9227F627F6C 101761~|~1~|~1~|~01/STR~|~Resurfacing along STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~AFC9F860018615E6E9B132598C01AE2CCEDA3FE1 101761~|~1~|~3~|~03/S5K/ZANE~|~Urban paving within city of Zanesville~|~05 - 4R Maintenance - Resurfacing~|~AA2E21E5465533364DD0D669B1EF273EB74AA8D2 115545~|~1~|~1~|~01/NFA~|~Paving Lost Creek Metro Park lot at new building site.~|~05 - 4R Maintenance - Resurfacing~|~C74B69F1FDE753679CB650A751517E6822B55621 111041~|~1~|~1~|~01/NHS~|~LAW-52-18.61~|~04 - Reconstruction - No Added Capacity~|~52275C9FBBF4B11F6D5B260BA990146672219388 111041~|~1~|~2~|~02/STR~|~LAW-243-6.81LAW-243-6.94~|~04 - Reconstruction - No Added Capacity~|~DF02817EF023B4530FD9648322324E04C9BE8FE7 89198~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~5CB0E1EDCBB6DEF762DA55D4322219CBF07E3F8A 107452~|~1~|~1~|~01/NHS~|~See linked structure > 20' span.~|~10 - Bridge Replacement~|~3898AB77153D803EF4472DD140742A726D9A2A08 107452~|~1~|~2~|~02/NHS~|~Aqua Ohio water line replacement in the City of Massillon.~|~43 - Utilities~|~B32621928CFFF972C573502FF4C563A967F303B4 113832~|~1~|~1~|~01/BRF/GCEO~|~Guernsey County Engineer's Ohio Bridge Partnership Program - 5BP7 (100% Bond) - See CAP Comments - Replacement of SFN 3030776~|~10 - Bridge Replacement~|~6E7E89D768D7A7E2DDDEA6A0E58A81CF9A98609B 85076~|~1~|~1~|~01/MPO/Nort~|~New capacity and safety improvement on Cleveland-Massillon Road (CR-17), from Greenridge (SLM 8.99) to Pleasant (SLM 8.42), in the City of Norton, Summit County, Ohio. ~|~21 - Safety~|~92D32BF389CDC401CDED2F0DB9AC293F683CE77F 84471~|~1~|~1~|~01/STR~|~plan split for roadway work in the Rural sections:CLI-28: SLM 0.37-5.48~|~~|~7996A1D640503C7E0108A9376A8D44D930C51A0C 96596~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 285 0.96, 1.02, 1.58, 2.39, 3.31, 3.47, 8.11, and NOB 340 5.67. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5F03B3D26141CBD3055C0B1BF6EEC68DB34CFF51 109502~|~1~|~1~|~01/NFP~|~Install fiber optic cable along IR 71~|~44 - Other~|~1AA5B58DADDE689485A65372584A0464240A26ED 86943~|~1~|~1~|~01/STR~|~Resurfacing of ATB State Route 534 from SLM 13.50 to SLM 18.61, in Trumbull and Harpersfield Townships, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~3A8E17D8F474A46CD4829DF6A5FC9598CBF13C01 86943~|~1~|~3~|~03/S<2~|~Resurfacing of State Route 534 from SLM 18.61 to SLM 19.75, Harpersfield Township, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~AD911FBBB612D716C5333C27C14A713D547BE809 86943~|~1~|~2~|~02/STR~|~Bridge rehabilitation of SFN# 0407054, ATB-SR534-16.61 over Bronson Creek and SFN# 0407089, ATB-SR534-18.32 over Grand River, Harpersfield Township, Ashtabula County, Ohio.~|~13 - Bridge Rehabilitation~|~B1ABFEEB083A57DD8D609F10E5465B9EAD0288AE 86943~|~1~|~4~|~04/IMS~|~Bridge rehabilitation of SFN# 0407119, ATB-SR534-19.32 over Interstate 90-2.95, Harpersfield Township, Ashtabula County, Ohio.~|~13 - Bridge Rehabilitation~|~BE63E9294DDE205510C0BFB2FC43E5D6B7F5349F 116340~|~1~|~3~|~03/STR~|~plan split for the rural sections~|~05 - 4R Maintenance - Resurfacing~|~600EC111E263B40C8765B737B46A8697AE0ACC8B 116340~|~1~|~2~|~02/S>2~|~plan split for the large urban portions~|~05 - 4R Maintenance - Resurfacing~|~D2EF4432F95ABF110B729463472A6E7FC5A48976 116340~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of GRE-725~|~05 - 4R Maintenance - Resurfacing~|~EE367CD5186D63AB0967889804E603419A44A246 122174~|~1~|~1~|~01/STR~|~Culvert repair on ATH SR 144 4.082, SFN 1876926.~|~04 - Reconstruction - No Added Capacity~|~47E9BAE3A088B7D09A4C0D1876443B6AD6BD6774 101760~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~36FD382B45F77D2AB3C9398E154BF4BE0E0B9417 106549~|~1~|~1~|~01/NFP~|~Resurfacing sections of Hueston Woods State Park.~|~05 - 4R Maintenance - Resurfacing~|~4B69A8F52BB9CC81B74949B4AB588AA1BCA46304 121134~|~1~|~1~|~01/IMS~|~Mowing locations in D8~|~44 - Other~|~2459965F925E348824F9635EADB2AFFDB76026CB 121134~|~1~|~2~|~02/IMS~|~Mowing locations in D7~|~44 - Other~|~8E2C64BAD2E0AE72DB0459C47D7B7DF23A0F3D1C 116150~|~1~|~1~|~01/S5K~|~Plan Split 01/S5K/PV/ - Plan Split for MUS-146-9.925-10.390, 10.49-12.356, 12.482-13.01~|~05 - 4R Maintenance - Resurfacing~|~A8AEED87EE4690831D48613A002F067300931BC7 116150~|~1~|~2~|~02/STR~|~Plan Split 02/STR/PV/ - for MUS-146-2.21 to 9.925~|~05 - 4R Maintenance - Resurfacing~|~D225E4C5EA73D33229481BDD72D0F15F5701F62C 116150~|~1~|~3~|~03/S5K/ZANE~|~Plan Split 03/S5K/PV/ZANE - for Mus-146-10.39 to 10.49, 12.356 to 12.482, 13.010 to 13.313~|~05 - 4R Maintenance - Resurfacing~|~0CAB280E346E79EFBA72089F8D7DE2DC40B21746 122951~|~1~|~1~|~01/IMS~|~Emergency repairs to the Daniel Carter Beard bridge. Design Bid Build (Type 3 ER contract) for repairs that are needed but not absolutely necessary to reopen I 471 SB traffic.~|~13 - Bridge Rehabilitation~|~D79CCF607484C0953BED1CDA3F24E19F12C01E34 121324~|~1~|~1~|~01/STR~|~STP Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~2861FAC5027120B76E75981E1AFFEED447BB510F 88219~|~1~|~1~|~01/ENH~|~Construct a bikepath in Kettering from Jane Newcom Park to Hempstead Station Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~3D4A67BA3FC190BC7011FC14070EC176EAD11205 100771~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: LOR 113 SLM 0.00-2.38, 3.12-4.22, 7.45-9.34~|~05 - 4R Maintenance - Resurfacing~|~94E025326E3E8070ECF7A0A7B0084D76A6D78DAD 100771~|~1~|~2~|~02/S<2~|~STP < 200,000 Resurfacing: LOR 113 SLM 2.38-3.12, 4.22-6.48, 9.34-11.66~|~05 - 4R Maintenance - Resurfacing~|~FFC09DE35940C23FE0F0C61574808FBA1DE545E3 100771~|~1~|~3~|~03/STR~|~Bridge Work: LOR-113-8.46~|~04 - Reconstruction - No Added Capacity~|~340AD7B08D75A2958257C5178D0680E7727741A1 100771~|~1~|~4~|~04/S<2~|~Bridge Work: LOR-113-10.61 (L&R)~|~13 - Bridge Rehabilitation~|~5645ED8213C178727BDCABD66CD3B9F0DD6E4083 100771~|~5~|~5~|~05/S<2~|~Nolfolk Southern Rail Road Construction Engineering Costs~|~17 - Construction Engineering~|~CC132DB99A34E87B770EE5A02A4F6B31263A5F4D 87470~|~1~|~1~|~01/STR~|~100% state funding on the non-NHS routes~|~44 - Other~|~BA4285F607B3AA0882DD57675F7ABCFBC0FD2861 87470~|~1~|~3~|~03/NFA~|~100% local participation for the relocation of county sanitary force main.~|~44 - Other~|~F1C541BB0A141B744EC73C756C38A668C99DC350 87470~|~1~|~2~|~02/NHS~|~Work on the SR-306 locations.~|~44 - Other~|~F4C14788E609AB78B20A2646952E5C283DE82B76 118894~|~1~|~1~|~01/NFA~|~Resurfacing SR 646~|~05 - 4R Maintenance - Resurfacing~|~9640F83138A1FDD2D8CEDFB25DAACF15EAD1E87B 116075~|~1~|~1~|~01/S<2~|~Bridge Replacement.~|~04 - Reconstruction - No Added Capacity~|~66D7F5B4BA35AA2662DC55E95BFF640E2F7CEC45 115162~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr ERI SR 02 00.00 - 01.77 ~|~05 - 4R Maintenance - Resurfacing~|~B8550D04A18AC9823E72B3DD179300DA6F2CD440 115162~|~1~|~2~|~02/BRO~|~Bridge Work to be Determined at a latter date.~|~13 - Bridge Rehabilitation~|~0833C18DA21B4FB5D82B8515F1162EF0449FE2C5 126909~|~1~|~1~|~01/SAF~|~GR project on various routes.~|~21 - Safety~|~72A3DF669857BF2042C489F518F923E19C9AB7E8 120232~|~1~|~1~|~01/ENH~|~Multi-Use at the Norwalk Reservoir - TAP Funding~|~28 - Facilities for Pedestrians & Bicycles~|~C88B81BE4F3414EF8564B924C561A4257535804D 121142~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~213FDCF9054B054E7CF02A0B73024637E0B29C4A 121142~|~1~|~2~|~02/NHS~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~07EA1759B8BB5511BC964FC780D3CE0C2336B038 109256~|~1~|~1~|~01/NFP~|~Add Split - 2019 Operations Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~E90717CE1D328B872BD8B23DA9A3E4A0020326F0 102362~|~1~|~1~|~01/NFP~|~Demolition of three structures and one billboard.~|~44 - Other~|~30538A417CE31070E8FDB99AFE9002AFAD89151F 95459~|~2~|~2~|~02/NFA~|~Replacement of three (3) structures - SFNs 6005349, 6005373, and 6005403~|~04 - Reconstruction - No Added Capacity~|~EC90493A66D9B45BC0F5B318F54C9E4A34BDFBCA 95459~|~1~|~1~|~01/NFA~|~Major rehabilitation of pavement and maintenance of four (4) bridges.~|~04 - Reconstruction - No Added Capacity~|~99306370BDA9BC766718117220A84D13A21C1B88 95459~|~1~|~3~|~03/SAF/TVSD~|~Sidewalk replacement work (MUS SR 208 0.67 to 0.74)~|~21 - Safety~|~A447483C88866F27DE9113221D13410EA3C906FA 96119~|~1~|~1~|~01/STR~|~MAR-37-7.30 culvert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6D9180322EA88CD8203031E01C0FB4A77BD8B75E 93258~|~1~|~1~|~01/STR~|~Remove and replace deck overlay. Patch backwalls, reface abutments with annodes, repair deck edges, encase peir piling patch and rebuild wingwalls on SFN 0603066 AUG 219 0312~|~13 - Bridge Rehabilitation~|~6B09B1758257953B73EDD0D6266A33D964F62FD4 99011~|~1~|~1~|~01/NHS~|~Install left turn lanes on north and south approaches to improve the safety and opertaion of the intersection - 800 feet south to 1100 feet north of the intersection with Nutt/Hibberd - MOT SR 48 1.02 to MOT SR 48 1.41~|~21 - Safety~|~DE192868865EE4F2CF8CEF05069E169EA73245A5 104936~|~1~|~1~|~01/MPO~|~Construction of a multi-lane modern roundabout to replace the existing partial clover interchange of SR-126 with US-22.~|~04 - Reconstruction - No Added Capacity~|~0435423D354D362CC0A31C7854EE44F990205E41 104936~|~1~|~2~|~02/NFP~|~Split for 100% local utility cost. Waterline improvements to accommodate future development adjacent to the project, and moving of utilities underground.~|~43 - Utilities~|~7BFEF2D8007223C871CC00B6B52EA63760B526D2 88612~|~1~|~1~|~01/STR~|~Replace bridge (not BR eligible for replacement)SFN 6502512, PIC-138-5.27, Little Yellowbud Ck~|~10 - Bridge Replacement~|~62A81453A3EE49DF1374DCFF47D3C0C561193036 93196~|~1~|~1~|~01/IMS~|~Crack sealing the existing pavement on MOT Interstate 75 from SLM 18.24 to 24.42 and on MIA Interstate 75 from 0.00 to 4.92.~|~05 - 4R Maintenance - Resurfacing~|~C44D82AAB57E3B1F35439C7D4E799B761A2D5504 110940~|~1~|~1~|~01/S>2~|~Split for Urban Paving work~|~~|~B279A16DF589389F0D5F5E7BCD5E1692C5E5EA1A 110940~|~1~|~2~|~02/S>2~|~Plan split for item that are not eligible for Urban Paving Funds, 100% Local~|~~|~08FBC8A7EA6EC33931B9B1722AA6349B9C1C44FB 117602~|~1~|~1~|~01/BRF/LCEO~|~Replacement of LIC CR 539 0.05 (SFN 4536150) carrying Moots Run Road over Raccoon Creek.~|~10 - Bridge Replacement~|~07DB2D3E07E0F3AB7CE4CF6643CB9E28ACBDDFCC 89303~|~1~|~1~|~01/NHS~|~DEL-23, FRA-33, FRA-104, FRA-161, FRA-315, UNI-33NHS locations for sign replacements~|~21 - Safety~|~C0CF0D0D30EEACBB1C68E2167437DC3071AF5501 89303~|~1~|~2~|~02/S>2~|~FRA-104, FRA-315 STP Columbus area location for sign replacementsFRA-315: 12.45-12.79 (N of I-270)FRA-104: 6.53-8.02 (2 lane portion of SR-104)~|~21 - Safety~|~DBA70CDE2E50DDA27FFB5040E58FF152C67F4CA6 89303~|~1~|~3~|~03/IMS~|~MAD-70 0-15.57FRA-70 0-3.41, 15.24-24.94Sign replacements~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~906D66269304BB5650E1E96C2B5E3A7889099346 89303~|~1~|~4~|~04/IMS~|~Install sign for John Glenn International Airport on IR 670~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DCA3B44B424E029DEE9ED137B5A9C095936BC5DC 126054~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~C5ACFB3D58F58552787AC7CDF361BE24DA55680F 101626~|~1~|~1~|~01/NHS~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~717F6B49485CD3F23B5DE7BBAC3A255ED7FBB243 117001~|~1~|~1~|~01/CMQ/OXF~|~Construction of a shared use path connecting Talawanda Middle and High Schools, and a new regional transit facility on Chestnut Street.~|~28 - Facilities for Pedestrians & Bicycles~|~A51412ABF4A5907BA2C27CEB0E4329C0552BA56F 115754~|~1~|~2~|~02/S5K/TREN~|~Plan split for the 100% City items on the urban paving on BUT-73 ~|~05 - 4R Maintenance - Resurfacing~|~20D1A5E5CADACB15AEFE329E227F4AD6FE7F0549 115754~|~1~|~1~|~01/S5K~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on BUT-73~|~05 - 4R Maintenance - Resurfacing~|~306803E3A2CABFC1544585FF02D2AC30FEA4978B 117373~|~1~|~1~|~01/BRO~|~Complete structure replacement via CEAO BFP (80%) up to Federal Maximum.~|~10 - Bridge Replacement~|~5E6E6FF8F4D3CCD8A55321CDCD2215CFCA99D38E 92971~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-US 40-13.27 to 14.37; 2) Lic-US 40-16.66 to 19.59;~|~05 - 4R Maintenance - Resurfacing~|~EB22B36487CC59203652FEABDEE52337E2708D4D 92971~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Lic-US 40-14.37 to 16.66~|~05 - 4R Maintenance - Resurfacing~|~A6C0DF97B708628181B5A42BEA73DDEE04C65AF4 106389~|~1~|~1~|~01/NHS~|~Urban Paving Split for pavement between intersection from Ford St.(15.61) to Detroit Ave. (18.59)~|~05 - 4R Maintenance - Resurfacing~|~0FB1EB386C4543ACEF9D86ECFA3B72E90F8296EA 106389~|~1~|~2~|~02/SAF~|~Plan Split~|~21 - Safety~|~AFD2D90F3F8268FB232FCAC4BCF587D993FC2E5E 106389~|~1~|~3~|~03/CMQ~|~CMAQ Plans Split for the Bike Trail along US24~|~28 - Facilities for Pedestrians & Bicycles~|~16C391710630B0BB31CDE7C29F127FE86E0285AA 106389~|~1~|~4~|~04/NHS~|~Landscaping & lighting~|~31 - Landscaping & Other Scenic Beautification~|~93CB61AE80659D40CA49F82DA76F508C965C8CE8 111506~|~1~|~1~|~01/STR~|~Slide Repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~90AB58C682BD4945E6A13E3521B0959504B439EB 99602~|~1~|~1~|~01/BRO~|~Repair structure TUS-800-2844 (SFN 7906706) by replacing the existing wearing surface with a rigid concrete overlay, replacing the backwalls, end cross frames and expansion joints. The project will also upgrade the bridge railing, making the necessary modification to the deck edges and structural steel. The existing steel beams will be cleaned and painted.~|~13 - Bridge Rehabilitation~|~0A2F95FDD8CEB0734756FD818EDAC4C7D5079AC9 80105~|~1~|~1~|~01/MPO~|~US23/Penn Ave interchange modification80% MORPC STP & 20% local (City of Delaware) up to funding cap01/MPO/PV/~|~~|~F3A3DE0E23493DFED21B7E8D43EC419F84127149 112731~|~1~|~1~|~01/NHS~|~MAD-40-14.82 and MAD-40-16.10 - structure replacement.~|~10 - Bridge Replacement~|~B6634DFA06BCC528190E1C0D1491231AEE5D8AA2 107363~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2024 and 2025 herbicidal spraying. Funded 100% state.~|~44 - Other~|~AA4797D4AE03115F8DFA95665BC9D1D834EE1ABD 76816~|~1~|~1~|~01/NHS~|~80/20 funding split for all work using major rehab funds~|~~|~9980A6B1F6D80E9691E2D96E732536CEC69C9CA3 115885~|~1~|~1~|~01/SAF~|~Work at SR 309 railroad crossing~|~22 - Rail/Highway crossing~|~7AE3C45AC573268D05366CAA17ACE1CBE3004273 105500~|~1~|~1~|~01/STR~|~Resurfacing various locations, MAD38, MAR 47, MRW 61, PIC 762.~|~~|~63946EC97F643235098D8F417743373D8B521BE9 105500~|~1~|~2~|~02/STR~|~Resurfacing various location, MAD 38, MAR 47, MRW 61, PIC 762.~|~~|~00AA7BA1C6902099FC4786C4922CB9F242F25AAD 105500~|~1~|~3~|~03/NHS~|~Resurfacing US 23~|~~|~BC5F702E28F679D95CE4312622139B6AC8BE9F43 105500~|~1~|~4~|~04/NHS~|~Resurfacing US 23~|~~|~594EB9CD833061F6BFCA0FE239DE2660F1522308 100936~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D3A033EB9237F1C16958EC87B3D68B96CAC6A993 100936~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~ECD8E0FE1A160118A231C70157A270B5C6296D72 114496~|~1~|~1~|~01/S>2~|~This plan split covers all work associated with the construction of the multi-use path.~|~28 - Facilities for Pedestrians & Bicycles~|~B19666F5F9C7BCF443B69E88E23043AFDEEAA688 105277~|~1~|~1~|~01/STR~|~Resurfacing of HAS-519 and HAS-646~|~05 - 4R Maintenance - Resurfacing~|~BE2E449D2D005D36A021196DC28522C7F286DD1E 100293~|~1~|~1~|~01/IMS~|~Microsurfacing of SUM IR 271 from 8.54 to 10.91~|~05 - 4R Maintenance - Resurfacing~|~1F5AB34D4A02CB9D11BA6D6F7D9367495CFF83C2 100293~|~1~|~2~|~02/NHS~|~Double Microsurfacing of SUM SR 59 from 8.42 to 9.51~|~05 - 4R Maintenance - Resurfacing~|~32813D359B15772C1B31A99DF6B35D93F1B4A397 100293~|~1~|~3~|~03/S>2~|~Double Microsurfacing of SUM SR 8 from 19.04 to 19.22 and from 19.45 to 20.27.~|~05 - 4R Maintenance - Resurfacing~|~AEFD4D47285370F7A2787A04D0443AA0AE98EE27 100293~|~1~|~4~|~04/S>2/MACE~|~Double Microurfacing of SUM SR 8 from 18.58 to 19.04 and 19.22 to 19.45, urban paving 80/20 items in the City of Macedonia.~|~05 - 4R Maintenance - Resurfacing~|~B5176E8DF1F94867D9300C3CD302699F4E741DC8 95193~|~1~|~1~|~01/BRF~|~SFN 2635070, structure on TR-25 over Flat Run~|~10 - Bridge Replacement~|~1829594C712D90B5A83B49CB8DDAA3CF292F10BF 95174~|~1~|~1~|~01/SAF/LCEO~|~"01/SAF/OT/LICK" County Engineer's Association Organization Pavement Marking 4HB7(100% Federal) - CAP of $150,000.00 federal - Pavement Marking on routes to be determined~|~21 - Safety~|~C24A61ABDF8FCF3F9A2BD9EBCB9C375ADBC14FFA 112130~|~1~|~1~|~01/SAF~|~Funding split for safety related items~|~21 - Safety~|~62877D52A72CEC92E41F9E4B6C8DA2E8F686E467 82836~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 4302400~|~10 - Bridge Replacement~|~92736975595BA904AB4ABA22ED8A9AA5A12A4A3E 92321~|~1~|~1~|~01/S<2~|~Bridge rehabilitation on ATH-682-2.14, SFN 0504742. Work includes backwall repair, approach slab, and expansion joint replacement. Funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~A4770E4B105AC58CF95614023596B97F904306D0 107657~|~1~|~1~|~01/SAF~|~Plan split for TSMO work~|~21 - Safety~|~F0C397834651FDB987C9465761DF3BF43A1E6DA5 103920~|~1~|~1~|~01/STR~|~Culvert Replacements: WAY-301-4.50 / WAY-604-20.65~|~04 - Reconstruction - No Added Capacity~|~7F5CA698DD1FA63D7745FFDB058A6041F6105F33 108640~|~1~|~1~|~01/SAF~|~Install a Restricted Crossing U-Turn (RCUT) at the intersection of US Route 42 and Spring Valley Paintersville Road.~|~21 - Safety~|~76B73B8062F8A33AFB26323D76B1CC9670C51E5E 90388~|~1~|~1~|~01/MPO~|~Major widening of Hamilton Road in Gahanna~|~03 - Reconstruction - Added Capacity~|~0FFFEBB32AFAE71F69E1D4E52857F617B5638FC8 103113~|~1~|~1~|~01/NFA~|~The Village of Columbus Grove proposes a new northbound turn lane on SR65 at Progressive drive along with an upgrade of the corner radii at the intersection. Additionally eastbound left and right turn lanes need to be marked to better utilize the existing three lane pavement on Progressive Dr.~|~01 - New Construction~|~79A4CEBD61072E5D912525E0BD564143B2BBCC49 113183~|~1~|~1~|~01/STR~|~Placeholder until project is scoped and locations are identified.~|~~|~C18528F10820AD22C7C24973E9A00AD977F76FEF 98225~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on various OFAH-Rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~89652A0EFDE7EB94D64803C71081C59FEF4606F3 98225~|~1~|~2~|~02/IMS~|~District Preservation Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on Interstate Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~37143A2113B61D51BD29641609DA51D591F8347F 98225~|~1~|~3~|~03/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on various NHS routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DEBF0B2DA75C89715F1D9D5B229F27DCC9C0BB1F 98225~|~1~|~4~|~04/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5B4057D3893CDCD664A5BD0D4A7228FEE74ED4E0 95530~|~1~|~1~|~01/MPO~|~MORPC & ODOT funding for 11 traffic surveillance camera upgrades at:33/317, 33/Gender Rd, 70/Courtright, 33/Post, 161/Little Turtle, 161/Hamilton, 270/McCutcheon, 315/Town, 315/Ackerman, 315/670WB, 70/Mound~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDC7678E5E12015BF21CF253E14E08B2489BCB90 95530~|~1~|~2~|~02/MPO~|~MORPC & Columbus funding for traffic surveillance camera upgrade~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DAAE4D7D2E972A063AACBA8460B314527A198899 95530~|~1~|~3~|~03/SAF~|~100% 4IS7 funding for new fence gates at 71/Hudson and 71/Weber~|~21 - Safety~|~70863FFA3460976AC2989F4C85C12A698F06003B 122494~|~1~|~1~|~01/S50~|~Roadway minor rehab utilizing Oil & Shale funds at 100% up to the State maximum.~|~05 - 4R Maintenance - Resurfacing~|~2CFD6871288D81C88A5C4D9D82701D2B0431159A 80021~|~1~|~1~|~01/NHS~|~ROS US23 0.00 - 8.39 Resurfacing Project Project Termini: Pike County Line north to 0.05 mile south of intersection with SR104 Project Description: It is proposed to resurface a portion of US23. Brdg to be paved thru:7100094 ROS US23 0.75 Intersect: Crooked Creek7100167 ROS US23 1.47 Intersect: George Hollow Run7100191 ROS US23 1.64 Intersect: Stream7100302 ROS US23 7.7 Intersect: Indian Creek80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~7CD640D3BEE54CF59A86E81DAB1789FF82E4EF38 80021~|~1~|~2~|~02/NHS~|~ROS US23 0.00 - 8.39 Resurfacing Project Project Termini: Pike County Line north to 0.05 mile south of intersection with SR104 Project Description: It is proposed to resurface a portion of US23. Brdg's for rehab.7100035 ROS US23 0.39 Intersect: Crooked Creek7100124 ROS US23 1.09 Intersect: Crooked Creek7100213 ROS US23 4.9 Intersect: Indian Creek7100272 ROS US23 6.74 Intersect: N Branch Of Indian Creek80/20 split01/NHS/BR/State~|~13 - Bridge Rehabilitation~|~964C32633BF0196DA641FC3182391B4F2704D9B7 117541~|~1~|~1~|~01/NHS~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~2A2D557FAE4BFC3BD8433C1740FFC0B46C10049B 119859~|~1~|~1~|~01/SAF~|~Plan Split for Safety funded scope to enhance crossings and add new sidewalks.~|~21 - Safety~|~EDF0A81BC440E5FAC29E9E1E98AE7E7D61CC096E 119859~|~1~|~2~|~02/S5K~|~Small City funded scope for roadway reconstruction~|~04 - Reconstruction - No Added Capacity~|~F1CF7EEC61F53DD70AAC2B12AA5AC293C2B2BF49 119859~|~1~|~3~|~03/S5K~|~Plan Split for Urban Paving funded scope~|~05 - 4R Maintenance - Resurfacing~|~F94B66D513387ACAD2D96D658DCAE1C7BF5FEF70 112816~|~1~|~4~|~04/STR~|~Minor bridge rehab 10' to 20' span.~|~~|~05C4B720E6B7E43737AA0DD49C954D1F5ABF18C0 112816~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~0940AF3C3FF1E86A56B25E7AEDB94F38003F9B69 112816~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~10FF1D2FBCEC01B6D553F8F089E1070284FA440C 112816~|~1~|~3~|~03/S5K~|~Minor bridge rehab 10' to 20' span.~|~~|~F157E95EB6EE1523B8584848CB13FCEAA06D6D10 88315~|~1~|~1~|~01/CMQ~|~ Project involves the widening of Grange Hall Road to three (3) lanes, including the construction of a widened shoulder, bikeway, curb and storm sewer. Project will meet the existing three (3) lane pavement section just south of Gardenview Drive, and will terminate at Kemp Road in the City of Beavercreek~|~21 - Safety~|~19CCDEFD242ADF74FFF9D37AFD92AE643609F51F 122691~|~1~|~1~|~01/CMQ~|~Plan split for signal upgrades utilizing CMAQ funding.~|~21 - Safety~|~F538A72445EBA39658C12B53157020D2A48F4B46 121542~|~1~|~3~|~03/S>2/YOUN~|~Resurfacing, urban paving in the city of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~38FC9710C67CC3793CE002060C036BE28B112C51 121542~|~1~|~4~|~04/S>2/CAMP~|~Resurfacing, urban paving in the city of Campbell.~|~05 - 4R Maintenance - Resurfacing~|~209620840A0E9B5F422A30DD4E78CD800DBCB188 121542~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8E65FD9028175070037F21002B23EF3311DD90AF 121542~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F95330C6B5E4A8F4E6C55D4EB5AFA44C824CE684 121542~|~1~|~5~|~05/S>2~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~AAAB6D235D00BF4C8756704A5DA4585D58CC6476 110021~|~1~|~1~|~01/NHS~|~Pavement Plan split~|~05 - 4R Maintenance - Resurfacing~|~22E8A91A5FDCAA18FA3F756A1E222D11DC74D445 93079~|~1~|~2~|~02/IMS~|~This Plan Split is for the pavement work inlcuded in the project. Work is on mainline I-74 and all ramps at the interchange.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B16398F2048FE3789DEB6DECEC55A911F6F116D2 93079~|~1~|~1~|~01/IMS~|~This plan split is for the replacement of bridge HAM-74-1466 (SFN 3108708) North Bend Road over I-74. This plan split includes the necessary pavement work on North Bend road needed when raising the bridge.~|~13 - Bridge Rehabilitation~|~CDD6072B8FD30EE470FAC33D51686CBE1592D5F4 93079~|~1~|~3~|~03/IMS~|~Plan Split for Vandal Protection Fence and bronze plaques. ODOT funds are capped on the VPF. Green Twp to pay for anything over the ODOT Cap amount and for 100% of the cost for the bronze plaques.~|~13 - Bridge Rehabilitation~|~7665321651E3DC8EEB7159E06DBF116D03921319 93079~|~2~|~4~|~04/IMS~|~This plan split is for the slide repair at the Westbound offramp to North Bend Rd. (Part 2, associated to PID 101450).~|~04 - Reconstruction - No Added Capacity~|~0A699B4787B1DFF231072BEABEC0D5171A807A54 105724~|~1~|~2~|~02/STR~|~Reconstruction of overhead flashers at US-6 & SR-46 and SR-7 & SR-84~|~21 - Safety~|~29FBA029A962E74671028E3FAC27A83AC1D573FF 105724~|~1~|~1~|~01/NHS~|~Installing signal at TRU SR 11SB and Tibbetts Wick Road.~|~21 - Safety~|~E5EDD13447A0BDE0093E2ACA7250441AC70285B7 113310~|~1~|~1~|~01/MPO~|~work eligible for federal-aide.~|~05 - 4R Maintenance - Resurfacing~|~E37E70021BA39CC3BA2422E05C9A49A6394A98B3 84478~|~1~|~1~|~01/NHS~|~Dsitrict Wide Pavement Preventative Maintenance project for FY2014 on CLE 125 from SLM 8.95 - 14.09 which is 100% NHS~|~99 - State Preventative Maintenance~|~E1AB5B749331F1DDFECD20B3811A4431F2179B09 101287~|~1~|~1~|~01/STR~|~WOO-64~|~~|~B6161A6E99C90CBDAD2D163E7D67C728256E2B44 97153~|~1~|~1~|~01/NFA~|~Stark County Engineer~|~10 - Bridge Replacement~|~5216999DA0924C4A462F0AB564D891A06F9C4131 109864~|~1~|~1~|~01/STR~|~Overlay in ADA~|~05 - 4R Maintenance - Resurfacing~|~7D06B78BF7B5A46BEC08C980BEABE0210D373EB4 117881~|~1~|~1~|~01/IMS~|~Split for work funded with Major Rehab~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D8ED5F932086FF93AE02B8991758021183BE59F5 117881~|~1~|~2~|~02/IMS~|~Plan split for bridge work within corridor~|~17 - Construction Engineering~|~46B8CDF7DC9CCF197B2388394C81A0E61EDA9D44 111590~|~1~|~1~|~01/NHS~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~11064E73B53FC99A23ED950B1366A1945C0BC9C2 106928~|~1~|~1~|~01/IMS~|~Project is to remove and replace the damaged acrylic noise wall panels along I-75 in Dayton. Panels were damaged as a result of an accident and ensuing fire.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~552B292F3E9A6BF56DC95F9318E05BCADF637249 117816~|~1~|~1~|~01/NFP/GPHC~|~Resurfacing with partial and full depth replacement of park drives and parking areas in Embshoff Woods Park.~|~04 - Reconstruction - No Added Capacity~|~C59977F5E7EB3DCA72FA5905D69569397194764D 117816~|~1~|~2~|~02/NFA~|~this is a plan split to cover the sidewalk which can not be paid using Metropark funding~|~28 - Facilities for Pedestrians & Bicycles~|~1866E47C82C70AD59BEBA32EE6F038F11567D0FF 82286~|~1~|~3~|~03/IMS~|~Plan Splt for MSD work included with the project. All items are 100% MSD.~|~43 - Utilities~|~280A294712196F6BC9E3256D3EB90E785792F5F7 82286~|~1~|~2~|~02/NHS~|~Phase 7 of the HAM-75 Corridor Projects. Reconstruct I-75 from north of the Mitchell Avenue interchange through the SR 562 interchange. The SR 562 ramps servicing SB I-75 shall be reconstructed. Mainline work should end north of Bridge No. HAM-75-0791 carrying I-75 over the I-75SB to SR 562 EB Ramp.~|~03 - Reconstruction - Added Capacity~|~A5182C7B1B66D17986575078283EDA1819CCDC69 82286~|~1~|~1~|~01/IMS~|~Phase 7 of the HAM-75 Corridor Projects. Reconstruct I-75 from 0.4 miles north of the Mitchell Avenue interchange through the SR 562 interchange. The SR 562 ramps servicing SB I-75 shall be reconstructed. Mainline work should end north of Bridge No. HAM-75-0791 carrying I-75 over the I-75SB to SR 562 EB Ramp.~|~04 - Reconstruction - No Added Capacity~|~FB179E33B4EA18702FBEBEE73F8EC65F14469D6F 124420~|~1~|~1~|~01/SAF~|~Realign WAS CR 11 with SR 555 to improve sight distance.~|~21 - Safety~|~B579A7D9C4CB3C8D6EB71B5EBF1910EBE1E0E271 112650~|~1~|~1~|~01/IMS~|~Repair culvert carrying IR 70 over Post Boy Creek by field paving the invert.~|~04 - Reconstruction - No Added Capacity~|~8D2EB38D0A746A7FE5C39EC4936D0E389DAE1F32 110433~|~1~|~1~|~01/S>2~|~Resurfacing of Applegrove St from Marquardt Ave to Market Ave (SR 43).~|~05 - 4R Maintenance - Resurfacing~|~FEBCB5F8B2A2CBDF0AEB94F89E0170EA3EDF987F 87026~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping.~|~21 - Safety~|~3CD621B747E7292D1F3CD9285F7F853DD3CACE8B 109091~|~1~|~1~|~01/SAF~|~Implementation of multiple pedestrian related improvements identified in the City of Eaton Community Schools School Travel Plan including construction of curb bump outs, installation of new signage, and application of high visibility crosswalk markings.~|~28 - Facilities for Pedestrians & Bicycles~|~BB94D4E745ABEC2DEA523472A8221E2F40C8D7E2 126669~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~235F93A033C14C033DA8861DC3907A6967FD3F7B 116950~|~1~|~1~|~01/IMS~|~WOO-75 pavement split~|~04 - Reconstruction - No Added Capacity~|~3750A515F17A9F95E2A4295FF0EA68CC37D1F581 97722~|~1~|~1~|~01/BRO~|~Structure over Scioto River replacement~|~10 - Bridge Replacement~|~7FEACC9DC10AD800895EAE893F2A7CDB9167CEE1 76335~|~1~|~3~|~03/S>2~|~Resurfacing of United States Route 30 from SLM 18.75 to SLM 19.16, in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~15DBF192F95A5B69F936EFEC46E6561DB8395A69 76335~|~1~|~1~|~01/NHS~|~Resurfacing of United States Route 30 from SLM 16.46 to SLM 18.48, in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~41973010D5AA5417FF9E42956FFC30D9A9C55354 76335~|~1~|~4~|~04/NHS~|~Minor bridge work to the following sfn: 7601069, 7603673, 7603681, 7601077, 7603738, 7603746.~|~13 - Bridge Rehabilitation~|~5F640B9635B25C53E48A28E2FF99046F8E933CD9 76335~|~1~|~2~|~02/IMS~|~Resurfacing of United State Route 30 from SLM 18.48 to SLM 18.75, in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~76BCDD200F399CCBBBFA39580918EE7A1F0BA9AA 103853~|~1~|~1~|~01/ENH~|~Multi-use path trailhead, pavilion and parking for Gasholder Building.~|~28 - Facilities for Pedestrians & Bicycles~|~0A9254B25C80A16661C6A5F7312B389CBF89FCBD 116946~|~1~|~1~|~01/NHS~|~Major Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~25BDB0E4E9E4DCD4B001B875D39A406E36E0A484 116946~|~1~|~2~|~02/NHS~|~Costs for the Upgrading the existing luminaries to LED on the for the bridge traffic lighting which is owned by the City of Lorain.~|~13 - Bridge Rehabilitation~|~707D11FA033474DBBAE537E4AEA55DAD4C1C98D6 116359~|~1~|~1~|~01/SAF~|~Construct roundabout at intersection of FRA SR 665 and Lambert Rd (FRA CR 291)~|~21 - Safety~|~C1C46E2575A2F5EE81FC20C240DA3AD577AEB2B1 116359~|~2~|~2~|~02/STR~|~Construct sewer and culvert~|~04 - Reconstruction - No Added Capacity~|~F4337740FF15327212D8030B41B9669190F6331F 100737~|~1~|~1~|~01/IMS~|~Spot concrete slab repair on interstate system.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~94603B490E285DA73AB013ACEB4AF0CE62CC47BF 100737~|~1~|~2~|~02/STR~|~Spot repair on MAD 42 from 12.35 to 13.43~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9CD8026A7AB6A42E60092C1B470DC2CC7E826816 110698~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~6A677347F74F2CB820C6E109BE97C9C9870D63EB 110698~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7A3A60B3A07551DCEDE062FAFEF6F598EB1769F9 110698~|~1~|~2~|~02/NHS/TWIN~|~Resurfacing, urban paving in the City of Twinsburg.~|~05 - 4R Maintenance - Resurfacing~|~CA1D923D10F23E63B17A3DF6B55F4A487CEEEBEF 110698~|~1~|~4~|~04/NHS/TWIN~|~100% Twinsburg items including partial depth repairs, manholes and catch basins reconstructed to grade.~|~04 - Reconstruction - No Added Capacity~|~DE3A801791FDB948EED2DFF55D267992B44B6610 110698~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~C89596E5944967252220C4B5887D4BEA14D92846 115895~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~13 - Bridge Rehabilitation~|~A6AEEFDAF8AFCA2B1190C4CE2EEB302CA3AADCBB 115895~|~1~|~2~|~02/BRO~|~Plan split for work to address scour countermeasures and utilize Protect funds~|~66 - Resilience Improvement - Highway Project ~|~D08ABE19827260927A3053945AAE036AB1BE2673 104925~|~1~|~1~|~01/NFA~|~Norfolk Southern Anti-idle project~|~44 - Other~|~0B59821F358B87B79A738B4B3A997937D705ED00 122106~|~1~|~1~|~01/NFA/GUE~|~Guernsey County CEAO Federal/State Exchange Program Funding - 4C87 (80% State) / LNTP (20% Local Match) - Replacement of SFN 3034968 carrying over Leatherwood Creek~|~10 - Bridge Replacement~|~9802A8781443F4E8205FD98B032EF50E92A3BDEA 111517~|~1~|~1~|~01/IMS~|~Slope repair adjacent to the WB rest area~|~~|~4B5D8D4BD4745CE0963B2C23A76223E3686B3DFA 107358~|~1~|~1~|~01/STR~|~Culvert replacement. Locations TBD.~|~04 - Reconstruction - No Added Capacity~|~44C471D5702A7AFEE33CC8A92E3ECB8FEB03E5E3 119141~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 18.70-25.39 and MEG 33 0.00-4.09. Funded 100% State.~|~03 - Reconstruction - Added Capacity~|~D8345441B0C8D1D211CE2EA4033A7F2590E83870 119141~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 18.70-25.39 and MEG 33 0.00-4.09. Work on the existing lanes. ~|~04 - Reconstruction - No Added Capacity~|~A545B259BFACAFBEA2DB1AF84B48F5FA50B79635 119141~|~1~|~3~|~03/NHS~|~Construction of 2 new overpass bridges on ATH 33. ~|~08 - Bridge - New Construction~|~185FBB205698068689A3A9B2783093E93D1A2451 100577~|~1~|~1~|~01/BRO~|~Replace existing box culvert bridge carrying SR 14 over Branch of Stone Mill Run.~|~04 - Reconstruction - No Added Capacity~|~7EE9F4FB065A05873C737BA92287657E54CEA8AB 119232~|~1~|~1~|~01/S>2~|~Plan Split for guardrail work/repair in D8~|~21 - Safety~|~05440CE41281236EE27C5BF4DAC2BD0DCF2BE560 104829~|~1~|~1~|~01/S>2~|~Trail maintenance throughout the City of Springfield.~|~28 - Facilities for Pedestrians & Bicycles~|~B92A161A7F0279755FBB1F682272C6E842E3CAC1 84717~|~1~|~1~|~01/STR~|~Overlay US 42 and SR 41 in Clark County; Village of South Charleston:CLA US 42 SLM 5.26 to 6.29CLA SR 41 SLM 3.63 to 4.99~|~05 - 4R Maintenance - Resurfacing~|~1BE854A68F88719B71EDD4EF80AFB4CCB9128041 121375~|~1~|~1~|~01/NFP~|~FY30 Design Holder~|~44 - Other~|~AD7E5ADC5DC8CDFA9E790F0E16ED4A84E308D701 116854~|~1~|~1~|~01/CMQ~|~Intersection improvement.~|~04 - Reconstruction - No Added Capacity~|~B0415F928E74AEBDBFD6DA77AA83934843CA19CB 100367~|~1~|~1~|~01/NHS~|~This split is for resurfacing with federal NHS funds with a 20% State match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~89919DDC4D5AB612E1DCA1D3CCEE999AFA8F7D2F 100367~|~1~|~2~|~02/S<2~|~This split is for resurfacing with federal STP funds in the Ottawa-Glandorf urban area using funds from the District preservation program. There is a 20% state match. There are no local funds in this split.~|~~|~4E1EEF1490EEA9064E82A754E81BF5C61406A683 100367~|~1~|~3~|~03/STR~|~This split is for resurfacing with rural federal STP funds with a 20% State match. All funds are from the District Preservation Program. There are no local funds in this split.~|~~|~440CCAD6718CC8305277BF98D72B28326B9FDE88 108498~|~1~|~1~|~01/MPO/NORT~|~Resurfacing of Wooster Rd from SR 21 to Norton East Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~C6C93BB03EF7FD057A72DEBF4F0A7C86333A2567 100013~|~1~|~1~|~01/IMS~|~100% state funded split for pavement work~|~99 - State Preventative Maintenance~|~BA0266E2DDFDC7CE343A166E8A2FFB70094206D3 100101~|~1~|~1~|~01/NFP~|~Split for lighting work.~|~44 - Other~|~DBE8C9976B786C8BFB819365293492982AB7548D 122023~|~1~|~1~|~01/S5K/GAMB~|~Multimodal safety improvements in the Village of Gambier.~|~28 - Facilities for Pedestrians & Bicycles~|~95A7654F727288B82CE1071418E43CABB23C1FEA 119727~|~1~|~1~|~01/IMS~|~Geotech Repairs along RIC IR 0071 15.79.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~10C5ED67393EA1BC83B8E9670B230ECE76A65933 109237~|~1~|~1~|~01/STR~|~Culvert Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~912D1CB306A237BFEEE094B37C8201FE4AC802C8 114109~|~1~|~1~|~01/ENH~|~RCRPC funded sidewalk project in the Village of Bellville~|~28 - Facilities for Pedestrians & Bicycles~|~AB29F238B677549295520D1C15B1DE21274861D3 114109~|~1~|~2~|~02/ENH~|~On-Going Services (KEM)~|~17 - Construction Engineering~|~9CFF2D230D320AD94292DD494F749486F9B2EF95 99804~|~1~|~1~|~01/CMQ~|~Construction of Phase 4 of the Western Reserve Greenway Bike Trail in Trumbull County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~E83CB3C6BE1770D03E9CC7A48859DA21BCC54B47 117575~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items~|~28 - Facilities for Pedestrians & Bicycles~|~CE465635ECF4B0F174C269E5AB0DC4B88615074A 121310~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~182EEDBE7AC501CCFE7439B395EAC064B80FDDD2 121310~|~1~|~2~|~02/NHS~|~local plan split.~|~05 - 4R Maintenance - Resurfacing~|~02F5C7A76EF133C74D8B78A06F7D5147F0F5CBFA 105291~|~1~|~1~|~01/STR~|~Resurfacing JEF-164~|~05 - 4R Maintenance - Resurfacing~|~7C1BAA304530D8BB2AC9BC0F7A503E6A5A5392C0 118922~|~1~|~1~|~01/S>2~|~Conduits linked~|~~|~B548253B13FEAAE6B520A09164EE088E22D55268 101209~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split 1 created for the following STP Rural routes: MRW-97-0.00-5.94 MRW-288-0.00-6.82~|~05 - 4R Maintenance - Resurfacing~|~5876AA997A366AB16F78ED025DDEB0C15343A44F 101209~|~2~|~2~|~02/IMS~|~CO CO Contr 02 plan split 2 created for the following Interstate routes: MRW-71-19.53-19.92~|~05 - 4R Maintenance - Resurfacing~|~212F40EFF1D5A85AC7A697030F716BB2A979F3F8 105557~|~1~|~1~|~01/NHS~|~FRA-317~|~05 - 4R Maintenance - Resurfacing~|~822C014B6C3B295AB6A79E4455B6DCD16C01BF18 105557~|~1~|~2~|~02/S>2~|~DEL-745~|~05 - 4R Maintenance - Resurfacing~|~165F17FE536802132DE37DDF3C4D25D18EAA4330 86724~|~1~|~1~|~01/STR~|~Resurfacing~|~~|~35902E1D02060CCD59E3952E0E5024F7796909A6 86724~|~1~|~2~|~02/STR~|~Bridge Repairs~|~~|~DA8E438DC035550D5120A6799B447D3AA558867E 90251~|~1~|~1~|~01/NFA~|~HIG TR 250/Various GR 2013On TR250 from 0.00 to 2.02, it is proposed to replace the guardrail at various location.CEAO 100% safety funds01/NFA/OT/HIG~|~21 - Safety~|~9CA7C9CE1E92C055C8F24EE0568D8E76F9149108 120379~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C4966D3DCF7A7C2AB890119AB28AE0812D5EBD92 103852~|~1~|~1~|~01/STR~|~Permanent repair of slip on PIK CR50 1.95 (DSR# PIK-001)~|~04 - Reconstruction - No Added Capacity~|~DF6DB00C8AE20B3CE6F28BF4D02EA1C1E61A5B34 109913~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~03BC5F683146E13D7F4C2AC09AF931BA62932E74 98307~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair in Franklin County~|~44 - Other~|~CA5FD777DACE8845377FE1236AACF10EEC7B1E38 103989~|~1~|~1~|~01/ENH~|~Construction of sidewalk along GAL 325 6.68-6.87 in the Village of Rio Grande. Total length of project 0.18 miles. Funded 80% federal, 15% credit bridge, 5% local.~|~28 - Facilities for Pedestrians & Bicycles~|~6DBF69447BE5F7C88924757AA40F996B878A63CE 100425~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 1.56-3.68. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~91BB35988E7315EE34521F3AB3AB6FDFB760A9E2 100425~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. WAS 821 0.60-1.56. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~F20514F29B630676399310F531BCF07E796E5434 101429~|~1~|~1~|~01/STR~|~STP Rural Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~AD6ACB4606C82C107A5F45D60BC035F10170E949 114830~|~1~|~1~|~01/NHS~|~DEL-23 from 14.37 to 17.75~|~05 - 4R Maintenance - Resurfacing~|~A42CB5F717933CA686FA20C685F63CD3F2E47AA0 124366~|~1~|~1~|~01/SAF~|~Install new signals on SR 7/I-90 Ramps.~|~21 - Safety~|~70803CF47B7CB5C79003D0C1C71ED433A42D40E4 124366~|~1~|~2~|~02/SAF~|~New signal at SR 45/I-90 WB.~|~21 - Safety~|~3BDA35DB9CDB97868585229DBDE3FC5652A55041 97392~|~1~|~2~|~02/S<2~|~Culvert replacement project. HOC 216 0.00. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~081D09AA08DAC5360458EE014980A82BDD8115CD 97392~|~1~|~1~|~01/NHS~|~Culvert replacement project. HOC 78 3.20. NHS route funded 80 federal/20 state.~|~17 - Construction Engineering~|~85163338060CD9628E801E43028C31AFE0CBF645 112756~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing of S Chestnut St from Lake Ave to Main St and Riddle St from Meridian St to Liberty St, in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~1A7065755CABA9701AC147627C4BEDDF9BC2E706 105334~|~1~|~2~|~02/S<2~|~AC overlay without repairs on Small Urban route: SHE SR 29 SLM 20.35 to 20.95.~|~05 - 4R Maintenance - Resurfacing~|~3CAFBD60C30277C4794E81ED93BE797F53316BA0 105334~|~1~|~1~|~01/STR~|~AC overlay without repairs on rural route: AUG SR 29 SLM 9.67 to 10.95~|~05 - 4R Maintenance - Resurfacing~|~83782BE1116E0943DAC5BC0AD2C671BF31BFBB32 96486~|~1~|~1~|~01/NFP~|~Split~|~44 - Other~|~10CE9F342A8463C1412D7B57B461F8427B7232DA 88961~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3000451 GUE US22 20.9 Intersect: Us 22 Over Ditch; BR Eligible for Replacement: Length=23 SD/FO(1) SR=45.3 DSR=6~|~10 - Bridge Replacement~|~6699276EACA003A60CC45657899D9D2EA78E3DD6 88961~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation - 4PS7 (100% State) - No CAP - Relocation of TR 6756 from the 00.00 to th 00.02 to improve site safety at the location.~|~04 - Reconstruction - No Added Capacity~|~B166A2B0C9E006630A1B71EA8D8A0E0B6BE00B36 124359~|~1~|~1~|~01/IMS~|~Plan split for all work on project~|~03 - Reconstruction - Added Capacity~|~E2149622331B0306DF8F12CAE0930CFD9359936A 117562~|~1~|~1~|~01/SAF/GCEO~|~Construction of a roundabout at the intersection of Fairground Road (CR-20) and Hilltop Road (TR-73).~|~21 - Safety~|~9BD0154A62E3E3D5A19A8B704D4657E06784C333 126450~|~1~|~1~|~01/MPO/BARB~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C9BC35A1C5434BCC2910B38A842B09F116D44AB6 103821~|~1~|~1~|~01/SAF~|~Work eligible for Highway Safety funding to improve the safety and traffic flow thru the interchange.~|~21 - Safety~|~4128E3B6E2BB54D62EC8D432AFCB3AA0D0C65558 103821~|~1~|~2~|~02/SAF~|~Work items that is eligible for Active Transportation Infrastructure funding sponsored by the City of Cleveland.~|~21 - Safety~|~4E4C27E892122712307044E7F4E72D5E3D0F0C22 125792~|~1~|~1~|~01/SAF~|~Multimodal Improvements in the unincorporated New Bedford~|~~|~F597FD5179CCA2BA28825F42E34C4E4B77CFE563 99590~|~1~|~2~|~02/IMS~|~IM funding for 2 structures (not BR eligible) SFN 2402009 FAY-35-3.64 L over IR 71 SFN 2401991 FAY-35-3.64 R over IR 71~|~13 - Bridge Rehabilitation~|~4F306AF20563782018F685450B173E2753A23B8A 99590~|~1~|~1~|~01/NHS~|~Repair and structural overlay of FAY US 35~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6E0DB78DC14E6200B8702C0F85A556038EEFAC61 99590~|~2~|~3~|~03/STR~|~Resurfacing CR 38A from Washington CH corp line to SR 238~|~05 - 4R Maintenance - Resurfacing~|~582F53F00C7AF185E72D291B6EC0AC626BB64B6B 121930~|~1~|~1~|~01/SAF/ASD~|~Install 1 mile of 6? sidewalk on the north side and 11? Shared Use Path on the south side of US-250 from Sugarbush Dr. to CR-1575.~|~28 - Facilities for Pedestrians & Bicycles~|~1BFDEF783A2DF027E17FA8A3D9ADD8DF64EEBF6B 121930~|~1~|~2~|~02/SAF~|~setting up split 2~|~21 - Safety~|~926668173FF8239E2DE574383B356CDF1BB30FC4 114659~|~1~|~1~|~01/IMS~|~Project to repair bridges HAM-275-0034 over US 50 and railroad, HAM-275-0312L/R over Whitewater River by drilling out-of-plane bending cracks and welding stiffeners to the girder flanges. The HAM-275-0034 bridges will also be painted.~|~13 - Bridge Rehabilitation~|~63690ED1F834821D4CA1CC2AC42242D8F215A945 116219~|~1~|~1~|~01/S<2~|~Planing and paving utilizing 4B97 Federal funds at 95% ($903,110 maximum).~|~05 - 4R Maintenance - Resurfacing~|~071B747171B4D5C51CC9A6243D6188058CE86734 122942~|~1~|~1~|~01/NFP~|~All bridge hit repair work included in this split.~|~13 - Bridge Rehabilitation~|~00678FD37CF8FB4630FD7C284794B2090F71DF3F 119336~|~1~|~1~|~01/IMS~|~Plan Split for Priority Spot Repairs~|~05 - 4R Maintenance - Resurfacing~|~A247048175C7156F37E95974ECDA11068EEA47C2 115980~|~1~|~1~|~01/MPO~|~Widen TR 179 Logan County Jefferson TWP by two feet~|~21 - Safety~|~3FE296AABCA2D4A7A0D056C9BEF51C62FAE217F9 101189~|~1~|~1~|~01/BRO~|~All work to replace this bridge deck is in this split. Federal and state funds from the District Preservation Program Budget.~|~13 - Bridge Rehabilitation~|~C37414582ADEA29CF7F5896C333A39D47A3881FA 99708~|~1~|~1~|~01/NHS~|~Repair collision damage to bridge BUT-27-0080R bridge that carries US 27 over SR 128. Repair will involve heat straightening, painting, crossframe replacement and sign replacements.~|~13 - Bridge Rehabilitation~|~B3BCC5E4C962C45A0EA999025B183AD18712E6CD 89245~|~1~|~5~|~05/S<2~|~"05/S<2/OT/ " = District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on LIC SR 79 16.25-16.87~|~05 - 4R Maintenance - Resurfacing~|~2F05BE139E35B5D64D5816DFF623CC5EA3C73F89 89245~|~1~|~6~|~06/STR~|~"06/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markings on LIC SR79 16.87-33.1~|~05 - 4R Maintenance - Resurfacing~|~4236B35988F3E924DA36A3C1BCC54BD5685C86C5 89245~|~1~|~4~|~04/S<2/NEWA~|~"04/S<2/PV/NEWA" - Local Funding 4BG7(100% City of Newark) - No CAP - Resurfacing on LIC CR805 0-0.11 and any 100% items requested by the City of Newark~|~05 - 4R Maintenance - Resurfacing~|~435D6BD86006426901547B38F22500531B2FDAB2 89245~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " = District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on LIC SR79 16.25-16.87~|~05 - 4R Maintenance - Resurfacing~|~59B6C9EB80F8A36D08412FF984C77F5AD680223C 89245~|~1~|~3~|~03/S<2/NEWA~|~"03/S<2/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving on LIC SR79 15.66-16.25~|~05 - 4R Maintenance - Resurfacing~|~AC776BF22A9B079C246303A3A0242BFF5626875F 89245~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on LIC SR79 16.87-33.1~|~05 - 4R Maintenance - Resurfacing~|~BBA5ECD9597F64E1A0137033CA074A250FC4148F 89245~|~1~|~7~|~07/S<2/NEWA~|~"07/S<2/OT/NEWA" - District Preservation Marking Pavements 4MP7(80% State) / 4BG7(20% Local) - No CAP - Striping and Raised Pavement Markings for the Urban Paving on LIC SR79 15.66-16.25~|~05 - 4R Maintenance - Resurfacing~|~C7781D7B73A087115EC26981F3F99C2BF5B62364 115774~|~1~|~1~|~01/S5K/KENT~|~Full depth reconstruction. 95% federal funds from the Small City Program until the cap is reached. The non-federal match and any funds needed after the cap is reached will be provided by the City of Kenton.~|~04 - Reconstruction - No Added Capacity~|~1DCDB82274D7E11DE23AE06A4AB6B39C513301DB 115774~|~1~|~2~|~02/S5K~|~Paving of surfacing course. The 20% federal funds will come from the District Preservation Program budget. The 20% match will be provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~1AA6F4100CAA7C6539C7043BB67EB69A7AA06B7B 115774~|~1~|~3~|~03/ENH~|~TAP funding for sidewalk work. Funding is 95% federal funds through the use of Toll Revenue Credit (TRC). The match to be provided by the City of Kenton. ~|~28 - Facilities for Pedestrians & Bicycles~|~84CEF206780FED7356BC77DE759E337AC4FDF91C 115774~|~1~|~4~|~04/NFA~|~City utilities including waterline work. Paid with 100% city funds.~|~43 - Utilities~|~D79771C29579DC477C5E530B12B1AF3AABE27373 93296~|~1~|~1~|~01/MPO~|~80% federal /20% local split using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~9DC1536385A6BECE0C7F0E357B5F53CD27080811 114214~|~1~|~1~|~01/CMQ~|~Construction of a shared use path along US 42 from Reading Road to E. Kemper Road.~|~28 - Facilities for Pedestrians & Bicycles~|~D405F378DC76CE74B1281AEED5DEFE9769907367 114214~|~1~|~2~|~02/MPO~|~100% locally funded plan split for a change order to add concrete bus pads, requested by the City of Sharonville during construction.~|~28 - Facilities for Pedestrians & Bicycles~|~388BF6F8D3314A631DF13C0CD260A78F51316470 117980~|~1~|~1~|~01/BRF/CCEO~|~Replacement of COS TR 252 0.01 (SFN 1631829)~|~10 - Bridge Replacement~|~C0BA101151058C8F4FB718ECDCBEA21CE216ED90 93179~|~1~|~1~|~01/STR~|~General system paving in the rural func class area:DEL-229: 0-0.12MAR-229: 0-1.05MAR-47: 0.62-2.09MAR-4: 0-7.93~|~05 - 4R Maintenance - Resurfacing~|~598CB4EB62EF9FC37EB8F301F53B288458905175 93179~|~1~|~3~|~03/STR~|~STP Rural bridge deck overlay 100% state MAD-4-1.79 over Patton Run~|~13 - Bridge Rehabilitation~|~8977463CAD29B5D9A7D82D5D2CE43166846179B2 93179~|~1~|~2~|~02/S<2~|~Generaly system paving in the urban func class area:MAR-4: 7.93-10.01~|~05 - 4R Maintenance - Resurfacing~|~C7D97B60555425A1047F1E8C63E707FC6B207ADF 120332~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~9D8C83C786256F9A5B41C91EBEB252949404748A 112964~|~1~|~1~|~01/IMS~|~FRA-270 from 0.00 to 0.63 and 9.62 to 17.10~|~05 - 4R Maintenance - Resurfacing~|~6F6D1046D7688D908A220A70E61729322873517A 93600~|~1~|~1~|~01/IMS~|~Replace structures SFN 1204416 CLA 70 1325 L and SFN 1204238 CLA 70 1101 R~|~~|~C4527F28501E752B8F541D8D67A9E2949BBBA1CC 87799~|~1~|~2~|~02/NHS~|~80/20 fed/state split for culvert work.~|~05 - 4R Maintenance - Resurfacing~|~1DF2A431C613C9E730119035AA93E7CC10B198AA 87799~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all pavement work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~D09359961169467374DD2DF2C076D4D508BB8FC3 107274~|~1~|~1~|~01/NFA~|~Resurfacing of Boston Mills road.~|~05 - 4R Maintenance - Resurfacing~|~A411C4877BE56F5AC90DEAA5B9868848CE4FAA85 114397~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~FE4A60B9A1B01D33CD9C4C52E9C2999AE37717C1 103693~|~1~|~1~|~01/NFA~|~The City of Northwood is proposing several U-Turn improvements on Oregon Road at Wales and Arbor roads along with pavement upgrades to Oregon Road. The project starts at the intersection of Wales and Oregon continuing south to 200 feet south of Caple Blvd. a total distance of about 3200 feet.~|~01 - New Construction~|~588A8BA3D9CA52C05A103EC55FFA69204602B766 108156~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAD-38-12.61-13.47 MAD-42-7.11-9.16~|~05 - 4R Maintenance - Resurfacing~|~52281289E816EA6F99EFC70D08EBC9C05045F0D9 108156~|~1~|~2~|~02/S5K~|~STP 5000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~9B31618965AABACEF5E081DE1189F4B1F7DD2B88 108156~|~1~|~3~|~03/SAF~|~Install crosswalk, RRFB, and lighting at the intersection of SR 38 and High Street NE in the Village of Plumwood~|~21 - Safety~|~98218122317120C84B7A30E59BD79B57367F7B9D 109410~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers~|~21 - Safety~|~760CD90B9CCC9FB063A86A919399C473F6991E83 88943~|~1~|~1~|~01/S>2/Cols~|~Urban paving in the City of Columbus. FRA-33-20.69 to 21.91~|~05 - 4R Maintenance - Resurfacing~|~A5DC02A2C47E83347E7E03C951DCEC8DE2A10A83 88943~|~1~|~2~|~02/NHS~|~Priority system paving of FRA-33: 21.91-24.26~|~05 - 4R Maintenance - Resurfacing~|~3B25D611D4E62B16D3E6360200763CAF80EC2706 124987~|~1~|~1~|~01/ENH~|~MPO TAP Funding~|~28 - Facilities for Pedestrians & Bicycles~|~9CCBED68D6A51AF6EA029134829C4A2D7B25B777 106877~|~1~|~1~|~01/NHS~|~Construct noise wall along SR 315~|~04 - Reconstruction - No Added Capacity~|~43ED7216C4FE015FD679369F3C50DB66899E4A95 106877~|~1~|~2~|~02/NHS~|~Relocation of DMS sign~|~04 - Reconstruction - No Added Capacity~|~F81989CD448527F1E69C9277BBC35FB6665A0014 106877~|~2~|~3~|~03/IMS~|~Repair of noise walls on MAD-70, FRA-71, FRA-270, FRA-670~|~04 - Reconstruction - No Added Capacity~|~E7DD159D7F34BE39A43BFE94A2E8323CB38C0FCB 106877~|~2~|~4~|~04/NHS~|~Noise wall repair on DEL-42~|~04 - Reconstruction - No Added Capacity~|~16ECF7F8696A5A37FBFB0355E78EDD7925E3C633 109804~|~1~|~1~|~01/STR~|~Resurfacing on SR 309 outside of the Kenton Urban Area using district preservation funds (4PF7 - 80% and 4PS7 - 20%). From Kenton Urban Area Boundary at 18.44 to the County Line.~|~05 - 4R Maintenance - Resurfacing~|~2C8D9ECC5401F6402A07BA7A00C7E11E18BE28B3 109804~|~1~|~2~|~02/S<2~|~Resurfacing on SR 309 inside of the Kenton Urban Area but outside of the City of Kenton using district preservation funds (4PF7 - 80% and 4PS7 - 20%). From CR 171 at 16.93 to the Kenton Urban Area Boundary at 18.44.~|~17 - Construction Engineering~|~364BB30808AABEE829E34600C7AC9244503D2C35 116749~|~1~|~2~|~02/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~588C59D19ECAB6EE5817451FC1632319904893C6 116749~|~1~|~1~|~01/STR~|~Resurfacing, includes paving over 3 bridges 10' to 20' span.~|~05 - 4R Maintenance - Resurfacing~|~FA08ACE19CC0A408377CED2ECD3C50C971B751F0 116547~|~1~|~1~|~01/MPO/GRNT~|~Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads.~|~21 - Safety~|~40F135A229061F9E7813F6F495CED7ECFA4FA296 116547~|~1~|~2~|~02/NFP~|~resurfacing of roadway north of Bridgetown to the roundabout limits~|~05 - 4R Maintenance - Resurfacing~|~49B44ED337AB9A5829F6AAC0C13F9BE09766F1C9 105255~|~1~|~1~|~01/STR~|~Resurfacing of BEL-9 from SLM 0.00 to 13.60~|~05 - 4R Maintenance - Resurfacing~|~E8D095E2A46EC27A54D7D3C4BEEC9EF62C9A0B70 105255~|~1~|~2~|~02/S<2~|~Resurfacing SR 9 from SLM 13.60 to SLM 14.60~|~~|~E4262D201FF02A8A67E1956DB552D94B2109C595 86691~|~1~|~1~|~01/STR~|~Preventive Maintenance Smoothseal~|~47 - Bridge Preventive Maintenance~|~74FA218EA20B8FEDD6EE69486C9929F17E32585A 116003~|~1~|~1~|~01/SAF~|~HSIP funding 4HB7~|~21 - Safety~|~6E7819CF54F0E435453E0F66667AAED68A2AA8E9 79991~|~2~|~2~|~02/IMS~|~4805259 LUC SR51 8.46 Intersect: Ir 475~|~13 - Bridge Rehabilitation~|~0506724AE24872E708A473524199029E61C7C734 79991~|~1~|~1~|~01/BRO~|~4808282 LUC IR475 14.18 Intersect: Bowen Road 4808312 LUC IR475 14.34 Intersect: Rushland Ave~|~13 - Bridge Rehabilitation~|~0CFCA7E48365EBF8EB537221AC89C2BEB2FE4ACD 79991~|~1~|~3~|~03/NHS~|~Split for additional work to complete intersections on ends of Rushland and Bowen bridges. Requested work from the City.; 50% will be City funded and 50% will be District alloc. @ 80/20~|~13 - Bridge Rehabilitation~|~2B1B246DA7D1AE2B7DCA6F75616822ABE00FCC6D 102017~|~1~|~1~|~01/IMS~|~Mine remediation underneath IR 680 at SLM 14.50 Ramp J and SLM 15.60 mainline.~|~17 - Construction Engineering~|~B363FC831349AB389B0ABB9BAF01828627B6EC89 84105~|~1~|~1~|~01/NFA~|~"01/NFA/OT/FAIR" Fairfield County Metro park project.~|~~|~883CBE1ABDEA59F3BE20FBB4CC0D9C79B1630EF4 107503~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7~|~05 - 4R Maintenance - Resurfacing~|~FE23204FB8A2C97A3A06D928FE2F636CBA647EA6 107503~|~1~|~2~|~02/NHS~|~Repairs to guardrail within the City of Steubenville~|~05 - 4R Maintenance - Resurfacing~|~BF373AFEC0D46B9DBCB1263264477347D2988AE5 119998~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~7EDAA045763EA2FACB684F0E5C0BD9F7B49169FB 90901~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds~|~05 - 4R Maintenance - Resurfacing~|~D33C1FF6A28F020611C31EECEA8DD46CB0B3FC1C 121911~|~1~|~1~|~01/ERD/CANT~|~Streetscape project.~|~28 - Facilities for Pedestrians & Bicycles~|~0DD7D1435AC9EF308D57596D5E4B6C75D9248150 123782~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~5EA0EB1218AAFBFFD62970F93835226ED590845A 126699~|~1~|~1~|~01/STR~|~stp rural bridge plan split.~|~10 - Bridge Replacement~|~E74FA58717935A570ADF055D0C861EAB18F7B153 107937~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 11.65-11.69. DSR MOE-009. Rural other federal aid funded 80% federal/20 % state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6D694268323C7F03C51D14C9DCC8C35ED08B120 112062~|~1~|~1~|~01/NFP~|~Funds for SR 101 reconstruction and sewer on US 20.~|~04 - Reconstruction - No Added Capacity~|~972A00CB1E7182BD65D01D860484B34F0A206EA1 110613~|~1~|~1~|~01/NHS~|~Split for paving on the NHS~|~05 - 4R Maintenance - Resurfacing~|~43C5EDFCCD0E0067CF26171803E571F76051DEA0 112748~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C5719773599E010C50568F3D3BF8B67A1868A915 112748~|~1~|~5~|~05/S>2/LOUI~|~Full and partial depth repairs in the City of Louisville.~|~05 - 4R Maintenance - Resurfacing~|~7B7AB854220F6B12E59226059B809C48F2836144 112748~|~1~|~4~|~04/S>2/CANT~|~Full and partial depth repairs in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~8698082A554182788C013A344A31938B76666B30 112748~|~1~|~2~|~02/S>2/CANT~|~Resurfacing, urban paving in the City of Canton. Priority 1 funding event 20% local portion, Priority 2 funding event 80% D04.~|~05 - 4R Maintenance - Resurfacing~|~33B1DA40FC7DBD829E75CFFBD7A529841621DA40 112748~|~1~|~3~|~03/S>2/LOUI~|~Resurfacing, urban paving in the City of Louisville. Priority 1 funding event 20% local portion, Priority 2 funding event 80% D04.~|~05 - 4R Maintenance - Resurfacing~|~6CF499FC3341F2326E155DD22883BECD10DD2369 112748~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~F8325013E4DA93DA283658A64E129FA5EE84B5C1 119187~|~1~|~1~|~01/IMS~|~Drainage block PID.~|~99 - State Preventative Maintenance~|~E7BC14D9930C847DDDFFC15520501261CD955DDB 100836~|~1~|~1~|~01/S>2~|~Culvert repair on urban route.~|~13 - Bridge Rehabilitation~|~222A18EFC826AB976DD5F0CBFFCC2580A207E742 100836~|~1~|~2~|~02/NFA~|~Culvert repair on non-Federal Aid Route.~|~13 - Bridge Rehabilitation~|~B4D4A142860F9E05C748D4EA71ED0F8F1705E7E8 100836~|~1~|~3~|~03/STR~|~Culvert repair on rural routes.~|~13 - Bridge Rehabilitation~|~760038D7B72F3F1A0CB3DB957485FDE21C4A9BE4 100836~|~1~|~4~|~04/IMS~|~Culvert repair on Interstate route.~|~13 - Bridge Rehabilitation~|~BCA684EA7FC0425D7B376CBBB472CB7D31B18569 124983~|~1~|~1~|~01/BRO~|~Deck overlay, substructure and superstructure repairs, painting and new parapets~|~13 - Bridge Rehabilitation~|~9577189F57E564F1D4F590417E25C4537AA1DE1A 122427~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~B450FA10C8C16D37F2AE6E07F6958C5314860722 94579~|~1~|~1~|~01/NFP~|~Tuckpointing/Misc Brick Work at District Office complex~|~44 - Other~|~71A12DEBB21E4D2D61E50ABFE7B602050BD8050B 126888~|~1~|~1~|~01/NHS~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~E6092947188AE2D19EFAADA1DB2166BEF6BE17AD 126888~|~1~|~2~|~02/NHS~|~Cost of repairs, curbs, ramps walks on sections of SR-18 and US-23 to be resurfaced. Doesn't include resurfacing cost, just repairs, curbs, ramps, walks, etc.~|~05 - 4R Maintenance - Resurfacing~|~5C5CA69900FB74065C78F3DABD350B40FD57AF1D 126888~|~1~|~3~|~03/NHS~|~Reconstruction on US 23~|~04 - Reconstruction - No Added Capacity~|~12401881D9B2763ADC53A6F58710CC9360C2445C 91866~|~2~|~1~|~01/IMS~|~Replace the existing superstructure on the twin bridges at SLM 5.92 (BEL-70-0592 L & R, SFN 0702072, 0702110) with a new continuous prestressed concrete I-beam superstructure on existing substructure, and widen bridges by building new bridge sections to accomodate two lanes of traffic in each direction for MOT. Minor substructure repairs required.~|~10 - Bridge Replacement~|~B2793D649E43DA9D9AA114C58CB9FCDA538777AD 95075~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $256,000 - Rock Scaling at LIC-IR70-19.86EB/19.88WB~|~44 - Other~|~7C34CC37067FDED0F14391C49D5763BCCBC5EA71 95075~|~3~|~3~|~03/S>2~|~"03/S>2/OT/" - Geological Site Management 4SF7 (80% fed) / 4SS7 (20% state) Rock scaling at CUY-17-15.30~|~44 - Other~|~998EAC6B84C020118E349F7C3D766C91AC43B8BA 95075~|~2~|~2~|~02/IMS~|~"02/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $265,000 - Rockfall Barrier Installation at LIC-IR70-21.44~|~44 - Other~|~AC921FFCD5E8FE29BD015BDE6D3413013922AB10 106331~|~1~|~2~|~02/NHS~|~Bridge Work:HUR-US-20 08.130 SFN 3900754 (OVER WEST BR HURON RIVER)Preventive Maintenance: ? Expansion joint repair/replacement (048) ? Deck Sealing (051) Reactive Maintenance: ? Conc patch(non-deck) (010) ? Deck patching(conc) (049) ? Exp jt repair/repl (048) ~|~13 - Bridge Rehabilitation~|~109C35E52CB8AF604DB361C42B650A1E850B0944 106331~|~1~|~1~|~01/NHS~|~Resurfacing HUR-20-7.35 to 10.76~|~05 - 4R Maintenance - Resurfacing~|~1204BCFB83FBE03E18EC25BD3297D03043FA9EAA 106331~|~1~|~4~|~04/SAF~|~Safety agreed to fund the southern RRFB (up to $20k) at the park entrance due to the 45 MPH speed limit and the westbound vehicles coming off of a 60 MPH divided 4-lane section just a half mile prior. She will not be funding the northern RRFB. See attached email. ~|~21 - Safety~|~E5F4B68E157111F050047E2BCAB9F8C2E4DE1543 106331~|~1~|~3~|~03/SAF~|~Long line r-wr pavement markings~|~05 - 4R Maintenance - Resurfacing~|~CCA934672F89B236276D063F8CCC2E3BE996FEFE 94460~|~1~|~1~|~01/SAF~|~Safety funding for Hilliard Rome improvements~|~21 - Safety~|~3F657FD9D8BD62254F64F4512B0308C5FD51700A 110876~|~1~|~1~|~01/SAF~|~Extend US 30 WB right turn lane, add SR 57 right turn, and replace signal to include backplates.~|~21 - Safety~|~2F279835E92420A48161A037C0AC102A82553DC4 90382~|~1~|~1~|~01/BRO~|~Fifth Ave bridge replacement over Scioto River using municipal bridge funds (4R87). Columbus is sponsor.SFN 2560771, 5th ave over Scioto River~|~10 - Bridge Replacement~|~25DB291E5E20F84D547F47E2CE21A78218778E98 90382~|~1~|~2~|~02/ENH~|~MORPC Enhancement funding (4TC7) to widen Fifth Ave deck and construct multi-use path from McKinley Ave to Dublin Rd. Columbus is sponsor.~|~28 - Facilities for Pedestrians & Bicycles~|~463131283499609033F5ABF7538B595C3E186044 109879~|~1~|~1~|~01/STR~|~2022 chip~|~05 - 4R Maintenance - Resurfacing~|~BC15239742AED9F090AB815FEE4F1909B1804FC5 106849~|~1~|~1~|~01/IMS~|~Construction of Noise Wall on the North side of IR76 just East of State Route 534 in Mahoning County, Ohio.~|~20 - Environmental Only~|~387EE15BB34582C66E6F1935DCF86DB9070AF6AF 96956~|~1~|~1~|~01/BRF~|~Split for the replacement of the North Main Street bridge (SFN 1832581) over the Chagrin River.~|~13 - Bridge Rehabilitation~|~90F0F7005F4FABD77070CF0CE83921130F036369 96956~|~1~|~2~|~02/NFA~|~The work is for non-eligible items at 100% local cost.~|~13 - Bridge Rehabilitation~|~5D3215ACF30BC4D909875206358FAD8236EA908C 106931~|~1~|~2~|~02/IMS~|~Plan split for noise wall on I-475~|~20 - Environmental Only~|~8F81D0D1FA6A1AF563ACADA92AAC02CC375C2459 106931~|~1~|~1~|~01/NHS~|~Plan Split for noise wall on US 23~|~20 - Environmental Only~|~F07FE2357C1223D5653FF536E1731CE2967A0341 98292~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP ? deck replacement and other repairs on 1) 6002439 MUS-70-2.99 Intersect: CR 28; Not BR Eligible for Rehabilitation: Length=120 SD/FO(0) SR=89.3 DSR=7; 2) 6002439 MUS-70-2.99 Intersect: CR 28; Not BR Eligible for Rehabilitation: Length=139 SD/FO(0) SR=89.3 DSR=7~|~13 - Bridge Rehabilitation~|~F3E7CFD5FBA7C866692730AB9869100B5E219ADC 100017~|~1~|~1~|~01/MPO~|~Sidewalk on West side of Didion~|~21 - Safety~|~66CB2A4EC9ED0012E9602B9705BF6C2958E65AB5 114356~|~1~|~1~|~01/IMS~|~plan split for landslide corrections along HAM IR 275~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~21453DEC756A0FFBEE5E578C7B428214F1EE4152 97545~|~1~|~3~|~03/BRF~|~Ohio Bridge Partnership Program. SFN 5237211, Grafton Road~|~17 - Construction Engineering~|~158A44D7712D0F2A1E9E39B3010DEA3CA031E012 97545~|~1~|~2~|~02/BRF~|~Ohio Bridge Partnership Program. SFN 5233836, Weymouth Road~|~~|~A9EF4CB87470BC0991AACB54BF39E8BE75B788B8 97545~|~1~|~1~|~01/BRO~|~Ohio Bridge Partnership Program. SFN 5239125, Muntz Road~|~10 - Bridge Replacement~|~DA91393922354110510396F29F5D6DB529EFF37F 96459~|~1~|~1~|~01/STR~|~SFN 1900722 DAR-47-1889 place new wearing surface of non-composite box beams with latex modified concrete hard overlay.~|~13 - Bridge Rehabilitation~|~6FBEEBEF3839519F40F94BE7B7D540934364E9BA 96459~|~1~|~2~|~02/NHS~|~SFN 1901095, DAR-49-1181 place new wearing surface of non-composite box beams with latex modified concrete hard overlay.~|~13 - Bridge Rehabilitation~|~A3E2387AC993AA4C34E8055CEAC8BD3A581B874C 96459~|~1~|~3~|~03/NFA~|~SFN1904426, DAR-722-0996 place new wearing surface of non-composite box beams with latex modified concrete hard overlay.~|~13 - Bridge Rehabilitation~|~D89B1F4210DF0F7657A2921591CCD61A8050A441 81632~|~1~|~2~|~02/IMS~|~Minor bridge work to the linked structures.~|~13 - Bridge Rehabilitation~|~0F3F1F0560318042E792DF1157A382D6444B2FA6 81632~|~1~|~1~|~01/IMS~|~Resurfacing SUM IR 77 from 28.37 to 33.62, Resurfacing of SR 21 and SR 176 ramps to and from IR 77.~|~05 - 4R Maintenance - Resurfacing~|~203A620E6CE844EF1037A3F96B9EF82F82E4681B 123632~|~1~|~1~|~01/NHS~|~Plan Split for NHS~|~05 - 4R Maintenance - Resurfacing~|~73F49DE3F9EBF58534FDFCF310DD52A653552E67 117222~|~1~|~1~|~01/NHS~|~Landslide repair project. MOE 7 7.51. GSM Funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EF325B0ADB479B1B2B65F0B2F7F03E4AC180394D 93913~|~1~|~2~|~02/SAF/GAH~|~100% Gahanna items for non-reimbursable roadway items - brick pavers and conduit~|~21 - Safety~|~4AA6EB4D48CF545FC787F857C71C7D7F19D2FFB7 93913~|~1~|~1~|~01/SAF~|~100% Safe Route to School funding up to project cap for Jefferson Path, Laura heil Extension, Cherrybottom and East Johnstown improvements01/SAF/OT/~|~21 - Safety~|~FED50CD3677423AAC973E5DFC0C8F3A617976F82 99231~|~1~|~1~|~01/STR~|~CR10, CR35 and CR61.~|~05 - 4R Maintenance - Resurfacing~|~5DC90CF1EA2E39E3F377CA9480CB9046027C9F6F 94598~|~1~|~1~|~01/STR~|~Rockfall hazard mediation. MOE 800 5.97-6.45. GSM Funds. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54610F0486A15F689C58133F923BE9E42F288D46 100978~|~1~|~1~|~01/S<2~|~District Preservation Pavement 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Paving on OFAH-Urban portions of US 36: 1) Kno-US 36-20.82 to 20.85;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B99E3E63792A40DB73D0995895B6FA2156AA13E2 100978~|~1~|~2~|~02/STR~|~District Preservation Pavement 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Paving on OFAH-Rural portions of US 36: 1) Kno-US 36-20.85 to 29.50; 2) Kno-US 36C-00.00 to 00.12;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DF6B278BC38157A63DE919962885299CBC3F4D61 116497~|~1~|~1~|~01/STR~|~Repair or Replace Culvert~|~~|~09EADFC12C174FEB87966FF5962DB525FE1A3066 125482~|~1~|~1~|~01/S5K~|~Culvert repair.~|~17 - Construction Engineering~|~4050ABC3597B5A16F002CC511CF1C3C2E1FEF298 115332~|~1~|~1~|~01/SAF~|~Construction of sidewalk and curbs in the Village of Racine. ~|~28 - Facilities for Pedestrians & Bicycles~|~5E3DF786F16F95306BE1FC4CDE16832694D42ED3 115332~|~1~|~2~|~02/SAF~|~Reimbursement for signs that the local took into their possession. 100% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~F021FB7381281C238EA4771216C520428CED86D0 85871~|~1~|~1~|~01/BRF/LANC~|~"01/BRF/BR/LANC" City of Lancaster bridge replacement on Columbus Road utilizing Municipal Bridge Funds Capped at $229,000~|~10 - Bridge Replacement~|~92520C07137E59D11A12C8031B99A757496A773B 113467~|~1~|~1~|~01/S>2~|~Roadway milling and resurfacing and new striping in the City of Tipp City.~|~05 - 4R Maintenance - Resurfacing~|~0B52FC1C5F809A72DCDFB868DAD312A98E32F918 113157~|~1~|~1~|~01/NFP~|~The city of Lima will make street traffic calming and pedestrian safety improvements to the Health Education Corridor (Bellefontaine and Market Streets from I-75 west to North Jameson Ave.~|~44 - Other~|~449AF5A3BC23A3BE0B70AD0AE39DDE76329AD5E8 114484~|~1~|~1~|~01/STR~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~2BC465FAF066105E14A52145B38CDDE6E5B32622 125758~|~1~|~1~|~01/IMS~|~Bridge rehabilitation, new deck, beam repair, convert abutments to semi-integral and painting beams ~|~13 - Bridge Rehabilitation~|~DAF3E618190EE5CE34DC8B756B3E2343918D8015 92356~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment. install retaining wall to mitigate landslide.~|~04 - Reconstruction - No Added Capacity~|~E5A00CF2FA307B2A7E6BC867BA6C5604D027EF3C 110703~|~1~|~1~|~01/NHS~|~DEL-23 Priority Section Pavement Repairs~|~05 - 4R Maintenance - Resurfacing~|~2F841ACC739E4D8B69E139353797669BD771E7FA 114472~|~1~|~1~|~01/STR~|~Resurfacing US 62~|~05 - 4R Maintenance - Resurfacing~|~6E6FD96672AFC6D5A1ACB6E604C9B66886065A99 108886~|~1~|~1~|~01/NFP~|~TID will construct the Cleveland Massillon Road project~|~44 - Other~|~6A2C1DAAE5ABB0AD05061D56AED0BC9779A4F19C 109842~|~1~|~2~|~02/STR~|~LAW 243 (11.59-15.23 / 16.17-17.48)LAW 378 (0.00-9.46)~|~05 - 4R Maintenance - Resurfacing~|~9502329BB9E5E9FED8F7BADD4914363EDFCADC4B 109842~|~1~|~1~|~01/S<2~|~LAW 243 (15.23-16.17 / 17.48-18.39)~|~05 - 4R Maintenance - Resurfacing~|~A32F928A3BA5B5C80FE61297165582DF64151B6E 109842~|~1~|~3~|~03/STR~|~Bridge PM on LAW 378 4.84~|~47 - Bridge Preventive Maintenance~|~56379E7661EA6E49899A65C5FA537C82BD6C2A37 109842~|~2~|~4~|~04/STR~|~LAW 378 2.25 Culvert~|~04 - Reconstruction - No Added Capacity~|~A07F984234C5B436756011D8B3100B2249876AE6 114202~|~1~|~1~|~01/NFA~|~Established Plan split for construction engineering task order.~|~17 - Construction Engineering~|~21CDE0004096C2D4860FF6EC49D95ECB836FF32D 100539~|~1~|~1~|~01/NFA~|~Chip sealing COL-164 from SLM 18.00 (TR 859) to SLM 23.10.~|~05 - 4R Maintenance - Resurfacing~|~13E1DF58CF9CDB769088B38288EC4D616DF3C67A 100539~|~1~|~2~|~02/S<2~|~Chip sealing COL-164 from SLM 23.10 to 24.31.~|~05 - 4R Maintenance - Resurfacing~|~648AAF2DDFC8F84C440C35CC7FB892640809948B 101087~|~1~|~1~|~01/NHS~|~Overlay US 33 in Logan County: LOG US SLM 1.97 to 6.57~|~05 - 4R Maintenance - Resurfacing~|~3F6BA99FF4FF6C58A15534B1BBED6BAB0340FD03 124541~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items~|~28 - Facilities for Pedestrians & Bicycles~|~DE98F86238D6224868A2899D2DD7BC45DB7E0498 103820~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate bridges.~|~~|~2DACC169F5DCE0AD893458FAD107E4A907FE03FB 97961~|~1~|~1~|~01/STR~|~SR 707 SLM 0.00 to SLM 11.29 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in)~|~05 - 4R Maintenance - Resurfacing~|~714ED0CED96FEC615804D2752C539138CF4862EB 117560~|~1~|~1~|~01/MPO~|~Plan split for intersection pedestrian crossing improvements eligible funded work.~|~28 - Facilities for Pedestrians & Bicycles~|~C99BD169A460929A3A96C4BAF72A791719BBED31 93534~|~1~|~1~|~01/SAE~|~The project includes retrofitting the Galbraith at Plainfield Road traffic signal and replacement of the Plainfield Road at Matson traffic signal. The proposed signal work to include pedestrian signal heads with countdown heads.~|~21 - Safety~|~A1468C9B5E97D62DC1CEF99E00BFD58C7AC279B0 105335~|~1~|~1~|~01/STR~|~Microsurfacing on rural route: MER US 127 SLM 19.42 to 23.08~|~05 - 4R Maintenance - Resurfacing~|~29616060C2F736E8665A2DB7770FB845BE275B72 120106~|~1~|~1~|~01/NFP~|~Resurfacing entire facility~|~05 - 4R Maintenance - Resurfacing~|~DFCB38F19B44AE8EA4E63A4ACC14700F39B1E45F 84567~|~2~|~2~|~02/BRO~|~02/BRO/BR/ : District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No Cap - PART 2 of 2 - Replace deck on HAR-68-9.40 structure over the Scioto River (SFN 3300773). Functional Class is Principal Arterial.~|~13 - Bridge Rehabilitation~|~03990FD13706362D4F8AB79A61F83F4B8737D95E 84567~|~2~|~3~|~03/BRO~|~03/BRO/BR/ : District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No Cap - PART 2 of 2 - Replace 2 center box beams on HAR-67-13.13 bridge over Silver Creek (SFN 3300587). Functional Class is Major Collector.~|~13 - Bridge Rehabilitation~|~88B9067353D63DFB83A5E5EE6F9DED5FF58A4F02 84567~|~1~|~1~|~01/S<2~|~01/S<2/BR/ : District Preservation 4PF7(80% Federal) / 4PS7 (20% State) - No Cap - PART 1 of 2 - Deck overlay, etc. on HAR-31-11.23 over the Scioto River (SFN 3300366). Functional Class is Principal Arterial.~|~13 - Bridge Rehabilitation~|~C10C6D300C84A2AC03EDF14C9CCC0E0B88CB12C4 110067~|~1~|~1~|~01/NFP~|~Plans split for Lighting maintenance~|~21 - Safety~|~3DBFC47135FA599517BE4FE0C00142794E037FD2 102751~|~1~|~1~|~01/NHS~|~Resurfacing of NHS route~|~05 - 4R Maintenance - Resurfacing~|~16FF8B4208ABEEDD87554A1DD54F9AAAF1F55799 102751~|~1~|~2~|~02/STR~|~Resurfacing STP Rural route.~|~05 - 4R Maintenance - Resurfacing~|~6019C5A0F805FB9F1EA45314539A624E38F36736 119494~|~1~|~1~|~01/NFP~|~Plan Split for repairing guardrail in all counties in District Six, besides Franklin County.~|~21 - Safety~|~97E2493431271A04A2B50A44B1539688AD5843ED 117135~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~17 - Construction Engineering~|~E25F9CB044944399F726D88321AA991F3C42D67F 88566~|~1~|~1~|~01/IMS~|~resurface WOO IR75 0.00-5.03 - Hancock County line to to SR-25 (Cygnet)~|~05 - 4R Maintenance - Resurfacing~|~D7B9BCEFDF31E1CB294D5F711BCAF5A9DAEDE872 110699~|~1~|~1~|~01/STR~|~All items of work on FRA-665.~|~05 - 4R Maintenance - Resurfacing~|~DDBBB09A06C742A464C0BF6EA45EA9B236D70952 94463~|~1~|~1~|~01/STR~|~Microsurfacing - LOR-82-5.13 to 10.06 / RIC-61-8.63 to 12.39~|~99 - State Preventative Maintenance~|~6A3FC695ADA11F9DB3D60C4369E5868EA66195CE 94463~|~1~|~2~|~02/NHS~|~Microsurfacing - MED-18-16.52 to 21.13 (rumble strip work only from 16.00 to 16.52.~|~05 - 4R Maintenance - Resurfacing~|~97139D450BE4AA8F0414048864894E25889053F8 94463~|~1~|~3~|~03/S<2~|~Microsurfacing - RIC-61-7.68 to 8.63 / 12.39 to 13.17~|~05 - 4R Maintenance - Resurfacing~|~11446F2BF82A7FF44ED3E4BAA88C4B5CFBC54A80 110088~|~1~|~1~|~01/IMS~|~Culver repair/replace on IR routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1842B35F5003208649613DFE4B83185582BB3F7B 110088~|~1~|~2~|~02/NFA~|~CFN1808775 linked to Not on Federal Aid System~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~805FA7A1E3154296ED38DFA98239F826551BE384 119606~|~1~|~2~|~02/NFA~|~All items of work associated with the resurfacing of SR 187~|~05 - 4R Maintenance - Resurfacing~|~21B2DE6EE76D8A40AE68F14C3D265F716C1C3BEE 119606~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing and reconstruction of SR 41 and the resurfacing of SR 323.~|~05 - 4R Maintenance - Resurfacing~|~EB8A4503043FA4302FFA69C861DBC29B40130611 124728~|~1~|~1~|~01/ENH~|~Shared use path utilizing 100% Federal funds (TAP and Safety) up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~840C43E0046993C04939610579ED25F017F3328F 116420~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district.~|~21 - Safety~|~0B07BDEBAE608A56A32453FBA18CC6D6494E00E8 105451~|~1~|~1~|~01/STR~|~Plan Split 1 for resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4D55AF6008333F7B6376DD8A841BD9E314AB7D62 105451~|~1~|~2~|~02/S<2~|~Pavement Work~|~05 - 4R Maintenance - Resurfacing~|~FE86E3D6349E3D804153CAE1FF061EEEF3D947D2 105451~|~1~|~3~|~03/STR~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~71B788146151E74C63A9866350A2AAEEB79B84FC 100042~|~1~|~1~|~01/STR~|~Type A emergency slide repair. MOE 556 9.48. Rural other federal aid funded 100% Federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EDBAC6F3F65BEE1A1992345029ACBD336A9E2595 100042~|~1~|~2~|~02/STR~|~Type A emergency slide repair. MOE 556 9.48. Rural other federal aid funded 80% and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~230FA6EC05BC902F878F92B39579513F7442CBE1 91383~|~1~|~1~|~01/NHS~|~Remove existing overlay on bridge (COL-30-3543, SFN 1502360) and provide new MSC overlay. Spot painting of structural steel and repair of existing bridge parapets.~|~13 - Bridge Rehabilitation~|~5DFF9FE413CAF6F801C0C2E7664A1B6F6E244252 91383~|~1~|~2~|~02/NHS~|~The project includes the removal of the existing asphalt overlay on bridge COL-303543 (SFN 1502360) and replacing it with MSC overlay. The funding event is for on-going services to be provided by consultant during construction.~|~~|~A083DEEDED783539BB8B74F706B2D9C41284FA43 88953~|~1~|~1~|~01/BRO~|~IR76 11.48R SFN 7705972 intersected I76WB ramp to I77SB~|~~|~32A486E7EF9C4C7236D2734FA2C38C37B2933067 88953~|~1~|~2~|~02/S>2~|~IR76 11.48R SFN 7706065 intersected I76EB off ramp over I76WB~|~~|~98A559E463CA8B34164F396BFA9F630B41FD2B0D 105367~|~1~|~2~|~02/S<2~|~AC overlay without repairs on:MIA US 36 SLM 7.21 to 8.25~|~05 - 4R Maintenance - Resurfacing~|~214AD2366AB07BB27044CBCC18B795CE71EF11E4 105367~|~1~|~1~|~01/STR~|~AC overlay without repairs on:MIA US 36 SLM 4.61 to 7.21MIA SR 48 SLM 16.88 to 19.40~|~05 - 4R Maintenance - Resurfacing~|~EEE1DD8376F71BA6B602BBB51049B3342056B9F6 115281~|~1~|~1~|~01/BRF~|~01/BRF/BR/ - 100% State (4PS7) - superstructure replacement on COS SR 751 4.21 (SFN 1602977) carrying SR 751 over Evans Creek~|~13 - Bridge Rehabilitation~|~DA502ECE147566615ADEBF8DA0E6102D50BDF7CA 89731~|~1~|~1~|~01/NFA~|~Rehabilitate bridge BUT-1SP-0746 (Hueston Woods State Park Loop Road Drive over Four Mile Creek) and entails upgrading the rail, installing a new overlay, repairing the undermined approach slab, and repairing the undermined abutments. Also, rehabilitate the bridge size culvert GRE-001SP-0109 (John Bryan Park Rd. over a tributary to the Little Miami River) by reconstructing the stone headwalls as cast-in-place headwalls.~|~13 - Bridge Rehabilitation~|~8BD900AD25DCB7F0EDED2F8F8B21EB49475727D6 102904~|~1~|~1~|~01/MPO~|~Resurfacing of West Steel Coreners Road from Northampton Rd to State Rd in the City of Cuyahoga Falls.~|~05 - 4R Maintenance - Resurfacing~|~B83A96552A0168BE172AB36BB5E42D8C36D8C6B4 108148~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: UNI-31-0.00-1.51~|~05 - 4R Maintenance - Resurfacing~|~340B9303E838BAE7DFBBE602371AE8F09CD85151 105802~|~1~|~1~|~01/IMS~|~Plan split for bridge painting work~|~47 - Bridge Preventive Maintenance~|~D8B3C898BA724F506163616D540E9FDD855BABD3 105313~|~1~|~1~|~01/BRF~|~BRO CR 76 5.55 (SFN 0835137) bridge replacement.~|~10 - Bridge Replacement~|~BA578559AF74D3D10159671F873E2270F77D4D3A 115153~|~1~|~1~|~01/SAF~|~Plan split for RR crossing improvement~|~21 - Safety~|~9CA9E2F888AA0C2E83E63122A34122F9E6207470 98283~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for Gue-70-2042L/R~|~13 - Bridge Rehabilitation~|~0B0E6C6CFA9BEE9F7138500F8BDACCA21BC71FE3 94981~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~44 - Other~|~26F398AA148E45D4F23DD47CBFF3A49433BBD645 119369~|~1~|~1~|~01/SAF/CCEO~|~Reconstruct approximately 7340' of Farmers Road improving vertical curves as well as widening the pavement and berms and removing fixed objects from the clear zone. Work includes associated striping and resurfacing.~|~21 - Safety~|~F42EE34AC3475E36BF41C88E5CB28766B710DD1B 90919~|~1~|~1~|~01/STR~|~District Allocation~|~13 - Bridge Rehabilitation~|~1358B69C54086EED1464A2FEB5DE4857F139132C 107915~|~1~|~1~|~01/NHS~|~NHS portions of DEL-36 Locations and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~D96CED49623DACD14F7EC71ACBAB31A7A8052A59 107915~|~1~|~2~|~02/S>2~|~Urban Portions of Work Locations and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~36A1E4A843AEE4CE54ABB4A887F022B6BEC14DFB 107915~|~1~|~3~|~03/IMS~|~FRA-670 location and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~EF327A3471739D94FCB3FBC2B15CFC99F256670D 116569~|~1~|~1~|~01/NHS~|~Plan Split for bridge work~|~13 - Bridge Rehabilitation~|~F0672873B8BBBFC17FADBAAD3055622990E6E30B 127113~|~1~|~1~|~01/NFP~|~Resurfacing throughout park.~|~05 - 4R Maintenance - Resurfacing~|~667218D0D1531AD8D3D81CD96CEAE25FFFBC58D3 92740~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. GAL 141 17.00-17.06. 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~60A39BF280F5AB9F422C241B3249676A11841F4C 77917~|~1~|~2~|~02/STR~|~all work associated with bridge replacement.~|~17 - Construction Engineering~|~74B627C9663C910C936BE45B01879EB9294CB65C 77917~|~1~|~1~|~01/STR~|~all work associated with bridge replacement and should be funded 100% stp rural~|~10 - Bridge Replacement~|~D09D02CD8CF147F76B69B9D8CE510FFEBA5D6151 121623~|~1~|~1~|~01/ENH~|~Plan Split for MPO TA funding~|~28 - Facilities for Pedestrians & Bicycles~|~1EE3A1FF2B2CD6E20262D1A6B31AB8E280F80827 114945~|~1~|~1~|~01/S>2/MASS~|~Resurfacing, urban paving in the city of Massillon.~|~~|~D759F72EE80AF52401F45FBFDA7438FDC19D38EF 114945~|~1~|~2~|~02/S>2~|~Resurfacing.~|~~|~F74BDA88BEA0D64DA12F8CD675E1898033D99A52 114945~|~1~|~3~|~03/NHS~|~Resurfacing.~|~~|~A55F4C23C336B1AE636B1596107EAA7EFD6F2506 114945~|~1~|~4~|~04/NHS~|~Bridge preventative maintenance >20' span.~|~~|~BDAB57CE72839BDFDC00FECC2C49715409E16FBB 114945~|~1~|~5~|~05/S>2~|~Bridge preventative maintenance 10' to 20' span.~|~~|~8423FD1628ED225F48D1616C81CB88CB272CE064 106094~|~1~|~1~|~01/STR~|~SCI 772 1.86 SCI-003~|~21 - Safety~|~0DA8F06B9CE3085BE97A430EBE2DB2D2A39E70D2 116068~|~1~|~1~|~01/SAE~|~Roundabout - 100% Fed Safety~|~21 - Safety~|~C1565A66DC343FC4EF5C8E24AD716D96262FBA16 126790~|~1~|~1~|~01/STR~|~STP rural plan split.~|~04 - Reconstruction - No Added Capacity~|~904FA4480F355C93D1AAA69C094AD6F26ECD34C4 93417~|~1~|~3~|~03/IMS~|~WOO-18-14.14 bridge (SR-18 over I-75)~|~13 - Bridge Rehabilitation~|~51ADCF2E7FAF55D9A1C159749C9E94E3E5CF7DB0 93417~|~1~|~1~|~01/NHS/NBal~|~resurface Woo SR 18 11.58-14.1; resurface from Rocky Ford Bridge to I-75~|~05 - 4R Maintenance - Resurfacing~|~E6EA607E8C224817FF3A66E1236611746DD60B37 93417~|~1~|~2~|~02/STR~|~resurface Woo SR 18 14.1 to 18.78; resurface from I-75 to Bloomdale west corp line.~|~05 - 4R Maintenance - Resurfacing~|~E732C6BA440389D6D0FDB1D5AA5B0CD435469587 98550~|~1~|~1~|~01/BRO~|~80% federal w/20% local matching funds for municipal bridge eligible work items.~|~13 - Bridge Rehabilitation~|~23E0045E8B9675D7893C6DF6A5C95DAC1A927D69 123672~|~1~|~1~|~01/NHS~|~culvert split.~|~04 - Reconstruction - No Added Capacity~|~7ED874E5C6DA8944746EE404958C2B9E77049B46 90868~|~1~|~1~|~01/S>2/PATA~|~"01/S>2/OT/PATA" - SRTS Sidewalk Project 4SC7 (100% Federal) - CAP $186,090.00 available for Construction Phase - SRTS project on Summit Road in the City of Pataskala Lic-CR 2-00.02 to 00.50 from Broad Street to Cleveland Road.~|~28 - Facilities for Pedestrians & Bicycles~|~25BFAEF4E12DAC12BA404F9837D033D5AB1CAF20 101035~|~1~|~1~|~01/STR~|~CO Inspection~|~17 - Construction Engineering~|~97EB4462CF5576552A5DA4B0F76D6D627E108157 10900~|~1~|~1~|~01/S>2~|~50/50 fed/local funding split for all pavement work on this project.~|~03 - Reconstruction - Added Capacity~|~49C9EE0F77B8A20E4A32C8A4B10ED66C1A65DEBD 10900~|~1~|~2~|~02/S>2~|~80/20 fed/local funding split for all bridge work using county STP funds.~|~10 - Bridge Replacement~|~507F823C572DBB6D90E67964D43C4BBC062418AB 102928~|~1~|~1~|~01/NHS~|~NHS funds eligible.~|~13 - Bridge Rehabilitation~|~E4E7952338BE6F593C94524210B58886E1C46D53 121199~|~1~|~1~|~01/NHS~|~Urban paving~|~05 - 4R Maintenance - Resurfacing~|~AB8A5ECF55793BA7F177E874CDB5725BA691B6E9 126255~|~1~|~1~|~01/S>2~|~Roadway improvement~|~21 - Safety~|~62066C8F6A43E7EAA4E19C8789686A2326FAAD1C 103815~|~1~|~1~|~01/BRF~|~Replacement of SFN 4931416~|~10 - Bridge Replacement~|~4AC29EA6DC7C923535C0323443FD60CB9D53C552 107041~|~1~|~1~|~01/S<2~|~Plans plsit~|~04 - Reconstruction - No Added Capacity~|~CA9E6CB81CA4C067EA47BC44DDDE664F73480C90 93676~|~1~|~1~|~01/STR~|~A slab culvert on HEN-65 @ SLM 10.04, No SFN assigned.~|~04 - Reconstruction - No Added Capacity~|~1E7736C6779F0D2919CAF4EF093D73DFAA706743 125886~|~1~|~1~|~01/ENH~|~Plan split for installation of pedestrian facilities utilizing Transportation Alternative funding~|~28 - Facilities for Pedestrians & Bicycles~|~2BC79442D1B6D80B7015DF534F13CA090ADAA9FA 109695~|~1~|~1~|~01/NHS~|~Resurfacing TUS-36~|~05 - 4R Maintenance - Resurfacing~|~2E9A93AAC85921992AD647C075EDE312F2C6C90E 105214~|~1~|~1~|~01/IMS~|~Plan split for resurfacing on HAM-71~|~05 - 4R Maintenance - Resurfacing~|~B9B16B932EF39F32D35F0E2567E3B7C2A2161436 113406~|~1~|~1~|~01/NHS~|~Geotech plan split to include erosion work as well as pavement repairs due to failures.Full depth and partial depth pavement repairs. Addition of curb along existing shoulders. Guardrail and drainage work at various locations. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8F2B2509AE4727CC9F8C1B8D73CCE39269EAF2A2 106987~|~1~|~1~|~01/NFA~|~The County will construct improvements to the intersection of US 62 and CR 160 including the widening of the intersection, ventricle grade of CR160, and cul-de-sac on Vintage St.~|~01 - New Construction~|~1D05196C59D214F0E5A7693DACB2C1F9CFAA6BE0 113660~|~1~|~1~|~01/MPO~|~Resurfacing with pavement repair, addition of curb and gutter, replacement of storm sewer, addition of sidewalk and a shared use path on Broad Street from Central Avenue to Sandhill Road.~|~04 - Reconstruction - No Added Capacity~|~252AF15505C78AF57238B4F6DB35FE258177A168 113660~|~1~|~2~|~02/ENH~|~Plan split for bike/ped infrastructure improvements included within this project.~|~28 - Facilities for Pedestrians & Bicycles~|~C66D6578554970FFA50B15E77F58DDB2B433020C 88736~|~1~|~1~|~01/STR~|~Polyester pavement markers on CLA SR 56 from SLM 0.00 to 4.02 CHP on SR 55 from SLM 0.00 to 11.70 and on AUG SR 66 from 1.00 to 0.25.~|~21 - Safety~|~E9D3BCE78D24CA104694AD3E17C406152DA32AFF 107894~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 313 0.67-0.71. DSR NOB-002. Rural other federal aid funded 80% federal/20% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~711E0A833E1C9A0B5E733B30AC9B9060F7F70C07 97305~|~1~|~1~|~01/SAE~|~Replacement and Installation of approximately 12,000 linear feet of guardrail along various county roads in Clermont County.~|~21 - Safety~|~8B4252609AD3E0C83D5D87574963F1D51552040D 12056~|~1~|~1~|~01/STR~|~Brdg replacement. 0.40 MI. south of N&W Railroad. 6603033 PIK SR335 21.26 Intersect: Trib Of Wilson Run80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~D97F6187F978B85C5EBC015016600392191DD79F 121027~|~1~|~1~|~01/BRO/HUR~|~Replacement of SFN 3931781~|~10 - Bridge Replacement~|~D5AFF85EE7951A34F29812C49F03C7C6F1A2FD62 121027~|~1~|~2~|~02/BRO/HUR~|~CE for the replacement of SFN 3931781~|~17 - Construction Engineering~|~8A7FC29F00436BE8668D20B081D6857203CDE7BC 108637~|~1~|~1~|~01/SAF~|~Convert side-street stop condition to modern roundabout on Beckett Ridge Blvd at Lesourdsville West Chester Rd~|~21 - Safety~|~64FB0B60F338C7326D94AD5D0F670F5BC3356BC7 105534~|~1~|~3~|~03/STR~|~Items to be paid 100% by the Village of Cardington including OPWC funds~|~05 - 4R Maintenance - Resurfacing~|~90BC702039F2B8CF381EF0F1BFF327C25BC8A171 105534~|~1~|~1~|~01/STR~|~AC Overlay with Repairs:MRW-229-3.11-3.20, MRW-229-4.00-5.43AC Overlay without Repairs:MRW-529-0.00-8.31~|~05 - 4R Maintenance - Resurfacing~|~7AE5982A672AC23A47C5A382C6DD1A8E3B23BFF0 105534~|~1~|~2~|~02/STR~|~MRW-529-1.51 (5903483) and MRW-529-2.46 (5903513) SDC deck overlay using hydrodemolition~|~13 - Bridge Rehabilitation~|~BEAAF98729719F48BEE24F7058D1CDBC52746E3E 117567~|~1~|~1~|~01/S>2~|~Widening of SR-48~|~03 - Reconstruction - Added Capacity~|~909718C89580BD94DB9FC68970E5ADE6A7F9D49B 85233~|~1~|~2~|~02/SAE~|~Plan Split for the non-reimbursable utility (water work) in the project.~|~43 - Utilities~|~9F4EF597232C1C41DE567F7666B4D1B642DAF013 85233~|~1~|~1~|~01/SAE~|~Constructing a left turn lane westbound from sr125 to sr132~|~21 - Safety~|~AE0D74CB6B1D1820667BA1D53DFE6F7412D39B68 105200~|~1~|~3~|~03/SAF~|~Centerline rumble stripes.~|~21 - Safety~|~7712DCDB654100E82ECEEA30215A700988DE9849 105200~|~1~|~1~|~01/STR~|~Resurfacing on the Rural sections of the project.GRE-42 SLM 12.01 to 17.46~|~05 - 4R Maintenance - Resurfacing~|~EECDC7E711BB094275185D49CEBF2A9FC238A39E 105200~|~1~|~2~|~02/S>2~|~Resurfacing on the urban sections of the project: GRE-42 SLM 11.26 to 12.01~|~05 - 4R Maintenance - Resurfacing~|~4AC41966F1C87F00FADF91CA335163562CCD54C5 99493~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~A15DB23A13C87F19362C30714180BF1EB2F3CE16 126983~|~1~|~1~|~01/NHS~|~Pedestrian crossing improvements~|~21 - Safety~|~2EC2A87F0B23615E789B5C6681A78C8A26ABEC1E 98986~|~1~|~1~|~01/NHS~|~AUG US 33 16.73 to AUG US 33 16.88 convert the intersection of US 33 and Wapak-Fisher Road to an offset "T" intersection to improve safety at the intersection.~|~21 - Safety~|~7EFB287CB739FA6E4310465F5E2D8FFC75B3E573 117266~|~1~|~1~|~01/NFP~|~Added a split~|~17 - Construction Engineering~|~9C106E35632B70F74FBA88969B61A75CDAAE5659 118465~|~1~|~1~|~01/SAF~|~The project includes the EB and WB US 33 Ramp intersections. The Chauncey cutoff (at grade intersection) will be closed. Safety project to convert a stop-controlled intersection and a signal-controlled intersection into modern roundabouts.~|~21 - Safety~|~E13F2D2FAB4DFE2587FBD91E20F88E02AD93EB5A 7311~|~1~|~1~|~01/MPO~|~turn Tower Blvd into a 4 lane road~|~01 - New Construction~|~5A3022FB81F2BA937BC4CF4A21BAA007B2B9C728 122214~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-80-C~|~~|~E15CF890D2D56CA674B4045E6426E0DAD13EA5AD 120675~|~1~|~1~|~01/SAE~|~Construct new roundabout on US 224 and SR 225.~|~04 - Reconstruction - No Added Capacity~|~216A9E2AA19813BF91643195061F60E8B819C097 116443~|~1~|~1~|~01/NFP~|~Districtwide raised pavement marking installation/maintenance.~|~~|~7FEDFF5241EBE6B49F98EE4087925D09F32C56A5 109543~|~1~|~1~|~01/NFP~|~Construction of a new salt storage building in Gallia County GAL21.~|~44 - Other~|~DD96101734D246DF73E7CB11D16419B477834C26 117683~|~1~|~1~|~01/MPO~|~Plan Split for MPO Enhancements funds~|~28 - Facilities for Pedestrians & Bicycles~|~59E4BBD8C98B4F0E31A6B08C6228B66FC5A1B40A 117683~|~1~|~2~|~02/NFP~|~Plan split for locally funded work, including water line replacements~|~28 - Facilities for Pedestrians & Bicycles~|~984968F72DE295F9D3EBD4ECC1D3BED793B162A7 123734~|~1~|~1~|~01/NFP~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~61097F7802EC6FE577CF6C1FA13B63ACAA545A74 123769~|~1~|~1~|~01/BRO~|~Bridge Painting~|~47 - Bridge Preventive Maintenance~|~5389CDD65482B3FB49B9FA8A0774051D7403E4CB 90465~|~1~|~2~|~02/ENH/CANT~|~Streetscaping enhancements.~|~04 - Reconstruction - No Added Capacity~|~C84EDE3AB2D3E30DE8CFF99A51751238992A8883 90465~|~1~|~1~|~01/MPO/CANT~|~The re-alignment and reconstruction of 11th street to improve geometrics between Market Street to West of Cherry Avenue, includes new roundabout at Market St and resurfacing a portion of Cherry St and 11st/SR 43 in the City of Canton. ~|~04 - Reconstruction - No Added Capacity~|~A43BAFEB11E4506F1FEC4FC7FCF4ED1B51EE3A61 83014~|~1~|~1~|~01/STR~|~Two replacement bridges. 0102857 ADA SR125 0.41 Intersect: Sacremento Run0102881 ADA SR125 0.48 Intersect: Kirker Hollow StreamOn SR125, 0.95 mile east of the Brown County Line, it is proposed to replace two structures. SFN 0102857 & 0102881.SFN 0102881 is eligible for BR funds but only for rehab, not replace.80 fed/20 state.01/STR/BR/State~|~10 - Bridge Replacement~|~55CA512E4091B19D4012E7FCC6DDB7D0954D7C26 105747~|~1~|~1~|~01/STR~|~Plan split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~C2F858C43180B7286284E6F525310A3DD47B1E10 112226~|~1~|~1~|~01/NFP~|~D09 Auxiliary Markings (A) FY2026~|~21 - Safety~|~7AC408F5B1F7282FDDAB16053158BD42A1DDEF4F 98731~|~1~|~1~|~01/NFP~|~Turnpike Mitigation funds - Drainage~|~44 - Other~|~A911100F98EB63464F41DF8C5445EF78189C8A2E 119049~|~1~|~1~|~01/SAF~|~Intersection improvement of State Route 161 at Olentangy River Road.~|~21 - Safety~|~9FD3FBF4C80D1ED5B85B4CE4C5DA0646E388134C 124591~|~1~|~1~|~01/S>2~|~Major rehab of SR 3 from 1.650 to 5.398~|~04 - Reconstruction - No Added Capacity~|~89B9711CA1205D8DA2F5B6FD754632F47231604A 124591~|~1~|~2~|~02/S5K~|~Major rehab of SR 3 from Plumb Rd to the Sunbury corporation line~|~04 - Reconstruction - No Added Capacity~|~095BFE2C138E158D0F3C34DE2DD24CAC59BDD77D 117565~|~1~|~1~|~01/SAF~|~ODOT-Let - Safe Routes to School project - Safety funded 4HJ7 ~|~21 - Safety~|~4E82FCBB9C838BDEC6CA5155441C63BF75AE5A47 112407~|~1~|~1~|~01/SAF~|~Various pedestrian safety improvements~|~21 - Safety~|~6B3DDA35B786DE482ECE704ECC241F1BD13EEAAC 101817~|~1~|~1~|~01/IMS~|~Replace superstructure on two bridges, TUS-77 3343 (SFN 7903871) and TUS-77-3343 (SFN 7903901).~|~13 - Bridge Rehabilitation~|~EDF6B1836A968C991F63B1A39E3249514DB2DC30 102546~|~1~|~1~|~01/NHS~|~plan split for work on the NHS section:CLE-32: SLM 13.70-16.44~|~05 - 4R Maintenance - Resurfacing~|~AF7D7CB0C57B6BA2D884129B720093FA88AA7174 121516~|~1~|~1~|~01/SAF~|~Lighting replacement~|~21 - Safety~|~066C3A019E61287ABF568177D1EFCF803EC9469C 106378~|~1~|~1~|~01/BRF~|~Bridge replacement of E. 75th Street over Morgana Trail~|~10 - Bridge Replacement~|~19B2047AD88FFB929A40CF9CEC232D4574116966 106378~|~1~|~3~|~03/BRF~|~Plan split for First Energy utility work.~|~10 - Bridge Replacement~|~CA8F8F9077818A1FF1274A61C57A6666ACF9517B 106378~|~1~|~4~|~04/BRF~|~Plan split for Dominion Energy Ohio utility work.~|~10 - Bridge Replacement~|~3F43E4C5639296EE7B893E361D53CF0F244B874F 106378~|~1~|~6~|~06/BRF~|~Plan split for Crown Castle utility work.~|~10 - Bridge Replacement~|~A33D9EE8F4632719C6C932CB773C352502775275 106378~|~1~|~2~|~02/BRF~|~Plan split for AT&T OHIO utility work has been removed from the project.~|~10 - Bridge Replacement~|~56A482B6DCC269065296012CB2311C606142A594 106378~|~1~|~5~|~05/BRF~|~Plan split for Verizon utility work has been removed from the project.~|~10 - Bridge Replacement~|~9A8746FEE396015C6590FABD4122D6DCE96E518A 106378~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~9E19CE11437EBE42F74F9B6DFEA14D9F8A6EF8E2 102367~|~1~|~1~|~01/S<2~|~Asphalt resurfacing from SLM 12.97 to 14.84~|~05 - 4R Maintenance - Resurfacing~|~917DFC8351DECD2E278E5A655F6AD08131EAEB26 102367~|~1~|~2~|~02/STR~|~Asphalt resurfacing from SLM 14.84 to 14.98~|~05 - 4R Maintenance - Resurfacing~|~09885634400E9FA949674C04E3644A74C34F0720 110725~|~1~|~1~|~01/STR~|~Slide Repair ROS-001 ROS CR 167 10.00~|~04 - Reconstruction - No Added Capacity~|~7FCC9D252AA5B6199FB91D64A19FB42BF1461BF0 109289~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 12.62. 100% State ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E635D2CFD2E6A152337E65F1A1BFF6F0E07326BE 115867~|~1~|~1~|~01/SAE~|~Guardrail project on various Richland County routes ~|~21 - Safety~|~165562543A49369F37D4BB77EA7CED348442023C 98835~|~1~|~1~|~01/IMS~|~Split for pavement markings~|~~|~8E1539DC1A3490E2583C08E4A0984CB963A555A7 121388~|~1~|~1~|~01/SAF~|~Plan split for traffic signals~|~21 - Safety~|~AE55805AD5E575ECAA84BF786BCAF9358FDF0C3B 113847~|~1~|~1~|~01/NFP~|~All work in this plan split. The local match and any funds needed after the CEAO Federal/State Exchange Program cap is reached will be provided by Allen County.~|~10 - Bridge Replacement~|~0E8C2CB86DD080A2B0DB511797A2FE68A4C5F37C 96430~|~1~|~1~|~01/SAF~|~Construction of sidewalk along Struthers Liberty Road, from Notre Dame Drive to Tenney Avenue. Also, along the South side of Tenney Avenue, in the City of Campbell, Mahoning County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~B770CC3955A15DEC0815CB04B2A26057FF850935 84268~|~1~|~1~|~01/IMS~|~Replace superstructure on two Bridges, TUS-77-1785 L& R (SFNs 7902670, 7902646). Repair/Rehab substructure units and convert abutments to semi-integral. Raise bridge to obtain additional vertical clearance~|~13 - Bridge Rehabilitation~|~B192080D8E344A1A16D9F0F4634685E5B15DF196 98879~|~1~|~1~|~01/IMS~|~Split for bridge repair work~|~13 - Bridge Rehabilitation~|~F43FDE1FE2DEBB495E27CF43955FE6B016AE5554 90638~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A3A4B2904E43981DA4502110CABA237BA34940E6 108893~|~1~|~1~|~01/S>2~|~Upgrades to vehicle detection, signal cabinets, controllers, and communications equipment on various routes~|~21 - Safety~|~C4F5EE42AF8722EC0D16E14D3367198113EC0B99 111437~|~1~|~2~|~02/S<2~|~Bridge Work:(SFN 2229080) ERI-IR-80-05.090(NO WORK) (SFN 2229447) ERI-SR-13-02.920(ERI-IR-80-13.180)Preventive Maintenance: Expansion joint repair/replacement (048) (SFN 2202425) ERI-SR-13-06.520 (ERI-SR-2-18.230)Preventive Maintenance: Expansion joint repair/replacement (048) Reactive Maintenance: Exp jt repair/repl (048) (SFN 2202409) ERI-SR-13-03.670Reactive Maintenance:Exp jt repair/repl (048) (SFN 2202670) ERI-SR-99-00.960Preventive Maintenance: Expansion joint repair/replacement (048) Reactive Maintenance: Deck patching(conc) (049) Exp jt repair/repl (048) (SFN 2202794) ERI-SR-99-03.800Preventive Maintenance: Expansion joint repair/replacement (048) Reactive Maintenance: Exp jt repair/repl (048) ~|~13 - Bridge Rehabilitation~|~F516939352B20C8E6E482C4D3993DE24A2BC9832 111437~|~1~|~3~|~03/SAF~|~Safety Funds for rumble stripes.~|~21 - Safety~|~DEDF3B38247166BA618C3E4B7C9DC0C1B963C28D 111437~|~1~|~4~|~04/SAF~|~Safety Funds for US-250/13 Radar.~|~21 - Safety~|~0BC57F0B8DCF721884E3EEC15B510F672DBAA1E5 111437~|~1~|~1~|~01/S<2~|~Fine Graded Polymer AC Overlay (Smoothseal) ERI-13-1.84 (US 250) to 6.92 (Huron Corp Limit) ERI-99-0.00 (Huron County Line) to 4.73 (SR 4)~|~05 - 4R Maintenance - Resurfacing~|~989F9F3624B8DE1DEE185BE15683436C5900AB67 125840~|~1~|~1~|~01/SAF~|~Plan split for guardrail repair in D8~|~21 - Safety~|~013564923A7FF2C004FFAE43F78BAA121E58B119 125962~|~1~|~1~|~01/BRO~|~Overlay on FRA-435-0105R~|~~|~CDDF55E66ADAE3919B7C737778CD557B8AC0F82C 100495~|~1~|~1~|~01/STR~|~Crack dealing various routes in District 11~|~99 - State Preventative Maintenance~|~38FA35C4D57EC6A99CCB6059C7B4F25B20250B5B 87631~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Fast Dry Striping within District 5 on the OFAH-Rural Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~74E07A57AEA19ED58F3F6C2025C508521068B6B8 87631~|~1~|~2~|~02/NHS~|~"02/NHS/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Fast Dry Striping within District 5 on the NHS System~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A31C7AFB919BFBADDBA46F6EC24F3F761554EA1 87631~|~1~|~3~|~03/S<2~|~"03/S<2/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Fast Dry Striping within District 5 on the OFAH-Urban Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7546067AF055A3C69A64797A4799D6024CD25F3 87631~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Fast Dry within District 5 on the NOFAS-Rural Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DCA5245D050101EC06EF31E434DF95FCD5F4A76B 87631~|~1~|~5~|~05/IMS~|~"05/IMS/OT/ " - District Preservation - 4PF7 (90% Federal) / 4PS7 (10% State) - Annual contract for placement of Fast Dry Striping within District 5 on the Interstate Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~425F08C89355B86D5821682F51439FD22330F7EC 93749~|~1~|~3~|~03/IMS~|~Plan Split to cover pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~2018A6C5ED85D19823AEBA88C0992D8BC5047DA9 93749~|~1~|~1~|~01/IMS~|~Resurfacing of IR76 from slm 11.44 to slm 11.80 and the resurfacing of IR77 from slm 15.18 to slm 17.20, in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~8BD80197079F92C45F3627397E545887766B0A44 93749~|~1~|~2~|~02/IMS~|~Overlay of two structures. SFN# 7706006, SUM-IR76-11.50L and SFN# 7606030, SUM-IR76-11.52R. In the City of Akron, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~C5E7286D0ACF09BCCB017DE8C449BCC598F1E099 125390~|~1~|~1~|~01/STR~|~Resurfacing and related work on SR 265.~|~05 - 4R Maintenance - Resurfacing~|~B68D890534BA15D17B54725399141CCED13EDC7C 98402~|~1~|~1~|~01/NHS~|~Crack sealing on NHS routes.BUT-SR 4 SLM 17.76 to 19.09BUT-SR 4 SLM 23.30 to 26.39BUT-SR 4 SLM 26.39 to 26.77WAR-US 42 SLM 16.57 to 17.95~|~99 - State Preventative Maintenance~|~540B58EFEF1040990D74F119C453BDD5639C9A54 98402~|~1~|~2~|~02/S>2~|~Crack sealing on Large Urban routes.BUT-US 42 SLM 0.00 to 3.33~|~99 - State Preventative Maintenance~|~76E27B135BB0C799C5C3F59C5F8748E6E167231F 98402~|~1~|~3~|~03/S<2~|~Crack sealing on Small Urban routes.BUT-SR 73 SLM 16.76 to 18.51~|~99 - State Preventative Maintenance~|~B72292631F8A961A504F14BD31ABB551B89B427E 98402~|~1~|~4~|~04/STR~|~Crack sealing on rural routes.BUT-SR 122 SLM 3.86 to 5.74WAR-US 42 SLM 13.40 to 16.57~|~99 - State Preventative Maintenance~|~5C5A9C979D1DB4E3C62B272C8A3E355337187E88 113119~|~1~|~1~|~01/NFP~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~F7C9A5242EAC1A7790261CB8E055FEA6B9D8A0EA 125824~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~F02971EE5FD6E11B25CB6A9A46050E962A1BC6F1 94121~|~1~|~1~|~01/NHS/ADA~|~It is proposed to perform a deck overlay/ deck replacement project on the following structures: ADA-32-16.99L 0100331ADA-32-16.99R 0100366ADA-32-19.42L 0100420ADA-32-19.42R 0100455~|~13 - Bridge Rehabilitation~|~1095733640C88C2F79E50C43BF133D246CD3BC4F 89450~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Bridge replacement over Cross Creek; 0.70 miles south of CR74/CR28 intersection.~|~10 - Bridge Replacement~|~717F5A295D6BCBB3AC6FAFE80FEEAAB5D44745ED 117701~|~1~|~1~|~01/STR~|~added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C98F1443652A659ED718B2884F20658FD5111B8D 125186~|~1~|~1~|~01/IMS~|~Landsccape maintenance along the Interstate~|~31 - Landscaping & Other Scenic Beautification~|~FE37980974693CEE39121DF10B40A84360A13A2C 126205~|~1~|~1~|~01/IMS~|~Lighting~|~44 - Other~|~790A32F6620AA3FAF87A4C0817C36152F1B6BBA0 109330~|~1~|~1~|~01/NFA~|~ODNR Resurface and maintenance project in Maumee Bay State Park~|~44 - Other~|~68B1AE02B795B991F48509D0601A65C52440C0B9 90373~|~1~|~1~|~01/CMQ~|~US 62/224 Canield Signals~|~21 - Safety~|~E1007BB715BC074FA6F5836BB703F6FD3BE46DD2 125423~|~1~|~1~|~01/NFP~|~PM FY32 plan split.~|~21 - Safety~|~A983F6ADE30A32F913DB4DB27689593CD0A09CCD 111129~|~1~|~1~|~01/S<2~|~Lighting project~|~44 - Other~|~88D56835DAA10018BC2CCC56AC98442E591AF7FA 111129~|~2~|~2~|~02/S<2~|~Adding a camera using TSMO funds.~|~44 - Other~|~7B7BEF864A9B410374A2E36AEC6B52B2A4957C31 100628~|~1~|~1~|~01/STR~|~Chip sealing TUS-93 from Sugarcreek to Dundee (SR 516).~|~05 - 4R Maintenance - Resurfacing~|~3428D08072BC3F85F448B31BC8FC71355647ECC0 126961~|~1~|~1~|~01/IMS~|~Repair and replacement of noise walls on various routes in District 8.~|~44 - Other~|~5E15A42C3395C587D438CD6C21534770BA5B2958 102328~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~2B9BD50BE62025EFFABD9F5B50150B8371E3C088 102328~|~1~|~1~|~01/NHS~|~Concrete pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~888393506542D0C02E24DF78B8FC1259F6988EDD 102328~|~1~|~2~|~02/IMS~|~Replacing 4 westbound overhead signs on IR 80 leading to the Ohio Turnpike.~|~21 - Safety~|~5506044BCA2AC6F4BB978DAA7277053DC6BC0C84 85311~|~1~|~1~|~01/BRF~|~Bridge relocation~|~21 - Safety~|~523F85A93A3F066F5DDD0C08B5FA2B7DE6864E1C 126324~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~9364FA4F615B4F00B395C650D2C32782BDFD75B8 106289~|~1~|~1~|~01/SAF~|~Install cable median barrier on I75 in SHE & AUG counties.~|~21 - Safety~|~0F27A4269EA4BE4C73F55D5A5925CF66CAB5EDD0 92747~|~1~|~3~|~03/SAF~|~Addition of turn lanes.~|~05 - 4R Maintenance - Resurfacing~|~2D0200ACD70720284C181C52DE144FC4C7636D51 92747~|~1~|~2~|~02/NHS~|~Pavement resurfacing on WOO-20.~|~05 - 4R Maintenance - Resurfacing~|~36D733977A9C14738DF6E336F81815FF2327E5A7 92747~|~1~|~4~|~04/NFP~|~Libbey Rd~|~05 - 4R Maintenance - Resurfacing~|~84251858806A6A2D5BE02350C239D8F837433211 92747~|~2~|~5~|~05/NHS~|~8701083 WOO US20 5.67 over Cedart Creek Trib8701148 WOO US20 7.61 Intersect: Henry Creek~|~10 - Bridge Replacement~|~145B468BB515F8D0EA628ACB0F3A3BD638CF256B 92747~|~1~|~1~|~01/NHS~|~8701237 WOO-US20-10.51~|~10 - Bridge Replacement~|~B2EBBEE6752987E2A44B199BBF7C42B4E62E29D1 92747~|~1~|~6~|~06/SAF~|~Safety above cap~|~~|~5C0FDE23B97D3613FF73E26D7F3002BD3AF8ADF6 87436~|~1~|~1~|~01/S<2~|~Culvert Replacement ERI-006-23.79~|~44 - Other~|~289CF3EAC6DA5355817D58AE394EA82D8E6F5EC1 112045~|~1~|~1~|~01/NHS~|~All work in this project.~|~~|~0FC846D05F5E46B0635D738676AC356982928D4C 96647~|~1~|~2~|~02/NFP~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. WAS 530 0.00-7.86. Not on any federal route funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~6A29C8687A6A81036EBE8CA6083CDA77B5A00965 96647~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. MRG 83 0.00-7.48 and WAS 83 1.35-1.99. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~39453057317AC42A3F9AEEF4B775307A53F97E1E 108641~|~1~|~1~|~01/SAF~|~Stripe the outside shoulders to provide bike lanes on US Route 52 from Five Mile Road to Adamson Road.~|~28 - Facilities for Pedestrians & Bicycles~|~0B9E4A5609276923D4924504D1FB4D577A5936F8 106121~|~1~|~1~|~01/S>2~|~Recon to include new pavement, curb sidewalk, lights and catch basins in the City of Dayton on Salem Avenue Riverview to North.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A7D807F7AB2A3B8B8A38C3AC1A5D9C4AEC1D38C4 106121~|~1~|~2~|~02/CMQ~|~CR 249 OM 038 This Project provides a two way bike path~|~~|~E6F8CD4EF719FEA3573D3040D00AD78AB8692A60 109072~|~1~|~1~|~01/STR~|~Work on US 42 from S drive of Speedway Truck Stop (SLM 12.35) to the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81). Pavement and shoulder replacement for the existing width.~|~04 - Reconstruction - No Added Capacity~|~CB624E91CB8711BF232C5D936253C5503D0AA91E 109072~|~1~|~4~|~04/NHS~|~Work on US 42 from the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81) to N drive of Pilot travel Center (SLM 13.43). Widening pavement to provide TWLT lane and widened shoulders. Minor ramp improvements at IR 70.~|~04 - Reconstruction - No Added Capacity~|~9928AB01890B43D3BA2A8906F5E3EB2341E6F406 109072~|~1~|~2~|~02/STR~|~Work on US 42 from S drive of Speedway Truck Stop (SLM 12.35) to the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81). Widening pavement to provide TWLT lane and widened shoulders. Minor ramp improvements at IR 70.~|~04 - Reconstruction - No Added Capacity~|~C11C82C5E32286490218D46EBC201786DA49E6A7 109072~|~1~|~3~|~03/NHS~|~Work on US 42 from the beginning of the ramp taper for the US 42 NB to IR 70 EB ramp (SLM 12.81) to N drive of Pilot Travel Center (SLM 13.43). Pavement and shoulder replacement for the existing width.~|~04 - Reconstruction - No Added Capacity~|~9590D48BD57C8154C6087AC4EF24D60DD54DD79B 97172~|~1~|~1~|~01/IMS~|~SFN AUG-75-0545/0602159 - repair superstructure damaged by vehicle strike. Possible heat straightening, gouge repair and cross frame repairs.~|~13 - Bridge Rehabilitation~|~DC7ABDF623DD2B26B8C34011C7BBF0C7489A3ECB 117383~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~~|~6D00988D6B86A6E0F7E4D4FCF73DAEE4F3094775 107719~|~1~|~1~|~01/STR~|~SFN 7202466.~|~10 - Bridge Replacement~|~A805A8379EB9AB6C99AF1720DDF55AC1E5C448CE 121508~|~1~|~1~|~01/IMS~|~Concrete pavement repairs on CLE-275~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F5AF8DF1AC7C4E687B94383014791F1BDC4D0B93 121338~|~1~|~1~|~01/NHS~|~FRA SR 315~|~05 - 4R Maintenance - Resurfacing~|~81974925F365EF29B9C60F1FD3FE62F347852A4F 82934~|~1~|~3~|~03/S>2~|~100% City of Canton Sanitary costs.~|~43 - Utilities~|~B289F7647E0EC29773C47F729A13B91D2449886E 82934~|~1~|~2~|~02/S>2~|~100% Dominion East Ohio utility costs.~|~43 - Utilities~|~CB084218413ECCA38065D5DA56E2A6B31C0D9A3B 82934~|~1~|~1~|~01/BRO~|~Rehab of sfn# 7600933, STA-172-15.57 over Branch of Nimishillen Creek.~|~13 - Bridge Rehabilitation~|~D504902DC171CF053695E1F7566BFF6BC7D1E9B5 110839~|~1~|~1~|~01/SAE~|~Safety funds split~|~21 - Safety~|~ED9CAEE3E0C04226A95A109AA1DEF674CD7BAFCB 117470~|~1~|~1~|~01/MPO/STCE~|~Resurfacing, Everhard Rd.~|~05 - 4R Maintenance - Resurfacing~|~737CB5BE825E647A66ED8A0E92A412D7B03083CF 117470~|~2~|~2~|~02/MPO/STCE~|~Resurfacing, Cleveland Ave.~|~05 - 4R Maintenance - Resurfacing~|~E21EC5674CEEB8E418A93A7FE36FF182FE133CB6 121068~|~1~|~1~|~01/NHS~|~Plan split for eligible rehabilitation work. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AB0BD50F2F7F0F7D1AB288D72DE9AF318133A1AF 92112~|~1~|~1~|~01/IMS~|~LUC-75~|~05 - 4R Maintenance - Resurfacing~|~68ADA6CD589F8B006382FA3674757C02A14882E8 103252~|~1~|~1~|~01/IMS~|~Overlay with repairs on Interstate route.~|~05 - 4R Maintenance - Resurfacing~|~E6C63BBFD9AC0F0681AB3B91A545AC0E69B68E95 124004~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~B5505B636D58DF6F5912CC6B7D61B32DEED9AD03 117510~|~1~|~1~|~01/BRO~|~Plan split for bridge replacement.~|~10 - Bridge Replacement~|~419987A58A4E0986E70A5EB2D14B9E1B3A39E46B 117510~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~10 - Bridge Replacement~|~B57E754C689383EF40981F56925DE66F51CC04CB 101627~|~1~|~1~|~01/S<2~|~STP <200,000 for AC Overlay without repairs on the following sections: FAY-22-10.47-10.98, PIC-104-15.68-16.62, PIC-104-20.70-21.47~|~05 - 4R Maintenance - Resurfacing~|~F894A2ED33D93BA60430DA9BBE7F2B5E952AD767 101627~|~1~|~2~|~02/STR~|~STP Rural for AC Overlay without repairs on the following routes: FAY-22-10.98-17.62, PIC-104-10.44-15.68, PIC-104-16.62-20.70, PIC-22-0.00-0.20~|~05 - 4R Maintenance - Resurfacing~|~2A3664AE4203FF97BF3BC672F20EB1AC2C3369C4 98604~|~1~|~1~|~01/NFP~|~Plan split for pavement work throughout the project.~|~05 - 4R Maintenance - Resurfacing~|~EC5120C5083FCFD62CD47530C402EB09172D73C1 98604~|~1~|~2~|~02/NFA~|~Paving of the Unionville facility~|~05 - 4R Maintenance - Resurfacing~|~A12D3907F03F4F377664DE671150B66AC5B67BEA 94016~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~~|~231E4F2B171697A8736D495C25EEBD37AB786D6C 94016~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span.~|~~|~38A3F9EAEABD5F2C85FB4170FFC67A89EF8E4E94 94016~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~7D6A2DBFEA070FA550A61F73205B513E078350A5 24841~|~1~|~1~|~01/BRO~|~Funding plan split to program project. Update after scope of work is known.~|~~|~1B39641F0CAC999E8942F1D9F6CDBCBC765C0800 88034~|~1~|~1~|~01/SAF~|~Replace high pressure sodium light fixtures with LED light fixtures at the SR 32/SR133 interchange in Clermont County.~|~~|~8B9CE27F6F1028014574AD453CD942EBBDD24ECC 112183~|~1~|~1~|~01/STR~|~Chip sealing~|~05 - 4R Maintenance - Resurfacing~|~AB803ADB4C979568DE14820CE2B7F379D76B73D6 112183~|~2~|~2~|~02/STR~|~ODNR Driveway~|~05 - 4R Maintenance - Resurfacing~|~D8F44BC6425FB856E5DCC8FA30606B2AB51A763F 94800~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 0.00 to 0.09~|~~|~38506C197BDE4A6CEC8524364A36D2365F08A47D 114983~|~1~|~1~|~01/IMS~|~Pavement Markings~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D79791B161FA4E2A50700D82E00B41EC97E4099D 18741~|~1~|~1~|~01/BRO~|~80/20 funding split for use with federal BR funds.~|~13 - Bridge Rehabilitation~|~5A8FE0B9743041514270E60FE2A9C41C846D16DF 120364~|~1~|~1~|~01/NFP~|~Split for tree removal work~|~99 - State Preventative Maintenance~|~85238B3CE9FB8123D72ABA699B278469802439E7 103156~|~1~|~1~|~01/NFA~|~The TID is constructing the Briarfield Blvd/Salisbury Road/Brandyway Lane Project including, but not limited to, roadwork improvements by realignment of the Briarfireld Blvd., Brandyway Lane, Salisbury Road intersection by extension of the Briarfield Blvd. north of Salisbury Road, extending east/west Brandy lane to the extended Briarfield Blvd., removal of existing north / south Brandyway Lane, extension of the existing westbound Salisbury Road to northbound Briarfield Blvd. left turn lane , revisions to optimize the Briarfield Blvd at Salisbury Road traffic signal, and other related roadway improvements.~|~01 - New Construction~|~A62167ACECBA76E8F9792D5C3599C1B4D8D767FA 98193~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS Mus-22-(01.16-07.95)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6761B7002F047D93C17329DAD2BF1C56AED8530E 98193~|~1~|~2~|~02/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban Cos-83-(12.67-13.69) and Lic-79-(16.25-17.18)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3BBFA1E9C9E513C4828B7ACEA055A8110E7B971A 98193~|~1~|~3~|~03/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routes Cos-83-(13.67-26.68), Cos-93-(12.01-22.67), Fai-158-(02.48-15.83), Fai-256-(14.10-24.63), Kno-62-(00.00-04.29), Lic-62-(17.49-20.64), Lic-158-(00.00-02.28), Mus-22-(00.00-01.16), Per-256-(00.00-00.16)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~06BED3A400C65253693D7CD482850C82C32862B8 98193~|~1~|~4~|~04/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes Per-188-(00.00-04.48), Per-757-(00.00-05.68)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~182EE04885FE6393450576E5293C827AA0DB2312 113730~|~1~|~1~|~01/SAF~|~Construct a mini roundabout at Ferris Road and Walford Street in Columbus.~|~21 - Safety~|~A8FCE9F2B95E594F9B88241AF3ADFE50762098A4 124772~|~1~|~1~|~01/SAE~|~100% CEAO HSIP (4HB7) funded for eligible expenses~|~21 - Safety~|~3C504BF8FE6571B204AC1AAF435496978BF46620 101941~|~1~|~1~|~01/NHS~|~Split for pavement replacement~|~04 - Reconstruction - No Added Capacity~|~15BF59E5B28AEB4FB6BA338AB502F3E2ACE75C54 101941~|~1~|~2~|~02/NFP~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~97F6E6654CEC2EF3389B63DC152F91A14CA438DF 76745~|~1~|~1~|~01/IMS~|~100% UNFU funding~|~~|~87F941C56A753147577559C4889A1EE0B8158EBA 118923~|~1~|~1~|~01/S>2~|~conduit linked~|~17 - Construction Engineering~|~26DDE143B2DB6AF0EEAB463AF13643B0DE36C72F 118923~|~1~|~2~|~02/S>2~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~382A3064BB962543151E0596DDC6F8AC3A858BC5 118923~|~1~|~3~|~03/NHS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~8E22D7A1D0E060A634396961382E0C4A79AD2117 121791~|~1~|~1~|~01/NFP~|~PM on various county routes.~|~21 - Safety~|~17C098FD1C2E05C42E3343A6EA3C255F2B0788B4 110483~|~1~|~1~|~01/SAE~|~Project to upgrade the signal by installing mast arms, backplates, and advanced detection~|~21 - Safety~|~B3DB89762A1BAC9EF4A37CE7CB44FF40F85B0D19 110483~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~A7D124BF81DCED03EC3A6EFB89122B8B52DC6A3F 109627~|~1~|~1~|~01/NHS~|~Emergency repair on BRO 52 2.51~|~04 - Reconstruction - No Added Capacity~|~8DFA2E61C156DCE7F36183547CE7B2C20B948F0E 101426~|~1~|~1~|~01/NHS~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~1482F91AB3E4086408FB6F8002FCA5B83708BB19 114932~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~B4483E2B7DF435D0028AC45C8C8DFE9A02FF0DA0 87783~|~1~|~1~|~01/ERD/Akrn~|~Install new traffic signalization equipment. Including: new poles, pedestrian signals, push buttons, street name signs, video cameras, emergency pre-emption, and fiber optic interconnect.~|~21 - Safety~|~EE2F6C72FE3C90EA055429C172543BF4CF5B77C9 102662~|~1~|~1~|~01/STR~|~Landslide repair.~|~04 - Reconstruction - No Added Capacity~|~014D121F979F54A93270211BEA671ABB9264B079 109200~|~1~|~1~|~01/STR~|~Slide repairROS 41 5.50~|~04 - Reconstruction - No Added Capacity~|~3BAE1F2134A0BA8F986E13CD5A9A8CCE5E9731A6 125707~|~1~|~1~|~01/S50~|~Install enhanced pedestrian crosswalk on Jim Campbell Blvd (MR 726) in the City of Huron. The work will include rapid flashing beacons (RRFBs) activated by push buttons and passive radar detection, lighting on RRFB assemblies, a high visibility pedestrian crossing, pedestrian signage, and associated curb ramp/sidewalk tie-ins. ~|~21 - Safety~|~01639E00A475DCEF984AC5E6BA7C948513A2F4E6 84381~|~1~|~1~|~01/NFP~|~2 year construction inspection project~|~17 - Construction Engineering~|~00837AF194DEC5FFE5EB797923C182DBD6D83A2C 121035~|~1~|~1~|~01/NFP~|~Guardrail work~|~44 - Other~|~721C135AB84C822D1C2F2670158D8E29238CCCCD 126509~|~1~|~1~|~01/SAF~|~Upgrade pavement markings ~|~21 - Safety~|~201987309062EAF8CEE0475F1801ACFBC1BED5F0 90915~|~1~|~1~|~01/STR~|~District Allocation - 80/20~|~10 - Bridge Replacement~|~20793C31D12562F8C209ED8CAB0A96EF1EC1F63F 98140~|~1~|~2~|~02/STR~|~SCI 253 0.00 to 0.56~|~05 - 4R Maintenance - Resurfacing~|~155F414998303DF1D1CFF4136BA60C4A5E951CD5 98140~|~1~|~3~|~03/NHS~|~SFN 7304757~|~47 - Bridge Preventive Maintenance~|~B8A835DAA97866422CEB9F3B7EB4A4BD5DC967D0 98140~|~1~|~1~|~01/STR~|~Bridge Repair SFN 7304749 & 7304722~|~47 - Bridge Preventive Maintenance~|~59869FF2D7B42FCCFC034E395AF061990757A3CC 98140~|~1~|~4~|~04/STR~|~Lighting.~|~21 - Safety~|~2EFDD15170F4B1FB23C6E0F9FC9E3ED25E1EA9C8 98140~|~1~|~5~|~05/NHS~|~Paving for ramps on US 52.~|~05 - 4R Maintenance - Resurfacing~|~9EC87FB3D6BA50A4955CA2803F5F3D526BAC7410 124121~|~1~|~1~|~01/NFP~|~Plan split for electrical maintenance work~|~47 - Bridge Preventive Maintenance~|~801A1FF4E442A43B3D40DB87132FABE8CCA0D472 112566~|~1~|~1~|~01/NFP~|~PM plan split~|~21 - Safety~|~8FB4F56A9D8949D23899F15C292B81EA8E8F1E07 110700~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~3FB8944EC7735B141A179C4EF99E2980BDE148D0 110700~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~04AE1A96BA5DE298A1D4C3204EF45556D72669F0 111007~|~1~|~1~|~01/SAF~|~Construct roundabout on POR SR 82 and Chamberlain.~|~21 - Safety~|~D6AA055EBD967ED0DBB530ABB9990377E65440C3 111007~|~1~|~2~|~02/STR~|~Resurfacing POR SR 82 from 5.84 to 6.14.~|~05 - 4R Maintenance - Resurfacing~|~5A6B629F9357C03933DE160931E3C35EE8952D28 111007~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~~|~7DBAEFE7150B64926B11D14EC42330A539F7D2D0 88521~|~1~|~1~|~01/STR~|~Resurface SEN SR19 0-6.07~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E739B887A5B10D28B488AE12AE378D0DC4277627 92421~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds SAC 4PS7.~|~21 - Safety~|~6DE67D6CC15AE84CF6C1F704AF54804AF3BC2C25 95707~|~1~|~2~|~02/NHS~|~Spot resurfacing and pavement repairs on COL-30 and JEF-22.~|~05 - 4R Maintenance - Resurfacing~|~1184B4302709C4BCE6D8CBE7EDCAD9BF9B98ABA3 95707~|~1~|~1~|~01/STR~|~Spot resurfacing of various routes in District 11.~|~05 - 4R Maintenance - Resurfacing~|~DA48347FF32489E174FA9E3FEA7C2780964F8E4A 93488~|~1~|~1~|~01/NFP~|~Plan Split for 4MA7/facility funding for chiller replacement~|~~|~87F6224F3E8262C2321FD1BDFECF649B14D599BF 101511~|~1~|~1~|~01/SAE~|~Installation of new and upgrade of substandard guardrail on various county roads in Clinton County.~|~21 - Safety~|~399E15995349684481CB814F6CA5CFAC29779088 89308~|~1~|~1~|~01/MPO~|~ Project includes widening of Liberty Fairfield Road from 0.28 miles N of SR-4 to 0.15 miles N of the Great Miami River to connect two previously federally funded projects that are complete at the north and south ends of the proposed improvements. Improvements include replacement of a bridge size CMP culvert with a concrete box culvert.~|~21 - Safety~|~B84E93B7867D188D0DA5A95F6348B22962825846 124808~|~1~|~1~|~01/NFP~|~Bridge work on various structures in District 5.~|~47 - Bridge Preventive Maintenance~|~9A1AB06F7C4683611261FD2EE99EBD12D8EF2BB7 123056~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~15BEC22A6A1E11AD3C37961FB2CC695A00C4AF7D 116596~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F04D9B0DD37A1F1F19ACBDF0D4A7BDDD37E156F8 114219~|~1~|~1~|~01/NFP~|~Culvert repair and replacements.~|~04 - Reconstruction - No Added Capacity~|~BBD713602F68687116A8C8880804D1E37EDF2029 110854~|~1~|~1~|~01/STR~|~Culvert liner project. MRG 266 2.73. 80% Federal and 20% State funds.~|~04 - Reconstruction - No Added Capacity~|~597B6029260C6F2A1ABAC4C5B6EAB509F687D4B6 123552~|~1~|~1~|~01/BRF~|~Replacement of Bridge No CLE-CR 54-0016 (SFN: 1358030) which carries Glancy Corner Marathon Road over Pleasant Run.~|~10 - Bridge Replacement~|~B4940CD62CD5D713CFB1D39EFDC57E7B33EADCBD 100580~|~1~|~1~|~01/NFP~|~D09 GAP FY21~|~05 - 4R Maintenance - Resurfacing~|~A5E537FCAE3337041C07FF35206B8A063E60D736 118508~|~1~|~1~|~01/NHS~|~Rockfall hazard remediation in the west bound lanes of MEG 33 7.61-7.73 and 7.87-7.94.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~740E6EFA252684BFCABACB9FFC952A86DA0A730E 97680~|~1~|~1~|~01/STR~|~Minor Rehab SCI US 23 10.57-11.48~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~473C1D08389686ED30324C4DC26E06F75666419E 97680~|~1~|~2~|~02/SAE~|~Installing matrix stop bar detection on all approaches at Scioto Street.~|~21 - Safety~|~67CB5D8629830E94B35EA142AAE30C17AA3D4664 107767~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades on MAH IR 680/Midlothian, TRU SR 5/82 at US 422, Perkins-Jones and Elm Road interchanges.~|~21 - Safety~|~68804113290A726B2CACD3DEEB957FD111D42F83 112374~|~1~|~1~|~01/BRO~|~Rehabilitate existing corrugated metal pipe carrying SR 149 over an unnamed tributary of McMahon Creek.~|~04 - Reconstruction - No Added Capacity~|~BEEE59815C151843AF8F44D366EEF7F47216685D 122558~|~1~|~1~|~01/NFP~|~Resurfacing in Zanesville State Nursery.~|~05 - 4R Maintenance - Resurfacing~|~2C121A3473070E6CA9C8745401157000CB9F76CC 77930~|~1~|~1~|~01/S>2~|~Resurfacing a portion of US 42 in Hamilton County. ~|~05 - 4R Maintenance - Resurfacing~|~E689E989A5AE05135E9D719621AB2922108C77B5 114147~|~1~|~1~|~01/SAF~|~ITS system maintenance throughout District 6~|~21 - Safety~|~E1D715F9D777F0D54261F638609787D01BFEDE31 98701~|~1~|~1~|~01/MPO~|~Resurfacing Akron-Cleveland Rd (CR 16) from Village of Boston Heights south corp limit to SR 303.~|~05 - 4R Maintenance - Resurfacing~|~5D299E62F0D78C45E285D11348B8C44AFEEE65A6 97779~|~1~|~1~|~01/NFA~|~State 14/Enterprise Pkwy improvements for access to the industrial park~|~44 - Other~|~CD7AE8D127D2FE2534C5B51FC8EB4B85A854E87D 100942~|~1~|~1~|~01/STR~|~This plan split is for the rural route.~|~05 - 4R Maintenance - Resurfacing~|~7419E5BEC6164101779443B0ADD6A75AEC3136B5 100942~|~1~|~2~|~02/S<2~|~This plan split is for the small urban route.~|~05 - 4R Maintenance - Resurfacing~|~89D70B5D1B03A1CE44662C10F051FB3F07659A4B 100942~|~1~|~3~|~03/NHS~|~This plan split is for the NHS section.~|~05 - 4R Maintenance - Resurfacing~|~0776E78664EA5FCF278F65ACAE83D298D9FED634 120890~|~1~|~1~|~01/NFA~|~Widen & pave river access road~|~44 - Other~|~569C356536D60C3D6B8F027964B9B0011DE24B9D 92173~|~1~|~1~|~01/IMS~|~Statewide ITS maintenance and upgrade~|~44 - Other~|~7A589B7918D2D0AA1FB52860FE2BC8AFC1F61C0E 101436~|~1~|~1~|~01/S<2~|~Preventive Maintenance: MicrosurfacingMED-3-0.00 to 3.80WAY-3-26.13 to 28.35WAY-57-1.25 to 2.20 WAY-57-4.82 to 5.00~|~05 - 4R Maintenance - Resurfacing~|~18D655029D3B2E396C20ECCFDBE0D674D15532B1 101436~|~1~|~2~|~02/STR~|~Preventive Maintenance: MicrosurfacingWAY-57-0.00 to 1.25WAY-57-5.00 to 10.66~|~05 - 4R Maintenance - Resurfacing~|~057C2268188F1FE78B12D4A5FF31554CE8B60C4E 101436~|~1~|~5~|~05/S>2~|~Preventive Maintenance: Microsurfacing WAY-57-10.66 to 10.82 Akron urbanized Area.~|~05 - 4R Maintenance - Resurfacing~|~68622721A4930056CE5B7333F2C0801F267F6AAF 101436~|~1~|~4~|~04/STR~|~Bridge Work STP Rural:WAY SR 0057 - 01.060 SFN 8502587WAY SR 0057 - 08.470 SFN 8502676~|~13 - Bridge Rehabilitation~|~3DFD4B5E8F3FAA56A6C34EF6DDAA7D00980FC05C 101436~|~1~|~3~|~03/S<2~|~Bridge work for STP < 200000:MED SR 0003 - 02.200 SFN 5200024MED SR 0003 - 02.370 SFN 5200067~|~13 - Bridge Rehabilitation~|~AD7AEC5B99934A6FCEBB8AC450991B5903D69559 116708~|~1~|~1~|~01/S>2/CANF~|~Resurfacing, urban paving in the City of Canfield.~|~05 - 4R Maintenance - Resurfacing~|~F8F92F964ACAFEB57AEDB194C414B54042B4C071 116708~|~1~|~3~|~03/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~78D713FF6F60E738DB8D372B70325E01FAF2239A 116708~|~1~|~4~|~04/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~59523DFD4174B2EB77AE8D0BA3847CF4781F1D96 116708~|~1~|~5~|~05/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D69F6F91B5929D7C2EEC8DAFC3B834675EBC26B2 116708~|~1~|~6~|~06/NHS~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~D4DB55B0DC0A2E9CBCEAFF67A06ED07F2A345D05 116708~|~1~|~7~|~07/STR~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~292CEAEAF9AFCF3C86C5BD794F97ECAEBC2BCF53 116708~|~1~|~2~|~02/S>2/CANF~|~Full and partial depth pavement repairs and curb ramps.~|~04 - Reconstruction - No Added Capacity~|~A48B9901E3375EBF002AB82B7806CEED1050596E 115546~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~5AAA42AFFB03EBC7E7C4FFD37EC4DF3E4574D47F 126189~|~1~|~1~|~01/STR~|~Rural~|~05 - 4R Maintenance - Resurfacing~|~9813886B44B8695CFD649804A2974D8220A9C247 102819~|~1~|~1~|~01/NHS~|~NHS Pavement~|~05 - 4R Maintenance - Resurfacing~|~58EF747293345A449C9F0D45B327E6415473AE13 93774~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay with repair treatment on VIN 50 4.91-9.19. Work includes asphalt overlay treatment on VIN 50 9.19-10.68. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~BBB2B7655ADEBB5665CAAABC1890DA788020F787 119557~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funded scope~|~21 - Safety~|~C769A3F9101651A03EB10A5CDAF3D2500C6FCDDD 120997~|~1~|~1~|~01/S>2~|~Resurfacing on the large urban portion~|~05 - 4R Maintenance - Resurfacing~|~94BF7CC3012741BD76A39CE8E3DC1318FCB6B129 120997~|~1~|~2~|~02/STR~|~Resurfacing on the Rural portion~|~05 - 4R Maintenance - Resurfacing~|~65F11D72DEDA534D7DC9A646A95177EE4DF4D0A5 109312~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 60 8.60-8.88. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~204F4BEB531EB7B62F2492AB4A8E737A2D30335C 98561~|~1~|~1~|~01/IMS~|~test~|~~|~B50281FA15633D2C8684CDDA9E5010E350782C04 77049~|~1~|~1~|~01/NHS~|~Reconstruction from High level bridge to North Akron (SLM 2.13 to 4.30)~|~~|~2FA53361F0D9B191B902EDED08F56F5CA25452DC 83695~|~1~|~1~|~01/SAE~|~100% federal signal work at 5 intersections and post-construction signal optimization in City of Marion~|~21 - Safety~|~3F6D5B8FCD6A40E1F02BF59AE427D8AC2730A050 83695~|~1~|~2~|~02/S<2~|~80% federal & 20% local funding for curb ramp work at signals in City of Marion~|~21 - Safety~|~E083224A396094FA11C89CC3ACDCB768800E6917 113658~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 81 1.50-1.53 Work includes retaining structure installation for appx 145 ft, including roadway repair and guardrail installation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7CD409CD3C096C851F94291AA3320EBD9DCE38B9 112370~|~1~|~1~|~01/BRO~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~47 - Bridge Preventive Maintenance~|~195F101A9FB91A1617017D7894E3105A7453FE70 109928~|~1~|~1~|~01/STR~|~Resurfacing on SR 613 in Hancock County from the Findlay Urban Area Boundary at TR 229 at 14.33 to the end of the project at SR 18 at 18.65. District Preservation funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~0903A6A230ED7087680D831135220957E22CDE2B 109928~|~1~|~2~|~02/S<2~|~Resurfacing on SR 613 in Hancock County from the end of the concrete pavement at 13.08 to the Findlay Urban Area Boundary at TR 229 at 14.33. District Preservation funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~3A664C007B2B4EE1391F2A6FD26E292B4FC4DBEA 77238~|~1~|~1~|~01/IMS~|~Widening of IR 70 from Palmer Road to SR 158~|~03 - Reconstruction - Added Capacity~|~B0E77F00046D64C45C59FAA4351D43FD52AD7AAB 121248~|~1~|~3~|~03/STR~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~3F4BDECB274ABFA9453C3C051FF4F4D32C1A391E 121248~|~1~|~1~|~01/S>2~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~88A4477B7DC61CEBC6795245AC64057A9733B7D5 121248~|~1~|~2~|~02/S5K~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~75E3A796369B4E0220A6D5804248A2E498745BAA 124901~|~1~|~1~|~01/CMQ~|~CMAQ MPO funds~|~28 - Facilities for Pedestrians & Bicycles~|~371FF2AE3696B2CC52D31EA05C65219812E28E0B 99797~|~1~|~1~|~01/STR~|~Replacing the linked culverts.~|~04 - Reconstruction - No Added Capacity~|~5B050EDAD6A6AC27D5ABD1BA9FA48875A3755105 103959~|~1~|~1~|~01/NHS~|~Reconstruct ramp~|~04 - Reconstruction - No Added Capacity~|~FD787AC786F676C3F39EF0841FD5DDC30A0B620B 103959~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~8C3525521EC7E730235935D919563362FA9810EA 117531~|~1~|~1~|~01/NFP~|~CIPP Liners~|~~|~9FA9C2D3A45E777D3CCAC81CC4E66A7360F43212 117531~|~1~|~2~|~02/NHS~|~CIPP Liners.~|~04 - Reconstruction - No Added Capacity~|~03F9B4E777DD92D60C33C6790B3ACEC5A6355162 117531~|~1~|~3~|~03/NHS~|~CIPP Liners~|~17 - Construction Engineering~|~1915468E58C41D4B3F5ACF4EA2C118C13C44B292 124408~|~1~|~1~|~01/NHS~|~OH Share~|~13 - Bridge Rehabilitation~|~710DDFB52CCA4350AE2EF15FF4E66B54CB4820DC 124408~|~2~|~2~|~02/NHS~|~WV Share~|~~|~C7F3D2D0E0A32D1454B10522EB5F8FF1C01AF76F 110078~|~1~|~1~|~01/NHS~|~Consultant construction engineering~|~17 - Construction Engineering~|~932C121BEC1388E87606A0203E11489483031EF0 88978~|~1~|~1~|~01/NHS~|~BRO SR125 0.00 - 6.42 resurfacing projectOn SR125, beginning at the Clermont/Brown County line (SLM 0.00) heading east for (SLM) 6.42 miles, it is proposed to resurface the existing asphalt roadway.Pave thru brdg:0802263 BRO SR125 1.31 Intersect: Trib Of Cloverlick Creek80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~93552517EBD64E3A596F657871418B6FAA8C43BB 88978~|~1~|~2~|~02/STR~|~Overlay on BRO 125 20.50 (SFN 0802506)~|~13 - Bridge Rehabilitation~|~34259E692D4E5D2EE7EA66DD2BE45B3F5C2D3A5E 115529~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County CEAO LBR Funding - 4B87 (100% Federal) - Replacement of SFN 6037240 carrying Darlington Drive over Johnathan Creek~|~10 - Bridge Replacement~|~B83E2136BD4067C0AAC88DB606757199A58ED322 121036~|~1~|~1~|~01/STR~|~Spot paving various locations~|~05 - 4R Maintenance - Resurfacing~|~B09814ECBDFD34BDAE2AC683AEFDB128E7B0FE16 102979~|~1~|~1~|~01/STR~|~Microsurfacing on rural route: CLA SR 41 SLM 4.99 to 6.04 & 11.02 to 12.05.~|~05 - 4R Maintenance - Resurfacing~|~D56F0FFF6D9EE56AD62DCD5FC06F2834056A7507 91861~|~1~|~1~|~01/STR~|~Resurfacing and pavement repair on a portion of US 127 in Preble County from I-70 to the Darke County line~|~05 - 4R Maintenance - Resurfacing~|~3C5CF9F3FFDCF6966DE0AF7A936B06F6B9E51DD6 106876~|~1~|~1~|~01/STR~|~MED 252 & MED 3~|~05 - 4R Maintenance - Resurfacing~|~54DB2A5CF908C7FF26C37979B73F1CEA289E5D2A 106876~|~1~|~3~|~03/SAF~|~Add a turn lane at MED-3-19.63~|~21 - Safety~|~6E9742BB93FB292BFBF162815BAA91EC54736530 106876~|~1~|~2~|~02/S>2~|~MED-3-13.54 to 14.95~|~05 - 4R Maintenance - Resurfacing~|~CA8E38840676CADE7A26A0CB9C6D63DAD47799DC 111246~|~1~|~1~|~01/NFP~|~01/NFP/PV/ -Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~68B4CD25DD328723E5057F1C400E20F476BF777C 96632~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. ATH 33 15.60 L (SFN 0505900), ATH 33 15.67 R (SFN 0506044), ATH 33 15.67 L (SFN 0506028). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~D874E7208808D1347911F1428D6294139D599EDA 96632~|~1~|~2~|~02/BRO~|~Concrete bridge deck overlay. ATH 33 15.60 R (SFN 0505927). Bridge on system eligible funded 80 federal/20 state.~|~17 - Construction Engineering~|~E65C8B3C1A8221E4576742C0B1461A0AE99A9EBD 110271~|~1~|~1~|~01/IMS~|~Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue due to a landslide. The slide has currently has damaged the guardrail and culvert in the slide limits. Work will require embankment repair and installation of drainage measures to control roadway drainage.~|~04 - Reconstruction - No Added Capacity~|~8F2998F3399BA2C5E941991F5110B4896FDEF0F0 121509~|~1~|~1~|~01/SAF~|~TSG & Lighting Maintenance~|~21 - Safety~|~74DB7485101C656456E26DBCE6F6BC578DBFD598 125678~|~1~|~1~|~01/S>2~|~Plan split for large urban section of SR 132. ~|~05 - 4R Maintenance - Resurfacing~|~BBCA1966D511CE61C0D1D633265CC32561378C8D 125678~|~1~|~2~|~02/STR~|~Plan split for Rural sections of SR-132. ~|~05 - 4R Maintenance - Resurfacing~|~87CA2F0B9802AA0C34A3B0B5EB4593CDF3B35A0C 112822~|~1~|~1~|~01/STR~|~Resurfacing SR 39 from SLM 7.19 to SLM 13.08~|~05 - 4R Maintenance - Resurfacing~|~FFECE394144EDEBC59A4C3879FAC61023C15474F 112822~|~1~|~2~|~02/S<2~|~Resurfacing SR 39 from SLM 13.08 to SLM 13.48~|~05 - 4R Maintenance - Resurfacing~|~53F1DA27350D68B42D69B7AD5AD2E8D1D76CBEE0 112822~|~1~|~3~|~03/NHS~|~Resurfacing SR 39 from SLM 13.48 to SLM 13.57~|~~|~B0571060E8E6D816CA4E292C674486B6B5E7F6C7 111414~|~1~|~1~|~01/SAF~|~Safety funded plans split~|~21 - Safety~|~68452F58E132948168B1398D625A805743D4ED36 106991~|~1~|~1~|~01/STR~|~GSMP Slide repair.~|~~|~F71AE73169C73BB5F4116934B042FF519138AB19 127170~|~1~|~1~|~01/S5K~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc. ATH 13/550~|~21 - Safety~|~D591E25F1CB7B91468C45FD6AE546CF1BE09DD66 87728~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~9C36A5CEDFCEB4FD4C30CA173D2790CCF3FAD8C4 87728~|~1~|~2~|~02/SAF~|~Replacement of a Type A end anchor with a Type E end anchorHFST at RIC-RA-70066 (High Friction Surface Treatment RIC-RA-70066 (I-71 SB to US-30 WB)~|~05 - 4R Maintenance - Resurfacing~|~2E6099C773EED0016EE5671A4DF80D802A3A4CD2 87728~|~1~|~3~|~03/NHS~|~Structure Repairs on:RIC-314-5.05 (Patching Concrete Structure)RIC-30-5.50 (Patching Concrete Structure)RIC-30-6.20 (Patching Concrete Structure)RIC-30-8.79 (Patching Concrete Structure)~|~13 - Bridge Rehabilitation~|~CDD5623EC62ACAAF8D3375E2A3DFD5655D849FEC 97209~|~1~|~1~|~01/STR~|~Cost to cover all culvert, roadway, and traffic control costs to replace Culvert CLE-131-0656.~|~04 - Reconstruction - No Added Capacity~|~125E7D1EDBC7FAB8657A74B479EA58B6CD3145D7 109558~|~1~|~1~|~01/NFP~|~Construct salt yard along SR 41~|~44 - Other~|~5CEB7EF905D3466EFA9F8A5D91D0B049B4ABD622 126387~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~728016E8017DAF141EB046D4617E8F589F82339E 88228~|~1~|~1~|~01/MPO~|~Construct multi-use trails and make the necessary improvements along Garnsey Street from the Great Miami River Recreational Trail to mote Park and commercial Street from Garnsey Street to Piqua activity Trail to designate the bike route and enhance the pedestrian pathways. Street improvements include modest curb, sidewalk, drainage and pavement base repairs, new surface asphalt, signage, PM's and tree plantings.~|~28 - Facilities for Pedestrians & Bicycles~|~726F04B2FE88FE97619E1F979DF4DB57F30813B3 100873~|~1~|~2~|~02/NHS~|~Culvert replacement project for FY2021. GAL 35 4.820 (CFN 1820882), GAL 35 13.370 (CFN 1819533), and WAS 50 2.269 (CFN 1885941). NHS route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~84C3603F18AD38BC318D4163EDC778661F092606 100873~|~1~|~1~|~01/STR~|~Culvert replacement project for FY2021. HOC 278 8.020 (CFN 1811280). Rural other federal aid.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9B567A355410AC08AD686D05CE4CCED5DFF83E61 88254~|~1~|~1~|~01/IMS~|~LUC IR475 9.3-9.9~|~01 - New Construction~|~BB8FF125860EFB180016AE19ECE8CFB8A152B46B 88254~|~1~|~2~|~02/NHS~|~LUC US23 9.63-10.4~|~01 - New Construction~|~E12FB8CE4A496BE175E42CD608150251672AE282 115359~|~1~|~1~|~01/MPO~|~Resurfacing.~|~~|~245FF7E78F77A98E51DAA3C719D5C3483C61F38A 108367~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 32.15, DSR MEG-002. Rural other federal aid funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1DCB20A33B2262BC539AF3D27F60878C9F048A1A 123231~|~1~|~1~|~01/BRO~|~Bridge repair.~|~47 - Bridge Preventive Maintenance~|~57002085FBCF4A8D67C926A40AD5E0D5700291C2 103120~|~1~|~1~|~01/SAF~|~Installation of Mast Arms at MED SR 0003 14.95 and Fenn Road.~|~21 - Safety~|~E380567F28399ADA6DD898B338600CFF4B4BFA36 121280~|~1~|~1~|~01/NHS~|~Plan Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~BBBC215103154EE4F07D9D3FE7C469DDBBEAA2F8 95495~|~1~|~1~|~01/NFP~|~Plan split for 100% state funded culvert work using the District Preservation Program SAC 4PS7.~|~44 - Other~|~3FEE1D9BCB567FAFBA3BB3B8AF1F5D2C9438E117 106114~|~1~|~1~|~01/NHS~|~DSR JEF-002~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FC01285810D6590E3EDA8547FB2E82FF6729967D 104501~|~1~|~1~|~01/IMS~|~Concrete pavement repair on IR.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~243F49BEE7CB73C1671BCA2763FC58B10F040897 109693~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7~|~05 - 4R Maintenance - Resurfacing~|~E185396D5A26784B1BAD6801CD2B802398C1F85F 97082~|~1~|~1~|~01/NFP~|~Roadway Split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F759386911B4C60C3435DF04CB0FBED965C10D7 127016~|~1~|~1~|~01/SAF~|~Add PHBs~|~21 - Safety~|~27FEB1F3601720EFA48BD8BB17E24DB52F1C0583 92988~|~1~|~4~|~04/STR~|~"04/STR/BR/ " - Disrtict Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on 1) Mus-345-0020 and 2) Per-345-0649~|~13 - Bridge Rehabilitation~|~1C37902F202DFEF1F31559F7CDDBD1A0736A35B2 92988~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Mus-SR 345-00.01.60; 2) Per-SR 345-00.00-09.22;~|~05 - 4R Maintenance - Resurfacing~|~87EE23CBDA400D84295BAEB85D66F8F46B54C413 92988~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Per-SR 383-00.00 to 01.50~|~05 - 4R Maintenance - Resurfacing~|~A9BE6DEDE287016C7236F8795C6B1625DE9E0294 92988~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-SR 345-01.60-02.52~|~05 - 4R Maintenance - Resurfacing~|~AE6FD8F94667884BC08BEF2E0264CA3ACC1F7ED7 116505~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E923056A3DDC3FDADA8F245FA2553E01B3C604CB 87630~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Fast Dry Striping within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BEB554B66170FE5E0D1CB774F10FF3C47D37C8E5 114151~|~1~|~1~|~01/SAF~|~Construct pedestrian facilities along SR224~|~28 - Facilities for Pedestrians & Bicycles~|~3338F458E11D538C54867AB0B125C4F9D12A7EE5 126403~|~1~|~1~|~01/S5K~|~Plan split for the items that are Urban Paving eligible; 80/20 split between ODOT and the City.~|~05 - 4R Maintenance - Resurfacing~|~4E54FDBEA470332A57507FA5C7B7794357953A8C 126403~|~1~|~2~|~02/S5K~|~Plan Split for the 100% City funded items.~|~05 - 4R Maintenance - Resurfacing~|~338B15A515FB98A6CB907719F11EB595E2CCC0FD 97444~|~1~|~1~|~01/SAF~|~Installation of roundabout at CR 6 (Friendsville Road) and CR 86 (Smithville-Western Road) in Wayne County.~|~21 - Safety~|~12A96B2C93867E9AD13438B39B11CA33409336B5 126958~|~1~|~1~|~01/SAF~|~Plan split for all work associated with roundabout~|~21 - Safety~|~B6EF26C0C5FC933EEC4467C9F247B5B152F49112 76451~|~2~|~5~|~05/BRO~|~"05/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004112 GUE SR209 9.84 Intersect: Over Wills Creek; BR Eligible for Rehabilitation: Length=172 SD/FO(1) SR=94.1 DSR=4~|~13 - Bridge Rehabilitation~|~2CB15456BD53A464480FDF9D826BF7628101533B 76451~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Gue-SR 209-11.53 to 12.85; 2) Gue-SR 209-14.44 to 14.65; 3) Gue-SR 209-14.65 to 15.07;~|~05 - 4R Maintenance - Resurfacing~|~453DC65305934A97979AE3D948FC29FE46CDCB15 76451~|~2~|~6~|~06/NHS~|~"06/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3004058 GUE SR209 8.56 Intersect: Over Wills Creek & CSX RR; Not BR Eligible for Rehabilitation: Length=484 SD/FO(0) SR=60.8 DSR=5~|~13 - Bridge Rehabilitation~|~7110EA2137B20B36CA58C800F6389A59EE0C16D2 76451~|~1~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Resurfacing on Gue-SR 821-05.45to 05.94;~|~05 - 4R Maintenance - Resurfacing~|~9241335B478DA09F03D85B07B6F158FE3202E724 76451~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Urban NHS resurfacing on 1) Gue-SR 209-10.71 to 10.76; 2) Gue-SR 209-10.99 to 11.00; 3) Gue-SR 209-11.03 to 11.23; 4) Gue-SR 209-11.32 to 11.53; 5) Gue-SR 209-12.85 to 14.44;~|~05 - 4R Maintenance - Resurfacing~|~B8525B1630EA3B9FD2B1A1CDE1539516A5A8F315 76451~|~1~|~1~|~01/NHS/CAMB~|~"01/NHS/PV/CAMB" - District Preservation 4PF7(Federal 80%) / 4BG7(Local 20%) - No CAP - Urban Paving in the City of Cambridge on 1) Gue-SR 209-08.73 to 10.71; 2) Gue-SR 209-10.76 to 10.99; 3) Gue-SR 209-11.00 to 11.03; 4) Gue-SR 209-11.23 to 11.32;~|~05 - 4R Maintenance - Resurfacing~|~C2D87D699F4721AB89DE8BAF69AFD166607D15E2 125857~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 327 2.13 SFN 8202133~|~10 - Bridge Replacement~|~271D4A696506C1210FD920D769C8E7AF1FAD169F 101383~|~1~|~1~|~01/NFP~|~Tree removal/pruning for District 8.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~112A93CE9016CF2E7AA06B6ECEE219A4A4D4E088 101383~|~1~|~2~|~02/SAF~|~Pruning/tree removal at the District's top ranked curves based on 10-year crash history.~|~21 - Safety~|~D4F2E1B421CE5706BC40EAB7CE77DB9415DDC637 96584~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~01 - New Construction~|~CD513E4A01CFCFD878F5A4119E5291C3A62B10B9 116657~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay With Repairs including bridge maintenance: RIC-71-10.76to 20.636~|~05 - 4R Maintenance - Resurfacing~|~C5C0EC097A7A62283E181EECAD1FDDE6EB15BE68 116657~|~1~|~2~|~02/SAF~|~Corrective milling/surface treatment on I-71 NB near on-ramps from US-30 and upgrading cable median barrier for entire project limits.~|~21 - Safety~|~AFC6138973504679E4EBCC2D47EA950228FE82E4 83440~|~1~|~2~|~02/STR~|~Bridge Maintenance/Repair - ASD-430-0003~|~13 - Bridge Rehabilitation~|~4BF1602B214CFC9C03768AA059299E9E3271C498 83440~|~1~|~1~|~01/NHS~|~Bridge Maintenance/Repair - RIC-030-1915 L&R~|~13 - Bridge Rehabilitation~|~AC97147E75CDE02E35B6910C0D026CF9F1D6763A 83440~|~1~|~3~|~03/BRO~|~Bridge Repars - ASD-039-08.97 BR Funds~|~13 - Bridge Rehabilitation~|~EAD681726C3D099B38074AC4658E391187CBDA24 110386~|~1~|~1~|~01/NHS~|~TLCI work~|~28 - Facilities for Pedestrians & Bicycles~|~CE3B4C12B9488B87990FDF53C821C6453B7C01D1 114211~|~1~|~1~|~01/SAF~|~Friction Improvement on FRA-70 and Ramp from US23SB to SR315SB.~|~21 - Safety~|~95CA3D985A15888B316FBFBCA939A772F712DECD 114211~|~1~|~2~|~02/IMS~|~All work associated with the FRA-70 inlet repair, conduit replacement & slope repair falls in this plan split.~|~04 - Reconstruction - No Added Capacity~|~E99C17FECCB5EF4DE35A824EF40C916B06E334BA 126995~|~1~|~1~|~01/SAF~|~Mini roundabout on University Dr @ Cox Ln~|~21 - Safety~|~7D4C52C766C99B1424EDA31A825CE1DE6559F3C4 97510~|~1~|~1~|~01/NFP~|~Adding Split 1~|~44 - Other~|~E43136F7A7E254855AA61C444F83BC064AE856C1 116932~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FDCE11191663A19606800CFCA05527DCBA843F3B 109794~|~1~|~1~|~01/SAF~|~Plans split for CEAO HSIP funds~|~21 - Safety~|~ED119A39058DA692294D52FDA15AE2A9159C52DB 102930~|~1~|~1~|~01/IMS~|~Interstate funding eligible.~|~13 - Bridge Rehabilitation~|~EDFEA7EC7B084F8EFB8FC1108C7208A2E4EF4928 105708~|~1~|~1~|~01/SAF~|~plan split~|~44 - Other~|~47F8C48432F9CB50E4925B659145A9C7865C266A 115356~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4EC5E729D3CE5D79CAF0D41B06C80974B0112699 115446~|~1~|~1~|~01/NHS~|~Lighting upgrade at ROS 23/35 & 23/159~|~21 - Safety~|~951D3F443F8AB33774CCBC814D57957E5B763065 113932~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~5F8F198D22519EC26E32571EBE47BC3F7D3195FB 113932~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~106DC28C225D39D14D9797EE091BB830AE3522DA 101517~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. HOC 56 0.00-4.41 and HOC 180 14.43-16.32. Federal Aid route, 80% Federal/20% State funds.~|~05 - 4R Maintenance - Resurfacing~|~9E06A1371AFAE27DBA12990CECB947DF304449F6 124813~|~1~|~1~|~01/NFA~|~Repair bridge carrying SR 520 over Black Creek by encasing pier piling. In Stream Work Required.~|~47 - Bridge Preventive Maintenance~|~C4140FC875EBEB7283C3EA9C3461CD7677B973EB 105494~|~1~|~1~|~01/IMS~|~Interstate plan split~|~05 - 4R Maintenance - Resurfacing~|~F52A7262EFCA47FB4530C655C9642A0FC3D43768 105494~|~1~|~2~|~02/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~1C48D972D17739BEF49E53381A2DF67FF971099C 105494~|~1~|~4~|~04/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~6A8CE311795250FF3A0E3EEDC3E6065993EE9E15 105494~|~1~|~3~|~03/S<2~|~Urban Area < 200000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0FA75960D819AA471B78DEA829B2A9374272CB90 87382~|~1~|~1~|~01/NFA~|~Complete bridge replacement with minimal approach work on SFN 1904299 DAR 722 0554 on State Route 722 over a branch of Twin Creek, 0.74 miles West of US 127 in Castine.~|~10 - Bridge Replacement~|~3CA2ED4E27536CF5E82D9E535B91AE13839307E6 87382~|~1~|~2~|~02/STR~|~Repair deck edges, patch abutments using anodes and encasing piers on SFN 1904264 DAR 721 0543.~|~13 - Bridge Rehabilitation~|~6341115575081A2D14E849ECD2F8B205F4F95172 114274~|~1~|~1~|~01/IMS~|~Mowing contract in District 8~|~44 - Other~|~ECD40C4A62C2545D92C0DF3B037D52ABC559514D 91719~|~1~|~1~|~01/IMS~|~Rehabilitate bridges HAM-71-1989L/R and WAR-71-0009 L/R installing new rigid overlays and replacing the roadway barrier between the northbound bridges, and perfroming other minor bridge rehabilitation items.HAM 71 1989L; SFN: 3107752 and intersects: Fields Ertel RdHAM 71 1989R; SFN: 3107760 and intersects: Fields Ertel RdWAR 71 0009L; SFN: 8301697 and intersects: Mason-Montgomery RdWAR 71 0009R; SFN: 8301727 and intersects: Mason-Montgomery Rd~|~~|~92308B21E92505D671AD7B1342C0E23228D63A3E 103116~|~1~|~1~|~01/NFA~|~The county will construct a new 300' turn lane off of N. Main Street to safely allow truck deliveries in and out of Whirlpool which is expanding its Findlay facility.~|~01 - New Construction~|~59DFBF0D2507E8A3B6F3089293382C7A8881A1F4 110046~|~1~|~1~|~01/NHS~|~NHS portion of resurfacing on CLE-125~|~05 - 4R Maintenance - Resurfacing~|~5A6BBAF40F2DF13A6559B15D7847D564554D8383 101043~|~1~|~1~|~01/STR~|~MAH SR 165 from 5.46 to 16.64MAH SR 170 from 0.00 to 0.78MAH SR 534 from 13.78 to 16.31~|~05 - 4R Maintenance - Resurfacing~|~33EAE558B754C277E12AF499DBB4D33895986D34 101043~|~1~|~2~|~02/S>2~|~MAH SR 46 from 10.83 to 12.04MAH SR 625 from 0.22 to 2.59~|~05 - 4R Maintenance - Resurfacing~|~D8779DD3A9D7449F149DBE39FE4336E6F3FAB5DC 78883~|~2~|~2~|~02/S<2~|~Erosion/slide repair of State Route 531, at SLM 2.40.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B79D6071C14509897037B34FB0F81485CA17B0CA 78883~|~1~|~1~|~01/S<2~|~Erosions/slide repair of State Route 531, between SLM 2.90 through SLM 3.58.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EF2959AC915C9580CDD3B1B1A8675A67C551EE3D 92000~|~1~|~3~|~03/S<2~|~HIG SR124 Resurfacing ProjectUrban Area portion: HIG 124 (10.70-10.84/10.84-11.02) & HIG 247 (11.91 - 11.96)80% Federal /20% StateCO CC PV Urban PV is to cover the state portion within the urban area.~|~05 - 4R Maintenance - Resurfacing~|~B0E3D83D945DFDEEF0A591A81265B9F8F2B50D81 92000~|~1~|~1~|~01/STR~|~HIG SR124 Resurfacing projectRural portion: 11.02 - 17.82Pave Thru Brdg:3602052 HIG SR124 17.33 Intersect: Smith Branch80/20 split~|~05 - 4R Maintenance - Resurfacing~|~21D3071C934BA3C84C9DF6E37290668B4CADA6F7 92000~|~1~|~2~|~02/STR~|~HIG SR124 Brdgs f/Rehab3601986 HIG SR124 14.59 Intersect: Ervins Branch3601935 HIG SR124 13.58 Intersect: Wolf Run80/20 split~|~13 - Bridge Rehabilitation~|~B10923401856E7A6F3E638DF1BC2614079242BD3 92000~|~1~|~4~|~04/S<2~|~HIG 124 (8.78-9.44/ 10.36-10.70/ 10.84-10.86) HIG 247 (11.74-11.91/ 11.96-12.37) Federal/Local Match 80/20~|~05 - 4R Maintenance - Resurfacing~|~494AB998378FBDC004561E13F8826759A358A7FD 115660~|~1~|~1~|~01/BRO~|~Replace Bridge~|~10 - Bridge Replacement~|~98D132AE6B6AF29BBB0DEBB55C78232C7C25F4F6 91760~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 555 0.00-3.27. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~EB9E0DE08EBCAF8B830CA81765F53BEE292A4F6F 96652~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. NOB 761 0.00-1.90 Not on any federal aid system funded 100 % state.~|~05 - 4R Maintenance - Resurfacing~|~8BF5D872D4BEF155E46E720212FD48F605837A71 96652~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GUE 313 20.99-21.01 and NOB 313 0.00-6.17. Rural other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~EAADA64908C5850098FCEAE2C3C9E7165B1544D8 102562~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. MOE 78 0.00-8.15, 15.05-23.50. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~84612E22C86C99532807DBF4DE20EA90FFACFFB2 123453~|~1~|~1~|~01/STR~|~Resurfacing SR 150~|~05 - 4R Maintenance - Resurfacing~|~F4B7C9D4C7D9C653329511E81CB02AD5DFCC5002 82978~|~1~|~1~|~01/IMS~|~District Wide Crack Sealing project on the Priority System for FY2017. Routes to be determined. (approx 100 lane miles)~|~~|~33888B25618F21038FF82970CAE1168553A93E8A 125718~|~1~|~1~|~01/IMS~|~Various bridges throughout district 6~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4AA24170CC5BCC65F4D649143509F4D1C11BFCCE 102148~|~1~|~1~|~01/STR~|~Bridge replacement LAW SR 217 6.85 (SFN 4403002)~|~10 - Bridge Replacement~|~D1121EFE7D2F75AE05EF81CEB2082C7660B13E66 109787~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~17 - Construction Engineering~|~451246B6B110F1EBA5486053FC7212826BB74235 98281~|~1~|~1~|~01/NHS~|~SFN 7710828 SUM-SR 8-6.44 Bridge Hit repair to include beam heat straightening and cross frame replacement~|~13 - Bridge Rehabilitation~|~DBDE8589882B88BF43CE82AD2A66EA1857A967AA 118900~|~1~|~1~|~01/STR~|~Resurfacing SR 514~|~05 - 4R Maintenance - Resurfacing~|~DE8C0CE72D606D32F49CDA8B0032587314240717 107813~|~1~|~1~|~01/STR~|~All work is in this split. Funding is 100% state funds from the district preservation program using SAC 4PS7.~|~44 - Other~|~EC6BF961154F1B53A617A1820E86870F117FEF11 108151~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-33D-1.28-2.12~|~05 - 4R Maintenance - Resurfacing~|~8CAAB6D2D334C764290881A6FB9AA43088CF6381 99578~|~1~|~1~|~01/BRO~|~Bridge repair project that includes a deck replacement. ATH 56 10.57, SFN 0502642. BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~F5B39BBBCDDEDC2283B22B23AF1B6F9254FD86DE 89348~|~1~|~1~|~01/ENH~|~This split is for work eligible for funding from the state Transportation Enhancement Program. The January 2011 approval letter which stated "ODOTT will provide 80% of the eligible costs, up to a revised maximum of $520,000 in Federal funds through the Transportation Enhancement Program for the Main Street (S.R. 634) Lighting Enhancement Project" also stated ODOT had "revised the funding Award for the subject project at the villages's request to remove proposed sidewalk rehabilitation items from the scope of services."~|~31 - Landscaping & Other Scenic Beautification~|~9C577652E6828B15CD38C314C894D46433D16199 95246~|~1~|~1~|~01/MPO~|~Widen SR 301 (Center Street)from 2 to 3 lanes, Forest Street to north LaGrange Village Limits.~|~04 - Reconstruction - No Added Capacity~|~0AF7F149A607AB164D7720FD65E16469ACE32C71 95657~|~1~|~1~|~01/NFA~|~Fuel Tank Removal at Berkshire Outpost~|~44 - Other~|~1BC229657206D841F651291660A6A6472056AF94 95657~|~1~|~2~|~02/NFA~|~Fuel tank removal at Jeffersonville Outpost~|~44 - Other~|~71202B48BF365B133712F9B1D07E82FF4BD3D8AD 102058~|~1~|~1~|~01/STR~|~Slide Repair.$1,000,000 project cap for GSM funds for priority 1.Remaining funds will be District Allocation for priority 2.~|~44 - Other~|~D5D08FC8A395FAD6D957A9F81C4F458C7FF94CA4 98531~|~1~|~2~|~02/NHS~|~100% state funding for culvert work.~|~44 - Other~|~07CCD6CF180A93FF7286A75938F1722C4330AE06 98531~|~1~|~1~|~01/NHS~|~Split for 100% local items~|~44 - Other~|~8891829D94FE84703B986BF2908BD0322BD4BCB0 95949~|~1~|~1~|~01/NFA~|~STW American Idle TSE~|~44 - Other~|~6E4865CDAA6C9860D7278ADF802A40B43F372073 94361~|~1~|~1~|~01/NHS~|~On US35, 6.32 miles east of the Ross County line, it is proposed to regrade an existing rock slope by blasting.80/20 split01/NHS/OT/State~|~99 - State Preventative Maintenance~|~EB4BA54FE6DDF2EB9F820950860A71286C43FE3E 97771~|~1~|~1~|~01/BRF~|~Bridge replacement project. MEG 12029 0.01 (SFN 5342120). OBPP funding.~|~10 - Bridge Replacement~|~612EB72B5EDF340AAB63529F60A69AD80FE104B4 97771~|~1~|~2~|~02/BRF~|~Bridge replacement project. MEG 2262 0.25 (SFN 5332168). OBPP funding.~|~10 - Bridge Replacement~|~8C69D14C165630010623BBDACF0E11A41C2E9DCE 87350~|~1~|~1~|~01/NHS~|~Priority System minor rehab. of JEF-22~|~05 - 4R Maintenance - Resurfacing~|~36B90A560818CE4DFCFED65F541CABBC1A9EF353 87350~|~1~|~2~|~02/NHS~|~Bridge deck and approach slab patching.~|~05 - 4R Maintenance - Resurfacing~|~0D7CB3B4EF427B99E24C1F26AFFDF3DEC2E19933 102738~|~1~|~1~|~01/S>2~|~Bridge Replacement: MED-3-12.00 (SFN 5200199)~|~10 - Bridge Replacement~|~03E237BB27FF395C14FA1A3FA0EF23435BF9AA69 87113~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. MEG 124 36.88-42.02. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~030A2079C6223BBB7104EA13BBD1E6798EB47CFC 87113~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~C724C7A3226A1D0B58EEFF3F05145FDC044ADE5C 116211~|~1~|~1~|~01/BRO~|~Superstructure replacement utilizing 4R87 Federal Funds at 95% ($1,481,225 maximum).~|~13 - Bridge Rehabilitation~|~0CF4A702BF868EE1139FFE677231898ACEC7C7A8 87329~|~1~|~1~|~01/STR~|~7302525 SCI SR73 10.43 Intersect: StreamIn Henley on SR73, 0.07 mile south east of the Norforlk & Southern Railroad tracks, it is proposed to replace the deficient structure.~|~10 - Bridge Replacement~|~1474D6A019AC1ABF668E08FF244F22D68A364BF9 112786~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~~|~3B4E0E73A96E09EDCFC20B12863000BA7792ECC6 112786~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 10' to 20' span.~|~~|~113472ED82E942C60BC89D4EE8014CBB04AED7BC 112786~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~E3F57FA1E0114BB98EAB850072C53919B91A39F5 114384~|~1~|~1~|~01/STR~|~Established Plan SPlit 01/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~A632A1474F3470474E6DFEC6FA2CF2136DB3DB8E 112836~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~EE303656A6C2A6169D82406D64B7B0DD44D6655B 112836~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~D65870BE0982D7959EFF4D1C640FE8E993AD77F2 124443~|~1~|~1~|~01/NHS~|~added plan split.~|~13 - Bridge Rehabilitation~|~33D3C9C8A20C297ABE31C70C9E4DADB2CD0C4A2B 97580~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing of US 40 (SLM 9.75 to 10.78) and SR 48 (SLM 21.45 to 22.13 and SLM 23.16 to 24.11) within the City of Englewood.~|~05 - 4R Maintenance - Resurfacing~|~7F159B7AFB55BB3B86CC46899838C60442F082F8 97580~|~1~|~2~|~02/NHS~|~Pavement planing and resurfacing of SR 48 (SLM 24.37 to 25.12) within the City of Union~|~05 - 4R Maintenance - Resurfacing~|~E088484D3B7D148D680C6761A26175550C5C4A1E 97580~|~1~|~3~|~03/NHS~|~Pavement planing and resurfacing of SR 48 (SLM 24.11 to 24.37) within the City of Clayton.~|~05 - 4R Maintenance - Resurfacing~|~DEA287A91DD5A03EB83C61904FA9543D7146769C 114981~|~1~|~1~|~01/NFP~|~Crack Sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4DBBCB52673D69B82E494041E4AC2C30263FED36 116718~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4607D8FA22D9EA347FA89E4263C98F76DD042ECE 115906~|~1~|~1~|~01/SAF/BARB~|~Extend Holmes Ave from 3rd St to Wunderlich Ave in the City of Barberton~|~~|~AFE5FF980AE3CC854ACA20AAB184C7C792C04BE5 95269~|~1~|~1~|~01/SAF/SCI~|~It is proposed to install/repair guardrail on various county routes in Scioto County.100% HSIP~|~21 - Safety~|~455B09C502CCE57CFD615FE61107AB5E782B6AB9 127100~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~9EEFD010E2B6A1DADE65D8ED068C807A7E6B7F3F 105230~|~1~|~1~|~01/NHS~|~AC overlay without repairs on NHS routes: LOG US 33 SLM 0.00 to 2.01.~|~05 - 4R Maintenance - Resurfacing~|~30FA9E08D05E1B06057D8933D0F0D507D54379DC 112998~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~10 - Bridge Replacement~|~39ADF630ECF5F40C9D267A5617B9C684F0015549 104267~|~1~|~1~|~01/SAE~|~Upgrading guardrail and end terminals and adding new guardrail on various county routes throughout Trumbull County.~|~21 - Safety~|~0B459C20F09EC658C1051C1C431C5E0AB704B395 21781~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for this project using federal BR funds. SFN 1807730~|~13 - Bridge Rehabilitation~|~F2D1AB4AF22DAFAE674B9DE82A2ABAEE7E9F9C19 96328~|~1~|~1~|~01/STR~|~ADA SR 136 0.00-4.34~|~05 - 4R Maintenance - Resurfacing~|~BEB2D032980A9F5A88966D128180D71C0E33B6F7 96328~|~1~|~2~|~02/NHS~|~BRO US 52 21.05-23.73~|~05 - 4R Maintenance - Resurfacing~|~4C3CC12D0182FB373A4963EAA7FF8E7BFBB32092 96366~|~1~|~1~|~01/STR~|~Rebuild left deck edge (approx. 3' wide). Rebuild left forward wingwall encase all pier columns. Seal entire structure with concrete sealer AUG-66-1819. Rebuild deck edges (both sides) AUG-197-1208. Structure patch both (l&r) T-joints over pier. Suggest using a self consolidating concrete (SCC). CHP-29-1241. Reface abutments with s=anodes haunching out at the top to cover deck spalls along abutments, encase pier columns, patch/rebuild wingwalls with anodes, correct erosion at wings and seal longitundinal joint on wearing surface - SFN 0601268 AUG 66-1981.~|~13 - Bridge Rehabilitation~|~A762A4C5C96781D80F17E58928F508AF9D8E854F 96366~|~1~|~2~|~02/NHS~|~Rebuild deck edges, rebuild abutment corners, encase pier columns LOG-33-0888.~|~13 - Bridge Rehabilitation~|~C51858C64ABAA5DF336A44418421A4A09388B97D 102459~|~1~|~1~|~01/IMS~|~Double Micro resurfacing of BEL-70~|~05 - 4R Maintenance - Resurfacing~|~C23DE1D0CC51762EDF5716A2E83B5C98E23170F4 80748~|~1~|~5~|~05/S>2/Dub~|~Enhancements and non eligible items to be paid 100% by Dublin~|~13 - Bridge Rehabilitation~|~DC57BC851442404BA3B57C6CD118373C76BCBA84 80748~|~1~|~6~|~06/S>2/AEP~|~Utility items to be paid 100% by AEP (thru Dublin)~|~43 - Utilities~|~74007F8FC097B132E7D4F309CC96271405B33099 80748~|~1~|~7~|~07/S>2/Spec~|~Utility items to be paid 100% by Spectrum (thru Dublin)~|~43 - Utilities~|~7096CEEBF422F97444415E30F9DDA3C1B502A788 80748~|~1~|~8~|~08/S>2/Dlnk~|~Utility items to be paid 100% by Dublink (thru Dublin)~|~43 - Utilities~|~E7A5AC7F0BFC6632074C64DD23DD505AE2CB36FD 80748~|~1~|~1~|~01/NHS~|~Pavement work on US 33 (including ramps)~|~04 - Reconstruction - No Added Capacity~|~259CE837AA857D2B9FD0892AD69CF03F102277A0 80748~|~1~|~2~|~02/S>2~|~Pavement work on SR 161, Post Rd, Hyland Croy Rd and Post Preserve Blvd.~|~04 - Reconstruction - No Added Capacity~|~024ED6EF611ABA3862B828AD310EF0E87D9B7475 80748~|~1~|~3~|~03/NHS~|~Bridge replacement (UNI-33-2489 L/R)~|~10 - Bridge Replacement~|~883E42E46086D5DA35F5406FAE297D59E8BA3584 80748~|~1~|~4~|~04/S>2~|~Bridge (culvert) rehabilitation (UNI-33-24.50 and FRA-33-0014)~|~04 - Reconstruction - No Added Capacity~|~79D8CC07175B081DF5AA098A521CC333C623B836 80748~|~1~|~9~|~09/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~40475C76D2BC9CFB83AE1725346460ABCC42107C 93134~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3002705 GUE IR77 7.08 Intersect: I-77 Under Cr 35; BR Eligible for Rehabilitation: Length=280 SD/FO(1) SR=77.5 DSR=4~|~13 - Bridge Rehabilitation~|~62D8B6233BF01B67FED8B2F37A7B3BB4704108AA 93134~|~1~|~2~|~02/IMS~|~?02/IMS/CV? ? District Preservation Program 4PF 7 (90% Federal) / 4PS7 (10% State) ? No Cap ? Inserting culvert liner on GUE-IR 77-7.08R~|~44 - Other~|~FAF63821B8D726AF2174D746A58FC5B712A94523 84652~|~1~|~3~|~03/BRO~|~SFN 5007054 MAH-IR 680-5.85 Ridge Avenue over I-680~|~~|~B1BF5D51D9299C3B5262A8CBA52C40B551D4A719 84652~|~1~|~2~|~02/IMS~|~See linked structures >20' span.~|~~|~BDE93EEBBC48DC5168A49C57738E84611159AE09 84652~|~1~|~1~|~01/S>2~|~IR680 4.12-6.97~|~~|~C34C04682965783FA3A19A344BEFECB04DA043E3 124448~|~1~|~1~|~01/SAF~|~Install High Vis Markings and RRFB's~|~21 - Safety~|~A080A94E30495969FB9B84358497F2D39F2D4B65 87268~|~1~|~1~|~01/IMS~|~Funding split for all costs associated with Structure HAM-71-0134 for ventilation/mechanical/structural upgrades including necessary park impack improvements.~|~13 - Bridge Rehabilitation~|~A7BA35692F98F177702E403D4404D8BFA1F48C8A 87268~|~1~|~2~|~02/IMS~|~Plan split to repair deck on HAM-71-0159.~|~04 - Reconstruction - No Added Capacity~|~AA3B9B2166760E5A93686459ED43D73AA844B20E 110176~|~1~|~1~|~01/IMS~|~Approximately 200 feet of the up-slope, along the right shoulder of the WB I-275 entrance ramp from Loveland-Madeira Rd., experienced over-saturated overburden soil and migrated down the slope, filling the ditch and pushing trees into the shoulder.~|~04 - Reconstruction - No Added Capacity~|~2B401D1FDAF303A1E09F32BBAFFED30A14BFBA9B 115542~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~~|~2207D23B7CA118DA2C2D327998E98A17850151F7 99537~|~1~|~1~|~01/NHS~|~Resurfacing work funded at 80/20 fed/state~|~05 - 4R Maintenance - Resurfacing~|~8B01AF65E63EA846BB84018C19D214D82CBB0F03 94437~|~1~|~1~|~01/STR~|~Bridge - Major Rehabilitation~|~13 - Bridge Rehabilitation~|~6D0235DF611BEC4655E24D6156C92BBDC4F61A7E 111601~|~1~|~1~|~01/NHS~|~Maintain structure JEF-7-12.93 by cleaning steel pier caps and installing animal guards.~|~47 - Bridge Preventive Maintenance~|~0BB87E239F217300CABBC39BCF68C36FCC59FF30 124158~|~1~|~1~|~01/STR~|~Proposed County Garage~|~~|~951596F66E8CF7197A6ED054ACED15F83B260262 92334~|~1~|~1~|~01/ENH/ZANE~|~"01'ENH/OT/ZANE" City of Zanesville Enhancement project - Installation of sidewalk and decorative lighiting from Shinnick Street from 6th to 4th / 4th Street from Shinnick to Market Street - Enhancement Project Cap of $750,000~|~31 - Landscaping & Other Scenic Beautification~|~16614CF479E445186CC288E84B79A2FE9B52CF00 113982~|~1~|~2~|~02/NHS~|~Plan Split to resurface the ramps at the CLE-32 + CLE-133 interchange~|~05 - 4R Maintenance - Resurfacing~|~1EBECF14BAACF3DB1B1A74F5E1B9AD8B9158A6A8 113982~|~1~|~1~|~01/STR~|~Edge replacement on: CLE 133 SLM 22.25 to 31.16~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD9B905B107A045FCE0DE20D1375A2DD7DD460C1 113982~|~1~|~3~|~03/S>2~|~Plan split for Urban Portion of CLE-133: SLM 22.0-22.25~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D938B571E50E6FB2DB4F202A6834073BC4A55132 76802~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~AAD93C7FE0C5CE6C0C23579C40AADBD1E9552AD9 118117~|~1~|~1~|~01/NHS~|~added plan split.~|~21 - Safety~|~3A3FDFFA362D75A0855B5C02FBADB6BBBDACBEF9 123893~|~1~|~1~|~01/S>2~|~Construct a separated two-way cycle track by reducing roadway to three lanes~|~28 - Facilities for Pedestrians & Bicycles~|~FFE66CFBBAE13D9448369C46A2D5374BC18CE1F5 103791~|~1~|~1~|~01/SAF~|~Reconstruct traffic signals - City of Springfield.~|~21 - Safety~|~59D56D6B78F5F6A5980622DAFB0135491D953300 102732~|~1~|~3~|~03/NHS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~710E641BBCA1F1A1DEA2D09E0B20995207201393 102732~|~1~|~1~|~01/NHS/RAVE~|~Resurfacing, urban paving in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~B481AC424E9B0DDC34245FE183747FD35D245A74 102732~|~1~|~2~|~02/NHS/RAVE~|~100% Ravenna Items, full and partial depth repairs, ADA curb ramps and reconstruction of catch basins.~|~05 - 4R Maintenance - Resurfacing~|~0CA0E04B08C355A57AC4B5EC89264A81F5FAF962 111203~|~1~|~1~|~01/MPO~|~MPO funded plan split~|~05 - 4R Maintenance - Resurfacing~|~8D34B187DDFDAEFFAF5FB00DB477E2BF7C66E8FA 111203~|~1~|~2~|~02/NFA~|~Non-federal & non-OPWC work being completed on project~|~05 - 4R Maintenance - Resurfacing~|~EC38F717FE381C395D9E484C6C29D77D28954588 120929~|~1~|~1~|~01/NFP~|~Mowing.~|~44 - Other~|~C803070679BF8308E856DDE5BCAE0991E591A2F0 118758~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~A66174F32B9C97F05D7176A34E08F5C8D8504C75 99637~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~751C825F5674C21E7D2B173284E80D22D2FABB69 118989~|~1~|~1~|~01/SAF/STCE~|~Construct roundabout.~|~21 - Safety~|~51BF17F8204F40E8C2FA020AFC7B0B21044AAD32 90208~|~1~|~1~|~01/ENH~|~Sidewalk installation on Fairground Boulevard and Hood Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~A6137EB50458C61AC9F0DC79B6E83A70791FF305 124855~|~1~|~1~|~01/S>2~|~Traffic signal upgrades along SR 256 corridor~|~21 - Safety~|~21A8BD3C5C2BC85DA4E88AEDBC31EDE28D28A937 94931~|~1~|~1~|~01/SAF~|~Safety/local & MORPC/local funding for Schrock/Cleveland intersection turn lanes~|~21 - Safety~|~4BB55A0E0E8DE9FB0EED0FA2D7FD12E37ADDA0A8 94931~|~1~|~2~|~02/SAF~|~Safety/local & MORPC funding for Schrock/Cleveland intersection turn lane~|~21 - Safety~|~8E7181F54911DA695F752ACD9EC24ABDC14E3CC1 101755~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS~|~05 - 4R Maintenance - Resurfacing~|~85D0189B3C3FEE60825C816529CEFDA4061E0DCB 99927~|~1~|~1~|~01/IMS~|~1. Remove LMC overlay and replace with SDC concrete using hyro-demolition. 2. Replace expansion joint seals. 3. Replace splice bolt (span 2, beam 4). 4. Investigate epoxy injection for abutment vertical cracks. 5. Patch backwalls with item 519. 6. Seal concrete surfaces with epoxy-urethane.~|~13 - Bridge Rehabilitation~|~42EE9C4E340B97F70486528D129A18F4DE4F6890 110409~|~1~|~1~|~01/SAE~|~Safety Program - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - Intersection upgrade of SR 158 and Pleasantville Road~|~21 - Safety~|~85E0B42B50EB66225E58EBDF1ADB1D2071838442 110409~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~F703645E2BCC24F4DBCB2CD241BB68A1075DD299 116819~|~1~|~1~|~01/STR~|~Bridge replacement.~|~04 - Reconstruction - No Added Capacity~|~1FA76AC1100530599E28830F6832206710E91BDF 103176~|~1~|~1~|~01/S>2~|~Extend the Wolf Creek Bikepath in the City of Dayton~|~28 - Facilities for Pedestrians & Bicycles~|~EF8ED50075998B137F9E8DB98EA4AE5A633E5125 121667~|~1~|~1~|~01/IMS~|~Repair rear abutment.~|~17 - Construction Engineering~|~10D669C9EE126C30B2B869831B98B60E2A655381 121667~|~1~|~2~|~02/IMS~|~Bridges on 71 and 270 abutment and backwall repairs~|~13 - Bridge Rehabilitation~|~4A43C2E4F21B949AE1B80BBEF31B369799D7F51F 121667~|~2~|~3~|~03/NHS~|~UNI-US33 abutment repair~|~13 - Bridge Rehabilitation~|~61AD2A31A97136FFE5EE27DDFF823DAE870D03AB 121667~|~3~|~4~|~04/BRO~|~MAR-SR309 abutment repair~|~13 - Bridge Rehabilitation~|~A09259436F9B39FF61043DBEC316B098BE1E38DD 110310~|~1~|~1~|~01/STR~|~ResurfacingHIG 72 0.00-6.71~|~05 - 4R Maintenance - Resurfacing~|~B8B3F409C97EA8E4EFF0F22E6D33573B319A93F1 110310~|~1~|~2~|~02/STR~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~01D23E09CF029A951106C5DA65E803EC00C044D7 106373~|~1~|~1~|~01/IMS~|~Field pave IR culvert.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~07E6A24064ABCBD34E2881A13EE7DBBFFE2083F7 106373~|~1~|~2~|~02/STR~|~Remove and replace rural route culvert.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~12BC3C33008D4BABD03C332EB30399F4A67B2F7B 97022~|~1~|~1~|~01/ENH~|~SRTS Butler--installation of sidewalk on Morgan and Wilson.~|~28 - Facilities for Pedestrians & Bicycles~|~98C3E01DDDE484AA68FD7EE3026FBD37F747D70E 113816~|~1~|~1~|~01/STR~|~Replace structurally deficient bridge with minimal approach work.~|~10 - Bridge Replacement~|~DC68B93E8917817A371D900ECC0DBE73E0D921B7 117880~|~1~|~1~|~01/NFP~|~Split for tree removal work~|~99 - State Preventative Maintenance~|~4C35207885B5C32C2C1462EAC24FBA41253994FF 117093~|~1~|~1~|~01/SAF~|~Pavement marking and signage for bike routes.~|~21 - Safety~|~D921FD225880A8C017FC4EA291FE1D273F1DD780 117093~|~1~|~2~|~02/NFP~|~Pavement marking and signage for Bike routes on municipal routes in the City of Portsmouth.~|~17 - Construction Engineering~|~B5BAD6D56E2737FD1AF5422E554AD9CF149F3E82 99915~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for guardrail upgrades~|~21 - Safety~|~E9F160FA8F7A4497BCA9C4F668C9B292914427D6 117681~|~1~|~1~|~01/STR~|~Replace superstructure.~|~13 - Bridge Rehabilitation~|~E566942E4335413C64C7D9483C25797A645405A1 90127~|~1~|~1~|~01/BRO~|~8702136 WOO SR51 0.4 Intersect: Crane Creek 8702012 WOO SR51 3.02 Intersect: Dry Creek~|~10 - Bridge Replacement~|~2B7D780DFFCABA3D6110A3646C7EF6E894C9C33B 90127~|~1~|~2~|~02/S>2~|~8702101 WOO SR51 1.78 Intersect: Ayers Creek 8702071 WOO SR51 2.16 Intersect: Little Cedar Creek~|~10 - Bridge Replacement~|~F7404F99DE07CF5DAE98EB9F5078EA09DD04BD53 95100~|~1~|~1~|~01/ENH/Warr~|~Construction of new gateway signs throughout the City of Warren, Trumbull County, Ohio.~|~31 - Landscaping & Other Scenic Beautification~|~C061946E89C0AFAB2371AD5A719A6669472C92A4 109376~|~1~|~1~|~01/NFP~|~Culvert and resurfacing project in Tranquility WLA.~|~04 - Reconstruction - No Added Capacity~|~84C3B69221A66718D3219BCC896F3616A7486974 98836~|~1~|~1~|~01/IMS~|~Split for sign structure repair~|~44 - Other~|~9BCC04907E6A779635154866239C556FAE1249CD 100893~|~1~|~1~|~01/STR~|~SCI 140 7.65 (SFN 7304293)~|~10 - Bridge Replacement~|~67CCBB6F03BB8A59D1DCCB2E28276135985AF4F2 87664~|~1~|~1~|~01/SAF~|~Constructing roundabout at Summit and Powder Mill Roads~|~21 - Safety~|~5723273A8DF4902CABC04A3E769B0F767A4C5DA7 111446~|~1~|~1~|~01/NFP~|~Miscellaneous charges not attributable to a specific PID~|~17 - Construction Engineering~|~D98BBE3FFEC2408A8A22454280AC5A1BAF466673 102950~|~1~|~1~|~01/MPO~|~Resurfacing project on WAS CR 60 5.00-6.33. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~7460EF6FB066579CCBB8EA41C235E1157EDC667A 100059~|~1~|~1~|~01/STR~|~Slide Repair~|~44 - Other~|~F9187745FD67EFA135CB04DD9D4F3FF588F2A1BF 90192~|~1~|~1~|~01/IMS~|~Lighting maintenance~|~44 - Other~|~0032FC88D109C5F0286B0850FC11775029CDC944 87208~|~1~|~1~|~01/NFP~|~This project is a SPEDuP project and must use 100% state funds. All work in this project is in this Plan Split. This includes work on SR 15 which is a Rural Major Collector and the work on SR 634 south of SR 613 which is a Rural Minor Collector. Federal funds cannot be used to resurface Rural Minor Collectors. State funds from the District Preservation Program. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~5D63A8EC51DB474511E5DE885AA8064B7917CE16 91773~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. NOB 147 3.50-21.04. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~AF20A469C2A045BACFBBCCB2BDF81E569DBA06E0 91773~|~1~|~2~|~02/STR~|~Landslide repair on NOB 147 5.12 and 5.32.~|~17 - Construction Engineering~|~F5FA19EFFF526E062C3F5A33CC2333EEFDB1F9B0 80192~|~1~|~1~|~01/IMS~|~New interchange at IR-680 at SR-164 in Mahoning County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~43DFE9F4109114A7D5079982672F1CBA2E4412E7 80192~|~2~|~2~|~02/SAF~|~Along State Route 164 add a SB auxillary lane South of the interchange to just South of the State Route 626 intersection; addition of a southbound LTL on State Route 164 at the State Route 626 south junction; conversion of the State Route 626 North junction to a multilane roundabout; Beaver Township, Mahoning County, Ohio.~|~07 - 4R Maintenance - Relocation~|~69EB0F98C8110302A6DADA8A6138F6A12489A1E1 80192~|~2~|~3~|~03/IMS~|~Widening and replacement of SR-164 structure (SFN#5029783) over the Ohio Turnpike, Beaver Township, Mahoning County, Ohio.~|~10 - Bridge Replacement~|~8766DCA156DF50C300746D48D1FDF96BF866E668 80192~|~1~|~6~|~06/IMS~|~Plan Split for Ongoing Engineering services.~|~17 - Construction Engineering~|~F6F24235EFCAE86D3D8680A944C5FBCE02B004D7 80192~|~2~|~4~|~04/IMS~|~State Route 164 pavement from SLM 5.19 to SLM 5.27 that ties into 250 feet of Ramp DH.~|~07 - 4R Maintenance - Relocation~|~2D915646706A4E94B828E3B98B9BBD7D93F1E5F9 80192~|~3~|~5~|~05/MPO~|~Construction of park n ride along State Route 164.~|~44 - Other~|~D8B42C95DB69A3326FA58005B5CEB4B0829E2ABD 85394~|~1~|~2~|~02/NHS~|~Plan split for work in the Village of Hunting Valley~|~05 - 4R Maintenance - Resurfacing~|~B87460EE205183A9F2C74F19EBEE0FB97DF233AC 85394~|~1~|~1~|~01/NHS~|~Split for work in Pepper Pike~|~05 - 4R Maintenance - Resurfacing~|~8359CBD1BBA4D82A1E4B7726C7965D4A9BCEE139 85394~|~1~|~3~|~03/NFP~|~features/work requested by the LPA at 100% percent local participation~|~44 - Other~|~399A1452B3AF7044588FF3AB34C154D1DFF89C45 119056~|~1~|~1~|~01/S>2~|~Plan split for project to Paint bridge CLE-275-1008 which carries Old SR 74 over I-275. Project will include other miscellaneous repairs. ~|~13 - Bridge Rehabilitation~|~8B24C874D794BAD63C238704931595C7F9FE99EB 124445~|~1~|~1~|~01/NHS~|~added plan split.~|~13 - Bridge Rehabilitation~|~02D62BBBEFC05325E67A5BE210A017BFB4A857F6 105588~|~1~|~1~|~01/IMS~|~IR 70 existing pavement reconstruction from railroad bridge to Front St. (50%), resurfacing and restriping IR 70 from Front St to Grant Ave, Ramp D7, and local streets (Mound, Short, Civic Center, Second)~|~17 - Construction Engineering~|~ECBCC130AFF2F7F9FC3CCC1B9E500CFDD9CD20F9 105588~|~1~|~2~|~02/NHS~|~IR 70 widened pavement from railroad to Front St. (50%) and retaining walls~|~~|~AB35F262E789FA73E09AF8B19D1F692367FF5D76 105588~|~1~|~3~|~03/IMS~|~Bridge replacement - existing width - FRA-71-1503L (I71 SB over railroads, Scioto River, and SR 315 (50%)~|~~|~A8F2F55A78E07A502D836844E5482F83C8BE481E 105588~|~1~|~4~|~04/NHS~|~Bridge replacement - widening - FRA-71-1503L (50%)~|~~|~E98E68E49E1767A72A9A8DC8CC7A50945D77CEF3 105588~|~1~|~5~|~05/NHS~|~New bridge - FRA-70-13.73B (Ramp D7 over Short St)~|~~|~075FF6A2F05C69F2565E4C9BAFBF1EB3B5B2EDCD 105588~|~1~|~6~|~06/NHS~|~Eligible utility items (waterworks, sanitary, electric, etc)~|~~|~E5B2B54B34854E85A49DEE17E459A6E9F41361C4 105588~|~1~|~7~|~07/NHS/MPO~|~MORPC/Columbus funded enhancements~|~~|~7FBA8F9124F2436E89655A4212EFAE224035765E 105588~|~1~|~8~|~08/NHS/Cols~|~100% City of Columbus items~|~~|~2100B4890584E4F347C711E485C7E3AFC6B34F7B 105588~|~1~|~9~|~09/NHS/Inc~|~Incremental items - Columbus to pay costs above standard items~|~~|~04EE0EFF5CF687ED0A623FBEC75B54A3BA72B870 102711~|~1~|~1~|~01/NHS~|~Bridge Replacement: MED-18-3.29 (SFN 5200571)~|~10 - Bridge Replacement~|~CAD204076B509ECDCD546535FFCB117F246431AF 103403~|~1~|~1~|~01/S<2~|~Landslide repair. NOB 78 8.38. Work length approximately 250 ft. DSR NOB-008.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1D2320B98253545BBD73EE7C80CB6EBFD6B6868D 98700~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Maintenance 4CP7 (100% State) - No CAP - Priority System mowing in D-05 for CY 2016 and CY 2017: Location 1) Fai IR 70; Location 2) Lic IR 70; Location 3) Mus IR 70; Location 4) Gue IR 70; Location 5) Gue IR 77;~|~44 - Other~|~80B29612B70558799D6FAA51230531568A54D897 112403~|~1~|~1~|~01/IMS~|~Rehabilitate FRA 70 Pump Stations ST-1 and ST-1A~|~04 - Reconstruction - No Added Capacity~|~8E05B99DFA028276B6B83BE4574AEE4911E7EAFB 103995~|~1~|~1~|~01/ENH~|~Crosswalk enhancements.~|~21 - Safety~|~C823A4A88AB557F9E3B688E21F5C1FAB3DB4DF57 90213~|~1~|~1~|~01/MPO~|~high st/west main st SR5 18.27-20.11~|~05 - 4R Maintenance - Resurfacing~|~CE8E6CFD8062FA0E917A01033A1294259DF90BC5 102377~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2022 herbicidal spraying. Funded 100% state.~|~44 - Other~|~2F4129A28BCB984EAC67DA7090226A68CA76ECDB 116460~|~1~|~1~|~01/SAF/GREE~|~Adding cross walk to S Main St.~|~28 - Facilities for Pedestrians & Bicycles~|~F9F8A8A730FC3932F0C026125C5C92A2956C6B8D 125832~|~1~|~1~|~01/ERD~|~Sancus Road SUP from Worthington Galena Rd to Worthington Galena Blvd.~|~28 - Facilities for Pedestrians & Bicycles~|~B143EFC368E6EE65F0DE97591CF59359A081D6CD 107891~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 81 2.07-2.09. DSR MOE-014. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2242E2D1988BF0E925015534DB5BB023AF281460 99997~|~1~|~1~|~01/IMS~|~Split for work on the interstate system.~|~47 - Bridge Preventive Maintenance~|~3A1C54871E3AD336449CBB9DE74624C6554C9741 99997~|~1~|~2~|~02/NHS~|~Split for work on the NHS~|~47 - Bridge Preventive Maintenance~|~C5175CC3C6830B92DF4C97BBB6420840317FA4A6 109586~|~1~|~1~|~01/NHS~|~Bridge Split~|~04 - Reconstruction - No Added Capacity~|~E34AAD4D41E7F249645706C213284F21F2FB8C2C 97957~|~1~|~1~|~01/IMS~|~SFN 8706182 Redeck~|~13 - Bridge Rehabilitation~|~DB759CF7388E78F3A70314B3D3C9DEF770E93517 82314~|~1~|~1~|~01/CMQ~|~Construct a multi-use trail connecting the existing multi-use trail segments in Springfield from Fair Street to Johnny Lytle Avenue and from John Street to Leffel Lane in Springfield.~|~28 - Facilities for Pedestrians & Bicycles~|~C36BB1811A0793A515AAB8DF9F8A60D431D1BA86 103316~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. GAL 35 12.76 L&R (SFN 2701014 L) and (SFN 2701030 R) and GAL 35 13.42 L&R (SFN 2701065 L) and (SFN 2701073 R).~|~13 - Bridge Rehabilitation~|~5646BAEE84D0AC56E1FA2DD45F99AF170A04E33C 121675~|~1~|~1~|~01/NHS~|~Resurfacing NHS~|~05 - 4R Maintenance - Resurfacing~|~5CF027BF7E89EEAEF6A0BA71CBE9F8B13E4A17DC 106253~|~1~|~1~|~01/NHS~|~Safety~|~21 - Safety~|~41716091A9B8322BB708C88C69440FF3493D01B2 119769~|~1~|~1~|~01/STR~|~added plan split.~|~10 - Bridge Replacement~|~785F144B8FC323F8D730E26502E4997C7B6A46A8 121177~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F29305A3388DFAC8ABFB65D87650C3DE047DB5BA 121177~|~1~|~2~|~02/NHS/Cols~|~City of Columbus Urban Paving Plan Split~|~05 - 4R Maintenance - Resurfacing~|~A9A0BDA7B3791FCA4D1BF1B786999E1AAD7163C2 121177~|~1~|~3~|~03/NHS/Cols~|~Items of work to be paid 100% by the City of Columbus.~|~05 - 4R Maintenance - Resurfacing~|~074DB450D49BD175E9B65D86EA64607F94270FC6 109698~|~1~|~1~|~01/STR~|~Herbicidal Spraying~|~44 - Other~|~48E8C51CB8A3A49E6F0DBEE87FE0CBEBE8CCDFFD 93259~|~1~|~1~|~01/BRO~|~District Preservation 4PS7(100% State) - No CAP - Rehabilitation on 4200934 KNO SR13 22.39 Intersect: Markley Run; BR Eligible for Rehabilitation: Length=54 SD/FO(1) SR=66.6 DSR=7~|~13 - Bridge Rehabilitation~|~B27B30DE6194F6D91A7A521FA1F365FC2B4E238C 126133~|~1~|~1~|~01/NHS~|~Pavement repairs on HAM-126~|~05 - 4R Maintenance - Resurfacing~|~41A5A84A6183AF0B2FE48A7878FE4C6B356CF2B0 85181~|~1~|~1~|~01/MPO~|~Construct a two way left turn lane, install storm sewer, sidewalks, and other roadway improvements on SR 235 from Galewood Drive (5.08 SLM) to 0.85 Miles north of Galewood Drive (6.16 SLM) in New Carlisle.~|~21 - Safety~|~2DF4146F09898CC310E074A97013095D44BD7C73 85181~|~1~|~3~|~03/STR~|~Resurfacing on SR 235 from SLM 5.89 to 6.16.~|~05 - 4R Maintenance - Resurfacing~|~5F7DF50E322F3E79AE00DED86F23E15AF695A48E 85181~|~1~|~2~|~02/S<2~|~Urban resurfacing on SR 235 in Clark County from SLM 5.08 to 5.77 in New Carlisle.~|~05 - 4R Maintenance - Resurfacing~|~6441B12DFD3F98E5B8A21BE934D6443EA3235D8B 119116~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay on GAL 325 0.00-7.26 and GAL 588 0.00-0.76.~|~05 - 4R Maintenance - Resurfacing~|~3D8272B99FC74774AA5D8D4FB74EAB5EF9F1BB1F 119116~|~1~|~2~|~02/SAF~|~Installation of a turn lane on GAL SR 325. Safety funded 90% Federal/10% State.~|~21 - Safety~|~78ECDAFB91C0C60CB9731F6FD9B5575AD2B79CE2 119116~|~1~|~3~|~03/SAF~|~Install a rectangular rapid flashing beacon at SR 325 and Cherry Ridge Road.~|~21 - Safety~|~27A649AD302191FCC59853B6C14AE855B6EC95D5 110556~|~1~|~1~|~01/STR~|~BRO-68-44.12 SFN 0802042~|~10 - Bridge Replacement~|~2F96AD559C35DD4A30C66C6AFC8B21195867BEA0 96279~|~1~|~1~|~01/NFA~|~Full Service Maintenance Facility~|~~|~2B5B8C643D3300C566575441A1501FEFE43CBF02 105033~|~1~|~1~|~01/S<2~|~80/20; MPO/local~|~04 - Reconstruction - No Added Capacity~|~8BCFE2515A4E10B0A7B69AE082CD2F4935BB8816 105033~|~1~|~2~|~02/NFA~|~100% Local Items, e.g. waterline~|~04 - Reconstruction - No Added Capacity~|~E22F67989347AA8AD90C7E6491947EA22B8DA91B 101842~|~1~|~1~|~01/S<2~|~Project to install Rock Channel Protection at bridge WAR-123-2877 to repair the scour that has occurred and protect the bridge from further stream meander.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C09CA525D557D033F564C5EDE63028B3CC1649DF 102316~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various Darke County Roads~|~21 - Safety~|~FB5704E732B1D2150C0D70106515D3B6A8685934 91152~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2014 herbicidal spraying. 100% State.~|~44 - Other~|~C2C704A86001DDAA7C8D72D6CF9F7FA06FE52D0E 101096~|~1~|~1~|~01/IMS~|~6 bridges.~|~13 - Bridge Rehabilitation~|~F8930855FB69B7279A81496FC522751AE24CCD89 101096~|~1~|~2~|~02/NHS~|~Linked bridges~|~13 - Bridge Rehabilitation~|~EE2CE446DABC5CAEBA64B8DCF779D0A26BFE0B8B 101096~|~1~|~3~|~03/STR~|~Other functionally classified bridges~|~13 - Bridge Rehabilitation~|~FD5EC16AE33DCAA8D77914B09ACE331E1D66482B 98653~|~1~|~1~|~01/STR~|~WIL SR49~|~~|~F20C66A550AE08CF78CF38685AC6BB2536CE77EE 98653~|~1~|~2~|~02/STR~|~WIL-SR49~|~~|~5977A27CF0589883ACC2BA1F30A0A8E5D9C3A769 99019~|~1~|~1~|~01/SAF~|~District wide polyester pavement marking~|~21 - Safety~|~CD3AE96098374FA16FF3D9B868B0718FE7F08B4B 76266~|~1~|~1~|~01/SAF~|~Safety project thru the unincorporated community of Berlin to improve congestion and mitigate crashes on this section of US 62.~|~21 - Safety~|~6E0ABE27B75760B244D79386E1E44C4FA66ED6A0 76266~|~1~|~2~|~02/ERD~|~This funding split is to be used for the difference in pay items for the aesthetics/deocorative pay items as part of the construction project.~|~44 - Other~|~E9F514D7F9BE487E1FC2FBAC221A9567565814AD 106294~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties.~|~21 - Safety~|~AE9517F7780570DEF20BB0E9407F9C2DE98FB7A6 103918~|~1~|~1~|~01/STR~|~Temporary repair of the slip on PIK CR 50 1.95 DSR# PIK-001~|~04 - Reconstruction - No Added Capacity~|~1ADFBFB1B010988B1DE97B21983BFA1542967563 115720~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation to MUS-555-4.41 (SFN 6006000) and MUS-555-5.16 (SFN 6006094).~|~13 - Bridge Rehabilitation~|~9295CCE460FE20EA6507D53F1341938E51083863 106116~|~1~|~1~|~01/NFP~|~Guardrail~|~21 - Safety~|~758DB936CE57A63D7A949E5DDBFEE0B096B5AE05 91814~|~1~|~1~|~01/NFA~|~To perform pavement repairs, asphalt concrete, and/or aggregate resurfacing in the following ODNR wildlife areas: 1.) Pickerel Creek in Sandusky Co. 2.) Little Portage in Ottawa Co. 3.) Willow Point Wildlife in Sandusky/Erie Co. 4.) Resthaven Wildlife Area in Sandusky/Erie Co.~|~44 - Other~|~C7AC9C24407EB8DC9D961A332D89B46BA111EBCD 89431~|~1~|~1~|~01/STR~|~District Pavement Marking project. 100% State Funds~|~44 - Other~|~91DAA29ABAC5EA362A3FC9DDCA7CBFFF11BE886A 114686~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs:ASD-60-11.743 to 15.739ASD-302-5.370 to 8.838; 10.969 to 11.224ASD-511-15.281 to 17.992~|~05 - 4R Maintenance - Resurfacing~|~03DDF44841B79715770DCEF596B38D987037C017 114686~|~1~|~3~|~03/S5K~|~Asphalt Concrete Overlay with Repairs:ASD-60-15.739 to 16.381ASD-511-14.530 to 15.281~|~05 - 4R Maintenance - Resurfacing~|~61B9AB0946209AC9B71319327BB7FE527A69C5AC 114686~|~1~|~2~|~02/IMS~|~Bridge maintenance work on ASD-60-15.79 (SFN 0302228)~|~13 - Bridge Rehabilitation~|~8E1B7F9ACEF2088BDFA34825DD1765515F9B8643 114686~|~1~|~4~|~04/SAF~|~RRFB installation on ASD-250 in Savannah.~|~05 - 4R Maintenance - Resurfacing~|~16FB486C88001E3A06D3C253D2D5EAFA6724553D 101919~|~1~|~1~|~01/IMS~|~Work to texture the pavement to improve surface friction and safety.~|~21 - Safety~|~9792C07914C7626AB743B07B0D5805645F130569 97651~|~1~|~1~|~01/NFA~|~Chip Sealing HAS-258 from 0.00 to 3.02 and TUS-258 from 19.45 to 20.90 including new pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~5EDEBFAA390E4B89DA91CC987DB9E21C0D1B6BE6 97651~|~1~|~2~|~02/STR~|~Chip Sealing TUS-258 from 20.90 to 21.23 and HAS-331 from 0.00 to 3.05 including new pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~FCFDE14BF5D929E733937CF54D7E6FE20D26DA39 107700~|~1~|~1~|~01/STR~|~Resurfacing on US 127 outside the Van Wert urban area using district preservation funds (80% 4PF7 and 20% 4PS7). Work is from the Mercer County line at SLM 0.00 to the Van Wert Urban Area limits at TR 91 Dustman Road at SLM 7.03.~|~17 - Construction Engineering~|~61D4773153AF08B9436EA62B20FB7302399A3848 107700~|~1~|~2~|~02/S<2~|~Resurfacing on US 127 inside the Van Wert Urban Area but outside of the City of Van Wert. Work is on both sides of the road from the Van Wert Urban Area limits at TR 91 Dustman Road at SLM 7.03 to where US 127 enters the City of Van Wert on the right side at 7.33, then on the left side of US 127 until US 127 leaves the City of Van Wert on the right side at SLM 7.53, then on both sides of the road until it re-enters the City at SLM 7.79, then on the left side until SLM 8.00. Federal and state funds from the District preservation program budget. No local funds.~|~17 - Construction Engineering~|~BFBD1C63CF2C3591CA92E4E1DDD135D66F68F1C4 107700~|~1~|~4~|~04/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds.~|~17 - Construction Engineering~|~9FCCF24D33755504B74497D6C517D61B194A1766 107700~|~1~|~3~|~03/S<2/VAN~|~Resurfacing on US 127 inside of the City of Van Wert. Work is on the right side of the road from where US 127 enters the City of Van Wert at 7.33 until US 127 leaves the City at 7.53, on the right side from where US 127 re-enters the City at 7.79 and then on both side starting at 8.00 until the end of the project at Hospital Drive at SLM 8.54. Federal funds from the District Preservation Program budget with the 20% match provided by the City of Van Wert.~|~17 - Construction Engineering~|~C336E4FBEFF55AC3DE9B32EDE4C4B3DA0002FBFC 100473~|~1~|~1~|~01/STR~|~Microsurfacing of HOL-62~|~05 - 4R Maintenance - Resurfacing~|~1FCB8FF0F54B87421D718B61B6F34550D8AD70CA 88758~|~1~|~1~|~01/S<2~|~Replace deteriorating wearing surface with MSC with no (Minimal)approach work on SFN 1902040 DAR 121 1876 (US 127).~|~13 - Bridge Rehabilitation~|~FE89ED60F2AF60D64BB53C8958F9C5BCC9B25CA8 127255~|~1~|~1~|~01/BRO~|~Bridge strike repairs~|~47 - Bridge Preventive Maintenance~|~6545ED9ED50190A77FED3B77B2DE2185E62E8640 79756~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1E8EAA8150C3E0EF4B9259A4382095D795A09F30 120482~|~1~|~1~|~01/IMS~|~Plan split for parapet repair work on LUC-75-0029L bridge~|~17 - Construction Engineering~|~558FBC10AF8110ADFB7BCEBADABA5108E98300EF 112916~|~1~|~1~|~01/NHS~|~PIC-23 from 5.20 to 6.29, 6.79 to 7.21, 7.22 to 7.72, 7.73 to 9.00 and 9.01 to 11.47~|~05 - 4R Maintenance - Resurfacing~|~7F2693F9AF33AA38091ACE074B47D03AC25AA3F6 122894~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~2A2D2D346DC5F9E0B0FD7618E81FDBDA8C7BA393 113199~|~1~|~1~|~01/SAF~|~All work to construct the new overhead. Safety program funds with the funds needed over the safety program cap provided by the District.~|~21 - Safety~|~70CC4726FFF9CFC1492650E0629DB4B8AF8CBF3E 90896~|~1~|~1~|~01/SAE~|~Install sidewalks along Nelson Avenue from Truesdell Street to Warren Drive and install the missing sections of sidewalk on the south side of Truesdell Street between Nelson Avenue and Randolph Street~|~21 - Safety~|~32BB1135CC71AE33381368B95C73F18EE4DB8905 103929~|~1~|~1~|~01/MPO~|~Work eligible for providing bicycle lanes/shared use lanes along Lee Road in the City of Shaker Heights.~|~21 - Safety~|~C6B0D40F01C4C3812D8389906BEFB1B8C1E57237 100334~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project~|~21 - Safety~|~840E732C34ED4798D95BC71B40377BB1543CF5A9 110439~|~1~|~1~|~01/STR~|~Resurfacing and related bridge work in STR sections~|~05 - 4R Maintenance - Resurfacing~|~34DBD7859419BE72616CC718B5BB2941BC186BFE 110439~|~1~|~2~|~02/NFA~|~Resurfacing and related bridge work in sections not on federal aid system.~|~05 - 4R Maintenance - Resurfacing~|~EC0AB47F9A23E5D64806865E8C961AC73CD796E9 110439~|~1~|~3~|~03/NFP~|~Removal of railroad crossings.~|~22 - Rail/Highway crossing~|~A123DA9E81C0079E4A9324DE5B85E0D1297316B4 113791~|~1~|~1~|~01/NHS~|~Construction Contract funding split to repair structure JEF-22-0590 (SFN 4101804) from collision with over height vehicle.~|~13 - Bridge Rehabilitation~|~9296F674F8DAA9E3EA2C668AE663705B578E6451 109111~|~1~|~1~|~01/IMS~|~Upgrade lead in signing at the US 23/IR 270 interchange~|~21 - Safety~|~B9DA2925175FBC5C04A7C6FC9CA23C75C5D92F46 125950~|~1~|~1~|~01/NFP~|~Plan split for work associate with updgrade and replacement of guardrail at defined locations with district allocation~|~21 - Safety~|~D6B52139539BE4939E79C927A51EFA4FF34CFC3F 125950~|~1~|~2~|~02/NFP~|~Plan split for repair of damaged guardrail at locations to be determined.~|~21 - Safety~|~63B3F1C29E7925810B857C04E5360AA017A33D3F 108526~|~1~|~1~|~01/MPO~|~NOACA~|~28 - Facilities for Pedestrians & Bicycles~|~13B2C1F602CF3E5FCBCD1D74806019CAB78D8171 101549~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 145 0.84. DSR WAS-005. ER funded, 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B7C61C81652D823CFC6AF455BC4685B436DE9400 83829~|~1~|~1~|~01/NHS~|~Resurfacing project.~|~05 - 4R Maintenance - Resurfacing~|~71908E12EBE0BF3F0DF5B59AECD7D1A0FB5D635B 118427~|~1~|~1~|~01/S>2~|~Plan split for federally eligible construction items~|~10 - Bridge Replacement~|~FD536A86F14AABE0376F8F37F4F9F9CAE174CDFD 124641~|~1~|~1~|~01/IMS~|~Pavement replacement.~|~04 - Reconstruction - No Added Capacity~|~825BBCC01A7FB83C8070CE4D44EB830CA5468121 122870~|~1~|~1~|~01/CMQ~|~Signal upgrades/replacements.~|~21 - Safety~|~537356AAE892DAA8D867CF61CFA94CEACE110D91 101792~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" Licking County bridge replacement project on TR214 over stream. Project approved for CEAO federal/state exchange with a maximum dollar approval of $378,400.~|~10 - Bridge Replacement~|~315F76BBAB939859CE0DE50C1233D77C721FDAFB 103543~|~1~|~1~|~01/NHS~|~Ramp clear project. Work includes roundabout and turn lane construction. HOC US 33 11.70-11.95. Funding is Federal Safety 90% and 10% State Safety.~|~21 - Safety~|~03714A69B37AE83E5DC231264961BDF0231E5779 103543~|~1~|~2~|~02/S<2~|~Ramp clear project. Work includes roundabout and turn lane construction. HOC SR 328 11.39-11.63 and CR 418 0.00-0.21. Funding is 90% Federal Safety and 10% State Safety.~|~21 - Safety~|~63F9786C9C015EB8E0C1AD9C2399A8BC45035BA4 126219~|~1~|~1~|~01/S>2~|~Alex-Bell Road reconstruction, bridge replacement, shared use-path and sidewalk, traffic signal reconstruction, and other misc roadway improvements~|~04 - Reconstruction - No Added Capacity~|~7F28CC6A650E5B479411BDE1DB8C46AD2F09D6AD 114377~|~1~|~1~|~01/S>2~|~Reconstruct and upgrade signal at FRA SR3 and Paris Court~|~21 - Safety~|~24E3847338FE339590ECC792918CEAFFA617604B 116030~|~1~|~1~|~01/STR~|~Plan Split "01/STR/OT/ " - 4CP7 (100% Maintenance) - district wide guardrail repair.~|~21 - Safety~|~C51748857AD44F25BF520BF2565BFE4E1E9016F9 123783~|~1~|~1~|~01/S5K~|~STP 5K-50K~|~05 - 4R Maintenance - Resurfacing~|~FD5CCE34B8F3D378378E842432AC281E96522A66 123783~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~27809C13FA1477A7D2063569EAF0F20730DAA0FF 123783~|~1~|~3~|~03/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~6A34C4B34041A5355BE1130EFB4C4F27CC78ED48 92951~|~1~|~1~|~01/BRO~|~80/20 funding split for bridge work eligible for BR funds~|~13 - Bridge Rehabilitation~|~4AE5F5D3D5FF77F4C4094C50CEAFCE86BA0C08C2 112713~|~1~|~1~|~01/NHS~|~District bridge rehab project in various locations~|~13 - Bridge Rehabilitation~|~941F21AFDBD6EE778A4F84B140A4F84937E8832F 109528~|~1~|~1~|~01/SAF~|~install stop-bar radar detection~|~~|~1297CA17C28DB089F957C9533CFD8BEF473682BE 104971~|~1~|~1~|~01/IMS~|~Plan Split for Bridge FRA-270-47.32~|~10 - Bridge Replacement~|~072D37A676760FA29C1A58DE119FF1AC0AF8BD9A 79733~|~1~|~1~|~01/NHS~|~Resurfacing~|~~|~5A1185437217ED2FF11E16796B7137F0954563D2 116724~|~1~|~1~|~01/STR~|~Plan split for rural roadway~|~05 - 4R Maintenance - Resurfacing~|~A46E8B15DEC5A1434F2EB25C19C7C9A24AE239A0 116724~|~2~|~2~|~02/S5K~|~Split for CR-201 from 0.00 to 0.38 - (pop. 5,000 - 49,999)~|~05 - 4R Maintenance - Resurfacing~|~33210AC07C1F6309513EDC14A173854EBB3C4034 117380~|~1~|~1~|~01/BRO~|~Complete structure replacement utilizing CEAO BFP Federal (4B87) funds at 100% up to maximum of $1,045,000.~|~10 - Bridge Replacement~|~302802B434FA52FF3352942E5F61178B2D9DA9A8 123749~|~1~|~1~|~01/S>2~|~STP > 200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~189825B21B2226B207CE04D4E9463F2D50679656 119721~|~1~|~1~|~01/S5K~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~54B0424C97D45F23DA430BADC893260666B89F43 119806~|~1~|~1~|~01/SAF~|~Construct roundabouts at the intersections of SR 4/SR 347 and SR 31/SR 347~|~21 - Safety~|~923B50D8A86CF46D8B009F9CF9F5017B7CA9C508 96145~|~1~|~1~|~01/NHS~|~01/NHS/OT ; $842,700 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) Program. Funds needed over this amount will come from the District Preservation Program budget.~|~44 - Other~|~0C00AE496B199AC8557F88CADAC67A211871B82B 105816~|~1~|~1~|~01/MPO~|~MORPC funded items~|~04 - Reconstruction - No Added Capacity~|~0A235E467644F19726A1D43950AA2BAA026E491C 105816~|~1~|~2~|~02/S>2~|~100% Upper Arlington funded items~|~04 - Reconstruction - No Added Capacity~|~B1835A72144F3842C1F02D30235667D5DDAB3CC5 116077~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~99 - State Preventative Maintenance~|~F4C4974A98E997AC9C406EB951529E6CB554785F 125716~|~1~|~1~|~01/IMS~|~Various bridge maintenance activities in district 6~|~47 - Bridge Preventive Maintenance~|~D419FFD485DB7323F2EE59576E2C5CD7FEFE1313 109684~|~1~|~1~|~01/STR~|~Resurfacing HOL-60~|~05 - 4R Maintenance - Resurfacing~|~E665CF8711EC63343D35E2E8BC1400E945B4C33C 92779~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on a portion of SR 134 in Clinton County from SLM 2.2 to 7.52~|~05 - 4R Maintenance - Resurfacing~|~459644888BBD560F8A62C317A71F8B3F99754FF9 92779~|~1~|~2~|~02/STR~|~Split to capture costs related to Bridges CLI-134-0225 (SFN 1402870), CLI-134-0671 (SFN 1402927), and CLI-134-0682 (SFN 1402951).~|~13 - Bridge Rehabilitation~|~FCF52133C854CB450ECC53F6E8D370A494460581 110066~|~1~|~1~|~01/NFP~|~Plan split for GR maintenance~|~21 - Safety~|~0BAA1844B74C3655F58FCBD4A6CFF3A3B3392CC0 117497~|~1~|~1~|~01/BRF/CCEO~|~Replacement of the existing bridge superstructure. Repairs to the pier cap.~|~13 - Bridge Rehabilitation~|~748E1849B2452DC7104E31A7AE7E0804D2AD68EA 121790~|~1~|~1~|~01/SAF~|~GR on various routes in Adams County.~|~21 - Safety~|~AA6E300B36B7FEB74115CAA5DDAAB75B22E392A5 92070~|~2~|~2~|~02/SAF~|~added split for drainage and water lines to be reconstructed during the project~|~28 - Facilities for Pedestrians & Bicycles~|~2AA096E0E58A7CFD5B3545183CE7294C2672DEE1 92070~|~1~|~1~|~01/SAE~|~SRTS Project (sidewalks)~|~28 - Facilities for Pedestrians & Bicycles~|~2EE284381485266ABB1CCF9B0376C12A2B410CDC 107072~|~1~|~1~|~01/NFA~|~ADA VAR CR PM.~|~21 - Safety~|~C32BBBDC9DF2C037B6F7C55762769AA235C81B10 108023~|~1~|~1~|~01/NFP~|~Mowing with Additive Alternates for mowback~|~31 - Landscaping & Other Scenic Beautification~|~74082E369EE7C10347492E38BC04FD405C62EE67 123230~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation.~|~13 - Bridge Rehabilitation~|~19A05BF75DA481C2B4F0943AE04DEE2737B12F0B 95170~|~1~|~1~|~01/NFP~|~Task order PID for the consultant to provide construction engineering inspection services throughout the district.~|~17 - Construction Engineering~|~7876FE3D1FB1FEE869D6D43B49A789132E202EFB 94297~|~1~|~1~|~01/STR~|~Landslide repair project using GSM funds. ATH 56 4.95-5.02. Rural other federal aid 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~263A5A270975184BECEDAC2E36ADE3E994D52DFE 97959~|~1~|~1~|~01/NFA~|~Township Rds~|~05 - 4R Maintenance - Resurfacing~|~06EAF45373E95518C003B413D14AE1E962D888E5 113325~|~1~|~1~|~01/NHS~|~C.O. Major Rehab funds, pavement and bridge work included~|~04 - Reconstruction - No Added Capacity~|~4864F2550224DE0AA21214EFCE1AC8681A0F9466 113325~|~1~|~2~|~02/BRO~|~Bridge rehab work.~|~47 - Bridge Preventive Maintenance~|~FA7A23D437F88818254C5E6B7CBBFD61BD112B11 101797~|~1~|~1~|~01/NHS~|~Painting the linked structures >20' span.~|~13 - Bridge Rehabilitation~|~7CC62AC17C02755CF0391361146FD04AC9B17FCA 101797~|~1~|~2~|~02/STR~|~Painting linked structure >20' span.~|~13 - Bridge Rehabilitation~|~FFF01D6990C9C7EFBE95D6DA4D5C7616AC903B96 118501~|~1~|~1~|~01/STR~|~Culvert Replacement~|~~|~4CD61D682A5513E954329CFA110C05272A0903CC 100969~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~D6D8D58D5F06958B15E6A6A3A25F496794817198 87275~|~2~|~2~|~02/S<2/NP~|~Urban System asphalt resurfacing for areas of TUS-259 from 0.00 to 4.41 that ARE within the City Limits (this project travels in and out of the corporation limits several times); project includes asphalt paving, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~281780FCEBC2E53C5253A7E787D54917F9549BE3 87275~|~1~|~1~|~01/S<2~|~General system minor rehab for areas of TUS-259 from 0.00 to 4.41 that are NOT within the City limits; includes asphalt paving, pavement repair, pavement markng,~|~05 - 4R Maintenance - Resurfacing~|~30B079CDC25BF824505A9871AE0056FCC7A0A17E 87275~|~3~|~3~|~03/S<2/NP~|~Urban System rehab project on TUS-259-0.00 to 4.41;includes 100% city paid items: curb ramps, aux. pavement markings, signal loops~|~05 - 4R Maintenance - Resurfacing~|~9F5A4640B0848FB1E6BB78DA716724F8614C0E74 116924~|~1~|~1~|~01/CMQ/HUDS~|~Signal upgrades/replacements.~|~21 - Safety~|~5AA2E3EF626232E456DFB778DA04831E5DA4CDE2 118664~|~1~|~1~|~01/SAF~|~Guardrail project. ~|~21 - Safety~|~B743B553225DCCF29636930F26C78313315975FA 113712~|~1~|~1~|~01/SAF~|~Install street lighting and sidewalk on the north side fo West Road in the City of Harrison. This will require the existing bridge over I-74 to be widened.~|~21 - Safety~|~1CDACD21B9058FFA8F7FC0E8A3348A51DA74A28E 113712~|~2~|~2~|~02/BRO~|~split for the cost to widen the SFN 3107957 required as part of the sidewalk connectivity project at West Road in City of Harrison at the bridge over I-74~|~21 - Safety~|~A6AF2F82333D3862D4DCAD03EAD0CA46C7DE13CA 97564~|~1~|~1~|~01/NFA~|~Mercer County Garage fueling system with abovegound storage tank system~|~44 - Other~|~789D4DB38E791B6DF6CA92ACBBDAC4E8F458F159 124463~|~1~|~1~|~01/NFP~|~Entered for TID Involvement. ~|~44 - Other~|~FAE3CA4B5D987C1D8F9C552F9641BDF69E1B99EB 96235~|~1~|~2~|~02/S>2/GAH~|~STP>2 Urban. SLM 23.80-25.91; 26.40-26.51 Gahanna~|~05 - 4R Maintenance - Resurfacing~|~3D084E2D7499DEB33F2C40E0642408AAE2776D60 96235~|~1~|~1~|~01/NHS/GAH~|~HNS Urban. SLM 22.60-23.80 Gahanna~|~05 - 4R Maintenance - Resurfacing~|~42EA53036B007D3DB706030432A702821B660A67 96235~|~1~|~3~|~03/S>2~|~STP>2 General. SLM 25.91-25.94; 26.32-26.4; 26.51-26.81~|~05 - 4R Maintenance - Resurfacing~|~6E1729057374723A785EC7CA5142BF1E73EE2FD5 114693~|~1~|~1~|~01/SAE~|~District wide signal contract~|~21 - Safety~|~DDF769EF4C7F9169CF36B5E12E7082ABBB8EFF8A 105289~|~1~|~1~|~01/STR~|~Resurfacing COL-164~|~05 - 4R Maintenance - Resurfacing~|~916B5A0B9DA9CD2B21BDFE8D91AF1C966C98290A 105289~|~1~|~2~|~02/NFA~|~Asphalt resurfacing at Beaver Creek State Park~|~05 - 4R Maintenance - Resurfacing~|~981BF2BF3C00D2B7F06C5A739203A41AC6113BF1 125835~|~1~|~1~|~01/S>2~|~Bridge Rehab for HAM 52 31.99~|~13 - Bridge Rehabilitation~|~B1586CBBC53E03D9F94EFF26DCEFD5C9E26C4C38 92689~|~1~|~1~|~01/STR~|~This split is for rural STP funds with a state match.~|~05 - 4R Maintenance - Resurfacing~|~40B45D53A718E4D1CCD258D03A3822131607B4E0 115654~|~1~|~1~|~01/BRO~|~Bridge maintenance of SFN 4931955~|~13 - Bridge Rehabilitation~|~39E283BEA2FB389B79F2ECEF519B40A581C2F839 87572~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement~|~21 - Safety~|~3EF1B79BFBA3DE096800AF4322652BBE918BC29D 123825~|~1~|~1~|~01/IMS~|~Plan split for the emergency added temporary lane to remove traffic from the slow lane~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F1EE6F0FA82E74AF3D013728BC8AB5006A45840F 91312~|~1~|~1~|~01/IMS~|~Minor pavement rehab, FRA-270: 29.58-32.47~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~31FA7FB4C3ED7AE6519119D178F13F39DBE61748 99387~|~1~|~1~|~01/S>2~|~"01/S>2/OT/ " - Plan split for construction of a new outpost building at the existing Etna Outpost location.~|~44 - Other~|~1F0D84E92FA576176C30D06F889D315DD7E21151 85362~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~C842EB0720FC43C7AAC25D3D4EEDB97FD24C5F64 120974~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~5B1B1874EEBC9940C5AEF2DE2C2796DE86AB2BFE 100987~|~1~|~1~|~01/STR~|~DSR# BEL-008~|~04 - Reconstruction - No Added Capacity~|~F7A0EB39ED0C30F38217D67C6835701BE083AF7B 92420~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds for the District budget SAC 4PS7.~|~21 - Safety~|~5D57F4EB67DF98DA1EBA7D145ED5C82909D79D97 99923~|~1~|~1~|~01/SAF~|~Upgrade and construct sidewalk along Fifth St from Grove St to Maple St~|~21 - Safety~|~B5399531CD0BC24D7173169FCDFB6F3D439876DF 119003~|~1~|~1~|~01/NFA~|~CEAO LBR BFP funded at 100%~|~10 - Bridge Replacement~|~4E246EE8526B8BB284F4424ADB017C37D032CB4C 96726~|~1~|~1~|~01/NFA~|~Stark County Canton South Garage, partner with the City of Canton - CNG station supplied by the City of Canton with ODOT possibly building a Salt Storage Facility - currently in preliminary discussion phase.~|~~|~DAF29EE56F8CEBC02314639C5D745137081D0453 116766~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~4E8B467902A3D8BE4647A6DCCC043B5C0593F30B 112222~|~1~|~1~|~01/SAF~|~Safety funded items~|~21 - Safety~|~F2158EFB04C6A3C488094AD4A4B3E27E318B19E0 96678~|~1~|~1~|~01/NFP~|~FY 2019 Bridge Maintenance on various Routes in ATB, MAH and TRU Counties.~|~13 - Bridge Rehabilitation~|~3202BA0181CF52CE04DB28B0ACDCA8031452F6A3 79790~|~1~|~1~|~01/IMS~|~90/10 District Allocation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~64330EAF518ED4D7AC0E8C9FB35625037F40F805 96379~|~1~|~1~|~01/S<2~|~District Preservation 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Bridge replacement on 6006426 MUS-666-2.01 Intersect: Over Ditch; Not BR Eligible: Length=15 SD/FO(1) SR=0.0 DSR=4;~|~10 - Bridge Replacement~|~E00A9485FEF07A98D1510F6338FCC4BDC95A39F6 94074~|~1~|~1~|~01/IMS~|~100% state funding split for all work on this project.~|~44 - Other~|~00661EC9F24E50C06C2E482D076D9090BC731B3E 101334~|~1~|~1~|~01/STR~|~Rehabilitation of one structure.~|~13 - Bridge Rehabilitation~|~B01D138D4AC1A8188E0EE4818C5FB88AAE1C5AC2 107784~|~1~|~3~|~03/S>2~|~Items to be paid 100% by Canal Winchester including signal detection. ODOT will contribute $51,000 to the signal detection upgrade (estimated cost of replacing pavement loops)~|~05 - 4R Maintenance - Resurfacing~|~BEDCF2FCDB85FF12A2EC7E0EB63354F372349076 107784~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split (Canal Winchester): FRA-674-2.26-4.48~|~05 - 4R Maintenance - Resurfacing~|~F0FEA523C1539A75DB4EEEDA33C5D504F0BE51AA 107784~|~1~|~2~|~02/S>2~|~General System Split: FRA-674-2.20-2.26~|~05 - 4R Maintenance - Resurfacing~|~60537E60850A3A7ADA52714FC3D2E5F9308EB065 101682~|~1~|~1~|~01/NFP~|~Split for work on the structure. No federal funds at this time.~|~13 - Bridge Rehabilitation~|~3C99CF1A73CDF4FC797D3B25F36B30E80364299A 118638~|~1~|~1~|~01/S5K~|~Mill and fill multiple locations (4B97 Small City Program to provide 95% of eligible costs, up to a maximum of $1,447,766).~|~05 - 4R Maintenance - Resurfacing~|~0DD62A4FE7045D7A41BEC6DDA5A049944FDB8548 119899~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-A~|~63 - Electric Vehicles & Charging Infrastructure~|~495248A0BECD038E2733E3572103C76B185930F8 113341~|~1~|~1~|~01/NFP~|~District Maintenance Mowing - 4CP7 (State 100%) - No CAP - Mowing along Interstates and Interstate Look-a-likes~|~44 - Other~|~B48C6EF7A78F1ACF63624F66A90AEC527AA5CCD6 92176~|~1~|~1~|~01/NFP~|~Districtwide RPM project~|~21 - Safety~|~E4528AEFCDD05048801B176249E5ACC038AAB29F 126295~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~2F4474F4A6DE72CBFE95C6D3F3B24BA7099C3A27 96241~|~1~|~2~|~02/S<2~|~STP<2. SLM 0.00-0.90 WCH~|~~|~B44B5162856734CD8A92856E13A629C87E72D2C8 96241~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.90 to 5.35~|~~|~CFAC67A2FA5C84A9333432F34574395CF2C2BC9C 96241~|~1~|~3~|~03/STR~|~FAY SR 38 0.58-5.47~|~05 - 4R Maintenance - Resurfacing~|~8182B7CF041CA6F3C410E60063163B69CAD339BA 122835~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~FE3132F78B3800109A37BC2D4E4C8BDB28EDB704 118632~|~1~|~1~|~01/IMS~|~Resurfacing with asphalt concrete~|~~|~48A39E87066D297A29F83DD28B77C8EBCB0EF36D 118632~|~1~|~2~|~02/NHS~|~Resurfacing with asphalt concrete~|~~|~8CC38B48AC2603032B9D3A1B0EE4793B563C2FBD 118632~|~1~|~3~|~03/S>2~|~Resurfacing with asphalt concrete~|~~|~C46B9E768C7E96B506D003699ED7B49F6FE4F642 118632~|~1~|~4~|~04/S50~|~Resurfacing with asphalt concrete~|~~|~17571DE3E97E02D1A71CEB9C53A95496DE832FA9 118632~|~1~|~6~|~06/STR~|~Resurfacing with asphalt concrete~|~~|~20856C2D4C4E8502C1105AE6FC645F0AB9B9FBA3 118632~|~1~|~5~|~05/S5K~|~Resurfacing with asphalt concrete~|~~|~1505D12C82739043C771183DEDE88B8F9E9989E8 124487~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement~|~~|~57A970497BCB96AFD1367912B75394B049B6D5F2 115676~|~1~|~1~|~01/NFP~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DF0FAD2AE5BD1B230B25E5CD2C12B2C9DCD1C0EE 112188~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EF1EA56C3AB6AEDFA115D25656DE71696E2CC372 112188~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~84E944751EAA23F3AFD769999D4D0EA67046A407 112188~|~1~|~3~|~03/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A4E0C8F11723FFA6313601C5140AE18DA053984F 112188~|~1~|~4~|~04/STR~|~Reurfacing.~|~05 - 4R Maintenance - Resurfacing~|~064891B7EB4A0745202C5E64BD48906A3C7456E6 121514~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1C9A340D6CE13028F8C565171E2FB4CFB368F6D0 121514~|~1~|~2~|~02/IMS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~20243511F76EF120DD08D973CEC250E2145F3D0B 95142~|~1~|~1~|~01/S<2~|~Culvert replacement project. GAL 554 19.94. Urban federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~033717EBAF017C08887778EDC86FB39C2EDAE9C3 89486~|~1~|~1~|~01/SAF~|~Resurface and widen the existing pavement to 24' and widen the existing shoulder to 6-8 feet on each side of the road. Correct clear zone deficiencies, improve curv, signage, superelevation, and intersection geometrics, replace culverts as needed, MER CR 144 (Mud Pike Road) from SLM 4.30 to SLM 6.84.~|~04 - Reconstruction - No Added Capacity~|~B1FEFAEE121047B472AD75ABC57ACE0D04063281 107867~|~1~|~1~|~01/CMQ~|~The Project will change traffic signal controllers, pedestrian and vehicular signal heads and pedestrian pushbuttons. Other equipment will be replaced such as load switches, conflict monitors, relays and DC Isolators.~|~21 - Safety~|~325BE8FD7F6CE65288FDB9C8726509D6464AFA54 103633~|~1~|~1~|~01/IMS~|~Concrete pavement repairs to SUM-IR 76 from 15.18 to 15.86.~|~~|~6155C67B5CDD9139C142EDE57A049993F358E3FD 107698~|~1~|~1~|~01/STR~|~Resurfacing on US 127 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~BDE6D56C4447931BC4C0B95163AEF5BE1E1DBA01 87635~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - TBD (100% State) - Two year contract for Guardrail repairs; upgrades; and replacement within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1AAE8A86C30F15F3F55C26574C6FAD684151269C 120378~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C53B396F57D5FF805BCBF31BE1DE4D3BEF4DF9F9 88615~|~1~|~1~|~01/NHS~|~Line or replace 11' structureSFN 8001413, UNI-33-18.77, Sugar Run Branch~|~05 - 4R Maintenance - Resurfacing~|~6540F9668B5B3ED62AC07D182A2581929E5A2719 115357~|~1~|~1~|~01/MPO/NORT~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6623315120DD40BAA8AC8ED96E864EB4607F6A24 85147~|~1~|~2~|~02/NHS~|~Split for work on the NHS bridges over Lakeland Blvd and the RR not eligible for BR funding.~|~13 - Bridge Rehabilitation~|~3937FA60A7F11B3A7912F1088067C904B45088E1 85147~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split using federal BR funds for work on the structure over SR-2.~|~13 - Bridge Rehabilitation~|~A6F3CD44DD6DEDBB69F5F59CB88312C6EA844435 93433~|~1~|~1~|~01/CMQ~|~Signal upgrade. Possible turn lane additions. ADA pushbuttons, Video detection, un-interrupted power supply. Pavement markings and signing. In the City of Akron.~|~21 - Safety~|~08766A3A3A52CF0844066E36197306E6F0BF1E95 114703~|~1~|~1~|~01/STR~|~Overlay on 770.~|~05 - 4R Maintenance - Resurfacing~|~1D73A69803CA63C5C3CEDA47D0EC8C5E5D9C6AEA 114703~|~1~|~3~|~03/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~23AA3C07A9C29A2C44A6FC24ED64AE07C391A8DC 114703~|~1~|~2~|~02/NFA~|~Overlay on 770.~|~05 - 4R Maintenance - Resurfacing~|~5696E4CA0AAFC5089C791F6D44E84036CA186E7D 107159~|~1~|~1~|~01/BRF~|~Plan SPlit~|~13 - Bridge Rehabilitation~|~046672CFDF6E1A1B82FB5D2B86FC999FED037D61 106265~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-33-18.85-21.91~|~05 - 4R Maintenance - Resurfacing~|~D2CEA63BDD17E56D14079489DEE2203441E61F42 106265~|~1~|~2~|~02/S>2~|~City of Columbus (100% Ineligible Work Items)~|~05 - 4R Maintenance - Resurfacing~|~8F5630F0E1C06C5F2E5BDED9BD3FF2369D75C094 117359~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~77034B799CEC36C12B29ABD15268A19A551914BF 123741~|~1~|~1~|~01/CMQ~|~Realignment of Trabue Road with Walcutt Drive and convert the intersection into a roundabout.~|~21 - Safety~|~B2FD6F4D5E949AD3F100BAEAC0D1C12BF5D327D4 123741~|~1~|~2~|~02/CMQ~|~Realignment of Trabue Road with Walcutt Drive and convert intersection to a roundabout.~|~17 - Construction Engineering~|~D08CD8B376CB4ED8D33CC277B8D02CC06349C239 111259~|~1~|~1~|~01/NFA~|~Geneva State Park resurfacing.~|~~|~828937D2B5D549DDF5C3AA7496541BEBFBE7BCFB 98758~|~1~|~1~|~01/BRO~|~Bridge repair work using BR funds~|~13 - Bridge Rehabilitation~|~8955E2E2654178351A3ADAF7A6AACE108E81CCE4 94518~|~1~|~1~|~01/NFA~|~Improvements to the Cincinnati Barge and Rail Terminal.~|~44 - Other~|~B1B16CFBB085D9EEF6CA1E0D7BEADCD4DD7D9B44 123791~|~1~|~1~|~01/NFA~|~not on the federal aid system ps~|~05 - 4R Maintenance - Resurfacing~|~4AF8315DE8A4E6D6E08E281421FEAA3285D58677 88592~|~1~|~1~|~01/ERD~|~ROS CR205, SFN 7144253, 9.83, Intersect Indian CreekCO CC 01 100% Fed Earmark OH409 CO CC 02 100% Ross Co. local match 01/ERD/BR/Ross~|~10 - Bridge Replacement~|~A7292544314232653FC7E20EAED899F5657CC539 98936~|~1~|~1~|~01/STR~|~Resurfacing spot locations throughout the eastern part of District 11.~|~05 - 4R Maintenance - Resurfacing~|~22C44894521BBB489935F91719BA41A814E0C5CD 119249~|~1~|~1~|~01/NHS~|~NHS Plan Split.~|~05 - 4R Maintenance - Resurfacing~|~78F5B80039C6D4EE755A2453A6CD519C26A6364C 91786~|~1~|~1~|~01/SAE~|~Guardrail repair various locations~|~21 - Safety~|~96BC4A4559F9699EF6DA6B1F688B70AFE5E2D4AC 99917~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for upgrading guardrail on county roads~|~21 - Safety~|~C6588008752DF860F9F0C570912BED62A44B8E37 81828~|~1~|~1~|~01/IMS~|~Unfunded project of 70/71/315 west interchange upgrade~|~03 - Reconstruction - Added Capacity~|~107F806EABD7D0929B237DC4DFDBD00AF00A1191 100842~|~1~|~1~|~01/S<2~|~Slide repairs~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6A0A50F47AE93E52877DD7B17BFA88EED341484B 113090~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~6D042788E2ACE8DBEFBD2C997AF1E586FA789531 112628~|~1~|~1~|~01/MPO/LORD~|~Resurfacing of Hallock-Young Rd from Ellsworth-Bailey Rd to SR 45 in the Village of Lordstown.~|~05 - 4R Maintenance - Resurfacing~|~E7A2828756F83634E683408742DD73231AD5DB06 112628~|~2~|~2~|~02/NFA~|~Fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~F6255F52A9773E259E294A4B9E023541FDD8A3A1 92610~|~1~|~6~|~06/BRO~|~BR eligible bridge rehab (new decks):SFN 2513501, 270 over US23, FRA-270-52.72LSFN 2513528, 270 over US23, FRA-270-52.72A~|~13 - Bridge Rehabilitation~|~2EA757B8FB6D27B2D727E6FFDE3B795A7E61CABC 92610~|~1~|~5~|~05/NHS~|~NH bridge widening of 1 through lane on bridge rehabs:SFN 2513293, 270 over Scioto Big Run, FRA-270-54.12LSFN 2513269, 270 over Scioto Big Run, FRA-270-54.12R~|~13 - Bridge Rehabilitation~|~7D4EE8E346DCBF5F35936B1ADDBCAFDBA92AAC8A 92610~|~1~|~2~|~02/NHS~|~NH pavement addition of 1 through lane on FRA-270 SLM 52.72-54.97~|~03 - Reconstruction - Added Capacity~|~C688C28DC06D81BF82CE9DF80DA9DAB307284002 92610~|~1~|~4~|~04/IMS~|~IM funds for bridge rehab, not BR eligible:SFN 2513293, 270 over Scioto Big Run, FRA-270-54.12LSFN 2513269, 270 over Scioto Big Run, FRA-270-54.12RSFN 2513471, 270 over US23, FRA-270-52.72R~|~13 - Bridge Rehabilitation~|~C689B2E415FCF603345582605276E1E7D68C1AC4 92610~|~1~|~1~|~01/IMS~|~IM pavement replacement and construction of auxiliary lane on FRA-270 SLM 52.72-54.97~|~04 - Reconstruction - No Added Capacity~|~F4219C4FD9727C33765C5F4E0CF03F3561E80B94 92610~|~1~|~3~|~03/IMS~|~IM funding for structure removals:SFN 2513382, 270 over Access Rd, FRA-270-53.40RSFN 2513412, 270 over Access Rd, FRA-270-53.40L~|~04 - Reconstruction - No Added Capacity~|~F6666AE31F16B8A3C7A8BC45BD6ACDCF31C3CC7C 125189~|~1~|~1~|~01/SAF~|~Sign replacements~|~21 - Safety~|~8CC8C4FFEFE392FA0722C5FE60F66DF1F8B72DD6 85091~|~1~|~1~|~01/STR~|~This split is for resurfacing of SR111 and SR637 using rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~BCAF4C7204876D559522B66DF1F7916D6846BD8D 120988~|~1~|~1~|~01/S5K~|~Work within STP 5,000 - 49,999~|~17 - Construction Engineering~|~EFD950D590EAB85347D2FEEBA0F33CFA55AB0EF8 120988~|~1~|~2~|~02/STR~|~Work within STP Rural~|~05 - 4R Maintenance - Resurfacing~|~0A4A675E03FC0FC8B272598C2077351BFC820C38 117975~|~1~|~1~|~01/STR~|~Landslide Repair Project. MRG 37 8.09. Funded 80 Federal/20 State GSM.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CEEF245A4467C4FC334E258EEB21FE0BD52ED326 103015~|~1~|~1~|~01/NFA~|~ADA TR 250 2.79 ODNR Slip Repair~|~04 - Reconstruction - No Added Capacity~|~6086DCFB43DE967512D71B36771FD4FF15A4ECBC 92803~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 78 2.98, SFN 5601479. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~B21D6400E91B6EC58C712BC6AC0CA1E7BAF93923 125936~|~1~|~1~|~01/SAF~|~Re-striping in D8. ~|~21 - Safety~|~9176E84D379850E21DA521E94B89E64681DC42A3 106347~|~1~|~1~|~01/STR~|~Spot paving throughout District 11.~|~05 - 4R Maintenance - Resurfacing~|~E8A6610FB68EE9CABE09A8EED25CA6638BCDCA2E 119892~|~1~|~1~|~01/NHS~|~Pavement repairs on the concrete portion of GRE-35~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2953E609C4D56D7E4C4514110E53B64904692BE 92238~|~1~|~1~|~01/NFA~|~Salt Shed at White Oak Salt Shed~|~44 - Other~|~FF725D176F8F0CD820CF22A807D78154A7645464 104918~|~1~|~1~|~01/NFA~|~Washington Schools school bus replacement project~|~44 - Other~|~38AE611C64D775AA6E8FB52D5ED93DE929C63B41 92444~|~1~|~2~|~02/NFP/MASS~|~Drainage work and other miscellaneous 100% City funded items along State Route 172, City of Massillon, Stark County, Ohio.~|~44 - Other~|~839A2CEDAC01A0573781FC7C05D0AE96AD04657F 92444~|~1~|~3~|~03/NHS~|~Resurfacing of STA-SR 172 from 6.86 to 7.74 in the City of Massillon.~|~05 - 4R Maintenance - Resurfacing~|~B18DE3A58097FF02E26636916E658ED4E6DF0D6E 92444~|~1~|~1~|~01/NFP~|~Minor bridge work on sfn#7600755, STA-SR172-7.55, sfn#7606753, STA-SR800-8.33, sfn#7606516, STA-SR627-4.32 and sfn#7605889, STA-SR212-1.34 in Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~F2ED68F372B15127EA4AA1032216CD48E27DF930 118587~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A704B16A4ADF9DCFBF6D3C73E40F40F205FD8979 97123~|~1~|~1~|~01/SAF~|~Plan split for all the lighting maintenance work.~|~~|~B28891F386D518A4EB904FFB164493268CAE4786 105570~|~1~|~1~|~01/STR~|~All work in the project. All funds from the District Preservation Program budget. No local funds.~|~~|~4EB4851EFF2572DF3F1B5E21C14BDBDD9041D07E 114229~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements.~|~~|~6F7FD17E4D3B3C705A6971E49EDAC28B61420075 103838~|~1~|~1~|~01/NFA~|~The county will construct approximately 2,100 feet of New Beginnings Road (TR705) in Lebanon Township, starting SR 124 and ending at 53050 New Beginnings, Rd. a 20" wide asphalt road with existing base with gravel berms and open ditches.~|~01 - New Construction~|~1236A267A9CE0019879B2A60BC3F8D1AF73159DD 96895~|~1~|~1~|~01/NHS~|~Highway lighting replacement project at TUS-36-0.91 (College Street), TUS-36-1.58 (SR 258) and TUS-36-2.97 (CR 15).~|~21 - Safety~|~4170C1A1CF88F65F615F01394255F4B2A39D01E8 87038~|~1~|~1~|~01/SAF~|~Project for systematic sign upgrades in villages and other missed areas that need upgrading in Clinton County.~|~21 - Safety~|~C076C5CD7ED960C5F069463A9E62A487D06FD4FF 103135~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY19 Construction Engineering Services~|~~|~17B0AFC487E8DBE33B1F33E6B52F6446B33EB431 103135~|~1~|~2~|~02/STR~|~Plan Split 02 created for Construction Engineering Services in FY20~|~~|~1C6B875D8AD9081D359331CBC98600DD79694FD7 104238~|~1~|~1~|~01/NHS~|~Bridge repair structure MAD-42-6.32 over Oak Run. SFN 4901207~|~13 - Bridge Rehabilitation~|~F511092039A997A82AF04B4ED2C2383964BFBA58 104110~|~1~|~1~|~01/NFP~|~plan split~|~44 - Other~|~A2B670A3E83017EC4CB817A8478E6DD8B85A1CF0 101952~|~1~|~2~|~02/NFP~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~0BD732D95042CE919510C46C20EC0FB605BF97B7 101952~|~1~|~1~|~01/NFP~|~Resurfacing TRU-SR 5-20.10 to 26.00, TRU-SR 88-14.01 to 17.45 and TRU-SR 88C-0.00 to 0.02, includes rumble stripes.~|~05 - 4R Maintenance - Resurfacing~|~2A0371756B67053D88DA4A0730B95F3ED2171E6E 101952~|~1~|~3~|~03/SAE~|~Adding rumble stripes.~|~17 - Construction Engineering~|~9E396AF0D2F2380C425076D183426180EE7BFFAF 113996~|~1~|~1~|~01/SAF~|~Safety improvements at the Millikin Road/Lesourdsville West Chester Road intersection.~|~21 - Safety~|~86D29BC7D0AAD4AA122515E72C7D1CEC7715E29E 114906~|~1~|~1~|~01/IMS~|~Interstate plan split.~|~05 - 4R Maintenance - Resurfacing~|~18503C9D0B522B6DEC3BA21122E7C72C351DD9BA 116709~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB8FDDBFD51F607CA543C4A2F2AFCE78EC4AEC24 108878~|~1~|~1~|~01/SAF~|~Pavement marking on various Union County Roads~|~21 - Safety~|~44A7E049C3862331CCCE0F37BEAE05F8C3072733 110835~|~1~|~1~|~01/STR~|~Bridge replacement.~|~04 - Reconstruction - No Added Capacity~|~B83B91900B02B82740D97A38C630615C3D1151D0 92866~|~1~|~1~|~01/SAF~|~Unidentified funding for the the intersection improvement.~|~~|~144BDC1DC8736E83D269562FCCDCD17AF50BE71D 121419~|~1~|~1~|~01/NHS~|~Plan split for resurfacing US-20A from SLM 1.098 to 4.765~|~05 - 4R Maintenance - Resurfacing~|~22DEACD00499A5A5462AEAD28CE883703CE26139 121419~|~1~|~2~|~02/STR~|~Plan split for resurfacing US-20A from SLM 4.765 to 13.823~|~05 - 4R Maintenance - Resurfacing~|~E2C5E077E816BA9305C3CB5E238B05829BD978C2 94402~|~1~|~1~|~01/STR~|~Resurfacing - Rural 6.83 miles~|~05 - 4R Maintenance - Resurfacing~|~54626D4475BCC89D869A5EA9D221075B4EC37187 94402~|~1~|~2~|~02/S<2~|~Resurfacing - Urban 2.44 miles~|~05 - 4R Maintenance - Resurfacing~|~58B0D355E54CF876D8B5D8CB0CF6755C1283C293 94402~|~1~|~3~|~03/STR~|~Bridge Work: RIC-97-5.49, RIC-97-8.19~|~13 - Bridge Rehabilitation~|~2DF52C063625D4F28AC952CBB5B0E8ED4A2F876C 103119~|~1~|~1~|~01/NHS~|~District Allocation (4CP7): Replace School Flasher Signs~|~21 - Safety~|~F5E8ACF88A04D5316FD097C2CE78E68A1599C020 103119~|~1~|~2~|~02/NHS~|~4PS7~|~21 - Safety~|~C48738E6EF49854FD48D5351420CF6A2731BBD17 103119~|~1~|~4~|~04/STR~|~4PS7 funds.~|~21 - Safety~|~31BAA5E62D5B278FDE437812E5E4A8B8F6B47BFE 103119~|~1~|~5~|~05/S<2~|~4CP7~|~21 - Safety~|~4E09367800F50D3E896148BEE26679F2E9FD6760 103119~|~1~|~6~|~06/S<2~|~4PS7 funds~|~21 - Safety~|~C4E66FCE70FB41E7F3B69BE1EE2C5790BCAE015D 103119~|~1~|~7~|~07/STR~|~4CP7 Funds~|~~|~550B1DC35432FF6C5BA063064C7B8DEB89D532D6 103119~|~1~|~3~|~03/STR~|~4PS7 Funds.~|~21 - Safety~|~666240B631298713ECAD943A9D28332B9808459B 92335~|~1~|~1~|~01/IMS~|~80/20 funding split using federal Geologic Site Managment funding~|~44 - Other~|~71F09650C6A6C6C98D70BE7346A524B154B76CEB 124955~|~1~|~1~|~01/ENH/AKRO~|~Pedestrian enhancements and road diet.~|~28 - Facilities for Pedestrians & Bicycles~|~191361B777E5233B37C599CC73958E2F11D4399B 120815~|~1~|~1~|~01/S>2~|~Work for upgrading traffic signals~|~21 - Safety~|~43EF9024344D90F1917210266EC41A424A7E6C31 120815~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~21 - Safety~|~CF8AD819490CE0F9482AA5FDA99D9B5392881122 102797~|~1~|~1~|~01/IMS~|~SFN 4808045~|~13 - Bridge Rehabilitation~|~190A1093D43E336559EA3E264943890015DD3FE7 114829~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~327C9FFCF143B4ADD49CA24031A9FEE7FDD3F9FE 102621~|~1~|~1~|~01/NFP~|~Demolish timber salt building, construct new 2000 ton salt building.~|~44 - Other~|~93F5C98174D37093EA038017BCD8F5748F49EAA9 122266~|~1~|~1~|~01/S>2~|~Install bike path~|~28 - Facilities for Pedestrians & Bicycles~|~B324BC28EE6CBABE843D1E3A4B90C36C42F010D6 118841~|~1~|~1~|~01/STR~|~All microsurfacing work included in this split. ~|~05 - 4R Maintenance - Resurfacing~|~4FF9AAD88074A218F49A6FBB97FD92CD9F7D8860 99337~|~1~|~1~|~01/S<2~|~Fron the SR49/SR118 intersection at the traffic circle (SLM 16.49) to Greenmore Road (SLM 17.96) pavement planing and resurfacing with asphalt concrete along with other roadway related items.~|~05 - 4R Maintenance - Resurfacing~|~4E945692EA07CAB45DF1E428B7EE661C0619D79C 99337~|~1~|~2~|~02/S<2~|~This is for work on the City's section - approximately 550' on each approach of the N. Ohio/East Main Street intersection.~|~05 - 4R Maintenance - Resurfacing~|~00725AE47295BF2982D857C2BFE80A75261F7E49 101487~|~1~|~1~|~01/STR~|~DSR BEL-001~|~04 - Reconstruction - No Added Capacity~|~80A7BD385988FDD75270CB3CC26386E834F8176F 120673~|~1~|~1~|~01/NFA~|~added funding event CO Contr 1-CEAO ~|~13 - Bridge Rehabilitation~|~CB12D8F24A4B7D036DAFA2968F6D7AEB3D09495F 88889~|~1~|~1~|~01/IMS~|~90/10 District Allocation~|~13 - Bridge Rehabilitation~|~F7049531256D27B98BA3C356396BE8BCAA544726 115513~|~1~|~1~|~01/NFA~|~Added for Jobs & Commerce involvement~|~44 - Other~|~62D8928FF233651199D606EC9C2D0D69FBA45D65 112673~|~1~|~1~|~01/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 1~|~21 - Safety~|~AD66B54FA8999E856118A98AFEF18A95DB2435FD 112673~|~1~|~2~|~02/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 2~|~21 - Safety~|~365C9EA9EAD9B8A8BCF4E095B93B533FE21BFD90 112673~|~1~|~3~|~03/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 3~|~21 - Safety~|~3DED5660C538F927942352B00E2E15EA27ED3468 112673~|~1~|~4~|~04/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 7~|~21 - Safety~|~9CA00056CCD1774CDF66F8DDEA8FAD648D28B464 112673~|~1~|~5~|~05/ERD~|~100% Federal (C157) - replacement of lighting fixtures to retrofit for LED within District 8~|~21 - Safety~|~BE820F93C31576C1166801F00F872C3BF0EAF7C8 116314~|~1~|~1~|~01/NFP~|~Plan split for Franklin County ding and dent guardrail on various routes.~|~21 - Safety~|~B986FB680FBFAECBEABBB0B8B8DE5C53DBB8C4A7 117390~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~944034831C542E94178C78F481DF0F522578C21A 125557~|~1~|~1~|~01/STR~|~Resurfacing SR 164~|~05 - 4R Maintenance - Resurfacing~|~9EF44A47F4DD882B4EB6C448AF22E033527FDD85 96042~|~1~|~3~|~03/NHS~|~Seal up bridge expansion joints. Replace various strip seals, strip seal retainer clip repair, removal and replacement of hot applied 705.04 material on various structures. with the district. This split includes: SFN 1200062 CLA-004-0667 R, 1200038 CLA-004-0667 L, 4600894 LOG-33-1988 and 4600916 LOG-11-2080 R.~|~13 - Bridge Rehabilitation~|~1891DB300164296FEC8E29A74DB1FBC966AEE66B 96042~|~1~|~4~|~04/IMS~|~SFN 7502346, SHE 75 13.47 TR 57 Meranda Road (IF 000) - Repair/Restore expansion joint, patch railing spalls, fix damaged tube railing posts.~|~13 - Bridge Rehabilitation~|~5917E2CF7FBF5F75EB6D6DF4D337DEFABA30CB43 96042~|~1~|~1~|~01/IMS~|~Seal up bridge expansion joints. Replace various seals, strip seal retainer clip repair, removal and replacement of hot applied 705.04 material on various structures within the district. This splits includes: SFN 1204297 CLA-70-1151, SFN 5709733 MOT-235-0163 R, SFN 5701368 MOT-004-2427 L, and SFN 5711436 MOT-675-0647.~|~13 - Bridge Rehabilitation~|~63AC2F8B7D32CC34ED9332772819C4E29034A080 96042~|~1~|~2~|~02/NHS~|~Seal up bridge expansion joints. Replace various strip seals, strip seal retainer clip repair, removal and replacement of hot applied 705.04 material on various structures within the district. This split includes: SFN 1202731 CLA-68-0741 R, SFN 1202707 CLA-68-0741 L, and SFN 5700159 MOT-004-0192.~|~13 - Bridge Rehabilitation~|~BEBD6064FA00F172B3E4F539374360EB8F8A80B9 114818~|~1~|~1~|~01/SAF~|~Add and lengthen turn lanes and rebuild signal at the intersection of SR 95 and Jamesway Dr.~|~21 - Safety~|~6FEF943511E7724885209722CA46A5B195F96244 112655~|~1~|~1~|~01/MPO~|~Resurfacing of West Park Ave from Austintown-Warren Rd to Niles West Corp, and resurfacing of Austintown-Warren Rd from Lordstown East Corp Limit to Carson-Salt-Springs Rd and Burnett-East Rd to Warren South Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~66D4C6E0421050CC82B528820FB518888FED7011 87684~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~5F6F6E4A5A1785DA50A1D25256A29C8444F98EBD 87684~|~1~|~3~|~03/IMS~|~LOR SR 10 0500 SFN 4701518: (L/R)Preventive Maintenance:Expansion joint repair/replacement (048)Deck Sealing (051)Bridge CleaningReactive Maintenance:Conc patch(non-deck) (010)Deck patching(conc) (049)Minor Rehabilitation:Str steel repair (022)~|~13 - Bridge Rehabilitation~|~CA8CD5E8711EC4A8439D5C16283FD46E5DD50857 87684~|~1~|~2~|~02/NHS~|~LOR SR 10 1030 SFN 4708377:Preventive MaintenanceExpansion joint repair/replacement (048)Reactive MaintenanceConc patch(non-deck) (010)Deck patching(conc) (049)Minor RehabilitationSlope repair & prot (082)LOR SR 10 0253 SFN 4704118:Preventive MaintenanceExpansion joint repair/replacement (048)Reactive MaintenanceConc patch(non-deck) (010)Minor RehabilitationConc patching (non-deck) (010)LOR SR 10 0432 SFN 4708474/4708482 (L/R):Preventive MaintenanceExpansion joint repair/replacement (048)Deck Sealing (051)Reactive MaintenanceConc patch(non-deck) (010)LOR SR 10 0471/0472 SFN 4708512/4708520 (L/R)Preventive MaintenanceExpansion joint repair/replacement (048)Deck Sealing (051)Bridge CleaningReactive MaintenanceConc patch(non-deck) (010)Deck patching(conc) (049)Minor RehabilitationStr steel repair (022)~|~13 - Bridge Rehabilitation~|~C458CE6E990324B5E5B677EDDC2F2AB250159704 87684~|~1~|~4~|~04/SAF~|~Wet Reflective/Thermoplastic long line costs for the entire project~|~21 - Safety~|~783D976AA2DB675820A2B269DA5DE03B2AFA6755 87684~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~44 - Other~|~8BF8C8AB9D568D9CD2D528C0E0A874619A96D175 119777~|~1~|~1~|~01/STR~|~added plan split.~|~10 - Bridge Replacement~|~190DA9230D9B8032B1E1DE21A0A9822CE5E7B39E 121425~|~1~|~1~|~01/S>2~|~Added plan split for construction funding~|~01 - New Construction~|~86DD23EEF4FD4578564E87FF2B7A92630B651DFE 94424~|~1~|~2~|~02/S<2~|~Smoothseal (Urbanized Area STP): WAY 95 7.97-8.74~|~05 - 4R Maintenance - Resurfacing~|~DF6A1C851196D2CB861F5E3627D04A4AA137BABF 94424~|~1~|~1~|~01/STR~|~Smoothseal (STP Rural): WAY 95 0.00-7.97/ ASD 89 0.00-12.03~|~05 - 4R Maintenance - Resurfacing~|~22AD0EEE435AE91A46F07FBFC39317EFB266A331 109039~|~1~|~1~|~01/STR~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9FE0F5729DC68252811E691184A4D2B12E9BC412 114190~|~1~|~1~|~01/NHS~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3A9C93FC93D3888B96489BF406F86A802CEA6706 118772~|~1~|~1~|~01/NHS~|~Fine Graded Polymer Modified Asphalt Concrete Overlay (Smoothseal)~|~05 - 4R Maintenance - Resurfacing~|~8E59B9962FE7B68C1FD965DFE0E2F4BA8A949A64 115170~|~1~|~1~|~01/ENH~|~Construction of a new 1.17 mile long extension. Work includes installing a new 14 foot wide asphalt path, a trailhead plaza, storm drainage, pavement striping and signage.~|~28 - Facilities for Pedestrians & Bicycles~|~BC7A182D85549531D9654B544BB5E5E215681EB4 112540~|~1~|~1~|~01/MPO~|~Plan Split for NOACA 4TA7 contributions to the construction and/or CE~|~04 - Reconstruction - No Added Capacity~|~ED601509B9F0A6F5B4FD9B6CD757A106B2403032 110679~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 7 from 0.00 to 3.58.~|~~|~7401F579390FBC4A87DEFD1085361E7C362BE9FF 124161~|~1~|~1~|~01/NHS~|~plan split for noise wall.~|~20 - Environmental Only~|~531D8D3CABCB0D539402ADBC9EF1B2877D9582DE 110893~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix.~|~05 - 4R Maintenance - Resurfacing~|~D19E1DFC9D8D622A355BA03C59D78CCFFB98C323 110893~|~1~|~2~|~02/S>2~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~D68DEC7D1456CFE94EBB24D09DC5728013569240 92265~|~1~|~1~|~01/NFA~|~Plan Split for Sewer.~|~43 - Utilities~|~E4819A5B144CDC2A6A46E92DFDD1A33AA18E8A9F 96308~|~1~|~1~|~01/S>2~|~DEL-36-21.96 over Prairie Run~|~13 - Bridge Rehabilitation~|~2A40679A5922D2F3DED66BCEEBDE6C228D56E849 96120~|~1~|~1~|~01/NFP~|~New fabric salt building and material storage shed at the Wheelersburg Out Post.~|~44 - Other~|~ED650A3C6ABA4372FE04DBA02C623CF3AC248389 91771~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repairs. MOE 26 5.64-14.60. Rural other federal aid funded Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~684B0CCEEBE9FE3AA814D721A7365D2B5A8F8C07 115415~|~1~|~1~|~01/STR~|~Two-lane resurfacing project. Work includes an asphalt overlay, striping and berm conditioning.~|~05 - 4R Maintenance - Resurfacing~|~FB1167D83D9C151ACDA841D345D0E235D15D646D 115415~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project. Work includes an asphalt overlay, striping and berm conditioning.~|~05 - 4R Maintenance - Resurfacing~|~2B38F7E1069A374A109F9C343A639B7A6167592C 115415~|~1~|~3~|~03/NFA~|~Resurfacing of MEG CR 28A 0.00-0.229 ramp. Funded 100% State. ~|~05 - 4R Maintenance - Resurfacing~|~4C8550C1323D15288B2933E689F37B83200A32A0 124517~|~1~|~1~|~01/IMS~|~Deck overlay~|~47 - Bridge Preventive Maintenance~|~2C12E01A25B8B77B46C1F894C68CB271C8C73AFB 113528~|~1~|~1~|~01/SAF~|~Various pedestrian improvements at various locations in the City of Cincinnati for the Pedestrian Safety Improvement Program.~|~28 - Facilities for Pedestrians & Bicycles~|~2E3041B62738ED5167D214275C417BBCD1B2C418 113528~|~1~|~2~|~02/SAF~|~Install ADA compliant ped heads and push buttons with audible warnings and re stripe crosswalks at the intersection of US-22 and Sherman Ave and the intersection of US-22 & Williams Ave in the City of Norwood.~|~28 - Facilities for Pedestrians & Bicycles~|~56CA0B005A6633B717672926968E7ED53EC15471 98423~|~1~|~1~|~01/S>2~|~Resurfacing MAH SR 170 10.94 to 12.55 and MAH SR 616 0.00 to 0.03~|~05 - 4R Maintenance - Resurfacing~|~A352AFFC56256C7C714052EFB844C7EB5FE3593A 98423~|~1~|~2~|~02/NHS~|~Resurfacing MAH SR 616 0.03 to 1.12 and 1.20 to 1.26.~|~05 - 4R Maintenance - Resurfacing~|~E9E95071EB1C066E8BF648C3A3FB2D860E6AFDF3 98423~|~1~|~3~|~03/MPO/STRU~|~Concrete section repairs/replacement on MAH SR 616 2.66 to 2.74 in the City of Struthers.~|~05 - 4R Maintenance - Resurfacing~|~799450A862D8C953095BEE9824BCC48F1B039244 98423~|~1~|~5~|~05/NHS/STRU~|~Resurfacing MAH SR 616 1.12 to 1.20 and 1.26 to 2.66 and 2.74 to 2.94 and 3.33 to 3.79 Urban Paving in the City of Struthers.~|~05 - 4R Maintenance - Resurfacing~|~E6C126257CD18621A4714455BEE3F3EFCF660F66 98423~|~1~|~4~|~04/NHS~|~Minor Bridge work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~F5D5510338AA6B3000A835620E3B318DB8B3FF0C 98423~|~1~|~6~|~06/NHS~|~100% City of Struthers Items, including partial depth repairs on MAH SR 616 from 1.12 to 1.20 and 1.26 to 2.66 and 2.74 to 2.94 and 3.33 to 3.79.~|~05 - 4R Maintenance - Resurfacing~|~9A629ED37B4B7F69202082CEABE8F9BA7F7B9D5C 114391~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~7DC8F4DE1CC22ADA0F46E825255ED113E706CBB3 88673~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2020~|~~|~F2C2C82BE55A34D70529C38ABBD30E8C969403DB 119804~|~1~|~1~|~01/NHS~|~Roadway work~|~01 - New Construction~|~A869548A8BD560D9D4AF12B6AECC8BA786695F65 115424~|~1~|~1~|~01/S<2/NWRK~|~"01/S<2/BR/NWRK" - replacement of LIC CR 803 1.116 (SFN 4561430) which carries Granville Road over Log Pond Run Diversion Channel.~|~10 - Bridge Replacement~|~2E36597676A590145F8B2CE562BF7B0E91FB2396 120595~|~1~|~1~|~01/MPO~|~Demolition of a building on the former Q Lab site, 1400 Harrison Avenue, Cincinnati, OH.~|~44 - Other~|~A8C7461382D3BA647924C074F0C61C38CF44F886 88955~|~1~|~1~|~01/S>2~|~SR 261 1.19 SFN 6704964 & 6704972 plum creek & W&LE RR.~|~13 - Bridge Rehabilitation~|~76B537E44FEA4EE37B486DF487B89CA203775028 124416~|~1~|~1~|~01/S>2~|~Added split for Cherrybottom Park/Big Walnut Trail~|~28 - Facilities for Pedestrians & Bicycles~|~28A0CF872082E2564CFD8FD79A25CEC9F2692BCE 98199~|~1~|~1~|~01/STR~|~"01/STR/CV/ " - District Culvert Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert replacement on: 1) Fai-SR 159-08.53;~|~04 - Reconstruction - No Added Capacity~|~73E61374C228F539C6720E1747B4BC52DCE5ED15 98199~|~1~|~2~|~02/NHS~|~"02/NHS/CV/ " - District Culvert Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert replacement on: 1) Fai-SR 37-13.86; 2) Fai-SR 37-13.96; 3) Fai-SR 37-14.03; 4) Fai-SR 37-14.06; 5) Fai-SR 37-14.12; 6) Fai-SR 37-14.41;~|~04 - Reconstruction - No Added Capacity~|~BB685565D8C115F5EB13895837D4543408896F55 100260~|~1~|~1~|~01/MPO~|~Repair and resurface Lakeside Avenue using MPO STP funding.~|~05 - 4R Maintenance - Resurfacing~|~9502BE9CA967FCE5AD5B75BFD199536E6BC677D2 91020~|~1~|~1~|~01/STR~|~SFN 505011 MAHONING RD OVER CHARLIE RUN.SFN 5034019 BEDELL RD OVER MILL CREEK.~|~13 - Bridge Rehabilitation~|~5A00C3BA8BFAEB1E158170188510E50F9B05B17C 91020~|~1~|~3~|~03/BRO~|~SFN 5054397 LAKE PARK BLVD OVER MAHONING RIVER. SFN 5052246 LOWELLVILLE RD OVER YELLOW CREEK. SFN 5058589 US62 OVER MAHONING RIVER AND RR.~|~13 - Bridge Rehabilitation~|~70D5D79892D9E55CEDACF69F35BA0E00C26CFE97 91020~|~1~|~2~|~02/S>2~|~SFN 5058457 POWERSWAY OVER PINE HOLLOW RUN.~|~13 - Bridge Rehabilitation~|~E4912E3E9B1B685A332F8CDA011CD065A78BDD2B 25012~|~1~|~1~|~01/NHS~|~Resurface the ixisting roadway and other roadway related items on LOG US 33 from SLM 10.74 to 15.67.~|~05 - 4R Maintenance - Resurfacing~|~011491B78CABCBEEF27FC1AABBC7283FB2896D96 25012~|~1~|~3~|~03/NHS~|~Bridge deck overlay and patching on SFN 4600398 LOG 33 11.92 L Branch of Cherokee Run, SFN 4600428 LOG 33 11.92 R Branch of Cherokee Run, SFN 4600487 LOG 33 12.26 R Cherokee Run, SFN 4600452 LOG 33 12.26 L Cherokee Run, SFN 4600541 LOG 33 13.49 R Flat Branch Creek, SFN 4600606 LOG 33 14.68 R TWP RD 56, SFN 4600576 LOG 33 14.68 L TWP RD 56; SFN 4600630 LOG 33 15.21 L TWP RD 217; SFN 4600665 LOG 33 15.21 R TWP RD 217; SFN 4600819 lOG 33 15.33 R Penn Central RR; SFN 4600789 LOG 33 15.33 L Penn Central RR.~|~13 - Bridge Rehabilitation~|~5FF7FDA755B7A71D655628841A02FACDD618A1E1 25012~|~1~|~2~|~02/BRO~|~Deck patching and overlay on SFN 4600517 LOG 33 13.49over Flat Branch Creek.~|~13 - Bridge Rehabilitation~|~71595AC20CAEA5D36B740816D04D5006B7FFBB1A 106218~|~1~|~1~|~01/NHS~|~Area enhancements to include brick pavers, seating walls and lighting on Colonel Glenn Highway in the City of Beavercreek.~|~~|~4556D23B0FF9FE6A5EA5F5D9BBF71F71AC4F82E9 102409~|~1~|~1~|~01/NHS~|~Resurfacing SR 7 6.02 to 11.87~|~05 - 4R Maintenance - Resurfacing~|~8888D7F7FA1ABA03BFEE4091F00CE16B2238A0A0 102409~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings for work zone and permanent applications~|~21 - Safety~|~F4C27BCA0DC2BB30B9F053FF7A63D39DFECDE718 95751~|~1~|~2~|~02/S>2~|~LUC-295 @ SLM 6.59~|~13 - Bridge Rehabilitation~|~99014FB9F917D0244EFFC24C12177D699F46D244 95751~|~1~|~3~|~03/S>2~|~Urban section from SLM 7.60 to SLM 8.91~|~05 - 4R Maintenance - Resurfacing~|~F6820F4D8409BD292FA3D393A4BB2BAB093D56E8 95751~|~1~|~1~|~01/STR~|~LUC-295 from SLM 2.47 to SLM 7.6, then from SLM 8.91 to SLM 9.69.~|~05 - 4R Maintenance - Resurfacing~|~CE4AD794D62116A3AE01620D5661629EEA302031 95751~|~1~|~4~|~04/STR~|~Bridge split for Luc-295-3.91~|~13 - Bridge Rehabilitation~|~DE47384BE8BC68DB13B319C4CAD9C1B1E6943B0A 93506~|~1~|~1~|~01/NFA~|~Sanitary tie in at the SUM - Twinsburg outpost.~|~~|~F0DC85ED8E1B88B23D7799CA68B9F5F99791CCAA 100970~|~1~|~1~|~01/STR~|~Chip sealing ATB SR 7 from 2.37 to 6.98ATB SR 45 from 11.06 to 11.50MAH SR 14T from 0.00 to 0.91TRU SR 88 from 22.76 to 23.73.~|~05 - 4R Maintenance - Resurfacing~|~91059B2233EFAF455D5D6BD46605E934E6C0C6B7 92870~|~1~|~1~|~01/S<2~|~"01/S<2/OT/ " - Geological Site Management 4SF7 (80% Federal) / 4SS7 (20% State) - No CAP - Drilled Shaft Wall GUE-SR 209-07.48-07.56~|~04 - Reconstruction - No Added Capacity~|~4750C1E9268505038CA9A3054B9CD52A122F8472 111071~|~1~|~1~|~01/STR~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~BB0D9854C29B6746581056E9F64A193520C2E2A6 96732~|~1~|~1~|~01/STR~|~Preventive Maintenance - Chipseal~|~05 - 4R Maintenance - Resurfacing~|~9D49ADB8623C748B87BE2CB588ED87BC7F4B3A87 83045~|~1~|~1~|~01/IMS~|~Plan Split for SUM IR 77 22.32 to 24.20.~|~~|~548B01F1D1246320CC5AD44C3B03059A49B44B3D 115265~|~1~|~1~|~01/NHS~|~Rehabilitate FRA-33-0379 structure (SFN 2501171) over the Scioto River~|~13 - Bridge Rehabilitation~|~E7CE6EB539B6301962C7A2EBF4BC10010F4960D8 115265~|~1~|~2~|~02/NHS/Dub~|~Provide additional aesthetics to be paid 100% by the city of Dublin~|~31 - Landscaping & Other Scenic Beautification~|~4F3A237D1D1584B0E6BE4F56B40B832F5FC079CA 112497~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~9B178C787D99B932FC8616DAB83DDEA2D28EC707 121613~|~1~|~1~|~01/NFP~|~Debris cleanup~|~44 - Other~|~FB39EC486A4E95A3900F661BDACBDF97052FC067 125183~|~1~|~1~|~01/CMQ~|~CMAQ funding plan split for primary scope~|~21 - Safety~|~15E978A1ADEE236CFFF50141E1B52A29CDC983F2 114572~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~C8C2094F61061F4EDA89F03D0F900B86AFD2C3C7 114572~|~1~|~2~|~02/NFA~|~Chip Seal existing pavement~|~05 - 4R Maintenance - Resurfacing~|~04C064C6DFA7F3D46C5F501795BCE951A63454E0 101086~|~1~|~1~|~01/STR~|~Overlay US 36 in Darke & Miami County from Greenville to Covington: DAR US 36 SLM 14.79 to 22.76 = = MIA US 36 SLM 0.00 to 3.92~|~05 - 4R Maintenance - Resurfacing~|~C61CA0A7F59A355CDC7EFD67DFAFC9404DC8E78E 101086~|~1~|~2~|~02/S<2~|~Overlay US 36 in Darke & Miami County from Greenville to Covington: DAR US 36 SLM 13.59 to 14.79~|~05 - 4R Maintenance - Resurfacing~|~22ED43B2C66E69A60B16C0AFEBFC97039DD57B98 101086~|~1~|~3~|~03/NHS~|~Overlay US 36 in Darke & Miami County from Greenville to Covington: DAR US 36 SLM 13.39 to 13.59~|~05 - 4R Maintenance - Resurfacing~|~7439D982DD6B4E99C2F04BFECE198D67CA4A934F 113250~|~1~|~2~|~02/NFP/KENT~|~Work funded 100% by the City of Kenton~|~05 - 4R Maintenance - Resurfacing~|~983CEBA72E3826A84F89E05763E42EAA788ACB13 113250~|~1~|~3~|~03/S<2~|~For work inside of the Kenton Urban Area but outside of the City of Kenton. The right side of SR 31 from the beginning of the work at SR 292 until SR 31 enters the City of Kenton on the right side at 10.298. All funds will be provided by the District.~|~05 - 4R Maintenance - Resurfacing~|~66A8E6199B47DFE3C09C2B60C35B8E2CC6D6A94B 113250~|~1~|~1~|~01/S<2/KENT~|~Resurfacing on SR 31, SR 53 and SR 67 in the City of Kenton in Hardin County. All the resurfacing on SR 53 and SR 67. On the left side of the road on SR 31 from the beginning of the work at SR 292 until SR 31 enters the City of Kenton on the right side at 10.298 and then on both sides of SR until the end of the work at Espy at 11.142. 80% federal funds from the District budget with the 20% match provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~D69488204E3D1CFA322315674A9F9DE212FB6E6A 92163~|~1~|~1~|~01/STR~|~Culvert replacement at SLM 7.65~|~~|~356C1CA332DCE8A4E1923472BCD9733F03487F1D 91837~|~1~|~1~|~01/STR~|~General system asphalt overlay of SR 164; includes asphalt overlay, pavement repairs and pavement marking~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3F1B5F04337F05EC6316121F1D0DFC7FEFFECA59 81222~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7 (80%)/4PS7 (20%) - No CAP - Resurfacing of LIC SR 310.~|~05 - 4R Maintenance - Resurfacing~|~D7FC6459FAB2362EF263DAE1C91DA00EA13AFC30 102535~|~1~|~1~|~01/NHS~|~This plan split is for the work on US 50 in HAM County a NHS route.~|~05 - 4R Maintenance - Resurfacing~|~C70316D342486BB45725FB60DC8268FDD7DC2714 99976~|~1~|~1~|~01/ERD~|~Construct turn lanes to the US 250 WB/IR 77 NB off ramp, the IR 77 SB off ramp and on the SR 39 approach at the CR 21 intersection at the interchange of IR 77, US 250 and SR 39 near New Philadelphia. Optimize the traffic signal timing and phasing of the traffic signals along the SR 39 corridor at the interchange of IR 77, US 250 and SR 39 near New Philadelphia.~|~04 - Reconstruction - No Added Capacity~|~78D0CC426AFBCCD4F2B04E64151860FA5A33B4DE 96862~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various County roads in Medina County.~|~21 - Safety~|~72631F1EEA64B68BB725975282C145B14BB1BBE3 103716~|~1~|~1~|~01/NHS~|~NHS Pavement 80/20 Fed/City~|~05 - 4R Maintenance - Resurfacing~|~FFDEAB9DE2BF8D7A34C74B5A288A4D6EA8FFA487 103716~|~1~|~2~|~02/NHS~|~NHS Pavement 100% City of Brunswick~|~05 - 4R Maintenance - Resurfacing~|~6DA2A846FE01AA7318EB80006186036C34112803 103716~|~1~|~3~|~03/NHS~|~NHS Pavement 80/20 Fed/State District Allocation~|~05 - 4R Maintenance - Resurfacing~|~767A189D1F5F2CB7DADD3E0A7AE344C467E89422 96354~|~1~|~1~|~01/SAF~|~Provide signing, striping, and curb ramp upgrades at the intersections of Oliver & Hilltop Elementary School Entrance, SR-4 & Wyoming, SR-4 & Worthington, Worthington & Beech and the mid-block crossing of Wyoming east of SR-4.~|~21 - Safety~|~DAE37E787A73369B1B26A1C3A1D4D1B6EA410E0C 100650~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of SR 73. This is between SLM 7.2-11.19 and 14.29-20.05~|~05 - 4R Maintenance - Resurfacing~|~322970F7F30DAC00375344D337CDB591A85D3C30 100650~|~1~|~2~|~02/S>2~|~Plan split for the section of SR 73 in the large urban area and not a NHS route. This is between SLM 11.19-14.29~|~05 - 4R Maintenance - Resurfacing~|~905B87AA2417CDA0911FAD0DE443D2224B86FAA6 100650~|~1~|~3~|~03/SAF~|~For construction of an eastbound left-turn lane onto Old 73 entering Waynesville.~|~21 - Safety~|~B021F4DF56E6589557F265F9AE299D6A10FA002D 97430~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on roads within Medina County.~|~21 - Safety~|~5DCDF35EFADF5AD5D8ADAE269EEACEF44D9D2966 112783~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D29F7C8F6C80A93224ECFD914DA305F298BF447F 112783~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~C49D2C0D9A09AC42B84DCFA0F2B337D6F41A5490 97903~|~1~|~2~|~02/NHS~|~CR 627 (NC 038) roadway reconstruction including the removal and replacement of the existing pavement, curb, walk and street lighting. The street section will be changed from four lanes to three lanes with bike lanes, wider sidewalks and street lighting.~|~05 - 4R Maintenance - Resurfacing~|~178E85335A202C0AD5C700D5439F890BA0B5B9E1 97903~|~1~|~1~|~01/S>2~|~CR 627 (OC 038) roadway reconstruction including the removal and replacement of the existing pavement, curb, walk and street lighting. The street section will be changed from four lanes to three lanes with bike lanes, wider sidewalks and street lighting.~|~05 - 4R Maintenance - Resurfacing~|~E09E45F09FD2BBF5430EE007405E38A9861F06B5 111521~|~1~|~1~|~01/NFA~|~Replacement of structure > 20' span.~|~10 - Bridge Replacement~|~876C3F7B94A27DB5CDF5AF2290D9698F0AB3CF9E 116098~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in POR, STA and SUM Counties.~|~05 - 4R Maintenance - Resurfacing~|~039DE410C8D74A83477061A9658D38E3F9867594 126524~|~1~|~1~|~01/S5K/LANC~|~Improvement of Ety Road and construction of multi-use pathway.~|~03 - Reconstruction - Added Capacity~|~CEBA1D02C6257E1C385AA227381E693E69D009B2 76804~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~9E0CB8D56E8EDBB3ECBD86CE798E49C50E5F2DB5 105628~|~1~|~1~|~01/IMS~|~plan split~|~44 - Other~|~65FF420CBFEA5984DB55765AF027B04992367952 102607~|~1~|~1~|~01/NFA~|~Salt and Storage Buildings - Facilities Funds~|~44 - Other~|~4E3CB10B97D3B5E2E81309A326581A9DC3698521 86703~|~1~|~1~|~01/STR~|~Brdg Replacement On SR136, 0.01 mile south of intersection with TR269 (Berry Road), it is proposed to replace a deteriorating and structually deficient CMPA with a pre-cast concrete box. 0103551 24.600 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~B0D3A07D0260343F3DC1E9CCCAA1223E1D62ED1F 102670~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 8803242.~|~10 - Bridge Replacement~|~8932F7FFF89A556C195810038742801EF58BB8DD 116595~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~58C8660B89911788A09CEFAC58AB8DEA3A28D3EE 100063~|~1~|~1~|~01/BRO~|~Bridge Deck Repair and OverlayBridge on System Eligible~|~13 - Bridge Rehabilitation~|~3CD74FA30CA298D99CE3B6DE3CD28039454EF071 96714~|~1~|~1~|~01/NFP~|~ODNR funded project. Road repairs and chip seal at VIN Tar Hollow State Forest. Non federal aid project funded 100% state.~|~44 - Other~|~8F05219F53AEDEEF8CD939FD3D60924FDC0A8DC3 112985~|~1~|~1~|~01/NHS~|~Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures.~|~13 - Bridge Rehabilitation~|~F331F11711790BC9E6710E2FF95C1A3957540D86 112985~|~2~|~2~|~02/NHS~|~Plan Split for the resurfacing of US 52 in the project~|~05 - 4R Maintenance - Resurfacing~|~5EC9B7B31AB66ACE6A387EAA2D089F80C27CDD82 116271~|~1~|~1~|~01/STR~|~FY26 Micro~|~05 - 4R Maintenance - Resurfacing~|~9BF862FFED41C3F7E48076740939697CE5E43E82 116271~|~2~|~2~|~02/NHS~|~FY26 Micro.~|~05 - 4R Maintenance - Resurfacing~|~E8C9DDCEABE5E3B0FF08B2B57FF16716BB554806 116271~|~3~|~3~|~03/S<2~|~FY26 Micro~|~05 - 4R Maintenance - Resurfacing~|~3B1A5D6E7867B7E8C628A2299FE7AD4F5CD7664C 110950~|~3~|~3~|~03/NHS~|~Split for paving work on the NHS using MPO and urban paving funds (SR-44 & US-6DA)~|~05 - 4R Maintenance - Resurfacing~|~CE50E85E27B7F697E8C62630681961676CCE4E74 110950~|~1~|~1~|~01/S5K~|~Split for paving on the General System STP~|~05 - 4R Maintenance - Resurfacing~|~D1EF35055B1383BA2BED5BA0FE512A4CDBC03D52 110950~|~1~|~2~|~02/S5K~|~Paving work on the STP system (US-6).~|~05 - 4R Maintenance - Resurfacing~|~40961586B3C59F8B42CAD2B71F4F333E949E87A6 110950~|~1~|~4~|~04/NFP~|~Plan split for resurfacing of parking area around Chardon square at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~302683B33FA56643C9EC91B6A2A7B219E74B5BBE 100892~|~1~|~1~|~01/STR~|~SCI 139 15.00 (SFN 7303939)~|~10 - Bridge Replacement~|~BD447E63C58E4496ED5710AAAB3FC0B5359576F3 87079~|~1~|~1~|~01/STR~|~Replace two deteriorating bridges, a steel truss and a steel beam, which share a common pier and currently function as one bridge. The replacement will be one structure. SFN 1255371 CLA CR 351 3.03 and SFN 1255304 CLA CR 351 3.02.~|~10 - Bridge Replacement~|~E950A908DFD0549CC39FFA1C56E1DFF096CD4C14 106330~|~2~|~2~|~02/NHS~|~US-20 resurf.~|~05 - 4R Maintenance - Resurfacing~|~CC6B8D1B54259D29B4EA69F1179B7D4E7AA807E8 106330~|~1~|~1~|~01/SAF~|~Safety funded Plan split for left turn lane~|~21 - Safety~|~021A2ACA12932948014916F19477711227AA761A 106330~|~1~|~3~|~03/SAE~|~Plan split costs associated with wet pavement markings.~|~21 - Safety~|~10C2825D5ABCEEA92D09DA5269E28B9743B198A4 107076~|~1~|~1~|~01/NFA~|~PIK CR VAR PM~|~21 - Safety~|~545DADC7346234492582EE7FCC697A2CB824AC99 96967~|~1~|~1~|~01/IMS~|~Guardrail maintenance and repair on various routes.~|~44 - Other~|~8AEB1BD9D578929F896BF6C0BE7DAB2CB335685D 94401~|~1~|~7~|~07/STR~|~STP Rural Bridge Work: RIC-39-9.67~|~13 - Bridge Rehabilitation~|~BFD978BBDD0C443D1EEFAEEC7A1BF510583334FB 94401~|~1~|~5~|~05/SAF~|~Safety Project - Realign Lexington Springmill Rd, increase wearing surface friction on RIC-39-9.67 structure.~|~21 - Safety~|~4A0E9B3A5176797CEB2870EBE381408AB3A0CC65 94401~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: RIC-39-7.17-9.86/ RIC-309-1.05-1.61100% 7BPB 1st priority 80/20 4PF7/4PS7 2nd priority~|~05 - 4R Maintenance - Resurfacing~|~084C394385F00938178C6D4F92E11854B323E0D4 94401~|~1~|~2~|~02/S<2~|~Split Corp Resurfacing (Galion):RIC-309-0.00-0.13 LT RIC-SR-0309-0.26-0.27 LT City of Galion80/20 4PF7/4BG7 1st priority~|~05 - 4R Maintenance - Resurfacing~|~1FC7509CB0C1235A90FF7D4C27C2303C93D0FBF5 94401~|~1~|~3~|~03/S<2/MANS~|~Resurfacing - 80/20 4PF7/4BG7 Federal/Local District Preservation/City of Mansfield. RIC-SR-0039-10.26-12.00-City of Mansfield on RT, 12.00-12.07-City of Mansfield on LT, 12.07-12.11 Full Corp of City of Mansfield, 12.11-12.14- City of Mansfield on LT, 12.18-12.22 City of Mansfield LT, 12.22-12.25 City of Mansfield RT.~|~05 - 4R Maintenance - Resurfacing~|~3456B072D7EFCACAE88B9EE12B6173BC729C3501 94401~|~1~|~4~|~04/S<2/MANS~|~Resurfacing - 100% 4BG7. RIC-SR-0039-10.26-12.00-City of Mansfield on RT, 12.00-12.07-City of Mansfield on LT, 12.07-12.11 Full Corp of City of Mansfield, 12.11-12.14- City of Mansfield on LT, 12.18-12.22 City of Mansfield LT, 12.22-12.25 City of Mansfield RT.~|~05 - 4R Maintenance - Resurfacing~|~79779CCBCED44F2CFB023A5B3129A505227B8336 94401~|~1~|~6~|~06/S<2~|~RIC-SR-0309-00.00-00.13 RT, 00.13-00.26, 00.26-00.27 RT, 00.27-01.05, 01.61-03.91, RIC SR 39-05.86-07.17,9.86-10.26, 10.26-12.00, 12.00-12.07 RT, 12.11-12.14 LT, 12.14-12.18, 12.18 -12.22 RT, 12.22-12.25 LT, 12.25-13.15 1st Priority 100%-7BPB funds, 2nd Priority 100%-4PS7 funds.~|~05 - 4R Maintenance - Resurfacing~|~46DEFD903F12A6F159A1E049D60AA211879553C5 116154~|~1~|~2~|~02/NFP/DEFI~|~100% city cost items.~|~05 - 4R Maintenance - Resurfacing~|~6C3F040533555B2BAD3B4479381F64FF3A8A34AE 116154~|~1~|~1~|~01/S5K~|~Resurfacing in the City of Defiance. Funding will be 80% federal from the District Preservation Program budget with the 20% match provided by the City of Defiance. ~|~17 - Construction Engineering~|~7B488EDFBA8261BD9E3E7BCA9500A1A141080801 125710~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. WAS 26 11.85-18.45.~|~05 - 4R Maintenance - Resurfacing~|~6553E8E02FA83F3BAC03D576895B85D979D356AF 87394~|~1~|~1~|~01/NHS~|~SCI US23, 2.60 Slide Repair Located at portsmouth corp limit 2.60 miles north of Ohio River 80 Fed/20 State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4F6A6DEEE60A60349741EB2EBC876347D7FB0C3 100336~|~1~|~1~|~01/STR~|~This is a placeholder plan split entered so that funding can be entered. The project will need more than one split. The actual splits will be determined later.~|~05 - 4R Maintenance - Resurfacing~|~C7761389CA2F5BC46D9FDD42D1B5FC84E4F0FFB7 87264~|~1~|~1~|~01/NHS~|~Concrete Pavement Repair project. MEG US 33 13.32-24.31. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A2FFB40505F2F70C8560E9CF6C05EC9270BBE9BE 87264~|~1~|~2~|~02/SAF~|~Installation of centerline and edgeline rumble stripes on MEG 7 14.58-18.64. Safety funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~36933502F79DBB43BAE206378021E8C6040A8900 105876~|~1~|~1~|~01/S>2~|~Multiuse path in the City of Moraine.~|~28 - Facilities for Pedestrians & Bicycles~|~9108DC0B026F62E92F3186878D720A1D8940A456 114980~|~1~|~1~|~01/IMS~|~Field pave culvert invert~|~04 - Reconstruction - No Added Capacity~|~BF69B5499F6AB9C8BEC63AEEBB757C4F65104653 114980~|~1~|~2~|~02/STR~|~Spray applied structural liner~|~04 - Reconstruction - No Added Capacity~|~D922B527C1E560FCAD926F47F07A3C9968FACC63 108749~|~1~|~2~|~02/S5K/MAR~|~100% Local Plan Split - Work to include Curb Ramps, Pavement Repairs and Sidewalks~|~05 - 4R Maintenance - Resurfacing~|~07546F3D71DCF24ACB507B6B4070BC67C75F2A31 108749~|~1~|~1~|~01/S<2~|~All items of work associated with resurfacing of SR-95 and SR-309, excluding the 100% locally funded items.~|~05 - 4R Maintenance - Resurfacing~|~1CCD33A667FCE7AB5AB32E2A4391A1A4169D0D99 126809~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 7 over Turkey Run.~|~10 - Bridge Replacement~|~C422567128842F6503F6467277FCFC332A660B45 107989~|~1~|~1~|~01/NHS~|~Partial depth replacement and resurfacing of the roadway surface as well as new thermoplastic lane traffic striping, raised pavement markers.~|~05 - 4R Maintenance - Resurfacing~|~82845B959C14CAF797A850434E46E9417B0AE16E 107989~|~1~|~2~|~02/MPO~|~Locally funded curb repairs.~|~05 - 4R Maintenance - Resurfacing~|~21BDC4BBF5B9A34ED2403F22EB37444E75F067D2 100489~|~1~|~1~|~01/STR~|~ROS 180 (11.67-11.96) Village of Adelphi~|~05 - 4R Maintenance - Resurfacing~|~1AEDB992D88FA403747B3FD687B4FB89EADDE445 93436~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Portage Path to Hawkins in the City of Akron.~|~21 - Safety~|~D87E29FCEEE79BFD8EB299BC9454B654264DC93A 90355~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~9AF1F4DA23AD996294D428539DF7B7FF95E846DC 116786~|~1~|~1~|~01/NHS~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~7B106A1822235A4572C8F30C93849A1C93F98E76 80406~|~1~|~1~|~01/IMS~|~Split for the pavement portion of the project~|~04 - Reconstruction - No Added Capacity~|~3563EDCBBE9908D6FE99CB4F9CDEF185F4F07AAB 80406~|~1~|~2~|~02/IMS~|~Split for the bridge portion of the project.~|~~|~9A39605C5E130FCF7AD3C7DCEDE38E56142591D5 101260~|~1~|~1~|~01/IMS~|~Plan Split 01 associates with IR routes 70 and 670.~|~05 - 4R Maintenance - Resurfacing~|~D94C20F986544AADC4478539A9CD02C78B92864D 102249~|~1~|~1~|~01/STR~|~CR 175 Rural section 0.00 to 2.22, then from 4.93 to end. Rural Minor Collector~|~05 - 4R Maintenance - Resurfacing~|~8BD5E941DE75EC08E0C1FD9A5C74C7925DB391E7 102249~|~1~|~3~|~03/STR~|~County Road 175 between 4.63 to 4.93. Rural Major Collector.~|~05 - 4R Maintenance - Resurfacing~|~86FF0E77AEDF9E25F7309294FB7EF7AE4F6378C9 102249~|~1~|~2~|~02/S<2~|~County Road 175 between slm 2.22 and 4.63. - URBAN Sections~|~05 - 4R Maintenance - Resurfacing~|~E6954A62E49F7F6370EE027A4085B513C0C7C2FA 105246~|~1~|~1~|~01/STR~|~Crack Sealing for District 11~|~99 - State Preventative Maintenance~|~A6DD5552C1659C8A54AA262C66DAA7B123ECF54D 98718~|~1~|~1~|~01/BRF~|~Structure replacement HUR-TR 183-2.79 (Chenango Rd).~|~10 - Bridge Replacement~|~B4FF8A1391581775FEBCB63A4FC9584B3563D278 113103~|~1~|~1~|~01/NFA~|~Bridge replacement project over the west branch of Sunday Creek in the Village of Glouster. ATH Embrey Street, SFN 0566276. Funded 95% Federal (15% TRC)/5% Local.~|~10 - Bridge Replacement~|~85FD18E609850BD60AD34DE30F920F0C59ACF9A8 98229~|~1~|~2~|~02/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the National Highway System (NHS) Routes in District 5; Cos-16-0.00 to 7.40, Cos-36-19.06 to 19.47, Cos-36-19.47 to 26.49, Cos-16-7.40 to 8.93, Gue-22-10.28 to 15.16, Lic-13-12.06 to 13.98, Lic-79-4.11 to 4.18, Lic-79-4.60 to 6.56, Mus-16-0.00 to 11.58, Mus-16-11.58 to 14.86.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1BBDA08345FF682CE3384665EA28B7ABE9EAB8EF 98229~|~1~|~5~|~05/NFA~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the (NFA) Routes in District 5; Cos-621-0.00 to 5.98, Cos-643-0.00 to 10.81, Cos-751-4.01 to 11.42, Gue-209-0.00 to 7.07, Gue-285-9.47 to 13.46, Gue-313-0.00 to 1.24, Gue-340-0.00 to 0.86, Gue-672-0.00 to 2.74, Kno-205-0.26 to 6.94, Kno-308-0.96 to 1.32, Kno-308-2.18 to 3.00, Kno-657-0.00 to 4.93, Lic-657-0.86 to 14.91, Mrg-555-26.73 to 27.16, Mus-208-1.03 to 11.06, Mus-209-0.00 to 1.64, Mus-284-0.00 to 13.36, Mus-313-0.00 to 7.13, Mus-340-0.00 to 3.64, Mus-376-0.00 to 5.30, Mus-555-0.00 to 4.02, Non-340-0.00 to 0.71, Nob-672 0.00 to 0.37, Per-204-10.00 to 3.77, Per-555-0.74 to 3.77~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BE86BE289D20ADCDE13F4A0955DD8F22C7A3530F 98229~|~1~|~6~|~06/S>2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the OFAH-Urban routes in the Columbus Area Routes; Lic-310-0.96 to 1.72.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6633A61DA0CE98410561787665B3710F1AA9DB87 98229~|~1~|~1~|~01/IMS~|~District Preservation Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the Interstate Routes in District 5: Gue-70-0.00 to 6.55, Gue-70-22.80 to 28.48, Gue-77-0.00 to 2.50, Gue-77-11.70 to 17.70, Lic-70-0.00 to 9.65, Lic-70-28.93 to 29.42, Mus-70-0.76 to 5.56.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2626845BAC614C361B609AFC4D4A88A22C29AC9F 98229~|~1~|~3~|~03/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the S<2 Routes in District 5; Cos-36-18.95 to 19.06, Cos-83-7.99 to 8.05, Cos-83-8.05 to 8.32, Cos-83-8.32 to 8.59, Fai-22-11.74 to 13.16, Fai-204-13.86 to 15.22, Fai-204-15.22 to 16.08, Fai-360-0.00 to 1.72, Gue-22-9.28 to 10.28, Gue-209-7.07 to 7.64, Gue-209-10.78 to 13.55, Kno-36-14.17 to 16.80, Kno-36-20.82 to 20.85, Kno-308-1.32 to 2.18, Kno-661-6.10 to 7.41, Kno-768-0.48 to 1.70, Lic-37-16.82 to 17.29, Lic-79-1.24 to 2.04, Lic-79-4.08 to 4.11, Lic-79-16.25 to 17.19, Lic-360-0.00 to 0.22, Lic-657-0.00 to 0.86, Lic-661-1.70 to 1.79, Mus-22-1.17 to 8.95, Mus-93-3.45 to 4.72, Mus-146-16.21 to 17.55, Mus-555-8.60 to 11.18.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~10ED88802C192609D67DB189805358C9669563ED 98229~|~1~|~4~|~04/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Annual project for the replacement of Raised Pavement Markers on the STR Routes in District 5; Bel-265, 0.00 to 0.41, Cos-79-0.00 to 12.37, Cos-83-0.00 to 7.99, Cos-83-8.59 to 9.02, Cos-541-0.00 to 8.59, Cos-651-0.00 to 3.04, Cos-751-0.00 to 4.01, Fai-22-10.75 to 11.74, Fai-204-11.16 to 13.86, Fai-204-16.08 to 19.13, Fai-310-0.00 to 0.52, Fai-664-7.47 to 12.62, Gue-83-0.00 to 0.53, Gue-83-1.13 to 11.29, Gue-146-0.00 to 1.70, Gue-146-2.83 to 9.86, Gue-265-4.59 to 17.63, Hol-651-0.00 to 0.50, Kno-36C-0.00 to 0.12, Kno-36 -10.14 to 14.17, Kno-36-20.85 to 29.50, Kno-205-0.11 to 0.26, Kno-514-0.26 to 7.93, Kno-541-0.21 to 8.92, Kno-661-0.00 to 6.10, Lic-61-10.57 to 18.44, Lic-62-19.79 to 20.64, Lic-37-17.29 to 25.08, Lic-79-0.00 to 1.24, Lic-79-17.19 to 33.10, Lic-310-0.00 to 0.96, Lic-661-1.79 to 14.81, Mus-22-0.00 to 1.17, Mus-93-0.00 to 3.45, Mus-146-17.55 to 33.76, Mus-555-4.02 to 8.60, Mrg-555-23.06 to 23.75, Nob-265-0.00 to 0.32, Per-13-0.00 to 17.42, Per-37-15.06 to 20.69, Per-93-2.16 to 3.90, Per-93-17.89 to 27.10, Per-155-0.00 to 7.45, Per-216-0.00 to 1.60, Per-555-3.77 to 4.33, Per-595-0.00 to 2.10.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AD967873A1C0E1FF3AD43071A9B99C92A0C10788 116881~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~34E1C1C2C0D486C84C9E72F9542B9930CF156F83 111376~|~1~|~1~|~01/NFP~|~The Ashtabula TID will reconstruct as well as widen areas along E 5th St and Parkgate Ave in the City of Ashtabula.~|~44 - Other~|~CE0F7AF9B94F5962978C9BFA5A8ABA73F78C3405 111376~|~1~|~2~|~02/NFP~|~Reconstruct as well as widen E 5th St.~|~04 - Reconstruction - No Added Capacity~|~3EAB6D609759CAE20241DE08BECF4377DECA6768 99604~|~1~|~1~|~01/BRO~|~Repair structures HOL 60 0441 (SFN 3800784) and HOL 515 0397 (SFN 3802620) by replacing the existing asphalt overlay with a new rigid concrete overlay.~|~10 - Bridge Replacement~|~4241972E85F2563E098B5B78259353A2C1B82C07 100335~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code~|~21 - Safety~|~EE2FC11C46E372BC25B2D92DFC9A5D3D13BBAA84 88985~|~1~|~1~|~01/STR~|~HIG SR138 22.89 - 32.10 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Pave thru brdgs:3603180 HIG SR138 23.62 Intersect: Trib Of Rattlesnake Crk3603334 HIG SR138 29 Intersect: Opossum Run3603369 HIG SR138 30.98 Intersect: Opossum Run3603393 HIG SR138 31.5 Intersect: Duncan RunSkip SFN 360324580/20 split01/STR/PV/State3603229 HIG SR138 24.22 Intersect: Big Branch3603423 HIG SR138 31.64 Intersect: Sugar Creek3603466 HIG SR138 32.55 Intersect: Greenfield Shortline~|~05 - 4R Maintenance - Resurfacing~|~16881015251526DEB800B4DE117B4AA752621CAA 88985~|~1~|~2~|~02/S<2~|~HIG SR138 32.10 - 32.48 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Skip SFN 360324580/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~2AA9F5EB1BF2490D0B229E42178AEAB6417090B5 88985~|~1~|~4~|~04/S<2~|~HIG SR138 22.93 - 32.79 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Brdg for rehab:3603466 HIG SR138 32.55 Intersect: Greenfield Shortline80/20/split01/S<2/BR/State~|~13 - Bridge Rehabilitation~|~93B24D4FCE6C88C8306E781E8E5A9E3012328ABB 88985~|~1~|~3~|~03/STR~|~HIG SR138 22.93 - 32.79 resurfacing projectOn SR138, 2.25 miles from intersection w/SR753. Brdgs for rehab:3603229 HIG SR138 24.22 Intersect: Big Branch3603423 HIG SR138 31.64 Intersect: Sugar Creek80/20/split01/STR/BR/State~|~13 - Bridge Rehabilitation~|~D15E41A810D92D6D31059AB3DC2B3F4E27F682CD 91373~|~1~|~1~|~01/MPO~|~Resurface the Richland County Bike Trail from the Village of Lexington to the Village of Butler~|~28 - Facilities for Pedestrians & Bicycles~|~EF839672A5DB5850627985726022278F21CAF6ED 103505~|~1~|~1~|~01/SAF~|~Improve intersection of Southbound exit from I71 to eastbound SR126 by installing a signal and reconfiguring eastbound SR126 to separate traffic bound for I71 from eastbound SR 126 traffic.~|~04 - Reconstruction - No Added Capacity~|~F1EF066792AEB9BB4A8A6A9D42A612E8FBC77F2E 103505~|~1~|~2~|~02/SAF~|~Bridge rehab~|~04 - Reconstruction - No Added Capacity~|~12CABAA95BF83D7B7369C121C7CCF0D20D7DCE80 107491~|~1~|~2~|~02/S5K~|~Federal/State 80/20% Urbanized Area Outside Corp. Limit (Paving Items): ASD US 42 4.932 to 6.547, 6.730 to 7.006, 7.132 to 7.537, 9.054 to 9.39~|~05 - 4R Maintenance - Resurfacing~|~467AA131F69CE00CF2DF31A232DFA6D9B5922CCE 107491~|~1~|~3~|~03/S5K~|~Federal/Local 80/20% Urbanized Area Inside Corp. Limit (Paving Items):ASD US 42 3.799 to 4.932, 6.547 to 6.730, 7.006 to 7.132, 7.537 to 7.850, 8.923 to 9.054ASD-96-3.905 to 5.446~|~05 - 4R Maintenance - Resurfacing~|~DCC539519732B3B9717EFEFB5C6EBBA034E8ACA4 107491~|~1~|~4~|~04/S5K~|~100% Local : Urbanized Area Inside Corp. (100% City Items, Pavement Repairs, Curb Ramps, Curb Repair etc.):ASD US 42 3.799 to 4.932, 6.547 to 6.730, 7.006 to 7.132, 7.537 to 7.850, 8.923 to 9.054ASD-96-3.905 to 5.446~|~05 - 4R Maintenance - Resurfacing~|~9D9C2AB597C127E4977A8E9F6C0885B712E902EE 107491~|~1~|~1~|~01/NHS~|~Federal/State 80/20% Urbanized Area Outside Corp. Limit (Paving Items):ASD-42-8.042 to 8.547~|~05 - 4R Maintenance - Resurfacing~|~B33169076893063AD8675EF10B661ECB055381B3 107491~|~1~|~5~|~05/NHS~|~Federal/State 80/20% Urbanized Area Inside Corp. Limit (Paving Items): ASD-42-7.937 to 8.042 / 8.546 to 8.923~|~05 - 4R Maintenance - Resurfacing~|~6BC7B46769182B09427E351A8A7253102F90D5D7 107491~|~1~|~6~|~06/SAE~|~Safety application for supplemental signal heads on ASD-42 at King Road .~|~21 - Safety~|~E0AE3ADBDA7DDAB7EDCA8B0619694627A8029117 126426~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with RepairsWAY-250-18.135 to 19.245Fine Graded Polymer Asphalt Concrete OverlayWAY-250-14.714 to 18.135~|~05 - 4R Maintenance - Resurfacing~|~C98743550154E22B39B7AF533AE995BAAF9687F2 125834~|~1~|~1~|~01/NHS~|~Plan split for bridge sealing on NHS routes.~|~47 - Bridge Preventive Maintenance~|~D698F3E9AB29EA08109AECFC0B44B45281174C79 125834~|~1~|~2~|~02/NHS~|~Plan split for UNFU work. ~|~47 - Bridge Preventive Maintenance~|~A226FC5E7021A0B7FFED6F3405CD5E3D497BA6E6 116331~|~1~|~1~|~01/IMS~|~Plan split for the resurfacing on HAM-71~|~05 - 4R Maintenance - Resurfacing~|~17ADE9467BCF1265B993D10D55FBD2BEC3448886 13567~|~1~|~1~|~01/BRO~|~Plan split for replacement of the existing 4 lanes at 90/10 fed/state participation. (no added capacity)~|~10 - Bridge Replacement~|~DD8877C760E5BA55C1504D50FDEC1556919CF840 13567~|~1~|~2~|~02/BRO~|~Plan split for work adding additional 2 lanes funded at 80/20 fed/state participation. (added capacity)~|~10 - Bridge Replacement~|~CCF6B5C96860862B60CF239E7A00304892A4D130 115858~|~1~|~1~|~01/MPO~|~Resurfacing project in the City of Wooster - Large City Funds~|~05 - 4R Maintenance - Resurfacing~|~F7FA099921978A912F0E929F7ED2C0D0B720C073 95294~|~1~|~1~|~01/IMS~|~Work at DEL-71-0.03~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE688159793E902BD5C5F5EEA2112D2E915C4066 95294~|~1~|~2~|~02/IMS~|~Work at FRA-270-27.45~|~17 - Construction Engineering~|~1DFF328F642FE39A2FDEEF73772DCB3892148482 121291~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~44164F73A1040B9469990FE4C1C5AF1948EC5F78 91836~|~1~|~1~|~01/NFA~|~General System asphalt overlay on BEL-26-0.00 to 7.19; includes pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~09B8DA2A757B6A0A8B18991EE3C6A10131375940 91836~|~2~|~2~|~02/STR~|~General System asphalt overlay on BEL-148-0.00 to 12.02; includes pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~65BBD3F76720DF1958955D18080DFDF5CA2E44FF 96206~|~1~|~1~|~01/NFA~|~Constructing road imporvements to support an expansion of KTH Industries Manufacturing Plan; specifically, extending an existing northbound tapered right turn lane on SR 235 into KTH/s St. Paril Plant.~|~01 - New Construction~|~49E308CBDDA6A9C419A610B5C32EDDE87AF1F8CD 102373~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. NOB 566 1.59-4.80. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~0297983606DFE12BB48DACA991EAC75DB857858E 102373~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment on NOB 78 7.91-9.63. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F6546D84B72F57EAEB09BC4DDE9A7A1D5FAEFCC4 102373~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on NOB 78 7.57-7.91, 9.63-21.35 and NOB 566 0.00-1.59. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~853982EC73CD3AA48758FB4A6D4CEFF44629EFB0 115951~|~1~|~1~|~01/S<2/CAMB~|~City of Cambridge Oil & Shale Program Funding - 4SH7 (100% State) - See CAP Comment - Foe resurfacing and related roadway work along MR 345.~|~05 - 4R Maintenance - Resurfacing~|~19D89D5C819EA8058D728B0D054F597F4E4A7406 114404~|~1~|~1~|~01/NFP~|~All work in this project.~|~13 - Bridge Rehabilitation~|~7592149E52F38EEAA3BA012743C8E3A9649FBFCF 93837~|~1~|~1~|~01/STR~|~Culvert replacement project on VIN US 50 20.68, SFN 8200483. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~5E1BF7C1F54685DCC95D7B67DDA99703A73AEC0C 91408~|~1~|~1~|~01/STR~|~Brdg Replacement. 0101567 ADA SR41 31.31 Intersect: Crooked Run CreekNorth of intersection of SR41 & SR73. 80 Fed/20 State. BR funds eligible but only for rehab, not replace. 01/STR/BR/State~|~10 - Bridge Replacement~|~4E7A87DA3BDB1BD19E6692AD66A58722D05475D0 113833~|~1~|~1~|~01/NFP~|~ITS Camera and lowering unit replacements.~|~44 - Other~|~4B8D6ADADFCDDF567F7A7985F3D2C21E55C2D823 112555~|~1~|~1~|~01/SAF~|~Added CEAO safety funded plan split~|~04 - Reconstruction - No Added Capacity~|~3385E8205FF608E38B0FC9BFAE370BCC54C93A0A 110087~|~1~|~1~|~01/STR~|~MAD 142 from 11.44 to 13.05~|~05 - 4R Maintenance - Resurfacing~|~C52A186774B2FA39F8721988F2A0845DAC7C613D 95786~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 2.54~|~05 - 4R Maintenance - Resurfacing~|~B9F6007107EA2D08273E00CC0DA20559B7D2217F 95786~|~1~|~2~|~02/NHS~|~from SLM 2.54 to SLM 4.34~|~05 - 4R Maintenance - Resurfacing~|~C081ED82EA0E3EA71F0159C7662CCC48C20D8623 95786~|~1~|~3~|~03/SAF~|~Center Line rumble stripes from 0.00 to 0.72; and from 2.54 to 4.34~|~05 - 4R Maintenance - Resurfacing~|~D6EE28CDCAD4C10ADA9B64EFBADADDDA3932700D 95786~|~1~|~4~|~04/NFA~|~Adding event for retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~2BFAA901B021E7FCFDF5487063347B256DBDEB00 113296~|~1~|~1~|~01/MPO~|~Plan Split for MPO-funded resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~D6ACD274213E64AB89EFD30545890945435BF713 109081~|~1~|~1~|~01/NFP~|~Construction of Cold Storage Building for Riveredge, Cuyahoga County. Project DOT-190018~|~01 - New Construction~|~39E7E6A7AAF975402B3903F28D7E507C243D0339 97312~|~1~|~1~|~01/STR~|~ADA CR 100 0.00 - 7.95ADA CR 400 1.90- 6.96~|~05 - 4R Maintenance - Resurfacing~|~54ED37653D00AA214CD8C8B123FDC0F261853D8A 96330~|~1~|~1~|~01/STR~|~It is proposed, on SR506 from SR753 (SLM 0.00) to SR124 (SLM 4.34) & on SR753 from SR41 (SLM 0.00) to US50 (SLM7.10), to resurface the highway with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~A8EF889BB7BF33B3EA93D743E48FCEC855222F69 96690~|~1~|~2~|~02/NHS~|~PLan Split for roadway work added to the project. Project limits are SLM 10.97 to 14.11.~|~05 - 4R Maintenance - Resurfacing~|~239A2388454D5D88E0CD6EF3DC9F9F5DBB276E10 96690~|~1~|~1~|~01/NHS~|~Plan split to cover the costs of the bridge and roadway appurtances (Guardrail, approach slabs, embankment, etc. incidental to bridge BUT-27-14.02.). Roadway work to be covered in separate split.~|~13 - Bridge Rehabilitation~|~F3454E830B5777964E4C63F43BF385F23ECD6A84 104260~|~1~|~1~|~01/NFP~|~MOWING~|~44 - Other~|~141127459F8D8A8940090EA50F0926CF48E97CD1 105522~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~19691C5B46F33AFA55E52DDDBA1CEEBCE014948E 97018~|~1~|~1~|~01/IMS~|~SFNs 4805909, 4805917, 6201628~|~44 - Other~|~E67095EB9A928FE21CFD94F9F1EE7A8C9FB10A93 125542~|~1~|~1~|~01/NHS~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~C5090D2EEFBA24EC695B2EE3BF906FD4DCFCE6FC 119136~|~1~|~1~|~01/NFA~|~Raised Pavement Markings.~|~21 - Safety~|~7835F6F8669382B91F8FC6588B58BE1C16AD13CD 95506~|~1~|~1~|~01/S>2/PICK~|~District Preservation Urban Paving Funding - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Resurfacing on Fai-SR 204-00.00 to 00.36 in the City of Pickerington~|~05 - 4R Maintenance - Resurfacing~|~5B4C2F87B9F2110D060CCC63FC06CCECF1C9370E 95506~|~1~|~2~|~02/S>2~|~District Preservation Pavement Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-SR 204-00.36 to 06.93; 2) Fai-SR 204A-00.00 to 00.49;~|~05 - 4R Maintenance - Resurfacing~|~2E0B8C15ACF39003652ADFDC40215E97E736D147 95506~|~1~|~3~|~03/STR~|~District Preservation Pavement Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-SR 204-06.93 to 11.16;~|~05 - 4R Maintenance - Resurfacing~|~DCEB05E24BF6FE48FB4D25340846A2CBA79F9D6C 95506~|~1~|~4~|~04/S>2~|~District Preservation Other Funding - 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Reconstruction of signal at SR 204 and Harmon Road (TR221)~|~21 - Safety~|~8B71AF7F3801B5C77328B3C7014D7F701D19CC31 105838~|~1~|~1~|~01/IMS~|~All items associated with crack sealing on I-71 and US-23.~|~05 - 4R Maintenance - Resurfacing~|~3D44EA1F859F1DF2293DEACFA147F25565E9CE55 105249~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~AE82BCDB1509F5FB588D8CDEC3CAFD887558464A 105667~|~1~|~1~|~01/NHS~|~BRO 32 7.43 Invert PavingROS 35 9.28 Invert Paving~|~04 - Reconstruction - No Added Capacity~|~4202FA02E77456C82C1B8F64C66CDDBD95641B79 81078~|~1~|~1~|~01/IMS~|~Bridge Maintenance~|~13 - Bridge Rehabilitation~|~0B1C88D2B4C8214D9212D45FD755D276EBF8E3BB 93346~|~1~|~1~|~01/BRO~|~Brdg Replacement. On SR348, approximately 3.34 miles west of SR781. 0104299 ADA SR348 9.15 Intersect: Parker Hollow Stream 80 Fed/20 State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~705C9473189D9CA188F8FDF0006473435A9ABF87 93801~|~1~|~1~|~01/SAF~|~Safety Project on US68 in Mt. Orab.In the Village of Mt. Orab on US68 from Sterling Run Blvd to Hughes Blvd, it is proposed to add left turn lanes on US68 at both SR32 ramp intersections and coordinate the signaels with adjacent signals. Add right turn lane on SR32 eastbound off ramp at it intersections with US68.US68 30.72 - 31.33 & SR32 4.96 - 5.44 ~|~21 - Safety~|~FD2B669B855CCB0DE09624DC515F7A39E661C23F 89230~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all bridge work: 4305884~|~10 - Bridge Replacement~|~02C08D01E440315B66DCE1186ED7201C551656C5 89230~|~1~|~2~|~02/NFP~|~Split for Dominion East Ohio gas line supports on the new structure. ~|~10 - Bridge Replacement~|~52EE3E79FD1887C3563F2AC82858DB7B917B37BD 89347~|~1~|~1~|~01/ENH~|~Renovation of historic steam powered sternwheel tow boat. Owned by Ohio Historical Society leased to Commissioners. 80% Federal/20% Local. TEA - Enhancement program.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~D515809EEDBAF315F36C1604F6612252192AC051 95961~|~1~|~1~|~01/NFP~|~New 60' x 150' fabric salt building at 6100 tons.~|~44 - Other~|~242D7956997FF69118CE5D069B66ECE6B0622681 121397~|~1~|~1~|~01/NFP~|~FY25-27~|~17 - Construction Engineering~|~91C0AFF7073DC0B799D0DBA551B2B96B9E29A996 123600~|~1~|~1~|~01/SAF~|~Safety and speed management improvements.~|~21 - Safety~|~EA8278CC8CD8A131E6859D7B9BEAA5C7A00FC71E 92431~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6403484 PER SR669 1.22 Intersect: Center Branch Of Rush Cr; Not BR Eligible for Replacement: Length=31 SD/FO(1) SR=65.2 DSR=5~|~10 - Bridge Replacement~|~BFBEB437053E49DDD6D9454783D0D95E92DB1D4F 118578~|~1~|~1~|~01/NFP~|~Established Plna Split 01/NFP/PV~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A85454A138E1872D5A71BEC22317C7E5A64EF6C1 123269~|~1~|~1~|~01/NFP~|~Pruning.~|~44 - Other~|~DE8352085012037D6A2C4EF72079A28A02F4A8F1 122456~|~1~|~1~|~01/STR~|~UNI SR 47: Work necessary to alleviate drainage issues.~|~66 - Resilience Improvement - Highway Project ~|~88F4EB953C4AEA19BD438CA37D7B564062582DFA 75466~|~1~|~1~|~01/STR~|~0803332 BRO SR353 0.65 Intersect: Red Oak Creek80 Fed/20 State. 01/STR/BR/State~|~04 - Reconstruction - No Added Capacity~|~5A27BF938C1594B238534421ED2C01EC53322649 96755~|~1~|~1~|~01/NHS~|~NHS roadway~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9DAAE093486B18B46F79C6AA691057E3A8076603 96755~|~1~|~2~|~02/NHS~|~Bridges OTT-2-2725 & OTT-2-2757~|~13 - Bridge Rehabilitation~|~CEACDFAEA478FA8210FEFD4BCFE040BF01FBD8E9 96755~|~1~|~3~|~03/NHS~|~Plan split for beam straightening work due to impact damage to the fascia girder on OTT-269-0154~|~13 - Bridge Rehabilitation~|~DD9E322991671C76854EB39D5A3B15404E34C2F4 98489~|~1~|~1~|~01/STR~|~Salt Creek Restoration project.~|~~|~96DB4DF6C792557600E2864AEE153680026847E5 103084~|~1~|~1~|~01/NFA~|~The City is constructing road improvements to support an expansion for Green Tokai Co. to relocate their mixing facility: specifically extending Parker Avenue 268' with curb and storm drains conforming to the existing street widths to allow access to the new building addition and shipping and receiving dock area.~|~01 - New Construction~|~1274ED0A29F0CE4A3A7BCEE0C55539BB0D99D95C 122851~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded scope.~|~~|~B3E565E30D1615E72B75855DC94E3DD185ABB011 87163~|~1~|~1~|~01/IMS~|~Priority system paving of FRA-71: 0-5.29~|~05 - 4R Maintenance - Resurfacing~|~6007552AAC837D4BB311760A65E36AE31035813C 89140~|~1~|~1~|~01/BRF~|~3632954 HIG TR280 0.28 Intersect: Little Rock Creek CEAO 80 Fed/20 Local Match Highland County 01/BRF/BR/High~|~10 - Bridge Replacement~|~C00BD3A37E09794330D31ADA4F67EA4037D39260 118469~|~1~|~1~|~01/BRF/PCEO~|~Replacement of the superstructure of Bridge PRE-TR 317-4.55 (SFN: 6832695)~|~13 - Bridge Rehabilitation~|~433EB21BAE0B02E512012B41B7AFB56F55831386 106565~|~1~|~1~|~01/NHS~|~Repair damage from vehicle strike on NHS bridge.~|~13 - Bridge Rehabilitation~|~FFFFF57EB37C26898A63D498F946F58F6CC9B906 115565~|~1~|~1~|~01/BRF~|~Replace SCI-CR 33-0.19 (SFN 7330979) under the OBPP.~|~10 - Bridge Replacement~|~5B1CF13A35FD58178EA2B6DDCDAA4B2409F0931E 94072~|~1~|~1~|~01/IMS~|~Interchange highway lighting replacement at BEL-70-20.00 (Mall Road), BEL-70-20.37 (Banfield Road) and at BEL-70-21.34 (IR 470) using 90/10 4PF7/4PS7 funding sac split.~|~21 - Safety~|~B7CA4016A294E17EACC253E0F89571AD62FE5480 102886~|~1~|~1~|~01/NHS~|~Plan Split for the roadway portion of the project~|~05 - 4R Maintenance - Resurfacing~|~C99691582C4EFCFC39558E65F753300AA3352A54 102886~|~1~|~2~|~02/NHS~|~Rehab 3113841 by repalcing joints, painting, sealing super/sub, and patching sub. Rehab 3113884 by replacing parapets, joints and sealing uper/sub.~|~13 - Bridge Rehabilitation~|~CBBFEED4F121567A07A2B7238FE3246B447C1494 102886~|~1~|~3~|~03/NHS~|~MAJOR BRIDGE- Rehab 3113914 by replacing barrier, joints, and sealing super.~|~13 - Bridge Rehabilitation~|~41A279A4DD25928541A62F873AC66CAE861F44FE 102886~|~1~|~4~|~04/SAF~|~Sign replacement~|~21 - Safety~|~D20A083E195CCBE627E9AE82E96BB10A04780227 102886~|~1~|~5~|~05/SAF/NORW~|~The City of Norwood funding request the existing cobra heads with new LED heads. The plan split is for all construction work associated with the replacement of the light fixtures. ~|~21 - Safety~|~2A711DD0063045C343FC79D472DD3F78CFB62747 102886~|~1~|~6~|~06/NHS~|~Plan Split for the added Work Zone Queue Detection~|~13 - Bridge Rehabilitation~|~F2F5B21511CF21E59B2FD2575ACF93EF42ED9A3C 102886~|~1~|~7~|~07/IMS~|~Added Funding (Plan Split 7) during construction for the two ramp bridges (HAM-71-0804R (SFN:3115062) and HAM-71-0820S (SFN:3115119) that are to/over I-71. These were to be sealed with another project but were added to this one due to the ramps being closed. ~|~17 - Construction Engineering~|~C1EE4A5E4AD58ED3DE5E500A1EB88275E878F1BA 92157~|~1~|~1~|~01/BRF~|~4863690 LUC MASHB 0.08 M. N. OF SYL.-MET.Intersect: TENMILE CREEK 0004~|~10 - Bridge Replacement~|~2CA4A95FAB36446E1DA3821882F26602ED733807 109932~|~1~|~1~|~01/SAF~|~"01/SAF/PV/GRAN" - safety improvement along Newark-Granville Road (CR 539).~|~17 - Construction Engineering~|~C2F6F313CA612B63D320BCD23EC683733056C3DC 88124~|~1~|~1~|~01/IMS~|~Pavement- reconstruction (maintaining the existing).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1749387B0A2B6B5FEA7E9A0F07AF180E2150952A 88124~|~1~|~2~|~02/IMS~|~Pavement - added capacity for the new 4th lane in each direction.~|~03 - Reconstruction - Added Capacity~|~B894AFB87BD8128F12E47773C9B76F4A81DF6F57 88124~|~1~|~3~|~03/IMS~|~Bridge - reconstruction (maintain the existing).~|~13 - Bridge Rehabilitation~|~6EB3B68E777419E8AE50CA4776E6B6136FAD549B 88124~|~1~|~4~|~04/IMS~|~Bridge - added capacity for the new 4th lane in each direction.~|~03 - Reconstruction - Added Capacity~|~CE766476FDBA37FDEAE24F1957FB116756266B50 107097~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of SFN 2302047 located at Fai-SR 159-07.90~|~10 - Bridge Replacement~|~F79C4FE54D39B555E262794E43DEA377D01BA8B8 110056~|~1~|~1~|~01/NHS~|~NHS Plan Split: MAR-23-10.62-15.02~|~05 - 4R Maintenance - Resurfacing~|~BA5237A7DBC50103B0074C5BCEB8F108E3E8FFD6 93585~|~1~|~1~|~01/S<2/HANO~|~"01/S<2/OT/HANO" - Safe Route To Scool Funding 4SC7 (80% Federal) / 4BG7 (20% Local) with TRC Authorized - CAP $292,000 minus $33,837 in PE equals $258,163 remaining for Construction - Village of Hanover SRTS sidewalk project constructing 3,057 feet of sidewalk along Hainsview Drive and connecting sidewalks to Licking Valley Elementray School~|~28 - Facilities for Pedestrians & Bicycles~|~ACB3A9210B226DADC0A35E1483DBECDDC5DF7EB3 123799~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~77F83C20A0C14EA064F000232E930FB034E0BCFB 91412~|~1~|~1~|~01/STR~|~ADA SR348, SFN 0104388, 12.10 Intersect Groundhog Hollow StreamBrdg Replacement80 Fed/20 State. 01/STR/BR/State~|~04 - Reconstruction - No Added Capacity~|~7862605D788618CD4B4FC65E5BFC26A22E661710 97481~|~1~|~1~|~01/NFP~|~Culvert replacement at CFN TBD ATB-20-3.92 and CFN 040460410 ATB-46-9.80.~|~44 - Other~|~884114BEABB27D0F07F0056C50A40858D0CCA0D8 83324~|~1~|~1~|~01/BRF~|~Removal and replacement of existing single span steel truss bridge with a 110 feet long, 32 feet wide prestressed concrete box beam structure SFN 553342 MIA CR 81 0175~|~10 - Bridge Replacement~|~67EFA4EA1B86DCA8CC31EF9DAF59ABB0D6A4FC27 119021~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funded using SAC 4PS7.~|~21 - Safety~|~3031CD6A12DC46BCA69760FAB275D0E56C1A3BAB 113601~|~1~|~1~|~01/S>2~|~Construct a roundabout at the intersection of Wooster Road and Beechmont Circle.~|~21 - Safety~|~94A47330FD4FE2D5E24CE307C31E9B6F19DAC7EE 114187~|~1~|~1~|~01/NHS~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~19F6CA906BCC8819F54524A8333E2CB7A136D3CE 97709~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/OT/KCEO" - Knox County installation of new guardrail and upgrade of existing utilizing CEAO funds with a max of $300,000 at 100%.~|~21 - Safety~|~9732EB697588234AD82A4DCC10AD566A9B0D6A49 101158~|~1~|~1~|~01/STR~|~AC overlay with repairs:SHE SR 48 0.00~|~05 - 4R Maintenance - Resurfacing~|~B6A1DE6F73A74F622FC829D26116E11AC9393AC8 98588~|~1~|~1~|~01/STR~|~District Preservation Program funds.~|~10 - Bridge Replacement~|~70A6F92C5EBC9AAF57D1C045CBF8BB2B3DB361C4 94205~|~1~|~1~|~01/NFP~|~Construct Warren County Full Service Facility~|~01 - New Construction~|~4AE4B8F7C74AB04A5464BBCD9570B7E3959EA220 113007~|~1~|~1~|~01/STR~|~Replace bridge GRE-72-0771 which carries SR 72 over Caesar Creek in Jamestown, Ohio~|~10 - Bridge Replacement~|~895E1FE01C0FA6B3C6FFF094FC7DE3F21C34B49F 101026~|~1~|~2~|~02/NHS~|~Plan Split for the NHS locations within the project.~|~21 - Safety~|~FA9123E0B0DD6739B733B4C6D91552958ABAFE93 101026~|~1~|~1~|~01/IMS~|~Plan split for the interstate locations~|~21 - Safety~|~FD58C12A8132F9A8C480220988A22A0B968B1E02 101026~|~1~|~4~|~04/STR~|~Plan Split for the Rural locations within the project~|~21 - Safety~|~7E5AC1C03073C370A0C9C9B7CB891FBEBE4C1C65 101026~|~1~|~5~|~05/NFA~|~Plan Split for the locations not on a Federal Aide System route~|~21 - Safety~|~600E60E6A7DDE6419E766E290C3398F45B3C0290 101026~|~1~|~3~|~03/S>2~|~Plan Split for the Large Urban locations within the project~|~21 - Safety~|~6E42E22D212C198846F9B47D77CCF7E5EA2B1C55 84222~|~1~|~1~|~01/MPO~|~Reconstruction of New Germany-Trebein Road from Golf Course Drive to .13 mi. east of Wyndham Drive to correct the existing substandard pavement width and to improve sight distance by widening to three lanes.~|~04 - Reconstruction - No Added Capacity~|~6AA52F848F0DBFFAB57691F21B18923B1A701CA6 101031~|~1~|~1~|~01/IMS~|~Systematic Sign Replacement on CLI-71, GRE-71, HAM-275, HAM-74~|~21 - Safety~|~1F807D6CE2E281B503FD035BA489C2810C006118 122512~|~1~|~1~|~01/IMS~|~Emergency Bridge Hit~|~47 - Bridge Preventive Maintenance~|~FAEF99086473BEC01810F92635AAE4F9ABFAAAD0 122512~|~1~|~2~|~02/IMS~|~Secondary bridge hit from 2026 repair ~|~~|~8CDD0D6CB7831A5EF4F749FBF7A1E483E8D1071C 90924~|~1~|~1~|~01/NFA~|~Sidewalks~|~28 - Facilities for Pedestrians & Bicycles~|~A69B5B5FF7A035DF2CD660D557811D5BB18A7A17 123817~|~1~|~1~|~01/BRO~|~Plan split for all bridge work on WOO-75-0301 & WOO-75-1019 bridges~|~13 - Bridge Rehabilitation~|~D03DD7546236EBBBEA621C89FB5651B99CA1E47F 98567~|~1~|~2~|~02/S<2~|~Resurfacing on PRE-127 near Eaton; from SLM 14.71-15.46~|~05 - 4R Maintenance - Resurfacing~|~B235CA2B9E224AD666E1EF2A7C6AA2755363E1FD 98567~|~1~|~1~|~01/STR~|~Plan split for the related pavement work/resurfacing on the rural portion of US 127 in Preble County. Between SLM 15.46 - 23.78~|~05 - 4R Maintenance - Resurfacing~|~8EB9A89B6F2A3B0EE4BE24761764902656AADE42 126329~|~1~|~1~|~01/NFA~|~Created plan split for detailed design - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~1860B5145C95822A379CC45C00A046E5DC40DD40 106701~|~1~|~1~|~01/NFA~|~Asphalt resurfacing of ATH CR 107 from SR 13 to the Morgan County line. Total of .96 miles. FLAP funded. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~F515634E1B6F3DA4DDF02D02EF5907F86820690B 92100~|~1~|~1~|~01/MPO~|~An MPO funded project to construct a roundabout at LUC CR124 2.51-2.53/LUC CR128 2.02-2.04~|~21 - Safety~|~CB2941EEBA4A1BCA6B67F687877300488B6DFC54 103300~|~1~|~1~|~01/NFP~|~Split for pavement markings throughout the district.~|~21 - Safety~|~26E5249BD337AE5B1CF3C15EB2DFB2198754E271 114385~|~1~|~1~|~01/STR~|~Established Plan Split 02/STR/PV/ - 80% Federal, 20% State~|~05 - 4R Maintenance - Resurfacing~|~9669AEC919B82833AC164CD51C9903C63CEA321D 114385~|~1~|~2~|~02/NFA~|~Established Plan Split 01/NFA/PV/ - 100% State~|~05 - 4R Maintenance - Resurfacing~|~9C9F252F5BB88C7E4DC9FC52AAD20814E637DB6A 113732~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at CR7 (Walnut Creek Pike/Circleville-Groveport Road) and TR 39 (Bell Station Road)~|~21 - Safety~|~E195444D7174A89EE7ABF677D5DBCEFDBE860E17 103169~|~1~|~1~|~01/NHS~|~Resurfacing on Wayne Avenue in the City of Dayton~|~05 - 4R Maintenance - Resurfacing~|~6B32CA0C091048D7F35868EBC3E2E13C360423E2 107730~|~1~|~1~|~01/STR~|~All work in this project. Federal and state District Preservation Program funds.~|~04 - Reconstruction - No Added Capacity~|~8B7E53878EF7033A2F9799898B63F1EC267B4239 123259~|~1~|~1~|~01/SAF~|~Sign replacement.~|~21 - Safety~|~DF4D0F075291E392772D0AA3BBF747872EA43CF4 103490~|~1~|~1~|~01/NFP~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~44 - Other~|~1F5526D1D3DE4350A3A9391F09A01458EF1A1B19 93152~|~1~|~1~|~01/BRF~|~Bridge replacement project. GAL TR 752 0.29 (SFN 2743531). Federal 80% and 20% Local.~|~10 - Bridge Replacement~|~C60ED3B28864C71FD2A833FC3DCB3566C403831F 96686~|~1~|~1~|~01/STR~|~Plan Split for costs associated with bridges PRE-35-1541 and PRE-35-1986 including approach roadway costs, guardrail, etc. specific to these two locations.~|~10 - Bridge Replacement~|~FED75D8AE5BC689FA5DF3DDC338987070C5D4143 96686~|~1~|~2~|~02/S<2~|~Plan split for costs associated with bridge PRE-35-12.58 including approach roadway costs, gaurdrail, etc. specific to this location.~|~13 - Bridge Rehabilitation~|~CD9C861DA7A2C945B37334A9F766E0832D03136C 105411~|~1~|~1~|~01/STR~|~Bridge repair on rural route bridge.~|~13 - Bridge Rehabilitation~|~FF6DBA9CF1C2C4F437FC952E49F6F2C2889A445F 105411~|~1~|~2~|~02/NFA~|~Bridge repair on bridges not on the Federal Aid System.~|~13 - Bridge Rehabilitation~|~D2D9B63CF19F0BFCD26515975C55A48C0DA8E695 105948~|~1~|~1~|~01/SAF/PCEO~|~Perry County CEAO HSIP Funding - 4HB7 (Federal 100%) and ODOT HSIP Funding - 4HJ7 (Federal 100%) - See CAP Comment - Replacement of existing pavement marking on various county roads in Perry County.~|~21 - Safety~|~D5758F2804FB5A820824FF2CA1FB917A8384C748 84686~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds for the District budget SAC 4MP7.~|~21 - Safety~|~CB65B0017E61FFB35415593A75877E799365C680 124242~|~1~|~1~|~01/IMS~|~Plan split for all work to repair LUC-24-2498 bridge~|~13 - Bridge Rehabilitation~|~A1AF30B23AD29C91EFC982A61418B71258DB00B0 120156~|~1~|~1~|~01/SAF/COSH~|~Signal reconstruction at Browns Lane/Second Street and Plaza Drive/Second Street intersections.~|~21 - Safety~|~C4FD7B72AA878E8E74C9139CDD7B239497E0E843 113534~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 16.38. Funded 100% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2CBD45ADE215E5AEEF889A811A2DD6643435D19 100961~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~D508B6E90CA58F195D1798E8DEA9CE854B035041 100961~|~1~|~1~|~01/IMS~|~The treatment will be a 2? mill and fill using Superpave Interstate 70 in Montgomery County. MOT IR 70 SLM 6.71 to 10.41.~|~05 - 4R Maintenance - Resurfacing~|~A84DF1346AD206DFB04B31541D7688D84E8E513B 97202~|~1~|~1~|~01/SAF~|~Profile improvement and tree removal along SR 164 to improve the intersection sight distance at the SR 164 & SR 558 intersection.~|~21 - Safety~|~8EB01334BEFE8176D9A8507447259702189A17B2 105150~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 90% Federal (4PF7) / 10% State (4PS7) - No CAP - Rehabilitation of LIC-70-5.66 (SFN 4503066) carrying TR 152 over IR 70.~|~13 - Bridge Rehabilitation~|~8A0CDADA72B0A822483B8E69ACD0AA2B96265DBE 99022~|~1~|~1~|~01/SAF~|~District wide raised pavement markers~|~21 - Safety~|~F4921814C228E34B925A80A6E807E8FB381DA361 91490~|~1~|~2~|~02/S>2~|~FRA-317: SLM 15.96-16.15, FRA-710: SLM 0-4.06Columbus urban paving on STP routes~|~05 - 4R Maintenance - Resurfacing~|~5D3D6BFA940C415599E5B2754FBD5658DE77478E 91490~|~1~|~3~|~03/NHS~|~FRA-317 SLM 16.15-16.70Columbus urban paving on NHS route~|~05 - 4R Maintenance - Resurfacing~|~62FF809D149C46622D28558D887A4A624587080A 91490~|~1~|~1~|~01/S>2~|~FRA-317 SLM 15.93-15.96General system paving on STP route~|~05 - 4R Maintenance - Resurfacing~|~86FD34FCB5EF7207590FAA9EF2110DE6B7365905 102665~|~1~|~1~|~01/NFA~|~Landslide repair project. GAL 790 4.38.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DDF9DDCECBB09294EEFF6411158C8C5AB08D56A1 101353~|~1~|~1~|~01/NHS~|~Seal concrete bridge decks on SR 7 in Belmont County~|~47 - Bridge Preventive Maintenance~|~2253E195E62CC9D42B1B7C940B11F43184D9EA80 109607~|~1~|~2~|~02/ENH~|~Construct sidewalks and curb ramps~|~28 - Facilities for Pedestrians & Bicycles~|~03D4BF41CF0CBE980408CC4746CA597262B0F9FA 109607~|~1~|~1~|~01/S>2~|~Reconstruct the roadway~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~217FD47D30125600F73C135514DD9C3D9951E7E0 98690~|~1~|~1~|~01/NFA~|~CLA TR 98 4.83 (SFN 1244043) Newlove Road bridge replacement. This project will be to replace a deteriorating steel pony truss bridge on newlove Rd. over Beaver Creek.~|~10 - Bridge Replacement~|~A0BBBCD66CEF16795441435DAC3A688A5B32FBF6 92836~|~1~|~1~|~01/SAF~|~Intersection improvement~|~21 - Safety~|~7DC1B47F6C7EC94B5F805DC11FE7CAC6DFB0D5C2 92836~|~1~|~2~|~02/SAF~|~100% Rural Lorian County Water Authority (RLCWA) funding responsibility~|~21 - Safety~|~D170894ED67029A995D6DC92863534638CFF63B5 116623~|~1~|~1~|~01/MPO/STOW~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7CB6EACA2489241F32B8D9D31CFEA72D13540308 120304~|~1~|~1~|~01/BRO~|~Clean and paint structural steel beams on bridge carrying US 36 over the Tuscarawas River.~|~47 - Bridge Preventive Maintenance~|~D77D51EAB4FBA60195F2F1C58D850724A746DAE1 118641~|~1~|~1~|~01/NFA~|~Vinton SR 328 8.97 160 ft Rockfall Hazard Remediation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~32D94DCF53815EBBCCFB7A2DD9282E6B5656DFAB 94419~|~1~|~1~|~01/STR~|~Two Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~421EA2DBB636A7BDEB96BEFAC7CC0836DCE169E5 94419~|~1~|~2~|~02/STR~|~Bridge work to be determined.~|~13 - Bridge Rehabilitation~|~A5B40CA0C1379CBB90F6038586D75C4A3904E3EE 98285~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP ? deck overlay and other repairs on 1) 3001776 GUE-70-18.47 Intersect: IR 70 over TR 74; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=89.3 DSR=6; 2) 3001806 GUE-70-18.47 Intersect: IR 70 over TR 74; Not BR Eligible for Rehabilitation: Length=106 SD/FO(0) SR=89.3 DSR=6;~|~13 - Bridge Rehabilitation~|~0D9449DE6B32C921FD49256502B04982FD122CFC 126912~|~1~|~1~|~01/BRO~|~Rehabilitate bridge carrying SR 267 over Longs Run.~|~13 - Bridge Rehabilitation~|~90B04917CE0ACF8629CF84E6D87F47256604BD61 83765~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7.~|~10 - Bridge Replacement~|~BF9B7102155D78155E248EED89E2B41BAF777839 96568~|~1~|~2~|~02/STR~|~Resurfacing of TRU SR 305 from 2.45 to 7.88, 8.68 to 13.58 and 16.84 to 23.93, Resurfacing TRU SR 305D from 0.04 to 0.16.~|~05 - 4R Maintenance - Resurfacing~|~D2C742579CD0D9ED8FCDD419FA8499571076E463 96568~|~1~|~1~|~01/S>2/CORT~|~Resurfacing TRU-SR 305 from 15.28 to 15.49, Urban Paving in the City of Cortland.~|~05 - 4R Maintenance - Resurfacing~|~5C59DD190A106A7E0A6B21D710CADA5923FB84D0 96568~|~1~|~3~|~03/S>2~|~Resurfacing of TRU SR 305 from 7.88 to 8.68 and 13.58 to 16.84.~|~05 - 4R Maintenance - Resurfacing~|~B4B47F426538DEC7A9F21B60616B26FF5251A395 96568~|~1~|~4~|~04/NHS~|~Minor rehab to linked structure >20' span.~|~13 - Bridge Rehabilitation~|~065ADCC2069A323914B3BAA7712CFC16E9567458 96568~|~1~|~7~|~07/STR~|~Minor rehab to linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~CFB8465BE9F4956B4CC16DD25579A04D4ED4B5A9 96568~|~1~|~6~|~06/STR~|~Minor rehab to linked structures >20' span.~|~13 - Bridge Rehabilitation~|~34074C6FC7B130237CF37560C5E7A66C3E3BCE29 96568~|~1~|~5~|~05/S>2~|~Minor rehab to linked structure > 20ft span.~|~13 - Bridge Rehabilitation~|~335EE7B3CC0A0ECCBD565693967275C7777C8C9E 118768~|~1~|~1~|~01/NHS~|~Smooth Seal~|~05 - 4R Maintenance - Resurfacing~|~992370AC87A74014A44FECBB97AC5AC894BA1A3D 117711~|~1~|~1~|~01/IMS~|~Plan split for resurfacing of interstate routes~|~05 - 4R Maintenance - Resurfacing~|~0FBBD292DF3F52C2086758A76BF3AA882B9F87F3 117711~|~2~|~2~|~02/IMS~|~Plan split for approach slab jacking work on LUC-475-0254 bridge~|~47 - Bridge Preventive Maintenance~|~777F97C838F09DBB4B2949C3F04CFAF5050CEFB3 117711~|~2~|~3~|~03/NHS~|~Plan split for resurfacing work on Dussel/Salisbury~|~05 - 4R Maintenance - Resurfacing~|~4097177853F8708AC7A431D9CF4A1A15B8A5D737 105497~|~1~|~1~|~01/STR~|~Plan Split for Rural UNI 37 bridge~|~10 - Bridge Replacement~|~0FDF790CF96B50025BB22EDA465D76916F5CE836 109375~|~1~|~1~|~01/NFA~|~ODNR Jackson Lake Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~25CF20ADB17CEC8C5F27138BE0E1075D977B3E14 120457~|~1~|~1~|~01/STR~|~Bridge replacement~|~10 - Bridge Replacement~|~F0DC150A394FEFECA891F344B21AAD10395DEE2C 97347~|~1~|~1~|~01/BRF~|~TR 221 2.33 Roberts Rd Brdg~|~10 - Bridge Replacement~|~9FBFE7F78BEE8B70F234F459FAF591C74A36D3F0 89293~|~1~|~2~|~02/NHS~|~A partially funded urban paving project to resurface LUC US20 16.61-18.62 in the City of Maumee. This split is for the resurfacing from curb to curb at 50% and 50% local.~|~21 - Safety~|~D9E352343AB8FA1440E2E800F1EDFF6F1D3E354F 89293~|~1~|~1~|~01/SAF~|~A partially funded safety project to improve safgety access along LUC US20 16.61-18.62 in the City of Maumee. This split is for all costs other than roadway pavement (surface & Intermediate Courses) between curbs funded with safety funds @ 90% federal and 10% local.~|~21 - Safety~|~E95F11A73477AED7E4FCEFEF0DD5303C709C5452 118424~|~1~|~1~|~01/NHS~|~WAY US 0250 27.50~|~04 - Reconstruction - No Added Capacity~|~4AC6AD08FE55BDAE0581D5815F2ACB37D2AE0C13 85152~|~1~|~1~|~01/NFA~|~Upgrade existing roadway by applying asphalt surface at Raccoon Creek Park in GAL Co. Work to be performed by purchase order contract.~|~44 - Other~|~BC1F3C331782DFB265C24291C70BBCABFD95F754 76883~|~1~|~1~|~01/STR~|~This split is for resurfacing using rural STP funds. The entire lenght of SR 67 in this project in covered with this split.~|~05 - 4R Maintenance - Resurfacing~|~432F302468A033288C9EF6D242C1B62087B100F5 104773~|~1~|~1~|~01/NFP~|~District wide fence replacements.~|~44 - Other~|~894E837A46AB5C30021F3080B74911A4FFC0C542 110706~|~1~|~2~|~02/SAF~|~Centerline rumble strips on SR 117 in Allen County and SR 53 in Wyandot County. 100% state funds from the Safety Program (SAC 4BC7) until the cap is reached then 100% state funds from the District Preservation Program (SAC 4PS7).~|~21 - Safety~|~0DBE3D10A25D6A365CCB28BB3DC6F3663B2CC60E 110706~|~1~|~1~|~01/STR~|~All resurfacing work in this plan split using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~5861E9F84C02A9FF49D6230ECA24308D4C9BC628 103811~|~1~|~1~|~01/S>2~|~Replace structurally deficient bridge in the City of Kettering.~|~10 - Bridge Replacement~|~EA63FFF25A195CE42BCE8FF2ABA205AD793EDCA5 101572~|~1~|~1~|~01/NFP~|~See linked culverts.~|~04 - Reconstruction - No Added Capacity~|~864C2606978D749936FAADD02A0F9A64537EF377 101572~|~1~|~2~|~02/NFP~|~Minor work to structure with 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~364A8970A5C387415E8C782BFACE0B99576501F3 85297~|~1~|~1~|~01/SAF~|~80/20 funding split using federal HSIP funds~|~21 - Safety~|~E248F52DFC17B52AA396FA61788406B72820DDB7 93080~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 64.20. 100% State funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~95E8A49F674AC934D15278C7CAB630517698F8B2 90215~|~1~|~1~|~01/S<2~|~Plan Split for Federal/Local Split for GH Drive Extension~|~01 - New Construction~|~AB5D767DE30976689601875942C3032B0052DB49 93431~|~1~|~1~|~01/NHS~|~Priority System preventive maintenance on JEF-7-19.21 to 22.97; includes thin hot mix asphalt, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~644054098A446B918F033268DC816ECE2805A029 123538~|~1~|~1~|~01/S>2~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~AAC19CC57B8429D778D58A24A012381B55B2B190 123538~|~1~|~2~|~02/STR~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~C0FA50E3EEC856E19D643A428B0CF2556FD2D4C8 117948~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ eligible multi-purpose trail work.~|~~|~C84DEB55D8DE29EEA9707BFA924AE7AB5518C5A7 93686~|~1~|~1~|~01/S>2~|~Bridge repair of sfn# 7600682, STA-SR172-6.72 over SR-21.~|~13 - Bridge Rehabilitation~|~EE2E97E1FF650FB58D360CAE9D24D56DBC2EDDFD 96811~|~1~|~1~|~01/NFP~|~District 10 two-year mowing project for CY 2014-15 along Interstates and Interstate look-a-likes district wide. Funded 100% state.~|~44 - Other~|~2150C39EC837DDDA5870B419D555BA674D2085D2 124367~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~B6BEC05C5D13644AD3D2FF32E5029959A991BD54 105880~|~1~|~1~|~01/STR~|~Land & Buildings - LBM7 (100% State) - Construction of solid driveway in front of remote garage buildings~|~44 - Other~|~5A6D7440C5463B64D0D7A8484D5A1D072D6EC88E 124538~|~1~|~1~|~01/S5K~|~Resurfacing STP 5,000 - 49,999~|~05 - 4R Maintenance - Resurfacing~|~F19B233139CBE8E8F8BAB78199DC3DA6D43E8173 124538~|~1~|~2~|~02/STR~|~Resurfacing rural ~|~05 - 4R Maintenance - Resurfacing~|~14505C16838EFFECEED2162336829472E70BF4AF 124538~|~1~|~3~|~03/NFA~|~Resurfacing Not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~4043C3D4CF73DD689B8D1264589947E8BF9E1F80 113266~|~1~|~1~|~01/SAF~|~Traffic signal reconstruction.~|~21 - Safety~|~993769394AF5F4C4AF6A659AAB6DB3921682D2DC 104494~|~1~|~1~|~01/NFA~|~TR76 (Krause)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FA2B698FAF22663B0E180EEEC702AF7144941F3B 113078~|~1~|~1~|~01/NFP~|~Replace Culvert~|~17 - Construction Engineering~|~692DDF8B4075FF3FB843D075816EBED2F2A8F9C8 115355~|~1~|~2~|~02/IMS~|~For insurance purposes, this plan split pertains ONLY to the previous gouges and scrapes that existed on the beam flange of the HAM-71-0675 bridge prior to this most recent damage.~|~13 - Bridge Rehabilitation~|~BF46DF12F76CCAE77C6BEDAF61E21420FDC5B9ED 115355~|~1~|~1~|~01/IMS~|~All work related to the repair of bridge HAM-71-0731 and the most recent damage of the HAM-71-0675. HAM-71-0675 damage that pre-existed the most recent hit is in a separate plan split for insurance purposes. ~|~13 - Bridge Rehabilitation~|~727A7190964B2C2CDFEFD4EAE871FE6C39DB91E9 97344~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~16D77FAAFB924FE42B6D7C105E996A21464E7BEC 93609~|~1~|~1~|~01/SAE~|~100% federal funding for Safe Routes to School improvements.~|~44 - Other~|~3A3283669093CE49AB6D0CFC29A13AB5A5330346 101937~|~1~|~1~|~01/S<2~|~Plan split for Other Federal Hwy - Minor Aertial~|~13 - Bridge Rehabilitation~|~E8433875E107AA069E51FB1F7ACB1D25FAB06A54 89419~|~1~|~1~|~01/STR~|~FY2013 to FY2015 Loop Detector Maintenance and Electrical Repair contract~|~44 - Other~|~7AC2FD37D9586EF55A47FA82DB710257614A5E88 111214~|~1~|~1~|~01/NFA~|~Bridge rehab Rehabilitate an existing weathering steel fracture-critical truss on Palmer Road by removing all of th? existing superstrncture, widening the abutments & pier & placing a prestressed reinforced concrete beam deck. The project includes associated roadway approach reconstruction.~|~13 - Bridge Rehabilitation~|~8A178DE2318FC11B3FCE1269BE337F404856D8EA 102381~|~1~|~1~|~01/NHS~|~SCI 52R WB 19.01-19.07SCI 52F 0.00-1.6780/20 Federal/State~|~05 - 4R Maintenance - Resurfacing~|~74166286D987287112D036F1B136E545EDA6A5FB 102381~|~1~|~2~|~02/NHS~|~SCI 52R WB 19.07-19.31SCI 52D 0.00-1.46SCI 52F 1.67-2.1780/20 Federal/Local~|~05 - 4R Maintenance - Resurfacing~|~C11C665A67FC8445672361763D231DB32ABDD891 102381~|~1~|~3~|~03/NHS~|~100% Local for curb ramps and full depth.~|~05 - 4R Maintenance - Resurfacing~|~61A517CCF4E3331AF07E72BF78A163B4201E286D 112587~|~1~|~1~|~01/IMS~|~basic plan split prior to routes being selected~|~05 - 4R Maintenance - Resurfacing~|~F2436D8AE50DA493CF15DBA2CCCC0B34F9C8C8A4 114370~|~1~|~1~|~01/SAF~|~All the work in this project is in this plan split.~|~21 - Safety~|~DC37941BF49DEEAD2E6117442739F763CA62EDF4 123935~|~1~|~2~|~02/S5K~|~Plan split for slide repair work at SLM 4.41, 4.63 & 4.76 on SR-19 in Sandusky County~|~04 - Reconstruction - No Added Capacity~|~783BF6252B952D4D94FCEDEA4E412ACA6B210413 123935~|~1~|~1~|~01/STR~|~Plan split for slide repair work at SLM 2.50 on SR-19 in Sandusky County~|~04 - Reconstruction - No Added Capacity~|~03A466D772AF223D2B2A4E98932F3A6A419021C7 123935~|~1~|~3~|~03/STR~|~Plan split for resurfacing SR-19 (rural sections)~|~05 - 4R Maintenance - Resurfacing~|~582392C4997E249DC2E7269C22F5ECCFC40754CF 123935~|~1~|~4~|~04/STR~|~Plan split for resurfacing SR-19 (52~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8AF312E2C8C9EBAA4CD317F23827D9DBB9FC192A 119108~|~1~|~2~|~02/S>2/MACE~|~Resurfacing, urban paving in the city of Macedonia.~|~05 - 4R Maintenance - Resurfacing~|~7997D8E43FD01041420887E2934E52FC12BC6824 119108~|~1~|~4~|~04/S>2/NORT~|~Drainage repairs/upgrades in the Village of Northfield.~|~04 - Reconstruction - No Added Capacity~|~7AC226B02FEDB2E8DF24EE578CAA02953A8D75C2 119108~|~1~|~3~|~03/S>2/MACE~|~Full and partial depth pavement repairs in the City of Macedonia.~|~04 - Reconstruction - No Added Capacity~|~10D274F43D075B8C68F2D9C0841110851AB1C8EB 117613~|~1~|~1~|~01/BRF~|~Superstructure replace~|~13 - Bridge Rehabilitation~|~5CB72291060A891A1F19F0F79B583BEC088D30D3 115706~|~1~|~1~|~01/NFP~|~Loop detector maintenance.~|~~|~27B8E5DD49CFF03029FD6BB4114F65CE790AF863 100657~|~1~|~2~|~02/S<2~|~This plan split is for the BEL 40 28.17 location.~|~21 - Safety~|~AD9E62597DE5DDFA9590FF65723D9E78E4AE0E12 100657~|~1~|~1~|~01/NHS~|~This plan split is for the COL 9 13.06.~|~21 - Safety~|~5ED041CC92AC0755F93A5BDB369EA7971E4B25EA 100657~|~1~|~3~|~03/STR~|~This plan split is for the COL 7 22.25, COL 62 4.86 and the COL 14 16.80 locations.~|~21 - Safety~|~36C20AD983B57FAEF98C673F78EA373029361BA5 113986~|~1~|~1~|~01/IMS~|~FRA 270 from 37.00 TO 40.50~|~05 - 4R Maintenance - Resurfacing~|~1C82B02454BC8F41CC67E9C34164EC94C98CCB27 113986~|~1~|~2~|~02/IMS~|~Item associated with SFN 2512076 - FRA-16-7.98 - Ramp bridge carrying Broad St WB to 270 SB~|~47 - Bridge Preventive Maintenance~|~E123C457C4C970AE648112EFEB9A5C2264CEC34F 115838~|~1~|~1~|~01/MPO~|~Plan split for federally eligible portion of Construction/CE~|~04 - Reconstruction - No Added Capacity~|~745247EB0522DB04C013575EB3C38EBC93A8F8A8 106992~|~1~|~1~|~01/STR~|~GSMP slide repair.~|~~|~D54237CABE14FD5219102F57381690A95609DB5E 125551~|~1~|~1~|~01/BRO~|~Encase piles with structural repairs~|~13 - Bridge Rehabilitation~|~8B42B2011C5602789882C3EF7C1CD4D5DBD3501C 113251~|~1~|~1~|~01/STR~|~Culvert replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E82115B4EBAC056313C5868ACDEA1D89CE206BFF 100140~|~1~|~1~|~01/NFP~|~Plan split for all work at 100% state~|~17 - Construction Engineering~|~A1341A128B1A20BDC91604A0FA335B5A8F6C2A57 112975~|~1~|~1~|~01/STR~|~Replace bridge WAR-350-0873 over Todd Fork~|~10 - Bridge Replacement~|~5B2B8365F089FFB3BFDD27E2F5EC62DAC955A0CA 96646~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~B28C019D667B96C200F7AD87B64F8010DF4992CE 91044~|~1~|~1~|~01/MPO~|~Reconstruct left lane~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~13D70621280B570D43F3555048856F6E9B54698A 105967~|~1~|~1~|~01/IMS~|~Various culverts under IR70 for repair in Preble County from state line to Preble/Montgomery County line.~|~04 - Reconstruction - No Added Capacity~|~E6943B9B93145FF05D539DA73915846FC6EA5976 113550~|~1~|~1~|~01/IMS~|~Split for bridge painting work~|~47 - Bridge Preventive Maintenance~|~C8EB00DC7AA6E3B7B3D23AC5092C3B5FA04A9645 99734~|~1~|~1~|~01/ENH~|~Construct Ped/Bike Trail in Village of Syracuse. 95% Federal and 5% Local funds.~|~28 - Facilities for Pedestrians & Bicycles~|~A2541C61723059BE689D2ADEB3A2EC8BCF787BDF 107346~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~A4C989E077A96EB866EAFA16FD07A3AED6829CB0 97594~|~1~|~1~|~01/IMS~|~LUC-475 from SLM 9.63 to SLM 14.55~|~05 - 4R Maintenance - Resurfacing~|~4B3EC261503F36E61E62555CD9BA1B34A45055FC 97594~|~1~|~2~|~02/IMS~|~Secor Rd bridge~|~13 - Bridge Rehabilitation~|~1A963C6B73CB4151449F132D121DD0D22F7E9931 97594~|~2~|~3~|~03/IMS~|~Median inlets on I-280~|~04 - Reconstruction - No Added Capacity~|~D9A040C6200EB5551E4F0D8CB1B11FCEDE2B010F 92425~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~E1F29F3DE3E7D019BC4A58DB5D21D7108E39DC60 86634~|~1~|~1~|~01/NFP~|~District Preservation Program funds SAC 4PS7. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~40D4434275430CD3F0B2CC9B66427B7BBA6DC386 97014~|~1~|~1~|~01/NFP~|~Guardrail maintenance project~|~44 - Other~|~7718397D536AEACD7EE0365EF2B98D93E432B647 101240~|~1~|~1~|~01/STR~|~Resurfacing (all STP Rural).~|~05 - 4R Maintenance - Resurfacing~|~ACDB1ACACF90129CD5C34EE441CB65B4B63A4DCB 109100~|~1~|~1~|~01/STR~|~All work is in this plan split. The structure meets the state but not the federal definition of a bridge. District Preservation Program funds.~|~04 - Reconstruction - No Added Capacity~|~CFD1A6732D01D3D5F60671A6BDD48B27FE9045CA 122940~|~1~|~1~|~01/NHS~|~Emergency bridge hit repair on Reed Rd over US 30~|~13 - Bridge Rehabilitation~|~3302BFEE44442D1B97DE5FF79807945407128400 117936~|~1~|~1~|~01/NFP~|~Crack sealing.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8575BF91DDFF4B663C4DF02330C8A47FA74A68E9 100430~|~1~|~1~|~01/MPO~|~Mill and fill on Vermilion Rd from Liberty Ave to Brownhelm Station Rd~|~05 - 4R Maintenance - Resurfacing~|~52BE30488E18DAAAF50E01B1AE3C6159CBF7DC73 92607~|~1~|~1~|~01/STR~|~Smooth seal SR 502 SLM 0.00 to 8.81 in Darke County.~|~05 - 4R Maintenance - Resurfacing~|~5D1DC3C7E563AE6AEBF95CF70F82FC380FEBC108 95671~|~1~|~1~|~01/MPO~|~Bike Path along Sylvania-Metamora Rd~|~01 - New Construction~|~0D56BA0C7B6D1B8AA9B0C5962756C04A84B9E24B 105442~|~1~|~1~|~01/STR~|~All items of work associated with the rehabilitation of the existing bridge over the Big Darby Creek. Work to include pavement work, guardrail work and other miscellaneous work needed to adjust the profile due to the new bridge deck.~|~13 - Bridge Rehabilitation~|~3F4FCD8F121A4F8A7B11E91DA83CC0C3FD8DC829 96909~|~1~|~1~|~01/BRF/LOUI~|~Superstructure replacement, repair and/or modification of abutments, and new railing of structure over the Nimishillen Creek, City of Louisville, Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~B82E3483C80F3902AA7FD776A528D6490BE9A3B0 113711~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~D1AF3F7EFCB08648833C29D4ACA50ABC98D84692 85245~|~1~|~2~|~02/S>2~|~Superstructure replacement/widening of MAH-224-13.75 structure over SR-11.~|~13 - Bridge Rehabilitation~|~73808334CCA7AB250E45C4A2AAB02A3B1D9BDB0C 85245~|~1~|~1~|~01/SAF~|~Intersection improvement includes adding lanes, from Fairground to Summit~|~04 - Reconstruction - No Added Capacity~|~E3A17ADD76EAFD83D103E0A3C780E3932474E9CE 97579~|~1~|~1~|~01/S<2~|~Pavement planing and resufacing of US 40 within the City of Englewood.~|~05 - 4R Maintenance - Resurfacing~|~C88450BE8D2188A159099898330B08A537D6868D 118696~|~1~|~1~|~01/NFA~|~Plan split for bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~264E03FE990CD3B52EF4AB91AB50156D5A29E361 124890~|~1~|~2~|~02/SAF~|~Safe Routes to School funded sidewalk work on Foraker St. and Plainfield Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~DC04D5D5A0BAF94323A8417F6FD60C2AF83290B3 124890~|~1~|~1~|~01/STR~|~All TAP funded sidewalk work along Townline Street. ~|~28 - Facilities for Pedestrians & Bicycles~|~11E4324D64163A930CA05FEEE72830F4183060EC 109331~|~1~|~1~|~01/NHS~|~Rehabilitate existing structure BEL-7-1830 (SFN 0700487) by concrete patching, sealing the joints between precast sections and installing structural liner.~|~13 - Bridge Rehabilitation~|~2C03B7C3EF8EEBF23A2FF7AD14BD47095A5A86BF 126696~|~1~|~1~|~01/STR~|~STP Rural Bridge plan split.~|~10 - Bridge Replacement~|~11F144DA16367DFB2950CCF86F572B0D47953E80 102800~|~1~|~1~|~01/STR~|~Resurfacing various STP Rural routes using asphalt~|~05 - 4R Maintenance - Resurfacing~|~71988001E35E738A1BDDCB7606966B02AA8AA11C 102800~|~1~|~2~|~02/S<2~|~Resurfacing various STP < 200k routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~23911DDFD8416B119B41EE98057AD97E2E6719AA 104693~|~1~|~1~|~01/SAF~|~Pavement and restriping on NHS route in the Village of Bethel.~|~21 - Safety~|~07E4F4AD015B7AA3BC4CB57DAA7F07FD6C38DF91 104693~|~1~|~2~|~02/SAF~|~Sidewalk and crossing on NHS route in the Village of Bethel.~|~21 - Safety~|~02CC9AE122B6B0346B6869CFF3409FE8B8351928 106591~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Licking County Engineer Project to replace bridge Lic-CR2-9.38 (SFN 4534735)~|~10 - Bridge Replacement~|~84A267B1CE1A7837E00E89B06F9AE967BB95C094 125615~|~1~|~1~|~01/NFA/COSH~|~Replacement of the existing structure (SFN 1631322) on Township Road 25 in Coshocton County.~|~10 - Bridge Replacement~|~B234C6C413EE91F5A09F9FFB04F3AB8110B04D47 117397~|~1~|~1~|~01/STR~|~Plan split for purchasing of beams~|~13 - Bridge Rehabilitation~|~25ABC9B2BED7DC9206092BE8B202820BF58FB717 101688~|~1~|~1~|~01/STR~|~Landslide Repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7F9F4A184868C580D7427053DC47FF49EA817158 92980~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 541-00.00 to 08.89; 2) Cos-SR 541-31.59 to 34.62;~|~05 - 4R Maintenance - Resurfacing~|~AB021A5C556A054977BD983066D58DB6E56DAC37 92980~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on 1) Cos-541-3335 and 2) Gue-541-0158~|~13 - Bridge Rehabilitation~|~55E6E7D40348D33D65A94F286B7B5A8F63D8A0F3 83095~|~1~|~1~|~01/MPO~|~mill and fill~|~05 - 4R Maintenance - Resurfacing~|~891E942262A17C7C0BE2BA55711988E737D391F6 83095~|~2~|~2~|~02/MPO~|~This plan split was added for 100% items (removal of encroachments)~|~05 - 4R Maintenance - Resurfacing~|~E870FA0A3FBE8C8B056DEFA139C6DF5E4A1FBBBE 119667~|~1~|~1~|~01/NHS~|~CRA US 0030 11.99~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~16115BDD5C0D45AF84DBB54FBEA9E58ABB432A3E 119667~|~1~|~2~|~02/STR~|~Culvert Invert Field Paving-~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D06D6C6A48A4D98448B47017E0917D29EDB52CD 111097~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~6875CC856500A667C4A61582FBA938CDBE5CCB3E 105050~|~1~|~1~|~01/NFP~|~Task Order PID for construction inspection services - 4PF7 (60% Federal) / 4PS7 (40% State).~|~17 - Construction Engineering~|~F439B5F61D5B787935351758327A076B120D242D 94515~|~1~|~1~|~01/NFP~|~Road and parking lots in various Toledo Area parks.~|~05 - 4R Maintenance - Resurfacing~|~3F66A30A293120288E67D8283B5E762AA3B837A8 106996~|~1~|~1~|~01/STR~|~GSMP mine subsidence pavement repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~99DBA455A405EAB979AEE25654EDD94100093887 108073~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridge.~|~13 - Bridge Rehabilitation~|~C354C4F4771C57B550A2A20B157331B40B1285D6 117196~|~1~|~1~|~01/CMQ~|~Plan split using MPO CMAQ funds for intersection/signal upgrade work at 2 intersections along Ridge Rd in Wickliffe. ~|~21 - Safety~|~B471EEA15A7AA0F964EB1499D3ECEEFE6C0C91FF 105602~|~1~|~1~|~01/NFA~|~Minor widening and resurfacing on County Route~|~03 - Reconstruction - Added Capacity~|~B08A9A66767E6E14416BA7D1CA2E3F15C5D2E130 104913~|~1~|~1~|~01/NFA~|~Southwest Schools school bus replacement project~|~44 - Other~|~4A555A6CDD4FF4EDEB233793C9FB23AC3AB6877E 109861~|~1~|~1~|~01/STR~|~HIG Chip Seal FY25~|~05 - 4R Maintenance - Resurfacing~|~0165DB19702D686305D68149711C150E52057CC5 115174~|~1~|~1~|~01/BRF~|~Bridge replacement 80% Federal (4B87) and 20% Local (LNTP) - Federal could increase to 95% pending CBP credit.~|~10 - Bridge Replacement~|~7C16526010A5946E460610877924CC0509A2FD59 106631~|~1~|~1~|~01/BRF~|~Work to replace a bridge. 80% federal funds from the CEAO budget with a 20% match provided by Putnam County until the cap is reached. Funds needed after the cap is reached will be provided by Putnam County.~|~10 - Bridge Replacement~|~84CA44188B19F851D9AFB51109BB9B85F37659AB 113486~|~1~|~1~|~01/NHS~|~All work in this plan split using SAC 4BE7 for emergency replacement of the culvert that was washed out.~|~04 - Reconstruction - No Added Capacity~|~AE809C2F5C71F4A022B5CA49A65CD7D72BCBFE27 127082~|~1~|~1~|~01/NFP~|~Plan split for annual tree clearing within right of way utilizing 100% state maintenance funds~|~99 - State Preventative Maintenance~|~94DA690B696978E3D7FD6C74C94ABFDFE49B3AAC 113602~|~1~|~1~|~01/S>2~|~Extend LMST east to Eulston and provide a separated sidepath along SR-125 to Ranchvale (Alternatives A4 and A5/A6)~|~28 - Facilities for Pedestrians & Bicycles~|~C4BB5C2205A38CD054E137CD730F66D0C78B8459 113602~|~1~|~2~|~02/NFP~|~Plan split for Duke Gas improvements being performed by the roadway contractor but funded by Duke Energy.~|~43 - Utilities~|~A75ECF6E75ED5DBDFA1CCD9804BE8A2494E71B03 113713~|~1~|~1~|~01/SAF~|~Install a new sidewalk along the west side of Pippin Road between Struble and Stout and improve the crossings at the intersections.~|~21 - Safety~|~9396D085EBEA099B88BAE4CAEF5EB3415064C435 94329~|~1~|~2~|~02/STR~|~From SLM 12.03 to 17.49.~|~05 - 4R Maintenance - Resurfacing~|~B614A5085D393B85B75FE7DD6DAE638EDBBD3654 94329~|~1~|~1~|~01/S<2~|~From SLM 10.84 to SLM 12.03~|~05 - 4R Maintenance - Resurfacing~|~E4DCCFFB4E0DD2B795657E379505E822FEC3EA94 126945~|~1~|~1~|~01/SAF/HEBR~|~Pedestrian improvements along US 40 (W Main St) in the Village of Hebron.~|~21 - Safety~|~D711D485BB3DB0B18E56DF26F2AE5E1B6E745915 105519~|~1~|~1~|~01/STR~|~Rural portions of DEL-42 (13.27-19.17)~|~05 - 4R Maintenance - Resurfacing~|~CE91D4B04BAC7EE296AD0F789187DA9002A38D4F 105519~|~1~|~2~|~02/S>2~|~General system within the Columbus urban area (DEL-42-9.69-13.27)~|~05 - 4R Maintenance - Resurfacing~|~1FBDFC895E3E2D8A84CAEA8544CCFAB97571B4BA 105519~|~1~|~3~|~03/SAF~|~Install center line and edge line rumble stripes~|~21 - Safety~|~55A22E10808EFC7F6D89B56E9E4D568BBF76D17F 81552~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1805401; CUY-071-1795L~|~13 - Bridge Rehabilitation~|~7541EDF7CD87810F36F93B8A3F19BFE97D65DBC5 97143~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 513 7.04 (SFN 6104061) and NOB 564 0.26 (SFN 6104142). Not on the federal aid system funded 100% state.~|~10 - Bridge Replacement~|~F17558F526CEAC98E1C761DCE020CCF12496C2C4 100476~|~1~|~1~|~01/STR~|~Fine Graded Polymer Asphalt resurfacing of CAR-9~|~05 - 4R Maintenance - Resurfacing~|~276801C1EADE15AB9CC80566F6B89FF444BAE28E 105375~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~946F9C307D312B5414364BB653A4B68799ACE4B8 105375~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~65F000AAEF0D5216375611CEA4C5B090C6923FBD 105375~|~1~|~3~|~03/S5K~|~Resurfacing STP 5,000-49,000~|~05 - 4R Maintenance - Resurfacing~|~41E380748584CDEF543DE15B38B74B34BA11DC96 116756~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~D49B02176A2A9AB907439C6492672951EA00ED14 116756~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~BCA12C8F9DC3561158C28A05DF0251658589F8BE 91035~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split using federal MPO STP funds.~|~~|~BC37CA67FF8ECCF41D397858D6B9C9FDE266D52F 108515~|~1~|~1~|~01/NFA~|~Landslide Repair for ODNR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B4B9FA211260A1BA2730DD53C0D7AD2AA38840D6 82962~|~1~|~1~|~01/IMS~|~Preventative Maintenance on the Priority System for FY2014~|~99 - State Preventative Maintenance~|~9BA8370D81994CD5B82714097F87BC0172CEE2E8 113381~|~1~|~1~|~01/SAF~|~Pavement Marking project on various routes in Gallia County using HSIP funds. Funded 100% Federal.~|~21 - Safety~|~CF280E48870D65172462D2E04DA21CD698B21749 124425~|~1~|~1~|~01/SAF/LOR~|~Sidewalk~|~21 - Safety~|~696681BA8DA1396CC972A8E74C10EC0E7D210594 103851~|~1~|~1~|~01/ENH~|~Construction of sidewalks on Fairfield Avenue from approximately Woodland to Bittersweet; and approximately 500' on Metz Road; 95% federal/5% local funding.~|~28 - Facilities for Pedestrians & Bicycles~|~2F457AFF3AB4019C411877DCE8D2B8F677F0FF21 95833~|~1~|~1~|~01/IMS~|~Perform abument patching, pier patching, and deck edge repair~|~13 - Bridge Rehabilitation~|~7C13223EA6254BFF683FDAE6890B3CEE1C30C73E 95833~|~1~|~2~|~02/STR~|~Perfomr abutment patching, pier patching, backwall patching and deck edge repair on various bridges.~|~13 - Bridge Rehabilitation~|~A98552F14D2DA8C97D55B7DF632F30B5C248892A 95833~|~1~|~3~|~03/NHS~|~Perfomr abutment patching, pier patching, backwall patching and deck edge repair on various bridges.~|~13 - Bridge Rehabilitation~|~BECB3F4C0CE66A04DFC790D761446ACB3FFDB4F8 95833~|~1~|~4~|~04/S<2~|~Perform abutment patching pier patching and deck edge repair.~|~13 - Bridge Rehabilitation~|~BB2D44E4A1A2C0C53620CC98CE25CF1577845F95 95833~|~1~|~5~|~05/S<2~|~Perform abutment patching pier patching an deck edge repair. This bridge is under 20".~|~13 - Bridge Rehabilitation~|~E6517C251A5CC66528024DAD2EC5ED52E79EB04A 107601~|~1~|~1~|~01/STR~|~Plan split for resurfacing on rural sections including WAR-350, CLI-350, and CLI-132~|~05 - 4R Maintenance - Resurfacing~|~2C28051D591F9DCE5826EA8BDCF17F1F91187351 126089~|~1~|~1~|~01/BRO~|~Plan split for all work associated with HEN-6-1094R bridge~|~47 - Bridge Preventive Maintenance~|~BA8C6CD5A2C08F049D113CF92A43F276275B5414 104817~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~A39694BFF23DDDBA6424E5D77D1018290774DAF2 104817~|~1~|~3~|~03/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~E4D2954391CCD0AA9025A1583A493597ED19043B 104817~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~BD757D0A8DD9BE699D35F85FD5944B1E7CF585BF 104817~|~1~|~4~|~04/S<2~|~Construction Inspection.~|~17 - Construction Engineering~|~C1D3D61E73F07A10120482922E2E4805CC97AE32 124169~|~1~|~1~|~01/NHS~|~Noisewall installation~|~20 - Environmental Only~|~FDE9A79C6BE8E87552A5EEE662967A38A33567CF 124169~|~1~|~2~|~02/ENH~|~Noise Wall North and South Side of US 30~|~~|~906EF7AA610CA667BDA863F3B9E8B54FA894328D 110590~|~1~|~1~|~01/BRO~|~All the work to replace the bridge. District federal and state funds.~|~10 - Bridge Replacement~|~FA219DA4B3032C43345CB3885B68BDB976CF5B03 105429~|~1~|~1~|~01/IMS~|~Plan Split for bridges over I-70~|~10 - Bridge Replacement~|~182E0429CDB7DF18626B3B2597E5A805D415A94A 93165~|~1~|~1~|~01/STR~|~General system resurfacing of MRW-95: 0-8.12 and MRW-95D: 0-1.15~|~05 - 4R Maintenance - Resurfacing~|~FA6DB4E8F12C50F22AEC6B62A1E0B8FA257A52D9 98318~|~1~|~1~|~01/STR~|~Culvert Replacement - Emergency Type C~|~44 - Other~|~C2A99924503AA966999B24001297DE2BAACAA403 122813~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAC 4CD7). Construction phase cap is $79,689.09 and requires a 20% match (TRC)~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~61F6102464E905E035C7180E44A77D888A666047 108725~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-034~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3BB1B07E2DEB44CEC6B8F4D9FFF8ADEC13C895A3 96348~|~1~|~1~|~01/SAE~|~100% federal pariticipation on SRTS eligible work items in South Euclid portion of the project.~|~17 - Construction Engineering~|~4CD7FC0F38D5DB3E246F8DFB0236ECE0C988FFE9 96348~|~1~|~2~|~02/SAE~|~100% federal participation on SRTS eligible work items in Lyndhurst portion of the project.~|~17 - Construction Engineering~|~DE5E00D3B5C4F59FAC5A9574837B653EB1579CB8 102710~|~1~|~1~|~01/NHS~|~This plan split is for mill and fill on NHS route.~|~05 - 4R Maintenance - Resurfacing~|~1F24C1D7B5A112E0BF64A6E83D1705777E3A4967 102710~|~1~|~2~|~02/NHS~|~City of Centerville requested the use of radar detection units be installed in lieu of using traffic loops to be 100% city funded at $14,508.10~|~05 - 4R Maintenance - Resurfacing~|~97A74D038C3B88934B6E436DD75AC9B51F8D8C25 101046~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~AFC5896950EF941ED80DBADF80882AC8DB1D90DB 101046~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~4CF8C5C1224CA846C62CE8E5FCE55B9028A115A4 101046~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6F9120F982022C77444A24BC1A414D50A16D1DFE 122205~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-A~|~~|~361A28655E2DA838F11B93F34AC2CE1AEBAA3147 95859~|~1~|~1~|~01/NFP~|~Culvert at SLM 7.86~|~44 - Other~|~14092BB6A16648DBC8BCD64D4CE840F0C6BBD929 98975~|~1~|~1~|~01/MPO~|~Installing 4,590 ft of sidewalk on the SOUTH side of North River Road from SR 46 west to Howland Multi-Purpose trail. Includes benches, plantings and trees.~|~~|~A940C1D11D92DFD05C5C582CDCCD924D044C42DF 87007~|~1~|~1~|~01/S>2/SCE~|~Resurfacing of County Route 66 between Orion Street to Wright Road, in Lake Township, Stark County, Ohio. Guardrail and signing where necessary.~|~05 - 4R Maintenance - Resurfacing~|~53FD80135A62EDD81F37918A5328B309B8EB1387 88918~|~1~|~1~|~01/BRO~|~Replace existing twin CMP pipes (COL-164-1561, SFN 1504088) with a four-sided concrete box or line existing pipes with liner.~|~10 - Bridge Replacement~|~9E0919584C831E8A2B66E4744174FE598039A62B 124646~|~1~|~1~|~01/IMS~|~Resurfacing/rehab.~|~04 - Reconstruction - No Added Capacity~|~454A7623EEA64AA73EA5D1F50D5AE424BCE6AE7B 97310~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~6381544E0275016E31E6E22AF05D3478092A2C3F 116652~|~1~|~1~|~01/NHS~|~Plan Split to program project. Update when scope of work is complete.~|~13 - Bridge Rehabilitation~|~5FB614E66EF07B831ECC2900C886936C0830312A 98263~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of Lic-SR 37-3..79; BR Eligible for Rehabilitation - Length 120'; SDFO(1); DSR 4; SR 86.8~|~13 - Bridge Rehabilitation~|~00116262BE1AACED887E59878915A1C9D167DF29 100874~|~1~|~1~|~01/NHS~|~BRO 32 0.10 culvert liner~|~04 - Reconstruction - No Added Capacity~|~35C20006F22DD5028159EAB31D759238F0EAE128 103889~|~1~|~1~|~01/NFA~|~The TID will reconstruct 2,693 foot of road along Concorde Drive to a two -lane road with 12 foot lanes and two to three foot shoulders between US40 and the building.~|~01 - New Construction~|~E4ECC436087527ECDA12A5C019EC8128F185D0CE 118864~|~1~|~1~|~01/STR~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~F27FB4B737E45FCB6D72A00175395E1E6B614BF2 125650~|~1~|~1~|~01/STR~|~plan split for the rural locations~|~05 - 4R Maintenance - Resurfacing~|~8787F1AEF9753E97889D9EEA2B258A8CAE8B5D17 126230~|~1~|~1~|~01/SAF~|~Install RCUT.~|~21 - Safety~|~8B32883B5526D6D3529E1CE9E100D0A8A80E8F47 123756~|~1~|~1~|~01/IMS~|~Interstate Plan split~|~05 - 4R Maintenance - Resurfacing~|~0B22BBB35BEDE3F14E4586B64C59298251EE96A8 101074~|~1~|~1~|~01/NFP~|~Pavement markings~|~21 - Safety~|~2269BC442AD8F12680FA9A5280CB9250EF337E39 114903~|~1~|~1~|~01/STR~|~WIL-107~|~05 - 4R Maintenance - Resurfacing~|~C04A024AE4E09130A0CCC4E034BAD936117D21D7 105586~|~1~|~1~|~01/NFA~|~The Village will construct a center turn lane along Main Street (ST RT66) by widening from the south corporate limit to 350' north of Industrial Drive.~|~01 - New Construction~|~3AC73695C2FA1C21B6E703658D3007F247C99EC5 109890~|~1~|~1~|~01/NHS~|~SFN 3500241 approach slab.~|~13 - Bridge Rehabilitation~|~F103670D601F822005F84BDD1670AC023C278D23 99935~|~1~|~1~|~01/NFP~|~Tree cutting and pruning contract.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E26E357AAB009DAFB77210AB1ED1D7946D13E114 121151~|~1~|~1~|~01/NHS~|~All Work is within this split~|~05 - 4R Maintenance - Resurfacing~|~680FA685AC88F8A1820D95259F968241E4AFDA8C 100651~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 50 1595 L & R (SFN 0501573 L, 0501603 R) and ATH 50 3491 L & R (SFN 0502073 L, 0502103 R). NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~CF1D85B3538DB6982A42B6FA66EFAFE7A71FFAD5 122048~|~1~|~1~|~01/IMS~|~Plan split represents all work related to roadway construction.~|~04 - Reconstruction - No Added Capacity~|~5F4EA9360646EBE596E6DDFD16C97464EDA53C46 122048~|~1~|~3~|~03/IMS~|~This spit is for bridge removal~|~40 - Special Bridge~|~ECE4BA183F88CA5172A4144A4D8BA85E40C000F4 122048~|~1~|~2~|~02/IMS~|~This Plan split represents bridge replacement work.~|~10 - Bridge Replacement~|~F70F11CE02B1D53A21273E0102777F07745BD6C5 122972~|~1~|~1~|~01/SAF~|~Corridor safety improvements~|~~|~6743848EAD4F8E0DE10B1186CF6AED8E66CED08B 106111~|~1~|~1~|~01/STR~|~DSR BEL-008~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4DFB79DE9523635004CE2AAC59311A0BC26444DA 116560~|~1~|~1~|~01/IMS~|~Plan Split for bridge work~|~13 - Bridge Rehabilitation~|~D2F450550610F5BCFC53150FB11F7BB4BCC6D4E9 105141~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' structure.~|~~|~CB2071973A52DC662E0AF6A59D24BE646ACF6B1C 105141~|~1~|~1~|~01/NHS~|~Resurfacing of ATB-SR 11 from 8.05 to 13.94.~|~~|~D99DCB6923FAC84E57D60575807B86820E303959 105141~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span.~|~~|~88B54E6E7DEAC0C7A37FCB35AF84E343E8FE18AD 124117~|~1~|~1~|~01/NHS~|~Pavement Widening~|~03 - Reconstruction - Added Capacity~|~625A5D950B0B5E329EAE8A0DA5F533DBE6FF6C06 24998~|~1~|~1~|~01/IMS~|~Planing and resurfacing of existing pavement and widening u-turns on Interstate 75 from 0.42 mile North of junction CR 15 (SLM 14.15) to 0.95 mile North of Piqua North Corporation Limit (SLM 18.90).~|~05 - 4R Maintenance - Resurfacing~|~3244D97E9DC2E21AE26501D44A4A1C9098B3F849 97705~|~1~|~2~|~02/ENH~|~Install Sidewalk on East side of Prospect Street from Skeels St to Ravenna South Corp Limit.~|~21 - Safety~|~90687076D4B02BF690F91EEA04BF4C943591221F 97705~|~1~|~1~|~01/MPO~|~Resurfacing CR 74 from SR 5/44 to Ravenna South Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~DCAC011396CBCF720145C45C8A1707DF9191ADBA 109451~|~1~|~1~|~01/CMQ~|~Construct a roundabout at the intersection.~|~21 - Safety~|~5BCBA0FF0D26103505E61439D9788CB156E3718E 101264~|~1~|~2~|~02/NHS~|~Pavement full and partial depth repairs and curb ramps along SR 18 in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~5ED03BCA6E86B000D3856791069CD6FB46A62FD4 101264~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing SUM SR 18 from 4.91 to 6.56 and 7.98 to 9.88, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~BC2870424CB29BC4F5B47C98D0EE4A9F88EC3F43 104789~|~1~|~1~|~01/ENH/NEWA~|~"01/ENH/OT/NEWA" - City of Newark project utilizing LCATS funding for construction of multi-use path.~|~28 - Facilities for Pedestrians & Bicycles~|~E7FFBDD11564BC573CE11C1F152F66C523161A2C 104789~|~2~|~2~|~02/S50/NWRK~|~Replacement of LIC CR 803 1.116 (SFN 4561430) which carries Granville Road over Log Pond Run Diversion Channel.~|~10 - Bridge Replacement~|~08B42F86362C263A29A3E40789E19D412AD070A0 116678~|~1~|~1~|~01/STR~|~All work is in this plan split. ~|~05 - 4R Maintenance - Resurfacing~|~FA3B0A33640F64BFA968CC97CAEFE9E4C011A24D 109591~|~1~|~1~|~01/MPO~|~Construction of a section of the Great Miami River Trail from the City of Monroe Bicentennial Commons Park to the northern corp. limit.~|~28 - Facilities for Pedestrians & Bicycles~|~08313DB4516E729DE89AB7F023B978F687D6C6C0 119213~|~1~|~1~|~01/IMS~|~Highway Lighting.~|~21 - Safety~|~1ABD27FF87683F8B05832A10DBF3FBE38E764F5A 119213~|~1~|~2~|~02/SAF~|~Partial interchange lighting at RIC 71/39 ~|~21 - Safety~|~72055237F48C9CD93E2554153E877F2A93422338 115861~|~1~|~1~|~01/NHS~|~Plan split for all culvert locations.~|~~|~1C5519D34EFE2983DA8B16BBE4FECA6A1A924A90 96072~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " plan Split for construction of a loader/equipment storage building at the proposed Crooksville OP in Perry County~|~44 - Other~|~DDFCA02FBEC6F4187C091D89D2221DDBEDE18C4C 95711~|~1~|~1~|~01/STR~|~Perform a shoulder stabilization and overlay. With the berm stabilization, the pavement width will be widened to 24' and stiriped for 11' lane widths with a 1' pave berm and an 18" aggregate berm.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D5ACEBC9164EE976ECD7C9C9EEEDF74EC0A78247 99744~|~1~|~1~|~01/MPO~|~For work on the sidewalk and multi-use trail.~|~44 - Other~|~47713F4691D4E2B6AC3014B7BABEE0A1C610B395 99744~|~1~|~2~|~02/BRF~|~SFN 2561549, 100% City of Columbus costs~|~44 - Other~|~85DCA5F5D31BE4E21695A47ABB13F768A83EAACD 97646~|~1~|~1~|~01/BRF~|~SFN 8631239~|~10 - Bridge Replacement~|~E5EEB90073C53FF5A05A55374D41AF873C2068CF 99610~|~1~|~1~|~01/S50~|~Replace existing slab bridge BEL 40 2748 (SFN 0701807) with new structure~|~04 - Reconstruction - No Added Capacity~|~063E9019E55F26FA0EEEE9315ED1EBCBA14CA34E 103416~|~1~|~1~|~01/CMQ/BASH~|~Conventional intersection improvement at Plainfield Road with the EB SR-126 ramps, and conversion of the Plainfield Road intersections with Hunt Road and Peppermill Lane/Reed Hartman Highway to modern roundabouts.~|~21 - Safety~|~2E3E40D49C0B7A58ED92B14F6FFD000E57DFE800 103416~|~1~|~2~|~02/CMQ~|~Conversion of the existing intersection of Hunt Road with Kroger's main driveway to a modern roundabout. Split is not eligible for ODOT safety funds.~|~04 - Reconstruction - No Added Capacity~|~42AA18DC91246EBF34B45D583CE3DE0B988D4E14 115632~|~1~|~1~|~01/SAE/CCEO~|~Replacement of existing guardrail, and installation of new guardrail, on various county roads in Clinton County, OH.~|~21 - Safety~|~FCBE1F4CF3C37C529187B15C777459CA8E4C7420 83975~|~1~|~1~|~01/S>2~|~Rehab bridge over South Plum Run (not currently BR eligb-but close)2517078 FRA SR665 12.62 Intersect: Plum Run01/S>2/BR/~|~13 - Bridge Rehabilitation~|~4EAC9EE237CA0EFA139FB02DCE3F2AE908BEE641 113219~|~1~|~1~|~01/IMS~|~Plan split for reconstruction~|~03 - Reconstruction - Added Capacity~|~67695AF1A669105A6D7D00A3E388B631F1A08538 103060~|~1~|~1~|~01/NHS~|~Mill and fill of Colonel Glenn from Grange Hall Road to the eastern City of Beavercreek corp. limit including replacement of deteriorated curb, catch basins, and sidewalk. Installation of raised pavement markers, and upgrade of all curb ramps to be ADA compliant.~|~05 - 4R Maintenance - Resurfacing~|~E55313EE42656042CCF01BFF37287C9339B4554D 122828~|~1~|~1~|~01/MPO~|~Union Township EV projects 2026~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~CA48F0A92D2B65365CF480004DEC5320189B6715 93391~|~1~|~1~|~01/BRO~|~Plan Split for SFN 6739016 Parkman Road bridge over Eagle Creek~|~10 - Bridge Replacement~|~6778079C5D4CB50F8305A031C1B83788F32EC974 88745~|~1~|~1~|~01/STR~|~Fast dry pavement markers district wide.~|~21 - Safety~|~B27A3B724D06BDEDBB1C5656D75CE9D1E4DD7429 118572~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacement on various routes throughout Stark and Summit County.~|~21 - Safety~|~C0A69C969620A06143A94A9DFCC85C98DB9C1E4E 84627~|~1~|~2~|~02/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~1EA37874B4541A03677D0BE214E694F58B065DFB 84627~|~1~|~3~|~03/S>2~|~Fine graded polymer AC overlay on STA SR 297 from 0.00 to 0.66 and STA SR 627 Ramps C & D.~|~05 - 4R Maintenance - Resurfacing~|~44B82CBA41774B3A68A354AE6590FC61676D80F8 84627~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay on STA US 30 from 9.61 to 13.03. Sealing of SFN# 7607385, SFN# 7607369 and SFN# 7607393.~|~05 - 4R Maintenance - Resurfacing~|~DD303C97CE5CFE24E048A7FF2CF00C4B3CF48B52 97375~|~1~|~1~|~01/NHS~|~This PID is for payment to a developer for the Design- Build- Finance- Operate- Maintain (DBFOM) contract for the Portsmouth Bypass.~|~17 - Construction Engineering~|~8C00EB223892EC900FAE8B3AF9F8127BC143D407 97375~|~1~|~3~|~03/STR~|~SCI SR823 6.67-10.22 PortsByPass Brdgs added for $11,002,590.00. This includes the Cattle Crossing structure, Brdg SCI-234-0122, Brdg SCI-823-0837L. Brdg SCI-823-0837R, Brdg SCI-823-0917L, & Brdg SCI-823-0917R. 80/20/split ~|~17 - Construction Engineering~|~C3956C66645B4F929CF1491479AF0175E94776FD 97375~|~1~|~2~|~02/STR~|~SCI SR823 6.67-10.22 PortsByPass It is proposed to construct a new Bypass beginning @ US52 (SR823 SLM 0.00), north and terminate @ US23 (SR823 SLM 16.78).The project includes 5 new interchanges and several new bridges. Portsmouth Bypass was previously programmed under 3 PID's. Phase 1 was originally PID 19415 & now includes all 3 phases and originally began at SLM 6.81, Shumway Hollow Rd. and terminated at SLM 10.13 Lucasville-Minford Rd. Phase 2 was under 79977 and began at SLM 10.13 Lucasville-Minford Rd. and terminated at US23 SLM 16.78 and Phase 3 was under 77366 beginning at SLM 0.00, US52 and terminating at Shumway Hollow Rd. SLM 6.81. 80/20 split~|~17 - Construction Engineering~|~CEF2A3E7E407409238EB7C3EBE26B9198B41DD07 119298~|~1~|~1~|~01/STR~|~Resurfacing US 40 - Rural sections (SLM 6.780 to 6.869)~|~05 - 4R Maintenance - Resurfacing~|~18F27F1D809267D6AAE673818AECFFDE572DBFE7 119298~|~1~|~2~|~02/S5K~|~Resurfacing US 40 within the London Urban Area~|~05 - 4R Maintenance - Resurfacing~|~F5BD16742FF9FE536AB143658B482CD4D66548EF 119298~|~1~|~3~|~03/S5K~|~Resurfacing US 40 within the West Jefferson-Lake Darby Urban Area ~|~05 - 4R Maintenance - Resurfacing~|~96C8D8DF42216AE5139A01CFB452B7861572BCC9 105176~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route: CHP SR 235 SLM 9.58 to 11.19.~|~05 - 4R Maintenance - Resurfacing~|~8B1088825E8577EB5ADAE1BF4D0F5A7A1B308CEB 95765~|~1~|~2~|~02/STR~|~SFNs: 7202946, 7202997, 7203012, 7203055~|~13 - Bridge Rehabilitation~|~E2B6CD82739BDFBFB2FEDD4C46D4E9728F6FAA20 95765~|~1~|~1~|~01/STR~|~SAN-412 from 4.70 to 8.72 & SAN-590 from 0.00 to 6.55~|~05 - 4R Maintenance - Resurfacing~|~37E8483D96CD558DA555C6BF5A0AEC021CE4979D 100487~|~1~|~1~|~01/S<2~|~ROS 159 (0.42-0.97)~|~05 - 4R Maintenance - Resurfacing~|~79439F22874667529B7B6CB8B98CB55BE0D35DA7 100487~|~1~|~2~|~02/NHS~|~ROS 159 (0.97-1.14)~|~05 - 4R Maintenance - Resurfacing~|~6F6CAC10BC813D4FD4E02E675AB06C5CBD0A7C22 100487~|~1~|~3~|~03/S<2~|~ROS 159 (0.00-0.42) 20% local match.~|~05 - 4R Maintenance - Resurfacing~|~7CF98A41D3321F4164BCB933FDB4A22FDCDAE896 100487~|~1~|~4~|~04/NHS~|~ROS 159 (1.14-1.22)20% local match~|~05 - 4R Maintenance - Resurfacing~|~7D74E8F64E52D450DBF56911F5C0299135EA8090 100487~|~1~|~5~|~05/S<2~|~100% local for curb ramps and full depth repair.~|~05 - 4R Maintenance - Resurfacing~|~C33AF18F521D68D780F57FF4E5487D0157481502 100487~|~1~|~6~|~06/S<2~|~ROS 159 0.42 (SFN 7104189)Replace strip seal glands; remove/reapply epoxy paint on sidewalks and parapets; *Replace pressure relief joint with Armorless Preformed Joint Seal (compression seal) after extending rigid approach pavement.~|~05 - 4R Maintenance - Resurfacing~|~AE0CDF559E963C77D188106E8C889D8727B9B42F 100487~|~1~|~7~|~07/NFA~|~This is to resurface the ODNR Headquarters parking lot in Chillicothe at 345 Allen Avenue.~|~44 - Other~|~20C94EC41701F52553B1120121FB165C50C52A5A 100487~|~1~|~8~|~08/NHS~|~ROS 35 19.71 (SFN 7102070 & 7102046)~|~05 - 4R Maintenance - Resurfacing~|~E9A5B2DF1C0C7AD0FF6C9FDE1CE78DC17245040E 98638~|~1~|~1~|~01/STR~|~SFN 5403286, MER-219-1210 on Schrodor Ditch - replace deficient twin 72" reinforced concrete pipe (RCP) culvert.~|~04 - Reconstruction - No Added Capacity~|~BCF212B677B5BC8C6670CBC71F97CE1C7A82CCE4 118880~|~1~|~1~|~01/S5K~|~Resurfacing US 40~|~05 - 4R Maintenance - Resurfacing~|~72C68C0B52263508DBBA357716C2028A962B03C5 96100~|~1~|~2~|~02/NHS~|~ROS US 35 33.48~|~44 - Other~|~DE5742E7C7EA886F5C2712E78E3DE8B89CE76E76 96100~|~1~|~1~|~01/MPO~|~Plan split for Bridge approach slab jackingSFN 4404394LAW-7-6.90~|~44 - Other~|~DF7D19CE77099D58DFC81ECE59DDD4403F0103FC 95781~|~1~|~1~|~01/S<2/FCEO~|~"O1/S<2/OT/FCEO" - County Engineer?s Association Funding STP 4B77 (80% Federal) / LNTP (20% Local Match) ? CAP = $50,000.00 in Federal Funding requiring local match ? Upgrade of signs along CR 33A from the 08.19 mile marker (southern corp limit of the City of Lancaster) to the 11.13 mile marker, CR 63 (Horns Mill Road).~|~21 - Safety~|~AC3FC1039695C2207C100C7B70143CE9C07847FB 112019~|~1~|~1~|~01/SAF~|~Improvements to the existing street via roadway, drainage, pedestrian, and bicycle infrastructure additions or alterations. Traffic calming elements are also proposed.~|~03 - Reconstruction - Added Capacity~|~103E0A530BB9E8EF877CDFD6D82A19B62E4AED11 120095~|~1~|~1~|~01/STR~|~added plan split.~|~21 - Safety~|~4DEA8A5C771D8156BDAD4102F9E07346BFA77657 113992~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/OT/KCEO" - upgrade of pavement markings along various county routes in Knox County.~|~21 - Safety~|~A7DCFB2C5CB49999CAAF0D0187B1056222A02D69 120343~|~1~|~1~|~01/NFA~|~NEVI Round 2 77-B~|~63 - Electric Vehicles & Charging Infrastructure~|~7887F5268BBB576C8B298407C55D5B2DE7F61186 125550~|~1~|~1~|~01/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~8FE7B5AB6D32D9FEA3409BEB7A258BE70C074A25 124616~|~1~|~1~|~01/STR~|~Pavement Markings on various Huron County roads~|~21 - Safety~|~EF84E0D746969ED73CB89C11FA7E49CC74BD4691 124150~|~1~|~1~|~01/S5K~|~MRG-376-1.05 Emergency Landslide Project~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~77EB47BF8FE16FC750EBF13CC1012562923EFB03 99484~|~1~|~1~|~01/ENH~|~Construct bike/pedestrian trail connecting the Mahoning Valley Trail to Early Hill Park, in the City of Alliance, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~DFCD9943178F45DB0010996334949CED765FD531 125435~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 554 10.27, CFN 1833133.~|~04 - Reconstruction - No Added Capacity~|~2E9477DB85F8AC25E2A83C49DD4F354CD69ED6DD 91448~|~1~|~1~|~01/S>2~|~Bexley urban pavingFRA-16: 3.57-4.32~|~05 - 4R Maintenance - Resurfacing~|~31A59E1DDE58A887DFDE10F0B500334F668CAC29 96288~|~1~|~1~|~01/STR~|~Bridge ReplacementSR125 SFN 0103004 SLM 3.03~|~10 - Bridge Replacement~|~7EF678B10E9FE6BC9ED808CF5AD4F015AC5C5CC0 95216~|~1~|~1~|~01/S<2/ELiv~|~Plan split for mill and fill project in East Liverpool on Park Way, Walnut, 5th and 6th streets using Small Cities/Local funds 80/20.~|~05 - 4R Maintenance - Resurfacing~|~A5F76F83B9DA60CC4E8F22E9CD8DA5DC5C18C95B 113823~|~1~|~1~|~01/S>2~|~Split 1 for major rehab work~|~04 - Reconstruction - No Added Capacity~|~0100F82C14837752FA32DD38BB625A7FB486EB39 113823~|~1~|~3~|~03/IMS~|~Split for bridge repairs to the structure over IR-480. ~|~04 - Reconstruction - No Added Capacity~|~91043B24151FD8DB8A43C05043351AEB1C4F9951 113823~|~1~|~2~|~02/IMS~|~Split for modification to Ramp GE-1A~|~04 - Reconstruction - No Added Capacity~|~361480C9E514E38759EDB5D698A09133C42298B4 98617~|~1~|~1~|~01/STR~|~Resurfacing Mahoning Avenue (CR 18) near the turnpike interchange.~|~05 - 4R Maintenance - Resurfacing~|~89F309AD870424F87D6503187F40BF84F6602B7D 112852~|~1~|~1~|~01/S<2~|~UNI-245 (Ramp R) SLM-7.46-7.65 (Sta 3+17.91 - 13+36.43)~|~05 - 4R Maintenance - Resurfacing~|~75812F009D8BEEA525A43C057A19E61FA332074D 112852~|~1~|~2~|~02/NHS~|~UNI-33 SLM 8.72-12.60~|~05 - 4R Maintenance - Resurfacing~|~955760B54A06E97371A56FE7E4EADDAA63E651D2 112852~|~1~|~3~|~03/NHS~|~UNI-33 1218 L&R Bridge over US36~|~47 - Bridge Preventive Maintenance~|~01F0BFDB23D3F09746AB75848C959FFDCA41FF87 120389~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~3F81E58C136B516ABAE6FE76237140937FAA7A26 106080~|~1~|~1~|~01/S>2~|~Urban route within the City of Columbus: FRA-23-18.53-20.34~|~05 - 4R Maintenance - Resurfacing~|~9FCEEC407549965BB54F8EA3F922083E7941EBE0 106080~|~1~|~2~|~02/S>2~|~100% Columbus items~|~05 - 4R Maintenance - Resurfacing~|~729E933BAA20862B10B731A308762216EBBCC641 104158~|~1~|~1~|~01/NHS~|~Highway Lighting~|~44 - Other~|~C401A92AFCB8E77468D3CD815F92664BEFCA7DB7 104158~|~1~|~2~|~02/NHS~|~Lighting in North Ridgeville~|~44 - Other~|~F7A9E56415EC8EDB9040CE195B6D9E5D5A2204FF 93571~|~1~|~2~|~02/NHS~|~SFN 120577 CLASR00004**C 23.350 reface abutments using anodes, dec edge replacement using anodes, patch pier cap right forward Pier 2, encase pier columns to botton of pier caps, rebuild and/or patch wingwalls, seal deck edges, pier caps, reface abutments and wingwalls with epoxy-urethane sealer, remove asphalt wearing surface and replace asphalt wearing surface, waterproof entire deck, saw and seal expansion joints in asphalt pavement. SFN 1200038 & SFN 1200062 CLA-4-6.67 L&R replace the existing retainer clips, modifications to the parapets to accept the new retainer clips and installing a new seal with MOT.~|~13 - Bridge Rehabilitation~|~964537A736B5B91493921CF44AF4751CDF6F51AF 93571~|~1~|~1~|~01/STR~|~(SFN 1201468 CLA 41 0290 - encase piers) (SFN 5501563 MIA 55 1533 - repair anode abutments and encase piers) (SFN 5503876 MIA 201 0853 - repair anode abutments, anode edge, and encase pier) (SFN 5504449 MIA 589 0008 - repair anode abutments, anode edge, and encase pier) (SFN 7503334 SHE 589 0437- repair anode abutments, anode edge, and encase pier) (SFN 7500459 SHE 47 0561 - Encase pier and adode edges) (SFN 5503841 MIA 201 0611 Indian River Rebuild deck edge using anodes, reface abutments using anodes, and encase pier piling) SFN 5503817 MIA 201 0490 Honey Creek reface abutments using anodes, encase pier piling, and reface abutments using anodes) and SFN 5503515, MIA 185 0388.~|~13 - Bridge Rehabilitation~|~8B7DEC553977DD16126CD608A3674D28CC3B4173 93571~|~1~|~3~|~03/S>2~|~SFN 1206273 CLA-571-0125 on Honey Creek encase pier piling front and rear.~|~13 - Bridge Rehabilitation~|~188C6DFB4F17314024BACF40C0A4CE7CB6165538 105835~|~1~|~1~|~01/S>2~|~Culvert rehab on Lg. Urban route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5567ADA4193170C2751B1DFB8ACCA2BC013F1A48 105835~|~1~|~2~|~02/S>2~|~Culvert rehab on bridge size culverts in large urban route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~977BCBDD2BC72E6498624298ECAA9AADCC1DEF8B 105835~|~1~|~3~|~03/STR~|~Culvert repair on bridge size culverts on rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F7696F745651B7340ABBA35C37F164412635DE15 105835~|~1~|~4~|~04/SAF~|~We will be adding a slotted drain along SWARSR00048**C approx SLM 0.35-0.41.~|~21 - Safety~|~1EDDE5A1203EBCE949F1FE2895AD858389C61AF1 118234~|~1~|~1~|~01/SAF~|~Plan Split for Safety funding event~|~21 - Safety~|~D3A16E24CE6728967FB4881964D25E05ECBF7593 118234~|~1~|~2~|~02/NHS~|~Plan Split for Urban Paving~|~17 - Construction Engineering~|~1886EF4F103A36428A4E782DE3F8369A2335F652 118234~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded scope.~|~44 - Other~|~BE1943822CB8C174F1D212B8DAD3DE1B6563C14A 108112~|~1~|~1~|~01/CMQ~|~Construction of Phase 3 of the Oxford Area Trail Network, and paving of the fine graded gravel section of the trail between Bonham Road and SR-73.~|~28 - Facilities for Pedestrians & Bicycles~|~20A3C85D4C6DB259DC1326DABDBB4B55F1EDBAA2 108112~|~1~|~2~|~02/ENH~|~Split to cover Part 2 work programmed under PID 109427: construction of a shared use path from Talawanda Middle School to Oxford Community Park.~|~28 - Facilities for Pedestrians & Bicycles~|~1E1688DF3FC4D829CE703AE76FF89B0F4D0B3AFF 124102~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~D131D1F702FCDAAD774C81D2232268940B7BED72 98080~|~1~|~1~|~01/STR~|~Microsurface the exisiting roadways on various roadways in D7 for preventative maintenance.CHP SR 235 SLM 0.00 to 6.59CLA SR 235 SLM 8.84 to 11.83MER SR 219 SLM 1.09 to 6.13SHE SR 589 SLM 0.00 to 4.70(OC 000)~|~05 - 4R Maintenance - Resurfacing~|~04D0282D6C166CDE72EF5A38427EE47B0A9A87F7 115502~|~1~|~2~|~02/BRO~|~Local section - Field pave the invert of the bridge type culvert~|~04 - Reconstruction - No Added Capacity~|~4ABB122817C5B029C64747425A2ACD25DE14BB96 115502~|~1~|~1~|~01/BRO~|~State section - Field pave the invert of the bridge type culvert~|~04 - Reconstruction - No Added Capacity~|~0B26CF7C180DBE115810CCB0775ABF9CE08BAE78 104933~|~1~|~1~|~01/MPO~|~Streetscape work eligible for federal funding.~|~28 - Facilities for Pedestrians & Bicycles~|~461EDCE7AF05492DBD1770297456E1FDC3021F80 104933~|~1~|~2~|~02/NFP~|~Streetscape work not eligible for federal-aid i.e. 100% local pariticipation~|~28 - Facilities for Pedestrians & Bicycles~|~C9649237FC4C465769B1E183AE641E6899EC7330 94177~|~1~|~1~|~01/NHS~|~Replace existing superstructure on bridge JEF-7-1979 (SFN 4101081) with new steel beam superstructure and composite reinforced concrete deck. Convert abutments to semi-integral and repair substructure as needed. Provide new full width approach slabs. Raise bridge to meet current standards.~|~13 - Bridge Rehabilitation~|~5918E955A6B97BED61A603AD013BD88878D0BF23 82315~|~1~|~1~|~01/NHS~|~Resurfacing - 80/20 - District Allocation/City of Norwalk~|~05 - 4R Maintenance - Resurfacing~|~26E0F54472C95EFFDA423CF8FBB09E3F868370D6 82315~|~1~|~3~|~03/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~6C6279EF1B8EF9918402190D949DC987C51B22AE 82315~|~1~|~2~|~02/S<2~|~100% City of Norwalk~|~05 - 4R Maintenance - Resurfacing~|~779481888EFE4E99D79F3959C4C670AA46325821 82315~|~1~|~5~|~05/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~9C5941F6A7C8E1A4151E5EE93D0259F296DACAD6 82315~|~1~|~4~|~04/S<2~|~Resurfacing - 80/20 - District Allocation/City of Norwalk~|~05 - 4R Maintenance - Resurfacing~|~AD29C7E4DC64EBC44CDAAE59136B1FD071E9299B 116456~|~1~|~1~|~01/MPO/MASS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A3F47A767B8EEBA3C61945D360795C01BFCBFB8D 115340~|~1~|~1~|~01/MPO/KENT~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~C93BAA821598A52FE7301293A870148001E18CB7 115340~|~1~|~2~|~02/S>2/KENT~|~100% city of Kent items, including replacing/relaying decorative brick pavement and sidewalk, replace concrete curbs and reconstruct/adjust catch basins and manholes.~|~04 - Reconstruction - No Added Capacity~|~8EA4635C9C2D325E340EAB54108EF160BBB9275A 92614~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work in the urban area using federal STP funds. SLM 1.68 to SLM 2.71~|~05 - 4R Maintenance - Resurfacing~|~9448D32D94CD1DB972E349F3FB4BF2606CFAE399 92614~|~1~|~2~|~02/STR~|~80/20 fed/state funding split for all work in the rural area using federal STP funds. SLM 2.71 to SLM 5.54~|~05 - 4R Maintenance - Resurfacing~|~61B4DFBD93ECB4C847DA88D52C24F2DC88CE45B6 85352~|~1~|~1~|~01/NFP~|~River Trail Phase 4 in the City of Marietta. Rehabilitation of the Harmar Railroad Bridge for shared use path over the Muskingum River. 100% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~9DB4AD67041634A798FEE9ADDDEA709CCE540B55 114458~|~1~|~1~|~01/STR~|~Resurfacing SR 331~|~05 - 4R Maintenance - Resurfacing~|~1DF3EA4A3896649F6A3C1A250666451B58AD2010 122566~|~1~|~1~|~01/S>2~|~ORDC Share ~|~08 - Bridge - New Construction~|~F4B9B43C36969C2FA25F9A4C75B064D80A28483F 98854~|~1~|~1~|~01/MPO~|~80% federal w/20% local match for eligible pavement repair work.~|~05 - 4R Maintenance - Resurfacing~|~08877FD40C71DF18788208CDA9A78484A93F3603 110434~|~1~|~1~|~01/NFA~|~CEAO Safety (4HB7)~|~05 - 4R Maintenance - Resurfacing~|~B966B4D04F80365DCBED87EC52ADCA1DA391A727 114583~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 218 10.26. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CA8952C091627A7C84159AA50C092C862C167B08 122326~|~1~|~1~|~01/IMS~|~Plan split for interstate bridge rehabilitation~|~13 - Bridge Rehabilitation~|~BC355F87E3E225E8C69672DD0AD66B33FC69048C 92423~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds SAC 4PS7.~|~21 - Safety~|~E6F24242F869295757D497340924FC9335999949 99879~|~1~|~1~|~01/CMQ~|~Upgrading signals along SR 14, SR 43 and SR 303 at various intersections in the city of Streetsboro.~|~21 - Safety~|~DFA4EC428A11672552E65EEA7C08CEFE8B8B4F51 99879~|~1~|~2~|~02/NHS/STRS~|~100% City of Streetsboro items, including unwarranted signal work.~|~21 - Safety~|~5984B16D472170A949B1BBE30774286CBC3653A4 117353~|~1~|~2~|~02/BRF~|~All other work on the bridge. 100% local funds. ~|~~|~4FCCBC55321FDFEEDC5DD0B0F28D60FB01D59DA8 117353~|~1~|~1~|~01/BRF~|~Work including only the superstructure replacement. ~|~13 - Bridge Rehabilitation~|~D0791F70842BA4822670B5426A7B224BD3C8D4DD 97613~|~1~|~2~|~02/NFA~|~Replace MRW TR 189 0.49 (SFN 5930340) over Dry Creek~|~10 - Bridge Replacement~|~6AC1E8DB27AE9A5A6A4689FE18236F222240F45B 97613~|~1~|~1~|~01/NFA~|~Replace MRW CR 201 2.04 (SFN 5930391) over tributary of Dry Creek~|~10 - Bridge Replacement~|~B646D64EE77DD5CA93709CCE846DC54E5C4B9738 104015~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. PRE-TR 106-0055 (SFN: 6833136) which carries Guy Murray Road over Whitewater Creek.~|~10 - Bridge Replacement~|~6571460A0925E2514396748E536F6B3AC9A20FEC 103108~|~1~|~1~|~01/SAF~|~Upgrade the traffic signal hardware at the intersection of US 30 & Beaver St., US 30 & Market St., US 30 & Jefferson St., SR 45 & N. Park Ave. and US 30 & SR 154 in the Village of Lisbon. Minor radius improvement at the US 30 & SR 154 intersection.~|~21 - Safety~|~90F01B08F1E5FE3B6FEF24D28AD0C7B4C4B55ADE 110093~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 17.60. Funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6DE37181ADC6655839E89990D736F022576ABE58 98645~|~1~|~1~|~01/SAF~|~Guardrail.~|~21 - Safety~|~AE6DA2E60CCD4057A41448D175FCB607B9BD8CB4 97634~|~1~|~1~|~01/NFA~|~Replace SFN 7832818 TRU Corinth Court Road (TR-261) Bridge over Sugar Creek and bring up to current design standards.~|~10 - Bridge Replacement~|~82369E54B086D781400F9DFA368A11B49170B9BA 110072~|~1~|~1~|~01/NFA~|~FAY 753 from 1.09 to 5.24~|~05 - 4R Maintenance - Resurfacing~|~CF49B3FE81DC2DE47898076D3AEDE70CE7267505 110072~|~1~|~2~|~02/STR~|~PIC 207 from 0 to 5.01, PIC 207 from 5.01 to 9.57, PIC 361 from 0 to 4.67~|~05 - 4R Maintenance - Resurfacing~|~4BF579C8A51A197E5E24C923FEA92C87424A55FF 101061~|~1~|~1~|~01/STR~|~Chip sealing.~|~05 - 4R Maintenance - Resurfacing~|~E593BF5851E3D12DB469F51A3D4751DD5E6D4ACB 108419~|~1~|~1~|~01/NHS~|~Mill and fill in the City of Huber Heights. MOT SR 202 SLM 4.37 to 5.40~|~05 - 4R Maintenance - Resurfacing~|~BD4F9B14D9A19802655BB47168AAA4895F3571E3 116680~|~1~|~1~|~01/STR~|~On SR 235 in Hancock County from SLM 8.98 to 12.79~|~05 - 4R Maintenance - Resurfacing~|~BA07CB8CE2582894280A009E604B53B397D7B3F9 122055~|~1~|~1~|~01/ENH~|~Plan Split for Transportation Alternatives Funding~|~28 - Facilities for Pedestrians & Bicycles~|~94A1750BAD0B8E398BA06C4BFDA92ABEC3809377 114050~|~1~|~1~|~01/BRF~|~Replacement of Bridge PRE-TR 216-0.65 (SFN: 6841333)~|~10 - Bridge Replacement~|~728A5EDAB623AFA0A16FF2EB81871BB7563ABF34 122447~|~1~|~1~|~01/S>2~|~Drainage improvement along SR 750~|~66 - Resilience Improvement - Highway Project ~|~A12F2F56FD8CAE5217C53B4C23A0617CC4D181F1 94464~|~1~|~1~|~01/IMS~|~Erosion repair at SUM-IR271-0.03, in Summit County, Ohio.~|~~|~554D39C18CF94A91DC60B79D8156511DFC5DD58F 117917~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-D~|~44 - Other~|~0AB569AE34079199B378F32CBD5C74781B060360 116787~|~1~|~1~|~01/IMS~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~356814B33AA71D27020D1A858DAA19E913AD4E4E 122444~|~1~|~1~|~01/IMS~|~All items of work associated with the resurfacing of I-71. Also includes work on drainage, guardrail, signing and other miscellaneous items.~|~04 - Reconstruction - No Added Capacity~|~0EA8A4E7119A12A1598B7AE236C49D53B44D1F97 99468~|~1~|~1~|~01/STR~|~Geological Site Management 4SF7 (80% Federal) / 4SS7 (20% State) -Drilled Shaft Wall GUE-SR 83-9.33~|~44 - Other~|~47B156C2D0ECC96673F702194E1ABD61EE05E16D 115747~|~1~|~1~|~01/S>2~|~Plan Split for the 80/20 (ODOT/City) items for the urban paving~|~05 - 4R Maintenance - Resurfacing~|~A2460979BB73F2D2D1114A68724432A915BD230D 115747~|~1~|~2~|~02/S>2/NOR~|~Plan Split for the 100% Safety items and all other non-eligible items from the urban paving program that are considered 100% local costs. ~|~05 - 4R Maintenance - Resurfacing~|~D2B7FD1A36397F8DCAB90F3DF038E24FFD5DC5A2 111009~|~1~|~1~|~01/SAF~|~Intersection improvement on ATB SR 45 at Clay St.~|~21 - Safety~|~DD2EBC60D5A3DF8386FF32B3046AD80323B088D4 111009~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~3F81F8B113C7035BFECBB5E7D297D0BE940F7B3F 96615~|~1~|~1~|~01/NFP~|~All work to replace two bridges. None of the bridges have a sufficiency rating or deck summary rating low enough to be eligible for federal funds for a bridge replacement. Funding is 100% state funds from the District Preservation Program SAC 4PS7.~|~10 - Bridge Replacement~|~67F81B44287A4528D6C27C256807C2226663B0F4 96615~|~1~|~2~|~02/STR~|~Safety funded work along SR 115 at SLM 8.26 and 8.50 to make shoulder and guardrail improvements. ~|~21 - Safety~|~414B4730317056F7921C77199634F6932594B48D 107917~|~1~|~1~|~01/S<2~|~FAY-22IC, 62IC and 753 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~3592747FA61401398E3E60E0517602A73DC911C3 107917~|~1~|~2~|~02/STR~|~FAY 435 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~006FBE185C50169704E848659FE4847F86C66AE6 116959~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~C0539FDD1302DC8CBCA64E765FE95EDA3A129169 122302~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~79638F9FC4F34702D20CEF758659A09AAB1916CC 98657~|~1~|~2~|~02/IMS~|~Split for ding-and-dent work, 100% state~|~44 - Other~|~AAC90DE2D7E91DA922B60025CA446804186C44BD 98657~|~1~|~1~|~01/IMS~|~Plan split for fed/state split for guardrail upgrading~|~44 - Other~|~01833D294FAE4B3849F5EE2DEF6CF821EA234953 98657~|~1~|~3~|~03/IMS~|~Plan split for misc. non-guardrail work.~|~44 - Other~|~50B472F19FBB426A2DC2FA2AA1ED0EF8BF147002 98657~|~1~|~4~|~04/NHS~|~Split for guardrail upgrading on US-422~|~44 - Other~|~341B9ECD378E0256578BF220932415C55828FA78 85209~|~1~|~1~|~01/ERD~|~"01/ERD/OT" - Location unknown; reconstruct the Tuscarawas County Tourist Information Center, (which was located in the IR 77 rest areas that were demolished).~|~44 - Other~|~BAA07A367C72834A8E78D5A706060242E581CA37 119353~|~1~|~1~|~01/S>2~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~F726EE3055F3E4FDB9B7CA12F377D356F0362FF7 114173~|~1~|~1~|~01/STR~|~added split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D470FAACA70A18641F8069FCB556210D42BDF065 87144~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 690 1.60-5.00. 100% State.~|~05 - 4R Maintenance - Resurfacing~|~E83B9DF742F6C5EDDB954DEF8E0BA5537A4E4C4A 87144~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 690 0.00-1.60. Rural other federal aid funded 80% Federal and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~53699A5F87B23B07A3A2BF9B1C9368CCA8E40758 98844~|~1~|~1~|~01/MPO~|~Mill and fill Elyria Avenue from Lorain SCL to SR 611, including curb replacement.~|~05 - 4R Maintenance - Resurfacing~|~19D282A3EF24CA7E506078DB8EA46DAB670E7D1D 107771~|~1~|~1~|~01/IMS~|~Covers all work to rehab bridge.~|~13 - Bridge Rehabilitation~|~C54BF0D71AC6FC6E6F37B04D1B5060790A077DF5 99013~|~1~|~1~|~01/SAF~|~District wide fast dry pavement marking~|~21 - Safety~|~D7221D272DC272386F431D76D4AE917B364076FE 93467~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split using federal aid NH funding for the bridge replacement work.~|~13 - Bridge Rehabilitation~|~2846EEFD1AC8980DD468DCDADC936E7C8ECF46AB 121191~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway lighting on the state maintained highway system throughout District 11.~|~21 - Safety~|~F852B6A492BD077618C3E4B4B4B330EDAFB0BA62 99469~|~1~|~1~|~01/STR~|~Geological Site Management 4SF7 (80% Federal) / 4SS7 (20% State) -Drilled Shaft Wall GUE-SR 265-12.80~|~04 - Reconstruction - No Added Capacity~|~CDEC05AE5DACFC89C7761496C909D76EA29A4A7B 83451~|~1~|~1~|~01/NHS~|~District AllocationPreventive Maintenance: Spot painting structural steel (021)~|~13 - Bridge Rehabilitation~|~596A9E2047D55491553E35B682B0943A8EC453D2 102690~|~1~|~1~|~01/SAF~|~paving, signage and signal upgrade.~|~21 - Safety~|~A78AA9A814DAF1C57AFF9B67D77AAF9294A50CD1 100739~|~1~|~1~|~01/NFP~|~RPM's on various routes~|~44 - Other~|~6B98CB3A311345DE96D611686599764F170EBDAF 122117~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items~|~21 - Safety~|~A84EBDEF03EA1E9613946138FAD83D7D70A3608B 98642~|~1~|~1~|~01/STR~|~SFN 5400333, MER-29-0780 on Big Beaver Creek - remove and replace entire bridge structure with new bridge (substructure and superstructure).~|~10 - Bridge Replacement~|~6750430E65948AB7BCC9CF692DB91C1261602A0E 107904~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - On portions of Kno-SR 3-17.82 to 34.71; Lic-SR079-17.00 to 33.10; Lic-SR 586-01.00 to 09.00 Per-SR 37-00.00 to 08.59; Per-SR 37-15.02 to 20.69;~|~21 - Safety~|~0B6AA6A454CDF076BF6CD0F8C257DA154D22C9D2 106350~|~1~|~2~|~02/NFP~|~Part 2 of the contract~|~20 - Environmental Only~|~CE35305B5C05683FB8F1CC98EA25A256E5930763 106350~|~1~|~1~|~01/NFP~|~Part 1 of the project~|~20 - Environmental Only~|~653AAB0D4E8D9CD1022AC8AD5BB8E0CA119B3D79 114556~|~1~|~1~|~01/STR~|~AC Overlay with repairs.~|~05 - 4R Maintenance - Resurfacing~|~F7F43B58551EAE204C232B5C4A90AB0C772400FA 114556~|~1~|~2~|~02/S5K~|~AC Overlay - STP 5k~|~05 - 4R Maintenance - Resurfacing~|~9A2DBBDF386A4DD58D6835AE83CF45B81ED538F5 114556~|~1~|~3~|~03/S5K~|~AC Overlay - Urban Paving in Bellefontaine~|~05 - 4R Maintenance - Resurfacing~|~F6B9B73387742574C60DC8A538CCD983F0D6702D 99864~|~1~|~3~|~03/STR~|~Paint existing steel superstructure and seal necessary concrete surfaces.~|~13 - Bridge Rehabilitation~|~067372CDAC95DF5591DCFFAC9EEC4B2102D03B78 99864~|~1~|~1~|~01/NHS~|~Paint existing steel superstructure and seal necessary concrete surfaces.~|~13 - Bridge Rehabilitation~|~2B4F88ADB52A44F347A9560E62F2B861162BE5A5 99864~|~1~|~4~|~04/IMS~|~Paint existing steel superstructure and seal necessary concrete surfaces~|~13 - Bridge Rehabilitation~|~986372D3AC38DC25AE8C59064B90BF096E39B808 99864~|~1~|~2~|~02/NFA~|~Paint existing steel superstructure and seal necessary concrete surfaces.~|~13 - Bridge Rehabilitation~|~D13187703059FB4576E8F274B597E5DE7268F4FE 115219~|~1~|~1~|~01/SAF~|~Sidewalk & Ped Facilities. ~|~21 - Safety~|~4409C685F0617C08EAF19C12400FE91697875188 113085~|~1~|~1~|~01/STR~|~Added Bridge plan split~|~10 - Bridge Replacement~|~6ABA0942059F09379E470232DC983A8BE2A1DBF7 92653~|~1~|~1~|~01/S>2~|~Replacement of SFN 7700849 over Yellow Creek~|~~|~2E7C5E25FD7DFE163F54ADF6A26318C588F5FC96 100325~|~1~|~1~|~01/NFP~|~This is the district's annual auxiliary pavement marking project.~|~21 - Safety~|~F8C978F4BF0FA261DC9C7E796001B56C808FAEBD 114933~|~1~|~1~|~01/S5K/CONN~|~Resurfacing, urban paving in the city of Conneaut.~|~05 - 4R Maintenance - Resurfacing~|~5864A2A4BE34BC4D332F0097312CCF5C5F417495 114933~|~1~|~3~|~03/S5K~|~Bridge preventative maintenance work. ~|~47 - Bridge Preventive Maintenance~|~2A0FC3693E69B6BDD88D0F2EE233E95A5D3C151A 114933~|~1~|~2~|~02/S5K/CONN~|~Full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~083B4D40234B61FE9BF9CD93AF474CE4A494B315 126963~|~1~|~1~|~01/NHS~|~Roadway~|~03 - Reconstruction - Added Capacity~|~E95DBA9BC2DC0922FCCBC17184330198E9B180A7 95757~|~1~|~1~|~01/STR~|~OTT-SR163 from SLM 9.98 to 13.80 OTT-SR163 from SLM 14.25 to 15.27~|~05 - 4R Maintenance - Resurfacing~|~56631C90B75E9D1F07E203865595D0BB4DA6AD2A 95757~|~1~|~2~|~02/STR~|~Bridge split~|~05 - 4R Maintenance - Resurfacing~|~66191F0FC9B58A001DF8E9594E8B00506D082D6E 102698~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~143A1EC9A31D5C6EE79FC50C780568D14A693D2F 102698~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~81EE80EC5F16C7D60A4A0312696FB0EADFC252CC 102698~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~1735313AD658E02DB7809A5B0D269627D47746ED 116856~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~AA85DE78BD8A601532859812E505F76C1A2E26E7 116856~|~1~|~2~|~02/S>2~|~Curbs at 100% local~|~04 - Reconstruction - No Added Capacity~|~6039C3B5C561F68BC7D87240A8DE2EB98E47AEE4 116856~|~1~|~3~|~03/NFP~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~AE670F372C96800D09CCEAD1629E306A390D86E1 83861~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - District Preservation - 4CP7 (100% State) - Two year contract for Guardrail repairs; upgrades; and replacement within District 5 on IR; US; and SR~|~21 - Safety~|~202B2F82C13281D1E44266BCC6BC0A5E2402E12D 89718~|~1~|~1~|~01/ENH~|~Plan split for all work eligible for enhancement funding~|~31 - Landscaping & Other Scenic Beautification~|~21EC01A4D4B7133D7F5FCC97F52B383A7D0CA9E4 89718~|~1~|~2~|~02/ENH~|~100% local funding split~|~~|~7D27271C2260A83D8DBBB7E29CB55577DC0D6CBB 126019~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5CD890BA16C13CE7B962842694717A7DFC3636DF 107380~|~1~|~1~|~01/STR~|~2 Culvert replacements~|~04 - Reconstruction - No Added Capacity~|~03FB1484661507C02D7FF3E876BE6E8A6F521AAC 121194~|~1~|~1~|~01/NFP~|~District wide systematic RPM replacement project~|~21 - Safety~|~DE7829F58AD17E181A98E0AE7FBF4E051A6CB67A 118674~|~1~|~1~|~01/S5K~|~Install pavement markers on various county roads~|~21 - Safety~|~5CD1C63057EE9F32EC05BD4D247817D39EE2C216 98377~|~1~|~2~|~02/NHS~|~Minor Bridge work to SFN 6701132 POR 43 11.52 over Cuyahoga River and CSX Railroad~|~~|~E606C860E9397EA958FE322E1F4F73F8EBAB2C26 98377~|~1~|~1~|~01/NHS/KENT~|~Resurfacing POR SR 43 from 11.78 to 12.19 and 12.28 to 13.21 and POR SR 43D from 0.00 to 0.35.5 in the City of Kent.~|~~|~8AC2E6AB963F7B7107D18F427EFC36D6C4B4E5B0 101138~|~1~|~1~|~01/STR~|~DSR# BEL-015~|~04 - Reconstruction - No Added Capacity~|~DF195271B7AC56880CD04C6C39E168ADCA95A902 110377~|~1~|~1~|~01/SAF~|~Add turn lanes at the intersection E Broad St and Reynoldsburg New Albany Rd~|~21 - Safety~|~EFE834AC2C2D1EB269C83AFABF0E14D028ACDE06 106779~|~1~|~1~|~01/MPO~|~MPO funded 80/20 split~|~47 - Bridge Preventive Maintenance~|~DD115077A053953F9D5599D48ECAD29FCDAF49A3 106779~|~1~|~2~|~02/BRF~|~100% LPA on 2nd St bridge~|~47 - Bridge Preventive Maintenance~|~B733B3838E3897F7B68D43BE82977B43A0A3BC4B 100979~|~1~|~1~|~01/NHS~|~DSR# HAS-002~|~04 - Reconstruction - No Added Capacity~|~EA695A4884D30EFDC8C6287F0A78554347689D50 107816~|~1~|~1~|~01/S<2/Bprt~|~Emergency landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E59693B058968FF6C2EA88F60788C26AAC0695EE 112369~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in HOC Co. Funded 100% Federal.~|~21 - Safety~|~56774E0C585BD9FC174480A0AFC68A50CB7F8B93 101897~|~1~|~1~|~01/MPO~|~Mahoning County Engineer.~|~21 - Safety~|~CF8BBA55D575E3AE2863EAE1AC2F70B7B45ABBF0 91966~|~1~|~1~|~01/S<2/COSH~|~"01/S2~|~Dryden Road rehab in the City of Moraine.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD7B082BBE55F799E9F4CDBFF57E62C3D39A6E66 105854~|~1~|~2~|~02/SAF~|~Signal work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BC88D81C53D8DE2E2EC51199F160341D3C2498F6 126765~|~1~|~1~|~01/STR~|~Pave culvert invert.~|~04 - Reconstruction - No Added Capacity~|~204A8B4E343F87F18A70E262CAD714FAA331917D 111424~|~1~|~1~|~01/SAE~|~Split for safety upgrading of intersection.~|~21 - Safety~|~3A7116A2EEFD3692E4CEE10965F90A8D0021DF67 125512~|~1~|~1~|~01/IMS~|~Interstate resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A6894049F7BE802255A6B31E4C48336FCB2424A5 125512~|~1~|~2~|~02/NHS~|~Resurfacing NHS~|~05 - 4R Maintenance - Resurfacing~|~EBCF9F3983901B59F646B31A86B74B13F58940D1 125512~|~1~|~3~|~03/S>2~|~Resurfacing STP >200,000~|~05 - 4R Maintenance - Resurfacing~|~EE56D3C5C759250DB3B5C061BF482315108B8A46 125512~|~1~|~4~|~04/S5K~|~Resurfacing STP 5,000 - 49,000~|~05 - 4R Maintenance - Resurfacing~|~3407551C30D63592BBEB6C1A3B9CA874EC6DB011 125512~|~1~|~5~|~05/STR~|~Resurfacing STP Rural~|~05 - 4R Maintenance - Resurfacing~|~76856B379169D16F28D19FF9D5E7EB01C711317A 116648~|~1~|~1~|~01/MPO~|~Purchase of bike share equipment for expansion of the system in the Cincinnati area.~|~28 - Facilities for Pedestrians & Bicycles~|~5C63B5748116D6EAA953ACC65242722E5E642852 119992~|~1~|~1~|~01/NHS~|~Smoothseal WAY-30-0.00 to 9.18~|~05 - 4R Maintenance - Resurfacing~|~C2DD7E487419D02BC875962B108C9322B41169F2 93320~|~1~|~1~|~01/S>2~|~Remove asphalt wearing surface and replace with microsilica modified concrete overlay with minimal approach work on SFN 5712084 MOT 835 0257 over Little Beaver Creek.~|~13 - Bridge Rehabilitation~|~2329E9AFD55DDC65E4D0809D4A31D86DB0FDCBC6 100496~|~1~|~2~|~02/NHS~|~SCI 52 31.85 7301952SCI 52 31.86 7301928~|~47 - Bridge Preventive Maintenance~|~2906B624F9BE64E22F7F728A732016ED338596B7 100496~|~1~|~1~|~01/NHS~|~SCI 52 31.24-33.82~|~05 - 4R Maintenance - Resurfacing~|~BA9B954D9A325941EB5AD91E9D268C87B61ED30B 100496~|~1~|~3~|~03/NHS~|~Line CulvertSCI 52 33.11 (CFN 1885394)~|~04 - Reconstruction - No Added Capacity~|~6ABE41E402D4D04327C169E08845692B29756486 105933~|~1~|~1~|~01/MPO~|~Resurfacing work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~381618357CEE81A67447253C79355FB78B69E2BC 105933~|~1~|~2~|~02/NFP~|~100% City funded work items~|~44 - Other~|~8F8F881AC137C75F3D8A67D8D1898D1C8E45DAC8 91804~|~1~|~1~|~01/NFP~|~Sanitary/waterline work at IR-80 rest area.~|~~|~C37897975B99FE9432BDE49989500F24F22A4C48 106367~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridge.~|~13 - Bridge Rehabilitation~|~5AC3F8B3BAF217DB6063B931A023E7A9512EE853 123990~|~1~|~1~|~01/S5K~|~Resurfacing project on HOC CR 14 0.00-0.814, HOC CR 17 0.00-1.105.~|~05 - 4R Maintenance - Resurfacing~|~A2BBE473AF845FE33AB809DE21B0A2D81D731A7D 123990~|~1~|~2~|~02/STR~|~Resurfacing project on HOC CR 14 0.814-1.76, HOC CR 17 1.105-4.888, HOC CR 25 2.308-3.87, and HOC CR 33A 0.00-1.85.~|~05 - 4R Maintenance - Resurfacing~|~37D093FE9AC2846FC71BACC36B6AD5147A1FA925 93740~|~1~|~1~|~01/SAF~|~Upgrade traffic signal at Valley and Harshman. Build campus pathway with lighting from Rohrer Blvd. to Mad River Middle School. Install sidewalk along Enright Street. Build campus pathway for Beverly Gardens Elementary.~|~21 - Safety~|~3A745D1CB0157E0E1D105967F7AA358823D2A0DE 114199~|~1~|~1~|~01/IMS~|~FY 2027 Drainage.~|~44 - Other~|~C0058DE6BEAFD6D2B17D05F8676228D3A9F1F71D 116100~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM Counties.~|~05 - 4R Maintenance - Resurfacing~|~331361405296BDB94B25C3801CF66BE6C847B0C3 116100~|~1~|~2~|~02/SAF~|~Pavement grooving.~|~21 - Safety~|~CDD31A114DD23540DFCB3F1797F6E5CC12A96F68 108239~|~1~|~2~|~02/NFP~|~Local funded roadway section of project - Miller St to W. State St.~|~04 - Reconstruction - No Added Capacity~|~78C8FF8754BB6F465803960A49591490F9C78EB2 108239~|~1~|~1~|~01/S<2~|~Rawson Ave - Small City Funds Plan Split - North to Miller St.~|~04 - Reconstruction - No Added Capacity~|~3CC3AB0555D74E10C3F2F94F159121EAA7E5A8CB 108239~|~1~|~3~|~03/SAF~|~Plan split for safety funds to be applied to the signals.~|~21 - Safety~|~D0BB5A6E8BA9B34F09A6FAB0649A42698CE3126D 123009~|~1~|~1~|~01/NHS~|~Districtwide signal installation and repairs.~|~21 - Safety~|~EECFEC8136A39CADB700DEDFAE8AD73DB6847363 123009~|~1~|~2~|~02/SAF~|~Installation of Pedestrian Hybrid Beacon (PHB).~|~21 - Safety~|~8E8F78F0EC2E2EBC0E0C2D470B732C3DD8B32A50 112930~|~1~|~1~|~01/STR~|~MRW-61-14.13 to 14.83~|~05 - 4R Maintenance - Resurfacing~|~F10A2EDD707F90185704FD0890835430F7B01DCA 122277~|~1~|~1~|~01/STR~|~Replace UNI-37-12.24 structure over Bokes Creek~|~10 - Bridge Replacement~|~1DA34C9F4B86546F03E5C40859D6C27A4F30D638 103988~|~1~|~1~|~01/NFA~|~Construction inspection for soil and compaction testing services.~|~~|~DACE765BB341B545548822FA6CA69848497EC1BE 97552~|~1~|~2~|~02/BRF/RIC~|~SFN7032048, Ohio Bridge Partnership Program, RIC - TR 0037 - 00.19~|~~|~65A6D3A2A1B2BBDA8E4F975261EED53D21F0EB35 97552~|~1~|~1~|~01/BRF~|~SFN 7033559,Ohio Bridge Partnership Program, RIC - CR 0371 - 02.86~|~10 - Bridge Replacement~|~7D023187B500BD22F0FB4141F3A4DAA53EBC536F 97552~|~1~|~3~|~03/BRF/RIC~|~SFN 7032471, Ohio Bridge Partnership Program, RIC - CR 0048 - 01.61~|~~|~9E6F6E4A5E4DAB64736F503CFDAC4230E580D61E 104920~|~1~|~1~|~01/NFA~|~Belaire Harbor tug boat engine replacement project~|~44 - Other~|~1021C5011D93FF92F1479DD8D2DBA1B5BDCE06E0 115234~|~1~|~1~|~01/SAF~|~Sidewalks in West Union~|~21 - Safety~|~52D96269CFA32EB9E7DEBCC8E0137CADBACFC472 104991~|~1~|~1~|~01/NFP~|~District Preservation Other Funding - 4PS7 (100% State) - No CAP - District wide Crack Sealing Project~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CAFCF15235D0688921D1B4B758F4A87918F4325F 120320~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 212 over Atwood Spillway.~|~10 - Bridge Replacement~|~D608FA6C98BB376EF17C5CDCA7BBE7CA6F52181D 94535~|~1~|~1~|~01/S>2~|~80% Federal / 20% State funding participation using Geologic Site Management funding.~|~44 - Other~|~D4F75D985781C12AB41DEE71FA33E72BD880A825 110690~|~1~|~2~|~02/NFA~|~Pavement repairs on Township Rd~|~05 - 4R Maintenance - Resurfacing~|~7F008F8ABDFF5C8D262DB5AB962F37907E50FBAC 110690~|~1~|~1~|~01/STR~|~Pavement Repairs on SR 739.~|~04 - Reconstruction - No Added Capacity~|~982E1755B876A82E989E977E7ABF5518450C9927 115686~|~1~|~1~|~01/IMS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~7E929753151DB97FD45B6E60CBADC0B1424BD79D 119362~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9AE015078FA4EBD23677E61AEFDB3323CDE38DB9 94111~|~1~|~1~|~01/S>2~|~Resurfacing of SR 45 from SLM 7.32 to 7.91 in the City of Warren.~|~~|~8BEAC5CBB3A511CF83C32903BA5F618979583058 90453~|~4~|~3~|~03/MPO~|~100% Local Items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F91D439B802BCE75D68EDE479D7B018A10D5A29 90453~|~1~|~1~|~01/MPO~|~ERPC - STP Funds for 4R Maintenance - Restoration & Rehabilitation for Minor rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4528DD9D853218DD8FC06675F7D27D1C9572E042 90453~|~2~|~2~|~02/MPO~|~TE/TA Funds~|~31 - Landscaping & Other Scenic Beautification~|~E6F91DB078475BD0F28D417B0C20B63583EC3C99 99548~|~1~|~1~|~01/STR~|~Culvert Replacement: CRA-103-16.89~|~04 - Reconstruction - No Added Capacity~|~78F8FAAB47AE9DD469AE6C1E36E9068C18457623 96525~|~1~|~1~|~01/MPO~|~Rehabilitation of 4.25 miles of pavement within the City of Ontario. Work includes partial depth pavement replacement, milling, asphalt pavement, minor guardrail and drainage work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~39FB68A4D29F9287A97DBD4A46DC1F8B89F4D5C4 115005~|~1~|~1~|~01/MPO/SPR~|~Improvements to the intersection of Central Avenue and Edgebrooke Drive including installation of a new traffic signal, pedestrian crosswalks and sidewalks.~|~21 - Safety~|~F60AEFFC86F01F24DCBD1315D7FCA56F271454E6 114314~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP/OT/ " -Plan Split 1~|~21 - Safety~|~C0A180167DF69ED9F9A9F232564DFE4427DA4CBF 101723~|~1~|~1~|~01/SAF~|~Install new guardrail along MRG CR 2A, 3, and 84. Work will include posts and railing. Funded 100% federal.~|~21 - Safety~|~24CDC2F8490A9C5B9A12F57895BA512C066E0233 95351~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay and abutment patching. GAL 35 13.78 L&R, (SFN 2701103 L) and (SFN 2701081 R). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~78932F6C4D0DEB941356FE5B29A14E9FD5DA4AF8 106283~|~1~|~1~|~01/NFP~|~Pavement markings along various routes in Ashtabula, Mahoning and Trumbull Counties.~|~21 - Safety~|~10C2246DA128DB19830BCCDBD04ABE3B8008AB50 103289~|~1~|~1~|~01/NFP~|~Pavement plan split~|~99 - State Preventative Maintenance~|~4F88817B10CEBB7016E541279240D0DBED33C953 117148~|~1~|~1~|~01/STR~|~Landslide repair project using excavation/dump rock. GAL 553 0.61-0.62.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6DD1C130990B2904CC4291717F1BDEF74C55D899 107442~|~1~|~1~|~01/NFA~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~F30CA80C3633F2755FE91BCB02035BF2DF6C6AA9 105211~|~1~|~1~|~01/STR~|~Resurfacing POR SR 88 from 4.03 to 7.95 and POR SR 303 from 13.04 to 13.21.~|~~|~5B927809CC8ED860F06F890481B14659D0716DA4 105211~|~1~|~2~|~02/STR~|~See linked structures 10' to 20' span.~|~~|~3DCE1FC1A4817A11F69348137FDB408DE127B529 124558~|~1~|~1~|~01/NHS~|~Intersection improvement project, WAS 7 14.10 Logistics Lane. Construction of RCUTs at Veto Rd, CR 3, and Gravel Bank Rd, TR 482. Roadway reconstruction or widening of WAS-CR10-0.00-1.69 and WAS-TR482-0.00-0.30.~|~04 - Reconstruction - No Added Capacity~|~021E5CE5E11CDE9E39E7048341B34654B6294633 124558~|~1~|~2~|~02/SAF~|~Reconstruction, widening and resurfacing of WAS CR 10 0.00-1.69. Safety Funded 90/10.~|~21 - Safety~|~A2E9D9DA93BAF44C7F557BD2D2827C4DE01BE448 113819~|~1~|~1~|~01/NFA~|~Bridge replacement: Replace an existing prestressed box beam over the CSX railroad with a new structure.~|~10 - Bridge Replacement~|~EC1B7EB65B020076BB1B89F28E4712F0D463F673 87670~|~1~|~1~|~01/STR~|~A slide repair at WOO SR65 4.37-4.38~|~44 - Other~|~BB348CFE858CA572DFFE52E3D88CE2097E1864CC 103139~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY22 Construction Engineering Services~|~17 - Construction Engineering~|~7BEBFF0BBF44DBA3784CB8F9D5EC5DB748650A26 103139~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY23 Construction Engineering Services~|~17 - Construction Engineering~|~A2AEDB20503C2292A479F62E51645C14EBD5866F 100755~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. ATH 356 1.51-4.77. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~6F5692A873B2B085782126D3321DBB749BB81641 100755~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. ATH 356 0.00-1.51 and VIN 356 0.00-5.97. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~BB080020F10C415A63B55D52898D24771E62F0C0 96616~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. The bond funds SAC 7BPB are to be used before the SAC 4PS7 funds.~|~13 - Bridge Rehabilitation~|~ACB79B2387BB12CE8D50FD39BC43EE7BB37B1E6A 126304~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~A935DA63528B4AB9DE2C18689FC5D1A72A007CF1 86294~|~1~|~1~|~01/STR~|~Bridge replacement over north branch of Kokosing river. SFN 5900816~|~10 - Bridge Replacement~|~30EE5526D3B7A8FDE75231382830D15A8179B129 105748~|~1~|~2~|~02/NHS~|~Reactive Maintenance - AC Inlay on WAY-30 and CRA-30. No bridge work~|~05 - 4R Maintenance - Resurfacing~|~48887787DB6E3363D3DB3034C07EFCDCF8323C15 105748~|~1~|~4~|~04/NFA~|~AC Overlay w/ Repairs on WAY-TR80347 (East Old Lincoln Way). No bridge work~|~05 - 4R Maintenance - Resurfacing~|~3D95D7047D12A23A6EA8F6F4BD48B5B66C988033 105748~|~1~|~1~|~01/STR~|~Reactive Maintenance - AC Inlay on MED-57-3.49 to 8.828. No bridge work~|~05 - 4R Maintenance - Resurfacing~|~627A2FA946CBCC932E61EBB720E7DEC0DF68B7A9 105748~|~1~|~3~|~03/S>2~|~Reactive Maintenance - AC Inlay on MED-57-8.828 to 10.390. No bridge work~|~05 - 4R Maintenance - Resurfacing~|~6A3444E552F1617552D2B6CCD9E6DA8052B8B38F 101168~|~1~|~1~|~01/NHS~|~Overlay US 68 in Clark County with asphalt concrete: CLA US 68 SLM 7.66 to 12.39~|~05 - 4R Maintenance - Resurfacing~|~6D0BE33FDC49CDBD24F352AF9ACC282D4658DF4F 126033~|~1~|~1~|~01/BRF~|~Primary split, CEAO Bridge funds~|~13 - Bridge Rehabilitation~|~A2AF88171F0AEE63895743E99CEEA799F6948926 124596~|~1~|~1~|~01/S5K~|~Roadway work on CR 35~|~04 - Reconstruction - No Added Capacity~|~5719CFDE95A0F53605CB0950CABF10E698E61E89 123295~|~1~|~1~|~01/SAF~|~Pedestrian Improvement project. ATH 682 2.29-2.49.~|~28 - Facilities for Pedestrians & Bicycles~|~8C583D2712E95F1C66D2DE6913F6221709912513 93672~|~1~|~1~|~01/SAE~|~Construct sidewalks and pedestrian signals along SR304 and side streets near Liberty school campus.~|~28 - Facilities for Pedestrians & Bicycles~|~188C366CA58AA651EC7B0D34296F1B28E6BCD665 102870~|~2~|~3~|~03/S<2~|~Slide repair along STA US62 from SLM 4.60 to SLM 4.63.~|~04 - Reconstruction - No Added Capacity~|~218CAAD271C9F021A859D2AAA889488BBD5832C7 102870~|~1~|~2~|~02/S<2~|~Structure replaced with fill and new road.~|~10 - Bridge Replacement~|~676616A2170321454C490F0D394B4C7C1F459584 102870~|~1~|~1~|~01/S<2~|~Deck replacments.~|~13 - Bridge Rehabilitation~|~1F8ADEDE6CFA42D6CC37E4714B874035BE33B44C 102870~|~3~|~4~|~04/S<2~|~Resurfacing of STA US62T from 0.60 to 1.73 eastbound, 1.08 to 2.35 westbound and 4.40 to 4.67 in both directions and STA SR 225 from 0.37 to 0.76, includes wet reflective pavement markings on STA US 62T from 0.00 to 4.67.~|~05 - 4R Maintenance - Resurfacing~|~32C40E43D7D1D2FDC05A5046AA6801707F37D038 102870~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~DCBF9A9269D1B0E2AD2F2505FE50CFB7667D789B 89004~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill~|~44 - Other~|~D7FDC8566B0770E5FEF00D6E28433294C0405ED5 90365~|~1~|~1~|~01/NHS/Cant~|~Streetscape/economic development project to improve traffic flow and safety. Address roadway pavement, curbs, sidewalks, ramps, crosswalks, lights.~|~04 - Reconstruction - No Added Capacity~|~E0CD8995374207C9C9F6D8D471F763690B907F70 90365~|~1~|~2~|~02/CMQ/CANT~|~Portion of roadway (20%) accommodating two bike lanes and signal work.~|~28 - Facilities for Pedestrians & Bicycles~|~73723A7922304B1F5628485E3B4E681BB3687C40 120933~|~1~|~1~|~01/BRO~|~Plan split for rehabilitation of existing bridge carrying SR 83 over Martin's Creek by replacing the deck slab and abutment breastwalls. The pier piling will also be encased. In stream work is required. This PID is to be combined with PID 97498 and placed on the Sept 2024 Programmatic due to the similarity in project work.~|~10 - Bridge Replacement~|~7F765C54762F999CECCD0C79879D1E51A77DD090 100280~|~1~|~1~|~01/IMS~|~Microsurfacing SUM-IR 480-0.00 to 8.67.~|~05 - 4R Maintenance - Resurfacing~|~FC91FA8B72E32A8764F1D11EF253F1F428139AF1 122689~|~1~|~1~|~01/IMS~|~Install median cable barrier~|~21 - Safety~|~3FAFC2A417E69665077D228A9A1BB2EF503ABE63 97374~|~1~|~1~|~01/ENH~|~NCIT in Bellevue~|~01 - New Construction~|~A109A11FEEADC4EB558A9BAAEA712056F8E3B365 105036~|~1~|~1~|~01/ENH/MTVE~|~City of Mount Vernon TA Funding - 4B37 (80% Federal) / LNTP (TRC 15% Federal) LNTP (5% Local) - See CAP Comments - Construction of multi-use path under SR13 joining the Kokosing Gap Trail to the Heart of Ohio Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~C681A25E9EC319554DDF44D0B5D35D1C40004F65 113868~|~1~|~1~|~01/SAF~|~Install new mast arm traffic signal at the intersection of Salem Ave. (SR 49) & Westbrook Road. In addition, removal of pork chop island and installation of right turn lane on Westbrook Rd.~|~21 - Safety~|~1844C731C80FF7D015E1F4D9D030F55CE34A1FCD 85086~|~1~|~3~|~03/S<2~|~03/S<2/PV This Plan split is for work that is inside the Defiance Urban Area but outside the City of Defiance. It is for the portion of SR 18 that is outside the City of Defiance to the Urban Area Boundary which is at 28.30. All funds in this split will be from the District Preservation Program Budget. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~150D0F5E0364B3AC567C6DF25930DF0F33119C0B 85086~|~1~|~2~|~02/S<2~|~02/S<2/PV This split for resurfacing the portion of the project that is inside the City of Defiance. The City of Defiance is responsible for the 20% non-federal match. The 80% federal funds will be from the District Preservation Program Budget.~|~05 - 4R Maintenance - Resurfacing~|~2FB8E8A6406D27E69753CD8B83DAE8FD7EC392DA 85086~|~1~|~1~|~01/NFA~|~01/NFA/PV This split is for SR 18 from 31.08 to the Henry County Line. This section of SR 18 is a Rural Minor Collector and cannot use federal funds for resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5858555B78B42777DD0668BF3EA78CC1D68E1E7E 85086~|~1~|~4~|~04/STR~|~04/STR/PV This split is for work eligible for rural STP funds. It is for all of SR 281 that is in the project and SR 18 from 28.30 to 31.08. There are no local funds in this event. All funds are from the District.~|~05 - 4R Maintenance - Resurfacing~|~5871489991BCC4C2840351E77EA13C781D067646 85086~|~1~|~5~|~05/S<2~|~05/S<2/PV/DEF This split is for items paid 100% by the City of Defiance. Specialized pavement markings requested by the City of Defiance on routes within the city limits.~|~05 - 4R Maintenance - Resurfacing~|~F5043F3D439F8EE68267365736977C987C6E78DC 119264~|~1~|~1~|~01/SAF/STCE~|~Restripe pavement markings.~|~21 - Safety~|~FD637A47E297B5ACBCFE62FD1375CD346D033424 100337~|~1~|~2~|~02/S<2~|~Microsurface various routes DAR SR 118 1.90 - 2.66~|~05 - 4R Maintenance - Resurfacing~|~25A74F85A47D4BF1B09EEEA2C95008C7AF1A1F94 100337~|~1~|~1~|~01/STR~|~Microsurface various routes in Clark, Champaign, Darke & Miami counties: CHP SR 235 0.00 - 6.59 CHP SR 560 0.00 - 2.76 CHP SR 814 0.00 - 3.07 CLA SR 235 9.00 - 11.83 DAR SR 118 2.66 -7.58 DAR SR 121 19.08 - 24.36 MIA SR 48 SLM 5.29 to 5.70 MIA SR 48 5.70 - 8.74 MIA SR 48 14.60 - 16.88~|~05 - 4R Maintenance - Resurfacing~|~629796256626D2EBC0A8FEADCCB2894892C61FC7 115084~|~1~|~1~|~01/NFP~|~repave the Carlisle Visitor Center roadway and parking area~|~04 - Reconstruction - No Added Capacity~|~31AB0D9555763F4191DB8E4A6BD26BF5E633A2F3 98651~|~1~|~1~|~01/ENH~|~Installation of 10' multi-use path along Oldman Road.~|~28 - Facilities for Pedestrians & Bicycles~|~949DEDC668D82975851916255C4965C914E5BE13 99951~|~1~|~1~|~01/SAF~|~Re-striping various county routes in Stark County.~|~21 - Safety~|~6B0A7940F4248364C8F13A87C61A58496C8B9A3E 97727~|~1~|~1~|~01/S>2~|~Replace deck parapets and convert abutments to semi intergral.~|~13 - Bridge Rehabilitation~|~625803B6C0EE872B64FC8D3FA3F2516E0691FE40 97727~|~1~|~2~|~02/S>2~|~Damage repair~|~13 - Bridge Rehabilitation~|~317BBC603BF0313B8AC28669DC24BE759D85D370 95297~|~1~|~1~|~01/IMS~|~SFN 4805372, SR-51 bridge over I-75 in Toledo.~|~13 - Bridge Rehabilitation~|~0C4453D7A95DB7D57E416AC80F5653651BDC3717 124916~|~1~|~1~|~01/NHS~|~Culvert rehab.~|~04 - Reconstruction - No Added Capacity~|~36EDBD72C24D25459BF8B0686ED6EF1F1AD4422F 117508~|~1~|~1~|~01/BRO~|~CEAO LBR fund eligible work to rehab east structure SFN 1834533 only.~|~13 - Bridge Rehabilitation~|~AF346155B34818273882AC1F0A9A72BFA06271C1 117508~|~1~|~2~|~02/NFP~|~Work on west structure SFN 1834541 at 100% Local Cost.~|~13 - Bridge Rehabilitation~|~D3C3A433D63D4F4ABDF9B1E98AE2DC6E44002345 105290~|~1~|~1~|~01/STR~|~Resurfacing of CAR-164, JEF-164 and COL-164~|~05 - 4R Maintenance - Resurfacing~|~AC63B4E9BC02F3332DA1D529DFD7D3705C9C5A8D 112185~|~1~|~1~|~01/IMS~|~Guardrail repairs/replacements on various routes in District 4.~|~~|~E7069C27F297B08C80E684E636A6DECD2AE6B320 100607~|~1~|~1~|~01/STR~|~1" FGP overlay of COL-518~|~05 - 4R Maintenance - Resurfacing~|~CAA81DA84D7EC88F6DD4593DA25DC1630E798AC8 103866~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster STP resurfacing project. - 4TA7 (80% Federal) using TRC (15% Federal) and LNTP (5% Local Match) - Resurfacing Fai-CR 505-00.00 to 01.24 (Pierce Avenue).~|~05 - 4R Maintenance - Resurfacing~|~28055368B4ACF53C0ADDA1E6ED63B8BFDE7A2842 119166~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MRG-78-18.91-30.64.~|~05 - 4R Maintenance - Resurfacing~|~BE691B8B69E9388ECF4484B45F3C5922319D42FB 119166~|~1~|~2~|~02/NFA~|~Resurfacing project using an asphalt overlay treatment on MRG 607 0.00-1.68. Not on the federal aid system funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~6DC32F09230E8D125BD58DA632D0C18A0566A7EB 105336~|~1~|~1~|~01/STR~|~AC overlay without repairs on rural route: CLA US 42 SLM 0.00 to 4.44~|~05 - 4R Maintenance - Resurfacing~|~D0421708CBD95CB0E66125AED28E2813B0EB5593 120263~|~1~|~1~|~01/S>2~|~Plan split for federally eligible items in the construction contract subphase~|~10 - Bridge Replacement~|~783F97B0BF915BDE8E658E126169B10661303918 125937~|~1~|~1~|~01/SAE~|~Replacement of R-W/R markings. ~|~21 - Safety~|~BAA643C37FB5A72539644C0C76A3F8410F7A0D2F 116442~|~1~|~1~|~01/BRO~|~Replace structure HAS-519-0606 (SFN 3402894) with a new structure.~|~10 - Bridge Replacement~|~3A8CF54D5600549B97F50B084C5E6E0950CE4200 122287~|~1~|~1~|~01/STR~|~STP Rural State Bridge (<20 ft) Rehabilitation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0ACD7024BEB83ED57AEC878FBE0A3DAE62E235B4 122287~|~1~|~2~|~02/NHS~|~NHS State Bridge (<20 ft) Rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7406B1EB716DAD0187F4A3D6501162335B1C4644 123633~|~1~|~1~|~01/S>2~|~Plan split for STP > 200,000~|~05 - 4R Maintenance - Resurfacing~|~CFC8305D379936E32CF230D1E5B9BC33360D12A1 120048~|~1~|~1~|~01/NHS~|~Includes work on GRE-35-00008L/R Dayton / Xenia Rd bridges.~|~13 - Bridge Rehabilitation~|~E970C86642D9A767A7412E4E16EBCBCC070FBFCB 124334~|~1~|~1~|~01/SAF~|~Intersection improvement~|~21 - Safety~|~3854ACA118D0481DACDA543BB1484B35374BEED4 118136~|~1~|~1~|~01/MPO~|~MPO STBG funding~|~05 - 4R Maintenance - Resurfacing~|~5F3BCF8DECF4365D655ECFA14A296D68B5B31DAE 25496~|~1~|~1~|~01/S<2/NP~|~Urban system paving in the City of New Philadelphia; eligible items include asphalt pavement, long line pavement markings~|~05 - 4R Maintenance - Resurfacing~|~25ACBB047EE53DF9D0F48761F42C95F533694507 25496~|~1~|~3~|~03/NHS/NP~|~Urban system paving in the City of New Philadelphia; eligible items include asphalt pavement, long line pavement markings; NHS portions of SR 39/SR 800 at 80%/20%.~|~05 - 4R Maintenance - Resurfacing~|~64B3C60A3C63B14975BF4BBD556DB3F9F542E0EB 25496~|~2~|~2~|~02/S<2/NP~|~Urban system paving in the City of New Philadelphia on SR 39, 416 and 800; includes curb ramps, aux, pavement marking, loops~|~05 - 4R Maintenance - Resurfacing~|~75CFA653FEC16D7A78D5419162C7081CED929DB9 102923~|~1~|~1~|~01/STR~|~STP Rural funding.~|~13 - Bridge Rehabilitation~|~625A7278922911E404CAB4279AB96197EAB25C50 83843~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 724 0.00-1.30, NOB 260 0.00-1.90, 3.75-14.35, NOB 724 0.00-2.75, and NOB 761 0.00-1.90. Includes NOB 724 0189 (SFN 6105076).~|~05 - 4R Maintenance - Resurfacing~|~B6245B7119BF9AFAA14917DC14480B600A436BC9 121002~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 149 over abandoned railroad.~|~10 - Bridge Replacement~|~511DA89E730D2068B52CD1A6C25F177111BEBE6F 122197~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-A~|~~|~FA54FBC307A33F792EEC81F48066525F12F58490 122197~|~1~|~2~|~02/NFA~|~NEVI Round 2B I-71-A~|~~|~4FAD18FA7C5AEB654D45AC64E1A37BAAB3714392 96444~|~1~|~1~|~01/SAF~|~Tyre grip or micro surfacing of various portions of routes in project.~|~21 - Safety~|~229EBCDF12CC9285DF549F9351E8788A2D213276 83260~|~1~|~1~|~01/NHS~|~Bridge replacement project. WAS 550 2095. SFN 8402094. NHS route funded 80 federal/20 state.~|~10 - Bridge Replacement~|~6FD3A1C0AFEAB02FDE91DBEA2922404781D6A0AA 89424~|~1~|~1~|~01/S<2~|~ADA Ramp, mill and fill and base repair on John Street from fountain to yellow springs, Kenton from Burnett to East, mcCreight from Fountain to Plum, and Limestone from Pleasant to Spring.~|~05 - 4R Maintenance - Resurfacing~|~16AE609FF90F78C332EF983ED102313F4A67BEFB 98400~|~1~|~1~|~01/STR~|~ASD-095-1.46-13.5 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~28F110DCF146CFDDA228D155476500F499794E7E 89490~|~1~|~1~|~01/NFP~|~Construct noise wall on north side of IR-70 from US-33 to Big Walnut Creek~|~44 - Other~|~45F4C8E0BC6055B2302E0B0A5E208694BD59B63D 99877~|~1~|~1~|~01/S>2~|~Mill & fill East River Road.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F6045006FC9F529D4622D467B20E44A6C5EC33C 101554~|~1~|~1~|~01/STR~|~RIC-546-0.00 to 9.28 Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~22F0D7A90F030157A3FB9A6D8DEF4670DBBFB6C4 123872~|~1~|~1~|~01/MPO/ALLI~|~Signal upgrades.~|~21 - Safety~|~FBE7F69C682289B01E8CA0B9B0E40D2CC1BDC260 119248~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing of US42.~|~05 - 4R Maintenance - Resurfacing~|~0C625EEEBA060E382407892AA6869C0D9C3C2ADB 115178~|~1~|~1~|~01/S>2~|~Reconstruction of the existing roadway. Curbs, sidewalks, driveway approaches, and lighting, traffic signals, signage, pavement markings, and a buried interconnect will be rebuilt to replace existing. There will be minor storm sewer work including new manholes, catch basins, and some pipe replacement.~|~04 - Reconstruction - No Added Capacity~|~3B1284A971AA3D5DC99E54175CDEDC4F65F8CF02 115178~|~2~|~2~|~02/S>2~|~Construction of a new 12" water mains and the abandonment of the existing 10" water mains.~|~04 - Reconstruction - No Added Capacity~|~02753352BC0D5B8A38CA9E7B92D185E87375D92F 90640~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0BC3AEE65FD79FD0AD6C252BF87EBDCB3D40E9DD 111282~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project on ATH 682 4.70-6.07 and ATH 691 8.78-9.25 with an asphalt overlay treatment. Funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A6C00D6E8423AA01C62BA850E48CE22FEDA8F900 111282~|~1~|~2~|~02/STR~|~Two-lane resurfacing project. ATH 691 0.00-8.78 with an asphalt overlay treatment. Funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~184E001B76D9E86309983B18A11376D3855B4BB7 114803~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~6245BA21588EEB50248844B628A99F2154CC6A6E 114803~|~1~|~2~|~02/S>2~|~Columbus urban area plan split.~|~05 - 4R Maintenance - Resurfacing~|~67E2DD0BB7D018ED0C34603D4FA896DAAB1BF9CF 88718~|~1~|~1~|~01/STR~|~0103780 ADA SR247 8.82 Intersect: S Br Of Lick Fk Oh Brs CkBrdg Replacement 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~00019571885BC817C07825DFF529F4CD1D10837F 102668~|~1~|~1~|~01/S>2~|~Fine Graded Polymer AC Overlay on:WAR SR 63 SLM 0.85 to 0.86WAR SR 63 SLM 2.89 to 3.38WAR SR 741 SLM 3.66 to 6.05WAR SR 741 SLM 6.52 to 7.08AC overlay with repairs on:WAR SR 63 SLM 0.86 to 1.24WAR SR 63 SLM 1.24 to 2.89WAR SR 63 SLM 3.38 to 5.26AC overlay without repairs on:WAR SR 741 SLM 6.05 to 6.52~|~05 - 4R Maintenance - Resurfacing~|~9111468015C93A1A8AF3870B75DA6DBB08CD8DCD 102668~|~1~|~2~|~02/S>2~|~WAR-741-0494: SFN 8302345 over a Tributary of Little Muddy Creek. 1. Patch the wearing surface with concrete per Proposal Note 512, Type B. Include a note requiring to only repair portions of the wearing surface that are visibly spalled, patched with asphalt, patched with concrete, or are unsound AND contiguous with one of these areas. Do not patch areas that are unsound but are not visibly distressed. Include a quantity of 35 SY to be used as directed by the Engineer. 2. Retrofit the guardrail on the structure per DBR-3-11. 3. Replace the approach guardrail and end terminal assemblies to meet new MGS guardrail requirements.~|~13 - Bridge Rehabilitation~|~025F2CC321AA7F3EC1A103CC3178EE162139B39C 102668~|~1~|~3~|~03/SAF~|~Centerline rumble stripes.~|~21 - Safety~|~EE7F335B485216EE8533A855A4928A164C4BA780 102668~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~852F845C246225BEA110190310052E2879AC7448 101051~|~1~|~1~|~01/STR~|~Chip seal various routes in Auglaize and Logan Counties: AUG SR 29 SLM 6.40 to 9.67 = = AUG SR 197 SLM 5.16 to 7.44 = = LOG SR 508 SLM 1.29 to 9.46.~|~05 - 4R Maintenance - Resurfacing~|~9C4F10F5373B8E784DEE767DCAFEFBC6B147450F 101051~|~1~|~3~|~03/S<2~|~Chip seal various routes in Auglaize and Logan Counties: AUG SR 29 SLM 5.31 to 6.40 = = LOG SR 720 SLM 3.15 to 4.12.~|~05 - 4R Maintenance - Resurfacing~|~EA4037A624A1A21073E01013F8CF0A214B64E441 101051~|~1~|~2~|~02/NFA~|~Chip seal various routes in Auglaize and Logan Counties: AUG SR 720 SLM 0.00 to 2.81 = = LOG SR 720 SLM 0.00 to 3.15.~|~05 - 4R Maintenance - Resurfacing~|~B116313F3035F622B1BC4485602D06274CCA6D4D 114209~|~1~|~1~|~01/BRO~|~Replacement of Bridge No. CLE-CR 106-3.03 (SFN: 1359223)~|~10 - Bridge Replacement~|~C95C7331F07F94D6C14B8D92BC56523C06C55631 116429~|~1~|~1~|~01/MPO~|~Resurface Laskey from Monroe to Talmadge, omitting Flanders intersection.~|~05 - 4R Maintenance - Resurfacing~|~0B480015F34EAF62D31EF28FF22F67A49AF0C9B2 104099~|~1~|~1~|~01/STR~|~Split for bridge replacement at 80% federal and 20% state~|~10 - Bridge Replacement~|~01605021CB54A90C8BE2E8F94D55A510F1A6C405 120358~|~1~|~1~|~01/NFP~|~Systematic guardrail repairs/replacements and maintenance on various routes throughout District 4.~|~21 - Safety~|~DDCE6714D07786938407D0ABFC077E193B54C547 113070~|~1~|~1~|~01/STR~|~Crack sealing on:DAR-US-36 SLM 9.61 to 13.08DAR-US-127 SLM 9.50 to 9.69DAR-US-127 SLM 13.16 to 16.66DAR-SR-47 SLM 0.79 to 10.07DAR SR-49 SLM 0.00 to 12.19DAR-SR-571 SLM 13.65 to 24.88~|~99 - State Preventative Maintenance~|~5EBF507230B3F642A7EF82E740A7F7C7E195C8E3 109885~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2025. Funded 100% state.~|~21 - Safety~|~109373FB9962628DC3DCFA3062294788EA2E97C2 110818~|~1~|~1~|~01/NFP~|~ODNR Roadway Maintenance Program project to resurface the London Fish Hatchery~|~05 - 4R Maintenance - Resurfacing~|~1B002A9F109C1DC34A3B7C4363569AA84D739BCE 109759~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge cleaning and sweeping on Interstate bridges listed above.~|~47 - Bridge Preventive Maintenance~|~C13BC1363E8270FCE95F24AF365978CBC029A6E4 109759~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge cleaning and sweeping on NHS bridges listed above.~|~47 - Bridge Preventive Maintenance~|~0EEBF8E3E8C0D0DF3AEEF1AF7BF9160D74846A3D 109759~|~1~|~3~|~03/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge cleaning and sweeping on OFAH-Urban bridges listed above.~|~47 - Bridge Preventive Maintenance~|~68D568EE7A0420EF4DA27E1073787911B2815CE9 109759~|~1~|~4~|~04/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge cleaning and sweeping on OFAH-Rural bridges listed above.~|~47 - Bridge Preventive Maintenance~|~A6B125179BAFE7BC62FA2C32FB17C2945487F7F3 109759~|~1~|~5~|~05/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Bridge cleaning and sweeping on NOFAS-Rural bridges listed above.~|~47 - Bridge Preventive Maintenance~|~A2C4D5321F90076C55F8A56DFE5CF268B5394122 108398~|~1~|~1~|~01/NFP~|~Tree cutting plan split;~|~44 - Other~|~3250B0B1D10E2A966CC168312097C08CF4C527F4 101533~|~1~|~1~|~01/NHS~|~DSR# BEL-026~|~04 - Reconstruction - No Added Capacity~|~8FE6DFC4334936D90B468796A388455619B49E1E 93904~|~1~|~2~|~02/NFP~|~Reconstruction of East Xenia Drive, from just east of East Dayton Drive to the end of project, where the proposed side path meets existing.~|~28 - Facilities for Pedestrians & Bicycles~|~21DD071F062651DB4FAB3A2F6424B4B413838CB5 93904~|~1~|~1~|~01/CMQ~|~Construction of a 10 foot wide bike path to connect the existing bike path at Central Avenue and South Street, through Central Park and along railroad property to Xenia Drive. Bike path will cross the railroad tracks on the south side of Xenia Drive and will connect to the existing bike path located at the Calamityville property.~|~28 - Facilities for Pedestrians & Bicycles~|~74812FE777DA8A5ED29C1CA913380100E65C9D96 91327~|~1~|~1~|~01/NHS~|~Replace one bridge.~|~04 - Reconstruction - No Added Capacity~|~93EC1BE28D9B2747F14FC13EB256B311476CF446 107255~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 12.90. GSM funded. Not on any federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~32671D974474922ED4A323D2000B9DD803858985 96661~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. NOB 285 5.55-14.47. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~7D0DD5B909A2BC20D8D12FA1778921E3AF6BC361 84999~|~1~|~1~|~01/CMQ~|~ Install a traffic responsive closed-loop system consisting of new controllers, new system software, LEDs, and radio interconnect. The Central Avenue Corridor consists of six traffic signals. Central Avenue-Ohio Street to Broad Street in Fairborn~|~21 - Safety~|~13EC952A1422119900233E91AD2E9F6F8FE4EA33 86843~|~1~|~1~|~01/NHS~|~Add turn lanes at Central/Holland-Sylvania intersection.~|~21 - Safety~|~17B287868729F5D9B7350DCDA80D74D8C890F977 114493~|~1~|~1~|~01/NHS~|~FY26 Chipseal~|~05 - 4R Maintenance - Resurfacing~|~165A35394211A9B4EFB5C18FA2A35C16CB4B7E52 125684~|~1~|~1~|~01/NFP~|~Plan split for crack sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~01C5B31C982CBF1F04F6EBDB53E7EB92707F40F5 102867~|~1~|~1~|~01/NFP~|~All work in project. 100% state funds from the District Preservation Program budget. SAC 4PS7~|~04 - Reconstruction - No Added Capacity~|~E2F953ED3F79641F4E7B659AD726A2A67F9B3260 111354~|~1~|~1~|~01/NFP~|~Resurfacing in Hueston Woods State Park.~|~28 - Facilities for Pedestrians & Bicycles~|~4F75FDED622AA86ED1A20471D0F02A7183D2609F 95169~|~1~|~1~|~01/STR/PCEO~|~CEAO Funded 4B77 (80% Federal) / 4BG7 (20% Local) - Perry County resurfacing project of County Road 6 from 00.38 to 6.37.~|~05 - 4R Maintenance - Resurfacing~|~D00C759870446C38FFE7558C43539125BF4A5D38 96493~|~1~|~1~|~01/SAF~|~Widening of the two lane section of Yankee Road between Dutchland Parkway and Princeton Road to a three lane section. The intersection of Yankee Road and Princeton Road will be converted to a roundabout. A concrete sidewalk will be constructed along a portion of Yankee Road.~|~21 - Safety~|~66D723D920AE2169D927F7181B8A74512D855E94 92638~|~1~|~1~|~01/SAF~|~Modify the interchange at Intersate 275 & US-42~|~~|~7BF75CD8CD9D0FD9716FC3A6AD0C3265986F4AE9 115796~|~1~|~1~|~01/S<2/CAMB~|~"01/S>2/PV/CAMB" - 80% Federal (4B97), 15% TRC, 5% Local (LNTP) - reconstruction of Edgeworth Avenue from N 10th Street to Clark Street~|~~|~1DEA178EB68D5C76F7E96B2ED550D05D50778B30 115796~|~2~|~2~|~02/ENH/CAMB~|~"02/ENH/OT/CAMB" - 80% Federal (4B37), 15% TRC, 5% Local (LNTP) - enhancements along Edgeworth Avenue from N 10th Street to Clark Street - Initial Award amount capped $315,367 at 95%.~|~~|~A135DEDEF9BF1844D39165E95D7D03E2F2921D88 87302~|~1~|~1~|~01/STR~|~general system resurfacing of CAR-39-10.23 to 14.25; includes pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~17A938115B736ED459B3C02562089A2D283E78D0 101238~|~1~|~1~|~01/NFP~|~Cold Storage facility at the Dorset Outpost in Ashtabula County.~|~~|~51DF8AF1B06049115A8BAE940E1E405DDADAB872 104274~|~1~|~1~|~01/MPO~|~plan split~|~17 - Construction Engineering~|~0B348D861F42901C671A543B674EEF48B8797324 113598~|~1~|~1~|~01/NHS~|~Split for paving work on the NHS (west of SR-237)~|~05 - 4R Maintenance - Resurfacing~|~9BEE8EA3CFFB2AD925B6182701EBDAA47A705BA6 113598~|~1~|~2~|~02/S>2~|~Split for paving work on the STP system (East of SR-237)~|~05 - 4R Maintenance - Resurfacing~|~EFEEC795A34AA0AE95AC5A0EC3698B7E076A7248 113598~|~1~|~3~|~03/NFP~|~Split for 100% local items of work~|~05 - 4R Maintenance - Resurfacing~|~E2F90099F36B091E5C4EAE8056AE1FFAB6C7EB2E 109982~|~1~|~1~|~01/STR~|~Landslide repair project from OH2019-01, DSR WAS-001. Funds 80% Federal ER/20% State ER. WAS 555 5.55-5.64.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4F99E7DA0547C5D21E1946BE613E5DEAB05C331 115172~|~1~|~1~|~01/S>2~|~AC Overlay w/Rpr WAY SR 585 17.450 TO 18.469~|~05 - 4R Maintenance - Resurfacing~|~0381AE6B1B083CAD64E9A98B3232FAAD08BC9084 115172~|~1~|~2~|~02/S>2~|~Bridge Work to be determined later.~|~13 - Bridge Rehabilitation~|~1D7C702A7A9C72F13747B9268991F9D2376CDE36 101815~|~1~|~1~|~01/NHS~|~Bridge maintenance on 25 bridges on SR 126 in Hamilton County.~|~13 - Bridge Rehabilitation~|~C453F3EF12C42561D6B87BADED1ED78E77A06E36 98184~|~1~|~1~|~01/STR~|~STP Rural Paving 80/20 Fed/State PIC-188-1.44 to 1.68; 2.57 to 8.03~|~05 - 4R Maintenance - Resurfacing~|~86AF44D8418FC970C736BB82E7D989D103BA09F2 98184~|~1~|~2~|~02/S<2~|~STP Urban Paving Circleville 80/20 PIC-188-1.68 to 2.57~|~05 - 4R Maintenance - Resurfacing~|~908792CA38EAF029C42C71CC3546117D2D3C42AA 87588~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Crack sealing on Lic-IR 70-(15.96-29.42), Mus-IR 70-(00.00-01.46), Mus-IR 70-(13.12-27.35)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~662A68CBC7A8FD4B39EF177EA7B559AF21098076 87588~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Crack sealing on Fai-USR 22-(18.57-26.07), Mus-SR 93-(00.25-03.46), Per-USR 22-(00.00-06.77), Per-SR 93-(17.89-20.52), Per-SR 669-(00.00-06.34), Per-SR 669-(06.97-09.72)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A971E899F683155D76E9BA5C51AF0008B5FC7008 87588~|~1~|~4~|~04/S>2~|~"04/S>2/PV/ " - Disrtict Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing of Fai-SR 256-(05.99-06.54)~|~~|~C2ACB284ED59E425AEE1BE81BCC7A65364FFC923 87588~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - crack sealing portions of Fai-USR 33-(00.00-06.56), Mus-SR 93-(00.00-00.25), Mus-SR 93-(03.46-04.72), Per-SR 93-(20.52-25.99)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D1820A70AA656284016D757EDDE23D85BB3FFC27 102513~|~1~|~1~|~01/S>2~|~Repair and resurfacing FRA-315-12.91 to 13.80; DEL-315-0.00 to 0.90; DEL-315-1.77 to 2.69; DEL-315-2.83 to 4.07; DEL-315-8.41 to 8.56~|~05 - 4R Maintenance - Resurfacing~|~9CD8B0008CDA503B9EB1D36887BA25E7B085D934 102513~|~1~|~2~|~02/STR~|~Repair and resurfacing DEL-315-4.11 to 8.41~|~05 - 4R Maintenance - Resurfacing~|~BDDD6034024EFF39A06B55F0895240DA84228546 116332~|~1~|~1~|~01/NHS~|~Plan split for the pavement work on GRE-35~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~800391E00CEC8453069AA6B0C332DC81937785F2 87380~|~1~|~1~|~01/S<2~|~"01/S<2/PV/Steu" - 80% Federal/20% Local funding intended for non-intersection or non-CMAQ eligible plan items.~|~05 - 4R Maintenance - Resurfacing~|~B82311928FA49D2CF8DCD1B1BFC8D552892EFE8F 87380~|~3~|~3~|~03/CMQ~|~"03/CMQ/OT/Steu" - 100% CMAQ. Intended for all 100% CMAQ eligible items; lighting and signal work.~|~21 - Safety~|~DC42D4400C3A3C0D162789762C60F8985B1AA24E 87380~|~2~|~2~|~02/CMQ~|~"02/CMQ/OT/Steu" - 80% CMAQ/20% Local funding. Intended for those items that are CMAQ eligible, but not eligible for 100% CMAQ.~|~21 - Safety~|~FA416A36F76017E8753F2896B6AD2D84B7D647DD 115482~|~1~|~1~|~01/NFP~|~Split for non-PID related charges for PID 112423~|~17 - Construction Engineering~|~8CE921916D0C219A621E02051B7F5E6E1E12E280 109245~|~1~|~1~|~01/SAF~|~Guardrail upgrade project on various county routes and section in MOE County. Funded 100% federal.~|~21 - Safety~|~BB46919FC099E3DC570913C7D6EF834F4B05E990 122980~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~8B21DA7B13810A0856424F484CDFE1681D373992 97024~|~1~|~1~|~01/NFP~|~Paving at the Expo Center~|~44 - Other~|~FC83F634FF57440ADB97B31BF7F9F84EE54F4928 127033~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~5FB17606EAD7C31D80BD5C7C1CBB75961AB68673 111310~|~1~|~1~|~01/BRF~|~Muskingum County Engineer project to replace existing bridge on CR5 over Salt Creek (SFN 3033880). 4C87 - See Cap comments~|~~|~AF190A9746652C10D8C6EBFB8F4A4D2723B1AB10 106748~|~1~|~1~|~01/MPO~|~Work to install new sidewalks that is eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~8FF31EEB0ABA3B2EF8E521DB1169A3481AC329C1 116562~|~1~|~1~|~01/IMS~|~Plan split for bridge sealing on HAM-75 bridges~|~47 - Bridge Preventive Maintenance~|~8A90BF8F383742AC8A57AF392367ADB603F8FBBA 116562~|~1~|~2~|~02/IMS~|~Work on Major Bridge HAM-74-1908L/R and NC that carry I-74 L, R, and Center over the Mill Creek and railroads. Major Investment funds are used for these 3 bridges since they are Major Bridges.~|~17 - Construction Engineering~|~5C996D8F6A53C76B1D7452BF7776A4AC11CB4ED6 100295~|~1~|~1~|~01/STR~|~Landslide repair project. VIN 50 4.53-4.67. DSR VIN-002. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~02944865AAC63B98157969343E2497DFE96A6F11 115098~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D403EFFFAE0EC714FF8B2DE3013B283F198E28B4 115098~|~2~|~2~|~02/STR~|~Slide repair(s) by drilled shaft retaining walls.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE5DEC1CB389CBF61DBD9EC9FDDFAE247B2E8D6A 104113~|~1~|~1~|~01/SAF~|~Bridge Guardrail replacement along various routes throughout Stark County.~|~21 - Safety~|~B3151920C61BC83DA7E04523938AF528E50CD242 87940~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7 (80% Federal)/4PS7 (20% State) - No CAP - Length -27' SD(1) SR 65.0 DSR= 4 Treatment =Replacement of bridge 1602349 COS SR541 13.48 Intersect: Moscow Brook~|~10 - Bridge Replacement~|~93E20953663B380EE9F279C56F388D4260C86A37 100047~|~1~|~1~|~01/CMQ~|~Construction of a 10' shared use path from Fairbanks Avenue (near Boldface Park) to the Gilday Riverside Playfield.~|~~|~83670FFCAB6496F256A9C3CA34C8D711FBD130EC 93496~|~1~|~3~|~03/IMS~|~Bridge replacement - existing bridge width~|~10 - Bridge Replacement~|~16D14D3C3C21505FF8180BAEB06FEB693E7466F1 93496~|~1~|~4~|~04/NHS~|~Work due to widening of existing bridges~|~10 - Bridge Replacement~|~1B9CE93B82798167D9C0AD117C7E7892001277FB 93496~|~1~|~5~|~05/IMS~|~Remove trees and clean ditch to restore flap gate and ditch flow~|~04 - Reconstruction - No Added Capacity~|~5DD4FA2E8537F2F1E2165ECB2ACFCB2D0506BC3A 93496~|~1~|~1~|~01/IMS~|~Rehabilitation of existing pavement, SLM 1.41 to 1.83~|~04 - Reconstruction - No Added Capacity~|~539ACC748174A365D7D04C0D6A2FBC9723F43337 93496~|~1~|~2~|~02/NHS~|~Widening of existing pavement, SLM 1.41 to 1.78~|~03 - Reconstruction - Added Capacity~|~512AA9AE770897B2BBBE11FE82C5A1CE544A0D33 93496~|~1~|~6~|~06/IMS~|~Pavement Repairs of SLM 0.00 to 1.41 and 1.83 to 5.29~|~05 - 4R Maintenance - Resurfacing~|~5C635371700CF4BB7F66FE381FB0BB3C8A17C24F 93496~|~1~|~7~|~07/IMS~|~Repair damage caused by vehicle accidents~|~04 - Reconstruction - No Added Capacity~|~1CC4023DF97A9AF31FF0AAD3547F1D20801937BA 92055~|~1~|~1~|~01/ERD~|~Plan Split for TRU Warren Mahoningside Bikeway~|~28 - Facilities for Pedestrians & Bicycles~|~7AAA678C07F711966FC8F61B1E2389B19EF1D72A 105465~|~1~|~1~|~01/STR~|~MICROSURFACING DEL 229 FROM 7.44 TO 8.56.~|~05 - 4R Maintenance - Resurfacing~|~1780CAC94A61AEA80979DD59915F7881EE3C3966 105465~|~1~|~2~|~02/STR~|~PROGRAMMED PER 2-27-2017.XLS~|~17 - Construction Engineering~|~32D165B13967AEB7FB56F1041080505CE719CA7D 112471~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~F4A961C6E35ED30640A26824560E21D48EDD8AA6 107808~|~1~|~1~|~01/S<2~|~General System (Urban Area) Plan Split: UNI-4-14.06-14.88~|~05 - 4R Maintenance - Resurfacing~|~0AE8E2776EB1458F9516DD37C34DCBD91C72F636 107808~|~1~|~2~|~02/STR~|~General System (Rural) Split: UNI-4-14.88-24.35 UNI-37-5.30-5.83~|~05 - 4R Maintenance - Resurfacing~|~A2910F947D3129E729F97D3DBB7C62524C1C86C6 107808~|~1~|~3~|~03/S<2~|~Urban Paving Plan Split: UNI-4-13.61-14.06~|~05 - 4R Maintenance - Resurfacing~|~87E34C15C5B45E06E78CB04EF0509F15EF16111D 107808~|~1~|~4~|~04/SAF~|~Items associated with Center line Rumble stripes~|~21 - Safety~|~B27A014954D966EDD4EC7E93C60C0A22398F2019 105666~|~1~|~1~|~01/STR~|~PIK 104 3.17~|~04 - Reconstruction - No Added Capacity~|~53AAB7E6F85A1ACC5987C10D3310E11C5A5CC4A5 93793~|~1~|~1~|~01/NFP~|~100% 4PS7 funding for pilot lighting contract in FRA County01/NFP/OT/~|~44 - Other~|~1ECD18BAE19CEECB7085FFEE26A70146984A364D 113474~|~1~|~1~|~01/SAE/PICK~|~City of Pickerington SRTS Funding - 4HJ7 (100% Federal) - See CAP Comments - addition of sidewalks along Long Street and West Columbus Street.~|~21 - Safety~|~B5E35C04939E9030A346D9510236B84C3DF8D000 104009~|~1~|~1~|~01/SAF~|~Construct an RCUT design at the intersection of US 127 and Kruckeberg Rd.~|~21 - Safety~|~4886BE0A3261857114E00780EFCB94C8528B9BA7 109858~|~1~|~1~|~01/STR~|~Overlay on HIG 73.~|~05 - 4R Maintenance - Resurfacing~|~8EF8D26F13E37A78962672C4C017C372D6ACC269 87744~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~CA456B226E3F72EBAD1FB638B2A1750CC998C538 87744~|~1~|~2~|~02/NHS~|~Bridge work to be determined.~|~13 - Bridge Rehabilitation~|~843BC43E9BA3515864FEDD2C7D87CE7E4B4B7422 118647~|~1~|~1~|~01/S50~|~Shave/Pave and add pavement markings~|~05 - 4R Maintenance - Resurfacing~|~33ADD0FC274F6FA7267C81EC863C80739A57E3CE 98380~|~1~|~1~|~01/STR~|~Resurfacing POR SR 88 from 7.42 to 10.88~|~~|~FDECB742501032880E4F2A07F6B8363EA1E9BE58 98380~|~1~|~2~|~02/S<2~|~Resurfacing POR SR 88 from 10.88 to 11.13.~|~~|~DE07583EDCF8DCC7549C8CAB782753F483054657 98380~|~1~|~3~|~03/STR~|~See linked structures.~|~~|~F5C1C1C4B679EFD857FF4589C2A5282BB4C27A15 102595~|~1~|~1~|~01/STR~|~This project is to cover the federally mandated sign upgrades for rural curves on two lane roads.~|~21 - Safety~|~6A2F82BA8E7485B82CF0F655BE9260604AF3EBBD 95243~|~1~|~1~|~01/MPO/PORT~|~The PORT is construction a new access raod for Minova USA Inc., and their new facility being built within the Law. Co. Economic Development Corporations industrial park leading to Old County Road 1. The project consists of full depth roadway construction to include curbs and gutters. The PORT is the project manager and owner of the industrial park. This will be a locally managed proejct with the lead for the construciton being the PORT.~|~~|~BF1C835DD8049A917FDE5A85CCD1412155F6EF3F 118127~|~1~|~1~|~01/MPO~|~MPO STBG funds~|~05 - 4R Maintenance - Resurfacing~|~A995B5F43B01AF3C44F2CA579CEC6347053B3B52 96251~|~1~|~1~|~01/STR~|~100% 4PS7 - Construction Inspection~|~17 - Construction Engineering~|~3B3BA51478CFF68E70C33275FD9FC18321CC1153 115520~|~1~|~1~|~01/BRF/ASD~|~Bridge Replacement~|~10 - Bridge Replacement~|~B9AB2B865E02FF7DD04C028AEFA696618B48938C 102882~|~1~|~1~|~01/STR~|~STP rural pavement~|~05 - 4R Maintenance - Resurfacing~|~81836887FD18B371A2714E13C5254D1A8555B11C 97480~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 0.93. Type B Emergency. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4A7C82512494D82B167A2CDBD2951A0BCDC1D64D 119535~|~1~|~1~|~01/SAF~|~Offset right turn lane for Union Avenue. MEG 7 5.23-5.39.~|~21 - Safety~|~E9656ED4BD44DA3AA427ED1FAEDD8D05DA3AD69C 114949~|~1~|~1~|~01/STR~|~Box beam/deck replacement.~|~10 - Bridge Replacement~|~8153BEC1E4A8423278842E003A7BD9FD91477EB8 114958~|~1~|~1~|~01/STR~|~SDC bridge overlays and other various repairs.~|~13 - Bridge Rehabilitation~|~C5115B2964CC799C6D5539872C1138DB8CD39856 114958~|~1~|~2~|~02/S<2~|~SDC Bridge overlays and other various repairs.~|~13 - Bridge Rehabilitation~|~DD52CE39929B158C302F7CB6090FBCB2DCA0E6BB 120685~|~1~|~1~|~01/NFP~|~Tree Cutting on MEG 33 13.96-28.74. Funded 100% State.~|~20 - Environmental Only~|~951F412EB6B08B0662D85C10CE7B5748714DE22E 103818~|~1~|~1~|~01/MPO~|~Resurfacing of Portage Lakes Drive (CR 75).~|~05 - 4R Maintenance - Resurfacing~|~23E6C37E9E565568568D8EBA9C5CF567D53F65C1 95743~|~1~|~1~|~01/STR~|~SR-281 from SLM 9.91 to SLM 19.95~|~05 - 4R Maintenance - Resurfacing~|~0E96BE9EE88377155E3CAE6A48DC48B31210F1AC 101360~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. GAL 141 16.07-17.80. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2C5D92A720172E3D1C759B1F3F900370657DFA68 101360~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. GAL 141 17.80-21.44. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~EA544EA12F0741DABC0EB7C3E51AE34BB73AEE1F 107660~|~1~|~1~|~01/STR~|~Pavement repair on SR 49 using district preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~F3B138C4E3651677371DDD0A6F03DBD5F60EE67E 87230~|~1~|~1~|~01/STR~|~0102679 ADA SR73 6.41 Intersect: Crooked Creek 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~693EBB4E77B328BB258A2AE590FB7B98033A33A0 103814~|~1~|~1~|~01/SAF~|~District wide guardrail project to replace Type A anchor assemblies for FY2017. Locations TBD.~|~21 - Safety~|~015E5B7FF3674F42436E88F620472C898567F74D 98705~|~1~|~1~|~01/SAE~|~100% Sate Safety funds to improve the skid resistance at spot locations.~|~21 - Safety~|~B0A71C8E5C29FE228D02BB843A0CB67BF4D1D6D5 116501~|~1~|~1~|~01/NFA~|~Added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6DF728EA48014D34BDE020EB7DA0159C805D6A4C 116501~|~1~|~2~|~02/STR~|~Added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB755B3BFA8B1099180C786969CA1DDD2C3BBABE 110812~|~1~|~1~|~01/NFP~|~ODNR Roadway Maintenance Program Resurfacing of Mosquito Lake Road 1 in Mosquito State Park~|~~|~3CB09224658CB9DE22383FB170E5F91BC2C2E0DC 116703~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9ECF73361535A380D76743017936542A727F3177 98390~|~1~|~2~|~02/S<2~|~Resurfacing ATB SR 84 from 20.28 to 20.38 and SR 193 from 28.68 to 29.99.~|~05 - 4R Maintenance - Resurfacing~|~A02AAEA4C8262C159595902E820E6BB5800F6E2B 98390~|~1~|~1~|~01/STR~|~Resurfacing ATB US 6 from 25.18 to 29.95, ATB SR 84 from 20.38 to 21.80 and ATB SR 193 from 25.97 to 26.43.~|~05 - 4R Maintenance - Resurfacing~|~4C4D945EE7B34450A7C6DC44BC6E3807D6AEF338 98390~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~D8BFB8CACDD99908661DD3124A8ECD8E5BA7D177 98390~|~1~|~4~|~04/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~E9302448315490F66363BAF3F32304497DEA0042 98390~|~1~|~5~|~05/SAE~|~Adding rumble stripes.~|~21 - Safety~|~BEEB827B919A0B2F3635F6CE4E043417A1C445B9 93833~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: On SR134, located 1.30 miles north of US50. Project Description: It is proposed to replace the structure, SFN 3602710. 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~D48DACD0EEA75512C1CBCD6C3F4FD6AADC63DBEA 88816~|~1~|~1~|~01/NHS~|~Bridge Replacement~|~10 - Bridge Replacement~|~1FFC5D2E4A796669DB5E13B7B281CF9F85F7E5A8 98683~|~1~|~1~|~01/S<2~|~MCEWEN ROAD BRIDGE REHABILITATION. Rehabilitate existing 3-lane, 4-span slab bridge carrying McEwen Rd over Holes Creek. Remove and replace deteriorated slab edges, install new twin steel tube guardrail and steel drip strip full length on both sides. Jack and temporarily support slab end spans to allow reconstruction of deteriorated abutments on existing steel piles, in accordance with new ODOT SCD CPA-1-08. Remove and replace approach slabs upon completion of abutment reconstruction. Repair pier pile section loss at waterline and protect pier piles with concrete encasements.~|~13 - Bridge Rehabilitation~|~D003AB0816642225FAADF76F447ED4BE9F55A867 111370~|~1~|~1~|~01/SAF/KCEO~|~Knox County Engineer's FY2025 pavement marking project funded by CEAO. 4HB7 - see cap comments.~|~21 - Safety~|~AA94D4DBD3C283EFF4137B07E978A101BA112329 119680~|~1~|~1~|~01/SAF~|~Work associated with mid-block crossing of SR-28.~|~21 - Safety~|~67F177117DEB9EA69CAC8C1AE445E0AF843C447D 120129~|~1~|~1~|~01/S>2~|~Plan Split for STRS funding~|~28 - Facilities for Pedestrians & Bicycles~|~F2B09AC780157E88002B12F2264DF3CF272A128A 120129~|~1~|~2~|~02/NFP~|~Plan split non-eligible work items at 100% local cost.~|~28 - Facilities for Pedestrians & Bicycles~|~6A5ED7860E581FA9A631CE1B9D1AC3F081A6015B 123249~|~1~|~1~|~01/S5K~|~Traffic Signal Replacement~|~21 - Safety~|~D2FEDA2E95BD5290070FFEBD35D9180A124CD1B0 96684~|~1~|~1~|~01/ENH/PATA~|~City of Pataskala TA Project - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Installation of sidewalks along Taylor Road in the City of Pataskala~|~28 - Facilities for Pedestrians & Bicycles~|~718C5CE39E623C41AC3CCAEA0321379603F454F8 112784~|~1~|~1~|~01/NHS~|~Resurfacing of TRU US 62 from 5.64 to 9.02~|~~|~9F48002CB735A538CACD9D49AAA2DC52F958011F 112784~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span~|~~|~7ECF419EAA370854BB618A255545E6823DDD2777 121113~|~1~|~1~|~01/STR~|~Plan split for FUL-20A-22.89 culvert~|~04 - Reconstruction - No Added Capacity~|~3029FE850A6125577B0AE36FD5CA9361DC106A22 124994~|~1~|~1~|~01/S>2~|~Plan split for resurfacing STP Urban roadway~|~05 - 4R Maintenance - Resurfacing~|~DF136B70A79F0147501B8D8F05E3779FD6B7FC42 124994~|~1~|~2~|~02/STR~|~Plan split for resurfacing STP Rural roadway~|~05 - 4R Maintenance - Resurfacing~|~5BCA2052144BA198B648673F5AF685B321FA6D59 97129~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 13 2.69, SFN 0500135. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~898364AA8BC18C97007C7E578E31A9E17563D232 116356~|~1~|~1~|~01/STR/NEAL~|~City of New Albany's Funding - LNTP (100% Local) - No CAP Widening intersection enhancements to CR 41~|~~|~BC91E6B40FD6A81DB3C218F0DECAA3BAB5A6DE37 82861~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and overlay treatment. MEG 32 0.00-3.82. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~8E9BB3FB868259E87D8C11FA737790EA790A5755 125387~|~1~|~1~|~01/S5K~|~Resurfacing with related work on SR 188 in Fairfield County.~|~05 - 4R Maintenance - Resurfacing~|~3A9FADE2DF30913BBC2EB00C2425A783977E8872 114276~|~1~|~1~|~01/IMS~|~Mowing contract in District 8~|~44 - Other~|~959FEB366E81AA40BA8D4B78751D7DFB57A09B23 116050~|~1~|~1~|~01/IMS~|~Rehabilitation of culverts at various locations in District 5.~|~04 - Reconstruction - No Added Capacity~|~06E0F69460CC6E54B587940911F54D232FF7D05E 116050~|~1~|~2~|~02/NHS~|~Rehabilitation of culverts at various locations in District 5.~|~17 - Construction Engineering~|~BE943FA459FDA8535ABD75D1BFB171994B09339C 116050~|~1~|~3~|~03/S5K~|~Rehabilitation of culverts at various locations in District 5.~|~04 - Reconstruction - No Added Capacity~|~D6F7FF9FFDF035F83AB3D285AF4174C7310DAD4A 116050~|~1~|~4~|~04/STR~|~Rehabilitation of culverts at various locations in District 5.~|~17 - Construction Engineering~|~700E26A5F231BCE07B21AD7E6E2B5FE575481C40 83994~|~1~|~1~|~01/STR~|~general system resurfacing HOL-US 62 from Millersburg to Berlin; includes pavement, pavement repairs, pavement marking, shoulder repairs~|~05 - 4R Maintenance - Resurfacing~|~BFD1CFD297DA2D0AD3021E2FD445F206E7D27E1C 120504~|~1~|~1~|~01/BRO/Plym~|~Replacement of the Baseline Road bridge over the Ashland Railway RR~|~10 - Bridge Replacement~|~8FEBE787F8F974BC8F800541711E44A5E87A2715 111270~|~1~|~1~|~01/ENH~|~Muskingum Valley Park District approved TA project for construction of multi-use path from Dresden (TR-417, Rock Cut Road approx. 1.91) to Ellis Dam (TR-49, Ellis Dam Road approx. 0.57). 4B37 Enhancements - see Cap Comments~|~28 - Facilities for Pedestrians & Bicycles~|~A751D26F8641997245E440DA6265A8BF7929ECA3 75941~|~1~|~1~|~01/IMS~|~Microfurface IR 70 in Montgomery County:MOT IR 70 SLM 0.00 to 6.71~|~05 - 4R Maintenance - Resurfacing~|~22992A1F466A12B8D44BE6880CF5534570181AE3 125359~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A0A3F3D2AC58ECEC34DC808FA0077525166A1855 114708~|~1~|~1~|~01/NHS~|~Construction of noise walls.~|~20 - Environmental Only~|~1B434BC3FA7724CCD411F2AAB97516CA3E16DC3A 114708~|~2~|~2~|~02/IMS~|~Construct IR 80 Noise wall.~|~20 - Environmental Only~|~2417497DCDE41B9539203BAA33E32DDB70756AF9 114543~|~1~|~1~|~01/BRF~|~Replacing structure.~|~10 - Bridge Replacement~|~0D98EEAD4F005A07047253A6F75D70F99AA79EC8 95910~|~1~|~1~|~01/NFP~|~Removal of UFST~|~~|~EB56B353A8C50C5CD0B8533D573D6C3C786F585D 110500~|~1~|~1~|~01/SAF~|~Safety funded Plan split~|~21 - Safety~|~FC637E6FD6BD66958AB1297419FF27B2B97877B0 110500~|~2~|~2~|~02/NHS~|~Adding fuel price adjustment~|~21 - Safety~|~46F5A041F6925D526D13AAD4F343E49188AD7ADA 81250~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 6003664 MUS IR70 24.54 Intersect: CR 436 Moose Eye #; Not BR Eligible for Rehabilitation: Length=302 SD/FO(0) SR=88.9 DSR=8~|~~|~5F70A98278B3A5AF5CA37145D7BAF63139737D4B 92704~|~1~|~1~|~01/MPO~|~Resurfacing CR 7026 0.00 - 2.78~|~05 - 4R Maintenance - Resurfacing~|~3761D37904665B6115F6CAE7CE0F079F1096863F 84904~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~B38CE2045A91B1090545586626108D5D2ABE2E55 93155~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1602071 COS SR93 14.66 Intersect: White Eyes Creek; Not BR Eligible for Rehabilitation: Length=112 SD/FO(0) SR=97.8 DSR=6~|~13 - Bridge Rehabilitation~|~D4606A8DBEB68A2E3F571AEA05EFB838836B6A1E 84582~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% federal STP) / 4PS7 (20% state) - No cap - Bridge number WYA-53-2416, SFN 8801940.~|~10 - Bridge Replacement~|~D063B09C45C03E8B82A2C71CFD87E80F3A03C931 84582~|~2~|~2~|~02/BRO~|~District Preservation 4PF7/4PS7 (80/20) - No Cap - Bridge Number WYA-53-2185; SFN 8801924. This is for part 2 of the project. The design was done with WYA SR 53-21.85, PID 100734.~|~10 - Bridge Replacement~|~3A678C7DA2F5D9B611C2AFA2D20E38C1002DBFDE 95418~|~1~|~1~|~01/STR/ROS~|~Rural Portion: SLM 4.98 to 8.29 then 9.15 to 13.44 (Maple Grove Rd.)80/20 local match~|~05 - 4R Maintenance - Resurfacing~|~684310C96535774880D13BC9C0E9EADE6696F477 95418~|~1~|~2~|~02/S<2/ROS~|~Urban Portion: SLM 13.44 (Maple Grove Rd.) - 15.7380/20 local match~|~05 - 4R Maintenance - Resurfacing~|~232C4A4EB381A7D5D3C4C999625838FA0082D9DD 95725~|~1~|~2~|~02/NHS~|~Culvert at FUL-20-25.10~|~44 - Other~|~C09188D69A1E80D8FD771497B9CCC436A97995CC 95725~|~1~|~1~|~01/NHS~|~FUL-20 from SLM 13.54 to SLM 27.91~|~05 - 4R Maintenance - Resurfacing~|~845BFC60C3680352772C90759E7A12DEDBE4B5D9 95725~|~1~|~3~|~03/NHS~|~SFN 2600374~|~44 - Other~|~D5E94A4F8B6FF40A9618E68E1E307E157FA8358A 109068~|~1~|~1~|~01/NHS~|~Plan split SRTS~|~28 - Facilities for Pedestrians & Bicycles~|~36B838BAFF25E57F76E0E9EB0E3DAAB47D83D195 123737~|~1~|~1~|~01/STR~|~Plan split for resurfacing on rural general system~|~05 - 4R Maintenance - Resurfacing~|~AFB4A03FEDF77F96E5C15CE83A8F978284F81B11 116684~|~1~|~1~|~01/NHS~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~85906706E1FBBAD5CD017C902DBA58055B03B1AB 123400~|~1~|~1~|~01/STR~|~Rural~|~21 - Safety~|~8A63E909F51097042FF3BAC0D82D281B6868DF77 102810~|~1~|~1~|~01/NFP~|~Miscellaneous charges not eligible for project specific participation.~|~17 - Construction Engineering~|~D806C920449CA30AF716B3190C36201DB7217E19 98773~|~1~|~1~|~01/NFA~|~Replace SFN 7844891 Burnett East Road bridge over Sugar Creek.~|~10 - Bridge Replacement~|~2FEB7761A99FEDBD160D49C7CDA6D388257C4E88 95960~|~1~|~1~|~01/NFA~|~Ohio Rail Development Commission~|~44 - Other~|~57A6FDF1AA6DB06AAC4C28AB58A963F38475F88D 122404~|~1~|~1~|~01/IMS~|~All items of work associated with installing fiber and CCTV cameras along I-71.~|~24 - Traffic Management Engineering - HOV~|~B1DB979AF1D4ED017EE534C383241473C0119827 126581~|~1~|~1~|~01/STR~|~Primary plan split for CEAO funds~|~05 - 4R Maintenance - Resurfacing~|~5ECDF8CDE0986995397D3FE0803CE5E9194DD186 95503~|~1~|~2~|~02/STR/ALLC~|~Work outside the Delphos Urban Area. From the Delphos Urban Area Boundary at 0.60 to the end of the project at Baugh Road at 2.32. Federal MPO-STP funds with the non-federal match provided by the Allen County Engineer. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~1A8519A235B28A7CE02DD9DBA3F7EB73E6B03278 95503~|~1~|~1~|~01/S<2/ALLC~|~Work inside the Delphos Urban Area. From the beginning of the project at the City of Delphos Corporation Limits at 0.15 to the Delphos Urban Area Boundary at 0.60. Federal MPO-STP funds with the non-federal match provided by the Allen County Engineer. Urban STP funds.~|~05 - 4R Maintenance - Resurfacing~|~2E98D887A0C0BACF0EA52D3E7F3C5065D41D7449 111599~|~1~|~1~|~01/MPO~|~For federally eligible expenses in construction and CE of SAC 4TA7 (NOACA)~|~05 - 4R Maintenance - Resurfacing~|~B4E4119FD4B7B554580FE400B2997B684C56F0CC 125800~|~1~|~1~|~01/BRF~|~Bridge Replacement ~|~10 - Bridge Replacement~|~0307FA4B818B56FB3DAB490E6C6D29EA92D2A070 98492~|~1~|~1~|~01/STR~|~WAY-585-3.30-3.98 / 7.38-11.89 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~2BC3B74597FFEE8A7FA2DAB06499277B160F95EC 98492~|~1~|~3~|~03/S<2~|~WAY-585-2.20 to 2.38 - City of Wooster Urban Paving - 80/20 FED/City~|~05 - 4R Maintenance - Resurfacing~|~15DEBE782228C31AA19CEFA173707351ABCB6E4C 98492~|~1~|~4~|~04/S<2~|~WAY-585-2.20 to 2.38 - City of Wooster Urban Paving - 100% City~|~05 - 4R Maintenance - Resurfacing~|~514F088F96ECC73FFAD30FCCE506271A150D9B0A 98492~|~1~|~2~|~02/S<2~|~WAY-585-3.41 to 7.38 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8C8F1FCEEF842A85B73C3CB634080DCBE316DCE1 98492~|~1~|~5~|~05/STR~|~Bridge work~|~13 - Bridge Rehabilitation~|~9AAA97CC795EF2382B833943150F956FC990A25D 98492~|~1~|~6~|~06/S<2~|~Bridge Work for STP < 200000~|~13 - Bridge Rehabilitation~|~DA0FD157EA4468FF539DB479E1078EC8C725DACE 114946~|~1~|~1~|~01/IMS~|~Structural steel and bearing repairs.~|~13 - Bridge Rehabilitation~|~71B4F6226DD8C1FDC97B6AD74161DC4108644BEF 109768~|~1~|~1~|~01/NHS~|~AC overlay without repairs~|~17 - Construction Engineering~|~BD62EF7AC562A884936E36F6D65FAED6F12121F7 109768~|~1~|~2~|~02/STR~|~AC Overlay with repairs~|~17 - Construction Engineering~|~2940274394DDB854AACE31FB790F1DCA59193FBB 92669~|~1~|~1~|~01/MPO~|~Resurfacing CR 133 0.89 - 1.68~|~05 - 4R Maintenance - Resurfacing~|~5BA364D8DD67DBA2ED63DE391B0F9DF790CEC880 86833~|~1~|~2~|~02/S<2/Ox~|~Urban Paving for the City of Oxford in FY2013. This project will resurface a portion of SR 732 from Oxford Reily Rd (SLM 7.82) to the intersection of Main & Chestnut (SLM 8.69). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~5569FC8C34F3A160F1A220C3D849E80FEB16B361 86833~|~1~|~1~|~01/S<2/Ox~|~Urban Paving for the City of Oxford in FY2013. This project will resurface a portion of SR 732 from Oxford Reily Rd (SLM 7.82) to the intersection of Main & Chestnut (SLM 8.69). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~75CED54477650AB3ABD1254D69D69A73649CD601 92962~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation Pavement Marking 4MP7(100% State) - No CAP - Striping and Raised Pavement Marker costs due to resurfacing on PER SR757 0-5.68~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~12008BE3048AF445F0AA9A385F756419C9604F5B 92962~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on PER SR757 0-5.68~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~20D39D4DCAD57C62E207768883C3A4424F8B2A40 116475~|~1~|~1~|~01/NFA~|~Overlay in Highland County.~|~05 - 4R Maintenance - Resurfacing~|~23FE41F09156993B6997C0E8CFE369570D359DB2 116475~|~1~|~2~|~02/NFA~|~added BR plan split.~|~47 - Bridge Preventive Maintenance~|~7CDF870A6DA6B66B532C196DC9489F43EF6ADF7A 116303~|~1~|~1~|~01/S<2~|~Chipseal project.~|~05 - 4R Maintenance - Resurfacing~|~C75F534620BCF34D35A8F9E727F8D3DB0DA4DE78 116303~|~1~|~2~|~02/STR~|~Chipseal project.~|~05 - 4R Maintenance - Resurfacing~|~5B58043E170DBB5F1167706340B87F013E750DEC 116908~|~1~|~1~|~01/SAF~|~District-Wide raised pavement markers~|~21 - Safety~|~271D183C8D2A32CF21F195EB2F4261ACF1649F8B 116908~|~1~|~2~|~02/SAF~|~District-Wide raised pavement markers~|~17 - Construction Engineering~|~9BBAF2B2AF209D73D3239D313111443C9441AE5D 126047~|~1~|~1~|~01/STR~|~Eliminate roadway overtopping~|~66 - Resilience Improvement - Highway Project ~|~1E4A3DCB7D64A8416D94E79B460599F6387E62B6 97472~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-CR 31-W247(Rural Dale Road) SFN 6030181 - BR Eligible for replacement: L=33'; SD/FO=1; SR=65.9; DSR=4;~|~10 - Bridge Replacement~|~167A8AEA97390FA8346E7D3E93FDCE21F3DA6FCA 97472~|~3~|~3~|~03/BRF/GCEO~|~"03/BRF/BR/GCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - GUE-CR 366-646(County Road 366) SFN 3030814 - BR Eligible for replacement: L=29'; SD/FO=1; SR=40.8; DSR=N;~|~10 - Bridge Replacement~|~6B3939E0ABAB32E47D951D5AE2171E6640E5CA73 97472~|~2~|~2~|~02/BRF/MCEO~|~"02/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-CR 38-W128 (Hamby Hill Road) SFN 6043194 - BR Eligible for replacement: L=112'; SD/FO=1; SR=23.4; DSR=5;~|~10 - Bridge Replacement~|~A311F55CD67118173C785141257B746B650E262D 123222~|~1~|~1~|~01/STR~|~Landslide repair using a drilled shaft wall on ATH 329 12.31 and 13.26.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~642338D692499C0B6A3B159B5D509CDE27B321E2 114221~|~1~|~1~|~01/NHS~|~Minor bridge rehab > 20' span.~|~~|~CBDEFFAEE36D3F9638C2BABE8E1A9086F8CE9298 92616~|~1~|~1~|~01/IMS~|~Removal of ramps N & Q. Reconfigure Ramps P1 & S and signalize intersections at US 23. Add a deceleration lane on US 23. Pavement replacement on Ramps L, M, O, P1, & S~|~04 - Reconstruction - No Added Capacity~|~C0FC4ABCDB373A5A9E6A8B17FC55740278BEABD7 92616~|~1~|~3~|~03/NHS~|~Relocate City of Columbus Department of Power poles in both project parts~|~43 - Utilities~|~6E84EBC5EE030D8BC0C221BC8827E93454D3D6E0 92616~|~1~|~2~|~02/IMS~|~Work on two structures (FRA-270-5264 & FRA-23-0517)~|~13 - Bridge Rehabilitation~|~F3B1648A0E11FDEAA6A7EB3DF15EFC8F85163491 92616~|~2~|~4~|~04/NHS~|~Improvements to the intersection of US 23 at Rathmell Rd ~|~04 - Reconstruction - No Added Capacity~|~EF9809FAD6937D9BBEE4884E527A4426BC2BEB78 92616~|~2~|~5~|~05/NHS~|~Mill & fill US 23 SB from station 525+60.40 to station 546+47.41 ~|~05 - 4R Maintenance - Resurfacing~|~02AADA2528EF6D85F10DD0882BA254E7D668C6D3 109468~|~1~|~1~|~01/MPO~|~Reconstruction of Central Avenue from University Boulevard to Canal Street. Replacement of existing traffic signals, drainage improvements, and streetscape enhancements.~|~04 - Reconstruction - No Added Capacity~|~0C4203F0F601E901F1DA085351A46F2B0CBBA5A7 115495~|~1~|~1~|~01/NFP~|~Dead Ash tree removal across the district. ~|~44 - Other~|~C054EE01189C470C0583CD78A6BB20794118AEB4 95519~|~1~|~1~|~01/STR~|~Project to field pave the existing 84" x 66" CMP. MER SR 274 3.24.~|~~|~4BD9F7F278E163A3A7BA64BDD2CE24C688872E9C 104839~|~1~|~1~|~01/NFP~|~Split for sign/support upgrade work~|~99 - State Preventative Maintenance~|~CF363C9FFD37C478A953D44EF388C56399D4D0D0 104839~|~1~|~2~|~02/NFP~|~Split for sign support work due to vehicle collision. ~|~99 - State Preventative Maintenance~|~B366E8F8E921363FC7876E32C1A538BDB0E01B12 89420~|~1~|~1~|~01/STR~|~District Wide RPM contract.~|~44 - Other~|~F50ED733DB760E3A6973E527678A0CA1B9327A2C 116488~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~30B5DE748CA93439799D9257232EE9D34C6D3D1D 79662~|~1~|~1~|~01/NHS~|~Priority system resurfacing on FRA-33: SLM 26.12-31.23 (SR-317 to Fairfield County)01/NHS/PV/~|~05 - 4R Maintenance - Resurfacing~|~79D4B5E465E87C37B3BCA49D035E72B28561145F 79662~|~1~|~2~|~02/SAF~|~Turn lanes and prohibition of through movement at US 33/Bixby Rd intersection~|~21 - Safety~|~3BF4633742B4F75CD942C192A2C9C2592A736834 101200~|~1~|~1~|~01/SAE~|~Construct sidewalk on Riddle from Roberta Avenue to Springfield Pike (SR-4)~|~28 - Facilities for Pedestrians & Bicycles~|~0A23468A9E233D41454D7651128A0CEC64032F70 125505~|~1~|~1~|~01/IMS~|~Resurface Interstate routes~|~05 - 4R Maintenance - Resurfacing~|~82425596EE9824A1F114A575FE9F776DA8A583A7 125505~|~1~|~2~|~02/NHS~|~Resurface NHS~|~~|~FB853163E64163A9FAD9DA6B589A5A0633C81986 115675~|~1~|~1~|~01/NHS~|~All items of work associated with the Re-decking of structures UNI-33-9.10 L&R and UNI-33-11.50 L&R. This work includes MOT items of work and other miscellaneous items of work necessary to complete the bridge work.~|~13 - Bridge Rehabilitation~|~CD3E7595EB6122936E9FB857E45F416E45C94288 115675~|~2~|~2~|~02/NHS~|~All items of work associated with the Superstructure replacement for the UNI-33-785 R and UNI-33-786 L bridges.~|~13 - Bridge Rehabilitation~|~3D44B4EA84398D98B2DE84DDD40EB13EAAF2B6E2 115675~|~2~|~3~|~03/NHS~|~All items of work associated with the deck overlay on UNI-33-877 L&R Bridges.~|~13 - Bridge Rehabilitation~|~022C938EB5A3C8515DCF803ADE94B05A1E6E3ADD 115675~|~3~|~4~|~04/NHS~|~All items of work associated with guardrail work on NHS routes UNI-33 -7.55-12.60 and UNI-36 8.91-9.22~|~21 - Safety~|~4CD030A13EB032F64A9ABAF69CB68C8A525F76AB 94214~|~1~|~4~|~04/BRO~|~Bridge work funded with District Preservation funds.~|~13 - Bridge Rehabilitation~|~6E511FC60FC7C7BF757EE366F3ED990F2BE09D30 94214~|~2~|~6~|~06/BRO~|~Work to rehabilitee the bridges over CR 33 and the abandoned railroad. Design under PID 104095. Funds from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~7AB035A7DCE6074AB5F0F888EC7E3B30660899A1 94214~|~1~|~2~|~02/IMS~|~Work associated with the approximately one mile of reconstruction from SLM 16.71 to 17.71 on I-75. Major Rehab funds will be used first. If additional funds are needed District Preservation Program funds will be used.~|~04 - Reconstruction - No Added Capacity~|~E483D5F8785FED5DAB8A06E5F5726652A3D93CBA 94214~|~1~|~1~|~01/SAF~|~Safety improvements to the southbound entrance ramps of the I-75 and SR 696 interchange as well as the barrier in the area that is being reconstructed. Funding from the Safety Program will be used first until the cap is reached. If funds needed over the Safety Program cap Major Rehab funds will be used. Last if needed will be District Preservation Program funds.~|~21 - Safety~|~78D31184D51CD3F03AFCFAFED3B88A6B92595AEF 94214~|~2~|~7~|~07/IMS~|~Pavement work using funds from the District Preservation Program budget on IR75 from the bridge over Riley Creek in Allen County to just south of SR235 in Hancock County. Also resurface the ramps at SR 103. Design under PID 104095~|~05 - 4R Maintenance - Resurfacing~|~A6FD30EEE0B1054972C5248FCF01ABC624381FE4 94214~|~2~|~8~|~08/SAF~|~Installation of cable barrier on IR75 in Hancock County from approximately SLM 1.29 (CR33/RR Overpass) to approximately SLM 2.79 (start of the mound). Funding from the Safety Program until the cap is reached. District Preservation Program funds will be used after the cap is reached. Design under PID 104095.~|~21 - Safety~|~9FF72A76564AE8E38EB7C734FB749B7BDAA4C79A 94214~|~1~|~5~|~05/SAE~|~Traffic Signals at the top of the ramps at the interchange of SR 696 and I-75. Funding is 100% federal funds from the District Preservation Program budget.~|~21 - Safety~|~44965D3AEDC6EEC30383B3C000CDFFF14CFB6E59 94214~|~1~|~3~|~03/IMS~|~For all pavement work not associated with the approximately one mile of reconstruction in plan split 2. All funds will be from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~D72BEF4473957E924BA7F5DD02AA9AF593EEF17E 94214~|~1~|~9~|~09/NFP~|~Guardrail damage caused by an uninsured motorist. The District will compensate the contractor for the repairs but we have to use a part code that has 100% state funds as the FHWA will no participate in damage repair due to an uninsured motorist.~|~21 - Safety~|~815C606DE2AF79BCD438257970AB5992DF8FF2D3 89035~|~1~|~1~|~01/CMQ~|~All items of work eligible for CMAQ funding~|~~|~73A07C2CB35D7BDB3B97583A6A6CC03459EEFB26 97025~|~1~|~1~|~01/NFP~|~Resurfacing and other work at Ohio Expo Center~|~44 - Other~|~C076DB09738C5DFFC99D6F7B8AEC242A50D0E207 103629~|~1~|~1~|~01/S<2~|~ER slope repair. DSR BEL-009.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D3EB6546B3BBEC08F97D207D4E98725FC58CA9A2 104227~|~1~|~1~|~01/NFP~|~plan split~|~44 - Other~|~D623283FE04B59E43ADB98E3DDCCA7B9E13BF21A 119132~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment. VIN 32 0.00-7.67.~|~05 - 4R Maintenance - Resurfacing~|~0054135D39186ACF9C588A50FE0FB39F55225DF4 108005~|~1~|~1~|~01/S>2~|~Split for resurfacing in the villages~|~05 - 4R Maintenance - Resurfacing~|~C4F66DB9C49A4929A2731FAA760966661623D899 108005~|~1~|~2~|~02/S>2~|~Split 2 for urban paving resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~92C1482D13BE2C44C6BD8E459E7A4223FC4311F1 95793~|~1~|~1~|~01/STR~|~from SLM 10.09 to SLM 13.82~|~05 - 4R Maintenance - Resurfacing~|~383277BF6B8DA652644E580566E52AF04D8297AD 95793~|~1~|~2~|~02/STR~|~SFN 8601275~|~13 - Bridge Rehabilitation~|~CE4BA51D5B4240E5C2E50EFC09E975EC61888A1B 120027~|~1~|~1~|~01/NFP~|~added plan split. ~|~05 - 4R Maintenance - Resurfacing~|~71C82409E1C8685DBA6878BBACD620FA895EEAC9 124115~|~1~|~1~|~01/BRF~|~All bridge replacement work included in this split.~|~10 - Bridge Replacement~|~46747A043F0DC51625432CB85B286B0B5B7CE0CD 113963~|~1~|~1~|~01/NFP~|~Work on various culverts. District preservation funds.~|~~|~29B651EFA17763045BEBB1619B92A405D195B02F 113963~|~1~|~2~|~02/NFP~|~Work on a culvert that meets the state but not the federal definition of a bridge. District preservation funds.~|~~|~BD1717A45BD055E3E86DDD8FF2BFAE636EA9086B 88043~|~1~|~1~|~01/SAE~|~This plan split is for the traffic signal and railroad construction flagging and pre-emption equipment. These funds are from the safety program.~|~21 - Safety~|~54BB0302BB2FFD269AC19EDB76ACC36F7713000C 88043~|~1~|~3~|~03/S<2~|~This plan split covers resurfacing pay items (surface and intermediate courses, pavement planing, and lane line pavement marking).~|~21 - Safety~|~93F0A782BA557322E5F53475F0346D4A12CD9FDF 88043~|~1~|~2~|~02/CMQ~|~This plan split is for the roadway work items other than the traffic signal, resurfacing and railroad preemption equipment.~|~21 - Safety~|~C6C652CA0C66B0EEBCF77AD987DE1EEE734FADEC 123643~|~1~|~1~|~01/IMS~|~Plan split for guardrail replacement work~|~21 - Safety~|~12ED893C41E4A5AD567DFC06876AF1CFA998A9C0 123643~|~1~|~2~|~02/IMS~|~Plan split for guardrail maintenance and repair~|~21 - Safety~|~194C5F09D23494B7CF23FEA46B34BF36B3F88A38 102497~|~1~|~1~|~01/NFP~|~District Preservation Conduit Funding - 4PS7 (100% State) - No CAP - Culvert repairs for conduits in District 5~|~04 - Reconstruction - No Added Capacity~|~297B611CDAB504ED7AF51DC042935C4BCC98117B 105769~|~1~|~1~|~01/IMS~|~Plan split for painting work in the interstate system~|~47 - Bridge Preventive Maintenance~|~B63E392C0C77731E17EF5D9EB89EAD8802CE1AA1 112410~|~1~|~1~|~01/IMS~|~AC overlay with repairs on: SHAMIR00075**C 16.42 16.69 SHAMIR00075**C 16.69 16.94 SHAMIR00075**C 16.94 17.23 SHAMIR00075**C 17.23 17.47~|~05 - 4R Maintenance - Resurfacing~|~89D182C3EDCA9AF637AFD09FCD8577C7B637F8B8 102146~|~1~|~1~|~01/STR~|~Bridge replacement PIK SR 220 3.29 (SFN 6602223)~|~10 - Bridge Replacement~|~6F320350FE2D47D661652072FD667BFD06535E94 102146~|~1~|~2~|~02/NFP~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~B536AD4AC5DCF70FD93A6F31DF462DEC8AA37196 125875~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~33230C2050594EC33F16D64B072E7B4651D0BEA6 125875~|~1~|~2~|~02/NHS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~833B553FFB308C102223BFB6E1BE61C0D5D0683D 103509~|~1~|~1~|~01/STR~|~DSR# BEL-006~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68539E9FE3A4F47CE7853FCF39BCC9E11692503C 111653~|~1~|~1~|~01/NHS~|~Slide repair LAW-52-17.57~|~04 - Reconstruction - No Added Capacity~|~6EEC0179E7378FA3148E6BB5972E12B88C1A97BA 114054~|~1~|~2~|~02/STR~|~All work to widen and resurface CR Old SR 12. 80% federal and 20% local until the cap is reached then 100% local funds.~|~04 - Reconstruction - No Added Capacity~|~99469E97C48294CDB04F0530C5757A536F26B2CC 114054~|~1~|~1~|~01/NFA~|~All work to widen and resurface on CR 18S and CR 19 which are not on the federal aid system. ~|~04 - Reconstruction - No Added Capacity~|~2EDB46459013EDA6E2BF103967637AD9E0C1EB76 102122~|~1~|~1~|~01/NHS~|~AWT~|~~|~5F6C86F6B3B21C991D142649EEBD5B55F24B9285 104842~|~1~|~1~|~01/MPO~|~Resurfacing Hills & Dales Rd (CR 98) from Massillon East Corp Limit to Brunnerdale Ave.~|~05 - 4R Maintenance - Resurfacing~|~A51663E893A7C2A70FB3D62B5F82C80A6A60527C 88769~|~1~|~2~|~02/S<2~|~Remove and replace structure on SFN 1903365 DAR SR 571 1382 (Bridge Creek)~|~10 - Bridge Replacement~|~19E59F496131009893E8850FAFDFB1640E37CB27 88769~|~1~|~1~|~01/STR~|~Remove and replace the sructure on SFN 1903489 DAR SR 571 1571 dividing branch.~|~10 - Bridge Replacement~|~DF7C34B09AB771F3E5ADE4F20CCC544E1D067217 117926~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-A~|~63 - Electric Vehicles & Charging Infrastructure~|~7719C1B16F84EB7D4537ECE7CB27BEBB5AE50E81 108262~|~1~|~1~|~01/STR~|~ER slide repair PIK CR 66 2.12.~|~04 - Reconstruction - No Added Capacity~|~762CB2E5769346548D552BA86BBA9F1CBEC9100A 114611~|~1~|~1~|~01/NFP~|~Plan split for pavement markings~|~21 - Safety~|~2784DFC014F0B18564F97706804CC291711586B0 104155~|~1~|~1~|~01/STR~|~PIK 772 13.77 Slide repair.~|~04 - Reconstruction - No Added Capacity~|~981173ACE4749E1233741728028309DC984B12FE 86661~|~2~|~5~|~05/BRO~|~Bridge work on five structures at 80/20:SFN 2500876 - FRA-23D-2.82 (Third St over Goodale St and N/S RR)SFN 2500868 - FRA-23D-2.95 (I 670 WB to Third St SB ramp over N/S RR)SFN 2500833 - FRA-23D-3.17 (Third St over Nationwide Blvd)SFN 2500663 - FRA-23-12.11 (Fourth St over NS RR, Conv Center Conn, Third St ramp)SFN 2506149 - FRA-23-12.12 (Ramp to 670 EB over NS RR)~|~13 - Bridge Rehabilitation~|~05C8D943C16641BBDD4B24DDF8589A0B4741D67A 86661~|~2~|~7~|~07/S>2/Cols~|~100% Columbus funded items: curb ramps and pvmt repair~|~05 - 4R Maintenance - Resurfacing~|~288BF69CD34E5DB1C199AB59F481E3DF55E6B1B1 86661~|~2~|~3~|~03/NHS~|~Columbus urban paving of FRA-23 12.11 to 15.31 (Fourth St from EB ramp to IR 670 to Hudson St and Hudson St from Fourth St to Indianola Ave); FRA-23D 0.00 to 3.26 (Summit/Third St from Hudson St to Chestnut St)~|~05 - 4R Maintenance - Resurfacing~|~4EA5FC8A4E55F2A3E82E50193CAC6DE2E03A1726 86661~|~2~|~4~|~04/BRO~|~Bridge work on on structure at 90/10 - SFN 2500914 - FRA-23D-2.70 (Third St over I-670)~|~13 - Bridge Rehabilitation~|~582478B22F896EF3C89FE07A07AC865A1F335A61 86661~|~1~|~2~|~02/S>2/Cols~|~100% Columbus funded items: Paving Rich St, curb ramps, pvmt repair and signal work~|~05 - 4R Maintenance - Resurfacing~|~830A201198EC84A414A5BE54E4E49333006C32D5 86661~|~1~|~1~|~01/NHS~|~Columbus urban paving of FRA-23 10.83 to 12.11 (Fourth from Fulton to EB ramp to IR 670) and FRA-23D 3.26 to 4.25 (Third from Chestnut to Fulton)~|~05 - 4R Maintenance - Resurfacing~|~B2060F7EBC55E7FE146921640AC4563FC66DEFB1 86661~|~2~|~6~|~06/SAF~|~Safety funding for road diet items on Summit and Fourth St from Hudson to I-670: signal items, signing, possibly striping if outside urban paving striping~|~21 - Safety~|~BB638E81A1486FE2BFCEE43162EFB5C3D8475F09 86661~|~1~|~8~|~08/S>2~|~District Preservation funding (100% State) for signal work at Mound/Third intersection by change order~|~21 - Safety~|~200D15E1F9E6E7C2F9B4B53A6B55DEC4BF50BEC2 118665~|~1~|~1~|~01/SAF~|~Intersection improvement project. ~|~21 - Safety~|~1D4551A8F6DF6D93A5D0AEB142FB817AF8E5B308 119164~|~1~|~1~|~01/STR~|~Chip seal project.~|~05 - 4R Maintenance - Resurfacing~|~6993A1B5FF11809EC164AC83EADC6F95F9466DE7 96439~|~1~|~1~|~01/NHS~|~Remove center raised median and replace with single sloped concrete barrier on MOT US 35 10.32 to 14.41~|~21 - Safety~|~50E055E5F7F735D5EF4923C60C033F99B43F4931 114011~|~1~|~1~|~01/SAF~|~JAC CR VAR PM FY26.~|~21 - Safety~|~99E5298AC1306E2BC1096C923134C4CD2812DD8C 83723~|~1~|~3~|~03/IMS~|~ This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of the work originally to be completed under PID 76257. Project adds a lane to I-75 from the Monmouth overpass to just south of Clifton Rd.and reconfigures the I-74/75 interchange. Multi-Lane portion of project~|~~|~2FCF7437A35934D6BB997C492958670B1724F798 83723~|~1~|~1~|~01/IMS~|~ This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of the work originally to be completed under PID 76257. Project adds a lane to I-75 from the Monmouth overpass to just south of Clifton Rd. and reconfigures the I-74/75 interchange. Major-New portion of the work~|~~|~50C7B01607EB79DD1FB0157A45F6B3B2EB49B1F8 83723~|~1~|~2~|~02/IMS~|~ This is Phase 5 of the Hamilton 75 corridor projects. This phase was split off of the work originally to be completed under PID 76257. Project adds a lane to I-75 from the Monmouth overpass to just south of Clifton Rd.and reconfigures the I-74/75 interchange. Bridge portion of the project.~|~~|~EF3791518FA5A6141B120C1ABD9C9933F6F97E31 122989~|~1~|~1~|~01/MPO~|~Compton Rd Sidewalk ~|~28 - Facilities for Pedestrians & Bicycles~|~3B7EB833F6B650C6236D671B3DEA4C34436E02AD 117402~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items~|~10 - Bridge Replacement~|~D12C8BB528F6B669D7D7A2233EDA7C3E7DD8898D 112821~|~1~|~1~|~01/NFA~|~Plan split for the eligible construction and construction inspection costs of replacing SFN 4734114~|~10 - Bridge Replacement~|~BA3086D1759A556AF75A7A7E4EFA9881A58723C6 93189~|~1~|~1~|~01/STR~|~Remove and replace existing overlays (Latex and Microsilica) with new latex modified concrete deck overlay system, and and necessary patching on: SFN 0602736 SUG 197 0510 over ST Marys River~|~13 - Bridge Rehabilitation~|~099EF45EA7C8C92D0B56FB4BB4FCD8B96CFDC1E0 93189~|~1~|~2~|~02/NFA~|~Remove and replace existing overlays (Latex and Microsilica) with new latex modified concrete deck overlay system, and and necessary patching on: SFN 0602523 AUG 116 0822 over St Marys River~|~13 - Bridge Rehabilitation~|~1F4200BA6AFF5C9572A7A33BCE7424B7413434C2 97600~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation Bridge Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Emergency repair of the approach, expansion joint and backwall on Gue-IR 70-09.94L bridge (SFN #3001350) over IR 77.~|~13 - Bridge Rehabilitation~|~883F2D5791774230C01FC6E1918FC2B8E24BF48A 97888~|~1~|~1~|~01/MPO~|~Construct multi-pupose trail utilizing MPO funds.~|~28 - Facilities for Pedestrians & Bicycles~|~F7F8F1303B53F57005AD6ACE0583923FBD70080A 101522~|~1~|~1~|~01/STR~|~Prevailing wage tree cutting contract.~|~44 - Other~|~25143B8147F5E4E1228230D3142B9D756CB2106A 121869~|~1~|~1~|~01/SAE/HUR~|~Installation of guardrail on various Huron County roads~|~21 - Safety~|~57A110BCED432640A257F766FA7C6103355A8F2C 104634~|~1~|~1~|~01/MPO~|~Resurfacing West Market Street from SR 5/82 interchange to Lovers Lane in Warren Township.~|~05 - 4R Maintenance - Resurfacing~|~A042BB6563761418E62396E30F308BEB064A355B 125780~|~1~|~1~|~01/NHS~|~Plan split for NHS work locations~|~04 - Reconstruction - No Added Capacity~|~8F2C5E110515E8A605613E939CFCCC15A58F4702 125780~|~1~|~2~|~02/S>2~|~Large urban work locations~|~04 - Reconstruction - No Added Capacity~|~7DF975B9A07020B580F869A4DB1F127A75461E24 125780~|~1~|~3~|~03/STR~|~Rural work locations~|~04 - Reconstruction - No Added Capacity~|~68034C704426DC20742412C149322779C997621F 113824~|~1~|~1~|~01/IMS~|~Split for work to replace the culvert~|~44 - Other~|~6490C2116C52B75F964CEA6F6E7FD93EDB82854E 87044~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY 2015. 100% State.~|~21 - Safety~|~D93BF741E8511C34C891EF11D3E5DD158CAA38F5 92545~|~1~|~2~|~02/STR~|~Resurface the existing roadway. along with other roadway related items within village of N. Lewisburg of S.R. 245 CHP 245 20.05 to 21.61, WCL of N Lewisburg to ECL of N Lewisburg.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4F5F432CC12E1744B1CDD689722C36B40323EE5C 92545~|~1~|~1~|~01/STR~|~Repair of curb and gutter, sidewalk, tree lawn and other roadway related items on SHE SR 274 from SLM 15.24 to 16.58 and on CHP SR 245 from SLM 20.05 to 21.61.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDBC9126BE8ADB90F6A8FB7D5C443895A3738BFF 115859~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 39 2.025, SFN 5331366. ~|~10 - Bridge Replacement~|~F88C87895F1A97017CC973152363C5D1D5C617BF 116923~|~1~|~1~|~01/BRO~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~2B5529B01B78F732F6998D393D5EE3AE5F4D817E 98052~|~1~|~3~|~03/IMS/CNN~|~test~|~05 - 4R Maintenance - Resurfacing~|~DEE281EBFE38BFC7E7699F40424D27118627A673 98052~|~1~|~4~|~04/ENH~|~test~|~~|~CC703120BF62D62C2D69B37EA71618E215786E4E 98052~|~1~|~2~|~02/ENH~|~test~|~01 - New Construction~|~798DD0AB56D2C6A6AAD90E2F6E8C0B9EB62B1867 98052~|~1~|~6~|~06/IMS~|~test~|~~|~5014F7A6136C26DABD3E926CA87AE5C617BDAA25 98052~|~1~|~5~|~05/ENH/CNN~|~Test only~|~~|~187328ECCAAEEDA6DF68B207F114C7F8E78EEF0A 98052~|~1~|~7~|~07/IMS~|~test~|~~|~0FBCD79D61AA1DD237EB6174BBD1891F82CCB6A5 98052~|~1~|~1~|~01/IMS~|~test~|~~|~DA5ADEEB6FEAA5777A2C46595AB836B54890E97A 98867~|~1~|~1~|~01/MPO~|~Lighting and Sidewalk improvements on multiple city streets.~|~21 - Safety~|~AB0AABF9B4BB0147BABD5761F14C611E5FC00C85 102531~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation - 4PF7 (80%)/4PS7 (20%) - No CAP - Replacement of two box culverts located at MUS-60-0.30 and MUS-60-0.90.~|~~|~19CB12F55DE429DAF22DC417DB43F4D5FD6AABD9 105349~|~1~|~1~|~01/BRO~|~Construction of the new Western Hills Viaduct including constructing tower piers, approach bridge substructure, construction of large span and approach span superstructures and decks and remaining approach roadway.~|~08 - Bridge - New Construction~|~67A9745B69E70180AEFB39F4B4CCC0544BEDEDEC 117640~|~1~|~1~|~01/ENH~|~Streetscape improvement project including addition of dedicated bicycle lane utilizing Federal TAP (4B37) funds at 95%.~|~28 - Facilities for Pedestrians & Bicycles~|~01096F9A2349DF36EA943FA562935394FF451EEB 117640~|~2~|~2~|~02/S5K~|~Water and Sanitary work utilizing Non-Federal funding. ~|~43 - Utilities~|~FDE2DCC65D9F9E7CF0DEB7448301D194EDDC62F9 116660~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs RIC-71-15.455 to 20.636~|~05 - 4R Maintenance - Resurfacing~|~2E2D9413C028489513D339ECB324D4212CC18459 124923~|~1~|~1~|~01/STR~|~Culvert replacement project. ~|~17 - Construction Engineering~|~A8AE1A6541F4F9FB3D6CCE85044DC0250F9627D2 100464~|~1~|~1~|~01/NHS~|~Installation of pedestrian amenities, including construction of bumpouts; repair of sidewalks, curbs, driveway approaches and curb ramps; and installation of amenities such as trash receptacles and benches.~|~28 - Facilities for Pedestrians & Bicycles~|~05F4334BEB40391C18CA94CEAB98EB926948027E 125188~|~1~|~1~|~01/SAF~|~Sign replacements~|~21 - Safety~|~69F03F0586995ED3D8DC0504B93822F7CEE4443A 122486~|~1~|~1~|~01/SAF~|~Install roundabout.~|~21 - Safety~|~5C97E1C98A6B87A0A355EF5C96D86E9B097AD02B 110363~|~1~|~1~|~01/STR~|~HIG 134 11.24-13.99 & 14.06-18.78~|~05 - 4R Maintenance - Resurfacing~|~AAD166597CF8D9DB1B1C2F2FE61446F101E6EF5E 110363~|~1~|~2~|~02/STR~|~Bridge PM.100% state due to bridge length.~|~47 - Bridge Preventive Maintenance~|~BDB0ABF25694D03DA9B4A325689BD7F749C0440C 114957~|~1~|~1~|~01/S>2~|~Replace Structure~|~04 - Reconstruction - No Added Capacity~|~AA41438479F15ECA39221A00C7B144235640A9B2 118005~|~1~|~1~|~01/SAF~|~Convert signalized intersection into single-lane roundabout at HUR-4-8.02/SR 113 (Safety Funds)~|~21 - Safety~|~ECA35899D23CD8F9EBAEEB05872905BB39A3238B 118005~|~1~|~2~|~02/NFA~|~Waterline work paid 100% by Northern Ohio Rural Water.~|~21 - Safety~|~E6AC2F324955A4628E59E41885714AF6673808D2 118005~|~1~|~3~|~03/NFA~|~Waterline work for Erie County.~|~21 - Safety~|~2C67ECBF33B5F79F48E2EE0EABD8C22F504F2E3A 120563~|~1~|~1~|~01/STR~|~Pier encasement on COS-36-13.89~|~47 - Bridge Preventive Maintenance~|~818E9E807CBF50F66CBE1CF6DDCAE414F426FFE9 104755~|~1~|~1~|~01/IMS~|~District Culvert Funding 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Culvert Repairs on: 1) GUE IR 70 21.92; 2) GUE IR 70 23.42; 3) GUE IR 77 3.81;~|~10 - Bridge Replacement~|~AB43C746FE7297346C855E2C0B858814320EA530 92484~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project on GAL CR 68 (Peniel Rd). Begin at the community of Peniel (CR 76) and end at CR 134 (Cadmus Rd). 100% Federal (Forest Hwy Funds).~|~05 - 4R Maintenance - Resurfacing~|~92FB77058FF16E5419A7681AB73660A0AF3A9883 92484~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project on GAL CR 68 (Peniel Rd). Begin at the community of Peniel (CR 76) and end at CR 134 (Cadmus Rd). 100% Local.~|~05 - 4R Maintenance - Resurfacing~|~F200ED300C562F19BE42E19A5FDCDAD4C2991404 85627~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~9488A1AA7C269BB4C0936FDFA1A651C183AD7830 113095~|~1~|~1~|~01/STR~|~Resurfacing of STA SR 44 from 19.39 to 23.21.~|~~|~0E7762B89CD3146030A28BD00115027A9C1F09A5 86462~|~1~|~1~|~01/NHS~|~Consolidate and manage access points to establish relocated SR 32 a controlled access arterial roadway west of IR 275, including coordination for accommodation of multi-modal components; Oasis rail corridor, bikeway corridor, a new interchange at US 50/Red Bank/SR 32 in Fairfax, a multi-modal clear span crossing of the Little Miami River and associated multi modal transit hubs (at US 50 and at Newtown Road).~|~~|~0E6043BF81E14DCEE774A9254F3FD7B40EDAEE1B 108952~|~1~|~1~|~01/NFP~|~Plan split for Paving for Hayes site~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~DF658175DC899D227706B4F84B4F5937E10E60BD 117913~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-74-A~|~44 - Other~|~9CA96716EC705B6D1EA53652731E83CDBC6C1373 121436~|~1~|~1~|~01/NFP~|~Pavement repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68F304B504F63936610A47D5638F8113E206BE62 119002~|~1~|~1~|~01/BRF/TRCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~18835A20FA446E87F1A196189C378B2C387382E1 118097~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds to resurface~|~05 - 4R Maintenance - Resurfacing~|~093D738F3AB89C911E7F0C9192923A8B9BBC20D2 121173~|~1~|~1~|~01/NFP~|~crack sealing plan split.~|~99 - State Preventative Maintenance~|~7F5E51B532895E766D701532560F062DEAD440C4 111654~|~1~|~1~|~01/S50/NEWA~|~City of Newark Local Program Municipal Bridge Funding - 4R87 (80% Federal) / 4BG7 (15% TRC) /4BG7 (5% Local) - See CAP Comments - Funding to replace SFN 4560418 (Moull Street - CR 813) and SFN 4560426 (Jefferson Street - MR 491) over Log Pond Run~|~10 - Bridge Replacement~|~AF991598444584C0F79F3A5735969C4B9EA1FCE2 102989~|~1~|~1~|~01/STR~|~Bridge replacement project on MEG 124 59.70, SFN 5301920. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~EDB96FC4AA4EC136DA40AF40F0EEA761D3BDCB6E 118794~|~1~|~1~|~01/BRO~|~Work for Bridge Rehabilitation. ~|~47 - Bridge Preventive Maintenance~|~208A2641079D991AECE83FFEC42A09F7E6EB5B76 115032~|~1~|~1~|~01/S<2~|~RIC SR 0314 02.75-Culvert Replacement.~|~04 - Reconstruction - No Added Capacity~|~6E3EF1FDBC58C892AB5DDC442FE31371E0386BF5 124028~|~1~|~1~|~01/NHS~|~Plan split for embankment stabilization along NHS route with GSM funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~28732DBB5049B8CD26B8E83D4F4C95478B17B952 124028~|~1~|~2~|~02/NHS~|~Plan split for conduit repair on NHS route~|~04 - Reconstruction - No Added Capacity~|~AD782CEEDC1180F3F163845AAD35E066DECEBFFD 106026~|~1~|~1~|~01/STR~|~Replace culvert: BUT-126-0885.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EDBC3EB2CBB6EA16C6F67BA7C0ACBE122B2ADF7F 106026~|~1~|~2~|~02/NHS~|~Pave culvert: HAM-52-3729~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BE77B5BCF6C98556096EC6E74A2C8EA8FE88FDD1 106026~|~1~|~3~|~03/IMS~|~Pave culvert: HAM-74-1121. Cure in place liner for small culvert: HAM-74-1396.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7EADF85706E68B9640C54DF4D839557F9AF539C1 106026~|~1~|~4~|~04/S>2~|~Pave culvert: BUT-747-0530.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~967034FEC2F062E9346F9343D02D9AFE6D5A1713 112482~|~1~|~1~|~01/S>2~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~A400B40276F72B1140A1465D296EBA5A04EE23A9 112482~|~1~|~2~|~02/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~7A6001B6D4781E191039B1C8AE2CE8E9C4A41142 103504~|~1~|~1~|~01/ERD~|~Horizontal curve correction to mitigate crashes.~|~21 - Safety~|~F019EAD4B29EB4C24434E4C0252D516000E5012A 88837~|~1~|~1~|~01/NHS~|~This split is for resurfacing on the NHS system. The bond funds SAC 7BPB should be used before the regular District Preservation Program budget funds federal SAC 4PF7and state SAC 4PS7. All three SAC are District funds. The bond funds SAC 7BPB are capped.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~794F10A07F1D5E7837A32B94AF7BA8278475D488 114156~|~1~|~1~|~01/STR~|~Culvert replacement project.~|~04 - Reconstruction - No Added Capacity~|~316ADC90FBAC9A1D70513A8E3F1D4E05A1D7029A 101478~|~1~|~1~|~01/BRO~|~This split is for all work associated with bridges PAU-114-12.42 and PAU-114-16.80; SAC's 4PF7 and 4PS7.~|~10 - Bridge Replacement~|~63C8BEBCA5C437AD467B3614CC258D8B38E35DEC 22714~|~1~|~2~|~02/BRO~|~The funding event is for relocating a water pipeline that is necessary because of the project which includes the removal of a bridge (BEL-147-0961, SFN 0703427)~|~10 - Bridge Replacement~|~5A1E0E238A3074F56E31CFA9D7A803EBE5D299A4 22714~|~1~|~1~|~01/BRO~|~Remove existing bridge BEL-147-0961 (SFN 0703427) and replace with embankment.~|~10 - Bridge Replacement~|~7BEAE43E4CD6DDE783E2F34BF956C7A58BA7A2A6 123733~|~1~|~1~|~01/IMS~|~Plan split for Interstate~|~05 - 4R Maintenance - Resurfacing~|~DDB4293DCE7454B0D66B0C1E31693865EC4621B2 102552~|~1~|~1~|~01/NHS~|~District-wide culvert replacement program. Locations TBD.~|~17 - Construction Engineering~|~D587EBD5E98F903BBF8B78E750555F953574E688 117401~|~1~|~1~|~01/MPO/NILE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1086DAA2C5F905D39E1003F7AB9EF9ED5A3CA40F 117935~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-90-A 218-241~|~63 - Electric Vehicles & Charging Infrastructure~|~7757C93CE4328E2B0022981D51A60E8699A3294F 93125~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrial Upgrade on: 1) Mus-US 22-00.31 to 01.16; 2) Mus-SR 93-00.25 to 03.45;~|~21 - Safety~|~482E151C824C8E98352DAE0A6179EAC970D058E9 93125~|~1~|~2~|~02/S<2~|~"02/S<2/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail Upgrade on: 1) Mus-US 40-09.40 to 09.59;~|~21 - Safety~|~680746605C48046B5C626EFA74A82CDFEA219382 93125~|~1~|~3~|~03/NHS~|~"03/NHS/OT/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail Upgrade on: 1) Mus-US 22-01.16 to 07.49; 2) Mus-US 40-09.59 to 10.23; 3) Mus-SR 93-00.01 to 00.25; 4) Mus-SR 93-03.45 to 04.40; 5) Per-SR 93-26.01 to 26.82;~|~21 - Safety~|~BA19CE1CCC52E3A783616FC9BE19541175151479 115157~|~1~|~1~|~01/ENH~|~Construction of a 0.21 mile long section of recreational trail. Work includes installing a 12 foot wide asphalt path, widened sidewalk along Webster St., a small retaining all, benches, trash cans, and pavement striping.~|~28 - Facilities for Pedestrians & Bicycles~|~A1F50F893DD1DB2F360F79EDC80166F518E0F8D6 103810~|~1~|~1~|~01/MPO~|~Rehab SFN 2536064~|~13 - Bridge Rehabilitation~|~A4BA974E85673A924499C486E1D3CE949285CBEC 126922~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of major bridge for work including new superstructure and deck.~|~16 - Right of Way~|~8669C7335078D755BDCFB4B1EC5621B58274194C 96725~|~1~|~1~|~01/NFA~|~Stark County Garage, addition to back of garage to gain vehicle storage space or building 6 Bay Cold Storage along back fence.~|~~|~D7220007DEFF3FA6F2883CD12E33C1F21FE65640 103438~|~1~|~1~|~01/STR~|~AC overlay on MRW-42 and MRW-61 FGPO on MRW-314~|~05 - 4R Maintenance - Resurfacing~|~6A2B314C973EA75E3E6D5C10B0840A3B13C45FBA 103438~|~1~|~2~|~02/STR~|~Items to be paid 100% by Mt Gilead~|~05 - 4R Maintenance - Resurfacing~|~49EA33900DCF2749A5AC84AB420791E2723718C7 90246~|~1~|~1~|~01/BRO~|~Replace FRA-40/Main St bridge 2502828 FRA US40 21.35 Intersect: Big Walnut Creek~|~10 - Bridge Replacement~|~D521F43F3C79C4540E1EADD6803A987CCB5FD0D3 91720~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 553 0.00-2.33. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~62058F6A7907A44D087291FF435062B24A059FC6 119955~|~1~|~1~|~01/STR~|~added plan split.~|~10 - Bridge Replacement~|~41182B321BDB4C5EAFFE062E36053685E565660B 84581~|~1~|~1~|~01/NHS~|~Bridge Maintenance/Repair~|~13 - Bridge Rehabilitation~|~810F69BDDB15B5973980CC6E5DDAF93A2FFCB78C 95741~|~1~|~1~|~01/STR~|~STP rural pavements - FDR funds then District Alloc funds.~|~04 - Reconstruction - No Added Capacity~|~E59DC9242328403D4A868800282B222DCD00B2A6 119997~|~1~|~1~|~01/S>2~|~Big Walnut Trail from Refugee Road to East Main St~|~28 - Facilities for Pedestrians & Bicycles~|~9AB0EB6985A0406B5618506D074258C1391C1F10 100869~|~1~|~1~|~01/NHS~|~SCI 52 0.00-8.67~|~05 - 4R Maintenance - Resurfacing~|~B5E20FB61334DE902D093C93692307C6E958922D 100869~|~1~|~2~|~02/NHS~|~SCI 52 0.84 (SFN 7300425)SCI 52 1.28 (SFN 7300492)SCI 52 2.80 (SFN 7300557)SCI 52 6.73 (SFN 7300581)~|~47 - Bridge Preventive Maintenance~|~1028BCDF56EB9173F3E2C983A2886F9AFAE4F7D8 96794~|~1~|~1~|~01/STR~|~General System Resurfacing including Pavement Repairs and Pavement Markings on HOL-62.~|~05 - 4R Maintenance - Resurfacing~|~437D4CA414A6534F571B7664D18BA9F51240E25E 93945~|~1~|~1~|~01/NFA~|~District wide pavement markings. D09 Auxiliary Markings (A) 100% State ~|~21 - Safety~|~F10DAF358ABF579FFC86FDE94D8F4DE9A94C1307 110452~|~1~|~1~|~01/SAE~|~Upgrade traffic signals at the intersections of CLE-125 & Amelia-Olive Branch Road, HAM-27 & Round Top Road, HAM-27 & Virginia Avenue, and BUT-4 & Grand Boulevard.~|~21 - Safety~|~28A850988ABE7F759BBA27E901D25E57982637A5 106672~|~1~|~1~|~01/MPO/ERI~|~Active Transportation program~|~28 - Facilities for Pedestrians & Bicycles~|~6F2DE7DD26C7AF53307920F4EC49087BE6457C28 97029~|~1~|~1~|~01/NFP~|~Split 1~|~01 - New Construction~|~97A98204C748E7CB2F2E13BA59108C035BA71F27 88551~|~1~|~1~|~01/S<2~|~Milling of existing roadway and resurface with Asphalt Concrete on MER US 127 from the junction of US 127 (SLM 12.45 to Celina's East Corporation limit (SLM 13.37) . Urban Paving Program~|~05 - 4R Maintenance - Resurfacing~|~3200B344A9714197CCB66ABC6B1E6073ADA9F897 125240~|~1~|~1~|~01/MPO~|~City of Hamilton EV projects 2026~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~ED89B80912044B285E958F0B9BADDA2B29474729 120349~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~51E6245A2D34F644EABC07E1F94F85ACB2A82A9A 126898~|~1~|~1~|~01/NFP~|~Plan split for sign replacement and repair at known locations with 100% state preservation~|~21 - Safety~|~D474770076A5329365B16F856A9BBF858A13C180 101288~|~1~|~1~|~01/STR~|~WIL-34 from SLM 0.00 to 6.35~|~05 - 4R Maintenance - Resurfacing~|~D0D63C4F8DE1DE93A1E485ECE6A8B8893B3FD77E 94295~|~1~|~1~|~01/NFP~|~Construct a mixing shed at the GAL M&R Garage. Non federal aid project funded 100% state (LBP7).~|~44 - Other~|~5276994EACEFB75A40B47A35CCAB3F796BAF4F48 100171~|~1~|~1~|~01/S>2~|~Widen roadway from 2 lanes to 2 thru lanes and center turn lane, add sidewalk.~|~04 - Reconstruction - No Added Capacity~|~BFA2228301A0AECB590278A015B31CF28EF1A275 100171~|~1~|~2~|~02/S>2~|~100% local items.~|~~|~68C8AB635E2524A888CF0B889ABE4098B1D5659C 79842~|~1~|~1~|~01/MPO~|~Pavement widening~|~05 - 4R Maintenance - Resurfacing~|~A93638E2EFD859EB35EAAFBAA615F99812E85990 115987~|~1~|~1~|~01/NHS~|~Perform backwall and approach slab patching on six structure on US 23~|~13 - Bridge Rehabilitation~|~CBD77B99D646540A98BC486A4E7CE8FE87BAED85 119255~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing of UNI-347.~|~05 - 4R Maintenance - Resurfacing~|~363E2ABD54080CDB11D449EC5916A3A9EC7D3CDC 109935~|~1~|~1~|~01/NFP~|~Lighting improvements at ATB IR90 TIC/Rest Area.~|~44 - Other~|~4924E3C3DDDBF26F1B2ABCDB548B30F5F8ED990F 109905~|~1~|~1~|~01/STR~|~Resurfacing SR 149~|~05 - 4R Maintenance - Resurfacing~|~B274615FFAF139A3E406A34FF75479C0BCDE6566 110419~|~1~|~1~|~01/S>2~|~FY23 Urban Paving on SR 63 and US 42 in the City of Lebanon.~|~05 - 4R Maintenance - Resurfacing~|~F1021FC65A45EE9FC7620421C08C9CE740262BD2 110419~|~1~|~2~|~02/S>2/LEB~|~This plan split is for items that are not eligible for the urban paving program on SR 63 and US 42.~|~05 - 4R Maintenance - Resurfacing~|~AD99D45651E4EFE87FB2BFB79AC7F4C8AE0C6AFD 102572~|~1~|~1~|~01/IMS~|~FRA-40-6.27 (2512270) damage repair~|~13 - Bridge Rehabilitation~|~E5AF240C3D0D35AB4AB6E1155390591E91FED161 88799~|~1~|~1~|~01/NHS~|~Seal bridge deck with SRS and painting existing structural steel beams on SFN 0600296 AUG US 33 1284, SFN 0600202 AUG US 33 0269 R, SFN 0601144 AUG US 66 1273, SFN 0600199 AUG US 33 0212 L, and SFN 0600288 AUG US 33 0929.~|~13 - Bridge Rehabilitation~|~B62E809DAE89D6E728FEF7FA7C9702E515DA18B8 88799~|~1~|~2~|~02/IMS~|~Seal bridge deck with SRS, and painting existing structural steel beams on SFN 0602310 AUG UR 75 0876.~|~13 - Bridge Rehabilitation~|~E1A6484BC48B978B8025B85897D112982E12D906 95320~|~1~|~1~|~01/CMQ~|~Extension of Marietta River Trail Bike/Ped path, approximately 0.83 miles beginning at Jefferson Street and ending at Cogswell Lane. A new bridge crossing will be provided over Duck Creek downstream of the existing Pike Street bridge. Funded 80 federal/20 local.~|~28 - Facilities for Pedestrians & Bicycles~|~ED61535DEC1A7DAAF0E957AD892578FC7A2D7AC3 120037~|~1~|~1~|~01/S5K~|~Intersection Improvement~|~21 - Safety~|~66CD719C30BD23E85AA4103C671DC839FBD96BF0 126831~|~1~|~1~|~01/MPO~|~Created Plan Split for new project.~|~05 - 4R Maintenance - Resurfacing~|~C6F72181B1C68EA9F657F0B18A48A6D9409F96DA 87217~|~1~|~1~|~01/BRO~|~4402979 LAW SR217 5.72 Intersect: Symmes Creek 100% state 01/BRO/BR/State~|~10 - Bridge Replacement~|~DD220454164C06E50A4E02D034FF593AB7B68B87 83937~|~1~|~1~|~01/NFA~|~3630773 HIG CR11 17.43 Intersect: Bull Creek CEAO 80 Fed/20 Local Match Highland County 01/NFA/BR/High~|~10 - Bridge Replacement~|~65F9066ECFF1852F1EDB5FB4200CD338BF16EBA6 103720~|~1~|~1~|~01/S>2~|~Intersection improvement at MAH SR 46 and Mahoning Avenue. Includes adding exclusive right turn lane on the eastbound approach of Mahoning Avenue; add northbound lane to create two through lanes in addition to an exclusive left and right; reconstruct the signal and add back plates; reduce the speed limit on Mahoning Avenue from 45 MPH to 35 MPH west of SR 46.~|~21 - Safety~|~B06C35B92A26FB13640634D69730A5E22DC93392 94043~|~1~|~1~|~01/IMS~|~Annual district mowing contract~|~44 - Other~|~49B5F59354DBECB8D9EE365C336DE4994A9D2AF0 116246~|~1~|~1~|~01/IMS~|~Conduit replacement at multiple locations.~|~04 - Reconstruction - No Added Capacity~|~E074CC277B97B6232FE73DEE32C50B55CA9D5E1C 108557~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH CR 20 8.89. DSR ATH-009. Rural other federal aid funded 80 federal/20 local ER funds.~|~~|~D14C4D4B98EADEEC43514EE658827EFE60C17694 98585~|~1~|~1~|~01/CMQ/PCE~|~Widening of County Route 18 (Tallmadge Road) and Mogadore Road in Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~205136BCFC23B9A1969CEAF43EB93A2F3CE7C31D 98585~|~1~|~2~|~02/CMQ~|~Widening of Eastbound and Westbound ramps along IR76 at CR-18 interchange in Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~C490274BEFD63678076A41AAAC0F2310F1E58F0C 98585~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~185E2DD5AB2682D15560DE67E53EB1607A2DFAE8 84570~|~1~|~1~|~01/S>2~|~Plan Split for SUM SR 91 from 1.42 to 1.81~|~~|~86172B954DA47B56455D96562DFA78995F7939A9 104084~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project. Concrete joint repair. MEG 33 24.31-27.69. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~8704E668890538630A8DACEC2374D29CD53C6D54 109638~|~1~|~1~|~01/IMS~|~Resurfacing BEL-470~|~05 - 4R Maintenance - Resurfacing~|~665DFF5C2EF2EE6409746AB4D29CF64CCC004767 102795~|~1~|~1~|~01/STR~|~Applying chip seal to various STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~5AE580010697F729AB5014AF4D07609365D3E9C9 102795~|~1~|~2~|~02/NFA~|~programmed by Matt Rotar per the request of Heidi Mertler of CO to account for routes not on federal aide system~|~05 - 4R Maintenance - Resurfacing~|~E10DE11055BA505704A0E4A98A9858242C368703 97206~|~1~|~1~|~01/SAF~|~Upgrade signals at the following locations: GRE-35-5.036 @ Orchard; GRE-35-6.238 @ Valley; HAM-50-1.05 @ Lawrenceburg~|~21 - Safety~|~4E37CB0F2857F56813E3AD3E0AF497CDC87BAF99 104673~|~1~|~1~|~01/IMS~|~Seal FRA-270/1856L/R bridge decks and parapet repairs.~|~13 - Bridge Rehabilitation~|~783BF56BDF0CE9FD2B041E6C8E263F3BFFB3BCAD 104673~|~1~|~2~|~02/IMS~|~Seal FRA-270-5353 L/R bridge decks~|~13 - Bridge Rehabilitation~|~FB02E71E206A792EE1EDDD73EDADD89A7665E6AE 99365~|~1~|~1~|~01/NFP~|~"01/NFP/CV/ " - ODNR Parks Project - 4BF7 (100% State) - No CAP - Repair of 6 drain pipes at various locations within Salt Fork State Park.~|~44 - Other~|~1AE0C60C1BB3587D6BC3783CD5EE0775DA88B0BF 107762~|~1~|~1~|~01/SAE~|~100% HSIP funds from the CEAO. Guardrail is eligible for 100% federal funds. Funds needed over the CEAO cap will be provided by Allen County.~|~21 - Safety~|~5F5F6BA967542C1FDAE8ABF309D243D3BFEA9E7A 103099~|~1~|~1~|~01/STR~|~Plan Split created for FY22 culvert work~|~~|~347F39A0FE529932DE34C0D10E5A748ECA1F0BC1 103099~|~1~|~2~|~02/IMS~|~Plan split created for culvert work at FRA-270-7.40~|~44 - Other~|~32FFFC3C4F3D4AC023A3E2D71DAB41E67493F46F 119765~|~1~|~1~|~01/SAF~|~Various pedestrian safety improvements (pavement markings, curb ramp, RRFBs, etc.) throughout the City of Monroe.~|~28 - Facilities for Pedestrians & Bicycles~|~903CAB64E8773825EAB0A9EC220536AFD12AB29C 88863~|~1~|~2~|~02/NHS~|~Crack sealing at several locations on: MAR 23 14.93-19.97 PIC 23 0.00-5.21~|~05 - 4R Maintenance - Resurfacing~|~4EBBDD18B2B1D03815F16B4557F401FE86258A39 88863~|~1~|~1~|~01/STR~|~Crack sealing at various locations on:DEL 42 0.00-3.25FAY-41-0.00-10.37FAY 41 15.48-29.15MAD 40 6.66-7.90MRW 61-3.27-8.00MRW 61 14.13-22.86~|~05 - 4R Maintenance - Resurfacing~|~1728136600877256DBE119D7569F3D6E14A6DD55 88863~|~1~|~3~|~03/S>2~|~Cracksealing DEL 42 3.25 to 4.27~|~05 - 4R Maintenance - Resurfacing~|~AC1FDFDE5B6A656481ADAE8B1D43191921D7981B 88863~|~1~|~4~|~04/S<2~|~Crack sealing FAY 41 10.37 to 10.62 and FAY 41 14.38 to 15.48~|~05 - 4R Maintenance - Resurfacing~|~DEDD7E560C728C750DFE3282FA40E04AB00A5ADE 122051~|~1~|~1~|~01/ENH~|~Reuse of historical bridge on the Pickaway Trail over Yellowbud Creek and Lick Run.~|~28 - Facilities for Pedestrians & Bicycles~|~0590BC87E0C3F07C92233CCF316DC57F3BE579D4 118672~|~1~|~1~|~01/MPO/HCEO~|~Improvements to the intersections of Fields Ertel Road with Conrey and McCauly.~|~21 - Safety~|~05A40D756B9F61E3E84350F0FEF75EFB6AB6D523 106651~|~1~|~1~|~01/S<2~|~SCI 73 23.01~|~04 - Reconstruction - No Added Capacity~|~2FE61342CD5F3818305DDABBA294607A796EF502 117094~|~1~|~1~|~01/SAF~|~Intersection improvement~|~21 - Safety~|~250CFDC2A2C5F896482872BA7F66E75A374BAF47 101320~|~1~|~1~|~01/NHS~|~CO CO Contr 01 plan split 1 created for the following NHS routes: FRA-33-0.00-0.32 UNI-33-24.55-25.11~|~05 - 4R Maintenance - Resurfacing~|~D72E06A891B83199A8F31D88056B220DD224EF41 101320~|~2~|~2~|~02/STR~|~CO CO Contr 02 plan split 2 created for the following STP Rural routes: FRA-161-0.00-0.83 MAD-161-0.00-3.62 UNI-38-0.30-7.61 UNI-161-12.19-13.49 UNI-245-0.00-7.50 UNI-347-8.09-15.53 UNI-42-4.84-9.89~|~05 - 4R Maintenance - Resurfacing~|~AA0EE89B622564F621E0D8C14CE8AA46CC14AF6D 101320~|~1~|~3~|~03/NHS~|~CO CO Engr 01 plan split 1 created for the following NHS routes: FRA-33-0.00-0.32 UNI-33-24.55-25.11~|~17 - Construction Engineering~|~F0488F55650C7139479C414F16C4F53449AAA520 101320~|~2~|~4~|~04/STR~|~CO CO Engr 02 plan split 2 created for the following STP Rural routes: FRA-161-0.00-0.83 MAD-161-0.00-3.62 UNI-38-0.30-7.61 UNI-161-12.19-13.49 UNI-245-0.00-7.50 UNI-347-8.09-15.23 UNI-42-4.84-9.89~|~17 - Construction Engineering~|~1511F26A317701562DBA8C34C028B56F7597A099 112190~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~08BB32765E705E1EF2373F1D7A5C7A2C02F4F559 92491~|~1~|~1~|~01/IMS~|~Auxiliary Pavement Markings in POR, STA and SUM Counties~|~21 - Safety~|~5A80785BE8B967FF5C8A96202BCB8BE5A35D3576 96140~|~1~|~1~|~01/NFA~|~Construct a new equipment storage building at a new St. Marys Yard Facility.~|~44 - Other~|~F28CCB06807B33B65657BEFA465055BB1A7054FB 106729~|~1~|~1~|~01/MPO~|~Construct new sidewalks at designated locations along Cook Road and Fitch Road in Olmsted Township that is eligible for federal-aid.~|~28 - Facilities for Pedestrians & Bicycles~|~3D50549B4DFEE484C80ED8CD8B25533997C20E9C 84298~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~685F35424FCF05A9D856214142F065D92C2A2B0B 106307~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4.~|~21 - Safety~|~BB876D8EFF36FF41B5CD3AAD09D07AAC3E297F58 98111~|~1~|~1~|~01/NHS~|~Pavement resurfacing from SLM 24.26 to 26.12 and a EB auxiliary lane in the median from the IR 270 SB exit ramp to the bridges over Big Walnut Creek~|~05 - 4R Maintenance - Resurfacing~|~7EEDC48FD26889D902341AC2BE7776A1839129F7 98111~|~1~|~3~|~03/SAF~|~Safety funds for auxiliary lane addition in both directions from the Hamilton Rd ramps and the IR 270 ramps~|~21 - Safety~|~73CCB6EA9B9E6FBEABFDE76426BA83354C14F9D5 98111~|~2~|~4~|~04/NHS~|~Repair damage to Gender Rd structure over US 33~|~13 - Bridge Rehabilitation~|~85665269320E4FF8BB62A54EDB026B7E29DD9871 98111~|~1~|~2~|~02/NHS~|~Overlay and widen bridges for auxiliary lanes: FRA-33-2503 L/R FRA-33-2509 L/R~|~13 - Bridge Rehabilitation~|~7901D9284613C6DAD37791642A2FF72E40AFA0C0 98111~|~1~|~5~|~05/SAF~|~Additional cost of clear panel noise wall to be paid by property owner.~|~21 - Safety~|~627B74A0E26B87559870275B833B2A57934C6F86 87401~|~1~|~1~|~01/IMS~|~Provide loop ramp for traffic going northbound on I71 to go north on Mason Montgomery Road. Cost inlcudes widening of bridge HAM-71-1989R and WAR-71-0009R, but not rehabilitation (overlay) costs.~|~04 - Reconstruction - No Added Capacity~|~BA43CF940E36578C9594000C94129A1A0665030B 87401~|~2~|~2~|~02/IMS~|~Rehabilitate bridges HAM-71-1989L/R and WAR-71-0009 L/R installing new rigid overlays and work related to the rehabilitation of these structures for SFN's 3107752, 3107760, 8301727 & 8301697. Widening cost of these structures is NOT included in this plan split.~|~47 - Bridge Preventive Maintenance~|~ED1CCB976A962C97D8EB520BE15D25F034E6A3EF 96898~|~1~|~1~|~01/IMS~|~Noisewall maintenance~|~44 - Other~|~39265920F52B1FCFEAAA3B724067FB58DDF6B802 96898~|~1~|~2~|~02/IMS~|~Split for extra work change order funded by DA - 100% state funds (4PS7)~|~44 - Other~|~9B8B80A7E6AD122B45ACF8B2074E474724C78334 123483~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~0EC9F0DA2BF782997CE9A7A52A5584CC7C6DEEF2 123483~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. ~|~~|~F4C89593A690D4310E208B0789B2E6353C8C3893 126154~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~035C4D1B16190A1EE7F1A1435C239D647BB38473 116767~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~24A60B412BA7765BAFE6EB44FEFA5029426AE7DE 108264~|~1~|~1~|~01/STR~|~Slide repair ADA-348-11.20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~526822F0BF12A84ABCEB386B40F2F7F279DFC562 126142~|~1~|~1~|~01/BRO~|~all work is in this plan split~|~47 - Bridge Preventive Maintenance~|~CBFC73F300CA7EDD50E42865D454659695A5C8EC 96920~|~1~|~1~|~01/SAE~|~Pavement Marking~|~21 - Safety~|~4C64AB586103262719D326A14EAF7645BC5A8156 92998~|~1~|~2~|~02/NFP~|~100% Local funds - Over funding cap~|~17 - Construction Engineering~|~587B12A14E54ABC4051F9B652A39CDC7F62997CF 92998~|~1~|~1~|~01/NFP~|~Intersection Improvement~|~04 - Reconstruction - No Added Capacity~|~7ADD5AC74EE832524111BF69B2C5DA17A3D77457 87291~|~1~|~1~|~01/S>2~|~Microsurfacing TRU US 62 from 0.00 to 2.55.~|~05 - 4R Maintenance - Resurfacing~|~51E16250D135859582CD6CAFD935CF655BA4678C 104152~|~1~|~1~|~01/NHS~|~Resurfacing on NHS route.~|~05 - 4R Maintenance - Resurfacing~|~53C78A6AD125CABD4DC68D94B9E594CE31DF4F69 112466~|~1~|~2~|~02/NFP~|~Plan split for non-eligible funded work at 100% Local cost.~|~17 - Construction Engineering~|~4A6F35990EBBE66B761D451D108C80E063AB063A 112466~|~1~|~1~|~01/MPO~|~Plan split for MPO funded eligible work.~|~05 - 4R Maintenance - Resurfacing~|~352E52E5EBB33766FD41ED82679897DCD103C9B7 97304~|~1~|~1~|~01/SAE~|~Installation of approximately 15 miles of thermoplastic pavement markings on various County roads in Clermont County.~|~21 - Safety~|~2A5D5D9B0732F6B155486A736815F471A66E3195 84573~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ATH 50 0.00-1.74 and VIN 50 16.34-17.75, 19.76-30.16. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C53C7AF51E9AE00F3287F4D0BBD9DC5467FD2147 100318~|~1~|~1~|~01/S<2~|~Fine graded polymer AC Overlay for ATB SR 84 from 2.14 to 2.61 and 3.85 to 7.40 and 10.45 to 12.02.~|~05 - 4R Maintenance - Resurfacing~|~B07A218961CC68266B0C24D1E1CF5BA44DCFA406 100318~|~1~|~2~|~02/STR~|~Fine graded polymer AC Overlay for ATB SR 84 from 0.00 to 2.14 and 7.40 to 10.45.~|~05 - 4R Maintenance - Resurfacing~|~A6BCC5CAFC14DF5115C756F86AC1A92BD25C606C 97794~|~1~|~1~|~01/IMS~|~SFN 0602256 - 0602280 AUG-75-0754 L/R - Provide new bridge decks (class S), parapets and expansion joints, patch abutments and backwalls, epoxy inject pier cracks, and seal structure concrete.~|~13 - Bridge Rehabilitation~|~BCA7C0D45BE78F57B411AB0C3A3DBC51390C1854 96221~|~1~|~1~|~01/NHS~|~Extend southbound left turn lane on US127 to John Gray Road.~|~21 - Safety~|~7F176301C8B9D37FBF1F08BB4AEE2EB103623179 113036~|~1~|~1~|~01/S<2~|~Small City funded Plan split up to $2,000,000 CAP - Local funds after~|~04 - Reconstruction - No Added Capacity~|~5B2F1578755B65BEB8102B9ED626D52CC1AECA20 113036~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope items, including water line replacements~|~04 - Reconstruction - No Added Capacity~|~A34B6EB86024CFE77B3C9BA3A2A4AD8AB72FF45B 101705~|~1~|~1~|~01/NFA~|~Replace structurally-deficient bridge.~|~10 - Bridge Replacement~|~1CD69600CF5A73A8F83AB8B34D76D94714F7393B 101277~|~1~|~1~|~01/STR~|~Resurfacing for Rural Section - San 53 0.00 to 2.52; 3.05 to 4.55~|~05 - 4R Maintenance - Resurfacing~|~DBF50C71403F5056BA1D505CD08FE7ADB58ECF67 101277~|~1~|~2~|~02/S<2~|~For the urban section - San 53 2.52-3.05; 4.55 to 5.95~|~05 - 4R Maintenance - Resurfacing~|~6BBE90848C93F7A5A0955EC9B7D5FCD0FAEF07EB 109249~|~1~|~1~|~01/NFP~|~Wearing surface replacement on 4 structures~|~47 - Bridge Preventive Maintenance~|~92C4F7742D151DD736A65C0835B1D89071B5864D 113680~|~1~|~1~|~01/STR~|~Chip Seal CRA SR 98 19.20 to 23.74Chip Seal RIC SR 98 00.00 to 03.44~|~05 - 4R Maintenance - Resurfacing~|~2024E2A4E88063CCED8DAD2849E8EA30D46B4D26 113680~|~1~|~2~|~02/S<2~|~Chip Seal RIC 98 3.44 - 4.71.~|~05 - 4R Maintenance - Resurfacing~|~5624CDB9DD9E3D4072C6619614F8076FB5649442 114125~|~1~|~1~|~01/NFA~|~Culvert replacement at HOL-515-0.18~|~04 - Reconstruction - No Added Capacity~|~A0839D28682CC44D266B29D3B10094F3C6D6D390 81110~|~1~|~1~|~01/STR~|~Rural other federal aid. Paving invert of culvert pipe. VIN 50 0.49, SFN 8200033.~|~44 - Other~|~518BD8C63C26FEF380AE27F0D04E3F573424C41B 92505~|~1~|~1~|~01/NFA~|~Bikeway construction~|~28 - Facilities for Pedestrians & Bicycles~|~3631E381DFE6998182038132BB557587971323F8 113448~|~1~|~1~|~01/S>2~|~Implement a road diet to reduce the through lanes from four lanes to two lanes with a double left turn lane and bike lanes. New pavement and pavement markings will be installed with improved crosswalk markings in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~62AD5D4ADAE996E75500360075AA9E0F3EE2B901 123422~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~D4E8749F974BB984C24A82E1A67CE699C21F8785 93051~|~1~|~1~|~01/SAE~|~This Plan Split is for safety work eligible for 100% federal funding. The federal funds are from the City of Findlay budget.~|~21 - Safety~|~C0DC9793609A5E4060A4E091760B92B268352434 102153~|~1~|~1~|~01/NFA~|~D9 4-lane mowing.~|~44 - Other~|~0786815E32A3D5AE385B792D9B3E052F6F688529 118484~|~1~|~1~|~01/MPO/AND~|~Widening of Clough Pike to provide EB and WB left turn lanes at Newtown Road. Addition of sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road.~|~21 - Safety~|~751D0B4A49AE017852B868E35498F2662F0ACBE1 93581~|~1~|~1~|~01/S<2~|~"01/S<2/OT/CAMB" - City of Cambridge project for the installation and replacement of sidewalks on various City Streets~|~28 - Facilities for Pedestrians & Bicycles~|~283E2BF8EEC7006F28B08BAB84F71FF451B0D140 120271~|~1~|~1~|~01/ENH~|~Construction of pedestrian facilities through the SRTS program utilizing 100% SRTS Federal funds (inc. TRC) in Construction phase up to CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~8EA64286F8119D20CB27483EF2960C51D7010F74 107769~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funded using SAC 4PS7.~|~21 - Safety~|~806E6BD47305592842BDD02C60787E6DEF56F838 123772~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~4B0F302A50715E5FCB67D4BDFB83E7A198FA15C2 111195~|~1~|~1~|~01/SAF~|~Replace guardrail end treatments at various locations~|~21 - Safety~|~41B83131A89FE87BB38BBA43FAFCF718099B06BF 123414~|~1~|~1~|~01/STR~|~Resurfacing SR 83~|~05 - 4R Maintenance - Resurfacing~|~62F1FF8AFB211CBDD25FD34078BAA1AA02A97637 107899~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~395C72DB91581EEEF758FE5C7B9AB500EFF174AC 107899~|~1~|~2~|~02/S<2~|~Urban Area (STP <200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~5E3CEC2DE565DC5FCD77361908B5A19D02F590DB 107899~|~1~|~3~|~03/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~FC21F274B18FF6B85C077B02D57423C2D5B216D2 107899~|~1~|~4~|~04/S>2~|~Urban Area (STP>200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~9EAF41A1B660831BC3A08B9D322B327DFB94DAFD 83585~|~1~|~1~|~01/S<2~|~Replace deficient bridge with minimal approach work on SFN 7500696 SHE /SR 47 1643 in Sidney on State Route 47 at 0.72 mile East of the Junction of State Route 29 DA over Tawawa Creek.~|~10 - Bridge Replacement~|~8AB9B403722B3A451E2B34D7E3A613D80AAF5A4D 122896~|~1~|~1~|~01/ENH/KINS~|~Installing new sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~4197CECDDCF2F37324C3F9933F7876C16F6405FE 76938~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - Garvee Bonds (100% Federal) - $34,400,000.00 CAP - Construction of new interchange bridge on Fai-US 33-05.00 to 05.35; work on other structures~|~01 - New Construction~|~1B6F9235CDC4EAAAD78A182A9393015B88D3CD5E 76938~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - Garvee Bond (100% Federal) - $34,400,000.00 CAP - Construction of new interchange pavement on: 1) Fai-US 33-05.00 to 05.35; 2) Fai-CR 34-03.96 to 04.13; 3) Fai-TR 206-00.00 to 00.10;~|~01 - New Construction~|~24576266D2929862883D7DC97FCEA54ABAFFD472 76938~|~1~|~3~|~03/NHS~|~"03/NHS/OT/ " - Garvee Bond (100% Federal) - $34,400,000.00 CAP - Installation of Signals, traffic control, lighting, sewewr and water in support for Construction of new interchange pavement on: 1) Fai-US 33-05.00 to 05.35; 2) Fai-CR 34-03.96 to 04.13; 3) Fai-TR 206-00.00 to 00.10;~|~01 - New Construction~|~E5034C42F53550E519601FE0B8EE7749E10AC54A 125292~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~AAA5B2291D7B6C18F33A01B0CB54C708647A677F 100612~|~1~|~1~|~01/S<2~|~LOG SR 47 SLM 13.50 to 14.10 Mill and fill 1.75" with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~DDF18EA6978C009B5181BE44FBDD554F70A23653 100612~|~1~|~2~|~02/NHS~|~LOG USR68D SLM 0.10 to 0.50 Mill and fill 1.75" with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~D44195FADAB606269811192402F82D848102E509 125869~|~1~|~1~|~01/IMS~|~Establishing pro rata percent~|~44 - Other~|~FF7BE8557FBF3E1FE308E5C1018B6B58985315BD 104716~|~1~|~1~|~01/IMS~|~Gap project to perform joint repairs on IR.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8831863AB24115C50FB78DF51E524C834082679F 122220~|~1~|~1~|~01/NHS~|~Conduit outlet replacement.~|~04 - Reconstruction - No Added Capacity~|~BC0405245D7BF715093CA5B955C1769C5671F82E 122220~|~1~|~2~|~02/STR~|~Conduit replacement.~|~04 - Reconstruction - No Added Capacity~|~9812F475E3BF2BA9DCA3A6BC354B5C58222D0BE7 80277~|~1~|~1~|~01/NHS~|~Noisebarriers for the south side of US 35 between Nicolas Street and Jordan Avenue. Exact SLM to follow.~|~44 - Other~|~5F67E826F3DB4A76FC4A78FAEA6B646E7F5E4455 80277~|~1~|~2~|~02/NHS~|~Reconstruction (retaining walls, guardrail, signing, pavement markings, and incidentals) of Jordan Avenue in Dayton on USR 35 from SLM 18.18 to 19.10~|~04 - Reconstruction - No Added Capacity~|~7E73B2D7B990F130916BAE58904C77DA07B88E7F 110671~|~1~|~1~|~01/STR~|~All costs under this split. Uses district capital allocations.~|~05 - 4R Maintenance - Resurfacing~|~327F16AE36961D7EA3566E0EDA88741A9B4D7912 102455~|~1~|~1~|~01/IMS~|~Concrete Pavement Repairs on IR 70 from SLM 7.62 to 12.62~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~12E46029B5B64B8D5DF0F11513022847FEEFA597 109612~|~1~|~1~|~01/NFA~|~Bridge repairs to the linked structure.~|~~|~DE7D50DCE3FFD2EBADC4C9F4D12FE01B313452E7 115909~|~1~|~1~|~01/NFP~|~Diamond grinding on the IR 70 to SR 256 Ramp~|~21 - Safety~|~4D84CBA3ADE8DD176D620F411DD5DC46F5F31302 93766~|~1~|~1~|~01/NHS~|~Reface abutments with anodes and upper launch to carch deck spalls at abutment and patch wingwalls with anodes on SFN 4600630 LOG 33 1521 L. TWP RD 217.~|~13 - Bridge Rehabilitation~|~364B84C3AD350220F9C8288B68B4295BF326A672 92094~|~1~|~1~|~01/BRO~|~ Field pave existing twin pipe arches from the right of way line to the outlet of the pipes. SFN 5704111 MOT SR 49 5.46 over Tributary of Dry Run.~|~13 - Bridge Rehabilitation~|~2B4B44F2960BE8F48C7F64A3F65B3F654D7BAA05 92094~|~1~|~2~|~02/NHS~|~Field pave invert of culvert with concrete on SFN 5704138 MOT SR 49 5.73.~|~13 - Bridge Rehabilitation~|~D806F26E5FD4E7183DE9D0C76731D71899BFA8A1 92785~|~1~|~1~|~01/NFA~|~Rehabilitate and resurface various routes and parking lots within Miami Whitewater Forest. Improvements include pavement planing, pavement repairs, pavement widening asphalt concrete surface course, pavement markings, installation of parking blocks, and installation of guardrail.~|~05 - 4R Maintenance - Resurfacing~|~7E8FB3840F58B7EE72501AF88A018977BD303900 101992~|~1~|~1~|~01/NFP~|~Epoxy pavement markings on various routes throughout District 4.~|~21 - Safety~|~9FC5201DCABD065A62C75C83CF3CE0CAA2396C21 92147~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for 1 year mowing contract~|~31 - Landscaping & Other Scenic Beautification~|~0A7A93444E7CEC631B89880D1030BADEA3DF9E01 85530~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~6F69728F7EE8D07C55DB5E45A21B0770AD65C7E7 116196~|~1~|~2~|~02/BRO~|~All bridge replacement work included in this split.~|~10 - Bridge Replacement~|~19FB116071B4E9ADCED8F804BC76A8C301EA36D4 116196~|~1~|~1~|~01/S50~|~All road widening and drainage work included in this split. Work funded with 80% federal funds from the CEAO with the 20% match provided by Allen County. All funds needed after the CEAO cap is reached will be provided by Allen County.~|~04 - Reconstruction - No Added Capacity~|~86C4A7DEE9AD87CF2623B2564C21929A20198F06 117487~|~1~|~1~|~01/MPO~|~Plan split for path construction.~|~28 - Facilities for Pedestrians & Bicycles~|~03CDB5332729E6A513A76664FFFAFBADCAB174ED 115365~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - replacement of structure COS SR 93 19.21 (SFN 1602160).~|~10 - Bridge Replacement~|~2A9BB3D56CE166E829D7937F1D0810496C3B7B1A 101838~|~1~|~1~|~01/STR~|~Repair various bridges on the district by refacing abutments, fixing scour issures & patching piers.~|~13 - Bridge Rehabilitation~|~51FCA88682873900C9E0C75704F8ED5D2F2F12CF 101838~|~1~|~2~|~02/NHS~|~Repair various bridges in the district by refacing abutments, fixing scour issues & patching piers.~|~13 - Bridge Rehabilitation~|~F2DD030F37DCC527BFD4677D3E90497135C1B15E 101838~|~1~|~3~|~03/IMS~|~Reapir various bridges in the district by refacing abutments, fixing scour issures & patching piersThis split is for Interstate bridges.~|~13 - Bridge Rehabilitation~|~113AE6AD5A31F22A575086C80D2499E28AC141E1 110895~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix~|~05 - 4R Maintenance - Resurfacing~|~8FB9C531E31C11CEF18CD31FD844B163C4796E74 104713~|~1~|~1~|~01/NHS~|~Resurfacing of SR 315 and reconstructing off ramp~|~04 - Reconstruction - No Added Capacity~|~0297E598DEE6B047ADADDD9D667D7707EF1F5B64 104713~|~1~|~2~|~02/S>2~|~Reconstruction of the intersection of Olentangy River Rd and Goodale Blvd and resurfacing on Olentangy River Rd.~|~04 - Reconstruction - No Added Capacity~|~3687BA79F054D9EF5E0610A620DC74863CED9F8E 104168~|~1~|~1~|~01/ENH~|~Street lighting, traffic signal, pedestrian buttons, benches, trash receptacles~|~28 - Facilities for Pedestrians & Bicycles~|~4708DF276F05C871D70D7FD27A480FF82D61292B 108078~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridge.~|~13 - Bridge Rehabilitation~|~4E41F65F80D6368218D1B7B82DD91678E149641C 117200~|~1~|~1~|~01/S5K~|~Installation of sidewalks, curb ramps & pedestrian signals~|~21 - Safety~|~7D8900ADE2210B8BB64414EC242E9D6403209A4C 117200~|~1~|~2~|~02/S5K~|~Traffic signal replacements on Indiana at Kishler and Executive~|~21 - Safety~|~5457CC88CFBEEC2FD3D8E64507A954B1AE8B1C27 94258~|~1~|~1~|~01/STR~|~JAC 93 3.64 - 8.64~|~05 - 4R Maintenance - Resurfacing~|~9BC84005437CB69FC91A99734DA4128D85D766DD 77038~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6F33A7E9C3C5E2F40E7FBEC737743B193954B845 77038~|~1~|~2~|~02/IMS~|~ONYX shoulder fog seal treatment (100% State)~|~05 - 4R Maintenance - Resurfacing~|~AA5DD0BBE9C5E6E30F5DB3BE2BE21BEED6E1AEAF 116837~|~1~|~1~|~01/S>2~|~Split for bridge work~|~04 - Reconstruction - No Added Capacity~|~07D93E29E9F3F1DD2E380061C4D1050692F22016 122207~|~1~|~1~|~01/SAF~|~SRTS funding for SUP~|~28 - Facilities for Pedestrians & Bicycles~|~E148599104D7AD68D37B725F5AD9A26740E96A9D 122207~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded feature that are not necessary for SUP~|~44 - Other~|~5C16DD03FFAC7C75F0EBD1525A80EB23DCEB9741 111574~|~1~|~1~|~01/NFA~|~Split for bridge replacement work.~|~10 - Bridge Replacement~|~0BCF5BFC8A9B55D784D0006F351D1A2923986894 111574~|~1~|~2~|~02/NFP~|~Plan split for non-eligible items at 100% local cost.~|~10 - Bridge Replacement~|~9E79CF08E09317B85948C08BB639D1CF9A59882B 108357~|~1~|~1~|~01/NHS~|~Bridge painting project. MOE 7 19.51 (SFN 5600545). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~FA49086CDFDB8A25B5EA7510BE215F217AAD0C86 108357~|~1~|~2~|~02/STR~|~Bridge painting project. WAS 676 5.18 (SFN 8404909). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~7A5BFBE7D4E5434FA02E3A2D666C6DDBA61E3FE2 108357~|~1~|~3~|~03/NFA~|~Bridge painting project. WAS 260 9.69 (SFN 8403902). Not on the federal aid system funded 100% state.~|~13 - Bridge Rehabilitation~|~75F89AA644C233266A71D7169701A92EF8FF7CFC 102177~|~1~|~1~|~01/NFP~|~Addition to the D10 Traffic Building to house the test lab. Non federal aid project funded 100% state.~|~17 - Construction Engineering~|~32ACCB8F296DC19BD6916F51B924B3507131FD86 93021~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 33-00.00 to 05.10~|~05 - 4R Maintenance - Resurfacing~|~CCBEEACBDCD794EDC4D9898C43DEF61B22564B4C 93021~|~2~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - deck sealing on four structures - SFNs 2300478, 2300486, 2300540, and 2300443. Work will also include joint replacements for pressure relief joints and approach slab joints on SFN 2300443.~|~47 - Bridge Preventive Maintenance~|~625FDC87E79D04E5DF103E7630915C6265168264 108549~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH CR 20 2.82. DSR ATH-010. Rural other federal aid funded 80 federal/20 local ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~452D7926669B2A1CB888AC6022A778400FFFD26C 108549~|~1~|~2~|~02/S<2~|~OH18-01 ER Event. Landslide repair project. ATH CR 42 4.48. DSR ATH-011. Rural other federal aid funded 80 federal/20 local ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F34EBBADFBBD048A7F45480494E71E8E3E2C974A 90982~|~1~|~1~|~01/SAE~|~Cross walk ugprades at 9 locationsBikepath from Thomas Lane to Middle SchoolTwo radar speed display signs01/SAE/OT/~|~28 - Facilities for Pedestrians & Bicycles~|~48449B14585494903A8A3D76AA80690D2DA3053C 90982~|~1~|~2~|~02/SAF/Lon~|~100% City of London funds to replace deteriorated sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~F94DFE90F14B11BB59C1F1909D6A89D5489E4A34 96839~|~1~|~1~|~01/NFP~|~Expo Center~|~44 - Other~|~D2E1CA41BECE78C4E378A4FCE6D2FC5B8263F2E0 88371~|~1~|~1~|~01/BRO~|~Replace a deficient structure over Interstate 75 with minimal approach work on Statler Road SFN 5503094 MIA 75 1569.~|~10 - Bridge Replacement~|~FD7A0A7DD60421E29072BD93886819BD2AF8DB71 100877~|~1~|~1~|~01/STR~|~Chip seal in the following counties, routes and sections: DEL-257-14.26-22.62 MAR-203-1.19-3.24 MAR-257-0.00-0.65 UNI-37-2.20-5.49 UNI-38-0.00-0.11 UNI-38-0.30-7.61 UNI-47-0.00-7.57~|~05 - 4R Maintenance - Resurfacing~|~57A059152A4350C3CB0F96300868D2C9AEF56A75 94136~|~1~|~2~|~02/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4F252A3A2E8F273759A3FA07FF479C3B7DDD4DF9 94136~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2C7A4CE04BD6DC1DD24830349D0FCBF7A259A782 94136~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~CB1A2BF0F56203CBC6B3266B26DB5479DBC779D0 102555~|~1~|~1~|~01/NFA~|~District Lands and Building Maintenance Funds - LBM7 (100% State) - No CAP - Reconstruction of TR 1708 to a paved roadway, providing access to the new Security Gate.~|~05 - 4R Maintenance - Resurfacing~|~4F4721DEF2B7D34768AF92369EDC1A8500F9302B 98529~|~1~|~3~|~03/S>2~|~FY2018 Urban Paving Project in the City ofWilmington. This plan split is for SR 134 where the pay items are split 80% State and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~166F846F0CFBFF56F6FA8CB366FF62D9D7F4A576 98529~|~1~|~1~|~01/NHS~|~FY2018 Urban Paving Project in the City ofWilmington. This plan split is for US 68 where the pay items are split 80% State and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~2A2E5974120C45CC421CDE83E4008F26256308A8 98529~|~1~|~4~|~04/S>2~|~FY2018 Urban Paving Project in the City of Wilmington. This plan split is for SR 134 where the pay items are 100% City.~|~05 - 4R Maintenance - Resurfacing~|~5B5B4F89733E649F93D17D3CDEE970694B990280 98529~|~1~|~2~|~02/NHS/WILM~|~FY2018 Urban Paving Project in the City of Wilmington. This plan split is for US 68where the pay items are 100% City.~|~05 - 4R Maintenance - Resurfacing~|~F914D87EAFE29508CC23CE9F240DC5AE06188D44 107875~|~1~|~1~|~01/STR~|~Resurfacing work on SR 501 in Allen County from the county line to the Lima Urbanized Area boundary at Breese Road at SLM 2.01. District preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~7FEBA87F21105D05EDBBE25799709D6C73271933 107875~|~1~|~2~|~02/S<2~|~Resurfacing work on SR 501 in Allen County from the Urbanized Area boundary at Breese Road at SLM 2.01 to the end of the project. District preservation funds.~|~17 - Construction Engineering~|~57B06DCCD24248A117D87F81273468C470EB57EC 105735~|~1~|~2~|~02/NFA~|~Work on a structure that meets the state but not federal definition of a bridge which is located on SR 701 in Hardin County. The road is a Rural Minor Collector and not eligible for federal funds. 100% state funds from the District Preservation Program SAC 4PS7.~|~04 - Reconstruction - No Added Capacity~|~617013B2361B6328390B343C35045E46A90D3CEF 105735~|~1~|~1~|~01/STR~|~District preservation funds using 80% federal SAC 4PF7 and 20% state SAC 4PS7.~|~04 - Reconstruction - No Added Capacity~|~59571FBB492D43DB4CE61CDC644B6474152FDBDD 122446~|~1~|~1~|~01/STR~|~Encase several bridge piers throughout District Six.~|~47 - Bridge Preventive Maintenance~|~0D9B6236A58DA6AF6D586A68BD98BAEF842FCC0F 122446~|~1~|~2~|~02/S5K~|~Work on MAR-95-17.443 within the Marion Urban Area~|~47 - Bridge Preventive Maintenance~|~5D1DC62CBEB0F2330FB78C4E6A1618CB4E46E218 122446~|~1~|~3~|~03/NFA~|~Work on MAR-100-1.442 (not on the federal aid system)~|~47 - Bridge Preventive Maintenance~|~3C05A57C88EEE1421B1585E70C46A76DE5051125 105390~|~1~|~1~|~01/NHS~|~Smooth seal on NHS route: DAR SR 49 SLM 0.00 to 6.16~|~05 - 4R Maintenance - Resurfacing~|~A94E11127A15D014D5BB43A3F3D86910505D30FF 105390~|~1~|~2~|~02/STR~|~Smooth seal on rural route: DAR SR 118 SLM 8.58 to 12.95~|~05 - 4R Maintenance - Resurfacing~|~038827C025A4C571E4A2519DE86EB70CCE727E6B 102097~|~1~|~1~|~01/SAF~|~Add signal and left turn lanes on SR3 at Galena Road in Delaware County~|~21 - Safety~|~97A8B1B25B3023E206DC0EE1C1C4DF28E8406824 126392~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~B8307A3A557752EC00ACE448AE4853C9C3F02460 111240~|~1~|~1~|~01/MPO~|~Sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~7A5255BF4E99C68C1D297FA53171C2F5236C618B 99580~|~1~|~1~|~01/SAF~|~Intersection improvement of CR 32 and CR 53 (Middle Ridge/West Ridge)~|~21 - Safety~|~0F88C12A8FC788B150E221F9C97BD05B6D721591 98262~|~1~|~2~|~02/NHS~|~Urban System Paving in City of East Liverpool of SR 7. Eligible items include curb ramps and aux. pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~EBE896267C9A446374721D6EBF5EA8FCED9E5524 98262~|~1~|~1~|~01/NHS~|~Urban System Resurfacing COL-7 from East Liverpool SCL to COL-30 ramp at SLM 6.09, including pavement planing, asphalt overlay and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~3EBC67D70F573E0EDA0AD8188AA0ED2A87CBC5C0 98262~|~1~|~3~|~03/NFA~|~Extra work requested by ODOT at final inspection, including revisions to curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~0F94E400B46452F8A914B25625006411529398AA 96985~|~1~|~1~|~01/IMS~|~Bridges using 100% state money.~|~44 - Other~|~B074F4550BD8BD2DB0E830AB8B6CDD143BB98EF2 124498~|~1~|~1~|~01/NFP~|~Created for J&C TID involvement~|~~|~B72E66677DB2BA89F85C4F61BFA5F5AB2507D6F7 100648~|~1~|~1~|~01/STR~|~plan split for pavement work in the rural section:PRE-35 SLM 2.62-9.14~|~05 - 4R Maintenance - Resurfacing~|~F02C8C7987DF5D2C2FB7895E05186C6FDBB6B419 100648~|~1~|~2~|~02/S5K~|~plan split for pavement work on the small urban section:PRE-35: SLM 9.14-10.02~|~05 - 4R Maintenance - Resurfacing~|~584DCB18C969F7A8DB39BD52140F1439E5DBEF75 100648~|~1~|~4~|~04/STR~|~plan split for work on the PRE-35-0817 structure~|~04 - Reconstruction - No Added Capacity~|~090BD6E43FD8AC8BD3AA6AA0377A840970941D94 100648~|~1~|~3~|~03/STR~|~Upgrade railing and surface course only on 0860 bridge. ~|~13 - Bridge Rehabilitation~|~06711A84A6CB3ABB5DF24A7C7AC8EAFAA7CF2757 126902~|~1~|~1~|~01/NFP~|~Plan split for crack seal of various roadways~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0DC31F29B28FC7698A507AA544D210B01F9F84AE 99014~|~1~|~1~|~01/BRO~|~Bridge Funds~|~47 - Bridge Preventive Maintenance~|~2747FD7F78DAD5915D83DFDE786A85637B84CBA7 99014~|~1~|~2~|~02/BRO~|~Jennings Randolph~|~47 - Bridge Preventive Maintenance~|~0159C7CDC2B43AC97ED4D96E42E2DD318EC8A2C1 105605~|~1~|~1~|~01/STR~|~Rural Plan Split: MAD-56-19.64-24.35 MAD-142-11.44-13.34 PIC-56-15.38-16.32~|~05 - 4R Maintenance - Resurfacing~|~B6A67ABFB868F30A39F4257FF2FA669E8D792BDA 98040~|~1~|~1~|~01/NHS~|~NHS Resurfacing 80/20~|~05 - 4R Maintenance - Resurfacing~|~AB3868E7C3151700A568026BF71342B4493A0FAE 125484~|~1~|~1~|~01/MPO~|~City of Cincinnati resurfacing project for Victory Pkwy Ph2 to add bike lanes with resurfacing and pavement markings~|~05 - 4R Maintenance - Resurfacing~|~C5392093B50B5CD429EF9C3B58B4FB6D944218F6 109657~|~1~|~1~|~01/S<2~|~Resurfacing COL-344 from SLM 2.79 to 3.06 and from SLM 4.56 to 8.35~|~05 - 4R Maintenance - Resurfacing~|~C78AA9A259437268100794D3C995D3083241FC5E 109657~|~1~|~2~|~02/STR~|~Resurfacing COL-344 from SLM 3.06 to 4.56~|~05 - 4R Maintenance - Resurfacing~|~FEE0EF10F3EA989AE188FD18A207489BEEFC24AA 98699~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " District Maintenance Funding - 4CP7 (100% State) - Ding-N-Dent Guardrail repairs to damaged guardrails at various locations throughout D-05~|~21 - Safety~|~F7F9DEECC08E54B5ECDBCC1E0333E7D7C7CEB550 97774~|~1~|~1~|~01/NFP~|~Construct new full service facility~|~01 - New Construction~|~43E312E0D9A20D4045F14B52A12FDB62DF81360B 95554~|~1~|~1~|~01/STR~|~On SR41, brginning @ (SLM 13.21) thru West Union and terminate at SR32 (SLM 25.17), it is proposed to resurface the highway with asphalt concrete. 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~A728FC7ED1075B03351BB9594F379778E2B371A3 126100~|~1~|~1~|~01/ENH~|~Construction of trail bridge utilizing OMEGA RTPO Federal funds at 80%.~|~28 - Facilities for Pedestrians & Bicycles~|~C7E8E72DBCBE0C7DD2B57F0E42CE6DBA0325000D 121058~|~1~|~1~|~01/IMS~|~Interstate resurfacing~|~05 - 4R Maintenance - Resurfacing~|~736AF249318617613877A1CF0AEA037AA8CC02DA 98868~|~1~|~1~|~01/MPO~|~Lighting of Water Street from Third St to McGill St, Right of Way of Second Street from rear of Veteran's Memorial Park to Liberty St. Sidewalk improvements at the intersection of Third and Water Streets. Project includes 14 pole lights, 2,000 sq ft of 5ft wide sidewalks, 2 ADA curb ramps and 650ft of curbing.~|~21 - Safety~|~A2924D848EBB1B0731FEFAD49780C76DAB27B55B 98868~|~1~|~2~|~02/MPO~|~Resurfacing of Water Street from Third Street to Washington Street, Resurfacing of Third Street from Wood Street to Water Street in the Village of Lowellville.~|~05 - 4R Maintenance - Resurfacing~|~B0D7D363BB1CA920306C051E7D4C91AF5BE98EF1 98868~|~1~|~3~|~03/MPO~|~100% Local items not eligible for federal funding.~|~44 - Other~|~2A51FEFC445DC07E5D4725FA5400AA07D4D61542 109041~|~1~|~1~|~01/STR~|~Landslide repair at HOL-520-12.91.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~82CEE6EEE83FD9D613DBE7CBB2C92D89F92E1044 109041~|~1~|~2~|~02/NFA~|~Landslide repair at HOL-520-11.80.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~27FC217ACFC4014AD0485D23E593E4CB91956BF2 98413~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~E26BFAA6B65368A7FB5864412F8B0A45A606BEFF 98413~|~1~|~4~|~04/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~EC743CD15C3F3D317DEE9999BACE3A940A2860AA 98413~|~1~|~5~|~05/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~BABDF758D0443559D9223F23A6ED58B221F61B96 98413~|~1~|~6~|~06/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~93B3AE04BD2069DCD692C6FFEDA693FE3A0DF92F 98413~|~1~|~2~|~02/S>2~|~Resurfacing MAH SR 170 from 4.25 to 4.29 and 5.71 to 10.94.~|~05 - 4R Maintenance - Resurfacing~|~E6C6AAD8CC9BFB29B35A448C760CF47524BE5463 98413~|~1~|~1~|~01/STR~|~Resurfacing MAH SR 170 from 0.78 to 0.86 and 1.29 to 4.25.~|~05 - 4R Maintenance - Resurfacing~|~FF669E307E69B8180A01A1A9C424ACD8ED4C3C0B 111652~|~1~|~1~|~01/STR~|~GSM~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B03408B27289333E533776299262D56DC57B49BB 121826~|~1~|~1~|~01/BRO/AKRO~|~Bridge work.~|~13 - Bridge Rehabilitation~|~53BEE0DBE32AED66A532E928BE8BFE06D94E8E11 107326~|~1~|~1~|~01/NFP~|~Split for signal work~|~21 - Safety~|~D54F13DF467D8AFD0DB7C3A8938C26BF04327FD8 98525~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement~|~21 - Safety~|~B6FAE567177328F5BDBCE44D269852BB1BC86E02 92243~|~1~|~1~|~01/SAF~|~Ashtabula signal upgrade~|~21 - Safety~|~4ABBA28B12CD0FDD9AE1F102ECD170F12CA45974 98762~|~1~|~1~|~01/MPO~|~Resurfacing Belmont Ave from Martin Luther King Ave to Wirt Street in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~CB47B803802E443811B33108885F0F35CC8C00E3 89302~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Lic-SR 661-00.02 to 01.70; 2) Kno-SR 661-06.09 to 06.46;~|~05 - 4R Maintenance - Resurfacing~|~511411D25504C34A19F019D96087048871E2D0E9 89302~|~1~|~5~|~05/S<2~|~"05/S<2/OT/ " - District Preservation Marking Pavements 4PS7(State 100%) - No CAP - Striping after resurfacing on 1) Lic-SR 661-00.02 to 01.70; 2) Kno-SR 661-06.09 to 06.46;~|~05 - 4R Maintenance - Resurfacing~|~64D5BAFC387864DAA8779CC6E12BBEBBD4E9378E 89302~|~1~|~4~|~04/STR~|~"04/STR/OT/ " - District Preservation Marking Pavements 4PS7(State 100%) - No CAP - Striping after resurfacing on 1) Lic-SR 661-00.00 to 00.02; 2) Lic-SR 661-01.70 to 14.81; 3) Kno-SR 661-00.00 to 06.09~|~05 - 4R Maintenance - Resurfacing~|~830B296EA257264ED5FFBCDBA7ACC63537B4E571 89302~|~1~|~6~|~06/S<2/MTVE~|~"06/S<2/OT/MTVE" - District Preservation Marking Pavements 4PS7(State 80%) / 4BG7(Local 20%) - No CAP - Striping after Urban Paving on Kno-SR 661-06.46 to 07.41 inside the City of Mt Vernon;~|~05 - 4R Maintenance - Resurfacing~|~BA886836A7C1EDD5363D5FE6FE7EACF639056973 89302~|~1~|~3~|~03/S<2/MTVE~|~"03/S<2/PV/MTVE" - District Preservation 4PF7(Federal 80%) / 4BG7(Local 20%) - No CAP - Urban Paving on Kno-SR 661-06.46 to 07.41 inside the City of Mt Vernon;~|~05 - 4R Maintenance - Resurfacing~|~BDDAE42CCC25EE414EA487CB07E1CC170D28EBC0 89302~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Resurfacing on 1) Lic-SR 661-00.00 to 00.02; 2) Lic-SR 661-01.70 to 14.81; 3) Kno-SR 661-00.00 to 06.09~|~05 - 4R Maintenance - Resurfacing~|~EF4DB98D7C0CF1BB8DF147FE43DD96A72356794A 115910~|~1~|~1~|~01/MPO~|~Plan split for eligible MPO funded work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0781B41445B1A01A67623197B925AF0E5CD74D0D 115691~|~1~|~1~|~01/STR~|~Replacement of existing structure.~|~10 - Bridge Replacement~|~3F0036A8EB6727FD1F3A0EC1C49C9AECF2D8607D 127163~|~1~|~1~|~01/STR~|~Conduit replacement.~|~04 - Reconstruction - No Added Capacity~|~D61AB7678042108C081F3E58BFD847250F438AA3 87030~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping.~|~21 - Safety~|~216A89472F1D4027B2366F7524A4F0C674F31AC5 95406~|~1~|~1~|~01/NHS~|~Remove existing LMC overlay and replace with new LMC overlay using hydrodemolition. Rebuild deck edges. SFN 0600318 over Pusheta Creek.~|~13 - Bridge Rehabilitation~|~F2C0C623EFC089872E29AD7A1EC6D151426F6B5A 104756~|~1~|~1~|~01/NFP~|~Spot paving on various routes throughout ATB, MAH and TRU Counties.~|~05 - 4R Maintenance - Resurfacing~|~855764A2BFD5DE82D175F177A33F3EACB09554D7 114586~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 12.33. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F9058457427AA30D5E0247133155B8A75049111 114586~|~1~|~2~|~02/NFA~|~Landslide repair project. MRG 555 15.60. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1E65716C718B663D74EAA13D57F18E08D1D88B6E 120989~|~1~|~1~|~01/STR~|~Work within STP Rural~|~05 - 4R Maintenance - Resurfacing~|~F972FED0DFE0AB2963020D56D3084A44BBD2864F 120989~|~1~|~2~|~02/STR~|~Work in STP Rural~|~17 - Construction Engineering~|~D175D5B5BB2C8854BA808120A5A1637B41E61A18 101455~|~1~|~1~|~01/STR~|~DSR# JEF-003~|~04 - Reconstruction - No Added Capacity~|~B77870A63DDFC73E3733DEEF2C7CBB7E3EB286AB 118844~|~1~|~1~|~01/STR~|~SR 60 from Coshocton County Line to US 62~|~05 - 4R Maintenance - Resurfacing~|~9C05287F82DA8F6ECF7A5D937E0C257AB98920DC 118844~|~1~|~2~|~02/NFA~|~SR 60 from US 62 to Killbuck~|~05 - 4R Maintenance - Resurfacing~|~AE1DBF4C109B069CCC5EF1E262CF5C84D083CD1B 113777~|~1~|~1~|~01/NFA~|~Shawnee State Forest Bridge Repair FY23~|~99 - State Preventative Maintenance~|~1904EC5A5D5DD6F67237825FE176CE71C2C8AEC2 117123~|~1~|~1~|~01/S>2~|~This plan split includes all work associated with the paving work.~|~05 - 4R Maintenance - Resurfacing~|~6B6D0621D0226C2B15D254E5174C5DA2B0185AE8 117798~|~1~|~1~|~01/ENH~|~TAP eligible items at 95% (utilizing 15% TRC). ~|~28 - Facilities for Pedestrians & Bicycles~|~E5E912C0351BB99350D0091C03466E4A77E4C5A2 117798~|~1~|~2~|~02/NFA~|~Items not eligible for Federal TAP funding (paid with 100% Local Funds).~|~28 - Facilities for Pedestrians & Bicycles~|~EF77A9F9A7F7ADF298E75F4D620739B5BCC77011 126587~|~1~|~1~|~01/SAF~|~Safety plan split~|~21 - Safety~|~B5D292F7BD7132390DE01E18581E38314F5091D4 112635~|~1~|~1~|~01/NFA~|~Chip Seal ASD-179-0.00 to 9.717~|~05 - 4R Maintenance - Resurfacing~|~603A3157F65AE0CAEB848264F95C7A7F613D3E48 109428~|~1~|~1~|~01/NHS~|~Landslide repair project, GAL 7 29.99. GSM funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE3ECC7F107B9FA55B948BABB7F6247A704BF500 106668~|~1~|~1~|~01/NFA~|~See linked structure >20' span.~|~10 - Bridge Replacement~|~FAACA522971AABBE4DC39425DFE0E3D5A310924C 116080~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~99 - State Preventative Maintenance~|~492AE51E441A3A160195E5489B46E70A80C2579E 116080~|~1~|~2~|~02/NFA~|~Crack sealing ODOT facility parking lots in Massillon, Ravenna, North Lima and D4 HQ.~|~99 - State Preventative Maintenance~|~558A3C5DFAEA937C6A8837B084EB82CED2EBB765 110490~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~21 - Safety~|~28D914B6C1978C2D89E3C2955B58D65AB9A0F0E8 124586~|~1~|~1~|~01/IMS~|~Plan split for smart lane~|~21 - Safety~|~1E944EF89F2C23CE41CF6ABD27A0AC1C1E76C8A7 101329~|~1~|~1~|~01/STR~|~Bridge replacement.~|~10 - Bridge Replacement~|~23084485CFD79A0FEEEB859C19CFCF1E30EE5259 107613~|~1~|~1~|~01/S<2~|~SFN 8705224 Length 17 GA 4~|~10 - Bridge Replacement~|~34678F309A23658C42F2DBFD4A266DD86AF66CC2 93191~|~1~|~1~|~01/S<2~|~General system paving in the urban func class area:MAR-4: 13.00-13.81~|~05 - 4R Maintenance - Resurfacing~|~66B38367EE4D9AD478391C3063915D428B04C342 93191~|~1~|~2~|~02/STR~|~General system paving in the rural func class area:MAR-4: 13.81-20.49~|~05 - 4R Maintenance - Resurfacing~|~D35ECBE21300AED5A267C7B3B9CCEB6167FE0936 92450~|~1~|~1~|~01/STR~|~$1,738,125 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) program. Funds over this amount will be from the District Preservation Program budget.~|~44 - Other~|~8082E408453CC706AC5DFBCF50A1ED2A95128624 112586~|~1~|~1~|~01/ENH~|~Construct hike and bike trail in Canfield Township.~|~~|~C15DEA7D909830CD1437FDDA6387BF8BBDFFBB4A 101733~|~1~|~1~|~01/BRF~|~Replace Graham Rd Bridge (SFN 0433039) over East Branch of the Ashtabula River. Bridge is approximately 1.77 miles east of Stanhope-Kellogsville Rd (CR 33)/Graham Rd (CR 343) intersection.~|~10 - Bridge Replacement~|~91192BEB2F73AF5D927BBA178FE54D1001775E88 121540~|~1~|~1~|~01/BRF~|~Bridge Rehab on CR 148 over Riffle Creek~|~13 - Bridge Rehabilitation~|~E29EDE4F422DDFCAA858223E4F38E827650C6C6E 89113~|~1~|~2~|~02/SAF/SPRF~|~Decorative pedestrian lighting.~|~44 - Other~|~6D073F141EBCD59962BC1B712A93145FEEB2C6D1 89113~|~1~|~3~|~03/SAF/AKRN~|~City of Akron waterline replacement.~|~43 - Utilities~|~F6DF48DBDD6C85AC56EB0937D7F1B90CED2E113F 89113~|~1~|~4~|~04/SAF~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~7A5EDC1A1F00EEFCC1B1879A7A2DC2EAF7D5A915 89113~|~1~|~5~|~05/SAF~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~D760C88C537F919881B2D113A011FFB172F38653 89113~|~1~|~1~|~01/SAF~|~Widening of US-224 and SR-91, Summit County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~EF0C18A499A8746829A5C0B652009EFC83BD945F 89113~|~1~|~6~|~06/SAF/SCE~|~Widening of Canton Road (C.R.66) in Summit County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~5998565522105F7FBBDBFAFACE50C170FC9A11C3 89113~|~1~|~7~|~07/SAF/LAKE~|~Decorative pedestrian lighting and aesthetics within the Village of Lakemore, Summit County, Ohio.~|~44 - Other~|~AC8186973610F8A48DCCF5283D998DA0C97FAF32 116705~|~1~|~2~|~02/IMS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~FD3B13ADF648C9C0DA3C41061B1E4CDBECBC5EB9 116705~|~1~|~1~|~01/IMS~|~Resurfacing IR 76 and ramps at SR 534.~|~05 - 4R Maintenance - Resurfacing~|~F836CAE6BFC21BAD00FF06AD0CA63503CD8B8626 111368~|~1~|~1~|~01/NHS~|~MPO funded items split for work on NHS~|~05 - 4R Maintenance - Resurfacing~|~7E168A20E7A0ABD144E7DC3301A2CA7EC81FB208 111368~|~1~|~2~|~02/MPO~|~Plan Split 2 for non-NHS roadway segment.~|~05 - 4R Maintenance - Resurfacing~|~9D08F05B837BFAA61A05F415916DD186359A9E6F 123386~|~1~|~1~|~01/S>2~|~Plan split for roadway rehabilitation and reconstruction work items,~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE4E63A6E46EB2C659C3C68AE0E39E755D69EAA6 123386~|~1~|~2~|~02/S>2~|~Plan Split for bicycle and pedestrian improvements~|~28 - Facilities for Pedestrians & Bicycles~|~6F1A8AA3D64E08D7CF119D8763EF9737F33AF4A4 123386~|~1~|~3~|~03/S>2~|~Plan split for signal work~|~21 - Safety~|~9D8B4F3950F4B7618881BDFAF87353353021ABFE 123386~|~1~|~4~|~04/NFP~|~Plan Split for Work items that are not Federally eligible for reimbursement~|~28 - Facilities for Pedestrians & Bicycles~|~B5CFBCE0EF6AEC685F9E5DF0CBCC351E90AF709C 91846~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on JEF-151-8.64 to 15.52; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~90C9D74113F43D481E9FDCDCF7301F6E2A2DA970 91846~|~2~|~2~|~02/S<2~|~General System asphalt resurfacing of JEF-151-15.52 to 16.43; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~4FD2A4FCF59189799A077BA535D68BCB81605B1C 89442~|~1~|~1~|~01/STR~|~Landslide repair utilizing dig out and replace using GSM funds at MRG 78 21.77 and MRG 78 22.23. Work length approximately 300 ft each. 80% Federal/20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2AE7C486CBEA9113A775CA2C9D35CEC30B04D80 89442~|~1~|~2~|~02/STR~|~Change Orders 7 & 8.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0981B42FAF79B44DE1738362746271F3900D50AD 126026~|~1~|~1~|~01/NHS~|~Plan split for resurfacing US-6~|~04 - Reconstruction - No Added Capacity~|~44AC2AC1C82ED423B21E59AA2C7E3CD6B5AA824D 106371~|~1~|~1~|~01/IMS~|~Bridge deck sealing/deck patching on IR bridges.~|~47 - Bridge Preventive Maintenance~|~DFDF2F94445D02AFF5438A3A237B38BA183E52AA 95350~|~1~|~1~|~01/STR~|~SFN 6200184 OTT-2-13.12 over Rusha Creek.~|~13 - Bridge Rehabilitation~|~5F893E353FA3E6E665CD3395BB4CEBEEB1D901B5 113911~|~1~|~1~|~01/SAF~|~Resurfacing on County Road 24 100% Safety (4HJ7).~|~21 - Safety~|~307EF80183345A312654FDE770D71E032F7A70BC 120999~|~1~|~1~|~01/S>2~|~Large Urban portion of GRE-235~|~05 - 4R Maintenance - Resurfacing~|~93C59A986F655D8D81D15A604EC5CE0B76D232BE 120999~|~1~|~2~|~02/STR~|~Rural sections of GRE-235~|~05 - 4R Maintenance - Resurfacing~|~7D1E0E331C231174A6884420D6B72C0CF241FDFF 120999~|~1~|~3~|~03/NHS~|~plan split for the NHS portion of GRE-235~|~05 - 4R Maintenance - Resurfacing~|~45864A415A60422B0943D0FAA028AA0C6F1DD8DF 114412~|~1~|~2~|~02/S<2~|~Resurfacing on various roadway sections.~|~05 - 4R Maintenance - Resurfacing~|~522CD0520EAD4703CB55EE03E78896E5D58E051C 114412~|~1~|~1~|~01/STR~|~Resurfacing on various roadway sections.~|~05 - 4R Maintenance - Resurfacing~|~4B962B0818F6511FB666535C52162F2744ED68D5 114412~|~1~|~3~|~03/NFA~|~Resurfacing on various roadway sections.~|~05 - 4R Maintenance - Resurfacing~|~8CAA76B3D321FFDB9E26C8A43D9E82A5EE653B15 102408~|~1~|~1~|~01/NHS~|~Major rehabilitation of US 250 from SLM 23.47 (SR 800) to Harrison County SLM 0.77 (SR 151).~|~05 - 4R Maintenance - Resurfacing~|~C6A2AB3472011BD1866D445F1EDA022681346E38 102408~|~1~|~2~|~02/NFA~|~retroactive change order~|~05 - 4R Maintenance - Resurfacing~|~02284BBAD03DE2A38CD0587170FDB33A286E6D7E 101856~|~1~|~1~|~01/IMS~|~Split for jack and bore work~|~43 - Utilities~|~F571912E58E19A974047F88DF9E50A3ABE376E24 126008~|~1~|~1~|~01/S>2~|~Bridge rehab for FRA-MR1774-2.43~|~13 - Bridge Rehabilitation~|~A08DD09882B1C8163F9236F304096730A8BE722E 92035~|~1~|~2~|~02/S<2~|~CR 166 Make the eastbound right turn lane on Austin Blvd. at SR 741 a free flow lane and will also install a median between the right turn land and through lanes.~|~21 - Safety~|~95D485E02E39231C83054A99828C2F5693787093 92035~|~1~|~1~|~01/NHS~|~SR 741 widen the Northbond approach to accomodate the follow-through lane for the eastbound free-flow right turn, as well as future dual northbound left turn lane.~|~21 - Safety~|~B6692D4B220AFA84AE9FF7ABECA8FB394FE72C90 116272~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~9F5CC026F893086FE3664735961F6951A948E343 84428~|~1~|~1~|~01/S<2~|~Shoulder stabilization and resurfacing of the existing roadway with asphalt conrete on CHP US 36 16.20 to 17.18 segment length 0.98 mile total lane miles 1.96.~|~05 - 4R Maintenance - Resurfacing~|~4C231853EEFBFB870D887C6F489D9097021FE14E 84428~|~1~|~2~|~02/STR~|~Shoulder stabilization and resurfacing of the existing roadway with asphalt conrete on CHP US 36 17.18 to 17.23 segment length0.05 mile total lane miles 0.100.~|~05 - 4R Maintenance - Resurfacing~|~80012124A335E3032F3D0AB9C1A4724BACC3FF34 115690~|~1~|~1~|~01/STR~|~Rural STP resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~9EB248673AF08CCF2F4DF6CFD9C5DBAC293E310F 110437~|~1~|~1~|~01/STR/COSH~|~01/STR/PV/COSH - Plan Split 1~|~17 - Construction Engineering~|~12474E5278C1E5B2AACB5175F2124683AE68AED4 110437~|~1~|~2~|~02/S5K~|~Plan Split 02/S5K/PV/COSH - ~|~05 - 4R Maintenance - Resurfacing~|~0A23582D0058180E84AD4693E23D8457FB40F3CC 127229~|~1~|~1~|~01/SAF~|~Created plan split for Safety funds.~|~28 - Facilities for Pedestrians & Bicycles~|~D9A4794468E92C36193A8437E3567CF86333ACF0 106541~|~1~|~1~|~01/NFP~|~Resurfacing and repair of roads and camping pads within AW Marion State Park~|~05 - 4R Maintenance - Resurfacing~|~0F669424AFEB0FF75BBDEA76C67B03C1F90411ED 96434~|~1~|~1~|~01/NFP~|~Sign mounting retrofit~|~21 - Safety~|~DA8377C0177E6959B51BEC5A66EC383FA9948389 102342~|~1~|~3~|~03/STR~|~Fine graded polymer overlay of SR 165 from MAH Co. Line to SR 14.~|~05 - 4R Maintenance - Resurfacing~|~C88CFBA750EED4C90E16F30D2D70A0F15CAF7C3A 102342~|~1~|~2~|~02/NHS~|~Resurfacing work on US 62 within the City of Salem from SLM 11.39 to 11.64.~|~05 - 4R Maintenance - Resurfacing~|~5CB11B5A81530114DA270CD2A90A227614D067C4 102342~|~1~|~1~|~01/NHS~|~Fine graded polymer overlay on US 62 from SR 45 to SR 14T, excluding work between SLM 11.39 to 11.64 (City of Salem).~|~05 - 4R Maintenance - Resurfacing~|~1B9AF0F13D2509378B95CEC7863E87116496FC68 100087~|~1~|~1~|~01/NHS~|~USR 33 SLM 16.72 to 16.94 Convert the intersection of US 33 and Wapak-Fisher Road to an offset T intersection with right turn lanes to improve safety.~|~21 - Safety~|~7D4B3C8A3D0B7837CC9B0944B91709B3AE42B2D3 100087~|~1~|~2~|~02/S<2~|~CR33A SLM 11.39 to 11.74Convert the intersection to US 33 and Wapak-Fisher Road to an offset T intersection with right turn lanes to improve safety.~|~21 - Safety~|~24AF5610F3494169C01671E50AA54D26C325EF7A 106105~|~1~|~1~|~01/BRF~|~Plan Split~|~10 - Bridge Replacement~|~BB0C33B6ABB2CABA61D2403538EE72205116349F 111474~|~1~|~1~|~01/NFA~|~Widening Orchard St in the Village of Mantua~|~04 - Reconstruction - No Added Capacity~|~8E60FB424F708B2ED7E3CD1398FFB2D44DEBA126 107523~|~1~|~1~|~01/STR~|~Shoulder replacement and resurfacing of COL-172~|~05 - 4R Maintenance - Resurfacing~|~FABB96E2AB43618AEA876DFE7BC9804C0F85AAF9 100450~|~1~|~1~|~01/NFP~|~Split for all work~|~99 - State Preventative Maintenance~|~9808165CC3E495DF63ABF1897A07283E405D4EF6 78041~|~1~|~1~|~01/SAF~|~Safety funding up to $3M for turn lanes on SR-315 with retaining walls, curb, enclosed storm sewers, pvmt overlay and repairs, signal & guardrail upgrades. This split will also fund turn lanes on SR-750.~|~21 - Safety~|~6114C1BDEEE447FF8812035E0FB4026B45F0EA38 78041~|~1~|~2~|~02/S>2~|~D6 funding to repair slip on SR-315 at 86+00/SLM 1.63~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C41BA3C38EB7BE29F6E10DE37C6BCCB97D79819B 125906~|~1~|~1~|~01/IMS~|~establish pro rata percent~|~44 - Other~|~22A0C147FC8A1E9E6E85DC4631BF5D391F5CE900 93778~|~1~|~1~|~01/SAF~|~This project is currently funded with all ODOT safety funds. Restrict southern access to Goodwill Industries to right-in/right-out; construct an extension of Springfield Park Drive to provide full access to Goodwill Industries.~|~~|~ADA430B8C6E19C468A1ED9619163C61B04C6DE6E 96150~|~1~|~1~|~01/NFA~|~New Outpost for Hamilton County - New Harrison.~|~01 - New Construction~|~47D8A4A888AEA359AA541393D679E350F61FA331 114392~|~1~|~1~|~01/NFP~|~District Preservation Funding -4PS7 (100% State) - No CAP - Superstructure replacement on SFN 4501942 LIC SR 37 25.10~|~13 - Bridge Rehabilitation~|~1A2E930F1DE9A9BB284A5E2B58C61B7D323E691E 88560~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing of the existing roadway in Miami County on State Route 571, County Road 25A SLM 13.42 to Northboud Ramps of Interstate 75 SLM 14.11. Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~12BE666DC5F807629ADC40D4D3EB8A3AA5EEEC9B 83947~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items on LOG SR 47 from SLM 0.00 to 5.23 and on LOG SR 706 from SLM 0.00 to 2.29.~|~05 - 4R Maintenance - Resurfacing~|~5ED8A09372C3834DDEE78E84122C5EDB44387206 97303~|~1~|~1~|~01/IMS~|~Provide new concrete overlay for bridge BEL-331-1529 (SFN 0705160) on Southbound lane and asphalt overlay on Northbound lane, to maintain Wearing Surface til bridge replacement Project is sold (PID 80599).~|~13 - Bridge Rehabilitation~|~B582AAC57B60C9496455062E7F4DCB21E70DE78A 113995~|~1~|~1~|~01/S<2/CCEO~|~"01/S<2/05/CCEO" -80% Federal (4B77) and 20% Local (4BG7) - resurfacing of CR 16 in urbanized area (SLM 1.88 - 3.30)~|~05 - 4R Maintenance - Resurfacing~|~C4FD73A758D86BAE0724B5CAE0D0EE35E8568CE8 113995~|~1~|~2~|~02/STR/CCEO~|~"02/STR/05/CCEO" - 80% federal (4B77) and 20% local (4BG7) - resurfacing and related work in rural area (3.30 - 6.27)~|~05 - 4R Maintenance - Resurfacing~|~03EF58370B9BC4C9C916CC448153CBA209B8EE36 122365~|~1~|~1~|~01/NFA~|~NEVI Round 2B Corridor Group US 23-A~|~~|~BBF8D3ADC112C71BDF2E38915ACDFB96CA010F7C 117007~|~1~|~1~|~01/S>2~|~Split for bridge repair work~|~~|~9C3B408F93650ECB4BAFEACA3C8BB9B71099E390 116087~|~1~|~1~|~01/NHS~|~Asphalt resurfacing~|~~|~E9E0525C571F527B496AC6CA518C220065B97345 116087~|~1~|~2~|~02/S>2~|~Asphalt resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9420DC14EC9E75A1D9B44AB8DF36C48F318944D4 116087~|~1~|~3~|~03/S5K~|~Asphalt resurfacing~|~05 - 4R Maintenance - Resurfacing~|~C9792AC9679542B6D85FD17C0CAF80A2B1C74B9C 116087~|~1~|~4~|~04/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8500FD58999604D2FBD3A844BF54A3A4FDC0B9DB 116087~|~1~|~5~|~05/NFA~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~3388646E4A51B5B777DA7DC39EF3DB82BAA860EA 87198~|~1~|~1~|~01/NHS~|~Asphalt resurfacing and pavement repairs on TUS-250 from SLM 17.32 to 21.41~|~05 - 4R Maintenance - Resurfacing~|~FD39E0A9678C7F88ACCD13197B6ABDFC5E6008F9 87189~|~1~|~1~|~01/STR~|~This split is for work outside the Lima Urbanized Area which is SR 81 from 3.31 to 10.72.~|~05 - 4R Maintenance - Resurfacing~|~401A8D84490A30F65AE19C93F7A93B82C6D8A413 87189~|~1~|~2~|~02/S<2~|~This split is for work inside the Lima Urbanized Area which is SR 81 from 10.72 to 14.47. Although this work is inside the Lima Urbanized Area, it is outside the City of Lima. Therefore, there are no local funds in this split. All funds are from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~5CDCF9877605A32AD1E165A75C45565158F2A124 116733~|~1~|~1~|~01/S>2/TRCE~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~55A02FBF983427C1E83309C4EB2EC9C145E67111 100477~|~1~|~3~|~03/S<2~|~ROS 104 11.23-11.83 20% local match~|~05 - 4R Maintenance - Resurfacing~|~3AA067B7F011E4F6AD268D091E6E7756A2D2D429 100477~|~1~|~2~|~02/S<2~|~ROS 104 (9.95-11.23)~|~05 - 4R Maintenance - Resurfacing~|~3FCCADAE76F24121D11D885F55624ABA21D9E3C2 100477~|~1~|~1~|~01/STR~|~ROS 104 (9.05-9.95)~|~05 - 4R Maintenance - Resurfacing~|~E6A4A5BC47E463CECA9E36F692D84FF320EDF747 100477~|~1~|~4~|~04/S<2~|~ROS 104 10.11 (SFN 7103573) ROS 104 11.55 (SFN 7103603)~|~47 - Bridge Preventive Maintenance~|~B79911C25FBCB680BC51032A163D132D476DFBA8 124179~|~1~|~1~|~01/BRO~|~Replace culvert carrying SR 93 over Branch of Brush Run~|~04 - Reconstruction - No Added Capacity~|~64BA5C1320E94FBD0917E8840B10D09DA0BC0192 117538~|~1~|~1~|~01/S5K~|~Roadway and drainage work along Ohio Ave. ~|~04 - Reconstruction - No Added Capacity~|~7442D277FF6225670B26B80AC2139CA1B93A01F6 117538~|~1~|~2~|~02/ENH~|~Sidewalk and curb work along Ohio Ave. This is using TAP funds.~|~28 - Facilities for Pedestrians & Bicycles~|~6F09D4CC0004EF24B97D7CBEA56A7C7B223D95A7 116413~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~75BD59CB667E2465E14FB9A531FC7FC583BC80EA 99584~|~1~|~2~|~02/STR~|~For bridges on SR-65 and SR-18~|~13 - Bridge Rehabilitation~|~1F1AD6CFBEBFFE3F3EC7CB5AB27E0865935C08BD 99584~|~1~|~1~|~01/STR~|~SR65 and SR-18~|~05 - 4R Maintenance - Resurfacing~|~5A2D8AE5422D74BC8CAE9E86BCB49564D29EC957 98862~|~1~|~1~|~01/NFA~|~Clark County full service facility.~|~44 - Other~|~C9791D82935C7459D0F8EE1A6C6F97446755E102 87675~|~1~|~1~|~01/STR~|~Culvert Replacment~|~44 - Other~|~F9D56A4EE17F09C7786AFC2C9999B4C93F04DE54 102007~|~1~|~1~|~01/S<2~|~SR 159 / Delano Road intersection improvement.~|~21 - Safety~|~B5AADF425EDBB15F64C9284285782C6B6E1AB3E9 113701~|~1~|~1~|~01/SAF~|~Install ADA Compliant ped heads and push buttons with audible warning and restripe crosswalks at the intersection of US-22 and Sherman Ave in the City of Norwood.~|~~|~53705B7A95BAD03F028BA536F81B70BCAC85F858 109448~|~1~|~1~|~01/IMS~|~Block PID for FY 2025 Drainage Structures throughout District 4.~|~44 - Other~|~146F06037BEC270B365E0D08B7D4DBED70B36F94 104486~|~1~|~1~|~01/S>2~|~Split for PM treatment on US-20~|~05 - 4R Maintenance - Resurfacing~|~055C3437492299ADB1381467F5E354218A2E79CD 120381~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~199BE0958BD29D57709D0974282B6CFE0555B596 91028~|~1~|~1~|~01/MPO~|~Marshall Road CR 60 0.00 - 1.04~|~05 - 4R Maintenance - Resurfacing~|~F41565158339A59764D8C953CF983FE3041E95D9 100160~|~1~|~1~|~01/MPO~|~80% federal w/20% local matching funds for project eligible work items.~|~05 - 4R Maintenance - Resurfacing~|~2A3C101A55B04FD3D0E43428B1A2308AB000D025 100160~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding.~|~05 - 4R Maintenance - Resurfacing~|~7E0201B55F49251B7F9CF165F4A89B00607C6146 101176~|~1~|~1~|~01/IMS~|~Smooth seal on Interstate routes~|~05 - 4R Maintenance - Resurfacing~|~F23859F134D1E96E40DCCBDC8B1D7437215AC77E 103927~|~1~|~1~|~01/NFP~|~Plan split~|~44 - Other~|~42CA0B62E00274D23CEE2407868ABCE116AB95D3 118279~|~1~|~1~|~01/SAF~|~ATH SR 56 Roundabout Project~|~21 - Safety~|~3ABB08376DFC289D5378145DFC83BF4C892F42CD 120069~|~1~|~1~|~01/NFA~|~NEVI Round 2 680-A~|~63 - Electric Vehicles & Charging Infrastructure~|~AE775F7D12BFFE84EDB114C1BBD0E720D83920C8 22854~|~1~|~1~|~01/BRO~|~Replace superstructure on one bridge in COL County (COL-14-0758, SFN 1501410) and raise bridge to meet Vertical Clearance requirements .~|~13 - Bridge Rehabilitation~|~7109329BDA6F64320091ADC73ACAE9E83BF380AF 107359~|~1~|~1~|~01/NFP~|~District 10 two year mowing project for CY 2024-25 along Interstates and Interstate look-a-likes (4 LN). Funded 100% state.~|~44 - Other~|~BB0C7DD598F458052CF8AC05349E9B878DC833E0 124652~|~1~|~1~|~01/BRO~|~Joint repair on two bridges~|~13 - Bridge Rehabilitation~|~7F65270E29F154DC585B7AC37973D6E6CDBA0678 111896~|~1~|~1~|~01/BRF/EPAL~|~Construction of bridge with 95% Municipal Bridge funds (4R87 includes 15% Toll Revenue Credit) and 5% Local funds (4BG7).~|~10 - Bridge Replacement~|~E5D83FDADCCDC4C4F7E0F8DBC76B0F0E436FFFE5 107582~|~1~|~1~|~01/NFP~|~Paint inspection Task Order~|~17 - Construction Engineering~|~DF65CE824CEB637841B18C7B7CDE2AD17BE03DF5 107725~|~1~|~1~|~01/STR~|~Two-Lane resurfacing asphalt overlay project using a Type C Letting procedure. WAS SR 60 5.20-19.73 and 21.03-24.09. This PID is programmed to repair work on PID 93877. 100% State funds.~|~05 - 4R Maintenance - Resurfacing~|~286FECF2FE108E17A86D2659628D276FA178052D 107241~|~1~|~1~|~01/NFA~|~Resurface the existing gravel lot with asphalt concrete (2.00 in.) - Auglaize County Heritage Trail Metro Park.~|~05 - 4R Maintenance - Resurfacing~|~E345B57D5DFDBC1551F0EDA10CDB710136AECAC4 94153~|~1~|~1~|~01/STR~|~Funding split for all costs associated with the stream bank stabilization along SR 725.~|~44 - Other~|~833EB4263FAF2D3EF8FFAFEE82CE9004AC20E1D0 94153~|~1~|~2~|~02/NHS~|~Funding split for all costs associated with the stream bank stabilization along SR 725 on NHS portion of the route.~|~44 - Other~|~19DEE1DE5E501CCE789678BFCC3F71DA4F6B2EC2 112826~|~1~|~1~|~01/STR~|~Resurfacing SR 93~|~05 - 4R Maintenance - Resurfacing~|~021B158B54CE9EAA9AC0FAB06DB9B6AF42C061BE 97420~|~1~|~2~|~02/NFA~|~Replace SFN 7843836 TRU-CR 237-00.41 Fenton Rd NW over Baughman Creek, Trumbull County, Ohio.~|~10 - Bridge Replacement~|~A1ADF4276569D40EA397A61964BAC29FD30460CC 97420~|~1~|~1~|~01/NFA~|~Replace SFN 7845073 TRU-CR 287-1.11 Barclay North Rd over Unnamed Stream~|~10 - Bridge Replacement~|~E448AF9E5B5F93F70367C83526FFED762793E2F0 97253~|~1~|~1~|~01/NHS~|~Concrete deck overlay on HOC 33 9.22 L (SFN 3700453) and R (SFN 3700488). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~62DA92D3843D9F989A58A811CC068D164027945E 126525~|~1~|~1~|~01/SAF~|~Plan split for all federally funded construction items. ~|~21 - Safety~|~F787686D87538FE9287698D6EC86B07C4BA80400 107301~|~1~|~1~|~01/CMQ~|~Upgrades to the existing signalized intersections of Montgomery Road with Highland, Plainfield, Sampson, and Elwynne. Access management improvements and upgrades to existing sidewalks for ADA compliance.~|~21 - Safety~|~F0C4BD0EBE3C273D4F110C824A01EA9A4E69EB61 107301~|~1~|~2~|~02/S>2~|~Resurfacing of HAM-22 through the Village of Silverton. HAM-22: SLM 9.26-10.18 and 10.18-10.21~|~05 - 4R Maintenance - Resurfacing~|~85A55A2BCBA64ACD84DC67FE29645E1ED8BCD041 98814~|~1~|~2~|~02/IMS~|~Split for repair~|~99 - State Preventative Maintenance~|~D8617E2AE81B061FF2B4D12948C7C96D831A78A7 98814~|~1~|~1~|~01/IMS~|~Split 1 for attenuators~|~44 - Other~|~47E4F95D94DC41F1B5799DA8841BE7F5977E66B7 110695~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~65588BFD4BC06B4AD822B2D134732DDD211D6BB8 110695~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~8991F32D7DDF58C46149241D02CAC731341C50CD 110695~|~1~|~3~|~03/S>2~|~Balance FY2026-1~|~17 - Construction Engineering~|~2F595B575A0DDEDBF8E6C7A81E16A5D4EF49EE70 114681~|~1~|~1~|~01/NHS~|~NHS plan split~|~05 - 4R Maintenance - Resurfacing~|~3EB5B03AC27A7EB58249E0B66426DCC791346094 114681~|~1~|~2~|~02/S>2~|~Columbus Urban Area plan split.~|~05 - 4R Maintenance - Resurfacing~|~130C7E1E193E85BB262B47F5E4C87B81B50C3D94 114681~|~1~|~4~|~04/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~968F36DB1CE32355C77A2761B69316EE4BA22521 114681~|~1~|~3~|~03/S5K~|~STP>5 plan split.~|~05 - 4R Maintenance - Resurfacing~|~8E047A5D3EF4692BB8A8351E44A94D94A5590BCE 91433~|~1~|~2~|~02/BRO~|~Bridge rehabilitation project. Pile encasement treatment for VIN 349 0057 (SFN 8203008). BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~05D9BC0CB799C7B8136991D023D49BB8F07ED8D2 91433~|~1~|~1~|~01/STR~|~Bridge rehabilitation project. Pile encasement treatment for VIN 278 0155 (SFN 8201811). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~405CA7B9B27F886DCF26F46D6CF58837C153A159 120184~|~1~|~1~|~01/SAF~|~Construct pedestrian improvements~|~21 - Safety~|~A1F6A61C241672B3533E801570295141E73B8C4D 102054~|~1~|~1~|~01/SAF~|~Improvement recommendation that will improve the safety and traffic flow of this intersection.~|~21 - Safety~|~9DBE15171707B30AA66D4B4538DAEC30C2A60A14 109116~|~1~|~1~|~01/SAF~|~bicycle rack installation work items that is eligible for federal-aid~|~~|~05A74F85F3D51576E5EE2ABBF0F0ED3EC56897E7 119752~|~1~|~1~|~01/SAF~|~Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with RRFB.~|~21 - Safety~|~FE255DE1630A0DFA0B60A08B9F8F6F71D1E256CA 112869~|~1~|~1~|~01/CMQ/TALL~|~Widening of East Ave by installing a center two way left turn lane, adding curbs and sidewalks in the City of Tallmadge.~|~04 - Reconstruction - No Added Capacity~|~F2834CDFC61BC5EE071249667CB56DDAA47C8174 115791~|~1~|~1~|~01/NFA~|~Plan split for federally eligible work items in Construction and CE~|~10 - Bridge Replacement~|~2908860E10D1072CC3194D7B3ED32F53297C6858 90659~|~1~|~1~|~01/MPO~|~WOO CR78 5.1-5.2 -- Poe Rd WOO SR64 3.58-3.59~|~21 - Safety~|~4E45557155A5E49A22F3DE436431D49622CB38BE 90642~|~1~|~1~|~01/BRF~|~Swinehart Ave Bridge SFN 7761503 over mud run~|~10 - Bridge Replacement~|~BF83E8154773DC167318334875728C0D29564660 108497~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. WAS CR 25 4.35. DSR WAS-011. Rural other federal aid funded 80 federal/20 local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D465124ECFF701232F25F763443620AE87294D8C 100846~|~1~|~2~|~02/S<2~|~ROS 138 0.27-1.74~|~05 - 4R Maintenance - Resurfacing~|~9071000B45F57FC4D67DFE885F7A61749203908D 100846~|~1~|~1~|~01/STR~|~ROS 138 1.74-10.87ROS 207 3.08-13.58~|~05 - 4R Maintenance - Resurfacing~|~1898117F850345E4E7D02800531BB96108C801E2 107852~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-38-8.24-8.95~|~05 - 4R Maintenance - Resurfacing~|~87D7E8B39D93A3365CB72DCED4EBBD46EBBFD7B2 96181~|~1~|~1~|~01/NHS~|~01/NHS/PV ; All work is in this split. Funding is 80% federa; amd 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FAC1BCB104858285F84081DFD3966FD70D973430 98209~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Replacement of RPM's throughout D-05.~|~21 - Safety~|~95FF8605768C2F2F299F2084E05603EDE4A896FD 93098~|~1~|~1~|~01/STR~|~Gap Project - Reactive Spot Paving/Repairs for MED-42-2.79 to 3.06~|~05 - 4R Maintenance - Resurfacing~|~9A1DEE19F0F28893336B5C1D4F87D952E2896B61 93098~|~2~|~2~|~02/NHS~|~Gap Project - Reactive Spot Paving/Repairs - MED-42-3.06 to 7.12, MED-224-10.45 to 15.30.~|~05 - 4R Maintenance - Resurfacing~|~7C12AD4300F92B829D0CD8A4C3134664C326BA2C 80127~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~3EF4F8C7DD15202C495E1DAFC7CF03DC49BD79DC 118575~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BEF6D7FFF949A2752E60DB16799AABA198888081 101372~|~1~|~1~|~01/BRO~|~Bridge replacement project. MEG 143 4.96, SFN 5302161 and MEG 143 15.20, SFN 5302102. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~D9A545C785893649CA05B57A40327F17B1D601D1 100968~|~1~|~1~|~01/IMS~|~Smooth seal IR 75 in Montgomery County: MOT IR 75 SLM 3.92 to 7.53~|~05 - 4R Maintenance - Resurfacing~|~5903C30BF6D1A251E52C3C0C7FB54546EEDD09A5 126697~|~1~|~1~|~01/STR~|~stp rural bridge plan split.~|~10 - Bridge Replacement~|~47D2456F76F7A2BE0DEA89AB22AB60385224B8F7 87179~|~1~|~1~|~01/NFP~|~Crackseal on FAY-22, FAY-753, PIC-104, PIC-188, UNI-42, UNI-31, UNI-37, UNI-739 ~|~99 - State Preventative Maintenance~|~08A0E065691174D9756597A6C30A55B61577A965 91320~|~1~|~1~|~01/STR~|~FUL US 20 7.82/10.24 Culverts~|~04 - Reconstruction - No Added Capacity~|~94D393070BB8FFE01A17B9DD734F1BD82BF01A2C 90935~|~1~|~1~|~01/SAE~|~SRTS Project (sidewalks)~|~28 - Facilities for Pedestrians & Bicycles~|~0B7EB6C809A2AB959432A7EA3CE2966B71FA6395 90935~|~2~|~3~|~03/SAE~|~Added Plan Split for eligible items but over the Fed Max~|~17 - Construction Engineering~|~950E4FC85BA0BD19BC9BB9709FBA1BAC0BC0FAD2 90935~|~1~|~2~|~02/SAE~|~SRTS Project (sidewalks)~|~~|~C4EB99993810A192BAAD7F80C72F83407C8D0075 97470~|~1~|~2~|~02/BRF/LCEO~|~"02/BRF/BR/LCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - Lic-CR 211-10 SFN 4531132 - BR Eligible for replacement: L=28'; SD/FO=1; SR=39.0; DSR=8;~|~10 - Bridge Replacement~|~719E01400E120F970BB2FE5069067D80EF62B2B3 97470~|~1~|~3~|~03/BRO/NWRK~|~"03/BRF/BR/NWRK" - Municipal Ohio Bridge Partnership Program Funding 5MP7 (80% Federal Municipal Bridge Funds) / 4BG7 (20% Local) with Toll Revenue applied - No CAP - LIC-BVIST-6001 SFN 4560507 - BR Eligible for replacement: L=46'; SD/FO=1; SR=33.2; DSR=4;~|~10 - Bridge Replacement~|~A114DDB48440B2F3D4C4C05ACF87820DF31DA381 97470~|~1~|~1~|~01/BRF/CCEO~|~"01/BRF/BR/CCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - COS-CR 19-9(County Road 19) SFN 1631578 - BR Eligible for replacement: L=25'; SD/FO=1; SR=29.3; DSR=7;~|~10 - Bridge Replacement~|~EEEB8F858B6F7C9B7538CFC8E2067C0F20E40719 125003~|~1~|~1~|~01/IMS~|~Plan split for interstate resurfacing~|~05 - 4R Maintenance - Resurfacing~|~C53C92079592CE1FC9435F5C83AF5EA55F77D429 126326~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~5D2BADFDC7A9F82E6610C17B90CE2E99800609D9 106561~|~1~|~1~|~01/NFA~|~Defiance County TID will construct a connector road in the City of Defiance to provide access to Latchaw Drive.~|~01 - New Construction~|~9B78447C06C11E104F375DE854946B81A86ED064 110811~|~1~|~1~|~01/NHS~|~Split for federally eligible work~|~13 - Bridge Rehabilitation~|~14C5C1639D34E00E044F8231792DCBF510364303 108976~|~1~|~1~|~01/SAE~|~100% Safety Plan Split~|~21 - Safety~|~A9FA4BFF106E4506FCE6CB9EFD71CE703A4D8B70 102156~|~1~|~1~|~01/S>2~|~Sidewalks~|~01 - New Construction~|~969EE206331EDD337941B08CCAB43C9468E3DE16 111563~|~1~|~1~|~01/BRF~|~Muni-Bridge funded items~|~~|~00379C2938B223A564B5F29BE7E3D8C0E81749A4 92957~|~1~|~1~|~01/SAE~|~guardrail construct/replacement project~|~21 - Safety~|~5D152E6082DFB41C865973A83E83D8D47D816850 113549~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail on various county roads.~|~21 - Safety~|~E1356051322B2C030B2B1264A74464397318B6FF 126794~|~1~|~1~|~01/NFP~|~Mowing various locations in Franklin County~|~99 - State Preventative Maintenance~|~2A6534DD3079FE946A38A519572B88D6B75AF847 108314~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER Event. DSR# BEL-021.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~591FEF24F91628330C38B39621AD3755A5751C72 97933~|~1~|~1~|~01/NHS~|~All roadway work to place an asphalt overlay on SR 844 and all ramps.~|~05 - 4R Maintenance - Resurfacing~|~4D50F80EB755B98AB34CC09704B684CBD8B14ED7 97933~|~1~|~2~|~02/NHS~|~Plan split to include all costs associated with the mainlin bridges including approach slabs.~|~13 - Bridge Rehabilitation~|~7FF36B95BBB8D5D604952AF9C107F40DAA26BBE4 82441~|~1~|~1~|~01/IMS~|~Pavement planing and resurfacing with asphalt concrete from US 40 to the MIA/MOT County Line MOT-IR-75 21.410 to 24.420 18.060~|~05 - 4R Maintenance - Resurfacing~|~1D3C369B7BADF992DFDCFB7237B51B3524A77632 94207~|~1~|~1~|~01/BRO~|~Replace existing deck on bridge JEF-150-0510 (SFN 4102169) with a new composite deck. Convert the abutment to semi-integral and paint structural steel. Provide new approach slabs and repair/modify substructure units as necessary.~|~13 - Bridge Rehabilitation~|~0B50F565400F658436D8F4DAC7DC6B0A84290AB1 125477~|~1~|~1~|~01/MPO~|~OKI STBG (4TA7/KI08) 70/30 plan split for eligible items. ~|~21 - Safety~|~6A7623AEDC246EE41BDF7A259E46D7F041C9E192 116485~|~1~|~1~|~01/NFP~|~PM (A) FY28.~|~21 - Safety~|~3D491EE5D6545E647447469EF2813A09840A2596 91018~|~1~|~1~|~01/MPO~|~Resurfacing Glenwood Ave from Falls Avenue to Warren Avenue by MPO STP funds~|~05 - 4R Maintenance - Resurfacing~|~18F77C198B11A7CF85402D8FF092F99DFA5ED453 111981~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2024. Funded 100% state.~|~21 - Safety~|~E9325CD2EA8B59D4697A605FAF57C8E13A9C7F65 106979~|~1~|~1~|~01/S<2/ZANE~|~City of Zanesville STP Funds -4TA7/ZA05 (80% Federal) / LNTP (20% Local) - No CAP - Resurfacing project in the City of Zanesville on CR 34 from 7.18 to 8.08.~|~05 - 4R Maintenance - Resurfacing~|~23CC2326C4858098F0D9BBCF5EFDEC60742316AA 106979~|~1~|~2~|~02/ENH/ZANE~|~City of Zanesville Transportation Alternative Funding - 4B37 (80% Federal) / TRC (LNTP 15% Local) / LNTP (5% Local) - See CAP Comments - Project for construction of sidewalk and curb along Ridge Ave from West Main Street to Hedgewood Ave, skipping a section from Brighton Blvd to Mead St.~|~28 - Facilities for Pedestrians & Bicycles~|~ABBF2509B81536DF444AD6F30131212E55F07356 118165~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~5C18A96A7BFE089B096FB2F7364F07A6677AA0FA 110253~|~1~|~1~|~01/MPO~|~WEST MAIN STREET (SR 41) CORRIDOR IMPROVEMENTS~|~03 - Reconstruction - Added Capacity~|~6C037921E450C85394522DE5BC9F3BF0A08027ED 110253~|~1~|~2~|~02/S>2~|~overlay work on MIA-41 SLM 10.32-11.14 covered under UPP funds~|~05 - 4R Maintenance - Resurfacing~|~DEE944CC6E5264A5AEF4A64D4B954D9E2E23BB2D 116849~|~1~|~3~|~03/S5K~|~Asphalt Concrete Overlay with Repairs WAY-83-8.086 to 8.868; WAY-302-0.00 to 2.013100% Local Funds~|~05 - 4R Maintenance - Resurfacing~|~013C27EA975364252BF645732FD905C831A8F234 116849~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with Repairs WAY-83-8.308 to 8.581 (SB only); WAY-83-8.677 to 8.868 (SB only); WAY-302-0.056 to 0.478 (SB only); WAY-302-0.688 to 0.728 (SB only)Fed/State Funds~|~05 - 4R Maintenance - Resurfacing~|~45BBA2D066F2E531C302BAFE5A3A2C1BF4E911BD 116849~|~1~|~2~|~02/S5K~|~Asphalt Concrete with Resurfacing WAY-83-8.086 to 8.868; WAY-302-0.00 to 2.013Fed/Local Funds~|~05 - 4R Maintenance - Resurfacing~|~228265234821553491EFE726D4C00EE99EF9AE13 101048~|~1~|~1~|~01/IMS~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~2D719550AD9E9EA988966D34CAAE437DCCDCE41B 119881~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-A~|~63 - Electric Vehicles & Charging Infrastructure~|~D434076882684A9F2B0E344E70CD2B29B12F72BF 84490~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~13 - Bridge Rehabilitation~|~FAD4814DA502B360A860A272773E41A9C6DEA899 105764~|~1~|~1~|~01/STR~|~Culvert Plan split~|~04 - Reconstruction - No Added Capacity~|~BD244339242DAE6602713CADB56A30759B9F9658 92926~|~1~|~1~|~01/ENH~|~Project consists of four primary objectives: (1) Decorative corridor lighting along SR-122, (2) Landscaping beds in the four quadrants of the IR-75 and SR-122 interchange, (3) Ornamental and shade trees, and (4) Gateway pylons along SR-122.~|~31 - Landscaping & Other Scenic Beautification~|~35AB425926495D0D970EA547A9EBDF9ACE045EB8 116288~|~1~|~1~|~01/NFP~|~Fence repair and maintenance on various routes throughout district 4.~|~21 - Safety~|~BAE62B87158F9A5EA674C838D0A504C18306F7D6 81361~|~1~|~1~|~01/BRO~|~8630534 WIL CR309 0.38 Intersect: 12630 Rdd Lick Creek Cen~|~10 - Bridge Replacement~|~9D405B40EC0365143DE87CF4C4E67B17D89DDE3D 95248~|~1~|~1~|~01/NFP~|~Culvert replacements. STA-43-21.40, STA-172-28.50, STA-183-14.87, STA-183-22.50, STA-212-3.24.~|~44 - Other~|~D353AE6B1BD09572309D3EDD5199E55156F0506A 95574~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation - ASD-042-12.46New Construction?Superstr repl (003)~|~13 - Bridge Rehabilitation~|~513E0BD12CF52D41CFA5582A65927A77300993AC 121549~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~155695E3B622E64DCA63EB1DDF427EE9833EC2E2 123606~|~1~|~1~|~01/NHS~|~Plan split for deck replacement of a bridge over NHS non-interstate expressway~|~13 - Bridge Rehabilitation~|~EA3924E70DD0FEFFF6B2A3CE2C98014D4381B63D 124550~|~1~|~1~|~01/SAE/LOR~|~Install a single-lane roundabout at Bainbridge and Root Roads~|~21 - Safety~|~378E831F28697589EB191B2B7D6314C5BA56CA27 126427~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs ERI-2-20.023 to 24.503~|~05 - 4R Maintenance - Resurfacing~|~C59FE1A37E5B7EE9230DC49E2308BFE073D9F055 126427~|~1~|~2~|~02/NHS~|~Bridge overlay and bridge maintenance on bridges along ERI-2-20.023 to 24.503~|~47 - Bridge Preventive Maintenance~|~D3DFA1819F6F15A0417796F98F8C06BE3A146E90 112941~|~1~|~1~|~01/NHS~|~US 36 from 12.45 to 18.39 (excluding urban portions)~|~05 - 4R Maintenance - Resurfacing~|~1A32B30B08AF875BC6EC2A76738B85D01BCEA24B 111649~|~1~|~1~|~01/SAF~|~Applying pavement markings to approximately 20 miles of various Clermont County roads.~|~21 - Safety~|~D7AB3912FC1B1866F5291F1AEA7D0C8EDB50A3DE 87020~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping.~|~21 - Safety~|~8C17E60FAD51B43A44DE25126C2DC770086CD80B 86208~|~1~|~2~|~02/STR~|~Structure Replacement SFN 6501982, PIC-104-3.45 over Lick Run~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1419885915B72D9A65628CC6B877FBA3971B580A 86208~|~1~|~1~|~01/STR~|~Culvert replacement PIC-104-2.95Culvert replacement PIC-104-3.82~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~71A4D8639F8A806D8BABEBE5253AA5D27BFF85DF 86208~|~1~|~3~|~03/STR~|~Resurfacing of pavement between culverts~|~05 - 4R Maintenance - Resurfacing~|~ECE07DA3867B376198C081E69BB1912AACB1C3AE 112996~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~13 - Bridge Rehabilitation~|~55065F6BF44CAB88C8AEC7C43CF9CA2B20385E4E 112996~|~1~|~2~|~02/BRO~|~Plan split for charges to utility company for carrier pipe removal~|~13 - Bridge Rehabilitation~|~8FC5C58BFAE8B246C84BBCE82A6102C018B5A259 99032~|~1~|~1~|~01/SAF~|~2019/2020 Traffic signal maintenance~|~21 - Safety~|~197D24CAB95D3018F863B45F8255CBDDC0AB40C5 120399~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DAC8338C9FA44F9EDFDFCFD2E3491C3DB97DEA22 122897~|~1~|~1~|~01/ENH/NILE~|~Streetscape improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~5B7F47D89B77F8C285B2330B127669775D9B6E26 116886~|~1~|~1~|~01/SAF~|~Construct Roundabout~|~21 - Safety~|~F3995BD07603E9DC712BE9B260A3F429F8829B6A 114808~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~0FB0A15D2DE88F92AB72E75D4E443DBC643C2D56 115498~|~1~|~1~|~01/NFA~|~Fernwood State Forest resurfacing~|~05 - 4R Maintenance - Resurfacing~|~F1EF9390F902ACDA1CEDB1D6B60E57FDA77D83A3 98764~|~1~|~2~|~02/ENH~|~Installation of sidewalk along Sycamore Road throughout the project limits.~|~28 - Facilities for Pedestrians & Bicycles~|~74F9F3043721C78BE9C1393258DD68B3503E76A2 98764~|~1~|~1~|~01/SAF~|~Improving three intersections along Sycamore Road; (1) Kenwood Road, (2) Blue Ash Road, and (3) Plainfield Road. This work will include a modern roundabout at Sycamore Road and Plainfield Road, as well as some vertical profile improvements at Kenwood Road and Blue Ash Road, and drainage improvements.~|~21 - Safety~|~F5E113CC9C9F52E1446E888D33F6AB3A299647B3 98764~|~1~|~3~|~03/NFP~|~Plan split for Greater Cincinnati Water Works (utility) upgrades being constructed in conjunction with this project.~|~43 - Utilities~|~102B7E5B0882C5E8E0DA543A6D01DCB987B3760B 124368~|~1~|~1~|~01/NFA~|~Village of Centerburg Downtown improvement project.~|~28 - Facilities for Pedestrians & Bicycles~|~4D59B1FB14ABD252E9885B27D93F74790C748179 91056~|~1~|~4~|~04/STR~|~Bridge deck overlay (SRS) on SFN 6501176 and 6501273~|~13 - Bridge Rehabilitation~|~DB529C8F3CC42EE26E067FC43E592A557651F9BA 91056~|~1~|~5~|~05/NHS~|~Bridge deck overlay (SRS) on SFN 6500358~|~13 - Bridge Rehabilitation~|~B60EDEC7C268127014C8191C4C2A1CB2B7072E07 91056~|~1~|~6~|~06/NHS~|~Install dilemma zone and stop bar detection at the PIC US 22 at SR 56 intersection~|~21 - Safety~|~BCE3A82AD425FB5D8EF27B0B3045A301C874CAC8 91056~|~1~|~1~|~01/STR~|~Resurfacing PIC SR 56 SLM 0.00 to 17.23. Pave over structures PIC-56-4.01, PIC-56-4.65, and PIC-56-12.67~|~05 - 4R Maintenance - Resurfacing~|~B31310E01C6A9F75BDDAEE4974B245F2916D6053 91056~|~1~|~2~|~02/S<2~|~Resurfacing PIC-56 from SLM 17.23 to 17.36.~|~05 - 4R Maintenance - Resurfacing~|~8506E032974E0075061D306E028312FDED1D2800 91056~|~1~|~3~|~03/NHS~|~Resurfacing PIC-22 from SLM 16.05 to 16.99. Pave over structures PIC-221-6.12 and PIC-22-16.29~|~05 - 4R Maintenance - Resurfacing~|~C379DDA10DAF056DAB686904C4B5EDCECFCDBA9B 91056~|~1~|~7~|~07/STR~|~Remove PTSWF signs and install dilemma zone and stop bar detection at the PIC US 22 at SR 104 intersection. Install dilemma zone and stop bar detection at PIC SR 56 at SR 104 intersection.~|~21 - Safety~|~C77FEB53F98940478FC12AB392EB52624E11DD33 80408~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for all work using TRAC funds.~|~08 - Bridge - New Construction~|~543275BA6AA45D2D30C8ABA85CAEBDBCE24993C5 122859~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing of Maco Avenue/Lamar Hunt Way & Entry Drive, and around sheep exhibit building. ~|~05 - 4R Maintenance - Resurfacing~|~F9076B872567F1A46E561FF1DF5A4714455A3229 122859~|~1~|~2~|~02/NFA~|~Parking lot reconstruction south of the main entrance parking at the History Connection.~|~05 - 4R Maintenance - Resurfacing~|~F172730CF611DC8E4DD71CC6CB02F18077080A3B 101557~|~1~|~1~|~01/S<2/COSH~|~"01/S<2/PV/COSH" - Appalachian Regional Commission (ARC) Funds 4D37 (100% Federal) - CAP $299,992.00 - City of Coshoction resurfacing of Otsego Avenue - CR 91.~|~05 - 4R Maintenance - Resurfacing~|~9AAC2937CAAC5C8FAD83F2F70A9EE37181B163F2 110788~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~40737BCB53B995A3241AC852290143A5D50E3E3D 113077~|~1~|~1~|~01/NFP~|~Replace Culvert~|~17 - Construction Engineering~|~4F1154CF91FEF6192F8BA1895E06F6CF9CFA7D31 123637~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~157BB9D34C37BCF48B8F22B0FC7FB1ED98D955ED 123637~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment.~|~17 - Construction Engineering~|~BCD16D2BE546B18DFDCF211A1FE3D72C2E0D9293 123637~|~1~|~3~|~03/SAF~|~Shoulder widening on MEG 124 22.49-36.85 using Safety funds. 90% Federal/10% State.~|~21 - Safety~|~4A22A72428DE4F108349D5E6CFBA7AC9CB6A2149 99201~|~1~|~1~|~01/STR~|~LAW CR 15 1.20-5.92LAW CR 18 2.36-2.40~|~05 - 4R Maintenance - Resurfacing~|~54047D4EAE6A3C5BC4BAFE6BF8485B0239714269 99201~|~1~|~2~|~02/S<2~|~LAW CR 15 0.00-1.20 & 5.92-8.54LAW CR 18 0.00-2.36~|~05 - 4R Maintenance - Resurfacing~|~0ECDF52795BFD587BD99ED5C7CA2AAF196E21960 123489~|~1~|~1~|~01/NFP~|~plan split.~|~44 - Other~|~71E0CFC775261F242DC000935311FFCA5E577C91 92637~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance Funds for Herbicidal Spraying for 2 years.~|~~|~8CD5C86D95E19CF30A5F171DE5B49FF18B03EA7A 117909~|~1~|~1~|~01/NFA~|~NEVI Phase 1, I-71-A, CLI 45-69~|~63 - Electric Vehicles & Charging Infrastructure~|~91B1F5AAA5F8946D91529C7E856C1564E9CFF33F 92688~|~1~|~1~|~01/NFA~|~01/NFA/PV/ - District Preservation 4PS7 (100% State) - No Cap - Resurfacing on SR701 from SR309 to US68.~|~05 - 4R Maintenance - Resurfacing~|~0C0A4E8594FDB601953EE6CF041F13D1BAFC0C08 110405~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~2FE83CF535A8C3E78A8A1FE8387488EE713A9B80 107726~|~1~|~1~|~01/STR~|~Type A Emergency slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F5AA9916E16ECCB83F9C9080F00976622E58206C 105540~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MAD-71-0.00-4.50~|~05 - 4R Maintenance - Resurfacing~|~47560654D8D15A76D5FEEA61D855869077F75E25 105540~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: MAD-56-6.19-6.20 & 6.35-6.95~|~05 - 4R Maintenance - Resurfacing~|~8F476645B0ECC24F2FB1CB59F8549CA415FB1496 105540~|~1~|~3~|~03/STR~|~Rural Plan Split: MAD-142-11.21-11.44 MRW-229-6.50-15.28 UNI-347-0.00-4.22 UNI-42-0.00-4.84~|~05 - 4R Maintenance - Resurfacing~|~4E1EF248FDCE34D3BB57F9121F8CF0E5B1C4BA08 105540~|~1~|~4~|~04/NHS~|~NHS Plan Split: MAR-309-18.79-19.51 & 19.68-20.22 PIC-03-2.94-3.86~|~05 - 4R Maintenance - Resurfacing~|~898F526D77DDD884D9EBE77FD8C90EBD58531E51 116322~|~1~|~1~|~01/NHS~|~All work associated with widening SR 161 and I-270 NB/WB~|~03 - Reconstruction - Added Capacity~|~DAB82B2702BD6F5D0D57C0BC0E79EE2B45CB23CB 116322~|~1~|~2~|~02/NHS~|~Work to repair damage caused by vehicle accidents~|~44 - Other~|~5F98F6DCC58A014B5FEB6E05648D745F15764331 114465~|~1~|~1~|~01/NHS~|~Resurfacing US 22~|~05 - 4R Maintenance - Resurfacing~|~47BC3C784B9CE7C29A86A58343E14B214B34EF0E 110033~|~1~|~1~|~01/NFP~|~Construction of parking lot on the East side of the Western Reserve Bike Trail at Rome Rock Creek Road, in the Village of Roaming Shores, Ashtabula County, Ohio.~|~44 - Other~|~FECAC242ED0B2685F7E11614964EDA579F08D8A1 119379~|~1~|~1~|~01/S>2~|~Trail safety improvements and enhancements ~|~28 - Facilities for Pedestrians & Bicycles~|~6654C0A92892ACC4E50065F36C0852D90129ACAF 100746~|~1~|~1~|~01/BRO~|~Work to replace two bridges. Funding from District Preservation Program budget using SACs 4PF7 and 4PS7.~|~10 - Bridge Replacement~|~7E460E7891C533122C751D8D83B2151C9A34DA2B 100746~|~2~|~2~|~02/STR~|~Work to replace existing culvert with a new culvert at SLM 19.88. All work from the District Preservation Program budget. Work designed with PID 106401.~|~04 - Reconstruction - No Added Capacity~|~2CF2C397776781439139FF2944597A569E7FB6F5 100746~|~2~|~3~|~03/BRO~|~Work to rehab a bridge designed with PID 106401. Funding from the District Preservation Program budget using SACs 4PF7 and 4PS7.~|~10 - Bridge Replacement~|~DE0A4A454D0D75623D1092B61076EA793EA8F007 122346~|~1~|~1~|~01/SAF~|~DEL 750 from 6.667 to 6.779 and DEL14 from 0.00 to 0.038~|~17 - Construction Engineering~|~0C60B030CEF14FDCEAA38553158F7CBA7855DF09 90834~|~1~|~1~|~01/MPO~|~Installation of trees with decorative tree grates, installation of decorative lights, removal and replacement of sidewalks and existing pavers, removal and replacement of drive aprons and upgrade of bus stop with street furniture on National Road Streetscape Phase 5 project.~|~21 - Safety~|~C44E8E62AC0AC3F0A94FC77BBAA3FC4DC7D1E4CE 92691~|~1~|~1~|~01/SAF~|~Intersection Improvement~|~21 - Safety~|~30BA8A85FF5EBEAC953A7D89C256A7245B3384D7 92691~|~1~|~2~|~02/SAF~|~Medina County Sanitary Engineer Water Work Items~|~21 - Safety~|~B8EEDE84C38670FF552673B6BD9B4531389A590C 89425~|~1~|~1~|~01/IMS~|~Guardrail Maintenance/Repair~|~44 - Other~|~D2660B29EA1D9E29669D3A6E9C4044E04FA10973 125130~|~1~|~1~|~01/STR~|~Bridge Replacement on SFN3005437~|~10 - Bridge Replacement~|~5429164900AB61D1996BCC27D88EF3D33F87ACFF 115388~|~1~|~1~|~01/NHS~|~Plan split for bike/ped improvements. Construction of a new shared use path connection between the Little Miami Scenic Trail, across US 68 via a new pedestrian bridge, and into the new Great Council State Park.~|~28 - Facilities for Pedestrians & Bicycles~|~FF76919CE570FA95A5C800EB3D51FD7FCE8CD57B 115388~|~1~|~2~|~02/NHS~|~Plan split for roadway improvements to US-68 in the limits of this project, including the intersection with Brush Row Road.~|~04 - Reconstruction - No Added Capacity~|~EA48B598C22AE71C56967FBF9057FE331FDA2DC3 91965~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of CAR-9-21.82 to 28.08 and COL-9-0.00 to 0.98; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~CAB51FBE6BC250D2497094A347FBFE15C1C8BFE5 114497~|~1~|~1~|~01/S>2~|~This plan split includes all roadwork needed to construct the separated, multi-use side path.~|~28 - Facilities for Pedestrians & Bicycles~|~254E45BC502493CF101CB969F29921FBC2137404 88897~|~1~|~1~|~01/IMS~|~Replace existing superstructure (BEL-70-1336, SFN 0702374) with a new steel beam superstructure. Repair substructure units and convert abutments to semi-integral.~|~13 - Bridge Rehabilitation~|~1A6CDA2FC07A694169FD2CFCC7B9816154375A9B 92013~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~8002BED19950F0272ABE9A2E5D46706505FB60A8 92013~|~1~|~2~|~02/BRO~|~District staff involved with the Construction inspection~|~17 - Construction Engineering~|~44C45BB0B5C97433CD1A592A5B3A04A3413112D7 92013~|~1~|~3~|~03/BRO~|~Added $150,000 for ongoing services for the design consultant of the subject project. It would likely be encumbered in $50,000 increments.~|~17 - Construction Engineering~|~C7792809882BF0F0AC1A41834A624DD7A7D788E0 92013~|~1~|~4~|~04/BRO~|~Ongoing services during construction~|~17 - Construction Engineering~|~4CE5FA0749DFC00649A39AEFFBFC5874CA951B7D 92013~|~1~|~5~|~05/BRO~|~Ongoing services during construction~|~17 - Construction Engineering~|~3562DB9B0462E9B69B0ACB9A1A3EC31319E73D81 92013~|~1~|~6~|~06/BRO~|~Ongoing services during construction~|~17 - Construction Engineering~|~155F3365946D3D7CFE70D12C854D2BE0DD0B820E 92013~|~1~|~7~|~07/BRO~|~$100,000 total for ongoing services for the design consultant of the subject project. It will be encumbered in $25,000 increments. this split will be used for Balance total. it has $75,000 left. COCE Ongoing 05 split will have the $25,000 encumbered amount to make the total $100,000.~|~17 - Construction Engineering~|~4A3BD5DB8709979E349C2204E696E1B8104A0823 92013~|~1~|~8~|~08/BRO~|~The subject project requires additional funds to extend their contract to project completion. The project experienced unanticipated delays and needs to keep inspection staff on site longer than originally planned.~|~17 - Construction Engineering~|~305F236D5F4F81CBA9D0BCE97FFC9FCEDA80EE80 92013~|~1~|~9~|~09/BRO~|~The estimated funds needed for HDR to complete the items is $20,000. The process to coordinate the remote operation testing between ODOT Central Office IT, District 2, Centurylink, and Perram .~|~17 - Construction Engineering~|~0FC775603CE9C0BBA5088263E0ABB05E32188B13 92013~|~1~|~10~|~10/BRO~|~The estimated funds needed for HDR to complete the contract is $25,000, there mechanical and electrical expertise provided by HDR is needed.~|~17 - Construction Engineering~|~C25F097744D135EAB032DF4DDBD064574471FED2 98641~|~1~|~1~|~01/BRO~|~SFN 1100025, CHP-4-0217 on Buck Creek - replace highly skewed non-composite concrete box beam superstructure with new concrete slab deck superstructure provided the existing substructure can accomodate this change.~|~10 - Bridge Replacement~|~50D1DF70477EE9A044D334A496BF80F86DDA6E7E 97132~|~1~|~1~|~01/SAE~|~District Wide contract for PM/RPM in District 8 for FY2018~|~21 - Safety~|~BC1DFFDC60226230DF8C4E656E86A2CD2F16F8B4 95990~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation Paving 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-37-(25.08 to 25.84) and Fai-37-(00.00 to 09.73)~|~05 - 4R Maintenance - Resurfacing~|~25F63A40CCBEC08AD1742F5C3FDFB64B91092CE1 95990~|~1~|~2~|~02/S<2~|~"02/S>2/PV/ " District Preservation Paving Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Fai-37-09.73 to 10.40~|~05 - 4R Maintenance - Resurfacing~|~59250D90FA905CDC5320F47AA9940E088C624B9B 95990~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " District Preservation Paving Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Fai-37-10.40 to 12.82~|~05 - 4R Maintenance - Resurfacing~|~7A72580181583BBA3F3FECEFFE9354BBD20A99A0 104293~|~1~|~1~|~01/NFA~|~ADA CR 10 0.14 (SFN 0136840)~|~10 - Bridge Replacement~|~538F624F237BF0F9B1E62B3D5942AAEB952FA8D3 92406~|~1~|~2~|~02/STR~|~Minor bridge work on 2 structures - not BR eligible:SFN 6502989, PIC-316-1.68 over Dry Run CreekSFN 6503020, PIC-316-4.31 over Big Darby Creek~|~13 - Bridge Rehabilitation~|~55E2F3DB7FDFB0460D203D6CD9CBB170CBD5562C 92406~|~1~|~1~|~01/STR~|~2 lane resurfacing and shoulder work from SR 56 to SR 104~|~05 - 4R Maintenance - Resurfacing~|~689F45843C530C19C39E76B03BAFC96046956A80 92664~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete from SLM 8.58 North Corp Limit of Ansonia to SLM 12.42 South Corp Limit of Rossburg.~|~05 - 4R Maintenance - Resurfacing~|~32A61369C13DE4EDF168BAFF4217A4540C77CCF0 121390~|~1~|~1~|~01/IMS~|~All Work is within this split~|~21 - Safety~|~ECCE8EA8D1F9DE608D195951B23F1B5C5F22691B 93300~|~1~|~1~|~01/NFP~|~Sanitary sewer work at the Morgan County Garage.~|~~|~60B17B40B4757AB43E2025C4D67CDDA6F5008292 115447~|~1~|~1~|~01/S>2~|~This plan split includes all work required at the intersection of Cornell Rd at Maple Street - installation of ADA compliant curb ramps, high visibility crosswalks, flashing stop signs, and school zone pavement markings and signage.~|~28 - Facilities for Pedestrians & Bicycles~|~5447199B4E8C35810EFB9D234FE056E57CC257CD 104998~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (100% State - No CAP - Project to repair and replace damaged Guardrail District Wide~|~21 - Safety~|~6419FD4D08F31EF5EAF25B2BF315E3FEAD6BAE3C 83287~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 5BP7 (80% Federal) / Plus TRC for 20% Local match- Replacement of Muskingum County bridge SFN 6037224 carrying CR41 over Moxahala Creek: BR Eligible Length = 120; SD/FO(1); SR = 15.8; DSR = 3~|~10 - Bridge Replacement~|~3E3D42BE8D08D054015806C931CA53C5E4B55290 102980~|~1~|~1~|~01/IMS~|~Fine graded polymer AC overlay on IR: IR 75 SLM 16.35 to 18.24~|~05 - 4R Maintenance - Resurfacing~|~FC7EEEE105A448874ABC42091360D14C2FF3D1F8 99696~|~1~|~1~|~01/S>2~|~Split for resurfacing work for the entire project funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~0CE88B614E01AFC630B46F4E6EEDD7E13A7DB52E 84620~|~1~|~1~|~01/IMS~|~Pvmt work on I-270: 31.70 to 36.94~|~05 - 4R Maintenance - Resurfacing~|~F6CBDB740FB802BCC6D3E2AF8FC92CEDD6AAFF6B 84620~|~2~|~3~|~03/SAF~|~Widen IR 270 between IR 670 interchange and bridge over Big Walnut Creek~|~21 - Safety~|~F2F27790B305FAF20E50F00719B7ACBAB2B71AFD 84620~|~2~|~4~|~04/SAF~|~Raise Goshen Lane structure over IR 270 due to widening~|~21 - Safety~|~EE1C0BFAA877F3254A967E2D4A813BB5B6B4FF52 84620~|~2~|~5~|~05/IMS~|~Goshen Lane structure minor repairs and painting of structural steel~|~13 - Bridge Rehabilitation~|~E22C6AFD4500BDC49FAADAF07B521F3B99C36CA4 84620~|~1~|~2~|~02/IMS~|~Bridge work on 3 structures:2512289 & 2512297 FRA-270-32.37 L/R over Morse Rd2512092 FRA-270-34.87 under Agler Rd~|~13 - Bridge Rehabilitation~|~E11218D62043EBA4ACE010FA31E4107EB84DB0BE 84620~|~1~|~6~|~06/IMS~|~Work to repair roadside safety equipment damaged by traffic~|~05 - 4R Maintenance - Resurfacing~|~2CA78244C5752E34BAF21EEE0A8703DDA75125C4 76738~|~1~|~2~|~02/BRO~|~Bridge patching - noted in project description as other roadway related items on US 33 SLM 4.21.~|~05 - 4R Maintenance - Resurfacing~|~6C59C91D25E8447BE2A1EF0E27A83FEF177EC10E 76738~|~1~|~1~|~01/NHS~|~Resurface the existing roadway with asphalt concrete and other roadway related items on AUG US 33 from SLM 2.79 to 6.60 (segment length 3.81 total lane miles 13.90)~|~05 - 4R Maintenance - Resurfacing~|~ED69111FBDC0B606AB04A01B6B3BB2B3D03687AB 124634~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 60.34 (SFN 5301963).~|~~|~6D89E0C6DE341BE62894542486845D6549F44F65 99699~|~1~|~1~|~01/NHS~|~Resurfacing work along SR-8 in Highland Hills~|~05 - 4R Maintenance - Resurfacing~|~060002FBB84CB086EBD0D0F2C6EB69D1EFCA8C55 125767~|~1~|~1~|~01/S>2~|~Plan split for large urban locations~|~47 - Bridge Preventive Maintenance~|~975DA9BA0C5581BCA39D621DD47E69E4A7F928AF 121132~|~1~|~1~|~01/SAF~|~Guardrail locations in D8~|~21 - Safety~|~F1E0A46D0F0345C19E8C09398F69D21DEEFA740F 112233~|~1~|~1~|~01/NFA~|~D09 Bridge Maintenance FY26~|~47 - Bridge Preventive Maintenance~|~2C27D05D6557DDED613371123400A1473925BFB7 91729~|~1~|~1~|~01/NHS~|~Rehabilitate Bridges WAR-73-1818 L/R over Caesers Creek by painting the structural steel, replacing abutment bearings, patching wearing surface, patching parapets, and replacing bridge end terminal assemblies. SFN: Left: 8303010 and Right: 8303029~|~04 - Reconstruction - No Added Capacity~|~0171F4E64A582AFEB1ACAB5692292AF4038339EA 121242~|~1~|~1~|~01/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~E61A0C6756B282331C76B043AECA07F772562B48 127208~|~1~|~1~|~01/NFA~|~Resurfacing of the Hockhocking Adena Bikeway extending from the Beaumont Trailhead in The Plains to Minker's Run Bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~1310FD18EE533BEA617EF17CADDF65B2DAA8BE42 80006~|~1~|~4~|~04/STR~|~Rehab bridges. 7306091 SCI SR00522**C : 4.940 Rehab Rural 7306121 SCI SR00522**C : 5.200 Rehab Rural 7306148 SCI SR00522**C : 7.140 Rehab Rural80/20 split ~|~05 - 4R Maintenance - Resurfacing~|~01F4128F04FC682ED24FBBBDF7A3700801A7BD0B 80006~|~1~|~5~|~05/NHS~|~Bridge Rehab 7306008 SCI SR00522**C : 0.220 Rehab NHS 80/20 split~|~13 - Bridge Rehabilitation~|~253B6C7DAE8B4412F60AF2ACE38DC3DD57E1B79F 80006~|~1~|~3~|~03/S<2~|~Begin @ US52 north and terminate at the Lawrence County line. It is proposed to resurface the existing highway with asphalt concrete. Location: 0.61 - 2.5980/20 split7306016 SCI SR00522**C : 0.620 Pave Thru Urban~|~05 - 4R Maintenance - Resurfacing~|~7AEBE0AD4ADC029C241A5268101FA8C7D70200A2 80006~|~1~|~6~|~06/S<2~|~Bridge Rehab7306040 SCI SR00522**C : 0.980 Rehab Urban 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~8A28D36724580733624BA9076FF0029D0251FEFF 80006~|~1~|~2~|~02/NHS~|~Begin @ US52 north and terminate at the Lawrence County line. It is proposed to resurface the existing highway with asphalt concrete. Location: 0.00 - 0.1880/20 split ~|~05 - 4R Maintenance - Resurfacing~|~D9D7348C78FEE073EE218DD67D548ACBAACA2BD6 80006~|~1~|~1~|~01/STR~|~Begin @ US52 north and terminate at the Lawrence County line. It is proposed to resurface the existing highway with asphalt concrete. Location: 0.18 - 0.61 & 2.59 - 8.2980/20 split7306067 SCI SR00522**C : 2.990 Pave Thru Rural~|~05 - 4R Maintenance - Resurfacing~|~E14DEE56D1821C2C42D3594FA0EE69456233280F 125772~|~1~|~1~|~01/STR~|~Plan split for PRE 127 19.3.8 bridge replacement~|~04 - Reconstruction - No Added Capacity~|~A07148D11AAEC533004D7CE1D16624F4AA920265 100467~|~1~|~1~|~01/S<2~|~Reconstruction of the roadway, including reducing from 4 to 3 lanes, curbing, sidewalks, tree lawns, street lighting and streetscape amenities. The project also consists of extending the Creekside Trail from the intersection of Springfield and Smithville to existing infrastructure, 600' SW of the current intersection.~|~04 - Reconstruction - No Added Capacity~|~6719541E8441E06777C8882AC9C1283BC5210B4F 92636~|~1~|~1~|~01/S<2~|~Resurface the existing roadway with asphalt concrete on LOG SR 540 SLM 2.03 to 2.68.~|~05 - 4R Maintenance - Resurfacing~|~5904F4D6D9718564FA7CEEA37898C728A9A859F5 92636~|~1~|~2~|~02/STR~|~Resurface the existing roadway with asphalt concrete. LOG SR 540 2.68 to 8.72~|~05 - 4R Maintenance - Resurfacing~|~81C1887DA5DAB428039CF71AA100636185E7E2CA 116719~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~88F57E500B718855749F40475744C4B23FA1C622 102364~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. MEG 248 0.00-9.15. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~DA431272E38AC55DA12A083567828AAC87F0A6ED 102364~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. MEG 7 14.58-18.64. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~CC266970C73DB4F0C1AB880F7FC47C14C9756405 105711~|~1~|~1~|~01/NHS~|~Work on the NHS. All work on US 23, US 24, US 30 and SR 15. Funding is 80% federal and 20% state funds from the District Preservation Program. SACs 4PF7 and 4PS7.~|~21 - Safety~|~6D30DD8B6BE2E528897274AE4A36D26615E20882 105711~|~1~|~2~|~02/IMS~|~All work on Interstate 75. Funding is 90% federal and 10% state funds. District Preservation Program funds. SACs 4PF7 and 4PS7.~|~21 - Safety~|~4D9A3E1C23BD9DE2CE4AF31A8DDA210B32D1DC41 105039~|~1~|~1~|~01/SAF~|~Pavement marking project foy FY2023 Funded 100% state.~|~21 - Safety~|~712E0FC2D1ED166F44166441A1B4608FC1EFFF7A 94577~|~1~|~1~|~01/BRO~|~Split for bridge rehab~|~13 - Bridge Rehabilitation~|~D1CD70CE16874F73088A8360064892E51C1352A7 101393~|~1~|~1~|~01/S>2~|~BUT SR 747 - Mill and fill with 15% full depth repairs HAM SR 126 - Mill and fill surface (1.5" over 50%)~|~05 - 4R Maintenance - Resurfacing~|~305A534AB838C6AF5BE744C3D31460BBAE801A75 99495~|~1~|~1~|~01/S<2~|~LAW US 52 (12.32-12.66) Rock Barrier/ Rock Removal.~|~21 - Safety~|~2D21D27EB69067F90136B9BB2EAA17C9F0B59DD7 117166~|~1~|~1~|~01/MPO~|~Plan split for intersection pedestrian crossing improvements eligible work.~|~~|~4C3E534A22DFF14698937283E3E11FA41C791137 106222~|~1~|~1~|~01/S>2~|~Widening as well as 2 way turn lane, sidepath and sidewalk additions as well as improvements to include curb, gutter and storm sewer on Grange Hall Road in the City of Beavercreek.~|~21 - Safety~|~A9DB925C70EBEE9A7CF85210D0A039AFFB4679C4 116613~|~1~|~1~|~01/NFP~|~Construction Inspection~|~17 - Construction Engineering~|~7F1BB83D91A43B567E9072C33937132A0F931919 88759~|~1~|~1~|~01/STR~|~Replace deteriorating wearing surface with MSC with no (minimal) approach work on AUG SR 364 1546 SFN 0603643 (SR 29)~|~13 - Bridge Rehabilitation~|~71F3B9BFC38278C3BBF1CC3BEBC23C19D7222221 100973~|~1~|~1~|~01/STR~|~DSR# BEL-004~|~04 - Reconstruction - No Added Capacity~|~35727B70E6853885A6E8A0723457EB068E1E38DB 123984~|~1~|~1~|~01/STR~|~A 250 foot slope stabilization on MRG 78 4.16.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~070374ECA079607AB668A4B61CCB14B42D21BEC8 117441~|~1~|~1~|~01/SAF~|~Pedestrian Improvements on Innis Road ~|~21 - Safety~|~D7E46E24F45CD3E5AE4594D268D47624C0CA6402 101314~|~1~|~1~|~01/STR~|~Minor rehab on PIC-22-14.36 to 15.74.~|~05 - 4R Maintenance - Resurfacing~|~39F218957871FD137895341BFB7AA7FF27347C75 101314~|~1~|~2~|~02/NHS~|~Minor rehab on PIC-22-15.74-16.71 and PIC-23-12.92-23.16.~|~05 - 4R Maintenance - Resurfacing~|~4A0B2E5DFC02D8128656E47628D5CB874910976D 101902~|~1~|~1~|~01/NFA~|~Mill & Fill Baumhart Road (CR 51) from SR 113 to Ohio Turnpike.~|~05 - 4R Maintenance - Resurfacing~|~E5B60DF531574B4643C3682C8130E369D9E4538B 101902~|~1~|~2~|~02/NFA~|~Mill & fill Oberlin Road (TR 39) from SR 113 to Ohio Turnpike.~|~05 - 4R Maintenance - Resurfacing~|~5A0EA4B664F104A8BD8991913618F3EBF1F5E992 101902~|~1~|~3~|~03/NFA~|~Pavement repair and guardrail improvements on TR 54 (Murray Ridge) under Ohio Turnpike.~|~05 - 4R Maintenance - Resurfacing~|~63942FEE42E598574CD4F92E46A7F5EAB41D60F9 101902~|~1~|~4~|~04/S<2~|~For locally funded items~|~05 - 4R Maintenance - Resurfacing~|~C25DCBF5CF458A0CCD5316C77364954078DFDC79 95555~|~1~|~2~|~02/NFP~|~Split for items of work not eligible for federal funding including utility work to be funded at 100% local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~09668A95AE7C8175A62BE43E65E567A56D525868 95555~|~1~|~1~|~01/MPO~|~80/20 federal/local funding split using MPO STP (SAC 4TA7) funds to rehabilitate Woodland Avenue.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DD6349E505153FFCC4C49B74F5DC1457B78EAB11 120936~|~1~|~1~|~01/BRO~|~Replace bridge carrying US 250 over abandoned railroad bed.~|~04 - Reconstruction - No Added Capacity~|~50D8B5F6261F2FC94CDF4087862DA378DCE0CF11 88973~|~1~|~1~|~01/NHS~|~Bridge Work: CRA-30-8.42 (L&R) / CRA-30-8.62 (L&R) / CRA-30-8.96 (L&R) / CRA-30-11.23 (L&R)~|~13 - Bridge Rehabilitation~|~3DBBC18C23029929AB5FB5C1D263521BD7FE44F4 88973~|~1~|~2~|~02/NHS~|~Reactive Bridge Approach Paving~|~05 - 4R Maintenance - Resurfacing~|~64CB720490DCA88ACB4EA6E23643B95D572FC96C 101772~|~1~|~1~|~01/NFP~|~Rehabilitate and resurface various roads and parking lots within Lake Isabella and Sharon Woods Park. Work consists of pavement planing, repairs, application of asphalt concrete surface course, new parking blocks, replacement of guardrail, and application of pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~56C50566A99085F8AD6E5E026073CC0FACAD1FFC 112334~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2022. NHS route funded 80% Federal/20% State.~|~21 - Safety~|~E38083877087C74BB0DEBD14DC058F4B66C975A4 118570~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on ATH 681 0.00-7.24, HOC 278 0.00-0.26 and VIN 278 0.00-12.99. Rural other federal aid funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~CFD37ADE42C224D9FA15663569FA7FEECAF04D6E 118570~|~1~|~2~|~02/STR~|~VIN-278-0.64 & 8.69.~|~66 - Resilience Improvement - Highway Project ~|~F5486666FED92C7B44DC6777734D703B8CBFA355 97942~|~1~|~1~|~01/IMS~|~50% OOhio and 50% Kentucky Share.~|~47 - Bridge Preventive Maintenance~|~7246359AEA96BCFF557CDF66C2F0788B7D767584 126057~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~DFCF6C8210BC6F7DCD17DE1B1FAC40A1ADAC6DB0 126057~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~566031C2EA6DAF0BAB31661B0E89B7CD94BDEE38 115516~|~1~|~1~|~01/NFP~|~Bridge replacement. ~|~10 - Bridge Replacement~|~31C57ACB13BAB2B8ECEF2E704BA08F7D27C055E3 115516~|~1~|~2~|~02/NFP~|~All enhanced aesthetic items being paid for by the county. ~|~10 - Bridge Replacement~|~5C45B6D66BD179F996E225DFF5F3E235303D5184 114837~|~1~|~3~|~03/NFA~|~A.W. Marion Fog Seal and Sealcoating of Park Roads and Parking Lots.~|~05 - 4R Maintenance - Resurfacing~|~2F770B5D3902ECCBF1002068EA99DAD4A6A755D7 114837~|~1~|~2~|~02/S5K~|~Work inside the Circleville Urban Area (PIC-188 from SLM 2.56 to 2.878).~|~05 - 4R Maintenance - Resurfacing~|~C58CD8D84C3B1F0DCED7C3DE0EF90D6F10B98A49 114837~|~1~|~1~|~01/STR~|~Rural Plan Split (PIC-188 FROM SLM 2.878 TO 8.008)~|~05 - 4R Maintenance - Resurfacing~|~3880849A21899AB0DB52196FC036DA0FE880CFA2 110681~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~274106BA22D19442F8EC269F120E23E132CF407C 110681~|~1~|~2~|~02/S>2/YOUN~|~Resurfacing, urban paving in the city of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~D2EA7A819ECE090BC8AA621A56F70144ECE29F42 110681~|~1~|~3~|~03/S>2/YOUN~|~100% city items including full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~20C5C43C4F639605C599B3C4B3E19A5CC200FF90 86981~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. HOC 595 3.03-7.08. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~080D0214DAB237C72AB8F1014F296910D2BE5FD2 86981~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. HOC 595 0.80-3.03. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~3E197DD5112957F7F97D7D1B7E80BC9FEB83B55F 117042~|~1~|~1~|~01/NHS~|~Major rehabilitation of pavement on BEL-7~|~04 - Reconstruction - No Added Capacity~|~CEB77516C66C5A4B55C969C2BEED8712142D5142 117042~|~1~|~3~|~03/NHS~|~Plan split for replacement of BEL-7-1449 SFN 0700320 carrying SR 7 over Pinch Run. Plan split being funding with District Allocation (50%) and Major Rehabilitation funds (50%)~|~04 - Reconstruction - No Added Capacity~|~77C6C149D39DCEA235A841471B25D6CE483684D4 117042~|~1~|~2~|~02/NHS~|~Bridge maintenance work throughout the project, excluding Pinch Run~|~04 - Reconstruction - No Added Capacity~|~EC092A0DA6EC233CBA5360E67B038B03A5D82C0E 118367~|~1~|~1~|~01/SAF~|~Sidewalk on Gender Road~|~21 - Safety~|~9BB5394A36E1D0F286A19ABD13B622F97BF64D0B 118367~|~1~|~2~|~02/ENH~|~100% Canal Winchester Items~|~44 - Other~|~D146D89528E02A89D3C57D1158E275A7404BC1E1 126667~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~4130CDF030159FD51F62F7032BE975E77112C7CF 90635~|~1~|~1~|~01/NFP~|~This is a mowing contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A3DAA03AAB426B4BC918FA5C9912282F0925BE03 97267~|~1~|~1~|~01/BRF~|~Pile encasement and deck edge repair. GAL 775 0.43, SFN 2704358. Off system BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~1B5A96C215DE8C7EB0AFA245EE320B637A7E9719 97267~|~1~|~2~|~02/BRO~|~Pile encasement and deck edge repair. GAL 218 11.51, SFN 2702797. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~2FB82A0E332E66CD838016530825249491031DFB 104644~|~1~|~1~|~01/MPO~|~Resurfacing East Liberty St from US 422 to Girard East Corp Limit in the City of Girard, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~E2FDE449E91DC530666EDC5E2CBC740324A16405 99662~|~1~|~1~|~01/NHS~|~Storm sewer~|~05 - 4R Maintenance - Resurfacing~|~23CE8D79DBBD83F67767B307F277434AB90AC4B1 99662~|~1~|~2~|~02/NHS~|~Resurfacing of SR-184.~|~05 - 4R Maintenance - Resurfacing~|~DE91C72C551BB01A1C127C3CEBA697D7D2C36A12 99662~|~2~|~4~|~04/NHS~|~100% funded - City of Sylvania Storm Sewer~|~05 - 4R Maintenance - Resurfacing~|~965A8CD1A0870B810D2C5200F8A639774F57F80D 99662~|~2~|~3~|~03/NHS~|~ODOT maintained portion of Storm Sewer in Part 2 of the plans~|~05 - 4R Maintenance - Resurfacing~|~AA056A406E8058D52CE0170F008FDE1F82D7B338 99662~|~3~|~5~|~05/S>2~|~This split is for the sewer pipe at Talmadge~|~05 - 4R Maintenance - Resurfacing~|~B901BE9604075577BE78F291380355D60B188A97 107910~|~1~|~1~|~01/S>2~|~Urban portions of DEL-315, DEL-42 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~AE19778451EFDE1517709BF86F482B505F05E73C 107910~|~1~|~2~|~02/STR~|~Rural portions of DEL-42 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~C8ACC2189BE717D88FEA78E4506C2CF3CF9E6EBC 107910~|~1~|~3~|~03/NHS~|~FRA-40 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~92E0B665FE8FBED02E9B26B1DB0EE170894667D8 124557~|~1~|~1~|~01/S>2/NORT~|~Resurfacing.~|~~|~A4B6416D31CB7B01C290F20D0FB50FC667E41062 108592~|~1~|~1~|~01/NFA~|~The VILLAGE will reconstruct .45 miles of Commercial Ave, south of the Cross Creek Bridge to north of Wabash Ave~|~17 - Construction Engineering~|~7DA011C3FB2FE3D3EFE160F81A26B0810EC435CE 108592~|~1~|~2~|~02/NFP~|~The VILLAGE will reconstruct .45 miles of Commercial Ave, south of the Cross Creek Bridge to north of Wabash Ave~|~~|~B53EB2EC1284AD05FFD78FC82B5C488B5F0566FE 101901~|~1~|~1~|~01/IMS~|~Full depth bridge deck patching.~|~13 - Bridge Rehabilitation~|~C441993499F00C7E0D985D7AA33C34A1548ABB37 93176~|~1~|~1~|~01/S>2~|~Replace deteriorated concrete slab bridge with a new bridge deck and substructure with minimal approach work on SFN 5710448 MOT 741 0552 Tributary over Great Miami River.~|~10 - Bridge Replacement~|~D78CFAF6827DE016D200C575A4FA50BB8420ED6F 96685~|~1~|~1~|~01/NHS~|~Plan Split for the items paid at 80% by ODOT and 20% by the City. This does not include any curbs, curb ramps, pavement repair, or non-roadway item.~|~05 - 4R Maintenance - Resurfacing~|~710C2D8E979B4D8D38E3104581807DA9E1A1B6C0 96685~|~1~|~2~|~02/NHS~|~Plan Split for all items paid at 100% City cost. This should include pavement repair and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~A26C90D93979F0D364F27819A80DA7883F3046DE 96685~|~1~|~3~|~03/S<2~|~Resurfacing on Kemper Road at 100% City responsibility~|~05 - 4R Maintenance - Resurfacing~|~9309FFE15A0797543FE536278ADEECBDC1122262 123706~|~1~|~1~|~01/STR~|~All work is within this split~|~21 - Safety~|~54038460A2AC6C3E5A53282D64DA54C5ED8933B7 89136~|~1~|~1~|~01/BRF~|~6631169 PIK CR47 3.04 Intersect: Stream CEAO 80 Fed/20 local match Pike County 01/BRF/BR/PIKE~|~10 - Bridge Replacement~|~5B9C6C7FAC9FD6A300766C300E3683BECD47A93E 98032~|~1~|~1~|~01/NFP~|~District 10 two-year mowing project for CY 2016-17 along Interstates and Interstate look-a-likes (4 lane) district wide. Funded 100% state.~|~44 - Other~|~A9EC2E8218350B9E27D844EEDC5AAA714A4B9398 115667~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~~|~853B19B3525E58E04EA68278345503255B476674 126447~|~1~|~1~|~01/NHS~|~Plan split for collision damage repair of HEN-24-1383R bridge~|~13 - Bridge Rehabilitation~|~C5F2037507CE0BE1690ED1E98EBA05BF7250CABB 114141~|~1~|~1~|~01/SAF~|~ITS maintenance on power services, fiber optics and other misc. related work~|~44 - Other~|~290A64D26E678431A9D873C9CAF9EC12D1764588 110136~|~1~|~1~|~01/STR~|~Microsurfacing on LOR-58-0.00 to 4.43Double Microsurfacing on MED-303-2.83 to 4.951~|~05 - 4R Maintenance - Resurfacing~|~B8EA8AF4BEB9BBEEF7E4CC8805DC023EB04FECBD 110136~|~1~|~2~|~02/S>2~|~Double Microsurfacing on MED-303-4.951 to 5.998~|~05 - 4R Maintenance - Resurfacing~|~0DCF29ECACD56D57F5BDB79A5AB49144570915F6 82557~|~1~|~1~|~01/S>2~|~Improvements of approximately 1.06 miles of existing Old SR-74 providing safety and capacity upgrades. Project will include the construction of two 12-foot wide thru lanes, 4' paved shoulders, center turn lanes, curb and gutter storm drainage, street lighting, and sidewalks to accommodate future pedestrian access to adjacent residential development. Right of way width is expected to be 80 feet. Improvements are necessary as part of local network improvements associated with both the I-275/SR32 Interchange and the proposed Elick Lane/Bach-Buxton Road interchange projects.~|~04 - Reconstruction - No Added Capacity~|~759CA120F507FFD20A4DD6BBC88D0D73C3502774 88906~|~1~|~1~|~01/BRO~|~Replace the existing MSC overlay with new MSC ovelay on bridge (COL-164-2394, SFN 1505130). Repair substructure units (abutments and backwalls).~|~13 - Bridge Rehabilitation~|~A305321514ACCC10E284FD6592ED6B9C904FA6A9 120694~|~1~|~1~|~01/STR/MCEO~|~Muskingum County CEAO Federal/State Exchange Programs Funding - 4C87 (95% State) / LNTP (5% Local Match) - Rehabilitation of MUS-CR 44-01.69 (SFN 6032133).~|~13 - Bridge Rehabilitation~|~A88D632AB22470A217F72AD5299E987CE8D0FA10 107686~|~1~|~1~|~01/STR~|~Resurfacing on SR 696 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~A1D418DBD25F96731A08740BF4D74551E28A1D45 120958~|~1~|~1~|~01/SAF~|~Construct roundabout at the intersection of MAD SR 665 and MAD CR 71 (Spring Valley Rd.)~|~21 - Safety~|~A5574C2FB35B103F5174C9932187141A61B00E00 126738~|~1~|~1~|~01/ENH/WARR~|~Sidewalk repairs.~|~28 - Facilities for Pedestrians & Bicycles~|~4A132F10442FF15BAAA634F37B10B25D53FEE5E8 121224~|~1~|~1~|~01/NHS~|~NHS culvert has been linked.~|~04 - Reconstruction - No Added Capacity~|~31CFD573B7FE72FE789DC97B2230C4E08A9BA554 121224~|~2~|~2~|~02/STR~|~culverts linked to STP Rural~|~17 - Construction Engineering~|~7F3A721C2C1525CEE42A81DF65758DAE115D1E34 121224~|~1~|~3~|~03/STR~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~556E544A5426B298D91C51CDC0F5C2973F023875 121224~|~1~|~4~|~04/S>2~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~C6CE599256E056BD5501969F3F052925D0762D61 112657~|~1~|~1~|~01/MPO~|~Resurfacing a portion of Trumbull Ave and West Liberty St.~|~05 - 4R Maintenance - Resurfacing~|~A33DD784F85E28A3EBBDEF63F30E02F04CF391E2 100673~|~1~|~1~|~01/NFA~|~Chip sealing HOL-179 from SR 39 to SR 226 and resurfacing with fine graded polymer overlay from SR 3 to the Wayne Co. Line.~|~05 - 4R Maintenance - Resurfacing~|~1770A94D367BC90A1FC5F9F9D25262298EC659E3 100673~|~1~|~2~|~02/STR~|~Resurfacing HOL-179 with fine graded polymer overlay from SR 226 to SR 3.~|~05 - 4R Maintenance - Resurfacing~|~A9E5F2502A787E7A7CEF04636941258714272202 123613~|~1~|~1~|~01/S5K~|~Funding Split for STP 5,000-49,999~|~05 - 4R Maintenance - Resurfacing~|~A20F4BF69345F6836396AF5AF97756CEDEBF907D 97449~|~1~|~1~|~01/BRF/PCEO~|~Perry County Engineer's Office Ohio Bridge Partnership Program Funding - 5BP7 (80% Federal) / TRC-4BG7 (20% Local) - See CAP Comments - Bridge replacement of SFN 6431941 on Per CR 64~|~10 - Bridge Replacement~|~A49316423BC90F844233D3785035F9C03D5E9ACD 101477~|~1~|~1~|~01/NFP~|~Resurfacing of Hudson-Aurora Road from Frost Road to City Corp Limits, within the City of Streetsboro. Includes full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~1DDF965C40E8F21875AE800F5577476DF7B475B9 117867~|~1~|~1~|~01/S5K~|~To provide highway lighting along the SR 170 business corridor in the community of Calcutta in Columbiana County (from SLM 0.13 to SLM 1.56).~|~21 - Safety~|~2C363784DE0E9194BAC3A1CB8B03B28558302555 116811~|~1~|~1~|~01/NHS~|~HOC 33 14.70-16.06 WB Major Rehabilitation using full depth pavement removal and replacement.~|~05 - 4R Maintenance - Resurfacing~|~E7DB95912C7751950C275C50DD258F36C56C4E01 116811~|~1~|~3~|~03/S5K~|~ATH 682 0.023-0.77 Major Rehabilitation using full depth pavement removal and replacement. 80 Federal/20 Local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E9CCBC32E7F77A096B2DAB7E4142B8677FADC15 116811~|~1~|~2~|~02/S5K~|~ATH 682 0.00-0.023 Major Rehabilitation using full depth pavement removal and replacement. 80 Federal/20 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4F9A3D9E1BC71E72ED76BCC53B225883A011DB71 116811~|~1~|~4~|~04/S5K~|~Bridge painting on ATH 682 0.284, SFN 0504750.~|~13 - Bridge Rehabilitation~|~CC71ADD1B673F0BC9DF8644F9DFF4E3005D5575B 116811~|~1~|~5~|~05/S5K~|~Concrete removal and storage on for ATH 682. Funded 100% State GSM.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~398880A2F0419BB38137418992AB46F02F2486BF 101070~|~1~|~1~|~01/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~E99609E9B4C5087B171165345815E16A18401B93 101070~|~1~|~2~|~02/S<2~|~This plan split is for the small urban route.~|~05 - 4R Maintenance - Resurfacing~|~DC7ABBA45B110E4379D3CD326DE13BC281CBF8D6 86698~|~1~|~2~|~02/S<2~|~Urban Smoothseal: MED 94 5.31-5.41, CRA 61 7.08-9.20, RIC 61 3.12-3.88~|~99 - State Preventative Maintenance~|~218B82F20418FA3FA721C7E7B2DA3F79A4A1F6B8 86698~|~1~|~3~|~03/NHS~|~NHS Smoothseal: HUR SR 18 15.32-29.19~|~99 - State Preventative Maintenance~|~BCE18986B803F7ED7D03960FCA9D5B92F9AB847C 86698~|~1~|~1~|~01/STR~|~Rural Smoothseal: MED 94 5.41-10.35, CRA 61 9.20-12.02, RIC 61 0.00-3.12~|~99 - State Preventative Maintenance~|~C4D29E520BC743870AA4E233C067343BC6CF6F71 100587~|~1~|~1~|~01/STR~|~LAW 522 (0.00-8.29)~|~05 - 4R Maintenance - Resurfacing~|~25EED5767E0BBE82653772DF09A5B65DAA7B45D1 100587~|~1~|~2~|~02/STR~|~Bridge preventative maintenance.LAW 522 2.16 (SFN 4403843)LAW 522 4.19 (SFN 4403878)~|~47 - Bridge Preventive Maintenance~|~06EF3AB4CD0796D36C41235F3E5A840306733716 125236~|~1~|~1~|~01/S50~|~Multi-Use Path Construction~|~28 - Facilities for Pedestrians & Bicycles~|~8642FBB6BD57B6222645DC4F462C932ECF4C619B 120413~|~1~|~1~|~01/NHS~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~4D07C336BC1EFC2702D4927C8B2A0285F54AFBB7 104170~|~1~|~1~|~01/ENH~|~Streetscape in Bolivar on Canal Street 95% Federal TAP funds and 5% Local LNTP funds.~|~28 - Facilities for Pedestrians & Bicycles~|~BB1210952F155EEBC74102F33BACB342F6274541 104170~|~1~|~2~|~02/ENH/BOL~|~Streetscape in Bolivar on Canal Street; Combination of Federal ARC, State ARC, OPWC and LNTP funds.~|~28 - Facilities for Pedestrians & Bicycles~|~42EC7C80D963D1F33430EA82148E2E66F4BDA04A 126567~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay on GAL US 35 13.78 L (SFN 2701103).~|~13 - Bridge Rehabilitation~|~BD2BC12ED08B4DF551B7F129E009DEBF2B10ED9D 88881~|~1~|~1~|~01/STR~|~Resurfacing SR193 2.47-7.45~|~05 - 4R Maintenance - Resurfacing~|~D193E4E57D93F70A79EDCCF08B873DFF21C3154A 88881~|~1~|~2~|~02/STR~|~NOT BR ELIGIBLE: Structures 10' to 20' span.SFN 0405167 SR193 4.85 over Pymatuning CreekSFN 0405205 SR193 5.66 over Pymatuning CreekSFN 0405264 SR193 6.72 over Pymatuning Creek~|~10 - Bridge Replacement~|~36F5B64083D93AB2DABB5508940F48601ACE4920 113094~|~1~|~1~|~01/STR~|~bridge plan split~|~10 - Bridge Replacement~|~3EBEAD7D904FF4C9202C82DA3FF12FAA310FBBD2 79665~|~1~|~1~|~01/NHS~|~Priority system paving of FAY-35: 11.95-17.41~|~05 - 4R Maintenance - Resurfacing~|~073F0538A7DF93E46821A3187633AD6FDC24507D 79665~|~1~|~2~|~02/NHS~|~Minor bridge work on 10 structures (not BR eligible):2400405 FAY US35 13.56 Intersect: Over Csx Rr (Old B&O)2400413 FAY US35 13.56 Intersect: Over Csx Rr (Old B&O)2400499 FAY US22 13.76 Intersect: Over Usr 222400502 FAY US22 13.76 Intersect: Over Usr 222400553 FAY US35 16.66 Intersect: Over Paint Creek & Cr 582400561 FAY US35 16.66 Intersect: Over Paint Creek & Cr 582400596 FAY US35 16.8 Intersect: Over Dt&I Rr (Aband.)2400618 FAY US35 16.8 Intersect: Over Dt&I Rr (Aband.)2400642 FAY SR753 17.21 Intersect: Over Sr-7532400650 FAY SR753 17.21 Intersect: Over Sr-753~|~05 - 4R Maintenance - Resurfacing~|~6D9455BF15CA886A279963ECA1CB3D102916D114 106536~|~1~|~1~|~01/NFP~|~Replace two culverts within Delaware Wildlife Area~|~~|~43651EB995C7FE1FC912BFF6D51453A01B060853 123815~|~1~|~1~|~01/BRO~|~Plan split for all work associated with OTT-51-0852 bridge~|~13 - Bridge Rehabilitation~|~8588FECA831F4C95F8520DFFEFEA971546E35A5A 97953~|~1~|~1~|~01/ERD~|~Resurfacing of CR 158 (King Graves) from State Route 11 to State Route 193 in Vienna Township, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~A2CE221C180E08C5E7F69BE03B4179A131DB51D8 111613~|~1~|~1~|~01/S>2~|~City of Columbus Urban Paving Plan Split: FRA-62-17.66-18.99~|~05 - 4R Maintenance - Resurfacing~|~17F77EFB10AA67E2ADE9158352477DCB1EC11661 25343~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 33 0678 LT (SFN 0500577) and RT (SFN 0500607), ATH 33 1569 LT (SFN 0506028) and RT (SFN 0506044), ATH 33 1580 (SFN 0506125) and ATH 50 1423 (SFN 0501549). NHS route funded 80 federal/20 state.~|~44 - Other~|~11656C3A8EE17B9884FBF3922C778332FF519F3B 119198~|~1~|~1~|~01/STR~|~Rural resurfacing plan split: MAR-95-0.45-4.48~|~05 - 4R Maintenance - Resurfacing~|~50229211AF0EE8BFEB055CCE786AB31E60174E6B 118586~|~1~|~1~|~01/MPO/OXF~|~Construction of a platform and shelters to facilitate Amtrak passenger service to the City of Oxford. Construction of a parking lot and sidewalk connection to an adjacent transit center.~|~44 - Other~|~2FF88BCD702E7245C5AA341C43BF9ED93319EE63 87100~|~1~|~1~|~01/STR~|~District Wide project for pavement preventative maintenance on the General System. This plan split is for all work on PRE-127 from SLM 0 - 5.03.~|~99 - State Preventative Maintenance~|~1CCA4C881C7B3F344D4727AFBBF8DA18BC64D3B4 127126~|~1~|~1~|~01/BRO~|~Plan Split for rehabilitation work~|~13 - Bridge Rehabilitation~|~3C64D0BD86B75A6F4B16424266D73A62D259FCB2 113515~|~1~|~1~|~01/NFP~|~The improvements Eastpointe shall include removal of the existing 1,000 LF of asphalt pavement at the entrance, regrade and pack existing 304 stone base, then replace with 8? of ODOT QC MS concrete pavement. Then mill an additional 1,575? of existing pavement, 2? deep and haul off site.~|~44 - Other~|~29C8A9AA59BE2527D5E5F336616593CFE81327FB 116805~|~1~|~1~|~01/NHS/MUNF~|~Resurfacing, urban paving in Munroe Falls.~|~05 - 4R Maintenance - Resurfacing~|~2FD4EC6A911565A76ECEEFF851B9C666E055B6E9 116805~|~1~|~5~|~05/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~CCE414166E6BAA3CB22A82557084A82D4508A60F 116805~|~1~|~6~|~06/NHS~|~Bridge preventative maintenance~|~47 - Bridge Preventive Maintenance~|~88E4546ADDE5C28E491D3B0052280FAE3549D2DC 116805~|~1~|~2~|~02/NHS/MUNF~|~Full and partial depth pavement repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~6ED8B6B1288897E738D8C880BA12D583DE86C62B 116805~|~1~|~4~|~04/NHS/HUDS~|~Full and partial depth pavement repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~43020583FD53E92A69375B9DA8FCBB4FC4345F6A 116805~|~1~|~3~|~03/NHS/HUDS~|~Resurfacing, urban paving in the City of Hudson.~|~05 - 4R Maintenance - Resurfacing~|~E4AEB681EF394A881262C7BC016F306213EA2675 113908~|~1~|~1~|~01/STR~|~Landslide repair project GAL 588 11.10-11.12. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A09DE8E4593B60F168C21018847173DFD3FB09D8 90705~|~1~|~1~|~01/MPO~|~LUC CR125 1.24-1.26 - LUC SR64 0.18-0.2improve the intersection of State Route 64 and River Rd in the City of Waterville~|~21 - Safety~|~3336C498193525EA8ED28D9241163FFA80CE09D8 100308~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay to STA SR 800 from 0.00 to 3.62.~|~05 - 4R Maintenance - Resurfacing~|~144B3CE79480B101E2796DEBB5AF3FBB02ED1332 100308~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to STA SR 800 from 3.62 to 7.04.~|~05 - 4R Maintenance - Resurfacing~|~051EC45C454578FACD91B1F888486240E155E64C 108138~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8~|~21 - Safety~|~02FA5EAA82FCC24267FA5B0C7C5B9FF016E306B4 108138~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7.~|~21 - Safety~|~43D5C104BFCE9EB979F7961BC8A9114F0B745DE5 110530~|~1~|~1~|~01/IMS~|~Bridge Plans split~|~~|~46F308DC7D4EC75894B85D5251BCE09D6982DC05 116117~|~1~|~1~|~01/NHS~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~5FC7BDC0073E1D67ED37FFCA2CB7D4D15B81D332 96832~|~1~|~2~|~02/S>2~|~100% local items not eligible for normal project funding.~|~03 - Reconstruction - Added Capacity~|~CBAE7E17F1E6263989902FF4E0E324EB74214728 96832~|~1~|~1~|~01/S>2~|~Funding for all work~|~03 - Reconstruction - Added Capacity~|~E7CE8833CF4A040F509204332467A44A6D7A62A1 95404~|~1~|~1~|~01/CMQ~|~East Cleveland city wide signal upgrade and coordination mainly along Euclid Avenue using MPO CMAQ funds @ 80% federal and 20% local match.~|~21 - Safety~|~DC8B5994EAF45B21D388CDBEAD32A518527F688D 76391~|~1~|~1~|~01/IMS~|~Plan Split for Pavement for SUM IR 77 from 4.05 to 7.44~|~05 - 4R Maintenance - Resurfacing~|~4F25787AA48BE873C5E88504623BC7E2CD0E9F28 76391~|~1~|~2~|~02/IMS~|~Plan Split for Bridges SFN 7702299, SFN 7702329 SUM 77 04.51 L&R over SR 241, SFN 7702345, SFN 7702434 SUM 77 06.72 L&R over Arlington Rd, SFN 7702469 SUM 77 07.44 under Killian Road, SFN 7711131 SUM 619 09.26 over I - 77.~|~13 - Bridge Rehabilitation~|~91D60014C158D2AB5A8889B025B786A10511D1F6 109402~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers.~|~21 - Safety~|~2C1AEB16BEC1B83A4D5EF08BB99FF48442077FFB 105635~|~1~|~1~|~01/IMS~|~Mowing Contract~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~36B22E555C29AE44DCC87587162EE58C9557D0D2 113434~|~1~|~1~|~01/SAF~|~Improvements at two roundabouts on Main St~|~~|~8954F707BEB9B93FF7181A5EBFB21F7DA1E0B087 101427~|~1~|~1~|~01/IMS~|~Reface Mt. Adams wall~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~69876C22648948A3E6ED398155617515E15FD4B6 103299~|~1~|~1~|~01/NFP~|~Split for lighting work~|~44 - Other~|~520DF418BA2D608B44D725D0D2AE67C4D90C3CE4 114517~|~1~|~1~|~01/S<2~|~Overlay on HIG 41.~|~05 - 4R Maintenance - Resurfacing~|~279B35F7AED48439DBDF1F0856928D2C693CE9AA 101374~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 266 11.47 (SFN 5801265) and NOB 821 0.68 (SFN 6105254). Federal STP 80% and 20% State.~|~10 - Bridge Replacement~|~F0E40F30C38DF3CFCD754F228C56C8BAD16D65C7 117937~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~138C30912BB79AAA76677660B3FF09A4F203F948 103709~|~1~|~1~|~01/IMS~|~Pavement Split~|~03 - Reconstruction - Added Capacity~|~8A7529DE57FDE5A86557EDED61D86F618CE75CA6 118884~|~1~|~1~|~01/MPO~|~Full signal upgrade, turn radius improvements, installation of sidewalks, crosswalks and curb ramps at the intersections of Shawnee Road and Dixie Hwy. with Breese Road. Addition of a westbound right turn lane at Breese Road and Shawnee Road. All work included in this split.~|~21 - Safety~|~97A40BE2E3C7BB88DCF30CEC65A83B2AE2705734 114044~|~1~|~1~|~01/SAE~|~Installation of new traffic signal at Olde Eight/Twinsburg Rd intersection.~|~21 - Safety~|~8F16A2082519A640FF515066A960E675E2683692 98541~|~1~|~1~|~01/SAE~|~Systematic sign upgrades in villages and other missed areas that need upgrading in Warren County.~|~21 - Safety~|~66690723A370A9BEFA0479A4A463614B8B244FA0 126272~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~10F38D836BF2B3D7AC17FA7DEE123F9E1B9F60A7 93153~|~1~|~1~|~01/BRF~|~Bridge replacement project. GAL TR 766 0.05 (SFN 2743566). Federal 80% and 20% Local.~|~10 - Bridge Replacement~|~0E4CAA28B3B47612C95C633003B31D648AAB4F7F 110053~|~1~|~1~|~01/STR~|~Slide repair PIK 335 16.05~|~~|~C49E2D826207FECACDEA8E7C602057F0C40BEA4C 98491~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~37CEFF98D577EB8FB75DDA7EC5EB7089DD311AC6 98491~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~2F256572C29887D5CACF28697DD1A256EF2BBFCB 98491~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~AE42E213CE1B4B650C672C124156E9D6E904E213 98491~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~4581CE0CC0A8CBF56815CE33A77F730384808EEB 112151~|~1~|~1~|~01/NFP~|~District-wide construction engineering services.~|~17 - Construction Engineering~|~3D48D028C47C8E66EC46371B9E658125FEEF15FA 114587~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 681 4.95. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8A586B154353425A4B83066C027D68DFCF393E32 114587~|~1~|~2~|~02/STR~|~Landslide repair project. MEG 681 5.51. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3F21646CCBA65F70D823157C311B2B75A0D42F19 83058~|~1~|~1~|~01/STR~|~JAC SR776 0.00 ResurfacingThis includes PIK SR776 beginning at the Scioto County line (0.00) thru Pike County and terminating at the Jackson County Line (0.99). Then beginning at the Pike County heading north east to the corporation limit of the City of Jackson.These brdgs are pave thru.4003942 JAC SR776 0.65 Intersect: Trib Of Little Scioto4004019 JAC SR776 1.65 Intersect: Trib Of Mcdowell Run4004094 JAC SR776 3.91 Intersect: Trib Of Brushy Fork4004124 JAC SR776 4.12 Intersect: Trib Of Brushy Creek4004159 JAC SR776 4.4 Intersect: Trib Of Brushy Fork4004175 JAC SR776 6.18 Intersect: Trib Of Brushy Creek4004205 JAC SR776 7.86 Intersect: Buckeye Creek4004264 JAC SR776 10.87 Intersect: Trib Of Salt Lick CreekCO CC 01 Rural plan split added.80/20 split~|~05 - 4R Maintenance - Resurfacing~|~291FBF021A99F6D476EEAE4163160C1B0B6B853C 83058~|~1~|~3~|~03/S<2~|~JAC SR776 0.00 ResurfacingBegin project at the Pike County heading north east to the corporation limit of the City of Jackson.80/20 splitCO CC 02 Urban plan split added.~|~05 - 4R Maintenance - Resurfacing~|~4310546817D3B2C4A36F2D5C8383D79F7E94675E 83058~|~1~|~2~|~02/STR~|~JAC SR776 0.00 ResurfacingBegin project at the Pike County heading north east to the corporation limit of the City of Jackson.CO CC 01 Brdgs added for SFN's 4404051 ($53,875) & 4403993 ($95,875) for total of $149,664.00Brdg Rehab4003993 JAC SR776 1.5 Intersect: Mcdowell Creek4004051 JAC SR776 2.03 Intersect: Little Scioto River6603335 SR776 0.050 80/20 split~|~13 - Bridge Rehabilitation~|~ED5B3217279C43A1EDFCD225A906C823AB3012CE 95882~|~1~|~1~|~01/STR~|~It is proposed to perform microsurfacing on SR138 beginning at SLM 0.00 (SR134) and terminate at SLM 7.03 (SR131). 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~6F46F9897305202073F63A2A7783887E71BA6238 109784~|~1~|~1~|~01/NHS~|~AC overlay without repairs~|~17 - Construction Engineering~|~E4731FA4E71FDDBB6F72F54486C72B3FDD37ED0C 109784~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~17 - Construction Engineering~|~8741D4CC5896CB596266629E445B2F24D7A1574A 112922~|~1~|~2~|~02/S<2~|~JAC 788 0.49-2.39~|~05 - 4R Maintenance - Resurfacing~|~4C689E7484BBB7097117E0E3970C3F7C33E25568 112922~|~1~|~1~|~01/S<2~|~JAC 788 0.02-0.49 Local Match~|~05 - 4R Maintenance - Resurfacing~|~E24B5907F54118C0F744366BF29319CC5AEA0ADE 112922~|~1~|~3~|~03/S<2~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~4F99936538E58B7DC45D10B4CAD52459CDE1D81C 112922~|~1~|~4~|~04/NFP~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~409E48C05B758F4CAF07295C848021AC41FB78A0 115202~|~1~|~1~|~01/CMQ~|~Widen the roadway from two to three lanes, install street lights and construct a 10' tree lined multi-use path.~|~21 - Safety~|~C9975077CA20E841BFFFDB349C3C1727D1F9307C 96092~|~1~|~1~|~01/BRO~|~District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3000184 GUE US22 4.69 Intersect: Us 22 Over Jackson Run; BR Eligible for Rehabilitation: Length=28 SD/FO(1) SR=58.9 DSR=4~|~13 - Bridge Rehabilitation~|~BC20F4C3FD77BAE215B97CD589E30BFBB5A5F07D 109656~|~1~|~1~|~01/S<2~|~Resurfacing COL-62 from SLM 0.00 to 1.13, SLM 2.61 to 3.87, and SLM 4.40 to 4.86~|~05 - 4R Maintenance - Resurfacing~|~66CE33AEB2860AE1C55037D09D708DDA5DE2D2CA 109656~|~1~|~2~|~02/STR~|~Resurfacing COL-62 from SLM 1.13 to 2.61, and SLM 3.87 to 4.40~|~05 - 4R Maintenance - Resurfacing~|~DB562C8BC93F18618506F29881795FCCB1888C8E 110771~|~1~|~1~|~01/STR~|~Landslide repair. VIN 93 6.67-6.69. Funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F346C2EBB1FABF5BF2FC4D4A9F3F4A2B3FA8DCE9 124604~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to install new pavement markings on various county roads.~|~17 - Construction Engineering~|~508055CA49B67D29E784ECF0C305059D71ACD8C2 100774~|~1~|~1~|~01/IMS~|~Plan split for interstate locations on this project, such as FRA-270-17.10-18.56.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DBD9D76F86358361DE00E50A40325B009B43FAA5 100774~|~1~|~2~|~02/NHS~|~Added NHS plan split for locations such as FRA-40-6.44-7.53~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EC0E538E6C0883EA6B2AAD34738F224BE0216CB8 123560~|~1~|~1~|~01/IMS~|~Replacing R-W/R striping installed in 2021~|~21 - Safety~|~EF371E3B4318BFCDDC2176B0B3687C0A39E948A5 98379~|~1~|~1~|~01/S<2/CONN~|~Resurfacing ATB SR 7 from 31.37 to 32.32 and ATB SR 531 from 21.21 to 22.72 urban paving in the City of Conneaut.~|~05 - 4R Maintenance - Resurfacing~|~98E259BFA47B4A49522C5B38348058D52FB287DE 98379~|~1~|~2~|~02/S<2~|~Minor work to linked structures >20' span.~|~13 - Bridge Rehabilitation~|~64C9F08CE08B72EAEE5B09328BE5B4AA63C37372 98379~|~1~|~3~|~03/S<2~|~Minor work to linked structure with a 10' to 20' span.~|~17 - Construction Engineering~|~07958BF6DF53394B3187761CC9A843A2D753D7C9 98379~|~1~|~4~|~04/S<2/CONN~|~100% City of Conneaut items, including partial and full depth repairs, curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~45C88418C5CF4E7607956B2CCE4CCB201D26FF75 97301~|~1~|~1~|~01/IMS~|~Plan split for signal work~|~44 - Other~|~5714596670950246C219251FE37DC811491B3D9C 115480~|~1~|~1~|~01/NFP~|~Plan split for non-PID related work~|~17 - Construction Engineering~|~8A87A3C624871F2B2F5E215A08142F263BD195FC 105543~|~1~|~1~|~01/STR~|~Rural plan split: DEL-257 DEL-605~|~05 - 4R Maintenance - Resurfacing~|~B909E3CD30FBCD762CBF419633AF933BE3052009 82552~|~1~|~1~|~01/MPO~|~Reconstruction of existing Clepper Lane from Gate Drive, east of Glen Este-Withamsville Road. Realignment and extension of existing Clepper Lane further east, to tie into Bach-Buxton Road. Improvements include a minimum of two 12' wide lanes with 4' wide paved shoulders, turn lanes for drive access and at side streets, installation of curb and gutter, roadway lighting, and sidewalk on the south side of the road.~|~01 - New Construction~|~A367B50EB27E69145A63773A31BF91C71EB0B9D9 77439~|~1~|~1~|~01/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~873AFCEAD67BA08CB9BEB0980151E9CD13AE4637 126678~|~1~|~1~|~01/STR~|~FAY 207 1.06 liner~|~13 - Bridge Rehabilitation~|~5005B51CE483FC02F65983351163CDB3F7B4D784 106132~|~1~|~1~|~01/NFA~|~Landslide repair, NOB 564 13.22. Not on any federal aid system funded 100% state.~|~17 - Construction Engineering~|~2ED53093C92F244BE308112B042E8EEF515EEE9B 109822~|~1~|~1~|~01/NHS~|~BRO 125 0.00-6.42~|~05 - 4R Maintenance - Resurfacing~|~CE56B68289D6A30F43D33A8BC30F2D8F40F12933 109822~|~1~|~2~|~02/STR~|~BRO 125 15.78-15.84~|~05 - 4R Maintenance - Resurfacing~|~287E3F508D16696351FB61D50F8AB64EC4571648 125821~|~1~|~1~|~01/IMS~|~Resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~699B9E435BF7C434D7BA85FCB0458E905ECB8EF2 88372~|~1~|~1~|~01/BRO/PCE~|~Bridge rehabilitation of sfn#6738206, POR-CR52-2.78 over the West Branch Reservoir, Portage County, Ohio. ~|~13 - Bridge Rehabilitation~|~7883DEF85782470EAD23FF33607C8B3A29E93436 89453~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/PV/CAMB" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Cambridge on Gue-SR 209-07.64 to 08.11~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3AEF0E21F4FDA397FDF91B18E0ECD3F1EC3FC40F 89453~|~1~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Gue-SR 209-07.07 to 07.64;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8BE9C40C425884F36CA26F06B9BC5C89CF543677 89453~|~1~|~5~|~05/S<2/CAMB~|~"05/S<2/OT/CAMB" - Local Match 4BG7 (100% Local) - No CAP for ADA Ramps in the City of Cambridge, Gue-209-07.64 to 8.11~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~90B8B392D440F35E4C33DAB1F55EC32EACE4AED4 89453~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on 1) Mus-SR 209-00.00 to 01.64; 2) Gue-SR 209-00.00 to 05.54;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~942EB6971DEB6EB8F587167DDDCFC972B7DB34EF 89453~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Gue-SR 209-05.54 to 07.07~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A0C660A83DFF23F534963AD6AB0E427530C25010 112684~|~1~|~1~|~01/S<2~|~Asphalt resurfacing of SR 43~|~05 - 4R Maintenance - Resurfacing~|~C9F2F62AF8A778541EDB4A990A2AD6D10977CFDE 112684~|~1~|~2~|~02/S<2~|~100% City items, including auxiliary pavement markings and curb ramps~|~05 - 4R Maintenance - Resurfacing~|~24869B2F342B136717CA4186964378603D793C6D 94005~|~1~|~1~|~01/IMS~|~90/10 federal/state funding split for all work.~|~05 - 4R Maintenance - Resurfacing~|~E0CFF4AAB2C403E9F9AF8AA478D436EBE5FB97AC 85350~|~1~|~1~|~01/ENH/NEWL~|~Village of New Lexington Transportation Alternatives Funding - 4B37 (Federal 80%) / TRC (4BG7 15%) / 4BG7 (Local 5%) - See CAP Comments - Enhancement of New Lexington downtown area by the installation of new sidewalks with decorative brick pavers, decorative lighting and various other enhancements.Construction Inspection will be performed through the District 5 Construction Office.~|~28 - Facilities for Pedestrians & Bicycles~|~63FA156687C9E6CD2235DF2A1078F3EFEBD790A7 116816~|~1~|~1~|~01/STR~|~Rural~|~05 - 4R Maintenance - Resurfacing~|~F9D82F75E1F99FBC4A8101325D0A4D2FACD7009F 114026~|~1~|~1~|~01/NFP~|~All work in this project.~|~13 - Bridge Rehabilitation~|~38872A26F9D0B882CB5DF368128FDE114DDDA06A 124720~|~1~|~1~|~01/SAF~|~Intersection improvements.~|~04 - Reconstruction - No Added Capacity~|~9E06CB29E7A9DEB23B0F054A93F18E77267BDB37 111638~|~1~|~2~|~02/SAE~|~Work funded by the safety program. 100% federal funds SAC 4HJ7. The safety funding is being used to replace Type A anchor assemblies with appropriate Mash 2016 anchor assemblies and up to 50? of guardrail at each anchor assembly.~|~21 - Safety~|~73C7C689D28F53A32E3A54A84D9574B7C060FC04 111638~|~1~|~1~|~01/IMS~|~Work funded with 100% federal funds from the District Preservation Program SAC 4PF7 at overheads on the Interstate system. The preservation funding covers any additional work requested by Highway Management not covered by the Safety Program funds which are in another plan split.~|~21 - Safety~|~6764B0BC491A043EE49667E40A175B328248662B 111638~|~1~|~3~|~03/NHS~|~Work funded with 100% federal funds from the District Preservation Program SAC 4PF7 at overheads on the NHS system. The preservation funding covers any additional work requested by Highway Management not covered by the Safety Program funds which are in another plan split.~|~21 - Safety~|~079A0A3A9546836DDEBE5FD79A7A21CC2B4715A9 120354~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4.~|~~|~AED8CB1B7163BDE8679417E68847D2DE0AE687DA 98992~|~1~|~1~|~01/S>2~|~Shipyard access road.~|~05 - 4R Maintenance - Resurfacing~|~A90EF365E7580F1CAB4CE292E549141B2F0925DB 100977~|~1~|~1~|~01/NHS~|~DSR# COL-004~|~04 - Reconstruction - No Added Capacity~|~F3C8F6E88A95D9AE01C5D953B905C5EF09AA0DF2 102771~|~1~|~1~|~01/S>2~|~This plan split is work on the large urban bridge.~|~13 - Bridge Rehabilitation~|~1446CFA6641748B40EAFFC2ED0815E0C99D428D7 102771~|~1~|~2~|~02/STR~|~This plan split is for work on rural bridge.~|~13 - Bridge Rehabilitation~|~5BF06AC30005127A3A7D23EB565577EF7A108697 125379~|~1~|~1~|~01/SAF~|~Lighting replacement.~|~21 - Safety~|~DE41F1CCDEB2D2EC936BD722A467FA6DD69B9861 88990~|~1~|~1~|~01/CMQ~|~Plan Split for SUM West Exchange Signals~|~21 - Safety~|~F4F6733C88727FB3F4EB974B937D6C59FD877C82 88990~|~1~|~2~|~02/NFP/Akrn~|~Non-eligible signal items.~|~21 - Safety~|~46183AE87032862777A6942ACF7E93E77FF96C5D 113595~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~412867A3A1EF70AD60B245B7152C4DA768ECCC05 124610~|~1~|~1~|~01/IMS~|~Plan Split for preventative maintenance work on interstate bridges based on critical findings report~|~47 - Bridge Preventive Maintenance~|~70A86A507B7234BEF7532EFD408ABA2CDB3214FB 124965~|~1~|~1~|~01/SAF~|~TAP/Safety eligible expenses~|~~|~D0263E6B5553E75BC3557A8F2961FB285A155FB9 125826~|~1~|~1~|~01/SAF~|~District 12 Intelligent Transportation Systems - S~|~44 - Other~|~796DDEAD016E656C7CF57A7940D8E8FCD6BD711E 123867~|~1~|~1~|~01/IMS~|~Emergency repairs to bridge following truck hit~|~13 - Bridge Rehabilitation~|~BEBE4B00AE689A7589BE08885377053A2F7B4F5A 114443~|~1~|~1~|~01/IMS~|~Resurfacing IR 70~|~05 - 4R Maintenance - Resurfacing~|~E8C00BBF6964D4DF1401D3986349AD9B5A3B280D 124804~|~1~|~1~|~01/BRO~|~Repair bridge by repairing and encasing the pier piling.~|~47 - Bridge Preventive Maintenance~|~3DDE2947230B5B6BD5D493753B83136B055926A0 124545~|~1~|~1~|~01/STR~|~Reconstruction~|~04 - Reconstruction - No Added Capacity~|~9661D2F22692F7CEBE29848B93BF2D042BE19685 114609~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance~|~21 - Safety~|~B03FADF9AE3B20460914112861222817EFA5A0DF 88923~|~1~|~1~|~01/NHS~|~Remove existing bridge (HAS-22-1724, SFN 3400964) over US 22, and realign road being carried by bridge to a new alignment to eliminate need for a replacement structure.~|~44 - Other~|~65FA7D8F01B86F48A49F10B394BA9CFA28FE18C7 88923~|~1~|~2~|~02/NFA~|~Relocation of TR 243 resulting from removal of bridge over US 22 (HAS-22-1724).~|~44 - Other~|~BD2D5CB7305A6AFF4B89B16C1904040D8CA6C339 90433~|~1~|~1~|~01/NFA~|~Culvert replacement project. WAS 260 10.20 (SFN 8403937). Not on any federal aid system funded 100% state.~|~17 - Construction Engineering~|~5E5969072F8683674FCBB43581AA98B97D44FB7A 88871~|~1~|~1~|~01/STR~|~general system chip seal pavement in various locations~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~316131EB0A7544B65A79892F143566CC0BB56380 92463~|~1~|~1~|~01/STR~|~SFN 3503186 HEN SR109 20.41 Intersect: Dry Creek~|~13 - Bridge Rehabilitation~|~D130303369C1B0C7EEEE3FFCD2B34090C2270A8E 117090~|~1~|~1~|~01/MPO~|~Primary Plan Split for all eligible work.~|~05 - 4R Maintenance - Resurfacing~|~662F6BC0420E9AE448FD2625C0C1AD9E3A9574E2 117090~|~1~|~2~|~02/SAE~|~Safety-funded work to remove the bump in on the south side at the intersection of Sylvania and Bellevue, installing high visibility crosswalk markings at that intersection, as well as installing the Rectangular Rapid Flashing Beacon and refresh the high visibility crosswalk markings at the Chessie Circle Trail~|~21 - Safety~|~63AD82E63A555BFB8F71A09063471E519C3B75F9 117090~|~1~|~3~|~03/NFP~|~Plan Split for locally funded scope, including signal upgrade that was not included in Safety award.~|~17 - Construction Engineering~|~D91CCA7C60C27BBDABCCB2E076BDA63CAA33FA78 96387~|~1~|~1~|~01/NFP~|~Demolition of three structures associated with widening project.~|~44 - Other~|~1B3262B74787E7224B9DA1118AA9CB1EABFA83EE 92005~|~1~|~1~|~01/S<2/HIG~|~SR73/Harry Sauner Road intersection and Harry Sauner Rd/Caretown Rd (CR10A)Intersection. Part 3. Part 1 & Part 2 are under PID 83987.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B4A9C4A1B6D58AB21573E59210292D6679E258C1 87618~|~1~|~1~|~01/S>2~|~Upgrade Storm Sewer on MAH SR 7 7.39~|~44 - Other~|~FF1C008687E1F4090D521FAA12EFD79BA2F117B9 96362~|~1~|~1~|~01/STR~|~Rebuild deck edges and overlay bridge deck with LMC using hydrodemolition. Patch abutment corners. SFN 5401208, MER SR 117-0181 on Town Run Creek.~|~13 - Bridge Rehabilitation~|~3A217CCC5829038DC7B3E7EBE880F0C03A4E8CC7 100449~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chipseal treatment. WAS 26 11.85-18.45. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2AE9EF741268AD3AE0E20E6B3C386DA095D288D0 121405~|~1~|~1~|~01/NFA~|~Beach Road Rehabilitation (SFN 2535882)~|~13 - Bridge Rehabilitation~|~279C6974B26C0C07280D522E13916200B57BAD6A 108113~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB CR 15 0.04, SFN 6132111. Funded by the Ohio Bridge Partnership Program, 100% Federal.~|~10 - Bridge Replacement~|~80246F0309733AFD341E73FCEA25D4D7FB17F7E7 104879~|~1~|~1~|~01/NHS~|~SCI 23 16.51 (SFN 7300395)~|~13 - Bridge Rehabilitation~|~5BF5A45C701D8E70001953471D7BA17DC9BA3694 99050~|~1~|~1~|~01/NFA~|~This project is for construction inspection FY16~|~17 - Construction Engineering~|~7A54283E73B11C64EA21BC7EE7F6E6611E908A61 99050~|~2~|~2~|~02/NFA~|~Project is for construction inspection in FY17~|~~|~E3157553EE28800E6566EE76CF8C185EEE8FC0E5 99050~|~3~|~3~|~03/NFA~|~This project is for inspection in FY15~|~17 - Construction Engineering~|~0B72559D0D09C8306C7FFF0D6E16482DAFB2BBEB 119138~|~1~|~1~|~01/BRO~|~Plan split for CEAO LBR funding eligible work to replace the structure (bridge SFN 2830493).~|~10 - Bridge Replacement~|~C367F8DF26A49A38998E8B4B3604A8328674E93C 118910~|~1~|~1~|~01/NFP~|~Spot paving throughout the district~|~05 - 4R Maintenance - Resurfacing~|~31F328237D34235FE6CFECDB615C8E69034AF996 76779~|~1~|~3~|~03/IMS~|~Plan split for work on Major Bridge (CUY-90-07.58)~|~13 - Bridge Rehabilitation~|~A357529F6F80893B6F205400B8E6EC5D28BEF7E1 76779~|~1~|~1~|~01/IMS~|~Split for major rehab work~|~04 - Reconstruction - No Added Capacity~|~25EFA0D7745F0E78BDB2D301A3E5B20D19F73C98 76779~|~1~|~2~|~02/IMS~|~Plan split for Bridge Rehab work to be completed with pavement reconstruction.~|~13 - Bridge Rehabilitation~|~987B85D5D8E517A29BB8CDBE1637B512D37DEAD9 112614~|~1~|~1~|~01/ENH~|~Installing sidewalks along Myron St in the City of Hubbard.~|~~|~C05552C5B67DFFF4A6F5ACDF1812C66BBFF3A009 104883~|~1~|~1~|~01/NFP~|~D09 Auxiliary Markings (A) FY2023~|~21 - Safety~|~90BD4F9DD8916024C3C18602C46BFE36C143E4B9 103405~|~1~|~1~|~01/STR~|~Landslide repair~|~~|~A6094661BFC970ABCB255021454FEE3DE3D1B95C 90809~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 160 0.00-8.92, VIN 324 0.00-4.44 and VIN 349 0.00-1.28. Federal 80% and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~5451A04B22386C09B14D87770F01BBD1B09879AF 114081~|~1~|~1~|~01/SAF~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4.~|~21 - Safety~|~5F34FCF375A35D252DC0F3D73D93EE942B8B0774 92611~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for work from SLM 0.00 to SLM 0.52 using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~A865A91E6C2190FE1EBB80C69615B1093EFEFC52 92611~|~1~|~2~|~02/NHS~|~80/20 fed/state funding split for work from SLM 0.52 to the NCL using NHS funding.~|~05 - 4R Maintenance - Resurfacing~|~DC35EEBEAA718217FD4F1D48DC070E886BA7EAEA 110533~|~1~|~1~|~01/S<2~|~Bridge Plan Split~|~10 - Bridge Replacement~|~E8C243DD5A4B293AA706AFDA8257933E40F1258F 112546~|~1~|~1~|~01/MPO~|~Split for MPO-funded work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C4CBFF79C6354198A5DACD4FB3C5236A01E9C367 99229~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-TR 90-0.02 (SFN: 0932868) which carries Myers Road over Browns Run.~|~10 - Bridge Replacement~|~734938DD645A1CB90AF78B01B2DA71DFC806CF96 123508~|~1~|~1~|~01/STR~|~All work on bridges included under the STP Rural classification.~|~47 - Bridge Preventive Maintenance~|~C2CB19AE346FB59E5593C88441A4B1FF7CAAE0CB 121163~|~1~|~1~|~01/STR~|~All Work is within this split~|~05 - 4R Maintenance - Resurfacing~|~7F4997D5F7C0CB419FE4FE17CA24EF323B2BAEDB 107885~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 550 15.70-15.74. DSR ATH-004. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BE080C305AFD8A46021EFC95E5704C22B2BFCD02 120489~|~1~|~1~|~01/S>2~|~Plan split for DEL-257-1.25 box beam bridge rehab.~|~13 - Bridge Rehabilitation~|~1BAEEF129275485EC954D3C3756480604296B0CB 108707~|~1~|~1~|~01/NFP~|~Change Gov. & Lt. Gov. names, & Ohio Slogan on various State Line signs throughout District 9.~|~44 - Other~|~4C454DA5D881872072188439B69F33E456ABE65F 88548~|~1~|~1~|~01/MPO/Huds~|~Update signal. Improve curb and gutter. SR91 15.20-15.21 turn lane addition. In the City of Hudson, Summit County, Ohio.~|~07 - 4R Maintenance - Relocation~|~319066C57D8D9EC4F8B34BD401D3ECD803623C91 111520~|~1~|~1~|~01/MPO~|~Upgrades to all existing signalized intersections in the City of Springdale, OH.~|~21 - Safety~|~47DF20B95322218596BDC749CD6727FCC328EE25 111520~|~1~|~2~|~02/MPO/SPR~|~Plan split for work at signalized intersections that do not meet warrants (SR 747 & Cassinelli Square, SR 4 & Maple Trace Drive, W. Kemper Road & Lawnview Avenue, Chesterdale Road & School, and Crescentville Road & Tivoli Lane).~|~21 - Safety~|~EA61E58F512B52639E537F7C04999D546D7CA555 108383~|~1~|~1~|~01/NFA~|~Landslide repair project. WAS 260 9.00-9.04. WAS_NF_0004. Non federal aid routed funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD57DB72DB06D21054BEB6C3A5B7236E23D1BC6D 124432~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~04 - Reconstruction - No Added Capacity~|~75D0471651BEF7DB6A2E2DB3D3D0AA770333CC90 101430~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for D05-BrCleaning-FY21/222~|~47 - Bridge Preventive Maintenance~|~B1DFAA48EE9F65D5E59E27387B2FE53D67BD3503 122440~|~1~|~1~|~01/MPO~|~TLCI items~|~28 - Facilities for Pedestrians & Bicycles~|~8FE4BA596C01E306E3C5F2A7924F7155FAE879A4 122440~|~1~|~2~|~02/ENH~|~Local-only items~|~28 - Facilities for Pedestrians & Bicycles~|~46B05107772A40A56704ABF4607EDDF98ADCF3D8 116033~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - ~|~21 - Safety~|~00D720B86425F99F0687D81FAC10BD1896E8200D 88491~|~1~|~1~|~01/STR~|~A 2-lane resurfacing from SLM 0.00 to SLM 9.11 in Williams County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A15187966ADA5D92C2A05F19FF40E365517690FF 88491~|~1~|~2~|~02/STR~|~WIL-20-6.44 bridge, SFN 8600996 concrete deck overlay.~|~13 - Bridge Rehabilitation~|~E45CFBFA9318570F436CF9FFB3295FDBA81D5942 111614~|~1~|~1~|~01/SAF~|~Installation of northbound left turn lane at SR 13/Cristland Hill Road intersection and related roadway work.~|~21 - Safety~|~D6596C802A7CFA35D30D5ED08B223329FC315DF1 125837~|~1~|~1~|~01/IMS~|~Bridge rehab on I-675 bridges over Garland Ave. ~|~17 - Construction Engineering~|~A0A7441C5EE96035EA5F1825450F1FB495D7630B 108936~|~1~|~3~|~03/SAF~|~high visibility crosswalk markings on US-127~|~21 - Safety~|~F40E2C340A93DCA7D8287F3ED26B9F18EA70AC00 108936~|~1~|~1~|~01/S>2~|~FU2022 Urban Paving in the City of North College Hill on US 127. This plan split is 80% ODOT and 20% City items on the Urban Portion of US 127.~|~05 - 4R Maintenance - Resurfacing~|~049148A7E48AB75355159178DBAF59F293A2172A 108936~|~1~|~2~|~02/S>2/NCH~|~FY2022 Urban Paving in the City of North College Hill on US 127. This plan split is the 100% City items on the urban portion on US 127.~|~05 - 4R Maintenance - Resurfacing~|~DA10A2768878BC91F84AC4CF2EDC54BB094FC389 108936~|~1~|~4~|~04/S>2~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 80% ODOT and 20% City items on the Urban portion of US 127.~|~05 - 4R Maintenance - Resurfacing~|~053299EBE9F47166B31D4A9569FB8BADD631B3FC 108936~|~1~|~5~|~05/S>2/MTH~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 100% City items on the urban portion of US 127.~|~05 - 4R Maintenance - Resurfacing~|~9F7A8E401623960E2A7D1BE6A0F3694011A24A3B 108936~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~2DC0115DA6414A23F673FF440FE78B4A83FBF889 84397~|~1~|~2~|~02/MPO~|~Plan Split for new precast structure over Little Cuyahoga Creek~|~~|~6F25814E5FB4B427E33CB9837B2604ACE839620C 84397~|~1~|~1~|~01/MPO~|~Plan Split for building a new route between Eagle Street and Englewood Drive~|~~|~B8DFA98FFC3E259EAE36A566FF15A3F5C0DDA660 127214~|~1~|~1~|~01/NFP~|~CO CO Plan Split~|~21 - Safety~|~58A6F542B4E29B6A779B9431FCD350479D5D74E2 110163~|~1~|~2~|~02/S<2~|~Resurfacing inside the Lima Urbanized Area but outside of the City of Lima. Work is on SR 115 in Allen County from where it begins at SR 65 at SLM 0.00 to the Lima Urbanized Area Boundary 0.35 from that location at SLM 0.35. All funds from the district preservation allocations.~|~~|~62E30103EEBB69137766F89842CFAC8576F3A765 110163~|~1~|~1~|~01/STR~|~Resurfacing outside of the Lima Urban Area using district preservation allocations. All work in this project on SR 115 in Allen County except to the portion of SR 115 which is in the Lima Urbanized Area.~|~~|~232C43FA622EBFC1870DDC135C07D1B506958DC9 127216~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the construction of the roundabout~|~21 - Safety~|~0B89B2B39C62A9892F2BC22510906D8E87F47EE1 109856~|~1~|~1~|~01/STR~|~PIK 220 5.50-7.03 & 9.77-10.96~|~05 - 4R Maintenance - Resurfacing~|~5E6146EDCA42B7BB1505535EA9ADEFDBFCF16EDE 109856~|~1~|~2~|~02/S<2~|~PIK 220 7.03-8.20 & 9.55-9.77 & 10.96-13.42~|~05 - 4R Maintenance - Resurfacing~|~85CE66067C9FC073CEA14CA686793B8CA852C379 108706~|~1~|~1~|~01/NHS~|~Bridge replacement in the City of Kettering.~|~10 - Bridge Replacement~|~A5DDAE63CF127CFF36F1C24424CB1EB50EDDA127 98408~|~1~|~2~|~02/S>2~|~Resurfacing of MAH SR 7 from 4.54 to 11.26.~|~05 - 4R Maintenance - Resurfacing~|~E163EE7A9A7BEE90FB8BA7D44317BBA2FE995C65 98408~|~1~|~3~|~03/S>2~|~Minor Bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~A72E4174E19461B34AD6FCAC820A872AFD479953 98408~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 7 from 3.58 to 4.54.~|~05 - 4R Maintenance - Resurfacing~|~2691923A023DA26571ACA48A912C0E2268069F46 98408~|~1~|~4~|~04/S>2~|~Replacing existing culvert.~|~04 - Reconstruction - No Added Capacity~|~DFC13C9171B57F23292EDD2828ED041CBE0B6865 98408~|~1~|~5~|~05/S>2~|~Ped improvements at State Route 7 and Stadium Dr, SLM 8.34.~|~05 - 4R Maintenance - Resurfacing~|~266DC664A08D4038A4E426E0C9C9F14F9AF63055 119134~|~1~|~1~|~01/STR~|~added plan split~|~05 - 4R Maintenance - Resurfacing~|~43A5ED2AEF3483850ECAE41BC6A0FDB3233DD21B 115793~|~1~|~1~|~01/NFP/WCEO~|~Replacement of the superstructure of Bridge No. WAR-TR 71-0.39 (SFN: 8334439)~|~13 - Bridge Rehabilitation~|~0F79DAACA2D12A0F741856381334CF4809B2EF02 93274~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of SFN 4201655 KNO US36 26.93 Intersect: Jelloway Creek; Not BR Eligible for Rehabilitation: Length=132 SD/FO(0) SR=85.9 DSR=5~|~13 - Bridge Rehabilitation~|~ABE7293942C2EABFB84959C23CF834842785561A 110364~|~1~|~1~|~01/STR~|~HIG 134 5.18-11.24~|~05 - 4R Maintenance - Resurfacing~|~8736002DEAA5B80E4E5816EF98488E25C94EBFBE 124195~|~1~|~1~|~01/SAE~|~This is a split for 100% Safety funding. ~|~28 - Facilities for Pedestrians & Bicycles~|~78E5816B4D8E696F2BDBBB8CCF110E4A0D77CFC2 98280~|~1~|~1~|~01/NHS/NEWA~|~"01/NHS/BR/NEWA" - plan split 01 for Lic-13-1034~|~10 - Bridge Replacement~|~6E19A8D63A99FEEF814014405A6879EED966EE84 118822~|~1~|~1~|~01/NHS~|~Plan split for resurfacing and drainage work on SEN-18~|~04 - Reconstruction - No Added Capacity~|~9FF39FE27BDE5A3CF72DEF12153D4932F05ECFDA 118822~|~1~|~2~|~02/SAF~|~Plan split for sidewalks along SR 18 and on PHB~|~04 - Reconstruction - No Added Capacity~|~B3296A554352FDC762AA7F63B02EA1333731923A 121909~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 32 2.62 (SFN 8435251).~|~10 - Bridge Replacement~|~0F3D9EB653585F6D7A1D3EAA3C6DC52E33212865 90791~|~1~|~1~|~01/S>2~|~Project will improve the roadway by resurfacing the existing pavement surface. Pavement will be milled 2in in the existing 2-lane section of roadway, and 3.5in in the 3 and 4-lane sections. The existing loop detectors at the southern leg of the SR-725 intersection will also be replaced.~|~05 - 4R Maintenance - Resurfacing~|~97FFB9FEC80031E6764D54C3D97190E9D27CB544 109608~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 376 6.02, SFN 5801680.~|~10 - Bridge Replacement~|~F5FC86AD079DCC52211C130C2895D0A1BC7526C5 97432~|~1~|~1~|~01/BRF~|~Work to include replacing the superstructure. 95% state funds SAC 4C87. The County Engineers Association of Ohio (CEAO) and ODOT approved the project to be part of the Federal/State Exchange Program. The 5% match is provided by the Allen County Engineer.~|~13 - Bridge Rehabilitation~|~86B6A6BBD5C594134295411FC1490E79CF70438C 116629~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~425FF703166146DB21F1D302E417DC7717FE945C 103642~|~1~|~1~|~01/S<2~|~DSR BEL-015~|~~|~5A213616D1E78997EF2244B4D61DA082E6277F95 126209~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~68CC1BED92E35D90C44B2ADB8E8FE809D076958E 127103~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~87208C8ED8E704871F1A8B32B011112460F09452 93851~|~1~|~1~|~01/BRF~|~Remove existing superstructure and beam seats to replace with new superstructure. Install a semi-integral abutment on two rows of drilled piles behind existing abutments. Stabilize abutments and wingwalls as necessary through grout injection and re-pointing of stonework. Cast-in-place a composite reinforced concrete deck and sidewalk on new steel beams. Install CIP concrete fascia barriers all on SFN 7560931 SHE WMICH 0568.~|~10 - Bridge Replacement~|~5EE2D94370475D3E7894AB9C1AD0E6E99E85D922 93851~|~1~|~2~|~02/NFA~|~The City of Sidney wants to relocate a fire hydrant, as part of this project. A new service line from the main to new hydrant location will be provided.~|~44 - Other~|~CA293D6E62FE5C3B0D40C8A2B364A3A4B980EACB 93851~|~1~|~3~|~03/NFA~|~Catch basin work caused by a construction error.~|~44 - Other~|~A53E35BAAD72767DC8ACB471EEE61153D64ABA5B 86983~|~1~|~1~|~01/S<2/HEBR~|~"01/S<2/OT/HEBR" - Village of Hebron project to add sidewalk and decorative lighting to enhance CR79A -4TA7/LC05 LCATS (80% Federal) / 4BG7 (20 Local) - CAP - Funding cap of $1.1 million. Lic-CR 79-00.89 to 01.76~|~28 - Facilities for Pedestrians & Bicycles~|~6035AF24B9732FAB46007F493C31EC43D9866892 110287~|~1~|~1~|~01/NHS~|~Repair and reconstruction of approximately 100 ft. of roadway embankment along SR-126 westbound. Work will require embankment repair and will require R/W.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0812700D371B97DA83700F947ADAC7327072AAA8 99571~|~1~|~1~|~01/SAE~|~Installation of pavement markings on various Ashland County roads.~|~21 - Safety~|~260278CC8996A37E253820EC65C607B40A5EAD79 99571~|~1~|~2~|~02/SAE~|~Split for Ashland~|~21 - Safety~|~A47B2719FB22731483D467E86B0E1F03795D2BFF 85064~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~4B5DE58CFD9A1DF70F44E5BCF62380712D84E00F 112936~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MRW-71-3.23-12.20~|~05 - 4R Maintenance - Resurfacing~|~A542D306946DEC67321EE9159F99EAC7FEA7CF47 102744~|~2~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~9BF1048358D23289F37FCDC553F1F4CD246D6911 102744~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~6E9E56ADE08FD7AAC76CEF833D04B00A2456F0E5 102744~|~1~|~2~|~02/MPO/AKRO~|~100% Akron items such as ADA curb ramps and full and partial depth repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EA7BAEAEF3E9B8C40C6D81E5911B7EDE9086BDC7 118602~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~7EB356825844B2166ED271FC2FFE5AAF0F3BDC24 108792~|~1~|~1~|~01/S>2~|~Replace local bridge~|~10 - Bridge Replacement~|~0C88306FDBBFD91BDF4CFFFAF628EBBB4D52F26C 87975~|~1~|~1~|~01/SAF~|~Upgrade existing signing along SR 126 in Hamilton County from logpoint 6.61 to 18.25.~|~~|~A73F19A4E8764E85CBBD574D992D2A628CBE3499 97964~|~1~|~1~|~01/STR~|~SR 54 SLM 4.88 to SLM 11.75 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in.)~|~05 - 4R Maintenance - Resurfacing~|~129DDD4A7D5D5EE42797C69FBBEF8D38F8F520C1 103345~|~1~|~1~|~01/S<2~|~Resurfacing and full depth repair where necessary on Jamaica Road from SR-123 to the north Carlisle Local School District limit.~|~05 - 4R Maintenance - Resurfacing~|~879A1D24C45714619FC8407DE0CBCA9E4E5D1F80 119699~|~1~|~1~|~01/BRF~|~All work included in this split.~|~10 - Bridge Replacement~|~A5E831CF8CA864C0F89779AF42A44575A98394A3 24857~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~671FD5CC0B44236BD7F6406D4E87A8639B50A96C 124651~|~1~|~1~|~01/SAF~|~Construction of loop trail around Bicentennial Commons Park~|~21 - Safety~|~E18B7C737F7AF6712C0EE78EB4E97125CAA513B6 124651~|~1~|~2~|~02/NFP~|~100% locally funded plan split for parking lot~|~21 - Safety~|~DED8B3045154CA9164F8A435ACFC99377196DB92 96151~|~1~|~1~|~01/NFP~|~Construction of a new outpost facility on Wright State University for multi-agency use.~|~01 - New Construction~|~A8C14FC7235DD4DA7FA9B4893280B6E95737B748 103781~|~1~|~1~|~01/NFA~|~LAW CR 104 2.40 (SFN 4445082)~|~10 - Bridge Replacement~|~FC5C0F98BFAEB8ED1ED6EA1551702A8B14CE8F57 95747~|~1~|~1~|~01/NHS~|~Plan split to resurface SR-2 from SLM 2.235 to 9.683~|~05 - 4R Maintenance - Resurfacing~|~F1EC6EFD9D960FB7CB3FEE8BBAD90D0D00458B30 95747~|~1~|~2~|~02/S>2~|~Plan split for resurfacing of US-20A from SLM 25.77 - 26.27 in Fulton County and SLM 0.00 - 2.235 in Lucas County~|~05 - 4R Maintenance - Resurfacing~|~06D6AF8ABC670F64D5F0CB1A2DB50A87AA4C0B58 117869~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~~|~9D6962EC3418A6DA025BAA96353C15C5E9A242BE 111321~|~1~|~1~|~01/SAE~|~Pavement marking on various routes in Highland County.~|~21 - Safety~|~0EF8699EFE834D1A0EA8FBBF9BB28C11A04FFE35 115230~|~1~|~2~|~02/STR~|~Resurfacing on SR 301 from West Salem north corporation limit to US 224 Intersection~|~05 - 4R Maintenance - Resurfacing~|~A24F8387F8D8C3A8209D16EA12FB4C04F23FBF3A 115230~|~1~|~1~|~01/SAF~|~Shoulder widening on WAY/MED-301 from West Salem Rd to Williams Rd.~|~21 - Safety~|~3CE6180524D3B9491FC841C567395FC0F2485D6D 114660~|~1~|~1~|~01/S>2~|~Project to Pave inverts of bridge size culverts and perfrom other related repairs Including HAM-747-0195~|~04 - Reconstruction - No Added Capacity~|~7C6E96C730F915571E48BAA9AB3E8BC81316564A 114660~|~1~|~2~|~02/IMS~|~Rehab of HAM-74 bridge size culvert~|~13 - Bridge Rehabilitation~|~BB35F0E45B14E7778AD2C38056D9E78636D37062 114660~|~1~|~3~|~03/IMS~|~HAM-275 culvert - Not Federal Bridge size~|~04 - Reconstruction - No Added Capacity~|~D8E0A53ACF899216A0DDD4D8A5CBC146B7F70E47 114660~|~1~|~4~|~04/NHS~|~CC funding event for HAM-2126 structure (NHS)~|~04 - Reconstruction - No Added Capacity~|~88F1000A116C19472550743A0FF285DB848CED37 88362~|~1~|~1~|~01/NFA~|~Replacement of MAH - North Lima Outpost facility.~|~01 - New Construction~|~E663330001B43532BB858CC7D3FB7169F6C7DE24 111637~|~1~|~1~|~01/NFP~|~Plan split for tree trimming work.~|~99 - State Preventative Maintenance~|~A21A881437841871A18FA6593BEE16BA5AA7162E 85678~|~1~|~1~|~01/SAF/HIG~|~Highland County CR5/CR74/TR192 Intersection improvementAll Non Fed Aid Routes but categorized as Safety since 80% CEAO safety funds are being utilized.It is proposed to improve the intersection of CR5 (Prospect Rd), CR74B (Pleasant Rd), & TR192A (Main Rd) by vertical profile adjustments at the intersection to meet 55 mph design standards and intersection and vertical sight distance standards. Marshal Twp, 1.23 mile east of SR125, intersections of CR5, CR74B, & T192A. HIG-CR-5 CHIGCR00005**C 17.660 to 17.670HIG-CR-74 CHIGCR00074**C 3.700 to 3.710 HIG-TR-192 THIGTR00192**C 0.000 to 1.010~|~04 - Reconstruction - No Added Capacity~|~AC290BE5EE88A5AF29D1DB5EF2131117358FFB24 115051~|~1~|~1~|~01/NFA~|~Medina County Park District's to Pave and Strip the parking lot at Killbuck Lakes.~|~44 - Other~|~658BCF7C718BC518233E051F10FE672E370A2AC2 80680~|~1~|~2~|~02/STR~|~All reference items except CMAQ eligible.~|~21 - Safety~|~8759B112F93659BB0EC0480ED346386FABFD1606 80680~|~1~|~1~|~01/CMQ~|~CMAQ eligible items on two roundabouts.~|~21 - Safety~|~FD564EA62021E1AC4C2C44AD52B4F420C555F088 124510~|~1~|~1~|~01/STR~|~Replace superstructure~|~13 - Bridge Rehabilitation~|~2AC1A1B92AC5CDDB0212B41E36ED03173D9474DB 103924~|~1~|~1~|~01/STR~|~Culvert Replacement: MED-162-11.70~|~04 - Reconstruction - No Added Capacity~|~D0E933C90ABFBCD255DF84FF9E578464F9727221 124615~|~1~|~1~|~01/S5K~|~Install new guardrails and upgrade current guardrails on various county roads.~|~21 - Safety~|~F4EAF3FB4A3E2D9A5B94920C42FE00F8ABAE1B74 100299~|~1~|~1~|~01/NHS~|~Microsurfacing of SUM US 224 10.22 to 11.22 and 12.71 to 14.05, SUM SR 91 0.30 to 0.72, SUM SR 93 5.98 to 7.78, SUM SR 241 6.70 to 7.78.~|~05 - 4R Maintenance - Resurfacing~|~E51F6513DFC7BA9AF5E1E68F70B526DE3DCC41A7 108335~|~1~|~1~|~01/S<2~|~OH18-01 ER Event. Landslide repair project. MOE 536 1.97, DSR MOE-020. Urban other federal aid funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D6C1E66607F7F3378764B4D02AAC695023B844A0 125827~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~E5F78688F152C2D0E17CA08881E47F58448384CF 100754~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. MRG 83 10.33-15.60 snf NOB 83 0.00-6.77. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F2378635F02E2D62D44F308E508BCA2A59F410E4 97936~|~1~|~1~|~01/NFP~|~Heat straightening of bridge beams of SFN# 7602340 over US-62, in the City of Canton, Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~C061D42253889CC83337A3FA96E3BAEB5449D03E 120450~|~1~|~1~|~01/S5K~|~Bridge Rehab~|~13 - Bridge Rehabilitation~|~1E040D4206150A794D0BE443ED2A6A60127EC871 124471~|~1~|~1~|~01/S5K/STCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~2E40246E0D15ECE0963D09241D48D102F7DC39DF 106471~|~1~|~1~|~01/IMS~|~FRA IR 71 SB from 27.77 to 29.66 DEL IR 71 SB from 0.00 to 0.84 FRA IR 270 IR 71 SB to IR 270 WB Ramp widening Provide additional SB lane by restriping and widening pavement. Widen SB to WB ramp to two lanes~|~21 - Safety~|~3CBC467AE8375CC5527B561E9CD7C05851E5236A 106471~|~1~|~2~|~02/IMS~|~Project Delay Costs due to DB scope issue~|~21 - Safety~|~E533247D607D3EB1B964714BE5FB374D016064F6 82872~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. WAS 7 31.55-37.23. NHS Federal/State 80/20%.~|~05 - 4R Maintenance - Resurfacing~|~43FD984B5483AD40289E15A2523FA3AE9F312577 110860~|~1~|~1~|~01/STR~|~Slide repair ADA-125-22.18~|~04 - Reconstruction - No Added Capacity~|~025402BD7647863EFFB04ADDF63C4B2D5CBA95EB 94797~|~1~|~1~|~01/S<2~|~STP:-resurfacing only between station 187+25 and 205+00-all bridge work at Buck Creek and associated MOT costs-all costs associated with the profile adjustment and resurfacing from station 2017+00 to Columbus Avenue.~|~05 - 4R Maintenance - Resurfacing~|~098DC2249241D7016A4BFF5440C4FE604399B1F1 94797~|~1~|~2~|~02/CMQ~|~CMAQ:-all widening, drainage, striping, MOT, underdrains, and all asphalt for widening/resurfacing for the roadway and bike lanes between SR4 and the existing bike trail at station 187+25 (essentially all work from SR 4 to 187+25); the roadway resurfacing can be included with CMAQ on the sections where we add bike lanes; -left turn lane addition from station 205+00 to station 217+00; include all pavement costs, grading/drainage/striping/MOT/etc. -any drives impacted by the bike lanes or left turn lane;~|~05 - 4R Maintenance - Resurfacing~|~DCA45D36F26AAB0E8C863FB0201D5441F26F86E2 108519~|~1~|~1~|~01/IMS~|~See linked structure > 20' span.~|~~|~1F5DD17D74DBDCB0749A9A0447954E78DBD24DB2 84663~|~1~|~1~|~01/IMS~|~Resurface IR 70 with Item 446 asphalt concrete on CLA IR 70 10.55 to 13.98.~|~05 - 4R Maintenance - Resurfacing~|~517A6CD0804D7131F7DC47619D879AD6E722D197 91608~|~1~|~2~|~02/NHS~|~Flood entire decks with SRS (Soluble Reactive Silicate) 705.24 at various locations on USR 35~|~13 - Bridge Rehabilitation~|~C392ADCE3F22B8BD819125A7785B144FA4D10718 91608~|~1~|~1~|~01/BRO~|~Deck overlay on SFN 5701929 MOT US 35 15.76~|~13 - Bridge Rehabilitation~|~FD53F7307CAC4C23767FFB5482E164C4500CAA0A 89422~|~1~|~1~|~01/STR~|~District Wide Pavement marking - Routes/Classifications coming~|~44 - Other~|~B38ACFCE48D6F2341B1719D88E741019B015807E 94444~|~1~|~1~|~01/NHS~|~Bridge Coating- All locations on ERI-SR-002 and ERI US-006.~|~13 - Bridge Rehabilitation~|~C1D310A8601A503D869F7B92660A48443F67A8BD 94444~|~1~|~2~|~02/IMS~|~Bridge Coating-MED IR 0076 01.30R~|~13 - Bridge Rehabilitation~|~9FD9590C3C0C1329180F368EEA9B14269B3C1B40 97032~|~1~|~1~|~01/NFA~|~It is proposed to install install new guardrail at various locations on CR's 85 & 116 in Pike County in FY 2015~|~21 - Safety~|~71731CBAD2E64AD98556D5F5D8F0858C54A09CEC 97032~|~1~|~2~|~02/S<2~|~CR 116 (0.00 to 2.56)~|~21 - Safety~|~DE40D865F51463C415FD728ACCB6B820FF1426AE 82889~|~1~|~3~|~03/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 146 8.15-8.33 and NOB 147 0.00-2.60. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~2147208EF1AC141509342B82D9CF85C1C55A7D70 82889~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 285 0.00-0.30. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~487644B391EA52C10B15E6EB3694898E168155A5 82889~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 146 8.33-9.40, NOB 215 0.00-4.61 and NOB 285 0.30-5.31. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C5DBDD66DCB8F66A8AB3714F66F4E33CDDA4C7B3 107062~|~1~|~1~|~01/STR~|~Bridge replacement project on MEG 124 55.30, SFN 5301809.~|~10 - Bridge Replacement~|~519C0CC5358EBB71F903D3FD6418C33A76467307 119688~|~1~|~1~|~01/S>2~|~Install a shared use path along Dublin Rd from 1,650' south of Noreen Dr to Limestone Ridge Dr. ~|~28 - Facilities for Pedestrians & Bicycles~|~58C60BCAF44CBE721518F80409EF9B12C6F443BB 115257~|~1~|~1~|~01/ENH~|~Construct Shared Use Path.~|~28 - Facilities for Pedestrians & Bicycles~|~A4653D3505D78CC54C438DC6F89BACF7148F5FD4 115257~|~1~|~2~|~02/S5K~|~Asphalt Resurfacing of SR 259 in the City of New Philadelphia, funded at 80/20 with D11 Preservation Funds.~|~05 - 4R Maintenance - Resurfacing~|~620EB733F19F91702B2E4684F46D08FA5B784FFE 96841~|~1~|~1~|~01/SAF~|~Installation of RRFB~|~28 - Facilities for Pedestrians & Bicycles~|~2D4D303352F26DA7D92CE00BBC1649B7E962091B 116785~|~1~|~1~|~01/ENH~|~Multi-use path on Big Walnut Trail from Turtle Station Way to Mt. Hood Court (Alum Creek Trail). ~|~28 - Facilities for Pedestrians & Bicycles~|~BACE751930194AE4D0CFBC57B201277467979E82 116785~|~2~|~2~|~02/ENH/COC~|~100% locally funded items, such as added trees.~|~28 - Facilities for Pedestrians & Bicycles~|~31664CBA83BA0B7F58C0294C879F1C0A0BF0D1D7 119880~|~1~|~1~|~01/BRF~|~Bridge replacement funding at 100% with Municipal Bridge Federal Funds.~|~10 - Bridge Replacement~|~511D2C319BD52FA95D6669536FACFDEC3AB52FC0 127190~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~0072F44E3AA7E84346BAE02661C8890FB8F8C8FE 126596~|~1~|~1~|~01/CMQ~|~Construct a multimodal roundabout with sidewalks and protected bicycle lanes at the intersection of Shamrock Drive and SR 147 in Barnesville, utilizing CMAQ 4TB7 and Local funds. ~|~21 - Safety~|~4EDE2CFD39D61F467E7828376DA8105F828863B3 109981~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 376 8.10-8.20. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~510808398DA0F6F30572BC539011F5FDE5E077FF 109981~|~1~|~2~|~02/STR~|~Landslide repair project. MRG 376 8.10-8.20. 80% Federal ER and 20% State funds. Associate Add~|~17 - Construction Engineering~|~CC078804E36DD32329C26B1670748A77354D0F66 122884~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~1FC3E632CDFE9C2A1FBE9D4C421D5E72E27B9CFF 127091~|~1~|~1~|~01/NFA~|~SOPEC EV charger projects ~|~63 - Electric Vehicles & Charging Infrastructure~|~EA71B63D48EC6C9C3D6531F60742F4F75BBC347D 87135~|~1~|~1~|~01/STR~|~This split is for the resurfacing work on SR 309 from 0.00 to 5.59 which is outside the Lima Urbanized Area and has a rural classification.~|~47 - Bridge Preventive Maintenance~|~051225119F67C8172AB8F16CE452ED90E2FAF385 87135~|~1~|~2~|~02/S<2~|~This split is for the resurfacing work on SR 309 from 5.59 to 5.77 which is inside the Lima Urbanized Area and has an urban classification.~|~47 - Bridge Preventive Maintenance~|~5B1FA54843AFB268DFCB9CE98CA9CE7651957E89 120348~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~230C3363958A2ECD66B9765AC7FB45BC9E749642 117946~|~1~|~1~|~01/NFP~|~Systematic guardrail repairs/replacements and maintenance on various routes throughout District 4.~|~21 - Safety~|~E3DACE407C4C4EF019CDDA5037ACC15F469A83ED 112828~|~1~|~1~|~01/NHS~|~D09 Overlay FY27~|~05 - 4R Maintenance - Resurfacing~|~A6ABA75797BA48F1DA37F484266676AAC77A0D3D 87331~|~1~|~1~|~01/STR~|~7304471 SCI SR140 9.73 Intersect: Stream80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~E2936FA0B51EDF5A8B42E75C51C375D8C17BDA24 99627~|~1~|~1~|~01/NHS~|~Added split for paving work at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~80A11DCEC304936727C079C8EB6CBAF9543618E9 106416~|~1~|~2~|~02/NHS/STRE~|~Culvert work.~|~04 - Reconstruction - No Added Capacity~|~E892C7BA3D2FA2CDC5EA8F135DEC7930ACA7717E 106416~|~1~|~1~|~01/SAF/STRE~|~Widening of POR SR 43 to accommodate a Two Way Left Turn Lane.~|~04 - Reconstruction - No Added Capacity~|~51E78861AFCE52FADF479985766AF14CA3A750B5 118667~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~46549718ACE32BB388D595DA4EEC5FD21E8CEECC 92776~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Slip repair on LIC SR13 7.76-7.83~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A80C377A9D4BF993CC65036C9B9AA3675B463DFA 92776~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Slip repair on LIC SR13 7.7-7.76~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F077911A6B335603607F1CF164F44D7BE0FF39D4 92113~|~1~|~1~|~01/IMS~|~resurface LUC IR 75 1.99-4.89 - Nebraska Rd to Central Ave~|~05 - 4R Maintenance - Resurfacing~|~CD3124F9120165A97098CD6166DE42C3A4AE5A4E 97372~|~1~|~1~|~01/IMS~|~Split for all interstate bridge work at 90/10.~|~13 - Bridge Rehabilitation~|~B21E8E3B73DC07B529137F48E02658529A74A713 97372~|~1~|~2~|~02/NHS~|~Split for NHS bridges at 80/20.~|~13 - Bridge Rehabilitation~|~A842B3AA24D002346A61EC1EFFB3523799F029A2 100328~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project.~|~21 - Safety~|~E56FF9F06B70FAC3FA6678EC66B688FA6D2BE728 108359~|~1~|~1~|~01/STR/SOME~|~"Jobs & Commerce" and "Appalachia Regional Council" Funding - 4JC7 (100% State) - 4D37 (100% Federal) - CAP (See Comments) - Construction of access road connecting to SR 13 at the 17.00 mile marker for patients and emergency vehicles entering the Genesis Perry County Medical Center in the Village of Somerset.~|~01 - New Construction~|~16DB150BEA73A14B38AAECAB9336F2EC6ED4CC2B 121867~|~1~|~1~|~01/NFP~|~Bridge work on various structures in District 5.~|~47 - Bridge Preventive Maintenance~|~31CA9E0A6ADF9A17A35E63EC8E3641F04CABE476 105732~|~1~|~1~|~01/MPO~|~For federally eligible items~|~03 - Reconstruction - Added Capacity~|~96F26BEBB4C22457F3763703B6566D8668526A62 105732~|~1~|~2~|~02/MPO~|~For 100% local items~|~~|~3548FFB9E0FFFDB9380635F882EEB01B4BBFE83B 105732~|~1~|~3~|~03/MPO~|~100% local funds for Division of Water (DOW).~|~03 - Reconstruction - Added Capacity~|~9EA0CC690EB4488C754ED7F537BD19D141C2BE16 81747~|~2~|~5~|~05/NHS~|~NHS funded pvmt workMainline SR-315 work, I-270 CD ramp work due to adding capactiy, retaining wall #14~|~03 - Reconstruction - Added Capacity~|~0763147921C0A84FD458ED363EDD5B10A993430D 81747~|~1~|~1~|~01/NHS~|~Adding capacity to 270 EB CD lanes, ramps, 315 ML workGeneral roadway items, lighting, retaining walls 1, 1A, 1C~|~03 - Reconstruction - Added Capacity~|~1CCAA601C232A20BED9B54F739990AD81C3FDD3E 81747~|~2~|~9~|~09/NHS~|~NHS funding for bridge rehab/no capacity (not BR eligible):SFN 2515962 FRA-315-12.20L - Wilson Run~|~13 - Bridge Rehabilitation~|~320F632FCDB75F9C6852A1220AD6DD145616FBE5 81747~|~1~|~3~|~03/NHS~|~Bridge rehab for existing bridge:2510952 FRA IR270 22.94B Rt Ramp Over Olentangy R~|~13 - Bridge Rehabilitation~|~3B1C62577AC191B8FE5256028F4CF8362D7F1668 81747~|~1~|~10~|~10/S>2~|~Incremental cost of fence enhancement along the bikeway to be paid by the City of Columbus recreation and Parks~|~44 - Other~|~ACB842112E4AACC84158B1F55B6E84EACCEF0EA1 81747~|~1~|~11~|~11/SAF~|~payment to contractor for damage to a tower lighting controller~|~~|~E1FDE653C336C7840CD5EE07AAA2B6E606E085C7 81747~|~1~|~4~|~04/ENH~|~Enhancement funding for adjustments to bikepath under 270/315 ramps and along 315~|~28 - Facilities for Pedestrians & Bicycles~|~4AB1F05F35C4762C9382B3E160DE6FD70C9D7BDF 81747~|~2~|~6~|~06/NHS~|~NHS funded new bridges:SFN 2511061 FRA-270-23.69ASFN 2511053 FRA-270-23.54ANew Retaining wall 12 & 13 for new bridges~|~08 - Bridge - New Construction~|~958FA67F16C7D8C2133E260E4B8BB87DF09D46C5 81747~|~2~|~8~|~08/IMS~|~IM funding for bridge replacement without capacity (not BR eligible):SFN 2510839 FRA-315-12.15~|~10 - Bridge Replacement~|~B293C1D3A1100D012F281AE6A5DAD39852C4018B 81747~|~1~|~2~|~02/NHS~|~Retaining Wall 3 (for FRA-315-11.80 bridge) and retaining Walll 4 (for FRA-270-22.78B bridge) and construction of 4 New Bridges:SFN 2510758 FRA-270-22.65BSFN 2510871 FRA-270-22.78BSFN 2510901 FRA-270-22.93BSFN 2515857 FRA-315-11.80~|~08 - Bridge - New Construction~|~D2F6CA8BED613728AC9887D222D8A6085EBE25AC 81747~|~2~|~7~|~07/NHS~|~NHS funding for bridge rehab with capacity (not BR eligible):SFN 2510928 FRA-270-22.94A~|~13 - Bridge Rehabilitation~|~E72E7D17DE3D5066AA97296DB954D28BADF4F612 96959~|~1~|~1~|~01/STR/SCI~|~SCI 73 11.93 (SFN 7302649)SCI 73 12.05 (SFN 7302673)~|~10 - Bridge Replacement~|~6AAA9244CEEE622713ED8F68C845B92C8CF415A9 103930~|~1~|~1~|~01/IMS~|~Reconstruct 400' of failing slope on SB IR-271 at 8.85 and install new drainage system.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4215447E33B45319E62D6BEF6AA54E12DE652FE8 100000~|~1~|~1~|~01/IMS~|~Split for culvert work~|~44 - Other~|~C30B74D024AFA5E756846B9BB367C6F353A99130 121755~|~1~|~1~|~01/MPO/POCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~34669291B2FF73FA7E4914C94ED1185FF6535FB8 96603~|~1~|~1~|~01/IMS~|~Work to replace culverts at 15.36. These culverts meet the state definition of a bridge, but not the federal definition. Funds will be from the District Preservation Program budgets SACs 4PF7 and 4PS7.~|~44 - Other~|~D50AD5425C0E9DB0B7B9B1F2F02FB3D03DFA2477 117576~|~1~|~1~|~01/NFA~|~Bridge replacement project. VIN CR 7 3.00, SFN 8230102. Funded 100% Federal.~|~10 - Bridge Replacement~|~74C08A28ACEF2878635599B80C6AEFE8AAE9FE45 104949~|~1~|~1~|~01/S>2~|~Plan Split for Bridge FRA-665-14.00~|~13 - Bridge Rehabilitation~|~BE1BD385CB6D7AD079767D6CC01E50C37C769801 86657~|~1~|~1~|~01/NFA~|~Construct a trail along Austin Pike, North of the Dayton Wright Brothers Airport, and proceed northwesterly toward and thru Waldruhe Park from SR 741. The trail will procees North to the Eastern side of SR 741, connecting with and existing trail.~|~28 - Facilities for Pedestrians & Bicycles~|~F21F928C27FC48AA033D85C5B860415B7FF3FB0E 107814~|~1~|~1~|~01/ENH~|~Add new sidewalks along SR 91 between Conwill Rd and Fishcreek Rd in the City of Stow.~|~28 - Facilities for Pedestrians & Bicycles~|~DB67E49506B1C50E1527911C7124AE8E12F080CF 100259~|~1~|~1~|~01/MPO~|~Rehabilitate Main Avenue using MPO STP funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4B836F5AB534DD5FE0095A5D7F667CC6104FEEC 107458~|~1~|~1~|~01/NHS~|~Resurfacing of STA US 30 from 0.00 to 9.61.~|~05 - 4R Maintenance - Resurfacing~|~D9D71ACC3B7920EDF9F7ED9F5F6AA5E009322398 97325~|~1~|~3~|~03/S<2~|~Culvert replacement project. GAL 588 10.09 (CFN 1829091). Urban other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~49432958FCB7FC0C762D83FCAB5811A991B09B93 97325~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 7 1.36, CFN 1829095. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7368A775E7484C36997131A17E96041A087691DE 97325~|~1~|~2~|~02/STR~|~Culvert replacement project. GAL 325 9.91(CFN 1827843), GAL 325 10.72 (CFN 1827849) and MEG 325 3.84 (CFN 1824853). Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A26FCECC800FD7586BF4679FE80D793CAF13F028 92458~|~2~|~6~|~06/S>2/PICK~|~"06/S>2/OT/PICK" - Local Funding - 4BG6/4BG7 (100% Local Funding) - CAP OPWC (4BG6) at $30,000.00 - 100% Local costs in City of Pickerington (i.e. curb ramps, etc): 1) Fai-SR 256-00.39-00.50; 2) Fai-SR 256-02.50-05.99;~|~05 - 4R Maintenance - Resurfacing~|~0C4F7A2BF893667A8D15B5105724D6EA5B23BFAE 92458~|~1~|~10~|~10/S>2~|~"10/S>2/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Signal Upgrade on ODOT maintained signals at the IR 70 on ramps: Fai-SR 256-00.38-00.58;~|~05 - 4R Maintenance - Resurfacing~|~3633F6AED15D4AD7557EBE114ED79BA73FA9C6B7 92458~|~2~|~3~|~03/S>2/PICK~|~"03/S>2/PV/PICK" - District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG6/4BG7 (20% Local Match) - CAP OPWC (4BG6) at $243,667.00 - Urban Paving in the City of Pickerington: 1) Fai-SR 256-00.39-00.50; 2) Fai-SR 256-02.50-05.99;~|~05 - 4R Maintenance - Resurfacing~|~39A4E5F01374898E0F63799B4A897DD4D1AA165C 92458~|~2~|~5~|~05/S>2/PICK~|~"05/S>2/OT/PICK" - District Preservation Marking Pavements - 4PF7 (80% Federal) / 4BG6/4BG7 (20% Local Match) - CAP OPWC (4BG6) at $10,000.00 - Urban Paving Striping in the City of Pickerington: 1) Fai-SR 256-00.39-00.50; 2) Fai-SR 256-02.50-05.99;~|~05 - 4R Maintenance - Resurfacing~|~3ECE356867519040B92DF722A93EBF33DC512243 92458~|~1~|~7~|~07/SAF/PICK~|~"07/SAF/OT/PICK" - Safety Program 4HJ7 (90% Federal) / LNTP (10% Local)- CAP $9212.00 Total if authorized per Agreement - On Going Consultant Services through Contract held by the City of Pickerington.~|~17 - Construction Engineering~|~475E9F1864C6C963C0CA6AB96D58A80C8C910690 92458~|~1~|~8~|~08/SAF/PICK~|~"08/SAF/PV/PICK" - Safety Program - CAP = $1,571,607.62 (4HJ7 - 90% Federal) / $174,623.07 (4BG7-Local) - Safety project paving on Fai-SR 256 00.50-02.50 and turn lane addition.~|~21 - Safety~|~4ED40D62C192FCF2BB39E906F1F380AF12AF8BFB 92458~|~2~|~2~|~02/S>2/REYN~|~"02/S>2/PV/REYN" - District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local Match) - No CAP - Urban Paving in the City of Reynoldsburg: Fai-SR 256-00.00-00.39;~|~05 - 4R Maintenance - Resurfacing~|~5B3CF94B0055B3FEE45760882F7459BE0C7156C5 92458~|~2~|~4~|~04/S>2/REYN~|~"04/S>2/OT/REYN" - District Preservation Marking Pavements - 4PF7 (80% Federal) / 4BG7 (20% Local Match) - No CAP - Urban Paving Striping in the City of Reynoldsburg: Fai-SR 256-00.00-00.39;~|~05 - 4R Maintenance - Resurfacing~|~CC0B719680AD47ED17C22E79F4C7D77ADAD7BEF7 92458~|~1~|~1~|~01/SAF/PICK~|~"01/SAF/OT/PICK" - Safety Program - CAP = $2,765,846.38 (4HJ7-90% Federal) / $307,312.93 (4BG7-10% Local) - Safety project on FAI SR 256 0.5-2.50 to upgrade signal equipment and add medians and sidewalk along SR 256 from I-70 to the Kroger/Giant Eagle signal in Pickerington.~|~21 - Safety~|~E24B2ACA44E33138CF0C694A8954E3168931860C 92458~|~1~|~9~|~09/S>2/REYN~|~"09/S>2/OT/REYN" - Local Funding - 4BG7 (100% Local Match) - No CAP - Curb ramps and any other City request in the City of Reynoldsburg: Fai-SR 256-00.00-00.39;~|~05 - 4R Maintenance - Resurfacing~|~F13A41403764505A7BC421D582D4C188844789A3 117671~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~1C461C5D4FD3D78E3EC830E7CC96186D8D12C895 107492~|~1~|~1~|~01/STR~|~Resurfacing SR 183~|~05 - 4R Maintenance - Resurfacing~|~5BF3CF742106E09AE0C88EAB71CCF3E2EC76ACE1 96800~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~686C44F0027FF6F0F9CCB0C2DFF634374F0216ED 90934~|~1~|~1~|~01/NFA~|~Bicycle canopy, signs~|~~|~874C6E7DCC4E6AA013C087EBA66E8941C51CE45B 114874~|~1~|~1~|~01/STR~|~Overlay in BRO~|~05 - 4R Maintenance - Resurfacing~|~3CAC0A51C3F0724E99A3291A39B7C930065A61DE 100030~|~1~|~1~|~01/IMS~|~Provide maintenance and upkeep of the existing landscaping at the I-70/I-75 Interchange in Montgomery County.~|~31 - Landscaping & Other Scenic Beautification~|~AE184E22F19696AA0A6C2E49B493CC9072C25D61 118525~|~1~|~1~|~01/S5K~|~Install sheet pile retaining wall along SR 56~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F8EEA0AE8114A878524454C8CA58A9D923923C5 118525~|~1~|~2~|~02/S50~|~100% plan split for the City of Circleville guardrail.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~737DC1B570C6B97E353284203614B5E5D2C04200 101338~|~1~|~1~|~01/STR~|~Bridge Rehab.~|~13 - Bridge Rehabilitation~|~B4A796230EC3D4CE2D1598AD6F07C1B6C8460AFA 84622~|~1~|~2~|~02/S<2~|~HIG 138 (16.30-16.64)20% local match~|~05 - 4R Maintenance - Resurfacing~|~E20B3A90CCC6D0BE8D44F9D0C53483E5A5CDDA4E 84622~|~1~|~3~|~03/S<2~|~HIG 138 (16.64-18.26)~|~17 - Construction Engineering~|~701C75B808710C46887D3377AC7BC8437526D966 84622~|~1~|~4~|~04/STR~|~Bridge repair HIG 138 18.48 (3603105)HIG 138 21.07 (3603121)~|~17 - Construction Engineering~|~C137A2A79A547B9DC58F2508CF21059274246A7D 84622~|~1~|~1~|~01/STR~|~HIG 138 (18.26-22.93)HIG 753 (8.04-13.10)~|~05 - 4R Maintenance - Resurfacing~|~2E3868BCFBDE46A817F5592685DF6F52F4D620FD 124496~|~1~|~1~|~01/SAF~|~Plan split for all roundabout work at SR-579 & Fostoria Rd.~|~21 - Safety~|~6BEE5457276C357FD28D5A5F36559C521387BABE 125062~|~1~|~1~|~01/SAF~|~Plan split for safety funding to build pedestrian facility~|~28 - Facilities for Pedestrians & Bicycles~|~46B222FB14156114043C73AE666D015DC755686C 125062~|~1~|~2~|~02/NFP~|~Plan split for non-eligible items of work at 100% local cost.~|~28 - Facilities for Pedestrians & Bicycles~|~242ECE326D9B531FFBE2FADE72F7F3C0207509E4 92160~|~1~|~1~|~01/NFP~|~Fast Dry pavement marking for 1 year~|~21 - Safety~|~A2E3AB038069B20E20EC7C345815EB2BD51C1E82 125777~|~1~|~1~|~01/IMS~|~Plan split for CLE I-275 5.68 bridges. ~|~13 - Bridge Rehabilitation~|~271648FF48AAF9858129E9B1624AB71DB1B3DE3D 112957~|~1~|~2~|~02/NFA~|~ROS 372 0.00-0.68~|~05 - 4R Maintenance - Resurfacing~|~AEDC0B070699F4FB6522FACC1BD153D58136A6C2 112957~|~1~|~1~|~01/NHS~|~ROS 23 0.00-1.95~|~05 - 4R Maintenance - Resurfacing~|~067D430145885C5DD95A8D3F048E0C6BDAEB4780 107382~|~1~|~1~|~01/IMS~|~Split for paving work~|~05 - 4R Maintenance - Resurfacing~|~DB50CE344A9F23B8385CD78B698232858C56A019 109692~|~1~|~1~|~01/SAF~|~Shoulder widening using 90% Federal Safety funds (4HJ7) and 10% Local funds (LNTP).~|~21 - Safety~|~92B9065EF5F0F4B662617389366003892C494DC3 105742~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items):LOR US 20 19.830 to 22.060 60-AC Overlay w/RpR NORTH RIDGEVILLE LOR-US-20 24.560 to 25.730 60-AC Overlay w/Rpr NORTH RIDGEVILLE: ~|~05 - 4R Maintenance - Resurfacing~|~690E464FAF2CDB69D1F6B7155205257084981639 105742~|~1~|~2~|~02/NHS~|~100% Local:Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps etc.):LOR-20-19.83 to 22.06/24.56 to 25.73~|~05 - 4R Maintenance - Resurfacing~|~4A0449FE40EDDB2AE9A87F0E4FF0B9123845254B 95076~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $265,000 - Rockfall Barrier Installation at LIC-IR70-21.44~|~~|~EDEEED4B6B37028D168C2F581956125138FFCDA6 98662~|~1~|~1~|~01/STR~|~Bikeway improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~2FCC907FC562DDE0103BE207ACBF19ADBF61B784 103875~|~1~|~1~|~01/SAF~|~Safety project ROS 159 Bridge St.~|~~|~64217E835C57CBDDB6D681B4FCEDABBED01C826A 104977~|~1~|~2~|~02/IMS~|~Interior Shared Use Path Barrier along bridge and associated drainage items - 100% CoC funded.~|~13 - Bridge Rehabilitation~|~4ADE2299DBF9992F8783920CD40A2B1BEF74365F 104977~|~1~|~1~|~01/IMS~|~FRA-270-6.17; Sullivant Ave over IR 270 deck replacement~|~13 - Bridge Rehabilitation~|~213D31E9D5C20909B3853E19B2676923C74910D4 76032~|~1~|~3~|~03/IMS~|~4804058 LUC IR75 7.62 Intersect: Stickney Ave. 4804171 LUC IR75 7.78 Intersect: Cecilia Ave 4804260 LUC IR75 8.07 Intersect: Ramp Nb 280 To Sb 75 4804325 LUC IR75 8.17 Intersect: I 280 Sb~|~10 - Bridge Replacement~|~83BEA972B6BD1250237EAFB2033A9F34DC8117C8 76032~|~1~|~1~|~01/IMS~|~LUC IR75 6.7-8.4~|~03 - Reconstruction - Added Capacity~|~BF09BB17903C1C971585BC825622F14F523EFE07 76032~|~1~|~2~|~02/BRO~|~4803965 LUC IR75 7.24 Intersect: Cross Road 4804414 LUC IR75 8.49 Intersect: Chrysler Dr & Annarbor Rr~|~10 - Bridge Replacement~|~E291F7797B02D57FEDE6714B163307EDFDC1622D 76032~|~1~|~4~|~04/IMS~|~Detour thru I-280~|~03 - Reconstruction - Added Capacity~|~B1E0597AC9BAF5AFC24402949CF632F9E1B00524 114952~|~1~|~1~|~01/NHS/FAIR~|~Resurfacing, urban paving in the city of Fairlawn.~|~05 - 4R Maintenance - Resurfacing~|~360FC497F4731D6EEEA4210BE4A9E8E1D8E0F676 114952~|~1~|~2~|~02/NHS/FAIR~|~Full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~1E47E227114FD056AA3E6493A0D01508C911BEA9 101577~|~1~|~1~|~01/S>2~|~Rehabilitation of the existing pavement surface including full depth pavement repair of failed areas, reconstruction of storm inlets, pavement milling and resurfacing with 1-3/4? of asphalt intermediate course and 1-1/4? of asphalt surface course, and application of new pavement markings. Sharon Road from Crowne Point Drive to Mosteller Road.~|~04 - Reconstruction - No Added Capacity~|~C0E9D66AAB59F83D2C3C3523707E0764C64B163C 123908~|~1~|~1~|~01/ENH~|~Sidewalk improvements and associated items utilizing OMEGA funding up to associated cap. ~|~28 - Facilities for Pedestrians & Bicycles~|~DB08FF573D5A123D71137FEFBD071AA28416DA8D 123908~|~1~|~2~|~02/NFA~|~Paving and drainage work items utilizing OPWC funding up to associated cap. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~29B04872C34ED744E5A204A47261B07F4013B45E 117722~|~1~|~2~|~02/S>2~|~Asphalt Concrete Overlay with RepairsMED-162-26.740 to 26.751~|~05 - 4R Maintenance - Resurfacing~|~CDE6DAC54D16735EA04C2DFA8729DB6224A7DA92 117722~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with RepairsLOR-162-0.00 to 8.743MED-162-24.168 to 26.740~|~05 - 4R Maintenance - Resurfacing~|~46166CCDD4CFF2EA3095EE24077BE59FE1D8778F 92667~|~1~|~1~|~01/MPO~|~Plan Split for MPO STP Funds~|~05 - 4R Maintenance - Resurfacing~|~553837E8285723E5882E4ED309B8761579BF698B 108644~|~1~|~2~|~02/MPO~|~For work not eligible for urban paving funds. 80% federal MPO-STP funds with a 20% local match provided by the City of Delphos. Funds needed after the cap is reached to be provided by the City of Delphos.~|~04 - Reconstruction - No Added Capacity~|~F66E562F5168797644E0D58D901B619745970056 108644~|~1~|~3~|~03/ENH~|~Construct sidewalk on the east side of South Main Street and a shared use path on the west side from Suthoff Street to the mainline railroad tracks. Construct ADA compliant curb ramps and street lighting. Include sidewalks on the Cleveland Avenue and Suthoff Street sections as well. Federal funds from the Transportation Alternatives Program (TAP) with the non-federal funds in the match provided by the City of Delphos. After the TAP cap is reached MPO-STP funds can be used if available then 100% local funds will be used.~|~28 - Facilities for Pedestrians & Bicycles~|~562223397BF704E3178FEB3A4C03EBE2790311F9 108644~|~1~|~4~|~04/NFP~|~100% local items~|~43 - Utilities~|~BC3921F53110D215BA133D0DA85F8AA5EAFE0E0B 108644~|~1~|~1~|~01/S5K~|~This is for the portion of the project eligible for urban paving. 80% federal funds from the District Preservation Program budget with the 20% provided by the City of Delphos.~|~05 - 4R Maintenance - Resurfacing~|~1A3A6B9760212320E41C7D54737B89525B31E5DF 123842~|~1~|~1~|~01/STR~|~geotech plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6A973DEAF6226E24777A18E21D9E686600BBA919 102955~|~1~|~2~|~02/IMS~|~Bridge Work :Fence installation/repair (062)Deck Sealing (051)Bridge railing upgrade/repair (061)131 - Deck Patching - Concrete~|~13 - Bridge Rehabilitation~|~1FB072A31D962071784A751A8C8A9957C5BEC90B 102955~|~1~|~1~|~01/STR~|~AC Overlay with repairs RIC SR 39 21.944 to 22.822 RIC-SR-39 21.844 to 21.944, RIC-SR-39 20.158 to 21.844RIC-SR-39 22.822 to 27.368~|~05 - 4R Maintenance - Resurfacing~|~E8FAE77914C4DA7D2D9FC4BCFD244136B498536F 95551~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on COL-7; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~15BC3ACDD7E739D0F112B5DC46E8ED973E0CDF6E 106630~|~1~|~1~|~01/NFA~|~The City will reconstruct 700 feet of the two lane East 59th Street between Chester Ave and Euclid Ave.~|~01 - New Construction~|~7AE4A8EEA5A7552E41EC8182C00FFC7D2BDED3C6 101882~|~1~|~1~|~01/BRF~|~SFN 4734653, Ohio Bridge Partnership Program, Crook St over East Branch of Black River~|~10 - Bridge Replacement~|~DF724348ED5BD9EBB770E2D0EEB825BFA70FCFA5 96225~|~1~|~1~|~01/BRO~|~SFN 8706840 bridge over the Maumee River.~|~13 - Bridge Rehabilitation~|~D516B8752FBF9DB6645511E815A581254BBF9C68 96225~|~1~|~2~|~02/STR~|~SR-295 pavement in WOO and LUC.~|~05 - 4R Maintenance - Resurfacing~|~435B8EB1F6F248609D6D280137D24191FC20B551 122983~|~1~|~1~|~01/STR~|~Bridge plan split.~|~04 - Reconstruction - No Added Capacity~|~7AFE62C0B6873CB955411709FF19E975E6A2D040 90569~|~1~|~1~|~01/STR~|~Districtwide pavement marking plan for long line FY13 markings.~|~21 - Safety~|~26A1D5CAFCF428B0D26632CA5CA5166F6C94AE43 116601~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing work and related items on FRA-70.~|~05 - 4R Maintenance - Resurfacing~|~D9D0215149229CDC1F351D9D169CEDCEC086C492 87699~|~1~|~1~|~01/NHS~|~District Allocation~|~47 - Bridge Preventive Maintenance~|~265B5BB791B1C0BAC8F1C380EB54487E31FCAD37 91323~|~1~|~2~|~02/NFA~|~Bridge off Federal system deck overlay over Mud Run. 100% state.~|~13 - Bridge Rehabilitation~|~4AA8D2C6D051FDB0205065E5C4BC4D65A85EE446 91323~|~1~|~1~|~01/NFP~|~General system resurfacing oF SR-100 from SR-309 to Crawford County line~|~05 - 4R Maintenance - Resurfacing~|~CC76F1221820B1937412F3189F518ADEBEBD672A 119029~|~1~|~1~|~01/NHS~|~NHS plan split for structure replacement of FRA-710-3.70.~|~10 - Bridge Replacement~|~A5D02D4F0DBBF6CF9CC864E308F7B622B530656B 119029~|~1~|~2~|~02/S>2~|~Plan split for structure replacement of FRA-605-2.603 & FRA-710-2.059.~|~10 - Bridge Replacement~|~9700227081DB435D7E84FF7A7C018F93CC4BBE07 119029~|~1~|~3~|~03/STR~|~Rural plan split for structure replacement of MRW-95-3.148.~|~10 - Bridge Replacement~|~89019C158BC87D375B7A6BE1FDADB492CB5172B3 100579~|~1~|~1~|~01/STR~|~Crack sealing on various routes in District 11~|~99 - State Preventative Maintenance~|~CE690338DF54AA86546D0976BDC08F7AC6ACE07D 116871~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~CF2D282CBFBECB327B80358461B5EF4B201CA829 97456~|~1~|~1~|~01/IMS~|~An emergency reapir of a slip along I-77.~|~04 - Reconstruction - No Added Capacity~|~5DC2AE50D270AE8BE7DBC39B8DBD6E37CE7BD254 104060~|~1~|~1~|~01/STR~|~Landslide repairs at 2 locations.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E9C55072F2E6AD167EBF9958BC262FE0C51F7019 125726~|~1~|~1~|~01/S50~|~Chip Sealing SR 647 from SLM 1.62 to 2.49~|~05 - 4R Maintenance - Resurfacing~|~CB3B9FEDEBB2CF3D80BC8D14A073F596575CE3CF 125726~|~1~|~2~|~02/STR~|~Resurfacing SR 647 from SLM 2.49 to 8.08~|~05 - 4R Maintenance - Resurfacing~|~60721BA84A31E5D765D27DD06BD1431D39E6A50C 92936~|~1~|~3~|~03/STR~|~For work on a structure at 24.93 in Allen County that meets the state definition of a bridge but not the federal definition. Federal and State funds from the District Preservation Program budget SACs 4PF7 and 4PS7. Rural STP funds. Not elibible for bridge funds.~|~10 - Bridge Replacement~|~05261F1AFA225F63BEF5356FEA4E51B54C32CFB9 92936~|~1~|~2~|~02/NHS~|~For work on a structure at 16.76 in Allen County that meets the state definition of a bridge but not the federal definition. Federal and State funds from the District Preservation Program budget SACs 4PF7 and 4PS7. NHS funds. Not eligible for bridge funds.~|~10 - Bridge Replacement~|~38C691139EF5124E1AD3D4D03A941D07979A936F 92936~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~94A44EC0D9A93F52423F1491E0C5EE4052427369 113281~|~1~|~1~|~01/STR~|~Culvert Replacements.~|~04 - Reconstruction - No Added Capacity~|~7ED7738A78D59E8A3C10236A26E25F702F9FE226 116755~|~1~|~1~|~01/IMS~|~Culvert replacement plan split for DEL-71-9.824~|~44 - Other~|~B6569C8EE481EA495ED9A5805A9B576923B183CF 119656~|~1~|~1~|~01/BRO~|~Replacement of culverts located RIC SR 0314 00.83 & 01.66.~|~04 - Reconstruction - No Added Capacity~|~51AD0C53A938B8313A522D0199579492BA008BF5 96699~|~1~|~1~|~01/NFP~|~MAH SR 11 SB shared 3,000 ton Salt Building with Fence.~|~44 - Other~|~193ACE191DDC3955029B412FB1CA0DD5D4F2032B 120811~|~1~|~1~|~01/STR~|~Traffic Signal and Highway Lighting Maintenance. ~|~21 - Safety~|~2BA70C1AD7BA39EAF6E9A5A0E2CB845B1FBFEB59 88944~|~1~|~1~|~01/BRO~|~Replace existing boxbeam bridge (JEF-150-1098, SFN 4102347) with new structure. The bridge carries SR 150 over Short Creek.~|~10 - Bridge Replacement~|~2ABE101E4CD473F3D575A630192686C69B9A8095 126375~|~1~|~1~|~01/IMS~|~Bridge Replacement~|~10 - Bridge Replacement~|~766D56FFF6301E6AA541572FF6CFBD60670F9A61 124914~|~1~|~1~|~01/S5K~|~Culvert replacement COL-14-4.51.~|~04 - Reconstruction - No Added Capacity~|~1D77F6470F8934464118EC2AF3992EEA2EE653EE 124914~|~1~|~2~|~02/STR~|~Culvert replacement COL-62-4.23.~|~04 - Reconstruction - No Added Capacity~|~B9DF8ED33D5571D7EE4036CDECA7AF0D2965265E 124357~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~D17720994701891089FF311291E0E608871DB067 108090~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridge.~|~13 - Bridge Rehabilitation~|~56CCF49FB253DC4B7E3AFCD3960F243057FC612C 21810~|~1~|~1~|~01/IMS~|~90/10 funding split with federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~44FA22B740564051533D1032EA1C56B12E9D3786 20617~|~1~|~1~|~01/STR~|~Brdg replacement. 2.45 miles west of SR378 4403517 LAW SR243 9.45 Intersect: Leatherwood Creek80 Fed/20 State. 01/STR/BR/State~|~04 - Reconstruction - No Added Capacity~|~EE2437A5DF14BA46386FAE95087D9DFA65F035BB 111988~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2025. Funded 100% State.~|~17 - Construction Engineering~|~17986F6CEBC980D3A21D010D41A05EEE28CE935A 123666~|~1~|~1~|~01/NHS~|~plan split for bridge work on the WAR-42 bridges~|~13 - Bridge Rehabilitation~|~B2D03096DCF7DCDC4448731668292FC988A6371F 126000~|~1~|~1~|~01/S50~|~Split~|~05 - 4R Maintenance - Resurfacing~|~C7677B1F025C29DFDA7EB670C7752CAEE1DE59C5 101015~|~1~|~1~|~01/IMS~|~Repair fascia beam and stiffeners from damage caused by vehicle strike accident.~|~13 - Bridge Rehabilitation~|~15D2A9232D17494B1E51ADA34AC4C9503A26FD90 101675~|~1~|~1~|~01/NFA~|~Mowing D9 4 lanes~|~44 - Other~|~C2EDB07AD26E78D0AB89699CB7F2154551C27424 116845~|~1~|~1~|~01/ENH~|~Adding new sidewalks in Kinsman Township.~|~28 - Facilities for Pedestrians & Bicycles~|~183F2666A39AD77E0E531CA9070264FE61ABEA29 110629~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~99123C80B3DA80A9858F8BFDD16FD840396B001F 110629~|~1~|~2~|~02/STR~|~Bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~1D375D143D8E58B290D45211256DCA7AC75F4715 110629~|~1~|~3~|~03/STR~|~Bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~D3B6E4BFC2A28E4E72E4E9BF0C7C358D2D220988 25617~|~1~|~1~|~01/IMS~|~Split for all bridge work in the interstate system.~|~47 - Bridge Preventive Maintenance~|~46C3264B1CA951477AF411774081943EC76DDF26 111523~|~1~|~2~|~02/ENH~|~Plan Split for 100% LPA-funded lighting~|~28 - Facilities for Pedestrians & Bicycles~|~63E3E4838B5AF135E9EA60827B7DE677838B9977 111523~|~1~|~1~|~01/MPO~|~MPO funded items~|~28 - Facilities for Pedestrians & Bicycles~|~720A09DA77C3C9648E856354CF140AA6417F5473 88927~|~1~|~1~|~01/BRO~|~Remove bridge carrying SR 800 over an abandoned rail road bed.~|~13 - Bridge Rehabilitation~|~DC17BD99E35F70DD277ABA1602BF5CF47C6DE448 92973~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Kno-US 36-00.00 to 10.71; 2) Kno-SR 314-00.00 to 02.73;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6FFDCA451B8AC077B669F68F97A4D80DF9E1F071 95632~|~1~|~1~|~01/ENH~|~Enhance the transit, pedestrian and bicycle facilities along Cedar Road and Lee Road in Cleveland Heights using 80% federal (MPO Enhancement) with 20% local matching funds.~|~28 - Facilities for Pedestrians & Bicycles~|~43C549221A30D516A615D7CC4D162A46E5AD9E1F 95632~|~1~|~2~|~02/NFP~|~Cuyahoga County and Cleveland Hts will participate in the improvement to resurface Lee Road from Dellwood Rd to Superior Ave. Work will also include the upgrade of signs and signals.~|~05 - 4R Maintenance - Resurfacing~|~EB5490D68490D122ED351440FE32F844296CD468 90633~|~1~|~1~|~01/NFP~|~This is a guardrail contract using maintenance operating funds (4CP7).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~515F3D0D110883EBD2CE4417F41193D4F95462AE 116457~|~1~|~1~|~01/ENH~|~Adding sidewalks on Springside Dr from SR 18 to Cleveland Massillon Rd~|~28 - Facilities for Pedestrians & Bicycles~|~E29E73BE86C7B7CB7001BB6E42273116D51421F1 101117~|~1~|~1~|~01/STR~|~DSR# BEL-007~|~04 - Reconstruction - No Added Capacity~|~CC6A2360B5D3267BEB87B2C3772BEEE1FC3F5CA7 113647~|~1~|~6~|~06/IMS~|~Created for J&C Involvement~|~~|~C16F2C1B8D4C2AA5CFCFE75C72116A6D2BB99A39 113647~|~1~|~2~|~02/IMS~|~This plan split will cover all bridge work needed to construct a new overpass of Millikin over I-75 with the new interchange~|~08 - Bridge - New Construction~|~7488EFEAD53E8A14A497D03CE595D94BBD191685 113647~|~1~|~1~|~01/IMS~|~This plan split will cover all pavement and roadway work associated with the construction of the new interchange ramps~|~01 - New Construction~|~BBA19E8C98B2501CA6B89A99EF28512D8F8E9BA0 113647~|~1~|~3~|~03/S>2~|~This plan split is for all work associated with the widening and reconstruction of Millikin Rd from and including the roundabouts at Cincinnati Dayton Rd and Butler Warren Rd. ~|~03 - Reconstruction - Added Capacity~|~6C7D65E4D0752759CE8FC361FE3BACE6EF65686F 113647~|~1~|~5~|~05/IMS~|~This plan split is for 100% local funding for the landscaping for the new interchange. ~|~31 - Landscaping & Other Scenic Beautification~|~1855E34B791F2D13109C8D97EE0B6AB1A6ADF61C 113647~|~1~|~4~|~04/S>2~|~This plan split is for work along Cincinnati Dayton Rd, Butler Warren Rd, the west leg of Millikin Rd and the east leg of Brewer Rd as tie ins to the roundabouts at those intersections. ~|~04 - Reconstruction - No Added Capacity~|~5D404D9B62A66695B05DAED6C807AB61F62810DD 91593~|~1~|~2~|~02/NFP~|~Signal improvements at SR-25 & Newton intersection~|~21 - Safety~|~C74A00CDC7B43F59FAB322D47EE6A0FBEC35269E 91593~|~1~|~1~|~01/SAE~|~Upgrade signals on SR-64 in Bowling Green.~|~21 - Safety~|~FE23052DDA2C6AA656AB298CE77EA7743EB6A06E 82967~|~1~|~1~|~01/IMS~|~Preventative maintenance on the Priority system in FY2015. Routes to be determined.~|~99 - State Preventative Maintenance~|~233EC72A35D61A092513B2A08D5178146C53AB88 88946~|~1~|~1~|~01/BRO~|~Redeck of SFN 0402494, ATB SR45 14.84 OVER MILL CREEK, Ashtabula County, Ohio.~|~10 - Bridge Replacement~|~07AB1418062CF35166F47BC87F0FC6A7B09F2E74 88946~|~1~|~2~|~02/STR~|~Replacement of SFN 0403210, ATB SR84 7.97 over Indian Creek, Ashtabula County, Ohio.~|~10 - Bridge Replacement~|~9222221AEC72248E385FE9EB6CCEB092B2DFBA81 112238~|~1~|~1~|~01/NFP~|~Mowing at various locations in Franklin County~|~44 - Other~|~A1C3B1E10945F2D3FED50DD4A6E958FD69CD426B 117877~|~1~|~1~|~01/NHS~|~Plan split for Urban Paving work on Telegraph Rd / US-24 (NHS)~|~05 - 4R Maintenance - Resurfacing~|~734EEFA5381168BF528D194CECA04E12C463B40F 117877~|~1~|~2~|~02/NHS~|~Plan Split for 100% locally funded pavement repairs, curbs, ramps, etc.~|~05 - 4R Maintenance - Resurfacing~|~384E86069936978DB48B1225A9CCA63A514BCDCA 117877~|~1~|~3~|~03/SAF~|~Safety funding for intersection improvement and shared use path.~|~21 - Safety~|~38C133EEB4404E137DC693B582DF26DEB7747EA3 103437~|~1~|~1~|~01/NHS~|~Pavement split~|~04 - Reconstruction - No Added Capacity~|~A8D1B93AC8C0A3C5AD9822EDA24AF6B06D730052 127106~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~241002BB836B13895EE63E07811166986CC7F913 86001~|~1~|~1~|~01/S>2~|~Federal/State paving on FRA-62: 25.91-25.94, 26.25-26.26, 26.32-26.40, 26.51-26.85~|~05 - 4R Maintenance - Resurfacing~|~6C1E0B3C4D9C290D3BFB0E464703AAA0658EA6D5 86001~|~1~|~2~|~02/S>2/Gah~|~Federal/Local paving in Gahanna on FRA-62-23.83-25.91, 25.94-26.25, 26.26-26.32, 26.40-26.51, 26.85-26.86,~|~05 - 4R Maintenance - Resurfacing~|~F3AEE05C6A91718FB0B1C2781B929D37197CD287 86001~|~1~|~3~|~03/S>2/Gah~|~100% City of Gahanna items for sidewalks, pavement repair, etc~|~05 - 4R Maintenance - Resurfacing~|~5AFC418791F14F5755CCE9C4B8B63ACECCBF93E2 86001~|~1~|~4~|~04/NHS/Gah~|~Paving FRA-62-22.60 to 23.07 and 23.66 to 23.83 (Fed/Local)~|~05 - 4R Maintenance - Resurfacing~|~D69DF3CE10C989CAF16FA3C5A1DED635A27A5968 106144~|~1~|~1~|~01/SAF~|~Guardrail upgrade/repair in District 8~|~21 - Safety~|~93F7E2DC57216E373F3209EEA99D7B0A7001C0DF 106144~|~1~|~2~|~02/SAF~|~Guardrail upgrade/repair in Montgomery County in D7.~|~21 - Safety~|~E499B20046456240088E8F6A81BFFFE6D831AAF0 105653~|~1~|~4~|~04/NFA~|~Repair or replace guardrail sections and/or posts on a Minor Collector that is not on the federal aid system. This is for work on SR 231 in Wyandot County at 10.85, 13.81 and 17.30. Funding is from the District Preservation Program.~|~21 - Safety~|~482F2D99D2C45A4191668979834B62A9606BFFB9 105653~|~1~|~3~|~03/S<2~|~Repair or replace guardrail sections and/or posts on the urban STP system. This is the work on SR 111 in Defiance County and on SR 199 in Wyandot County at 6.93. Funding is from the District Preservation Program.~|~21 - Safety~|~A83A2D28F5D37BCA4F9F65A437B9E015D142C883 105653~|~1~|~2~|~02/STR~|~Repair or replace guardrail sections and/or posts as needed on the rural STP system. This includes all locations on US 127 and SR 281 in Defiance County and all locations on SR 53, SR 67 and SR 103 in Wyandot County as well as the work at 3.83, 9.47 and 22.99 on SR 231 in Wyandot County and 1.3, 8.85 and 10.07 in Wyandot County. Funding is from the District Preservation Program.~|~21 - Safety~|~CE465970DBDA55D8CBD5DE0A106B7D095CCACC0F 105653~|~1~|~1~|~01/NHS~|~Repair or replace guardrail sections and/or posts as needed on the NHS. This includes all locations on US 30 in Van Wert County and all locations on US 23 in Wyandot County. Funding is from the District Preservation Program.~|~21 - Safety~|~98EA7B9EE8B4A8E77682C404C6142CECAB38432F 104101~|~1~|~1~|~01/STR~|~Plan split for bridge replacement~|~10 - Bridge Replacement~|~4235CD16E781FA63D412157A0A65246B7997F2DD 121505~|~1~|~1~|~01/SAF~|~Signal & lighting maintenance~|~21 - Safety~|~B3CB9140C9A6C1405D4E396824A4C68541D1AE83 121533~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~902A7C558409660B33F60B5CB67986CA1B4C1C03 121533~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~C9AF53C51CEE67E54C3F18F30B11E62AEC1ECA43 121533~|~1~|~3~|~03/NFP~|~Bridge hit repairs via change order.~|~13 - Bridge Rehabilitation~|~25F546BF369FFA923133C594A8012B6C5602AEE2 91810~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6003842 MUS SR83 1.38 Intersect: Csx Rr N. Crooked Crk #; BR Eligible for Rehabilitation: Length=291 SD/FO(1) SR=76.5 DSR=4~|~13 - Bridge Rehabilitation~|~E0CC41DA754FC7B9301C47FC55A004D4D5E4D157 118202~|~1~|~1~|~01/SAF~|~Plan split for Safety funds~|~21 - Safety~|~80070F0D1565591ADCF69A608C999A80490F8A65 87715~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~3FDB804D1E6156149F67B668256E9ED800DCD038 16319~|~1~|~2~|~02/MPO~|~100% Local items.~|~03 - Reconstruction - Added Capacity~|~153E0609DE3663D556E3D3E3072F1DC7EA1573BB 16319~|~1~|~3~|~03/SAF~|~Added plan split for 90/10 Safety items.~|~03 - Reconstruction - Added Capacity~|~DA5E505A1FBEF30662D59BD0C2B053EC0F0BE659 16319~|~1~|~1~|~01/MPO~|~Major reconstruction~|~03 - Reconstruction - Added Capacity~|~FAD205B66D6F138E1F65D049ED5D1ABFF989EB4F 124552~|~1~|~1~|~01/NHS~|~KY Share (73%) of total cost of bridge rehab project ~|~13 - Bridge Rehabilitation~|~1EE84E71AAF5662554959B24A0D6B47973BA8732 124552~|~2~|~2~|~02/NHS~|~OH Share (27%) of KY bridge rehab project.~|~13 - Bridge Rehabilitation~|~57793AF1AF2847DEB09AE836F62AE3D4E64E9F8D 87935~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of SR 310 south of the Limited Access area: Lic-SR 310-00.74 to 00.86~|~04 - Reconstruction - No Added Capacity~|~13B15AED86B6E9E1FD09CF406A664546F38312EF 87935~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP. Replacement of SR 310 north of the Limited Access area Lic-SR 310-01.19 to 01.44~|~04 - Reconstruction - No Added Capacity~|~2EEF0E032E68D1C46AEFB8C3B5C54137024AE028 87935~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation/MORPC 4PF7/4TA7 (80% Federal) / 4PS7(20% State) - CAP on MORPC (4TA7) Funding $2,650,000.00 for Bridge Construction - Rehabilitation on SFN 4505646 LIC SR310 0.96 Intersect: Sr 310 Over Ir70; BR Eligible for Rehabilitation: Length=284 SD/FO(1) SR=77.3 DSR=4~|~13 - Bridge Rehabilitation~|~61F2C58D97B20CDE0882CC1C15FA5C8CF6679829 87935~|~1~|~5~|~05/NHS~|~"05/NHS/CV/ " - District Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP. Replacement of deficient culvert at Lic- SR 310-01.34;~|~04 - Reconstruction - No Added Capacity~|~C2888EA9CFC37A4AD6AE7767452C5F7C563BFFE7 87935~|~2~|~8~|~08/STR~|~"08/STR/PV/ " - District Preservation 4PF7 (80% Federal)/4PS7 (20% State) - No CAP -Resurfacing of 1)Fai-SR 310-0.00 to 0.52 and 2)Lic-SR 310-0.00 to 0.96~|~05 - 4R Maintenance - Resurfacing~|~85BD18378B61294920F09B52821E5F0F5E46B51C 87935~|~2~|~9~|~09/NHS~|~"09/NHS/PV/ " - District Preservation 4PF7 (80% Federal)/4PS7 (20% State) - No CAP - Reurfacing of Lic-310-(0.96 to1.71)~|~05 - 4R Maintenance - Resurfacing~|~D04A286E8FB1D15CC3201F590882B452B7A1A2F9 87935~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation/MORPC Funding 4PF7 / 4TA7/MR06 (80% Federal) / 4PS7 (20% State) - CAP MORPC $4,022,112.25 Federal Funding. Replacement of: 1) Ramp RA-45006; 2) Ramp RA-45003; 3) Ramp RA-45004; 4) Ramp RA-45007; and widening of SR 310 within the Limited Access area: 5) Lic-SR 310-0.86 to 01.19;~|~04 - Reconstruction - No Added Capacity~|~FA4B3D4F19F817FCE139FE401DD01D956476D57C 87935~|~1~|~6~|~06/IMS/ETNA~|~"06/IMS/OT/ETNA" - Local Funding MORPC 4TA7/MR06 (80% Federal) / Etna 4BG7 (20% Local) - CAP of MORPC Federal Funds $472,783.75. Township Name and Lighting Aestects on the SR 310 bridge over IR 70.~|~13 - Bridge Rehabilitation~|~F2FC7A7C456EB20B2FC8AA7D7CE6F4C8C734B6AA 87935~|~1~|~7~|~07/NHS/SWLC~|~"07/NHS/OT/SWLC" - South West Licking County Water & Sewer Funded - 4BG7 (100% Local) - No CAP - Installation of South West Licking County Water & Sewer lines~|~44 - Other~|~68300B02A0AF54CC52753C5957FB2175129CD7E2 11455~|~1~|~1~|~01/STR~|~8602646 WIL SR191 5.34 Intersect: Tiffin River~|~~|~BAE380126767CC188D968806808AD23D0E409D6D 103272~|~1~|~1~|~01/IMS~|~Truck Parking Information Management System along IR 70/75/71 -Us 33~|~21 - Safety~|~1F8F59937CB7DC81942835850E25FB069071E363 103272~|~1~|~2~|~02/IMS~|~Plan split for Operations and Maintenance.~|~21 - Safety~|~805F33388D877AA5198B1105A77601EBCA815DD4 103272~|~1~|~3~|~03/IMS~|~TPIMS additional set of rest areas on IR 70 in Belmont County.~|~~|~B372E32CE0A21800314A317FDB273C267EBDC895 111402~|~1~|~1~|~01/STR~|~Culvert liner project on HOC 56 17.47, CFN 1824547. Rural other federal aid funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~57F71DFBCDC939F4574A8C74159090C00B951003 99601~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B8D0D79414A998B8A2D117DBAF28F149B88E3F58 112661~|~1~|~1~|~01/MPO/NILE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~900046DE2626A6C5D84E9CC97C34BB89C1337F54 25025~|~1~|~1~|~01/S<2~|~Resurface the existing roadway and other roadway related items Celina on SR 197 0.26 to 1.59 from the junction of US 127 to the Celina Corporation Limit~|~05 - 4R Maintenance - Resurfacing~|~DF5B9ABC32A64DD1A6690AC0819E2B0F5FD6189F 101965~|~1~|~1~|~01/STR~|~Apply herbicides along the roadside for weed control on 4 lanes.~|~44 - Other~|~031A2B9FD9A96208F8B222E22834E6009E3ABECE 93114~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~4163977F07D1E6450D867EE133B65E7116917B1F 120506~|~1~|~1~|~01/STR~|~Bridge replacement~|~13 - Bridge Rehabilitation~|~D4C924FF7C31E33E7F391A4BA1F737AB6176ED7A 114533~|~1~|~1~|~01/NFP~|~D09 Deck Sealing Project FY2027~|~47 - Bridge Preventive Maintenance~|~6C7ABC1A3C9F5A9B4D7221EEE67D1CB15F13BA2C 106090~|~1~|~2~|~02/NHS~|~NHS Plan Split: DEL-37-10.48-11.45~|~05 - 4R Maintenance - Resurfacing~|~17E0E931E22532F05B124D9B0B0741754D8A6746 106090~|~1~|~3~|~03/S>2~|~100% City of Delaware items~|~05 - 4R Maintenance - Resurfacing~|~A1251E97649B7C5ED4F53902699A7E2431D00044 106090~|~1~|~4~|~04/NHS~|~Drainage repair on US 23 and repair at SR 37/Section Line Rd to be paid 100% by the state~|~05 - 4R Maintenance - Resurfacing~|~11570B47840F57642F393DC5487B5FDD871A0917 106090~|~1~|~1~|~01/S>2/COD~|~Urban Paving Plan Split: DEL-37-9.07-10.48~|~05 - 4R Maintenance - Resurfacing~|~07D4D52316265CC0D020256B6CC60C590D0262D5 112108~|~1~|~1~|~01/NFP~|~Electrical maintenance contract~|~44 - Other~|~636A935317715ADB31F1BC65DFD24512F8FBC4C3 105549~|~1~|~1~|~01/NHS~|~Double Application Microsurfacing~|~~|~195C8E957EE5CE9E878C7B581C034602C9BCC6C7 105549~|~1~|~2~|~02/IMS~|~Interstate Plan Split: MRW-71-0.00-12.20~|~~|~C42D855B1F7F1170E2BF419425AAD9CB36E33AA9 81700~|~1~|~1~|~01/BRO~|~Replace existing structure (HOL-62-1738, SFN 3801357) with a new four-sided precast concrete box.~|~04 - Reconstruction - No Added Capacity~|~56567502E5E2358AD58DDB55E2E4C929F2BA7491 109723~|~1~|~1~|~01/NHS~|~Resurface the existing roadway with Fine Polymer Asphalt (Smoothseal) ? (1.00?)~|~05 - 4R Maintenance - Resurfacing~|~92659962874495EA684CA741A04A772AFDB1E3BD 109723~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0E981744CF52CD5C05D2457CB05DC30F53DD367B 100306~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to MAH SR 46 14.67 to 16.87~|~05 - 4R Maintenance - Resurfacing~|~0A30DE499F8E35BA60629A665C8B70877EAEB41D 100306~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to MAH SR 46 12.04 to 14.67.~|~05 - 4R Maintenance - Resurfacing~|~5ACFEF774E5E58A24BA0EDA2C5CE6CE45474433D 100306~|~1~|~3~|~03/STR~|~Fine graded polymer AC Overlay to MAH SR 45 11.77 to 14.15.~|~05 - 4R Maintenance - Resurfacing~|~5625436FF31A0EB52E0766A1DA1BE3F8D97E406C 105580~|~1~|~1~|~01/STR~|~All work in this project.~|~04 - Reconstruction - No Added Capacity~|~7659F011940962CF1D4D61688CD08AF7FA497E35 108818~|~1~|~1~|~01/NFP~|~Replacing the linked culverts.~|~~|~1F5C3095762EF0E3F33D48E4307C6650F1EA3394 107971~|~1~|~1~|~01/S<2~|~Perform concrete pavement repairs at the ramp CLA SR 41 SLM 12.17 to 12.37~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A3CB38544E5AABB5687839899C1A238BE955D53 107971~|~1~|~2~|~02/STR~|~Repair settlement and pavement approaches to BR # CLA-54-0567.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DC72CEBD50FCB23F1914410FC553CE528B16CCA3 93113~|~1~|~6~|~06/IMS~|~Bridge WorkMED-57-3.24 (over I-76) / MED-57-9.00 (over I-71) / MED-94-14.55 (over I-271)~|~13 - Bridge Rehabilitation~|~0F9C2CC2B1682C9F4FA6F0944FD7314053E46CA7 93113~|~1~|~5~|~05/STR~|~Bridge WorkMED-51-5.21 / MED-57-5.72 / MED-57-6.51 / MED-94-11.38 / MED-94-11.91 / MED-94-12.22 / MED-94-13.14~|~13 - Bridge Rehabilitation~|~115C74B42199D505C7646E652BC2BB1A6D7E7124 93113~|~1~|~2~|~02/S<2~|~District Allocation - Urbanized Area~|~05 - 4R Maintenance - Resurfacing~|~233AEB416A04958C7C01A290EAF2A17FE3BD9EE2 93113~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~90AD88586A9EA159743276A60376F854694B3907 93113~|~1~|~3~|~03/S<2/WADS~|~Federal (4PF7) / City (4BG7) - Wadsworth split corp MED-057-3.24 - 03.44 / MED-057-03.58 - 03.84~|~05 - 4R Maintenance - Resurfacing~|~BD08806B17664EE0857740D3CE3725D02F84C31F 93113~|~1~|~4~|~04/S<2/WADS~|~100% City of Wadsworth~|~05 - 4R Maintenance - Resurfacing~|~DC1FCBFEDE9C2D314276ED61C1E625CAB2D90A1A 121871~|~1~|~1~|~01/S5K~|~REHAB OF CONDUIT~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F097DCA53F9F2A58D4D9921B73A1D97CA2EB0AED 99456~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall.~|~04 - Reconstruction - No Added Capacity~|~B6A31F9A564FD463D8E34BC76C4105025A56804E 114736~|~1~|~1~|~01/SAF~|~Intersection improvements at MAH SR 7 and Brookwood Rd.~|~21 - Safety~|~43986A1BDBBF03F1F2961209E160288674AAA5ED 114736~|~1~|~2~|~02/S>2~|~Culvert work.~|~04 - Reconstruction - No Added Capacity~|~DF2370249A86F7894CBC023F3C77EC1747C78308 110512~|~1~|~1~|~01/BRO~|~Bridge Funding Plan Split - Woo-75-28.78~|~13 - Bridge Rehabilitation~|~07C09E36063F2B805B4CA8B0E0F99E6B8721EE90 119095~|~1~|~1~|~01/NFA~|~VIN-50-0.00-10.68 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FBEB2B3E90422C41CB11C9A306AEAB4137363547 95439~|~1~|~1~|~01/NFA~|~Perrysville Outpost - Salt and Storage Buildings - Facilities Funds~|~44 - Other~|~925C1F400FFF81F2A4A4BAF0396A787493A32419 105261~|~1~|~1~|~01/NFA~|~Resurfacing of CAR-524 and JEF-524~|~05 - 4R Maintenance - Resurfacing~|~BD9E91F9C3BA28E1838417C9414EA1A156EA80C3 105261~|~1~|~2~|~02/STR~|~Resurfacing COL-45 from SLM 0.89 to 8.95~|~05 - 4R Maintenance - Resurfacing~|~FD26BA73DD3F2F4F183FA61C33810EEBA2BE8D94 109709~|~1~|~1~|~01/STR~|~Ac overlay~|~05 - 4R Maintenance - Resurfacing~|~AC95E3FFB7E36EDE11B7DF8814EFA6A00BE6CDB0 109709~|~1~|~2~|~02/IMS~|~AC overlay with repairs.~|~05 - 4R Maintenance - Resurfacing~|~FBC3E0738EB17003B7FBCC4EF7BFAE12779DBF3A 98592~|~1~|~1~|~01/SAF~|~Intersection improvement/signal upgrade project. VIN 50 17.44-17.47 and VIN 93 8.05-8.16. Work includes new signal, left turn lanes, radii improvement and changes to parking. Funded 90 federal/10 state.~|~21 - Safety~|~0F4BF0732E82BC1B083C899FC230769446A01D1F 103279~|~1~|~1~|~01/S>2~|~Replace failed retaining wall along US 50.~|~04 - Reconstruction - No Added Capacity~|~56DF6BA4A1CC83521196F5C94CA9651D06903771 92907~|~1~|~1~|~01/IMS~|~8703183 WOO IR75 6.01 Intersect: Tr 23-Jerry City Road 8703213 WOO IR75 6.01 Intersect: Tr 23-Jerry City Road~|~~|~A3BE01EC758BAB55B92D76380A6D70A1EA84976D 105498~|~1~|~1~|~01/IMS~|~Deck replacement for Gantz Rd over IR 270 (existing width 62%) and McComb Rd over IR 270 (full width) including 100% of guardrail to Charlemagne St.~|~13 - Bridge Rehabilitation~|~F40FA7FC4036AD9E34EE39861720979E66C269F8 105498~|~1~|~3~|~03/IMS/GrC~|~Construct shared use path along Gantz Rd from Home Rd to the bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~87BB7872E97AABB73038D3898B14CCC469D1609D 105498~|~1~|~2~|~02/IMS/Cols~|~Widen Gantz Rd bridge to accomodate a shared use path (widened width 38%)~|~13 - Bridge Rehabilitation~|~9A834496DAF6E9A963A1D93897CF1982FD6D853A 105498~|~1~|~4~|~04/S>2/Cols~|~Grade the shoulder slopes along McComb Rd. to accommodate a future sidewalk from the bridge to Charlemangne St. Construct shared use path along Gantz Rd from the bridge to Collier Crest. Widen and resurface McComb Rd. from Home Rd to the bridge. All funded 100% by Columbus~|~28 - Facilities for Pedestrians & Bicycles~|~9D288EA590862309300E0908DDF8DF426713DD1D 94113~|~1~|~1~|~01/BRF~|~Replace deficient bridge carrying Fairfax Avenue over Lilly Creek with minimal approach work (single span, SFN $5770696 (0.2 miles South of Springfield Street.~|~13 - Bridge Rehabilitation~|~29BC06970ADCE5407F63A2E41D4699E94678977C 122138~|~1~|~1~|~01/NFP/BARB~|~Install new sidewalks in gap locations.~|~28 - Facilities for Pedestrians & Bicycles~|~59DC285A59B3C52366AC4906B4F20036DE3388E3 118710~|~1~|~1~|~01/IMS~|~Plan split for work to rehab bridge HAM-71-0091.~|~13 - Bridge Rehabilitation~|~E17AB61F96A43BABE38091E2682861E9651E2CE0 120357~|~1~|~1~|~01/NFP~|~Systematic sign upgrades/replacements on various routes throughout District 4.~|~21 - Safety~|~6977518823669F2CF5297A65347EDB4F0AA5D89F 87973~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of: 1) 3005194 GUE SR285 4.56 Intersect: Over Infirmary Run; Not BR Eligible for Rehabilitation: Length=86 SD/FO(0) SR=75.7 DSR=5:~|~13 - Bridge Rehabilitation~|~16B55CD3E8949D9DE7F22AD2C799BF2AD677B42C 87973~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of: 1) 3005070 GUE SR285 0.15 Intersect: Over Seneca Fork Wills Ck; BR Eligible for Rehabilitation: Length=133 SD/FO(1) SR=65.2 DSR=4;~|~13 - Bridge Rehabilitation~|~CB9E4B1E8043DDAF970B27094A87E6DBA41C769B 90222~|~1~|~2~|~02/BRO~|~80/20 fed/state funding split using federal BRF funds for structure 2802317; GEA-608-1053.~|~10 - Bridge Replacement~|~01B95C3789A21462E9AE3DAC0D9BBEBCC06A801E 90222~|~1~|~1~|~01/STR~|~80/20 fed/state funding split using federal STP funds for structure 2800993; GEA-088-0496.~|~10 - Bridge Replacement~|~D6BE222700EFA88869492C32F07D30735B1B1385 116717~|~1~|~1~|~01/STR~|~Culvert Liner Project WAS 339 7.32 CFN: 1809792~|~04 - Reconstruction - No Added Capacity~|~6FCD34EE80A0049D25F70B41B056A975D63BFC69 119822~|~1~|~1~|~01/NHS~|~Construct sidewalks~|~21 - Safety~|~2BD61A46C1AE261DCDA8992A11960A9F2CAB7B2A 119822~|~2~|~2~|~02/NHS~|~Decorative Lighting~|~31 - Landscaping & Other Scenic Beautification~|~FF5BA8A6C1026AEA6476A61D61A4CB58DD3FBEE4 116695~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~5D4B82764079E11CCB77382644C16662B6AF6F4D 116695~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~FC811E14ADD0DF7E0BD13B5CEE830F2662404767 108071~|~1~|~1~|~01/IMS~|~All items associated with pavement repairs on I-70 and US-42.~|~05 - 4R Maintenance - Resurfacing~|~4619CE8FE09425ABC19F8624C7778C70B16A4F99 119958~|~1~|~1~|~01/CMQ~|~Widen Beaver Valley Road from Dayton-Xenia to Hazel Drive. also includes curb, storm sewer, lowering portion of roadway and installation of sidewalk.~|~03 - Reconstruction - Added Capacity~|~17CC96041B4A27E9FA7CBAAC1A620483ED3088AD 119934~|~1~|~1~|~01/SAF~|~Safety Items~|~28 - Facilities for Pedestrians & Bicycles~|~3645D0F9A92748AAF1DD6A83169054C17FE6838E 84576~|~1~|~4~|~04/NHS~|~Rehabiltate bridge size culvert CLE-52-0956 (10' CIP box culvert): SFN 1301683 and intersect: Opossum Hollow. Work to be performed: slope protection, sealing, & scour prev. & repair~|~13 - Bridge Rehabilitation~|~28CE34DBB2E6E4D08458D4F4BC601F8D1BC26641 84576~|~1~|~1~|~01/NHS~|~Rehabiltate bridge size culvert CLE-52-0921 (108" CIP box culvert).~|~13 - Bridge Rehabilitation~|~4BC565AA45DDB78538B8D2498ABC594DCAC0B110 84576~|~1~|~3~|~03/NHS~|~Rehabilitate bridge CLE-52-1336 (30' boxbeam). SFN: 1301802 and intersect: Ray Run. Work to be perfomed includes: slope protection, concrete patching, sealing, & scour prev. & repair.~|~13 - Bridge Rehabilitation~|~4D273ABCC889DBB2496E97E5D1DF5D5964194A82 84576~|~1~|~2~|~02/STR~|~Rehabilitate Bridge CLE-232-0048 (120" CMP). SFN 1304356 and intersect: Dry Run. Work to be performed: drainage system cleaned, scour prevent/correction, channel clean out, slope repair, & invert repair~|~04 - Reconstruction - No Added Capacity~|~574DD25FEE28EB479ED433F375E1A1A19BEA55FA 84518~|~1~|~3~|~03/S<2~|~District Allocation - Roadway Items plus structuresASD-042-09.02 sfn:0301299~|~05 - 4R Maintenance - Resurfacing~|~4959E6A2B7E75F0E7779159D7375B6A2792E3CA0 84518~|~1~|~4~|~04/NHS~|~Resurfacing - 80/20 - District Allocation/City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~5219050AB1A03CD574D258A71CB3006882A669CA 84518~|~1~|~2~|~02/NHS~|~District Allocation - Roadway Items plus structuresASD-042-05.93 sfn:0301108ASD-042-06.53 sfn:0301140ASD-042-07.76 sfn:0301183ASD-042-07.91 sfn:0301205ASD-042-08.89 sfn:0301280~|~05 - 4R Maintenance - Resurfacing~|~54BE98DC1EAC11A15739B78414A5CEDBEAADEC12 84518~|~1~|~7~|~07/S<2~|~Bridge Work ASD-042-09.39 sfn:0301329~|~13 - Bridge Rehabilitation~|~6D82BBA137728BCCC408F31E8E0894BF8ED26053 84518~|~1~|~5~|~05/S<2~|~Resurfacing - 80/20 - District Allocation/City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~788717B9F00A792D0FC30E52B5F8E9037D98DFAE 84518~|~1~|~6~|~06/NHS~|~Bridge Work ASD-042-08.45 sfn:0301264~|~13 - Bridge Rehabilitation~|~D5D9D7F5BF4A2D2A09952F5FE87C2FBC9548AC35 84518~|~1~|~1~|~01/S<2~|~100% City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~EE727A556D5297083BFA1A9BF689C626ADFDB84E 95384~|~1~|~1~|~01/BRF~|~Preservation of a historic bridge relocated from TR-150 nder PID 90412 to the Hueston Woods State Park. Rehabilitation includes additional steel work at the gussets, vertical members, and lower chord, application of a new protective coating system, installation at new location on new concrete abutments with new stringers and a timber deck.~|~~|~D995478F3D552F118FBC8363F7CC12B746567697 86288~|~1~|~2~|~02/NHS~|~Pavement planing and resurfacing with asphalt concrete, along with other roadway related items on DAR SR 49 SLM 17.35 to 17.64.~|~05 - 4R Maintenance - Resurfacing~|~FD55BA28675606A8D87D5CCA47E1ABDE05FEE7AA 86288~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete along with other roadway related items on DAR SR 118 SLM 0.56 to 1.90.~|~05 - 4R Maintenance - Resurfacing~|~65480DD1034380E059CA4978913A371BE9323C54 115856~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2029.~|~21 - Safety~|~771C561D70AED3DABBDE9ABB84BD3A7E3AB68941 125676~|~1~|~1~|~01/IMS~|~Plan split for resurfacing I-71.~|~05 - 4R Maintenance - Resurfacing~|~055A646FF33D8F5D4D33D2A7D6490D19FAD5A342 127078~|~1~|~1~|~01/NFP~|~Plan split for annual lighting repair and maintenance contract on the interstate system~|~21 - Safety~|~5CDE3C13B464D4D39A844DDBB956850AD8A80761 121160~|~1~|~1~|~01/NFA~|~Created Plan Split for J&C Involvement. ~|~44 - Other~|~4CBD874455033D1405F03FB3B2C181738EC62A31 97851~|~1~|~3~|~03/BRF~|~Replace MRW-TR 110-1.52 (Cardington Williamsport Rd) structure over Kokosing River SFN5932548~|~10 - Bridge Replacement~|~364A8428971DC7CCA30741EF643D4A68C5942E7A 97851~|~1~|~1~|~01/BRF~|~Replace MRW-CR 109-0.86 (Pulaskiville Rd) structure over Kokosing River SFN 5932769.~|~10 - Bridge Replacement~|~B740046AE127BFFEBEE932EAE7D467E792DBD101 97851~|~1~|~4~|~04/BRF~|~Replace MRW-TR 121-2.39 (Center Corners-Fredericktown Rd) structure over Kokosing River SFN 5931290~|~10 - Bridge Replacement~|~95AEE233B52088D6B75F435430F37144DC570AFF 97851~|~1~|~2~|~02/BRF~|~Replace MRW-CR 20-2.40 (Williamsport-Bloomingrove Rd) structure over Kokosing River SFN 5933005~|~10 - Bridge Replacement~|~1B6F46A466B0867AC55CF84E254A5357E3029932 89095~|~1~|~1~|~01/BRO/MCEO~|~"01/BR0/BR/MCEO" - County Engineer's Association Organization (CEAO) Bridge Funding 4B87 (80% Federal) / 4BG7 (20% Local Match) - CAP 4B87 = $3,552,800 minus $1,000,000 for RW = $2,552,800.00 / 4BG7 - $410,000.00 - Replacement of Deficient Bridge Mus-SR 555-10.19 carrying SR 555 over Jonathan Creek. BR Eligible for replacement; L=222?; SD/FO = (1); SR = 3.0; DSR=7~|~10 - Bridge Replacement~|~A63512B0F385639A1BC607CB17A49C605CE1FDF8 89095~|~1~|~2~|~02/S<2/MCEO~|~"02/S<2/PV/ " - County Engineer's Association Organization (CEAO) Bridge Funding 4B87 (80% Federal) / 4PS7 (20% State Match) - CAP Remaining from Plan Split 1 4B87 = $3,552,800 minus $1,000,000 for RW = $2,552,800.00 - Realignment of SR 555 to align with new bridge; Mus-SR 555-10.19 to 10.45~|~10 - Bridge Replacement~|~C5FA87EF5520904132AF6A6C8C3AF2ED6EB563C2 124717~|~1~|~1~|~01/NFA~|~Bridge rehab project on GAL TR 420 0.00, SFN 2742330.~|~13 - Bridge Rehabilitation~|~C4984801C8BD32795DDE99648023A6DDD29B9515 108723~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-033~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~86ACC5998C3AD5A0C718FF3F98854DB954DD6D9D 94563~|~1~|~1~|~01/IMS~|~90% federal / 10% state funding split using noise wall funding.~|~44 - Other~|~7F4324C74110FD3107AA990DFDA7271F2ACCC2AA 94563~|~1~|~2~|~02/NFP~|~100% state funding for 48" culvert purchase.~|~44 - Other~|~ED4355F4F6FCC4BEE79B3E97DC780BD6D06B7837 102452~|~1~|~1~|~01/STR~|~Herbicidal Spraying for CAR, COL, HOL and TUS~|~44 - Other~|~B2DBCFAB3A4EBC6BD5E725622C915CD3FC0AAF7C 114261~|~1~|~1~|~01/MPO/HAM~|~Construct a 10-foot wide multi-use path along the backside of the Great Miami River levee between Main Street and Black Street. Route generally follows the abandoned Hamilton Beltline rail corridor and is approximately 0.65 miles in length.~|~28 - Facilities for Pedestrians & Bicycles~|~952F148FAF8DAF659A42C1BF5959C9724F8FE230 107171~|~1~|~1~|~01/STR~|~Rural Plan split~|~05 - 4R Maintenance - Resurfacing~|~B034B1ABF0AFA616DD1285D88A3E6F6D4B10E514 107171~|~1~|~2~|~02/S<2~|~Added Urban Plan Split~|~05 - 4R Maintenance - Resurfacing~|~729979D35A3FF594298F813E3A5C401140EDA5E3 121522~|~1~|~1~|~01/IMS~|~Slope stabilization along the ramp from Mitchell to HAM-75~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1512648E71240A8EE06283358EA8E14EFDBD5153 103196~|~1~|~1~|~01/IMS~|~Split for work on the interstate system~|~99 - State Preventative Maintenance~|~BF49E4F93BE026CFBF13B028CA47FE00B87D33B0 103196~|~1~|~2~|~02/NHS~|~Plan split for work on NHS routes~|~99 - State Preventative Maintenance~|~1C6DDA7F1E3B0743ACBCBDD796F440172005B7AB 103196~|~1~|~3~|~03/S>2~|~Plan split for work on urban STP routes~|~99 - State Preventative Maintenance~|~77F709A8423A8C7B7EB9D6F9C477F53F6A208F7C 103196~|~1~|~4~|~04/STR~|~Plan split for work on the rural STP routes~|~99 - State Preventative Maintenance~|~1A2B1FC4A6F5C9C8A27E9F5285D4F84E1BF14AB7 100379~|~1~|~1~|~01/STR~|~All work is in this Plan Split. All funds are from the District Preservation Program budget. No local funds. 80% federal SAC 4PF7 and 20% state funds SAC 4PS7. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~51D8E11556E286AE0C006735BEED9D917E4F16A7 119258~|~1~|~1~|~01/S5K~|~All items of work associated with resurfacing of SR 188~|~05 - 4R Maintenance - Resurfacing~|~15950146106F8A4EE68BDA32A0844C0830DECF81 119258~|~1~|~2~|~02/NHS~|~All items of work associated with resurfacing of US 35~|~05 - 4R Maintenance - Resurfacing~|~E81757D34F9F6EAA7D18FF6C376A366599B8C174 117124~|~1~|~1~|~01/IMS~|~Landslide repair along southbound HAM-75 near SLM 5.53~|~04 - Reconstruction - No Added Capacity~|~37A3A679E5F9DF35701C9098B085D2B38337210C 102807~|~1~|~1~|~01/NHS~|~For work on US 24 which is on the NHS. All funds from the District Preservation Program budget. Federal SAC 4PS7 and State SAC 4PS7. No local funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~737F7F64AF7536945D7F19CC9EB70A817E5A41D4 95520~|~1~|~2~|~02/NFA~|~Reapir/replace existing culvert DAR 705 1.77~|~04 - Reconstruction - No Added Capacity~|~274577D61CE8291660718ADE1174BFF60F8F2254 95520~|~1~|~1~|~01/STR~|~Repair/replace existing culverts at DAR 705 8.50, DAR 705 13.90, MER 49 1.71, MER 49 10.26 and SHE 705 0.72~|~04 - Reconstruction - No Added Capacity~|~5F6F5E028F9A18FA630757F9675A739B3F0B08E2 106262~|~1~|~1~|~01/S<2/COC~|~Urban Paving Plan Split: PIC-22-18.26-18.88 PIC-56-19.57-20.66~|~05 - 4R Maintenance - Resurfacing~|~BE6653CEC6C78C248323763A99348C067B5EA933 106262~|~1~|~3~|~03/S5K~|~This plan split is associated with 100% CIty of Circleville cost items - such as pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~CFDF167F40ECDDFD9BBF8148ADB12F356544BE0C 106262~|~1~|~2~|~02/STR~|~Rural plan split for the geotech work and pavement rebuild (SLM 15.47 to 15.51)~|~05 - 4R Maintenance - Resurfacing~|~E5DD1A4671DF4D7133976BACB329D65F4888B3C2 103012~|~1~|~1~|~01/IMS~|~Installing 0.2 mile markers on ATB IR90.~|~~|~8CBED8124B17CFEDA3E2AB1EDFDEFD05019C3621 97781~|~1~|~1~|~01/NFP~|~100% State Task Order Construction Porject Inspection~|~17 - Construction Engineering~|~F2488E80F550EEB28D2386B8C80D1B10FD7EB896 103735~|~1~|~1~|~01/NFA~|~Safe Routes to School~|~28 - Facilities for Pedestrians & Bicycles~|~FEF9D656B938CC5D5B596108941F69B588F3974E 113808~|~1~|~1~|~01/BRF~|~Replacement of SFN 3946088~|~10 - Bridge Replacement~|~82E63BB003A7380E0B4A2D6431FBE3BEDC636D13 93299~|~1~|~1~|~01/S<2~|~General system paving and in urban func class areaPIC-188: 1.44-1.68, 2.57-2.90~|~05 - 4R Maintenance - Resurfacing~|~30D9BAD914226BEBC0B986B6B8937CB2C2D9AA64 93299~|~1~|~3~|~03/STR~|~General system paving and in rural func class areaPCI-188: 2.90-8.03~|~05 - 4R Maintenance - Resurfacing~|~58FB5EBBD332C926B7C48A41E8D221B36BB718CD 93299~|~1~|~2~|~02/S<2~|~Circleville urban paving and in urban func class areaPIC-188: 1.68-2.57~|~05 - 4R Maintenance - Resurfacing~|~79AE4C11836411BD1E7591397ED88C71399BE584 79390~|~1~|~1~|~01/NHS~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the NHS portion on SR 4 between SLM 22.34-23.23 (Nelbar - North Corp.). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~2ADA4FBB58C3FC91BBF3E33B7DDCEF66ADC3E83C 79390~|~1~|~4~|~04/S<2~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the STP<200000 area on SR 122D between SLM 1.4-1.85 (Tytus Ave. - Carmody). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~17 - Construction Engineering~|~6966A806C41BEEB838882909DFF3BD68C50ADF65 79390~|~1~|~3~|~03/S<2~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the STP<200000 area on SR 122D between SLM 1.4-1.85 (Tytus Ave. - Carmody). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~8166CC96FAD5FBAD26144389EF0DE7AEC76C92C8 79390~|~1~|~2~|~02/NHS~|~FY2014 Urban Paving Project in the City of Middletown. This Plan Split is for the NHS portion on SR 4 between SLM 22.34-23.23 (Nelbar - North Corp.). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~AE0430CC78B51BD4021CEAC4D3E18631F961E666 115842~|~1~|~1~|~01/STR~|~Culvert replacement project.~|~04 - Reconstruction - No Added Capacity~|~0B89F3F256252F0A33A86C3ABFF95A60D98FC53A 123496~|~1~|~1~|~01/STR~|~Resurfacing project using a fine graded polymer treatment.~|~05 - 4R Maintenance - Resurfacing~|~D58138D981B4D02E14622BD8F1B5C1C3857FE450 123496~|~1~|~2~|~02/S5K~|~Resurfacing project using a fine graded polymer treatment.~|~~|~E591EC6170A4134791A6103EE5EDD738997C5015 100049~|~1~|~1~|~01/STR~|~Realignment of SR 43 in the Village of Amsterdam~|~21 - Safety~|~3AF39BB17073253AC48135C2A90D0A7D49F63569 100049~|~1~|~2~|~02/STR~|~This plan split is for the construction of new sidewalks.~|~21 - Safety~|~BB7A5F39C242F8C2B50869BA52181756A31ECCA8 118426~|~1~|~1~|~01/S5K~|~Erosion/slide repairs.~|~70 - At-Risk Coastal Infrastructure - Highway Project~|~CB1EE0AE0BC4DD6F78F6F0FB604859DC91172ACA 105506~|~1~|~3~|~03/S>2~|~!00% City of Columbus items~|~05 - 4R Maintenance - Resurfacing~|~3BE2FD4BE876C5165FCA9B427FFBDBADB538380C 105506~|~1~|~2~|~02/S>2~|~Urban Paving in the City of Columbus (FRA-62-8.53-8.82, 9.06-9.07, 9.15-9.22, 10.11-10.22, 10.62-10.77)~|~05 - 4R Maintenance - Resurfacing~|~4D9A74F70E91D1E6AABF7AE7BA030B68A0ED5D3A 105506~|~1~|~1~|~01/S>2~|~General system outside the City of Columbus: FRA-62-8.82-9.06, 9.07-9.15, 9.22-10.11, 10.22-10.62, 10.77 to 10.80~|~05 - 4R Maintenance - Resurfacing~|~940499AAB52EA207F839E7B1CFC07ACE553927CA 97886~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 26 1.65. Type A Emergency project. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BABFD6897D4B089D3D080259DC9C3666785A9BA7 119482~|~1~|~1~|~01/BRF~|~Off System Eligible bridge replacement utilizing CEAO LBR funds at 100% up to CAP.~|~10 - Bridge Replacement~|~C4CFCAF2D705BDBAB888A4C46C76640411EA93F7 123909~|~1~|~1~|~01/CMQ~|~Widening of Kemp Road from I-675 to Grange Hall Road to add a two-way left turn lane. Addition of sidewalk to both sides of Kemp Road. Minor horizontal and vertical profile improvements.~|~21 - Safety~|~8D14C3CD1736AD173596049D80EBC078A2405295 116911~|~1~|~1~|~01/SAF~|~District-Wide polyester pavement markers~|~21 - Safety~|~3CBA06146648B0D986632D62C3475B7758F8B873 116911~|~1~|~2~|~02/SAF~|~District-Wide polyester pavement markers~|~17 - Construction Engineering~|~B27CE489D9842D74A935D2C2061F76F7DCCA2F5A 121586~|~1~|~1~|~01/STR~|~Culvert Replacement.~|~04 - Reconstruction - No Added Capacity~|~01C291F85FA81E6F56A48829F6DC9CE9C62B2A11 121586~|~1~|~2~|~02/STR~|~Culvert Replacement ~|~~|~079500CC302914B57D790BC35AA5D8E16669DC6A 106553~|~1~|~2~|~02/NHS~|~Removal of structure on ATH US 33 14.63, SFN 0500887.~|~10 - Bridge Replacement~|~CD345A6EF1BA473890F7242F58087BE129C3081A 106553~|~1~|~1~|~01/NHS~|~Resurfacing project on ATH US 33 14.00-16.00. Includes concrete repair and asphalt resurfacing on mainline. Most of the work will focus on asphalt resurfacing of the ramps at that location. Funding is 100% State on NHS.~|~04 - Reconstruction - No Added Capacity~|~E829107AA4FEB1E844C2365EC805F5AA9D41DEE9 126725~|~1~|~1~|~01/STR~|~ATH 56 6.24 (SFN 0502529) bridge removal/embankment fill old railroad.~|~10 - Bridge Replacement~|~837B5526AF83C75B19E57424287242370422BBA3 103278~|~1~|~1~|~01/NFP~|~Replacing signs on various 2 lane routes in ATB County.~|~21 - Safety~|~943CD51A495732F15D2462CA8066CE1D40461839 121118~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing.~|~~|~C355B1115B3401D760A1B91B742ED03A9A8A3C80 119883~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-B~|~63 - Electric Vehicles & Charging Infrastructure~|~EE865CE5AAD22996D1672DA77751BA744BB64827 116580~|~1~|~1~|~01/S5K~|~Reconstruction of 5th Street.~|~04 - Reconstruction - No Added Capacity~|~B2EBB506D4F3EFAF1F02E05702C2D2FC8220B117 94792~|~1~|~1~|~01/NFA~|~Construct 2 missing trail links on the existing 96 mile trail from Cincinnati to Urbana.~|~~|~7E5F4335397B53DD5D34B3A222459401A01F24AA 98908~|~1~|~1~|~01/NFP~|~TID funded project for culvert replacements, grading of berms and ditches, and resurfacing of ATH CR 53. Agreement number 18595. Funded 100% state TID.~|~04 - Reconstruction - No Added Capacity~|~468E8DE263C4663A98C972448ED0BA635B69CFFE 93984~|~1~|~1~|~01/NFA~|~Brdg Replacement It is proposed, on CR 13, Franklin Valley Road, to replace the structure, SFN 4030613 (1.47). 80% Fed/20 % local match 01/FNA/BR/Jackson~|~10 - Bridge Replacement~|~35441D94269CCEF53ED5A58D29FABD18518AC072 84167~|~1~|~3~|~03/NFA~|~Bridge painting project. MOE 379 0174 (SFN 5602734) and NOB 724 0189 (SFN 6105076). Not on an federal aid system funded 80 federal/20 state.~|~44 - Other~|~1993A291C4EC3B140B5442442B38AEB6C7317332 84167~|~1~|~1~|~01/STR~|~Bridge painting project. MOE 800 1532 (SFN 5603242). Rural other federal aid funded 80 federal/20 state.~|~44 - Other~|~4AABD8310F7099BABCA2D3E44D4B24A578D54632 84167~|~1~|~2~|~02/NHS~|~Bridge painting project. WAS 7 4462 (SFN 8400547) and WAS 7 5280 (SFN 8400660). NHS route funded 80 federal/20 state.~|~44 - Other~|~C4CE8CFD0F526E1C4A5F5D17FED4ECF7102B39E5 104661~|~1~|~1~|~01/STR~|~Replacing linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~4482C8B71591BC51A27B1C0E551AE79B7E070C13 104661~|~1~|~2~|~02/STR~|~Deck overlay and minor work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~ABA8A06D731359B71954DEF60D0D0AA84132FDC1 113166~|~1~|~1~|~01/STR~|~Landslide repair project WAS 821 13.28.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B0D9E1B9DA3C1D76782B348FB16CC82104A5796C 108465~|~1~|~1~|~01/SAF~|~Plan split for ALL work related to the intersection at SR 2 and Byrne Rd.~|~21 - Safety~|~F98DA2930DCE5D87FE842EEC922673F10886F081 108465~|~2~|~2~|~02/SAF~|~Plan split for ALL work related to the intersection at SR 2 & McCord Rd.~|~21 - Safety~|~688E056818498872F2CAB6C11089F1B6B543151E 100046~|~1~|~1~|~01/CMQ~|~Construction of a 10' wide multi-use trail from the Evans Recreation Area to State Street.~|~28 - Facilities for Pedestrians & Bicycles~|~0592240F3BDCE530F7265CE65568F231005F3468 100046~|~2~|~2~|~02/CMQ~|~Construction of a 10" shared use path from Fairbanks Avenue (near Boldface Park) to the Gilday Riverside Playfield.~|~28 - Facilities for Pedestrians & Bicycles~|~B073D7EC7F3B3F98407F7F84557E1E468F3007E5 109681~|~1~|~1~|~01/STR~|~Resurfacing SR 43~|~05 - 4R Maintenance - Resurfacing~|~EE6C68D952B72B2DAA3BB17AD562052D66631B64 111315~|~1~|~1~|~01/NFP~|~Nagel Rd Widening Project.~|~03 - Reconstruction - Added Capacity~|~F67945E7A6B792DBBAD61C8D0559D0B84BC0A308 125371~|~1~|~1~|~01/STR~|~Crack seal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0A74B836472CC7DA871C40A614BB9B8F5CBE2B70 97404~|~1~|~2~|~02/NFA~|~Replace SFN 6734464 POR-TR 280-0.47 Norton Rd over Silver Creek.~|~10 - Bridge Replacement~|~00A24774997646B492D1DE2E1BCE08FA4085F116 97404~|~1~|~1~|~01/NFA~|~Replace SFN 6760023 POR-MR 277-0.04 Allen Drive over Fish Creek (City of Kent)~|~10 - Bridge Replacement~|~5DCA26B1CACF6F17B16C0E4C403FDE0537009AAF 97404~|~1~|~3~|~03/NFA~|~Relpace SFN 6730558 POR-TR 240-0.24 Canada Road over Trib of Cuyahoga River.~|~10 - Bridge Replacement~|~E1C4F5F014260D47E95A2C6CB96B5AE2E8A1B8C5 96052~|~1~|~1~|~01/CMQ~|~This project is for the establishment of a Park & Ride parking lot in Belmont County off of CR 102 near the interchange of IR-70 and SR 800. Inlcudes drainage, curb, lighting, and fence.~|~21 - Safety~|~0CBC224324D1C00DAB8CC1DB93FE77164222FDDE 116348~|~1~|~1~|~01/STR~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~8CB54DE64C3ACEF2D46F1DAFF035563D91FB3B14 110399~|~1~|~1~|~01/S>2~|~construction of bike path eligible for federal-aid~|~17 - Construction Engineering~|~94D7A2F46ED81ECEB61DB9E9A14B43F343FC9308 84877~|~1~|~1~|~01/BRF/PCEO~|~County Engineers Association Local Bridge Program Funding -4B87 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Perry County replacing deficient bridge, SFN 6430473 (Per-CR 18-00.90) carrying CR 18 over a stream~|~10 - Bridge Replacement~|~99CA59075E564B4ABC745361542A2112B0AF1891 123235~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~7FE86BA8F21543B6AF20E1180CF6733F5AAA06C7 100618~|~1~|~1~|~01/STR~|~Microsurfacing of HOL-62 from SLM 9.88 to 14.18 and HOL-83 from Holmesville NCL to Wayne County, including pavement repairs and pavement mearkings.~|~05 - 4R Maintenance - Resurfacing~|~50F30810118813ADAC34620F66521A8028E93E3C 127139~|~1~|~1~|~01/SAE~|~Installation of raised pavement markers on various county routes in Fayette County.~|~21 - Safety~|~CB0D0AED08F424C0E653DC23954B95076097A855 106274~|~1~|~5~|~05/NHS~|~Bridge sealing for SFN 2502712.~|~47 - Bridge Preventive Maintenance~|~FFA57C0C47B3D4C10B747AAB11424187992A635D 106274~|~1~|~6~|~06/NHS/COB~|~City of Bexley Urban Paving NHS Plan Split: FRA-40-15.30-15.71~|~05 - 4R Maintenance - Resurfacing~|~01F403C4ACA7978D8C56C6CD3FD81477C8B3A17A 106274~|~1~|~1~|~01/S<2/COB~|~Bexley Urban Paving Plan Split: FRA-40-16.01-16.82. This includes surface related items paid for at 80% ODOT & 20% local, such as milling, asphalt, tack coat, long line pavement striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~D4107B60E7DC23DCC05DC999CE892E7366A42324 106274~|~1~|~2~|~02/S<2~|~100% City of Bexley urban paving plan split.This includes items that are paid for 100% by the City of Bexley, such as pavement repairs, special striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~336A42AD98752A6E533CE2AFEF2642B302299226 106274~|~1~|~3~|~03/NHS~|~Columbus Urban Paving plan split: FRA-40-15.27-15.30 & 15.30-15.70 (right side of the road only).This includes surface related items paid for at 80% ODOT and 20% local, such as, milling, asphalt, tack coat, long line pavement striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~F68E02DF5F278AA51489DA5C3545F2CDFE083142 106274~|~1~|~4~|~04/NHS~|~City of Columbus 100% plan split.This includes items that are paid for 100% by the City of Columbus, such as pavement repairs, special striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~56D8AA46EEBDECF56FE60D4880135E5D1D7353EE 119094~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~~|~8AF92884E43020D5BB00AA3C624A465F3D2B9E11 100613~|~1~|~1~|~01/STR~|~Chip sealing JEF-152 from Richmond Corp. Line to Empire Corp. Line.~|~05 - 4R Maintenance - Resurfacing~|~0744E499CF2C3FCA65D1421FB5EE7D84032FECBE 100613~|~1~|~2~|~02/S<2~|~Chip sealing from the Empire Corp. Line to SR 7.~|~05 - 4R Maintenance - Resurfacing~|~97DD6A00FE4C0D243F8414A298F7450564D79271 105921~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Licking County bridge replacement funded CEAO with federal max of $1,567,168~|~10 - Bridge Replacement~|~E6BD7492BF0EA405008075FCFD1640E58DBC907E 101480~|~1~|~1~|~01/NHS~|~DSR# COL-001~|~04 - Reconstruction - No Added Capacity~|~C199345D38558DE418FA101E455213589660D8FA 101480~|~1~|~2~|~02/NHS~|~change order to pay for damage claim~|~04 - Reconstruction - No Added Capacity~|~85ACBB577142B423613D95B041A06EC24CB4AC22 108876~|~1~|~1~|~01/STR/KCEO~|~CEAO CSTP Funding - 4B77 (80% Federal) / LNTP (20% Local) - CAP (See CAP Comments) - 1) Kno-CR 53 (Lock Road) from 00.00 to 00.81; 2) Kno-CR 53 (Lock-Homer Road) from 00.81 to 02.79;~|~05 - 4R Maintenance - Resurfacing~|~27EA691BD57DFB96F71F8A7379A449F9933D62F0 123761~|~1~|~1~|~01/IMS~|~Plan split for sign replacements~|~21 - Safety~|~CFE078A6F762CC59A2CA56EB7486D95D1FCC2299 110522~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~03FC28CDE0F245703AACE4AAE4CEFD881ED88D11 99827~|~1~|~1~|~01/MPO~|~Funding to cover interconnect replacement or new interconnect installation within Whitehall.~|~21 - Safety~|~4E37940FA0CB72A33283DAAB1C5FE42859ADF3C5 99827~|~1~|~2~|~02/S>2~|~Items not eligible for project participation.Signal work at: Broad St at Eastway Village Dr., Hamilton Rd at Immke, and Hamilton Rd at Woodcliff.To be paid 100% by the City of Whitehall.~|~21 - Safety~|~B70A1055563FEC26707CFF6BC1855E86988E0C00 105164~|~1~|~1~|~01/STR~|~AC Overly on SR 350 STP Rural in Clinton and Warren counties.~|~~|~9A13A979D01822620CA62F4DC091AB8E1BDEEC8F 105164~|~1~|~2~|~02/STR~|~This plan split is for bridge work on this project.~|~~|~9A8923928F5C9B85534CA0CFB5CA1A8FAE54B4B4 92418~|~1~|~1~|~01/NFA~|~Resurfacing of existing drives and parking lots at Stillwater Prairie Reserve.~|~05 - 4R Maintenance - Resurfacing~|~DD553601D864CF4026956F860FBA4EA18FC69D67 95539~|~1~|~1~|~01/STR~|~General System Resurfacing including pavement repairs and pavement markings on HOL-62 and HOL-60.~|~05 - 4R Maintenance - Resurfacing~|~5F8EA3C1DB8DE68112BF05558BDCAD22AD4DC1E2 100616~|~1~|~1~|~01/NHS~|~Sealin bridge decks throughtout the District~|~47 - Bridge Preventive Maintenance~|~F7BE901063B5709A1F024E9635405A557E9C1B4E 104885~|~1~|~1~|~01/NFA~|~D09 Guardrail FY23~|~21 - Safety~|~77CBFD34A1AE2A8083348D3336E9DD8C91B5F665 102847~|~1~|~1~|~01/NFA~|~FY2022 District wide raised pavement markers.~|~44 - Other~|~D672222846BE1E82361E1F6E43D47D389A0B61F9 126519~|~1~|~1~|~01/SAF~|~Plan split for all federally funded construction items. ~|~21 - Safety~|~000F5F8209DD53B3D2124233996741A9FC640F9A 103434~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~C255C428D8E4AB97F9709A05AFE829DA1858112C 95861~|~1~|~1~|~01/NFP~|~Culvert at SLM 22.50~|~~|~1D5B0491007EF8BEF36780C21479D6979B48EB53 116141~|~1~|~1~|~01/STR~|~Resurface SR 47 with Asphalt Concrete~|~05 - 4R Maintenance - Resurfacing~|~C2F77EA72FCBEF4EF4DA1D2F3E6123E23C651B12 108709~|~1~|~1~|~01/NHS~|~This project is for the installation only of the State of Ohio's state line slogan signs.~|~21 - Safety~|~96C76B7A48802DEF4D48A80A4E197A58B012F92F 96880~|~1~|~1~|~01/ENH~|~Resurfacing of Holmes County Trail from Millersburg to Wayne County line; asphalt, double chip seal and limited repairs. Transportation Alternatives funds at 80% fed/20% local.~|~05 - 4R Maintenance - Resurfacing~|~54EE3369096D64873AA90AEE0FDABA348AD7C78B 112966~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~6502F3DFF59117909C9E33903370C9105BEB903D 112966~|~1~|~2~|~02/NFA~|~Not on the federal aid system plan split.~|~~|~4F64EF47D6ED7659C1E03164E5D40E1D9C907CB1 113084~|~1~|~1~|~01/SAF~|~District-wide raised pavement markers.~|~21 - Safety~|~E47475B6D7AF704C3662C54312F92219B3A68F1A 88534~|~1~|~1~|~01/S>2~|~Milling of existing roadway and resurfacing with asphalt concrete on SR 725 from SLM 12.80 to Alexanderville Road SLM 13.82.~|~05 - 4R Maintenance - Resurfacing~|~DE6DE864F0951ACB1F2DFA3C62A27AC6582D3F66 93771~|~1~|~1~|~01/STR~|~Reface backwalls using anodes, rebuild wingwalls using anodes, fix pier encasements and place rock channel protection at abutments on SFN 7500068 SHE SR 29 0679, Loramie Creek.~|~13 - Bridge Rehabilitation~|~3BEA1FF56476C5D688B325FD0AA5CCE61FBAD2C8 79735~|~1~|~1~|~01/NHS~|~Resurfacing~|~~|~320F7DD8B89432E84A3E5AAB7757FBF5A32D961F 112214~|~1~|~1~|~01/NFA~|~D09 RPM FY2026~|~21 - Safety~|~5B151BE6DE698BBB151CE961E2284CB22D2D3C16 100383~|~1~|~1~|~01/IMS~|~Construct noise wall.~|~44 - Other~|~1574867067C5F6247875890793E4CE6DCCC03FA5 82999~|~1~|~1~|~01/STR~|~Bridge removal project. ATH 56 0624, SFN 0502529. Rural other federal aid funded 80 federal/20 state.~|~44 - Other~|~27CDDEDDE1429E21559BE08FC46FE0C153F30E3A 121707~|~1~|~1~|~01/SAF~|~Traffic Signals - Maintenance~|~21 - Safety~|~F24EF86522956CBCBDB6BF4CBD1151AFD1D078D7 121707~|~1~|~2~|~02/SAF~|~Traffic Signals - Capital~|~21 - Safety~|~C8F87189223B5CF69F2B195AECA663EA3B7A1BF2 121707~|~1~|~3~|~03/SAE~|~Install supplemental signal heads and radar.~|~21 - Safety~|~19877C6AD7E363D610BD46BC82A7AACB6A2B51F3 99795~|~1~|~1~|~01/NHS~|~Reconstruction of US 422 from Rogers Avenue to Ridge Road in the City of Warren, Trumbull County, Ohio.~|~~|~9521C3B88D66E0ECA7DCC027CAEB7D6452F16EA7 98785~|~1~|~1~|~01/ENH~|~Repair of 2 RR bridges, rehab of 2 grade crossings and tie replacement on the HVS Railway located at Watkins Street in the City of Nelsonville and Laurel Run Road (CR 26) in Hocking County. Funded 80 federal/20 local.~|~22 - Rail/Highway crossing~|~F6865C782A185553F428763D420BD2A9BDFCB7EA 115013~|~1~|~1~|~01/STR~|~Superstructure replacements.~|~13 - Bridge Rehabilitation~|~9A053F4BE8A5FE4CFDBF84EF2DC697C53AD93B4F 115013~|~2~|~2~|~02/STR~|~Bridge replacements, 10 to 20' span.~|~04 - Reconstruction - No Added Capacity~|~E0602FB93937648DFB5547B71773F29E9C741FBE 115013~|~3~|~3~|~03/STR~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~5A4B6B7FD968CB7E5CB9BFDF8F49D440BD5CADC8 84278~|~1~|~1~|~01/BRO~|~Replace existing box culvert (BEL-800-1741, SFN 0705674) with a new four-sided concrete box.~|~10 - Bridge Replacement~|~B2913A04F89BDFC114159B64D40AD06BDE031401 125022~|~1~|~1~|~01/S50~|~Paving and sidewalk replacement/upgrade, utilizing 100% BOM 4TA7 funding.~|~05 - 4R Maintenance - Resurfacing~|~71477BD9F5FDC280DE0D25982B6B62E53BDB6B0E 105512~|~1~|~3~|~03/STR~|~items to be paid 100% by Plain City~|~05 - 4R Maintenance - Resurfacing~|~50637C7244A429DCA5167E1CBB598689E77B107D 105512~|~1~|~2~|~02/S>2~|~Paving within the Columbus Urban Area. FRA-161-0.00 to 0.68~|~05 - 4R Maintenance - Resurfacing~|~70B50E0E42ACF3BE272F97074428BED7160B2B99 105512~|~1~|~1~|~01/STR~|~Paving rural routes MAD-161-0.00 to 3.62; UNI-38-0.08 to 0.30; UNI-161-0.63 to 6.12; UNI-161-12.40 to 12.86~|~05 - 4R Maintenance - Resurfacing~|~43ED4169B42C610C73E3DA2A2DB0418C7AB067C5 90232~|~1~|~1~|~01/S<2~|~?01/S<2/PV/Steu? ? In Steubenville plane and pave pavement, provide ADA accessible curb ramps, etc. on CR 22 (Brady and University) eligible for 80/20 MPO/City.~|~05 - 4R Maintenance - Resurfacing~|~68559BF02D38806F0D9F49E6690ECBF97E823059 90232~|~1~|~4~|~04/S<2~|~?04/S<2/PV/Steu? ? Plane and pave, including striping on the SR 822 portion of the project eligibile under the Urban paving policy at 80/20 District/City.~|~05 - 4R Maintenance - Resurfacing~|~8F245618999CD4477575B6C357DA06C610A74F02 90232~|~1~|~3~|~03/S<2~|~?03/S<2/PV/Steu? ? Plane and pave non federal aid roadways (Franklin Ave), to inlcude striping - 100% City.~|~05 - 4R Maintenance - Resurfacing~|~C1C1DC4B0A2663A26BEA330BCF2C77E326219D18 90232~|~1~|~2~|~02/MPO~|~?02/MPO/PV/Steu? ? Traffic control items eligible for 100% MPO.~|~21 - Safety~|~F2DB966AEC86713E700F1F6E9353F0BF460FE8F5 119749~|~1~|~1~|~01/NFP~|~Creating plan split for TED involvement~|~~|~89F0B5CE306499D7E9BF54C034DC81C96CEE2F31 103921~|~1~|~1~|~01/NHS~|~Culvert Replacement: ERI-6-13.19~|~04 - Reconstruction - No Added Capacity~|~E238CC9213E68FAF7C3BC94686CAB2E773DD9C5B 84368~|~1~|~1~|~01/STR~|~general system preventive mainenance on HOL-39-0.00 to 5.72; includes chip seal, minmal pavement repair, pavement marking~|~47 - Bridge Preventive Maintenance~|~4050C1E7202D6D57DC35ECBDAAAC412D2B97D4AB 121098~|~1~|~1~|~01/IMS~|~Established Plan Split for CO CC 1~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~51FA50D09FCF5AE48ADDCBFED6D3320A67D5B285 114448~|~1~|~1~|~01/NFP~|~Created for potential J&C involvement~|~44 - Other~|~DC856AC9718BE9A20180268005B890FFCADFAC07 124360~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federal bridge on the interstate system.~|~13 - Bridge Rehabilitation~|~F786B61A0F26CC5ACA66C8EEAD77FABB8CE6EA11 110300~|~1~|~1~|~01/NHS~|~Construct noise walls along SR 104~|~01 - New Construction~|~7E0AFC3797FD6408FCFC86A619A3FEDAADF12C4B 103472~|~1~|~1~|~01/NFA~|~The County is constructing roadwork improvements to alleviate flooding on Industrial Pkwy in the Lawrence Township Industrial Park. Over 3,200 feet of Industrial Pkwy flood making the road impassable for employees and the movement of goods~|~01 - New Construction~|~D3E232795A8F027D0AC5D29345B0FB48CFF7DE10 93874~|~1~|~1~|~01/MPO~|~Mill 2" and pave 3" of asphalt on Marks Road (CR 22) from Hamilton Road to SR 303, 2.83 miles.~|~05 - 4R Maintenance - Resurfacing~|~12D91A93C3FF30C62E662F3B7760A5A82458453E 93874~|~1~|~2~|~02/ENH~|~100% local items~|~05 - 4R Maintenance - Resurfacing~|~23329ACC3EDB55C0EBB8B34AF43651B0BFDB9AD2 84432~|~1~|~1~|~01/BRO~|~It is proposed to replace the deck on structure 0103187. Project Termini: Project is 0.14 mile east of TR312 (Riley Hollow Road) 0103187 ADA SR125 19.68 Intersect: Middle Br Of Mill Creek80% fed/20% state01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~D572F3C4728E5B8D4248E1D33CFC3B0F8922DDDF 110237~|~1~|~1~|~01/CMQ~|~Construction of 3.5 miles of 10? wide separated bike trail from existing bike trail at Troy-Sidney Road to Casstown-Sidney Road.~|~~|~F02E91767B65FEE5353D3D69197E04A11F6CDA4C 116683~|~1~|~1~|~01/STR~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~9BF725C1254C7B349192F7259D00934916EDD04C 125637~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~6CAEDBA80346920C4F41D2CA509EFC495A69F418 110330~|~1~|~1~|~01/SAF~|~funding Split for roundabout and TWLTL~|~04 - Reconstruction - No Added Capacity~|~AD17C572D766755CFC71DA81CF34760A2FC76D9F 99000~|~1~|~1~|~01/S>2~|~Summit St~|~28 - Facilities for Pedestrians & Bicycles~|~65A1E6D38DE7C3C7051666323EC4ABE14C97B05A 99000~|~1~|~2~|~02/S>2~|~100% City costs for alt bid items~|~28 - Facilities for Pedestrians & Bicycles~|~284831E176ADD6BE2F0D8AFD8403C0212D455739 119967~|~1~|~1~|~01/CMQ~|~Construction of a single lane roundabout at Lions Bridge~|~04 - Reconstruction - No Added Capacity~|~92C6EA9295AACACCF425CC2AB4DDD3F67F3C2CBA 121246~|~1~|~1~|~01/SAF~|~Delineator replacements in D8~|~21 - Safety~|~FD8816F492A5015D52D5AFC8BD7F5DB9C023EF66 104322~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work om STP Urban~|~05 - 4R Maintenance - Resurfacing~|~C3FF09E485FD743BE3975E5F371733FBB163C823 104322~|~1~|~2~|~02/STR~|~Plan Split for resurfacing work in STP rural, CUY 322 from SLM 15.592 to 16.702.~|~05 - 4R Maintenance - Resurfacing~|~162BC591A22C453C6D81258BF24E73DC6373F59F 115850~|~1~|~1~|~01/STR~|~Culvert replacement project.~|~17 - Construction Engineering~|~EABD38EA5F7A00491529691C24032299027294A4 84553~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 339 16.57-20.44 and 20.61-24.81. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~9DFC8E62124760FE3E2D0817382147995784CD84 115805~|~1~|~1~|~01/STR/FCEO~|~Fairfield County Engineer's CEAO CSTP Program - 4B77 (80% Federal) / LNTP (20 % Local) - See CAP Comment - Project to convert the All Way Stop at the intersection of Coon Path Road (CR 31) and Election House Road (CR 40) to a roundabout to include lighting.~|~21 - Safety~|~943DD3361187286A389D46A967F4A14A02D5150D 113468~|~1~|~1~|~01/S>2~|~Install walk along the east side of South Gettysburg Avenue from Prison Road to 1812 S. Gettysburg Ave and along the west side from Prison Road to Nicholas Road.~|~28 - Facilities for Pedestrians & Bicycles~|~24AAFFA4A59F18E27AAC1E71A55C9814BB2FC84F 113468~|~1~|~2~|~02/SAF~|~Alternative Items - 100% Local costs~|~28 - Facilities for Pedestrians & Bicycles~|~CD6C919306AA16ADBC9173CE018677B902FD5106 94473~|~1~|~1~|~01/STR~|~Along Various routes in D-2.~|~21 - Safety~|~231CC629BAA026D1116375FA5FE60F328D31214B 110672~|~1~|~5~|~05/STR~|~Minor bridge rehab 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~04F5BF5260C7B15AAFAF0BEFD61B872EF068F56E 110672~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A4448E57CCCCC154ACA6161EFF6152874C39E0C2 110672~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~17DC1E062AE9A6DF73AEA43E01C8E86CBD546A0D 110672~|~1~|~3~|~03/NHS~|~Minor bridge work > 20 span.~|~13 - Bridge Rehabilitation~|~0F4973DCD2D8C09E772662D6B79886FF38043DEC 110672~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~F237970FF785760F82FF40B58595F137588D54D1 111592~|~1~|~1~|~01/NHS~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~4826FB957EABDD07E4DE77A2DCA45BF2904A7CCA 111592~|~1~|~2~|~02/SAF~|~Plan split for safety funded items (RRFBs)~|~05 - 4R Maintenance - Resurfacing~|~2CC547781A678257C98D7273AB7D831F75EBB1D7 91530~|~1~|~1~|~01/SAF~|~90/10 fed/state funding split for all work using federal safety funds.~|~21 - Safety~|~6CD831DD6FCB35F432FC0698AF405B1B6F319342 91530~|~1~|~2~|~02/NFP~|~Split 2 for 100% state items of work~|~21 - Safety~|~0EE7BCC3531092202D4B43531D7411A2B63522C5 110086~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~44977518F84C73B875B6246013B27DBFE1FCCFA0 110086~|~1~|~2~|~02/NHS~|~NHS Plan split.~|~05 - 4R Maintenance - Resurfacing~|~B125AE1D5B2C9BE41EEE6447EF583F2F2B28172C 110086~|~1~|~3~|~03/S<2~|~Urban Area plan split.~|~05 - 4R Maintenance - Resurfacing~|~44F1F999211575FB44043E9289FEF5A59A9B97B1 110086~|~1~|~4~|~04/STR~|~Rural Plan split.~|~05 - 4R Maintenance - Resurfacing~|~DFC2A0DBE83C3AA2A2FEBD4079EFD26AFF69DD56 119706~|~1~|~1~|~01/BRF/CRKV~|~Replacement of bridge along Buckeye Street (SFN 6461212)~|~10 - Bridge Replacement~|~B644843395A36639E7D3DA02317EEA34608A6B6F 104079~|~1~|~1~|~01/ENH/LCPD~|~"01/ENH/OT/LCPD" - Licking Park District approved TA funding for Multi-Use path - Max dollar amount at 95% funding $83,096.53~|~~|~7C5168ECA34620EC6753DFF571C204FB614288B7 112947~|~1~|~1~|~01/IMS~|~Split for culvert work on the interstate system.~|~04 - Reconstruction - No Added Capacity~|~12BA6DE6A0F24EBFEF3ACBF6C226ACC0CB9E2EF4 112947~|~1~|~2~|~02/NHS~|~Culvert work on the NHS~|~04 - Reconstruction - No Added Capacity~|~D059D0A29BFE85BCF163E791AAD36080C294840E 112947~|~1~|~3~|~03/S>2~|~Split for urban STP culvert work~|~04 - Reconstruction - No Added Capacity~|~B555A40E1626621EC74B1965654C0FC2C36131D5 112947~|~1~|~4~|~04/STR~|~Split for rural STP culvert work~|~04 - Reconstruction - No Added Capacity~|~A4713FAFEFF272B2536C5BB5E1C8AF60A437705B 85264~|~1~|~1~|~01/NHS~|~resurface SEN US23 0-9.98; SEN-23 from Wyandot Co Line to Fostoria;~|~05 - 4R Maintenance - Resurfacing~|~D38EE6E448379FF6E51AF920F123159E071EB7EB 85264~|~1~|~2~|~02/NHS~|~SEN-23-7.62~|~13 - Bridge Rehabilitation~|~345FD8F1A2132BF3A5D948C0552D8EC5EE8F54FF 85264~|~1~|~3~|~03/SAF~|~Center Line Rumble Stripe Plan split - Sen - US 23 - 0.0 to 9.98~|~21 - Safety~|~B5151BFF96CD6342DB34FEBAB60190BC7732A9C2 106405~|~1~|~1~|~01/STR~|~Widen US 36 and install signal at CR 605 (Condit Rd)~|~21 - Safety~|~C8DC5B403EF72E645714779184575A18DE82060A 106405~|~1~|~2~|~02/STR~|~Replace and enlarge culvert carrying Chadwick Ditch (SLM 25.89)~|~04 - Reconstruction - No Added Capacity~|~DFC071EDD7B50AE5D0E5326D5E2239AEC8EA48DB 97488~|~1~|~2~|~02/NFP~|~Culvert replacement of CFN 780450360 TRU-45-18.13~|~44 - Other~|~EDFEB34869B602648C6558F57922BEDF8E561981 97488~|~1~|~1~|~01/NFP~|~Bridge replacement of SFN 7801653 TRU-SR 7-25.11 over Branch of Stratton Creek~|~44 - Other~|~E186DF5578AED6F243751F4A083FBFAD04F19108 96894~|~1~|~1~|~01/ENH~|~Testing~|~04 - Reconstruction - No Added Capacity~|~9AF765149117DD9FC9CDFC3576721DBA313FCCE3 96894~|~1~|~2~|~02/IMS~|~test~|~~|~6AF05E87C63A75FCD69AB840289B50B1C122B370 114692~|~1~|~1~|~01/SAF~|~District wide pavement markings and RPM contract in D8. Locations to be determined.~|~21 - Safety~|~2DF751A3236381532268008B839A1BDF7ACE42BA 116752~|~1~|~1~|~01/IMS~|~Plan Split for the maintenance and repair of the Big Darby Levee.~|~44 - Other~|~D9AA201ABD213B2ABFD4CE8304B48A58D4535DD2 92796~|~1~|~1~|~01/NFA~|~100% facility funding~|~44 - Other~|~F2B021DEA3BB454DCFA6A80C70F02AA7C6BE10FF 103883~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~0126CC56BCEDC42EF09479E7621E59D1E209F0B1 103883~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C34B601AAB546147814D50DD0ACAAE114CB8AD42 124924~|~1~|~1~|~01/NFP~|~CO~|~~|~44005660A48862D4BF958200950CC55CEC9FEFEB 106757~|~1~|~1~|~01/IMS~|~Noise wall maintenance.~|~~|~6F33FCC5F80BE29D80C27C501EA410FAF98E73EB 100428~|~1~|~1~|~01/STR~|~Two lane resurfacing project using a chip seal treatment. HOC 56 4.41-9.44. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~16804C3B4B6B8E13FFF633CC7E2AF541CB692725 109069~|~1~|~1~|~01/STR~|~UNI-739 from 0.63 to 5.94~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~08AF59D110C7498AA88612A1FF6490CAB4260C13 109069~|~1~|~2~|~02/SAF~|~UNI-739 - Installation of Item 618 - CL Rumble Stripes and Item 874 - LJ Prep~|~21 - Safety~|~D3616886D803D465596C06831F39FFE03AC1F9ED 109069~|~1~|~3~|~03/STR~|~Concrete deck overlay on structure UNI-739-0233~|~47 - Bridge Preventive Maintenance~|~ACB656492EB9BF36C9F84C47D065F519B0504D37 110645~|~1~|~5~|~05/STR~|~Minor bridge rehab > 20' structure.~|~~|~8D77A4A23E71171947591BCF3DC1D3C593E4F695 110645~|~1~|~6~|~06/STR~|~Minor bridge rehab 10' to 20' structure.~|~~|~FB24A915938C0A4D434BBF81E68457017F8E23B0 110645~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~51DB905DFB3261D2F513B7A8591DAE7FEE7F3695 110645~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~70B5EFB9D494B1670B12FD6A91185F5A7D4C048D 110645~|~1~|~4~|~04/S5K~|~Minor bridge work > 20' span.~|~~|~433B59A7080C1686D83F32D1F5FC8AC3160BD082 110645~|~1~|~3~|~03/IMS~|~Minor bridge rehab.~|~~|~8F7C655486D49F2CFA4C969F5D4F043B3F455E52 102445~|~1~|~1~|~01/STR~|~Herbicidal Spraying in BEL, HAS and JEF~|~44 - Other~|~1425CD042D9645C7C40858A2CFF6BE6CEC9880DC 101463~|~1~|~1~|~01/S<2~|~City of Jackson Main St.~|~04 - Reconstruction - No Added Capacity~|~A4659FC0C11E93484B92AB25C15163A929BE1840 19468~|~1~|~1~|~01/IMS~|~Reconstruct intersection Ramp C/D and CR 74 including new traffic signal and turn lanes using district allocated funds 4PF7 & 4PS7 sacs.~|~04 - Reconstruction - No Added Capacity~|~14AAEDE350536A98FD6E53AAAE1D56AE3C57A249 100574~|~1~|~1~|~01/NHS~|~ROS 23 (1.95-4.65)~|~05 - 4R Maintenance - Resurfacing~|~504924661566426D0DED46BB339D030859B0E99E 91460~|~1~|~2~|~02/S<2~|~General system paving and urban func class areaFAY-41: 10.33-10.76, 11.00-11.11, 13.03-15.48~|~05 - 4R Maintenance - Resurfacing~|~42ACF7039180B4AD082F607D1C627739E66C5103 91460~|~1~|~4~|~04/NFP~|~Not on Federal Aid System Split: FAY-753-10.37-10.51~|~05 - 4R Maintenance - Resurfacing~|~D7285F6C1AC1A78161340CA4C3673C70587E3A23 91460~|~1~|~1~|~01/STR~|~General system paving and rural func classFAY-41: 0.00-10.33, 15.48-21.99; FAY-753:10.37-12.77~|~05 - 4R Maintenance - Resurfacing~|~43D09D26D8717346BEF826271D11C30CA43E70A6 91460~|~1~|~3~|~03/S<2~|~WCH urban paving and in urban func class areaFAY-41: 10.76-11.00, 11.11-11.66, 12.15-13.03~|~05 - 4R Maintenance - Resurfacing~|~B7F3D83B058E269E1D3EAE49929825F676C9F5CB 118518~|~1~|~1~|~01/NHS~|~added plan split.~|~10 - Bridge Replacement~|~9174D438C49F4C45FB10E15DFA045F61D5C13D87 120687~|~1~|~1~|~01/NFP~|~Test lab~|~17 - Construction Engineering~|~A209E6F918ECF2A8E5447E2C72EE65CCB0FEF61D 115477~|~1~|~1~|~01/NFP~|~Resurfacing of F-1 parking lots and Marina in TRU Mosquito State Park.~|~~|~22C9BFB49A78C856CD5E39AC793DF94AB2A382D5 122031~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~035CD94FC8638EA8DAE98F47FF4F2698761AF5F8 88035~|~1~|~1~|~01/IMS~|~Tentative split for IM portion of FRA-70 reconstruction~|~03 - Reconstruction - Added Capacity~|~558728C38186BD05C322112235C1A10DE0C279A6 88035~|~1~|~2~|~02/NHS~|~Tentative split for NH/add lane portion of FRA-70 reconstruction~|~03 - Reconstruction - Added Capacity~|~A2DDF3A92586BFDBA75450A2EDD65F020CFB07D6 93383~|~1~|~1~|~01/STR~|~Deck replacement project with steel beam end repair/paint. GAL 160 1884, SFN 2702371. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~27653DBCE2758963F6058F301CA149B4D41D9084 98970~|~1~|~1~|~01/ENH/TCE~|~Construct sidewalks along North River Road in Howland Township, Trumbull County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~CE677ED7B1CCF581AC7B4B15C0E1E9A6061BA29F 119263~|~1~|~1~|~01/IMS~|~Mowing~|~44 - Other~|~1372F9F1EA81C8E167488E3C7D912E36E336C14D 123709~|~1~|~1~|~01/STR~|~plan split for the rural locations on WAR-741~|~05 - 4R Maintenance - Resurfacing~|~8A41D3343B20A7D5827D74F235446EE6D5FA7059 123709~|~1~|~2~|~02/S>2~|~plan split for the Large Urban sections on WAR-741~|~05 - 4R Maintenance - Resurfacing~|~5CED2F6BC4AE4E6E2C521D5204FBAC8DACC66695 123709~|~1~|~3~|~03/S5K~|~plan split for the small urban section on WAR-741~|~05 - 4R Maintenance - Resurfacing~|~9AE29B741BF48DB49DADBB8AFBAC09F6CD6F3A62 93822~|~1~|~1~|~01/S>2~|~Resurfacing of State Route 91 from Ohio Turnpike Bridge to Middleton Road in the City of Hudson. Includes turn lane additions at Valley View Road, Herrick Park Drive, and Hines Hill Road. Includes possible ADA ramps, improved lighting, signals, as needed.~|~05 - 4R Maintenance - Resurfacing~|~FE7AC37461D2E04C503C904F5F252C315B5299FE 96250~|~1~|~1~|~01/STR~|~100% 4PS7 - Task Order Construction Inspection~|~17 - Construction Engineering~|~EC4CB9A7EFD82C849658A0C4688F4B03A78E9A44 97574~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. PRE-CALNT-0005 (SFN: 6842356) in the Village of New Paris.~|~10 - Bridge Replacement~|~81C4C919AE8344977C05E36BBBCFC4A329E30C0F 87612~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4CP7 (100% State) - Two year contract for mowing along the Interstate Routes within District 5.~|~17 - Construction Engineering~|~FE1ED41674E78E3B7C8F9BBA390667063DAA3485 81104~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 325 8.64, SFN 2703572. 80/20% Federal/State.~|~10 - Bridge Replacement~|~2F4FE58049C291E441ADBC062A93C03034BAA3A9 124001~|~1~|~1~|~01/S5K~|~Resurfacing on SR 66 in the City of Defiance using urban paving funds. Funded at 80% SAC 4PF7 with a 20% local match provided by Defiance. ~|~~|~0AFF1A1B1CCA1D9D87A4558D8DFEF236899BF920 124001~|~1~|~2~|~02/NFP~|~100% city items. Auxiliary pavement markings, pavement repairs. ~|~~|~D46215E1A288E878EEDC613F1121D162CBB8B21A 116328~|~1~|~1~|~01/NHS~|~Plan Split for the NHS locations~|~05 - 4R Maintenance - Resurfacing~|~C7826D6262D502AF3794370ED73117BB85D69B84 116328~|~1~|~2~|~02/STR~|~Plan Split for the Rural sections~|~05 - 4R Maintenance - Resurfacing~|~AF784D09C9CBCD7CF73174F01E479F2AC37737B2 116328~|~1~|~3~|~03/S5K~|~Plan split for the small urban sections~|~05 - 4R Maintenance - Resurfacing~|~55731EE549437C121DC9E2A15E3EB2071AE6FEFD 105453~|~1~|~1~|~01/IMS~|~IR 71 existing pavement resurfacing (Main St to S of Broad St and S of Long St to IR 670 interchange)~|~04 - Reconstruction - No Added Capacity~|~1CA7590E2028B939A1433883C6FBC7F613C8F915 105453~|~1~|~5~|~05/IMS~|~Project eligible utility items (Waterworks, sanitary, electric, traffic surveillance~|~04 - Reconstruction - No Added Capacity~|~3C1B75F4919CFBF1C4F7B65C44AD3151280236CA 105453~|~1~|~6~|~06/MPO/Cols~|~MORPC and Columbus funded enhancements~|~04 - Reconstruction - No Added Capacity~|~A4A0D70ECA465F41BB4079D4D5FF1206C2EB1DBA 105453~|~1~|~7~|~07/S>2/Cols~|~100% City of Columbus funded items~|~04 - Reconstruction - No Added Capacity~|~96FD3CC4A5FD278B5E1F7B13862F2AF1DE609D78 105453~|~1~|~8~|~08/ENH/Cols~|~Incremental items - Columbus to pay costs above standard items~|~04 - Reconstruction - No Added Capacity~|~B5CAD47D92D9EB6084ECB0594DE6EC14BF666274 105453~|~1~|~2~|~02/NHS~|~IR 71 existing pavement widening (from S of broad St to S of Long St.) and new pavements (Elijah Pierce Ave and Lester Dr)~|~03 - Reconstruction - Added Capacity~|~5CCA893B11C733412956A438BA81A7AF0AAAC637 105453~|~1~|~4~|~04/NHS~|~Broad St over IR 71 bridge replacement, widening~|~10 - Bridge Replacement~|~8C63CFA40552FDA782A4E657C9361DF7119ECC91 105453~|~1~|~3~|~03/IMS~|~Broad St over IR 71 bridge replacement, existing width, no added capacity.~|~10 - Bridge Replacement~|~29ADC4B77190B4AE39417C017D4EC5F56DC3D078 105453~|~1~|~9~|~09/IMS/AEP~|~Utility vault for AEP (Columbus to pay and be reimbursed by AEP)~|~04 - Reconstruction - No Added Capacity~|~E2C19B01AC7E40DACB859BB0229F8AA957B4091B 105453~|~1~|~10~|~10/IMS/ATT~|~Utility vault for AT&T (Columbus to pay and be reimbursed by AT&T)~|~04 - Reconstruction - No Added Capacity~|~419F173DEE95E509D871F01BA1EDE1368D839C32 105453~|~1~|~11~|~11/IMS/TW~|~Utility vault for Time Warner (Columbus to pay and be reimbursed by Time Warner)~|~04 - Reconstruction - No Added Capacity~|~0F456B461B1BE64103247022F83A0212A1BAD552 105453~|~1~|~12~|~12/IMS/Ver~|~Conduit on the Broad St bridge for Verizon (Columbus to pay and be reimbursed by Verizon)~|~04 - Reconstruction - No Added Capacity~|~4A12D967FA80525DDF943EEA8CC16DDCBC318168 105453~|~1~|~13~|~13/SAF~|~Repair of damage caused by vehicle accidents~|~21 - Safety~|~FA25275A0E9124A8B2DBE9D62FFDF4289BE9BA5B 94628~|~1~|~1~|~01/IMS~|~Provide an auxiliary lane for southbound IR71 from the Pfeiffer on ramp to the SR126 off ramp. Requires extension of a culvert and moving of a short section of noise wall. Includes resurfacing of southbound IR71 adjacent to the auxiliary lane.~|~21 - Safety~|~DF12D7C7FF39CF566C805E5FE72852CDB1A86EB2 117530~|~1~|~1~|~01/NHS~|~Rest Area Culvert~|~04 - Reconstruction - No Added Capacity~|~DA949E581B4B6BF6DEF3881D295B639659FC828E 113900~|~1~|~1~|~01/NFA~|~Created for TID involvement.~|~44 - Other~|~5983D5AF26FF2B7098B99BEF48D186062525614E 95474~|~1~|~2~|~02/NFA~|~100% local funding on resurfacing the small portion of Madison Avenue not on the federal aid system.~|~05 - 4R Maintenance - Resurfacing~|~8FEF8AEF12AB7A79140D7DE482BF48EDCA1E5C0E 95474~|~1~|~1~|~01/S>2~|~local funds~|~05 - 4R Maintenance - Resurfacing~|~DF3A086875FF035EBE1F3F8CF6291AF2F317A7FA 101874~|~1~|~1~|~01/NFA~|~Guardrail replacement on various CR in Ross County.~|~21 - Safety~|~DB50B7914DAB87125A5F4294054FADBB26589CB4 112830~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C611C4EBB0A2F92496162BFC5D89A1D19A11AA25 112830~|~1~|~2~|~02/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~36EEAC5EC4A9E1D5C2662CD366B70E742300717C 112830~|~1~|~3~|~03/STR~|~Superstructure repairs/replacement.~|~13 - Bridge Rehabilitation~|~9A445DA28CA23DB93B52D204B31774815985FD13 112830~|~1~|~4~|~04/SAF~|~Installing of RRFB at SR88/Headwaters Trail and SR82/Headwaters Trail.~|~21 - Safety~|~2BE12B187BD90D92CA21E783A7DC975358EC5BEA 105213~|~1~|~1~|~01/NHS/STRE~|~Resurfacing, urban paving in the City of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~6DD06F4C550E01B779FE135561C971D3F44E30DC 105213~|~3~|~4~|~04/CMQ/STRE~|~New signal.~|~21 - Safety~|~D83CFA6AD39F54D38285B880A91DC622E0E17FC1 105213~|~2~|~3~|~03/MPO/STRE~|~Concrete pavement replacement (with full depth concrete) at the intersection of POR SR 14 and SR 43, in the City of Streetsboro.~|~04 - Reconstruction - No Added Capacity~|~B8730E5D82113DC2DEDAA375256AB9F647D3EF9B 105213~|~1~|~2~|~02/NHS/STRE~|~Drainage work along POR SR 14 SB near SLM 1.70. Includes ADA curb ramps and full and partial depth repairs along SR 14 and SR 43.~|~04 - Reconstruction - No Added Capacity~|~30F75705F4E018545966D79C3BC1FCFA2AF41342 93813~|~1~|~1~|~01/NFP~|~This is the district's FY 14 district wide lighting maintenance construction contract using 4CP7 sac.~|~21 - Safety~|~5A8FAEE0849B7BC9FBC5396ACA11A8130288B798 106884~|~1~|~1~|~01/IMS~|~Landscape Maintenance and upkeep on existing landscape at the I-70/I-75 interchange in Montgomery County.~|~31 - Landscaping & Other Scenic Beautification~|~0479ABF5A3C7785CC1BD195135651E6D382CD42F 112937~|~1~|~1~|~01/STR~|~Rural Plan Split: MRW-19-8.78-10.40~|~05 - 4R Maintenance - Resurfacing~|~53E1D713BCD68C713ABBF75A2FB29BD04C663135 103827~|~1~|~1~|~01/SAF~|~Guardrail upgrade on NHS routes.~|~21 - Safety~|~BF1329532119918E605D3FD7F0CDA818F61A25E6 103827~|~1~|~2~|~02/SAF~|~Guardrail upgrade on Sm Urban route.~|~~|~FE42451EC3E8A1C2B09407105A2DFE1A168769F7 116105~|~1~|~1~|~01/NFA~|~Culver/Repair on Little Miami Scenic Trail ~|~28 - Facilities for Pedestrians & Bicycles~|~B5D1816A2A6E315141E772F23F05C092AA744A3D 105223~|~1~|~1~|~01/MPO~|~Work eligible for federal funding.~|~28 - Facilities for Pedestrians & Bicycles~|~E92B7A09880A5BCA4B19AD4883522A1C1F859CD4 105223~|~1~|~2~|~02/NFP~|~100% local cost pay items~|~28 - Facilities for Pedestrians & Bicycles~|~CBB594B78AF7174455F99C4A0311710CC7EC3888 123532~|~1~|~1~|~01/SAF~|~Sidewalks in Village of Sardinia. ~|~17 - Construction Engineering~|~CFE1342D6172A7630384D9AAE5032289B99ACEDF 109865~|~1~|~1~|~01/NHS~|~D09 Overlay w/ Repairs FY25~|~05 - 4R Maintenance - Resurfacing~|~273854564C3F3A6D997F6059143C0B796E48EC55 102434~|~1~|~1~|~01/NHS~|~Split for bridge rehab~|~13 - Bridge Rehabilitation~|~5A9DE4C42C6F48B59E52B86E9295D9F2BB2FC04E 102434~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~6FB941C44221AA646225A4760D40A3D13104FD7C 124802~|~1~|~1~|~01/IMS~|~All items associated with work on I-71 ramps and SR-61.~|~04 - Reconstruction - No Added Capacity~|~A32A5F5F98AC2EE5F7A59DFBF57CFE072816CBD5 92528~|~1~|~3~|~03/NHS~|~80/20 state/local funding split for urban paving along SR-82 in Broadview Hts for the NHS portion.~|~05 - 4R Maintenance - Resurfacing~|~0E49971E591C1D3EDE3CB56EC50EF9EF9C87F7C5 92528~|~1~|~4~|~04/S>2~|~80/20 state/local funding split for urban paving along SR-82 in Broadview Hts for the STP portion.~|~05 - 4R Maintenance - Resurfacing~|~5F40F4B456557B96E43A8938E0EF4710CBB41C43 92528~|~1~|~1~|~01/SAF~|~Safety funding for the reconfiguration of the SR-82 and IR-77 interchange. 90% federal/ 10% local~|~21 - Safety~|~C84B397B58B9E245AC915A17F3E0EF450D6299A3 92528~|~1~|~5~|~05/NFP~|~Split for 100% local participation and cost over capped funds.~|~21 - Safety~|~C8B0F6E5046FCF3B157C201DF06263E4A1D3FF4A 92528~|~1~|~2~|~02/CMQ~|~CMAQ funding for the reconfiguration of the I-77/SR-82 interchange. 80% federal/20% local.~|~21 - Safety~|~D008408BED3F83557DCD0811D7F48486F5881F27 104677~|~1~|~1~|~01/S>2~|~Signal upgrades on urban route in the City of New Carlisle.~|~21 - Safety~|~90C82CD97FE7D345F0EA205D2AA8D794E13B9FF5 93039~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-SR 60-17.12 to 28.10~|~05 - 4R Maintenance - Resurfacing~|~2D4E74ED85A7F59BA52CD6FAD40B5B1E783CE439 93039~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Bridges on 1) Cos-60-26.37, 2) Cos-60-26.74;~|~05 - 4R Maintenance - Resurfacing~|~926F3E250834FE9CC602D8073A5295C39857C3CA 125385~|~1~|~1~|~01/IMS~|~Resurface IR 70~|~05 - 4R Maintenance - Resurfacing~|~C5CD1BEFF5996AA18D1B34412030CFC7C56CE7ED 118622~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads.~|~21 - Safety~|~A9E5A961B72985C4D3205348F7292A76AB50433D 98321~|~1~|~1~|~01/NHS~|~D09 Smoothseal FY23~|~05 - 4R Maintenance - Resurfacing~|~2649AB88D9F01F5CB9B77B5A530272EFBE5E0A61 87720~|~1~|~1~|~01/IMS~|~Smooth Seal: ASD-71-0.00-16.15 / WAY-71-0.00-0.28District Allocation will be : 7BPB- first $7,000,000.00, remainder is 90%-4PF7/4PS7~|~05 - 4R Maintenance - Resurfacing~|~FA5D6858420ADAA1D509BCABDB5CEC21FC166CCF 119446~|~1~|~1~|~01/NHS~|~Plan split for US 42 North of SR 18 as this section is on NHS.~|~05 - 4R Maintenance - Resurfacing~|~CDFB06450A520743FBCCB17CED321E37A0F06B70 119446~|~1~|~2~|~02/SAF~|~Safety funded plan split~|~21 - Safety~|~CA50DFC40F7AA81CDE277206C1A2710A35AEA129 119183~|~1~|~1~|~01/STR~|~Plan Split for resurfacing work on CLI-72~|~05 - 4R Maintenance - Resurfacing~|~AAA49528FB137BBC93B0516A37737C286CA188BF 115046~|~1~|~1~|~01/SAF~|~Construction of traffic signal.~|~21 - Safety~|~4E5A3AB1D4DE480FDBBCE059EB15F49F91BD74A2 119062~|~1~|~1~|~01/NFA~|~All work included in this split.~|~47 - Bridge Preventive Maintenance~|~41EDEFEC9BF14B388C33A15C1EA46D30CDDD25A9 90469~|~1~|~1~|~01/CMQ/SCE~|~Construct Beeson/Freshley Roundabout CR41, SLM 5.57 to SLM 5.59, in Stark County, Ohio.~|~21 - Safety~|~45B9BA9D73513F7E85ACC420D0B36533CC0F4BBF 104050~|~1~|~1~|~01/SAE~|~Pavement marking on various routes using 100% federal 4HB7 funds.~|~21 - Safety~|~644CA43A261CB954B7DD4733A930AF25473C0D8A 96357~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~89FC9E4CC1BD5ED18FB5FCE68D70CBB39A10452B 98378~|~1~|~1~|~01/NHS/STRE~|~Resurfacing POR SR 43 from 19.76 to 20.66, urban paving in the City of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~1305E83DF73E791DBBA8BB517F2438E998DCAD2D 98378~|~1~|~2~|~02/NHS~|~100% Streetsboro items, including full and partial depth repairs, curb and gutter.~|~05 - 4R Maintenance - Resurfacing~|~AB9246EDCBB9CCFB6E0C59B26221EED5573E9A1B 102543~|~1~|~1~|~01/STR~|~Plan Split for the rural portion of the project~|~05 - 4R Maintenance - Resurfacing~|~4FEA2E6361CC2BACC46FA5BEA1A29E71AA902AD5 102543~|~1~|~2~|~02/STR~|~plan split for the bridge work items~|~13 - Bridge Rehabilitation~|~F2B39227C701BD0A5577D1ADC11065C4F4AD8EA4 96637~|~1~|~1~|~01/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~377857C4B91E0B96D756FE341F36F55A6428CE3D 96637~|~3~|~3~|~03/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~07CED0DB46D0496916DD19006A7AEA4455C26D8E 96637~|~1~|~5~|~05/SAF~|~Install median guardrail/cable barrier along MAH IR 680 from 2.06 to 3.86, and install guardrail along bridge abutment at slm 8.16.~|~21 - Safety~|~0E6765AB04A0C6F8979CB6F628731023CCB5C5AE 96637~|~3~|~4~|~04/IMS~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~08C6869B52CBAC1AB602D1B7179E12F385FAE917 96637~|~2~|~6~|~06/IMS~|~Replacement of Structure with backfill and roadway.~|~10 - Bridge Replacement~|~EF751E828FA6A1F014687894EA1DFD643E7194A9 96637~|~2~|~2~|~02/IMS~|~See linked structure.~|~13 - Bridge Rehabilitation~|~AB78EE12DA0B607AFB5791F7659388BC3F2415A9 96637~|~1~|~7~|~07/IMS~|~Emergency bridge hit repairs to MAH-680-4.66 SFN 5006864.~|~13 - Bridge Rehabilitation~|~9D59981705F5704A840F433AC3E310C0E80FD0CA 92563~|~1~|~1~|~01/STR~|~Replace retaining wall near cemetry~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~30C11AF281D5070D110732F2251B76F028A73B31 96670~|~2~|~8~|~08/S>2~|~See linked Structure > 20' span.~|~13 - Bridge Rehabilitation~|~C273E8EDE7D07F2B6F61DCAFC1ED86844A2D9031 96670~|~2~|~6~|~06/IMS~|~Bridge Maintenance to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~2FC367C070E89FF55B24E394718D950211935928 96670~|~3~|~9~|~09/IMS~|~Repairing SFN# 7705646 (SLM 6.72) backwall and approach slabs.~|~13 - Bridge Rehabilitation~|~349F7E72F4F3391AC65058D15C27700387D67E5F 96670~|~1~|~2~|~02/IMS~|~Widening portion of various structures.~|~10 - Bridge Replacement~|~ED115090D352C021BD5C33C98372099E557B660B 96670~|~2~|~4~|~04/S>2/BARB~|~100% City of Barberton Items. Full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~76AD9EC24B5B4F9ABC00970A96EDE0ACB3F2DE6C 96670~|~2~|~5~|~05/S>2/BARB~|~Resurfacing SUM SR 619 from 0.82 to 1.79 in the City of Barberton, urban paving.~|~05 - 4R Maintenance - Resurfacing~|~4E6BB383654E3032C2FAA3D3C7AB8B1E0849D835 96670~|~2~|~7~|~07/S>2~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~475D7AB98F849184C27986AA7418F8DDECEB3963 96670~|~2~|~3~|~03/S>2/BARB~|~Resurfacing of SUM SR619 from SLM 0.00 to SLM 0.66 in the City of Barberton, urban paving.~|~05 - 4R Maintenance - Resurfacing~|~EC56FCF220FD7AD6A367EE6C6DC7F64E030B5C4D 96670~|~1~|~11~|~11/IMS~|~Reconstruction portion of the linked structures.~|~10 - Bridge Replacement~|~B24A37B026D3152BE0B091B090FCDF227E4A5213 96670~|~1~|~12~|~12/BRO~|~Construction of new structure along IR-76 access road, SFN# 7705435.~|~01 - New Construction~|~2D1044340EC6F634D3DA48F9AE6532B979AD6D72 96670~|~1~|~13~|~13/IMS~|~Bridge Rehab to linked structure.~|~13 - Bridge Rehabilitation~|~BB0B64FEEC24B122DC9383C355EF8303F067B559 96670~|~1~|~1~|~01/IMS~|~Widening portion of SUM IR76. Includes waterline replacement.~|~03 - Reconstruction - Added Capacity~|~1A4A100E97CE12D77C5DB74CF324BF269FD902B5 96670~|~1~|~10~|~10/IMS~|~Reconstruction of existing IR 76. Includes waterline replacement.~|~04 - Reconstruction - No Added Capacity~|~E0A52FB28A17950E996CF4462EAA6965220AEE02 96670~|~1~|~14~|~14/NFP~|~Widening work along State/Romig associated with change order work.~|~03 - Reconstruction - Added Capacity~|~0EB67DAD6BA0F14D55A796CD20A1E046933E2111 117918~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-E~|~63 - Electric Vehicles & Charging Infrastructure~|~D52E6D37120A09C9BBFF59D99FE5987B9A33CF7B 100765~|~1~|~1~|~01/STR~|~Culvert Replacement at PIC-56-28.30~|~04 - Reconstruction - No Added Capacity~|~6CD10E9B434A94319B404B8957269F53ED1A5D7F 101056~|~1~|~6~|~06/NHS~|~Minor bridge rehab > 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~E840368C84DBE9B9B887341460DA1BDA07EB4648 101056~|~1~|~1~|~01/NHS~|~Major 2 resurfacing with extensive base repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~950CA60560450DCBBFFB2E8554F5CF3DAE3AACC0 101056~|~1~|~2~|~02/S>2~|~Major 2 resurfacing with extensive base repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~86BD1449B972470F117DFE212DC71A72959B8275 101056~|~1~|~3~|~03/STR~|~Major 2 resurfacing with extensive base repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~31AF55984C084FEA1ADE53071F05988700D0694C 101056~|~1~|~4~|~04/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F68F3F34CCBA1A6644E015A514FFC0FAC0826C29 101056~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~7E3CBBDBC88019BAB10C6E8849685025D3FD62F9 101056~|~1~|~7~|~07/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~98186B1AB6FD868F154AAE24EA1773B9C4FD632F 101056~|~1~|~8~|~08/STR~|~Minor bridge rehab > 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~C8378617F934B8E3D4F344B482E03E12DDFAF698 116934~|~1~|~1~|~01/NHS~|~Bridge Painting~|~47 - Bridge Preventive Maintenance~|~61637A6237D17EF6430DD40E41B7295178145333 116934~|~1~|~2~|~02/STR~|~Bridge Painting~|~47 - Bridge Preventive Maintenance~|~96F455D416B68196A4C8879BFAC44F99F570253D 116934~|~1~|~3~|~03/IMS~|~Bridge Painting - Interstate~|~47 - Bridge Preventive Maintenance~|~9B856DA23E01167180E83CFBAE28EE9901AFA431 110401~|~1~|~1~|~01/STR~|~Resurfacing SR 149~|~05 - 4R Maintenance - Resurfacing~|~82ABFE536DDA74BE8C90F38F3ADF02D086B4B4CD 116418~|~1~|~1~|~01/NHS~|~Reconstruction of US-20~|~04 - Reconstruction - No Added Capacity~|~BE57AE7902BF0645CE6F45B88AEE802165A0194E 116418~|~2~|~2~|~02/NHS~|~Part 2 for OPWC-funded segment.~|~04 - Reconstruction - No Added Capacity~|~A876B746B3353A7BFC9A4AE4E099B0F67DE5E8E2 97228~|~1~|~2~|~02/STR~|~Liner on BRO 68 40.91 (SFN 0801887)~|~13 - Bridge Rehabilitation~|~A28F9C12FCD8924609F762BC09D247D8DE53E1FF 97228~|~1~|~1~|~01/NHS~|~ADA SR 32 21.54~|~04 - Reconstruction - No Added Capacity~|~D0777CC931E537627613E402071B487790C0DF68 97228~|~1~|~3~|~03/STR~|~PIK 772 15.35~|~13 - Bridge Rehabilitation~|~21EE5ED2769B914C6B0327F45911F6DF79AEBB03 116281~|~1~|~1~|~01/IMS~|~Plan split to program project. Update when scope of work is complete.~|~47 - Bridge Preventive Maintenance~|~7B02A1634CD90DCF3F208EAD02895FDD32684AA3 102270~|~1~|~1~|~01/NFA~|~Ross Industrial Parkway Phase 1.~|~01 - New Construction~|~42D8A10E25F59900734A1F7CF4E4AF8117AEC0C2 107533~|~1~|~1~|~01/IMS~|~Reconstruction of BEL-70 pavement~|~04 - Reconstruction - No Added Capacity~|~F2DA80BA0E426B26F7EEF9D01E519DB96032ECF0 107533~|~1~|~2~|~02/IMS~|~Various bridge rehabilitation and maintenance work for SFNs 0702722, 0702730, 0702870, 0704830 and 0702889.~|~13 - Bridge Rehabilitation~|~BAC102A2C5CF2674AC7DEE82C6CAC0286219691B 106242~|~1~|~1~|~01/IMS~|~plans split for the resurfacing on I-71~|~05 - 4R Maintenance - Resurfacing~|~B6FFD93CC9F92BBD1D6EF0B74E350E90F19373D2 92240~|~1~|~1~|~01/BRF~|~Ravenna Rd CR12 SFN 7756046 over tinkers creek~|~10 - Bridge Replacement~|~5C2E741F24A8DD78D6AF5467B1FF97139BB97F8C 111471~|~1~|~2~|~02/S<2~|~Resurfacing in Hardin County inside of the Kenton Urban Area. Work on CR 175 from the beginning of the route at CR 160 at SLM 0.00 until the north boundary of the Kenton Urban Area at TR 110 at SLM 4.54. Federal funds from the CEAO budget with the match and overage provided by Hardin County.~|~05 - 4R Maintenance - Resurfacing~|~64D4F1876EF9109DDF9ED1D75AE4C64BA0673B55 111471~|~1~|~1~|~01/STR~|~Resurfacing in Hardin County outside of the Kenton Urban Area. Work on CR 175 from the north boundary of the Kenton Urban Area at TR 110 at SLM 4.54 north until the end of the work on CR 175. All work on CR 265 and CR 209. Federal funds from the CEAO budget with the match and overage provided by Hardin County.~|~05 - 4R Maintenance - Resurfacing~|~4B358B08B4A429EFCEA7CDE6A122A41129226DF6 111471~|~1~|~3~|~03/NFA~|~Resurfacing in Hardin County on non federal aid routes. All work on CR 190. Federal funds from the CEAO budget with the match and overage provided by Hardin County.~|~05 - 4R Maintenance - Resurfacing~|~AF350FD4342A1DB59B7F11050020251D21E56716 101020~|~1~|~2~|~02/NHS~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Spot Paving Repairs on 1) GUE - 22- 10.88 to 30.68~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3495375CFB0282291EF1C28768F5DFC071457823 101020~|~1~|~3~|~03/NFA~|~District Preservation Pavement Funds - 4PS7 (100% State) - No CAP - Spot Paving Repairs on 1) PER-757-0.30 to 5.60~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9AE2EDE4D0B4DCAF744736531EEADA06F5D47F45 101020~|~1~|~1~|~01/STR~|~District Preservation Pavement Funds - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Spot Paving Repairs on OFAH-Rural on 1) FAI-22-9.92 to 10.03, 2) FAI-22- 2.23 to 2.34, 3) FAI-664-7.55 to 12.44, 4) FAI-256-7.20 to 14.04, 5) PER-13-21.17-27.21, 6) PER-13-27.78-27.99~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A7C7C21022BA7E270774ED280F12051131D8CE9B 119813~|~1~|~1~|~01/SAF~|~Intersection/curve improvement. HOC 664 12.74.~|~21 - Safety~|~BB6E4C3936F29F6A1EA3034E34DE62D8D943A1B7 105901~|~1~|~1~|~01/S<2~|~Urban Paving in the City of Bellefontaine~|~05 - 4R Maintenance - Resurfacing~|~9C8BC96C8CABEDBAD3AE6239A2679414F24DDFA2 116250~|~1~|~1~|~01/STR~|~AC Overlay with Repairs ~|~05 - 4R Maintenance - Resurfacing~|~50CD5691CFC22592E4D72D7D1895CAD45C97ADC5 86638~|~1~|~1~|~01/STR~|~Resurfacing 3.73 to 6.22~|~05 - 4R Maintenance - Resurfacing~|~DC68239AE393F6586A0524610387228329BD2E88 86638~|~1~|~2~|~02/S<2~|~Resurfacing 6.22 to 6.96~|~05 - 4R Maintenance - Resurfacing~|~E73B1E443BC79811ACC294098A16BFFD49CDDF32 109430~|~1~|~1~|~01/MPO~|~Construction of a 10 foot wide asphalt shared use path to connect the Gilmore MetroPark Bilstein Trailhead to the existing terminus of the Miami and Erie Canal Trail at SR 4 Bypass.~|~~|~B5C90281575E205726EA7C5099B92AB6B4D18EA0 101515~|~1~|~1~|~01/NFP~|~Paint Inspection Task Order PID.~|~17 - Construction Engineering~|~56BD936B3F48DE2472E86F0DB2933451333AED64 100309~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to TRU SR 5 from 14.39 to 18.25.~|~05 - 4R Maintenance - Resurfacing~|~A803699E103D4BAFFFB5B5ECD47460397CAA0FD7 105427~|~1~|~1~|~01/S>2~|~Plan Split for all 315 Bridges~|~13 - Bridge Rehabilitation~|~D188460A29D89C8B488682E0A5DD5286136B4A7A 98194~|~1~|~1~|~01/NHS~|~Culvert replacement. HOC 78/216 Murray City. NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~907923F554E302A095DFD7570099B729A6372135 101187~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: SHE SR 65 SLM 0.00 to 5.47~|~05 - 4R Maintenance - Resurfacing~|~B3CC3D086B53917E8677E47F63CF587EF0A55E97 93952~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2017. Various routes and sections in D10. Funded 100% state.~|~21 - Safety~|~7C470DF0EE7B76D7D65AFDEB6EFEAE448A8DCF54 119665~|~1~|~1~|~01/NFP~|~Culvert replacements~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B5A8025FC7E560CD773DCC953730F2CD4FE31414 110218~|~1~|~1~|~01/NHS~|~Landslide repair project. GAL 35 14.80. NHS route funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E79E185A7A932664999A83777D1C6D54902638F6 93117~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~3C5A438D3A2CD6F8C1152FFBC3A68E09078F07D2 93117~|~1~|~2~|~02/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~9228BA4FADF9AB7CB342F7459B6EFB0D03BE1E07 121938~|~1~|~1~|~01/ERD~|~Plan Split for NAE - Reconnecting Communities & Neighborhoods Grant~|~04 - Reconstruction - No Added Capacity~|~2B139ABC88C100B9783604FBE67D0800F45F8F59 85525~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~0A96F867538FBD88C011EA14E232D9818560ABDF 108360~|~1~|~1~|~01/STR~|~ADA 770 1.90 slide repair. DSR# ADA-004~|~04 - Reconstruction - No Added Capacity~|~5A98C148D0372B5FDA916C8177B92EE156528521 97767~|~1~|~1~|~01/NFP~|~Construct new Chesterville Outpost in Morrow County~|~01 - New Construction~|~4D32A9074393EE0598D5A1E48B8C3EE28010CAE7 112464~|~1~|~1~|~01/NFA~|~Plan split for local.~|~44 - Other~|~F8E22B987A40F96E829A817FD06A13DEB3726EF4 112464~|~1~|~2~|~02/NFA~|~Plan split for transfer to MARAD.~|~44 - Other~|~33DEEEB4E2BBB52341381C58EAA874AAA3BE40FD 112464~|~1~|~3~|~03/NFA~|~Plan split for MAP.~|~44 - Other~|~A809786E3176D17447712FCCEC314D0C0E25ABFC 112464~|~1~|~4~|~04/NFA~|~Plan split for Maritime transfer of CRRSAA funds to STBG.~|~44 - Other~|~DAB05CA0637456981E02ACFB912B5A42975488C6 112464~|~1~|~5~|~05/NFA~|~Create Plan Split for transfer to MARAD~|~44 - Other~|~80515D7262037735C9AC1879FFDB6CF53F3F9831 112464~|~1~|~6~|~06/NFA~|~Create plan split for transfer to MARAD~|~44 - Other~|~DFB1DF99C89DCC658934AF3126F90C778AA06707 123752~|~1~|~1~|~01/IMS~|~Interstate plan split~|~05 - 4R Maintenance - Resurfacing~|~6A30058FAFB22B045A2418215556773FFA0257A7 113554~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~12A6CFB2F60727A248F4302F3689A67EEE14A658 22221~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~7D1D26992196B097F093534EE115A0CEDF404C0E 121656~|~1~|~1~|~01/S50~|~Replace bridge~|~10 - Bridge Replacement~|~3EE1EDC67F407A6C84A6A4BB79D075AFD557D7E8 114072~|~1~|~1~|~01/S>2~|~Local Muni local bridge funding plan split~|~10 - Bridge Replacement~|~1FE3C86F243DC5B1CF6DE6DF42DAD6145ED528C5 120807~|~1~|~1~|~01/STR~|~Crack Seal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A675DABB1E8CE2687565E9157AD1DC1B446EFAD7 99420~|~1~|~1~|~01/SAF~|~Safety funded intersection project~|~21 - Safety~|~8F0A86546FBB6A14029490FC69349B0AC1FF9A03 122489~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~5735CF4A9A394F2957C36F8CA678AE4ED22DDE34 115692~|~1~|~1~|~01/NFA~|~Miscellaneous charges for the test lab not attributed to a specific PID~|~17 - Construction Engineering~|~25792DB8490B21902A214A65B53816394C4812F6 117139~|~1~|~1~|~01/IMS~|~Plan Split for all interstate roadway work~|~~|~818C0FB3D0C5B1F520CC18EA9B1E03B220771FCA 90976~|~1~|~1~|~01/SAE~|~A safe routes to school funded project to install sidewalks in Pettisville FUL CR0000D 15-15.01~|~21 - Safety~|~E95D4B6A357C8E66AEB8E5E516CF3629E4E28D88 121465~|~1~|~1~|~01/STR~|~added plan split.~|~04 - Reconstruction - No Added Capacity~|~1FB9A7D6481C0350881001B7257E992527CD52A0 108703~|~1~|~1~|~01/S<2~|~Pavement planing, resurfacing, etc.; 95% Small City funds (4B97) and 5% City funds (LNTP).~|~05 - 4R Maintenance - Resurfacing~|~A1AAA80082A51F2B0A106F39E90F5852863C4500 110793~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~703E5E07B43CBBFB9865F301C52741BAD50C8B95 107951~|~1~|~1~|~01/NHS~|~Plan split for all work on HEN/LUC-24~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7670628C62D14184C14983B7CB49AEDD846C0C8B 124874~|~1~|~1~|~01/SAF~|~CEAO HSIP~|~21 - Safety~|~D92F950F027DF763F84F9E22B699B0AF8B3DEB9D 114855~|~1~|~1~|~01/S>2~|~Resurface rutted/shoved pavement in Miamtown.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3770C9350B6861403B6A15EC715E5663A98ECD83 86480~|~1~|~1~|~01/S>2~|~80/20 fed/local fund split for all eligible work~|~~|~15AF88D46094FF94C513E07BA06FEFBB86DC67DD 86480~|~1~|~2~|~02/SAF~|~90% Fed / 10% State participation in closing the left-hand entrance ramp from West 28th Street to SR-2 EB and redirect traffic to West 45th Street in the City of Cleveland.~|~~|~4E364835A09A00790A8D7F927E95BAABF20FBADF 103958~|~1~|~1~|~01/S>2~|~Widening on CLE CR 55~|~~|~BC21C5FDA2A03EAFD2B2A629EB0B0E9E1590C24C 122374~|~1~|~1~|~01/S>2~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~0BC2190B2A569E4009783529C878BBECE98352AA 94604~|~1~|~1~|~01/NFP~|~Long line pavement markings in Ashtabula, Mahoning, and Trumbull Counties, Ohio.~|~21 - Safety~|~A841233040E8BE9A92036376F74E346870597042 116428~|~1~|~1~|~01/IMS~|~This plan split is for the work on TUS 77.~|~21 - Safety~|~BD44B572F776C5AF0D450F15BC0A11691BF1D900 116428~|~1~|~2~|~02/NHS~|~This plan split is for the work on JEF 22.~|~21 - Safety~|~548F89F4F2F357E6EEFCD86C6E2BDAF6F3BD890F 100800~|~1~|~1~|~01/NHS~|~Rehab bridges - replace decks~|~13 - Bridge Rehabilitation~|~471671082C59F2ABB58E8B3F05D8179BEE69EDD2 102998~|~1~|~1~|~01/NHS~|~AC overlay without repairs on NHS route: MOT SR 741 SLM 3.17 to 3.61.~|~05 - 4R Maintenance - Resurfacing~|~DC39672862A28A000CAADB921C8B09C4925175B8 103033~|~1~|~2~|~02/NFP~|~Split for work on SR-528~|~47 - Bridge Preventive Maintenance~|~D351855E2DAC80F162B5C320748D4B13BBB23C95 103033~|~1~|~1~|~01/NFP~|~Split for repairs to the Detroit Rd (US-6A) bridge~|~47 - Bridge Preventive Maintenance~|~0970D102EDA0E7BD2E702E507F8504A827C365D3 93411~|~1~|~1~|~01/NFP~|~"01/NVP/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Spray Thermoplastic Striping within District 5 on IR; US; and SR~|~21 - Safety~|~08898C1D244DB39F2C6E449C027F998CFC999099 109092~|~1~|~1~|~01/NFP~|~J&C funded plans split~|~04 - Reconstruction - No Added Capacity~|~E11DE93E3562E52ADF0B1AA9CB6660B91A77D586 91658~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. WAS 339 13.64-20.44 and 20.62-24.77. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~90FF56DB67ADB2FEC82577F50C3EA9C39F48224B 108905~|~1~|~1~|~01/NFA~|~Duke Boulevard Widening.~|~01 - New Construction~|~1A3C1A668FA7F7123292398ED8E5640CC0ACD150 120199~|~1~|~1~|~01/S5K~|~Reconstruct roadway~|~04 - Reconstruction - No Added Capacity~|~C9D0C90C0B941B7D94D779AFE9356C9517E0BEEC 120199~|~1~|~2~|~02/ENH~|~Replace sidewalk, add curb bump outs, replace street lighting~|~28 - Facilities for Pedestrians & Bicycles~|~15AE6580394AC6B2DE7B75BB08E820EFF1136B12 120199~|~1~|~3~|~03/S5K~|~Urban paving~|~05 - 4R Maintenance - Resurfacing~|~2962B56B1AEDE224879FE253AADF54EA18E714DF 104656~|~1~|~1~|~01/MPO~|~See linked structure.~|~13 - Bridge Rehabilitation~|~B6D059E5AA35EAE4E25303D46813171E334967D1 101270~|~1~|~2~|~02/NHS~|~Minor bridge work >20' span.~|~13 - Bridge Rehabilitation~|~2B2AFA3EE5F5094A7929D32AD7374733D04E1DDA 101270~|~1~|~1~|~01/NHS/KENT~|~Resurfacing, urban paving in the City of Kent.~|~05 - 4R Maintenance - Resurfacing~|~6D014974346E1D9AE8D41C24BA21C5353E89960E 101270~|~1~|~3~|~03/NHS/KENT~|~100% City of Kent items such as full and partial depth repairs and curb ramps.~|~04 - Reconstruction - No Added Capacity~|~9267AC1275BC11CDC4B570E18B5B010CAE650734 98483~|~1~|~1~|~01/STR~|~District Preservation Program funds.~|~05 - 4R Maintenance - Resurfacing~|~D1B8EFE684D03C8127670AD1ACFAD323CD68E74F 119959~|~1~|~1~|~01/CMQ~|~widen Indian Ripple Road from Woodview Estate East to the Beavercreek East Corp. Line, includes curb, gutter, storm sewer and sidewalk~|~03 - Reconstruction - Added Capacity~|~889699D204EB8A4EF7B3DBCB5AA6E044BD93B57F 119959~|~1~|~2~|~02/S>2~|~includes all work associated with widening Indian Ripple from Barronwood Blvd. to Woodview East~|~04 - Reconstruction - No Added Capacity~|~E79D3F72B1F2CAEE5A6217CD17FF84E1F0BE8C46 119959~|~1~|~3~|~03/S>2~|~includes all work associated with construction of shared use path from original PID 117125~|~04 - Reconstruction - No Added Capacity~|~F786FA1D5AF1EDC93DC3A47780B856D4A18DBDF2 120978~|~1~|~1~|~01/IMS~|~Plan split TBD~|~05 - 4R Maintenance - Resurfacing~|~CB4A3FB0F2A8A0F365CEAB2ABB38538FC28647CA 105524~|~1~|~1~|~01/S<2/LIMA~|~Work on SR 65 from Fourth Street SLM 5.10 to Elm Street SLM 6.58. Work is located in the City of Lima. The 80% federal funds will be from the District Preservation Program budget SAC 4PF7. The 20% match will be provided by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~1D95D02A842CDD396DCC796B06FF6BB10FE3F574 105524~|~1~|~3~|~03/STR~|~Work in Allen County on SR 309 from the Lima Urbanized Area boundary at Thayer Road at SLM 18.19 to the Hardin County line at 25.19. Work is outside of the Lima Urbanized Area. All funds will be from the District Preservation Program budget. Three are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~052F19A2AF6086C20A7CBC6F9451F959966BB959 105524~|~1~|~4~|~04/NFP/LIMA~|~Work in the City of Lima which is funded 100% by the City of Lima.~|~44 - Other~|~A2972D9CDB602D2F96DE66545523CEBF1F52BAFE 105524~|~1~|~2~|~02/S<2~|~Work in Allen County on SR 117 from just east of Greely Chapel Road SLM 19.14 to Bowman Road SLM 19.97 and on SR 309 from Mumaugh Road SLM 17.19 to the Lima Urbanized Area boundary at Thayer Road at SLM 18.19. The work is inside the Lima Urbanized Area but outside of the City of Lima. All funds will be from the District Preservation Program budget. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~09E64188C303AA353BBA52E9E366BF3C5FB69FC7 105524~|~1~|~5~|~05/NHS~|~Work on SR 309 in Allen County that is on an NHS Intermodal Connector. The work is from the beginning of the work on SR 309 at 15.98 to Mumaugh Road at 17.19. All funds will be from the District Preservation Program budget. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~B6B6F2FDE3E6942588373754C08C7723FC9BAFBB 92787~|~1~|~1~|~01/STR/PIK~|~Prelace guardrail at the various locations listed below.PIK-CR-2 CPIKCR00002**C 0.300 to 0.640 PIK-CR-2 CPIKCR00002**C 0.870 to 1.330PIK-CR-16 CPIKCR00016**C 1.910 to 1.990PIK-CR-16 CPIKCR00016**C 2.230 to 2.320 PIK-CR-16 CPIKCR00016**C 2.500 to 2.630 PIK-CR-16 CPIKCR00016**C 2.730 to 3.150 PIK-CR-16 CPIKCR00016**C 3.450 to 3.530 PIK-CR-16 CPIKCR00016**C 3.930 to 4.050 PIK-CR-33 CPIKCR00033**C 0.650 to 0.700PIK-CR-33 CPIKCR00033**C 0.740 to 0.850 PIK-CR-33 CPIKCR00033**C 1.670 to 1.750 PIK-CR-33 CPIKCR00033**C 1.890 to 2.190 PIK-CR-34 CPIKCR00034**C 0.680 to 0.870 PIK-CR-34 CPIKCR00034**C 1.330 to 1.450PIK-CR-34 CPIKCR00034**C 1.710 to 1.890 PIK-CR-34 CPIKCR00034**C 2.700 to 2.820 PIK-CR-34 CPIKCR00034**C 3.110 to 3.360 PIK-CR-55 CPIKCR00055**C 0.360 to 0.470 PIK-CR-55 CPIKCR00055**C 0.500 to 0.680 100% Fed using CEAO funds.~|~21 - Safety~|~108F15453B7B6A3A21C6CFD41117D4822E6AE989 109647~|~1~|~1~|~01/S<2~|~Resurfacing COL-62~|~05 - 4R Maintenance - Resurfacing~|~B2E73E2CA649435E37BF9E0767F19AF0AF3FF1FA 114216~|~1~|~1~|~01/SAF~|~ROS 159 Signal Improvements.~|~21 - Safety~|~4B1C78BBD9E7CA002733D0E1FAB63D8AB891D890 114216~|~2~|~2~|~02/NFA~|~ ROS 159 Signal Improvements.~|~21 - Safety~|~04B45CB0DC626656FBD4B36351C2B460D3124A77 114388~|~1~|~1~|~01/BRO~|~Replace superstructure of bridge carrying US 40 over Wheeling Creek, CR 10 and an abandoned railroad.~|~13 - Bridge Rehabilitation~|~5C833FED95461A32B749EC4600C3263D7D875E43 120604~|~1~|~1~|~01/MPO~|~Federal items.~|~05 - 4R Maintenance - Resurfacing~|~3DC1FAADE775218096F4195C6B9A33405DD85781 101961~|~1~|~1~|~01/SAF/LCEO~|~CEAO Highway Safety Funding Program - 4HB7 (100% Federal) - See CAP Comments - Licking County project to install new or upgrade existing guardrail on various County Routes in Licking County.~|~21 - Safety~|~28F3B65951AB84B8ABB2C285DDB9F81B87407538 109806~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~F7E4B062AE27913AD52456AFC776D74075BCE5B3 87731~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~99 - State Preventative Maintenance~|~2BC9D3E0B483C4E3C234AD1151B5C57EC80CF391 104869~|~1~|~1~|~01/IMS~|~New Rest Area on Current Site~|~04 - Reconstruction - No Added Capacity~|~8BFB8BC1ACE2872962C11C9EB6738D6F07A209BA 104869~|~1~|~2~|~02/NFA~|~demolition of the Preble I-70 Westbound Rest Area.~|~01 - New Construction~|~9DEAADABE87064F2A06BE050F1F02B10B5C84033 104869~|~1~|~3~|~03/IMS~|~Revised Dog Walk~|~44 - Other~|~29F24936787A501412BDCE7E617B1713F85D661C 114697~|~1~|~1~|~01/SAF~|~Implement pedestrian safety improvements along Harrison Ave within the City of Cheviot. Improvements include a road diet, curb bump outs, RRFBs, a raised intersection, raised crosswalks, and pavement marking/signing upgrades.~|~28 - Facilities for Pedestrians & Bicycles~|~EA14E50A37B98003B29345506F2780DB9C2C569D 114775~|~1~|~1~|~01/STR~|~plan split for Rural culverts~|~04 - Reconstruction - No Added Capacity~|~0F3344846AE4A615CFACE86584E267E11C851790 104770~|~1~|~1~|~01/NFP~|~2 Year Loop Detector replacement district wide.~|~44 - Other~|~E233CDC2F7F9855EDDB98E0BD8B49F02FA7825AC 122970~|~1~|~1~|~01/MPO~|~OKI STBG Funds, 80/20 ODOT/Local~|~21 - Safety~|~34B5F1E2C1C7BB975B35D4EFE231091DB1CF3A0F 125447~|~1~|~1~|~01/IMS~|~Resurface Interstate ~|~05 - 4R Maintenance - Resurfacing~|~61B24E3CAABC7B764DED81475D33FBA3BA95AFB2 100950~|~1~|~1~|~01/NHS~|~Fine graded polymer AC overlay to ATB SR 11 from 13.94 to 22.16.~|~~|~BB4713576A4F2E96A25147244328E3B1E199D84A 99415~|~1~|~1~|~01/SAF~|~Safety funding to construct roundabout at Smothers & Schott/Red Bank~|~21 - Safety~|~42A10D7C49BAEE069AB07CD424EB8B224297BF8E 123732~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on the interstate, no added capacity~|~05 - 4R Maintenance - Resurfacing~|~BB43AB082FCDA75C8D39801AD648D93F935E0E6D 108404~|~1~|~1~|~01/SAF~|~100% State Funds for repairing void under the pavement on I-90 EB passing lane/shoulder.~|~21 - Safety~|~D0165831A7E80C8F197FEF5294D41CC181A3FC66 114053~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~53E17B553AC43F5AEBEDB8ACD79E048DDF885157 96261~|~1~|~3~|~03/S<2~|~Cost to replace the twin 60? culverts on US 127. The 80% federal funds and the 20% state match will be from the District Preservation Program.~|~04 - Reconstruction - No Added Capacity~|~48A737E53F921DEDED80594B54FB7F73DC2E1068 96261~|~1~|~1~|~01/S<2/VANW~|~This Plan Split is for road reconstruction work eligible for federal funds from the small cities program. The non-federal funds are being provided by the City of Van Wert.~|~04 - Reconstruction - No Added Capacity~|~9B856B878550FB12BD7F36AB360622C3352F23DD 96261~|~1~|~2~|~02/NFP/VANW~|~This Plan Split is for the 100% locally funded water and sanitary work that is not eligible for federal funds.~|~04 - Reconstruction - No Added Capacity~|~EABDFD4A9C3D06F0DEE252D50BD27FB8D4FE20DA 91352~|~1~|~1~|~01/BRO~|~7305796 SCI SR348 17.51 Intersect: Scioto River 80 Fed/20 State. 01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~967E078288A4C47D04DE33A3A803D3CB2FAEACBE 105619~|~1~|~1~|~01/NHS~|~General System NHS Split: DEL-23-0.00-1.58~|~05 - 4R Maintenance - Resurfacing~|~F6CE14E32AB43077F2B3679E6FD5F699733602EF 105619~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: DEL-36-8.68-8.81 & 8.83-9.04~|~05 - 4R Maintenance - Resurfacing~|~FD9ECFCBAF78FE887149879E707A3D0F052EAD1D 105619~|~1~|~3~|~03/IMS~|~Interstate Plan Split: FRA-71-28.65-29.90~|~05 - 4R Maintenance - Resurfacing~|~73E9ECEAAFCC19E71CDF6E276CBE19CB335B0C4B 105619~|~1~|~4~|~04/NHS~|~Priority System NHS Plan Split: FRA-62-8.08-8.52~|~05 - 4R Maintenance - Resurfacing~|~D40755F672D170C6DA43692219401B497DB44645 99703~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Ashtabula, Mahoning, and Trumbull Counties.~|~21 - Safety~|~1637A7A0D6E4A1CDDA9C608BC9E73B03E7756CCF 121081~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4295DAC1E8E75D6799FD8F330903E475BB408E61 123946~|~1~|~1~|~01/S>2~|~Update sidewalks & curbs~|~28 - Facilities for Pedestrians & Bicycles~|~292120B9BC928BBE60B6EF52394AE50A8880BE44 97193~|~2~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation - 4PS7 (100% State) - No CAP - Collision Damage repairs on SFN 3001687, Gue-IR 70-16.55 Not BR Eligible L=133; SD/FO = 0; SR=89.6; DSR=6;~|~13 - Bridge Rehabilitation~|~6FB422813AFDB7059649873F98EA0DA310235296 97193~|~1~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Collision repairs on: 1) SFN 4503309, Lic-IR 70-10.77 carrying IR 70 over TR 144 (Swamp Rd)~|~13 - Bridge Rehabilitation~|~8F0EA06F6CBEF856D954C28C00A142A4A77967F5 97193~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4ps7 (10% State) - No CAP - Collision repairs on: 1) SFN 3002462, Gue-IR 77-01.43 carrying IR 77 over SR 313;~|~13 - Bridge Rehabilitation~|~CAE7CBFBBF6E5887BB4FC92B6BABB287C3427431 84979~|~1~|~1~|~01/ERD~|~Streetscape improvements: Misc. curb and walk replacement, decorative lighting, streetscape trees and new signal @ Fire Station from Buck Creek Bridge to Main Street.~|~31 - Landscaping & Other Scenic Beautification~|~AB38839CCE4F3D616B24AC91649AAD863081DA2A 87279~|~1~|~1~|~01/NHS~|~BRO SR32 15.29 - 19.83 On SR32, 1.5 mile west of US62 and continue east for 4.48 miles and terminate at the Adams County line (SLM 15.29 to 19.83), it is proposed to resurface the highway with asphalt concrete.80/20 split 01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~ADC4E66291E404BC7D14EB797F6299A93FE900D4 97904~|~1~|~1~|~01/CMQ~|~Belmont Park - construction of a new asphalt bike path that will go through and around Belmont Park, connecting the park and Lohrey Recreation Center to the surrounding community and nearby bike paths. The project will also add bike racks and benches and other bike amenities that will be available for use by the riders of the proposed path.~|~28 - Facilities for Pedestrians & Bicycles~|~D7A111FE8318E22F1A7A990822E8E92C7FCC08E1 96696~|~1~|~1~|~01/NHS~|~Plan split to include all bridge work and approach roadway work necessary to rehabilitate the structure. Lighting and the City's requested aesthetic/striped paint on the fascia beams.~|~13 - Bridge Rehabilitation~|~5F3FD381BEDFCC9EF6D713BDDA70B06C3EE0253C 106085~|~1~|~2~|~02/S<2~|~Marion Urban Area Plan Split: MAR-739-6.78-7.78~|~05 - 4R Maintenance - Resurfacing~|~D59CE9E257877824EFC949DE095CBC5CDBF46F5F 106085~|~1~|~3~|~03/S<2~|~Urban Paving Plan Split, City of Marion: MAR-739-7.78-9.41~|~05 - 4R Maintenance - Resurfacing~|~652468EAAD6C9FDA658FAE7E8132127A3C12EF6B 106085~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-739-3.61-6.78~|~05 - 4R Maintenance - Resurfacing~|~0F41EF346EEC98D9B0A42762259E70B6B23AFA0A 98633~|~1~|~1~|~01/BRO~|~SFN 7501331 SHE-66-0834 - remove asphalt wearing surface and water proofing from non-composite box beam structure. Repair or replace fascia beams. Install SDC hard overlay (non-composite). Repair pier caps and encase pier columns. SFN 4601424 LOG-47-2294 Remove asphalt wering surface and water proofing and install SDC hard overlay. Encase pier columns & patch structural T-joints.~|~13 - Bridge Rehabilitation~|~618FBC211716204AE61C4456CBE5346F24CFF903 116156~|~1~|~1~|~01/STR~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~06A959C2A3101F0142B4E33CD99667110C149422 99617~|~1~|~1~|~01/NHS~|~Rehabilitate bridge COL 154 0131 (SFN 1503367) by replacing superstructure~|~13 - Bridge Rehabilitation~|~3BD6C4267F6FD1409D2C4733D6759B84E5A6A445 113479~|~1~|~1~|~01/MPO~|~Improvements include asphalt pavement repairs, asphalt milling and resurfacing, installation of trail erosion protections and installation of trail drop-off safety protections.~|~28 - Facilities for Pedestrians & Bicycles~|~2275EC30CDCD47D7802AEE5730024E7B2A17F5F1 111486~|~1~|~1~|~01/NHS/GENE~|~Resurfacing, urban paving in the city of Geneva.~|~05 - 4R Maintenance - Resurfacing~|~023EEC2E8766E0A3D1B16BDA4A13AD78E5988DF1 99436~|~1~|~1~|~01/NHS~|~Split for all pavement work for the entire project.~|~05 - 4R Maintenance - Resurfacing~|~0524CB79BF10465A0CDB21A3FC086587B4438FBB 99436~|~1~|~2~|~02/NFP~|~Work not elgible for state participation.~|~05 - 4R Maintenance - Resurfacing~|~AA8AF265358A9C7F0B3DF338FC0CC063814A46FC 102205~|~1~|~1~|~01/STR~|~LAW CR 4 5.32 ER Slide Repair.~|~~|~900E521EE2B4E8E2195EF18207835FE7BBBD91DB 88884~|~1~|~1~|~01/STR~|~Plan split for ATB US 6 from 0.00 to 1.54 and ATB US 322 from 0.00 to 8.11.~|~05 - 4R Maintenance - Resurfacing~|~F93E132E91CBF3627436DD8629FC040B00CC2A0F 88884~|~1~|~2~|~02/STR~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~D261CF2221B7965A787FDB07251E4D9499FBC27D 88884~|~1~|~3~|~03/STR~|~See linked structure 10' to 20' span.~|~13 - Bridge Rehabilitation~|~A7CBCB50865B8555B86F06DE8829732074F60987 97720~|~1~|~1~|~01/MPO~|~Resurface Munn Road using local funds.~|~05 - 4R Maintenance - Resurfacing~|~3212464B4E2E67FE78798ADFC5227820E78F7913 77727~|~1~|~1~|~01/NHS~|~Concrete deck overlay project on bridges HOC 93 12.43 (SFN 3702138). NHS route funded 80 Federal/20 State.~|~13 - Bridge Rehabilitation~|~C43A889CC4C8E98036EB7E7AF23B50F677B767EE 77727~|~1~|~2~|~02/S<2~|~Concrete deck overlay project on bridges HOC 93 12.34 (SFN 3702103). Urban federal aid funded 80 Federal/20 State.~|~13 - Bridge Rehabilitation~|~98683353F1FDC54C208272383A95FB55E0785473 105504~|~1~|~1~|~01/SAF~|~District wide pavement markings/RPMs~|~21 - Safety~|~659434F6B627D3083C9CA56E942E16C305ACF473 105504~|~1~|~2~|~02/SAF~|~Install center line rumble stripes on CLI SR 73 0.00-6.24, CLI US 22 2.62, CLI US 68 16.79-20.12, and WAR US 22 19.24.~|~21 - Safety~|~76BCBF992D0E5C10684CED67781F82F5FF3EB3BA 99691~|~1~|~1~|~01/NFP~|~Constructing road improvements to support expansion of L-3 Fuzing and Ordnance and Multi-Color Corporation.~|~~|~9B8F425513B787268890A0E549E57176025758D9 99691~|~1~|~2~|~02/NFA~|~Constructing road improvements to support expansion of L-3 Fuzing and Ordnance and Multi-Color Corporation~|~03 - Reconstruction - Added Capacity~|~BB27A3C94E9A8BE8922C0B6FF0C54D3E024BEA16 109203~|~1~|~1~|~01/NFP~|~STA Schroer Group (TSG).~|~44 - Other~|~77A006B79BE19F86F3A232D3BF8CC984494973BC 120770~|~1~|~1~|~01/BRO~|~Rehabilitate structure carrying SR 43 over Goose Creek.~|~13 - Bridge Rehabilitation~|~FA57CBF141669BDDC17E06587D2162FF87A40B93 109391~|~1~|~1~|~01/ENH~|~Plans Split for Bike Lane addation~|~28 - Facilities for Pedestrians & Bicycles~|~B36ACA26E168B7523B94D14B7AFF6D0FC2A188EC 109391~|~1~|~2~|~02/NFP~|~100% County funded~|~28 - Facilities for Pedestrians & Bicycles~|~9D3E1D31AC98041CEC674CD32C233E12FD34D92A 104284~|~1~|~1~|~01/NFP~|~Pruning Trees/Brush Removal~|~44 - Other~|~451E242DAA37FA037C6C5E12C5E7D17DA5011489 91657~|~1~|~1~|~01/NHS~|~Reconstruct and Widen US 224 in Willard~|~04 - Reconstruction - No Added Capacity~|~3537CE608A80F1C4192C2B1AF7B780C0720F323E 91657~|~2~|~2~|~02/NHS~|~100% City of Willard Items~|~04 - Reconstruction - No Added Capacity~|~CB4C69BCC8FF31FA9467009ED5EE08A0C4D2639D 118621~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV~|~05 - 4R Maintenance - Resurfacing~|~05A0C7101AB372D40EAF40D2C6841B670895BDAD 86931~|~1~|~1~|~01/STR~|~7203306 SAN SR590 1.22 Intersect: Winters Ditch~|~10 - Bridge Replacement~|~91D98747F0F45DBAC60286E564A276A3C9C6F66C 118986~|~1~|~2~|~02/NHS~|~100% local share of the project. This is for full depth pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~A8DE22E58491EC4547B49326105AC1175F5DAD9E 118986~|~1~|~1~|~01/NHS~|~Resurfacing of US 52 in New Boston.~|~05 - 4R Maintenance - Resurfacing~|~D676C19851525B0845199D057CA26A1D80E4A768 114124~|~1~|~1~|~01/NHS~|~Culvert replacement project. WAS 7 28.98 (CFN 1885082).~|~04 - Reconstruction - No Added Capacity~|~90B3E46072F5C62731619DC8AA60B553A7B473E6 106399~|~1~|~1~|~01/NHS~|~Plan Split~|~05 - 4R Maintenance - Resurfacing~|~10381F781DB97A6929651F92A3ED6BA3F9CF332A 91986~|~1~|~1~|~01/STR~|~Removal and replacement of culvert with minimum approach work on SFN 0601209 AUG 66 1704 over the Miami & Erie Canal.~|~13 - Bridge Rehabilitation~|~6FC3F65AA1E9E46325DF8BC188731B4481C80940 118754~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~3BE0B4EB1878EF3770DE492A6743A55D0C11231A 123797~|~1~|~1~|~01/S5K~|~STP 5K to 50K~|~05 - 4R Maintenance - Resurfacing~|~36DCBA5EF3724FCC9AFCF3272A5FD67B8E3631F1 123797~|~1~|~2~|~02/STR~|~workplan~|~05 - 4R Maintenance - Resurfacing~|~B4137A082914FE7ED9EBCB703354C59D6BFD75A5 106691~|~1~|~1~|~01/SAF~|~District Preservation - 100% State (4PS7) - replacement of school zone flashers within District 5.~|~21 - Safety~|~A2908AF172A10E5B32338F21289146283216AE8E 114159~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..at various locations in D10.~|~~|~57EC3B2769EA7F8AB845B30ACA7C92FE53D93021 107618~|~1~|~1~|~01/NHS~|~SCI 52 33.11 Culvert liner~|~04 - Reconstruction - No Added Capacity~|~ED77581C97E3374C8697BB8EE4B01FA5451E3CB7 118694~|~1~|~1~|~01/IMS~|~Slope repair along IR 70 EB exit and entrance ramps near SR 83 interchange.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~275F2D5C44F0478FC8D438EC0597FEC2A06B1808 121970~|~1~|~1~|~01/STR~|~All work to construct roundabout included in this split.~|~21 - Safety~|~949E2663D5C5D31A069D3C4F5F2F9AC74DA35D5A 110689~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~16874EA89497543D10B39F0F741E218D5717BF74 110689~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~9A1D28673CEF63B42B1A2D49ACD227EEAB3056FA 125218~|~1~|~1~|~01/SAF~|~Fast Dry pavement marking project throughout the District~|~21 - Safety~|~6CC4CF1FCEDE9C84649CD04988912192DD0A6E3D 113350~|~1~|~1~|~01/SAF~|~Perform hill-cut on SR 118 south of the intersection with SR 707 to increase intersection sight distance.~|~21 - Safety~|~D7F54AEEC1966A1D20FEED73C2AC20A8C5387878 93201~|~1~|~1~|~01/STR~|~General system paving of PIC-104: 0-21.47~|~05 - 4R Maintenance - Resurfacing~|~2ED28C54BD2E03F62383D1656732DE32701B8975 93201~|~1~|~2~|~02/STR~|~STP Rural bridge deck overlay 80/20 PIC-104-8.94 over Big Darby overflow~|~13 - Bridge Rehabilitation~|~63B48AE278E15AD350CDB7AF331A371DEAB34472 113505~|~1~|~1~|~01/NHS~|~Construct noise wall along TRU SR 5 from SR 45 to SLM 11.44.~|~~|~6B2B1BFBB185820A80BB416C8D35C637C20DD4F5 98539~|~1~|~1~|~01/NHS~|~Funding event for costs associated wtih the rehabiltiation of bridge HAM-27-0358 and HAM-42-0329.~|~13 - Bridge Rehabilitation~|~0791BD3941215CA4F8546700C06002A6903D399A 125050~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AB5D2014B540CB8E2BC57367EDA10EE4FB2620A3 100635~|~1~|~1~|~01/NHS~|~Microsurfacing of HAS-22 from 0.00 to 15.25 and from 18.90 to 21.68, and HAS-250 from SLM 8.02 to TR 238.~|~05 - 4R Maintenance - Resurfacing~|~154B9328978E82599F0DDA28347158BB9ABBDD9E 114733~|~1~|~1~|~01/NHS~|~FY25 Overlay.~|~05 - 4R Maintenance - Resurfacing~|~DDED4F90021F994E623D4360AD4E9C164A7F09D5 114442~|~1~|~1~|~01/NHS~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~2D219E2E2813BE845CC3CFC206BB0C249AC433E2 92534~|~1~|~1~|~01/NFP~|~Spot paving in Mahoning, Trumbull and Ashtabula counties.~|~44 - Other~|~3F8FE1F317CD4981B413211C2AAD09C103774B8A 94039~|~1~|~1~|~01/BRF~|~Bridge replacement on Structure File Number 1249681 CLA CR 314 0009.~|~10 - Bridge Replacement~|~41F4652CAE906FA4C004F597A66457700EFC0983 121876~|~1~|~1~|~01/STR~|~Slide repair north of Morrow on WAR SR 123~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7275EA43CD3AA6B618D338E2C4DC0C877B592BBE 107786~|~1~|~1~|~01/STR~|~Landslide repair project. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3F254C762110A674A3F10498F590895F1EBC9E2C 105144~|~1~|~1~|~01/IMS~|~Resurfacing POR-IR 76 from 19.34 to 21.20~|~~|~FEA5072CCDDECAD9F5007F054D194F842531DF8C 105144~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~~|~FF1CAD657E6D88AEAD3D1C6C752C8D1D29DE1F18 105144~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span.~|~~|~2C7932E207445FCAF9C6895E5EBE2A2D554853CA 116947~|~1~|~1~|~01/STR~|~AC Overlay w/ Repairs on MED-83 / Smoothseal on WAY-585~|~05 - 4R Maintenance - Resurfacing~|~760603EA7F0FBF6CABC7230197327F3ADAEEE519 116947~|~1~|~2~|~02/STR~|~Bridge Work to be completed with overlay project on SFN 5205123 MED-83-1.71~|~47 - Bridge Preventive Maintenance~|~2CFF7253520C13288589E68F950FDBF658AF0928 22937~|~1~|~1~|~01/S<2~|~Normal Project Participation with 3 funding priorities:1. D6 funding up to $5.0 M for RW & CO2. CEAO/Local (FAY Cty Eng) funding up to CEAO fed max of $2.0 M3. Local $'s (FAY Cty Eng)~|~01 - New Construction~|~93BD10AF66D81270C6D34E8890F7BD78D9D8A4A5 93130~|~1~|~1~|~01/S>2~|~Yankee Road (TR-134): from Todhunter Road to MADE Industrial Drive Project involves total roadway reconstruction and widening from two to three lanes, minor realignment of the roadway, addition of curb and gutter and storm water system, signage, and pavement markings.~|~04 - Reconstruction - No Added Capacity~|~D65C51A679EB66ADF998882AA16703592B86707B 112460~|~1~|~1~|~01/MPO~|~Split for work eligible for MPO funding~|~05 - 4R Maintenance - Resurfacing~|~E61606E20FA32FCE4CE64AE09A87FAA9AA2C6435 112460~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items not federally eligible~|~05 - 4R Maintenance - Resurfacing~|~1D34A3CDF9124B19AEE3519D172D7CD32CFFB9B0 116938~|~1~|~2~|~02/STR~|~Split for conduit work on the STP~|~04 - Reconstruction - No Added Capacity~|~F1436544D3B74844EDD420C632BF54EF2CBA8E6C 116938~|~1~|~1~|~01/NHS~|~Split for conduit work on the NHS~|~04 - Reconstruction - No Added Capacity~|~4E26F5CA395A3586C9423F913F2C95A147FFA230 116938~|~2~|~3~|~03/STR~|~Plan split for Part 2 for conduit work on US 6 in Hamden Township~|~04 - Reconstruction - No Added Capacity~|~2A31B3EF1D9F8F1F6D52DB368B776AD2513D82CF 111319~|~1~|~1~|~01/SAE~|~Guardrail project on various routes in Highland County.~|~21 - Safety~|~2F57D54F5267DF1A7C9315F7DBC1A4D2CD5F0F18 110932~|~1~|~1~|~01/ENH~|~SRTS~|~28 - Facilities for Pedestrians & Bicycles~|~55538D93B9DA64542B4E816AB278A2EC9118D9F2 119674~|~1~|~1~|~01/NFP~|~Installation of Liners~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6E39586D5DF45B4774C906713557E5BFC483D0D0 93288~|~1~|~2~|~02/ENH~|~Enhancement to bridge (SFN 4202554)~|~31 - Landscaping & Other Scenic Beautification~|~817CD9768ED98E20EBD15022F0194EEA0A86DEFB 93288~|~1~|~1~|~01/STR~|~Rehabilitation of bridge ~|~13 - Bridge Rehabilitation~|~0CD465E94E79749EB876B73CC99788616E80880E 103277~|~1~|~1~|~01/NFP~|~Replacing signs on various routes in STA and SUM Counties.~|~21 - Safety~|~15EA88C129B152E2D82673540F783312F534D260 117714~|~1~|~1~|~01/NHS~|~FRA-16-6.06 over Mason Run; Replace culvert and upgrade railing~|~04 - Reconstruction - No Added Capacity~|~6414550DE604AB3D2DF2D36E71BBC0E817DB1BD2 116088~|~1~|~1~|~01/NFP~|~Replacement of the Meigs Rest Area 10-31 as a smaller scale Gateway prototype.~|~01 - New Construction~|~BFAF3B1EA553165F9B0DC25ADB4F64BA5186CB88 97231~|~1~|~1~|~01/STR~|~ROS SR 207 4.73~|~04 - Reconstruction - No Added Capacity~|~2D62620444CBB1E69F4471AF6C033D090B3FCF43 94036~|~1~|~1~|~01/NFP~|~Thie Pleasant Valley Wildlife Area is a 1,465-acre wildlife area that lies between U.S. Route 35 and State Route 104, 3 miles northwest of Chillicothe. U.S. Route 35 lies adjacent to a portion of the area on the west side and is connected to the area by Union Lane at Pleasant Valley. The main access road is County Road 127 (Egypt Pike) off State Route 104. It is proposed to perform aggregate resurfacing and culvert repair/replacement. 100% State01/NFA/OT/State~|~~|~25514E75D308FA9CA039FC2722CCE969A6B9C49F 114822~|~1~|~2~|~02/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~02424AC070158887EBA33B9A5D9E038C3D3169FD 114822~|~1~|~1~|~01/S5K~|~STP>5,000 plan split.~|~05 - 4R Maintenance - Resurfacing~|~0291C00A311847F39CCE5A2F4AAF68140F993FD5 98183~|~1~|~1~|~01/STR~|~STP Rural resurfacing 80/20 MRW-229-0.00 to 5.30~|~05 - 4R Maintenance - Resurfacing~|~9744F41DA4F4950597227BB0B065328270D2783A 105930~|~1~|~1~|~01/MPO~|~Rehabilitationn and resurfacing work eligible for federal-aid~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~97375190D8BB8C01759A0313E0C397A95507E01D 115723~|~1~|~1~|~01/MPO/CANT~|~Construction of roundabouts on STA SR 172 at Broad Ave and Arlington Ave in the City of Canton. Includes new sidewalks, decorative light poles and landscaping.~|~04 - Reconstruction - No Added Capacity~|~22438BC4D51671552446D913F19118B701DB9615 115723~|~1~|~2~|~02/NFP/CANT~|~Waterline and sanitary sewer work.~|~43 - Utilities~|~DD94A7EE10FEC57C037A51A9402942E38B9E44F0 124000~|~1~|~1~|~01/S5K~|~Slope stabilization and repairs on the northeast side of PIC SR 316 from approximately SLM 10.000 to 10.150.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~837B01D351DF5378FD9ED4479F9CCBED02D2899E 114576~|~1~|~1~|~01/NFP~|~Added a split~|~17 - Construction Engineering~|~2A2F1CCDEBEC63CA3BC3E0ECF3B03A2C8CA24854 92532~|~1~|~1~|~01/NFP~|~Crack Sealing various interstates in D04~|~44 - Other~|~9EB79D8F313B6956826B0E8C32BC8841C5012DCD 92547~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 266 13.60-13.61. 80% Federal District preservation and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4727C798C4A4B0FC398A5AA2F4C2567E95FEEAD6 111587~|~1~|~1~|~01/MPO~|~Federally eligible items in Construction/CE~|~05 - 4R Maintenance - Resurfacing~|~4A9EA8301CEA0C66FCD79956017996853573F83A 111587~|~1~|~2~|~02/MPO~|~Plan split for the 100% local work items associated with the waterline replacement being performed as part of this proejct.~|~05 - 4R Maintenance - Resurfacing~|~483E06752BFA5074F3FC151FA0D0515D73205778 102624~|~1~|~1~|~01/NFP~|~Culverts~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7A86390777A6B38E2BBD56D754D06D3A20D3A05C 116234~|~1~|~1~|~01/NHS~|~FY28 Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~3F11FACFB17CC7975FAEDE401C4FEB924AE35D98 104819~|~1~|~1~|~01/S<2~|~Consultant Construction Inspection~|~~|~9F904A24BE4D3E0FB49737BA2C43ADB049A90877 90657~|~1~|~1~|~01/IMS~|~Bridge HAM-75-1089L is to be rehabilitated by replacing the rigid overlay, painting the structural steel, and converting to semi-integral. SFN 3110419~|~13 - Bridge Rehabilitation~|~2ED443A8403645ABEB1BAF3D1D426683DC539F36 101293~|~1~|~1~|~01/NHS~|~Split for bridge work on the NHS~|~47 - Bridge Preventive Maintenance~|~F9D07EDC1BDDE859BDA02A2776CFC140FD591F1F 101293~|~1~|~2~|~02/IMS~|~Split for bridge work on the interstate system~|~47 - Bridge Preventive Maintenance~|~9A3354448CB1D4FDCCEA0A988EDCC0A5FAC7C9CC 126572~|~1~|~1~|~01/NFA~|~Created splits for project.~|~10 - Bridge Replacement~|~D85E636695E8D1F570D76BCFE060F61435BF330E 107475~|~1~|~1~|~01/S>2~|~Federal 80%/ Local 20% Urbanized Area Inside Corp. Limit (Paving Items):Resurfacing-Urban Paving City of AvonLOR SR 0083 SLM 15.31 (Corp Limit Avon/N. Ridgeville) to SLM 17.80 (0.24 mi. south of SR 254 (Detroit Ave.))~|~05 - 4R Maintenance - Resurfacing~|~1DD7803D933B943AB1CDEAB66B112CB5A8FE6779 107475~|~1~|~2~|~02/S>2~|~100% Local (Avon):Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps etc.):LOR SR 0083 SLM 15.31 (Corp Limit Avon/N. Ridgeville) to SLM 17.80 (0.24 mi. south of SR 254 (Detroit Ave.))~|~05 - 4R Maintenance - Resurfacing~|~56DB0C2B3A54980D3D08A04CDB4FFCC8EA21E703 107475~|~1~|~3~|~03/S>2~|~Bridge: SFN 4704223 - PREVENTIVE MAINTENANCE: EXPANSION JNT REPAIR/REPLACEMENT(048)~|~13 - Bridge Rehabilitation~|~56BD26498D06350E5B9CDCC0FF1A421C1E36D2BA 96612~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 147 9.60; NOB 215 4.09; NOB 339 5.38; NOB 340 2.50, 3.30, 5.17, 5.83, 5.93; NOB 513 10.11, 10.29. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~F794CF4941AD6EF478706B0FC603983C5C3A253C 96612~|~1~|~2~|~02/NFA~|~Culvert replacement project. NOB 564 1.01, 11.15 and NOB 672 0.05. Not on any federal aid system funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~FC9B0535C94B7C655A7F86A75291523A72AD9B7B 112912~|~1~|~1~|~01/S<2~|~PIC-22 from 15.98 to 17.12~|~05 - 4R Maintenance - Resurfacing~|~518057801CC208968174FD6BF5F2FAFB773B006D 112912~|~1~|~2~|~02/STR~|~PIC-104 from 2.90 to 6.32 and 8.73 to 15.32. PIC-22 from 14.32 to 14.92.~|~05 - 4R Maintenance - Resurfacing~|~082BBD6E85184C63A8F0336AEDC0FAD3EB1EFE4B 114186~|~1~|~1~|~01/NFA~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AAB9BE7C43A6FB3716D37683C0EE5E20DFD9125A 91688~|~1~|~1~|~01/BRO~|~Replacement of the structurally deficient bridge carrying Hanes Road over the Fairground Road tributary. Work includes replacing the structure and associated in-stream work. New structure will be widened to accomodate three travel lanes, shoulders, and a sidewalk on both sides.~|~10 - Bridge Replacement~|~BEE9C5BF97184E4D455B553DDC37E5E0999B7D5B 101267~|~1~|~1~|~01/NHS/ALLI~|~Resurfacing STA SR 183 from 17.66 to 18.76, urban paving in the City of Alliance.~|~~|~501F1AE6D02153D9495A4B67755862728D0981F2 101267~|~1~|~2~|~02/ENH/ALLI~|~Streetscaping along State Route 183 near Mount Union college.~|~~|~DEEDC5918B48F825D8435CFAD21A3F8B3164FD8F 121825~|~1~|~1~|~01/NFP~|~Lab Testing in D6~|~17 - Construction Engineering~|~4D6729E70B5B81825B45DEB8DEE0ED4C4AF4FDA8 119738~|~1~|~1~|~01/SAF/FCEO~|~Installation of multi-use path and sidewalks along Refugee Road~|~21 - Safety~|~CCBDE51F9C0DD95D3C33874B4D583DDEF4354AB3 123884~|~1~|~1~|~01/IMS~|~Plan Split for bridge deck replacement on Interstate System~|~13 - Bridge Rehabilitation~|~DBD009F5FDB49EEEF0BF7E5DE3625836251812E4 95703~|~1~|~1~|~01/NHS~|~test~|~04 - Reconstruction - No Added Capacity~|~D3EF3979C3F5279475639D3F4DE30562C9055FF4 91891~|~1~|~2~|~02/NHS~|~"02/NHS/OT/ " - District Preservation Marking Pavements 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Marking of Pavements after resurfacing on Mus-SR 16-00.29 to 06.41~|~05 - 4R Maintenance - Resurfacing~|~33EC008EFA72EE1C8B79C0C7EBC32B84285DD99A 91891~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-SR 16-00.29 to 06.41~|~05 - 4R Maintenance - Resurfacing~|~554EE998B55B7F150973F256D2B634837E372591 108037~|~1~|~1~|~01/STR~|~Bridge ReplacementHUR-SR-162 02.710 SFN 3902730 (OVER MUD RUN)New Construction ? Structure(repl) (002) ~|~10 - Bridge Replacement~|~8380BD2D2073B6C4B95250F61CB7F0A4D831529D 100263~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inspection services District-wide. Estimated fee is $1.75M.~|~17 - Construction Engineering~|~8720F60D8C8DA43C476454A8F62464BAA080B448 95415~|~1~|~1~|~01/SAF/LAW~|~It is proposed, using 100% Safety CEAO Funds, to upgrade existing pavement markings on various county routes in Lawrence County.~|~21 - Safety~|~A155CAA1D27E35F4A60BA640831FF3456ED9C07C 96853~|~1~|~2~|~02/ENH~|~SRTS project--nonparticipating portion of project which includes pavement for parking and waterline replacement.~|~28 - Facilities for Pedestrians & Bicycles~|~BCD06FCFBA0BAF7A7F6E29A0AF00E6ABB77AE2F5 96853~|~1~|~1~|~01/ENH~|~SRTS infrastructure project in the Village of Loudonville; sidewalk, pavement marking and signage---80/20 Fed/State.~|~28 - Facilities for Pedestrians & Bicycles~|~DFB984E843194263B747CB7B873958964A1232BF 94740~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 17.85 (SFN 3701565). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~0A93994B932BA9D1A279B77E00314B2498F1C15E 96448~|~1~|~1~|~01/STR~|~Culvert failure to be replaced with a Type A contract.~|~04 - Reconstruction - No Added Capacity~|~F3CE55FE88C8EDC14A2C5044EF42286F5EC8C7D9 104292~|~1~|~1~|~01/NFA~|~ADA CR 2J 0.20 (SFN 0132225)ADA CR 1B 17.28 (SFN 0130060)ADA CR 10 0.14 (SFN 0136840)~|~10 - Bridge Replacement~|~0DEEABB051ABA729F1AF0BF5ADB347916C37BA85 96152~|~1~|~1~|~01/NFP~|~Construction of a new wash bay at the New Richmond Outpost in Clermont County.~|~01 - New Construction~|~6ABB26B7FEC9661A2D3B6589CF37CA672D2D5A42 100483~|~1~|~2~|~02/S<2~|~ROS 772 (13.24-15.27)~|~05 - 4R Maintenance - Resurfacing~|~4F7E9E3D3F4607D24DE0A0B6AEB1E15D956E9707 100483~|~1~|~1~|~01/STR~|~ROS 772 (10.35-13.24)~|~05 - 4R Maintenance - Resurfacing~|~C4224E30D4656557A9918130F8A9BE9A2A448517 100483~|~1~|~3~|~03/STR~|~Bridge plan split placeholder.~|~47 - Bridge Preventive Maintenance~|~7183181966762E52C008053AB0FE49191B3B6174 115748~|~1~|~1~|~01/S>2~|~Plan split for the non-NHS items on the large urban portion: SLM 6.129-6.626~|~05 - 4R Maintenance - Resurfacing~|~E3A10F71857D1B24048F924CE17BE653B38FC11A 115748~|~1~|~2~|~02/NHS~|~Plan split for the NHS portion of the project: SLM 6.626-6.91 ~|~05 - 4R Maintenance - Resurfacing~|~399AD58D5C71D08117E75D30AFD174EA8AD94786 121275~|~1~|~1~|~01/STR~|~Widen lanes and shoulders to accommodate bicycle and buggy traffic~|~21 - Safety~|~798A55E5D68E5C7B6941F3CF174268ADCE7B4B88 106428~|~1~|~1~|~01/NFA~|~Plan split~|~10 - Bridge Replacement~|~01EDCF0619510501CDA68183A46977690F6A2155 107485~|~1~|~1~|~01/CMQ~|~Plan Split~|~28 - Facilities for Pedestrians & Bicycles~|~C2F52F0997E020A4338A7D22930396C924A97A6E 93729~|~1~|~1~|~01/ERD~|~Construction of Station Park Trailhead and amenities along the TRU-Greenway Trail.~|~~|~33953955FB963AE0B2A4E7BCA7AA725581F47BDB 108735~|~1~|~1~|~01/BRF~|~JAC CR 501 0.73 (N. High St.) SFN 4061322 Bridge Replacement~|~10 - Bridge Replacement~|~2A4E4D2C20C6709110E1DB4FD76C0757347FD628 116812~|~1~|~2~|~02/S>2/WARR~|~Resurfacing, urban paving in the city of Warren.~|~05 - 4R Maintenance - Resurfacing~|~272FEDB07C45890E0D10B4E506811D29521385C6 116812~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~825B916797BCE33C55AD7A9A538E5A4D7B00C43F 116812~|~1~|~4~|~04/S>2~|~Bridge preventative maintenance~|~47 - Bridge Preventive Maintenance~|~C1F7E842A319D9AD35FFBF86761B0DA2DE660EF4 116812~|~1~|~3~|~03/S>2/WARR~|~Full and partial depth pavement repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~1E9C069807C683CC36456BA5C9177293CC342F70 107293~|~1~|~1~|~01/NFA~|~ODNR paving project in Ross Lake Wildlife Area.~|~05 - 4R Maintenance - Resurfacing~|~BB909A2F7199292723971CE9B6526E37F5A82B42 99713~|~1~|~1~|~01/NFP~|~Fence repair and maintenance along various routes in District Four.~|~44 - Other~|~F30CE54316ED7DCC3457DE41FCF17526CCE305C3 99713~|~1~|~2~|~02/NFP~|~Fencing at assorted D-4 outposts and garages throughout the District.~|~44 - Other~|~DC3B3E8A8644411E8BA57EAAA4E90D8E0265C48D 88848~|~1~|~4~|~04/NHS~|~Work on the NHS outside of the City of Kenton. Work on SR 309 from 14.40 to the CSX RR Bridge at 14.49 on the left side of the road. All funds are from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~67A712667933437B407EE77960DA64DECF0EF33F 88848~|~1~|~2~|~02/S<2~|~Work inside Urban Areas but outside the Cities. Work on SR 309 in Hardin County from Kenton Urban Area Boundary at CR 106 (13.79) to the corporation limits of the City of Kenton at 14.23 on both sides of the road. All funds are from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~4102BBA7692B1D0CE9CCCB6C59A740FF1C470F59 88848~|~1~|~1~|~01/STR~|~Work on SR 235 in Hardin County on the overlap with SR 309 SLM 14.98 to 15.98. Work on SR 309 in Hardin County from the Allen County line at 0.00 to the junction with SR 235 at 1.87 and then from the junction with SR 235 at 2.97 to the the Kenton Urban Area Boundary at CR 106 (13.79). All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~51E5F1D9F5E6495205F2869A5750979052D5B735 88848~|~1~|~5~|~05/NFA~|~Work on SR 195 in Hardin County which is a Rural Minor Collector and therefore not eligible for federal funds. Work from CR 110 at 0.00 to approximately 0.02 miles north of the south corporation limits of the Village of McGuffey at 0.98 and from approximately 0.02 miles north of W. Cottonwood Rd. at 1.04 to the north corporation limits of the Village of McGuffey at 1.52. All funds from the District Preservation Program budget no local funds~|~05 - 4R Maintenance - Resurfacing~|~9157B0A24EC02BCD2BD356F5D3156DBD90DAC628 88848~|~1~|~3~|~03/NHS/KENT~|~Work inside the City of Kenton which is in Hardin County. Work on SR 309 from 14.23 to 14.40 on both sides of the road, from 14.40 to the CSX RR Bridge at 14.49 on the right side. The federal funds are from the District Preservation Program budget. The non-federal match is provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~127BFDCBB493BCCD2FCD02313894FE8278E10DC6 110394~|~1~|~1~|~01/NHS~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~DBCD6D2CD1538300921E4F96594E6E913D88AEC3 100928~|~1~|~1~|~01/SAF~|~Replace full access intersection with RCUT.~|~21 - Safety~|~2CF81C9316604B31EE0F08A82077F1B49E1DB474 100928~|~1~|~2~|~02/NHS~|~Leroy Rd Left Turn Lanes~|~21 - Safety~|~F8015C7027FF050315B601CEB84B0C1DE9FC09B0 110331~|~1~|~1~|~01/MPO~|~Milling and resurfacing. ADA ramps that do not meet standards will be reconstructed as necessary.~|~05 - 4R Maintenance - Resurfacing~|~D5788A78E6CFDCD000D5ACB0BCD6DE65B145C77F 124755~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 562 1.82, SFN 5635101.~|~10 - Bridge Replacement~|~DE54359217D6AF9D70167A880FBB4617A86B9AC1 98558~|~1~|~1~|~01/STR~|~District Wide spot location mill & fill. Routes to be determined~|~05 - 4R Maintenance - Resurfacing~|~27EBCC1A4FD66ED315D16CFF96F06DD762E5BC5B 91871~|~1~|~2~|~02/NHS~|~Plan split for the microsurfacing portion of the project. This is between SLM 13.48-18.48~|~99 - State Preventative Maintenance~|~FC6F05786C6A5C371FC4F552733A6200D753FD1B 91871~|~1~|~1~|~01/NHS~|~Plan Split for the resurfacing with repairs on HAm-27 between SLM 11.49-13.48~|~05 - 4R Maintenance - Resurfacing~|~3CAEDE3AD593544091BC38B3ED00EF342E07FD41 91871~|~3~|~3~|~03/SAF~|~Extension of left turn lanes at Haverkos/Redskin and Stone Creek intersections; adding keep right signs; adding delineators on medians.~|~21 - Safety~|~7E6A299A7A0AE2AE47D1D6D536A8CADAC8BC028D 96727~|~1~|~1~|~01/NFA~|~Summit County Greensburg Outpost, build a permanent 12 bay garage to be shared with ODOT Summit and Stark County as well as the Stark County Engineer~|~44 - Other~|~0990D3E58A0769CE7E07734D855A94B300BD263A 119739~|~1~|~1~|~01/S5K/NLEX~|~Sidewalks and curb ramps in the Village of New Lexington. TAP Funded - Carbon Reduction / Safety $2,010,000.00 Construction Phase at 80% 4CT7/20% 4HJ7~|~28 - Facilities for Pedestrians & Bicycles~|~176E38CC305CD5486408C6C1CF49C8264502B985 107344~|~1~|~1~|~01/NFA~|~D09 Bridge Maintenance FY24.~|~47 - Bridge Preventive Maintenance~|~A6E616F823F21324352C6303D56D037970C36DF8 109469~|~1~|~2~|~02/STR~|~Chip sealing~|~05 - 4R Maintenance - Resurfacing~|~1D4E31C361342ED6E740366296B38F5881748FE5 109469~|~1~|~1~|~01/S5K~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~4677AA5F9D156CB93C9CAB05E97EBD3AB0C75B1A 118056~|~1~|~1~|~01/MPO~|~Plan Split 1 for MPO STBG funding.~|~04 - Reconstruction - No Added Capacity~|~B3DD6545F946A507C8F6E7397C8EB788BE7AA4A4 119587~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of FAY US 22 and FAY CR 68 (Jamison Rd)~|~21 - Safety~|~2C72E3A77E7C1A58B29BFCFE4CE8B61F60B125AB 89434~|~1~|~1~|~01/STR~|~REPLACE BRIDGE AND UPGRADE INTERSECTIONS SFN 1234579 CLA CR 327 6.47.~|~04 - Reconstruction - No Added Capacity~|~A9712DBA0F4E4B797A08C689F9087511AE772BA3 110767~|~1~|~1~|~01/NHS~|~GR Replacement at various Lorain County Locations~|~21 - Safety~|~2AC2C993ED51C0489C921B236FB1F0B5FAB39122 116102~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - No CAP - 80% Federal (4PF7) and 20% State (4PS7) - replacement of existing structure (SFN 6403182) carrying SR 668 over Brehm Run.~|~10 - Bridge Replacement~|~38E075F9BEFA32C25D6EF51967E96DB65197F453 110643~|~1~|~1~|~01/IMS~|~Resurfacing of STA IR 77 from 9.50 to 11.84.~|~~|~F122F0BE48BB61C3FBAE2B84A11023636D3A46E2 110643~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~~|~04229C860F44AE9B05101721603107E0F6A0B821 127042~|~1~|~1~|~01/SAF~|~SRTS funded items~|~28 - Facilities for Pedestrians & Bicycles~|~3650915AEFDA96D370921DD5078C1683DF8D999D 87862~|~1~|~1~|~01/SAF~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc.. at various locations in D-10. 80% Federal and 20% State.~|~21 - Safety~|~2623F69CA1C6E94E4BE805F5A340E97A00C6A70C 111389~|~1~|~2~|~02/S<2~|~Resurfacing project to pave gravel roads. NOB CR 20 7.44-8.19. Funded through the CEAO Program. Urban other federal aid funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~9E7946D9DF72627AA7E49C71137E2A6477071334 111389~|~1~|~3~|~03/NFA~|~Resurfacing project to pave gravel roads. NOB CR 2 0.00-4.55. Funded through the CEAO Program. ~|~05 - 4R Maintenance - Resurfacing~|~5E21666728EA8109926A26B448B91DB1DD239292 111389~|~1~|~1~|~01/STR~|~Resurfacing project to pave gravel roads. NOB CR 20 4.65-7.44. Funded through the CEAO Program. Rural other federal aid funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~8184BC0BCCCCE2685346A51A943B195CE94787F2 84459~|~1~|~1~|~01/BRF~|~SFN 7831005 Palmyra Rd CR 8 over little duck creek~|~10 - Bridge Replacement~|~70A16FDD444125C2F5ABBE0E8071839BF52D9EB7 105499~|~1~|~1~|~01/SAF~|~ADA 125 10.80-11.20~|~21 - Safety~|~DB57C56296B0D98F8326928360F001D1D7EDAFE6 117325~|~1~|~1~|~01/MPO~|~Safety feedback signs~|~28 - Facilities for Pedestrians & Bicycles~|~FB54E325379CA05349DC72D4E8B838FFA672281B 116876~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of CR7 (Plain City-Georgesville Road)/CR30 (Converse Huff Road)/CR 34 (Cemetery Pike).~|~21 - Safety~|~EF6ED493E2CA055466D88EC5F3F2175BB7A53FFB 104409~|~1~|~1~|~01/MPO~|~Installation of cantilever style dynamic message signs (DMS) on three routes in Cincinnati.~|~21 - Safety~|~202F4CF10DF1C9447CC7D8B80EB74673498A0845 110965~|~1~|~1~|~01/SAF~|~LED Signs~|~~|~B5C9BA0FE72CBC99A6590548242CCA1E46C1D121 88879~|~1~|~3~|~03/NHS~|~See linked structure.~|~13 - Bridge Rehabilitation~|~8263F3D246DB31EBAD24F49FAD895BD00CA09893 88879~|~1~|~2~|~02/S<2~|~Resurfacing ATB SR 307 from 2.32 to 3.22.~|~05 - 4R Maintenance - Resurfacing~|~83BEB77D2F114DE06F031D30CFB0FB7213E9C620 88879~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 46 from 21.83 to 21.87 and SR 307 from 0.00 to 2.32~|~05 - 4R Maintenance - Resurfacing~|~A10AF89FE0F38498FA338C2FCAAD17B9006F14F6 88879~|~1~|~5~|~05/STR~|~See linked structure between 10' and 20' span.~|~05 - 4R Maintenance - Resurfacing~|~D776F350913BF5B5DF948C7F61D296132203A96C 88879~|~1~|~4~|~04/STR~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~C457C6ECB8BE42CD17F5E4C373883BB9117CF381 121590~|~1~|~1~|~01/S>2~|~STP > 200,000~|~05 - 4R Maintenance - Resurfacing~|~F7436F130256B82D0DE707903C33E2477782A298 91042~|~1~|~1~|~01/BRO/CUY~|~80/20 fed/local split using county bridge funds.~|~10 - Bridge Replacement~|~CDE94369A2D88A1B1F7B74EE8E98679409059A84 91042~|~1~|~2~|~02/BRO~|~100% local participation on work item requested by the LPA.~|~10 - Bridge Replacement~|~D55BE00E2F72E9E09F2B0F9158FA1BE9AB49906B 119014~|~1~|~1~|~01/S50~|~Widening pavement on Breese Road as well as drainage improvements. All work in this split.~|~~|~C4C89FF9D2E60D0346EB509A29AA9882FFD7C457 113193~|~1~|~1~|~01/NFP~|~2020 OPERATIONS CHIP SEALS~|~05 - 4R Maintenance - Resurfacing~|~0A66D4C2DC4AD0102971C1829769C3DEC8FD14CA 105305~|~1~|~1~|~01/S>2~|~AC Overlay with repairs on:CLE-450 SLM 0.09 to 0.29CLE-450 SLM 0.29 to 0.38CLE-450 SLM 0.38 to 1.06~|~05 - 4R Maintenance - Resurfacing~|~001A9C544A1725177C4CB4EFFFADC9AEDF825A27 105305~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~DD1FC8C92916F3F8CAA5FB1D50CB1CF009CC4624 94185~|~1~|~1~|~01/IMS~|~Resurfacing project to hold I-75 over until the TRAC project widen the pavement. Limits are between St. Bernard to SR 4. All ramps are included.~|~05 - 4R Maintenance - Resurfacing~|~53601F462FBD7B6BC994F5367595263F07D1946B 119924~|~1~|~1~|~01/NHS~|~Federally eligible. ~|~28 - Facilities for Pedestrians & Bicycles~|~C5446ACAF5389BFBEC1DEB00A52515281971A3B2 119924~|~1~|~2~|~02/SAF~|~Plan split for 100% local items. ~|~28 - Facilities for Pedestrians & Bicycles~|~FEC3C3CFC997272C11F3D8973935E0FD8353F190 124741~|~1~|~1~|~01/SAF~|~Minor widening of CR 71 (Spring Valley Road) from SR 142 to US 42 including drainage improvements, rumble strips, and RPMs.~|~21 - Safety~|~44857D9FC335C64C8AB60B9A200DDC292DD6F03D 98803~|~1~|~1~|~01/NFP~|~Rehabilitation of Bridge No. WAR-TR 207-0002 (SFN: 8334927) which carries Strout Road over the Little Miami River.~|~13 - Bridge Rehabilitation~|~74C210B164395906CA830CDF20AC9BFA179E5C9F 108187~|~1~|~2~|~02/STR~|~DSR# BEL-002, BEL-148-17.92~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~872184DF2F472977595C2D611E2A05866F384423 108187~|~1~|~1~|~01/STR~|~DSR# BEL-003, BEL-148-17.77~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E0CF80716055CF21B8AFDECF53C1474C6B9CDB35 99377~|~1~|~1~|~01/STR~|~DAR-118-07.36/DAR-571-04.15/MER-49-06.52 - remove and replace existing culverts. SFN 1900633, DAR-47-1165, on Collett Ditch - field pave pipe invert with concrete to restore invert integrity.~|~04 - Reconstruction - No Added Capacity~|~9FECD0569A66AAB206A550BFDC0F495F601ADF04 97434~|~1~|~1~|~01/SAE~|~Upgrade of exisiting pavement markings.~|~21 - Safety~|~4CA3FDDE0538D4621047D3D99A6CA8503B501CCC 107464~|~1~|~1~|~01/NFA~|~Plan split~|~28 - Facilities for Pedestrians & Bicycles~|~B2F154373704099E1CA3D9F591E866B2707B5D81 93972~|~1~|~1~|~01/STR~|~ADA 781 2.12-10.99~|~05 - 4R Maintenance - Resurfacing~|~C685E91B9ECEADBE2CD7E82E5B1DE16B1BB15A96 93972~|~1~|~2~|~02/NFA~|~ADA 781 0.00-2.12~|~05 - 4R Maintenance - Resurfacing~|~3507DF9C094F6290644169E0CFE997346B28C541 93871~|~1~|~1~|~01/SAE/LCEO~|~"01/SAE/OT/LCEO" - Licking County pavement marking project funded at 100% up to a maximum of $150,000 with CEAO funding~|~21 - Safety~|~39DE44D434850E287B22FF5275C5077A48383348 93871~|~1~|~2~|~02/SAE/LCEO~|~"01/SAE/OT/LCEO" - Licking County pavement marking project itendtified area in classified as OFAH- Rural (.81 Mile)~|~21 - Safety~|~DAAA806D28606A85EA5DD539B53AA1E5E8FAD476 91865~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation of 4503872 LIC IR70 18.62 Intersect: Ir70 Under Tr303 Licking: BR Eligible: Length=198 SD/FO(1) SR=74.6 DSR=4~|~13 - Bridge Rehabilitation~|~521BCC6D209F08B88D2030347B9AD5CED6AA5E01 111100~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Overlaying the deck on SFN 1601423~|~13 - Bridge Rehabilitation~|~ADC8E5A0CEE08BF17F54F0D0871F015B6630B635 111666~|~1~|~1~|~01/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~3C567AE848D4A8BA113DD6557E2004CF6A1BB1D5 100897~|~1~|~1~|~01/NHS~|~BRO 52 12.49 (SFN 0801119)~|~10 - Bridge Replacement~|~0CF4F37D918329AB2FFC6A0D706755A45E96EE8D 92651~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete on MER-SR-703 SLM 8.21 to 11.13.~|~05 - 4R Maintenance - Resurfacing~|~2A08A020F250B2528882D2E82287D9FD66E46D25 92651~|~1~|~2~|~02/S<2~|~Resurface the existing roadway with asphalt concrete. MER SR 703 SLM 6.49 to 8.21 MER SR 703 SLM 11.13 to 11.23~|~05 - 4R Maintenance - Resurfacing~|~C58F3682E391753E7A3248D698B209F17D5C8C4C 120284~|~1~|~2~|~02/NHS~|~NHS plan split for bridge painting for the following bridges: SFNs 2508737, 5100453.~|~47 - Bridge Preventive Maintenance~|~4DD58D2BD0F1151D2D0C2EFD2E079ABBC7BF28AB 120284~|~1~|~1~|~01/IMS~|~Interstate plan split for bridge painting of the following bridges: SFNs 2504731, 2506203.~|~47 - Bridge Preventive Maintenance~|~5B92B1BE12C3DDA09808D0617028ED3FB016BD5C 120284~|~1~|~3~|~03/STR~|~Rural plan split for bridge painting for the following bridges: SFNs 5103517, 5102707.~|~47 - Bridge Preventive Maintenance~|~4FEB821E80632BBB9BBC16D0F2E8DC9A220BB2C1 114329~|~1~|~1~|~01/NHS~|~Split for urban paving eligible work, ie. concrete pavement repairs between the curbs excluding non-eligible work.~|~05 - 4R Maintenance - Resurfacing~|~789246B6EBB22D07BC62539B9FC82802DC47A3C7 114329~|~1~|~2~|~02/NFP~|~Split 2 for work not eligible for urban paving funds including curb replacement/repair, full depth repairs, drive aprons, and ADA ramps~|~05 - 4R Maintenance - Resurfacing~|~7F59D49A624EC8C080467EB7FEBE4EBA6961D1A9 126773~|~1~|~1~|~01/SAF/HAS~|~Pavement marking on various county routes with 100% 4HB7 CEAO Safety funds~|~21 - Safety~|~69291CB3EE8BBB3C136C85F7E0111F322628F35D 126565~|~1~|~1~|~01/S5K~|~All resurfacing work included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~B47AF3B5269C57B539FE996B2FE2D44F99BCF10C 124226~|~1~|~1~|~01/NFA~|~Added Const Plan Split 1~|~01 - New Construction~|~BF6EFBA1807F5F37FE407BAE89F2A114BEA292E0 110048~|~1~|~1~|~01/S5K~|~Resurfacing work on BUT-73~|~05 - 4R Maintenance - Resurfacing~|~9CAF5712E2A6F906A8EAD75A457A02EC27E17067 101719~|~1~|~1~|~01/S50~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-SR 37.~|~05 - 4R Maintenance - Resurfacing~|~C0299146CADE054B891DA5451E1EBD5E451DFBE5 101719~|~1~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-SR 37.~|~05 - 4R Maintenance - Resurfacing~|~107E12BBD2051A18AF0537AFE666B636141032F7 124013~|~1~|~1~|~01/MPO~|~TLCI Items~|~28 - Facilities for Pedestrians & Bicycles~|~D7B4D78FE70B5576E00CC220D56DEDB681E59F5F 93050~|~1~|~1~|~01/S<2/FIND~|~This Plan Split is for road work eligible to use federal funds from the City of Findlay STP budget.~|~05 - 4R Maintenance - Resurfacing~|~C0ADAC30168D5DFB7CE6F899B756B9A3EEF1B894 104016~|~1~|~1~|~01/ENH~|~plan split~|~28 - Facilities for Pedestrians & Bicycles~|~BCD0823E8C1240E79DA326AEAE5BB9320B9E152B 113156~|~1~|~2~|~02/NFP~|~Split for paving a lane of Cedar Rd WB from the ramp to the bridge over IR-271 at 100% local expense. ~|~05 - 4R Maintenance - Resurfacing~|~F8ADE9B3DA423986AED59349C6AD175431FB0428 113156~|~2~|~4~|~04/IMS~|~Part 2 for PID 104380 resurfacing of IR 271; north from Cedar road overpass and south in entirety.~|~05 - 4R Maintenance - Resurfacing~|~564E230CF31C6F1D90AC3DEC912C09DFB16B55A8 113156~|~1~|~1~|~01/SAF~|~Plan split for work associated with NB Safety project to modify the IR-271 NB/Cedar-Brainard interchange approach to add storage capacity and modify the northbound express lane/local lane slip ramps.~|~21 - Safety~|~3E40F47E8276AA266190F0B68653CBC6940F6667 113156~|~1~|~3~|~03/IMS~|~Plan Split for the resurfacing work along I-271 in PID 113156 in conjunction with the safety project.~|~05 - 4R Maintenance - Resurfacing~|~ABD8B46A568CF28AD8DA0CB4D11E1F8661281EB8 107252~|~1~|~1~|~01/STR~|~Construction of a left turn lane in the Village of McArthur at VIN 50 16.86. ARC funded 100% federal.~|~21 - Safety~|~B9217DC33D7C77DB8DE8F85072E68723C1191551 77355~|~1~|~1~|~01/IMS~|~priority system resurfacing of IR 70 with 1in. of Fine graded Poly. mod. Asphalt, includes pavement marking,~|~05 - 4R Maintenance - Resurfacing~|~017340465DDE54A1B56FF6C84EB502A4D5289ACF 97427~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various County roads.~|~21 - Safety~|~A30C0B94828F10FF50861117625F90C786490FC5 114727~|~1~|~1~|~01/SAF~|~District-wide raised pavement markers.~|~21 - Safety~|~8E42972E18690C61E8E91273AFEBA6263AF1A601 123455~|~1~|~1~|~01/STR~|~Resurfacing SR 43~|~05 - 4R Maintenance - Resurfacing~|~FDDEB4EC1BEEC199C9AC3F56AD641433679A52F3 120296~|~1~|~1~|~01/STR~|~Bridge replacement of LIC-79-32.19 (SFN 4505255)~|~10 - Bridge Replacement~|~8F62CF1325780F4DBC10D3711CB249FB2EBCCDE9 123224~|~1~|~1~|~01/STR~|~120' landslide repair on SR 329-13.26 mm.~|~~|~E4C34CE6362A68358B9745799D222248C49C9CD5 112372~|~1~|~1~|~01/S>2~|~Bridge Replacement~|~10 - Bridge Replacement~|~B1E3A15EE930B3B0494D1B9BAFAF7FADFABFC472 112372~|~1~|~2~|~02/S>2~|~Sanitary sewer items at 100% local costs~|~04 - Reconstruction - No Added Capacity~|~AB84BB371E6152E89F25FDAC22A17A4F8BFB1349 116993~|~1~|~1~|~01/MPO~|~Installation of roundabout ~|~21 - Safety~|~95C3F7800F4DF3658509B6390A6B2D02C1B0B45B 116993~|~1~|~2~|~02/MPO~|~Plan Split for MPO funded resurfacing on Erie St.~|~05 - 4R Maintenance - Resurfacing~|~5BCF27D16EED0C106B3AFD9B4BEB2618A2354D73 116993~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded items, such as resurfacing non-Federal aid roadway not necessary for roundabout and decorative features.~|~05 - 4R Maintenance - Resurfacing~|~0CE44EE36475D1B1660AAAE840955B3AF2133FDE 108373~|~1~|~1~|~01/S<2~|~Resurfacing in the City of Delphos. The 80% federal funds are from the District Preservation Program budget and are urban STP funds. The 20% match will be provided by the City of Delphos.~|~05 - 4R Maintenance - Resurfacing~|~9CC97A423A3574D53DFF4C4BB04D3E74E5799367 108373~|~1~|~2~|~02/CMQ~|~CMAQ eligible work for bicycles and pedestrians. 80% federal MPO-CMAQ funds. If needed, after the CMAQ funds are used MPO-STP funds can be used, The 20% match is to be provided by the City of Delphos. If all federal funds are used, funding will be provided 100% by the City of Delphos.~|~28 - Facilities for Pedestrians & Bicycles~|~4299270072C0195B905E7AE21E5170CEFCDB2EE6 108373~|~1~|~5~|~05/NFP~|~For work that will not use federal funds such as work on an unwarranted traffic signal. 100% of the funding will be provided by the City of Delphos.~|~21 - Safety~|~46F2EED383B4A49A3B3A2BE55538F72F48C6F987 108373~|~1~|~4~|~04/SAF~|~Work eligible for funding from the Safety Program. The Safety Program funds are 90% federal SAC 4HJ7 and 20% state funds. If available, after the Safety Program cap is reached MPO-STP funds can be used. If all federal funds are used, funding will be provided 100% by the City of Delphos. Work to install a road diet throughout the corridor, upgrade traffic signals, and adjust the traffic signal timings to improve traffic flow, and install side street detection to signalized intersections.~|~21 - Safety~|~E7006FC712A77FC088A5A59C5F48CDDCAD9A1314 108373~|~1~|~3~|~03/MPO~|~For work not eligible for urban paving funds or CMAQ funds. 80% federal MPO-STP funds. The 20% match and any funds needed after the cap is reached will be provided by the City of Delphos.~|~04 - Reconstruction - No Added Capacity~|~27DA3EA73A2198FD29FDFDBFF1032424C64FA5DA 121894~|~1~|~1~|~01/STR~|~Bridge replacement of COS SR 83 03.21 (SFN 1601644)~|~10 - Bridge Replacement~|~D3791409C934D19A1C2D51627FE6B45751736835 125352~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6B0DA270A0B9577A68B68C41205FDA3C86002AAC 117354~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~520464179E4844BB5B778B8C1083B26010B671F9 82645~|~1~|~1~|~01/S<2~|~Intersection Reconstruction / Widening - Turnpike State 4TK7 - NOACA Fed 4TA7/Elyria Local 4BG7~|~44 - Other~|~6518F05D1A9877AA993050C5C4A7DC7686A21F22 82645~|~1~|~2~|~02/S<2/ELR~|~100% City of Elyria Funds for Fire Hydrant and Signal Controller items~|~44 - Other~|~E7C4FE61CD26D6B101F6F3111A330379F5685364 122231~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-90-C~|~~|~A950C208E36A10089C9C690B8FC59B699971B954 90808~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete on SR 47 in Bellefontaine from County Road 21 (SLM 11.71) to Everett Street (SLM 12.91).~|~05 - 4R Maintenance - Resurfacing~|~D8FBEA903245EA2F4CC3D640848DD0D344689337 111484~|~1~|~1~|~01/SAF~|~Guardrail replacement on various county routes with 100% CEAO Safety funding (4HB7).~|~21 - Safety~|~41FE3C105FC7ECC6F00354DB517BF5C1CC3CE6CC 102462~|~1~|~1~|~01/IMS~|~To upgrade the existing signing along IR 70 and IR 77 in Belmont and Tuscarawas counties.~|~21 - Safety~|~29BC79D15216B4E655A946EFED98DA6F61F64BC7 97541~|~1~|~1~|~01/STR~|~Ohio Bridge Partnership Program. Congress Rd over a branch of East Branch of the Black River~|~10 - Bridge Replacement~|~2A7A6864B79CCDEC7F5EAFFFED1B569B914ADE79 97541~|~1~|~2~|~02/STR~|~Ohio Bridge Partnership Program, Seville Rd over Camel Creek~|~10 - Bridge Replacement~|~8827C8B3120A974D65C30A7E957C068FFDEB0FD9 110118~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 550 3.31.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E7FCF5A4DBCEFEED51047E73C821205E14050B2 90254~|~1~|~1~|~01/SAF~|~Ross County pavement marking project on various routes.100% Fed per CEAO~|~21 - Safety~|~A2FDFD43EE87B129FC7072E6FA9E1009B78153A9 114516~|~1~|~1~|~01/BRO~|~Split for deck replacement over Lee Road~|~13 - Bridge Rehabilitation~|~CFEEF29A3E8E8C59473284EF658E7AC209AB30A5 114516~|~1~|~2~|~02/SAF~|~Safety speed enforcement~|~21 - Safety~|~B5A11FC097B2F5BC6EB42A3C9DE6BA8D023FE2B2 113891~|~1~|~1~|~01/STR~|~FDR MED 57 03.49 to 8.82.~|~04 - Reconstruction - No Added Capacity~|~8B737907B092593580579EEBC365505DEE233571 113891~|~1~|~2~|~02/S>2~|~FDR MED 57 8.82 to 10.39.~|~04 - Reconstruction - No Added Capacity~|~0490E62E26A8D29330D8A43B44A0B82E2932879B 113891~|~1~|~3~|~03/STR~|~Bridge Rehabilitation to be completed along with the FDR Major Rehabilitation project.~|~13 - Bridge Rehabilitation~|~48ADF5C69BC5BF35CA633DFB51943269AFDF3974 113891~|~1~|~5~|~05/IMS~|~Bridge Rehabilitation to be completed at MED-57 over IR 71 bridge along with the FDR Major Rehabilitation project.~|~13 - Bridge Rehabilitation~|~3D750FE6ABE4DA4C76D8E12B87499EC5FDBE6F40 113891~|~1~|~4~|~04/STR~|~Culvert Rehabilitation and Repairs to be completed along with the FDR Major Rehabilitation project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7FB4BC50CF6E0E5085EC788DCFD88DAD75916A97 113891~|~1~|~6~|~06/STR~|~Culvert Replacements to be completed along with the FDR Major Rehabilitation project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CACCAB943FBB02FC3FA2F294FC98A4232A14F374 97317~|~1~|~1~|~01/STR~|~ROS CR VAR RPM FY19~|~21 - Safety~|~B79EEF7355D29CEC23AC87B1980C2325C88C6ECA 126729~|~1~|~1~|~01/BRF/TRCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~6ED100325B9F603ACC7E0215DC962B773CBF7CD7 81142~|~1~|~1~|~01/BRF~|~CEAO BR projectReplace bridge on MAR-CR141/Saint James Road over Olentangy RiverLocal Sponsor - MAR County Engingeer5132428 MAR CR141 0.4 Intersect: Br Over Olentangy River~|~10 - Bridge Replacement~|~29CC38628B4FF45192E59FB8085E42EFC9A95B96 16987~|~1~|~3~|~03/S<2~|~Urban area and urban/Marysville system (fed/local) pavingUNI-736: 7.95-8.4103/S<2/PV/F_LC~|~05 - 4R Maintenance - Resurfacing~|~8CC9CE57A9C8222072AAD02C0989DFA8007D7770 16987~|~1~|~4~|~04/STR~|~Minor work (sealing, patching, asphalt OL) on 5 bridges8003068 UNI SR736 0.62 Intersect: Robinson Run8003165 UNI SR736 2.65 Intersect: Miller Ditch8003181 UNI SR736 3 Intersect: Adams Run8003211 UNI SR736 4.08 Intersect: Blumenschein Ditch8003238 UNI SR736 7.42 Intersect: Over Bishop Ditch~|~05 - 4R Maintenance - Resurfacing~|~B4E4895C524DE7F5D72E779BB2302E895A2E0C45 16987~|~1~|~1~|~01/STR~|~Rural area and general system (fed/state) pavingUNI-736: 0.00-7.8201/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~E2647BBCAD29BECAEB01651EFD01F7DD13187BFC 16987~|~1~|~2~|~02/S<2~|~Urban/Marysville area and general system (fed/state) pavingUNI-736: 7.82-7.9502/S<2/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~F9A4D5EAA62270BB454619F006D4CA27FD4999DE 116611~|~1~|~1~|~01/STR~|~Pavement Markings~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2709D9198A41A3039898AECFC3C2C200025BC17C 125537~|~1~|~1~|~01/SAF~|~Primary Safety plan split.~|~21 - Safety~|~98E018A7DDDE0EF5C7FEC9FF83B0C1D717CC557C 107531~|~1~|~2~|~02/S5K~|~Asphalt resurfacing within the City of New Philadelphia~|~05 - 4R Maintenance - Resurfacing~|~6627AD0DB8B4B241551A2F70C7F89CCA0F78991E 107531~|~1~|~3~|~03/S5K~|~100% City funded items~|~05 - 4R Maintenance - Resurfacing~|~C8C8B17E52BE0E73F419D1D9B44B1D90277091D4 107531~|~1~|~1~|~01/S5K~|~Resurfacing TUS-259 where the roadway is not entirely within the New Philadelphia corp limits~|~05 - 4R Maintenance - Resurfacing~|~FCAF051D0ABD38089017992ECE5DB464B220A2C3 105041~|~1~|~1~|~01/NFP~|~Raised Pavement Marker (RPM) contract for FY2023.~|~21 - Safety~|~2F21BC03883E1570C0DF1F4B680F7DAF32939035 107866~|~1~|~1~|~01/CMQ~|~Widen SB South Gilmore/Winton Road for an additional through lane between Omniplex Drive and Ramp Y, convert existing SB right turn at Omniplex Drive into a through/right, and widen Ramp Y for an additional WB lane.~|~03 - Reconstruction - Added Capacity~|~AD611C723297245FD51C6127218B0E817E7D0648 107176~|~1~|~1~|~01/NFA~|~Motor paving ATH CR 73 (Wolfe Bennett Road). Total of 3.52 miles. FLAP funded. Not on any federal aid system funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~72F881FAC3DD259BD63DB4D801CD2DE2B17B648E 116863~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~59EE710955200A7E1133300BB64A12D019CAFBB5 122595~|~1~|~1~|~01/ERD~|~Stabilize upper portion of existing retaining wall and replace inadequate and failing guardrail with a combination vehicle/bicycle railing.~|~66 - Resilience Improvement - Highway Project ~|~B51B4401F1067EF815BE052B5A339BFEC1EA8EA8 82435~|~1~|~1~|~01/NHS~|~Resurface the existing roadway with asphalt concrete and other roadway related items on AUG-US-33~|~05 - 4R Maintenance - Resurfacing~|~B2C4ACFA16D7861012B59FC4C0842770F5BA59C2 117969~|~1~|~1~|~01/STR~|~Rehabilitation of PER SR 345 6.49 (SFN 6402666).~|~13 - Bridge Rehabilitation~|~C248D5123C702620F777E09256535EBA27B12E05 99567~|~1~|~1~|~01/NHS~|~US-20 from 0 to 27.912~|~05 - 4R Maintenance - Resurfacing~|~8D5DAB28540371CED70CC54C879CCA7BBF8C8732 25227~|~1~|~1~|~01/STR~|~Culvert replacement of structure over branch of the Ashtabula River SFN 0400548~|~10 - Bridge Replacement~|~46F4D403790A4A0F9C44EA0560F6431BC25CE88F 108418~|~1~|~1~|~01/S>2~|~Mill and fill in the City of Huber Heights. MOT SR 201 SLM 4.36 to 6.00~|~05 - 4R Maintenance - Resurfacing~|~AEDD756958D7DB7C30D52291BCCE28C67FF43F45 98226~|~1~|~1~|~01/NFP~|~Plan Split for D05 CS FY2025 - 100% State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EA983DF677E58141F18BFCBA8122F4B8E81BF2B6 82264~|~1~|~1~|~01/NHS~|~Sign Replacement~|~21 - Safety~|~4F65223117C2C794DB10A78A76A8A0BB4CD39971 117057~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing.~|~~|~059F68E5A3A24B66F7DD66B5C600FAB9D2E7E402 82919~|~1~|~4~|~04/NHS~|~Plan Split for SFN# 6703755, POR US 224 01.05, over the Wheeling Lake Erie railroad, Suffield Township, Portage County, Ohio.~|~13 - Bridge Rehabilitation~|~172AAFE1DACB09E4F02E2C9E5C048642EE3CBAC7 82919~|~2~|~6~|~06/BRO~|~Plan Split for SFN# 6703879 POR US-224 07.14 over Congress Lake Outlet, Randolph Township, Portage County, Ohio.~|~13 - Bridge Rehabilitation~|~1DB8C8901A1573699BDF531971D2E4005B8552B9 82919~|~1~|~2~|~02/NHS~|~Resurfacing of US-224 from SLM 0.00 to SLM 2.42, in Suffield Township, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~70F6BD2252C094A35DF9B39A468AC739852BAF0A 82919~|~1~|~1~|~01/STR~|~Resurfacing of US-224 from SLM 3.85 to SLM 12.99, in Suffield, Randolph, and Atwater Townships, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~8820A93B9E6AC9BFE5B51A246D97513827E0D3A4 82919~|~1~|~3~|~03/S>2~|~Resurfacing of US-224 from SLM 2.42 to SLM 3.85, Suffield Township, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~EE7447EB567D005AB9E83777C565177DC269DDCB 82919~|~1~|~5~|~05/STR~|~Plan Split for SFN 6703844 POR US 224 08.31, SFN 6703909 POR US 224 11.71, SFN 6703933 POR US 224 11.89.~|~13 - Bridge Rehabilitation~|~F5FCA00EE27ECAA7BFAA488DB5BAD3C00F7F0210 95975~|~1~|~1~|~01/NFP~|~Demolish old salt domes. Build new salt building. 4000 ton cap.~|~~|~485BFC63E4CDB3DDE81229F44F0C7BCC92EC5765 82825~|~1~|~4~|~04/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 78 2.29-3.73 and HOC 78 0.00-3.32. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~64E18C8809763BCED43646C05494F1C2ED9C9DA1 82825~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 78 1.97-2.29. NHS route in the City of Nelsonville funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~79D3DA98C9A1D5CB60A953539E7B594084BF95E3 82825~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 78 4.00-8.73, 9.75-11.20, and HOC 216 0.10-4.68. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~AB25EDFA69D337D4780DCC2DCD40D91A5BD06608 82825~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 78 3.73-4.00 and HOC 216 0.00-0.10. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C1BB5A3280EFB0A2BCABAA4217AB643FA0AB879B 93590~|~1~|~1~|~01/BRO~|~Provide a new MSC overlay on bridge BEL-7-0685 (SFN 0700274). Remove the existing MSC overlay using hydrodemolition~|~13 - Bridge Rehabilitation~|~A94D8A94B4A22D5ADF539EC4EDD21CD6D56EF69E 90576~|~1~|~1~|~01/NFP~|~This is a guardrail contract using maintenance operating funds.~|~04 - Reconstruction - No Added Capacity~|~E1B81D500C630AFC5F8B965A4417CE9DBA5CB7F8 117737~|~1~|~1~|~01/BRF~|~BFP - CEAO funding for bridge rehab~|~13 - Bridge Rehabilitation~|~7F128BE59A276B1199ACB4006ADF2FAB48D4C22F 95878~|~1~|~1~|~01/NFP~|~Culvert work plan split: 430440615~|~44 - Other~|~65486CA5E4947F674C4DC6CF1DFDD73DC30B3C1E 100643~|~1~|~2~|~02/S5K~|~plan split for work in the Small Urban section:CLI-134: SLM 10.58-11.95CLI-134: SLM 15.21-15.52~|~05 - 4R Maintenance - Resurfacing~|~4D092D7BCFD4DF449ED7AF973229E5197C0BB4E0 100643~|~1~|~3~|~03/NFA~|~Plan split for work on CR 1 inside the Village of Port William between the end of CLI-134 and the bridge over Anderson Fork~|~05 - 4R Maintenance - Resurfacing~|~2DCF9EB09DFEE804404D942C5817C5A569CD48C9 100643~|~1~|~1~|~01/STR~|~plan split for roadway work in the Rural sections:CLI-134: SLM 7.53-10.58CLI-134: SLM 15.52-22.08~|~05 - 4R Maintenance - Resurfacing~|~090607F4D11EB2E4C37433BF26393B37A60879D5 114136~|~1~|~1~|~01/NFP~|~CE funding~|~17 - Construction Engineering~|~1D431004CC723371A4AC21DEFD5FE33CE31FD523 100246~|~1~|~1~|~01/MPO~|~Repair and resurface SR-91 using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~47F46280F145BEC448F85BF2434582C58D5E63EA 111565~|~1~|~1~|~01/BRF~|~Muni-Bridge funded items~|~10 - Bridge Replacement~|~2432D53682CDA2E6C384E5967F8909D265843B7E 125488~|~1~|~1~|~01/MPO~|~installation of ped crossing at intersection of Branch Hill Guinea Pike and Loveland Miamiville Rd~|~28 - Facilities for Pedestrians & Bicycles~|~5FD59AED039C8BF93FAD83735D6AC44877E9F039 123655~|~1~|~1~|~01/S>2~|~Plan split for pavement preventative maintenance contract on various routes throughout the district, classification to be determined when roadway segments identified.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9CD4E7714C18D3B3FD115307C85C3D35EBFC2167 114612~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance~|~17 - Construction Engineering~|~F5B7BE22009877CB8893A78FD306FCF7CA648069 95580~|~1~|~1~|~01/IMS~|~Bridge Rehabilitation - MED-071-01.39~|~13 - Bridge Rehabilitation~|~8278EA4FF12E99FAE724F8F98C659F18A5BF40D7 126614~|~1~|~1~|~01/BRO~|~Replace superstructure on bridge carrying US 62 over McFarland Run~|~10 - Bridge Replacement~|~4CD143F546711BDF30E3C05A17FF928C187EFD09 110375~|~1~|~1~|~01/SAF~|~All work on SR 29 & SR 38 to construct the roundabout except for the work on structure MAD-38-21.52~|~21 - Safety~|~23536ADF967F5B1EBD41C36ABB04BDFFC88E9192 110375~|~1~|~2~|~02/SAF~|~Lengthen MAD SR 38-2153 culvert~|~21 - Safety~|~E0E8D6FB149045B871C0CFA8AF657BAECE536431 87697~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~F903371CF0D6AE6F5D2A6A2D1632D41D831F08F7 107749~|~1~|~1~|~01/NHS~|~Covers all work to rehab bridge.~|~13 - Bridge Rehabilitation~|~AC6E6DDB4B7510B6437495F131BEAADD709813A9 98356~|~1~|~1~|~01/S>2~|~Demolition of building.~|~44 - Other~|~7FA495098A06C2DCC21DCE1DBFBD6B54E70A7033 126078~|~1~|~1~|~01/STR~|~STP rural PS~|~05 - 4R Maintenance - Resurfacing~|~B2A899CAE1E00DC3704BC6E946C66F96592BB99B 94970~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~~|~AA3FC81425AC039853B215B33A18748E43080051 99375~|~1~|~1~|~01/S<2~|~SFN5504198, MIA-571-0661, on Stillwater River - 1. Restore expansion joint system at abutments. 2. Correct erosion to embankment on rear left and rear right ends. 3. Refurbish and reset abutment rocker bearings.~|~13 - Bridge Rehabilitation~|~D583D70B7FA771D1EFA4DB2F2E8F575958B208A6 99375~|~1~|~2~|~02/STR~|~Remove asphalt wearing surface and waterproofing from non-composite box beam bridge and place new non-composite SDC hard overlay for the wearing surface. Patch rear abutment backwall. Seal concrete surfaces with epoxy urethane.~|~13 - Bridge Rehabilitation~|~CE84A833BE8868B8E80CD97DFE164DEF6DDB9035 125511~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~1C04F9A181662873147015E68E07BD4BDAF7AC80 115797~|~1~|~2~|~02/SAE~|~Multi-Use Path along 161 from Ambleside/Satinwood Drive to Maple Canyon Ave~|~21 - Safety~|~6DE3DDC596EAF82EA48FEF15AE018BCFD0651495 115797~|~1~|~1~|~01/S>2~|~Roundabouts on Sharon Woods Blvd/Tamarak Blvd, and Beechcroft north & south of 161, resurfacing of service roads and traffic signal work.~|~21 - Safety~|~14E779242B6674A0DB4718DCF727B2569790CB1D 95194~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 556 9.37. Emergency A project. Rural other federal aid funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D4AC05DF3BDB9CCD1908D55F431B73E37ED44465 100010~|~1~|~1~|~01/NFP~|~Rehabilitation and resurfacing of various roads and parking areas within Winton Woods Park.~|~04 - Reconstruction - No Added Capacity~|~0DC244930E9BD0A86D681D9474379F2307D9A36B 89721~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work eligible for MPO enhancement funds.~|~28 - Facilities for Pedestrians & Bicycles~|~6170127BCD7EAE30E26B70915016B71A56965D0F 89721~|~1~|~2~|~02/ENH~|~100% local items not eligible for enhancement funding or cost of the project has exceeded the capped funds therefore locals will pick-up the rest of the cost.~|~17 - Construction Engineering~|~84D237A133334799DF4D79091F4B34331585A0FB 102055~|~1~|~1~|~01/STR~|~Park & Ride area including, fencing, lighting and drainage.~|~44 - Other~|~46707728D196974C5CFA67EEF7467D930CC405F2 109337~|~1~|~1~|~01/NHS~|~Culvert replacement BEL-7-9.79.~|~04 - Reconstruction - No Added Capacity~|~0BA8A6CAC3A4E9434AD325B0D75CA3941E5B282D 95739~|~1~|~1~|~01/STR~|~HEN-108 from SLM 0.00 to SLM 5.94~|~04 - Reconstruction - No Added Capacity~|~FB9C51F8C1CCEFBB650ABC8F4295D018000FEE02 95739~|~1~|~2~|~02/BRO~|~Bridge Plan split for Hen-108-0412~|~13 - Bridge Rehabilitation~|~2486D9287E7570B36FE6BBA29C3522BCAF701737 93620~|~1~|~1~|~01/ENH~|~BRO Mt. Orab SRTS Boyd Road - Safe Routes to School It is proposed to construct new side walks alongy Boyd Road in the Village of Mt. Orab using SRTS funds. 100% Fed 01/ENH/OT/Mt. Orab~|~21 - Safety~|~18546A52FEBD6087CB707562F2372FCBD9168D50 97353~|~1~|~1~|~01/NFP~|~Adding to phase change~|~04 - Reconstruction - No Added Capacity~|~FECEF617AF08FEBE1D921963309AECB6BDD065CD 108326~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MRG 266 3.30. DSR MRG-006. Rural other federal aid funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~72FBC3B8A396900A56A3A46E1A8DACAE866235F4 102777~|~1~|~1~|~01/IMS~|~Highway Lighting Maintenance Contract D07 2018-2019~|~44 - Other~|~B3687BFD4620AD7378297BF6287F0DAFFD73B28B 102777~|~1~|~2~|~02/IMS~|~Highway Lighting Maintenance D08 2018-2019~|~44 - Other~|~97BA1BE44C7A934E7B4D54AB3C81E250C3023010 99202~|~1~|~1~|~01/SAF~|~All work eligible for federal funding for this project.~|~21 - Safety~|~D7F3503E4E31BA7B5D65AF19B0942763C7A05E4E 100494~|~1~|~1~|~01/NHS~|~PIK 32 (19.92-28.42)~|~05 - 4R Maintenance - Resurfacing~|~DB66B684BA46041494954560FB7167E0E83FE252 89386~|~1~|~1~|~01/S<2~|~SCI SR823, Building Demo It is proposed to demolish various buildings on the Portsmouth ByPass. Reference this PID to PID 19415. STIP referecne number is 2237 whcih is also on PID 19415. Also, the environmental clearance is coverd under PID 19415. PID 19415 is Phase 1 of the Portsmouth ByPass. 80/20 split01/S<2/OT/State~|~44 - Other~|~35F41A0FA75F2028C92D4363557D917A56EC47C1 97684~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 53.33. GSM funded. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9284DCB6050CA2F3CBDEFD725F1F34234390A3A7 97684~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MEG 124 45.80-62.33. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~8F603C9F0F7DEAB76194CD507620FEEF534786E0 97684~|~1~|~3~|~03/NFA~|~Resurfacing of the Meigs County Garage parking lot.~|~05 - 4R Maintenance - Resurfacing~|~E656C4088F9248B0554498C29079C5E8AB6C53B7 115594~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~11E33966B7C0273FFAC74C9083A2F9423610079E 87721~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~BAEA8F97DADB1655D468D499DE7AF9DA6E707F9F 87721~|~2~|~2~|~02/IMS~|~Bridge Work~|~13 - Bridge Rehabilitation~|~1806CC52CB1A212F18EEC72842B95C17FCDAEE4B 119415~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~195D1BE90F8AA528B8AD5DDECD48D0C9B6D81FA3 121420~|~1~|~1~|~01/NHS~|~Plan split for NHS portion of SAN-20~|~05 - 4R Maintenance - Resurfacing~|~A8E05CD225D9CA3D330BCFDACC499B9A62C95044 93824~|~1~|~1~|~01/STR~|~Encase the piers on GAL SR 325 15.91 (SFN 2703696). Bridge repair project. VIN 327 10.18 (SFN 8202281). Pile encasements. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~82BF7E03D9F4AF321D8631E0D4D82DFAC7C87611 104870~|~1~|~2~|~02/IMS~|~Build new rest are on current site - IR 71 SB~|~~|~BD91AA64030B78001AA84A00A6B016EC279F8BE5 104870~|~1~|~1~|~01/IMS~|~Build new rest area on Current Site - IR 71 NB~|~44 - Other~|~FA00F8DB82E6FF6AFAED23E0773B42278A8DA296 104870~|~1~|~3~|~03/NFP~|~Work to be performed at the NB 71 rest area at the Governor's request.~|~31 - Landscaping & Other Scenic Beautification~|~1560F84CA2CFCDBFD3556A1CD2920BA79CAA23FF 125480~|~1~|~1~|~01/NFA~|~Pruning.~|~44 - Other~|~C4C8DAC51FCA4D8D72E4C322BCAEDAEAA806F534 75610~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~AFFE92F60404E78247EDD70BADBFFCB1C2C97371 86719~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation - No CAP - 100% 4PS7/0005 for hauling of RAP from the project.~|~05 - 4R Maintenance - Resurfacing~|~2A359D24E7DE1AF747C8890BC70B0815F35F5EAE 86719~|~1~|~2~|~02/ENH~|~"02/ENH/PV/ " - Transportation Enhancment Funds (SAC 4B37) Capped at $264,000.00 which is the 80% share for CO and CE sub-phases - for the replacement of sidewalks and catch basins along SR 60 between the 08.15 and the 08.86 mile markers.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6CF15821FA45E35A8071AFF74E195B9A3A0E3809 86719~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation Funding - No CAP's - Resurfacing - Mus-SR 60-08.03 to 08.86 - Treatment consists of Full/Partial Depth Repairs, 2" Mill; 3/4" intermediate course; 1-1/4" surface course~|~05 - 4R Maintenance - Resurfacing~|~E588858B0F8987AC2AE5AFE9A1D76A01E3C10189 97873~|~1~|~1~|~01/NFA~|~Fulton County Garage.~|~44 - Other~|~35A526258A642DFFB3A9AD21A09ABB20027FA4FB 124991~|~1~|~1~|~01/CMQ~|~MPO CMAQ Funding~|~21 - Safety~|~2EDECC28EBFF456A22E5C6F46A90CADA4535463B 110381~|~1~|~1~|~01/S<2~|~Landslide repair project. MEG Mill Street (CR 5) 0.35, in the Village of Middleport. DSR MEG-001. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7019DFA988BE6ECA4E12265EF9A01F53A55BC28 119982~|~1~|~1~|~01/MPO~|~MVRPC carbon reduction (CR) program construction funds awarded at a 22% match.~|~28 - Facilities for Pedestrians & Bicycles~|~4EA21041EAFEAF175BB273BBA592A80F35FD8D62 101696~|~1~|~1~|~01/STR~|~Resurfacing along US 62 and SR 205 in Knox County.~|~05 - 4R Maintenance - Resurfacing~|~07FC6C3EBCD09F07090BB89BEE804E29ABE3E92F 101886~|~1~|~1~|~01/CMQ~|~Installation of fiber optic interconnect cable, upgrading signals to LED technology, installation of new signal controllers, and implementation of new signal timing in City of Cincinnati traffic signal Zone 9.~|~21 - Safety~|~EEF354D9728CFC842FA10774440A4A2375898D58 96952~|~1~|~1~|~01/NHS~|~80% federal /20% state using Major New funds to install approximately 1400-ft of noise wall along westbound SR-2 near Hendricks Road.~|~44 - Other~|~B25EE096E7284FB7CE7C4B90EE9386BF7F740768 101974~|~1~|~1~|~01/SAE~|~100% HSIP funding from the CEAO up to the cap. The amount over the cap will be provided by Putnam County. All the federal funds will be used in the Construction Contract subphase. The County is not currently seeking cost recovery for Construction Engineering costs.~|~21 - Safety~|~4EF5AE1B05C5E4C772F61D5753D037710B3E989A 101753~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - Plan split 1~|~05 - 4R Maintenance - Resurfacing~|~C0B479E61BAA4DF34AAA9C41C8FE7607FBD9F333 101753~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - Plan Split 2~|~05 - 4R Maintenance - Resurfacing~|~C78C02260C66718C226C18A7CF502D3617F0A313 110799~|~1~|~1~|~01/SAF~|~Improvements to FRA SR 3 from Agler Rd to Oakland Park Ave to improve safety and congestion~|~21 - Safety~|~ABAF08BD1A81FEBBCBFF55EABD9CE89202B6B839 103332~|~1~|~1~|~01/S<2~|~Mill and fill - UPP~|~05 - 4R Maintenance - Resurfacing~|~CFB6D40B4C0228B4C045D9DEE8F4372C8DBF4E5E 103332~|~1~|~2~|~02/NHS~|~Mill and fill - UPP~|~05 - 4R Maintenance - Resurfacing~|~BE4084635C467CE9D77ACBDADB1968AD00A07E6D 107182~|~1~|~1~|~01/NFA~|~Corrections to the Thornwood Drive on both sides of the railroad crossing. Improvements will include Engineering Design, ROW, pavement repairs, asphalt surfacing, drainage improvements, shoulder widening and other ancillary items.~|~01 - New Construction~|~C9399CD6EE9F63AD552EA8293619FCB893D955B3 96561~|~1~|~1~|~01/STR~|~Resurfacing POR SR 88 from 2.54 to 4.02 and Resurfacing POR SR 303 13.74 to 20.63.~|~~|~1167F4A096A625A49B47B6B34D785AFB3AED3157 96561~|~1~|~2~|~02/S>2~|~Resurfacing POR SR 88 from 1.51 to 2.54.~|~~|~5E9FC3762DAE8B4CC5B422B0BCF29070DE96EDFD 96561~|~1~|~3~|~03/S>2/RAV1~|~Resurfacing POR SR 88 from 0.00 to 1.51 in the City of Ravenna...80/20 cost split.~|~~|~AE5B2373622893C4EE2078C5939030D72FD858E2 96561~|~1~|~5~|~05/S>2~|~Minor Bridge Work on SFN 6703534 POR SR 88 1.63 over Harmon Creek~|~~|~AF1FBED6C6179C408D78839641BFCEA4A305E85C 96561~|~1~|~4~|~04/BRO~|~Minor Bridge Work on SFN 6704506 POR SR 303 over Branch of Eagle Creek.~|~~|~C37A87BE76DF21D104320647242C73322E0640C4 99080~|~1~|~1~|~01/NFP~|~Constuct a 500 ton salt storage structure in Monroe County. Funded 100% state.~|~01 - New Construction~|~3A12196A4D3D75AC0820E53B356062796D2C8018 119974~|~1~|~1~|~01/S>2~|~Resurfacing, safety, and pedestrian improvements on Livingston Ave~|~05 - 4R Maintenance - Resurfacing~|~F043478012BA71204433124181856DDE503C0B4E 115418~|~1~|~1~|~01/IMS~|~Plan split~|~03 - Reconstruction - Added Capacity~|~72F6128817344B9A5842C5058C9A6634761EDDFC 112489~|~1~|~2~|~02/NFA~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~716C0252ED4188DE473A6D93BD5BF51B7E1420F7 112489~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~59E6ADCD729A7F46BB62A072C5D57A04270F88C0 113188~|~1~|~1~|~01/NHS~|~Rock slope repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3339CCD6F3D3CDD0BA7AD99DC57FD5D9C5B20BD1 96276~|~1~|~1~|~01/SAF~|~Guardrail project. Upgrading existing guardrail on various routes and sections in Meigs County. Funded 100% federal.~|~21 - Safety~|~25B2AAD12E0F027E126026CF23CFB0D5E58CEF54 124897~|~1~|~1~|~01/CMQ~|~MPO CMAQ funding~|~21 - Safety~|~473243F883F06836133833B4FE00616AC0EC4C45 124437~|~1~|~1~|~01/STR~|~Replace culvert type bridge carrying SR 172 over Branch West Fork Little Beaver Creek.~|~04 - Reconstruction - No Added Capacity~|~27A78FACE776D3A90AC71433C82A81D2657E6A4C 13239~|~1~|~1~|~01/STR~|~Brdg Replacement. .06 MI. N OF CR46 (MCDERMOTT-POND RD) 7302738 SCI SR73 16.87 Intersect: Stream7302762 SCI SR73 17.29 Intersect: Stream80 Fed/20 State. Both brdgs are eligible for BR funding but only for rehab, not replacement. 01/STR/BR/State~|~17 - Construction Engineering~|~D0C3C81D7612771FB5EE07833CAFBA86FD2DFD66 115554~|~1~|~1~|~01/STR~|~Two-lane resurfacing project. MRG CR 3 0.00-7.62. Work includes striping. centerline and safety edge. Funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~BA1AE6B22CC17BCF239CD0E203FFE8EE11F6F25B 102003~|~1~|~1~|~01/IMS~|~Highway Lighting Maintenance: LOR-90-10.78-11.96~|~44 - Other~|~2E423A4C73C2F8CDA9380C0E6C878046D08624EA 112623~|~1~|~1~|~01/MPO~|~Resurfacing of Mahoning Ave from Belle Vista Ave to IR 680 in the City of Youngstown.~|~17 - Construction Engineering~|~75AE9F8D0F9CE5413065F53496E49315CC002642 117067~|~1~|~1~|~01/SAF~|~Safety related intersection improvements on ROS 50. ~|~21 - Safety~|~9676A20BD7CD46349D1C3A275833AD795A71D371 101967~|~1~|~1~|~01/S<2~|~Apply herbicide along roadsides for weed control on 4 lane roads.~|~44 - Other~|~08B9F7BD456A05493898427E0A4A5D275FD3CA4F 104660~|~1~|~1~|~01/BRO~|~Bridges~|~13 - Bridge Rehabilitation~|~574655835C6A09A4511963810E1C769CD0E2A6B7 76353~|~1~|~2~|~02/IMS~|~Bridge deck patching, bridge deck sealing, approach slab resurfacing90/10 federal/state funding:2402343240225424023784902971490309949029122402319490294724022892402408240216549030644903129240233502/IMS/BR/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~06893F43205939285E8A995272D7BDC79F346025 76353~|~2~|~6~|~06/NHS~|~Bridge deck sealing. 80/20 federal/state funding:24008982400928240083924008552400790240086304/NHS/BR~|~13 - Bridge Rehabilitation~|~11A9E82868040778D3A79353A3E590A7D80DCB94 76353~|~2~|~5~|~05/NHS~|~Minor rehab pavement work, 80/20 D6 federal/state fundngFAY-35-7.51 to 12.04~|~05 - 4R Maintenance - Resurfacing~|~3CF72E146228C00E97CCE61C4EE2BABBFED2AFAC 76353~|~1~|~3~|~03/IMS~|~Interstate Pavement Markings & RPMsFAY-71 & MAD-71~|~05 - 4R Maintenance - Resurfacing~|~A5015E0C333F865095A0170AAFC024B755C195C8 76353~|~2~|~7~|~07/STR~|~Minor rehab pavement work, 80/20 D6 federal/state fundngFAY-435-1.26 to 1.32 / 1.50 to 16.7~|~05 - 4R Maintenance - Resurfacing~|~EF41BE285A89A91C71C6977F40448F6F350DD5F2 76353~|~2~|~4~|~04/NHS~|~NHS Pavement Markings & RPMsFAY-35 & FAY-435~|~05 - 4R Maintenance - Resurfacing~|~EFEBCB59895DB7A51C3D97942232AF2E16772716 76353~|~1~|~1~|~01/IMS~|~Minor rehab pavement work, 90/10 D6 federal/state fundngFAY-71: 9.45-14.66; MAD-71: 0.00-4.5601/IMS/PV/~|~05 - 4R Maintenance - Resurfacing~|~FBA73FA7AE9C96D6C73FD7CD57AEE5A0F1589D0A 115725~|~1~|~1~|~01/BRO~|~The bridge.~|~13 - Bridge Rehabilitation~|~500DFC67ADB19769886BC9EB11F6BB0CBC99CE43 109470~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacements on various routes throughout District 4.~|~21 - Safety~|~1D50E066033D3020D91AFC55218E5D850D99541B 126176~|~1~|~1~|~01/NHS~|~Plan split for all work on OTT-269-0154 bridge~|~17 - Construction Engineering~|~556733292776EFEECD9DD4B94BFB04E98A7D0AA8 107465~|~1~|~1~|~01/NHS~|~Resurfacing US 22~|~05 - 4R Maintenance - Resurfacing~|~A7C9F13FE68AE2AC68448CC59E1AC9452A90C2B8 115857~|~1~|~1~|~01/SAF/COSH~|~Upgrade of Signal Equipment within the City of Coshocton~|~21 - Safety~|~F24ED36F052725057EAD6F1F2B1377220A7CE326 94209~|~1~|~1~|~01/IMS~|~District wide bridge sealing contract.~|~47 - Bridge Preventive Maintenance~|~C6F898B8C64039FA36E23B96D80023B568146D19 94209~|~1~|~2~|~02/NHS~|~District wide bridge sealing contract~|~47 - Bridge Preventive Maintenance~|~1A264C9F1ACA2D83DD25E422E0D352D15A27F6BF 103704~|~1~|~4~|~04/S50~|~ERI-250-0.00 TO 0.49, Concrete Repairs in Sandusky (50/50% FED/LOC) Associate Add~|~05 - 4R Maintenance - Resurfacing~|~CF8A09DDCAA53D45537ABA9EB7F5B06EF9BA4644 103704~|~1~|~3~|~03/S50~|~Bridge Work SFN 2201542 ERI US 6 4.421 Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~C7738A418887BA19C299A4BF19615A904514FD92 103704~|~1~|~2~|~02/S50~|~100% City of Sandusky ItemsUrbanized Area Inside Corp. Limit(Items Such as Pavement Repairs, curb removed, curb, etc.):ERI US 06 03.64 to 05.61~|~05 - 4R Maintenance - Resurfacing~|~B8C0A332BBB7C4173E5C92363CD2A95264E60987 103704~|~1~|~1~|~01/S50~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit(Paving Items):ERI US 06 03.64 TO 05.61~|~05 - 4R Maintenance - Resurfacing~|~0076E7DF4C8F433F35D8898C6CDC1CA8C35F5E60 93291~|~1~|~1~|~01/IMS~|~?01/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP ? Deck replacement: 1) SFN 3002195, GUE-IR 70-25.27R carrying IR 70 over CR 94. BR Eligible for Rehabilitation: Length=112; SD/FO = (0); SR = 79.4; DSR = 5; 2) SFN 3002160, GUE-IR 70-25.27L carrying IR 70 over CR 94. BR Eligible for Rehabilitation: Length=112; SD/FO = (2); SR = 75.3; DSR = 5;~|~13 - Bridge Rehabilitation~|~B488404F4B9FC74A5925B08588E4A8B3B27FC3B5 91564~|~1~|~1~|~01/NHS~|~Replace existing superstructure on continuous slab bridge (JEF-7-0131, SFN 4100042) with a new slab superstructure. Replace abutments and provide new approach slabs. The vertical clearance will need to be increased by lowering profile of roadway under bridge.~|~13 - Bridge Rehabilitation~|~DAE48078B86BDAA4415C9233E252C0F23DF6F867 114396~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - 80% federal, 20% State~|~05 - 4R Maintenance - Resurfacing~|~15128936EAE2A2ECBFDEDD2017F4A8132DC73521 115517~|~1~|~1~|~01/NFP~|~Bridge replacement~|~10 - Bridge Replacement~|~A79838FBAC0558FEE445D55B2759E2C1D1689A75 95125~|~1~|~1~|~01/STR~|~Culvert on SR-4 in Seneca County~|~04 - Reconstruction - No Added Capacity~|~0108BCABE301558FEACB03CB42A15EE9A000F05F 115623~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~F51D484C82C3503ED84BC103FC7DA5478FFAA030 96099~|~1~|~1~|~01/NHS~|~Plans Split for Rockfall/Bench Cleaning~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E4C4C0D9A8D8118C76FBF06C9CAD100FE6CD893 119961~|~1~|~1~|~01/CMQ~|~Widen Kemp Road from North Fairfield Rd to Hanes Rd. Includes curb, gutter, storm sewer and sidewalk~|~03 - Reconstruction - Added Capacity~|~5C5304C71AC1CB30AAEED8DE4F978879D4BC2B07 119210~|~1~|~1~|~01/STR~|~Traffic Signal and Highway Lighting Maintenance~|~44 - Other~|~582478DB59446981DB5813D8B40DCC46285AC035 102742~|~1~|~1~|~01/S>2/AKRO~|~Resurfacing, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~DF90429839FE63A088F79A71E8021404CA0CA474 102742~|~1~|~2~|~02/S>2/AKRO~|~100% Akron items including ADA curb ramps, full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~C4414F4532A118A9F6BC15A12EA0D177F161A554 121340~|~1~|~2~|~02/S5K~|~STP >5 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~55C1CA5A844B7E232D1EF18E0C4479A988A6D984 121340~|~1~|~3~|~03/STR~|~STP Rural <5 Split.~|~05 - 4R Maintenance - Resurfacing~|~764ACB70E429E83DF8B037C2E81EDCECA1487025 121340~|~1~|~1~|~01/NHS~|~NHS plan split~|~05 - 4R Maintenance - Resurfacing~|~F85251269EF4F279D9CDF012589543F1271AC086 101865~|~1~|~1~|~01/IMS~|~Resurface and perform pavement repair on IR 70 throughout Preble County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E0FCB14B4269C16E12A40387AEAF69014673FAF 101313~|~1~|~1~|~01/IMS~|~plan Split for resurfacing on HAM-74 and HAM-275~|~05 - 4R Maintenance - Resurfacing~|~0C2DC7EB8B057DA274B29F948AA30D2656C6B6D1 126192~|~1~|~1~|~01/MPO/WARR~|~Signal upgrades.~|~21 - Safety~|~BD22BF213368B217FFC9DA078B2C4B6D83EDFEEC 110850~|~1~|~1~|~01/NHS~|~Lighting plan split~|~44 - Other~|~F3F886E768E41EEBDC4D529A63D99291E4F2E17C 106706~|~1~|~1~|~01/STR~|~See linked culvert.~|~04 - Reconstruction - No Added Capacity~|~523C34346BFD6972C1079B27D29A8095922FAD4C 109694~|~1~|~1~|~01/NHS~|~Resurfacing TUS-250~|~05 - 4R Maintenance - Resurfacing~|~2BB027DF3CFDFD0F7FE497E9626161F0001F37D0 107372~|~1~|~1~|~01/NFP~|~Installation of raised pavement markings (RPMs) along various routes in D5.~|~21 - Safety~|~D5FFFFA3F0B5ED55E4F78A59339E2672787108C9 126553~|~1~|~1~|~01/STR~|~CMP Culvert replacements~|~10 - Bridge Replacement~|~91EA11F7983623F8F5F7542F62C727498C11F689 109076~|~1~|~1~|~01/IMS~|~Erosion protection near Furnace Run structures along IR-77 in Summit County.~|~48 - Bridge Protection~|~34C864E6BD5FAAF3E9C89D090827A92112AE9A19 93207~|~1~|~1~|~01/IMS~|~Remove and replace deck overlay and patch large spalls on abutment using annodes on SFN 5708826 MOT 75 1636 (Keenan Avenue).~|~13 - Bridge Rehabilitation~|~613CBD84843CFA2B6350782ADC998AF4CA849E88 105578~|~1~|~1~|~01/IMS~|~Interstate plan split: FAY-71-0.00-2.40~|~05 - 4R Maintenance - Resurfacing~|~23B3E33E1EDA45FF85F4F14184CD4F447340F182 105578~|~1~|~2~|~02/STR~|~Rural plan split: FAY-38-8.24-8.95 FAY-62-15.49-26.74~|~05 - 4R Maintenance - Resurfacing~|~21F7FB0944E69F778CFDA792895448F367639CC8 105578~|~1~|~3~|~03/NFA~|~Not on federal aid system plan split: FAY-729-9.68-9.86~|~05 - 4R Maintenance - Resurfacing~|~E36EAC2B7419DE50DC5BC91879FD3764B4945E81 105578~|~1~|~4~|~04/NHS~|~NHS plan split: FAY-62-14.42-15.49~|~05 - 4R Maintenance - Resurfacing~|~272382E14E3D90A41A5B8B9B99D18EE6EC127E61 107034~|~1~|~1~|~01/BRO~|~LBR funding for bridge.~|~13 - Bridge Rehabilitation~|~11EFE58BBEBF999C08895C228014A02B590530CF 102699~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. VIN 93 2.156-7.200. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C5DBD1DADD385B927DC2A24F1F2B40E51163E876 102699~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment. VIN 93 0.00-2.156. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~76CFC04668473D3217900B0E17C8877F8868FFDD 108768~|~1~|~1~|~01/S<2~|~All work in this project.~|~05 - 4R Maintenance - Resurfacing~|~B00D7923A4E3A4B21429BA3080B31FE947CA5A1A 107494~|~1~|~1~|~01/STR~|~Resurfacing CAR-542~|~05 - 4R Maintenance - Resurfacing~|~1B41749459A2BF3D991EDAC6E26CBE0E5AEBD778 107494~|~1~|~2~|~02/SAF~|~Centerline rumble striping work~|~21 - Safety~|~B14439AB708C71A7DD98BFC4FEBB7361E4A472B7 92885~|~1~|~1~|~01/NHS~|~Urban paving - 80/20 - District Allocation/City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~9D5B8EB565653471A0CC62B65B251032C3B35880 92885~|~1~|~2~|~02/S<2~|~Urban paving - 80/20 - District Allocation/City of Lorain.~|~05 - 4R Maintenance - Resurfacing~|~57104CF2B9B281677D66B5DAC18D6EDCE3EC93FF 92885~|~1~|~3~|~03/S<2~|~100% City of Lorain.~|~05 - 4R Maintenance - Resurfacing~|~D8480C04288A63EAE873BF49250EB55FA794E4A7 105486~|~1~|~1~|~01/NHS~|~4PS7 (100% State) - Emergency Bridge Strike repairs on the Wilson Road Bridge over US 33 Fai-US 33-11.58~|~13 - Bridge Rehabilitation~|~F11CE999E3283D7942EE0C57B3DEBDD7964CB7A8 102072~|~1~|~1~|~01/ENH~|~Multiuse path.~|~28 - Facilities for Pedestrians & Bicycles~|~082AAD9E3BE71331F58BA51736EA493076FF83F1 124237~|~1~|~1~|~01/IMS~|~Plan split for roadway work~|~03 - Reconstruction - Added Capacity~|~FEC6CE35014805778786047AC8E52922D2F45F0F 87761~|~1~|~2~|~02/NFP~|~Water Works portion of project~|~43 - Utilities~|~0A7ECDA58A95C9396EC8A8110E7208185BF40D62 87761~|~1~|~1~|~01/SAF~|~Widen for two way left turn lane, left turn lanes at intersections, from Branch Hill Guinea Pike to Smith Road. Bridge CLE-28-0557 (SFN 1300032) will be widened for the project.~|~21 - Safety~|~ADA74A9AC24B0A06BA4587DDA82F61950C4EF0A8 105417~|~1~|~1~|~01/IMS~|~Bridge repair/rehab on Interstate bridges.~|~13 - Bridge Rehabilitation~|~4B2848F45F75392D1C7102A4A6C64606879241A1 105417~|~1~|~2~|~02/NHS~|~Bridge rehab/repair on NHS bridges.~|~13 - Bridge Rehabilitation~|~A9DA546307B3443FA0BDAF32FA338E5931851AE9 105417~|~1~|~4~|~04/S>2~|~Bridge rehab on large urban bridge.~|~13 - Bridge Rehabilitation~|~5AF1B2DB8875A4067DF90465F28CA65F1B9E63AB 105417~|~1~|~3~|~03/S<2~|~Bridge repair/rehab on small urban bridges.~|~13 - Bridge Rehabilitation~|~C8C968739956928D5AAB4E985B80222AD23463DE 105417~|~1~|~5~|~05/NHS~|~Bridge collision repair(Insurance claim to be created - separate plan split needed to track total costs for insurance claim).~|~13 - Bridge Rehabilitation~|~1BECB5E09C10C6E135267DEF1877C0109D134B76 112654~|~1~|~1~|~01/MPO~|~Resurfacing of Hoagland-Blackstub Rd from SR 5 to Everett-Hull Rd.~|~05 - 4R Maintenance - Resurfacing~|~72DEAD896A91B3FA55552A17754D56242D9E4ED6 100558~|~1~|~1~|~01/STR~|~plan split for work in the Rural sections on PRE-35~|~05 - 4R Maintenance - Resurfacing~|~6B874B690F9FBBBBFDC8B65B26C45593EBAB270F 100558~|~1~|~2~|~02/STR~|~Plan Split for the Rural sections on PRE-122 which includes edge replacement using M2 funds~|~05 - 4R Maintenance - Resurfacing~|~09704E701AE3D10A2C665556F37D3B996EA85F21 100558~|~1~|~3~|~03/S5K~|~Plan Split for the Small Urban sections on PRE-122 which includes edge replacement using M2 funds~|~05 - 4R Maintenance - Resurfacing~|~57BE678C3372CD85939BFD136A0C21EA6E957F2A 100929~|~1~|~1~|~01/S>2~|~Relocation and extension of Shakertown Road from Greystone Drive to Factory Road and realigment of Alpha Belbrook Road to intersect Shakertown Road west of Factory Road. The existing intersection of Shakertown Road and US-35 will be eliminated as a result of this work, consistent with the proposed improvements to US-35 (PID 80468). Shakertown Road will be constructed as a two-lane roadway and Alpha Bellbrook Road will be constructed as a three lane roadway.~|~01 - New Construction~|~78312B1E0AB7A05D22679D1D57EA9B0BB80DE7D5 124489~|~1~|~1~|~01/S>2~|~Pedestrian improvements~|~21 - Safety~|~50C56B9555077EBF03F21FDE0200E40EACE0723B 103573~|~1~|~1~|~01/NFA~|~The Township will improve and widen 3 miles of Bockey Road between State Road and Old Lincoln Hwy to support the growth of D&D Ingredients~|~01 - New Construction~|~E6EA30EA07C6D2D03B3716B3AD26EDDE9DA0A66F 76436~|~1~|~1~|~01/MPO/NEWF~|~Plan Split for SUM SR 619 4.73 to 5.01 widening~|~04 - Reconstruction - No Added Capacity~|~9AF2B216CA2F20B11EF2B78400448087E6B0967B 110942~|~1~|~1~|~01/NHS~|~Resurfacing work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~CEFF086C11413C69B0B95A95C43810114E8401DE 110942~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. ~|~05 - 4R Maintenance - Resurfacing~|~B155FA408536E986636ED9C2BB6C6A7A73833FFD 116444~|~1~|~1~|~01/S>2~|~Districtwide signal installation and repairs.~|~21 - Safety~|~74EF0044972CA38CE4A985EA47A14DBCE4877D18 111622~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout ATB, MAH and TRU counties.~|~21 - Safety~|~30CCD631ACEF3E6C14EDC9E24DE19E99918BFD73 101425~|~1~|~1~|~01/IMS~|~CO CO Contr 01 plan split created for the following Interstate routes: FRA-670-0.00-5.34/10.21-10.39~|~05 - 4R Maintenance - Resurfacing~|~38B8084D084F321ED57EED459AE4ED406F2227DA 101425~|~1~|~2~|~02/IMS~|~CO CO Engr 01 plan split created for the following Interstate routes: FRA-670-0.00-5.34/10.21-10.39~|~17 - Construction Engineering~|~1C57A57E209A84C5C0F963E7D311D808662039AC 102379~|~1~|~1~|~01/NFP~|~District 10 two year mowing project for CY 2022-23 along Interstates and Interstate look-a-likes (4 LN). Funded 100% state.~|~44 - Other~|~32B7A73815D10C07E96B86ECEC3DE5D7C99BE01A 102969~|~1~|~1~|~01/NHS~|~Microsurfacing on NHS route: MOT SR 741 SLM 4.56 to 6.20.~|~05 - 4R Maintenance - Resurfacing~|~ECAB46E53EB066B33F0BB77BFF301EDC734E5047 100596~|~1~|~1~|~01/STR~|~Microsurfacing of SR 149 and SR 331~|~05 - 4R Maintenance - Resurfacing~|~E7A997C01A895556A070203127F6491C086735CD 105016~|~1~|~1~|~01/STR~|~Landslide repair project. VIN 327 3.21-3.28. Rural other federal aid funded 80 federal/20 state GSM.~|~04 - Reconstruction - No Added Capacity~|~7163F5747DB5C54ED0D8D8100BC1E858A8067CC4 101058~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay to ATB US 322 from 15.24 to 17.49, ATB SR 307 from 17.07 to 18.13 and 19.88 to 20.67.~|~~|~51CAE1853C0ADB44EE8778E0C39F67AEF6374CA9 111644~|~1~|~1~|~01/NFA~|~Landslide repair project. WAS 676 2.50. GSM funded. Not on the federal aid system funded 100 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2CDC3D35F7177DE9FDEA5A734BF575B16189467F 101909~|~1~|~1~|~01/SAF/LCEO~|~CEAO HSIP Funding - 4HB7 (100% Federal) - See CAP Comments - Pavement Marking upgrade on various County Routes County wide~|~21 - Safety~|~D7CD3DB2671C6A36503698A10B5E67D2196B4843 115897~|~1~|~1~|~01/MPO~|~Plan split for eligible MPO funded work.~|~28 - Facilities for Pedestrians & Bicycles~|~DA34DBB72B32F5EF5942CB35CA3E6865AA50F73C 125694~|~1~|~1~|~01/IMS~|~Apply recessed and wet reflective markings in D-05.~|~21 - Safety~|~AC841CB6C2F6D7175841F1AA89279AD394A3B2D5 120925~|~1~|~1~|~01/SAF~|~Traffic Signals.~|~21 - Safety~|~19E115B4FD277DC36A4AFE29DE2C5AA9988D87EF 95281~|~1~|~1~|~01/IMS~|~Project includes hazardous cargo detour signing around Lytle Tunnel.~|~21 - Safety~|~D8E9FAA8049EDF4F4C372F05A3BBA2E8B5F6A299 96618~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7.~|~13 - Bridge Rehabilitation~|~3CF5F53C463D4AC80102746B819BB6570F979ACD 96129~|~1~|~1~|~01/NFA~|~Facilities contract for UST removal~|~44 - Other~|~0EC1B982A8E1893E136BA00D7C552B2E7A73F75E 98526~|~1~|~1~|~01/NFP~|~Systematic Sign Replacement~|~21 - Safety~|~6F35F5E12627E8190343F50A97D41446E5F63D8C 120841~|~1~|~1~|~01/S5K~|~added plan split.~|~21 - Safety~|~FFDBD307D2B5CEDC3BE13E1471966BD3C226B5DF 105403~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS route bridges.~|~13 - Bridge Rehabilitation~|~640DACFA6E4814D72ECADA9C6CC0B4922C0C35F3 105403~|~1~|~2~|~02/IMS~|~Bridge rehab on Interstate bridges.~|~13 - Bridge Rehabilitation~|~F6D05AF22F91E0B19B85347B33CD625A2EDC4BB6 88883~|~1~|~2~|~02/STR~|~Costs to hang sanitary sewer in place- Medina county to be billed.~|~10 - Bridge Replacement~|~20C23D93484DCFE6A5D38DAEC6609015D4C41AE9 88883~|~1~|~1~|~01/STR~|~MED-SR-252 03.990 SFN 5206871 (Over W BRANCH ROCKY RIVER) New Construction ? Structure(repl) (002) ~|~13 - Bridge Rehabilitation~|~740BBA94D0FC0C48155DC589512B96A5A2254A12 125428~|~1~|~1~|~01/NFP~|~BM FY32 plan split.~|~47 - Bridge Preventive Maintenance~|~80B432A3AAF5771AB892316DD892F8462DC3330B 125682~|~1~|~1~|~01/IMS~|~Plan split for reconstructing the existing pavement~|~04 - Reconstruction - No Added Capacity~|~89FFF6C14D9E711B3E11B3C7420E2BCCA8C33FE0 125682~|~1~|~2~|~02/IMS~|~plan split to add a new lane~|~03 - Reconstruction - Added Capacity~|~66C3167E0BEF90A08F55A7CB9D317C5B815384CE 125682~|~1~|~3~|~03/IMS~|~plan split for bridge work~|~04 - Reconstruction - No Added Capacity~|~3C288C6C3BE008D536A7E6C34D63EB0816BA7F73 91315~|~1~|~1~|~01/IMS~|~Priority system paving of FRA-270: 2.60-9.63~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~935B33FD6489810DA9A3C3B68DEC8D5883B62C30 97473~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-CR 13-46(Green Valley Road) SFN 4234308 - BR Eligible for replacement: L=85'; SD/FO=1; SR=31.0; DSR=5;~|~10 - Bridge Replacement~|~3CA073D99386D86801B008EE65FA0678485AC911 97473~|~2~|~2~|~02/BRF/KCEO~|~"02/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-TR 365-41 (Dean Road) SFN 4237579 - BR Eligible for replacement: L=63'; SD/FO=2; SR=37.0; DSR=5;~|~10 - Bridge Replacement~|~A0DFD85B01BEFF02BFCDA09283883D911E13920A 97473~|~3~|~3~|~03/BRF/KCEO~|~"03/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-TR 399-10 (Hyatt Road) SFN 4237080 - BR Eligible for replacement: L=120'; SD/FO=1; SR=20.5; DSR=6;~|~10 - Bridge Replacement~|~554C3EF157E6FE9B8023E221BEA1E461E97019FA 92023~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. 1809504~|~13 - Bridge Rehabilitation~|~84FA10866397D80776CDFF812047DA90742648E1 93518~|~1~|~1~|~01/SAE~|~100% Federal Highway Safety Improvement Program funding for upgrading the non-compliant end terminals on top 100-150 locations on remaining high volume routes state routes under ODOT jurisdiction.~|~21 - Safety~|~F639DF672820E5C1CEC2A52DA7E4E8C567601CC8 81711~|~1~|~1~|~01/NHS~|~Remove and replace reinforced concrete deck on bridge (HAS-151-2310, SFN 3402312). Paint/replace structural steel and raise bridge to meet current design standards. Also, provide new approach slabs.~|~13 - Bridge Rehabilitation~|~725E665AA367189CB1E77F767E18CFBFF8CEA727 93469~|~1~|~1~|~01/IMS~|~Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.~|~01 - New Construction~|~2313408A73819F72EC3BD760F52021C8B7B61590 93469~|~1~|~2~|~02/ENH~|~88][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Retrieved criteria from user's session: null2012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Retrieved criteria from user's personalization: null2012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Made brand new criteria: us.oh.state.dot.ellis.projects.ProjectSearchCriteria@687ad7782012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0]) [ us.oh.state.dot.ellis.web.projects.ProjectSearch] Retrieved quick search criteria from personalization: 12012-05-08 11:21:46,851 DEBUG (ttpProcessor[10088][0~|~~|~5DDC034278FCFF76F2C90A814A0FBAAB9576B804 120717~|~1~|~1~|~01/STR~|~Bridge deck replacement project. WAS 339 1.24, SFN 8403996. Funded 80 Federal/20 State.~|~13 - Bridge Rehabilitation~|~14C44B9F8B614952BD91C14F50D55450F30A9449 99710~|~1~|~1~|~01/NFP~|~Raised pavement markers along various routes throughout District Four.~|~21 - Safety~|~4C9B50F187CC5DDACD58AD1743EF54134FD3FA97 97498~|~1~|~1~|~01/BRO~|~Rehabilitate existing bridge carrying SR 800 over Weaver's Run by replacing the deck slab and abutment breastwalls. The pier piling will also be encased. In stream work is required.~|~13 - Bridge Rehabilitation~|~CE971ABC2B7BEE7E8C42D070EA61AD8F59F74117 106504~|~1~|~1~|~01/IMS~|~Repair PRE-70-0827 culvert~|~04 - Reconstruction - No Added Capacity~|~FC8F3391B1E2525003F1360361E219C5754FEEF0 106504~|~1~|~2~|~02/STR~|~Replace small culverts PRE-35-0684 and PRE-177-0069~|~04 - Reconstruction - No Added Capacity~|~C2105656AD6BD2CBC52F220F93F90003892D4CA9 124015~|~1~|~1~|~01/IMS~|~plan split to construct the stream protection~|~~|~D430668603009F35D51D27FB513757B49D865BF6 102005~|~1~|~1~|~01/NFA~|~Culvert replacement on HIG 785 2.67.~|~04 - Reconstruction - No Added Capacity~|~477F01149DDAB23DAF5487D82EB114C6C47204C7 92644~|~1~|~1~|~01/MPO~|~Highland Ave CR98 0.00-2.23~|~~|~031A2F3366E66B4B28C1EDF56511CAF39DF18A76 115497~|~1~|~1~|~01/NFA~|~Guilford Lake Camp Area resurfacing~|~05 - 4R Maintenance - Resurfacing~|~71EE0A78D754D8B97102C6EBDB8D30F59CCC28DB 102252~|~1~|~1~|~01/STR~|~This plan split is for STP rural~|~16 - Right of Way~|~1F30F603CAB7EBDAB0338C8DFA7959FF633601E4 126119~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~21 - Safety~|~0DA31665262F493267A8A2D5ECFEDF30ED650C27 113128~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment~|~21 - Safety~|~B5D823CE482EEF6E6C9A4D3BB97AA8E8E5DF3147 106463~|~1~|~1~|~01/BRO~|~Replacement of the existing deficient bridge and improvements to geometry and sight distance on the southwest approach to the bridge.~|~10 - Bridge Replacement~|~22141C2964334AC0EECB3389A35329AED99436F4 109134~|~1~|~1~|~01/NFA~|~Landslide repair project. MEG 143 9.20.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54F5F2F6460CE89377DA424E7102E23E80A9677F 93688~|~1~|~1~|~01/NFP~|~District Preservation Program funds - 100% state funds - No CAP - Resurfacing on PAU-49/613-5.78/0.00/6.08~|~05 - 4R Maintenance - Resurfacing~|~AD70827DDC972CF8CCB7712A7A396292CECAAB82 117430~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~870A33B34091CB0E4DBC28A00BFC14A6FCB18761 96866~|~1~|~1~|~01/ENH~|~Construction of a pathway near Ellsworth Hill Elementary School in the City of Hudson, Summit County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~1C984639FF5688FA159AD9F8EAED758A264AFF4A 94787~|~1~|~1~|~01/NHS~|~Place pipe liner in existing deep fill twin concrete culverts on SFN 0600431 AUG 66 2051 over branch of Blackhoof Creek. SFN overall lingth is only 12 ft.~|~44 - Other~|~54F03FDFAACFD0F20F0DEC0B34D4B6969554B0CD 107325~|~1~|~1~|~01/NFP~|~Split for sign structure work~|~21 - Safety~|~CF0C07E632DA973AB21EFA54F263E048EFB236B6 107325~|~1~|~2~|~02/SAF~|~Split for improved signing to IR77 north and south (CUY-IR-480; 18.45 to 20.32)~|~21 - Safety~|~7E2965A49C7B58E10E5C8E605057EC9081E15457 122275~|~1~|~2~|~02/BRO~|~CO Contr 01 CEAO LBR funds plan split, Shayler Rd Bridge~|~13 - Bridge Rehabilitation~|~76216440C87AF5E5C3C98FF603D5B68E9BE60311 122275~|~1~|~1~|~01/BRO~|~CO Contr 01 CEAO LBR funds plan split, Shayler Rd Bridge~|~17 - Construction Engineering~|~0DB52F0FCCC2F1E156E9BC558F17133692CDA9A7 117921~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-H ~|~63 - Electric Vehicles & Charging Infrastructure~|~956C68F285A15E89B791EDE8431224964A6CAEA5 108351~|~1~|~1~|~01/MPO~|~Construction of bike lanes in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~245B6F4E43840D31A878BA6C318EA5E063860251 95980~|~1~|~1~|~01/NFP~|~Design and construction of new facility at Grafton outpost building.~|~01 - New Construction~|~3227B471A9597A33C4349F3BC982917754E71523 90243~|~1~|~1~|~01/MPO~|~MORPC/Delaware County pavement widening of S Old State Road~|~03 - Reconstruction - Added Capacity~|~ADB16B01D9CEB1E576C2DB77D43750135E5A6F2B 90243~|~1~|~2~|~02/MPO~|~Fiscal Year 2020 MORPC Construction Contract costs~|~03 - Reconstruction - Added Capacity~|~A33ECFFE52417BC96D6A942BD44AD0EDE94C0D7E 90243~|~1~|~3~|~03/MPO~|~MORPC Construction costs for FY 2021~|~03 - Reconstruction - Added Capacity~|~BA88C29576F7792AFFD98BF0A50D6622971B8BC6 121317~|~1~|~1~|~01/STR~|~added STP Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~E9D321A6335FF967FF7FA6E6338E111E12D0BD0F 102655~|~1~|~1~|~01/S<2~|~Bridge Culvert Liner: LOR-SR -0611-00.05 (SFN 4707435)~|~13 - Bridge Rehabilitation~|~5F4E8C7CB33647603D6165C9A480B6F1D76CDDE1 102655~|~1~|~2~|~02/NHS~|~Bridge Culvert Liner LOR US 0006-06.86 (SFN 4707532), Bridge Deck Replacement on LOR US 0006 06.83 (SFN 4707508)~|~13 - Bridge Rehabilitation~|~84CBBAF9CFAF2B4E96DBAC21BD890DE055B0781F 95357~|~1~|~1~|~01/NFP~|~Construction of salt building, Rootstown Township, Portage County, Ohio. Funded with Central Office Facilities dollars. Will eventually be transferred to D-4 budget.~|~44 - Other~|~8AE18FE640AA9C6111CC019F5DBB06A4F1CD03D3 95357~|~1~|~2~|~02/NFP~|~Construction of driveway and parking lot. Funded with District 4 Facilities dollars.~|~44 - Other~|~D226797EEEF4020C7D4A1C1F1DF947E84E7A65F2 108869~|~1~|~1~|~01/NFP~|~The PORT AUTHORITY will contract for transportation engineering services to study access conditions on Fayette Township Rd. 1429 East, Sandusky Rd. and US-52 intersection and recommend improvements with estimated costs~|~44 - Other~|~E041B68C02EE8B159B4688EC4FF91E4B80EFF808 96137~|~1~|~1~|~01/NFA~|~Construct two (2), 1,000 ton salt storage buildings at the ODOT Clark County Full Service Facility.~|~44 - Other~|~7C382EE302FBE824D3813DA5B20884B251FD79A3 115571~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~~|~E4081EF117CC6ADE723382D99F6801722D8FF929 88797~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D01A8C1069773E4356EECBB45C252B4D4324CB39 81722~|~1~|~1~|~01/NHS~|~Resurfacing of SR 7~|~05 - 4R Maintenance - Resurfacing~|~360DD212CA6206882C0B43D77A964A7ED53DFF46 81722~|~1~|~2~|~02/NFA~|~Resurfacing Park & Ride at SR 213~|~05 - 4R Maintenance - Resurfacing~|~32E5367E31A5DBF7CAFCB8AEDBEA1282D39B00D5 81722~|~1~|~3~|~03/NFA~|~Resurfacing SR 7/SR 213 Rest Area~|~05 - 4R Maintenance - Resurfacing~|~98A92FA708F6B6B2B11B09483B2EEAC5CF0F06AD 81722~|~1~|~4~|~04/NHS~|~Bridge deck sealing select bridges on SR 7.~|~47 - Bridge Preventive Maintenance~|~EDE3FDFD8F42F5B494C73A886308B197F1EE7CC9 93373~|~1~|~1~|~01/NHS~|~Priority system paving of FRA-161: 15.06-17.30~|~05 - 4R Maintenance - Resurfacing~|~1900B789C83571F54FBCE0690D33179B04E1C5FC 111634~|~1~|~1~|~01/STR~|~Reconstruct the profile along County Road 82 and County Road 80/Township Road 378 to improve the visibility of the intersection at County Road 82 and County Road 80/Township Road 378~|~21 - Safety~|~B922D5267010321108E230EEACA9FAC89795B319 106300~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4.~|~~|~945DB6CA39366123E19422EF389AE644390C06D5 107302~|~1~|~1~|~01/CMQ~|~Conversion of two existing T-intersections, US-42 with (1) Bethany Road, and (2) Mason Morrow Millgrove Road to modern roundabouts. Construction of a shared use path from Bethany Road, along US-42, connecting with the City of Mason Sports Park on Mason Morrow Millgrove Road.~|~21 - Safety~|~BDA4A43AEE7F1DE875028074347FF99A3B2E1290 95843~|~1~|~1~|~01/IMS~|~Spot paving and resurfacing to repair damaged pavement from the winter season. Miami County SLM 14.15 to 19.95/ Shelby County SLM 0.00 to 8.88.~|~05 - 4R Maintenance - Resurfacing~|~369F7F37DAC89B69400222F84F0D870728A65D83 82388~|~1~|~2~|~02/IMS~|~Split for the bridge portion of the project~|~10 - Bridge Replacement~|~363FA0ECD55B6213F10FAD10812EEAEFD6B55999 82388~|~1~|~1~|~01/IMS~|~Split for the pavement portion of the project~|~03 - Reconstruction - Added Capacity~|~7B0ED8678F616FF0615EB94F61A2CC245D599FA1 111047~|~1~|~1~|~01/ERD~|~Plans split for remaining Earmark FB1102 funds~|~26 - Ferry Boats~|~53E160F77BB43498977BF2567BF3B128F990547D 125844~|~1~|~1~|~01/IMS~|~Interstate Mowing in D8~|~44 - Other~|~2316D9CF3220E559159341E80DE62A97C4E08B07 125844~|~1~|~2~|~02/IMS~|~Interstate mowing in D7. ~|~44 - Other~|~9788CE708CC0E736C148A216A87BA25A152D82B1 102540~|~1~|~1~|~01/IMS~|~Rehabilitate or replace 14 structures on IR-77.~|~17 - Construction Engineering~|~8E44301A1B63CE199B54345287D1FE361E1211D7 92788~|~1~|~1~|~01/SAF~|~For LUC-20A-2.23, LUC-120-11.15 and WOO-51-3.23~|~21 - Safety~|~2A356D520C3750C55AAABC3D094E8718D2A7CECA 92788~|~1~|~2~|~02/NFP~|~This split is for the differential cost between decorative pole and generic.~|~21 - Safety~|~E2300C0BA53A572A5D71DCCD88110FE708F207B9 125862~|~1~|~1~|~01/S>2/MASS~|~Resurfacing, urban paving in Massillon.~|~05 - 4R Maintenance - Resurfacing~|~BF70D2A5D4895E030DDD2BC45C53BE3173BE6B12 125862~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~30D39CC291FD0AC6C61416BCE1D5EA672EDBF6DC 125862~|~1~|~3~|~03/S>2~|~Pavement repairs and curb ramps at 100% local~|~05 - 4R Maintenance - Resurfacing~|~0FA1328BD0D073803C28D4D3CB7B9F40496722B4 113149~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~28D1E3C097F560C54EE716A73E0D64DF0061021E 113149~|~1~|~2~|~02/STR~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~4C148E7C8B7791E8C6962DFBDA6F0B9ABC5B7711 113149~|~1~|~3~|~03/STR~|~Minor bridge work, 10 to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~E4A93F846952E2163FB5C4003713A99E8C07BD07 90863~|~1~|~1~|~01/NFA~|~Plan split. Remove debris from channel.~|~~|~FB268673D3BC67820FEBD35E50CF385CD4E38BB7 120040~|~1~|~1~|~01/S5K~|~plan split.~|~04 - Reconstruction - No Added Capacity~|~A4FD3261E585637A7FDF686FF6F0BA14A85268FD 122867~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement.~|~~|~807C5ADEA60CCAB73C3257CB32561E2A6F365BD2 122867~|~1~|~3~|~03/IMS~|~Bridge replacements. SFN 7703570 replaced by SFNs 7703571 and 7703576, SFN 7705859 replaced by SFN 7703572, SFN 7705883 replaced by SFN 7703574.~|~~|~D28AB2BEA4DD9E0568D08D9FD9890FEF11AB5C49 122867~|~1~|~4~|~04/IMS~|~Bridge deck replacements and widening.~|~~|~7227D548CEBFA1E19EACF7B9202022B5D9FC1DEB 122867~|~1~|~2~|~02/IMS~|~Widening for additional lane.~|~~|~001F41DD1F523DF67EDC8F5D612C90C2F051D2AC 122867~|~1~|~5~|~05/NFA/AKRO~|~New waterline installation long Jason Ave and I-76 paid by Akron.~|~~|~B91185BCF776265E4B914D8C35E6B2166EBAB288 119902~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-B~|~~|~AD7917C69769AD13356609E4E8B16599EBD0F80C 88763~|~1~|~2~|~02/STR~|~Bridge portion of project~|~13 - Bridge Rehabilitation~|~36C4E1213E180B1EFC609F9A06EB70A4A442C741 88763~|~1~|~1~|~01/STR~|~Resurfacing portion of project~|~05 - 4R Maintenance - Resurfacing~|~3A2A6DC4DD329726FA75E01B497A49877CD02A68 104893~|~1~|~1~|~01/S<2~|~This plan split is for the Urban portion of the project.~|~05 - 4R Maintenance - Resurfacing~|~06C7907D147D9E0C5B731FE0ECB5AAE656D16711 124636~|~1~|~1~|~01/SAE/FAY~|~Intersection improvement (roundabout) at the intersection of SR41 and CR27 in Fayette County to improve safety.~|~21 - Safety~|~9094645AA1894B710E11E66C46618F52AEE2F5B5 114658~|~1~|~1~|~01/STR~|~Project to Insert structural liner into bridge size culvert CLI-68-0942 that carries US 68 over a tributary to Cowan Creek~|~04 - Reconstruction - No Added Capacity~|~BDAAC7B26C03A8742319FD5B72E33B2D96B2312C 97806~|~1~|~1~|~01/IMS~|~Mowing various locations in COL, HAS and JEF counties.~|~31 - Landscaping & Other Scenic Beautification~|~D39A4774E76342A4451A8E0D89E14B40437BB936 100745~|~1~|~1~|~01/BRO~|~Funding from district bridge allocations using SACs 4PF7 and 4PS7 to replace the box beams on structure WYA-53-6.20.~|~13 - Bridge Rehabilitation~|~FFAD24569EF7A0266602FE31C7B1077E61D4EEA9 123731~|~1~|~3~|~03/STR~|~Plan split for resurfacing SR-53 from SLM 0.00 to 4.541~|~05 - 4R Maintenance - Resurfacing~|~04BC1A66C4E0FABC86B3EF80AA91BA22E559424E 123731~|~1~|~4~|~04/NHS~|~Plan split for widening of US-6 from SLM 12.981 - 13.17~|~04 - Reconstruction - No Added Capacity~|~F1405434F20113C3349FAF7136876E60D8777595 123731~|~1~|~5~|~05/S5K~|~Plan split for widening of SR-53 for turn lane from SLM 5.85 - 6.023~|~04 - Reconstruction - No Added Capacity~|~110CAA4D076DB8EAB409237FF7C5D99E861240CB 123731~|~1~|~1~|~01/NHS~|~Plan split for all resurfacing of US-6 from SLM 13.17 - 14.312~|~05 - 4R Maintenance - Resurfacing~|~9C588E0B583C1D96241F86D7636BAFA2C197D56C 123731~|~1~|~2~|~02/S5K~|~Plan split for resurfacing SR-53 from SLM 4.541 - 5.85~|~05 - 4R Maintenance - Resurfacing~|~3701E497CCDA88D13D8A49660AD0E354962FBE3F 90443~|~1~|~1~|~01/MPO~|~Minor rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E52810E0573BD4EE3FC159F0201D18DBACA53B8 124386~|~1~|~1~|~01/SAF~|~Federal~|~28 - Facilities for Pedestrians & Bicycles~|~F5FC72EBBF6E09CFA3FC64155B94DA9CA7DA1FCC 98744~|~1~|~1~|~01/BRO~|~100% State funding for temporary repairs to Hawthorn Parkway over US-422 bridge.~|~44 - Other~|~AE3A25A89CC90AC27B9ACE9896F467D840BB2CE0 100617~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of roadway work on US 42 from SLM 5.92 - 9.54. This is the 100% ODOT portion~|~05 - 4R Maintenance - Resurfacing~|~5735EF0F288EFC06062EEF682F09B68C6C211E10 100617~|~1~|~2~|~02/S>2/MASN~|~Urban Paving portion of US 42 in the newly annexed section between SLM 5.17-5.41. This is the 80/20 split.~|~05 - 4R Maintenance - Resurfacing~|~2D7A92B93D52F853FFF394AD228FA412A808DD8D 109210~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~AB5428446AC47A3F7C8D5F937E5CEEC59CC52F5C 109210~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~4CAFA6C3A805086F54BEF8F279EAE40443C58BD7 109210~|~1~|~3~|~03/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~95F1BA536C9D068039995A392D7E63B0372F264E 105581~|~1~|~1~|~01/STR~|~UNI 31 from 7.79 to 15.65 UNI 347 from 8.26 to 15.23~|~05 - 4R Maintenance - Resurfacing~|~2844D96012147A77768C4C96261F2686CD027104 100500~|~1~|~3~|~03/S<2~|~100% Local for Curb ramps and Full Depth repairs~|~05 - 4R Maintenance - Resurfacing~|~C172679F91D3E7F439587ADECF984DAF02852C56 100500~|~1~|~1~|~01/S<2~|~JAC 93 (15.40-15.58)~|~05 - 4R Maintenance - Resurfacing~|~043C738168B44269318DB21FFF1F97260C96289D 100500~|~1~|~4~|~04/S<2~|~Bridge maintenance~|~47 - Bridge Preventive Maintenance~|~C970287391A676C13DA7FC737EA5DC58D81BB119 100500~|~1~|~5~|~05/NHS~|~JAC 93 15.48 (SFN 4001206)~|~47 - Bridge Preventive Maintenance~|~BAD0E2D79FF056038B1903149F0F517C9F51BF33 100500~|~1~|~2~|~02/S<2~|~JAC 93 (15.58-16.63) (16.80-17.46) Local MatchJAC 139 15.29-15.60~|~05 - 4R Maintenance - Resurfacing~|~6565AC559D3D87F5F1B8243E946748C0BACBF93C 100500~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~712AA461003CFD17F8EA2089AE277373E28547AB 107761~|~1~|~1~|~01/MPO~|~Signal upgrades on various routes throughout the city.~|~21 - Safety~|~69C66F9FD27BEEF9C96FEECB0AAC6B8BE79465B8 112268~|~1~|~1~|~01/IMS~|~Pavement Marking Fast Dry throughout District 6~|~21 - Safety~|~D84D972E8470A901129F54338734ED43FD42B359 101141~|~1~|~1~|~01/STR~|~DSR# BEL-016~|~~|~D7978DC62C8C937F6ABC998F7B549770889E8983 80109~|~1~|~1~|~01/NHS~|~NHS funding for minor rehab of UNI-33, 12.59-25.11 and asphalt OL's on 4 structures:SFN 8001537, UNI-33-23.57R, Kile DitchSFN 8001502, UNI-33-23.57L, Kile DitchSFN 8001561, UNI-33-24.89L, SR-161SFN 8001596, UNI-33-24.89R, SR-161~|~05 - 4R Maintenance - Resurfacing~|~5C5AEE8FC5614313ADD20CE4BEC00624BB547A20 115432~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - superstructure replacement on SFN 4203119, KNO SR 514 4.97.~|~13 - Bridge Rehabilitation~|~76406C31CBDDF67AA1A5C7C18F638A3B8D922807 95298~|~1~|~3~|~03/S<2/HAN~|~Work of the portion of Sixth Street/CR 290 which is outside the City of Findlay. Work is still inside the Findlay Urban Area. Federal funds from the City of Findlay's "Large Cities" budget with the 20% match provided by the Hancock County Engineers office. South side of road from Amelia Avenue to Williams Street and both sides of the road from Williams Street to Blanchard Avenue.~|~05 - 4R Maintenance - Resurfacing~|~318EF34FA69103CB5492CD320192CE59D3B1DE26 95298~|~1~|~1~|~01/NHS/FIND~|~Work on Main Street. Main Street is a Urban Principal Arterial. MAP-21 expanded the National Highway System (NHS) to incorporate principal arterials not previously included. Federal funds from the City of Findlay's "Large Cities" budget with the 20% match provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~BD550F27460BC7E7079334B3AC0F7595EF886279 95298~|~1~|~2~|~02/S<2/FIND~|~Work on streets not on the NHS. West Sandusky Street and Sixth Street. Federal funds from the City of Findlay's "Large Cities" budget with the 20% match provided by the City of Findlay. All the work on West Sandusky Street and all the work on Sixth Street between South Main Street and Park Avenue is in this split. The work on the north side of Sixth Street between Amelia Avenue and Williams Street is also in this split.~|~05 - 4R Maintenance - Resurfacing~|~DEDB318AD42D27247305B43AF4C308E4DF2BE4C3 120373~|~1~|~1~|~01/ENH~|~Construct bridges on existing substructures for the Moonville multi-use trail. Funded 80% Federal TAP/20% Federal Safety. ~|~28 - Facilities for Pedestrians & Bicycles~|~3368B6B3A7DE6D813F85AB8641297225CC3343EF 114806~|~1~|~1~|~01/NFA~|~Not on federal aid system plan split.~|~05 - 4R Maintenance - Resurfacing~|~1EF009E3A76A1EACF4017F647F9707CCFE169A14 114806~|~1~|~2~|~02/S<2~|~WCH Urbanized area plan split.~|~05 - 4R Maintenance - Resurfacing~|~CE0A81A8971109FA381C2AC82C51578C80C27075 114806~|~1~|~3~|~03/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~9E83032C1D332F3FC5AEDABB3C55A0E9D29157AA 114158~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2027.~|~21 - Safety~|~5956F682046B98A0F44B0AAB9E5E29F395C70F29 108022~|~1~|~1~|~01/MPO~|~Resurfacing within the City of West Carrollton.~|~05 - 4R Maintenance - Resurfacing~|~B8410E30A1409FF4FFE361504C6CA88812459738 115798~|~1~|~1~|~01/IMS~|~Construction of left turn lane on the westbound exit ramp and a new right turn lane on the eastbound exit ramp at the IR 76 and Bailey Rd Interchange.~|~21 - Safety~|~520FF55A8A1261F82A6A0C709DBB8CC66DF6AF61 115798~|~1~|~2~|~02/IMS~|~Installing new signals at the MAH-IR 76/Bailey Rd interchange. ~|~21 - Safety~|~AA27435EC31163A02018FF79F623310206EDCA7E 102491~|~1~|~1~|~01/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Spot Paving and repairs on selected IMS - Interstate routes in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7357A3610CE628AF4F63C84FA5351140D4BE4D1B 102491~|~1~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Spot Paving and repairs on selected OFRAH-Rural routes in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ECCD1235938DDA2F1ED74E2C777CBBEF685A6812 102491~|~1~|~3~|~03/NFA~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Spot Paving and repairs on selected NFA - Rural routes in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E0D2D8FBEFF4DCEAD16A3166462AC9E432B78E08 102491~|~1~|~4~|~04/NHS~|~Plan Split 04/NHS/OT/ - District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Spot Paving and repairs on selected NHS routes in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7CAEBED5D88078EE6D348E933213CAB1942BF9B1 86923~|~1~|~1~|~01/S>2/Barb~|~Widening 31st street from Wooster Road to Shannon Avenue for the addition of a TWLTL including signal upgrade for the Shannon Avenue intersection, in the City of Barberton, Summit County, Ohio.~|~21 - Safety~|~E1361B20F8C22EB7AB071F1F9BE0D0A4B5525B3C 91948~|~1~|~1~|~01/IMS~|~100% State Maint. Funds for 1 year~|~21 - Safety~|~7616D28FC9B819B96B8BADC2FEE96E86A1DC28DF 114734~|~1~|~1~|~01/NHS~|~FY 25 Overlay~|~05 - 4R Maintenance - Resurfacing~|~B4F20F892F1DF323925072B3DE3074BDEFE9D79D 114734~|~1~|~2~|~02/NHS~|~Added bridges ~|~47 - Bridge Preventive Maintenance~|~F2A79C11FC8227B156EB81179A339FBA9322B926 111274~|~1~|~1~|~01/NFA~|~ODNR Tar Hollow State Forest.~|~04 - Reconstruction - No Added Capacity~|~95C1B244EACC7F88ED4EE79358E4AFBA85A9E272 90914~|~1~|~2~|~02/STR~|~Bridge Replacement HUR-SR-13-2.47~|~10 - Bridge Replacement~|~EC76190926E6225BFA404AF35219E0DA35329B05 90914~|~1~|~1~|~01/NHS~|~Bridge Replacement ASD-250-24.67 (west of TR 35) ~|~10 - Bridge Replacement~|~8349B79E8FBD275948585F786547D77B193B8229 87702~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~99 - State Preventative Maintenance~|~7C127E747F04975B5A65958FC73A737F9D238F8A 99792~|~1~|~1~|~01/BRF~|~CEAO/MRW County funding for bridge replacement~|~10 - Bridge Replacement~|~7BABF98721F33AB14714D7B659E4C362CDEB85A6 111050~|~1~|~1~|~01/SAF~|~Construct roundabout at Strausser St (CR 231) and Lake O Springs Ave (TR 227).~|~21 - Safety~|~2A216C14A71AFBAD48C01D1613B9346419DAEACD 83056~|~1~|~1~|~01/STR~|~SR131 0.00 - 7.06 Minor Rehab - Resurfacing ProjectBeginning at the Brown County Line, head east and terminate at SR138, it is proposed to resurface the highway with asphalt concrete.Pave thru these two bridges.3602168 1.210 3602257 ~|~05 - 4R Maintenance - Resurfacing~|~61F25AFE671805CDB4DC4A151FABE2BDE043E474 83056~|~1~|~2~|~02/STR~|~On bridge 3602206, 1.540, & bridge 3602222, 3.850, it is proposed to perform minor rehab and deck sealing.~|~13 - Bridge Rehabilitation~|~A1BB997A844D487B78303CC04F7E92491F5F7A26 108864~|~1~|~1~|~01/NFP~|~The COUNTY will construct a new left turn lane going north on SR 61. Additionally, going south on SR 61 a right turn lane will be positioned directly across from Bennington Glen headed north on SR 61~|~01 - New Construction~|~C430FA305BE93F9E5F4BE6ED19B1CAAACA71FFCD 108035~|~1~|~1~|~01/NHS~|~Bridge Rehab~|~13 - Bridge Rehabilitation~|~215D2E68AF1BA4100185B83A0D7C7138638D9C11 108745~|~1~|~1~|~01/NFP~|~D09 Bridge Maintenance FY25~|~47 - Bridge Preventive Maintenance~|~D58EA8862398109A16091DD6B3E08128393DC1C1 105888~|~1~|~1~|~01/S>2~|~Split for urban paving work~|~~|~CB0C2D3BD9C2B8962025F34C18D4CA407086F694 116076~|~1~|~1~|~01/NHS~|~Bridge liner ~|~10 - Bridge Replacement~|~FF39628E3F66121B26782138B6D07E3F8DFB2EC7 97988~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of SFN 4505018 ; Lic-SR 79-19.91 carrying SR 79 over Wilkins Run~|~13 - Bridge Rehabilitation~|~A1DC669C9E631A45FCEDA227051666FFB1FB998D 114814~|~1~|~2~|~02/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~A3A522DBB1AB6FE89FFE55EB53B1548A67F4BB48 114814~|~1~|~1~|~01/S5K~|~STP>5,000 Plan SPlit~|~05 - 4R Maintenance - Resurfacing~|~623C4BCE9F224396F6A37626C58B739126A629DF 108862~|~1~|~1~|~01/NFA~|~Guardrail replacement project. VIN CR 19 0.00-0.50. CEAO Funded 100% federal.~|~21 - Safety~|~D11386230472CF3615EDAFAD1EE7855517BE3E36 110296~|~1~|~1~|~01/S<2~|~Slide repair on BRO 41 1.59~|~04 - Reconstruction - No Added Capacity~|~82350ACA5EAC34C1B0ECBA54E92610CCF622C2AB 90807~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on LOG US 68 SLM 8.10 to 8.49 and SLM 8.68 to 9.77 (segment length 1.09 Total Lane Miles 2.18). Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~37989FFBAF7A208A3D350222E1D1F07653D8D571 90807~|~1~|~5~|~05/STR~|~Deck waterproofing and overlay remove and replace on SFN LOG-235-0953, LOG-235-1358, LOG-235-1536.~|~13 - Bridge Rehabilitation~|~56FC3EEC87ACE3F9E3510E2884D4A2C51CCC028E 90807~|~1~|~2~|~02/S<2~|~Pavement planing and resurfacing with asphalt concrete on LOG US 68 SLM 9.77 to 10.09 (segment Length 0.320 Total Lane Miles 0.640) .~|~05 - 4R Maintenance - Resurfacing~|~97E12699A1447A6293C14A04BFD09C477A91EBC8 90807~|~1~|~4~|~04/BRO~|~Remove and replace deck overlay with waterproofing and concrete. SFN 4601564. LOG-68-0979.~|~13 - Bridge Rehabilitation~|~D2343F1224B8CF124B5B327EA9753A39E5DE4FF1 90807~|~1~|~3~|~03/STR~|~Resurface the existing roadway along with other roadway related items on LOG SR 235 from SLM 8.18 to 17.43 segment length 9.25 total lane miles 18.50.~|~05 - 4R Maintenance - Resurfacing~|~E61F22170E990C9C19496FC39992EB7F5C23616F 106241~|~1~|~1~|~01/NFP~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~1BFC44AB4B5AE98B568AB77DD660A7AC2445BCE1 124637~|~1~|~1~|~01/SAF~|~Upgrade guardrails on county roads~|~21 - Safety~|~6A9607D522188B6AA0DF837AB0D809BBFBCA38CC 125660~|~1~|~1~|~01/S>2~|~Plan split for large urban chip sealing. ~|~05 - 4R Maintenance - Resurfacing~|~A58F60DACF82DE7E9B385729632CC1C6A7028561 125660~|~1~|~2~|~02/STR~|~Plan split for rural chip sealing. ~|~05 - 4R Maintenance - Resurfacing~|~F1D604864AD073C367152B795EBF5C14503A4BAE 106356~|~1~|~1~|~01/NFA~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~0767EE4F37EC816B8FB49B4AA89A2BCF21995164 105525~|~1~|~2~|~02/S<2~|~Work that is inside the Ada Urban Area. Work on SR 235 in Hardin County from the boundary of the Ada Urban Area boundary at 16.796 to the north corporation limits of the Village of Ada at 19.26. Work on SR 81 in Hardin County on both sides of the road from where the road enters the Village of Ada on the right side at 2.25 to where it leaves the Village of Ada on the right side at 3.98. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~DA48C1935E44F933874CC12B4D30F79FE6CAEBF6 105525~|~1~|~1~|~01/STR~|~Work on SR 235 in Hardin County from SR 309 at 15.99 to the boundary of the Ada Urban Area boundary at 16.796. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~0E66EDE6B83593C8B1387F22F0A9DABA90AAF7B0 105525~|~1~|~3~|~03/NFA~|~Work on SR 701 in Hardin County from the junction with SR 309 at 0.00 to the junction at US 68 at 8.93. All funds from the District Preservation Program budget. No local funds. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds.~|~05 - 4R Maintenance - Resurfacing~|~1295DF05BD7DC8615E6F1C988A7C0696FA4E45AE 105525~|~1~|~4~|~04/NFP/ADA~|~Work funded 100% by the Village of Ada. Costs to pave driveways and alleys back to the sidewalks where the driveways and alleys are not currently paved.~|~05 - 4R Maintenance - Resurfacing~|~D162E323BC86A8D937B487513DE23097BF682FF9 125971~|~1~|~1~|~01/STR~|~Slope repair.~|~66 - Resilience Improvement - Highway Project ~|~F666FD0299B4107EB17B31CD98897E951B1180CB 117350~|~1~|~1~|~01/NFA~|~Bridge Replacement~|~10 - Bridge Replacement~|~B7F33303B1ACD5AED355079535B55EE2812E0425 88825~|~1~|~1~|~01/NHS~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~C300A5FC8C8268F1028ACD03AB1BD3C8FF7403D6 123387~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~317BF5CB60D24056B7494B752FFB6CB991EE2BC8 116618~|~1~|~1~|~01/NHS~|~All work~|~05 - 4R Maintenance - Resurfacing~|~0709A2E71D81F42BD16400FE3A8B2A4F018FB357 85134~|~1~|~1~|~01/NHS~|~Minor pavement rehab on US 27 from Millville to north of the RR track~|~~|~425B2801A5E2837D38FB6562F71AE151F214013A 102150~|~1~|~1~|~01/STR~|~Bridge replacement JAC SR 124 23.41 (SFN 4002407)~|~10 - Bridge Replacement~|~606B64148327E75B4DBC0A8A1A1FF874584852A5 125737~|~1~|~1~|~01/NHS~|~Bridge work throughout District 5.~|~13 - Bridge Rehabilitation~|~2FEB9374B39C6598B8FE2244BD63C84052EA5812 100878~|~1~|~1~|~01/STR~|~Chip seal on DEL-257, MAR-203, MAR-257, MRW-19, MRW-314, and MRW-656.~|~05 - 4R Maintenance - Resurfacing~|~B83FC0198646094A0DA77DE235D5B326BA7E3365 100878~|~1~|~2~|~02/NHS~|~Work on DEL-23 CD Roads~|~05 - 4R Maintenance - Resurfacing~|~5FEF1ABF31B72296799BED7B7C734F08FE814BCA 121166~|~1~|~1~|~01/STR~|~All Work is in this split~|~21 - Safety~|~228FC6FF3C1EF0192EB61914E403CA026C641E27 90785~|~1~|~1~|~01/MPO~|~Widen from four lanes to five lanes with the center 12' lane functioning as a two-way left turn lane. Project also includes curb and gutter, sidewalks, closed storm darinage, public and private utility relocations and conventional street lighting.~|~21 - Safety~|~85A6EAB35FBC3DD09C03A776AC1EFCE5981076D2 103641~|~1~|~1~|~01/STR~|~DSR# BEL-013~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B7F585CF96F20F70F9BE0CAF46C618B9A1515EE0 123127~|~1~|~1~|~01/IMS~|~Deck overlays on ~|~13 - Bridge Rehabilitation~|~3F64536068909048E4F51AC576BF430296B09AAA 84763~|~1~|~1~|~01/BRF~|~"01/BRF/BR/COL" - COL CR 421 0.74 replace existing 3 span bridge over Youngstown & Southern Railroad; ~0.10 mile S of TR885; project length is 0.19 mile; includes horizontal realignment improve curvature, guardrail, curbing, drainage, striping and signing. OBPP funding at 100%.~|~10 - Bridge Replacement~|~50CA8E28F7102C6FAE0F796E1759779E0DDD9DE8 84819~|~1~|~1~|~01/BRF~|~Remove existing bridge and place a new precast, reinforced, concrete culvert structure whil completing associated roadway approach construction in Mercer County TR 131A on Stose Road. SFN 5433452 MER TR 131A 0603~|~10 - Bridge Replacement~|~93A6A0676DA9862D9C263CDA99E656D7C8B304B0 88876~|~1~|~1~|~01/NHS~|~District Allocation~|~10 - Bridge Replacement~|~B97EF51462DEF11333F1BDCFFCA24EF1BF5541D7 106237~|~1~|~1~|~01/NHS~|~Replace bridge carrying SR 7 over Us 250, US 40, and SR 7 ramps and Wheeling Creek.~|~10 - Bridge Replacement~|~25C07029462F951B88726112EEABD17E4C188B74 113117~|~1~|~1~|~01/IMS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~2B7C778D7273DC3C958EC0C29CF402260603D9B4 85397~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for Urban Paving funds~|~05 - 4R Maintenance - Resurfacing~|~75A07844BC608865E024A1331C6ED1F9E6A4A329 85397~|~1~|~2~|~02/S>2~|~Plat for non-eligible Urban Paving items at 100% Local~|~05 - 4R Maintenance - Resurfacing~|~3B689A946C27D24781512E85450F7C831B810F8F 97795~|~1~|~1~|~01/IMS~|~SFN 5705193 BR. No. MOT-70-0708 (Kimmel Road) - Replace bridge deck, convert to semi-integral abutments and patch substructure.~|~13 - Bridge Rehabilitation~|~4A2A0867A276BF1B86D786C7391178911AF60690 107234~|~1~|~1~|~01/S>2~|~Items related to safety improvement to include signal modifications, pavement markings, and the addition of a westbound left turn lane.~|~21 - Safety~|~5850625CF76A0C342AEA2138ABC513C0BD0AD4E9 107234~|~1~|~2~|~02/S>2~|~Reconstruct the pavement at the intersection.~|~05 - 4R Maintenance - Resurfacing~|~B7D5814B2FCC57DAC2E4A5503F31B8952D494615 126923~|~1~|~1~|~01/SAF~|~Plan split for HSIP work, including: travel lane widening, addition of curb and gutter, pedestrian facilities, removal of fixed objects. ~|~21 - Safety~|~FF31729053D7209D71441BF2BB2FA5964FF0A5E3 126923~|~1~|~2~|~02/S>2~|~Roundabout at Winter Hazel Dr/Cherry Laurel Dr~|~21 - Safety~|~75B69CAC8BDB7AF3E74D04CE9C372A6871C6CB56 120456~|~1~|~1~|~01/S>2~|~Sidewalk improvements on Noe Bixby Rd, Winchester Pike, Dempsey Rd ~|~28 - Facilities for Pedestrians & Bicycles~|~E20A5B4BF13462611DB4ED4AA36E3993B55D4FCB 116419~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~4B4116E698139BB4B1422FCD26747D585293BC3A 105911~|~1~|~1~|~01/IMS~|~Split for work to install VSL signs~|~44 - Other~|~EB775FA6E0DEF2F7427A3DD28AA3E4F610FE520B 101386~|~1~|~1~|~01/STR~|~STP Rural Pavement Replacement~|~04 - Reconstruction - No Added Capacity~|~91FC64C25704892D1E6A5C44AC20C78CAC07DACD 117347~|~1~|~1~|~01/SAF/CAMB~|~Repair and/or replacement of sidewalk facilities along Clairmont Avenue from 10th Street to Clark Street~|~28 - Facilities for Pedestrians & Bicycles~|~9EF00EC30AF95E80583E9172C4A9F8DC8587C5C4 91888~|~1~|~2~|~02/SAF/BCWS~|~Plan split for 100% locally funded waterline upgrades within the project limits.~|~21 - Safety~|~1BC87B6873F13DB74594B9F5682E7C6AE54565AF 91888~|~1~|~1~|~01/SAF~|~Address angle crashes at the existing two way stop controlled intersection of SR-748 and Layhigh by constructing a roundabout and cul-de-sac'ing Kirchling Road at SR-748.~|~21 - Safety~|~8AA782477893921094D20AD332298056C4EB9261 94637~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split using MPO STP funds for the Turney Road resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A1D1592F5C2B626F327F04721D790C67500D497D 94462~|~1~|~1~|~01/STR~|~District Wide Pavement Marking~|~21 - Safety~|~1B2534CDAB2F821BFA2EFE71CFA6CB70A4BE8A4A 19837~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 1) 6002285 MUS IR70 0.59 Intersect: CR 30 Mt Perry Rd; BR Eligible for Rehabilitation: Length=241 SD/FO(2) SR=70 DSR=5;~|~13 - Bridge Rehabilitation~|~560BE85826090AFEF329EF8DE78765628D4AA42E 110478~|~1~|~1~|~01/SAF~|~Grade Separation overpass on BRO 32 & Brooks Malott Rd.~|~21 - Safety~|~9CE946EDF8114A4C2384B8E0EA6586A440C49208 110478~|~1~|~2~|~02/NHS~|~Overlay on 32~|~05 - 4R Maintenance - Resurfacing~|~0F1C0D3A04EFC28CC95B32DF46D537664A96ED6E 110478~|~1~|~3~|~03/SAF~|~Recessed Wet Reflective Pavement Markings~|~21 - Safety~|~6981300FF1E3D31A3AEE91AFD12DF3FAFD5B64AA 110478~|~1~|~4~|~04/NFP~|~Plan split added for alternates. Priority #1 is 100 percent local funds and priority #2 is federal/state funds. ~|~21 - Safety~|~D89D90A24E6CEB4054790268A1CD8B45553D0CB9 116278~|~1~|~2~|~02/S5K~|~Microsurfacing RIC-61-7.692 to 8.63; RIC-61-12.386 to 13.194~|~05 - 4R Maintenance - Resurfacing~|~9A594A2309CE0E1EAE5C3ED4635F04E9FFA647CA 116278~|~1~|~1~|~01/STR~|~MicrosurfacingLOR-301-6.304 to 2.221RIC-61-8.63 to 12.386~|~05 - 4R Maintenance - Resurfacing~|~374E908B20BCD6F9DAA84A214A99D0A1B1FD3554 93375~|~1~|~1~|~01/BRO~|~80% federal / 20% local split using CEAO LBR funds to demo the St. Clair Street bridge.~|~44 - Other~|~40BFE6737975D21493A141F373ECDCB93F369008 86212~|~1~|~1~|~01/IMS~|~Asphalt overlay and patching on structure FRA-270-5.63 (SR 104 over IR 270) SFN 2508583Replace approach guardrail~|~47 - Bridge Preventive Maintenance~|~5953B9048C78080E84BA13AE443045B61C57C866 112177~|~1~|~1~|~01/NHS~|~Culvert repair and replacements.~|~04 - Reconstruction - No Added Capacity~|~3D5719BBACF315771650ABA1AD698D51C7A9943E 112177~|~1~|~2~|~02/S>2~|~Culvert repair and replacements.~|~04 - Reconstruction - No Added Capacity~|~E7788FA17E233F4E2B7E3D8102D995836C539724 112177~|~1~|~3~|~03/STR~|~Culvert repair and replacements.~|~04 - Reconstruction - No Added Capacity~|~F2507A6ECD3EFD2F63301B37D943B57A75F9A123 95955~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority~|~44 - Other~|~A062F021567E18FDBF4E7DD6AFA2C793F63D0C51 121192~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings, and school zones throughout the District.~|~21 - Safety~|~5E526E20CC092B2EDF80ED5507A9CF728732D8D7 126754~|~1~|~1~|~01/SAE~|~Primary split for CEAO Safety funding~|~22 - Rail/Highway crossing~|~E17AC471CCF395BB509B1324B91D4239B0C3E7EA 113612~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~2D1159F4471980DCF1DD2DE0F93B6555E8A44583 119157~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~38D4394C47716878D15EB871F8FB8D8AC3F3D7FB 79736~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~07F915C35A816ADF2E48615D0C7E7E7D6FEBCD8E 106290~|~1~|~1~|~01/BRF~|~All costs to replace the bridge. Federal funds from Municipal Bridge Program. Toll Revenue Credit is being used. The portion of the match not covered by Toll Revenue Credit and any funds needed after the cap is reached are the responsibility of the Village of Carey.~|~10 - Bridge Replacement~|~EB781CA1094933AE0E64A1D1AFD09129FEBC1541 100734~|~1~|~1~|~01/BRO~|~01/BRO/BR/- District Preservation 4PF7/4PS7 (80/20) - No Cap - Bridge Number WYA-53-2185; SFN 8801924~|~~|~AC6B7DFA463CD703ABC04BFBA8A5A2771970D8EC 109432~|~1~|~1~|~01/MPO~|~Construct bike path - Clark County Park District~|~28 - Facilities for Pedestrians & Bicycles~|~10483CA8AEC3C799E3531E72B215620A8ED92335 116963~|~1~|~1~|~01/NHS~|~Culvert liner project. HOC 33 10.12 (CFN 1879194). NHS route funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~4EA39F60EB0D5AAFFEE3727E1716114D898E551E 95481~|~1~|~1~|~01/NFP~|~100% state funds using the District Preservation Program SAC 4PS7.~|~44 - Other~|~87869C46DD019D430C40EA50DE217FCBDBA5EB71 127110~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~E8CEA73CB2E1566D49DD7CE0B95E00915AA78355 97558~|~1~|~1~|~01/STR~|~CR 2 15.62 (SFN 0132160)~|~10 - Bridge Replacement~|~043D200B4369F9531635F4BA45C2E1AF6D26AC01 97558~|~1~|~2~|~02/STR~|~CR 3 7.91 (SFN 0130621)~|~10 - Bridge Replacement~|~51829DB10D38E0435D84A674957C77D3046F21A0 97558~|~1~|~3~|~03/STR~|~TR 11 1.73 (SFN 0135216)~|~10 - Bridge Replacement~|~28EC9DE4513B5581627543ACB8F3157AD454170B 125517~|~1~|~1~|~01/STR~|~bridge replacement.~|~10 - Bridge Replacement~|~8C2F4A237C8BDAA1DE74F90B368306BCD9CAE453 92745~|~1~|~1~|~01/NFA~|~Landslide repair project funded by GSM program. MOE 255 11.75-11.85. 100% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C66C8100C883C241C5DE02BD5B402548744ECABF 116403~|~1~|~1~|~01/STR~|~"01/STR/BR/ " 80% Federal (4PF7) and 20% State (4PS7) - replacement of PER-155-07.42 (SFN 6401988).~|~10 - Bridge Replacement~|~2BA17D65D4858F847C00617A36374592E05E6C66 92171~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance Funds for one year Electrical Maintenance Contract~|~44 - Other~|~D58BD1F37013D7D2FB68F7CC7C2EDA216BA5B0FF 102833~|~1~|~1~|~01/NHS~|~Resurfacing various NHS routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~E47900D38C2EBBA79DE2A3F92F2D98877D206FBB 102833~|~1~|~2~|~02/IMS~|~Resurfacing various Interstate routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~75CB0940D8C2E5616321BF47EAA327B5232D701E 102833~|~1~|~3~|~03/STR~|~Resurfacing various STP Rural routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~E76FA787DC11D7C690CE5A8D6B9500A44894CCA4 124338~|~1~|~1~|~01/NFA~|~Bike path~|~28 - Facilities for Pedestrians & Bicycles~|~233E0F6E2F3514255BB5EFF0610B50EF1384DF06 125473~|~1~|~1~|~01/BRO~|~Preventative Maintenance~|~47 - Bridge Preventive Maintenance~|~AB37ED7B76693046D766C0A45E131FDA95C32806 105147~|~1~|~1~|~01/BRO~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~10 - Bridge Replacement~|~72F1951B126C9A06EE9404F42D34CE2401315A65 126564~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~21 - Safety~|~15D96E720078FA94980271A05BFEF13FFD7C6C2F 92882~|~1~|~1~|~01/NHS~|~100% City of Bellevue~|~05 - 4R Maintenance - Resurfacing~|~7406FB071D4822012592BE33D5A13BF2DEFEE8F7 92882~|~1~|~2~|~02/NHS~|~Urban Paving - 80/20 - District Allocation/City of Bellevue~|~05 - 4R Maintenance - Resurfacing~|~A75E041D38ADE4D7EE64E386352535EF95B28486 92882~|~1~|~3~|~03/NHS~|~Concrete Pavement Repairs - 50% Federal/50% City of Bellevue~|~05 - 4R Maintenance - Resurfacing~|~9615DA3A7C174C8AAEC824CB0F252D82B2A0A784 92882~|~1~|~4~|~04/NHS~|~SAN US 0020 33.56-64 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~580FA44DA4E36F4CB244054AF37CEA9EB0B1AD10 122875~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~~|~650D6C2BB5CB57BF0A36B677C39FA589A85FF99A 100994~|~1~|~1~|~01/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~683C5F0CFC12D2EA43528D506CCA31951C6F8F37 125308~|~1~|~1~|~01/S50~|~Pavement rehabilitation with Federal 4TA7 funds at 80% up to the maximum. ~|~05 - 4R Maintenance - Resurfacing~|~689471FDA98C437689CCF8E9810757C85361D0DD 125308~|~2~|~2~|~02/SAF~|~Radar detection upgrades with State 4PS7 funds (uncapped).~|~21 - Safety~|~7DEAC86E4464BF3BC37716F4B62C9F96E0CD1F8B 93829~|~1~|~1~|~01/STR~|~Brdg ReplacementProject Termini: Located 5.41 miles west of SR772 on SR124 Project Description: It is proposed to replace the structure, SFN 6601294 on SR124. 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~900F01C9FA2F0DCC51D5ADE31314125291865ACF 105023~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 821 18.31-18.36. GSM funds. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F0544507A9EF163B6C8A194B99E1125991CD3CF8 91924~|~1~|~2~|~02/NHS~|~Repair the inlet side of the bridge culvert (SFN 7101694).80/20 02/NHS/BR/State~|~44 - Other~|~290881D92CED73F5FA1033AA3ABC97A7AEB02C62 91924~|~1~|~1~|~01/NHS~|~Culvert ReplacementOn US35, 0.85 mile south east of the Ramp A from SR138, it is proposed to replace the culvert @ 5.80.80 Fed/20 State01/NHS/OT/State~|~44 - Other~|~DC1E58D74FA3FCF71F082BB31989A0A977A15B84 98857~|~1~|~1~|~01/ENH~|~This project consists of construction of a bike path to connect an existing bike path at Fleckenstein Park and extend it south, 500? along the east side of Mason-Montgomery Road to a path that terminates about 500? north of Bethany Road. In addition, extend the bike path 3,100? eastward along the north side of Bethany Road to an existing path at Windemere Way.~|~28 - Facilities for Pedestrians & Bicycles~|~47EDE942512BCFDC86F570D8145D37FA67F00DBC 121870~|~1~|~1~|~01/STR/PHIL~|~Sidewalk and curb ramps in Village of Philo along Old River Rd (CR 6) from Bridge Street to 2nd Street. TAP Funded - Carbon Reduction / Safety $350,000 Construction Phase at 80% 4CT7/20% 4HJ7~|~28 - Facilities for Pedestrians & Bicycles~|~A0FE5680BA380E75C0E51FF9D0F33EB4DDBCF866 111183~|~1~|~1~|~01/S5K~|~Bridge replacement.~|~~|~3DB2B28AC8DE94DB58D515CE623D9A424A162905 94371~|~1~|~1~|~01/BRF~|~Bridge replacement using 95% federal funding (80% from CEAO LBR funding and 15% Credit Bridge Program credit) with 5% Local matching funds.~|~10 - Bridge Replacement~|~E871A18007224184A7684ECDCA8F07424687B75A 110705~|~1~|~1~|~01/NHS~|~All items of work associated with spot repair.~|~05 - 4R Maintenance - Resurfacing~|~1FB8DAC5567C924876E2DB15D368FE93DA7FCDD5 105058~|~1~|~1~|~01/ENH~|~Construction of a sidewalk along Bassett Road from Fairbanks Avenue to Elberon Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~F5A019A82AFD2536ADC38A649E94BB5C8D2E7420 93723~|~1~|~1~|~01/NFA~|~Scioto County Engineer~|~44 - Other~|~5582CF9881A2835E2A151CA48C6A2187B64F14BF 93723~|~1~|~2~|~02/NFA~|~Scioto County Engineer~|~44 - Other~|~A3570214535C8CBB0A8389282BECC1239EE0C356 88683~|~1~|~1~|~01/STR~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete from the MIA/CHP County Line (SLM 0.00) to the Junction of SR 560 CHP SR 55 0.00 to 11.65.~|~05 - 4R Maintenance - Resurfacing~|~AE2EF4D3AB0BD2B7A67C7C6227EAFA74FA7FA318 101219~|~1~|~2~|~02/STR~|~Resurfacing STP Rural eligible portion of US 127.~|~05 - 4R Maintenance - Resurfacing~|~193B840402E88E205D353520C552F494478BD32D 101219~|~1~|~1~|~01/NHS~|~Resurfacing NHS eligible portion (WIL-127-1.05 to 1.94).~|~05 - 4R Maintenance - Resurfacing~|~AC654ADAA09EDC7AFACC221AD497E55A7ECABD9D 125796~|~1~|~1~|~01/NHS~|~Replace SFN 8000808 CMP culvert~|~10 - Bridge Replacement~|~0B780C6488DA1620EEC54D88C168C4ACB2EA8757 125796~|~2~|~2~|~02/BRO~|~Structure replacement for SFN's 2101459, 5101786, 5900107~|~10 - Bridge Replacement~|~6310CFB27A337EB4F6400970DDE63EFCF860B35A 116761~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~BC1EA922EDCE92EAC43F26484E328EE488AF0B1A 108953~|~1~|~1~|~01/NFA~|~Construction of the Hampton Hills Bike Trail.~|~~|~3B8EFA0BB82FC2EB4809D341C458B3CB8B0BD171 110145~|~1~|~1~|~01/CMQ~|~Signal equipment upgrade eligible for federal-aid~|~21 - Safety~|~2DEC813E6CABB1797ADBC347C18CD247C18C95CA 110145~|~1~|~2~|~02/NFP~|~Work that is not eligible for federal-aid~|~21 - Safety~|~1AC017D9B19466C9ADFD14A90F2A35DCD4EC39AE 92813~|~1~|~1~|~01/SAF~|~Construct five foot paved shoulders (8 foot width) along CR 385 (Derr Road) from SLM 1.00 to 3.40 and also install a NB right turn lane at Kinsgate Drive, install a NB right turn lane at Montego Drive, and install a traffic signal at Montego Drive~|~21 - Safety~|~C4A0D35939335A8024141175449B592C464388DF 114827~|~1~|~1~|~01/STR~|~Items of work associated with bridge repair~|~13 - Bridge Rehabilitation~|~D339023131439C4AE5596A94FEA6AFB9681D8421 120433~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State~|~21 - Safety~|~00AC760774B23F6A3F8652827EDF0A66E9112E39 87723~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~E345D7B3B7A44DB41FA06CC73B3B354E1D566BD5 125187~|~1~|~1~|~01/IMS~|~Landscape maintenance along the Interstate~|~31 - Landscaping & Other Scenic Beautification~|~CBBF8DCEE7F301FCEE48D093F2D7813CED6F55F8 101536~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County.~|~21 - Safety~|~8EDE5A8F6B686206314FC9835D48B6EB2641FE81 100490~|~1~|~1~|~01/STR~|~SCI CR 10 FLAP Phase 3 (0.00-1.40)~|~05 - 4R Maintenance - Resurfacing~|~F4C5FBBE6A34D6E8F33A8475BFFB4B10D592F91E 100345~|~1~|~2~|~02/S<2~|~Work on SR 66 inside the Defiance Urban Area but outside the City of Defiance. All work on the left side of the road from the Defiance Urban Area boundary at Watson Road (2.01) to Carter Road (3.05). Work on the right side from 2.01 to 2.20 and from 2.31 to 2.39. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~5A6E88124AA2A614C4AAAD1C08F5C88698DEBD35 100345~|~1~|~1~|~01/STR~|~All work on SR 2 and SR 18 and the work on SR 66 from the Defiance/Paulding County line to the Defiance Urban Area boundary at Watson Road which is CR 17 and at 2.01. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~7CAEB4C146B7323EC484BA7F6E10904070BFE9D7 100345~|~1~|~3~|~03/S<2/DEF~|~Work on SR 66 inside of the City of Defiance. Work on the right side of the road from 2.20 tp 2.31 and from 2.39 to Carter Road (3.05). Federal funds are from the District Preservation Program budget. The 20% non-federal match is provided by the City of Defiance.~|~05 - 4R Maintenance - Resurfacing~|~1B6EA348CF2BEC47D241F78822D0B8DDBEAB224C 115852~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2029.~|~21 - Safety~|~D237DEF4E07FB3D1AAFD8C76B2D18D84F33C4A84 100611~|~1~|~1~|~01/BRO~|~Sealing of bridge decks througout the District at various locations~|~47 - Bridge Preventive Maintenance~|~B30E69BC0EC8A388E7B07523894AFEBBDF1E3688 96673~|~1~|~1~|~01/IMS~|~Structural steel painting~|~47 - Bridge Preventive Maintenance~|~E87B474A93BCE7C4978BD955B8EEEA6DDE3C87F1 107845~|~1~|~1~|~01/STR~|~District preservation funds.~|~44 - Other~|~EC62A8DB7A522079F0D3FB17E342D1C585AAABF8 113058~|~1~|~1~|~01/NFA~|~Replacing twin 9' culverts on N Poplar St in the Village of Jefferson.~|~~|~30F12BD0608D68103882CCD6C450CE896885780C 106232~|~1~|~1~|~01/ENH~|~The Drainage Construction will begin just south of the intersection/roundabout at MED SR 57 SLM 17.65.~|~04 - Reconstruction - No Added Capacity~|~6A7C7C79288B5AB1008495325F5E5AE8A69843F6 106232~|~1~|~2~|~02/ENH~|~construction funding event for the water line work associated with this project. This will be paid 100% by the Medina County Sanitary Engineer~|~04 - Reconstruction - No Added Capacity~|~DC793856E4E43525CCC9FC923F2BF3D90D3C4F32 123669~|~1~|~1~|~01/BRF~|~All Work is within this split~|~13 - Bridge Rehabilitation~|~3874975A1FCEF75B0297105F2AE604016E135182 95535~|~1~|~1~|~01/STR~|~General System Resurfacing to include asphalt overlay, pavement marking and pavement repairs on SR 9.~|~05 - 4R Maintenance - Resurfacing~|~4FF5863759B3CF4FCD43DCE06E17019326EF80AD 97676~|~1~|~1~|~01/SAF~|~90% federal/ 20% state utilizing safety funding all eligible work excluding CE.~|~24 - Traffic Management Engineering - HOV~|~0E1316B92F3E1FDB0A69CA386E827ACF4361693F 121301~|~1~|~1~|~01/NFP~|~GR plan split.~|~21 - Safety~|~E134F47CFDDE81ECA92DAE3DB7EB592FB91570A7 108883~|~1~|~1~|~01/NFP~|~TID will construct the Chamberlain Road project as described in the TID?s SFY19 ODOT Funding Application to repair the roadway to ensure that it is capable of providing a smooth and safe movement of trucks.~|~44 - Other~|~8167889952B45353600711541AE33AE70AF5BF70 104797~|~1~|~1~|~01/NFA~|~plan split~|~17 - Construction Engineering~|~7A5DCC51D4A4EC7588061777EDD13BF3FDDFFD98 98825~|~1~|~2~|~02/NHS~|~Split for resurfacing work using MPO funding~|~05 - 4R Maintenance - Resurfacing~|~2BCEFEDA4A0E7F3D28E82BAB7299CA878C98665B 98825~|~1~|~1~|~01/NHS~|~Split for the concrete pavement portion of the project using district allocation~|~05 - 4R Maintenance - Resurfacing~|~68DBDD6F0F9B5CE04B1E9E1B4290D48AEB93B387 105704~|~1~|~1~|~01/SAF~|~plan split~|~44 - Other~|~16059BE03698DBC00A34F850E16DD8F832E75613 114204~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 145 0.00-8.94 and WAS 145 0.00-3.25.~|~05 - 4R Maintenance - Resurfacing~|~E21526F21F18015A895E6BADF6EC8C6411CBB476 114204~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0E5A1260B64EE89D436085334B7498A917EC99D5 113600~|~1~|~1~|~01/S>2~|~Intersection improvement at Red Bank & Colbank in the Village of Fairfax (Alternative E1)~|~~|~9D1AABAF56047460E85313AABCF5D427E98B1154 103884~|~1~|~1~|~01/SAF~|~Work to widen the shoulders that is eligible for safety funds.~|~~|~60BB88E259430F6AD128DD2077997A8C5A3E644B 103884~|~1~|~2~|~02/STR~|~Split for resurfacing work on the existing pavement.~|~~|~1E256733D8C08316EC69699A3F06621CE2CCF4BD 112121~|~1~|~1~|~01/S>2~|~Widening of SR 63 in Warren County between Union Road and east of the SR 741 Intersection.~|~03 - Reconstruction - Added Capacity~|~404CBBDC2CB80EE6C75A27402ABCC954BA1CBBD4 112121~|~1~|~2~|~02/NFP/ODRC~|~Construction of a new access drive for Warren Correctional Institution (WCI), to be funded by ODRC and constructed as Part 2.~|~01 - New Construction~|~1CFF6BB2F504F0C317DF49DC1FCD805A1F21C42A 93136~|~1~|~2~|~02/NHS/COL~|~FRA-33 paving, SLM 10.79-11.20Columbus urban paving~|~05 - 4R Maintenance - Resurfacing~|~1198D16C5A6790EE8DAE84C700CFE0EB0786DC16 93136~|~1~|~3~|~03/NHS/UARL~|~FRA-33 paving, SLM 11.20-11.37Upper Arlington urban paving~|~05 - 4R Maintenance - Resurfacing~|~7192CA0239600EA9763D550F8551D82E1EDF14DB 93136~|~1~|~1~|~01/NHS~|~FRA-33 paving, SLM 9.33-10.79D6 federal/state funding~|~05 - 4R Maintenance - Resurfacing~|~DCA4C51F19158180B1D4EA29666185E16D0FCA4E 93136~|~1~|~4~|~04/NHS~|~!00% City of Columbus items (ie pavement repair, curb ramps, etc.)~|~05 - 4R Maintenance - Resurfacing~|~E473395E9AF43E46DD2162424963961DE31D55C4 93136~|~1~|~5~|~05/NHS~|~100% City of Upper Arlington items (ie pavement repair, curb ramps, etc.)~|~05 - 4R Maintenance - Resurfacing~|~D5E8482C72A8581D0132F1403236B9732F844E3C 83573~|~1~|~1~|~01/STR~|~Replace deficient culvert over Coldwater Creek on State Route 119 at 0.05 mile West of Junction of State Route 118 SFN 5402050 MER SR 119 0957.~|~10 - Bridge Replacement~|~56F67F768580B67E44C72DD4B4BFAA0304B0CFF0 95225~|~1~|~1~|~01/SAF~|~100% CEAO Safety funding for guardrail replacement on various county roads.~|~21 - Safety~|~38324D20457BBEB1FA2E9AE7402D841E422C31AF 104812~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~47A2D16FA2E4C963781AE66EBE93D043F4A7D3A9 101112~|~1~|~1~|~01/SAE~|~Traffic signal with pedestrian crossing work items eligible for SRTS funding.~|~44 - Other~|~95D6F7F75DF6D9E8F1D37BAA473B1F86D32C3FE2 107788~|~1~|~2~|~02/S<2~|~Resurfacing: LOR-301-19.54 to 21.80 LOCAL 100%~|~~|~1A2361FD478D5D6878211F49B97CE7DD63676DBC 107788~|~1~|~3~|~03/S<2~|~Resurfacing: LOR-301-21.80 to 22.33 FED/STATE 80/20~|~~|~0E39F006A25847E1B3A1710CAE434DC431DA03F0 107788~|~1~|~1~|~01/S5K~|~Resurfacing: LOR-301-19.54 to 21.80 FED/LOCAL 80/20~|~~|~F2FAC47A743F814468FBB6E767FCC6A89C21F3B8 109028~|~1~|~1~|~01/ENH~|~Plan Split for TA funds~|~28 - Facilities for Pedestrians & Bicycles~|~0C17A682ECB18B13774D4B54C9E28B776D09A368 87717~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~80AD31977EAEC6C51BD311A96C6BE919DB4C9F02 83343~|~1~|~1~|~01/BRF~|~This split is for work to replace a bridge not on a federal aid route. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge can use the federal off system BR funds.~|~10 - Bridge Replacement~|~48770D05FE52AE0770945734D7ECC605A6D59C74 115142~|~1~|~1~|~01/S>2~|~Replace culverts~|~~|~5349284F3C5DAC6527C456AD66D540C3CCA457FA 115142~|~1~|~2~|~02/STR~|~Replace Culverts~|~~|~28BF0CA8809DD2BE32448D12321E0BC5CE5EC021 119361~|~1~|~1~|~01/IMS~|~R/W Fence Replacement on LOR-90-10.76 to 18.611~|~44 - Other~|~81628F2080B42B427F41EC3842A5F3D73E21292A 123931~|~1~|~1~|~01/NHS~|~All work included in this split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~093F2D6E3EB71706A84D43ADE3285F05CDD07F21 104059~|~1~|~1~|~01/NFA~|~Landslide repairs at 4 locations.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5DBBA83546ABD2134EC45BC70E2281523D045319 107612~|~1~|~1~|~01/NHS~|~Plan split for WIL-6-1107 bridge replacement~|~04 - Reconstruction - No Added Capacity~|~977D4E581AADE632E47B5FA1B190E91E5DC404E3 99995~|~1~|~1~|~01/IMS~|~Split for bridge sealing work on all structures~|~47 - Bridge Preventive Maintenance~|~FB724007A94DF437601CFCD95AB6F243B7526D9E 99913~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for pavement markings~|~21 - Safety~|~B0760034F77F48CDB453687629A8B067964AF975 98906~|~1~|~1~|~01/NFP~|~Landslide repair project. GAL SR 588 11.43-11.45 in the City of Gallipolis. TID funded project. Agreement number 18613. Funded 100% state TID funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~38629D042F322DD76F67E049A13BE70AE577335A 98906~|~1~|~2~|~02/S<2~|~Landslide repair project. GAL SR 588 11.43-11.45 in the City of Gallipolis. Urban other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5C21298E2D4DEA77BC3ADCE68B954D4921F75BCD 114058~|~1~|~1~|~01/S<2~|~Roadway improvements on Dresden Avenue from Grant Street to Sixth Street. (4B97 Small City Program to provide 95% of the eligible costs, up to a maximum of $500,000)~|~05 - 4R Maintenance - Resurfacing~|~3D96F1BA6F2BC48D7E89BE75EC84CD8243C38383 114378~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State ) - No CAP - Repair of embankment along SR 16.~|~99 - State Preventative Maintenance~|~19E2005BD1B59449264C4E0013DBFD1DC70021F5 93554~|~1~|~2~|~02/NFA~|~100% local funds--watar works etc.~|~~|~AC2DFD4337C6E79EC20811EE57CFEEB35F40B68D 93554~|~1~|~1~|~01/NFA/LOR~|~SRTS project~|~28 - Facilities for Pedestrians & Bicycles~|~B5886D09DF0D6504D18766685C4388E6AB5B4F43 97951~|~1~|~1~|~01/STR~|~SR 117 SLM 0.00 to SLM 3.91 and SR 196 SLM 4.41 to SLM 7.17 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in.)~|~05 - 4R Maintenance - Resurfacing~|~3E49AE5FF07DFD91626B7C2B0C310884AACA615A 98014~|~1~|~2~|~02/STR~|~HIG 134 15.38 (SFN 3602710)~|~04 - Reconstruction - No Added Capacity~|~3407F52EC76D0C89AFB1DB77A83FDBC28EFEBD6E 98014~|~1~|~1~|~01/STR~|~Bridge ReplacementHIG 134 14.42 (SFN 3602672)~|~10 - Bridge Replacement~|~F26AE500D0BAF0748A84E24455EEE61CAEA2743B 123121~|~1~|~1~|~01/BRO~|~Plan split for Bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~5191B6856F8B30E69F70680A79A7273162DA5957 123121~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work at 100% local cost.~|~13 - Bridge Rehabilitation~|~B5BC0DE7A51432487D10995190C9115DE847C519 87148~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 7 0.00-5.21. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~14345F76A8441A5AB075CCE83257D32EDE1ACECE 87148~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 7.74-16.03 and GAL 325 0.00-7.26. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~57698675E29AAA921588A8324E96DB7C5D26095D 103869~|~1~|~1~|~01/SAF~|~Plans split~|~21 - Safety~|~C99262A2425B0735BBB4D497163B3A9B8E044B72 126690~|~1~|~1~|~01/NHS~|~Flatsheet sign replacement project in Athens County.~|~21 - Safety~|~2785582BA529A11BAAB50EDF8D7314BE66F54F51 105205~|~1~|~1~|~01/S>2~|~Plan split for the resurfacing on a portion of HAM-264.~|~05 - 4R Maintenance - Resurfacing~|~FB091BA2F40249701CE775782CA37E8774CC8771 100996~|~1~|~1~|~01/STR~|~Overlay SR 29 and SR 66 in Shelby County: SHE SR 29 SLM 3.82 to 7.64 SHE SR 66 SLM 6.42 to 8.08~|~05 - 4R Maintenance - Resurfacing~|~85FBF8600B18A49C174707429E7B48D099B11F43 117050~|~1~|~1~|~01/NFA~|~Created for J&C Involvement.~|~44 - Other~|~D4B81D23C6B4E9C4829797027C61596D2842A140 111208~|~1~|~1~|~01/MPO~|~MPO funded Plan split~|~05 - 4R Maintenance - Resurfacing~|~295F9A23614870F01C452FA45EAAA0CE818BAACD 95229~|~1~|~2~|~02/SAF~|~Added plan split for 100% LNTP costs above max federal funds~|~17 - Construction Engineering~|~1C36D66A8F4779551559AD67F1EDE22C7AABEE7F 95229~|~1~|~1~|~01/SAF~|~100% CEAO Safety funds for gruardrail replacement on various county routes.~|~21 - Safety~|~3E7BAAFD057169ACE47225717EA26B8B28BB2D0F 115606~|~1~|~1~|~01/SAE~|~Diamond grooving from Mus IR 70-1.70 to the 2.00 to enhance traction on the Interstate~|~21 - Safety~|~5387852B93A379DBDC0063F5793C04FF6AC79F8B 106557~|~1~|~1~|~01/NFP~|~Plan split~|~44 - Other~|~2F49F3838B84D8F12A189EDCB824CD63D120246D 107537~|~1~|~1~|~01/NFA~|~Resurfacing BEL-379~|~05 - 4R Maintenance - Resurfacing~|~BBA4338E80405684B38EF4352526AEF5FE0F7B0C 94003~|~1~|~1~|~01/BRF~|~Work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. Part of the Ohio Bridge Partnership Program. 100% federal funds up to the cap amount. Funds needed over the cap to be provided by Defiance County.~|~10 - Bridge Replacement~|~E11E7818C632A1FEEA998088FCE05BE19A53D468 96074~|~1~|~1~|~01/STR~|~"01/STR/OT/ " plan split for the construction of a new equipment wash bay at the existing Perry County Garage~|~44 - Other~|~71A4B0617940574D77940987FA93CE1412A3FFCF 84333~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 78 30.62-36.83. Rural other federal aid split 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~91F219F71BBD925B647BC9FF74843434FB3A4FFA 116137~|~1~|~1~|~01/SAF~|~Implement a Turbo Lane at the intersection of US 23 and Trego Creek Rd.~|~21 - Safety~|~C5A905F18BE2F629787D49894AC025E9ACA78795 104823~|~1~|~1~|~01/MPO~|~Resurfacing Belden Village St.~|~05 - 4R Maintenance - Resurfacing~|~AF5C3424FCADF40454F729ED39861059AE7A0B7C 96451~|~1~|~1~|~01/MPO~|~Renovate east facade and portions of north and south walls of the Richland County Garage.~|~32 - Historic Preservation~|~275C89896DE67CDA8A5F3CAF978221D5A9C8B859 96451~|~1~|~2~|~02/ENH~|~100% local items.~|~32 - Historic Preservation~|~7BE0E5626F2E25F1F82DB15340F008B28B6FC524 126734~|~1~|~1~|~01/MPO/WARR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0F4AFEE8D65B5A43C21CB1374DD673797F28AF97 102790~|~1~|~1~|~01/IMS~|~This plan split is for work on Interstate bridge.~|~10 - Bridge Replacement~|~3B3A9EBCE4A75CFF82434F49EAAD183409C5EC23 102790~|~1~|~2~|~02/S>2~|~This plan split is for removal of the bridge over HAM-22/Gilbert Ave.~|~40 - Special Bridge~|~1BC591B25B1A1139456FFF35B504B8CB3BE2C663 101246~|~1~|~2~|~02/STR~|~Fine graded polymer AC overlay on UNI-739-0.58 to 0.63, UNI-739IC-0.00 to 0.06, UNI-287-0.58 to 0.73~|~05 - 4R Maintenance - Resurfacing~|~1DA826B0DA5EA07811B30BC3A2582197A236EBE2 101246~|~1~|~1~|~01/NHS~|~Resurfacing UNI US 33 from 0.00-8.78, and FGP AC overlay on UNI SR 739 0.28 to 0.58~|~05 - 4R Maintenance - Resurfacing~|~A405C13CE9A8D4E37821B0660E1B4B63AFD9B1D5 101246~|~1~|~3~|~03/NFA~|~Fine graded polymer AC overlay on UNI-287-0.00 to 0.58~|~05 - 4R Maintenance - Resurfacing~|~0C9F2C3CB021B7FD4654132D57DC98B6E17CF0A7 88904~|~1~|~1~|~01/NHS~|~Replace the esxisting superstructure on Bridge (HAS-22-2126, SFN 3401200) with new steel beam superstructure, and repair substructure units as needed. Slope protection will be needed under the scuppers at the forward abutment.~|~13 - Bridge Rehabilitation~|~68EF85AFB697210826F7A68937D3C24FFDF6ECDB 115926~|~1~|~1~|~01/MPO~|~Install traffic signal at the intersection of King Rd and the University Parks Trail, will signal activation for pedestrians and detection for bicycles.~|~21 - Safety~|~74A164A714908DA3BAA32A6924FD315B66316E33 118757~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement~|~~|~362175C67EDF67F950CCEAC478F3CAA6D2FDB033 125393~|~1~|~1~|~01/IMS~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~924A6F1EE5FAE6D8771075D4F755F54569A75BDA 99972~|~1~|~1~|~01/NHS~|~Plan split for BR eligible work on this structure at 80/20 fed/state.~|~13 - Bridge Rehabilitation~|~322D84939FD9507BB446E3712773178F8614D683 125983~|~1~|~1~|~01/IMS~|~All work included in this split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9EDA350301F0B55D1E132B00B03630FA95363CA1 109762~|~1~|~1~|~01/IMS~|~Fine Graded Polymer Modified Asphalt Concrete~|~17 - Construction Engineering~|~BEC5C21696D88768A784C4DC88D1472023EDD5D8 101155~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~FB44789042F97E212EF414AC1A61A11AF4F62F47 101155~|~1~|~1~|~01/NHS~|~AC Overlay with repairs.~|~05 - 4R Maintenance - Resurfacing~|~C36801C78E45513F2B956EBD88694AAE36A22ADB 95807~|~1~|~1~|~01/NFA~|~Not on the federal aid system, BEL-147-14.29 and various other sites for culvert repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~BB244085E2D1A4C12223AEE2A1ADA4A5840332B1 90797~|~1~|~1~|~01/NFA~|~Intersection reconstruction to add left turn lane in all four approaches. The final configuratio will be curbed with 11' lanes and a back to back curb width of 36'. Storm sewers are included at the intersection of Chambersburg Road and Bellefontaine Road.~|~04 - Reconstruction - No Added Capacity~|~4733022B5BFA33A2AB45BBB7095FD5010C469691 113726~|~1~|~1~|~01/CMQ~|~Split for work on this project using CMAQ funding.~|~44 - Other~|~952EB8FA50D63AB023E05ADE4F46F96167511E53 126194~|~1~|~1~|~01/NFP~|~CO CO Plan Split ~|~21 - Safety~|~4AC689991C2C7C10A3C86DCDB23F6066B0E59733 109628~|~1~|~1~|~01/S<2~|~Resurfacing SR 647 from SLM 1.62 to 2.47~|~05 - 4R Maintenance - Resurfacing~|~216C925547C3D32C7AE6490E54B784BBF4904E58 109628~|~1~|~2~|~02/STR~|~Resurfacing SR 647 from SLM 2.47 to 8.09~|~05 - 4R Maintenance - Resurfacing~|~9CB9FDB5E0A7B6B88A884712B60AB04757AC5518 103698~|~1~|~2~|~02/S<2~|~Concrete deck overlay project. HOC CR 418 0.60, SFN 3703909. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~475F5DBFA4257001874FB69E98F28FD1B3C2A7CF 103698~|~1~|~1~|~01/NHS~|~Concrete deck overlay project. HOC 33 8.30, SFN 3700429. NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~F42407D32664F26062E3D1F7B6B2EB5DAB83B44F 114309~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP/OT/ " District Preservation Funding - 4CP7 (100% State) - No CAP - Ding-N-Dent Guardrail repair District Wide~|~21 - Safety~|~0E5E450AF2A1B52334F6AD18A85280504E4DFFDE 121383~|~1~|~1~|~01/NFA~|~Muskingum County Engineer's FY2029 pavement marking project funded by CEAO - 4HB7 @ 100% capped at $300,000. ~|~21 - Safety~|~30F11D19384BAC2C4186FD4966AF025C661D92C8 84601~|~1~|~2~|~02/STR~|~Bridge work on MAH-US224 SFN 5004535, 5004608, 5004616 and MAH-534 SFN 5005809, 5005833, 5005892~|~13 - Bridge Rehabilitation~|~39EC125D9CA07A2E2EA07FD408B42164ADC0A5AF 84601~|~1~|~3~|~03/IMS~|~Bridge work on SFN 5005914 MAH-SR 534-2.84 over I 76.~|~13 - Bridge Rehabilitation~|~86A8E3AC5FF2958707E21BD8C97E9F1259B42D5D 84601~|~1~|~1~|~01/STR~|~Resurfacing in:MAH-224 from SLM 0.00-2.88 POR-224 from 18.67-21.22 and MAH-534 from 8.50-16.31 and TRU-534 from 0.00-7.50~|~05 - 4R Maintenance - Resurfacing~|~9B34D837AEC91BB8B92E40BBC7D27BA9F0847338 99587~|~1~|~1~|~01/STR~|~STP Rural~|~05 - 4R Maintenance - Resurfacing~|~6CC551BD43063264ED90748E0E8A21735C2DD712 103107~|~1~|~1~|~01/NFA~|~The Village of Paulding proposes new northbound (211' long including diverging taper) and southbound (161' long including diverging taper) turn lanes on US127 at the intersection of Gasser Road / Dooley Drive.~|~01 - New Construction~|~A923E60596511DEA874072308DCF9799183F3454 104786~|~1~|~1~|~01/CMQ/NEWA~|~LCATS/City of Newark CMAQ Funding - 4TB7/LC05 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Minor widening on Lic-CR 804-0.96 to 1.29 to accommodate the addition of Two Way Left Turn Lane (TWLTL) on Church Street from Green Wave Drive to 29th Street in the City of Newark.~|~04 - Reconstruction - No Added Capacity~|~09D0E16D26659F8496548FDD8A478D6939394FD7 126959~|~1~|~1~|~01/SAF~|~Old 3C Highway and Socialville-Fosters Rd roundabout~|~21 - Safety~|~244A1D0E3870169D1A1078B2727D09EE71415EB7 125970~|~1~|~1~|~01/NHS~|~Plan split for installation of safety netting on suspension span~|~48 - Bridge Protection~|~9AA60B9AD30F9C97CFCF9B18BF367F7E250DB18C 123647~|~1~|~1~|~01/NFP~|~Plan split for district wide mowing work~|~99 - State Preventative Maintenance~|~424F13EB6CF158340D59EF7FBC641D38BDF3A9C0 126017~|~1~|~1~|~01/NHS~|~funding event~|~05 - 4R Maintenance - Resurfacing~|~EF8DFA6205C17AE5A2D750EF1D83540BD525C71A 113153~|~1~|~1~|~01/BRF~|~Replace structure > 20' span.~|~10 - Bridge Replacement~|~FAEF6FEC96965B7DEC9563798BA30C127AC1DD65 95514~|~1~|~1~|~01/NFA~|~Reconstruction of Historic Convered Bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~5F1C090DCF0C7E71DA2A95BFFECC620D85301D55 106327~|~1~|~1~|~01/NFA~|~Plan Split~|~17 - Construction Engineering~|~81CD9DFFB6CF4009C64A61076B6B4EF6F159D3B5 101110~|~1~|~1~|~01/STR~|~Chip seal ~|~05 - 4R Maintenance - Resurfacing~|~3E92C3DE6F0077CAAB197D5BB8CF6DF21B21B868 101110~|~1~|~2~|~02/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~B579FFED40ABA5B1DFA0BFABB173C0B3B166AE6E 101110~|~1~|~3~|~03/S<2~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~D65624F5BE0FD5C72E02A9267B0D82918D57D0C0 87700~|~1~|~1~|~01/S<2~|~District Allocation~|~99 - State Preventative Maintenance~|~5E81364C63853DDD3FB89CD386D3747D72E76110 105084~|~1~|~1~|~01/NFP~|~This is the district?s systematic RPM replacement maintenance project.~|~21 - Safety~|~5C794DCAAA7A9B93926484D24D054F9E6F1499AF 112225~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair contract in Franklin County~|~44 - Other~|~5C27053354E81F07ED3CAB77094C0BD73759FFD6 93815~|~1~|~1~|~01/STR~|~Resurfacing of Riverview Road (CR-9) in Boston Township. From SLM12.40 (Peninsula Corp) to SLM 13.35 (Boston Mills Road).~|~05 - 4R Maintenance - Resurfacing~|~3EF9EBFDC1A780054B9D61804EBDC1C06E5DB95A 101005~|~1~|~1~|~01/STR~|~Pavement marking work funded with rural STP funds. Work in Allen County on SR 12, SR 103, SR 196 and SR 696. Work in Defiance County on SR 2, SR 49, US 127 and SR 249. Work in Hancock County on SR 103 and SR 186. Work in Hardin County on SR 37, SR 117 and SR 273. All work in Paulding County not on US 24 or US 30. Work in Putnam County on SR 12, SR 66, SR 108, SR 114, SR 115, SR 189, SR 190, SR 613 and SR 696. Work in Van Wert County on SR 49, SR 66, SR 81, SR 117, SR 637, SR 697 and SR 709. Work in Wyandot County on SR 37, SR 103, SR 568 and SR 587. Funding is 100% federal funds SAC 4PF7.~|~21 - Safety~|~1DD00E4D78D4148778FD4F5851EF0A7006C29414 101005~|~1~|~2~|~02/NHS~|~Pavement marking work on the Interstate system. All work on US 23, US 24, US 30 and US 33. All work on SR 12 in Hancock County from the City of Findlay to the east. All work on the the 4-lane section of US 68 in Hancock County which is from 12.84 to 14.64. All work on the 4-lane section of SR 15 in Hancock County which is from 17.28 to 28.24. All work on SR 15 in Wyandot County. Funding is 100% federal funds SAC 4PF7.~|~21 - Safety~|~A1561867B6174BB3316037C2DC7940E7E0E8A040 101005~|~1~|~4~|~04/SAE~|~Pavement markings for the wrong way drivers on US 30 in Paulding County and Van Wert County. 100% federal funds provided by the Safety Program. Funds needed over the cap provided by the District.~|~21 - Safety~|~3F03B3154B06CDD8043EB03D8D241A3A393B259B 101005~|~1~|~3~|~03/NFP~|~Pavement markings work funding with 100% state funds. All work not covered in other plan splits will be in this plan split. This includes work on minor collectors which are not eligible for federal aid and routes where the work would be split between rural and urban STP as well as any work involving Interstate 75.~|~21 - Safety~|~CD7D86391E07FB1CECBBFEA3E7DA33C42AF20184 109239~|~1~|~1~|~01/STR~|~Culvert Replacement at ERI SR 0099 01.94~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3C5C1173D0191FDF348E109F029CBCAA1C96DD3B 89251~|~1~|~1~|~01/ENH/COSH~|~"01/ENH/OT/COSH" - Cap $660,000 - Coshocton Lake Park~|~13 - Bridge Rehabilitation~|~D2735FD853AB04536C57D68360019CF7A3B5806F 106699~|~1~|~1~|~01/NFP~|~Work to rehab a bridge. Funds from the Federal/State Exchange Program with the match provided by the Wyandot County Engineer.~|~13 - Bridge Rehabilitation~|~892B8AD872A8E7A4BC59A461D2225B1DA1A2C5CC 99457~|~1~|~1~|~01/STR~|~DSR# TUS-008~|~04 - Reconstruction - No Added Capacity~|~D9BEEF473BBF87BCA3E4B07EC073B17956951FC1 105266~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~DF99E2346E535C6B199729D54A51CA142BC481AB 105773~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 13 6.31. Type A Emergency. Rural other federal aid funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F8D559C0903972B4688729E9EDB7D4297A7BD754 121313~|~1~|~1~|~01/NHS~|~Split for resurfacing~|~05 - 4R Maintenance - Resurfacing~|~3CF27DD8DF8F435DEDB784ADC66E0A21E5F2F2CC 97798~|~1~|~1~|~01/IMS~|~SFNs 5502918 & 5502942 MIA-75-1415L/R - Remove and replace twin mainline bridges including minimal approach work.~|~10 - Bridge Replacement~|~8460677EC15D14C5DF3F7E24F50DF47345F8652B 97798~|~1~|~2~|~02/IMS~|~SFNs 5503000 & 5502977, MIA 75 1457 L/R -Remove wearing surface and replace with a latex modified concrete. Widen outside shoulder to 12'.~|~13 - Bridge Rehabilitation~|~EA0C2C6174811CC7C963F1299D9C11B02AF38A8E 79666~|~1~|~1~|~01/IMS~|~Four lane resurfacing on I-270 from SLM 48.47-52.71 (Pavement Break east of Alum Creek Dr to FWD Approach Slab of US23 bridges.)~|~05 - 4R Maintenance - Resurfacing~|~F4E150C92AE4FE5B1B9CC5ED7B249A04A6041C62 79666~|~1~|~2~|~02/IMS~|~SDC Deck Overlay & Deck Edge and Parapet Replacement on 1 structure:2513595 FRA-270-50.90 LockbournePier Patching on 2 structures:2513862 FRA-270-49.00 Alum Cr Dr SB2513560 FRA-270-51.93 Parsons Ave~|~13 - Bridge Rehabilitation~|~ADDA1B3A11A47870D19138428EBB4E0AE59FA280 97033~|~1~|~2~|~02/S<2~|~Intersection improvement project. Intersection of WAS 32 10.44-10.57/WAS 618 6.16-6.23 (Belpre-Pkg Bridge/SR 618). Work includes signal replacement and mill and fill. Funded 80 federal/20 local CMAQ and 90 federal/10 state Safety.~|~21 - Safety~|~E7C07ACEAE37343F2A8BD1F928AF7FF41AF7C85A 97033~|~1~|~1~|~01/NHS~|~Intersection improvement project. Intersection of WAS 32 9.41-9.77/WAS 618 7.00-7.04 (Toll Bridge/SR 618). Funded 80 federal/20 local MPO and 80 federal/20 local Safety.~|~21 - Safety~|~DE438DCE8B4424FD2998DDD1EEB48C8BC675437E 118741~|~1~|~1~|~01/SAF~|~Safety improvement project in Scioto County~|~21 - Safety~|~51DAAD762CBCE730270C042C25F69F73D01FD3C2 91512~|~1~|~1~|~01/S<2/Lon~|~London urban paving of SR 38, SLM 13.88-15.19~|~17 - Construction Engineering~|~7ABD77632494073A8B3C1F69C2F3A73634EC71B4 91512~|~1~|~4~|~04/NHS/Lon~|~MAD US 42 5.92 to 7.10 Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~74372AF9C45B7B5AB5FEF0145DFF4A028E3524A9 91512~|~1~|~2~|~02/S<2~|~General system resurfacing of SR-38, SLM 15.19-16.28~|~05 - 4R Maintenance - Resurfacing~|~647BC8A62EC410DDC69B2806399B87E97C4FDCD2 91512~|~1~|~3~|~03/STR~|~General system paving of SR-38 from SLM 16.28-21.56~|~05 - 4R Maintenance - Resurfacing~|~C9037B89907A42843B4977AF9418155623D21921 91512~|~1~|~5~|~05/NHS~|~100% City of London items not eligible for urban paving~|~05 - 4R Maintenance - Resurfacing~|~DC7C2661D05BD1E3B4535E4E702E0603C346989A 126772~|~1~|~1~|~01/SAF/HAS~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~CDA6F6135A70135077529A4B710BEC6CB55CF820 120189~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~9DA74A4401D09CF793EC8000D22CD8BF287FE8E2 75909~|~1~|~1~|~01/IMS~|~Preventative Maintenance on the Priority System for FY2013. Work includes resfurfacing the ramps at the interchange of Sharon Rd. and HAM-75 and Indian Ripple and GRE-675~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5F4C7B9E98909D09382F90DB997EBBC4F405D17E 88740~|~1~|~1~|~01/IMS~|~Raised pavement markings on: MIA IR 75 0.00 to 19.95 MOT IR 70 0.000 to 13.870 SHE IR 75 0.000 to 20.550;Raised pavement markers on: AUG SR 198 2.67 to 3.19 CHP US 36 13.84 to 16.13 CHP US 36 16.13 to 17.18 CLA SR 235 3.95 to 5.54 CLA SR 235 0.00 to 2.57 MER SR 118 8.39 to 10.39 MIA US 36 7.21 to 7.87 MIA SR 718 8.16 to 10.19 MO... moreRaised pavement markers on: AUG SR 198 2.67 to 3.19 CHP US 36 13.84 to 16.13 CHP US 36 16.13 to 17.18 CLA SR 235 3.95 to 5.54 CLA SR 235 0.00 to 2.57 MER SR 118 8.39 to 10.39 MIA US 36 7.21 to 7.87 MIA SR 718 8.16 to 10.19 MOT US 35 6.16 to 10.32;Raised pavement markers on: AUG SR 198 3.19 to 4.85 CHP US 36 6.99 to 13.84 CHP US 36 17.18 to 19.48 CHP SR 55 0.00 to 11.65 CLA SR 235 2.57 to 3.95 CLA SR 235 5.54 to 11.82 DAR US 36 0.00 to 8.54 DAR SR 47 11.16 to 18.14 LOG SR 274 15.78 to 22.64 MER SR 29 8.17 to 9.17 MER SR 118 5.47 to 8.39 MER SR 118 10.39 to 13.42 MER SR 118 14.42 to 24.15 MER SR 118 24.70 to 27.09 MIA US 36 0.00 to 7.21 MIA SR 718 0.00 to 8.16 MOT US 35 0.00 to 6.16 MOT SR 123 0.00 to 2.08 SHE SR 589 0.00 to 4.70;Raised pavement markers on: CLA SR 235 0.00 to 2.57 MIA SR 718 8.16 to 10.19 MOT US 35 6.16 to 10.32;Raised pavement markers on: AUG SR 198 2.67 to 3.19 CHP US 36 13.84 to 16.13 CHP US 36 16.13 to 17.18 CLA SR 235 3.95 to 5.54 CLA SR 235 0.00 to 2.57 MER SR 118 8.39 to 10.39 MIA US 36 7.21 to 7.87 MIA SR 718 8.16 to 10.19 MOT US 35 6.16 to 10.32~|~21 - Safety~|~BEC092A1D79D960076081B67EA9138C3CF43A5ED 122222~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-80-E~|~~|~285AB3941F3D40F7DF19D22412C9AB09F5B08111 113176~|~1~|~1~|~01/MPO~|~Resurfacing of Swartz Rd from S Main St to Glenmount Ave.~|~05 - 4R Maintenance - Resurfacing~|~44B4097CFF0C8D3BD5172A11368893F2E539DA2C 101567~|~1~|~1~|~01/NFA~|~This project is for Construction Inspection FY16~|~17 - Construction Engineering~|~46736580C9F9D993A4F1A178E50BE3B52594F71E 101567~|~2~|~2~|~02/NFA~|~This project is for Construction Inspection FY17~|~17 - Construction Engineering~|~E6CAF355C897BB62E1668EEF7FC19EF81BBB84DA 106163~|~1~|~1~|~01/IMS~|~Plan split~|~13 - Bridge Rehabilitation~|~C18F3D4C974B9B2622814D75261DB554DB36F0E1 112691~|~1~|~1~|~01/NHS~|~Federal/Local Urbanized Area Inside Corp. Limit US 20(Paving Items):~|~05 - 4R Maintenance - Resurfacing~|~D3C478448B68A47F934AF95CE0D1155EE3E5F7DA 112691~|~1~|~2~|~02/S5K~|~Resurfacing on LOR SR 301 inside Corp limit. Paving items.~|~05 - 4R Maintenance - Resurfacing~|~CC981E71CB3F730EFA704F999932390274667065 112691~|~1~|~3~|~03/NFP~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):~|~05 - 4R Maintenance - Resurfacing~|~A97E267491765E8D064FC82CF276278B6E3D1993 112691~|~1~|~4~|~04/BRO~|~Bridge approach slap repair.~|~47 - Bridge Preventive Maintenance~|~BEA8ECBAB076ED930D052E4E4C0EC1D4E3BEB88E 112691~|~1~|~5~|~05/SAF~|~Safety hazards including substandard guardrail and unprotected fixed objects in the clear zone. SLM: 16.98 (US 20 North of Chestnut Ridge Rd.)SLM: 18.95 (US 20 South of structures 4702670 AND 4702700). All the items in the median column SLM: 19.19 (US 20 North of structures 4702670 AND 4702700). All the items in the median column ~|~05 - 4R Maintenance - Resurfacing~|~7BF8B8E5857965D0E651C96BAF04A0DD52E4991A 112691~|~1~|~6~|~06/NFA~|~D-wall, SLM: 19.56 (SR 301 under the turnpike bridge) ~|~05 - 4R Maintenance - Resurfacing~|~973F9997D7A3A82F041883712A3D535C5CECC7C7 90361~|~1~|~1~|~01/TRN/Cant~|~Streetscape/economic development project to improve traffic flow and safety. Address roadway pavement, curbs, sidewalks, ramps, crosswalks, lights, and signals. In the City of Canton, Stark County, Ohio.~|~44 - Other~|~246C5DFC4D0407FB03A59F831179EEAE943050AC 90361~|~2~|~2~|~02/NHS/Cant~|~Resurfacing from Harmont Avenue to Canton East Corporation limit. In the City of Canton, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~82A268A085C8C59203B6BAE4B7A43CAE8F77B102 95601~|~1~|~1~|~01/NHS~|~It is propsoed to resurface with asphalt concrete US35 beginning 0.16 mile east of CR71 (Lloyds Brdg Rd.) (US34 SLM 8.35) head east for 4.88 miles and terminate 0.03 mile west of the SR32 ramp (US35 SLM 13.23).80/20 split~|~05 - 4R Maintenance - Resurfacing~|~0B2341491177343A78CC2D4F73342B059A0854C3 111841~|~1~|~1~|~01/SAF~|~Signal reconstruction at South/Main and South/Locust, signal timing and coordination, convert South/Sugartree to AWSC and add curb bumpouts, pavement markings and pedestrian upgrades~|~21 - Safety~|~54D23024E286BA9C90579BD821030D45588BDA65 88894~|~1~|~1~|~01/STR~|~Resurfacing SR183 0.00-2.48 and US224 12.99-13.51~|~05 - 4R Maintenance - Resurfacing~|~8ECD471AAB7A611EE5E7AAB4EE37FACE04B0E98E 88894~|~1~|~2~|~02/STR~|~not BR Eligible: SFN 6703674 US224 13.18~|~13 - Bridge Rehabilitation~|~F5AB66A7DB837AFD482296DADE9CBF33841AEAA3 100357~|~1~|~2~|~02/S<2~|~Overlay SR 118 with fine grade aggregate MER SR 118 9.89 - 10.39~|~05 - 4R Maintenance - Resurfacing~|~D40013A2094500865844019DD1CE4B5DD38F9F18 100357~|~1~|~1~|~01/STR~|~Overlay SR 49 & SR 118 with fine graded aggregate. MER SR 49 0.00 - 3.52 MER SR 49 13.91 - 21.45 MER SR 118 10.39 - 13.42 MER SR 118 17.98 - 21.99~|~05 - 4R Maintenance - Resurfacing~|~151FDBCE18EE74446E832B43A35B4E7462C58F70 112810~|~1~|~3~|~03/STR~|~Resurfacing SR 644~|~05 - 4R Maintenance - Resurfacing~|~054BC8973EB12353FB6E8349BBA2949716E0E0D6 112810~|~1~|~1~|~01/S<2~|~Asphalt resurfacing of COL-164 from SLM 15.72 to SLM 16.87~|~05 - 4R Maintenance - Resurfacing~|~44C0A8A371F3F0772B08CA7A6937B4F084BDFF26 112810~|~1~|~2~|~02/NFA~|~Resurfacing COL-164 from SLM 16.87 to SLM 18.00~|~05 - 4R Maintenance - Resurfacing~|~6AAAC2E80E12F3ED1C5C08762895C4D9EF937DE2 104815~|~1~|~1~|~01/S>2~|~Resurfacing in the City of Springfield.~|~~|~07D8285B25FC635791D37A135B10B373E006F6BA 102935~|~1~|~1~|~01/IMS~|~Plan Split for the interstate routes~|~99 - State Preventative Maintenance~|~2010DF4712B3EE09237ACACEEE22779AE4400790 102935~|~1~|~3~|~03/STR~|~Plan split for the rural routes~|~99 - State Preventative Maintenance~|~C0F2C632FE9B600702330137BFF80D8FDD8FE697 102935~|~1~|~4~|~04/S5K~|~Plan Split for the small urban routes~|~99 - State Preventative Maintenance~|~6AF3076EFD0A25389F8DB93B4A73D60B791E723B 102935~|~1~|~2~|~02/S>2~|~Plan Split for the large urban routes in the project~|~99 - State Preventative Maintenance~|~894138B96E360FAF06ECFCAD111A57C3C61FA5D0 125177~|~1~|~1~|~01/SAF~|~District wide raised pavement markings~|~21 - Safety~|~ABB52DF763559DF6FB5D7CBD5C77B0F60A08AADE 101459~|~1~|~1~|~01/STR~|~DSR# JEF-007~|~04 - Reconstruction - No Added Capacity~|~C5D435556C61FD8B16F6D578E0F88AC80001A82A 104704~|~1~|~1~|~01/SAF~|~Reconstruct signal, add eastbound/southbound right-turn lanes and a SUP from Durrow to Georgesville~|~21 - Safety~|~A651AA246C024D3706C91BAE45242DAC14ABA96D 104704~|~1~|~2~|~02/SAF~|~BETHEL ROAD AT DIERKER ROAD~|~21 - Safety~|~20FE96240756F98DE55ECBFC4B43D355595B7148 124676~|~1~|~1~|~01/SAF~|~Plan Split 1, CEAO safety funding~|~04 - Reconstruction - No Added Capacity~|~1E7B961057860911BB565D0171FEE71CA66EBC09 98177~|~1~|~1~|~01/STR~|~Replace structure MAD-29-7.03 over Dun Ditch~|~10 - Bridge Replacement~|~8BFB77EC89AFF04D481F2A250FA8372CAEFB02A6 103807~|~1~|~1~|~01/NFA~|~The County will Construct approximately 3150 feet of new 2/3 lane roadway known as a public road A and public road B. Widening US23 to accommodate a new northbound right turn lane at the new public road B, extending the existing northbound right turn lane on US23 at Pittsburgh Road.~|~01 - New Construction~|~32FB59368181C5B0948389951E6B579631AF0731 124845~|~1~|~1~|~01/BRO~|~Posted Single span box beam super replacement.~|~13 - Bridge Rehabilitation~|~7A0BEB72E6931439A55EC83E04FA5ED2A30114FA 117537~|~1~|~1~|~01/SAF~|~Plan split for eligible safety related pedestrian improvements in the City of Cleveland.~|~21 - Safety~|~C4EC2C72D122AA746B709C48AD67771503FC8D8F 117537~|~1~|~2~|~02/SAF~|~Plan split for eligible safety related pedestrian improvements in the City of Euclid.~|~21 - Safety~|~ACF26BDD811146C0D33CAF582245A24A376B04D8 117537~|~1~|~3~|~03/SAF~|~Plan split for eligible safety related pedestrian improvements in the City of Lorain.~|~21 - Safety~|~A4911907995ED0B917458D8FEBCF40105A6357F1 102920~|~1~|~1~|~01/BRO~|~Bridges~|~13 - Bridge Rehabilitation~|~EAEBB27A238ADA3E653FCDBAD7AEC3782476ECDB 116166~|~1~|~1~|~01/STR~|~Landslide repair. MOE 537 0.32.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B5DD137368D04F1119CF9815C6EDBBE5859611D4 89103~|~1~|~1~|~01/SAF~|~Upgrade existing signing and sign supports along US 35 in Greene County~|~~|~B42A1F9C0AAF06D816B9D619E28DC8D9A93F84E1 76431~|~1~|~3~|~03/NHS/PATA~|~"03/NHS/OT/PATA" - 100% City of Pataskala - No CAP - for the costs of ADA ramps and any other City requested items on Lic-SR 16-00.00 to 07.22~|~05 - 4R Maintenance - Resurfacing~|~1784B61B52A1FBE2CE76EF1CA942569E50DFC4B5 76431~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation - No CAP - Lic-SR 16-07.22 to 14.10 - Treatment equals 5% Surface Repair, 1-1/4" Mill; 1-3/4" Item 442 Intermediate course and 1-1/2" Item 442 Surface coat~|~05 - 4R Maintenance - Resurfacing~|~6E64445CB469A120AD47D56268B0D5AF1734FE46 76431~|~1~|~1~|~01/NHS/PATA~|~"01/NHS/PV/PATA" - Urban Paving in the City of Pataskala - 80% District Preservation and 20% Local - No CAP - Surface Treatment = 5% Surface Repair, 1-1/4" Mill; 1-3/4" Item 442 Intermediate course and 1-1/2" Item 442 Surface coat~|~05 - 4R Maintenance - Resurfacing~|~878507E4365F34422A0D5D234E10FA737AFD6D4A 92601~|~1~|~1~|~01/NHS~|~Split for all paving work.~|~05 - 4R Maintenance - Resurfacing~|~166276F264AAC0BD35614FF2448201EBF66BC6DE 96858~|~1~|~1~|~01/SAE~|~Install and replace/upgrade guardrail on various county roads.~|~21 - Safety~|~06E544E93C4572022CED33E75829CE5E2B9F9C4D 122973~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~079672A99D3D89A6F300F851C8E4D73E36D374E1 109720~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~EB704AB8969B83D660B272103CF1C276AA6F4B66 125793~|~1~|~1~|~01/NHS~|~GAL US 35 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~026B09EF556A2A4BFB6B2164D1A3752FE2793E3B 95485~|~1~|~1~|~01/MPO~|~Shared use path along N Lake to Cooper Foster and Oak Point; along Cooper Foster from N Lake to LCMP Mercy Recreation & Health Center.~|~28 - Facilities for Pedestrians & Bicycles~|~3B03E9BDFD08EA8EA21C0C3F80856045ED9F6DCC 95485~|~1~|~2~|~02/ENH~|~100% local items.~|~28 - Facilities for Pedestrians & Bicycles~|~1A1CAE70B128D2926BF5BA5C8FE82E8EB2D7A70A 102354~|~1~|~1~|~01/STR~|~Concrete deck replacement. ATH 13 0687 (SFN 0500186). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~D46D2B81848FDAD80D27F5655AA45AE4513114A3 108632~|~1~|~1~|~01/NHS~|~Repair 3 catch basins.~|~~|~8BA96A6BC8F5F143B33E5AFA44C65323602AEEA5 88569~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete USR 35 SLM 0.00 to 2.98USR 35 SLM 5.75 to 6.16 Classification = OM99999~|~05 - 4R Maintenance - Resurfacing~|~2A0D2A7A9E0C3415388A14575C41EF53A1181BC4 88569~|~1~|~2~|~02/NHS~|~Overlay with asphalt concrete USR 35 SLM 6.16 to 9.10 Classification = NP22528~|~05 - 4R Maintenance - Resurfacing~|~D8B69FA67D416A429447E676FF5DFEB80EA6966B 112920~|~1~|~4~|~04/SAF~|~Centerline Rumble Stripes~|~21 - Safety~|~1CF6E5A03BE49B0E93727D74781FC5995ECD1AB3 112920~|~1~|~3~|~03/NHS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~57203D84F68A29AB6DDB6749D694B0AEB8933CF4 112920~|~1~|~2~|~02/NFA~|~ADA 247 0.00-0.35~|~05 - 4R Maintenance - Resurfacing~|~002675B52DB34039C2F63DE23504FC7770A400D5 112920~|~1~|~1~|~01/NHS~|~ADA 52 8.29-16.14 Overlay~|~05 - 4R Maintenance - Resurfacing~|~1BB9E685D06CEE9B7C213F357510C6458B8FAAD5 108665~|~1~|~1~|~01/NHS~|~Plan split pavement reconstruction from SR-2 to Townline Road~|~04 - Reconstruction - No Added Capacity~|~C8C0D053B915ED03F688F6018FA5123BBEAF5D12 108665~|~1~|~3~|~03/NHS~|~Plan split for drainage upsizing, PROTECT funds eligible for size increase~|~66 - Resilience Improvement - Highway Project ~|~45EF7C30D521B6C11EF74B3CF4FE57C393892060 108665~|~1~|~2~|~02/NHS~|~Installation of combination curb and gutter and New drainage items, 100% eligible for PROTECT funding.~|~66 - Resilience Improvement - Highway Project ~|~2B2D0751B407BAC10839796874E4BF6596461642 108665~|~1~|~4~|~04/NFA~|~Creating split for utility conflicts in construction.~|~66 - Resilience Improvement - Highway Project ~|~9F9CFA7C3FCAFCD22CCAFB4D07B7A8868337D0EE 97370~|~1~|~1~|~01/IMS~|~Highway signs~|~44 - Other~|~7DF3CF0F07262243D7A87D671E152B9DB1D9D43F 116790~|~1~|~1~|~01/STR~|~Items associated with the culvert work~|~44 - Other~|~C45D3E8FF497EEF49D6C11AABF2A49203C68A78E 100640~|~1~|~1~|~01/STR~|~Plan split for the Rural portion of the project~|~05 - 4R Maintenance - Resurfacing~|~90E853215AD4B619BDB121926D2E380F64839A3E 100640~|~1~|~2~|~02/S5K~|~Plan split for the Small Urban portion of the project~|~05 - 4R Maintenance - Resurfacing~|~DE438F8F383FEDD6712C5FC37B6D1721637FD615 103499~|~1~|~1~|~01/STR~|~OH16-01, BEL-005~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~85B60A91F56CC3DC87CF544EF0678D9AD959F62C 101562~|~1~|~1~|~01/BRF/FCEO~|~"01/BRO/BR/FCEO" Fairfield County Engineer replacement of deficient structure on Liberty Township Road 251 utilizing CEAO LBR funds with a federal max (at 80%) of $1,094,320.~|~10 - Bridge Replacement~|~B5814989961C1EECD877A11E68AE5CAC284473C1 119367~|~1~|~1~|~01/STR~|~Reconstruction and roadway improvements~|~04 - Reconstruction - No Added Capacity~|~F9275CB4DE3893FB001D8D51B93CD1886E574D26 125416~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 147 9.11, CFN 1800760 and NOB 285 8.92, CFN 1838543.~|~04 - Reconstruction - No Added Capacity~|~4E322A5066D7144C28E6E759B6FB28B9C06F8BE6 120350~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~C665B1B187EBACA530D13F6635E9A21F88C833C3 88393~|~1~|~1~|~01/BRO~|~Replacement of the bridge super structure with minimal approach work on MOT 202 0128 SFN #5700728~|~10 - Bridge Replacement~|~75F56103058E9805B86A30FECC221EE22FB1421A 122465~|~1~|~1~|~01/NFA~|~Davids Drive Ph 3 (4R47, OPWC, Local Match)~|~04 - Reconstruction - No Added Capacity~|~418D8E7F152B16B11A348A553FF413B6F304EF62 115135~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~98958592958639001AAC52F8F038E13F86A9A40F 98516~|~1~|~1~|~01/BRO~|~Work to repair the structure. District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~3AD03A2BE459FCCA60ABA16ABE0CCBC6C54C25C9 98516~|~1~|~2~|~02/STR~|~Slide repair work funded by the Geologic Site Management (GSM) program. Funds needed over the GSM cap will be from the District Preservation Program budget. Along the ditch to the north east of the structure. From approximately 1.70 to 1.76 on SR 108 in Putnam County.~|~04 - Reconstruction - No Added Capacity~|~E4F916AF417C23724FE9FA303B5AF25296EA5352 115048~|~1~|~1~|~01/STR~|~Split for STP rural culvert work~|~04 - Reconstruction - No Added Capacity~|~0A55E82D7503AF43A0DB938DB178666405DBA6FF 96551~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~5284833C3AA8D563527C5310A3B449A3CCE8795F 96551~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F75FFEB2FE27F7D56DE6A9D90BED7A5E19569246 96551~|~1~|~4~|~04/STR/ANDO~|~Installing/upgrading of ADA Curb ramps along SR 85 in the Village of Andover.~|~04 - Reconstruction - No Added Capacity~|~B9E2CFEA2200BCF58C0A82E87A4FCD4EE961C671 96551~|~1~|~3~|~03/STR~|~Replacing structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~C26FE3F872D0E597B40B7F10101B226526FEE925 97319~|~1~|~2~|~02/NHS~|~SCI US52 15.81 to 16.75~|~05 - 4R Maintenance - Resurfacing~|~D57C14A488AE6A8182CB58F6EDFE1244313A3A17 97319~|~1~|~3~|~03/NHS~|~SCI US 52 16.10 (SFN 7300905)~|~47 - Bridge Preventive Maintenance~|~0AF4B2CC4CD1D43D179AB72D2806113BD007D674 97319~|~1~|~1~|~01/NHS~|~SCI US 52 19.07 to 21.84~|~05 - 4R Maintenance - Resurfacing~|~B3F61500289FF730518EF9A297767F2D01E6076E 97319~|~1~|~4~|~04/NHS~|~This plan split is to cover curb ramps and signage at 100% local.~|~05 - 4R Maintenance - Resurfacing~|~41B6D98599BB961CA85DF40A77B266E60B0AE684 110109~|~1~|~2~|~02/S<2~|~Urban Paving Plan Split - City of Delaware~|~05 - 4R Maintenance - Resurfacing~|~C4475149E4D203E5E36478245B00E428EE592DE0 110109~|~1~|~1~|~01/S>2~|~General System/Urban Area Plan Split for resurfacing, pavement repairs, striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~4A9EDCE650036C44BBD51E6C2F6D8254FD11F2F6 90219~|~1~|~1~|~01/MPO~|~80% Federal MPO STP / 20% Local funding split for the resurfacing of Rockside Road.~|~05 - 4R Maintenance - Resurfacing~|~4A23F8B0D1D631DC2DAEFDD0EE8C8FB7AE895CFB 90219~|~1~|~2~|~02/MPO~|~100% local partiicipation~|~05 - 4R Maintenance - Resurfacing~|~CF81E00E999ED0EA42E18DA28F338C96D66AB492 103085~|~1~|~1~|~01/MPO~|~Resurfacing of Medina-Line Road (CR 2).~|~05 - 4R Maintenance - Resurfacing~|~BD6DD2C29A6CB37F6D07ACBA3EBAC54E522218F2 112676~|~1~|~1~|~01/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 5~|~21 - Safety~|~3FCD43981E25C72B015FAFC333D382B91EEAB751 112676~|~1~|~2~|~02/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 6~|~21 - Safety~|~DB7E54F6D38A81296755A14EB315E84922A0D345 112676~|~1~|~3~|~03/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 9~|~21 - Safety~|~A1154C350AC965E4BE7981E88A2BBEBD198EE12B 112676~|~1~|~4~|~04/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 10~|~21 - Safety~|~67CFEAC1F7E1D3FD2D0E5C1D85319E81C364DCF2 112676~|~1~|~5~|~05/ERD~|~Federal Stimulus Funding CRRSAA for Highway Lighting - C157 (100% Federal) - No CAP - replacement of lighting fixtures to retrofit for LED within District 11~|~21 - Safety~|~2157FC4BFA2FF419D69655517DA152E7CEAF8F86 112676~|~1~|~6~|~06/ERD~|~District 5 cable replacement - No Cap - 100% State (4PS7/005)~|~21 - Safety~|~B3351D633984AC0D64FC7EACC065663BF9DEF905 112676~|~1~|~7~|~07/ERD~|~District 6 cable replacement - No Cap - 100% State Funds (4PS7/006)~|~21 - Safety~|~CF5A7B5C398AE7405F7D18D1591F6889170B34C2 112676~|~1~|~8~|~08/ERD~|~District 9 cable replacement - No Cap - 100% State (4PS7/009)~|~21 - Safety~|~C2B29E3D60632B6C760FD9CC0961B421C901429D 112676~|~1~|~10~|~10/ERD~|~District 11 cable replacement - No Cap - 100% State funded (4PS7/0011)~|~21 - Safety~|~8BB6EB16601494A4E7D5146F064B2CD656E7CA02 112676~|~1~|~9~|~09/ERD~|~District 10 cable replacement - No Cap - 100% State funded (4PS7/0010)~|~21 - Safety~|~B4F3025E630B74E4E6EC3D56894E71BD0D7E9291 108795~|~1~|~1~|~01/NHS~|~Safety related resurfacing. JAC 35 1.79-2.43 ROS 35 26.90-27.80~|~21 - Safety~|~D433FC0A9C5F872AF104BAC2542F32B345B3409A 102494~|~1~|~1~|~01/NFP~|~Plan split for Crack-Sealing in D05 - 100% State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7A2417EEDFF864C1DED5446A3DB82E5446AD9BF1 124103~|~1~|~1~|~01/NFP~|~District-wide construction engineering services.~|~17 - Construction Engineering~|~7FA141FD51629F4BD8D6F4FDCF556B6CD62F6B19 116857~|~1~|~1~|~01/STR~|~Lighting project on MRG 266 4.13 and WAS 339 20.12.~|~21 - Safety~|~DF9FA18FEA16148E4D0ABBAD1B38E2136467F067 117720~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE 260 2.11, SFN 5602378.~|~~|~4E22BC203FAA4C4AD2E650A6C86B1ED130C50384 101410~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 Items on the NHS portion of SR 235 between SLM 7.54-7.58.~|~05 - 4R Maintenance - Resurfacing~|~EEA63132A8971E4FB792EFCB47FBF46D40963F11 101410~|~1~|~2~|~02/NHS/FAIR~|~Plan Split for the 100% City Items on the NHS portion of SR 235 between SLM 7.54-7.58.~|~05 - 4R Maintenance - Resurfacing~|~30E38495F299D3137DD04E168AF363E7DB48F352 101410~|~1~|~3~|~03/S>2~|~Plan Split for the 80/20 Items on the portion of SR 235 between SLM 7.58-8.30~|~05 - 4R Maintenance - Resurfacing~|~C9414D3C87EABFB3A6DB8D0800ED4E754D94D4D8 101410~|~1~|~4~|~04/S>2/FAIR~|~Plan Split for the 100% City Items on the portion of SR 235 between SLM 7.58-8.30.~|~05 - 4R Maintenance - Resurfacing~|~7D508BB94009AB1199E4E273EC9F638189C3075E 81911~|~1~|~1~|~01/S>2~|~80/20 funding split in state STP for the resurfacing sections within the City of Independence.~|~05 - 4R Maintenance - Resurfacing~|~3030BA6AB79653333A2C5082C34ED7EFAAD5C54E 81911~|~1~|~2~|~02/S>2~|~100% state STP for the resurfacing section within villages of Brooklyn Hts, Cuyahoga Hts, and Valley View.~|~05 - 4R Maintenance - Resurfacing~|~3B66669EFF6D6D71CC4E3C470CF2A982F09754F9 81911~|~4~|~4~|~04/S>2~|~100% local funding~|~05 - 4R Maintenance - Resurfacing~|~9564E0DD1693131B1B8D1EDC1351449EE959F298 81911~|~1~|~3~|~03/S>2~|~100% local funding for ADA compliant curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~B76E4B2F8E5F40816A09FA1D6A7A84D8E056FD61 91603~|~1~|~1~|~01/BRO~|~Replace existing boxbeam structures for bridge (HAS-799-0391, SFN 3403173 and HAS-799-0453, SFN 3403203) with new single span prestressed concrete composite bridges.~|~10 - Bridge Replacement~|~413BAB6B1366CE0867F5F1065185BDEBCCDF5115 102846~|~1~|~1~|~01/SAF~|~D09 PM FY2022 (B)~|~21 - Safety~|~CC8E5A3FDD0DAB50399B4F385101A3DE84143181 108440~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MOE 26 9.56. DSR MOE-022. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F580E5773D1E586B6AE9A2521ED56A02E128BDCF 112452~|~1~|~1~|~01/SAF~|~Intersection improvement project. Replacing overhead flashers with LED enhanced signs on all for approaches. VIN 56 3.02-3.40 and VIN 93 17.33-17.71. Funded 90 Federal/10 State.~|~21 - Safety~|~37463E88E1661DEF785B76A670CE9627762E9121 90954~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% federal funds.~|~~|~77CFDF04B672FFAACA1D10A81A601D3BC1E0DFE0 101057~|~1~|~1~|~01/NHS~|~This plan split is for the NHS route.~|~05 - 4R Maintenance - Resurfacing~|~930AFD8614A64561308C5D0890DBDB3D9CA0C85A 93648~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~640540AB19418193FF11774FC739EC9DA987C361 123642~|~1~|~2~|~02/NFP~|~Plan split for maintenance items by work order at unknown locations utilizing maintenance funding~|~21 - Safety~|~5494BA876B32C903CD1FD9ABD4A2AA73F8597797 123642~|~1~|~1~|~01/NFP~|~Plan split for lighting upgrades on the interstate at known locations~|~21 - Safety~|~C15A86B2FBC6F8AD25598E8E951CBE97D4290719 97557~|~1~|~1~|~01/STR~|~Ohio Brdg Part.~|~17 - Construction Engineering~|~4D651FD02009305BB9C068298BD480CBA5B8F2CE 115437~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~67149A274FC63BF25E2968700C66B8050558C324 96948~|~1~|~1~|~01/NHS~|~It is proposed to line an exisiting pipe arch structure on US 35, 4.33 miles east of the Ross County line.~|~04 - Reconstruction - No Added Capacity~|~EF5B4FAEF62D980FBC96A1B63E1D41CD990A5F15 121141~|~1~|~1~|~01/IMS~|~Resurfacing IR 470~|~05 - 4R Maintenance - Resurfacing~|~C7F58E39F58815F410C590B0E02DCDCB8D4E455E 100678~|~1~|~1~|~01/NHS~|~Microsurfacing of TUS-250 from SLM 0.00 to SLM 3.66 and TUS-21 from SLM 0.00 to TUS-250.~|~05 - 4R Maintenance - Resurfacing~|~AF91AB6FB4E8895D6055162A8E1CACC7155C325E 100678~|~1~|~2~|~02/STR~|~Microsurfacing of SR-93 from US 250 to the Stark Co. Line and SR-212 from Stark Co. Line to Stark Co. Line.~|~05 - 4R Maintenance - Resurfacing~|~1636DD4C658C5E0F0E8FEE8169E49429A12181A5 98148~|~1~|~1~|~01/IMS~|~Interstate 90/10 Non-BR FRA-670-6.05 over CSX RR~|~13 - Bridge Rehabilitation~|~6A649927AF53B85F77542048F08F268B7563C89B 109719~|~1~|~1~|~01/STR~|~AC overlay with repairs on:LOG-508 SLM 0.00 to 1.29~|~05 - 4R Maintenance - Resurfacing~|~7C1283A9EAC15E0E90CE109A629A5B1E49C8E1C3 91726~|~1~|~1~|~01/IMS~|~Rehabilitate bridge GRE-675-0845N (colonel Glenn Highway over Ramps to IR 675) by replacing the asphalt wearing surface with a rigid wearing surface, painting the structural steel, replacing the bearings, and perfroming other minor rehabilitation items.GRE 675 0846N; SFN 2903741 and intersects: Colonel Glenn Highway-Cr1~|~04 - Reconstruction - No Added Capacity~|~2DA8F9E5164DD7420099D882A9AF36878509D430 91726~|~1~|~2~|~02/IMS~|~Resurfacing and pavement repair on all of the ramps involved in this interchange. To/From I-675 and To/From Colonel Glen Highway.~|~~|~D97DB16A768F1A4DD31CB4BBCD7E96EB08F2B8CA 96197~|~1~|~1~|~01/STR~|~01/STR/OT ; Plan split for 80% federal and 20% state funded culvert work using the culvert SACs 4CW7 and 4CV7.~|~44 - Other~|~9A1CFDCE00260929B90E9413433CBA13C3BEB398 86956~|~1~|~1~|~01/S>2~|~Plan Split for TRU SR 304 0.00 to 1.02 (80%/20%) Items.~|~05 - 4R Maintenance - Resurfacing~|~22788C2D9CA6570303E737B3CBE02677AB5BD0EB 86956~|~1~|~2~|~02/S>2/GIRA~|~Plan Split for 100% city items.~|~05 - 4R Maintenance - Resurfacing~|~2D411717EB1E20C1EE3A4A37E0CD29CED75EAA82 106282~|~1~|~1~|~01/NFP~|~Pavement markings along various routes in Ashtabula, Mahoning and Trumbull Counties.~|~~|~6CD3337428440DA09B56EF0438286F2576356009 96672~|~1~|~2~|~02/NHS/TALL~|~100% Urban Paving Costs inside the City of Tallmadage~|~05 - 4R Maintenance - Resurfacing~|~07FC6D6F12A951C1D5B868039299FF430E5EF92C 96672~|~1~|~1~|~01/NHS~|~Resurfacing SUM-SR 261-13.72 to 14.92.~|~05 - 4R Maintenance - Resurfacing~|~D4C43D3BF7484E2A143A9E7E56E5F08135C5C61F 89046~|~1~|~1~|~01/NHS~|~Split for all work on the NHS portion of this project. This would be only for the work on SR-44. District, MPO and Safety funds are capped.~|~04 - Reconstruction - No Added Capacity~|~5292DB4734E55E95A781FFD50CD0C68CFB78881F 89046~|~1~|~2~|~02/S>2~|~Split for all non-NHS work on the project (Crile Rd, Auburn Rd, new connector road). Safety and MPO funds are capped. Local is responsible for any funds above the caps.~|~01 - New Construction~|~5A0F0EEB93AC4A38F1850F0A856C08F672467734 109844~|~1~|~1~|~01/STR~|~ROS 180 7.66-11.96ROS 327 2.08-7.99~|~05 - 4R Maintenance - Resurfacing~|~6D6D2DED91B819B1A6E7C1501740323CEBB2E11A 109844~|~1~|~2~|~02/STR~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~AE86DB5B3451235FBCFEEB222A994ECE8E7A3EA3 109844~|~1~|~3~|~03/NFP~|~Retro Fuel Price Adjustment~|~47 - Bridge Preventive Maintenance~|~BBA75E34FA4FFCE19D3909318C540988FB7775F2 104703~|~1~|~1~|~01/IMS~|~Construction Inspection for PID 82288~|~~|~90A4B99446EA0A0864AD7EC50F585E8BDB7EE479 104703~|~1~|~2~|~02/IMS~|~Construction Inspection for PID 104667~|~~|~FF9B1BD40F96149FBBCFF29DD8C4C01AA7CCA6D9 121555~|~1~|~1~|~01/STR~|~All work included in this split.~|~13 - Bridge Rehabilitation~|~9C3D7B838DC151AB3F0B0BC39B66BC59FE2355F4 101883~|~1~|~1~|~01/NHS~|~Bin wall reconstruction along State Route 14 near Lake Rockwell, in the City of Streetsboro, Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~4E07A06B774C4476B722CA6D0244E049DD14F37E 92114~|~1~|~1~|~01/IMS~|~resurface LUC IR 475 9.06-9.92 - Central Ave to I-475/US23 split~|~05 - 4R Maintenance - Resurfacing~|~7B4D264566E6A98A580F3528FE2926946493A33A 99848~|~1~|~1~|~01/MPO~|~Covers work related to wideing of Sawmill Rd, multi use path, and intersection upgrades to Bright/Sawbury and Hard.~|~03 - Reconstruction - Added Capacity~|~11F0F5E6D1A8D68067A34278CCB5F7AD61987B4A 91139~|~1~|~1~|~01/BRF~|~8738858 WOO CR28 0.02 Intersect: Rocky Ford Mermill Road~|~10 - Bridge Replacement~|~51816F55659E351A3A6E3533F6B07285B459BB01 101370~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 733 1.13, SFN 5340780. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~6908D17019493F3C537B355F4705D833936BEEDB 126722~|~1~|~1~|~01/S>2~|~Replace the bridge carrying Parsons Ave over Norfolk Southern Rail lines north of Groveport Rd.~|~10 - Bridge Replacement~|~D2D8EF9F4DA7807650FCEB6AD318809585DBC701 92954~|~1~|~1~|~01/NHS~|~$1,100,000 City of Medina / TRAC Funds~|~03 - Reconstruction - Added Capacity~|~898FC5BBCF8A34FE1CCF982EB37AFD38D9C9BE9B 92954~|~1~|~2~|~02/NHS/MED~|~100% Local Items - Water works~|~03 - Reconstruction - Added Capacity~|~A7D58A88838A16CC85CA4715EF69FEA99E835B5B 92954~|~3~|~3~|~03/NHS~|~Funding for Questions, VECP's, and MOT Plan Changes for Project to be utilized by consultant.~|~17 - Construction Engineering~|~43753E50DBA889E82692858F91A23DD0ECDA6D04 92954~|~1~|~4~|~04/NHS~|~Fund the remainder of the approved modification 17337-8 for the on-going services during construction.~|~17 - Construction Engineering~|~F2FD772245AFB4873DCDF6A6F29767B2596B81CC 102686~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 50 0.00-1.756 and VIN 50 22.81-30.167. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~883BD00EE226CDD8738D82C9A65BD161431219F6 102686~|~1~|~2~|~02/STR~|~Resurfacing with an asphalt overlay treatment on MOE 145 12.87-15.34. Funded 80 Federal/20 State Major Investments Funds. ~|~05 - 4R Maintenance - Resurfacing~|~679339489502B3171CCDDA77864039D16B4C0BD1 93920~|~1~|~1~|~01/CMQ~|~Project will interconnect six (6) existing signalized intersections (Broad Street with: Dayton, Main, Xenia, Hebble, Central, and Highview Streets) with fiber optic cable, replace outdated non-standard signal infrastructure, and construct missing sidewalk.~|~44 - Other~|~5E410B03DD547A99FF3BAA899ADE939F2BDB3DF4 99472~|~1~|~1~|~01/NHS~|~Geological Site Management Funding - 4SF7 (80%)/4SS7 (20%) - No CAP - Rock Scaling of the rock face on COS-US 36-24.16.~|~21 - Safety~|~DFDFA727A0B62D548AAA2C8EA7599478D4493E98 93263~|~1~|~1~|~01/BRO~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) and Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC) - Rehabilitation on 1602403 COS SR541 19.18 Intersect: Sr 541 Over Sr 16 & 83; BR Eligible for Rehabilitation: Length=146 SD/FO(2) SR=67.0 DSR=5~|~10 - Bridge Replacement~|~D702E6A32F7284A5FB020E0966A0F48AB5B84E2E 93263~|~1~|~3~|~03/NHS~|~District Preservation Paving on NHS - 4PF7(80% Federal) / 4PS7(20% State); Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC): Earmark OH403 funding 4R47 (100% Federal) - Resurfacing with related work on COS SR 16 08.99 to 09.84~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E6ABF11FCD81671A34E5FF2B81359951B53B2949 93263~|~1~|~2~|~02/S<2~|~District Preservation Bond 100% State; Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC); then 4PF7(80% Federal) / 4PS7(20% State) - Rehabilitation on 1601237 COS SR541 19.3 Intersect: Muskingum River; Not BR Eligible for Rehabilitation: Length=801 SD/FO(0) SR=85.2 DSR=5~|~13 - Bridge Rehabilitation~|~090AB19333E5FCBC3A141C8668AEDCDFFBB9DB4F 93263~|~1~|~4~|~04/S<2~|~District Preservation Paving - 4PF7(80% Federal) / 4PS7(20% State); Re-Purposed Earmark OH096 funding 4R27 (80% Federal) / STMA (20% State TRC) -Resurfacing with related work on COS SR 541 19.06 to 19.53~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~16CB98A70AC12EDEC307F402DEFDA88A9416729B 95746~|~1~|~1~|~01/NHS~|~HEN-6 from SLM 24.55 to SLM 27.99~|~~|~0E8B22DEDDEE65211C032B6FA7AC439AF4466635 122988~|~1~|~1~|~01/STR~|~bridge plan split.~|~10 - Bridge Replacement~|~EAD3B2346F858F0FE30E95DBDC04EC9114504E6F 91022~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on~|~05 - 4R Maintenance - Resurfacing~|~B0765BDBD42A340AD21562A30774F4E75620CFEB 117398~|~1~|~1~|~01/MPO/HUBB~|~Resurfacing Elmwood Dr from SR 304 to Jerry St (Base Bid), Additive Alternate for resurfacing Elmwood Dr from Jerry St to Hubbard North Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~8B29C498E0D089E184798E137F7305278333B345 110060~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MRW-71-12.19-19.53~|~05 - 4R Maintenance - Resurfacing~|~1FE2B3003760C983FE3ABDF4D003D226AEC52E03 110060~|~1~|~2~|~02/STR~|~MRW-61 Resurfacing Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0DD47E8AE3E6BD7351A6DE2A0293004C3081CD48 110060~|~1~|~4~|~04/IMS~|~Patching approach slabs and installing polymer modified expansion joints on three sets of twin bridges along MRW-71. MRW-71-1550L & R, MRW-71-1763L & R, MRW-71-1876, MRW-71-1877~|~13 - Bridge Rehabilitation~|~03264655CE97B840723C28745FBB94D1BDD401CC 110060~|~1~|~3~|~03/IMS~|~Culvert Plan Split: Lining culverts MRW-71-12.225 & MRW-71-12.916~|~04 - Reconstruction - No Added Capacity~|~6966A0A1FCCE2F0273D8E85D36C65324ABFAAA40 110060~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~29E0B8026084DBE72B41C2803CDC62F70390BBC9 100658~|~1~|~1~|~01/S>2~|~plan split for pavement work in the large urban sections~|~05 - 4R Maintenance - Resurfacing~|~2A7343451BBE1EC940E0F593B4261D0F5834D2CC 100658~|~1~|~2~|~02/STR~|~plan split for pavement work in the rural sections~|~05 - 4R Maintenance - Resurfacing~|~FDFB73C61AE85D5D1302E47EC4C341606EB4202F 109037~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 13.99-14.04. 100% State Emergency funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D0FE5282DB7E9A9A29A2CEA43F2B7D63F70053AB 109061~|~1~|~1~|~01/NHS~|~Slide repair on SCI 23 3.71~|~04 - Reconstruction - No Added Capacity~|~E963B3AA1ACB655614576B675E7CCF6F6611CB50 103098~|~1~|~1~|~01/IMS~|~Interstate Plan Split for the following Routes:FRA-70-0.00-3.41FRA-270-42.84-48.47FRA-70-5.24-5.26~|~05 - 4R Maintenance - Resurfacing~|~AFB64AA183621C920C217010330FAD36F91F127C 122472~|~1~|~1~|~01/S>2~|~Plan split for bridge work~|~66 - Resilience Improvement - Highway Project ~|~A07812831E11DF9C91ABAD135643C9BD021D2B8F 100373~|~1~|~1~|~01/STR~|~For work outside the Van Wert Urban Area. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. Rural STP. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~8A728636A16CE47886AE5FB4684A65EB74EB2581 100373~|~1~|~2~|~02/S<2~|~For work inside the Van Wert Urban Area but outside the City of Van Wert. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. Urban STP. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~84DD39B1A4C21544AAA68406E09E95A6A4D85A3D 124098~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 56 3.06 (SFN 8200726).~|~10 - Bridge Replacement~|~91BAB81215A094B3819654DE13085D7433521F17 101388~|~1~|~1~|~01/NFA~|~HIG CR 10 1.62 (SFN 3630668)~|~10 - Bridge Replacement~|~97517EE0231524B5F7EE18B4B32EFE2D3A5C838F 113792~|~1~|~2~|~02/S50~|~Lighting - 100% Local Funds~|~31 - Landscaping & Other Scenic Beautification~|~2EAC6AE421AAA966289486CF9170B8CDC6BF15E5 113792~|~1~|~1~|~01/S50~|~Improve safety of the corridor through access management by constructing raised medians from Leffel to Lansdowne and on east leg of Leffel for 150'. Modify signal and lane configuration at the Leffel intersection and construct loon for SB u-turns.~|~04 - Reconstruction - No Added Capacity~|~FD3FD96D45EFBCCA7B9C6ABAFC1CFEF6E32135DA 117069~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - No CAP - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of bridge wearing surface and deck patching.~|~13 - Bridge Rehabilitation~|~B85E1FDC5FA6DA85EA4978F7C070861C494CC71A 116566~|~1~|~1~|~01/S>2~|~plan split for bridge work~|~13 - Bridge Rehabilitation~|~1690C5300D90D06A31163950C8BCB582E530170B 100070~|~1~|~1~|~01/STR~|~LAW 217 9.80 Slide Repair~|~44 - Other~|~92CF78287726810D894B06C4A109DEE1C9DE7F97 92552~|~1~|~1~|~01/SAF~|~Improve Holden Gilmore intersection by adding turn lanes.~|~21 - Safety~|~7A7056047A93F140F3883E425F3BED7326A62696 102198~|~1~|~1~|~01/STR~|~ADA CR 100 1.61 ER Slide DSR# ADA-002~|~44 - Other~|~C7E97743CF23E4052AD5E6F315E139B5BD00713B 102198~|~1~|~3~|~03/STR~|~ADA CR 100 6.54 DSR# ADA-004~|~44 - Other~|~D9FCE18392921CF7D1169F2A831B94D67701CE7B 102198~|~1~|~2~|~02/STR~|~ADA CR 100 3.43 ER Slide repair DSR# ADA-003~|~44 - Other~|~679800A823ADB7FBAE64DE23403AD50E982CC923 126391~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~A73CBC4082AC5FC8FEC60AA0C6D6D23228B6965D 117392~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~DB92B58F8473FA9257960E6067F56755710EA94B 101149~|~1~|~1~|~01/NHS~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide.~|~21 - Safety~|~1208CC59B7455E6D348019A5310F2B6A99333CB6 107957~|~1~|~1~|~01/NHS~|~plan split for resurfacing (roadway) work on GRE-35~|~05 - 4R Maintenance - Resurfacing~|~9A187285B310E605A2F5A1615DA0A9AD048E45EF 87352~|~1~|~1~|~01/IMS~|~Priority System minor rehab. on BEL-70-12.61 to 15.72; includes asphalt resurfacing, pavement repairs, guardrail reconstruction, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~67E80DF1BBA3FF730D56DFECC2EB53A3907F6413 107545~|~1~|~1~|~01/S<2~|~Resurfacing COL-9, COL-14, COL-62 & COL-173~|~05 - 4R Maintenance - Resurfacing~|~613DA46FA1C6B9C75C0BFDF6CA178AD6338EBA1F 107545~|~1~|~3~|~03/S<2~|~Asphalt resurfacing within the City of Columbiana~|~05 - 4R Maintenance - Resurfacing~|~CC737CA593E953F01ECE303CAA700E8BB80CABC9 107545~|~1~|~2~|~02/STR~|~Resurfacing COL-45 and COL-14 from SLM 12.84 to SLM 19.26~|~05 - 4R Maintenance - Resurfacing~|~201756C0229F3E53D003FE18A5A5FCBD34EAE1C2 112738~|~1~|~1~|~01/NHS~|~Replace UNI-42-1.45~|~10 - Bridge Replacement~|~8F30E2CDA9176838ED704A884CB855521DE09CCA 113114~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work.~|~05 - 4R Maintenance - Resurfacing~|~B1C97E9C0C107335853203E08FD1ED137E6C12DF 101437~|~1~|~1~|~01/IMS~|~This split includes all of MRW IR 71 and most of DEL IR 71~|~05 - 4R Maintenance - Resurfacing~|~6CD8B26D449DBE9F1C5B8ABCEF8E8D21C1DF4277 125515~|~1~|~1~|~01/STR~|~bridge replacement.~|~10 - Bridge Replacement~|~18AB92C8287E7162D90DCB04539796AF3F02B195 112806~|~1~|~1~|~01/STR~|~Resurfacing, paving over one structure.~|~05 - 4R Maintenance - Resurfacing~|~D09622F6DBDAD4C9D7DEFDEB35619322F82A646D 111848~|~1~|~1~|~01/BRO~|~KYTC's portion of the project.~|~13 - Bridge Rehabilitation~|~48D1D548F7B7C62982692252A141F36C36EBAAE1 111848~|~1~|~2~|~02/BRO~|~OH's Share of the painting project.~|~13 - Bridge Rehabilitation~|~B099ED777491139418D0D196D745FCEA1365B869 114226~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes throughout ATB, MAH and TRU counties.~|~21 - Safety~|~642E77C098853FBF2E7ED78C79676C88CDE03F81 106267~|~1~|~1~|~01/S<2/Cir~|~Urban Paving - PIC-22-17.34 to 18.28, PIC-56-19.57 to 19.61, PIC-188-0.00 to 0.22~|~05 - 4R Maintenance - Resurfacing~|~AD89DF315C89A0A5185034282A16966B96F77D06 106267~|~1~|~2~|~02/S<2~|~Items to be paid 100% by the City of Circleville~|~05 - 4R Maintenance - Resurfacing~|~F09AD4A47A6F3ECD91B1A006C70C1BC69F6C6C19 13234~|~1~|~1~|~01/BRO~|~7302193 SCI SR73 1.23 Intersect: Rarden CreekProject Termini: On SR73, begin project .01 mile west of Rarden west corporation limits. Project Description: On SR73, it is proosed to replace the existing deficient structure, SFN 7302193, with a new structure and any necessary approach work. This bridge spans Rarden Creek.Eligible for BR funds. 80% Fed/20% State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~32D1AC1018247A84F5BAD0C85EB109CA804D692B 95564~|~1~|~1~|~01/NHS~|~Priority System Minor Rehab. of JEF-7; Asphalt resurfacing to address any structural deficiencies, pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~EBFBFA4414F8832DFCFF5DEE6C1037BB4A14C442 119597~|~1~|~1~|~01/BRO~|~Bridge Repairs due an accident.~|~13 - Bridge Rehabilitation~|~88CB4FF5065B7220C28683722FFE971EE06C2361 125320~|~1~|~1~|~01/IMS~|~Plan for roadway work to lower the existing pavement beneath the overhead RR bridge~|~04 - Reconstruction - No Added Capacity~|~93F1F398373A77E5345D6C122EEC1F3F4A3A9561 97133~|~1~|~1~|~01/NHS~|~construct left turn lane from US22 to Lakeshore~|~~|~B65581D9FAF9557AC4CEC2348EE08112770DB844 94279~|~1~|~1~|~01/BRF~|~Bridge on East Circle Lane over Ottawa River in Toledo, SFN 4861760~|~13 - Bridge Rehabilitation~|~9DFEE0FA03886B4D5CA36B9447B96B048FBB600A 113655~|~1~|~1~|~01/SAF~|~Safety improvements on Cemetery Rd at the IR 270 interchange~|~21 - Safety~|~8A044F9B9F9E2B30F655572876982D7967520545 113655~|~1~|~2~|~02/IMS~|~Minor repairs on Cemetery Rd structures over IR 270~|~47 - Bridge Preventive Maintenance~|~0ECE86177E5437E4DB50584546599E23DC08B7D7 113655~|~1~|~3~|~03/NFP~|~100% Local guardrail~|~47 - Bridge Preventive Maintenance~|~6DB07599EFD7954DED0A27DB6A97DFC53A27644A 120777~|~1~|~1~|~01/NHS~|~SDC Overlay & Expansion Joint Replacement~|~13 - Bridge Rehabilitation~|~08943D39887655E82FC21E2F169F79E8070D7FBF 112601~|~1~|~1~|~01/NFP~|~City of Piqua will construct an extension of Scarbrough Drive from the existing terminus to the west approximately 385 linear feet and match the existing road profile~|~44 - Other~|~BB39207C3BBD1B491FB599DC1C4BE57282A1EE5D 124315~|~1~|~1~|~01/ENH~|~Reconstruction of sidewalks, drainage, ADA facilities, and street lighting utilizing Federal TAP (80%) and Safety (20%) funds up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~87D8F99EC6ABF9BC6306C4520BB3D7ABD5FA5122 95445~|~1~|~3~|~03/NHS~|~Bridge maintenance work along SR 16~|~47 - Bridge Preventive Maintenance~|~76ACE2A3D669AEE3702A928CB65A50F0AC7FB8AB 95445~|~1~|~1~|~01/NHS~|~Addition of general use lanes along SR 37 and SR 16~|~03 - Reconstruction - Added Capacity~|~83BD6FA7AB9860FCA7368A709D5037B267A80B8B 95445~|~1~|~2~|~02/NHS~|~Replacement of existing pavement along SR 37 and SR 16~|~04 - Reconstruction - No Added Capacity~|~A59E84E027E9C6AE1E8F40D808F2A49F751027A3 95154~|~1~|~1~|~01/NHS~|~Structure damaged by a hit and run accident on December 4, 2012. Project is a heat straightening proejct.~|~13 - Bridge Rehabilitation~|~8937F4B50C8C9AA0FB19B42AB64F7E9902086CCB 121472~|~1~|~1~|~01/NHS~|~Joint repairs along HAM+CLE US 52~|~05 - 4R Maintenance - Resurfacing~|~336429C111FF89F03E5F9E5175245FB1D5B77230 19636~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation of 6003001 MUS IR70 12.58 Intersect: Hamline Avenue #; Not BR Eligible for Rehabilitation: Length=280 SD/FO(2) SR=93.7 DSR=8~|~~|~FCDF54D6992AE6845C90D785BE27A6157A492985 119485~|~1~|~1~|~01/NHS~|~Split for bridge work on the NHS~|~47 - Bridge Preventive Maintenance~|~14EBA3013B185F3724E563D5E72ACC7B1A13D425 119485~|~2~|~2~|~02/IMS~|~Plan split for performing steel repairs to an interstate mainline bridge for compliance with current load rating standards.~|~13 - Bridge Rehabilitation~|~47778FFAAD97DEB1DAF2C07182DA2347FFC8E5BC 102439~|~1~|~1~|~01/STR~|~Guardrail Replacement on various routes in District 11~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D343B3B349C720AE966D91C05F5FDEAD4F70F1FE 102439~|~1~|~2~|~02/NHS~|~Replacement of Type A Anchors and some guardrail along NHS and local NHS routes in District 11.~|~21 - Safety~|~BC3C7DD76314CF6107AB74D6484B44B33C67BB13 97452~|~1~|~1~|~01/NHS~|~Turn lane addition~|~21 - Safety~|~E1631950457837107A7EEEEB3B10111194C78EB3 96873~|~1~|~1~|~01/NFP~|~100% State Funds for district wide auxiliary pavement marking.~|~21 - Safety~|~0D47A52A427DF5E1677AB9BBE5A6F7EF297085F5 124771~|~1~|~1~|~01/BRF~|~Split for eligible expenses relating to rehabilitation of Darrtown Rd Bridge~|~13 - Bridge Rehabilitation~|~7BC7A8785EB4F2B8D06BCF860C734450DC5CE0FC 92857~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~31A20049E18E2E2A7704932B7CAF6CC282B55C82 103831~|~1~|~1~|~01/SAE~|~Signal retiming project within the City of Hillsboro.~|~21 - Safety~|~37C84921733C046AD05BE9F80F35C838032C1196 126376~|~1~|~1~|~01/IMS~|~Bridge rehabilitation including deck replacement, painting, semi-integral conversion, approach slab replacement, and pier patching. ~|~13 - Bridge Rehabilitation~|~A72BFCD821AE31EF0A0EA2D4CF18327D66C5CD24 109911~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded.~|~~|~20E52D02C3C92D8833BD9ED5E5A7F6D4D6CC247F 91562~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (COL-39-0020, SFN 1502433) with a four-sided precast concrete box.~|~10 - Bridge Replacement~|~DC47CB9A5A1CCAD733E43968F37A14ADA0FA5F7B 75643~|~1~|~1~|~01/IMS~|~Plan split for all bridge rehabilitation work associated with the Part 1 Tunnel lighting and joint repair project for structure HAM-71-0134 including design because Part 1 is a Design-Build project.~|~~|~A71A87F4A0FEC90B1D2C0BB66511C8894A796F24 102528~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of structure at LIC-661-13.94 (SFN 4506693).~|~10 - Bridge Replacement~|~42EE6A0E235F46E53C89E6373404E864C6A085E3 88218~|~1~|~1~|~01/NHS~|~Upgrade existing roadway lighting from Stroop to David, replace existing traffic signals at Far Hills/Shroyer and Far Hills/David and one commercial driveway modifications on Far Hills Avenue from the intersection with Stroop Road South to the intersection with Rahn Road.~|~21 - Safety~|~A950703CD7F27A517AE4D42BFA34209EA9962040 122827~|~1~|~1~|~01/NHS~|~Plan Split for MVPO funded scope.~|~04 - Reconstruction - No Added Capacity~|~353E8463F287049650DBAB635BE2AC52088AA5EE 122827~|~1~|~2~|~02/NHS~|~Plan Split for ODOT funded scope for work outside of Bryan corp limits.~|~04 - Reconstruction - No Added Capacity~|~66720BE180462152DFCA252D6CA8F7026665D38B 90811~|~1~|~1~|~01/IMS~|~Four-lane resurfacing project using an asphalt inlay treatment. NOB 77 1.54-6.42. Work includes the NOB 77/78 interchange ramps.~|~05 - 4R Maintenance - Resurfacing~|~A6782619C0826AAE8F2D8736224E511D9D9A2CE1 124680~|~1~|~1~|~01/STR~|~Replace culvert~|~04 - Reconstruction - No Added Capacity~|~0447145A56E1758ABCDEDB1ED40D55A6B20A5002 104273~|~1~|~1~|~01/MPO~|~plan split~|~28 - Facilities for Pedestrians & Bicycles~|~9C3E28DC24B9019FEF12DBDD69D03567101A1222 104273~|~1~|~2~|~02/NFP~|~100% City Items - Specific Bike Rack and Bike Station~|~28 - Facilities for Pedestrians & Bicycles~|~0486D864605A8B82AA6F03F36F3C65C2A469CE61 121372~|~1~|~1~|~01/SAF/PCEO~|~Perry County Engineer's FY2029 pavement marking project funded by CEAO - 4HB7 @ 100% capped at $50,000.00.~|~21 - Safety~|~2821E73AE548029FC01ED55C5BF15199B32157A2 95235~|~1~|~1~|~01/IMS~|~This Plan Split is for mowing interstates and interstate look-a-likes in the SouthWest region. This project is funded at 100% - therefore no plan splits needed for Urban vs Rural locations.~|~44 - Other~|~78FAC6D516FDC4EE5019BB4088A3A18FE96F064A 88795~|~1~|~1~|~01/STR~|~Replace deteriorating bridge with minimal approach work on SFN 0600962 AUG 66 1024 over the Saint Marys River.~|~13 - Bridge Rehabilitation~|~657E504B86295C64D5A9DD8268698B7099CE7A1D 85997~|~1~|~1~|~01/NHS~|~Whitehall urban paving on Hamilton Rd~|~05 - 4R Maintenance - Resurfacing~|~ED29CB51635E168CD9E91478D5B4D648B6F7A13A 85997~|~1~|~2~|~02/NHS/WHIT~|~100% Whitehall funding for pvmt repair~|~05 - 4R Maintenance - Resurfacing~|~1CD302C22EE27759683F748D62BDE2199E39EE56 124336~|~1~|~1~|~01/NFP~|~LPA Construction Inspection Task Order.~|~17 - Construction Engineering~|~99EC87ABBA5472C65562D824C67820CAB5968AF9 115472~|~1~|~1~|~01/NFA~|~ODNR Chip Seal project within Great Seal State Park.~|~05 - 4R Maintenance - Resurfacing~|~A8A2409DE54D0D9375DB35EF18090D5CBF871C72 124600~|~1~|~1~|~01/SAE/ASD~|~Install new guardrails and upgrade current guardrails on various County Roads.~|~21 - Safety~|~E8D074D8B7E3A773B950571480DA83C96FAA4C1E 126300~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~51DAEFEBD327AEC2F92E0EED80B5DAE87659C70B 101558~|~1~|~1~|~01/SAF~|~The project is to construct bumpouts at three corners at Third Street and Perry Street and four corners at Third Street and St. Clair Street in the City of Dayton.~|~21 - Safety~|~FCEB0D51DD9E49096FEEA00DB596F9B5675B7EE3 84455~|~1~|~1~|~01/BRO~|~Project Description: It is proposed to replace the deck on SFN 4400062,5.5, over Indian Guyan Creek.Project Termini: 0.40 mile north of CR1005, Old SR243. BR eligible. 80% Fed20% state 01/BRO/BR/State~|~08 - Bridge - New Construction~|~7641406B0E47A500B67719136CF224A4C1E73929 97947~|~1~|~1~|~01/STR/MCEO~|~"01/STR/OT/MCEO" Muskingum County pavement marking project funded by the CEAO at a project cap of $150,000~|~21 - Safety~|~70BA1A3F61247F5ACF9319FC09425EA0D975FA87 87146~|~1~|~1~|~01/STR~|~District 8 bridge painting project for FY2016 on bridge PRE SR725 0800. SFN: 6804209 and intersects: Paint Creek~|~47 - Bridge Preventive Maintenance~|~7868355ECF88D702C1EB729AFDC11CFC32BD4CE0 103166~|~1~|~1~|~01/IMS~|~Split for funding on the interstate~|~99 - State Preventative Maintenance~|~EF5B58CDA53C97A98D0389CFA887681181C703AA 103166~|~1~|~4~|~04/S>2~|~Split for funding on urban routes~|~99 - State Preventative Maintenance~|~33F7B991731BD7394BA9E37E7D2B86C15AAABB2C 103166~|~1~|~3~|~03/STR~|~Split for funding on rural routes.~|~99 - State Preventative Maintenance~|~39642EF51E797852BEAE13231757D78F7476E228 103166~|~1~|~2~|~02/NHS~|~Split for funding on NHS routes.~|~99 - State Preventative Maintenance~|~E5E6892A6B0AF1A1BD142320C6AC3ACE873968AD 122359~|~1~|~1~|~01/STR~|~Bridge replacement at MEG SR 681-14.40 (SFN 5303486)~|~04 - Reconstruction - No Added Capacity~|~67827C5183F9389BC884582E0E07CA2C986C5005 100176~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 146 17.50. Rural other federal aid funded 80 federal/20 state.~|~~|~99798D10DF92488C555F9BB0720C865688FCDC85 99816~|~1~|~1~|~01/ENH~|~Installation of a shared use path in the grass median on Murray Avenue from Settle Street to Plainville Road. Install a Rectangular Rapid Flashing Beacon (RRFB) at Murray Avenue and Plainville Road.~|~~|~A317A368D90562ACD4BF85D5497F6EC8451931FC 117528~|~1~|~1~|~01/NHS~|~Bridge liner.~|~04 - Reconstruction - No Added Capacity~|~1BAEB6F363CE40C9FBA431B989CEA886ACF5C161 101907~|~1~|~1~|~01/NFA~|~Resurfacing of Bryant Road in Windham Township.~|~05 - 4R Maintenance - Resurfacing~|~73CC84F759F486158D5AD9164E9619328AA95240 99016~|~1~|~1~|~01/SAF~|~District wide fast dry pavement marking.~|~21 - Safety~|~8060561E20AD21FB7A3F7C6384F22428170F3950 125692~|~1~|~1~|~01/NFP~|~Plan split for bridge operations costs~|~40 - Special Bridge~|~F7FEEF8C4D6F86E31689BE90B33D46B48E55B1DE 100470~|~1~|~1~|~01/NHS~|~Bridges.~|~13 - Bridge Rehabilitation~|~B393808BCEB44267C14755A219E828C51C0A18FE 94364~|~1~|~1~|~01/STR~|~On US52, 4.01 miles east of SR221 junction, it is proposed to rebuild & stabilize the slope to stop the horizontal and vertical movement. 80/20 split 01/STR/OT/State~|~99 - State Preventative Maintenance~|~B2387D6FB7EE0313EF0860358D8D3FCDD5842F0F 122911~|~1~|~1~|~01/NHS~|~Plan split for culvert work on FUL-20-15.077~|~04 - Reconstruction - No Added Capacity~|~265894773B93C0468AC539F2A513D141346AAFEC 98202~|~1~|~2~|~02/NFA~|~District Preservation Bridge Funding 4PS7(100% State) - No CAP - 1) Cos-SR 715-03.20;~|~13 - Bridge Rehabilitation~|~F937CCBCA3F1E5A5D9818DF799A9B466FAFEE12B 98202~|~1~|~3~|~03/STR~|~District Preservation Bridge Funding 4PF7(80% Federal) /4PS7(20% State) - No CAP - 1) Cos-SR 93-19.42~|~13 - Bridge Rehabilitation~|~C7FF78347A1ADB865FF6EE67EC4B7E6AFBFE8598 98202~|~1~|~1~|~01/STR~|~District Preservation Culvert Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - 1) Cos-541-09.86 2)Cos-SR 541-10.45; 3) Cos-SR 541-11.12; 4) Cos-SR 541-11.73; 5) Cos-SR 541-11.98;~|~44 - Other~|~641C6B6B92829D188E20F6B9FB5800DEDCA4CF0E 103260~|~1~|~1~|~01/SAF~|~District wide fast drying pavement markers.~|~21 - Safety~|~97C77958F9D669431E35BDCA956DFAEFE5537405 84653~|~1~|~2~|~02/NHS~|~Minor bridge work >20' span.~|~47 - Bridge Preventive Maintenance~|~AD8CFF514D993DE6BC532FF023026209952AD5E3 84653~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~CC37D1E65864CE37BD883D52116CAACF0080A2C4 84653~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~34D188BEA2AB0CBF73A2F60FA1189237749D5D60 84653~|~1~|~4~|~04/NHS/MASS~|~Median wall, median wall inlet repairs and Wavetronix signal upgrades paid by the City of Massillon.~|~04 - Reconstruction - No Added Capacity~|~1A3BC01D353B8ECF6A9EB7FDBF6EB81A711640CC 121991~|~1~|~1~|~01/NFA/KCEO~|~Knox County CEAO Federal/State Exchange Program Funding - 4C87 (80% State with 15% Bridge Credit) / LNTP (5% Local Match) - Replacement of SFN 4237617 carrying over Mile Creek~|~10 - Bridge Replacement~|~B91A7F116605F67A2C0D786B6D05E6C7E2D43184 108490~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 7.63. DSR WAS-015. Rural other federal aid funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~89CBEF78C77FA6B5B60A612709EA6D0DA5DF29C3 126676~|~1~|~1~|~01/NHS~|~FAY 35 1666~|~13 - Bridge Rehabilitation~|~582607BC4D8242C1E959F251BEF671FF5E686771 126676~|~1~|~2~|~02/NHS~|~FAY 35 1680~|~10 - Bridge Replacement~|~A04F91C05E3943CF603E3AA96DA00E17B113B47D 110470~|~1~|~1~|~01/IMS~|~Maintain structure by milling existing asphalt wearing surface, placing new asphalt wearing surface and clean and paint structural steel.~|~47 - Bridge Preventive Maintenance~|~4857B478C109B73BE622BF03E426BA1A0BF76179 117165~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~1416E6A2B5850A9B1B819965555626405EC6E30C 101881~|~1~|~1~|~01/SAF~|~Pavement Marking~|~21 - Safety~|~3285380D796F3B71192A25B2AB426E40AC591F53 113254~|~1~|~1~|~01/S<2~|~RIC SR 0061 12.75 Culvert Replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F15DA029FC23BC032EAEF7298CB67B70F72175AC 113254~|~1~|~2~|~02/STR~|~RIC SR 0598 00.72 Culvert Replacement or Liner.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DBB05B0F247483C4E8754630751AED4FD3DDB293 100633~|~1~|~1~|~01/S<2~|~Resurfacing COL-14 from the MAH Co. Line (SLM 4.34) to Columbiana (SLM 8.72). Resurfacing COL-14 from SLM 12.67 to 12.83.~|~05 - 4R Maintenance - Resurfacing~|~3166D29790BF1E3A3DA9EDB24D8A186E008468A9 100633~|~1~|~2~|~02/STR~|~Resurfacing of COL-14 from SLM 12.83 to the PA State Line.~|~05 - 4R Maintenance - Resurfacing~|~DBA4FFA1A3E5B32126D6B5A7DB306762E8B0C873 125273~|~1~|~1~|~01/BRO/TRCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~DF70CB872E850EF44C4951CC2105AA86ED2405B3 103412~|~1~|~1~|~01/BRF~|~Replacement of three bridges that have a length over 20 feet and are not on streets on the federal aid system. Federal funds from the Municipal Bridge Program with the match provided by the City of Delphos. After the cap is reached the funding with be provided 100% by the City of Delphos. The percentage of federal funds will be 95% until the cap is reached through the use of Toll Revenue Credit (TRC).~|~10 - Bridge Replacement~|~A8DCB13AF03F8EBE888522B61D6C6B4F1F0CB6F6 104646~|~1~|~1~|~01/MPO~|~Resurfacing Himrod Ave and Indianola Ave in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~59666975188647BB33F969E4FF58D6DCEBAB676E 90264~|~1~|~2~|~02/NHS~|~Railroad grade separation structure and retaining walls~|~08 - Bridge - New Construction~|~C1733C58CAFC0C661310DD9176F59C73C5F9449E 90264~|~1~|~3~|~03/NFA~|~Service Road A~|~01 - New Construction~|~07ACD9C82DB200DF824321D7448E7C3F07E15BF6 90264~|~1~|~1~|~01/NHS~|~MAR SR 309 pavement realignment to match new railroad overpass and work on Pole Lane Road at the intersection, including signal reconstruction.~|~04 - Reconstruction - No Added Capacity~|~1D162547B2C1B4338F23C93F7E91B17F0D10C680 80500~|~1~|~2~|~02/S<2~|~District Preservation Program funds. No local funds. Work inside the Delphos Urban Area but outside the City of Delphos. SR 697 from the Delphos Urban Area Boundary at 5.54 to the end of the project.~|~05 - 4R Maintenance - Resurfacing~|~1630EEF4F31C2016DE321C4EAC7133E0EA6DB9D9 80500~|~1~|~1~|~01/STR~|~District Preservation Program funds. No local funds. Work outside the Delphos Urban Area. All of SR 189. SR 697 from 0.00 to Delphos Urban Area Boundary at 5.54.~|~05 - 4R Maintenance - Resurfacing~|~A2C13D942CB5F2C6449261E8FF8E63457C4E0577 102792~|~1~|~1~|~01/NHS~|~This plan split is for work on NHS bridges.~|~~|~6FEE731A27E91494FCE785606252BAA6ABEEC500 93568~|~1~|~3~|~03/S<2~|~Pier encasement and abutment repairs on SFN 4604237 LOG 720 0425.~|~13 - Bridge Rehabilitation~|~13DC57024D3EDEF0C3A5A1A5125E04CEB0FD87A1 93568~|~1~|~2~|~02/STR~|~Pier encasement and abutment repairs on SFN 4602617 LOG 274 0616; SFN 5404029 MER 707 0606; SFN 0600121 AUG 29 0767; SFN 0602671 AUG 197 0258; and SFN 5402913 MER 197 0659, SFN 4603605 LOG 508-1.96, SFN 1901728 DAR 118 1303 AND Deck edge repair on SFN 1900668 DAR 47 1206.~|~13 - Bridge Rehabilitation~|~63F01B0F91400C6F48B7965433AA67E640C16B59 93568~|~1~|~1~|~01/NHS~|~Pier encasement and abutment repairs on SFN 4600398 LOG 33 1192 L/R, SFN 4600428 LOG 33 1192R, SFN 4600452 LOG 33 12.26 L, SFN 4600487 LOG 33 12.26 R and SFN 1900900 DAR 49 0728~|~13 - Bridge Rehabilitation~|~F17196C9DDF7D504E3F9F924A96D27696E277674 86838~|~1~|~3~|~03/S<2~|~100% City of Shelby~|~~|~F5CF6F478460F1D980B570E10A143E61FCEAE965 86838~|~1~|~1~|~01/S<2~|~District Allocation - Urbanized Area outside of Corp Limits (SR 39 SLM 5.45-5.86 RT and 5.78-5.86 LT).~|~~|~DA8A4E276B6FDB5CCCCB9435C83DF4AD61A34298 86838~|~1~|~2~|~02/S<2~|~Urban pavement (80/20) - District Allocation/City of Shelby Urbanized Area inside Corp Limits (SR 39 SLM 3.68-3.95, 4.62-5.45 RT, 4.62-5.78 LT).~|~~|~73D1AC1468325369A0FE0CF4AB3A75F047FFB699 86838~|~1~|~4~|~04/S<2~|~SFN 7002017 RIC-39-3.68~|~~|~A9BF742894A12A3A6AB5DD63E33ACA64F4551C8D 105751~|~1~|~1~|~01/S>2~|~Multiuse concrete path in the City of Kettering.~|~28 - Facilities for Pedestrians & Bicycles~|~AFD173F7BE13C94173C8EAAEC6DC70D89D79492E 116757~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~3A2CCAB2664B75D924B63E88A11E1152F2F2398F 116757~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~95A6FC7ACA95D9F3172D6D47502A9ED459A9AA53 121274~|~1~|~1~|~01/STR~|~All Work is within this split~|~13 - Bridge Rehabilitation~|~3A907FF10ED2B999741C0D8B32B2BBE01EFC75E0 108417~|~1~|~1~|~01/STR~|~Culvert rehab~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EA2E9BB900941944E870C74A6381916A3CE530AE 93951~|~1~|~1~|~01/BRF~|~Replace SFN 5531969 MIA CR0003 0239 with a new approximately 260 Ft. Long, 44 feet fact to face of parapet (47 ft. overall deck width), three span prestressed concrete box or I beam structure.~|~10 - Bridge Replacement~|~337740056D78EA51C620476EC0FA5B5C3F82BB75 117704~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 416 over unnamed tributary of Tuscarawas River.~|~04 - Reconstruction - No Added Capacity~|~7C50BD9F984FA85D36EA6412F0EB98BC13C6EC48 103679~|~1~|~1~|~01/STR~|~Landslide repair on ATH CR 20 2.62-2.69. ER funds 80% Federal and 20% Local. ATH-005.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB7A27C2FC470FD39B873FE661F920B974DEE0D3 110430~|~1~|~1~|~01/SAE~|~All the work to construct the roundabout is in this split. Construction Contract subphase funding is 100% federal funds from the safety program SAC 4HJ7. Roundabouts are eligible for 100% federal funds.~|~21 - Safety~|~A2D0390CA9AD93E4AB1E24FF3C523A1CC4D2D44C 110430~|~2~|~2~|~02/STR~|~Bridge Deck Replacement work designed with PID 102671 and will be sold as part 2. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7.~|~10 - Bridge Replacement~|~3FA8FC1F79EAAB81A42A9D4329E0DDCFF34F6E96 116065~|~1~|~1~|~01/NFA~|~Bridge replacement ~|~10 - Bridge Replacement~|~57C2BAD469B6DB5044C1A92E02ED101F490F8C4C 119874~|~1~|~1~|~01/BRF~|~Plan split for bridge replacement work.~|~10 - Bridge Replacement~|~8F6C25F5866E30537A657B0564C7D0C426F83651 103342~|~1~|~1~|~01/S<2~|~Resurfacing of Bigger Road - Kettering~|~05 - 4R Maintenance - Resurfacing~|~47EE0593AB3F8811C99611B179022C4F92052F54 103342~|~1~|~2~|~02/S<2~|~Concrete removal items, drive approaches, curb and gutter, median and catch basin work.~|~05 - 4R Maintenance - Resurfacing~|~A5DC798495819967F78A57CC08FDE037FF71C864 101448~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr WAY US 30 00.00 - 01.04.~|~05 - 4R Maintenance - Resurfacing~|~3CE78175448492708FE5D7A081D998CF0356E79E 101448~|~1~|~2~|~02/NHS~|~Bridge Work to be determined at a latter date.~|~13 - Bridge Rehabilitation~|~746B4BE35ED0C0F132083FD64ED8F21B6360EB0E 99983~|~1~|~1~|~01/S<2~|~USR 36 from Davis Parkway (SLM 8.25) to Sunset Drive/SR 185 (SLM 8.92) - pavement planing and resurfacing of USR 36 within the City of Piqua (1.75 inches)~|~05 - 4R Maintenance - Resurfacing~|~F0E7641DBDBCAF07A0FED0DD10A37CB15BA7BEFF 103253~|~1~|~1~|~01/NHS~|~Overlay on NHS routes.~|~05 - 4R Maintenance - Resurfacing~|~6C729AA2DC5577C08AF75B9180E17695B2F68B07 103253~|~1~|~2~|~02/S<2~|~Overlay on small urban routes.~|~05 - 4R Maintenance - Resurfacing~|~496E95BA5C365789880FDEF6320AD72F23672BA1 103253~|~1~|~3~|~03/STR~|~Overlay on rural routes.~|~05 - 4R Maintenance - Resurfacing~|~36689584FC540B0F6AA3486C8447D79DFDF49C57 88847~|~1~|~1~|~01/NFA~|~District Allocation - Bridge Replacement.Not on Federal Aid System so we must use state funds~|~10 - Bridge Replacement~|~13CBFB7E3D1D11F26E06974E76365CAB1B996983 125104~|~1~|~1~|~01/NHS~|~RCUT plan split.~|~21 - Safety~|~977743DC9C3D659D9E0925050F38DE5D616EAAF1 97591~|~1~|~1~|~01/STR~|~BRO US 52 10.17-10.20 Slide Repair~|~44 - Other~|~F4667AEA4B9B3EE6C8955CA63972EA6F13078539 107807~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 26 12.32-12.35. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1EEC0E7B56F8058BD307E0414F82A3B21E2A0D69 114534~|~1~|~1~|~01/NFP~|~D09 Bridge Maintenance FY27~|~47 - Bridge Preventive Maintenance~|~F271AACE022580C2E4618EDEB07B648AECE5885B 124642~|~1~|~1~|~01/IMS~|~Pavement replacement.~|~04 - Reconstruction - No Added Capacity~|~AE58CBCAD36569F1F4F4E66F7AB5FC67C48BC104 77260~|~2~|~5~|~05/BRO~|~90/10 IM Replacement two structures (no added capacity), TRU IR80 1.91 L/R. SFN# 7803397 and SFN# 7803427.~|~10 - Bridge Replacement~|~4252E34367F66973ECC395B13D110487E84C483B 77260~|~2~|~6~|~06/BRO~|~80/20 NHS Widening of two structures (added capacity). TRU-IR80-1.91 L/R. SFN# 7803397 and SFN# 7803427.~|~10 - Bridge Replacement~|~4349509071D6C0687274DA9ED1777F88CD52015B 77260~|~2~|~7~|~07/IMS~|~90/10 IM Pavement replacement from existing mainline from SLM 1.68 to SLM 2.18. Trumbull County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~4E8D5FD262E6CEB5C532015044A839897AA08166 77260~|~3~|~9~|~09/IMS~|~Full depth concrete repairs of MAH-IR80 from SLM 0.16 to SLM 4.50 in Mahoning County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~889653D79542542D2CC22FF6E3354B781F437944 77260~|~1~|~1~|~01/IMS~|~90/10 IM split covering the replacement of existing mainline pavement from West of SR-680 interchange to bridges over SR193 (Belmont Ave) except for new pavement replaced under Part 2 (SLM 1.68 to 2.18).~|~04 - Reconstruction - No Added Capacity~|~C89A4649B5AC3CFCB6549CBA570E2DF1BD13CDF7 77260~|~1~|~2~|~02/NHS~|~80/20 NHS split covering additional lanes from West of IR-680 interchange to the bridges over SR193 (Belmont Avenue), except for pavement included in Part 2 (SLM 1.68 to 2.18).~|~03 - Reconstruction - Added Capacity~|~DC8422E81F9CE080056F6AC164DF8573955DE5C7 77260~|~2~|~8~|~08/NHS~|~80/20 NHS split covering additional lanes from SLM 1.68 to SLM 2.18. Trumbull County, Ohio.~|~03 - Reconstruction - Added Capacity~|~E4137947729ACA1E86864E45081B6AFA9AC2C2AD 77260~|~1~|~4~|~04/IMS~|~Construction of five noise walls.~|~10 - Bridge Replacement~|~F561E15A24B35B02DF60B5B6F77DF2227E92EFEE 77260~|~1~|~3~|~03/IMS~|~90/10 IM split for the rehab of fourteen structures. 5002583 & 5002613, MAH-80-5.17 over MVSD. 5002648, MAH-80-565 under Four Mile Run. 7803303, TRU-80-0.96 under Salt Springs. 7803338 & 7803362 over Mahoning River and CSX. 7803516, TRU-80-2.47 under Pedestrian Walkway. 7803540, TRU-80-2.66 over Little Squaw Creek. 7803729 & 7803753, TRU-80-3.57 over SR711. 7803788, TRU-80-4.01 over Liberty Street. 7803605, TRU-711-1.03 over IR80 EB. 7803664, TRU-711-1.03 over IR80 EB. 7803699, TRU-711-1.16 over IR80 WB.~|~13 - Bridge Rehabilitation~|~FB49E8285BC36F258731AED2C8231415AF759507 100572~|~1~|~2~|~02/STR~|~LAW 775 (2.76-7.24)~|~05 - 4R Maintenance - Resurfacing~|~980DF93F39B7602B965053A3BC6C9C84F8E89B3D 100572~|~1~|~3~|~03/S<2~|~Bridge plan split placeholder.~|~47 - Bridge Preventive Maintenance~|~6363D6823D4017D9B61C50BFB7EF7D2B4C159E43 100572~|~1~|~1~|~01/S<2~|~LAW 775 (1.20-2.76)LAW 7 (3.41-6.36)~|~05 - 4R Maintenance - Resurfacing~|~58DFC83E7208E6E70A5BBB105DBCD69A1EA2B2ED 114784~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4.~|~21 - Safety~|~E9CF04F343975287152988EBB83B9FD27BB09813 114421~|~1~|~1~|~01/S<2/CAR~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~10731F99C03BE599628230E1A6B299B3CCBB36BE 108619~|~1~|~4~|~04/ENH~|~Formliner Logo and Test Panel using 100% local funds~|~31 - Landscaping & Other Scenic Beautification~|~46156ADF62AA11E37053862F63E64CCC647A8227 108619~|~1~|~1~|~01/SAF~|~Replace traffic signals at NB and SB ramp intersections~|~21 - Safety~|~E6816C280D5633580DCCE6574C4726ED96C0572B 108619~|~1~|~2~|~02/SAF~|~Install wrong-way detection system at ramps and overhead lane utilization signage on SR725~|~21 - Safety~|~C0F5F03E79AA095AD7FE48B4CA60D686AA7D183A 108619~|~1~|~3~|~03/MPO~|~Add Sidewalk on SR 725. Alternates for pedestrian lighting upgrade and tinted concrete formliner sealer.~|~28 - Facilities for Pedestrians & Bicycles~|~19B217701156B32ABC8E4618C747BC4B0452174F 83666~|~1~|~1~|~01/STR~|~Reconstruct Duvall Rd/TR-20 into SR-762 from US-23 to Ashville Pike/CR-28All items except Structure>20' (RR bridge) and Retaining Wall (necessary for RR bridge)~|~01 - New Construction~|~6C6913105902A9A406E3319D8D81E80FBF65A5D9 83666~|~1~|~2~|~02/STR~|~New Structure>20' & Retaining WallSFN 6504708, PIC-762-12.79, over NS & CSX RR's~|~08 - Bridge - New Construction~|~C4CD4566163CB27EF7A61743171248F617D8EC97 116470~|~1~|~1~|~01/MPO/STRE~|~Resurfacing, in the city of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~80D7C2BB3B860134E20C95D29789C1784A71C164 98870~|~1~|~1~|~01/MPO~|~Adding sidewalks to Wendy Place, Natale and Portal Drives near school.~|~21 - Safety~|~6C0EE593CDA1FE61B736030B0EE1A4524999CF22 125831~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~B32BEA61E639B4AEDA7BE8A039815A53EC6AC324 103302~|~1~|~1~|~01/NFP~|~Split for traffic signal work~|~44 - Other~|~411BDAD4097DDC4A8BAB23B93413631B87328A71 97719~|~1~|~1~|~01/MPO~|~local funds~|~05 - 4R Maintenance - Resurfacing~|~B4288828C4CB375A80022CAD75E7FC32BA23DA54 126390~|~1~|~1~|~01/S>2~|~Install sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~73F689584A9821235C9FA72B9C0D0836EEFEF2B3 102588~|~1~|~1~|~01/S<2~|~Work inside the Lima Urbanized Area but outside the City of Lima. On SR 117 from the beginning of the project at 19.96 to the Lima Urbanized Boundary at 21.32. State and federal funds from the District Preservation Program budget. No local funds.~|~17 - Construction Engineering~|~19F3E4D1E05BCEC238708103FFA22ECDB5BE126D 102588~|~1~|~3~|~03/NHS/LIMA~|~Work on SR 81 in Allen County on both sides of the road from Jackson Street at 17.01 to where SR 81 leaves the City of Lima on the left side of the road at 17.88 and on the right side of the road from 17.88 to where SR 81 leaves the City of Lima on the right side of the road at 18.17. The federal NHS funds are from the District Preservation Program budget. The 20% match will be provided by the City of Lima.~|~~|~21FB99EAC54541664A079AD22F033FC9459278C8 102588~|~1~|~2~|~02/STR~|~Work on the entire length of SR 103 in Allen County from 0.00 to 2.04; on SR 117 in Allen County from the Lima Urbanized Boundary at 21.32 to the end of the project at 28.61; on US 127 in Defiance County from the Paulding County Line at 0.00 to the Williams County Line at 12.16; on SR 2 in Defiance County from the Indian State Line at 0.00 to SR 49 at 2.34; on SR 18 in Defiance County from the Indiana State Line at 0.00 to Meuse Argonne St in the Village of Hicksville at 2.82; on SR18 in Defiance County from SR 2 at 3.52 to the ECL of Hicksville at 4.18; and on SR 49 in Defiance County from the SCL of Hicksville at 2.02 to SR 2 at 2.63; on SR 37 in Hancock County from the south to the north corporation limits of the Village of Mt. Blanchard; on SR 103 in Hancock County from the Allen County line at 0.00 to Pocono Drive at 0.91 and on SR 568 in Wyandot County from the Hancock County line at 0.00 to US 23 at 4.93. All funds from the District Preservation Program budget. No local funs.~|~05 - 4R Maintenance - Resurfacing~|~87A285F765D4AF0511CD36742CD1E3C20AA1D002 102588~|~1~|~4~|~04/NHS~|~Work on SR 81 on the left side of the road from where SR 81 leaves the City of Lima on the left side to then end of the work on SR 81 at 18.17 where SR 81 leaves the City of Lima on the right side of the road. All funds are from the District Preservation Program budget. No local funds.~|~~|~8AEEE99100E037D10E8BADC59B97AC973F8BC466 82787~|~1~|~1~|~01/SAF~|~Reconstruct the Old Mill Road / Stow Road intersecton 200 feet south and 500 feet west of the the bridge.~|~~|~C20EB86FE5147569CA918D7B2F259BEFE97BD84C 91702~|~1~|~1~|~01/NHS~|~Hydrodemolition of deck with mivro silica overlay. Minimum approach work excet approach slabs. SFN 1202820 CLA US 68 7.73 Ramp F over Conrail RR and SFN 1202677 Br. No. CLA-68-0738R Ramp C over the Mad River.~|~13 - Bridge Rehabilitation~|~1CFE77590E930301D4F26BF1C4BCB313B546DFA8 104700~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Deck overlay and abutment repair on SFN 6001777 MUS-60-14.01. Not BR Eligible: Length = 112; SD/FO (0); DSR = 7; SR = 74.0;~|~13 - Bridge Rehabilitation~|~F995C73B60A297C331A1DCB16F353530F950F218 102022~|~1~|~1~|~01/NFP~|~District 4 one year contract for mowing along interstate and interstate look-a-likes throughout ATB, MAH, POR and TRU Counties.~|~44 - Other~|~87F90C56F82883DD694FA9F7655745E694A22E16 87092~|~1~|~1~|~01/S>2~|~PLan Split for the Urban portion of the porject. This is includes CLE-131 between SLM 0.25-5.73~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~756685B26C8A224A3695483AD6DA02BFD4A58D31 87092~|~1~|~2~|~02/STR~|~Plan Split for the Urban portion of the porject. This is includes CLE-131 between SLM 5.73-8.51~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5C8DC75B7905261565EAFE822A53364638ACC239 111081~|~1~|~1~|~01/STR~|~Repair failed outlet of clay pipe encased in concrete.~|~04 - Reconstruction - No Added Capacity~|~2EA44298D114955BA09866EEF173E0E440F80F7A 99793~|~1~|~1~|~01/NHS~|~NHS split for resurfacing work. Eligible work to be funded at 80% federal / 5% state /15% local.~|~05 - 4R Maintenance - Resurfacing~|~7C56461EC809C6D738C237389E3243927DA7FEA6 99793~|~1~|~2~|~02/NFP~|~100% local cost~|~05 - 4R Maintenance - Resurfacing~|~3F36077BEAD39D6228AD4B31D67F8E74424F79DB 84731~|~1~|~1~|~01/SAF~|~Clough Pike from Mt. carmel-Tobasco Rd. to Glen-Este Withamsville Rd. The project will add a center turn lane and four foot paved shoulders for a total pavement width of 44 feet. Type 6 curb storm sewers and will be constructed for drainage , also sidewalks will be planned (north side) for future OKI Transportation Enhancement Grant oppurtunities.~|~21 - Safety~|~70EC2244F7DB7C10041AD84164B2A6F480AAFE43 84731~|~2~|~2~|~02/ENH~|~Clough Pike from Mt. carmel-Tobasco Rd. to Glen-Este Withamsville Rd. The project will add a center turn lane and four foot paved shoulders for a total pavement width of 44 feet. Type 6 curb storm sewers and will be constructed for drainage , also sidewalks will be planned (north side) for future OKI Transportation Enhancement Grant oppurtunities.~|~17 - Construction Engineering~|~87A44C9FF3549E0B22B568CF91F41232FFAE080E 98627~|~1~|~1~|~01/BRF~|~OBPP Design/Build bridge replacement of SFN 7033990~|~10 - Bridge Replacement~|~D41FFAC3310539C977653A5B1C67D9EA812EEE1C 124718~|~1~|~1~|~01/SAF~|~Intersection improvement.~|~04 - Reconstruction - No Added Capacity~|~4CD997D7E86CA092C656B700C40BAC813AA8627E 97675~|~1~|~1~|~01/NFA~|~District HQ air handling unit replacement~|~44 - Other~|~979ECA1E84A1BCA0FAC7198CD67AB5C53E39F8A7 96638~|~1~|~1~|~01/STR~|~It is proposed to having a mowing contract on 4-lane highways for portions or all of Distict 9.Contract is for FY 2014 (3rd qtr FY14) to FY16 (2nd qtr FY16).~|~44 - Other~|~26921313630931527BFDC1B53A38760872F21A0E 123542~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~41DD43F171873FB04AA8D4D1E9202312FEDD3B0F 123542~|~1~|~2~|~02/S>2~|~STP > 200,000 plan split~|~05 - 4R Maintenance - Resurfacing~|~F9E9043C2D3E42FD94DB50EDE015E4729B50883B 113115~|~1~|~1~|~01/BRF~|~Replace bridge structure on CR76 at SLM 4.51 - OBPP project~|~10 - Bridge Replacement~|~A33C41627D5E7668BDE683312180C8AEF27A3F67 96053~|~1~|~1~|~01/IMS~|~IM funding for pavement reconstruction, no added capacity (60% of pavement and roadway costs, for items not specifically identified in other splits).~|~04 - Reconstruction - No Added Capacity~|~9E89215B8C55197765222735F017B9F8F0CCE41E 96053~|~1~|~2~|~02/NHS~|~NH funding for pavement construction, added capacity (40% of pavement and roadway costs, for items not specifically identified in other splits),~|~10 - Bridge Replacement~|~EF1208FE7A9A6C553DD8CF4C894817AEFDAE8F54 96053~|~1~|~3~|~03/IMS~|~IM funding for structure replacement, no added capacity:FRA-33-1747 (Third Street over 70/71)FRA-23-1075 (Fourth Street over 70/71)~|~17 - Construction Engineering~|~2774558C7F4725994072F604679D9D50EC636F2A 96053~|~1~|~4~|~04/ENH/Cols~|~MORPC/Columbus funding for aesthetic enhancements on Third St bridge caps, Fourth St bridge, also landscaping along Fulton, Third and Fourth Streets~|~17 - Construction Engineering~|~2E24FF62106BDB06989A8D79493FBFA6BA03D410 96053~|~1~|~5~|~05/NHS/Cols~|~Items to be paid with 100% City of Columbus funding~|~10 - Bridge Replacement~|~64566288F92D21FB9A6CB72B2A91A5FB018EED2F 96053~|~1~|~6~|~06/NHS/Cols~|~Incremental items - Columbus to pay the difference above standard items including brick paver crosswalks, granite curbs~|~04 - Reconstruction - No Added Capacity~|~47B59DFB0403226B24917D847DC8A338A9331046 96053~|~1~|~7~|~07/NHS/Cols~|~100% AEP items to be done as part of the project~|~17 - Construction Engineering~|~90277E91F39919797E6D0FA5426687A0CD53AB8A 96053~|~1~|~8~|~08/NHS/Cols~|~100% AT&T items to be done as part of the project~|~17 - Construction Engineering~|~72E234AFB07D7E29FB72C3CD773F30927ABFB09B 96053~|~1~|~10~|~10/NHS/Cols~|~100% Charter Spectrum items to be done as part of the project~|~~|~0BFFB6E6EF56BAB730E0FDAE9142C7FFBB3B38BF 96053~|~1~|~9~|~09/NHS/Cols~|~100% Lumen (Century Link) items to be done as part of the project~|~17 - Construction Engineering~|~326C7D4DF5AD901E8CE5602CE1BB530B4483FC5A 90591~|~1~|~1~|~01/IMS~|~Plan split for all work on the structures~|~13 - Bridge Rehabilitation~|~64289FA09A1BAE38FDBF44F9578AFF80894504FD 90591~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D4E0515C18D732A2D2C2213AC8BF358F9C7AEB0B 105165~|~1~|~1~|~01/STR~|~Resurfacing on CLI-28 and CLI-73. ~|~05 - 4R Maintenance - Resurfacing~|~8F907F6C39DEE56D6177940D61A7223B80D08A85 120813~|~1~|~1~|~01/STR~|~Guardrail maintenance.~|~21 - Safety~|~F9232D5924980B27E555A71F7ABEA0A93E8B95F6 102329~|~1~|~5~|~05/IMS/AKRO~|~100% Akron items for (SFN 7703368) Princeton St. bridge over I-76 aesthetics (sidewalks, lighting, fence) in the City of Akron.~|~13 - Bridge Rehabilitation~|~305AC485E0903B4C49330DEB08A96C59EB5272CD 102329~|~1~|~3~|~03/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~781849167649495C8A3855FFC11529189C7DEEED 102329~|~1~|~4~|~04/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~471E7091D83CE6C29F5F0D4985C33573A245C4D6 102329~|~2~|~7~|~07/IMS~|~Constructing two new flyover bridges in the central interchange.~|~10 - Bridge Replacement~|~0D2440F8BF565AEEF8B4B1076B31D4D6822D3CA9 102329~|~1~|~1~|~01/IMS~|~Pavement replacement on SUM IR 76 from 8.24 to 10.00 and SUM IR 77 from 9.74 to 11.54 and 15.18 to 15.87.~|~04 - Reconstruction - No Added Capacity~|~B6D316DDC9B47E06466BDC5358CBA0B311D7E2C6 102329~|~1~|~2~|~02/NHS~|~Pavement resurfacing and of SR 8 from 0.63 to 1.75.~|~05 - 4R Maintenance - Resurfacing~|~D73368CECC5E4BF57DD9DD2A1A153D013E278239 102329~|~1~|~6~|~06/IMS~|~Deck replacements > 20' span.~|~13 - Bridge Rehabilitation~|~BF6A070C85D32E7CDB8E91DAA41AA0F487C7BA44 102329~|~2~|~8~|~08/IMS~|~Bridge Rehab work > 20' span.~|~13 - Bridge Rehabilitation~|~AFB19A52CFC63A87C8BC521F5A104B18BE340F6E 102329~|~2~|~11~|~11/IMS~|~Removal of Lafollette structure, replaced with pedestrian structure.~|~10 - Bridge Replacement~|~F607F4CFB188995CB54A96EB662C957EAD70C4CD 102329~|~2~|~9~|~09/IMS~|~Pavement replacement on SUM IR 76 from 10.99 to 12.23 and SUM IR 77 from 11.54 to 12.11~|~04 - Reconstruction - No Added Capacity~|~AB86A0B09CD838D80D40434E02D7D0788AB368DB 102329~|~2~|~10~|~10/NHS~|~Pavement resurfacing and widening on SR 8 from 0.00 to 0.63.~|~05 - 4R Maintenance - Resurfacing~|~24EA921BDD86E4F299798E74B3024AE07388DDB0 102329~|~1~|~12~|~12/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~498521B68CC1DCC80F8FE9D0A96AE251D71CA273 92964~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KNOX" - Knox County bridge replacement~|~10 - Bridge Replacement~|~1603715A397387CA1F2ACA6FC3FCC15A45F3F3F3 122460~|~1~|~2~|~02/BRO~|~Second plan split for construction contract costs above the Project Cap for 4PR7 (PROTECT) Funds.~|~48 - Bridge Protection~|~B64F78DAA22DB8CEEF3D19E6D58E812D483B286A 122460~|~1~|~1~|~01/BRO~|~PROTECT bridge carrying Exit Ramp J over the Big Stillwater Creek by placing Rock Channel Protection to correct Scour.~|~66 - Resilience Improvement - Highway Project ~|~410602E2B383805E4ECABB989629CB2C7DD26EEE 102155~|~1~|~1~|~01/MPO~|~Chessie Circle connector~|~01 - New Construction~|~20D1B22814F766DF525022265F78189E2C725215 83442~|~1~|~1~|~01/NHS~|~Bridge Maintenance~|~13 - Bridge Rehabilitation~|~9CD7D938858D66D7ADE26664B5F44195648DEDB6 93836~|~1~|~1~|~01/NFA~|~Bridge replacement project. VIN 328 9.93, SFN 8202672. Not on any federal aid system funded 100% state.~|~10 - Bridge Replacement~|~1CCD97FBDF0E2ABD160D1E3027AEE81F49D1B5F8 98655~|~1~|~1~|~01/S<2~|~Pavement replacement, new curb, gutter and sidewalk. Upgrade of signals at SR 61 and US 250 on Milan Ave.~|~04 - Reconstruction - No Added Capacity~|~B9473B85177C22780686E298DF9BF057F15127A8 98655~|~1~|~2~|~02/ENH~|~Waterline, 100% local items.~|~04 - Reconstruction - No Added Capacity~|~EC135DA36D19A8CB3EACBC32220B6451BA7477D7 106130~|~1~|~1~|~01/NFA~|~Landslide repair, MRG 669 10.85. Not on any federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B45BAF465BD379F9E386DDC4C8D02C4C698436E9 110059~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 25 & 26~|~17 - Construction Engineering~|~CD903AE05BABE4E65E130C8BBCA52D967ABF1268 95879~|~1~|~1~|~01/NFA~|~At SLM 0.68 on TR403 (Turkey Run Road) it is proposed to build a new structure to replace the low-water crossing. This is funded under SAFETEA-LU and the plan package must be completed and filed by July 1, 2015 with construction in FY2016.~|~08 - Bridge - New Construction~|~C946C77B12DF895506FF822187393CD0C3E6030A 114230~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4.~|~21 - Safety~|~A66AE0587BB7C782358CC51619E7DCF6BB42E260 101375~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 167 0.00 to 3.29.~|~~|~DE6E1F2C872B0092D1E151E9C5028F17873F6067 101375~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~~|~249CAE2872DEE9F1C599677C4FA65CA4434F0FF7 101375~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~83A5EC0838B093481A0D47BFB6870B8230E4D087 116157~|~1~|~1~|~01/NFA~|~Plan Split 01/NFA/PV/~|~05 - 4R Maintenance - Resurfacing~|~573BD423F2C9E1DCA1BB09C79B437609237DBF07 116157~|~1~|~2~|~02/STR~|~Plan Split 02/STR/PV/ ~|~05 - 4R Maintenance - Resurfacing~|~1BA21033A186D741DB8673E8B374283DF56468F7 93709~|~1~|~2~|~02/S>2~|~Culvert Replacement LOR-252-04.34~|~44 - Other~|~6D8D331B81852CD6705D7DCB3D57CDD3220FFD07 93709~|~1~|~3~|~03/STR~|~Culvert Replacement LOR-303-08.42~|~44 - Other~|~A39F0384BD0F8CAF624251AFE183F4301B4E73F1 93709~|~1~|~1~|~01/NHS~|~Culvert Replacement LOR-020-01.06~|~44 - Other~|~B6D946CBF900A43C59B7F2BBD5CF904A2747396B 122889~|~1~|~1~|~01/NHS~|~C.O. Major Rehab funds, pavement and conduit work included.~|~04 - Reconstruction - No Added Capacity~|~2386A31D809E95C0932AC9130C748FE9BCBE5873 122889~|~1~|~2~|~02/NHS~|~C.O. Major Rehab funds, bridge work only.~|~13 - Bridge Rehabilitation~|~D9C03A2EDB7ECAB9411548F7C1CBF5B657C10AC7 122889~|~1~|~3~|~03/SAF~|~Safety-funded improvements (RCUTs)~|~21 - Safety~|~6A998A9CD613E7A209721784EF2DAD90C0638A88 114188~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C94A5F885F6B322D96D5FAC25A96EC0D8A4CC8BC 96855~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various Crawford County roads.~|~21 - Safety~|~D8508D792A58361608CE4908D7CDFCCF3201D436 98932~|~1~|~1~|~01/S>2~|~Glendale~|~05 - 4R Maintenance - Resurfacing~|~44DE9D13D2CDD8347AB787DFB7EBCA0B28C23259 124911~|~1~|~1~|~01/NHS~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~71C0BF06A37C4C745CE4BC435003EB403998CB6A 124447~|~1~|~1~|~01/SAF~|~Safety items.~|~21 - Safety~|~EED56D24A824B627720B82067B8BD1973DAA3BC6 114967~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~23E510DF45604A61728365B188DA3041765D1311 114967~|~1~|~2~|~02/S>2~|~Resurfacing.~|~~|~9AFBE1BA6DA78307DF1298CC0786856B7E47B44F 121898~|~1~|~1~|~01/SAF~|~Install raised crosswalks. ~|~21 - Safety~|~58451C7239DFA361EB9B12C21761706976B63F3C 96078~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge replacement of SFN 2303426 FAI-664-2.16; Not BR Eligible: Length=93 SD/FO(0) SR=78.1 DSR=6~|~10 - Bridge Replacement~|~1A769FEC52AE2B8E28633A32CF8D148A9EB08ED8 125459~|~1~|~1~|~01/STR~|~STP rural bridge.~|~04 - Reconstruction - No Added Capacity~|~8FF3BCC028A34AA57886BAF9F17B7AF883370CD2 125669~|~1~|~1~|~01/STR~|~Plan split for Rural resurfacing. ~|~05 - 4R Maintenance - Resurfacing~|~E0B62CAC01234749A4BBE8B65005C298EC7DBE0C 92443~|~1~|~1~|~01/CMQ~|~Construction of turn lane on SR-46 at new South Range school complex, resurfacing of SR-46 from SLM 4.42 to SLM 4.80, in Mahoning County, Ohio.~|~21 - Safety~|~C4CC10A53E6E98579D52E042E5CA8797C6C87862 118468~|~1~|~1~|~01/NHS~|~Concrete Repair on MED-224-15.27 to 15.586 (MED-224 at Lake Rd intersection)~|~05 - 4R Maintenance - Resurfacing~|~7DD600A5F1955D14D4F375138A9B40EE5F1409D6 93690~|~1~|~1~|~01/STR~|~For all work other than the section of SR 67 that is in the City of Upper Sandusky. All funds from the District Preservation Program budget. 4PF7 (80% Federal)/4PS7 20% State - No Cap~|~05 - 4R Maintenance - Resurfacing~|~B4C3AC6DF17660650963CEC588672C8B3B5023CB 93690~|~1~|~2~|~02/S<2/USAN~|~Work on SR 67 in the City of Upper Sandusky. From SR 53 SLM 17.60 to the corporation limits at 18.15. Only the south side of the road is in the city and in this plan split. The 80% federal funds will be from the District Preservation Program budget. The 20% match will be provided by the City of Upper Sandusky.~|~05 - 4R Maintenance - Resurfacing~|~D1B6803B76D9C63C303D85AEDD3FE7E86A783751 99613~|~1~|~1~|~01/IMS~|~Provide new concrete overlay on BEL-470-0239 (SFN 0706221)~|~13 - Bridge Rehabilitation~|~D8EF4F14153ACDB38166244DFB0F5553F179EB1D 102943~|~1~|~1~|~01/NFP~|~Guardrail Maintenance~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D61358383819DAA18064E046F49157A5C580464 84829~|~1~|~2~|~02/S<2~|~District Allocation Funds for Pavement Replacement Project (Village of Sheffield). SLM 26.67 to 26.69~|~04 - Reconstruction - No Added Capacity~|~934739A279A75874004DE6127DFACC5F39AC8EF9 84829~|~1~|~1~|~01/S<2~|~Pavement Replacement.Priority 1 - Lorain Co. TID SLM 26.67 TO 27.34Priority 2 - Jobs and Commerce SLM 26.67 TO 27.34Priority 3 - Fed/Local(OPWC) SLM 26.67 TO 27.34, 4PF7 capped at $350,000Priority 4 - Local(OPWC) SLM 26.67 TO 27.34Priority 5 - Local(4BG7) SLM 26.67 TO 27.34OPWC capped at 31% or $450,000, whichever is less.~|~04 - Reconstruction - No Added Capacity~|~A75421B9225C211AE790A7AB70E97466B26813F9 97589~|~1~|~1~|~01/NFP~|~Split~|~21 - Safety~|~E0B47946972C468C13D9C1796DDBA44681E15D56 116341~|~1~|~1~|~01/STR~|~plan split for the rural sections~|~05 - 4R Maintenance - Resurfacing~|~1F22DCA875C0072BE9B341AE9282B2A3B6FA7A4C 116341~|~1~|~2~|~02/S5K~|~plan split for the small urban section~|~05 - 4R Maintenance - Resurfacing~|~FABA0F4E6DBE5BF53D6949DE8A51F56FF8A0E089 96980~|~1~|~1~|~01/S>2~|~Signal upgrade at SR 446~|~21 - Safety~|~1DC5E9B6532A9AB7F8275D12EE741B96603AFB84 84017~|~1~|~1~|~01/STR~|~general system resurfacing, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~8D0BDB7460481D647CFF81ED363399EB45523D3F 97813~|~1~|~1~|~01/NFP~|~Various bridges.~|~17 - Construction Engineering~|~CD239BE73EF7AD23FAB394CC6E42539518016C60 116201~|~1~|~1~|~01/BRO~|~Plan split for bridge~|~47 - Bridge Preventive Maintenance~|~9FD7369445073B8A6E6F0E8C429E3F00389DB2E8 119133~|~1~|~1~|~01/BRF/STCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~A578105E9C07AA652965141623489EAC6D1D8003 121963~|~1~|~1~|~01/SAF~|~Safe.~|~21 - Safety~|~098B857A5F3D330EAD4BFB15422319E3A6EC234F 115757~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on HAM-22 ~|~05 - 4R Maintenance - Resurfacing~|~B91F122BA6DFD9F5820C2DB0C4AC051ACA52001E 115757~|~1~|~2~|~02/S>2/MONT~|~Plan split for the 100% City items on the urban paving on HAM-22 ~|~05 - 4R Maintenance - Resurfacing~|~BA2387C2A774F2C089DC68C4C4E6CA1558C8941B 85113~|~1~|~3~|~03/STR~|~Resurfacing SR 43 from SLM 9.50 to 11.07. Includes all resurfacing work on SR 150 and SR 647 in Jefferson County.~|~05 - 4R Maintenance - Resurfacing~|~516A5595F9BD76FF4B556369625CF500ED797CDF 85113~|~1~|~2~|~02/S<2~|~Resurfacing SR 43 from SLM 9.38 to 9.50.~|~05 - 4R Maintenance - Resurfacing~|~A9A0EB028DBFB940F3FFBC839F56E33A6663B7D1 85113~|~1~|~1~|~01/NHS~|~Resurfacing SR 43 from SLM 5.58 to 9.38 near Wheeling-Bridgeport and Steubenville-Weirton urban areas.~|~05 - 4R Maintenance - Resurfacing~|~EF4EF30EEDB9B62E079BF4AEE618F308C288CBD5 113435~|~1~|~1~|~01/SAF~|~Part 1: Pedestrian improvements along Main St~|~21 - Safety~|~4EC38F25EC1AE31F6F87B0C07532536B7300112F 113435~|~2~|~2~|~02/SAF~|~Part 2: Improvements at two roundabouts on Main St~|~~|~4D02F7D7E256C2693350CDE2DDF4547AFB546C96 113435~|~2~|~3~|~03/SAF~|~Part 2: 100% City items for the roundabout improvements~|~21 - Safety~|~C1A03A8AB0E7802F00A4F143352993C7EE05E8BB 97115~|~1~|~1~|~01/BRF~|~The replacement of SFN5342295 and 5632951.~|~10 - Bridge Replacement~|~F221E46CA15B030FCCF23439176529364315FEB6 119345~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~04EA8CC9D16A30E19199FED4DEAD641F0BE4B853 108407~|~1~|~1~|~01/S<2/TRNT~|~Landslide repair from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~938C986CB52FD022E58FB3BBB1B1B0F5F2583D22 95238~|~1~|~1~|~01/MPO~|~MPO-STP funds. 80% Fed.(SAC 4TA7) - 20% Local OPWC (SAC 4BG6)~|~04 - Reconstruction - No Added Capacity~|~9B810D5243145B2504F3176BF0699DE8BB2941E4 95238~|~1~|~2~|~02/CMQ~|~MPO-CMAQ funds. 80% Federal (SAC 4TB7) and 20% Local OPWC(SAC 4BG6). For CMAQ eligible work to install sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~3921AD933ABDD01C4EDB16B75BEC461E2FB7900D 82403~|~1~|~1~|~01/MPO~|~Widen TR229/Bixby Rd from Ebright Rd to US-33. Add street lights, sidewalks/mulituse path.Local Sponsor - FRA County Engineer~|~~|~858650F2F9B298666F151ADA36DBEF29A1B4DED4 106534~|~1~|~1~|~01/NFA~|~ADA CR 9B 30.40 (SFN 0133019)~|~10 - Bridge Replacement~|~975E9CE9966859DE31B7172C542CD3DEC2374697 115685~|~1~|~1~|~01/BRO~|~Work associated with rehab of Beecher Gamble over 33 structure.~|~13 - Bridge Rehabilitation~|~565DBA1FCA5A004AEE54847967D50BD12D7711B1 115685~|~1~|~2~|~02/ENH~|~Install Pedestrian Hybrid Beacon and sidewalk along SR 750~|~28 - Facilities for Pedestrians & Bicycles~|~4342DD50F530E6DE891A388053DA44719B434C3F 115685~|~1~|~3~|~03/S>2~|~Extend curb and gutter along SR 257~|~04 - Reconstruction - No Added Capacity~|~FBED23C2EAF3AC77AE1C8F1F6BE5AA1C74406B8B 101729~|~1~|~1~|~01/NFP~|~Place protective netting on structures~|~47 - Bridge Preventive Maintenance~|~DAAE9184F00F6291CF73143CA61C5F4E656D3C4F 93747~|~1~|~1~|~01/SAF~|~Construct widened shoulder along Indian Trail with street lighting, Install four-way stop at the intersection of Park Avenue and N Parkway Drive with ADA compliant curb ramps. Install new and repair deteriorated sidewalk with ADA compliant curb ramps along Scott Street, Walker Street and Gill Street. Remove traffic signal installations and replace with rectangular rapid fladhing beacons and ADA compliant curb ramps at intersections along Broadway Street, W. Greene Street and N. College Street.~|~21 - Safety~|~B4FC6DE539A9732616782A778C9963C4FE96B8D3 112773~|~1~|~2~|~02/SAF~|~Plan split 2 for the large urban location:HAM-22 & Finley Ln~|~21 - Safety~|~51F222067C03A28ED39840F08E161B59E9BDB611 112773~|~1~|~1~|~01/SAF~|~Plan split 1 for the interstate locations: HAM-74 intersection & HAM-128HAM-275 & Mosteller Rd~|~21 - Safety~|~2FAFCFAA7BDFB2D2B96447442015AEADC1840621 112773~|~1~|~3~|~03/SAF~|~Plan split 3 for the NHS location: BUT-27 & Stillwell Beckett Rd~|~21 - Safety~|~ECF03510E1A36C568969E741BAB598B2CE4608EA 112773~|~1~|~4~|~04/SAF~|~This plan split 3 is for the rural location:HAM-128 & New Haven Rd~|~21 - Safety~|~71C4A9D69F3A56656A044D214331191F95C8C785 112773~|~1~|~5~|~05/NFP~|~Plan split for 100% locally funded signal enhancements (decorative finish on traffic signal poles and illuminated street name signs) in Sycamore Township.~|~21 - Safety~|~323164F826DB223EEA33E5E35BB6D37402445350 99219~|~1~|~1~|~01/NFA~|~Adding J&C Funding Event.~|~03 - Reconstruction - Added Capacity~|~2DD040441F950C51A4FBB76D9E2F0FE4C026C83B 117656~|~1~|~1~|~01/S50~|~Bridge repair needed due to strike accident~|~13 - Bridge Rehabilitation~|~FA87026D9E6DF2E3901DC93D916F540FAA064766 95821~|~1~|~1~|~01/STR~|~STP Rural, HOL-514-4.53 culvert repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~FFAABD11B5305073987B515846544AD3AFFB46F5 110126~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~B4F5C179E57D5F8FE9C66F0D5DAD638870DA50F6 95342~|~1~|~1~|~01/STR~|~Culvert Project on SR772Culvert replacement at PIK 772 0.98 & ROS 772 2.50~|~44 - Other~|~C3673FFA1794708769113D341DBF303B41A4D10E 116846~|~1~|~1~|~01/ENH~|~Add sidewalks and lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~8B35ADF70A388A83DE13811243202FD969626DC9 109243~|~1~|~1~|~01/SAE/TUS~|~Pavement marking on various county routes with 100% CEAO Safety funding (4HB7).~|~21 - Safety~|~BAE5EDBDB159D9AD452837B9EC7E863E9D1DABD3 105674~|~1~|~1~|~01/IMS~|~AC overlay with repairs on CLE IR 275 0.00 to 6.51.~|~05 - 4R Maintenance - Resurfacing~|~50818F4E5AAD2A65745633A47D41FF4B0945B251 93800~|~1~|~1~|~01/STR~|~Replace Brdge 0103934Project Termini: Located 1.91 miles south of SR137 on SR247. Project Description: It is proposed to replace the structure. 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~6B3A8021D3815D42DBBB902110F5499F24301482 104493~|~1~|~1~|~01/MPO~|~plan split~|~04 - Reconstruction - No Added Capacity~|~9562A138073293DADD391AC454ECFEA0F33CF45A 108400~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 25.90. DSR WAS-014. Rural other federal aid funded 100% federal ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2B3DAD02CB8F8C5D3F409FD6456A57448722931A 122394~|~1~|~1~|~01/NFA~|~Plan split for resurfacing Maumee River Weir Rapids~|~05 - 4R Maintenance - Resurfacing~|~7DEF18914322CE357877B92D3FAA370B50CB3448 120461~|~1~|~1~|~01/SAF~|~Guardrail replacement project. Various routes in Vinton County. Funded 100% Federal. ~|~21 - Safety~|~51E881B635AE1ADE8EFED2BD0BE79CDB352EBDD9 120461~|~1~|~2~|~02/SAF~|~Guardrail replacement project Part 2. Funded 100% Federal.~|~21 - Safety~|~D2092078C6E647B95195727B4E42B5C3D5275FDB 97484~|~1~|~1~|~01/NHS~|~LAW US 52/ Solida Rd Interchange.~|~04 - Reconstruction - No Added Capacity~|~72041B0D2BD51AFDA74A806C11C7D6C3E3BAF48C 104239~|~1~|~1~|~01/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the Steel Deck Grating on SFN 6000495, Mus-US-22-11.59~|~13 - Bridge Rehabilitation~|~62BD6FB936401F5728230B097BDFEAB91F8F8DF9 96314~|~1~|~1~|~01/IMS~|~IR Bridge Funds 90/10 Fed/State. Non-BR eligible~|~~|~E48FD5D2712A7044C9E4CEBB5AC190024EF2B2A2 91746~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a fine graded polymer treatment. MEG 124 12.49-16.67, 27.77-29.55. Rural other federal aid funded Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~FAEE9C6C2942231DAF3AC345B30F636EB53156FF 91746~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a fine graded polymer treatment. MEG 124 20.62-27.77. Urban other federal aid funded Federal 80% and State 20%.~|~17 - Construction Engineering~|~3321A3EDF60877B6147A62CE5C99E11D625AC877 112834~|~1~|~1~|~01/NFP~|~Spot paving various locations throughout District 11~|~05 - 4R Maintenance - Resurfacing~|~DB0ACABF3F64C5DE4F702A4CC87704B9E9ADEDD2 121872~|~1~|~1~|~01/NHS~|~All work included in this split.~|~13 - Bridge Rehabilitation~|~A9A36BAE07714123F2780DCD4A8FAB25C1A26217 106960~|~1~|~1~|~01/STR~|~Construct IR 71 NB and IR 71 SB entrance ramps and extend Sunbury Parkway to 3B's & K Rd (Plan splits will be needed for NHS and STP as project develops)~|~01 - New Construction~|~29B04BCCD4384279D2997E2B8E8DE2D85BB44873 98057~|~1~|~1~|~01/NFA~|~Adding CO CO Contr Phase~|~04 - Reconstruction - No Added Capacity~|~DEB49C8C481405634E7AD8EDB82AA8A26AB6C936 76463~|~1~|~2~|~02/NHS~|~Asphlat overlays, patching, sealing:6501028 PIC US23 14.1 Intersect: Cook Ditch6501052 PIC US23 14.53 Intersect: Walnut Cr6501087 PIC US23 14.53 Intersect: Walnut Cr6501117 PIC US23 20.28 Intersect: Bulen Ditch02/NHS/BR/~|~13 - Bridge Rehabilitation~|~3F45AB36858B5B0D78CC4E42723D6B40EFF1A251 76463~|~1~|~1~|~01/NHS~|~Minor rehab of pavment PIC-23: 12.92-23.1601/NHS/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~533CE62489F43BA83CB3F529FA7E4A34C3E8D2E7 108092~|~1~|~1~|~01/IMS~|~Bridge rehab on interstate route bridge.~|~13 - Bridge Rehabilitation~|~D18E2EEBD5BB712EDB759107F9FF52FA94A0B7F0 108092~|~1~|~2~|~02/S>2~|~Bridge rehab on large urban route bridge.~|~13 - Bridge Rehabilitation~|~5CE6BA90F8FB969FA0554666F1A8541EC946386B 108092~|~1~|~3~|~03/NHS~|~Overlay using hydrodemolition ~|~13 - Bridge Rehabilitation~|~4FDE792C7A10CC02EB34F5D01547F01771C59923 95400~|~1~|~1~|~01/ENH~|~Reconstruction of two concrete stairways to Walnut Beach and Point Park at Ashtabula Harbor, Ashtabula County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~205328F244AE8F29F4637B9C40B99A77EBF463A9 88410~|~1~|~1~|~01/NHS~|~Bridge replacement project. VIN 93 1.26. SFN 8200904. NHS route funded 80 federal/20 state.~|~10 - Bridge Replacement~|~3F353B36C6A20EF4DA4AEFF3228B8A0FCDEEB29F 101580~|~1~|~1~|~01/S<2~|~DSR#JEF-015~|~04 - Reconstruction - No Added Capacity~|~C41A488066D23C70B395C1F6F5A5CA84526CC228 116965~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 218 14.77 (CFN 1820295), GAL 554 10.53 (CFN 1833135) and GAL 588 6.42 (CFN 1831201).~|~04 - Reconstruction - No Added Capacity~|~B36E72D14F25F84BEB727235D48917CB0E505E41 87295~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on the Rural portions of SR 126 in Bulter County. The limits of the Rural portion are on SR 126 between SLM 0.0 to 7.66.~|~05 - 4R Maintenance - Resurfacing~|~707EB5FC0D3C8B74701A1608C2A51A34B2FC427A 95978~|~1~|~1~|~01/NFP~|~Construction of fabric salt building.~|~~|~1FE2B1218AB4852ADE2000EFD844086BA21CF180 116016~|~1~|~1~|~01/STR~|~All work in this project. Funds will be from the Geologic Site Management (GSM) program until the cap is reached then funds from the District Preservation Program budget will be used.~|~~|~217CF785F0DB2D15CA2BD0472990383DD0B1C35E 110075~|~1~|~1~|~01/IMS~|~DEL 23 from 10.63 to 10.81, DEL 23 from 17.75 to 17.85~|~05 - 4R Maintenance - Resurfacing~|~EA5109A421749EBDFE6D7BD0EA358442B22F1958 92647~|~1~|~1~|~01/SAF~|~90/10 - Safety Funds (capped) / Priority 2 is 100% 4BG7 (Erie County)~|~21 - Safety~|~0EF881DD26E31E54087BD7EF0321C4D05BD581AA 92647~|~1~|~2~|~02/SAF~|~100% State Funds (4BC7) for Pavement Fabric~|~21 - Safety~|~5B5F007107B11A0F80375FCE51ED1967EDEF410E 92647~|~1~|~3~|~03/SAF/ERI~|~Waterwork Erie County Department of Environmental Services is responsible to pay for.~|~21 - Safety~|~41147F393E514347CE5BE4793BDD9116B5B6CBAF 91519~|~1~|~1~|~01/NHS~|~Replace both structures (not BR eligible for replacement)SFN 5100542, MAR-23-7.66R, Grave CkSFN 5100518, MAR-23-7.66L, Grave Ck~|~13 - Bridge Rehabilitation~|~9C54FAD710B0DD57D7969F84C66DE5C718F223C2 112825~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~2080CBA6FFE4E2E445B4C48128C6DC4CF785DCF2 97327~|~1~|~2~|~02/NHS~|~"02/NHS/CV/ " - District Preservation Culvert Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Culvert liner on: 1) Mus-SR 16-05.54; 2) Mus-SR 16-08.04; 3) Mus-SR 16-08.22; 4) Mus-SR 16-11.12;~|~04 - Reconstruction - No Added Capacity~|~5E70D52FEDD96929A0D2A2C238E6607E73D7C489 97327~|~1~|~3~|~03/STR~|~"03/STR/CV/ " - District Preservation Culvert Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Culvert liner on: 1) Cos-SR 83-07.94; 2) Cos-SR 83-07.96;~|~04 - Reconstruction - No Added Capacity~|~A894E25D9837AFB01C945570EE063290BA13C848 97327~|~1~|~1~|~01/IMS~|~"01/IMS/CV/ " - District Preservation Culvert Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Culvert liner on Mus-IR 70-03.88;~|~04 - Reconstruction - No Added Capacity~|~B342220BD5110EC965033C4855557653587CB4D4 104021~|~1~|~1~|~01/NFA~|~TR-185~|~05 - 4R Maintenance - Resurfacing~|~8C8804F05B20CC26C7E1BE61A0F084FBA1023640 126583~|~1~|~1~|~01/SAF~|~Primary plan split~|~21 - Safety~|~595690560298D709F57F57AB58D296D14497C99D 126419~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with RepairsLOR-511-7.407 to 18.375Fine Graded Polymer Asphalt Concrete OverlayLOR-301-6.304 to 7.622LOR-303-11.012 to 12.037~|~05 - 4R Maintenance - Resurfacing~|~F5392A8ECF9759103F8BAAD29F9F2C34FADD8FF3 126419~|~1~|~2~|~02/STR~|~Partial Depth and Full Depth pavement repairs on LOR-511-13.543 to 14.264 - village of Kipton~|~~|~82DD9EF1CE8A180AE6184CE4D86430C4BDD8EDB6 126419~|~1~|~3~|~03/STR~|~Partial Depth and Full Depth pavement repairs on LOR-301-6.304 to 7.857; LOR-303-11.012 to 12.037 - village of Lagrange~|~~|~9CD605287497940CF9D8F59A32D9184529F87097 125653~|~1~|~1~|~01/BRF~|~All bridge rehab work included in this plan split.~|~13 - Bridge Rehabilitation~|~DA634AAFE1FD0E36A08432DBF70DB0CBC9247494 91952~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. Funds for 1 year~|~21 - Safety~|~65DC2743F37030BBB281CDA6520E919B91D557AE 126660~|~1~|~1~|~01/STR~|~Bridge replacement~|~10 - Bridge Replacement~|~11341BCC046713D060B6B46CD02D5DBE8BF09340 99852~|~1~|~1~|~01/MPO~|~Covers work to widen Hamilton Rd, Morse Rd, and to add multi use path.~|~03 - Reconstruction - Added Capacity~|~F29A4CA00836DD8037689A1977530A25EF51813F 117940~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~CF10BAF9A9147A43F3B0E195ECFF38F6F88D1D25 111630~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items within construction and CE to be paid with SAC 4TA& (NOACA)~|~05 - 4R Maintenance - Resurfacing~|~A4980912D7B571D27E84E6855FB7B9DD2B7E84F8 121277~|~1~|~1~|~01/STR~|~All Work is within this split.~|~13 - Bridge Rehabilitation~|~D60290474118B751FB9800A0763947F027015E8D 87033~|~1~|~1~|~01/SAE~|~Systematic RPM replacement and District striping.~|~21 - Safety~|~BBF9BB37EF8815716C3255ED079C67F9D9407464 99748~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~63D27A1D258329D0EAE53BE41CB2401E1CF1A0BF 86893~|~1~|~2~|~02/SAF~|~100% State Safety - Pavement Fabric~|~21 - Safety~|~153694D851B1F4969E9B61D7DF83510FF3248B3B 86893~|~1~|~1~|~01/SAF~|~Intersection Improvement - Add Lanes~|~21 - Safety~|~1B05F8255CBA201A3860F7157DDC10B209BC2BB4 103134~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY18 Construction Engineering Services~|~17 - Construction Engineering~|~DFB4F978189F6149D0A0E6E7F0C46939D3B2CBC2 103134~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY19 Construction Engineering Projects~|~17 - Construction Engineering~|~6CF84569C2E53D378891D46EA41CB4C658FC2F51 103134~|~1~|~3~|~03/STR~|~Plan split for D5 projects.~|~17 - Construction Engineering~|~B665987999E1C84997A2828B3058BF922D9382A6 103134~|~1~|~4~|~04/STR/1~|~Plan split 4 for FY 21 Construction Engineering Projects~|~17 - Construction Engineering~|~C726B6668AF24C058B47392AD2A6B2745F5E3A68 123955~|~1~|~1~|~01/STR~|~geotech engineering.~|~04 - Reconstruction - No Added Capacity~|~2916FD52F1D2EB35B399E3167F196CEDC88A6730 98391~|~1~|~2~|~02/NHS~|~Minor Bridge Work on SFN 7605021 STA 93 11.87 over branch of Tuscawaras River~|~~|~9AF2299C5117CDB1185611F2D535C5508DF45916 98391~|~1~|~1~|~01/NHS~|~Resurfacing STA 93 11.71 to 12.43~|~~|~ABFCF7728F4400A9AD192605DBEFD798BA73F7A8 106857~|~1~|~1~|~01/NFP~|~Rehabilitation and resurfacing of various park roads and parking lots within Winton Woods Park in Hamilton County, OH.~|~05 - 4R Maintenance - Resurfacing~|~E38935CA19C33522554407B9E4E61D174FA12880 119858~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded scope items to address sidewalk gaps and related improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~F8082C24B03DFFB33E82A7DF1CB49F7171F42CA1 93190~|~1~|~1~|~01/S>2~|~General system paving of DEL750: 4.43-7.06~|~05 - 4R Maintenance - Resurfacing~|~A4FDF0DB6BC84771BF7A43B088387C3E79BC2191 124551~|~1~|~1~|~01/NHS~|~Conduit~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1376059A1105464BCA8EFAF3C36B9742B8B2DE45 112991~|~1~|~1~|~01/NHS~|~Spot Paint and rehab sound wall of 3118460. Spot paint 3104923. Paint, replace joints, and seal SFN's 3104990, 3105008,3105024. Repair sound wall on 3104915.~|~47 - Bridge Preventive Maintenance~|~173F280D0A4FFE25D8F80166295D75E86E0E5710 109227~|~1~|~1~|~01/NHS~|~Pavement Replacement Cost~|~04 - Reconstruction - No Added Capacity~|~FF5427F54333846CF23113B9DC1E56979996B9C1 109227~|~1~|~3~|~03/NHS~|~MED-42-2090 SFN: 5201772 (Small Ditch)Length: 14' (FHWA does not classify this as a bridge)Excavate down and rebuild top of leaking box culvert structure, under existing guardrail location. Waterproof the repaired area and under the nearby sanitary line. This area is on the east side guardrail. It is either beneath the guardrail or the existing 21" diameter sanitary line which is inside the 30" steel casing pipe.~|~04 - Reconstruction - No Added Capacity~|~F16937D6ECFD7C73215B2D1B94BA459CA23E9E22 109227~|~1~|~2~|~02/NHS~|~MED-42-1986 SFN: 5201721 (W Branch of Rocky River)PN 512, Item Special - Repair approach slab at forward abutment in NB lane near outside lane line - Type B or C. Item 516 - Repour 516 joint between repaired slab and backwall (This may have been patched since 2020 - Designer to verify)Replace all type 5 guardrail panels on bridge. They are rusting out.~|~13 - Bridge Rehabilitation~|~A733FEB430D172610426AD6631E13B3D6BDC0D7F 115853~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~6C3AB2293890F6FE58744B6D81F251C9ED1FEFB5 114208~|~1~|~1~|~01/NHS~|~ROS 35 20.42 SFN 7102194 bridge repair~|~47 - Bridge Preventive Maintenance~|~AC048AA06DFE2436C6862F7252A559AD78FE90EA 121507~|~1~|~1~|~01/BRF~|~UNI CR 67 3.408 Bridge Replacement over Big Darby Creek~|~10 - Bridge Replacement~|~108DF3183774CFC1799ED96C890D50688F75B492 94667~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 676 0.00-4.30. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~B50EAC2840F047ED027C9A79E952A080C5900CB2 94667~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 676 0.00-1.97 and WAS 676 4.30-12.27. Rural other federal aid funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~E7C7E0BEBEDF89E393F9FE1E7D1371EBE93CE6E5 109269~|~1~|~1~|~01/NFA~|~PIK CR VAR PM FY24~|~21 - Safety~|~946B30C9C891215C363BEE26D679DE85477F1F93 97187~|~1~|~1~|~01/NHS~|~Ohio's portion of the project.~|~47 - Bridge Preventive Maintenance~|~BD6AF36D9B931E1CC1A63A6BC0D6D096CD257CFC 97187~|~1~|~2~|~02/NHS~|~KYTC's Share of the project.~|~47 - Bridge Preventive Maintenance~|~D4253A297395DB4A9A31F51E6963EF98ED4376E1 94167~|~1~|~1~|~01/BRO~|~Deck overlay & abutment repair on structure - BR eligible SFN 2101629, DEL-37-22.13, over Priaire Run~|~13 - Bridge Rehabilitation~|~A7BB99AF0E468BCE3DE3198DA56E3598F2601529 120451~|~1~|~1~|~01/S>2~|~Bridge Rehabilitation on TR 221 (Benedict Rd) SFN: 5932602~|~13 - Bridge Rehabilitation~|~5D4863B9E2AEB132BAE86EAF8C8902CBEA90EE0E 96193~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~C9B3673FD94BD291AFBC5C984751CAD2A407F788 110755~|~1~|~1~|~01/STR~|~Work to resurface Aquilla Road that is eligible for federal-aid for the rural portion~|~05 - 4R Maintenance - Resurfacing~|~C03BDECF71D855A519FD1C14FC0C137ED97A0622 110755~|~1~|~2~|~02/S>2~|~Work to resurface Aquilla Road that is eligible for federal-aid for the urban portion~|~05 - 4R Maintenance - Resurfacing~|~B2962C912F300906676EE87ABCD83F6AB39F2CC1 80121~|~1~|~1~|~01/S<2~|~District Allocation~|~04 - Reconstruction - No Added Capacity~|~F82209578D539621A0FD4A1A9CCA1CB241976A68 95261~|~1~|~1~|~01/SAF~|~Relocate CR 20 and TR 224 on ATH 690 1.60 to improve sight distance. Safety project. Funded 100% state.~|~21 - Safety~|~2F567474E11E5D6683B4E224612710B55FA445B3 97122~|~1~|~1~|~01/BRF~|~The replacement of SFN# 245607~|~10 - Bridge Replacement~|~1ED3B835F4C7DADF020A453BB7B57BC8542508FC 97122~|~1~|~2~|~02/BRO~|~The replacement of SFN# 0254134 & 0254118~|~10 - Bridge Replacement~|~90A0EB0FE367691DF4650A4A3B3C22E1402C7C81 99866~|~1~|~1~|~01/NHS~|~Remove and replace existing culvert.~|~44 - Other~|~0E04D118D1618BD5885E932DDC9D02E1F761419C 125013~|~1~|~1~|~01/SAF~|~Guardrail replacement/installation on HOC CR 300 0.00-2.41. Funded 100% Federal.~|~21 - Safety~|~7AE75B83EFB4CDBCE3DEFB2F3987CBF6AD29979E 96139~|~1~|~1~|~01/NFA~|~Construct a new 1,000 ton salt storage building at a new St. Marys Yard Facility.~|~44 - Other~|~8B9ABCB9866B13C93E58B3984E93BD761A2C3C73 123566~|~1~|~1~|~01/SAF~|~Lighting replacements along HAM-71~|~21 - Safety~|~F8F2D244C99B47CE480A2F8DE3B694809F932046 99227~|~1~|~1~|~01/S<2~|~Mill 1.5" and resurfacing of CR-7 (Farmers Road) and CR-8 (Cuba Road), within the City of Wilmington small urban boundary.~|~05 - 4R Maintenance - Resurfacing~|~69623901F29CBBB421D890572CA0CA4D30A69D2D 99227~|~1~|~2~|~02/STR~|~Mill of 1.5" and resurfacing of CR-7 (Farmers Road), CR-8 (Cuba Road), and CR-19 (Second Creek Road) outside the small urban boundary of Wilmington with 2" of new asphalt.~|~05 - 4R Maintenance - Resurfacing~|~76AA6FFD01443740493381B8B4E9985926F1F1CE 99227~|~1~|~3~|~03/NFA~|~This plan split covers the improvements on the off-system portion of Cuba Road (SLM 0.56 to SLM 4.07).~|~05 - 4R Maintenance - Resurfacing~|~95D233B651056B9FD01E863FEC2799C82140D268 88511~|~1~|~1~|~01/STR~|~Resurface section sWOO US6 11.71-12.71; 12.94-13.74; 14.81-21.04 on this plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2877DC29476EDE906D290DC0182B6802F1765002 88511~|~1~|~3~|~03/S<2~|~SFNs: 8700214, 8700249, 8700273, 8700303, 8700338, 8700362.~|~13 - Bridge Rehabilitation~|~3FD8A318BF2725BF8683AF3DA2495228A6B3AF5C 88511~|~1~|~4~|~04/STR~|~SFNs 8700427, 8700451~|~13 - Bridge Rehabilitation~|~A7F1B377F07D85DAF7F4D1D6BCD786F9609EEF7B 88511~|~1~|~2~|~02/S<2~|~This is on US-6 from SLM 12.71 to 12.94 in Bowling Green and 14.58 to 14.81 - Urban Paving~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E6076200BE71F8E02CD99BF632FCAF5F999A55E8 124904~|~1~|~1~|~01/NFP~|~Plan Split for TSMO related work ~|~24 - Traffic Management Engineering - HOV~|~021C489F0498E1559F8330E66D02499B59A851D6 105089~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~73343EFE49D9E026136DD5A6CA8ACC28551ED20B 105089~|~1~|~2~|~02/NFA~|~02/NFP/PV/ - Plan Split 2~|~~|~73E99A14038EC6755ED5CEFA4519CBA08E94F7E1 108542~|~1~|~1~|~01/S>2~|~Pedestrian enhancement improvements that are eligible for federal-aid from NOACA's TLCI Implementation Program~|~21 - Safety~|~B2D7F20AE6770288E33FFEFE06A139CB4BDD75C5 108542~|~1~|~2~|~02/NFP~|~City requested work items that is not-eligible for federal-aid~|~21 - Safety~|~91D2E977BA61A25EFB6ADDD8290AF509333F6CDD 84543~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. VIN 160 0.00-3.69 and VIN 349 0.00-1.28. Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~E65D744CB667E5A016EA5246383DEA50B6211932 98152~|~1~|~1~|~01/STR~|~SR 327 (6.08-6.10)SR 327 (11.61-11.62)80/20 Federal/State~|~05 - 4R Maintenance - Resurfacing~|~7151959B120D1E43CF69648AE16FA254970EA648 98152~|~1~|~3~|~03/NHS~|~SR 327 (7.26-7.64)80/20 Federal/State~|~05 - 4R Maintenance - Resurfacing~|~DC4C09E0BD061375BB525B53D220289EEB05E293 98152~|~1~|~2~|~02/S<2~|~SR 327 (6.10-6.76) (7.22-7.26) (11.60-11.61)SR 124 (17.09-17.55)80/20 Federal/State~|~05 - 4R Maintenance - Resurfacing~|~24CD78EAC71CE3E12C77A4C27B0BDE77B41426AA 98152~|~1~|~4~|~04/NHS~|~SR 327 8.48 (SFN 4003543)80/20 Federal/State~|~13 - Bridge Rehabilitation~|~9177315D549D33429CF56FE01458E26BE107EADF 98152~|~1~|~5~|~05/NHS~|~SR 327 (7.64-8.93)80/20 Federal/Local~|~05 - 4R Maintenance - Resurfacing~|~63514D21834DF3E9797A6B133215C9961BC353F5 98152~|~1~|~6~|~06/S<2~|~SR 327 (9.79-11.60)80/20 Federal/Local~|~05 - 4R Maintenance - Resurfacing~|~837E1F5ED4F1E1134D8E3B5328BD68E39CB90BB2 98152~|~1~|~7~|~07/NHS~|~100% Local for curb ramps & full depth repair.~|~05 - 4R Maintenance - Resurfacing~|~988D8C0569BE289906C856984CF2C27B8A0B92A9 115232~|~1~|~1~|~01/ENH~|~Multi use path. Funding from the Transportation Alternatives Program (TAP). After the TAP cap is reached all funds will be 100% local funds provided by the City of Findlay.~|~28 - Facilities for Pedestrians & Bicycles~|~8BE9275C52E396C6EF50671FFDF0B38D23054E89 109596~|~1~|~1~|~01/SAF~|~Plan Split for Safety improvements~|~21 - Safety~|~FBB2575D34F73788F5470D117BCF3F244FBF2A66 109596~|~1~|~2~|~02/NFP~|~Landscaping~|~31 - Landscaping & Other Scenic Beautification~|~348EDDEA8657AEDE7C2404DE43158213031A58A0 86293~|~1~|~1~|~01/BRO~|~Bridge replacement over Sugar Creek. SFN 4903935~|~10 - Bridge Replacement~|~CA7176836C62A096036A32CF9E32479ABEEE902F 125675~|~1~|~1~|~01/NFA~|~Plan split for the resurfacing on the Not Federally Eligible section of SR 748~|~05 - 4R Maintenance - Resurfacing~|~930B0CAEE8E449BBA624010235CDFF327AEF3309 84388~|~1~|~1~|~01/NHS~|~NHS Plan Split for preventative maintenance paving~|~47 - Bridge Preventive Maintenance~|~1450F1EE3E538AB74A49F3B70896C1934B529CDA 114189~|~1~|~1~|~01/NFA~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~049BE1C2CF5EFE98D2D363F79A45AB7319EFF139 98036~|~1~|~1~|~01/NFA~|~Adding Construction Contract subphase~|~01 - New Construction~|~340BFC39E51F7EA0474BDD7121830EC11D384CD2 100238~|~1~|~1~|~01/MPO~|~Repair and resurface Snow Road using MPO STP funds with 80% federal participation with 20% local matching funds.~|~05 - 4R Maintenance - Resurfacing~|~63985D4B43365159325559DD0FDF3BBDA73EA8C8 122899~|~1~|~1~|~01/ENH/NFAL~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~D5DE77223DB2CB67ACE881CBFDA059B0CB0B41C7 106981~|~1~|~1~|~01/SAF~|~Install left-turn lanes in both directions on US 22 at Zoar Rd~|~21 - Safety~|~D2CC96CA1104FC4DAE2C1D729009ACDF29C6164C 106981~|~1~|~2~|~02/NFP~|~Plan split for Greater Cincinnati Water Work installation of water line through the project limits as part of this construction contract.~|~43 - Utilities~|~6D2C322A53464893472EF406863E93F5010D5077 106981~|~1~|~3~|~03/NFP~|~Plan split for Warren County Water & Sewer installation of water line through the project limits as part of this construction contract.~|~43 - Utilities~|~4593F592FE2312800DDB4F2827ACD6B199A0AAB2 101844~|~1~|~1~|~01/SAE~|~Upgrade crosswalks, install countdown signals and RRFB's at various locations in 11 jurisdictions in Franklin, Delaware, and Fairfield counties~|~21 - Safety~|~E256DEB2C3FED25BE69A55A346AEA002139B32B2 105705~|~1~|~2~|~02/SAF~|~School flashers for Solomon Lutheran; Abbreviated safety Application D02-2020-06~|~21 - Safety~|~B91D69C0123CF812BD02A78C2AAD91437FF0EE8A 105705~|~1~|~1~|~01/SAF~|~Plan split for WOO-795-2.39 traffic signal~|~21 - Safety~|~B632B53158D8B3A0BA4992367611307F952A1F42 107630~|~1~|~1~|~01/IMS~|~Replacement of existing pavement and misc items (68%)~|~04 - Reconstruction - No Added Capacity~|~ADD5437CE6247ABCB0E7F93BC8A279426B82643A 107630~|~1~|~2~|~02/IMS~|~Pavement and misc items associated with Pavement widening (32%)~|~03 - Reconstruction - Added Capacity~|~79463671FF386B9CD6E11E528B11A0AD1742A36B 107630~|~1~|~3~|~03/IMS~|~Items associated with the removal and replacement of existing bridges (68%)~|~10 - Bridge Replacement~|~599FE2AFDBA7103DA8E580FC25D10E027762D02F 107630~|~1~|~4~|~04/IMS~|~Bridge work associated with bridge widening (32%)~|~10 - Bridge Replacement~|~F99818964F52DDCB009CA3357A7669FE5910DDBA 107630~|~1~|~5~|~05/IMS~|~Items associated with Bridge Rehab on SFNs 4901959, 4903455, 4903544, 6501869 and 6501893 ~|~13 - Bridge Rehabilitation~|~39A962895A9065D636F08667DACCCA6D970DFFD0 107630~|~2~|~6~|~06/IMS~|~Replacement of existing pavement and miscellaneous items (69%)~|~04 - Reconstruction - No Added Capacity~|~9BD57ECEBF899F75B9072555F8F20CAEFE175A6F 107630~|~2~|~7~|~07/IMS~|~Pavement and Misc Items associated with pavement widening (31%)~|~03 - Reconstruction - Added Capacity~|~219523C120C0A1B60589159C62391036AB23FCB2 107630~|~2~|~8~|~08/IMS~|~Items associated with the removal and replacement of existing bridges (69%)~|~10 - Bridge Replacement~|~0C39673E9BC07CE09A1364CB18A7CC245E16D4A1 107630~|~2~|~9~|~09/IMS~|~Items associated with widening of bridges (31%)~|~10 - Bridge Replacement~|~22A80368FF2112D12DBCFC818973DD9739FFCAFB 107630~|~2~|~10~|~10/IMS~|~Items associated with Bridge Rehab on SFN 4903218 (MAD-71-4.708)~|~13 - Bridge Rehabilitation~|~FFEDCA1374ED3D856832BBD8BAB6C29D6E512B72 122274~|~1~|~1~|~01/BRF~|~rehabilitate bridge SFN 1432788 over Anderson Fork~|~13 - Bridge Rehabilitation~|~AFDB7F1816E175322D6FB16E85F95D08A1290415 125573~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~C74C004DCA9942EECB1178EC0EE3A0285DC67D4A 107169~|~1~|~1~|~01/BRF~|~Plan Split~|~10 - Bridge Replacement~|~512938A9E9D52580A402107A0BBEAE0AE612F15D 127146~|~1~|~1~|~01/ENH~|~Trail construction/re-establishment and repair. ~|~28 - Facilities for Pedestrians & Bicycles~|~CDB557CF0C7B385E0E3C8A366552EB7120DA3652 109384~|~1~|~2~|~02/NFA~|~Resurfacing and widening of Warrior Drive, WAS CR 804 0.00-1.10, from Drive 1 to Mary Avenue. Includes pavement markings, curb ramps, drainage and signing. Funded 100% Local.~|~01 - New Construction~|~0E17D7E422890B29048EE07A534ADC4BAF6C877A 109384~|~1~|~3~|~03/NFA~|~Construction of a proposed township road coming off of SR 339 just south of the existing school property. Work also includes the rehabilitation of three existing school drives with full depth pavement removal/replacement at the entrance of the drives. Funded 100% Local, Warren Schools.~|~01 - New Construction~|~ADD69FB9E9411FB9A6A31BA5DE4754897FA252E0 109384~|~1~|~1~|~01/STR~|~Add turn lane for new school entrance at Warren Local location WAS SR 339 7.51-7.55.~|~01 - New Construction~|~0493DE629279DE865CE40E90BDFFC143E6CF139D 108835~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT CR 231 0.62 (SFN: 0933597).~|~10 - Bridge Replacement~|~D68CD8E2CD742D391E705D0F069988A5D427E622 80694~|~1~|~1~|~01/IMS~|~This split is for capacity addition for Angola Rd Bridges (80/20).4807537 LUC IR475 5.47 Intersect: Cr 32 Angola Road 4807561 LUC IR475 5.47 Intersect: Cr 32 Angola Road~|~13 - Bridge Rehabilitation~|~7653F818F7B1278C28ABDB5C126100DA2A59807A 80694~|~1~|~5~|~05/IMS~|~This split is for rehab of bridge over Wolf Creek SFN 4807383 as requested bt Kathy Wald. (90/10)~|~13 - Bridge Rehabilitation~|~83B2ABBA2D5474B059E08F2820A657FFAC1AAC7A 80694~|~1~|~3~|~03/BRO~|~4807472 LUC IR475 5.22 Intersect: Norfolk Southern R.R. 4807502 LUC IR475 5.22 Intersect: Norfolk Southern R.R.~|~10 - Bridge Replacement~|~BFA9A7C411956F0C8D67419A93A7075D802CD17B 80694~|~1~|~4~|~04/IMS~|~4807383 Bridge over Wolf Creek. Adding Capacity (80/20)~|~13 - Bridge Rehabilitation~|~F8DA7F19082C03DBF1AB3A175842984CFE5F82EC 80694~|~1~|~2~|~02/IMS~|~This split is for rehab of Angola Rd Bridges: 4807537 and 4807561. This is for Rehab (90/10).~|~13 - Bridge Rehabilitation~|~FDA7D0FE3A69C8C13E6D87B3A0B3476655E072DB 99652~|~1~|~1~|~01/STR~|~Split for resurfacing work funded with 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~3BB26C70BB1F591DA7F388129FB9EDF679279446 99652~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~E9626688FCC1CF0A0645CAB6454C170E3CCFB9D2 88774~|~1~|~1~|~01/BRO~|~Replace entire bridge due to deteriorated substructure with minimal approach work on SFN 0600091 AUG 29 5658 over the East branch of Clear Creek~|~10 - Bridge Replacement~|~C2FA2061B926BC09E7A37465919E93B1261807E1 110712~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E0AB9AED4E1204C8E7BC40C5CEBB6AD5463ABF02 110712~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~E18D9FA09A3DC9A7979522AF440351B9FF3C1703 103414~|~1~|~1~|~01/NFP~|~Plan split~|~44 - Other~|~69CAF570966FE6A0728A05586A9570E774F8D8D1 111633~|~1~|~1~|~01/NFP~|~Districtwide fence repairs and replacement.~|~44 - Other~|~1BAF156891875C0B23F1E4D52CD93010E3C4B478 115373~|~1~|~1~|~01/NFP~|~Split for the bridge work~|~04 - Reconstruction - No Added Capacity~|~AB89042BB3F09267BA4925A2FE7FAED39F7E3D04 121539~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~5C5A2704F57C7387513420A0A40EDFE535BBA801 95428~|~1~|~1~|~01/NFA~|~Facilities money 4MA7~|~~|~FB3A47791629A3F40CD0F4AB262C2EC190FED49B 77628~|~1~|~7~|~07/IMS~|~This plan split includes all work associated with the constructing the Duke conduit on the Lincoln bridge over IR-71 (HAM-71-0367, SFN 3114392).~|~43 - Utilities~|~2360390FAE1633B2CBBEC8B498FF52446D815669 77628~|~1~|~6~|~06/S>2~|~This plan split includes all work associated with the traffic signal at Gilbert & Buena Vista, which shall be funded with 100% local dollars.~|~04 - Reconstruction - No Added Capacity~|~28F8EB843C38511C693F83916877B95FBE4091E6 77628~|~1~|~4~|~04/S>2~|~This plan split represents all bridge work associated with the bridges not on the interstate. The only bridge in this plan split is the pedestrian bridge east of the IR-71 bridge over Victory, which is designated as Bridge No. HAM VCTRY 3691.~|~13 - Bridge Rehabilitation~|~3BCBF9308C4AC3A35F427344C16B4017E7EA8D08 77628~|~1~|~2~|~02/IMS~|~This plan split represents all mainline, ramp, and interstate bridge work associated with the project. Bridges within the project limit are as follows: HAM-71-0320 McMillan over IR-71 (SFN 3114260), HAM-71-0322 NB IR-71 Entrance from McMillan (SFN 3114295), HAM-71-0322 William Howard Taft over IR-71 (SFN 3114325), HAM-71-0344 Oak over IR-71 (SFN 3114368), HAM-71-0367 Lincoln over IR-71 (SFN 3114392), HAM-71-0381 MLK over IR-71 (SFN 3114422), HAM-71-0392 Abandoned RR bridge over IR-71 to be removed (SFN 3114457), HAM-71-0396 New Bridge Stanton over IR-71 (SFN 3114465), HAM-71-0403 Fredonia over IR-71 to be removed (SFN 3114481), HAM-71-0427 Blair over IR-71 (SFN 3114538), HAM-71-0450 IR-71 over Victory (SFN 3114562).~|~13 - Bridge Rehabilitation~|~86AD9967C344BA3E90C3CCA30815EAE0E03472A1 77628~|~1~|~3~|~03/NHS~|~This plan split includes work on the following NHS routes: HAM-US-22 (Gilbert), HAM-US-42 (Reading), HAM-CR-605 (McMillan), HAM-CR-606 (William Howard Taft), and HAM CR-612 (MLK). Activities covered in this plan split include but is not limited to all earthwork, barrier, pavement, landscaping, curb, drainage, lighting, traffic surveillance, signs, pavement markings, Geotechnical work, retaining walls, MOT, Environmental, and incidental work associated with these locations. Traffic signals at MLK & Reading, MLK & Gilbert, MLK & Harvey/Vernon, Reading & University/Lincoln, Reading & Whittier, and Gilbert & Lincoln. Traffic signal interconnect is also included in this pay item.~|~03 - Reconstruction - Added Capacity~|~8D236119538820AA410C7E6BD7EC155A584683B3 77628~|~1~|~1~|~01/IMS~|~This plan split includes all work on interstate mainline and ramps. Mainline work extends from south of William Howard Taft to north of Victory. Existing ramps are Ramp F (NB IR-71 entrance from MLK) and Ramp TH (SB IR-71 exit to William Howard Taft). Proposed Ramps are Ramp A (NB IR-71 exit to MLK), Ramp B (NB IR-71 entrance from MLK), Ramp C (SB IR-71 exit to MLK), Ramp D (SB IR-71 entrance from MLK), and Ramp E (new portion of SB Exit to William Howard Taft). Activities covered in this plan split include but is not limited to all earthwork, barrier, pavement, landscaping, curb, drainage, lighting, traffic surveillance, signs, pavement markings, Geotechnical work, retaining walls, MOT, Environmental, and incidental work associated with these locations. This work also includes the MSD detention facility. Traffic signals at MLK & Ramps A/B, MLK & Ramps C/D, and McMillan & Ramp F.~|~03 - Reconstruction - Added Capacity~|~B448AD8331EF7D333E4F92D5F69B54F33C8D9B80 77628~|~1~|~5~|~05/S>2~|~This plan split includes all work on non-NHS City roads, including but not limited to HAM-CR-663 (University/Lincoln), Whittier, Stanton leading up to the bridge, and the new connection between Van Buren and Borrman. Activities covered in this plan split include but is not limited to all earthwork, barrier, pavement, landscaping, curb, drainage, lighting, traffic surveillance, signs, pavement markings, Geotechnical work, retaining walls, MOT, Environmental, and incidental work associated with these locations.~|~03 - Reconstruction - Added Capacity~|~E6D8157690C86F750272B91EFB07761F9F9D30BB 77628~|~1~|~8~|~08/IMS~|~This plan split is for Bridge HAM-71-0381 (SFN 3114422) to rehabilitate Pier 5 using District Preservation funds. This split does not include widening or rehab work of this structure.~|~~|~A0F4BD5715DD9678AC87D6BDC7143CB47EB53C34 120692~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~7551BD46001BB475A44A0B77491FFDCA36E19034 104818~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~CE36A848282E0E2F6AD7EADFAA45B88FC3461FB2 104818~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~9E8C9B141A44FDE93BABACC98E61BA408BDFA9E1 104818~|~1~|~3~|~03/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~D4611096F863D032BA94639F18429C2B8756DFFA 104818~|~1~|~4~|~04/S<2~|~Construction Inspection.~|~17 - Construction Engineering~|~1DAE548525EF3E1D5152BF0F4984EC2CC84AA636 104818~|~1~|~5~|~05/S<2~|~Construction Inspection ~|~~|~7B7F79A33BCF0DBA3BBA119CC0754ECB71EF014C 112856~|~1~|~1~|~01/STR~|~FAY-22 from 10.98 to 17.62~|~05 - 4R Maintenance - Resurfacing~|~9E199F28AFEB59FE20D673AB985708E5A10BD359 112856~|~1~|~2~|~02/S<2~|~FAY-22 from 10.47 to 10.98~|~05 - 4R Maintenance - Resurfacing~|~D0F3880BCD8CF7318E5702EFAFB5451D33EDA6D0 117894~|~1~|~1~|~01/SAF~|~HOC SR 664 15.151 Safety~|~21 - Safety~|~9BF00B3B00C2FD000D5DDF85C71B1289756C18FA 121831~|~1~|~1~|~01/MPO~|~installation of one EV charging station in Mt. Washington Neighborhood business district~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~85E378E60BF0AD12331B51E2BC7C2E5A37BF74E0 104929~|~1~|~1~|~01/NFA~|~Wood County truck replacement project~|~44 - Other~|~3C8211EB2BF7668EB32E31B13ADF0DE4287465C2 98301~|~1~|~1~|~01/NFP~|~Guardrail repair on various routes~|~44 - Other~|~FAD7BC55DF4D6692CD63D275BB5E25D7658019FF 126489~|~1~|~1~|~01/NHS~|~Intersection improvements~|~21 - Safety~|~D6A17F9DE6F5E149BF799DA75BAAF292542CB800 124331~|~1~|~1~|~01/ENH~|~Sidewalk project~|~28 - Facilities for Pedestrians & Bicycles~|~6CBFDF351691EB854F6B27A3A9ED133A2AF22C11 93866~|~1~|~1~|~01/BRO~|~Project will replace the 1950 cast-in-place reinforced concrete beam bridge deck (middle portion). SFN 3136221. 1965 widened deck will remain in place as existing. Project includes repairs to substructure including concrete abutments. All work to take place within existing right of way. Structure carries Galbraith Road (CR-101) over the West Fork of Mill Creek.~|~13 - Bridge Rehabilitation~|~09E03EFA5ACDB731DCA556BE5AD3347DF80EB6FB 96380~|~1~|~1~|~01/IMS~|~test~|~~|~E64D8A485D6ED094C7FAF8ABA85BA6B6D43591AF 96380~|~1~|~2~|~02/MPO~|~test~|~~|~EB48F43AEA8A3FCB0C7F8257FFBA52A08C2CD6C8 107818~|~1~|~1~|~01/STR~|~MAR-47-2.09 to 2.45 MAR-203-0.43 to 1.19 MAR-257-0.35 to 0.65~|~05 - 4R Maintenance - Resurfacing~|~2621F6283B53BC8F0EF5E04B62FE343DCA35CCAD 107818~|~1~|~2~|~02/STR~|~Bridges on MAR-47-2.09 to 2.95. SFNs: 5102278~|~47 - Bridge Preventive Maintenance~|~AFD79AF95DBCA0DE39E6A6317099C841E3E9684A 124675~|~1~|~1~|~01/SAF~|~80% CEAO, 20% local for roundabout construction only~|~03 - Reconstruction - Added Capacity~|~782D66D279510777EE57576E2E30C749BB02F6B3 91653~|~1~|~1~|~01/NHS~|~Consultant CE contracts~|~17 - Construction Engineering~|~221E93B02A0F8439695EBC7AC2135A0CA8C0898C 119643~|~1~|~1~|~01/NHS~|~Roadway reconstruction work along US 30.~|~04 - Reconstruction - No Added Capacity~|~687FA2EC2D3FE38029CED3141A8D9EFFA7DAB5BF 110935~|~1~|~1~|~01/S>2~|~Resurfacing work on the Urban STP system SLM 5.10 to 5.82 (SCL to Pleasant Valley)~|~~|~D08A335321793288D3E7D902E347D8E394E36F6B 110935~|~1~|~2~|~02/NHS~|~Resurfacing work on the NHS system, SLM 5.82 to 7.86 (Pleasant Valley to Ridgewood)~|~~|~B4E9BB569817F470CF9B3056FA8D96B8C664B055 110935~|~1~|~3~|~03/NFP~|~Plan split for non-eligible work items.~|~~|~7D1C01D25CA92ED37D640C34D369FA589E6B52A5 97836~|~1~|~4~|~04/BRF~|~Replace 1239503 CLA 350-0459 Moorefield Road over Buck Creek~|~10 - Bridge Replacement~|~62D0DF73D5A6ABBD85382C3C74C48305DC4B6DD5 97836~|~1~|~2~|~02/BRF~|~Replace SFN 5769019 MOT 43-0080 Old Mill Road over Pigeye Creek~|~10 - Bridge Replacement~|~9933903D3A766F70B104B07ADDC7D603DCC5BFB2 97836~|~1~|~1~|~01/BRF~|~Replace SFN 5531179 MIA CR 21-0632 N Casstown/Sidney Rd over Lost Creek~|~10 - Bridge Replacement~|~A4FABDD481D53329F2A6BA7FDE64458DB817AAE6 97836~|~1~|~3~|~03/NFA~|~Reaplce SFN 5767644 MOT MO 163-105 S. Gebhart Road over Sycamore Creek~|~10 - Bridge Replacement~|~D7AA9DB3C65222F61D6FD14D0661DDAB8D8EB696 110864~|~1~|~1~|~01/SAF~|~District 5 Safety Funds - 4HJ7 (90% Federal) / 4BC7 (20% State) - See CAP Comment - Project to replace Type A end treatments along NHS routes in municipalities in Licking and Knox Counties.~|~21 - Safety~|~B4C0E9AAFE45009FA0E885923201E9A1134CE824 101024~|~1~|~1~|~01/SAF~|~District Wide project for various striping and RPM work. Actual locations to be determined.~|~21 - Safety~|~A1E029DA6A0C430D9BBECB97A2BA3F875503FE28 95631~|~1~|~1~|~01/ENH~|~Enhance the transit, pedestrian and bicycle facilities along Cedar Glen Parkway - Cedar Road in Cleveland Heights using 80% federal (MPO Enhancement) with 20% local matching funds.~|~17 - Construction Engineering~|~24AB188AA9C470A6EAF646DC5B166160BF0C1F1A 113727~|~1~|~1~|~01/SAF~|~Construct sidewalks from Powell to Highland in Columbus.~|~21 - Safety~|~57191F06F5D26619C24470F80B49FC5A95D3C2B1 113044~|~1~|~1~|~01/STR~|~All work in this split.~|~05 - 4R Maintenance - Resurfacing~|~5B8FC84BCFB11B04D3AA4A3154B335356C5CD69A 88621~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete AUG-SR-197 7.440 to 16.030~|~05 - 4R Maintenance - Resurfacing~|~5542C21963D8C7207452EB755C0839225E4B269E 88621~|~1~|~2~|~02/NFA~|~Resurface the existing roadway with asphalt concrete AUG-SR-116 7.240 to 11.080~|~05 - 4R Maintenance - Resurfacing~|~C7BBBDBDA4BE7CC376C863AA90DAC9B24FBDE91C 112679~|~1~|~1~|~01/IMS~|~Epoxy overlay of FRA-70 over Nelson Ave. & NS RR.~|~13 - Bridge Rehabilitation~|~2B9E4731600E3FFC304A5870CA18232FF49797E3 102050~|~1~|~1~|~01/IMS~|~Work on three structures within existing deck width~|~13 - Bridge Rehabilitation~|~ADC711F83EB216BCA3EE8F574CAD205A7E3E5650 102050~|~1~|~2~|~02/NHS~|~Work on widened section of three structures~|~17 - Construction Engineering~|~5D25E7A8DDF4EF40389D651B2A0B323384E99DFA 102050~|~1~|~3~|~03/BRO~|~Work within existing bridge width. Eligible for BR funding at 90/10~|~17 - Construction Engineering~|~EAB624E0969BF9D47AED46EA919C2A4D0AE7012C 102050~|~1~|~4~|~04/BRO~|~Work to widen structure. Eligible for BR funding at 80/20~|~17 - Construction Engineering~|~9E260FEC8A856C9AE098C4D9427510395D055820 123785~|~1~|~1~|~01/IMS~|~Plan Split for interstate resurfacing at 90/10~|~05 - 4R Maintenance - Resurfacing~|~FCECAA7CC437A349EC3D8A0E7DE488A304844B1B 121273~|~1~|~1~|~01/STR~|~All Work Within this Split~|~13 - Bridge Rehabilitation~|~AE5DA8D035E3DA72B745856CB32809F92CAEB67A 83624~|~1~|~1~|~01/S>2~|~80/20 funding split for federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~33446E29587458729DA4859CB406F99760E6AEB4 123722~|~1~|~1~|~01/IMS~|~Replace culvert type bridge carrying Aults Run under IR 70 via tunnel liner plate.~|~04 - Reconstruction - No Added Capacity~|~4FB633C92D068432DF5E070D43A77705C5FE161C 111030~|~1~|~1~|~01/SAF~|~Repair landslide along Columbia Pkwy.~|~21 - Safety~|~C1E9AC1CE4A4C04EE11B8A6620AF29E077EA38E9 124723~|~1~|~1~|~01/ENH~|~Shared use path utilizing 100% Federal funds (TAP and Safety) up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~2A60C1C90EC8B31B105484B419B97EC454729ECE 116624~|~1~|~1~|~01/NFA~|~Lighting Project.~|~21 - Safety~|~9093CACCE80E42C8DB9735FC1AA39AE1A39DF77D 116624~|~1~|~2~|~02/NHS~|~Relocation/Removal of signal equipment. ~|~~|~658FF61029C009CE151C404948C47BC019D20F9F 114395~|~1~|~1~|~01/S>2~|~Plan Split 01/S>2/PV/ " - 80% Federal 20% State~|~05 - 4R Maintenance - Resurfacing~|~141F6DF2D5E3E411E46CA9E5B5FC73228D20449F 114395~|~1~|~2~|~02/S>2/PICK~|~Plan Split 02/S>2/PV/PICK~|~05 - 4R Maintenance - Resurfacing~|~1842795C93EED067E65B46CF593A3739FA90D5F7 114395~|~1~|~3~|~03/STR~|~Plan Split 03/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~26CC185A17F612431153E6F1F31115E66067C9EB 121104~|~1~|~1~|~01/BRF~|~Primary plan split for Bridge Exchange funds~|~10 - Bridge Replacement~|~F7EE0106C936176B3203A016CB41478BA94A0F1C 87690~|~1~|~1~|~01/NHS~|~RIC SR 13 - 11.01 to 14.40 Asphalt Concrete Repairs Full and Partial Depth.~|~05 - 4R Maintenance - Resurfacing~|~7C4107A248C27DA79BA7F15261DC0D294AA04A5D 97497~|~1~|~1~|~01/BRF~|~100% Federal participation on the bridge replacement ofr SFNs 1868292 and 1867857 using OBP funds.~|~10 - Bridge Replacement~|~9AAE596CF921B8CD3A31EAB7F96DE923B6575AF7 90878~|~1~|~1~|~01/STR~|~Bridge Replacement (< 20' length): CRA-294-4.10 (SFN 1703579)~|~10 - Bridge Replacement~|~F161BA94D1811457993480D0E402608042F10839 104261~|~1~|~1~|~01/NFP~|~MOWING~|~44 - Other~|~BE396BEEC3C2AF377DC31B1D587BCF57F14BB0A5 115130~|~1~|~1~|~01/SAF~|~Construct a roundabout at the intersection of SR 61 and SR 229 including the necessary bridge and culvert modifications~|~04 - Reconstruction - No Added Capacity~|~20C33952B48AB08C8E8392A3D65CFDE8D9B67075 126727~|~1~|~1~|~01/S5K~|~ATH-682-0.04 Deck Replacement~|~10 - Bridge Replacement~|~629C5E85629ADF334A9ECD4DBEBC7ECBE50E1B37 110866~|~1~|~1~|~01/SAF~|~Added Safety Plan split~|~~|~6EEE2922AF8AA2CF7E574E0B5E06A4C53D3C825E 101278~|~1~|~2~|~02/NFP~|~SEN-635~|~~|~B24B0052D87010C2213699110F420AC3C21E4EE9 101278~|~1~|~1~|~01/STR~|~WIL-34, WOO-199, WOO-235~|~17 - Construction Engineering~|~253AA78D397E4E6F80CE5942E414FACF29FF2BDE 87191~|~1~|~1~|~01/STR~|~Work on SR 15 in Defiance County outside the Defiance Urban Area, which is SR 15 from 0.00 to 13.07 and 21.65 to 22.33. Also includes all work on SR 111 and 637 in Paulding County that is part of this project.~|~05 - 4R Maintenance - Resurfacing~|~42370FC6E6D3B871DFA4F9602BF5B03E09301AB8 87191~|~1~|~2~|~02/S<2~|~This split is for work inside of the Defaince Urban Area which is SR 15 from 13.07 to 13.35. Although, inside the Defaince Urban area, the work is outside of the City of Defiance. Therefore, there are no local funds in this event. All funds are from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~78B8DC47E813B383498DDF83FEE4C070171053CA 121668~|~1~|~1~|~01/STR~|~Replace deck and repair scour.~|~13 - Bridge Rehabilitation~|~4AE9F2D1AD73851006A0E337532B460D286B89CF 98999~|~1~|~1~|~01/S>2~|~Kilburn~|~01 - New Construction~|~715721B740B2D4A2BBEBEA80B72AACE2ADAC196F 98999~|~1~|~2~|~02/NFP~|~100 County funds~|~~|~C1A5B1506AA1BAAF2086446BC24F498DF6C13BC2 105658~|~1~|~1~|~01/S>2~|~Plan Split for Winchester Pike over US 33 in Columbus~|~10 - Bridge Replacement~|~1ADC5F4D8542590A8CFBDFD8F5E2CC829A6C4CDB 93735~|~1~|~1~|~01/SAF~|~Installing pedestrian signal heads, pedestal poles, conduit, wire, and pull boxes at four intersections within the Village of Versailles. Pavement, sidewalk, curb ramp, and pavement marking restoration will be included. Locations are from the End radius on all 4 corners of each of four intersections: Main and West, Main & Center, Center & Wood, and Center & Ward.~|~~|~123BD4C240EE167BA1B1D8CCF6FDE6F18913E43B 114509~|~1~|~1~|~01/S>2~|~plan split for resurfacing the large urban sections on BUT SR 747~|~05 - 4R Maintenance - Resurfacing~|~F5FA24A4E1B9BFCEFF3E8A2B09F841FB73463884 98257~|~1~|~1~|~01/NFP~|~WIL-SR49-15.00~|~03 - Reconstruction - Added Capacity~|~C4181297DAAD54059F8F96CA91B675A88661AE72 110720~|~1~|~1~|~01/IMS~|~Using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~0182DD36ABE3517EBBFE462CDFB5D1F24553D6AC 126606~|~1~|~1~|~01/MPO/CAMP~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B4B3D207E930D3616DFFAFC89D0992960D8B5A4B 118520~|~1~|~1~|~01/BRO~|~The project length is approximately 800?, from the end of the 2017 Stimson roundabout project (PID 103157) to CR 25 (Rock Riffle Road). To extend the life of the bridge and defer a complete structure replacement for decades.~|~13 - Bridge Rehabilitation~|~81311F3AE668348B9ACC45A8163C74E9B9CD4CCF 100833~|~1~|~2~|~02/S>2~|~Rehab HAM-50-2138R bridge (SFN 3103307) that carries a ramp from 2nd street to US 50 over Broadway by filling voids in Post-tensioned bridges with grout.~|~13 - Bridge Rehabilitation~|~A5D9E6AEFA7AD62D0B1B746CFB48FCC4AE19131E 100833~|~1~|~1~|~01/IMS~|~Rehab bridges by grouting the voids found in the tendon cavities for the bridges carrying the interstate or ramps to the interstate.~|~13 - Bridge Rehabilitation~|~C0A9A35715C61C1C87A132AEA1285E0908B87AD3 88310~|~1~|~1~|~01/IMS~|~Reconst no added capacity - pvmt workAlso retaining walls 1, 2A, 2B, 2C, 3, 4, 5~|~04 - Reconstruction - No Added Capacity~|~585C6E1B74D91DBD9F8266317D31060BFA195598 88310~|~1~|~2~|~02/IMS~|~Construct 6 new bridges and retaining wall 6SFN 2510316 FRA-270-17.16 B1 - Ramp WN over 270SFN 2501155 FRA-33-2.71L B3 L - 33 WB over new ramps WN & ESSFN 2501163 FRA-33-2.71R B3 R - 33 EB over new ramps WN & ESSFN 2510308 FRA-270-17.14 B5 - Ramp ES over 270SFN 2510340 FRA-270-17.61 B6 - Ramp NW1 over S Fork Indian RunSFN 2510405 FRA-270-17.63 B7- Ramp EN over S Fork Indian Run~|~08 - Bridge - New Construction~|~6F4DD07D918F67A0336A7FB4BBF2BF7ED58E8067 88310~|~1~|~6~|~06/IMS~|~Charges to ATT&T for delays~|~04 - Reconstruction - No Added Capacity~|~4DAE479B9DB2F71ED061F67094966D02EAAED3AD 88310~|~1~|~7~|~07/IMS~|~Repair of damaged attentuators~|~04 - Reconstruction - No Added Capacity~|~87F896DA6650C5706055D9BF28CA2F7F8746DA73 88310~|~1~|~8~|~08/IMS~|~Repair due to fire on bridge~|~13 - Bridge Rehabilitation~|~BF9F478C880AD55D8DF2894F9A8A4F3800415280 88310~|~1~|~9~|~09/NHS~|~Installation of fiber optic cable~|~04 - Reconstruction - No Added Capacity~|~81B8E6692E5E6057DD2D47D87154516A24AC74AB 88310~|~1~|~3~|~03/IMS~|~Bridge Rehab no added capacity:SFN 2501112, FRA-33-2.57 L - 33 WB over 270SFN 2501147, FRA-33-2.57 R- 33 EB over 270SFN 2510294, FRA-270-16.73 270 SB over Cosgray DitchSFN 2510200, FRA-270-16.19L 270 SB over Cramer DitchSFN 2510413, FRA-270-18.23L 270 SB over N Fork Indian Run~|~13 - Bridge Rehabilitation~|~A739FAB19146F14C8B27D30EC92CA421C54F60BF 88310~|~1~|~4~|~04/IMS~|~Project eligible utility items - water and sanitary~|~43 - Utilities~|~CE1F1F8A4DB9FE4606D0AA78A6A6BF110FCFDF4D 88310~|~1~|~5~|~05/IMS/DUB~|~100% funded Dublin items:Paint guardrail in 33 median W of Post/Franz, paint overhead sign supportsLandscaping-seeding, perennials, trees, concrete grid between grassesfree standing limestone aesthetic walls, irrigation~|~31 - Landscaping & Other Scenic Beautification~|~F9A9EAF025705EE06DB326A473701E1E32FE399B 105488~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~BCBE6AB81DE2E245F1E6196A3323FB9459124BF3 84020~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~DAA8FD292AC9EF240AF952E8E2F7381E3F336561 84020~|~1~|~2~|~02/NFP~|~Split for 100% state items~|~05 - 4R Maintenance - Resurfacing~|~FFC3F8CD3CCF13F95A744AD99FBA9737768528C8 104745~|~1~|~1~|~01/IMS~|~plan split~|~47 - Bridge Preventive Maintenance~|~4CD68E16E8E08AA446D70EC34B724A402E5771C7 102061~|~1~|~1~|~01/SAF~|~This plan split if for signal upgrades at 51 locations in Hamilton County.~|~21 - Safety~|~796EFF80CBB2A86D82FE1588F30F3AA0CC1BB95C 98696~|~1~|~1~|~01/STR~|~Whitetopping HAS-151 with 4.5" bonded concrete overlay.~|~05 - 4R Maintenance - Resurfacing~|~597CE972445633BF2E87263ABF035F6453E19082 124422~|~1~|~1~|~01/NHS~|~Athens US 50-6.11R Bridge Replacement (SFN:0501476)~|~10 - Bridge Replacement~|~5FF7D7FB82563623466DEC0EB3754C9EEB807AF1 120250~|~1~|~1~|~01/SAF~|~Roundabout and pedestrian improvements on Roberts Rd at Frazell and Spindler ~|~21 - Safety~|~1E378254F7750C5030EA310D9732CAC5583E74D5 110516~|~1~|~1~|~01/BRO~|~Bridge funds Plan split~|~13 - Bridge Rehabilitation~|~6FE0074FE307E43E2B1F7353B37C20726C7DFAF0 122959~|~1~|~1~|~01/SAF~|~SAFETY ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DD098922267619AF8D9F87998BE929CDBF48AB77 114145~|~1~|~1~|~01/NFP~|~Dead ash tree removal on various routes in D9.~|~99 - State Preventative Maintenance~|~5D986ED0CD33EAD3A03F5E8650E991ADB9E3D48F 114201~|~1~|~1~|~01/NFA~|~Replace deficient bridge and increase vertical clearance over CSX railroad. The proposed bridge will be a 3-span prestressed concrete, adjacent box beam superstructure on reinforced concrete wall-type abutments and piers. Project to include necessary approach and intersection work to accommodate the increase in vertical profile for the clearance requirements over the CSX RR.~|~10 - Bridge Replacement~|~AD3A100848994F5CAE7089A718B4FBF98910CA80 101530~|~1~|~1~|~01/NFP~|~Two year construction inspection agreement.~|~17 - Construction Engineering~|~D16BE2042C604562ACE22D009F4971A34B00F128 110633~|~1~|~2~|~02/IMS~|~All work related to the Ohio bridge size culvert HAM-275-0158 (which is less than 20 feet and therefore not a federal size bridge).~|~04 - Reconstruction - No Added Capacity~|~9599ADE29492B37E259D165CA8F0DF4D41BA4BE4 110633~|~1~|~1~|~01/S>2~|~Rehab bridge size HAM-50 culvert by paving the invert with concrete. Line the adjacent small culvert with a CIPP liner~|~04 - Reconstruction - No Added Capacity~|~81D79DA16A7F893BEF4D3556E5734D33E53E7ACF 110633~|~1~|~3~|~03/IMS~|~Work associated with Bridge Size culvert HAM-75-1710 repair~|~13 - Bridge Rehabilitation~|~BBFF9BDCA10549879A5F2FC2B3584B3F236C3D95 124692~|~1~|~1~|~01/BRO~|~Bridge deck replacement.~|~13 - Bridge Rehabilitation~|~6E93EAEEB9105FA0BD648E324BB5D29B5F646006 93485~|~1~|~2~|~02/S>2~|~Bridge brackets for holding Dominion East Ohio Gas Line.~|~43 - Utilities~|~D1108FBD9A7B032FCFFE4C28D9126A9382F1D1CF 93485~|~1~|~1~|~01/BRO~|~Deck replacement of the linked structure > 20' span.~|~10 - Bridge Replacement~|~84EDBF6EF03FB01E6337CB03479C9C7EE5326D32 93485~|~2~|~3~|~03/S>2~|~Resurfacing TRU SR 534 from4.02 to 5.23 some within the Village of Newton Falls.~|~05 - 4R Maintenance - Resurfacing~|~E75929AFE248EC06B65644B53211169109BD9F7B 121343~|~1~|~1~|~01/NFA~|~TSMO~|~44 - Other~|~796627FB6CD246D58A7AEDFB57C5FBD56D2D9672 112589~|~1~|~1~|~01/IMS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work.~|~47 - Bridge Preventive Maintenance~|~3AC96F3631B4EB557F7875F7DD7452629F862C03 92161~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for guardrail ding and dent repairs for one year.~|~21 - Safety~|~56CC8F6C53FD510DA9B09269CF8A0536711949EB 100796~|~1~|~1~|~01/NFP~|~Emergency repair of damage due to truck accident and fire~|~13 - Bridge Rehabilitation~|~050F4D84637D21ACCDDACA696F434B3BF327909F 116167~|~1~|~1~|~01/SAF~|~Pavement marking project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~53F93BA9451F3B02BCC19D194FB32248115FEFD8 96029~|~1~|~2~|~02/IMS~|~New bridge for ramp SW~|~08 - Bridge - New Construction~|~E7A0595EDA1312C4789481C860F4C82E9E8CD3B3 96029~|~1~|~1~|~01/IMS~|~Roadway work~|~04 - Reconstruction - No Added Capacity~|~FABE644FC1037D67A02335A4BC950DC17ECA5F29 120385~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~BD9329F8329114C908404150B98EEACF63330528 90903~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~4209F312DDC514EAB6E2E3CB50D2CB12028F56AE 84681~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District budget SAC 4MP7.~|~21 - Safety~|~A536C55507BCB1144EB26A2550B8EC4FF47AC18C 117167~|~1~|~1~|~01/IMS~|~This plan split includes all anticipated work at this time. The splits will need to be updated before scoping.~|~03 - Reconstruction - Added Capacity~|~4560C2ACB54BF666825013386272D40FF7FED0DA 103643~|~1~|~1~|~01/S<2~|~DSR BEL-016~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~21E39C0DA9905B33ED88D095FAB927EE28936D32 103643~|~2~|~2~|~02/S<2~|~DSR BEL-017~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CEF4964DAB7E70DA33AB3DA14DE86D62002CB117 103643~|~3~|~3~|~03/S<2~|~DSR BEL-018~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C8E71E923538F654C7B4A5F8104A180EBAD46258 103643~|~4~|~4~|~04/S<2~|~DSR BEL-018, ER Event OH18-01~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4A28E79BBC1E100BE38578D67A77D17ADB7973B1 95668~|~1~|~1~|~01/CMQ~|~Improve intersection of Coy/Dustin.~|~04 - Reconstruction - No Added Capacity~|~F578D7A280F1D91DB26FB04D483F26AE3726F889 94170~|~1~|~1~|~01/BRO~|~Replace existing deck with new composite reinforced concrete deck for bridge BEL-7-2361 (SFN 0700770). New aproach slabs will be provided. The substructure units will be repaired as needed.~|~13 - Bridge Rehabilitation~|~8A2016D6B0829D61A2F5A7C520E3E3A0FDA01FCF 125659~|~1~|~1~|~01/NHS~|~Plan split for resurfacing on the NHS section~|~05 - 4R Maintenance - Resurfacing~|~552E0674FD7C167B0C5558D751F9D49F3C61059A 125659~|~1~|~2~|~02/S5K~|~Plan split for the resurfacing on the small urban section~|~05 - 4R Maintenance - Resurfacing~|~05554617D54A01674BA0E748B9ADE02E015A1A17 125659~|~1~|~3~|~03/STR~|~Plan split for the resurfacing on the rural section~|~05 - 4R Maintenance - Resurfacing~|~697250CC0723FE12A6DD20ED12783AAE52FFD332 103819~|~1~|~1~|~01/STR~|~Bridge repair on rural route.~|~13 - Bridge Rehabilitation~|~C50FE844BB58E299CF8766305181594F00329689 103819~|~1~|~2~|~02/NFA~|~Bridge repair on non-Federal route.~|~13 - Bridge Rehabilitation~|~3A41294032AD1FF9D6B24B6D04D5E658EF18B918 92166~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance Funds for one year Gaurdrail Ding and Dent Repairs contract~|~21 - Safety~|~F388B470F7A1A3DFC88B863565F980484D29AFCF 99611~|~1~|~1~|~01/BRO~|~Replace existing bridge COL 164 0980 (SFN 1503979) with new structure~|~10 - Bridge Replacement~|~9FD427F253D47A4E99FDF8F3DB4524FAC2B2E0ED 124355~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~5DD81E60EDF158B2E1FAB10C29AAFDF55D6A03AE 103977~|~1~|~1~|~01/STR~|~HIG 72 2.30 (SFN 3601455) bridge replacement.~|~10 - Bridge Replacement~|~A11D2C0D9F18046AEF26B438BC8E3418E82E71BC 93439~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Tallmadge Avenue from Home Avenue to Brittain Road, in the City of Akron.~|~21 - Safety~|~347775B42A9D101C02EB6056CF07A810127226FF 102401~|~1~|~1~|~01/STR~|~SR 9, 2.55 to 12.12~|~05 - 4R Maintenance - Resurfacing~|~BDF0D0BB9C2E9A147AC59EE88C8345E00537F3BE 102401~|~1~|~2~|~02/S<2~|~SR 9, 12.12 to 12.28~|~05 - 4R Maintenance - Resurfacing~|~5DBDF7DFE4B8600D10412B9BCB367F3ACB00BE7D 102401~|~1~|~3~|~03/NHS~|~SR 9 12.28 to 13.06~|~05 - 4R Maintenance - Resurfacing~|~2A64246C1437E3ED37190B1F599E7435E3C13A13 114369~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ "~|~05 - 4R Maintenance - Resurfacing~|~EB78970A2A082CEB26DACBE65B722ED42D2685E7 118273~|~1~|~1~|~01/SAF~|~Safety plan split for signal installation and left turn lane realignments~|~21 - Safety~|~E22D68A2068EC7FB5A88AAB7A361943CF21B1DEC 120096~|~1~|~1~|~01/SAF~|~Plan split for roundabout construction~|~21 - Safety~|~591422703DE454B932253F62FCC350CA5604078F 117949~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order.~|~21 - Safety~|~7330B7263FAAC720DC93B24C2982F42145B26B3A 120302~|~1~|~1~|~01/NHS~|~Clean and paint structural steel of bridge carrying US 22 over South Fork.~|~47 - Bridge Preventive Maintenance~|~EB507154E825D4FF70A7B7ADC01B524EB8E21329 87710~|~1~|~1~|~01/NHS~|~District Allocation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CD52C5C1A28B4E3786643C8ADFC29800BA865116 99052~|~1~|~1~|~01/NHS~|~Split for pavement work on SR-8~|~~|~794FE187E28AA8BE53C26810ED1E26DD09F73662 89397~|~1~|~1~|~01/ENH~|~This split is for work eligible for funding with Transportation Enhancement (TE) funds. The federal funds are from the ODOT Central Office controlled TE program.~|~31 - Landscaping & Other Scenic Beautification~|~49E14700D7079154E9D21299CD615D0C5355B697 89397~|~1~|~2~|~02/NFP~|~This split is for 100% city funded signal work that is not eligible for Transportation Enhancement (TE) funds.~|~21 - Safety~|~917FD6BEF3A5D8747E63A4B33A4502AAC7797AD7 86206~|~1~|~1~|~01/BRO~|~Replace box structure over Miller DitchSFN 2516446, FRA-317-11.90, Miller Ditch01/BRO/BR/~|~~|~40A4C076384854B084614928B8AE97D1F2C70262 105020~|~1~|~1~|~01/STR~|~Plan split~|~05 - 4R Maintenance - Resurfacing~|~75D8B92EC4202292AAA6931DF5082E7F3A5DF87B 109011~|~1~|~1~|~01/STR~|~Culvert replacement at CAR-542-4.21 and 4.27.~|~04 - Reconstruction - No Added Capacity~|~B6EEC8BFBF68ED6A0FB7F81310BC2D8D933116AF 109011~|~1~|~2~|~02/STR~|~Sanitary sewer replacement~|~04 - Reconstruction - No Added Capacity~|~8A854E5E15DA5590D24BC4004FA3311F2D7C83D1 108087~|~1~|~1~|~01/STR~|~Plan split for construction engineering services.~|~17 - Construction Engineering~|~C8E9C42304AF98AC6CCC80CE2024E0F03BB0448E 108087~|~1~|~2~|~02/STR~|~Plan split for construction engineering services.~|~17 - Construction Engineering~|~287D752552215A06B4328349EC03C8C2D6588A04 105454~|~1~|~1~|~01/STR~|~LOR SR 0082 5.13-10.06~|~05 - 4R Maintenance - Resurfacing~|~D9611DE60652BF47A0D03B09AB266EBB15CCEA68 121330~|~1~|~2~|~02/NHS~|~FRA US 33 and FRA SR 161~|~05 - 4R Maintenance - Resurfacing~|~B97EBF95D292652764A7C5AA8216BBFD724BF41C 121330~|~1~|~1~|~01/IMS~|~FRA IR 270 and FRA IR 670~|~05 - 4R Maintenance - Resurfacing~|~2D1D3BDA190B5724B8E6B4A55B3F3217573A4085 109489~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~5821514B16F0FC5F142E8408F73259CFA0E27D65 106704~|~1~|~1~|~01/BRF~|~Work to replace the bridge. Federal funds from CEAO budget with local funds from Hardin County.~|~10 - Bridge Replacement~|~F2607EA04AA51AC55D8A46D16107D243E373DF76 108103~|~1~|~1~|~01/S>2~|~Split for SR-87 paving~|~05 - 4R Maintenance - Resurfacing~|~616D4FCC8AF691D19DD5B15153D59BC632E7EEED 108552~|~1~|~1~|~01/STR~|~ER Event OH18-01. Landslide repair project. MOE 536 8.90-8.94. DSR MOE-023. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~97074C8BF7231FE15502AE9F5768538A93BE34BE 104495~|~1~|~1~|~01/NFA~|~TR-3~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~982B9088A3572D81D2C104898444344B242C4CE2 98304~|~1~|~1~|~01/SAF~|~Modify the existing roadway geometry and traffic signal at the intersection of US 62 & Glen Drive in the Village of Millersburg.~|~21 - Safety~|~40F9E2EC6B79C11FD6ACADAA46B87E6E102BE7DE 95550~|~1~|~1~|~01/STR~|~HIG 28 (7.27-15.35) Microsurface~|~05 - 4R Maintenance - Resurfacing~|~D707011F5C492A2C94783750AA09156B141127B0 95550~|~1~|~2~|~02/S<2~|~HIG 28 (15.35-15.43) MicrosurfaceHIG 41 (8.94-9.63) Double Microsurface~|~05 - 4R Maintenance - Resurfacing~|~EF9BA93EF4D446C04935B3925A5953BC2DFF5831 103914~|~1~|~1~|~01/NFP~|~Upgrade traffic signals at various locations~|~44 - Other~|~9B1969F270F4D93B463F33CA3F09772C2BD0ACCB 98530~|~1~|~1~|~01/NFP~|~Pavement markings work funded with 100% state funds from the District Preservation Program budget.~|~21 - Safety~|~7D12C3D65AF5D0113297690CFBEE9C55D18D7161 126396~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~E55E9EAFCBE340E7FEBB8616ECD5397C1241B949 126088~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~4221B1B5B56BFE45D01E8B4D4C41B4D84630548E 105099~|~1~|~1~|~01/STR~|~BRO 505 5.50 culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~DEAD3C71CD53875237A321E8F103E3353360ED7F 107847~|~1~|~1~|~01/STR~|~District preservation funds.~|~~|~26FE7039F0690BF57945D3F60D749934A7DC48AC 99236~|~1~|~1~|~01/SAE~|~Various County Roads.~|~21 - Safety~|~0A0F289CC19472FDBAE4FB131BED70396D7FEC2D 90947~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an asphalt inlay. HOC 33 9.48-14.69. 80/20% Federal/State.~|~05 - 4R Maintenance - Resurfacing~|~0D1C0945906745EBFC9B5A3550843E5DC7C82793 90947~|~1~|~2~|~02/STR~|~Four-lane resurfacing project using an asphalt inlay. HOC 328 11.26-11.41 ramps. 80/20% Federal/State.~|~05 - 4R Maintenance - Resurfacing~|~25553A343E2015B9DFDB79A1F54A17BAE4C4AAD3 82470~|~1~|~3~|~03/STR~|~Deck overlay with joint repair/replacement on SFNs 5503817-MIA-201-04.90, 5503841-MIA-201-06.11, 5503876-MIA-201-08.53~|~13 - Bridge Rehabilitation~|~45085F77945900D39CC180ED212EC6FFADE882A1 82470~|~1~|~1~|~01/STR~|~Resurface existing roadway with asphalt concrete (2 lane resurfacing) on MIA US 40 SLM 2.01 to 6.30 (Segment length 4.30) and MIA SR 201 SLM 4.30 to 9.31 (Segment Length 5.01 )~|~05 - 4R Maintenance - Resurfacing~|~A26CB2501BC4B0E369B3F6941D73DEB4B5E76B72 82470~|~1~|~2~|~02/S>2~|~Resurface existing roadway with asphalt concrete on MIA US 40 from SLM 0.00 to 2.00 segment length 2.00.~|~05 - 4R Maintenance - Resurfacing~|~E9FEC3A74BC149FE5170E4542BE2DD5A0DA47047 108098~|~1~|~1~|~01/MPO~|~Resurfacing Chestnut Blvd in the City of Cuyahoga Falls.~|~05 - 4R Maintenance - Resurfacing~|~A055101DDA05390AAC2F38EE17E2B46BEEA25DEE 104996~|~1~|~1~|~01/NFP~|~Restriping within District 5 (MUS, GUE, COS)~|~21 - Safety~|~A003733E9068BCB960B776DAF972D6C59D320515 102773~|~1~|~1~|~01/NHS~|~All work is in this split. Funding is 80% federal; and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~918D68C01201C1CB93FA6C9DA10A44895364794D 102773~|~1~|~2~|~02/NHS~|~Collision repair work on bridge hit on Krouse Road over US 24.~|~13 - Bridge Rehabilitation~|~A82988DFA4864B484DA07B05CFCCF4B638D21A9A 121444~|~1~|~1~|~01/NHS~|~Plan split for resurfacing SR-108 from SLM 8.008 to 13.385~|~05 - 4R Maintenance - Resurfacing~|~2844FBF42FD02E3A3D15FB290DC9971CE90E82A4 121444~|~1~|~2~|~02/STR~|~Plan split for resurfacing SR-66 & SR-108 from SLM 7.034 to 8.008 and SLM 16.387 to 19.381~|~05 - 4R Maintenance - Resurfacing~|~9ACD0A350904629D7A23B7A4FAF18259E6BDB5F0 121444~|~1~|~3~|~03/S5K~|~Plan split for resurfacing SR-108 from SLM 6.764 to 7.034~|~05 - 4R Maintenance - Resurfacing~|~2AF464AEE9637F7A421A1D9038B8F65CD4258A7D 108061~|~1~|~1~|~01/STR~|~All items associated with crack sealing on I-270.~|~05 - 4R Maintenance - Resurfacing~|~61956AA37D846F56BC4417A6F61D548B8F8B56BC 115338~|~1~|~1~|~01/MPO/RICH~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F0D55D47A946E446FA310E039CB56648765A4165 82573~|~1~|~1~|~01/CMQ~|~100% CMAQ signal work, Phase D. Coaxial to fiberopticLocal Sponsor-Columbus~|~21 - Safety~|~8F6BECB0FF46A9AAA818664BA70CD56220E513C6 82573~|~1~|~2~|~02/CMQ/COL~|~100% Local funding - Costs to upsize fiber strand count during construction for Columbus Department of Technology.~|~21 - Safety~|~D35705F4A316C84186DB7F88D34614952CC1062E 101097~|~1~|~1~|~01/SAF~|~Add turn lanes at US 33/Fishinger Rd~|~21 - Safety~|~0F85EF5457589337F3F1B161E84677ABD9B54BB8 101097~|~1~|~2~|~02/SAF~|~Replacement of the traffic signal only at intersection of Fishinger Rd and Nottingham Rd. Pedestrian facilities not under this split~|~21 - Safety~|~6ECB8D4375E7D3D30A052A42CC796739CD489710 101097~|~1~|~3~|~03/NHS~|~Paving and guardrail work~|~05 - 4R Maintenance - Resurfacing~|~167D7DF99CAB5F878048CE657F3D8C9884B3C321 102414~|~1~|~1~|~01/NHS~|~STA SR 21 from 17.33 to 21.44.~|~~|~7ADCE4BFB265E64A3AA81138F95643BDBA59A0A2 118746~|~1~|~1~|~01/SAF~|~All work is included in this split.~|~21 - Safety~|~64A6659A5D5630CBCB352F04DA9B3B1C46723DF1 101178~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route~|~05 - 4R Maintenance - Resurfacing~|~B096A7A3CFCCDF5C65C1D4A621042FFFFA484CA9 101178~|~1~|~2~|~02/S<2~|~AC overlay without repairs on small urban route~|~05 - 4R Maintenance - Resurfacing~|~440255AC9FCBB726399F47FFC9FA85DA675435A1 101178~|~1~|~3~|~03/NHS~|~Remove asphalt, patch, waterproof, and pave~|~47 - Bridge Preventive Maintenance~|~7A2B2E7A10EBCA6F3027373FCB53F27B6075411A 123499~|~1~|~1~|~01/STR~|~Chip Seal Project~|~05 - 4R Maintenance - Resurfacing~|~3B4285665E563051474FBEE486EF8EA2A811C8E4 107829~|~1~|~1~|~01/STR~|~Resurfacing from the Allen County line to the Findlay Urban Area boundary at CR 9 at 12.06.~|~05 - 4R Maintenance - Resurfacing~|~A37E3425C5F4AC91265C755F8A195620C60C24D8 107829~|~1~|~2~|~02/S<2~|~Resurfacing from the Findlay Urban Area boundary at CR 9 at 12.06 to the end of the project at 13.29.~|~05 - 4R Maintenance - Resurfacing~|~D05842A2F4E313B53210C57F8ACD3ABEAA0B1A71 122381~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over Branch of Lake Fork~|~04 - Reconstruction - No Added Capacity~|~7601C2B09F955FC086C953FE72E25C3A8751A48A 115925~|~1~|~1~|~01/NHS~|~Resurfacing WAY US 30 05.30 to 11.62 AC Overlay W/Rpr~|~05 - 4R Maintenance - Resurfacing~|~F3F2B044454C40E850F9ED245A44C940DFC58692 115925~|~1~|~2~|~02/BRO~|~Bridgw Work to be Determined at a later Date.~|~13 - Bridge Rehabilitation~|~E678FF504638E58C2755C10EA7C361A360402379 125075~|~1~|~1~|~01/NHS~|~Plan split to program project. Update at scope complete.~|~13 - Bridge Rehabilitation~|~F9619FAB90046E90403E3D7D591DA1FD0007F1ED 107714~|~1~|~1~|~01/IMS~|~Pavement Replacement~|~04 - Reconstruction - No Added Capacity~|~00773982990C09638246C1E4D6B0AE4EF79D5F6E 107714~|~1~|~2~|~02/IMS~|~Resurfacing for LOR-90-13.17 to 13.57~|~05 - 4R Maintenance - Resurfacing~|~7CE0701A85FBB8219DF0355F937B1560104C44B9 107714~|~1~|~3~|~03/IMS~|~Deck Replacements on LOR IR 0090 11.53 L&R~|~13 - Bridge Rehabilitation~|~076C318713D35F3DB93C47738480BE1CCCF070CC 107714~|~1~|~5~|~05/IMS~|~Added capacity portion of pavement replacement. ~|~03 - Reconstruction - Added Capacity~|~EA23F826FD9BBA94994F79CAF9D258C516D7B69D 107714~|~1~|~6~|~06/S5K~|~Full depth pavement replacement.~|~04 - Reconstruction - No Added Capacity~|~EC43FB94AFEECE0EB2B352BB401598064B014FAA 107714~|~1~|~4~|~04/SAE~|~Purchase and install digital message signs (DMS) on IR 90 to improve driver information. LOR-90, slm 12.5 to 13.0 Eastbound, 13.4 to 13.9 Westbound,15.8 to 16.4 Westbound.~|~21 - Safety~|~462AC11621FBE779C61885796FF86242C1E39D65 98933~|~1~|~1~|~01/IMS~|~District Wide Pavement Markings~|~21 - Safety~|~D09287EAB0E54FE69BCF551E3C205A75063EA052 93270~|~1~|~1~|~01/STR~|~General system paving of MAR-203: 0-7.74~|~05 - 4R Maintenance - Resurfacing~|~8A63002A83A503D4A5EFA5EABCE05D0541FBB5D5 96199~|~1~|~1~|~01/NFP~|~Facilities Funding - ReRoof District HQ~|~44 - Other~|~C1773176814ED2A8DAFCDDD186F558891AC6E07D 87194~|~1~|~2~|~02/S<2~|~This split is for work on SR 37 that is inside the Findlay Urban Area although outside the City of Findlay. It is for the work from the beginning of the project at 2.57 to the Findlay Urban Area boundary at CR 180 which is at 3.19. All funds are from the District Preservation Program budget. 80% 4PF7 and 20% 4PS7. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~62C016ED4CAC75AE8378517613E25E686B2B3F65 87194~|~1~|~3~|~03/NFA~|~All work on SR 698 from the south corporation limits to the north corporation limits of the Village of Jenera 0.25 to 0.77. All funds are from the District Preservation Program budget. 100% state funds SAC 4PS7. There are no local funds in this split. The work in this split is on a rural minor collector and is not eligible for federal aid.~|~05 - 4R Maintenance - Resurfacing~|~3BD213F4B510FADBC19A4B2EFA628F9081E68078 87194~|~1~|~1~|~01/STR~|~All work on SR 37 outside the Findlay Urban Area. On SR 37 in Hancock County from the Findlay Urban Area boundary at CR 180 which is at 3.19 to the end of the work at 6.32. All work on SR 103 from SR 698 to the east corporation limits of the Village of Arlington. All funds are from the District Preservation Program budget. SACs 4PF7 and 4PS7. There are no local funds.~|~05 - 4R Maintenance - Resurfacing~|~CD8FFD4FB9D8E39C9C63B04FE4DE19C9BA46408A 94280~|~1~|~2~|~02/NFP~|~Highland Project Management fees~|~01 - New Construction~|~9576D90A59CAE3799AE992C0E9ACB9877C497549 94280~|~1~|~1~|~01/NFP~|~100% StateIn Fiscal year it is proposed to construct a new highway garage.~|~44 - Other~|~DB22AE2F0D7395B969290CCB51C81E4C36C00880 92635~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete on MOT SR 235 1.92 from SLM 1.92 at IR 70 to the MOT/CLA County Line (SLM 2.52)~|~05 - 4R Maintenance - Resurfacing~|~82FA86BEF21B9CD2A35773DCD69E75142ED0A120 107819~|~1~|~2~|~02/STR~|~MAR-203-3.24 to 7.74~|~05 - 4R Maintenance - Resurfacing~|~5D3DD6056C978FFE2590C2244A2AE91F9E72862F 107819~|~1~|~1~|~01/NHS~|~MAR-23-2.44 to 7.61~|~05 - 4R Maintenance - Resurfacing~|~E01E20549B5B0427BD7947B14948557C6A5E722A 104602~|~1~|~1~|~01/MPO~|~Rehab of Idora Bridge in Mill Creek Park.~|~13 - Bridge Rehabilitation~|~C255CFF09B38A8B4766551C40A0083D755631D30 97691~|~1~|~1~|~01/NFP~|~"01/NFP/OT" - Construction of new county garage facility at location of current county garage.~|~01 - New Construction~|~C696E50D202BEF980B95C88096F0833C239524AD 96975~|~1~|~1~|~01/IMS~|~Replacing raised pavement markings on various routes throughout District 4.~|~21 - Safety~|~8A31980A960CD31198A731FD5684A492A434928E 101822~|~1~|~1~|~01/NHS~|~Replace existing structure (HAS_22-0264, SFN 3400573) on US 22 with new structure.~|~10 - Bridge Replacement~|~7B0DAD1BC6C4E93AB725124CBC873EF96754EB3D 125976~|~1~|~1~|~01/SAF~|~Pavement Markings ~|~17 - Construction Engineering~|~707A6D8BDE832B5ECB79D2EE0229B20CE50D1C81 93948~|~1~|~1~|~01/NFP~|~This is the district's FY 16 district wide lighting maintenance construction contract using 4CP7 sac.~|~21 - Safety~|~62ECC49711E4D0D2738F6754E65A40C16487C863 104767~|~1~|~1~|~01/NFP~|~Districtwide RPM Replacement.~|~21 - Safety~|~89A93E2E87E118C29B43C170927B02470C81E02E 121189~|~1~|~1~|~01/STR~|~Upgrade Highway Lighting~|~21 - Safety~|~0C02B119A6532C18F54AA5F73F0CE0369FE4F7C4 93714~|~1~|~1~|~01/STR~|~01/STR/BR/ ; WYA-103-0510, SFN 8802548; 100% State funds - 4PS7 - No Cap~|~10 - Bridge Replacement~|~043057E47AA39B47B346491302317943CF2FF21C 93714~|~1~|~2~|~02/BRF~|~02/BRF/BR/ ; WYA-293-0476, SFN 8803781; 80% Fed (4PF7) - 20% State (4PS7) - No Cap~|~13 - Bridge Rehabilitation~|~ABD47F5939E55F67A1B3505D89E53D8AE400369E 117005~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~15D0DBA90A1A3CCF7AA166DCFE1E5EEFB8770757 117005~|~1~|~2~|~02/STR~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~7D08FD6B8AEB566A268DDB8B5471DA20964C8B1F 117005~|~1~|~3~|~03/STR~|~Minor bridge work, 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~0C8402B59F3FDDE6CBECD70DDC6996888092C616 83571~|~1~|~3~|~03/S>2~|~Demolition of the Goodyear building at construction site acrossed from Mall Drive 6.~|~21 - Safety~|~27E1AF9718FAB7ED9285F1A8FD679FF7D612B816 83571~|~1~|~1~|~01/S>2~|~Reconfigure SR 741 from SLM 3.15 to 3.62, remove traffic signal at SR 741 and Mall Drive 5/Prestige Plaza, upgrade traffic signal at SR 741 & Mall Drive 6 in Miami Township.~|~21 - Safety~|~A4AD685742FD2A6E70A6F061FED5DCD7C335F200 83571~|~1~|~2~|~02/S>2~|~Reconfigure SR 741 from SLM 3.15 to 3.62, remove traffic signal at SR 741 and Mall Drive 5/Prestige Plaza, upgrade traffic signal at SR 741 & Mall Drive 6 in Miami Township. This split covers district's allocation to cover the overage of the Safety project cap.~|~21 - Safety~|~E7A1111868A411AE67F5185725AB06F88E3C2831 98288~|~1~|~1~|~01/IMS~|~Rehabilitation of GUE-70-1.26 L and R structures~|~13 - Bridge Rehabilitation~|~A7FD4D213A811BCFA6C0521C769EAF903B9009DE 120768~|~1~|~1~|~01/ERD/UOFA~|~Center for Rehabilitation of Aging Transportation Infrastructure.~|~~|~8DF20008DB24848BAA1AC9261F24D22716CD4F66 117677~|~1~|~1~|~01/SAF~|~Plan split for all roadway work on SR-2~|~04 - Reconstruction - No Added Capacity~|~D9C360F3E21836A5B08985ADE4B2CFC1D9688A70 117677~|~1~|~3~|~03/BRO~|~Plan split for new bridge~|~08 - Bridge - New Construction~|~959C0DA32ED4BB5C391CA24ADC654DD36A9A3B06 117677~|~1~|~2~|~02/BRO~|~Plan split for all work on existing LUC-2-1026 structure~|~13 - Bridge Rehabilitation~|~623FE8A2042B815931E382E0624190D957D14A7C 115787~|~1~|~1~|~01/SAF/CCEO~|~Reconstruct approximately 4600? of CR 7, improving horizontal and vertical curves as well as widening the pavement and berms and removing fixed objects from the clear zone. ~|~21 - Safety~|~CFC70FEDF68605FDD94E715EB230662E91DEFF4A 114032~|~1~|~1~|~01/ENH~|~Construction of new pedestrian bridge over Sandy Creek in the Village of Minerva.~|~28 - Facilities for Pedestrians & Bicycles~|~427A49A12985F12C0EA185195B91DF492E184090 100925~|~1~|~1~|~01/S>2~|~Widening of the south side of Indian Ripple Road from Darst Road to Marydale Drive to extend the second eastbound through lane. Installation of curb and gutter and storm sewer system, lighting, and a 5' wide sidewalk along the south side of the roadway. Access management improvements will also be made by the City east of Darst Road.~|~21 - Safety~|~3E5CCFCF3AD018A0ACD75E38BD5B0ECF1423CBDE 97759~|~1~|~1~|~01/NFA~|~Auglaize County Garage Wash Bay installation~|~44 - Other~|~9A6AECDB86F0CAE544ADBE73FB74FAEFF6BAA90E 112247~|~1~|~1~|~01/IMS~|~All items associated with crack sealing on MRW-71 and UNI-33.~|~05 - 4R Maintenance - Resurfacing~|~D0D02D4B467477E146294FDA61AF9ED769A3A5F7 94522~|~1~|~1~|~01/BRF~|~Reconstruct Bridge No. BUT-CLEVL-0088 (SFN: 0960144) over Two Mile Creek with a 60 to 70 foot single-span structure composed of concrete box beams with a composite deck and sidewalks on both sides~|~13 - Bridge Rehabilitation~|~B183F26325EE16EBCA1BDF630C24AFF870371593 97492~|~1~|~1~|~01/NHS~|~Replace backwalls and associated work to facilitate the construction of same for structures COL-30-3413 L (1502379), COL-30-3413 R (1502328), & COL-30-3413 CD (1502298).~|~13 - Bridge Rehabilitation~|~8D1DE9EEDAAA2B8D615183289D367C3F0BED0D98 97492~|~2~|~2~|~02/NHS~|~Replace backwalls and associated work to facilitate construction of same on structure COL-7-0594 L (SFN 1504800).~|~13 - Bridge Rehabilitation~|~C1D6B8B64891997ACC6C48F5477BB4DBD2BCFD8A 93087~|~1~|~4~|~04/S<2~|~Signal maintenance/upgrade project. Replacement of pull boxes, detectors, misc signal hardware. Federal 80%/State 20%.~|~21 - Safety~|~473D96CADB4D4A16CC59891023E12FC0892F4AAF 93087~|~1~|~1~|~01/SAF~|~Signal maintenance/upgrade. 100% safety funds for safety items such as the battery backups, backplates/heads, and LEDs.~|~21 - Safety~|~943195FB2AD378B68BE0AC89041F9117F00C6C9B 93087~|~1~|~3~|~03/STR~|~Signal maintenance/upgrade project. Replacement of pull boxes, detectors, misc signal hardware. Federal 80%/State 20%.~|~21 - Safety~|~AB0490FEC2B30B1A93C52EC0BDCFE49873655F0B 93087~|~1~|~2~|~02/NHS~|~Signal maintenance/upgrade project. Replacement of pull boxes, detectors, misc signal hardware. Federal 80%/State 20%.~|~21 - Safety~|~D3336B00AE38762798F494A7E23F21477188337C 108736~|~1~|~2~|~02/S<2~|~mill & fill on SR 598 within the corp limits~|~05 - 4R Maintenance - Resurfacing~|~79CBA58E23DF59B9775AD467861B2DF8FD388752 108736~|~1~|~3~|~03/S<2~|~mill & fill on SR 598 outside of the city corp limits~|~05 - 4R Maintenance - Resurfacing~|~2DFCFB12A6C97AC17673AA1A2B246CF08632B132 108736~|~1~|~4~|~04/S<2~|~mill & fill pavement repairs on SR 598 within the city corp limits - 100% local funding~|~05 - 4R Maintenance - Resurfacing~|~CE0DA23F41224C684233C6AF6FBB3E580F9A3EE3 108736~|~1~|~1~|~01/SAF~|~Project work using Safety and Small City funding excluding urban paving funds~|~21 - Safety~|~503CDF34B686CDBD011095AF7C50BD441498EC84 108736~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~000EEE7E92072D7A75C50AB3C31600902A734647 96779~|~1~|~1~|~01/STR/PIK~|~It is proposed to replace the Sheets Road Bridge (SFN 6633110)on TR 254 (SLM 0.14).~|~10 - Bridge Replacement~|~A0D390AD7E8D91DE36E0C5C57C0F8E3A5FD7C764 97323~|~1~|~2~|~02/NHS~|~Culvert replacement project. ATH 13 3.88 (CFN 050130028 )and ATH 550 0.96 (CFN 055500025). NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E1E45E6A7EF9178AA2EE5A8C5A9BCE5459181B4 97323~|~1~|~3~|~03/NFA~|~Culvert replacement project. ATH 690 4.09 (CFN 056900409). Not on any federal aid system. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6335B4F8030E4803197354DBD805B165F56EC91 97323~|~1~|~1~|~01/STR~|~Culvert replacement project. ATH 13 0.62 (CFN 050130006), ATH 56 4.16 (CFN 050560260), ATH 329 14.09 (CFN 053290700), ATH 550 12.28 (CFN 055500510), ATH 681 4.32 (CFN 056810245), VIN 50 23.08 (CFN 820500149), VIN 50 25.14 (CFN 820502514), VIN 50 25.22 (CFN 820502522), VIN 50 25.46, VIN 56 0.12 (CFN 820560002), VIN 56 0.25 (CFN 820560003), VIN 56 3.33 (CFN 820560016), VIN 93 11.93 (CFN 820930071). Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FD9469B31E9ACCF96DED4F82FA260C2E548F2DA9 83953~|~1~|~1~|~01/STR~|~Replace bridgeSFN 2103729, DEL-605-1.93, over Duncan Ran01/STR/BR~|~13 - Bridge Rehabilitation~|~93BB81187BC501522DC974EF6505678418CBBCFE 105272~|~1~|~1~|~01/STR~|~Resurfacing BEL-147~|~05 - 4R Maintenance - Resurfacing~|~1B4A01E2B251BB8253E9640CC26DBDFEAB8C99F4 123322~|~1~|~1~|~01/IMS~|~Plans Split for work associated with conduit repair~|~04 - Reconstruction - No Added Capacity~|~B824574ADD9D41FD0D799A4CF93AE3C0B883F49D 107841~|~1~|~1~|~01/IMS~|~OH18-01 ER Event. Landslide repair. WAS 77 6.07 N. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3A85394ED762BFB718F20F8F5D89F3D02334066A 97431~|~1~|~1~|~01/S>2~|~Local intersection reconstruction.~|~04 - Reconstruction - No Added Capacity~|~01E5C86B2B0870F160C9BEDCBB9EEDF346A3F98F 102803~|~1~|~1~|~01/S>2~|~Work eligible for GSM funding to construct a retaining wall on the south side of Lorain Road just east of West 192nd Street.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A867E791E0146877C200FDB55001C8A45C7440F6 117947~|~1~|~1~|~01/S>2~|~North Knot proposed design on Lane Avenue.~|~03 - Reconstruction - Added Capacity~|~AF7ECF607694F715C44A2CDC773EC1ED9921434D 117947~|~1~|~2~|~02/S>2~|~North Knot construction engineering for Lane Avenue.~|~~|~ADB1DCE3E4A8FF1AF49BE3F961507F73DFDD3D9C 117947~|~1~|~3~|~03/S>2~|~North Knot CE for Lane Avenue~|~~|~0625EB5E49F3CD04A047680E28C93A39EB8D333B 101832~|~1~|~1~|~01/STR~|~Loop Detector Repair~|~44 - Other~|~7350B7F07F6847AB798BA04C70C13FBAEBD4CAA4 102262~|~1~|~1~|~01/NHS~|~This plan split is for NHS routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~88F0D55C3B3A5E092CEE96F3A539B405F4F518C8 125494~|~1~|~1~|~01/NFA~|~Culvert replacement project. WAS 260 3.55 (CFN 1803758).~|~04 - Reconstruction - No Added Capacity~|~6109A16C7F68AD0775756791CA8E6CE04FF109A2 94046~|~1~|~1~|~01/IMS~|~Guardrail job order contract using 4CP7 funds.~|~44 - Other~|~0547E932107F053DAC97FF656C0175E5FFE67212 94046~|~1~|~3~|~03/NFA~|~Fence replacement at two ODOT maintenance yards using LBM7 funds.~|~44 - Other~|~4F2BED8BEE973766C011021B35515AF98B11DDCA 94046~|~1~|~2~|~02/IMS~|~90/10 fed/state/ plan split for systemmatic replacement of guardrail.~|~44 - Other~|~9E4B724E10441BD7E3926EFA48A8F1FFC227F087 121112~|~1~|~1~|~01/STR~|~Plan split for culvert replacement at OTT-590-3.52~|~04 - Reconstruction - No Added Capacity~|~2EAFB088A39DEC832894F159403F4A25E058D199 96093~|~1~|~2~|~02/STR~|~100% Local Richwood items~|~05 - 4R Maintenance - Resurfacing~|~AF170C04D8D95F748A830BD298690E24E5BD369C 96093~|~1~|~1~|~01/STR~|~STP Rural Pavement 80/20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE73FA1B9B37465E3D9F4B271D42D18240F8B352 125884~|~1~|~1~|~01/S>2~|~Plan split to perform concrete pavement repairs utilizing NOACA STBG funding~|~05 - 4R Maintenance - Resurfacing~|~ACBA31A2BE19E5E53C5A86920FC27188F509FB04 113285~|~1~|~1~|~01/S<2~|~Field Pave/Culvert Repairs at RIC US 0042 06.01 & 06.02~|~04 - Reconstruction - No Added Capacity~|~48CCD2B4987716B8335E6620B70C8486D0677BB5 88809~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~B983628DE591196239498B7E432C6A9FB24CBB8C 96886~|~1~|~1~|~01/BRF~|~Bridge replacement~|~~|~B0E508ABFB939EA38BC6CFC9FA0CBD50DA807252 116631~|~1~|~1~|~01/IMS~|~Delaminated Sign Replacement Overage~|~44 - Other~|~949D07D6021E06CC06CD66B3D5CB5EF3A36C70EC 113161~|~1~|~1~|~01/CMQ~|~Intersection improvement at Highland Rd and Valley View Rd.~|~04 - Reconstruction - No Added Capacity~|~FBFAF8910C6CB841BF27FAEADCC72F3CFB9B17E5 111674~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2025. Various routes and sections. Funded 100% State.~|~21 - Safety~|~69B9E2D305CF1BCAAD81C5F70DB018EFE1C342D3 92549~|~1~|~1~|~01/NFA~|~Constructing a new pedestrian,bicycle and handicapped route downtown to the North side of the Village of New Bremen. S terminus is the existing trailhead to Minster at restored Lock 1 & Lockkeeper's House;N Terminus is Lock 2 Rd, NCL~|~28 - Facilities for Pedestrians & Bicycles~|~3AE102464DEA73E9E3BA0F993B05F63C876FCF8C 127070~|~1~|~1~|~01/ENH~|~Construction/reconstruction of sidewalks and ADA facilities, utilizing Federal TAP (80%) and Safety (20%) funds up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~7F9244DAD3648826904BCA9899B375D4BBE3E614 114446~|~1~|~1~|~01/NFP~|~All work in this project.~|~13 - Bridge Rehabilitation~|~35BC87DF54512A6B601CD68079396AE69B571D23 94741~|~1~|~1~|~01/SAF~|~CO Safety will participate in up to $8m for this project. This work will consist of widening northbound IR-71 from the existing northbound exit to Ridge Road to the northbound exit from IR-71 to Red Bank Road. As part of this widening, the northbound entrance ramp from Kennedy will be reconstructed to pass between the pier and abutment of the Kennedy overpass over IR-71. A large retaining wall is anticipated as part of this work along northbound IR-71 from north of Kennedy to the exit ramp to Red Bank.~|~~|~6EE8EB93E5D348D083AB7B20C5010FBC43F278FD 94741~|~1~|~2~|~02/SAF~|~This work consists of $3m of unfunded work. This work will likely consist of removing the northbound IR-71 exit ramp to Ridge North and making improvements to Ridge Road.~|~~|~BE74A34576F52BFD7D5F280F07ADA0597B1DAF70 94741~|~1~|~3~|~03/IMS~|~Use of capital budget to complete construction funding estimate.~|~~|~0C41A62E659FCE78F820A4C85BDBBDEB64F40F9E 111627~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items using 4TA7 (NOACA)~|~05 - 4R Maintenance - Resurfacing~|~EE5590608EB226AEFA58556CA5AA8B6B404C14ED 120981~|~1~|~1~|~01/S>2~|~Construct new sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~C841C1AFEB42F5858067B2E34A424A0ABC6EDF2D 121941~|~1~|~1~|~01/MPO~|~Plan split for the addition of bike lanes within roadway, upgraded pedestrian crossings, and TLCI implementation work items.~|~28 - Facilities for Pedestrians & Bicycles~|~D2000C7D27EA6C874C13B07E7FD06FEB2F44BF66 102627~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Resurfacing with related work on FAI-SR 256-05.99 to 14.12~|~05 - 4R Maintenance - Resurfacing~|~14DF6EF48536831A0C95C9B4000CAE6048D03FFC 102627~|~1~|~2~|~02/SAF~|~Safety Recessed-Wet Reflective Funding - 4BC7 (100% State) - See CAP Comment - Safety Funding for the application of Recessed-Wet Reflective process on Longitudinal Striping.~|~05 - 4R Maintenance - Resurfacing~|~3172CB416530D43EB0923C5924A035EB02949653 124125~|~1~|~1~|~01/S5K~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~28BFDC52E06E5C8189DCB0D5DE26D06D28745010 124125~|~1~|~2~|~02/S5K/ZANE~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~F25A4FF3B08B8F55A932193E8E5D93EF4BC5A5D0 84657~|~1~|~1~|~01/IMS~|~Construction of two noise walls along IR-480, in the City of Twinsburg, Summit County, Ohio. Construction of NSA#4 near the Chamberlain Trail/Mortus Drive/Greenway Drive/Concord Circle/Gettysburg Drive residential neighborhood. Construction of NSA#6 in the Birchwood Park/White Oak Drive residential neighborhood.~|~44 - Other~|~55E85A60DE9F9157344ECD1816E4186615248574 112647~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district.~|~21 - Safety~|~D61BC95CDB4EEA7979AB0545D018F9C78D5CBE4E 117424~|~1~|~1~|~01/NFA~|~Bridge rehabilitation CEAO funded (BFP)~|~13 - Bridge Rehabilitation~|~20974511B0C71D4C5796DB28ABA73D134F0CA2E1 114207~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~57FF6D147A733A1D014B20B2FF359BCEBA4120DF 111604~|~1~|~1~|~01/MPO~|~For federally eligible items in Construction and CE from SAC 4TA7 (NOACA)~|~05 - 4R Maintenance - Resurfacing~|~B5F6D29D4D6B8B871B5127ADCAADA7AAA0E880F4 100497~|~1~|~1~|~01/STR~|~ADA 125 (10.18-14.71)~|~05 - 4R Maintenance - Resurfacing~|~14036873543756D906E6AF629E9DB9293AD300ED 102770~|~1~|~1~|~01/NHS~|~Bridge Replacement: WAY-250-19.26 (SFN 8504830)~|~10 - Bridge Replacement~|~DEB529F2C36C7217A27E5CA53C85A26B2ABE18C5 107388~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement for FY2023.~|~21 - Safety~|~91B6A1CCBCCA82E0BA25D582F6525E23860AA330 107388~|~1~|~2~|~02/STR~|~Extrusheet sign replacement for FY2023. ~|~21 - Safety~|~820EF0FD8D2B09AF494D2EDE2B8FE260AA9096B9 107388~|~1~|~3~|~03/S5K~|~Extrusheet sign replacement for FY2023.~|~21 - Safety~|~5DD5025184809C5D838B4D28F7B5882E2510E1AE 109876~|~1~|~1~|~01/STR~|~Bridge Repair~|~17 - Construction Engineering~|~FAD96E2FC18EFE9231D1A7C55F9CD57E9E082EAA 101403~|~1~|~2~|~02/NHS~|~Settlement repair near SLM 5.0~|~05 - 4R Maintenance - Resurfacing~|~88E1BE5D1B562DB0D78BE8373E4008D25125A621 101403~|~1~|~1~|~01/NHS~|~Resurfacing on BUT-4 By-pass~|~05 - 4R Maintenance - Resurfacing~|~9C9AFE1F93C3397EA50870149DAE0595AB9F3071 94796~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 0.531 to SLM 1.594.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C718CE3A05B98AB63E81D55DF4C2B8A5CDAC5AC5 115313~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E881B40B0E4D24B116A357F6590EA2D5ED576B3C 115511~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~~|~90FE472469D4289EFADB0BD280595EBDDED91168 98628~|~1~|~1~|~01/BRF~|~OBPP SFN 5234026 bridge replacement using Design/Build~|~10 - Bridge Replacement~|~1DABEF167EFD071558CE2AB40563AA7C45392BE1 105531~|~1~|~3~|~03/SAF~|~Plan split for rumble stripes from SLM 9.25 - 11.48~|~05 - 4R Maintenance - Resurfacing~|~443485D3F80E9AAD20A4144850EF2B486773A1CF 105531~|~1~|~1~|~01/NHS~|~WOO SR 795 between SLM 2.35 to 9.249~|~05 - 4R Maintenance - Resurfacing~|~F4B481BB98F9AB6445B607B1A4C56D38FF5EBDA1 105531~|~1~|~2~|~02/S>2~|~WOO SR 795 SLM 9.249 to 11.484 and OTT SR 795 from 0.00 to 0.718~|~05 - 4R Maintenance - Resurfacing~|~3CC39A118AB355440CA22C97B5198B512983129B 105531~|~1~|~4~|~04/SAF~|~Plan split for traffic signal work at Oregon Rd.~|~21 - Safety~|~E56C4349B8F4D0E5D7A95D454A4C1BBEF097458D 103689~|~1~|~1~|~01/SAF~|~Work necessary to construct a roundabout. Federal funds from the state safety program and the Small City Program with the match provided by the City of Defiance. All funds over the capped amount will be provided by the City of Defiance. Funding priority is Small City Program, Safety Program and then 100% city if any.~|~21 - Safety~|~2AD917697C8F02FC04E7809F33EC8690993A7FE0 103689~|~1~|~3~|~03/NFP~|~Waterline costs to be paid 100% by the City of Defiance.~|~43 - Utilities~|~F1C8AA3744B3CC0ADDC572BF3F70EBA4C4814E90 103689~|~1~|~4~|~04/S<2~|~SR 15 resurfacing. 80% Federal funds from the District Preservation Program Budget with the 20% match provided by the City of Defiance.~|~05 - 4R Maintenance - Resurfacing~|~E4FE2A02287B8501FB1FAD28CB02A61404FA1B3B 103689~|~1~|~5~|~05/ENH~|~Bike and pedestrian items at the intersection portion of the project. The work will be paid with funds from the Transportation Alternatives Program (TAP) up to the cap and then Small City and Safety would be used if available until their caps are reached. After all federal funds caps are used, any needed funds will be provided by the City of Defiance.~|~28 - Facilities for Pedestrians & Bicycles~|~83F8779E8CB1B419D4CB1E808C3F614A6CAD3B9D 103689~|~1~|~2~|~02/ENH~|~Work to construct a Multi-Use Path. This is for costs outside of the intersection area. Costs inside the intersection area where a roundabout will be constructed are in Plan Slit 5. 95% federal funds using Toll Revenue Credit (TRC) from the Transportation Alternatives Program (TAP). The local match and any funds needed over the TAP cap will be provided by the City of Defiance.~|~28 - Facilities for Pedestrians & Bicycles~|~5FC09AA12C68115E8EBDE72F80235521B6698D82 111568~|~1~|~1~|~01/SAF~|~Federally eligible items.~|~03 - Reconstruction - Added Capacity~|~BB65C13818BF70FBED4B151D4A976C7B90A2A645 111568~|~1~|~2~|~02/S<2~|~Federally ineligible items.~|~~|~C7FEBBD212077BB6F75B7207A71802B6F6FBF28C 111568~|~1~|~3~|~03/MPO~|~Federally ineligible items.~|~05 - 4R Maintenance - Resurfacing~|~1348823FFCAF3277EDBF48F34F43EA3BE1C645F6 119254~|~1~|~1~|~01/STR~|~Highway Lighting~|~~|~42ADE0CE061D2DE9B883B9787B08339066ED24DE 111607~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - 80% Federal (4SF7) and 20% State (4SS7) - slide repair by removal of excess pavement and installation of geogrid and/or light weight material.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8F62C962F9D37E624AF43C5E02EF0D21779A8015 119382~|~1~|~2~|~02/S>2~|~Culvert other.~|~47 - Bridge Preventive Maintenance~|~DBC6256954AADD00F9467ECADAA9B89277FED98D 119382~|~1~|~1~|~01/IMS~|~Lining culverts.~|~04 - Reconstruction - No Added Capacity~|~C23AD03F7F36AAD6FF6B1FEC69CCE878F8076AC4 119382~|~1~|~3~|~03/STR~|~Culvert other.~|~04 - Reconstruction - No Added Capacity~|~018033E617EE0CCDA1D28A58B214BE9EEFEB77D7 119382~|~1~|~4~|~04/NHS~|~Minor culvert work.~|~04 - Reconstruction - No Added Capacity~|~56CFFA8A0DCB83005FE25371DB40BB29C9521B18 91493~|~1~|~1~|~01/SAE~|~Widen SR-747 to provide a 450' NB right turn lane, restripe Union Centre Boulevard to provide a 550' EB right turn lane, and replace the traffic signal at SR-747 & Union Centre Boulevard while providing right turn overlaps, providing new signal heads with backplates, and counting and retiming the traffic signal.~|~~|~7EA5CA9BAF0399C13DBEB5F32BA32E72DF056FFF 98083~|~1~|~1~|~01/BRO~|~Replacement of an existing 7 span bridge that carries Kennedy Avenue over the Genesee & Wyoming railroad.~|~10 - Bridge Replacement~|~F557991DD704D499549CC10F2B0F9FCA06D73D0D 114690~|~1~|~1~|~01/IMS~|~Lighting replacements on Interstate routes in D8.~|~21 - Safety~|~978D4372E5D4AB6A9D99A14C1920C484A542DFC0 93887~|~1~|~1~|~01/IMS~|~Construction of five noise walls on Interstate 76 in the Lake Milton area, Milton Township.~|~44 - Other~|~EDFC8A093B0B89C9F520D7F138F4B0799FE57FDB 120285~|~1~|~1~|~01/SAF/HUDS~|~Pedestrian improvements on various routes in the City of Hudson.~|~28 - Facilities for Pedestrians & Bicycles~|~F2FED700EF9DECAE3FA9807507A7CA39D53A2BCB 91492~|~1~|~1~|~01/NHS~|~Gahanna urban paving on NHS routeFRA-317: 16.72 to 18.89~|~05 - 4R Maintenance - Resurfacing~|~3ABE7415B9AB1962206582305B4523BF0F92A6CF 116942~|~1~|~1~|~01/S>2~|~Roadway Improvement~|~03 - Reconstruction - Added Capacity~|~DEB50372512D1A405FDF2910DFD9C7C90CCA1C34 116942~|~1~|~2~|~02/SAF~|~Sidewalks~|~28 - Facilities for Pedestrians & Bicycles~|~EBC0ADEFA59599295181399A9E1D93F1E55470B4 120321~|~1~|~1~|~01/NHS~|~added plan split.~|~04 - Reconstruction - No Added Capacity~|~0976ADE95EF44364F2661E9E3450E5D92DD1CF43 92496~|~1~|~1~|~01/SAE~|~Pavement markings~|~21 - Safety~|~FAEF56B36A231C6947BC0907BBFD19FAF9FCB1DD 88009~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7730217 Bank Street Bridge over Little Cuyahoga River~|~13 - Bridge Rehabilitation~|~37058B8E8B57A68DBC779A4B166FD7639421B5A9 115750~|~1~|~1~|~01/NHS~|~Split for the ramp deck replacement and repairs to the SR-176 bridge~|~13 - Bridge Rehabilitation~|~489F490B59B8189B156F1B03F278327DB57C189A 126041~|~1~|~1~|~01/BRO~|~Encase H piles ~|~13 - Bridge Rehabilitation~|~B2619CE886C7406DADCCA61320E0457EC7F757ED 112733~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to MAR-746-6.25 and MAR-37-9.43~|~13 - Bridge Rehabilitation~|~A00DC2A8DA7EB1D8B4A481D8E277DF3E95ADD1C9 119270~|~1~|~1~|~01/STR~|~Guardrail maintenance~|~21 - Safety~|~8728F52942CCA126309D31A74C47EC3829E545AA 92313~|~1~|~1~|~01/NHS~|~Culvert replacement~|~10 - Bridge Replacement~|~3A2809D1BE2915DE65566889D712125B16EE4C5F 127035~|~1~|~1~|~01/ENH~|~All work associated with the multi-use path construction ~|~28 - Facilities for Pedestrians & Bicycles~|~74D6711DF76E2D08B83926E28948817704C6D169 95160~|~1~|~1~|~01/STR~|~Remove and replace the roadway culvert structures on State Route 29 at SLM 0.07, 10.96, and 12.90.~|~44 - Other~|~932B18927F2BCA168C9608C83A747EEFC6A67BF4 101446~|~1~|~3~|~03/NHS~|~LOR-SR58-24.92 SFN: 4703510 (BRANCH OF BEAVER CREEK)/Treatment Type (61): Bridge Railing Upgrade/Repair.LOR-SR58-26.29 SFN: 4703634 (MARTIN RUN)/Treatment Type (61): Bridge Railing Upgrade/Repair.~|~13 - Bridge Rehabilitation~|~B86E99C43751285D66E5B4B2A7DF99200DA6BF48 101446~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% (Lorain) Urbanized Area Inside Corp. Limit (Paving Items): LOR 58 24.66 to 27.56 (RT/LT)~|~05 - 4R Maintenance - Resurfacing~|~389B5D739D67541E2F9133404FD8A93492325CE6 101446~|~1~|~2~|~02/NHS~|~100% Local (lorain): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): LOR 58 24.66 to 27.56 (RT/LT)~|~05 - 4R Maintenance - Resurfacing~|~B8C88F0C9AAE9D1F8FB6C7322D41142597994783 95766~|~1~|~1~|~01/STR~|~SAN-590 from SLM 10.07 to SLM 14.59~|~05 - 4R Maintenance - Resurfacing~|~D6B6F3A0A341AE5BD81ADA450B96BA11036E63F5 119737~|~1~|~1~|~01/BRF/XEN~|~Replacement of the Sycamore Street bridge (SFN 2960192) in the City of Xenia.~|~~|~FE40AE061B04F53C6732975A68B05A9B21141E8F 95968~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This plan split uses 100% 4MA7 funds. All work in this project is in this split.~|~01 - New Construction~|~36454515025CEC55C1509341141F778AC7B41821 121892~|~1~|~1~|~01/STR~|~Bridge replacement of COS SR 83 05.90 (SFN 1601202)~|~10 - Bridge Replacement~|~67893387D41834424AA8D2574E807F1E6B6E9A72 92889~|~1~|~1~|~01/S<2~|~Bridge Work:ERI US6 10.090 SFN 2201666, OVER PIPE CREEK.~|~13 - Bridge Rehabilitation~|~97A8AB7BD12F777C8EC117572AAB07A69BED6613 92889~|~1~|~4~|~04/S<2~|~ERI-250-0.00 TO 0.49, Concrete Repairs in Sandusky (50/50% FED/LOC) Associate Add~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A1A48D9A5A35A7475EBA20A57B0EF233F30541B 92889~|~1~|~2~|~02/S<2~|~S<2 Urban paving Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): ERI US 6 SLM 06.41 to 11.34.Railroad Location ERI-US6-6.59 and 6.61~|~05 - 4R Maintenance - Resurfacing~|~E881D069C1F165F175590008A2DC9D58B397BA27 92889~|~1~|~3~|~03/S<2~|~100% City of Sandusky Items Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, curb removed, curb, etc.): ERI US 6 SLM 06.41 to 11.34.~|~05 - 4R Maintenance - Resurfacing~|~7FCFDB09FAB865D1866B30BDD09031B3E1D33A55 104278~|~1~|~1~|~01/STR~|~SMOOTH SEAL~|~05 - 4R Maintenance - Resurfacing~|~51E038E302D20379B5831ADF9BAD37F9AF1F3590 112675~|~1~|~1~|~01/ERD~|~LED lighting upgrade in D-4~|~99 - State Preventative Maintenance~|~557832C53E7A0190BAFBB59B7269A809E89C188D 112675~|~1~|~2~|~02/ERD~|~LED Lighting upgrade for D-12~|~99 - State Preventative Maintenance~|~20739F0FBF285CFAC017C86DC2CA7DC0DB72EA18 121026~|~1~|~1~|~01/NHS~|~bridge liner plan split.~|~47 - Bridge Preventive Maintenance~|~989915B9C10EABA5BECF4230424F03660F40A7F1 110461~|~1~|~1~|~01/SAE~|~Implement high friction surface course, remove wooden posts, extend guardrail, and upgrade the guardrail end terminal on southbound Green Tree Road at the intersection with SR-123.~|~~|~910C61275D4A03BD2E95E1FEEC13C4EB74B52ADD 83037~|~1~|~2~|~02/NHS~|~Plan split for SFN 0401129 ATB SR 11 8.56 under Mill Rd, SFN 0401153 ATB SR 11 9.35 under Sentinel Rd, SFN 0401161 ATB SR 11 10.42 under Allen Comp Rd, SFN 0401137 ATB SR 11 12.48 under Footville-Richmond Rd~|~13 - Bridge Rehabilitation~|~2CF0C7375D26C3240B44B97AE7E5995C0B4F6426 83037~|~1~|~3~|~03/STR~|~Plan split for culvert SFN 0401218 ATB SR 11 10.69 over Tributary of Mill Creek~|~13 - Bridge Rehabilitation~|~6A93F4ADE27A69E1BE96925277001B9E2A9A8EE3 83037~|~1~|~1~|~01/NHS~|~Resurfacing ATB SR 11 from 8.04 to 13.95~|~05 - 4R Maintenance - Resurfacing~|~E21B32249587F5FFF3B226866B2997EE3DA0C5BB 119042~|~1~|~1~|~01/S>2~|~Urban area plan split for storm sewer and culvert work along FRA-62~|~66 - Resilience Improvement - Highway Project ~|~966238635290180E8C26371460C8587CAC5B6050 111450~|~1~|~1~|~01/MPO~|~Planing and resurfacing in Wooster - various streets~|~05 - 4R Maintenance - Resurfacing~|~7C8F49815A7741A8F0A5D1B00E83EACE604E5007 90885~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/OT/LANC" City of Lancaster SRTS -Total project Cap of $453,385 w/ $45,977 utilized in PE and $407,408 available for Const/CE. Project to add sidewalks and various safety improvements on various City Streets being funded at 100% up to project cap.~|~28 - Facilities for Pedestrians & Bicycles~|~03F470E4C3CDBC2DAB72F0A05C3147C9D7513D1C 90871~|~1~|~1~|~01/BRO~|~7400306 SEN SR12 10.49 Intersect: Fishe Ditch~|~10 - Bridge Replacement~|~A2D185A1F21A88F109B1FAFD3070788B43CE5D75 117341~|~1~|~1~|~01/BRF~|~Primary Plan Split for Local Bridge Program eligible scope items.~|~10 - Bridge Replacement~|~506E67D6359B25FA88AEBE85B9250891BD09C41D 105012~|~1~|~1~|~01/NFA~|~Forest Hills Local School System - School bus replacement project~|~44 - Other~|~B77E6DA2AAE29DC9B14A29BA922B8A295D744F0B 95740~|~1~|~1~|~01/STR~|~WIL-20 from SLM 0.00 to 12.03~|~05 - 4R Maintenance - Resurfacing~|~81EFD2C9586B236551A3D1CC44566EE282865E2D 99575~|~1~|~1~|~01/STR~|~SR-576 from 16.55 to 20.52 SR-49 from 16.27 to 20.52=~|~05 - 4R Maintenance - Resurfacing~|~FDF80CE0CF18B6907F6EDCC2234241874FB41D36 99575~|~1~|~3~|~03/STR~|~Conduit (Culvert) at WIL-576-19.67~|~04 - Reconstruction - No Added Capacity~|~65811BC12D565E0626AC4E6D65ADCE6D06C295FA 99575~|~2~|~4~|~04/STR~|~Plans Split for Part 2 bridge - Wil-576-20.11~|~10 - Bridge Replacement~|~0A8A6C62DB26D8C28FD7391631957AB65FC5F494 99575~|~1~|~2~|~02/STR~|~for Bridge WIL-576 @ 17.73~|~13 - Bridge Rehabilitation~|~23B976929525912836A520EBBC65906362115A5F 111469~|~1~|~1~|~01/STR~|~Culvert replacement. All work in this project. District Preservation Program funds. No local funds.~|~04 - Reconstruction - No Added Capacity~|~4415316958F91E499693AD93436C052961982C4B 110485~|~1~|~1~|~01/SAF~|~Widen existing berm areas four(4) on both sides of the roadway to improve the recovery zone. This will improve the recovery area for vehicle traffic and will allow us to designate a bike lane on each side improving the safety for both the vehicle traffic and the cyclist.~|~28 - Facilities for Pedestrians & Bicycles~|~595518DD78CBA799F77D96056143E82CA29F4B26 98186~|~1~|~1~|~01/STR~|~STP Rural resurfacing 80/20 Fed/State PIC-207-0.00 to 9.57~|~05 - 4R Maintenance - Resurfacing~|~8C8AB7E5E51488284ED3E50EADC35B5610E72A64 106540~|~1~|~1~|~01/BRF~|~PIK CR 9 5.29 (SFN 6630839)~|~10 - Bridge Replacement~|~5891D09C03E555996CB461EEC7694595921EC499 95858~|~1~|~1~|~01/NFP~|~Culvert at SLM 10.89 in Metamora.~|~~|~F87612A19BE802924FCF55714612A39FE7C62221 95575~|~1~|~1~|~01/IMS~|~SFN 8706034 bridge crash damage repairs~|~13 - Bridge Rehabilitation~|~D2C29BD7C40D245850998B246FC3C3B3ACE49531 79059~|~1~|~1~|~01/MPO~|~Pavement repair~|~~|~494B70789E4B2F0F005D1A367DD2B19810DEC99D 100676~|~1~|~1~|~01/STR~|~Microsurfacing COL-172~|~05 - 4R Maintenance - Resurfacing~|~C1CB566E9F232C16310B85FD33D19145E7AC93B7 120594~|~1~|~1~|~01/SAF/LANC~|~Pedestrian improvements~|~21 - Safety~|~6B54B88C650FAEE44268BBDDB22CD73D2EB43E27 109810~|~1~|~1~|~01/SAE~|~Installation of new guardrail and upgrades to existing guardrail on various county roads in Clinton County.~|~21 - Safety~|~CF7A4B94F61DF47B6F79623D82ABBFB6FD049C8F 123003~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~FDB220C9B9E16DF847574E98D29E89F3F5C4EA48 96777~|~1~|~1~|~01/STR/PIK~|~It is proposed to replace the Jasper Road Bridge (SFN 6631096) on CR 43 (SLM 3.26).~|~10 - Bridge Replacement~|~433F2AE811613D86EF7992D8C050C229D51289EF 80032~|~1~|~1~|~01/BRO~|~6201172 OTT SR51 3.85 Intersect: Toussaint Creek~|~10 - Bridge Replacement~|~933C0C11750D0677F89F3A1B2DAA3046EB9D20B7 80032~|~1~|~2~|~02/NFP~|~New Plan Split for Force Account work to replace damaged message board.~|~10 - Bridge Replacement~|~17D0E00B1B178FF2EB2A851AB183825EF6C8AD71 116426~|~1~|~1~|~01/MPO~|~Reconstruction and resurfacing of two sections of E. Broadway St.~|~04 - Reconstruction - No Added Capacity~|~B925376C41C9BA8639A0B70FEF253947E2131E6D 89068~|~1~|~2~|~02/NHS~|~US 50 portion of the Brent Spence Bridge relocation project~|~~|~3D825E10257CF1DEF99EEEB17DA5F972ABE9E50C 89068~|~1~|~3~|~03/IMS~|~Bridge work for Brent Spence Bridge project~|~~|~A00E6A92668A32FB8B2DFA95C5CDDBE8D40FCAC7 89068~|~1~|~1~|~01/IMS~|~Construction funds for BSB.~|~~|~A86A27BBA9D5A709CA54F40E88738E5412028BB3 99503~|~1~|~1~|~01/SAF/LCEO~|~Licking County CEAO HSIP Funds - 4HB7 (Federal 100%) - See CAP Comments - Installation of new/replacement guard rail on various county roads~|~21 - Safety~|~FA6962562B3E30D2A7ED1D85C2AB4AD233D0ECC9 96815~|~1~|~2~|~02/NHS~|~Priority System resurfacing of TUS-36 from SLM 15.92 to SLM 17.63 and on TUS-250 from SLM 21.45 to SLM 23.46 including joint repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~1CF1D2963605E356BB3BE814F5F6F48D56EADB92 96815~|~1~|~1~|~01/STR~|~Priority System resurfacing of TUS-36 from SLM 15.37 to SLM 15.92 including joint repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~224DCC83B482744AA9E7CC89122444A339B35218 104480~|~1~|~1~|~01/NFP~|~Plan split for tree trimming in the interstate system.~|~44 - Other~|~91806F0C8FFBF564C700585BE993CEAF9B63DFF1 115988~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - 80% Federal (4SF7) and 20% State (4SS7) - rehabilitation of rock slope and roadside ditch.~|~66 - Resilience Improvement - Highway Project ~|~B0A19DA6A2F8C34FE4BBF224771BD64839D2C9E7 96277~|~1~|~1~|~01/IMS~|~Project o groove the pavement to increase the friction within the curve along Interstate Route 75 at 15.03 SLM~|~05 - 4R Maintenance - Resurfacing~|~CC014106E22990F3DA0DEBE67B07F26DF3A9A202 95808~|~1~|~1~|~01/STR~|~STP Rural, BEL-149-13.99 and various other sites for culvert repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~DA3444ABA708A371F55C2A6846E72BEC77E6B526 106128~|~1~|~1~|~01/NHS~|~Demolition project on Chesapeake ByPass.~|~44 - Other~|~47BA2AE301F7C72E0ECAFEB5045E37D7CB01174D 101268~|~1~|~1~|~01/S>2/MASS~|~Resurfacing, urban paving in the City of Massillon.~|~05 - 4R Maintenance - Resurfacing~|~3A10016C43D0929DC7D1BD7A0D91F34CFC6C91D7 101268~|~1~|~2~|~02/S>2/MASS~|~Full and partial depth repairs and curb ramp replacements/repairs in the City of Massillon.~|~04 - Reconstruction - No Added Capacity~|~2ACED280A6CE1FBB41AD751D000DBC553C4AACED 92854~|~1~|~1~|~01/STR~|~LAW SR93 23.05 Slide Repair On SR93, begin project 3.78 miles south of the Jackon County line. 80 Fed/20 State 01/STR/OT/State~|~21 - Safety~|~DC16E939DE97C54A1C1383088868FBD061CFEC11 126781~|~1~|~1~|~01/NFP~|~ODOT TID funding~|~01 - New Construction~|~BDCD0E57DE690FD335A761A9CD522CB83ADD3FC0 110008~|~1~|~1~|~01/NHS~|~Resurfacing on HAM-126~|~05 - 4R Maintenance - Resurfacing~|~C160590FB2DF5AC989C790C50BCABA08429698BD 110008~|~1~|~2~|~02/SAF~|~Longitudinal grooving in S curves~|~21 - Safety~|~7EF2807580A9A098311EC959AC4A39B812FC88EF 110008~|~1~|~3~|~03/NHS~|~Plan split for 100% locally funded cost to replace sidewalk blocks in Springfield Township on Winton Road with dyed concrete requested by the local.~|~17 - Construction Engineering~|~E8411FFA982438735FC015F3275831AD2F9D6DBD 113838~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~4A14A253AA16FC663B64EB8E7F7828D7179104AB 123681~|~1~|~1~|~01/NHS~|~plan spit for bridge work~|~10 - Bridge Replacement~|~94CD8818CED5D3B4DA6C7133BD3312FFE17ED74E 116465~|~1~|~1~|~01/MPO/FPAR~|~Upgrades to 14 signalized intersections including new controllers, new detection, interconnect and incorporation into a central based system.~|~21 - Safety~|~8581C3348F012845AED7D1F0167522ECBA25A524 116465~|~1~|~2~|~02/SAF~|~100% local funded for Winton Rd/Smiley Avenue/Cobblewood Plaza, Kemper Rd/Hanover Rd and Northland Blvd/Sharon Road~|~21 - Safety~|~1F5C0D2FB346282ED5A179E8C1F89FF19A3DF443 119988~|~1~|~1~|~01/NFA~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~2C94D8EBE9D31F5CE8ECFAE912B09584F558D13A 103719~|~1~|~1~|~01/SAF~|~Install fiber optic cable~|~44 - Other~|~463F63D5B148A374909B92C80C3A14E85440E697 110964~|~1~|~1~|~01/IMS~|~Construct new interchange and associated roadways on IR 71 at Big Walnut Rd (TR 109)~|~01 - New Construction~|~D40FEE808B94B42F49420C0A1981477B221A18FB 105745~|~1~|~2~|~02/NFP~|~Plan split for SR-282~|~05 - 4R Maintenance - Resurfacing~|~449A8D198F3542C71CAC74D53655F31C84048C2E 105745~|~1~|~1~|~01/STR~|~Added new split 1~|~~|~C7D58BEDE3BAFA37BB0A8C65359B9C429B318E4D 110786~|~1~|~1~|~01/CMQ~|~Construction of a 1 O' wide asphalt bike path.~|~28 - Facilities for Pedestrians & Bicycles~|~2CABC44A1EE16324E8E80C66BC9282034E08F210 79275~|~2~|~2~|~02/SAF~|~100% Local for the Alternate Bid Items~|~21 - Safety~|~7CEC36A8971B7D749C885AD23130F91FBB15E0AC 79275~|~1~|~1~|~01/SAF~|~Replacement of existing traffic signals on Perkins Avenue~|~21 - Safety~|~EAB8A6B48E636A220676DEC68FDD6C4FBA19FF52 114655~|~1~|~1~|~01/STR~|~Project to replace bridge CLI-28-0807 that carries SR 28 over Lytle Creek~|~10 - Bridge Replacement~|~2DE9006FD13CFE3F3C0950B61A01E09978D23966 115713~|~1~|~1~|~01/NFP~|~Established Plan Split 01/NFP/OT/ - District Preservation Funding 100% State (4PS7)~|~21 - Safety~|~F9A9B87AC3F39EFFC8EC9FA1C8D891FE6FB376CE 94233~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~B21F866521DF7E426F89BFE3AE495CABD984CE94 123628~|~1~|~1~|~01/NHS~|~Funding Split for NHS~|~05 - 4R Maintenance - Resurfacing~|~B6E10609D4FE3B193E6AAB1891F89451503FE4D3 112818~|~1~|~1~|~01/S5K~|~Marion Urban Area Plan Split: MAR-529-2.59-2.83~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C422077315922449C99E15448D8126C8794C314D 112818~|~1~|~2~|~02/STR~|~Rural Plan Split: MAR-529-2.83-9.29~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2579FDCC8ADC61F161A07892E13DDAA1191BD215 112818~|~1~|~3~|~03/STR~|~Bridge split for SFN 5103622 along MAR-529-0722 for replacement of exterior box beams, railing & concrete patching of the abutments.~|~13 - Bridge Rehabilitation~|~8A8EFABE8A4DBB5EF4E193914B6DCC9A39D31CCD 102750~|~1~|~1~|~01/STR~|~This plan split is for bridge repair on the rural route.~|~13 - Bridge Rehabilitation~|~598F8C59F9D9CFF2DF24B2EA9265B651A1E54FA5 105712~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7.~|~21 - Safety~|~3EF9690955DD4A5755A1882C4E2CB28AF47F5C7C 80467~|~1~|~1~|~01/NFA~|~Provide hike/ bike trail to connect Villages of Williamsburg and Batavia to Eastfork State Park and Harsha Lake using a combination of separate trails and shared use roads. Phase 1 is Village of Williamsburg to Eastfork State Park Campground.~|~28 - Facilities for Pedestrians & Bicycles~|~472C5CD330187EDBFD16E0B9A5DF69E28155CF6C 93550~|~1~|~1~|~01/BRF~|~Bridge over Grassy Creek~|~10 - Bridge Replacement~|~D9BE2FD52E4A61CB150DDBD63DEF9A7D871471EE 118540~|~1~|~1~|~01/NFA~|~added plan split.~|~21 - Safety~|~5A5929ADC2F0EECD545FDE9ED82A434E5F408ED8 101064~|~1~|~1~|~01/SAF~|~Close the east leg of Rozelle Creek Road at ROS 23 4.97~|~21 - Safety~|~9561F1D0D243A8D7339D0C464AA2ADD304B1A214 101064~|~1~|~2~|~02/NHS~|~Barrier replacement.ROS 35 3.64R (SFN 7101562)~|~13 - Bridge Rehabilitation~|~7FB1BA2A09F43C04675D2E267F159F7B834ADA2D 101064~|~1~|~3~|~03/NHS~|~Barrier replacement.ROS US 23 12.22.~|~04 - Reconstruction - No Added Capacity~|~544FB7E16BFC46EB1FBF589EF38F4F5B1E28419F 95819~|~1~|~2~|~02/NFP~|~Urban Paving ineligible items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~10EE4C7EB90B96EE888F044608E44B64422A1D64 95819~|~1~|~1~|~01/NHS~|~Urban Paving eligible items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A329802C030CDFAE2A3431BC8770889E2C032C2 112361~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~12C97AC9451408D6AB5B7D8ACFE04114F3365EAD 93604~|~1~|~2~|~02/IMS~|~Part 2 - LUC-75-3.01 SFN 4803183 Bridge redeck~|~13 - Bridge Rehabilitation~|~8D1741566043DF4916CA9BCB7D986EFB14905E56 93604~|~1~|~1~|~01/IMS~|~Part 1 - LUC-75 from SLM 2.75 to SLM 4.52~|~04 - Reconstruction - No Added Capacity~|~A392F150B7B8EA79017881A172DF73F2EDD8C568 112944~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~44 - Other~|~B5376CA18B6A13B2D3CA477E7D476BFF83BC292A 99448~|~1~|~1~|~01/NFP~|~Spot pavement repairs of various routes in ATB, MAH, TRU counties in District 4.~|~05 - 4R Maintenance - Resurfacing~|~932F7E44E7EACC64E16D667979E85332EADBB8C3 102693~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip-seal treatment. ATH 356 0.00-1.50 and VIN 356 0.00-5.97. Not on the federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~ACE0289E5F46A847BDE95A03EF8BA890F764B452 102693~|~1~|~3~|~03/NFP~|~ODNR Division of Wildlife project to include microsurfacing access road and parking area repairs at the Racine Ohio River Access in Meigs County. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~C9A3B133479CC858F846DB1E21CBF714DCF34618 102693~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip-seal treatment. ATH 356 1.50-4.77, GAL 325 7.28-14.21, HOC 180 0.39-7.35 and VIN 324 7.28-12.02. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~3EBAE8492AF0470054182E00D93C13BCBED741D5 110428~|~2~|~2~|~02/STR~|~Work to replace culverts designed under the project ALL SR 309-19.31/20.03/23.02, PID 105570 to be part 2 of the contract. All the funds from the District Preservation Program budget. No local funds.~|~04 - Reconstruction - No Added Capacity~|~A15074E75B742651FF7FD09B93C2EA5C44B2A3DC 110428~|~1~|~1~|~01/SAE~|~All the work in the project for the intersection improvements on SR 309 in Allen County at the intersections with Thayer Road SLM 18.19 and Napoleon Road SLM 22.33 are in this split. Construction Contract subphase funding is 100% federal funds from the Safety Program. Roundabouts are eligible for 100% federal funding.~|~21 - Safety~|~3CCD11DA9E0E567C10606894DB732A8476B63C9D 110428~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~0C3F0732C5A339302D70E49941A192904F96242B 106100~|~1~|~1~|~01/S<2~|~Columbus Urban Area Plan Split: FRA-674-1.99-2.07 & 2.26-4.68~|~05 - 4R Maintenance - Resurfacing~|~81816EA1ED632019DAEB1D6AC1463D3A88776878 106100~|~1~|~2~|~02/S>2~|~Urban Paving Plan Split: FRA-674-2.07-2.13 & 2.26-4.68~|~05 - 4R Maintenance - Resurfacing~|~CE1104D7339A11FDC39B97D4BCDB29539E9E0F98 100492~|~1~|~1~|~01/NHS~|~LAW 93 6.86-10.72~|~05 - 4R Maintenance - Resurfacing~|~4BA0F3B0650FB598BB0533AC0ECEDF1F719F4318 106508~|~1~|~1~|~01/S>2~|~Construction of roundabouts at the ramps of US Route 52 and State Route 243.~|~01 - New Construction~|~F4B3114CE234E7A70D4E8CD8BEE6C258174740A3 106508~|~1~|~2~|~02/S>2~|~Plan split to cover change order for median crossover.~|~01 - New Construction~|~F47FC2BF93E2892E099B933D6730E5AD75230C17 92017~|~1~|~1~|~01/NHS~|~Major Bridge Funds~|~13 - Bridge Rehabilitation~|~5E5A0787B5D6A178D018047077BE360633B09C9D 104887~|~1~|~1~|~01/NFA~|~District wide deck sealing project.~|~47 - Bridge Preventive Maintenance~|~F7907E982664426269DF43EA9422D0735D3C670C 107679~|~1~|~1~|~01/MPO~|~Resurfacing of Infirmary Rd CR-164 from SR 14 to SR 303.~|~05 - 4R Maintenance - Resurfacing~|~35F9C93C849E19066CDCCFD8969500F3803EA75B 90053~|~1~|~1~|~01/ENH/JOHN~|~"01/ENV/OT/JOHN" - Enhancement Project 4B37 (80% Federal) / 4BG7 (20% Local) - CAP of $312,200.00 federal dollars - Village of Johnstown Project Streetscape in downtown area.~|~44 - Other~|~4EBB6094FB0107B416BAC9D4AAC5BE63761B0EDB 117102~|~1~|~1~|~01/ENH/BKLK~|~"01/ENH/21/BKLK" - plan split for widening and construction of multimodal improvements along SR 79 in village of Buckeye Lake.~|~21 - Safety~|~EAD8C1D6E12F3BE916B8EF60AE5C727740BF17C6 117102~|~1~|~2~|~02/S50/BUCK~|~widening and construction of multimodal improvements along SR 79 in village of Buckeye Lake.~|~21 - Safety~|~D67EA409492EF141EB2C917BDBE2A6920E5032C2 121652~|~1~|~1~|~01/MPO~|~Concrete bus pads in the Downtown Business District of Columbus~|~44 - Other~|~DFE8133DABD6F89B3CC8E2EBD73803A17F7BFFB5 119215~|~1~|~1~|~01/NHS~|~NHS plan split~|~05 - 4R Maintenance - Resurfacing~|~66DA01E00028E29FF1A2DC3640A44A1D405FC2D8 119215~|~1~|~2~|~02/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~63E116FD373481D2AADFC6AD42DAC804B16D2D05 119215~|~1~|~3~|~03/S>2~|~Columbus urban area plan split.~|~05 - 4R Maintenance - Resurfacing~|~2D65799B6E6B034BCD4CA9C18F2FA788A09B5B95 110985~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~96DDACD4936268585E0E6DCD8F14F2AD8DA9B3E9 113126~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment.~|~21 - Safety~|~A1EBBAC174EAA332BEDB5094969469E46A3FAC56 117928~|~1~|~1~|~01/NFA~|~NEVI Phase 1 -77-C~|~63 - Electric Vehicles & Charging Infrastructure~|~370E8E5F6B0A8342264FB0E6F69D254778CB3F35 116424~|~1~|~1~|~01/MPO~|~Plan Split - All work to resurface Luckey Road.~|~05 - 4R Maintenance - Resurfacing~|~5FE50F56B1E4C1C4EB6AD219DE73CE45475BDEB4 116424~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope item - asphalt rejuvenating agent~|~05 - 4R Maintenance - Resurfacing~|~2C43A2B0A71F149A12F37D191225025A8038BEB5 83443~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~10 - Bridge Replacement~|~770ADD593AD88AC91995B9ACB124B873DBA29021 97621~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 160 11.55. GSM funds. Rural other federal aid system, funded 100% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6B0EEFD0E2489FC0D11E84714181A10628B9952D 106311~|~1~|~1~|~01/MPO~|~Maple Avenue from Dayton Yellow Springs to Doris. Widening to 3 vehicular lanes and 2 bike lanes. Mill and resurfacing and full depth pavement repair as needed. New curb, gutter, and storm sewer system.~|~21 - Safety~|~D8594ECC3A20271CB5E3A165285887E621EA94B5 106311~|~1~|~2~|~02/NFP~|~Plan split for 100% local utility improvements.~|~43 - Utilities~|~B3E1879FA434584164B5396F5297D0CE3762C985 101460~|~1~|~1~|~01/STR~|~DSR# TUS-002~|~04 - Reconstruction - No Added Capacity~|~00E242BBCB71FDAD1E35D692AC09C2F8B1B2C352 114466~|~1~|~1~|~01/STR~|~CEAO STP funding for pavement markings~|~21 - Safety~|~4DC8F4BFECECCD0D367E25EC83AFF9C21725FF8F 114466~|~1~|~2~|~02/S5K~|~Plan split for urbanized area (5k-49k)~|~21 - Safety~|~C2C609024E7BED96676E0C964F430F21D8092591 97422~|~1~|~1~|~01/STR~|~Replace three culverts, two in COL county and one in HAS county. COL-170-19.43, COL-172-6.27 and HAS-151-4.16~|~04 - Reconstruction - No Added Capacity~|~075FB018137FD84FC36C6005010CAAAD0C0EF5A7 117836~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 1004 2.27, SFN 5634857. Work includes abutments and approach work.~|~10 - Bridge Replacement~|~C08F2B42758379C68B6E572B2E5B3730658D4181 114535~|~1~|~1~|~01/NFP~|~D09 Culvert Project FY27~|~99 - State Preventative Maintenance~|~B9577E081346BB8708E97CA63D2942EA638F7CCE 100808~|~1~|~1~|~01/IMS~|~Overlay, replace barriers and add a sidewalk to bridge HAM-275-3188 (Cornell Rd over I-275) Replace deck of bridge HAM-275-3270 and incorporate a sidewalk.~|~13 - Bridge Rehabilitation~|~E45AA030067B7AC444468292053A227786F0492B 90568~|~1~|~2~|~02/NFP~|~This funding event is for painting the parking stall markings at the county garages and at the district complex using 4CP7 funding sac.~|~21 - Safety~|~1086926F09C39043A309733C8328EDDD7F5ADEC5 90568~|~1~|~1~|~01/NFP~|~100% State funds (4MP7) for district wide auxiliary pavement marking~|~21 - Safety~|~EAE61489D7337F8471643665352EA5C8520EF99E 107364~|~1~|~1~|~01/STR~|~District Preservation Pavement Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Spot Paving and repairs on selected OFAH-Rural Roadways in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB632191B6A81C7B7061F31CF3BF247B5A2119CF 107364~|~1~|~2~|~02/NFA~|~Plan split 02/NFA/PV/ - 100% State (4PS7) for Per-668~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~616BCA231B1D8E4499D786B64B19ACDF14D15156 113167~|~1~|~1~|~01/S>2~|~Roadway mill and fill resurfacing and thermo striping on: CR24-9.65 to 11.80~|~05 - 4R Maintenance - Resurfacing~|~1C90ECDCAE0AE12C522E26D1088529A375E1AE33 122869~|~1~|~1~|~01/NFP~|~All truck parking construction work to be included in this split.~|~44 - Other~|~0961306A3E9C06762C859A743825530EC3BA5220 93197~|~1~|~1~|~01/STR~|~Generaly system paving of:MAR-309: 22.52-26.88MRW-309: 0-2.48MAR-309: 26.88-29.30~|~05 - 4R Maintenance - Resurfacing~|~967C8700208ECEE474BC84B2FED6E2381A5D3E9A 97732~|~1~|~1~|~01/STR~|~Spot paving locations throughout Holmes, Tuscarawas and western Carroll Counties.~|~05 - 4R Maintenance - Resurfacing~|~999DC62D7E06F59A5C1DD6DD78B672453E650EF8 90817~|~1~|~1~|~01/NHS~|~4801393 LUC US24 13.98 Intersect: Fallen Timbers Ln C-2089 4802616 LUC SR65 0.83 Intersect: Csx Railroad; 4802667 LUC SR51 3.32 Intersect: Swan Creek~|~13 - Bridge Rehabilitation~|~DE2A4E1B1C7A0FDA387871B293180F78C1185132 120430~|~1~|~1~|~01/STR~|~Plan Split 01/STR/OT - 100% State~|~21 - Safety~|~FB699E37C70B6A3641576D54FC4BF4B08FBD9AFB 92414~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing with asphalt concrete on parking areas at CLA George Rogers Clark Park at the Interchange of SR 4 and SR 309.~|~05 - 4R Maintenance - Resurfacing~|~89A6D81E644D842D5728EB26881264558207B04C 116992~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban locations~|~05 - 4R Maintenance - Resurfacing~|~5CF3123AE911FACF504DF8D19045E17261E5EA89 107061~|~1~|~1~|~01/ENH~|~Plan Split~|~28 - Facilities for Pedestrians & Bicycles~|~3AFFFBA29EB953C78D09ED14485FA0948FDC129D 100599~|~1~|~1~|~01/STR~|~Resurfacing JEF-250 from SLM 0.00 to 2.51 and HAS-250 in the village of Harrisville.~|~05 - 4R Maintenance - Resurfacing~|~8F9587D77DB870DB83930B9600697B58CFB7E6F1 114846~|~1~|~1~|~01/STR~|~Plan split for resurfacing~|~05 - 4R Maintenance - Resurfacing~|~E5CE41E8333B58D5FDD0517E1D457C81C9F3009A 124626~|~1~|~1~|~01/IMS~|~Plan Split for replacing the existing 4 lane portion of PRE-70~|~04 - Reconstruction - No Added Capacity~|~C4CC7123BCBE4FE2EADF04488D603D8216506377 124626~|~1~|~2~|~02/IMS~|~Plan Split for the new added lanes on PRE-70~|~03 - Reconstruction - Added Capacity~|~2E5248B4062A5F5C71E2531281870E4783CC7080 124626~|~1~|~3~|~03/IMS~|~Plan split for bridge work~|~13 - Bridge Rehabilitation~|~36EDA56511E861CBE68B0E05C3812179CA823FA1 105686~|~1~|~1~|~01/IMS~|~District Preservation Program~|~44 - Other~|~35994B367F780E915190703132553AC37CDC7521 126022~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~66 - Resilience Improvement - Highway Project ~|~D09996FC9EFA0D99EBD33073068D4E48ECB8A4BE 96715~|~1~|~1~|~01/NFP~|~ODNR funded project. Resurfacing and culverts at HOC Hocking State Forest. Non federal aid project funded 100% state.~|~44 - Other~|~06B79B84F8ABCDC755D60C97A2DC6C9D7EB543FC 100953~|~1~|~1~|~01/NHS~|~This plan split is for all work in the project. There are no federal funds used. All funds are 100% state funds from the District Preservation Program budget.~|~44 - Other~|~15030262E6EE7957ACF5D6C3814F07AAC69F0BB5 80736~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1813102, 1813110, 1806327, 1806343, 1806351~|~~|~5743D9379FEC986B887035DA6C7D95D8B835D6BD 112884~|~1~|~1~|~01/STR~|~MAD-40 from 0.0 to 6.64 - A roadway and miscellaneous items associated with project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3AC2AF5ABD4A541339B6CC39CB35E3A964F00F4E 112884~|~1~|~2~|~02/STR~|~Replace culvert (structure) MAD-40-5.899 over Roberts Ditch SFN 4900782~|~04 - Reconstruction - No Added Capacity~|~494D2E61B4EA7CBED7A8B9E7E9446EC72D82B1F2 93161~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 6002463 MUS IR70 4.6 Intersect: I-70 Under CR 34 Ridge Rd; BR Eligible for Rehabilitation: Length=283 SD/FO(2) SR=66.5 DSR=6~|~13 - Bridge Rehabilitation~|~3D17E3C32E0E57FF6199C64B11C1213F4AE575EF 110666~|~1~|~1~|~01/STR~|~Resurfacing of TRU SR 46 from 18.45 to 23.64.~|~~|~CCB630358A579779D0490EAAFA7CD52443E4FAED 110071~|~1~|~1~|~01/NFP~|~Bridge Operation plan split~|~21 - Safety~|~CF7D6EB976648450A403A2546D233EF3E4A39114 109290~|~1~|~1~|~01/NFP~|~ODNR resurfacing project at Pike Lake State Park.~|~05 - 4R Maintenance - Resurfacing~|~28F97946FB95EB5B01164BBB7C8CEABADAA7F5D6 94407~|~1~|~2~|~02/S>2~|~This split is for the work on SR 20A @ Whitehouse-Spencer Road. Install Roundabout~|~04 - Reconstruction - No Added Capacity~|~CDFEFC45DFE19A46B53659D9271DB0DDDB5D730D 94407~|~1~|~3~|~03/S>2~|~Funding for 8' X 5' Box under Whitehouse-Spencer roundabout. State Bridge Only~|~04 - Reconstruction - No Added Capacity~|~93727157ACEDAB12888F9441B853D7CA7AA4D5AC 94407~|~1~|~1~|~01/NHS~|~This split is for the work on SR 20A @ SR 295. Install roundabout.~|~04 - Reconstruction - No Added Capacity~|~A27FDFF447B16153F6D5703E02F9957C70274B0C 122927~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~57F20F5D7C67A8A45401338DB82E9DF2E05E2059 84685~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds for the District budget SAC 4MP7.~|~21 - Safety~|~B17006D671F41DDA88AB39C704B2BE5ACE64EFB8 95245~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 83 0200, SFN 6101623. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~8545113AB5B0C9D39D8716FE4128AA0DA72B8E48 94659~|~1~|~2~|~02/NFA~|~TR-128 from TR45 to TR81 TR-45 from TR128 to SR18 TR-129 from CR46 to TR135 TR-135 from old SR18 to new SR18~|~05 - 4R Maintenance - Resurfacing~|~09E5229D8FF328F96D20E3584C345DFFB0BE6D33 94659~|~1~|~1~|~01/STR~|~SR-18 in North Baltimore from SLM 11.57 to SLM 12.40~|~~|~AFE228424D07364A6CC1167246F752B355458FB0 98426~|~1~|~2~|~02/S<2~|~Asphalt resurfacing 80%/20% Federal/State. Location is MEG 833 0.35-2.79.~|~05 - 4R Maintenance - Resurfacing~|~3F99D4A83BAC6F0289AF71DA1C9F239679D59820 98426~|~1~|~1~|~01/S<2~|~Install Culvert and storm sewer at MEG 833 0.20-0.25 location. 80/20% Federal/State.~|~01 - New Construction~|~F52A815992E1E1180441E88C8B730CCFD9FBBF2C 109531~|~1~|~1~|~01/BRO~|~Bridge repair plan split~|~13 - Bridge Rehabilitation~|~BE9CA1A84AC709D2A96C42D2D1011BEA356A9E8A 111383~|~1~|~1~|~01/S<2~|~Work on structures MAR-4-11.63 an MAR-4D-0.74~|~13 - Bridge Rehabilitation~|~849ACD401E332037167F37791825B89E1A30AB78 111383~|~2~|~2~|~02/SAF~|~SR 4 & 4D signals on State Street & Prospect Street, respectively.~|~21 - Safety~|~B86DF4BEE61903EFE5E1216E1DB635F9690FD524 127098~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~A43CE07A480036EE0C54FB2897847D54E4A3567F 107501~|~1~|~1~|~01/NFA~|~Full Depth Reclamation (FDR) of SR 179 pavement~|~04 - Reconstruction - No Added Capacity~|~84D2E0930DA155789F276FBA1096B51AA33E6634 94528~|~1~|~1~|~01/IMS~|~Rockfall Maintenance project. NOB IR 77 10.72-10.83. Interstate route funded 90% Federal/10% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F6D04E691F1AA328E92F268CCA4BC8F2FDA9920C 120986~|~1~|~1~|~01/STR~|~Culvert Replacement GAL 218-4.81/8.60~|~04 - Reconstruction - No Added Capacity~|~BB5E9351F1F3101C0B09362FB928EADDEB0F4A0A 123348~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~21 - Safety~|~15E9A412FFCF220A37DF16D807F05D296E7EA0EE 25521~|~1~|~1~|~01/IMS~|~WOO IR75 19.91-26.09, now 100% state~|~03 - Reconstruction - Added Capacity~|~485421DFF81C13E562BC91119D82888F6E0B2651 25521~|~1~|~2~|~02/IMS~|~SFNs: 8706514 & 8706816~|~13 - Bridge Rehabilitation~|~902A8796E24CB0809EA8EDB923BEC16602B4BED9 25521~|~2~|~3~|~03/IMS~|~New pavement to eliminate weave~|~04 - Reconstruction - No Added Capacity~|~C7E944F0EAAAFE62A42B31D19D7E7FAF0FC13D29 25521~|~2~|~4~|~04/IMS~|~New bridge SFN 8706530~|~08 - Bridge - New Construction~|~CFF0082FB44FBE3755FFF41DE1FB7216806F3860 110282~|~1~|~1~|~01/STR~|~Jack and Bore Culvert Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C40ECE7920002F3860C128D80C311FAEEFD63EBB 98206~|~1~|~4~|~04/NHS~|~"04/NHS/OT/ " District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on NHS Routes for: COS-36-(26.49 to 33.59), COS-16-(0.00 to 8.93), GUE-22-(10.28 to 31.04), MUS-16-(0.00 to 6.41), MUS-16-(11.74 to 14.86)~|~21 - Safety~|~424C53E13FD6812F1A666834259685616574CAD1 98206~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Fast Dry Pavement Markings on Interstate Routes for: GUE-70-(0.00 to 28.48), GUE-77-(2.51 to 17.70), MUS-70-(1.46 to 27.35)~|~21 - Safety~|~4EB037555F963A8F6B15CECE31893188109D30C2 98206~|~1~|~2~|~02/S<2~|~?02/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry PM on OFAH-Urban for: COS-36-(16.14 to 18.95), COS-83-(7.99 to 8.59), COS-83-(12.75 to 13.67), GUE-22-(9.28 to 10.28), GUE-40-(9.40 to 11.99), GUE-209-(7.07 to 7.64), GUE-209-(10.71 to 14.76), GUE-660-(4.05 to 6.33), GUE-821-(3.40 to 5.94), MUS-22-(1.17 to 9.76), MUS-22-(13.27 to 19.78), MUS-40-(5.10 to 9.15), MUS-60-(11.96 to 15.02), MUS-60-(21.77 to 25.08), MUS-93-(12.78 to 13.92), MUS-345-(1.60 to 2.52), MUS-555-(8.60 to 11.44), MUS-666-(1.78 to 4.85), MUS-719-(0.00 to 0.61).~|~21 - Safety~|~8B8B752A4AA83122C632F3160F4DC226E754ACE4 98206~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry PM on OFAH-Rural for: COS-36-(0.00 to 16.14), COS-60-(0.00 to 7.58), COS-60-(7.71 to 14.52), COS-79-(0.00 to 12.37), COS-83-(0.00 to 7.99), COS-83-(8.59 to 9.02), COS-83-(13.67 to 26.68), COS-93D-(0.00 to 0.28), COS-93-(0.00 to 22.67), COS-229-(0.00 to 0.70), COS-541-(31.59 to 34.62), GUE-40-(11.99 to 16.21), GUE-83-(0.69 to 11.29), GUE-146-(0.00 to 9.92), GUE-265-(0.00 to 4.59), GUE-513-(0.00 to 14.74), GUE-541-(0.00 to 8.32), GUE-658-(0.00 to 11.07), GUE-800-(0.00 to 2.48), GUE-821-(0.00 to 0.47), GUE-821-(0.60 to 3.40), MUS-22-(0.00 to 1.17), MUS-22-(19.78 to 27.63), MUS-40-(1.08 to 5.10), MUS-60-(0.00 to 11.96), MUS-60-(25.08 to 35.51), MUS-83-(0.00 to 14.98), MUS-93-(13.92 to 30.97), MUS-93-(31.28 to 34.58), MUS-146-(0.00 to 2.21), MUS-146-(25.78 to 33.76), MUS-345-(0.00 to 1.60), MUS-555-(4.02 to 8.60), MUS-586-(0.00 to 4.63), TUS-93-(0.00 to 0.49)~|~21 - Safety~|~A34DB82DDB98C9DFE97B93E537E525226F7D457D 98206~|~1~|~5~|~05/NFA~|~"05/NFA/OT/ " District Preservation 4PS7 (100% State) - No CAP - Fast Dry Pavement Markings on NFA Routes for: COS-206-(5.87 to 6.52), COS-662-(0.00 to 0.42), COS-715-(0.00 to 2.54), COS-715-(3.19 to 8.14), GUE-209-(0.00 to 7.07), GUE-285-(9.47 to 13.46), GUE-313-(0.00 to 1.24), GUE-340-(0.00 to 0.86), GUE-660-(0.00 to 4.05), GUE-662-(0.00 to 7.27), GUE-672-(0.00 to 2.74), GUE-761-(0.00 to 2.43), MRG-555-(26.73 to 27.16), MUS-208-(0.00 to 11.19), MUS-209-(0.00 to 1.64), MUS-284-(0.00 to 13.36), MUS-313-(0.00 to 7.13), MUS-340-(0.00 to 3.64), MUS-555-(0.00 to 4.02), MUS-662-(0.00 to 0.45), MUS-666-(4.85 to 14.17), NOB-340-(0.00 to 0.71), NOB-672-(0.00 to 0.37)~|~21 - Safety~|~40C1D43EB7EFA25667DBCD6BFA796EF5FEEFDD18 106247~|~1~|~1~|~01/NFA~|~The County will realign, widen and reconstruct 688 feet of Mill Street and 213 feet of Supreme St, construct radii improvements to the intersections of Larchmont Ave and Mill St and North River Rd and Supreme St.~|~01 - New Construction~|~8CAFC577AFB2AABD61417A638D8A2264A3698A0A 122981~|~1~|~1~|~01/BRF~|~Plan Split for Municipal Bridge funded bridges~|~10 - Bridge Replacement~|~BD5C9690761ED5E484341A19AD0D6DDD38D5E39C 110825~|~1~|~1~|~01/NHS~|~Rock fall remediation~|~07 - 4R Maintenance - Relocation~|~9F800511FB476AC7B651A183333EBC9AA9EA6BFC 96338~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Bridge replacement on 6006515 MUS-666-4.49 Intersect: Over Ditch; Not BR Eligible: Length=15 SD/FO(1) SR=48.6 DSR= 6;~|~13 - Bridge Rehabilitation~|~4E7DB475CA52578FBE1190DE750C4F6880221E42 100026~|~1~|~1~|~01/MPO~|~80% federal pariticipation with a 20% local matching funds for eligible streetscape work items.~|~28 - Facilities for Pedestrians & Bicycles~|~20A7DB1B9D5744E848B68C7AD64EC4CC001179C7 106411~|~1~|~1~|~01/SAF~|~Ramp improvements at the I-275 & US-42 interchange; Re-assigning lane usage on US-42 through interchange and at Hauck Rd~|~21 - Safety~|~C19057ECBE341E9828C39607DB07C2D6107B14F1 106411~|~1~|~2~|~02/SAF~|~Replacement of an existing CCTV camera.~|~21 - Safety~|~07D4910086B7CF63C18BE53E676CAD394D1F833E 106411~|~2~|~3~|~03/MPO~|~Widening of Hauck Road (from just west of the Norfolk Southern crossing to 500' west of US-42) to three lanes to add a center two way left turn lane. In addition curb and gutter will be constructed, replacement of the storm sewer system and construction of a sidewalk on the north side of Hauck Road.~|~21 - Safety~|~B658B412AB3A5C9F61AF4ABAE70259755FE8B0F0 106411~|~2~|~4~|~04/MPO~|~Plan split for the construction of sidewalk along Hauck Road for the length of the project.~|~28 - Facilities for Pedestrians & Bicycles~|~E26C9BD339904A1A8B2ADEA85AB6D7BD99AAE0BC 106411~|~2~|~5~|~05/SAF~|~Widening of Hauck Road to three lanes to add a center two way left turn lane. In addition curb and gutter will be constructed, replacement of the storm sewer system and construction of a sidewalk on the north side of Hauck Road.~|~21 - Safety~|~02C574B628A2C59ADB35847DBB7CA4516FFA3BBC 106411~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~3372216B005D49303C530DD42EC1FA225444B963 119181~|~1~|~1~|~01/NHS~|~Plan split for LUC-20-0388 bridge~|~13 - Bridge Rehabilitation~|~F66847E9ABCC049CC492C053B33D41C38E717C72 109047~|~1~|~1~|~01/NFA~|~Rehabilitation project of a historic covered bridge. WAS Hills Covered Bridge, SFN 8430799. TAP funded project using Toll Revenue Credit.~|~13 - Bridge Rehabilitation~|~3C661BB667DD7B316A7E37C0D6B36FA0934EA050 116638~|~1~|~1~|~01/NFP~|~Signal Replacements.~|~44 - Other~|~B1B9D198E1A10FD5A6E90E4960B9E85D61F71DA4 116638~|~1~|~2~|~02/SAF~|~Install supplemental signal heads on SR 4 at US 20.~|~44 - Other~|~F7A01469E2C306A1CF4B93E0960846721ABDAE37 94238~|~1~|~1~|~01/IMS~|~AC overlay with repairs on:HAM-75 SLM 0.22 to 0.90HAM-75 SLM 0.90 to 2.39~|~99 - State Preventative Maintenance~|~3E238E2284ED4B454B495064308BE2CCE304FA88 94238~|~1~|~2~|~02/IMS~|~Plan Split for Bridge work~|~13 - Bridge Rehabilitation~|~FB3E0AFCA05DA0CEEA6D309607D2050027A71C29 119861~|~1~|~1~|~01/S5K~|~All Work Included in this Split~|~66 - Resilience Improvement - Highway Project ~|~A8242F6B5920EAC1760F44D73EB27F66ECBA1AEC 112913~|~1~|~1~|~01/STR~|~Resurfacing SR 170~|~05 - 4R Maintenance - Resurfacing~|~541A0379064DD33C3930B775586B666F4C824B49 89254~|~1~|~1~|~01/BRO~|~4863119 LUC WHEEL 0.24 M. N. OF STARR AVE.Intersect: OTTER CREEK~|~10 - Bridge Replacement~|~C337DD28AB514064D67D0D18880A5CFA8A800571 103275~|~1~|~1~|~01/NFP~|~Sign replacements on various routes throughout MAH, POR and SUM Counties.~|~21 - Safety~|~033797937F23CF8F9213644B9E07AA23C595A19E 98447~|~1~|~3~|~03/SAE~|~Safety application for stop bar and advance radar detection on all 4 approaches of the HUR-224/61 intersection . ~|~21 - Safety~|~E066DA2034F1833B4BF282F7B2AF9EBAE5BD05C9 98447~|~1~|~2~|~02/NHS~|~Bridge maintenance work on 7 linked bridges. ~|~13 - Bridge Rehabilitation~|~46A03DAB9FCF1E35673BB31F25C8F9C351CC7EB3 98447~|~1~|~1~|~01/NHS~|~Hur-224 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~58D6D9FAEA80A821389014A14DE450AA0D9A82DD 98788~|~1~|~1~|~01/NFA~|~Micro surface the existing parking lot and entrance drive at Johnston Farms.~|~44 - Other~|~27AB1453823C36FDC174252B59956D52E96F4272 105137~|~1~|~1~|~01/IMS~|~Mill and fill FRA-270 Mainline from 29.39 to 31.60Mill and fill FRA-270 CD lanes from 30.60 to 33.58~|~05 - 4R Maintenance - Resurfacing~|~8592BA437FC3782348771366376760743380856E 110584~|~1~|~1~|~01/STR~|~RESURFACING SR-41 SLM 22.18 TO SLM 24.45. RESURFACING SR-734 SLM 4.43 TO 5.22.~|~05 - 4R Maintenance - Resurfacing~|~F178AC38F40412E4C5229DBC997BA5023D660763 110584~|~1~|~2~|~02/NFA~|~RESURFACING SR-729 SLM 9.67 TO 10.51.~|~05 - 4R Maintenance - Resurfacing~|~10DFD789C427003D5BAFD7CFCB1045DA365BB83A 110584~|~1~|~3~|~03/STR/Jeff~|~Pavement repair and guardrail replacement to be paid 100% by the Village of Jeffersonville using OPWC funds~|~05 - 4R Maintenance - Resurfacing~|~F7B80CA73F331670D66A8108C88C1F40D6B7F0ED 113016~|~1~|~1~|~01/ENH/STOW~|~Construct 10' wide asphalt hike and bike trail between SR 8 and Springdale Rd in the city of Stow.~|~28 - Facilities for Pedestrians & Bicycles~|~255EFB1BF7AAC53A6AA035D050F49694B8D870E1 119743~|~1~|~1~|~01/NFP~|~Creating Plan Split for TED Involvement~|~~|~579293C72CD5DA15798B2E68C57C5CAE183121E1 101500~|~1~|~1~|~01/STR~|~DSR# BEL-019~|~04 - Reconstruction - No Added Capacity~|~49795DD42F42495938133F7348DEE6470B4ADC7C 93979~|~1~|~1~|~01/S>2~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2013-2014 used for Construction Inspection services.~|~17 - Construction Engineering~|~190ABC637FB9C2C5656723FE66DA9D2A42BE9C32 103262~|~1~|~1~|~01/SAF~|~District wide fast dry pavement markers.~|~21 - Safety~|~E141120AA871DE5469AEE47113FDB12FA9E70AD1 102839~|~1~|~1~|~01/NHS~|~Resurfacing on NHS System.~|~05 - 4R Maintenance - Resurfacing~|~3B65854A8C42E43B80F9AE1662C3E643EB51242F 102839~|~1~|~2~|~02/S<2~|~Plan Split for STP<200000, MAR-95~|~05 - 4R Maintenance - Resurfacing~|~A13226D46E97D218479F89B7C90CA6513C0212A3 102839~|~1~|~3~|~03/STR~|~Plan Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~28639FA374ACA5FC0D1DC6B5170F3662B8ECC69C 102635~|~1~|~1~|~01/STR~|~Bridge Deck Replacement: CRA-19-26.18 (SFN 1700855)~|~13 - Bridge Rehabilitation~|~5C009B84ED21A8461FF2162828038621D53178C2 116538~|~1~|~1~|~01/IMS~|~Culvert Replacement Project. NOB-77-11.97 CFN: 1886097 and NOB-77-13.574 CFN: 1875682~|~04 - Reconstruction - No Added Capacity~|~B7C6053FDC81EFA82F63D858B418E090FEA7A4E4 113758~|~1~|~1~|~01/SAF~|~Retrofit various traffic control items on FRA-33-4.36 to 8.79 and MAR-23-15.22 t0 15.27~|~21 - Safety~|~E95CDE275D540676C969D2CD24320E0F849FB319 102788~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CY 2022. Funded 100% state.~|~21 - Safety~|~C9CE0F2EE985CF92E061B369FF7E7B063F3C3856 109300~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail~|~21 - Safety~|~56EF55BB5C5CB086166AFFD6670A208950654569 114789~|~1~|~1~|~01/STR~|~Rural plan split for the following sections: DEL-47-0.00-1.07 MAR-47-0.62-2.45 UNI-47-13.55-15.00~|~05 - 4R Maintenance - Resurfacing~|~371F30BF40B988BDB42D23F84FBBCC8DA359DEEE 109619~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Replacement of School Flashers at various locations on NOFAS-Rural locations.~|~21 - Safety~|~A86CAB7083D4ED812F3DAC49870859CD605C1C1B 112133~|~1~|~1~|~01/BRO~|~All the work in this project to replace the bridge deck and do other bridge work. Federal and state funds from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~50E9B05BBC23A80FE80DD2C362CF7C2591858A3D 117485~|~1~|~1~|~01/NFA/ASCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~D0AFC1C144841866D15B0CB4CDC2977BB9FBEFE4 111032~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP) - Replacement of the deficient bridge (SFN 3004058) which is BR Eligible: L=848'; SD/FO (1); DSR 4; SR 58.2~|~47 - Bridge Preventive Maintenance~|~DE881B181D4B9AD123A8515B0529FC2CD631BE53 97197~|~1~|~1~|~01/SAF~|~Safety/Local funding to reconstruct signal and convert RTL to through lane EB from I-270 through McNaughten~|~21 - Safety~|~59E5159EC851AF2A06947B844FBF78F6E062C1C0 125776~|~1~|~1~|~01/S5K~|~Plan split for rehab of CLI 68 15.33 structure ~|~04 - Reconstruction - No Added Capacity~|~F2838611A6ED0155646248A8352640523ECA0AEB 119449~|~1~|~1~|~01/BRF~|~CEAO 100% LBR funding~|~10 - Bridge Replacement~|~640A1497E899FD7DC7D92D3EA1DB6CE4DF3F65BF 117450~|~1~|~1~|~01/SAF~|~Plan split for Franklin County ding and dent guardrail on various routes.~|~21 - Safety~|~9A7D93312D1B1F7BF868CA3DDCC32412E1D3E6A5 103080~|~1~|~1~|~01/NHS~|~This is for resurfacing of Covington Street (US 36) in Piqua~|~05 - 4R Maintenance - Resurfacing~|~1B11B05EF3DAEDF6A8CC19A579F5C695A1AA7691 98465~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~35CA55F0C57795F9BDB727153C855C13F5179031 116600~|~1~|~1~|~01/S>2~|~Columbus urban area plan split for resurfacing and resurfacing related items on FRA-40-4.43-4.69.~|~05 - 4R Maintenance - Resurfacing~|~9DD08A058D65FC8D72FC9838F0CC8E143170246D 112758~|~1~|~1~|~01/STR~|~Systemmatic Sign Replacement.~|~21 - Safety~|~BF0451062A69B7C4DEE921276162A4B273E83177 112758~|~1~|~2~|~02/SAF~|~Overhead sign support maintenance.~|~21 - Safety~|~B110734BD65E0E7CE0F2625EBC970510769E4754 120035~|~1~|~1~|~01/S5K~|~Intersection Improvement~|~21 - Safety~|~3976562C9FA9FF0D280BB27F27A1BAFC3DFC4F4C 97627~|~1~|~3~|~03/BRF~|~Replace MAD-TR 48-1.45 (Goodson Rd) structure over Lucas Ditch SFN 4932110~|~10 - Bridge Replacement~|~22B42DC276AB84E149C1E5D3ACC5040B177F5CE9 97627~|~1~|~2~|~02/BRF~|~Replace MAD-CR 84-2.51 (Van Wagner Rd) structure over Bradford Creek SFN 4930576~|~10 - Bridge Replacement~|~66058F64C3109CB6B1147D69684482593B633FD7 97627~|~1~|~1~|~01/BRF~|~Replace MAD-CR 113-0.60 (Tradersville-Brighton Rd) structure over Georges Creek SFN 4931726~|~10 - Bridge Replacement~|~70181F92922CE2A0AEC0D7E8340C87E5273100D7 99828~|~1~|~1~|~01/MPO~|~Funding to cover construction of bike trail and bike lanes.~|~28 - Facilities for Pedestrians & Bicycles~|~20A34CA6922A0D591A5108CC1FC17DBBA6F76A90 114792~|~1~|~1~|~01/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~BD317F66AD48A875644E1B7435DAD041CB4CE9FA 114792~|~1~|~2~|~02/S<2~|~STP<2 plan split.~|~05 - 4R Maintenance - Resurfacing~|~4E12B4D8D5757181F756B12B395B60490079BE67 114792~|~1~|~3~|~03/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~20D9B77BE0732535630CDDB02FB073C1AF962DEF 100924~|~1~|~1~|~01/S>2~|~Widening of Kemp Road to three lanes from Grange Hall Road to Meadowcourt Drive. Addition of curb and gutter and storm sewer system. An 8' wide sidewalk will be constructed on the north side of the roadway and a 5' wide sidewalk will be constructed on the south side of the roadway.~|~21 - Safety~|~67636434550FA25506276DA11C2B14F796B7B9FE 121243~|~1~|~1~|~01/SAF~|~interstate lighting maintenance~|~21 - Safety~|~7EC1CC1D3374F4B50665DDEA765A2CC22463FC4D 107462~|~1~|~1~|~01/NFP~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~8BCE203EBDC15864524ABCE7B689EB86DEF0A53A 126441~|~1~|~1~|~01/MPO/LAKE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3F5C3933D6253C41AAC4AA42AA1CB17B607C2C35 90837~|~1~|~1~|~01/SAE/MtOr~|~It is proposed to construct sidewalks along Boyd road, Tri-County Road, Campus Drive, Western Ave., and between Campus Drive and Western Ave. so that children can safely walk and bike to and from school. 100% federal Safe Routes to School Program~|~44 - Other~|~E3209FBA33C9ED0968CB2C1A3F036BCFA2F9C7CC 96671~|~1~|~6~|~06/S>2~|~Resurface STA SR 93 from 4.13 to 5.84.~|~05 - 4R Maintenance - Resurfacing~|~4E604D3AA4A49F3151696C7094AD63081A4AD527 96671~|~1~|~3~|~03/STR~|~Resurface STA SR 93 from 0.00 to 3.36 and 3.72 to 4.13, Resurface STA SR 212 from 0.00 to 2.38.~|~05 - 4R Maintenance - Resurfacing~|~28BC4E50202CE22DD88ADD917420F84F6A504747 96671~|~1~|~7~|~07/S>2~|~Minor bridge work to linked structures >20' span.~|~13 - Bridge Rehabilitation~|~609C79D2744A69AC9DB6E9DFF3BE6F646E804BC0 96671~|~1~|~2~|~02/NHS~|~Minor bridge work to linked structure >20' span.~|~13 - Bridge Rehabilitation~|~AD6791149BBBCD4C5765A0E3BB6A2D60A6C8AEED 96671~|~1~|~4~|~04/STR~|~Minor bridge work to linked structures >20' span.~|~13 - Bridge Rehabilitation~|~024D1E5FC71787D29A1ACF3B77203F0515FA1371 96671~|~1~|~5~|~05/STR~|~Minor bridge work to linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~C981EAACE83E14E138E73DC2F55FBDCA70676929 96671~|~1~|~1~|~01/NHS~|~Resurfacing and rumble stripes on STA US 250 from 0.00 to 1.21 and 1.28 to 4.14.~|~05 - 4R Maintenance - Resurfacing~|~174A2BB93FC49D7091EDF47670AA9B7289410027 96671~|~1~|~8~|~08/SAE~|~Adding rumble stripes.~|~21 - Safety~|~2B6CC74F0CD96151658D2AB28844A24EE9252547 115598~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~7BE05386981C68D3C5221ECDDF4FD05570D859A2 105190~|~1~|~1~|~01/STR~|~Fine graded polymer asphalt resurfacing of US 62 and SR 39~|~05 - 4R Maintenance - Resurfacing~|~767DCC535AC1C2C0E8E8D844D8C3314DC956242D 86053~|~1~|~1~|~01/BRO~|~SFN 7760361 0.22 State St. over Ohio Canal~|~~|~881D0C6A94208ED6F418857E28A70F9E0E118C4E 103271~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay on GAL US 35 1693 L (SFN 2701324), R (SFN 2701359), and GAL SR 735 1.14 (SFN 2701383).~|~13 - Bridge Rehabilitation~|~2133FB876B617F8D81B90483C7C6B943488CF6A4 103271~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay on GAL SR 588 3.24 (2700840).~|~13 - Bridge Rehabilitation~|~9D3C16FEF0EAE6F6717AE62F541E0F250240922D 80113~|~1~|~1~|~01/NHS~|~Rehabilitate Bridge JEF-7-1348 (SFN 4100727) by replacing existing concrete deck with a new reinforced concrete deck, reapiring substructure and painting structural steel.~|~13 - Bridge Rehabilitation~|~34E794F57B8217D139937CFA3B7B40F3931E101A 80113~|~1~|~2~|~02/NHS~|~Funding event created for on-going services to be provided by Consultant during the construction phase of the rehabilitation of bridge JEF-7-1348.~|~17 - Construction Engineering~|~624CEA4C336589ED7FAE8A18BE3511A38D3248E1 122885~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~741181BA71A4C48C15FC0475FE40CE2DABCAE674 95769~|~1~|~1~|~01/STR~|~SAN-6 from SLM 23.43 to SLM 32.43~|~05 - 4R Maintenance - Resurfacing~|~2A7DDB0CC189668FBCB511996A304D0F7C4C8BFF 95769~|~1~|~2~|~02/STR~|~Bridge Split~|~13 - Bridge Rehabilitation~|~39D61FB4F6D7A9BE16931989C9DED8B286CCD34F 95769~|~1~|~3~|~03/STR~|~Split for SFN 7200846~|~13 - Bridge Rehabilitation~|~D90E7859F4FD45454388876D7DC630D36FA6368D 121306~|~1~|~1~|~01/S>2~|~STP>200,000 Plan split~|~05 - 4R Maintenance - Resurfacing~|~38429C214977CFF8B6B03AE912C20D1DADE3FF1A 121306~|~1~|~2~|~02/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~A578E0B16A98D8A3480950A9856A7B6245982F47 121306~|~1~|~3~|~03/S>2/COC~|~COC Plan Split~|~05 - 4R Maintenance - Resurfacing~|~7ACF0D30DA8DDE1174D36FCF6DF0846AAE672B5B 121306~|~1~|~4~|~04/S>2/DEL~|~City of Delaware Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4004C534A3C108AF9A03799AC73C66C7F44DD052 96322~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge replacement on 1602101 COS-SR 93-15.75 Intersect: Over White Eyes Creek; Not BR Eligible: Length=31 SD/FO(0) SR=70.7 DSR=6~|~10 - Bridge Replacement~|~7687377C4DC3E3A1067723A7AA45114EBCDE5063 127062~|~1~|~1~|~01/S5K~|~Roadway reconstruction ~|~04 - Reconstruction - No Added Capacity~|~93C6826B298CA78CE7BFA393013758AEDA3800F8 100392~|~1~|~1~|~01/MPO~|~Construction of a wooden covered bridge across the Stillwater River at the location of a demolished covered bridge on a section of abandoned roadway of National Road Bridge will provide and enhance access for the existing bikeway.~|~28 - Facilities for Pedestrians & Bicycles~|~213E7A4B932132986129B2F313E5122D2093E59A 117389~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~17 - Construction Engineering~|~6A5675AD3E5561C6659ECD25CCA1606804BA1A55 105210~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C002E0BF44BF60F0082C74EBC4199A97CE77F0B7 105210~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0A0D5DE539EB3409968E04E093A9309C725C8213 105210~|~1~|~5~|~05/STR~|~Bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~6BB5CE2C05A6ACC2067E1BC79688B783311F2178 105210~|~1~|~3~|~03/S5K~|~Bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~9395E7EFD0C9103CD410D7C63A5C442FAF566F2D 105210~|~1~|~4~|~04/STR~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~D4CAE93EEC8F5AE1A7358644E801869D947E8FDB 105598~|~1~|~1~|~01/STR~|~Bridge Repairs.~|~13 - Bridge Rehabilitation~|~BDEA4F85156BD74A138524DA693691A5DBA6B3E3 124264~|~1~|~1~|~01/ENH~|~Programming project.~|~28 - Facilities for Pedestrians & Bicycles~|~4F9055077A65D02626AB0846FF8648837811EE2B 115039~|~1~|~1~|~01/NFP~|~Split for work on Tower B~|~47 - Bridge Preventive Maintenance~|~548D68D982CB422BA1BF4CC2025926C5C9100B63 120055~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing Municipal Bridge (4R87) funds at 100% (Off-System Eligible) up to the Federal CAP.~|~10 - Bridge Replacement~|~39040271AE8BCA3CC6B33A22D17940C25935FF13 121025~|~1~|~1~|~01/NFP~|~culvert maintenance.~|~47 - Bridge Preventive Maintenance~|~2C16B5E5012A0FB790002492E55740025A70A28B 105253~|~1~|~2~|~02/STR~|~Bridge preventive maintenance >20' span.~|~47 - Bridge Preventive Maintenance~|~92A80801BE2856D443B403F10B83868B7D975AA7 105253~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9CC54B6AEB5D1DD7940770FED555CAD34697199B 96806~|~1~|~1~|~01/NFA~|~It is proposed to do a resurfacing and chip/seal at the Kincaid Fish Hatchery in Pike County.~|~44 - Other~|~0681DC75D8D355FB03351C5C125B66E76197B7F5 107970~|~1~|~3~|~03/STR~|~Minor bridge work to be completed with FDR project~|~13 - Bridge Rehabilitation~|~2C419D653A6A9BAB9FC3FDCE1A900C1F846F0A67 107970~|~1~|~1~|~01/STR~|~Full Depth Reclamation with Widening:ASD 545 00.00-05.46RIC 545 10.508-11.48~|~04 - Reconstruction - No Added Capacity~|~0E4836302BDC4CB5F5E94B3B1202AE493BA9E3F6 107970~|~1~|~2~|~02/SAF~|~Construction associated with installing Buggy Lanes~|~21 - Safety~|~B5FC1F855040769FC25C5AFF1F45C36C8CC4A2F7 82927~|~1~|~3~|~03/NHS~|~Plan Split for SFN 7606125 STA SR 241 04.22 over US 30~|~13 - Bridge Rehabilitation~|~04144B69D6EF27A07F98BFF87F6BADAAD7F94FFB 82927~|~1~|~4~|~04/STR~|~SFN 7606087 STA SR 241 3.96 over Pigeon Run.~|~13 - Bridge Rehabilitation~|~29A2A82163873D6D8F11A514BCF99551D47A5F9D 82927~|~1~|~6~|~06/S>2/MAS1~|~STA SR 241 from 6.01 to 7.86 (80/20 funding split)~|~05 - 4R Maintenance - Resurfacing~|~4FF591D9A4AEB097EEAB253FD89C1AB2B41980C6 82927~|~1~|~2~|~02/S>2~|~Plan Split for STA SR 241 from 4.16 to 6.01~|~05 - 4R Maintenance - Resurfacing~|~67C764B9CFF87583705F146ECB3891422036E5FE 82927~|~1~|~5~|~05/S>2~|~Plan Split for SFN 7606176 STA SR 241 07.66 over Tuscarawas River and Railroads.~|~13 - Bridge Rehabilitation~|~7ED1DA8C8BBD8A3FFD9615AD95D6D2F80A03DAD4 82927~|~1~|~1~|~01/STR~|~Plan Split for STA SR 241 from 3.64 to 4.16~|~05 - 4R Maintenance - Resurfacing~|~84048D665EF7A5CD91622570356DAFBB06136F88 82927~|~1~|~7~|~07/S>2/MAS2~|~STA SR 241 from 6.01 to 7.86 (100% city)~|~05 - 4R Maintenance - Resurfacing~|~DBEC00B6C6718CA29FF1888376C158963074793F 97734~|~1~|~1~|~01/NFP~|~Added due to moving subphase to CO Contract~|~21 - Safety~|~03B02F55749C0C03087D8BAAF0DB4A046AF7E76E 124544~|~1~|~1~|~01/STR~|~Reconstruction.~|~04 - Reconstruction - No Added Capacity~|~1CF8992772849A39F1CDC68B736C0AA045BD8EBB 123646~|~1~|~1~|~01/NFP~|~Plan split for brush and tree removal~|~99 - State Preventative Maintenance~|~CD28AB8818F3EB298CFD6E6A2B82808F80658A61 110068~|~1~|~1~|~01/NFP~|~Bridge Elec. plan split~|~21 - Safety~|~B0557FA4672FA8E68353F3C4437331D01CE06B9A 121110~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~45C5EA62D09CA8AF0489230D01D16B03132877F1 100864~|~1~|~1~|~01/NHS~|~ADA 52 13.10-16.14~|~05 - 4R Maintenance - Resurfacing~|~2A4EBF67E1F740DB4DA223F3DB97FC2CA36C75F3 100864~|~1~|~2~|~02/NFA~|~ADA 247 0.00-0.32~|~05 - 4R Maintenance - Resurfacing~|~035F67BBE952EBAD8FD60234324B4A993C9BE289 100864~|~1~|~3~|~03/STR~|~ADA 247 0.32-0.35~|~05 - 4R Maintenance - Resurfacing~|~845E89087104F638839D1531F47380D3F3B929AC 121456~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~65902E7E50B2CF8BC406E8FECD12EBC55C5516B7 121456~|~1~|~2~|~02/S>2/WARR~|~Resurfacing, urban paving in the City of Warren.~|~05 - 4R Maintenance - Resurfacing~|~4F061FFD596993F99072E3B37748784F6ED066D8 121456~|~1~|~3~|~03/S>2/NILE~|~Resurfacing, urban paving in the City of Niles~|~05 - 4R Maintenance - Resurfacing~|~B72EA75A7AC64DBE536EC9580F1FADF4E3F87E7F 116706~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~90FD4CB7F060FF0EBC21AF317C91F85D1F139416 116706~|~1~|~2~|~02/NHS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~02DCD0400B79775E0B79E8B80F5F627E0E7E9341 109961~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County.~|~21 - Safety~|~B14179E539AB351709E76775184CA4E58A52F111 93240~|~1~|~1~|~01/MPO~|~Streetscape which includes decorative pavers, new sidewalk, curb bump-outs, ADA ramps, new curbs, pavement and underground electric with decorative light poles on East Main Street from Walnut Street to Mulberry Street.~|~31 - Landscaping & Other Scenic Beautification~|~BA4D05B36EA4F819311BF2CC0244F0B98A59EDCD 110130~|~1~|~1~|~01/STR~|~Bridge ReplacementPIK CR 57 03.47 (SFN 6630715)~|~10 - Bridge Replacement~|~EF1E8259FECB585636F66A797599E77BEF4462C3 107017~|~1~|~1~|~01/NFA~|~The County will construct improvements on Urbana Rd between Tremont City Rd and Willow Road.~|~01 - New Construction~|~1A41D84B2CF0FF04A683CB4EDDDDCFC7FFC3F008 105931~|~1~|~1~|~01/SAE/MCEO~|~"01/SAE/OT/MCEO" - Muskingum County Engineer pavement marking project funded by CEAO with federal max of $150,000~|~21 - Safety~|~7EBF79A08FB6E99D777802DC2F290B63518C410E 124310~|~1~|~2~|~02/ERD~|~Plan split for earmark funding for W State St - Front St to Rawson Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~7FE1DDA380E9E4D64504E63EE6093C2177123F31 124310~|~1~|~1~|~01/S5K~|~Plan Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~F65FBA99D4B0F4C260F2D79057F10C0AD54ACC36 104919~|~1~|~1~|~01/NFA~|~Perry Township truck replacement project~|~44 - Other~|~C775B128A0BC9D4E62A2919DFCB966EF2686BE3C 118692~|~1~|~1~|~01/ENH/STPK~|~Bridge Replacement.~|~10 - Bridge Replacement~|~6575544185A257688D264DFA8680E873D02BFB75 125043~|~1~|~1~|~01/STR/CENT~|~Pedestrian improvements along SR 36 (Columbus Road) and SR 314 (Johnsville Road) in the Village of Centerburg.~|~28 - Facilities for Pedestrians & Bicycles~|~E5ED4C589304C7D33E76A51E928ABA6AB9B5952E 101512~|~1~|~1~|~01/SAF~|~Intersection realignment project. HOC 278 10.70/HOC 595 2.95.~|~~|~B459E8D4A82CAE398E8CA342851F5FFFE5BCCC22 115749~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving~|~05 - 4R Maintenance - Resurfacing~|~6FA37592B4B04CD0FF6F6B3E222A8C349266CD4D 115749~|~1~|~2~|~02/S>2/HAM~|~Plan Split for the 100% City items on the urban paving route~|~05 - 4R Maintenance - Resurfacing~|~49B6BCFCD9C97AB4F4536199899A6117DFCD9F8B 94536~|~1~|~1~|~01/NFP~|~100% State funding split using Geologic Site Management funds.~|~44 - Other~|~8D948B4032B31E790FF69280D4DFC48314795922 102486~|~1~|~1~|~01/NHS~|~Minor rehab of pavement for COL-30~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE61903C7F102223D01A78DE484288ED53481CEF 105273~|~1~|~2~|~02/S<2~|~Smooth seal on small urban routes: CHP SR 29 SLM 17.63 to 17.87~|~05 - 4R Maintenance - Resurfacing~|~3A61FAD80F3D9AF6E2DA6B36853A6D0037266091 105273~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CHP SR 29 SLM 15.72 to 16.63 & SLM 16.63 to 17.63~|~05 - 4R Maintenance - Resurfacing~|~70E75C0F6800A42742E8B5F6B586E8356366953F 109238~|~1~|~2~|~02/STR~|~HUR SR 0162 22.85-Replace culvert HUR SR 0013-06.01-Pave culvert invert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~60CA18353D27EDC6A75F79E43FB91E49C5A3DDAB 109238~|~1~|~1~|~01/S<2~|~HUR SR 0099 Culvert Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7C928DBBDEEEE9684B3C7D63F2319AFF7AA79A33 110406~|~1~|~1~|~01/S>2~|~FY23 Urban Paving on SR 747 in Springdale. This plan split is for the items paid by both ODOT and the City.~|~05 - 4R Maintenance - Resurfacing~|~A6AE6F7E1CAF1A733CE7B45E25953E33BBD93830 110406~|~1~|~2~|~02/S>2/SPD~|~This plan split is for all items to be paid 100% by the City.~|~05 - 4R Maintenance - Resurfacing~|~870D8D202FAE85AF57DAE76FD933C4B59D9994A8 110406~|~1~|~3~|~03/S>2/DAP~|~this plan split is for the section of roadway that falls outside of Springdale jurisdiction and into Glendale. to be paid 100% by ODOT.~|~05 - 4R Maintenance - Resurfacing~|~A62C57087151B2F72E7ADBAD9B3C1C5B4B1185FF 102737~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~F093FEF5AF725A78AC4E2455BE25153BC74700E3 102737~|~1~|~3~|~03/S>2/AKRO~|~Resurfacing, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~B515CAEE803AE7F34414185588D91BB2A670E244 102737~|~1~|~5~|~05/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~A58C530CB09C7716644836EE571E53FEE2E796F4 102737~|~1~|~2~|~02/NHS/AKRO~|~100% Akron items such as full and partial depth repairs and ADA curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~742A1FDDB9C7328268CF5536874FBDC7C09A55A0 102737~|~1~|~4~|~04/S>2/AKRO~|~100% Akron items such as full and partial depth repairs and ADA curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~1844F760E16A7CDE10667B86E8B0C4F7E67BA3EC 118112~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds~|~05 - 4R Maintenance - Resurfacing~|~DA37C10C1F64213F5578F44649E33DEC7DAA5A0E 118112~|~2~|~2~|~02/SAF~|~Plan Split for Safety-funded scope to add raised curb media and U-turn lane on McCord Rd~|~21 - Safety~|~63349A8DE8396F64544997B9B6AEB739479C3B29 118112~|~3~|~3~|~03/MPO~|~Plan Split for Transportation Alternatives funding to add side path along north side of SR-2~|~28 - Facilities for Pedestrians & Bicycles~|~4D23E52481D679DE6EBA193F81DA66001959FD3A 95105~|~1~|~1~|~01/ERD~|~100% federal funding using earmark id no. FL1201 for the stream relocation along Riverview Road to prevent erosion from undermining the pavement due to flooding in the City of Brecksville.~|~44 - Other~|~FFB3F4D50E2801D5CF9CA0786A6A5AEC9875FF0A 99681~|~1~|~1~|~01/NHS~|~Resurfacing work funded at 80% federal and 20% state.~|~05 - 4R Maintenance - Resurfacing~|~653D8A322FEA107CDBF77117800DD8E3314D2536 99681~|~1~|~2~|~02/SAF~|~New plan split for rumble striping along the project length.~|~17 - Construction Engineering~|~FB4086B38B34132FBF481F7C68B69CC72361AF93 100915~|~1~|~1~|~01/NHS~|~Microsurface NHS route in Auglaize County.~|~05 - 4R Maintenance - Resurfacing~|~0C23A5A781D565E3F8C80C8B9828311A6F254E46 100915~|~1~|~2~|~02/S<2~|~Microsurface various STP small urban routes in Auglaize County~|~05 - 4R Maintenance - Resurfacing~|~23A7746BE0D28C1167A835D274B8803993F787D0 100915~|~1~|~3~|~03/STR~|~Microsurface STP rural routes in Auglaize County~|~05 - 4R Maintenance - Resurfacing~|~EC47B4B0F01E208F4F9C0F85BAB8B5E6D0E233D2 92561~|~1~|~2~|~02/S>2~|~SFN 6704832 POR-IR 480-0078 bridge widening.~|~13 - Bridge Rehabilitation~|~3AB1BC640B5C2F232BA28A74482E8167946F27F7 92561~|~1~|~1~|~01/S>2/Stre~|~Construct left turn lanes along all signalized intersections of Frost Road, upgrade all existing traffic signals, in the City of Streetsboro, Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~FF8071D24EEC451F56AB62F6F541BDA9E1F554A6 92561~|~1~|~4~|~04/NFP~|~Bridge aesthetics on SFN# 6704832.~|~~|~C4286FB913A36517D85AD40B20571D2BFAD88F54 92561~|~1~|~3~|~03/S>2~|~100% Local split to cover waterline work.~|~43 - Utilities~|~678590AE57F4E6F7888A522B81176C5A2C0AB299 108243~|~1~|~1~|~01/IMS~|~Slope stabilization treatment at IR-480 locations using GSM funds with a 90% federal and 10% state participation split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7DAC42BBFB9F7A6ED5E539E34BFBEC7759CB04E4 108957~|~1~|~1~|~01/SAF~|~The project consists of changing pedestrian signals to countdown signal, installing ladder style crosswalk markings, and replacing damaged walk and curb ramps.~|~28 - Facilities for Pedestrians & Bicycles~|~BC0298C54CDFCAE37F07D347D79B41F84CC92B05 90639~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~08BEC079472EC0B58E7F619BF81A45B413C5B137 114771~|~1~|~1~|~01/IMS~|~R/W Fencing Replacement~|~17 - Construction Engineering~|~ED1551D8436EECACF0C9BD9E921CED470869245E 117646~|~1~|~1~|~01/STR~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E17392A342354F0135AB0803043CEF3C78402A8C 117375~|~1~|~1~|~01/BRO~|~Complete structure replacement utilizing CEAO BFP Federal (4B87) funds at 100% up to maximum of $1,695,000.~|~10 - Bridge Replacement~|~F2F20BA5247D60ACC8A92813015A0E640FB57A80 84756~|~1~|~1~|~01/ENH~|~Construct a 14' wide bikeway/pedestrian bridge over the Great Miami River to connect sections five and six in Miami County's Trail system. Construct a segment of bikeway running North on the East side of the River to connect sections five and six in Miami County's Trail system in Staunton and Washington Townships, approximately 1600' South of Peterson Road.~|~28 - Facilities for Pedestrians & Bicycles~|~B3F6F41171D5ACF51928F8BAC249E0624BD83BC8 104709~|~1~|~1~|~01/SAF~|~Pre-signal~|~21 - Safety~|~0402D3737AB415A453EDDAFFFA3E7DCB94DB2631 100533~|~1~|~1~|~01/NHS~|~Repair highway lighting circuit (two locations) and remove sign lights on two signs on US 23 bridge over Eastern Ave.ROS 23 9.92-11.15ROS 35 18.51 (35 & 104 Intersection).~|~44 - Other~|~4F27DA5B87EEEEE2209AE1841D97ED2E6DD7A887 122193~|~1~|~1~|~01/BRF~|~Bridge Exchange plan split~|~13 - Bridge Rehabilitation~|~94691DCECF0A364274BD5BC8DB3707A048F97E7C 90911~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~337607500528DFB4BA0BE585402AC83AE9BD541C 115358~|~1~|~1~|~01/MPO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DA916366F49056814B32A958CB43BE70D950C5B2 116634~|~1~|~1~|~01/NFA~|~Pruning Project. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0D8BEBC5695E6D3697654FA73DFC123C400AB41E 116791~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~A043853B7606EF8FA12E150D918CB4D183C43729 82844~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project. WAS SR 555 1.25-7.71. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~5032BB6A77501713C40B06BA5624675A74953CFD 82844~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project. WAS SR 555 0.00-1.25. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~0024FDF6A5BC756D5CA758BFEB0E0D038BAF2001 100191~|~1~|~1~|~01/STR~|~Landslide repair project. VIN 50 1.40. DSR VIN-001. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C8B1D6B4E592C636245E21D88559C2D4DF38172 116962~|~1~|~1~|~01/MPO/BARB~|~Resurfacing.~|~~|~FF3F8B2FAE61E8F5E679B25CD38788B87C488E4C 127093~|~1~|~1~|~01/NFA~|~SOPEC EV charger projects ~|~63 - Electric Vehicles & Charging Infrastructure~|~EB50085F27B807D207FAD029331C8640A8F48C77 100659~|~1~|~1~|~01/STR~|~plan split for the rural sections of the project. This includes SR 730 and both SR 730 AC, and SR 730CC.~|~05 - 4R Maintenance - Resurfacing~|~EEC07D349B0CEFCFD91B97BB3FB04C8F50496EE2 105003~|~1~|~1~|~01/NFP~|~Split for culvert replacement and drainage upgrade~|~04 - Reconstruction - No Added Capacity~|~1A9B42B6C51305FEAF0AB02874F8ACC135E894A9 123129~|~1~|~1~|~01/IMS~|~Resurfacing with asphalt concrete~|~~|~23727D09E1DDE5A824A508B9B1DF555043E80189 123129~|~1~|~2~|~02/NHS~|~Resurfacing with asphalt concrete~|~~|~1C9F7AF1BADD116D929E7361EC631F9378F17CAA 123129~|~1~|~3~|~03/S5K~|~Resurfacing with asphalt concrete~|~~|~5A13D4BF4EB3BB38DC79F1387BA03D64F94DCA49 123129~|~1~|~4~|~04/STR~|~Resurfacing with asphalt concrete~|~~|~E36BF9A0071F3AA9A036615FC782414AFEA2AFC3 123129~|~1~|~5~|~05/NFA~|~Resurfacing with asphalt concrete~|~~|~9D042DE9429652A38258EF56BD511A4ABD120550 93108~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~27BA3700DF90E2979944F2A59D99B583199EC79A 93108~|~1~|~3~|~03/S<2~|~Urban Split - SLM 3.45 - 4.74~|~05 - 4R Maintenance - Resurfacing~|~83C3F37E3E8C21576C4025C61C943D085C1E69CA 93108~|~1~|~2~|~02/STR~|~Maintenance work on 2 structures~|~13 - Bridge Rehabilitation~|~9DA5BAB268B3A232AA4C81192313BCC3258AC869 84527~|~1~|~1~|~01/S<2~|~LOR-254-00.40 - 02.83 Project includes pavement repairs, resurfacing with asphlat concrete, adjsuting castings where ncessary, placement of pavement markings and minor structure maintenance.~|~05 - 4R Maintenance - Resurfacing~|~88A3A5B3D66FE2311E16C6CF08C08BAC72869983 115683~|~1~|~2~|~02/STR~|~Recessed Wet Reflective Pavement Markings for Rural Routes~|~21 - Safety~|~983C85DF91AB67A044E6AFA336B52A3CDCCD27EF 115683~|~1~|~3~|~03/S5K~|~Recessed Wet Reflective Pavement Markings Urban~|~21 - Safety~|~BB37FC32331B26854130E901980D5EE9BE7EAE3A 115683~|~1~|~1~|~01/NHS~|~Recessed Wet Reflective Pavement Markings on NHS (OTT-2, SAN-6 from 14.61 - 18.458, SAN-20)~|~21 - Safety~|~6B5023852E3DA9E8875E20ED62C22BB19836D6D5 115683~|~1~|~4~|~04/IMS~|~Plan split for pavement markings on Interstate (LUC-475)~|~21 - Safety~|~1D79911CA46A64B3E0015F27B278BDEC75FE20BE 124429~|~1~|~1~|~01/IMS~|~Bridge preventative maintenance work on interstate bridge~|~47 - Bridge Preventive Maintenance~|~2F7115122CF1E5810F351BD56F3EC1BFBC11970E 124429~|~1~|~2~|~02/NHS~|~Plan split for bridge preventative maintenance work on NHS system~|~47 - Bridge Preventive Maintenance~|~C42D02252FBFA71D6C6C20DEB23A82477EB9C0B7 127069~|~1~|~1~|~01/NHS~|~Plan split for eligible items for Urban Paving funding associated with resurfacing an NHS route~|~05 - 4R Maintenance - Resurfacing~|~9666E7778C3B0F4CBC1DB32C7EA3956160AF8DA1 127069~|~1~|~2~|~02/NHS~|~Plan split for 100% local project costs non-eligible urban paving items.~|~05 - 4R Maintenance - Resurfacing~|~ECFBEAA645BEFE02C476E448748019FA0CA57FE1 99754~|~1~|~1~|~01/IMS~|~ LUC-75-0130 (SFN: 4802853) LUC-75-0139 (SFN: 4802888) LUC-75-0167L (SFN: 4802942) LUC-75-0167R (SFN: 4802977~|~13 - Bridge Rehabilitation~|~74EEADA370922AEFA81835B279B4F9F53A6801DE 122714~|~1~|~1~|~01/NFA~|~All cul-de-sac work included in this split.~|~21 - Safety~|~A6FB8C6DEF2ACBDCC9DA29234EC2D8DA7126CAFE 98591~|~1~|~1~|~01/SAF~|~Lengthen EB left turn lane and add a new WB right turn lane on HOC 33 2.38. Funded 90 federal/10 state.~|~17 - Construction Engineering~|~D31709A41A37865EA893C75675464B901E7E28BC 112677~|~1~|~1~|~01/NHS~|~Overlay of MAR-23 over SR529~|~47 - Bridge Preventive Maintenance~|~14375F34C8612322EA1B36F82453027E66214A76 112677~|~1~|~2~|~02/NHS~|~Work on US 23 bridge over SR95~|~47 - Bridge Preventive Maintenance~|~A880DFB1CBB0175A9A2F24801BA67A35DCF309B8 112677~|~1~|~3~|~03/S5K~|~Bridge work on SR 529 over Graves Creek~|~47 - Bridge Preventive Maintenance~|~9FA75EB4C96AC43F738182CD0D351732B907BC16 93808~|~1~|~1~|~01/NFP~|~Project uses only SAC 4MA7 funds.~|~~|~6193AFD95077448CDE16490561C9265CF62E38F1 105217~|~1~|~1~|~01/S>2~|~Rehab bridge size culvert on Lg. Urban Route .~|~04 - Reconstruction - No Added Capacity~|~4807469C1844DA81D5782B7DC008CAC8FEAFBEAD 105217~|~1~|~2~|~02/S>2/PARK~|~Plan split for HAM Parks portion of the project.~|~04 - Reconstruction - No Added Capacity~|~9AF84364A0D5FDE4BA1A3AF9F5073C9DD0E75641 105217~|~1~|~3~|~03/S>2/ODNR~|~Plan split for ODNR portion of the project.~|~04 - Reconstruction - No Added Capacity~|~EC58C2F1C655A567E65169F320CA140D85A3CFDB 118629~|~1~|~1~|~01/ENH~|~Remove sodium lights & replace with LED lights~|~44 - Other~|~48C02F56E237CD027221173FDC0F6D5345B35853 90991~|~1~|~1~|~01/STR~|~3503135 HEN SR109 18.2 Intersect: Maumee River~|~10 - Bridge Replacement~|~69B976A6EF76EDEBDCC16CB1A3F57378D407A9FB 95527~|~1~|~1~|~01/MPO~|~MORPC STP & Westerville funding for Sunbury Rd widening~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~29C6BD6A7AF9E4C04119B278CC9B266E83F8D5B0 97773~|~1~|~2~|~02/BRF~|~Bridge replacement project. ATH CR25 7.53 (SFN 0534706). Funded through the OBPP.~|~10 - Bridge Replacement~|~3151D3DFEAF874F35511C944C8DBC8DFD198E06C 97773~|~1~|~3~|~03/BRF~|~Bridge replacement project. ATH TR343T 0.65 (SFN 0543632). Funded through the OBPP.~|~10 - Bridge Replacement~|~600B35A38B3E213A1D57EFE83AC36F4BE027758D 97773~|~1~|~1~|~01/BRF~|~Bridge replacement project. ATH CR24C 1.35 (SFN 0534404). Funded through the OBPP.~|~10 - Bridge Replacement~|~9CB71C77BD2E1D7CC640AA212E8CFD2168E06F2B 97773~|~1~|~5~|~05/BRF~|~Bridge replacement project. ATH TR265T 0.25 (SFN 0547697). Funded through the OBPP.~|~10 - Bridge Replacement~|~C138D445989857C29097B7386CC293386CD4267C 97773~|~1~|~4~|~04/BRF~|~Bridge replacement project. ATH TR229T 0.85 (SFN 0545511). Funded through the OBPP.~|~10 - Bridge Replacement~|~EA275F4E5371886916A6BC8EDF0EE8B3F22C60A5 126921~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~3A77414F356BDB2145EC126990591B3B8C410655 111193~|~1~|~1~|~01/MPO~|~MPO funded plan split~|~05 - 4R Maintenance - Resurfacing~|~08860BF655728B47581C9D5AFDD42B0D9A94B46D 111193~|~1~|~3~|~03/S5K~|~Urban Paving plan split~|~05 - 4R Maintenance - Resurfacing~|~E00B3A07BDABEB6FD6B38B9CA511C08AE6C1F28F 111193~|~1~|~4~|~04/NFP~|~Plan Split for 100% locally funded scope items, such as pavement repair, sidewalk, curb and gutter on Urban Paving funded segments of road and any non-eligible items on MPO funded road segment.~|~05 - 4R Maintenance - Resurfacing~|~8E9F2C58F0B09F24434C1D0E432F85B6B415FE97 111193~|~1~|~5~|~05/SAF~|~Safety funded scope for PHB's~|~21 - Safety~|~26F0CE526E60F7F449502EEA329EF777F510EE4A 111193~|~1~|~2~|~02/MPO~|~MPO funded SUP~|~28 - Facilities for Pedestrians & Bicycles~|~C6D7C27977189B2C53877646CC6DC01A0DEB7648 101336~|~1~|~1~|~01/NHS~|~Plan split for all work associated with OTT-2-0037 bridge replacement~|~04 - Reconstruction - No Added Capacity~|~F9B8D790CB58FD7E8A58A256A6EB5BE05EE41D89 107258~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail on various county roads~|~21 - Safety~|~0D8C31A46BE74BB2E252F8B697A1B19DBEDE3FA7 124713~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation of federally eligible bridge on the interstate system.~|~13 - Bridge Rehabilitation~|~2A8C3FBE0899906F2B2DFAC913549FAD8757310E 121638~|~1~|~1~|~01/S5K~|~Traffic signal system upgrades and optimization utilizing Federal Carbon Reduction Funds (4CU7) at 80% up to Federal CAP. ~|~21 - Safety~|~C40C8882913C774C47AF92E30FD0028BD92999CF 115616~|~1~|~1~|~01/SAF~|~Install centerline raised pavement markers for the entire length of Zimmerman Road and Storms Creek Road~|~21 - Safety~|~2E67F778C7ED8CC6FD9C1CF1DEE282DF63399CC1 90962~|~1~|~1~|~01/BRF~|~Project involves replacement of the structurally deficient Bridge No. PRE-TR 218-0020 (SFN: 6836402), which carries Concord-Fairhaven Road (TR-218) over Four Mile Creek. Work includes minor approach work, pavement repairs, and vertical alignment adjustments.~|~10 - Bridge Replacement~|~29E9A04E69B601F99F6742F12985ACB2A36622F4 105059~|~1~|~2~|~02/NHS~|~Microsurfacing.~|~~|~14F15AA9AB38393DAF9C50A3C48082E4E61A0E43 105059~|~1~|~4~|~04/STR~|~Microsurfacing.~|~~|~6C61B365C428C9FB4F470936E647A9CB2B8AC936 105059~|~1~|~1~|~01/IMS~|~Double microsurfacing.~|~~|~9504AEF3E97202F4FF2135FAD71DD35DB2825BAF 105059~|~1~|~3~|~03/S5K~|~Microsurfacing.~|~~|~4C1D7B9F3433314678615D0AFBB9512BB0ABF568 76796~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~5A281626CED65CE6E6A42D58A670BEC25B758270 120377~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~57D02A286CE8271A509354B03187052645BC3CAF 88999~|~1~|~1~|~01/BRO~|~Bridge replacement~|~10 - Bridge Replacement~|~288552B2E1DF101B4ED147662880AC2061C223F6 90521~|~1~|~1~|~01/CMQ/STA~|~Plan Split for construction of roundabout, for STA CR 252 from 3.10 to 3.30~|~21 - Safety~|~D138FABFB0E7F6E7F49DD217A534463326814C55 103283~|~1~|~1~|~01/MPO~|~Construct New Sidewalks on south side of Dobbins Road in Poland Township between Administrative building drive to Tuscany Drive, approximately 2,100 ft.~|~21 - Safety~|~5617128ED8181F80A422891AFD12E44C9370F422 87515~|~1~|~1~|~01/NHS~|~Pile encasement on bridges HOC US 33 13.13 LT and RT. SFN 3700690(L) and 3700720(R). NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F628D47A2055F3A5D738B2E03D8623179031706 87515~|~1~|~2~|~02/BRO~|~Bridge replacement project on HOC US 33 15.13 RT, SFN 3700879. BR eligible.~|~10 - Bridge Replacement~|~B614AF0797AF360435B923BA6AD591E7BED309A7 101899~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~CF5BED015B1BA424F1FE456A9C6555556C21D56D 116417~|~1~|~1~|~01/BRF~|~Replacement of SFN 2576244~|~10 - Bridge Replacement~|~FDBB6735640A80DF17A5C34A35484A78A4B811D1 122099~|~1~|~1~|~01/IMS~|~Plan Split for Safety upgrades at the intersection of IR-71 and Pearl RD~|~21 - Safety~|~9CDC2A57880A75CF7EDF01A5B34BDED193976091 98097~|~1~|~1~|~01/NFA~|~Non-Fed Aid 100% State SLM 5.52 to 10.51~|~05 - 4R Maintenance - Resurfacing~|~186EF8055C82E027AE53397CB781193D2569375F 98097~|~1~|~2~|~02/S<2/WCH~|~STP Urban Paving WCH 80/20 SLM 11.66 to 12.58~|~05 - 4R Maintenance - Resurfacing~|~00B0DF8F9F1F90227CF6B956FF9993BF88A6AEB9 98097~|~1~|~3~|~03/STR~|~STP Rural 80/20 SLM 10.51 to 10.62~|~05 - 4R Maintenance - Resurfacing~|~60F10D346AC359A528BCAD394CDB823D4738F2D4 98097~|~1~|~4~|~04/S<2~|~STP < 200,000 paving SLM 10.62 to 11.66 and 12.58 to,12.78~|~05 - 4R Maintenance - Resurfacing~|~33B6EAE71E07030FE189A6E51D812F7A15B8E7B4 98097~|~1~|~5~|~05/NFA~|~Bridge deck patching and sealing. Non Federal-Aid. 100% State~|~13 - Bridge Rehabilitation~|~485E29061DB17AFD0666D0D433923134E8AF8C25 98097~|~1~|~6~|~06/S<2~|~Bridge deck patching and sealing on two structures~|~13 - Bridge Rehabilitation~|~63F20199DB2CFC6DDEA89222C7D81C4C143631DE 110257~|~1~|~1~|~01/MPO~|~Widen Wayne Avenue from Wyoming Street to Waldo Avenue from four lanes to five lanes. The project includes new sidewalks, curbs, street pavement and street lighting.~|~03 - Reconstruction - Added Capacity~|~C5F9AEAA9BB86481DD7B60FE248367948285CE51 104642~|~1~|~2~|~02/NFA~|~Resurfacing Niles-Vienna Rd from 4.96 to 5.51.~|~05 - 4R Maintenance - Resurfacing~|~DA5BFB18327CD24666274D7AE96678E4E70AD8FF 104642~|~1~|~1~|~01/MPO~|~Resurfacing of Niles-Vienna Road from 1.44 to 4.96.~|~05 - 4R Maintenance - Resurfacing~|~26A7B1533D2E50EE182C6EEEC216EB48EBB81308 83708~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using a chip seal treatment. MOE 260 0.00-4.33 and WAS 260 0.48-9.76 and 9.98-11.00. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~8F071BBA6BE361E8E39DCB2AF66681626CF17787 122310~|~1~|~2~|~02/S>2~|~Plan split for resurfacing of STP>200,000~|~05 - 4R Maintenance - Resurfacing~|~D6480C7DAD87EE5CEBA9EBF09A8ED5A4BED05BE6 122310~|~1~|~3~|~03/ENH~|~Plan Split for work items eligible for Transportation Alternative Funding~|~05 - 4R Maintenance - Resurfacing~|~7407D92234BED230602D48958D50FEDC268FBE46 122310~|~1~|~1~|~01/NHS~|~Plan split for resurfacing NHS route.~|~05 - 4R Maintenance - Resurfacing~|~CBCD033BB7C6E0D49DD6E6A0968F4A87A4805918 85314~|~1~|~1~|~01/STR~|~SR45 11.07; installation of new and replacement sidewalks from water street to high street. SAC description (4SC7) for safe routes to school.~|~~|~D4D9B930570C2AA2AE499D3B8B18BE5CC96FC5B5 95805~|~1~|~1~|~01/NFA~|~Not on the federal aid system, COL-558-0.67 and various other sites for culvert repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~AE9C60810E61BA2DCE398EE65EC05C97A52A2F2B 124560~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded roundabout work~|~21 - Safety~|~280F321779C5CD2DC20D1B12EF075045B3F393A9 110602~|~1~|~1~|~01/NFP~|~Split for lighting upgrade on the interstate system~|~21 - Safety~|~868B0B139B6B315E87FEC8379F4B9F6F034F5567 126157~|~1~|~1~|~01/NHS~|~Plan split for conduits on the NHS~|~04 - Reconstruction - No Added Capacity~|~525AF0BDBB617A896103B638F00E19450067DA95 101252~|~1~|~1~|~01/S<2~|~ederal/Local Urbanized Area Inside Corp. Limit (Paving Items):HUR-SR-269 ? SLM 05.49 to 05.730(Rt) SLM 05.83 to 05.870(Lt) SLM 06.03 to 06.120(Rt)HUR-SR-269 ? SLM 05.730 to 05.83 SLM 05.870 to 06.03 SLM 06.120 to 08.09ERI-SR-269 ? SLM 00.220 to 00.39(Rt)HUR-SR-113 ? SLM 01.040 to 01.08(Rt)HUR-SR-113 ? SLM 01.740 to 01.84(Rt)ERI-SR-269 ? SLM 00.000 to 00.22HUR-SR-113 ? SLM 00.970 to 01.04HUR-SR-269D?SLM 00.000 to 00.76~|~05 - 4R Maintenance - Resurfacing~|~328530CFAD371E091910E93F79B782A5A54A4163 101252~|~1~|~2~|~02/S<2/BELV~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):HUR-SR-269 ? SLM 05.49 to 05.730(Rt) SLM 05.83 to 05.870(Lt) SLM 06.03 to 06.120(Rt)HUR-SR-269 ? SLM 05.730 to 05.83 SLM 05.870 to 06.03 SLM 06.120 to 08.09ERI-SR-269 ? SLM 00.220 to 00.39(Rt)HUR-SR-113 ? SLM 01.040 to 01.08(Rt)HUR-SR-113 ? SLM 01.740 to 01.84(Rt)ERI-SR-269 ? SLM 00.000 to 00.22HUR-SR-113 ? SLM 00.970 to 01.04HUR-SR-269D?SLM 00.000 to 00.76~|~05 - 4R Maintenance - Resurfacing~|~FF7BB120314B51BEE95E8DF3AA6C989FD6A1E676 101252~|~1~|~4~|~04/S<2~|~Federal/State: Bridge WorkHUR-SR-269 06.590~|~13 - Bridge Rehabilitation~|~976A5AACE5D64688802C29F1499727947845435B 101252~|~1~|~3~|~03/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?):HUR-SR-269 ? SLM 05.490 to 05.73(Lt) SLM 05.830 to 05.87(Rt) SLM 06.030 to 06.12(Lt)ERI-SR-269 ? SLM 00.220 to 00.39(Lt)HUR-SR-113 ? SLM 01.040 to 01.08(Lt)HUR-SR-113 ? SLM 01.080 to 01.74HUR-SR-113 ? SLM 01740 to 01.84~|~05 - 4R Maintenance - Resurfacing~|~086FB66E83E700B2B204B4913D8485E114CB9379 91910~|~1~|~1~|~01/BRO~|~Rehabilitate Bridge HAM-71-1717 (Cornell Rd. Over I-71) by replacing the deck, eliminating the hinge, and perfroming other related rehabilitation work. SFN: 3107418 and intersect: C256(Cornell Road)~|~13 - Bridge Rehabilitation~|~CC015C99A29E2E3FF2E475AB91172E465FCD21A0 126170~|~1~|~1~|~01/ENH/GREE~|~Construct 8' sidewalk on the north side of Steese Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~97231E2E9F37E90EB3E71766EE82E0AB043FC22C 102591~|~1~|~1~|~01/NFP~|~Access control/intrusion and CCTV, fencing and one Autogate.~|~44 - Other~|~0BC38E7AC104AD674CF4C6F3D4ABEFAB83CF0033 123448~|~1~|~1~|~01/NHS~|~Corridor pedestrian safety and traffic calming improvements~|~~|~8E9A2BDD43261C6C016FC315C12CA00BAC19FCDE 97692~|~1~|~1~|~01/NFP~|~"01/NFP/OT" established for construction of new county garage, new 1500 ton salt dome, and new wash bay at existing county garage location.~|~01 - New Construction~|~C0A8968FD192F4833859C9DF9277CA37D826217C 89484~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various routes in Darke County on DAR CR 51 8.33 to 11.82 segment length 3.49 total lane miles 6.98.~|~21 - Safety~|~0E54092A3E1A0B24EDFD15254BEF8B61C04FCD6F 89484~|~1~|~2~|~02/NFA~|~Upgrade existing pavement markings on various routes in Darke County on DAR CR 51 0.00 to 8.33~|~21 - Safety~|~C30D3D9F34C2228AB2BDC6AB87D3FB1A5A5174BD 96289~|~1~|~1~|~01/STR~|~Off SR93 on CR169 (Ellisonville-Smoky Row Rd) it is proposed to replace the structure (SFN 4401425).~|~10 - Bridge Replacement~|~87369592057273F150CBE8C81D303C2275F33DF0 87257~|~1~|~1~|~01/STR~|~D6 funded bridge replacementSFN 8002797 ; UNI SR-245 ; Bridge over Big Darby Creek01/STR/BR/~|~10 - Bridge Replacement~|~C40E92845ACCD12C4703A25173041693B06AC5DA 117805~|~1~|~1~|~01/NFP/NALB~|~Plan Split 01/NFA/OT/NALB~|~04 - Reconstruction - No Added Capacity~|~A297944D1F3192AA717AF1FC017B1A080F584A9B 99624~|~1~|~1~|~01/NFP~|~Provide fiber optic splices at various locations~|~44 - Other~|~570793CAF7E1E8518897304218C48238A554D62E 111347~|~1~|~1~|~01/NFP~|~ODNR project to microsurface parts of R-4 and F-5 parking lot in Burr Oak State Park. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~631DE9B81B4A6E35F520440FC013129440D2779C 93235~|~1~|~1~|~01/MPO~|~Construct three bikepath ramps from the city streets to the Great Miami River Trail. Southeast corner of the West Fifth Street Bridge over the Great Miami River, the Southwest corner of the West Fifth Street Bridge over the Great Miami River,and the East side of West Riverview Avenue Great Miami Boulevard.~|~28 - Facilities for Pedestrians & Bicycles~|~0F473C5B4BC36392D88281555BB0422329A3856A 113011~|~1~|~1~|~01/NFA~|~D09 crack seal project~|~99 - State Preventative Maintenance~|~94B109EEBE2777C0C7F40EAC8BCE31396A121514 100974~|~1~|~1~|~01/S<2~|~Smooth seal SR 123 in Montgomery County: MOT SR 123 SLM 0.00 to 2.08~|~05 - 4R Maintenance - Resurfacing~|~B41430CA45B42D3BDD29461EE20ED117F21751F2 95416~|~1~|~1~|~01/SAF/HIG~|~It is proposed, using CEAO Safety funds, to install new and upgrade existing guardrail on various county roads within Highland County. 100% Fed Safety funds~|~17 - Construction Engineering~|~DD8382513EBAC5701C915729D62F8C044C9B030F 101346~|~1~|~2~|~02/STR~|~bridge rehab.~|~13 - Bridge Rehabilitation~|~03A430AA2D3F228FEE03ECD966FCE35631BF5960 101346~|~1~|~1~|~01/STR~|~Resurfacing SLM 9.48-11.05.~|~05 - 4R Maintenance - Resurfacing~|~146A2650CAB2FF0A39F07A6937C3011BCF0561FC 85549~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Deck replacement on 3001741 GUE IR70 17.30 Intersect: I-70 Under Cr 73; BR Eligible for Rehabilitation: Length=283 SD/FO(1) SR=55.9 DSR=4~|~13 - Bridge Rehabilitation~|~06C46BD246E38C42357E98578C670094F39F3796 115066~|~1~|~1~|~01/NHS~|~Bridge embankment repair.~|~47 - Bridge Preventive Maintenance~|~9267B0820B62F1B1D4D4BEECAF1B0BE4852C6F90 113904~|~1~|~1~|~01/STR~|~FDR-ASD SR 603 00.00 to 03.62~|~04 - Reconstruction - No Added Capacity~|~3239BBC13DA20EB0819081723CDAB903B4CA652C 101332~|~1~|~1~|~01/S>2~|~Plan split for all work associated with the LUC-246-0143 bridge~|~04 - Reconstruction - No Added Capacity~|~36E6EA6D9A6115A362CDFC1D9236E86061102859 84202~|~1~|~1~|~01/SAF~|~Two-year guardrail repair (ding and dent) contract for FY 2014 and 2015. 100% State.~|~44 - Other~|~11BD80546408A18362AAAFCD8BE271F38D42BD65 88309~|~1~|~1~|~01/NFP~|~This split is for state funds.~|~13 - Bridge Rehabilitation~|~2F4B7680A663318CBBB47D87DC683FBBF07B2671 108588~|~1~|~1~|~01/NFA~|~The COUNTY will construct concrete stabilization and overlay improvements to approximately 1 mile of Hoaghlin Center Road beginning at Lincoln Hwy and heading in a southerly direction~|~01 - New Construction~|~1805C33B6F135A236EB5976255196786EBB4D281 98241~|~1~|~1~|~01/NFP~|~Electrical maintenance contract for FY 20~|~44 - Other~|~18E00F0D403182CDCDFEC2C4133A92B92E1B28DB 98241~|~1~|~2~|~02/NHS~|~Upgrade signing at the intersection of DEL US 36/SR 37 at Wilson Rd using safety funding~|~21 - Safety~|~8D9A2C4E79D623D46F5CE89877BDFEA4FFCAA832 98684~|~1~|~1~|~01/NFA~|~CHP CR 193 12.62 (SFN 1130099) Old Troy Pike bridge rehabilitation The bridge project includes replacing the three span superstructure and upgrading the guardrail on Old Troy Pike, 193-1263, over Mad River. New pre-stressed concrete beams will be installed , waterproofed and paved on existing substructure. The project will also fix minor spalling on the pier caps and repair deteriorated abutment wings. All work will be done without distrubing Mad River and within the existing right of way.~|~10 - Bridge Replacement~|~00B431AE720A47BC3315256936D3C0F293FB516A 103184~|~1~|~1~|~01/IMS~|~Relocation of Columbus power line~|~43 - Utilities~|~4F8F4E4AC0ED81CDE5A477F604FD859A6D00D845 103184~|~1~|~2~|~02/IMS/Cols~|~100% City of Columbus Department of Public Service items~|~~|~B2DB12434CF3E369869E7EA8747B2F184E36BB45 117509~|~1~|~1~|~01/IMS~|~Reconstruction of a section of IR 80 due to settlement issues.~|~~|~550600DB506B10A518E236A86757D283FE874689 100117~|~1~|~1~|~01/STR~|~This plans split is for the entire project funding.~|~04 - Reconstruction - No Added Capacity~|~E421EB12DEC90554127B22C9CF0E1793E298CC69 109795~|~1~|~1~|~01/STR~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~B083E93B22E5438848AC76C6F61D82D4A1216403 109795~|~1~|~2~|~02/NFA~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~1CD99CFE490232D9A70AE76691D97338A637BF52 109795~|~1~|~3~|~03/S<2~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~E6535440D10680CF821044D3371AAA5D1A89F76B 122061~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~08715717DD932279D4C594BB4F2FD039F37A34D0 92106~|~1~|~1~|~01/BRF~|~Tolle Road Bridge Replacement. 6631169 PIK CR47 3.04 Intersect: StreamCEAO Funds. 80 Fed/20 local match by Highland County. 01/BRF/BR/Highland~|~10 - Bridge Replacement~|~50030946F35AA36177AA9AAFB0150300E909FCB6 86920~|~1~|~1~|~01/IMS~|~Bond and State Multilane funding for full depth pvmt replacement01/IMS/PV/~|~04 - Reconstruction - No Added Capacity~|~4E5B8FB96654F4D86E20107A95C76006B223A9CB 86920~|~1~|~3~|~03/IMS~|~Guardrail damage caused by motorists and not reimbursed by insurance companies~|~04 - Reconstruction - No Added Capacity~|~9737692EE6A6405709AFF1560DA16550BF109D1F 86920~|~1~|~2~|~02/IMS~|~Bridge painting of 4 overhead structures (not BR eligible):SFN 5901170, MRW-71-6.60, CR26/Olive Green Marengo Fulton RdSFN 5901359, MRW-71-8.25, CR170/Bennington Harmoney Central RdSFN 5901383, MRW-71-9.11, CR25/Waldo Fulton Chesterville RdSFN 5901413, MRW-71-9.94, CR20/Williamsport Bloominggrove RdDeck sealing of 6 mainline bridges (not BR eligible):SFN 5901200, MRW-71-7.05L, Big Walnut CkSFN 5901235, MRW-71-7.05R, Big Walnut CkSFN 5901294, MRW-71-7.56L, TR-232/Kaufman RdSFN 5901324, MRW-71-7.56R, TR-232/Kaufman RdSFN 5901472, MRW-71-12.17L, Kokosing RiverSFN 5901502, MRW-71-12.17R, Kokosing RiverSFN 5901111;MRW-71-5.96 pver abandoned CSX RRSFN 5901146, MRW-71-5.96 Over abandoned CSX RR03/IMS/BR/~|~13 - Bridge Rehabilitation~|~BF4C6025CE616B06EEF758F459FD5E66EE34B6DD 103025~|~1~|~1~|~01/IMS~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~4675097C7376344C930609B71EE2EF0F37E0C478 103025~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~BBDBC22F32D6C727A8A954FE70D6553831D7ECE3 103025~|~1~|~3~|~03/S>2~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~F981B9D46E5331F1A9EA95C2D66197ED6AB5EEC1 103025~|~1~|~4~|~04/STR~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~CEEFAE12D0839B8E671CAC43B71E2404112B2632 122434~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~D83C1FCA935B97F7686341D08DAEA5C3086F3A5A 121247~|~1~|~1~|~01/NHS~|~conduits linked ~|~04 - Reconstruction - No Added Capacity~|~5B8528D932077D50C53ADA2866038BC2B9607621 121247~|~2~|~2~|~02/S>2~|~bridge linked to CO CC lrg urban~|~04 - Reconstruction - No Added Capacity~|~49DDF7FDC53DE250612F2A2A84FAD32A66FDBC85 121247~|~1~|~3~|~03/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~92C8C630FD8457C074D55FB923F9EF599DA851EB 101210~|~1~|~1~|~01/NFP~|~Task Order PID for construction inspection services - 4PF7 (60% Federal) / 4PS7 (40% State).~|~17 - Construction Engineering~|~DDFF6D9B5DDBCD825FC10577FC44FF81ED4722A6 116541~|~1~|~1~|~01/BRF/NFRA~|~Bridge replacement.~|~10 - Bridge Replacement~|~9B0F9CE5D8B4AF017BA2F7F6B5E8E5F9EA055526 100447~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~68AE508F01C1C4452DB182E5941E1D870F4EC4BD 125217~|~1~|~1~|~01/SAF~|~Auxiliary pavement marking project throughout the District~|~21 - Safety~|~3593F756345E0776B841872691CECFB6EE9CAA3A 117405~|~1~|~1~|~01/MPO/NILE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~078780C317DCDCD76457AF57C0E7C1989D8B510F 117464~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 471 0.01, SFN 0547867.~|~~|~4BBFE85D6EB26999402C15B422A87EC2108F33AD 77262~|~1~|~1~|~01/IMS~|~Re-design the IR-76 and SR-21 interchange in the City of Norton, Summit County, Ohio. ~|~~|~948AFD807307924D693F361B2D43D0E8457EC143 97184~|~1~|~1~|~01/NFP~|~ODOT's portion of the rehab project.~|~47 - Bridge Preventive Maintenance~|~045F0C0B15D81AD4301DAF82E2619C9168A36CA8 97184~|~1~|~2~|~02/NFP~|~KYTC's portion of the project.~|~47 - Bridge Preventive Maintenance~|~A8D645146AB8275145FB25E3381DC9067CAD52B4 100995~|~1~|~1~|~01/NHS~|~Anthony Wayne Trail at Monclova Road.~|~21 - Safety~|~58D91A98626AC82DE044211F3252AA845F534A2A 100995~|~1~|~2~|~02/NHS~|~Plans split for 100% funding lighting items - City of Maumee funded.~|~21 - Safety~|~A38711A4E635E6CD77202074595CECD2C75A3202 105449~|~1~|~1~|~01/NFP~|~Mohican State Park~|~05 - 4R Maintenance - Resurfacing~|~297963FFE1276E78CEE4F3C49593B393928AD2B5 95796~|~1~|~1~|~01/STR~|~from SLM 0.00 to SLM 5.88~|~05 - 4R Maintenance - Resurfacing~|~4F07FEF929C51D3D17A7171604481C2A91E02B8B 95796~|~1~|~2~|~02/MPO~|~Widening of SR-65 in Grand Rapids~|~05 - 4R Maintenance - Resurfacing~|~E69BE1991B912788D9FB1F7ADD795CE453D90EA4 95796~|~2~|~3~|~03/MPO~|~Resurfacing of County Road.~|~05 - 4R Maintenance - Resurfacing~|~DC20F4C6F180777D8A2DF48952D8B69600E00D97 95796~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~09C2FCFCA19D4047816021FE2793408D76FA138C 92067~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - State Parks Funding 4BF7 (100% State) - No CAP - Resurfacing of the following 1-3/4" asphalt -Entrance Road R-56; Fish Mgt entrance; Fish Mgt parking lot; Wildlife Mgt Entrance; Wildlife Mgt parking; Replacement of culvert at the junction of the Wildlife parking lot and Entrance Road R-56;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C5C62CE460A37BA1A47F999327AC8161DE651A7 92512~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~604DFEED9077DBE1950A5C8747FC9459DCE7A4D5 126797~|~1~|~1~|~01/NFP~|~Electrical maintenance contract~|~99 - State Preventative Maintenance~|~16BAED040F267C48D3B958F77AB4DC25AC63F052 127079~|~1~|~1~|~01/NFP~|~Plan Split for crack sealing various routes throughout the district~|~17 - Construction Engineering~|~B3DAF35D483F33D12A7973C53656D48CBAD1EBE4 114964~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~CEB6BD33070A0A4BD15E96B90297E0A6DA824AF8 114964~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~46F7873C45590A41ED2650D186E5D9F644680216 97990~|~1~|~1~|~01/NHS~|~District Preservation Bridge Rehabilitation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of bridges on LIC-SR 16; (See Linked Bridges)~|~13 - Bridge Rehabilitation~|~3F5F26DC0D60AAF611107C4B074F4E248CACFEBB 97990~|~1~|~2~|~02/NHS~|~District Preservation Bridge Replacement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of bridges on LIC-SR 16; (See Linked Bridges)~|~10 - Bridge Replacement~|~4ADE2F8D0F954798862A6328333CF0E742C7E524 97990~|~1~|~3~|~03/NHS~|~Costs associated with widening the LIC-16-15.93R and LIC-16-15.60L structures (SFNs 4500725 and 4500695, respectively).~|~13 - Bridge Rehabilitation~|~A3FE2427AB4885978395219D3CE0036EF4189F40 97990~|~1~|~4~|~04/NFA~|~Bridge Strike~|~13 - Bridge Rehabilitation~|~DEAB62F49D2F37B24111E5C5AA3E861651CE1EF6 115334~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~54EF5A5128AFC7CE2545124ED93E56540AE29B82 91057~|~1~|~1~|~01/STR~|~Resurfacing of MAD-42 in rural area, D6 federal/state $SLM 0.00-4.80~|~05 - 4R Maintenance - Resurfacing~|~4E0F0D8CB97CF8F4245A01622104DF14781BDC78 91057~|~1~|~4~|~04/STR~|~STP Rural deck overlay 100% StateMAD-42-6.32 Oak Run~|~13 - Bridge Rehabilitation~|~888558FA2B9807882C93D2C4AE4252367A37F1FB 91057~|~1~|~3~|~03/S<2~|~MAD-42 resurfacing in urban area with D6 federal & local $SLM Left 4.87-5.81SLM 5.92-7.11~|~05 - 4R Maintenance - Resurfacing~|~AD159D9933560DC9F86F31C4D5789E4B6BAF00F0 91057~|~1~|~2~|~02/S<2~|~MAD-42 resurfacing, urban area with D6 federal/state $SLM 4.80-4.87SLM Right 4.87-5.81SLM 5.81-5.92~|~05 - 4R Maintenance - Resurfacing~|~CA6EFD88FBBB5EBE16E9F8777807F6C9377C9487 109436~|~1~|~1~|~01/SAF~|~Rebuild traffic signal to allow for backplate installation and realign ramp at State Route 741 in Moraine.~|~21 - Safety~|~30AE9A38FC6CBFEF5D94C0F71A7B05BD92051E36 120042~|~1~|~1~|~01/ENH~|~Sidewalk project utilizing Carbon Reduction, Safety, and Safe Routes to School Funding up to associated caps. ~|~28 - Facilities for Pedestrians & Bicycles~|~C960DCA744FAC1BF8FFF97D23F36E4DE21558026 126735~|~1~|~1~|~01/S>2/LCEO~|~Roadway rehabilitation of Clover Valley Road between US Route 62 and Green Chapel Road.~|~05 - 4R Maintenance - Resurfacing~|~FC6916CC095E9C01C74158F0DC37D207E742A9F4 88498~|~1~|~2~|~02/STR~|~SFN 6201547 repair abutments of existing bridge over Toussaint Creek~|~13 - Bridge Rehabilitation~|~48F67B93A302ABA272CBD3BB7ADD399B51D4046A 88498~|~1~|~1~|~01/STR~|~OTT-SR163 from SLM 4.05 to SLM 9.98~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB9C487F55D7C19048EA15FE98B9AF64EF5C4E76 101160~|~1~|~1~|~01/IMS~|~Crack sealing on IR~|~05 - 4R Maintenance - Resurfacing~|~93F16CCCFF56B7020DB9DBAD445948EDD0CBCBFF 96438~|~1~|~1~|~01/NHS~|~Replacement of steel beam superstructure with new steel beam superstructure for Bridge JEF-7-2242 (SFN 4101170). The substructure units (piers) will be repaired and abutments will be modified as needed. All existing bearings will be replaced with elastomeric bearings. All concrete surfaces will be sealed.~|~13 - Bridge Rehabilitation~|~83AC75C2D1FF0C2EFC86C48C68A74105DEF121A8 21901~|~1~|~1~|~01/NHS~|~Replace supertsructure with new steel beam superstructure on bridge COL-30-2807, SFN1502042. Raise bridge to meet current standards and repair pier columns.~|~13 - Bridge Rehabilitation~|~62FB4415814749DA21012078A195C99AD216EB5B 93618~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~0BDB554D58F0B223D35A830497CAB8C88A3665E1 115146~|~1~|~1~|~01/SAF~|~Split for RR crossing signal work~|~22 - Rail/Highway crossing~|~7CB959C7D0542872B5BCF4C0010B83207C64FCDE 120044~|~1~|~1~|~01/ENH~|~Reconstruction of sidewalks and corresponding ADA facilities utilizing Federal TAP (80%) and Safety (20%) funds up to Federal maximum. ~|~28 - Facilities for Pedestrians & Bicycles~|~634547E52F412CB1C45085616F705554AAB1EB8E 90249~|~1~|~1~|~01/NFA~|~Adams County Guardrail Project - CEAO - 100% Fed. 01/NFA/OT/ADA~|~21 - Safety~|~FFF253D4C8036B32EA80F784E1DE801CF5E9DBD7 108441~|~1~|~2~|~02/NFP~|~100% city funded items no eligible for CMAQ funding~|~04 - Reconstruction - No Added Capacity~|~FDF150A5E1F61F3205D5B355EA459DA140E3EF17 108441~|~1~|~1~|~01/MPO~|~MPO CMAQ plan split~|~01 - New Construction~|~1D0E086F0B6DCB98A6D7869CF5A39D87CC80C84A 123954~|~1~|~1~|~01/STR~|~geotech plan split.~|~04 - Reconstruction - No Added Capacity~|~58847F5F50FBD311FD495C1F2328DC6EF4C45F2A 91127~|~1~|~1~|~01/SAE~|~This plan split is for the traffic signal work items for this project using the safety sac 4HJ7.~|~21 - Safety~|~6C49C0FB31A5C65835AC5CED3D905D93E040D890 91127~|~1~|~2~|~02/ENH~|~This plan split funding event is using transporation enhancement and district preservation funds (4B37 & 4PS7) to construct the sidewalks, ADA ramps and retaining walls that are included in this project.~|~28 - Facilities for Pedestrians & Bicycles~|~E9DB26752D3112BD5F65F10B3BA287E2950A4F88 84859~|~1~|~1~|~01/BRF/COL~|~"01/BRF/BR/COL" - Knox Township, Sections 5 and 8, 0.5 mile east of CR 401. Replace 31' steel beam bridge over unnamed stream. Includes minor profile adjustments, guardrail, striping and signing. 80% federal 4B87/20% TRC.~|~10 - Bridge Replacement~|~47032F153CA5B8246340A3FF5229A9B6DD8ABF8A 84859~|~1~|~2~|~02/BRF/COL~|~"02/BRF/BR/COL" - Knox Township, Sections 5 and 8, 0.5 mile east of CR 401. Replace 31' steel beam bridge over unnamed stream. Includes minor profile adjustments, guardrail, striping and signing. CE On Going Services only, 80% federal 4BP7/20% TRC.~|~10 - Bridge Replacement~|~CA54E9D21A5E7B668E8A07DAEF2139FE1FB32C2D 124876~|~1~|~1~|~01/SAF~|~Plan split for safety funding for pedestrian crossing enhancements at various intersections, PSIP~|~21 - Safety~|~73890BFCEF833D49971D9ED6C6B692F809E0B70C 102375~|~1~|~2~|~02/IMS~|~All work for construction of new bridge south of existing bridge.~|~08 - Bridge - New Construction~|~C0C5F184266CE0B626CE0212739971E10DB2A46A 102375~|~1~|~1~|~01/S5K~|~Roadway reconstruction work on CR 99 involving addition of through lanes. (Added capacity.)~|~03 - Reconstruction - Added Capacity~|~8B5E63399184BD47E022669093E7FAC7AE176710 102375~|~1~|~3~|~03/IMS~|~All rehabilitation work including deck replacement on existing bridge. ~|~13 - Bridge Rehabilitation~|~D8B37BBF833164EFE8F861681BE295DC554D7E21 102375~|~1~|~4~|~04/S5K~|~All roadway reconstruction work that does not involve the expansion/widening of the roadway to create additional capacity (through lanes).~|~04 - Reconstruction - No Added Capacity~|~67A9D3D8B494C13BC1FEFE313D438CF2B9846A4B 124142~|~1~|~1~|~01/NFP~|~Reclamite on one lane of CRA-96-0.00 to 3.66~|~05 - 4R Maintenance - Resurfacing~|~84B711146985204B869AA2CE60DBD4525EAA7AE2 110519~|~1~|~1~|~01/MPO~|~Purchase of bikes and bike kiosks to expand the Red Bike system in Cincinnati.~|~28 - Facilities for Pedestrians & Bicycles~|~860CA17D83F535283E08B642E3AD04161D6CA691 113702~|~1~|~1~|~01/MPO~|~Split for TLCI intersection crossing work.~|~28 - Facilities for Pedestrians & Bicycles~|~8A5E218A542A8B3653059E6C9F45714B9B50B9A1 101451~|~1~|~1~|~01/STR/BPOR~|~DSR# BEL-024~|~~|~09E09FAA2FD26C76E4E6B4DC8A0DADE7C0135042 117326~|~1~|~1~|~01/STR/FCEO~|~Superstructure replacement of BLO-20-1.964 (SFN 2343363) carrying Pickerington Road over Walnut Creek.~|~13 - Bridge Rehabilitation~|~FE3DF86D9E97A429CF02E4FB605E0B84AC31DA55 110168~|~1~|~1~|~01/S>2~|~Resurfacing of SR 59 from 0.00 to 1.51 and SR 43D from 0.53 to 0.62 in the City of Kent, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~9C6C1F5E8E1FBF4D0659F4CCE4DC364F1836DE15 110168~|~1~|~2~|~02/S>2~|~Partial and full depth pavement repairs, curb and gutter and ADA curb ramps in the city of Kent.~|~05 - 4R Maintenance - Resurfacing~|~7BD407F273F6EB409DD8AF2883C39DC5579B4647 99634~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~470A249DBE81B96850F1DD883348B3A1619FCB52 115136~|~1~|~1~|~01/STR~|~Slide repair.~|~04 - Reconstruction - No Added Capacity~|~669262B3B77BCA10D463EDA9505A9228D7053F28 112730~|~1~|~1~|~01/NHS~|~UNI-33-7.85 L/R - Replace box beams~|~~|~376DAC4C7C39982CE6C6BCF8B19DB86466CA3DCA 97998~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for Gue-77-0804L~|~13 - Bridge Rehabilitation~|~2BAA899DBD9DCAAE33220C454673A3346274C2D5 97998~|~2~|~2~|~02/IMS~|~"02/IMS/BR/ " - plan split 02 for Gue-77-0804R~|~13 - Bridge Rehabilitation~|~7D731EA7177C8E24503EEB2EA9BA97F421112843 97805~|~1~|~1~|~01/IMS~|~Mowing various routes and locations in BEL, JEF and TUS counties.~|~31 - Landscaping & Other Scenic Beautification~|~5FFFE0FF0D545BB2FA3A1AD31179CA3567BE06D3 107012~|~1~|~1~|~01/IMS~|~Mowing Contract~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7FA4705701AE0202BB56DA498BD38BDAC973F4F9 107012~|~1~|~2~|~02/IMS~|~Mowing contract in D7 on:MOT IR 675 SLM 0.00 to 7.44MOT IR 75 SLM 0.00 to 9.31~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0E955E4F9F36B33061CA63A2A860254F8FFF9DC8 101150~|~1~|~1~|~01/NHS~|~Various bridges (3500063)~|~13 - Bridge Rehabilitation~|~3F01245C58DF81C8C888DA7799707F39E1B8E6C0 101150~|~1~|~2~|~02/STR~|~Various bridges (7403909)~|~13 - Bridge Rehabilitation~|~0376FB414C2FC96AAD6F83AF61D4800BA1E8CE00 121896~|~1~|~1~|~01/SAF~|~Widen roadway and shoulder, remove fixed objects. ~|~21 - Safety~|~8E6A65E6ED26ABFA4CF857FF942B27801F7AD82B 121896~|~1~|~2~|~02/SAF~|~Provide EB left turn lane at Van Gorden Rd. ~|~21 - Safety~|~C0F94860373BF153108C243B3615B9AAA4354369 98482~|~1~|~1~|~01/S>2/BARB~|~Concrete repairs at Wooster/State intersection. Total replacement of concrete on State Street from just North of Wooster intersection through Hiram Street (100% Local).~|~~|~1C2EB4CC0953DC89FC6D54B55DF2B87BD9639977 98223~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7 (100% State) - No CAP -Annual contract for placement of Fast Dry long line and auxiliary pavement markings in Western District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A1F60E07974AA57A66D6E160BA8C2E547B103B3 96824~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation Funding 4PS7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing of Gue SR 258 00.00 to 11.07;~|~05 - 4R Maintenance - Resurfacing~|~CB0612481B9DE5AE775906553C5F26B87F55BFDF 117207~|~1~|~1~|~01/S5K~|~Pedestrian improvements and signal changes eligible for TAP and Safety funds~|~28 - Facilities for Pedestrians & Bicycles~|~6E18A67D3E599900337F039FC7761E106B312029 117207~|~1~|~2~|~02/S5K~|~Plan Split for roadway resurfacing scope, funded by Small City Program.~|~05 - 4R Maintenance - Resurfacing~|~867E4451CF3B939ED6E37BE005588E70717C0416 94726~|~1~|~1~|~01/S<2~|~Widening the north side of the intersection of McKinley Road, Fortman Drive, and Spruce St (SR 66) along with the relocation of the strain poles on the north side of the intersection, curb radius on north side will be increased, new traffic signal controller installed and storm sewer work as needed.~|~04 - Reconstruction - No Added Capacity~|~CE1430340462EE80580C50E08B7612E5DE6C49D7 113623~|~1~|~1~|~01/IMS~|~Split for noise barrier replacement on the interstate~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C73AB192F5196132779B65C69055154F723D63B2 101001~|~1~|~1~|~01/NFA~|~Extension of Kinross Lakes Parkway 400 feet south of Wheatley Rd to aid the new construction of Nexen Tire~|~01 - New Construction~|~DA743F7824428C4076EC8EA4DA464DC65445C98B 97435~|~1~|~1~|~01/STR~|~Mill 2", pave 3" w/asphaltic concrete, minor pavement repair.~|~05 - 4R Maintenance - Resurfacing~|~C9FA54690956342761B9FC3F01819B3EF2CC4572 97435~|~1~|~2~|~02/ENH~|~100% local items~|~05 - 4R Maintenance - Resurfacing~|~DF57018B1822F72223D6DD61D79E276C1763B26C 93781~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - District Preservation - 4MP7 (100% State) - Annual contract for placement of Spray Thermoplastic Striping within District 5 on IR; US; and SR~|~21 - Safety~|~E3550DCA3D33EB55E8264A0DAC79A8075C22F089 113805~|~1~|~1~|~01/NHS~|~Plan split for Federal/State funded work on NHS.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB26E7BFDBBAC71C914157F2A01C6A2E22E628A5 113805~|~1~|~2~|~02/S>2~|~Plan split for Federal/State funded work for STP.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4BBEAF8F7DD7725CB6B9408B388DA9022998463 111209~|~1~|~1~|~01/ENH~|~Continued extension of a shared use path connecting the Villages of Middleport to the Pomeroy River Walk. Along SR 833 0.33-0.64. Total length is 0.34 miles. Funded 95% Federal TAP (15% TRC)/5% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~C7F346DF45A472693290AED45369BCFD4EB7A09D 111209~|~1~|~2~|~02/ENH~|~Adding a parking lot using Metro Parks Funds at 100% State.~|~01 - New Construction~|~2196AB1CA2F5281CA5B99295B6934DE4C99BE3D3 94805~|~1~|~1~|~01/S<2~|~Shave and pave roadway, ADA intersection improvements. SLM 10.26 to SLM 10.66.~|~~|~CAC2DE37952AB3386DF4BC5B1CF3BD48FC0B6FAF 101716~|~1~|~1~|~01/NHS~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~32A0F1D026890DF30A81F06C86BB162CAF654C57 123563~|~1~|~1~|~01/SAE~|~Replacing R-W/R striping~|~21 - Safety~|~A550AAF5D995C04539A9D3A6A8D82709DA9BC6F3 114417~|~1~|~1~|~01/BRF/KENT~|~Rehabilitation of structure > 20' with superstructure replacement and abutment backwalls.~|~13 - Bridge Rehabilitation~|~B99FA444D7145A8372F82E60F8F661D48B19DAFE 121940~|~1~|~1~|~01/S5K~|~city plan split.~|~21 - Safety~|~E9A2DB680C214D6447571B79F84AC73E6FF73CEE 106107~|~1~|~1~|~01/SAF~|~Work eligible for federal Highway Safety Improvement Program funding.~|~21 - Safety~|~B55958AEF3BD159798888FFCC5531E1E3A0E3CBB 113480~|~1~|~1~|~01/MPO~|~NOACA Funded TLCI portion~|~28 - Facilities for Pedestrians & Bicycles~|~1F7C81E9E9F5B5E20D0B8D95318C4EB661593B3B 113480~|~4~|~4~|~04/S<2~|~District-funded paving in Grafton~|~05 - 4R Maintenance - Resurfacing~|~540BADC5489A6E8470109CE961D85A11284256B3 113480~|~1~|~3~|~03/S<2~|~100% Local items~|~31 - Landscaping & Other Scenic Beautification~|~B74B34254580DA2352ECD33C9344A140C8FDF3FF 113480~|~1~|~2~|~02/SAF~|~Safety items~|~21 - Safety~|~3A352E5ED88F45C99E410EA3C6D98157AEFDC48D 96499~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2019. MOE 78 8.35-14.25, MOE 800 0.00-8.72 and MRG 60 0.00-5.65. Rural other federal aid funded 80 federal/20 state.~|~21 - Safety~|~381A489D0BD8D9FB72D0786BDE75337605096D7D 109467~|~1~|~1~|~01/IMS~|~Replace DMS signs on FRA IR 270 and IR 670~|~21 - Safety~|~4A2924C8DEDEED8ACCF9577509C037A210FFE803 109467~|~1~|~2~|~02/NHS~|~Replace DMS signs on FRA US 23 and US 33~|~21 - Safety~|~1FFB26C747C8676A34177C1B8BC4051A11B7B67C 110374~|~1~|~1~|~01/MPO~|~Construction of pedestrian facilities on both sides of Kemp Road between both Grange Hall Road intersections.~|~28 - Facilities for Pedestrians & Bicycles~|~5494C54C7484B7E3D0B49C2A07343ACC38DFA73F 102473~|~1~|~1~|~01/STR~|~Microsurfacing of CAR-644 and COL-644~|~05 - 4R Maintenance - Resurfacing~|~83BE963DDD6C0671B22FB60C4CC46C413595112D 93237~|~1~|~1~|~01/BRF~|~Removal and replacement of the existing Helena Street Bridge over the Great Miami River with a new bridge on Helena Street over the Great Miami River. SFN 5760437~|~10 - Bridge Replacement~|~51C9D2E3BAFD79819681733DA2F55BC81FDA4B90 108902~|~1~|~1~|~01/ENH~|~Construction of a shared use path connecting the Villages of Middleport and Pomeroy. Funded 95 federal/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~820A875D2A91170DE00CF85A612D57081D4614BB 105247~|~1~|~1~|~01/STR~|~Resurfacing JEF-151~|~05 - 4R Maintenance - Resurfacing~|~0CE14D6ADE7CC4EF357593632E69A86A41A94D01 123811~|~1~|~1~|~01/IMS~|~All work associated with the resurfacing of IR 71. ~|~05 - 4R Maintenance - Resurfacing~|~A5EA48DE75B426388019B8CCC915B55CFC2B5054 107701~|~1~|~2~|~02/S5K~|~Resurfacing work on SR 697 within the Delphos urban area from SLM 5.495 to 6.573.~|~05 - 4R Maintenance - Resurfacing~|~8295C54CFBF36CCFEE8CFB1AF08D6A9C9BD346CD 107701~|~1~|~1~|~01/STR~|~Resurfacing on SR 116, SR 117, and a portion of SR 697 using district preservation funds (80% 4PF7 and 20% 4PS7). All within the Rural roadway classification.~|~05 - 4R Maintenance - Resurfacing~|~33CD161D6D3383CFF99C55DDA77FCDB7F63FB4E7 83919~|~1~|~1~|~01/ENH~|~Extension of Marietta River Trail Bike/Ped path, approximately 0.97 miles beginning at Fourth Street and ending at Jefferson Street. Includes Enhancement, CMAQ and Local funds.~|~28 - Facilities for Pedestrians & Bicycles~|~B3B59874E228D846A2B5CAC409E0377FDA68180D 99862~|~1~|~1~|~01/STR~|~Replace bridge deck. Investigate semi-integral conversion. Paint steel superstructure and seal all concrete surfaces.~|~10 - Bridge Replacement~|~85FB0FBCD0F2C6792A02E03789C4845E6D4FD167 121618~|~1~|~1~|~01/S>2~|~Bike lane~|~28 - Facilities for Pedestrians & Bicycles~|~E27924D1286451E74438DCE922167323FF91793F 98772~|~1~|~1~|~01/S<2~|~Winton Road: from Fleming Road to Sarbrook Drive. Rehabilitation of pavement; widening of pavement to provide left-turn lanes at several locations; rehab/repair and, as necessary, replacement of curbs, storm sewer system, and walks; traffic signal improvements.~|~21 - Safety~|~F3930C94B3C355EC7194FB69C007BAED043FACE9 98772~|~1~|~2~|~02/S<2~|~100% locally funded waterworks improvements being constructed in conjunction with this project.~|~43 - Utilities~|~B46EE1C5D0C8584E1EB14893B62E20178A4B6432 123645~|~1~|~1~|~01/NFP~|~Plan split for pavement marking throughout the district~|~21 - Safety~|~79EE2F68B0C0CCEF2CC9FBC34329C4DBC2F5956F 87347~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - CAP for CO & CE = $2,381,000.00 - Removal of approximately 1,200 feet of existing cut face; construction of steel wire mesh and erosion control items; improved rockfall catchment areas along the shoulders; incidental pavement and drainage items on GUE US40 14.29-14.48~|~04 - Reconstruction - No Added Capacity~|~B5411327B7F4554FC772FA725BC66FDCCB15CA3D 82088~|~1~|~1~|~01/BRF~|~SFN 5060524 West Avenue Bridge over mahoning river~|~~|~81B602DD51A1D6D15563EAD7CE0501B4289A55EE 89832~|~1~|~1~|~01/NFP~|~Resurfacing / Mill and Fill~|~44 - Other~|~EE6CDE101CE40ABF9B4C7FC03F1EEA6EF68C9870 98015~|~1~|~1~|~01/NFA~|~Emergency Type B landslide repair. MOE 724 0.15. Not on any federal aid system. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ABC448AA09B06E5627596D37862D60C984BC5D9D 113699~|~1~|~1~|~01/STR~|~MAR-47-2.45 to 2.95~|~05 - 4R Maintenance - Resurfacing~|~AF3AFDB376AD89585B6B82A5C051CD8CEDFB7727 88766~|~1~|~1~|~01/STR~|~Replacing existing structure SFN 7501080 SHE 65 0863 over the Muchinnippi Creek.~|~10 - Bridge Replacement~|~11BBFCCF0E60DD9BD182FFD531236531AA6018A9 88766~|~1~|~2~|~02/STR~|~Rehabilitate pier piling encasements, rebuild deck edges using annodes, and reface abutments undin annodes on SFN 7501056 SHE 65 0757 over Jackson Center Ditch.~|~13 - Bridge Rehabilitation~|~35C58B0767E5B7BB4B1BE6B5E1D1372626CBC894 101833~|~1~|~1~|~01/STR~|~Loop Detector Repair~|~44 - Other~|~BF9B3849C7E0FC4148961E8E7C207F18E08A1617 101833~|~1~|~2~|~02/SAF~|~LOR-20/58 Replace traffic signal cabinet, replace signal heads ERI-250/Kalahari pedestrian facilities & highway lighting~|~21 - Safety~|~1FF5B297B9B6C108592FD13B0C3B7FE04D7A6173 96296~|~1~|~1~|~01/ERD/BATH~|~Construction of an entrance sign, gravel drive, parking area, bike racks, visitor information kiosk, shelter, restroom, trail loop, picnic area.~|~30 - Scenic or Historic Highway Programs~|~15AB578AB804DC4BC4514F9C2069A3CA583F17F2 117454~|~1~|~1~|~01/ENH~|~Funding to cover construction of bike trail~|~28 - Facilities for Pedestrians & Bicycles~|~79B0D266DE76E6BD5E6172B27AD6DB8A9B624DB8 87182~|~1~|~1~|~01/STR~|~7306210 SCI SR776 0.19 Intersect: Stream80 Fed/20 state 01/STR/BR/State~|~01 - New Construction~|~F1BFA5F175150B7416DEE954A7D98B8FF86011C7 110451~|~1~|~1~|~01/IMS~|~plan split for resurfacing on the interstate locations~|~05 - 4R Maintenance - Resurfacing~|~10BA924BE28A5ED6EB796306E0FE0051AF356FCD 108770~|~1~|~1~|~01/NFA/BUCK~|~Buckeye Lake Municipal Bridge Funds - 5MP7 (80% Federal) / 4BG7 (15% TRC / 4BG7 (5% Local) - See CAP Comment - Replacement of bridges (SFN 4560002 & 4560003) carrying Commercial Drive over West Weir Run.~|~10 - Bridge Replacement~|~43493A8DFCBC25BF91C6E3E8589699087E58042F 108770~|~1~|~2~|~02/ENH/BUCK~|~Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - Sidewalks and Drainage on 1) Lic-SR 79-03.64 to 04.10;~|~28 - Facilities for Pedestrians & Bicycles~|~D4FAE213CA51B3A0915A785B2721569E2C6A2273 87418~|~1~|~1~|~01/ENH~|~Project consists of aesthetic improvements to the I-75/SR-123 interchange. These improvements include installation of trees, shrubs, grasses, and landscape bedding placed according to ODOT's highway landscaping guidelines. In addition, a gateway sign for the City of Franklin will be installed, designed in a manner compliant with ODOT regulations.~|~31 - Landscaping & Other Scenic Beautification~|~73C03D448AB66146570EEAAD698FBAD450058BC1 21478~|~1~|~3~|~03/NHS~|~"03/NHS/OT/ " - District Preservation Pavement Marking 4MP7(100% State) - No CAP - General System resurfacing on KNO SR13 20.80-23.10~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3334E64E0EB7E103538191B3BCCE6FB8973C2F81 21478~|~1~|~4~|~04/STR~|~"O4/STR/PV/ " - District Preservation Pavement Marking 4MP7(100% State) - No CAP - Pavement Marking for the Resurfacing on 1) KNO SR95 5.69-11.5; 2) KNO SR546 0-2.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~87ED8CB79F2AB4023E334C4118BEA0C0E6182441 21478~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) KNO SR95 5.69-11.5; 2) KNO SR546 0-2.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B67431935550505016233027DA68868DDBFF624 21478~|~1~|~1~|~01/NHS~|~"O1/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - General System resurfacing on KNO SR13 20.80-23.10~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F5D979BFCBF6526A8E0325B73F75B27391876296 121596~|~1~|~1~|~01/NFA~|~Bridge Painting~|~13 - Bridge Rehabilitation~|~1ABFD2392B7947AD84371E6110BFDF961F8B1E71 91860~|~1~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replace single span slabs with concrete box culvert on 1) 3003574 GUE SR146 2.56 Intersect: Over Br Buffalo Fork #: BR Eligible: Length=20 SD/FO(1) SR=44.5 DSR=6; 2) 3003604 GUE SR146 3.42 Intersect: Over Br Buffalo Fork: Not BR Eligible: Length=22 SD/FO(1) SR=41.8 DSR=4;~|~10 - Bridge Replacement~|~07A039BBA919FD264D3C27477BA796D86E5E2FC1 91860~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replace single span slabs with concrete box culvert on 1) 3002349 GUE SR83 7.32 Intersect: Over Br Flat Run: Not BR Eligible: Length=13 SD/FO(1) SR=51.6 DSR=4;~|~10 - Bridge Replacement~|~E6597DF3A62C2589B848FB42733497BA0EB7E4E2 95303~|~1~|~1~|~01/ENH~|~This project consists of constructing an extension of the Great Miami River Bikeway from Edwin C. Moses Blvd. (CR 621) to West River Road.~|~28 - Facilities for Pedestrians & Bicycles~|~DAAA954FCC5D86D449F187C09F68D2757AD1E7E8 104804~|~1~|~2~|~02/ERD~|~Wendy Park Bridge Project~|~08 - Bridge - New Construction~|~2BF1938DB29E602AE52E266D23424EFFF8345B3E 104804~|~1~|~3~|~03/ERD~|~Whiskey Island Connector Project~|~28 - Facilities for Pedestrians & Bicycles~|~0D5CE86D67C9908F37C20DF36FA15F0DB5A0E5E7 104804~|~1~|~1~|~01/ERD~|~Lakefront Canal Basin Links Project~|~28 - Facilities for Pedestrians & Bicycles~|~20E1EDEB268EAB827470F5706941D49793FAA0D8 104804~|~1~|~4~|~04/ERD~|~Redline Greenway Trail Projecto TIGER Grant eligible for Phase 1 & 2o MPO CMAQ eligible for Phase 1 & 2~|~28 - Facilities for Pedestrians & Bicycles~|~08ABEB620079F3E64FC492C60F3587B0BCFA4D66 104804~|~1~|~5~|~05/NFP~|~Wendy Park Bridge Project - Non-Eligible~|~08 - Bridge - New Construction~|~50C6461A1B310B77045780A7B3DAAD92AD0CDC9D 122043~|~1~|~1~|~01/NHS~|~added plan split.~|~13 - Bridge Rehabilitation~|~4A2FEB1927A562583D0005FF5136A2A68DBF5D90 108336~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MOE 537 2.10. DSR MOE-017. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~347C767EC32C6B63FC5D1589929071609215ACB1 110148~|~1~|~1~|~01/STR~|~Replace deficient bridge.~|~10 - Bridge Replacement~|~D730A75C0DD580B3C2CAEAAEFFE697FFD8E019A2 124414~|~1~|~1~|~01/IMS~|~Four lane resurfacing project using an asphalt overlay treatment. NOB 77 11.19-18.89.~|~05 - 4R Maintenance - Resurfacing~|~0DDCB8F45EB2B4FC726EA13429C2D088384502CD 92725~|~1~|~1~|~01/NFP~|~Consultant construction inspection~|~17 - Construction Engineering~|~80CA25101EC9E6EB5C712EE9588EA06C65EB4406 119968~|~1~|~1~|~01/MPO/BEAV~|~Plan split for MVRPC STP funded portion of project with 25% local match.~|~05 - 4R Maintenance - Resurfacing~|~4F5E89179035DAE87A04E6F60876A1D0DE75213E 93135~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6001262 MUS US40 9.4 Intersect: Ramp D Over Timber Run; BR Eligible for Rehabilitation: Length=99 SD/FO(2) SR=66.6 DSR=5~|~13 - Bridge Rehabilitation~|~AE3861A93132D90817F8C223D42D26F854348CB9 109112~|~1~|~1~|~01/BRO~|~All work in this project is in this plan split. Funds are from the District Preservation Program budget 80% federal and 20% state funds.~|~~|~17D5C3DC3B25FF5DFF078028C02434B51FC955DB 87036~|~1~|~1~|~01/S>2~|~The project will improve the S-curve from McMicken Ave. to Dixmyth Ave. on West Martin Luther King Jr. Drive by improving the geometry, constructing the proper superelevation, and adding left turn lanes where needed. The project will increase turning capability at Dixmyth by making the existing left turn lane from EB MLK to Dixmyth longer. Bicycle accessibility will be improved with the inclusion of a bikeway. Pedestrian safety and accessibility will be improved by reconstructing pedestrian islands at Clifton Ave. and MLK. Turn lanes at Clifton and MLK will be added to increase capacity. Upgrades to signals will also be necessary. Sponsor - Cincinnati~|~21 - Safety~|~21262FBC6591104CD1433FE7BC489F5747CAA927 109662~|~1~|~1~|~01/STR~|~Resurfacing JEF-152~|~05 - 4R Maintenance - Resurfacing~|~2F312BF99362976DF2B7642FEEC594D023334827 109662~|~1~|~2~|~02/S5K~|~Resurfacing SR 152 from SLM 6.45 to SLM 8.98~|~05 - 4R Maintenance - Resurfacing~|~5CC09FCF2CE83AE9D01863F4962272869C1AF552 89445~|~1~|~1~|~01/IMS~|~Lighting Maintenance~|~44 - Other~|~B3A1CD980B0485D38D701FF776F450AF9DF9FEC4 125646~|~1~|~1~|~01/NFP~|~All work is included in this plan split. ~|~47 - Bridge Preventive Maintenance~|~5C8CF4868C142117F377F752EE74E3D4617401E0 91725~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 690 0.75-0.79. Federal/State 80/20%. DSR ATH-014.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B31371782DD01C9EAF67ABC22E59C45FF84C090 110939~|~1~|~1~|~01/IMS~|~Install a culvert lining.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1F5B91EB819C4289B799403EBC70B63E708A3D99 91516~|~1~|~1~|~01/NHS~|~Marion urban pavingSR-95: 14.25-14.77, 16.11-16.94SR-95D: 0.01 - 0.89~|~05 - 4R Maintenance - Resurfacing~|~7E530BAE5621C3F8995A469830D871FD94FFC3F4 91516~|~1~|~2~|~02/NHS~|~General system paving MAR-95-16.94 - 17.18~|~05 - 4R Maintenance - Resurfacing~|~C3F8E4107043562DD78E16D54CA6C64A39ACE914 91516~|~1~|~3~|~03/NHS~|~Additional items not covered under Urban Paving such as pavement repair, curb, curb ramps, guardrail, signals, etc. to be funded with Marion's Large City funding.~|~05 - 4R Maintenance - Resurfacing~|~49C52D0666EA41BE2D939711EB8FBE3394E45A13 101686~|~1~|~1~|~01/NFP~|~Fast dry pavement marking on various routes in District Six~|~21 - Safety~|~32767CCD08986AABFCB94D31083E45DEEFB8C523 96497~|~1~|~1~|~01/BRF/Zane~|~"01/BRF/BR/ZANE" - Replacement of deficient bridge w/in the City of Zanesville utilizing Municipa Bridge funds (4B87)approved for FY16 a for a federal max of $400,000~|~10 - Bridge Replacement~|~69D72CAB383310357B13D4E6D6B78281267AE825 102021~|~1~|~1~|~01/S<2~|~Bridge overlay and other associated bridge items.~|~13 - Bridge Rehabilitation~|~9E668294DBA4EE606189798D4E6E0AF388649763 97245~|~1~|~1~|~01/IMS~|~Plan split for bridge replacement: 1808761~|~10 - Bridge Replacement~|~822BA28C458F4B8ADA90B4F45A77B3AD08353B46 108771~|~1~|~1~|~01/BRF/PCEO~|~CEAO Federal/State Exchange Program - 4C87 (80% State Exchange) / 4BG7 (20% Local Match - CAP (See comments) - Replacement of Per-CR 26-03.65 SFN 6430929 Rush Creek Road over Little Rush Creek~|~10 - Bridge Replacement~|~2B4B2B00721133098E07D004FAC3421DA31D8EC9 124066~|~1~|~1~|~01/NHS~|~Emergency repairs to the concrete deck overlay.~|~47 - Bridge Preventive Maintenance~|~D412D41D8CA0FE463FEF63AC567B192654B2CB5F 119805~|~1~|~1~|~01/NHS~|~Improve the intersection of US 23 and Coover Rd (TR 194)~|~21 - Safety~|~1AD39A5C63CF0A2FE5158F4C77148FF64AD8A8B2 120392~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~5E26D783518836E4121779D77339FC17C72EE61B 124068~|~1~|~1~|~01/ENH/STPK~|~Replace bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~D102084AB0B968C8878C51DD3DE61124879B9443 109412~|~1~|~1~|~01/NHS~|~Signal work~|~44 - Other~|~67E7A1D80A2415FBDC9984494D44DF9118505C1C 105839~|~1~|~1~|~01/IMS~|~All items of work associated with Spot Repairs on Interstate 270 and associated interchanges within the project limits.~|~05 - 4R Maintenance - Resurfacing~|~A8561BE6DBB943CB41295328AEFDD7E0C50B2D3B 103372~|~1~|~1~|~01/S>2~|~Concrete maintenance on Meridian Road between the I-680 interchange ramps.~|~05 - 4R Maintenance - Resurfacing~|~4FD734EDD31E3F53335CAB935F296CC3473320C8 119118~|~1~|~1~|~01/NHS~|~Culvert maintenance and storm sewer replacement.~|~66 - Resilience Improvement - Highway Project ~|~FFAF8F10035A764E7EF7FFBFAA133CAB11BEEF21 91907~|~1~|~1~|~01/IMS~|~MRW-71 from 12.20 to 19.92~|~05 - 4R Maintenance - Resurfacing~|~CB617E01C060E4B2DB5AF2A27273051B1D7AB57D 105308~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridges.~|~13 - Bridge Rehabilitation~|~8819044E3B13FCBBFEE3D7306DAA2A95066743D2 122157~|~1~|~1~|~01/NFP~|~Plan Split for MAP Grant funded project. Will be funded at 100% to account for credit given the LPA for funds already paid on prior phase of this project.~|~44 - Other~|~C4B058F87BFF0BBE55CF27F784EFFF1ACBCC6E39 105478~|~1~|~3~|~03/IMS~|~Repair of WAR-63-0010 Collision damage to barrier and fence.~|~13 - Bridge Rehabilitation~|~744CE0F83387A23B256EFEB60B4E9DE3DA69261C 105478~|~1~|~1~|~01/IMS~|~Plan split associated with all work on Interstate Bridges HAM-75-1747, HAM-71-0320, HAM-75-0089 and HAM-471-0030R. This plan split includes the alternate bid for aesthetic fence as requested by the locals or a non-repetitive pattern on the concrete barrier-SFN: 3111261.~|~47 - Bridge Preventive Maintenance~|~F20738BB9E6D6C9BF3C42CE6BB449D2C92019D18 105478~|~1~|~2~|~02/NHS~|~This plan split is for all work associated with the following NHS bridges (BUT-27-0601, HAM-32-0127 and HAM-22-0622).~|~47 - Bridge Preventive Maintenance~|~ADC4FC47F1B134BCAE5818737E13C5DDDC73B29C 90193~|~1~|~1~|~01/NHS~|~Lighting Maintenance - LOR US 20/SR 301 - US 20/Grafton Road - LOR SR 10/SR 83C~|~~|~31A00A6FF43C7F9EAF342A02657674BB56CFC69F 90193~|~1~|~2~|~02/S<2~|~Lighting Maintenance - LOR US 20/SR 57 Interchange~|~~|~749E0A64563BBBB28A3E524BE2BF557826C3D49C 123590~|~1~|~1~|~01/IMS~|~Plan split for Interstate. ~|~05 - 4R Maintenance - Resurfacing~|~903B457F9003F05F7FE7407AC67A3E02044A61E0 94902~|~1~|~1~|~01/NHS~|~Culvert Replacement/Rehab~|~44 - Other~|~FF96EF05909C6B8791E75402A763BBB341DBE75F 111620~|~1~|~1~|~01/NFP~|~Spot paving on various routes within POR, STA and SUM Counties.~|~05 - 4R Maintenance - Resurfacing~|~FEE37BBBD3CA918638A03BC91F8EDCFB4B7B4A9E 114029~|~1~|~1~|~01/NFP~|~Reed Road over USR 30 was hit on Monday 9/14 by a lowboy carrying a piece of equipment on westbound USR 30. There is damage to three of the six beams on the bridge.~|~13 - Bridge Rehabilitation~|~13F21FAB87A14FAA3CEEE4BB234900CCBB65EA3D 116164~|~1~|~1~|~01/BRF~|~Bridge replacement in Pike County.~|~10 - Bridge Replacement~|~0DFB0771C6975C67BB6CC83D7733CC42CE820A36 124292~|~1~|~1~|~01/ENH~|~Primary plan split for TAP/Safety funded sidewalk scope~|~28 - Facilities for Pedestrians & Bicycles~|~4746568435EF0922663D7695B48CA28B9ACFE028 116142~|~1~|~1~|~01/NFA~|~Pump station rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7AEE612BC8AAC49303FAC0CDC32B86BE52E6FC2B 126140~|~1~|~1~|~01/STR~|~All work is in this plan split ~|~47 - Bridge Preventive Maintenance~|~90D2199F4269DE2A880F3FC5ECFF3F643B697F23 101364~|~1~|~1~|~01/IMS~|~This split is for Interstate bridges.~|~47 - Bridge Preventive Maintenance~|~616A665D1D68E60587BEBB7F4CC1CAD684AEF6E2 101364~|~1~|~2~|~02/NHS~|~This plan split is for NHS bridges~|~47 - Bridge Preventive Maintenance~|~5A14B31DF147A2D46E70A6F945AE1B8D55A69260 114083~|~1~|~1~|~01/SAE~|~Install new and upgrade existing pavement markings on various county roads.~|~21 - Safety~|~629A3D7D6DDE378FAC04097FB6266673B9FDDC22 119496~|~1~|~1~|~01/NFP~|~Landscape maintenance at various interchanges.~|~44 - Other~|~6FE8B69ADF37849F51E9E9FEA2F49F767921972D 105372~|~1~|~1~|~01/BRO~|~Remove asphalt wearing surface, perform hydro-demolition, place new rigid concrete overlay. Upgrade railing, install VPF and repair expansion joints.~|~13 - Bridge Rehabilitation~|~5E9312B8E9E7E358AD84F2A6377813660A9A988D 80955~|~1~|~1~|~01/ERD~|~Earmark funding (using TRC) for all work on this project.~|~28 - Facilities for Pedestrians & Bicycles~|~B4A799F6FECD751C5249147E5BE20DF8A14314A0 102161~|~1~|~1~|~01/NFA~|~Replace structure over Squaw Creek in the City of Girard, Trumbull County, Ohio.~|~10 - Bridge Replacement~|~72E9ECA0473AB51456C2FF3625475C9254064F17 89141~|~1~|~1~|~01/NFA~|~Improve an existing drainage problem on Cookie Lane within the Timber Hill Reservable Area of Rentschler Forest Preserve by installation of concrete pavement with in an area of the lane that is subject to flooding.~|~44 - Other~|~7853B0684EB2A6BED925A2857382D67DCE463EFE 106398~|~1~|~1~|~01/BRF~|~Plan Split~|~13 - Bridge Rehabilitation~|~563EB482A1522E214C1235EE1C28D10039D05CA6 108791~|~1~|~1~|~01/S>2~|~Intersection Improvement~|~21 - Safety~|~7C98893E184B33B07D99B380625E4330A91C90B7 84475~|~1~|~1~|~01/STR~|~This plan split is for the rural routes. These routes include: BUT-128 (from SLM 1.62-7.50), CLE-28 (from 9.09-12.94), CLE-222 (from SLM 19.41-24.17), CLI-73 (from SLM 2.32-6.24), and WAR-741 (from SLM 5.09-6.82 and 8.10-13.82)~|~05 - 4R Maintenance - Resurfacing~|~3EA09F51BE623CAB1A98E59B18F7C04FE1454F8E 84475~|~1~|~3~|~03/NHS~|~This Plan Split is for the NHS routes incldued in the project. These routes are: BUT -27, CLE-125, and CLI-73 (from SLM 0-2.32)~|~99 - State Preventative Maintenance~|~7C68ED828C9B6321732098771B5AB0D2BC1FC79E 84475~|~1~|~2~|~02/S>2~|~This plan split is for the urban routes included in the project. These routes include: BUT-126, BUT-128 (from SLM 1.56-1.62), CLE-28 (from SLM 4.97-9.09), CLE-222 (from SLM 24.17-25), and WAR-741 (from SLM 5-5.09 and 6.82-8.10)~|~47 - Bridge Preventive Maintenance~|~9959972B70EC08BD5685561E04F0086086C3811B 101573~|~1~|~1~|~01/NHS~|~DSR# JEF-009~|~04 - Reconstruction - No Added Capacity~|~F9CA6F32F3ED86254CE29196ADA222E32B23B314 119690~|~1~|~1~|~01/MPO~|~Plan split for roadway resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E6BB1665F668AF369A484C3C3629AF82C4189453 119690~|~1~|~2~|~02/NFP~|~Plan Split for work items not eligible for federal reimbursement, 100% Local~|~05 - 4R Maintenance - Resurfacing~|~B6CB2333D64DEDDFEC5FD26EB254E3ABD9A3C947 119890~|~1~|~1~|~01/STR~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~532DECBFEC98328936DA97607AFB078F5D8635C6 101214~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split 1 created for the following STP Rural routes: MAD-29-10.61-13.01 MAD-38-0.00-12.39 MAD-41-0.00-3.85 MAD-207-1.13-1.39 MAD-323-0.00-0.28~|~05 - 4R Maintenance - Resurfacing~|~057E3E843309ED5516147FF9F1ED8D0AA74F9C00 101214~|~1~|~3~|~03/STR~|~CO CO Engr 01 plan split 1 created for the following STP Rural routes: MAD-29-10.61-13.01 MAD-38-0.00-12.39 MAD-41-0.00-3.85 MAD-207-1.13-1.39 MAD-323-0.00-0.28~|~17 - Construction Engineering~|~F225BDF4380D1C878DA17271DA2249EB30101C74 101214~|~2~|~2~|~02/NHS~|~CO CO Contr 02 plan split 2 created for the following NHS routes: FAY-62-14.60-26.74 MAD-62-0.00-1.10/1.23-1.44 PIC-62-0.00-7.64~|~05 - 4R Maintenance - Resurfacing~|~328DF14967456B3AB84A8EB9CAEE434F3A801880 101214~|~2~|~4~|~04/NHS~|~CO CO Engr 02 plan split 2 created for the following NHS routes: FAY-62-14.60-26.74 MAD-62-0.00-1.10/1.23-2.39 PIC-62-0.00-7.64~|~17 - Construction Engineering~|~FDE5031839A087C6C10C623D615B6CEBC5E5D423 97616~|~1~|~2~|~02/BRF~|~Replace PIC-CR-9 3.88 over Scippo Creek SFN 6533841~|~10 - Bridge Replacement~|~05B2554455D69DFE0430B7A83BF2DD6D54C34D5D 97616~|~1~|~1~|~01/BRF~|~Replace PIC CR 8 2.29 bridge over Slate Run SFN 6532160~|~10 - Bridge Replacement~|~9AB27384E19DBBD994830709BA7A16283F70A2FF 121254~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~AE0743825416EB2820C62B3D14775B386670B535 97437~|~1~|~1~|~01/SAE~|~Upgrade pavement markings on various county roads w/in Ashland County.~|~21 - Safety~|~5BA6E9474356D58EB7AB9CF5FBDEDEF52F65B515 99817~|~1~|~1~|~01/NFP~|~Construction consultant engineering task order of D10 projects for FY2016.~|~17 - Construction Engineering~|~D5F53A5D658BEE2E30276B70CA4FC06AFE65063F 109902~|~1~|~1~|~01/STR~|~Resurfacing of SR66 and SR 637 in Paulding County using 100% district capital allocations.~|~05 - 4R Maintenance - Resurfacing~|~45EE67D1BA20E557F8CD3D5778E6DE7902C4007D 93658~|~1~|~1~|~01/SAE~|~Intersection improvements for bicycle and pedestrian safety at the intersections of SR-289 and Wood and Walnut streets. Funded totally with Safe Routes to Schools dollars.~|~28 - Facilities for Pedestrians & Bicycles~|~FAE7BA7D060F6827F9223E9C417BA623C59CF3BE 87927~|~1~|~2~|~02/S<2~|~Systemmatic guide sign replacement; mainline and ramps on DAR US 36 11.50 to 13.08 (DAR US 127 from US 36 to Childrens Home Bradford Road), DAR 127 SLM 13.16 to 15.89, and LOS 540 SLM 1.28 to 1.84.~|~21 - Safety~|~6E39A7DAC8D48510FF7C95C3D01C0A2A52279233 87927~|~1~|~4~|~04/IMS~|~Systemmatic guide sign replacement: MIA IR 75 SLM 3.74-3.76, and AUG IR 75 SLM 4.77-4.79~|~21 - Safety~|~6F42E4EE7A8AEF5932201F2B56E4FAA089A69257 87927~|~1~|~3~|~03/STR~|~Systemmatic guide sign replacement; mainline and ramps on DAR 127 15.89 to 16.80; DAR US 36 9.61 to 11.50; DAR 121 SLM 18.83 to 18.93, LOG 117 SLM 6.64 to 7.09, LOG 292 SLM 0.00 to 0.50, LOG 347 SLM 0.32 to 0.57, and on MER SR 29 15.58 to 18.80.~|~21 - Safety~|~C4724B5D5C8A9E8DB0E8BBE09298F6DB38BFCFDC 87927~|~1~|~1~|~01/NHS~|~Systemmatic guide sign replacement; mainline and ramps on LOG US 33 SLM 9.78 to 29.69, LOG 68 SLM 9.41 to 9.69, and DAR 49 SLM 13.92 14.41.~|~21 - Safety~|~FA08C540C6EDAE6A8C5E0EF684ED3DF701D3F6DF 104744~|~1~|~1~|~01/SAE~|~100% HSIP funding from the CEAO up to the cap. The amount over the cap will be provided by Putnam County. The County is not seeking cost recovery for Construction Engineering for LPA projects so all the federal funds will be used in the Construction Contract subphase.~|~21 - Safety~|~0B10D8133DEDB314B1E99E8FD32AEF1258D2A7AB 101418~|~1~|~3~|~03/S<2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~06BEB2225239A05C76D7F8E05791B8FCB4B32CCB 101418~|~1~|~4~|~04/S<2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~2AEFDB13CDADCFA6917D00BC589D3EA12EAB7EAA 101418~|~1~|~1~|~01/S<2/ALLI~|~Resurfacing, urban paving in the City of Alliance.~|~05 - 4R Maintenance - Resurfacing~|~47D1FC597AC784B1386BEBAC78025BACCBD2167D 101418~|~1~|~2~|~02/S<2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6BDF7822527CC52D4BF7FF72BC64E1D1EEB115C2 101418~|~1~|~5~|~05/S<2/ALLI~|~ADA curb ramp installation, full and partial depth repairs, manholes adjusted to grade and catch basin reconstruction.~|~05 - 4R Maintenance - Resurfacing~|~9ED080EE0DA254F66F64D42CC0D4ACA105143B82 101418~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~2977C6DFCAD1D16DFE6B91180534231235D1F0AC 93975~|~1~|~2~|~02/NFP~|~This split is for all work items related to the new water and sanitary lines.~|~~|~7B3EF6BBD425672632CCA87E2077FFAE6CBB1E28 93975~|~1~|~1~|~01/S<2~|~This split is for all work items except new water and sanitary lines.~|~04 - Reconstruction - No Added Capacity~|~D0238F5E58B5F4B3561CF4EE95BB23B8E2D30656 120090~|~1~|~1~|~01/SAF~|~Roundabout at Dimmick Rd and McCauly Rd~|~21 - Safety~|~3704CE678E6814BC74DAEC4CD6A752D7A6309709 115526~|~1~|~1~|~01/SAE~|~Installation of cable barrier along US 33 median in D5 and D6.~|~21 - Safety~|~B269CABF9B53ABDE68E2095F466CE16381AC6C4D 100914~|~1~|~1~|~01/NHS~|~Microsurface US 33 in Auglaize County. AUG SR 33 SLM 6.60 to 15.16~|~05 - 4R Maintenance - Resurfacing~|~A843659F9D6A2F896DB383788552A5181D183D8C 118816~|~1~|~1~|~01/STR~|~All work included in this split.~|~05 - 4R Maintenance - Resurfacing~|~5423CBA81991881718606E57839A209216605AB2 123423~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~D7EB5E078542D8924EAC591E013B6573407E9A84 108147~|~1~|~1~|~01/SAF~|~Plans Split~|~21 - Safety~|~1BD3C4072757E366A2D82BC14F4BDE70802C2501 108147~|~1~|~2~|~02/S<2~|~Split for 100% LPA funded Landscaping items~|~21 - Safety~|~C12295E179E9210AC2FA3D18095E82214FE93234 97164~|~1~|~1~|~01/NFP~|~Construction of a parking lot by the Ashtabula Metroparks.~|~44 - Other~|~BC2F23345EDC6E934BA0A96BD91EB361C80CE818 98470~|~1~|~1~|~01/STR~|~LOR-58-0.00-8.42 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~288FA36581CC01255AE903E5C412B4965CE1BF7B 79975~|~1~|~1~|~01/NHS~|~PIK US23 from 0.00 - 5.25It is proposed on US23, to resurface the highway begining @ the Scioto Co. line then north for 5.25 miles and terminate just past the A Plant entrance ramps. Project includes the resurfacing of Interchange #074200 (4 ramps).80/20~|~05 - 4R Maintenance - Resurfacing~|~3F4BF22B7AE035E38F50D2A6CB0B7438864CA2CB 79975~|~1~|~2~|~02/NHS~|~Brdgs for RehabBridges True Log Point Overall Length 6600123 PIK -US -23 3.950 240.0 6600077 PIK -US -23 0.000 92.3 6600182 PIK -US -23 4.700 198.0 6600093 PIK -US -23 3.950 255.0 6600158 PIK -US -23 4.700 198.0 6600115 PIK -US -23 0.000 16.0 6600042 PIK -US -23 0.000 92.3 ~|~13 - Bridge Rehabilitation~|~AFBC3160E2754B62D535A5A9A4FF494E5EC0DFAB 121949~|~1~|~1~|~01/SAF~|~Install accessible pedestrian signals. ~|~21 - Safety~|~34186CF455B3306B3F0FEC0D0C09322E9B9028DD 76425~|~1~|~2~|~02/NHS/NEWA~|~"02/NHS/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic SR 16 23.76 -24.27; Originally Urban Paving but new Classification maps and Urban Paving Guidelines changed the responsibility.~|~05 - 4R Maintenance - Resurfacing~|~07FED240541D0443644E50789FD110F98C7386B9 76425~|~1~|~6~|~06/NHS/NEWA~|~"06/NHS/OT/NEWA" - District Preservation 4PS7(100% State) - No CAP - Striping after resurfacing on Lic SR 16 23.76 -24.27; Originally Urban Paving striping but new Classification maps and Urban Paving Guidelines changed the responsibility.~|~05 - 4R Maintenance - Resurfacing~|~24B6D61A14E5BD5FA833E27295D20A9F6638DBDF 76425~|~1~|~7~|~07/NHS~|~"07/NHS/OT/ " - District Preservation 4PS7(100% State) - No CAP - RAP Hauling from millings on 1)Lic SR 16 24.27-33.14; 2) Mus SR 16 00.00-00.33~|~05 - 4R Maintenance - Resurfacing~|~3E0F42CF859AAFB59A56C7592591C162EE50CEDD 76425~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1)Lic SR 16 24.27-33.14; 2) Mus SR 16 00.00-00.33~|~05 - 4R Maintenance - Resurfacing~|~45F208678422146926151585FC1D1B4D1FBB884B 76425~|~1~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Bridge Rehabilitation on 4501411 LIC SR16 29.3 Intersect: Sr16 Ovr Rocky Fork Crk # Length = 145' SD/FO (1) SR=72.1 DSR=6. Bridge is BR Eligible~|~13 - Bridge Rehabilitation~|~59EB584A8801C8AB05CB212EC75806A85ABB54FD 76425~|~1~|~4~|~04/NHS~|~"04/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Bridge repairs on 4501381 LIC SR16 29.3 Intersect: Sr16 Ovr Rocky Fork Crk # Length = 145' SD/FO (0) SR=94.3 DSR=7. Not BR Eligible~|~13 - Bridge Rehabilitation~|~9A460A746DC54936F79BB8E3ADC80249C0A61873 76425~|~1~|~5~|~05/NHS~|~"05/NHS/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Stiping and Raised Pavement Markers on 1)Lic SR 16 24.27-33.14; 2) Mus SR 16 00.00-00.33~|~05 - 4R Maintenance - Resurfacing~|~F8174BC9DB5B2EDEFE507431BBA4436805BA9FD5 116713~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~895909FB2BF54912564495F8A22F13E7BB1D416E 98339~|~1~|~1~|~01/STR~|~?01/STR/PV/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7CF2B7B3082E1B979742C0FF58B5F6E1C7725DF9 98339~|~1~|~2~|~02/S<2~|~?02/S<2/PV/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Urban routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A2939778BA11359D4C54B0B72EE816E617A385E 98339~|~1~|~3~|~03/NFA~|~?03/NFA/PV/ ? - District Preservation 4PS7 (100% State) - No CAP - Full Depth Repairs and Spot Paving on NOFAS-Rural routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7EAE950B6A3ECD76968F16F33F79B75D2BC4C663 98339~|~1~|~4~|~04/IMS~|~"04/IMS/PV/ " Plan Split for Pavement Repair work on Mus-70-10.19 to 13.22~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2B3B970208D8E45CD163767CD68B27C3BED5BA9D 98339~|~1~|~5~|~05/S>2~|~?05/S>2/PV/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Urban routes in Columbus Urban Area in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~08EAB2734199DD2B61FB1691DAC5B15D0D084F63 98339~|~1~|~6~|~06/IMS~|~"06/IMS/BR/ " - Plan Split for Bridge/App. work on Mus-70 Structures as part of spot paving work locations~|~47 - Bridge Preventive Maintenance~|~50986AA9B484405B856D3AFAFD99DBB6B7BF74E0 105445~|~1~|~1~|~01/NFP~|~Funding Split 1~|~05 - 4R Maintenance - Resurfacing~|~CA00A4B47F0052D624FEEFC918CFDC3398B2C552 96654~|~1~|~2~|~02/IMS~|~Funding split associated with work performed ont he following bridges: PRE-320-0117/6803180, PRE-70-0504R/6800939, PRE-70-0504L/6800904, PRE-70-0689L/6800998, PRE-70-0689R/6801021, PRE-70-0872/6801080, PRE-127-1911/6802702, PRE-70-1072L/6801145, PRE-70-1072R/6801234, PRE-70-1249L/6801269, PRE-70-1249R/6801293, PRE-70-1349L/6801323, PRE-70-1349R/6801358, PRE-70-1366/6801382, PRE-503-1955/6803873, PRE-70-1500L/6801471, PRE-70-1500R/6801501, PRE-70-1541/6801536, PRE-70-1665/6801595, PRE-70-1766/6801625. Split includes approach roadway work for overhead structures.~|~13 - Bridge Rehabilitation~|~DC3A8640DCC514D47D11D86E37C7EC8844B18059 96654~|~1~|~3~|~03/IMS~|~Plan Split for the work inside the rest areas~|~05 - 4R Maintenance - Resurfacing~|~37DA15C06012F992BBFE2330E65990FF05023D4B 96654~|~2~|~4~|~04/STR~|~US 35 Major 2 Full Depth Repair SLM 1.95 to 2.62~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B784D037E98B3528AEB3FE5FC8E9B4130436F626 96654~|~1~|~1~|~01/IMS~|~Plan Split for all the pavement within the project - both on mainline and ramps within the project limits. Also included resurfacing at the weigh station. Limits are on PRE-70 from SLM 0.00-17.67.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6CEBFA1FC76467A066C9E4B41719FAAC73898E00 96654~|~1~|~5~|~05/STR~|~US 35: Resurfacing SLM 1.66 to 1.95~|~05 - 4R Maintenance - Resurfacing~|~4AA28A48DE8EDDB5D891054F8E57517049280073 83988~|~1~|~2~|~02/IMS~|~Widen SFN 2513862 FRA-270-49.00, Alum Ck SB over I-270~|~13 - Bridge Rehabilitation~|~2E7B7A04EDAB6DEC39DAE8C2C40240A0378351B8 83988~|~1~|~1~|~01/IMS~|~Construct new 270/Alum Creek Ramps - pvmt work~|~04 - Reconstruction - No Added Capacity~|~5E164CCDDFBFF09B66555EE52720AC128E953A4F 83988~|~1~|~3~|~03/IMS/OBZ~|~100% Obetz funding for bridge railing aesthetics~|~13 - Bridge Rehabilitation~|~9A5CEDD44F6C6FC5329D863A8D9194CDD5D07EA9 126317~|~1~|~1~|~01/NFA~|~Created plan split for detailed design - NEVI Round 3.~|~~|~06195B91764ADFAE40760D89861236776AE1BBD6 126317~|~1~|~2~|~02/NFA~|~Created plan split for construction - NEVI Round 3.~|~~|~CB59F58460E956FBC2B3BE710280DAB49F2F834A 116897~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1273C90C48712BE17F6E85FE65FC2E615EB94487 102874~|~1~|~2~|~02/S<2~|~STP < 200000 Resurfacing: 100% City~|~05 - 4R Maintenance - Resurfacing~|~808D82F860FCC0C8A8749F9BB94978883C5F9D1B 102874~|~1~|~3~|~03/S<2~|~STP < 200000 Bridge: 80/20 Fed/State Bridge~|~13 - Bridge Rehabilitation~|~A44806D4DEDDCDA598C212D4C70FE193AB1341FF 102874~|~1~|~4~|~04/S<2~|~Asphalt Concrete Surface Course using 50% Ontario Trap Rock ($43,0000 of safety funds approved for the Ontario Trap Rock). SR113 only.~|~05 - 4R Maintenance - Resurfacing~|~B56DA83066A68BAF9B161582EAB058FCE35B051E 102874~|~1~|~6~|~06/NHS~|~NHS Resurfacing LOR-57-20.59-20.88 100% Locale~|~05 - 4R Maintenance - Resurfacing~|~030D9512D4E2E9CD4204AD11984142BF54DBE33A 102874~|~1~|~5~|~05/NHS~|~NHS Resurfacing LOR-57-20.59-20.88 80/20 Fed/Local~|~05 - 4R Maintenance - Resurfacing~|~2B2AAE3A85AC52E317BAED292E82B96D2C85D7FC 102874~|~1~|~1~|~01/S<2~|~STP < 200000 Resurfacing: LOR-113-11.66-12.74 80/20 Fed/Local.~|~05 - 4R Maintenance - Resurfacing~|~870C7557D991FD9BA091952E1F5A37D89EBBD70D 107645~|~1~|~2~|~02/S<2~|~Resurfacing SR 39 from SLM 10.26 to 10.27, from 11.24 to 11.32 and from 11.37 to 11.72. These areas are entirely within the corporation limits of the City of Dover.~|~05 - 4R Maintenance - Resurfacing~|~DD38DDCA282FC71FF26E40E86D4EB1EB5A559446 107645~|~1~|~4~|~04/S<2~|~100% City funding for non-resurfacing items in the City of New Philadelphia.~|~05 - 4R Maintenance - Resurfacing~|~7D15C7E49460BFA75268824A290775EB4A6C0CF8 107645~|~1~|~1~|~01/S<2~|~Resurfacing SR 39 from SLM 10.24 to 10.26, from SLM 10.27 to 11.24, from SLM 11.32 to 11.37, from SLM 11.74 to 12.65, from SLM 13.15 to 13.29 and from SLM 13.39 to 13.47. This is all work outside of the corporation limits of Dover and New Philadelphia.~|~05 - 4R Maintenance - Resurfacing~|~42AB8D1C4167B4E25042FEDBBDADD101ABAEDA9F 107645~|~1~|~3~|~03/S<2~|~Asphalt resurfacing of SR 39 in the City of New Philadelphia from SLM 12.65 to SLM 13.15, from SLM 13.29 to 13.39 and from SLM 13.47 to 13.55.~|~05 - 4R Maintenance - Resurfacing~|~3162B4D323E5A8B5386A71B8520EB57D236378C8 95558~|~1~|~1~|~01/IMS~|~Asphalt resurfacing of TUS-77 and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~E7990904046B90C18DD6ED4969520430384AB21E 125872~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F1E2FEFD49547D43AF18B5563E1630005D22B652 125872~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9B49F56F1394FD9F9E3960BD34A3A505C818F80C 125872~|~1~|~3~|~03/STR~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~7DD51F468F4CFFDF3D3E34486E5CC9D832D035AE 105275~|~1~|~1~|~01/STR~|~Resurfacing CAR-39~|~05 - 4R Maintenance - Resurfacing~|~BFB8F752C3170FFC91A601D6D810E219F2FD4491 125545~|~1~|~1~|~01/MPO~|~construction of a roundabout, median, sidewalk and SUP along Black street, Rhea and Gordan avenue~|~03 - Reconstruction - Added Capacity~|~A3357E07C5AE6513E685995F33A661B3A86146AA 75460~|~1~|~1~|~01/STR~|~Brdg Replacement. 0.58 miles east of CR 59 (Hamilton Rd.) 0103152 ADA SR125 18.99 Intersect: Burr Creek80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~A9F7C381FAEA29CB998594AC08A200CA1A000258 121326~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~23EFB83AC9A8A17EA535BEBF2B54D6DF0442A0B4 110606~|~1~|~1~|~01/NFP~|~Split for work on the interstate system~|~21 - Safety~|~60255B72565C670566B9574545A4DE51C2A3F77E 122408~|~1~|~1~|~01/NFP~|~Crack sealing various routes in District 12~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~818B3C71E9B099B797DEFA38806D65DEB20120BD 105288~|~1~|~1~|~01/S<2~|~Resurfacing COL-164 from Lisbon to SLM 16.87~|~05 - 4R Maintenance - Resurfacing~|~963C4935898F8943E9725ECC1C1B3B4D219CD4B2 105288~|~1~|~2~|~02/NFA~|~Resurfacing COL-164 from SLM 16.87 to SLM 18.00~|~05 - 4R Maintenance - Resurfacing~|~3E7374BDAD7B77B956C9227ACDCF6DF88D617707 120442~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~10495518060AB2E51E2DA111F03FF2F7B1C1EF17 96720~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~78AC3856FCECFE9F199FA82D013E4F7B77CC6729 91043~|~1~|~1~|~01/BRF~|~80% federal / 20% local split using CEAO LBR funds to rehab the 152-foot long steel beam bridge.~|~13 - Bridge Rehabilitation~|~E91EBC829CA523081CD76E3C0E34A1EB630E42DD 116598~|~1~|~1~|~01/STR~|~Plan split for resurfacing on CLI-28~|~05 - 4R Maintenance - Resurfacing~|~F19F0A30523C44198621E5A917C051E2E0F997FC 126610~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5D9BF30685655ACF68D89F9650A4640B062349F9 122817~|~1~|~1~|~01/MPO~|~80/20 split, 80% OKI CR funds (4CD7/KI08), 20% LNTP (using TRC)~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~8F9A0B8FCECB5ED7CD95BE0A8CA8C67D8A6E367D 101747~|~1~|~1~|~01/SAF~|~Installation of pavement solar road markers in districts 2, 11 and 12.~|~21 - Safety~|~124DEF0906DB5EF436FAAEFB691041041CFE40FC 111026~|~1~|~1~|~01/SAF~|~Repair from Landslide along Columbia Parkway.~|~21 - Safety~|~16487EAA244F912E6235EB5F5F1AFAFEB035DF36 113052~|~1~|~1~|~01/S<2~|~Reconstruction of Davids Drive from SR 134 to approximately 1.2 miles east of SR 134.~|~04 - Reconstruction - No Added Capacity~|~6BC4E93EE4CD0D91ADDF79AF294E47E3D76508E8 118788~|~1~|~1~|~01/NFA~|~Chip seal installed by operation forces~|~05 - 4R Maintenance - Resurfacing~|~B2BC4B72EAF57ED901B676819026721626D06118 99955~|~1~|~2~|~02/S<2~|~This funding split is for the traffic signal upgrade locations in Belmont County.~|~01 - New Construction~|~A6FDE1A8FC05589842FCCFB98973BE1E55598F20 99955~|~1~|~1~|~01/STR~|~This funding split is for the traffic signal upgrade location in Columbiana County.~|~01 - New Construction~|~F676C1CA2631D248BC4ACA6A3A969ABDB6EBF096 86765~|~1~|~1~|~01/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. Federal 80%/Local 20%.~|~13 - Bridge Rehabilitation~|~13F2EAEEFCE450229E05FA4FDE4FB85791D5975B 86765~|~1~|~3~|~03/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. 80% Federal/20% Local (Ohio University).~|~13 - Bridge Rehabilitation~|~4747AB17B3B875FD92E9D7151F310B4BAB869A54 86765~|~1~|~4~|~04/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. 100% Local (Ohio University).~|~13 - Bridge Rehabilitation~|~9B398DC908E24835AD0E7CA6BA966BDB13CC5D11 86765~|~1~|~2~|~02/BRO~|~Full rehabilitation of the Oxbow Bridge on Richland Avenue in City of Athens. SFN 0560111, funded under the Municipal Bridge Program. 100% Federal using Credit Bridge.~|~13 - Bridge Rehabilitation~|~F5E65898776A5F6C50BF7A34530D886C1F1CF384 120336~|~1~|~1~|~01/STR~|~added plan split.~|~04 - Reconstruction - No Added Capacity~|~AF9FB8426752F7C4E28971EEB4EF074AA7AA375A 109075~|~1~|~1~|~01/S<2~|~Landslide repair project. MEG 124 22.04. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0E3BE90430A15E9E76BEA85B968822607B04CC87 24999~|~1~|~2~|~02/IMS~|~Pavement markings and replacement of RPM's FR 1.73 MI N SIDNEY NCL TO .24 MI N JCT SR274.~|~44 - Other~|~02E4241CF5D8AB616F19361AE12BD610C6965DC6 24999~|~1~|~1~|~01/IMS~|~Minor rehab of existing pavement and other roadway related items on IR 75 from 1.73 mile North of Sidney north corporation limit to .24 miles north of junction of SR274.~|~04 - Reconstruction - No Added Capacity~|~3555DFE97C3CFA79673702880DF40EFD7B493776 24999~|~1~|~3~|~03/IMS~|~Deck patching, waterproofing Type D, deep joint sealing and Polymer modified asphalt expansion joint system on SFN 7501986 SHE 75 8.88 L & SFN 7502044 SHE 75 8.88 R; SFN 7502133 SHE 75 9.96 R and SFN 7502109 SHE 75 9.96 L; SFN 7502222 SHE 75 11.49 L and SFN 7502257 SHE 75 11.49 R; SFN 7502524 SHE 75 17.07 L and SFN 7502559 SHe 75 17.07 R, SFN 7502672 SHE 75 18.83 R and SFN 7502648 SHE 75 18.83 L~|~13 - Bridge Rehabilitation~|~425470940BE24B8D74311A3EFB289EC2D00BAE79 112896~|~1~|~1~|~01/S<2~|~MAR-4 from 13.82 to 17.21 and MAR-98 from 9.68 to 10.96~|~05 - 4R Maintenance - Resurfacing~|~7846A8C900E62411BDACAD287FD5F960C5CBFD74 112896~|~1~|~2~|~02/STR~|~MAR-98 from 0.00 to 9.68 and 10.96 to 17.17. MAR-4 from 17.21 to 18.46 and 18.85 to 20.49.~|~05 - 4R Maintenance - Resurfacing~|~1180549D0B75B289261710EEE44ABCB6378254F1 93111~|~1~|~3~|~03/S<2~|~SFN 3904326 (HUR 547 str)~|~13 - Bridge Rehabilitation~|~F03B1D63869D61CCCBD8A201AB39FACFF1455A6D 93111~|~1~|~1~|~01/STR~|~STP Rural Pavement: HUR-113-3.07-6.74 / ERI-113-0.00-6.05~|~05 - 4R Maintenance - Resurfacing~|~CBF44EB107A798E4CAE413C219131CB69F83E71C 93111~|~1~|~2~|~02/S<2~|~STP < 200000 Pavement: HUR-113-1.84-3.07 / HUR-547-7.13-8.18~|~05 - 4R Maintenance - Resurfacing~|~B9D557452ED31348DB1E190F33DDB4C9EEBBC8D7 107396~|~1~|~1~|~01/IMS~|~Block PID for FY 2024 Drainage Structures throughout District 4.~|~44 - Other~|~BADABEDBDF2F0BC5BF310E848F27E8B621755436 100205~|~1~|~1~|~01/IMS~|~Culvert repair under NOB 77 2.90. Emergency B.~|~04 - Reconstruction - No Added Capacity~|~1BF7AEB660082B60E5DA45C924CC6A6E246CD6AB 94470~|~1~|~1~|~01/STR~|~Various routes district wide.~|~21 - Safety~|~ED33E5CB04CAA2EB3B10516A132E23F03F34E95A 95446~|~1~|~1~|~01/SAF~|~Intersection improvements and signalization upgrade. MAH CR151 (South Avenue) from Matthews Road to Midlothian Boulevard.~|~21 - Safety~|~3578B07536BFCC242071BEECC168130BB17E295A 103503~|~1~|~1~|~01/NHS~|~Repair existing superstructure of bridge (COL-30-3413, SFN 1502298) by heat straightening impacted girders and replacing bottom flanges and cross-frames as needed.~|~13 - Bridge Rehabilitation~|~989324E08038AD4A31C9A3E2C83A19B2E2B7D32F 108467~|~1~|~1~|~01/MPO~|~Resurfacing of CR 17 from Norton N Corp to Minor Rd.~|~05 - 4R Maintenance - Resurfacing~|~36E43BD0BA56812DE249D822E2F66C6B5497931E 108467~|~2~|~2~|~02/MPO~|~Resurfacing of Cleveland-Massillon Rd (CR-17) from the Minor Rd to Ridgewood Rd (south intersection).~|~05 - 4R Maintenance - Resurfacing~|~4B66D9E4D03EE722F005F9FDD934863E33BD9BC1 93653~|~1~|~2~|~02/S<2~|~Work on SR 18 from the Fostoria Urban Boundary at TR 262 at SLM 6.46 to the corporation limits of the City of Fostoria at 6.82. No local funds. Work is inside the Fostoria Urban Area but outside of the City of Fostoria. State and federal funds from the District Preservation Program budget. Urban STP funds.~|~05 - 4R Maintenance - Resurfacing~|~E38127E26354052FA4616853D1F041F95F729B97 93653~|~1~|~1~|~01/STR~|~All work outside of the Fostoria Urban Area. State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~90BFF94BE022AB18FEBE48E298B2BCDCDB2DF13F 109079~|~1~|~1~|~01/CMQ~|~Construction of a multi-modal transportation facility.~|~~|~69C472C88F0ED6F6733E6439BD3CA8178B71FF79 106280~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout District 4.~|~21 - Safety~|~F16E5EDB9AAF1504882FCFD75094F60D5120DA4B 121844~|~1~|~1~|~01/MPO~|~Consruction of a portion of the Central Greenway Multi Use Path~|~28 - Facilities for Pedestrians & Bicycles~|~1D21DD6A299C2D7DB6C0885B54C3E65627A07136 104759~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in POR, STA and SUM Counties.~|~21 - Safety~|~4DA8689E410724BB20C36963401A9CD129BF8426 125036~|~1~|~1~|~01/S5K~|~All bridge replacement work included in this plan split.~|~10 - Bridge Replacement~|~ACD5A606A53D4716FF0C7BB548E553D03AE7CDF9 79221~|~1~|~2~|~02/ENH~|~New Construction. Begin @ intersection US23 and current east-west road between US23 & Second St, proceed NW intersecting w/SR104 & terminate @ SR220.Enhancement Plan Splits.CO CC PV TE = 80% TE 4B37 w/20% local match by Waverly01/ENH/PV/Waverly~|~~|~1B2A71C0EEC39ED53F6D07710012114A3513BB0E 79221~|~1~|~1~|~01/NHS~|~New Construction. Beginning at the intersection of US23 and current east-west road between US23 & Second St, proceed NW intersecting w/SR104 & terminate @ SR220. And being more fully described as follows: Construct a new segment of SR 220 roadway along the south west side of the City of Waverly within the City limits. This roadway will connect US23 south of the City, intersect with SR 104 and tie back into existing SR220 West of the City. The existing SR 220 on the west side of US 23 within the City Limits is to return to a city street. CO CC PV Smalley City = 80% Fed 4B97 Small City w/20% local match by WaverlyCO CC PV OH170 = 80% Fed 4R47 Earmark w/20% local match by WaverlyCO CC PV OH314 = 80% Fed 4R47 Earmark w/20% local match by WaverlyCO CC PV Local = 100% local match by Waverly01/NHS/PV/Waverly~|~~|~EE8C27355C6022170A020A91AFA3076719D16E76 80478~|~1~|~1~|~01/ERD/GCEO~|~"01/ERD/PV/GCEO" - SAFETEA-LU Earmark 4R47(80% Federal) / 4BG7(20% Local) - CAP of $728,000.00 federal for all phases - Access road from SR 209 into industrial park.~|~01 - New Construction~|~E52A945431B7F84CA3DCAA397B885E99242CFD81 114431~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~70F92EFEFEFB03E0768351552707A2C96BBF6400 103651~|~1~|~1~|~01/STR~|~Installation of a traffic signal at the intersection of IR 70 EB ramps and SR 149 in Belmont County~|~21 - Safety~|~22F3D7A8F87E96B510CE7E7B7E2D1F6EB417672C 124788~|~1~|~1~|~01/SAF~|~Sign replacement~|~21 - Safety~|~B051293DFC67591BE99CC63F97C88CA3B6952D33 118905~|~1~|~1~|~01/S5K~|~Resurfacing US 62 from SR 45 to SLM 11.39, and from SLM 11.64 to SR 14T~|~05 - 4R Maintenance - Resurfacing~|~25BECF36D3916158844ADD3B0FFA59E5581B3702 118905~|~1~|~2~|~02/S5K~|~Resurfacing US 62 within the City of Salem, SLM 11.39 to SLM 11.64~|~05 - 4R Maintenance - Resurfacing~|~5A422CFB5F5CF073FE1CC36763340A709D06E2AD 118905~|~1~|~3~|~03/STR~|~Resurfacing SR 165~|~05 - 4R Maintenance - Resurfacing~|~CB50832CAB7A33166A36087D62BFB725E83588E9 102885~|~1~|~1~|~01/IMS~|~Plan Split for the roadway portion of the project~|~05 - 4R Maintenance - Resurfacing~|~46485D83583DB1FDC8B9DDC7CF65E587F1C60668 97464~|~1~|~1~|~01/S>2~|~100% ORDC funding for queue cutter EB at CSX RR in Powell~|~22 - Rail/Highway crossing~|~11A87377910B05E8F22C5A8C2B3BC21D3E8E7895 91038~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~8D0301819C7F36872A689D059CFB782110F54A50 95427~|~1~|~1~|~01/NFA~|~Facilities Funds (LBP7)~|~17 - Construction Engineering~|~14C35038F4054BD7F22AD005993CE03EA794A3FC 91998~|~1~|~2~|~02/NFA~|~ADA 781 (2.08-2.12)~|~05 - 4R Maintenance - Resurfacing~|~EB69E7D181FB0982CC24E86804627EAC298849F0 91998~|~1~|~1~|~01/STR~|~ADA 247 (17.12-18.17)ADA 781 (2.12-10.99)~|~05 - 4R Maintenance - Resurfacing~|~20EBD385B0A9F6A948B09670BD80ACFABCE72CFD 91998~|~1~|~3~|~03/STR~|~ADA 781 2.17 0104604ADA 781 8.09 0104663~|~47 - Bridge Preventive Maintenance~|~2AF8793AC1E3D508056404534434185CEB1B2C15 91998~|~1~|~4~|~04/STR~|~ADA 781 9.79 0104752 Under 20Ft.~|~04 - Reconstruction - No Added Capacity~|~6F1982818ADEE2C2C00806255A48B076056D7A3B 126414~|~1~|~1~|~01/ERD/CANT~|~Streetscape.~|~16 - Right of Way~|~B2FF79A62C7F6698738E0EE2AC1D47F78B3EAAEB 87095~|~1~|~2~|~02/NFA~|~Resurfacing on the 100% State portion of GRE-370 within the project limits. The section is between SLM 0.0 to 1.21~|~05 - 4R Maintenance - Resurfacing~|~01A01CBB681C5027E86709A3C10DF10D4044BA31 87095~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of GRE-343 within the project limits. The section is between SLM 0.00 to 3.30~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0BA638AEC56637D094D3583154462B423EB2C893 87095~|~1~|~3~|~03/STR~|~Railing repair on rural bridge.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0179D2E411368BC5DDE4199C675C4034DF802BC9 92219~|~1~|~1~|~01/SAE~|~install pavement markings on various county roads in Fulton County~|~21 - Safety~|~F1B85E20C473CEF867902B04FD9950A7619E3CCC 89717~|~1~|~1~|~01/SAE~|~A SRTS funded project to construct sidewalks at LUC CR71 5.35-5.36 LUC CR555 1.02-4.55, LUC CR556 0-1.92~|~21 - Safety~|~0718C6B77216230C8EE1D5E6BFAD74B035A349EE 111262~|~1~|~1~|~01/NHS~|~Type "A" terminal assembly replacements.~|~21 - Safety~|~E71C16F070097FB1C35E4383E7F5DC2BA0280263 125865~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MRG 83 10.328-15.60~|~05 - 4R Maintenance - Resurfacing~|~9C290A3FCB6F564832F31438EA7FE25D6566B05C 95772~|~1~|~1~|~01/STR~|~Resurfacing plan split for SEN-19, SEN-228 & SEN-590~|~05 - 4R Maintenance - Resurfacing~|~7724E3B4B9105A7F920EDCA2299FE5BC5E142B89 123753~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~FEA44DC5B3A8DB1D94B503FD15875E44DE49B8B2 98987~|~1~|~1~|~01/NFA~|~ODNR JAC Cooper Hollow Wildlife Area~|~05 - 4R Maintenance - Resurfacing~|~DFAAEE69650273A182FABB0DB115EA472011D263 107691~|~1~|~1~|~01/NHS~|~Plan split for all work associated with the SEN-23-0742 bridge replacement~|~04 - Reconstruction - No Added Capacity~|~4B237B95591DD049C767A7717A706E302AB132CA 117367~|~1~|~1~|~01/NHS~|~Crack and seat work. ~|~04 - Reconstruction - No Added Capacity~|~596B519F237468CC821BE3EB8B29C0E4FAC254C0 117367~|~2~|~2~|~02/STR~|~Slide repair work on US 127. Funded by the Geologic Site Management Program with overage funded by the District.~|~66 - Resilience Improvement - Highway Project ~|~DD42EA5321BB912486664729248CFED71D14A3B9 117367~|~2~|~3~|~03/NHS~|~Slide repair work on US 24. Funds by the Geologic Site Management Program with overage funded by the District. ~|~66 - Resilience Improvement - Highway Project ~|~D5E5076D2F2F747FD5C7E7C4E50B5FAA9F48FC46 105093~|~1~|~1~|~01/STR~|~01/STR/PV/ -Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~42A406A395C824F07F3ED576C591128844314E5E 107548~|~1~|~1~|~01/STR~|~Resurfacing TUS-212~|~05 - 4R Maintenance - Resurfacing~|~86620E3D8ADB0CF30CA5BB5121EF88C1C31B57A9 97287~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2019~|~21 - Safety~|~42C7EE24EAD6FE52CD48A0A0BC235FF32C7A467D 91041~|~1~|~1~|~01/MPO~|~Minor rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5DB5B2B69F1AED06C8F5597F4D94581D9044EA08 101556~|~1~|~1~|~01/NHS~|~SFN 4800303 - Rehab cost split~|~13 - Bridge Rehabilitation~|~576DF26CE38DD123F9F3AE74F297C9DB227A6CF3 101556~|~1~|~2~|~02/NHS~|~SFN 4800303 - Maintenance cost split~|~13 - Bridge Rehabilitation~|~3AB6A5DBFB254FA0A06FAEB977FD2FE4F476A4BB 101556~|~1~|~4~|~04/NHS~|~CE Ongoing split~|~17 - Construction Engineering~|~E57932AF05A7B38BE9153EE51B1AB36E930D35C5 101556~|~1~|~3~|~03/NHS~|~Bridge lighting Plan Split~|~13 - Bridge Rehabilitation~|~C3781DB2B495ED873E63BDEE9002BB8D8FF7BA32 106206~|~1~|~1~|~01/IMS~|~FY 2020 Block PID for drainage system maintenance/repair.~|~~|~67870C7754E5125A0047D03138BD12B478658CDD 107824~|~1~|~1~|~01/S<2~|~Part 1 - PIC-752-0.00 to 1.74 and PIC-752-1.92 to 2.32~|~05 - 4R Maintenance - Resurfacing~|~6DDB9C9CCE8556BB31F9E266A34AE8B3E4A66812 107824~|~1~|~2~|~02/STR~|~Part 1 - PIC-752-2.32 to 8.43~|~05 - 4R Maintenance - Resurfacing~|~BB9DBF60F9101C62B3632C5ECD0B51FBBFCB8B3E 107824~|~2~|~4~|~04/S<2~|~Part 2 -PIC-316-13.05 to 13.68 - State Funded Paving Work~|~05 - 4R Maintenance - Resurfacing~|~1F79D3E91B7188CEF997F835A5F113CC2085859B 107824~|~2~|~5~|~05/S<2~|~Items to be paid 100% by the Village of Ashville including OPWC funds~|~05 - 4R Maintenance - Resurfacing~|~FED8FB3F0D8DE91710EF241C409E2D5952470EA1 107824~|~1~|~3~|~03/STR~|~Bridge on PIC-752, SFN: 6503675 and 6503683~|~47 - Bridge Preventive Maintenance~|~515DAE63251B6157F735DD68E764B99459801E3E 100954~|~1~|~2~|~02/STR~|~Replace existing polymer modified joint.~|~47 - Bridge Preventive Maintenance~|~551D0D48492FB377C7278240D7811C048AE6670B 100954~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 5 from 26.00 to 30.95, TRU SR 87 from 0.00 to 2.26 and TRU SR 88 from 2.99 to 7.03.~|~05 - 4R Maintenance - Resurfacing~|~17228D7510D956A37207BE784925A673A4EC34D2 87081~|~1~|~1~|~01/BRF~|~LOG CR 21 1.00 (SFN 4631838) Bridge replacementBuild new 2-lane structure adjacent to the historic truss. New structure will be on 55 mph curve alignment north of existing. Approximately 900' of roadway work will be required. Existing truss will remain in place as is. This structure is over the Great Miami River and there will be no work in the river. The historice truss will not be impacted by this project.~|~~|~05759D17105EA67BABC239356FF901F8D7C3251F 109958~|~1~|~1~|~01/SAF~|~CLI CR 12 4.43-4.93 realign both the horizontal and vertical curve as well as widen pavement and berms.~|~21 - Safety~|~66AEF84CA826FFB727038B5AB29ABBF3D3AE9177 123551~|~1~|~1~|~01/NFP~|~CS 2031~|~99 - State Preventative Maintenance~|~AC9CCCE1393353D12C0A1A44786F23634BFABEA3 107247~|~1~|~1~|~01/S>2~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~0334018FDD42A0BCBA33141F5DF2FCDEA2C6D2B3 96861~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail on various County Roads within Medina County.~|~21 - Safety~|~B6D19F48415114FD1F267D4E58785B10A7BAF2F5 96110~|~1~|~1~|~01/NFP~|~Wash Bay~|~44 - Other~|~F5A64AC100CF1D04B351D840B5E25254E313C1F0 107810~|~1~|~1~|~01/S<2~|~All work in the project. Work funded with funds from the Geologic Site Management (GSM) program. After the cap is reached funds will come from the District Preservation Program budget. No local funds.~|~04 - Reconstruction - No Added Capacity~|~F393E56134406E35B0E568E15C68FFC08792840F 107143~|~1~|~1~|~01/NHS~|~Slide/erosion repair along State Route 5 Westbound, Trumbull County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5F53C4B00467A1BCB50C5878DC6BB1A8AC97AD01 116674~|~1~|~1~|~01/SAF~|~TSG~|~21 - Safety~|~D4EBB5EEF74DC1CA7A0A0178FA3145F9246162C0 89269~|~1~|~1~|~01/ENH~|~A multi-use path in a park in the Village of Whithouse.~|~28 - Facilities for Pedestrians & Bicycles~|~C4B2A9C2D4B5665E731A5876A4E84FA691B84376 82073~|~1~|~3~|~03/S>2~|~100% Local Columbus funding for pavement repairs and possibly new 5' paved shoulder, and curb ramps~|~05 - 4R Maintenance - Resurfacing~|~3C59EAFC3203D27857634639B524494F2D5B76A9 82073~|~1~|~1~|~01/S>2~|~Federal/Local funding for urban paving portion of project in ColumbusSLM 15.42-19.87, 23.04-24.31~|~05 - 4R Maintenance - Resurfacing~|~83ABA1F2901F799BE1DC1E0550B60A27928B248C 82073~|~1~|~2~|~02/S>2~|~Federal/State funding for areas outstide of ColumbusSLM 24.31-24.48~|~05 - 4R Maintenance - Resurfacing~|~9530F1DBE3C1E6FB5B7D19F9639960CF00C75EE5 113710~|~1~|~1~|~01/MPO~|~Split for TLCI sidewalk work.~|~28 - Facilities for Pedestrians & Bicycles~|~6B0A542A1C69FF170E540D8A814B81D65B48F8D6 109527~|~1~|~1~|~01/SAF~|~purchase two LED countdown signs~|~~|~15131EC02E0AC91DDBC192E179B6398F5F878F7C 95831~|~1~|~1~|~01/IMS~|~Reconstruction of the SUM - Central Interchange in the City of Akron, Summit County, Ohio.~|~~|~2A3CEBF45AF3DA4E965BF22546A9CB2104D3DB99 116436~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~FE461A177F1E4539CAF7DB20DEBEE442BF71DF02 96295~|~1~|~1~|~01/SAF~|~Various intersection improvements on SR 2 in Lucas county from I-280/Dearborn to Isaac Drive~|~21 - Safety~|~2330F872E6737FF62A5F42733D14B65E9CAEDB9F 96295~|~1~|~2~|~02/SAF~|~plan split for 100% City items~|~21 - Safety~|~1C43B924A818BF8FD2ABAB6947F2730EB3AA387B 114354~|~1~|~2~|~02/STR~|~Resurfacing various county roads.~|~05 - 4R Maintenance - Resurfacing~|~AF3A5EF5CE2B55D25F7A01FEEBE22BE24CB95CA7 114354~|~1~|~1~|~01/S5K~|~Resurfacing on various county roads.~|~05 - 4R Maintenance - Resurfacing~|~BBA36746F6C3BEFDB8CB10C0B6A0C311B618D81B 125943~|~1~|~1~|~01/SAF~|~EB left turn lane extension and WB right turn lane extension on SR-63 only~|~21 - Safety~|~3D0E7F574D9AEA973BC7ABFF6513CF38803DA473 86159~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 669 1585, SFN 5802253. Rural other federal funded 80 federal/20 state.~|~10 - Bridge Replacement~|~0888AA63D3170A76388E9B156BB27CFE439D9D07 107554~|~1~|~1~|~01/STR~|~Herbicidal Spraying~|~44 - Other~|~693ACF331D4B08FE4065269B818CECFE8FE0AA36 105229~|~1~|~1~|~01/STR~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~98BB33BF16E36F561F3C445992531DA38C797867 105229~|~1~|~2~|~02/S<2~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~B4BCCA9CB26D639F20B0BAD9394D1FED969E2A11 105229~|~1~|~3~|~03/NFA~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~82B681C8E7181886373DCC36DE4673C22BC453CE 121193~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the center line, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the Western MQS quadrants of the District.~|~21 - Safety~|~30D095A5CF0FFF7EAACBCFA6790D01DC0CAC62ED 122188~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-F~|~~|~B9181B5AB5494E2F6753450909A6DCCACE019368 85253~|~2~|~2~|~02/BRO~|~6200036 OTT SR2 0.16 Intersect: Crane Creek~|~10 - Bridge Replacement~|~7732A88C42A534482527B5760E92553ABBD70DAC 85253~|~1~|~1~|~01/NHS~|~Resurfacing LUC SR2 34.05-34.2 and OTT SR2 0-10.78~|~05 - 4R Maintenance - Resurfacing~|~8D76139E21BE6F93E1BD3CDE7FACECB94FB28D43 121659~|~1~|~1~|~01/IMS~|~replace deck~|~13 - Bridge Rehabilitation~|~70F64DD53CDCA889DDF220C780EACF80132F3F91 126118~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~21 - Safety~|~6FAB177B37F00083BE1A23713F2CE575BC500001 126010~|~1~|~1~|~01/MPO~|~NOACA STBG Plan Split~|~04 - Reconstruction - No Added Capacity~|~FC9D96596717E8F625FE29329292E36E389DFB67 126010~|~1~|~2~|~02/MPO~|~Plan split for Bicycle/Pedestrian Improvements- TA/CMAQ~|~28 - Facilities for Pedestrians & Bicycles~|~A3FCEE3ED60057787786CA57E33467BE2872FD8C 126010~|~1~|~3~|~03/SAF~|~Plan Split is for Signals ~|~21 - Safety~|~80B802769850C6DF373953969D4A4B3DDDEBF832 126010~|~1~|~4~|~04/NFP~|~Plan split for non-federal eligible work items at 100% local cost.~|~44 - Other~|~F154B895BE18051E64814CFC2EB64EB9E14AB09A 95165~|~1~|~1~|~01/STR~|~2015 ER Event OH15-01DSR# BEL-030Slide repair via drilled shaft retaining wall.~|~04 - Reconstruction - No Added Capacity~|~CC5F3E5233BE57CCA7C24896AFAD70A3BAC5DA23 106437~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster SRTS Funds - 4SC7 (80% Federal) / 4BG7 (20% Local TRC) - See CAP Comments - Construction of sidewalks on east side of Sheridan Drive, beginning at East Fair Avenue and ending at Medill Elementary School - - Additive Alternate adds "Construction of sidewalks on east side of Sheridan Drive, beginning at Frederick Street to East Fair Avenue ."~|~28 - Facilities for Pedestrians & Bicycles~|~64C0703577A272CACA52342953F1AAEEE97332FB 101103~|~1~|~1~|~01/NHS~|~TBD~|~05 - 4R Maintenance - Resurfacing~|~59F7FFA02616CB58D318B5D29EF9C18068EFEDA7 96701~|~1~|~1~|~01/NFA~|~STA Wilmot Shared 1,000 ton Salt Storage Building, demo existing timber shed.~|~~|~EE76E1389081CE32DA11F708150205041311CC43 126021~|~1~|~1~|~01/IMS~|~Funding Event MYWP FY28~|~05 - 4R Maintenance - Resurfacing~|~F21E11053B06D897B9816DD99545CAF34BEFB716 110558~|~1~|~1~|~01/STR~|~LAW-243-10.81 Bridge Replacement.~|~10 - Bridge Replacement~|~48833F304475F2945D8C271475F2D27712093020 119929~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT~|~21 - Safety~|~62ECC9E3C72D9B3BBBF65DE0651617A97A794011 111248~|~1~|~1~|~01/NFP~|~01/NFP/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~E47842F56AFA8C1B3F726727B264FD654AB3ECC3 86155~|~1~|~1~|~01/S<2~|~Culvert replacement project. MOE 536 0.96, SFN 5602858. Urban other federal aid 80/20 federal/state.~|~10 - Bridge Replacement~|~6AEF8441BFEAA8029EA7BEBB416A8A82FC360C6E 100890~|~1~|~1~|~01/NHS~|~SCI 52 10.50 (SFN 7300719)~|~10 - Bridge Replacement~|~43BD541E7EE814F6A52BF2D088D52C0785828A7A 88937~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~B54183310B92A3C2070C2FC9E00B644633A6C69A 88937~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~CB2DA56BA2EA2C0F55E315D2EFDDB9A483676251 88937~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~862B37DB336681AACE48214AD7F05682346B165D 88780~|~1~|~1~|~01/STR~|~Project includes widening the northbound lane of Wayne Madison Road for approximately 0.5 miles. Widening will consist of a 12 foot lane, curb and gutter, an enclosed drainage system, and multi-use path on the widened side of the roadway.~|~04 - Reconstruction - No Added Capacity~|~DE980FEBF60BBE6528580A1516022BCD633460C5 124585~|~1~|~1~|~01/S5K~|~Roadway widening to improve horizontal and vertical alignment using 80% CEAO CSTP 4B77 funds up to federal maximum.~|~04 - Reconstruction - No Added Capacity~|~91146487FED787273A839BC8536F863A73DDB5C6 98269~|~1~|~1~|~01/CMQ~|~(CR 230) Installation of 6,550' fo bike path that would connect Wolfe Creek Trail near the intersection of Wolfe Creek Pike and NW Connector (SR 49) and the intersection of Olive Road and Modern Way in the City of Trotwood. The proposed path will utilize 2,415' of existing roadway shoulder along with 4,135' of new path. Also included is paving of the existing upaved bikeway from Olive Road, west to Vickwood Lane.~|~28 - Facilities for Pedestrians & Bicycles~|~650A502F47137443A1D1A5447C17D208155EEC6A 112585~|~1~|~1~|~01/ENH~|~Construct East Park hike and bike trail in Mill Creek Park.~|~28 - Facilities for Pedestrians & Bicycles~|~CBFD4FF22A92B9F89D1535F293BC0E79BC0D3AFB 117053~|~1~|~1~|~01/S>2~|~Split for bridge work~|~10 - Bridge Replacement~|~5AF382E07246D682EC4BC925A7524948B0954E3A 86958~|~1~|~1~|~01/STR~|~7403607 SEN SR587 3.69 Intersect: East Br Wolf Creek Branch~|~04 - Reconstruction - No Added Capacity~|~C66BE2C661157CF7D255365EA1BF032150011CC7 114505~|~1~|~1~|~01/STR~|~plan split for the rural work locations~|~05 - 4R Maintenance - Resurfacing~|~09ADF97D3B37560EDC4DC100C7E7BCEEFAD9279C 119279~|~1~|~1~|~01/S>2~|~Major Collector~|~05 - 4R Maintenance - Resurfacing~|~66D3803A24CB8129359E16F70333D4E44E57046A 119279~|~1~|~2~|~02/S>2~|~Minor Arterial~|~05 - 4R Maintenance - Resurfacing~|~50AF65233436C01AB0BC201238B73D1C8960F4F4 25491~|~1~|~1~|~01/NHS~|~HEN-24 from SLM 10.91 to SLM 19.47~|~05 - 4R Maintenance - Resurfacing~|~D81DEFF19F719178C2EA3256CD77DB30534357FE 116649~|~1~|~1~|~01/IMS~|~This plan split is for DD, pre-award~|~17 - Construction Engineering~|~5C5C5467FCFD69236F83BC66293F90BAF1541383 116649~|~1~|~2~|~02/IMS~|~Plan split represents all work related to roadway construction and engineering work in Ohio.~|~03 - Reconstruction - Added Capacity~|~32DEEEEEB7CCE9323449CC82CC7BDDC446EA4618 116649~|~1~|~3~|~03/IMS~|~Plan split represents all work related to bridge reconstruction construction and engineering work in Ohio.~|~10 - Bridge Replacement~|~4B2B041842AD20DFB00F83EE8AF454BF362357F6 116649~|~1~|~4~|~04/IMS~|~Plan split represents all work related to new bridge construction construction and engineering work in Ohio.~|~08 - Bridge - New Construction~|~1F4C2F39F0DA262F06C1B3D30CEA70A0922DACCA 116649~|~1~|~5~|~05/IMS~|~Plan split represents all work related to roadway construction and engineering work in KY.~|~03 - Reconstruction - Added Capacity~|~5CA86E175E89C1D39E8C236F04F37EF4E6D6A167 116649~|~1~|~6~|~06/IMS~|~Plan split represents all work related to bridge reconstruction construction and engineering work in KY.~|~10 - Bridge Replacement~|~31C220B3B78C6DA55F6CF43A1E9EA452239CFB2D 116649~|~1~|~7~|~07/IMS~|~Plan split represents all work related to new bridge construction and engineering work in KY.~|~08 - Bridge - New Construction~|~0A3839A3A685D31F73553008ADFFCC007588042D 116649~|~1~|~8~|~08/IMS~|~Plan split represents all work related to bridge construction and engineering work for the new companion structure. This work is split 50/50 between OH and KY~|~08 - Bridge - New Construction~|~1E72D6F2ECB0DE9AC5EC5A9D1E79AAE17E427EA4 116649~|~1~|~9~|~09/IMS~|~Plan split represents all work related to bridge rehab work construction and engineering work for the existing Brent Spence Bridge structure. This work is split 50/50 between OH and KY.~|~15 - Preliminary Engineering~|~B120E992E30B2FD94072F43833D1CFE269FC0DF2 116649~|~1~|~10~|~10/IMS~|~This plan split represents six early work packages that can be funded through the RW Phase in Ohio consisting of 1) the Alta Fiber Utility Trench, 2) the demo and restoration of Longworth Hall, 3) the demo of the WXIX parking garage, 4) the demolition of ARTIMIS, 5) Longworth Hall tuckpointing and windows, and 6) relocation of the 36: GCWW Gest Street Water Main~|~16 - Right of Way~|~E582C0631CFC6ECFE9A7A1457A13AAE3F62A1A1E 116649~|~1~|~11~|~11/IMS~|~This plan split represents all of the early work packages in KY that can be funded through the RW phase, including: 1) SD-1 Existing Willow Run Combined Sewer Lining, 2) EWP-KY-61 Third St 36 inch Sanitary, 3) EWP-KY-60 Third and Crescent Waterline, 4) EWP-KY-18 KY Joint Utility Trench, and 5) Duke Energy grading work~|~43 - Utilities~|~F9ACAC1AB877E512D8F3EAE7D35F7A0D24850009 106298~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4.~|~21 - Safety~|~B3468B47C58B642E315CA4F66D5F4F0DF8DE020C 88800~|~1~|~1~|~01/BRO~|~Replace deteriorated bridge with minimal approach work SFN 0603244 AUG SR 219 7.12 bridge over Schmier Ditch.~|~04 - Reconstruction - No Added Capacity~|~825D1B63E8324659432A924E062C7638335D1EC4 119209~|~1~|~1~|~01/STR~|~Reactive Pavement Maintenance.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3EFE6C76C74A1CF983AC0A2AEF3142D8E9378298 124527~|~1~|~1~|~01/IMS~|~Replace structure~|~10 - Bridge Replacement~|~753049764FBB25646595BE9DA93F56EDCB969666 77333~|~1~|~1~|~01/NFA~|~Preliminary split to be used until funding is available. Currently this project uses the TRAC SAC.~|~~|~C71C80D6D551101A3DD37F77DB9A1AAA26F16B25 121406~|~1~|~1~|~01/IMS~|~Plan Split to repair longitudinal joints on BUT+WAR-75~|~05 - 4R Maintenance - Resurfacing~|~A0A708A0E3D8967C3D823F5122AC86AAA6CDF7D2 118770~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E070EEDBC002436AF1DCEEC8F0BCE5D39416EA9F 118770~|~1~|~2~|~02/S>2~|~Bridge Maintenance~|~47 - Bridge Preventive Maintenance~|~892E06B4317A0BE443AB3E5628B3B95F5BDDD84E 118770~|~1~|~3~|~03/NHS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~3F482E867A412B069FB7DBA5C68D6188FD6DBD58 118770~|~1~|~4~|~04/IMS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~8014117A27158716EEB0A6A64FAA9A17F21A0381 123095~|~1~|~1~|~01/STR~|~Pavement marking project on various routes and sections in Athens County in FY25. CEAO funded.~|~21 - Safety~|~C15163384CECDCB36B3980D289A1813CADBC3BC3 99714~|~1~|~2~|~02/IMS~|~Heat straightening of damaged beams FRA-40-6.27 (2512270)~|~13 - Bridge Rehabilitation~|~189C9A78DDADFAFE60BDD848EB591D0E276AA939 99714~|~1~|~1~|~01/NHS~|~For repair of damaged structure UNI-4-13.20 (8000093)~|~13 - Bridge Rehabilitation~|~DB6F83E81366D9FC54FE38799E58F8C1031F3754 109306~|~1~|~1~|~01/SAF~|~Safety Improvements on CR 70 (Philothea Road) SLM 0.00 to 2.00~|~21 - Safety~|~93745CAB7B833E75790CC7C8224FE3CC9ED516B9 102598~|~1~|~1~|~01/IMS~|~Replace superstructures on TUS-77-2018 L & R (SFN 7902794, 7902824) and TUS-77-2089 L & R (SFN 7902883, 7902913).~|~10 - Bridge Replacement~|~D264A180AF6546BCF014CC98A0A1473029A08B5B 125471~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~~|~44E3F550FF8697FBD04EB60AEF33D04E3861F387 102447~|~1~|~1~|~01/STR~|~Herbicidal Spraying for CAR, COL, HOL, and TUS~|~44 - Other~|~82DFFE71F971E2D90AF4D92C52866090E27AA279 118536~|~1~|~1~|~01/STR~|~Bridge superstructure replacements.~|~13 - Bridge Rehabilitation~|~B782F73B7AAC06553E8056E5767B1C382CEFD6DE 107876~|~1~|~1~|~01/STR~|~On SR 12 in Hancock County from SLM 4.92 which is just east of west corporation limits of the Village of Benton Ridge to the Findlay Urban Area limits at CR 139 which is at SLM 10.19. District preservation funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~706A078B3B2CA416E73F77F99ADFEBE396590646 107876~|~1~|~2~|~02/S<2~|~On SR 12 in Hancock County from the Findlay Urban Area limits at CR 139 at SLM 10.19 to SLM 11.96 which is 0.13 mile east of Montana Avenue. District preservation program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~7BB660B152DBD73976CB52EB29128C2CAF676C1E 107876~|~1~|~3~|~03/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds.~|~21 - Safety~|~573DFA820312E9693B14DDD8BF19E6F7B96C621A 107876~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~14E89501F764D5C303A488D35C3C58A2E7F20F26 88528~|~1~|~2~|~02/S>2/SCE~|~Resurfacing of Arlington Road from Killian Road to Krumroy, in Springfield Township, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~94FEBCC4701ECC0871DEA6419174AD176426595D 88528~|~1~|~1~|~01/CMQ/SCE~|~Signals, NB turn lane at Warner Road, on Arlington Road from Killian Road to Krumroy Road in Springfield Township, Summit County, Ohio.~|~21 - Safety~|~6875566D4B8F935402B9D04F65CA67A04470895F 107550~|~1~|~1~|~01/STR~|~Resurfacing SR 416 from US 36 to SLM 3.78~|~05 - 4R Maintenance - Resurfacing~|~25386AD8B8DC3D9DB6E18B0266B2EA61411CCFFE 81637~|~1~|~2~|~02/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~5C0D62EED3069B2C859E5F610F878026FEA6AD53 81637~|~1~|~1~|~01/IMS~|~Resurfacing MAH IR 76 from 0.00 to 3.08.~|~05 - 4R Maintenance - Resurfacing~|~00057FCA785D6DF4BD2EBACA46CD7DF6C82F699C 97042~|~1~|~3~|~03/STR~|~Pavement AC Overlay w/Rpr RIC SR 39 1.120 TO 1.580 RIC SR 96 0.000 TO 1.143~|~05 - 4R Maintenance - Resurfacing~|~3A4855A03109582BDB0EEE336775F5C592EEDC17 97042~|~1~|~1~|~01/NFA~|~Pavement AC Overlay w/Rpr: CRA SR 39 4.026 TO 7.613 RIC SR 39 0.000 TO 1.120~|~05 - 4R Maintenance - Resurfacing~|~54D3943D7D639422BF454AEEFF8234DD71D4707B 97042~|~1~|~2~|~02/S5K~|~Pavement AC Overlay w/Rpr RIC SR 39 1.580 TO 1.851~|~05 - 4R Maintenance - Resurfacing~|~9524CEDCE78B969B25739E1AF9A49644B8035AAB 82953~|~2~|~1~|~01/S<2~|~100 % Local Funds (City of Lorain) Waterline~|~05 - 4R Maintenance - Resurfacing~|~A18E90D6CFB42CADF065E6B61290ADD7F5603806 82953~|~1~|~2~|~02/S<2~|~Part 1 funded 80/20 NOACA / City of Lorain. Pavement/curbs/sidewalks from West 30th Street to West Erie Ave (US 6).~|~05 - 4R Maintenance - Resurfacing~|~E258A27B17D65EA05BF8BDE0C026651D8274EC76 113252~|~1~|~1~|~01/STR~|~Replacement of MED SR 0301 05.48 culvert.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~662C6FDE7D19C6D26750EC04B524E7108FE22396 79671~|~1~|~1~|~01/IMS~|~Split for the entire project~|~03 - Reconstruction - Added Capacity~|~5A37352C811749CC5580A6E04B32B1D85209B5C6 94484~|~1~|~1~|~01/CMQ~|~Installation of fiber optic cable and interconnection of 130 signallized intersections in Cincinnati~|~21 - Safety~|~ECAF32F27D1F28E33A7780C1D6F09FA59B4E1144 101444~|~1~|~1~|~01/NHS~|~NHS Urban Paving - 80/20 Fed/City~|~05 - 4R Maintenance - Resurfacing~|~EC00D436821F6A0DC5A25A8C668AB4B722849323 101444~|~1~|~2~|~02/NHS~|~100% City of Huron Items~|~05 - 4R Maintenance - Resurfacing~|~9ABF639C31A83BF607258D71565B4B8346FE9D9B 101444~|~1~|~3~|~03/STR~|~BRIDGE WORK TO DETERMINED LATER.~|~13 - Bridge Rehabilitation~|~D555753C61ECD4DD9E213A9FF7DACAEB4160C982 104352~|~1~|~1~|~01/STR~|~Split for paving work on the rural STP system from SLM 00.00 to 4.875~|~05 - 4R Maintenance - Resurfacing~|~A6EB3CF424C9F540801D7D0FFD9539B38BFFFFCE 102939~|~1~|~1~|~01/STR~|~Major Rehab: CRA-602 Pavement~|~04 - Reconstruction - No Added Capacity~|~CDB912D5695C02C6A0698A11FC3B68C0E286C397 102939~|~1~|~2~|~02/STR~|~Bridges:CRA-SR-602 05.980 SFN 1703846 (OVER SANDUSKY RIVER)Minor Rehabilitation ? Slope repair & prot (082) Restore Rear Abutment Slope with RCP Type C  CRA-SR-602 09.490 SFN 1703870 (OVER BROKENSWORD CREEK) Preventive Maintenance ? Deck overlay(concrete) (040) Reactive Maintenance ? Exp jt repair/repl (048) Minor Rehabilitation ? Conc patching (non-deck) (010) ? Deck patching (conc) (049) ? Bridge railing upgrade/repair (061) ? Pile encasement (084) Replace deck edges, overlay deck, new bridge railing, patching approach slabs, pier pile encasement ~|~13 - Bridge Rehabilitation~|~EA5EA1D25D34FBEE4E820F551B8E4C9303E9DA8A 126292~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~05C03032897E318908D62E3AFCF7F834E9C76656 119137~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~3983C1C11C6912FBD8CA73DE69AA114A1E9AEFB2 92400~|~1~|~1~|~01/NFP~|~Facilities Split~|~44 - Other~|~86FE4EC236BB851541B095CF810ACE6AB1C58CFD 91246~|~1~|~1~|~01/NHS~|~repair slide at Woo-795 7.33~|~44 - Other~|~B51F15FDE038B6FF4A520E4E41DE68B3EEEEE61F 113790~|~1~|~1~|~01/NHS~|~Repair structure TUS-250-1232 R (SFN 7904835) by replacing the strip seal expansion joints throughout the bridge length.~|~13 - Bridge Rehabilitation~|~A8458CE84447F39F478600C1824C9079CA605018 105362~|~1~|~1~|~01/STR~|~AC overlay without repairs on:AUG-219 SLM 14.12 to 15.26~|~05 - 4R Maintenance - Resurfacing~|~70F86FE72CE4127B6EE5B0013139FF9B429435F3 113753~|~1~|~1~|~01/SAF~|~Replace an Existing Span Wire Traffic Signal with a new Mast Arm Traffic Signal, add back plates, and radar detection.~|~21 - Safety~|~C26B922B7B149AB6DD16FC77B5814AC204E4AAE6 113753~|~1~|~2~|~02/SAF~|~Items to be paid by the City.~|~~|~B6BD10C937EE23FF5452E84251053E5C7444C8A0 83667~|~1~|~2~|~02/BRO~|~PIK SR104 10.64 - 11.36 Lake WhiteOn SR104 begin project at it junction w/SR551 and terminate at 0.84 mile south of Waverly Corp. limit (intersection of SR552). Project Description: On SR104, it is proposed to perform major rehab of the highway by reconstructing the highway surface in conjunction with the ODNR improvements to the Lake White Dam upgrades. Also the project includes replacing the existing bridge over Pee Pee Creek (also over Lake White Spillway) and improve the durability of the Lake White Dam by armoring the downstream face (Roller Compacted Concrete) to help protect the dam from impacts of flooding. This project is a ODOT/ODNR partnership for design, construction and construction inspection. 6601057 PIK SR104 11.23 Intersect: Pee Pee CreekCO CC 02 plan split for brdg eligible for BR funds. 100% state01/BRO/BR/State~|~10 - Bridge Replacement~|~3F4594A5CAB55D0E18A1D77C683F209449EAFFA8 83667~|~1~|~3~|~03/S<2~|~PIK SR104 10.64 - 11.36 Lake WhiteOn SR104 begin project at it junction w/SR551 and terminate at 0.84 mile south of Waverly Corp. limit (intersection of SR552). Project Description: On SR104, it is proposed to perform major rehab of the highway by reconstructing the highway surface in conjunction with the ODNR improvements to the Lake White Dam upgrades. Also the project includes replacing the existing bridge over Pee Pee Creek (also over Lake White Spillway) and improve the durability of the Lake White Dam by armoring the downstream face (Roller Compacted Concrete) to help protect the dam from impacts of flooding. This project is a ODOT/ODNR partnership for design, construction and construction inspection. CO CC 03 plan split for ODNRLocal match by ODNR.01/S<2/OT/ODNR~|~44 - Other~|~D71815A7A42B7F2324293E4E2FB8D7D3976F1C60 83667~|~1~|~1~|~01/S<2~|~PIK SR104 10.64 - 11.36 Lake WhiteOn SR104 begin project at it junction w/SR551 and terminate at 0.84 mile south of Waverly Corp. limit (intersection of SR552). Project Description: On SR104, it is proposed to perform major rehab of the highway by reconstructing the highway surface in conjunction with the ODNR improvements to the Lake White Dam upgrades. Also the project includes replacing the existing bridge over Pee Pee Creek (also over Lake White Spillway) and improve the durability of the Lake White Dam by armoring the downstream face (Roller Compacted Concrete) to help protect the dam from impacts of flooding. This project is a ODOT/ODNR partnership for design, construction and construction inspection. 100% state.01/S<2/PV/State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D930FD822515B20091AF8AA2FEF0290746E05E51 117545~|~1~|~1~|~01/SAF~|~Roundabout - 100% Safety~|~21 - Safety~|~753ECB3E52B0292C39B5FCE212C6FB925376CCA6 116151~|~1~|~1~|~01/IMS~|~Resurface existing pavement with fine graded polymer modified asphalt concrete.~|~17 - Construction Engineering~|~C7A33A9C2A0A6FE84A9F31569952794DF72A1617 115060~|~1~|~1~|~01/NHS~|~Split for channel work~|~04 - Reconstruction - No Added Capacity~|~7DDA0183BC2374A522B267715FC533EBD17E485B 114662~|~1~|~2~|~02/NHS~|~Plan Split for the bridge work associated to HAM-50-11.12 bridge over Rapid Run~|~13 - Bridge Rehabilitation~|~0DB9B7620F9A4E4772170537D5F32E34F6AB97FB 114662~|~1~|~1~|~01/NHS~|~Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. ~|~66 - Resilience Improvement - Highway Project ~|~B7F565388C2D288EEBCA297B6441CD7DA3788B2D 77825~|~1~|~1~|~01/NHS~|~Resurface SAN US6 15.06-18.45~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E5653BF85E0AB83C573C8D3693787AD51DED7D46 77825~|~1~|~2~|~02/NHS~|~2 Bridges~|~13 - Bridge Rehabilitation~|~9A048E2D9B12A3FCE71F3C18DDF4C7CDEA997CBC 77825~|~1~|~3~|~03/NFP~|~Plan split for 100% requested items~|~05 - 4R Maintenance - Resurfacing~|~5815F5232F5C4DFE49DD3FD654FE708E63B9F002 99885~|~1~|~1~|~01/SAF~|~Relocation of SR 104~|~21 - Safety~|~F30079349F6642FF3C24EB85CBD4CA2DFF98FD78 124547~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement. ~|~44 - Other~|~5FA2D51279AA35FD2DE134F3EAB048F8AAC63C9A 124682~|~1~|~1~|~01/SAF~|~Plan split for all TSMO ITS work on project~|~24 - Traffic Management Engineering - HOV~|~01A9FA15C17A155CE962CAECCD861A08CEE960F9 113000~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~13 - Bridge Rehabilitation~|~B607FBC609E5D1DFAC4FFE575F1A084ABA9EB186 116672~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~AFAA05EF5768E3FFD5BBFC5833D930CF7AB2A9F3 116672~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~8B5E605CC5BE5FE0298C196718C7121A67E27583 116672~|~1~|~3~|~03/S5K~|~Marion Urban Area Plan split~|~05 - 4R Maintenance - Resurfacing~|~CB0076766AEA53EB61246570347BBE847DA5866B 116672~|~1~|~4~|~04/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~3094865B555D73BDA785B1D9EB89C4EE6DC89542 101052~|~1~|~1~|~01/STR~|~Chip seal various routes in Darke and Mercer Counties: DAR SR 726 SLM 0.00 to 4.00 = = DAR SR 49 SLM 32.03 to 35.96 = = DAR SR 118 SLM 8.58 to 12.42 = = DAR SR 118 SLM 16.61 to 17.67 = = MER SR 118 SLM 0.00 to 3.91 = = MER SR 219 SLM 14.01 to 17.67.~|~05 - 4R Maintenance - Resurfacing~|~43303D353BB679ED96A7A9135E81E956A5B46CC8 115095~|~1~|~1~|~01/NFP~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8DA0820B69A541DEC9FF4C96A26A6C8F6F4460E7 108586~|~1~|~1~|~01/NFP~|~The City will extend Wells Road in their Ashland Business Park approximately 2,700' east of Ford Drive eventually intersecting with SR250.~|~01 - New Construction~|~FA8CC921E02B0A76A9EECE2718A1D3551651709F 125784~|~1~|~1~|~01/NFA~|~D10 Various Pavement FY2032~|~05 - 4R Maintenance - Resurfacing~|~E218A017BA2F593DC8B02EC34DB1E367A84A5E84 125784~|~1~|~2~|~02/STR~|~D10 Various Pavement FY 2032~|~05 - 4R Maintenance - Resurfacing~|~63DF0337291EAB616DA298B0E1465578AD1F74D9 107851~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-38-0.00-0.62, 0.90-1.04, 1.57-8.24 FAY-41-23.54-23.70~|~05 - 4R Maintenance - Resurfacing~|~2A08DE3B2959C871316E0451D099946F3EA93D29 101756~|~1~|~1~|~01/NHS~|~Concrete pavement repair of SUM SR 8 from Graham Rd to just North of SR 303~|~05 - 4R Maintenance - Resurfacing~|~12DD737D8FC0C8A56EF942C6A51592A469C5BAEF 88432~|~1~|~1~|~01/ENH~|~Install sidewalks and curb ramps on various village streets including segments of State Route 121 on the Northeast Connector, Harrison Street North, and on State Route 121 South and South Main Street.~|~21 - Safety~|~FA1C50D3BD57C19404907C719C7BD4B3965FE36A 123651~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. ~|~47 - Bridge Preventive Maintenance~|~612C59AF3667C9672E215EF171C2DB33B949738C 107578~|~1~|~1~|~01/SAF~|~Installation of a single-lane roundabout at the intersection of SR-57 and Seville Rd. in the City of Wadsworth.~|~~|~5A66068D506BD6D09B04AE8D5DDE22EF6AC2D2FC 113918~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~05734D8E9D1605E0A4B9C2FCAABF9D006EF34B90 113918~|~1~|~2~|~02/NFP~|~Created for J&C involvement.~|~~|~338A399DF07480DB6D112A79749B519812AF9BEF 91063~|~1~|~1~|~01/MPO~|~LAW Ironton Trails & Walkways It is proposed to construct a new Ironton Trails & Walkways Intermodal Project. Phase 1. Beginning @ the new Ironton Transit Center on S. 2nd St., proceeding west on existing streets, there will be 1000' of bike lanes and intersection improvement; passing through an existing floodwall opening & along the riverfront there will be 1300; of shared use trai constructed west along the floodwall alongside a proposed access road, thru a future economic development site (1100') then continuing west 2400' along the base of the exising floodwall to the existing N. 2nd St bridge over Storms Creek. Bike lanes will be constructed on the Storms Creek Brdg, continuing 100' along N. 2nd St, creating a connection to West Ironton. A trail spur along Storms Creek 725' in length will connect the proposed Ironton Marina & Rec Facility back to 2nd St and the new Trail system. 80% KYOVA 20% Local (Ironton) 01/MPO/OT/Ironton~|~28 - Facilities for Pedestrians & Bicycles~|~29E7633A6FA527993F736A067D829A97079C7390 94327~|~1~|~1~|~01/STR~|~Plan split for resurfacing SR-163 from SLM 14.25 to 21.828~|~05 - 4R Maintenance - Resurfacing~|~A0D546B53EC5F1A2AF7C30A7C7304F4E6BF51E17 94327~|~1~|~2~|~02/S50~|~Plan split for resurfacing SR-163 from SLM 21.828 to 23.99~|~05 - 4R Maintenance - Resurfacing~|~ABEC6D4CB5ADE23DE6675154AA28B22E9C5B952A 94327~|~1~|~3~|~03/S50~|~Urban Paving Plan Split - ODOT + LPA funding~|~05 - 4R Maintenance - Resurfacing~|~976C65FCF07B1ACAE28AF51E7F88A1FE86C17821 94327~|~1~|~4~|~04/NFP~|~100% Local items, not eligible for Urban Paving (i.e., curbs, ramps, full depth repairs, etc.)~|~05 - 4R Maintenance - Resurfacing~|~A218D9F3D153973AE95DA97C9B3271EA4B571B47 120329~|~1~|~1~|~01/S5K~|~ATH-EAST STATE STREET SIGNAL IMPROVEMENTS~|~21 - Safety~|~945750753D87FECB87CABA4E31227507263FB561 88613~|~1~|~1~|~01/STR~|~Deck overlay (not Br eliglble):SFN 4900855, MAD-40-6.64R, Deer Ck~|~13 - Bridge Rehabilitation~|~445A07D2750380E09C047826E4DB02042DD26C91 88613~|~1~|~2~|~02/BRO~|~Deck replacement (BR eligible):SFN 4900812, MAD-40-6.64, Deer Ck~|~13 - Bridge Rehabilitation~|~D2B04740CF5A5D16495EBB828D9364A66E2A65E6 103778~|~1~|~1~|~01/STR~|~Landslide repair. NOB 145 7.20. Work length approximately 100 ft. DSR NOB-009.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~565DD79BEB113669EF62D229A5F5793178590D79 118985~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~52DDBAFE8051F5EB4D17A1E169DA25F7A732CBB2 88407~|~1~|~2~|~02/SAF/ECSE~|~Items in the plans Erie County Sanitary is responsible for~|~44 - Other~|~30269189B8730F47CF24F8CEAF4D3148F71425D5 88407~|~1~|~1~|~01/SAF/ERI~|~Improve Intersection / Turn Lanes / Sidewalks$1,000,000 commitment from Erie County / Turnpike Funds~|~21 - Safety~|~5A58D6D118229D8CE01FE0AF34C12D624D3A0266 88407~|~1~|~3~|~03/SAF~|~CE Ongoing services~|~17 - Construction Engineering~|~C0875E31042A89B50209697480177748670EE813 88407~|~1~|~4~|~04/SAF~|~Ethernet radios and hardware for signal coordination of 13 intersections will be purchased and provided by ODOT for the Contractor to install.~|~21 - Safety~|~49FF85D076993AF576C6C46ABB9AE619F713B331 81214~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Sealing of 1) 3002977 GUE IR77 9 Intersect: I-77 Over Csx Rr & Cr 431: Not BR Eligible: Length=267 SD/FO(0) SR=91.9 DSR=7; 2) 3002942 GUE IR77 8.88 Intersect: I-77 Over Csx Rr & Cr 431: Not BR Eligible: Length=267 SD/FO(0) SR=90.8 DSR=7; 3) 3003035 GUE IR77 9.14 Intersect: I-77 Over Leatherwood Ck: Not BR Eligible: Length=146 SD/FO(0) SR=91.9 DSR=7; 4) 3003000 GUE IR77 9.14 Intersect: I-77 Over Leatherwood Ck: Not BR Eligible: Length=146 SD/FO(0) SR=91.9 DSR=7; 5) 6003729 MUS IR70 27.04 Intersect: I-70 Over Sr 83: Not BR Eligible: Length=176 SD/FO(0) SR=91.0 DSR=6; 6) 6003753 MUS IR70 27.04 Intersect: I-70 Over Sr 83: Not BR Eligible: Length=176 SD/FO(0) SR=91.0 DSR=6;~|~13 - Bridge Rehabilitation~|~00F14BB2FE1507E85C1586C140C112A859CE75EC 81214~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge sealing of 1) 1600575 COS US36 29.88 Intersect: Evans Creek: Not BR Eligible: Length=122 SD/FO(0) SR=90.2 DSR=7; 2) 4500520 LIC SR13 22.39 Intersect: N. Fork Of Licking River: Not BR Eligible: Length=212 SD/FO(0) SR=95.5 DSR=7~|~13 - Bridge Rehabilitation~|~11EA3517B9CE7B7280016AF4D4DD6499DC3B58E6 81214~|~1~|~3~|~03/STR~|~"03/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge sealing of 1) 1601792 COS SR93 4.04 Intersect: Wills Creek #: Not BR Eligible: Length=390 SD/FO(0) SR=96.3 DSR=8 2) 3003647 GUE SR146 3.88 Intersect: 146 Over Abandoned Rr: Not BR Eligible: Length=158 SD/FO(0) SR=99.9 DSR=8 3) 4200152 KNO SR3 24.4 Intersect: Little Schenck CreekRr: Not BR Eligible: Length=74 SD/FO(0) SR=93.9 DSR=7 4) 3004325 GUE SR209 14.48 Intersect: 209 & 821 Over Wills Cr #: Not BR Eligible: Length=234 SD/FO(0) SR=97.6 DSR=7; 5) 6000843 MUS US22 22.78 Intersect: Over Georges Run & Csx Rr: Not BR Eligible: Length=271.9 SD/FO(0) SR=85.9 DSR=8;~|~13 - Bridge Rehabilitation~|~DA5CD6BFB84553BA1AAAD75447BC32EF174D7C4B 81214~|~1~|~4~|~04/S<2~|~"04/S<2/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Sealing of 1) 6000495 MUS US22 11.59 Intersect: Muskingum River And Canal: Not BR Eligible: Length=709.2 SD/FO(0) SR=76.7 DSR=6; 2) 6001351 MUS US40 11.24 Intersect: Licking& Muskingum Rivers: Not BR Eligible: Length=953 SD/FO(0) SR=76.7 DSR=7; 3) 6006280 MUS SR555 11.34 Intersect: Over Muskingum River: Not BR Eligible: Length=543 SD/FO(0) SR=90.1 DSR=6;~|~13 - Bridge Rehabilitation~|~F5C7216D84863D90E6F5A04C71BA0B208982F5AA 107507~|~1~|~1~|~01/S<2~|~Resurfacing COL-45 from SLM 16.92 to 18.99~|~~|~77E1165F76D898291C9CFDB8E51475B4D9FCBA68 107507~|~1~|~2~|~02/STR~|~Resurfacing COL-45 from SLM 18.99 to 19.63~|~05 - 4R Maintenance - Resurfacing~|~3499229DF69F9A4BEB77D3239789BDAD03637AC2 96877~|~1~|~1~|~01/NFP~|~This is the district's FY18 district wide lighting maintenance construction contract using 4CP7 sac code.~|~21 - Safety~|~0E66EF5D23A18583B989D87F3DA0A122BC9BD31A 114577~|~1~|~1~|~01/NHS~|~Rockfall repair project. MEG 33 9.36. Work includes drape and trim blasting.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~71E75BC4EB0409CC99055C99908E6C84EA80880A 98566~|~1~|~1~|~01/BRF~|~Bridge replacement project. MOE CR16 3.36, SFN 5632358.~|~10 - Bridge Replacement~|~3D60905BCCCA94728896F9E992E9206B7349B35B 98503~|~1~|~2~|~02/S>2~|~Resurfacing TRU SR 169 6.44 to 6.77~|~~|~638C403DD1D6DFBDE893640D10C2CFAA56076334 98503~|~1~|~1~|~01/S>2/NILE~|~Resurfacing TRU SR 169 5.72 to 6.44 in the City of Niles.~|~~|~BC39A95AF29E3CE9BFBD284FB6F14C2350FC9C9F 118661~|~1~|~1~|~01/STR~|~WAS SR 60-15.79 200 ft landslide repair with drilled shafts.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B91DD8A80C256FF5E6A10E1C523A0DEA1E26FA1B 102558~|~1~|~1~|~01/STR~|~CLI-73-1664 replace structure.~|~04 - Reconstruction - No Added Capacity~|~DDB632792219FFE0F03FBF9E47E5D19AA34114FB 88762~|~1~|~1~|~01/STR~|~Replace deteriorating concrete deck. Include rehabilitation/replacement of bearings, backwalls and expansion joints on SFN 5504058 MIA SR 202 0849 (Lost Creek).~|~13 - Bridge Rehabilitation~|~736642E7787A509F8810D7D83D10D2B828E2FC10 111399~|~1~|~1~|~01/S<2~|~Pomeroy Main Street emergency stream bank and shoreline protection project on MEG SR 833. 100% State funded through the MEG Co. TID.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~01AB7BE58A1AFD70AEF56B75E61DB5C96DA5D365 105018~|~1~|~1~|~01/STR~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~EA939EBC5BD9A43B026EFEFDD47DDC28A3755757 92242~|~1~|~1~|~01/NFA~|~Wash water system for the COL/TUS county garages.~|~~|~4D99A35D6D366C03CE98964F9C0D459BDB3BA290 119617~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items~|~21 - Safety~|~92E01FDE642309B82E1359DE8180996378376DB0 98761~|~1~|~1~|~01/S<2~|~Pavement marking on various county roads 100% 4B77~|~21 - Safety~|~5DBA3BAC31D5D4DFD646252CC811BC511D8B2562 114537~|~1~|~1~|~01/BRO~|~Split for bridge rehab work~|~13 - Bridge Rehabilitation~|~1B299F869F40AB79B519D5C1F931351064736A05 124900~|~1~|~1~|~01/MPO~|~MPO CRP funding~|~28 - Facilities for Pedestrians & Bicycles~|~6A85940476B16F9CEF85079FEE6D174F8C71B278 124900~|~1~|~2~|~02/MPO~|~Plan Split for MPO funded SUP on Cherry~|~28 - Facilities for Pedestrians & Bicycles~|~1A7F807F1FD2EECDB04D98965A915FF09C0AFD86 124900~|~1~|~3~|~03/SAF~|~Plan Split for Safety funded Spielbusch Ave, Erie St, and Beach St improvements~|~21 - Safety~|~B54C928D95A529EA1862816A6D28D13975EE34A8 86453~|~1~|~1~|~01/IMS~|~Deck overlay - steel beam structure. Agler road over I-270. SFN 2512092~|~13 - Bridge Rehabilitation~|~B655BCC03517A65AA6A6B662FF1B3C02DF0DB43C 117000~|~1~|~1~|~01/MPO/LEB~|~Construction of a shared use trail on new alignment from Mound Street (south of Main Street), primarily along abandoned RR bed, to Monroe Street near the SR 48 Bypass.~|~28 - Facilities for Pedestrians & Bicycles~|~7AE28D73C1B84DA927416BB60068E53C6D9B6BD0 23035~|~1~|~2~|~02/S>2~|~100% local funding for non-fed eligible work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D794A17DFBB98BCD98C3DF37CCAF5C284F756CA8 23035~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split using MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F9B960BC257651A4FB53C0B4BECE1A5F99753069 91974~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7767870 Brandywine Drive Bridge over Brandywine Creek and SFN 7767862 Blackberry Drive Bridge over Brandywine Creek. City of Hudson, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~3E679D8BAE142700F63DD9930069A570E06FE34C 88084~|~3~|~5~|~05/CMQ~|~Part 3 - Plan split for the CMAQ funds - Dorr St and McCord Rd Roundabout~|~21 - Safety~|~D875E552C8A7A1FC4CB4A7E9ACB8F54D65A26083 88084~|~1~|~1~|~01/IMS~|~Part 1 - I-475 Pavement Plan Split~|~03 - Reconstruction - Added Capacity~|~728D3D6A83B20FB5102A3F390C69E98320120902 88084~|~1~|~2~|~02/IMS~|~Part 1 - I-475 Bridges plan split4807626 LUC IR475 6.48 Intersect: Cr 30-Hill Ave4807650 LUC IR475 6.48 Intersect: Cr 30-Hill Ave4807685 LUC IR475 7.53 Intersect: Cr 24-Dorr Street4807715 LUC IR475 7.53 Intersect: Cr 24-Dorr Street~|~13 - Bridge Rehabilitation~|~45BAA735B56F8D48E19A9F60ADC1DBDF976F7D35 88084~|~1~|~3~|~03/IMS~|~Part 1 - I-475 Noise wall Plan split~|~44 - Other~|~5DD82958F977CBE7B4569A482EC1C95EE6DFAB4A 88084~|~2~|~4~|~04/IMS~|~Part 2 - New Interchange Plan split~|~03 - Reconstruction - Added Capacity~|~860024216B395DFF2592D25719C0D816FC9CF18C 88084~|~2~|~6~|~06/IMS~|~Plan split for 100% state paid incentive on Dorr St Interchange~|~03 - Reconstruction - Added Capacity~|~205CA8F62D0093E9E61BB82A56AB6600E033526E 88084~|~2~|~7~|~07/IMS~|~Plan split for 100% Local paid incentive on Dorr St Interchange~|~03 - Reconstruction - Added Capacity~|~4BF03F4F9FB3F4ACF8735AF1EF314A497AF4440F 109597~|~1~|~1~|~01/BRO~|~Rehabilitation work on the Center Street Swing Bridge eligible for federal-aid~|~13 - Bridge Rehabilitation~|~9FE7555C6C308E4C8308C51FABF8582E535BABF6 109597~|~1~|~2~|~02/NFP~|~Split 2 for quantities at 100% local cost~|~13 - Bridge Rehabilitation~|~DBB8EC77C79357E9188AA88CC95EAA90B30ED3E6 120068~|~1~|~1~|~01/NFA~|~NEVI Round 2 - 675-A~|~63 - Electric Vehicles & Charging Infrastructure~|~A8A1A9D5DBD9FE9DAE80515F4B9912BC7AE9CDCE 103520~|~1~|~1~|~01/NFA~|~Plan split~|~47 - Bridge Preventive Maintenance~|~17B2829F1F26B7DE0BC6461C7BA7AB9DF3AAF87F 102671~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 8102287.~|~~|~B205E3A5B339614B87126C1D5E6BC150E8327CF9 88376~|~1~|~1~|~01/BRO~|~Repair abutments on each mainline structure by patching and using galvanic anodes on SFN 5700965 MOT SR 4 20.92 L and SFN 5701023 MOT SR 4 20.92 R~|~13 - Bridge Rehabilitation~|~7E56A6878198688983AC4DC9474DB742B68DA50D 98044~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 2.94 to 10.14~|~05 - 4R Maintenance - Resurfacing~|~81E0472FC9B10A7573888872C78EEF2E4D9336F5 97307~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation~|~15 - Preliminary Engineering~|~043E3AA438AFD289CA93ADCA70AFCCD148C50A9C 99042~|~1~|~1~|~01/SAF~|~Installation of a traffic signal and widening of the WB exit ramp to 2 lanes at the intersectopm pf tje WB OR 70 ramp and SR 149~|~21 - Safety~|~D0CB805BA6B3125F6AEEE301934645D23989D091 114433~|~1~|~1~|~01/S<2~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~B35FA6A53669BD62E750FF46561DB6AF54AB5506 104146~|~1~|~1~|~01/NFP~|~Guardrail~|~44 - Other~|~13396866137E65FE0C37A0F5D32A8913928F17F5 118478~|~1~|~1~|~01/MPO~|~Federally eligible items~|~05 - 4R Maintenance - Resurfacing~|~66B5BE6E17AB20CE0056CBA613B35635D5193FEA 92169~|~1~|~1~|~01/NFA~|~Adding a new access road and parking area in Eastlake MetroPark~|~44 - Other~|~4B4A384E624B6351FB0B27F46C9EC628AE1483FE 100534~|~1~|~1~|~01/S<2~|~Resurfacing of COL-154 STP-urban section (SLM 2.27 to 5.63)~|~05 - 4R Maintenance - Resurfacing~|~996741F5844975C33FF1626B93A37984E1798929 100534~|~1~|~2~|~02/STR~|~Resurfacing of COL-154 STP rural section from SLM 5.63 to 9.85.~|~05 - 4R Maintenance - Resurfacing~|~99B7E89327713F44F1E57024A9D091742FECCE8E 113583~|~1~|~1~|~01/STR~|~Bridge replacement split~|~10 - Bridge Replacement~|~88BEFF7E2414949200F3BB6424391CE956F09480 113583~|~1~|~2~|~02/STR~|~Plan split for work associated with conduit replacement~|~04 - Reconstruction - No Added Capacity~|~6E7F7466C053F90CB00095D93EA7A1C32B7EB720 107985~|~1~|~1~|~01/NFP~|~Highway Lighting maintenance~|~21 - Safety~|~01EA4B6EAF885F692D84B032154661BF386F0A2B 88930~|~1~|~3~|~03/BRO~|~BR Eligible: SFN 7803052 3.98 US62 over Mud Run~|~13 - Bridge Rehabilitation~|~55296206A1EAE97B562B690C5665EDB629450479 88930~|~1~|~4~|~04/NHS~|~not BR Eligible: SFN 7803087 4.48 US62 over Mud Run~|~13 - Bridge Rehabilitation~|~CD36A1045F1E8E5F8D1606F68EA0B3951A18C20A 88930~|~1~|~2~|~02/NHS/HUBB~|~80/20 Resurfacing of US Route 62 from SLM 3.57 to SLM 4.56 in the City of Hubbard, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~A6B660C730E5DB3BF8D411D2A6C03F4F41C13AA5 88930~|~1~|~1~|~01/S>2/HUBB~|~80/20 Resurfacing of US Route 62 from SLM 2.57 to SLM 3.57 in the City of Hubbard, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~B5778C4C050264204632FF828E488921E61F6EBE 88930~|~1~|~6~|~06/NHS/HUBB~|~100% City Funded Items along US Route 62 from SLM 3.57 to SLM 4.56 in the City of Hubbard, Trumbull County, Ohio.~|~44 - Other~|~C58A7AB2032B9DF18B8464C9761299ECFAC30264 88930~|~1~|~5~|~05/S>2/HUBB~|~100% City Funded Items along US Route 62 from SLM 2.57 to 3.57 in the City of Hubbard, Trumbull County, Ohio.~|~44 - Other~|~0E986C4322C83AE765122E83C497ADEB06D1329C 76771~|~1~|~1~|~01/IMS~|~Placeholder plan split~|~05 - 4R Maintenance - Resurfacing~|~6B19EA98FCF9A3925BAE5341D8B4C15E8D16CE2B 96332~|~1~|~1~|~01/STR~|~It is proposed, on SR327 from the corp limit of Wellston (SLM 11.60) to the Vinton County Line (SLM 21.24), to resurface the highway with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~E0BC96294632EF8A919C31C8E006CF7530E2CED5 114994~|~1~|~1~|~01/NFP~|~All work in this plan spit using 100% state funds SAC 4PS7.~|~13 - Bridge Rehabilitation~|~D939921532EF616FC7BC95D548CC71FC2DB400F7 84484~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2018~|~99 - State Preventative Maintenance~|~407E25B7BEB8533056627BDDF5D00E81E906408A 84484~|~1~|~2~|~02/NHS~|~Crack sealing on NHS route for 2018.~|~99 - State Preventative Maintenance~|~EEC32146042574330E842A42D5D10954F08B4CC5 91988~|~1~|~1~|~01/STR~|~LAW SR93 Resurfacing projectRural Portion: 1.13 - 10.86On SR93, begin project @ its intersection w/US52, north for 10.86 miles and terminate 0.27 mile north of TR622. Pave Thru Brdgs:4401298 LAW SR93 2.47 Intersect: Hecla Branch4401336 LAW SR93 3.43 Intersect: Trib. Of Norris Branch4401360 LAW SR93 3.91 Intersect: Norris Br Of Storms Creek4401425 LAW SR93 7.18 Intersect: Ellisonville Creek80/20 split~|~05 - 4R Maintenance - Resurfacing~|~2B8802C8010ECE290B2213F005F2785DCA5D8358 91988~|~1~|~2~|~02/STR~|~LAW SR93 Brdgs F/Rehab:4401395 LAW SR93 4.1 Intersect: Storms Creek4401417 LAW SR93 6.37 Intersect: Trib Of Ellisonville Cr4401441 LAW SR93 7.76 Intersect: Etna Branch4401476 LAW SR93 8.66 Intersect: Cannon Creek4401514 LAW SR93 9.38 Intersect: Cranes Nest Creek4401549 LAW SR93 9.93 Intersect: Cranes Nest Creek80/20 split~|~13 - Bridge Rehabilitation~|~D10007D8584800886B5A9211453061F827068FFC 91988~|~1~|~3~|~03/S<2~|~LAW SR93 Resurfacing projectUrban Poriton: 0.50 - 1.13On SR93, begin project @ its intersection w/US52, north for 10.86 miles and terminate 0.27 mile north of TR622.~|~05 - 4R Maintenance - Resurfacing~|~AA5C90CAAD517A67309EBDC7F0E5209A8647F5B6 118778~|~1~|~1~|~01/STR~|~added plan split for rockfall remediation and culvert replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1118263AABE3B126E7047BFA5D1D6533FF236E57 90271~|~1~|~1~|~01/ENH/MPD~|~Construct multi-use path within the City of Medina by Medina County Metroparks, including bridges. NOACA money is capped at $832,512. Park District has agreed to pay any amount over that at 100% local.~|~28 - Facilities for Pedestrians & Bicycles~|~F328BBCD880C208C7A2A65AB84FFA5016E5C292C 105523~|~1~|~4~|~04/MPO~|~MORPC/Columbus funding for aesthetic enhancements on Front & High St bridge caps, also landscaping along Front and Fulton Streets~|~31 - Landscaping & Other Scenic Beautification~|~9EB7C7889BA3241B40B477C54E13E38585FECB0F 105523~|~2~|~10~|~10/ENH/Cols~|~MORPC/Columbus funded enhancements~|~31 - Landscaping & Other Scenic Beautification~|~4F0D37E1489DE166C90B49FCE0A3264C9530D2AB 105523~|~1~|~6~|~06/ENH/COL~|~Incremental items - Brick Paver Walk, Granite Curb and Lighting Items - Columbus to pay the difference above standard items~|~04 - Reconstruction - No Added Capacity~|~81A288E34FFA24E89FD21C03F99B5170EFB7AE82 105523~|~2~|~12~|~12/NHS/INC~|~Incremental items - Brick Paver Walk, Granite Curb and Decorative Lighting Items - Columbus to pay the difference above standard items ~|~04 - Reconstruction - No Added Capacity~|~BBEA4658FA686954A947690B2BF2F82A959C45F2 105523~|~2~|~11~|~11/NHS/Cols~|~100% City of Columbus items. Rebuilding Second St from Mound St to Noble St. including brick paver sidewalks, lighting ,underground utilities, etc.~|~04 - Reconstruction - No Added Capacity~|~EDEB3812064E70ABBB5C1B8D053647F9AAEEECBD 105523~|~1~|~1~|~01/NHS~|~IR 70 pavement reconstruction from SR 315 bto High St. Includes Fulton St and Front St. Also includes project eligible utility items: sanitary, water work, electrical, traffic surveillance~|~03 - Reconstruction - Added Capacity~|~168067D02D988D943A92C46186F7CD18B2AB1C86 105523~|~1~|~2~|~02/NHS~|~"NH funding for construction of 7 new bridges:FRA-70-13.01A SFN 2510014 Ramp C5 over SR315FRA-71-15.18A SFN 2510013 Ramp A5 over Scioto RiverFRA-70-13.21A SFN 2510015 Ramp A5/B5/C5 over Scioto RiverFRA-70-13.57A SFN 2503749 Ramp C5 over Electrical VaultFRA-70-13.58A SFN 2510017 Ramp C5 over CXS & NS RRFRA-70-13.73A SFN 2510019 Ramp C5 over Short StFRA-70-13.90C SFN 2510021 Ramp C5 over 70/71"~|~08 - Bridge - New Construction~|~54FE41B2963C1EF06A78F16682599363E30BEE2B 105523~|~1~|~3~|~03/NHS~|~Structure replacement: FRA-70-13.73R New SFN 2510020 (existing SFN 2504537); I-70 EB over Short; Structure replacement FRA-70-13.95C New SFN 2510023 (existing SFN 2504561) S Front St over 70/71 (adding exit lanes):FRA-70-12.82R SFN 2504669 Ramp C5 over Souder Ave.~|~03 - Reconstruction - Added Capacity~|~5EE8223713B14475DC3AC8E06B9FE248C5C205B6 105523~|~2~|~8~|~08/NHS~|~IR 70 existing pavement reconstruction from railroad bridge to Front St., resurfacing and restriping IR 70 from Front St to Grant Ave, Ramp D7, and local streets (Mound, Short, Civic Center, Second) IR 70 widened pavement from railroad to Front St. and retaining walls. Also includes eligible utility items (waterworks, sanitary, electric, etc)~|~03 - Reconstruction - Added Capacity~|~BB32CD7A48ACD3FBFEE1EE8A589D47203FD5BD42 105523~|~2~|~9~|~09/NHS~|~Bridge replacement - FRA-71-1503L (I71 SB over railroads, Scioto River, and SR 315. Existing SFN 2504413 Rehabilitate IR 70 over Short St bridge by closing gap between bridges for MOT~|~10 - Bridge Replacement~|~CC7F06FCD34DBB3B81F88C91C534F8057C3B1E32 105523~|~1~|~5~|~05/NHS/COL~|~100% City of Columbus funding for additional cost to put electric lines underground rather than leaving overhead. Includes Livingston Ave. Phase A (between Front St and High St intersections).~|~43 - Utilities~|~0DE00F501CA6117070B8DE1C00EFFDED44268DDD 105523~|~1~|~7~|~07/NHS/AEP~|~AEP items to be done as part of the project to be paid 100% by AEP~|~43 - Utilities~|~7D2E2E5743721B1B13191A090D6D0952FB33EC72 108887~|~1~|~1~|~01/NFP~|~TID will construct the Firestone Business Park project~|~44 - Other~|~66919D37B24AA0C9C46AC42BF3A053A5EA460889 120918~|~1~|~1~|~01/SAF~|~Plan split for guardrail maintenance~|~21 - Safety~|~2FC20C49B7FADF4B1242CF1BCE8A02D97CACC7DD 120918~|~1~|~2~|~02/BRO~|~Replace GR on SR-184 bridge over Silver/Shantee Creek (LUC-184-0892) that was damaged in a crash~|~13 - Bridge Rehabilitation~|~E27DBDF94B5F2AFB84451E289644FB0BC7E6C845 125245~|~1~|~1~|~01/STR~|~Bridge replacement.~|~04 - Reconstruction - No Added Capacity~|~F3DDBD02BD713C6872EBF4DDBD23AB409B072236 109950~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 379 0.90.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B65020AC115A9A1C2EAAE89DAD979B50D37FA9E9 110458~|~1~|~1~|~01/SAE~|~Construct a northbound right turn lane on SR-747 at SR-4. Remove the existing slip lane from northbound SR-747 to SR-4. Rebuild the existing signal.~|~21 - Safety~|~CAF95436E1A0BE180C7821049BD70E1011703315 87545~|~1~|~1~|~01/BRO~|~Replacing bridge on Division Street over Mahoning River~|~10 - Bridge Replacement~|~1BAA785944F13F4D6F7CC9927E806A435B592BA0 101980~|~1~|~1~|~01/STR~|~Landslide Repair, DSR# BEL-029~|~04 - Reconstruction - No Added Capacity~|~CE8BB0D1093202E192C447C4ADCCD6E15EC33144 79789~|~1~|~1~|~01/IMS~|~90/10 District Allocation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~496635F9BE00CC98BA0DD0753D95402C408369F1 79789~|~1~|~2~|~02/IMS~|~Bridge Work: MED-71-14.99 (R)~|~47 - Bridge Preventive Maintenance~|~7E9BC7C8B686E7A1BAA47E99A07375E21865D87C 20344~|~2~|~2~|~02/NHS~|~Phase 2; New alignment of US-30 from Trump Avenue to State Route 44, in Canton Township and Osnaburg Township, Stark County, Ohio.~|~01 - New Construction~|~871E9F753C67DEE771869335EE8F875BCC31D4CA 20344~|~1~|~1~|~01/NHS~|~Phase 1; Mine Remediation~|~17 - Construction Engineering~|~0570A1F8D91CD973B3A83DD401ECECFAC7D85F4E 20344~|~1~|~3~|~03/NHS~|~Construct new bridges on future US 30 alignment.~|~01 - New Construction~|~792401BD7887C7B44FE6B5D1BFA21835E72577B1 20344~|~1~|~4~|~04/NHS~|~Construct new culverts along future US 30 alignment.~|~01 - New Construction~|~F2C4BF6EE8CF43E92F1D487DAD85E444CE096014 123757~|~1~|~1~|~01/BRO~|~Bridge Maintenance ~|~47 - Bridge Preventive Maintenance~|~3B1C376C0F08560F11FE402A27B72B4531AF7CD9 106134~|~1~|~1~|~01/NHS~|~Replace structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~ED98655D01E95057A3B237990FCAA44277DD6BD3 114444~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~4643B872A258AB553281D584E6596E769C598885 101197~|~1~|~1~|~01/STR~|~Plan Split 1 created, contains US (non-NHS) and SR routes in Madison/Franklin Co.~|~05 - 4R Maintenance - Resurfacing~|~598FAEF5CF4E8A7F3EB05AE5114CB38FF8BD6B68 99802~|~1~|~1~|~01/CMQ~|~Construct Roundabout eliminating 5 leg intersection were Western Reserve Road, North Lima Road and Springfield Road intersect.~|~21 - Safety~|~01249411A6799A1BF9E6CE4357DDC665EFCB46D1 110586~|~1~|~1~|~01/BRO~|~All the work for replace the bridges. District federal and state funds.~|~10 - Bridge Replacement~|~C0ED081F0D7B61BA8ED75043B7A911B1202880DD 123894~|~1~|~1~|~01/CMQ~|~Reconstruction of the existing traffic signal at the intersection of Dayton-Xenia Road and North Fairfield Road and connection into the City of Beavercreek's fiber optic system.~|~21 - Safety~|~1D64FDBA5F3F893F643762ACABE65FF2B2FB9065 116057~|~1~|~1~|~01/NFP~|~Plan split for RPM maintenance~|~21 - Safety~|~402E67E7870C92B4EDE1E452349D848F6C4C6C6D 100576~|~1~|~1~|~01/S<2~|~LAW 141 (0.88-0.91)~|~05 - 4R Maintenance - Resurfacing~|~0AB4E3CB1C620E334A79811DF64F12598F7E4AD8 100576~|~1~|~2~|~02/STR~|~LAW 141 (0.91-16.37)~|~05 - 4R Maintenance - Resurfacing~|~2652E8DA8D8F2092E421AD898A06453262D0CD01 120257~|~1~|~1~|~01/S>2~|~Pedestrian improvement along Fairway Blvd ~|~28 - Facilities for Pedestrians & Bicycles~|~7EB23798AD197B60D12912FAC22AC3AAF670BC37 122109~|~1~|~1~|~01/NFA/PER~|~Perry County CEAO Federal/State Exchange Program Funding - 4B87 (80% Federal) / LNTP (20% Local Match) - Replacement of SFN 6434711 carrying over Little Monday Creek~|~10 - Bridge Replacement~|~028FA4805380749682B93D137FD0E054037BEA4E 119214~|~1~|~1~|~01/STR~|~All items of work associated with routes located within the STP Rural Area.~|~05 - 4R Maintenance - Resurfacing~|~5AC8C5B98175B3296FE06A4A17811599339E8E67 119214~|~1~|~2~|~02/S5K~|~All items of work associated with resurfacing of SR-41 within the Washington Courthouse Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~B12A8B314D8F383C82C37450101C6319B2DD6D86 117097~|~1~|~1~|~01/ENH~|~TAP funding for all work associated with this project. Funding is 95% federal funds through the use of Toll Revenue Credit (TRC). The match and any funds over the cap to be provided by the City of Findlay. ~|~28 - Facilities for Pedestrians & Bicycles~|~8D55FE740DF79A6A6587534844F8D103E5DBE9B1 94457~|~1~|~1~|~01/BRF~|~Replacement of 78' Steel Pony Truss Bridge SFN 3948315 located in Huron County, Greenwich Township on Omega Road (TR 145)~|~10 - Bridge Replacement~|~AACCABF23B9B6BBB254880B4F71FF4D97AA0BBFE 92413~|~1~|~1~|~01/NFA~|~Pavement repair, resurfacing with asphalt concrete at Deep Cut Park on State Route 66 nine miles North of St. Marys.~|~05 - 4R Maintenance - Resurfacing~|~3C8B3D3CB6E217EC7BFDD60A9FE1CBF3207AE1FA 123502~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~E04DB6AD3BCF8FE8DC5FA7CBA79A0D4803B35720 101269~|~1~|~2~|~02/S>2/CANT~|~Resurfacing, urban paving in the city of Canton. Includes alt bid items for radar vs loop detectors.~|~05 - 4R Maintenance - Resurfacing~|~0166D8D978676F2FAA8297F3762B3657A1CFE96C 101269~|~1~|~1~|~01/NHS/CANT~|~Resurfacing, urban paving in the City of Canton. Includes alt bid items for radar vs loop detectors.~|~05 - 4R Maintenance - Resurfacing~|~F664ED5ED35CB4C10C73E60763D41B6F86ECB103 101269~|~1~|~3~|~03/NHS/CANT~|~Full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~E2353295AE839BA79153485ADB288DE113F63B9D 100074~|~1~|~1~|~01/STR~|~Superstructure Replacement~|~13 - Bridge Rehabilitation~|~4F8D23B5CE18BA42697A0E72AD4D0FEF0B41CE2B 110548~|~1~|~1~|~01/STR~|~FAY-41 from 24.45 to 29.05 and MAD-41 from 0.00 to 1.24, 1.96 to 3.85~|~05 - 4R Maintenance - Resurfacing~|~C9E6C7E85895D56DF2D9B5B5EF89D26286960E83 111525~|~1~|~1~|~01/MPO~|~MPO Funded items~|~28 - Facilities for Pedestrians & Bicycles~|~F340B83664BB2B09810F8A5FC291A4A95A537E39 111525~|~1~|~2~|~02/NFP~|~Plan Split for scope items that are not Federally eligible, such as proprietary lighting.~|~~|~0D3B3236CB9313BE187F90BE5E03066891CC67BC 113265~|~1~|~1~|~01/MPO~|~Split for MPO fund federal-aid eligible work.~|~05 - 4R Maintenance - Resurfacing~|~8342F57A1F37D902D9F0B0C90F8B63A7ACA60AA9 113265~|~1~|~2~|~02/NFP~|~Plan split for non-eligible waterline work using 100% local funds.~|~05 - 4R Maintenance - Resurfacing~|~9DF2F0B8E14B9D2B150C9590A04165110237C784 89257~|~1~|~2~|~02/S>2~|~Plan split for resurfacing items at 100% local cost~|~17 - Construction Engineering~|~FCC502A234358DFFCFEBC06C34E1DBD89A99DFD2 89257~|~1~|~1~|~01/S>2~|~Plan split for Urban Paving eligible work items at an 80/20 pro rata.~|~05 - 4R Maintenance - Resurfacing~|~CF260D531A181246A7261BD4D09471FCD24C21F2 77526~|~1~|~1~|~01/IMS~|~Plan split for all eligible work on this project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B6FD78DF45899DC38166D029465F5C3F420F9BAF 101362~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 555 23.76-26.73. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~86C02CF61CA5C68CD15890E38BA0C0E62D9EEBD7 101362~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 37 0.00-8.22, MRG 669 0.00-2.64 and PER 669 12.43-13.27. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~DC41A6E3D2DA2C2EC2718B8B4C24D53C03FED93B 107349~|~1~|~1~|~01/NFP~|~D09 Mowing FY 2019 & 2020~|~17 - Construction Engineering~|~C8039D11873873726DC95B67E0CD9164D8628EDA 121462~|~1~|~1~|~01/ERD~|~Major reconstruction of SR 39 in the City of East Liverpool utilizing MPDG Rural Grant Federal funds at 80% up to CAP.~|~04 - Reconstruction - No Added Capacity~|~7B26EBE7CEDAC7AED3F7817F1032047C9D755E05 106126~|~1~|~1~|~01/S>2~|~West Riverview bike path in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~8E4B91574C2E4FF833EF37993A9E31A86770A6FA 111095~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Replacement of the Deck and superstructure on SFN 3002675~|~13 - Bridge Rehabilitation~|~E388287802DAA85079D26F24590425E26E061381 90384~|~2~|~2~|~02/S>2/PICK~|~"02/S>2/OT/PICK" - Local Funds 4BG7 (100% Local) - No CAP - Water line work.~|~~|~E5CEEE250DF978695DCD4B1D1E44BCD13B0D5D27 90384~|~1~|~1~|~01/S>2/PICK~|~"01/S>2/PV/PICK" - MORPC STP Funding 4TA7(80% Federal) / 4BG7(20% Local) - CAP of and $1,203,048.00 STP federal funding. - Realignment of Milnor and Meadows with site distance adjustments~|~~|~80F169E07A85BF05140307540C78146E575A1B3D 96830~|~1~|~1~|~01/ENH/NEWC~|~"01/ENH/OT/NEWC" - Village of New Concord Transportation Alternative Project - 4B37 (Federal 80%) / 4BG7 (Local 20%) - CAP 4B37 of $218,304 - Installation of Decorative lighting, brick crosswalks and various accessories along US22/40 from east corporation limits to S Bridge Parking area.~|~28 - Facilities for Pedestrians & Bicycles~|~5495B1C07B2F73A6DDA728DD0BEEDA97D57E36EF 109829~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements.~|~21 - Safety~|~B5210FC4A4BFC192AAA5EE0FE409E7CE220FB2C9 122961~|~1~|~1~|~01/MPO~|~Plan split for eligible road rehabilitation work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BF0362D54F746FDBDCE9FC4D888D7C2A4AA44045 122961~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~900E9C16BC824DF52297D3C995BE79BF350566D3 120638~|~1~|~1~|~01/NFA~|~Slope stabilization along SR 188 in Fairfield County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5575B4EDA8E33FDC4753FD210B047D364867B459 108260~|~1~|~2~|~02/STR~|~Landslide repair from OH18-01 ER event. DDIR# JEF-006.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8FD5F08D5659D4AB4DC3E758F119831AADFA64B1 108260~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. DDIR# JEF-005.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9A27DAFC86894BB77C821848E17C3C6053C6B55B 95466~|~1~|~2~|~02/S>2~|~D6 funding to replace 8 culverts under SR-315~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2673EE4477B40AA6F27FDC625F3B5181C01501EA 95466~|~1~|~1~|~01/S>2~|~Geotechnical funding (up to $3.0 M) and then D6 funding for slope stabilzation along Olentangy River~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BAAEF9F2D6A63CE572A6572AECABBF38EC7138CD 109665~|~1~|~1~|~01/NFP~|~Crack sealing various routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E1F8E5B251C3865FC804F7EC1F1278FF8809F330 125677~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~AC9FF96E2891024928575B2D4246A2A0DFFE3351 108127~|~1~|~1~|~01/S>2~|~slide repair work eligible for federal/state GSM funds~|~44 - Other~|~3D558F0878883C66304BE9471418854EB006AD9F 93986~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities Funding 4MA7 (100% State) - No CAP - Construct a new salt dome~|~~|~E8E4533A5E5DB50A9AECE67647CAB80F4243A8C1 94525~|~1~|~1~|~01/IMS~|~Remove and replace mainline structures over Zenia RD. Structures will be widened to accomodate maintenance of traffic. SFN 1204327 CLA 70 1208 L and SFN 1204351 CLA 70 1208 R.~|~~|~A60DB16A3219CE22DE4C718406E761FFDB7D8CDA 95244~|~1~|~1~|~01/SAF~|~Re-aligning Vandemark Road and installing a new traffic signal, re-aligning the intersection of Folkerth Avenue and Wayfarer Avenue and installing a new traffic signal, intersection access management at the intersection of SR 47 and Wilkinson Avenue and access management at the business drives. SLM 13.74 to 15.17.~|~21 - Safety~|~B21D50B4D4250AE28BB87981199F41BEA3DC1F85 107029~|~1~|~1~|~01/NFP~|~Districtwide Guardrail repairs.~|~44 - Other~|~2439F94EB737C2122DADDCD357C1AD5D03720DB5 106802~|~1~|~1~|~01/NFA~|~The Village will construct improvements to seven different intersections, access points and exit ramps that need widening, restriping, or reconstruction within the Village of North Randall~|~01 - New Construction~|~104C3924431222BB63986944B5F9F65B1C4C6BA9 93143~|~1~|~1~|~01/S>2~|~Columbus urban paving of US-62, SLM 17.66-19.62~|~05 - 4R Maintenance - Resurfacing~|~EA3397B73FC3204096BF02172CDEF31E89CA7C3E 114971~|~1~|~1~|~01/STR~|~This split is for the rural section of the project. Funding is from the district preservation program using SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~86158B84F96EBA2EC52F56757B4FB93A575A790E 90661~|~1~|~1~|~01/MPO~|~Resurface Crissey Rd LUC CR65 2.45-3.54~|~05 - 4R Maintenance - Resurfacing~|~9335B901DF6A70A9E4A06787131D552D638D48ED 97986~|~1~|~1~|~01/STR~|~ADA SR 781 7.09~|~04 - Reconstruction - No Added Capacity~|~34662E35F12C0C280FEC3DF3EA8E40589CC48CC2 98120~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.00 to 7.78~|~05 - 4R Maintenance - Resurfacing~|~99099D1F672D750399013C5D5C9E990621E2891F 125998~|~1~|~1~|~01/IMS~|~Split~|~05 - 4R Maintenance - Resurfacing~|~73E364B9BD36472D56F6139CBD4CE46F1C70DBAA 127271~|~1~|~1~|~01/IMS~|~ADD COEBELS TO ABUTMENT BEAM SEATS~|~13 - Bridge Rehabilitation~|~931DD0DEF309D755DE88B76C94EAAD2D9D960AB0 106156~|~1~|~1~|~01/NHS~|~Plan Split~|~~|~8CC589923CC74CA043E0B70A888B6D25916DBA13 77530~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D8624C96A8227C2261D095B744EC3AD601F99833 118649~|~1~|~1~|~01/STR~|~Rehabilitation of GUE-541-03.72 carrying SR 541 over Wills Creek~|~13 - Bridge Rehabilitation~|~DC881071C91B8603FE3E3CF835EA08139C5508CC 123189~|~1~|~1~|~01/IMS~|~Plan split for work associated with pavement maintenance~|~05 - 4R Maintenance - Resurfacing~|~BB43089FFC842FFD196A4CE39AC5AD43492A5C2B 110254~|~1~|~1~|~01/MPO~|~Resurface 3400? of Roadway, 310? of Roadway improvement and reconstruct existing traffic signal at E. David Rd. and Ackerman Blvd.~|~05 - 4R Maintenance - Resurfacing~|~BE3A64A68DB5023E033217A210AE3A07EF4C3959 118609~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~1A37D278BD8DFFE1022D7384ECBAE0100E4F7B33 116953~|~1~|~1~|~01/MPO~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4B61CC1584852F21872C3DEBA1334EF9BA90F41C 112567~|~1~|~1~|~01/MPO~|~Baumhart Road rehabilitation using NOACA funds~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A5AA5ED2CF3469A8BA56F2BE2886FFAD7002FA8C 122327~|~1~|~1~|~01/S>2~|~Plan split for deck replacement~|~13 - Bridge Rehabilitation~|~11A97DFC22596691E28A3606100E40974303F279 91721~|~1~|~2~|~02/STR~|~Two-lane resurfacing projece using an asphalt overlay treatment. GAL 233 0.00-7.88. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~8BBC1686EAB573CB92784F829C79545E86AF1D4E 88608~|~1~|~1~|~01/STR~|~Concrete deck overlay over Bell-Harraman Ditch SFN 5101530 - MAR 309-10.87~|~13 - Bridge Rehabilitation~|~621B6AC527DAF890CC98A6FB6D8768EB97E9A33A 125714~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~9F000413DC94D429C4D1E237C85D8B5EBF09C73A 83203~|~1~|~1~|~01/SAF~|~Improve geometrics~|~21 - Safety~|~20512E80FF0AD8FBF0DD0E7FFFBF8290E9B012D1 83203~|~1~|~2~|~02/SAF~|~Jobs and Commerce (4JC7) funding for change order work to improve turning radii for truck traffic.~|~21 - Safety~|~5BCD92CA59A801C5F23C0FD747C0B6068094F5F6 110416~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - No CAP - intersection improvement at LIC-40 and LIC-37.~|~21 - Safety~|~0EBDE92385D19B0A8CB0ED4C6FB8793031C2BB75 110416~|~2~|~4~|~04/STR~|~03/STR/BR " - No Cap - District Preservation 80% Federal (4PF7) and 20% State (4PS7) - deck sealing on LIC-40-12.33 and LIC-40-12.61~|~47 - Bridge Preventive Maintenance~|~8666AE65B1D148B51D079D6A340C35E9F25E5706 110416~|~1~|~2~|~02/SAF~|~"02/SAF/CV/ " - No Cap - 90% Federal (4HJ7) and 10% State (4BC7) - replacement of culvert at LIC-40-13.281 (CFN 1799740)~|~21 - Safety~|~D8FB7B26326F20D1911F0AD7CE41D0A8A99737D6 110416~|~2~|~3~|~03/STR~|~"02/STR/PV/ " - No CAP - 80% federal/20% state - resurfacing from SLM 9.27 to SLM 13.15.~|~05 - 4R Maintenance - Resurfacing~|~4CE58F023B46E1DDCE4381320776B5037C553650 110416~|~3~|~5~|~05/STR/HEBR~|~Installation of water line within project area. Work to be paid by village of Hebron.~|~~|~076E9AE27BD1D63763A9A0D87664220829EFFC9D 113018~|~1~|~1~|~01/NFP~|~All work on SR 294 from SR 37 (0.00) to the west corp limit of Harpster (8.94) using district preservation allocations. The project is on a Rural Minor Collector and therefore needs to use 100% state funds.~|~05 - 4R Maintenance - Resurfacing~|~732466365AB672E5EC80B5851B42CDD244A50527 102538~|~1~|~1~|~01/NHS~|~Replace decks on two bridges TUS 250 1504 L & R (SFNs 7904959 & 7904983). Replace approach slabs.~|~10 - Bridge Replacement~|~608D5D4BCE59BB4810288BE3CF986E283B9A2A5A 118618~|~1~|~1~|~01/SAE/PCEO~|~Replacement of pavement markings along various county routes in Perry County~|~21 - Safety~|~BBB78DC8E078D59BC6DA1DB5CB06DED7D23A3A0E 122816~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAD 4CD7). Construction phase cap is $998,238.00 and requires a 20% match (TRC)~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~04A3FB355BDAB6C3D453624937B7209DC570D015 124177~|~1~|~1~|~01/BRO~|~Bridge exchange funding split.~|~10 - Bridge Replacement~|~E64538428ACE41CE7017CABC38D4086D5B960DE5 112910~|~1~|~1~|~01/STR~|~JAC 279 0.00-11.45~|~05 - 4R Maintenance - Resurfacing~|~DD0B8707741EF230D6D844AE574F2D62F89DE24F 112910~|~1~|~2~|~02/STR~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~F5EFFA7E407838A7B913C1EA468630C296E13178 112910~|~1~|~3~|~03/NFP~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~D7E57A4D7169ACAE3D0D933D9072C56D9E6467FA 101211~|~1~|~1~|~01/NHS~|~SR 108 Resurfacing Urban from SLM 17.66 to SLM 18.72.~|~05 - 4R Maintenance - Resurfacing~|~24A40B6856580CBDE5F54D04B40D35FF952CE4B2 101211~|~1~|~2~|~02/STR~|~Resurface SR 108 STP Rural portion (Federal eligible, non-NHS) from SLM 18.72 to SLM 22.72 and SR-66 in Fulton County.~|~05 - 4R Maintenance - Resurfacing~|~E215AA54EAA550D6BCFE17058A2C86A0315F5C6E 116887~|~1~|~1~|~01/NHS~|~Overlay with repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4956E822330B2547F02950CADB61E6ADEF3A6360 111589~|~1~|~1~|~01/S>2~|~Replacement of the superstructure with prestressed concrete box beams with composite concrete deck. Also, minor substructure modifications/repairs, as well as related roadway adjustments and restoration.~|~13 - Bridge Rehabilitation~|~4C0280F48239B934B9FC9A3FE89F5ECCED73F3E4 92861~|~1~|~1~|~01/SAE~|~Pavement marking~|~21 - Safety~|~CCE4BC698E82ABBF958F7FD0A9CC7B291A3C87F9 96071~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " Plan Split for construction of a new Salt Storage Building at the proposed Quaker OP in Knox COunty.~|~44 - Other~|~65741E8EF60A2FE1005506397981DCAA75863ED7 125830~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~7D6CAEDA9619072AAF0392A67FE90EF1104BD14F 123527~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~45CE734B60C740C4EAB4B5CD5A1D28F7A975199E 99520~|~1~|~1~|~01/ENH~|~Purchase of bike kiosks and bicycles for installation at various locations within the City of Cincinnati. Installations will expand the City of Cincinnati's existing bike share system.~|~28 - Facilities for Pedestrians & Bicycles~|~83A3DBA72B0376E257D9B8E2FAF761FF1DDD556F 98038~|~1~|~1~|~01/NFP~|~Split~|~44 - Other~|~EC012307AFA3EBDB5917E2C6D81884F9690717A9 124939~|~1~|~1~|~01/S>2~|~Plan split for resurfacing Other Federal Aid Urban roadway~|~05 - 4R Maintenance - Resurfacing~|~EA3DF414DE58D58D0CABBE08A776430780443107 120669~|~1~|~1~|~01/SAF~|~Plan split for all work on project~|~21 - Safety~|~C4AF315DA8C7E29C1C2F9E444B16C1C147437011 120669~|~1~|~2~|~02/NFP~|~100% Locally funded plan split to relocate Village of Whitehouse water line~|~17 - Construction Engineering~|~F398484068DB66F2B660281E3D0C1B2C07C6F4D8 106198~|~1~|~1~|~01/NFP~|~D04 FY 2021 culvert repair/replacements.~|~~|~3005AFA45F0307F6D9B5A7C9D4A298FF9C7B3F93 104117~|~1~|~4~|~04/S<2~|~Urban Paving 80%Fed/20%State CRA-4-10.23 to 10.65 Right Side of Pavement~|~05 - 4R Maintenance - Resurfacing~|~B84F5E4D6E7C67DE3873956F3D90A855324781D5 104117~|~1~|~3~|~03/S<2~|~Urban Paving 100%City CRA-4-9.31 to 9.52 Full City Corp CRA-4-10.23 to 10.65 City Corp on the Left CRA-4-10.65 to 10.87 Full City Corp~|~05 - 4R Maintenance - Resurfacing~|~7CC6503742CCC53CCF1EA4D0B45139B716359F1C 104117~|~1~|~2~|~02/S<2~|~Urban Paving 80%Fed/20%CityCRA-4-9.31 to 9.52 Full City CorpCRA-4-10.23 to 10.65 City Corp on the LeftCRA-4-10.65 to 10.87 Full City Corp~|~05 - 4R Maintenance - Resurfacing~|~716B00F1930E7AEA013EC56043A03F4F2B1B5ECE 104117~|~1~|~1~|~01/S<2~|~Mill & fill, sidewalk & curb repair/replacement (SLM 9.52 to 10.23) using Small City Federal Funds and Toll Revenue Credit. Railroad is within this section.~|~05 - 4R Maintenance - Resurfacing~|~B215165C40167ED8782C72E8090D47E399BDBBC0 123705~|~1~|~1~|~01/STR~|~All Work is within this split~|~21 - Safety~|~2F25FEAE66DB17E4DAC90DF5F52F10EF5B08191A 126135~|~1~|~1~|~01/STR~|~Resurfacing on PRE-732 and repairs on the rural portion of PRE-122~|~05 - 4R Maintenance - Resurfacing~|~D4A8D875848B3F9DAF21E14C45635672ECDB70D9 126135~|~1~|~2~|~02/S5K~|~Repairs on the small urban section of PRE-122~|~05 - 4R Maintenance - Resurfacing~|~E2DFFC96BF3E7AA79DFEB202A8C4C8C07FDE30EF 115312~|~1~|~1~|~01/SAF~|~Split for recessed wet-reflective pavement markings~|~21 - Safety~|~1208026F81FDB9138336C208B4742D1C49B7637C 94476~|~1~|~1~|~01/IMS~|~To structurally pave the inverts of small culverts HAM-275-1954 and HAM-275-2487.~|~04 - Reconstruction - No Added Capacity~|~2BDF61C3D4C18D7344E6BD0E762B0DB32566DDF0 94079~|~1~|~2~|~02/STR~|~Bridge Maintenance on SFN 0402338 ATB SR 45 8.46 over Branch of Grand River and SFN 0402354 ATB SR 45 over Rock Creek~|~13 - Bridge Rehabilitation~|~AA9B1A83EDC936AEEFF61F0962C525FF0E9527FF 94079~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 45 1.87 to 11.06~|~05 - 4R Maintenance - Resurfacing~|~AF50C4277815AAD172B52B68B5386AEF22CC17A2 112972~|~1~|~3~|~03/STR~|~For costs associated with WAR-350 and CLE-749~|~04 - Reconstruction - No Added Capacity~|~B40E6646E5BDCA9184DC1C5A1356380CB865A322 112972~|~1~|~2~|~02/NHS~|~Repair bridge wingwall and retaining wall issues including the MSE wall west of the HAM-126-1501 R bridge at the EB exit ramp to US 42.~|~04 - Reconstruction - No Added Capacity~|~C21636E0A085B31F1DDA5BEFE11A5D2ABFBC3BED 112972~|~1~|~1~|~01/IMS~|~Repair bridge wingwall and retaining wall issues including the MSE wall at the HAM-75-0722 railroad bridge over I-75.~|~04 - Reconstruction - No Added Capacity~|~28F3E190453950178C9A07C979DE5F83EEB6B337 93075~|~1~|~1~|~01/SAF~|~Safety Work. All work in this split. 100% state funds. $72,000 in SAC 4BC7 funds from the Safety program. The remainder of the funds are SAC 4PS7 funds from the District Preservation Program funds. The District will be responisible for any overage.~|~21 - Safety~|~D2CC6BAF6ECDC5E8DC7FB7502E4448FECACA78FA 102493~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Crack sealing on various routes in D05 in FY 2022~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDB15716A0D11581D28214535278E9DA34D1F0F7 90536~|~1~|~1~|~01/S>2~|~Pavement Markings:CR 41 5.58 - 7.12CR 57 1.61 - 2.71~|~21 - Safety~|~02F96258DB2BFD17059463133C9C9CC55D385BCC 90536~|~1~|~2~|~02/NFA~|~Pavement Markings:CR 3 0.00 - 3.22CR 9 1.83 - 6.26CR 30 0.00 - 5.81CR 41 3.33 - 5.58CR 49 0.00 - 2.46CR 57 0.00 - 1.61~|~21 - Safety~|~B5D7E4C5EBBC7065FF562C5743231A47C0D8938B 80140~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~B3AC45A81B6E037BD8282600264773F85E12E0DA 116032~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - ~|~21 - Safety~|~F7E5D0B3EBD7D18DBF87635B1E82623D0EF33610 99562~|~1~|~1~|~01/NFA~|~Maintenance of the trai network throughout the City. Items may include: Signs, pavement repair, pavement markings and fencing.~|~28 - Facilities for Pedestrians & Bicycles~|~7B15BE4D132E39401FA57727987C89CDA872EEED 99598~|~1~|~1~|~01/NFP~|~District 11 guardrail reconstruction and repair.~|~21 - Safety~|~C152B349E61ACEEEB018D2E02D8E23C768F5E9CE 99598~|~1~|~3~|~03/NFA~|~Guardrail replacement on SR 524 in the Village of Bergholz.~|~21 - Safety~|~F1518699DFB8EC2959AD94D98B76643337C82199 99598~|~1~|~4~|~04/S<2~|~Guardrail replacement along SR 152 in the Village of Empire.~|~21 - Safety~|~BFC3CD3058DC8369A154EC6FC6690F5ED9C347AB 99598~|~1~|~2~|~02/STR~|~Guardrail replacement within village corporation limits of Bergholz (SR 164 only) and Mt. Pleasant funded by BHJ.~|~21 - Safety~|~29F0CCAAFD2664064A3E2EFBFBAF9939B24561F4 102001~|~1~|~1~|~01/NFP~|~District 4 one year mowing contract along interstate and interstate look-a-likes in Ashtabula, Mahoning and Trumbull Counties.~|~~|~AFCD734F2107525F22D3649948A3EEB74585AE19 90273~|~1~|~1~|~01/NHS~|~Reconfigure the US 35/Woodman interchange to a Tight Urban Diamond (TUDI). Project will also install sidewalk along Woodman Dr.~|~04 - Reconstruction - No Added Capacity~|~7378507C4EF41880359A0E55A49C4831BF8020A1 90273~|~1~|~2~|~02/NHS~|~Replace bridge decks.~|~13 - Bridge Rehabilitation~|~C5875E022EA49270086D8BC05DC8ED52BFC4F323 90273~|~1~|~3~|~03/NHS~|~Decorative lighting to be paid by the City of Riverside.~|~44 - Other~|~6BE36DA03F273C7A0EA91A5F7CBE97D47A7D1F8A 90273~|~1~|~4~|~04/NHS~|~Guardrail repair~|~21 - Safety~|~7D3C476E6E8603DA9DD4F3113DA57B36E9705049 104132~|~1~|~1~|~01/BRO~|~Split for work on the Whitehouse Crossing structure~|~10 - Bridge Replacement~|~0B0E5716B926EEC68A388F650018637F7915BC08 95662~|~1~|~1~|~01/NHS~|~Signals located at Wilmington Pike and I-675 NB and SB ramps.This is covered by D7.~|~21 - Safety~|~83750D53383661B7FA1EC612DEAD375B879D2D08 95662~|~1~|~2~|~02/S>2~|~Signal located at Wilmington Pike and SR 725.This is covered by D8.~|~21 - Safety~|~EE86FBA512AB9EDEFE3B3F440645A89FD0DB767B 95662~|~1~|~3~|~03/CMQ~|~CR 85 Wilmington Pike SLM 0.00 to 1.55 the project will provide upgraded communication between 11 traffic signals and will also rebuild or upgrade equipment at the individula intersections as needed to improve safety and operations. There are 9 locations in the City of Centerville.~|~21 - Safety~|~B80D8E4EFF07344704EC2487D6E1923C9A259235 97034~|~1~|~1~|~01/STR~|~Microsurfacing on State Routes 212 and 516 in Tuscarawas County.~|~05 - 4R Maintenance - Resurfacing~|~8DE8E12EE8E7972A789693C0710F6EE591E703F1 116477~|~1~|~1~|~01/STR~|~Chip Seal in Jackson County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8186FD817DB19E594A139350A91051B027C60691 112693~|~1~|~2~|~02/NFP~|~100% Local Items beyond 1.5" Pavement.~|~05 - 4R Maintenance - Resurfacing~|~D9E1F7B465C80F205100BB0EA6BCFAEC41D05ECE 112693~|~1~|~1~|~01/NHS~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items): Limited to the top 1.5" of Pavement. ~|~05 - 4R Maintenance - Resurfacing~|~7AF40CCABEB487871A728471CDE58C46FB063F5D 112499~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~435BCEEEB860034C1EC207BACB5EEE16D632801C 105302~|~1~|~1~|~01/NHS~|~Resurfacing and concrete repairs on JEF-22 from the HAS Co. Line to SLM 6.98~|~05 - 4R Maintenance - Resurfacing~|~A1802163A676C4009B0CAFF956BBEE220064430D 116671~|~1~|~1~|~01/STR~|~This split is for the portion of US68 that is outside the Kenton Urban area. ~|~05 - 4R Maintenance - Resurfacing~|~469BF8BBC770D18C46E52D3513272C60354198A7 116671~|~1~|~2~|~02/S5K~|~Resurfacing inside the Kenton Urban Area but outside of the City of Kenton. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~2ED239FC7B1EBD0BCC38F98B83216F647E5ADD56 125214~|~1~|~1~|~01/S5K~|~Resurfacing, drainage, curb improvements, and other misc. roadway items along Jaycee Dr. and Trenton Ave (4B97 Small City Program to provide 95% of the eligible costs, up to a max of $1,553,900)~|~05 - 4R Maintenance - Resurfacing~|~E2615DA037C389D54701593D9688FE5169FB28BD 121052~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 10.90. ~|~~|~9E81B39E328ECEC8A3B0615579F2F03DB9D1E11D 116572~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~~|~9B1AE5030063B772168FD823506F31C50E92636E 83217~|~1~|~1~|~01/CMQ~|~MORPC CMAQ project Intersection improvement project of DEL-CR124/Home Road with SR-257 and with S Section Line RoadLocal sponsor - DEL County Engineer~|~04 - Reconstruction - No Added Capacity~|~951DDDDECD7DB7AE6946BF85A8042B75D1B4519A 117934~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-G 159-162~|~44 - Other~|~AF46E6C51B9EE1E99DB52B039F969BE94204AABB 85600~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~F1DA66CD28E4769AD92D215717FEE667D4D181C0 108132~|~1~|~1~|~01/MPO~|~Resurfacing of S Hawkings St from East Ave to Mull Ave in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~2CA523FA27286639BD3DE0CF7500E2FD7C7E726A 99674~|~1~|~1~|~01/STR~|~This plan split is for the rural portion of the route.~|~05 - 4R Maintenance - Resurfacing~|~DBE62E7A6C0F316FA3DF0B5FD49A084DF06D9472 99674~|~1~|~2~|~02/S<2~|~This plan split is for the large urban portion of the route.~|~05 - 4R Maintenance - Resurfacing~|~B5F7011BB45F487B3BBF0D1B2E40CFB42BCB7A63 99674~|~1~|~3~|~03/S>2~|~This plan split is for the small urban portion of the route.~|~05 - 4R Maintenance - Resurfacing~|~7FDFEED104AB8657A147EEB07415F3F7B6257D3B 122292~|~1~|~1~|~01/IMS~|~Plan Split for the steel repairs to bridges~|~~|~70811237F2BA41FCAA9C181F44F30F88AFD260A1 92158~|~1~|~1~|~01/BRF~|~4860969 LUC M0889 NO DATAIntersect: NORFOLK SOUTHERN RR~|~10 - Bridge Replacement~|~A0167675CB99371CE71AAFC83E4340AD9EBE6445 92158~|~1~|~2~|~02/NFA~|~100% City or ATAT conduit items~|~10 - Bridge Replacement~|~9F05017F0FA3FD7EE50366C014FC4FD88387D99E 123019~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4.~|~21 - Safety~|~7D1FF5620D60D7C664D73E5C3C0240947FFCF914 88611~|~1~|~1~|~01/BRO~|~Deck replacement (BR eligible):SFN 2508850, FRA-104-9.69, Groveport Rd~|~13 - Bridge Rehabilitation~|~AB63E6E64288B5B562A221ECE1FA846917EAA624 119489~|~1~|~1~|~01/BRO~|~Plan split for CEAO LBR fund eligible work to replace the bridge SFN 4345908.~|~~|~20DFDD3493F16AE4D59831FA56570FB03E5038CF 95458~|~1~|~2~|~02/S<2~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Fai-US 22- 18.05 to 18.67~|~05 - 4R Maintenance - Resurfacing~|~E2C385731252784C1BF0DD8EE904384DDB94B8BA 95458~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1). Fai- US 22- 18.67 to 26.07 2). Per-US 22-0.00 to 6.77 3). Per-SR 13- 26.88 to 28.15~|~05 - 4R Maintenance - Resurfacing~|~7377282FF67AE2212E8D8D5E23B4DFD4D85ABAE1 121986~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~E7CC924D21BFD3F5E116099572D5899F0AD4F00D 89155~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge Project~|~13 - Bridge Rehabilitation~|~F2D3B698EBDC96637B9521D25B638D975C02B8EE 123771~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~0A8D25DC7B8F804BAD60966C40A6B0ADE7762A1C 102849~|~1~|~1~|~01/NFA~|~BRO 221 Scour Project.BRO 221 3.90 (SFN 0802883)BRO 221 5.72 (SFN 0802948)BRO 221 5.88 (SFN 0802972)~|~47 - Bridge Preventive Maintenance~|~01E52544CBBDE444CDB504CAC6E23D3745F51237 99070~|~1~|~1~|~01/S>2~|~Apply herbicides along roadside for week control on 4 lane roads - MOT/CLA IR 70/75/675 - US 40/68 - SR 4~|~44 - Other~|~C4D0856EE1E864726E752010C54EA4AF6ACB3EA9 110591~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~268F7EEBAAAC20B40656099ED9341E12AED7BAB8 110591~|~1~|~2~|~02/NFA~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~3B0CED251213A3A86D60CF0EA57BA3BC256A8BA5 115128~|~1~|~1~|~01/STR~|~Landslide repair(s) by drilled shaft retaining walls.~|~~|~2C685214366820BD582E2E83D50F3F6AB9DFF9AF 98783~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR74 E1.77, SFN 5832152. Includes minor approach work. Funded 100% federal (with 20% TRC) through the OBPP.~|~10 - Bridge Replacement~|~EF2037395F5A8C153430291B194D9A0D45FAEC2E 93989~|~1~|~1~|~01/BRF~|~Johnson Road Covered Bridge On Johnson Road, TR291, approximately 1 mile north of the Scioto County line, the Johnson Road Covered Bridge carries Johnson Road over the Brushy Fork of the Little Scioto River near Petersburg in southwestern Scioto Township. Built in 1870, it is listed on the National Register of Historic Places. It is proposed to rehabilitate & repair structural components, replace deteriorated timber members, & install fire protection to keep bridge in good repair and to allow it to continue to carry vehicular traffic. 80% FHWA Discretionary Grant Program20% local match01/BRF/BR/Jackson County~|~32 - Historic Preservation~|~AB4200B7E4435C998EA3AC6A1409CEDB5B5350B4 96722~|~1~|~1~|~01/NFA~|~Trumbull Gustavus Outpost, build new 40'x200' (8,000 sq ft) pole building with 10 bay cold storage~|~~|~BAEE41078CE0583A3BF55848A7F66BE42CCF6AB8 91921~|~1~|~1~|~01/S>2~|~Rehabilitate Bridge GRE-835-0207 (SFN 2904519) by placing a rigid overlay, replacing the deck edges, installing abutment supports, and perfroming other minor rehabilitation items.~|~13 - Bridge Rehabilitation~|~A732E0D8684E0E1B2177BDB6228500BFE1B2B3EC 110076~|~1~|~1~|~01/STR~|~Replace/repair culverts on rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1E68BC870014BBCA12708BAF8E740F5DF4B1D423 110076~|~1~|~2~|~02/NHS~|~Repair/replace culvert on NHS route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B2B81F3067180DD998A6C9531A97C663B31964E 100326~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint.~|~21 - Safety~|~17A53AC4A927289925E64B17DC488AD60563ABF6 95962~|~1~|~1~|~01/NFP~|~New 60' x 150' fabric salt building at 6000 tons. Demolish one dome.~|~44 - Other~|~02D1575AA6976F59CD0CB9DCE0F99B70B5104DF8 95962~|~1~|~2~|~02/NFP~|~Build new 5000 square feet equipment storage building. Demolish lean-to.~|~44 - Other~|~54139F07F67624D39F08AE84365923DAB02F5E9A 86942~|~1~|~1~|~01/STR~|~Rural Plan Split for ATB SR 45 24.10 to 26.43~|~05 - 4R Maintenance - Resurfacing~|~99C2E1158ACCE11F795DA3E86322D1696A1F7C2C 86942~|~1~|~2~|~02/STR~|~Bridge Plan Split for SFN 0402680 ATB SR 45 25.15 over Red Brook and SFN 0402710 ATB SR 45 25.30 over West Branch of Red Brook~|~05 - 4R Maintenance - Resurfacing~|~FB40E54B8AB3C811B0DA7D565375297112BEBFCE 113794~|~1~|~1~|~01/BRF~|~"01/BRF/BR/KCEO" - replacement of structure KNO TR 124 0.10, SFN 4236459 using federal/state exchange program.~|~10 - Bridge Replacement~|~308ED8FB569405C94F16EAAFB0E4AC292E7E7DBF 123115~|~1~|~1~|~01/NHS~|~Resurfacing US 33~|~05 - 4R Maintenance - Resurfacing~|~FC5C710E2FBD9D71D0D82FB9D91014F4D17011A3 82797~|~1~|~1~|~01/CMQ~|~80/20 fed/local funding split for all work using MPO CMAQ funds.~|~44 - Other~|~2D384AD7C8B1A95ADE9325CD95E949FFA8DFCA76 82797~|~1~|~2~|~02/CMQ~|~100% local participation for work items that are not federal-aid eligible.~|~44 - Other~|~ACA438ACA8A891F594AB0D8B507A2BBB7C012FE3 87039~|~1~|~1~|~01/IMS~|~Systematic sign upgrades on Interstate Route.~|~21 - Safety~|~AA15BDE72562B02325A5FE018B60DD137B2E206E 87039~|~1~|~2~|~02/NHS~|~Systematic sign upgrade on NHS route.~|~21 - Safety~|~96F2320F5FFA2F99EB5927E2EE5E667784C6C892 87039~|~1~|~3~|~03/STR~|~Systematic sign upgrade on Rural Routes~|~21 - Safety~|~3846F8DF9656528AF68F0186C70AC098E18E0E4D 87039~|~1~|~4~|~04/S>2~|~Systematic sign upgrade on urban routes.~|~21 - Safety~|~F02563A32D0E15B72958BF0EB37DA9C06B50D7FC 127219~|~1~|~1~|~01/IMS~|~Add new through lane eastbound.~|~03 - Reconstruction - Added Capacity~|~383CAE38C54FFD5DF7A25C6BE8351A86B36E895A 105294~|~1~|~1~|~01/IMS~|~Resurfacing of IR-77~|~05 - 4R Maintenance - Resurfacing~|~285AD4B71FC2D1B4864106D5ABCB6F31BB870759 115992~|~1~|~1~|~01/STR~|~Plan split for slope repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB6753F43BF4C9E07B2E0C72448F82D1EBE65B70 106455~|~1~|~1~|~01/NFP~|~Construction engineering and testing tasks not attributable to a specific PID~|~17 - Construction Engineering~|~7ABB38C4DA0FDF6A20D4D088F440D1753DDF5369 91905~|~1~|~1~|~01/IMS~|~Crack sealing at various locations on DEL IR 71 and MRW IR 71~|~05 - 4R Maintenance - Resurfacing~|~03F69ECD71E8C85CF923FBCA85606451CF0F621A 104420~|~1~|~1~|~01/NFP~|~Old Sandusky garage clean up~|~44 - Other~|~91D2B5BB37EBF558FEC7C1E17158331E05F5441F 95108~|~1~|~1~|~01/CMQ~|~80% federal / 20% local participation using MPO CMAQ funds for the upgrading/replacement of the signals along Lorain Avenue in the City of North Olmsted.~|~21 - Safety~|~FDEAEB0E912D2BB1A3462044406A1DA2BBB0C53E 95108~|~1~|~2~|~02/NFP~|~100% local participation especially fro work items not eligible for federal funding~|~21 - Safety~|~9F54B8B18E863D4A482F03248E472EC10591AAFD 108715~|~1~|~1~|~01/STR~|~Drainage repair, ER Event# OH18-01, DDIR# BEL-010~|~~|~AD623A83669C38135BA9ACAAE63F8FCD45EE24EA 105924~|~1~|~1~|~01/SAF/LCEO~|~Licking County Engineer HSIP Funding - 4HB7 (100% Federal) - See CAP Comment - Project to renew striping on various county roads in Licking County.~|~21 - Safety~|~0608CE07F5E8ED8DC0A3D9EE55FB5920E5BE37A5 97891~|~1~|~1~|~01/SAF~|~100% for replacement of a faild culvert (Emergency Request Type A)~|~21 - Safety~|~5A3912F14630C339635FC5DA6758CF1A91490C16 102764~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~DEB74781118219B98CDC29B351DAA72E34C741D4 95582~|~1~|~1~|~01/STR~|~Bridge Rehabilitation - WAY-241-06.88 (SFN 8504652)Minor Rehabilitation?Approach slab repl/repair (100)?Approach railing repair (102)New Construction?Structure(repl) (002)?Structure widening (005)~|~13 - Bridge Rehabilitation~|~C29E7B491D5B425B97397B30D12DE4C4E55A3337 116299~|~1~|~1~|~01/STR~|~Overlay project.~|~05 - 4R Maintenance - Resurfacing~|~B84BA4779AF402BFE2A59D75383365CE81E17C8F 115694~|~1~|~1~|~01/STR~|~Rural STP split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~5163FB346F26A1B262D806324B75C1DDFE0CFB0A 106983~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - City of Zanesville resurfacing project using 4TA7 funds for CR 71 from 10.63 to 11.66.~|~05 - 4R Maintenance - Resurfacing~|~95FC7709D7EEC6F2DDDCE7894F61C9C018B0D389 123629~|~1~|~1~|~01/NHS~|~Funding Split for NHS~|~05 - 4R Maintenance - Resurfacing~|~C001EC1FD38BB521FCA7DB67468DBE1C9F587DD0 113739~|~1~|~1~|~01/SAF~|~The repair of sidewalk and ADA ramps in sections along Wyoming Ave and Mill St. Install flashing beacons, and restripe pedestrian crossing at Anna St and Wyoming Ave. Install audible pedestrian signals at existing crossing signals at Wayne Ave and Wyoming Ave. Paint high visibility cross walk at Forrer St and Wyoming Ave. Paint school zone and high visibility crossing on N. Cooper Ave and add flashing beacons at crossing, and LED advanced warning school zone signs. Paint school zone on Forrer St and add LED advanced warning school zone signs. Paint high visibility crossing at the intersection of Wyoming Ave and Mill street. Update ADA ramps at this intersection.~|~28 - Facilities for Pedestrians & Bicycles~|~EFDDAFA6E9F3DA202759725DA185BE547D26D40C 78791~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Tower Lighting Replacement: 1) Gue-IR 70-09.10 to 09.61; 2) Gue-IR 77-07.08 to 07.59;~|~21 - Safety~|~7FA7F92351B8AA0B83959B360A205CEB6F9D09F1 125708~|~1~|~2~|~02/S5K~|~Piling Encasement ATH SR 13-2.709mm~|~13 - Bridge Rehabilitation~|~6DF991D21B55D3BFF9FE54345F31C152603FC132 125708~|~1~|~1~|~01/STR~|~ATH-13-15.88 Pile Encasement~|~13 - Bridge Rehabilitation~|~C19D2379059FA3C027C3800454BD7530BD53DFDB 110910~|~1~|~1~|~01/SAF~|~Construction of sidewalk on Sussex Avenue from Corbly Street to Coffey Street and on Coffey Street from Sussex Avenue to Kenlee Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~055685C675595AD38E5EC2364A1817AF792B5BCC 103479~|~1~|~1~|~01/STR~|~Landslide repair. MEG 124 63.42. DSR MEG-005.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~546CC74FD61B61F21AFF1E6B0E259BC1925642EA 82890~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 260 3.75-14.33. Not on any federal aide system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~836DB161AE81D37213E052958755DD33497B3531 100340~|~1~|~3~|~03/S<2~|~MicrosurfacingMER SR 29 SLM 15.53 - 15.79~|~05 - 4R Maintenance - Resurfacing~|~C520A586FF5AF69DEA65E0054EE6C2D7AD37BBE5 100340~|~1~|~2~|~02/STR~|~MicrosurfacingAUG SR 29 SLM 0.00 - 2.13MER SR 29 SLM 15.79 - 18.30MER SR 29 SLM 18.30 - 18.80~|~05 - 4R Maintenance - Resurfacing~|~16CE0E1CD35754586E24CD844188D6A9432ECBF2 100340~|~1~|~1~|~01/NHS~|~MicrosurfacingMER SR 29 SLM 13.22 - 15.53~|~05 - 4R Maintenance - Resurfacing~|~241F089464EB31FF3B88C1EC94B1753708984430 77931~|~1~|~3~|~03/S>2~|~STP Urban funding associated with Bridges GRE-42-0790L/R (SFN 2900815 and 29000823).~|~13 - Bridge Rehabilitation~|~1F58551135765D05E228BE70781686BB7917DF31 77931~|~1~|~2~|~02/S>2~|~STP Urban for pavement on on US42 between SLM 6.79 to 8.02; and on SR 725 between SLM 2.46 to 2.95.~|~05 - 4R Maintenance - Resurfacing~|~360AC9DCBA4E9A4857A9FBFC0E5979DBB1358F1D 77931~|~1~|~4~|~04/STR~|~STP Rural funding for Bridge GRE-725-0624 over Glady Run (SFN 2902915).~|~13 - Bridge Rehabilitation~|~CEE3D97C428F4BB1069432A2310DE0AA53866A5D 77931~|~1~|~1~|~01/STR~|~STP Rural for pavement on on US42 between SLM 1.99 to 6.79; and on SR 725 between SLM 2.95 to 7.39.~|~05 - 4R Maintenance - Resurfacing~|~FE2132CC5BA26B54C6EAAB1AF10FD53760422E59 121435~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~B17A78F0A710275D10F65F76B6C3A90B00F8E92E 123406~|~1~|~1~|~01/SAF~|~Convert existing intersection (i.e. traffic circle) into a roundabout to improve traffic flow and safety utilizing Carbon Reduction (4CU7) Federal funds at 95% up to CAP.~|~21 - Safety~|~40B8849FDCD5382089FBC73097392FF11CAC2388 115117~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 218 9.28 (CFN 1819494).~|~04 - Reconstruction - No Added Capacity~|~5F916383B1CAC634FFB2B1E5D66248E37995BD51 109863~|~1~|~1~|~01/NHS~|~JAC Smoothseal FY25~|~05 - 4R Maintenance - Resurfacing~|~D41B9901BEE63CE9A1945952C05324A5DCC21F64 103910~|~1~|~1~|~01/SAF~|~Reconstruction of Antioch Road (CR-12) from the Highland County line to approx. 250 feet north of Moore Road including improvements to the horizontal and vertical alignment of the roadway, widening of lanes and shoulders, and new pavement markings, RPMs, and signage.~|~21 - Safety~|~69485014177C48FB99A91B5525C0929965913C9A 112880~|~1~|~1~|~01/IMS~|~MAD-70 from 0.00 to 8.96~|~05 - 4R Maintenance - Resurfacing~|~AE0F2C6FCC3BBB4D1FDEDA300F92134302C9591F 107073~|~1~|~1~|~01/NFA~|~HIG CR VAR GR~|~21 - Safety~|~E47DE6283CBD4FC3CE806B8588AB3BC0514CB99B 108324~|~1~|~1~|~01/NFA~|~The Port will construct a new 1325' public road starting from Commerce Pkwy and heading in a northerly direction.~|~01 - New Construction~|~2E2CD97017F6FBDAB3F5195F3A9DA67D6417FC58 111819~|~1~|~2~|~02/SAF~|~Construction of turn lanes on CR33/TR33 (Carters' Corner/Domigan Road).~|~21 - Safety~|~5567EEC3B1C00DCBFCB8977EE4AE9D5F8E30F7BF 111819~|~1~|~1~|~01/SAF~|~Construction of turn lanes on US36/SR37.~|~21 - Safety~|~DB8EE899222934F479CC800A3C9F45FED97532E6 91900~|~1~|~5~|~05/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~2EDBE9CFB43C0C58CF58FF1B452CCA3CE16239AF 91900~|~1~|~7~|~07/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~9F1784EFA12CAA959ED3A8E92DCA13BAEECA3D95 91900~|~1~|~6~|~06/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~530D376FEC5080165534E3DA1968ADA094D1829C 91900~|~1~|~8~|~08/S>2/WARR~|~Guardrail and catch basin repairs in the City of Warren.~|~04 - Reconstruction - No Added Capacity~|~ED5F505214884F3753AA8102A1D50C19193B4531 91900~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~442054885977C80F37E455EF542E479FF1D9D727 91900~|~1~|~3~|~03/S>2/YOUN~|~Resurfacing, urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~D73D804D48A96D8C51EDF8587FDFAC1012E25D82 91900~|~1~|~2~|~02/NHS/YOUN~|~Resurfacing, urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~3323F060FB3C9413C30C6FD9367A530AA15EBCE8 91900~|~1~|~4~|~04/S>2/WARR~|~Resurfacing, urban paving in the City of Warren.~|~05 - 4R Maintenance - Resurfacing~|~8E05C2F51F2C6C90E1481B3560EB9B381C839955 91900~|~1~|~9~|~09/NFA~|~Retroactive fuel price adjustment~|~~|~B0D666C50A14964FC0FB2E8DF2414BB786203AE2 85031~|~1~|~1~|~01/BRF~|~Brdg ReplacementBridge at 0.42 on CR 50 section over Rattlesnake Creek in Brown County Replace Bridge and abutments at 0.42 section on CR 50 over Rattlesnake Creek. Per CEAO letter, dated 8/28/08, federal max on project is $453,600. 0833142 BRO CR50 0.42 Intersect: Rattlesnake CreekNon FA, BR Eligible80% Fed/20% local match Brown County01/BRF/BR/BRO~|~10 - Bridge Replacement~|~2903F5A6454CEEB76F9563BF9014B95C6BD4758B 83525~|~1~|~1~|~01/STR~|~Plan Split for Bridge on Rural System SFN 7605765 STA SR 183 2351 over Deer Creek~|~~|~45ED424E4D2E559A470DF445A45FC8F845138900 113725~|~1~|~1~|~01/SAF~|~Construct a shared use path on the west side of the road in Liberty Township.~|~21 - Safety~|~0F36D10CC6368DB5D3DF0AF84B765B07BF869EB6 89288~|~1~|~1~|~01/NFA~|~Resurfacing within roadway segments not along federal aid system~|~05 - 4R Maintenance - Resurfacing~|~F3A6A5674A19D8FBAC4216664DBE5CB3E49901E5 89288~|~1~|~2~|~02/STR~|~Resurfacing along STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~5602D861509860E0F30DD40ECBE540D8FCDD3937 122876~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~C36A1E390CA32EA5C82B21A591E62BE9EA1E6BF7 120166~|~1~|~1~|~01/NHS~|~Turn lane installation along eastbound off-ramp at 33/188~|~21 - Safety~|~AC6B772DF9297117BFF85D7CE0343D6144A3E493 78399~|~1~|~1~|~01/BRO~|~SFN# 0460036 ATB-West Avenue over Conrail RR. SFN# 0460028 ATB-West Avenue over West 30th Street.~|~13 - Bridge Rehabilitation~|~5AFE50DF31A2C24E02F2FA3F6C939A5D6F2F2844 100787~|~1~|~1~|~01/NFP~|~Various routes.~|~05 - 4R Maintenance - Resurfacing~|~0BA431CCE59D92CADAAC0E54D8D390CA685DED26 97354~|~1~|~1~|~01/NFP~|~Split~|~01 - New Construction~|~D634A3D5EAE9000734E5C577798E9F271D091A6D 124745~|~1~|~1~|~01/STR~|~Bridge Replacement For HOC SR 595-4.12 (FSN 3704297)~|~10 - Bridge Replacement~|~849C14BA20071E9EC93F01B99F6E3409C520FCE0 91495~|~1~|~1~|~01/SAE~|~Widen SR-747 to provide a second SB through lane for 500' at the intersection of Princeton Road~|~21 - Safety~|~9159420F3CC83BEB162458D661544465D5DE5430 113686~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~5D34F77759FB56EFCB7FEF9D54999448E82036C0 109481~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~61977B7B38683BAE8775FBB8F0D6CBD5713979AC 90882~|~1~|~1~|~01/STR~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~6692A3DC50ADDCEE725F29B0BA85002EE52C7B50 93681~|~1~|~1~|~01/STR~|~Replace 2 culvert s on SR-295 in Lucas County @ SLM 5.31 & 5.44. NO SFN assigned.~|~~|~BB1D913B919774BB2BC0706E2FEA10FBB7FF8BE2 124212~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing State Funds via the Fed/State Exchange Program at 80% up to CAP.~|~10 - Bridge Replacement~|~5B6B9C37D25A8A22CF6BD96D58109543001595B9 92223~|~1~|~2~|~02/STR~|~Plan split for conduit work incidental to slide repair~|~04 - Reconstruction - No Added Capacity~|~50BE7F3CB02701F0603FF9D93C8BB7DB57C5383D 92223~|~1~|~1~|~01/STR~|~90/10 funding split using federal GSM funds, per direction for Resiliency Improvement Plan ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B038B0F881AA714A0EF5D8497B71CBB349D3BD05 96307~|~1~|~1~|~01/STR~|~It is proposed, on SR279, 0.4 mile east of McCoy Rd. (TR318), to replace the structure (SFN 4003055, SLM 4.06).~|~10 - Bridge Replacement~|~DDF431E97258BD468BFC36B3ABB7F9AED4C70BFE 120038~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~4E1F793E0A36C5CF57F472788DE46FEF0704A974 83081~|~1~|~2~|~02/NHS~|~PIK US23Brdgs F/Rehab:6600212 PIK US23 5.85 Intersect: Private Road6600239 PIK CR117 6.2 Intersect: Grove Road (Old Sr 32)6600263 PIK US23 6.4 Intersect: State Route 326600298 PIK CR117 6.2 Intersect: Grove Road(Old St Rt 326600328 PIK US23 8.37 Intersect: Scioto River6600344 PIK US23 6.4 Intersect: State Route 326600352 PIK US23 8.37 Intersect: Scioto River6600360 PIK US23 9.77 Intersect: Scioto River Overflow6600425 PIK US23 10.34 Intersect: Pee Pee Creek & Flood Pl.6600514 PIK US23 10.87 Intersect: Scioto River Overflow80/20 spllit~|~13 - Bridge Rehabilitation~|~4BB9A9C43DC87868F01F17E8C04AC7BD96588851 83081~|~1~|~1~|~01/NHS~|~PIK US23 5.25 - 11.56 Resurfacing projectOn US23, begin project 5. 25 miles north of the Scioto County Line (SLM 5.25) and end 0.06 mile south of Waverly Corp. limit (SLM 11.56), it is proposed to resurface the highway with asphalt concrete. 80/20 spllit~|~05 - 4R Maintenance - Resurfacing~|~9FFF73ECE035C5138F47980317F2DB16EDB381C9 102801~|~1~|~1~|~01/STR~|~Ful 66 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4E25C9C023F97758CC105BFD99E820CE8862C445 102801~|~1~|~2~|~02/STR~|~Full 66 Bridges~|~13 - Bridge Rehabilitation~|~A87C0FF3C1F6C88EB1E7BE3FB3F47F37E2D824DE 100529~|~1~|~1~|~01/NFP~|~D09 Bridge Strip Seal Various Locations.~|~04 - Reconstruction - No Added Capacity~|~3644EBE123C117CDD6F1859C06B532E2DB8E0C1D 104941~|~1~|~1~|~01/MPO~|~Work eligible for CMAQ funding in the construction of the multi-use trail~|~28 - Facilities for Pedestrians & Bicycles~|~7632584EAF3DC190AF32979D8EB5A070E8C4EFF0 113163~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~B683E318B46A4B561609A670DDA967A9C7FCDFA9 113163~|~1~|~4~|~04/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~2361B4CE6750944A27CF19D4585542C75CD15693 113163~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~3794768F76D57B3C12D46034A5C7296C816469DB 113163~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~6CD2799E597A8BC6D6B29B3C676AABFB7AAB94AF 113163~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance 10' to 20' structures.~|~04 - Reconstruction - No Added Capacity~|~EFF2E8B6E67995CC1A386B8A663B485E4A3512D9 113163~|~1~|~6~|~06/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~9AE3924D225D78923C6BDCC7A50FA75AAA55622E 113163~|~1~|~7~|~07/NHS~|~Noise wall repairs SUM-IR 77-16.73 NB.~|~20 - Environmental Only~|~B00EF0DDB5F41749A12CB7D4989777158F73AD8D 100159~|~1~|~1~|~01/MPO~|~80% federal w/20% local matching funds for project eligible work items.~|~05 - 4R Maintenance - Resurfacing~|~ED2860FEC09B6332B367FEC0B1DA3CDB422FACE0 100159~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding.~|~05 - 4R Maintenance - Resurfacing~|~CB58C5107FBCD4F4D4DF4E0755E65276B34718C9 116691~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~6E716D23D046FD6E3A19D5AC8B6483BC1D9C481E 116691~|~1~|~2~|~02/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~14B6505ACFFD111FA3DA3E36D535FAA18C015C9C 113151~|~1~|~1~|~01/MPO~|~Split for MPO funded work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D9644705D81F9B4B9EA271F10361CAED7F314ADE 125715~|~1~|~1~|~01/IMS~|~Bridge Maintenance activities in district 6~|~47 - Bridge Preventive Maintenance~|~E120077624FC279AFAA02880880B30C39A3D86CB 23414~|~1~|~3~|~03/BRO~|~Split for 100% local work on CEI ducts~|~13 - Bridge Rehabilitation~|~23FAF059315F026E432EC6BEBAD0E1B87B258372 23414~|~1~|~4~|~04/BRO~|~Split for 100% local work on the Dominion gas line.~|~13 - Bridge Rehabilitation~|~B61AF1D328499BEC3FA64CEBE93E71CAF0D9D60A 23414~|~1~|~2~|~02/BRO~|~Split for 100% local work on AT&T.~|~13 - Bridge Rehabilitation~|~C440063283C948F30A090A8609984B8FD8814B7F 23414~|~1~|~1~|~01/BRO~|~90/10 fed/state funding split for all work using federal BHF funds. 1807889; CUY-042-1662~|~13 - Bridge Rehabilitation~|~4414246D0817C0EDC67737217903ED6E2C348CC6 118151~|~1~|~1~|~01/S50~|~Landslide repair by drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B337F34C5D8C5B470C04F767A324A3C715F70101 106816~|~1~|~1~|~01/NFA~|~The City will remove a cul-de-sac at the end of Flagship Drive and relocate existing utilities.~|~01 - New Construction~|~261C0DFCF3A35F5CBB744DD029C56F09ED35869E 113738~|~1~|~1~|~01/SAF~|~Install sidewalks on each side of Van Hook Avenue from Hoadley Avenue to Hayes Avenue. Improved road crossings along route by replacing ramps with ADA compliant ramps, and adding pavement markings, signs and rectangular rapid flashing beacon. Curb will be added and storm structures and drive aprons modified where necessary to accommodate sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~4F798BD15143B27BA8F06FDAF53C98537945630C 103817~|~1~|~1~|~01/STR~|~Bridge repair on rural route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8A883A6F4A9147E098A03A6F15D4BAE7D6234ED4 102871~|~1~|~1~|~01/NHS~|~Reconstruct/resurface West State Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1065726EA11A03C045CE5CD51DEC692D999F6442 101452~|~1~|~1~|~01/STR~|~DSR# COL-006~|~04 - Reconstruction - No Added Capacity~|~DA48A1720528E1FEA9B3AB605B44F283B5A61FA4 122025~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~2DFF239808EB9260113CEB547D800843F142B18D 84611~|~1~|~2~|~02/S>2~|~Resurfacing on the Urban portion of GRE-42 within the project limits. The section is between SLM 11.26 to 12.02~|~05 - 4R Maintenance - Resurfacing~|~B60D6E72A8D36988D80398A034702CF6763CEB30 84611~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of GRE-42 within the project limits. The section is between SLM 12.02 to 17.91~|~05 - 4R Maintenance - Resurfacing~|~BE62F3B42147C8E47CF43E87CEEECF6119555EC1 104641~|~1~|~1~|~01/MPO~|~Resurfacing Tibbetts Wick Road (CR-28) between SR 11 and SR 193 in Liberty Township.~|~05 - 4R Maintenance - Resurfacing~|~F5C0856326E6FA369E20E2C53158B310BC8A6429 94144~|~1~|~2~|~02/BRF~|~Part #2 for non-eligible IBRD items added.~|~10 - Bridge Replacement~|~792AA52FA6B7265B0B8D53A3C90E0B73936A232D 94144~|~1~|~1~|~01/BRF~|~Part #1 Split added for IBRD Construction funding. Eligible items are limited to additional costs for beam modifications and UHPC material.~|~17 - Construction Engineering~|~9209EC619B50CC799F04A4A788502085EAB0221F 89122~|~1~|~1~|~01/SAF~|~Pippin Road: from Galbraith Road to immediately south of the southern intersection of Compton Road. Project includes pavement repair, addition of a two way left turn lane from Galbraith Road to the bridge over Cross County Highway (SR-126), repairs to Bridge No. HAM-CR 90-0186 (over an unnamed tributary to the Mill Creek), construction of a retaining wall on the west side of Pippin Road, south of Compton Road, and possible curve realignment. Sponsor - Hamilton County~|~21 - Safety~|~ADAEAA8111400FB22631C4ABD26A2A319E6625B0 109934~|~1~|~1~|~01/S<2/HBRN~|~Resurfacing of CR 79 and MR 214E through the village of Hebron.~|~05 - 4R Maintenance - Resurfacing~|~3AF6CF02E88FFF006F75DECCC57F77AB7E7A32A3 109934~|~1~|~2~|~02/CMQ/HBRN~|~Traffic signal replacement at US 40 and CR 79.~|~21 - Safety~|~283ED3934B3D0CE725777D2A1258A0C45C22E1AA 101683~|~1~|~1~|~01/ENH~|~01/ENH/OT/DENN - TAP eligible work at 80% federal/20% local.~|~28 - Facilities for Pedestrians & Bicycles~|~5A5377598227F017A3C4B59C1493F04D13F4F36F 101683~|~1~|~2~|~02/ENH~|~02/ENH/OT/DENN - 100% Local items of work.~|~28 - Facilities for Pedestrians & Bicycles~|~B629053309B5F36107A28D9C6B6988A3369708C0 104498~|~1~|~1~|~01/MPO~|~plan split~|~17 - Construction Engineering~|~4B2537124D192751B25FF31F240B93C642499C5A 111600~|~1~|~1~|~01/NHS~|~Repair structure JEF-7-3103 (SFN 4101596) by patching substructure concrete, replacing the rocker bearings, and cleaning the steel pier cap.~|~13 - Bridge Rehabilitation~|~94B95E49DBE442BBB91B29426F3BB3CCAFBE4ADF 120247~|~1~|~1~|~01/SAF~|~Construction of pedestrian facilities~|~28 - Facilities for Pedestrians & Bicycles~|~9A734ED56A548F5EE05DCC69AA1876BB683109D2 94023~|~1~|~1~|~01/IMS~|~Total pavement replacement on the exit ramps from I-74 to SR 128 with new rigid pavement. The remaining entrance ramps onto I-74 will be resurfaced with asphalt.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~751983A8AC187938738A084F2FE41E4CF2662528 110731~|~1~|~1~|~01/NHS~|~Slide repair PIK 32 12.54~|~04 - Reconstruction - No Added Capacity~|~AA1A9564829EF77E1742B40C9FAD0EB1ECAE4BD1 112955~|~1~|~2~|~02/S<2~|~Marysville Urban Area Plan Split: UNI-245-7.051-7.32~|~05 - 4R Maintenance - Resurfacing~|~A5C4EBD417EC7028337224C3BDF57336EADDD571 112955~|~1~|~1~|~01/STR~|~Rural Plan Split: UNI-245-0.03-7.051 and UNI-161-0.64-0.92~|~05 - 4R Maintenance - Resurfacing~|~A5D09E51CA2D1E02380A3BD0C5E00B469A72E61C 112955~|~1~|~3~|~03/STR~|~Minor repair work and asphalt deck overlay on two structures (SFNs 8002827 & 8002851) and cleaning and sweeping on one structure (SF 8002800)~|~47 - Bridge Preventive Maintenance~|~12808C3D1543307E26B35DCCBB43FC390913E079 112955~|~1~|~4~|~04/SAF~|~Safety widening the pavement from UNI-245-0.74 to UNI-245-0.96~|~21 - Safety~|~F69EBC03D18FC2A48C031BB0919B8F26549BE6DF 119927~|~1~|~1~|~01/NFP~|~Project to apply recessed and wet reflective markings in D-05 ~|~21 - Safety~|~AE8359AE4418B6E08EDBB1DE3918C3A297093F76 95569~|~1~|~1~|~01/ENH~|~Installation of pedestrian/bicycle trail from Hall of Fame bridge to the North Canton YMCA, via Dressler Road, Glenwood, and Cleveland Avenue, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~055817AAE5306C021A34CDE8AAEE26CF7AFD6C2D 103771~|~1~|~1~|~01/NFA~|~The TID is constructing the Harrison Road Culvert Bridge including, but not limited to, roadwork improvements by removing the old bridge construction and replacing the outdated culvert with a box precast and new structural road work at the bridge.~|~01 - New Construction~|~E4D0B9191752DB9DFF6F85EEC59035E2C5235BF6 113105~|~1~|~1~|~01/IMS~|~SCI-52-16.77 to 18.82~|~05 - 4R Maintenance - Resurfacing~|~544E5D6E9A0849CA7F66B36D78098801A4C2F713 120347~|~1~|~1~|~01/STR~|~Retaining wall on CR 84~|~17 - Construction Engineering~|~8E755F3AD71919687217E30466F88595C42F3E2D 119150~|~1~|~1~|~01/IMS~|~NOB-77-1.56-6.41 North Bound Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~BA14B9E344D5165A4B56E7CAA10A59553B4EA5E5 120818~|~1~|~1~|~01/NFA~|~Replacement of existing lowering units and cameras at various locations in D07~|~21 - Safety~|~C288078CA64318F0EEEE478D945219B90F79E1D1 92979~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 83-00.00 to 11.29;~|~05 - 4R Maintenance - Resurfacing~|~156554F1452F09C43BD7D2ACC97AD4D3EAF5308F 92979~|~1~|~3~|~03/STR~|~"03/STR/BR/ " District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on Gue-83-0045~|~13 - Bridge Rehabilitation~|~1C53B805E36DAABEDB52EE5C13B9566E55D949A9 92979~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Gue-SR 660-00.00 to 06.33~|~05 - 4R Maintenance - Resurfacing~|~5DF9F0334C17A1B2D9F06EC93D601FA785760D58 82975~|~1~|~2~|~02/NHS~|~Plan Split for all work on SR 562 (Norwood Lateral) and all ramps to the Norwood Lateral.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EEC14D447A749054DDD76EE63C0A123994FBB7AA 82975~|~1~|~3~|~03/IMS~|~Funding split for work associated with Major Bridge HAM-71-0248R and Major Bridge HAM-71-0160.~|~13 - Bridge Rehabilitation~|~51A3538D66BA26F000CDDB82B31154A10023CA3D 82975~|~1~|~4~|~04/IMS~|~Plan split includes all work associated with the rehabilitation of all bridges in the project EXCEPT the Major bridges (HAM-71-0248R and HAM-71-0160).~|~13 - Bridge Rehabilitation~|~7DB5A50777F958784C9A29BAD582A631AAB3E4C4 82975~|~1~|~5~|~05/IMS~|~Plan split for slide repair work on the east side of HAM-71 from Woodburn Avenue to Montgomery Road. This work is pulled from PID 95518.~|~04 - Reconstruction - No Added Capacity~|~874D0835E41C7C7A6043E841AE8CD0F61553F16A 82975~|~1~|~6~|~06/IMS~|~ER repair - Restablize slope from embankment slide.~|~21 - Safety~|~03FE09F952C2A1E4A454AE17278918FD936405D8 82975~|~1~|~1~|~01/IMS~|~Plane and Pave a portion of IR 71 in Hamilton County from the Lytle Tunnel to SR 562 (from SLM 1.34 to 3.20 and from SLM 4.84 to 7.78). Highway signs to be included with this Plan Split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D66A0CF5DE6C72702F775BCAE79D99BAE0C43F26 102561~|~1~|~1~|~01/NHS~|~Split for work on the subject structure.~|~10 - Bridge Replacement~|~DCC2B0AC5C970922819E6BA7299D0ABFAFF2ED0E 121077~|~1~|~1~|~01/MPO~|~Demolition of structures at 1445, 1457, and 1501 Harrison Avenue, now owned by the City of Cincinnati and on the western approach to the proposed new Western Hills Viaduct (PID 105349).~|~44 - Other~|~46421082CCD84D243E124C58CC6DD52D4D1D75F9 100863~|~1~|~1~|~01/NHS~|~ROS 35 25.02-34.50~|~05 - 4R Maintenance - Resurfacing~|~90FE0EC51F5212F01A184A5F1AB644C6EB410F17 100863~|~1~|~2~|~02/NHS~|~Bridge preventative maintenance workROS 35 26.05 7102429ROS 35 26.06 7102410ROS 35 27.27 7102399ROS 35 27.28 7102380ROS 35 28.49 7102445ROS 35 28.51 7102453ROS 35 29.54 7102518ROS 35 29.55 7102488ROS 35 30.06 7102569ROS 35 30.08 7102577ROS 35 33.44 7102623ROS 35 33.48 7102631ROS 35 34.02 7102607ROS 35 34.18 7102658ROS 35 34.19 7102666~|~47 - Bridge Preventive Maintenance~|~EFB9977232E6AB52AEA028497AEF07AF53BDF4BE 100863~|~1~|~3~|~03/NHS~|~JAC 35 1.79-2.65 Safety Related Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~D8CD8B96FC67F4DB807F4D5D545E0B3A0625E982 118858~|~1~|~1~|~01/S>2~|~STP plan split.~|~05 - 4R Maintenance - Resurfacing~|~A2CB0450085956034C4D789CE47059B18F3F1A63 118858~|~1~|~2~|~02/STR~|~added STP Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~52DC2147D5FCE13E5D0CA74A663AECC7083314CC 99798~|~1~|~1~|~01/NHS~|~See linked culvert.~|~04 - Reconstruction - No Added Capacity~|~8C9452F0AA024F37343CD7730CDC03180E1C5FF0 99798~|~1~|~2~|~02/STR~|~See linked culverts.~|~04 - Reconstruction - No Added Capacity~|~788E292A96BBB2F263ED81A1E6EFDAC5B839D539 99798~|~1~|~3~|~03/S>2/NCAN~|~Miscellaneous work to SFN 7670907 STA-TR 196-0.06 Easthill Street SE over West Branch Nimishillen Creek (City of North Canton)~|~13 - Bridge Rehabilitation~|~1A1D9A87A99A704B0F9E2D1D3C97DB51852C7D31 118951~|~1~|~1~|~01/SAE~|~Plan Split for CEAO HSIP funds.~|~21 - Safety~|~28BA7643080D9DBC804952AFEA0915B6385BD800 95251~|~1~|~1~|~01/NFP~|~Mowing various routes in Ashtabula, Trumbull, Mahoning, Columbiana, Stark, Wayne, Ashland, and Richland Counties.~|~44 - Other~|~D5B07A71025DD71F97DBF26056CDE1F53F04B78E 93180~|~1~|~1~|~01/S<2~|~Work shall consist of pavement planing and resurfacing with asphalt concrete on SR 72 from 10.04 (Second Street) to SLM 10.93 (Home Road).~|~05 - 4R Maintenance - Resurfacing~|~B72B6C1277D7657AFEF64CDEB04CC12B29F901B2 120195~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in the construction phase~|~05 - 4R Maintenance - Resurfacing~|~B572A94136C717AB7B4C6C9E2721E27B22E9FFC9 106104~|~1~|~1~|~01/S>2~|~Fort Washington Way pump station repairs.~|~44 - Other~|~7EA5A394A5152C0DD29EFD38E46D6C9C8AA2CEEA 106104~|~1~|~2~|~02/S>2~|~For operations and maintenance.~|~44 - Other~|~AAFF46441B32D6DA6CD980DDBD6A23DD38C8EE5A 96421~|~1~|~2~|~02/IMS~|~Plan Split for the repalcement of the DMS sign on southbound I-75 near Union Centere Blvd.~|~21 - Safety~|~0F47C67BD4F911EBCA5113288C057DA42891A5F3 96421~|~1~|~1~|~01/IMS~|~Lengthen the acceleration lane for the northbound on ramp from east and west IR275 to get as close to the 2000' as shown in fig. 505-1b of the location and design manual.~|~21 - Safety~|~E0548E75A278E211C2C54E309A4D2DFA1D93E1D5 112769~|~1~|~1~|~01/NFA~|~Plan split for the federally elligible costs associated with construction for the OBPP funded bridge replacement on Ruff Rd.~|~10 - Bridge Replacement~|~FF4407C2DADAB5DB2642E0FF8E19B444E2F31623 112769~|~1~|~2~|~02/BRF~|~Plan split for design costs of Design Build Team~|~15 - Preliminary Engineering~|~38D9596CD639686137F2624B874403F92670C8F6 76667~|~1~|~1~|~01/NFP~|~Full depth removal and replacement of the existing IR 70 mainline pavement, including interchange ramps; addition of a third lane in each direction as a result of MOT operations and other roadway improvements on MOT-IR-70 10.790 to 14.220 13.72 lane miles.~|~03 - Reconstruction - Added Capacity~|~5DA1320C4F644578DE6B8615E6AEA39F42928354 76667~|~1~|~2~|~02/NFP~|~Replacement of SFN 5705525 MOT IR 70 11.30. Replacement of SFN 5705495 MOT IR 70 11.30 SFN 5705703 MOT IR 70 12.67 SFN 5705738 MOT IR 70 12.67 SFN MOT IR 70 2.30 SFN 5705649 MOT IR 70 12.19. Rehabilitation of: SFN 5705614 MOT IR 70 11.92 SFN 5705584 MOT IR 70 11.92.~|~10 - Bridge Replacement~|~9BF5E6CC30BA931B8356E6F2ECC8DFB0ADB767BD 124435~|~1~|~1~|~01/STR~|~Work to widen and realign MRW SR 95~|~04 - Reconstruction - No Added Capacity~|~CC29B0B881B13EA3AB0B1D01A3B14216168DCB21 98616~|~1~|~1~|~01/NFP~|~Pavement repairs and drainage improvement along Ellsworth Bailey Road adjacent to the Ohio Turnpike (Exit 215), in the Village of Lordstown, Trumbull County, Ohio.~|~~|~EFAB64FD10B0200CC51A90B0D403987A6F331001 18747~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds: 4305078~|~13 - Bridge Rehabilitation~|~99F32769240081FCDF87B60642DFF66E57FEB212 108995~|~1~|~1~|~01/NHS~|~Removal of Ash trees. District wide. Safety Funded.~|~21 - Safety~|~7237DCFDD71E7BB4CD93E9895F943B06B032FA9C 108995~|~1~|~2~|~02/STR~|~Removal of Ash trees. District wide. Safety Funded.~|~21 - Safety~|~8BCFA90E31FCDDA0C08016C0C407FD5902745DE1 108995~|~1~|~3~|~03/NFA~|~Removal of Ash trees. District wide. Safety Funded.~|~21 - Safety~|~BA640D81074D0EA6B4322FECB34C4D6151869950 108995~|~1~|~4~|~04/S<2~|~Removal of Ash trees. Safety Funded. WAS 60 3.031-3.066, 3.216/3.216, 4.468/4.468, 5.247/5.247. Urban other federal aid.~|~21 - Safety~|~5CB53A45AA3431A0B9378E3ECBF01FF6E589AC30 125698~|~1~|~1~|~01/SAF/PENI~|~Safety improvements.~|~21 - Safety~|~7563AB1F9EC3746D702D62B85CA055C33F541027 125698~|~1~|~2~|~02/STR/PENI~|~100% local items including lighting and landscaping.~|~04 - Reconstruction - No Added Capacity~|~B2097BCA15DAE1C4972468B0B9F4128CFF1D8194 98562~|~1~|~3~|~03/BRO~|~Test Linking Bidges already on Splits~|~~|~3049F60AF274208B438B959F27AA32B5EEB4A888 98562~|~1~|~1~|~01/NHS~|~Test~|~03 - Reconstruction - Added Capacity~|~726A55F3970EDDB0291F44E4904B87D1C62EE06B 98562~|~1~|~4~|~04/STR~|~Test~|~~|~A2AAC435C5F4451E94631817460166717593015B 98562~|~1~|~2~|~02/IMS~|~Testing Link 2 Bridges~|~~|~FC88FFD51A778B4BE2EDB2A1806C92ABAF74D669 98562~|~1~|~5~|~05/IMS~|~test~|~03 - Reconstruction - Added Capacity~|~4DA822605841A560797E8FC65359BC77F9FCE256 107643~|~1~|~1~|~01/STR~|~SCI 335 6.09 (SFN 7304951)~|~04 - Reconstruction - No Added Capacity~|~B8561684F9E1E299B1855EA31CE86E767D11038C 98519~|~1~|~2~|~02/STR~|~Sign Replacement: ERI 4 0.00-7.95~|~21 - Safety~|~625205E63FB845274E69338B40564C1E502FE230 98519~|~1~|~1~|~01/NHS~|~Sign Replacement: CRA 30 0.00-3.68/ ERI 250 0.00-1.14, 4.39-12.47/ WAY 21 0.00-5.86/ WAY 585 16.98-18.63.~|~21 - Safety~|~5379DEDA444133DC9C961BA1EB78AE5E95F5A6E0 98519~|~4~|~4~|~04/SAF~|~St. Mary's School Flashers-Safety Funds.~|~21 - Safety~|~22768D80F75B347989636150A7B31DE878BD0489 98519~|~1~|~3~|~03/S<2~|~Sign Replacement: ERI 4 7.95-8.60, 8.92-12.20~|~21 - Safety~|~E7FD60F68BF7BA9284222734C6EE6154C96BB30D 90381~|~1~|~1~|~01/ENH~|~Enhancement Plan Split for Lighting Project on Raccoon Road~|~21 - Safety~|~9C60177B42F832E7F2E6718970C40330CC927EBC 113082~|~1~|~1~|~01/SAF~|~District-wide fast drying pavement markers.~|~21 - Safety~|~8CBF837748705376AF462A8630E502526CBA3690 101308~|~1~|~1~|~01/NHS~|~AC Overlay on DEL-36-12.83-17.64~|~05 - 4R Maintenance - Resurfacing~|~B90F722C1896B0FCB5E0C33A6AAE1BEAEAAB359A 127133~|~1~|~1~|~01/SAF~|~Improvements to the horizontal and vertical alignment of CR 12 (Antioch Road), widening of pavement and shoulders, and removal of fixed objects from the clear zaone.~|~21 - Safety~|~561110A824092C2228A763C52330531500152B88 110462~|~1~|~1~|~01/SAE~|~Construct roundabout at the intersection of SR-123 & SR-132.~|~~|~436A381D126ADB524549E4EE4E2BA884C9863A22 124957~|~1~|~1~|~01/MPO~|~Plan split for OKI RPP eligible expenses~|~05 - 4R Maintenance - Resurfacing~|~4ACAFFBE3835DA95A88D9F92019A84D24D714364 116103~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~C6E06B48B1C2D0F82A462821FE8220F6070693A3 92705~|~1~|~1~|~01/MPO~|~Resurfacing CR 106 1.67 - 2.87~|~05 - 4R Maintenance - Resurfacing~|~F878559DA78CCA258A73149E0AAE8ABCBB2202D8 103301~|~1~|~1~|~01/NFP~|~Split for sign and sign support work~|~44 - Other~|~367D84ED670669A1391605D5045084203C05CBC6 103301~|~1~|~2~|~02/NFP~|~Split 2 for work to replace the sign support structure at I-480 and State Road~|~44 - Other~|~0B3F9F446C3097EAD8AF6F735F2D53B2AE965BA2 115739~|~1~|~1~|~01/NFP~|~All work in the project is in this plan split.~|~03 - Reconstruction - Added Capacity~|~A43E0C0D58621E321DCF4067EACB786608E2FFEF 107832~|~1~|~1~|~01/IMS~|~This plan split will cover the preservation work on the structure.~|~13 - Bridge Rehabilitation~|~3482F7B88536022DC8EDFD3C0995A878D4009730 107832~|~3~|~3~|~03/SAF~|~Addition of a Shared Use Path to the Hall Road bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~9F0E81F0C8082E693F5658761510665C7F1FC559 107832~|~2~|~2~|~02/IMS/Colu~|~This plan split will cover the locally funded lighting and widening work.~|~13 - Bridge Rehabilitation~|~AA5837EDD849DCF5C108B2B8DEC4DF2A84292346 90637~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D4FDCB21D36852A358CF24217A6A0A055C8E201F 106276~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAR-4-10.01-13.00~|~05 - 4R Maintenance - Resurfacing~|~EB0F2D6C6D6CE5F60CEC3537C2F13C8EF9B1DB1B 106276~|~1~|~2~|~02/S<2~|~MAR 4 from 8.37 to 10.01 ~|~05 - 4R Maintenance - Resurfacing~|~659367BA93BFE1A7E488BEAA55249BB6763EADBA 106276~|~1~|~3~|~03/S<2/COM~|~Eligible items not covered by Urban Paving Policy including curb ramp work and pavement repairs in the City of Marion.~|~05 - 4R Maintenance - Resurfacing~|~FFED8BF899946CAE6C9B74158B85D49FA6D8FE5B 117382~|~1~|~1~|~01/MPO/LOWE~|~Resurfacing. Functional Class of E McGaffney Ave between Washington Ave and Munroe St to be reclassified as Minor Arterial (Urban).~|~~|~57A76C160C04426B227351F650AC321151D5B3DA 122834~|~1~|~1~|~01/ERD~|~Earmark OH469~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D6EB2F93B2D1AE716A199C126B5F98DDE2E682EF 99646~|~1~|~1~|~01/NHS~|~Replace existing steel beam bridge COL 7 2634 (SFN 1500368) with new steel beam bridge.~|~10 - Bridge Replacement~|~81968B906422943D2082A38B3BF0CB8D89E34206 114080~|~1~|~1~|~01/S<2~|~Resurfacing & storm sewer replacement, curb improvements, and other misc roadway items along Trenton Ave (4B97 Small City Program to provide 95% of the eligible costs, up to a max of $658,804)~|~05 - 4R Maintenance - Resurfacing~|~30C2E4E713372B9D9C991C83227A7014650ECE65 103527~|~1~|~1~|~01/S>2~|~Paving DEL-36-22.25 to 22.84~|~05 - 4R Maintenance - Resurfacing~|~061144A8C2D38B74CD44632A27B6265E2DB218C1 103527~|~1~|~2~|~02/STR~|~Paving DEL-36-22.84 to 28.61~|~05 - 4R Maintenance - Resurfacing~|~47695B9E4C1E3223CA84D1CD46434790A2003E47 103527~|~1~|~3~|~03/SAF~|~Guardrail work at Ramp A (71/36). DEL-36-17.90 to 17.93~|~21 - Safety~|~B3E46232571BE4EB788B148EF425A749AB181516 109826~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout ATB, MAH and TRU counties.~|~21 - Safety~|~7836CF4BD5A8014E5055B25C9F88CA188A5C3405 110969~|~1~|~1~|~01/NFP~|~Bridge Inspection plan split~|~17 - Construction Engineering~|~9B8767AA21FB9BCD8971350C430BFAA8130AF2A5 102039~|~1~|~1~|~01/STR~|~Slide Repair on ADA SR 348 0.05.~|~44 - Other~|~FAAC22400A81AD51B9D72FDF16B9D605597CC8F1 88777~|~1~|~1~|~01/STR~|~Replace deteriorating structure with minimal approach work on SFN 5701384 MOT 35 0036 over Tributary Tom's Run.~|~10 - Bridge Replacement~|~D9BAD47C9433B9B713372FF0C20FB04FF9E5E764 119174~|~1~|~1~|~01/STR~|~Resurface roadway~|~05 - 4R Maintenance - Resurfacing~|~15340A0C606FD1D2147D4AB2DCB234FA1EAC0B71 123428~|~1~|~1~|~01/SAE~|~Plan split for 100% Safety-funded items in Target Speed Pilot that will install pedestrian hybrid beacons and other enhanced crossing elements at several locations.~|~21 - Safety~|~9E4C9A35547C54FE4FC562206C3F5C140E5D90ED 123428~|~1~|~2~|~02/S>2~|~Plan split for 100% locally funded resurfacing associated within project area of the Target Speed Pilot project.~|~05 - 4R Maintenance - Resurfacing~|~43C65F0E3EA875741FC0CB56FFACD7AE47A084D6 98813~|~1~|~2~|~02/BRF/KCEO~|~Salvage material cost from deficient bridge in Knox County - 100% local cost~|~~|~6CF09FCC317DA8B640BDFF610155546DBB73BB7A 98813~|~1~|~1~|~01/BRF/KCEO~|~Knox County Engineer's CEAO Local Bridge Replacement Funds - 4B87 (Federal 80%) / CB (4BG7 15%) / 4BG7 (Local 5%) - See CAP Comments - Replacement of deficient bridge (SFN 4231414) in Knox County. BR Eligible for Replacement: Length = 68'; SD/FO (1); DSR = 5; SR = 24.0~|~10 - Bridge Replacement~|~873A28AD0FA09972C460689CA9E7E44DA5C9F8CE 106603~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funds 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - LIC IR 70 13.71~|~13 - Bridge Rehabilitation~|~DE3034916BA7F16195CB17E95C21663D5DDEBED9 106603~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funds 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - 1) FAI US 33 8.77; 2) FAI US 33 12.78; 3) FAI US 33 15.05; 4) FAI US 33 16.69; 5) FAI US 33 18.35; 6) FAI US 33 20.65; 7) FAI US 33 20.67;~|~13 - Bridge Rehabilitation~|~D4F817DB40F9D229BE96E8B85AA88591107B0060 92677~|~1~|~1~|~01/S>2~|~STP Plan Split for SUM TR 102 for SLM 1.81 to 3.06~|~05 - 4R Maintenance - Resurfacing~|~EDD4792F403781CA143272AA3BCD6BE68F9CA4AC 100371~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~0554B38EE077A336A164E2CAAE072302FEA6D8AA 106260~|~1~|~1~|~01/S>2/COC~|~City of Columbus Urban Paving plan Split.~|~05 - 4R Maintenance - Resurfacing~|~42FCF198C4BFDE7BA1D996AE836182BB1EEB7005 106260~|~1~|~2~|~02/S>2~|~SR-3 (ODOT Jurisdiction) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~6DC13791E72E03D1D1FFD156D1F223C42937CB00 106260~|~1~|~3~|~03/SAF~|~Widening to shift lane reduction/merge on SB SR-3 to be located south of Minerva Lake Rd intersection. ~|~21 - Safety~|~95DBE3455535A8381ACFFC053D1955ADC01E68C0 106260~|~1~|~4~|~04/S>2~|~100% Local plan split - for pavement repairs located within the City of Columbus Corp limits.~|~05 - 4R Maintenance - Resurfacing~|~4945D9268478A4717979313E29BE921402A87C82 106260~|~1~|~5~|~05/S>2~|~All items of work associated with SFN: 2500191 - FRA-3-23.83 over Kilbourne Run~|~47 - Bridge Preventive Maintenance~|~AF360DF948E05792D4209278A98C2ACFFFED96F5 121563~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~736BF174AD808B69D03582920A484034AD230EF6 94175~|~1~|~1~|~01/NHS~|~Replace the superstructure and abutments down to footings for BUT-27-1402 (SFN 0900753).~|~13 - Bridge Rehabilitation~|~62547591EF1DE1C37ABA330D852FBA921443A1FD 110426~|~1~|~1~|~01/SAF~|~Work to add the left-turn lanes and signal upgrades using federal-aid~|~21 - Safety~|~6236E61BBD7D396E4F9D5A82044A088648DF68CB 118182~|~1~|~1~|~01/SAF~|~All items associated with safety project.~|~21 - Safety~|~4DF22616368BD88ACA8E3427230B024946E75CE6 118182~|~1~|~2~|~02/NHS~|~Plan split for installing RW fence along MAR-23.~|~44 - Other~|~4586DDBE80B73F27ABEAEE2CCA7184A52B080C83 118182~|~1~|~3~|~03/STR~|~Plan split for replacement of culvert at MAR-423-1.605.~|~04 - Reconstruction - No Added Capacity~|~27B67031B26C2A08754D0AAC8A328BD0750187DB 113229~|~1~|~1~|~01/NHS~|~Access Management / Safety ? Closure of US 33 median, removal of existing left turn lanes, and disconnect CR 7 (Johnson Rd) from US 33. Intersection with River Rd will remain as right in right out. ATH US 33 10.80-11.06.~|~21 - Safety~|~14C4CC7C97A49CC27371850DD731C0CDEAF058C0 96313~|~1~|~1~|~01/NFP~|~Non Fed Aid. 100% State Bridge work~|~~|~F0DC073848A5541D61D6BD5F59E0CF093F3D50DB 106600~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - Knox County Engineer project to replace bridge Kno-CR53-2.66 (SFN 4231449) using the Federal/State Exchange Program with state max of $1,276,563 at 95%~|~10 - Bridge Replacement~|~C0AEF7E3CE60031BF364D7DF9893D0A4DF474FEF 109739~|~1~|~1~|~01/STR~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~E12AFB21F4D57132C9A98AEF39FDC6DDA00EA947 109739~|~1~|~2~|~02/S>2~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~E230F43FEC2C7F104FAAA5154867E26AEA79E8AF 92623~|~1~|~1~|~01/MPO~|~Resurfacing Project~|~05 - 4R Maintenance - Resurfacing~|~DA90134E123475CA034CD45C6D372706A65E3624 92623~|~2~|~2~|~02/S<2/WAY~|~Added plan split 2 for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~DFEA4795111CB68AF088A44470AE76A8E22E833F 109560~|~1~|~1~|~01/BRF~|~Bridge Plan Split~|~10 - Bridge Replacement~|~FC46ECF451221195586F517B8C9A570057FAF4CC 86932~|~1~|~2~|~02/STR~|~Replace SFN 6704476 POR-SR 303-10.51 over Branch of Mahoning River.~|~10 - Bridge Replacement~|~023EBBC5995FCFDE87BB3FE17949FAAA01EB0343 86932~|~1~|~1~|~01/STR~|~Plan Split for POR SR 303 8.71 to 13.03~|~05 - 4R Maintenance - Resurfacing~|~D9E4915F782DC014E4325FA622019BCDCBC54133 125483~|~1~|~1~|~01/MPO~|~Plan split 1, 80/20 (4TA7/KI08)/(LNTP) for eligible project expenses on FAS~|~21 - Safety~|~41916306FBC2AF3EB23B6F23CD3A6DDB88301A45 121794~|~1~|~1~|~01/SAF~|~GR on various CR. ~|~21 - Safety~|~95366E10A74672044FC8337E7FF66871F979E663 99487~|~1~|~1~|~01/NHS~|~Reactive Maintenance: RIC-30-9.13-13.00~|~05 - 4R Maintenance - Resurfacing~|~3324C80AD4E64AF87388E025E308602061629428 99487~|~1~|~2~|~02/IMS~|~Plane and Pave: RIC-71/30 Interchange Ramps~|~05 - 4R Maintenance - Resurfacing~|~AC157DCAA5CAA8DCB56C2513B1CD40FE1D84C495 99487~|~1~|~3~|~03/NHS~|~Bridge Work: RIC-30-11.58 (L&R)~|~13 - Bridge Rehabilitation~|~9D38B7A376A3B574459295280120C66B82BD484F 93787~|~1~|~2~|~02/S<2~|~02/S<2/PV/ ; This plan split is for resurfacing work inside of the City of Upper Sandusky. The City is responsible for the 20% non-federal match. The 80% federal funds will be from the District Preservation Program Budget.~|~04 - Reconstruction - No Added Capacity~|~6562B9B31E05DB489C9264C47E6F00842D0B64BA 93787~|~1~|~1~|~01/S<2/USAN~|~01/S<2/PV/USAN ; This plan split is for work eligible for federal funds from the small cities program.~|~04 - Reconstruction - No Added Capacity~|~C73F0CC92F96A6F28778D41E8BF4A79C85456834 93787~|~1~|~3~|~03/NFP/USAN~|~Work on a waterline. No ODOT or federal funds. Ohio Public Works Commission funds.~|~43 - Utilities~|~F43F644C2F7F3F9539057994DB2349C77B3E8892 123853~|~1~|~1~|~01/SAF~|~80% CEAO HSIP, 20% Local up to $489,600, 100% local after cap and for non eligible expenses in construction~|~17 - Construction Engineering~|~C54B7EA346D67DFD414D48E2AD8B76FEFC2E7B55 83883~|~1~|~3~|~03/STR~|~D6 funding for DEL-315: 4.10-8.40STP Rural area~|~05 - 4R Maintenance - Resurfacing~|~434E37F36009E25B0C2E889504686EF0F75C8822 83883~|~1~|~1~|~01/IMS~|~Interstate D6 funding for FRA-70 and FRA-270~|~05 - 4R Maintenance - Resurfacing~|~560EF015DFE5A5A496B581A179E836B5760D9F0F 83883~|~1~|~4~|~04/S<2~|~D6 funding for DEL-315: 8.40-8.65STP Small Urban (Delaware) area~|~05 - 4R Maintenance - Resurfacing~|~E318B65A132C820D800EF25C6D7A6992D88EA9E1 83883~|~1~|~2~|~02/S>2~|~D6 funding for DEL-315:0.00-1.73 & 1.95-4.10STP Large Urban (Columbus) area~|~05 - 4R Maintenance - Resurfacing~|~E79BFD296C4821F819642BC898D747E347D4F5A4 109754~|~1~|~1~|~01/STR~|~Pavement maintenance on SR 60 & 541~|~05 - 4R Maintenance - Resurfacing~|~97580CF79DB292DB2D9267907EF0F7515C4BDC51 109754~|~1~|~2~|~02/NFA~|~Pavement maintenance on SR 621~|~05 - 4R Maintenance - Resurfacing~|~6A9BCADDF8311583D7E5B0992FA58C0EEF24941D 96845~|~1~|~1~|~01/IMS~|~Provide maintenance and upkeep of the landscaping of the I70/I75 interchange.~|~31 - Landscaping & Other Scenic Beautification~|~44FE5CD107554C12225FA941F33A9057E1D89EED 108016~|~1~|~1~|~01/NFP~|~Pruning~|~44 - Other~|~4CF7A2E82C359FF2A8F605EAE82AEDE571E5ECA8 113040~|~1~|~1~|~01/STR~|~All the resurfacing of SR 109 in this project. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~72CD2F41938A806B00DACD85D0B8655E4D9D88AB 98768~|~1~|~1~|~01/SAE~|~Intersection of Detroit Ave and Glendale Ave~|~21 - Safety~|~8953BA2A3B16C8283219D67CC589D32D6667170B 122128~|~1~|~1~|~01/IMS~|~Plan Split for noise barrier repair~|~20 - Environmental Only~|~75B72E40FDC515A2EF590B9E29252E326524C4F8 113402~|~1~|~1~|~01/SAE~|~100% CEAO HSIP funding for upgrading guardrail on county roads~|~21 - Safety~|~ECF09949E391BA47DDE6F28CCDBFAF3EF818A77D 104714~|~1~|~1~|~01/IMS~|~Diamond grinding on IR.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~13EBA485C32F84079D7FA275D53DC6F885BD53AE 125797~|~1~|~1~|~01/BRF~|~Bridge replacement ~|~10 - Bridge Replacement~|~0A96A4C98D6A1C681C1E2279D19E839337F9B322 98650~|~1~|~1~|~01/IMS~|~8704953~|~44 - Other~|~873DF79461C7C174EE46FDE0A45CAD8379E41E57 113599~|~1~|~1~|~01/S5K~|~Traffic signal upgrade with RR crossing preemption.~|~22 - Rail/Highway crossing~|~FCD94A766DE254C10415AF0C6D9E13A937BE4F80 102240~|~1~|~1~|~01/S<2~|~Paving on Burbank, Friendsville, Milltown and Bowman STreets.~|~05 - 4R Maintenance - Resurfacing~|~5CDD48BCD33836EB9E735658B16E30EDF7738573 102240~|~1~|~2~|~02/S<2~|~100% local items~|~05 - 4R Maintenance - Resurfacing~|~7C4EE4E80B1BBCE085313399C70CD7E0FDBD8BC8 102240~|~1~|~3~|~03/NHS~|~Portion of project that is NHS. Bowman Street~|~05 - 4R Maintenance - Resurfacing~|~ABF6C0F8F1866BF1E09AAD9F91671BB227FD4036 98167~|~1~|~1~|~01/S<2~|~Plan split for Bridge approach slab jacking. SFN 4002237~|~44 - Other~|~273C3CA5FF5D490BD916E2BF94864532ABD8C27D 126695~|~1~|~1~|~01/NHS~|~Flat Sheet sign replacement project in FY2024 WAS county.~|~21 - Safety~|~348F0862A5611C8ACA90CDF937014A5F44E41310 101449~|~1~|~1~|~01/IMS~|~RIC IR 71 003.19 -Culvert Repair:Removal of Bridge abutment piling that was accidently driven through the culvert.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BC63FE65796CA8AAFDDF70FBE9CE69416182B8EC 101449~|~1~|~2~|~02/NHS~|~ERI US 0250 08.98- Culvert Repair:Installation of a concrete invert and pipe joint gaskets.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3DBC2B034C7B63D93AC8F1698813DDBC04D2CC21 101449~|~1~|~3~|~03/STR~|~WAY SR 0095 05.49-Installation of a concrete culvert invert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E1D28016CEF39EDDB9DEDE8A69DBBD610F3C8B91 117472~|~1~|~1~|~01/BRF~|~Bridge rehabilitation (SFN 2531933)~|~13 - Bridge Rehabilitation~|~0FE2ADE9E33E01FF912CE291517C2346F47BFAF6 123892~|~1~|~1~|~01/NFA~|~Trail Improvement~|~28 - Facilities for Pedestrians & Bicycles~|~FE6FEFFD5788EDFA2E617D58A4B22D805C9BB853 103816~|~1~|~1~|~01/STR~|~Replace bridge superstructure on rural route.~|~10 - Bridge Replacement~|~2416DDC93ECED5BC179E9C1BFD611F26769B7E4F 88277~|~1~|~1~|~01/ENH~|~BRO US52 19.44 Aberdeen SRTS - Safe Routes to SchoolProject Termini: Along US52, begin @ Huntington Ave (19.44) east and terminate at Elm Street (19.94). Project Description: It is proposed to construct Phase 2 of the Aberdeen SRTS Shared Use Path begining at Huntington Parkway, east to Elm Street. 100% Fed 01/ENH/OT/Aberdeen~|~28 - Facilities for Pedestrians & Bicycles~|~71C99FF4D17E24CB2A3ED9A69D9D505A3212DA90 118535~|~1~|~1~|~01/STR~|~Bridge replacement.~|~13 - Bridge Rehabilitation~|~7EFD3D237022FBF4409C81A1FD90D685B85E170B 118535~|~1~|~2~|~02/STR~|~Replace culvert.~|~04 - Reconstruction - No Added Capacity~|~5811FB3E69F308CCAAA989574E5AD73C3021E2F8 94107~|~1~|~1~|~01/STR~|~Various resurfacing treatments to ATB SR 46 16.38 to 22.04, ATB SR 307 3.22 to 12.78. See work locations for specific treatments and sections.~|~05 - 4R Maintenance - Resurfacing~|~EDC81B183BCB9A7B9E8D45491D377797591D369B 94107~|~1~|~2~|~02/STR~|~Bridge Maintenance on SFN 0405809 ATB SR 307 7.65 over Coffee Creek, SFN 0405833 ATB SR 307 9.03 over Center Creek, SFN 0405884 ATB SR 307 11.03 over Mill Creek.~|~13 - Bridge Rehabilitation~|~47B22F9713720C21C4FF142B958466F9BCC295B7 92602~|~1~|~1~|~01/STR~|~80/20 fed/state fund split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~66529B68FB66EEC27BE1C9693BDEDC04A5DAD757 125443~|~1~|~1~|~01/BRF~|~Replacement of SFN 0963100 carrying Augusta Blvd. over a tributary to Pleasant Run in the City of Fairfield.~|~10 - Bridge Replacement~|~17CAF0E9EE1E9ACD1F82F8FE613954D84EFB9E41 104288~|~1~|~1~|~01/NFP~|~Pruning, Tree/Bush removal~|~44 - Other~|~B6A470B3DD5B18BB1372B0A3B2B61ACAEB20E8CA 125789~|~1~|~1~|~01/S50~|~All work included in this split.~|~05 - 4R Maintenance - Resurfacing~|~4ED52948B46DB7A97E85B1898279D309193282BD 119179~|~1~|~1~|~01/SAF~|~Plan split for pavement markings~|~21 - Safety~|~DED740E509733230CBE125CDF9A1B8105AB0855A 108685~|~1~|~1~|~01/SAF~|~Add turn lanes and upgrade signals on US 42 at SR 257 and SR 745~|~21 - Safety~|~E6E49927C4B21D13306BCB2F2014B66FF1FED20F 108685~|~1~|~2~|~02/SAF~|~Resurfacing, shoulder widening, and guardrail upgrading Sta 89+45 to Sta 102+10~|~21 - Safety~|~267BA5A37E98796789A3762734B4CE46DA8BFD76 108685~|~1~|~4~|~04/SAF~|~Culvert lengthening including guardrail CFN 1821801, 1977324, 1875647~|~21 - Safety~|~9A015F6D6F553AE6B86084773C249C26A19BF18B 108685~|~1~|~3~|~03/NHS~|~Existing culvert length in safety section - CFN 1821801, 1977324, 1875647 and entire culvert CFN 1874858~|~04 - Reconstruction - No Added Capacity~|~642CFED3BD0D38060BE5E1C2BBFD17179BDEC9EF 121101~|~1~|~1~|~01/IMS~|~Construction~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EA72F862DCF6DA424577A9BC2195E2A8325D48FD 123708~|~1~|~1~|~01/S>2~|~plan split for resurfacing on BUT-63~|~05 - 4R Maintenance - Resurfacing~|~3F01D5799D40A61951CCF95132136CEC72F76CA7 97288~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~943F55D8E0DDB30B72114ED589559DAD3D162DAE 116523~|~1~|~1~|~01/NHS~|~Added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4DAFCB351FF2EFB9C02C9B3E7EECBBAB81254F37 117790~|~1~|~1~|~01/NHS~|~Noise wall construction~|~20 - Environmental Only~|~8250FC96E01A5B640F9DDD503E1157299ADB4D54 105516~|~1~|~1~|~01/STR~|~All routes and bridges on those routes, except MAR-95 locations~|~05 - 4R Maintenance - Resurfacing~|~519BFA71BFC00FAB3A04AE8F397E30498BD578CA 105516~|~1~|~2~|~02/NHS~|~MAR-95 location and bridges on that route.~|~05 - 4R Maintenance - Resurfacing~|~C425E8287A9D3121DBCDE20911191BA54C6B9E8C 114653~|~1~|~3~|~03/STR~|~Project work on the rural bridges less than 20 ft: PRE-503 and PRE-725~|~04 - Reconstruction - No Added Capacity~|~4C91756617BB10D704E4C5F24317694DCD127C4D 114653~|~1~|~1~|~01/NHS~|~Project work on the NHS bridges less than 20 ft: BUT-4B and BUT-27~|~04 - Reconstruction - No Added Capacity~|~8433F55E463F9E772E5906E1F6122C0FAA1679D3 114653~|~1~|~2~|~02/NHS~|~Project work on the NHS bridge greater than 20 ft: BUT-122~|~13 - Bridge Rehabilitation~|~FBDB6E30E8CB7FE7FFD57939B4A4E8FBD71AE970 114653~|~1~|~4~|~04/STR~|~Project work on the rural bridge greater than 20 ft: PRE-732~|~13 - Bridge Rehabilitation~|~D859B2C719D05C184667EEE12008F6E7308E43FA 108032~|~1~|~1~|~01/NFP~|~RPM~|~21 - Safety~|~F0AD7A15562649E5F96111341F831DCDE3D8E55C 115023~|~1~|~1~|~01/STR~|~Rural~|~05 - 4R Maintenance - Resurfacing~|~3FA8486CD5ED38B4B609DD88939E8D582ED693D8 96770~|~1~|~1~|~01/STR~|~It is proposed on SR 41 in the Peebles Corp Limit, SLM 25.95, 0.45 miles north of the south Peebles Corp limit, to repair the steps at the cornor of Olive St. and SR 41 by making it ADA accessible.~|~21 - Safety~|~B2576F9AC39239669B6B8F4D25ECDFFC5D88201F 125524~|~1~|~1~|~01/STR~|~Culvert repairs and replacements.~|~04 - Reconstruction - No Added Capacity~|~CDC64A4ED5C29128FFFB6A4178170C2ECF9CC333 126780~|~1~|~1~|~01/NHS~|~Reconstructing US-6 in Williams County SLMs 13.88 - 24.25~|~04 - Reconstruction - No Added Capacity~|~7DCDDCC4D581D1D7C258104E9BC9726EABB94CBD 110151~|~1~|~1~|~01/NHS~|~Paint Bridge Superstructure.~|~47 - Bridge Preventive Maintenance~|~385FC6BE0B76277DC8A06CD0A63F12515F174E6C 99755~|~1~|~1~|~01/SAE~|~Traffic signal for traffic control at highway-rail grade crossing.~|~17 - Construction Engineering~|~266D25B32249688DCAA3B560A13B1152AABABBD5 103419~|~1~|~1~|~01/STR~|~Landslide repair. NOB 146 17.12. Work length approximately 290 ft. DSR NOB-005.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6193D6041988B7754FC057BBD3E53F0F032D2A2 94619~|~1~|~1~|~01/IMS~|~I-475 EB exit ramp at Corey and I-475 WB exit ramp at Talmadge~|~21 - Safety~|~42C4A68E99693126CB7E34AA15B14DAE3A641671 97637~|~1~|~1~|~01/NFP~|~Construction of new Grafton Outpost~|~44 - Other~|~D325F75DC6E9F2162F71EE4BCC55180FF5B48F3F 127112~|~1~|~1~|~01/S>2~|~Widening of Morse Rd and roundabout at Harlem Rd~|~21 - Safety~|~A7EE9961A709C6AD9947840EE0C5E1175EA24252 120664~|~1~|~2~|~02/IMS/KY~|~T1 Repairs~|~47 - Bridge Preventive Maintenance~|~2308154A7BE1793320DD5598E9D63F9CA2FE3682 120664~|~1~|~1~|~01/IMS~|~100% State Funds for T1 Remediation Project (Bridge Preservation/Maintenance)~|~47 - Bridge Preventive Maintenance~|~323BFFCAB9447B7FE1338E884384449A4B4882C8 108143~|~1~|~1~|~01/BRO~|~Replace slab superstructure on bridge TUS-416-0478 (SFN 7905920) with new slab superstructure. Encase pier piling. Rehabilitate abutments.~|~13 - Bridge Rehabilitation~|~3D55EA2AAACF3AE958E5C3150D82D3714F842AF9 122021~|~1~|~1~|~01/S>2~|~Pedestrian improvements~|~28 - Facilities for Pedestrians & Bicycles~|~706701E9256F79FB3E517D4F5764FE5FF7F28C0F 93971~|~1~|~1~|~01/NFP~|~FY2017 District wide raised pavement markers.~|~21 - Safety~|~C2754656CA99B10EE9067C54D8AE00ADD13873E5 123550~|~1~|~1~|~01/NFP~|~D09 BM FY2031 ~|~47 - Bridge Preventive Maintenance~|~A7320BA8D5032B52E9FA1B5DA36931172079BF2F 105701~|~1~|~1~|~01/STR~|~Signage~|~~|~50290764986A6026C44A2CCEFA7C77F70C29A0FE 105949~|~1~|~1~|~01/NFA~|~SCI-TR 262-0.48 (SFN 7334362) Mill Road~|~10 - Bridge Replacement~|~AF221A87F86EADEA2FB98FF8A311E21DD9C07373 95209~|~1~|~1~|~01/NFA~|~Pave bikeway from Vine Street in Coldwater to Schunck Road in Celina.~|~28 - Facilities for Pedestrians & Bicycles~|~57C00E98BCF18B669D871BA2C3C4CB4A1B6F4671 123639~|~1~|~1~|~01/NHS~|~Repair damage caused by vehicle hit~|~13 - Bridge Rehabilitation~|~EB89731B9BD88B01DF4B01A4B2193A78D49CFDCD 101300~|~1~|~1~|~01/NFP~|~Chip seal plan split~|~17 - Construction Engineering~|~D389A9F929A1207E86DA533E30C4E3AEF9AA3288 92099~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to construct a roundabout at LUC CR24 4-4.2/LUC CR69 1.68-1.7~|~21 - Safety~|~2A5033AA64B5BFACDE9E19BDE49E02D5BBD2FD66 90252~|~1~|~1~|~01/STR~|~ROS Various routes in Ross County for FY2013 It is proposed to upgrade/replace guardrail on various routes in Ross CountyROS-CR-1 CROSCR00001**C 0.000 to 9.500 ROS-CR-28 CROSCR00028**C 5.190 to 5.560 ROS-CR-60 CROSCR00060**C 0.000 to 1.690 ROS-CR-60 CROSCR00060**C 2.050 to 8.150 100% Fed01/STR/OT/Ross~|~21 - Safety~|~9B7EBE3406FB6FBAD71861678F5401CB88D03E55 120192~|~1~|~1~|~01/STR~|~Sidewalk Replacement and ADA Compliance Updates~|~21 - Safety~|~A8A834605277B04D7E1D6A77F16E2422BCC588F2 92274~|~1~|~1~|~01/BRF~|~Replace superstructure of Bridge No. CLI-CR 5-9.81 (SFN: 1430572) over Anderson Fork.~|~13 - Bridge Rehabilitation~|~7E321ADFC9E43B1E3D1B843391B472B1301D923E 93748~|~1~|~1~|~01/SAF~|~Construct a bike ramp from Broadway Street to the Wolf Creek Bikeway from Broadway Street to the Wolf Creek Bike Path in Dayton.~|~21 - Safety~|~8568EB8B5FAE8A0D6843A76B4300DC493C5B30CD 123309~|~1~|~1~|~01/IMS~|~Bridge repair project. Fiber wrap column.~|~13 - Bridge Rehabilitation~|~9BE4D8CD0C979C4ECE4A84369AEDEE70D85867A8 121698~|~1~|~1~|~01/IMS~|~Truck Parking facility on I80 in Trumbull County~|~21 - Safety~|~DEFF74019EB80853BF339FC8917D67D55171DD15 116336~|~1~|~1~|~01/STR~|~Plan Split to resurface Rural portions of WAR-132 and WAR-123.~|~05 - 4R Maintenance - Resurfacing~|~4CAC8F28C2CCB5B0E40BADD1FBC028F3EA90EBB1 116336~|~1~|~2~|~02/S>2~|~Plan split for work on Large Urban portion of SR-123.~|~04 - Reconstruction - No Added Capacity~|~FEE2DFE407AE3A20BA476BDFC4612B2AA8365C67 105224~|~1~|~1~|~01/STR~|~Bridge replacement of bridge on rural route.~|~10 - Bridge Replacement~|~836BA7DA4301384544A9062CA128312CB4BCB55F 123831~|~1~|~1~|~01/SAF~|~RPM FY2031.~|~21 - Safety~|~621B6C597EC3F6A9ACC1E9276446AB6D2FA6E2C1 102897~|~1~|~1~|~01/STR~|~Chip sealing SR 149~|~05 - 4R Maintenance - Resurfacing~|~D90F166C3DE59DD6BAA29FEF60B453B2F41E952E 101232~|~1~|~3~|~03/STR~|~Resurface FUL-US20A from 14.08 to 18.25, Rural/Other.~|~05 - 4R Maintenance - Resurfacing~|~40A6B75AE65119DBA055DB1C1B06201598FD5D5D 101232~|~1~|~4~|~04/STR~|~SFN 2600579 -- FUL-20A-14.73~|~10 - Bridge Replacement~|~43F7D2068ED729B0616A7F03AD7AA2A82813F699 101232~|~2~|~5~|~05/S<2~|~FUL-2 from 14.90 to 16.11-- Urban Paving~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~11EDA6DCAE730A452C9F2FF5616E2E2441A12565 101232~|~2~|~6~|~06/NFP~|~100% City Plans split for Curb and ADA Ramps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~55BD0F3E30E14269E42632A963972BA91B2CB9A5 101232~|~1~|~2~|~02/S<2~|~Resurfacing FUL-US 20A from 12.49 to 12.81 and 13.06 to 14.08 Urban/Other~|~05 - 4R Maintenance - Resurfacing~|~AAE571D9C829637AFFBBE47DE3563957732CEC99 101232~|~1~|~1~|~01/S<2~|~Resurfacing FUL-US 20A in WAUSEON :12.810 to 13.060 - Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~23A982F52223B4442E720ADD6E84FB5604C79DB2 101232~|~1~|~7~|~07/SAF~|~Plans split for Safety funds to install Centerline Rumble Strips~|~21 - Safety~|~BAEE362181647BF48B579497CD5A19FF5AA4824C 101025~|~1~|~1~|~01/SAF~|~Install traffic signals at various locations in the district. This will include LED replacement for the entire district.~|~21 - Safety~|~17B1D515E286F17C4055D211CA20A87ADAA74B09 122879~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~6964DAB667CA1813FBA7D03D37B570697446C7E8 101979~|~1~|~1~|~01/SAE~|~100% HSIP funds from the CEAO. Guardrail is eligible for 100% federal funds. Funds needed over the CEAO cap will be provided by Allen County.~|~21 - Safety~|~62448511B1C70B1BD5E41ED6F1DD639024FE105F 114786~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4.~|~21 - Safety~|~B08AB17903FF97E551199D3A52F7BA4E30287240 91097~|~1~|~3~|~03/SAF~|~1st Priority is 100% 4HJ7 safety funds for long line pavement markings r-wr optics and grooving. 2nd Priority is 80/20 4PF7/4PS7 for the long line pavement markings without the r-wr optics and grooving~|~21 - Safety~|~9C233D4AC540FB986601B2134C82B178BE4275D1 91097~|~1~|~2~|~02/BRO~|~Bridge Maintenance Work for Structures:CRA-US-30 20.780(R) - SFN 1701878 - OVER CSX RAILROAD Preventive Maintenance ? Deck Sealing (051) Reactive Maintenance ? Deck overlay(asph) (041) Minor Rehabilitation ? Bridge railing upgrade/repair (061) CRA-US-30 20.790(L) - SFN 1701851 - OVER CSX RAILROAD Preventive Maintenance ? Deck Sealing (051) Reactive Maintenance ? Deck overlay(asph) (041) Minor Rehabilitation ? Bridge railing upgrade/repair (061)~|~13 - Bridge Rehabilitation~|~26E8BA3797A97606AADF8933F46E8FD53BE05A1D 91097~|~1~|~1~|~01/NHS~|~Work for Roadway, Pavement, etc. CRA-30-15.80 to 22.21~|~05 - 4R Maintenance - Resurfacing~|~71E87D034355020D8E05936DFC5691C08F312779 91097~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~2FA47C62F5E2B7C638DC893F67AE9C2644D67CA3 92010~|~1~|~2~|~02/NHS~|~7101112 District 9 19.420 7101147 District 9 19.420 7101201 District 9 21.050 7101171 District 9 21.050~|~05 - 4R Maintenance - Resurfacing~|~7140D786EB24ACD0CC528424EDBEE122B50621E5 92010~|~1~|~1~|~01/NHS~|~ROS US23 16.36 - 22.20 NHS Resurfacing Project80/20 split~|~05 - 4R Maintenance - Resurfacing~|~E23FE7A8A8A1FCD2682CD2763CF95794DDB804A6 89274~|~1~|~1~|~01/S>2~|~Split for urban paving eligible work in multiple cities. ~|~05 - 4R Maintenance - Resurfacing~|~5CFC5371DF16105A1367BDEAAD5696F90CFE9739 89274~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~DBB443AA1A5B5B975255F46531E52DA4E612F607 124811~|~1~|~1~|~01/NHS~|~Bridge work throughout District 5.~|~47 - Bridge Preventive Maintenance~|~098A600FC88FAD6CAEB1E26BF5A93501CC645EDB 119618~|~1~|~3~|~03/IMS/KY~|~Repair Daniel Carter bridges.~|~13 - Bridge Rehabilitation~|~6A9DE13C59147308A9A6EF45348BB93DAD6803FD 119618~|~1~|~2~|~02/IMS~|~Daniel Beard SB Cable Painting Project led by KYTC~|~13 - Bridge Rehabilitation~|~CB49A6ED30B9C07A6ECFEE5B2B67FFC2431A34B5 119618~|~1~|~1~|~01/IMS~|~Daniel Beard NB Cable Painting Project led by KY using 100% State Major Investment Funds (4RA7) ~|~13 - Bridge Rehabilitation~|~1967A6FF015C5D8849A18D884DB02F29EE433B42 108181~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER Event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0D95C97C2626B932E359A92E88F3D41EA684542E 109740~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~C125E00EF7F334F34D5BC33F93AF8A0CA113CF93 109740~|~1~|~2~|~02/S<2~|~AC overlay without repairs~|~17 - Construction Engineering~|~F35ADC26CAD87E7C918957669943C785231848A7 102418~|~1~|~1~|~01/S<2/COLU~|~Resurfacing, urban paving in the City of Columbiana~|~05 - 4R Maintenance - Resurfacing~|~1BE73C7C2B844E1F60456FC16A325DD65B396AFC 102418~|~1~|~2~|~02/S<2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~94FD54CC864A33CEA911096FF90A66E10F1CC41E 102418~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~58C0500A3D125A7D8BC37ECFE4E329069C983958 102418~|~1~|~4~|~04/S<2/COLU~|~Full and partial depth repairs and curb ramps within the City of Columbiana.~|~05 - 4R Maintenance - Resurfacing~|~D9348EC5B45982CD41EF7AD4CB97394D2FEB5D29 115664~|~1~|~2~|~02/SAF~|~Planning for pedestrian safety improvements in front of Vinton County High School. VIN 50 16.57-16.72.~|~21 - Safety~|~AD8E821CF023C0167BCF72BDBC408D70DBBBF4AA 115664~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. VIN 50 10.68-22.80 and HOC 56 4.41-9.44.~|~05 - 4R Maintenance - Resurfacing~|~6E97570397A169B56D0993B37B9FF6A6100C44A2 102749~|~1~|~1~|~01/S>2~|~This plan split is for bridge repair on the HAM-127 bridge~|~13 - Bridge Rehabilitation~|~DB004E5B44B1A641591390BBCCA54C2D39F8C840 118402~|~1~|~1~|~01/NFP~|~Bridge Deck Sealing Project. ~|~47 - Bridge Preventive Maintenance~|~10C2B70730BB38DFC4007A5314F7C5C2C9CD00C4 98481~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State). Federal rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~532F425D39868F87A44B3FEF74A5BF244463E780 125610~|~1~|~1~|~01/S5K~|~Resurfacing SR 14T~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2BCCFD276E6BC8F41A994B1D1E432488E6846CD4 125425~|~1~|~1~|~01/SAF~|~RPM FY32 plan split.~|~21 - Safety~|~72F2FF2DC791709771306C4E793030FAF4797E45 114591~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 13 0.46. Work includes a drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FCB941CBEDC7314D8B37B3838122957648A5CF76 88695~|~1~|~1~|~01/NFP~|~District wide general project and bridge painting inspection for FY2015/2016~|~17 - Construction Engineering~|~15CB1CC6888F7A31C01F85247B2652A360F35D86 106089~|~1~|~1~|~01/NHS~|~ROS 23 2.50 ROS-002~|~21 - Safety~|~7E5F2949933A2AAA199EFA1FA280F43E8CCE8105 95511~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue-SR 285-00.00 to 07.92~|~05 - 4R Maintenance - Resurfacing~|~3972224CF0CA31EF65C50BD6C42872138AB38032 95511~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Gue-SR 285-08.35 to 13.46~|~~|~4FFA6D702A5058A03F9AB55F98C5950CB0730EB0 123512~|~1~|~1~|~01/NHS~|~Plan split for all work associated with LUC-25-0837L bridge.~|~13 - Bridge Rehabilitation~|~4BCDC5B01B430D35F4B94E00D5EEE5347E674E7B 106914~|~1~|~1~|~01/SAF~|~Plan split~|~21 - Safety~|~EEDC0068FD79579B9B6DDAB01F34668F727EAFD2 94626~|~1~|~1~|~01/NFP~|~Replacing raised pavement markers throughout six District 4 counties.~|~21 - Safety~|~A826B43AC0364AD16A967C4560DB3FBC4FE393CA 108716~|~1~|~1~|~01/STR~|~Retaining wall repair, ER Event# OH18-01, DDIR# BEL-011~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7F7669BC4BC9DF38113286EAE8D90E683C6BEC81 108716~|~1~|~2~|~02/S<2~|~Retaining wall repair, ER Event# OH18-01, DDIR# BEL-036~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DADC1037C66201CEFE54FFAE33CC3F73D6FEBC3E 93547~|~1~|~1~|~01/SAE~|~srts project~|~~|~2B4219C6D3E73B9B7407911576A90BA9D19CFCD5 93547~|~1~|~2~|~02/SAE~|~SRTS Project~|~~|~F104DAB0702CD3BD411EFB9B2859EF317C5754D6 124553~|~1~|~1~|~01/STR~|~Bridge Rehabilitation including deck joint replacement, partial painting and deck sealing~|~13 - Bridge Rehabilitation~|~AE536C801AE09F476EDA13E9FCEABDE522CB3B92 115155~|~1~|~1~|~01/NHS~|~Roadway full depth reconstruction including storm sewer and aggregate base. The project will also include the installation and replacement of sidewalks and the replacement of traffic signals at the intersection of Woodman Dr. and Eastman Rd. ~|~04 - Reconstruction - No Added Capacity~|~589F43D10F22D9FDEA383ECB27CCD40F407745A7 107717~|~1~|~1~|~01/STR~|~SFN 8707170 overall length 12 feet.~|~04 - Reconstruction - No Added Capacity~|~7CBE7D543E5B922301D267C99B479FAD6AF50D63 102994~|~1~|~1~|~01/NHS~|~Bridge deck overlay (concrete) on GAL US 35. GAL US 35 1416 L (SFN 2701111) R (SFN 2701146) and GAL US 35 1425 L (SFN 2701170) & R (2701200). NHS route, 80% Federal and 20% State funds.~|~13 - Bridge Rehabilitation~|~B0C39F97A6745167D46091659327A04C9EC959CF 92325~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 329 16.79, SFN 0503665. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~C6E4524703FAE161E2336FEA9BA8B3B49FA87B5C 106547~|~1~|~1~|~01/IMS~|~Demo Plans Split~|~44 - Other~|~919392753299BEF390043BF135379AE5D6C5EB32 100852~|~1~|~1~|~01/NHS~|~ROS 23 8.39-12.82~|~05 - 4R Maintenance - Resurfacing~|~3C4FDC42F0C69F2033E5047D048316EE1AA6883E 105633~|~1~|~1~|~01/STR~|~Plan split for sign replacement~|~44 - Other~|~B8B166F8D516A80E7CC5DCF0B47ED9DE87F3F1CB 102499~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP) -"Fast dry pavement markings on Routes in District 5 in FY 2022~|~21 - Safety~|~92D94418D12241C481413CDEA88F85CC89C0377E 116374~|~1~|~1~|~01/STR~|~Resurfacing SR 171~|~05 - 4R Maintenance - Resurfacing~|~1DFC1B9084D0AA7498DADABAE4B4BB6783B6BEAB 102200~|~1~|~1~|~01/STR~|~ADA CR 100 3.43 ER Slide repair.~|~~|~FC12061E8CFD69FEA3096175644E680FE513005F 93183~|~1~|~1~|~01/STR~|~Remove and replace existing latex modified concrete overlay with new deck overlay system and reface both abutments with annodes replaced and tops of abutments patched with overlay on SFN 1900129 DAR US 36 0436 over Spring Branch,~|~13 - Bridge Rehabilitation~|~00643921A0097E5FF4069A21A4D9104BF63F2CF9 93183~|~1~|~2~|~02/S<2~|~Remove and replace existing latex modified concrete overlay with new deck overlay system on SFN 1903128 DAR SR 502 0901 gas line anchor clips also repaired.~|~13 - Bridge Rehabilitation~|~ABF6E563C8DA567C4D97C7A533B5268915A9DAB2 105626~|~1~|~1~|~01/S>2~|~Resurface rural route - MIA CR 25A SLM 18.16 to 19.60~|~05 - 4R Maintenance - Resurfacing~|~9A0F277B8D42688A92BFCC6715AFE193BF35591B 105626~|~1~|~2~|~02/STR~|~Resurfacing on rural route: MIA CR250A SLM 19.60 to 20.92~|~~|~8AC421AD45EDB4402AA372DE8B9AAAA1CADF4040 89714~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for use with all items of work eligible for enhancement funding. MPO enhancement funds.~|~28 - Facilities for Pedestrians & Bicycles~|~43568B56C6AE60D28B1FA40A680A5DEED73AFB52 89714~|~1~|~2~|~02/ENH~|~100% local split for items not eligible or funded with enhancement money.~|~~|~D06AE3224EBFE7941E72AE4951DCAB09C5B01EE5 124010~|~1~|~1~|~01/NFA~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~01C7B62CB61D1EA7BF3D7F0EDC4825E97C352645 82295~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an AC Inlay (Mill/Fill) treatment. HOC 33 0.00-4.21 (EB and WB). NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2D6B995FD011C91BF634FDCD7BD1CE8A874469E7 82295~|~1~|~2~|~02/SAF~|~Lengthen EB left turn lane and add a new WB right turn lane on HOC 33 2.38. Funded 90 federal/10 state.~|~21 - Safety~|~4FD4BB2BDE827DC2038C3BBF7EC0BA642C161712 102903~|~1~|~1~|~01/SAE~|~Pavement markings on various Richland County roads.~|~21 - Safety~|~E2DEB234B2A697509CCBCD3C216F53A83E8E5923 125060~|~1~|~1~|~01/NFP~|~Resurfacing various park roads.~|~05 - 4R Maintenance - Resurfacing~|~C553A195C129B630CB0D1BF293E69A3C48C873B3 123404~|~1~|~1~|~01/STR~|~Resurfacing SR 212~|~05 - 4R Maintenance - Resurfacing~|~D77D4E98F40A5FBB3A84D91C7BDCC729C34182A0 123704~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 684 0.00-3.88.~|~05 - 4R Maintenance - Resurfacing~|~F539F2FAEE56839C5D8E271CD1EAAC6B143D0F5B 105755~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid~|~13 - Bridge Rehabilitation~|~06865677B45653352E3869DFEC58B4918DBBB00D 123800~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~527149013084FC35E8FF65FF8BA75D6F4D6281A2 123800~|~1~|~1~|~01/S5K~|~stp 5k-49k~|~05 - 4R Maintenance - Resurfacing~|~E9908EF3A0906A8A8401AA5B298F5BB172DFAB68 100570~|~1~|~1~|~01/STR~|~Resurfacing HOL-39 and TUS-39 with microsurfacing, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~A2E9CEF69C77AC33AEA05673ED16374B92C3639A 117792~|~1~|~1~|~01/SAF~|~Roundabout construction. All work included in this split.~|~21 - Safety~|~69944B8AE3DA13D13563D219C659B3A33510D26E 126063~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~5C85217B1577BA9F914C514DC4B410E1EC82D22C 91959~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of BEL-331 from SLM 5.35 to 5.85 and from SLM 9.95 to 14.42 including pavement repairs and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~FBA3C0D9C5E09735CC9ED78A5171496CC88F2928 117225~|~1~|~1~|~01/NHS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~D4D15CB4AC2D27ED5083FE71E7E3E2EE71636F91 125747~|~1~|~1~|~01/ENH/NCAN~|~Sidewalk replacement, widening with decorative street lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~257294FF59973BE786AE7FBDC3CA79FEF96CED4F 123599~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over multiuse trail.~|~10 - Bridge Replacement~|~F7B98E75B3948359C63F1B81DBF4537DA04C9B9E 101285~|~1~|~1~|~01/STR~|~Plan split for WOO-64 and WOO-582~|~05 - 4R Maintenance - Resurfacing~|~B64E6F10CB12F290EECE206ECC40B2714AF4A18E 101285~|~1~|~2~|~02/NFA~|~Plan split for resurfacing SR-18 in Henry County~|~05 - 4R Maintenance - Resurfacing~|~B2817C881FFAE2F30B65380C448E2572034BFBD3 105636~|~1~|~1~|~01/NHS~|~Consultant CE contracts~|~17 - Construction Engineering~|~FFA2BAF3122EEFD5CF0194C41B910831DD95E456 94435~|~1~|~1~|~01/S>2~|~Bridge Replacement~|~04 - Reconstruction - No Added Capacity~|~A5833775F7F74D456BE13D5BD17681BCEAFFE73E 112490~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~19BED18958B790E0E208AEB2DAD7553022655F3F 113137~|~1~|~1~|~01/NHS~|~Maintain structure HAS-151-1443 (SFN 3402223) by replacing the parapet, patching concrete and cleaning and sealing the deck.~|~13 - Bridge Rehabilitation~|~DE014B75A3F1B9F9F0E784CF88D0E53C93BD0A74 105675~|~1~|~1~|~01/IMS~|~AC Overlay on Interstate Route.~|~05 - 4R Maintenance - Resurfacing~|~607A0A9B558A7B748D063CDF89148803A0B4050A 105675~|~1~|~2~|~02/IMS~|~Plan Split for bridge hit repairs on GRE-675-1720R after accident on 12-22-2024.~|~13 - Bridge Rehabilitation~|~5379EECEFFDBD06276ECEB46634854E4059B4C2C 118434~|~1~|~1~|~01/NFA~|~BFP Funding - 100% LBR~|~10 - Bridge Replacement~|~979318ECCE2496FE9E4F8C5F2F1CEBA457DE672F 116152~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - No Cap - 80% Federal and 20% State - replacement of existing structure MUS SR 83 7.85 (SFN 6003907)~|~10 - Bridge Replacement~|~B0A9600F39FD9EAF895FD7F0DF53698F6C98E68F 106109~|~1~|~1~|~01/STR~|~DSR BEL-004~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4985C288B75D9861BC3456244664E1DBCB877FDA 106109~|~2~|~2~|~02/STR~|~DSR BEL-005~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7273E8D773C36E7A70F656161566F1E201A241D4 112422~|~1~|~1~|~01/NHS~|~Plan slit for conduit repair~|~04 - Reconstruction - No Added Capacity~|~65F1A85EEA7B751C63D0054B7D900FAF5F22DBE7 86158~|~1~|~1~|~01/STR~|~Bridge painting project. District wide for FY 2016. 80% Federal and 20% State.~|~~|~CA410FCCA6933E6BDC13350C3B14CB47AFB4BDC6 120388~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~B7E5DD4AFE3B0A0D1938FCD257F61BE41CB82BFD 87606~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Annual contract for replacement of RPM's within District 5 on IR; US; and SR~|~21 - Safety~|~D92B39DB6B873EE42090E5943CC24874A578FFD9 93863~|~1~|~1~|~01/BRO~|~Project will replace the existing pre-stressed concrete boxbeam superstructure SFN 3133923. All work will take place within existing right of way. Structure carries Willey Road (CR-63) over Dry Fork Creek and a Hamilton County Park owned bikepath.~|~13 - Bridge Rehabilitation~|~D63BE731CE0882656C12ADAD949581437C906D73 112196~|~1~|~1~|~01/NFP~|~Districtwide RPM replacements.~|~~|~F5583F09D46F0B5778BB4A407BBB6E6C91003C99 87298~|~1~|~1~|~01/BRO~|~0101982 ADA US52 12.52 Intersect: Donaldson Creek 80 Fed/20 State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~2A2889A171A34B6479347C52028E8B0C66444A67 84154~|~1~|~1~|~01/MPO~|~CSX Railroad Bridge over Eldean Road - grade separation by lowering Eldean Road and raising the existing railroad lin. Also widen Eldean Road from Two to Three Lanes from CR 25A West approximately 0.33 ,iles and upgrade traffic signal.~|~10 - Bridge Replacement~|~17AC8B113DEA6BC1E1FB8D95476F9AF1DC19E323 116593~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban Portion of WAR-42~|~05 - 4R Maintenance - Resurfacing~|~02BB9814DA3747A1D9ED80DECA5F97EBDD137B21 116593~|~1~|~2~|~02/S>2~|~plan split for the bridge work~|~13 - Bridge Rehabilitation~|~AA65DA5522D6A889CFB0829A81A0F109FCB9D295 88570~|~1~|~1~|~01/STR~|~SR 47-SLM 20.95 to SLM 27.09 - Microsurface SR 47 with repairsSR 274-SLM 15.24 to SLM 16.51 - Overlay SR 274 with fine graded aggregate in Jackson Center.~|~05 - 4R Maintenance - Resurfacing~|~0C5C788C60EE935A30C69CEBEE7DBE229C389D64 113565~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~~|~4314B4D8D87C45132B08861AF78538EDF603D152 97717~|~1~|~1~|~01/MPO~|~Resurface Auburn Road using 80% federal MPO STP funds match with 20% Local funds.~|~05 - 4R Maintenance - Resurfacing~|~38B5E42449CDA199EAD1E58BD6A95DEC66FB6B89 116084~|~1~|~1~|~01/STR~|~Slide repair.~|~17 - Construction Engineering~|~0EA98F5A6DB60B933D9C0A217E24D91DD7DF7725 97445~|~1~|~1~|~01/NFA~|~Salt Barn at Lyons Road Facility~|~44 - Other~|~9876B1C8A372AEC59BD7D1629AA8C967C3FEFC6E 102388~|~1~|~1~|~01/IMS~|~Mowing contract.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F55E58F9A7406175955B39BECA26FAC2CF60A16E 88418~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE 260 8.77, SFN 5602467. Not on any federal aid system funded 80 federal/20 state.~|~10 - Bridge Replacement~|~C46222814261BF60BE3DE278CB443CEB118304AC 115220~|~1~|~1~|~01/SAF/HAS~|~Guardrail replacement on various county routes with 100% CEAO Safety funding (4HB7).~|~21 - Safety~|~8F82C0992DCD4450BA1C4D67E66008BE81D18674 114592~|~1~|~1~|~01/NFA~|~Landslide repair project. ATH 690 4.21. Work includes a drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3E9374746BAA8F7355E04C43CF10C8888C8A9B4A 98601~|~1~|~1~|~01/IMS~|~Plan split for bridge work~|~13 - Bridge Rehabilitation~|~E9AAE5421D6D21C4FEEF1DC66DA037E8A25EC830 98601~|~1~|~2~|~02/BRO~|~Payne over I-90~|~13 - Bridge Rehabilitation~|~0812F8706BCB0C2111FDDC3EF6C18EC079B32200 98601~|~1~|~3~|~03/NHS~|~Lorain Rd over the Rocky River at 80/20~|~13 - Bridge Rehabilitation~|~B45BA94CE5A941286368B3B1DB46BA60D49139B5 100665~|~1~|~1~|~01/STR~|~1" Fine Graded Polymer overlay of BEL-40 SLM 6.59 to 14.57~|~05 - 4R Maintenance - Resurfacing~|~DA1B76698D506B64F41BF50600B1729A5E431DB2 100665~|~1~|~2~|~02/S5K~|~Asphalt resurfacing from SLM 16.95 to SLM 17.64~|~05 - 4R Maintenance - Resurfacing~|~CB6C1C74E72794B966A717F838EBCF45DAA61A75 89047~|~1~|~1~|~01/ERD~|~Earmark funding for use on the subject project. These funds will be the first priority.~|~03 - Reconstruction - Added Capacity~|~6D383C6EDD0E3E16167BD86DFB556B8F1E8596DD 89047~|~1~|~2~|~02/S>2~|~50/50 fed/local funding split for for the balance of the work after the earmark has been used. MPO STP funds.~|~03 - Reconstruction - Added Capacity~|~D08A0817F351F44884730D2540CA769C899410C2 91807~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - 1601059 COS SR60 20.07 Intersect: Killbuck Creek; BR Eligible for Rehabilitation: Length=252 SD/FO(1) SR=86.9 DSR=3~|~13 - Bridge Rehabilitation~|~039221482B4661FCAEB17449C8B435B31CD167D8 100241~|~1~|~1~|~01/MPO~|~Repair and resurface SR-175 using MPO STP funding.~|~05 - 4R Maintenance - Resurfacing~|~3F7FDAA85683A44DE8B6B15C548B97834ED5C4C9 113763~|~1~|~1~|~01/NHS~|~Systematic Sign Replacement~|~44 - Other~|~C5BD95521EC9B87BA0B32584E8E2B82F4AF529AA 93238~|~1~|~1~|~01/MPO~|~Replace obsolete traffic signal controllers, aging conflict monitors and the central software with next generation items within the City of Dayton.~|~21 - Safety~|~037B191BA918190803BA55D7FB4D4E214CC16B45 113098~|~1~|~2~|~02/S>2~|~Minor bridge rehab > 20' span.~|~~|~E5396C8F5EBEE80BAA7D5FF0AE704A0C8004F5DE 113098~|~1~|~1~|~01/S>2~|~Resurfacing of STA SR 236 from 2.05 to 5.50.~|~~|~702AAEA4D1065046E6CB3D2DDA4103ABD07120E0 99051~|~1~|~1~|~01/ERD~|~Construction of new roadway along White Pond Drive, in the City of Akron, Summit County, Ohio.~|~01 - New Construction~|~D36311E8D43A8434ABBDC5E3AFFFC0B0DED33017 116397~|~1~|~1~|~01/NFP~|~Spot paving ~|~05 - 4R Maintenance - Resurfacing~|~45F444F0B0A6CBCA3FE867E67A96CDE9F81DF6B0 98769~|~1~|~1~|~01/S<2~|~Improvements to Blue Ash Road between Matson and Galbraith including rehabilitation and repair of the existing pavement, storm water improvements, water quality features, on-street parking reconfiguration, and traffic signal / RR pre-emption improvements.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~051674C753912D838AF45082065505ED2BFB8ACA 98769~|~1~|~2~|~02/ENH~|~Improvements to Blue Ash Road between Matson and Galbraith including installation of lighting, sidewalks, and bus shelters.~|~28 - Facilities for Pedestrians & Bicycles~|~6C1C242141504E8143C793F54B7383526BB3E0D1 98769~|~1~|~3~|~03/NFP~|~Installation of water line though the project limits as part of this construction contract.~|~43 - Utilities~|~A845D55331B11982B80950CA2E756EEE94D8C731 98769~|~1~|~4~|~04/NFP~|~Split for hydrant relocation that is 100% local cost to the project and paid by the City, not GCWW.~|~43 - Utilities~|~D0C510C085D79DB6136416AF60422CFD231AA3D4 100352~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~9B66BDF1B58CFF3AE2F9CA4D60C0E4E062288A15 115129~|~1~|~2~|~02/NFA~|~Culvert liner project. WAS 260 3.22 (CFN 1803756).~|~04 - Reconstruction - No Added Capacity~|~80B4AA0208DC191064C12F06632D79C26BFC6859 115129~|~1~|~1~|~01/STR~|~Culvert liner project. WAS 26 19.32 (CFN 1880790). Culvert Liner WAS 26 24.14 (CFN 1880839)~|~04 - Reconstruction - No Added Capacity~|~F6F47D13A49237A04B5EDF9F4AABDF3C82CAAE85 108010~|~1~|~1~|~01/IMS~|~Lighting~|~21 - Safety~|~9F7334C7714200F5C30971E97DA5E4067FFFBB7F 88872~|~1~|~1~|~01/STR~|~General system preventative maintenance on various routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D56C23B71BE96F9905784FE51F2C5134D1BB362 94332~|~1~|~2~|~02/STR~|~Rural Major rehab section (SLM 1.51 - 7.03)~|~04 - Reconstruction - No Added Capacity~|~FD263858A5C0605B9F46F64CA720F94A551A4F6B 94332~|~1~|~3~|~03/BRO~|~Structure work~|~13 - Bridge Rehabilitation~|~D8E0D56CE0A740A438FA3371D518A7A81D31D52A 94332~|~1~|~1~|~01/S5K~|~SR-510 in Clyde Urbanized area (SLM 0.83 - 1.51)~|~04 - Reconstruction - No Added Capacity~|~ED1D8CEA5B2035FD72DC3A0659093CDD9C738C27 94332~|~1~|~4~|~04/S5K~|~Plan Split for Part 1 Urban Paving funded work in Clyde from W. Maple Street to north Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~4FBF6F4DA8A8EA8BDB46A31EED1D2701FD7F8534 94332~|~1~|~5~|~05/S50~|~Plan Split for 100% locally funded work in Clyde (pavement repairs, spot curb replacement, etc) associated with Part 1~|~05 - 4R Maintenance - Resurfacing~|~7735794B8805B77B6A50C20975BDEFE0852782A1 110933~|~1~|~1~|~01/S>2~|~Plan split for eligible urban paving items on the Urban STP system~|~05 - 4R Maintenance - Resurfacing~|~35989B85606ECE7953F9B41AA15E4515934B9112 110933~|~1~|~2~|~02/S>2~|~Plan split for non-eligible Urban Paving work items at 100% Local Share~|~05 - 4R Maintenance - Resurfacing~|~7AFF9658118AE4DC7BED3E2E95A7A6B533253579 99540~|~1~|~1~|~01/NFP~|~Plan split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~317EEBE20435D151E98411EBD029E5DF79327934 108667~|~1~|~1~|~01/NFP~|~All work in this project.~|~~|~185E07E86259EE813E451F8CA968A0A204031315 95577~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation - CRA-100-22.23~|~13 - Bridge Rehabilitation~|~405B37284468EE84830679D8756A25E9897BA975 83924~|~1~|~1~|~01/BRO~|~PIK SR335, SFN 6603092, 21.65 Intersect Wilson RunBridge Rehab, Eiligable for BR funds.80% Fed/20% state~|~13 - Bridge Rehabilitation~|~0D1BC4E1FA95F5182271DE20743B8D88DFCE4A29 83924~|~1~|~2~|~02/BRO~|~PIK SR335, SFN 6603068, 21.51, Intersect Wilson RunBridge Replacement, Eiligable for BR funds.80% Fed/20% state~|~10 - Bridge Replacement~|~8B193A27C97275159568FF8FC5CDF7D9E9E3C9DF 112898~|~1~|~1~|~01/STR~|~Culvert replacement.~|~05 - 4R Maintenance - Resurfacing~|~98A039420991D56BEAF483BAD51C24E1CC3E255B 93583~|~1~|~1~|~01/IMS~|~Type A emergency fix to stabalize an embankment/culvert failure.~|~04 - Reconstruction - No Added Capacity~|~2C4A9F16E850C8FF671821F6D1712D26CE369C59 93583~|~1~|~2~|~02/IMS~|~Type A emergency project to stabalize an embankment/culvert failure.~|~~|~E19572035269B4E10CD3425668C218B4ECB13C8F 92684~|~1~|~1~|~01/S<2~|~Work inside the Delphos Urban Area but outside the City of Delphos. All funds from the District Preservation Program Budget. No local government funds. On SR 66 in Allen County from 10.49 to 10.58 on the right side of the road. On SR 190 in Allen County from 1.27 to Putnam County line on the left side of the road and from 1.26 to 1.30 on the right side of the road from 1.26 to 1.30 and from 1.32 to the Putnam County Line.~|~05 - 4R Maintenance - Resurfacing~|~CCA13C5F95B84B7441AC2C96B3E53AAA01E42BFF 92684~|~1~|~2~|~02/S<2/DELP~|~Paving work inside the City of Delphos. The federal funds are from the District Preservation Program Budget. The 20% non-federal match will be provided by the City of Delphos. All work on SR 66 in Allen County on the left side and all work on SR 66 in Allen County on the right side starting at 10.58. All work on SR 66 in Vanwert County on both sides. Work on SR 190 from 1.26 to 1.27 on the left side and 1.30 to 1.32 on the right side.~|~05 - 4R Maintenance - Resurfacing~|~FCF6923AEF1BD782F2D92F67622E591A21F6520E 113270~|~1~|~1~|~01/MPO~|~Split for MPO-funded multipurpose path work~|~44 - Other~|~8EC22A809C9397E0B72BBF01F714154619BAA8A1 98181~|~1~|~1~|~01/STR~|~Replacement of two culverts in Holmes county.~|~04 - Reconstruction - No Added Capacity~|~751CAB7E95D7B980523E215D62F0399F59099E3A 102495~|~1~|~1~|~01/IMS~|~IR 77 20.73 to 27.72 Double Micro~|~05 - 4R Maintenance - Resurfacing~|~995981B765035FACFAC5976502CF5DCBD311F707 102495~|~1~|~2~|~02/NHS~|~US 250 11.88 to 12.79 Double Micro~|~05 - 4R Maintenance - Resurfacing~|~AA27C0E2D4A361FF61DEE714320273ABF74279D1 97446~|~1~|~1~|~01/SAF~|~2" asphalt overlay of CR 19 (Monnett-New Winchester Road) from CR 40 (Winchester West Road) to SR 100.~|~05 - 4R Maintenance - Resurfacing~|~DFFC6AFDCC10D72E2A9789DEBAA7E98E9351CEF6 118952~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding~|~21 - Safety~|~B0980A0C776F88E83D0FB7877732DB16E1641F7B 114972~|~1~|~1~|~01/STR~|~All work in this plan split using district preservation allocations, SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~F4C946E0E0D11BA63D5935AB4AE1DCAA3F83CCFE 92341~|~1~|~1~|~01/BRO~|~Concrete simple support bridge removal and replacement with minimal approach work on SFN 1903780 DAR SR 705 0582 over Branch Ward Ditch.~|~10 - Bridge Replacement~|~13949B6986EAB1FC4E793938DB925E7DBE2F2036 92341~|~1~|~2~|~02/STR~|~SFN 1903780 DAR 705 0790 over Bear Creek single span concrete slab deck removal and replacement with minimal approach work. Possible precast structure replacement.~|~10 - Bridge Replacement~|~7E17F5EAF3B2D78E724B515D8F0F0EDA6D5520BA 96300~|~1~|~1~|~01/STR~|~District 9 FY2017 Guardrail Project. Guardrail replacement in various locations along route segments. ADA 125 17.50-22.48BRO 62 28.08-30.08BRO 68 20.45-21.63 BRO 68 23.05-24.04HIG 50 18.87-20.33HIG 50 21.58-21.62ROS 50 6.25-6.70ROS 50 10.28-11.31ROS 180 1.29-4.57ROS 180 9.73-10.15~|~21 - Safety~|~A44CCE81A3A0CF498F2D9F486D79318A147C0E2F 96300~|~1~|~2~|~02/NHS~|~District 9 FY2017 Guardrail Project. Guardrail replacement in various locations along route segments. BRO 68 13.36-16.01~|~21 - Safety~|~CE7667C099F5D8A6AA0F0E1E9F6BCEC397781C8F 96300~|~1~|~3~|~03/S<2~|~District 9 FY2017 Guardrail Project. Guardrail replacement in various locations along route segments. ROS 180 0.76-1.29~|~21 - Safety~|~7CB2794778F0B9AB8304D5491DC0C1F6B35D6AA3 118871~|~1~|~1~|~01/STR~|~Resurfacing SR 93~|~05 - 4R Maintenance - Resurfacing~|~34562B1ACE4D98D5FA488C7C332E029B72A70F76 118871~|~1~|~2~|~02/NHS~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~F6E93C2CC06E51F87125A10F02194BDBD1B22364 101127~|~1~|~1~|~01/IMS~|~Systematic sign replacement at various locations throughout District 2.~|~44 - Other~|~270DE699E5EC0D7FA8A3BE5B5479109C3D4C19A0 124774~|~1~|~1~|~01/SAE~|~100% CEAO HSIP (4BH7) for eligible expenses~|~21 - Safety~|~716F94D70314A1E2A812E9E8276E2E75A52B466F 114008~|~1~|~1~|~01/SAF~|~All costs to construct the overpass. Federal funds from the ODOT Safety program with a local match from Hancock County will be used first. Federal funds from the CEAO Safety program with a local match from Hancock County will be used next. After the cap is reached funding will be from the District Preservation Program budget.~|~08 - Bridge - New Construction~|~059C39FFD7BEA82C6362D0BA853BE80A05F08E2A 125870~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~09E4E39A6878B3E50530D4635A6D9A3AF3AABD3F 125870~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~D012F321486F919FD92CB423102358450DAD9151 101041~|~1~|~2~|~02/STR~|~TRU SR 46 15.66 to 18.45TRU SR 193 17.78 to 22.85TRU SR 534 5.67 to 7.94~|~~|~C6F74F5F06068AE48CD38BE8A7522D84D4ACE545 101041~|~1~|~1~|~01/S>2~|~TRU SR 534 from 5.25 to 5.67.~|~~|~156A8E5FF034918822B3747133798FCB1123E252 78163~|~1~|~1~|~01/S<2~|~General system resurfacing on DEL-42 from SLM 9.51-13.26, in Delaware urban areaIncludes asphalt overlay on 1 bridge:2101912 DEL US42 11.55 Intersect: Sugar Run01/S<2/PV/~|~05 - 4R Maintenance - Resurfacing~|~0F2120A718D4B87DE1C959952F7B2244D432FBC2 78163~|~1~|~2~|~02/STR~|~General system resurfacing of DEL-42: 13.26-19.17, in rural area02/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~2617F888CBDB9417CF0D9F84DD69EC37177585F0 106822~|~1~|~1~|~01/NFP~|~Statewide ITS maintenance contract~|~44 - Other~|~E3C705B4F013FC6D70D10919D1223025864D2561 24975~|~1~|~1~|~01/NHS~|~Clean and paint two bridges (TUS-250-2251 L & R, SFNs 7900600, 7900635) with system OZEU.~|~13 - Bridge Rehabilitation~|~05149AA7BDCBE0B6041CF14B984CD54B27D90B0A 121059~|~1~|~1~|~01/S5K~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~BB4C091395E0104382E174BD03F1D735E0FF00C1 121059~|~1~|~2~|~02/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~6ADBEDB4EC9AAA6A0024D0C250E09516934E30E0 121059~|~1~|~3~|~03/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~CE398032FE0E80FF115664CBB15749B7E7B67F48 119963~|~1~|~1~|~01/NFA~|~Created for possible J&C inivovlement~|~44 - Other~|~EAE6E20BBCDED7753F788ABA9B503DA380F6F972 121520~|~1~|~1~|~01/SAF~|~Signal & lighting replacements~|~21 - Safety~|~F23D733C23662C42D6125D2D7E44E7A546F00C87 107016~|~1~|~1~|~01/NFA~|~Reconstruction and improvement of Traxler Drive from County Road 15 to US route 20A~|~01 - New Construction~|~017D0345F212A2E68B68F922F6FED9213E7909B4 95433~|~1~|~1~|~01/NFA~|~It is proposed to construct a salt shed at the Wilgus Outpost in Lawrence County.~|~44 - Other~|~55AE7B350681B0F0A8AA1B2986748E88D4D37EA7 110384~|~1~|~1~|~01/S<2~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~16B8F88CD18F5DCC075370EE8054F3CECA04CDFB 126270~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2F8FF45FE6EC30797277F5E25D55D886FA08B597 94529~|~1~|~2~|~02/NFP~|~Culvert CFN 501650670 MAH-165-25.61 when replaced will become a structure SFN 5010000, Install pressure relief joints to the following structures...SFN 5000661 MAH-11-13.02 under New Road and SFN 5007577 MAH-680-9.90 over Midlothian Blvd.~|~44 - Other~|~2DBD1B97A57E99C12DA2C6231BD83B0D6F8A7FB7 94529~|~1~|~1~|~01/NFP~|~Culvert replacements in Mahoning County, Ohio. MAH-14-8.25, MAH-14-10.00, MAH-46-12.57, MAH-62-12.22, MAH-165-19.91, MAH-165-21.34, MAH-616-7.15.~|~44 - Other~|~E8C091790C6CA29C2418E32C7D2FEBD7D24A5AF2 93773~|~1~|~1~|~01/STR~|~Reface abutments with anodes, haunching out at top to cover deck spalls along abutments, encase pier columns, patch/rebuild wingwalls with anodes, correct erosion at wings, and seal longitudinal joint on wearing surface on SFN 0601268 AUG 66 1981 Prairie Creek.~|~~|~BF38272C4A678D0AC9EADF8A4706BD415EDDDFA4 123814~|~1~|~1~|~01/BRO~|~Plan split for bridge work on HEN-109-0957 & HEN-109-0988 bridges~|~13 - Bridge Rehabilitation~|~B2CFF9770DC2F5C58398FFD31FEE472C21DFBB79 98786~|~1~|~1~|~01/NFP~|~Replacement of culvert #780050350 (TRU-SR5-5.09) via Emergency A contract.~|~44 - Other~|~DE4DE59914E7E8199EEE1E1E3772E996542853A1 92683~|~1~|~1~|~01/S>2~|~100% State District Preservation funds for Construction Inspections~|~17 - Construction Engineering~|~9CF8211BE51A9B37FBA56609D9590785B64AA2F2 101642~|~1~|~1~|~01/NFA~|~Type C Emergency project to replace a bridge destroyed by flooding. GAL CR 114 2.05, SFN 2738937. Not on any federal aid system funded 95 federal/5 local.~|~10 - Bridge Replacement~|~BBE99108A4A7CA9A83F24F40C885F835751595CB 93248~|~1~|~1~|~01/MPO~|~Widening approximately 2,000 LF of roadway by revising the existing roadway from 2 to 3 lanes (36' wide). An 8' sidewalk/bikepath will be constructed on the North side of the road along with curb and both sides on Chambersburg Road beginning 280' East of Brandt Pike (SR 201) and ending at Evergreen Woods Drive.~|~03 - Reconstruction - Added Capacity~|~0D0EEFCA5A5C9FD1614B6C84D5666EBE0D2C9F9C 123891~|~1~|~1~|~01/NHS~|~Conduits linked to plan split~|~04 - Reconstruction - No Added Capacity~|~A290D4AF043240097B37262831D92181EA31B509 103779~|~1~|~1~|~01/NFA~|~ADA CR 6B 15.72 (SFN 0132705)~|~10 - Bridge Replacement~|~C0D3F9ECA8F6FA8A6BCE9E52C1ED72A3177C9EFA 103779~|~1~|~2~|~02/NFA~|~Replace the Mineral Springs Road Bridge (SFN 0133019)~|~10 - Bridge Replacement~|~FD4059FAFC200CA52A13A11CE321DB18F699A3EC 122409~|~1~|~1~|~01/NFP~|~Pavement markings through District 12~|~21 - Safety~|~E23293403E884FDC3214BBA5A947B25E8518BA45 114898~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~16F0BE454BAA6334B28EA6A66711A1994C9EFEF4 125508~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~8E857A5E292166C212A32DBFB79E983E83A8221B 80681~|~1~|~1~|~01/NHS~|~Widening of SR43 from 55th Street to Applegrove.~|~~|~3CA9BA123BA533CEC6D94860231E9ED4A13D5ACC 105696~|~1~|~1~|~01/NHS~|~NHS Route. All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~C768FDD25276D1ABABE68C9D4D452C06A8053950 113148~|~1~|~1~|~01/S>2~|~Resurfacing of TRU SR 7 5.61 to 8.41~|~~|~50B2E05DD210BDDC0CD2711C5F1E29FC1738C65D 98309~|~1~|~1~|~01/NFP~|~Auxiliary pavement marking contract throughout District Six~|~44 - Other~|~5F8A61E6653A9D7BDBBD3D92F9C292C07BFF5CDF 121754~|~1~|~1~|~01/ENH/PARK~|~Construct Headwaters Trail Phase 9.~|~28 - Facilities for Pedestrians & Bicycles~|~C891DAF820919CFAAD50C53306FD2F7A8D513E37 95931~|~1~|~1~|~01/NFP~|~40' x 200' Cold Storage building with attached Decanting Station- demolish old building.~|~01 - New Construction~|~1ED04583CEDC968A3197ED6D1940F98C3949D6EC 95931~|~1~|~2~|~02/NFP~|~New 60' x 150 fabric salt building at 6000 tons. Demo two domes.~|~17 - Construction Engineering~|~90BA4E8A46F6400AEBF24D377A5E7B4E2733B769 96645~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 50 33.36-39.04, WAS 50 0.00-4.42, and WAS 7 4.42-10.14. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A0C8C0E00AF142D00A8C0C351A8FF02B43C518EB 115212~|~1~|~1~|~01/NHS~|~AC Overlay w/o Rpr WAY SR 83 10.584 - 10.810~|~05 - 4R Maintenance - Resurfacing~|~8BB9D08AB28EDB2F9AB3C2B334CF6EC8804C9723 115212~|~1~|~2~|~02/NHS~|~Bridge work to be determined at a later date.~|~13 - Bridge Rehabilitation~|~1A826F1D870E9A8B0B6E3EB1FCC7669EB6CA0B7A 102974~|~1~|~1~|~01/NHS~|~This plan split is for NHS routes.~|~05 - 4R Maintenance - Resurfacing~|~2F68FDECF7E3ADB9B418E97090367CCCB92EC000 96425~|~1~|~1~|~01/SAE~|~Preemption Project~|~21 - Safety~|~89687FFFED1E6EC03C913FF5D4AF7E3EFB281D0F 92032~|~1~|~1~|~01/S>2/TWIN~|~Widening, including drainage, curbs, sidewalks, drive aprons, lighting from Glenwood Drive to the Cuyahoga County line, in the City of Twinsburg, Summit County, Ohio. ~|~03 - Reconstruction - Added Capacity~|~A247816C714A0D34851503CEC095DA028A5BA255 96466~|~1~|~1~|~01/IMS~|~HAM-71/275-0.00 bridges (Repair and Replace Joints on 3 Bridges) - 3107787, 3117286, 31172787~|~13 - Bridge Rehabilitation~|~88CA7EEAB2464916C4D05ED7C5A973773E861D6C 104156~|~1~|~1~|~01/STR~|~ADA 41 21.42 Slide Repair.~|~04 - Reconstruction - No Added Capacity~|~E3C70327B8473EDEACC782BC0BBB912816810979 122331~|~1~|~1~|~01/BRO~|~Replace bridge over Branch of Friday Creek. In Stream work required.~|~10 - Bridge Replacement~|~4E6572FF89A44332591117DCAFA608D7EF2632B3 121687~|~1~|~1~|~01/MPO/TALL~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8389538A31EF60B86440B952888557E705C47CCC 107238~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 376 1.32. GSM funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A2DF3B4547588AFAFCE6526596B681431D992216 99530~|~1~|~1~|~01/IMS~|~All work on the interstate funded at 90/10 fed/state~|~05 - 4R Maintenance - Resurfacing~|~E50456617779824DEC5B0CC8F8B2DBA5A18B5955 126689~|~1~|~1~|~01/NFP~|~ODNR office resurfacing and crack sealing~|~05 - 4R Maintenance - Resurfacing~|~319A736BB01168C62DF061E878F8C373D799E190 110010~|~1~|~1~|~01/NFP~|~Pavement Markings~|~21 - Safety~|~CF37116219BFA2BD10B4B239D5456B59FA64DF30 113017~|~1~|~1~|~01/S<2~|~JAC 93 27.17-28.18 Local Match -Wellston~|~05 - 4R Maintenance - Resurfacing~|~BF80CB1E41D67AADCD72FEF91EDDF39CBFF27AD9 113017~|~1~|~2~|~02/S<2~|~JAC 776 11.44-12.59 Local Match - Jackson~|~05 - 4R Maintenance - Resurfacing~|~9EDA892CEF190320F48AE3EB01EC710956547E76 124960~|~1~|~1~|~01/MPO~|~Resurface South University Boulevard between University/Roosevelt Blvd. Overpass to Lafayette Ave~|~05 - 4R Maintenance - Resurfacing~|~2B67A74D0A78BDC9203F97702FEDDFBAF0D86F3F 122333~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 212 over Holmes Run/Branch of Conotton Creek~|~10 - Bridge Replacement~|~64160CBD7B5A5EB8E7FB1A3D8DDBDA62C18952D4 119383~|~1~|~1~|~01/IMS~|~Split for barrier and lighting work~|~04 - Reconstruction - No Added Capacity~|~79173A8403309F1579F1D677ED9CDC278F295E3F 85686~|~1~|~1~|~01/STR~|~Replace box culvert over Sylvia Wilson Ditch01/STR/OT/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6640CAAC72932C2E1757F1C4355D1A24FE677851 85686~|~1~|~2~|~02/STR~|~Replace joints and sealing on structure over Glade Run4903633 MAD SR142 5.66 Intersect: Glade Run~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D61FE9C110D59BC557B54732AAEE6521AB7CFD38 111619~|~1~|~1~|~01/NFP~|~Spot paving on various routes within ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~42B75DA01C0E02F2A5A6EA9575A70DB70E79B196 79755~|~1~|~1~|~01/S<2~|~District Allocation~|~17 - Construction Engineering~|~8CE356987DB0D2888EBB8402D91C9085A535457E 96733~|~1~|~1~|~01/NHS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~6BED175B44980060D43886F9FE210D9DD9F6416D 117289~|~1~|~1~|~01/NFA~|~ODNR Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6969111753C64AC1F58B0FD30C7377479B37424E 114968~|~1~|~2~|~02/NHS~|~WAY SR 0083 10.73~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DF77D013822470080427AA7EEE75BD9BA13A7C3A 114968~|~1~|~1~|~01/IMS~|~ASD IR 0071 13.75~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F51CEEFC35049B2CF75C617E638FA9EABFF16D1 121283~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 124 40.51, CFN 1822135 and MEG 124 43.77, CFN 1866448. Culvert liner on MEG 124 40.507, CFN 1988489.~|~04 - Reconstruction - No Added Capacity~|~C5550328F8538B8E284E351D36EEAB6E024E0B7E 126657~|~1~|~1~|~01/CMQ/MASS~|~Install roundabout.~|~21 - Safety~|~0A3CAA7F03D66D86070F954DEF9E5D80F7A57B0F 115940~|~1~|~1~|~01/NFA~|~Chip seal resurfacing project. NOB CR 5A 0.00-4.67 and NOB CR 62 0.00-0.93. Funded through the Local Roads Oil and Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~019A6CEB05A93085B850D98AB3A76BB4780D9CFC 101249~|~1~|~1~|~01/NFP~|~TID is constructing the Eastgate South at Clepper Lane Roundabout~|~01 - New Construction~|~70D8D9481B082E94020C4990DBB2221BE82C2FD9 125728~|~1~|~1~|~01/STR~|~Resurfacing SR 150, 150A, 152 and 647~|~05 - 4R Maintenance - Resurfacing~|~B19DBF441736DD965C4E625C3872906C4687B04C 84619~|~1~|~2~|~02/S<2~|~Urban area JAC SR93 17.46 - 24.46 Resurfacing ProjectSLM 17.46 - 20.24SLM 22.78 - 22.98On SR93, begin at the north corp limit of the City of Jackson and end at Wellston Corp limit. Pave Thru Brdg:4001486 JAC SR93 19.61 Intersect: Trib Of Horse Creek~|~05 - 4R Maintenance - Resurfacing~|~311922575B6DFE833A82A79A22172D1C10B92421 84619~|~1~|~4~|~04/STR~|~JAC SR93 17.46 - 24.46 Resurfacing ProjectBrdg for Rehab:4001516 JAC SR93 21.32 Intersect: Pidgeon Creek80/20 split04/STR/BR/State~|~13 - Bridge Rehabilitation~|~37664AAC67CE82828048A3A45CE674A0791F6EF1 84619~|~1~|~6~|~06/S<2~|~Urban PavingJAC SR93 24.46 - 25.79 O M 781 Other Federal-Aide Highway Minor Arterial WELLSTON ~|~05 - 4R Maintenance - Resurfacing~|~4EA81E911809F793277EADF43CFDD0D868D8797C 84619~|~1~|~1~|~01/STR~|~JAC SR93 17.46 - 24.46 Resurfacing Project SLM 20.24 - 22.78On SR93, begin at the north corp limit of the City of Jackson and end at Wellston Corp limit. Pave Thru Brdg: 4001540 JAC SR93 22.64 Intersect: Trib. Of Pigeon Creek 80/20 split 01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~5C9058B3AA8F1ED62118D3D892CEF834D7D41314 84619~|~1~|~3~|~03/S<2~|~JAC SR93 17.46 - 24.46 Resurfacing ProjectBrdgs for Rehab:4000285 JAC US35 18.21 Intersect: Us 354001419 JAC SR93 18.71 Intersect: Stream80/20 split03/S<2/BR/State~|~13 - Bridge Rehabilitation~|~73EC5FF8419A459D2B45F695454C4004A13F701B 84619~|~1~|~7~|~07/NHS~|~4001605 JAC -SR -93 27.320 51.3 4001613 JAC -SR -93 27.320 51.0 Mill & Fill & new joints on both structures~|~13 - Bridge Rehabilitation~|~825F111B8757F5566B63D65189ED4BF59BF08433 84619~|~1~|~5~|~05/NHS~|~Urban PavingJAC SR93 25.79 - 28.18 N P 781 NHS Non-Interstate Other Principal Arterial WELLSTON~|~05 - 4R Maintenance - Resurfacing~|~C18EB82750CA7313000AFC23E23471B9EA0EAD25 114224~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4.~|~21 - Safety~|~ACF379B963DA4D137D36A5968DC8639597E5AD9F 125432~|~1~|~1~|~01/NFP~|~CE plan split.~|~17 - Construction Engineering~|~1C75E4B85A25712227591E2BA0C751911EE53FAC 116873~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4D789CA513DC9F29D6F43F888A511A2BAF7C3A09 98125~|~1~|~1~|~01/S>2~|~Widening for a 400' right turn lane from Grange Hall Rd to Colonel Glenn Hwy, extension of the second NB thru-lane on National Road, north of Colonel Glenn Hwy, signal modifications at Colonel Glenn & National Road, milling and resurfacing of the entire project limits, installation of curb, gutter, and storm sewer, extension of sidewalk along the east side of National Road.~|~21 - Safety~|~BAB2F3D9CB44746CC51B90AC10802A3BE03C6046 105646~|~1~|~1~|~01/STR~|~Spot repairs on Rural Route.~|~17 - Construction Engineering~|~37AA589D86A5ACEA8C744E2F7E12E75995CFFC11 107975~|~1~|~1~|~01/SAE~|~Repair of a slide along Nine Mile Road by installing a drilled pier retaining wall.~|~~|~2A0BAF017E06AFCCCF7FFAA24B0A92B16495A8EE 119064~|~1~|~1~|~01/MPO~|~Extension of the Great Miami River trail to connect the Middletown and Monroe sections.~|~28 - Facilities for Pedestrians & Bicycles~|~DFCB87C213D9E4BBC2EFD2EBA894F6C770ECEC99 123244~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7B4C586BFFCD271554AB3EBB3D23CC16D67AD68A 110713~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~45E3E02BACB593B1ACD9F42C279C1D513D11EBCA 110713~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance.~|~~|~8246EB56A9626FC3943B8C220BE6454F92F09CCA 110713~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance.~|~~|~05CA0AFEEDD31440221934E8730F8FDC8BAE162B 110713~|~1~|~4~|~04/S>2~|~Bridge preventive maintenance.~|~~|~F354AEE20C8065E9EBD71A9C229F0182B87B6A5E 110713~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance.~|~~|~235329EF15D6EA0CE121F9B5636E519D5E2414FA 124038~|~1~|~1~|~01/IMS~|~Plan split for work associated with LPA project for bridge maintenance and aesthetic improvements~|~47 - Bridge Preventive Maintenance~|~4CC61128F3C43D494DC5038E43FECA6B9F257457 102074~|~1~|~1~|~01/NHS~|~This plan split is for NHS bridges~|~13 - Bridge Rehabilitation~|~501509946DD1D19058E6A965CCD6C7E8DCC53150 102074~|~1~|~2~|~02/STR~|~This plan split is for STP rural bridges.~|~13 - Bridge Rehabilitation~|~B387FBCE314DCF32E2952E209060A82EA96FE8BC 102074~|~1~|~3~|~03/IMS~|~This plan split is for Interstate bridge.~|~13 - Bridge Rehabilitation~|~794847A9B69F14CACF1C4D442915418F10A48A8F 121688~|~1~|~1~|~01/MPO/TALL~|~Resurfacing.~|~~|~B2211CE31B2A8299C3643BB1DEA542E1AA015051 100783~|~1~|~1~|~01/S<2~|~This is for overlay work on CHP US 36 SLM 14.88 to 15.05 covered under the Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~2FAB9BBE58F60A6527100E6CC801AAD26F20F90C 100783~|~1~|~2~|~02/NHS~|~This is for overlay work on CHP US 68 SLM 6.55 to 6.70 covered under the Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~0EA9D0085469FF78370E145D1EA752281CBE01B3 96665~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 555 3.43-3.85. Not on any federal aid system. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~5B2092471EEEC2395E96E2F5EAEF8457D86471FE 96665~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MRG 377 0.00-16.86, MRG 792 0.00-5.49 and ATH 377 0.00-1.51. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2979E17F332563214698ADD0098174F9B8EC00BF 106932~|~1~|~1~|~01/NHS~|~Split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~BC5361745B3298CD0CD400EABFAF3B7269F6288D 106932~|~1~|~2~|~02/NFP~|~Work items that are 100% local participation~|~05 - 4R Maintenance - Resurfacing~|~9443D18B823147F16DF62EEDBB6DDEB7BA2AE5BB 109577~|~1~|~1~|~01/STR~|~Culvert ReplacementJAC 327 12.95~|~04 - Reconstruction - No Added Capacity~|~6DF59C2368D120550D3BE4749A35F5F2C9CE0AA3 99858~|~1~|~1~|~01/NHS~|~Remove and replace existing SDC wearing surface using hydrodemolition. Convert bridge to semi-integral abutments. Patch abutments using self consolidating concrete (SCC). Epoxy inject abutment wall cracks and seal all concrete surfaces not sealed from PID 89130.~|~~|~B6114B9859ADF3243DDA9788BFEB512DE17AB33F 99815~|~2~|~2~|~02/MPO~|~Pavement work for widening of Avery Road.~|~~|~B7B7D38959DD62FAA9CE24F058A131BC191E7AFE 99815~|~1~|~1~|~01/MPO~|~Funding for extension of Tuttle Crossing Blvd and Avery Rd. There is no difference between how the 2 funding sources should be applied CO Contr 01 is the portion funded by MORPC, Co CO Cont 02 is the portion funded by Dublin only. Both can be applied to all portions of the project.~|~01 - New Construction~|~D5CAA2CE7FAC624FCA7CEA689ABDDFC0AB48E56F 101461~|~1~|~1~|~01/STR~|~DSR# TUS-003~|~04 - Reconstruction - No Added Capacity~|~3FA5C322AD628F5D1A8C66D36DD0616157AE444F 107393~|~1~|~1~|~01/STR~|~Chip sealing.~|~~|~DE7E7BC3C23B59D32C99F151832773642BFA9705 91006~|~1~|~1~|~01/MPO~|~Austintown Warren CR 67 3.96 - 6.58~|~05 - 4R Maintenance - Resurfacing~|~912E8C21E6E541BFEBCCF5F52E9E8B7A35AA7C86 114617~|~1~|~1~|~01/NFP~|~Bridge Operation Plans split~|~44 - Other~|~20CC03BF9594128F24107F2898DB66DDE1889BD0 94068~|~1~|~1~|~01/BRF~|~Marburg Road bridge replacement over Norfolk Southern Railroad SFN: 3136744~|~10 - Bridge Replacement~|~9EB4C31D16FBE70B9D5E74DB01966DB8D3407322 112997~|~1~|~1~|~01/IMS~|~Culvert repair~|~04 - Reconstruction - No Added Capacity~|~560F2E2CD0022E2E4A92A188D3BAF6BDED2FF300 112997~|~1~|~2~|~02/NHS~|~Culvert repair~|~04 - Reconstruction - No Added Capacity~|~C6EF390C6D55463993666CD9D1338C058290B039 88497~|~1~|~1~|~01/STR~|~US-224 from SLM 0.00 to 6.2 Minor Rehab, SR587 from 11.17 to 11.43 then from 11.57 to 12.07.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~11A644C20A82B6813C9A11D7318C75DD20361620 88497~|~2~|~2~|~02/STR~|~SEN-US-224 from SLM 6.2 to SLM 10.63 preventive maintenance.~|~05 - 4R Maintenance - Resurfacing~|~C47B86BB317D5465EFFF5B7A6EFAA2CB00566C76 88497~|~1~|~3~|~03/S<2~|~SEN-SR587 from 11.43 to 11.57 and then from 12.07 to 12.24~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EBA89DDC1FEA425E8DD93548439D5C0582D27C65 97128~|~1~|~2~|~02/SAF~|~Village of Wellington to fund difference between standard mast arms/Signal fixtures and aesthetic mast arms/signal fixtures~|~~|~5E4E0561B63ED5C2B8AF2BE456724FB8F3A99141 97128~|~1~|~1~|~01/SAF~|~Intersection Improvement.100% 4HJ7 Safety Funds capped at $163,637Remaining funds are to be paid for by the village of Wellington.~|~21 - Safety~|~D8D3787086A7681F0E08FE92B91452366B7A4F23 80684~|~1~|~1~|~01/ERD/AKRN~|~Construction of railroad grade separation at Evans Avenue and Metro and CSX tracks in the City of Akron, Summit County, Ohio.~|~22 - Rail/Highway crossing~|~E8F7AEBA275031D33DC2DC48392D81C5B9B03118 94339~|~1~|~1~|~01/STR~|~SR-235 from SLM 2.48 to 10.07, then from SLM 13.11 to SLM 19.10~|~05 - 4R Maintenance - Resurfacing~|~214A21A2C47550E9F7335B6BF591AB7808556765 109074~|~1~|~1~|~01/NHS~|~Pavement repair and resurfacing existing pavement and existing shoulder width~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F8223FFAD571CCC3161D111E803A033BA2CF159B 109074~|~1~|~2~|~02/NHS~|~Widen shoulders to 4 feet, add center line and edge line rumble strips.~|~21 - Safety~|~376A6979F6074A2371B54FD4A12E2027789D44A7 109074~|~1~|~3~|~03/S>2~|~City of Delaware Urban Paving Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F46DB48D00F0C55C3B271F1B7A02CE30F722B846 109074~|~1~|~4~|~04/NHS~|~Culvert plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~370771A04C43EF3DED07F57B5A1FCE73A7A76143 116391~|~1~|~1~|~01/NHS~|~JEF-22~|~05 - 4R Maintenance - Resurfacing~|~E3BE5E7F4EF73C4106EEA4557C616EBF7CCA8FBD 113848~|~1~|~1~|~01/NFP~|~All work in this plan split. The local match and any funds needed after the CEAO Federal/State Exchange Program cap is reached will be provided by Hancock County.~|~10 - Bridge Replacement~|~344CE10148BB0C2DDC0B6CAB934BE6B2C4B657FD 111001~|~1~|~1~|~01/NHS~|~Repair damage done by mainline vehicle collision to structure TUS-250-1577 L (SFN 7905017).~|~13 - Bridge Rehabilitation~|~20D5DCA1FADBB89234FE332009EE2ACA49A6A5B0 107702~|~1~|~1~|~01/STR~|~Resurfacing on SR 31 in Hardin County outside the Kenton urban area. From the Union County Line to the Kenton Urban Area boundary at CR 160 which is at 8.74. District preservation funds (80% 4PF7 and 20% 4PS7). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~EE714E8ECCE9F61D3A2DE9919B54C10B864A2CED 107702~|~1~|~2~|~02/S<2~|~Resurfacing on SR 31 in Hardin County inside the Kenton Urban Area but outside of the City of Kenton. On both sides of the road from the Kenton Urban Area boundary at CR 160 which is at 8.74 to where SR 31 enters the City of Kenton on the left side at 9.96 then on the right side of road until the end of the project at the intersection of SR 292 at 10.16. District preservation funds (80% 4PF7 and 20% 4PS7). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~1836F76DB3472EC990E6B495CA210152A16686F6 107702~|~1~|~3~|~03/S<2/KENT~|~Resurfacing on SR 31 in Hardin County inside the City of Kenton. On the left side of the road from where SR 31 enters the City of Kenton on the left side at 9.96 until the end of the project at the intersection of SR 292 at 10.16. District preservation funds (80% 4PF7 and 20% local funds from the City of Kenton 4BG7).~|~05 - 4R Maintenance - Resurfacing~|~EC90616E43E5D17BA18D50B7A61D3A8B5E5E5C03 111080~|~1~|~1~|~01/STR~|~Split for culvert replacement~|~04 - Reconstruction - No Added Capacity~|~B1D4644B2CAE55D8E456848F76C3ACECB76CFFB1 109070~|~1~|~1~|~01/STR~|~DEL 36 from 0.00 to 6.94 - Existing Width~|~04 - Reconstruction - No Added Capacity~|~72EA12783E87D78E9ED4E05D8FBDD04B1C2BA952 109070~|~1~|~3~|~03/STR~|~Culvert work - existing length~|~04 - Reconstruction - No Added Capacity~|~A2F32748DDB9C0D00B3C3114609A3B357D4CCAF6 109070~|~1~|~4~|~04/STR~|~DEL-36-0.00 - 6.94 - Widening~|~03 - Reconstruction - Added Capacity~|~6CC40F2BC7E79E8F2EC3473A29812F39C314DAA6 109070~|~1~|~5~|~05/STR~|~Culvert work - extension~|~03 - Reconstruction - Added Capacity~|~1500CD0DD83CFCD6B62BF1F734C12436AC5CB1D5 109070~|~1~|~2~|~02/S>2~|~DEL-36 from 6.94 to 7.28 - Existing Width~|~04 - Reconstruction - No Added Capacity~|~06E2560D20F1FC458A2236D503AD255AB6927BEB 109070~|~1~|~6~|~06/STR~|~All work associated with DEL-36-1.85 (SFN: 2100789)~|~13 - Bridge Rehabilitation~|~1BE4E790E5F5F48BD43CB3764CE5B8620FAB7AC3 93724~|~1~|~1~|~01/NFA~|~Bus Purchase.~|~44 - Other~|~FEC0F1CEE4A98703D187FABF1F522E220F38FF55 94183~|~1~|~1~|~01/NFP~|~Construction of the Warrensville Full Service Facility~|~44 - Other~|~2D149A716AE5BB28842AF77EF35C9E833E12AD0B 126487~|~1~|~1~|~01/STR/PER~|~CEAO CSTP funding for resurfacing CR 6 (Tunnel Hill Rd).~|~05 - 4R Maintenance - Resurfacing~|~E2B18B6A4575A47D8B4131E125483112725CCE89 118503~|~1~|~1~|~01/STR~|~WAS 550-12.17 Culvert Replacement CFN:1986969~|~04 - Reconstruction - No Added Capacity~|~52BEE3524A4DB822ECFB29E5AE3F61444325BE45 121268~|~1~|~1~|~01/STR~|~All Work is within this split~|~10 - Bridge Replacement~|~E0C39FD5A73D3CD079D2F3860D787FEB31923AE3 97095~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 144 6.31, SFN 0503185. Replace existing bridge and realign SR 144 both vertically and horizontally. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~835756A1082228C8612A073DDC354DBF7AF5564D 102804~|~1~|~1~|~01/IMS~|~Slide repair work eligible~|~~|~F23E8B40158C2BABD03922EC1927E62D2A41ED5F 112462~|~1~|~2~|~02/NFA~|~Plan split for non-federal aide work in East Cleveland.~|~05 - 4R Maintenance - Resurfacing~|~74FE7589141FB5F23A79F425453E6EBF0CC60A32 112462~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work for Cleveland Heights portion only.~|~05 - 4R Maintenance - Resurfacing~|~BFEC705CD200522AD7A4D5F1DF53322FD8D6E528 112131~|~1~|~1~|~01/IMS~|~Block PID for FY 2026 Drainage Structures throughout District 4.~|~~|~A068A8F521E13A0CDA250987314D5ED1509A101A 107177~|~1~|~1~|~01/STR~|~All work in this plan split. Federal and state fund from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~CA9BB0C9E22517DE6800DCDE9C8FEF463424F43A 101582~|~1~|~1~|~01/STR/JEFC~|~DSR# JEF-017~|~04 - Reconstruction - No Added Capacity~|~4236F1CB6F7FE24335DD3EF042D87BB64880B94F 117963~|~1~|~1~|~01/S50~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~E8A1781CEF361BA290E805AAD8C3D7896EC18D11 118903~|~1~|~1~|~01/STR~|~Resurfacing SR 258~|~05 - 4R Maintenance - Resurfacing~|~27E4B2D504818C0E6EA23D1E3F135F9DF1615F81 110945~|~1~|~1~|~01/S>2~|~Paving work on the Urban STP system.~|~~|~3365040A95E2525C03B31E2EC59CC578A7B50931 122832~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~E09F1543C868123AA4B2480B08E7F528C2303F35 105125~|~1~|~1~|~01/STR~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~44CE98927F7B5A81C917FC4E9BEA2A9912E58C95 114948~|~1~|~1~|~01/S5K/ALLI~|~Resurfacing, urban paving in the city of Alliance.~|~05 - 4R Maintenance - Resurfacing~|~50CE339D4A950B56A67ECFB574F9E5259D36E5CE 114948~|~1~|~2~|~02/S5K/ALLI~|~ADA curb ramps and full and partial depth repairs.~|~04 - Reconstruction - No Added Capacity~|~84AF70D159AEB4A7282E03EC970EBB1F90CA84A0 87037~|~1~|~2~|~02/NFP~|~100% Local cost work items.~|~21 - Safety~|~302A90C22233530FEB49D2D4BDCF96EDE8797D2B 87037~|~1~|~1~|~01/SAF~|~90/10 funding split for federal HSIP funds~|~21 - Safety~|~BF027B3B2F84EE69C6637A9261E8EFA59100093C 116309~|~1~|~2~|~02/S5K~|~For work on Mus-666 Culvert~|~13 - Bridge Rehabilitation~|~C644B07DAC0979BB8F85B35A1BD0EC87BE33FE41 116309~|~1~|~1~|~01/NHS~|~For work on Lic-16 Culvert.~|~13 - Bridge Rehabilitation~|~BB97B016AE2F80C51F38B57AC6757CF204DE133C 101596~|~1~|~1~|~01/STR~|~DSR# JEF-010~|~04 - Reconstruction - No Added Capacity~|~F29809F77C8A4E9E36DA052AC3581D7446ABAC8C 96210~|~1~|~1~|~01/SAF~|~Safety funds~|~21 - Safety~|~9DD4CE76B8B086BBA81AD8C91E15C06432553D65 115092~|~1~|~1~|~01/IMS~|~Concrete pavement repairs and diamond grinding and grooving.~|~05 - 4R Maintenance - Resurfacing~|~7B43ACA9DFC826A2D7643EB0801EB0C95D94011D 97590~|~1~|~1~|~01/STR~|~ADA SR41 Slide Repair~|~44 - Other~|~F8AFCE0398C661588C9EB618B18C449DA3138E51 98829~|~1~|~1~|~01/NFA~|~Mill/Fill District HQ Parking Lot and egress, stripe parking lot, reconstruct concrete sidewalks, construct positive drainage, and construct new signage at the D10 Headquarters Office.~|~05 - 4R Maintenance - Resurfacing~|~174CC55764D4298DE5EBBE906F30E8D606DA7818 111588~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes. 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder.~|~21 - Safety~|~A068731FB6A9C98E52AE862C4761B5C7E3FED94A 100001~|~1~|~1~|~01/NFP~|~Split for tree and brush removal~|~44 - Other~|~6BB2DD4F9BE69FD9615C762AD01F7EF5E338320A 119678~|~1~|~1~|~01/NFP~|~Field Pave~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AFB4C8F92834EA08704B7A266CA8FAE58E2383D4 123521~|~1~|~1~|~01/STR~|~GSM slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7E18F1F90CD2244EA382681C27E91A1F1BD44512 87131~|~1~|~1~|~01/NFA~|~100 % State Geotech funded slide repair~|~44 - Other~|~FCD78C58B141E9B58E73657DA6194746643948EB 119117~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~07B32D914AA5C2F69CA19BC9A5B43D6E9BCD0BBA 119117~|~1~|~2~|~02/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~BFC9258B2967B7D6819C523DA74BD420B8EB181D 119117~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~049C09F87203A96076EFFFC4A121E355365A8F75 119117~|~1~|~4~|~04/S5K~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~98D55F80F668E92DB1D9A22A62095934B1DF03BB 119117~|~1~|~5~|~05/STR~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~0DE18DBEDE801C9DAC28B9C86F7DCB0842511267 94073~|~1~|~2~|~02/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~9C303ABE2E076E904238A4ACED232EE50677F43C 94073~|~1~|~1~|~01/NHS~|~Resurfacing of US-20 from SLM 12.87 to SLM 14.78, in Ashtabula Township, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~3A066401C4CFF5CFE0527FCC08D4648AFC4AA9DB 94073~|~2~|~3~|~03/NHS/ASHT~|~Total pavement replacement from Ashtabula West Corp (SLM 11.88) to Seymour Road (SLM 12.87), in the City of Ashtabula, Ashtabula County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~1407A3669C6CBD1476156935867D0EEF1956F665 94073~|~2~|~4~|~04/NHS/ASHT~|~ADA curb ramps and sidewalks in Urban section.~|~04 - Reconstruction - No Added Capacity~|~73E5C6AA8F5D4C1C14CCEDABAE4558925F925C35 97934~|~1~|~1~|~01/CMQ~|~Construction of 550 foot Westbound right turn lane on Tibbetts Wick (CR28) approaching US-422 and SR-169 in Weathersfield Township, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~0E06BD64AAAD1D64A89D21B3120CBDF1D9852C8F 113482~|~1~|~1~|~01/ENH~|~City of Portsmouth SRTS project~|~21 - Safety~|~6EF073220A38DEEAEA04564D92C077C4487B4AF1 109361~|~1~|~1~|~01/STR~|~Culvert replacementJAC-139-2.70 (CFN 1814767)~|~04 - Reconstruction - No Added Capacity~|~D0EE1129A30B6A17DB179B867F76E59F9F74F64B 105714~|~1~|~1~|~01/IMS~|~Work at the interchange of Interstate 75 and SR 65 in Allen County and the interchange of Interstate 75 and CR 99 in Hancock County.~|~44 - Other~|~2AD599EA027F7357A39EFF851F7113312A9E3E1D 105714~|~1~|~2~|~02/NHS~|~Work along US 30 in Allen County.~|~44 - Other~|~CE72298A509D270EB8F9663F187F0AD228F59162 105714~|~1~|~3~|~03/STR~|~Work along SR 696~|~44 - Other~|~B1EC70098498B04E1BEED5D3A0CB0FADFD96F025 112669~|~1~|~1~|~01/STR~|~District wide culvert replacement project FY26.~|~~|~F1717F0C4C94B9C642C7CABE55565D0AE53F2472 101534~|~1~|~1~|~01/STR~|~DSR# HAS-005~|~04 - Reconstruction - No Added Capacity~|~498CC30C16B180056545AA8A171ECDD9040AFACF 93864~|~1~|~1~|~01/NFP~|~ODNR Resurfacing/Culvert project~|~05 - 4R Maintenance - Resurfacing~|~C6B51F440872159864A2C6FB34CB9B0A5CDF98FB 89130~|~1~|~1~|~01/NHS~|~Phase 2B major rehabilitation of existing pavement; construction of an additional lane in each direction (6 lane section) MOT-US-35 18.590 to 21.200 GRE-US-35 0.000 to 0.550~|~04 - Reconstruction - No Added Capacity~|~0C19A6E10F1A437092BFAE1A6B0B6431B4478012 89130~|~1~|~2~|~02/NHS~|~This plan split will cover the for the add a lane items~|~03 - Reconstruction - Added Capacity~|~5043938AA218F29B5361D5CB72A2C207D23E1FB2 89130~|~1~|~3~|~03/NHS~|~Bridge Work~|~04 - Reconstruction - No Added Capacity~|~B08FACF5B8D79F15D67916BAA41D200E8A5015AF 89130~|~1~|~4~|~04/NHS~|~Repairs District 8 agreed to pay~|~04 - Reconstruction - No Added Capacity~|~0656E8F3BECB2457411D4135FF309CB8F2BAA82F 124619~|~1~|~1~|~01/NHS~|~added NHS plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~64D1975C07F896EE12BCE0B9D7A76472895075DE 102628~|~1~|~1~|~01/NFP~|~Pavement Marking~|~21 - Safety~|~938272E6F7123E9A73B7A1DEBF9633C7043F34F7 102628~|~1~|~2~|~02/NFP~|~safety application for the installation of centerline rumble stripes along ASD/WAY-250 ~|~21 - Safety~|~47594D1D7DCE03C71BCB6167F17A13CE16569648 106667~|~1~|~1~|~01/ENH~|~Construct sidewalks on Lakeview Road from Wabash Ave. to Park Lane Drive including crosswalk at Wabash.~|~21 - Safety~|~94C80520A1C83AD33AE313B2A9303571B563838C 125819~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~4A2D4AF138E34E55B9BFA7D4FDD0C58889F82F5C 83853~|~1~|~1~|~01/STR~|~"01/STR/CV/ " - District Preservation Culvert Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert repair on: 1) ID 15412 Fai-SR 37-26.00 48" x 46' Slab Top Culvert; 2) ID 15413 Fai-SR 37-27.70 90" x 120' 3 sided Concrete Box Culvert;~|~~|~2F238AF525918C2845091EBE09597DA57A11A067 114934~|~1~|~1~|~01/STR~|~Covers portions of US 224 outside of the Ottawa urban area.~|~~|~0A5E029AB1A0745588C23588A40B0D8B8D18CD6D 114934~|~1~|~2~|~02/S5K~|~Ottawa Glandorf urban area split. US 224 from SLM 18.34 to 19.89. ~|~~|~18C879F94D5EDEE7A7A6578E730EF50275F434C3 115809~|~1~|~1~|~01/SAF/KCEO~|~Knox County CEAO Highway Safety Improvement Program Funding - 4HB7 (80% Federal) / LNTP (20% Local) - See CAP Comments - Widening from 10 foot lanes to 12 foot; Resurfacing and various safety enhancements.~|~04 - Reconstruction - No Added Capacity~|~AF88481A3CA2CC8411F07CC78DAF5094DFBFE40B 95534~|~1~|~5~|~05/S<2~|~Split for Curb Ramps100% Local~|~05 - 4R Maintenance - Resurfacing~|~4BECE042CDAA4BF911377EE974086DD978459421 95534~|~1~|~4~|~04/S<2~|~Resurface SR159 from SLM 3.73 to 4.32~|~05 - 4R Maintenance - Resurfacing~|~9A716FB48D5CF0410D9F24C8CB9C924C5E5BD967 95534~|~1~|~2~|~02/NHS~|~Resurface SR159 from SLM 2.63 to 3.73.~|~05 - 4R Maintenance - Resurfacing~|~BD8E7A208F9697AD50F9C2E9DF0489015973F96C 95534~|~1~|~1~|~01/S<2~|~SR 159 (1.22 to 2.63)This is for the City of Chillicothe portion.~|~05 - 4R Maintenance - Resurfacing~|~C60CE38437D44F145A9CD3FD2D2F0013609101D5 95534~|~1~|~3~|~03/NHS~|~Minor Rehab of:SFN 7104413 SLM 3.73SFN 7104294 SLM 3.13SFN 7104324 SLM 3.13~|~13 - Bridge Rehabilitation~|~F44FD0B5F8473501F60437C12CE1B920C0BF2FCB 114880~|~1~|~1~|~01/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~08D54F6ACC5784328C49BCF18516B90EE72D4221 114880~|~1~|~2~|~02/S50~|~Urban Paving Plan split for locations completely inside the City of Delaware.~|~05 - 4R Maintenance - Resurfacing~|~AA00C9C575467DB526D85236A24A16B168DFA01F 93877~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using a Microsurfacing asphalt treatment. WAS 60 3.60-5.20. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A0AD018888EB9C114BC2A9A66C3605A8C6823DAB 93877~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a Microsurfacing asphalt treatment. WAS 60 5.20-19.73 and 21.03-24.09. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2E1665CD31B9BC7D23439FCD901B311BB35EE978 108287~|~1~|~1~|~01/NHS~|~Emergency repair project.JAC 32 17.16 JAC-001~|~04 - Reconstruction - No Added Capacity~|~3622F5839EB537A5DE05AA964F59F99FDCDFFD26 117208~|~1~|~1~|~01/MPO/CIN~|~Reconstruction of Victory Parkway/Eden Park Drive from Martin Drive to William Howard Taft. Rehabilitation of the bridge over Kemper Lane. Restriping to provide bike lanes.~|~21 - Safety~|~E0D1695EA78AE7E9FE40174D45E672EDCF7C5909 102201~|~1~|~1~|~01/S<2~|~LAW CR 1 5.35 ER slide repair.~|~44 - Other~|~BEFE1A700C2A3EA948E2443C3292DC967B87F091 106819~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. ATH 33 15.37 L (SFN 0505838) and R (SFN 0505846). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~D5B66A2891C7B255FD94F56E1359E1F7235B99ED 106819~|~1~|~2~|~02/S<2~|~Concrete bridge deck overlay. ATH 278 2.94 (SFN 0503347). Urban other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~5C670E4F1E8C49E25789679E64E0A730ED380EC8 84232~|~1~|~1~|~01/S>2~|~Improve sight distance of intersection of Factory Road and Richmar Drive; widen to three lanes from Nutter Park entrance to Dayton-Xenia Road.~|~21 - Safety~|~9FAE63AEE8F3DFAE560795962F8FB1FD634D5F80 102965~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: DAR SR 47 SLM 13.88 to 18.11, DAR SR 47 SLM 18.80 to 23.81, DAR SR 185 SLM 6.20 to 7.42 & DAR US 36 SLM 8.35 to 9.61.~|~05 - 4R Maintenance - Resurfacing~|~3802055F4C2071D0F5923E18605B2152407D9DBB 102965~|~1~|~2~|~02/S<2~|~Smooth seal on small urban route: DAR SR 121 SLM 17.97 to 18.75.~|~05 - 4R Maintenance - Resurfacing~|~4353AB3E696677851C37686D0ABF0E18F719672F 107811~|~1~|~1~|~01/NFA~|~ER Event OH18-01. Landslide repair project. MOE 255 16.70-16.74. MOE_NF_0003. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DC7ED945D38010FA10CB25F1E3D77C75AFEA8B8F 112110~|~1~|~1~|~01/IMS~|~Emergency (Type A) to repair the wearing surface on top deck (southbound lanes) of the Brent Spence Approach bridge HAM-71-0000L near where the bridge close to where the bridge crosses over Mehring Way.~|~13 - Bridge Rehabilitation~|~E9980FFF4D1CE30E300A43B75911CB23DAB43276 108003~|~1~|~1~|~01/SAE~|~Application of pavement markings on various county roads in Preble County.~|~21 - Safety~|~CFDE576BCD0B789599B183FCD23CA54750EDF173 108489~|~1~|~1~|~01/NFP~|~All work in this project.~|~44 - Other~|~F19449CB4D9700AA884A1549678F72B07D3C1038 110407~|~1~|~1~|~01/SAE~|~Safety Program Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - intersection upgrade of US 22/SR 159/CR 30.~|~21 - Safety~|~DA004FD1F6C9180433EABDFDAA03DCC1E25953F2 86475~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Bridge replacement over Yellow Creek.~|~10 - Bridge Replacement~|~0F336ECC3AF4C4A464A3089D497364877E5FC983 96556~|~1~|~4~|~04/S>2/YOUN~|~Resurfacing of MAH SR 193 from 1.36 to 1.46, MAH SR 289D from 0.42 to 0.60, MAH SR 289 from 0.00 to 0.40 and 1.41 to 1.75, CR 549 0.00 to 0.30 (will become SR 289 after LRS update), urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~CDF6D286C8ACC062F55564E8A34CD88BDDA93554 96556~|~1~|~2~|~02/S>2~|~Resurfacing of MAH US 62 from 19.44 to 19.57 and MAH SR 289 from 7.28 to 9.93.~|~05 - 4R Maintenance - Resurfacing~|~E3C40638DFB6082E230169C91FA00688367266E8 96556~|~1~|~1~|~01/NHS~|~Resurfacing of MAH US 62 from 19.36 to 19.44. Priority System.~|~05 - 4R Maintenance - Resurfacing~|~538F39CD4FAE9879809C74CAB7BFC00F7135BD84 96556~|~1~|~3~|~03/NHS/YOUN~|~Resurfacing of MAH US 422 from 3.90 to 5.06, urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~CDE7CD7BEF75AB7F4B66EF1BB96A67FCD607C446 96556~|~1~|~5~|~05/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~B4D9E8155F23B997C69B359042319AB5B60C8EF8 96556~|~1~|~6~|~06/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~AA9A7F301EEE72A149A753C376BDA35003B09845 96556~|~1~|~7~|~07/NHS/YOUN~|~100% City of Youngstown items such as full and partial depth repairs and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~F59CFDC1B13CC940D79422B53EEB55CF25897ABD 96556~|~1~|~8~|~08/S>2/YOUN~|~100% City of Youngstown items such as full and partial depth repairs and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~D8AD7B0B722900F524F22EA1D736F735C8909575 97309~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~C1BBCA344634FA88BE738C03617396623DF87B81 105631~|~1~|~1~|~01/STR~|~plan split~|~44 - Other~|~35C69C738F0D981550FBDB2152D11EB803308C30 109704~|~1~|~1~|~01/MPO~|~Widening of Crescentville Road from Transportation Way to Centerdale Road to provide a two way left turn lane, addition of a new traffic signal at the Chesterdale intersection, and drainage improvements.~|~21 - Safety~|~A1959CB66E01723C0D2F915506B2C04C6CCEECD6 109704~|~1~|~3~|~03/NFP/GCWW~|~Plan split for 100% locally funded work by GCWW.~|~43 - Utilities~|~EC2E18CC4FDDDD0BCE73CEF02E3F697A5B11CABF 109704~|~1~|~2~|~02/NFP/SPR~|~Plan split for the Tivoli traffic signal work, funded at 100% local, since the signal does not meet warrants.~|~21 - Safety~|~DA5FBA64FC6B1D564DF1679942E0C1DE8968CAE1 98893~|~1~|~1~|~01/NFP~|~A TID funded project for the resurfacing of ATH CR 1 3.74, a portion of CR 3 New Lima Road, CR 5 Bradbury Road, a portion of CR 28 Bashan Road and profile correction and resurfacing of CR 33A Darwin Road. Funded 100% State TID funds.~|~05 - 4R Maintenance - Resurfacing~|~00A51719FE87A5ED759739C5A77F2C9AC659EC0A 107796~|~1~|~2~|~02/S<2~|~Urban Paving Plan Split: FRA-104: 1.49-1.66 1.68-1.73 3.40-3.68 3.71-4.08~|~05 - 4R Maintenance - Resurfacing~|~398B7407BE467D888BD21B5327302AAE029C198B 107796~|~1~|~1~|~01/S>2~|~General System Split: FRA-104: 0.00-1.49 1.66-1.68 1.73-3.40 3.68-3.71 4.08-4.23 5.03-6.53~|~05 - 4R Maintenance - Resurfacing~|~36DCA50479B55231E94F384D0624F65A85061A3E 107796~|~1~|~3~|~03/S<2~|~General System Bridge Split: SFN's 250443~|~17 - Construction Engineering~|~433FBF9A201F807E05C7AB7750FFEB8F6958AE71 120431~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State~|~21 - Safety~|~A5A3E86718B6161F6DAE4BC5FD3569BEF0A58A2D 90542~|~1~|~1~|~01/MPO~|~Oxford State Road: from Yankee Road to Spurlino Way Project involves total roadway reconstruction, realignment of the roadway to straighten a sharp curve, addition of curb and gutter and a stormwater system, addition of signage and pavement markings, and reconstruction of the traffic signal at the AK Steel slag gate, where heat from slag haulers has melted existing signal wires. Wiring equipment will be replaced including the controller, signal heads, preemption system, and radio communication.~|~04 - Reconstruction - No Added Capacity~|~EE3B05D795732C8986497F5D88F78CC2310BDF44 118589~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 - ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~29BE57AC2903633EADEDFCF22EEEF5823F44D257 94443~|~1~|~1~|~01/STR~|~Bridge Repairs- MED SR 0083-03.53~|~13 - Bridge Rehabilitation~|~188692D758D9A9A2D39DAFEDA8C423101DB50677 94443~|~1~|~3~|~03/NHS~|~NHS Bridges-Bridge Repair- MED US 0224-15.82~|~13 - Bridge Rehabilitation~|~E19DF5519AF5846353407F4514047B11F5BF58E8 94443~|~1~|~4~|~04/NHS~|~Installation of Concrete invert at ASD US 0030 02.96~|~04 - Reconstruction - No Added Capacity~|~5EE399733C01C3032F43124595525E527F1413E2 94443~|~1~|~2~|~02/IMS~|~Interstate Routes- Bridge Repair-MED 71-15.29~|~13 - Bridge Rehabilitation~|~6B68240144EC78E9AB2B7B9F616D484B13C142A3 94493~|~1~|~1~|~01/STR~|~Re-deck and painting of SFN# 7709994, SUM-SR303-10.29, over the Hike & Bike trail, in the Village of Boston Heights, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~14A742845F793479FB7AC59049BCC6A9145EDD98 93273~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - Major Bridge 4BU7(Federal 80%) / 4BT7(State 20%) - CAP of $8,000,000.00 for Construction Phase - Bridge replacement of SFN #2300427 FAI US22 23.89 Intersect: Conrail Rr & Lit Rush Cr: Not BR Eligible Length=515' SD/FO(0) SR=63.5 DSR=5~|~10 - Bridge Replacement~|~F372DF5C712C4ED228AD8AD24D5C1EFF0A4801C5 87301~|~1~|~2~|~02/BRO~|~Bridge rehab on US-62 at SLM 0.51, BR eligible2502917 FRA US62 0.51 Intersect: Big Darby Creek~|~13 - Bridge Rehabilitation~|~0B048D01162B604080437E9BD2227DA034FC6FD4 87301~|~1~|~1~|~01/S<2~|~Bridge rehab on US-62 at SLM 0.34, not BR eligible 2502887 FRA US62 0.34 Intersect: Big Darby Overflow~|~13 - Bridge Rehabilitation~|~82A2A800447E966E8A89CE88E512125EA3E656FA 125129~|~1~|~1~|~01/NHS~|~Noise wall installation.~|~~|~5D454BB2DF5C4F43D2D3678067343762B03EE4A9 125129~|~1~|~2~|~02/NHS~|~Construction Engineering ~|~~|~1F11C9773631742A5D310BA57AAC54019C3934E7 121789~|~1~|~1~|~01/S>2~|~Resurfacing CR 1 & 107~|~05 - 4R Maintenance - Resurfacing~|~7875BEE66EA35E5B5550E4E70AF17EA10B7A1B6E 95851~|~1~|~1~|~01/MPO~|~Resurfacing of Warhurst Road (CR573) from SLM 0.00 to 0.34 and Tenney Avenue (CR-574) from SLM 0.00 to 0.95, in the City of Campbell, Mahoning County, Ohio.~|~~|~5FC98718ADC942AF79B7B8E70380491C48269865 102120~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3E08EABFEB683BD9BCE999AEE524015C501B6251 102120~|~1~|~2~|~02/STR~|~Culvert to be replaced with slide repair project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~19C88B391F1AA00B8DFD46EFEF7A2A3A161FEB39 116710~|~1~|~1~|~01/STR~|~plans split for resurfacing on the rural sections~|~05 - 4R Maintenance - Resurfacing~|~2DBCC2BDC020D0EB3E6883AB6C150083D6573B48 114709~|~1~|~1~|~01/IMS~|~Construction of noise wall.~|~~|~168E17566A8708053700680B1CA551347C5179E9 123381~|~1~|~1~|~01/NFP~|~Spot paving~|~05 - 4R Maintenance - Resurfacing~|~EC02D3DC2D909EC7F5F553EDF18DF36DA27343BA 110649~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span.~|~~|~2A22077898E80F2694571A9611F9FA671983E486 110649~|~1~|~4~|~04/STR~|~Minor bridge rehab 10' to 20' span.~|~~|~3F7B1B240A577DA92642F2F672BA09F5248BC7A4 110649~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~4AB88603D01BBE1A874125F9621A0FB68D6D036E 110649~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~D6D5041F83B5B93EA62C4B6CB071AC4683D2424F 103706~|~1~|~1~|~01/SAE~|~LAW 52 15.03-21.52 signal work.~|~21 - Safety~|~5C3B601F56BB2DDCA0BDF441FB0D3DA404E75E63 114495~|~1~|~1~|~01/NFP~|~Major 2 project to rebuild pavement.~|~05 - 4R Maintenance - Resurfacing~|~50A7B749EC55530ED656C96D137664921E183847 83548~|~1~|~2~|~02/SAF~|~Erie County - utility work-mansholes/valves/adjusted~|~21 - Safety~|~24A014324FD7356E473C7C657FA8ADE0D9DC6FC5 83548~|~1~|~1~|~01/SAF~|~Intersection Improvement - 90/10 Safety Funds~|~21 - Safety~|~4C23CBEA94BF9FBD93B3F3DE6A177ABBD4B96088 83548~|~1~|~3~|~03/SAF~|~100% State Funds - District Allocation - Signal cabinet and controller~|~21 - Safety~|~8DB3E1D3B03699813C36B2E64BA7C07C3B410AE4 124384~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work on MLK Dr. using MPO STBG funding~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6762A2DDED67898D40C677D9AF1EEA5DA7084595 86461~|~1~|~1~|~01/S>2~|~Consolidate and manage access points along existing Red Bank Road and Red Bank Expressway to establish a controlled access arterial roadway, including coordination for accommodation of multi-modal components and tie in with a new interchange at US 50.~|~~|~801E3B97D490E9199B1441110A94C9AA5DFD7DA4 86461~|~1~|~2~|~02/ERD~|~This plan split includes all work necessary to construct the shared use path~|~28 - Facilities for Pedestrians & Bicycles~|~57B0F1BFE8CC4D627CDF950FDFCF2A9210995EBC 84613~|~1~|~1~|~01/NHS~|~Replace continuous slab superstructure of bridge CLE-32-0769N. SFN: 1300407 and Intersect: Backbone Creek~|~13 - Bridge Rehabilitation~|~09B68A1E1FB054A69A658D32F7E4B60D40A756F1 91300~|~1~|~1~|~01/STR~|~Slide Repair~|~44 - Other~|~36420CAE3A44E7B0D7B58B452ACB5AAB3B8DA5CE 105096~|~1~|~1~|~01/NFP~|~D09 Bridge Overlay FY21~|~47 - Bridge Preventive Maintenance~|~C35CF771AFF9F0B6032542D27680202853B77041 118691~|~1~|~1~|~01/ENH/STPK~|~Bridge replacement.~|~28 - Facilities for Pedestrians & Bicycles~|~340D8B43AD1788E8DBBC7003681AEBD42335E5E5 122134~|~1~|~1~|~01/BRF~|~Replacement of SFN 4931351 (Robison Road over Deer Creek) on a modified alignment. Federal/State Exchange.~|~10 - Bridge Replacement~|~D2CA6AAACC6E71E03FEDD82F3E44C5E60F2116DA 107265~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 56 4.97. GSM funded. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F7E2D27AB68B000E61A8073EC60D4376317643FA 97302~|~1~|~1~|~01/NFP~|~100% state funding for constructing noise wall at I-70/James interchange - SW quadrant~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C52D98B43515BB02C63224BDC38099DBD8DEDC9 100560~|~1~|~1~|~01/STR~|~Resurfacing of SR-122 from SLM 0.00 to SLM 3.86 in Butler County and SR-122 from 19.04 to 24.45 in Preble County.~|~05 - 4R Maintenance - Resurfacing~|~88EAA77B828444FF76C2D5D44F27C2199E64893A 108974~|~1~|~1~|~01/NFA~|~Development goal mentoring on general IDIQ agreements in District Nine~|~~|~1037DFDCCAED2363DA9927D4C9D639EAA560E37C 123724~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work on the general system~|~05 - 4R Maintenance - Resurfacing~|~2EC9194858916C66090F1E12962E2603A7BCA396 93009~|~2~|~2~|~02/NHS~|~- District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Deck Sealing and Deep Joint Sealer of bridges along Fai-US 33-8.07 to 17.39~|~47 - Bridge Preventive Maintenance~|~99F77109C215735B731E6D8E2FBA93CE7C6B2682 93009~|~1~|~1~|~01/NHS~|~- District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Fai-US 33-8.07 to 17.39~|~05 - 4R Maintenance - Resurfacing~|~DE94532A4DF1D9A1962F16A7BE6D49A42684F23C 103808~|~1~|~1~|~01/NFA~|~The City will construct an extension of two lane Malsbary Road from its current terminus east 650 linear feet to Kenwood Road and including a new public rail crossing surface and signalized intersection.~|~01 - New Construction~|~F5C1A77B6305F984BD266F2F6145A111810170FA 107415~|~1~|~1~|~01/NFP~|~Plan split~|~05 - 4R Maintenance - Resurfacing~|~87768B6A5C8474EAC417090DC12A442C24093C07 109168~|~1~|~1~|~01/SAF/FCEO~|~Fairfield County Engineer CEAO HSIP Funding ? 4HB7 (80% Federal) / LNTP (20% Local Match) ? See CAP Comments - Safety improvement of intersection of Memorial Drive and Election House Road.~|~21 - Safety~|~0EC075328F9F65AE06A1EACE325AFCDE4E52FB2A 115700~|~1~|~1~|~01/STR~|~Split for rural STP paving~|~05 - 4R Maintenance - Resurfacing~|~C4649B67669C346B24C288502E289BA3816726A8 121529~|~1~|~1~|~01/SAF~|~Raised pavement markers~|~21 - Safety~|~54DE7A511D42892203B42191A9F6C4D976533487 96391~|~1~|~1~|~01/SAF~|~Construct sidewalk and crossing improvements including ADA curb ramps on the west side of Laurel Drive from Poppy Drive to Carnation Drive and the north side of Carantaion Drive from Laurel Drive to Hamilton Road.~|~21 - Safety~|~A168050D1E25787E138B815AF56C3AFB980AF13E 125968~|~1~|~1~|~01/STR~|~Replace bridge on SR41 in Fayette County.~|~10 - Bridge Replacement~|~4EFD6C5261B7202C6A0F71F11F61EDBC32F6A78F 95722~|~1~|~2~|~02/S<2~|~Urban Area Paving including paving in Perrysburg. Woo 25 18.29 - 20.20~|~05 - 4R Maintenance - Resurfacing~|~55FF3F178F993577CCF38C9E7FA9882409F52810 95722~|~1~|~1~|~01/STR~|~Rural area paving on WOO-25 from SLM 15.82 to 18.29~|~05 - 4R Maintenance - Resurfacing~|~30E7EDEA0807098B7B131F272ED7DD8582DCC92A 95722~|~1~|~3~|~03/S<2~|~CFN 1853826 WOO-25-19.29~|~04 - Reconstruction - No Added Capacity~|~E762481B42D703142F85FF2FC6BA385D0654DF25 95722~|~1~|~4~|~04/SAF~|~Plan split for Offset Left turn lane at SR 25 and 582~|~21 - Safety~|~52D53D823E980D04F27CF8BB7D2273306A1581DE 96294~|~1~|~1~|~01/STR~|~HIG 134 0.00-5.18BRO 134 0.00-0.34~|~05 - 4R Maintenance - Resurfacing~|~2972885B0C0B2C350EA8E08F6B7A65071BE8918C 96294~|~1~|~2~|~02/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~253D4FD8E5FC0071479B2E8D3859DCD95D4DB176 96294~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~0123BFCC22EDD5FDDD94982DAD564F53C4CEE431 100513~|~1~|~1~|~01/STR~|~Asphalt resurfacing of CAR-39 and CAR-542 in Dellroy with 441 asphalt concrete and CAR-332 with a 1" Fine Graded Polymer Asphalt.~|~05 - 4R Maintenance - Resurfacing~|~81733B676A8F3757A57C15349F3327B437FFDACC 111167~|~1~|~1~|~01/NFP~|~ODNR project to resurface Lodge Road in Hocking HIlls State Park. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~277C222ECB299BD79BF711B7244E2C6B05829674 101354~|~1~|~1~|~01/NHS~|~Seal concrete bridge decks throughout District 11~|~47 - Bridge Preventive Maintenance~|~BB81F6B6CC2ABE7F9AB7D234CF3B5B611FE06577 94674~|~1~|~1~|~01/BRO~|~Bridge Rehab. SFN 11003369 CHP 560 0541 over Anderson Creek.~|~10 - Bridge Replacement~|~9B5162E46D3F4D5BE529313C209BAEEB9071F4F3 108168~|~1~|~1~|~01/STR~|~Emergency repair of landslide. Not permanent restoration. 100% Federal ER funds on DSR MOE-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0683BE6B62F3796F85E96A138B280442885445CD 125641~|~1~|~1~|~01/SAE/DEL~|~Construction of a single lane roundabout at the intersection of S Section Line Rd and Clark-Shaw Rd.~|~21 - Safety~|~C78B90F3A53FACD72164EE42E0F0176D7BCC53B8 102396~|~1~|~2~|~02/IMS~|~Resurfacing of SUM I-271 Rest Areas only.~|~~|~718C0DC1D2B8FE8D55B07C1BF9E6E7DC68C82418 102396~|~1~|~1~|~01/S>2~|~Resurfacing of SUM SR 162 from 0.00 to 2.21 and 2.42 to 5.62.~|~05 - 4R Maintenance - Resurfacing~|~BDA1B23DDB0CD49595800A0165F5707754F315AC 112778~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~51A5D46E0B5ADB12C360F03278C91DE409165F9B 112778~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~54AE8807B6FE6DE74E5F40A0AAA1E9375F51A09A 119593~|~1~|~1~|~01/MPO~|~TLCI Items~|~28 - Facilities for Pedestrians & Bicycles~|~46DF32B6B23959C953A64061D1577A812E0A4D46 113817~|~1~|~1~|~01/NFA~|~LAW 775 18.50-23.94Major 2 funding.~|~05 - 4R Maintenance - Resurfacing~|~680BD5507CB0E6BDB7D2D7FD91683AEE2FD273FB 89418~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 266 7.70. Several landslide areas below the roadway for over 1500 LF of SR 266. Proposed mitigation is to relocate roadway into existing hillside. 80% Federal ER funding and 20% State Emergency funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B7E450129AD9C94BB298724782A1399F038BB9EE 96534~|~1~|~1~|~01/STR~|~Maintenance contract for FY 2018 herbicidal spraying. Funded 100% state.~|~44 - Other~|~89F2387B86C66F4088A8C3E7F70E68350F911238 110668~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 20' structure.~|~13 - Bridge Rehabilitation~|~4AA01191B37713098D3FC679E386EC756D25D258 110668~|~1~|~4~|~04/STR~|~Minor bridge rehab > 20' structure.~|~13 - Bridge Rehabilitation~|~3483631F6B6908A32321DA50C8F8DFFAB8E4C0B0 110668~|~1~|~5~|~05/STR~|~Minor bridge rehab 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~6633A7E8F64DFB6D5E5E2304DC4F97157015183C 110668~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3DCA6CBB4CF00492C9C617EB58AACB332C79E23C 110668~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~31D24E094611EBBE1BDC1CAB33FF5C20E2269F9C 110668~|~1~|~6~|~06/STR~|~New culverts.~|~04 - Reconstruction - No Added Capacity~|~6EE5AD06C31044C6787510E95407534C0D3386A2 75686~|~1~|~2~|~02/STR~|~This plan split includes all work asscoiated with the SWRWD pay items. SWRWD is providing 16% of the total cost of these items due a betterment.~|~44 - Other~|~33458FE6D54488F1391D087373185138CD0B7D6E 75686~|~1~|~1~|~01/STR~|~Drainage Improvement including 3900 feet of stream relocation from SLM 13.43 to 14.17 along SR 177 in Butler County. Also replace culverts BUT-177-1320 (a slab top culvert on stone abutments), BUT-177-13.79 (36" CMP) and repair/extend or replace BUT-177-13.29 (a 30" concrete pipe), BUT-177-13.45 (42" concrete pipe), and BUT-177-13.98 (15" concrete pipe). Resurface SR 177 from north of SR 73 to the Preble County line.~|~44 - Other~|~6069CBB2B17CC0675131319E80807398C5711450 113235~|~1~|~1~|~01/STR~|~ER Landslide repair project. MOE 78 12.35. MOE-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~33F360ABED413DFEB94741050800B6115FCA2773 88630~|~1~|~1~|~01/NHS~|~6200338 OTT SR2 18.3 Intersect: Portage River~|~17 - Construction Engineering~|~21B6B0F6D31BD8228860397AADBD443222527487 116490~|~1~|~1~|~01/NFP~|~D09 Culvert Project FY28.~|~21 - Safety~|~B655489D7F29B7344DBB48505715C3CEC352AF75 101301~|~1~|~1~|~01/SAF~|~Modify ramps at Interstate 675 and Dayton-Yellow Springs Rd~|~03 - Reconstruction - Added Capacity~|~1E9B2F8735A4A25EE12BE7A4651367873C543FC5 101301~|~1~|~2~|~02/SAF~|~Work that will covered by the OPWC funds.~|~03 - Reconstruction - Added Capacity~|~2AF1E6F48D4BF765F219E86339F9392D9AF158A0 101301~|~1~|~3~|~03/SAF~|~City is adding their name to the vandal fencing...to be paid 100% by the City.~|~03 - Reconstruction - Added Capacity~|~3DC535EB5B1E60FBC50FAECA2DA36B5CE748208D 106264~|~1~|~2~|~02/S>2~|~Columbus Urbanized Area Split: FRA-256-0.22-0.32~|~05 - 4R Maintenance - Resurfacing~|~9D2EFAB3F6570F7DCC5958A5F7FFE0A58193532C 106264~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-256-0.00-0.22, 0.32-1.20~|~05 - 4R Maintenance - Resurfacing~|~213D49423396A50AA1486D804333BAE132389D26 106264~|~1~|~3~|~03/S>2~|~Accounts for 100% City of Reynoldsburg cost items, such as pavement repairs, special striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~3ABE24DE153FA723904F3552004BB4154D6ADB6B 116779~|~1~|~1~|~01/S5K~|~Upgrade the traffic signal hardware at the IR 77 & SR 39 interchange at Dover in Tuscarawas County.~|~21 - Safety~|~DD6FB9312C8198DA94031CECFE181720785AB910 119081~|~1~|~1~|~01/STR~|~Plan split for project to rehabilitate bridge PRE-503-23.15 which carries SR 503 over Senora Verona Rd and an abandoned Railroad. Rehab will include installation of a new wearing surface, joint repairs, and barrier upgrades.~|~13 - Bridge Rehabilitation~|~B6B6F7F1A4FD0B0AAD0F328D162611C7ACF15E13 107395~|~1~|~1~|~01/NFP~|~D04 FY 2024 culvert repairs/replacements.~|~04 - Reconstruction - No Added Capacity~|~8007F27C8BC599841F83DE7BEE39CA491FE70DE5 99193~|~1~|~1~|~01/NFA~|~Highland County Various Routes PM~|~21 - Safety~|~0F23E891CD696D0E614AF908EDDB6A5B155C5B6F 94018~|~1~|~2~|~02/NHS~|~Minor bridge > 20' span.~|~~|~7DFA0C666B701A1F215C62AC33327F8E1555F70A 94018~|~1~|~1~|~01/NHS~|~Resurfacing in the City of Cuyahoga Falls, Stow, Hudson and the Village of Boston Heights, Summit County, Ohio.~|~~|~B0C7418CF26771E4CC284518F6EFBFB4841FA016 102075~|~1~|~1~|~01/BRO~|~Replace deck overlay and parapets, expansion joint repair~|~13 - Bridge Rehabilitation~|~4647D89CE5034BB517AADCD1C889BD8769BA1010 102075~|~1~|~2~|~02/NHS~|~Replace deck overlay and parapets, repair expansion joints~|~13 - Bridge Rehabilitation~|~AD5BC4652E4328783B4DA36C19F978F55EC61A80 88459~|~1~|~1~|~01/NFA~|~Sidewalk replacement or installation along the east and west sides of West Street, from West North Avenue to West Main Street (SR 46) and then along one side of Park Drive through City Park using SRTS funds.~|~01 - New Construction~|~F6DE0E5F6A49AF09A031E7AF36C0110E18B3B36E 113899~|~1~|~1~|~01/NFP~|~Created for TID involvement.~|~44 - Other~|~98FD084393CC0724C3B87EEC48BA771213D02914 121565~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~A267980217D5681E2A050C03FA969A62D77BA0F8 92108~|~1~|~1~|~01/BRF~|~Replace the structure (SFN 7144769) (0.05) on West Junction Road (CR213) 7144768 ROS CR213 7.96 Intersect: Middle Fork Salt CreekCDAO funds, 80 Fed/20 local match. 01/BRF/BR/ROS~|~10 - Bridge Replacement~|~58BA312BD2C163A3A416B1FE17A3C30CCFC32A8D 118423~|~1~|~1~|~01/STR~|~Plan split for construction items that are federally eligible.~|~10 - Bridge Replacement~|~E139838D9CCF55393B299EA63F5F49E2DFC5B952 123694~|~1~|~1~|~01/IMS~|~Temporary Shoring ~|~13 - Bridge Rehabilitation~|~E52860DDC24AB49FD447FC73E9D18C5B71E5A051 126201~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D903831632206CE3E3DCEEFE5BABE5285E1AB366 110082~|~1~|~1~|~01/NHS~|~Culvert and Storm Sewer repair/replacement~|~66 - Resilience Improvement - Highway Project ~|~C5A341B44C6A7D0402F620B9314050DB3D2975D7 102932~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~10 - Bridge Replacement~|~522BA9B8B2262027EA8BC8BF7126F52F84CE1D30 126319~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~~|~DE749206A3F2666E607735BEDF5671B54CF3C9D6 106261~|~1~|~1~|~01/SAF~|~Work eligible for federal-aid for the safety improvement of the intersection.~|~21 - Safety~|~9B3C693A0D4257970085FB3540F803C3C976163A 106261~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~134687B3F20EEDD0D36FB53C449F37B2210FDA28 122190~|~1~|~1~|~01/SAF~|~CEAO funded plan split for pavement markings~|~21 - Safety~|~585D21B2584BEF91132F566EEAE6ACD5C40CEF38 90154~|~1~|~1~|~01/SAF/MUSK~|~"01/SAE/OT/MCEO" - County Engineer's Association Organization Pavement Marking 4HB7(100% Federal) - CAP of $150,000.00 federal - Pavement Marking on routes to be determined~|~21 - Safety~|~FE6236BEFF77AA3CC988606E10B3D2223BD5639F 114350~|~1~|~1~|~01/BRF~|~Replacement of structure.~|~10 - Bridge Replacement~|~1033C7223D72549358AD04A9F728BB1384D08B3A 93950~|~1~|~1~|~01/NFA~|~District wide Raised Pavement Marker project 100% State ~|~21 - Safety~|~A2A10BA15279264CF7142934E87CFCD78C539F7C 121631~|~1~|~1~|~01/NFA~|~Pedestrian improvement~|~28 - Facilities for Pedestrians & Bicycles~|~5A7E3553D9C446F743A14A8663317045BD8D638B 100358~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~840BAA7200EBF6BCC74DC5DDFAA9B6029EC96B26 106859~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster STP Funds - 4TA7(80% fed) / LNTP (TRC 15% Federal) / LNTP (5% local) - No CAP - Resurfacing with related work in Lancaster on Fair Avenue (CR 54) from the 4.31 (Memorial Avenue) to 4.89 High Street.~|~05 - 4R Maintenance - Resurfacing~|~9E776AA15F04FB79F7FE0C379EF34F1508B833DB 95132~|~1~|~1~|~01/IMS~|~Type B Emergency for the repair of wearing surface of the southbound approach bridge to the Brent Spence Bridge on IR-71 (Bridge HAM-71-0000L, SFN 3105946) and the HAM-71-0159 (SFN 3106608) bridge on I-71 just North of the Lytle Tunnel.~|~13 - Bridge Rehabilitation~|~2A0C18DE842092D8469BC23EF493CAC59B7E46FF 96237~|~1~|~1~|~01/STR~|~STP Rural: SLM 0.00-8.68~|~05 - 4R Maintenance - Resurfacing~|~DDCFA37A3D47B398FE96CF9BB57304E3151B9F9D 117439~|~1~|~1~|~01/NFA~|~TR106 (Skinner Road) superstructure only CEAO funding~|~13 - Bridge Rehabilitation~|~5C10A4EE73161397025F379A19594FC2A9D063F8 18897~|~1~|~2~|~02/BRO~|~Bridge Painting RIC-030-07.55~|~13 - Bridge Rehabilitation~|~3DAF2BAC73AE2455E6C89DDD88C613B23DE8C709 18897~|~1~|~3~|~03/NHS~|~Bridge Painting - RIC-030-03.93 / RIC-030-09.82~|~13 - Bridge Rehabilitation~|~6EC30D53FE93B779D8BE8A97E939DEA0F730B66A 18897~|~1~|~1~|~01/IMS~|~Bridge Painting MED-071-06.75~|~44 - Other~|~873D7EBC6BE276414FB5B1D0A14DEB67073D71B0 102942~|~1~|~1~|~01/NHS~|~NHS eligible.~|~10 - Bridge Replacement~|~5C090160745CA693CA3D68C3E8BC830A385CFB0A 94274~|~1~|~1~|~01/ERD/SCE~|~Resurface the parking lot of the Everett Ranger Station located at 4683 Riverview Road, Summit County, Ohio. Pave the existing gravel parking lot, with striping, minor grading.~|~44 - Other~|~929EBF78628006DD9D1BA32AAEAFC0D1F6F654F2 119071~|~1~|~1~|~01/MPO~|~Construction of a new shared use path along Dawson Road between Miami Ave and Mcdonalds Commons~|~44 - Other~|~6159A76EC9760DE8F36EB0495B3572DBEACCD955 98245~|~1~|~1~|~01/NFA~|~Upgrade school signage and pedestiran crossings at 5 schools within the City.~|~21 - Safety~|~916FE98732D04C54B1C9E05E6E9B48D805C9840A 110696~|~1~|~1~|~01/IMS~|~Tentative Split for interstate locations~|~05 - 4R Maintenance - Resurfacing~|~462F462C5B3313157DB25BADC3B282690FE36D36 90537~|~1~|~3~|~03/STR~|~Remove the wearing course and seal the deck with SRS on SFN 5501245 MIA 55 0489.~|~13 - Bridge Rehabilitation~|~2044066A0F384B3101EB9B6C12CB9D37639F4501 90537~|~1~|~1~|~01/STR~|~Resurface existing roadway with asphalt concrete on SR 55 from SLM 3.79 to 7.67 segment length 3.88 = total lane miles 7.76. and on SR 48 SLM 8.97 to 9.24 segment length .270 = total lane miles .540~|~05 - 4R Maintenance - Resurfacing~|~49ED0DBCD7EE7A32AC46A0C65FBA8703D3E574E1 90537~|~1~|~2~|~02/S>2~|~Remove and replace existing roadway on SR 55 from SLM 3.79 to 8.20 segment length 4.41 = Total Lane miles 8.82.~|~05 - 4R Maintenance - Resurfacing~|~F4E2BF631376E483E03B9C348AB966A1FEA1EA24 99376~|~1~|~1~|~01/NHS~|~AFN 5440368, MER-33-0023, on Black Creek - remove asphalt wearing surface and water proofing from non-composite box beam structure. Install LMC hard overlay (non-composite) system. Patch structure "T" joints at piers. Patch pier delaminated area using SCC concrete.~|~13 - Bridge Rehabilitation~|~25B931D684D1A0482624FEC50015A20CFDCA4C1A 99376~|~1~|~2~|~02/STR~|~Removal of existing overlay and installation of new, reinforced, non-composite overlay.~|~~|~56A42DDD20779580487A7031FAE01B1DE6873DE7 102400~|~1~|~1~|~01/STR~|~424 Fine Graded Polymer Overlay~|~05 - 4R Maintenance - Resurfacing~|~EBBF31AD99B5C2D7C5F41FABA3704B2A0D907B27 127185~|~1~|~1~|~01/S5K~|~Guardrail installation on various county routes~|~21 - Safety~|~0076A6968DCD80619894BBBC8DF9C2BCFD55EE2D 103626~|~1~|~3~|~03/NHS~|~Work to replace railroad structure~|~10 - Bridge Replacement~|~28761BC7336C0C88F6E8434E79641B6876E69451 103626~|~1~|~4~|~04/NHS~|~Surface coarse on US 36 and SR 37 (Urban Paving)~|~05 - 4R Maintenance - Resurfacing~|~B7B1DC1BB6CD6A9C1AFE42F6D461B48F03F97F7C 103626~|~1~|~5~|~05/S>2~|~Surface course on SR 521 (Urban Paving)~|~05 - 4R Maintenance - Resurfacing~|~6308AAD374B7B4E5049CBAD7FF6E17C7124C6B13 103626~|~1~|~1~|~01/NHS~|~Roadway work on US 36 (William St and Sunbury Rd) and SR 37 (Central Ave) except surface coarse~|~04 - Reconstruction - No Added Capacity~|~29B9A40DC63EC8DC6330D9FFFD68F95E5ADCE90B 103626~|~1~|~2~|~02/S>2~|~Roadway work on SR 521 except surface coarse~|~04 - Reconstruction - No Added Capacity~|~5C9412FD9E52ECD0469817A3D76340BBC2C294BE 103626~|~1~|~6~|~06/ENH~|~Enhancement items.~|~31 - Landscaping & Other Scenic Beautification~|~EEA0EC5F05B223FC9BAFC8DF6F2290C199E5A234 103626~|~1~|~7~|~07/SAF~|~Install rumble stripes on US 36 east of Delaware~|~21 - Safety~|~DD11E4BE1759BB924FE38FE1D2B550AE7E9D2878 117914~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-A~|~~|~DE6C596F83B7BE3C49FC6504269646B749C5DFC1 118744~|~1~|~1~|~01/S5K~|~Slope and drainage repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ECA121894D82E5B2A7160BB92449FB8E1FF43A14 99191~|~1~|~1~|~01/SAF~|~ADA CR Various PM~|~21 - Safety~|~0DAA252CEC7C8D97DDB10CCA77F07A69E6BD1AB8 121678~|~1~|~1~|~01/S>2~|~Intersection improvement~|~04 - Reconstruction - No Added Capacity~|~21F114155E0ACBF3AECFF66C400F209D164076C8 94129~|~1~|~2~|~02/STR~|~Resurfacing of STA SR 44 from SLM 16.49 to 19.41.~|~~|~2F5BC59C347AA50E834EE1B1A9164EAC2FE3BC59 94129~|~1~|~3~|~03/STR~|~Bridge Maintenance SFN 7601875 SR SLM 18.43 over over Reed Ditch.~|~~|~D63456D165AD295FD465149B4A92C5A9B5E9A560 94129~|~1~|~1~|~01/S>2~|~Resurfacing of STA SR 44 from SLM 14.66 to 16.49.~|~~|~FC7B568367F1C714B3104226661FB8B2AF033419 97182~|~1~|~3~|~03/IMS~|~Funding to paint the clearance gages along the Combs-Hehl Bridge.~|~47 - Bridge Preventive Maintenance~|~0622B3B2A03386F8A07A8AAB8FB056F8DC1A57DD 97182~|~1~|~2~|~02/IMS~|~Funding to paint the clearance gages along the Dan Beard Bridges.~|~47 - Bridge Preventive Maintenance~|~086F09E2BC8263302B776373EEDD81303FEF5697 97182~|~1~|~1~|~01/IMS~|~Funding to pay for painting the clearance gages along the Brent Spence Bridge.~|~47 - Bridge Preventive Maintenance~|~DE50E4DC3F3F3D9999DA8A7D6E2F34503D148459 107233~|~1~|~4~|~04/NFA~|~Resurfacing project using an asphalt overlay treatment. Not on the federal aid system - Local Road. GAL CR 40 1.00-1.20. Funded 100% Local.~|~05 - 4R Maintenance - Resurfacing~|~512C99D540646D7C5FB30D54862168E5C6C3E1CD 107233~|~1~|~3~|~03/NFA~|~Resurfacing project using an asphalt overlay treatment. GAL CR 15 0.00-1.31, GAL CR 20 2.93-4.23, 9.60-10.59 and GAL CR 143 3.51-6.19. Not on the federal aid system - Minor Collector. Funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~CED8911D4C3CCC82CF3A5B7CC145FB3916AE5629 107233~|~1~|~1~|~01/S<2~|~Resurfacing project using an asphalt overlay treatment. GAL CR 3 0.00-0.77, GAL CR 10 0.00-0.46, GAL CR 20 10.59-10.80 and GAL CR 35 1.82-4.16. Urban other federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~4836D30D127ED28B3329B697FA3E23D4E593F56F 107233~|~1~|~2~|~02/STR~|~Resurfacing project using an asphalt overlay treatment. GAL CR 3 0.77-4.93, GAL CR 10 0.46-3.10, GAL CR 20 2.84-2.93, GAL CR 42 0.00-1.66 and GAL CR 50 6.36-10.35, 10.47-12.73, 13.67-15.96. Rural other federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~C4E3A24764567A55D631EF270C719A8825F8CE4F 104821~|~1~|~1~|~01/S<2~|~Consultant Construction Inspection~|~~|~2307AF4D360192BE4D67D9B8528D10714A90DD90 111303~|~1~|~1~|~01/MPO~|~MPO funded Plans split~|~04 - Reconstruction - No Added Capacity~|~808167120223EAF9C084A071F41B47EB94CEE95B 111303~|~1~|~2~|~02/NFP~|~100% local funded split~|~04 - Reconstruction - No Added Capacity~|~98FCC91B09B53C8376B6B794EC4DD3CFB465D805 98685~|~1~|~1~|~01/S>2~|~This plan split covers all roadway work included in the project. Old Red Bank Road from Red Bank Expressway to MedPace Way.~|~04 - Reconstruction - No Added Capacity~|~07393217EE1AC6105A04CFEE938DA1C2278DBAC8 98685~|~1~|~2~|~02/S>2~|~Plan Split for the new bridge over the RR. No SFN at this time.~|~04 - Reconstruction - No Added Capacity~|~A5BE800AC99180CDF276D8381C422D2D990BA801 97450~|~1~|~2~|~02/NHS~|~FY2017 Urban Paving Project in the City of Lebanon. This plan split is for SR 48 where the pay items are 100% City.~|~05 - 4R Maintenance - Resurfacing~|~0A062B721AEC09AC584EC2E04DBAF3A40B8096FB 97450~|~1~|~1~|~01/NHS~|~FY2017 Urban Paving Project in the City of Lebanon. This plan split is for SR 48 where the pay items are split 80% State and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~AA22A0CB220D76788C487661B44E3C5F0C9829C5 109845~|~1~|~1~|~01/NHS~|~SCI 52 33.82-39.63LAW 52 0.00-2.17~|~05 - 4R Maintenance - Resurfacing~|~533371BEAEB62FECAE7F4F322294FC92DEB126F8 109845~|~1~|~2~|~02/NHS~|~Bridge Maintenance ~|~47 - Bridge Preventive Maintenance~|~81F887392DB89E4047BEFEAB956D25491196DA0B 109845~|~1~|~3~|~03/SAE~|~Recessed-Wet Reflective Pavement Markings.~|~21 - Safety~|~EFCD7A61FDA1DD803AE03C4166339601DDE86B58 109845~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~1018426FDD6FA9EA70FC2B09B2861E10D20D7BD7 103201~|~1~|~1~|~01/IMS~|~Slide repair at Diamond (SLM 20.18 to 20.31).~|~44 - Other~|~225DA00E13A29DB84DE7456DC48D392C054938FA 96242~|~1~|~1~|~01/S>2~|~STP>2. SLM 0.00-3.17~|~05 - 4R Maintenance - Resurfacing~|~7990D6EC81D0F004F87D8C85F6DF1E87651ACB59 85131~|~1~|~2~|~02/STR~|~RURAL portion of Vrooman Rd to be funding with County STP funds.~|~04 - Reconstruction - No Added Capacity~|~64BD78EC936BE70418BD9539E6A32B057C119187 85131~|~1~|~3~|~03/NHS~|~Urban portion of Vrooman w/NHS classification funded with County STP funds.~|~04 - Reconstruction - No Added Capacity~|~914A4239607DD1624936A9355426687793B972B1 85131~|~1~|~1~|~01/S>2~|~URBAN portion of Vrooman funded with County STP funds.~|~04 - Reconstruction - No Added Capacity~|~9C3E96CC75D9A1122C2AAB351F0E9671732E12A2 117150~|~1~|~1~|~01/SAF~|~Safety funded pedestrian improvements, including sidewalks and enhanced crossing~|~21 - Safety~|~10C15119FA1030ABCBB4FD85A976CC6818BFB35C 117901~|~1~|~1~|~01/NFA~|~NEVI Round 1, CG 70-A - Preble County~|~63 - Electric Vehicles & Charging Infrastructure~|~9B0283676A5471A57EB80C2AE4FA70F2B3C87146 92012~|~1~|~1~|~01/NHS~|~Pavement ResurfacingLAW 7 (0.00-2.30)LAW 52 (18.00-22.53 Joint Work)LAW 527 (0.00-0.56)~|~05 - 4R Maintenance - Resurfacing~|~14BA6CED93547BAD734B805722BE68A81A12AC30 92012~|~1~|~2~|~02/NHS~|~Bridge Preventative MaintenanceLAW SR 7 1.85 (SFN 4400054)LAW SR 7 1.86 (SFN 4400046)LAW SR 7 2.16 (SFN 4404092)LAW SR 527 0.20 (SFN 4404041)LAW SR 527 0.21 (SFN 4404076)~|~05 - 4R Maintenance - Resurfacing~|~8EBEE9001984ED1F9ECB578F67AD0ACC64C91F6F 92012~|~1~|~3~|~03/SAF~|~Safety Related ResurfacingLAW 52 18.00-22.53~|~21 - Safety~|~6D1EC7C48DD13E50CFFB8A803009A89628B39F2F 92012~|~1~|~4~|~04/NHS~|~Added using 100% state. This is for material buyback due to unforeseen project conditions.~|~~|~8700F36F6AC18DA8B2CFD1D9EF3F9808F21FAEF0 79319~|~1~|~2~|~02/NHS~|~Federal/Local funding for Columbus urban paving (within City of Columbus)SLM 7.04-10.69, 10.91-12.41~|~05 - 4R Maintenance - Resurfacing~|~4B3508FF01391814CC7E5C80F867A8FCA3D0CA40 79319~|~1~|~4~|~04/IMS~|~90/10 D6 federal/state funding for sealing and patching on:2500353 FRA IR270 8.08 Intersect: Over I-270~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A7170B397247FEC96DF72091357538465556DD9E 79319~|~1~|~1~|~01/NHS~|~80/20 Federal/State funding for general system paving, SLM 10.69-10.91 (area not in Columbus)~|~05 - 4R Maintenance - Resurfacing~|~DEF64C80E2AD97DA0F6124D4D1B57D19274EEB0C 79319~|~1~|~3~|~03/NHS/COL~|~100% Columbus funded items: curb ramps, drainage, pvmt repair, valve box adjusted, ped signals~|~05 - 4R Maintenance - Resurfacing~|~EC591847253C1E923DF67ED80051241001237C24 79319~|~1~|~5~|~05/NHS~|~80/20 D6 federal/state funding for sealing on:2500396 FRA SR16 10.25 Intersect: Over Blacklick Ck80/20 D6 federal/state funding for sealing & patching on:2500337 FRA SR 16 7.41 Intersect: Over Big Walnut Creek~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FD8ECFBC55B8FF539652E168F72FFC77568776E6 102503~|~1~|~1~|~01/STR~|~Major rehab of BEL-148 pavement~|~04 - Reconstruction - No Added Capacity~|~87185FE1FB8DB450A24DDE317712BC0BFD795F55 102503~|~2~|~2~|~02/STR~|~Split #2 added for part #2 culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~858B067D11FBA1279BFFB875C2331E00D421CCDB 100999~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - resurfacing and related work on GUE-265-4.59 to 17.63; NOB-265-0.00 to 0.32, BEL-265-0.00 to 0.41.~|~05 - 4R Maintenance - Resurfacing~|~56500A259FFA74240DB8C278A6C86B513B978EDB 100999~|~1~|~2~|~02/NFA~|~District Preservation 4PS7 (100% State) - No CAP - resurfacing and related work on MUS-376-0.00 to 5.30.~|~05 - 4R Maintenance - Resurfacing~|~80FE8AFC7DCE66DDEEEA3B1412B1FAB08BD54E21 100999~|~1~|~3~|~03/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Deck Patching work on GUE-265-12.49 (SFN 3004937);GUE-265-13.43 (SFN 3004953);~|~13 - Bridge Rehabilitation~|~70B9C5E23CEDD449AF9CD1DCFC4DEF5824AFA41C 97418~|~1~|~1~|~01/S>2~|~Replace SFN 7841175 TRU-CR 56-3.10 Niles Vienna Rd over Liberty Lake Stream.~|~10 - Bridge Replacement~|~045A1455F0B358C465D14A5AD9D3454536CFC710 97418~|~1~|~3~|~03/NFA~|~Replace SFN 7841272 TRU-TR 33-3.31 Pleasant Valley Rd over Squaw Creek.~|~10 - Bridge Replacement~|~6153414D26FFB18AFB4036BC84BAC3E38B37DDC1 97418~|~1~|~2~|~02/NFA~|~Replace SFN 7835248 TRU-CR 108-04.21 Risher Rd over Duck Creek. ~|~10 - Bridge Replacement~|~C20C54D82BFAD4B2DCD96662DAB637E4B183C0B3 88820~|~1~|~1~|~01/SAE~|~Install by contract traffic signals in Disitrct 8 for FY2017.~|~21 - Safety~|~03E592FF1A7B7DC159A9F6B353A6792AC586F490 125518~|~1~|~1~|~01/STR~|~bridge repair.~|~13 - Bridge Rehabilitation~|~CBD89025B4D5BBEFE9A57AB4E238A235AA66A669 106723~|~1~|~1~|~01/SAF~|~Work to improve pedestrian and bicycle access in the City of Strongsville that is eligible for federal-aid.~|~28 - Facilities for Pedestrians & Bicycles~|~DB700581C3DFE676E93FC67A678134783E129CEB 86837~|~1~|~3~|~03/S<2~|~100% City of Oberlin Items~|~05 - 4R Maintenance - Resurfacing~|~38C35842393507FB55CA14ADB46F4B75FE588C3A 86837~|~1~|~4~|~04/NHS/OBLN~|~Urban Paving - NHS - SR 58 - 80/20 - District Allocation/City of Oberlin~|~05 - 4R Maintenance - Resurfacing~|~72172DF3366F1900F03AF6F30375B9F67AE68A50 86837~|~1~|~2~|~02/S<2~|~Resurfacing not within City of Oberlin Corp Limits.~|~05 - 4R Maintenance - Resurfacing~|~73DF1C5F08F3458FAD16235FDFA2EEB2DD84D826 86837~|~1~|~1~|~01/S<2/OBLN~|~Urban Paving - STP - SR 511 - 80/20 - District Allocation/City of Oberlin~|~05 - 4R Maintenance - Resurfacing~|~8C33D8A8EF76E5388CA6EA9F3C9D85144CF572F0 11230~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work on this project.~|~~|~DF2521259E3A315B0BCC05B4E77976049744A8EA 117120~|~1~|~1~|~01/MPO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F5910E697618CFD46BBD3F973A49FA77DC1C56D3 125519~|~1~|~3~|~03/STR~|~Chip sealing.~|~05 - 4R Maintenance - Resurfacing~|~5403CCA284305B8C977D6A75B7CA79D944B4C7E9 125519~|~1~|~1~|~01/S>2~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~130B609E1F4DF22E910015C50F0DFC0485B6FDBA 125519~|~1~|~2~|~02/S5K~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~77DF7C44933ECB55971788F7B24951A15565A519 121935~|~1~|~1~|~01/STR~|~Roadside Safety improvements utilizing Bel-O-Mar STBG funds at 100%.~|~21 - Safety~|~75331024BE4FAD52168B799E725BCEB544D98CF1 93803~|~1~|~1~|~01/IMS~|~Connector Rd bridge over IR-280, SFN 8705771~|~13 - Bridge Rehabilitation~|~A6641148CF6A60C42E1DAFDF92F14BC07F34B7BB 110035~|~1~|~1~|~01/NHS~|~Emergency Repairs of Steel beams due to over height vehicle hit.~|~13 - Bridge Rehabilitation~|~4718877C154205D04F325B1DC5A16C373BAB0684 109820~|~1~|~1~|~01/NFA~|~ADA 770 6.90-10.52~|~05 - 4R Maintenance - Resurfacing~|~ED1086CCEC7D6FB7865B32EEE2C5C418C4C95048 88966~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert Replacement of: 1) 6004776 MUS SR146 17.98 Intersect: Sr146 Over Ditch: Not BR Eligible L=12' SD/FO(1) SR=27.6 DSR=5;~|~10 - Bridge Replacement~|~8DE7FA84B692BBA40D1E8A29E4996F4D08BF46CB 88966~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Culvert Replacement of: 1) 6005136 MUS SR146 27.73 Intersect: Over Br Buffalo Fork: Not BR Eligible L-18' SD/FO(1) SR=72.2 DSR="N";~|~10 - Bridge Replacement~|~C22B57A9BBF883B92928C4B87405B51B42EA7B1E 118601~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~0345ED9B6F2276D9E15F548BAE6BBF1132F0A3EF 86991~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a fine graded polymer treatment. HOC 93 0.00-7.31 and VIN 18.08-18.57. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2593035274C6179C5CF3D6B3D1EEC55DAEB3588A 120070~|~1~|~1~|~01/NFA~|~NEVI Round 2 71-A~|~63 - Electric Vehicles & Charging Infrastructure~|~730CD8B62ECEA74121755D49D2E382308075F385 124606~|~1~|~1~|~01/ENH~|~Construction of new sidewalk and corresponding ADA facilities utilizing (80%) Safe Routes to School funds and (20%) Toll Revenue Credit up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~E0680EA516E09D86EBAA048E15524FC9D04142D5 101630~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Plan Split for replacement of security gates and controllers at D05 headquarters.~|~~|~B8E4B2859EDF2795C719ACC9D98DEDC8C9BF571F 109550~|~1~|~1~|~01/SAF~|~Upgrade intersection of MAR SR 98 at SR 529~|~21 - Safety~|~E5F134D3C540C67797DBA6B7593F3169D21DDD0B 109550~|~1~|~2~|~02/STR~|~Replace existing 36" storm sewer with a 48" sewer. District Preservation funds to cover cost of upsizing sewer and removal of existing 36"~|~21 - Safety~|~1CF2272C7734245CA3C2A22AC0AF5B4A4140DAE9 101420~|~1~|~1~|~01/IMS~|~AC Overlay with repairs - CLE IR 275 SLM 8.90 to 11.40~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE7B4DEA57C8DBAFF8345DBF40FE54689F424490 95453~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~ED9912F614B97EDC7C2A66349F15666394C19642 107260~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 260 1.48. GSM funded. Not on any federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B34F342E115B101199BD178EE696F1A5DCAE1252 113013~|~1~|~1~|~01/SAF~|~ROS 159 (Bridge St & US35 EB Ramp) safety project.~|~21 - Safety~|~00DE9F7438B24315B85970DDD6E0FBCFB8FCFE30 113013~|~1~|~4~|~04/SAF~|~Sidewalk along the project~|~28 - Facilities for Pedestrians & Bicycles~|~CF42E794B1C2612577DA4DA786A2E721C85FAD4C 113013~|~1~|~3~|~03/S5K~|~Bridge St. Bridge Sidewalk addition.Major Bridge Funding.~|~28 - Facilities for Pedestrians & Bicycles~|~DE985FE68794BE469D65BBEABA3526D9367B433A 113013~|~1~|~2~|~02/S5K~|~ROS 159 (0.74-1.50) Pavement workMajor 2 funding~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~04B81D33EF5FE546834FF3EBE5046DDA1ACB0538 113013~|~1~|~5~|~05/NFP~|~Added a plan split for the local aesthetic items. ~|~21 - Safety~|~44F128C60EC2FCB37E49F2414726D633AF60804B 102848~|~1~|~1~|~01/NFA~|~D09 Deck Sealing Project FY2022~|~13 - Bridge Rehabilitation~|~470F278833C9E94AB1E2D9320D6FE76F933BBBCC 117910~|~1~|~1~|~01/NFA~|~NEVI I-70-C, FRAN 112-140~|~63 - Electric Vehicles & Charging Infrastructure~|~368B8585C44208D8974EA3DE2D6A74A5241C3CF1 99588~|~1~|~1~|~01/S5K~|~SR-163 from SLM 31.07 to 33.85 and SLM 33.98 to 39.815~|~04 - Reconstruction - No Added Capacity~|~5630A64DD93C14F5B7A268BED1FB8B5429E273BE 99588~|~1~|~2~|~02/STR~|~SR-163 from SLM 39.815 to 41.427~|~04 - Reconstruction - No Added Capacity~|~8DC21F761E2F9EBB68F3D507A7CB6F2CAC8A8C8F 87024~|~1~|~1~|~01/S>2~|~Install by contract traffic signals at various locations for FY2013-2014. This Plan Split is for the Urban Locations.~|~21 - Safety~|~153DBD695EA2B01CF70F6FFB07B7647F9B55B610 87024~|~1~|~2~|~02/STR~|~Install by contract traffic signals at various locations for FY2013-2014. This Plan Split is for the Rural Locations.~|~21 - Safety~|~9E19ED397823BC83BDEFD40CBC8C9BC2B7FA2C5F 97046~|~1~|~3~|~03/SAF~|~centerline Rumble Stripes LOR-083-04.17 - 10.49~|~05 - 4R Maintenance - Resurfacing~|~C30009043E99EA29DD06FA69A285AE777AC3AB73 97046~|~1~|~1~|~01/STR~|~AC Overlay w/Rpr LOR SR 83 5.21 to 6.50, 4.17 to 5.21 and 6.50 to 10.49~|~05 - 4R Maintenance - Resurfacing~|~03FA9ED29498261CBEF5682709FA2A78AEB432B1 97046~|~1~|~2~|~02/STR~|~Bridge work:LOR-SR-83 06.820 SFN 4704037 BANNISTER DITCH Minor Rehabilitation: Slope repair & prot (082)LOR-SR-83 07.690 SFN 4704061 WILLOW CREEK Preventive Maintenance: Bridge railing upgrade/repair (061)~|~13 - Bridge Rehabilitation~|~872641F0E75E4EC894AAAB9CCFD0837E3B9FC8AD 109114~|~1~|~1~|~01/SAF~|~Intersection safety improvements.~|~21 - Safety~|~7A23CF316CEB777D200A81D1B365E080B972A88F 111075~|~1~|~1~|~01/STR~|~GSM funding plan split~|~44 - Other~|~DC77EAE0698D68868F7A26846DBD6A26C3A263C2 126639~|~1~|~1~|~01/ENH/TRCU~|~New sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~395FF584DDE581F5C461B3C2A55B7323E85508F1 85267~|~1~|~1~|~01/STR~|~Replace culvert on US-20A @ SLM 1.87 in Williams County.~|~44 - Other~|~49881172D1673FF4FC7F39657CFBC549BB152A37 120593~|~1~|~1~|~01/NFA/KCEO~|~Replacement of structure carrying CR 89 over Dry Creek.~|~10 - Bridge Replacement~|~D7986ED24AFC82C1083E8B26BCCEF85349F14A60 124011~|~1~|~1~|~01/ENH~|~Shared Use Path utilizing Federal TAP (80)/Safety (20) funds at 100% up to Federal funding cap.~|~28 - Facilities for Pedestrians & Bicycles~|~74F3A41FB16721DFA1FFC4B307D19DAB192B024D 124712~|~1~|~1~|~01/NHS~|~Plan split for work associated with rehabilitation of federal bridge on NHS route.~|~13 - Bridge Rehabilitation~|~93DE8E68F90A36DA6371A1AD3339F84914FCE6E1 82392~|~1~|~2~|~02/IMS~|~Structures not eligible for BR funding: 1808079, 1808133, 1808168~|~01 - New Construction~|~056EE4B6201404875D45EA0A141946B774CFEF99 82392~|~1~|~1~|~01/IMS~|~Structure eligible for BR funding: 1808109~|~01 - New Construction~|~356B668AC5368B7B28AB2D58F0D5D5DDFAC1E795 93390~|~1~|~1~|~01/STR~|~District Allocation~|~~|~4928210842490B11EA371E4E5FA3EAD41066F426 105863~|~1~|~1~|~01/IMS~|~Added plan split.~|~44 - Other~|~1E965375DD4610D94CCB912FB609C71D7DF59F78 119895~|~1~|~1~|~01/NFA~|~NEVI Round 2 23-B~|~63 - Electric Vehicles & Charging Infrastructure~|~72EAAB82AE008F25222515F2F52A1C8457CFF6DD 113083~|~1~|~1~|~01/SAF~|~District-wide polyester pavement markers.~|~21 - Safety~|~D1D58567BA1112066FCE5118207F13CA5572D8E4 121333~|~1~|~1~|~01/NFP~|~Created for TID Involvement~|~44 - Other~|~52CAEF4831FB3F1E949957559E2FAAEC563622D9 113517~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~~|~A8DC45AD2D165A8D772B131149AA714F6EA07FCE 98214~|~1~|~1~|~01/NFP~|~Electrical maintenance contract throughout District Six~|~44 - Other~|~C73EB57E13A54627241A6CB203F976EC49941A45 96128~|~1~|~1~|~01/NFA~|~Construct a new 3,000 ton salt storage building at a new Montgomery County Outpost Facility.~|~44 - Other~|~FA4BD978AB62DEDBC2E6724B4EEF09496F0561E9 120912~|~1~|~1~|~01/NFP~|~Culvert replacements/repairs.~|~04 - Reconstruction - No Added Capacity~|~81CE69C1927FA679217D33CD23CD307A7DF53D0A 98021~|~1~|~1~|~01/STR~|~Culvert repair project. ATH 691 5.24 (CFN 1867803), HOC 664 1.70 (CFN 1802341), HOC 664 5.52 (CFN 1876198). Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~31B738466B0AB0C432F3CDEC95065DB08C78A78C 98021~|~1~|~2~|~02/NFA~|~Culvert repair project. MRG 376 15.56 (CFN 1845396), MRG 555 14.54 (CFN 1861943). Not on the federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F1C759C7D080906E9A74318E759E6854A05916B6 87663~|~1~|~1~|~01/STR~|~Reconstruction of the existing roadway and other roadway related items, full depth removal of roadway, removal and replacemetn of curb and sidewalk left side only, replacement of existing storm sewer on SR 119 from McCartyville Road (SLM 4.20) to Renee Road (SLM 4.48).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF113766F93B8365B12DAC62BCBF2651C9AC91B6 114631~|~1~|~1~|~01/NHS~|~Overlay on ROS 23.~|~05 - 4R Maintenance - Resurfacing~|~2E89741238B53449A5133B8635DAE032A3D460E2 83036~|~1~|~1~|~01/IMS~|~Resurfacing SUM IR 77 from 9.84 to 12.16~|~05 - 4R Maintenance - Resurfacing~|~148BC5FC1CED467FF7F75E57D8E8575A1F6C1F92 83036~|~1~|~2~|~02/IMS~|~Concrete Deck Patching and Spall Removal on the following structures:SFN 7705972 SUM-IR 76-11.48R over SUM IR 77, SFN 7706065 SUM-IR 76-11.65L over IR 76 WB, SFN 7706006 SUM-IR 76-11.50L over SUM IR 77, SFN 7706030 SUM-IR 76-11.52R over IR 76, SFN 7702736 SUM-IR 77-9.73R over Waterloo Rd, 7702701 SUM-IR 77-9.73L over Waterloo Rd.Concrete Deck Overlay to the following structures:SFN 7702760 SUM-IR 77-10.20 Under Catawba Ave, SFN 7702825 SUM-IR 77-11.28 Under Cole Ave, SFN 7702914 SUM-IR 77-11.50 Under Lovers Lane, SFN 7702949 SUM-IR 77-11.84 Under Lafollette Ave, SFN 7711220 SUM-SR 764-2.14 over IR 77 Asphalt Deck Overlay with waterproofing to the following structures:SFN 7702795 SUM-IR 77-10.79 over Firestone Blvd, SFN 7702884 SUM IR 77 10.94 over Archwood AveDeck Sealing to the following structures:SFN 7702973 SFN SUM-IR 77-12.01R over SUM SR 8, SFN 7700040 SUM-SR 8-0.23L (Ramp S - SR 8 SB to I-76 EB)Repair deteriorating panels and seal joints on top of the MSE walls for SFN 7706243 SUM-IR 76-12.30 over Arlington St.~|~13 - Bridge Rehabilitation~|~9184F993D0B85E414D1D4EEAC54F49B3798B59BE 113929~|~1~|~1~|~01/NFP~|~Construction engineering and testing tasks not attributable to a specific PID~|~17 - Construction Engineering~|~A5AD9D43C0C68E4BD6A3A0C158BBDD55C87974B2 110061~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 25 & 26~|~17 - Construction Engineering~|~9663BFEBE1BF85CB132EDFAC463BD7EE7FDF6ECC 94319~|~1~|~1~|~01/STR~|~Resurfacing from SLM 5.94 to SLM 14.96.~|~05 - 4R Maintenance - Resurfacing~|~6A1EA5BB920FBF603D72B35891B59089E0DFCC51 94319~|~1~|~2~|~02/STR~|~Bridges HEN-108-9.04 Bridge Replacement~|~10 - Bridge Replacement~|~760E5A6A4B39259EC720AC1EC419F7CA5C00F20E 94319~|~1~|~3~|~03/STR~|~Plan split for Bridge Repair - Hen-108-8.25, 8.74 & 10.23~|~13 - Bridge Rehabilitation~|~597D6B262970D4C70FE42421105896A37C5A09FB 94319~|~1~|~4~|~04/S<2~|~This split is for the Urban Paving ( Fed/Lcl ) section within the City of Napoleon - SR 108 between Perry ( SLM 14.96 ) and Maumee River bridge ( SLM 15.59 )~|~05 - 4R Maintenance - Resurfacing~|~6E5384CA61EF511BE78D6EF89C8E689CF0CB7882 94319~|~1~|~5~|~05/S<2~|~Plan Split for the 100% City Costs in the Urban Paving section.~|~05 - 4R Maintenance - Resurfacing~|~8CEF18605093D7C78DF67449EBEABB5699252166 99020~|~1~|~1~|~01/SAF~|~District wide polyester pavement marking~|~21 - Safety~|~5B7064B385A8EE5195FB39DA179EAECAC1A86549 93022~|~1~|~2~|~02/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Abutment repairs at GUE-77-1.11L/R, top of back wall repair on GUE-77-1.43 L and R, forward abutment repair GUE-77-1.43 L~|~47 - Bridge Preventive Maintenance~|~5A60C01BFEE3329BADE1CFF0B240D89D216597FF 93022~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 7BPB/4PS7(10% State) - See CAP comments - Resurfacing with related work on Gue-IR 77-00.00 to 02.51~|~05 - 4R Maintenance - Resurfacing~|~568A831BAE31E64CB15664ABAE7D5CA4F6AD935F 93022~|~1~|~3~|~03/IMS~|~Facilities Rest Area Funding 4BR7(100% State) - See CAP Comment -Resurfacing with repairs of Gue-IR 77 SB Rest Area Park 30.~|~05 - 4R Maintenance - Resurfacing~|~939D91B4C2719BA222A36CE872BD0E310BA81F86 93022~|~1~|~4~|~04/IMS~|~Facilities State ADA Funds - 4AC7 (100% State) - See CAP Comment - ADA upgrades to rest area along SB IR 77.~|~44 - Other~|~7942569FF2A64118EB3403FD6CD510B9F6E1F918 110169~|~1~|~1~|~01/STR~|~Replace conduits.~|~~|~CE67EC74D98022EF9BDA252F9CB385C1C213A512 126770~|~1~|~1~|~01/S>2~|~Federal items~|~47 - Bridge Preventive Maintenance~|~E7291F8DF584A33421BBC387D7BE3615395F5ABE 117345~|~1~|~1~|~01/BRO~|~Primary Plan Split for Local Bridge Program eligible scope items~|~13 - Bridge Rehabilitation~|~530F40B94FFA1D44F7CA4FC4D541F45A56FC0B34 109346~|~1~|~1~|~01/NFP~|~ODNR resurfacing project at Fort Meigs~|~05 - 4R Maintenance - Resurfacing~|~9F57B07C435959AB83682913A6C1F7D60895F910 97090~|~1~|~1~|~01/NFP~|~Bridge replacement project funded by CEAO. MRG CR 35-S 4.79, SFN 5837251. Approach work on both sides is included. Funded 80 federal/20 local.~|~10 - Bridge Replacement~|~D5CC2D76F6BA39757E69832BCEFF8AAB57A3A202 118852~|~1~|~2~|~02/STR~|~Added plan split for Mount Orab pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~97EF6CCD2C0045096606A4E4D2D14F6C08B0ABC5 118852~|~1~|~1~|~01/STR~|~added plan split for resurfacing of roadway and bridge work on route 68.~|~05 - 4R Maintenance - Resurfacing~|~5BF41312CA7794D160D1843C9C22EEFF0B14B625 119197~|~1~|~1~|~01/STR~|~Crack Seal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~72EF84F9F9BF9E0C99A075798EBA4A4D236A290E 119491~|~1~|~1~|~01/NFP~|~Repair of superstructure and railing~|~13 - Bridge Rehabilitation~|~D338E6DDD3C3AE19E3800FA5D69CF393068FD8CF 125810~|~1~|~1~|~01/IMS~|~Signs~|~44 - Other~|~A43D5D83CDF6A80802EE7F7B1813E4B9D66EE0B8 94557~|~1~|~1~|~01/IMS~|~MOT-75-1503 SFN 5708648 - Replace expansion joints, paint structural steel, replace abutment bearings.MOT-75-1554 SFN 5708761 - Replace bridge deck (possibly widen for SB ramp) paint steel.MOT-75-1582 SFN 5708796 - Replace bridge deck and paint steel.~|~~|~903720F4776DEF14D60445280B2F1F6E22894DA8 94557~|~1~|~2~|~02/IMS~|~MOT IR 75 SLM 14.85 to 15.24 - Improve profile and superelevation of mainline roadway within the Stanley Avenue interchange.~|~~|~FD2E7380603712E0E7BD5DCD14F0F83C47090D06 96187~|~1~|~1~|~01/NFP~|~Construct a salt dome storage in the Vrooman Outpost in Lake County~|~44 - Other~|~C205FDC8E0F8CFCE1A663CC12678B785451497D6 107709~|~1~|~1~|~01/IMS~|~WOO-280-0.73~|~13 - Bridge Rehabilitation~|~117376A0C0D28ED6B609F02F319D5482D6ED73BC 91410~|~1~|~1~|~01/STR~|~Brdg replacement. south of Pike County Line on SR335.7305168 SCI SR335 13.61 Intersect: Stream80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~159D1D4676C868A3DF286088B08DE6CB484C5A66 97677~|~1~|~1~|~01/STR~|~Construct retaining wall to stop erosion~|~44 - Other~|~0904DA6E0E2CCC49E97CD97AF4E6F480BCC2F322 103707~|~1~|~1~|~01/SAF~|~Work eligible for SRTS infrastructure funding~|~28 - Facilities for Pedestrians & Bicycles~|~CE3C4400D739726C88166F7D1309EC0139A0E599 120463~|~1~|~1~|~01/NFP~|~ODNR funded project to resurface entire paved areas at Zaleski State Forest. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~D745A9EF591BD2A357E5FCCF898CD011068F81F2 23905~|~1~|~3~|~03/IMS~|~Plan Split to cover pavement markings.~|~~|~3D897C325CCF5D569C672976DA2F51E8D8D3E4CC 23905~|~1~|~1~|~01/IMS~|~Plan Split for MAH IR 680 12.10 to 16.43.~|~~|~892AB958FC8878EB60051BE046D77AE170AE58C7 23905~|~1~|~2~|~02/IMS~|~Plan Split for SFN 5007747 MAH IR 680 12.40 over Branch of Yellow Creek, SFN 5007763 MAH IR 680 13.23 under East Ohio Gas Line, SFN 5007860 & 5007879 MAH IR 680 15.40 L&R over Calla Rd, and SFN MAH IR 680 13.38 under Walker Mill Rd~|~~|~F904BE18556B1CD5CB4AC27C646BFFE0857B83A4 120899~|~1~|~1~|~01/NFP~|~Pave overflow parking lot at park district ~|~44 - Other~|~50E605BA412431FFBD64C7E796A89A9136E14C74 98384~|~1~|~1~|~01/STR~|~CRA-602-0.00 to 4.25~|~05 - 4R Maintenance - Resurfacing~|~10C93D4D065924A9415B4F496E89125DE8329F96 100177~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 56 6.70. Rural other federal aid funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EC231801F886DC4F707950B1583FCF999C040EBC 125635~|~1~|~1~|~01/STR~|~Bridge replacement~|~10 - Bridge Replacement~|~41EC106278C22C9C6301A05BBC4AF71D27467BB5 125719~|~1~|~1~|~01/IMS~|~Various bridges throughout district 6~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5BA028604BD4CAC67559B50C5E8B78DE2F7218C5 97897~|~1~|~1~|~01/S<2~|~CR609 (OM 038) Roadway improvements will include a 2" mill and overlay of the existing asphalt surface course. Once the underlying concrete base has been exposed, the concrete will be inspected and deteriorated concrete joints will be repaired. After the bad concrete base has been repaired, a new asphalt surface will be applied.~|~05 - 4R Maintenance - Resurfacing~|~AEBCD44856618525DA7D0BFCA3C99FB0DEE5C81C 125044~|~1~|~1~|~01/NHS~|~US 250 mainline bridge replacements~|~10 - Bridge Replacement~|~F2B55D517F96EDE9248296DE428C7C75A1A1B35D 125044~|~1~|~2~|~02/BRO~|~Plan split for SR 259 bridge over US 250~|~10 - Bridge Replacement~|~401C30E1AE05D87D4CA2A8468B84EC39B07AC0D7 104935~|~1~|~1~|~01/NFA~|~The Village will construct a 340 foot extension of Millcreek Blvd east of Green Red and widen 160 feet of Harvard Blvd, east of Green Rd.~|~01 - New Construction~|~C1D8B42925F1055B5E76745E8746CD3E1BBF6EF4 107747~|~1~|~1~|~01/STR~|~Covers all work to rehab bridges~|~13 - Bridge Rehabilitation~|~220CBC26CEE27CBE7979F1D9B075F53521A7FB95 115759~|~1~|~1~|~01/NFP~|~Split for slope repair work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~576F915C9483149E57D2DD76C6F18235503B9857 90936~|~1~|~1~|~01/SAE~|~SRTS Project (sidewalk & Multi use Path) in Creston~|~28 - Facilities for Pedestrians & Bicycles~|~0B9154E630C8800A54105E80E00373D40EC02F92 104687~|~1~|~1~|~01/NFA~|~SCI CR 253 0.00-0.95 Widening.~|~21 - Safety~|~B31E6014725F2235E9BCA4225124C395FD1B1920 95690~|~1~|~1~|~01/CMQ~|~Hull Prairie from SR-65 to Roachton~|~05 - 4R Maintenance - Resurfacing~|~442B30689B9700E1F6D2F6294C1776EDD1145FF9 94286~|~1~|~1~|~01/NFP~|~Replace existing bridge deck on SFN 5537029 Farver Road Bridge #0.15 (Eldean Covered Bridge).~|~32 - Historic Preservation~|~179069C76DCAB5E5F4B143C95EDDA6AF2FC89341 87300~|~1~|~1~|~01/STR~|~Resurfacing a portion of US 68 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~E2F5A47EF39EF643F34675195691EDF4D5F6CA69 87300~|~1~|~3~|~03/NFP~|~Plan Split for resurfacing work on SR 251. This is a Non-Federal Aid route.~|~05 - 4R Maintenance - Resurfacing~|~B5FAB5BC40D2F25ADF9D79BF5B626A4E4B45B5A8 87300~|~1~|~2~|~02/S<2~|~Plan Split for work resurfacing on US 68 from SLM 12.21-12.27. This small section is classified as Urban since it is close to Wilmington~|~05 - 4R Maintenance - Resurfacing~|~1B6DD14E03DF0E8C4E9EFE39B414295868446A9C 87300~|~1~|~4~|~04/STR~|~Bridge overlay, expansion joint and bearing replacement for structure CLI-68-0711, SFN 1400967, CLI-68-2.67 replace guardrail.Replace superstructure CLI-68-0321, SFN 1400843.~|~13 - Bridge Rehabilitation~|~11E7DF59FDD54B246FDD10A4A2EA27914CAAEE4D 87300~|~1~|~6~|~06/SAF~|~Upgrade guardrail SFN 1400924 CLI-68-450~|~21 - Safety~|~665B26FD972B5B9F28AE0FDDA4BCB385977F4198 87300~|~1~|~5~|~05/STR~|~Replace small culvert CLI-68-0592.~|~44 - Other~|~9F8F4C6A2278149F0A92C49076697E68945BC6FB 122901~|~1~|~1~|~01/IMS~|~Plan split 1 is for the overall truck parking site reconstruction work, not including the rest area facility which will be designed by Central Office Facilities.~|~21 - Safety~|~43A3F71F9C693160F54F6B8A02BFE26D6F398769 84568~|~1~|~2~|~02/S>2~|~100% City of Alliance items...related to partial and full depth repairs, and sidewalks and curb ramps...in the City of Alliance, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~4D3D1D1839EF1B1A72670DF2BCF2BF129B988572 84568~|~1~|~1~|~01/S>2~|~Resurfacing of US62 from SLM 36.47 to SLM 37.86 and SLM 38.60 to SLM 38.99. Resurfacing of State Route 183 from SLM 17.33 to SLM 17.66 in the City of Alliance, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~8723ED9501860A7C82AC59B041FF8CC565BBA96E 113542~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~B5A9A49A248C2723ABF046640E6EC924A496A604 91931~|~1~|~2~|~02/STR~|~Plan split to include costs associated with the drainage improvement north of the northbound corporation limit outside the Village of West Elkton, which is located at the approximatel location of where Pine Street once intersected SR 503.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A301794D94D6EE098FDAE68F259919366D5AEA7 91931~|~1~|~4~|~04/STR~|~This plan split is to capture costs associated with bridges greater than 20 feet (federal definition of a bridge). Includes bridges PRE-503-0678, PRE-503-0697, PRE-503-1056 (>20' when measured along a skew), PRE-503-1101, and PRE-503-1170.~|~04 - Reconstruction - No Added Capacity~|~58B0EA55B2C09BB7531D866C5DEA920CA967DF4D 91931~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on a portion of SR 503 in Preble County from the Butler County line to just south of West Alexandria.~|~05 - 4R Maintenance - Resurfacing~|~65B5F7874E1FAE1F045ED882B92AEF31BFDCCBE7 91931~|~1~|~5~|~05/STR~|~Plan split for bridges between that are between 10' and 20' (meet state definition of a bridge, but not federal definition) including guardrail upgrades at that location. These include bridges PRE-503-0018, PRE-503-0924, and PRE-503-1075.~|~13 - Bridge Rehabilitation~|~69C82232C510C19944F5E2773B5C3A88327C558E 91931~|~1~|~6~|~06/STR~|~Plan split for work asociated rehabilitationg for replacing small culverts (spans less than 10') including small culverts PRE-503-0346 and PRE-503-0436.~|~04 - Reconstruction - No Added Capacity~|~7DB9E95CE9CA47C13F4BA71733A617D714077F2A 91931~|~1~|~3~|~03/STR~|~Plan split to capture the drainage within West Elkton from the 1.50 to the village corporation limit at 1.57, which is the appxorimate location of where Pine Street and SR 503 used to meet.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E68D9FAFBF61BAAE78328658559EC59856AE5964 120712~|~1~|~1~|~01/ENH~|~Mercerville Multi-Use Path: Sidewalks and Lighting for Mercerville Road, SR 218 and Station Street connecting to Hannan Trace Elementary School.~|~28 - Facilities for Pedestrians & Bicycles~|~F8BC04591301F9619C36BD90C12FFB9E8BA1F890 113767~|~1~|~1~|~01/SAE~|~Remove and replace Type A anchor assemblies located on State and Local NHS routes.~|~21 - Safety~|~714A20FCC8161D24A25EC5E8D94C0C35D3A4DE3D 125574~|~1~|~1~|~01/BRO~|~Encase piles with structural repairs~|~13 - Bridge Rehabilitation~|~AC0B17BBD7A919E8EB049DA8A79732B70E662E00 121063~|~1~|~1~|~01/S>2~|~Pedestrian improvements along with associated work along SR750 within the City of Powell ~|~28 - Facilities for Pedestrians & Bicycles~|~5C68E3712E16574F9C6357E9CAD831B1D72234F7 81641~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 5 from 0.00 to 6.45, in Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~B87DEAA8A9B0BA28E943BC8C880AAF36AC548120 81641~|~1~|~2~|~02/NHS~|~See linked structures greater than 20' span.~|~13 - Bridge Rehabilitation~|~108AE9FF7502AF260767AAC7D893E6627008997C 81641~|~1~|~3~|~03/NHS~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~1F265434582CDFBFB350D9E0361279062364E20A 81633~|~1~|~2~|~02/NHS~|~Plan Split to cover pavement markings.~|~~|~96301AEFE11F2B7EF27008587A6773CA32828F84 81633~|~1~|~1~|~01/NHS~|~Resurfacing SR18 0.00-4.90~|~~|~D14C08FC977F50802B1541B2414053903C233843 22597~|~1~|~1~|~01/BRO~|~Elmore bridge~|~~|~7D63A21EC46F3811F0A7F40B24E91C3770A16CD8 87075~|~1~|~1~|~01/CMQ~|~CMAQ funding for all work on this project~|~28 - Facilities for Pedestrians & Bicycles~|~67D85FE9256C6108A0E0685672AA53CC523B80D9 87075~|~1~|~2~|~02/NFP~|~100% local participation pay items~|~28 - Facilities for Pedestrians & Bicycles~|~400FD622072978E2722BF964D412C2E3A2FA6300 92872~|~1~|~1~|~01/S<2~|~DEL-36-9.03 headwall/pipe, in Delaware urban area, STP<200,000~|~05 - 4R Maintenance - Resurfacing~|~16DDF28890EF38DA12FA5528B325C20B19463E18 92872~|~1~|~2~|~02/STR~|~DEL-521-5.99 replace culvert - rural area~|~05 - 4R Maintenance - Resurfacing~|~48AD0D001AB941EAFB96F63B795AB50B553302EC 107678~|~1~|~1~|~01/STR~|~Resurfacing on US 224, SR 114 and SR 637 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~5EE5277B82ADC851B40128BDD6AD1BA3B6F3209D 107371~|~1~|~1~|~01/NFP~|~Plan Split~|~44 - Other~|~64A905215A5AE6FB9F6588D15CF2D6FEFF8F000E 88886~|~1~|~2~|~02/STR~|~Bridge Work (< 20') - SFN 8503427 - District Allocation~|~10 - Bridge Replacement~|~552F83577D8804A1F1F9E83828B6D8517179FC69 88886~|~1~|~1~|~01/STR~|~Bridge Work - SFN 8503397 - District Allocation~|~10 - Bridge Replacement~|~EE4A707461F50E8F24408DFB8C0013919F05E3BC 92977~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on Lic-US 62-10.57 to 20.64~|~05 - 4R Maintenance - Resurfacing~|~97153462B455723A11DC3331B18FE40C1DE74ABC 92977~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Lic-US 62-10.57 to 20.64~|~05 - 4R Maintenance - Resurfacing~|~D8D69F49BC0807A161034EB579EB26A16276479B 93131~|~1~|~1~|~01/ERD~|~City of Alliance; Additional sidewalks. ADA ramps. Pavement markings. Signing for school crosswalks.~|~28 - Facilities for Pedestrians & Bicycles~|~181748BC94FDE33362572BE111FA519C29020D36 118792~|~1~|~1~|~01/NHS~|~Fine Graded Polymer Modified AC Overlay (Smoothseal) WAY-30-9.18 to 11.62~|~05 - 4R Maintenance - Resurfacing~|~AE9787209BFB13AA6A4F9629FFC8F34CAD53C65A 118792~|~1~|~2~|~02/NHS~|~Bridge Maintenance work to be included with smoothseal project WAY-30-9.18 to 11.62~|~47 - Bridge Preventive Maintenance~|~6DF387626EFAF84F79885004B99EF1A7A88D2C11 124714~|~1~|~1~|~01/SAF~|~construction of a roundabout~|~21 - Safety~|~B423AECFF2B201E6582EB3CB0FA3879B6E95CC92 114667~|~1~|~1~|~01/STR~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~E8DCFAF5E0122105B3545CE4455F958F05C1E392 114667~|~2~|~2~|~02/NHS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~AA5BB6CEA42FDA06B1DFE8EE8A586AEB672B026E 114667~|~1~|~3~|~03/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~E5CA49BA27529B3F7E58677E4FE3628CD1A5F0A2 119960~|~1~|~1~|~01/NFA~|~Mill Street Bridge superstructure and substructure full replacement. Remain on existing alignment. Minimum approach work.~|~10 - Bridge Replacement~|~E0AD465D34AA3ECEBF4DA8614C958459887DB3AA 88420~|~1~|~2~|~02/NHS~|~Pave culvert invert. WAS 260 0.48 (SFN 8403856) and WAS 550 21.29 (SFN 8404704). Purchase Order.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54E9DF47146A0E4FD137E115A6AB27CF7AF6CAB2 88420~|~1~|~1~|~01/NHS~|~Pave culvert invert. WAS 7 11.58 (SFN 8400180). NHS route funded 80 federal/20 state. Purchase Order.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B3AEE646223D98E662E2D380FBA2CFB051F60A86 121007~|~1~|~1~|~01/STR~|~Plan split for federally eligible DBT costs in both design & construction.~|~10 - Bridge Replacement~|~B44E6AF0B5C2800D462A6CF0E2C2783E086A6EC9 97775~|~1~|~1~|~01/NFP~|~Construct new Roberts Road Outpost~|~01 - New Construction~|~424CD38E068E5F00A9A0D0AF47D5FDD5243AC63C 113855~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~3EE386CD14397A6717CB3E834BC0D48B4A9658C1 98749~|~1~|~1~|~01/BRF~|~SFN 8745625~|~10 - Bridge Replacement~|~439F711C3DD2B42DCC26A2EC16C8FA561670EC27 80993~|~1~|~1~|~01/MPO~|~Pavement widening 80/20 NOACA/Village plus $95,000 capped District Allocation contribution~|~04 - Reconstruction - No Added Capacity~|~5B29254A34A06F501783ADDF668589381C18F50A 80993~|~3~|~3~|~03/S<2~|~For work being performed outside of Village limits. This is being funded by MPO and District Preservation.~|~05 - 4R Maintenance - Resurfacing~|~7255C8D650BC1CF5141102AC1EF4A24B4E40A48D 80993~|~2~|~2~|~02/S<2/LCEO~|~100% Local Items~|~04 - Reconstruction - No Added Capacity~|~7F5CAC79FAFA407BE8916E399DEB1CD6C2CB63F8 119240~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing the routes within the STP Rural Area~|~05 - 4R Maintenance - Resurfacing~|~7682EE268978E393B840ED58531D9C4512EE1161 119240~|~1~|~2~|~02/S5K~|~All items of work associated with the resurfacing of the routes within the STP 5,000 to 49,999 Area.~|~05 - 4R Maintenance - Resurfacing~|~2079F5F10BF69EB1B8C9FDCEAAF465015D7896F0 95262~|~1~|~1~|~01/SAF~|~Relocation of Harper Street and E Canal Street (US 33) intersection in the City of Nelsonville. Funded 80 federal/20 local.~|~21 - Safety~|~EC9A5273EF7182480275E8E5EEC375502B5BF1AB 93707~|~1~|~1~|~01/S>2~|~80/20 split between federal and local to resurface Auburn Road using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~DA0B487D26D76CD609FF316CCA221A416DCF8717 85681~|~1~|~1~|~01/STR~|~Replace guardrail on CR205, 0.00 - 10.38.14.38 lane miles of federal aid route100% Fed, CEAO safety funds.01/STR/OT/Ross~|~21 - Safety~|~B34725A7539D41076FD74594D99F9A989C7BA657 89129~|~1~|~1~|~01/BRF~|~Remove deck, replace superstructure with prestressed concrete beams with a composite deck. Rehabilitate and widen the piers supported on spread footings with deep foundations, replace existing abutments with new integral abutments, and associated work required to rejoin the structure with the existing approach roadways, on Heathcliff Road over the Stillwater River in Butler Township. SFN 5730082 MOT CR 228 0.00~|~13 - Bridge Rehabilitation~|~8CCE7D16E983EFCAC795981B4EF62AECC790CC7F 10788~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all eligible bridge work~|~13 - Bridge Rehabilitation~|~10E4AD1A6824BD080FE6EFE6FB55C1730A5127C6 99582~|~1~|~1~|~01/STR~|~Resurface SR-120.~|~05 - 4R Maintenance - Resurfacing~|~C9901D3E9472580A2CC2DC8812A10787BCE4AAC8 99582~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~FACE7FF54AB2B499CCEA4C91E2D70E51CA551C8C 104999~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " -Plan Split 1~|~47 - Bridge Preventive Maintenance~|~3CF3D6095344AB2E378221B49BE13ED531C23CD1 109155~|~1~|~1~|~01/IMS~|~Placing asphalt concrete wearing surface on IR 77 mainline bridges in the Dover-New Philadelphia area.~|~47 - Bridge Preventive Maintenance~|~BCC4B0AEE998DF6FA0850F508A90E3C3B44CD2B3 109155~|~2~|~2~|~02/NHS~|~Place asphalt concrete wearing surface on Structure TUS-250-1890.~|~47 - Bridge Preventive Maintenance~|~894A5CAE621818D789F0B50AC41C822D1FF929B6 93532~|~1~|~1~|~01/SAE~|~Part 1: Extend existing path from Intermediate School south to existing path by water tower on east side of Upper Bellbrook Road to connect to school sidewalk; Extend path (current SRTS Infra. Proj.) from Middle School drive to Eden Meadows Way on south side of Feedwire Road.~|~21 - Safety~|~C649D34FBDB58F724FC5FF085AB1C94962D6E134 93532~|~2~|~2~|~02/SAE~|~Part 2: Construct a shared use path along Upper Bellbrook Road from Feedwire to Kable's Mill Drive (See PID 96356 for Design and RW funding).~|~21 - Safety~|~ADC12A9E3CDD865F4608286E038ABD87F3FEE421 120688~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~E0E423DF10185BACC56C3A8D7998E58F9E55C221 107649~|~1~|~1~|~01/CMQ/STCE~|~Replace signalized intersection with a roundabout.~|~21 - Safety~|~1D5E270F8EAB965DC8CFD929383F4FAA8A751456 107649~|~1~|~2~|~02/S>2/NCAN~|~Waterline relocation, 100% City of North Canton cost.~|~43 - Utilities~|~1A2B0BD0376CA985CB9B7E9A63A940386DDC762F 112256~|~1~|~1~|~01/NFP~|~FRA Freeway Lighting maintenance contract~|~44 - Other~|~60822089584745CAD4B6C03B736965860F7E7BD1 112256~|~1~|~2~|~02/NHS~|~Just a place holder. Project classification and Plan Split detail might change. Amount taken from D06 ELEC FY20 so conversion from going from D6 to FRA may impact.~|~21 - Safety~|~99F66C7A6C6AF4A2D410035415DB7C421EE703C9 114797~|~1~|~2~|~02/S>2~|~Water work items being added at 100% local cost~|~21 - Safety~|~4021FBBB5B53D5A7DC2C773467AD9D0C65022186 114797~|~1~|~1~|~01/SAF~|~Safety items for roundabout~|~21 - Safety~|~C5E8D9AA5381F91707E45E587B51B0E025815A63 113665~|~1~|~1~|~01/MPO/BEAV~|~Widening of the Factory Road bridge over Little Beaver Creek to provide three lanes and accommodate pedestrians and bicyclists.~|~21 - Safety~|~BFE2F493EC7F651ADBC7B13D9E641BC7CA29BF6E 113476~|~1~|~1~|~01/IMS~|~Type B emergency, design-build project, to stabilize hillside along ramp from Colerain-Beekman Ave. to westbound I-74. Roadway and pavement repairs will be completed once hillside is stabilized.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8E65EBD4EA83D335D2FB319C344B92C5F8267BEF 121557~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~70608EDE87B2272382FADD4EAD8E564817450A5D 100884~|~1~|~1~|~01/STR~|~HIG 41 0.40 (SFN 3600459)~|~10 - Bridge Replacement~|~A57F5C3DA47D7FFB4825861CDF0F0C7DC5218779 113326~|~1~|~1~|~01/NFP~|~The CIC will improve the intersection of Enon Rd and Speedway Dr by extending the southbound left turn lane 185 feet as well as installing all underground traffic signal infrastructure to support the D7 project 112642.~|~44 - Other~|~D921A7CCDAC9A53CC70EA3858630D7F756D822A8 96902~|~1~|~1~|~01/NFA/SCI~|~It is proposed to replace/rebuild guardrail at various locations on the local county roads in Scioto County. 100% Fed.~|~21 - Safety~|~60E1B00DEFE751247BA9667D6DCA8A962951DCA7 99609~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during project scoping.~|~13 - Bridge Rehabilitation~|~78C1956E817A33C0652A5BD856D5BB4EAC79FAE8 123674~|~1~|~1~|~01/NHS~|~Superstructure Replacement.~|~13 - Bridge Rehabilitation~|~2F12875617B6BC63B4732D02DCEB1DCCF489383A 127049~|~1~|~1~|~01/SAF~|~federal safety funded items~|~28 - Facilities for Pedestrians & Bicycles~|~898CF04AB1F0127E3B3ACBF1221ED93E8A93F7F8 121423~|~1~|~1~|~01/S>2~|~Plan split to replace the existing bridge including widening the existing shoulders to 8 feet. If bridge is to be widened for a turn lane or additional capacity, a separate funding event and plan split will be needed. ~|~10 - Bridge Replacement~|~4437512095D9D3939CA316CF87A00A34A9600E44 120942~|~1~|~1~|~01/STR/MWCD~|~Resurfacing of all roads within the Idlewood Cottage Area~|~05 - 4R Maintenance - Resurfacing~|~FF14149198504AFC9CD8E32CB40BE9D218E8C2A2 105120~|~1~|~3~|~03/STR~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A80404042E284F7C55A536B8E8AA50FE88A51D38 105120~|~1~|~2~|~02/S<2~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3C926273D8633CB20CDB5AEEA4F6B292586BBEEC 105120~|~1~|~1~|~01/S>2~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~789E04F6BBCC8ED732998651D213384968D8F7E3 105120~|~1~|~4~|~04/S>2/MACE~|~Resurfacing, urban paving in the city of Macedonia.~|~05 - 4R Maintenance - Resurfacing~|~5D7DE7FD1C0A9358B9ACB4E1D3D2DC134681ACBA 114730~|~1~|~1~|~01/STR~|~Overlay on JAC 279.~|~05 - 4R Maintenance - Resurfacing~|~A88C8B0245004B5D885F61F7DE7B13ECEC3E507D 114730~|~1~|~2~|~02/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~BA4059B7131149E41E4AF613706F8DC24C476F48 98742~|~1~|~1~|~01/IMS~|~REhabilitating two bridges (TUS-77-0378L SFN 7902018 and TUS-77-0378R SFN 7902042) by replacing superstructure and two other bridges (TUS-77-0388L SFN 7902077 and TUS-77-0388R SFN 7902107) by replacing deck.~|~13 - Bridge Rehabilitation~|~FD76118129756356E452D2F32ED4E4D04A3F0070 98742~|~1~|~2~|~02/BRO~|~Rehabilitate bridge TUS 258 0306 (SFN 7905521) by removing and replacing deck edges and providing new asphalt overlay.~|~13 - Bridge Rehabilitation~|~4D11A6FD2F8CB99AA131FFFBC4094CB0798E8701 105715~|~1~|~1~|~01/MPO~|~Work eligible for federal-aid funding~|~05 - 4R Maintenance - Resurfacing~|~3B57190AF9488D3EAE87F7AFA06D44EC18CD6B59 94539~|~1~|~1~|~01/S>2~|~80% federal / 20% state funding split using Geologic Site Management funds~|~44 - Other~|~705559027C04F3C7F832936EE95D58C7C2899DD5 89264~|~1~|~1~|~01/BRO~|~4861108 LUC 01W79 NO DATAIntersect: NORFOLK SOUTHERN~|~13 - Bridge Rehabilitation~|~17B5EDADBCA2E2A7AAD80C4B9CB5381948F00A2B 121257~|~1~|~1~|~01/NFP~|~added HS plan split.~|~44 - Other~|~A8C51A76B2C24E294C7656EE03561B0886DD4930 88945~|~1~|~1~|~01/NHS~|~Remove and replace existing bridge (TUS-250-1233F, SFN 7904770). with new steel beam bridge.~|~13 - Bridge Rehabilitation~|~8406AEB010C78CECC82C3C242FB165EB1327EE5C 116409~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~653DC5EFC9FE7E5E7F50A46DAFDD76AA4D9884B6 121088~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 800 over Stillwater Creek.~|~10 - Bridge Replacement~|~97F1E3868801C0145A36609BD49BC4999BB6B4D5 126014~|~1~|~1~|~01/NHS~|~Establishing Funding Event~|~~|~328525F526C7847F54FF5183988BD2A3B07342D5 109491~|~1~|~3~|~03/S50~|~Trenching & pipe for sewer work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B91AB834062FE0A1B915FB0FEA50FC7F8B7205B 109491~|~1~|~1~|~01/S>2~|~Reconstruct the roadway~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~58C6304030BD58D5BA58DC6791C186B5D40784F3 109491~|~1~|~2~|~02/ENH~|~TA funding for concrete sidewalk and curb ramps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7394B79909F6874784D385F5E44C3EE5C8BF47B9 91577~|~1~|~1~|~01/STR~|~JAC SR124, SFN 4002377, 23.05 Intersect Rich Run80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~2DB1CDDAA561998B073A7F29C7433405153F171A 88804~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~E359C85383E0778ED7BC803A48D0D8CB69C579A6 88804~|~1~|~2~|~02/STR~|~Bridge Work: CRA-103-17.75~|~13 - Bridge Rehabilitation~|~7C2255CBA742D210467955004D333173BC0D01F2 111710~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD.~|~~|~F4B0A3D5F4E6292ABEB0FA30813FD52CF81D57EB 96069~|~1~|~1~|~01/STR~|~"01/STR/OT/ " for construction of a 200 ton Salt stroage building at the Old Washington Outpost~|~44 - Other~|~3E059F13106C5CFE6C9DFB97EA4D2E7FE31A5DAB 119817~|~1~|~1~|~01/SAF~|~Pedestrian safety project. Includes sidewalk, curb extensions, curb ramps and pavement markings. ATH 329 13.64/ATH 550 10.78.~|~21 - Safety~|~EDD30EBB89103B9FB72E471C067B4275482462A8 84651~|~1~|~1~|~01/NHS~|~LAW US52 15.00 - 18.00~|~05 - 4R Maintenance - Resurfacing~|~BA000B5D7F29DED3644BF70F5C50CF61A5477453 117274~|~1~|~1~|~01/SAF~|~Safety eligible ~|~21 - Safety~|~4C9411D5BFB636ABAD20AE21D1D4AE1F72FDE448 117274~|~1~|~2~|~02/NHS~|~Local Items~|~21 - Safety~|~6A3EAC9FA93B9CE2E1469B339A21CF16D0BCA76C 90788~|~1~|~1~|~01/MPO~|~Construction of bike lanes including widening of sidewalks, installation of trees, street lighting and all appropriate street marking and signs on East Fifth Street from Wayne Avenue to Hamilton Avenue and Hamilton Avenue from East Fifth Street to Steve Whalen Boulevard.~|~28 - Facilities for Pedestrians & Bicycles~|~89E0ED2543CFE6BC6EA0F56691A4030C0F59F087 107588~|~1~|~1~|~01/NHS~|~PIK 32 16.08-19.92~|~~|~18A974A244148A062A92A7171BB6FEB0308C7A39 116298~|~1~|~1~|~01/NHS~|~Chip seal in ADA.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FAE56601B32EEFE2674AAF29677C4BB958A3BACC 109683~|~1~|~1~|~01/STR~|~Resurfacing COL-62 from SLM 5.44 to 10.02~|~05 - 4R Maintenance - Resurfacing~|~7317299ACFF9F082F2C37792AB02237E06AE9F19 109683~|~1~|~2~|~02/S<2~|~Resurfacing COL-62 from SLM 10.02 to 10.83~|~05 - 4R Maintenance - Resurfacing~|~D8A86F42D7600F6BBFA12B75CCBFBF7E60D1413A 100952~|~1~|~2~|~02/S>2~|~MAH SR 446 from 0.00 to 1.51.~|~05 - 4R Maintenance - Resurfacing~|~FD3A5C68605EEA45896DD079A81A4B0425ED36E1 100952~|~1~|~1~|~01/STR~|~MAH US 224 from 2.88 to 7.60 and 7.60 to 11.24.~|~05 - 4R Maintenance - Resurfacing~|~6038F111C95042DFC7FCB3BBD44D1D1C872147B8 121458~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~AA470DAAF8A0BEC9AD695BCDE1CB9F532B38F480 97597~|~1~|~1~|~01/STR~|~Herbicidal spray at various locations throughout the District.~|~44 - Other~|~85B64A4661525EA7CD19B2D4048E3B41C6EFF6B0 112457~|~1~|~1~|~01/S<2~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~85E99178752F1697840337AF0C9F16BC8B0006E7 112457~|~1~|~2~|~02/STR~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~09F924E4591CFCA9EDAA9EB9BF75CD0811AE7AB9 93623~|~1~|~1~|~01/NHS~|~Improve 2 to 4 lane transitions. MEG US 33 3.09-3.23 and 14.15-14.27.~|~21 - Safety~|~A7634C62ED2AE2379F3D77657A2E2882757C9F64 100592~|~1~|~1~|~01/STR~|~Crack sealing of various routes in District 11.~|~99 - State Preventative Maintenance~|~FBD0DC7AB5CBA6C025BDBB07F97AD4051504FFD3 107656~|~1~|~1~|~01/STR~|~Resurfacing on SR 67 from SR 117 at SLM 1.59 to the Kenton Urban Area boundary at SLM 13.29. District preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~047E535DC2DB19115A14C038A2F8AEFCCB027A73 107656~|~1~|~2~|~02/S<2~|~Resurfacing on SR 67 from the Kenton Urban Area boundary at SLM 13.29 to the corporation limits of the City of Kenton at SLM 15.07. Although inside the Kenton Urban Area this work is outside of the City of Kenton. District preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~A0FF623347A388060314389D7D1B443061F8DDF2 110094~|~1~|~1~|~01/STR~|~UNI 739 from 14.74 to 22.68 and 22.93 to 25.81 and UNI 37 from 1.95 to 2.2 (which overlaps UNI 739)~|~05 - 4R Maintenance - Resurfacing~|~02B35E340E9C03AA8197E3D8CEACF2F93DAEF360 89007~|~1~|~1~|~01/IMS~|~90/10 District Allocation~|~44 - Other~|~1ACB336876A27D97E4A0440DC46954946B5EC9D0 107766~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4.~|~~|~EE1CE007FD1289FC60F622E005F2404C498034D9 88700~|~1~|~1~|~01/STR~|~Pave the rural route: SHE SR 705 SLM 4.48 to 12.33~|~05 - 4R Maintenance - Resurfacing~|~BC5C9AEF306C243D6C9CA61A030427DCAE5998CD 88700~|~1~|~2~|~02/S<2~|~Pave the small urban route:SHE SR 705 SLM 4.26 to 4.48~|~05 - 4R Maintenance - Resurfacing~|~93D692FDA8B4D0AC93C8F30B88365D59100E5B27 115132~|~1~|~2~|~02/S5K~|~Pavement Chip Seal ASD SR 511 10.961 TO 11.179~|~05 - 4R Maintenance - Resurfacing~|~5EA831BC069118A70289BB8EC464CD447D18D461 115132~|~1~|~1~|~01/STR~|~Pavement Chip Seal ASD SR 89 5.400 TO 14.544 ASD SR 89 0.000 TO 4.682 ASD SR 430 0.000 TO 0.602 ASD SR 511 6.970 TO 10.961 RIC SR 430 10.110 TO 12.509~|~05 - 4R Maintenance - Resurfacing~|~313E18CA007FB5ADEBB7D71856231CF4F27DC343 100837~|~1~|~1~|~01/NHS~|~Culvert work on NHS route.~|~13 - Bridge Rehabilitation~|~35B97804A60BA4907E04C628D233BF236E402897 100837~|~1~|~2~|~02/STR~|~Culvert repair on rural routes.~|~13 - Bridge Rehabilitation~|~78BC1E63958948B84C73F9A386424C82B51290E7 103254~|~1~|~1~|~01/STR~|~Overlay on rural routes.~|~05 - 4R Maintenance - Resurfacing~|~6E3E34A79F1DAE0A071CA5B406C2CF726293F937 95447~|~1~|~2~|~02/NHS~|~District Preservation Paving ? 4PF7 (80% Federal) / 4PS7 (20% State) ? Resurfacing with related work on NHS routes; 1) Mus-SR 93-00.00 to 00.25; 2) Mus-SR 93-03.45 to 04.72; 3) Per-SR 93-20.52 to 27.10~|~05 - 4R Maintenance - Resurfacing~|~0B0CC6FC42A33C24AB84871747D89EF7B95B4010 95447~|~1~|~1~|~01/STR~|~District Preservation Paving ? 4PF7 (80% Federal) / 4PS7 (20% State) ? Resurfacing with related work on OFAH-Rural routes; 1) Per-SR 93-17.89 to 20.52; 2) Mus-SR 93-00.25 to 03.45.~|~05 - 4R Maintenance - Resurfacing~|~95F773A546CA6D89213FB7B53CD83F09F42F00D6 103675~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 11.79. DSR MEG-004.~|~~|~7EC619F0ACE274E70CB5061429EE20B59AA8E61D 91313~|~1~|~1~|~01/IMS~|~Priority system paving of MAD-70: 0-8.62~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~48DF7D2C4DC1F61E969BE118DD3A01C30DACBC5A 81541~|~1~|~1~|~01/S<2~|~SCI SR140 4.94 to 5.25 SafetyOn SR140, begin project 4.94 miles north east from US52 and head north east for 0.31 miles. It is proposed to correct the horizontal and vertical alignnment of the curve on this section of highway.80/20 split 01/S<2/PV/State~|~21 - Safety~|~083A3531F06E40A5C245E2B75806C435829C8985 81541~|~1~|~2~|~02/S<2~|~7304269 SCI SR140 5.04 Intersect: StreamBrdg ReplacementSCI SR140 4.94 Safety4.94 miles NE from US52 80/20 split02/S<2/BR/State~|~21 - Safety~|~E256FAB75632F3BCED4F33A36956884D039974B3 121023~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~79814FBA47A88AEE493FE397CFF30DE98FBCB65D 92804~|~1~|~1~|~01/STR~|~STP funding for new bridge on UNI-245 due to floodingNo SFN yet~|~08 - Bridge - New Construction~|~366C8B26A9A2B59AED509EA3B7B732E13F73F7BE 110475~|~1~|~1~|~01/SAE~|~Project to improve the safety and operation of the intersection of US 35 and SR 121~|~21 - Safety~|~AAABC1EC125931DD8BE8E5838FD6157A948C7AA9 100333~|~1~|~1~|~01/STR~|~This is a placeholder Plan Split entered for the funding can be entered. More than one split will be needed. Actual splits will be entered later.~|~05 - 4R Maintenance - Resurfacing~|~29A6573EB104446BC96C134BD06EF952D8171441 117524~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 231 1.62 SFN 0545430. Funded 95% State/5% Local.~|~10 - Bridge Replacement~|~56B8F3F70FBC49D6A3B795F21BCFFF3117C374EC 98752~|~1~|~1~|~01/S<2~|~Culvert replacement/retaining wall on MOE 536 1.24/1.37. Urban other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~07103092DF615C9A0D6AA730DC23845703F46626 121726~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay without Repairs HUR -61-20.559 to 23.764 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~9F5F091D0628F13B344DAD88C24EAE317638A798 121726~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay without Repairs HUR-61-23.764 to 23.910~|~05 - 4R Maintenance - Resurfacing~|~0C04DBE3FBC6C021E28853D4602B970ED3CE8989 123728~|~1~|~1~|~01/NHS~|~nhs bridge~|~13 - Bridge Rehabilitation~|~4E080E266B0F9CEB87549878EA2AB43E7015F4DD 123728~|~1~|~2~|~02/NHS~|~Jackson NHS plan split.~|~17 - Construction Engineering~|~20BE5807E8EB656DD8397CCD962C69DF7337F407 91764~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an asphalt overlay treatment. VIN SR 32 0.00-7.67. NHS federal aid route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~EB3500D21488ED894777B0370665FBE37298AA18 94632~|~1~|~1~|~01/SAF~|~Access management, lighting and pedestrian improvments between Gerlaugh and Dillie roads.~|~21 - Safety~|~C26095EF9602A8FBC626823CAE15D7CE0F6CCFD8 94632~|~1~|~2~|~02/S<2~|~An extension of 8" water main along Dalton Drive acorss State Route 235 to connect to an existing 12" water main~|~17 - Construction Engineering~|~F4CE8300A8A1BD1D0D985A1B664F9F93D2DE8C2C 112782~|~1~|~1~|~01/ERD~|~Split for Earmark ID OH-442 funded eligible resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~1BD094FFA32B38D14B122CB8E06E64FDE7D1D4B5 101935~|~1~|~1~|~01/ENH~|~Stormwater improvements.~|~37 - Mitigation of Water Pollution Due to Highway Runoff~|~3D9FFA255E75D931DC29AAB8C4D48C4EA05563DE 115954~|~1~|~1~|~01/S>2~|~Plan split for federally eligible items in construction.~|~05 - 4R Maintenance - Resurfacing~|~6348AC9E96D6A4EA305031176BFF9F1A7AD4EB29 115954~|~2~|~2~|~02/S>2~|~Plan Split for 100% Locally funded work items.~|~17 - Construction Engineering~|~C585C15116AC3CC6EBF521E7685A862E17A57FAB 114359~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~34FD63BA9F22FFAD0CB7FB8E0A57FBA00B377049 121732~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~AA44E562421CF11AE27A207872DB1EDA26368F67 90759~|~1~|~1~|~01/IMS~|~90/10 funding split using federal Noise Wall Replacement funding.~|~44 - Other~|~44E2631C179CC86818CD8781059FBA816CF6258A 90759~|~1~|~2~|~02/IMS~|~Split for 100% local work~|~44 - Other~|~D7F827A300509775E7C515A9D8ECDDEC3F3EB584 87093~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 28 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. Limits are from SLM 0-3.01 and from SLM 10.38 to 18.17.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~43C4857C8CBF7B21D4F718DA76617EF29A6A4F74 87093~|~1~|~3~|~03/STR/BLAN~|~This Plan Split is for the utility trench repair along SR 28 in the Village of Blanchester. The Village is applying for an OPWC grant to pay for it.~|~05 - 4R Maintenance - Resurfacing~|~96B991F59B78008B6B8126022206825545F17C8D 87093~|~1~|~2~|~02/STR~|~This plan split to include all costs associated with the following bridges: CLI-28-1475 (SFN 1400606) and CLI-28-1691 (SFN 1400746).~|~13 - Bridge Rehabilitation~|~9843C48693CD7912A71166031A6B02B28335875E 114281~|~1~|~1~|~01/IMS~|~Mowing contract - D8~|~99 - State Preventative Maintenance~|~48E91CA85554B45117D8FE18A2F73C2553C5ADDD 114281~|~1~|~2~|~02/IMS~|~Mowing contract in D7 on: MOT IR 675 SLM 0.00 to 7.44 MOT IR 75 SLM 0.00 to 9.31~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B753235663178285A72B0D48D4AF14AE9DA0E785 91731~|~1~|~1~|~01/IMS~|~Replace deteriorated bridge decks SFN 1206567 CLA-IR-70 3.10 SFN 1206575 CLA-IR 70 3.12~|~13 - Bridge Rehabilitation~|~1C3021702210956ABB3457043E322DC6D7F8F218 94038~|~1~|~1~|~01/NFA~|~Within Shawnee State Forest, It is propsoed to replace the culverts on Roads, 4, 6, & 19. 100% State 01/NFA/OT/State~|~17 - Construction Engineering~|~13990ED5EC9C356C81842F68583A9B91A5564EB1 120670~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work on E. Walnut Avenue and S. State Street, MPO STGB funding.~|~05 - 4R Maintenance - Resurfacing~|~A0787B59663F90778D392E348273C427D4A919A7 111643~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 376 1.10. GSM funded. Rural other federal aid funded 80 Federal/20 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CC3276CF9543165BD567F490F034B13BC8EA7ED6 102457~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 0.00 to US 30, SR 45 from SLM 22.03 to 22.13 and SR 558 pavement from SLM 10.47 to 12.56~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B27293C5B623C373C503BFD599F4ABBA0267C6F8 102457~|~1~|~2~|~02/S<2~|~Resurfacing SR 45 from SLM 22.13 to US 62 and SR 558 from SLM 1.52 to 2.16~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6574C6C803C9EE362B822DEF6B63EA1444A10F47 102457~|~1~|~3~|~03/NFA~|~Resurfacing SR 558 from SLM 0.00 to 1.52 and from SLM 2.16 to 10.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7B481AAAACDAE0F692FDC187DA7226673E495EE 97091~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 4 0824 WT, SFN 8430217 funded by CEAO. Replacement of existing single span truss on existing alignment with incidental roadway approach work. Funded 80 federal/20 local.~|~10 - Bridge Replacement~|~A3E921ADF349DC1540E670F82C66083FE67620BA 119574~|~1~|~1~|~01/SAF~|~Construction of sidewalk and ADA ramps at the intersection of US-42 and West Ave. and Perry Pike.~|~28 - Facilities for Pedestrians & Bicycles~|~620F0BBBDE09268CE498859BB22ED70009BCF45D 125904~|~1~|~1~|~01/IMS~|~establish pro rata percent~|~44 - Other~|~108F4DDDBCD52F3032CFB72929704955B280D144 92369~|~1~|~1~|~01/STR~|~resurface SAN SR 101 4.55-9.66 - Clyde East Corp line to Ohio Turnpike~|~05 - 4R Maintenance - Resurfacing~|~4A0C8B6778A880DCDBF6CEDD360977DD1B7D92EF 92369~|~1~|~2~|~02/S<2~|~From SLM 3.88 to SLM 4.55 Urban Pav~|~05 - 4R Maintenance - Resurfacing~|~A72919D4CA608FBA854486CF0A204A382A0DACF0 88523~|~1~|~1~|~01/STR~|~resurface SEN SR67 0.00-2.32 - Wyandot County Line to SR-100~|~05 - 4R Maintenance - Resurfacing~|~90515E1805B0E473B2F81E3D3EA81AA8807DD34D 88523~|~1~|~2~|~02/S<2~|~@ SLM 0.46 and SLM 1.17~|~13 - Bridge Rehabilitation~|~DEF6D8FEA5570427803CC290CD28119DF47C29C9 108932~|~1~|~1~|~01/MPO~|~Various street resurfacing~|~05 - 4R Maintenance - Resurfacing~|~96E6EA0650EBF8367D55164DAA8EE5235E3BB6B2 101763~|~1~|~1~|~01/STR~|~Plan Spit "01/STR/PV/ " - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~2ADE817E5F527B9EF2B212A4C4525112EBDB8D65 100422~|~1~|~2~|~02/NHS~|~7100930 ROS 23 15.32L (Dry Run Rd)7100965 ROS 23 15.32R (Dry Run Rd)7100906 ROS 23 13.06 (Marietta Rd)~|~47 - Bridge Preventive Maintenance~|~9A661AD3BE5E1A16CB218C2EF9451912163A4954 100422~|~1~|~1~|~01/NHS~|~ROS 23 12.82-16.36ROS 35 20.45-20.56~|~05 - 4R Maintenance - Resurfacing~|~02617E2BEE2B5DBA0F84A569F344DE715977970D 93819~|~1~|~1~|~01/S>2~|~Resurfacing of Howe Avenue between Main Street and Buchholzer Boulevard, in the City of Cuyahoga Falls. Includes pavement repairs, signage, light poles, storm sewers, as needed.~|~05 - 4R Maintenance - Resurfacing~|~87E84118CD3B62E7BF31E4DD58852ED0FD545A8D 93819~|~1~|~2~|~02/S>2~|~Repair of sign support at the end of SUM SR8 ramp and Howe avenue.~|~44 - Other~|~B1296E3435FE9B25A96E399C599C06B38A93C4C8 108115~|~1~|~2~|~02/S<2~|~WAS SR 618 3.22-6.23. Full depth pavement repair and curb ramp work. 80% Federal MPO funds and 20% Local match.~|~05 - 4R Maintenance - Resurfacing~|~935660786AC249E573F958E8406F35A6AC5EE9EC 108115~|~1~|~1~|~01/S<2~|~Asphalt resurfacing project. 80% Federal and 20% Local match. WAS 618 3.219-3.254 WB only, 3.254-3.389. 3.389-3.564 EB only, 3.564-4.500, 4.500-4.559 WB only, 4.559-6.230.~|~05 - 4R Maintenance - Resurfacing~|~02873216A617760671386A9102D12C3220AF813E 108115~|~1~|~3~|~03/S<2~|~Asphalt resurfacing project. Funded 80% Federal/20% State. WAS 618 3.219-3.254 EB only, 3.389-3.564 WB only, 4.500-4.559 EB only.~|~05 - 4R Maintenance - Resurfacing~|~D2A3AC3405E65161650EF8CDA70F0CD431D89391 108115~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~29001D5E1F0170645164201673D25F3766C30C07 107386~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~D07A3293AE8140CB9280C735227F8732904D026E 113388~|~1~|~1~|~01/SAF~|~Guardrail installation project on various routes in Gallia County using HSIP funds. Funded 100% Federal.~|~21 - Safety~|~4B660D8368FA28C6F4A902A29678CF0E92CF2FD8 123264~|~1~|~1~|~01/IMS~|~Construct Noice Wall~|~~|~A1ED0CC09BB648110DD84482EB2ED7AFAFA3156C 109909~|~1~|~1~|~01/NHS~|~Landslide repair, 100% state funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~53C8CAA000BE2D6EA4748AD9CAFFC77548E93175 93859~|~1~|~1~|~01/CMQ~|~Provide an 8 ft. sidepath along the east side of Grange Hall Road from Patterson Road to SR835. Including curb and gutter and new storm sewer along the east side of Grange Hall Road. A bike/pedestrian bridge will also be installed over the Little Beaver Creek to the east of the existing bridge.~|~~|~DDD2C0750758EFE8D6CD94F87A0D7B530B8AE80B 121658~|~1~|~1~|~01/BRO~|~Replace overlay and joints~|~13 - Bridge Rehabilitation~|~378CA287393F6D5A265F0118E02BC102E5E2EE99 88723~|~1~|~1~|~01/STR~|~0103470 ADA SR136 17.33 Intersect: StreamBrdg Replacement 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~E6CA484D801C362B27A1D393C0B128B28DF29303 102227~|~1~|~1~|~01/NHS~|~New Miami St connector.~|~01 - New Construction~|~F3B048CF6E9ABE5F984C46BF08AC22F8B39E0F30 102227~|~1~|~2~|~02/NFP~|~New Part Code for additional lane on Connector Road; To be paid by LPA~|~01 - New Construction~|~B35B589C69B44A4FDCD6576AAE4516867D2DDF8A 107136~|~1~|~1~|~01/BRF~|~Replacement of SFN 6842445 which carries Spring Street over Rocky Fork in New Paris, OH.~|~10 - Bridge Replacement~|~2CEFB252EFF63C3242D08982F00EE0E8BACCE49E 110976~|~1~|~1~|~01/SAF~|~Active railroad warning devices being installed within 200 feet of the traffic signal requires preemption to meet MUTCD and to keep vehicles off the track when a train is approaching.~|~22 - Rail/Highway crossing~|~918D0232CED0C67510F52E1AD89911AD265F29C7 84580~|~1~|~1~|~01/STR~|~Federal Rural STP funds. No eligible for federal bridge funds. All funds from the District Preservation Program. 80% SAC 4PF7 and 20% SAC 4PS7.~|~13 - Bridge Rehabilitation~|~0F7C6FD3F294A16FD49A07FC9162F361C98C2AD5 109779~|~1~|~1~|~01/S<2~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~77B599B637094A872175F1129D905802DC0CB51B 109779~|~1~|~2~|~02/STR~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~782FA7CCE21C5934BF19574CEA9238BD3EA9BB35 98118~|~1~|~1~|~01/NHS/MAR~|~NHS Urban Paving Marion SLM 10.01 to 12.99~|~05 - 4R Maintenance - Resurfacing~|~24FFE63BE9683CD8CE7943A967A9EE1ACA22EC85 88747~|~1~|~1~|~01/SAF~|~Highway Lighting Maintenance Contract for highway lighting in District 7 - 2 years. This plan split is for work to be performed in District 7.~|~21 - Safety~|~50DCF5AD9C77C6DEBF5F3C2BE1805060556F7E9B 88747~|~1~|~2~|~02/SAF~|~Highway Lighting Maintenance Contract for highway lighting in District 8 - 2 years. This split is for work to be performed in District 8.~|~21 - Safety~|~6FB8485E7396CA530A0399AFFCC050B005BD570B 107958~|~1~|~2~|~02/NHS~|~Plan split for work on US-23 ~|~05 - 4R Maintenance - Resurfacing~|~890A4C917136CE595340817344E53F045E994E26 107958~|~1~|~1~|~01/IMS~|~Plan split for work on IR-475 and I-475/US-23 Ramps~|~05 - 4R Maintenance - Resurfacing~|~A5CFE88FB401F7AE9F221F3F9078EE3CCB26A13C 110553~|~1~|~1~|~01/IMS~|~Bridge Repair.~|~13 - Bridge Rehabilitation~|~AEB542CC7D4461B967E7D743074299943E87558D 102451~|~1~|~1~|~01/NFP~|~Split for painting the structural steel of all structures~|~47 - Bridge Preventive Maintenance~|~5A6BFDE7460D3F6AA5B58DF20190987BD005D06D 100672~|~1~|~1~|~01/STR~|~Chip sealing HAS-9 from SR 151 to CAR Co. Line and HAS-519 from US 22 to New Athens.~|~05 - 4R Maintenance - Resurfacing~|~AF877ACB2A4D8E20449D0D955D2FAD3FA0CF5C44 96659~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 78 30.64-36.83. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~939FCA95C422C8506B7115799006D089A35508A1 106133~|~1~|~1~|~01/NFA~|~Landslide repair, NOB 513 7.00. Not on any federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C2AB56F87422E85A24BF0087FDA6258B7BEC9E36 98576~|~1~|~1~|~01/SAF~|~This plan split contains all work required to construct the project. This includes work along Feedwire from Adam?s Place to Eden Meadows Way. This section of path will also include the installation of a crosswalk at Adam?s Place and on Feedwire Road at the Roger Scott/Eden Meadows Way intersection.~|~21 - Safety~|~4F837FA72A863BF1C52D44BD43133610B6CD0D54 104194~|~1~|~1~|~01/MPO~|~Plans Split for project~|~28 - Facilities for Pedestrians & Bicycles~|~1B5552D9F71DCD041EC0AC21EDF91A12F78ED0F4 82968~|~1~|~1~|~01/S>2~|~District Wide Crack Sealing project on the Priority System for FY2015. Routes to be determined. (Approx. 100 lane miles). This Plansplit is for non-interstate Urban routes in the Cincinnati area~|~99 - State Preventative Maintenance~|~95913214F519671DC99D2E878E836B248BD9D0BF 96315~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: WAY-241-0.00-2.72, 2.86-7.13~|~05 - 4R Maintenance - Resurfacing~|~8B2FE2E4E7C657351E99662A6C66589515DF2E0E 96315~|~1~|~2~|~02/STR~|~STP Rural Bridge Work~|~13 - Bridge Rehabilitation~|~E48A42CA6F2CC540141240F6E5A203AB714CE0C9 118432~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~~|~3621B97EA6233D118051F592754E8F0CA6E87D3C 101266~|~1~|~1~|~01/NHS/LOUI~|~Resurfacing STA SR 153 from 6.26 to 7.47, urban paving in the City of Louisville.~|~~|~09237D0D2636F5FC771F9FB532F4109F76624CE5 96479~|~1~|~1~|~01/SAF~|~Raised Pavement Marking project for FY2019. Various routes and sections in D10. Non federal aid project funded 100% state.~|~21 - Safety~|~3279FB0A405DDB0FF6D5CD0677D0B767B655C3B7 109503~|~1~|~1~|~01/CMQ~|~Construction of a parking lot near the Wellsburg Bridge at Brilliant, Ohio.~|~20 - Environmental Only~|~B4143B91D98DBF7B539F88ABF0A7D06580D59962 87251~|~1~|~1~|~01/STR~|~ADA SR41 0.00 - 7.46 Resurfacing ProjectBegin project at the Brown County line (SLM 0.00) to SR136 (SLM 7.46). It is proposed to resurface the highway with asphalt concrete.Pave thru brdgs:0100609 ADA SR41 0.48 Intersect: Sunnyvale Run0100633 ADA SR41 0.96 Intersect: Buttermilk Run0100722 ADA SR41 1.91 Intersect: Streambox Run0100757 ADA SR41 2.73 Intersect: Bradysville Run0100781 ADA SR41 3.22 Intersect: Blackpride Run0100838 ADA SR41 3.61 Intersect: Cranston Creek0100846 ADA SR41 4.29 Intersect: Richley Run0100870 ADA SR41 5.2 Intersect: Mussel Run0100900 ADA SR41 5.88 Intersect: Wounded Run80/20 split01/STR/PV State~|~05 - 4R Maintenance - Resurfacing~|~0FCD12C26029B17C397677A761E5C3B6667EBE95 87251~|~1~|~2~|~02/STR~|~ADA SR41 0.00 - 7.46 Resurfacing ProjectBrown County line to SR136. Brdg for Rehab:0100641 ADA SR41 1.02 Intersect: Big Three Mile Creek80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~1595A374956CCB7BAE97DF9FA2F23860BA3729E3 90984~|~1~|~1~|~01/SAF~|~Various traffic control items & Dublin Granville bikepath from Morgan to Fordor~|~21 - Safety~|~14EE25FEE53C7E1422479DB91DE7FDEF85324BD7 104995~|~1~|~1~|~01/NFP~|~D5 pavement marking (fast dry) plan in western D5 counties~|~21 - Safety~|~0DEF7F5EFBD950E553F1263A6073602F2124CE62 124699~|~1~|~1~|~01/BRO~|~Bridge replacement.~|~10 - Bridge Replacement~|~67522D92FDA10F53D2E954C287DD2CFBCB82E42F 76420~|~1~|~2~|~02/S>2~|~Federal/local (Columbus) urban pavingFRA-315C (Goodale St) SLM 0.00-1.0902/S>2/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~179A12F21F04F16110950B5551EEB97E9AE1D110 76420~|~1~|~4~|~04/S>2~|~100% City items in urban paving section~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F6AE6A939D8A82396AC1E5463CE91B1E0CB82295 76420~|~1~|~5~|~05/IMS~|~Work on structures FRA-315C-0.48 and FRA-315C-0.53L. Eligible for 90/10 Interstate funding~|~47 - Bridge Preventive Maintenance~|~089DA4C1F22E72DDA2E0514AAF4A9AAC038BDDF9 76420~|~1~|~3~|~03/NHS~|~Minor work (patching, sealing) on 6 bridges - federal/state funding~|~47 - Bridge Preventive Maintenance~|~CBA2EC0D57C2BD84CAD6649715A58791141870FF 76420~|~1~|~1~|~01/NHS~|~Federal/state prority system minor rehabFRA-315: 0.00-2.3701/NHS/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E6500729F80C0BF75D715906C27EBC4BF8A18190 101553~|~1~|~2~|~02/S<2~|~Preventive Maintenance Chip Seal: SLM 3.82 to 3.86~|~05 - 4R Maintenance - Resurfacing~|~215D1167431FA3030661026E3BC7B2FFD4DBF6E4 101553~|~1~|~1~|~01/STR~|~Preventive Maintenance Chip Seal: SLM 3.86 to 13.93~|~05 - 4R Maintenance - Resurfacing~|~D07539962B7F1BD267F2BDFF5B3015CEEC351AC7 98045~|~1~|~2~|~02/S<2/DEL~|~STP < 200 80/20 Delaware UPUrban = 4.92 lane miles (33.7% x 20% = 6.7%)4.5-5.25.35-6.276.45-7.29~|~05 - 4R Maintenance - Resurfacing~|~8CDA3C13F734AAFB31FB8E22349820BEA39631AD 98045~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.00-4.50~|~05 - 4R Maintenance - Resurfacing~|~8EDCE260BA5BC49DBA98809EA6989D9148005D1D 121481~|~1~|~1~|~01/NHS~|~All items of work associated with FRA-104 resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FF9194E1AA87F4E4FC1E547A7154C5803BD06544 100364~|~1~|~2~|~02/STR~|~Overlay SR 41 with asphalt concrete CLA SR 41 SLM 24.90- 27.57~|~05 - 4R Maintenance - Resurfacing~|~2B0E868A1AE5C596255ED53B4CC0A88F35D33622 100364~|~1~|~1~|~01/S>2~|~Overlay SR 41 with asphalt concrete CLA SR 41 SLM 22.14 - 24.63 CLA SR 41 SLM 24.63 - 24.90~|~05 - 4R Maintenance - Resurfacing~|~C778526703B1E7DFF0CDFE3534694BDC9D6AD2C7 100364~|~1~|~3~|~03/S<2~|~Overlay on SR 235 SLM 1.51 to 3.95 on STP <200000~|~05 - 4R Maintenance - Resurfacing~|~5B0B1B155F92E87F82787246E157FC76E01262B0 88352~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for use with federal BHF funds. 4301358~|~13 - Bridge Rehabilitation~|~C01C12E8A6BA081A5B9B59A967324691693AFC60 88352~|~1~|~2~|~02/NFP~|~100% local participation by AT&T for work on their facilities on the structure.~|~13 - Bridge Rehabilitation~|~A17D9EA17FB98CFA36B8F5D3F17405A800028528 104794~|~1~|~1~|~01/NFP~|~Mowing on various routes~|~31 - Landscaping & Other Scenic Beautification~|~F481B7BDD329F27DE4B23F96835D24BDE0FF8FDC 102823~|~1~|~1~|~01/NHS~|~Resurfacing on NHS system.~|~05 - 4R Maintenance - Resurfacing~|~4CA2C5F22216044BECFF798800E8210551A23F44 102823~|~1~|~2~|~02/S>2~|~Resurfacing on STP urbanized area.~|~05 - 4R Maintenance - Resurfacing~|~B6095DBFD6043B252D7128C7AF7A8690D7D0E942 102823~|~1~|~3~|~03/IMS~|~Resurfacing on interstate system~|~05 - 4R Maintenance - Resurfacing~|~BF0FC49F457BC131BE9E982B9EEC069A82D9AB6B 125689~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance~|~21 - Safety~|~F3D43E9EA738DBD0126B30FD1B443002B1DA2736 125977~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~64DC16FBA21BDD7E22F2ED4D849AD24A6BA548F9 95437~|~1~|~2~|~02/IMS~|~For various bridges.~|~13 - Bridge Rehabilitation~|~29F126A798C621582AF1864DEAD551E91203C39A 95437~|~1~|~1~|~01/IMS~|~HAN-75 from SLM 18.30 to 25.23 WOO-75 from SLM 0.00 to 3.01~|~03 - Reconstruction - Added Capacity~|~FE911B425E1A3825EF71083F62DB750619B81ABA 86959~|~1~|~2~|~02/NHS/NIL2~|~100% City items on TRU SR 46 3.18 to 3.44 and 4.74 to 5.61.~|~05 - 4R Maintenance - Resurfacing~|~13544F5716D149AA44B1A9FF4583667F7A3CA9BE 86959~|~1~|~3~|~03/S>2/NIL1~|~80/20 Resurfacing costs for TRU SR 169 4.06 to 4.30 and 4.58 to 4.69.~|~05 - 4R Maintenance - Resurfacing~|~28627BBAFFCB866E315673532C45E4EF7401B5A1 86959~|~1~|~4~|~04/S>2/NIL2~|~100% City items on TRU SR 169 4.06 to 4.30 and 4.58 to 4.69.~|~05 - 4R Maintenance - Resurfacing~|~8C6A2318D1F38FBD55FCAF9250CC56D57D8A9640 86959~|~1~|~1~|~01/NHS/NIL1~|~80/20 Resurfacing costs for TRU SR 46 3.18 to 3.44 and 4.74 to 5.61~|~05 - 4R Maintenance - Resurfacing~|~AE4B1FC147B967C9B97CEF1BC07DC26959CADEAD 89297~|~1~|~1~|~01/S<2/LCEO~|~"01/S<2/OT/LCEO - County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP = $387,500.00 Total Federal dollars ($310,000.00 4B87 plus $77,500.00 Credit Bridge to make it 100% Federal up to the CAP) - Replacement of 4561708 LIC CR134 01.54 Intersect: ditch; Would be BR Eligible for Replacement: Length=23 SD/FO(1) SR=40.8 DSR=3 but being replaced by an 18' culvert~|~10 - Bridge Replacement~|~E58151DC7F8B0DF9CC48B18CBAA71AF6078159F9 102876~|~1~|~1~|~01/IMS~|~Plan Split 01 created for IR routes~|~05 - 4R Maintenance - Resurfacing~|~6DE54F2CDF07EE6CAA6ED6E21A2887595B4699FE 102876~|~1~|~2~|~02/NHS~|~Plan Split 02 created for IR routes~|~05 - 4R Maintenance - Resurfacing~|~41EC3A6D80D578DE7B01BA9796B8C16400A83BAB 102876~|~1~|~3~|~03/S>2~|~Plan Split 03 created for STP > 200000 routes~|~05 - 4R Maintenance - Resurfacing~|~D8E5CFF7A4B9C92DBB6F58320D061684E4111E90 102876~|~1~|~4~|~04/STR~|~Plan Split 04 created for STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~BC318E5DF05B5F695BFC9B07F2B62769B2971EF9 120309~|~1~|~1~|~01/NHS~|~added plan split.~|~10 - Bridge Replacement~|~C3D63D4F880EAF0056E3B2E718E1CE42AFE859E2 109313~|~1~|~1~|~01/SAF~|~Safety Plan Split~|~21 - Safety~|~7ACDCA29BCA1661A10B7B1F03BFD4104C8EF0496 120018~|~1~|~1~|~01/SAF~|~Plan split for roundabout~|~21 - Safety~|~B326175E72CB03D44BD3113ECFFE51BF774BFCF0 120018~|~1~|~2~|~02/NHS~|~Plan split for resurfacing of SR-420 from SLM 0.81 to 2.385~|~05 - 4R Maintenance - Resurfacing~|~D0401CDF6C7F0B424278A36AAE2A20343F6E677B 111854~|~1~|~1~|~01/BRO~|~KYTC's share of the overlay project.~|~13 - Bridge Rehabilitation~|~AAF38E5E39847E3A44D8CBC33CD4FB2EF9366439 111854~|~1~|~2~|~02/BRO~|~OH's Share of the overlay project~|~13 - Bridge Rehabilitation~|~53DF13014A107719D56FF0EC3E210078869D358E 121489~|~1~|~1~|~01/BRF~|~MAD CR 70 0.38 Rehab over Deer Creek~|~13 - Bridge Rehabilitation~|~C98BC0CCACDEEA0CF591DAD88C9B2F085794FE4C 108290~|~1~|~1~|~01/STR~|~Emergency repair project. ROS-001ROS 772 10.30~|~04 - Reconstruction - No Added Capacity~|~9F4A9CD02967D29DE74870575D48A473EECEDC2F 93271~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rereplacement of 1602225 COS SR206 0.6 Intersect: Tributary Of Mohawk Creek; Not BR Eligible for Replacment: Length=30 SD/FO(0) SR=68.2 DSR=" "~|~10 - Bridge Replacement~|~30D74DFC170B7F48979E06DDE5AC3AA35FFC1BC2 117391~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~9670769B68FD47FC294D62FB2DD576A99430C14A 85006~|~1~|~1~|~01/MPO~|~Block fund event~|~~|~AFA19B08C75905EB2E5B84954CBF9497696CC529 89276~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~89E95AC89754F859AD2EF0D5CF696E6D2478BB0B 89276~|~1~|~2~|~02/NFP~|~100% local participation work items~|~05 - 4R Maintenance - Resurfacing~|~3A90B7181959F85EBBD90F58F149D2A726338457 127173~|~1~|~1~|~01/S5K~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc.WAS SR 60/Davis AvenueWAS SR 339/CR 102~|~21 - Safety~|~A1F83EE9D7D100EBFDCC91D2715D268CE7206271 110196~|~1~|~1~|~01/MPO~|~Resurfacing of Shuffel Street (CR-230) between Frank Avenue and Shuffel Avenue.~|~05 - 4R Maintenance - Resurfacing~|~6C435B740526769FDC3475A6FC0733362B1AE985 96694~|~1~|~1~|~01/NHS~|~Plan split to include work to replace the bridge size culvert and other roadway and associated work necessary to complete the project.~|~~|~AA0FB0B7301A6D3C3D25E7094DC2C1DBF83802D7 114380~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 93 12.16 (SFN 8201000) and VIN 324 3.21 (SFN 8202036).~|~04 - Reconstruction - No Added Capacity~|~DBC25FB09C63F8BE85403CD8634C089BD954F10F 121978~|~1~|~1~|~01/SAF~|~Plan Split for Safety funds~|~21 - Safety~|~5CCC2DDF5E14FFB44458CE82EFCCF37840E0D0FE 108350~|~1~|~1~|~01/NHS~|~Bridge painting project. GAL 35 5.47 L (SFN 2700859) and R (SFN 2700867). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~57B442D469AE045380D951059105A5A5A3900369 108350~|~1~|~2~|~02/STR~|~Bridge painting project. VIN 124 2.26 (SFN 8201277) and VIN 160 8.49 (SFN 8201404). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~E4BF58DE2ABEA72D73B2DD3A7BABD3640C1B8743 126361~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~60DC0B4EC3E00F23BA1061E1E8F7C2418BE34DE2 101978~|~1~|~1~|~01/STR~|~Rural STP funds from CEAO. 80% federal SAC 4B77 with a 20% local match from Wyandot County SAC LNTP. All the work on CR 55, CR 134 and CR 142. The work on CR 119 from the Marion County line to the Upper Sandusky Urban Area boundary at 5.65. The work on CR 330 from SR 293 to the Upper Sandusky Urban Area boundary at CR 110 at 11.10.~|~05 - 4R Maintenance - Resurfacing~|~62EAD26AE2C7AAA2581960BF2E80F6DE525DA896 101978~|~1~|~2~|~02/S<2~|~Urban STP funds from CEAO. 80% federal SAC 4B77 with a 20% local match from Wyandot County SAC LNTP. The work on CR 119 from the Upper Sandusky Urban Area boundary at 5.65 to SR 67. The work on CR 330 from the Upper Sandusky Urban Area boundary at CR 110 at 11.10 to the corporation limits of the City of Upper Sandusky at 11.64.~|~05 - 4R Maintenance - Resurfacing~|~04DB9FA65C6E429AFC15BB56342DAB1E62D45496 114148~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges~|~17 - Construction Engineering~|~49B3DF6BEE5FF8197709EFC7B4A688946B578345 120160~|~1~|~1~|~01/S5K~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~C0751E85F120B2F41D700D499C683FC2A84C5DD5 116941~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9DAD2C1DBDA0A8D5C0EC948D4C0F06638EEAB87B 87719~|~1~|~1~|~01/NHS~|~NHS Smooth Seal: MED-18-2.61-2.69~|~05 - 4R Maintenance - Resurfacing~|~A344A30A95E0A45A8DEFCEF6069D233EF77CB140 87719~|~1~|~2~|~02/S>2~|~STP > 200000 Smooth Seal: LOR-252-2.77-5.55~|~05 - 4R Maintenance - Resurfacing~|~2F4159727E331B434C150991F44FF3EE239ACE80 87719~|~1~|~3~|~03/STR~|~STP Rural Smooth Seal: LOR-252-0.00-2.77 / MED-18D-0.00-0.08 / MED-83-2.60-4.26 / MED-83-12.85-15.05~|~05 - 4R Maintenance - Resurfacing~|~238B6CF0574DA8AE392F9A6928FB8129F5A7C17A 101560~|~1~|~1~|~01/NHS~|~Repairs on three bridges~|~13 - Bridge Rehabilitation~|~EF212FE25625EE82D0F71287A536257D7CAE42A9 101560~|~1~|~2~|~02/NHS~|~Deck replacement and repairs on two structures~|~13 - Bridge Rehabilitation~|~5AC2A68D5FBCFD59D3E23461E72EDF6180A622C3 75467~|~1~|~2~|~02/CMQ~|~This split is for CMAQ eligibile pedestrain facilities. The CMAQ eligibility was approved March 28, 2011.~|~~|~0723A7FC330192DC73A725FA890DB4B7A0516F22 75467~|~1~|~1~|~01/SAF~|~This split is for safety impovements. It is the majority of the project. The split does not cover the pedestrain facilities.~|~~|~EDEBD964E31CA402B64F369217B927F1E611BAEE 85271~|~1~|~1~|~01/NHS~|~resurface WOO US 6 0.00-5.04; US-6 from County Line to SR-235~|~05 - 4R Maintenance - Resurfacing~|~9A803952ED2156F1C57DB33156DEF0F0B1AF61B4 85271~|~1~|~3~|~03/NHS~|~Culverts on WOO-6 @ SLM 2.93, @ SLM 3.04, @ 3.09, @ 3.86, @ 4.43~|~05 - 4R Maintenance - Resurfacing~|~A97D8104CEFD7A7CFE1FFB8F30D24EB5F212325F 85271~|~1~|~2~|~02/NHS~|~Bridge on WOO-6 @ SLM 1.35~|~13 - Bridge Rehabilitation~|~D046F734DB2B20C40EAC4C60F78EBC2E9E81D568 122751~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope including resurfacing and sidewalk work~|~05 - 4R Maintenance - Resurfacing~|~1620337D57007ECF45B1318F118C38986E3959CE 122751~|~1~|~2~|~02/SAF~|~Safety funded scope to construct raised crosswalks and related drainage improvements to accommodate the raised crosswalks.~|~21 - Safety~|~80056D6ADF9113FB5C07AD3E7B53232367393EDA 95996~|~1~|~1~|~01/BRO~|~SFN 8600279 Structural steel painting~|~47 - Bridge Preventive Maintenance~|~4BFA24F78233963572B8BA8BEE01C4E727E05AE1 98116~|~1~|~1~|~01/NHS/COLS~|~HNS Urban Paving Columbus SLM 12.36 to 15.99~|~05 - 4R Maintenance - Resurfacing~|~0CC4B5B3E998D1A9E996023541829DC1EBCC28A8 98116~|~1~|~2~|~02/S>2/BEX~|~STP>200 Urban Paving Bexley SLM 15.99 to 16.84~|~05 - 4R Maintenance - Resurfacing~|~57C6813DD5B440A255EE815B15D430CBA77B955A 98116~|~1~|~3~|~03/NHS~|~NHS Urban Paving Bexley SLM 16.84 to 17.57~|~05 - 4R Maintenance - Resurfacing~|~C705A77D5FEC844BED6DBEC51D87DF15E00F4802 117945~|~1~|~1~|~01/NFP~|~Fence installation and repair along various routes throughout District Four.~|~21 - Safety~|~8D18A698A293CCA323DB01AACDCB6829EE53607A 98510~|~1~|~1~|~01/NHS~|~Plan split for all work associated with the rehabitliation of bridge GRE-68-0960 and GRE-68-1340.~|~13 - Bridge Rehabilitation~|~32401D965407E0C9AE78755637BE6297AEA04D51 109343~|~1~|~1~|~01/NFP~|~ODNR project for culvert work in Shawnee State Forest.~|~04 - Reconstruction - No Added Capacity~|~D5A21170A197441C5CED2351A942F769B3625F0D 99593~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work funded at 90% federal/20% state~|~05 - 4R Maintenance - Resurfacing~|~7A3B11B249E6A72DDA2905E2FB2AEDBCCA5D0585 85532~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all paving work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~B29EB642E9E3A7EC15E6F579684E5C6139A57879 89235~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~EDA6B8B3BAB68470936376A99D4B33997EDF191E 89235~|~1~|~2~|~02/S>2~|~100% local work such as curb ramps, etc. in Grand River Village.~|~05 - 4R Maintenance - Resurfacing~|~F9C1853AD4984B5D5DB898F7B138D6345EB38864 89235~|~1~|~3~|~03/S>2~|~100% local work such as curb ramps, etc. in the City of Painesville.~|~05 - 4R Maintenance - Resurfacing~|~77AA428329C4D2C2600DDBCB2DC9E8688306E868 115423~|~1~|~1~|~01/STR~|~Bridge replacement apart of the OBPP.~|~10 - Bridge Replacement~|~D2B55BF1BC39624FCD1BA51CC001B8214CC692C3 92393~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4202678 KNO SR95 10.96 Intersect: Trib Of E Br Kokosing Riv; BR Eligible for Rehabilitation: Length=60 SD/FO(1) SR=56.0 DSR=5~|~13 - Bridge Rehabilitation~|~6391E599DA619EE8037B8E6B32D1AABDFAC40851 92393~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4203216 KNO SR541 2.74 Intersect: Tributary Of Harrod Run; Not BR Eligible for Replacement: Length=35 SD/FO(1) SR=70.9 DSR=8~|~13 - Bridge Rehabilitation~|~6721FFD570CC4B18C9E0378C78232D199382D3B0 86693~|~1~|~1~|~01/STR~|~Chip Seal~|~44 - Other~|~125C24B3FFB02DE0B4070E5DCFF6DFDC682F7199 120845~|~1~|~1~|~01/BRF/GCEO~|~Guernsey County CEAO Federal/State Exchange Program Funding - 4C87 (80% State) / LNTP (20% Local Match) - Replacement of SFN 3030547 carrying over Leatherwood Creek~|~10 - Bridge Replacement~|~18654E468D414A189F880CC65B5439381B2410B3 84605~|~1~|~1~|~01/STR~|~Bridge (length < 20') Construction/Repair (structure type is culvert)~|~10 - Bridge Replacement~|~7CF1DF764733716324027BE4021FE8ECEF274947 104028~|~1~|~1~|~01/ENH~|~Construction of a grade separated pedestrian crossing under Richland Avenue in the City of Athens. Funded 80 federal/15 credit bridge/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~1663D7D158B3D8B192CB78DEC69BE6E5A79BC580 119334~|~1~|~1~|~01/NHS~|~Place holder plan split until locations are added.~|~99 - State Preventative Maintenance~|~76AEA37EB1F03BF2E81557490AA143ED1F327146 110379~|~1~|~1~|~01/SAF~|~Reconfigure intersection of E Main St at S Hamilton Rd~|~21 - Safety~|~D13B00FCC417A9B68D06701F69FB78792FAF562A 89170~|~2~|~3~|~03/ENH~|~Added Plan Split for the CE of the 100% local item for the gas valve box being adjusted to grade~|~17 - Construction Engineering~|~3D380F0F2A632EF145B60B25F3B8B6828BC8D8C3 89170~|~2~|~2~|~02/ENH~|~Added Plan Split for 100% Local Item (Gas valve box adjusted to grade) in the amount of $2,750.00~|~28 - Facilities for Pedestrians & Bicycles~|~AC5B0D507A104A1DF4EB758C5968460109369E45 89170~|~1~|~1~|~01/MPO~|~Bicycle path~|~28 - Facilities for Pedestrians & Bicycles~|~BC015711BB493FF7BA41D8AB947DE13C4C55A278 106228~|~1~|~1~|~01/S>2~|~In the City of Cincinnati, improve pedestrian amenities on Harrison Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~52C12EAF102B257BD42485F5DEBDD48179C73607 96572~|~1~|~1~|~01/IMS~|~fix accident damage to WOO-75-1294, sfn 8703698~|~13 - Bridge Rehabilitation~|~003628E3CDABF5CE08A6668372B8EF40F662A5AC 83722~|~1~|~1~|~01/NFP~|~Metro Park funding to construct turn lanes on DEL-750/Powell Rd to Dragonfly Day Camp at High Banks Metro ParkLocal Sponsor - FRA County Metroparks~|~44 - Other~|~FD22A3DC0C338763E25475F84A142A0F50C2DB41 100664~|~1~|~1~|~01/SAF~|~"01/SAF/OT/ " - Safety Program - Approved for $840,813 (4HJ7-90% Federal) / (4Bc7-10% State) - Safety project on US 62 and SR 661 to install a traffic signal, turn lanes on US 62, and profile corrections on SR 661.~|~21 - Safety~|~2D4B6926970ED5F5EBDDABEF4FE63294BF3A9178 105709~|~1~|~1~|~01/STR~|~Plan split for paving work~|~05 - 4R Maintenance - Resurfacing~|~C7EBD5FC3AE7C01FAF5F2F271C70464B9251D764 93438~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Darrow Road from Gilchrist Road to Eastwood Avenue, in the City of Akron.~|~~|~10C4CED9A406041D0752168F254696C82CCF1958 123016~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order.~|~21 - Safety~|~E7CE75EF9E6D8BBDCED34BA0605AEA6B9C8560C3 123228~|~1~|~1~|~01/STR~|~100' of landslide repair SR 78-22.90 mm.~|~~|~E45502B48D782FDE7C433081B90E2948AE414E6F 105293~|~2~|~2~|~02/NFA~|~Split for conduit replacement at HOL-515-3.52.~|~04 - Reconstruction - No Added Capacity~|~F902296EFAE5F6678DD482196A642E3DE3334E8E 105293~|~1~|~3~|~03/NFA~|~Bridge maintenance work~|~13 - Bridge Rehabilitation~|~468542EC97D21D33B8A1043C07EF5541D59986DC 105293~|~1~|~1~|~01/NFA~|~Full depth reclamation of HOL-515~|~04 - Reconstruction - No Added Capacity~|~4F75B1FF04D84C075E4F8621E61E7FB5A028E2B8 91868~|~1~|~2~|~02/MPO/RICH~|~Rehab Elm Street Bridge~|~13 - Bridge Rehabilitation~|~82DF6AB86DDD9EDB07D43C118D3F187F3B2096B2 91868~|~1~|~1~|~01/MPO/RICH~|~Replacing Union Street Bridge - Rehab Elm Street Bridge~|~10 - Bridge Replacement~|~F292D33B4BAA98E267855D2190B631471B7DF74C 98514~|~1~|~1~|~01/NHS~|~Upgrade school zone flasher assemblies on SR 725 (West Franklin Street) and install new school zone flasher assemblies on Maple Avenue and Iron Gate Park Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~6E8210D5B32E23B29174DC6A86857ADB46A3C2CC 120127~|~1~|~1~|~01/SAF~|~Construction of new single-lane roundabout at the intersection of US 62/SR 39 and SR 557~|~21 - Safety~|~60DBAFCA6162E40EE6FBBA137ABACF6B53449042 104813~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~A58A06EF5E328C39C7A55C3CD4F751E23969C617 106919~|~1~|~1~|~01/MPO~|~Bike Share Program.~|~~|~962E2AAA4CAFBF3940A18518360CD8106191574C 116561~|~1~|~1~|~01/IMS~|~Place holder Plan split until locations are selected~|~47 - Bridge Preventive Maintenance~|~EABDFB297787DC2AB382CAA0E2B12EBE16FF4105 116561~|~1~|~2~|~02/NHS~|~Plan split for NHS bridge repairs and associated costs.~|~13 - Bridge Rehabilitation~|~FB6F2E46FFA9677F76C7DF1A08C0E03CEC3BB5BD 94386~|~1~|~1~|~01/STR~|~AC Overlay w/Rpr HUR SR 01.28 - 01.41AC Overlay w/o Rpr HUR SR 01.41 - 01.78~|~05 - 4R Maintenance - Resurfacing~|~244D5263D14AF3B78A3E2DCB671A4942BCE11CA0 94386~|~1~|~2~|~02/STR~|~Bridge Work to be Determined~|~13 - Bridge Rehabilitation~|~C089C279AFED87FE8C41CFFCB0B577B19F27FDE9 101365~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 821 14.10, SFN 6105645. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~6AB80125A75C5AFEEDA89B128C9A8A322395656B 106769~|~1~|~1~|~01/SAF~|~Install roadside detection units, signal and pedestrian upgrades and local smart network infrastructure improvements~|~44 - Other~|~562DE44FECCB97907459FE31509F6E2A4D5073B2 93102~|~1~|~2~|~02/IMS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~71AE811C1CB593FADCD6B96BC233A8279B2B66AA 93102~|~1~|~1~|~01/IMS~|~Resurfacing of STA IR 77 from 17.62 to 18.54 and SUM IR 77 from 0.00 to 4.07.~|~05 - 4R Maintenance - Resurfacing~|~22AFA8BAC944DA46547925C3C4DCF9C9CC4C060C 93102~|~1~|~3~|~03/NHS~|~Minor bridge work to the linked structure.~|~13 - Bridge Rehabilitation~|~F6E00DB18D7C5B8B7CFDC12A39C849E7E6EF08AE 105098~|~1~|~1~|~01/NFA~|~BRO 286 3.31 culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~797ABF3DE9E8CA905F82B23BCD6579CABE9433BF 113822~|~1~|~1~|~01/SAF~|~Intersection improvements at STA SR 43 and Market Street, SR 43 and Mt. Pleasant Street.~|~21 - Safety~|~8A467E2520820C7C55CF00BD20288531866F854C 113822~|~1~|~2~|~02/SAF/STCE~|~Construct new signal at the intersection of Market St and Mount Pleasant St.~|~21 - Safety~|~3D913559734D969986B3BA0D06DCBF1C804D8F29 99489~|~1~|~1~|~01/NHS~|~GRE SR 4 1.54 - project is to replace two small culverts under SR 4 - SLM 1.54 with a bridge. Culverts are: Corrugated metal pipe 8' 7" x 5' 11" x 192'. Concrete pipe is 6' diameter.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B7A1477FFBC43151456D7E82BF8A8CBFDB98A43C 99489~|~1~|~2~|~02/SAF~|~For safety work to be performed with this project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A528C99053C8A21AC76B85B391A0234F8971F96 112330~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 33 18.48-18.68. Digout and replace with horizontal drains. 100% State Emergency funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~20E4589EA0B04E21CDE4D15E10C0844E1D9BDC8F 104658~|~1~|~1~|~01/MPO~|~Resurfacing South Ave (CR 151) from Western Reserve Rd to Presidential Dr.~|~05 - 4R Maintenance - Resurfacing~|~8933F996237F512EB83516500D71E4ACE6435308 103842~|~1~|~1~|~01/NFP~|~Resurfacing and other miscellaneous items within Delaware State Park~|~44 - Other~|~F1F7B0E59E2B2961F2DC88C0F86AA396E83F7512 84589~|~1~|~1~|~01/S<2~|~Bridge Painting/Repair: LOR-113-12.36 / LOR-113-12.47~|~44 - Other~|~C9417871C184C894C51AA06C4469C4AAC5D0C8BF 84589~|~1~|~2~|~02/IMS~|~Bridge Painting/Repair: LOR-480-1.15 / LOR-480-2.04~|~44 - Other~|~E3F29C5D7282711F2248BBF1EEEAEC663CD66006 84589~|~1~|~3~|~03/NHS~|~Bridge Repair: LOR-83-10.78 and LOR-2-9.67~|~44 - Other~|~B8B06516BF7D4540E45762F8A2C97374561B551D 115031~|~1~|~1~|~01/SAF~|~Split for ramp clear work.~|~~|~E02F0DCFD3855E0527596F473F5AA5A2015FD910 99569~|~1~|~1~|~01/MPO~|~Resurfacing of Water Street from Third Street to Washington Street, Resurfacing of Third Street from Wood Street to Water Street~|~~|~7DA8F077A08F95E47231456BC42023C89EEAC8D3 116414~|~1~|~4~|~04/SAF~|~Safety funded pedestrian enhancements at the SR 241/SR 687 intersection.~|~21 - Safety~|~38BB5572CE1A6DC2DD95FA65533CDA9E84569087 116414~|~1~|~1~|~01/NHS~|~Signal replacement at Strausser.~|~21 - Safety~|~8B930535F1FA0AEA420BD42055CDC3B1E564EB38 116414~|~1~|~3~|~03/STR~|~Signal cabinet upgrade/replacement at POR SR 14/SR 183.~|~21 - Safety~|~62CB52DA16700B30954B7ADDAF65A15EE98DD953 116414~|~1~|~2~|~02/S>2~|~Signal replacement at MAH SR 7/Buena Vista Ave, span wire sign support replacement on STA SR 172.~|~21 - Safety~|~B2E6CA72693C7BE039D5A6452A32B16647F550D6 126929~|~1~|~1~|~01/NFP~|~Guardrail repair and maintenance throughout the district~|~21 - Safety~|~7E7A1F18DB0A51420B59D13C0BF22C28A01EC61D 116009~|~1~|~1~|~01/NFP~|~Tree Cutting.~|~44 - Other~|~E0B072A2E85C887E1E940F9BD03BF326296E14A5 93610~|~1~|~1~|~01/SAE~|~100% federal funding for Safet Routes to School eligible work items.~|~~|~07EECBFB5E6262E70165FEEF537ECC775621198C 87307~|~1~|~1~|~01/STR~|~generaly system resurfacing of JEF-213-9.70 to 14.81; includes pavement repair and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~DEB87BB7C51A60BAB2A0EE57B817554AC2652C12 78677~|~1~|~1~|~01/STR~|~Relocate a portion of SR 794 from SLM 0.600 to 1.800 (segment length 1.20 total lane miles 2.40) in the proximity of the OANG (Ohio Air National Guard) Springfiel Base~|~07 - 4R Maintenance - Relocation~|~56ED8E8484A48C771CA133346B56185626273A82 120822~|~1~|~1~|~01/IMS~|~Culvert replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~546162FF4DE761D56FFAB678BE7424D4A8CF103A 108201~|~1~|~2~|~02/STR~|~Added 2nd Split for Ful CR 23 - CEAO Minor Collector - Special Fed. Billing Code.~|~05 - 4R Maintenance - Resurfacing~|~00CC55341E59E0A84873E009A98F50890A6EB843 108201~|~1~|~1~|~01/STR~|~Plans Split for Resurfacing CR 22 in Fulton County~|~05 - 4R Maintenance - Resurfacing~|~5D775E50CFB82F30B5EF03851451AA7085A26D33 108201~|~1~|~3~|~03/STR~|~Plan Split for bridge waterproofing to be completed in conjunction with resurfacing~|~47 - Bridge Preventive Maintenance~|~C7CB63F136625264B51E5F1340628762B642A1F6 122842~|~1~|~1~|~01/STR~|~Replace existing bridge~|~10 - Bridge Replacement~|~840550AEACA9C884DB34D35FF34B8BF37CB9129B 116568~|~1~|~1~|~01/STR~|~Plan split for bridge work~|~10 - Bridge Replacement~|~48DFDF5BFA26D30E5FA6846C85C30EA39F8E8046 107689~|~1~|~1~|~01/MPO/RAVE~|~Resurfacing of S Diamond St and Mill Rd in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~1E6A4D3E277F8FCCC45E1F099BCBA3EED7D5C2E9 118800~|~1~|~1~|~01/STR~|~Full depth roadway reconstruction.~|~04 - Reconstruction - No Added Capacity~|~B6C34C55D93F2750117867F6A4DA8232CA7E2ECF 118800~|~1~|~2~|~02/STR~|~Sidewalk work aimed at pedestrian improvements. CMAQ funding split.~|~28 - Facilities for Pedestrians & Bicycles~|~FD2E5A209EAA8B03DDA14AB3C3A98B695546F117 113782~|~1~|~1~|~01/IMS~|~Install wrong way signs that use radar technology on various ramps.~|~21 - Safety~|~7622A50A70044BC47ACB71B6C80C5EA3A71CCE26 113782~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~021DAAA8134FEE1329130ED1DA5DB0757F57188C 92876~|~1~|~2~|~02/S>2~|~Resurfacing on a portion of SR 72 outside the Springfield limit. SR 72 SLM 6.77 to 6.81.~|~05 - 4R Maintenance - Resurfacing~|~9A6EDF6053ABD90DFE4A74CB1B5BAEE51FD81207 92876~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with aspjhalt concrete on CLA SR 72 from 6.77 to 8.32.~|~05 - 4R Maintenance - Resurfacing~|~B90B56A37854452F8FEEC23F20AE9A4F3BE49E5E 92876~|~1~|~3~|~03/S>2~|~This is for extra milling and paving work needed due to a water main repair that was performed during construction.~|~17 - Construction Engineering~|~1DB64B66B680495F22C62A75A6CD40F6EB0C7EFF 83409~|~1~|~2~|~02/IMS~|~Bridge Repairs SR 511 over IR 71 ASD-511-10.60/ASD-071-05.27~|~~|~0726A317BAB8B8FE3988A163DD4366EF88ED7EAE 83409~|~1~|~1~|~01/STR~|~Resurfacing~|~~|~AC569794F3F46D8A0BE2A23F2DF4187E421732A6 93096~|~1~|~1~|~01/NHS~|~Reactive Maintenance to perform pavement repairs along RIC 30.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D0730237556B01C1380D5B6ECEE3816A6C45CE3F 115600~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~7C537FB7240A2BCAC5B0C6DEDF75CADE3870425A 88645~|~1~|~1~|~01/NHS~|~Plan split for resurfacing on US-420~|~17 - Construction Engineering~|~DB3F4F0698004B4176C7CAAD2651D2F9A68B526F 109246~|~1~|~1~|~01/NFA~|~Culvert replacement at HOL-60-2.99.~|~~|~7578566DAA34E31C4681309A68A5B0CF35A24F82 107451~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural routes: DAR SR 185 SLM 0.00 to 4.92 DAR SR 503 SLM 0.00 to 0.80DAR SR 503 SLM 0.80 to 7.70~|~05 - 4R Maintenance - Resurfacing~|~43D26FA86238BF40D98BB470FC270F7DC6EAD158 107451~|~1~|~2~|~02/NFA~|~AC Overlay with repairs on NFA route:DAR SR 503 SLM 7.70 to 9.29~|~05 - 4R Maintenance - Resurfacing~|~FAFAC10AC43D7CA78E4EDEDE016C46A9928C0688 121904~|~1~|~1~|~01/MPO/NFRA~|~Resurfacing.~|~~|~529CE75C9850DF503033C289714016A7EA565C6F 115493~|~1~|~1~|~01/NFP~|~District wide herbicidal spray project.~|~44 - Other~|~F5D8328528F4D890166E9AFA589CD296DBE6D820 119079~|~1~|~1~|~01/NHS~|~Replace bridge deck~|~13 - Bridge Rehabilitation~|~0568610CADE21112F93FB47C55D3F9C27E353A97 105513~|~1~|~1~|~01/NHS~|~US 33 from 12.59 to 24.30 (NHS) pavement resurfacing and repairs~|~05 - 4R Maintenance - Resurfacing~|~DDD614A2C17DE103BA8D37CA3518DBEA1A9E7596 105513~|~1~|~2~|~02/NHS~|~Minor repairs on several bridges~|~04 - Reconstruction - No Added Capacity~|~D07E727D1F7EDCB338A83D2FD0D4DD11D23F8D98 105513~|~1~|~3~|~03/NHS~|~Resurfacing within rest area~|~05 - 4R Maintenance - Resurfacing~|~61147749B1001B6E90A3B852911712DF45D34E77 105513~|~1~|~4~|~04/SAF~|~Installation of RWR pavement markings~|~05 - 4R Maintenance - Resurfacing~|~908B475877527A28B049AF9698E84516549B483B 105513~|~1~|~5~|~05/NHS~|~Minor repairs on UNI-33-22.11 (SFN 8001472)~|~47 - Bridge Preventive Maintenance~|~69871EA71BD2459F72EEB85D81B97C9A5B47912A 107474~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~AD7636F66FEE415FF3EDC9F3C7C310E065D5FD36 110704~|~1~|~1~|~01/STR~|~All items associated with crack sealing on MRW-71~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ED682FEAD23A2ADC9C6D8E8F0A79A093FD376627 108773~|~1~|~1~|~01/NFA~|~"01/NFA/BR/CRNG" - 95% Federal (5MP7) and 5% Local (4BG7) - replacement of bridge (SFN 6461336) carrying Adams Street over tributary of Sunday Creek.~|~~|~4D0E5FBFCE95F79EB0A8020DFAA030C93AA56E09 122079~|~1~|~1~|~01/BRF/HUR~|~Bridge Replacement~|~10 - Bridge Replacement~|~DE8A46F92E7D880E455FF79DF73FAACF208BD4A3 113209~|~1~|~1~|~01/MPO/ALLI~|~Intersection improvement at STA US 62 and Beechwood Ave/Sawburg Ave, in the City of Alliance.~|~04 - Reconstruction - No Added Capacity~|~7422F08CF1F800B5A2B2333870E79BE36497B8ED 113209~|~1~|~2~|~02/SAE/ALLI~|~Signal controllers and timeclocks.~|~21 - Safety~|~868457D5CE190C46B7678C1C1918FB671AC2DDAE 120119~|~1~|~1~|~01/NFA~|~Created for TID involvement~|~44 - Other~|~46291E53667FC7E24CE1D9EA1D7137D593037E84 127144~|~1~|~1~|~01/SAF~|~Plan split for SRTS funded portion of the project.~|~28 - Facilities for Pedestrians & Bicycles~|~A38EF700D94D0A29231A0AFAA9390B27B2A05828 124805~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~14044AABDC86927B261BA08DF1DC824CF7236211 124805~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~144BD700F8EA9F09FD8F820A8D6BCC12409629FB 124805~|~1~|~3~|~03/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~C496F372A7F9506A3F2BF6C93CD4E51E8F6B0102 101379~|~1~|~1~|~01/IMS~|~Bridge rehabilitation > 20' span.~|~13 - Bridge Rehabilitation~|~3A71D02FEF7F9721EA864FFA338861EA83240424 101379~|~1~|~3~|~03/NHS~|~Bridge rehabilitation > 20' span.~|~13 - Bridge Rehabilitation~|~3819800BAA012632FEE05E66CE8E64E762700193 101379~|~1~|~2~|~02/IMS~|~Minor bridge rehab 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~870BB552F26FD9868DE4EFD08D5035773230BCA0 101379~|~1~|~5~|~05/STR~|~Bridge rehabilitation > 20' span.~|~13 - Bridge Rehabilitation~|~A79747B6E3E8752A92C1CB92B1BA61B944F1F8DF 101379~|~1~|~4~|~04/S>2~|~Minor bridge rehab 10' to 20' structure.~|~03 - Reconstruction - Added Capacity~|~085A2CAE8B9E465BC3F898C28E121FBFF6ED6619 101379~|~1~|~6~|~06/STR~|~Minor bridge rehab 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~FAECEC22AD72BB07859253777275CDD418388A0D 107243~|~1~|~1~|~01/S<2~|~Slide Repair on LAW 7 1.62~|~04 - Reconstruction - No Added Capacity~|~F7AC98671AD2962BA9BE34F7207DF1B0F10BA7A2 126204~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~98E1F44C8939EB0DA79646F472EB16A359ECAFA0 107585~|~1~|~1~|~01/NHS~|~Lighting Maintenance project. Replacement of poles, luminaires, wiring, power supply equipment. FY 2022. 80% Federal and 20% State funds.~|~21 - Safety~|~8560A881F0D15B1E44F774CC9C426283E7556B3E 107585~|~1~|~2~|~02/S<2~|~Lighting Maintenance project. Replacement of poles, luminaires, wiring, power supply equipment. FY 2022. Funded 80% Federal/20% State. ~|~21 - Safety~|~60F693ED63E0D17E47DFDE2D0B86DFE5F30CFFA0 100972~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~A8C52A3DBEB2E5937EEF496B52FDC5DD38ED9844 98345~|~1~|~2~|~02/NFA~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Guardrail upgrades for Kno-205-(0.26 to 6.94)~|~21 - Safety~|~544E91BC94E101F8440A3552F7E7BD0E1F7FBB28 98345~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail Upgrade in District 5. Cos-36-(0.00 to 10.05), Cos-541-(15.00 to 16.00)~|~44 - Other~|~82E988956803A6313A90AF77BA0E14C2993D3F89 98345~|~1~|~3~|~03/SAF~|~Safety Program - 4HJ7 (100% Federal) - See CAP Comments - Iinstallation of cable barrier along Mus IR 70 between SLM points 5.13 to 7.13.~|~21 - Safety~|~B47E6D0C114A790DB308B3F7E022A6F0B55E0611 93708~|~1~|~1~|~01/NFA~|~Type B emergency to do pavement repairs on: DEL-257: 8.37-22.62 MAR-257: 0.00-0.65~|~05 - 4R Maintenance - Resurfacing~|~A8E9612293FB1BFD1D661BEE0768CE4D1F269E29 113624~|~1~|~1~|~01/SAF~|~Install pedestrian signals and improve intersections with crosswalk markings and signage.~|~28 - Facilities for Pedestrians & Bicycles~|~AB2C5EB2DB6D8ADA0E34D08F7EFA53C3A3CCAC34 94131~|~1~|~1~|~01/STR~|~Resurfacing of POR SR 700 from 0.00 to 4.54 and 5.82 to 7.89.~|~05 - 4R Maintenance - Resurfacing~|~CFF00A3BD8054DD0FC6FFD88727E083E501EE688 94131~|~1~|~2~|~02/S<2~|~Resurfacing POR SR 305 from 0.00 to 0.48 and POR SR 700 from 5.26 to 5.82.~|~05 - 4R Maintenance - Resurfacing~|~0B8D1E5CB66F090A4453F0877CD5A0E212B7382D 94131~|~1~|~3~|~03/STR~|~See linked structure, >20' span.~|~13 - Bridge Rehabilitation~|~D69707EB795A0285C6D1B2E7C48B2F97456B2780 94131~|~1~|~4~|~04/MPO/Hram~|~Curb ramp reconstruction, installing a retaining wall and catch basin reconstruction.~|~28 - Facilities for Pedestrians & Bicycles~|~93AA92115B4A9EB2AC4E207958FB9D0B0018FEA9 114310~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - 100% State Funded (4PS7) - district wide mowing contract.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~834A0159B9D02CF01191E25D9F15FFC505601C5F 102589~|~1~|~1~|~01/STR~|~DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. All work on US 224 in Hancock County which is from the Putnam County Line to SR 235. Work on US 224 in Putnam County from SLM 23.16 to the Hancock County Line at 29.61. District Preservation Program funds.~|~05 - 4R Maintenance - Resurfacing~|~0EFB6F95F36D363559EAD912FBF7BFC7DA61B675 102589~|~1~|~2~|~02/NHS~|~DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work on US 224 in Putnam County from the CSX RR crossing at 21.40 to 23.16. Work on SR 65 in Allen County on SR 117 from the corporation limits of the City of Lima at 18.20 to the concrete pavement just east of Leonard Avenue at 18.30. Work on US 127 in Van Wert County from the corporation limits of the City of Van Wert at 11.33 to 11.63 on the right side of the road and from 11.33 to 11.43 on the left side of the road. District Preservation Program funds.~|~17 - Construction Engineering~|~57AE366AC92D8E1325A74F991DFC42D0CBA5B80D 102589~|~1~|~3~|~03/NHS/VANW~|~DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work on the NHS in the City of Van Wert. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Van Wert. Work on US 127 in Van Wert County on both sides of the road from the CSX railroad at 9.94 to the corporation limits of the City of Van Wert at 11.33 and on the left side of the road from 11.43 to 11.63.~|~05 - 4R Maintenance - Resurfacing~|~F6E1930DA9C10193BB895802C3E2264AE5EFB089 124382~|~1~|~1~|~01/MPO~|~Plan split for rehabilitation and resurfacing work on Fulton Road with NOACA funding~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D749D129BDC5B7D8B950DF2227114B7EB5581A1E 109862~|~1~|~1~|~01/NHS~|~Sealing concrete bridge decks throughout D11 on NHS Routes.~|~47 - Bridge Preventive Maintenance~|~F9D939337352965DE7344EA75E1D42AD4E2AC022 109862~|~1~|~2~|~02/STR~|~Bridge deck sealing for SR 148 (Non-NHS) in Belmont County.~|~47 - Bridge Preventive Maintenance~|~2770911043DD579B2B2AE6F3A9C0F39F6485EF30 101194~|~1~|~1~|~01/BRO~|~District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~566A1DD6CEEBCC14EF99235CFC5BDA2037C5D51C 125490~|~1~|~1~|~01/MPO~|~funding event for Cincinnati Parks Trail along Sawyer Point~|~28 - Facilities for Pedestrians & Bicycles~|~BBA5D7DD892ADCA26486F5FCD73300CD0478A4AC 95372~|~1~|~1~|~01/STR~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~16AD5BD41EA28D26E75EBE83680D45F73886DB86 93006~|~1~|~3~|~03/IMS~|~District Preservation Culvert Funding - 4PF7 (Federal 90%) / 4PS7 (State 10%) - No CAP - Culvert work associated with interstate rehabilitation.~|~04 - Reconstruction - No Added Capacity~|~803B37EC656F39A3ECE5A7D4DFDE2DAF957B1B48 93006~|~1~|~4~|~04/S<2~|~District Preservation Other Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Upgrade of traffic signal detection, signs, and other roadway appurtenances along SR 60 and SR 60G.~|~21 - Safety~|~BFF0C85698261870C8DFAC5C310B70ECF84338BA 93006~|~1~|~5~|~05/SAF~|~Recessed-Wet Reflective Safety Stripin Initiative - 4HJ7 (100% Federal) - No CAP - Straight Line striping initiative for Interstate and Muliti-Lane roadways~|~21 - Safety~|~BF6124DA9499920A7D11786823378C830761B82D 93006~|~1~|~1~|~01/IMS~|~Major Rehabilitation Funding - 4RA7 (100% State) - See CAP Comment - Pavement Rehabilitation work associated with major reconstruction.~|~04 - Reconstruction - No Added Capacity~|~627487FEEE7ACF91CA173B1DE2120B74D1D4F9DA 93006~|~1~|~2~|~02/IMS~|~Major Rehabilitation Funding - 4RA7 (100% State) - See CAP Comment - Bridge rehabilitation work associated with major reconstruction.~|~13 - Bridge Rehabilitation~|~1AACA3C06569F7114BBE3C331948F5AA8DA7AB74 93006~|~1~|~6~|~06/IMS~|~District Preservation- 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge replacement work associated with major reconstruction.~|~10 - Bridge Replacement~|~6E1CE4EBA747723834E823542DE6825F8F7F074D 93006~|~1~|~7~|~07/SAF~|~TSMO State Safety Funding - 4SN3 (100% State) - See CAP Comment - Plan Split for the cost to retrofit the Smart Arrow Boards on the project.~|~21 - Safety~|~C7B127BA5273FC3811A5EC4A21CC84BF9AFA01D8 93006~|~1~|~8~|~08/SAF~|~Installation of traffic monitoring devices along IR 70.~|~21 - Safety~|~3A6350FF613EBF5B7005246D6CCF704981B60A50 93006~|~1~|~9~|~09/NFA~|~retroactive fuel price adjustment~|~21 - Safety~|~D4746020817FA3FC781CE1489E8178A528B20AC5 127063~|~1~|~1~|~01/SAF~|~Intersection improvements at US22 & Old 3C, and Old 3C & Kings Mills Rd. ~|~21 - Safety~|~5CC6F8B612F4C3D958100A5BC59A0EB0B2BDE7AD 116439~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~025C44B183950635E06E4994DD87E13EC83EE482 85598~|~1~|~1~|~01/STR~|~80/20 fed/state fund split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~F738D03D9837D9A98DC329F3BED88F7B82A9E50E 106168~|~1~|~1~|~01/NFP~|~Work at the Ohio Exposition Center~|~05 - 4R Maintenance - Resurfacing~|~0779D64C25B9C29D037FFFFB9F67A55761CD9A13 95341~|~1~|~1~|~01/STR~|~Culvert ProjectO C 000 Other Federal-Aide Highway Major Collector RURALROS -SR -138 6.290 to 6.300 80/20 split~|~44 - Other~|~D0D935E96F5B40838C7DA35FC5D1B1B14FE50D03 117202~|~1~|~1~|~01/SAF~|~New Sidewalk ~|~28 - Facilities for Pedestrians & Bicycles~|~A6E1BA5268588E66EBD24D2341CCAF8E9E993883 106506~|~1~|~1~|~01/NFA~|~This project will improve the intersection of Avon Belden and Mills Road with installing a roundabout.~|~01 - New Construction~|~08D0C66F9A98417BD81DCEFF1BBD27ED9CC770F4 86659~|~1~|~1~|~01/MPO~|~Widening roadway from 2 to 4 lanes and creating an urban cross section with curb and gutter, sidewalk on both sides of MIA CR 25A from SLM 17.19 to 18.66~|~03 - Reconstruction - Added Capacity~|~238D1FABDD646D61E08ED6577571097055B7E4ED 86659~|~1~|~2~|~02/CMQ~|~Widening roadway from 2 to 4 lanes, create an urban cross section with curb and gutter, sidewalk on both sides on MIA CR 25A from SLM 17.19 to 18.66. CMAQ funding eligible as project will improve transportation systems management and operations that mitigate congestion and improve air quality. CMAQ Eligibility Approved Partial CO Air Quality Exempt~|~03 - Reconstruction - Added Capacity~|~9A085A52FA8FA470157383596F9B2EF56ACC177C 124356~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~3BA1DE9A6A18F70AED9D4B58718EF42BA3CE3F49 82970~|~1~|~2~|~02/NHS~|~Deck sealing for structures GRE-35-0455 (sfn 2900211) and GRE-35-0614 (sfn 2900289).~|~~|~AE683049F1F0359E49EC8FE19778DFCA94C132C0 82970~|~1~|~1~|~01/NHS~|~Resurfacing work on GRE-35 and GRE-42~|~~|~6ED1792D5D5B1F3DA63C0026F813FDB113E25D4C 109664~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~A131FCE1D22688FC173D62387D750CC1C940FBFA 103606~|~1~|~1~|~01/S>2~|~Plan split for culvert lining under US 23 & US 42.~|~17 - Construction Engineering~|~8F8350BAADF92914B80BCC6ED6C3FCB8D43BE860 81727~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on JEF-7-4.76 to 10.83; includes asphalt resurfacing, pavement repairs, guardrail and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~6A4E2F16D90420100C5AF52F14AE378BBBFD4400 105587~|~1~|~1~|~01/NHS~|~Bridge Concrete Overlay.~|~13 - Bridge Rehabilitation~|~144271B21D3EDD19E07D559DF8F7955EF1DD5184 93974~|~1~|~2~|~02/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 554 2.45. 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~23EA978607DFE572E3C432410C0A24FE63B2D6C7 93974~|~1~|~3~|~03/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 554 3.57. 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~39F6CFCA7E334C93E9A263FC65A4C8E3E73C00FD 93974~|~1~|~1~|~01/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 218 13.37. 100% funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4898C4B6548BAE18E2BCF64EC997A83582D2A2FA 93974~|~1~|~7~|~07/STR~|~Purchase order contract for jack and bore culvert replacement. HOC 664 2.04. 100% state funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7AA8841226D91213D31BAC29312D2D72950052F0 93974~|~1~|~5~|~05/STR~|~Purchase order contract for jack and bore culvert replacement. HOC 374 0.40. 100% funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~828354668C63B3F49A61510BFE91E000D47FD413 93974~|~1~|~6~|~06/STR~|~Purchase order contract for jack and bore culvert replacement. HOC 374 0.79. 100% funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A478B331BEBE77905668FE4D9F198EF92B8BF225 93974~|~1~|~4~|~04/STR~|~Purchase order contract for jack and bore culvert replacement. GAL 554 4.23. 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D0A13A4FA8FAD560B40296220C66D2F386AC51BC 114588~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 681 5.51. Work includes drilled shaft wall.~|~~|~ADEEB59B7CD367C53CB63B9E9BF9487E91B15C97 114798~|~1~|~2~|~02/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~CA52D48859CEC5B377FFDD3F66DF520F20572CA1 114798~|~1~|~1~|~01/S5K~|~STP<5-49 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~17EBF35993835B6B281066B199F028DD6A0C8CE7 114798~|~1~|~3~|~03/S>2~|~STP>200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~2E1C34422BE4A367F3DC7F62C0AAD24B32644674 114831~|~1~|~1~|~01/SAF~|~Intersection improvements.~|~21 - Safety~|~791CD7BF1279B52D55C0D3DFC3FA60A7159B7D04 113588~|~1~|~1~|~01/NFP~|~Construct a westbound and eastbound turn lane on US20A halfway between SR109 & CR10 to accommodate a new employee entrance. Improve the intersection of CR10 and US20A to accommodate a new truck entrance off of CR10. Major full depth pavement improvements on sections of CR10 starting at the new truck entrance and heading south approximately 2,000'~|~44 - Other~|~1101BD10642EAA880BE22B51EA504A45B266D9B7 101912~|~1~|~1~|~01/NFA~|~The City is constructing a new road extension named Innovation Campus that will be approximately 4830 feet long from Harrison Road to Mink Road and constructing a road west of Beech Road extending Innovation Way to the west 800 feet.~|~01 - New Construction~|~A89E9027D3A2749F13485B455F579978781DBE90 105553~|~1~|~4~|~04/NHS~|~D3 - Lighting pole replacement~|~21 - Safety~|~769265F78EB4B19C8D625351ABE66A42B954CAB2 105553~|~1~|~5~|~05/S50~|~D3 - Lighting poles replacement~|~21 - Safety~|~E3CB462DCE1827243E4364AE682B29AECE536C02 105553~|~1~|~6~|~06/STR~|~D3 - Lighting pole replacement~|~21 - Safety~|~2D65441261D455A07DCC4F0BE059E325D758D08E 105553~|~1~|~2~|~02/NHS~|~D2 - Lighting pole replacement~|~21 - Safety~|~A7BD5084623C238F4357CE72C34F2404BD2C42C1 105553~|~1~|~3~|~03/STR~|~D2 - Lighting pole replacement~|~21 - Safety~|~A19FEFD3ECE93EF43F39918094DE13CD18B4E4FD 105553~|~1~|~1~|~01/SAF~|~D2 / D3 Electrical upgrades ~|~21 - Safety~|~168BDA78215A1E98DC33C0135BE75D72981AD88B 115387~|~1~|~1~|~01/NHS~|~Converting a weigh station into truck parking.~|~21 - Safety~|~57043398D66C7C1D1E2520B5EDA22D662D13A2FD 93746~|~1~|~1~|~01/ENH~|~test~|~~|~F2AB99B364E759781ED77EED21704076A7B808BC 96859~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various county roads within Huron County.~|~21 - Safety~|~0D97A872424DCE8CB22D4F68F9BBE9C90C8D85F9 116764~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E212418843927D8AC6D90D60CB32B144145520BB 116764~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~ED274F9FE31FFDBD75D1723D327F4EDF82119E3D 116764~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0CD55B7DD5956F68989B461F6E82683BD53DACD0 116764~|~1~|~4~|~04/NHS~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~19F53C1989A8121AE4C62CD67FDD371914F54396 96555~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~~|~323AAE1623DC4CA0A8E0110AEEDE4D33D05AA23B 96555~|~1~|~5~|~05/STR~|~Minor bridge work 10' to 20' span.~|~~|~621CC201F0C393AAAB05C5BE4B3FDB8F935B3240 96555~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span.~|~~|~A1762AF654AB589490EEB14D45B15DB8AB9C3A1D 96555~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~7EAD2D544489AD655E31D91125EB521626500EC1 96555~|~1~|~2~|~02/S>2~|~Resurfacing, utilizing major rehab funds.~|~~|~D7AC99B942B3377B00D094048AD528B3F43510BB 110412~|~1~|~1~|~01/SAE~|~Safety Funding - 4HJ7 (Federal 90%) / 4BC7 (State 10%) - No CAP - Upgrade of intersection at SR 37 and SR 256 to include turn lanes.~|~21 - Safety~|~5ED69B8BDF1CECFAEC6441D30478A4FC1AC680CF 110412~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~71AEBF25039E7ABE6C3972C7A0127F45BE390256 124312~|~1~|~1~|~01/ENH~|~Construction of pedestrian facilities utilizing Federal TAP and Safety funding up to the CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~AE27D495CF24F3017886617B47ECE5476B1855F9 113415~|~1~|~1~|~01/NHS~|~Concrete pavement replacement on US 250 near McCauley Drive.~|~04 - Reconstruction - No Added Capacity~|~02B65D9F38DC417BAF9716738008495418CB1E15 96004~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge rehabilitation on 1600818 COS-SR 60-7.62 Intersect: Little Wakatomika Creek; Not BR Eligible: Length=73 SD/FO(0) SR=87.5 DSR=8~|~13 - Bridge Rehabilitation~|~F90569D2B5B171549CE7F3D09413E7C12421FB2B 107313~|~1~|~1~|~01/NFA~|~LAW 217 10.70-13.56~|~05 - 4R Maintenance - Resurfacing~|~F9B97875BA0D092AE123C8679335A3D768B582C8 107313~|~1~|~2~|~02/STR~|~LAW 243 7.22-11.59~|~05 - 4R Maintenance - Resurfacing~|~5DCBBA781996473B266646779A2828B742754857 93540~|~1~|~1~|~01/SAF~|~remove slip right lane, add turn lane, redo signal as box span on northbound exit ramp to Galbraith Road.~|~21 - Safety~|~B5ECDC62233A3E9D7DD334BC67A432CD24E5AA9F 98254~|~1~|~1~|~01/STR~|~Preventive Maintenance - Crack Seal~|~44 - Other~|~FCE6FC9355F21E437936D9B87FFCEA43BBBEC900 117180~|~1~|~1~|~01/MPO/STCE~|~Resurfacing.~|~~|~662A34E62121AD43491FA6C3C32050CDBC8E6F39 87156~|~1~|~1~|~01/NHS~|~Replace bridge CLI-68-2003 (sfn 1401262) (20' concrete arch) over Dutch Creek.~|~10 - Bridge Replacement~|~8DE5E641A0DEA30260B64F821A5CA78E5FBB7824 98658~|~1~|~1~|~01/IMS~|~Plan split for all work~|~44 - Other~|~B94D15AE3B5D1B4656CAE0065CA27C7D1A858E0B 121449~|~1~|~1~|~01/SAF~|~Sidewalk Improvement~|~28 - Facilities for Pedestrians & Bicycles~|~D9E0DF0BEF9875F94AA9533293D7B630F6D03B58 97869~|~1~|~1~|~01/IMS~|~Type A emergency repair of the retaining wall~|~44 - Other~|~E2F4C14DD6CD1EE983F0ABDAF4098C71A283B591 108664~|~1~|~1~|~01/STR~|~Culvert and roadway washout repair. DSR HOC-002. 100% Federal ER funds. HOC 93 17.82-17.86.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E062EF5A97A593867711AA09D2E3E8E682C6F26B 117944~|~1~|~1~|~01/NFP~|~Systematic sign upgrades/replacements on various routes throughout District 4.~|~21 - Safety~|~2F5C3605F833B82CD986E5361DF722A1A8A39D47 97320~|~1~|~1~|~01/NHS~|~Plans Split for Rockfall/Bench Cleaning~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~77CF17E7ACE6E683CA8AC9C627A42783C5C870C6 94322~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV/ -~|~05 - 4R Maintenance - Resurfacing~|~2F8FBA7C4ABE4CFDD771388BCC1F6594D7392E09 94322~|~1~|~2~|~02/STR~|~Plan Split 02/STR/PV/ -~|~~|~98FE3927663BF9D7741C8421BAFC552E5426B9B2 77613~|~1~|~1~|~01/S>2~|~TRAC funding for all the bridge work.~|~10 - Bridge Replacement~|~68D86DABC48EB0629A2385C77EAC1205CB8A989E 77613~|~1~|~2~|~02/ENH~|~Enhancement funds for the non-bridge portion of the improvement~|~~|~711D33A78751063DD1EAC49CC40B65FBB64FC54D 96635~|~1~|~1~|~01/NHS~|~Redeck SFN 7700679 SUM SR 8 7.43 Pedestrian bridge over SR 8.~|~~|~500480A812AE3DF431DEACA812EC0B9481CB3F30 84821~|~1~|~1~|~01/BRF~|~Remove existing steel superstructure, widen existing abutments and place rock channel protection in fron of abutments. Place a prestressed, reinforced, non-composite concrete box beam deck superstructure. Complete all roadway approach work necessary for proper roadway geometrics on Wilson Road in Mercer County. SFN 5431441 MER CR 51 1845.~|~13 - Bridge Rehabilitation~|~55A241058CC024AF37F993B257C68A485D9C1CF7 119123~|~1~|~2~|~02/NHS~|~Resurfacing.~|~~|~5D557F26654F6DCC9885C218534A71C6DC65F840 119123~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~AFCEA485C1F46E80FDA2A1A824BE5C1E438F2487 119123~|~1~|~3~|~03/S5K~|~Resurfacing~|~~|~884FE6E78506BFE3A1E73A4250AC6DE5F26F2615 119123~|~1~|~4~|~04/STR~|~Resurfacing.~|~~|~E8B683F07906BCFADCA3AFAAF42DFD43CC01318A 123017~|~1~|~1~|~01/S5K~|~Signals along US 62 in the City of Washington Court House from Glenn Ave to the US 62/US 22/SR 41 intersection~|~21 - Safety~|~63BE7B718E5F5E25D332B1D3CF224A6AC1316EDE 109360~|~1~|~1~|~01/STR~|~Culvert ReplacementROS 327 3.88 (CFN 1837174)~|~04 - Reconstruction - No Added Capacity~|~2451FFDBB25233CFC6400766F511546E60258B07 109278~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using asphalt overlay treatment. MOE 7 2.21-8.65. Major 2 funds. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~FA7545C46D426C7B4884BF2FD7DD7A94B99B2B66 90442~|~1~|~1~|~01/IMS~|~Culvert liner project on NOB 77 0519 (SFN 6100449) and NOB 77 0734 (SFN 6100473). Interstate route funded 90 federal/10 state.~|~13 - Bridge Rehabilitation~|~440DA3F6A63D06E30CC2AB726FEF12AA8C8B0B65 82514~|~1~|~1~|~01/MPO~|~Franklin County sponsor, MORPC funded bridge deck replacementSFN 2532344, FRA-CR225-0.92, Lithopolis Winchester Rd over Little Walnut Creek~|~10 - Bridge Replacement~|~29D243ABDBC47F1B0AD9273979304EBC4D6B6C5E 93421~|~1~|~1~|~01/SAF~|~City to add friction treatment to various locations to reduce wet pavement crashes~|~21 - Safety~|~3EA99F0DEB4BFDBC6E3D5D347E2D073BAE434757 125661~|~1~|~1~|~01/IMS~|~Plan Split for the resurfacing on the interstate~|~05 - 4R Maintenance - Resurfacing~|~50CFECC2CFB71750FE0DF4AF6F4D5092567DD378 105203~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~971C4B04357489E73BEF4678FEA96DF24B23C540 105203~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~B2382C5943A673269A2214603A34D30334F7F2DD 105203~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~49FBFFB00FC0BDD7BB41D9E3908C1B8ABCBB5616 102532~|~1~|~1~|~01/BRO~|~Bridge replacement eligible for municipal bridge funding.~|~10 - Bridge Replacement~|~12B15F00C32321C4E45431399FFDFD003BCF3A6F 113905~|~1~|~3~|~03/STR~|~Bridge Rehabilitation on Resurfacing Project~|~13 - Bridge Rehabilitation~|~6B994F65AA97F89E7109CD2EC00A6F6BFA5303B8 113905~|~1~|~1~|~01/STR~|~Asphalt Concrete Resurfacing / Edge Repair HUR SR 4 00.00 to 6.05~|~04 - Reconstruction - No Added Capacity~|~E04262FE06B97C69A5B2D8E9D2DB4DA904DAD31B 113905~|~1~|~2~|~02/S<2~|~Asphalt Concrete Overlay / Edge Repairs HUR SR 4 6.05 TO 6.66.~|~04 - Reconstruction - No Added Capacity~|~0C67D41AFC978412CCBBEA952731606A5722DBC2 113905~|~1~|~4~|~04/S5K~|~Fed / Local split for HUR-4-6.05 to 6.66 to include surface course, intermediate course, tack coat, prime coat, and compacted aggregate in area included in city limits~|~04 - Reconstruction - No Added Capacity~|~EE7E0BAEC72567C7A5DF562259EB63CCC8ACEF20 125268~|~1~|~1~|~01/STR~|~NOB SR 78-15.70mm culvert replacement. (SFN:1830679)~|~04 - Reconstruction - No Added Capacity~|~E83879D804886AFF82F8F3E13AE21DB7AD5DC49A 94200~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on all lanes of SR 756 in Clermont County from the intersection with SR 743 to the western corp. of Felicity. CLE SR 756: SLM 2.65 to 7.38~|~~|~D710AE4AA5CD4FCB0B3FC5673DE84897CEA71808 122799~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the roundabout~|~21 - Safety~|~29EC8BE51D26B1C13A246D9E202FA052C462F27F 77826~|~1~|~1~|~01/STR~|~resurface Woo SR 199 1.78 to 6.24; ( RURAL ) section CR 84 Pelton Road to West Milgrove south corp line~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4CD8DAEB082039E710331222A02C4D28A176B692 77826~|~1~|~2~|~02/S<2/Fost~|~resurface WOO SR 199 0.35-1.78 ( URBAN-FOSTORIA ) ; from US 23 to CR 84 Pelton Road~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DAE3C9A1B6C6B5151DBFD7CCF8707BC55F84785B 118058~|~1~|~1~|~01/SAF~|~Improve the intersection of SR-235 & Byron Rd by constructing an EB SR-235 left turn lane, relocating the north leg of Byron Rd and cul-de-sac'ing the south leg of Byron Rd.~|~17 - Construction Engineering~|~4F7DFA3A4D9E335C0168EE3765A685B898EF1A5D 101995~|~1~|~1~|~01/NFP~|~Pavement Marking Work Order on various routes throughout District 4.~|~21 - Safety~|~D91C034D4895E3D7ECCB1C743E72389DB43D3AE3 113337~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4CP7 (100% State) - No CAP - Ding-N-Dent Guardrail repair District Wide~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2917AE4023F207385D0399453211046199CA9C5A 109881~|~1~|~1~|~01/STR~|~2024 Operations Chip Seals~|~05 - 4R Maintenance - Resurfacing~|~BE1AEF041ACE147A8AAE1AACA97A2DD668DCE354 123524~|~1~|~1~|~01/STR~|~Plan split for conduit replacement and/or repair~|~04 - Reconstruction - No Added Capacity~|~87762B119216A059385BCA474638B8C4D7ADFCEE 125795~|~1~|~1~|~01/STR~|~Resurfacing HOC SR 595~|~05 - 4R Maintenance - Resurfacing~|~DD9576B92D9886CFA88D8F3B0058C6950F2B060D 125795~|~1~|~2~|~02/NFA~|~Resurfacing HOC SR 595 0.800-3.169~|~05 - 4R Maintenance - Resurfacing~|~90E3C4B557110BDAE692AF764F618D8D87BB9229 126428~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs RIC-13-7.241 to 11.010~|~05 - 4R Maintenance - Resurfacing~|~2E81F53DDE02A034BD1DF05CE5F2763F933E2DD0 96683~|~1~|~1~|~01/IMS~|~Districtwide mowing various routes.~|~44 - Other~|~536E4E88C0EC0673D0DA02265F4D0EC9B94787F1 85255~|~1~|~1~|~01/NHS~|~OTT-SR2 from SLM 14.90 to 18.38 (Rural)~|~05 - 4R Maintenance - Resurfacing~|~985DC8B6A877350DEAEFF244E30AF3EF843E0BE9 124722~|~1~|~1~|~01/SAF~|~Install new/upgrade existing guardrail on various county roads in Clinton County.~|~21 - Safety~|~E8C1095966F87D8E09CA975039C150C2FCAB594C 98268~|~1~|~1~|~01/BRO~|~Replacement of SFN 6400515 (PER-13-19.64)~|~10 - Bridge Replacement~|~738B1D09F8F392CBFD1BC4B807BA61DAD52C1700 106662~|~1~|~2~|~02/NFA/COL~|~Crack sealing of loop road; 100% City.~|~~|~06B77F1C754A10214D92061F9D76097658E53A24 106662~|~1~|~1~|~01/ENH~|~Construction of loop road sidewalk with brick gutter; ADA compliant. 95% federal/5% local.~|~44 - Other~|~46AAEF0842A8685154EA7DF18B42414D9E52FB39 94795~|~1~|~1~|~01/S<2~|~Shave and pave roadway, ADA Intersection improvements. SLM 2.968 to SLM 3.988~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6111614FA6F7EA0B1890878DEB936B299557C1B3 126374~|~1~|~1~|~01/NFP~|~Culvert repair/replacements.~|~04 - Reconstruction - No Added Capacity~|~7CC79B7EACC8F4C57B8435BE74E804AD5048E722 114470~|~1~|~1~|~01/STR~|~Resurfacing HAS-519 from SLM 6.78 to SLM 7.44~|~05 - 4R Maintenance - Resurfacing~|~E1AC481FDBA4529C412A9AC6B8F8DA7CD2DFB46A 114470~|~1~|~2~|~02/NFA~|~Resurfacing HAS-519 from SLM 7.44 to US 250~|~05 - 4R Maintenance - Resurfacing~|~6D69B1E6960112105A9CAAD8F59662181885B6F5 119742~|~1~|~1~|~01/NFA~|~Creating Plan Split for TED Involvement~|~~|~2E38DA397F081BECD1C63FCDD31A6FA7D012248D 87341~|~1~|~1~|~01/IMS~|~Priority System resurfacing on BEL-70-5.04 to 7.61; includes asphalt overlay, pavement repairs and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~E9F9E1BD3710480D846ED36BDEB8E9B914DDE263 95179~|~1~|~1~|~01/BRO~|~Bridge replacement project. NOB 821 11.66 (SFN 6105580).BR eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~8E32C207E2593AB0459354C0D83A629CADA818EC 120270~|~1~|~1~|~01/S5K~|~Pedestrian and bicycle safety improvements within the City of Marietta. Work includes installation of bike racks, sidewalk improvements and crossing improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~A3855A0211AD79F23C62EB1BABDBDA06F9CE027F 115272~|~1~|~1~|~01/NHS~|~Construction of Type II Noise Barrier along US-422 at Harper Road. ~|~17 - Construction Engineering~|~0531EB96929E149AD78F37A0CFF81B7C23EE22E1 101728~|~1~|~1~|~01/NHS~|~Two Year Construction Inspection Agreement to provide general and bridge inspection services District-wide. Estimated fee is $1.0M.~|~17 - Construction Engineering~|~0697C41D92CC6685D67C5A888A83B30613DD1A59 120499~|~1~|~1~|~01/NFA~|~Resurface fish hatchery~|~05 - 4R Maintenance - Resurfacing~|~4E5135AAF8A94AEBB2B1708A1DB057A0F5B68DCC 124660~|~1~|~1~|~01/SAF~|~CEAO HSIP funding for roundabout~|~21 - Safety~|~D57C4EE766D8624B05217D593951E4223D1DAF35 106108~|~1~|~1~|~01/STR~|~DSR BEL-003~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB7EF38A1544F9B3BCA58A60A91EA1C29DAEB00B 108042~|~1~|~1~|~01/NFP~|~Plan split for cracksealing~|~99 - State Preventative Maintenance~|~F88884BB318002A63ED291F51448780BFE57F7FB 97843~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 0731692~|~10 - Bridge Replacement~|~2AAC03C0A9F1A8AE96C001B8683CB409D57EB940 107974~|~1~|~1~|~01/S>2~|~Culvert rehab~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE8E2D643DACD5536BF274A315135EECDDF7C4C9 107974~|~1~|~2~|~02/STR~|~Culvert rehab~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9422F8C06A0A3B09A22A4D74F33BDCBA4126957B 97701~|~1~|~1~|~01/IMS~|~Latex deck overlay. WAS 77 0135 L, SFN 8402973. Interstate route funded 90 federal/10 state.~|~13 - Bridge Rehabilitation~|~D59EFE56B21491277C5E43A34629490A8AEBF559 92932~|~1~|~1~|~01/NFP~|~Culvert replacements on State Route 21, in Summit County, Ohio.~|~44 - Other~|~881AEAF1935C6E62AF7B19CDB405B7C22501968B 108815~|~1~|~1~|~01/BRO~|~Plan split to program project, update prior to plan submission.~|~13 - Bridge Rehabilitation~|~53419BAA7D0B52E8C9F063E25B3FFFCC81190D95 88396~|~1~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items (guardrail removed for storage and Medina County Monument Box)~|~17 - Construction Engineering~|~11AE7AEBFE317AC59ACAD70C48BB1A76EFB4E298 88396~|~1~|~1~|~01/MPO~|~Pavement widening, resurfacing~|~05 - 4R Maintenance - Resurfacing~|~67B9624F92FAE0447BF2DA6C1BBDED8D7E407EDC 112771~|~1~|~1~|~01/IMS~|~Lighting replacements on Interstate routes in D8.~|~21 - Safety~|~32BF0E8067978FDD0EE7FC8A58D3EB90B0C79D6A 97845~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 3840174~|~10 - Bridge Replacement~|~B57FC00F2C8919A20F4CCB747C529404E7A2DC75 96564~|~1~|~2~|~02/S>2/NEW2~|~Plan split for 100% Local Costs.~|~~|~FD715F3E2914AD43005F002CCCB070981FCE5FC0 96564~|~1~|~1~|~01/S>2/NEW1~|~In the village of Newton Falls.~|~~|~6E323D1469EE731971FEBF4C5D81A49365ACEEEC 97290~|~1~|~1~|~01/IMS~|~"01/IMS/CV/ " - District Preservation Culvert Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Inserting culvert liners on; 1) Gue-IR 70-04.32; 2) Gue-IR 70-04.49; GUE-70-00.94, GUE-70-11.03, GUE-70-23.91, GUE-77-10.51~|~44 - Other~|~6102BA293357C81718B8DF75ED6A1A6041A7C85F 97290~|~1~|~2~|~02/STR~|~"02/STR/CV/ " - District Preservation Culvert Program 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Installation of culvert liner on Mus-SR 146-8.09;~|~44 - Other~|~EAE3D5BA63EBA45A04632041001B7F4184931B58 124632~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation and replacement of existing Noise Wall~|~~|~2BEB7309D997A6C27DCCDD80B4598DA4358BA76D 110718~|~1~|~1~|~01/NHS~|~Culvert Replacement BRO-52-15.71~|~04 - Reconstruction - No Added Capacity~|~63AE9D406AF71E643B21A696A0F3596FEB36826A 107443~|~1~|~1~|~01/S<2~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~0F3ED505FE8C4759EE242E9B1C81D1124D3C9E03 107443~|~1~|~2~|~02/STR~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~5E26851BD61753A8E59FBA1146FF444AA8C3FBD6 107443~|~1~|~3~|~03/NFA~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B9E681ABF346221D86EB6D8A05FCA6CEAF8880E7 87695~|~1~|~1~|~01/NHS~|~Culvert Construction/Repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F6C0769922DD0AFF1811F2414E57A0EAD6549783 121669~|~1~|~1~|~01/IMS~|~Replace deck overlay~|~13 - Bridge Rehabilitation~|~CD66866248D24146AAC21A2DC613FEE9A8637A94 79759~|~1~|~4~|~04/NHS~|~Culvert Liner for LOR-10-6.73~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~731E011DE73EDCE0D1B5920735D75427C35838A9 79759~|~1~|~1~|~01/IMS~|~ResurfacingLOR-480-0.97 to 2.17~|~05 - 4R Maintenance - Resurfacing~|~7EC77617968F2F40A61600D0ADA993FCFA6DEC6B 79759~|~1~|~2~|~02/NHS~|~ResurfacingLOR-10-5.23 to 5.49LOR-10-6.25 to 6.53~|~05 - 4R Maintenance - Resurfacing~|~63E6D0A702FA6DF1187E3A969EFE1FE8381B594A 79759~|~1~|~5~|~05/SAF~|~Plan Split 5/1 is 100% safety 4HJ7 for long line r-wr pavement marking optics and grooving. Plan Split 5/2 is 90%4PF7/10%4PS7 for the remaining long line pavement marking costs.~|~21 - Safety~|~6564A7143C157C37F733411021A5CC4D48AF4F8F 79759~|~1~|~3~|~03/IMS~|~Bridges: LOR-IR-480 01.051 LOR-IR-480 01.110 LOR-IR-480 01.150 LOR-IR-480 01.570 LOR-IR-480 01.710 LOR-IR-480 02.040 ~|~13 - Bridge Rehabilitation~|~C36F3A24F70BAB0D9925729BCB3A748EAABA4DAA 116189~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~BA1E954CAED74189CC87DE7BA104A99EB479EF2A 124779~|~1~|~1~|~01/NHS/POLA~|~Install sidewalks and pedestrian enhancements.~|~28 - Facilities for Pedestrians & Bicycles~|~4D6587E843D1E31CA618934CAE46E50B4A6ADD18 88610~|~1~|~1~|~01/BRO~|~Structure rehab over Glen Echo SFN 2500698 - FRA 23-15.56~|~13 - Bridge Rehabilitation~|~CD227FE0573F0BEA454326575637D4A18B535E8D 88610~|~1~|~2~|~02/BRO~|~Remove and replace bridge railing. City of Columbus to fund up to $150,000.~|~13 - Bridge Rehabilitation~|~79B8B8A6506BEF19D535BEA6875DE1F76A1A5068 88610~|~1~|~4~|~04/BRO~|~Items requested by the City of Columbus to be paid 100% by Columbus~|~13 - Bridge Rehabilitation~|~66B84B2CE151C8D2C72590A19F254C33A20FA0B9 88610~|~1~|~3~|~03/BRO~|~Cost for items to be paid 100% Columbia Gas~|~13 - Bridge Rehabilitation~|~DF8339A5A64CB9F98F715064A9183D0317B88B25 118134~|~1~|~1~|~01/MPO~|~MPO STBG funding~|~05 - 4R Maintenance - Resurfacing~|~E60DA24861B155ADFC940094D63B00983531C41A 119495~|~1~|~1~|~01/NFP~|~Plan split for Franklin County ding and dent guardrail on various routes.~|~21 - Safety~|~12CB27ECC43AA1FAEB7EFAA19E922177E9B14A9D 118828~|~1~|~1~|~01/NHS~|~Plan split for work on SR 444 in Greene County.~|~05 - 4R Maintenance - Resurfacing~|~B7E7993F62D1EC8BCA415EB159F67F39772FBEFC 92002~|~1~|~1~|~01/STR~|~ROS SR772 0.00 - 5.97 resurfacing projectOn SR772, it is proposed to resurface the highway beginning at Pike Co. line then north east for 5.97 miles and terminate 0.19 mile NE of SR162M (Hartwood) (SLM 0.00 to 5.97). 80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~D9F6C292DCE5BB170528D8385DBE059A03FC20D6 89413~|~1~|~1~|~01/IMS~|~Maintenance Funds 4CP7 - District Wide contract~|~44 - Other~|~229133EA8F8CCC98FC588D60F982921436BD0DEA 83406~|~1~|~2~|~02/IMS~|~Bridge work on ASD-511-10.60/ASD-071-05.27~|~13 - Bridge Rehabilitation~|~0230DEEA2C4B3B8429970FC57692A7A300832D06 83406~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~579173876AE7135FFA9F325E21F8E60749ACC1A1 83406~|~1~|~3~|~03/STR~|~100% State Funds - 4PS7 for Jointbond product~|~05 - 4R Maintenance - Resurfacing~|~C0AC7329001B3045AED42AAA8EBCC02F2DD1AD30 118942~|~1~|~1~|~01/NFA~|~WAS-TR-55-0.05 SFN 8436665. Bridge Replacement. Funded 100% Federal.~|~10 - Bridge Replacement~|~0FDD7FB939CC3FBAAB11FDF3F8C65ACB630C9486 126339~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~7B2685E2CE48A9FF570D108AB02AB1C1BC8C4EF8 111192~|~1~|~1~|~01/SAF~|~Extend the Wesleyan Bike Path.~|~28 - Facilities for Pedestrians & Bicycles~|~065380C0CDBA212A37D9FCAFC304AF1E94B9DC02 105950~|~1~|~1~|~01/SAF~|~Traffic Signal Reconstruction within the City of Kettering.~|~21 - Safety~|~A5B887755FE532BD2CE75A17D7D49D32D1FE5E0D 112498~|~1~|~1~|~01/STR~|~AC overlay without repairs:MER-49 SLM 4.76 to 13.91AC overlay with repairs:MER-219 SLM 10.29 to 14.12~|~05 - 4R Maintenance - Resurfacing~|~00CA9D0988E61EC80C02D5F8A346DD54359C0A83 117502~|~1~|~1~|~01/BRF/HCEO~|~Replacement of the existing superstructure.~|~13 - Bridge Rehabilitation~|~625DE4583957D8BBFBABB40378790161E89C2C90 102972~|~1~|~1~|~01/STR~|~split 1 STP rural25-chipseal~|~05 - 4R Maintenance - Resurfacing~|~076C2DC4503961E56BFDF71A5C011A0D5AF96225 111531~|~1~|~1~|~01/ENH~|~Preventative maintenance treatment by using a mastic seal on the pavement of the Hockhocking Adena Bikeway. Funded 95% Federal (TRC)/5% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~329F32219D51134C41396A16D0D15081CB03312B 117983~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~2791236203BF7D293FDC708BA88108ABA0180DAA 102404~|~1~|~1~|~01/STR~|~microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~6347B41A0C1783F2D5E43193623296555B4B7A11 120054~|~1~|~1~|~01/SAF~|~Plan Split for SRTS funded scope.~|~28 - Facilities for Pedestrians & Bicycles~|~33D42262024976CEDDF6023F9AB28DBEDAFC412D 117824~|~1~|~1~|~01/ENH/ODNR~|~Shared use path and separated pedestrian path to be constructed along the Main Loop Road low water crossing reconstruction project.~|~28 - Facilities for Pedestrians & Bicycles~|~5DCAEFC73FEB8A5E9808D150636AB06D28DB1AD2 117824~|~1~|~2~|~02/NFP/ODNR~|~Plan split for ODNR cost to replace the Main Loop road low water crossing bridge.~|~10 - Bridge Replacement~|~8E713654E7330E0074EE0000B56F5F27835CD845 113596~|~1~|~1~|~01/S>2~|~Resurfacing of South Dixie Highway from South Corporation Limit to RR Crossing in the City of Franklin.~|~05 - 4R Maintenance - Resurfacing~|~121C49657C4217F4AEB677D189A7DC5E632B6DF6 112433~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~BB10FDBBDDB6AE8A1232BA78E8A8A1F82A5A1E3C 100262~|~1~|~1~|~01/NFP~|~Two year Construction Inspection task order.~|~17 - Construction Engineering~|~1A784321A152A596B83B442E7E01B771D202A54A 122800~|~1~|~1~|~01/SAF~|~Pavement markings on various routes in Highland County.~|~21 - Safety~|~9276F5B438B8EE08585A11CE19FE328BF05E632B 114960~|~1~|~1~|~01/STR~|~Bridge Replacements~|~04 - Reconstruction - No Added Capacity~|~F828262A218F58D530D599D540178CEE909848C9 110634~|~1~|~1~|~01/NFA~|~District 9 construction inspection~|~17 - Construction Engineering~|~883327A4974612F739020D7849DF14391F6CF5C0 110634~|~1~|~2~|~02/NFP~|~CEAO/ ODNR construction inspection~|~17 - Construction Engineering~|~77FB1110F7F5FBD2BF72EEF32348CC266284830D 122141~|~1~|~1~|~01/NFP/CANT~|~School signs/flasher upgrades and sidewalk improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~3337D268C69DA6292B49ABF263591A1412518BDD 106839~|~1~|~1~|~01/SAE~|~Install new and upgrade existing guardrail.~|~21 - Safety~|~71F55CBA51949A5A2661105532F02C74A4BDD654 84021~|~1~|~2~|~02/NHS~|~Plan split for bridge work items~|~~|~182F2308D6BB16FAE74DD738A74B97B88099BA96 84021~|~1~|~1~|~01/NHS~|~80/20 funding split using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~415C4322C6E5EAFAF261EB3542D667172C134561 107369~|~1~|~1~|~01/NFP~|~Restriping along various routes in D5.~|~21 - Safety~|~11B0188E89733BEC685E1EEC4307EAFCBCF02ADD 101164~|~1~|~1~|~01/NHS~|~Overlay US 35 in Montgoery County with smooth seal: MOT US 35 SLM 19.28 to 21.20~|~05 - 4R Maintenance - Resurfacing~|~4A880E8611BCDB851D3312AB1A0F425FA8BBE3BA 116608~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items for FRA-270.~|~05 - 4R Maintenance - Resurfacing~|~360FDB1A788439A1A90A2119115DD4F0D064F65F 118002~|~1~|~1~|~01/STR~|~Bridge repair due to accident~|~13 - Bridge Rehabilitation~|~E88ED0CE21A4FED98FA198655F4E455B29E4E63A 90454~|~1~|~1~|~01/STR~|~Concrete bridge deck overlay project on MOE 537 0003 (SFN 5602912). 80/20% Federal/State.~|~13 - Bridge Rehabilitation~|~1C9AC4EBC136333950F312D47324D2C988B4AA02 94639~|~1~|~1~|~01/STR~|~Construct a high speed roundabout at the intersection of SR 41 (SLM 30.79) and SR 235 (SLM 31.17)~|~21 - Safety~|~BF94F9E91F0C9A09799C3F53EFB4AC3CB2C36AA4 101114~|~1~|~2~|~02/NHS~|~Plan Split for Luc-2-18.62 AW Over the Maumee~|~47 - Bridge Preventive Maintenance~|~194FB2F23EAC871EB334237A49DDC1AEADAB0933 101114~|~1~|~1~|~01/IMS~|~32 bridges~|~47 - Bridge Preventive Maintenance~|~B843F58A650DAF734680FD3E9445762029C71EF6 114674~|~1~|~1~|~01/NHS~|~Project to bridge BUT-4-1816 that carries SR 4 over the railroad and Dicks Creek and bridge BUT-4-1833 that carries SR 4 over SR 73 by replacing the wearing surface and performing other minor repairs.~|~13 - Bridge Rehabilitation~|~7DCA6C7B8B767C748691792291BC5129DDD06C46 101819~|~1~|~1~|~01/BRF~|~Guilford Blvd Bridge replacement.~|~10 - Bridge Replacement~|~11EF2CD52E844CCAFBBA1039C2052ADBD47EEF35 102661~|~1~|~1~|~01/STR~|~Bridge Replacement: LOR-57-6.58 (SFN 4702476)~|~04 - Reconstruction - No Added Capacity~|~C4D4F7BF70E4E10100F776CB458D49F1073CDDB3 107505~|~1~|~1~|~01/STR~|~Resurfacing BEL-147~|~05 - 4R Maintenance - Resurfacing~|~93A7062A4DE3E63A4C2411B93FCAC21CFECFF744 103805~|~1~|~1~|~01/NFA~|~The City is constructing Road improvements specifically extending Progress Drive 995' feet north of existing Commerce Drive. The street extension will be a 28' wide road including base and asphalt wearing course, with curb, gutter and storm sewer/with catch basins.~|~01 - New Construction~|~B803A105D0F2613F18FFF929292A9A3D5C6084ED 108858~|~1~|~1~|~01/NHS~|~Paint Insp. Task Order Contract for FY2019.~|~17 - Construction Engineering~|~BD7344339FFA1F2D89E22BCC643AFBD03C4ED513 108858~|~1~|~2~|~02/NHS~|~Paint Inspection Task Order contract for FY2020 Part A.~|~17 - Construction Engineering~|~18D15E919E4C87183DE070F3F1340C9AE13E0BD1 108858~|~1~|~3~|~03/NHS~|~Paint Inspection Task Order Contract for FY2020 part B.~|~17 - Construction Engineering~|~277F6AEE9FEA393A5B1CA10B9E7F2C854F9CEE78 108858~|~1~|~4~|~04/NHS~|~Paint Inspection Task Order Contract for FY2020 part C.~|~17 - Construction Engineering~|~7B35D7CBDB87760CB32731E312C173CE11EDECBE 108858~|~1~|~5~|~05/NHS~|~Paint Inspection Task Order contract for FY2021 Part D.~|~17 - Construction Engineering~|~C2122AEB5F263307F90E149F3A3CBEC0D259AF10 114788~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~343EA5B0A8EC3A02EB5678D7636DF93CB6F1455E 114788~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan split~|~05 - 4R Maintenance - Resurfacing~|~4C779846C2D178BB501DBA5D2A0BECF31C76B7C3 127071~|~1~|~1~|~01/S>2/CANT~|~Install new sidewalks and pedestrian facilities.~|~28 - Facilities for Pedestrians & Bicycles~|~74665007E2AF4FC8E6811293EE309CB6AFB5BA76 108353~|~1~|~1~|~01/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of SFN 3000000 - Gue-US 22-25.63 carrying US 22 over Crab Creek.~|~13 - Bridge Rehabilitation~|~58A8CD2B80686C71AD43918A938872F2FE8E14D8 111596~|~1~|~1~|~01/MPO~|~Federally eligible work~|~05 - 4R Maintenance - Resurfacing~|~E7F774F884CB7FA7C2B2D6BF9CB7582EAC8A8493 116508~|~1~|~1~|~01/IMS~|~Plan split for weigh station parking lot.~|~44 - Other~|~62AEE94130DC319479371E87AC9164C1EA79503F 123968~|~1~|~1~|~01/S50~|~Resurfacing along CR 43 from Powells Lane to Industrial Park Road - 80% (4TA7/BH11) Federal funds/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~6427AF64EF8C8EACA1BB3F5E41467AB874D444B5 123832~|~1~|~1~|~01/SAF~|~Guardrail FY31~|~21 - Safety~|~050D0ABA8D025677DA0EFC44A3F042E30D2CB252 95989~|~1~|~2~|~02/STR~|~District Preservation Bridge Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP~|~47 - Bridge Preventive Maintenance~|~B4E258829259C0C88413D315F12DE12DFEA18473 95989~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP~|~05 - 4R Maintenance - Resurfacing~|~68FDC4CE542B1A5217FE5417C64A7AB9FDB8AD3E 95989~|~1~|~3~|~03/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Work on State rated Structure~|~47 - Bridge Preventive Maintenance~|~6D8DC58A0FAA375EB05C4D539604D8D39642A697 104001~|~1~|~1~|~01/STR~|~Pavement work in the Village of Arlington including full depth repair. All funds are from the District Preservation Program. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. There are no local funds in this split.~|~04 - Reconstruction - No Added Capacity~|~B8A6DF59D2EEB6A29D34941A38E5A665925172C1 104001~|~1~|~2~|~02/NFP/ARL~|~Non pavement work in the Village of Arlington including curb and gutter, drive approaches and storm drainage. This work in the responsibility of the Village of Arlington to pay for. They received an grant and a loan from the Ohio Public Works Commission (OPWC). Funds will be used in the following order. OPWC grant, OPWC loan, Non OPWC funds from the Village.~|~44 - Other~|~E538375B439105BC2C87687BF228FADCCE73918B 98499~|~1~|~1~|~01/BRO~|~Bridge rehabilition. District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~FBA0B76EE29DA0368A286D974B4E6959FFA94A44 103264~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers.~|~21 - Safety~|~C1FD8AD8D88E16BA7FC80E779030D23317123A5F 108820~|~1~|~1~|~01/NFP~|~Replacing the linked culverts.~|~~|~97717B717112DEA63F29D4CB3F78F16F2412A067 93257~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6403247 PER SR668 15.13 Intersect: Trib Of Somerset Creek; BR Eligible for Replacement: Length=25 SD/FO(1) SR=44.8 DSR=7~|~10 - Bridge Replacement~|~3ABAE0129E53D2421CE25FBCC92A0653916571A6 106348~|~1~|~1~|~01/NHS~|~Bridge Repair due to Accident~|~13 - Bridge Rehabilitation~|~C5F652499EAE8DF91A65BE8145CC6DDDF96A6250 112405~|~1~|~1~|~01/SAF~|~Plans split for CEAO safety funds~|~21 - Safety~|~8C7170D3A887EBCB7454156B77A03E7321B749B5 98506~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 303 0.00 to 1.28~|~~|~9121C2D4956B2DCEFA13A751EFD06DC73DE2E2EA 125858~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. HOC 56 13.581-21.313~|~05 - 4R Maintenance - Resurfacing~|~88B04CCE37B4D5007CD89C5121DCE13BA4A0AF8E 110663~|~1~|~1~|~01/STR~|~All costs for resurfacing on SR 108 in Putnam County from SR 15 to the Henry County Line. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~6F5140837A8B3F39F3ADF2D4B72CE0E188E916EE 96631~|~1~|~2~|~02/NHS~|~Replace raised pavement marker castings and/or lenses. All work on US 24 in Defiance and Paulding Counties, US 30 in Allen and Wyandot Counties, SR 12, SR 15 and US 68 in Hancock County and US 23 in Wyandot County.~|~21 - Safety~|~1C6FFA8524C2E5ADC07A7FD05ED88C30F6022CCF 96631~|~1~|~1~|~01/IMS~|~Replace raised pavement marker castings and/or lenses. All work on Interstate 75 in Allen County.~|~21 - Safety~|~D61896B22B7D56EF4443804C65A22F7E90768C35 96631~|~1~|~4~|~04/NFP~|~Replace raised pavement marker casting and/or lenses. All work not covered by the Interstate, NHS or STP Rural plan splits.~|~21 - Safety~|~679ED021DF6CC83F4B744D9DFD43B243C1279FEE 96631~|~1~|~3~|~03/STR~|~Replace raised pavement marker casting and/or lenses. All work on SR 18, SR 49, SR 249 and US 127 in Defiance County. All work in Hancock County not in the NHS plan splits except US 224. All work on SR 235 in Hardin County. All work in Paulding County except on US 24. All work in Putnam County except US 224. All work in Van Wert County.~|~21 - Safety~|~BCE0142F34EC97E1E4EED617B14B079267CB981C 126411~|~1~|~1~|~01/S50~|~Asphalt Concrete Overlay with Repairs RIC-430-7.004 to 10.066~|~05 - 4R Maintenance - Resurfacing~|~686D9C4FD2BAFBF7A051BF5DB4A2BBAF94F5663B 126411~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs ASD-60-1.478 to 10.520RIC-430-10.066 to 10.127~|~05 - 4R Maintenance - Resurfacing~|~1096BD5888175EC9EE3F67DF09527781BEFE69BB 110279~|~1~|~1~|~01/NHS~|~Plan split for work on HAM-27~|~21 - Safety~|~FD1969CC89967AB5A0D7FF0A5A8D5ECC699DE2FE 118628~|~1~|~1~|~01/S5K~|~Chip Seal ~|~05 - 4R Maintenance - Resurfacing~|~2DE5EF199EAAA095D3858ACDDB46D8C5C78ACFCB 118628~|~1~|~2~|~02/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~E99083EF72650C198CF4BE2D97CCC9D4EFAD6F97 118628~|~1~|~3~|~03/NFA~|~Chip Seal not on federal aid system~|~~|~3675C6F25029E6A4713814F23C527D9F11103B8A 91563~|~1~|~1~|~01/BRF~|~80% federal / 20% local using Municpal Bridge funds to replace the Old Rockside Road bridge over the Cuyahoga River in the City of Independence.~|~10 - Bridge Replacement~|~03ECA6AB50050A233B3C9D4D72B5CD0FB6A1DF34 112870~|~1~|~1~|~01/NHS~|~FRA-33 from SLM 12.08 to 12.61~|~05 - 4R Maintenance - Resurfacing~|~BD2C62F9014D91B29A0D9D651B3E426223424DED 112870~|~1~|~2~|~02/S>2~|~FRA-62 from 27.17 to 27.32 and FRA-62G from 0.00 to 0.04~|~05 - 4R Maintenance - Resurfacing~|~4135B64217ED3E863882F6A0135873017D6DF6EE 121868~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~028B5542E8721A78F7B2EA3C9E9487F5F85959F9 88895~|~1~|~1~|~01/S>2~|~Resurfacing POR SR 303 from 4.98 to 6.10.~|~05 - 4R Maintenance - Resurfacing~|~6D69E70AAB31D8CBFDA8CCAE564CDD0E60883B3D 88895~|~1~|~2~|~02/STR~|~Resurfacing POR SR 303 from 6.10 to 8.72.~|~05 - 4R Maintenance - Resurfacing~|~4FCE8B4A2B94A234594E121352B1C7F73F6EA65B 88895~|~1~|~3~|~03/S>2~|~not BR Eligible, 20ft+ structure, see linked bridge.~|~13 - Bridge Rehabilitation~|~B128039B27FE86A3DFFA7E20085E34DA4608AAC9 88895~|~1~|~4~|~04/S>2~|~not BR Eligible, 10' to 20' structure, see linked bridge.~|~10 - Bridge Replacement~|~9A0C4ED7EBD8CB4A4A118B1157D2AB1EED8BF295 88895~|~1~|~5~|~05/STR~|~Not BR Eligible, see linked structure > 20'~|~10 - Bridge Replacement~|~5534053ADF2C3FD0CA28C107775E0958D7C2BE7E 116004~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~A9A74163B98B4E7ECE90601A847C8F33C540DBCD 116004~|~1~|~2~|~02/NFA~|~SIB Loan for the Village of Ottawa, max amount $257,443~|~~|~CB7A127550B487E57F55F1CB5C56EAD62621F217 116004~|~1~|~3~|~03/NFP~|~SIB loan for Village of Ottawa, max $257,443~|~44 - Other~|~F4BEF3D6A7758D2F2F4AA81B284FC11142EC7C11 107579~|~1~|~1~|~01/STR~|~Plan split for PRE-177 and PRE-725~|~99 - State Preventative Maintenance~|~CE165AD4BE87E6A07FB7DD89AD4F1D7B5F058F47 107579~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~99 - State Preventative Maintenance~|~DD7A94A2FA327AB620DCE704014A988F8E48475E 113557~|~1~|~1~|~01/STR~|~Settlement repair by pavement replacement and subgrade improvement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D01B5E0AF7FA7B992D6A3C894846AE7A6CC618E2 117100~|~1~|~1~|~01/ENH/LCPD~|~"01/ENH/OT/LCPD" - plan split for construction of shared use pathway.~|~21 - Safety~|~37477374D7AF993737A2626F4070BE729D5D0627 117100~|~1~|~2~|~02/ENH/LCPD~|~"02/ENH/OT/LCPD" - construction of pathway along rural section of route.~|~21 - Safety~|~77E5A978323CD193D0C821650B0D6C4F75D9260C 91339~|~1~|~1~|~01/STR~|~2 Lane Resurfacing from SR 309 to Sr 97 (SLM 0.00 to 6.82)~|~05 - 4R Maintenance - Resurfacing~|~0F465586DE392E1AFB5741024EF67249C3392FDC 87823~|~1~|~1~|~01/SAF~|~ODOT Safety project to add turn lanes at Refugee/Chatterton Rd and Noe-Bixby RdLocal sponsor - FRA County Engineer~|~21 - Safety~|~F5081F3ED622C29DF62D86F5D829F195D7A1E181 107208~|~1~|~1~|~01/ENH~|~5th Ave safety lighting in the City of Youngstown.~|~~|~3F8BFB44306C02F996A3E7A3224A74F2100250E9 113882~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~E7B9A21EC1E62203F75A711F376D59723D4D1A1D 100875~|~1~|~1~|~01/SAF~|~RPM contract for FY 2021. 100% State.~|~21 - Safety~|~C2D1AEA987F94C4588B57DC393F8BCB498A258CC 97157~|~1~|~1~|~01/NFA~|~Bridge replacement in the City of Massillon~|~~|~965B4C6BBFCE07FA19F9839B29D7F31A6BA643D7 98603~|~1~|~1~|~01/STR~|~Split for pavement work on GEA-6 and GEA 608~|~05 - 4R Maintenance - Resurfacing~|~E626C867BB92AB74DC815FCB0686491B9D4D3B40 98603~|~1~|~2~|~02/NFA~|~Split for paving the Riveredge Maintenance Facility at 100% state funds~|~44 - Other~|~EAABEB73A31B1B19A2D11F2AD920482C4BAB8DAC 98603~|~1~|~3~|~03/IMS~|~Plan split for drainage work on I-77~|~44 - Other~|~39583A0F09DE0190A82E6266B419EA5AF58DF456 98603~|~1~|~4~|~04/IMS~|~Split for pavement work on I-90 in Lake County~|~44 - Other~|~687878E3C0AF2CCBC3887487657A170F9A83B065 115721~|~1~|~1~|~01/SAF~|~Safety Funded~|~21 - Safety~|~EF87B37B3D53EA2713DBD8FE61F163606903E716 110357~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into a roundabout.~|~21 - Safety~|~1A38EA9EE17C21EFC5517A01B2094E58FF86AC71 110357~|~1~|~2~|~02/NHS~|~Bridge work to HUR-20-1774 Deck Overlay with asphalt water proofing deep beam rail retrofit~|~13 - Bridge Rehabilitation~|~A3C0C4659937EE2AA9FC9458834B1D0B953C8796 117134~|~1~|~1~|~01/MPO/GCEO~|~Resurfacing of Federal Road from Old US 35 to Selma-Jamestown Road.~|~04 - Reconstruction - No Added Capacity~|~7B8C7467AF32E48C834677A97BBE172FA35D185D 103942~|~1~|~1~|~01/STR~|~Pavement repair on SR 190.~|~44 - Other~|~6EFDAC084B4B95E75D0D82FD3B0FC9C682B9ED21 107812~|~1~|~1~|~01/MPO~|~Resurfacing of Graham Rd from RR to Elm Rd within the City of Stow.~|~05 - 4R Maintenance - Resurfacing~|~2C7DBACA6E1139641E4713C23BA3EF045798AACE 100284~|~1~|~1~|~01/NHS~|~Microsurfacing of TRU-SR 7 from 8.75 to 8.96~|~05 - 4R Maintenance - Resurfacing~|~F56C5A73C131D50F62B1D4A2BDB0FC40E379BE50 100284~|~1~|~2~|~02/STR~|~Microsurfacing of ATB US 6 from 20.61 to 23.17 and ATB US 6D from 0.00 to 0.06, ATB SR 7 from 2.37 to 7.44, ATB SR 85 from 0.00 to 1.32, TRU SR 7 from 9.32 to 12.64.~|~05 - 4R Maintenance - Resurfacing~|~ED098D59F96C2F9EE7459AE2E8C313329609DE51 100284~|~1~|~3~|~03/S>2~|~Microsurfacing of TRU SR 7 from 8.96 to 9.32.~|~05 - 4R Maintenance - Resurfacing~|~EAA5B6B804EC5CBD85FFDD7242B4EE52158FFA2C 92729~|~1~|~1~|~01/MPO~|~Wooster Rd West CR 96 1.37 - 1.88~|~05 - 4R Maintenance - Resurfacing~|~F6F5F547921980F21D702912CD4E744B4ECE2F29 84878~|~1~|~1~|~01/BRO/PCEO~|~County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) Credit Bridge Available to make 95% Federal /15% CB/ 5% Local - See CAP Comments - Bridge replacement Moxahala Creek; BR Eligible for Replacement:~|~10 - Bridge Replacement~|~C7DF1A1683FE2F0EA703051B75EEEA3B316EF92C 108682~|~1~|~1~|~01/SAF~|~Safety Plan Split~|~21 - Safety~|~32DA48D8FF647721656E10529DB25FCE7AD85642 108682~|~1~|~2~|~02/NFP~|~Adding new part code per Madison Booth~|~21 - Safety~|~F552A7D317D19CC7E0755F9077B3F62A834FD220 124522~|~1~|~1~|~01/STR~|~stp rural ps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~853E5307662585179D3827CD3E500ACCDEA8540E 121006~|~1~|~1~|~01/NHS/MONR~|~Plan split for the 80/20 items on the City of Monroe portion~|~05 - 4R Maintenance - Resurfacing~|~707EC6764839B0050457DC8D6B8C789AEDD6B87A 121006~|~1~|~2~|~02/NHS/MONR~|~Plan split for the 100% City items on the City of Monroe portion ~|~05 - 4R Maintenance - Resurfacing~|~1C4E2475F77249AEC598246C3EACBBA533EC53E9 121006~|~1~|~3~|~03/NHS/MIDD~|~Plan split for the 80/20 items on the City of Middltown portion ~|~05 - 4R Maintenance - Resurfacing~|~0E328BA245112D6F8A32D11BE9D59DCD66B70BEF 121006~|~1~|~4~|~04/NHS/MIDD~|~Plan split for the 100% City items on the City of Middletown portion ~|~05 - 4R Maintenance - Resurfacing~|~279671B94E7279F65D99AF9992754F47CADEF2FC 101145~|~1~|~1~|~01/S<2~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~4BB22AF2D36B291FDFB67AE09398E6ECC9D0358A 101145~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~57245C7514E9F70846486FE732C39A44DA65E300 111806~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at Sawmill Road and Presidential Parkway~|~21 - Safety~|~1F5C136A1E1FB5F0392BD5C04922CE45F88C836A 117610~|~1~|~1~|~01/BRF~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~6B4A8545F50ED6366ABD032E775E842D4738A0F3 125242~|~1~|~1~|~01/MPO~|~City of Hamilton EV projects 2026~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~5DDBD36397931D61CC518662A42B1E7138B11425 95995~|~1~|~1~|~01/NHS~|~SFN 8701253 slope protection~|~13 - Bridge Rehabilitation~|~9F5A5A0F93ECD4ED89A74744CFAA6E80AD805A63 121376~|~1~|~1~|~01/MPO/KENT~|~Pavement reconstruction.~|~04 - Reconstruction - No Added Capacity~|~57C5C0C0E9503DC6492894107E9B5AF9E8269E7F 121510~|~1~|~1~|~01/SAF~|~TSG & Lighting Maintenance~|~21 - Safety~|~716A17A978C8CF7E3EE14E497D84EAD73E0D83E9 108986~|~1~|~1~|~01/IMS~|~Repair of noise walls on the Interstate system~|~20 - Environmental Only~|~26A8BD7B9D0828F4C03464DE16DAC29320F662F1 118716~|~1~|~1~|~01/MPO/STPK~|~Resurfacing of the Stark Parks Hoover Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~1700652B8EEBD758C906D27188653EE8CC13E547 102616~|~1~|~1~|~01/NFA~|~Construct an addition to existing CS pole building, and either replace roof structure of existing salt barn or construct new.~|~44 - Other~|~0E8B0E5FEB3F3BCC6BFEF52CA171355830AF0219 91420~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2021~|~47 - Bridge Preventive Maintenance~|~E39651001DDA41A29435D58C8113F871F29BD443 103423~|~1~|~1~|~01/SAF~|~Construction of traffic signal.~|~21 - Safety~|~3C3D54BACEC193352A812E86E010B1E2BE43A8D6 109933~|~1~|~1~|~01/NHS~|~Flat Sheet sign replacement project in FY2025 GAL county. NHS routes.~|~21 - Safety~|~39A00E5653E0F65F49D13FA6361F83485CEAE42D 109933~|~1~|~2~|~02/S5K~|~Flat Sheet sign replacement project in FY2024 GAL county. Urban routes.~|~21 - Safety~|~41B7E222368D7639175AD273D0041A4664F3D3D7 109933~|~1~|~3~|~03/STR~|~Flat Sheet sign replacement project in FY2024 GAL county. Rural routes.~|~21 - Safety~|~47360F84A9A7F0EE46FECF04244DC2CF634FEFBA 109933~|~1~|~4~|~04/NFA~|~Flat Sheet sign replacement project in FY2024 GAL county.. Not on the federal aid system routes.~|~21 - Safety~|~54161C521B5125B6C649DE6372396436880E7C13 109783~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~D51D6187BBF64FE3EC4C5EB55B6ABD285FD9E9D5 109783~|~1~|~2~|~02/NFA~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~CFAB651814482DE011373745E88086ACB58BB5E2 109783~|~1~|~3~|~03/NFA~|~To remove and replace failing thin lay asphalt. ~|~05 - 4R Maintenance - Resurfacing~|~27D87FEF383DE539FF456CD1F12745127ACD5E6C 100589~|~1~|~1~|~01/STR~|~LAW 243 (7.22-11.59)PIK 335 (7.90-14.55)~|~05 - 4R Maintenance - Resurfacing~|~4DDE7EED7B7408DD895C8DF4A330CD93E41356BC 100589~|~1~|~2~|~02/NFA~|~LAW 218 (0.00-2.42)~|~05 - 4R Maintenance - Resurfacing~|~C45F754C3DF9AFB9EDE8968670677D340F4EEEF5 100614~|~1~|~1~|~01/STR~|~Plan Split for the Rural portion of SR 122 in Preble County from SLM 19.04 - 24.45~|~~|~45F0D665DE005C3515C5BE798324B514D48D3BB3 119276~|~1~|~1~|~01/S>2~|~Replace FRA-605-2.69 structure (SFN 2516764) over Schleppi Run~|~04 - Reconstruction - No Added Capacity~|~1A8077C4AC845BADF8768CDFCEEC6EC484D4E41F 118050~|~1~|~1~|~01/STR~|~Landslide repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~41B4ABC3068694C50E3DC86890C5D08DB8053756 118633~|~1~|~1~|~01/NFA~|~Culvert replacement.~|~~|~E3AF3248D6FEDB3BA5D988BF246A15D12CEB5FB1 97962~|~1~|~1~|~01/STR~|~SR 274 SLM 15.24 to SLM 17.77 (OC 000) - Resurface the existing roadway with asphalt concrete (2.00 in)~|~~|~5045BF0C9526FA46A91C8F6BC88DC97BA2FF2DD6 98098~|~1~|~1~|~01/NHS/COLS~|~NHS Urban Paving Columbus SLM 23.04 to 24.31~|~05 - 4R Maintenance - Resurfacing~|~233E9073A5A9B635377913511D2938A32B48E170 98098~|~1~|~2~|~02/NHS~|~NHS Resurfacing 80/20 SLM 22.91 to 23.04; 24.31 to 24.47~|~05 - 4R Maintenance - Resurfacing~|~E23F78F01EE35C210D03FEA162A6C203E8181484 117212~|~1~|~1~|~01/SAF~|~Installation of raised crosswalk and bump-outs on Harrison Ave at Ruehlman Place and on Central Ave at W 8th St. Includes new curb ramps and drainage improvements as needed. ~|~~|~EB0BE9A309CF3D3B721CAC302293926229243184 89265~|~1~|~1~|~01/NHS~|~Split for eligible paving work.~|~05 - 4R Maintenance - Resurfacing~|~D923AB0A7ACDFA87157C5B9292D6BF55499DCFC3 89265~|~1~|~2~|~02/NFP~|~Split 2 for work not eligible for urban paving funds.~|~05 - 4R Maintenance - Resurfacing~|~6724CDCDF8C6A72CCE7438DCE65462F59AB36EF4 116956~|~1~|~1~|~01/NFA~|~Culvert replacement project. MRG SR 376 14.60 (CFN 1845391). Not on any federal aid system.~|~04 - Reconstruction - No Added Capacity~|~8322427DD69840F52F96B67B382213D93808407E 89182~|~1~|~1~|~01/MPO~|~ OKI Project includes the addition of auxiliary turn lanes, sidewalk along the east side of Montgomery Road, and signing and traffic signal modifications. Montgomery Rd: Pfeiffer Rd to Bethesda North Hospital main access; Pfeiffer Rd: approx. 1 mi W of Montgomery Rd to Montgomery Rd~|~21 - Safety~|~D78074FBCC4482B71BCD48E027B1ABF214A98CAE 117996~|~1~|~1~|~01/BRF/CTID~|~Replacement of the superstructure of Bridge CLE-CR 54-2.16 (SFN: 1358154).~|~13 - Bridge Rehabilitation~|~5E6120FB9246BD11087B7CF230320C7F62D43641 118336~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at WAY-585-02.73/Geyers Chapel Rd~|~21 - Safety~|~289AF65BE99167597DE43D0E02D6715D5F14D14B 105584~|~1~|~1~|~01/NFP~|~Bridge Painting~|~13 - Bridge Rehabilitation~|~6A82AF138CA5E1EFDE5227EF3AED7DD5AD43B1D5 122080~|~1~|~1~|~01/IMS~|~Plan Split to replace portion of conduit~|~04 - Reconstruction - No Added Capacity~|~7BF97E67B97F31802D468BDB6897CDF452314A35 116868~|~1~|~1~|~01/ENH/HUDS~|~Construction of a multiuse trail.~|~28 - Facilities for Pedestrians & Bicycles~|~4F5796CC62110E1B3DD966FE3FD1B85431C79B0E 93107~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Fai-SR 188-16.02 to 16.53; 2) Fai-SR 188-16.74 to 17.01; 3) Fai-SR 188-17.30 to 19.05;~|~05 - 4R Maintenance - Resurfacing~|~64D10324F3BE3E9517A7E4516D9B2857489A1DCB 93107~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Fai-SR 188-19.05 to 24.53;~|~05 - 4R Maintenance - Resurfacing~|~A47E327C9C6A714B32B3B2EA5A7A196489C531AE 93107~|~1~|~2~|~02/S<2/LANC~|~ District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - CAP (See Project CAP Comments) - Urban Paving resurfacing with related work on: 1) Fai-SR 188-16.53 to 16.74; 2) Fai-SR 188-17.01 to 17.30;~|~05 - 4R Maintenance - Resurfacing~|~AEE6A6CFCECFC6A259F70650BA69A8618DE7AFC0 93107~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on: 1) Fai-SR 188-24.53 to 26.53;~|~05 - 4R Maintenance - Resurfacing~|~C65F94889067EBB203D8793AFC5B6F13E514BCC7 92681~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete on DAR SR 118 from SLM 16.61 to SLM 17.67 at DAR/MER County Line.~|~05 - 4R Maintenance - Resurfacing~|~DDD26394E6F6A580EA208479B9A304DFB031F159 104840~|~1~|~1~|~01/NFP~|~Split for traffic signal work~|~44 - Other~|~9DA07D21BA6DAC1AF6F141DD5B8277FC41422A44 116491~|~1~|~1~|~01/S5K~|~Created for J&C Involvement~|~44 - Other~|~C4BE20141716BBEDCDE6A8438568C865FE20C222 93802~|~1~|~1~|~01/NFP~|~"01/NFP/BR/ " - Bridge Strike Funding 4SR7(100% State) - CAP of $147,273.22 - Repair of 6002730 MUS SR60G 00.32 Intersect: IR 70; BR Eligible for Rehabilitation: Length=211 SD/FO(2) SR=74.9 DSR=5~|~13 - Bridge Rehabilitation~|~44EBA6F0E7F8DE667E92C71F0BAE85C903B14527 93802~|~1~|~2~|~02/NFP/ZANE~|~"02/NFP/OT/ZANE" - City of Zanesville - 4BG7 (100% Local) - Sidewalk repair on the State Street Bridge (Mus-SR 60G-00.32) over IR 70 in the City of Zanesville. - CAP District Preservation of $911.00 ($828.18 - 4PS7-005 and $82.82 State Labor)~|~13 - Bridge Rehabilitation~|~BAF0733FE979BB4BE9ABEFECCE5D8125EF7A4CBD 89693~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work in this project using MPO Enhancement funds.~|~28 - Facilities for Pedestrians & Bicycles~|~DFD218D76CAC4B39C88CC6DE8C659CEE04AA42F9 117987~|~1~|~1~|~01/BRF/KCEO~|~Replacement of bridge on KNO CR 9 1.05 (SFN 4230272).~|~10 - Bridge Replacement~|~E64A476A64C2EB194242DDAC564ED0BF26D9933E 123536~|~1~|~1~|~01/IMS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~6BD6DE4ED717A50601B8068E49F76F59C0BA071A 123536~|~1~|~2~|~02/NHS~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~41737AF161F49B8D2845FC4CE5EE14CFB261C3BE 93014~|~1~|~1~|~01/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Resurfacing with related work on the Priority portion of Mus-SR 16-06.41 to 11.58~|~05 - 4R Maintenance - Resurfacing~|~7472E121B9463F743E700BFEB7E97C84DAA0E2E4 93014~|~1~|~2~|~02/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Resurfacing with related work on the General portion of Mus-SR 16-11.58 to 11.74~|~05 - 4R Maintenance - Resurfacing~|~BF927143C39836020102B25C56CB310C75D86DD9 93014~|~1~|~3~|~03/NHS~|~"03/NHS/BR/ " - No Cap - 80% Federal (4PF7)/20% State (4PS7) - deck sealing and related activities; installation of MSE wall between forward and rear abutments at MUS-16-7.69 L and R (SFNs 6000118 and 6000347).~|~13 - Bridge Rehabilitation~|~BBB5D33007A3D7E6C619A94511DAA5AECC08E277 105450~|~1~|~1~|~01/STR~|~AC Overlay with Repairs~|~05 - 4R Maintenance - Resurfacing~|~9F8FFF22F368C505E3E2CE961EDAE7238551002B 105450~|~1~|~2~|~02/STR~|~Bridge work to determined later.~|~13 - Bridge Rehabilitation~|~A0E0F8E4B19E1036DE5BFAD40A9BB084681A2B41 112606~|~1~|~1~|~01/ENH~|~Add new sidewalks along SR 193 and Warren Sharon Rd in Vienna Township.~|~28 - Facilities for Pedestrians & Bicycles~|~50BE39845BE14D299B0604878E01E04167776934 94808~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 0.00 to SLM 0.26~|~~|~B2504F444E1F03F54804969CF9CDDC58613E4B92 110674~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7EED9E429639E1B4FF6AED69EDC7065DC1FA39E7 96329~|~1~|~1~|~01/STR~|~On US62 it is proposed to resurface the highway with asphalt concrete begining at the Brown County line and heading west for 10.38 miles.~|~05 - 4R Maintenance - Resurfacing~|~596346321DF9765262C01B68B2FE09159F3BEB11 106663~|~1~|~1~|~01/ENH~|~Work to enhance the pedestrian access in downtown Olmsted Falls that qualifies for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~34A7A715BAF12B7C095F12C886B419CC9E1BC576 125481~|~1~|~1~|~01/NFP~|~Pruning.~|~44 - Other~|~B9D1EFD19E93379D13442CFD514E2524B2F375E3 100631~|~1~|~1~|~01/STR~|~Chip sealing of CAR-171 and CAR-542~|~05 - 4R Maintenance - Resurfacing~|~4B32C2C7FFC9DF7F1E6D43D5D81B1EC0AF322C34 96516~|~1~|~1~|~01/S<2~|~Resurfacing of STA US 62T from 0.00 to 0.60 and 1.73 to 4.40 eastbound, 0.00 to 1.08 and 2.35 to 4.40 westbound.~|~05 - 4R Maintenance - Resurfacing~|~3E571AD8BA9B5C9E1E74C34576538A6E28A8B9E8 94349~|~1~|~1~|~01/NFA~|~Bridge replacement project on MEG 143 15.36, SFN 5302552. Not on the federal aid system funded 80 federal/20 state.~|~10 - Bridge Replacement~|~6AFA65F41518F50C0C03385E5972371F788B72FE 90234~|~1~|~1~|~01/CMQ~|~"01/CMQ/OT/Steu" - In Steubenville, improve the intersection of Lover?s Lane/Fort Steuben Dr by possibly installing a roundabout, including full depth pavement replacement on Lovers Lane and improving the approach on Fort Steuben Drive. Project includes curbs, sidewalks, curb ramps, pavement markings. Limits are from Preston Rd to ~800? north of intersection.~|~21 - Safety~|~03E01F85A55EC6509F00E15E6662FD3FC87C966A 110127~|~1~|~1~|~01/S<2~|~PIC-188-2.57 to 2.88~|~05 - 4R Maintenance - Resurfacing~|~903C092DF5EAB362AC6654275E1C6E1EBCB74575 110127~|~1~|~2~|~02/STR~|~PIC 188 from 2.88 to 8.03, MAD-323 location, PIC-138 location, PIC-361 location and UNI-37 Location~|~05 - 4R Maintenance - Resurfacing~|~C1E5D037F55C5BFAF67A893E03C9D796B64D2CD2 110127~|~1~|~3~|~03/NFP~|~FAY-753 location~|~05 - 4R Maintenance - Resurfacing~|~75AAE7E0C7E0AB1B80E34BFCD850779C2F265C81 88737~|~1~|~1~|~01/STR~|~Polyester Pavement Markers added throughout the District on various locations~|~21 - Safety~|~24F34F48153F1E2F2937E69D98F63548B3B947FA 85369~|~1~|~1~|~01/NHS~|~80/20 federal/local split for all Urban Paving eligible work.~|~05 - 4R Maintenance - Resurfacing~|~82F14F7811E7C00CF192F945ACAE8AF31BFD7B14 85369~|~1~|~2~|~02/NHS~|~100% local participation items of work such as curb ramps, etc.~|~05 - 4R Maintenance - Resurfacing~|~2732FA75939CA061685AB706A088FD800C1C27AC 124907~|~1~|~1~|~01/S>2~|~Shared use path on Davidson Road from Raindrop Way to Trueman Boulevard.~|~28 - Facilities for Pedestrians & Bicycles~|~EB605E69E0A098CF32EC42D2A73AF1B44E59E8EC 124907~|~1~|~2~|~02/S>2~|~Shared use path on Davidson Road from Raindrop Way to Trueman Boulevard.~|~17 - Construction Engineering~|~CAEA4015B96095C468DC0D0FF8987D2A8D2D8523 119068~|~1~|~1~|~01/MPO~|~sidewalk on Poole Road from Cheviot to Colerain Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~91FFDB42075632B74C787714B797CC679973E100 112500~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work at 100% Local cost for resurfacing work from Daisy Lane to the South Russell west corporation line.~|~05 - 4R Maintenance - Resurfacing~|~7136CD5779F3C292925D2BDA374C0527C637DA1F 112500~|~1~|~1~|~01/MPO~|~Plan Split for MPO-funded eligible work for resurfacing Washington St. from Daisy Lane to SR-306.~|~05 - 4R Maintenance - Resurfacing~|~92BC2F44433440BA74474B2A9A91A1ED5419EC50 84868~|~1~|~1~|~01/IMS~|~90/10 IM funding for replacing existing pavement and for widening shoulders (80% of pvmt costs)~|~04 - Reconstruction - No Added Capacity~|~11454086D52D92482C359780907E7A33C78AFBE1 84868~|~1~|~3~|~03/IMS~|~90/10 IM funding for bridge rehab on 4 structures (10-20'):SFN 2507048 FRA-71-6.00 Harris RunSFN 2507064 FRA-71-7.85 Patzer DitchSFN 2507072 FRA-71-9.00 Mulberry RunSFN 2507129 FRA-71-9.11 Grove City Creek~|~13 - Bridge Rehabilitation~|~4D2CAD3AD61C2C81AD239955EB0A6F37BBA78D16 84868~|~1~|~4~|~04/IMS~|~90/10 IM funding for bridge replacement (no added capacity) on 2 structures:SFN 2507080 FRA-71-9.03L White RoadSFN 2507110 FRA-71-9.03R White Road~|~10 - Bridge Replacement~|~7E47817D5E709587FF7BF2DEF3E8395484476E3A 84868~|~1~|~2~|~02/NHS~|~80/20 NHS funding for adding third lane in median (20% of pvmt costs - 12/60)~|~03 - Reconstruction - Added Capacity~|~90CF629133AB904B0387C7492AEBD555B6B05917 84868~|~1~|~5~|~05/NHS~|~80/20 NHS funding for adding capacity on 2 structures:SFN 2507080 FRA-71-9.03L White RoadSFN 2507110 FRA-71-9.03R White Road~|~10 - Bridge Replacement~|~98F1350A769FDD88476FFDA0529732CE9136B854 84868~|~1~|~6~|~06/IMS~|~Payment to contractor for using 4D model~|~44 - Other~|~E9B5BAE4B260477B92E03C69F9E5BE7F7CFCAC3A 105460~|~1~|~1~|~01/S>2~|~Plan split for 674 bridge in Columbus~|~10 - Bridge Replacement~|~90D5C17B9A062D5D108F03E8EB285FA4F218887C 91831~|~1~|~1~|~01/IMS~|~Work on DEL-71, FRA-71, FRA-270, and MRW-71~|~05 - 4R Maintenance - Resurfacing~|~4832ABF1F10529C7B920A705690ABBDC3F46A515 91831~|~1~|~2~|~02/STR~|~Work on FAY-22-10.98 to 17.36, FAY-38-0.00 to 0.81, FAY-38-1.72 to 8.95, MAD-161-1.32 to 3.62, MAD-42-13.43 to 24.64, and MAD-42-9.86 to 12.35~|~05 - 4R Maintenance - Resurfacing~|~39F203AD01384F6CB19A165A45331F7CD0691FA2 91831~|~1~|~3~|~03/S<2~|~Work within Washington C.H. Urban Area. FAY-22-10.47 to 10.98~|~05 - 4R Maintenance - Resurfacing~|~3A87BD1BF35E7796DC7D4112ED78173F6F2DA0EB 91831~|~1~|~4~|~04/S<2~|~Work within the London Urban Area. MAD-42-9.19 to 9.86~|~05 - 4R Maintenance - Resurfacing~|~E168DA2ED27DFC7753B1D98485B7B36394B085C1 91831~|~1~|~5~|~05/S>2~|~Work within the Columbus Urban Area. FRA-161-0.00 to 0.83~|~05 - 4R Maintenance - Resurfacing~|~2E6EBCF509F2878861E232A7FC2D34C08C7041A9 84623~|~1~|~3~|~03/NHS~|~NHS Bridge deck overlay 80/20 Fed/State FAY-35-2.58 L/R and FAY-35-6.42 L/R~|~13 - Bridge Rehabilitation~|~1D7FF76A0E345C09A663311CD4481AC8C79D904A 84623~|~1~|~1~|~01/NHS~|~NHS pavement resurfacing, FAY-35: 0.00-11.95~|~05 - 4R Maintenance - Resurfacing~|~56215D3A4C298F771A8D2548FC60C16D792C7B97 84623~|~1~|~2~|~02/NHS~|~8 structures for NHS bridge funding (not BR eligible):2400227 FAY US35 2.58 Intersect: Over Rattlesnake Creek2400359 FAY US35 6.43 Intersect: Over Milledgeville-Octa2400383 FAY US35 2.58 Intersect: Over Rattlesnake Creek2400448 FAY US35 6.43 Intersect: Over Milledgeville-Octa2400790 FAY CR12 9.44 Intersect: Over Ford Rd/Sugar Creek2400839 FAY CR11 11.84 Intersect: Over Palmer Rd.2400898 FAY CR11 11.84 Intersect: Over Palmer Rd.2400928 FAY CR12 9.44 Intersect: Over Ford Rd/Sugar Creek~|~05 - 4R Maintenance - Resurfacing~|~841AF667C8E88A1B0A93F1D60D234D4A8EC0D4CA 117408~|~1~|~1~|~01/SAF~|~Safety improvements of SR 605~|~16 - Right of Way~|~225775B69BAA755307CC59F51C7F16E78D9894F8 114943~|~1~|~2~|~02/S>2/STRE~|~Resurfacing, urban paving in the city of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~BA6F79B5A1402184573753229A76C108523E2129 114943~|~1~|~1~|~01/NHS/SRTE~|~Resurfacing, urban paving in the city of Streetsboro~|~05 - 4R Maintenance - Resurfacing~|~347ED0AD4B3E815FEF34275957BF97054329E5AD 114943~|~1~|~3~|~03/NHS~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~C685242A3A95113B5C41E8939F17243CED5E2FD6 114060~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction expenses.~|~05 - 4R Maintenance - Resurfacing~|~9C76818C9DF4E4F218CF186860C9CCD066F5AAA7 114060~|~1~|~2~|~02/STR~|~Plan split for 100% locally funded items~|~05 - 4R Maintenance - Resurfacing~|~B0070D9D2ECC3F0F1462AC7D71A00B4478D48D8A 83137~|~1~|~4~|~04/STR~|~Rural Guardrail upgrade/replacement. WAS 550 11.24-19.70. 80% Federal and 20% State.~|~21 - Safety~|~80A776B2DB3E39699B3507A1E24F39493458447E 83137~|~1~|~3~|~03/S<2~|~Urban area for Guardrail replacement. 80% Federal/20% State.~|~21 - Safety~|~B2A8981B554EFDD473F3738902321EC420F61087 83137~|~1~|~2~|~02/NHS~|~NHS system guardrail replacement. 80% Federal/20% State.~|~44 - Other~|~B7CC09F425EC49891C11E00DB9EC84B358114CF9 83137~|~1~|~1~|~01/SAE~|~Replace Type A end assemblies in various locations on Project. 100% Federal Safety Funds.~|~44 - Other~|~EDEBDA38D6F60F9FED124DE358010E3DD517676A 119876~|~1~|~1~|~01/BRF~|~Plan split for bridge replacement work.~|~10 - Bridge Replacement~|~E56A1EA9922E0B45298D952E4F66AF87F99119B0 119876~|~1~|~2~|~02/BRF~|~Plan split for non-eligible work at 100% local cost.~|~10 - Bridge Replacement~|~3600993BE845DDFF251CC882582C7D3F6F1AD381 114816~|~1~|~1~|~01/S<2~|~STP<2 plan split.~|~05 - 4R Maintenance - Resurfacing~|~0D17FDFE71D70D1E5E579A0938E3A47CFEDB126A 114816~|~1~|~2~|~02/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~39C12E6DC8E7580FBDE767E07CA10D3FAE5C58DA 108179~|~1~|~1~|~01/STR~|~ER event - repair landslide that occurred along SR 123.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4A073EC5E9221B40C43E6489C8E270CE7497FEF8 98042~|~1~|~1~|~01/NHS~|~NHS Pavement 80/20 SLM 11.85 to 12.01~|~05 - 4R Maintenance - Resurfacing~|~C67F847B3D799A5213EA0ED23557C38446D4A2A6 98042~|~1~|~2~|~02/S>2~|~STP Pavement 80/20 SLM 12.01 to 12.79~|~05 - 4R Maintenance - Resurfacing~|~F85407E93809601E9B68F226C7415F9BA1E888AB 95803~|~1~|~1~|~01/NHS~|~WOO-20~|~05 - 4R Maintenance - Resurfacing~|~444E903BE4D44F7F2701FDA4166BB6E2E50BD71A 101239~|~1~|~1~|~01/STR~|~Resurfacing of SR 163 and SR 19.~|~05 - 4R Maintenance - Resurfacing~|~239E76204C27DACF5C64CD78379069694ACE391C 110618~|~1~|~2~|~02/S>2/COP~|~City of Powell Plan Split: DEL-750-2.26-3.87~|~05 - 4R Maintenance - Resurfacing~|~12967420B4F83CA2D315F4746DC63043AE44FE6A 110618~|~1~|~3~|~03/S>2~|~100% City of Powell Plan Split~|~05 - 4R Maintenance - Resurfacing~|~392B1893C2D01705C981FE490ED1EC443D54A0E9 110618~|~1~|~4~|~04/S>2~|~Replacement of DEL-750-4.188 storm sewer conduit~|~05 - 4R Maintenance - Resurfacing~|~F0FCEED787D08947573A25F1B65CD5C6787398EB 110618~|~1~|~1~|~01/S>2~|~Urban Area Plan Split: DEL-750-2.17-2.26, 3.87-4.22~|~05 - 4R Maintenance - Resurfacing~|~CC4E5BB9BD6F07319AE32977DA74169E9D9F78AC 105035~|~1~|~1~|~01/STR~|~All work associated with the construction of the park & ride.~|~05 - 4R Maintenance - Resurfacing~|~F40617C43EE26CFD995EE330908BE505DEA65BA8 100356~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~7EEC4FB3C93BBEB3257A162F71000DE25E10B2F8 87741~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1C549087834A8657F56C1A62167A52181A4DB578 100353~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~B01049B65C5ED1FB0C21D121FB0F9BBA41595A6D 96660~|~1~|~1~|~01/IMS~|~Plan split for bridges WAR-71-0757L/R, WAR-71-0841L/R and WAR-71-1371 including any incidental roadway work for WAR-71-1371 in this plan split.~|~13 - Bridge Rehabilitation~|~DE57EADE1E72938635710306F0C259B8C7388297 89255~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~EF1FC9FC6AB9DA5733559B0AD59297C7DC4629C7 92741~|~1~|~1~|~01/NHS~|~Placement of concrete barriers for rockfall hazard funded by GSM program. ATH 33 9.10-9.25. 80% Federal and 20% State.~|~17 - Construction Engineering~|~5E02BE39F0F1DB97DA8F0D1D6505101E9245436E 96310~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation on 6004148 MUS SR93 15.19~|~13 - Bridge Rehabilitation~|~75605A79CD6BA86737C9A9FEA9960115401BD697 122162~|~1~|~1~|~01/S5K/MVER~|~SRTS - sidewalks in the City of Mount Vernon / Knox County.~|~28 - Facilities for Pedestrians & Bicycles~|~8C032E87B77D9B3C503C69008B95C4C5F7248CFF 122162~|~1~|~2~|~02/NFP/MVER~|~SRTS - sidewalks in the City of Mount Vernon / Knox County.~|~17 - Construction Engineering~|~159B50539DA3AB780B94C1D8603C2160B32ABDCC 104428~|~1~|~1~|~01/SAF~|~plan split~|~21 - Safety~|~650699C0DF662E478F53A4FB61C3FD1B23A652EC 104428~|~1~|~2~|~02/SAF~|~100% local funded items~|~21 - Safety~|~C73915783C3AB75CF584DEB544B3C6CF5B2DF3A6 121102~|~1~|~1~|~01/IMS~|~Construction~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~92D0814830FADFE46ADEC61C5A819552C7FC3485 100656~|~1~|~1~|~01/S>2~|~Plan Slit for the seciosn with the large urbanized area on GRE-380. This is between SLM 6.38-6.93~|~99 - State Preventative Maintenance~|~151359A08316F1245A708A47A19398BB4BB73696 100656~|~1~|~2~|~02/STR~|~Plan Split for the rural portions of GRE-380 between SLM 0-6.38~|~99 - State Preventative Maintenance~|~6E2510F33E42C4007B01347727F87C0F5B0D6CD2 115351~|~1~|~1~|~01/MPO/CLIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2EDA66AD927C27DB0DAB6240C7D1112CA055E2F2 101384~|~1~|~1~|~01/NFP~|~Tree removal/pruning District 8.~|~~|~F422472582D9CB62EC119ECA1A82284666743958 85279~|~1~|~1~|~01/CMQ~|~Construction of a roundabout at Mathews/Sheridan Road intersection~|~04 - Reconstruction - No Added Capacity~|~C379E60E10827C9A3FFBBC79573EA6CD7C3B564E 85279~|~1~|~2~|~02/ENH~|~Landscaping and decorative component of roundabout.~|~31 - Landscaping & Other Scenic Beautification~|~E55376185AA00EF6B0AA8D177E56E099A21F7A89 83852~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7 (100% State) - Annual contract for placement of Fast Dry Striping within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F9418A08DC4F397784CDD26A08246D6798E35A2A 104148~|~1~|~1~|~01/NFP~|~Guardrail~|~44 - Other~|~20F26F4CAE3DA0AF2F72C89AE24177D307263E37 122330~|~1~|~1~|~01/STR~|~Replace bridge carrying SR 39 over Friday Creek.~|~04 - Reconstruction - No Added Capacity~|~6881382DF47FEFF111C90C2E9C691FD7568060B8 96274~|~1~|~1~|~01/IMS~|~District Allocation 90/10 - Bridge Sealing - IR 71 Structures in Richland County.~|~47 - Bridge Preventive Maintenance~|~1F2C1D8E1E9FE0179AC5EDDD6143FD60E6CEB977 98386~|~1~|~3~|~03/STR~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~A94501BC93E88E597FF67D276EEB9B895B7A0DF1 98386~|~1~|~4~|~04/STR~|~See linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~B7B9199270FCCB54AD8AEA755DA9ADD04F198339 98386~|~1~|~5~|~05/NHS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~B1EA78C0FB699316030D4A92459544AD0B567C3C 98386~|~1~|~6~|~06/S>2~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~77DB8CB5C287C40E2C4CCE27EA6F55F0B8D3E313 98386~|~1~|~2~|~02/S>2~|~Resurfacing STA SR 43 from 8.88 to 9.03.~|~05 - 4R Maintenance - Resurfacing~|~FF02314637A3EFA26C6DBAE6EB79243BD5A61564 98386~|~1~|~7~|~07/S>2~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~284D89126EC49A628064AE43864837AAE6D794E1 98386~|~1~|~1~|~01/STR~|~Resurfacing STA SR 43 0.00 to 8.88~|~05 - 4R Maintenance - Resurfacing~|~B6936FFEC953A84D5C34523477E014E1D6986322 98386~|~1~|~8~|~08/SAF~|~Construction of centerline rumble strips.~|~05 - 4R Maintenance - Resurfacing~|~97C82494F54D4D15762624BA688155DEC6AF49B6 86822~|~1~|~1~|~01/NHS~|~Bridge replacement project. GAL 7 1954, SFN 2700484. NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~2C6CC6D31858702C5B27B00CC91EA38C54D3C45D 96286~|~1~|~1~|~01/STR~|~Brdg Replacement3602672 SR134 14.43~|~10 - Bridge Replacement~|~DBE7FDFFD5B15C7CDE7C62CC00C74DC01138F19A 86771~|~1~|~1~|~01/NFP~|~D11 Roof Replacement~|~17 - Construction Engineering~|~08851CA2701CC6133129B88786740DB6A3F49C83 109131~|~1~|~1~|~01/NFP~|~Split for bridge maintenance work - non-federal~|~47 - Bridge Preventive Maintenance~|~73E84DD777D311C194F9AF58BFC4E2AA02B5A1EC 123634~|~1~|~1~|~01/STR~|~Plan Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~2C8B3CC6A005437C56858B957E4CCF79BC98CC50 102908~|~1~|~2~|~02/S5K~|~WIL-34 from SLM 14.385 to 15.72~|~05 - 4R Maintenance - Resurfacing~|~F7744C3020221A9160C22816D83CE47A0EA7E22A 102908~|~1~|~1~|~01/STR~|~WIL-34 from SLM 13.28 to 14.385 and WIL-191~|~05 - 4R Maintenance - Resurfacing~|~A6F14DEBF853CBD5CF249E10E6BD6C42E087ABB3 107230~|~1~|~1~|~01/IMS~|~Split for interstate lighting upgrade work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B3F6B39BD77F7A78076B3F139752FC2FEA2E9B1 107230~|~1~|~2~|~02/NHS~|~Split for NHS freeway lighting upgrade~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~52E267C0B0ACA8FA07DBD34442D7F6290C0AF6AD 100465~|~1~|~1~|~01/NHS~|~Gap project to repair composite and flexible pavement joints on LAW 52 18.00-22.16 and LAW 7 0.00-0.20.~|~17 - Construction Engineering~|~E579C22F045C06211060B75F5A2575E61835CC57 100465~|~1~|~2~|~02/SAF~|~LAW 52 18.00-22.16 Safety funding to add microsurfacing to multiple locations along route.~|~05 - 4R Maintenance - Resurfacing~|~44E9657025B13040D6A3772DEB423F701A92388B 123547~|~1~|~1~|~01/NFP~|~D09 DS FY2030 ~|~47 - Bridge Preventive Maintenance~|~F1CAE822683AB1B1952AED5C0E555BCCF6C99CB4 93203~|~1~|~1~|~01/NHS~|~Crack sealing with partial depth repairs to be performed at the approaches to the signalized intersections as needed from the CSX Bridge (MOT SR 49 2.77) to Salem Avenue (SLM 5.26)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5AE53E0C05A599387FC741ECF1C830F6F643C122 123250~|~1~|~1~|~01/S5K~|~Traffic Signal Maintenance~|~21 - Safety~|~648A9698FEA3196A37E0790624B2E3F86EC5FF3C 123250~|~1~|~2~|~02/NHS~|~Traffic signal replacement.~|~21 - Safety~|~384777FA0E775977A8401D387E1A6D39516F4BA6 121015~|~1~|~1~|~01/STR~|~plan split to program project.~|~47 - Bridge Preventive Maintenance~|~E340FFEBE690E86BA4200D465F33C334E95A2476 107648~|~1~|~1~|~01/NHS~|~Rehabilitate structures JEF-7-2059 & JEF-7-2084. Replace superstructure for bridge JEF-7-2059 (SFN 4101111), rehabilitate abutments by replacing slab seat. Replace deck on existing continuous steel beam bridge JEF-7-2084 (SFN 4101146) and convert abutments to semi-integral.~|~13 - Bridge Rehabilitation~|~0A1466C7AF36F2B93003B2591DF647ED4A67477A 107648~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~ECD7C4300CD4C0EE131E6BEDFF4CBD7451B32464 97632~|~1~|~1~|~01/NFA~|~Replacement of SFN 7842597 TRU County Line Turnpike Road (TR-204) bridge over Dead Branch and bring up to current design standards.~|~10 - Bridge Replacement~|~3E17BA563B78BD69E52484EB65C154DEB6E4842D 101371~|~1~|~1~|~01/IMS~|~Clean expansion joints, beam seats, and drainage systems for numerous priority route bridges in Hamilton County.~|~13 - Bridge Rehabilitation~|~7E72389D7AD964979C72820A23D05C8A2AC72DFF 101371~|~1~|~2~|~02/NHS~|~Bridge sealing on NHS routes.~|~13 - Bridge Rehabilitation~|~172F3CA94943819AB5C464CA0C5FF9CD45900B31 101371~|~1~|~3~|~03/S<2~|~Bridge Sealing on urban bridges.~|~13 - Bridge Rehabilitation~|~A04F9281AF9A27BAF3B6A8782B1149770F7C8258 109642~|~1~|~1~|~01/SAF~|~Safety Committee Funds - 4ZHJ7 (90% Federal) / 4BC7 (10% State) -See CAP Comments - Microsurfacing to improve friction performance on Gue- IR 70 from SLM 23.9 to 24.6.~|~21 - Safety~|~002BFB0FAC0551277127062A092140B94F53FAC3 120497~|~1~|~1~|~01/NHS~|~Repair Bridge Hit~|~13 - Bridge Rehabilitation~|~70B4C302632C31DAC379E76652928435162589CD 112085~|~1~|~1~|~01/NFA~|~Replace structure > 20' span.~|~10 - Bridge Replacement~|~6F17C94446A3391EB6364FF368AEC2DED495F0CE 92145~|~1~|~2~|~02/S>2~|~80/20 fund split for bridge using federal STP funds: 4301684, 4301714, 4301803, 4301838~|~13 - Bridge Rehabilitation~|~2C76D6E3A02E58B392D8834C14B0DD3BB46D182B 92145~|~1~|~3~|~03/NHS~|~80/20 fund split for bridge using federal NH funds: 4301382, westbound SR-2 over SR-283.~|~13 - Bridge Rehabilitation~|~7E013E0B2BE3F87062DC6CA10865085626B6EF25 92145~|~1~|~1~|~01/BRO~|~80/20 funding split for federal BR eligible structures: 4301412, 4301471, 4301447, 4301536, 4301501, 4301595, 4301560, 4301897, 4301927.~|~13 - Bridge Rehabilitation~|~9C63352F7EA66D445A78646DF7645ADBE9D88805 86321~|~1~|~1~|~01/MPO~|~Construct a bikepath along the East side of Steve Whalen Blvd, complete the curb and sidewalk along the West side of the street including ADA compliant ramps.~|~28 - Facilities for Pedestrians & Bicycles~|~067A2E7DDD520ACA2D1226246497659AEBA37697 100375~|~1~|~1~|~01/STR~|~Various routes.~|~05 - 4R Maintenance - Resurfacing~|~849C45387C62834C655CD0C9ED52F0A9DA919238 23051~|~1~|~2~|~02/S>2~|~All work on the STP system, basically the ramps from SR-237 and SR-17.~|~04 - Reconstruction - No Added Capacity~|~80C21FD8BF1CA35A09E26F341DF0AD5CC3F53203 23051~|~1~|~1~|~01/NHS~|~All work done on the NHS system from Snow Rd to SR-17.~|~04 - Reconstruction - No Added Capacity~|~DADE4B3C11CB1AD12DF5424C38BE592F5D8C5A38 100455~|~1~|~1~|~01/SAF~|~Reconstruction of six traffic signals, installation of a new traffic surveillance camera, addition of street lights to the traffic signal poles where necessary fiber optic cable and splices will be replaced and installed underground.~|~21 - Safety~|~7009453A412059F076E6EFC29CB7380074B7BD69 109029~|~1~|~1~|~01/ENH~|~Sidewalk Project~|~28 - Facilities for Pedestrians & Bicycles~|~FE78CC5CB948E47EFC9C60E389F9FCCC18DA4535 126920~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~3C42EEFF34898156FFD74CF0F59EEAAC27AD1329 116697~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~47388FC6774C03B9D9C5DC540C70B19E22829052 123507~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DBD8BD5E8823B63135161233B459D8ACD102CA4A 126291~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~7DB5AEEEF4C2ED08206EC755535580FCA560A20E 99626~|~1~|~1~|~01/SAF~|~Along State Route 164 add a SB auxilary lane South of the interchange to just South of the State Route 626 intersection; addition of a southbound LTL on State Route 164 at the State Route 626 south junction; conversion of the State Route 626 North junction to a multilane roundabout; Beaver Township, Mahoning County, Ohio.~|~~|~1E35E5C9E85C581246C367E07DA062154479F80A 99626~|~1~|~2~|~02/IMS~|~Widening and replacement of SR-164 structure (SFN#5029783) over the Ohio Turnpike, Beaver Township, Mahoning County, Ohio.~|~~|~4BECF4151BE5F3F5BBFEB873E76FF96C684560D6 97952~|~1~|~1~|~01/STR~|~SR 559 SLM 7.36 to SLM 11.81 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in).~|~05 - 4R Maintenance - Resurfacing~|~489B29F087FF5580E100EA27BB8AE1AFD0F94FC4 97952~|~1~|~2~|~02/NFA~|~SR 559 SLM 12.01 to SLM 12.62 (ZR 000) - resurface the exisiting roadway with asphalt concrete (2.00 in)~|~05 - 4R Maintenance - Resurfacing~|~89FADE01EB1CA7ABAE270D71F694398000E19328 102410~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~9521ED5C56087404198D204226DA3BA75D485642 84557~|~1~|~2~|~02/IMS~|~This split is for work to modify the interchange ramps.~|~04 - Reconstruction - No Added Capacity~|~31B5231787814BEE732E1DFFE583C5A6E384F2A0 84557~|~1~|~4~|~04/NHS~|~Work on US 224 outside the 400 feet of approach work by the bridge. No local funds.~|~04 - Reconstruction - No Added Capacity~|~687B93CED6DF9F185DB1CB8C1BFC11CE0CAA941D 84557~|~1~|~3~|~03/ENH~|~This split is for work for Transportation Enhancement (TE) eligible activities including the construction of sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~B4FF7A96767CA0EBDF672F177C8C716ED0E5A4E5 84557~|~1~|~1~|~01/BRO~|~This Split is for work to replace the bridge including approach work of up to 400 feet in each direction. Work done under this split is eligible for federal BR funds.~|~13 - Bridge Rehabilitation~|~CC5799DEA34CFBCD42C9418AE9A68A8D1CED3C70 101872~|~1~|~1~|~01/NHS~|~NHS Bridges~|~13 - Bridge Rehabilitation~|~56095DEDEF9339AF129BABDB6873E3C905217D9A 101872~|~1~|~2~|~02/STR~|~Major Collector and Minor Arterial bridges.~|~13 - Bridge Rehabilitation~|~5BA08F751A3215C931F50664A9D91AA7C1461C37 79366~|~1~|~2~|~02/NFA~|~Three sided culvert on Meeker Way over Dry Run Branch~|~21 - Safety~|~A781752E4B1E5490C9787654395DCDF39DA3DFC7 79366~|~1~|~1~|~01/SAF~|~Work on SR 315/US 23 and Stratford Rd US 23 intersections. Construction of Meeker Way. All work except culvert under Meeker Way.~|~21 - Safety~|~0F83A012E1AFCF95FEBD6963C14D3A44B9D81848 83644~|~1~|~1~|~01/STR~|~80/20 funding split for the RURAL portion of the project using federal STP funds. This section is the first 0.59 miles of the project.~|~05 - 4R Maintenance - Resurfacing~|~13E798548657158767B74DBAE3AFFD45B656FC84 83644~|~1~|~2~|~02/S>2~|~80/20 funding split for the URBAN portion of the project unsing federal STP funds. This split will be used for all work after the first 0.59 miles.~|~05 - 4R Maintenance - Resurfacing~|~D9A9BF4EE779981A61405BF84523260EAC5F1B1C 122176~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-70-A- MOT~|~~|~08200DECD58BE80E5891E1768018F7A465DB434B 126776~|~1~|~1~|~01/IMS~|~Noise Wall.~|~20 - Environmental Only~|~E868AE246D4385EFEF4C48B8F886B57AAA676F08 118625~|~1~|~1~|~01/NHS~|~Plan Split 01/NHS/PV~|~05 - 4R Maintenance - Resurfacing~|~433956728FE9ACD26F538DA9A469E23FC2AC9F50 104942~|~1~|~1~|~01/MPO~|~Retrofit existing traffic signal heads at 26 signalized intersections within the City of Reading, OH with LED signal heads. Existing pedestrian heads will be retrofitted with LED lenses. Existing school flashers will be replaced. Battery backup systems will be installed at six intersections.~|~21 - Safety~|~27DFFC59E434E86DF06A72DB673DA61E077091C1 104942~|~1~|~2~|~02/SAF~|~Items to be paid by the Local - City of Reading.~|~21 - Safety~|~6120E72F63E82D01EAB4A1D9D06023B5B50857B0 93954~|~1~|~1~|~01/S<2~|~City of Bryan SR-2 and SR-34 (High St) from Town Line Rd to CR1575.~|~05 - 4R Maintenance - Resurfacing~|~3F416389D17BB391860F7ABE618EC92A8CFD601B 121544~|~1~|~1~|~01/IMS~|~Block PID for resurfacing interstate ramps.~|~~|~8A7748E99AD5BF626C8931854F9964EB1BDAF066 116274~|~1~|~1~|~01/S5K~|~Sidewalk repair with ADA upgrades on ATH 682 4.70-6.18.~|~28 - Facilities for Pedestrians & Bicycles~|~96813DBFB020876CDF16985ADA33FED65F512AF8 116274~|~1~|~2~|~02/SAF~|~Addition of 3 RRFB's to be added to ATH 682 in The Plains. Work locations include 4th Street, Elm Street and Pine Street. Safety Funded 100% Federal.~|~21 - Safety~|~2003364036839925A1F1735182DA3C2864E431BA 103062~|~1~|~1~|~01/NHS~|~Mill and resurfacing of Airport Access Road~|~05 - 4R Maintenance - Resurfacing~|~06DD0CDB51A02AD1297284C5C95897F985FB1C39 103062~|~1~|~2~|~02/NHS~|~Bridge rehab on SB airport access road bridge~|~13 - Bridge Rehabilitation~|~A4CDB2AAB2CD5005E3346DF18543EFCC28415820 93597~|~1~|~2~|~02/S>2~|~Remove and replace pipe, headwall, and the removal of catch basins and manhole on State Route 725 at the intersection of Union Road SLM 10.11.~|~~|~8B21914BC67D3D6805F7807C25B3DA899603A8DB 93597~|~1~|~1~|~01/IMS~|~Repair of medin catch basins along Interstate 75 from milepost 49.7 to Milepost 51.3 (SLM 8.78 to 10.38)~|~~|~EAB31E8C697E98074DE301AA2395A3DE54C31379 99480~|~1~|~1~|~01/STR~|~JAC 327 SLM 0.00 to 6.08~|~05 - 4R Maintenance - Resurfacing~|~559FEFA0B5319630B6DA0922171AFCAD103FD79A 99480~|~1~|~2~|~02/STR~|~JAC SR 327 (0.00 to 6.08)SFN 4003306 (0.77)SFN 4003330 (1.73)SFN 4003357 (3.82)~|~13 - Bridge Rehabilitation~|~77CE9BC2D5DEC27BCF5CAB638FD880EDDF49F862 124300~|~1~|~1~|~01/S>2~|~Reconstruct roadway & add pedestrian path~|~21 - Safety~|~29E3008202FF588F0B89FD5E1053563C3EA93284 92499~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement project~|~21 - Safety~|~04760331D0EEF192855B4EFBB860149AA3DD897C 104496~|~1~|~1~|~01/MPO~|~plan split~|~04 - Reconstruction - No Added Capacity~|~60B200E75964428C756F5F8B48968BE0A842129F 123622~|~1~|~1~|~01/STR~|~Plant Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~48851B650FB1D8A1046EBE662D4D259567F3B4BB 118999~|~1~|~1~|~01/BRF/MACE~|~Bridge replacement.~|~10 - Bridge Replacement~|~4409BD24C7EEED1E43D6F8230A428D961ED6490B 112572~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items in construction and CE using 4TA7 (NOACA) funds~|~05 - 4R Maintenance - Resurfacing~|~3FEEF76DA60C99D343F90C2E590622759528B6A4 103160~|~1~|~1~|~01/S>2~|~Reconstruction and enhancement of portion of SR 571 in Tipp City.~|~28 - Facilities for Pedestrians & Bicycles~|~CDA6199579F3EA932045D6D1A2C34161F1CF034C 91565~|~1~|~1~|~01/BRF~|~80/20 funding split for bridge work eligible for federal local bridge funds.~|~13 - Bridge Rehabilitation~|~5784A3F96688D2C2C140014CF8476FB3ECF6E479 77442~|~1~|~1~|~01/NHS~|~Resurfacing/Pavement Prmy Sys/Bridge Maintenance/Guardrail~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2524A0CD9DECE060932CD0EF9AD3DEE342556537 77525~|~1~|~1~|~01/NHS~|~Plane and PaveCRA-030-09.53 to RIC-030-04.07~|~05 - 4R Maintenance - Resurfacing~|~0DA838979AEB5574AFDB7E57EDA1A4FF301A03C1 77525~|~1~|~2~|~02/NHS~|~Pavement marking - 100% 4MP7 (State pavement marking funds)~|~21 - Safety~|~1DD6252992546E19B67253C2ADE0499E2C2269BC 102345~|~1~|~1~|~01/STR~|~Test pavement sections on VIN 50 3.00.~|~05 - 4R Maintenance - Resurfacing~|~610B73ED1EAACCCBC0B1DCF7D22700DDE69AF90B 105128~|~1~|~1~|~01/NFA~|~Construct an industrial access road of two 12-ft. lanes from Commerce Drive to the south an estimated 1800 LF within the alignment of an existing narrow, old mostly gravel road.~|~~|~7C8F6D04C7C7344158E0DA0A63E22FDC1605B1E2 82134~|~1~|~1~|~01/NHS~|~Phase 3 of the reconstruction of the IR275/SR32 interchange. Primarily westbound ramps from SR32 from Eastgate Blvd and to IR275.~|~04 - Reconstruction - No Added Capacity~|~7647312642641FF60228DCDE5661DE65C9C1ADE6 107918~|~1~|~2~|~02/IMS~|~Interstate Plan Split: FRA-270~|~05 - 4R Maintenance - Resurfacing~|~48245E904EC63DDEE60A3283C2A56232504A0FFF 107918~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~A102C653F10E47DE77C9BB60F1CE8580E3319CC2 107918~|~1~|~3~|~03/S<2~|~Urban Area (STP<200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~77FB083568E79002924C5E71A3BB4AC2E9519AA8 107918~|~1~|~4~|~04/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~474954678DB6B4E51685291009F1325AD4267706 107918~|~1~|~5~|~05/S>2~|~Urban Area (STP>200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~BFFB50BF17B8CF7AE8AA0062786D0F743A1ECB4C 109850~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster Large City Funds with TRC - 4TA7 (Federal 80%) /LNTP(TRC15%) / LNTP (Local 5% ) - No CAP - Resurfacing with related work on Fai-CR 54-04.90 East Fair Avenue~|~05 - 4R Maintenance - Resurfacing~|~B381A8607EAC460B9397444D16FCD29CCBC4D4DF 125802~|~1~|~1~|~01/NFA~|~Paving Resurfacing MRG SR 669-5.621~|~05 - 4R Maintenance - Resurfacing~|~27E5B51BC1E09CE0CF21CF2DF73A0F33872273C2 125802~|~1~|~2~|~02/STR~|~Paving Resurfacing MRG SR 669 & 555~|~05 - 4R Maintenance - Resurfacing~|~DA1556AF65FE7CEAE59E01447390823738440597 125381~|~1~|~1~|~01/NFP~|~Mowing.~|~44 - Other~|~EBEF8E11CE1AD726BC199244CD6299E126F5436E 100941~|~1~|~1~|~01/BRF~|~SFN 8753164~|~10 - Bridge Replacement~|~2C2A2FA1ED48A5F9ADA0369913EE6292540DE64E 79974~|~1~|~2~|~02/STR~|~CO CC Rural plan split. All brdgs are pave thru.US35 10.20 - 13.77002/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~9C4E683740D475930957B2F488149866043846C7 79974~|~1~|~1~|~01/S<2~|~CO CC 01 Urban plan split. All brdgs are pave thru.US 35 13.770 - 14.4101/S<2/PV/State~|~~|~AF7211EF4B171D7FF5BF385D34003D75C779ECAE 114954~|~1~|~1~|~01/STR~|~Bridge Replacement~|~04 - Reconstruction - No Added Capacity~|~68FDDF84F0B398D1A2827D92008A0DCCCF6AED73 89180~|~1~|~1~|~01/MPO~|~ Project involves the addition of a left turn lane and bike path for 1.25 miles on Kings Island Drive: from 500' S of the Brandt Connector to 500' N of the north entrance to Kings Island Theme Park. In addition, existing traffic signals will be upgraded and interconnected, and signs and pavement markings will be replaced to better define lane utilization.~|~21 - Safety~|~D38EBEB2C2FD2F67597F827696407402F1D75168 98008~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~35AE30BBC2CEB26680EE9C0A57B668C5D84AB00E 118812~|~1~|~2~|~02/CMQ~|~Construction of sidewalks, curbs, and gutters. CMAQ eligible work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~80D5964676867BB9E6B4F7F3871B0EA9B835A051 118812~|~1~|~1~|~01/S50~|~Resurfacing work on Robb Avenue~|~05 - 4R Maintenance - Resurfacing~|~0897BE50403AE8D8B81BCF0C668C03E0E8925982 101066~|~1~|~2~|~02/S<2~|~Overlay various routes with fine graded aggregate: CHP SR 54 SLM 10.29 to 10.66~|~05 - 4R Maintenance - Resurfacing~|~2993A051ECE3B9A5B891B6780718BF15E03C5E42 101066~|~1~|~1~|~01/STR~|~Overlay various routes with fine graded aggregate: CHP US 36 SLM 19.48 to 22.33 = = CHP SR 54 SLM 8.28 to 10.29 = = CHP SR 245 SLM 17.06 to 20.02 = = CLA SR 41 SLM 28.45 to 31.28.~|~05 - 4R Maintenance - Resurfacing~|~9C80DB9CA76F58792385BBD126A16455A2E43DA9 104835~|~1~|~1~|~01/STR~|~Resurfacing project using 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7 from the District Preservation Program budget. There are no local funds.~|~05 - 4R Maintenance - Resurfacing~|~8A544802C26595D48477A2419163AB549874939A 90188~|~1~|~2~|~02/MPO/WFar~|~Relocation/replacement of West Farmington waterline.~|~43 - Utilities~|~5C17D24117BE9D42DD9AC910E481B3960C02703E 90188~|~1~|~1~|~01/BRO~|~BR Eligible: replacement of SFN 7807597 18.87 SR534 over flow grand river. SFN 7807627 18.92 SR534 over grand river.~|~10 - Bridge Replacement~|~71756B516961813BBA75F085E2338B400BF2C58F 102033~|~1~|~1~|~01/NHS~|~Intersection of Monroe and Talmadge~|~21 - Safety~|~DD5A817D86C909BEF7258318B3225374EAFF1EC5 97243~|~1~|~2~|~02/S<2~|~PIK SR 552 0.00 to 1.75~|~17 - Construction Engineering~|~073CCE37B7F59919428BDD0E3B1BD06A813FCD19 97243~|~1~|~1~|~01/S<2~|~PIK SR 552 0.50 & 0.59~|~04 - Reconstruction - No Added Capacity~|~51B95C09AC7C2A4200520372BB1C26A5526D5C5A 124695~|~1~|~1~|~01/STR~|~Bridge replacement. ~|~04 - Reconstruction - No Added Capacity~|~9FA35C31F8485482DD210E6A626F3EC6B4D9F06B 123544~|~1~|~1~|~01/NFP~|~added plan split for PM B~|~21 - Safety~|~74F2309DC2FC67E14EC0E9D95808B263F4B2430F 108635~|~1~|~1~|~01/NFP~|~The current manufacturing facility is located on Hickory Street and expansion plans would require the Village to upgrade the existing sanitary, storm sewer and roadway systems that currently service the facility from Clay Street. Additionally the Village will be required to widen of US 33 inside the Village limits to provide for safe semi-truck turning movements at new access points into the plant from US 33~|~01 - New Construction~|~73BAD5A93320E54CF6EA166FB06FEE12B88FB52E 108635~|~1~|~2~|~02/NFA~|~N/A~|~44 - Other~|~146873A45651CED6DB579F90DDB1B02973344CF6 113111~|~1~|~1~|~01/STR~|~On CR 44 pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program and 100% (LNTP) Local funds.~|~05 - 4R Maintenance - Resurfacing~|~E346A2B7262D3D07A398F9AD0BD063FA4F3FC5A8 120814~|~1~|~1~|~01/NHS~|~Culvert Maintenance. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6616A033B0504BAC7CAEE3C7AA4B65B892173437 112571~|~1~|~1~|~01/SAF~|~Signal plans split~|~21 - Safety~|~154EF67AF0839B0DAC07CA7B30AC6FC35FBEEAC1 120700~|~1~|~1~|~01/NHS~|~Smooth Seal.~|~05 - 4R Maintenance - Resurfacing~|~45E106506994886ADC535725E9341AB9FA1C7CC5 92319~|~1~|~1~|~01/NFP~|~Facilities~|~44 - Other~|~2D519C9B71BC916A0B5065ACF4D345EEFBF076BC 107399~|~1~|~1~|~01/S5K/ZANE~|~Resurfacing with related work on MUS-666 in city of Zanesville~|~05 - 4R Maintenance - Resurfacing~|~E85061CE843DB822C17A92778140FA16CD95157E 107399~|~1~|~3~|~03/S5K~|~Major Rehabilitation Funding (5MT7/4MT7) of Mus-SR 666-2.019 to 4.854~|~04 - Reconstruction - No Added Capacity~|~92BF4C1C2294E9B11D102DAAB5927E37AC76FEF6 107399~|~1~|~4~|~04/NFA~|~Major Rehabilitation Funding (4MT7) FDR treatment on MUS-666-4.854 to 14.165~|~04 - Reconstruction - No Added Capacity~|~519BD6833F7D24A6E2BC894C5A5E1F6DEF36884E 107399~|~2~|~5~|~05/S5K~|~Replacement of MUS SR 666 3.58 (SFN 6006485)~|~10 - Bridge Replacement~|~0ADDC3A7DFC64D37236F54DA8EE692494DFEDDE6 107399~|~1~|~2~|~02/S5K~|~Resurfacing with related work outside of city and major rehab limits.~|~05 - 4R Maintenance - Resurfacing~|~788741D82B80D3455C9C4AE68209CC513E8BFEF7 107399~|~1~|~6~|~06/SAF/ZANE~|~Replacement of curb ramps and guardrail within city of Zanesville.~|~21 - Safety~|~4835BC75F98F03F4F70BC55889D26E2E941EEA85 121287~|~1~|~1~|~01/MPO/SUCE~|~Install new roundabout.~|~04 - Reconstruction - No Added Capacity~|~82A156F8BC2D2E144A38844E387D6FB3073B4AFC 98275~|~1~|~1~|~01/NHS~|~NHS Non-Interstate~|~44 - Other~|~569ED3359D59148014AAD9D93C03AED34E8439E0 103482~|~1~|~1~|~01/BRO~|~Work eligible for Municipal Bridge funding for the rehabilitation of E. 116th Street bridge over GCRTA tracks.~|~13 - Bridge Rehabilitation~|~19EBA66ADF1F2806FEE8DA2120D161C71C0D9108 117706~|~1~|~1~|~01/BRO~|~District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~F8F45A5EC47C74C42195CE8921675A38CC944247 104684~|~1~|~1~|~01/BRO~|~Bridge replacement project using 95% Municipal Bridge/5% Local; 95% 4R87/5% LNTP.~|~10 - Bridge Replacement~|~CE988845F7A4D98B1F821A341303A2D4F1860441 121626~|~1~|~1~|~01/S>2~|~Reconstruct roadway & improve bike / pedestrian facilities~|~04 - Reconstruction - No Added Capacity~|~4FB6BDBF71377DC834C38F42D81F98A0F5AFF63D 102292~|~1~|~2~|~02/NHS~|~Resurfacing SR 7 within the City of Columbiana including asphalt overlay and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~37D5FF591E7D454E8F0A79353CFE22E98AB77F8F 102292~|~1~|~1~|~01/NHS~|~All work associated with the asphalt resurfacing of SR 7 outside of the corporation limits of the City of Columbiana.~|~05 - 4R Maintenance - Resurfacing~|~5E3B2A7786C2DD68EC9A19F5B65790DF28AC2E7D 102292~|~1~|~5~|~05/S<2~|~Asphalt resurfacing work on SR 14 from SLM 8.72 (bridge) to the corporation limit at SLM 8.89.~|~05 - 4R Maintenance - Resurfacing~|~04E05A17085B7FDCF758283B52C0D990FCBF9150 102292~|~1~|~3~|~03/S<2~|~Resurfacing SR 14 (excluding SLM 8.72 to 8.89), SR 46 and SR 164 within the City of Columbiana including asphalt overlay and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~43BC08812FC324E15EE892FDF7624C7C8EC40DE2 102292~|~1~|~4~|~04/S<2~|~Work associated with new curb ramps and auxiliary pavement markings to be paid 100% by the City of Columbiana.~|~05 - 4R Maintenance - Resurfacing~|~EDC09660C4A0784E99A8C8CDE4F44450E2957DEA 85349~|~1~|~1~|~01/ENH/ZANE~|~"01/ENH/OT/ZANE" - Enhancement Funding 4B37 (80% Federal) / 4BG7 (20% Local) - CAP 4B37 of $1,000,000.00 Federal - City of Zanesville Enhancement Project which includes new curbs and sidewalks, installation of utility trench for street light wiring, installation of decorative street lights and installation of new curb ramps.~|~28 - Facilities for Pedestrians & Bicycles~|~00337BA56CE75CBE52319B76190A188E35C9C700 85349~|~2~|~2~|~02/S<2/ZANE~|~"02/S<2/PV/ZANE" - Local Funding City of Zanesville STP funds 4TA7/ZA05 (80% Federal) / 4BG7 (20% Local) - No CAP - Resurfacing of Fifth Street Mus-CR 2020-00.00 to 00.50 (IR 70 Exit 154 off ramp to South Street)~|~28 - Facilities for Pedestrians & Bicycles~|~DEB0CA11C6F41808B55F43FF9989512FEDA40507 110888~|~1~|~1~|~01/BRF~|~Replace superstructure on bridge carrying SR 542 over Hump Run.~|~13 - Bridge Rehabilitation~|~A358FE0013A655C78E63B2B1A674D2F6798C3377 125673~|~1~|~1~|~01/IMS~|~Plan split for resurfacing I-75. ~|~05 - 4R Maintenance - Resurfacing~|~169BE2C3D06E9ACB7796A43FAA587A822F72E8DD 99384~|~1~|~1~|~01/NHS~|~L & B - MINOR NEW CONSTRUCT Funding LBP7 (100% State) - Construction of a pole building for a salt storage building at the existing Utica outpost.~|~44 - Other~|~B8EACAD1D602A2A81C099E9E69A712729CE5E3F8 104927~|~1~|~1~|~01/NFA~|~Johnson Trucking truck replacement project~|~44 - Other~|~919AF42EAA5530823F49225F9F1581276CD1CED3 102836~|~1~|~1~|~01/NHS~|~Micro surfacing NHS Routes~|~05 - 4R Maintenance - Resurfacing~|~3D64C78448AA286647AE4A3A4E6E7837A8234FBC 102836~|~1~|~2~|~02/S>2~|~Micro surfacing STP > 200k routes~|~05 - 4R Maintenance - Resurfacing~|~9951BD2FF3265D53CE6B14FEC7140F792EE68626 102836~|~1~|~3~|~03/STR~|~Micro surfacing STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~C0490B881E148110ABEF40AEDF0D82BA96A3C9FE 103055~|~1~|~1~|~01/S>2~|~Mill and resurfacing of township road.~|~05 - 4R Maintenance - Resurfacing~|~5CB9A029ACEABFA39FF95840EB23BCBCB07DD25A 126397~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~F61B37206538EEB77E0C6D4D9347B9230687CE5C 125990~|~1~|~1~|~01/NFP~|~Annual RPM maintenance plan~|~21 - Safety~|~C439B8C8D7CD3A3B11CE2D72652C2AFD8BE944EB 106597~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - Knox County Engineer project to replace bridge Kno-TR401-1.35 (SFN 4237048) using Federal/State Exchange Program with state max of $1,903,373 funded at 95%~|~10 - Bridge Replacement~|~BC02379739C83C9C709C3B5BB4083CB57B783D1F 105391~|~1~|~1~|~01/STR~|~Smooth seal on rural route: SHE SR 29 SLM 22.37 to 26.23~|~05 - 4R Maintenance - Resurfacing~|~837138BE8E21A411060236C96475F4DAEDB12209 96285~|~1~|~1~|~01/STR~|~Bridge replacement 4402529 LAW SR -141 12.870 198.0 ~|~10 - Bridge Replacement~|~4D9CCFF119874E67FDBB44A6795D5DCA9044D631 91841~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on COL-170 and COL-165; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~447F28AF5AD5ADBA3BACF075E23E4F783CF4EE5C 81710~|~1~|~1~|~01/NHS~|~BRO SR32 5.28 - 8.15 & 8.15 - 11.34, & HIG 0.00 - 0.39 ResurfacingOn SR32, begin project 0.36 miles east of the US68 ramp (SLM5.80), head west and terminate at it's intersection with SR134 (SLM 11.34). Project includes HIG SR32 0.00 - 0.39. It is proposed to maintaine & preserve the pavement by making the necessary repairs & by overlaying the existing pavement w/asphalt concrete.80/20 split~|~05 - 4R Maintenance - Resurfacing~|~C597928956167B355EA750627B5BA89163E1AFB3 103057~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 724 1.44.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~399BF9D6A350972C39C5179CFBF57C88493AD6B1 98302~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair contract~|~44 - Other~|~FB79D3922C84F3A37A09C4AF65A0F102A3C8CBD1 105778~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid~|~13 - Bridge Rehabilitation~|~10586DD85567F097F134BE18CC38CD7C11914F09 87668~|~1~|~1~|~01/NHS~|~Enbankment slide repair of Lightner Rd bridge over SR-2 in Ottawa County @ SLM 26.35.~|~44 - Other~|~3A53488EE5FBC4B6720BB9C7B55C5180D7FCC964 93199~|~1~|~1~|~01/STR~|~General system paving of MRW-314: 4.02-20.02~|~05 - 4R Maintenance - Resurfacing~|~7AF3B9927EB474F42AFCDA8C8D853129E92950FF 119840~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 22 0.00-2.99. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~C2FD75343A9176E06CDD29739F22810679F68312 109310~|~1~|~1~|~01/ERD~|~Reconstruction of Erie Street eligible for federal earmark funding~|~04 - Reconstruction - No Added Capacity~|~A9C1ED634C0B42FE01CC591A73012E3EFDAFDEED 77242~|~1~|~1~|~01/IMS~|~LUC IR75 1.99-2.34~|~~|~45FC571EF6621008E122B02C3A80A11735BA530D 77242~|~1~|~2~|~02/BRO~|~4803000 LUC IR75 1.99 Intersect: Nebraska Ave 4803094 LUC IR75 2.34 Intersect: Indiana Ave 4805496 LUC SR246 5.84 Intersect: Ir 75~|~~|~4616FB501CE83FBC0FFEB0111E4E6F7EF88A339A 98347~|~1~|~1~|~01/SAF~|~Lighting project on various routes and sections in D10 for FY2017.~|~21 - Safety~|~3246BAAFB46FF4A152E1723511E9314BF6CF3A24 114302~|~1~|~1~|~01/NHS~|~All the slide repair work is in this project is in this plan split. Federal and state funds from the GSM program. After the GSM cap is reached funds will come from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~675D1662ED50C21E22DB286BF43C7D9D6A6ACA2A 84409~|~1~|~1~|~01/BRO~|~Replace existing supestructure on Bridge No. HAS-519-0220 (SFN 3402878) with new box-beam superstructure~|~13 - Bridge Rehabilitation~|~B07C4E3CBAE928FD1B0C9CB72F618E4EB4853C9C 93528~|~1~|~1~|~01/BRF~|~SFN 6232027 OTT-CR19-4.70~|~10 - Bridge Replacement~|~39325E0DFE9FBA998868FABF4D4294E78B034613 108391~|~1~|~1~|~01/MPO~|~Widening on local road in the City of Huber Heights.~|~03 - Reconstruction - Added Capacity~|~62A9FD75F6E28C809EC7385208181F7F1114E643 111185~|~1~|~1~|~01/STR~|~Replace structure with 10' to 20' span.~|~~|~7EF89A6AC1DF2E6E785FE190BFDE760950EE8687 115177~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~64DCD757DFB702728F535FB9CAB01CB57E7C8CF5 98282~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - plan split 01 for Lic-16-1593L/R~|~~|~DA33BF39534691396001CD90425C9513068FE180 120312~|~1~|~1~|~01/ERD/SUCE~|~Chip seal and pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~00881473F52E0F116C82D624C7DB34A9AAA6786F 99736~|~1~|~1~|~01/SAF~|~Replace and upgrade various guardrail runs in various locations in Darke County.~|~21 - Safety~|~76AF57BFD6005943CD9D291582501BE9380A524F 95451~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities 4MA7/005 (100% State) - No CAP - Construction of new salt dome and pole building at Lic-SR 161-08.45 at the SR 161 & SR 37 Interchange.~|~01 - New Construction~|~2E4C002B82C64156B6B146046FD8A1525D31A2EB 122316~|~1~|~1~|~01/NFA~|~Plan split to program project. Update when scope is complete~|~10 - Bridge Replacement~|~BA2BFFE377CDEAE02DA1FAE91BF46371B5548AC5 96149~|~1~|~1~|~01/NFP~|~Construction of a new 1000 pound salt dome on new property in Butler County.~|~01 - New Construction~|~829FF30308D0820C3D4474F4C76C9B308787EF76 113444~|~1~|~1~|~01/IMS~|~Safety Program - 4HJ7 (100% Federal) - See CAP Comments - application of recessed and wet reflective pavement markings on LIC-70, and MUS-70.~|~21 - Safety~|~9726EDEC6AC03246E99E45DC0BDE4ACC7605F15F 113444~|~1~|~2~|~02/NHS~|~Safety Program - 4HJ7 (100% Federal) - See CAP Comments - application of recessed and wet reflective pavement markings on COS-36.~|~21 - Safety~|~35109A9BCCB0A246C34241BBE9D99FF91B59D375 113444~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~2A1D03FDB787C12A5F8095B9C38106A1EEAE65DD 124069~|~1~|~1~|~01/ENH/STPK~|~Bridge replacement.~|~28 - Facilities for Pedestrians & Bicycles~|~656F58B524245BBA17F0CE396A8665E51C9A01E2 94913~|~1~|~1~|~01/SAF~|~Saefty funding to provide turn lanes and signal improvement on Georgesville at Holt and Automall Drive~|~21 - Safety~|~3E3383206393F2185A2129A27367F582601B5125 106770~|~1~|~1~|~01/SAF~|~install Qwick Kurb~|~~|~055B55C09D98B86FE4478FE7417B9B775E75BF54 104169~|~1~|~1~|~01/IMS~|~Concrete pavement repairs along Interstate 80 between the Ohio Turnpike and State Route 46, Mahoning County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~84C334A6A651583985DA6CC8B63AFE459E9E7422 93929~|~1~|~1~|~01/NFP~|~Pavment Markings (A)~|~21 - Safety~|~39190716DDC6F14DF39A01AD44B2E819801A51E4 119337~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~32B4AA45CAB63A81C230D29DCD34A7FAC488B9EE 102817~|~1~|~1~|~01/STR~|~STP Rural pavement~|~05 - 4R Maintenance - Resurfacing~|~EEF377B505F310B1A862F577F470836CC9986607 102817~|~1~|~2~|~02/STR~|~STP rural bridges~|~13 - Bridge Rehabilitation~|~31D1E838D91FD1A0BE2111B02E51DDCDF00C8EEC 102817~|~1~|~4~|~04/S<2~|~S<2 Bridge Sen 101 1.72~|~13 - Bridge Rehabilitation~|~78FBBC118555CA593040D331DBEF67AEB5403BD3 102817~|~1~|~3~|~03/S<2~|~Sen 101 1.64 to 2.33~|~05 - 4R Maintenance - Resurfacing~|~068AEE7D9F5B2EC9B89BE91278823136B6C2A377 102817~|~1~|~5~|~05/STR~|~Culvert CFN 1843576~|~04 - Reconstruction - No Added Capacity~|~870717B01580415C58690CDDC7F44E6EBFAC87DF 80125~|~1~|~2~|~02/STR~|~Replace existing 3' X 2' X 38' long concrete box with 24" X 55' long conduit, Type A on US 62 at SLM 2.52. Replace existing 3' X 3' X 70' long concrete box with 42" X 64' long conduit, Type A on US 62 at SLM 3.84. Replace existing 4' X 3' X 32' long concrete box with 6' X 4' X 76' long concrete box on SR 60 at SLM 7.63. Replace existing 3' X 3' concrete box on SR 83 in Holmes County at SLM 4.45 with a new 3' X 3' concrete box.~|~04 - Reconstruction - No Added Capacity~|~524A38E7AC06CE9D2CA553493637C3CF9064FF8E 80125~|~1~|~3~|~03/S<2~|~Replace existing 24" X 93' long CMP with 24" X 100' long CMP on COL 154 at SLM 5.62~|~04 - Reconstruction - No Added Capacity~|~95C2990E4427EB234ED674F74286949650919FBD 80125~|~1~|~1~|~01/NFA~|~Replace existing 84" X 72' long sectional plate conduit with an 84" X 80' long conduit, Type A on BEL 26 at SLM 3.76~|~04 - Reconstruction - No Added Capacity~|~CBB83AABA74BAC1C84DECDF5E1F4D91AEC543796 115755~|~1~|~1~|~01/S>2~|~This work will cover all work associated with the new bridge construction~|~~|~53B48E09A7A4D724892F328FF2A14FC606369FFC 115755~|~1~|~2~|~02/S>2~|~This plan split will cover all work associated with roadway improvements and new roadways approaching the new bridge~|~~|~9AD128CF2DB9775379BFD36B92BFD8F36B57C439 124931~|~1~|~1~|~01/NFA~|~Resurfacing project on MRG CR 4 0.00-6.404. Funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~8B10ECA70D182E23851349CE53A1DAE765371B11 117206~|~1~|~1~|~01/S5K~|~Primary plan split for new sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~BBA8E4F713624AEB4ACA7588BC6585ED2EC381B9 97281~|~1~|~1~|~01/SAF~|~FY2018 District wide raised pavement markers.~|~21 - Safety~|~8A53A9D1ECBDAD89EEB99BF9EAC77781C1195AB0 126643~|~1~|~1~|~01/S>2~|~Bridge repairs~|~13 - Bridge Rehabilitation~|~FA62BC2A16934128B652CACEC2E3CD487C198D00 124744~|~1~|~1~|~01/SAF~|~installation of new guardrail and rehab of current guardrail on various county roads~|~21 - Safety~|~62306F64BA03FB7224D6C713F44F684531EFB92C 100050~|~1~|~1~|~01/NFP~|~Split for all work associated with the bridge repair~|~44 - Other~|~9879BB1BDBDA829167BB35853FF003143943C6BB 125437~|~1~|~1~|~01/NHS~|~Culvert liner project. MEG 32 2.61, SFN 5300533.~|~04 - Reconstruction - No Added Capacity~|~DE976BF8D7830EE1BC84F62E0AE8CD77F10EBF65 104657~|~1~|~1~|~01/MPO~|~Resurfacing Mahoning Ave from Meander Reservoir Bridge to Meridian Rd in Austintown Township, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~107DD96829833EA1F960474372FCDBC52786FF20 83249~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete under the urban paving program on MER SR 29 0.00 to 0.310.~|~05 - 4R Maintenance - Resurfacing~|~AD9E0E71633A96741FD5953B1B36FFB64DCA7753 106495~|~1~|~1~|~01/NFA~|~Encase Pier piles, replace approach guardrail and provide rock Channel protection on two ODNR owned bridges in Barkcamp BEL-1SP-0041(SFN 0726117) and BEL-1SP-0051 (SFN 0726184))~|~13 - Bridge Rehabilitation~|~666A5A6F599DF9ADDDD201A7B9A87B699E2C4664 93890~|~1~|~1~|~01/S>2~|~Reconstruction of Tallmadge Avenue (SR-261) between Dayton Street and State Route 8. Includes pavement replacement, curb, sidewalks, signals. In the City of Akron, Summit County, Ohio.~|~~|~63B9814A06FBF2C98035943CAB17C0CD8410EF25 91848~|~1~|~1~|~01/STR~|~Genereal system chip seal on various routes~|~05 - 4R Maintenance - Resurfacing~|~ADC6E1BC0EAAF279EDF6C03A4A40299E03354D0A 126358~|~1~|~1~|~01/NFA~|~Created plan split for detailed design - NEVI Round 3.~|~~|~6082BC1258A4A243A704F68EDE4F492ACB253A17 126358~|~1~|~2~|~02/NFA~|~Created plan split for construction - NEVI Round 3.~|~~|~FA26BE71804F717AE3EE3D11EBF28B604E35FDB1 98740~|~1~|~1~|~01/IMS~|~?01/IMS/OT/ ? - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on Interstate routes in Coshocton, Muskingum, and Guernsey Counties.~|~~|~F277228ABFB9F88D0989A9E4E3095DE91BF920D7 98740~|~1~|~2~|~02/NHS~|~?02/NHS/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS routes in Coshocton, Muskingum, and Guernsey Counties.~|~~|~E9DF2A9E0A85A8A5E48BFD02D1642DEDC65C0110 98740~|~1~|~3~|~03/S<2~|~?03/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes in Coshocton, Muskingum, and Guernsey Counties.~|~~|~CD77BF75A09F302174B71EBD83C59589C8A8F329 98740~|~1~|~4~|~04/STR~|~?04/STR/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routes in Coshocton, Muskingum, and Guernsey Counties.~|~~|~58FDF25448E469AC1249449D33C6E305E7DE3F48 98740~|~1~|~5~|~05/NFA~|~?05/NFA/OT/ ? - District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes in Coshocton, Muskingum, and Guernsey Counties.~|~~|~4B785614292DFD2B1DBDA16FB1F789FDF3ECCBD8 109040~|~1~|~1~|~01/NFA~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~85FA92640FC0820FDB78E53B4717EEED27CCB8CE 107983~|~1~|~1~|~01/SAE~|~Repair a landslide that occurred along Shawnee Run Road as a result of an ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4C9874C7A41BCB17455478E127660C1250665650 102822~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 50 11.68 (SFN 0501484), ATH 50 14.23 (SFN 0501549), ATH 50 16.81 L (SFN 0501611) and R (SFN 0501638). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~D8720B30B1574B3F6D83A5955E61054E78437B17 102822~|~1~|~2~|~02/S<2~|~Bridge painting project. ATH 682 2.14 (SFN 0504742). Urban other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~FBB9FA626E83BF8D077E9D2CC65FB0D752B7D6EE 102822~|~1~|~3~|~03/STR~|~Bridge painting project. ATH 144 14.06 (SFN 0503304). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~D713B105720A1F0B0F79CD604ED6D54B73D9B435 97513~|~1~|~1~|~01/NFP~|~Costs for sign installation only~|~44 - Other~|~20E885A7BFA4CCE251E2C3F5916773014DDC3509 110089~|~1~|~1~|~01/IMS~|~FRA 70 from 15.5 to 19.37~|~05 - 4R Maintenance - Resurfacing~|~93CC97B659B9BACE25918D764FFE1029F299AFE3 110089~|~1~|~2~|~02/NHS~|~DEL 23 from 7.41 to 7.6, DEL 23 from 9 to 9.14, UNI 42 from 0 to 0.11~|~05 - 4R Maintenance - Resurfacing~|~8742653B9707028451389BE4FABE550BEEF86B94 110089~|~1~|~3~|~03/S>2~|~DEL 750 from 4.21 to 4.43, FRA 40 from 4.33 to 4.39~|~05 - 4R Maintenance - Resurfacing~|~F4E33AAFDA2F3070287ECC2CF5EF5249C467E922 110089~|~1~|~4~|~04/S<2~|~FRA 62 from 1.3 to 1.63, MAR 95 from 17.18 to 17.19, MAR 309 from 18.79 to 18.8~|~05 - 4R Maintenance - Resurfacing~|~80D8F5B659235C866956458218704D13626E7664 110089~|~1~|~5~|~05/STR~|~MRW 229 from 5.78 to 5.97~|~05 - 4R Maintenance - Resurfacing~|~65F7519A656F1E2CC64769837A27E889471C88C1 106124~|~1~|~1~|~01/S>2~|~Reconstruction in the City of Dayton on Salem Ave from Superior Ave to Riverview Ave, to include new street pavement curb, sidewalk, lighting and catch basins.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1FDF98755BE23E441DF40D15B4D5CF5B33418D7C 117322~|~1~|~1~|~01/ENH~|~Upgrade of sidewalks, curbs, curb ramps and crosswalks. Locations include Fayette Street, Jefferson Street, Watkins Street and Chestnut Street. TAP funded project 80% Federal/15% TRC/5% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~53261DF6C56DEF62D5FEA61C9C9D3DD95A071303 95438~|~1~|~1~|~01/STR~|~On SR348 from 12.80 to 18.69 & on SR728 from 0.00 to 1.93, it proposed to resurface the highway.Project Termini: 0.23 mile east of TR118 east to US23 Pave Thru7306164 0.02 mill & fill under RR bridge7306199 0.257306172 1.537305664 13.017305680 17.7680/20 ~|~05 - 4R Maintenance - Resurfacing~|~AAFFE961EA87A3A7048DD7424053B76444BAAD20 95438~|~1~|~2~|~02/STR~|~Bridge rehab7305796 17.517305826 18.04~|~47 - Bridge Preventive Maintenance~|~DE6E980F165B8BE9ACFBC5F7CFB196323860BBF1 88317~|~1~|~1~|~01/ENH~|~Project involves the enhancement of the intersection of Dayton-Xenia Road and Grange Hall Road through the installation of decorative lighting, brick pavers, and landscaping in the City of Beavercreek.~|~31 - Landscaping & Other Scenic Beautification~|~3D40028331B430CDB0983E6B8E3485C35AC97F06 91885~|~1~|~1~|~01/NFP~|~District 10 Office elevator upgrade project. Task Order Agreement No. 16170, PID 88230. Non federal aid project funded 100% state.~|~~|~686E8C337AECA781C8A0A7BF4B8AFEF54FE1F627 91885~|~1~|~2~|~02/NFP~|~Facilities Split~|~44 - Other~|~2477CC71076B2A61967FBEAF1DEEF91EEB1F915B 99733~|~1~|~1~|~01/MPO~|~CMAQ Signal Improvements at 250 locations.~|~44 - Other~|~132C5A7113FB1B33030DD75F13116A1D3442707B 99733~|~1~|~2~|~02/MPO~|~Loacl construction funding for 250 signals.~|~44 - Other~|~50AFE433B908B8971370E223688C410D8BEE9944 119533~|~1~|~1~|~01/IMS~|~Added a split for bridge work~|~13 - Bridge Rehabilitation~|~9E3930E4F9FE9AB7D169A068E99F7478EBD1C895 100608~|~1~|~1~|~01/STR~|~Asphalt overlay of HAS-151 and JEF-151~|~05 - 4R Maintenance - Resurfacing~|~367C5F4322046965124D0861BB2250C6956B1766 100608~|~1~|~2~|~02/STR~|~Pavement repairs within the former Village of Smithfield, funded with state Oil & Shale funds.~|~05 - 4R Maintenance - Resurfacing~|~CCC830ABDEAC1B749FFD9F22E492E059D73C0DFD 104607~|~1~|~1~|~01/S>2~|~Replacing linked structure > 20' Span.~|~10 - Bridge Replacement~|~BF8EE2E5832BACF9AF0995F6A9C8153C4468EEF1 99622~|~1~|~1~|~01/SAF~|~Construct Southbound left turn lane on State Route 534 at the intersection of Clay Street (CR15). Harpersfield Township, Ashtabula County, Ohio.~|~21 - Safety~|~1F024F9B88DB962569C67538E00EDFDDFEB8051F 125024~|~1~|~1~|~01/S50~|~Sidewalk extension, utilizing 100% BOM 4TB7/CMAQ funding.~|~28 - Facilities for Pedestrians & Bicycles~|~58BEB2B55F37EFE72A4322CFB0D46F0278CE1B15 107711~|~1~|~3~|~03/BRO~|~Plan Split for locally funded aesthetic improvements on the WOO-65-2339 bridge~|~10 - Bridge Replacement~|~9114B242A8AD977F64ADFF810406E471F93A2E5C 107711~|~1~|~1~|~01/STR~|~WOO-64-5.89 & WOO-65-6.18 bridges - Non-Federal~|~04 - Reconstruction - No Added Capacity~|~E028A7F075A005A1A0AC8A8F2B6B3C2BCEC88733 107711~|~1~|~2~|~02/BRO~|~WOO-65-23.39 bridge - Federal~|~10 - Bridge Replacement~|~61BDE190F16A6F3E2D14FD57FBC0A8E106E84495 113449~|~1~|~1~|~01/NHS~|~Install bump outs to delineate existing parking areas and repair broken curb, walk, curb ramps and driveways. the project will also add pedestrian lighting in the City of Dayton.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~61D7B5D3A0ADE7CA491C4F8B7716E9E5DC47655C 83629~|~1~|~1~|~01/CMQ/Warr~|~Install left turn storage lanes at Coit Road intersection, intersection realigning intersection, and bank driveway. Install TWLTL from Southern Boulevard to Coit Road. Resurfacing of TRU US 422 from 9.34 to 9.62, in the City of Warren, Trumbull County, Ohio.~|~21 - Safety~|~0314F58BE062A2CA647620FA5A1A86791095538C 87292~|~1~|~1~|~01/NHS~|~Resurfacing TRU SR 11 from 12.60 to 19.02.~|~05 - 4R Maintenance - Resurfacing~|~8DA20794248CD7DC87FDC7DECF5C8411179CC523 87292~|~1~|~2~|~02/NHS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~BCD5E39EFBAD1F93F26FEBB542791329EA3F4A21 76786~|~1~|~1~|~01/IMS~|~Plan split for interstate resurfacing work at 90% fed, 10% state~|~05 - 4R Maintenance - Resurfacing~|~499DE2AC140CC52C0E1E9D69751140A471EA4755 76786~|~1~|~2~|~02/NHS~|~Split for resurfacing work on the NHS at 80/20 fed/state~|~05 - 4R Maintenance - Resurfacing~|~CD61A774A97C8F20DE302CD08F4B6714AAD6D7E9 75645~|~1~|~1~|~01/S>2~|~Repair Bridge No. HAM-22-0740, SFN: 3100871. Bridge carries US 22 over I.O. Railroad.~|~~|~2204B4C58F5023A837520978E9B4A027853482AD 119969~|~1~|~1~|~01/MPO/BEAV~|~Plan split for MVRPC STP funded portions of the project with a 40% local match.~|~05 - 4R Maintenance - Resurfacing~|~49718E984EA8D08F58F4849365C1460B2CF144C7 102599~|~1~|~1~|~01/STR~|~This project is to cover the federally mandated sign upgrades for rural curves on two lane roads.~|~21 - Safety~|~2A4D6CCF962FEFE8AEB59FEA549438E0AE11ABD9 105853~|~1~|~1~|~01/IMS~|~Added plan split.~|~21 - Safety~|~EB2A06E4AF1F63474A1CBCB3E48FDE52EE1A32F1 122103~|~1~|~1~|~01/BRF~|~Bridge rehab~|~13 - Bridge Rehabilitation~|~969033A66FF1F2EA56572F11BB7617D9F3DF20A1 114607~|~1~|~1~|~01/STR~|~Overlay on HIG 50.~|~05 - 4R Maintenance - Resurfacing~|~CDF0401029656D739DD2A925B0A0805364D8F92F 112809~|~1~|~1~|~01/CMQ~|~Plan split 1 for pedestrian accommodations and curb ramp upgrades using CMAQ funds.~|~28 - Facilities for Pedestrians & Bicycles~|~2D94BDD4688CCDE5F8A91031300553459C6DBEF0 112809~|~1~|~2~|~02/SAF~|~Plan split for traffic signal modifications and controller cabinet upgrades.~|~21 - Safety~|~A9B5B0FDD2ACD53A00E67DC45EA52D04787D1558 94671~|~1~|~1~|~01/NFA~|~Replace twin concrete eliptical culverts due to deterioration on SFN 4602358 LOG 273 0296..~|~13 - Bridge Rehabilitation~|~A087A7E459C8867D02109CD0C3B7FA521347E368 126592~|~1~|~1~|~01/NFP~|~Installation of New Waterline Service to Rest Areas 3-33 & 3-34 US 30 Richland Co.~|~44 - Other~|~682A3594F22AD1464270D7AB5CAEE22E845E5421 91802~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing with asphalt concrete in Troy on SR 55 from Nashville Road (SLM 8.21) to the beginning of 4 lane (SLM 9.07) on SR 55 from Franklin Street (SLM 11.62) to Stauton Road (SLM 12.06) and SR 41 from SR 55 (SLM 9.46) to Cherry Street (SLM 9.51) under the Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~79D082FC3E9C4F78FC24DA02DF04641574682A82 91004~|~1~|~1~|~01/SAF/stow~|~Adding sidewalk connectivity at four locations. New speed monitors at crossings. Safe routes to school, in the City of Stow, Summit County, Ohio.~|~21 - Safety~|~E72332E75F55CEEED043AD89731B0180C3BA243C 89270~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for State STP funds~|~~|~9F417F0A42B66E0F2EFEE90D0C46D4D665C4C7D3 124461~|~1~|~1~|~01/CMQ~|~Traffic signal removal project inside Steubenville's CBD area, utilizing 100% BHJ 4TB7 funding.~|~21 - Safety~|~06CA025CDDA8CFE3765E59637FC24E7C1E6BA28A 88965~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District preservation 4PF7 (90% Federal) / 4PS7 (10% State) for Mus-70-(9.50-10.50)~|~05 - 4R Maintenance - Resurfacing~|~98E2DF91EF9E79AB51E953AE4A21162B43CB0F6C 88965~|~2~|~5~|~05/NHS~|~"05/NHS/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) Plan Split for Mus-40-(9.59-10.37)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F5FC66FE340F0704D7848B2D04E70D3DAAAE5307 88965~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation: 100 % Bond Funds 7BPB Capped at $8,227,143.54; then 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Replacement of: 1) 6002587 MUS IR70 9.61 Intersect: Over Us 40 & Timber Run; Not BR Eligible for Replacement: Length=348 SD/FO(0) SR=89.0 DSR=6; 2) 6002617 MUS IR70 9.61 Intersect: Over Us 40 & Timber Run; Not BR Eligible for Replacement: Length=397 SD/FO(0) SR=89.0 DSR=6~|~10 - Bridge Replacement~|~2DEA472E4D3E71D64D616FBD9DBAA4DE5BFCE02B 88965~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - Project Impact Advisory Council (PIAC) Funding 5PI7 (90% Federal) / 4PI7 (10% State) - CAP = $2,000,000.00 for CO; District to provide corresponding CE costs - MOT during bridge replacement of MUS IR 70 9.61 L/R.~|~10 - Bridge Replacement~|~55E491CA288B1DCF397BFB1FD8F8B29B3BC19185 88965~|~2~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) Plan Split for Mus-40-(9.14-9.59)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3E9C47DA12365F1256ED3DA4BFB0619EB26ED607 91758~|~1~|~1~|~01/NHS~|~Corridor rehabilitation with access control and drainage correction. WAS 7 17.60-20.57. Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~204420413BB3054B2D9DCAA29260D6404A0C2786 91758~|~1~|~2~|~02/MPO~|~Asphalt resurfacing of WAS TR 720 0.00-1.15. Work includes guardrail and minor turn radius improvements. 80% Federal MPO and 20% Local match.~|~05 - 4R Maintenance - Resurfacing~|~7082FF072063D3A0FA2E4BF797BA956F9B9CF9D4 103433~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4.~|~21 - Safety~|~219A0343781C602ECB71CF6A63670F35180BA03B 98797~|~1~|~3~|~03/NHS~|~Resurfacing on Main Street from Lincoln Street to Center Street. 80% federal funds from the District Preservation Program budget. The 20% match will be provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~15F9C35C987097BFE974773AB9946EBA4AA98EAF 98797~|~1~|~1~|~01/ENH/FIND~|~Work funded through the Transportation Alternatives Program (TAP). Main Street is on the NHS.~|~28 - Facilities for Pedestrians & Bicycles~|~DD24400DC70EE85F78EC082E1DE9A8396F86B686 98797~|~1~|~4~|~04/NFP/FIND~|~City of Findlay funded non pavement work. No state or federal funds. 100% local funds. Landscaping costs.~|~31 - Landscaping & Other Scenic Beautification~|~B3D678CE49C7C1A3B9B1F935728B806EA6211E29 98797~|~1~|~2~|~02/NFP/FIND~|~City of Findlay funded pavement work. No state or federal funds. Not on State route. 100% local funds.~|~05 - 4R Maintenance - Resurfacing~|~BAB21697375AA51D3351F9254DD44C051F9ED78C 113503~|~1~|~1~|~01/SAF~|~Work funded by the Safe Routes to School program and MPO-CMAQ funds. The MPO CMAQ funds will be used first and then the Safe Routes to School funds. Funds needed over the caps to be provided by the City of Delphos. The Safe Routes to School funds will be used at a 100% rate with the use of Toll Revenue Credit. The MPO-CMAQ funds require a 20% local match provided by the City of Delphos.~|~28 - Facilities for Pedestrians & Bicycles~|~E00DD76EF4752EBB94767EFCAF9083812F6938D6 116980~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MOE 26 17.76-14.80.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~086D45BDBF93084BEFEE3792BFFB76D891C4E2E1 93389~|~1~|~1~|~01/IMS~|~Districtwide systematic guardrail end terminal upgrade on CLA IR 70 2.81 to 2.82.~|~21 - Safety~|~3D51982FF427AFFAE2280B1039EA12898A9D48AE 93389~|~1~|~3~|~03/S>2~|~District Wide Systematic guardrail end terminal upgrade on MOT US 40 10.78 to 13.33, MOT SR 4 17.31 to 17.72, MOT US 40 10.19 to 10.78, MOT US 40 16.08 to 16.10, MOT SR 725 12.78 to 18.68, MOT SR 741 5.47 to 6.63, MOT SR 48 13.16 to 21.98, MOT SR 48 1.27 to 13.06, and MOT SR 725 19.75 tp 22.02.~|~21 - Safety~|~4F246C07F627A022F90C763EA6D0C9288684EB01 93389~|~1~|~2~|~02/NHS~|~District wide systematic guardrail end terminal upgrade on MOT US 35 14.53 to 19.87, MOT SR 4 from 17.72 to 21.76, CLA US 68 5.62 to 5.81, LOG US 33 15.68 to 18.24,AUG US 33 13.40 to 15.12, MOT US 40 13.33 to 14.32, LOG US 33 18.24 to 26.05, AUG US 33 13.09 to 13.40, MOT SR 4 21.76 to 22.37, MOT SR 49 8.16 to 8.17, MOT SR 4 22.37 to 24.02, and LOG US 68 9.74 to 9.75.~|~21 - Safety~|~8D22EFF43F3306114C824C5C74B1D7AF60C788C4 93389~|~1~|~4~|~04/S<2~|~Districtwide Systematic guardrail end terminal upgrade on CLA US 40 14.06 to 14.08, CLA SR 41 19.86 to 21.00, SHE SR 47 13.92 to 15.25, DAR SR 571 13.01 to 13.02, MIA US 36 11.18 to 11.46, MIA SR 48 15.63 to 17.74 and SHE SR 48 2.59 to 3.20~|~21 - Safety~|~DF051C48BFAFB0119E0E987C9AA8D4F838BB9FF7 80450~|~1~|~1~|~01/S>2~|~PROVIDE CENTER LTL ALONG PROJECT AREA, AND DEDICATED TURN LANES AT INTERSECTIONS. RESURFACING THE EXISTING ROADWAY, WITH JOINT REPAIRS AND CULVERT REPAIRS on CLA CR 33 from milepost 0.527 to the Enon SCL Dayton-Springfield Road.~|~21 - Safety~|~3C7DE39955C762381B8AD757A69B4C0615BFD9C8 123678~|~1~|~1~|~01/BRO~|~All Work is within this split.~|~47 - Bridge Preventive Maintenance~|~BB09FFF4ACCA7197F9CD13EFFED9D1058E77BD1F 95339~|~1~|~1~|~01/NFA~|~Toledo harbor lighthouse.~|~44 - Other~|~819B75913E8FA0B74A8BEF1939A8078847988018 101243~|~1~|~1~|~01/STR~|~Resurfacing SR 120 slm 9.48-14.12 (STP Rural eligible).~|~05 - 4R Maintenance - Resurfacing~|~71B3172DFE9923F8AE40F2798C2E9560A3397E83 101243~|~1~|~2~|~02/STR~|~Various bridges.~|~13 - Bridge Rehabilitation~|~26D9CFFE12271E727CFE84F62E31B98449E221EC 94502~|~1~|~1~|~01/NFP~|~District wide long line pavement marking plan for FY 17~|~21 - Safety~|~8D4FB75C57411805633109208AFC03B1382F1F81 95064~|~1~|~1~|~01/SAF~|~Safety funding for WB RTL on SR-750 at US-23~|~21 - Safety~|~153D8A20440BB078BD55D3CCE5416886622082DD 95064~|~2~|~2~|~02/SAF~|~Safety funding for a second SB LTL on US-23 at SR-750~|~17 - Construction Engineering~|~A567781C58A4FF10568DA49E0EB98884E9B702B0 98303~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair in Franklin County~|~44 - Other~|~9157029C0E79AF18CAEA56644FBB428826810083 98303~|~1~|~2~|~02/SAF~|~Add sign truss in the IR270/SR161 interchange as part of a safety improvement~|~44 - Other~|~2AB12B0D43573C5423AB26E01CBD7036C945524C 108814~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 39 over Crab Run by improving the wearing surface and protecting the bridge foundations from scour. In stream work is required.~|~13 - Bridge Rehabilitation~|~D121F15FF0D01BCD081BE8ACC39436E9254E5053 101195~|~1~|~1~|~01/NFA~|~This plan split is for the Non Federal routes.~|~~|~8A560E701B20CEC73DED9F2A773D59E270D92950 101195~|~1~|~2~|~02/STR~|~Smooth seal on rural routes: MIA SR 718 SLM 0.00 to 3.26 & MIA SR 721 SLM 3.21 to 5.51.~|~05 - 4R Maintenance - Resurfacing~|~B45EA658752F967ABBA597233505D442221BA7DF 80117~|~1~|~1~|~01/NHS~|~Rehabilitate the existing 1540-ft long culvert (COL-7-0595, SFN 1500090) by repairing the newer concrete sections and the older stone sections.~|~10 - Bridge Replacement~|~C3025CC4AD180BF4FA052531A7DA4161DF425332 126240~|~1~|~1~|~01/STR~|~Culvert replacement project WAS-339-7.16~|~04 - Reconstruction - No Added Capacity~|~252CB73A50DEBEC239CA51BDC0590C778F8943FF 92958~|~1~|~4~|~04/NHS/NEWA~|~"02/NHS/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Newark on 1) Lic-SR 13-08.37 to 09.87; NOTE: This is a Principle Arterial Segment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7F244079E9FF4B7DF27A03A0F26209C1D1983106 92958~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with repairs on Lic-SR 13-00.54 to 06.48~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~14E5129D47D12635BB63061CC6F64A0F22158353 92958~|~2~|~7~|~07/S<2/HEAT~|~"07/S<2/PV/HEAT" ? LCATS/City of Heath Paving 4TA7/LC05(80% Federal) / 4BG7(20% Local) ? CAP = $323,000 LCATS Funds - Resurfacing with related repairs on Lic-CR 311-00.00 to 01.48 Hopewell Drive;~|~05 - 4R Maintenance - Resurfacing~|~CDE9FA2C72A2D67678A6E57DA917846ACBC6B4AA 92958~|~1~|~6~|~06/STR~|~"06/STR/PV/ " ? Facilities Paving LBM7(100% State) ? No CAP - Resurfacing with related repairs on District 5 Heagquarters Parking Lot and driveways;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~571A098C6FEEC41338FA39F28B749A50491D2C82 92958~|~1~|~3~|~03/NHS/HEAT~|~"03/NHS/PV/HEAT" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing with related repairs on Lic-SR 13-07.76 to 08.37;~|~05 - 4R Maintenance - Resurfacing~|~53DEDE24074DCA6C5D073BD69AB9615E2C6385FA 92958~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation Paving 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with repairs on: 1) Lic-SR 13-00.00 to 00.54; 2) Lic-SR 13-06.48 to 07.76;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F06FCC39FD7B910C7B00E1EB4D81078459D19FE3 92958~|~1~|~5~|~05/NHS/NEWA~|~"05/NHS/OT/NEWA" - 4BG7(100% Local) - No CAP - Costs for ADA Ramps and any other items or work requested by the City of Newark.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9576F52628631D8D863D550DA3FE460BEFE49710 92958~|~3~|~8~|~08/STR/DAWE~|~"08/STR/PV/DAWE" - Dawes Arboretum Turn Lanes - 4BG7 (100% Local) - No CAP - Widening of SR 13 to facilitate turn lanes into Dawes Arboretum. Lic-SR 13-03.85 to 04.21 NOTE: CE to be billed under Plan Split 2 for the resurfacing after the road is widened.~|~04 - Reconstruction - No Added Capacity~|~3CEEF9C8A635D8E121A09597CFB8BD4D5E370919 112743~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing of Terex Rd from Londonairy Blvd to Barlow Rd (West) in the City of Hudson.~|~05 - 4R Maintenance - Resurfacing~|~EC26F32975136B5C66E723732ACF95D9F9AADC38 117065~|~1~|~1~|~01/MPO/NORT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C33838ACD582A7E64C4F772415D252CAC9AD07DC 124954~|~1~|~1~|~01/MPO~|~OKI RPP eligible expenses~|~05 - 4R Maintenance - Resurfacing~|~452807EFDAA61DD4438AEFCB38B089D808A978D9 76823~|~1~|~2~|~02/S<2/FIND~|~02/S<2/PV/FIND Work inside the City of Findlay. Work on SR568 is covered by this event. The City of Findlay is responsible for paying the 20% nonfederal match.~|~05 - 4R Maintenance - Resurfacing~|~A275B764DC55EBE1057039D6D89DA4CEB83A2C1E 76823~|~1~|~3~|~03/NFP/FIND~|~Work funded 100% by the City of Findlay for auxilary pavement markings and curb ramps.~|~44 - Other~|~E2B7298B8D66FD8D01A6C790B574F56B0CFFD42C 76823~|~1~|~1~|~01/NFA~|~01/NFA/PV/ Work on SR 330. This state route has a Functional Classification of Rural Minor Collector and is therefore, not eligible for federal funding for resurfacing. All the work on SR 330 in this project in covered with this split.~|~05 - 4R Maintenance - Resurfacing~|~FD63EE80B106D0A33EC9BABEDFB5B35FEDF90F11 86517~|~1~|~2~|~02/ENH~|~Enhancement items on sfn# 7632894, Greenbower Street over the Mahoning River, Lexington Township, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~1109C0704F1F4D9E38E90BEA88626EFCB7F171EB 86517~|~1~|~1~|~01/BRF~|~Replacement of sfn# 7632894 (Greenbower Street) over the Mahoning River, Lexington Township, Stark County, Ohio.~|~10 - Bridge Replacement~|~E39FDA74E3A7022232860643D75DB68A8ED81BB4 98019~|~1~|~1~|~01/STR~|~Resurfacing and related bridge maintenance work.~|~05 - 4R Maintenance - Resurfacing~|~6473F4A9361D523E0DF887644462B36774757A5B 119810~|~1~|~1~|~01/BRF~|~ATH-Glouster Madison St. Bridge Replacement~|~10 - Bridge Replacement~|~4B5B1A4ABF9985D9E590A55877C893071A5BA17B 114488~|~1~|~1~|~01/STR~|~Split for rural resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~BF4CF38AFC14DA31E1C16F81257B06E7F7C8FB52 85313~|~1~|~1~|~01/MPO~|~Paving and realignment~|~~|~872ED6926501A229B8A07810112F63C4C09AC28B 90898~|~1~|~1~|~01/SAE~|~Install missing sidewalk connection on Wooster Pike near Park Ave. Upgrade existing asphalt sidewalk on Murray Ave. Reconstruct median at Wooster Pike and West Street. Restripe Wooster Pike within the Village Corp. limits to standard 12' lanes for traffic calming.~|~~|~B11475448A0A020C8DD14E9E5348EE0A958D440B 86127~|~1~|~1~|~01/S<2~|~Reconstruction of SR 585 in the City of Wooster~|~04 - Reconstruction - No Added Capacity~|~162369D7E39C0AD851C91039925DFE60F0237348 86127~|~2~|~4~|~04/S<2~|~Part 2 Urban Paving 100% City of Wooster Items WAY-585-00.31 - 00.65~|~05 - 4R Maintenance - Resurfacing~|~3A4904B35B109CD01C87060BD0C6B1B0906C2AB1 86127~|~2~|~3~|~03/S<2~|~Part 2 Urban Paving - 80/20 - District Allocation/City of Wooster WAY-585-00.31 - 00.65~|~05 - 4R Maintenance - Resurfacing~|~9780D5CBAC1831FBBCDE213CD65BD51804CF831B 86127~|~1~|~2~|~02/ENH~|~Sidewalks & Bike Trail~|~28 - Facilities for Pedestrians & Bicycles~|~DE4BF6FA005FC96E2AFE80F9F6AC2F16D32A8D48 124567~|~1~|~1~|~01/NHS~|~Work for replacing retaining wall~|~31 - Landscaping & Other Scenic Beautification~|~12474B4A70722B5DB18CAB364549F8965CF512A8 104692~|~1~|~1~|~01/IMS~|~Bridge deck replacement. WAS 821 3.13 (SFN 8405255). Interstate route funded 90 federal/10 state.~|~13 - Bridge Rehabilitation~|~191445B71486B938AB9A1D32243F56B8D05765AC 98910~|~1~|~1~|~01/S>2~|~Douglas Rd~|~04 - Reconstruction - No Added Capacity~|~737C00B6AA0FF83FB95C660392DD460B17EC11B9 75523~|~1~|~1~|~01/NHS~|~This split is for resurfacing work on the NHS. All the resurfacing on SR 15 in this project is in this split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1293C830889A7C2E4314307130ADC55304D551AF 118698~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 33 0.00-4.21~|~05 - 4R Maintenance - Resurfacing~|~620158E0AB45100784EF5B5E87DC6338DA0EBE96 118698~|~1~|~2~|~02/STR~|~Resurfacing HOC-180-11.92-16.01~|~05 - 4R Maintenance - Resurfacing~|~3ED3F04A1FE2FBC466B7DEE651A27974A3B66D72 22198~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work on I-90 using federal IM funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6CCF66749AE801073DE2138C3380FC4E08DD8A9B 22198~|~1~|~2~|~02/SAF~|~Microsurfacing ramps at 3 locations along I-77 using safety funds plus 4 additional locations with district allocation~|~21 - Safety~|~C0345FCFE3C6667186D0507B6C7FE50726CAF869 112005~|~1~|~1~|~01/S5K~|~Guardrail upgrade/replacement project for FY2026. Various routes and sections in D10. Funded 80% Federal/20% State.~|~21 - Safety~|~298BD30778BEB312E3D85CE3FF872617BD4F0629 112005~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement project for FY2026. Various routes and sections in D10. Funded 80% Federal/20% State.~|~21 - Safety~|~3256F491221290E8DA314DE2BA26E80BC3258AA0 112005~|~1~|~3~|~03/NFA~|~Guardrail upgrade/replacement project. HOC 374 21.05-24.76.~|~21 - Safety~|~81B11B237054928E34E3368E9B8EDC741C29EFC6 97974~|~1~|~1~|~01/NFA~|~Oxford Road (CR-60) Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F131D3CE6337E90693BF13D056FE77CF09E1C2F9 100679~|~1~|~2~|~02/S<2~|~Spot paving MAR-4-13.81 to 17.21~|~05 - 4R Maintenance - Resurfacing~|~0FEE356390E8CE0C57D2A761E978DFD34FAB5439 100679~|~1~|~1~|~01/NHS~|~Spot paving on the NHS system. MAR-4-13.55 to 13.81~|~05 - 4R Maintenance - Resurfacing~|~B442397EA49A38B3FA503BF78A975AEB91EBC9E7 100679~|~1~|~3~|~03/STR~|~Spot paving MAR-4-17.21 to 20.49~|~05 - 4R Maintenance - Resurfacing~|~1ADE99E959294DF29F2AA606E2CE12EE215C1045 110561~|~1~|~1~|~01/STR~|~JAC-327-13.58 SFN 4003616 Bridge Replacement.~|~04 - Reconstruction - No Added Capacity~|~8F90C6589C3F83EC3EA1B45912D1C632EE8DF049 110561~|~1~|~2~|~02/NHS~|~added plan split to capture NHS bridge.~|~13 - Bridge Rehabilitation~|~2988D04F0FEDCAEB6D375D5A7639E9105AE82B63 90423~|~1~|~1~|~01/NHS~|~Culvert Replacement~|~44 - Other~|~25FD56B21A5A87CCEB6FED02B02F019D314448BD 109374~|~1~|~1~|~01/SAF~|~Replace the existing span wire traffic signal supports with mast arms at Spring Valley Road in Centerville.~|~21 - Safety~|~95A1B5F739BF6335B91CC45D5FB96F583C2D8787 109374~|~1~|~2~|~02/SAF~|~Alternate bid signal related items not eligible for federal participation.~|~~|~1BCC7F1FD3FE2BA941D1C800E801D49B47C1949D 101951~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~8041E96CB75CEA7E2EB0446B4DC589F75A388972 101951~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~964847D2CDFEB2A13196117B8062B5B6065F8F30 101951~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5EFA9A4287596D3A3C2576DA9C0E51C85DC3CA1F 101951~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~E75AA047FC1245A533EA2D54BBEB64A486903540 107840~|~1~|~1~|~01/IMS~|~Hydro-demolition and deck overlay FRA IR 70 17.73 over Short St~|~13 - Bridge Rehabilitation~|~73F9DC22462843B5003356C486A1A679ECF3F39A 84207~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY 2014. Various routes and sections throughout D10. Funded 100% State.~|~44 - Other~|~F5FE23D2A27EC518559CF3BA5F2D8A01A3EA9637 120436~|~1~|~1~|~01/NFP~|~Plan Split - 01/NFP/PV/ 100% State (4PS7)~|~21 - Safety~|~FF3E03DD0D1C9CC2F91F4E5206AF52502983C903 116690~|~1~|~1~|~01/NHS~|~NHS Plan split for resurfacing and resurfacing related items for MAR-23.~|~05 - 4R Maintenance - Resurfacing~|~700E70416B1FE65379D1716C1207614379FFC985 121657~|~1~|~1~|~01/IMS~|~Bridge Rehab~|~13 - Bridge Rehabilitation~|~29FC7B88755FA3462D7CEE5363BCD5C1E6B7262F 106392~|~1~|~1~|~01/BRF~|~Rehabilitation of SFN 2460068 carrying Temple Street Bridge over Paint Creek Work includes new superstructure. deck, and approach slabs. Funded through the Municipal Bridge Program.~|~13 - Bridge Rehabilitation~|~C72567882F565C42DE3CA9FA8A71564EDB550DAE 108019~|~1~|~1~|~01/NFP~|~Signal and Lighting Reactive Maintenance~|~44 - Other~|~CDCBA956E4D2BA45D44B87257C2E5CC1003D5B7F 108019~|~1~|~2~|~02/SAF~|~install backplates.~|~21 - Safety~|~450DEF394620A2C73390A3A05FF6120E2CFF7892 116005~|~1~|~1~|~01/SAF/MCEO~|~"01/SAF/OT/MCEO" - 90% Federal (4HJ7) and 10% State (4BC7) - roadside ditch improvements and signing/marking improvements.~|~~|~A6F816021F23EE251046741B6266FBA75172C92F 108819~|~1~|~1~|~01/NFP~|~Replacing two culverts, relining one culvert.~|~04 - Reconstruction - No Added Capacity~|~25128065234B6124B2D1C39671026E5260D5132D 102476~|~1~|~1~|~01/S<2~|~1"FGP asphalt overlay on BEL-250~|~05 - 4R Maintenance - Resurfacing~|~260DD2465C1FCCCE8584A717F2069F65E0B34798 100253~|~1~|~1~|~01/MPO~|~Rehabilate Center Street using MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~90605ECA0A95FE168F8F7315C6336A5B1E117BD9 98568~|~1~|~2~|~02/STR~|~Plan Split for the resurfacing and related pavement work on CLI-73 on the Rural portion. Limits between SLM 2.49 - 6.24~|~05 - 4R Maintenance - Resurfacing~|~B8A71BA86D15428800AE30897A05A33718CBBD47 98568~|~1~|~1~|~01/NHS~|~Plan Split for the resurfacing and related pavement work on WAR-73 SLM 20.05 to 20.73.~|~05 - 4R Maintenance - Resurfacing~|~234FC34037EE77C8F3D6F9E38A77AEF0E6966323 98568~|~1~|~3~|~03/NHS~|~Plan split for the resurfacing and related pavement work on CLI-73 on the NHS portion. SLM 0.00 to 2.49.~|~05 - 4R Maintenance - Resurfacing~|~4E715A8DB11C26A8A569BF3D1F9301434963F319 98568~|~1~|~4~|~04/STR~|~Bridge Maintenance on rural route bridges.~|~47 - Bridge Preventive Maintenance~|~B2802BFE22A558C83240DEB0199EC05570AEF4E7 98568~|~1~|~5~|~05/NFP~|~Caesar Creek State Park Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B055952F877835F26D527D4D43993016EAF1E4EB 104013~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder.~|~21 - Safety~|~8350C1F70865296819547A9D74EF29B695FFC233 116620~|~1~|~1~|~01/MPO/NORT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B5FC7C80251176491151E677B191786E73BC8758 96697~|~1~|~1~|~01/NFP~|~Removal of underground storage tank and replace with 2000 gal. above ground storage tank. Project location is at Unity Outpost in Columbiana County.~|~17 - Construction Engineering~|~054DB276E16E34CCF62E0508A6E7A1430E514828 108950~|~1~|~1~|~01/ERD~|~Repair and resurface work on Smith Road eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~0CB44F5AF47BA48D20C7BBFDFE61DD9E40856E29 108950~|~1~|~2~|~02/NFP~|~Work that is 100% local participation~|~05 - 4R Maintenance - Resurfacing~|~0CA20495A394EF1F1CA77AE28207920E06D8B52D 105530~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-4-0.00-1.98~|~05 - 4R Maintenance - Resurfacing~|~BBEC4FFD016D48F5ECA3C20592A8DE3E863F078C 105530~|~1~|~2~|~02/NHS~|~Priority System NHS Split: DEL-23-9.14-9.34, 9.78-9.90 & 10.81-13.08 FRA-161-22.68-23.71 FRA-317-15.97-15.98 FRA-23-1.95-2.20~|~05 - 4R Maintenance - Resurfacing~|~4C0ACB92B49A4F8219DC6993C46CB99CD05B7F6B 105530~|~1~|~3~|~03/S<2~|~Urbanized Area (Columbus) Plan Split: DEL-42-5.20-5.35~|~05 - 4R Maintenance - Resurfacing~|~5FE3DC1F63394306147346E31B63E983BBAE9580 105530~|~1~|~4~|~04/IMS~|~Interstate Plan Split: FRA-270-43.18-52.16~|~05 - 4R Maintenance - Resurfacing~|~DA3BF28F8A015DC992B0D59640828DDCE65719AD 121281~|~1~|~1~|~01/NFA~|~All Work is within this split~|~47 - Bridge Preventive Maintenance~|~84E1F40FDDA2E8039E15981147FA7B11DE278014 107244~|~1~|~1~|~01/NHS~|~Slide repair on BRO 52 16.22.~|~04 - Reconstruction - No Added Capacity~|~13E76CDE8F11A62B880285638B666F90291080C8 108442~|~1~|~1~|~01/NFA~|~OH18-01 ER Event. Landslide repair project. MOE 255 17.06. MOE_NF_0011. Non on any federal aid system funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A01B5F0D5B82E63E5C1FF94B3C73F0FBE9FA8C2C 108442~|~1~|~2~|~02/NFA~|~OH18-01 ER Event. Landslide repair project. MOE 255 17.32. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~202C2A65513CC728E5145A3ACD9596DA8A6A5D6E 116599~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of GRE-35~|~05 - 4R Maintenance - Resurfacing~|~4D8AEE56D5C14C7BEE3A00B7946BCBA36B3F268A 102541~|~1~|~1~|~01/MPO~|~Intersection Improvement.~|~21 - Safety~|~33089B56F9D0482EE811EBFEE07004BE0357864A 101274~|~1~|~1~|~01/NHS~|~Resurfacing US 6.~|~04 - Reconstruction - No Added Capacity~|~897B2BBEEEE63BA91F630DC217EAB9AE8E165317 101274~|~1~|~2~|~02/SAF~|~Center line Rumble Stripes Plan split - Hen-US 6- 0.0 - 3.74~|~21 - Safety~|~E2FDA3DDE7B1C5BF8B8E13A3BC17DCD93AA05AB7 101274~|~1~|~3~|~03/NFA~|~Motorist damage in construction zone.~|~04 - Reconstruction - No Added Capacity~|~6D6B7D7323AAF3C9BB4C3DDFA6A43D0745575189 108033~|~1~|~1~|~01/NFP~|~Pavement Marking~|~21 - Safety~|~90E05AA8E7A150BB96F18421973629353D54CB19 89403~|~1~|~1~|~01/STR~|~On SR220, 0.37 mile west of Pleasent Hill Road (SLM 6.10 to 6.23), it is porposed to provide support for the shoulder and roadway along the north side of the pavement. 80/20 split 01/STR/OT/State~|~21 - Safety~|~835AE587EB18C1EB88388F55AC508FF5D73AB1A8 90932~|~1~|~1~|~01/SAE~|~Sidewalk additions~|~28 - Facilities for Pedestrians & Bicycles~|~42EECC5C7FF5C90505A4AF2823E42D0E640207A7 92120~|~1~|~1~|~01/STR~|~FHWA Disaster OH11-02 flood: DSR HOL-002:Embankment slip causing pavement to settle. Fix slide by lowering the profile of the roadway.~|~04 - Reconstruction - No Added Capacity~|~2840CE28F018B1546C2C3037DAA1601F9F58FE5E 110368~|~1~|~1~|~01/IMS~|~Replace deck and superstructure on Claycraft Rd structure over IR 270~|~13 - Bridge Rehabilitation~|~0913A1BACAB5A3E5F01A6DF63954657308AE7473 110368~|~1~|~2~|~02/IMS~|~Cost to repair damage from vehicle accidents~|~13 - Bridge Rehabilitation~|~25EC62BF82E43EFFA417D859D263E213D93B20E7 104193~|~1~|~1~|~01/STR~|~Geological Site Management Project - 4SF7 (80% Federal) 4SS7 (20% State) - No CAP - slip repair on SR 285 between SLM 5.35 to 6.06.~|~44 - Other~|~F7B10B8E284A6DD5FF03810B5FF37D1B9828FD11 105160~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~04 - Reconstruction - No Added Capacity~|~A31805C382586C757BDF5981EE5D4873807F2301 121739~|~1~|~1~|~01/STR~|~culvert replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A7C5BD7108267D27E65DBCF13E462120DC567D09 121739~|~1~|~2~|~02/STR~|~culvert replacement~|~~|~AD6CE8C9E0673CCDB1DC8671EE7BBE92B7E4BB78 98994~|~1~|~1~|~01/NHS~|~FUL-20 @ 25.10 Culvert~|~17 - Construction Engineering~|~D284D2F16F014F8313D78C65343863BBA5E3210C 113547~|~1~|~1~|~01/IMS~|~Plan split for bridge painting on the interstate~|~47 - Bridge Preventive Maintenance~|~225B98301007787B0598B30D7639B1E85E214BF7 88852~|~1~|~1~|~01/STR~|~Bridge Replacement: ERI-113-13.51 (SFN 2202972)~|~10 - Bridge Replacement~|~10C01C14CC0CCD1C205A5FE832B24580A7994E2D 88852~|~1~|~2~|~02/S<2~|~Culvert Replacement: HUR-061-21.08~|~44 - Other~|~9965A68DCA4930558F26B448EA33BC53DA628A94 107574~|~1~|~1~|~01/IMS~|~Mowing contract for SFY 2020~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E239B3B638E90755330B396ABD0433CC76C22DE5 107574~|~1~|~2~|~02/IMS~|~Mowing contract in D7 on:MOT IR 675 SLM 0.00 to 7.44MOT IR 75 SLM 0.00 to 9.31~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DAF9F31D6D038CB76339D86BB06D562D0A49AE18 101440~|~1~|~1~|~01/IMS~|~This plan split includes FAY IR 71 9.45-14.66 and MAD IR 71 0.00-4.56~|~05 - 4R Maintenance - Resurfacing~|~3962D6ACCC4FA6C3FD19F276F08744E34412CF1A 101440~|~1~|~2~|~02/STR~|~This plan split includes PIC SR 752 from 2.34-8.43.~|~05 - 4R Maintenance - Resurfacing~|~12EED33278336300F2830697F7D4A6187DC8B8D3 106671~|~1~|~1~|~01/ENH~|~Restoration of brick pavers, curb and sidewalk, drainage, lighting, etc.~|~44 - Other~|~B43C964F54F5BFB6F3B116BDC7A40347EB919394 106671~|~1~|~2~|~02/ENH/EL~|~Waterline work with 100% OPWC/Local funds.~|~44 - Other~|~051C6A19A1ECF4C4EA49F7BEE8F60B85D4C68236 110445~|~1~|~1~|~01/SAF~|~Traffic signal installation at the intersection of US 36 and SR 257~|~21 - Safety~|~E89E082FEBD062D4A10925C8B18107AA7F1EFF6C 89242~|~1~|~1~|~01/SAF~|~A CEAO HSIP funded project to build a roundabout at LUC CR24 7.25-7.26/LUC CR71 1.25-1.26~|~01 - New Construction~|~4ABD928FB5CFDC74D75E6000D237998069B048A8 120438~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~B21D950B523B873FB2D811C22F8588717B63E0BA 97738~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~BED4ECB1D312874D9C82D82C1E3A6DF43E4D5A32 125649~|~1~|~1~|~01/STR~|~Resurfacing SR 164~|~05 - 4R Maintenance - Resurfacing~|~468FFB3568FD34DCB498B289C7C518DFBBD48987 96293~|~1~|~1~|~01/NHS~|~ROS US 23 12.02~|~05 - 4R Maintenance - Resurfacing~|~03E6AE759D01888E3262A306F0BBA0F413B2786C 125657~|~1~|~1~|~01/STR~|~Plan split for the rural locations ~|~05 - 4R Maintenance - Resurfacing~|~5C4D9AC28763EE078CE56CE98145BECBFF432FF2 93607~|~1~|~2~|~02/MPO~|~Work items eligible for CMAQ federal funding for the intersection improvement.o CMAQ funds --- 80% fed / 20% local participation~|~21 - Safety~|~334FD47B46EBFDF00FCDA18C7E6A5E43AD5D2CA6 93607~|~1~|~1~|~01/SAF~|~Work items eligible for federal for the intersection improvemet using Safety funds. Any non-fed eligible work and work beyond the cap will be 100% local.o Safety funds --- 90% fed / 10% local participation~|~21 - Safety~|~B8CDA854FF99D3764D2D05C534CFAD153A374CF5 93607~|~1~|~3~|~03/NFP~|~Work items not eligible for federal-aid and cost beyond available federal fund sources~|~21 - Safety~|~9F04E3C9201C66291941F23FDE7879AD278E1E98 102271~|~1~|~2~|~02/NHS~|~ROS 35 (19.70-19.72)~|~21 - Safety~|~B670D5D693BD41F089439C0A0425ABCCA04DABC4 102271~|~1~|~3~|~03/S<2~|~SCI 140 (0.70-1.10)SCI 140 (3.20-3.50)SCI 140 (4.80-5.10)~|~21 - Safety~|~B6D51AAF633C278883AD760FEB151ED4D1EC92BD 102271~|~1~|~1~|~01/STR~|~BRO 41 (3.42-4.48) 80/20 PreservationSCI 140 (8.60-9.20) 90/10 Safety~|~21 - Safety~|~5B5F292C76BD5D962538B2483AB7901A30AE1973 86129~|~1~|~2~|~02/STR/FCEO~|~"02/STR/OT/FCEO" County Engineer's Association Highway Safety Improvement Funding 4HB7(100% Federal) - CAP = $300,000.00 Federal dollars total for Plan Split 1 & 2 - Installation of Guardrail~|~21 - Safety~|~3F9AB4863EEA925312E4B020CAFC594EF5438165 86129~|~1~|~1~|~01/NFP/FCEO~|~"01/NFA/OT/FCEO" Fairfield County Guardrail Project on non federal aid routes. CEAO funding at 100% w/ maximum of $300,000~|~21 - Safety~|~68349EAE10ABBFA601B02B3E9DC2573C804AFC7E 119417~|~1~|~1~|~01/BRF~|~Bridge rehab project. ~|~13 - Bridge Rehabilitation~|~BD96027B798836B57D19F08A207E33C416A55234 123710~|~1~|~1~|~01/MPO/STCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~12C9D1044A8707E41C616CF0D518F9AE50EF690F 88353~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 4301625; LAK-002-1597~|~13 - Bridge Rehabilitation~|~D86BFE607DE0929520045A0F1A7CB929BDD2E419 98891~|~1~|~1~|~01/NFP~|~A TID funded project for the resurfacing of ATH CR 7. Agreement number 18593.~|~05 - 4R Maintenance - Resurfacing~|~0E33C236A3927C534DBBE28B4995122A22FBEA9C 92551~|~1~|~2~|~02/NFP~|~D5 HVAC Permits~|~~|~117664C1F0812EFF6EEEB3C09657C34368428756 92551~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities 4MA7-005 - No CAP - Installation of new central A/C system for District Headquarters.~|~44 - Other~|~575C369A2371CDAD0EA33494E1EBF39EDE069E71 104976~|~1~|~1~|~01/IMS~|~Plan Split for bridges FRA-270-0.96 and FRA-270-1.52~|~~|~7A3674BF7495CCFD6E266BCDF5299532D278FE35 100891~|~1~|~1~|~01/STR~|~SCI 139 11.38 (SFN 7303815)~|~10 - Bridge Replacement~|~545F5CD0F068FB25BA3749BF6BE3BFF7461369A3 100891~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~BF9F3741C5B8F6B69E29356D9DF4C815CC20A38F 93266~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Rehabilitation on 4505069 LIC SR79 22.76 Intersect: Trib Rocky Fork Creek; Not BR Eligible for Rehabilitation: Length=13 SD/FO(0) SR=87.9 DSR=" "~|~04 - Reconstruction - No Added Capacity~|~80C103AF935D65C281553A76D195E0BA2799F29D 88678~|~1~|~1~|~01/NHS~|~Resurfacing a portion of SR 129 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~D929A20A023CE8B697BD00B0726B6D9864F5CBF1 88678~|~1~|~2~|~02/NHS~|~Bridge work on NHS route bridges~|~13 - Bridge Rehabilitation~|~D47A2DE2F287D3E27DBB9868EC16626D9E09B7E7 94211~|~1~|~1~|~01/NHS~|~Repair bridge carrying SR 7 over Pinch run Belmont County.~|~10 - Bridge Replacement~|~F7AB5749591E11B0442AC329691D4B76764BCB7A 127095~|~1~|~1~|~01/NFA~|~SOPEC EV Charger projects ~|~63 - Electric Vehicles & Charging Infrastructure~|~63582BCDA04E95C88129627787015968C7175466 112227~|~1~|~1~|~01/NFA~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~009EB4A6FCA80B2001D0695BA43F2A803B4AF069 119207~|~1~|~1~|~01/NHS~|~All items of work associated with resurfacing of US35.~|~05 - 4R Maintenance - Resurfacing~|~010A0F47397F214A3FB860F0F770F53350BED00A 119207~|~1~|~5~|~05/S5K/WCH~|~All work associated with SR 753 from SLM 11.65 to 12.58 and 13.11 to 14.44.~|~05 - 4R Maintenance - Resurfacing~|~E717AA1A25548E81DA3A39AF12772031C50EC2B4 119207~|~1~|~2~|~02/S5K~|~All items of work associated with the resurfacing of US 22 and SR 753 all portions outside of City of WCH.~|~05 - 4R Maintenance - Resurfacing~|~4C5E0F54DD7708AC3AAE8E82EC37D3C89F1FE134 119207~|~1~|~4~|~04/STR~|~Resurfacing cost associated with US 62 from 0.00 to 3.25, SR 665 & SR 207 ~|~05 - 4R Maintenance - Resurfacing~|~B41A4BAEF27F30FF9627E0E55C81D17974BB8FEB 119207~|~1~|~3~|~03/S>2~|~All resurfacing costs associated with US 62 from 3.25 to 5.64.~|~05 - 4R Maintenance - Resurfacing~|~B841A144F13F2BE81049F7BF4475F7E7DBB09748 99473~|~1~|~1~|~01/BRO~|~CEAO funded bridge replacement, 80/20~|~10 - Bridge Replacement~|~81420501BC03B9CC4D53A0DAF2369CDB31045682 118541~|~1~|~1~|~01/NFA~|~NOB CR 56 South Access~|~04 - Reconstruction - No Added Capacity~|~D5A7BA696FD90A84EC4CF43CC79DE3060CE09B82 118541~|~1~|~2~|~02/STR~|~Concrete Pavement Repair on NOB SR 78 7.08-7.18. Funded 100% State.~|~04 - Reconstruction - No Added Capacity~|~CF5EB6D50209038CCD4A3A2AF0BD36A30C9064F3 91854~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1601563 COS SR79 8.34 Intersect: Mohawk Crk #; BR Eligible for Rehabilitation: Length=43 SD/FO(1) SR=39.3 DSR=5~|~~|~6928564336F7EF7B4EA24052AFD1A6DB9851CD7B 91854~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 1601598 COS SR79 9.55 Intersect: Tributary of Mohawk Crk #; Not BR Eligible for Rehabilitation: Length=49 SD/FO(0) SR=60.1 DSR=5~|~~|~8444267D482D2DD15FE21C248346D56D566F2E3A 101085~|~1~|~1~|~01/BRF~|~Federal funds from the Municipal Bridge Program with the non-federal match provided by the City of Van Wert. Use of Toll Credit approved to raise the federal percentage from 80% up to 95%~|~10 - Bridge Replacement~|~23FEE2065BF9F793FB21AA098C5D09251FF8EED1 114013~|~1~|~1~|~01/SAF~|~ROS CR VAR GR FY26.~|~21 - Safety~|~46351D62D05287D46ABA1979325920D4ED371AED 114909~|~1~|~1~|~01/NHS~|~Construct noise walls.~|~20 - Environmental Only~|~A0C406784F240BC8D1525E37D9E1713B6E10C5C6 123522~|~1~|~1~|~01/NFA~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~889CE02F0A159F8DA46C7BD2E093C328008602FC 92578~|~1~|~1~|~01/STR~|~0.1 Miles North of Felcity Cedron Road. Repair slide on east side of roadway. Slide was part of the ER funding program and was separated out from CLE-133-0.58 PID 91121 as a separate project.~|~04 - Reconstruction - No Added Capacity~|~1444FC8272C84CF076AE1820282EEA1B036BD359 102574~|~1~|~1~|~01/ERD/MCEO~|~"01/E&D/BR/MCEO" - FHWA Accelerated Innovation Deployment (AID) Demonstration Grant OH-FY15 4D57 (Federal 80%) / LNTP (Local 20%)~|~10 - Bridge Replacement~|~6DB475825DFDAF4B9F67B10EBF608CE3845B365A 118906~|~1~|~1~|~01/STR~|~Resurfacing SR 516~|~05 - 4R Maintenance - Resurfacing~|~0912EBA138A0A5FCDBB459B247458BEECED83EA3 103823~|~1~|~1~|~01/NHS~|~Bridge repair on NHS route.~|~13 - Bridge Rehabilitation~|~34491BE80CAB18871B7A72D541FCCA5798F65990 103823~|~1~|~2~|~02/STR~|~Bridge repair on rural route.~|~13 - Bridge Rehabilitation~|~8320F2298587460EA8E855D1C9F223774A2C9F08 91937~|~1~|~1~|~01/STR~|~BRO US50 8.03 Culvert replacement On US50, project is 0.34 mile west of the Highland County line. It is proposed to replace the culvert at SLM 8.03. 80/20 split01/STR/OT/State~|~44 - Other~|~D6D65CF6239FCA6D403699B72657746411380D06 114218~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span.~|~~|~A51333A7C81635F2A4ADD35EFC4DCB25116CC9C1 106545~|~1~|~1~|~01/S>2/LOUI~|~Resurfacing, urban paving in the City of Louisville.~|~05 - 4R Maintenance - Resurfacing~|~64034C8B1449D40C4324E8F2C5EA559938770A74 106545~|~1~|~2~|~02/S>2/LOUI~|~100% Louisville items such as full and partial depth repairs and ADA curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~95F2C78714B93D5FB6E95E0383466B6D96FF3334 98141~|~1~|~1~|~01/NHS~|~Bridge repair and rehabilitation on three structures. US 23 mainline over US 36, NB off ramp over Delaware Run, and SB on ramp over Delaware Run~|~13 - Bridge Rehabilitation~|~98C8F12A594C61554F3459D0501B6922CD2D01E7 98141~|~1~|~2~|~02/NHS~|~Rehabilitation of wall adjacent to NB off ramp rehabilitation and resurfacing of the ramp from the gore to the bridge deck.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BF64FB733D8EE844CD5D6894EE197501C8A63ABD 98141~|~1~|~3~|~03/NHS~|~Enhancements to the wall face funded by the City of Delaware (100%)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2C4C09116374AABF053E529ECE876B53851ED0BB 98141~|~1~|~4~|~04/S>2~|~DEL-42 ? pave invert of steel culvert over Sugar Run, repair stone wall, upgrade guardrail. ~|~13 - Bridge Rehabilitation~|~2FE8A4DBF60DE97E8EB61471416E81C3720A7B1A 98141~|~1~|~7~|~07/NHS~|~Costs to repair damage caused by vehicle accidents~|~13 - Bridge Rehabilitation~|~E18328FA14F418825FC63FD7CFE1B34E7FD967CD 98141~|~1~|~5~|~05/STR~|~Purchase pipe to be used on the emergency project~|~04 - Reconstruction - No Added Capacity~|~487F07B8D8CEACF8D3F2621475D494C40102FEA1 98141~|~1~|~6~|~06/S>2~|~Emergency repairs due to spring flooding~|~04 - Reconstruction - No Added Capacity~|~913E0E5E441A2AE8C5C60F2C7116EDF0848A56E1 97299~|~1~|~1~|~01/NFP~|~Plan split for mowing along the interstate routes with 4CP7 funds.~|~44 - Other~|~D1A1AB6577711FC589DF929A68EF50A7E40A3D6B 94565~|~1~|~1~|~01/NFP~|~Herbicidal spraying of various routes in Trumbull County, Ohio.~|~44 - Other~|~38F1503FA47D8789FB1094E243CB128CE8526800 93884~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 6.23, SFN 3701174. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~DCF2FBBA7B5DD92F314E075D9940291A36F21342 99640~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~1BB4F04EEE76B26AFE1889916B31AE5357601FFB 91858~|~1~|~1~|~01/NHS~|~Resurfacing a portion (SLM 2.69 - 6.74 ithrough the Village of New Richmond) of US 52 in Clermont County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~094CA558FF58FCC9931212C871C5C5A255EAB429 124672~|~1~|~1~|~01/STR~|~Resurfacing project on MOE CR 81 1.07-2.33.~|~05 - 4R Maintenance - Resurfacing~|~ABC4F35F214BB96AAF4F449CEDCC0EAF33ED68AF 118608~|~1~|~1~|~01/NFA~|~Split 1~|~17 - Construction Engineering~|~782404EE1CC6115A1E2F1274A602A4067B368F70 118701~|~1~|~1~|~01/STR~|~GAL 160-1433 750 ft rockfall hazard remediation. 450 ft landslide repair with drilled shaft wall beginning at the 14.38.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6F1D624922B8F0A61E70A06DFEF9654C3B279DBD 117625~|~1~|~1~|~01/SAF~|~CLE-222 PID 125645 construction inspection/engineering ONLY~|~17 - Construction Engineering~|~C5F1B53633944F3AD4432F00EE511B3FE0CBE36D 105218~|~1~|~1~|~01/STR~|~For all costs associated with associated with the rehabs of CLI-73-1522 and CLI-230-0827~|~13 - Bridge Rehabilitation~|~926F93BFC3BE7811CC6F67D75FD9CCF49E089B57 107961~|~1~|~1~|~01/MPO~|~Resurfacing of Sanitarium Rd in the Village of Lakemore.~|~05 - 4R Maintenance - Resurfacing~|~45F028FEA610049F992008FC5EBB4B1F09FF6777 83705~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using a double-microsurfacing treatment. GAL US 35 0.00-3.79. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~6B55E6D0B4DE54D858E9648270BA23C9B9CF4118 117522~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 2001 0.13, SFN 5630290.~|~10 - Bridge Replacement~|~2ABC6F9EB8C5F19673264B3563CBD0BA52205FA4 96723~|~1~|~1~|~01/NFA~|~Trumbull County Warren Outpost, convert current barn into Coverall Cold Storage by keeping existing walls and removing roof. Demo old building and build 500 ton material storage bulding~|~~|~DEA5BD6B274E61657123F24CA24D80D4CD8225F1 99837~|~1~|~1~|~01/CMQ~|~Reconstruction of Montgomery Road (US-22/SR-3) between the Norwood corp. line and Silverton corp. line. Existing sub-standard typical section will be revised to provide 5 lanes (two through lanes in each direction with peak hour restricted parking and a center turn lane), per an ODOT 2009 safety study recommendation. Traffic signals in the corridor will be upgraded to 12" LED signal heads with countown pedestrian signals.~|~21 - Safety~|~ECBCAA07A4AD6C06E1634CCFD6F00865075935AB 86327~|~1~|~1~|~01/ENH~|~Rebuilding and widening existing sidewalks, new sidewalks wehre missing, installation of decorative pedestrian lighting and landscaping on East Stroop from the East side of Shroyer Road intersection to the West side of the Royal Oak Drive intersection. MOT CR 609 from SFL 0.510 to 0.710.~|~28 - Facilities for Pedestrians & Bicycles~|~86149881B42EFC9F6D63EDF20E76C3030CC92194 127096~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~B684BB9E7359E2AD37CAED5F067B498195FFB29E 100742~|~1~|~1~|~01/SAF~|~Construction of a Northbound left turn lane on State Route 44 at Enterprise Parkway, including adjusting driveways at gas station. In the City of Ravenna, Portage County, Ohio.~|~21 - Safety~|~9CD49A01AC7790DC5F306641DEFEC354499BCA2A 100742~|~1~|~2~|~02/SAF~|~Reconstruction of signal at State Route 14 and State Route 44 intersection.~|~44 - Other~|~6255A726C8E6A889ACC43BBE0C77F63B120486D7 91411~|~1~|~1~|~01/STR~|~Brdg replacement. East of Adams County Line on SR125. 7303289 SCI SR125 0.73 Intersect: Rocky Fork80 Fed/20 State. 01/STR/BR/State~|~04 - Reconstruction - No Added Capacity~|~91D21A697EAAA34FB094585880C7F888C58234D8 96359~|~1~|~1~|~01/SAF~|~Improvement of Waterloo Road / Arlington Road intersection. Includes the removal of right-turn slip ramps, and extension of medians. In the City of Akron, Summit County, Ohio.~|~21 - Safety~|~7AAF88659807312788148F7F37850FED83474510 114524~|~1~|~2~|~02/STR~|~Asphalt on LAW 775.~|~05 - 4R Maintenance - Resurfacing~|~02B64A3D3BEF71BC64F1F9BBE780258619D22F9F 114524~|~1~|~3~|~03/NFA~|~Asphalt on LAW 217.~|~05 - 4R Maintenance - Resurfacing~|~E1446AC254D14A373EA9656EAFDA4F4D2E37F502 114524~|~1~|~4~|~04/NHS~|~Paving on approach slabs to correct smoothness from LAW-7 (6.87-6.90) and from (6.94-6.97)~|~05 - 4R Maintenance - Resurfacing~|~64FAED5FD97C7E97C9BF304904A0F9C657D45AD2 114524~|~1~|~5~|~05/STR~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~3DEF444D4E23B6E5D4C1962CA8E4AAD79BD5C66A 114524~|~1~|~1~|~01/S>2~|~Asphalt on LAW 775.~|~05 - 4R Maintenance - Resurfacing~|~8BB4408B6FF9FBC7BE84987836E1E7D8C59A4D1A 113334~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (100% State - No CAP - Project to repair and replace damaged Guardrail District Wide~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DC21F65613FC8D75557412BB05726179BA2FDEF4 88739~|~1~|~2~|~02/SAF/ASD~|~100% City of Ashland Water Work~|~21 - Safety~|~1A2811CAE3CF72A70D5B8F9811AB889317890382 88739~|~1~|~1~|~01/SAF~|~Reconstruction of 0.8 miles of US 42 and replacement of existing grade separated intersection with SR 96/US 250 with an at-grade signalized intersection. Widening and resurfacing of SR 96/US 250 to accomodate the intersection improvements. Bridge widening and culvert work to accomodate the intersection improvements.~|~21 - Safety~|~1F9924166FDB34F92F504002537B194AAC9D9EF3 114551~|~1~|~1~|~01/NFP~|~All culverts are under one split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~507C49819365B1450B171D0FF58C6C456487B820 108070~|~1~|~1~|~01/STR~|~General plan split. Will add more specific splits once locations have been determined.~|~05 - 4R Maintenance - Resurfacing~|~99B82CA4A27CDA9D1C0E389B3372D006D176D235 109365~|~1~|~1~|~01/NFA~|~ODNR Sponsored culvert replacement~|~04 - Reconstruction - No Added Capacity~|~409D0163CFB331407F1576C2C6906D99E99134DB 102708~|~1~|~1~|~01/IMS~|~Bridge Deck Replacements: LOR-IR-90 11.530 (L) SFN 4704398 OVER LOR-54-0514 TH-54 Major Rehabilitation ? Deck replacement (004) LOR-IR-90 11.530(R) SFN 4704371 OVER LOR-54-0514 TH-54 Major Rehabilitation ? Deck replacement (004)~|~17 - Construction Engineering~|~AC5B552859E53BB0C288398049DA80695334A35E 91849~|~1~|~1~|~01/STR~|~General System preventative maintenance paving on various routes~|~05 - 4R Maintenance - Resurfacing~|~94BC0BBDEA3DEF5094ADB664338B8FAE5C907CFF 96385~|~1~|~1~|~01/SAF~|~Sidwalk improvements on Ludlow from Maple to Broadway (US36), Chestnut from Ludlow to Debra including curb extensions and enhanced crossings in front of the Elementary School and north side of Broadway from Stevens to Owens with RRFBs at crossing at Stevens St.~|~21 - Safety~|~DF8AAEAF22037A14E1A7006282D533EB0F669B16 102826~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7 (100% State) - No CAP - For district wide mowing contract~|~44 - Other~|~EA5FE406EF90C1517D559B7F2C4FD96C74F4F96A 76437~|~1~|~3~|~03/S>2~|~Replacement of waterline/sanitary belonging to the City of Barberton. City owned utilities outside the city limits. Coventry Township, Ohio.~|~43 - Utilities~|~3874B1B6B92BF0702311C2F6A91F68E546E9E66D 76437~|~1~|~2~|~02/S>2~|~Replacement of waterline/sanitary belonging to the City of Akron. City owned utilities outside the city limits.~|~43 - Utilities~|~AADDF7D5B4730ECE176EBE501ADE4209339C7D37 76437~|~1~|~1~|~01/S>2~|~Widen State Rpite 93 to five lanes at the intersction of Robinson Avenue, improve intersection with addition of dual eastbound left turn lanes and additional travel lanes. Widen Northbound to Cormany Avenue.~|~21 - Safety~|~DC070818306C7E86622047B8FF3B65A382E64E8A 100982~|~1~|~1~|~01/NHS~|~DSR# JEF-002~|~04 - Reconstruction - No Added Capacity~|~F07EE6DFAA0DABCC90CDEE4897293ED8F362036B 86457~|~1~|~1~|~01/NHS~|~Work associated to the following locations: BUT-4-2461, BUT-4-2475, BUT-4-2570 and HAM-127-1213 ~|~47 - Bridge Preventive Maintenance~|~64ECDE6DC3FB3C4BE418A34B13AC52B33B2449D9 86457~|~1~|~2~|~02/STR~|~For costs associated with the following locations: CLI-380-0110 WAR-132-1056 GRE-380-0149 PRE-177-0468 BUT-126-0037 BUT-732-0099 CLE-133-0331 GRE-68-0118~|~04 - Reconstruction - No Added Capacity~|~AB72C9EBEBBEBF689E3F5B89062769C562CA1937 86457~|~1~|~4~|~04/IMS~|~For costs associated with HAM-71-0872.~|~04 - Reconstruction - No Added Capacity~|~C4F8D262E622B36941C3CA32470947B95E208A78 86457~|~1~|~3~|~03/S<2~|~For costs associated with location WAR-123-2563.~|~04 - Reconstruction - No Added Capacity~|~E12DD934DC679709EBE9CB3FA00DC3599964529B 93121~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~DFF0D350A21610DFE75E4D95FA8002912AC0B343 93121~|~1~|~2~|~02/S<2~|~District Allocation - Urbanized~|~05 - 4R Maintenance - Resurfacing~|~E98A5360774116526EC0704DE6BBB2941701A416 93121~|~1~|~3~|~03/STR~|~SFN 7005474 RIC-96-16.57SFN 7007213 RIC-603-13.57~|~47 - Bridge Preventive Maintenance~|~B0BA5F00DE671BA7E7670A0872E9572B154C0D21 93121~|~1~|~4~|~04/STR~|~Hauling Grindings~|~05 - 4R Maintenance - Resurfacing~|~0510559738852EF1634B5578F83644B5A01DC358 121085~|~1~|~1~|~01/NFP~|~PM FY2030 plan split.~|~21 - Safety~|~B57E13C7B67595509B407F5C75757C15863F055F 116952~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9DA199A50AE994ACFFBA111976AAE10B273BB2FB 108038~|~1~|~1~|~01/STR~|~Bridge Replacement~|~04 - Reconstruction - No Added Capacity~|~100FEA76C44D4F00E558DAA5EF9DD6BA46190448 116687~|~1~|~1~|~01/SAF~|~Primary plan split, Federal eligible items~|~21 - Safety~|~C879A4BE75322398B6D5CF33C39648B1DCE2F3F5 86081~|~1~|~1~|~01/MPO~|~Road extension~|~~|~02B73F61661DE22C21FAD5611683A7C8842BB770 84551~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 550 0.00-10.56. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F8FD228005D09CC936D6EF98A3FB0C4CD6476D84 84551~|~1~|~2~|~02/SAF~|~Safety funded sidewalk improvements. Addition of curb and sidewalk between Yeager Road and the convenient store. Bulb outs at State Route 555 intersection and the Yeager Road intersection. ~|~05 - 4R Maintenance - Resurfacing~|~95C2FD03B59211F5637761ABD61CDCAE8B367A0C 99743~|~1~|~1~|~01/MPO~|~For work on the multi-use path.~|~44 - Other~|~C9348719C9AF4EDC789BB1E28A2582DCFED9D571 116343~|~1~|~1~|~01/S<2~|~Resurfacing SLM 5.58 to SLM 9.501~|~05 - 4R Maintenance - Resurfacing~|~5CE9D4A8848101767482632137D187B79D2544C4 116343~|~1~|~2~|~02/STR~|~Resurfacing SLM 9.501 to SLM 11.07~|~05 - 4R Maintenance - Resurfacing~|~6FF8FDBE7D6F53B7A1ED9A2C923E88C807BF8E27 95067~|~1~|~1~|~01/IMS~|~Plan split for all work for this project~|~44 - Other~|~426139857377789F419F4D198B006BF36856A3FE 103129~|~1~|~1~|~01/MPO~|~Installation of bike racks at city facilities using MPO TAP funds @80% federal participation with 20% local matching funds.~|~~|~0BE8E8289449E19C62AC96B2F23685964114EA49 106082~|~1~|~2~|~02/S>2~|~100% City of Columbus Items~|~05 - 4R Maintenance - Resurfacing~|~C435777DEE70ECD7839B12F297CCF596DB1236C7 106082~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-62-12.44-13.50 FRA-62D-1.61-2.20~|~05 - 4R Maintenance - Resurfacing~|~7B00C4C17EAEDF18AEB3FBD45B6EB53C6B68868F 102575~|~1~|~1~|~01/NFP~|~Outpost Facility in Ottawa Co.~|~01 - New Construction~|~FDB795C91F524216DE997F2E3D3ED799FEDFD03D 101053~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~208A1FC2ADF11841E8CDF9B90E16E9319A0B1461 112627~|~1~|~1~|~01/MPO~|~Resurfacing of Park Ave from South St to Ivanhoe St in the City of Warren.~|~05 - 4R Maintenance - Resurfacing~|~274016813447BB79F22410FA92893985A84B8C2A 98200~|~1~|~2~|~02/NHS~|~Work on structures SR 315 SB over Sullivant Ave (SFN 2514923), US 62 (Rich St) (SFN 2514982), and US 62D (Toen St) (SFN 2515016) and new bridge to replace the SR 315 SB to IR 70 EB ramp bridge.~|~13 - Bridge Rehabilitation~|~4B3B4845487482DE4BBF52ADF5AD5F24737DA591 98200~|~1~|~1~|~01/NHS~|~SR 315 mainline reconstruction and ramps B4 (SR 315 SB to IR 70 WB) and ramp B5 (SR 315 SB to IR 70 EB) and SB on ramp from Town St~|~04 - Reconstruction - No Added Capacity~|~B695DFD7A16BE4EC2B11F4DC2C4276416C4FF3F9 103046~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 26 22.06, 100% State funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5004A396C1BE9DB714CECB7FCF1E01E09F3297EE 121622~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 7 28.19, CFN 1831158. NHS route funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~C7C425EE3BDE5CB5C330E71A7DEEC4D6BDEFCC9A 115624~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~00B01C57B50802C0AF9FF2496B80F4A89D260714 106402~|~1~|~1~|~01/STR~|~Add turn lanes on US62/SR3~|~21 - Safety~|~61FE7A4E34BF2D524D1516D6D5EF1C05839FE118 116085~|~1~|~3~|~03/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~11E219BF110EC73DC95574BA30B38090893F0F0E 116085~|~1~|~1~|~01/S5K~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~7AF1270473848CF440C0FCCFBE84C61DC540FA1B 116085~|~1~|~2~|~02/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~2A4FAC306730F9E1A61409079453D9A358F29953 107215~|~1~|~1~|~01/ENH~|~Install new sidewalks along Genesee Ave in Howland Township.~|~28 - Facilities for Pedestrians & Bicycles~|~5A30396EBC74E8FF17035876E25A18AE08ABB40B 100713~|~1~|~2~|~02/IMS~|~Widening for additional lane.~|~03 - Reconstruction - Added Capacity~|~1CF88B8FB902F078ECAAECE04C77E20F3AC3F912 100713~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement.~|~04 - Reconstruction - No Added Capacity~|~548BEBD6F69D90CCC8E2861A6C55D149319F2B27 100713~|~1~|~3~|~03/IMS~|~New superstructure, widening and pier replacement/relocation.~|~13 - Bridge Rehabilitation~|~D4B3C77B976A765047035F6376DB57349FA05383 100713~|~2~|~4~|~04/IMS~|~Reconstruction of existing pavement.~|~04 - Reconstruction - No Added Capacity~|~42029374C0C9464E2A62A1F110823CD794EC5CFB 100713~|~2~|~5~|~05/IMS~|~Widening for additional lane.~|~03 - Reconstruction - Added Capacity~|~FF0C9DE2D0FBA862D31CDA1E99A4DA77C6E9363C 100713~|~2~|~6~|~06/IMS~|~Bridge replacements. SFN 7703570 replaced by SFNs 7703571 and 7703576, SFN 7705859 replaced by SFN 7703572, SFN 7705883 replaced by SFN 7703574.~|~10 - Bridge Replacement~|~8B8C160376303A6E9A23CED112B1B2CCA708C157 100713~|~2~|~7~|~07/IMS~|~Bridge deck replacements and widening.~|~13 - Bridge Rehabilitation~|~AF7FD6C9AA1DD516F4CDE12191BBB320DAE80075 100713~|~2~|~8~|~08/NFA/AKRO~|~New waterline installation along Jason Ave and I-76 paid by Akron.~|~03 - Reconstruction - Added Capacity~|~5FEAF61B806B8EBE063BF828873CA2EB0E6F61E2 122194~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-D~|~~|~7571509D5E1566636A0DB6783F1041DF38914410 122194~|~1~|~2~|~02/NFA~|~NEVI Round 2B I-75-D~|~~|~6685A631668DEBB0E5A8B71C3891F8D97A3BE972 120194~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in construction phase~|~05 - 4R Maintenance - Resurfacing~|~032AC02BE763C9635691851D46693B16147AA3BE 105593~|~1~|~1~|~01/NFP~|~ASD US 0250 10.86 & HUR US 0224 07.75.~|~13 - Bridge Rehabilitation~|~37F345858C498F326E3469340161A7A9F95442F8 100265~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.0M.~|~17 - Construction Engineering~|~BF1CEDEBFD8F0631FC16275085A403C395C1A265 98809~|~1~|~1~|~01/MPO~|~80/20 federal with local mathing funds for elgible work items.~|~05 - 4R Maintenance - Resurfacing~|~A70BBDE4C8296FFE5AC0FEF9324E129E69E7CB0F 111372~|~1~|~1~|~01/STR/PCEO~|~CEAO Funded resurfacing project on portions of Major Collector Routes CR 98 (Ceramic Road) and CR 56 (Jamestown Road) in Perry County - CSTP Funds 4B77 (80% Federal) / 4BG7 (20% Local) - see Cap comments. ~|~05 - 4R Maintenance - Resurfacing~|~59F223E7FEB3A0234F8A3736154D6165C5A94F56 111372~|~1~|~2~|~02/NFA/PCEO~|~CEAO Funded resurfacing project on portions of Minor Collector Route CR 30 (Zion Road) in Perry County - CSTP Funds 4B77 (80% Federal) / 4BG7 (20% Local) - see Cap comments. *Funding for this Rural Minor Collector is contingent upon Congress including the minor collector provision in the next transportation funding bill.~|~05 - 4R Maintenance - Resurfacing~|~80069819D02DA613FF9D60010A257FCAE88C88F9 95417~|~1~|~1~|~01/SAF/ROS~|~It is proposed, using CEAO Safety funds, to install new and upgrade existing guardrail on various Ross County routes. 100% Safety CEAO funds~|~21 - Safety~|~6F34740E7EF2B62DA1FEFE5D30E52923103C8914 105640~|~1~|~1~|~01/NHS~|~plan split~|~~|~1D2EBC46962188B4918110F21F5018A0100A9DDB 95473~|~1~|~1~|~01/STR~|~Widen ATH 13 11.86 and add left turn lane to ATH 78.~|~04 - Reconstruction - No Added Capacity~|~05CE9646C9A26569F88536F13FC72ED12D3E97CD 95473~|~1~|~2~|~02/SAF~|~Widen ATH 13 and add left turn lane onto ATH 78. Other federal aid funded 90 federal safety/10 state safety.~|~~|~74EAF345BE7A845E7A0FB6BD897C0AC73523B879 119865~|~1~|~1~|~01/S5K~|~All Work Included in this Split~|~66 - Resilience Improvement - Highway Project ~|~CED0A62D6D18415292C3EDBC65800BBA13E9FF69 121361~|~1~|~1~|~01/IMS~|~Plan split for all work associated with WOO-280-0339 & WOO-280-0386 bridges~|~13 - Bridge Rehabilitation~|~4B70A9B2BB9A86D0A1A0FC18CA4FF5D50D84455E 112412~|~1~|~1~|~01/SAF~|~Friction treatment and curve warning signs at the following locations in the City of Cincinnati: East Mitchell Ave @ Red Bud Ave, West Fork Rd from Montana Ave to Todd Ave, and Central Pkwy @ Brighton Pl~|~21 - Safety~|~E1F715CF95692D8AF5E603A83460B416FBDC5A01 83824~|~1~|~1~|~01/STR~|~Crack Sealing on the General System for FY2013~|~47 - Bridge Preventive Maintenance~|~42BC51E776E2E86AEB967D6CF1FF76BA5FDC65F4 99860~|~1~|~1~|~01/NHS~|~Raise structure, new deck, conert to semi-integral abutments, paint superstructure and seal concrete surfaces.~|~10 - Bridge Replacement~|~7E7F42E217BAAA6A74D729D2EFCD3BDC55559394 99860~|~1~|~2~|~02/NHS~|~Structural steel repairs due to impact damage over Southbound SR 4~|~47 - Bridge Preventive Maintenance~|~C7323E5E2EBC921E268D4C6D3A8185C0B346D2C1 108096~|~1~|~1~|~01/STR~|~Bridge maintenance on rural route bridges.~|~04 - Reconstruction - No Added Capacity~|~FCFB86CBB49C51EE4E2BA5E65F01FCCB33605330 108096~|~1~|~2~|~02/IMS~|~Bridge maintenance on interstate route bridge.~|~04 - Reconstruction - No Added Capacity~|~6515317459C37D50BB03D9AB6C59BBE3D9E67990 108096~|~1~|~3~|~03/S<2~|~Bridge maintenance on small urban bridge.~|~04 - Reconstruction - No Added Capacity~|~E1D83B5252B540F1A951926F95E07BE9F50630A4 106655~|~1~|~1~|~01/ENH~|~Construct a bikeway to connect the Hockhocking Adena Bikeway with the northwest side of Athens.~|~28 - Facilities for Pedestrians & Bicycles~|~26DCB529574B9640A9F78081EDC0BD7859AF6258 107775~|~1~|~1~|~01/STR~|~Landslide repair project using ER FHWA funds at 100% Federal. ATH 550 17.76-17.81.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~410C2D969648976A8BA91864A4B1F6B58AD43887 122210~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-76-A~|~~|~0724D6FAC5D46EE8D3DF8F07CA181FE21D0BEF96 117385~|~1~|~1~|~01/ENH~|~Bicycle and Pedestrian Improvements (including ADA compliance) at Belmont County Courthouse utilizing TAP (4B37) Federal funds at 95%.~|~28 - Facilities for Pedestrians & Bicycles~|~32CD3009F71202431E8686DF0441155441FDAF9F 117344~|~1~|~1~|~01/BRF~|~Primary Plan Split for Local Bridge Program eligible scope items.~|~44 - Other~|~848E34B01146E9F8FF81E08EF549F5D7CACB9496 114866~|~1~|~1~|~01/NFP~|~Chip seal fund split~|~17 - Construction Engineering~|~B0FCCC732637E08AF117AF34774AC9CF05B1F5A0 23821~|~1~|~1~|~01/IMS~|~Planing and resurfacing of existing pavement wideing u-turns and minor bridge work on Interstate 75 from the Auglaize/Shelby County Line to the junction of US 33; and from the junction of State Route 274 to the junction of the Auglaize Shelby County Line. SHE-IR-75 17.540 to 20.55 AUG-IR-75 0.000 to 4.970~|~05 - 4R Maintenance - Resurfacing~|~C644D1C60023B6C8EEA20CFCFE460DCA5DCA539A 98041~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~44 - Other~|~391C2DFF6712DDB02DBA812A36DB54D97EFD5BF7 121316~|~1~|~1~|~01/NFP~|~Created for TID involvement~|~44 - Other~|~F68F371878DF0DDB97ED9875645ABCB355CCEE63 99589~|~1~|~1~|~01/MPO~|~Resurfacing Elm Road from South Street to SR 5/82 with rubberized asphalt on an asphaltic leveling course. Includes incidental drainage work, ADA ramps; curb, linear grading behind curb and sidewalk replacement as necessary. Also includes new pavement markings and signs.~|~05 - 4R Maintenance - Resurfacing~|~DB67E0A644A749E88DEA58EF44D6C3AE2300466E 119169~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment on HOC 33 4.20-9.47.~|~05 - 4R Maintenance - Resurfacing~|~A85326B9E58F9AAC69001EE779B5E90092D8DFB5 117744~|~1~|~1~|~01/BRF~|~Plan split for CEAO LBR Program eligible bridge replacement work.~|~10 - Bridge Replacement~|~6DF551A6BB1B15866BE556AC390E398D95488594 108922~|~1~|~1~|~01/NFA~|~TAP grant project to restore a covered bridge in Village of Lynchburg.~|~47 - Bridge Preventive Maintenance~|~DFF0A1A685B6914109E97E04D188B56FE98D4E65 112927~|~1~|~1~|~01/IMS~|~DEL-71 from 0.84 to 1.61~|~05 - 4R Maintenance - Resurfacing~|~468EF8393992293F16DBC034811E589B108BB45C 112927~|~1~|~2~|~02/S>2~|~DEL-42 from 11.16 to 12.34 and DEL-750 from 5.5 to 7.06~|~05 - 4R Maintenance - Resurfacing~|~71F027742CF47BA5C3C6155122D5293497A622F2 99478~|~1~|~1~|~01/NHS/NEWA~|~"01/NHS/PV/NEWA" - LCATS CAMQ Funds - 4TB7 (80%)/4BG7 (20%) -CAP = $400,000 - turn lane addition on the eastbound off-ramp (Ramp C) at the SR 16/Church Street interchange.~|~21 - Safety~|~D20178271F2236962D06AFBEE7774F58652503E0 98284~|~1~|~2~|~02/NHS~|~Install Intelligent Transportation System (ITS) Dynamic Message signs on US 33 and US 50 around the City of Athens (4 locations). NHS route funded 100% state.~|~21 - Safety~|~8C668B9B5F5D6BAA20151FF77C2C67CB556ED971 98284~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2018. ATH 33 5.16-11.44, 14.87-19.05, ATH 50 1.74-12.17, 14.81-17.71, 33.15-39.04, ATH 7 2.05-2.86 and ATH 32 0.00-1.42. NHS route funded 80 federal/20 state.~|~21 - Safety~|~8DF72F84E8AF1C9BF614050FCFF5225390A24FC8 121452~|~1~|~1~|~01/STR~|~All work associated with the Rehabilitation of the PRE-40-1116 bridge. ~|~13 - Bridge Rehabilitation~|~BB43D26535EDC79CDDCEC508503A71A0F56EE9E5 119096~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~67BE96105918DD3E800BB604FE2FBDF63E34AFA2 115329~|~1~|~1~|~01/IMS~|~SFN 7502109 - Reface rear abutment, patch edge spalls, abutment corners and wingwalls, encase pier columns SFN 7502133 - Extend forward right scupper, patch edge and railing spalls, abutments, and wingwalls, encase pier columns~|~47 - Bridge Preventive Maintenance~|~D150C6C1E052ED8B6ECCDB7B8E8CE9F4F214F0ED 115329~|~1~|~3~|~03/STR~|~SFN 1201352 - Patch abutment and fix undermining issue~|~04 - Reconstruction - No Added Capacity~|~B00669AF4796B242D57AAC0EA657A95A0AD99E02 115329~|~1~|~2~|~02/STR~|~SFN 1201387 - Patch abutments and wingwalls SFN 4602269 - Patch deck potholes along joint and reseal, patch corners of deck and abutments, seal with SRS, and encase piers SFN 5503973 - Encase pier columns all the way up to the cap~|~47 - Bridge Preventive Maintenance~|~18167275C830B247F4B24C3825DDEB53926FCBF2 117125~|~1~|~2~|~02/S>2~|~This plan split includes all work associated with constructing the shared use path on this project.~|~~|~A7C6A34BD0D2FEDD68D3CA694C6E00C3C169E96F 117125~|~1~|~1~|~01/S>2~|~This plan split includes all work associated with widening Indian Ripple.~|~~|~77CA7CB405ED7463600B29403CE5B469642CCFA1 122100~|~1~|~1~|~01/NFA/MUSK~|~Muskingum County CEAO Federal/State Exchange Programs Funding - 4C87 (95%) / LNTP (5% Local Match) - Replacement of MUS TR 196 01.02 (SFN 6032516).~|~10 - Bridge Replacement~|~D14E04C79464118BD6378DB3A94835F3B968F42C 96312~|~1~|~1~|~01/STR~|~STP Rural. 80/20 Fed/State. Non-BR eligible bridge funds.~|~13 - Bridge Rehabilitation~|~DF11055AEC61749A9C976DE54494208CEABB721B 97468~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~7C7045151F4DE77B73389D36F4AE3B3828A26C58 126087~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~1F1B9CA0AB595FF450667F05D7957FC32B131D8C 118874~|~1~|~1~|~01/STR~|~Resurfacing SR 147~|~05 - 4R Maintenance - Resurfacing~|~3BCD02A31FC4FCA5D9F3DD5193CDC667EB199185 124961~|~1~|~1~|~01/MPO~|~Resurfacing of Hamilton Trenton Road between State Street (SR73) and Edgewood Drive~|~05 - 4R Maintenance - Resurfacing~|~7F67D181464881B3802D229986D58F5CFA76651B 93452~|~1~|~1~|~01/S>2~|~Intersection improvement, SUM SR-91 at Norton Road in the City of Hudson.~|~~|~57C153B731AA97C3E8334AAFE287058D41DDF3CF 122492~|~1~|~1~|~01/STR~|~Roadway rehabilitation and associated improvements utilizing State Oil & Shale funds at 100% up to Program maximum.~|~05 - 4R Maintenance - Resurfacing~|~C1C1E75BA237B57610A47EC9C638AD41D80E7F1B 124500~|~1~|~1~|~01/STR~|~Work on SR 98 to raise profile and replace bridge~|~04 - Reconstruction - No Added Capacity~|~2C82FCC7AB40E6FFFEE84A6524D383F76E9FFBC0 119952~|~1~|~1~|~01/SAF~|~Plan Split for Safety funded scope.~|~21 - Safety~|~A253467C5B648AC01CAC87247FC7C7584B1283FD 119952~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded costs for Alternate bid items.~|~21 - Safety~|~AD44B17833C9801D5AFA394914AE4A62FC7AC5D0 95403~|~1~|~1~|~01/MPO~|~Bridge replacement at two locations along Rockside Road (CR-53) utilizing MPO STP funds @ 80% Federal and 20% Local match.~|~10 - Bridge Replacement~|~9A9D09CD63269EB72C1177D161A386A19E1BF48D 95403~|~1~|~2~|~02/NFP~|~Plan split for non-eligible items at 100% local cost.~|~10 - Bridge Replacement~|~24486F1ACCABD3ED0C761F400B328B74109A6E13 95318~|~1~|~1~|~01/CMQ~|~Improvements to the existing intersection of SR-73 and SR-741 in Springboro including installation of a dual left turn lane from eastbound SR-73. Auxiliary right turn lanes will be added on east and west approaches of SR-73, a raised concrete median will be constructed along the dual left turn lanes to provide access management at the intersection, necessary upgrades to the existing traffic signal, and various enhancements to the intersection.~|~21 - Safety~|~E83779347B0443F5CDA216F1666B3F08EBF7C0D8 94331~|~1~|~1~|~01/STR~|~Plan split for resurfacing on FUL-20A, FUL-109 & FUL-127~|~05 - 4R Maintenance - Resurfacing~|~D8C0E7E93F88FD8D67DF8E1E87C84AB306D2ADC7 94331~|~1~|~2~|~02/NFP~|~Extra Work for Loves Travel Stop~|~05 - 4R Maintenance - Resurfacing~|~BF0B2DD84A832C9630C194DA8F8EB5BA8998504B 103392~|~1~|~1~|~01/CMQ~|~Construction of a sidewalk along Montgomery Road from Dearwester Drive to the existing walk approximately 375 feet south of Pinehurst Lane.~|~28 - Facilities for Pedestrians & Bicycles~|~D0145BDB703709F56D8779514A1DE0718E511369 122857~|~1~|~1~|~01/MPO/WARR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~68D997231F71358BDDF6B1D830DCF42EE3A7B65C 101286~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C03C0DC55580A118EADE7B14447C8CDEAD0F7811 112637~|~1~|~1~|~01/STR~|~AC Overlay with Repairs ASD-511-22.98 to 27.639 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~6B7EFA5F336AF4614A4A82E23317BBB283F2BD19 94156~|~1~|~1~|~01/IMS~|~Extrusheet replacement project in FRA county No lcoations given at time of programming, mostly interstate~|~21 - Safety~|~A6702646B055B318721A6C31D5BFADA54DBC09EC 104980~|~1~|~1~|~01/NHS~|~Plan Split for bridge FRA-315-11.66~|~13 - Bridge Rehabilitation~|~653FA30D966B48BD8CDFBB9D5AFD8EF72A64DE63 108546~|~1~|~1~|~01/STR~|~ER Event OH18-01. Landslide repair project. MRG CR 3 4.34, DSR MRG-003. Rural other federal aid funded 80 federal/20 local ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~32F06E4F52A97A6B5348E785C0E94175791B0E39 103265~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers.~|~21 - Safety~|~893C9BED1FC7F16C6DFEB5DF30AC7B47C59F3637 90595~|~1~|~1~|~01/SAF~|~RPM replacement project using CEAO funds. 100% Federal. Various routes and sections in Gallia County.~|~21 - Safety~|~9567DACE1154A69B73C19412A23A1A665C80D24D 97623~|~1~|~1~|~01/BRF~|~Replace MRW-TR 161-0.25 (Phillips Rd) structure over Alum Creek SFN 5931622~|~10 - Bridge Replacement~|~0C0F41ECA1E245771CFFC6D13801118CBABAD349 97623~|~1~|~2~|~02/BRF~|~Replace MRW-TR 166-0.28 (Pompey Rd) structure over Turkey Run SFN 5932238~|~10 - Bridge Replacement~|~AE9B9323938BBA522139FCBF33EA97596058D5C4 97623~|~1~|~4~|~04/BRF~|~Replace MRW-TR 21-5.88 (Prospect Mt Vernon Rd) structure over Alum Creek SFN 5932440~|~10 - Bridge Replacement~|~E6772768F68612AB5AE0468A8B21B907E3E00037 97623~|~1~|~3~|~03/BRF~|~Replace MRW-TR 191-0.00 (Bennington Harmon Rd) structure over Big Walnut Creek SFN 5930634~|~10 - Bridge Replacement~|~EE4BC462F6BCBD53F31557BDA37BB6814640081B 111391~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB SR 146 13.17, CFN 1827699. Rural other federal aid funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~968EB77627674226E741DF741F36489150192E24 112261~|~1~|~1~|~01/SAF~|~Pavement markings on various county routes.~|~21 - Safety~|~A69A988A9D60505EABA16789C11C0DA059E1E900 112573~|~1~|~2~|~02/SAF~|~100% Locally Funded Work- Traffic Signal Connectivity ~|~21 - Safety~|~23D7DAF3A1A11E7D64A484EF9F581A47758D019E 112573~|~1~|~1~|~01/SAF~|~Road rechannelization, signal upgrades, median construction, and all work not 100% locally funded. ~|~21 - Safety~|~C5549F80A2595FA5879750000FC37D6A0D6937EB 123311~|~1~|~1~|~01/STR~|~Resurfacing of approximately 3.56 miles of CR44 and 2.45 miles of CR16~|~04 - Reconstruction - No Added Capacity~|~F9E848703BE4C1485E98188CA89A9092656D620A 100816~|~1~|~2~|~02/CMQ~|~Sidewalk on the bridge and approaches.~|~28 - Facilities for Pedestrians & Bicycles~|~D17B9C71F838A4D79D1FC5DCA846E32AC80737F1 100816~|~2~|~3~|~03/CMQ~|~Construction of a new section of the Lebanon Country side YMCA trail between the current terminus at Deerfield Road and East Street along Deerfield Road and ultimately tying into the City of Lebanon Bike Park on the east side of Bypass 48, along Turtlecreek Union Road.~|~28 - Facilities for Pedestrians & Bicycles~|~76E908A902DB493C2B0C9C070DCE23BCD39F71E5 100816~|~1~|~1~|~01/S>2~|~Rehab bridge by replacing concrete deck. This split includes a base estimate for VPF as well as VPF alternate bid items.~|~13 - Bridge Rehabilitation~|~4A156F302B91A18DB018D93EB7141E72ED645179 100816~|~1~|~4~|~04/NFP~|~Retroactive fuel price adjustment~|~28 - Facilities for Pedestrians & Bicycles~|~E641DD9C0ED8B104E57E2A19DFA8B95C78F35F39 76705~|~1~|~1~|~01/IMS~|~rehab LUC IR280 0-2.07~|~04 - Reconstruction - No Added Capacity~|~898206154BADA4D586F27B7531E400B4FBA7795D 119199~|~1~|~1~|~01/NHS~|~Traffic Signal replacement at LOR-2 and Baumhart Rd ramps.~|~21 - Safety~|~F1A80A094DFA4524DE80390D7E07F855F2D96064 119199~|~1~|~2~|~02/STR~|~Traffic signal replacement at LOR-58 and LOR-303 intersection.~|~21 - Safety~|~253BE7C15384708D0A60A8F87CDCBF4FCE7CD86A 115180~|~1~|~1~|~01/S>2~|~Culvert invert paving at DEL-257-4.89~|~17 - Construction Engineering~|~5F955B0938745D738515B2EFC41FA1ABCDF277F6 115180~|~1~|~2~|~02/NHS~|~Bridge replacement on SFN's 2509490 and 6501028~|~10 - Bridge Replacement~|~C1F7B1E670F9908852D46B555440A11371201DDF 115180~|~2~|~3~|~03/S>2~|~Bridge replacement for SFN 2103036~|~10 - Bridge Replacement~|~4F00B36D8EA6D05170CBA31B30DC38836B3CCCF6 115180~|~3~|~4~|~04/STR~|~Bridge replacement for SFN 5902878~|~10 - Bridge Replacement~|~82D377F86D30177860FF6B4AAED8208D3F9A5569 101947~|~1~|~1~|~01/S<2~|~Replacement of structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~F014760551A4FDBFB9E258908DCE8C05C321C4B4 101947~|~1~|~2~|~02/STR~|~Replacement of structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~C3F54341FB91720F4ACCF265977A7D13F688BC3A 101947~|~1~|~3~|~03/S<2~|~Aqua Ohio water line stabilization during bridge construction.~|~43 - Utilities~|~28C930ED3BC38562D0D29372A19E1E619EA8D002 107947~|~1~|~1~|~01/SAF~|~Plan split for traffic signal work~|~21 - Safety~|~43ADA284AB53E7BF3308F242B3626D166E4997F3 85412~|~1~|~1~|~01/ERD~|~Plan split for all work using earmark funds.~|~30 - Scenic or Historic Highway Programs~|~A3436A779C3FC512A7F4EF0BF25A6F771B9100B5 113489~|~1~|~1~|~01/SAE~|~SRTS Funded Plan split~|~21 - Safety~|~1C8D4551FDF5E1CE06BBE670D4D34998EA53BCB8 115515~|~1~|~1~|~01/BRF/KCEO~|~Knox County Engineer's CEAO LBR Funds - 4B87 (Federal 80%) / LNTP (15% Credit Bridge) / LNTP (5% Local Match) - Bridge replacement of SFN 4236580 using the CEAO LBR Program~|~10 - Bridge Replacement~|~0175C9D17944D06E0D6D94611CFC2B0FF8098DC7 115515~|~2~|~2~|~02/ENH/KCEO~|~Plan Split utilizing TAP Funds for environmental commitments for bridge demolition. ~|~10 - Bridge Replacement~|~6AD6EB58C7BA080DAEE7AFA90683F400C243DE9B 118876~|~1~|~1~|~01/STR~|~STP plan split.~|~05 - 4R Maintenance - Resurfacing~|~B3E778D623608FEC9956360674B9F101D4DDE2A5 113742~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~C4E89389DF0EA136EAF7676BD8327A9D1E433077 21640~|~1~|~1~|~01/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on selected Interstate route~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~218AB21191B08FD74060926AF5A73D0D973B79D6 21640~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Structure Repairs with related work on selected Interstate bridges~|~47 - Bridge Preventive Maintenance~|~455F60C00CF760C556B28676EEA9B191D9831262 21640~|~1~|~3~|~03/S<2~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Structure Repair with related work on selected bridges on OFAH-Urban routes~|~47 - Bridge Preventive Maintenance~|~FDB1AA498F5C51596899C747B81F885DD04A231E 89446~|~1~|~1~|~01/STR~|~Loop Detector Repair~|~44 - Other~|~42293ACCFFC5C45B4EF98BDAE27C00B3AE50B441 119906~|~1~|~1~|~01/STR~|~Project to address flooding location by improving drainage and realigning vertical roadway profile at MEG 124 9.20-9.43. Funded 80% federal Protect/20% state.~|~66 - Resilience Improvement - Highway Project ~|~AC1017745BFFD15B77FB73D10AAE089E86800892 122118~|~1~|~1~|~01/STR~|~Plan split for federally eligible design build costs~|~10 - Bridge Replacement~|~178C3A124019D61EF839ADDAAA4C9691A0EE2CF6 122417~|~1~|~1~|~01/IMS~|~Plan split for sign repair at various locations~|~21 - Safety~|~62A4F93A28A0B5CE026998C6B0C5B97B6858643E 85017~|~1~|~1~|~01/MPO~|~100% City funded prior to MORPC funds being used per transferring funds agreement~|~03 - Reconstruction - Added Capacity~|~F9A279A28590E78BCC9392D607F90F887F32B14A 85017~|~1~|~2~|~02/MPO~|~Reconstruction and widening of Alum Creek Drive from Refugee to Frebis, known as Part 1 (3105E)Local Sponsor - Columbus~|~03 - Reconstruction - Added Capacity~|~9503DB6B0A0098DF4FD3618575EAD63D57CA8391 85017~|~1~|~3~|~03/MPO~|~DOP, known as Part 2 (3277-E)~|~17 - Construction Engineering~|~EE185A08D2B4749657E577488CD1C7C6EF4952FF 85017~|~1~|~4~|~04/MPO~|~On-going Engineering Services provided by Prime~|~17 - Construction Engineering~|~4971A8118647619A89966B6568710F3ADECDAD6B 121572~|~1~|~1~|~01/MPO/GREE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5D0D437E8E40D8BBAA6BA2C84A23F79527507DE9 79746~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4F28040C7BE3CA6A44563D3AEB359DE0F71771B8 93535~|~1~|~1~|~01/SAE~|~Improve road in front of school with elevated intersections for traffic calming, RRFB signs, curb Bulbs at intersections with Southern Avenue, improved crosswalks, and school zone signing up to code. Bike racks at the school.~|~17 - Construction Engineering~|~0EE9E017A10EA926664D1CAD3D06167900007FB1 101739~|~1~|~1~|~01/STR~|~HIG 62 (6.35-10.38)~|~05 - 4R Maintenance - Resurfacing~|~B69E501CA95410E3984C05AB08B0B9879CF46E6D 121734~|~1~|~1~|~01/NHS~|~Line culvert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~12AF7DDAA4013E40D0FBA9168213AA0F6CFDE650 115996~|~1~|~1~|~01/BRF~|~Replace superstructure.~|~13 - Bridge Rehabilitation~|~74DD4EFDD43E8D1CF6F36BDF27AB202B66197DC4 126085~|~1~|~1~|~01/S5K~|~stp 5k~|~05 - 4R Maintenance - Resurfacing~|~23F92E0DE7F16F92FC94DFA3D7A42EE954D80CBE 126085~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~584E2697B37F83D472099D448F6FF73C9547D8A2 86933~|~1~|~3~|~03/S>2~|~Resurfacing SR 619 from 4.66 to 6.69.~|~05 - 4R Maintenance - Resurfacing~|~3D2205F723EB61021865F991FEA25523F143F027 86933~|~1~|~2~|~02/STR~|~Resurfacing STA SR 619 from 6.69 to 7.36.~|~05 - 4R Maintenance - Resurfacing~|~786151B217D4FB7AD8B7CD22F16E5524BFE3B69D 86933~|~1~|~4~|~04/S>2/HART~|~100% Village items in Hartville, including curb ramps.~|~44 - Other~|~A1668090644402D0BBFE6EB782ED7B36AB6F9845 86933~|~1~|~1~|~01/NHS~|~Plan Split for STA SR 43 19.37 to 25.00 resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C6C6C9A687CE3849BB1F43B89D51DA67D0776003 123957~|~1~|~1~|~01/STR~|~geotech plan split.~|~04 - Reconstruction - No Added Capacity~|~7F7D8E0D77F6AD21BA0EAF2E07D740B71EF597F4 90538~|~1~|~1~|~01/SAE~|~Pavement Markings on various county routes in Stark County.~|~21 - Safety~|~0488C9F65318D6309A4F0B4D1E52316C487551F9 115499~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~4F2ED3EA9CB8EDD9CD229B041345A8A65F17AE43 88619~|~1~|~1~|~01/STR~|~AUG-SR-66 12.870 to 22.410 Resurface the existing roadway with asphalt concrete from USR 33 (SLM 12.87) to AUG/ALL county line (SLM 22.41).~|~~|~B8CB48C10BCB6CA8932DCC3F2A88561663EDF279 117459~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~BF0B2D7D5F78E2ACEC6E279B62F75B7D96419DE1 100870~|~1~|~2~|~02/S>2~|~STA SR 172 0.90 to 2.41~|~05 - 4R Maintenance - Resurfacing~|~E17F4750C46E8A263139DEA16D7854BE0B7B1364 100870~|~1~|~3~|~03/STR~|~STA SR 172 0.00 to 0.90~|~05 - 4R Maintenance - Resurfacing~|~826F2D3A226C3067FD5540FB86A6A8881A8AE812 100870~|~1~|~4~|~04/NHS/MASS~|~STA US 62 10.86 to 11.04STA SR 172 2.96 to 3.03Urban paving in the City of Massillon.~|~05 - 4R Maintenance - Resurfacing~|~868FFEFF8232F3A16086E1B36FA53C2A9BA99ADB 100870~|~1~|~1~|~01/NHS~|~STA US 62 8.50 to 10.86 and 11.04 to 11.54STA SR 93 19.24 to 20.64STA SR 172 2.41 to 2.96 and 3.03 to 3.95 and 8.83 to 11.91~|~05 - 4R Maintenance - Resurfacing~|~7E270E838240F5F2FEB10BECC053594E56B1B148 107787~|~1~|~1~|~01/STR~|~added plan split~|~13 - Bridge Rehabilitation~|~70E8EEAA87A1D4F27BB47A300CA477F9A02848EE 111374~|~1~|~1~|~01/MPO~|~MPO funded item split - Stickney Ave~|~05 - 4R Maintenance - Resurfacing~|~4BF0A8E22170BDEEF00BB8B0A951B9D233EE4748 111374~|~1~|~2~|~02/MPO~|~Plan split for King Ave~|~05 - 4R Maintenance - Resurfacing~|~E1149DE9ECA90D529949EFC9ED4DAC11BAAAA89A 105690~|~1~|~1~|~01/NFP~|~Plan split for all work.~|~47 - Bridge Preventive Maintenance~|~5F361401F6049241CB22B22E084532C8820399CB 119888~|~1~|~1~|~01/NFA~|~NEVI Round 2 13-A~|~63 - Electric Vehicles & Charging Infrastructure~|~75CB1A94961A928736B4489171144A0093D171EE 97322~|~1~|~1~|~01/MPO~|~Updgrade the signal along Mayfield Rd in Cleveland Hts using MPO CMAQ funds.~|~21 - Safety~|~EA3913040C1E033C3027D4BDE81E01FF706C736A 97322~|~1~|~2~|~02/NFP~|~100% local participation for work items not eligible for federal funding.~|~21 - Safety~|~2CCDD56FA6CC3A081C5FD05B9AFFA6A00B656CEC 118737~|~1~|~1~|~01/SAF~|~RPM project in Scioto County.~|~21 - Safety~|~ACA36CA452F76C933B291D313787BA57B8329816 104754~|~1~|~1~|~01/NFP~|~Guardrail replacement on various routes throughout district 4.~|~44 - Other~|~50F5D0780286CD5BB73C5302511C81F3911D1626 101510~|~1~|~1~|~01/NHS~|~Landslide repair~|~04 - Reconstruction - No Added Capacity~|~818F785C87DD597D32D962D1B07F046321A892F3 99993~|~1~|~1~|~01/IMS~|~Split for sealing all structures at 90% federal and 10% state.~|~47 - Bridge Preventive Maintenance~|~9ADD76324E3FE9E213600667A77308B1D39AA324 124020~|~1~|~1~|~01/S>2~|~Asphalt Concrete Overlay with Repairs MED-94-0.00 to 1.149 and WAY-94-21.250 to 21.481~|~05 - 4R Maintenance - Resurfacing~|~0E071B659C6C3A49DAA3660B08DA5243AD487038 124020~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs WAY-94-19.069 to 21.250Includes bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~0D983EF792D1E638BC0714BABA03E37BADED9881 123680~|~1~|~1~|~01/IMS~|~Bridge sealing on Interstate routes~|~47 - Bridge Preventive Maintenance~|~30B6DCB63F9DC1F18C05C2967E42E71303B0218A 123680~|~1~|~2~|~02/NHS~|~Bridge sealing on NHS routes~|~47 - Bridge Preventive Maintenance~|~939E10F35A57F5ACA3917BEBF02696719C15C1C3 123680~|~1~|~3~|~03/STR~|~Bridge sealing on STP Rural routes~|~47 - Bridge Preventive Maintenance~|~3711E480D61F4B1E4835A8A614AB8ED53136796E 93447~|~1~|~1~|~01/IMS~|~Structural steel bridge painting on: SFN 7502168 SHE 75 1007 over CR 45 Mason Road~|~13 - Bridge Rehabilitation~|~11FF0290E683F7188857436AFC3821D5E4669395 93447~|~1~|~2~|~02/STR~|~Structural steel bridge painting on: SFN 1902229 DAR 121 2883 Swamp Creek SFN 5403006 MER SR 219 0233 Wabash River~|~13 - Bridge Rehabilitation~|~B4FB5F085250140E28758E63D8A08F91F7AAAA7F 76693~|~1~|~1~|~01/STR~|~01/STR/PV/ This split uses rural STP funds. The entire project uses this split.~|~05 - 4R Maintenance - Resurfacing~|~CE9630BA3A3D79D48379101AE0C5EB33360D077F 102052~|~1~|~1~|~01/STR~|~Lighting and enhancement inside the Village of Jackson Center.~|~21 - Safety~|~CA6F1DC6C00652F47A6EFDE70CE759D5519539F2 94252~|~1~|~1~|~01/NHS~|~Brdg 80/20 split 01/NHS/BR/State~|~~|~703724ECC46302E4AAC9978CFF7652BBFEE4F280 122332~|~1~|~1~|~01/NHS~|~Repair bridge abutment stemming from a bridge strike. ~|~13 - Bridge Rehabilitation~|~388E97DF4A45BD32E7D94712805323C6C2045D12 108399~|~1~|~1~|~01/NHS/ELVP~|~Landslide repair from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D484FE7FD708FE7CAB5FF166A107E01531783108 100879~|~1~|~1~|~01/STR~|~AC Overlay with and without repair~|~05 - 4R Maintenance - Resurfacing~|~32D9F8270F872CA1167B1D0235E1B3DDEA51B665 109620~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of school zone flashers within District 5 at OFAH-Rural locations.~|~17 - Construction Engineering~|~D3B1EBF1C503E1CF3D290019E3773A97D070070C 109620~|~1~|~2~|~02/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of school zone flashers within District 5 at NHS locations.~|~21 - Safety~|~96B206FC68A8E07D7C5054698F17E44A198831FC 104911~|~1~|~1~|~01/NFA~|~Kirkland Schools bus replacement~|~44 - Other~|~8EE95640F81A8DF8D7DAE993BBBC5F4874716D6F 82973~|~1~|~1~|~01/NHS~|~District Wide Pavement Preventative Maintenance project for the Priority System for FY2016. Routes include GRE-35 and HAM-126~|~99 - State Preventative Maintenance~|~46C0C04EB11460C3BB023438B89ED66EF499C846 87326~|~1~|~1~|~01/STR~|~Rural BRO 68 39.89 0801925 BRO 68 40.16 0801984 HIG 138 0.540 3602974SCI 728 1.53 7306172 PIK 104 1.85 6600905 ~|~13 - Bridge Rehabilitation~|~00F99CB5C79373F9CAB518C63AB31825070E5141 87326~|~1~|~5~|~05/STR~|~Culvert SCI SR 348 SLM 15.15~|~13 - Bridge Rehabilitation~|~3B89B234B8BC9ABE3E90C0BD0DFEB60B66A7C1F9 87326~|~1~|~4~|~04/NFA~|~Non Fed Aid HIG 131 1.21 3602168 ROS 102 0.34 7136862~|~13 - Bridge Rehabilitation~|~B487F51F488E20E395F0078F684D2F00714A93A4 87326~|~1~|~3~|~03/S<2~|~Urban HIG 73 10.57 3601676 ~|~13 - Bridge Rehabilitation~|~B558752341393742DA2722344E2E28E192A3CB0C 87326~|~1~|~2~|~02/NHS~|~NHSHIG 62 13.49 3601226 LAW 52 17.21 4401115 SCI 52 5.23 7300611 ~|~13 - Bridge Rehabilitation~|~BD76C5875562C438DD6345F07DFED3B153F67FAE 126224~|~1~|~1~|~01/NFP~|~MetroPark Trail IMP~|~28 - Facilities for Pedestrians & Bicycles~|~DE881BD1F215D8EE4FF4A3927B0FB99A8DB1F8C4 103011~|~1~|~1~|~01/IMS~|~Mowing Contract~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DEA98CB700727D1D58D9ADB9DF1F79C50ADCBC39 101636~|~1~|~1~|~01/NFA~|~Construction of a detention pond for Turnpike runoff.~|~44 - Other~|~3BA876AB7A61FD53E57D57919F22105CB1E87685 103592~|~1~|~1~|~01/STR~|~Intersection improvement at SR 39 and CR 77 in Holmes County.~|~21 - Safety~|~034AE94840F70D8F4EC37FDE2C05DC69C256871F 124601~|~1~|~1~|~01/S>2~|~CEAO HSIP Safety project to upgrade guardrail on various county roads.~|~21 - Safety~|~DCA3285C3AD166D42BCDE76B2394C8D23872F228 84602~|~1~|~1~|~01/S<2~|~Replace bridge BUT-122D-0148 (0902314), a 5 cell CMP pipe arch structure (87"x63") that carries SR 122 over the hydraulic canal in Middletown.~|~~|~5A31944ADB0A4B81E945815816B4487F36FE63D2 98853~|~1~|~1~|~01/NFP~|~Rehabilitation of Boggs Lane and Jake Sweeney Way within Springdale's Tri-County Parkway Business District including total pavement replacement on Sweeney Way, mill and resurfacing of Boggs Lane with necessary pavement repairs, total curb and gutter replacement, drive apron replacement as necessary, and new pavement markings.~|~04 - Reconstruction - No Added Capacity~|~BFFEB8B11845BD2DE73A10D7F25830DF9F8A5169 126894~|~1~|~1~|~01/NFP~|~Plan split for preventive pavement maintenance on various routes in the district utilizing state preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~2CBD8A7ACBBBAEE37BF80F524F267DD2C9BDE7C6 82819~|~1~|~1~|~01/NFP~|~Slide repair along SR-531 near Whitman's Creek, Ashtabula County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~267DE8824054B44E47AAA2D1B3171C0E7488FAC3 115550~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in POR, STA and SUM counties.~|~21 - Safety~|~E8FD94FA968E00D4451D8F9DD2D9DC086453D94C 115820~|~1~|~1~|~01/IMS~|~Remove & replace mainline superstructure.~|~17 - Construction Engineering~|~5BDB50AAD8F3A1016F28DFDF5D9573E5DA88BC38 85029~|~1~|~2~|~02/S<2~|~Project scope is plumbing and electrical upgrades to the Marietta Armory Square Welcome Center (project) on Front Street using Federal Scenic Byway funds. 100% Local portion.~|~39 - Establishment of Transportation Museums~|~133AFD6AF0EBC942283D74CC1CD02ADC0C28F792 85029~|~1~|~1~|~01/ERD~|~Project scope is plumbing and electrical upgrades to the Marietta Armory Square Welcome Center (project) on Front Street using Federal Scenic Byway funds. SB-2007-OH-5 Program Code L970. 80% Federal and 20% Local.~|~39 - Establishment of Transportation Museums~|~50237932DEEEF0F5BB2B2DB4243903AAF0F67CC3 116421~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project.~|~21 - Safety~|~4563F70D115FE18C912964C5FADDAC7C791FC8BB 99620~|~1~|~1~|~01/NFP~|~Construction of a 3,000 ton salt coverall (60'x100') with brine tank pads on north side of building, 3 bay cold storage building (32'x48), Loader lean-to (16'x20') with electric for a block heater and lights, 840' of fencing, 50' gate and 20' gate. All dimensions approximate.~|~~|~8EB735931C762A87A1637F86370569F4164771F0 115619~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~8CB091D4994EB8C55A358B0CF6B74C22F7F7BBCA 115831~|~1~|~1~|~01/IMS~|~Minor repair on structure FRA-670-3.12 (SFN 2517639) over Neil Ave.~|~47 - Bridge Preventive Maintenance~|~F975F691D16CDB9422568692830A8D78ED946A24 118109~|~1~|~1~|~01/SAF~|~Install a roundabout at US 33 and SR274~|~21 - Safety~|~E8E48AE72BE081C63B9B9E873FE7B302EF0A643B 116557~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0B17DCB790F24299056C58792FF1D90DFEC3FFBF 114815~|~1~|~1~|~01/S>2~|~4 inch overlay on Maier Place and other necessary items~|~04 - Reconstruction - No Added Capacity~|~435D826451F4B6E3FFD92132F7EC095717DE27D2 95532~|~1~|~1~|~01/STR~|~On US50, begin @ US35 ramp (SLM 28.11) and terminate at Vinton Co. line (SLM 37.68), it is proposed to resurface the highway with asphapt concrete.Pave Thru:SFN 7103328 SLM 28.35 (This is a RR bridge which will be mill & fill under it.)SFN 7103476 SLM 36.3080/20~|~05 - 4R Maintenance - Resurfacing~|~73BDB037062F5B1D940A8C8B8AE309FD3535B6BC 95532~|~1~|~2~|~02/STR~|~Bridge for rehab.SFN 7103336 SLM 29.67SFN 7103425 SLM 32.76SFN 7103492 SLM 36.92~|~13 - Bridge Rehabilitation~|~595665E92A10D9D3BBA1CF099990A32D92986485 95532~|~1~|~3~|~03/NHS~|~SFN 7103395 SLM 25.06~|~13 - Bridge Rehabilitation~|~A9C7629054A6B1D6614FDCFC8211D14B39B9D194 100868~|~1~|~1~|~01/NHS~|~This plan split is for NHS route.~|~05 - 4R Maintenance - Resurfacing~|~1E367A6794C9F22AABD8EA8BF2F8D7834921121C 106101~|~1~|~1~|~01/IMS~|~FHWA Emergency Relief Finds - 4BY7 (100% Federal) - Slip repair of 300 feet of fore slope along Gue-IR 70-11.33~|~04 - Reconstruction - No Added Capacity~|~87A235FBE195BDF783DA3547EB38646C4E67384D 92589~|~1~|~1~|~01/IMS~|~Resurfacing and related work on IR 70 in Licking and Muskingum Counties~|~05 - 4R Maintenance - Resurfacing~|~A2C87F20C7EC6AFC2AA876AC44602ED7EDC270A9 93435~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption.~|~21 - Safety~|~5089E705F9D6AC63F35F97F63FA70FBCF08657B4 93435~|~1~|~2~|~02/NFP/Akrn~|~In-eligible signal items.~|~21 - Safety~|~F0A25952C8B4A7B529A462AF050EEC0895492CD2 91031~|~1~|~2~|~02/MPO~|~100% Local items.~|~~|~C534224173B295C0BB282A91A59A9A44A1360FD8 91031~|~1~|~1~|~01/MPO~|~Minor rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE0FE8AD8A85E45D7BCBD98D759F25EF586E962E 110323~|~1~|~1~|~01/NHS~|~Replace structure HAS-250-0370 (SFN 3401561) with new structure.~|~10 - Bridge Replacement~|~F11914BBF2851AD627F16405158D8FDC90B82F96 120128~|~1~|~1~|~01/S>2~|~Work eligible for SRTS Funding~|~21 - Safety~|~B4D030E0E8C0FBE6AD64A9D2CF8C81715116BDA8 120128~|~1~|~2~|~02/NFP~|~Plan split for work items not eligible for SRTS funding, 100% local~|~21 - Safety~|~1103F05A215D6BB7C4777E451F394180E5718A7E 124861~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~9B48A2C9C115089C37EE77AD9850CCF091F4D717 106732~|~1~|~1~|~01/SAF~|~Signal upgrade work funded through ORDC.~|~44 - Other~|~814FEB807948E1EE6C59A09B7E410183F930DAFC 96598~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 554 11.52 and 12.37. Rural other federal aid funed 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~49D8B6A8B1A1405E8E9453B1E6FC2AF53FD4A14C 88873~|~1~|~2~|~02/S>2~|~FY2015 Urban Paving in Springboro on Sr 73 from I-75 (slm 3.91) to Sr 741 (slm 5.88). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~69545BBE385A8DEF61DBC18AC3FEE049F00415A8 88873~|~1~|~1~|~01/S>2~|~FY2015 Urban Paving in Springboro on Sr 73 from I-75 (slm 3.91) to Sr 741 (slm 5.88). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~70199D3C0D2A22804FDB96A336EDE95E3E9E7E6D 125377~|~1~|~1~|~01/SAF~|~Traffic Signal Replacement including Radar Installations.~|~21 - Safety~|~D4D11A246FB9CFDB4B84475B8C8731C8C5F4F358 89262~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~4E4AE61167E296841CA75D051F559CC593466ACE 89262~|~1~|~2~|~02/NFP~|~Work items that are not eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~064ABB938AE254028EF1007EF05E917956B33CF1 115188~|~1~|~1~|~01/ENH~|~Project will add bump outs and curb ramps at the intersections of Stewart St. and Conley St. and at Stewart St. and Hopeland Ave. This improvement will also add pedestrian scale lighting and decorative crosswalk markings.~|~28 - Facilities for Pedestrians & Bicycles~|~BD195D51140E6B81131CDB521847E3910F5B7817 102794~|~1~|~1~|~01/STR~|~Apply smooth seal to various STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~1143C78668391556D645BD99B016DAAC9582F6C9 102794~|~1~|~2~|~02/S<2~|~Applying smooth seal to various STP < 200k routes~|~05 - 4R Maintenance - Resurfacing~|~79F1185675F086B0BDE17FBD21A71CC738D16957 102794~|~1~|~3~|~03/S>2~|~Applying smooth seal to various STP > 200k routes~|~05 - 4R Maintenance - Resurfacing~|~20D2FA609F866AE54253357F03C0CA25ED358AAC 114258~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges~|~17 - Construction Engineering~|~14DF920A6C483F1BEAD9F86F03D20E325EB7585D 97550~|~1~|~1~|~01/NFP~|~Costs for installation of signs only~|~44 - Other~|~3FDB84013CAEEA8A62B57AE3CBF6228FE946B688 121795~|~1~|~1~|~01/SAF~|~GR on various CR.~|~21 - Safety~|~D7F9823453F3D9C8A3E1204F0257D03B65F57362 109677~|~1~|~2~|~02/S>2~|~Chip seal on the urban section of GRE-380:GRE-380 SLM 6.36 to 6.93~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9CF60FA545B9765610137EDA8E285CF23E5E4749 109677~|~1~|~1~|~01/STR~|~Chip seal on the rural locations on portions of CLI-28 + GRE-380 :CLI-28 SLM 5.48 to 10.38GRE-380 SLM 0.00 to 6.36~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~38E7C37330779F5D2FCC36B93D548F227A9474EC 95484~|~1~|~1~|~01/STR~|~01/STR/OT ; Plan split for 80% federal and 20% state funded culvert work using the culvert SACs 4CW7 and 4CV7.~|~44 - Other~|~C27F44D827449B4AD01498215D3214F615B20D62 98037~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Gue-SR 513~|~05 - 4R Maintenance - Resurfacing~|~6E97A5ABD636B366AFD5811C8E7475726B57ADBF 98037~|~1~|~2~|~02/NFA~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Resurfacing on Gue-SR 761~|~05 - 4R Maintenance - Resurfacing~|~23ABBDB52F8FE257A529804BC6FC53C017955263 98037~|~1~|~3~|~03/IMS~|~District Preservation Bridge Funds - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Concrete Deck patching and deck sealing on selected bridges~|~13 - Bridge Rehabilitation~|~391CCD6059158765EE9D4726663AC5083EE7D839 98037~|~1~|~4~|~04/STR~|~District Preservation Bridge Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Concrete Deck patching and deck sealing on selected bridges~|~13 - Bridge Rehabilitation~|~2460BD76448C8588C702EF41B6E6A2DFBF12E156 98037~|~1~|~5~|~05/NFA~|~District Preservation Bridge Funds - 4PS7 (100% State) - No CAP - Concrete Deck patching and deck sealing on selected bridges~|~13 - Bridge Rehabilitation~|~F7AA109E908E2FFB312CC7E6A8A4040F3C7D3EF6 122090~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~35E312AA61A7D0298D439CB36677964034BEE667 119877~|~1~|~1~|~01/STR~|~Landslide repair.~|~66 - Resilience Improvement - Highway Project ~|~288220C05BB9C41F3C1210DEEAB73CDEAF6AF1BC 116594~|~1~|~1~|~01/IMS~|~Plan Split for resurfacing on CLE IR 275~|~05 - 4R Maintenance - Resurfacing~|~7E354669C06C389F3B66715736454019F6BD6F5E 90702~|~1~|~1~|~01/MPO~|~MPO funded project to resurface waterville-Monclova Rd in the City of Waterville. LUC CR124 0.00 -0.75~|~05 - 4R Maintenance - Resurfacing~|~2B9C2158F078329BB84C8748D8CDD046463FF1AF 126813~|~1~|~1~|~01/S5K~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~8B732D51BE3A05B5BE942E24D6B93AB18CDA63B1 126813~|~1~|~2~|~02/STR~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~40571FCCC6E140BE46F063EDA82A908198E712AF 109559~|~1~|~1~|~01/BRF~|~Bridge Replacement Plan Split~|~10 - Bridge Replacement~|~C9EF453A92D2D16583B8D973261EF66BD5E5236F 104150~|~1~|~1~|~01/NFP~|~Guardrail~|~44 - Other~|~FCC1DB867E5EB1866CF4EBCC74BF79B13C445802 101342~|~1~|~1~|~01/STR~|~bridge rehab.~|~13 - Bridge Rehabilitation~|~64BDD518EC4CC3C425211E09F7B8633ADB41B2DA 119043~|~1~|~2~|~02/NHS~|~All bridge overlay work for bridges classified as being on the NHS. ~|~47 - Bridge Preventive Maintenance~|~9C47631D70D8F7424D49CC12A0B9CB5DCB48BC94 119043~|~1~|~1~|~01/STR~|~All work on STP Rural classified bridge located on SR 249 in Defiance County over the St. Joseph river.~|~47 - Bridge Preventive Maintenance~|~DC2F44C159D693A02534FC411E4EA4F91A84E749 108690~|~1~|~1~|~01/IMS~|~Culvert split~|~44 - Other~|~329256FF671AECB38A4EDE2D6883F8DC32524C1D 102490~|~1~|~1~|~01/NHS~|~SR 7 3.55 to 5.20 Double microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~0662C869E6937222AB04E9B2ACB28B179CC950F4 116254~|~1~|~1~|~01/SAF/STRE~|~Intersection improvement on POR SR 303 at Diagonal Rd in the City of Streetsboro.~|~21 - Safety~|~BED3278901C6560350CB5A6214EE155078770E06 98230~|~1~|~1~|~01/NFA~|~Installation of sidewalk and crosswalk markings on North Henry and Oldfield Road.~|~28 - Facilities for Pedestrians & Bicycles~|~E85D2496E3A383950554D92C538703593CFC26BD 120772~|~1~|~1~|~01/NHS~|~Repair bridge carrying SR 7 over IR 470 ramp traffic from over height vehicle strike.~|~13 - Bridge Rehabilitation~|~9D2F9366DBE2D9639B5EC5C249C3EF35B4537BF1 97061~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Replacement of Thermoplastic Pavement Markings in Licking, Muskingum, and Perry Counties.~|~21 - Safety~|~99122A57E83C25CCD6B21F8BE5AB1AC405520E57 81488~|~1~|~1~|~01/NHS~|~priority system resurfacing of BEL-7-20.08 to 23.45 includes pavement repair, guardrail and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~D96A5E9EC31B058EFF34F9776B0CD15AC9224BB1 124051~|~1~|~1~|~01/NFP~|~Plan split for lighting replacement and upgrade at various locations in District 12~|~21 - Safety~|~4D417BB42A8A47B394580571396FD6DDE71BC492 114852~|~1~|~1~|~01/SAF/S>2~|~Recessed - Wet Reflective pavement markings placed on completed projects. This plan split is for the HAM-22 locations.~|~21 - Safety~|~8B75BD3FFD09503E34CFEACDF1301672963BD70E 114852~|~1~|~2~|~02/SAF/IMS~|~Recessed - Wet Reflective pavement markings placed on completed projects. This plan split is for the interstate locations.~|~21 - Safety~|~5B062632EC9AC5F616EA62BC12C87586F029375F 114852~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~1B212CE723406175E59FF08C49D89DAE8F1C707A 108865~|~1~|~1~|~01/MPO~|~Resurfacing of Smith Rd from Fairlawn East Corp to just east of Sand Run Road.~|~05 - 4R Maintenance - Resurfacing~|~585FFBE3DDE8734B31B2191F9F68859788466C96 79011~|~1~|~1~|~01/SAF~|~Reconstruction of the existing roadway, including mill and fill, replace existing drainage, enclose the drainage ditch along the East side of Upper Valley Pike, South of SR 41. Replace/eliminate guardrail, upgrade/replace existing signnals and signage. Evaluate culverts/drainage structures for possible replacement on CR 327 in Clark County on CLA CR 327 0.55 to 1.95.~|~21 - Safety~|~297FE1E7831D99915B0C180D214C166946231DFB 88983~|~1~|~1~|~01/STR~|~HIG SR41 0.00 - 7.36 resurfacing project80/20 split~|~05 - 4R Maintenance - Resurfacing~|~0E07627450DB10EC6BE0C55151013AABFA9066A2 88983~|~1~|~2~|~02/STR~|~HIG SR41 Brdgs F/Rehab:3600459 HIG SR41 0.4 Intersect: Straight Creek3600483 HIG SR41 4.49 Intersect: Trib Of Sunfish Creek3600521 HIG SR41 6.34 Intersect: Bakers Fk Of Brush Creek80/20 split~|~13 - Bridge Rehabilitation~|~3C1B72A3240C6325054F6759C0D44368EE41B578 110608~|~1~|~1~|~01/NFP~|~Split for preventative maintenance signal work using for non-federal aid funded project~|~21 - Safety~|~5AD4338D1D4DDCDC2080CEB84F4C7F8D2E4E3AFF 103123~|~1~|~1~|~01/STR~|~District Allocation (4PS7): Replace School Flasher Signs, Replace Flashing and Illuminated Beacons and Downlights~|~21 - Safety~|~7A5F8604A7952C80AE4E664365AE53A3DAF77272 103123~|~1~|~2~|~02/SAF~|~Replace Battery Backups.~|~21 - Safety~|~B811943EE4B844DA9F081FED5A4DC4912DC49E84 84508~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an mill and fill treatment on ATH 691 9.20-9.58. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~7938592FEE83FC3E73B91D54D6C15F317D289A40 84508~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment on HOC 278 0.34-5.38. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B69A8C8055B6CFB05EFF9CFEA25655DE526B575E 106653~|~1~|~1~|~01/NFA~|~Construction to replace Cardington-Western Road Bridge (SFN 5931509) over Whetstone Creek. SFN 5931509 replacement necessitates SFN 5933277 replacement.~|~10 - Bridge Replacement~|~49481CF0D168C3C42396C376E3F58DF3BB38839E 125838~|~1~|~1~|~01/IMS~|~Plan split for bridge rehab of I-71 bridges over Kenwood Rd. ~|~13 - Bridge Rehabilitation~|~9B9B6466447418C170423ED473618FA1CB9C2840 98046~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - 100% State (LBP7) - on-going services during construction.~|~17 - Construction Engineering~|~4593739C43714C9B7DB2D97CBA8E75555AA406A1 97529~|~1~|~1~|~01/BRF~|~Block PID Setup for Construction Change Orders.~|~~|~BD1E541E79A432C2455A7BDFC5B1A467630334D0 96569~|~1~|~1~|~01/NFA~|~Funding for all work~|~44 - Other~|~85D5EE76DA41FADC0F1164D6974E6EB7FFEE1495 115596~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~90146EAC0FBD659C01D43FB177C64B748EBEA8BF 115596~|~1~|~2~|~02/NFA~|~Created for ODOT J&C funding. ~|~44 - Other~|~60F9FFD09B71A6BD079ED831F4CCA683FACAF403 110040~|~1~|~1~|~01/NFP~|~repair/replace culvert~|~44 - Other~|~969483193CE4A10FE215CD532067FF95DFEE4383 115399~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~C38A9A79235C5541439A7290F2C8872FB9314B34 94811~|~1~|~1~|~01/IMS~|~Plan split for miscellaneous concrete repairs on the interstate system~|~44 - Other~|~388D79F6E39CB1F051E71DCCC175E2197CAE0DF8 86989~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a microsurfacing treatment. GAL 218 16.46-17.14. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~523D672DC1C66C2529BD3B37A2E09001F4516C5E 86989~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. GAL 218 13.87-16.46. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~2754B4AF15A8F25670918341299A9E985D633E9F 117896~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~780200D4D426F99E7FACDC432745425AD61D5276 125032~|~1~|~1~|~01/NFA~|~Bridge replacement municipal bridge program~|~10 - Bridge Replacement~|~B796BF716398C2071504D60EF3913FE5BB39BF46 117742~|~1~|~1~|~01/SAF~|~Roundabout construction. All work is included in this plan split.~|~21 - Safety~|~3F8F4D9FB7F7975F0B76D13B7B4BB69FA92E40C0 117742~|~2~|~2~|~02/STR~|~All bridge replacement work for SR 81 bridge over Patterson Ditch. Part 2 to this project, originally from PID 110593.~|~10 - Bridge Replacement~|~C738563D79ED225A1EDD2F877B99FDE910EEC938 111533~|~1~|~1~|~01/MPO~|~TMACOG CMAQ funded items~|~28 - Facilities for Pedestrians & Bicycles~|~6B55C5B675C8AECC60324B3A49BC731E8DD111DA 111533~|~1~|~2~|~02/BRO~|~Plan Split for Local Major Bridge funded scope items.~|~47 - Bridge Preventive Maintenance~|~C68068C0342FE0F5A932C79A0FCEB898985D5567 111533~|~1~|~3~|~03/NFP~|~Plan Split for 100% Locally Funded Scope Items.~|~28 - Facilities for Pedestrians & Bicycles~|~E24EE0FD87248F4E4FC26915E79F83404EC9E81A 105303~|~1~|~1~|~01/NHS~|~Resurfacing TUS-36~|~05 - 4R Maintenance - Resurfacing~|~46939D20D503E529AD3DD9085FC1037209A45998 105303~|~1~|~2~|~02/STR~|~Resurfacing US 36 from IR 77 to the end of the 4-Lane (SLM 3.85)~|~05 - 4R Maintenance - Resurfacing~|~BCEC8FB81B237A696EC2065BF8D0A9DC87E3642B 105303~|~1~|~3~|~03/BRO~|~Bridge deck sealing of SFN 7900155.~|~47 - Bridge Preventive Maintenance~|~4B2D103A77164C855894473A8F09104428D70AAF 93806~|~1~|~1~|~01/MPO~|~Resurfacing of North Depeyster (CR-503) from East Main Street to Crain Avenue, in the City of Kent.~|~05 - 4R Maintenance - Resurfacing~|~41CBC6925FC41AA740CE86B7D5B628C73B999603 97975~|~1~|~1~|~01/IMS~|~Resurfacing of BEL-70 from SLM 15.72 to 19.17 to include asphalt concrete overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~E3E29FB6973D321AF5C7BABC4731A7B985B72533 116315~|~1~|~1~|~01/IMS~|~Plan split for landscape maintenance in interchange areas in Franklin County.~|~44 - Other~|~87A1622A3F2F3EB839831E64572857AFD9A22EF0 109078~|~1~|~1~|~01/STR~|~Full depth pavement rehab on US 35 from 1.66 to 2.61.~|~~|~47C93B071B9263CCC0E65746D88B71391A33989E 93584~|~1~|~1~|~01/ENH~|~Add sidewalk in Village of Beverly through the Safe Routes to School Program, 100% Federal. Begin on 5th Street between McIntosh and Park Streets (180'); Park Street between 5th and Mitchell Streets.~|~28 - Facilities for Pedestrians & Bicycles~|~AE1D4359519D7E37208DDEBA71C68AF93FADC11D 98771~|~1~|~1~|~01/SAF~|~Upgrades to the existing Central Traffic System with advanced technology, within the City of Fairfield, OH.~|~21 - Safety~|~F34854A9640385A90913A29F65E4E8E90D0C54F1 98771~|~1~|~3~|~03/SAF~|~Plan Split for work at 2 signalized intersections that do not meet warrants (River & Cole and Resor & Augusta/Salem). Signals will be included in project by paid 100% locally.~|~21 - Safety~|~2062C89B2D89DCE288CE03BEFDC3E382DD128B42 98771~|~1~|~2~|~02/SAE/FAIR~|~This plan split is for 100% Safety items, i.e. work at the signalized intersection of SR-4 with Diversion Road.~|~21 - Safety~|~A1A25318B2D592D1C827A6F0ABACF5C8318656C9 126172~|~1~|~1~|~01/NFA~|~no location determined yet.~|~44 - Other~|~A7351AD80C519D070C091D8598C5843A61D45CAC 99212~|~1~|~1~|~01/NFA~|~J&C , repaving business park.~|~04 - Reconstruction - No Added Capacity~|~0291FD194AC58D18CA45ACFB08DC38EE0BE99F9A 115507~|~1~|~1~|~01/NFP~|~District wide herbicidal spraying. ~|~44 - Other~|~E3854E2F1069CE25F9B789D919A0F578E2CCA6AA 112819~|~1~|~1~|~01/STR~|~Resurfacing SR 800~|~05 - 4R Maintenance - Resurfacing~|~3C672A694925ADFE9BEA2A348A9A6E8A1CC41902 119059~|~1~|~1~|~01/NFA~|~All work included in this split.~|~47 - Bridge Preventive Maintenance~|~190CDC993F67FF2C5BE43259A2370DAAA9CEBEF1 105287~|~1~|~1~|~01/STR~|~Resurfacing of HOL-241~|~05 - 4R Maintenance - Resurfacing~|~84AA1DA6E0FEEA2A294BC8E804CBFFB394D31132 125344~|~1~|~1~|~01/STR~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~0224406E8A4FF51A3905E58CD481AC36955C2B6E 110922~|~1~|~1~|~01/SAF~|~Improve the intersection of DEL SR 605 and DEL CR 20 (Fancher Rd)~|~04 - Reconstruction - No Added Capacity~|~A3E8F57AB884BCF3C201AA506E0368354B052F06 110922~|~1~|~2~|~02/SAF~|~Plan split for delay costs caused by utility companies~|~04 - Reconstruction - No Added Capacity~|~873FD43ABCAB4C45F96AEE96F8EF4F2C9FC78869 102481~|~1~|~1~|~01/STR~|~Resurfacing SR 516 from SLM 3.70 to 7.05~|~05 - 4R Maintenance - Resurfacing~|~392377586EBE0F4F6937FED4586ED77EA6AA0D9C 102481~|~1~|~2~|~02/S<2~|~Resurfacing SR 516 from SLM 7.05 to 7.16~|~05 - 4R Maintenance - Resurfacing~|~DC3E4341D55C18329E76EDC2C7503E1D93CBA97B 108075~|~1~|~1~|~01/NHS~|~Rehab NHS bridge.~|~13 - Bridge Rehabilitation~|~EDCF5E11A191E96E6E22E3D77AA30AD232C3B3FD 108075~|~1~|~2~|~02/STR~|~Rehab rural bridges.~|~13 - Bridge Rehabilitation~|~D2F44B28B7C4B9735B0A589E848369F6821BD5BF 122937~|~1~|~1~|~01/BRO~|~Emergency bridge repair. ~|~13 - Bridge Rehabilitation~|~92DA60FEAC2C30BBCF72C8AAFC99490F690FD95C 101146~|~1~|~1~|~01/STR~|~Various bridges.~|~13 - Bridge Rehabilitation~|~7E8DE3FE24D7E8C8BA5DAD0DDC85C53A65BC5857 96246~|~1~|~2~|~02/S>2~|~STP>2. SLM 1.41-4.68 2517302 FRA-674-0248 over Little Walnut 2517272 FRA-674-0175 over Bishop Run~|~05 - 4R Maintenance - Resurfacing~|~2DD0287C17489922565CDCDE0177B4F9D1D519C4 96246~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.00-1.41 2517221 FRA-674-0053 over Long Run~|~05 - 4R Maintenance - Resurfacing~|~B159E2C22057BF622BF61D7E401586B72D12C5C5 96246~|~1~|~3~|~03/S>2~|~2517302 FRA-674-2.48 concrete deck overlay~|~13 - Bridge Rehabilitation~|~C22C6C4F76E19ED2BAF756DA3E70F75543BE3C8C 102023~|~1~|~1~|~01/IMS~|~Deck replacement and other associated bridge items.~|~13 - Bridge Rehabilitation~|~EADDFED9F99B7B15094BBE19546DBDF0D2FE8567 125912~|~1~|~1~|~01/NHS~|~Establish pro rata percent~|~44 - Other~|~398348BDA49BD267E30FC99A064507BA4FB432CE 84810~|~1~|~2~|~02/IMS~|~"02/IMS/CV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Culvert Liners or field paving of culverts under IR 70 in Licking County: 1) Lic-IR 70-25.82 CFN 4507025.82 (96"x202') under CR 288 (Midland Oil Road); 2) Lic-IR 70-24.22 CFN 450702422 (48"x234' CMP) carrying IR 70 over TR 334 Mt Hope; 3) Lic-IR 70-29.08 CFN 450702908 (96"x320' CMP)~|~04 - Reconstruction - No Added Capacity~|~07676076BBADD2A20876476DF9BC839AAF8327FF 84810~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 4504321 LIC IR70 25.98 Intersect: Wise Run; BR Eligible for Rehabilitation: Length=28 SD/FO(1) SR=49.6 DSR=" "~|~13 - Bridge Rehabilitation~|~0DA33E2423220569E91C8FD2A2D43C554B379B8C 85363~|~1~|~1~|~01/STR~|~relocate road between HEN SR110 3.51-3.55~|~~|~28EE2AE06AF2FCDA8DB126810FD1224D1568C05C 111640~|~1~|~1~|~01/NHS~|~Rehabilitate structure FRA-315-0278 over Olentangy River~|~13 - Bridge Rehabilitation~|~C15FFF3D49BB32BFB99C0B12A500FB8CA1DAADBF 111640~|~1~|~2~|~02/NHS~|~Resurface SR 315 from north end of bridge (King Ave) to SLM 3.39 (just south of ramp bridge)~|~05 - 4R Maintenance - Resurfacing~|~43B86B131E24E3418FC2E2294D0A6F98AE62E09D 94061~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - State Parks Funding 4BF7(100% State) - No CAP - Slip repair funded under ODOT/ODNR Park Maintenance Program.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~84E6910AC12F19ACF3EAF68CF272A5B7F5F34D0A 121339~|~1~|~1~|~01/STR~|~STP Rural.~|~05 - 4R Maintenance - Resurfacing~|~7C8779655E92CC562F8B736A7FA6FA63FBE66C35 96801~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~D06B1B032FE3FC880CC1C651142037D5C5CF8604 125879~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment. WAS 7 24.952-27.663~|~05 - 4R Maintenance - Resurfacing~|~36CC66554A15D0FD251A1DDDDDC5C78B545E29AC 105185~|~1~|~1~|~01/IMS~|~Split for bridge deck replacement over the interstate~|~13 - Bridge Rehabilitation~|~2368519001506C9BEDB52A627BA04AC1EA880607 117662~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~7D49E21BA70FC920062D47ABFF95331A7278C164 86891~|~1~|~1~|~01/STR~|~SR-19 from SLM 0.0 to SLM 3.29 SR-269 from SLM 4.37 to SLM 5.52 both routes in Ottawa County.~|~05 - 4R Maintenance - Resurfacing~|~75F61C8A2183F4370EE6527BA401F38BA2FFA5D2 112026~|~1~|~3~|~03/ENH/KENT~|~Sidewalks and pedestrian enhancements.~|~28 - Facilities for Pedestrians & Bicycles~|~50B3A496A08DAE3E720B4B12399A8550CB741711 112026~|~1~|~1~|~01/MPO/KENT~|~Reconstruct SR 59 (E Main St) from Willow Street to Horning Road. Includes installing raised median, replacing two signalized intersections with roundabouts, install bus pull-offs and install new storm and sanitary sewers in the City of Kent, Portage County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~5C9D717BD2EA056EEA2A6FA76E418440F1AEE11F 112026~|~1~|~2~|~02/NHS/KENT~|~TID funding for reconstruction.~|~04 - Reconstruction - No Added Capacity~|~64B0541DAB04CE07267177D413B00D07EDD3251D 112026~|~4~|~4~|~04/ERD~|~EV Stations~|~~|~E7DFFF0BCFDA4C9D6CD1073B69AAD716187C4D4E 109841~|~1~|~1~|~01/NHS~|~BRO 32 0.00-8.15~|~05 - 4R Maintenance - Resurfacing~|~04C03C93D42480FE8F175FE7B9BD436531BA7AD8 109841~|~1~|~2~|~02/NHS~|~Bridge preventative maintenance. ~|~47 - Bridge Preventive Maintenance~|~FF35110CCB82D3D353703E5A505AF7E11D545356 121389~|~1~|~1~|~01/NHS~|~Plan split for resurfacing on SAN-20~|~05 - 4R Maintenance - Resurfacing~|~8D18B9818634DF6AAC04CFD52A2A56626279282F 121389~|~1~|~2~|~02/NHS~|~Urban Paving within City of Bellevue, resurfacing. No repairs, curbs, or sidewalks.~|~05 - 4R Maintenance - Resurfacing~|~E511601F478F74D4243688D38DD97D453DB8DE3F 121389~|~1~|~3~|~03/NHS~|~100% Locally funded scope, including full depth repairs, curbs, and other scope not eligible for Urban Paving funds.~|~05 - 4R Maintenance - Resurfacing~|~2F6C512CAD9CD0130EE756574317B15F5A7F58B2 107642~|~1~|~1~|~01/STR~|~JAC 788 4.69 (4004388)~|~04 - Reconstruction - No Added Capacity~|~5C63587E045EE4D7A5FAEB1469A5492E2ABC0684 110836~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~04 - Reconstruction - No Added Capacity~|~74AA7A440B6906CBDEEF4E21E8E15842BAE0027C 115818~|~1~|~1~|~01/IMS~|~Remove & replace mainline superstructure.~|~10 - Bridge Replacement~|~172B5C9C7DA7D8ED6D2DE3DC944A97820EF66431 106119~|~1~|~1~|~01/SAE~|~Plan Split~|~21 - Safety~|~4EBAFAE668E41FD4D909733DB14E15430C06BC3A 122809~|~1~|~1~|~01/STR~|~Replacement of SFN 3005348 GUE-SR 313-10.88~|~10 - Bridge Replacement~|~56B9DD200C3FA26C9592DE0DE99200911CD7BF45 115751~|~1~|~1~|~01/S<2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving project~|~05 - 4R Maintenance - Resurfacing~|~F9FF6061C717D83FA9692797FF41F6DC8F8FCCC9 115751~|~1~|~2~|~02/S<2/MID~|~Plan Split for the 100% City items on the urban paving project~|~05 - 4R Maintenance - Resurfacing~|~CDB3EFE15F948A3893CD16FBE1C99219EA0A9647 108634~|~1~|~1~|~01/NFP~|~This project will include the widening and turning radius improvements at the throat of the new proposed street to Airstream's new facility. The proposal includes 280' west bound center turn lane along SR274 and a 280' east bound drop (right turn) lane into new street.~|~01 - New Construction~|~02663960C84C2FB3C98450C6496925554ABDFFBF 93592~|~1~|~1~|~01/IMS~|~Pavement from SLM30.70 in Wood to SLM 1.10 in Lucas.~|~04 - Reconstruction - No Added Capacity~|~64D5986847D6FB36EB51A31135DE823D9B40C1C4 93592~|~1~|~2~|~02/BRO~|~Various Bridges.~|~10 - Bridge Replacement~|~2CDCC544B890820B40C7256B5FD4D19960693F5D 93592~|~1~|~3~|~03/BRO~|~Plan split for structure rehab of I 75 over CSX - Woo-75-31.11 pair~|~13 - Bridge Rehabilitation~|~73C4BEFE0E2BD7F31A89660122DB3CF8E1D73C20 93592~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~DB0EA31026234D64B02B381414963E6F0DE2A8AA 115503~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~AF7CCE0EA3FA29DBADB63BDA3F72ADDD6D77D21D 127085~|~1~|~1~|~01/STR~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8825E3A870BDA543C7CF785897832458145A308B 112695~|~1~|~1~|~01/S<2~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items):~|~05 - 4R Maintenance - Resurfacing~|~D8F10AB971B8BCA0EC9A2836C46196196527B031 112695~|~1~|~2~|~02/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?):~|~05 - 4R Maintenance - Resurfacing~|~DEC234BFB16710B6DF20756FEA9F6C37ACAC0993 112695~|~1~|~3~|~03/S<2~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):~|~05 - 4R Maintenance - Resurfacing~|~B52CD2FC9526018537C86B2ED11E4436C3646173 126904~|~1~|~1~|~01/NFP~|~Created plan split for ODOT TID involvement. ~|~~|~621B570CB6E6EE35936EF5F6F1B94C8CC1E932A4 103513~|~1~|~1~|~01/NHS~|~DSR# BEL-012~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB889C8419A02EE38E005DF4567A9C5AA1804731 88964~|~1~|~2~|~02/STR~|~"02/STR/CV/ " - District Culvert Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Tunnel liner on the culvert on Mus-SR 93-01.16 located 0.31 miles north of TR 88,~|~04 - Reconstruction - No Added Capacity~|~48845E3B17B6D274CD088C7A1D4A531FEB6962F1 88964~|~1~|~3~|~03/IMS~|~"03/IMS/CV/ " - District Culvert Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Application of a tunnel liner to the Culvert at Gue-IR 70-06.59 located .01 miles east of SFN 3001024 & 3001059~|~04 - Reconstruction - No Added Capacity~|~8779A19B2CE96C29033F5CE755BFC14E82A91C0F 88964~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Tunnel Liner on 1) 3001415 GUE IR70 11.7 Intersect: I-70 Over Double A Run; Not BR Eligible for Rehabilitation: Length=12 SD/FO(1) SR=52.9 DSR=" "; ~|~13 - Bridge Rehabilitation~|~D2ACC43CDFE8A978E78DEF96274BACB76E7E224C 123124~|~1~|~1~|~01/NFP~|~All truck parking construction work to be included in this split.~|~~|~E51CBF70B058F8FB363AA9B4E738BAEB5096342E 119233~|~1~|~1~|~01/STR~|~Plan split for project to replace bridge PRE-122-2436 that carries SR 122 over Elk Creek. ~|~10 - Bridge Replacement~|~21E18E4A503BC8F1F46896BFF3FA5B1760751F94 113441~|~1~|~1~|~01/SAF~|~SAN-6 from SLM 14.53 to SLM 18.44: SAN-20 from SLM 14.59 to 15.29 and then from SLM 18.68 to 24.43; WIL-127 from SLM 1.05 to 1.94. For pavement markings of various locations on the NHS system. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget.~|~21 - Safety~|~676C995F339E79E3714D88575915C430FE643857 113441~|~1~|~2~|~02/SAF~|~WOO-25 from SLM 15.82 to 18.29; WIL-127 from SLM 0.29 to 1.05. For pavement markings of various locations on the OTHER system. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget.~|~21 - Safety~|~1FC97CE2D14F7722F7DCE7985AA05E4716555F1C 113441~|~1~|~3~|~03/SAF~|~WOO-25 from SLM 18.29 to 20.20. For pavement markings of various locations on the OTHER Urban system. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget.~|~21 - Safety~|~B9B06346EF7E206BE62BDDA62BAEB8A1AC95ADF4 113441~|~2~|~4~|~04/SAF~|~For pavement markings on the Interstate system in Allen and Hancock counties which are in ODOT District 1. This involves work on I-75 in Allen County from 15.77 to 23.12 an on I-75 in Hancock County from 0.00 to 3.22 and from 14.09 to 19.22. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal.~|~21 - Safety~|~6E083FF71F5719C67052393B89AAD7D672280391 113441~|~2~|~5~|~05/SAF~|~For pavement markings on the NHS in ODOT District 1 on US 68 in Hancock County and US 23 in Wyandot County. This involves work on US 68 in Hancock County from 14.64 to 15.88 and on US 23 in Wyandot County from 6.50 to 10.28. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal.~|~21 - Safety~|~185B9EBB21A736BBF6C5D1E1479EA30EFC6F1553 96692~|~1~|~1~|~01/NFA~|~ATB Williamsfield Outpost, Construct new 3 Bay Cold storage to include electric for block heaters~|~~|~D7DC1C62986B98EEC9BDB3BB478B3B286E969EF7 92799~|~1~|~1~|~01/NHS~|~Pavement Marking~|~~|~B5694E54ED514F522F81866A210C2ACD823B2A48 75730~|~1~|~1~|~01/IMS~|~Provide for lane continuity in overlap section of IR74/IR275.~|~~|~7985CE0D18CFCE93228755C31D09FA611F060616 75730~|~1~|~2~|~02/IMS~|~Add fourth lane on overlap of IR74 and IR275. Reconfigure eastern interchange of IR74/IR275 to provide lane continuity, that is, IR275 exit on the right instead of the left going eastbound.~|~~|~BF213384DB0BB78936B82AF67E871AB0C00547FC 105167~|~1~|~1~|~01/IMS~|~To upgrade the highway lighting hardware on IR 470 at mile marker 3.22~|~21 - Safety~|~541514B1DC8FE09AA432E0B7D34C317B4777A0A0 105167~|~1~|~2~|~02/NHS~|~This plan split is for the locations on SR 7 in Columbiana and Jefferson counties and on US 250 in Tuscarawas county.~|~21 - Safety~|~214CDED822B475D68729B787EE28EB56437F2924 84839~|~1~|~2~|~02/S<2/LOR~|~80/20 District Allocation/City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~C4FD0D820BB9EE5BFCE654877467A4C2758DE412 84839~|~1~|~1~|~01/NHS/LOR~|~NHS 80/20 District Allocation/City Funding~|~05 - 4R Maintenance - Resurfacing~|~D87D8193142056313360B67F3DFD7421D0F4B782 84839~|~1~|~3~|~03/S<2/LOR~|~100% City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~E61E88D40C5DB5D699C0ACC113D74F33F8A31E2E 119060~|~1~|~1~|~01/NFA~|~All work included in this split.~|~47 - Bridge Preventive Maintenance~|~974CB23601F9A9F0CF121154D8FD81473801C9C1 93206~|~1~|~1~|~01/NHS~|~Remove and replace existing microsilica and latex modified concrete deck overlay on SFN 5704685 MOT IR 70 (Number Nine Road)~|~13 - Bridge Rehabilitation~|~0E2A3922BB4485875839D0DDE16846506430F4AA 93206~|~1~|~2~|~02/BRO~|~Remove and replace existing microsilica and latex modified concrete deck overlay on SFN 5703484 MOT US 40 1883 over Chessie SYS RR.~|~13 - Bridge Rehabilitation~|~8510B3E18656FFE04587D1CC5AF1B0AAEC302B3E 115854~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..at various locations in D10.~|~21 - Safety~|~2CF5D407B5B9EE00F6A3A737EBAA7AC1C04D9CC4 107661~|~1~|~2~|~02/S<2/VAN~|~Resurfacing in the City of Van Wert. Federal funds from the District budget with the 20% match provided by the City of Van Wert. All resurfacing on SR 118. Resurfacing on US 127 from the CDX RR at 9.94 to where US 127 leaves US 127 at 11.33 and then on the left side of the road from 11.43 to 11.63.~|~05 - 4R Maintenance - Resurfacing~|~FF3E7C6378CFBD3047A1F73A9474D1B99336CE8F 107661~|~1~|~3~|~03/S<2~|~Resurfacing inside of the Van Wert Urban Area but outside of the City of Van Wert. Federal and State funds from the District budget. Resurfacing on US 127 on both sides of the road from 11.33 to 11.43, on the right side of the road from 11.43 to the north Urban Area boundary where US 127 leaves the City of Van Wert on the left side at 11.63.~|~05 - 4R Maintenance - Resurfacing~|~F9A88D7E161310589DD6B7B2706E9F24014D488D 107661~|~1~|~4~|~04/NFA~|~Resurfacing on SR 709 in Van Wert County which is a Rural Minor Arterial which cannot use federal funds for resurfacing. All funds from the District budget.~|~05 - 4R Maintenance - Resurfacing~|~285023D59ACDFC3219A7ADB7857B67308592D212 107661~|~1~|~1~|~01/STR~|~Resurfacing in Van Wert County using district preservation funds. Work on US 127 from the North Urban Area Boundary where US 127 leaves the City of Van Wert on the left side at 11.63 to the end of the project at Marsh Road 12.25. Also, all resurfacing on US 224.~|~05 - 4R Maintenance - Resurfacing~|~ECA11912107D277C105959DF0FCCC280166F2EBD 107661~|~1~|~5~|~05/NFP/VAN~|~Items funded 100% by the City of Van Wert such as pavement repairs and auxiliary pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~B2AC3F9C8FD27E91B7B15B127E35A64F38FCA3AF 88830~|~1~|~1~|~01/NHS~|~Resurfacing on the National Highway System (NHS)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~374F7A02B428BD67FE9D3FEA6FA0390DFB4E13E5 88830~|~1~|~2~|~02/SAE~|~Recessed-Wet Reflective Pavement markings (and WR Work Zone PM?s) funded partially be Safety (Delta Cost portion). The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. This difference in cost is the delta cost. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal.~|~21 - Safety~|~AA3E4A7A7F71725C257F46BD6F2CE5E5B44D692E 88830~|~1~|~3~|~03/NFP~|~Repair piers, barrier wall, and asphalt wearing surface due to a collision. ~|~13 - Bridge Rehabilitation~|~8C74D01536E9AF17573E7E4E3A5B83A208D8EEAB 88830~|~1~|~4~|~04/NFA~|~retroactive fuel price adjustment ~|~13 - Bridge Rehabilitation~|~397D49677A439402775FF57FAD55381109246016 118783~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs~|~05 - 4R Maintenance - Resurfacing~|~2D48665F6C0E1488303C0C90BE131F2958003E08 99563~|~1~|~1~|~01/S<2~|~Rehab Local bridge.~|~13 - Bridge Rehabilitation~|~58B391E35545B4A3B682A0E06287E0DCB2F4F41E 108779~|~1~|~1~|~01/NFP~|~All work in this project.~|~17 - Construction Engineering~|~7878C85D864F8F306BDAA19938A204B065B1E77B 115001~|~1~|~1~|~01/S50~|~Traffic Signal Upgrades.~|~21 - Safety~|~47BE7ECF472B18BBB25EBE105502093E0282EFC0 102978~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CLA SR 72 SLM 0.00 to 4.82.~|~05 - 4R Maintenance - Resurfacing~|~71262A1A85156116A59AADD4B8AFABA1415903D1 102978~|~1~|~2~|~02/S>2~|~Smooth seal on large urban route: CLA SR 72 SLM 4.82 to 6.42~|~05 - 4R Maintenance - Resurfacing~|~29AD59BC50FEEE1A2BAD970E8043E4E4C54927A4 114944~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate roadways~|~13 - Bridge Rehabilitation~|~7334A18921524C2192097C57E2A149D66F2E49DB 114944~|~1~|~2~|~02/NHS~|~Bridge Repair NHS~|~13 - Bridge Rehabilitation~|~5707CC928CDC978586F6190A2F5A64CA1722F149 114944~|~1~|~3~|~03/STR~|~Bridge Repair STP Rural~|~13 - Bridge Rehabilitation~|~9B8E2AA432D0576B2E4074B49988D2F301630E32 99429~|~1~|~1~|~01/NFP~|~Widening of CR17 (Cleveland Massillon Road) from Shannon to Weber, in the City of Norton, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~A87ADCA76A011FB9BC0671FF26CC875CBFCAAD48 125956~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2032. Various routes and sections in D10.~|~21 - Safety~|~AED1D5F27E7DB4140F510FAB6DF5993333C231C4 109635~|~1~|~1~|~01/STR~|~Emergency repair on BRO 41 4.18~|~04 - Reconstruction - No Added Capacity~|~519FF9B68F9ACCE6F510F534E09C62AD219E2BCF 85526~|~1~|~1~|~01/IMS~|~Plan split for system preservation paving work.~|~05 - 4R Maintenance - Resurfacing~|~C379927034F27E4D15A752EB4CA7DD34CD8BC5BD 93818~|~1~|~1~|~01/S>2~|~Resurfacing in the City of New Franklin. STP Urban Segment from SLM 4.91 to SLM 5.18.~|~05 - 4R Maintenance - Resurfacing~|~7DD6A904E81D5C105A1B1922603298E0E598A839 93818~|~1~|~2~|~02/STR~|~Resurfacing in the City of New Franklin. Rural segment from SLM 2.38 to SLM 4.91.~|~05 - 4R Maintenance - Resurfacing~|~91C9E617CEE438B919452B0625722C71B68A0BB2 117434~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DAEEADBC9A53EECB6AF381B85882DCADB97B90AD 96318~|~1~|~2~|~02/S<2~|~Resurfacing: Urban SLM 0.57 - 1.10 (Ashland)~|~05 - 4R Maintenance - Resurfacing~|~2D8FA507E63208756477A08E1D22A0D3B88F17C8 96318~|~1~|~1~|~01/STR~|~Resurfacing: Rural ASD-58-1.10 to 14.09, MED SR 301 8.61-10.17~|~05 - 4R Maintenance - Resurfacing~|~8CD9ACCED1E7C4E97B1AD3BA3BE7EA9439239569 96318~|~1~|~3~|~03/STR~|~Structure Work: ASD-58-1.18, ASD-58-4.22, ASD-58-4.43, ASD-58-5.94, ASD-58-6.26, ASD-58-7.98, ASD-58-13.30, MED-301-9.84~|~13 - Bridge Rehabilitation~|~A33D181830E0CCE6A603DFC98E58C0120A67AD09 96318~|~1~|~4~|~04/S<2~|~Structure Work: ASD-58-0.60~|~13 - Bridge Rehabilitation~|~04881973CDCC44445B1C0776CA63399C9C37BEDF 100302~|~1~|~1~|~01/STR~|~BRO-505-6.03~|~10 - Bridge Replacement~|~67C6A402715C4D62A8759AF5F7BE6BCAAB0C8C93 24980~|~1~|~1~|~01/NHS~|~Replace existing box structure (JEF-7-3095, SFN 4101561) with new structure. The structure carries SR 7 over a coal conveyor and coordination will be required with the conveyor owners.~|~13 - Bridge Rehabilitation~|~4246606A0FED01FC5F573A3B26FC5E3CC7A9D507 126325~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~E60913F605C5D1CE51B45F2A7A5600C2028EA86F 96958~|~1~|~1~|~01/MPO~|~Mill & Fill on CR 39.~|~~|~E7CFEDFFDD8C47FDDF6C8D2EAB28270FFCFFC7EF 100615~|~1~|~2~|~02/NFA~|~Asphalt resurfacing with repairs on HOL-754 from 0.96 to 6.72~|~05 - 4R Maintenance - Resurfacing~|~072819DBE7BC707B2E59917029C696D5B4A6A766 100615~|~1~|~1~|~01/STR~|~Asphalt resurfacing with repairs on HOL-754 from 0.00 to 0.96.~|~05 - 4R Maintenance - Resurfacing~|~059BC4D662B8753B1A3B2BB2C8E400CC2BFA6A4C 91567~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (TUS-93-0336, SFN 7904029) with a new slab bridge or four-sided concrete box.~|~10 - Bridge Replacement~|~1893467881446FE149B41DC90EFD6D73A871402E 115038~|~1~|~1~|~01/ERD~|~Ferry Funds plan split~|~26 - Ferry Boats~|~37A06A5CF0A52A9E11874A9A813C6B96B4B6F06A 105902~|~1~|~1~|~01/NHS~|~Plan split for urban paving work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~8FA9C82867E4CEFA5A96596D5DC1EA87156EB34D 105902~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~771AC868FD2E1D22222309FD5709F6C10E240F73 123964~|~1~|~1~|~01/S50~|~Resurfacing along CR 46 from SR 7 to TR 376 - 80% (4TA7/BH11) Federal funds/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~B9512CC5D5635877FFA7741071DD2C0D69289901 97776~|~1~|~1~|~01/BRF~|~Replace super structure SFN 5738121 MOT CR46-0124 Hample Road over stream.~|~13 - Bridge Rehabilitation~|~38BE753550FC28B7B9A15491E33D20A64F6AFEAF 93539~|~1~|~1~|~01/NFA~|~Demolish and construct new salt building - 100% state facility funding~|~44 - Other~|~46B8A4F59546F7652CFBF2510446AA4A5FE77197 113488~|~1~|~1~|~01/MPO~|~Milling and resurfacing on the walking/bike path in Tom Cloud Park in Huber Heights.~|~28 - Facilities for Pedestrians & Bicycles~|~963619899A2182FAB7B05004EB58663F4A58EE40 86479~|~1~|~1~|~01/NFA~|~100% local funding for all work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~207F78FA4C9C4816FA7CF23E9EEABCC7422A8B4B 86479~|~1~|~2~|~02/NFP~|~Bridge work on SFN 1800841; Herman Ave over US-6~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AA404BBD2665540043BA0A7CBF0B20718EDAF9A0 116836~|~1~|~1~|~01/ENH/POLA~|~Construction of a shared multiuse path.~|~28 - Facilities for Pedestrians & Bicycles~|~890FCEB7C5D6E530E6EC287C1F3E794D2C1CD480 111320~|~1~|~1~|~01/NFP~|~Reconstruct S. Industrial Parkway.~|~04 - Reconstruction - No Added Capacity~|~A55AB57A3DD5BE2288C62A680468E041E0358FB9 121576~|~1~|~1~|~01/MPO~|~Plan split for federally eligible work items in construction~|~05 - 4R Maintenance - Resurfacing~|~364E2C43226D48C5237166341736DCDE30E99F73 121576~|~1~|~2~|~02/MPO~|~Plan split for 100% locally funded items~|~05 - 4R Maintenance - Resurfacing~|~59E320C4B5E2C13F020B145E6C91F2FB83873348 126306~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~AFC99A2CD4E024C1390AC17C48D322754D2FA40D 97156~|~1~|~1~|~01/NFP~|~Construction of a parking lot next to ATB SR 307 11.15 at the Lampson Reservoir.~|~44 - Other~|~F3407164181B07FA61169120DCF8889585C6AAC9 115841~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2028.~|~~|~C6CB0DF0581FFB60E4149169229022DDEDAE509C 96988~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~44 - Other~|~F7FA45DCB7DF3641425A296249B6B0998BCD36D6 93606~|~1~|~1~|~01/NFA~|~Sidewalk construction in the City of Hudson.~|~28 - Facilities for Pedestrians & Bicycles~|~3B30E97B7E3F1CBEC72FC6E75E75B7DA06E76C70 112871~|~1~|~2~|~02/STR~|~MAD-56 from 0.00 to 4.69~|~05 - 4R Maintenance - Resurfacing~|~FED912FB61033093D39F251DD3D5D19FA72F5FF2 112871~|~1~|~1~|~01/S5K~|~MAD-56 from SLM 4.69 to 6.19~|~05 - 4R Maintenance - Resurfacing~|~405C2EBC3B607836B49D3AAB2063A61FCB0A4C2B 116014~|~1~|~1~|~01/NHS~|~All work in this project. Funds will be from the Geologic Site Management (GSM) program until the cap is reached then funds from the District Preservation Program budget will be used. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7E7B718755CA92C4BCCCCF977E04C7D4ECE04CD3 83059~|~1~|~2~|~02/BRO~|~CO CC 01 Brdg plan split added for $20,137 for SFN 4401956~|~~|~100CF2BC9DEC664174C2F036A4AA1441BE586460 83059~|~1~|~1~|~01/STR~|~CO CC 01 plan split added. Moved $20,137 to CO CC 01 Brdg for SFN 4401956~|~~|~8FEDE2298780DCA4B691FE238EBFBB4AD9F022A3 93442~|~1~|~1~|~01/NHS~|~Turn lanes on State Route 43 between State Route 261 and Summit Street. Signal interconnect of SR261, Beryl Drive, Cherry Street, and School Street, in the City of Kent. Including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. Westbound left turn lane on SR-261 at Summit Street in the City of Kent.~|~21 - Safety~|~CD2C574F550DEAE9DE1700AF682F1AB75970B8F7 100823~|~1~|~1~|~01/IMS~|~Double microsurfacing to SUM IR 77 19.51 to 21.99~|~05 - 4R Maintenance - Resurfacing~|~2415F8CEB47032A3B388A0C0B363D3B6EAC164CF 84509~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 160 3.50-14.67. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~615E45AE8A971EC7DF3B9E4301426647185DA1DE 84509~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment on GAL 160 3.07-3.50 and GAL 588 10.87-11.74 using a mill and fill treatment. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~855FCF6B67162ACE0740D9023C9CCEC5DB223DCD 121985~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~0C0104B80301E9770067CF370C315B592C94529B 107979~|~1~|~1~|~01/SAE~|~Repair of an existing uphill slide along Wolfpen Pleasant Hill Road by installing a 200' long drilled pier retaining wall.~|~~|~65C55E77BA70315254AFA9838608FF886408F73B 106810~|~1~|~2~|~02/STR~|~Bridge painting project. ATH 13 0.40 (SFN 0500070), ATH 13 2.69 (SFN 0500135) and ATH 13 6.87 (SFN 0500186). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~970D663750D8C68DB90CBF174229DF9F04A7E6AC 106810~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 33 11.07 LT (SFN 0500720) and RT (SFN 0500755), ATH 33 15.60 LT (SFN 0505927) and RT (SFN 0505900), ATH 33 16.27 LT (SFN 0500941) and RT (SFN 0501018). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~2E2FFE150FBD53076D636092D86B08C456C80048 113574~|~1~|~1~|~01/S>2~|~Split for bridge work related to the replacement of the existing structure~|~10 - Bridge Replacement~|~B70DFBA761300AC4FBA74CCA9A5B2966A3D1928A 117730~|~1~|~1~|~01/NFP~|~Elongation of turn lanes on SR 161 eastbound off ramp to Beech Road~|~03 - Reconstruction - Added Capacity~|~D59B54CCB88C63D41F0C6E30F84F907D1F24BD07 107615~|~1~|~1~|~01/NHS~|~FUL-20-9.14~|~47 - Bridge Preventive Maintenance~|~F81F0615636345B8DF8955EE3A3D9E2EF4D30C3D 107615~|~1~|~2~|~02/BRO~|~FUL-20A-2.53~|~47 - Bridge Preventive Maintenance~|~22073B3E3A146F8BF008985C308D0616E5ABAFE2 114498~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~472A295BFD78F7310975E3C56DEF70292D942129 117011~|~1~|~1~|~01/NFA~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~424BD61C9F0DF69E7F1FD09D7BBD6662CF1F0BBA 107853~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-41-21.99-23.54~|~05 - 4R Maintenance - Resurfacing~|~90F7EAAB7EE91C51868C4D9D5DF6A65A25A3DA2A 107853~|~1~|~2~|~02/S<2~|~Urbanized Area Plan Split: FAY-753-12.58-12.78~|~05 - 4R Maintenance - Resurfacing~|~A2B9A563A741378C956E0FFE6BE891670E6A5BA0 107853~|~1~|~3~|~03/NHS~|~Priority System NHS Plan Split: FAY-35-0.00-2.58~|~05 - 4R Maintenance - Resurfacing~|~5C4F6F4084A8147E2DD735A02A39BCF53F47A4D0 125600~|~1~|~1~|~01/NHS~|~Bridge hit number 1~|~13 - Bridge Rehabilitation~|~AD4F523CF389CEC143212473F9018FE0B46BC6F0 107013~|~1~|~1~|~01/NFP~|~Parking Lot Plane and Pave and Mohican Lodge.~|~44 - Other~|~D05F8A10CD12B78D108361D16E6E74940E392726 119750~|~1~|~1~|~01/ENH/WIL~|~Construction of a shared use path along Davids Drive from SR 134 for approximately 2.2 miles.~|~28 - Facilities for Pedestrians & Bicycles~|~4E924EDFC694FC60FA66D4284498A32AAADED30E 117895~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FB335C0E2CBBE201C8DF7006079279988B2FE21A 104130~|~1~|~1~|~01/STR~|~Storm Sewer repair on the campus of Central State~|~~|~3E2383B37122926C2AB6C474B7C7AAB3A9884DE3 98570~|~1~|~1~|~01/NHS~|~Two Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5D4406A8CEB3C686DCFE24049E841373F2F9F2CA 98570~|~1~|~3~|~03/SAF~|~Funding for center Line rumble stripes Outside of Litchfield, Mallett Creek, and Medina.~|~21 - Safety~|~FDFEEE2522FCD9AADFC2B3AC02A0FD14DE6A2AB0 98570~|~1~|~2~|~02/NHS~|~BRIDGE WORK: MED-SR-18 06.590 (SFN 5200636) OVER MALLET CREEK Preventive Maintenance:? Expansion joint repair/replacement (048) ? Deck Sealing (051) Minor Rehabilitation ? Bridge railing upgrade/repair (061) MED-SR-18 06.870 SFN (5200660) OVER CSX RR Preventive Maintenance ? Deck Sealing (051) Reactive Maintenance ? Conc patch(non-deck) (010) ? Deck patching(conc) (049) ? Exp jt repair/repl (048) Minor Rehabilitation ? Bridge railing upgrade/repair (061) ~|~13 - Bridge Rehabilitation~|~4ABEE27528DB45BEA7B44AB97793C7263F82155D 86594~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn SR763, project is located 0.78 mile south of the intersection with SR353. It is proposed to replace the deteriorating and structurally deficient corrugated metal arch. 0804207 BRO SR763 11.92 Intersect: Trib W Fork Eagle Creek100% state 01/NFA/BR/State~|~10 - Bridge Replacement~|~A9B259F8EF5CE6C3AB8D21086D2BDA775989D8BD 100815~|~1~|~1~|~01/NHS~|~Resurfacing of ATB US 20 from 6.35 to 10.41.~|~05 - 4R Maintenance - Resurfacing~|~21DE2FC57680D8D7129C0AC81D813692B6185D4B 100815~|~1~|~2~|~02/S<2~|~Resurfacing of ATB SR 84 from 14.23 to 19.75.~|~05 - 4R Maintenance - Resurfacing~|~01E5E7BAAD3E6DE76E2E388427B013AD03ECA5F1 100815~|~1~|~3~|~03/NHS~|~Minor rehab to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~8B9C06609B47C8485B8A0D727AD91D0B6676D2B6 101248~|~2~|~4~|~04/ENH/HUBB~|~Adding sidewalks along Myron St in the City of Hubbard.~|~28 - Facilities for Pedestrians & Bicycles~|~50E55BA7C0FED37C99E0FB99C50E60302D296888 101248~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~85F9296DBB9500AEF0CDF653DAFF7A2B701A78AB 101248~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E770035E12228FEB4E0AE04EAB0559A0E8CFE063 101248~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~13 - Bridge Rehabilitation~|~E6F45CF9BC0D555627C8A152353E617F3BC8BF89 92630~|~1~|~1~|~01/NFA~|~Project consists of environmental remediation of the ODOT Miamitown Outpost. Remediation consists of chemical injection of material to neutralize underground contamination.~|~20 - Environmental Only~|~DC86BBDD3309E40D6FE4A880F71051A80EC16272 117566~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 147 9.93. Drilling for a geotechnical exploration.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3943DC7E4D6AD5729ABED37FEE8F123941468C44 125967~|~1~|~1~|~01/STR~|~Culvert replacement.~|~66 - Resilience Improvement - Highway Project ~|~4F2ADEC2EF0215254221DF50BA492A2202A121C3 103654~|~1~|~1~|~01/BRO~|~Replace Bridge~|~10 - Bridge Replacement~|~D9E47EAA5F6B63EB3A26E98365D3EFB52EEA50C3 6170~|~1~|~1~|~01/S<2~|~Urban paving - 80/20 - MPO/City of Elyria~|~~|~75900DCB703B535B3A8ADBF355FC7FFE58694365 113198~|~1~|~2~|~02/NHS~|~Pavement work on DEL-36-17.64-18.41 to clean up MOT lane shifts.~|~05 - 4R Maintenance - Resurfacing~|~8B8AD6CFF2A915AAEEDF1770A8DCFAE931F2A547 113198~|~1~|~1~|~01/IMS~|~Replace superstructure on DEL SR 36 over IR 71~|~13 - Bridge Rehabilitation~|~8F5F3FDCDF0BD27F87EE3904B69B8AA3A96D5E6F 113198~|~1~|~3~|~03/NHS~|~Aesthetic treatment of vandal fencing to be paid 100% by Berkshire Township~|~13 - Bridge Rehabilitation~|~CD09DD514F8D5C43E2FBFE55D3B7756777F39193 107831~|~1~|~1~|~01/STR~|~All the work in the resurfacing project is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~9BCF2F130431C98134732298106D46FD4DCC01B1 88224~|~1~|~1~|~01/MPO~|~WIDEN AND RECONSTRUCT ROADWAY on South Dixie Drive from Cresthill Drive to Elva Court FROM 3 TO 5 LANES, INCLUDE A TAPER AT ELVA COURT~|~04 - Reconstruction - No Added Capacity~|~D88831020714B690D272E8EFBD7DE9E727E667CD 102976~|~1~|~1~|~01/NHS~|~Microsurface on:CHP SR 4 SLM 7.98 to 12.24~|~05 - 4R Maintenance - Resurfacing~|~CDBD197992B4D46170D362177414BA6CD2A62BFA 102976~|~1~|~3~|~03/S<2~|~Microsurface on:LOG SR 117 SLM 0.00 to 2.01SHE SR 29 SLM 14.47 to 14.55~|~05 - 4R Maintenance - Resurfacing~|~C85966DBAFF8EA1637D4EE6373CE33800AEF4ADC 102976~|~1~|~2~|~02/STR~|~Microsurface on:LOG SR 117 SLM 2.01 to 5.83SHE SR 29 SLM 7.64 to 14.47SHE SR 274 SLM 14.87 to 15.23~|~05 - 4R Maintenance - Resurfacing~|~1ECF94E3BF715810DA202F8B7B4C7AFE5713D149 111125~|~1~|~1~|~01/STR~|~Slope failure on WOO-281 over I-75~|~21 - Safety~|~D5D2046245F038AC4174A6F54B6509E2C2DE6885 86744~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for all work using TRAC funds.~|~08 - Bridge - New Construction~|~C1DCC1B6842C3C7826B4663EC9DF2467A4B97E36 109544~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/PV for D05 Crack Sealing FY2028~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8C2D14C7F9858ADC829F831196D206D3D5392B97 82438~|~1~|~1~|~01/IMS~|~Pavement planing and resurfacing with asphalt concrete on Interstate 75 from SLM 7.29 to the South Corporation Limit of Dayton (SLM 10.42).~|~05 - 4R Maintenance - Resurfacing~|~563477BA7D8810AD5B634C868D79FB04C1C7F220 117099~|~1~|~1~|~01/ENH/CCEO~|~"01/ENH/OT/CCEO" - construction of shared use pathway along CR 621.~|~28 - Facilities for Pedestrians & Bicycles~|~DDB12753B1F83405B03CEFE7CF4712F3DEC0FA5E 117099~|~2~|~2~|~02/NFP/CCEO~|~100% Local Plan Split for non-Federal funded resurfacing work.~|~28 - Facilities for Pedestrians & Bicycles~|~110D9B68B4C4846C69502EC7A62750E059DF51FC 93182~|~1~|~1~|~01/IMS~|~Plan Split for SUM IR 76 0.00 to 15.42~|~~|~79E9565C4A362729836C3A20536AC3BC437CABA7 108513~|~1~|~1~|~01/STR~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~92EC683A363CAD2545A46B714EC8F4C050599B31 124219~|~1~|~1~|~01/NHS~|~Interchange Improvement at Orange Rd and US 23~|~03 - Reconstruction - Added Capacity~|~F7D2819F487F86E36B1DB5FC16A92C64CF478DA4 83555~|~1~|~1~|~01/SAF~|~Widening SR 39 from the RJ Corman railroad tracks to 7th Street to provide a two way left turn lane. Widening the roadway will provide left turning vehicles a safe refuge while turning from SR 39 into drives and side streets, thus reducing opportunities for rear-end collisions. Using 80% federal safety funds (4HJ7) and 20% Local match (4BG7) (City of New Philadelphia).~|~21 - Safety~|~C8BC454201F3218F4BFD99A6ADC33FF98E5946AC 108325~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. MRG 78 13.90. DSR MRG-005. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F6B528447C87356D4A83DD3CB38D004BE604927 122321~|~1~|~1~|~01/ERD/BARB~|~Sidewalks from E. Cassell Ave to 1 St NE.~|~28 - Facilities for Pedestrians & Bicycles~|~3402176C90BA572CC2F5F3FD4F1347FB2C9EDA31 122321~|~1~|~2~|~02/ERD/BARB~|~Sideswalks from E. Tuscarawas Ave to E. Cassell Ave, E. Cassell Ave, E Park Ave, and E Tuscarawas Ave. (CDBG eligible)~|~28 - Facilities for Pedestrians & Bicycles~|~4E05F6B3C3496FB2CED73DBA710947C622ED4B72 112940~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-47-2.95-8.34~|~05 - 4R Maintenance - Resurfacing~|~EC2098E0083DD8DE11D2407779812452B7EFA754 107126~|~1~|~1~|~01/NHS~|~Urban Paving - City of Middletown - Germantown Road to N. Corp.~|~05 - 4R Maintenance - Resurfacing~|~129508CCA79CF9233714797B53BC6515C5FF92DD 107126~|~1~|~2~|~02/NHS/MIDD~|~Items to be covered 100% by the City of Middletown.~|~05 - 4R Maintenance - Resurfacing~|~19197FC9C11C066561D0D2B207185DFF26CD67DD 117787~|~1~|~1~|~01/NFP~|~Reconstruction of the Rest Area Parking lot, Sidewalks, ADA ramps and other miscellaneous items~|~44 - Other~|~8EE2552499EEBF6C3B012B1D7015498573F28DE1 92830~|~1~|~1~|~01/S<2/DEF~|~This split is for work elibible for funding from the Small Cities Program. The City of Defiance will provide the non-federal funds.~|~04 - Reconstruction - No Added Capacity~|~49713F91BEA14292538F3A0CAC7A01E5BD2DEFA5 92830~|~1~|~2~|~02/S<2~|~This is for urban paving work. The federal funds are from the District Preservation Program SAC 4PF7, and the 20% match is provided by the City of Defiance SAC LNTP.~|~05 - 4R Maintenance - Resurfacing~|~78A5481B096AEE5378B88EA2480D09FD8B42B0BC 97442~|~1~|~1~|~01/SAF~|~INstall overhead flashing beacons and converting 2-way stop to all-way stop intersection.~|~21 - Safety~|~8FBB104F8EA932FD4350168C7B92718F2E9F13FD 116653~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr MED SR 18 15.05 TO 15.92.~|~05 - 4R Maintenance - Resurfacing~|~69606612F042C476D3764FA534D6B879603E42D9 116653~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs MED-57-17.80 to 20.718Bridge maintenance work included with this plan split.~|~05 - 4R Maintenance - Resurfacing~|~3EECE5117B8367A43E0935838FA94580985EAC4B 118471~|~1~|~1~|~01/BRF/WCEO~|~Replacement of Bridge WAR-CR 134-3.76 (SFN: 8332991) with a three-sided precast culvert.~|~10 - Bridge Replacement~|~FC6AB2F5C4C23562693FCAB0FF01CFD07CAF8B92 105000~|~1~|~1~|~01/SAF~|~This split will cover all work to install cable rail.~|~21 - Safety~|~428ABC8C248EEFEB6F4C9CB389E32870D5B15C9F 95849~|~1~|~1~|~01/NHS~|~100% State Funds - Sinkhole repair~|~44 - Other~|~4F8D65A2847F79FE47A93A4E0C96324D93167510 87757~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Cracksealing on Lic-IR 70-09.65 to 15.96~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DC53040831844E91800AD97413D1C0FD95A64707 87757~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Fai US 33 22.39 to 24.86; 2) Lic US 40 00.46 to 04.70; 3) Mus SR 16 11.70 to 14.86; 4) Mus SR 60 13.02 to 15.02;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DF26B53EFD5A5AC1A17B249F714B0D3A7EE50F96 87757~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Mus US 22 18.14 to 19.78; 2) Mus SR 60 11.96 to 13.02;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B9C24C148B6F9A36FB57A2B2115FEDB0539D09C 87757~|~1~|~4~|~04/STR~|~"04/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Fai SR 37 25.27 to 28.20; 2) Mus US 22 19.78 to 26.62; 3) Mus SR 60 08.03 to 11.96; 4) Mus SR 146 25.65 to 33.76; 5) Per SR 37 00.00 to 08.30;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0E3AB105A20FCA0DB79F2A2666C776C996E603CC 87757~|~1~|~5~|~05/NFA~|~"05/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Cracksealing on: 1) Mus SR 313 00.00 to 07.13; 2) Mus SR 376 00.00 to 05.30;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF5C37431A8C0EB116F5B02B67C244197AFE5E7D 107203~|~1~|~1~|~01/SAF~|~Signal replacement.~|~21 - Safety~|~C23450B33FD00AF5709DA9DA8790D292D6A58F4A 110295~|~1~|~1~|~01/MPO~|~To provide sidewalks on both sides of Solida Road, through the Village of South Point.~|~28 - Facilities for Pedestrians & Bicycles~|~7350D245EAE3AE8E2283403F9711B6B62E299F15 106558~|~1~|~1~|~01/NFP~|~Plan Split~|~44 - Other~|~677E19911F6FB684DF7789A46F1DBB5D7ABECC4C 77886~|~1~|~3~|~03/NHS~|~Plan Spit for SFN 7803249 and 7803273 TRU US 62 8.73 L&R over Yankee Creek.~|~13 - Bridge Rehabilitation~|~1A3974C5F1ADABA12F3C6BB74B832E5A5FDACF1B 77886~|~1~|~4~|~04/NHS~|~Plan Split for SFN 7803133 & 7803192 TRU US 62 04.82 L&R over Little Yankee Creek~|~13 - Bridge Rehabilitation~|~655E6BA93875E7CDF7D9BD1897481B1E3B08BC4E 77886~|~2~|~5~|~05/IMS~|~Widen and replace supersturcture for SFN 7804326 and SFN 7804350 TRU-IR 80-9.56 L&R.~|~13 - Bridge Rehabilitation~|~229548654A17E82FA426ABE33DFDF7DD44E99B80 77886~|~1~|~2~|~02/NHS~|~Plan Split for TRU US 62 4.80 to 9.26~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BA3482ED525C7264BFFE43EDCEAE435D2D9633A4 77886~|~1~|~1~|~01/NHS~|~Plan Split for TRU US 62 4.58 to 4.80.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6FEE3938B529E1B4E5A4A5CDEAB6D5851F854744 98832~|~1~|~1~|~01/IMS~|~Split for upgrade work~|~44 - Other~|~1B137FF8A85EC43C975FBA375C192DBEF9326975 98832~|~1~|~2~|~02/IMS~|~Split for guardrail repair~|~44 - Other~|~4E0EF89C1B580845CC5E8114C5097A7758CEC10F 115729~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of LIC SR 79 04.57 (SFN 4508436) carrying SR 79 over South Fork Licking River.~|~13 - Bridge Rehabilitation~|~77979C67EE5C9588D21FE07DDEE7B754ED2750B9 99471~|~1~|~1~|~01/MPO~|~Resurfacing of Cleveland Avenue (CR-66) from Wright Road to SUM County line, in Lake Township, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~1B05A9AC70E95E6F60A881A27A4E29935AEA6DCF 126911~|~1~|~1~|~01/SAF~|~PM on various routes.~|~21 - Safety~|~CEB80BFF4C70570A3F055C72C3DFD9E13EBD86A8 84988~|~1~|~2~|~02/NHS~|~100% utility cost for waterline replacement~|~13 - Bridge Rehabilitation~|~3AFFBF7A645016737BD467661BB240B8C6160AE5 84988~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for the slope repair~|~13 - Bridge Rehabilitation~|~A3E1AA10495CDF38B04501FF375C27DAD5F9B920 115500~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~44CBA1D515F523D20637576F84482B37AE601343 121071~|~1~|~1~|~01/STR~|~Resurfacing SR 331~|~05 - 4R Maintenance - Resurfacing~|~2D11B259BEC799B3635D1E36541859C8B8B5E37A 123505~|~1~|~1~|~01/IMS~|~Partial Depth Pavement Repairs ASD-71-0.00 to 8.00 and RIC-71-15.455 to 20.636~|~05 - 4R Maintenance - Resurfacing~|~86423C427E1477D610C7914663571AEAA9BB0448 97410~|~1~|~1~|~01/NFA~|~Replace SFN 7633904 STA-TR 118-6.05 Freed St SE over Hugle Run~|~10 - Bridge Replacement~|~08ED1558FAF3E70D6BF229AB37BCEB8D4E542507 97410~|~1~|~2~|~02/BRO/NCAN~|~Replace SFN 7666187 STA-TR 196-0.06 Easthill St SE over W Branch Nimishillen Creek (City of North Canton)~|~10 - Bridge Replacement~|~02A30C175A45261AE7BE81CA18A254B66A4D0DAA 97410~|~1~|~3~|~03/S>2/MASS~|~Replace SFN 7670907 STA-MR 1400-0.55 17th St NE over Sippo Creek (City of Massillon)~|~10 - Bridge Replacement~|~3871078286AA4610330B786BA86996C94BB4AABC 114979~|~1~|~1~|~01/STR~|~STP Rural - Bridge rehab including SDC overlays, patching, deck edges, pier encasement, etc.~|~13 - Bridge Rehabilitation~|~403C247024B5963DCD6E6576E7E8F7148BDA18F9 114979~|~1~|~2~|~02/IMS~|~Interstate - SDC overlay~|~47 - Bridge Preventive Maintenance~|~D8A6348495AA7C104EF6C110B9AA4DE7013FB60E 114979~|~1~|~3~|~03/STR~|~Culvert repair~|~04 - Reconstruction - No Added Capacity~|~D14A421F5493FEFE5E8BD31004508B270393E4AC 107580~|~1~|~1~|~01/NHS~|~Plan Split for pavement resurfacing on BUT-4~|~05 - 4R Maintenance - Resurfacing~|~B3E6BDE7CFF41CE39792A9CE9A46FA975B05C4CD 107011~|~1~|~1~|~01/IMS~|~Mowing Contract~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~98AE2FC22EFBF7F340BEB0C22E0D62C1431B8FE8 121506~|~1~|~1~|~01/IMS~|~Slide repair along HAM-275~|~66 - Resilience Improvement - Highway Project ~|~3A521440C9E1526E985544E9E1192CF8A43C2D64 106708~|~1~|~1~|~01/S>2~|~Replacing the linked culvert.~|~04 - Reconstruction - No Added Capacity~|~AB730589478CA85EF2188E7C57618C1F68CCD125 106708~|~1~|~2~|~02/NHS~|~Median catch basin repairs along TRU SR 5 from 12.43 to 12.93.~|~04 - Reconstruction - No Added Capacity~|~872491116498F8E673806797FEDEB4301F764E3D 92710~|~1~|~1~|~01/MPO~|~Tallmadge Rd CR18 9.21-10.4~|~05 - 4R Maintenance - Resurfacing~|~B8704E5A35F73B02AC37A4C85B3A8CAA83861E7A 92710~|~1~|~2~|~02/MPO~|~Tallmadge Rd CR18 9.01-9.21~|~05 - 4R Maintenance - Resurfacing~|~B99BDA078B4056FEADA2CFDE6FFC7E674DEC3E01 87034~|~1~|~1~|~01/SAF~|~Maintenance contract for highway lighting in District 8 for FY2016~|~~|~3A72A28CF5554816B461049E43B295D24A0E058C 77372~|~1~|~3~|~03/NHS~|~Structure replacement, added capacity (40% of cost)~|~10 - Bridge Replacement~|~FBCA308347FB61E63D1F7E9B2735193CD5AF6156 77372~|~1~|~4~|~04/NHS~|~Structure replacement at 100% State funds (Part 3)~|~10 - Bridge Replacement~|~7623124297F3919A77859719ED684CBB3730D2B9 77372~|~1~|~5~|~05/IMS~|~Replace deck on structure FRA-70-1301L (Existing width)~|~13 - Bridge Rehabilitation~|~99F72141E13FD861FA3B60FE281799093098B5D9 77372~|~1~|~6~|~06/MPO~|~MORPC/Columbus funding for aesthetic enhancements on High St and Third St bridge caps, Fourth St bridge, also landscaping along Fulton, Third and Fourth Streets~|~04 - Reconstruction - No Added Capacity~|~A52CFDE4A6CF242921F838038BFB1595A82448F6 77372~|~1~|~1~|~01/IMS~|~Pavement reconstruction, both existing and widening for items not specifically identified in other splits. Includes work on High St, Fulton St., Third St., Fourth St. and Livingston Ave.~|~04 - Reconstruction - No Added Capacity~|~96E2B5BF11C5DFB75DE35D5D1CD15AD4E746CD58 77372~|~1~|~8~|~08/ENH/COL~|~Incremental items - Columbus to pay the difference above standard items. Granite curbs, brick crosswalks, light poles, signal poles, pedestal crosswalk signs~|~04 - Reconstruction - No Added Capacity~|~00A126FDAF4C0F4BE9E1CA2AAE167BE05F4E0ACD 77372~|~1~|~2~|~02/IMS~|~Structure replacement, no added capacity (60% of cost except 100% of FRA-70-13.01R)~|~10 - Bridge Replacement~|~9C26C6CACBF7B463507439F97D8CE4618BD66479 77372~|~1~|~7~|~07/NHS/COL~|~Items to be paid with 100% City of Columbus funding~|~04 - Reconstruction - No Added Capacity~|~0C84680EAFF305C282A6A4268C6918D93F61E302 77372~|~1~|~9~|~09/IMS/Util~|~Utility work to be paid 100% by each utility as a lump sum contribution. Any overages will be paid with District Preservation funds.~|~04 - Reconstruction - No Added Capacity~|~177FBDB6AE4A5B467692D9CFB373E0BEC1F6B413 118859~|~1~|~1~|~01/NFA~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~760D585018CFF56E8A7927E16F85ADCCC33150BC 104947~|~1~|~1~|~01/NHS~|~FRA-23-0.25 L&R deck overlay and repairs~|~13 - Bridge Rehabilitation~|~791AC2E6910B7A33A6ECAFC1F36E3ED700DB2D73 109857~|~1~|~1~|~01/NHS~|~PIK 32 20.14-28.42~|~05 - 4R Maintenance - Resurfacing~|~8A936EB0384469F7CE05FA0AC170C41DE836999A 120387~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~FFFCF5C9DA7D01ED001542AF6CD4C049C357DBA2 114836~|~1~|~1~|~01/S>2~|~FRA-674-0.00 to 2.05, 2.14 to 2.21~|~05 - 4R Maintenance - Resurfacing~|~B50F05FC976806E06DFFD9BA1BBF780F8CCE4B69 100865~|~1~|~1~|~01/IMS~|~Replacement of deteriorated noise panels.~|~44 - Other~|~E6590B688F69EE1FC76A4CCA76675BD3A42C6F0A 96463~|~1~|~1~|~01/NFA/UTLC~|~"01/NFA/PV/UTLC" - Safety High Risk Rural Roads Funding - 4HJ7 (90% Federal) / 4BG7 (10% Local) - $265,000.00 Federal CAP - Resurfacing - Lic-TR 35-00.00 to 02.45;~|~05 - 4R Maintenance - Resurfacing~|~DD77E5B0B38602443D14ABB90637EF5330DB82E0 100992~|~1~|~1~|~01/NHS~|~Smooth Seal SR 725 and SR 741 in Montgomery County: MOT SR 725 SLM 15.00 to 18.18 MOT SR 741 SLM 0.00 to 3.61~|~05 - 4R Maintenance - Resurfacing~|~1E37ED0D086C20692C68D174AF7D0EE7CA379B0E 124948~|~1~|~1~|~01/MPO~|~Plan split 1, for OKI pilot paving program eligible expenses.~|~05 - 4R Maintenance - Resurfacing~|~281ADC51114F75B5618EF032EB967AA0746A4643 110518~|~1~|~1~|~01/BRO~|~Bridge plan split~|~13 - Bridge Rehabilitation~|~DEC2059AABD5CB1F4DE6108EEFCAA66C72E53A63 111316~|~1~|~1~|~01/MPO~|~Minor bridge work > 20' structure.~|~13 - Bridge Rehabilitation~|~A4612619E9DB15E6C69A05763C05D71B2EA3FDFB 113852~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~3825DDCAB6B28BF6E0CB7F0763883F0CE0BAE3E2 99765~|~1~|~1~|~01/STR~|~Scioto FLAP Phase 1 CR10 (2.4-3.7)~|~05 - 4R Maintenance - Resurfacing~|~F2FB9D7D8C546D3A249FAF73625DEAB7AD581E44 121706~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs MED-71-0.00 to 6.062~|~05 - 4R Maintenance - Resurfacing~|~9C9EC517B675A6C8CE28DCB9EFEC0375BEC28EF9 90877~|~1~|~1~|~01/S<2/NEWC~|~"01/S<2/OT/NEWC" New Concord SRTS project to replace and add new sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~66A3D7B07D0C063DABA33CF79D1A46DB6231D3AB 123534~|~1~|~1~|~01/IMS~|~IMS conduits linked~|~04 - Reconstruction - No Added Capacity~|~D9FC9597D30A30EF4EF2601585C2BEDF031B8C16 123534~|~1~|~2~|~02/S>2~|~Lrg urban Conduits linked~|~04 - Reconstruction - No Added Capacity~|~58ADD480B4310AA67682C106A554843A57F2C2B0 123534~|~1~|~3~|~03/NHS~|~conduit linked~|~17 - Construction Engineering~|~CE33113EA29494CE520D9C73FF010B737BAEEF1A 123534~|~1~|~4~|~04/NHS~|~conduits linked to NHS~|~04 - Reconstruction - No Added Capacity~|~D882F4D8454DD66C87E55D6C0CA7832EBC65CC94 88962~|~1~|~1~|~01/NFA~|~Salt storage building demolition~|~~|~A0C347228DED11084CA834BC776CD33E639ED205 114661~|~1~|~1~|~01/NFP~|~PM (A) FY27~|~21 - Safety~|~0E6E9D4CFF057AB8B5C4651682AF57285F1F4D67 113650~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " Intersection upgrade of SR 204 and Tollgate Road.~|~21 - Safety~|~2D73039A29CF32B802B6E86AAEBF56B650FD6B06 126357~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~1B83016917A546CDA9AEBC4DF7D9B25909ECDE02 101665~|~1~|~1~|~01/NHS~|~Established plan split as "01/NHS/BR/ " for Mus-93-12.84~|~04 - Reconstruction - No Added Capacity~|~906B2D0A48EBBDC0D8871106199184C74B7DCAB6 95972~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~44 - Other~|~A35EA3D45013B67BC9360D0C0508769C5BF1FEF7 125743~|~1~|~1~|~01/NFA~|~Pavement Repair GAL SR-790~|~05 - 4R Maintenance - Resurfacing~|~FC30B80245002CE72DF58691D5FE5F96C0739D57 125743~|~1~|~2~|~02/STR~|~Pavement GAL SR 790~|~05 - 4R Maintenance - Resurfacing~|~A94271D3C57C58A18B2B38D6F94AA05C06F38E80 114353~|~1~|~1~|~01/STR~|~Resurfacing various county roads.~|~05 - 4R Maintenance - Resurfacing~|~A2ECC2072386736582B7A5DBB5A0213215FAF8EF 107573~|~1~|~1~|~01/IMS~|~2020 Mowing Contract~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE498DFBCE7C1DB4431B8CAA1527D4D5ABA9B56F 119037~|~1~|~1~|~01/NFA~|~MOE-TR2214-0.06 Bridge Replacement~|~10 - Bridge Replacement~|~560E78AF317CF5BD1D8B3E14F380D6DFE848B097 106413~|~1~|~1~|~01/SAF~|~Install a modern roundabout at SR-132 and Chapel Rd.~|~~|~D4FB8D0A58178565537247F84A1BFECB67BEA6C8 122597~|~1~|~1~|~01/ERD~|~Reconstruct a 15-foot high (120 feet long) retaining wall that is failing along Sycamore Street.~|~66 - Resilience Improvement - Highway Project ~|~FF7302852E03DA228B3466D0259657C441B40AE4 99373~|~1~|~1~|~01/NHS~|~SFN 5700396, MOT-4-1006 on Opossum Creek & SFN 5700426, MOT-4-1046, on tributary of Opossum Creek - remove asphalt wering surface and water proofing. Place SDC non-composite wearing surface system with strip seal expansion joints. Patch abutments with Item 519 using (SCC) self consolidating concrete and seal with epoxy urethane.~|~13 - Bridge Rehabilitation~|~930B3EC402391E33C293FABE1B46BE2733322C35 120483~|~1~|~1~|~01/S>2~|~Bridge replacement~|~10 - Bridge Replacement~|~ADE7AA27CF6194EF3AC2E4A7664526BADD8471AB 120483~|~1~|~2~|~02/S>2~|~Add sidewalks on Elbee to connect to bridge~|~28 - Facilities for Pedestrians & Bicycles~|~314EF25D1B952DA403AEE211985B6FF18E3F2FC4 113132~|~1~|~1~|~01/IMS~|~Split for interstate PM work~|~05 - 4R Maintenance - Resurfacing~|~BDFFFBEC25A37650CA4E7F97FD772E2A403E905E 113132~|~1~|~2~|~02/S>2~|~Plan split for preventative pavement maintenance work on General system~|~05 - 4R Maintenance - Resurfacing~|~4D5FA03FF8847A4CAF1EE11758195755345CD6A2 100583~|~1~|~1~|~01/NFP~|~Landscaping project at D10 Headquarters Building. Non federal aid project funded 100% state.~|~31 - Landscaping & Other Scenic Beautification~|~7F500D7487826DED32FD5A2321D617F65FEED295 107782~|~1~|~1~|~01/S<2~|~Resurfacing HUR 250: 0.75-0.77 0.86-1.20 1.26-1.29 4.77-5.10~|~05 - 4R Maintenance - Resurfacing~|~6DD5597BDCD001D143EEC2B0A773E56C2E74D929 107782~|~1~|~2~|~02/S<2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D65BD3AC0FA81E048C3C72E7BE6554130543A47B 107782~|~1~|~4~|~04/S5K~|~Bridge maintenance / rehabilitation SFNs 3902250 and 3902048~|~13 - Bridge Rehabilitation~|~2CAC11BB2CA094CEF5B04814423ED986D16A32AF 107782~|~1~|~3~|~03/S5K~|~Pavement repairs and other 100% city items. ~|~05 - 4R Maintenance - Resurfacing~|~4D3F64F133B70723F9D87B2FF38DBFDACC26557F 107782~|~1~|~5~|~05/ENH~|~Curb ramps in Norwalk~|~28 - Facilities for Pedestrians & Bicycles~|~EC76561E5274502FE9A215EC3D95BE462AEAAD3A 96882~|~1~|~1~|~01/BRF~|~Bridge replacement--CEAO~|~10 - Bridge Replacement~|~1A0946C5E942A659F269CC2B2A73B0A2C32C1746 110219~|~1~|~1~|~01/NHS~|~PIK 23 (8.18) & Market St. Signal Upgrade~|~21 - Safety~|~A7DA8164BFE7DAB5B2EDE22A648902E83964CC89 99037~|~1~|~1~|~01/SAF~|~200 ft south of SR 571 (SLM 3.99) to 650 ft north of SR 571 (SLM 4.15) on Arcanum-Bears Mill Road (CR 34) - Realign Arcanum-Bears Mill Road approaches at SR 571 to reduce the intersection skew angle. This is to address safety concerns with pattern of angle crashes at the intersection.~|~21 - Safety~|~D6FD0EFA02AF62374F3C5FB53A02F801A5ED4B24 118730~|~1~|~1~|~01/BRO/SUCE~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~CEE107F81352864C7E947323A790DE0782847434 103395~|~1~|~1~|~01/STR~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~527D8D6F3514B0064DA2B5000DA50AAC9D31200F 121046~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9F196B548B2F78F6CB8AF3525F63DB194E27BC76 106965~|~1~|~1~|~01/NHS~|~LAW 52 0.00-11.58 sign maintenance.~|~44 - Other~|~22E1EE8FFFDC8A683336FDC29FB178452C44B9E0 90040~|~1~|~1~|~01/S<2~|~Urban Paving Program Milling of existing roadway and resurface with Asphalt Conrete in Celina from Portland Street SLM 11.46 to Main Street, US 127 SLM 12.23.~|~05 - 4R Maintenance - Resurfacing~|~4CCB35609390C9A539CEBA92330A0A31B796C468 83787~|~1~|~1~|~01/SAF~|~Pavement marking project at various locations for FY 2013. 100% state funded.~|~21 - Safety~|~FCC1051E6334E84AC2FD4DF5E41611623EB69A80 94037~|~1~|~1~|~01/NFA~|~ It is proposed to replace the culverts on Roads 4, 6, 13, 18, 19 & 23. Once inhabited by the Shawnee Indians, Shawnee State Forest came into existence in 1922 with the purchase of 5,000 acres of land which had been cut over for timber and ravaged by fire. During that same year, land acquisition was begun for the Theodore Roosevelt Game Preserve. Shawnee State Forest, also called "The Little Smokies of Ohio," has developed into the largest of the 20 state forests, with over 60,000 acres. Nearly 8,000 acres of the forest have been designated as wilderness. 100% state01/NFA/OT/state~|~44 - Other~|~6539F2A55BA35847510355EB7071508EA4FB876D 107551~|~1~|~1~|~01/STR~|~District crack sealing~|~05 - 4R Maintenance - Resurfacing~|~9C3C142C85CA6BEA7D3F4F8C110B7189EF1F77F2 90291~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing of State Route 48 within the City of Clayton .06 miles south of the southern corporation limit (SLM 19.04) to the Englewood South Corporation Limit (SLM 21.10)~|~05 - 4R Maintenance - Resurfacing~|~B026F6D0B865FD36EFE3B3BAC8DC6F4710734BC1 91769~|~1~|~1~|~01/IMS~|~Concrete deck overlaySFN, FRA-71-18.54, over I-670 & RR yards01/IMS/BR/~|~13 - Bridge Rehabilitation~|~E81CF3F483EEAFFCEEA09DDBF47F53CBFCA86C38 98557~|~1~|~1~|~01/SAF~|~Improve intersection of CR 3 at CR 22 and interchange of CR 3 and IR 70~|~21 - Safety~|~86A78114D788B5349D81E00510E0C67833B07FBE 98557~|~1~|~2~|~02/SAF/COC~|~Added plan split 2 for the MORPC funds~|~21 - Safety~|~87D07F585C97E804E46E8A69F1D5842BA47C0467 98557~|~1~|~3~|~03/SAF/COC~|~Added plan split 3 for 100% local items~|~21 - Safety~|~F61FB912A300298313830F6E7D66F9FB12B1EE8A 117923~|~1~|~1~|~01/NFP~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~C08F668F654C0409EB43934B030B5628689852E4 93852~|~1~|~2~|~02/STR~|~Resurfacing of SR 185 from .04 mile East of Catalpa Drive SLM 4.97 South and East to the intersection with State Route 47 SLM 5.45.~|~07 - 4R Maintenance - Relocation~|~B9E70C6ECC45D0F0659D374CE944E900040E3CA3 93852~|~1~|~1~|~01/STR~|~Relocation of State Route 185 from 0.04 mile East of Catalpa Drive (SLM 4.97) South and East to the intersection with State Route 47 (SLM 5.45). A distance of 0.25 mile. The existing State Route 185 btween SLM 4.97 and the overlap with State Route 47 (SLM 5.45) will be abandoned and/or vacated to the Village of Versailles.~|~07 - 4R Maintenance - Relocation~|~F4F4A52F4BDFD28895A22FC203A7759CAF9DD6C9 101826~|~1~|~1~|~01/NFA~|~The PORT is assisting Muskingum Cty and The Wilds to rebuild and repair two existing roads Zion Ridge Road and International Drive for traveling public and trucks~|~03 - Reconstruction - Added Capacity~|~87FB7A6817F38F7F330189DEE64647F1CF15264E 123778~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~85AB6E45E34E0B400898C60EEC233DF1A781EA7F 103191~|~1~|~1~|~01/S<2~|~Storm Sewer Replacement~|~44 - Other~|~093E7EFC8C86A4FAE065E11AD40B618C88547CE6 99502~|~1~|~1~|~01/S<2/HEAT~|~City of Heath Paving Funds - 4TA7 (80% Federal) / 4BG7 (20% Local) - (See CAP Comments) - Resurfacing of portions of Linnville Road (CR 311)~|~05 - 4R Maintenance - Resurfacing~|~538316CD786974FF628FBFB79E2EFF0A17394F08 122955~|~1~|~1~|~01/MPO~|~Plan split for the eligible rehabilitation work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0F8CD5F7E4D5ECDADF7DCB62EC96E6442E980013 99934~|~1~|~1~|~01/S<2/Zane~|~"01/S<2/PV/ZANE" - City of Zanesville resurfacing project utilizing 4TA7 funding~|~05 - 4R Maintenance - Resurfacing~|~1262703A5E1B190AA6485A60889BC01FEFFC5B54 117181~|~1~|~1~|~01/STR~|~Split for paving on the Rural STP system~|~05 - 4R Maintenance - Resurfacing~|~7187F352131740EB049CA281B984F64BCF02B457 117181~|~1~|~2~|~02/S5K~|~Split for resurfacing on the STP system~|~05 - 4R Maintenance - Resurfacing~|~DF59DB651062AA7D09A4C555309506B3220C1515 106270~|~1~|~2~|~02/S>2~|~City of Columbus urban paving plan split - 16.21-16.37.~|~05 - 4R Maintenance - Resurfacing~|~C1E813A05C25826AF5373C22BEE6C9E7A69CDEB8 106270~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FRA-317-16.37-18.52~|~05 - 4R Maintenance - Resurfacing~|~DF875D35AB72DD192862BC3724AF7311F2918F23 121294~|~1~|~1~|~01/S5K~|~All roundabout construction work included in this split.~|~04 - Reconstruction - No Added Capacity~|~4B4A31BDC2C3804726E061DA1724C8E8C626971D 80000~|~1~|~1~|~01/BRO~|~4805119 LUC SR184 8.32 Intersect: Ann Arbor R.R. 4805127 LUC SR184 8.4 Intersect: Norfolk Soutern/Stickney~|~13 - Bridge Rehabilitation~|~2BC44DF02DDEEE8356C405E8A1B0F19F1A208A33 107987~|~1~|~1~|~01/NFP~|~Various bridges.~|~21 - Safety~|~BAAC873C75F5C1EC9E7CDD79BD5DD5689657B341 103225~|~1~|~1~|~01/NFA~|~Replacement of a County Bridge.~|~10 - Bridge Replacement~|~F2F6DAA3FBA7D94F662F938152B1F761DFE2C914 119733~|~1~|~1~|~01/STR~|~Intersection Improvement project utilizing Oil & Shale Funds at 100%.~|~21 - Safety~|~DEA57D44847C055F7D0AC67125357A6CC2AADD65 122804~|~1~|~1~|~01/NFP~|~Parking lot improvements at Goodyear Heights Metro Park.~|~28 - Facilities for Pedestrians & Bicycles~|~8C6CCF21E3AFD74591FDE2561B95F61913F9E77C 116240~|~1~|~1~|~01/STR~|~Chipseal in SCI.~|~05 - 4R Maintenance - Resurfacing~|~299850223C80D74E09345BCB07FA33E2D217DF31 123123~|~1~|~1~|~01/BRF~|~Rehab SFN 2563126 that carries Ohio Center Way over CSX and Norfolk Southern rail lines.~|~13 - Bridge Rehabilitation~|~4741F26F5AE1A2A043E18EB1A81D7DD4A7E13CD5 123123~|~2~|~2~|~02/NFA/COL~|~Rehab SFNs 2563150, 2563177 and 2563207 that carry Ohio Center Way over CSX and Norfolk Southern rail lines.~|~13 - Bridge Rehabilitation~|~E53B4E7FAD1342B7B9F650F1FEB71DBB5D9CBC2D 82427~|~1~|~2~|~02/STR~|~District Allocation funded culvert replacement~|~44 - Other~|~35D1FEF39CD7B2115F07ACDB6454966A3BB720E8 82427~|~1~|~3~|~03/S<2~|~District Allocation 4PF7/4PS7 for cost above Geotech Funds cap~|~44 - Other~|~9E627DE8C591E0C9F4AC0F6B433E097C67A08762 82427~|~1~|~1~|~01/STR~|~Geotech (4SF7/4SS7) Funded Slope stabilization / capped @ $597,635~|~44 - Other~|~A06686B3DE70D90419A0E67E588BEEB5185B2BE7 126554~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~1766FBD3564BD8F0F9C14ACEB936853060B64C94 116007~|~1~|~1~|~01/NFP~|~Tree Cutting.~|~44 - Other~|~8404AF44E72DDF341C44729BB16A4840A90CF987 125476~|~1~|~1~|~01/MPO~|~Mason Montgomery Road and Socialville Fosters Road intersection safety improvements ~|~21 - Safety~|~C39AB5451373EC70C9E94180DB70352B63B70D7C 83015~|~1~|~1~|~01/S>2~|~Correction of embankment slide location at SUM-IR 480 at SR82.~|~44 - Other~|~D80B74C5E519F434C50D4679F0662D09AF25AA8E 95795~|~1~|~2~|~02/STR~|~Plan split for resurfacing SR-51 in Ottawa County from SLM 4.91 to 7.90~|~05 - 4R Maintenance - Resurfacing~|~D4C153F95936DF40BDA87154159F60CE1A7B9080 95795~|~1~|~1~|~01/S>2~|~Plan split for resurfacing of SR-51 in Ottawa County from SLM 7.90 to 10.39 and SR-51 in Wood County from SLM 0.00 to SLM 3.79~|~05 - 4R Maintenance - Resurfacing~|~B09A5FBFAADF3D32E75E7FCC46315221F95E8CF5 96010~|~1~|~1~|~01/NHS~|~SFN 4805224~|~~|~F57678B94EAC4CAD555FA8E302243D16F3C1BE07 89343~|~1~|~1~|~01/ENH~|~Begins at existing Hockhocking-Adena bikeway near town of Eclipse and continues 0.8 miles to Athens High School. Federal 80%/Local 20%. (TEA) Enhancement Program.~|~28 - Facilities for Pedestrians & Bicycles~|~D7D7BFF49429364F9098EBAF82AB61F6D99ED9D8 123726~|~1~|~1~|~01/STR~|~Plan split for resurfacing work on the general system~|~05 - 4R Maintenance - Resurfacing~|~DB0EB6B29462048697AAD6470ADAFF92DC394D6F 96780~|~1~|~1~|~01/IMS~|~Raised Pavement Markers~|~21 - Safety~|~6BD795CD3391C0419CE824DBC49C9168E81DD6C1 114665~|~1~|~1~|~01/NFP~|~FY27 RPM~|~21 - Safety~|~CEB431C0418A8D9F03B6CE7CF514933C87B6DE10 103748~|~1~|~1~|~01/BRO~|~SFN 4001206 JAC-93-15.48 over JAC-32-10.85~|~13 - Bridge Rehabilitation~|~F92E5AA49A713CA8A2862271E8DF494C667C3DFA 105135~|~1~|~1~|~01/STR~|~100% State funded Herbicidal spraying project, District-wide.~|~17 - Construction Engineering~|~5C0CD808AC9D148386665C5F8DC90FEF14CA91B9 107552~|~1~|~1~|~01/STR~|~Spot Paving~|~05 - 4R Maintenance - Resurfacing~|~BCA895FE18642D88C80695A8B7E695CD42601B2F 96104~|~1~|~1~|~01/NHS~|~Repair/Replace the lighting on US52 around the Ashland Bridge.~|~21 - Safety~|~A3CB7F90F199A5501E4C0C9A5BB5F8BD1BA42EE8 97581~|~1~|~1~|~01/IMS~|~Slide repair to SUM-IR 271-10.21.~|~~|~35C9D389260B74920C0B67DEF6A85B2FEFC9FA91 91923~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. Fund for 1 year Guardrail ding and dent repair~|~21 - Safety~|~89411DCA6C9A8B560D600D38495DE8F58E2B227F 100637~|~1~|~1~|~01/S>2~|~Plan split for the Urban portion of BUT SR 177 SLM 2.12 - 3.20~|~05 - 4R Maintenance - Resurfacing~|~2CB53CDD554F681BB88EBFB0CECE2130E334465D 100637~|~1~|~2~|~02/STR~|~Plan split for the Rural portion of BUT SR 177 SLM 3.20 - 8.48~|~05 - 4R Maintenance - Resurfacing~|~F7FEABF95578B34BEDEFCD41B0ECC1EACE827E3C 116498~|~1~|~1~|~01/S>2~|~Pave Invert~|~04 - Reconstruction - No Added Capacity~|~52B6D13A9F03D7A61C8392E7D514F1EF0A7D5E3B 116498~|~1~|~2~|~02/S<2~|~Pave Invert~|~04 - Reconstruction - No Added Capacity~|~4FD12462E6582481E6168CFC4FA7D8EB695856AA 116498~|~1~|~3~|~03/STR~|~Pave Invert~|~04 - Reconstruction - No Added Capacity~|~11792E1ED53A4813BAB1CCC7277E68D6F87DA07D 116498~|~1~|~4~|~04/IMS~|~Conduit work on Interstate~|~04 - Reconstruction - No Added Capacity~|~1FB19F9F179B0863947D9454324BCA1BC30CE80A 95716~|~1~|~2~|~02/NHS~|~Bridge plan split~|~47 - Bridge Preventive Maintenance~|~61CC7F4C4A156BDE748929D228CCCD4A9D8EBC8D 95716~|~1~|~3~|~03/NHS~|~LUC-24 from 11.53 to 12.62 (Safety)~|~05 - 4R Maintenance - Resurfacing~|~64F4FF4B353E955C139A4CB9E6BFD1AAF6A7BE54 95716~|~1~|~1~|~01/NHS~|~HEN-24 from SLM 0.00 to SLM 4.75~|~05 - 4R Maintenance - Resurfacing~|~863F188B64ADAB6EE1ACF1C37F25B294016F12BF 100886~|~1~|~1~|~01/STR~|~JAC 139 3.17 (SFN4002490)~|~04 - Reconstruction - No Added Capacity~|~55405D4C533AE2237097C8FA660B932229FF8D4B 93078~|~1~|~1~|~01/SAF~|~Center Road CR293 1.06-2.95~|~05 - 4R Maintenance - Resurfacing~|~617D4E194041569C6D4BBBDA1BE3CCD3F91D0B3B 125666~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~8F5370A39DD7A564C1A36D6AED346A7B008357B9 114738~|~1~|~2~|~02/S5K~|~Overlay on ROS 50. 80/20 Fed/Local~|~05 - 4R Maintenance - Resurfacing~|~BF506C08185C154BCED8B1CF5FA54B1D598F5BDA 114738~|~1~|~1~|~01/S5K~|~Overlay project.~|~05 - 4R Maintenance - Resurfacing~|~1F55C157EAE8359A83B7351C2221FEAF94A87CED 114738~|~1~|~3~|~03/S5K~|~100% local items.~|~05 - 4R Maintenance - Resurfacing~|~9D97D9B085E3B469AB8DDDFF88F6FD94E32EF9D6 105694~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 2 lane highways.~|~44 - Other~|~00C6DB67EDB382DCF459F589119E204388476989 117697~|~1~|~1~|~01/ERD/MAD~|~Reconstruction of Miami Avenue from Naomi Avenue to Euclid Avenue.~|~21 - Safety~|~7483696B34D0DD50A360063FB339D0615916C0BD 117697~|~1~|~2~|~02/SAF~|~modification of the grade crossing , including HAWKE signal and modification to the signal at Miami and Dawson Rd.~|~22 - Rail/Highway crossing~|~FBAFBBF71850E7D308FED7A8C23EC0633D229CD4 101698~|~1~|~1~|~01/S<2~|~STP 80/20 District Allocation/City of Bellevue~|~05 - 4R Maintenance - Resurfacing~|~419BBE427EA959CD3E653EA6D1710BA9301EB495 101698~|~1~|~2~|~02/S<2~|~STP 100% City of Bellevue~|~05 - 4R Maintenance - Resurfacing~|~635CE96734155E33123DE5646BFE56871F47C8FE 101698~|~1~|~3~|~03/S<2~|~STP District Allocation~|~05 - 4R Maintenance - Resurfacing~|~46D6B7E3C6367BB332AEF664BDA26E1EACCDA4B2 101698~|~1~|~4~|~04/S<2~|~STP Bridge: HUR-269-6.29~|~13 - Bridge Rehabilitation~|~D8DF7C55929489CE1FB13932E4EAFE7A233BDF42 109721~|~1~|~1~|~01/STR~|~All work in this project. Replacement of three culverts. Federal and state funds from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~6F72A7A7C026A511F18924C89B7D05C82C077828 104086~|~1~|~1~|~01/BRF~|~Bridge Replacement, Covert Road.~|~10 - Bridge Replacement~|~E16FA63D32BA2DA3862B7969022C11AC88FC7DF0 89246~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~11DD63D963ECF977AD117F643443F7F34BE0EF4F 119497~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes.~|~21 - Safety~|~067DB0DBC763A36444343D166A444654102D2752 119098~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~72242087E23EF6D7234D7FAEFB23F344D9A24A3B 109339~|~1~|~1~|~01/NFP~|~ODNR resurface day-use area at Mary Jane Thurston State Park~|~05 - 4R Maintenance - Resurfacing~|~5E8D511716C7DA4E13AC0C575212855F7283FA77 103428~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7~|~99 - State Preventative Maintenance~|~B6C1820A341AF2567BC670DC8C5C9E5B73C0F881 108934~|~1~|~1~|~01/S>2~|~FY2021 Urban Paving in the City of Beavercreek. This plan split is the 80% ODOT and 20% City items on the Urban Paving Portion of SR 835.~|~05 - 4R Maintenance - Resurfacing~|~4117644F934AC17193D4D191DA114855E8159BF0 108934~|~1~|~2~|~02/S>2~|~FY2021 Urban Paving in the City of Beavercreek on SR 835. This plan split is the 100% City items on the Urban Paving Portion on SR 835.~|~05 - 4R Maintenance - Resurfacing~|~AC8BFF131CD08260E1DCD66A992BBF67967A84F0 124775~|~1~|~1~|~01/SAE~|~100% CEAO HSIP (4HB7) funded safety items~|~21 - Safety~|~93E43BDFC99112533BFAEBA9C141675EA112D199 96957~|~1~|~1~|~01/STR/PIK~|~It is proposed to replace an entire structure on SR 772, 1.22 miles south of SR 32 in Pike Co.~|~10 - Bridge Replacement~|~9422F2C927256CACB92C881FC8E3BB95F3C4C785 93985~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn TR505, Comer School House Road, SLM 0.41, it is proposed to replace structure SFN 4033280.Credit Bridge applies: 95% Fed/5% local01/FNA/BR/Jackson~|~10 - Bridge Replacement~|~98AC8717814EE2F58ADA3B24530FF4E8B4543409 108654~|~1~|~1~|~01/NFP~|~The main facilities of the new Grand Republic Farm will be accessed off of US 6 by an 800? private drive. The main portion of that drive will be compacted stone with the apron at the highway being 9? reinforced concrete pavement~|~01 - New Construction~|~8247887EDDD2FA6702E1D0A34E1A52E5F6810448 126156~|~1~|~1~|~01/IMS~|~Block PID for bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~56D27558AE2C9CFF0CD8666B040DD03516DFF964 126611~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0E632ED828204EE453AAAB5CEB4DDA76FA30C6F5 93110~|~1~|~1~|~01/STR~|~STP Rural Pavement: HUR-4-6.68-8.38 / ERI-4-0.00-7.95~|~05 - 4R Maintenance - Resurfacing~|~EFD2773D9ACBD499B022123F1020414D3C41C109 93110~|~1~|~2~|~02/NHS~|~NHS Pavement: ERI-4-9.34-10.59~|~05 - 4R Maintenance - Resurfacing~|~CAFF2F8AB9142B5AD0977C6A51E403EB39A2EB69 93110~|~1~|~3~|~03/S<2~|~STP < 200000 Pavement: ERI-4-7.95-9.34~|~05 - 4R Maintenance - Resurfacing~|~ED2647267865394C15C2547CF6A6FCAD771C7A4D 93110~|~1~|~4~|~04/STR~|~STP Rural Bridge Work: SFN 2201259, SFN 2201291~|~13 - Bridge Rehabilitation~|~7AEB4690304E8F8D83547DA8766D2DE4809F1C3C 93110~|~1~|~5~|~05/NHS~|~NHS Bridge Work: SFN 2201356~|~13 - Bridge Rehabilitation~|~16487A3788D0360DD9D6431AD6161A23E53446FB 104849~|~1~|~1~|~01/SAF~|~Eliminate divided highway, reduce ramps to one lane, change ramp geometry at IR70/SR49 interchange.~|~21 - Safety~|~85A16FECDEC36125D39DC1040AEF340553178562 104849~|~1~|~2~|~02/NHS~|~Widening of the bridge to allow for turn lane development.~|~21 - Safety~|~EB7B20E32F6681A2AA6F48A18D1A2CDEA54C1B73 104849~|~1~|~3~|~03/NHS~|~Replace culvert.~|~04 - Reconstruction - No Added Capacity~|~96469914DA1D4D702B6ECE8067406F41A4C5F4A3 104849~|~1~|~4~|~04/NHS~|~Mill and Fill SR from Pleasant Plain Rd. to US 40~|~05 - 4R Maintenance - Resurfacing~|~1AC83895812DFEFB0BEFA2FDAF80F6E826E0B7EE 104849~|~1~|~5~|~05/NHS~|~On-going servioces~|~17 - Construction Engineering~|~47BE8B98CD41A5B0380587042C6ADF387E60D6F8 108684~|~1~|~1~|~01/SAF~|~Plans split for 100% safety funds~|~21 - Safety~|~6B162093BC2B90438733E1182186967D61E2BE54 110382~|~1~|~1~|~01/NHS~|~Bridge Repair from a Bridge Hit.~|~44 - Other~|~1DE868D929B943EAA989F1FC53E35ED4C6194EC5 106341~|~1~|~1~|~01/BRF~|~All costs to replace the bridge. Federal funds from the Ohio Bridge Partnership Program. Toll Revenue Credit is being used for the match~|~10 - Bridge Replacement~|~A9A7BE428F2AE34A770F3B9D5A3E00680EDA4EF8 106341~|~1~|~2~|~02/NFP~|~Items paid 100% by the City of Van Wert. The 100% City items are resurfacing, curb replacement, and underdrains from Station 11+00 north to the intersection with Central Avenue.~|~44 - Other~|~CF364EFC59015DF2A65028449F347CE72C2138B2 95226~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip-seal treatment. Rural Federal Aid route, funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~9F570CB644DE24DBCF347DBE73FDE6690E4321D7 95226~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip-seal treatment. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~6FD8169C5E8869EA0103281E88C5D4DA3C01636A 100967~|~1~|~1~|~01/IMS~|~Overlay IR 675 in Montgomery County: MOT IR 675 SLM 4.11 to 7.44~|~05 - 4R Maintenance - Resurfacing~|~9F7DEF4250F76D2104BE57DC19AA6E198D1A6297 100967~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~538BE3F9CC3F72676BDF028FCB1C0B624E536A97 112620~|~1~|~1~|~01/MPO~|~Resurfacing of Center St from Lowellville Rd to Clingan Rd in the City of Struthers.~|~~|~7FA958E2D7F205528A27DE9FFD7C5F0E8AD51D95 126449~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~D36ACA2D7CA8EB7E80CEDF38BF9BAED9BE108F76 116179~|~1~|~1~|~01/BRO~|~Bridge rehabilitation (superstructure replacement) utilizing 80% 4C87/20% LNTP.~|~13 - Bridge Rehabilitation~|~FEEE45C4D1028B6F383B9A12909FFC5A0157674E 87974~|~1~|~1~|~01/SAF~|~Upgrade existing signing along SR 129 in Butler County from 16.29 to 25.86 logpoints.~|~~|~CBBFC4D652F78C81A12F08DCBEB3FACA6307C492 106129~|~1~|~1~|~01/MPO~|~Conversion of the existing five legged intersection of Tylersville Road with Hamilton-Mason Road, Hancock Avenue, Grand Boulevard, and Tuley Road to a modern roundabout.~|~21 - Safety~|~541E409EC11AE19EE971F176FABE57D5E7F6A872 106129~|~1~|~2~|~02/MPO~|~Plan split for construction of pedestrian facilities in association with construction of the roundabout.~|~21 - Safety~|~E8B6354B66EA8FBF635B6CF9CB935FAA7AFD81EA 105998~|~1~|~1~|~01/NHS~|~Plan split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~65347F5BCAAD6E05CF4EBC64D66B2AB8883E6E85 106625~|~1~|~1~|~01/NFP~|~Resurfacing of Nimisila parking lots part of the Summit MetroPark district.~|~44 - Other~|~726C46794CC2E678941514882255B10C08317F0C 94189~|~1~|~2~|~02/STR~|~Resurface and perform pavement repair on the RURAL portion of SR 133 in Clermont County between SLM 22.25 to 28.0~|~05 - 4R Maintenance - Resurfacing~|~4C3412020B9883D23F41DB4CEFD2DCB8B0CD8AD7 94189~|~1~|~1~|~01/S>2~|~Plan Split for the Urban section on CLE-133 between SLM 20.28-22.25~|~05 - 4R Maintenance - Resurfacing~|~9776E005C8D74390C16C25ECA7E260DA01D775C2 94189~|~1~|~3~|~03/NHS~|~Plan Split for minor bridge patching.~|~17 - Construction Engineering~|~9F0FBDB0D09D0783FF8579B82D51C2C6CDE4FA78 93340~|~1~|~3~|~03/S<2~|~A noise wall project at HEN US6 11.06-11.30~|~01 - New Construction~|~5DDCEE2AB4199C0458D435C2EA1383AA66F80092 93340~|~1~|~1~|~01/NHS~|~A project to build a noisewall at HEN US6 11.32-11.83~|~01 - New Construction~|~A4E99F9FCD6B4631A6AA0754F06F55999516638F 93340~|~1~|~2~|~02/STR~|~A noise wall project at HEN US6 11.30-11.32~|~01 - New Construction~|~D8B914CDDB8EEF756582CB55C4BDBB877622F728 114941~|~1~|~1~|~01/IMS~|~Replace expansion joints.~|~17 - Construction Engineering~|~84EE22A9406D53990BC8F74F99762C5346CAA3AB 114941~|~1~|~2~|~02/NHS~|~Replace expansion joints.~|~17 - Construction Engineering~|~FE85D1149DF6A6615B93679E0EC9BDB1CCC58E0F 114941~|~1~|~3~|~03/STR~|~Replace expansion joints.~|~13 - Bridge Rehabilitation~|~4CD75EB61D58AA7496E1DF6040BBA0AA714DB54B 120794~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~864DB705C7355C7C7FD0FC174D11B4229CC8EF4A 105979~|~1~|~1~|~01/SAE~|~Plan Split~|~21 - Safety~|~94E39AC1714B6239BCEE5FDA4F316D69A65B62A2 100255~|~1~|~1~|~01/MPO~|~Rehabilitate Elm Street using MPO STP funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B25D62A8546439BA24999DD2D40CFB23CDAD139 105100~|~1~|~1~|~01/S<2~|~SCI 239 0.97 SFN 7304714~|~13 - Bridge Rehabilitation~|~0576E2165B9A37E4A322A44B1972D2E49FD50985 95941~|~1~|~1~|~01/NFA~|~Columbus Airport Authority~|~44 - Other~|~ED235F31DC59BAC0E1783388F214D9038A4E2A0A 116334~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing on HAM-127~|~05 - 4R Maintenance - Resurfacing~|~16FE37D74A66D1A89435F117CCFA6C41C61B6063 86272~|~1~|~1~|~01/NHS/AMH~|~Resurfacing80/20 Fed/City~|~05 - 4R Maintenance - Resurfacing~|~67A0061EBBEC4AAB1E04FF1B25F5DA51716C32B7 86272~|~1~|~2~|~02/NHS/AMH~|~Resurfacing100% City of Amherst~|~05 - 4R Maintenance - Resurfacing~|~7CF5C25AB1F91FD01ED11DA956B56B8876708AC6 105643~|~1~|~1~|~01/IMS~|~Longitudinal joints and minor repairs on Interstate Route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AFD671384421DABB5AD250A8FAE9F61638B64590 116602~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items on FRA-71.~|~05 - 4R Maintenance - Resurfacing~|~3D63CC671FBE3148BB252109AA9D47033504B23A 112333~|~1~|~1~|~01/NFP~|~Highway Lighting maintenance~|~21 - Safety~|~64AFA72036512639577BDAD62ABEA33B5AE2A177 124863~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~8467BF7B0F2AA8D4C665148B8CC2CF133AFBC41E 87114~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. NOB 565 0.00-2.88. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~AC9F4C271010E7ACCC09A4745907EF88627E9BC1 87114~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. MRG 669 5.62-11.92 and NOB 146 0.00-8.15. Not on any federal aid system. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~3256813EA756BFAEB6D0727409CBA86E8248594B 104762~|~1~|~2~|~02/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. Urban paving on WAS 7 24.32-24.83, 24.83-24.98 SB ONLY, 25.15-25.19. Funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~D7FCEEA8136B64CCE4AF950D93C14955619EFDB9 104762~|~1~|~3~|~03/NHS~|~City of Marietta to pay for curb ramps. 100% Local. ~|~05 - 4R Maintenance - Resurfacing~|~E0EED5DB6F2D1F7EC3D4012D47539E8B0D5B7AB3 104762~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. WAS 7 24.83-24.98 NB Only, 24.98-25.15, 25.19-31.59. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~56858732032DEA77292B79103FC7CD206328EBE1 104762~|~1~|~4~|~04/NFP~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~2465E3DC434194BA318C364878BEE5104698B78F 102692~|~1~|~2~|~02/S>2~|~Improvements along SR 303 in the City of Hudson.~|~~|~C672D8F96BB572D66FDD33F0D12A92C4B1B73E57 102692~|~1~|~1~|~01/MPO/HUDS~|~Improvements at the SR 91 and SR 303 intersection in the City of Hudson.~|~~|~872AC207A4D5CB3BFD0FBE4A4A021C1E13136A08 122818~|~1~|~1~|~01/STR~|~Plan Split for MVPO STBG funded scope.~|~05 - 4R Maintenance - Resurfacing~|~70EAEE9FFAE41BBCED6C43816D092B8A64CBAECF 84754~|~1~|~1~|~01/IMS~|~SFN 5003253 SR164 OVER MAH-IR680 14.37.~|~13 - Bridge Rehabilitation~|~84921E364DBBA2A795A70F2DE8E6CB9C7FA5B7FD 84754~|~1~|~2~|~02/IMS~|~Resurfacing of Interstate IR680 from US-224 to the Ohio Turnpike, Mahoning County, Ohio and includes right turn lane on Western Reserve Road.~|~05 - 4R Maintenance - Resurfacing~|~C3240E2A3EC21BDD3DBAB364CC8AB970CD8AA33D 84754~|~1~|~4~|~04/IMS~|~Pavement Markings.~|~21 - Safety~|~C8F23C3A062BA9CD7F8212254C53D30CC8300395 84754~|~1~|~3~|~03/IMS~|~Bridge rehab of sfn#5007879, sfn#5007860, sfn#5007828.~|~13 - Bridge Rehabilitation~|~FC54CFE31FCCFD242296AC221470CF545EC77B77 115823~|~1~|~1~|~01/BRO~|~Split for bridge replacement work~|~10 - Bridge Replacement~|~336C43B50F0FC072046D8337EF66F43FAD9C989C 121117~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~73D7BD4FF75204F18DB2F9F6D210E5DE25EC236B 121512~|~1~|~1~|~01/BRO~|~MAD CR 71 4.14 over a Tributary of Deer Creek~|~10 - Bridge Replacement~|~EC78FEA4EB6A0C5415BB4FEAAD086614E70ED079 110342~|~1~|~1~|~01/BRF~|~Bridge replacement plan split~|~10 - Bridge Replacement~|~693A56D09B4A54B0BDA8415778FE1C10749DD699 121962~|~1~|~1~|~01/S50~|~All work to construct roundabout included in this split. 100% federally safety funded.~|~21 - Safety~|~7253325B0A84EA52740262AAA17DD9954BCB3FC3 84769~|~1~|~1~|~01/S>2~|~The project will consist of reconstruction of State Street, including pavement removal and replacement, drainage improvements, access management per City ordinance, replacement and addition of sidewalks, and a bikeway. and a new traffic signal will be added at Campbell Road.~|~04 - Reconstruction - No Added Capacity~|~D04DDC03518CCD01AE1325A3870FFA2A5F714F27 84769~|~1~|~2~|~02/S>2~|~For Indiana portion of the project.~|~04 - Reconstruction - No Added Capacity~|~8407C5634DA0F88FF894155BEA7F94D9BB9F545D 84769~|~1~|~3~|~03/S>2~|~Plan split covers 100% local funded fence costs that are not eligible on this project.~|~04 - Reconstruction - No Added Capacity~|~ADE6B2701FC961C95A1FEBC44E7C0E2F04CDA81E 123096~|~1~|~1~|~01/SAE~|~Median cable barrier~|~21 - Safety~|~B1D5FE0406E81F0CA48DD43AF37400DB4B59BEB5 117227~|~1~|~1~|~01/MPO~|~Primary plan split for STBG eligible items.~|~05 - 4R Maintenance - Resurfacing~|~C15DCC58B977B5C5B8B30E866FCCC3C6C6924C52 117227~|~1~|~2~|~02/NFA~|~Locally funded scope~|~44 - Other~|~53117F5069EAE354D01C64155B883D777870C2CA 102397~|~1~|~1~|~01/NFA~|~Resurfacing project using an asphalt overlay treatment. MRG 555 3.85-15.22. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~C04D44126560841D285DC7CB382A4FD056C252A3 102397~|~1~|~2~|~02/NFP~|~Resurfacing of the Morgan County Full Service Maintenance Facility parking lot. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~30925579E60101B376E44AA0226FED02E8179DC1 101182~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~17 - Construction Engineering~|~1A74831C267BADBD197A7A924C5329932A1BC26C 101182~|~1~|~2~|~02/NFA~|~Asphalt overlay~|~05 - 4R Maintenance - Resurfacing~|~30A6934920FE07F25BCD451A1C82399F4A1DB7E1 93651~|~1~|~1~|~01/NHS~|~Work on the National Highway System (NHS). All work on US 224 and SR 12 is in this split. All work is in the City of Findlay. Federal funds from the District Preservation Program budget. The 20% non-federal match is provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~1572787C2630D865664E648001866CAF5E92B1F8 93651~|~1~|~3~|~03/NFP/FIND~|~100% City items paid by the City of Findlay. Curb ramps, fill and partial depth repair and aux. pavement markings in the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~7D88F47C46D84228BC4EED1D26E3C78554B61602 93651~|~1~|~2~|~02/S<2~|~All work on SR 37 and SR 568 is in this split. All work is in the City of Findlay. Federal STP funds from the District Preservation Program budget. The 20% non-federal match is provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~F2C324F2D8C1E85D4B44D34F983F4881F8F36FAF 97593~|~1~|~1~|~01/NHS~|~Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) Program with the amount over the GSM cap from the District Preservation Program budget. The GSM funds are to be used first.~|~44 - Other~|~0BD4B98C2102E37A9DFB32E205F7427F17EC38FB 94270~|~1~|~1~|~01/ENH/FRED~|~"01/ENH/OT/FRED" - Enhancement Funding 4B37 (80% Federal Cap $435,271) / LNTP (20% Local) Village of Fredericktown Enhancement project for construction bike/ped facility from Stockman Park to Dana Park. Project~|~28 - Facilities for Pedestrians & Bicycles~|~69902C8BBA4027EA6385BF218F8CCC79EBED4CD9 98840~|~1~|~1~|~01/MPO~|~Replace SFN 5052254 Lowellville Road bridge over Hines Run.~|~10 - Bridge Replacement~|~6B5E356C89C9C7AF0F9CB9840AD26B5BB5E4DB22 119148~|~1~|~1~|~01/SAF~|~Plan split for CEAO HSIP eligible intersection realignment and improvements.~|~21 - Safety~|~12306AAE2516F6528EDF699D27A91F6CAAFCAC00 126423~|~1~|~2~|~02/S>2~|~Asphalt Concrete Overlay with RepairsMED-94-21.421 to 21.491~|~05 - 4R Maintenance - Resurfacing~|~7585B1D6CC9BDBEEF5E5D77CFF25DB6D4B68E192 126423~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with RepairsMED-94-18.671 to 21.421~|~05 - 4R Maintenance - Resurfacing~|~CE6161A6C85D7428903F1E2AF087DE2E785F80FF 119725~|~1~|~1~|~01/BRO~|~Plan Split for Municipal Bridge Program funds.~|~10 - Bridge Replacement~|~56B0D10411DCABC2FE803371EE024D165DD1EDDA 97636~|~1~|~1~|~01/STR~|~Tree clearing and removal for Phase 1 of the Portsmouth Bypass. SCI SR 823 6.81 to 10.27~|~01 - New Construction~|~3FFD8B8DE08BFFFA84ED3F8C403D41A325B24A77 81821~|~1~|~2~|~02/NFP/fost~|~This is for the water works.~|~03 - Reconstruction - Added Capacity~|~02B63A1A9E05287D39A84CFF46CA9DD74B70B0EA 81821~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to reconstruct and widen WOO TR31 8.23-8.71~|~03 - Reconstruction - Added Capacity~|~C63107EBD0A59DE73892D2FFB2230B64C2465D3D 113099~|~1~|~1~|~01/NHS~|~Bridge Repair plan split~|~13 - Bridge Rehabilitation~|~5E95EFD397734BDA0FAA89BAB348BB859C8BFCAD 118785~|~1~|~1~|~01/NHS~|~Fine Graded Polymer Modified Asphalt Concrete Overlay (Smoothseal)MED-224-16.054Asphalt Concrete Overlay with RepairsMED-224-15.586 to 16.054~|~05 - 4R Maintenance - Resurfacing~|~71DC1D91BE10D4D0E99F17F1585C79B1BBA93629 118785~|~1~|~2~|~02/IMS~|~Fine Graded Polymer Asphalt Concrete Overlay (Smoothseal)MED-76-1.108 to 7.727~|~05 - 4R Maintenance - Resurfacing~|~F0FFFC5A911D90E1AEE3230883333C3A5C139F78 123885~|~1~|~1~|~01/STR~|~Plan split for deck replacement on STP Rural~|~13 - Bridge Rehabilitation~|~4D861EA3D69FAD7C5593BE3F0510407E5E181A6D 108836~|~1~|~1~|~01/BRO~|~Rehabilitation of Bridge No. GRE COLUM 0020 (SFN: 2960370).~|~13 - Bridge Rehabilitation~|~3F935F5C4F641379A74A3731A49A906088C71296 84654~|~1~|~2~|~02/NHS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~5852F7A5A661E3791268649B437C416F29B2F5CA 84654~|~2~|~3~|~03/IMS~|~Construction of noise wall along Blake Avenue in the IR-77 right of way.~|~44 - Other~|~0CAECC1798B4E1710E898377AED6E8FCA5EF587D 84654~|~1~|~1~|~01/NHS~|~Resurfacing STA US 62 from 22.60 to 24.90.~|~05 - 4R Maintenance - Resurfacing~|~47B0AE98F34FBB902BABEFC9FBD9A8F3E42C0A02 84654~|~1~|~4~|~04/IMS~|~Repair and replace noise wall panels along IR 77 at 38th St and Orchard Park St.~|~44 - Other~|~BA221EAF25161A46392150E44BBA1708276AAFE6 84654~|~1~|~5~|~05/S>2~|~Minor bridge work to linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~DC18FD806713D6E88DADF5AED8724686C6609B5D 84654~|~1~|~6~|~06/S<2~|~Minor bridge work to linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~B4577235FF181DDFBD44847DAEB1AE3708C48C0B 97547~|~1~|~1~|~01/STR~|~Ohio Bridge Partnership Program 1 Bridge Replacement~|~10 - Bridge Replacement~|~AE03255E1BC09C705162EA1694B098021771EF8C 120158~|~1~|~1~|~01/SAF~|~Plan Split for Safe Routes to School funding~|~28 - Facilities for Pedestrians & Bicycles~|~ECA79F9650B2D9258196E7B0178E45103C6FD7D4 101021~|~1~|~1~|~01/SAF~|~District wide highway lighting maintenance in D8.~|~21 - Safety~|~396DFDB54829DDC457B0FCDA47415CA247847B85 101021~|~1~|~2~|~02/SAF~|~District wide highway lighting maintenance in D7.~|~21 - Safety~|~AC9B210E79A01C389D58A31AE680839A87875FCB 101021~|~1~|~3~|~03/SAF~|~ITS Maintenance~|~21 - Safety~|~67F08D487807D20860CC12432949374B5617A3A4 86929~|~1~|~1~|~01/STR~|~SFN 7201079 SAN US6 30.26 Intersect: Little Pickerel Creek SFN 7202199 SAN SR53 1.69 Intersect: Wolf Creek~|~13 - Bridge Rehabilitation~|~330C619E95FCA6519C7CE7859A2BDFCBD2017503 103700~|~1~|~1~|~01/SAF~|~Work eligible for SRTS funding~|~28 - Facilities for Pedestrians & Bicycles~|~667C34C2004604DE95F75289164E36963F3C136D 119850~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Cassady Ave~|~28 - Facilities for Pedestrians & Bicycles~|~EB36E57DF6FC64B263EF603E58D5CC59A0C33B25 92220~|~1~|~1~|~01/IMS~|~100% state funded plan split for all work using state district allocation funds.~|~47 - Bridge Preventive Maintenance~|~5797FBC7D23153D2793673F1A1E22588F7077FE4 99894~|~1~|~1~|~01/MPO~|~Resurfacing of S Main Street from Knoll Street to Rose Lane Street~|~05 - 4R Maintenance - Resurfacing~|~A6499F8BECC8ACCB5301E0A90F53A9BE164004FD 88513~|~1~|~1~|~01/NHS~|~Resurface SEN US224 29.58-32.14~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~01556014476806288D503098A31318C1C71D03CA 102966~|~1~|~1~|~01/NFA~|~Smooth seal on Non-Federal Aid route: LOG SR 274 SLM 11.00 to 12.28.~|~05 - 4R Maintenance - Resurfacing~|~0C93A1E0F8CCCC6F87CB499D30D8B9327F63CA85 102966~|~1~|~2~|~02/STR~|~Smooth seal on rural routes: LOG SR 245 SLM 5.12 to 5.84 & LOG SR 292 SLM 0.00 to 1.13.~|~05 - 4R Maintenance - Resurfacing~|~D191BB3EE9261DAB5C96F7ACB27170A576A50BD3 118766~|~1~|~1~|~01/IMS~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~331EEAA13A80C216F21C272DB0B85E8266302850 114367~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ "~|~05 - 4R Maintenance - Resurfacing~|~C21264333FBA796A7605B8FA3A18079DC2D75E2D 95163~|~1~|~1~|~01/STR~|~Field pave the existing 72" CMP on State Route 29. SHE 29 23.99. Field pave the existing 84" x 66" CMP on MER SR 274 3.24~|~44 - Other~|~48494690835310BE8D8E4E9669234DACD2FEA4FE 119971~|~1~|~1~|~01/MPO/FRA~|~MVRPC STBG funded resurfacing project in the City of Franklin with a 31% local match.~|~05 - 4R Maintenance - Resurfacing~|~A7C74A8E9E92E830C99C4C978971E7C95A5A876F 87526~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~5FB93B7175947253A8901375DDBDAA4C68D1587B 90873~|~1~|~1~|~01/ENH~|~Install sidewalks, crosswalks, pavement markings, and advanced warning signing on State Route 501 on Liberty Avenue, Independence Drive, and Murray Road. on State Route 198 installation of crosswalks and advance warning signing.~|~21 - Safety~|~C20BE53A4EB2067A9010739AF9F13EE08C94A566 126384~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~269F009B7CADBDB6668D0FEA736DD75B321B96B0 91168~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on CHP US 68 from SLM 5.65 to 6.37 (segment length 0.720 total lane miles 1.440) Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~E7D752103CCFB614C22999E04ABD9C4C2C10236A 106418~|~1~|~1~|~01/SAF~|~GR Upgrades~|~21 - Safety~|~0D7324124B3D94A66A5A6369EECDFD9C9EAC85FE 123631~|~1~|~1~|~01/STR~|~Funding Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~1E15AF96901E2A6CD67ACA2DB43BDF574330BF0A 86692~|~1~|~1~|~01/STR~|~Smoothseal - RuralHUR-060-02.07 to 15.96 / ERI-060-00.00 to 08.09~|~05 - 4R Maintenance - Resurfacing~|~1695B0635CC129E8E813432F16DD6739A4537B36 86692~|~1~|~2~|~02/S<2~|~Smoothseal - UrbanizedERI-060-08.09 to 08.98~|~05 - 4R Maintenance - Resurfacing~|~772E0EADBECA7BB8E0E6643EBE37CA24B1A10C11 116930~|~1~|~1~|~01/IMS~|~Bridge Patching & substructure repairs - Interstate~|~~|~B4ACFFF909D5E5C2CE2BED978FEC531D67E87546 116930~|~1~|~2~|~02/NHS~|~Patching & substructure repairs - NHS~|~~|~DC40714FCD4F647F8F076FBF59393788C62F6B73 116930~|~1~|~3~|~03/S5K~|~Patching & substructure repairs - Other Fed Aid~|~~|~97B238CD548379EBAC4B82B10427AFEB03FF8DFC 92121~|~1~|~1~|~01/S>2~|~80/20 funding split using federal MPO STP funds~|~05 - 4R Maintenance - Resurfacing~|~601A2169EC0EDEA97CAF269B7FFF9F7CF1656C62 92121~|~1~|~2~|~02/MPO~|~80% federal / 20% local funding split using MPO enhancement funds for enhancement eligible work items such as curb bump-outs, raised crosswalks, crosswalk signal head and curblane for storm water run-off.~|~44 - Other~|~B42CE39D0707A152A97570866B779BD6851826ED 88670~|~1~|~1~|~01/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~6E059B41A565383BCA2DA488406FBE139540FB8E 88670~|~1~|~3~|~03/S<2/WSTR~|~100% City of Wooster~|~05 - 4R Maintenance - Resurfacing~|~915BC66D33944E5B704E171442DAF30678A92CDA 88670~|~1~|~2~|~02/S<2/WSTR~|~Urban Paving - 80/20 - District Allocation/City of Wooster~|~05 - 4R Maintenance - Resurfacing~|~A0C9265025BA6EEE609B3421DFA6440CFFF44B8C 125815~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~F44478B99E91355374465FAC62BDB46E8768CF6F 84199~|~1~|~2~|~02/S<2~|~Maintenance contract for sign replacement, FY 2013. Other Federal Aid 80/20%. GAL 141 21.55-22.15, GAL 160 0.00-0.53 and GAL 588 10.87-11.74.~|~21 - Safety~|~19AA13576C2E2B27E746933A4084A4655233B4B4 84199~|~1~|~1~|~01/NHS~|~Maintenance contract for sign replacement, FY 2013. NHS ATH 50 32.00-32.02 and GAL 7 21.21-26.06. Federal/State 80/20%.~|~21 - Safety~|~D3D0C10EF99D20A5E85EEF404B15DF4AC4AB5C5F 126954~|~1~|~1~|~01/NFA~|~Major funded project work on CLE-774 ~|~04 - Reconstruction - No Added Capacity~|~8040F95B66B0284308C2DE8556A230CE9A1C4292 120979~|~1~|~1~|~01/S>2~|~Sidewalk repacement.~|~28 - Facilities for Pedestrians & Bicycles~|~A3EC5B7DBF0A7338E9E070F1943040A2AC5A0377 120165~|~1~|~1~|~01/SAF~|~Construct a shared use path within the City of Lebanon along N Broadway St (SR-48) from the existing path near the fire station to Miller Rd (TR-101).~|~28 - Facilities for Pedestrians & Bicycles~|~9C742E1C4569B3D2B37A9DAFF2D88D84EB2C4B72 120165~|~1~|~2~|~02/NFP~|~Plan split for the watermain replacement, funded 100% locally.~|~43 - Utilities~|~508751E407E5ED2CD7FE8D58D5F3C96050C83493 120165~|~2~|~3~|~03/S>2~|~FY 25 Urban Paving project in the City of Lebanon on US 42, SR 48, and SR 123.~|~05 - 4R Maintenance - Resurfacing~|~0C3EA8E6EC403B5CA123943E883472FF7276B7B4 120165~|~2~|~4~|~04/S>2~|~full depth repair and urban paving items not covered by UP funds~|~05 - 4R Maintenance - Resurfacing~|~397962DC08D9268C2C45D69B185D1A1075B2DF31 120165~|~2~|~5~|~05/S>2~|~Full depth repair outside the city of Lebanon, 100% ODOT responsibility.~|~05 - 4R Maintenance - Resurfacing~|~2866A24BD45D1EE853E3351011B3D4B06103864B 95724~|~1~|~1~|~01/STR~|~FUL-2 from SLM 2.85 to 4.86 and SLM 9.39 to 12.294~|~05 - 4R Maintenance - Resurfacing~|~4E6E0D395EAF8C123DE700E734346999849E695D 95724~|~1~|~2~|~02/S5K~|~FUL-2 from SLM 12.294 to 13.50~|~05 - 4R Maintenance - Resurfacing~|~C743030B8BC32C4DE05358318CCFB18933C07A9D 95724~|~2~|~3~|~03/S5K~|~Plan Split for eligible Urban Paving scope items. FUL-2 from 13.506 to 14.133.~|~05 - 4R Maintenance - Resurfacing~|~5E889670E0B30665C184FEA9857E505ADA914F34 95724~|~2~|~4~|~04/S5K~|~Plan Split for 100% locally funded items within Urban Paving scope. FUL-2 from 13.506 to 14.133.~|~05 - 4R Maintenance - Resurfacing~|~D21113F4759BA2C42E616251822DBFCF66CEA3EC 115443~|~1~|~1~|~01/STR~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~FA3780544F0E10FAF5C7C756D27B4BF15844217F 117343~|~1~|~1~|~01/BRF~|~Bridge demolition. All work in this plan split. ~|~44 - Other~|~2CD80ADA89BA4959EEA1D737C025CC98C56AFC7C 98672~|~1~|~1~|~01/NFA~|~CR 171 2.75/4.20 Widen pavement, spot shoulder improvements, resurface, improve intersection radii. 1/4 mile south SR 119 (start)/0.2 mile north of Amsterdam Rd. (end).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5B2B8762B1C13244EFB513B342644BB9CF53BCB6 115840~|~1~|~1~|~01/SAF~|~All work to construct the grade separation.~|~08 - Bridge - New Construction~|~6C4FB3920478D8F75E696BD99DF657428C3C35E6 111514~|~1~|~1~|~01/NFP~|~Landscaping maintenance at various interchanges in Franklin County~|~31 - Landscaping & Other Scenic Beautification~|~3D6CFE925BE2BD42D0774B7DA8473A31EDE1878D 87589~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1)Fai-SR 204-06.93 to 11.16; 2) Lic-SR 146-00.00 to 02.34; 3) Lic- SR 310-10.33 to 13.45; 4) Lic-SR 586-00.00 to 11.35; 5) Lic-US 40-19.61 to 29.38; 6) Lic-US 40-29.39 to 30.14; 7) Mus-SR 60-00.00 to 08.03; 8) Mus-SR 146-00.00 to 01.97; 9) Mus-SR 146-17.55 to 33.76; 10) Mus-SR 345-00.00 to 01.60; 11) Mus-SR 586-00.00 to 04.63; 12) Mus-US 40-00.00 to 01.08; 13) Mus-US 40-01.08 to 05.10; 14) Per-US 22-06.77 to 14.27; 15) Per-SR 345-00.48 to 09.22;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E3B1C0D79EC59F80C821B9F5603EF5EC1D0F425 87589~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Fai-SR 204-00.36 to 06.93; 2) Mus-SR 146-16.21 to 17.55; 3) Mus SR 345-01.60 to 02.52; 4)Mus-US 40-05.10 to 09.59;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A01389D592D7AEBD9A812EA0ED253ED1B16948CB 87589~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Cracksealing on Per-SR 383-00.00 to 01.50~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BAEA24F5EFAC67F842B071808816ACE9757AB863 87589~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Lic-SR 13-13.98 to 22.55; 2) Lic-SR 16-07.22 to 14.24; 3) Mus SR 16-06.41 to 11.70; 4)Mus-US 40-09.59 to 10.37;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EB05F1DFD94517BB295B53A06D6510D78BE32833 123665~|~1~|~1~|~01/STR~|~Superstructure Replacement.~|~13 - Bridge Rehabilitation~|~379C211D522AC1C13C2CE15AAD9B41E2DFFFB17C 104615~|~1~|~1~|~01/S<2~|~Safety Improvement & Traffic Calming on SR 47 in The City of Sidney.~|~21 - Safety~|~608CF016836EE0F7FC178815A5D9E616A98337E8 104615~|~1~|~2~|~02/S<2~|~Image enhancement on areas of SR 47 in the City of Sidney.~|~44 - Other~|~D4D0180D0E72276B881CDC958E45DBBF7EDCADDC 104615~|~1~|~3~|~03/SAF~|~Safety improvements.~|~21 - Safety~|~EA3025DEC2BF2E57BB2ECCC804C1A0DAEC1FF45A 96626~|~1~|~2~|~02/NHS~|~Culvert replacement project. GAL 35 0.95 and GAL 7 20.39. NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~CB769673F51DD807D055CFE4C620C1A03B83CCCA 96626~|~1~|~1~|~01/STR~|~Culvert replacement project. ATH 13 1.01; ATH 681 9.55; GAL 218 4.52; GAL 233 4.30; GAL 553 0.10, 0.58; HOC 56 11.93; MEG 124 64.23; MEG 248 2.64, 4.45; MEG 681 3.80; MEG 684 3.72; MRG 329 3.49; VIN 327 3.25, 7.52. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~CAC7BD29CA10844A2038BB5DC63994334DE1AEDE 121696~|~1~|~1~|~01/SAF~|~Radar detectors.~|~21 - Safety~|~BA59A77B885E01EFEDFA3426ED93756D91F9A598 98907~|~1~|~1~|~01/IMS~|~Remove and replace structures providing added capacity and construct MSE walls. CLA IR 70 11.01 - SFN 1204203 L - SFN 1204238 R CLA IR 70 13.26 - SFN 1204386 L - SFN 1204416 R 13.26 MSE wall~|~10 - Bridge Replacement~|~75A043AE51AC35C707AAB527F826C73046050C1F 100802~|~1~|~1~|~01/STR~|~Replace structure~|~10 - Bridge Replacement~|~28AD29C74F775C848EC491D6446954A9C129F183 100802~|~1~|~2~|~02/STR~|~Replace bridge size culvert.~|~10 - Bridge Replacement~|~44CE526E19FC48A88DE76A3C7AE43835E5950DCE 117237~|~1~|~1~|~01/SAF~|~Ped facility upgrades for safety at all intersections including pedestals, sidewalk, curb ramps, conduit, wiring and pullboxes ~|~28 - Facilities for Pedestrians & Bicycles~|~E425FCE1222B9AAE1C9C08638EC3B26AAFC47E09 100341~|~1~|~1~|~01/STR~|~All work in this project. All funds are from the District Preservation Program budget. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. The federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~240ABFAD257B93C1C1F953093C4AB49295BC9503 110050~|~1~|~1~|~01/NHS~|~NHS Plan Split: DEL-37-23.00-29.08~|~05 - 4R Maintenance - Resurfacing~|~987C8D1524FED064ECDF0369F6D612569B7DAAFC 103951~|~1~|~1~|~01/IMS~|~Rehabilitate pump station ST 8~|~44 - Other~|~386DA83E9897621664F05264DE1AD94308B8C431 94085~|~1~|~1~|~01/NFP~|~"01/NFP/PV/ " - District Facilities LBM7 (100% State) - No CAP - Demolition of properties and cleanup.~|~21 - Safety~|~969E947ED60F26325295B1CEAB3AB609B134F926 110449~|~1~|~1~|~01/SAF~|~Improvements at the intersection of US 23D (Third St) and US 33 (Mound St)~|~21 - Safety~|~FD35B27CCB35BF1899FEEBCD68C3AA50A8F110DE 121359~|~1~|~1~|~01/SAF/ASD~|~install new guardrails on various county roads.~|~21 - Safety~|~F9B597E77A8387AA3DAADAFF09528022583B81F5 114400~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11.~|~21 - Safety~|~E8009988E690B8EE505CD8AA3320ED66328AC42B 124021~|~1~|~2~|~02/S50~|~Asphalt Concrete Overlay with Repairs RIC-314-1.759 to 3.018Asphalt Concrete Overlay with Repairs RIC-545-2.111 to 4.443~|~05 - 4R Maintenance - Resurfacing~|~F0195A8577C11911B103FC3D50FB9224F30C3DAC 124021~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs RIC-314-0.00 to 1.759Asphalt Concrete Overlay with Repairs RIC-545-4.443 to 10.508~|~05 - 4R Maintenance - Resurfacing~|~063B6C17752825C2D286AA9C7FD163DB2F1D2CC5 106328~|~1~|~1~|~01/SAF~|~Upgrading pavement marking and traffic signal hardware.~|~21 - Safety~|~F2C1E083CA67901AC0B2737395AA336BC8943FF3 110390~|~1~|~1~|~01/STR~|~AC overlay without repairs on:MIA SR 202 SLM 5.06 to 11.24~|~05 - 4R Maintenance - Resurfacing~|~F3AE73835FAD3DAB0BE6D2C6CDB501E4EDB824E5 110390~|~1~|~2~|~02/S>2~|~AC overlay without repairs on:MIA SR 202 SLM 11.24 to 11.62~|~05 - 4R Maintenance - Resurfacing~|~74D921988C92519FEC5125D0196AFAE9CF4D004C 124937~|~1~|~1~|~01/MPO~|~Repave Park Avenue from west side of Eaton Avenue to North B Street~|~05 - 4R Maintenance - Resurfacing~|~D0A81FCF5149F40F8406C8CEBF2D3B6517331816 101764~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7 (80 Federal)/4PS7 (20% State) - No CAP - Resurfacing and related work on PER SR 37 15.02 to 20.69.~|~05 - 4R Maintenance - Resurfacing~|~BF3B545EA79F85A6EDE49633E7998C57B24E60D0 84297~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~2812A133702F551F89485F23468615B84A44241A 103898~|~1~|~1~|~01/BRF/NEWL~|~New Lexington Municipal Bridge Funds - 4R87 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Replacement of SFN 6460054, Pleasant Street Bridge in New Lexington.~|~10 - Bridge Replacement~|~3A9CABD8FC2B35F2C12B7D0AB955794FB11DE4B1 85098~|~1~|~1~|~01/MPO/TOLE~|~resurface LUC CR501 6.24-7.09; Secor Rd. from Central Ave. to Monroe St.~|~05 - 4R Maintenance - Resurfacing~|~BC5E16EAF7B530F47B159BF1B3E74E1B483B3B95 115984~|~2~|~2~|~02/SAF/GAMB~|~Construction of shared use pathway along SR 308~|~21 - Safety~|~0CBDF7CB4C101A531B8574BAFA8F4EA3E87D7F26 115984~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 229/308~|~21 - Safety~|~B46C239FB44C56829C348E99B110E52B6289EB70 99023~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~469C8F57F88B427F8789771024268AFD2DDB622B 102066~|~1~|~2~|~02/IMS~|~Damage due to car accident.~|~13 - Bridge Rehabilitation~|~EF46FACD4710748D63A92774C4D791E7FB45A47B 102066~|~1~|~1~|~01/IMS~|~Truck fire SFN 4806115~|~13 - Bridge Rehabilitation~|~0DF6697DEFFB2746E8C7A972FDE5B13A0E8039D0 116389~|~1~|~1~|~01/NHS~|~JEF-7 and COL-7~|~05 - 4R Maintenance - Resurfacing~|~3DDDB3D1FD42025011C930ECAD22C35A26F45AE3 93782~|~1~|~2~|~02/S<2/VAN~|~02/S<2/OT/VAN ; VAN-Van Wert W. Main St. Phase II, 100% Local Funds (4BG7). Funds provided by the City of Van Wert for water works construction.~|~43 - Utilities~|~4F6624BCBDC36C77650ABC77BC5E707638CAB18B 93782~|~1~|~1~|~01/S<2~|~01/S<2/PV/ ; VAN-Van Wert W. Main St. Phase II, 80% Fed (4B97) - 20% Local (4BG7).~|~04 - Reconstruction - No Added Capacity~|~C8F6C1BAB1BF28B35E88979B795730EC800CA827 99207~|~1~|~1~|~01/S<2~|~This split is for all resurfacing work on CR 175 from SR 281 to CR 53. This split uses 80% Fed. (4B77) - 20% Local (LNTP).~|~05 - 4R Maintenance - Resurfacing~|~26B3AEC608B0F7B4AA11B5063E15A5C66DA41A9F 99207~|~1~|~2~|~02/STR~|~This split is for all resurfacing work on CR 175 from CR 53 to the Henry County Line. This split uses 80% Fed. (4B77) - 20% Local (LNTP).~|~05 - 4R Maintenance - Resurfacing~|~D6896AD02CCD71BD5E4BAB81A2FBA5E192726AD2 98017~|~1~|~1~|~01/NFP~|~Herbicidal Spraying contract for FY2020. Funded 100% state.~|~44 - Other~|~3AA6CEE37E8D24E7E027A9DC854AF991FD28E759 104708~|~1~|~1~|~01/SAF~|~improve the existing signal and add left-turn lanes on all approaches~|~21 - Safety~|~67227165C14D7F85227395F2CFC8F4CE64F28CDA 93002~|~1~|~3~|~03/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - For work on CR 273B within the Limited Access Interchange of SR 16 that is the State Responsibility~|~05 - 4R Maintenance - Resurfacing~|~838FD1D35124FD486057B2239F5854D634DB7567 93002~|~1~|~4~|~04/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - for joint seal repair work on 1) Mus-586-0311 over SR 16~|~13 - Bridge Rehabilitation~|~B91CFFDD1E56A7BB0B44C552CB21682C1F87C1CD 93002~|~1~|~2~|~02/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - for deck patching and then overlaying 1) Mus-586-0265~|~13 - Bridge Rehabilitation~|~B1CF8F6498B7605083F5C164ADEED97316653BD4 93002~|~1~|~1~|~01/STR~|~District Preservation 7BPB (100% State) and then 4PF7(80% Federal) / 4PS7(20% State) - CAP on 7BPB funding - Resurfacing with related work on: 1) Lic-SR 586-00.00 to 11.35; 2) Lic-SR 146-00.19 to 02.34; 3) Lic-CR 723B-00.00 to 00.12; 4) Mus-SR 146-00.00 to 01.97; 5) Mus-SR 586-00.00 to 04.63;~|~05 - 4R Maintenance - Resurfacing~|~2237753C22A918017E4FF5695F33A81872D69CDA 96903~|~1~|~1~|~01/NFA/SCI~|~It is proposed to replace/rebuild guardrail at various locations on the local county roads in Scioto County. 100% Fed.~|~44 - Other~|~0818E89EE3A5CFA8813DFF9B24E89E559B5A0503 123773~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~CFC0BCFD7B09BFD9A540CEA6A20DEB7FDC4B3820 77438~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs ERI-2-15.892 to 20.023, ERI-6-16.011 to 16.164~|~05 - 4R Maintenance - Resurfacing~|~353AB7AB19B63B0C255D3B88BFC34F2B73832715 92910~|~1~|~1~|~01/SAF~|~90/10 split between federal and local to construct safety-related widening of SR-252 between SR-17 and IR-480 WB to improve traffice flow.~|~21 - Safety~|~6126819EE9DB1ECCE26B9B63FB218B1E75F0C121 106269~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-3D-0.00-0.34 FRA-23-10.51-10.72~|~05 - 4R Maintenance - Resurfacing~|~034FF44C8FEF41D0A7CFB05D3818304D2B5DC355 107890~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 556 3.20-3.25.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~25DF43BEE916E3CF6003C7158862C8FD73A20D03 101769~|~1~|~1~|~01/BRO~|~Plan split to program project. Update after scope is complete.~|~13 - Bridge Rehabilitation~|~11457E856627DF1548F70156C0A9F1BD5581F61D 115981~|~1~|~1~|~01/BRO~|~Railroad grade separation~|~08 - Bridge - New Construction~|~C7C9138E34EA18279DF76BAD0EEF361CFDF7C9E9 115981~|~1~|~2~|~02/S5K~|~ORDC Share of funding ~|~08 - Bridge - New Construction~|~E4184D686D8A32B7428FB945A794525F8C624226 95538~|~1~|~1~|~01/STR~|~Resurfacing SR 9 and SR 151 in HAS county including pavement repairs and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~85A37EA4E4A056D6BF0ED2C0D3F8853A5FFCD8E2 104406~|~1~|~1~|~01/IMS~|~Plan split for paving work in the interstate~|~05 - 4R Maintenance - Resurfacing~|~F7E2D91672E154B28920206AAACA9C6454A55850 91832~|~1~|~2~|~02/STR~|~STP Rural for pavement on on CLE SR 132 between SLM 12.51 to 12.53; and between SLM 13.38 to 14.24; and between SLM 16.55 to 17.95.~|~~|~5D5132BE58587D6D3A315C9E0AD78C915BACF413 91832~|~1~|~1~|~01/S<2~|~STP Urban for pavement on on CLE SR 132 between SLM 10.8 to 12.51; and between SLM 12.53 to 13.38; and between SLM 14.24 to 16.19.~|~~|~E799F1148F99D592370340B6A3A561DC5B2BEB65 104114~|~1~|~1~|~01/NFP~|~plan split~|~44 - Other~|~2871046A693F81830B193B458F87F38D2E7F0B25 90716~|~1~|~1~|~01/ENH~|~Project includes transportation enhancements to East Sharon Road including clay paver sidewalks, reconstruction of curbs and commercial drive aprons, ADA curb ramps, decorative signing and lighting, seating benches, bike racks, trash recepticles and other amenities.~|~31 - Landscaping & Other Scenic Beautification~|~0A9A23FB842334C78F51614FDAAB19BFA53461C9 95414~|~1~|~1~|~01/SAF/HIG~|~It is proposed, using 100% Fed Safety funds from CEAO, to upgrade existing pavement markings on various county routes in Jackson County in FY2018.~|~21 - Safety~|~9D3234D359F0365575C9A3937F4987489CDC3929 126600~|~1~|~1~|~01/S>2~|~Parapet repairs~|~13 - Bridge Rehabilitation~|~8CD9E31919BB039B3FBCE64A092EA960C0EF09A0 102687~|~1~|~1~|~01/SAF~|~shoulder widening, pavement markings, signage and paving.~|~21 - Safety~|~29726B6AE97CBBA4A9D66EE40116CF3D1E209C96 102687~|~1~|~2~|~02/SAF~|~Plan split for Part B of project (waterline replacement) that is paid at 100% local funds.~|~21 - Safety~|~3200612EB2A05C0171BE49C1D38F3FFBF487063B 126298~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~1EA88373CAC5D5ADE7BB58E824C3F576856F8721 90674~|~1~|~1~|~01/MPO~|~WOO CR9 8.53-8.54 - WOO SR65 23.04-23.05Improve the intersection of State Route 65 with Lime City Rd/Colony Rd. Lime City Road bike path.~|~21 - Safety~|~C55B5F887EB7B6E7BF676460105381EF465A4B91 118152~|~1~|~1~|~01/NHS~|~Landslide repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0656937E4BDBB727E772E03C22CC1C54EDFE0DA4 114849~|~1~|~2~|~02/S5K~|~Plan split for SAN-101 from SLM 1.14 to 2.15~|~05 - 4R Maintenance - Resurfacing~|~F8F84CF82F98C799B614D17E82F51913F5EE3351 114849~|~1~|~3~|~03/NHS~|~Plan split for SAN-6 from SLM 13.77 - 13.89~|~05 - 4R Maintenance - Resurfacing~|~786AA8D68B6F0CE8D81650FCC947D6BF3ED21875 114849~|~1~|~1~|~01/STR~|~Plan Split for SAN-101 from 0.00 to 1.14, SEN-101, WOO-582, and WIL-49~|~05 - 4R Maintenance - Resurfacing~|~9113BBB1BD321C37AA02CE259A34ABCA9A2DAA6A 95399~|~1~|~1~|~01/SAF~|~Lower the approaches to the intersection of CR-15 (Gurneyville Rd) with CR-66/TR-193 (North Curry Rd) to improve sight distance at the intersection. Gurneyville Road to be lowered to improve sight distance issues away from the intersection as well.~|~21 - Safety~|~46F9A20307C5CF99DA0D23E6BE0B1A0A2E7359E8 108724~|~1~|~1~|~01/NFP~|~Install crosswalk at the SR 44 and NEOMED/Rootstown High School intersection.~|~~|~945358227CEF4171F3505F954C12B7EEFC28A959 102412~|~1~|~1~|~01/NHS~|~STA SR 43 from 25.00 to 27.20 STA SR 619 from 0.00 to 2.59~|~~|~460DC76160A38E61AD5CD4D52E660C9A3348B5DE 117400~|~1~|~1~|~01/MPO/LORD~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B5DF5C68802E4B5371F4CE57A2E04ABC8998CF46 117400~|~1~|~2~|~02/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~471507E69BABC22FFB6E7C830C268CA8E5855941 100818~|~1~|~1~|~01/STR~|~Rehab bridges on PRE-121~|~13 - Bridge Rehabilitation~|~F81F21BC78031BE20379B3DF48FE09D8B1391CEE 108354~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 218 11.95 (SFN 2702827). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~74CE0F4E27B026DFAB6C8445813F37E482DB25AA 125614~|~1~|~1~|~01/NFA~|~Plan split to cover various lighting locations. ~|~44 - Other~|~579F5F33CC3EC75F071540125293DFA51CEC6597 124735~|~1~|~1~|~01/SAE/STCE~|~Installing raised pavement markings.~|~21 - Safety~|~1DA27B926F2122DE831ECE140FAB4E63DBF0DA92 124048~|~1~|~1~|~01/NFP~|~Plan split for crack sealing preventative maintenance on various route in District 12~|~99 - State Preventative Maintenance~|~2B4C38B1D1664103C105F537F666D793AB3713B6 87722~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~8E102711E760181531F2EB317EA075B997B4605B 87722~|~1~|~2~|~02/IMS~|~Bridge Work~|~13 - Bridge Rehabilitation~|~B2B13C19AAC38BBD2C4E44A04E42086965C66553 87722~|~1~|~3~|~03/IMS~|~Truck accident on I-71 that damaged the newly placed pavement in all three lanes.~|~05 - 4R Maintenance - Resurfacing~|~ADDBF7B7FEA7950F50A27176F147A4DAB2BD87FC 91929~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. funds for Landscape Maintenance~|~44 - Other~|~6A7B79CDB451F97C5D17A60A10284BBADA2C38D9 94147~|~1~|~1~|~01/S<2/BUC~|~Mill and fill, pavement repairs; sidewalk, curb and gutter replacement; storm sewer installation on SR 98 (Plymouth Street) from SR 4 to north Bucyrus corp line (SLM 7.87 to 9.23). Includes District Allocation Funds to represent Urban Paving finacial contribution~|~04 - Reconstruction - No Added Capacity~|~69B823F13AA8B74CA252CD68567F076F5837AFF5 94147~|~1~|~3~|~03/S<2~|~urban paving only section station 46+75 to 80+43. For local 80/20 split and state 80/20 with feds.~|~04 - Reconstruction - No Added Capacity~|~668BF490DBD7A5350C86B53CDC8C90D7163C03D3 94147~|~1~|~2~|~02/S<2/BUC~|~100% City of Bucyrus responsibility - Water Lines, ect.~|~04 - Reconstruction - No Added Capacity~|~C5C5DFB53860C7DEA68AFBFFA31352BD4931D752 125625~|~1~|~1~|~01/SAF~|~Median cable barrier~|~21 - Safety~|~69DB2F451CD38C12B243D89557CE9F8D88363B76 108272~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. DSR# HOL-003~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~77927435E0B049AE36CBCB314752F4C8AC213FC7 81941~|~1~|~1~|~01/NHS~|~Bridge Replacement~|~13 - Bridge Rehabilitation~|~8679E76758BE80566CB511027B1F679207E0B7F6 102502~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Fast Dry pavement markings on District 5 Interstate Routes in FY 2022~|~21 - Safety~|~1F2268CBF74FE969DC533FCBBFDD7B291683703A 93980~|~1~|~1~|~01/BRO~|~BR funding for all work on this project at an 80/20 fed/state split.~|~13 - Bridge Rehabilitation~|~B0B57032727D8EC79F510B5F62CABE731520341D 123076~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~D34B574DB95BB01D48046BC44150A71DBB9CCCD1 113681~|~1~|~1~|~01/STR~|~Chip Seal RIC SR 98 00.00 to 04.05~|~05 - 4R Maintenance - Resurfacing~|~006DBB85E3BDFFF376F48758707425B5E9F009F5 94934~|~1~|~1~|~01/NFA~|~01/NFA/PV/ ; This split is for all resurfacing work on CR 12, CR180 and CR 698. This split uses 80% Fed. (4B77) - 20% Local (LNTP)~|~05 - 4R Maintenance - Resurfacing~|~BB74FA5D20B22F19C2D0B0E5BB46159C16075192 109970~|~1~|~1~|~01/SAF~|~District Wide contract to replace roadside delineators in FY2025.~|~21 - Safety~|~E2573E0BE22FF95129FA262EE3254851C9FBCF85 101271~|~1~|~1~|~01/STR~|~Resurfacing SR 2 in Fulton County.~|~~|~A4DDC3F61453E0C2EB29AC65E511EF5C200FC21D 95454~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) Kno-13-0.00 to 8.16; 2) Kno-SR 13-08.22 to 08.42; 3) Kno-SR 13-08.50-09.00~|~05 - 4R Maintenance - Resurfacing~|~C55FBA1EE4F1413F3065DAC5A0F2244F6B8DC6E0 95454~|~1~|~2~|~02/NHS/MTVN~|~District Preservation Urban Paving Program- 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Resurfacing in City of Mount Vernon on 1) Kno-SR 13-08.16 to 08.22; 2) Kno-SR 13-08.42 to 08.50; 3) Kno-SR 13-09.00-09.15~|~05 - 4R Maintenance - Resurfacing~|~1A57E40C0DA055A7799C05751F5EBC8068F325B9 95454~|~1~|~3~|~03/S<2/MTVE~|~City of Mount Vernon Local Funding - 4BG7 (100% Local) - No CAP - Installation of Curb Ramps along SR 586 in the City.~|~05 - 4R Maintenance - Resurfacing~|~243DCD9DDC04EE6FE69F094B130DA3B38554A402 90630~|~1~|~1~|~01/NFP~|~This is a barrier sweeping contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C5372ACC237778A1DDD116B2633F4F66A44251C6 108152~|~1~|~1~|~01/S<2~|~Urban Paving Plan split: PIC-22-17.34-18.26 PIC-188-0.00-0.22~|~05 - 4R Maintenance - Resurfacing~|~5E50C51403B8BA6848114D98851764C456F249CD 117265~|~1~|~1~|~01/NFP~|~Split for work~|~17 - Construction Engineering~|~33468B2FB2194CCB72584C1003297B574051682C 95844~|~1~|~1~|~01/MPO~|~Reconstruction of US-422 from Laird Avenue to Ridge Avenue, in the City of Warren, Trumbull County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~4CA0A5E816F873E33653AB8F068D7A89DC376AC2 123762~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance funds~|~47 - Bridge Preventive Maintenance~|~A2A8C9385F5AD00C82FC5F316FABBFC42F43A80C 93770~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. MEG 124 14.62-16.67. Rural other federal aid funded 80 federal/20 state.~|~~|~79E0FCDD887F8549B7A9FD80C1B22B0672212495 123384~|~1~|~1~|~01/NFP~|~Guardrail replacement and repair~|~21 - Safety~|~0D9D182F94C1E245E20A001C0C359AD02A124142 123384~|~1~|~2~|~02/NFP~|~Guardrail replacement and repair~|~21 - Safety~|~D02BC49BE3C2137A553C1C98D8A41D6DAC23148A 115514~|~1~|~1~|~01/SAF~|~Safety related funding up to Fed. max~|~17 - Construction Engineering~|~FFE2815607BB1678DA366CB8DC937AF67975ABF1 106325~|~1~|~1~|~01/NHS~|~Construction of noise wall along State Route 11 in Austintown Township, Mahoning County, Ohio.~|~20 - Environmental Only~|~4792461D418BA95E3DCB861B9C9320F0017183B1 121032~|~1~|~1~|~01/NFP~|~In house chip seal CRA-19, CRA-100. Capital to Maintenance transfer for chip seal and pavement repair materials.~|~05 - 4R Maintenance - Resurfacing~|~707D57B7317D71CB958CD7E739C222C18AC8CC8C 107935~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 26 22.01-22.05. Non-Federal Aid project. Funded 100% state ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DF21B65F2FA2D4BF9044B4F57559A2A67170E5ED 120900~|~1~|~1~|~01/NFA~|~Pave access road to park district ~|~44 - Other~|~6C2244726033E7CBA4A0ADA6F928F17CCE0DBAD5 94483~|~1~|~2~|~02/BRO~|~Column patching with anodes and fiber wrapped on SFN 5504260 MIA 571 1395 IR 75, SFN 1201549 CLA 41 1225 IR 70. Columns and abutment patching with anodes on SFN 7500602 SHE 47 1403. Column patching with anodes on SFN 5706092 MOT 70 1783 Bridgewater Rd.~|~13 - Bridge Rehabilitation~|~1F34309B1DA11AEF2A1F0E52CEF77B90EE42A7D2 94483~|~1~|~1~|~01/IMS~|~Column patching with anodes and fiber wrapped on SFN 0601896 AUG 75 0100 (Santa Fe New Knoxville RD.), SFN 0601950 AUG 75 0301 Pusheta Rd, SFN 0602310 AUG 75 0876 Hengstler Rd.,SFN 0602345 Buckland Holden Rd, SFN 5500184 and SFN 5500125 MIA 36 11.72 L&R IR 75, SFN 5709156 MOT 75 2292 Northwoods Blvd., SFN 1203541 CLA 70 0104 Osborne Rd., SFN 1204297 CLA 70 1151 Possum Rd., SFN 1204831 CLA 70 1886 Titus Rd, SFN 1205161 CLA 70 2329 Buena Vista Rd, and SFN 1205374 CLA 70 2739 Houston Pk. Column patching with no anodes on SFN 7502281 SHE 75 1207 Ft. Loramie Swanders Rd., SFN 1204084 CLA 70 0826 Dayton Springfield Rd., SFN 1204149 CLA 70 1024 Robert PK, Column patching with anodes on SFn 5501830 MIA 75 0440 CR 25A, SFN 5500753 MIA 41 1124 IR 75, SFN 5501350 & 5501385 MIA 55 0982 L&R IR 75, SFN 5709180 MOT 75 2356 Old Springfield Rd, SFN 5703425 MOT 40 1698 IR 75, SFn 5704448 MOT 49 1065 L Diamond Mill Rd., SFN 5705045 MOT 70 0662 Diamond Mill Rd., SFN 5705371 MOT 70 0859 Hoke Rd., SFn 5710804 MOT 675 0063 R SR 741; Tributary Holes Creek, and SFn 1204114 CLA 70 0970 Old Mill Rd. Abutment Patching with anodes (S.F.) SFN 7500602 SHE 47 1403 IR 75. Pier cap patching with annodes (S.F) SFN 5501830 MIA 75 0440 CR 25A, and SFN 5703425 MOT 40 1698 IR 75. Pier patching with anodes SFN 5710707 MOT 675-0055L, I75 (ramp V) and I75 Mainline.~|~13 - Bridge Rehabilitation~|~6EC01DC472FD645BD8AF1A9D1A9A6D47EDCBFC33 101597~|~1~|~1~|~01/STR/JEF~|~DSR# JEF-011~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~37E0E73FF14D52F0B3F955150F25A925F4EBC098 101597~|~2~|~2~|~02/STR/JEF~|~DSR# JEF-012~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~11C05E3EC5D89E5077E42CFC4AC5419886AD688D 76400~|~1~|~1~|~01/NHS~|~Resurface Frontage Roads and resurface mainline pvmt from DEL-23: 20.85-21.53 and MAR-23: 0.00-2.4201/NHS/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6BB3828EC35E3568D3BC32945A39AB0037D3AB07 76400~|~1~|~2~|~02/NHS~|~Asphalt and concrete overlays of bridges:2100630 DEL US23 19.88 Intersect: Carter Ditch5100305 MAR US23 1.85 Intersect: Over Sr98-00115100364 MAR US23 1.85 Intersect: Over Sr98-00135100399 MAR US23 2.04 Intersect: Cauquaw Cr5100429 MAR US23 2.04 Intersect: Cauquaw Cr02/NHS/BR/~|~13 - Bridge Rehabilitation~|~B012407EFF4C1966BE0200917C4E9E80ADD034A8 111356~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads in Burr Oak State Park. Funded 100% State.~|~17 - Construction Engineering~|~33CC8080FFF7A78E5795307BDB745311569905DA 113032~|~1~|~4~|~04/STR~|~RURAL AREA - Outside city and urbanized area (DEF-18 from SLM 28.80 - 28.93)~|~05 - 4R Maintenance - Resurfacing~|~01E5BD294BEEA46F27FD246B0D2300AAED5A25E5 113032~|~1~|~3~|~03/S5K/DEFI~|~INSIDE CITY - 100 percent city cost items (Items include ADA ramps and pavement repairs).~|~05 - 4R Maintenance - Resurfacing~|~9CA56D075CE3627A907FD39ED117F93CC23A8463 113032~|~1~|~1~|~01/S5K~|~OUTSIDE CITY BUT INSIDE URBAN AREA - Resurfacing on SR 281 in Defiance County. The work is inside of the Defiance Urban Area but outside of the City of Defiance. On the left side of the road from the beginning of the project until SR 281 leaves the City of Defiance on the right side at 0.45, then on both sides of the road until SR 281 enters the City of Defiance on the right side at 0.74, then on the left side of the road up to 1.35. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~D59145C237BB858A1DE4919531031D87286ED0B6 113032~|~1~|~2~|~02/S5K/DEF~|~INSIDE CITY - 80/20 ITEMS - All resurfacing on SR 66 in the City of Defiance. Resurfacing on parts of SR 281 in the City of Defiance as follows. On the right side of the road from the beginning of the project until SR 281 leaves the City of Defiance on the right side at 0.45. On the right side of the road from where SR 281 enters the City of Defiance on the right side at 0.74 until SR 281 enters the City of Defiance on the left side at 1.35 then on both sides of the road until the end of the project at SR 18. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Defiance.~|~05 - 4R Maintenance - Resurfacing~|~8BDF314C75EEE0FDC1E1F13757568B7867DB108C 84660~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 82 from 22.74 to 29.87 and TRU SR 616 from 0.00 to 0.62.~|~05 - 4R Maintenance - Resurfacing~|~F0281A8CDE5B5A4C771158C781E6A1000F6D336B 84660~|~1~|~2~|~02/S>2~|~Resurfacing of TRU SR 82 "I" (connecting ramp between SR 82 and US 62) from 0.00 to 0.16.~|~05 - 4R Maintenance - Resurfacing~|~5D33E6CD488E7B1D7A70AE20FC787043176093DA 84660~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~FFC73EC8E41EFC460DC780E19E1A94D603C974DA 84660~|~1~|~4~|~04/NHS~|~Assigned work to the linked culverts.~|~04 - Reconstruction - No Added Capacity~|~27A804FEEF6FBC01E92F6FDF8E50C2A7A0C3D0EC 125807~|~1~|~1~|~01/IMS~|~Signs~|~44 - Other~|~71ACD55DDFC932CE07EE4EC93B4B6321B1858802 107118~|~1~|~1~|~01/NHS~|~Micro surface DEL US 23 from 11.43 to 12.68~|~21 - Safety~|~46AE077961DF8A696CB6C5FBF3080B9179870C6C 101203~|~1~|~1~|~01/NHS~|~Plant split 1 created for all NHS routes for the corresponding project: DE-L23-0.00-7.38~|~05 - 4R Maintenance - Resurfacing~|~E20DFF1DC22F57B921597A069CD686979897BB70 101203~|~2~|~2~|~02/STR~|~Pavement plan split 2 created for construction contract for the following STP Rural routes: DEL-42-0.00-5.45~|~05 - 4R Maintenance - Resurfacing~|~E5947B47DB5F4A83DD3A1061040C6DA8B863559D 115636~|~1~|~1~|~01/NHS~|~RRFB on LUC-2~|~21 - Safety~|~A311ADEF416B4B1EA1153F13B27EB7BC5274BA16 115636~|~1~|~2~|~02/SAE~|~RRFB not on LUC-2~|~21 - Safety~|~7B82AAA89DF846B3FDFFF40698B0AB52EC366707 124324~|~1~|~1~|~01/NFP~|~Construction Engineering~|~17 - Construction Engineering~|~39941C8A6ADB01A361E18601A495BA66B431CE9E 109914~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D43ED30BC568937774B8D71EB874BD88F76F2DB2 118144~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~AE68F7693EB9B6ED35E8CE52F8430E564DE68C19 106204~|~1~|~3~|~03/NFP/CANT~|~Lighting upgrades on STA US 30 within the City of Canton.~|~21 - Safety~|~18EE5AD987300AAE402D7236D1E09ECB4679A04A 106204~|~1~|~2~|~02/NFP~|~Lighting improvements at the STA US 30/Raff/Whipple interchanges and STA SR 21 RCUT intersection with Butterbridge Rd.~|~21 - Safety~|~8E0A8DFBB850F6D910D1CD6412B53DDB3B29F806 106204~|~1~|~1~|~01/NFP~|~Lighting improvements at the SUM IR 271 Rest Areas.~|~21 - Safety~|~CCC78A1DDE3E846F0E4AE67748C7FF6D74169A8F 106204~|~2~|~4~|~04/NFP~|~2 year lighting maintenance in POR, STA and SUM counties. ~|~21 - Safety~|~1A6E093BA263B25891E9CED4DFA8748317E70442 112749~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6807C1384D2FB1F79D46FAF7E05ABC075E5BC82B 112749~|~1~|~2~|~02/S>2/LOUI~|~Resurfacing, urban paving in the City of Louisville.~|~05 - 4R Maintenance - Resurfacing~|~6E2922DE27DA520820BB8C74DFE6EFB0CCF7DAA4 112749~|~1~|~4~|~04/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9711B9F9F96C2D2DDFDA0DB676AA61F3B6C4073D 112749~|~1~|~5~|~05/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~C649CA59F5E38D47BD9340D75ADF328B69752BD7 112749~|~1~|~7~|~07/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~016AEB813CB77DE7097275EFBEC514B6C07F55C7 112749~|~1~|~3~|~03/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~410CF0B9545CBE074406792F18A9759FD18EF002 112749~|~1~|~6~|~06/S>2~|~Minor bridge work 10' to 20' span, lining a culvert.~|~04 - Reconstruction - No Added Capacity~|~0585AF158D9B19C429180DF6B5161A7BA5240C16 112749~|~1~|~8~|~08/SAF/CANT~|~Construct westbound right turn lane to Kirby Ave, includes 3 culverts that are project eligible and are being replaced/extended under this turn lane.~|~21 - Safety~|~1788EF60AD9AF33AA3E32B150A6A9DC43E5D6403 97342~|~1~|~1~|~01/BRF~|~SFN 7460015~|~10 - Bridge Replacement~|~B2C5DCC4D969510BFDEFC1A5349EAB3DE92E1EEE 105571~|~1~|~1~|~01/NHS~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~20CA77C8F20BE52EE80FA6CBD7DF8D9840DD9D74 93010~|~1~|~1~|~01/NHS~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacinging on 1) Cos-US 36-18.95 to 26.49;~|~05 - 4R Maintenance - Resurfacing~|~CCF39BAFFB0539D6FF327A1AB9B6CAE1C6D2ACA6 93010~|~1~|~2~|~02/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Deck patching and Sealing along 1) Cos-US 36-18.95 to 26.49;~|~47 - Bridge Preventive Maintenance~|~79A316BF2D43310A25ED423FB1B184F51A853074 95790~|~1~|~2~|~02/STR~|~Resurfacing on SR 49 & SR 191~|~05 - 4R Maintenance - Resurfacing~|~57400CB006DF77DE25F4A541C9C38EFDFBA15152 95790~|~1~|~1~|~01/NHS~|~Resurfacing on US 6~|~05 - 4R Maintenance - Resurfacing~|~DFC1B644470D6557BCAADE939D34FADEB683C694 125397~|~1~|~1~|~01/S5K/MVER~|~Resurfacing and related work in the City of Mount Vernon.~|~05 - 4R Maintenance - Resurfacing~|~C280F6F88FFA76AB3EEC8942834CE0A686FB2DA3 125397~|~1~|~2~|~02/STR~|~Resurfacing and related work on US 36 and SR 768 in Knox County.~|~05 - 4R Maintenance - Resurfacing~|~5DBA66E483EBD0A39EB7B6CAC1F2DC0E10A69505 87605~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~13 - Bridge Rehabilitation~|~1663C943C83AA75CF043E16595B2EEB563058A4E 113785~|~1~|~1~|~01/S<2~|~Railroad Pre-emption Interconnected signal pre-emption with SR 127(South Main Street)/Logan Street signal and at-grade crossing warning devices with RJ Corman Railroad.~|~22 - Rail/Highway crossing~|~4082C4EDA63293E644C3D8F8CDEB496F526BDD1E 121511~|~1~|~1~|~01/SAF~|~TSG & Lighting Maintenance~|~21 - Safety~|~3DD373D181E66556F3C411BB0F3F0C7F52E82480 113703~|~1~|~3~|~03/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~095F6451E094C2AA39CFC497A624217AF12BC5B8 113703~|~1~|~2~|~02/S5K~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~C4B0F3C8A45C34EF2099ADCBEF319BFC08B23E64 113703~|~1~|~1~|~01/NHS~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~1EF1E0E5D94190147ED4F07839D09222A2884D63 113703~|~1~|~4~|~04/S5K~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~55C03E8395BB6CF54D0A03EF3A222074B4BA49CD 113703~|~1~|~5~|~05/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~E634B1ECA8E053A62CCD06A344A151BE5BCC47FF 99577~|~1~|~1~|~01/SAF~|~Intersection improvement at Reeves and North Road, includes new left turn lanes, new signal phases and timing, new signal back plates, widen existing lanes to current design standards, resurface intersection and new pavement markings.~|~21 - Safety~|~54F412E36C7C56B39B111648D0981E65EF8BE9EE 105811~|~1~|~1~|~01/IMS~|~Interstate bridge painting work~|~47 - Bridge Preventive Maintenance~|~9EC6766A6A753CE88C97D505D75C40BB5CC4307F 105811~|~1~|~2~|~02/NHS~|~NHS bridge painting~|~47 - Bridge Preventive Maintenance~|~32C38EE0F5AA43B1BE7F7C143D7E8A92029304F1 105811~|~1~|~3~|~03/S>2~|~Urban STP bridge painting~|~47 - Bridge Preventive Maintenance~|~39042EFDA8BFA017E236C5D83AF20640389E909B 105811~|~1~|~4~|~04/STR~|~split for Rural STP painting~|~47 - Bridge Preventive Maintenance~|~C85B5CE518488D565D2BCDAAB3716712885CF2FF 99414~|~1~|~2~|~02/ENH~|~Eastport Ave Improvements including paving, curb, sidewalk, storm sewer, etc; this plan split for NON-TAP eligible items.~|~44 - Other~|~2DDB8BFBFEDBDDEACBFD72A724D8F7FE7033B5AD 99414~|~1~|~1~|~01/ENH~|~Eastport Ave Improvements including paving, curb, sidewalk, storm sewer, etc; this plan split for TAP eligible items.~|~44 - Other~|~A1085733643B1BF3E907782D65D3E6E7A6C1550F 116188~|~1~|~1~|~01/STR~|~Bridge Replacement~|~04 - Reconstruction - No Added Capacity~|~95D37A0BF59A4CE75E66568F6EE9E6E4FCD506D8 118646~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~5EF056BAC186071AD6AADC692AED01E1FA29CBA3 108877~|~1~|~1~|~01/BRO~|~CEAO Local Bridge Funding - Federal~|~10 - Bridge Replacement~|~C5D887F00F9CFB6EED8043A336B8BA16A6A38745 98468~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~56FABE6F7134A0723F1DAF88AFFC01D0125F18AC 125981~|~1~|~1~|~01/STR~|~Plan split for slope repair of CR-424~|~04 - Reconstruction - No Added Capacity~|~B8C825029E8996CE324447189D4B3FC237B5F3F9 124055~|~1~|~1~|~01/SAF~|~Intersection improvements along State St (MR 199), Water (MR 218) and Brown Street (MR 123M).~|~21 - Safety~|~1B0D5C7D43E3A2F89EA861BBD1259C912FA13B26 87138~|~1~|~1~|~01/STR~|~Resurfacing using rural STP funds. Funding from the District Preservation program. 80% 4PF7 and 20% 4PS7.~|~05 - 4R Maintenance - Resurfacing~|~5AB8BA010362C6AF7209D06DF5AB64DC06E2E24F 91904~|~1~|~1~|~01/IMS~|~Tentative split for interestate locations~|~05 - 4R Maintenance - Resurfacing~|~3E54BD7BD01987DFCD15E78A37F399F9CF4D050C 104663~|~1~|~1~|~01/NFA~|~See linked structure.~|~10 - Bridge Replacement~|~67A08C03238AE535E9DC0935EC2D86DFEEDAA8B8 118613~|~1~|~1~|~01/NFA~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~919DCF03CD4AE4CF3C272812A82DB929BD2C10FE 110889~|~1~|~1~|~01/NHS~|~Rehabilitate bridge carrying SR 7 over the conveyor belt access.~|~13 - Bridge Rehabilitation~|~C0599AFF127A86565479F97A9CCFCB6E664DB88B 88032~|~1~|~1~|~01/ENH~|~Work eligible for federal-aid from two sources:1) OH-163 earmark 80% Federal w/TRC for the 20% Local match2) MPO enhancement funds with 80% federal / 20% Local participation rates~|~31 - Landscaping & Other Scenic Beautification~|~0A440D5438CBF55CBE6E967F2D320875F4A5EBA8 106387~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair project. DSR MRG-001, MRG CR 2A 0.32. Funded 80 federal/20 local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~543129AA92B3BA66F076A144CE4D318974C0D36E 117185~|~1~|~1~|~01/NHS~|~Split for pavement work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~6CA3E977614975F0DEFBDB0E61141FAEC217A163 118883~|~1~|~1~|~01/BRO~|~Plan Split for Local Bridge funding~|~10 - Bridge Replacement~|~0CD95751D82EB58AD058BC3694B6F9025D851EB3 105774~|~1~|~1~|~01/IMS~|~Added split 1 for painting work in the interstate~|~47 - Bridge Preventive Maintenance~|~D3D9D4225D621D8BBAE7DEB21016C0D05A6C2A2C 107281~|~1~|~1~|~01/STR~|~Overlay~|~05 - 4R Maintenance - Resurfacing~|~DD5BD2A22CB76A66E888BBC89AFA185FF10652D1 107281~|~1~|~2~|~02/STR~|~Bridge preventative maintenance. ~|~47 - Bridge Preventive Maintenance~|~B4B9C839C730B5E025FCE1836ECB535230E9E61D 96605~|~1~|~2~|~02/ENH/DEF~|~This is for Transportation Alternatives funded work for the shared use path under the bridge and the lookouts. The City of Defiance has received funding approval from the Transportation Alternatives program. The funding approval as given in a September 7, 2016 letter from Jeff Shaner of the ODOT Office of Local Programs. Funding is 95% federal funds using Toll Credit with the non-federal match provided by the City of Defiance. After all federal funds are used the City of Defiance will provide all funds.~|~28 - Facilities for Pedestrians & Bicycles~|~F18AE927A2DCAE61064C3DAA1A74D43E8CD535FA 96605~|~1~|~3~|~03/NFP/DEF~|~Items funded 100% by the City of Defiance. Costs are for esthetic enhancements on the bridge.~|~44 - Other~|~A874DC1C4505AA0DF012B8440840AFB9D74F9639 96605~|~1~|~1~|~01/BRO~|~Work to replace the bridge including the lighting and rail. Esthetic enhancements are in another split. Funds from the District Preservation Program budget. One event has federal funds SAC 4PF7 and state funds SAC 4PS7. The other event has state bond funds SAC 7BPB. The SAC 7BPB bond funds shall be used first. There are no local funds in this split.~|~13 - Bridge Rehabilitation~|~C23E596B2616C576A1D229BB46870378579AF407 96605~|~1~|~4~|~04/NFP~|~Installation of a 2? conduit and appropriate pull boxes. Funds for the work to be provided by QualStar Communications, Inc.~|~43 - Utilities~|~4B30B6A76CA1C73F07C46D0CE621036762EE6A7B 100478~|~1~|~1~|~01/NHS~|~Micro surfacing of COL-11 from SLM 15.99 to 22.70.~|~05 - 4R Maintenance - Resurfacing~|~709D748E8F610CA0522E8F5FF55CBA91D2635A43 122963~|~1~|~1~|~01/STR~|~All resurfacing work included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~F8E87CE0D8F2C589D0192F52B1F3D03D85EB67CA 107479~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~43C5043AD9FA05BC008FCF4C0715CB2EBCB520E2 107479~|~1~|~2~|~02/S<2~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~3586712C307BBA101CB06BC4FED235FA6C42FFA8 104645~|~1~|~1~|~01/MPO~|~Resurfacing Rayen Ave from MLK Blvd to Watt St in the City of Youngstown, Mahoning County, Ohio.~|~~|~27B0BE421BE519687F2FA6DFB1386E20FFA2D7A9 92794~|~1~|~1~|~01/S<2/GRAN~|~"01/S<2/PV/GRAN" - Village of Granville project for the resurfacing and related work to Columbus Road frome Weaver Dr/SR 16 WB Off Ramp north and continueing on Cherrry Street to W Broadway St - LCATS funding cap of $216,662~|~05 - 4R Maintenance - Resurfacing~|~A4268A4E199B86A719969C6239E938F845D7EFB1 97548~|~1~|~1~|~01/NFA~|~Ohio Bridge Partnership Program. Lovers Lane over the East Branch of the Huron River~|~10 - Bridge Replacement~|~F42A052E75A50C5E88D363FDDCEB5E5C994980CF 125126~|~1~|~1~|~01/ERD~|~Reconstruction of Camargo Road and addition of sidewalk from Osceola Drive to Blome Road.~|~04 - Reconstruction - No Added Capacity~|~5F446B6518438D59CEE3843217FB8005D8DDE59B 119875~|~1~|~1~|~01/BRO~|~Plan split for bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~F036DFFC06FE752D3E180CA93F4E74D724A73201 90557~|~1~|~1~|~01/BRF~|~Plan split for all work on this project.~|~10 - Bridge Replacement~|~747B72FFC3A18BB5F2341228E5A4141BB79275EC 125696~|~1~|~1~|~01/BRF~|~Muni-Bridge funding for bridge superstructure replacement. ~|~10 - Bridge Replacement~|~794FC848A2836E996615DD0B01468208272FEAC0 126070~|~1~|~1~|~01/STR~|~Plan split for resurfacing US-20A~|~05 - 4R Maintenance - Resurfacing~|~06A14BACF97BF5297B6DF35678568FF43F165B01 88217~|~1~|~1~|~01/ENH~|~Add sidewalks, curbs, landscaping, street lighting, bridge underpass lighting and other amenities on Wayn Avenue from Third Street on US 35.~|~31 - Landscaping & Other Scenic Beautification~|~659D9D34570697528C9A706B7FF5200509ECDA09 123100~|~1~|~1~|~01/SAE~|~median cable barrier~|~~|~7CC2039F0330C4A2DEE336BD147E798EE98A708F 106335~|~1~|~1~|~01/SAF~|~100% State Funds for replacement of a failed culvert (Emergency Type A Project).~|~21 - Safety~|~04FDBD633938F1FB11D794F7F3AAC3593349B795 101279~|~1~|~1~|~01/STR~|~STP rural pavement~|~05 - 4R Maintenance - Resurfacing~|~A1B2850F248A63A76EEE059B00A4ADA95E98A96F 101519~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay. GAL 7 10.12-19.34. Funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~8FC3AA754C032A5B77FFA5E3AEF322C5F81FB6F5 93589~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding. Toll Credit is being used to bring the federal funding percentage to 100%.~|~28 - Facilities for Pedestrians & Bicycles~|~4E98941E6A2B3B8BC3A0E6EF5840F854544B2F46 118895~|~1~|~1~|~01/NFP~|~ITS Camera Additions~|~21 - Safety~|~8D69D236037F9B3827FF43CEAF24734E2C815F7A 87707~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE373E4E1927A901B50306C1CED35AA63174EE42 118854~|~1~|~1~|~01/STR~|~stp rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~F6CBCEC80CC3BCA98CE174CAB35349FC6327F844 97485~|~1~|~1~|~01/STR~|~Culvert replacements on CFN 500620180 MAH-62-5.01, CFN TBD MAH-14-4.83, CFN 505340210 MAH-534-4.05, CFN TBD MAH-534-6.05, CFN 505340250 MAH-534-6.11~|~44 - Other~|~73D81DBA5B2E46467E962F8D88C8A3811DB856DC 103317~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-CR 238-0259 (SFN: 0930334) which carries Lanes Mill Road over Four Mile Creek. Roadway will be widened to improve safety for motorists.~|~10 - Bridge Replacement~|~85F33618BDD535D91C356D779897ED5EC9B1A1D2 119225~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~88D5732CF696CF12BC818D56913C39318858EE1A 119225~|~1~|~2~|~02/STR~|~Bridge preventative maintenance to multiple bridges.~|~~|~60AA6116202FA7C969C1C1E949CFF7E1A5B27B4E 112288~|~1~|~1~|~01/STR~|~Slip repair project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~21 - Safety~|~B404A144496A265404C2DE5FBA2A3E16B44F07AE 117004~|~1~|~1~|~01/NHS~|~C.O. Major Rehab funds, pavement and bridge work included ~|~04 - Reconstruction - No Added Capacity~|~098426620BEC89A1278767ACA98B27D7A415D855 117004~|~1~|~2~|~02/NHS~|~C.O. Major Rehab funds, bridge work included~|~13 - Bridge Rehabilitation~|~26FFC2A485E6FB057F51528EB71DAB10C793CD3C 117004~|~1~|~3~|~03/SAF~|~Safety work. Construct RCUT at SR 511, CR 30A and Fry Rd. Median closure and remove north leg at CR 2175.~|~04 - Reconstruction - No Added Capacity~|~D775C635E230DA51CB1CA367A52D5E1237B61C59 94898~|~1~|~1~|~01/NHS~|~Culvert Replacement / Rehab Culvert Allocation~|~44 - Other~|~EC4EE25C650CE3C9C16DCFA73B8CFFBB229F724B 125221~|~1~|~1~|~01/NFA~|~Electrical maintenance contract on various routes.~|~21 - Safety~|~3461DFA6421C3CB22FE6F11E0E0B8B9B7FA56054 90456~|~1~|~1~|~01/MPO~|~Bikeway construction~|~28 - Facilities for Pedestrians & Bicycles~|~AF90A84E73342CAA96185C3F3C92E6477364C74B 108799~|~1~|~1~|~01/S>2~|~Improve drainage at several locations on DEL SR 315~|~04 - Reconstruction - No Added Capacity~|~C43C119896D8535897AA6C47CFF3631C8993CA4D 91452~|~1~|~2~|~02/NFA~|~Resurfacing of the Tuppers Plains Outpost parking lot. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~7FA86F3D399592083F2162E964C66EFCC65A5CD3 91452~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 7 0.00-1.34 and MEG 7 18.64-23.99. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~AD9EA8440B72B022DD63EA38ED668CC30255B568 96837~|~1~|~1~|~01/NFP~|~Expo Center~|~44 - Other~|~E02E3F3E5F4C291A6E425ED9E3E745F231EC6D50 105395~|~1~|~1~|~01/IMS~|~Bridge deck replacement with repairs on Interstate bridge.~|~10 - Bridge Replacement~|~565B984A1F4A58A521F87FCF1710CBB5F2D73552 95270~|~1~|~1~|~01/SAF/SCI~|~It is proposed to replace the pavement markings on various county highways.100% HSIP funds~|~21 - Safety~|~A4EC542892A5AD55B0C6DECAEF97EC41CC9D0072 124462~|~1~|~1~|~01/NFP~|~Created for TID Involvement. ~|~~|~359006D816A3F3621799620FE92CADAE2F55C3AB 124462~|~1~|~2~|~02/ERD~|~Plan split for federally eligible construction items~|~21 - Safety~|~EDB22916A59C90CB49872524E6079315FB25D916 109776~|~1~|~1~|~01/S<2~|~Fine graded polymer AC overlay~|~05 - 4R Maintenance - Resurfacing~|~F85D7D411967B715F392B054482DBDCF864E8C25 93045~|~1~|~1~|~01/SAF~|~Guardrail upgrade project. Various routes and sections. 100% Federal.~|~21 - Safety~|~D4DBEC0895180B386030A8BFE3768272B0ADEDF2 116933~|~1~|~1~|~01/IMS~|~Patch abutments, encase piers, scour protection~|~~|~766616C000314AAD31BB0F21238BFB2EA340519A 116933~|~1~|~2~|~02/STR~|~Patch abutments, pier encasements, scour protection~|~~|~373AF70B358494406E76566F63DB1F1B0CAA1B50 110175~|~1~|~1~|~01/IMS~|~Slide repair of embankments.~|~04 - Reconstruction - No Added Capacity~|~E9F7D03DB7C9A4BB8AE49DFA7D4555969E0671CA 121278~|~1~|~1~|~01/NFP~|~FY28 split.~|~17 - Construction Engineering~|~E8A13F3F9CB2BEA1D3D43639FECD09146A5221BB 121278~|~1~|~2~|~02/NFP~|~FY29~|~17 - Construction Engineering~|~9AAEAF069141EBBD4F8B4ABAF1AE979BA6655C32 121278~|~1~|~3~|~03/NFP~|~DY30 plan split.~|~17 - Construction Engineering~|~E13D527E0A0FB9D97CF8E0A850C282E06F900B70 106984~|~1~|~1~|~01/ENH~|~Plan split~|~31 - Landscaping & Other Scenic Beautification~|~E05AF49432157210CF0B268B5FB6EF1046F97950 79400~|~1~|~3~|~03/NHS~|~Plan Split for the Change Order to work in the Sharon Road intersection paid at 100% ODOT.~|~05 - 4R Maintenance - Resurfacing~|~51EF3E0FD812275CB3820EAA8A98AD4A86770BC3 79400~|~1~|~2~|~02/NHS~|~Urban Paving Project for the City of Springdale. Includes pavement planing and resurfacing in FY2013. On SR 4 from the Southern Corp (SLM 8.33) to south of Cameron (SLM 8.89). This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~56C20D472B5B8E28CB7F98604A75EFFDED1249C1 79400~|~1~|~1~|~01/NHS~|~Urban Paving Project for the City of Springdale. Includes pavement planing and resurfacing in FY2013. On SR 4 from the Southern Corp (SLM 8.33) to south of Cameron (SLM 8.89). This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~B1EE25B75DD4DFCA4BC7EEA8D7CEB4731892235B 123313~|~1~|~1~|~01/STR~|~Plan Split to program project, update at project scoping.~|~47 - Bridge Preventive Maintenance~|~9CD4939105CF15856E0AF51DC4E4C3A9A29739A9 125972~|~1~|~1~|~01/S5K~|~Pedestrian improvements~|~21 - Safety~|~EA2C0055DCAC1AB4D4003C9A62F57EC864440B28 99678~|~1~|~1~|~01/NHS~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~1E617E679FDF65F7AE621BE56BB081C4AE5823C4 99427~|~1~|~1~|~01/NHS~|~Replace existing RR bridge over US 250 (HAS-250-0081, SFN 3401472) to increase vertical and horizontal clearance under bridge.~|~17 - Construction Engineering~|~F9D787A1F6314F9FC4F478B18AD426BAF29F3CE7 113998~|~1~|~1~|~01/SAF~|~Install new/upgrade existing guardrail on various county roads in Clinton County.~|~21 - Safety~|~76C09DEA7AFFF83D694F0708A244E56E09E320B0 99706~|~1~|~1~|~01/STR~|~Split for resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~5706C1EEBCC3E6799D2A5519B532092B62A9F016 99706~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work. ~|~05 - 4R Maintenance - Resurfacing~|~1551AB41F437D72306AA73F359439A32EC44B848 99706~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0E681E3FAA48B46E5CC0535DA1351455B87A6F5A 107412~|~1~|~1~|~01/STR~|~Resurfacing of CR140-0.00 (Waldo-Fulton Rd)~|~05 - 4R Maintenance - Resurfacing~|~64922FE14024AFEB85D9AFAAB4B2D97AF6569B70 107412~|~1~|~2~|~02/STR~|~Replacement of SFN 5137241 & SFN 5137268~|~10 - Bridge Replacement~|~EABC0A11579370F0C49E44144C8E77D0856E6BFE 107412~|~1~|~3~|~03/STR~|~Placeholder plan split for culvert replacement work~|~04 - Reconstruction - No Added Capacity~|~459EC5794CC4ED0E90FF0D7294BF5CEDBAA759A1 104910~|~1~|~1~|~01/NFA~|~South Western School District school bus replacement.Thirteen 78 passenger buses at full project participation.~|~44 - Other~|~81FA1C31065E0957DA59B1BC1C9DF88EEC1676D7 104910~|~1~|~2~|~02/NFA~|~South Western School District school bus replacement. Eight 84 passenger buses at limited project participation of $84,009 per vehicle.~|~44 - Other~|~DFD70A4C895E1D5F5CFD2E838DBE5889DF2A560C 102360~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project~|~21 - Safety~|~E4D1529D9B2AE7F9EF101785C1FC3F1F764B650E 99941~|~1~|~1~|~01/NFP~|~Construction of a new Full Service Maintenance Facility in Monroe County. Includes cold storage, salt storage and brine system. Funded 100% state.~|~44 - Other~|~18CEBD7827ECFAD1F9CF2B1CDB9F49197C5A60A4 125487~|~1~|~1~|~01/MPO~|~extend a ½-mile multiuse path from RiversEdge/Marcum Park to Black Street Bridge, connecting the Great Miami River Recreational Trail ~|~28 - Facilities for Pedestrians & Bicycles~|~2BDCE45DF842EFBABEAD1BE5FECB6BFF907B0B40 93526~|~1~|~1~|~01/BRF~|~SFN 6232000 OTT-19-3.54 bridge replacement.~|~10 - Bridge Replacement~|~A7EA015A43EC621AEEDD9E0FA67183EE1F5BFDEA 120289~|~1~|~1~|~01/NFP~|~Construction Inspection/Compaction Testing~|~~|~26AA2C6322DC36C9338AB2B693CBFE89553F0BFD 97902~|~1~|~1~|~01/NFP~|~Resurface access drive to Don Scott field~|~44 - Other~|~F3894CDC8AC9C517DDD4B9B4ED13A7C27B6742DB 102626~|~1~|~1~|~01/NFP~|~Raised Pavement Markers~|~21 - Safety~|~CE0A98BDAC18F08AAA385D4EEDAAD2AB2F7835E3 124364~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~C25123EF7D7307F8B9718EA91D9FEE6F5F3282D9 111519~|~1~|~1~|~01/S>2~|~The addition of the southbound lane on Columbia will tie existing deceleration lanes along the frontage into the reconstructed Socialville-Fosters & Columbia Road intersection turn lane.~|~03 - Reconstruction - Added Capacity~|~9BA3E09B520512CDBF474CA3B3612B1EDCFA7E3A 116588~|~1~|~1~|~01/STR~|~Rural plan split for chipsealing and associated items on UNI-37 & UNI-161.~|~05 - 4R Maintenance - Resurfacing~|~BF8DEF2721121F8E74255E571196AF10A0DDC755 86962~|~1~|~1~|~01/BRO~|~8600031 WIL SR2 1.23 Intersect: Lick Creek Branch~|~10 - Bridge Replacement~|~D7EAEDAC89728058E733BBD6D08BA693B815336E 105606~|~1~|~1~|~01/IMS~|~Interstate plan split~|~~|~E29D50E70D4CFE4997F0219E6ACC6DFC986F4416 101009~|~1~|~1~|~01/SAF~|~City wide safety improvements~|~21 - Safety~|~9B8DF7988EB2FCB1FC1AD5D49A671D06A69DB849 117795~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~461396F6764AE44BFBEBFD9CC180201506388B01 104808~|~1~|~1~|~01/SAF~|~Install LED stop signs on Oxford Germantown Rd. at the intersection with SR-177.~|~21 - Safety~|~343181DF8CF103A3E0682A9B1DB7D94BF6657B37 100374~|~1~|~1~|~01/STR~|~For work on SR 199. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. Rural STP.~|~05 - 4R Maintenance - Resurfacing~|~1DB85A175496A7BEB3C16CC2E7780CD9E5E3C04A 100374~|~1~|~2~|~02/NHS~|~For work on US 23. District Preservation Program funds. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. NHS.~|~17 - Construction Engineering~|~22AF6FEF7A44D5CE3B8EBBEB865F775CE5055BFA 101854~|~1~|~1~|~01/STR~|~Project rehabs various bridges in the district by patching, rebuilding deck edges, water-proofing.~|~13 - Bridge Rehabilitation~|~F01C5126FF85DE843A8B961EBFCE6CD04FED7403 101854~|~1~|~2~|~02/NHS~|~Project rehabs various bridges in the district by patching, rebuilding deck edges, water-proofing.~|~13 - Bridge Rehabilitation~|~C38D6A49284F23BD0B573C30CC568329BC53D0CF 110547~|~1~|~1~|~01/IMS~|~Noisewall funds plans split~|~20 - Environmental Only~|~982C96FE027EB5F96B608851A11174C9AD6D93FD 126416~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with / without RepairsCRA-103-13.501 to 14.875HUR-598-0.00 to 2.071~|~05 - 4R Maintenance - Resurfacing~|~933BB0D6B5F4C55EEDE45B5772285199A6747432 126416~|~1~|~2~|~02/S5K~|~Asphalt Concrete with / without RepairsHUR-598-2.071 to 2.643RIC-61-13.194 to 14.120~|~05 - 4R Maintenance - Resurfacing~|~EDD62EFB3F1DBCF7876FA842A42F197A8E2D54AE 126416~|~1~|~3~|~03/STR~|~Partial and Full Depth pavement repairs on CRA-103-13.501 to 14.875 - village of New Washington~|~~|~B014CA3095A5C05DA8C1332C3423F53A9D8A866B 126416~|~1~|~4~|~04/S5K~|~Partial and Full Depth pavement repairs on RIC-61-13.194 to 14.120 - village of Plymouth~|~~|~F98DDB3666A459C87534E5443087F56CDB5C156F 108371~|~1~|~1~|~01/NFA~|~The TOWNSHIP will construct, or authorize construction of, improvements to US-27, Struble Rd. and Generation Dr. and associated intersections~|~01 - New Construction~|~9BEF5BF02294D3EAB460D4449030FF8255037156 105676~|~1~|~1~|~01/NHS~|~plan split for all roadway work on the NHS route~|~05 - 4R Maintenance - Resurfacing~|~787A6ADCBC4073547392067DBD62097017B20450 105676~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~895946E3AE942956C0670A99C5C6A29D9FDFA0BE 109077~|~1~|~1~|~01/S>2~|~Operations and maintnance~|~~|~F20495A776AC2F68296BB323CDF7F4E94B6A2CA6 117210~|~1~|~1~|~01/MPO/MIL~|~Plan split for OKI TA funded portion of eligible construction with a 50% local match.~|~28 - Facilities for Pedestrians & Bicycles~|~29FD20BB829095C08E0F2B86A0E200D63B684EC5 96868~|~1~|~1~|~01/IMS~|~100% state for project eligible using Type II noise wall funds.~|~44 - Other~|~EFEB0407626EC241040B9A1DB78865F6BB909242 101836~|~1~|~1~|~01/NHS~|~MED-224-15.50-16.36~|~05 - 4R Maintenance - Resurfacing~|~E1413D513CE25D94A2F535824BF688F25960575A 99153~|~1~|~1~|~01/NFA~|~J&C Funds for interstate improvement~|~03 - Reconstruction - Added Capacity~|~667D032D2E3A8A439E0AF83C976E3509F8FCB55F 77451~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~942E01F37D73EEED829665202782B29DDFD22E4E 119030~|~1~|~1~|~01/NFA~|~All work is included in this split. Funding is 100% state preservation.~|~99 - State Preventative Maintenance~|~F299E22673B34A2B204E064A535FBB6F0A45D5A3 99892~|~1~|~1~|~01/MPO~|~Resurfacing Portage Street from Wise Avenue to North Main Street.~|~05 - 4R Maintenance - Resurfacing~|~8947E36FF5EF32D268708A35D8EA7B7233BED8EB 83885~|~1~|~1~|~01/NFP~|~Split for CE costs~|~17 - Construction Engineering~|~09033199DF5A59C19F27FA0A48F7EAD1E5E33E4B 112993~|~1~|~1~|~01/NHS~|~JAC 35 18.92-21.40~|~05 - 4R Maintenance - Resurfacing~|~81380E84846A3DB7CBC226F4F9D76575717AB8C4 112993~|~1~|~2~|~02/SAF~|~Recessed-Wet Reflective Pavement Markings.~|~21 - Safety~|~7582823EF73AC00D8C616706C2F58E397AAC53DE 112993~|~1~|~3~|~03/NHS~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~82BA689B922AFBAC72748D2BC9F6CDC5DAA5A269 112993~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~718FC83DEF7F09AFD09879083BFDE112AD2C6579 123268~|~1~|~1~|~01/NFP~|~Pruning.~|~44 - Other~|~D91093DCFE10FA7980B3440BF5B759B8045BB907 119063~|~1~|~1~|~01/MPO~|~Upgrade of equipment, devices, and operation at County maintained traffic signals~|~21 - Safety~|~D0E77F204C2ED7D2554D2970EC90BF982937681D 88667~|~1~|~2~|~02/S>2~|~100% local funding split~|~03 - Reconstruction - Added Capacity~|~B0BCE2D8E881641FA8AD51C9E55F63FF0A64EFA1 88667~|~1~|~1~|~01/S>2~|~Work items eligible for federal and state funding sources using the following:o 80/20 federal/state funding split using TRAC funds.o 80/20 state/local funding split for urban paving eligible work.o 50/50 federal/local funding split using MPO STP funds.~|~03 - Reconstruction - Added Capacity~|~BF94AEDBA8CE8D984DA96D81852936726AAAD73B 122411~|~1~|~1~|~01/S5K~|~Signal upgrades and pedestrian improvements~|~21 - Safety~|~6EC4E5B5185907E790F4EC12A5B9BF17D41B4E83 89056~|~1~|~1~|~01/NHS~|~I-75 at Linn St. overpass; Linn St. from 8th to Court; Gest St. from Freeman to US50. This project is Construction Contract (CC) OH-2 of the Brent Spence Bridge Project. The purpose of this project is to replace the Linn St. overpass with I-75 and to reconstruct Gest Street from Freeman Avenue to US 50. The reconstruction of Gest Street will eliminate the roadway connection from Gest St. to Linn St.; however, pedestrian access from Gest to Linn St. shall be replaced.~|~~|~6F69CFF0AB9226213F6596F612C36854A5FB6690 106993~|~1~|~1~|~01/STR~|~GSMP slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~60315CD744451CE2792C1755B7758C75953E8073 79009~|~1~|~1~|~01/SAF/PCE~|~Widen Prospect Street (CR-74) for construction of a NB left turn lane at Summit Road (CR-148). Install a traffic signal at Prospect Street and Summit Road intersection, Ravenna Township, Portage County, Ohio.~|~21 - Safety~|~770FBC19217775A91E4582507B4EE7C649719FEA 102997~|~1~|~1~|~01/NHS~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~8F553ED50EC974FA3ED9D2B4D56524CDFF6F2916 100052~|~1~|~1~|~01/BRO~|~Replace existing multispan boxbeam bridge (COL_517-0665, SFN 1505300) with new three-span continuous slab bridge.~|~10 - Bridge Replacement~|~E26E6BDD33AD5AC2D3BCDA9831EA9E13ED06AA4A 102587~|~1~|~1~|~01/NHS~|~Work on SR 81 in Allen County from Eastown Road at 13.47 to Cable Road at 14.47. Work on the NHS. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~C3BD6D3700B4D49873FDE1E4D2DBABE9D893D532 102587~|~1~|~2~|~02/S<2/FIND~|~80% Federal urban STP funds from the District Preservation Program budget with the 20% match provided by the City of Findlay. Work on SR 37 in Hancock County from Main Street at 0.67 to Blanchard Street at 1.14 and from Blanchard Street at 1.34 to Strong Avenue at 2.57.~|~~|~C7D2129A6A281BAFFEBA7B01C140AC3E1D8E147B 117631~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction costs~|~17 - Construction Engineering~|~AAF74F9A4B44C5A89182E626E611910ACD8D2F8F 118753~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~5F894ACDCC606898FD3A5B1BD57C3608040AEF65 111631~|~1~|~1~|~01/SAF~|~All the work to construct the roundabout. Funding for the Construction Contract subphase is 90% federal funds from the safety program SAC 4HJ7 with a 10% local match. After the safety program cap is reached funding will be 100% local funds provided by the City of Lima. The Construction Engineering subphase will be 100% local funds.~|~21 - Safety~|~625DFCA873DB503B5A482E816B3E0F209F01EF56 121122~|~1~|~1~|~01/S5K~|~added bridge plan split.~|~47 - Bridge Preventive Maintenance~|~9ABC60DCBC451BD0FF5BFA8448C13943291D6289 99048~|~1~|~1~|~01/STR~|~Apply herbicides along the roadside for weed control on 4 lanes in MIA/SHE/AUG/MER/DAR~|~44 - Other~|~38801C3D8A840B3ACD56C937745866015AD15649 103165~|~1~|~1~|~01/IMS~|~Added plan split for lighting upgrade~|~44 - Other~|~EE76D030BCE9B3141A8A570A38E33FF9F0C49E4B 119152~|~1~|~1~|~01/STR~|~MEG-124-7.49-16.64 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~78898865B57D112E5D56266B6405AEF026CF2E0E 119152~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 833 0.08-.33. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~E4B36AD465A9FA8911B28F6955D10CA9F2A2ECAA 124704~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~~|~80448D414EBDB103886EC52D6922E9E37DDC28AD 90883~|~1~|~1~|~01/STR~|~District Allocation~|~13 - Bridge Rehabilitation~|~0DBBFCEE72BECB977B26D2C70D4A7FC44047D37E 126351~|~1~|~1~|~01/S5K~|~Replace PIC-221608 Bridge - Scioto River Overflow~|~10 - Bridge Replacement~|~1B5B41BD5E9EFD34CB56BD089B801F1A41481AFA 105196~|~1~|~1~|~01/STR~|~Plan split for the resurfacing of SR 726 in Preble County~|~05 - 4R Maintenance - Resurfacing~|~123E04DFEDAC463F9E7CE92201F1C61010FD3D16 104939~|~1~|~1~|~01/ERD~|~Construction of multi-purpose trail connector using TIGER funds~|~28 - Facilities for Pedestrians & Bicycles~|~5BE11FFDFAC7CA6DE23B1BE4E90D9DD5B7F7C81E 124708~|~1~|~1~|~01/S5K~|~All reconstruction work included in this plan split.~|~04 - Reconstruction - No Added Capacity~|~9D4D6FF1242BBD858F7544516A3444FBD83D600F 124708~|~1~|~3~|~03/S5K~|~All work being paid 100% locally. This includes waterline installation and sanitary sewer installation. ~|~04 - Reconstruction - No Added Capacity~|~1D72D7DA37666500D14CD256BEAB012034A950B9 124708~|~1~|~2~|~02/ENH~|~All work associated with sidewalk construction paid for using TAP funding. ~|~28 - Facilities for Pedestrians & Bicycles~|~99B87E9A32753C295D7CC2DD701F6B205F4832B6 107836~|~1~|~1~|~01/IMS~|~FRA-270-0.60 and 2.60 and all the bridges within the roadway segment.~|~05 - 4R Maintenance - Resurfacing~|~D377638D118B535083FAD1389D31F937632476B4 115433~|~1~|~1~|~01/MPO~|~Multi-purpose trail, NOACA funded~|~28 - Facilities for Pedestrians & Bicycles~|~AC31B9B655FAA6D5DC5C0614DF16900584A59D5A 113807~|~1~|~1~|~01/STR~|~Bridge Superstructure replacement.~|~13 - Bridge Rehabilitation~|~778B4BAC5352977BA01C434642EF31CED9173DDD 121812~|~1~|~1~|~01/NHS~|~Work to upgrade the interchange of IR 270 and US 33.~|~03 - Reconstruction - Added Capacity~|~A1895C2285F442C6CB11B2F2770E6DBE5FAB9A5F 109351~|~1~|~1~|~01/SAF~|~Install left-turn lanes in both directions on US-27 at New London Rd, Herman Rd, and in the SB direction on US-27 at Ross Millville Rd. Provide a TWLTL between Ross Millville Rd and New London Rd.~|~21 - Safety~|~882A087642EACA73F7C8A67F2CBF7E11DC917349 109351~|~1~|~2~|~02/NHS~|~Plan split for resurfacing SLM 2.25-2.92.~|~05 - 4R Maintenance - Resurfacing~|~F0FE5D43019D04B198426E8E748855EA6DD7444D 109351~|~1~|~3~|~03/NFP/SWRW~|~Plan split for 100% locally funded work being performed by SW Regional Water District in conjunction with this project.~|~43 - Utilities~|~CF1031CD30A275FCFDD53C8B3E843F36B053C46B 109351~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~A8506937BD5127D30456210E7F2BE0C5CC3710BD 101004~|~1~|~1~|~01/STR~|~Major 2 Funding - 5MT7(80% Federal) / 4MT7(20% State) - See CAP Comments - Resurfacing on Mus-SR 60-00.00 to 08.11~|~05 - 4R Maintenance - Resurfacing~|~C3FD92A2737733D093BC1B19330C3097A4CA8CFB 101004~|~2~|~3~|~03/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Replacement of two box culverts located at MUS-60-0.30 and MUS-60-0.90.~|~10 - Bridge Replacement~|~44DDA50230A3C24B3F667E99B160992F8AF8576F 101004~|~1~|~2~|~02/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) /4PS7 (20% State) - No CAP - Remove deck surface, perform repairs and resurface on two bridges located at MUS-60-03.20 and MUS-60-07.62.~|~13 - Bridge Rehabilitation~|~4E8FEED5493849C0D6EFFED6A49C81CF50FE8CC3 101004~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0F809714311AEF06AF73B426789828CF8D4BF96F 123673~|~1~|~1~|~01/SAE~|~Construct roundabout and intersection improvements.~|~21 - Safety~|~FC3E6ADE37E215E195697AEC227503890C8058AB 101307~|~1~|~1~|~01/IMS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~5A4CAE4B08FC9E1B6F8DBD76AF9C539074CC12DF 101307~|~1~|~2~|~02/NHS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~EA911108AC2F3D29C091540068F9414CB27795EB 101307~|~1~|~3~|~03/S<2~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~49B3E9276D89A10EF462B7F8B8B9D5DEA6BD4557 101307~|~1~|~4~|~04/STR~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~3841D58E8D79461416D974D7D7171604956051A0 101307~|~1~|~5~|~05/S>2~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~0A428F93CBCA8F27357B8D0419D693FA896C768C 92264~|~1~|~1~|~01/STR~|~Culvert Construction/Repair~|~44 - Other~|~CAD50DCF0DCF6378091186206AAC9B7060676AEC 111174~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Replacement of SFN 2302314~|~10 - Bridge Replacement~|~E2B0475BD3D85DC00B87BE1CDBFB3C615984A068 117433~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2793F7A096849108189CCA874324FA883A6FDA29 103790~|~1~|~1~|~01/SAF~|~Install signs - Safety~|~21 - Safety~|~1DF9CB1DBE373F75E889C3F2BE9CD483777FDA68 78256~|~1~|~1~|~01/IMS~|~priority system minor rehab. on TUS-77-27.73 to 34.97; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~400646B55305E023144FF4D83EDF08DD568C0508 78256~|~1~|~2~|~02/IMS~|~TWo bridges SFN 7903871 and SFN 7903901 decks to be patched.~|~13 - Bridge Rehabilitation~|~A0E073D54C64290D339DE638C93A49895DA33570 88810~|~1~|~1~|~01/NHS~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~908C71468D1AF14E0180D32E2671D514CFAD3DC7 90943~|~1~|~1~|~01/S>2~|~The project entails the drainage system study adjacent to the intersection of State Route 73 and State Route 4 in Butler County. Once study is complete, construct a new flow control chamber to prevent water from Dick's Creek and the Great Miami River from backing up through the storm sewer into the area of Middletown protected by a levee. Construct the chamber and access drive on the inside edge of the loop ramp from S.R. 73 east to S.R. 4 north.~|~04 - Reconstruction - No Added Capacity~|~E3E8B6036079FB74133C930D41D0619C4F0FDE0E 103753~|~1~|~1~|~01/SAF~|~Widen SR 747 in the City of Mason~|~21 - Safety~|~3F396307C7C84BC1B386ACFE940B2308283BB79B 103753~|~1~|~2~|~02/ENH~|~Plan split to cover the Transportation Alternative eligible improvements, including construction of sidewalk and a shared use path along SR-741.~|~28 - Facilities for Pedestrians & Bicycles~|~A2C88611694D40F2A1A6D6F72A0102418339BC45 103753~|~1~|~3~|~03/NFP~|~Plan split for non-project eligible utility upgrades being included by Greater Cincinnati Water Works.~|~43 - Utilities~|~168E027812A8FBA92A692CB078B781934B1CE919 99897~|~1~|~1~|~01/MPO~|~115 signal controller upgrades~|~21 - Safety~|~97FED2248ABCEEC69976C5F50544FBB45F6D62D9 119842~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT - 100% 4PS7 Funding~|~21 - Safety~|~8448E281AA3775EEA542D2EB69FC2F01F318899A 122133~|~1~|~1~|~01/SAF/FCEO~|~Safety funded reduction of Fisher Rd from 4 lanes to 3 lanes, adding buffered bike lanes and sidewalks along both sides.~|~21 - Safety~|~791937BD5D2F34444808D0C75EC5A431416468EC 124273~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~21 - Safety~|~89FD59EAFDBAB2ECE100182319EE2B86697409C2 93450~|~1~|~4~|~04/NHS~|~Structural steel painting on SFN 5701953 MOT US 35 1594 L, SFN 5701945 MOT US 35 1594 N, SFN 5701988 MOT US 35 1594 R (not BR eligible), SFN 5702372 MOT US 35 1649 and SFN 5701554 MOT US 35 821.~|~13 - Bridge Rehabilitation~|~9598A9B78928BAAB8C332488C9F61E41EC62A885 93450~|~1~|~2~|~02/S>2~|~Structural steel painting on SFN 5710510 MOT SR 741 838 (BR eligible).~|~13 - Bridge Rehabilitation~|~C3C62D28374B4854342C1F0287F4CE5A577A3DE4 93450~|~1~|~5~|~05/S>2~|~Structural steel painting on SFN 5703409 MOT US 40 1442~|~13 - Bridge Rehabilitation~|~C87E1D8A173F21DCCB8630C1565BE063A1C6B07D 93450~|~1~|~3~|~03/NHS~|~Structural steel painting on SFN 5701899 MOT US 35 1564 (BR eligible).~|~17 - Construction Engineering~|~C8E037A5EA421106A5F3CD43DFFD87FC07338BE1 93450~|~1~|~1~|~01/IMS~|~Structural steel painting on SFN 5703425 MOT 75 2086 (not BR eligible).~|~13 - Bridge Rehabilitation~|~D91DA6C5C89DFD65C43F493037683A8B19EF6F31 94748~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/PAV/LANC" City of Lancaster resurfacing project utiilizing Large City Funds~|~05 - 4R Maintenance - Resurfacing~|~295ACD3AF2ED6E55CF309413EFE0B8094C3C1457 94748~|~1~|~2~|~02/S<2/FCEO~|~"02/S<2/PV/FCEO" - Resurfacing of roadway outside of the Lancaster Corp limits that Fairfield County Responsible for local match thru agreement with Lancaster.~|~05 - 4R Maintenance - Resurfacing~|~DCF322F7EE34F400546C113D7271C33A2D50C125 114939~|~1~|~1~|~01/S>2~|~Replace deficient box culvert.~|~~|~E3190B9D410A5A3C0A45BDC2333C622E25AAE9E2 101177~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CLA SR 54 SLM 10.75 to 11.75~|~05 - 4R Maintenance - Resurfacing~|~C37645EDCA21039A47760A904AF84255731F0547 111318~|~1~|~1~|~01/NFP~|~LOR TID Transportation Drive~|~04 - Reconstruction - No Added Capacity~|~E42010FB58DD5D38122A989A384FF55144ED156D 120833~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation. ~|~47 - Bridge Preventive Maintenance~|~F140BA200DB52183BCEBB1570DE03A061240478D 91556~|~1~|~1~|~01/STR~|~General system paving of US-42 from SR-61 to Richland County line and on SR-61 from US-42 to Mt. Gilead N Corp~|~05 - 4R Maintenance - Resurfacing~|~296C18B4B5DED29BBF4762954F32D75C4ACF0F4F 126366~|~1~|~1~|~01/BRO~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~9029AC9E81E8FD6A3C04A751A55BEBBACD15E074 95998~|~1~|~1~|~01/BRO~|~SFN 8601178~|~13 - Bridge Rehabilitation~|~7FD00340534689686D8C4E51E3FE17EFC35A0E2A 95998~|~1~|~3~|~03/SAF~|~Center Line Rumble Stripe Plan split - Wil-20A - 0.00 to 1.10~|~21 - Safety~|~9AEED3DBD47D8601BD9E3ABA8D9FADA898126467 95998~|~1~|~2~|~02/STR~|~Roadway portion 20A slm 0.00-1.10~|~05 - 4R Maintenance - Resurfacing~|~07D191BB05C3D55BD61B6A87272E94AA87DC6CA6 86633~|~1~|~1~|~01/CMQ~|~ Add bicycle and pedestrian facility to east side of Plainfield Road from Cooper Road to Glendale-Milford Road in Blue Ash including curb and shoulder; extend existing culverts as needed;construct retaining wall where required;adjust drainage catch basins and manholes as needed; utilitiey poles will not be relocated.~|~28 - Facilities for Pedestrians & Bicycles~|~F5607FC4D7C48577C8B09903275EFA5E78B897E2 112610~|~1~|~1~|~01/ENH~|~Rehabilitation of the Cemetery Bridge over the Mahoning River in Newton Township.~|~~|~6705FCCE836C5896AAB5F8CEDF965D52106CB62E 98296~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10. Funded 80 federal/20 state.~|~21 - Safety~|~82590A47A2E0DC584A5CE981617C2E5EA13EC747 98296~|~1~|~2~|~02/S5K~|~Extrusheet sign replacement project on WAS 60 3.40-4.79. Urban other federal aid funded 80 Federal/20 State.~|~21 - Safety~|~ADF66F25073990B43C7FE9C5AC70830BB745CE4F 116625~|~1~|~1~|~01/STR~|~WOO-25 from SLM 6.24 to 6.285~|~05 - 4R Maintenance - Resurfacing~|~417F59E8256E8E4C2484E3C42A6D65B149931610 116625~|~1~|~2~|~02/S5K~|~WOO-25 from SLM 6.285 to 7.40~|~05 - 4R Maintenance - Resurfacing~|~B35188A03B43DA8C4F2222AB2EB60CF6BE739D5C 96257~|~1~|~1~|~01/NHS~|~Drainage Improvement HUR 224 Bullhead Road Area~|~44 - Other~|~A495CAFD097ADCBE4D8E9133078C95E2D7B533F0 92886~|~1~|~2~|~02/S<2~|~Urban Paving LOR-611D-0.00-0.44 - 80/20 Fed/City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~D6845C8CC0E479D7CADDF19804346BC739C27015 92886~|~1~|~3~|~03/NHS~|~NHS Pavement 100 % City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~12884DABC01831489C0CD9BC31C5C7CC90437BE2 92886~|~1~|~4~|~04/S<2~|~STP < 200000 Pavement 100% City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~9F6070D20C66985C5FDE3505B2DB09D846BFA0EC 92886~|~1~|~5~|~05/NHS~|~NHS Bridge Work: LOR-6.5.31, LOR-6-9.67, LOR-611D-0.09L~|~13 - Bridge Rehabilitation~|~E19A4160F97F68E399FC8D1ECD1076A8F58AEA52 92886~|~1~|~1~|~01/NHS~|~Urban Paving LOR-6-3.37-12.36, LOR-57-26.82-27.31 - 80/20 Fed/City of Lorain~|~05 - 4R Maintenance - Resurfacing~|~1050BCE689E85336711185784E0A291B39DF71A8 97504~|~1~|~1~|~01/BRO~|~Bridge deck replacement of the Ohio Bridge Partnership Program (OBPP). On the federal aid system. Functional Classification Collector.~|~13 - Bridge Rehabilitation~|~FD946D31A68A16C4A2C3F0059C023D5BACDF5555 105168~|~1~|~1~|~01/MPO~|~Construction of a 12'-14' foot shared-use path and parallel 6'-8' wide pedestrian path to extend the proposed Wasson Way Trail network from Tamarack Avenue to the west, across the existing RR bridge over IR-71, terminating near the intersection of Floral Avenue and Elsmere Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~63BF6F03B99D3FFF8A4E710E2044B1D8D7CFFBE8 100872~|~1~|~1~|~01/NFP~|~District 10 two year mowing project for CY 2020-21 along Interstates and Interstate look-a-likes (4 LN). Funded 100% state.~|~44 - Other~|~8E21E65D880B89D9B35B13DE58066E53E9305B1A 94193~|~1~|~2~|~02/S>2~|~General system portion of project, SLM 31.65-33.70~|~05 - 4R Maintenance - Resurfacing~|~176A5810E395C791989F3A4DFA61F459899F0C17 94193~|~1~|~1~|~01/S>2~|~New Albany urban paving portion of project, SLM 27.49-31.65~|~05 - 4R Maintenance - Resurfacing~|~28432939925BEE7EBBF54E59158B47FF1E32516E 106443~|~1~|~1~|~01/BRO~|~KYTC's Share of the Bridge Work.~|~47 - Bridge Preventive Maintenance~|~1100F6B6FDB4937BDBAB97346F32246C6BB0A37C 106443~|~1~|~2~|~02/BRO~|~OH Share of the Bridge Work.~|~47 - Bridge Preventive Maintenance~|~966B44046578786ACB52DB15C1AC6D09AF8B44BB 106443~|~1~|~3~|~03/NHS~|~12th Street Bridge~|~47 - Bridge Preventive Maintenance~|~57E470B85FBF2E2F394E6C6EAA8B8A342474CBA5 121598~|~1~|~1~|~01/MPO/BARB~|~New roundabout.~|~04 - Reconstruction - No Added Capacity~|~6B379C7BF7934C20DC12E94CE83A0FC47ED21910 105897~|~1~|~1~|~01/NHS~|~Bridge split~|~13 - Bridge Rehabilitation~|~4607514431839039E1846740B553AFD3F460E540 116800~|~1~|~1~|~01/S5K~|~Split for STP urban section ~|~05 - 4R Maintenance - Resurfacing~|~D09041C364D740116C73C76195ED40F4BC4ED111 116800~|~1~|~2~|~02/STR~|~Split 2 for resurfacing on the STP Rural section~|~05 - 4R Maintenance - Resurfacing~|~931614DCE510491C1ECE606354B89562F7D2D255 97648~|~1~|~1~|~01/BRF~|~SFN 4863135~|~10 - Bridge Replacement~|~A9929C76426222A82D17EA8143B1C2F4D4A68A6E 112494~|~1~|~1~|~01/STR~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~E50DEC9D99907CC8F9500DB4BB66EFF81A8A0F5E 112494~|~1~|~2~|~02/NFA~|~Resurface with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~ADDED447C18BA78437C6D1BCBF0FF7AD024DDAE2 76975~|~1~|~1~|~01/NHS~|~BR Funds eligible Bridge Replacement~|~10 - Bridge Replacement~|~503AFE041CF4F7A54E3CD47E08479F3564DEEF01 98522~|~1~|~1~|~01/BRO~|~District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~48A7FDFA499453381992653BDA3375346DBCEBD7 99576~|~1~|~1~|~01/SAE~|~Upgrading existing guardrail on various Richland County roads.~|~21 - Safety~|~08FCFFC82475FAFFCED27EB4AAD11CA95E2C8954 97682~|~1~|~2~|~02/NHS~|~Type B emergency for rail and deck repair to HAM-50-2064L structure (sfn 3103226).~|~17 - Construction Engineering~|~177716875C13C69EBC79660F34BC72B1A1180200 97682~|~1~|~1~|~01/NHS~|~Type B emergency project for the rail and deck repair to structure HAM-50-2064L (sfn 3103226).~|~13 - Bridge Rehabilitation~|~2272CD8EFE7F3179308EC26B39BC46409155734F 97769~|~1~|~1~|~01/IMS~|~SFN 1204653, CLA-70-1633, East Possum Road - SFN 1204920, CLA-70-2015, Platttsburg Road Remove existing LMC overlay and replace with SDC overlay using hydrodemolition. Rehabilitate/seal expansion joints and rehabilitate/patch abument backwalls.~|~13 - Bridge Rehabilitation~|~9B89CB2C871BB88D195A004F78EEDEDFAFEF2C3B 111430~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E9B0B3AA9A327119CF5CA3F4C1D31F9DAC0FEF1F 124411~|~1~|~1~|~01/SAF~|~Intersection improvement~|~21 - Safety~|~1346364DA1FEB475A198FEF30060477642FAA615 103506~|~1~|~1~|~01/NHS~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~020AE963060562A4E9283F9128E09B0E0706A809 100860~|~1~|~1~|~01/NHS~|~ADA 52 16.14-20.69~|~05 - 4R Maintenance - Resurfacing~|~8C6052B0D9AB63C6DA069E6BCB000F0AAF493F1A 100860~|~1~|~2~|~02/STR~|~ADA 770 0.00-3.47~|~05 - 4R Maintenance - Resurfacing~|~5143B19D69DE7F22651757C559E94495177D52A3 100860~|~1~|~3~|~03/NFA~|~ADA 770 3.47-10.52~|~05 - 4R Maintenance - Resurfacing~|~D1F886380CEBAA8E094F72F74073522E48D277F9 100860~|~1~|~4~|~04/STR~|~Bridge plan split placeholder.~|~47 - Bridge Preventive Maintenance~|~0ADCFF146EF75359C87DDDEEC98008FFD767E03F 98646~|~1~|~1~|~01/NFP~|~Lighting contract.~|~44 - Other~|~A7C49BE47253DB0854CB2991438F9FC3C1024F8B 108920~|~1~|~1~|~01/NFP~|~ASD-3-6.81 to 8.25WAY-3-0.00 to 8.67WAY-3-8.67 to 11.94~|~05 - 4R Maintenance - Resurfacing~|~4C61BC399BE4D0CD08C3A9FC9A8A1CE22881722A 108920~|~1~|~2~|~02/NFP~|~Structure work on:WAY-3-9.12WAY-3-11.63 (L)WAY-3-11.63 (R)~|~13 - Bridge Rehabilitation~|~0F70BE987D5599F682307299BFEF3C4CC2ED1356 91834~|~1~|~1~|~01/S<2~|~General System; minor rehab. on BEL-149-0.00 to 1.64 in the village of Bellaire; mill and fill, curb ramps, pavement marking~|~~|~6848B7DBF9487384B5F2AE0D8AA905A668E29044 100527~|~1~|~1~|~01/NHS~|~Fix approach pavement to the ramp bridge over US 52 on US 62 0.17 (SFN 0801313).~|~13 - Bridge Rehabilitation~|~187F9F7FFE8BA2E0C56F450B5CC973B2355C0F9B 25684~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Marking pavements after resurfacing of 1) Mus-IR 70-00.76 to 01.46; 2) Lic-IR 70-28.93 to 29.42; 3) Mus-IR 70-01.46 to 05.56; 4) Mus-CR 30-02.15 to 02.34~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~039AFBA39230AAD72C064727A461AF4D1AC60E37 25684~|~1~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation Program 4PF7 (90% Federal) / 4PS7 (10% State) - Bridge Rehabilitation of: 1) SFN 6002315; Mus-IR 70-01.98L carrying IR 70 over Kent Run - Not BR Eligible for Rehabilitation: Length = 198'; SD/FO = (0); SDR = 90.3; DR = 7; 2) SFN 6002374; Mus-IR 70-01.98R carrying IR 70 over Kent Run - Not BR Eligible for Rehabilitation: Length = 198'; SD/FO = (0); SDR = 90.3; DR = 7; 3) SFN 6002404; Mus-IR 70-02.99L carrying IR 70 over CR 28 Hopewell Rd - Not BR Eligible for Rehabilitation: Length = 139'; SD/FO = (0); SDR = 90.3; DR = 7; 4) SFN 6002439; Mus-IR 70-02.99R carrying IR 70 over CR 28 Hopewell Rd - Not BR Eligible for Rehabilitation: Length = 120'; SD/FO = (0); SDR = 89.3; DR = 7;~|~13 - Bridge Rehabilitation~|~06F052163CA3492445D3F362A1AFB814EA9DB253 25684~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing of 1) Mus-IR 70-00.76 to 01.46; 2) Lic-IR 70-28.93 to 29.42; 3) Mus-IR 70-01.46 to 05.56; 4) Mus-CR 30-02.15 to 02.34~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~097B0A09BFF2076C8DE58EA81BC981114B7F18AB 98759~|~1~|~1~|~01/IMS~|~SFN 8703752~|~44 - Other~|~4ADF2C5BF60CB32EAAAECB7DFD76F3A31D071685 76828~|~1~|~1~|~01/IMS~|~90/10 fed/state fund split for all work using federal IM funds~|~04 - Reconstruction - No Added Capacity~|~D6F893F439FCF445DA85AA3C477ED9298C8F4FE5 99616~|~1~|~1~|~01/NHS~|~Replace culvert type bridge carrying SR 39 over Thompson Park Creek.~|~04 - Reconstruction - No Added Capacity~|~E302095715A804D384FA00EA438CAA97AE42D35D 81627~|~1~|~1~|~01/NHS~|~NHR Rural Culvert work~|~13 - Bridge Rehabilitation~|~84C44CC87B73C577F2A32458705F826D2FB2A31F 81627~|~1~|~2~|~02/STR~|~Rural Culvert work~|~13 - Bridge Rehabilitation~|~4DA62672C9CF0487A6A2E43B37F4362E7903B02D 81627~|~1~|~3~|~03/STR~|~Rural Bridge >20' work.~|~13 - Bridge Rehabilitation~|~182D07B91F46C7C69E9371D73A5AE07FEAB23360 81627~|~1~|~4~|~04/NHS~|~NHS Urban Culvert work.~|~13 - Bridge Rehabilitation~|~470323FC58C4133F374CA0D41DC6E89FFC265C2B 81627~|~1~|~5~|~05/S>2~|~Urban culvert work.~|~13 - Bridge Rehabilitation~|~2E6E25B5A36D380AE2784D5DD2442552605A7459 81627~|~1~|~6~|~06/S>2~|~Urban Bridge 10' - 20' work~|~13 - Bridge Rehabilitation~|~2407E24E3CEF44C545F808DCF4039A60396835A6 81627~|~1~|~7~|~07/NHS~|~NHs Urban bridge > 20' work.~|~13 - Bridge Rehabilitation~|~E3642AA92D9791DC958830B1523FC4EC6E999FC7 81627~|~1~|~8~|~08/NHS~|~Local participation for the cleaning of the 24" pipe that is located 1,000' N of the intersection of Franklin Road.~|~13 - Bridge Rehabilitation~|~48D79EA86457AB8CDB577630106071D2CEFD846E 111626~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4.~|~~|~948B30F618F527E63AF1BD9087209B4ADFC411C6 109907~|~1~|~1~|~01/NFP~|~All work in this project uses this split; 100% State funds from District Preservation Allocations.~|~13 - Bridge Rehabilitation~|~DB51C7ED323E39C81DCADD50BF82F5FAFA50AFF1 88815~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~8A248C2D37BC8BF58549756FE3DD2E4A841E5C86 88348~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1808672; CUY-090-2410 and 1808702; CUY-090-2463.~|~13 - Bridge Rehabilitation~|~6B8465E9E40FFC32456E758A39A3CD5EA6312521 88348~|~1~|~2~|~02/SAF~|~Split 2 for safety funding for speed enforcement~|~21 - Safety~|~0B9D1D56641897E6CAF15673C887FC58C209CC54 88348~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~E4CA7D871AC5AD4494E2A8938CAE1D54472353C3 94303~|~1~|~1~|~01/IMS~|~Storm sewer outfall and system to treat runoff~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~11920A3A6667BD2D93803B0CA907F16D1A7AFB9A 94303~|~1~|~2~|~02/IMS~|~Waterline and sanitary line for project 4A~|~43 - Utilities~|~2914C4F0EED2D1EE5ACB15228F35CF12FA50CCF2 94303~|~1~|~3~|~03/IMS~|~Delay costs attributable to AT&T~|~43 - Utilities~|~ED8CD41590D6C974D58E60A924AF2711A9C69EE2 105225~|~1~|~1~|~01/IMS~|~Replace and widen concrete slab bridges on Interstate route.~|~10 - Bridge Replacement~|~D8779AC517F0F7340DAA5109EE26D49A5453169E 21758~|~1~|~1~|~01/S<2~|~Rehabiltiate Bridge BUT-128-0856 over the Great Miami River by replacing the rigid overlay, repairing the concrete sidewalks, and replacing the expansion joints. Rehabiltiat Bridge BUT-128-0972 (Witt Way over SR 128) by replacing the asphalt wearing surface.~|~13 - Bridge Rehabilitation~|~26C6BF52B6A360833DFC1277D2EEA78D63FB68ED 21758~|~1~|~2~|~02/NHS~|~For work performed on NHS bridge.~|~13 - Bridge Rehabilitation~|~7D324E69B279D1A9544B7D873EDB028C24BE1E30 21758~|~2~|~3~|~03/NHS~|~This plan split is for the decorative fencing to be paid by the City of Hamilton. City of Hamilton agrees to pay for costs beyond that of standard ODOT vandal fence.~|~13 - Bridge Rehabilitation~|~A424101293A2AC0069FFAB65475D5AA77A0B3DBD 124807~|~1~|~1~|~01/NHS~|~Culvert replacement NHS~|~44 - Other~|~45A6821D203443E9736FC151BB7F0782FABB25FD 124807~|~1~|~2~|~02/STR~|~Culvert replacement STP Rural~|~44 - Other~|~D064A7F2998AB623FF935F99BBD6BB0F320E5D4E 124807~|~1~|~3~|~03/NFA~|~Culvert replacement Not on Federal Aid System~|~44 - Other~|~6636FE4EDCC66112FDC1A646D2CB62FABC48ED15 115810~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County CEAO Highway Safety Improvement Program Funding - 4HB7 (80% Federal) / LNTP (20% Local) - See CAP Comments - Conversion of Intersection to a mini-roundabout.~|~17 - Construction Engineering~|~245DB1929DCD8A61C912DD6F7EFE46016CD12200 115810~|~2~|~2~|~02/SAF/OT~|~"02/SAF/OT/MCEO" - 90% Federal (4HJ7) and 10% State (4BC7) - roadside ditch improvements and signing/marking improvements.~|~17 - Construction Engineering~|~9624E4C15CB988A9B8E05B3FA3984BB59EF9B4E4 101119~|~1~|~2~|~02/NFA~|~Smooth seal on Non-Federal routes: DAR SR 503 SLM 7.70 to 9.20~|~05 - 4R Maintenance - Resurfacing~|~F112DA98B4BFBBB17B7AAC10F12C9E98E58CB24F 101119~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: DAR SR 503 SLM 0.00 to 7.70 & DAR SR 721 SLM 0.00 to 2.90.~|~05 - 4R Maintenance - Resurfacing~|~08189CC6432A4C8ABFAB62D40A2E9A1247F4E607 84607~|~1~|~2~|~02/STR~|~Minor bridge work to US-6-1.89 (SFN#0400068) over Hoskins Creek, SR-534-12.06 (SFN#0406988) over Trumbull Creek.~|~13 - Bridge Rehabilitation~|~33F741B5AE6633449EDAF8B8FDF3F9D20DC4C049 84607~|~1~|~4~|~04/S<2~|~Bridge work on ATB-SR534-25.25 (SFN# 0407143) over Cowles Creek, in Geneva Township, Ashtabula County, Ohio.~|~13 - Bridge Rehabilitation~|~4C8763CC0924648FBD826AD02C2240AB413F472B 84607~|~1~|~1~|~01/STR~|~Resurfacing of US-6 from SLM 0.00 to 0.08, US-6 from SLM 1.54 to 2.63, and SR-534 from SLM 7.77 to 13.50 in Hartsgrove and Trumbull Townships.~|~05 - 4R Maintenance - Resurfacing~|~7D43C28719ADDEFF32AF889304B7CB3EF850915C 84607~|~1~|~5~|~05/S<2/Gene~|~Resurfacing of State Route 534 from SLM 22.22 to SLM 22.54 in the City of Geneva, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~D1C3BA92F2E02689389778A3DC619C30E94DC5CB 84607~|~1~|~3~|~03/S<2~|~Resurfacing of State Route 534 from SLM 22.54 to 25.25, in Geneva Township, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~E98A09A3FFB9C0AF28A8BA1B51A9C8C67565D873 121589~|~1~|~1~|~01/STR~|~Resurfacing work for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~5D78780638A8F77E8847C0A89BF300231C202F6B 121589~|~1~|~2~|~02/S>2~|~Resurfacing work for STP >200,000~|~05 - 4R Maintenance - Resurfacing~|~655CB9C3E8A5440682B0139ACA91232EDFF424EF 100634~|~1~|~1~|~01/STR~|~Chip sealing COL-172 from SR 9 to US 30.~|~05 - 4R Maintenance - Resurfacing~|~770B6D481EFC8A667A5BAAAF90A4CD8C765853A4 119578~|~1~|~1~|~01/S5K~|~Purchase LED speed limit signs~|~44 - Other~|~099BAAC03F4A7EC7ECF957AB7EF98767B5F8865D 95363~|~1~|~3~|~03/SAF~|~WOO-20 from SLM 2.70 to 2.79~|~21 - Safety~|~32E3E27724184188E8662E5B3BE91BFF5594DBD0 95363~|~1~|~1~|~01/IMS~|~LUC-75-8.76 to 9.50 LUC-475-4.26 to 4.50 LUC-475-4.76 to 4.99 LUC-280-5.26 to 5.50~|~21 - Safety~|~36D46C93D2B7D9DFB1D5BAE90DDBD80B113D3574 95363~|~1~|~2~|~02/NHS~|~LUC-184-9.76 to 9.99 WOO-20-2.79 to 3.00~|~21 - Safety~|~FB9EB50EC8A56EDE4B39088F43A68C19E0F7DA78 112705~|~1~|~1~|~01/IMS~|~Culvert work at FRA-70-7.38~|~04 - Reconstruction - No Added Capacity~|~336C17FF12E53B50348BB1102008F3222300F979 127014~|~1~|~1~|~01/MPO~|~Created Plan Split.~|~28 - Facilities for Pedestrians & Bicycles~|~A1F8F16CD197B81FD8FBE8A44E42893121498640 125293~|~1~|~1~|~01/NHS~|~Pave culvert invert. GAL-35-13.05, CFN 1819532.~|~~|~4DA75DE62348EE43B8DB473E4E6C8F1AA69B4FF7 125293~|~1~|~2~|~02/STR~|~Pave culvert inverts. ATH-329-1.87:1827745, ATH-329-4.57:1828571, GAL-160-8.08:1821145, GAL-588-8.83:1829085, HOC-180-14.68:1811420, HOC-180-14.50:1811421, HOC-664-7.10:1813995.~|~04 - Reconstruction - No Added Capacity~|~41DB560B5A5C80021328542625AF6CB925F7D2BB 125293~|~1~|~3~|~03/NFA~|~Pave culvert invert. ATH-690-2.83, CFN 1871146.~|~~|~637C40740E71D4181E184840D5F2060419E81C84 101985~|~1~|~1~|~01/NFP~|~Herbicidal spraying on various routes throughout District 4.~|~~|~53568538F577894396040D355B7C3E1FAF6ADF2F 93949~|~1~|~1~|~01/NFA~|~Pavement Markings (B) District wide. 100% State ~|~21 - Safety~|~426CD09EF4F8F9FCA1B8EFA9798F9A55CD9049B0 123336~|~1~|~1~|~01/SAF~|~Improve the intersection of SR-32 & Herold Rd. ~|~21 - Safety~|~75193F2E559C79BF056D76C9219E861AB9D45419 122924~|~1~|~1~|~01/NFP~|~Created for J&C Involvement ~|~44 - Other~|~79A4C0BFC83C1058BA4A68EFC5371371985AEDFF 103899~|~1~|~1~|~01/SAE~|~Intersection improvement at SR 39 & Bluebell Drive to include new traffic signal hardware and restriping of the pavement markings.~|~21 - Safety~|~36923E30A84E60FE43B20F501FECA590E0AFD814 121893~|~1~|~1~|~01/NFP~|~Building demolition~|~44 - Other~|~399188F3F8D564B0CAE20F3F22969E5BF8E3FC36 99839~|~1~|~1~|~01/CMQ~|~Intersection improvements at Bell's Lane and SR-32 and Old SR-74 at SR-32. Includes improvements to Bell's Lane and Old SR-74 to accommodate additional turn lanes and receiving lanes. Construction of sidewalk on the east side of Bell's Lane and the north side of Old SR-74.~|~21 - Safety~|~A7F8313691AA4AC26326BCDABAAC7AFD0B19D789 117518~|~1~|~1~|~01/S5K~|~Bridge Renovation & Relocation~|~13 - Bridge Rehabilitation~|~A6A42E79C8F46E44BC1074DE93431EE36548E29B 93106~|~1~|~1~|~01/S<2~|~City of Zanesville resufacing project utilizing STP funds~|~05 - 4R Maintenance - Resurfacing~|~4C588F13C851C2DBA6CF7892FBEA2CE8D6AC64D2 103714~|~1~|~1~|~01/SAF~|~Work items eligible for SRTS funding~|~28 - Facilities for Pedestrians & Bicycles~|~853251D2EE4401B1EFC59F44D663E072CAF7441E 118630~|~1~|~1~|~01/IMS~|~Resurfacing~|~~|~897C055E0C32013BF515EDFBD8C6178DC38A6366 118630~|~1~|~2~|~02/NHS~|~Resurfacing~|~~|~3D5340494A5F95AC723A1ADFF38A85EDC2BE8764 118630~|~1~|~3~|~03/S5K~|~Resurfacing~|~~|~BF3544600BEE478CFEC66B7CEC2F0FE178F65FD0 118630~|~1~|~4~|~04/STR~|~Resurfacing~|~~|~B71D561CADE3AE0454AD9BEBA9D54AA16B0E48C8 106858~|~1~|~1~|~01/ERD~|~Plan split for Ferry Funds~|~26 - Ferry Boats~|~1FF455B4C394C07BB4ED76FF255DE63F9384CA3A 117762~|~1~|~1~|~01/IMS~|~Plan split for pavement - added capacity for the new 4th lane in each direction. ~|~03 - Reconstruction - Added Capacity~|~DC10FF9415092462EFB10185C164E803C29BB43B 125633~|~1~|~1~|~01/S>2~|~Construction Funding~|~13 - Bridge Rehabilitation~|~2CE021221948FE7CF7CAAFC6F1AC664FEFA7A63E 94119~|~1~|~1~|~01/NHS~|~Deck Sealing~|~13 - Bridge Rehabilitation~|~27281A0E327B57550F40F8FC6FD1E8114F9A1620 106284~|~1~|~1~|~01/NFP~|~Pavement markings along various routes in Ashtabula, Mahoning and Trumbull Counties.~|~21 - Safety~|~D352D1601310AD05C23A935C50A272C25821E377 106284~|~1~|~2~|~02/SAF~|~Elongated pavement markings.~|~21 - Safety~|~CB27C02BC6EC4C54CF338526DC32B473BDB7854E 84382~|~1~|~3~|~03/S<2~|~STP 80/20 (Circleville):PIC-56-20.64 to 22.04~|~99 - State Preventative Maintenance~|~1917D97B3E03AA883454A5F626601D1A05924BC0 84382~|~1~|~1~|~01/STR~|~STP Rural locations 80/20:PIC-56-22.04 to 33.93PIC-138-0.00 to 9.13PIC-674-0.00 to 10.93FAI-674-0.00 to 0.40UNI-38-0.11 to 0.30UNI-161-0.63 to 6.12 / 6.31 to 12.16UNI-347-0.00 to 15.23~|~99 - State Preventative Maintenance~|~708768A48E512D942F769E60A53F7A40ACA72E9A 84382~|~1~|~2~|~02/IMS~|~IR Funds 90/10:FRA-71-25.60 to 28.73~|~99 - State Preventative Maintenance~|~8344998EB65A4538804E6F4A026A1FC5168EBF90 91655~|~1~|~2~|~02/NFP~|~100% state split for fiber optic cable purchase.~|~~|~73D53563C7C86B1C0C10DE4CB1661A1AD1C646AF 91655~|~1~|~1~|~01/SAF~|~80% Federal HSIP w/ 20% Local matching funds~|~21 - Safety~|~84B3BE96925BC277E39ED8CD7A2086BB4B0BAFB3 90793~|~1~|~1~|~01/MPO~|~Removal and reconstruction of the existing pavement, curb, walk, adding new street lighting and ADA compliant wheelchair ramps in Dayton from Keowee Street from Hillrose Avenue to Leo Street.~|~21 - Safety~|~B20364B6A81A63F2BC8D6818EC2B55378524297D 98626~|~1~|~1~|~01/NFA/KCEO~|~"01/NFA/BR/KCEO " ? County Engineer?s Association Organization (CEAO) Funding 4B87(80% Federal) / LNTP(20% Local) Eligible to use Credit Bridge (TRC) up to $68,625.00 ? CAP 4B87; $434,625.00-$44,697.00(PE) = $389,928.00 (CO); TRC; $68,625.00-$8,939.40(PE) = $59,685.60 (CO) - Replacement of SFN 4236823 KNO TR135 01.50 Intersect: Vance Creek; Not BR Eligible for Replacement: Length=34 SD/FO(0) SR=49.1 DSR=5~|~10 - Bridge Replacement~|~A021AE8980A3620E00CF6FC9F38B82AC946CA0F7 94396~|~1~|~2~|~02/STR~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~7D9368F83770516E9EF558CB4B07A600DC2D70CA 94396~|~1~|~1~|~01/S<2~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~F5B8E0EBEE9F2730C9C9BF3C93F8DC94A8EFFC1F 92271~|~1~|~1~|~01/STR~|~ Resurfacing of Airborne Road (CR-89) with 2 inches of asphalt pavement from SR-134 to Progress Way.~|~05 - 4R Maintenance - Resurfacing~|~68EE676BDB97E28B9F7EA1943669D65EBB59384B 87195~|~1~|~3~|~03/S<2~|~District Preservation Program budget. SACs 4PF7 and 4PS7. Urban STP. No local funds. Work inside the Kenton Urban Area but outside the City of Kenton. Work on the left side of US 68 from 7.52 to 8.78 and on the right side of US 68 from the Urban Area Boundary to the end of the project at 8.86. 7.10 used for Urban Area Boundary.~|~05 - 4R Maintenance - Resurfacing~|~56CE2730BD7B70CE4A9F5733DFFFA5C98C4AA246 87195~|~1~|~1~|~01/STR~|~District Preservation Program budget. SAC 4PF7 and SAC 4PS7. Rural STP. No local funds. From the county line to the Kenton Urban Area. Used 7.10 which is CR 135 for the Urban Area Boundary.~|~05 - 4R Maintenance - Resurfacing~|~DA2C29F7380034DF7995ED9585A0E802DD405ED8 87195~|~1~|~2~|~02/S<2/KENT~|~Federal funds from the District Preservation Program budget SAC 4PF7. The 20% match is provided by the City of Kenton. Work on the left side of US 68 from 7.10 to 7.52 and 8.77 to 8.86. Part of US 68 which is inside the City of Kenton was outside the Kenton Urban Area after the year 2000 Census. Splits were set up with this area in the Urban Area was added the Urban Area update process in 2012 and 2013. The functional classification maps, and other data, not yet updated to reflect the new Urban Area boundary.~|~05 - 4R Maintenance - Resurfacing~|~DD508E2A9FF75F505861B828A2B5137F54E732F0 118848~|~1~|~1~|~01/STR~|~Resurfacing US 36 from SLM 3.85 to SLM 13.88~|~05 - 4R Maintenance - Resurfacing~|~ED21095F43286E3F89FFB579B6FFB97E2751F04B 118848~|~1~|~2~|~02/S5K~|~Resurfacing US 36 from SLM 13.88 to SLM 15.90~|~05 - 4R Maintenance - Resurfacing~|~EACEC08F52FC4B87F667424ADBE3FDD33300359E 98736~|~1~|~1~|~01/NHS~|~Type C Emergency culvert project~|~04 - Reconstruction - No Added Capacity~|~EEB00AC223E3FF791483B06AA1F7188DF0D592FF 78158~|~1~|~1~|~01/STR~|~Rural resurfacing of MRW-314: 19.97-25.9801/STR/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7DB49F0DC2C4692DDA7094D84D82DBBA88E35318 78158~|~1~|~2~|~02/STR~|~Minor bridge work (asphalt overlay, patching, sealing) on 3 structures:5903394 MRW SR314 20.63 Intersect: Wilcox Run5903424 MRW SR314 20.71 Intersect: Cedar Fork5903459 MRW SR314 25.8 Intersect: Clear Fork - deck overlay02/STR/BR/ (do not use BR funds at this time)~|~13 - Bridge Rehabilitation~|~B5C8616D4B38C8E1E0D3CB1FACF5AB2B18DC7A12 92985~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Kno-SR 205-00.26 to 06.94~|~05 - 4R Maintenance - Resurfacing~|~9B625DDECD53EBCA765585C3B75A7699FD1B066D 92985~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Kno-SR 205-00.00 to 00.26; 2) Kno-SR 514-00.26 to 07.93;~|~05 - 4R Maintenance - Resurfacing~|~FAD303789490AC469493A8CA911F4F5F045CB103 93289~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - Rehabilitation on 3005887 GUE SR513 8.71 Intersect: Sr 513 Over I70; Not BR Eligible for Rehabilitation: Length=295 SD/FO(0) SR=71.1 DSR=5~|~13 - Bridge Rehabilitation~|~CF4CD2D34E8BEC22EB39DD211A079BD94489F173 95524~|~1~|~1~|~01/NHS~|~Remove and replace overlay, rebuild deck edge, clean out joints and reseal. Bridge # CLA-68-0738R, SFN 1202677 Ramp C over the Mad River.~|~~|~F930C59E4F62AE11A4F24FF1929733C21E3AFCE6 123890~|~1~|~1~|~01/NFA~|~Install standard MGS guardrail on several county roads.~|~21 - Safety~|~CE03426F60B2A9CE995D11A1708E26AA2BE18A1D 108091~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridges.~|~13 - Bridge Rehabilitation~|~E2EA8C158A89BAD2F3E70B4FAA6D98F093DD57EB 93865~|~1~|~1~|~01/NFP~|~Construction of Salt Dome facility at Ravenna outpost.~|~44 - Other~|~98B670D6BEBACD524814206ACD50584C5E00FB66 93865~|~1~|~2~|~02/NFP~|~D4 POR Ravenna Salt Construction Support Services~|~01 - New Construction~|~C6039B754AE686BEE68CA047811A31C91D04B7C1 76809~|~1~|~1~|~01/IMS~|~Split for pavement rehabilitation~|~04 - Reconstruction - No Added Capacity~|~41BC292AC572DFC7D03682370647E3164EB36921 93930~|~1~|~1~|~01/NFP~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~1FB9E4FB36CC5B3E1743F4871B4B239E95803216 99547~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5884782A48E12C18D9510E7AA41BC3E2A4379430 123199~|~1~|~1~|~01/STR~|~Repair piers on structure MRW-529-2.46 over Big Run Creek~|~13 - Bridge Rehabilitation~|~C8661E4FB31868FDF26E032ADB9615B0D2AE1616 103878~|~1~|~1~|~01/STR~|~Culvert Replacement.~|~04 - Reconstruction - No Added Capacity~|~9B37A0AC8A8066273B4B29DC27F5DA17E745386B 117989~|~1~|~1~|~01/BRF/MCEO~|~Bridge replacement of MUS TR 420A 0.05 (SFN 6040322)~|~10 - Bridge Replacement~|~71BE2BFAA7401FF629582B9D086EF0EEBF658EF6 88573~|~1~|~1~|~01/STR~|~Pavement planing and resurfacing with asphalt concrete on US 127 from SLM 16.69 to 22.24 SR 47, US 127 from SR 185 SLM 25.30 to the North Corporation Limit of North Star SLM 29.47~|~05 - 4R Maintenance - Resurfacing~|~CAD36E08863A0208478AA69826191D978D46F65E 113580~|~1~|~1~|~01/IMS~|~Interstate bridge painting split~|~47 - Bridge Preventive Maintenance~|~AB73B4DACCA8A3D6AB11443ECCD2F58CFA21F105 113580~|~1~|~2~|~02/NHS~|~NHS bridge painting~|~47 - Bridge Preventive Maintenance~|~A9F4F6C6494B77D5A4D2B05D547E5B5674909725 117779~|~1~|~1~|~01/STR~|~Culvert replacement at two locations on CAR-164.~|~04 - Reconstruction - No Added Capacity~|~AD4951C774CD4FB038995765C54CDC34C95B2EA2 97736~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~D06E780351E6AC5C2C452F9A1C2F7E864B29E312 115792~|~1~|~1~|~01/NHS~|~Widening Alum Creek Drive to 3 lanes in each direction (SR317 to Groveport Road)~|~03 - Reconstruction - Added Capacity~|~B4995C3AF824B93C14F6CE1BBCED99AB82F7FBD4 115792~|~2~|~2~|~02/BRO~|~Major Rehab/Widening of Alum Creek Drive including replacement of bridges over Big Walnut Creek.~|~10 - Bridge Replacement~|~7B853BCA528740686AB59DD971E65F224BCA1365 105692~|~1~|~1~|~01/STR~|~Herbicidal spraying along 2 lanes.~|~44 - Other~|~33FEBA71D73B33404ACF638D5063CAABA64C2CDD 126751~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding.~|~44 - Other~|~5F564F77BF1FFC573A8D1121744F66E757C4DAD1 125453~|~1~|~1~|~01/ENH~|~Construct noise wall adjacent to IR 70 ~|~20 - Environmental Only~|~B308BE22B688290FCD81598557A721D0BE77EB11 21085~|~1~|~1~|~01/BRO~|~BRIDGE REPLACEMENT PROJECT. GAL 7 1291 (SFN 2700301). 80% Federal and 20% State.~|~10 - Bridge Replacement~|~87EEB722CCE44F6F3177AC67FBFE6BCBB862C607 117972~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 550 14.30. Funded 80/20 GSM.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2FB14889A04EA5813942C8062491F03D66A34B9E 88337~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~7D2A6E4468C2C4ED797D4DDEE08A86BE90FB0C8C 95938~|~1~|~1~|~01/NFA~|~Austintown Local School District~|~44 - Other~|~5A6E6FD59EB5A1330DCE6AE9A46F7AD2BB454CA9 101400~|~1~|~1~|~01/STR~|~STP Rural AC Overlay with RepairWAY-83-0.00 to 7.54~|~05 - 4R Maintenance - Resurfacing~|~2A347623538E2FF88775ED087E9A1A2F28342A21 101400~|~1~|~2~|~02/S<2~|~STP < 200000 AC Overlay with RepairWAY-83-7.54 to 7.83WAY-83-7.83 to 8.09 (South Bound)~|~05 - 4R Maintenance - Resurfacing~|~23C0007C0B654A26DABEB040C75D2367147AA16F 101400~|~1~|~3~|~03/STR~|~Specific Bridge Work in Work Locations:WAY-83-0.00 to 6.94~|~13 - Bridge Rehabilitation~|~D543BD7E80131BC7DDCF6475CD203C388041EEDF 101400~|~1~|~4~|~04/S<2~|~City of Wooster - 80/20 Fed/City. SLM 7.83 to 8.09 Split CorpWAY-83-7.83 to 8.09 (North Bound)~|~05 - 4R Maintenance - Resurfacing~|~91364C93C7FAA0512999BCBEA37E62CEAE5A9251 101400~|~1~|~5~|~05/S<2~|~100% City of Wooster Cost. SLM 7.83 to 8.09 Split Corp.WAY-83-7.83 to 8.09 (North Bound)~|~05 - 4R Maintenance - Resurfacing~|~0912B6C25B55B5C5E1DCC43517D3192325DAE26D 97170~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 564 0.02, SFN 6104118. Not on the federal aid system funded 100% state.~|~10 - Bridge Replacement~|~E9859FC5E6F789E58B5B483FB150241B42D03A00 88604~|~1~|~1~|~01/STR~|~Rehabilitate 656 bridge over Big Walnut Creek. SFN 2103966 - DEL 656-1.72Deck overlay on 521 over Alum Creek. SFN 2103516 - DEL-521-6.83~|~13 - Bridge Rehabilitation~|~08F3A46476CBE3CC4CB609C41B105A5EF998F334 107389~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Task order for construction inspection - 60% Federal (4PF7)/40% State (4PS7)~|~17 - Construction Engineering~|~1824EDAB868F4CB2BB3CEE8965C502C3E9DFE0D6 94635~|~1~|~1~|~01/MPO/LaPA~|~Construct a new Access Road From CR1 to the Gusiness District.~|~01 - New Construction~|~702ACFC3371452D39602EDABEB0B397139A98388 97595~|~1~|~1~|~01/STR~|~01/STR/OT ; Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) program.~|~44 - Other~|~F60E59426872C109FC7F843E605E30D2E238D6CE 94584~|~1~|~2~|~02/NHS~|~Remove superstructure SFN 4600215 LOG US 33 6.410 (NP 798)~|~13 - Bridge Rehabilitation~|~77AC98DDB9133C6E7B6150845126755CE70D0221 94584~|~1~|~1~|~01/S<2~|~Installation of guardrail along the south side of SR 368 and connect to existing guardrail. SR 365 from SLM 2.08 to SLM 2.13~|~44 - Other~|~A21FABD25C6BA4FF00707FF0D8176DC0103C3883 100835~|~1~|~1~|~01/IMS~|~Bridge Maintenance in Interstate bridges.~|~47 - Bridge Preventive Maintenance~|~387F7A2EB1A351C7B73A3658D4DF21047AFA99B0 100835~|~1~|~2~|~02/S>2~|~Bridge maintenance on large urban bridge.~|~47 - Bridge Preventive Maintenance~|~04424F4BD50A4A92740EA80F8992F45D1CDD5DCF 100835~|~1~|~3~|~03/STR~|~Bridge maintenance on rural route bridge.~|~47 - Bridge Preventive Maintenance~|~5B34BD6BDD74A4AFF2ABC605B9A4BB61907D327B 100835~|~1~|~4~|~04/NHS~|~Bridge maintenance on NHS route bridge.~|~47 - Bridge Preventive Maintenance~|~1F51B723873743351B5875B5274390C09C630DB4 100835~|~1~|~5~|~05/SAF~|~Upgrade outside barrier on HAM-50-2198N to 57"~|~21 - Safety~|~1701F5E768C33697F60D272C11756B85EA8F0BE6 108904~|~1~|~1~|~01/S<2~|~Sidewalk project within the City of Hillsboro~|~44 - Other~|~D711CD6314EDB2B0FF666D8492AD950D54F0F428 124295~|~1~|~1~|~01/BRO~|~Repair railing on bridge carrying SR 152 over Piney Fork Creek.~|~13 - Bridge Rehabilitation~|~4914BA5403CD8733DB09791605911B06DA7EFE98 110132~|~1~|~1~|~01/STR~|~DEL47, MAD38, MAD665-3.29 to 3.35, MAR37, MAR95, MAR203, MRW19, MRW 314, UNI37 and UNI47~|~17 - Construction Engineering~|~5ED1534302D73A3212E5F7C4583C5C83B5BBFA39 110132~|~1~|~2~|~02/S<2~|~MAD-665-2.47 to 3.29~|~05 - 4R Maintenance - Resurfacing~|~376944FB426978221C35E0B5E3E9E018D93B8EA0 110132~|~1~|~3~|~03/NFP~|~FAY-753~|~05 - 4R Maintenance - Resurfacing~|~250AA771B390249D17E638091AF1E28F0AB88822 92464~|~1~|~1~|~01/IMS~|~8703248 WOO IR75 7.03 Intersect: Tr 55 Bays Road 8703272 WOO IR75 7.03 Intersect: Tr 55 Bays Road 8703302 WOO IR75 7.2 Intersect: Csx 8703337 WOO IR75 7.2 Intersect: Csx~|~~|~F811AE142B64E8882A9E48CBA67C5792DDD02F70 125597~|~1~|~1~|~01/S50~|~Upgrade warranted signal and improve pedestrian crossings at the intersection of SR 101 and SR 269 (North).~|~28 - Facilities for Pedestrians & Bicycles~|~1C2380C09B0EB88B32FFC9892D5D05B4DCA56811 112914~|~1~|~2~|~02/SAF~|~Pedestrian crossing improvements in the Village of Ashley.~|~21 - Safety~|~D5905B253E1E042385DCED3486B83556CB823BD5 112914~|~1~|~1~|~01/STR~|~Paving SR-229 in Delaware County~|~05 - 4R Maintenance - Resurfacing~|~E3D54A456FF375DAE785E59E19E0AB4680ED4A07 110905~|~1~|~1~|~01/NFA~|~Entering for TID involvement~|~~|~894399B25FC4A167B18D364166AB39E94EE65300 127077~|~1~|~1~|~01/NFP~|~Plan Split for sign repair, installation and maintenance contract.~|~21 - Safety~|~F3A7FA57A5F1D7F308E9E4AD38D035CAA55DBAE5 106826~|~1~|~1~|~01/MPO~|~Intersection work for adding a left-turn lane that qualifies for federal-aid~|~21 - Safety~|~7C3EC16E7183C775EA690CA344C12359EAD089A7 98007~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~688203F8B6DB944B170992D2B9EFD77D195FD07A 103237~|~1~|~1~|~01/NFA~|~TID is constructing the Innovation Way Widening Project including, but not limited to , roadwork improvements by removing existing curb and gutter, constructing additional northbound and southbound lanes to provide two 11' lanes in each direction, installing new cubs and gutters and resurfacing existing roadway pavement.~|~01 - New Construction~|~034B353F7606ED3CBAF9438438B39153FBF3E71A 126405~|~1~|~1~|~01/S5K~|~Plan split for the items that are Urban Paving eligible; 80/20 split between ODOT and the City. ~|~05 - 4R Maintenance - Resurfacing~|~642B343166B4CCCECC4677E7DB77BD73D221092C 126405~|~1~|~2~|~02/S5K~|~Plan Split for the 100% City funded items. ~|~05 - 4R Maintenance - Resurfacing~|~9FACFD0BCF337ED26B89551B16B30F42B5F28A77 123576~|~1~|~1~|~01/IMS~|~resurfacing on a portion of HAM-71~|~05 - 4R Maintenance - Resurfacing~|~58D6DE64676067B09E83DE17860A017045399E9D 126056~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~5630FC15D010ACDF6A16F0A2076D5E9BDEC063DD 105386~|~1~|~1~|~01/STR~|~Smooth seal on rural route: MER SR 118 SLM 0.00 to 3.91~|~05 - 4R Maintenance - Resurfacing~|~9808DB8C3EDA26EEF0EB60AC008B26D49D6BE26E 113893~|~1~|~1~|~01/NFA~|~Created for J&C involvment~|~44 - Other~|~C5A90289A8BDDCAD7EFB71F73D3705CFE3277348 108099~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridges.~|~13 - Bridge Rehabilitation~|~9E0FB879CF688163AA1C5DF9CF85BC3863C7CD58 108099~|~1~|~2~|~02/S<2~|~Bridge rehab on small urban route bridge.~|~13 - Bridge Rehabilitation~|~B566DC4EE225EAABC66F7673A9686A6878CC6473 108099~|~1~|~3~|~03/IMS~|~Bridge rehab on interstate route bridges.~|~13 - Bridge Rehabilitation~|~A36ED854C881EA756B002A687B1F13EC5FC22D95 109903~|~1~|~2~|~02/NFP/ODOT~|~All work to pave at the ODOT Hancock County Garage.~|~05 - 4R Maintenance - Resurfacing~|~ABE2C82385C79ED2E341367BE0CA53946BEB5DB9 109903~|~1~|~1~|~01/NFP/ODNR~|~All work in the project to resurface at the ODNR Findlay office.~|~44 - Other~|~ED94BA1025A370849D19EFFA86ADB2E6441448E7 113200~|~1~|~1~|~01/NFP~|~All work in this project. State funds from the Safety Program. After the Safety funds cap is reached funding will be state funds from the District Preservation Program budget.~|~21 - Safety~|~6CF5C38E849A3E67AFC2BB9FEA13450D131EEA0A 107375~|~1~|~1~|~01/IMS~|~Major Rehab IR 75 SLM 6.86 to 9.57~|~04 - Reconstruction - No Added Capacity~|~C11A981DC4AB59F704CB09F4FCB15173D6D98487 107375~|~2~|~2~|~02/IMS~|~Bridge Repair - Major Rehab IR 75 SLM 6.86 to 9.57~|~47 - Bridge Preventive Maintenance~|~0DCE1F36F6B800CC847EDD31A647383F626C243B 107375~|~3~|~3~|~03/IMS~|~Paving / Mill and fill on the north end~|~05 - 4R Maintenance - Resurfacing~|~1273A8F6392DE988A116C6744A127578027154A4 107375~|~4~|~4~|~04/IMS~|~Barrier wall repair, lighting repair, & signs.~|~21 - Safety~|~12BD255118D8CE126019DC2C469BB7CD66359AB0 107375~|~1~|~5~|~05/IMS~|~For numerous accidents to permanent work items ~|~13 - Bridge Rehabilitation~|~81F632D42FDE34B1D31588A2A230D564537F0EB7 114381~|~1~|~1~|~01/MPO~|~Improvements to the existing intersection of Liberty Way with Cox Road.~|~21 - Safety~|~1529A0A285F94192B12FA9CA73B6C7D60E128F6D 92829~|~1~|~1~|~01/IMS~|~Bridge decks, approach slabs and top of abutment backwalls being overlayed with micro-silica conrete, minimal to no approach work. Repair of cross frames, resetting of bearings, and shimming of loose bearings on SFN 5705843 MOT 70 1441, SFN 5705835 MOT 70 1439, and SFN 5705436 MOT 70 0962 (Union Road)~|~13 - Bridge Rehabilitation~|~9D3E19229E9167671E2B10D22B79D5016D39D693 97602~|~1~|~2~|~02/NFP~|~Signal work that is 100% City participation~|~44 - Other~|~5D6DAC4AE96733320D1A8E22FD2DF3AD1A30444E 97602~|~1~|~1~|~01/MPO~|~Signal work that is eligible for CMAQ funding~|~21 - Safety~|~4CB3FF9291309154AD3774E5C5D506CA4CB11A76 118577~|~1~|~1~|~01/STR~|~Plan Split 01/STR/OT~|~21 - Safety~|~3B50BED7A7A46B057E80D09A1E043ACE0AF4DAB4 102374~|~1~|~1~|~01/NHS~|~This project is to upgrade the traffic signs along US 22 in Harrison and Jefferson counties.~|~21 - Safety~|~FE87EAAF8FCA12E73F3D8F9B3A1FB13594A69E8B 105468~|~1~|~1~|~01/STR~|~STP Rural Plan Split - FAY-729-4.56 to 4.87~|~~|~DB688BCC1F6EA5BB5F31F2559CD268ECB726EB13 105468~|~1~|~2~|~02/NFP~|~FAY-734 from 7.18 to 12.56~|~~|~2AA2684CF1397501868D4D248BD93DE4C0D5180A 94013~|~1~|~3~|~03/S>2~|~Microsurfacing.~|~~|~64C7EAC0D45F46557F3D7962BA011181772C1064 94013~|~1~|~1~|~01/IMS~|~Double microsurfacing.~|~~|~5D723B39F273BA99073917941AEFF38A15A12099 94013~|~1~|~2~|~02/NHS~|~Single and double Microsurfacing.~|~~|~48335CBFA354F5767B07166E5F348A55CB8DB520 94013~|~1~|~4~|~04/STR~|~Microsurfacing.~|~~|~AB890C61CFBC396AFFDF305E9C38BCB6C4B84A5C 105907~|~1~|~1~|~01/NHS~|~Plan split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~5D1572465DEBE34840F0DA6F09FB411FEAABE238 105907~|~1~|~2~|~02/NFP~|~Split 2 for non-federal work items.~|~05 - 4R Maintenance - Resurfacing~|~AFBC6483A68899BC4446C85F550A591377D4771B 93957~|~1~|~3~|~03/NFP~|~For all work items not eligible for Urban Pav.~|~05 - 4R Maintenance - Resurfacing~|~6DFCB20F56C09EB34BAF1C36DC9533B57F76B085 93957~|~1~|~1~|~01/NHS~|~Urban Paving from SLM 0.38 to 0.91~|~05 - 4R Maintenance - Resurfacing~|~BFDF8ADA1264764C827CE593727DBA89DF49FDB3 93957~|~1~|~4~|~04/SAE~|~This split is for the safety project on SR-2 at SLM 15.24 and SLM 19.99.~|~05 - 4R Maintenance - Resurfacing~|~DD2643581E4938669B160442211D710ADE1D8692 93957~|~1~|~2~|~02/S>2~|~Urban Paving from 0.00 to 0.38 and then from 0.91 to 1.79.~|~05 - 4R Maintenance - Resurfacing~|~DDA46B7782C47EF89BB272FF6623B7944475BD0C 95732~|~1~|~1~|~01/S>2~|~On Burt Street from Sheridan to Kenton. On Bechtle Avenue from North to IORY. On Lagonda to Columbia to Main.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D671259A2DD44E67E9F659F1ED4BAA0D8D62518D 105215~|~1~|~2~|~02/NHS~|~plan split for roadway work in the NHS portion:HAM-32: SLM 1.3-1.53HAM-125: SLM 1.53-1.87~|~05 - 4R Maintenance - Resurfacing~|~2BC16FB3FD815448FAAACBA9DB68BAF5081FF360 105215~|~1~|~3~|~03/SAF~|~Install RRFB and crosswalk markings at SR-32 & Turpin Lake Pl.~|~21 - Safety~|~985F31F9B432B49F338E696DE77D57415977A49E 105215~|~1~|~1~|~01/S>2~|~plan split for the roadway work in the large urban portion:HAM-32: SLM 1.79-4.58Also includes the ramps~|~05 - 4R Maintenance - Resurfacing~|~5CC0C1061FC6ADE66D9413567881505582753827 105215~|~1~|~4~|~04/NHS~|~Plan Split for bridge work on HAM-125-0169 including patching and deck sealing.~|~47 - Bridge Preventive Maintenance~|~FC0C505C8493BB48025E71F7C98B335B3CC78770 105215~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustments~|~47 - Bridge Preventive Maintenance~|~6BEEC4502264EF677F0F91A9E7C0F7E62969822E 98789~|~1~|~1~|~01/SAF~|~Installation of a two-way left turn lane, modification to the vertical profile south of Moselle Drive, widening of the paved shoulder to 5 feet, and installation of lighting at all intersections between Princeton Road and Millikin Road on Liberty Fairfield Road (CR-113).~|~21 - Safety~|~1C40B238553A224D629619ECB4999F502CBF2789 98789~|~1~|~2~|~02/SAF~|~Plan split for 100% local utility work being performed as part of this project.~|~43 - Utilities~|~D7633123B93F6E14E3123ED964F4093F584587C5 91908~|~1~|~1~|~01/NHS~|~Crack sealing on US 33~|~05 - 4R Maintenance - Resurfacing~|~F92FFFE36432C4CA476FC62EC00DFFDA5C5DC9EE 89458~|~1~|~3~|~03/IMS~|~Total reconstruction of existing 4 lane portion of SFN 7709390 SUM IR 271 12.62 L and SFN 7709420 SUM IR 271 12.62 R over SR 82 and SFN 7709544 SUM IR 271 1413 R and SFN 7709455 SUM IR 271 1413 L over Norfold Souther RR and Ledge Road~|~10 - Bridge Replacement~|~4E5F83EC422F305B0031CA794E1D668A3847C0A1 92377~|~1~|~1~|~01/NFA~|~Replace existing mix building with a 40' X 40' salt storage building at the Cassela Outpost located 0.25 mi. W of US 127 on SR 119. An asphalt pad will be constructed by ODOT. Replace the existing mix building with a 40' X 40' salt storage building at the Mercer Outpost located at the intersection of SR 707. An asphalt pad will be constructed by ODOT.~|~44 - Other~|~77384CF2CED4B52EEE13E80B1F5185F387257878 92377~|~1~|~2~|~02/NFA~|~Reference original encumbrance 580991. Replace existing mix bldg. with a salt storage bldg. at the Cassela Outpost and replace the existing mix bldg. with a salt storage bldg. at the Mercer Outpost. Asphalt pads will be constructed by ODOT at both sites.~|~44 - Other~|~BF63C70871182B90033D117E65AF9B0168DE36C8 24855~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds for this project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7804376DBBCB7B1DE459FBCFB9C84D37DAFBBF2F 119796~|~1~|~1~|~01/SAF~|~All work included in this split.~|~21 - Safety~|~3F54FC7BBA84912191B5289FB804EC2BECDD58A5 106830~|~1~|~1~|~01/NHS~|~Work at the DEL-23/Home Rd and FRA-161/3 intersections~|~21 - Safety~|~937D896106EE85B7CFF32158D410FA9A3F507830 106830~|~1~|~2~|~02/S>2~|~Work at the DEL-257 at Home Rd and DEL-750 at 257/Glick Rd intersections~|~21 - Safety~|~FE6366FE730CCF972B2D308A62C76285E398CA7C 113907~|~1~|~2~|~02/NFP~|~City funded water line work and any ineligible items, all 100% City.~|~43 - Utilities~|~BF36816F835A844C0D2A27055BE572BE9F630720 113907~|~1~|~3~|~03/ENH~|~Includes all "enhancement" work that is funded through TAP funding. This includes work for all sidewalks and/or multi use trails as well as any work that is directly tied to construction of these features (such as grading or drainage work).~|~28 - Facilities for Pedestrians & Bicycles~|~E44A726AA809008B6E31E8C5F21BE6F20987356B 113907~|~1~|~1~|~01/S<2~|~Roadway Reconstruction with Curb and Gutter. Funding is 95% federal funds from the Small City program until the cap is reached then the funding will be 100% local funds provided by the City of Van Wert.~|~04 - Reconstruction - No Added Capacity~|~50DBC56AEE9CCB869CB937CED6130B781BCE2279 115825~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~10 - Bridge Replacement~|~612F3A45B1C1EEA096A73C7F0062CC679CCDE805 120765~|~1~|~1~|~01/SAF~|~Pedestrian Improvements~|~21 - Safety~|~7867642942A01DEAF033A7E3D3698A65ABE7AB67 100347~|~1~|~1~|~01/STR~|~Microsurface various routes in Mercer & Shelby County MER SR 119 12.89 - 17.02 MER SR 274 4.35 - 6.14 SHE SR 29 0.00 - 2.98 SHE SR 29 7.64 - 14.47 SHE SR 119 4.46 - 8.22~|~05 - 4R Maintenance - Resurfacing~|~B15DA78ED753496CDA62DBB515570C6D87F5C427 100347~|~1~|~2~|~02/S<2~|~Microsurface SHE SR 29 14.47 - 14.56~|~05 - 4R Maintenance - Resurfacing~|~42D0251AFB4612DF5479448B626B13FAD56C7566 89158~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - County Engineer's Association Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP = CEAO $817,190.00 Federal dollars with Credit Bridge CAP of $129,030.00 for 15% match - Replacement of 4538102 LIC TR232 0 Intersect: Panhandle Railroad; BR Eligible for Replacement: Length=90 SD/FO(1) SR=22.6 DSR=5~|~10 - Bridge Replacement~|~ADA477DA64D652E047D1006CFDCB4DFCD9485296 125017~|~1~|~1~|~01/NFA~|~ODNR project to resurface, crack seal & chip seal Lake Loramie State Park~|~05 - 4R Maintenance - Resurfacing~|~F9E3224BEF7A3A0ACDA2794D8B2014B3FAC3D12C 126413~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs MED-301-2.613 to 6.918~|~05 - 4R Maintenance - Resurfacing~|~55A70E62EDDB857DCBD57B916BFD51A3AB3C8673 126413~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs ASD-224-10.172 to 13.713~|~05 - 4R Maintenance - Resurfacing~|~939EB16A16DDB6BDF33A1C3F83D4D4CE51A2C854 96502~|~1~|~1~|~01/ENH~|~Construct a sidewalk along Jacksonville Road from the Sunday Creek Bridge to Trimble Elementary using Safe Routes to School funds. Upgrade school zone signs. Funded 100% federal.~|~28 - Facilities for Pedestrians & Bicycles~|~D2EE2A8E65442CB167BD3036B8EB5E1BD8B7FFA8 108173~|~1~|~1~|~01/NFA~|~Resurfacing Wildwood Lane~|~05 - 4R Maintenance - Resurfacing~|~D543EAE579AD1AB482BF5DAAC744E5CCC6423358 109589~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) -No CAP - Replacement of guardrail along selected OFAH-Rural routes in District 5.~|~21 - Safety~|~6F4AD58300BE8B7143BAAC1C358A5267DD27CA4A 109589~|~1~|~2~|~02/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) -No CAP - Replacement of guardrail along selected OFAH-Urban routes in District 5.~|~21 - Safety~|~001207813D16B4668BA6E6C99D85DA0207B2504B 109589~|~1~|~3~|~03/NFA~|~District Preservation Funding - 4PS7 (100% State) -No CAP - Replacement of guardrail along selected NOFAS-Rural routes in District 5.~|~21 - Safety~|~DD38E2199853F84D9A9759DC6053714D7EC5E706 109589~|~1~|~4~|~04/SAF~|~Safety Cable Barrier Funding - 4HJ7 (100% Federal) -See CAP Comments - Installation of guardrail along selected portions of FAI-US 33~|~21 - Safety~|~DF34D3D34846C0DEEC174B81A8EE576C75369D52 114929~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DB54C84B881474DF4A3BB4C7B1F0F15556398731 114929~|~1~|~2~|~02/NHS~|~Bridge Maintenance~|~05 - 4R Maintenance - Resurfacing~|~18BBBCD6716B38E7DEF6B497D5047DC50D9BC947 92862~|~1~|~1~|~01/STR~|~Plan split to cover ODOT funded seawall and related items~|~44 - Other~|~6830628DD8A0081C3D53366E99643692BD2246A0 92862~|~1~|~2~|~02/STR/Marb~|~Plan split to cover culvert and related items paid as 100% Village of Marblehead~|~44 - Other~|~FD795E34931C8D060C7932F86B351F9946FC9D30 103274~|~1~|~1~|~01/NFP~|~Sign replacements on various 2 lane routes throughout ATB and TRU counties.~|~21 - Safety~|~ED5D20C317A52A9DEF19869CCB7156673E521FB7 118830~|~1~|~1~|~01/SAF~|~MEG-County Route Various Pavement Markings -FY24~|~21 - Safety~|~8817A42DD52DCFB1412D4D8E7DFA1938AD6CAE88 125375~|~1~|~1~|~01/SAF~|~Sign replacement.~|~21 - Safety~|~D6CFA08E656190C577A800ECBAA3FFDA43632DCB 108252~|~1~|~1~|~01/IMS~|~Disaster Relief Funds - 4BY7 (Federal 100%) - See CAP Comments - Repair of the slope above the Interstate Gue IR 70-19.65~|~21 - Safety~|~FDF68091AE40A6C2C2E017E5D1CD123A977306CF 107862~|~1~|~1~|~01/STR~|~ADA 136 18.96 & BRO 62 26.50 turn lane addition.~|~04 - Reconstruction - No Added Capacity~|~08819A1DDB393A2C3577D8F54764A3F9CDE07182 107862~|~1~|~2~|~02/STR~|~ADA 136 (19.18-20.04)~|~05 - 4R Maintenance - Resurfacing~|~4D851A6A736A0B6E4256B9363C0ECB6439B81650 107862~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment ~|~05 - 4R Maintenance - Resurfacing~|~DB4218AB9C593B5E47CF63DCE3529207AFA38ADE 118156~|~1~|~1~|~01/SAF~|~NB off ramp improvements~|~21 - Safety~|~3E3634351E3CEEB7957DF14578ADE197C2D85F50 118156~|~1~|~2~|~02/SAF~|~Replace traffic signals~|~21 - Safety~|~3347047BB97CC95A30E6F7CC73F343B824496E33 118156~|~1~|~3~|~03/SAF~|~Add sidewalks and modify westbound right turn lane at Troy Town~|~21 - Safety~|~D2B488F8AF7345EEAA47063465625179C468F934 107602~|~1~|~1~|~01/S>2~|~Resurfacing on BUT-747. Includes Bridge BUT-747-0237. ~|~05 - 4R Maintenance - Resurfacing~|~731181EAF5BEF51402E726F2F9A93911112850C7 103800~|~1~|~1~|~01/NFA~|~The City is extending and improving Ambrose Dr. and Colleta's Way about 750 feet to provide access to the new Evanston Recycling Solutions Site. The new road will allow for a more efficient and safer access to the facility for employees and trucks.~|~01 - New Construction~|~4681E6D1A1F7BD0702D895B7088F36D744889D13 115171~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr HUR US 20 01.23 TO 07.35~|~05 - 4R Maintenance - Resurfacing~|~023E107D2A55B7228D3929DF787E1D0E63243905 115171~|~1~|~2~|~02/NHS~|~Bridge Work to be Determined at a Later Date.~|~13 - Bridge Rehabilitation~|~CBFBA58995C1CEFF3B543AECD4AF4BC99B660394 116781~|~1~|~1~|~01/STR~|~Lighting Maintenance~|~21 - Safety~|~1812259FAF5B749EE5A6DD1A51FF0F157B57146B 108346~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract at various locations~|~44 - Other~|~7C737B0682A0C007EBD60B9DAE53992E2852D7FE 108346~|~1~|~2~|~02/SAF~|~GR work along SR-229 adjacent to the Delaware Wildlife Area~|~44 - Other~|~C86C22F6A93616BD81758E2A74CD743ED9B330D4 111507~|~1~|~1~|~01/NHS~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE4C7A321268408C260D57A722443338921764D8 102335~|~1~|~1~|~01/STR~|~Multiple culvert replacement.~|~~|~FB808DC31D183C27F40E2BB938296E1415E832FC 112147~|~1~|~1~|~01/S<2~|~LAW- City of Ironton- 3rd Street Reconstruction~|~05 - 4R Maintenance - Resurfacing~|~7A7EF825F24779BB68ABC6F12BB1B56A947BB415 112147~|~1~|~2~|~02/S<2~|~Water line replacement along 3rd Street.~|~43 - Utilities~|~838DA94992BBD2C413F2B1EF3C00F02F4FC066E9 121011~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~525971D2AC6BDE78B3AA29B00B3FE4AD75F8A934 119106~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F2417958DA307D47FDFDE9C30914FD43D0C06541 119106~|~1~|~3~|~03/SAF/MINE~|~Installing mid-block crosswalk with RRFBs in the Village of Minerva.~|~21 - Safety~|~426DA7D74DE4AD7FFA7AB8DC53D55F0E151AF58E 119106~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2A02C3BD7E5E17956C3F76082DF3C3FFAEE951FC 119106~|~1~|~6~|~06/NHS~|~Bridge hit repairs.~|~13 - Bridge Rehabilitation~|~DB497FA4BF73EBDB2840A3B5A1A05EF89A5015C8 119106~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~F9C7F496F74D25D7680CA699E75BAB22B968C13D 119106~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~5FC2B2CB137A5D724745653B7C1AC6FBF0854B34 119106~|~1~|~7~|~07/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~61594FEBE8AA6064B6693B52CDDA5C99ECBF0F84 119106~|~2~|~9~|~09/SAF~|~New signal at US30 & Raff Rd and new overhead sign assembly.~|~21 - Safety~|~F8D6D56BF866659F14BE3E3D77987CC7D1EEA3BD 119106~|~1~|~8~|~08/IMS~|~Bridge hit repairs.~|~13 - Bridge Rehabilitation~|~E7224E7B609457D3241C2997DDB1C98CEB739792 119200~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~0AF794A10090FBE28D6AA1DE7166FC31C2570139 114528~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~A44CE543BF79F390253AE795DAD54BE1D3E18DD1 108975~|~1~|~1~|~01/ENH~|~All work in this project. Funding is 95% federal TAP funds with the use of Toll Revenue Credit. After the TAP fund are used MPO-STP funds will be used at an 100% federal rate with the use of Toll Revenue Credit. The local match and funds needed after the cap is reached will be provided by the Village of Beaverdam.~|~28 - Facilities for Pedestrians & Bicycles~|~B7559CB88117544AAAAB3E27E625BD03E9A2B4A1 116792~|~1~|~1~|~01/S>2~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~DE2396C24624D57ACD62AF16AD8DF80B88D0F7F8 120295~|~1~|~1~|~01/SAE~|~Ramp work at IR 090 and West Blvd for median and splitter island work~|~21 - Safety~|~E37D822A65C054AE6A3EBFCE921AAF9139B5F906 118863~|~1~|~1~|~01/STR~|~SR 46 from East Palestine to SLM 4.09~|~05 - 4R Maintenance - Resurfacing~|~1A60A3C2A038BC92B2FECB0DA58F8C33C6511092 118863~|~1~|~2~|~02/S5K~|~SR 46 from SLM 4.09 to SR 7~|~05 - 4R Maintenance - Resurfacing~|~CAD6492BEE95163F866DDDBDE36B269D3B772231 113793~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" - replacement of structure (FAI CR 55 3.32, SFN 2337258).~|~10 - Bridge Replacement~|~54A4E6B7A9F5F24E9AC13FF1F15691C031C61547 125415~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 681 18.25, CFN 1814413; MEG 681 18.61, CFN 1859869.~|~04 - Reconstruction - No Added Capacity~|~15FF0F24BCA978FCAE3D7111491AD9D8DEF7CE10 91922~|~1~|~1~|~01/NFA~|~D09 ODNR 3 ProjectsIn Shawnee State Forest it is proposed to repair/replace 43 culverts on Forest Road #1, 66 culverts on Forest Road #2, and 3 culverts on Forest Road #16. The work ranges from placing headwalls at the inlet, replacing some deteriorated corrugated metal pipes, and perhaps placing rock channel protection at the outlets of some of the pipes. Also, the project would require the application of a concrete facing on the abutments and wingwalls on the SCI-2SF-0034 structure and the replacement of the SCI-2SF-1054 structure with a concrete box ($168,000). On Scioto Trail, replace 40 culverts, full depth pavement repairs and 3.7 miles of chip & seal on Forest Roads #2,3, & 4 ($347,200.00). 01/NFA/OT/State~|~44 - Other~|~7F77E0201346C0BA8DFC2975FA85ADEB1E7566D9 119550~|~1~|~1~|~01/S>2~|~Pedestrian Improvements~|~21 - Safety~|~5A3FB0684C5BC3C4FFFA3E0F2F76EED2B15F8DBC 98663~|~1~|~1~|~01/IMS~|~Split for work on the interstates~|~44 - Other~|~9B413FE008E00DC74A086BE5DE279515C020A155 98663~|~1~|~2~|~02/NHS~|~Split for work on the NHS route~|~~|~E92694B43F8ECEFE2BC2A989D75EEA3C7E360F38 117811~|~1~|~1~|~01/NFP/SCMP~|~Milling and resurfacing park driveway and parking lots.~|~28 - Facilities for Pedestrians & Bicycles~|~4F47E7264584E15F737A58A927E994F6CFE59DC0 87688~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~99 - State Preventative Maintenance~|~BDCD1DA2A81314EF85AFAC3517FF92ABA35939AE 102995~|~1~|~1~|~01/STR~|~Bridge deck replacement for VIN 677 3.47 (SFN 8203393). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~ED97FB86E77BDC78FD8317FB695CC3238143AFC9 81254~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - District Preservation Culverts 4CW7(90% Federal) / 4CV7(10% State) - No CAP - Culvert lining of culvert under SFN 3001628 GUE IR70 13.34 Intersect: I-70 Under TR 55:~|~44 - Other~|~1A36908CA6D41F06194A0B4C17513E840F01F9DC 81254~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Culvert lining of 1) 3001598 GUE IR70 13.21 Intersect: I-70 Over Ditch: Not BR Eligible: Length=17 SD/FO(1) SR=52.9 DSR=" "~|~13 - Bridge Rehabilitation~|~CA37C166034162C0FD8ACC07ED80B496DB0749FA 117466~|~1~|~1~|~01/BRF~|~Bridge replacement (SFN 4931165)~|~10 - Bridge Replacement~|~37DC44ECF2429DA5CFC23219D7B7167F6116A1C4 99628~|~1~|~1~|~01/STR~|~Split for all resurfacing work at 80% federal and 20% state.~|~05 - 4R Maintenance - Resurfacing~|~8CEE5B590FD387654CB41EF024CE1B1532275F7C 99628~|~1~|~2~|~02/SAE~|~Safety Rumble Striping~|~21 - Safety~|~E993768BDC748AB42A1397BBA7262BD04EB3C9A2 113042~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~FF3637886B8FA8E0AE032B46DA36CC71E1A4FF48 113062~|~1~|~1~|~01/NHS~|~All work in this split.~|~17 - Construction Engineering~|~782EBA9FED5C6A8BA666969AE2089E65F0E23C30 104249~|~1~|~1~|~01/SAF~|~The city will install a signal at the intersection of Chevrolet Blvd and Gabriella Drive~|~21 - Safety~|~5F334296A3F84E256CD1E8F00F10473E94817731 123981~|~1~|~1~|~01/ERD~|~Plan split for construction of shared use path utilizing RAISE grants and MPO TA funding~|~28 - Facilities for Pedestrians & Bicycles~|~2F9D49C9736426D8E17276AFF6438108E1835F99 88526~|~1~|~1~|~01/NFP~|~Add sidewalks for safe routes to school. Porter Ave. SRTS, Phase II~|~28 - Facilities for Pedestrians & Bicycles~|~6739AA40BD6FBCD18049C87B4BBE83CAB7E8EE1E 92497~|~1~|~1~|~01/BRF~|~4830768 LUC C0001 0.05 MI. N. OF SYLV-METIntersect: TENMILE CREEK 0001~|~10 - Bridge Replacement~|~140EABA46E04837074726E564C6B3FB9B863F7EF 113317~|~1~|~1~|~01/MPO~|~TLCI Implementation eligible work for the City of North Royalton.~|~28 - Facilities for Pedestrians & Bicycles~|~7B36555F32ED38CD2D9F585C4B27141DB4DD8A58 121614~|~1~|~1~|~01/ENH~|~Plan Split for MPO Transportation Alternatives funded scope.~|~28 - Facilities for Pedestrians & Bicycles~|~64DEDEE6C3986299EBC65F36BB1429577D3DAA89 124743~|~1~|~1~|~01/STR~|~Bridge Replacement At HOC-374-2.12 (SFN:3703967)~|~10 - Bridge Replacement~|~BD8DE73CFEDBEAC9D4723DA5783CB7F65C2C1EFF 96280~|~1~|~1~|~01/NFA~|~Willams County full serv maintenance facility.~|~17 - Construction Engineering~|~96E32E5E7BFB4492BCA3DE6D32EADD82DADF0E8D 110578~|~1~|~1~|~01/STR~|~Culvert repair throughout the district.~|~~|~D8C8974DCA679A65E6753494446CB38F5D3AF3CB 103776~|~1~|~1~|~01/NFA~|~Village of Aberdeen SRTS project. Shared Use Path.~|~01 - New Construction~|~841ACFF9F86F29956961CFBE0DDF98BA8967D0DA 97041~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~349A51357C6DBA4307CF8E6A5F6D2B424D3E665B 116689~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0BFF6893B7A34656B56C09B60840503B0D8EB9DC 116689~|~1~|~2~|~02/S>2~|~STP > 200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~D8548889C890DAA0CA0A11C4151B5134FFDF7D42 116689~|~1~|~3~|~03/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F2B9A8591E3FD7F19F61ECD37D671D6223E70E39 98712~|~1~|~1~|~01/NFA~|~Transp mitigation~|~05 - 4R Maintenance - Resurfacing~|~C10ABE301B286783C4B6741A943B39CC48BF30F3 98452~|~1~|~1~|~01/NHS~|~This plan split includes all construction work associated with resurfacing and restriping US-50 from State Line to Lawrenceburg road.~|~21 - Safety~|~0664CC6AFFA0BF0DCE9520CE4EB31B30C3ABFB8D 98452~|~1~|~2~|~02/NHS~|~Drainage improvements includes small culvert replacements for HAM-50-0001, HAM-50-0015, HAM-50-0021, HAM-50-0026, HAM-50-0032, HAM-50-0033. Replace or line HAM-50-0041. Evaluate and possibly replace HAM-50-0048.~|~44 - Other~|~6C97C1EF4AE5BD2D0C2EF9EDE5DD9684A4C1062A 82826~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a 2" asphalt overlay treatment. MOE 26 0.00-5.56 and MOE 565 0.00-4.10. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~08ED4491937FA4009757485F52282678E9BC6AD1 95344~|~1~|~2~|~02/STR~|~Bridge Replacement.ADA SR41 5.20 (SFN 0100870)From PID 83923~|~10 - Bridge Replacement~|~6CEEBFB348D170C7E018FE185F166F63925D440C 95344~|~1~|~1~|~01/STR~|~Culvert ReplacementO C 000 Other Federal-Aide Highway Major Collector RURAL ADA -SR -41 5.890 to 5.900 0.020 80/20 Split~|~04 - Reconstruction - No Added Capacity~|~72FBE4B137E0180D0BC419948B92C850DA1F496F 118521~|~1~|~1~|~01/MPO/CIN~|~Road diet on Gilbert Avenue from Court Street to E. MLK Drive. Reducing number of vehicular lanes, adding bike lanes, constructing curb bump outs at intersections to shorten pedestrian crossing distances.~|~~|~D59E02558F75D78AAD53ADFDF1CF12D9C3DD592A 94600~|~1~|~2~|~02/NFP~|~Facilities fence at assorted outposts throughout the District.~|~44 - Other~|~3222F53262549F84B3CEF0A034D59199C578AE88 94600~|~1~|~1~|~01/NFP~|~Repairing/maintaining right of way fence throughout six Counties. Two-year contract.~|~44 - Other~|~FE9727B6BB3C6D38CE0E137B05F83C524C1FC64A 107161~|~1~|~1~|~01/SAF~|~Install left turn lanes on SR 48 at the intersection with Nutt Road/Hibberd Road.~|~21 - Safety~|~46E03210B370AFAEF1FF20F0C5B02D1A75AB60EB 109751~|~1~|~1~|~01/STR~|~Ac overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~C97D48F4A55B1A8F9BAF0B5CE8CA9A3A1733A844 109751~|~1~|~2~|~02/SAF~|~Signal radar detection~|~21 - Safety~|~00F27D5F3801C94202FE1934179BD66E5FFB6B49 124222~|~1~|~1~|~01/NHS~|~Plan split for NHS bridge.~|~13 - Bridge Rehabilitation~|~DE2AD7B9E945B1A2ABD7836BD4CD810953A784C5 102937~|~1~|~1~|~01/SAF~|~Plan Split for the rural locations~|~21 - Safety~|~EA51933CD91FD83F429214345FFC3023AE61FE9D 104914~|~1~|~1~|~01/NFA~|~Northwest Schools school bus replacement project~|~44 - Other~|~04A821AC6505E06FEBC2AEB94F67BD7A6C82BCFC 92330~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 78 25.00, SFN 5800811. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~53C343A8095C0EB2271A0A33E3095F1393EC5AA8 113927~|~1~|~1~|~01/S<2~|~Small City funded items~|~05 - 4R Maintenance - Resurfacing~|~1B05B6852A11F404AE679BEE2F1E3FA2D54340B8 114351~|~1~|~1~|~01/BRO~|~Repair structure carrying SR 259 over the Tuscarawas River by removing the existing wearing surface and placing a new rigid overlay. Repair expansion joints and seal concrete surfaces.~|~13 - Bridge Rehabilitation~|~93960BED91588C283B85B59A22EB7C38D8C85329 122596~|~1~|~1~|~01/ERD~|~Correct a landslide that impacts River Road (US 50) between Southside Avenue and the Speedway property (2857 River Road). Repair is likely to consist of a drilled pier wall with a length of approximately 300 feet in length.~|~66 - Resilience Improvement - Highway Project ~|~4EFB89EE25879664B562E350D904D259B960D6B3 83938~|~1~|~1~|~01/STR~|~Resurface existing roadway along with other roadway related items on MER US 127 from SLM 8.89 to 11.33 (segment length 2.44 total lane miles 4.88).~|~05 - 4R Maintenance - Resurfacing~|~1632A15282B2B7478FD34E105457AE9B7991EAD7 83938~|~1~|~4~|~04/STR~|~SFN 5402557 MER 127 1132 seal structure with SRS.~|~13 - Bridge Rehabilitation~|~3901245F7AB42FBA54853375BED543A8B2DBDB59 83938~|~1~|~3~|~03/STR~|~Patch 4' wide strip at the bridge deck and approach joint with MS class concrete on SFN 5402492 MER 127 1013 and 5402522 MER 127 1060~|~44 - Other~|~5557D4618304D88AD84CB55EB1A87726557BDB54 83938~|~1~|~2~|~02/S<2~|~Resurfacing of the existing roadway along with other roadway related items on MER US 127 from SLM 12.32 to 12.58 (segment length 0.260 mile total lane miles 0.520)~|~05 - 4R Maintenance - Resurfacing~|~94F2AA0A3E062F43F3304DBDCA5382A4AD915138 112793~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~293394823220B945404517425D906BB4FF765947 112793~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~10AFAE854CCD74C603ED5F3F92D811268A661227 112793~|~1~|~2~|~02/IMS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~3024D956649DFF31B65D93BD6914EC45A736D57B 112793~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' structure. ~|~04 - Reconstruction - No Added Capacity~|~28E6B3A337D72E2C5E1EBA0B59D6CE656EB194FC 91930~|~1~|~1~|~01/S<2~|~SCI SR140 2.38 Intersections Improvement On SR140, begin project 2.38 miles north east of US52. It is proposed to improve the sight distance of two intersections along SR140, CR15 (Dixon Mill) & CR250 (Lang Solcum). Right-of-Way for this project is needed in 2014. The project will be scheduled for 2015.80/20 split01/S<2/OT/State~|~21 - Safety~|~49180C9CC963C19B46F618BCB70CDF7442B42756 124354~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federal bridge on interstate system~|~13 - Bridge Rehabilitation~|~A52B1CED48E514A75640B05E16E48707F5CB5B72 99999~|~1~|~2~|~02/STR~|~Plan split for culvert work on GEA-87 and LAK-307~|~44 - Other~|~F0C1668768E35674C725648A89174C6E800EC524 99999~|~1~|~1~|~01/NHS~|~Split for culvert work on CUY-252~|~44 - Other~|~A561CDB529E1249E0CE55EA9329D1C100F396D92 127153~|~1~|~1~|~01/NHS/GREE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F89B6A94AA7FDD62D1F8AAA491B6C0B07FA1E639 127153~|~1~|~2~|~02/S>2/GREE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~753793D4757B246414EE6D056FE6937E5F4F16FF 127153~|~1~|~3~|~03/NHS/GREE~|~Full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~DFA5159689B483DA32A5BC46B67AEEF23FC1172B 127153~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~F5055F80FC09F3DFFF9B87A65CFB6D4F61B3F2DF 127153~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~51D545FE11E619FA72FCDE7B6818CA594F1138F8 109929~|~1~|~1~|~01/IMS~|~Split for slope stabilization work. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2B9AF241B42E439C22CC862D1188233D44D1DB23 117128~|~1~|~1~|~01/S>2~|~All work associated with this project is included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~FA8D823D8E00D3EEBEB37415D377C3D3A32F9B6B 102024~|~1~|~1~|~01/NHS~|~Installing new signals at SR-45 & Champion Ave (CR-200) and SR-45 & SR-305~|~21 - Safety~|~0FB977206FE0149D9EFBDD1665292429B5E31A72 84590~|~1~|~1~|~01/STR~|~Resurfacing of State Route 172 from SLM 20.19 to SLM 30.32, in Osnaburg and Paris Townships, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~77627B0B2D2E72FB6C6281ABA0E9FAFF5DAB5878 84590~|~1~|~2~|~02/STR~|~Deck overlay of two structures. SFN# 7605471, STA-SR172-26.82 over Hugle Run and SFN# 7605390, STA-SR172-25.53 over Black Run Creek.~|~13 - Bridge Rehabilitation~|~995E6762FACA028FB5A14DCF720713054F12E7A7 84590~|~1~|~3~|~03/S>2~|~Resurfacing of State Route 172 from SLM 19.15 to SLM 20.19 in the Village of East Canton, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~DDFCA46D8A57A9CD7B867436A2A14C1877D8E11D 90582~|~1~|~1~|~01/BRF~|~Plan Split for SFN 6760007 Fred Fuller Park Bridge over the Cuyahoga River.~|~10 - Bridge Replacement~|~A352DE6D7A11A6351B0291EED07AE8F8F61C34F0 102597~|~1~|~1~|~01/STR~|~This project is to cover the federally mandated sign upgrades for rural curves on two lane roads.~|~21 - Safety~|~97E368883F35624C50BC8FFA12F2408D45AD7D20 110882~|~1~|~1~|~01/SAF~|~signal upgrade work eligible for federal-aid~|~21 - Safety~|~5950468D9FD7FECDCCFAD9C0614346B11F823CED 110882~|~1~|~2~|~02/NFP~|~Plan split for non-federal aide eligible work for 100% local items of work.~|~44 - Other~|~E6BDF0C0F33A242B56AB3B9B79E84FDB942F050A 97479~|~1~|~1~|~01/BRO~|~OH and Kentucky Share of the KYTC Carl Perkins Bridge Painting Project.~|~47 - Bridge Preventive Maintenance~|~C6ABF7D98249AA213DD20DFDEDF439CE9CC9EC34 111379~|~1~|~1~|~01/NHS~|~All the work in this grade separation project. Federal funds from the safety program of the County Engineers Association of Ohio (CEAO). Non-federal funds will be provided by Hancock County and ODOT.~|~08 - Bridge - New Construction~|~78628E56759E001BC1C658AAEEE21976B22656C2 117802~|~1~|~1~|~01/NFP/NALB~|~Major Widening of Green Chapel Road from Clover Valley Road to Mink Street~|~03 - Reconstruction - Added Capacity~|~146325F63CD055DE26978D312E4007C718ABEF72 97931~|~1~|~1~|~01/STR~|~Replace structure SFN 5001862 MAH-US 62-3.31~|~10 - Bridge Replacement~|~3511D5D595E984B80B62F03ACBF3E483A7CB3A55 124390~|~1~|~1~|~01/STR/FRAZ~|~Improvement to pedestrian facilities.~|~28 - Facilities for Pedestrians & Bicycles~|~556EFD91BFE17ABCFE247FE88CAE70F329525E8A 90908~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~3C991462776357E01D5996BB25C69643B77B8C8E 126328~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~F9CED1E20C0E83965D9B603CAE8C5EFD7E227995 118877~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~8BE690606E1BCE711BA608A331AE5ACD72A1DFA1 116688~|~1~|~1~|~01/NHS~|~All work on NHS route US33.~|~05 - 4R Maintenance - Resurfacing~|~344C4E7E17C6B18731A9C95D91A9C6BDAC05A13F 116688~|~1~|~2~|~02/STR~|~For work in the rural areas outside of the NHS (work on SR 49 & SR 81)~|~05 - 4R Maintenance - Resurfacing~|~BE1AC1CDF515B456AAD90C3F6248E8627B466291 116171~|~1~|~1~|~01/SAF~|~Pavement marking installation (various routes) utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~3B5A2DDF17DA14D333609AB1AD39C6FE25CAC9D3 122235~|~1~|~1~|~01/NFA~|~NEVI Round 2B Corridor Group 33-A~|~~|~1BE51D8BBCFED79A74C3BDF51046B8CADED8CF3D 122235~|~1~|~2~|~02/NFA~|~NEVI Round 2B 33-A~|~~|~46ECE9EFF3360F7BDACDA7E8B52DF0C6C3B8758F 122235~|~1~|~3~|~03/NFA~|~NEVI Round 2B-33-A~|~~|~C429A3CB95E8851167423C77ACAFA1DA366C1DCF 124645~|~1~|~1~|~01/IMS~|~Reconstruction and adding a 3rd lane.~|~~|~2A6F8DF524E9D80D4E506252AC5E7C7BE222E4AB 117369~|~1~|~1~|~01/BRF~|~Added plan split.~|~10 - Bridge Replacement~|~BE676EF856043B720BA96D283C761F057CC54769 103477~|~1~|~1~|~01/STR~|~Landslide repair. ATH 124 1.60. DSR ATH-009.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8D61D5AAF7554CAD4344CB065DBE9ABE1F8676B2 95321~|~1~|~1~|~01/S>2~|~Plan split for culvert work~|~44 - Other~|~8185BC5E79AA1022580D1B1FDAC9D68FE36316A9 87798~|~1~|~1~|~01/NHS~|~Rock Cut Slide repair~|~44 - Other~|~E60A64B070FF2E23AA1B8FB3B6A6FAFFE0B43E34 104706~|~1~|~1~|~01/NHS~|~Bridge repair project. HOC 33 00.60 (SFN 3700097). NHS route funded 80 federal/20 state.~|~~|~F0EA44A78233CE24992ACE55CCED6BC98D834A26 117144~|~1~|~1~|~01/MPO~|~Plan split for TLCI eligible work for ADA mobility and accessibility.~|~28 - Facilities for Pedestrians & Bicycles~|~D01F354AE2AD5CA6A4B9FE865BFD074A33C1CCC2 107273~|~1~|~1~|~01/SAF~|~Intersection improvement.~|~21 - Safety~|~F0C3D22D02DD03CE7F08392A21AF5102BA291040 104871~|~1~|~1~|~01/STR~|~Resurfacing on rural portion of route.~|~05 - 4R Maintenance - Resurfacing~|~BDF9671BD4796AC7E5B3E4ECE721B683B9C5D86D 104871~|~1~|~2~|~02/S>2~|~Resurfacing on urban portion of route.~|~05 - 4R Maintenance - Resurfacing~|~6C266763412F3AF9456C34F63832D7D074149C56 110809~|~1~|~1~|~01/NHS~|~Guardrail Upgrades.~|~21 - Safety~|~7D31922C688EFE177963F8BF38B2E58CB4B82001 126910~|~1~|~1~|~01/SAF~|~GR on various routes.~|~21 - Safety~|~61D65F63976B0A7C0B12941129DD9033CC05F431 93790~|~1~|~1~|~01/STR~|~Replace SFN 6602851Located 1.45 miles south of CR51 on SR335. It is proposed to replace the deficient structure. 80/20 split01/STP/BR/State~|~10 - Bridge Replacement~|~3B1D01553CD689C43CE58F46D3D75CCB5FFB6BEE 92212~|~1~|~1~|~01/NFA~|~On South Bass Island extend the west side of the dock facility at the Miller Boat Line Lime Kiln Terminal~|~26 - Ferry Boats~|~BD5269051304F5B90E01FDBBD0C66BBFF7D81E3B 102216~|~1~|~1~|~01/NFA~|~LAW CR 69 2.33 embankment repair.~|~44 - Other~|~5A9B89AF2A519C5C56595A89C9E56F68AC27B15F 124700~|~1~|~1~|~01/BRO~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~FFDC1E04ACF1BDB3AA1009B337AFF9B296C0D779 107560~|~1~|~1~|~01/S<2~|~Resurfacing: ASH-96-3.910 to 4.24 FED/ST 80/20~|~05 - 4R Maintenance - Resurfacing~|~5C70D000A4349EE879392B005A49C4C68CCAF6E4 107560~|~1~|~2~|~02/S<2~|~Resurfacing ASD-96-4.24 to 5.45 FED/LOCAL 80/20~|~05 - 4R Maintenance - Resurfacing~|~185965CC8731ED14B52073B309E0992D291C2774 107560~|~1~|~3~|~03/S<2~|~Resurfacing ASD-96-4.24 to 5.45 LOCAL 100%~|~05 - 4R Maintenance - Resurfacing~|~BF1291487F93F2959848BBE52D2266BF8AA04268 105175~|~1~|~1~|~01/MPO~|~Construction of a shared use path connecting the City of Mason trail system near the Mason Sports Park to the City of Lebanon's Countryside YMCA Trail (which has connectivity to the Little Miami Scenic Trail).~|~28 - Facilities for Pedestrians & Bicycles~|~6D770E5A16B3A0C1B5BE2F3F834767C0B384F0CA 104083~|~1~|~1~|~01/BRO~|~Bridge replacement on Mock Road. township/county slm is 3.65~|~10 - Bridge Replacement~|~2B5A059A60BCF17E10C6077A865AD2E249A5D2B9 125607~|~1~|~1~|~01/NFA~|~Credit Bridge rehab~|~13 - Bridge Rehabilitation~|~9BDC0C2B887E9E0F8FA7A59E6314D01861C25626 116160~|~1~|~1~|~01/STR~|~Culvert liner. NOB 78 12.57, SFN 6101267.~|~17 - Construction Engineering~|~1B5B83ED79467CC06A496D5103FE6FE5E65E79FA 104799~|~1~|~1~|~01/IMS~|~Reconstruction of existing pavement~|~04 - Reconstruction - No Added Capacity~|~24326DBDF4AA8CA2BD1686F7AF29C10D2F5DFCBB 104799~|~1~|~3~|~03/IMS~|~Culvert repair work on structures FRA-71-10.40 (2507226) and FRA-71-12.34 (2507463)~|~04 - Reconstruction - No Added Capacity~|~DA414EBF7D5EB3D06D89E466D569F31F42AE9133 104799~|~1~|~4~|~04/IMS~|~Bridge rehabilitation of existing bridges~|~13 - Bridge Rehabilitation~|~1C0925B1FD2A39DAEAD86075D7428BE9C0CD9EB4 104799~|~1~|~6~|~06/IMS~|~rehabilitee of existing bridges~|~10 - Bridge Replacement~|~E6F2669FD7C9FEDE7FC3FFDC970291C907C90DC6 104799~|~1~|~2~|~02/NHS~|~Additional lanes on IR 71~|~03 - Reconstruction - Added Capacity~|~907D0D2C381B4B5E34556A0D240BBC2202CC7D27 104799~|~1~|~5~|~05/NHS~|~Work to widen structures~|~13 - Bridge Rehabilitation~|~C901A4B9D2A3F79543A2911A86465EDC11180F52 104799~|~1~|~16~|~16/IMS~|~Repair of damage caused by vehicle accidents~|~04 - Reconstruction - No Added Capacity~|~2C639D5EAA54A19C603D4C956509ED9D9BB075CD 104799~|~2~|~9~|~09/IMS~|~Replace existing width Ramp AReplace existing width ramp B from gore at B1 to Stringtown RdReplace ramps C, D, G, HRetaining wall along Ramp D~|~04 - Reconstruction - No Added Capacity~|~B748E5490B92B2498A4D84AE90502074EF288615 104799~|~2~|~12~|~12/IMS~|~Replace structure FRA-270-0014~|~10 - Bridge Replacement~|~2FDCBE954562BE69A0C3C4F07C9D600A84D4EAFE 104799~|~2~|~14~|~14/IMS~|~Minor work on Stringtown Rd structure over IR 71~|~13 - Bridge Rehabilitation~|~EFC9FF685F06B5BE2D9914EA77B2025B0AF41CA7 104799~|~1~|~7~|~07/NHS~|~Widening of structures to provide an additional lane in each direction~|~10 - Bridge Replacement~|~9C4CB708B518B769F13A97317EDC704CB3CAC3AE 104799~|~1~|~8~|~08/NHS~|~Project eligible utility costs - power pole relocation~|~43 - Utilities~|~33384F0A970D2E970265CB50D4AA1554787F9A7C 104799~|~2~|~10~|~10/NHS~|~Widen Ramps A and B (at Stringtown Rd), noisewall along ramp A~|~04 - Reconstruction - No Added Capacity~|~4B641B965F5F2C103C999599CE604545DC2A1E13 104799~|~2~|~11~|~11/NHS~|~Construct new Ramps B, B1, B2~|~01 - New Construction~|~CB1AC6425B8CFDB8FB91F18BDFCB410152120F85 104799~|~2~|~13~|~13/NHS~|~Construct new structure FRA-71-1050A~|~08 - Bridge - New Construction~|~BBCF61D7C675467E24887F6577F8C3D202D9BB02 104799~|~2~|~15~|~15/NHS~|~Noisewall along IR 71 south of Stringtown Rd~|~44 - Other~|~CC9FA9A02B032FC810E3FC0B118705ECE57C920A 113067~|~1~|~1~|~01/NHS~|~Pavement patching on: GRE SR 444 SLM 0.00 to 3.31~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F8517C266ADB441DA41B3E2427DBA0E08F36BAD4 126288~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~F0F96D35483D17500C480E53FB1CAF45F6D71DAA 116545~|~1~|~1~|~01/MPO/HAM~|~Development and implementation of a parking management system in the Banks intermodal center.~|~21 - Safety~|~F3963AFF199B3072C1F93C2A4E3CDFBE48B7CB88 116545~|~1~|~2~|~02/NFP~|~Plan split for 100% local cost of items that were determined not to meet Buy America requirements. Allowed to remain in the project but required to be funded 100% locally per 4/24/25 letter to Director Boratyn from FHWA.~|~21 - Safety~|~E37C03FD9FD3FD039BB33F0D260F5F495E519F64 124857~|~1~|~1~|~01/NHS~|~Spray line culvert NHS~|~44 - Other~|~7DB3687677620703E7D746513D3FA958D070F738 124857~|~1~|~2~|~02/STR~|~Culvert replacement STP Rural~|~44 - Other~|~8D26AC12B460416A3056E8C1432A48B2595C7B03 108705~|~1~|~1~|~01/S<2~|~Roadway work. Federal funds from the Small City program with the local match provided by the City of Van Wert. After the cap is reached all funds will be provided by the City of Van Wert.~|~04 - Reconstruction - No Added Capacity~|~F91FF57E5A7192ED22681EE185BF304C6E93A5BE 108705~|~1~|~2~|~02/NFP~|~Work for a section of sanitary that will be replaced as part of the project. This will be paid 100% by the City of Van Wert.~|~43 - Utilities~|~1B02142B9FCC3D03970E7A6471C24C6E92B6CD3A 101751~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - Plan Split 1 for GUE-209-00.00 to 07.07, MUS-209-00.00 to 1.64~|~05 - 4R Maintenance - Resurfacing~|~517D1A4E775EE9D0D021D53C4FB8D0078B6F00FA 101751~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - Plan Split 2 for GUE-209-07.07 to 07.64~|~05 - 4R Maintenance - Resurfacing~|~F0596F8EDAC58E82E13B2528A161AACE9B5123CA 101751~|~1~|~3~|~03/S<2/CAMB~|~"03/S<2/PV/CAMB" - Plan split 3 for GUE-209-07.64 to 8.11~|~05 - 4R Maintenance - Resurfacing~|~B9A617F5EB8C12A65E47A45ACE37848BA3B48227 123676~|~1~|~1~|~01/S>2~|~Superstructure Replacement.~|~13 - Bridge Rehabilitation~|~4A509E75D30C8889CFF7FFE138DD9A585B09E7C3 115573~|~1~|~1~|~01/NFP~|~Replacement of MED SR 0057 08.37 Culvert. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~599BF0F2CC711F6092A0682DC6BB8EF7E7ED8E05 115573~|~1~|~2~|~02/NFP~|~Replacement of MED SR 0057 08.37 Culvert. Additional work.~|~~|~ABC4D7A25F5D9B00172F138C766420BB553052AE 91927~|~1~|~2~|~02/SAF~|~LAW SR243 17.83 - 17.95 Safety Portion of Project. ? Superelevation improvement? Widening to increase lane width and add shoulders? Installation of guardrailMake this stretch of road safer by improving the superelevation, adding graded shoulders, and installing guardrail to protect the hazards. With the proposed fix, the roadway would be upgraded to 10 ft. lanes and 6 ft. graded shoulders (4 ft. treated) to allow the guardrail to be installed. The superelevation would be improved to 0.04 ft/ft to meet a design speed of 35 mph. The superelevation transitions will also meet a design speed of 35 mph. With using these transitions and tying into the existing pavement, 50-70% of the superelevation at the PC will not be acquired. Since the first 150 ft. of the curve is in a 55 mph zone, we will need to obtain design exceptions for lane width, graded should width and superelevation (position, transition, and rate90% Fed Safety Funds/10% State Safety Funds02/SAF/OT/State~|~04 - Reconstruction - No Added Capacity~|~9724519FBC5776DD7B3BC01F3D5C55F1D2666708 91927~|~1~|~1~|~01/STR~|~LAW SR243, 17.83 - 17.95 Culvert Repair/Replace On SR 243, project is at SLM 17.91, which is 0.25 mile south west of its interseciton with SR 7. It is proposed to replace the culvert. 80% Fed/20% State 01/MPO/OT/State~|~04 - Reconstruction - No Added Capacity~|~A93C277B608BD44BC0FC1DEC64DBDAD19E6DF082 91927~|~1~|~3~|~03/STR~|~Plan split for unknown Utility cost.~|~~|~9787FC48FE4D11B9333A986E5860CD3341014F46 91927~|~1~|~4~|~04/STR~|~Plan split for ER event DSR LAW-003.~|~04 - Reconstruction - No Added Capacity~|~8EFC3061B870C630E03EFC250527275EE805BD34 112658~|~1~|~1~|~01/MPO/NILE~|~Resurfacing of Salt Springs Rd from West Niles Corp Limit to East Niles Corp Limit and resurfacing of East Federal St from SR 169 to SR 46.~|~05 - 4R Maintenance - Resurfacing~|~E9973BB7D68E5F0D7FCABF012B57F2770BB5A462 105881~|~1~|~1~|~01/BRO~|~Plan split for CPP relocation from the structure~|~13 - Bridge Rehabilitation~|~0A70E785BBB1BE2B584C46B60DE7B54B4EDF64C7 88726~|~1~|~1~|~01/SAE~|~Reconstruct various runs of guardrail throughout the District. DAR-SR-47 20.170 to 23.720 AUG-SR-67 14.880 to 18.940 MER-SR-49 5.040 to 13.9~|~~|~73630C229AA676EC8FEBE7EB99605736C3CE1D54 111487~|~1~|~1~|~01/SAF~|~LAW 93 1.36 Roundabout & sidewalk~|~21 - Safety~|~B52BD8D60DE70BE54A34551D1A4A6C950C0B9979 111487~|~1~|~2~|~02/NFP~|~Split for 100% local cost.~|~21 - Safety~|~942803334296AF04677BE59646A67EAF17CA4104 111487~|~1~|~3~|~03/STR~|~AEP delays plan split.~|~21 - Safety~|~66A9B6FE40D42EB37E093555FA2E300AC4D6EC0B 106814~|~1~|~1~|~01/STR~|~Bridge painting project. GAL 141 12.46 (SFN 2701685), GAL 233 1.66 (SFN 2703092) and GAL 233 0.16 (SFN 2703009). Rural other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~FF3C8AC21BC5AE2ED2B240A9B4BBF0CA9B58848A 106814~|~1~|~2~|~02/NHS~|~Bridge painting project. GAL 35 16.93 LT (SFN 2701324) and RT (SFN 2701359), VIN 32 5.44 LT (SFN 8202796) and RT (SFN 8202826). NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~37B5CF764FDF7BF974AD09E0F3C456B5759461E5 93811~|~1~|~1~|~01/NFP~|~District wide pavement marking plan for long line FY 14 markings.~|~21 - Safety~|~17DF646C037537FF8CEC7C8113EF692F480948DC 93811~|~1~|~2~|~02/STR~|~This funding split is for the pavement marking material associated with the research locations identified in the plan.~|~21 - Safety~|~572677E629299DBAA661657FA0B76C05B6EF177A 122517~|~1~|~1~|~01/NFP~|~ODNR plan split.~|~05 - 4R Maintenance - Resurfacing~|~2CCFF9804B65E4D30845DDCAC518BEA592D0733C 109702~|~1~|~1~|~01/NHS~|~resurfacing on CLE-32~|~05 - 4R Maintenance - Resurfacing~|~10D5BF1E1E49AF265FA31E54663B3706709AA847 99490~|~1~|~2~|~02/S<2/FCEO~|~Fairfield County Engineer's CEAO County Surface Transportation Program Funding - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comments - Fairfield County resurfacing project on OFAH-Urban segments: 1) Fai-CR 33A -0.25 to 02.96; 2) Fai-CR 33A - 7.95 to 10.92; 3) Fai-CR 33A - 10.92 to 11.17~|~05 - 4R Maintenance - Resurfacing~|~50B10A209985ADE4E91A2CE2E27194E7F35C31C4 99490~|~1~|~1~|~01/STR/FCEO~|~Fairfield County Engineer's CEAO County Surface Transportation Program Funding - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comments - Fairfield County resurfacing project on OFAH-Rural segments: Fai-CR 33A - 0.00 -0.25~|~05 - 4R Maintenance - Resurfacing~|~8448DEA0BB1EF4C4D616E0169FB7884280DEBB7F 112368~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~6C3F888846D6FF56FE09DD179C968646AEF81EC7 94680~|~1~|~1~|~01/NFA~|~Landslide repair project using GSM funds. MOE 26 22.22-22.29. Not on any federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE7A76422A7D80B7C20654305F353A9D1876F276 103945~|~1~|~1~|~01/NFA~|~The County is constructing road improvements, widening Haverhill Ohio Furnace Road between US 52 and Altivia's west entrance, approximately 4900 Linear feet, to three 12 ft lanes and striped as two lanes with one center turn lane.~|~01 - New Construction~|~6B13285C5EBDA9768F276B241F31052D80D6F3C2 105536~|~1~|~1~|~01/STR~|~Work on SR 15 in Defiance County from the Williams County line at 0.00 to the north corporation limits on the Village of Ney at 2.98 and from the south corporation limits of the Village of Ney at 4.98 to the west boundary of the Defiance Urban Area at TR 149 which is at 10.62. All funds are from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~B658CBCDFD53F1DD6D278CBFB94A2F87D29D8431 105536~|~1~|~2~|~02/S<2~|~Work on SR 15 in Defiance County from the west boundary of the Defiance Urban Area at TR 149 which is at 10.62 to the concrete pavement just north of US 24 at 13.15. Although this work is inside of the Defiance Urban Area, it is all outside of the City of Defiance. All funds are from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~0E3DD238E872B488607AE8FBBDA9AC4E2BA90250 101331~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay with repair treatment. NOB 724 0.00-2.75. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~16EEBE2FFFE0573690F42133570E65E9BE42C568 114235~|~1~|~1~|~01/NHS~|~All the slide repair work is in this project is in this plan split. Federal and state funds from the GSM program. After the GSM cap is reached funds will come from the District Preservation Program budget.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7E4B96408E4925B40ADFA97AEDBB7DF5A12BCF10 121394~|~1~|~1~|~01/NFP~|~27~|~17 - Construction Engineering~|~6EAB01032F2DBC6BDA76C92EEF0BBDBE586DC889 96601~|~1~|~2~|~02/S<2~|~Culvert replacement project. HOC 93 10.96 (CFN 370930405), HOC 93 11.29 (CFN 370935001) and HOC 278 5.56 (CFN 372780035). Urban other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~E4031BB93BAB160B88C7AD6682A34AA556CECAB6 96601~|~1~|~1~|~01/STR~|~Culvert replacement project. HOC 93 9.64 (CFN 370930360), HOC 374 0.46 (CFN 37374045), HOC 374 0.54 (CFN 37374050), HOC 374 2.36 (CFN 373740190), HOC 374 3.25 (CFN 373740260), HOC 374 3.34 (CFN 373740265), HOC 664 0.47 (CFN 376640047), HOC 664 0.53 (CFN 376640053), HOC 664 10.46 (CFN 376640350) and VIN 56 1.46 (CFN 820560011). Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~7618A7E9F3864AC39590BAB0285ADEF0966017AD 106804~|~1~|~1~|~01/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~9CA52B88CE90A1321350F4DA23B18187C50A001F 96682~|~1~|~1~|~01/NFP~|~FY 2019 Pavement Preventive Maintenance on various Routes in POR, STA and SUM Counties.~|~05 - 4R Maintenance - Resurfacing~|~088891791B54E7259764E5C25A03784E803057E3 99574~|~1~|~1~|~01/MPO~|~Resurfacing Bailey Road (CR-65) from Mahoning Avenue to Trumbull County line.~|~05 - 4R Maintenance - Resurfacing~|~49776895A980371246375E141E52415C73CEF880 104746~|~1~|~1~|~01/NFP~|~Replacement of one traffic signal, one overhead flasher, upgrade of five intersections to replace heads and add tethers & back plates.~|~21 - Safety~|~5658A10E7346D4A7C9BD500B273BA7BEADB64346 122443~|~1~|~1~|~01/STR~|~Realigning the existing culvert to match the existing channel and restore and strengthen the associated embankment.~|~66 - Resilience Improvement - Highway Project ~|~638790597D0DCA4D60794E2B9DB4E37A962B817D 98359~|~1~|~2~|~02/NHS~|~Lighting project at the Fly 10-01 Rest Area on MOE 7 1.50-1.75. Funded 100% State 4BR7.~|~21 - Safety~|~CE1F6AF9BE98C4A224B79F92C63328B31031C0F4 98359~|~1~|~1~|~01/NHS~|~Lighting project on the Ravenswood Bridge. MEG US 33 28.49-29.10. Funded 80 federal/20 state.~|~21 - Safety~|~D493C22BC943600D3B79F9920F9F918699279A88 122201~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-C~|~~|~E0E1F3F999E4D781B559E45A4D0713C88F8A9B84 94341~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 5.34~|~05 - 4R Maintenance - Resurfacing~|~A6E0FE13EB18DFD9EC366CB61EDA430E93FB90BB 107950~|~1~|~1~|~01/SAF~|~plan split~|~21 - Safety~|~D6155E57E139EBF7AE328828AB6DF386CD691ECE 99204~|~1~|~1~|~01/SAF~|~PIK CR66 3.95-4.82~|~04 - Reconstruction - No Added Capacity~|~175BA1A2BEC9812DD9CD88B1E5C928B73F6BA1BE 114850~|~1~|~1~|~01/S>2~|~US 62 roadway items~|~05 - 4R Maintenance - Resurfacing~|~B029648927E47011D7FC9468D6798FA7A255B46E 99197~|~1~|~1~|~01/SAF~|~Intersection improvement at HIG CR7 with SR73~|~21 - Safety~|~BB9621171305954FB504F87A73242657A2DDAE98 99197~|~2~|~2~|~02/STR~|~Correct curve alignment on CR7~|~21 - Safety~|~E2298D7AFCDF59079CE6A4AD1BC4DAAC8F0641DC 89162~|~1~|~1~|~01/BRF~|~"01/BRF/BR/GCEO" - County Engineer's Association Funding 4B*7(80% Federal) / LNTP(20% Local) - CAP = $901,600.00 Federal dollars - Replacement of 3030423 GUE CR347 0.94 Intersect: Wills Creek; BR Eligible for Replacement: Length=117 SD/FO(1) SR=26.0 DSR=4~|~10 - Bridge Replacement~|~616B8BCE3A9CE5671CA5747404DFA7238AA62A65 95777~|~1~|~1~|~01/STR~|~from SLM 2.32 to SLM 11.06~|~05 - 4R Maintenance - Resurfacing~|~435130CD42F4F4F2EBDE13503A17E46836A28E44 95777~|~1~|~2~|~02/STR~|~Various bridges~|~13 - Bridge Rehabilitation~|~0144805032DEC490C75B3E66E1E98680247D5C78 119224~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing with STP rural area.~|~05 - 4R Maintenance - Resurfacing~|~0DF438829C092DA7E56BF855CC4151C1658A8263 119224~|~1~|~2~|~02/S>2~|~All items of work associated with resurfacing of routes that are located within the Columbus Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~55005F34082614C76331C84BCE36D9C322F5E600 92584~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to widen Fort Meigs Rd WOO TR106 0-0.47~|~04 - Reconstruction - No Added Capacity~|~F159650D69996167A8A63EACE6EE7F412050DD72 101242~|~1~|~1~|~01/NHS~|~Resurfacing US 6 21.04-25.44 (NHS Eligible)~|~05 - 4R Maintenance - Resurfacing~|~D6839044EBBA534C495F6DA8471E002E06A42B9A 101242~|~1~|~2~|~02/NHS~|~Bridge split~|~10 - Bridge Replacement~|~E0EB2BD703CB2FD0773461B33C21B011C45D4DFB 127020~|~1~|~1~|~01/NHS~|~Repair beam seat and add corbels~|~13 - Bridge Rehabilitation~|~595C3489351B084EB398E9C8F86A23A38D4B2417 105791~|~1~|~1~|~01/BRO~|~Split for bridge work~|~~|~A9CF488C4DEC6641573F26EA44DFBDA7050DB3E3 106035~|~1~|~1~|~01/NHS~|~Bridge painting project. GAL 35 15.96 L (SFN 2701235) and R (SFN 2701294). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~4641F7DEDDD7B3FCF94980806BD5E50767FCB830 101212~|~1~|~1~|~01/SAF~|~Various corridor and intersection imprvements including a road diet and pedestrian beacons on Detroit and Main Street.~|~21 - Safety~|~8B9C52D6BA0DB1085A42006E9C305BE31DC8322E 101212~|~1~|~2~|~02/NHS~|~To repair damage caused by contractor to newly completed signal work.~|~21 - Safety~|~B2E4504D9A805CF546D516898E740F93AC407AC8 111024~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation~|~13 - Bridge Rehabilitation~|~111504D51819E7F33BEA3DFCF5949CDDA1A16658 120720~|~1~|~1~|~01/S>2~|~tree trimming plan split.~|~01 - New Construction~|~7D38A4B81A0B625E0AD5F39440B571F2ED295505 25191~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI SR158 2.48-15.83; 2) LIC SR158 0-0.56; 3) LIC SR158 1.1-2.28~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~308029CBF36F4EB663422B0BA7C299A3B649F094 25191~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation-Pavement Marking 4MP7 (100% State) - No CAP - Pavement Markings on: 1) Fai-SR 158-02.48 to 15.83; 2) Lic-SR 158-00.00 to 00.56; 3) Lic-SR 158-01.10 to 02.28;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE44DB62A99F54DD52F5A47F124D58D812EC02FF 105752~|~1~|~1~|~01/NHS~|~Resurfacing and sidewalk connector in the City of Kettering.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~98E4136714418DEF6C90B962207837321F4E2686 100466~|~1~|~1~|~01/S<2~|~Realignment of the intersection, including curb, sidewalk, concrete base, asphalt pavement, storm sewer, street lighting, landscaping and street amenities.~|~03 - Reconstruction - Added Capacity~|~FD91F324F6FA7F50EB784F07889D3FDC89027918 118634~|~1~|~1~|~01/BRF~|~Complete bridge replacement utilizing Municipal Bridge Program Federal Funds at 95% (includes 15% TRC).~|~10 - Bridge Replacement~|~43671E062EF314ECC3B13A93990C4253258AD0B9 97346~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County Engineer Bridge Replacement over Muskingum River- CEAO funding project maximum of $5 million - SAC code 4B87 and Local Major Bridge (4HC7) funding of construction at $13,985,594.00~|~10 - Bridge Replacement~|~288DE4AD902F23780B347AAE2F5C74DCCBB1C101 97864~|~1~|~1~|~01/MPO~|~Adding 5' bike lane on Springdale Road from Hudson Drive to Berkshire Road.~|~28 - Facilities for Pedestrians & Bicycles~|~BAA49AE19AD6885E7ADBFD9195788DAFCA35DE5E 95117~|~1~|~1~|~01/BRO~|~Replace the bridge deck, covert the abutments to semi-integral, and paint the structural steel on SFN5706092 MOT 70 1783.~|~13 - Bridge Rehabilitation~|~6877F9D1B8159C55D62EEF37A784FFDB8E7BCD1A 83342~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~4AD101F57664A989F3213FA690E15C6EA51E8C84 94080~|~1~|~1~|~01/S<2~|~Widen SR 47 from the intersection of CR 32 east a distance of 750'. A signal will be installed on mast arms and upgrading the pavement and markings and signage will be included.~|~04 - Reconstruction - No Added Capacity~|~4EAB69D49606007B5ACB27B993BF66647E5E3523 125757~|~1~|~1~|~01/NFP~|~Plan Split for Ohio MAP Grant funding~|~44 - Other~|~AD5F786843ED3338DD8C9A6C482972C8083F95E5 103538~|~1~|~1~|~01/NFA~|~The Village is constructing Road improvements to support the expansion of the Airstream facility, specifically replacing 1,070 feet of existing pavement 1 1/2 " to create a center turn lane on SR 274 at Airstream Drive, additionally a semi-actuated signal will be added with side street stop bar detection and mainline advanced detection.~|~01 - New Construction~|~76225E77ED1196874A802BAF10E3A676A8557D29 101193~|~1~|~1~|~01/BRF~|~District Preservation Program funds.~|~10 - Bridge Replacement~|~B3DBC7B942E0C469316B5CF2FEE87632548B2651 119192~|~1~|~1~|~01/STR~|~Pavement Markings.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C655759433ECC931E60E414EBB1924F45BBBD554 113512~|~1~|~1~|~01/NHS~|~2" mill and fill with asphalt concrete in the City of Greenville~|~05 - 4R Maintenance - Resurfacing~|~2574F509DC228502D62BD379249A9A310AA4E820 101169~|~1~|~1~|~01/STR~|~Overlay US 36 in Miami County with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~C48351703E5AE96563852713DD34FEF885A9E48E 101169~|~1~|~2~|~02/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~95D019F113EA722270C3AF537BC97537B846295D 118318~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at LOR-20-2.05/SR-511~|~21 - Safety~|~C25E7BEF4949A035DD859B4A5BFE1A9FE0AC6023 125799~|~1~|~1~|~01/S>2~|~Replacement CMP Culverts 2516756 and 6503578~|~10 - Bridge Replacement~|~73EEC69EE0B807986718B18BD01776DA9DC41AC5 125799~|~2~|~2~|~02/BRO~|~CMP culvert replacement SFN 6502946~|~10 - Bridge Replacement~|~8049DE69160C2DE5D584D2F4901112B475390308 125799~|~3~|~3~|~03/STR~|~CMP replace for SFN 4903811~|~10 - Bridge Replacement~|~883DB92256CC50E808E19DF9A894BCC31DBAB18F 105875~|~1~|~1~|~01/IMS~|~Rehab bridge size culvert on IR.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~215BAFDE9BBA353976A9D0F2320951184DC6E1BF 102372~|~1~|~1~|~01/NHS~|~Traffic sign upgrade along SR 7 in Belmont County.~|~21 - Safety~|~B00BEA72977F2F5025ED4286B5B79F7E4E180A42 106219~|~1~|~1~|~01/S>2~|~Minor widening and enhancements with curb, gutter, storm sewer and sidewalks on Factory Road in the City of Beavercreek.~|~04 - Reconstruction - No Added Capacity~|~CD085AB920994C64D8143B277226553CBC8E3CED 111510~|~1~|~1~|~01/NFP~|~Electrical maintenance contract for work at various locations~|~~|~0C55BA76E2948BB5D31F2B8719921D9B8E22F9BD 120749~|~1~|~1~|~01/SAE~|~Single-lane roundabout. ~|~21 - Safety~|~6EC933E0ECD6BA959EFE0C4505BDD0CF86709DDC 94282~|~1~|~1~|~01/ENH~|~Construct sidewalk along County Route 163 (Chestnut Street) in the City of Ravenna, Portage County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~FA85C6BFEB404D6D9DF59B8EE53B07E1EE015530 115595~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~BF4D2B539E61F0E4D2CD3430D90E4F597C1D225A 112418~|~1~|~1~|~01/IMS~|~AC Overlay with repairs.~|~17 - Construction Engineering~|~72476F82DF68B8BACA5F517D3C17A7E1AD594C76 76815~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~~|~7B264CB9C3FA645E6D3594FE4E529ADF8840FBA3 125963~|~1~|~1~|~01/NHS~|~Replace bridge SR104 over NS railroad~|~10 - Bridge Replacement~|~FB05023AABD9112D85CC8128E04923FD1390B5E9 123834~|~1~|~1~|~01/NFP~|~Plan Split for bridge maintenance activities using 100% state funds~|~47 - Bridge Preventive Maintenance~|~AAC3D7705480425AD77B49E964A65FA4D631B688 87228~|~1~|~1~|~01/STR~|~0102911 ADA SR125 1.33 Intersect: Spock Run 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~07814778CED578EE0A63C92392FAA863027FCDB4 93976~|~1~|~1~|~01/NFP~|~District Allocation - Stream Restoration Project~|~44 - Other~|~541626F190684B28EA51EC7FD537AED62BAA18F3 116203~|~1~|~1~|~01/IMS~|~Plan split to correct the failing shoulder on HAM-74~|~66 - Resilience Improvement - Highway Project ~|~BD37D0E78891F05FEFDF00D87E18A8A12BE96D63 98843~|~1~|~1~|~01/NHS~|~Plugging 6 gas wells that were acquired with ATH 50 18.54 project in the 1990's.~|~44 - Other~|~A716167B4D08E62AC2CB477B7DF638B1A48C5BFD 110840~|~1~|~1~|~01/SAF~|~Construction of sidewalks on Country Club Road with 100% federal Safety funds (90% 4HJ7/10% TRC)~|~28 - Facilities for Pedestrians & Bicycles~|~2A0A7D0531026D3BECD4FAF354B7DF66D10640A2 92471~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~44F2C5A28C08F2D8576279F63FC5A0D4CA7B13DF 93517~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - Safety Funded - CAP = $147,000.00 - Gue-IR 77-07.51 to 07.75 - Micro Surfacing; Gue-IR 77-14.26 to 14.50 - Micro Surfacing; Lic-IR 70-16.51 to 16.75 - Micro Surfacing; Lic-IR 70-16.76 to 16.99 - Micro Surfacing; Lic-IR 70-19.26 to 19.50 - Micro Surfacing; Lic-IR 70-16.26 to 16.50 - Micro Surfacing; Lic-IR 70-15.76 to 15.99 - Micro Surfacing; Lic-IR 70-19.76 to 19.99 - Micro Surfacing;~|~~|~0BE22090CCE19430DA7B6AAEF6EAE14BDD01AF28 93517~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - Safety Funded - CAP = $28,000.00 - Per-SR 669-12.76 to 12.99 - Mill & Fill~|~~|~EA1048ADD0C0F4BD0DE6155086732680C7C2FD30 93517~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - Safety Funded - CAP = $85,000.00 - Kno-US 36-13.76 to 13.99 - Mill & Fill; Per-SR 669-01.00 to 01.25 - Mill & Fill; Per-SR 37-19.76 to 19.99 - Mill & Fill~|~~|~FE45D2DD6019000C9BCA01CE23E820C29B8D1606 97240~|~1~|~1~|~01/STR~|~BRO 62 9.22~|~44 - Other~|~25E443318539E6B2A23A8078A506694B28388E3E 105882~|~1~|~1~|~01/SAF~|~Intersection improvement at ATH US 50 8.64-8.83. Convert existing westbound right turn lane to an offset right turn lane.~|~21 - Safety~|~83E5724B52403CF3A5B0091FF6D2DA4A9ACAF513 106306~|~1~|~1~|~01/NFP~|~Installing raised pavement markers on various routes throughout District 4.~|~21 - Safety~|~AA342B7170133E4A024F8CBAC6A586A82A69179A 121004~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 - ODOT/City items~|~05 - 4R Maintenance - Resurfacing~|~1745051B894147F566E5F423089326387FA89F21 121004~|~1~|~2~|~02/NHS/CINC~|~Plan split for the 100% City funded items~|~05 - 4R Maintenance - Resurfacing~|~71C2D8C611E957ED28AF609E69B5997D68A2DA79 121004~|~1~|~3~|~03/S>2/CINC~|~100% Locally funded items off of the NHS~|~05 - 4R Maintenance - Resurfacing~|~5E119ACA1C73E98470E47718C9BAF7D837D3D1D6 99905~|~1~|~1~|~01/BRF~|~Bridge replacement of TR62B over Buck RunSFN 8031231~|~10 - Bridge Replacement~|~70961044FCE0992A9B5CE19D274CEBEA7B3E862E 96057~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - Created for Construction of New Garage, Wash Bay, and Pole Building at existing ODOT Kno County Garage Facility.~|~44 - Other~|~12FD9A228D8B623F688FA7E605F6D03C86BCDA26 121352~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~38F5502D254FEA0120010E2E40E6D54E5A7FA66E 121352~|~1~|~2~|~02/S5K~|~STP 5,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~EF3E17B7223D9101A02E134C7618D9122F10DFAE 98218~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School (SRTS) funding and is eligible for 100% federal funds. Any funds needed ever the SRTS cap will be 100% local funds.~|~28 - Facilities for Pedestrians & Bicycles~|~EFC498816435EBBDC967DF9A09C0118693F32B58 87118~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 78 7.58-7.91. Rural other federal aid funded 80 federal/20 state.~|~~|~44BD89A596FE7C1EB6353003A00169F8FFBF16DB 87118~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 78 7.91-8.84. GAL 588 10.83-11.71. Urban other federal aid funded 80 federal/20 state.~|~~|~B1ADD6B157A654A7A39D76D9549D10A39CED78A9 124361~|~1~|~1~|~01/NHS~|~NHS ps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0736C99DA7F7DEF997F133FFDC3F9F534B7B1647 96704~|~1~|~1~|~01/NFA~|~TRU Brookfield Outpost, tie into sanitary sewer appoximately 800 to 1000' from garage.~|~~|~9DEA0FFE3D2A474EED23020C422C40B810C0A811 103480~|~1~|~1~|~01/BRF~|~Work eligible for Municipal Bridge funding to replace SFN 1860002.~|~10 - Bridge Replacement~|~F0D93324F2C2614DF613A8821401F76D8C7249C3 124949~|~1~|~1~|~01/MPO~|~Plan split for OKI Pilot Paving Program eligible expenses~|~05 - 4R Maintenance - Resurfacing~|~6FEE6B01700FBBF5B62E146CE69831E6FDC12B7C 124949~|~1~|~2~|~02/MPO~|~100% local plan split for work performed outside of Eggleston~|~05 - 4R Maintenance - Resurfacing~|~D5923CAF0EF0792E26969301CDCE2BDCCB3A9624 88564~|~1~|~1~|~01/IMS~|~Pavement repairs and full depth pavement replacement~|~05 - 4R Maintenance - Resurfacing~|~401E43D8063FE174F663BADAC81A536182732B33 108776~|~1~|~1~|~01/S5K~|~All work in this project.~|~05 - 4R Maintenance - Resurfacing~|~B2E713EC830E5A6125083D6A6D31D1182EE53B9C 116929~|~1~|~1~|~01/MPO/HUDS~|~Intersection improvement.~|~21 - Safety~|~BCF1415841329B9A8D16E7BC136BC57B22E24A8F 122829~|~1~|~1~|~01/MPO~|~OKI CR funding (SAC 4CD7). Construction phase capped at $133,445 with a 20% match (TRC)~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~B7873B23026BF4B181F056849ABB1DD2A1289600 104040~|~1~|~1~|~01/NFA~|~The Village will improve Montgomery Road, from Stoll Rd to Stewart Rd, and Stewart Rd, from Montgomery Rd to Euclid Ave, to include major widening and upgrades to traffic signalization and pedestrian crossing.~|~01 - New Construction~|~0EC524BEC96D6F13CF5FBDF53D9A4F7126E27534 102520~|~1~|~1~|~01/IMS~|~Add turn lanes to Interstate I-90 EB and WB exit ramps to reduce the amount of queuing along both sides of the intersection.~|~03 - Reconstruction - Added Capacity~|~4A71ABE3C846A4ADDD9515496818A9B6440A957D 109742~|~1~|~1~|~01/S<2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~A9299C061D477D18E4E40EF645B6A24B88BF7992 94126~|~1~|~2~|~02/S>2~|~Resurfacing SUM SR 532 from 0.00 to 2.63.~|~05 - 4R Maintenance - Resurfacing~|~4EA624ACDB52CF093AE8AC9932942479048DAC41 94126~|~1~|~3~|~03/S>2/TALL~|~80/20 Urban paving of SUM SR 532 from 2.63 to 3.54 and SUM SR 532I from 0.00 to 0.03 in the City of Tallmadge, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~6FE417422C77ACE300DA8EBADF6AB178C0148DAB 94126~|~1~|~1~|~01/NHS~|~Resurfacing SUM US 224 from 14.87 to 16.07.~|~05 - 4R Maintenance - Resurfacing~|~CF99D47A2A1A4B89FE59D4F818DEE2C2BFF8C632 94126~|~1~|~5~|~05/S>2~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~59A518356F9F7AE59B3A764CD51EA07243EDD0AD 94126~|~1~|~6~|~06/S>2~|~See linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~50CFF287DD5BEEDF6A65EB5009E4C79B037AE1B8 94126~|~1~|~4~|~04/S>2/TALL~|~100% City of Tallmadge Items.~|~05 - 4R Maintenance - Resurfacing~|~3EDEA1C24CA0F0CD2B35774A97E82AAAF19F32DD 86562~|~1~|~1~|~01/MPO~|~Resurfacing of Main Avenue in the City of Massillon, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~20E2AC56E780B6C80E208C1FC82C2879A9D8A5A7 92134~|~1~|~1~|~01/NHS~|~resurface WOO US23 0.35 to 2.51 (Urban)~|~05 - 4R Maintenance - Resurfacing~|~D76AE20826D0E2D78BDB9B79693F7C5F234C28FC 92134~|~1~|~2~|~02/NHS~|~Resurface US-23 from 2.51 to 6.02 (Rural)~|~05 - 4R Maintenance - Resurfacing~|~78843073EDA9C96C753B4277CA48547AFDCD428C 92134~|~1~|~4~|~04/NHS~|~Woo-23-6.00~|~13 - Bridge Rehabilitation~|~BB13473D18C5C0533FDB8D6EB4C686E89AE94D3D 92134~|~1~|~3~|~03/NHS~|~WOO-23-3.02~|~10 - Bridge Replacement~|~E5F43A745942ACC4C448B4D69EC4D6CD51E99CD2 97262~|~1~|~1~|~01/S<2~|~Landslide repair.~|~04 - Reconstruction - No Added Capacity~|~EA91C1B731169C272521D96A25C2A4BFF7F6B189 97276~|~1~|~1~|~01/NFA~|~Construct Leffler road.~|~01 - New Construction~|~7038BF76C15E7C824FB70CFAAC2E15B199DC82ED 91066~|~1~|~1~|~01/SAF~|~NB IR-71 Ramps & US-22 ? Restripe and widen US-22 to provide a WB right turn lane on US-22 at the NB IR-71 entrance ramp. ? Restripe US-22 to provide two WB through lanes through the IR-71 interchange. ? Restripe US-22 to provide EB dual left turn lanes at the entrance ramp to NB IR-71. ? Widen the NB IR-71 exit ramp to provide a 600' left turn lane, a 600' right turn lane, and a second right turn lane 410' in length. ? Remove the slip ramp at the entrance ramp to NB IR-71. ? Remove the access points to addresses #8020 and #8031 immediately east of the NB IR-71 ramps. SB IR-71 Ramps & US-22 ? Restripe and widen the SB IR-71 exit ramp to one 800' right turn lane and dual 600' left turn lanes. ? Restripe US-22 from three to two WB through lanes ? Eliminate right turns on red from the SBIR-71 exit ramp to US-22. ? Restripe US-22 to provide WB dual left turn lanes at the entrance ramp to SB IR-71. ? Remove the slip ramp at the entrance ramp to SB IR-71~|~21 - Safety~|~3B3677ED4F4057DB63F3AB90E3A19FEA0C50B324 88000~|~1~|~1~|~01/BRO~|~SFN 2514850/ FRA IR 70-22.920/ Bridge over IR 270(NB) - SLM 22.92~|~13 - Bridge Rehabilitation~|~98EF713966B2D56CCE4D2222EDA1F0F8EAAF45A4 79087~|~1~|~1~|~01/MPO~|~Pavement widening~|~04 - Reconstruction - No Added Capacity~|~29297D3416EBFB3658FB5BFBDEFA693A6B0B04E6 79087~|~2~|~2~|~02/MPO~|~Plan Split for 100% Local Items~|~04 - Reconstruction - No Added Capacity~|~DA158BD4DBE8F588D15AEE5D9FEB3986A6879504 124139~|~1~|~1~|~01/NHS~|~Construction inspection for COTA's W Broad St BRT project that is part of the LinkUs initiative and partially takes place along the unincorporated section of US-40 maintained by ODOT.~|~~|~977E3E519DC8EA4D452F78C3865F4046D3625521 109055~|~1~|~1~|~01/NFP~|~ATB IR 90 Rest Area upgrade.~|~44 - Other~|~46ABD02B55A7D38A40AC31F56F7CAB42663321D3 125790~|~1~|~1~|~01/STR~|~Pile encasements~|~13 - Bridge Rehabilitation~|~635F34CF49736CA77CB6946832356E4631CB56B0 121147~|~1~|~1~|~01/STR~|~Work in this split~|~~|~98C07B8B73FA5B4D9A52A1535C0F752E4C83E3F3 121147~|~1~|~2~|~02/S5K~|~Work Within this split~|~05 - 4R Maintenance - Resurfacing~|~7FC1F05FE46F0FAD4CEE722C066D733918EF0D83 121147~|~1~|~3~|~03/STR~|~Work within this split~|~05 - 4R Maintenance - Resurfacing~|~3A7DDFA230437B440486D0A2830742C11944352D 121873~|~1~|~1~|~01/STR~|~Remove and replace existing culvert~|~04 - Reconstruction - No Added Capacity~|~D4C7CA0F64F7D6B9D6C73E9EA11FE47D61D2DD53 122221~|~1~|~1~|~01/NFA~|~NEVI Round 2B-80-D~|~~|~2F6829732AD3C1D2D991F2E4B9A4365FC5A308D2 111297~|~1~|~1~|~01/SAE~|~Licking County Engineer FY2024 project to install new and upgrade existing guardrail on various county roads. 4HB7 - See cap comments.~|~21 - Safety~|~3D28F80E79EA4DB091A884C797274F029FCF6643 93471~|~1~|~1~|~01/STR~|~Rebuild deck edges, patch pier encasements, reface abutments, and seal deck edges on Stoney Creek, SFN 4603125 LOG SR 292 0879 Tributary to Mill Creek, SFN 4604121 LOG SR 708 0069 Great Miami River, SFN 4603907 LOG 559 0170 and SFN 4603966 LOG 559 0245 both on Tributary to Big Darby Creek.~|~13 - Bridge Rehabilitation~|~3D15DBB44DC1F27C510D821B9CEDAE65AEC2E1C7 122406~|~1~|~1~|~01/IMS~|~All items of work associated with the installation of fiber along I-70 in Franklin and Madison Counties.~|~24 - Traffic Management Engineering - HOV~|~1263EBBC32641193A13D7E6D625F673F49F482B5 106976~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - Resurfacing project in the City of Zanesville on CR 2008 from 0.00 to 0.98 using 4TA7 funds~|~05 - 4R Maintenance - Resurfacing~|~39B95DA243CB5550597F219940ECA371484CC2FD 104760~|~1~|~1~|~01/S<2~|~WAS 60 1.84-2.79 asphalt resurfacing. 80% Federal and 20% Local. WAS 676 21.97-22.06 WB, 22.06-22.49, 23.08-23.25.~|~05 - 4R Maintenance - Resurfacing~|~269417AB95862C9C8E9E4B1919A4B716B73B5C38 104760~|~1~|~4~|~04/S<2~|~100% city items for ADA upgrades on SR 60 and SR 676. 100% local funded. ~|~05 - 4R Maintenance - Resurfacing~|~24D90C728BB2BC8C7FBD9A899C76A1DF0692F4E1 104760~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 676 12.42-20.70.~|~05 - 4R Maintenance - Resurfacing~|~1B0B401071A0CDB71EB1BD1A1C8C5DC52FF05094 104760~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 60 2.79-2.88, 3.06-3.68 and WAS 676 20.70-21.97, 21.97-22.06 EB, 22.49-23.08 and WAS 821 0.00-0.17. Urban other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~3181D575382AD081E35B333E8A964FDD10D015AC 104290~|~1~|~1~|~01/MPO~|~Plan split~|~04 - Reconstruction - No Added Capacity~|~90827C3AC16D5E47609A70AFE03E2569D531B3CB 96532~|~1~|~1~|~01/IMS~|~Generic Plan Split for the construction inspection for FY2019/2020 (C)~|~17 - Construction Engineering~|~16F62CA85ABF5CFF1502B012FBC4CBD97827F103 96377~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation on 4201051 KNO-36-3.75 Intersect: Over North Fork Licking River; BR Eligible for Rehabilitation: Length=86; SD/FO(1); SR=54.8; DSR=5;~|~13 - Bridge Rehabilitation~|~1A20BA22A819F07005AD850F5704631418920E9E 95754~|~1~|~1~|~01/NHS~|~Milling and resurfacing of North Fairfield Road from Beaver Vu Drive to just north of Pebble Creek Drive, including curb ramp upgrades to ADA compliance, repair of deteriorated curb and sidewalk, and installation of raised pavement markers.~|~04 - Reconstruction - No Added Capacity~|~6C5CC016162FDC38B12187EB55C52531B7680DCD 101344~|~1~|~1~|~01/STR~|~bridge rehab.~|~13 - Bridge Rehabilitation~|~CB272AD31815AC30C82F6CF12ADD80630EA63BD9 101344~|~2~|~2~|~02/STR~|~WIL-SR66 0.00~|~05 - 4R Maintenance - Resurfacing~|~3FE8D980869C32FEEEB601EBFB6680C95DD5DB38 96248~|~1~|~1~|~01/NFP~|~Non-Fed, 100% State. SLM 0.00-9.92; 5103908 MAR-746-0625 over Otter Creek; 5103932 MAR-746-0905 over Olentangy River~|~05 - 4R Maintenance - Resurfacing~|~5E54AE5BBDA00D8A100BFA1627E674900123EB69 96248~|~1~|~2~|~02/NFP~|~Concrete deck overlay on 5103908 MAR-746-6.25 & 5103939 5103908 MAR-746-9.05~|~13 - Bridge Rehabilitation~|~626E12E1B18D79036FFCB5BB45ED11792108FC22 92832~|~1~|~1~|~01/NFP~|~Culvert replacements on various routes in Portage County, Ohio.~|~44 - Other~|~7517893E309FB5F78A311741B3B43AFD8B4F917F 92832~|~1~|~2~|~02/NHS~|~SFN 6701836 POR SR 59 6.59 over Wahoo Ditch and Abandoned RR and SFN 6705103 POR SR 261 3.99 over Breakneck Creek~|~47 - Bridge Preventive Maintenance~|~9F41467C4AF9A9ABAD1DDEF59BC30EE23CFE2878 94937~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split.~|~~|~DEFA31A53755EFDDD8E711B6E8FB0C0783C0EEA1 110588~|~1~|~1~|~01/NFA~|~Landslide repair project. WAS 676 3.33. Not on the federal aid system funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4AF1887FE592C506F8605C663E4DEAD1EEACD787 95362~|~1~|~1~|~01/SAF~|~for all spot locations.~|~21 - Safety~|~C6FA300CA58BCA787C20DAF7BE16A528BD44FEDF 100794~|~1~|~1~|~01/NHS~|~Culvert cleanout/erosion control project. HOC 33 19.12. DSR HOC-001. ER Funded 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~95D05999285FD711BA4C4CE4434F1918F5B0B9E5 98545~|~1~|~1~|~01/STR~|~Funding splits for all work associated with bridge PRE-503-1170.~|~13 - Bridge Rehabilitation~|~72F160AD8E29B579A0CCC7BA573FA33B18D1894D 91883~|~1~|~4~|~04/STR~|~"04/STR/OT/ " - District Preservation Pavement Marking 4PS7(100% State) - No CAP - Striping after resurfacing on 1) Fai-SR 204-11.16 to 14.60; 2) Fai-SR 204-15.10 to 18.10;~|~05 - 4R Maintenance - Resurfacing~|~0CA8ADFECB196DC246B47662D16A7DE4DB3362C4 91883~|~1~|~6~|~06/NFA~|~"06/NFA/OT/ " - District Preservation Marking Pavements 4PS7(100% State) - No CAP - Striping after resurfacing on 1) Fai-SR 204-08.10 to 19.13; 2) Per-SR 204-10.00 to 18.66;~|~05 - 4R Maintenance - Resurfacing~|~375EA83FF2F984A8224BEF4376B5B9D266B2AE56 91883~|~1~|~5~|~05/S<2~|~"05/S<2/OT/ " - District Preservation Marking Pavements 4PS7(100% State) - No CAP - Striping after resurfacing on Fai-SR 204-14.60 to 15.10~|~05 - 4R Maintenance - Resurfacing~|~AA83F60E24F72CC8D5E3E1D0B6F1EEDE2D3BAEF4 91883~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Fai-SR 204-14.60 to 15.10~|~05 - 4R Maintenance - Resurfacing~|~B856B78162E03EF42B5A3F87DB678A6A85D2C026 91883~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Fai-SR 204-08.10 to 19.13; 2) Per-SR 204-10.00 to 18.66;~|~05 - 4R Maintenance - Resurfacing~|~B95191F78025C2630FB7C89A09C5B696C3DF4213 91883~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-SR 204-11.16 to 14.60; 2) Fai-SR 204-15.10 to 18.10;~|~05 - 4R Maintenance - Resurfacing~|~C1B9790C27F84BC2954920A7179133A1EDF71889 117240~|~1~|~1~|~01/MPO~|~Sidewalk Work~|~28 - Facilities for Pedestrians & Bicycles~|~FBDAB0F5ACB7E019666748EE520820D65F5050C0 118205~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 183 0.50.~|~10 - Bridge Replacement~|~432103C7F5B5D879E41BFAD66CD2144D2E90864B 120748~|~1~|~1~|~01/BRF~|~Federal/State Exchange project - State Funding~|~10 - Bridge Replacement~|~FFA4844DA92B57A9FA3E9827EFBF910D485D69DA 97203~|~1~|~1~|~01/NHS~|~Type A Emergency bridge repair project. Heat straighten 4 beams. ATH 7 2.53, SFN 0500062. NHS route funded 100% state.~|~13 - Bridge Rehabilitation~|~B68D5AE26ADB500C245E197835C8DCBB6E22CD2A 93772~|~1~|~1~|~01/NFP~|~Two-Lane resurfacing project. MOE 255 11.66-18.08. Non-Federal Aid route, 100% State funds.~|~05 - 4R Maintenance - Resurfacing~|~ADC54F1549EE8ABD27DE5AA025D17F47D70EF9D6 93772~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 800 0.00-13.80. Rural other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~ACCC94839C8CA6AE95CE76CDDA34E9D0D85FA6BA 109926~|~1~|~1~|~01/STR~|~All work for this project is in this plan split, using district preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~38105086B4CDF0FCE2AD9A92F3517225AFE8D725 109926~|~1~|~2~|~02/SAE~|~Adding both centerline and edge line rumble strips throughout the entire length of the project. Funded 100% with safety funds.~|~21 - Safety~|~61D6AE826C2177015CE86F72993A379F4CE3BC09 109474~|~1~|~1~|~01/NFP~|~Resurfacing of Summit MetroParks driveway.~|~05 - 4R Maintenance - Resurfacing~|~7A0F4656E34DEA28AFF8D490FD99430BF4A99011 109427~|~1~|~1~|~01/MPO~|~Construction of a new 10 foot wide asphalt shared use path from Talawanda Middle School to Oxford Community Park.~|~~|~8062ECB2119B7378C6F56031E65D3568065C405D 113414~|~1~|~1~|~01/NHS~|~ER Project ROS-35-32.67~|~04 - Reconstruction - No Added Capacity~|~C37FE7622EA8A7C176942A20D8AE6CE9EB38DF66 92974~|~1~|~2~|~02/S<2/ZANE~|~"02/S<2/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving with related work on: 1) Mus-SR 146-13.01 to 13.31; 2) Mus-SR 146-15.20 to 16.05; 3) Mus-SR 60G-00.00 to 01.09;~|~05 - 4R Maintenance - Resurfacing~|~3EA2F629E1384949469AFDC412BA9F9EF6F8A818 92974~|~1~|~6~|~06/S<2/ZANE~|~"06/S<2/OT/ZANE" - 100% City of Zanesville 4TA7/(80% Federal) / 4BG7(20% Local TC) - No CAP - ADA Ramps with related work on: 1) Mus-SR 146-13.01 to 13.31; 2) Mus-SR 146-15.20 to 16.05; 3) Mus-SR 60G-00.00 to 01.09;~|~05 - 4R Maintenance - Resurfacing~|~E99D7DD094EDFB9686AC82F83CE0BA72E6191E80 92974~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Mus-SR 146-12.20 to 13.01; 2) Mus-SR 146-16.05 to 16.21;~|~05 - 4R Maintenance - Resurfacing~|~C51AB2957ACB719D3A9133FA01407A57070B479A 92974~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation Funding 4PF7 (80% Federal) / 4 PS7 (20 % State) - No CAP - Resurfacing with related work on NHS Roadway segments: 1) Mus-SR 60-17.38 thru 17.50~|~05 - 4R Maintenance - Resurfacing~|~664C2AD8C5071127BC070CC45F2D817212E80480 92974~|~1~|~7~|~07/NHS/ZANE~|~"07/NHS/OT/ZANE" - 100% City of Zanesville 4TA7/(80% Federal) / 4BG7(20% Local TC) - No CAP - ADA Ramps with related work on: 1) Mus-US 40-11.24 to 11.78; 2) Mus-SR 60-16.76 to 17.38; 3) Mus-SR 60-17.50 to 17.93; 4) Mus-SR 60D-00.00 to 00.42; 5) Mus-SR 60D-00.67 to 00.77;~|~05 - 4R Maintenance - Resurfacing~|~59EDEE4BBDE94E8EF3C178AB74028A0E8463E569 92974~|~1~|~5~|~05/NHS~|~"05/NHS/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP -Work on SFN 6001807 Mus-SR 60D-00.05~|~13 - Bridge Rehabilitation~|~ED7400F2F06E1D02AA18FE24E82790840B66A21F 92974~|~1~|~4~|~04/NHS/ZANE~|~"04/NHS/PV/ZANE" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving with related work on: 1) Mus-US 40-10.37 to 11.78; 2) Mus-SR 60-16.76 to 17.38; 3) Mus-SR 60-17.50 to 17.93; 4) Mus-SR 60D-00.00 to 00.42; 5) Mus-SR 60D-00.67 to 00.77;~|~05 - 4R Maintenance - Resurfacing~|~58D8E2E6EE4835EF28B9F1C525265498AEAC2DF5 103954~|~1~|~4~|~04/NHS~|~This plan split includes all work needed to construct the new bridge over SR-32 as part of the interchange~|~08 - Bridge - New Construction~|~2F3FA92A4D9C4425256C163F0CD0F688B07E90EF 103954~|~3~|~3~|~03/S>2~|~CR 388 (Bach Buxton) relocation to receive traffic from proposed Bach Buxton Interchange.~|~03 - Reconstruction - Added Capacity~|~A84C0983A8EBC4959622C0AD255413A86F2258CD 103954~|~1~|~1~|~01/NHS~|~New full movement interchange on SR 32 at Bach Buxton. This includes all new lighting. This work includes creating new ramps, road work on SR-32 eastbound from Glen Este to Old 74, roadwork on westbound SR-32 from Old 74 to Elick, realigning a portion of Bach Buxton (CR-388) and minor roadwork on Old 74 (CR 171) needed to create the new interchange.~|~21 - Safety~|~69E5EFCC2454EA8821013B8EA3F04B4E0C3553E7 103954~|~2~|~2~|~02/NHS~|~Widen SR 32 to provide westbound 3rd lane from the new interchange connecting to the existing 3rd lane west of Glen Este Withamsville.~|~03 - Reconstruction - Added Capacity~|~E6A11AF9DA2A5136BD64695FACBCF1A82030CA30 103954~|~1~|~5~|~05/NFP~|~Retroactive fuel price adjustment~|~08 - Bridge - New Construction~|~8DF1DA5F7AAD0C6A6E916281BAA3A2DE6DD7E16E 88773~|~1~|~1~|~01/S<2~|~District Allocation 80/20 4PF7/4PS7~|~05 - 4R Maintenance - Resurfacing~|~53C7A382DF798542590A40D246DE4F57782C38BA 88773~|~1~|~2~|~02/S<2/WADS~|~Federal/City - 4PF7/4BG7~|~05 - 4R Maintenance - Resurfacing~|~EA03E39EC4370753C8AA5D14530A41567A5F376B 88773~|~1~|~3~|~03/S<2/WADS~|~100% City of Wadsworth~|~05 - 4R Maintenance - Resurfacing~|~FAA80F734C756F3CD87BE1F2C18B99550A962C77 102472~|~1~|~1~|~01/STR~|~Microsurfacing of COL-39 from SLM 7.19 to 13.08~|~05 - 4R Maintenance - Resurfacing~|~C714F09219EEDE0DFD5C2428504C15B18F035422 102472~|~1~|~2~|~02/S<2~|~Microsurfacing of COL-39 from SLM 13.08 to 13.15~|~05 - 4R Maintenance - Resurfacing~|~6B03CEA54390B31AA24E03C4FE0C73DA28FBB66C 102472~|~1~|~3~|~03/NHS~|~Microsurfacing of COL-39 from SLM 13.15 to 13.57~|~05 - 4R Maintenance - Resurfacing~|~4CADC89A8B552F9E2C54DEAB728CC31D3E074B4B 104195~|~1~|~2~|~02/NHS~|~Resurfacing a portion of SR 129 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all necessary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~A3872A79388666A8FCBD9CBC7B8B6D92E0829274 104195~|~1~|~3~|~03/IMS~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~85116FB68AE8E42A11728F23CFEB00DD19DF02A2 104195~|~1~|~1~|~01/S>2~|~Reconfiguration of the interchange of SR-129 with Liberty Way and IR-75.~|~01 - New Construction~|~2709451BD9A1992562859008032B4FECF09CE019 117332~|~1~|~1~|~01/NFA/PCEO~|~Bridge replacement of PER-C00025-2.00 (SFN 6430899) carrying Toll Gate Road over center branch of Rush Creek~|~10 - Bridge Replacement~|~F168D5612577935E6EEA9F18B2C20C9B9A319CB5 124844~|~1~|~1~|~01/BRO~|~Posted single span box beam super replacement.~|~13 - Bridge Rehabilitation~|~2AB1994964297412CA5E441D28EE782817228884 96718~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~7C6F299CD5A295EB71DEDA6A33A893DF319B2272 97534~|~1~|~1~|~01/IMS~|~I-75 bridge (SB) over Segur Ave~|~13 - Bridge Rehabilitation~|~56D9FA0ED128F7C0EE44BD7CA3AAB4C0DED5E643 101049~|~1~|~1~|~01/STR~|~Chip seal various routes in Miami and Shelby Counties: MIA SR 41 SLM 0.00 to 5.68 == MIA SR 201 SLM 9.16 to 12.51 == MIA SR 48 SLM 16.88 to 19.40 == SHE SR 29 SLM 22.37 to 26.23 == SHE SR 47 SLM 0.00 to 3.92~|~05 - 4R Maintenance - Resurfacing~|~C8CD1111DE4BE1285BFB1567E3061EE0789D466A 103298~|~1~|~1~|~01/IMS~|~Split for mowing work~|~99 - State Preventative Maintenance~|~D5AE2E88F3A0586A548633192EA26BFAB328B99F 98113~|~1~|~1~|~01/BRF~|~Rehabilitation of the existing truss Bridge No. PRE-TR 437-0.09 (SFN: 6840248), which carries Foos Road over Price's Creek, including repair or replacement of substructure, superstructure, and bridge deck.~|~13 - Bridge Rehabilitation~|~247E9F2FED416019796F58BA6BAFA5863D03A398 117489~|~1~|~1~|~01/NFA/SUCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~F8A3FE93897E40526952AD1099928E9CE6AFFEF1 93516~|~1~|~1~|~01/SAE~|~100% Federal Highway Safety Improvement Program funding to upgrade non-compliant end terminals on all NHS routes especially routes SR-44, SR-91, and US-422 in Geauga and Lake counties.~|~21 - Safety~|~6E9FF255AA77D4A70FAFDC04507D9ED3BEE10C9B 122337~|~1~|~1~|~01/NHS~|~Superstructure replacement on LIC SR 79 12.87 (SFN 4504925).~|~10 - Bridge Replacement~|~DA9C21FF72E4B76A65B29130C505DDDA69EF9637 111396~|~1~|~1~|~01/MPO~|~Split for TLCI work~|~28 - Facilities for Pedestrians & Bicycles~|~B99C862381954596BB479717074F2E364BD8FF52 105546~|~1~|~1~|~01/STR~|~Rural plan split FAY-207 MAD-207 MAD-62 MAD-62D~|~05 - 4R Maintenance - Resurfacing~|~E2B62F03BC77BAEDDDE939BC462565F7FE5A1D8F 98497~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~50A5218F82325A6F884A4B08905A55DE08C39937 98872~|~1~|~1~|~01/MPO~|~Resurface Niles Vienna Rd from SR 46 to US 422 and Warren Ave from Niles W Corp limit to N Chestnut Ave in the City of Niles. Includes installing new curb ramps with truncated domes, replacing existing loop detectors and new thermoplastic pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~9DA91C1C67DDE2AC626CC41E973CE23FB7F2C316 85090~|~1~|~2~|~02/NHS~|~This split is for resurfacing the portion of the project that is inside of the Kenton Urban Area and on the NHS. Work on SR 309 from CR 171 at 16.93 to 17.93. All funds are from the District Preservation Program budget. There are no local funds in this event. Although the road in this split is inside the Kenton Urban Area, it is outside of the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~A108F70E0122E2F700D2E93C66A94761692845AE 85090~|~1~|~1~|~01/STR~|~This split is for resurfacing the portion of the project that is outside of the Kenton Urban Area. Work on SR 309 from the Urban Boundary at 18.44 to the County Line at 25.91. All funds are from the District Preservation Program budget. There are no local funds in this event.~|~05 - 4R Maintenance - Resurfacing~|~A00FD0FFB78851DD09247B1A451DB9E9E81A71DE 85090~|~1~|~3~|~03/S<2~|~This split is for resurfacing the portion of the project that is inside the Kenton Urban Area and not on the NHS. Work on SR 309 from the location of the old Kenton Urban Area boundary at 17.93 to the new Kenton Urban Area boundary at 18.44. All funds are from the District Preservation Program budget. There are no local funds in this event. Although the road in this split is inside the Kenton Urban Area, it is outside the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~5EC10811D790D332FA7F7E84D533063B9F5CC3D7 100460~|~1~|~1~|~01/ERD~|~Former CSX RR bridge over Maumee River~|~21 - Safety~|~0CD6F4B7DA142CF8A4EDE76DEB8C358EC256A0E6 125841~|~1~|~1~|~01/IMS~|~Plan split for Interstate Mowing in D8. ~|~44 - Other~|~7CF6801E8C048A5573B5D0262D1D0F80C14FB097 99679~|~1~|~2~|~02/STR~|~Resurfacing work on the rural STP portion from SLM 11.59 to SLM 14.47.~|~05 - 4R Maintenance - Resurfacing~|~CE73D3E8538085F16096C54DF355BEFD130C0070 99679~|~1~|~1~|~01/S<2~|~Resurfacing work on the urban STP portion of the project from SLM 10.40 to SLM 11.59.~|~05 - 4R Maintenance - Resurfacing~|~EF0DBB26FF9C9829C4B1E2D1F088445315A98C77 125940~|~1~|~1~|~01/NHS~|~Repair bridges on NHS~|~13 - Bridge Rehabilitation~|~2FFA60932BD0F746577BD897DA1F24F208BEF2E1 97160~|~1~|~1~|~01/S>2~|~Upgrading bridge terminal assemblies throughout Stark County~|~21 - Safety~|~C97F9BCA591BF197CAF289663FD02271A53E8BA2 100187~|~1~|~1~|~01/CMQ~|~Upgrades to three existing signalized intersections in the City of Franklin: Riley Boulevard with (1) East 4th Street and (2) East 6th Street, and (3) East 6th Street with Anderson. Signals will be interconnected with fiber optic cable.~|~21 - Safety~|~FB550B91D740F12148BD83FC898BC1260F77C9E9 100747~|~1~|~1~|~01/BRO~|~SFN 7400934~|~13 - Bridge Rehabilitation~|~E67CAF2039EBD1B9891041F759E2D5A98B7E4875 92434~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1601776 COS SR93 1.95 Intersect: Trib Of Wills Creek; Not BR Eligible for Replacement: Length=11 SD/FO(1) SR=69.6 DSR=" "~|~10 - Bridge Replacement~|~2E5A1607804810E8764588E774BC6AF6139D5E17 106426~|~1~|~1~|~01/SAF~|~Complete sidewalks on the north side of Compton Rd, between Forest Ave and Werner Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~2907C187A060929863BFC306209AEDE97A0C2988 100254~|~1~|~1~|~01/MPO~|~Rehabilitate East 49th Street and Harvard Ave in the Village of Newburgh Hts using MPO STP funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7E0B905BC92A4FE2905A31CCDB4932041822074D 119220~|~1~|~1~|~01/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~84F361DA2AD75C8692C26142BF0E830A0EF5DC15 101125~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural route: CHP US 36 SLM 17.23 to 19.48.~|~05 - 4R Maintenance - Resurfacing~|~0CBA9813CF8A9E3CCEE29E6BB12776F0D11ADDE6 83931~|~1~|~1~|~01/STR~|~Resurface the existing roadway along with other roadway related items on US 36 from Urbana East Corporation Limit (SLM 17.22) to the CHP/UNI County Line (SLM 29.05).~|~05 - 4R Maintenance - Resurfacing~|~5FBEA4B5535A4E05BD8B93546C7DA9EA593D4C11 113690~|~1~|~1~|~01/STR~|~All the work to stabilize the eroding slope are in this plan split. All funds are from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~8FF2034C942D3B634065DD73D65F435FF8D72382 121381~|~1~|~1~|~01/NFA~|~Muskingum County Engineer's FY2029 pavement marking project funded by CEAO - 4HB7 @ 100% capped at $150,000.~|~21 - Safety~|~3D4B2765FF50EAA717D6F508E8DF2135DDB1D0F0 116944~|~1~|~2~|~02/STR~|~Bridge Work to be included with overlay project SFN 7004907~|~13 - Bridge Rehabilitation~|~868368A6A6E149140931E9EB5A9A8BFE2F14F311 116944~|~1~|~1~|~01/STR~|~AC Overlay w/ Repairs RIC-95-0.00 to 3.638~|~05 - 4R Maintenance - Resurfacing~|~CC99CE655EDD4922C9A4B263A819D8EBCE4320F5 125190~|~1~|~1~|~01/CMQ~|~Plan Split for MPO funded CMAQ, primary plan split~|~21 - Safety~|~7591EDE65C0B3A5A652079659FDF9A852A6062FD 126792~|~1~|~1~|~01/NFP~|~Guardrail repair throughout District Six~|~21 - Safety~|~C0009E5C6A3DF8C31B05536ADC55F81573FFD645 86580~|~1~|~1~|~01/STR~|~0803723 BRO SR505 7.21 Intersect: Trib Of E Br Bullskin Crk80 fed/20 state 01/STR/BR/State~|~10 - Bridge Replacement~|~89E6935CF8B55AEC5A3128B8916A04671566DCD0 104654~|~1~|~1~|~01/NFA~|~New Yard.~|~44 - Other~|~683E1DB20D35EE099C1A876BA3E8A5A5C8D7B59B 113410~|~1~|~1~|~01/NHS~|~Install recessed wet reflective pavement markings on various routes in District 10. ATH 33 14.25-16.27, ATH 50 14.14-17.50, MEG 33 4.26-10.02, MEG 124 20.78-22.08, GAL 735 0.00-1.14 and WAS 7 17.60-20.23. Funded 80% Federal Safety/20% State.~|~21 - Safety~|~12889FC321118B8D0AB68735BAC4B2A829604E6A 113410~|~1~|~2~|~02/S<2~|~Install recessed wet reflective pavement markings on MEG 124 20.66-20.78 and MEG 833 4.61-4.70. Funded 80 Federal/20 State.~|~21 - Safety~|~388AB5C648161A521397012EB42F0FD512CEB60C 105589~|~1~|~1~|~01/S>2~|~Columbus urban area plan split: DEL-61-0.43-2.72 DEL-745-1.82-2.57 DEL-36-6.94-7.26~|~05 - 4R Maintenance - Resurfacing~|~E537F231404920854321831557517BE65DCAEED7 105589~|~1~|~2~|~02/STR~|~Rural plan split: DEL-61-2.72-7.84 DEL-36-0.00-1.29 DEL-36-2.78-6.94 DEL-36-17.64-18.03~|~05 - 4R Maintenance - Resurfacing~|~670BBC54D588361C36930F8234ACBD5341F4BDC4 105589~|~1~|~3~|~03/NHS~|~NHS plan split: DEL-23-8.39-8.74 DEL-23-8.75-9.00 FRA-161-15.06-17.12~|~05 - 4R Maintenance - Resurfacing~|~605731A029040640B0D8E2C2561116B19134856B 105589~|~1~|~4~|~04/S<2~|~Urban paving in the City of Delaware: DEL-23-8.74-8.75~|~05 - 4R Maintenance - Resurfacing~|~AD93B05F85560695142032A32D487434B7808634 105589~|~1~|~5~|~05/IMS~|~Interstate plan split: FRA-70-15.29-19.37~|~05 - 4R Maintenance - Resurfacing~|~88155E168D9977DA267F8ACF10C4C7B670E75F3C 93310~|~1~|~1~|~01/S<2~|~Marion urban paving of:MAR-309D: 0-0.34MAR-739: 7.78-9.69~|~05 - 4R Maintenance - Resurfacing~|~4DC4249F7095D6A5AED60A4B78F1A3BE0FDB108D 106827~|~1~|~1~|~01/NFP~|~Plan split for tree trimming work~|~99 - State Preventative Maintenance~|~DC97E64326EF4188A4AA1B9F82279B742DD9E39B 115474~|~1~|~1~|~01/NFP~|~Resurfacing Road R01 in the Mosquito State Park.~|~~|~D0006438D7381B49AB0E9507F688D8C54E984C81 96255~|~1~|~1~|~01/NFP~|~Facility funding~|~44 - Other~|~1D7D3EFAAF47E896F31E5F85AF6790D4B790DE05 122211~|~1~|~1~|~01/NFA~|~NEVI Round 2B 77-A~|~~|~40533C96C5EA5CA067FF4FC9F83616EEF0A12106 119820~|~1~|~1~|~01/SAF/STRU~|~Adding bike lanes and traffic calming measures at the Bridge St/Lowellville Rd intersection.~|~21 - Safety~|~0A9476F23E4CC9DD474D8E7F62BF2DD0B1037335 90112~|~1~|~1~|~01/BRO~|~4803361 LUC IR75 4.34 Intersect: Delaware Ave~|~13 - Bridge Rehabilitation~|~28D233C2262C4323AFBE4C79916DEE4862512711 101528~|~1~|~1~|~01/STR~|~DSR# HOL-002~|~04 - Reconstruction - No Added Capacity~|~68041106F7DF7D740002462016C033CBED9FBDFD 121061~|~1~|~1~|~01/NHS~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~1BB0EC0E19C46CD67126CA14857390EE3256C67B 121061~|~1~|~2~|~02/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5BD493510949E071926F845246B7F1E5B1EC874C 121061~|~1~|~3~|~03/IMS~|~Resurfacing Interstate~|~05 - 4R Maintenance - Resurfacing~|~8E4705179DE43C9CBB37D8F10354AA554BC8A3BA 121061~|~1~|~4~|~04/S>2~|~Resurfacing STP> 200,000~|~05 - 4R Maintenance - Resurfacing~|~C2DF093571AB67730E846AA036DF1151B121EA0B 121061~|~1~|~5~|~05/S50~|~Resurfacing STP 50,000 - 200,000~|~05 - 4R Maintenance - Resurfacing~|~061AE29A486928BE534375F799955084579AEB9F 121061~|~1~|~6~|~06/S5K~|~Resurfacing STP 5,000 - 49,999~|~05 - 4R Maintenance - Resurfacing~|~2BDC693A9F4B7DE6A5E1BAFFE9A2DB9CF38CB124 95540~|~1~|~1~|~01/STR~|~General System resurfacing including pavement repairs and pavement marking on TUS-39 from 0.71 to 2.94 and 7.14 to 8.81~|~05 - 4R Maintenance - Resurfacing~|~207AB29728F518AE2613C8162707007AA6A4D23A 95540~|~1~|~2~|~02/NHS~|~Resurfacing TUS-39 from SLM 9.96 to 10.14 and TUS-211 including pavement planing, asphalt overlay and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~A5A3708343B3D739B6108B5963B3EE0AA3A58ADD 95540~|~1~|~3~|~03/S<2~|~Resurfacing TUS-39 from 8.81 to 9.15 and from 10.14 to 10.24, including pavement planing, asphalt overlay and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~11E13E6E0A1301C837868A22683AE483933F4AD4 95540~|~1~|~4~|~04/STR~|~Work includes pavement repairs within the Village of Sugarcreek.~|~05 - 4R Maintenance - Resurfacing~|~F6479946B5F8324EFC4E88347534761E44A31005 93605~|~1~|~2~|~02/IMS~|~Construct two lane roundabout at I-70 EB exit/entrance ramps.Expansion of second lane of northern roundaboutWidening of SR 29 ~|~03 - Reconstruction - Added Capacity~|~BC1A19432ED0FFEBB7616832EFED0B60A4F4ABCA 93605~|~1~|~1~|~01/STR~|~New bridge over I-70~|~08 - Bridge - New Construction~|~AAE49C7E3238F0A7D7BF23A5E20F40B9E097F2E5 97900~|~1~|~1~|~01/S>2~|~CR 536 - Reconstruction of the roadway including curb, sidewalk, concrete base, asphalt pavement, storm sewer, street lighting, landscaping and street amenities.~|~05 - 4R Maintenance - Resurfacing~|~A408E235EB1D84CCDCE078045526BA56783E0D88 108153~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FAY-22-7.25-8.36 FAY-62D-0.00-0.87~|~05 - 4R Maintenance - Resurfacing~|~C9DC13957D5D78E5CB9A2D227F2417AB60AF3FAD 118904~|~1~|~1~|~01/STR~|~Resurfacing SR 9~|~05 - 4R Maintenance - Resurfacing~|~26D2A494D3B08D94A83C878213CB47DB75A7B605 119347~|~1~|~1~|~01/S>2~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~18CEFF93D1D09224B66FD88D96DD74ECE964F764 122950~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~408E8FA99F516379BD7B61724780DD73DDAF7141 111536~|~1~|~1~|~01/IMS~|~To replace 15? storm pipe, approximately 40? between manhole and 108? combined sewer.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ABF6F9E96DC394AD986931B668F73E605BA13DCE 96209~|~1~|~1~|~01/NFA~|~Roadway improvements to support an expansion by Rexarc International in the Village of West Alexandria, including construction of a new access road to the east of Rexarc to provide new access and connect Third Street and Main Street (SR-503), and improvements to existing service roads at Rexarc's perimeter.~|~~|~203E9990A81C7F357D3CA7FB4237407867929093 118110~|~1~|~1~|~01/MPO~|~Plan Split for MP STBG funding~|~05 - 4R Maintenance - Resurfacing~|~ECF1E06509CE32D4C5D544CA2ADBA2C65F90FAE9 109487~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~84D6922F3267A4449F8E5BCE7377ED1D13C2EC7B 116440~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in Portage, Stark and Summit counties.~|~21 - Safety~|~747CAFB150A385A607D6E4DBB0307023E1C9D865 112132~|~1~|~1~|~01/SAF~|~Safety related funds plan split~|~21 - Safety~|~34356F8B7B39FDC512A93EF936B6472CEBF02A9A 98143~|~1~|~1~|~01/NHS~|~NHS 80/20 Non-BR Eligible FAY-435-0.17 over US35~|~13 - Bridge Rehabilitation~|~650A2F5366A6D0CC8B930582A7E8AC0F5B669F2D 98143~|~1~|~2~|~02/STR~|~STP Rural 100% State Non-BR Eligible FAY-729-1.39 over Rattlesnake Creek~|~13 - Bridge Rehabilitation~|~75B758C24A7F574C61DD2254F5104CCF6831607E 101943~|~1~|~1~|~01/STR~|~Emergency culvert replacement on PIK CR 68 3.99~|~04 - Reconstruction - No Added Capacity~|~8D30D8540E3A1566573D765CB5CD93BAED68B3FE 125952~|~1~|~1~|~01/NFP~|~Plan split for applying pavement markings using state preservation funding~|~21 - Safety~|~E9E1849D934042E33C518D8E18D5231D4BD27769 107982~|~1~|~1~|~01/SAF~|~Repairs to an existing drilled pier retaining wall damaged during an ER event.~|~21 - Safety~|~6E08139E6351CB0B19A448517F5E25C834B64FD6 118767~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~2325DADE18CE81BB9EAD6535C78EBBDBBD92257F 96833~|~1~|~1~|~01/S>2~|~Pavement work~|~01 - New Construction~|~FBDF0A5958F96FDC85CF788947F7007C8D06F06B 96833~|~1~|~2~|~02/NFP~|~100% local cost items~|~01 - New Construction~|~C932139381B69D20A261CDAF17A964A0D83F08FB 96833~|~1~|~3~|~03/NFP~|~Split 3 for 100% GCRTA charges for signal work on E.55th at the RTA station.~|~01 - New Construction~|~884E0CE1279C3D0A930C57E15B540944E6668F0F 77920~|~1~|~1~|~01/IMS~|~Minor Rehab on GRE IR 675 that also includes safety upgrades, deck replacement, increasing vertical clearance and widening of the North Fairfield Bridge over IR675. Pavement limits are from SLM 9.48 to SLM 14.88~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1F80AE2654654139F0777BD92B87E67222E9964A 77920~|~1~|~3~|~03/SAF~|~Includes Costs associated with the traffic and safety improvements on North Fairfled Road. This improvement includes widening of North Fairfield Road, rehabilitation and widening of the GRE-675-1034 bridge on North Fairfield Rd over I-675, interchange intersection modifications, and other related work. Safety funds shall be used first, MVRPC funds shall be used second, and District Allocation funds shall be used third for this work. Safety funds are capped at $2.2 million. MVRPC funds are capped at $1,760,000.~|~21 - Safety~|~380A70135F9038FFCE5C9B56A0972ECE7E95E882 77920~|~1~|~2~|~02/IMS~|~Plan split for all interstate bridge work that is NOT associated with the GRE-675-1034 bridge.~|~13 - Bridge Rehabilitation~|~AB6798F5EC0DF27BA31FF3C620A64B8B040C460F 81605~|~1~|~1~|~01/ERD~|~Existing lanes to be widened to standard widths, drainage will be improved, signals well be upgraded and coordinated, turn lanes will be provided to improve traffic flow and bicycle lanes will be provided, and existing pavement and curves will be replaced between Graham Road and West Bath Road, in the City of Cuyahoga Falls, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~2C42CBDDF110ECD4E70E7B4C7A31E4D9E18C2F7B 81605~|~1~|~2~|~02/SAF~|~Existing lanes to be widened to standard widths, drainage will be improved, signals well be upgraded and coordinated, turn lanes will be provided to improve traffic flow and bicycle lanes will be provided, and existing pavement and curves will be replaced from West Bath Road to Steels Corners Road, in the City of Cuyahoga Falls, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~E95F2D12F5CA794FD5755D05B07634D5981AA90B 122375~|~1~|~1~|~01/NFP~|~Funding split for OPRA funded projects~|~44 - Other~|~5505E7910130064612DB0407EE36E8ACA1C51B8B 101758~|~1~|~1~|~01/BRF~|~Replace SFN 0432482 ATB Harpersfield Rd Bridge over the Grand River.~|~10 - Bridge Replacement~|~55A14C97358F8659DC64DD81AFF9F9549162A235 116736~|~1~|~1~|~01/NHS~|~Split for NHS route paving~|~05 - 4R Maintenance - Resurfacing~|~C2577B440188E51087A671A9DD42638A2FDA14F7 126126~|~1~|~1~|~01/CMQ~|~Plan Split for Construction CMAQ 80% federal/20% Local~|~28 - Facilities for Pedestrians & Bicycles~|~A8D4AE28564692F75C2B28329C9496FCD567D3F9 112725~|~1~|~1~|~01/IMS~|~Replace FRA-665-9.88 with box~|~10 - Bridge Replacement~|~D61166B1A7A282D1245C4F3DD600586A700A77E4 94120~|~1~|~2~|~02/STR~|~Bridge maintenance on SFN 7801505 TRU SR 5 32.56 over Stratton Creek.~|~~|~6AD256FD3115F952E94A28F6AE2D149395D0028F 94120~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 5 from 32.50 to 35.52~|~~|~B383F08AE85BCDC4A57EBDF2B28B73D1369F04EE 125424~|~1~|~1~|~01/NFP~|~PM FY32 plan split.~|~21 - Safety~|~4B81F8ECD407F5526C8324B810DA0A4C2A6AE052 100778~|~1~|~1~|~01/NFA~|~Resurfacing of bike trails in poor condition on the Troy Recreation Trail~|~28 - Facilities for Pedestrians & Bicycles~|~0EBE8A43662E5E8C407EC567D7AB9B481AA2B3BB 101245~|~1~|~2~|~02/NFP~|~Plan split for any work added by CSU~|~~|~63BF5B40E57814B94691DA91C975F902B38B019B 101245~|~1~|~1~|~01/NFP~|~Plan Split for work on raodways, drainage, curbs, and sidewalks on CSU's campus~|~44 - Other~|~E83D132B8B0264AB298CC873936B5A9BC4AEF906 98508~|~1~|~1~|~01/IMS~|~Plan split for all work associated with sealing interstate bridges.~|~13 - Bridge Rehabilitation~|~C506BC56F91A78865479B00BB8367DC1924526D3 94477~|~1~|~1~|~01/NHS~|~SFN 0600210, AUG 33-0442, Miami & Erie Canal - Rehab existing canal pipe with a structural liner.~|~13 - Bridge Rehabilitation~|~D60DF505D0A8BD8BFB8BC95E29BBFCFEC4741B45 101090~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~A759F5CAF05CF4A906001A648C7FD7E14B58FA9D 101090~|~1~|~1~|~01/NHS~|~AC Overlay with repairs.~|~05 - 4R Maintenance - Resurfacing~|~95AFBBE6B10723F5BAC7195578E3233258C3DA1F 101090~|~1~|~3~|~03/S<2~|~Placement of high friction surface treatment on east bound ramp from US 40 to SR 4~|~05 - 4R Maintenance - Resurfacing~|~E408BA8B4C53D4A9525ADE1F0ED550B7A11A5A97 101090~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~BECA301B9551149910EE0928B9F161D4A8384C66 123933~|~1~|~1~|~01/STR~|~Slope stabilization along on SR 60 in Coshocton County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CA583F4AD3C6C5055E8CA5DF1D27AA9BE10A2481 120121~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement~|~44 - Other~|~477FF5F502B444B72DE329039F345F6F64715EEB 119824~|~1~|~1~|~01/IMS~|~Plan split for interchange reconstruction~|~~|~E874E6F5F92712E09800A4F3E187E5C20D41BC6A 93015~|~1~|~1~|~01/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 33-17.44 to 24.86~|~05 - 4R Maintenance - Resurfacing~|~B984E68A8CBFB78321A261B7E8590B1F92D44E5A 93015~|~1~|~2~|~02/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge Deck Sealing along US 33~|~05 - 4R Maintenance - Resurfacing~|~00759908D5431E0EF502FFD050B8DED34CFA52F6 87629~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for replacement of RPM's within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F6A71BADBD7CB8A03595965237176F3E474659BE 101072~|~1~|~1~|~01/IMS~|~Pavement markings~|~21 - Safety~|~E4FC6AA683FBEE4A2C3B39ABBF6BB1E477049E49 96872~|~1~|~1~|~01/MPO~|~Mill 2", complete full depth pavement repairs, pave 3" asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~42FD27AD874931A94F1CCBDFA37C15E4DE8A9E25 96872~|~1~|~2~|~02/MPO~|~Urban Portion~|~05 - 4R Maintenance - Resurfacing~|~2BE27B80FA98A1D78656303C58DB5F0A600E60FA 96872~|~1~|~3~|~03/ENH~|~100% City Items~|~05 - 4R Maintenance - Resurfacing~|~7372AB52AB64D3DB3C0858EAFAC79B939A7975E6 88711~|~1~|~3~|~03/STR~|~District Wide bridge sealing for FY2017. This plan split for the rural locations. Actual bridges to be determined later.~|~~|~5445A40FFF78AC918450F4FCFABFEE8A231EB00D 88711~|~1~|~1~|~01/IMS~|~District Wide bridge sealing for FY2017. This plan split for the interstate locations. Actual bridges to be determined later.~|~47 - Bridge Preventive Maintenance~|~6F52CF8083A9198C3595823DF8B9312E97029809 88711~|~1~|~2~|~02/NHS~|~bridge seal the NHS bridges~|~47 - Bridge Preventive Maintenance~|~52B30597E75ADFDFB9430788CDFAB2B1B49C9DE0 95983~|~1~|~1~|~01/STR~|~"01/STR/PV/" District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus- SR 60.~|~05 - 4R Maintenance - Resurfacing~|~171CC464F33896F2B932515F81C4D9CFB824E4CA 95983~|~1~|~2~|~02/S5K~|~"02/SK5/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-60.~|~05 - 4R Maintenance - Resurfacing~|~65D19B3F4C57A5567CF61AA90534FE513267239C 116435~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~6EB9BDB46664CD84F46C2E3048A114E791E04680 90389~|~1~|~1~|~01/ENH~|~MORPC enhancement funding for multi-use path along Big Walnut Creek from Pizzuro Park Drive to Galloway Reserve.Gahanna is sponsor.~|~28 - Facilities for Pedestrians & Bicycles~|~879847F2822044D7B58EE2CC826E78EBB61F1238 79902~|~1~|~1~|~01/S>2~|~4805313 LUC SR51 6.65 Intersect: Ten Mile Creek~|~13 - Bridge Rehabilitation~|~BE57E3719AFDE4A769200F710D8179AC6501440C 124063~|~1~|~1~|~01/NHS~|~All work included in this plan split.~|~17 - Construction Engineering~|~FD9604ACF40C02177400418BFA141DB0DFA941E4 112874~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work.~|~05 - 4R Maintenance - Resurfacing~|~63B1EC9B44124171B674E0B4DC31350C407FC80F 120126~|~1~|~1~|~01/S50~|~Bridge Hit Repairs.~|~13 - Bridge Rehabilitation~|~951633C5D3577FD9B6068A6BD3C5D46E36680419 116398~|~1~|~3~|~03/STR~|~Chip sealing.~|~05 - 4R Maintenance - Resurfacing~|~1E057123367B61531520BAB39B716858B6108068 116398~|~1~|~2~|~02/S>2~|~Chip sealing.~|~~|~F8987D2B4F45BC8D539B26270950AC9EF90ED037 116398~|~1~|~1~|~01/NHS~|~Chip sealing.~|~05 - 4R Maintenance - Resurfacing~|~6059A01C688ACEEBC65BF7B7179185934750B77D 125430~|~1~|~1~|~01/NFP~|~HS FY32 plan split.~|~44 - Other~|~E353958FF425584DBA4E2DF4029A1717E49D36CB 91418~|~1~|~1~|~01/NHS~|~Plan Split for the NHS locations within the project: BUT-127, CLI-68 from SLM 20.3-20.48, and WAR-122~|~99 - State Preventative Maintenance~|~39B839CD7718C5099469DE8F0FCE4906936A6108 91418~|~1~|~2~|~02/STR~|~Plan Split for the rural locations within the project: CLI-22 from SLM 0-5.8 and 12.57-17.6, CLI-68 from SLM 20.48-23.32, CLI-380, and GRE-380 from SLM 0-6.38~|~99 - State Preventative Maintenance~|~25FA6868B0DF2C2AFFBDCF2FF1B7AA138F2E0380 91418~|~1~|~3~|~03/S>2~|~Plan Split for the Urban locations: GRE-380 from SLM 6.38-7.03~|~99 - State Preventative Maintenance~|~4181D52AFCB06D430FBE6EE40560418C8D6F99E6 119404~|~1~|~1~|~01/S5K~|~Covered Bridge Restoration ~|~28 - Facilities for Pedestrians & Bicycles~|~1CF266DF327A4211D28DC4AD7072B1530D01B348 121528~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E4E1B0F6445290287BE6E8E5911081B8A5D8FDE3 124514~|~1~|~1~|~01/STR~|~STP plan split.~|~04 - Reconstruction - No Added Capacity~|~2EFA83FE0B59AA61345CFDF11826C39A8835A417 98322~|~1~|~1~|~01/STR~|~HIG 50 7.42-11.50~|~05 - 4R Maintenance - Resurfacing~|~D6E50459D44D58F9A73E603AE36B2D7FE2E77A79 98322~|~1~|~2~|~02/S<2~|~HIG 50 11.50-11.85~|~05 - 4R Maintenance - Resurfacing~|~17DD654B2786D3C2CA1B95A1DAD5F0B968EC7B30 98322~|~1~|~3~|~03/NHS~|~HIG 50 11.85-12.27~|~17 - Construction Engineering~|~7CC73A8487B76E6ACD2DAE5832A3E091FF10B83C 98322~|~1~|~4~|~04/STR~|~Bridge plan split placeholder.~|~47 - Bridge Preventive Maintenance~|~CE97981DD6B4AF0E14B7D3A053F0443166568E51 105161~|~1~|~1~|~01/NFP~|~All work in this project. 100% state funds from the District Preservation Program budget.~|~44 - Other~|~8891779ED090DD773D7B8AF3741241BDD91AFA49 100639~|~1~|~1~|~01/S>2~|~Plan Split for roadway work in the Large Urban sections:CLE-126: SLM 0-2.16HAM-126: SLM 22.28-25.41~|~05 - 4R Maintenance - Resurfacing~|~F75769CD03ED88D66680E3BDFEE69DB26B5360FB 76413~|~1~|~1~|~01/NHS~|~Plan Split for TRU SR 82 from 14.08 to 17.47~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~31A4E823955C924558519A6F3116FFB9BC82EC43 76413~|~1~|~2~|~02/NHS~|~Plan Split for SFN 7804636, TRU SR 82 14.79 under North River Rd, SFN 7804660 TRU SR 82 16.30 under SR 82. SFN 7804679 TRU SR 82 16.78 R under SR 82, SFN 7804695 TRU SR 82 16.90 L under SR 82. SFN 7804709 TRU SR 82 17.16 CR under SR 82, SFN 7804717 TRU SR 82 17.20 R under Ramp G (EB 82).~|~13 - Bridge Rehabilitation~|~A8904710C6981218C0BCB26701F0E5FD6AD6CB27 119342~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~13AEC1A1DC3CE6CAB6E4F483AB9E9D70778B5B02 117356~|~1~|~2~|~02/BRF~|~Bridge replacement for SCI TR 100 1.63 (SFN 7333013)~|~10 - Bridge Replacement~|~3759EA3F81143C954B08A0295331645C027879B3 117356~|~1~|~1~|~01/BRF~|~Bridge Replacement (SFN 7332998)~|~10 - Bridge Replacement~|~9D946EDB5B47C3CC53F9BE1EDBEFF76104953EF3 120014~|~1~|~1~|~01/NFP~|~Resurfacing of parking lots operated by ODNR~|~05 - 4R Maintenance - Resurfacing~|~82DC43C2E15CB882121EE36AFE91E22A733ADF36 98250~|~1~|~1~|~01/NHS~|~Preventive Maintenance - Smoothseal: MED-224-0.00-6.25~|~05 - 4R Maintenance - Resurfacing~|~D88F940140A043A9C6C4062DDE62E0E6A1126F5A 98250~|~1~|~2~|~02/STR~|~STP Rural smoothseal: MED-42-0.00-1.89MED-42-7.12-14.40WAY-42-0.38-3.31WAY-539-12.74-13.43~|~05 - 4R Maintenance - Resurfacing~|~5FBFCBCDB49C04B93ED12EDF97E658C394E2B190 98250~|~1~|~3~|~03/STR~|~Minor bridge work associated with this project~|~13 - Bridge Rehabilitation~|~29EC324B3117A6AAC9C629CBDB3D90142FA3DF1D 98294~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7/4PS7(90% Federal/10% State) - No CAP - deck replacement on 1) 6001920 MUS IR70 11.44A Intersect: Ramp A Over McIntire Avenue; BR Eligible for Rehabilitation: Length=149 SD/FO(2) SR=76.0 DSR=6;~|~~|~A2DADEFFB1ACFA65B5382F5C8DFE80D0A6CB52A0 101896~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~A7C9EE76C5730D974B7590D332551F04649C9B0B 95059~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (90% Federal) / 4SS7 (10% State) - CAP = $300,000.00 for CO and $30,000.00 for CE - Rock scaling with installation of 650 feet of 50" CIP barrier on Gue-IR 77-14.07~|~21 - Safety~|~E15CB4DD6022F8C13A51EEFB8B058DDFDFDC202C 105869~|~1~|~1~|~01/SAF~|~Plan split~|~21 - Safety~|~1F97BEED7761AA99FA005F168454568EEB4E66D8 95637~|~1~|~2~|~02/S>2~|~CEAO funded STP project to reconstruct intersection of CR11/CR140.~|~~|~556E6039D15F4F276F936180B8F835C7DE24841B 95637~|~1~|~1~|~01/S>2~|~CEAO funded STP project to reconstruct intersection of CR11/CR140.~|~21 - Safety~|~61E3898E3E370497C19984983BD441D191258028 112406~|~1~|~1~|~01/SAF~|~CEAO safety funded item plan split~|~21 - Safety~|~F80BA7288AD2B5C188719D1F8EBB42C2E20A421F 79516~|~1~|~1~|~01/BRF~|~Replacement of the existing structure with a three span structure with roadway approach work and guardrail work. SFN# 0432954 over the Grand River.~|~10 - Bridge Replacement~|~4A8F93467B2580882173DA854C1BE9DD28D06055 117138~|~1~|~1~|~01/MPO/NFRA~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~CC3F007EC17CBE5E71CBAE92E690DEF23DBD71FE 112901~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~8B5A511B678B7C80DF0A205271ABDB71D99C8A18 97629~|~1~|~1~|~01/BRF~|~Replace MAR-TR 28D-3.78 (Dry Lane Rd S) structure over Clements Ditch SFN 5130603.~|~10 - Bridge Replacement~|~65F097B0A5BA7BB998E7C48479A04A344CBB1A5F 97629~|~1~|~2~|~02/BRF~|~Replace MRW-CR 30-6.28 (Mt Gilead-Iberia Galion Rd) structure over Tributary of Thorne Run SFN 5933056.~|~10 - Bridge Replacement~|~ABEBE089A34817EF0790FE8C86FB8320F4FA98C1 97629~|~1~|~3~|~03/BRF~|~Replace MRW-TR 50-1.72 (Chestnut Ridge Rd) structure over Tributary of Cedar Fork Creek SFN 5932866.~|~10 - Bridge Replacement~|~BF1024D3061F43ED32896922A1F1906569398FF0 90649~|~1~|~1~|~01/ENH~|~Constructing sidewalks along SR-3 (SLM 24.29 to SLM 26.67)~|~28 - Facilities for Pedestrians & Bicycles~|~9DBA0D3C01A0E8595A7D6DD9C5FC2DA1793ED88C 90649~|~1~|~3~|~03/SAF~|~100% City of Columbus for payment of excess materials~|~28 - Facilities for Pedestrians & Bicycles~|~BBB566469536B71A66A6D3B48990344690575D79 90649~|~1~|~2~|~02/NHS~|~D6 funding to correct drainage issue at bullnose of concrete median on FRA-3 just S of I-270.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E92E26B335F23FFCF7450E623B8457B0684E4013 100480~|~1~|~1~|~01/NHS~|~BRO 52 (0.00-4.25)~|~05 - 4R Maintenance - Resurfacing~|~1D5A8EF93A161CC7409C951A8EC132B31BCA3BAC 116168~|~1~|~1~|~01/SAF~|~Guardrail installation project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~43AE744D9B58C32CFB5B092996EE61D85E200AED 93553~|~1~|~1~|~01/SAF~|~Sign upgrade on loop ramps on or inside I-270~|~21 - Safety~|~68C3FDA3D1E365757205BEF3AF4FC8D6F7D8E606 117577~|~1~|~1~|~01/SAF~|~Pedestrian improvements only including crosswalks, sidewalks, RRFBs, curb ramps, etc. ~|~21 - Safety~|~B08FD24338DCB549BCD17BB784F8A715562ECEB6 117577~|~1~|~2~|~02/SAF~|~All other local roadway improvements~|~21 - Safety~|~C6C8B9803E27CCBF8A0234A1C9B8162336C84C54 97232~|~1~|~1~|~01/S>2~|~CEAO/FRA County funding for intersection improvement of Winchester Pike/Shannon/Ebright~|~21 - Safety~|~7126B8629BC14286283D04F0769447CBBD54B8B4 87408~|~1~|~1~|~01/CMQ~|~South Avenue Signals~|~21 - Safety~|~6EF42D46C377966EDFDD55D0CA247A5B76A69DBA 117213~|~1~|~1~|~01/NFA~|~MAP 100% funding~|~67 - Resilience Improvement - Transit or Port Projects ~|~F63751C90BF267D0330BFA97D3C96D61E5518092 117213~|~1~|~2~|~02/NFA~|~PROTECT funding with MAP match~|~67 - Resilience Improvement - Transit or Port Projects ~|~5A437FAD8FC355F01EEEEF60301C5987CDC817A1 114506~|~1~|~2~|~02/S5K~|~Plan split for the small urban section of CLI-730~|~05 - 4R Maintenance - Resurfacing~|~862426B224608EE1E322EDAEDC3B6A59FEA6876F 114506~|~1~|~1~|~01/STR~|~Plan Split for the rural sections of CLI-28 and CLI-730; including roadway and bridge locations~|~05 - 4R Maintenance - Resurfacing~|~234EA13C2FC0D904B46FC3A028157E20AD0B968D 116740~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7293A2CC0550B7B3B733B7DA997CF45B6898D3D9 94968~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~~|~74279F4DB0993DE93A30F2CD620E9B621DB1C635 114982~|~1~|~1~|~01/NFP~|~Reactive maintainance~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~25E210196DE04ADECEB666E3225CD0CB88FB1AAF 109791~|~1~|~1~|~01/S<2~|~Microsurface on: LOG-273 SLM 0.00 to 2.02 LOG-368 SLM 0.00 to 2.59~|~05 - 4R Maintenance - Resurfacing~|~8BFA06CCF4154E8910042965F951FB554774C840 109791~|~1~|~2~|~02/NFA~|~Microsurface on: LOG-273 SLM 6.46 to 7.71~|~05 - 4R Maintenance - Resurfacing~|~DD2E12AC69B35188E2DE0B7BD5FE1C3F4755449B 92760~|~1~|~1~|~01/NFA~|~Herbicidal Spray. 100% state maintenance funds. 01/NFA/OT/State~|~21 - Safety~|~7808B095E7C587C0683A5AE96F16672617A20C41 113958~|~1~|~1~|~01/MPO~|~Resurfacing eligible items~|~05 - 4R Maintenance - Resurfacing~|~4E71A84A7F70715BDB92F27B32F288425917D1E0 119058~|~1~|~1~|~01/IMS~|~Plan split for project to Paint the HAM-71-1530 bridge that carries Zig Zag Rd over I-71 and the HAM-17-1581L/R bridges that carry I-71 over Pfeiffer Rd. Rehab will include other repairs such as patching and sealing.~|~13 - Bridge Rehabilitation~|~B9DD5AF54B5DBACAF6D923475F32A4445AACAAF2 113399~|~1~|~1~|~01/NHS~|~Construction on an access road to the Barker house. Work includes new alignment and minor drainage work. WAS 7 32.39~|~05 - 4R Maintenance - Resurfacing~|~9BB6EC57E69FD07E5FCDEE2A432745628CF154B9 125452~|~1~|~1~|~01/NFP~|~Guardrail maintenance.~|~21 - Safety~|~BA93DA1CC30C7F868D93A1AFA9B6B1AF179A35F1 121408~|~1~|~1~|~01/IMS~|~Plan Split for noise wall repairs along the interstate locations~|~04 - Reconstruction - No Added Capacity~|~66A19F58DFCB6286BA7A4D4063510C482172C277 92674~|~1~|~1~|~01/MPO~|~Resurfacing from Norton Road to Terex Road (SLM 10.41-11.58)~|~05 - 4R Maintenance - Resurfacing~|~CD1974807B6970D21880F150548CAFE2D20EF413 93306~|~1~|~1~|~01/SAE~|~Adding battery back up to signalized intersections in Ashtabula and Trumbull counties on US20, IR90, SR193 and SR45~|~21 - Safety~|~61BF4CB882E0CBCD46EC5C4E6D9655DA78D760A7 102168~|~1~|~1~|~01/NFA~|~The City is constructing road improvments and signalization to the plan entrance at State Route 55 and Fenner Road.~|~01 - New Construction~|~0BF6D966DD700C47E89111A235877C29F988707F 96291~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 329 11.93, SFN 0503541. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~4938D860F082BFC897E0676FA31DDCFA3F69C16D 119055~|~1~|~1~|~01/S5K~|~Resurfacing GAL-160-3.25-3.70 and GAL-160A-0.00-0.74. Urban federal aid funded 80 Federal/20 State. ~|~05 - 4R Maintenance - Resurfacing~|~03B679C3E568647268037CD32F6CC885AD57AE5F 119055~|~1~|~2~|~02/STR~|~Resurfacing project using a microsurfacing treatment. GAL 160 3.70-10.43. Rural federal aid funded 80 Federal/20 State. ~|~05 - 4R Maintenance - Resurfacing~|~EDAC5981E937E9ED2905E16CF1ABD72FE2AF9FC4 119055~|~1~|~3~|~03/SAF~|~Sidewalks along WAS-550 and WAS-339~|~21 - Safety~|~834D7FBE48F5408DCC87E00FAE4F87505D0AAEC2 96282~|~1~|~1~|~01/NFP~|~Northwood full service maintenance facility.~|~01 - New Construction~|~E92835C933BEA610C7798A2147709BDB27BE4230 94276~|~1~|~1~|~01/MPO~|~Resurfacing of County Route 15 (South Arlington Road) from SLM 0.00 to SLM 2.06, in the City of Green, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~F8FCC521B0E778F5A1567061C45D91BFCA0D9176 105850~|~1~|~1~|~01/NHS~|~Lining of MAR-23-1.523 culvert~|~04 - Reconstruction - No Added Capacity~|~02B99FCEB15AA1EE1ECCFB598F708B7B50D12B09 90289~|~1~|~1~|~01/S>2~|~URBAN PAVING PROGRAM Pavement planing and resurfacing with Item 446, Asphalt Concrete on MOT SR 741 from SLM 3.62 to 4.56.~|~05 - 4R Maintenance - Resurfacing~|~48B28D046CBCAC718537D67D0A06B16849515E31 90289~|~1~|~2~|~02/SAF~|~Installation of curbs, sidewalks, and drainage 0.01 mile North on State Route 725 to Miamisburg North Corporation Limit.~|~21 - Safety~|~D266B0C71257B7D8A8EAE04A71BF79CB7E8DDF48 98817~|~1~|~1~|~01/BRF~|~Bridge Replacement--Bowman Street over Touby Run.~|~10 - Bridge Replacement~|~40DC6B108D064A288D26E30D701E4657E4E4E9DC 101548~|~1~|~1~|~01/NHS~|~Landslide Repair, WAS US 50 5.50. DSR WAS-004 ER funded, 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~10BE33BA05C263E8F9A4E2F8AA5A874552AA797C 109753~|~1~|~1~|~01/S5K~|~Resurfacing and related roadway work items on LIC-657.~|~05 - 4R Maintenance - Resurfacing~|~80CB8B61A99EFD64FC443977888C50E7D273934E 109753~|~1~|~2~|~02/NFA~|~Resurfacing and preventative bridge maintenance on LIC-657~|~05 - 4R Maintenance - Resurfacing~|~6B763C4182416CEB38C97898ABAE9B90861A0BAD 95489~|~1~|~1~|~01/ENH~|~Champion Creek District Bicycle & Streetscape enhancements on South Cour Road, LaFayette Road, South Broadway Street and Grant Street.~|~28 - Facilities for Pedestrians & Bicycles~|~287F45C2657650170CCBC1E100D34906432D6A63 99818~|~1~|~1~|~01/S<2~|~SCI US23 Grant Bridge~|~47 - Bridge Preventive Maintenance~|~1335311B87FCD6CDF0D66C4EEB82B91B56A5B6C6 124493~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement.~|~44 - Other~|~ACDB72E647975EE9BF44E6C4CA739EBCA40BC500 116794~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~6481F29A5FD60DB215E73C45C00417EB75CE1F57 112186~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at the STA IR 77/US 30 interchange.~|~21 - Safety~|~F3BA18F5D575BEF6A96223BA21117E796C32D603 87681~|~1~|~1~|~01/CMQ~|~80% Federal / 20% Local MPO CMAQ funding for the City of Solon's city-wide signal upgrading.~|~24 - Traffic Management Engineering - HOV~|~46D4B81DEE999023E29424E2AD91F99C3F2F5554 87681~|~1~|~2~|~02/CMQ~|~100% local participation for work not eligible for CMAQ funding.~|~24 - Traffic Management Engineering - HOV~|~A6526E1C8CF142F2523C90ECE7A042138FC03E5A 126979~|~1~|~1~|~01/SAF~|~100% funded for upgrade of guardrail on various county roads~|~21 - Safety~|~256BCA1594BDADBAE24A7B51F0CFD623AA3C3973 116324~|~1~|~1~|~01/STR~|~Plan Split for chip sealing on rural locations~|~05 - 4R Maintenance - Resurfacing~|~A2875E01EF85923CD62D905903D36C140F5A1354 112961~|~1~|~1~|~01/STR~|~Overlay on HIG 138~|~05 - 4R Maintenance - Resurfacing~|~775315F73B528BC7B8D2FB3F910179327A3D7284 115014~|~1~|~1~|~01/STR~|~Superstructure replacement.~|~~|~21B6D5780C098E67655F216274E4D49A5B3A7A77 111105~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of the bridges at Kno-US 36 32.68; Kno-US 36 32.82; and Kno-US 36 34.28;~|~10 - Bridge Replacement~|~5511BA14E5C6BE912B66F2AAB53D139F15E708D5 92358~|~1~|~2~|~02/NHS~|~NHS Route BEL SR7 Sealing of Mine opening. GSMP Funds.~|~17 - Construction Engineering~|~18D1BA377BC0F2E4A572AA4B5063D973F00F3CE3 92358~|~1~|~1~|~01/NHS~|~NHS Roadway BEL SR7 Mine Opening sealing project. GSMP funds.~|~04 - Reconstruction - No Added Capacity~|~DD317F20E375FA6C5B704C4DB33FC25126E529DC 123459~|~1~|~1~|~01/NFP~|~CO CE FY30~|~17 - Construction Engineering~|~EEAE2488476089A4A02E0CAE64D8AA98E28268B7 94506~|~1~|~1~|~01/STR~|~Replace 30" culvert at WAR-741-1227, regrade slopes and install catch basins. Replace or rehabilitate the CMP arch at CLI-73-0356. Replace or line the 60" CMP arch at CLI-22-0049. Pave the invert of CLI-28-1538 (60" CMP) and cleanout the vegetation and sediment buildup at inlet and outlet channels. Pave invert of CLI-28-1450 (60" CMP) and repair undermined concrete apron. Sprayline culvert WAR-48-0348. Replace 52"x30" CMP at WAR-741-1138.~|~04 - Reconstruction - No Added Capacity~|~2F8EBA45A1853F26FD10C658F96B29F2FDC386D2 94506~|~1~|~2~|~02/S>2~|~Replace WAR-123-2703 small culvert.~|~04 - Reconstruction - No Added Capacity~|~7ED2F6121D5C71DB391FC9E2D2F0611597F44C9F 104243~|~1~|~1~|~01/S>2~|~Split for paving on the urban system.~|~05 - 4R Maintenance - Resurfacing~|~E2E699508DC0FA7D1436E4B269AF730256F0AD73 104243~|~1~|~2~|~02/NFP~|~Work not eligible for urban paving funding~|~05 - 4R Maintenance - Resurfacing~|~26AAF70E6E528F51355037E735E510DBC86ADBE1 100439~|~1~|~1~|~01/NHS~|~Deck Sealing FY 196601596 PIK 32 13230 L 6601626 PIK 32 13230 R 6601669 PIK 32 13740 L 6601677 PIK 32 13740 R 6601693 PIK 32 13960 L 6601707 PIK 32 13960 R 6601723 PIK 32 14330 L 6601731 PIK 32 14330 R 6601790 PIK 32 17650 L 6601812 PIK 32 17650 R 6601871 PIK 32 15740 L 6601901 PIK 32 15740 R 6601960 PIK 32 20140 L 6601979 PIK 32 20140 R 6601987 PIK 32 21280 L 6602010 PIK 32 21280 R 6602045 PIK 32 22610 L 6602134 PIK 32 22610 R 6602169 PIK 32 24150 N 6603467 PIK 32 2470 L 6603475 PIK 32 2470 R ~|~13 - Bridge Rehabilitation~|~223543BE342DA77493C3D0A6BC6809B5E1B1954E 111562~|~1~|~1~|~01/BRO~|~Muni-Bridge funded items~|~10 - Bridge Replacement~|~814F3B8C83CA31D2D6196EDBDA17180A88EF435C 118612~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~16658CAEB70AD00C5B3DAED65C75689ACE2EF97D 100525~|~1~|~1~|~01/STR~|~PLan Split for all raodway work on the project on SR 131 in Clermont County from Goshen Road to the Bornw County Line.~|~99 - State Preventative Maintenance~|~52971EE8E4B07425CAC126F2B2DD377159A67BB4 126053~|~1~|~1~|~01/NFA~|~Bridge Replacement project. NOB CR 9 0.01, SFN 6130208~|~10 - Bridge Replacement~|~865D1429A1FC7A8B8D30664A2FE33B3ADFCF1106 116754~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8C9357E530253C074B8BE6EF99F827C137BBC3C8 116754~|~1~|~2~|~02/S>2~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~A108709851D3A45DB9D367AAEDE83E0562F93AEA 114272~|~1~|~1~|~01/IMS~|~Mowing contract~|~99 - State Preventative Maintenance~|~C2BEECB8E0AC09D0A16B37778B1DF9FB76B78958 124520~|~1~|~1~|~01/NHS~|~rockfall plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~586BB3611E101C11E9322233B3531198A5E2A387 126152~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~1CCC7182315126B962C324BA2459294F1D5C1A7C 123882~|~1~|~1~|~01/IMS~|~Plan split for bridge deck replacement on the interstate system~|~13 - Bridge Rehabilitation~|~2E4C2F973B008272CF8948F69C5748A89FE9F108 91606~|~1~|~1~|~01/BRO~|~Replace deficient bridge deck with limited pavement work between bridges and limited pavement work in North and South approaches to the project. MOT 75 10.44 includes structural steel repair for intermediate joints.~|~13 - Bridge Rehabilitation~|~1E8EC414FDFECCBB2B02BC12F9A5379CC7580C86 91606~|~1~|~2~|~02/IMS~|~Replace deficient bridge deck with limited pavement work between bridges and limited pavement work in North and South approached to the project. SFN 5707080 - MOT IR 75 10.78~|~13 - Bridge Rehabilitation~|~0959791F7F9B607344C259781AB2ADDB7079E44D 91606~|~1~|~3~|~03/IMS~|~Roadway/Paving related items (ramps, median barrier replacement, Texas turnaround related to the bridge work on IR 75 - Paving the Edwin C. Moses interchange ramps - Guide sign replacement along Edwin C. Moses Blvd.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EEA25AF37CD7919A978F66E37FCAAC0C4472E322 91606~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4157ABE098AFB44FDD1AAEA0F13E9A0F2E27D96F 101144~|~1~|~1~|~01/SAF~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide.~|~44 - Other~|~AD37FB6B41C3A2F14C2066F9A34C5AD0C9DCEDFD 101144~|~1~|~2~|~02/SAE~|~100% Safety plan split for New Signal at Woo-25 and Five Point Road~|~21 - Safety~|~ADC2EBE0CCF7697CBF95A0DA7040C6355FC8A81D 105763~|~1~|~1~|~01/MPO~|~Widening the roadway to increase lane widths, mill and fill of pavement with spot repairs where needed. Installation of a retaining wall where a slide exists on the east side of the roadway, installation of sidewalk where it currently does not exist, and construction of a shared use path from South Filview Circle to Wesselman Road.~|~21 - Safety~|~71C29EFA298B0A14D010A4C87DB68B396E39D3B7 105763~|~1~|~2~|~02/MPO~|~Plan split for TA eligible work, i.e. construction of sidewalk and multi use path.~|~28 - Facilities for Pedestrians & Bicycles~|~EBD1C5171C0C5A7971AEB80B2700D87B90B7A590 100935~|~1~|~1~|~01/STR~|~Microsurfacing of ATB SR 45 0.00 to 1.87, ATB SR 307 14.25 to 17.07, TRU SR 45 21.14 to 23.76 and TRU SR 88 0.00 to 2.99.~|~05 - 4R Maintenance - Resurfacing~|~4C0574570ACE1552BC6B9BB53E1DBAD8B56F45D2 115633~|~1~|~1~|~01/SAF~|~Raised crosswalk and curb bump outs at Harrison and Kling~|~21 - Safety~|~D6A5EB034DC29F858B6AB560581B159D93ED348A 115633~|~1~|~2~|~02/SAF~|~Installation of raised crosswalk and bump-outs on Harrison Ave. at Ruehlman Pl and on Central Ave. at W 8th St. Includes new curb ramps and drainage improvements as needed~|~21 - Safety~|~D894C995860D9B99B34296279F4F87B1C0FD53E4 105566~|~1~|~1~|~01/S<2~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~B1207A428AA11C9F3A6C83FDBD9FC0BFB927E51E 116954~|~1~|~1~|~01/S5K~|~Overlay bike path~|~17 - Construction Engineering~|~B2767B1A7362FBE1718C7C7D4D0DC8C61B35ABC7 91728~|~1~|~1~|~01/BRO~|~Replace SHE 75 overpass with insufficient (non-standard) vertical clearance in advance of a major rehab of Interstate 75 on SFN 7501447 SHE IR 75 0102 on CR 132 East Lockington~|~13 - Bridge Rehabilitation~|~626AC0CE9F0D62A513EA631F711F0007ABB309C1 123485~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~16AB68D19F5F8CA67820EADC25249526CCCBF0EB 115932~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~9D6EF59D41B4BAFE4CA703A4C501AC70568AD853 92707~|~1~|~1~|~01/MPO~|~Highland Ave. CR 515 0.00-0.36 and Diamond St. CR 513 1.00-1.55~|~05 - 4R Maintenance - Resurfacing~|~970448CA8F34D69CCDAD22FA84E590E389573E93 113778~|~1~|~1~|~01/NHS~|~Rockfall repair project. WAS 7 39.12. Work includes rock bolts and shotcrete.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~35F4B8D8B6E1A8BFCF24203F29F057D8DDB9617B 107226~|~1~|~1~|~01/CMQ~|~Upgrade of 10 signals within the Village of Poland.~|~21 - Safety~|~CB0F2A9BB886FCEE60131B104A29DEC49F6B5CD8 106994~|~1~|~1~|~01/STR~|~GSMP slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F894BF60AF47C2CC1C3A67798BD0E19608344671 112878~|~1~|~2~|~02/STR~|~Replacement of conduit crossing (CFN: 1801382) & catch basin at SLM 11.38~|~04 - Reconstruction - No Added Capacity~|~2A851924793AA2711551652B9336BB9D5F143637 112878~|~1~|~3~|~03/STR~|~Replace UNI-739-0900 (Over Brush Creek) with Box Culvert.~|~04 - Reconstruction - No Added Capacity~|~77383D1F86DAEE5CBB8BA3CB92F4B053547AF463 112878~|~1~|~1~|~01/STR~|~UNI-739 from 6.21 to 14.27; reconstruction of pavement, bridge deck sealing, upgrade guardrail and other miscellaneous work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AF91D2EDC919944F1FD4BB9FD2349BF2B2233956 88749~|~1~|~1~|~01/IMS~|~Priority System preventive maint. on TUS-77-7.55 to 12.30 ; includes mill and fill of surface course only~|~05 - 4R Maintenance - Resurfacing~|~EAEBB3AD769254EDD9F29CAE5317457A0488297A 101950~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EBF37988824AFA28C486FF5155AFF8C8F1BCECE9 97970~|~1~|~1~|~01/NFP~|~Concrete pavement repairs for the project funded at 100 state~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E74954CBF988F17A8A78D087F7F18BBDEDAB083 115979~|~1~|~1~|~01/STR~|~Profile improvements on CR 18 in Logan county~|~44 - Other~|~4845FEC1BFCB71A55FDDB92AAAF51D74062A1524 102124~|~1~|~1~|~01/STR~|~Pavement repairs and resurfacing from SLM 4.99 to 5.31~|~05 - 4R Maintenance - Resurfacing~|~7315FE9A8FBE114A90D662A6BA9E7A7E3BBFC472 102124~|~1~|~2~|~02/STR~|~Upgrade guardrail, construct roadside ditches, replace culverts and construct retaining walls to alleviate riverbank erosion at various locations from south of Hyatts Rd (SLM 4.99) to Bunty Station Rd (SLM 8.38)~|~04 - Reconstruction - No Added Capacity~|~D13DD245C3C395B81A76DAE710688AE3BA2FC78B 102124~|~1~|~3~|~03/S>2~|~Upgrade guardrail, construct roadside ditches and replace culvert at various locations from Bunty Station Rd (SLM 8.38) to SLM 8.53~|~04 - Reconstruction - No Added Capacity~|~E9AC2CE2F433F4BB9918EB5F8D2D30D9A58E3C39 89034~|~1~|~2~|~02/ERD~|~Plan split for Franklin Ave enhancement work.~|~31 - Landscaping & Other Scenic Beautification~|~5E94909D0C3308FA033E41B1CA90A32F4AF7BA77 89034~|~1~|~1~|~01/CMQ~|~Plan Split for shared use path work along the Irish Bend hillside between Detroit Ave and Columbus Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~D5F37117154468757747635802DF677C6B3E04C6 89034~|~1~|~3~|~03/NFP~|~Plan split for non-eligible items at 100% local cost.~|~28 - Facilities for Pedestrians & Bicycles~|~AFD6D47BBCC795A126681B2827C16A016F4453DC 106205~|~1~|~1~|~01/NFP~|~Lighting improvements to the MAH IR 680/Indianola interchange (base bid) and MAH IR 680/Shirley Rd (Alt Add).~|~21 - Safety~|~A90373F17D3EEA2131CF27C1FF55890E7994C633 100669~|~1~|~1~|~01/STR~|~Chip sealing COL-164 and COL-170.~|~05 - 4R Maintenance - Resurfacing~|~2174BE4150CD5B89FD52C6E20C8D6DDA3492FBBA 106113~|~1~|~1~|~01/NFP~|~Landscaping~|~17 - Construction Engineering~|~FFF194C7BA0EEDA70477DA687DCE3F48BBE6ACEB 104882~|~1~|~1~|~01/NFP~|~D09 FY23 RPM.~|~21 - Safety~|~7652420F3420CFD829DACFDDB629FB33A716FB80 112421~|~1~|~1~|~01/IMS~|~Fine poly AC overlay on: MOT-75 SLM 0.00 to 3.92 MOT-675 SLM 0.00 to 4.00~|~05 - 4R Maintenance - Resurfacing~|~4227B7B6D724F9B813DBEAFC6527F20D7FD928A3 98022~|~1~|~3~|~03/S5K/LANC~|~Resurfacing and related roadway work within city of Lancaster.~|~05 - 4R Maintenance - Resurfacing~|~DE660936C1B137FAF0A657B78EA389685FBCA690 98022~|~1~|~1~|~01/STR~|~Resurfacing and related roadway work outside of corporation limits for City of Lancaster and urbanized boundary.~|~05 - 4R Maintenance - Resurfacing~|~8CBFF664F241720F634D57944E637D1FF9337250 98022~|~1~|~2~|~02/S5K~|~Resurfacing and related roadway work outside of corporation limits for City of Lancaster and urbanized boundary.~|~05 - 4R Maintenance - Resurfacing~|~DA94E9E7387D0A5D6522CDEE6CAD48F97D5DCDFB 98022~|~1~|~4~|~04/S5K/LANC~|~Reconstruction of curb ramps throughout project area. Minor widening at Fai-22/188 intersection.~|~05 - 4R Maintenance - Resurfacing~|~BCDA66A6B647320E4C1C8C936530A75B50254AC1 97739~|~1~|~1~|~01/NHS~|~SFN 4600185, LOG-33-0397 on Slough Ditch - replace deficinet structure with new structure. Investigate us of precast structure.~|~10 - Bridge Replacement~|~F6BB37CF3C766320C09D72F2A0D2B009EC4A0ADC 111496~|~1~|~1~|~01/NFP~|~All work is in this plan split.~|~10 - Bridge Replacement~|~5B79E4B038A6045C6D0AEC4790B58BC23F67C8AB 94379~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~685E58AA17F068802849EF718A2C829DA64A9B70 111087~|~1~|~1~|~01/SAF~|~Demolition of 2 houses and tree cutting~|~21 - Safety~|~A55B46E597356EBE93CCC58D260086EFE44F6882 122895~|~1~|~1~|~01/BRF/MILL~|~Bridge preventive maintenance, work TBD.~|~47 - Bridge Preventive Maintenance~|~835C07D305D0DA84B6F865560A01B0DEA13248D0 116948~|~1~|~1~|~01/SAF~|~MRG CR Guardrail FY 2025~|~21 - Safety~|~09A578504930912E9B0A83441A9AFB1BE3D74C48 95486~|~1~|~1~|~01/MPO~|~Tentative split for FRA County resurfacing~|~05 - 4R Maintenance - Resurfacing~|~CE8EBD5571E2053B500B9E379ACEFD3181458A24 88574~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete on AUG SR 66 from SLM 3.41 to 4.58, segment length 1.17 mile, total lane miles 2.74.~|~05 - 4R Maintenance - Resurfacing~|~EB080AE5089FAA8A5E6C29E8791DD1450E10D9FC 106641~|~1~|~1~|~01/S<2~|~Correct the lack of adequate pedestrian crossings along the project route, and signalization at the intersection of SR 118 and Vine Street. Also correct the lack of street lighting. Add audible warnings at SR 118 and SR 219.~|~28 - Facilities for Pedestrians & Bicycles~|~08584AEFA8BEED71CE109C42D8F420054D96D154 111175~|~1~|~1~|~01/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Backwall replacement on SFN 4500873~|~13 - Bridge Rehabilitation~|~2846FF1CC61139F6ACE6FE0CB6108C0B29AF233A 93885~|~1~|~1~|~01/NFA~|~Bridge replacement project. HOC 374 21.98, SFN 3704114. Not on any federal aid system. Funded 100% state.~|~10 - Bridge Replacement~|~7B6D60722A791E1C01EC37C1AAB6B2C5F46F3689 93885~|~1~|~2~|~02/STR~|~Pave invert of HOC 93 19.75, SFN 3702499. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~E8E85107E39004F26D6F47824194397DC02EFA89 126356~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~DD0DACF71FAB3DBC1FB215FF808815E232ED8308 93017~|~1~|~2~|~02/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - Guardrail Replacement at Gue-IR 77 & SR 541 Ramps~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A703E0C8177159C1A7EE93712F3AAE0780A00298 93017~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - Resurfacing with related work on Gue-IR 77-17.70 to 23.44 and Gue-541-8.32 to 8.66~|~05 - 4R Maintenance - Resurfacing~|~B0D01D8968695B6948D41EC7D77495FB7A8C1ED7 93017~|~2~|~4~|~04/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - Replace deck, backwalls approach slab, paint, and bearings on 1) Gue-IR 77- 20.67L SFN# 3003450 L=115; SD/FO=(0); SR = 89.1; DSR = 6 - Not BR Eligible for repair; 2) Gue-IR 77- 20.67R SFN# 3003485 L=115; SD/FO=(0); SR = 89.1; DSR = 6 - Not BR Eligible for repair; 3) Bridge painting on Gue-IR 77- 16.76 SFN# 3003361 L=240; SD/FO=(2); SR = 67.9; DSR = 6 - BR Eligible for repair;~|~13 - Bridge Rehabilitation~|~2BC58981B7AA0716D616279676160467E511B608 93017~|~1~|~3~|~03/NFP~|~District Lands & Building Maintenance LBM7 (100% State) - Plan Split for resurfacing the North Salem Outpost~|~44 - Other~|~D6DA2347EB56B1D60FCCD9B993CE8C2595DBBB93 87671~|~1~|~1~|~01/STR~|~slide repair at WOO SR64 11.54-11.55~|~44 - Other~|~DA4B458C7CEA45A23A21D200C7E4803247462276 100423~|~1~|~1~|~01/STR~|~HIG 73 (15.34-23.48)~|~05 - 4R Maintenance - Resurfacing~|~C8583AEA5B2D06518FBC5569365281EF4502A5D3 101891~|~1~|~1~|~01/SAE~|~Add plan split.~|~~|~E802C4B3BC5CB29C874A319F54BDF293285F96F5 103507~|~1~|~1~|~01/NHS~|~plan split for Urban paving funds covering the top 3" of paving from on Luc - 25 from 05.250 to 06.980.~|~05 - 4R Maintenance - Resurfacing~|~3296FF65B2C538F2EB23DF056D7C3EB1FF5C85F8 103507~|~1~|~2~|~02/NFA~|~100 City plan split will cover all other work not included under the Urban paving policy.~|~05 - 4R Maintenance - Resurfacing~|~CDC96FF5E066227897E0245CFFF1E1BBDD5DFA85 115875~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~13 - Bridge Rehabilitation~|~CE7C2993E8F7A8B2913FC3DE6427972DB6F6C836 22077~|~1~|~1~|~01/BRO~|~Plan Split for SFN 7747195 Summit Road Bridge over Wolf Creek~|~~|~4273DE69AA910AC82B8D94F150497E7B2F6DCE1C 95780~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 4.339~|~05 - 4R Maintenance - Resurfacing~|~CCC7E74E40F0361632F7FE68C48CACCC65BA2644 95780~|~1~|~2~|~02/S<2~|~from SLM 4.339 to SLM 7.085~|~05 - 4R Maintenance - Resurfacing~|~AB08D63EC62AFBDF2B153C7384E7BBC174064E58 95780~|~1~|~3~|~03/BRO~|~Bridge asphalt overlay~|~05 - 4R Maintenance - Resurfacing~|~A5A0DB168E0DE1C2AA71C03F6EB052F959724FA4 121525~|~1~|~1~|~01/SAF~|~Polyester Pavement Markers~|~21 - Safety~|~C4794D7841D139E1855A47E7BCD8A919AF16656E 114993~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~~|~39C25B113801563EEC330B0D186C03C2064A4C12 105155~|~1~|~1~|~01/IMS~|~Plan split for sign repair on the interstate system~|~44 - Other~|~964D11EEEA1E9E3F1565940CB92429B9F7075DE1 126716~|~1~|~1~|~01/NHS~|~Plan split for all work on Sr-2~|~04 - Reconstruction - No Added Capacity~|~5713736926E5F890FF80F81933890683C1D6C155 117246~|~1~|~1~|~01/SAF~|~All safety work associated with moving the ditch, extending culvert, replacing guardrail, etc. ~|~21 - Safety~|~1FA9603A4BBF5B3536CB3E200C74F5DC22FED561 88516~|~1~|~3~|~03/BRO~|~Bridge on FUL-64 @ SLM 0.48~|~13 - Bridge Rehabilitation~|~A67C58A05CF0074DA66A12E1B4E2C9D28493D4EE 88516~|~1~|~1~|~01/STR~|~District Allocation (Rural) FUL US20A from SLM 23.94 to SLM 24.86 Rural~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A576DF8F09DD75597272CF4823245819E69D9660 88516~|~1~|~2~|~02/S>2~|~District Allocation (Urban)FUL-20A from 24.86 to 26.04 and FUL-64 from 0.25 to 1.71~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~08D119448EA09A203C30F039D6FA07A1AC6AFFD1 88516~|~2~|~4~|~04/SAF~|~Safety funding: FUL-20A-26.04 to 26.27 and LUC-20A-0.00 to 0.18 Urban~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CCEB3808225330E81EE31E2B341C7A96E2F71762 87299~|~1~|~1~|~01/STR~|~general system resurfacing; includes pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~2B980CD4F2967E4A1E61440BAD0E184D2C52AB81 93875~|~1~|~1~|~01/SAF~|~Signal replacements at three locations in Trumbull County, Ohio. Located at TRU-SR5-1.61, TRU-US62-4.85, TRU-SR305-10.73.~|~21 - Safety~|~93EF3E30B47284F9452590816AB0F91330BDF22A 94045~|~1~|~1~|~01/IMS~|~Maintenance contract for sign structure repairs.~|~44 - Other~|~602B728FBBF1CF57FE5BEEE6506699564AFFC9F4 108867~|~1~|~1~|~01/SAF~|~Install high friction surface treatment on BUT SR-122 and various ramps at GRE-35/675 interchange~|~21 - Safety~|~F3AA815F65CD1825D15A574E900628E405841592 90704~|~1~|~1~|~01/MPO~|~widen old LUC US 24 9.63-10.76 - widen to 3 lanes old US-24 from South St to Waterville-Monclova Rd in the Village of Waterville~|~03 - Reconstruction - Added Capacity~|~B756F2096DF54EC3E9AEA3AEAB4FF62908474264 91815~|~1~|~1~|~01/NHS~|~Interchange highway lighting upgrade at COL-7-0.59 (Clark Avenue), COL-7-1.27 (SR 39 Aten Street), and COL-7-2.75 (SR 45) using district's system preservation funds~|~21 - Safety~|~49724D05AA0D08F0962907A175EB178EA028BC92 122353~|~1~|~1~|~01/CMQ~|~Citywide traffic signal upgrade at 5 locations using CMAQ funding.~|~21 - Safety~|~59A8F4E08101D22C5BB93A92D97D4C1B501E9B38 122353~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~21 - Safety~|~C2AFF9C80ECC560DCDEB8347F72368A1B0915109 124942~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on the interstate system with district preservation funding.~|~05 - 4R Maintenance - Resurfacing~|~953A49256387C9B3EFFEE3F6311C92ACF4F53296 120683~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation ~|~13 - Bridge Rehabilitation~|~331026246EA0D513137B214DAB4820EA6AA07FDF 101523~|~1~|~2~|~02/SAF~|~100% 4PS7 for New Signals at ASD-42-5.44 and MED-57-2.53~|~21 - Safety~|~A2786F3CF8D13B5EB4A464B555A6508FF9239719 101523~|~1~|~3~|~03/SAF~|~100% City of Ashland for Signal Preemption on ASD-250~|~21 - Safety~|~298A4D5D90CD58D00D63FFBE2F52696D7A216D05 101523~|~1~|~1~|~01/SAF~|~Priority 1: 100% Safety Funding for Battery Backups and Traffic Signal Upgrades on ASD-250 at Sugarbush and George Rd. Capped at $33,653.Priority 2: 100% 4PS7 for Traffic Signals Upgrades on ASD-250 at Sugarbush and George Rd.~|~21 - Safety~|~A76E9A563A6901B7ACF65C70798D702BFCA554CD 123716~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with / without repairs on various priority system pavements in District 3~|~05 - 4R Maintenance - Resurfacing~|~671C877336A21C1AAE1B379AA5458A2D292C09CE 112952~|~1~|~1~|~01/S<2~|~Marysville Urban Area Plan Split: UNI-36-13.17-13.86~|~05 - 4R Maintenance - Resurfacing~|~79A8E9E98A744026BA76F51B1015B74A9FD2D26C 118713~|~1~|~1~|~01/S>2~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~9E618BFD80435C0D17F9E0389D60D8C81D083558 124397~|~1~|~1~|~01/NFA~|~Added split to rebuild portion of the Ohio to Erie Trail in the City of Westerville.~|~28 - Facilities for Pedestrians & Bicycles~|~484F3D3BE38121CEB66DD22CD5C13F4DD81D1751 121654~|~1~|~1~|~01/NHS~|~Construction of Roundabout at T intersection of US 250 with SR 21~|~21 - Safety~|~C1D4E79183F3FA86A50B55DD47D67690AD4BAE2C 119229~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~7F3F69AA29696FB2E3DAA2497AE8032634987FA9 120444~|~1~|~1~|~01/STR~|~Established Plan Split - 01/STR/PV/ 80% Federal (4PF7)/20% State (4PS7)~|~21 - Safety~|~CFE54DDC2E2E18F03FE8F36DAACA021CF0978931 94109~|~1~|~2~|~02/STR~|~Bridge Maintenance SFN 7807872 TRU SR 609 1.90 over Pymatuning Creek.~|~~|~9B6E93A275319C6E97E6A8D4E3B91FDEF0214708 94109~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 609 from 0.00 to 2.56.~|~~|~BDFE5C87A34BFEADE3F9B507991C615D96138EA1 108029~|~1~|~1~|~01/NHS~|~Signage~|~21 - Safety~|~6CE3FC4171306E358AC309C649A0D3BF1DC31DB3 108029~|~1~|~2~|~02/S5K~|~Speed Limit feedback signs in Milan.~|~21 - Safety~|~85D2573E2F458828125C7F48F1DFB7C40CD5318E 108029~|~3~|~3~|~03/S5K~|~Signage in Milan~|~21 - Safety~|~7175AA37ED38C53D045EE27A4D2BA8B755233451 101092~|~1~|~1~|~01/S>2~|~Concrete pavement repairs~|~05 - 4R Maintenance - Resurfacing~|~66402F24EA130DF65073B49F29686086AE1074A7 120546~|~1~|~1~|~01/SAF/HCEO~|~Plan split for CEAO HSIP funded portion of construction.~|~21 - Safety~|~AAEF527A49CED411900768BCC3E3E0F392630940 121797~|~1~|~1~|~01/SAF~|~Safety improvements. ~|~21 - Safety~|~64CF6851376D52F559B719707AFA41195DC887E4 93964~|~1~|~1~|~01/IMS~|~Conversion of th eIR-71 and Western Row interchange to a full interchange including constructon of new ramps and auxilary lanes.~|~04 - Reconstruction - No Added Capacity~|~E85E217B6AD1B908157DFAB3C1E5B382680CDFA5 93964~|~1~|~2~|~02/IMS~|~This plan split includes sealing of the deck, installation of polymer joints, installation of abutment supports, replacement of the NB parapets and interior SB parapet, and sealing of existing surfaces with epoxy urethane sealer for bridges WAR-71-0361 L&R (8301840/8301875).~|~13 - Bridge Rehabilitation~|~CC3015ABBE864E168275E36FE8AD34C72514A579 91851~|~3~|~3~|~03/STR~|~"03/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6401112 PER SR37 18.09 Intersect: Trib Of Black Fk Moxha Cr; Not BR Eligible for Replacement: Length=14 SD/FO(2) SR=44.1 DSR=5;~|~10 - Bridge Replacement~|~25F969B4454127AC635FA00301D05DEA2219570C 91851~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6400426 PER SR13 15.35 Intersect: Tributary Of Bear Creek; Not BR Eligible for Replacement: Length=16 SD/FO(1) SR=16.8 DSR=4;~|~10 - Bridge Replacement~|~4B607984D4EAB1C9EFD1771D1D62FA67C811676B 91851~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6400396 PER SR13 14.54 Intersect: Tributary Of Bear Creek; Not BR Eligible for Replacement: Length=16 SD/FO(1) SR=17.7 DSR=4; 2) 6400426 PER SR13 15.35 Intersect: Tributary Of Bear Creek; Not BR Eligible for Replacement: Length=16 SD/FO(1) SR=16.8 DSR=4; 3) 6401112 PER SR37 18.09 Intersect: Trib Of Black Fk Moxha Cr; Not BR Eligible for Replacement: Length=14 SD/FO(2) SR=44.1 DSR=5;~|~10 - Bridge Replacement~|~73AE42350CA890C2B5B065922006259A55499EBB 108396~|~1~|~1~|~01/NHS~|~BEL-7-11.00, DSR# BEL-022~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~577F595FE0350825C4FEC5F9F3C786D469618844 108396~|~1~|~2~|~02/NHS~|~BEL-7-14.00, DSR# BEL-025~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~238D843FA2DD3766173A490D61FAD9DA203F6B45 108396~|~1~|~3~|~03/NHS~|~BEL-7-24.30, DSR# BEL-019~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0E6FC83AD600D44B39A4B518603A33DA18331FF5 106689~|~1~|~1~|~01/NFA~|~Construction to excavate the unsuitable soils to a stable depth, fill with dump rock, establish proper drainage and restore the roadway.~|~01 - New Construction~|~276780630A1A4564FCEC4C2CD7A3AD4A415B6B2C 95553~|~1~|~1~|~01/ENH~|~MORPC/Columbus funding for sidewalks along COTA bus routes~|~28 - Facilities for Pedestrians & Bicycles~|~2801349D734B7FF13CA0F9092B6EA96AAF705462 111598~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes. 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder.~|~21 - Safety~|~FA8BC64D6A6E44DDDFB3709D69517D99A5E9A590 112931~|~1~|~1~|~01/S>2~|~DEL-3 from 1.38 to 8.74~|~05 - 4R Maintenance - Resurfacing~|~279456D89523FDC47E96638287A4EDFB5E45955C 109020~|~1~|~2~|~02/NFA~|~Project Construction cost is over the federal max. So Construction Engineering funding will be 100% Local~|~~|~861070FE7C389AC5E285840FC7CB101A864F9362 109020~|~1~|~1~|~01/NFP~|~80%/20% Tap fund with 15% of local share coming from TRC funds up to the new federal max of $1,262,295.~|~01 - New Construction~|~94B8EB083F9C12ACC4A45393539CB89415415CCB 99433~|~1~|~1~|~01/NFP~|~Crack seal of various routes throughout District 4.~|~44 - Other~|~1BC029163FC52E9BE8A5A9055349DAC329DD1EC1 114622~|~1~|~1~|~01/S<2~|~Overlay in PIK 220.~|~05 - 4R Maintenance - Resurfacing~|~6DD7ED16908B4D8AD7AA9CA6230B0F2CB6B2921D 114622~|~1~|~2~|~02/STR~|~Overlay on PIK 220~|~05 - 4R Maintenance - Resurfacing~|~8645935C185EBF502A10FAF217530F72B7FFBC68 114622~|~1~|~3~|~03/STR~|~Bridge PM ~|~47 - Bridge Preventive Maintenance~|~994D7B6BE35E683902C9EA5DECF514E72432A7AB 96871~|~1~|~1~|~01/NFA~|~Installation of traffic signal near Barberton elementary, in the City of Barberton, Summit County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~D15724BE83825E5FD2B15E9A887EB77CA3494C2C 88520~|~1~|~1~|~01/S>2~|~Milling of the existing roadway and resurfacing with asphalt concrete on MOT-SR-741 SLM 6.20 to 7.16 and 8.34 to 9.54~|~05 - 4R Maintenance - Resurfacing~|~69E3666C1D61F68DF8531399DFDE9DB76E6065E1 88520~|~1~|~2~|~02/BRO~|~SFN 5710510, MOT-741-0841 over Conrail RR, GM Access Road1. Remove exisiting latex modified concrete overlay using hydrodemolition and replace with SDC overlay. 2. Replace torn seals in expansion joints. 3. Reset 6 rockers out of adjustment on rear abutment. 4. Seal concrete surfaces.SFN 510472 Remove and replace wearing surface and waterproofing~|~13 - Bridge Rehabilitation~|~2B1811B020686E57AA82AC31D669D34E6D457A70 82463~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete on SLM 8.68 to 9.77 (segment length 1.09 Total Lane Miles 2.18). Urban Paving Program.~|~~|~23B7F4CEBF7E182C1223251533DA020394F908DC 82463~|~1~|~2~|~02/S<2~|~Pavement planing and resurfacing with asphalt concrete on LOG US 68 SLM 9.77 to 10.09 (segment Length 0.320 Total Lane Miles 0.640).~|~~|~BB7192C01D4E908C070CE790758C51CD79A78340 107639~|~1~|~1~|~01/NFA~|~Replace ADA 770 10.27 (0104558)~|~10 - Bridge Replacement~|~CF8A66F5C539CEA1467467DF9043E3B41580F94D 98543~|~1~|~1~|~01/SAF~|~District Wide contract to replace roadside delineators in FY2020~|~21 - Safety~|~D8DBFF3F9BC3EA5C02F347AB2ADFE71F9F2DB015 112988~|~1~|~1~|~01/IMS~|~Rehabilitate the HAM-71--5512 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other minor repairs.~|~13 - Bridge Rehabilitation~|~85F2C149CCE339993D9C5C558D61488D72C26F16 104740~|~1~|~1~|~01/SAF~|~Installing two traffic signals along East Market St (SR 82 off-Ramp & Warren Sharron Rd), allowing left-turns off of the SR 82 EB off-ramp to East Market St, reconfiguring EB East Market St to consist of a left-turn-only lane and a signal by-pass lane, and realigning WB Warren Sharon Rd. CR 329 from 3.27 to 3.43.~|~21 - Safety~|~95589A9C7FFE8D4068B35F77621F61E3697DFB9F 79353~|~1~|~1~|~01/BRO~|~New bridge Construction on future SR 702, across Ohio River~|~08 - Bridge - New Construction~|~D32184272A91204F739B92AB7C3929F3AAC39F1E 79353~|~1~|~2~|~02/BRO~|~For reimbursement to WVDOT for Construction Engineering Services provided by them for Construction of new bridge across River Ohio on future SR 702~|~17 - Construction Engineering~|~FC901831FCEC629DD0E5D5A788EED1305DF77A79 93889~|~1~|~1~|~01/SAF~|~Replacement of signal on State Route 305 at North Park Avenue in Champion Township, Trumbull County, Ohio.~|~~|~C6131D646340B36D649FCCB8F10FAFD75427A04A 91964~|~1~|~3~|~03/STR~|~Resurfacing on SR 45 from SLM 18.99 to 19.63~|~05 - 4R Maintenance - Resurfacing~|~592F02834633EE99AAD8BCDC3ED9D5C981619EFD 91964~|~1~|~2~|~02/S<2~|~Resurfacing on SR 45 from SLM 16.92 to 18.99.~|~05 - 4R Maintenance - Resurfacing~|~6113DC52DA30AD37E4873815AFDAF3A3BB449487 91964~|~1~|~1~|~01/NHS~|~Resrufacing on SR 45 from SLM 29.34 to 29.61, SR 14 and US 62 in the NHS area.~|~05 - 4R Maintenance - Resurfacing~|~D498D0C1F2948843E44958E506F7BCEBFE72CC25 103835~|~1~|~1~|~01/S<2~|~Improvement of downtown streets with crosswalks, signals, signage.~|~28 - Facilities for Pedestrians & Bicycles~|~2407CF1958C6E987F2D06F86E82456021D91FEAB 114936~|~1~|~1~|~01/STR~|~Bridge Replacement.~|~17 - Construction Engineering~|~61BA06CDC06FA1D09BAB8A480770C77694DDB751 83024~|~2~|~2~|~02/BRF~|~"02/BRF/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6006574 MUS SR666 5.71 Intersect: Over Blount Run; BR Eligible for Replacement; Length=31 SD/FO(1) SR=49.7 DSR=3~|~10 - Bridge Replacement~|~7E556B58C03765CD1A0390B8A33A02AB26769532 83024~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 6006450 MUS SR666 2.66 Intersect: Sr666 Over Ditch; Not BR Eligible for replacement: Length=21 SD/FO(1) SR 52.8 DSR=5~|~10 - Bridge Replacement~|~D4EE972F6F65CBC1FEC64DD54029EFA5C03ED950 112429~|~1~|~1~|~01/S<2~|~01/S<2/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~0BBC3ECDAA408A3D8E0AE5B7753FC96E12DDFCEC 112429~|~1~|~2~|~02/STR~|~02/STR/PV/ - Plan SPlit 2~|~05 - 4R Maintenance - Resurfacing~|~38BE2820B6BA1F2FD099B458613F4FD989FB88ED 83958~|~1~|~1~|~01/BRO~|~SFN 6503330; PIC SR 674-4.210 - BRIDGE OVER TURKEY RUN~|~10 - Bridge Replacement~|~BB155C57ABD835AD21FA16B865E126E8E7F8EB55 75322~|~1~|~1~|~01/NFA~|~New bridge over RR in Fostoria~|~08 - Bridge - New Construction~|~5CBC5631D1D4FF894BF84DFF16AC681CF9553A30 113674~|~1~|~1~|~01/NHS~|~Split for bridge work on SR-8 and SR-10~|~47 - Bridge Preventive Maintenance~|~FF5A05CA5D2BEC6712455DDBCF10EA3CE1A679BF 113674~|~1~|~2~|~02/NFA~|~Plan split to purchase excess materials from contractor~|~44 - Other~|~E2E3CECCACB8690BA3090035AAAFDFEC20C9BF06 116184~|~1~|~1~|~01/STR~|~Bridge replacement.~|~04 - Reconstruction - No Added Capacity~|~1C0D8816CA6282196830CA2300E7BAB1FA1D3728 109685~|~1~|~1~|~01/STR~|~Resurfacing HOL-241~|~05 - 4R Maintenance - Resurfacing~|~AD7275BEA1B8E11347FE68908B145C4C29540D4D 115007~|~1~|~1~|~01/MPO/BEAV~|~Reconstruction of North Fairfield Road from Crossing Blvd. to I-675 ramps. Reconstruction of I-675 EB off ramp with widening to increase storage capacity.~|~04 - Reconstruction - No Added Capacity~|~2711A1848D9560DF0F484675AE3512F89EE74B9E 92626~|~1~|~1~|~01/NHS~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~432FB2A6ECB6D19FFC740BD8B0BF05DC264C34F5 122811~|~1~|~1~|~01/MPO~|~Anderson Township EV Charging~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~5E5D3E2906D1159539DE42E305505088A62A85C4 117767~|~1~|~1~|~01/SAF~|~Roadside/Median Improvement (Safety)~|~21 - Safety~|~8E20387BDA04E3BCCF985AD41DD4A891558BAA08 122027~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~D3AD938FC28F54D130868F4C860FB1C141D1E506 120449~|~1~|~1~|~01/SAF~|~Roundabout at the Interstate 670 off-ramp at Johnstown Road and East 17th Avenue~|~21 - Safety~|~B48C6DCE9899206722717BA13B66A7EA2E6BB25A 88229~|~1~|~1~|~01/CMQ~|~Convert operation of the signals from pretimed to actuated, coordinate signal operations, and install preemption system at the intersections of College/Covington, College/Water, and College/High streets.~|~21 - Safety~|~F5DCF8C9D41D5F3D21A1A15DE0F4838EF477DC9E 107927~|~1~|~2~|~02/STR~|~Rehab or replace culverts on rural route: CLE-756~|~04 - Reconstruction - No Added Capacity~|~671A88BE3E37912912FA53CECF5DE6331788A688 107927~|~1~|~1~|~01/NHS~|~Replace or rehab NHS culverts: CLE-52~|~04 - Reconstruction - No Added Capacity~|~EE1551241FE970AD5AEB2E28FEF5C5489EF14809 107927~|~1~|~3~|~03/NFA~|~rehab culverts along SR743~|~04 - Reconstruction - No Added Capacity~|~70A551BCB162466BFEADC97F04E10217804FDD5F 126297~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~E7C2C029872B669AA6EE290B28E0070108E25DEC 123200~|~1~|~1~|~01/IMS~|~Heat straighten and repair bridge due to unknown bridge strike in 2024~|~13 - Bridge Rehabilitation~|~D7F2B309D0D329A7A53924F9EA6364E07066D402 123200~|~1~|~2~|~02/NHS~|~CLA-68-6.64 - Heat straighten and repair bridge due to unknown bridge strike in 2023.~|~13 - Bridge Rehabilitation~|~2D54BCAF8911E7BB33CF269DC0C58D6A89CC44B5 123200~|~1~|~3~|~03/NHS~|~CLA-68-7.41-R. Heat straighten and repair bridge due to a bridge strike on 6/14/2023. Completed accident report number is 12-0544-12.~|~13 - Bridge Rehabilitation~|~DF7F48DF9F65F9E7712ECA61678F746C76CEE361 123200~|~1~|~4~|~04/NHS~|~MOT-35-13.44. Repair bridge due to a bridge strike on 2/21/2024. Completed accident report number is 2402210018.~|~13 - Bridge Rehabilitation~|~3AF9C5FEFD5ADD8642B059DE1E1266C81BD7749A 83280~|~1~|~1~|~01/CMQ~|~LAW CR144 2.94 Charley Creek It is proposed to realign the intersection of CR144 & CR1 and also build an access road south of US52 to access development. 80% KYOVA/20 Local Match01/CMAQ/PV/Law~|~01 - New Construction~|~4B720F75152F0665F0BC41FC96D6E4EFD9858485 83280~|~1~|~2~|~02/MPO~|~LAW CR144 2.94 Charley Creek It is proposed to realign the intersection of CR144 & CR1 and also build an access road south of US52 to access development. STP Funds 80% KYOVA/20 Local Match01/MPO/PV/LAW~|~01 - New Construction~|~F4862F7977FE03AA876DD20CE5819EE895A9CE22 123159~|~1~|~1~|~01/IMS~|~Resurfacing with fine graded polymer modified asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~78EBBBAF1F534766E9BCB4422E57D0F69A49EB8D 119381~|~1~|~1~|~01/IMS~|~Lining culverts.~|~04 - Reconstruction - No Added Capacity~|~A35420D26A5919949C47C3191DA0E48F770FB86C 119381~|~1~|~2~|~02/NHS~|~Lining culvert.~|~04 - Reconstruction - No Added Capacity~|~DC2E4FC30D8687D40203C30698867A282961899A 119381~|~1~|~4~|~04/STR~|~Culvert other and culvert lining.~|~04 - Reconstruction - No Added Capacity~|~D718F0DE6864A84B793077DF88E77B3C6761C873 119381~|~1~|~3~|~03/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~04F665BCC927B2C9C7F9925D6ACBAFBA91A0B4E2 114680~|~1~|~1~|~01/S5K~|~Reconstruct slope due to erosion along ATB SR 531.~|~04 - Reconstruction - No Added Capacity~|~3A5F5039CBAEF14CF99AC3BF8B48429BE6C7BACB 115512~|~1~|~1~|~01/SAF~|~Safety funded items up to program max~|~21 - Safety~|~0B91CED9FC2427A52E8EB0B5A8E92DF5885B7898 92874~|~1~|~2~|~02/S>2~|~100% local participation~|~17 - Construction Engineering~|~A7AFE02B1579B2D45FDB428860C9EFF396B60231 92874~|~1~|~1~|~01/S>2~|~80/20 federal/state participation to repair slide.~|~44 - Other~|~C3539B281F64BFBD9B449B06858AE76B80CA7F7F 117271~|~1~|~1~|~01/MPO~|~Sidewalk work~|~44 - Other~|~7C24DFFE8029190F2F6BAA50BF2CFFE61EE16DA6 100844~|~1~|~1~|~01/S<2~|~Slide repairs~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C2967C2590BEAA66242B5B8D2B623DFF7B8C1AA6 125861~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~54C3BBDEAC2BEB01DFFDFBBFE962C6475A1EB258 125861~|~1~|~2~|~02/NHS/CAMP~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~AF4659649B23D95F649CE98DE02A86EEE8BF0BA8 125861~|~1~|~3~|~03/NHS/CAMP~|~Full and partial depth pavement repairs.~|~04 - Reconstruction - No Added Capacity~|~5228D82B20187B1AE325B5FAC0E8AFB17F214E37 125861~|~1~|~4~|~04/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~01506DAB7394E9D43AC04B095B06E8231BFE3E49 125861~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~D95BFFF1F902D437CE841725407CACEBC8812DC7 110753~|~1~|~1~|~01/BRF~|~Bridge replacement 80% federal 4B87 and 20% local LNTP.~|~10 - Bridge Replacement~|~76CEF1D62DACDB2546F4F0C66B489700A36711DF 101065~|~1~|~1~|~01/SAF~|~Install rumble stripes along the edge lines of the center two-way left turning lane on PIK 23 13.26.~|~21 - Safety~|~F529C34B9D5A5A3833F0DC8A1E9375DD47F473CE 101204~|~1~|~1~|~01/NHS~|~CO CO Contr 01 pavement plan split 1 for the following NHS routes: DEL-36-23.30-29.08 DEL-37-0.00-7.26 UNI-33-12.59-24.55~|~05 - 4R Maintenance - Resurfacing~|~62C27981EF71CAA382289755CE1817F5BD0F5B4A 101204~|~2~|~2~|~02/STR~|~CO CO Contr 02 plan split 2 created for the following STP rural routes: MRW-229-5.30-12.42 UNI-42-0.00-4.84~|~05 - 4R Maintenance - Resurfacing~|~42E81BFE2F8CE6AA41F07F6ADE0E30431635AAAE 101204~|~1~|~3~|~03/NHS~|~CO CO Engr 01 plan split 1 created for the following NHS routes: DEL-37-23.30-29.08 DEL-36-0.00-7.26 UNI-33-12.59-24.55~|~17 - Construction Engineering~|~D51241615E717C6BED09BBC6C3A411333AD79C32 101204~|~2~|~4~|~04/STR~|~CO CO Engr 02 plan split 2 for the following STP rural routes: MRW-229-5.30-12.42 UNI-42-0.00-4.84~|~17 - Construction Engineering~|~94309840D2B25F36E1997A9B53A15C2D10A95B13 127183~|~1~|~1~|~01/S5K~|~Small City plan split~|~04 - Reconstruction - No Added Capacity~|~FE47ABFE2ADA5E515C708B9861CC04C0ACC4169F 111101~|~1~|~1~|~01/NHS~|~Plans split 1 for Bridge SFN 3500365~|~13 - Bridge Rehabilitation~|~B28DFF60A5335A51E756A6B5E4FA7738F5C9A773 109486~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~6D972B4F7791ED9CC76EE160FE030D56E1651B44 97229~|~1~|~1~|~01/STR~|~BRO SR 505 6.83~|~03 - Reconstruction - Added Capacity~|~56B5DCD79CF0B2271AC90900D9CEF9BE26E7B904 109576~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~9A2ABCA443FE335368A33CE3E5F0EFB7D79DEAA3 114546~|~1~|~1~|~01/NFP~|~Crack Sealing funding~|~99 - State Preventative Maintenance~|~1AAB840C4DB74C82114AC84ABC871AEB49EC085C 126369~|~1~|~1~|~01/BRO/CANT~|~Bridge replacement.~|~10 - Bridge Replacement~|~1678ADF716EE03F8508E314A7A155C5204C95CF0 83340~|~1~|~1~|~01/BRF~|~CEAO Bridge replacementCR84-0.260/Bates Rd over Little Darby Creek, SFN 8032203Local Sponsor - UNI County Engineer~|~10 - Bridge Replacement~|~A244291D6ACBCD857E67833E1FA8CC5AC3794895 119635~|~1~|~1~|~01/NFP~|~Laboratory testing in District Six.~|~17 - Construction Engineering~|~312CD52C9B43855CAAFACC71E8E89DAD306C27A6 105346~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 5: Remove Duke Energy's 15kv distribution lines from under the north utility trough and relocate to the south side of the viaduct if they cannot be removed entirely. Relocate the 36 inch water main and Level 3 fiber optic cables out of the north trough. Remove the north utility trough.~|~17 - Construction Engineering~|~CA03D760D73D4A63B51D4B4CFE2CCEF572FF23BB 120672~|~1~|~1~|~01/MPO~|~Funding split for Carbon Reduction Program funding~|~28 - Facilities for Pedestrians & Bicycles~|~FBAB9E05CC666D8EAD55AE7C9A8CCFD1140444B3 124128~|~1~|~2~|~02/IMS~|~Widen from 4 to 6 lanes~|~03 - Reconstruction - Added Capacity~|~45FC6FD674712AB54C00B1B49B689C097CAEFDC0 124128~|~1~|~1~|~01/IMS~|~Major rehabilitation of existing travel lanes~|~04 - Reconstruction - No Added Capacity~|~7A03A3D5FE34CE89711DE5CDAAEEA425CF3AE6FA 110259~|~1~|~1~|~01/NHS~|~Lytle Tunnel Repair work.~|~52 - Tunnel Rehabilitation~|~4726FAE246D1076143E86EE021DDE510FA88EC51 95634~|~1~|~1~|~01/NFA/SCI~|~It is proposed to replace/rebuild guardrail at various locations on the local county roads in Scioto County.100% safety funds provided by CEAO.~|~21 - Safety~|~EE205DF75639A095D9B795B04D4FFC1A87036679 109562~|~1~|~1~|~01/SAF~|~This project is the district's long line maintenance contract to maintain the centerline, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district.~|~21 - Safety~|~39A7745CD38D144A4146E8D2E5CA565A833074D4 107722~|~1~|~1~|~01/STR~|~Slide RepairADA 41 22.50~|~04 - Reconstruction - No Added Capacity~|~1239A173ACC885EDD0B6D145982093BB4E069BCA 117384~|~1~|~1~|~01/MPO/CORT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~BB585055DA4936E57DDB4706982761C3526A7373 87900~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP's - Guardrail Upgrade - Lic-SR 37-25.15-25.20~|~21 - Safety~|~8AE69A8084B828848DD9E27485E8AB654502B1E5 87900~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail upgrade: 1) Lic-SR 13-17.51 to 23.34; 2) Kno-SR 13-00.00 to 23.09; 3) Lic-SR 16-14.41 to 30.84; 4) Lic-SR 79-05.55 to 13.74~|~21 - Safety~|~E6B750EAB0CFA08A12266D5AF09EE6CF77DA25B1 87900~|~1~|~2~|~02/SAE~|~"02/SAE/PV/ " - Safety 100% 4HJ7 - Capped at $400,000.00 Contract, $40,000.00 CENG - Guardrail end treatments replacement: 1) Lic-SR 13-17.51 to 23.34; 2) Kno-SR 13-00.00 to 23.09; 3) Lic-SR 16-14.41 to 30.84; 4) Lic-SR 79-05.55 to 13.74~|~21 - Safety~|~F31CC78CA07A4D2B1F32CD19F9C0C34C09CADB82 95686~|~1~|~1~|~01/S>2~|~Bancroft St from Secor to Parkside~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~67DC2D5BF23BFCE8D2B377001FF23261344A1B86 114120~|~1~|~1~|~01/STR~|~milling and resurfacing on Bellville-Johnsville (CR31)~|~05 - 4R Maintenance - Resurfacing~|~96B9D82FC369E57FAC6334663B31E6CBDECD4524 114120~|~1~|~2~|~02/S<2~|~Milling & Paving Lexington-Ontario Rd (CR144) STP 5000 to 200,000~|~05 - 4R Maintenance - Resurfacing~|~68F51D61CFF7DFF9C4CE361A8C89D2CD4D519E84 114120~|~1~|~3~|~03/STR~|~Milling & Paving Lexington-Ontario Rd (CR144) STP Rural (<5000)~|~05 - 4R Maintenance - Resurfacing~|~5472C9C4462659C2671C7A49B5DEB98B465F0738 108931~|~1~|~1~|~01/BRF~|~SFN 8533903~|~10 - Bridge Replacement~|~C1318D22318BE3516E428D50A64798B341A5B280 118760~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~FE9724D16A83AD770BD42BFF8F3C2EBAD5710978 105717~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~818964B777860F4F290871A258C0C8B49F09BAE5 105717~|~1~|~2~|~02/NFP~|~Plan split for 100% local items~|~17 - Construction Engineering~|~B2FD0D63B7578D7AA9996903403A34709C95612A 109644~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SLM 29.30 to 33.58~|~05 - 4R Maintenance - Resurfacing~|~557D62B324C90DA2A36DCD0AF1D738A3800744AF 109644~|~1~|~2~|~02/S<2~|~Resurfacing SR 147 from SLM 33.58 to 34.90~|~05 - 4R Maintenance - Resurfacing~|~1C7BEECF2BFCB66337C1856A2D566FB8A082E1B9 101718~|~1~|~2~|~02/NHS/JOHN~|~Plan Split for resurfacing inside City of Johnstown, 80% 4PF7/20% 4BG7 ~|~05 - 4R Maintenance - Resurfacing~|~78B22908E6AD2C5B016422C70B6EBD9CE76766BC 101718~|~1~|~1~|~01/SAF/JOHN~|~Intersection improvements at SR 37 and Leafy Dell Road in city of Johnstown.~|~21 - Safety~|~4A832DBD6FC6215290996557BB70463A7B2554D1 101718~|~1~|~3~|~03/NHS/JOHN~|~Plan Split for curb ramp work 100% City of Johnstown.~|~05 - 4R Maintenance - Resurfacing~|~5F2869A51FF5DF4FA902BB68A990CE388EF5006D 115687~|~1~|~1~|~01/NFP~|~Created for J&C involvement. ~|~44 - Other~|~35087B6DDC4C2FC00A4C4019B35BA39C80980C69 106407~|~1~|~1~|~01/SAF~|~Install multi-lane roundabout at Wayne Madison and Hamilton Trenton Rd with pedestrian accommodations~|~21 - Safety~|~E8C519CF2E5199515F36732E06352AD917D2994F 116046~|~1~|~1~|~01/NHS~|~Plan split for the slide repairs on HAM-52~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~44DCD8F11DDE51E8BEBBC3D38F330D28F8FEA50F 25874~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on GUE SR265 0-4.59~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0EB5230EB235EE13B4430ABDE55C27AE60ED3861 25874~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation Pavement Marking - 4MP7 (100% State) - No CAP - Pavement Marking on Gue-IR 70-17.50-22.80~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~489F497485CA3092F9305C8950C9EA41931CE7C6 25874~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing of the interstate GUE IR70 17.55-22.80~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~71DD4A9F5C0E3F1BBF0D52BAC55BCC9A6517EAA8 25874~|~1~|~4~|~04/STR~|~"04/STR/PV/ " - District Preservation Pavement Marking - 4MP7 (100% State) - No CAP - Pavement Marking on Gue-SR 265-00.00-04.59~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~98F307989DFCBE96BCE073E1FA9D5386FEC24C45 96731~|~1~|~1~|~01/STR~|~STP Rural Smoothseal: ASD-60-30.32-32.83 / CRA-598-11.00-15.36 / CRA-602-0.00-4.25 / ERI-61-4.77-7.21 / HUR-61-3.06-6.70 / HUR-61-12.08-14.86~|~05 - 4R Maintenance - Resurfacing~|~01E15A9FBCC9F819065A71CC59783C5269644D4B 96731~|~1~|~3~|~03/NFA~|~Non-Federal Aid Smoothseal: CRA-39-0.00-4.02~|~05 - 4R Maintenance - Resurfacing~|~E7AF8D807D3101C6CAADA7799729EE2E7FDB958E 96731~|~1~|~2~|~02/S<2~|~STP < 200000 Smoothseal: ERI-61-7.21-7.99 / HUR-61-2.91-3.06 / HUR-61-14.86-16.96~|~05 - 4R Maintenance - Resurfacing~|~D4622449657944EADE4080A6C85227C75E5DBC5E 120384~|~1~|~1~|~01/NHS~|~Plan split for land slide repair~|~66 - Resilience Improvement - Highway Project ~|~9927B4431C11A01B2CF079C8CE3D332EF3CAE2C3 122808~|~1~|~1~|~01/MPO~|~City of Springdale installation of EV charging stations~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~6EF76950858F8C72DFDED729C754628EF9C01C05 116865~|~1~|~1~|~01/S>2~|~Install a new traffic signal at the IR 71 southbound ramps and SR 48 intersection. Extend the northbound SR 48 left turn lane to IR 71 southbound. Widen SR 48 northbound to extend the 3 lane section through the IR 71 southbound ramps and SR 48 intersection.~|~03 - Reconstruction - Added Capacity~|~7D83920577D419668ED0E9DD8924120A82516D8B 116865~|~1~|~2~|~02/IMS~|~Resurface the I-71 NB exit ramp and the I-71 SB entrance ramp to correct pavement friction deficiency. ~|~21 - Safety~|~093D7B4F0887A016AE19F85627F2824A6D97EB24 121252~|~1~|~1~|~01/SAF~|~Plan split for systematic signal upgrades and installations ~|~21 - Safety~|~85CEB8CF34292EFF8A72459A1C8F0AAD328132A2 94527~|~1~|~2~|~02/MPO/DEL~|~100% City of Delaware funding for water line~|~04 - Reconstruction - No Added Capacity~|~858477B4DF6D60CEF0A7FD9C9AA94338AD3C5E10 94527~|~1~|~1~|~01/MPO~|~MORPC/Delaware funding to upgrade 23/Pennsylvania interchange~|~04 - Reconstruction - No Added Capacity~|~CDEAA062D4FD01796AF4B21D34DD22879394A2ED 83793~|~1~|~2~|~02/SAF~|~adjusting manhole/water valve castings, waterline work - 100% Lorain County~|~21 - Safety~|~2B0EF0B40D05DD0FD625815A9EFDB2B752084DEE 83793~|~1~|~1~|~01/S<2~|~Roadway widening - Installing a right turn lane & 2 way left turn lane - Safety Funds~|~21 - Safety~|~AB13F14A167D38F2AF308B625A60F78CBF4AE383 83793~|~1~|~3~|~03/S<2~|~Plan Split 3 for Local Detour Route Repairs using 100% State District Allocation Funds.~|~21 - Safety~|~737EB0998F0B32D28D37932185285BBF618BDC01 99918~|~1~|~1~|~01/BRF~|~CEAO funded bridge rehab on Centerburg Rd over Culver Creek~|~13 - Bridge Rehabilitation~|~7CCD18545C70EC65A08B58FB94178C98FACA6D95 97875~|~1~|~1~|~01/NHS~|~Upgrade Light and Acceleration lane~|~21 - Safety~|~AC3186ABE4C7BF23287FE414C56D78B2893EEF5D 96258~|~1~|~2~|~02/NFA~|~Bridge replacement. City of Jackson Huron St. Bridge (SFN 4060393). Under OBPP~|~10 - Bridge Replacement~|~ECD2951407E8E6F155ED05465585AEAA70DC86D3 96258~|~1~|~1~|~01/NFA/JAC~|~Bridge replacement. City of Jackson Dickason St. (SFN 4060490)~|~10 - Bridge Replacement~|~B2A816F31DE9FDCF0DA27C522D0A8B92E2F9C594 120393~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~3CF4A65A4EADEE507EDF80DDE87D071831D474CD 111492~|~1~|~1~|~01/SAF~|~Realign westbound SR-32 to re-establish three westbound through lanes from Glen Este Withamsville to I-275. Evaluate potential to realign ramps from westbound SR-32 to southbound I-275 to improve vertical clearance.~|~21 - Safety~|~788964224E52BEA1DB449972777096927D6C5E6A 111492~|~1~|~2~|~02/BRO~|~This work includes all work associated with SFN 1305735~|~13 - Bridge Rehabilitation~|~A736F96099ED0B61B61D7B13456079BE8E9BCCE8 99950~|~1~|~1~|~01/SAF~|~Replace/extend approximately 6,000 ft of guardrail on various county routes throughout Stark County.~|~21 - Safety~|~4AEF67D3856D1D435DA418431B698125E335BDEF 100762~|~1~|~1~|~01/NHS~|~Concrete Pavement Repair. HOC US 33 14.69 WB - 16.06 WB. NHS, Federal/State 80/20% funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~22E5867F1D3093ED9C591EF52FF26983C37E17A5 126931~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~21 - Safety~|~9BA98F23A2111E9E09D0ED7775813829E6FD6DA0 95007~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~01 - New Construction~|~6E57AB5A456AC9791171AB678896ACDE1280A2FE 115411~|~1~|~1~|~01/S>2~|~Pedestrian/Bike Facilities on East Cooke Rd between Karl Rd and Cleveland Ave~|~28 - Facilities for Pedestrians & Bicycles~|~1F3D0804BD074F8AED722F6A9CB96A0E2A0D32BB 105726~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~F9325D111176CBDADF4006FF52E348262B889A1C 105726~|~1~|~3~|~03/NFP~|~work requested by the LPA that is not eligible for federal-aid~|~~|~F696C9A85185306407AFDCF668B85A2DECDBC0E8 105726~|~1~|~2~|~02/MPO~|~TLCI Implementation eligible work for the City of Parma Heights~|~28 - Facilities for Pedestrians & Bicycles~|~2ACB2AD2FCD2793BBF3494B91E7C361F60E1DBD1 100498~|~1~|~1~|~01/NFA~|~ADA 137 (0.00-3.56)~|~05 - 4R Maintenance - Resurfacing~|~A4486B28971664C916B49F77C95F56EE1DFEB7D3 123148~|~1~|~1~|~01/NHS~|~Plan split for rehabilitation of concrete pavement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~776827E23D2D3A5941A96AAB700E007A1A638611 90461~|~1~|~1~|~01/STR~|~Concrete deck replacement. ATH 13 0812 (SFN 0500194). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~561C77915CF0FC309354AD4EEC90B7D3E663F6D3 96710~|~1~|~1~|~01/ENH/LIMA~|~Work funded by the ODOT Central Office managed Transportation Alternatives Program. Funding is 80% federal and 20% local funds. The City of Lima will provide the 20% local funds.~|~28 - Facilities for Pedestrians & Bicycles~|~900C301AB1FC9B864C0A963BAC61E4BA1C670B3B 107541~|~1~|~1~|~01/STR~|~Resurfacing HOL-62 and HOL-60~|~05 - 4R Maintenance - Resurfacing~|~5AF3FEB7D8D537429118F9AFB8B9E0E3194DEAAB 105359~|~1~|~2~|~02/IMS~|~Lamp replacements at 56 locations. Battery Backup replacements at 5 locations.~|~44 - Other~|~232C495E9A7E0ADAF341C680A51E46105BA1E5D9 105359~|~1~|~1~|~01/NHS~|~MED SR 0018 Sign Installations at 15.11 & 15.42Updated SR 602 and CR 0330 signage and removal of overhead flasher~|~44 - Other~|~3A658FF02AB397F45A185709D4FCD676989ABCDF 78609~|~1~|~1~|~01/BRF~|~Bridge ReplacementProject Termini: On CR42A, bridge is 0.28 mile from the Clermont County Line. Project Description: In Brown County, it is proposed to replace a bridge (SFN 0833436) (0.28) on CR42A over Bullskin Creek. Bridge is BR funding eligible with CEAO Federal Funds providing 95% and the local providing 5%. BR Eligible. 80/20 split local match Brown Co., 01/BRO/BR/BRO~|~10 - Bridge Replacement~|~B9A335DAC793E94451185A97EDD5536641107628 94431~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~10 - Bridge Replacement~|~EDC65E3CB9C59B194E9DFC6F730ADD73EA740F40 107557~|~1~|~1~|~01/SAF~|~Systematic replacement of signs at various locations in Fayette and Pickaway counties.~|~21 - Safety~|~47B149383F650E02667470D35B3B7507DAB324FC 100385~|~1~|~1~|~01/S<2~|~New roadway/connector~|~17 - Construction Engineering~|~0EE0E8CE32C6C9A45DA6D5269650CD40248AB035 113731~|~1~|~1~|~01/NFP~|~"01/NFA/PV/ - 100% State Funded (4BF7) - resurfacing route(s) within Salt Fork State Park.~|~05 - 4R Maintenance - Resurfacing~|~21F1B309AD251F8D10196AB20CD7A2B0FA1474A8 113804~|~1~|~2~|~02/SAE~|~Safety funds - 4HJ7 - for Thermoplastic~|~21 - Safety~|~95736B52757F22318149E2E1FDF6E619019A0DDC 113804~|~1~|~1~|~01/SAE~|~Pavement Marking - 4HB7 - Paint~|~21 - Safety~|~819B4DDA52F93B3985D3F1CF6D5587CF12BA1DA5 113804~|~1~|~3~|~03/SAE~|~CE for 4HJ7 Safety funds~|~~|~2D65014F9490891266F6B95BA572C6599BA80ADC 112607~|~1~|~1~|~01/ENH~|~Installation of new sidewalks along TRU SR 5 from the town square to Lakeview Dr NE in Kinsman Township.~|~28 - Facilities for Pedestrians & Bicycles~|~FC2CB09A83EAAC9625D914B51BDC7416C34EF279 110617~|~1~|~1~|~01/STR~|~All items of work associated with the resurfacing of SR-37 in Union County.~|~05 - 4R Maintenance - Resurfacing~|~04BAB978F92D9013D5401E357650DFE2DA6D7697 109311~|~1~|~1~|~01/SAF~|~Pavement marking on various county roads 100% 4HB7 CEAO Safety funds.~|~21 - Safety~|~9512F3356D8C21E3A5582144329879C285B50CAF 109066~|~1~|~1~|~01/S<2~|~Bridge replacement project. WAS CR 20 6.58, SFN 8430519.~|~10 - Bridge Replacement~|~F526C170984AA2A1252E7290370ED09DA8531E8D 98624~|~1~|~1~|~01/MPO~|~80/20 federal funds with local match for all eligible work.~|~05 - 4R Maintenance - Resurfacing~|~B3D97D8B988B4D0D7C3524E31BE362928F915687 100981~|~1~|~1~|~01/NHS~|~DSR# JEF-001~|~04 - Reconstruction - No Added Capacity~|~FC2B40B646657721B5384680B85CF08EA1C85D6C 114893~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~87D3AB98EB052A5CFE8D76BE1779DF0F64D99161 114893~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~C5D539AD88265C91FF354CF0098D6D2075EB3EF5 114893~|~2~|~3~|~03/SAF~|~R-Cut installation at the SR 82 and Niles Vienna Road intersection.~|~21 - Safety~|~96B412F7D1EEA9449C6CB5B941BD383496940A5A 85529~|~1~|~1~|~01/IMS~|~Funding split for pavement work on the interstate~|~05 - 4R Maintenance - Resurfacing~|~77C4CF519BF162654BECCE514BF276AA3D06C0A2 121625~|~1~|~1~|~01/NHS~|~Repair of the CLE-32-0684 bridge due to over height vehicle impact.~|~13 - Bridge Rehabilitation~|~3A7DEF904E24233015AFC133EC79C67FEE1F4F13 117912~|~1~|~1~|~01/NFA~|~NEVI Phase1 I-71-E, MED, CUY 226-245~|~~|~7BD647D10BE1CEA984748440FA0E95DAA3FDDB12 117912~|~1~|~2~|~02/NFA~|~NEVI Phase I-74-A, HAM 1-18~|~~|~E98CA7CBE283C0AF7EA59CC2E1704489D383DBDE 100632~|~1~|~1~|~01/IMS~|~Double application microsurfacing on BUT IR 75 SLM 5.51 to 7.14~|~05 - 4R Maintenance - Resurfacing~|~1CC4E64C38D5F9C3D7090DDC9ABF4297DF06E61E 112175~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span.~|~~|~37DB186D9D047E561208A18746CFE5C967474FB2 112876~|~1~|~1~|~01/STR~|~MAR-739 & MAR-47 general resurfacing plan split.~|~05 - 4R Maintenance - Resurfacing~|~B2A25B5A2FAC0B5D9EC6E005840D211116102647 112876~|~1~|~2~|~02/STR~|~Pavement repairs in the Village of Waldo.~|~05 - 4R Maintenance - Resurfacing~|~A4B7E4720F83E1200965FF5544955C4AFBF2A35A 100619~|~1~|~1~|~01/NHS~|~Sealing of bridge decks at various locations throughout the state~|~47 - Bridge Preventive Maintenance~|~66875FC932C34D1F3DBF354B258418EE7A21C778 127010~|~1~|~1~|~01/STR~|~Intersection improvement at SR 37 and James Road (TR 132) in Licking County.~|~21 - Safety~|~F3A72BCA63663539E5CED06ADC0ECDCE1D034841 88933~|~1~|~2~|~02/NHS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~BEAC739DB41B4F56E0355AEFECE85A222556C628 88933~|~1~|~4~|~04/S<2~|~Replacing linked culvert.~|~04 - Reconstruction - No Added Capacity~|~3F48ECFFD40AFC19A04F37CF290DFDB7A5CC687B 88933~|~1~|~1~|~01/NHS~|~Resurfacing of ATB SR 11 from 13.94 to 21.16~|~05 - 4R Maintenance - Resurfacing~|~908365BBDC26A58CC0F429D02A0061112730BCB8 88933~|~1~|~3~|~03/S<2~|~Resurfacing ATB SR 45 from 24.07 to 24.11.~|~05 - 4R Maintenance - Resurfacing~|~3DB108B08FC7EC942884FD402F087751C034E073 107996~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~48720E6B16D24BF0D2AA971B65329FCF4CD077CE 96651~|~1~|~1~|~01/STR~|~Plan Split for resurface and pavement repair on CLI-22 between SLM 12.57 - 17.71. Project will omit area over the cuvlert SLM 13.89. This location will be covered by future pid 85139.~|~05 - 4R Maintenance - Resurfacing~|~E4CF373E9419DDCACA5A14912DF3B72DF4083A1D 105055~|~1~|~1~|~01/ENH~|~Construction of sidewalk and multi-use trail, and relocation of a section of multi-use trail within Pierce Township Park.~|~28 - Facilities for Pedestrians & Bicycles~|~700E7B96E4FE58339011FEBC0757DC3E0EC73922 105389~|~1~|~2~|~02/S>2~|~Smooth seal on urban route: CLA US 40 SLM 5.21 to 5.29~|~05 - 4R Maintenance - Resurfacing~|~C9F896E00D994E35A7902FB3B37408B391D76C1B 105389~|~1~|~1~|~01/STR~|~Smooth seal on rural route: CLA US 40 SLM 2.98 to 5.21~|~05 - 4R Maintenance - Resurfacing~|~81013568BD914BB2893BC05A3849B19A6CE15DD4 81716~|~1~|~2~|~02/NHS~|~ADA SR32 Rehab brdg 0100544 ADA SR32 23.4 Intersect: Scioto Brush Creek80/20 split~|~13 - Bridge Rehabilitation~|~AACD0B8251F8FEB4B7A89191388ACA26308EB4A7 81716~|~1~|~1~|~01/NHS~|~ADA SR32 19.85 - 24.85 Resurfacing Project~|~05 - 4R Maintenance - Resurfacing~|~E775E93950D156E14C89DF7A01DCDCB1BE0079FE 118585~|~1~|~1~|~01/ERD~|~RAISE Grant~|~~|~3CFF05F8F7AAA9F8161882CE76323F052EA0A318 113396~|~1~|~2~|~02/STR~|~WAY SR 0241 01.32-Culvert Inlet Work.~|~04 - Reconstruction - No Added Capacity~|~01E6B0BC2A28B15C74C7F278F34FA0E41183E241 113396~|~1~|~1~|~01/STR~|~The length of the project is WAY SR 0241 1.32 to 1.33 as this is a spot repair location.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~97262F49E3A242A7C688459FB18FB42B220B368A 116262~|~1~|~1~|~01/NFP~|~Resurfacing of W Park Dr from Old Furnace Rd to W Glacier Dr in Mill Creek Park.~|~05 - 4R Maintenance - Resurfacing~|~03761F3FA8C53570C79E3662C5B69512F63FA408 103424~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~0A903FBF8C43984693B8DAC8201489C14CF0EDFB 119226~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~FFE8BC120F9D30A656424E0E5B426EF0BCCC7DBC 101091~|~1~|~1~|~01/S<2~|~Reconstruction of Washington Ave (US 22) from Columbus Ave to Elm St. excluding surface course and pavement marking.~|~04 - Reconstruction - No Added Capacity~|~CF51FA061E9CE9FEFFD8C5CD86CDB1773F109B13 101091~|~1~|~2~|~02/S<2/WCH~|~Resurfacing US 22 from Columbus Ave to Corp line (08.36 - 10.33)~|~05 - 4R Maintenance - Resurfacing~|~106E0FF923287DC36ECB46FB2B37567BB38A6F73 101091~|~1~|~3~|~03/S<2~|~Resurfacing US 22 from 10.33 (WCH corp.) to SR 753 (10.47)~|~05 - 4R Maintenance - Resurfacing~|~9B6B20C3A6C90C912A889800AD54B9EB61C75A4F 121990~|~1~|~1~|~01/ENH~|~ADA compliant pedestrian improvements utilizing Federal TAP and Safety funding up to the CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~EC6C8B031B5C0EEDD4815783AAD7B3B3D65C4BF0 101479~|~1~|~1~|~01/STR~|~DSR# BEL-023~|~04 - Reconstruction - No Added Capacity~|~0F4630795968A4544C978637130A3D22ABC0D9BA 118650~|~1~|~1~|~01/S>2~|~Add sidewalk and extend walking path on both ends, resurface path ~|~21 - Safety~|~88C533319B127269CF597669EBF8E28C0F1B50AD 110291~|~1~|~1~|~01/NHS~|~Slide repair BRO 52 3.63~|~04 - Reconstruction - No Added Capacity~|~D5483166AC344707C3F5F4132C2ADB977764BA98 97614~|~1~|~1~|~01/STR~|~Rockfall hazard remediation. WAS 821 5.20-5.28. GSM funds. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9BF3D1D38B29172A1616167DE215D5359089EDF3 84289~|~1~|~2~|~02/NHS~|~Split for 100% local items not eligible for urban paving funds.~|~05 - 4R Maintenance - Resurfacing~|~AFFE2461650D94F4DC71979926B6726448D068DA 84289~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for urban paving funds~|~05 - 4R Maintenance - Resurfacing~|~CBB5BB1B9220131FC2314E7B988DB584D4219B3F 87031~|~1~|~1~|~01/SAF~|~District Wide contract to replace roadside delineators in FY2015~|~21 - Safety~|~57386B33803767F9E128248E236C2C55DF9A2747 101089~|~1~|~1~|~01/NHS~|~17 bridges~|~13 - Bridge Rehabilitation~|~58EEC4A70A0F4F9695E3F34FD2811108E0C2008B 105955~|~1~|~1~|~01/NFP~|~Improvements to SMART Center facility.~|~44 - Other~|~F7D5FC6B461A7BAE0AE6C2DC55BC2CCDDE7AEB36 125028~|~1~|~1~|~01/S>2~|~Plan split for preventative pavement management within District 12 utilizing state preservation dollars~|~05 - 4R Maintenance - Resurfacing~|~91BD2D0E80F28629017162C738621BA8286758D1 120689~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F076D3C236930998F4AEF380B79B0A49078AF519 123779~|~1~|~1~|~01/NFA~|~No Fed Aid~|~05 - 4R Maintenance - Resurfacing~|~2BCD06DF70810424B171A3C870E8502E69B97654 116880~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~23F60720070929D023755F4007D8B9377DBF1F2B 103780~|~1~|~1~|~01/BRF~|~JAC CR 39 3.06 (SFN 4030214).~|~10 - Bridge Replacement~|~E97A2DC53C245049CAC15D53CA58C1FAB6ABE7E1 89268~|~1~|~2~|~02/NHS~|~80/20 funding split for work in the NHS section that is eligible for State STP funds: SLM 0.14 to SLM 0.77.~|~05 - 4R Maintenance - Resurfacing~|~486379C270A59739AA0CC9AF88ACDB11E54B71D9 89268~|~1~|~1~|~01/S>2~|~80/20 funding split for wokr this is eligible for State STP funds: SLM 0.00 to SLM 0.14 and SLM 0.77 to SLM 1.68.~|~~|~5EA8A3AAD8CCBED8D72657FA90B62DDB4B281B88 85959~|~1~|~1~|~01/STR~|~2 Lane Resurfacing - SLM 0.00 to 9.41 and minor structure work:PIC-159-0170PIC-159-0422PIC-159-0624PIC-159-0868~|~05 - 4R Maintenance - Resurfacing~|~56D1A5735CD7F4B3957B5F69061485EB642268F6 119275~|~1~|~1~|~01/NHS~|~Repair various bridges throughout District Six~|~13 - Bridge Rehabilitation~|~5A2CF01834C4787F227DE93DB57916F6128199CB 113826~|~1~|~1~|~01/NFA~|~Split for SRTS safety work~|~21 - Safety~|~CBFDB7B89F4BB928E627ABBACDD4E1C34F6D7411 105514~|~1~|~1~|~01/SAE~|~District wide signal contract~|~21 - Safety~|~C76607F4E8248E262F554BDC299A983DE84C8A53 85161~|~1~|~1~|~01/S>2~|~Bridge Replacement, North Street CR10 2.08-2.09.~|~10 - Bridge Replacement~|~9C1BB5972EC7C12D2E4DCA1CDA64AF073E9E4887 106338~|~1~|~1~|~01/SAF~|~CLI CR 12 7.712-8.317 realign both the horizontal and vertical curve as well as widen pavement and berms.~|~21 - Safety~|~1327D77AABB15B254E3E73C858D072CC2D483E97 88969~|~1~|~1~|~01/STR~|~PIK SR 335 0.00-7.90SCI SR 335 8.41-11.27~|~05 - 4R Maintenance - Resurfacing~|~2D6C5C177651D166BFD523F6053022BE427136CA 88969~|~1~|~3~|~03/NFA~|~ODNR split to resurface headquarter lots at Pike State Forest and Scioto Trail State Forest.~|~05 - 4R Maintenance - Resurfacing~|~698E1F0CBCA6461B076B10E00B45CFEB99B6027C 88969~|~1~|~4~|~04/NFA~|~ODNR split to perform work at Ross Lake Wildlife area.~|~05 - 4R Maintenance - Resurfacing~|~7CB83F9B1A57D31E091C69E4E3C0CF2616165C6F 88969~|~1~|~2~|~02/S<2~|~PIK 104 12.04-12.66~|~05 - 4R Maintenance - Resurfacing~|~A143E82183F33D46C61C3613214721B684E2E5CC 88969~|~1~|~5~|~05/STR~|~PIK 335 5.80 (6602703)SCI 335 8.63 (7305044)~|~47 - Bridge Preventive Maintenance~|~9ACA3D27CDB3F3D222EE90A8CF294DCDC07F25EA 93463~|~1~|~1~|~01/BRF~|~Baldwin Rd bridge replacement over N Fork Paint CreekSFN 2431734, FAYTR121-0.20~|~10 - Bridge Replacement~|~604B9594BD087AAFF9DD807AE3B2BBD476716A5D 95124~|~1~|~1~|~01/S>2~|~Reconstruction and widening to provide left turn lanes~|~21 - Safety~|~66BE95FF535EF12C9C28722A22311195DE672501 95124~|~1~|~2~|~02/S>2~|~100% Local items for waterworks upgrades.~|~43 - Utilities~|~BE4579D983CA1F0494BE02BD3A94815DAB2E129B 102703~|~1~|~2~|~02/ENH~|~Bridge Aesthetics~|~13 - Bridge Rehabilitation~|~317861F40A0DBBBA79A301F6BC1DA386972629EB 102703~|~1~|~1~|~01/NHS~|~Bridge Deck Replacement: LOR-83-10.78 (SFN 4708431)~|~13 - Bridge Rehabilitation~|~40887E0359C080340CFD5FC8E36223CE8731108A 80746~|~1~|~1~|~01/BRF/HIGH~|~3632342 HIG TR194 1.48 Intersect: Brush CreekPlan Split for brdg replacement. Non Fed Aid, 80/20 split local match Highland, 01/BRF/BR/HIGH~|~10 - Bridge Replacement~|~E8B0AFA22F8CDB4564CED3E546CC015E97591040 117490~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 196-0.71 SFN: 0541540 Federal/State Exchange program.~|~10 - Bridge Replacement~|~CB0F9FD2D33DEBE733B207B1B8D390EFF9013C5E 126448~|~1~|~1~|~01/MPO/CLIN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DE260242FB2970D820C58642CC99A636D792CB90 126448~|~1~|~2~|~02/MPO/CLIN~|~Reconstruction, widening, curb and drainage improvements.~|~04 - Reconstruction - No Added Capacity~|~1347067D24DFF38CD84F5AD612D90B5E2F387E3D 99940~|~1~|~1~|~01/NHS~|~Various bridges.~|~13 - Bridge Rehabilitation~|~E9B22F4C0AD13A424E7B7C8B69BA547ADEBB4949 87204~|~1~|~1~|~01/STR~|~Resurfacing using rural STP funds. Funding from the District Preservation Program. 80% 4PF7 and 20% 4PS7. All work on US 127, SR 111 and SR 634. Work on SR 15 in Putnam County from the Defiance County line to the Ottawa-Glandorf Urban Area boundary at 16.33.~|~05 - 4R Maintenance - Resurfacing~|~EC93342510E20F5214B5F10B5FBD376C3AB6EB76 87204~|~1~|~3~|~03/NHS~|~Pavement repair using NHS funds. Funding from the District Preservation Program. 80% 4PF7 and 20% 4PS7. No local funds. Work on SR 15 from 17.80 to 17.94.~|~05 - 4R Maintenance - Resurfacing~|~962AF4D0187E0FB0EBBFA56C297A2168A4A0B9CF 87204~|~1~|~2~|~02/S<2~|~Work using urban STP funds. Funding from the District Preservation Program Program. 80% 4PF7 and 20% 4PS7. No local funds. Work on SR 15 from the Ottawa-Glandorf Urban Area boundary at 16.33 to the Village of Ottawa corportation limits at 17.09. Work on SR 65 in the Village of Ottawa from 8.54 to 8.63.~|~05 - 4R Maintenance - Resurfacing~|~5E10D8258345EB97F79F22FFDD7E10A128DAA8C4 111256~|~1~|~1~|~01/NFP~|~Resurfacing of the POR Triangle Lake Bog Nature Preserve.~|~~|~95550600299AD6F5EC1414436B89E655C9B56F1F 115158~|~1~|~1~|~01/NFP~|~Microsurface MED SR 162 17.190 - 24.08~|~05 - 4R Maintenance - Resurfacing~|~F5A5979ADD23A9A8B438B121D22D2339872DE725 116300~|~1~|~1~|~01/S<2~|~Chip seal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6ACF2E3BE16A176CA9DB4D2A271A9F1E616918C3 116300~|~1~|~2~|~02/STR~|~Chip Seal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C50DCB2AA98356D91FD7D1939041F0EB689104AA 116300~|~3~|~3~|~03/NFP~|~Added plan split for HIG-131-0.00-7.08 section.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B93C9A2C270F501DCF84C7499B9D2695552C9FE2 116300~|~3~|~4~|~04/NFA~|~Added plan split for added HIG-131 section.~|~17 - Construction Engineering~|~7C60CBDC98C945110B249264301F54A75FFE51DF 122823~|~1~|~1~|~01/MPO~|~City of Harrison EV projects 2026~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~9030147B23BA2F743C162FC10A3F7084683A86AF 110702~|~1~|~1~|~01/STR~|~All funding from this plan split using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~8B2386AAAC67A550137829520F509726F848420B 117016~|~1~|~1~|~01/CMQ/GPHC~|~Construction of shared use path connecting Winton Woods to Glenwood Gardens.~|~28 - Facilities for Pedestrians & Bicycles~|~29546868538E2AE32EAEE4BAF840FA28FB76E148 94489~|~1~|~1~|~01/S>2~|~The project will increase the vertical clearance between the Madison Road pavement and the bottom of the railroad bridge to 14'-3" from 12'-3".~|~13 - Bridge Rehabilitation~|~7A99B60DB5D6B4D6B7A26ABCB53A5A70C1035B4A 109999~|~1~|~1~|~01/S<2~|~Urban Area (STP<200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0EF8437A4FF95F229E99608D1CF5B4C0F411CC7F 109999~|~1~|~2~|~02/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E5044C2385DAFFB1518897BCA1DDCB7055838405 88556~|~1~|~1~|~01/S>2/AKRN~|~Intersection re-alignment. Along with full depth pavement reconstruction and narrowing from four sub-standard lanes to three lanes. Includes curbs, sidewalks, and signals. From Dayton Street to State Route 8 in the City of Akron, Summit County, Ohio.~|~07 - 4R Maintenance - Relocation~|~F4C229B2054E2857C83D9C0426B78F2F99D4DF39 121670~|~2~|~2~|~02/STR~|~PE ENVIR~|~~|~EE224EC9F8A16BC9A9B5BC0422ED172A7B50CBD7 121670~|~3~|~3~|~03/STR~|~PE ENVIR~|~~|~5E832EFB44A0F732E5CF114AC9B50ECAEADC6538 121670~|~1~|~1~|~01/NHS~|~Replace bridge over Treacle Creek and Rush Creek~|~10 - Bridge Replacement~|~81ABD3D24D4E6AA1A4410DFD52FE8182AD55B88D 98615~|~1~|~1~|~01/NFA~|~Upgrading existing Ethan Drive to accommodate a roadway extension alleviating traffic congestion in downtown Streetsboro.~|~03 - Reconstruction - Added Capacity~|~63385709DBC49499FBEFA2EA0553D864A4716C3A 110648~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 45 from 0.00 to 2.84 and 12.49 to 15.24.~|~~|~73775DAFC688FAAA6F369F8696B168BA75852617 96141~|~1~|~1~|~01/NFA~|~Construct a new 60' x 120' heated storage building at the Montgomery County Full Service Facility.~|~44 - Other~|~76BE9029E9A83F3B1CE88063366E328590D9B5DA 105607~|~1~|~1~|~01/NHS~|~NHS Plan Split - DEL-36-12.81 to 12.83 and DEL-36-17.64 to 18.03.~|~05 - 4R Maintenance - Resurfacing~|~8C9E277F825902FB029461CAED853FEE4A8CA0BF 105607~|~1~|~2~|~02/S<2~|~STP < 200000 Plan Split - MAR-95-17.19 to 18.31~|~05 - 4R Maintenance - Resurfacing~|~3AB1809D15FE522A9A465B63C3CC2274BB7FAF66 105607~|~1~|~3~|~03/S>2~|~Stp>200,000 Plan Split - DEL-257-0.77 to 1.5. Also, DEL-36-7.26 to 7.43, 8.68 to 8.81 and 8.83 to 9.04.~|~05 - 4R Maintenance - Resurfacing~|~4DBD812444655BF99A33D4AE6BA579BDBD490CA9 87373~|~1~|~1~|~01/S>2~|~Replacement of sfn#7801955 (TRU-45-1.30) over Norfolk Southern Railroad~|~10 - Bridge Replacement~|~9D1AB0C6C6A9B539BF5B6544250EEA08409CBB03 102818~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing BUT-126 between SLM 9.05-11.31~|~05 - 4R Maintenance - Resurfacing~|~D153409A0E1FA5352548FF69BE7C48B61B1C9A7B 116163~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into roundabout~|~21 - Safety~|~768E0ED6F9DAE587CA61927DD07AD489B09DA113 113901~|~1~|~1~|~01/NFA~|~Created for TID Involvement.~|~44 - Other~|~70FA0E1596D31429DA016B01166EA29288EE2327 112542~|~1~|~1~|~01/IMS~|~plan split for the resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~9950B9C65DE100AE9E7874A1B601866B5888B173 104666~|~1~|~1~|~01/SAE~|~Federal funds from the District Preservation Program budget SAC 4PF7. Work to install traffic signal which is eligible for 100% federal funding.~|~21 - Safety~|~DB86E38023A7A60DEDD9EF51E8AF55A9E0247A30 106588~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Licking County Engineer project to replace bridge Lic-CR668-9.02 (SFN 4536320)~|~10 - Bridge Replacement~|~891033EDE1093638485086801869CEDD396805CF 94903~|~1~|~2~|~02/IMS~|~I-675~|~17 - Construction Engineering~|~3F918A7483E7AA1BEC0B31384B931E0D86287405 94903~|~1~|~1~|~01/IMS~|~I-675~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~599B9A743E5544BC7C98297B2607C1B05912E860 97992~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP~|~~|~1FEB9982D11C27A6A2BC11266CC25DB27B5B1DCF 92993~|~1~|~3~|~03/S<2/MTVE~|~District Preservation Urban Paving 4PF7 (80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing on: 1) Kno-SR 229-07.17 to 07.28, 2) Kno-SR 229-08.48 to 09.53~|~05 - 4R Maintenance - Resurfacing~|~6A9A97025193E1074A07F4200EBC8811D815151A 92993~|~1~|~4~|~04/S<2/MTVE~|~Local Paving Costs 4BG7(100% Local) - No CAP - Locally Requested Items not Eligible for Urban Paving Funding on: 1) Kno-SR 229-07.17 to 07.28, 2) Kno-SR 229-08.48 to 09.53~|~05 - 4R Maintenance - Resurfacing~|~9A4BABE03AC63535B4887650427EAB01BACCBC92 92993~|~1~|~2~|~02/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Kno-SR 229-06.90 to 07.17~|~05 - 4R Maintenance - Resurfacing~|~D2B7344075F301EB9910C4D915AD9623F4902FFA 92993~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Kno-SR 229-00.00 to 06.90~|~05 - 4R Maintenance - Resurfacing~|~985ADC9B68EE26E3DDCAF3AD1FF0B5B0B776C71B 123130~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~FF48FE66864A5EB49BEB66301BD591AD89618B11 123130~|~1~|~2~|~02/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~37B93F9C3788049EF43CAB6624EF91616FA6F302 96818~|~1~|~1~|~01/NHS~|~Priority System resurfacing of HAS-22 from SLM 21.47 to SLM 25.23 including joint repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~54A71B2EBD5D7E340597A0670F804A47D85A3DA8 99747~|~1~|~1~|~01/IMS~|~Project inspection~|~17 - Construction Engineering~|~609340F360EFFD77BF731ADDABF9738DC6BCC914 110139~|~1~|~1~|~01/STR~|~AC Overlay without Repairs~|~05 - 4R Maintenance - Resurfacing~|~003BACC955A4028F0724D22B91EC4705E9B3A4D9 87945~|~1~|~1~|~01/IMS~|~90% fed/10% state funding split utilizing noise wall replacement program funding.~|~44 - Other~|~3EFAA34FFD07FB0A5536B40C25A0EB5FA4A12931 88633~|~1~|~1~|~01/NFA~|~Resurfacing from 0.00 to 4.84~|~05 - 4R Maintenance - Resurfacing~|~DC44A3A813BE2000E5EA89C8E37534C51533242C 102167~|~1~|~1~|~01/ENH~|~Walkway/bikeway~|~28 - Facilities for Pedestrians & Bicycles~|~27AA5F94ADDDBAAE509C9BA692C99EAB20168473 102167~|~1~|~2~|~02/ENH~|~monumental entrance sign gateway w/electrical and trees~|~28 - Facilities for Pedestrians & Bicycles~|~DFCB9A97A0BA033520F22EA966402482BD18CD65 92890~|~1~|~1~|~01/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~431C4E8305067CA9380AE7E0E1A53EBF7CEA4E9C 92890~|~1~|~2~|~02/S<2~|~Urban Paving - 80/20 - District Allocation/City of Wadsworth~|~05 - 4R Maintenance - Resurfacing~|~4321C00FA104E20D71B0CAA785750496B9065383 92890~|~1~|~3~|~03/S<2~|~100% City of Wadsworth~|~05 - 4R Maintenance - Resurfacing~|~8890932472B5982E1513D2F4E1C458ECDCAF0425 101303~|~1~|~1~|~01/NFP~|~Bridge cleaning.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~87BAD89209A8DEB35A8CE471C7056F7FA4C45F14 114432~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~3C7CE7E3AF0003C8D68388B0B4A9D36621255BC2 99707~|~1~|~1~|~01/IMS~|~Repair collision damage to bridge CLE-275-1163. Repair will involve heat straightening, painting, and crossframe replacement.~|~13 - Bridge Rehabilitation~|~775C511D930DBD6EAF814382BBA6C9093404A507 118729~|~1~|~2~|~02/STR~|~Two-lane resurfacing project on WAS CR 79 3.14-5.654. Funded 100% local. ~|~05 - 4R Maintenance - Resurfacing~|~2FA3EA9B4BAC8FBD536CD062200C759D22325A7B 118729~|~1~|~1~|~01/MPO~|~Two-lane resurfacing project on WAS CR 79 0.00-3.14 and WAS CR 271 0.02-1.25. Funded 80% WWW MPO STP (4TA7) and 20% Local.~|~05 - 4R Maintenance - Resurfacing~|~D4A9CE2BB73F2EE1711EBC26C78E9E446834B4ED 97536~|~1~|~1~|~01/IMS~|~Widening of IR-77 from four lanes to six lanes. Work limits are approximately Ghent Road to approximately IR-80 (Ohio Turnpike) in Summit County, Ohio.~|~~|~5025D319244BBF64C474EADED2E9D0A3B7B744FD 107905~|~1~|~1~|~01/MPO~|~Roadway resurfacing including enhanced pavement markings and an 18" aggregated berm.~|~05 - 4R Maintenance - Resurfacing~|~3A71824BAAA0B0C2F4600231AA105D0FE1D2259C 7466~|~1~|~1~|~01/MPO~|~Major widening~|~03 - Reconstruction - Added Capacity~|~136F5DF99E95BA027C29D833CAC93480BEBC06E6 115627~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 5.67, SFN 3701115 and HOC 180 2.34, SFN 3702766.~|~10 - Bridge Replacement~|~C69BD2BD8B8F892211FF695E945FD85B39B46878 126112~|~1~|~1~|~01/NHS~|~Landslide repair project using drilled shaft retaining wall. GAL 7 20.85.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B61FCBE4E26A6B4B6201017D2898978C381E8608 110486~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~21 - Safety~|~D3C180C390D1AE95B6168AC34EA9BAA6DE551760 87575~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation - No CAP - Location = 1600990 COS SR60 13.61 Intersect: Flint Run - - SFN 1600990 qualifies for replacement: Length - 23' - SD(1) - SR = 40.7~|~10 - Bridge Replacement~|~D00E7610C5C279177C909A0D00EA98704E464206 114729~|~1~|~1~|~01/NHS~|~Overlay on JAC 35~|~05 - 4R Maintenance - Resurfacing~|~9F3F4AB6B14887561B4112044CAC84BD27FF34B4 114729~|~1~|~2~|~02/NHS~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~7DCF08B06002CB491F2B8F33A695BEC5E0437E4F 91949~|~1~|~2~|~02/NFP~|~Upgrade of signal cabinets at several locations~|~21 - Safety~|~15268B607ACC1E6A4DBB453933940C30CF3F4FE0 91949~|~1~|~1~|~01/NFP~|~100% 4CP7/Maintenance Funds for 1 year~|~21 - Safety~|~7C26E88030BD6BDAC499111490B02C1028CF7399 115027~|~1~|~1~|~01/NFP~|~Signal improvements along Pemberville Road~|~44 - Other~|~0DDCFA29BCF698AB1F61DA334D72FA0F6D9345CB 120421~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT~|~17 - Construction Engineering~|~1CE1C6E98A0873B96BF284CE2829045ECF655FA8 102791~|~1~|~1~|~01/IMS~|~VGCS main span LED replacement~|~31 - Landscaping & Other Scenic Beautification~|~9DDB67776967ABB06DC67CB72CCC359D5DDB7F90 110158~|~1~|~1~|~01/NFP~|~Metropark funds plan split~|~05 - 4R Maintenance - Resurfacing~|~064B62D16FB23F0D5E94D885070DF6CD37F03839 102392~|~1~|~1~|~01/NFP~|~Resurfacing POR US 224 from 13.51 to 18.67 and POR US 224D from 0.00 to 0.08.~|~05 - 4R Maintenance - Resurfacing~|~610761412BF78009EDD91C3A015E92A63DB63777 102392~|~1~|~2~|~02/SAE~|~Adding Rumble Stripes.~|~21 - Safety~|~E2E63083C3F6DBEBE5552B74E553AE0BB60FBC78 102392~|~1~|~3~|~03/NFP~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~78C93B36A76A37A5F2793FC9865DB9807CF09730 102392~|~1~|~4~|~04/NFP~|~Culvert headwall repair.~|~04 - Reconstruction - No Added Capacity~|~0980FF3E143F465C264E08EA0E4249808D12F768 95110~|~1~|~1~|~01/ENH~|~The project will construct pedestrian facilities that access McDonald City School properties throughout the Village of McDonald, Trumbull County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~A0F350D9860D177D9F0342C0D12A59B94A46BABC 103469~|~1~|~1~|~01/NFA~|~The TID is constructing the Bethesda Drive Extension Project including, but not limited to, roadwork improvements by extending the Bethesda Drive.~|~01 - New Construction~|~09F38CCCA3AFEDAF8FC52A15546E09E4DCAC488D 83820~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 144 4.57-14.61. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~723C8557360F3947F892476BEA5690C5B67F6D42 82924~|~1~|~3~|~03/STR/Sani~|~Plan Split to cover the relocation of sanitary line.~|~43 - Utilities~|~740ABE5DA67EEEB2500E0052B2BE1DC12EF8B8FC 82924~|~1~|~1~|~01/STR~|~Resurfacing on SR-44 and SR-171, and replacement of culverts at STA-SR44-4.83, STA-SR44-4.97, Sandy Township and Osnaburg Township, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~B397F445FE529741369ACD2EAC26AADA25DB28D0 82924~|~1~|~2~|~02/STR~|~Minor structure work to SFN# 7601514, STA-SR44-4.26 over the Little Sandy Creek and SFN# 7601573, STA-SR44-6.85 over the Little Sandy Creek in Osnaburg Township, Stark County, Ohio. Structure work on STA-SR171-0.32 (SFN# 7605420) in the Village of Waynesburg, Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~E51D4C22BC45127C984C65B8FABB8EF3EB8D6DC3 105383~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: AUG SR 197 SLM 5.16 to 7.44 & AUG SR 362 SLM 0.00 to 0.78~|~05 - 4R Maintenance - Resurfacing~|~EB29D25BF88EB5824C7073A61BC3E0D610E1B0A4 105383~|~1~|~2~|~02/S<2~|~Smooth seal on small urban route: AUG SR 364 SLM 13.55 to 15.12~|~05 - 4R Maintenance - Resurfacing~|~41C18C5B016371D40957CE2A7BD712C82FA81020 115896~|~1~|~1~|~01/NFP~|~Split for non-federal bridge rehabilitation and replacement~|~04 - Reconstruction - No Added Capacity~|~7B7D1E1EFB40F846FEFC7D2C7F35A5FBA479EBF0 77801~|~1~|~1~|~01/IMS~|~HAN IR75 18.3-25.24 WOO IR75 0-19.92~|~04 - Reconstruction - No Added Capacity~|~5CC5AF3EA43D852D95E5B1A886A93EDEC9328ECD 116753~|~1~|~1~|~01/STR~|~Storm sewer plan split for storm sewer replacement on MAR-95-5.80~|~44 - Other~|~4A4A9822955EAC8C5ADEAB51A16D9FF7FE8FCC27 96228~|~1~|~1~|~01/NHS~|~Urban Paving NHS. SLM 5.68-10.51; 10.65-10.72~|~05 - 4R Maintenance - Resurfacing~|~103839D7DC3606E84BA29EB0B9B143215A5E8DE7 96228~|~1~|~3~|~03/S>2~|~2500590 FRA-23-7.96 Deck Overlay Non-BR eligible~|~13 - Bridge Rehabilitation~|~5F14FAC50AB13CC61B276084B4204681CD845D60 96228~|~1~|~2~|~02/S>2~|~STP Urban Paving. SLM 10.51-10.65~|~05 - 4R Maintenance - Resurfacing~|~7D7C755DAEBD067B35416CBE943AA325F4E3B275 118994~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~95FB7F86AE6387AD4BEE29DEF59436808A5397AA 109631~|~1~|~1~|~01/STR~|~Emergency Repair on BRO 41 2.09.~|~04 - Reconstruction - No Added Capacity~|~E5DD73F95BDD15D9FEC99E411E57C74E04AEF2D4 93432~|~1~|~1~|~01/CMQ~|~Signal coordination. Including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. From East Market Street to Eastwood Avenue, in the City of Akron.~|~21 - Safety~|~0D15D28826B95F88846C07730EF9CC138E740F7F 93432~|~1~|~2~|~02/NFP/akrn~|~In-eligible signal items.~|~21 - Safety~|~47E351CF77F78CC2B1C0AFE2E379E28E5CFA6F89 125299~|~1~|~1~|~01/NHS~|~Bridge repair - deck overlay~|~47 - Bridge Preventive Maintenance~|~F07622AD0450D264B6B58CED21897FDE510824E8 125514~|~1~|~1~|~01/STR~|~bridge replacement.~|~10 - Bridge Replacement~|~77B4B31104964FB27BD39D913AD0A87C14179D71 104259~|~1~|~1~|~01/NFP~|~MOWING~|~44 - Other~|~54A2696AB2F0AC429506F28F2CC555EFE8B745DD 91870~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~76A167F327D18DC4B1EFE71EBBE5CC44C990C4DB 91870~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~046793610E4F701F0A28B339F04995FBF5465BFD 95855~|~1~|~1~|~01/NFP~|~Culvert @ SLM 5.26~|~~|~72D958FFEDC2D1919EF5F8F838C9D7C12BC0F9E3 117642~|~1~|~1~|~01/BRF/GCEO~|~Replacement of the superstructure of Bridge PRE-TR 120-0.79 (SFN: 2932717).~|~10 - Bridge Replacement~|~B15EFFC786B11DE057A5E1C403B487825ED4B6D7 94504~|~1~|~1~|~01/NFP~|~This is the district's FY17 district wide lighting maintenance construction contract using 4CP7 sac code.~|~21 - Safety~|~251041559337EFBA2B548C10FE199072E471AEE8 98406~|~1~|~2~|~02/NHS~|~ERI-101-6.13 to 7.61 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1C944B8795F9DD59EFDDC02B3E27CCE7291BEFF3 98406~|~1~|~1~|~01/S<2~|~ERI-101-3.87-6.13 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5C0341CD8BF8258AADA277E336D86342036C02B2 98406~|~1~|~3~|~03/STR~|~Bridge work to be determined later.~|~~|~A008CB0CBF8AD67AF039BE66DAC276BF03D85C62 98406~|~1~|~4~|~04/STR~|~BRIDGE WORK TO BE DETERMINED LATER.~|~13 - Bridge Rehabilitation~|~319876BC0A12E68BA2579E8484831F5DA49D9257 100653~|~1~|~1~|~01/STR~|~Crack sealing various routes throughout District 11.~|~99 - State Preventative Maintenance~|~207EB4231EC4615E7CA9C052C0569914A426E4FF 98533~|~1~|~1~|~01/IMS~|~funding split for all costs associated with painting bridges HAM-126-1373L/R and HAM-129-1434.~|~13 - Bridge Rehabilitation~|~40F246BBB0C8F66E535C677E60432BF37A1C2CDC 98533~|~1~|~2~|~02/NHS~|~This plan split is for bridge repair on NHS route bridge (Bridge HAM-126-1373N over Anthony Wayne and HAM-126-1406 over Mill Creek)~|~13 - Bridge Rehabilitation~|~D82E6EF1AE12D05BC07C34C60ED000C01B37DF3E 81565~|~1~|~1~|~01/BRF~|~Bridge replacement project. ATH CR 28 0.14, SFN 0544272. Federal/State 95/5% using Credit Bridge.~|~10 - Bridge Replacement~|~4C75A3F1DD6F80D152DD57382220534D72479540 93446~|~1~|~2~|~02/IMS~|~Plan split to cover repairs to MSE Wall supporting IR 71.~|~13 - Bridge Rehabilitation~|~22BEE3D36DE3A1E64EAD7BA64183D2C1E77B058A 93446~|~1~|~1~|~01/IMS~|~Repair of existing noise walls on FRA-71 at 5th Ave. One wall is 5th Ave to 71 SB, One wall is 5th Ave to 670 WB.~|~17 - Construction Engineering~|~DAF4B80BA8913A721772F95CA0A8D53422AFBBCF 92027~|~1~|~1~|~01/BRO~|~80/20 fund split for bridge work using federal BHF funds.~|~13 - Bridge Rehabilitation~|~4F1D2A409AD65BF888660168CF9B4D452CB1A0FD 121889~|~1~|~1~|~01/MPO/RICH~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~47ABD80039B30A3994D9FCFF58823890928EFC1B 126120~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~80739AF41A48814142833D43C8AC90C102B038D7 115506~|~1~|~1~|~01/S>2~|~Split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~3DE6EEDF9E454FB0FE5A3D1658742FCE59CCF56A 104838~|~1~|~1~|~01/NFP~|~Split for pavement marking on the state highway system.~|~99 - State Preventative Maintenance~|~5E5963E56F89111C18CC2DF4893D3E2B357478A9 84090~|~1~|~1~|~01/ENH~|~Install sidewalks, street lighting, decorative pedestian lighting and improved pedestrian crossings on Stroop Road from Shroer Road to JCT of Southmoor Circle in the City of Kettering.~|~31 - Landscaping & Other Scenic Beautification~|~108EB39791F99EE4560953340E8671C228AC5916 108551~|~1~|~1~|~01/MPO~|~Lighting project along SR 183 in the city of Alliance.~|~21 - Safety~|~0364BD01824C054763F69A95AE40CDC23ECDA4CE 108551~|~1~|~2~|~02/ENH~|~Lighting project along SR 183 in the city of Alliance.~|~21 - Safety~|~BACE58115B82B90A1AF41BD21BE2BBB64278434B 88312~|~1~|~1~|~01/NFA~|~Guardrail placement/re-placement project on CR 2, 6 and 70. CEAO approved using HSIP. 100% Federal.~|~21 - Safety~|~7DEEF2899AB488BAF7AC308B5F6378D24F99C1CC 94237~|~1~|~1~|~01/STR~|~This is for crack sealing on rural routes.~|~99 - State Preventative Maintenance~|~D00F755CEAED0933C454DA774CB528834445DBEB 94237~|~1~|~2~|~02/NHS~|~This is for crack sealing on NHS routes.~|~99 - State Preventative Maintenance~|~9266DF76F71FB681E562408B14866F4CF2B1BC53 94237~|~1~|~3~|~03/S<2~|~This is for crack sealing on Small urban routes.~|~99 - State Preventative Maintenance~|~069A3ECDCA35F5A3BAF9F9EB16CBEF519F5FB0DD 94237~|~1~|~4~|~04/S>2~|~This is for crack sealing on Large urban routes.~|~99 - State Preventative Maintenance~|~F3F19D2813514810145B5792B15BFED50673B605 105400~|~1~|~1~|~01/STR~|~Bridge rehab of rural route bridge.~|~13 - Bridge Rehabilitation~|~97EB0DBCEAB38D19FBBD29D46EF1C8EB43DE1859 123558~|~1~|~1~|~01/IMS~|~Plan Split for preventive maintenance work on bridges located on the interstate system~|~47 - Bridge Preventive Maintenance~|~C09F37A819C36B587ABB6EFAC885D4241144E7DA 123558~|~1~|~2~|~02/NHS~|~Plan Split for preventive maintenance work on bridges located on the NHS system~|~47 - Bridge Preventive Maintenance~|~E72E3702465BD8AAE47485A4816D1CEC38751B06 123558~|~1~|~3~|~03/S>2~|~Plan Split for preventive maintenance work on a bridge located on the STP Urban~|~47 - Bridge Preventive Maintenance~|~2D68BE84D57E44785472475B4C316FE4D0D4E807 123558~|~1~|~4~|~04/STR~|~Plan Split for preventive maintenance work on a bridge located on the STP Rural system~|~47 - Bridge Preventive Maintenance~|~08F49C7690A4BF43B5A8CD26FC2CF703781C9FA1 97460~|~1~|~1~|~01/NFP~|~This is the district's annual auxiliary pavement marking project.~|~21 - Safety~|~6EE52084B202BD2ACBC01E606ACD7B241751047B 111977~|~1~|~1~|~01/STR~|~AC Overlay without repairs on:CLA-41 SLM 31.26 to 33.38CLA-235 SLM 6.16 to 8.75~|~05 - 4R Maintenance - Resurfacing~|~E70C5BDE8DA6AB20FD1B2E830F59934F018A8659 108085~|~1~|~1~|~01/STR~|~Plan Split for RPM's~|~21 - Safety~|~4531668BE147664F8C41181147433C8AF41DE89D 111352~|~1~|~1~|~01/NFP~|~Resurfacing of the Boat Ramp Parking Lot (Reisinger Rd) in the East Fork Wildlife area.~|~28 - Facilities for Pedestrians & Bicycles~|~10516417ED2B6304C953806D25BEA278EB41F923 118763~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~E64275E647B8C6BC1E17789F09F14D1FC6B43DB1 88668~|~1~|~1~|~01/NHS~|~PLan Split for the NHS routes int the project. This route is WAR-122~|~99 - State Preventative Maintenance~|~B1A66426C1EAF275DD4053CC5BB8FCF439592475 88668~|~1~|~2~|~02/S>2~|~Plan split for the route in the large urban area. This route is WAR-63~|~99 - State Preventative Maintenance~|~99186B6C7AC00E0D9CC47F70ACABA299487523BD 88668~|~1~|~3~|~03/S<2~|~Plan Split for the small urban area. This route is PRE-121~|~99 - State Preventative Maintenance~|~810F94594AF3FE6071B6530063A77631B892414D 88668~|~1~|~4~|~04/STR~|~Plan Split for the routes inthe rural areas. These routes are BUT-128, HAm-128, PRE-122, PRE-725, and PRE-732~|~99 - State Preventative Maintenance~|~C62CB32E86198723653A5B4C2EBEE83D0C0FB872 88668~|~1~|~5~|~05/NFP~|~Plan split for the route not on the Federal Aid system~|~99 - State Preventative Maintenance~|~3E92C5EC0E787EE76BA196DFFAA27ECB26773CEC 122971~|~1~|~1~|~01/MPO~|~Split for 2024 OKI STBG funding award to construct Phase 1 of the Ohio River Trail on the Oasis RR corridor. 2.1 mile section from the Montgomery Inn Boathouse to Gladstone Avenue.~|~21 - Safety~|~C2595837D0BEBFB237E0EF90013C5CE93CC55AC9 122971~|~1~|~2~|~02/MPO~|~Split for the 2025 OKI STBG award for construction of Phase 2 of the Ohio River Trail on the Oasis RR corridor. Phase 2 is 2.65 miles from Gladstone Avenue to Carrel Street.~|~21 - Safety~|~AE59B432EFB54312616BD0FEA7B258473DDAB845 88811~|~1~|~5~|~05/STR~|~Bridge Work - SFN 0305553 (ASD-511-15.97), SFN 0305561 (ASD-511-17.15), SFN 0305618 (ASD-511-18.54), SFN 0305642 (ASD-511-19.57), and SFN 0305715 (ASD-511-25.84)~|~13 - Bridge Rehabilitation~|~6116F74CA1F65BA0591B73FED26123D5A246E65F 88811~|~1~|~1~|~01/S<2~|~100% City of Ashland: includes pavement repairs, curb, curb ramps, sidewalk, city owned signs, guardrail - replacement and new locations within ASD 511 14.07 - 14.53.~|~05 - 4R Maintenance - Resurfacing~|~8396C75477CB238EA7A9791EEFB0A570BB552924 88811~|~1~|~3~|~03/S<2~|~District Allocation: ASD 511 14.53 - 15.28~|~05 - 4R Maintenance - Resurfacing~|~B1F975A540D3585A3BE10561A85C31D64D4C09D0 88811~|~1~|~2~|~02/STR~|~District Allocation; ASD 511 15.28 - 18.00, ASD 511 18.33 - 27.64, and ASD 302 10.84 - 11.22~|~05 - 4R Maintenance - Resurfacing~|~F32DEA9BD66DCB57B9D2A73F92052B5C518F44E5 88811~|~1~|~4~|~04/S<2~|~Urban Paving - 80/20 - District Allocation/City of Ashland; ASD 511 14.07 - 14.53~|~05 - 4R Maintenance - Resurfacing~|~F58B8359450B0A8EA4758EC4AF5A98CEC3F4F8F4 93702~|~1~|~1~|~01/S>2~|~80/20 split between federal and local for the resurfacing of Kirtland Road using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~04DFDEF1F3676DF23888E4DE5F72E3CAC2195F25 93702~|~1~|~2~|~02/NFP~|~Work items not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~C3147C4B7209D43C386941240A3902E57FF1CFBE 104438~|~1~|~1~|~01/MPO~|~plan split~|~04 - Reconstruction - No Added Capacity~|~F92C86D01D98E69052F69C8EF752CE1A27D98058 108048~|~1~|~1~|~01/STR~|~Maintenance funds to replace UPS batteries, relamp signal heads, and replace signal heads~|~21 - Safety~|~C02BE0E0C8E6ECAA8C22D448D165436A97EE77EF 110441~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - OFAH Rural for KNO 586 0.00 to 3.28 & 3.41 to 11.37~|~05 - 4R Maintenance - Resurfacing~|~2438CBB0D7484BC9D3F7D2D7BECB6AD2543A7650 110441~|~1~|~2~|~02/S5K~|~Plan Split 02/S5K/PV/ - OFAH Urban for KNO-586-11.37 to 12.92~|~05 - 4R Maintenance - Resurfacing~|~5F3D22B5511226A9AABB9A872F2680A0826FDC5B 110441~|~1~|~3~|~03/S5K/MTVR~|~Plan Split 03/S5K/PV/MTVR for KNO-586-12.92 to 13.98~|~05 - 4R Maintenance - Resurfacing~|~931DFAEAE76CF3E195DF1AF22C0FE540DC1A05DF 93028~|~1~|~1~|~01/IMS~|~Painting of Five Interstate Bridges:7702760 CATAWBA AVEN - 10.207702825 COLE AVENUE - 11.287702914 LOVERS LANE - 11.507702949 LAFOLLETTE AVE. - 11.847711220 SR 764 - 02.14~|~13 - Bridge Rehabilitation~|~D21B1054575730560C9878752B0A3B24E6C2239D 98929~|~1~|~1~|~01/S<2~|~SR-25 and SR-64~|~04 - Reconstruction - No Added Capacity~|~B385822ECA23A3BE04EF4CD62DDE613B86E1BD09 119996~|~1~|~1~|~01/NFP~|~Plan split for ITS maintenance~|~99 - State Preventative Maintenance~|~83FE69E9E80ADE36DA2A86AED1D200AC0A3018DB 119083~|~1~|~1~|~01/NHS~|~Plan split for project to Replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. ~|~13 - Bridge Rehabilitation~|~A92AA87D60FD8BB498050C7F94C7B4BBD7A1156C 119355~|~1~|~1~|~01/BRF~|~CEAO LBR - BFP funded at 100%~|~10 - Bridge Replacement~|~00AB1F8650916BEC7E4A73E5805E21390B140BB9 99390~|~1~|~3~|~03/NFA~|~Culvert replacement project. MOE 255 7.33 and 8.65.. Not on any federal aid system funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~EBA58CA0BD792B3BE5B6105E8CE506823983DE9D 99390~|~1~|~2~|~02/NHS~|~Culvert replacement project. MOE 7 6.59, 15.86, and 23.97. NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~04BB965A76F296B68FA40FAD0E11E0D98D531C32 99390~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations: MOE 26 3.78, 16.21; MOE 78 3.29, 13.49; MOE 145 17.03, 23.80; MOE 800 21.01; WAS 26 16.23, 26.36; WAS 339 1.76, 4.09, 10.57, 14.73. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~12900175ADFA3FDE494CA3905FD629C688E26627 99390~|~1~|~4~|~04/STR~|~100% State split added for extra work on utility sub-phase.~|~~|~9BC5B583D9D1F094EEFD80051C9EE85DD6D05CA1 122848~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3A3629295D2C4BB6AA6B18021D56E97E34EED8A9 88840~|~1~|~1~|~01/S<2~|~This is for work outside the City of Lima but inside the Lima Urbanized Area but not on the NHS. All funding is from the District Preservation Program budget 80% SAC 4PF7 and 20% SAC 4PS7. There are no City of Lima funds in this split. It is for SR 117 from 12.73 to 13.06 and from the SR 117/SR 309 intersection at 18.75 to end of the project at 19.14.~|~05 - 4R Maintenance - Resurfacing~|~4A86CD5528712B31CB9C18D1817A5F6EF8238BA3 88840~|~1~|~2~|~02/NHS/LIMA~|~This is for resurfacing work inside the City of Lima on the NHS. The City of Lima will provide the 20% non-federal match. The 80% federal funds are from the District Preservation Program budget SAC 4PF7. All resurfacing on SR 65 and SR 81 is in this split. It is also for resurfacing on SR 117 from 14.06 to 14.43 on the left side of the road, on both sides of the road from 14.43 to 14.47 on the left side of the road from 14.47 to 14.87 and 14.87 to 15.34 on both sides of the road. Resurfacing on SR 309 from the corporation limits at 11.17 to 11.80 is also in this split.~|~05 - 4R Maintenance - Resurfacing~|~23784F11B2387875EFB55EAFCAE7EF8700685E32 88840~|~1~|~4~|~04/NHS~|~This is for work outside the City of Lima but inside the Lima Urbanized Area and on the NHS. All funding is from the District Preservation Porgram budget 80% SAC 4PF7 and 20% SAC 4PS7. There are no City of Lima fudns in this split. It is for SR 117 from 13.06 to 14.06 on both sides of the road, from 14.06 to 14.43 on the right side of the road and from 14.47 to 14.87 on the right side of the road. This split is also for work on SR 309 from 10.98 to the City of Lima corporation limits at 11.17~|~05 - 4R Maintenance - Resurfacing~|~A216C11D413EA8FB2FE7802C9DEC1987A5CD75D7 88840~|~1~|~3~|~03/NFP/LIMA~|~Curb ramps, full and partial depth repair and aux. pavement markings in the City of Lima. The first $35,000 will be state funds from the District Preservation Program budget SAC 4PS7. These funds are to compensate for damages to local streets from damage casued by the ALL-75 project haul routes. After the first $35,000 all funds will be provided by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~BE2D022EE1142EB97E47862ADEF33A2BE43A3DC9 98635~|~1~|~1~|~01/NHS~|~SFN 4600363, LOG-33-1069 - remove structure and fill in with embankment material and new roadway section. Railroad is no longer there; therefore, bridge is no longer needed. DO NOT REPLACE BRIDGE.~|~04 - Reconstruction - No Added Capacity~|~3D1ECC14211DA3235E1E71B353313A3FDF4D44D7 118719~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 50 24.23-30.66.~|~05 - 4R Maintenance - Resurfacing~|~2D6C34DA495134F7484D7780734B5673F11D1B25 121297~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2030.~|~21 - Safety~|~B392F952DA2CDDA3717911AEF01983976F89F92F 113186~|~1~|~1~|~01/SAF~|~Friction treatment and curve warning signs at Faraday Road from President Drive to Cass Avenue~|~~|~03D67A3E4C094C63FECDD411C964002DDF6D23D3 112040~|~1~|~1~|~01/SAF~|~Intersection improvements at Dressler Rd/Everhard and Dressler Rd/Belden Village St.~|~21 - Safety~|~45664B269C1861AB1F5C42A714ED4287452521FA 112040~|~1~|~2~|~02/S>2/NCAN~|~North Canton waterline work.~|~43 - Utilities~|~300809AD22461E55ABBF7B20762C5850E4866153 125580~|~1~|~1~|~01/IMS~|~Replace bridges with smaller ones.~|~13 - Bridge Rehabilitation~|~34E54A686A71FDE157408AD541E80C6500EE219C 123020~|~1~|~1~|~01/STR~|~Intersection plan split.~|~21 - Safety~|~924A844B3EA3BF758956ABCC0A4B2BBBCE7C3DFD 92649~|~1~|~2~|~02/S<2~|~Overlay with asphalt concrete SR 66 in Shelby County:SHE SR 66 11.10 to 14.33~|~05 - 4R Maintenance - Resurfacing~|~3623A58C7A02E69D4961490C6BB4C7A76E7B5F2F 92649~|~1~|~1~|~01/STR~|~ Overlay with asphalt concrete SR 66 & SR 219 in Shelby County:SHE SR 66 SLM 8.08 to 11.10SHE SR 219 SLM 0.00 to 0.76~|~05 - 4R Maintenance - Resurfacing~|~7CB0E6E8D2398126F2110B59D22912F5F906AAD4 119221~|~1~|~1~|~01/IMS~|~Mowing in District 8~|~44 - Other~|~DA7C1169FFDDDC75A4621B5E0B8B5F980280AEF1 119221~|~1~|~2~|~02/IMS~|~Mowing in D7~|~44 - Other~|~86455B0F9A8604D4A056801313B114DF6B0F2909 99855~|~1~|~1~|~01/NFA~|~REbuild deck edges with anodes. Remove and replace asphalt wearing surface and waterproofing. Reface abutment walls (no anodes). Encase pier columns, rebuild wingwalls, seal concrete work and on SFN 4602889 patch pier cap with SCC.~|~13 - Bridge Rehabilitation~|~66E236F184AB3096D750F2621FABE6D486E8EC61 99855~|~1~|~2~|~02/S<2~|~Rebuild deck edges with anodes, encase pier columns and seal concrete work.~|~13 - Bridge Rehabilitation~|~25511FFF87096238ED657056AE24AE13536BD981 99855~|~1~|~3~|~03/STR~|~Bridge rehab on rural bridge.~|~13 - Bridge Rehabilitation~|~C289D804F52656F211A8BE4F0726C99CE846B673 113239~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work.~|~05 - 4R Maintenance - Resurfacing~|~4A1F8B1EB8257CE0993B2ECAC43DCF87C41546FA 121286~|~1~|~1~|~01/NFA~|~Culvert replacement project. GAL 790 3.32, CFN 1820235.~|~~|~811BC29FCB9C43C9AEFE99FB5522A5FF472871EC 97704~|~1~|~1~|~01/IMS~|~Bridge painting project and beam repair. WAS 77 1637 L (SFN 8403511), WAS 77 1637 R (SFN 8403546), WAS 77 1687 L (SFN 8403570), and WAS 77 1687 R (SFN 8403600). Interstate route funded 90 federal/10 state.~|~47 - Bridge Preventive Maintenance~|~1C0B1EF4D76F0D153828709CC5F65E24F695E8EE 111400~|~1~|~1~|~01/S<2~|~Small City Program Funding for SR 61 reconstruction project (FY2023)~|~04 - Reconstruction - No Added Capacity~|~5B6A1811E49ECD1AE98803A0E455DE251051FE6A 111400~|~2~|~2~|~02/S<2~|~District Urban Paving Funding to participate in the paving per the urban paving guidelines~|~05 - 4R Maintenance - Resurfacing~|~7A704EFFC0180119E827BE58DD89D10FBE417526 19794~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal)/4PS7(20% State) - No CAP - for bridge painting on 1) 1600761 COS SR60 6.91 Intersect: Little Wakatomika Creek and 2) 1601091 COS SR60 24.04 Intersect: Killbuck Creek~|~13 - Bridge Rehabilitation~|~158CCCE2ED3364F45D0D5BE3C098ABA36D7042EC 19794~|~1~|~2~|~02/S<2~|~"02/S<2/BR/ " - District Preservation 4PF7(80% Federal)/4PS7(20% State) - No CAP - For Bridge painting on 1) 2300257 FAI US22 13.58 Intersect: Hunters Run and 2) 6006280 MUS SR555 11.34 Intersect: Over Muskingum River~|~13 - Bridge Rehabilitation~|~460F72E866160DE74FCD15227433729311023E73 19794~|~1~|~3~|~03/NFA~|~"03/NFA/BR/ " - District Preservation 4PS7 (100% State) - No CAP - For bridge painting on 6005276 MUS SR208 0.87 Intersect: Over Muskingum River~|~13 - Bridge Rehabilitation~|~A485EB7BC9073C890BACB7F3CC9A422615804530 102651~|~1~|~1~|~01/S<2~|~Bridge Replacement: HUR-547-7.25 (SFN 3904326)?Structure(repl) (002)~|~10 - Bridge Replacement~|~013C5B21F4CF42F2489DE2BE3316F31ABCB6AACC 121573~|~1~|~1~|~01/S5K~|~Urban Paving Plan Split for resurfacing costs~|~05 - 4R Maintenance - Resurfacing~|~6009785971A25413ED0E33BC6CEC883433443EDA 121573~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope items, such as full depth pavement repairs and any work associated curbs, curb ramps, and sidewalks.~|~~|~623C449269911B9F6376A8BC4CFA337C7D24C3AD 113614~|~1~|~1~|~01/SAF~|~Rehabilitation and replacement of sidewalk improvements to include signage, marked crosswalks and bike racks.~|~28 - Facilities for Pedestrians & Bicycles~|~157B6DFCE1C6419AD2537777E8C7153B84C96419 121203~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items on southern section of main street (South of Ohio Ave).~|~05 - 4R Maintenance - Resurfacing~|~FAD993865AB2BAB77D1399E2268E120D60EA4E1B 121203~|~1~|~2~|~02/MPO~|~Plan split for federally eligible work items on northern section of Main Street. (North of Ohio Ave)~|~05 - 4R Maintenance - Resurfacing~|~4F5C3D9E153CC17C576229FEC9941E24D1A99598 112862~|~1~|~1~|~01/NHS~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Cos-US 36-26.42; 2) Lic-SR 16-12.74~|~21 - Safety~|~173FD3031F4107B84E11BF4098F405772A3533CA 112862~|~1~|~2~|~02/S>2~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Lic-US 40-2.71;~|~21 - Safety~|~6721DE828F91D9FBA0D1D85B51121592026EFCE7 112862~|~1~|~3~|~03/S<2~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Fai-SR 37-12.60; 2) Mus-SR 719-0.15; 3) Fai-US 22-12.86;~|~21 - Safety~|~70377A9D3D0BC3F7A724CE3F82417F975C6EB4AF 112862~|~1~|~4~|~04/STR~|~District Preservation Other Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Conversion of Signal Cabinet from pole Mount to Ground Mount at 1) Mus-SR 60-8.86; 2) Lic-US 40-19.58~|~21 - Safety~|~73F481CADE997D88AE72D8DF2D8720CD4E7F9DA3 114745~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~76CFD760EDFC691EC75D882DE5C294C4C0FC69C1 114745~|~1~|~2~|~02/NHS~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~013362198F7A42A27C87491A29AFD28C2065D469 126437~|~1~|~1~|~01/NFA~|~Created for J&C Involvement.~|~44 - Other~|~90ED028D9854C76BB1740E715DA505E3BB768553 122822~|~1~|~1~|~01/MPO~|~City of Hamilton EV projects 2026~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~A0CDE7C8B966FD2BBA0CBEE248E0E595E7DBE018 102045~|~1~|~1~|~01/NHS~|~Slide repair on JAC 32 16.58.~|~44 - Other~|~F7BE7A45245D9A29BDDEAA0C6CB36F9EA1E92B0D 102045~|~1~|~2~|~02/NHS~|~Culvert replacement on JAC SR 32 16.60 (CFN 1971977)~|~04 - Reconstruction - No Added Capacity~|~E61BDD0DDFBF0B43BD78D1C87E277A0F9B443D6D 106717~|~1~|~1~|~01/SAF~|~plans split for project~|~21 - Safety~|~DED70FBB848D3A3F89038EE47037907F60B8E356 114476~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~4360AA121E0AA5A50647804F4E6008B17846D44A 92150~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 2 years mowing contract~|~31 - Landscaping & Other Scenic Beautification~|~787F37A4D41EB9D0E6EC55DA415F6B07EC64E7A3 97910~|~1~|~1~|~01/ENH~|~West Third Street from Paul L. Dunbar to Orchard Ave - The project will consist of replacement of defective sidewalks and curb ramps, and the installation of banners, trash receptacles, bike racks and other assorted amenities.~|~31 - Landscaping & Other Scenic Beautification~|~ECDAF8CC7D580C8F698706EA45E01884A1CCA9B6 107954~|~1~|~1~|~01/IMS~|~Landscaping upkeep and maintenance on the I70/I75 interchange.~|~31 - Landscaping & Other Scenic Beautification~|~7B563B3E9C5BD16CF6E35AC2764D907451057EF6 112229~|~1~|~1~|~01/NFA~|~D09 Guardrail Project FY2026.~|~21 - Safety~|~9E64D71042DE23AE2A4B73702C1C34236247E25D 122824~|~1~|~1~|~01/MPO~|~OKI CR Funding (SAC 4CD7). Construction phase cap set at $454,582.00 with a 20% match (TRC)~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~53167845DE98AE271F2980DC8C0101634D0FC8D4 97871~|~1~|~1~|~01/SAF~|~Intersection improvement project to create a double roundabout. MRG 37 9.59-9.83, MRG 60 12.31-12.47, and MRG 669 19.42-19.45. Includes both municipalities on either side of the bridge (Malta and McConnelsville).~|~21 - Safety~|~D503616003A7FF2B2BF97646E05C366B71473A23 97871~|~1~|~2~|~02/STR~|~Concrete bridge deck overlay. MRG 37 9.71, SFN 5800129. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~91A787D3DA805A0BF345672867F188BC21BDAC7A 97871~|~1~|~3~|~03/ENH~|~Construction of a 5 foot wide walkway on the south side of the bridge (MRG 37 9.71, SFN 5800129) that includes railing and lighting. TAP and 4BG7 funds.~|~21 - Safety~|~4D2F2B006704C58D17378AB7640044A9B9B0F03C 98505~|~1~|~2~|~02/STR~|~Resurfacing TRU SR 193 from 6.78 to 7.18 and 9.57 to 14.91.~|~05 - 4R Maintenance - Resurfacing~|~E19CA50A367A158E235370850398369556FCEE85 98505~|~1~|~1~|~01/S>2~|~Resurfacing TRU US 422 from 17.53 to 18.93 and TRU SR 193 from 7.18 to 9.57.~|~05 - 4R Maintenance - Resurfacing~|~5944C9E228B182CE6331FEE40FCAF631EFF124DB 98505~|~1~|~3~|~03/STR~|~Change Order work associated with Tim Horton's access management corrections.~|~05 - 4R Maintenance - Resurfacing~|~F3928638417FD642AAA2D84091D1BD2994DEBFA8 121603~|~1~|~1~|~01/MPO~|~Construct asphalt multi-use path along roadway.~|~28 - Facilities for Pedestrians & Bicycles~|~AF1511E63672A57D3B0BB00C07C689513C5C48A1 102380~|~1~|~1~|~01/IMS~|~Guardrail repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3455B69A85E19E2919B0504421E1FA8DE13B0DF8 102380~|~1~|~2~|~02/IMS~|~Type A guardrail installation.~|~21 - Safety~|~48A0E14DC88D774C5741602F459A5F036F6F8EB2 102380~|~1~|~3~|~03/IMS~|~Guardrail repair in Montgomery County~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5616F24A2BFB2F0F761A9B02C41C908395539901 122496~|~1~|~1~|~01/MPO/CANT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0543E7D4F6C3427BC976AD1A59B38E77E6CD92EC 116737~|~1~|~1~|~01/IMS~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~341D7AF4F2E42E0965ECF8D8EEC3683456DED6E6 113404~|~1~|~1~|~01/NFA~|~Install/replace raised pavement markers on various county roads throughout Fayette County~|~21 - Safety~|~8645BF207E340DC2C55C96B0081C4F1FAD40AD34 111085~|~1~|~1~|~01/NFA~|~Repair structure HOL-179-0395 (SFN 3802124) by replacing the existing slab and approach slabs. Project will also rebuild the abutments above the footing, upgrade the bridge railing, encase the pier piling and replace the RCP. Full depth pavement replacement from the railroad tracks to the intersection with S.R. 226 will be required.~|~13 - Bridge Rehabilitation~|~FDB2D519F58AF774C6F79507A09F7B04381957B4 112751~|~1~|~1~|~01/NFP~|~Reactive Maintenance.~|~05 - 4R Maintenance - Resurfacing~|~8994EBB10A3AA080E045ACABE5C22BB69CBAFC3A 114108~|~1~|~1~|~01/STR~|~Two-lane resurfacing project on WAS CR 32 0.00-3.81 and CR 102 4.13-4.84.~|~05 - 4R Maintenance - Resurfacing~|~67B52230598071EA39280FE484925B4E135BA4E9 93140~|~1~|~2~|~02/NFA~|~PLan Split 02/NFA/PV/ - District preservation 4PS7 (100%) - No CAP - Resurfacing on Gue-313~|~05 - 4R Maintenance - Resurfacing~|~156A1DA594DF85DD80CC1E85E0B1B237CD6D14D5 93140~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Gue SR 313.~|~05 - 4R Maintenance - Resurfacing~|~1EE855F3791284D1E2F51D2E41257ACAAF3D1355 88980~|~1~|~2~|~02/STR~|~BRO SR125 Brdg F/Rehab:0802336 BRO SR125 12.290 0802387 BRO SR125 17.720 0802395 BRO SR125 17.980 0802417 BRO SR125 18.110 0802441 BRO SR125 18.220 0802484 BRO SR125 19.650 0802506 BRO SR125 20.500 80/20 split~|~13 - Bridge Rehabilitation~|~7211C60B2A6704B0B5EB6C5A5B19F06A3ED30BE2 88980~|~1~|~1~|~01/STR~|~BRO SR125 11.86 - 22.93 resurfacing projectBeginning at the intersection of SR125/US68 and terminate at the Adams County line (11.07 miles), it is proposed to resurface the existing asphalt highway.SR 125 SLM 11.86 - 22.9380/20 split~|~05 - 4R Maintenance - Resurfacing~|~FEEE7554733F9879CB835BBDE0D875C5B82E8AEA 96070~|~1~|~1~|~01/NHS~|~"01/NHS/OT " - Plan Split for Construction of a Pole building for loader storage at the Knox County Quaker OP~|~44 - Other~|~24BF654FF937FEB9101DF4D59754BD76BA804F1F 122065~|~1~|~1~|~01/NFP~|~Plan split for Franklin County ding and dent guardrail on various routes.~|~21 - Safety~|~2B46D4A8A219913519ADAE1824421E3B1B7338C2 95775~|~1~|~2~|~02/S5K~|~SEN-53 from SLM 7.152 to 8.35 and SLM 11.08 to 11.565~|~05 - 4R Maintenance - Resurfacing~|~C16D1DB6914D44550FD9EBD9E0FF97375DC947AA 95775~|~1~|~1~|~01/STR~|~SEN-53 from SLM 0.00 to 2.87; SLM 7.14 to 7.152; SLM 11.565 to 19.24~|~05 - 4R Maintenance - Resurfacing~|~A22A445A069FA30A379DF827E342A90D284970A7 97314~|~1~|~1~|~01/STR~|~LAW CR 5 & CR 29 resurface~|~05 - 4R Maintenance - Resurfacing~|~B8160498787CDC29B366EAEB7EFC204B383AF201 91953~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance Funds for one year~|~31 - Landscaping & Other Scenic Beautification~|~1607BD91A9769937A635AE94BEEC77745E049D57 97015~|~1~|~1~|~01/NFP~|~Lighting maintenance project.~|~44 - Other~|~547C94D36672E88B0E73B231469E6035FAF609AC 119331~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E56A89E1EF4BB52B163275712CCD4F234A4006BE 111860~|~1~|~1~|~01/NFP~|~Chip-sealing of existing park drives at Lost Creek and Maple Ridge.~|~28 - Facilities for Pedestrians & Bicycles~|~2085B3FECF0459146FFBEA0FF4F5B90B88031746 109832~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order.~|~~|~674C22CCA84A0A1D6F1D164BB23A1476D0696A98 107800~|~1~|~1~|~01/NFP~|~FAY-729-6.61 to 9.67 FAY-729-10.50 to 14.82 FAY-734-6.78 to 12.56 MAD-729-0.00 to 1.75~|~05 - 4R Maintenance - Resurfacing~|~CA432C2BF73F4BFC4674D49034C2048DCB0BD77C 107800~|~1~|~2~|~02/STR~|~FAY-729-0.00 to 5.44~|~05 - 4R Maintenance - Resurfacing~|~6FE6AD44047A21FD63560A7A6BD8C9D25D24D9B4 124944~|~1~|~2~|~02/MPO~|~Plan split for Neeb Road awarded funds~|~05 - 4R Maintenance - Resurfacing~|~3929132F924FAD533BCDA5B9F6783B0B8964490B 124944~|~1~|~1~|~01/MPO~|~Split for Newtown Road award~|~05 - 4R Maintenance - Resurfacing~|~7CD3674478864A1E7EDCCB3DF5B28879AF3CC324 124944~|~1~|~3~|~03/MPO~|~Plan split for 100% local items.~|~05 - 4R Maintenance - Resurfacing~|~4156F590E5E92D2340BBAD50709485B8E0A86AED 107576~|~1~|~1~|~01/IMS~|~Mowing contract for SFY 2021.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EBC4B4F8FB0B2C167C4506D4A4FD30D52AA93EE3 107576~|~1~|~2~|~02/IMS~|~Mowing Contract in D7 on:MOT IR 675 SLM 0.00 to 7.44MOT IR 75 SLM 0.00 to 9.31~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E102CDDAAD5F748C4BEBA656111BF205DF722B76 105270~|~1~|~1~|~01/NHS~|~Bridge replacement project. ATH Richland Ave 0.83, SFN 0560073. NHS route funded 95 federal/5 local.~|~10 - Bridge Replacement~|~BFF1C177FA69538BE2E2061655433272A1AAABB4 105127~|~1~|~1~|~01/STR~|~Culvert replacements~|~04 - Reconstruction - No Added Capacity~|~BB660F9D8EAA0A536B2571A7D21E10D00D9F629F 105127~|~1~|~2~|~02/STR~|~Water line relocation~|~04 - Reconstruction - No Added Capacity~|~1BDBB8C1D3AE9119AEFF68FE947357FA0D94EB1A 98805~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for elgible resurfacing work items.~|~05 - 4R Maintenance - Resurfacing~|~F0F54D494BC9E5885761CE7709E09AF4A345F1B8 76461~|~1~|~1~|~01/NHS~|~SCI US23 11.48 - 16.68~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~07C5688AE8BA8EF9FE849EFA3FFC0A4D9538E0E8 76461~|~1~|~2~|~02/NHS~|~Bridge Preventative Maintenance SCI 23 12.79L 7300336SCI 23 12.79R 7300360~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C3467B5CBCF86C6B9BE76CE015AFB0D43B45E1C9 114575~|~1~|~1~|~01/STR~|~Overlay on ROS 772.~|~05 - 4R Maintenance - Resurfacing~|~50A9698F1A28FD4079B1316B388A46AC4D5B4EFF 114575~|~1~|~2~|~02/S<2~|~Overlay on ROS 772~|~05 - 4R Maintenance - Resurfacing~|~06F5F7EF51441375BC8DA24F74728D5AC559BEA1 114575~|~1~|~3~|~03/S<2~|~Overlay on ROS 772. Local match~|~05 - 4R Maintenance - Resurfacing~|~EBC3C509C33DD4CB6D8EBF6607CC6D7D16A4B0CD 114575~|~1~|~4~|~04/S<2~|~100% local~|~05 - 4R Maintenance - Resurfacing~|~42D1AE93F5B24F985988BA35C6E23C5F33FE0C8D 114575~|~1~|~5~|~05/S<2~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~0A561FEB845EC7CE8BB5C70FFB3697A2D0106064 113717~|~1~|~1~|~01/SAF~|~Improvements at the I-75 and SR-73 interchange including dual left turn lanes to the SB entrance ramp, right turn lane on the NB exit ramp, side mounted signal heads on SB exit ramp, right turn lane to Sharts Dr and a multi-use path along the south side of SR-73 to Conover Drive.~|~21 - Safety~|~6345E7B257A472F10337CA52B928D278CB43EEB6 119429~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs ASD-96-0.00 to 3.521, ASD-603-3.62 to 11.574, RIC-603-4.72 to 9.36~|~05 - 4R Maintenance - Resurfacing~|~F7D7E748ADA3C33E73F7CCBC80415F96BB014D4B 119429~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs ASD-96-3.521 to 3.905~|~05 - 4R Maintenance - Resurfacing~|~61F276004356601E6747DE26E571632A4C58D6E9 123770~|~1~|~1~|~01/BRO~|~Bridge Overlay project~|~47 - Bridge Preventive Maintenance~|~543B69AE636EFD63CCD9332336FA92B7F2130227 107693~|~1~|~1~|~01/IMS~|~Replace the rigid overlay in the SB direction of the HAM-75-0173 and 0219 bridges over Liberty St and Banks St respectively.~|~13 - Bridge Rehabilitation~|~C3AB17A1E2D6FCFFC805BF2DF1F56EE7E31AC20F 120172~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in construction~|~05 - 4R Maintenance - Resurfacing~|~74D33A54FE83A542CD3828FD4B775A3F50B638D8 91551~|~1~|~1~|~01/BRO~|~Bridge rehabilitation project. Work includes pile encasement with substructure repair. HOC 595 0495, SFN 3704327. BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~C21F7988F33AAB312AA00523E09589D958AB812F 84542~|~1~|~1~|~01/STR~|~Resurfacing MOE 800 13.80-15.46, 17.92-26.04 and MOE 26 14.68-16.42. Federal 80%/State 20% STP Rural.~|~05 - 4R Maintenance - Resurfacing~|~BCA272E8B960934210D76B9044C257D2D369CEC9 105533~|~1~|~1~|~01/S<2~|~Urbanized Area Plan Split: DEL-315-8.61-8.65 & 8.66-8.68 FRA-665-3.52-6.31, 4.13-5.18 & 7.39-8.34~|~05 - 4R Maintenance - Resurfacing~|~B197259B08C04BBF1AF716B8471C570E212471B6 105533~|~1~|~2~|~02/IMS~|~Interstate Plan Split: FRA-270-0.00-0.60~|~05 - 4R Maintenance - Resurfacing~|~1A7E5BFE3AAAFEEE2C5C5E15DCA2E4F8104F7511 105533~|~1~|~3~|~03/NHS~|~General System NHS Plan Split: Various locations along FRA-3~|~05 - 4R Maintenance - Resurfacing~|~F38713522EFB7CDF0FD769F418A7E7229092884E 105533~|~1~|~4~|~04/STR~|~Rural Plan Split: FRA-655-5.18-7.39~|~05 - 4R Maintenance - Resurfacing~|~FD204F1C81106C940E60DD83C862624EBE7CB77A 105533~|~1~|~5~|~05/NHS~|~Priority System NHS Plan Split: DEL-23-16.10-20.84 FRA-33-22.33-24.27~|~05 - 4R Maintenance - Resurfacing~|~E07B676C9A6F14CE530A00355BDB75BB2F79CE85 105533~|~1~|~6~|~06/S>2~|~COC Urban Paving Plan Split: Various locations along FRA-3~|~05 - 4R Maintenance - Resurfacing~|~E99BFAFBF5030E4A3BBACB2590F032967E528531 98178~|~1~|~1~|~01/STR~|~STP Rural NON-BR Bridge Rehab 80/20 Fed/State PIC22-7.55 and 10.5 deck overlay~|~~|~8C04F4A8ACCDFCCA151F7DC1424794E05E7F44CC 98178~|~1~|~2~|~02/S<2~|~STP <200 Bridge Replace 80/20 Fed/State PIC-188-0.25~|~~|~941570C3795E2A7E204CC52568C53BB2B1F680AC 95383~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - District Preservation - Federal (80%)/State (20%) - No CAP - Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) Gue-SR 209-10.94-10.95(Location 9); 2) Gue-SR 209-11.27-11.29(Location 10); 3)Mus-US 22-7.95-7.96(Location 1); 4) LIC-40-4.57-4.59(Location 3);~|~21 - Safety~|~7980C7202F69C1D51ED707E89DA84267C8BBDAD1 95383~|~1~|~3~|~03/S<2~|~"03/S<2/OT/ " - District Preservation - Federal (80%)/State (20%) - No CAP - Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) KNO-229-9.71-9.72(Location 11); 2) LIC-13-6.48-6.49(Location 6); 3) MUS-22-14.68-14.69(Location 2);~|~21 - Safety~|~D2E92B95577A29112EA779A9CFC2A67C98EBD6D7 95383~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation - Federal (80%)/State (20%) - No CAP - Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) FAI-37-6.34-6.36(Location 8); 2) LIC-40-7.16-7.18(Location 4); 3) LIC-37-23.64-23.65(Location 7); 4) PER-13-39.33-39.35(Location 5);~|~21 - Safety~|~0A1A7A1EC71709ED27D6855092CB9BE163F36960 95383~|~1~|~4~|~04/NHS~|~District Preservation - Federal (80%)/State (20%) - No CAP - Smart Cities Infrastructure Upgrade to support the increased use of Intelligent vehicles: 1) Gue-SR 209-10.94-10.95(Location 9); 2) Gue-SR 209-11.27-11.29(Location 10);~|~21 - Safety~|~CBF005823E57C76EBC9B9FBEC26CC7EA975BD4D7 114618~|~1~|~1~|~01/S<2~|~Chipseal in JAC.~|~05 - 4R Maintenance - Resurfacing~|~B1BAFEA8BB484B284A130C0D67D6DE7EBB6407E9 114618~|~1~|~2~|~02/STR~|~Chipseal in JAC.~|~05 - 4R Maintenance - Resurfacing~|~B3E5EDCBD5898F763AE3E009F99CD0EEF12551ED 120474~|~1~|~1~|~01/NFP~|~Construction of improvements to US 68 and at the intersection of US 68 with Brush Row Road, associated with the feasibility study being performed under PID 115388.~|~04 - Reconstruction - No Added Capacity~|~07F1FA86F42B009E523BBAB7D0E9B0D17FDA6D02 77263~|~1~|~1~|~01/IMS~|~Widen IR-76 to six lanes from SR 21 to Barber Road in the City of Norton, Summit County, Ohio. ~|~~|~4979415BC24F40200BB34E6E330ACA2052C6DB22 119405~|~1~|~1~|~01/S>2~|~Resurface Trail and Enhancements ~|~28 - Facilities for Pedestrians & Bicycles~|~1E0139B6D1DD2F230285433DB699D00113B58909 116882~|~1~|~1~|~01/NHS~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~2E92932EFB0FE12597FA81BAAD6D339D42CCF3F4 100602~|~1~|~1~|~01/STR~|~Microsurfacing on CAR-43 from SLM 16.15 to SLM 22.32~|~05 - 4R Maintenance - Resurfacing~|~5875AC45D38823FEFE459E8AF62A0372BE3BF6A6 114772~|~1~|~1~|~01/NFP~|~Guardrail repairs and upgrades on various routes throughout District 4.~|~21 - Safety~|~36C9A7A182E30FB0CDFDA88287F555E3ED548351 87181~|~1~|~1~|~01/STR~|~Located 1.03 mile east of Dry Bone Road (CR8). 80% fed/20% state 6601200 PIK SR124 7.47 Intersect: Kincaid Creek01/STR/BR/State~|~10 - Bridge Replacement~|~74C9FDA26D97872ED11F1CFE4385C91909C7522F 119363~|~1~|~1~|~01/S>2~|~Reconstruction and roadway improvements~|~04 - Reconstruction - No Added Capacity~|~54DCD70361DC2FD35D9F0DC4A6136BF3ED16A30F 109437~|~1~|~1~|~01/MPO~|~Construction of sidewalk along Paddison Road from Beechmont Avenue to the existing walk at Bluecrest Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~63DFBDFC538317D72FFF43F283AD7D983E125B62 123431~|~1~|~1~|~01/STR~|~bridge plan split.~|~10 - Bridge Replacement~|~BE6E50921FF3AB157C3614842DB4000E9F28D6DB 87890~|~1~|~1~|~01/IMS~|~Remove existing bridges carrying IR 77 (TUS-77-2596 L & R, SFN 7903391, 7903421) and replace with embankment.~|~10 - Bridge Replacement~|~8520E60F43D1B53AAD33DCFF837EAA4C852B6118 116961~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~35AED36663AA49DF25094AF6BD447EA2F331CEB6 112502~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~7D4377CEB4A33E95A52C9CA55B4B39637321CABB 112502~|~1~|~2~|~02/NFA~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~09BC857E73A8860780D6E3AFF8C55E9404DB0B05 100983~|~1~|~1~|~01/STR~|~DSR# TUS-005~|~04 - Reconstruction - No Added Capacity~|~3B8722B3AC9969ACBC85C40358C5AB54E86DA7B7 115712~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - District Preservation Funds - 100% State (4PS7)~|~21 - Safety~|~D6012082355E9C8C3BE069570154BD875F10BBE5 95573~|~1~|~1~|~01/S>2/LORD~|~Resurfacing of Ellsworth-Bailey Road (CR-91) from the Mahoning County Line to Lyntz Road, in the Village of Lordstown, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~132EC66584C2861970B14F5BFF4D9B5A49E0D25A 95573~|~1~|~2~|~02/NFP/LORD~|~Pavement and Incidentals covered by Turnpike funds between SLM 0.97 and SLM 1.09 (300' North and South of Hallock Young Road Intersection) near the Ohio Turnpike, in the Village of Lordstown, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~C0AC9E53AF394D5E682DD5FEB92E01A23C4FFB4C 107014~|~1~|~1~|~01/NFA~|~Improvements to US 224~|~01 - New Construction~|~D9AB96417C831F7BA0D2DCBA1A403B80C3FEF573 115575~|~1~|~1~|~01/NHS~|~All work on the small bridges and four culverts in the project~|~04 - Reconstruction - No Added Capacity~|~4249946B06FFCE81EF5BAD47ECA42C796D171B22 115380~|~1~|~1~|~01/ENH~|~Safe Routes to School items~|~28 - Facilities for Pedestrians & Bicycles~|~F5FE22530BAF56813C5F39CF5C7801B0A583C280 93312~|~1~|~2~|~02/NFP~|~This split is for the extensive landscaping proposed by the LPA.~|~31 - Landscaping & Other Scenic Beautification~|~13E65798383435F542AD6C1B6C3D5F042B76EEB4 93312~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to construct a round about at LUC CR130 1.25-1.35 andLUC SR64 3.75-3.83~|~04 - Reconstruction - No Added Capacity~|~6F3451DAE799C147FAB8CF2D1986D641EF1DC7E5 113457~|~1~|~1~|~01/STR~|~Landslide repair from OH20-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7610723184AC6F2762A1F957FD7DDEC979B4C2E 108150~|~1~|~2~|~02/S>2~|~Columbus Urban Area: FRA-40-24.60-24.66~|~05 - 4R Maintenance - Resurfacing~|~19300AD2B28DF74879B986855B104B2DAE46541A 108150~|~1~|~3~|~03/S>2~|~100% City of Reynoldsburg plan split.~|~05 - 4R Maintenance - Resurfacing~|~18216E196DAC7E074B2E1D7E9A96927DF20232BB 108150~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-40-22.43-23.93, 24.25-24.60 & 24.66-25.19~|~05 - 4R Maintenance - Resurfacing~|~F1EB3176D93154CF48A6FD23EF4393E819C16CAF 108150~|~1~|~4~|~04/S>2~|~Work within the City of Columbus (FRA-40-22.43 to 22.45). No local share will be required.~|~05 - 4R Maintenance - Resurfacing~|~C611241BEA95EBBC640CEB17C71758BCA3FE7460 97688~|~1~|~2~|~02/NFA/MAD~|~100% Madison County funding for school flashers on Linson Rd, Price Hilliards Rd, and Killbury-Huber Rd~|~44 - Other~|~6427B15E876DDA22E66A26A922F52C45073BF42C 97688~|~1~|~1~|~01/STR~|~Replace school flashers at several locations~|~44 - Other~|~D5D48DF3AE3E61DBB075A1F9A64FD4F9E56C2B90 124588~|~1~|~1~|~01/SAE~|~Plan split for roundabout at US42 & Old 122/Middletown Rd (Part 1). ~|~21 - Safety~|~EF7F5130ADC2CF9D28B289D8847F917FAA3E9F84 124588~|~1~|~2~|~02/SAE~|~Plan split for Part 2 which covers PID 124820. Left turn lane at US42 & Township Line Rd. ~|~21 - Safety~|~16AC0193D34249744EDC3F2FD1D674574CDE52CD 122350~|~1~|~1~|~01/SAF~|~Install crosswalk, RRFB, and lighting~|~21 - Safety~|~DECA4C051E7E0EC883DA153B2FEB8238E1D0A2FB 102829~|~1~|~1~|~01/NHS~|~Micro surfacing of NHS route~|~05 - 4R Maintenance - Resurfacing~|~BAFF03CCE53CF6806C1E80FE50C3AD1E2160E791 102829~|~1~|~2~|~02/S>2~|~Microsurfacing US-40 (City of Columbus Urban Area Route)~|~05 - 4R Maintenance - Resurfacing~|~C29D6E0A823CBAF79ACEA1F49856C78A9E204A57 122648~|~1~|~1~|~01/MPO~|~Plan split for MPO STBG funded eligible resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~FAC38A06F23EA1F43085B39ADDE2E96BC10C9586 122648~|~1~|~2~|~02/NFP~|~Plan split for non-eligible bridge work at 100% local cost.~|~47 - Bridge Preventive Maintenance~|~02C69F82EF0DEEB7EFDDE38DF5EDCA2D768592A5 94145~|~1~|~3~|~03/S>2~|~STP Urban Resurfacing FRA-161-13.45 to 13.67100% state~|~05 - 4R Maintenance - Resurfacing~|~3B8FAC56D0DD55183B41823903D91011FBF0E6DF 94145~|~1~|~1~|~01/NHS~|~Paving of priority sytem portion of project. UNI-33-24.89-25.11; FRA-33-0.00-1.30. D6 Federal/State $~|~05 - 4R Maintenance - Resurfacing~|~A7DD397ABBA9F7F80315514F3C11CD3DB2243A66 94145~|~1~|~2~|~02/STR~|~Post Rd/161 and ramp resurfacing 100% stateFRA-161 13.31 to 13.45~|~05 - 4R Maintenance - Resurfacing~|~CA3D1EAFB24D71350AA28AE4B9EAB65DAC7209FF 113685~|~1~|~3~|~03/NFA~|~Van Tassel River Access Drive Micro~|~21 - Safety~|~3C5E76EC58C8214B8AA75F445BDB9285BA4FCB01 113685~|~1~|~1~|~01/SAF~|~Safety funded Micro for Interstate areas~|~21 - Safety~|~28D3432AAEF2B3A1DCFE7B3D709982FCAE01F849 113685~|~1~|~2~|~02/SAF~|~Paving split for Luc 184 0.0 to 0.04 -NB off-ramp at the US-23 Exit 234 (Alexis/Monroe) Interchange~|~21 - Safety~|~3E187D61753A57AB822F2E6EEA5A702B8B4C683E 105892~|~1~|~1~|~01/S>2~|~Split for urban paving funding for resurfacing~|~05 - 4R Maintenance - Resurfacing~|~0935AAF8831B4F909376FCCEF727C3F9A494D303 105892~|~1~|~2~|~02/NFP~|~Split for 100% local items of work.~|~05 - 4R Maintenance - Resurfacing~|~211FBA4C18DCCF0ADF8E6246BBADB0C0B0643564 120809~|~1~|~1~|~01/NFA~|~Raised pavement markings.~|~21 - Safety~|~F17CF6938F42B392B70D766640B34B100AB692BE 97856~|~1~|~1~|~01/MPO~|~Construct Veterans Trail from Barlow Road to Veterans Way in the City of Hudson.~|~28 - Facilities for Pedestrians & Bicycles~|~813A0DD23EC79D750C2E1836E1D62481C453E161 123679~|~1~|~1~|~01/S>2~|~Plan Split for large Urban locations~|~47 - Bridge Preventive Maintenance~|~F54F92B0E33AF5E62E5DCBF66CA7528D85414537 97995~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of SFN 2301350 listed above~|~13 - Bridge Rehabilitation~|~C4ECE72936B74E07EE062D7CADA663BFC7966EAC 107272~|~1~|~1~|~01/STR~|~Slide repair.~|~04 - Reconstruction - No Added Capacity~|~B936795F32796F094A3D4487C8A8C19EF5AA50BF 94335~|~1~|~1~|~01/ENH~|~test for Plan splits add/Nirmala Test~|~17 - Construction Engineering~|~299E56F3DD70AD3754B1A346C714D88EC4F0A3B9 94335~|~1~|~2~|~02/ENH~|~Test~|~~|~C084392A3E925380CDA5AA9B6B5F090AF4897555 116742~|~1~|~1~|~01/MPO/CUYF~|~Reconstruction.~|~04 - Reconstruction - No Added Capacity~|~1E2F5D43701591E0D5DC97D0552FFD4871FA8308 107289~|~1~|~1~|~01/S>2~|~Split for eligible urban paving work~|~05 - 4R Maintenance - Resurfacing~|~BD39A0D6F77F2C1494F6E88BD54FEF82D2C91902 107289~|~1~|~2~|~02/S>2~|~Plan split for work items at 100% local cost, non-eligible Urban Paving items.~|~05 - 4R Maintenance - Resurfacing~|~B89D8B5E08DF6B8CC8CF04BA2522229366B27A36 90835~|~1~|~1~|~01/MPO~|~Widening of sidewalks on both sides and narrowing the street width to match the existing typical section of Main Street at Greene Street. Also included is the installation of streetscape features such as brick pavers, decorative street lighting, benches and sign posts the entire length of the project.~|~44 - Other~|~C073986F59913E025DB684E52C43519623AFF305 93582~|~1~|~1~|~01/S<2/VIOL~|~"01/S<2/OT/VIOL" - Violet Township SRTS 4SC7 (100% Federal) - CAP $420,000.00 - SRTS side walk project on: 1) Fai-TR 221-00.54 to 00.71 Harmon Road; 2) Fai-TR 1480-00.00 to 00.56 Meadow Wood Drive; 3) Fai-TR 1474-00.00 to 00.14 Graden Street;~|~28 - Facilities for Pedestrians & Bicycles~|~1E5CCD2950F05409A3C744C9FFEC65AB3C33D4EC 118834~|~1~|~1~|~01/STR~|~Culvert replacement on PIK CR 57~|~04 - Reconstruction - No Added Capacity~|~40869BE626B0BAC1B078BB781ADA804874038A76 97428~|~1~|~1~|~01/SAE~|~Installation of new and upgrading of existing guardrail on various roads within Richland County.~|~21 - Safety~|~8DC34F8167A5C8C6CA5F2B2D809F20BA70A77F76 105896~|~1~|~1~|~01/ENH~|~Enhancement Work~|~31 - Landscaping & Other Scenic Beautification~|~C7FE173D62D91DE6C2B0E2413326359DA3329F0E 86745~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for all work using TRAC funds.~|~03 - Reconstruction - Added Capacity~|~DCD6A1F54216CD1D8132A4B6F9169C6507DE1B96 115087~|~1~|~1~|~01/NFA~|~Items of work for Ohio Exposition Center~|~44 - Other~|~1F305F7C46956AD17050F3041EFD2BA4622616B2 114973~|~1~|~1~|~01/STR~|~All work is in this plan split using district allocations from SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~225A87BE3C6B1F4DB227DD5D84A71EBC22073372 76289~|~1~|~1~|~01/NHS~|~ Reconstruct the interchange of IR275/SR32 to accommodate 20 year projected traffic. This will include work on SR32. Phase 1 construction+Eastgate structure and Phase 1&2 right of way.~|~04 - Reconstruction - No Added Capacity~|~4D89C4D8FD882BE3833C7BB6317E897F6E2D7F60 76289~|~2~|~2~|~02/S>2~|~Construction of four bridges needed to allow the Aicholtz Connector to pass under IR 275~|~04 - Reconstruction - No Added Capacity~|~B32653B3ADB43208B6A81189888F591AF647A495 114163~|~1~|~1~|~01/NHS~|~Split for pavement work on SR-44~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~81703744FDC27C56C28DAE1010F6DB756317710F 114163~|~1~|~2~|~02/SAF~|~Safety funding for construction work to install a turn slot and signal at Hosford Road. ~|~21 - Safety~|~C2ABCB31A87A6C541FEAE6F73AD980FF7AED93A4 114163~|~1~|~3~|~03/NFP~|~Split for 100% state TSMO funding to improve intersection geometry and improvements on Girdled Road~|~04 - Reconstruction - No Added Capacity~|~D90DB9BA0A39742A0CAE4974AAADBB2CE1B6ADF8 107799~|~2~|~3~|~03/IMS~|~DEL-71 Pavement Repairs and ramp resurfacing~|~05 - 4R Maintenance - Resurfacing~|~936A4C6EC359FC70B7342F08207D22CD963097D4 107799~|~1~|~1~|~01/IMS~|~Interstate Paving Split: FRA-71-25.61-27.74, FRA-270-24.55-26.50~|~05 - 4R Maintenance - Resurfacing~|~95361EE0910C621957F275169369A419FDA12CFC 107799~|~1~|~2~|~02/IMS~|~Interstate Bridge Split: SFN's 2511169, 2511320, 2511444 & 2511533~|~47 - Bridge Preventive Maintenance~|~1338FF184DA33E9BA5DE0CBB350C4975F85437CD 107799~|~1~|~4~|~04/SAF~|~Install Recessed Wet Reflective (R-WR) Pavement Markings~|~21 - Safety~|~840C89381274515A9EEF2A47A0AEF44F4F97BF37 107799~|~1~|~5~|~05/IMS~|~Provide smart arrow boards~|~21 - Safety~|~D147FDE78E0838895FFE2D254DD6E61FE9D2A4A0 107799~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~D79912BEEEB211766593329DCE85BE09A7C30DFC 87247~|~1~|~2~|~02/STR~|~ROS US50 5.01 - 11.27 Rehab bridgs:7103115 ROS US50 8.9 Intersect: California Hollow Run7103158 ROS US50 11.26 Intersect: CR149 (Jones Levee Rd)80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~104738C581EDCFB6CD7EB443D558A0BF6F022444 87247~|~1~|~1~|~01/STR~|~ROS US50 5.01 - 11.27On US50, beginning at the corp limit of Bainbridge (SLM 5.010) and heading east for 6.1 miles (SLM 11.26) terminating 0.85 miles east of CR149 (Jones Levee Road), it is proposed to resurface the highway with asphalt concrete.Brdg is pave thru.7103077 ROS US50 6.64 Intersect: Paint Creek80/20 Split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~9C896CFF5C4C898EDF273871AEE4A567AFC1998A 87247~|~1~|~3~|~03/SAF~|~Safety - Curve Improvem,entImprove the superelevation of the curve and install a high friction surface treatment with this resurfacing project to correct crashes. 90%fed/10%state~|~05 - 4R Maintenance - Resurfacing~|~E00B2C05181A70E79AD41D4A7162999A068C3451 96000~|~1~|~1~|~01/BRO~|~SFN 4802527 and 4802551~|~13 - Bridge Rehabilitation~|~1D864BAFE795015524963FE829C7ABC6BF0DAA24 96000~|~1~|~2~|~02/STR~|~from SLM 8.94 to 11.469~|~04 - Reconstruction - No Added Capacity~|~2E505268FABF873946D332BB37777D2454061030 96000~|~1~|~3~|~03/S>2~|~from SLM 11.469 to 12.41~|~04 - Reconstruction - No Added Capacity~|~4F3316EA56AC6C0B02D3D4FE6ECC014488EE0760 105893~|~1~|~1~|~01/S>2~|~Split for urban paving funding~|~05 - 4R Maintenance - Resurfacing~|~C2494B6A4E067AA782028796F06886DB690DA7CD 105893~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items not eligible for urban paving funds~|~05 - 4R Maintenance - Resurfacing~|~7A5BAF35136565C30FB92D52203A1957AABA9AF0 107459~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~C5D38434EA14915880A7B7DD6E9FD2D0CF8B18EE 107459~|~1~|~1~|~01/NHS~|~Resurfacing of SR 8 from 4.26 to 7.81.~|~~|~9C65D7737D38205ED22BA285988E10C2508E95B5 115126~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5BBD64418215054FC621CA19C73E116C614FA172 106374~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridges.~|~13 - Bridge Rehabilitation~|~C3406A1111E89DB8DD070A9219C35E3A4C6A63AE 106215~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 50 29.79, SFN 8200505. Rural other federal aid funded 80 federal/20 state.~|~~|~5028FF4CC2F83A1695F9E75AE133F042BBF82FEB 95003~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~44 - Other~|~5E40ECC2B2C7A834E37511599CBDB43EC5F9828B 107861~|~1~|~1~|~01/NHS~|~Slips on US 0030 Rural~|~44 - Other~|~8390E6FD7F04C12AC8F6F21B90CDFF251A8E8F2D 87660~|~1~|~2~|~02/CMQ/AQUA~|~Private waterline replacement.~|~43 - Utilities~|~DA620EBAB01657C601184D03ED7A4C5037A4487F 87660~|~1~|~3~|~03/CMQ~|~Widening for two new through lanes on STA SR 687.~|~03 - Reconstruction - Added Capacity~|~C1A66005D6652384B2C3901CBBD8528EA120C7BF 87660~|~1~|~1~|~01/CMQ~|~Resurfacing of of State Route 687 and Brunnerdale intersection in Jackson Township, Stark County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~AE6CC1D873B87E1099B5608C28FEB9F6AF889BFD 87660~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~03 - Reconstruction - Added Capacity~|~99FE940A1C3AACC04627C22636F436161A9996FB 82881~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 37 8.22-9.70 and MRG 78 0.00-16.83. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~70A42DC65D162690B61756821489BDD6E958B2F2 105022~|~1~|~1~|~01/NFA~|~Asphalt resurfacing of the ODOT District 11 Complex.~|~05 - 4R Maintenance - Resurfacing~|~D2178B61D9AE90B6BC9694EB3F4D46457E6981EA 100951~|~1~|~1~|~01/NHS~|~Fine graded polymer AC overlay to ATB US 20 from 0.00 to 2.00.~|~05 - 4R Maintenance - Resurfacing~|~FF407494E880AD03A6C3DB610D600CF1993EEC07 97105~|~1~|~1~|~01/IMS~|~Seal bridge decks and wearing sufaces using a flexible epoxy overlay on SFNs 5706513 and 5706483.~|~13 - Bridge Rehabilitation~|~6AFB5A4A4D23C5B0DA6C515D70836A5BF9C956EF 101147~|~1~|~1~|~01/NHS~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide.~|~44 - Other~|~F41821194CF58049BAF1F0C217DDCD9A50CC81BB 109931~|~1~|~1~|~01/S<2~|~"01/S<2/PV/NWRK" - rehabilitation of Thornwood Drive between River Road and Faye Drive.~|~04 - Reconstruction - No Added Capacity~|~2204984356C55AA7BD9A9D375A444DAD42F7E4F3 126646~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 148 over Captina Creek.~|~13 - Bridge Rehabilitation~|~389014EAF66F25E1E5BA8721E7515B1427DED837 109600~|~1~|~1~|~01/NHS~|~Intersection Improvement at LAW 52 20.45 and Walmart Way.~|~21 - Safety~|~C5EBC88A2FD5CF6FE88F3908DE7DA5D59D95C9C6 126365~|~1~|~1~|~01/NFA~|~Install & upgrade guardrail~|~21 - Safety~|~0E9CC2C73489B26BCC5D013D92F17861FEF2DC06 102210~|~1~|~1~|~01/S<2~|~LAW CR 31 0.36 ER Slide Repair~|~~|~06C4E8F561D5F94301B2244E20285A5FBDFF38F9 110315~|~1~|~1~|~01/MPO~|~Federally eligible~|~28 - Facilities for Pedestrians & Bicycles~|~763357404D97F81E22B1938BDCBB422D3E28FCA6 102485~|~1~|~1~|~01/NHS~|~Microsurfacing of HAS-250~|~05 - 4R Maintenance - Resurfacing~|~66920FBFD48BBC1AF2B1546035E4833C19B54FC1 122116~|~1~|~1~|~01/STR~|~All bridge replacement work included in this split.~|~10 - Bridge Replacement~|~967ADAFFCB3B225F58B2ED9D1E71165C419B264E 113841~|~1~|~1~|~01/IMS~|~Slope stabilization along Ramp C at the Wards Corner interchange on CLE-275~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1274E889FDE7C4B4FF12476E320BA3CF1B4A2BBF 83002~|~1~|~1~|~01/SAF/ZANE~|~"01/SAF/PV/ZANE" - Safety Funding - CAP of $1,404,589.96 Safety Program (4HJ7 Funding) and a CAP of $292,088.46 Large City Funds (4TA7/ZA05) using 4BC7 to match both -Realignment of Dresden Road (MUS CR 2) with MUS SR 60 at the 18.35-18.5 and the Bethesda Drive onto MUS SR 60 at the 19.42-19.64. Local participation in match and overages required~|~21 - Safety~|~2F928338918A0084580833F122B05D367C42F830 112900~|~1~|~1~|~01/NFA~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~C58893BB500BDA3DB4A136CEA58CB9F8BDB8DDBC 102905~|~1~|~1~|~01/S<2~|~Urban Area Pavement - All of Ott-53.~|~05 - 4R Maintenance - Resurfacing~|~C77CE0AAE9948E40A88E5CFA128FBDE37669F588 108823~|~1~|~1~|~01/NHS~|~Tree Removal.~|~44 - Other~|~24E45F78BD4BE65EFC3000F24025236B19AF3B5B 89063~|~1~|~1~|~01/BRF~|~80/20 funding split for bridge work eligible for federal local bridge funds.~|~10 - Bridge Replacement~|~E8CC69AD319964D204D13A1714BA9153F5F2D813 76465~|~2~|~5~|~05/IMS~|~Pavement marking and RPM's for Part 2~|~05 - 4R Maintenance - Resurfacing~|~2563B9D426CDF9697627C4B77F5E5C097E12AEBE 76465~|~1~|~3~|~03/IMS~|~Pavement Markings / RPMs~|~05 - 4R Maintenance - Resurfacing~|~3E6730C006B0E9A7C25FE5E7E8EA9BC04D7099AC 76465~|~1~|~1~|~01/IMS~|~Fed/state minor rehab pvmt workFRA-670: 0.00-3.8801/IMS/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~638DD9B3C5C531ED8DF0B341E1AC9BDA0F637E31 76465~|~2~|~4~|~04/IMS~|~Microsurfacing FAY/MAD IR 71~|~05 - 4R Maintenance - Resurfacing~|~9310B0577094B8AD742DFCA5E335661A4B204A33 76465~|~1~|~2~|~02/IMS~|~Fed/state minor work (sealing/cleaning) on 17 bridges2504340 FRA IR670 0.17 Intersect: Over I-6702504367 FRA IR670 0.21 Intersect: Over Mckinley Avenue2504375 FRA US33 0.31 Intersect: Over Scioto R, Us33, Rr2505746 FRA IR670 1.05 Intersect: 670 Ramp C Over Scioto R2505762 FRA IR670 1.08 Intersect: 670 M.L.Over Scioto River2505770 FRA IR670 1.09 Intersect: 670 Ramp B Over Scioto R2505789 FRA IR670 1.49 Intersect: 670 Over Scioto Overflow2505843 FRA IR670 2.07 Intersect: 670 Ramp Sc Over Scioto R2505819 FRA IR670 2.13 Intersect: Over Us33 & Scioto R.2505878 FRA IR670 2.17 Intersect: 670 Ramp Se Over Scioto R2505924 FRA IR670 2.36 Intersect: 315 / Olentangy R2517574 FRA IR670 2.65 Intersect: CSX RR2517590 FRA IR670 2.81A Intersect: Ramp ND / Goodale2517647 FRA IR670 2.82 Intersect: Goodale Conn.2517612 FRA IR670 2.83B Intersect: Ramp NC Goodale Conn.2517639 FRA IR670 3.14 Intersect: Neil Ave2506246 FRA IR670 3.81B Intersect: 670E over 232517795 FRA IR670 3.87A Intersect: Ramp over Service Rd02/IMS/BR/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D04489BCC91D16DDFE1D21EF355E03C1560B8751 109871~|~1~|~1~|~01/NFP~|~D09 Auxiliary Markings (A) FY2025~|~21 - Safety~|~7C9738AC57F76F64AE3B45AF286394BFC730DD48 105129~|~1~|~1~|~01/NHS~|~Bridge painting project. WAS 7 24.27 (SFN 8402167), WAS 7 37.62 (SFN 8402477), WAS 50 4.89 L (SFN 8401381) and WAS 50 4.89 R (SFN 8401411). NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~011682EC0B2F37780AADBF5AD39A4BC2C35684D1 101367~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 160 16.05, SFN 8201684. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~132A988F76F48EC06EE32050F4809BD9705C29A4 88278~|~1~|~1~|~01/ENH~|~ROS Frankfort SRTS Phase 2 - Safe Routes to SchoolWithin the Village of Frankfort it is proposed to do Phase 2 of their SRTS project which includes the following:High Street: Sidewalks from Anderson Ave. east to Temple StreetPorter Ave.: Sidewalks from Brown St. north to High St.Main Street: Sidewalks from High St. north to Eastern Ave. 100% Fed 01/ENH/OT/Frankfort~|~28 - Facilities for Pedestrians & Bicycles~|~2F26770D0B3F6F0068FFB0EAACC1CC8BB644C94D 98747~|~1~|~1~|~01/BRF~|~SFN 8736278~|~10 - Bridge Replacement~|~51A81B9666F97B58DC6F19AC025C5B6B7B333D9C 99668~|~1~|~1~|~01/NFP~|~Construction of North Baltimore Outpost~|~01 - New Construction~|~EB14720507673B567C52D48016620F568FC17CE9 113308~|~1~|~1~|~01/MPO~|~work eligible for federal-aide.~|~05 - 4R Maintenance - Resurfacing~|~70B7EA98A12A1D11B104FA5ECDCE016321536592 77876~|~1~|~4~|~04/NHS~|~SFN 7709315 SUM-241-11.72~|~13 - Bridge Rehabilitation~|~62E614C27E36C995776519196794175E7E759A0E 77876~|~1~|~1~|~01/IMS~|~Concrete pavement restoration of SUM-IR76, from SLM 11.80 (Inman Street) to SLM 17.98 (Portage County Line), in the City of Akron and Tallmadge, Summit County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D38BAC34F7CE8C31178695BB5A1A38686B616311 77876~|~1~|~2~|~02/BRO~|~See linked bridges.~|~13 - Bridge Rehabilitation~|~4012F1783D491A58EF030D561FFBAC3E164B23FB 77876~|~1~|~3~|~03/IMS~|~See linked bridges.~|~13 - Bridge Rehabilitation~|~6DF17940DC6DB57D783167DC17ABF09FDBC379E0 82462~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete in Sidney on SR 47 from Kuther Road (SLM 12.69) to VanDemark Road (SLM 13.71).~|~05 - 4R Maintenance - Resurfacing~|~70B5FA2DD4CA687A45B153124BB724AD4EFF7AC3 112735~|~1~|~2~|~02/MPO/BARB~|~Resurfacing of Norton Ave in the City of Barberton.~|~05 - 4R Maintenance - Resurfacing~|~4B62DAA46D666F25019283324F956A4E405A4080 112735~|~1~|~1~|~01/MPO/BARB~|~Resurfacing of Snyder Ave and Hopocan Ave in the City of Barberton.~|~05 - 4R Maintenance - Resurfacing~|~3BBCE00681596B2E31F6048901BD243AC18D8575 79550~|~1~|~2~|~02/BRO~|~Replace one deteriorated structure with minimal approach work, three span, length 82', Level 1 Design in Ansonia at 0.40 Miles North of Junction SR 47 and SR 118 over the North Fork of Stillwater River.SFN 1901621 DAR SR 118 0849~|~10 - Bridge Replacement~|~00838D5D9784FADD29598CC1FD8A227F3E0EBF4C 79550~|~1~|~1~|~01/STR~|~Pipe removal and copper service branc requested by the village in ansonia.~|~44 - Other~|~05A1519E941BC696E29BDDD3F3B693715E13C9B4 102368~|~1~|~1~|~01/STR~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~7FE9A4E859F99D71FF7033461494FA6D6E62D597 121837~|~1~|~1~|~01/NFA~|~installation of EV charging station in City of Trenton~|~63 - Electric Vehicles & Charging Infrastructure~|~3BF68C5D19505406AE636F4CA0FCE40C68E32329 124497~|~1~|~1~|~01/SAF~|~Plan split for all work on FUL-66~|~21 - Safety~|~59C5549CA6930B93AA0F132F8A703E41C3EDF0A4 88776~|~1~|~1~|~01/ENH~|~West Main Street (Bus-35/US-42), from S. Church St. to S. King St. Project includes addition of ornamental street lighting, curb and sidewalk replacement, pedestrian crossings, ADA curb ramps, banners, street trees, tree grates, benches, trash recepticles, bike racks, and wayfinding signs in Xenia.~|~21 - Safety~|~DFE7B30F751F9A9495D3FBE9860CC73C986DAA80 121442~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD.~|~04 - Reconstruction - No Added Capacity~|~92348BCE59F7777BD3902F3E9806C3F0B1B21554 111377~|~1~|~1~|~01/NFP~|~SUM TID - New Park Drive reconstruction.~|~04 - Reconstruction - No Added Capacity~|~30B4201B924FF5CC3AB53B0A1BEDEE65C88AD259 112737~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to MRW-19-6.43 andMRW-288-0.7~|~~|~58627E8CC9D393445A6CAEDAF8EEDFC83D303DD4 112737~|~1~|~2~|~02/BRO~|~Bridge replacement~|~13 - Bridge Rehabilitation~|~852DAC30563B18BEBDBEA25216A85F1605870C13 98634~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate route.~|~13 - Bridge Rehabilitation~|~FBBDEA36AFB69D3E8C8BBC8A0E0D8FA6F3E432F7 107504~|~1~|~1~|~01/NHS~|~Concrete pavement repairs on JEF-22~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9D213933F6337729B6DE5DC3A95E7D7EBC2503FA 85334~|~1~|~1~|~01/ENH~|~"01/ENH/BR/MTVE" - Enhancement Funding 4B37(80% Federal) / 4BG7(20% Local) - CAP of $1,540,600.00 for 80% Federal Share - Enhancement project to construct a bridge and connecting bike trail in Mt Vernon connecting to the Kokosing River Parkway Bike Trail~|~28 - Facilities for Pedestrians & Bicycles~|~A533B66AAE3D364F00379A301C7671A642369335 94104~|~1~|~1~|~01/ENH~|~Test Project to add funding split and verify the report~|~~|~20D14AC77739AFC0D76720AF34DF8F070C03BE53 101501~|~1~|~1~|~01/STR~|~DSR# BEL-020~|~04 - Reconstruction - No Added Capacity~|~72FFEC9CFD27DC5C2C0BA91870AD372F163EE933 76352~|~1~|~1~|~01/IMS~|~Minor pavement rehabFRA-270 SLM 40.45-43.4501/IMS/PV/~|~05 - 4R Maintenance - Resurfacing~|~67A434BC8916DFE7526380FE4DFCFF96FF190058 76352~|~1~|~2~|~02/IMS~|~Minor bridge work - not BR eligible2512106 FRA IR270 41.87 Intersect: Livingston Run2512114 FRA IR270 42.15 Intersect: Livingston Ave2514524 FRA IR270 43.18 Intersect: Rt Cd Road Over NS RR2514559 FRA IR270 43.18 Intersect: Over NS RR2514613 FRA IR270 43.01 Intersect: Lt CD Road Over Ramp2514648 FRA IR270 43.01 Intersect: Rt CD Road Over Ramp2514702 FRA IR270 43.01 Intersect: Over Ramp 70EB To 270NB2514710 FRA IR270 43.01 Intersect: Over Ramp 70EB To 270NB2514737 FRA IR70 42.82 Intersect: Rt CD Road Over IR 702514761 FRA IR70 42.82 Intersect: Lt CD Road Over IR 702514796 FRA IR70 42.82 Intersect: Over I-702514826 FRA IR70 42.82 Intersect: Over I-7002/IMS/BR/~|~13 - Bridge Rehabilitation~|~CA615CEC4CD3FB31C454FAC26C6255F056E35A07 113002~|~1~|~1~|~01/STR~|~Plan split for work on the CLE-222 culvert~|~04 - Reconstruction - No Added Capacity~|~23B3062CA2A59F6F5F233F9330969D22FFD0C5D6 113002~|~1~|~2~|~02/S>2~|~Plan split for work on the CLE-132 culvert ~|~04 - Reconstruction - No Added Capacity~|~1AD10942E30A467C5F34A07AB15045D63D086572 121921~|~1~|~1~|~01/ENH~|~Install a multiuse path along Johnson Road to connect the Hock-Hocking Adena Bike Path to State Route 682. Work includes drainage improvements, pedestrian lighting, crosswalks, pavement marking and signs.~|~28 - Facilities for Pedestrians & Bicycles~|~61EB8D903F72D80522340C07C26B61EEC42448CE 104370~|~1~|~1~|~01/IMS~|~Plan split for pavement work~|~05 - 4R Maintenance - Resurfacing~|~4DBD3819BF3A3137507AEC05C75F45C02E628613 98319~|~1~|~1~|~01/NHS~|~JAC SR 93 17.58-24.46~|~05 - 4R Maintenance - Resurfacing~|~778CCB82D0C655C643E0E68AACBE69FE68880445 98319~|~1~|~2~|~02/NHS~|~JAC 32 20.21 (4003756 & 4003780)~|~47 - Bridge Preventive Maintenance~|~76FD58507D1E93AA09049385CC3A99C1EB8AA319 123739~|~1~|~1~|~01/STR~|~Plan Split for resurfacing STP Rural~|~05 - 4R Maintenance - Resurfacing~|~F08C3562D5D167F65D3ABE94520CC489157C7436 114809~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~417757AE885BEE0DE0EFE983B7A4C582269E03E3 107662~|~1~|~1~|~01/S<2~|~Concrete repairs for COL-14 and COL-344 in the City of Salem~|~05 - 4R Maintenance - Resurfacing~|~23B9EC6DDBC2E00F49C667CB693366E199AC1F5A 107662~|~1~|~2~|~02/S<2~|~Work requiring 100% city funds, including auxiliary pavement markings and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~519C5E5A4F8B075AAEB534D43B27D63B1EA1D481 79563~|~1~|~1~|~01/BRO~|~Bridge replacement project. MEG 124 0125 (SFN 5300967). BR Eligible. Funded 80 federal/20 state.~|~10 - Bridge Replacement~|~94644ED7EC6563C89DD20624B103E7F1BA0B54FB 117850~|~1~|~1~|~01/MPO~|~Plan Split for TMACOG (MPO) STBG Funds (4TA7)~|~04 - Reconstruction - No Added Capacity~|~811EB73BDC3B732E7684AE6D6076C8E80ACA5DA0 117850~|~1~|~2~|~02/MPO~|~STBG funded Plan Split for sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~FDF141749F322764DEC0A09B2D977F010CC55BA3 117850~|~1~|~3~|~03/NFP~|~Plan Split for 100% locally funded scope, such as replacement of 42" drainage pipe.~|~~|~3764D1BF1816AD9D600D07F824938B6C45BFF9DA 85269~|~1~|~3~|~03/NHS~|~SFN 8600910~|~13 - Bridge Rehabilitation~|~14A52060D379C8B0F4C2513664AAECE13567E984 85269~|~1~|~2~|~02/S<2~|~On WIL 2 from SLM 0.00 to 1.27~|~05 - 4R Maintenance - Resurfacing~|~2DF72998180235BEA5C073AFB25214788C88D78A 85269~|~1~|~1~|~01/NHS~|~Resurface WIL US20A 1.1-4.77 and WIL-15 from 8.01 to 15.02~|~05 - 4R Maintenance - Resurfacing~|~C0CB22A9CBCC4FF6E0763E7F35935078897A2A85 116386~|~1~|~1~|~01/NHS~|~COL-30~|~05 - 4R Maintenance - Resurfacing~|~F7C228D9594A47A6E312BC5E9DE26E8D8A107496 108329~|~1~|~1~|~01/STR~|~Landslide repair project. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D02CEDACA9F8FBBD5A87C4407BC05BEF45B5349 126354~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~C8B9C9CFC640DB5CFDBAAFF846E6DB60FC22F2D8 121725~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs MED-421-0.00 to 3.436 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~8B83B5A65CE85FDEC6EB6128EDB794D907603A8D 96526~|~1~|~1~|~01/S>2~|~Generic Plan split. This is a Block project.~|~05 - 4R Maintenance - Resurfacing~|~1248FCD86179CE560F6CD1A23AEA8C76A5C626AA 127019~|~1~|~1~|~01/ENH~|~Construct an 11 ft wide multi-use path along the east side of US 250~|~28 - Facilities for Pedestrians & Bicycles~|~804884E48F4E8E71B39408AB4A5E3E167960C4F8 127019~|~1~|~2~|~02/ENH~|~Construct an 11 ft multi use path and some sidewalk connections on the east side of US 250 in the City of Norwalk.~|~28 - Facilities for Pedestrians & Bicycles~|~9C5F1C834326FA03570B91937DD60A215663F4BC 125042~|~1~|~1~|~01/NHS~|~Rehabilitate bridge carrying US 250 Eastbound over IR 77, Ramp E and Stonecreek.~|~10 - Bridge Replacement~|~11207E2B15E17786AEC8F38A4FEAECCE699449AC 91509~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH US 33 12.72 LT and RT (SFN's 0500844 and 0500879), HOC US 33 8.30 (SFN 3700429), and ATH 682 0.04 (SFN 0500925). NHS, 80% Federal and 20% State.~|~44 - Other~|~F6BD442F0F33EC1E8D726F50FA8BAA092F20799B 91509~|~1~|~2~|~02/S<2~|~Bridge painting project. HOC 328 11.33 (SFN 3703878). Urban other federal aid funded 80 federal/20 state.~|~44 - Other~|~625A63C7406614DFAA7727BADDB89E232D799471 114299~|~1~|~1~|~01/IMS~|~Tree clearing~|~44 - Other~|~DE0F81D09C940BC7CA89F2100993BB8955A439D0 101946~|~1~|~1~|~01/NHS~|~Replacing linked structure.~|~~|~9568FE5929E473E4620812D4CF9B3EF7F6588A53 124379~|~1~|~1~|~01/NFP~|~Plan Split 1~|~17 - Construction Engineering~|~395845F3587F75586F7E97806C5028A2BC6A3708 114368~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ "~|~05 - 4R Maintenance - Resurfacing~|~C6D78E54AC93FF4C5A7683B3425C813EC26F990F 114368~|~1~|~2~|~02/S5K~|~Plan Split 02/S5K/PV/ for Mus-146-16.05 to 17.545~|~05 - 4R Maintenance - Resurfacing~|~BB6374CB58A61292A136573932A06CE61C91119F 85217~|~1~|~1~|~01/STR~|~Funding split for all pavement work~|~05 - 4R Maintenance - Resurfacing~|~A661716D1FD491920E650E4A7F3BBAF74393CE12 108759~|~1~|~1~|~01/NFP/ODNR~|~ODNR Pavement Funding - 4BF7 (100% State) - No CAP - Resurfacing of routes R-1, R-3, R-8, R-18, R-31, R-32 and Lodge Parking Lots.~|~05 - 4R Maintenance - Resurfacing~|~817F3E4767E0D87B4FD3AFB5A556035948F2FB98 123735~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~E6D904D3648365730611FC755CBB3B345434D360 111635~|~1~|~1~|~01/IMS~|~Concrete deck overlay project. NOB 77 4.75 L (SFN 6100392) and R (SFN 6100422). Interstate route funded 90 Federal/10 State.~|~13 - Bridge Rehabilitation~|~ECB196DC2342988AB11F30E31D7A7101ACF857FE 105378~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route: MIA SR 48 SLM 5.70 to 8.74~|~05 - 4R Maintenance - Resurfacing~|~73DD6CDDF0B4DD6579E15011ED3C01C1D670ADC0 85112~|~1~|~4~|~04/ENH/BRID~|~"03/ENH/OT/Brid" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/local project share for enhancements in Bridgeport.~|~28 - Facilities for Pedestrians & Bicycles~|~1604B2629C72BE976151B7D23EF68D318EA42534 85112~|~1~|~1~|~01/S<2~|~"01/S<2/PV" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/state D-11 project share.~|~05 - 4R Maintenance - Resurfacing~|~4719669E122E81BBD56782A3D259044244EE54AA 85112~|~1~|~3~|~03/ENH/BROO~|~"03/ENH/OT/Broo" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/local project share for enhancements in Brookside.~|~28 - Facilities for Pedestrians & Bicycles~|~C0144DC4F3C144AC1C078F46466A98DC5959C972 85112~|~1~|~2~|~02/ENH~|~"02/ENH/OT" - On US 40 from CR 10 to the west corp of Bridgeport. Mill & fill inlcudes sidewalk, curb, curb ramps, minimal drainage, etc. This plan slpit for the 80/20 fed/state Enhancement/D-11 project share of enhancement work (4B37/4PS7); up to the federal 4B37 cap of $947,900 less the 4B37 funds used on Split 3 and 4 in Brookside and Bridgeport, respctively.~|~28 - Facilities for Pedestrians & Bicycles~|~CF520095436E3067A7AD889071D5AABD11910614 115993~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B77DF9D39B5821CEFE51E56C9752D3D3B3C91A7D 85934~|~2~|~2~|~02/MPO/San~|~Revised Plan Split 2 for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~3AF36825D7B1B677231649398617B60A9A0B743D 85934~|~1~|~1~|~01/MPO~|~Mill and fill~|~05 - 4R Maintenance - Resurfacing~|~C32A6C84BB2F87162BE9DF8DA94F48F26826B72D 116739~|~1~|~1~|~01/NHS~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~19F11484AE4E23CAB5010EAB46EF194389096D0D 94430~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~1F6F010470FBD34B31ED3ACE3D9BA70D1E076659 104923~|~1~|~1~|~01/NFA~|~Dayton Freight truck replacement project~|~44 - Other~|~A78837101FFB675A8240772C8D1C6FD37F8BF651 101047~|~1~|~1~|~01/NHS~|~SUM SR 8 from 13.31 to 14.99.~|~~|~FF883C11E0CB8731729CAEAACAD9A7C522787E83 101047~|~1~|~2~|~02/S>2~|~SUM SR 303 from 8.94 to 10.54SUM SR 619 from 3.00 to 3.85~|~~|~0CBBE3CEBB740ABC4EC77E8854236F6F5059572E 101047~|~1~|~3~|~03/STR~|~SUM SR 303 from 5.49 to 8.94~|~~|~87CDB3B1B193CA303023B026B7C9C1496DD96C04 98381~|~1~|~3~|~03/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~DD3E11FD8660073D4BDF82B9855D89FE5D95656B 98381~|~1~|~2~|~02/NHS/KENT~|~Resurfacing POR SR 261 0.72 to 2.59 in the City of Kent.~|~05 - 4R Maintenance - Resurfacing~|~72F2100FC117DE2A776243F3BB800B276ADC1747 98381~|~1~|~1~|~01/NHS~|~Resurfacing POR SR 261 from 0.00 to 0.72 and 2.59 to 3.51.~|~05 - 4R Maintenance - Resurfacing~|~5B2EDFF90188B2C2B0A00442C444648ACD6C705A 122102~|~1~|~1~|~01/NHS~|~Plan split for repairing retaining wall~|~04 - Reconstruction - No Added Capacity~|~0BEA7A024C7367FB030B72957A8E07BC7B897581 122946~|~1~|~1~|~01/S50/HEAT~|~Thornwood Dr from Lees Dr to Ridgely Tract Dr in Licking County.~|~04 - Reconstruction - No Added Capacity~|~67A2D6007017B4CD8A30FB6728E62264B8465CC6 93097~|~1~|~2~|~02/STR~|~HUR-601-0.00 to 1.96~|~05 - 4R Maintenance - Resurfacing~|~42B34315B24F04E75C7975D865681D8FB279D6F6 93097~|~1~|~3~|~03/S<2~|~HUR-601-1.96 to 4.36~|~05 - 4R Maintenance - Resurfacing~|~3813531EE63EB91DAE3C0D9E1A2B1B81AFAACDFC 93097~|~1~|~1~|~01/NHS~|~Gap Project - Reactive Spot Paving/Repairs for HUR-20-10.76 to 16.36~|~05 - 4R Maintenance - Resurfacing~|~6A7A7842541FAACE6DA56D67DC15363AC5A0251A 101023~|~1~|~2~|~02/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Full Depth Repairs and Spot Paving on NOFAS-Rural routes in District 5, PER-555-0.81 to 3.73~|~05 - 4R Maintenance - Resurfacing~|~0E99B1D7BEE829E50781511F58A886B6D0710ABB 101023~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5, COS-83-19.42 to 26.68, COS-93-15.40 to 20.60, PER-13-20.15 to 25.87, PER-555-3.80 to 4.20, GUE-313-14.94 to 14.98~|~05 - 4R Maintenance - Resurfacing~|~3F9543179E5575127A249450961072AFC93996E7 101023~|~1~|~3~|~03/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Full Depth Repairs and Spot Paving on IMS routes in District 5, BEL-70-0.00 to 0.04, GUE-70-28.17 to 28.48, LIC-70-9.58 to 15.07.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF7C406620AF27907BEED81FB7FCEF3009830CF5 116052~|~1~|~1~|~01/NFP~|~Plan split for bridge electrical maintenance~|~40 - Special Bridge~|~A7410610BE8B752B21764A663473336AEA69463D 97949~|~1~|~1~|~01/NHS~|~Overlay SR 48 & SR 49 in Montgomery County:MOT SR 48 SLM 16.14 to 17.85MOT SR 49 SLM 12.12 to 15.96~|~05 - 4R Maintenance - Resurfacing~|~D582E3A113AAE79698C25A24E01B449E02A4D0E7 104248~|~1~|~1~|~01/NFA~|~The Village will improve, widen and extend Eric Wolber Ave starting just south of the industrial Lane intersections. The length of the project approx. 1,600 feet.~|~01 - New Construction~|~BEDCF1187045134C251433ECAAB624B3F3496B39 119554~|~1~|~1~|~01/S>2~|~Bicycle and Pedestrian improvements~|~28 - Facilities for Pedestrians & Bicycles~|~5AE52BCA7F0AEFA81BBCF5074D6E9FC7DD7F809D 125947~|~1~|~1~|~01/NFP~|~Plan split for traffic signal work at various district locations~|~21 - Safety~|~7F3975AE2970968FDF366988CF71AF0DFA6D84E4 119642~|~1~|~1~|~01/IMS~|~Split for ramp work~|~04 - Reconstruction - No Added Capacity~|~B3A7F08D46E45CD742DF14147020657B6C5F6C05 119642~|~1~|~2~|~02/IMS~|~SPR funded work - wrong way bump pad~|~~|~9696F3729D811B17AB0B323241ADB2B7225FAE15 114689~|~1~|~1~|~01/SAE~|~Implementation of distracted driving corridor~|~01 - New Construction~|~0C998ECE465F941A01E95EA7A816319869D1C744 102231~|~1~|~1~|~01/NFA~|~Replacement of Water Street Bridge over Cowles Creek in the City of Geneva, Ashtabula County, Ohio.~|~10 - Bridge Replacement~|~23F0A72235F2F0D9F3BEB8995051313847CC732C 102231~|~1~|~2~|~02/NFA/GENE~|~Reconstruction of North Cedar Street in the City of Geneva, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~E8583C6F816D296EDC4DE468C6088F6111EDC643 85188~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. 1806602~|~10 - Bridge Replacement~|~2A5785927711560DEDD23A648707F23A756B764C 100116~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~60DF9DFE4B417CB88F70EC097F31BFF9CBAD4428 94673~|~1~|~1~|~01/S<2~|~Replace concrete beam bridge due to deterioration. SFN 4602137 LOG 235 2200 over Black Hawk Run.~|~10 - Bridge Replacement~|~F4E850F2C907F8FFD6D654FC6BC8CEE117825524 111579~|~1~|~1~|~01/MPO~|~Federally eligible items.~|~04 - Reconstruction - No Added Capacity~|~F2142B3FC66D531ED8F0EFB9002D1990FE8266C3 114222~|~1~|~2~|~02/STR~|~Chip sealing.~|~05 - 4R Maintenance - Resurfacing~|~20E3E215F3D975685E8D0BA25BFC6E0CA27850BE 114222~|~1~|~1~|~01/S5K~|~Chip sealing.~|~05 - 4R Maintenance - Resurfacing~|~0E90F7A9BE0EE20D3EF054B38A4A86A4F8ABE246 111348~|~1~|~1~|~01/NFP~|~ODNR project for gravel road resurfacing in Jesse Owens State Park. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~CC91E460A5A50FABD132861C08CA403C7115E4A7 104715~|~1~|~1~|~01/IMS~|~Austin Road interchange Phase 2 enhancement project - landscaping at the interchanges on-fields and off-fields~|~31 - Landscaping & Other Scenic Beautification~|~5C869F26A461F1FB004B8B8EDDE9A82B9765DDD6 119211~|~1~|~1~|~01/NHS~|~Columbus Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~FA36D75CEEB250355646C0E96380E853855F2716 105034~|~1~|~1~|~01/MPO~|~80/20 split with ERCP~|~28 - Facilities for Pedestrians & Bicycles~|~94AFE694D358ECFA7A6EAA56FC1E002160DB7D3C 114603~|~1~|~1~|~01/MPO~|~This plan split includes all work associated with constructing the shared use path along Irwin Simpson from Mason Montgomery to Duke Blvd.~|~28 - Facilities for Pedestrians & Bicycles~|~F4BACB9713461568609ECBEFA5EA9F99544B70BD 126950~|~1~|~1~|~01/S>2~|~Redeck bridge.~|~13 - Bridge Rehabilitation~|~4AD3AF3C12F37E804092409CF058625784D271F4 117233~|~1~|~1~|~01/CMQ~|~Primary plan split for CMAQ eligible scope.~|~21 - Safety~|~541BA3667A53ECAA91C71EB17571CD2027C7F8DC 120111~|~1~|~1~|~01/S5K~|~All roundabout (safety) work included in this split. ~|~21 - Safety~|~088F4148C7FFCCC75C0868559DE06689A46CD582 120111~|~2~|~2~|~02/BRO~|~All bridge work included in this split. Replace deck, abutments, and paint the structure over Chicago, Ft. Wayne & Eastern Railroad. Make various drainage improvements north and south of the bridge limits such as catch basin, curb, and conduit replacements. (Part 2)~|~13 - Bridge Rehabilitation~|~DE3DB03254FDE42C46B730B5A307BC8F142F5D46 120111~|~3~|~3~|~03/NHS~|~All RCUT related work at US 30 and John Brown Road. Part 3~|~21 - Safety~|~250117E72D90E0D1C099A298EFDC2EBE60ECAE14 113957~|~1~|~1~|~01/MPO~|~Resurfacing related items.~|~05 - 4R Maintenance - Resurfacing~|~74B3166F53F7F9149F64DFFFDB7DFC5F1E9AB080 104286~|~1~|~1~|~01/NHS~|~Pruning, Tree/Bush Removal~|~44 - Other~|~0515E5A7A5886754D76C0FA431911A36703FE645 98774~|~1~|~1~|~01/NFA~|~Replace SFN 7845022 Morford Road bridge over Stratton Creek.~|~10 - Bridge Replacement~|~5D5E2DE8C9E4445694E489E8B193A7C479AF8818 126435~|~1~|~1~|~01/STR~|~Chip SealASD-89-5.394 to 8.915; ERI-113-15.504 to 19.306; LOR-57-0.00 to 2.798; MED-162-0.00 to 2.090~|~05 - 4R Maintenance - Resurfacing~|~0314B17B6D46B779A209805A6147F5C45FA692EF 126435~|~1~|~2~|~02/NFA~|~Chip Seal MED-606-0.00 to 4.257~|~05 - 4R Maintenance - Resurfacing~|~B49FB237D7DC3C5C3B467C83549DCD6BB078EBEC 98158~|~1~|~1~|~01/S>2~|~Widening of Broad Street (SR-444) between Sandhills Road and Spangler Road, from 2 to 3 lanes to provide a center turn lane, installation of curb and gutter and storm sewer, and installation of sidewalk on both sides of the roadway.~|~04 - Reconstruction - No Added Capacity~|~E14CA7EB1DD61D3E835B8F9A762A2382173018DA 110007~|~1~|~1~|~01/NHS~|~Pruning~|~44 - Other~|~63C46356B673172B104FA4D3F889BD2A49201318 118689~|~1~|~1~|~01/ENH/STPK~|~Bridge Replacement.~|~04 - Reconstruction - No Added Capacity~|~B95E3510CD8915453A464F36D93B3494AD17E0D8 121447~|~1~|~1~|~01/IMS~|~Plan split for reconstruction of I-75 (no capacity added).~|~04 - Reconstruction - No Added Capacity~|~B31224C09D802ECFCCDE2FFA43572C5C5246FDA7 121447~|~1~|~2~|~02/IMS~|~Plan split for I-75 reconstruction with widening (added capacity).~|~03 - Reconstruction - Added Capacity~|~4330EC764E2DA3C205D2BEFC7370FDD7B2C45E09 121447~|~1~|~4~|~04/NHS~|~Plan split for reconstruction of SR 562 (NHS system).~|~04 - Reconstruction - No Added Capacity~|~EB52BD09CD74EA671987EA54AA0BD935AD919B66 121447~|~1~|~3~|~03/IMS~|~Plan split for I-75 bridge replacements as well as the SR 562 ramp bridge over I-75.~|~10 - Bridge Replacement~|~77315E5F9630ED6536D6673A45A466F1AEBC8304 121018~|~1~|~1~|~01/STR~|~All work is within this split~|~10 - Bridge Replacement~|~3817F7140D20C7DD312E2BCC414A3E4561514B0D 120769~|~1~|~1~|~01/NFP/MILL~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A8F342A347553F06484781C37EF087EC26132AF6 109979~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 550 9.21.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A42DDFCE3BB577EA1FEC370A0C25E0B4F3433B6 119848~|~1~|~1~|~01/NFP~|~Resurfacing project on MOE CR 29 7.02-10.49 and CR 29A 0.00-0.10. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~22BB14E1A6A6990900FEDBA255F94166CE857E0A 101273~|~1~|~1~|~01/STR~|~WIL-US 127 from SLM 15.05 to 20.25~|~05 - 4R Maintenance - Resurfacing~|~8B5C4A462D754E817ED08519661F415E54A30E10 121000~|~1~|~1~|~01/NHS~|~plan split to resurface HAM-126~|~05 - 4R Maintenance - Resurfacing~|~C4D44CD59ADE1F9F3A40437354079264E9D960E8 121000~|~1~|~2~|~02/NHS~|~plan split for Major Investment funded pavement reconstruction~|~04 - Reconstruction - No Added Capacity~|~43A4F2FDD6D6D099562E70F6B4A33FBE9EF17EA9 111665~|~1~|~1~|~01/STR~|~Culvert rehab~|~04 - Reconstruction - No Added Capacity~|~7CC917014FC9E4EB2309B6366EACF6191A08E3D2 117040~|~1~|~1~|~01/BRO~|~Plan split for all work on LUC-65-0535~|~13 - Bridge Rehabilitation~|~8B020EB662CAA96AF382D0D08C07F1036A00EBA7 107805~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 124 2.12-2.14. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~956151B5797E31BBF022DC8C086AEBE752E44B4B 106131~|~1~|~1~|~01/S<2~|~New Sidewalk on Carnation Drive in the City of Wapak (SRTS).~|~28 - Facilities for Pedestrians & Bicycles~|~9253CE4AF2D146A8E7EC45D0F327506838435AD7 110256~|~1~|~1~|~01/MPO~|~Construct a two way in street cycle track in the south curb lane of West Third Street from Ludlow Street to Robert Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~62D1351B673F459034223E8C8397F09E4A1BA6F3 100237~|~1~|~1~|~01/NFP~|~Chip seal ATB SR 7 from 0.00 to 2.37 and 18.42 to 21.00, ATB SR 166 from 0.00 to 2.61, POR SR 88 from 13.70 to 16.43, TRU SR 7 from 25.04 to 27.80, TRU SR 193 from 14.91 to 17.78 and TRU SR 305 from 0.00 to 1.57.~|~99 - State Preventative Maintenance~|~397E25B6B860E16C6F654738125FABD3D3E357F4 98515~|~1~|~1~|~01/STR~|~The bridge in this project meets the state but not the federal defination of a bridge. Federal and state funds from the District Preservation Program budget. No local funds.~|~13 - Bridge Rehabilitation~|~BAA4B7D39BA1ED419EFFE1F2E2ABDEB736A8BA85 113677~|~1~|~1~|~01/SAE~|~100% Safety funded items - Signal items~|~21 - Safety~|~A0F244B8B0C07A7A615F78F5478150974E64C5D4 115905~|~1~|~1~|~01/MPO~|~Plan split for eligible MPO funded sidewalk work.~|~28 - Facilities for Pedestrians & Bicycles~|~D66D08A4B19A09F121787E91818714E9964ABA54 120419~|~1~|~1~|~01/NFP~|~Established Plan Slit 01/NFP/OT ~|~17 - Construction Engineering~|~FB1B0FB543305F2D6D8EC3F567DA7EA455577471 91869~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 2303213 FAI SR256 13.33 Intersect: Paw Paw Creek #; BR Eligible for Replacement: Length=99 SD/FO(1) SR=54.8 DSR=4~|~10 - Bridge Replacement~|~4419933E90EE8737F55684BA4DA36E3E20F5973E 91869~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 2303183 FAI SR256 9.95 Intersect: Poplar Creek; Not BR Eligible for Rehabilitation: Length=123 SD/FO(0) SR=93.0 DSR=6~|~13 - Bridge Rehabilitation~|~4A113A4459DD48CFE7C93C4BDA6C008A482DA7C6 101165~|~1~|~1~|~01/STR~|~SFN 7402465 Span length 10 feet.~|~~|~BB3ABCD1A03F95A99A757CD4F69315CEA6FF07AC 91915~|~1~|~2~|~02/STR~|~Pave culvert inverts. VIN 50 20.68 (SFN 8200483). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~48A012A4E5C541E3CA51DDDD01DB34F6EFC44AF1 91915~|~1~|~1~|~01/BRO~|~Pave culvert invert. GAL 35 11.16 (SFN 2701049). BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~85563DCB51F9C870D3FF9BDB96D5AFCA846671F9 82472~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing of the existing roadway with Item 448, asphalt concrete (2 lane resurfacing) on DAR SR 571 from 0.00 to 6.73.~|~05 - 4R Maintenance - Resurfacing~|~1776AF7426C70B99D23EF5ADECFAFFB3FE836DB3 121311~|~1~|~1~|~01/NFP~|~Created for TID involvement~|~44 - Other~|~F657671F8E1E2C7DC69689BD5D29EE59F546175A 112192~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties.~|~21 - Safety~|~A124836AF44253A2032B1091512A831B6246838A 91527~|~1~|~1~|~01/BRO~|~Concrete deck overlaySFN 6500390, PIC-22-18.37, over Hargus Creek01/BRO/BR/~|~13 - Bridge Rehabilitation~|~6166398F308DF09B0913644A0ABFCCD5636B9E2A 122000~|~1~|~1~|~01/STR/SOME~|~Pedestrian Safety Improvements~|~17 - Construction Engineering~|~2EDF4C76AF76C2C02C4D19D9D109EDE9A2BC8518 114770~|~1~|~1~|~01/STR~|~Chipseal in HIG & ROS~|~05 - 4R Maintenance - Resurfacing~|~73AAD61C0D498195B6C2D90470A5280ECF1096F7 114770~|~1~|~2~|~02/S<2~|~Chipseal on ROS 28.~|~05 - 4R Maintenance - Resurfacing~|~5BD2A95B858E914F9696FE4F53E9C22727EE6F04 85872~|~1~|~1~|~01/MPO~|~Installation of a minimum 10' wide shared use trail connecting Little Miami Golf Center to Clough Pike, with related drainage, extend culvert, and rail crossing at Debolt Street area. Sponsored by the Hamilton County Park District~|~28 - Facilities for Pedestrians & Bicycles~|~E3F64CFDA3EAE01531C819FF8947DDCCD476A1C4 85872~|~1~|~2~|~02/NFA~|~Work that was added via change order to be paid by the Hamilton County Park District.~|~28 - Facilities for Pedestrians & Bicycles~|~B9FCC876A4E44C3188363F84A15CE82ACD564E7B 105097~|~1~|~1~|~01/NHS~|~D09 Culvert Liner Project PIK 23 15.35 (CFN 1813253)~|~04 - Reconstruction - No Added Capacity~|~79AAE8912BAAAC5122A18BF60B50C150DD1C5936 93567~|~1~|~2~|~02/ENH~|~100% City of Huron items~|~~|~EC634FDD1EBCE249488377F9BC2E82201CDB48ED 93567~|~1~|~1~|~01/ENH~|~on bridge structure - Lighting replacement and parapet wall repair project.~|~~|~F1B329963804F2A205E782A937747E63854BF9DC 93567~|~1~|~3~|~03/ENH~|~Added Plan Split 2--100% local items for Alternate #1 lighting per 8/11/16 letter from A. White stating availability of money.~|~~|~11A95B63CD4E6290BCB29BB00CE9FE18D4DD39FC 88299~|~1~|~1~|~01/SAE~|~ Sidewalks along Poole Road from Cheviot Road to Colerain Elementary School; Warning signing at Poole / Livingston intersection.~|~21 - Safety~|~DE1C23DF9B92710C4EE65D39A9F14FCD61895E37 87205~|~1~|~1~|~01/STR~|~The split is for work funded with rural STP funds and a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~3AC7E51240DD3B705904C3DE586B9C23D8BBBEB2 88994~|~2~|~2~|~02/S>2~|~Drainage and Water line reconstruction not effected by the project.~|~04 - Reconstruction - No Added Capacity~|~0B0BCAB0B78334A19246A0B4728D2EAD964BF9EC 88994~|~1~|~1~|~01/S>2~|~Friendsville Road Widening Project in the City of Wooster using Small City Funds~|~04 - Reconstruction - No Added Capacity~|~503EDBFFC76C08024E7D63AF3DD2593498E96408 108547~|~1~|~1~|~01/SAF~|~Construction of diverging diamond interchange (DDI) at SR-82 and SR-46 in Howland Township, Ohio.~|~21 - Safety~|~823C60FD9F65693E0D49165F123EDCFA2E47A2FB 108547~|~1~|~6~|~06/S>2~|~Installation of camera.~|~21 - Safety~|~97A61EE7E56BB19FE3C2BF71DEC405FA7273AEB5 108547~|~1~|~5~|~05/S>2~|~Waterline relocation along SR 46 paid by the Trumbull County Sanitary Engineer.~|~43 - Utilities~|~05D9D06ED61C2A12EE262EA3CAC1D0159EE2FA62 108547~|~1~|~2~|~02/NHS~|~Replacement of TRU SR-82 structure (SFN# 7804652).~|~10 - Bridge Replacement~|~023332FE345659F12EE49EF90FC840EF1D4C795B 108547~|~1~|~4~|~04/S>2~|~Replacement and modification to culverts on SR 46.~|~04 - Reconstruction - No Added Capacity~|~FD1F3EF7E31CF88EF185E59FF0DE43A07C343F5D 108547~|~1~|~3~|~03/NHS~|~Replacement and modification to culverts on SR 82 and SR 46/SR 82 interchange ramps.~|~04 - Reconstruction - No Added Capacity~|~25E4CA8F9CA24F79FCA2F320EB332B65780C2C3A 119075~|~1~|~1~|~01/MPO/MAS~|~Improvements to the intersection of Mason Montgomery Road with Tylersville Road.~|~21 - Safety~|~FDBBB080940AD301F27717676C10D058F9089222 90696~|~1~|~1~|~01/MPO~|~resurface Suder Ave from Manhattan Blvd to Kroger Dr~|~05 - 4R Maintenance - Resurfacing~|~7512703EB1DF74C334C2A3B70D971981F8EF6677 90696~|~1~|~2~|~02/NFP/TOLE~|~This plan split is for the waterline which is not eligible for federal funds~|~05 - 4R Maintenance - Resurfacing~|~7DA53390A6103C7CC6DC3A56517E2F00882465BB 86954~|~1~|~4~|~04/NHS~|~Bridge rehabilitation of SFN# 7707444, SUM-SR91-20.08 over Tinkers Creek, in the City of Twinsburg, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~19255FB41B7A88D33C23DD715BC1D2052CB8A2E0 86954~|~1~|~5~|~05/S>2/TWIN~|~Resurfacing of SUM SR 82 from 7.36 to 8.01~|~05 - 4R Maintenance - Resurfacing~|~49E8B70B9E5F54509049865CFE28187B9EE7B35F 86954~|~1~|~7~|~07/NHS/TWIN~|~100% Local items related to Guardrail, Catch Basins, Signals.~|~05 - 4R Maintenance - Resurfacing~|~9701DC93E22F3CA87E4E54FE337F7AB088C3799E 86954~|~1~|~3~|~03/BRO~|~Bridge rehabilitation of SFN# 7707363, SUM-SR91-19.37, over Branch of Tinkers Creek, in the City of Twinsburg, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~9E192AF1CBC32EA10644B76BCBB709DECC11ACEF 86954~|~1~|~6~|~06/MPO/TWIN~|~Partial depth repairs, full depth repairs, and ADA ramps, eligible for MPO STP.~|~05 - 4R Maintenance - Resurfacing~|~AF5203F78CBFAEBF2A7F77B1DA7DD2E8AE7B87EF 86954~|~1~|~1~|~01/NHS~|~Resurfacing of State Route 91 from SLM 17.21 to SLM 17.75 in Twinsburg Township, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~B1362E37E09E9B1E7FF87423B1CDE2FB07BED29B 86954~|~1~|~2~|~02/NHS/TWIN~|~SUM SR 91 from SLM 17.75 to SLM 19.14 and SLM 19.27 to SLM 21.11 in the City of Twinsburg, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~DA06444A53494474A06AEF07EFB8014C189343F9 101701~|~1~|~1~|~01/NFA~|~Bridge replacement project funded by OBPP. MOE CR 29 0.85, SFN 5630908. Not on any federal aid system funded 100% federal (20% TRC).~|~10 - Bridge Replacement~|~86F220E03C59E8A60208F9B9EF619405E0149078 93549~|~1~|~1~|~01/SAE~|~Port Clinton school zones.~|~21 - Safety~|~5AE547AEE381E9A7DEDDE4BE3BE3422D74829AE2 112919~|~1~|~1~|~01/STR~|~SCI 335 11.27-16.00SCI 348 6.70-12.80~|~05 - 4R Maintenance - Resurfacing~|~25438E3C1FC518983364F0A5E486DB5A55C05459 92299~|~1~|~1~|~01/ENH~|~Installation of new sidewalks, pedestrian lighting, and other scenic and environmental enhancements on State Route 219 (Main Street) from the West Corporation Limit (SLM 8.55) thru Coldwater to State Route 118 (Second Street) to ODOT section (SLM 9.31).~|~31 - Landscaping & Other Scenic Beautification~|~4540C1D925AA2631D8AA0BD3707D8BF8C0E361CE 87547~|~1~|~1~|~01/S<2~|~A small City funded proejct to widen SAN CR6 3.71-4.22~|~03 - Reconstruction - Added Capacity~|~FA9C41098BAA2C47DF6830A6CAB599808CE047FC 112772~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement~|~21 - Safety~|~DB1A9C4DD8C2CE52D5A61CBEAE41973C76107CF7 95639~|~1~|~2~|~02/IMS~|~New structure: Ramp A2 over IR 70, IR 270 & Ramp D2New structure: Ramp C1 over NS RR~|~08 - Bridge - New Construction~|~EC4B36C08830E370E2350157C9E3B76F029FE745 95639~|~1~|~3~|~03/IMS~|~Lengthen IR 70 Ramp C1 & G1 box culverts over drainage ditch~|~13 - Bridge Rehabilitation~|~06E9EFFE446406D2B8D8CA2AEAE7D4D6A7CAE795 95639~|~1~|~1~|~01/IMS~|~New ramp pavement, widening IR 70 and Scarborough Blvd pavement~|~04 - Reconstruction - No Added Capacity~|~35DC11D6A93C14C50E547819D0F8A0EAB13100AE 117961~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenane~|~21 - Safety~|~6369C152EAB25A2794D738CB115543CFB22F567B 117961~|~1~|~2~|~02/IMS~|~Plan split for ITS work on IR-475~|~21 - Safety~|~9984B5F632C71A19A2E0004FC70D2A6AC5808636 117961~|~1~|~3~|~03/NFP~|~Bridge repair due to fire damage~|~~|~A4636D7BEEB5887B4E58113A0C96ACEC47C10B7A 101321~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for the following STP Rural routes: DEL-229-0.00-0.12 DEL-42-9.51-19.17 MAR-47-2.09-9.11 MAR-229-0.00-1.05 MAR-529-0.00-9.29 MRW-61-3.27-13.18/14.83-22.86 MRW-95-0.00-19.73/0.00-1.15 MRW-229-0.00-5.30 MRW-529-0.00-3.29/4.22-8.33 MRW-42-0.00-12.71~|~05 - 4R Maintenance - Resurfacing~|~5DEEAD1BEABF7F62F44ECC7C63D7CBE8947BC18B 101321~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for the following STP Rural routes: DEL-229-0.00-0.12 DEL-42-9.51-19.17 MAR-47-2.09-9.11 MAR-229-0.00-1.05 MAR-529-0.00-9.29 MRW-61-3.27-13.18 MRW-61-14.83-22.86 MRW-95-0.00-19.73/0.00-1.15 MRW-229-0.00-5.30 MRW-529-0.00-3.29/4.22-8.33 MRW-42-0.00-12.71~|~17 - Construction Engineering~|~7B351F94AE2F93F944E496BA191D13ABABAEDFCD 108913~|~1~|~1~|~01/NFP~|~Roaming Road improvement.~|~44 - Other~|~F8B6487E720D2D491E1641ADCC39BF7BE02B7A0E 105191~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE Clarington Village Market Street Bridge (SFN 5660068). Funded 95 federal/5 local.~|~10 - Bridge Replacement~|~FDBFC37CAF125DD5D2F5252F45335AB96F7EABD8 93119~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4506480 LIC SR661 8.81 Intersect: Sr661 Over Cranetown Run; Not BR Eligible for Replacement: Length=59 SD/FO(1) SR=57.6 DSR=7~|~10 - Bridge Replacement~|~8583E8CC0380C0B88B7E529F6FF2020033C85C52 93119~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4506367 LIC SR661 1.58 Intersect: Sr 661 Over Clear Creek; Not BR Eligible for Replacement: Length=67 SD/FO(0) SR=56.4 DSR=5~|~10 - Bridge Replacement~|~C73E640EF151762467C192BB5976FD6764BEA8A3 102697~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. WAS SR 339 4.38-8.56. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~45581A1895EA03DDB6F3054798EB8359A3A73C84 102697~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using a microsurfacing treatment. ATH US 33 4.38-11.09 and MEG SR 32 0.00-3.83. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C6B70DD0C8AEAECC5B76FBCC6B18548A62E8754E 122242~|~1~|~1~|~01/SAF~|~Construct sidewalk and ADA compliant pedestrian crossings along Grand Blvd (CR-21) in the City of Hamilton to improve access and safety to Crawford Woods Elementary School.~|~28 - Facilities for Pedestrians & Bicycles~|~AB0981F32CA7F364B2BA1DF49146200715A680C1 77476~|~1~|~1~|~01/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~260AEB5F0021E7E936E2D15FB0D892F8BEEEAAA4 99878~|~1~|~1~|~01/SAE/LCEO~|~"01/SAE/OT/LCEO" - Licking County Guardrail replacement/new at various location - Approved CEAO funding max of $300,000 for FY19~|~21 - Safety~|~2519E3BFFBBCDA29917BDC41DEDC1F83B328A34F 122187~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-E~|~~|~1D680EF39969EEBFE89BB6BF398812993033AF09 113491~|~1~|~1~|~01/NFA~|~Created for potential J&C involvement~|~44 - Other~|~07A0AACB3A45C7FF5037D34523C154FF115B3479 117667~|~1~|~1~|~01/STR~|~Bridge deck replacement project. MOE SR 800 15.32, SFN 5603242.~|~13 - Bridge Rehabilitation~|~72D804D132FD6DB7965EA79F567459C0D2CB044E 118889~|~1~|~1~|~01/STR~|~All items of work associated with SLM 4.02 to 9.73.~|~05 - 4R Maintenance - Resurfacing~|~6C67A67630D9CF2AD237653ECF97A1934D9AD305 92968~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Kno-US 36-10.14 to 14.71~|~05 - 4R Maintenance - Resurfacing~|~EF692BA7A7EB3F9188E335926D70FAF3D1B0A178 92968~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on OFAH-Urban routes: 1) Kno-SR 308-00.00 to 00.96; 2) Kno-SR 308-01.32 to 02.18; 3) Kno-SR 768-00.48 to 01.70; 4) Kno-US 36-14.17 to 14.98; 5) Kno-US 36-20.68 to 20.77~|~05 - 4R Maintenance - Resurfacing~|~0156023821E58AA11BEE68C2A0143441295DA10F 92968~|~1~|~7~|~07/NFA~|~District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on NOFAS-Rural routes: 1) Kno-SR 308-00.96 to 01.32; 2) Kno-SR 308-02.18 to 03.00;~|~05 - 4R Maintenance - Resurfacing~|~D7DB4526DFEFFE01D387F247A5B994CEEC97E4E6 92968~|~1~|~3~|~03/S<2/MTVE~|~District Preservation TDIF Urban Paving 4PF7(80% Federal) / 4BG7(20% Local - City of Mount Vernon) - No CAP - Resurfacing with related work on: 1) Kno-SR 768-00.00 to 00.48; 2) Kno-US 36-20.77 to 20.82~|~05 - 4R Maintenance - Resurfacing~|~9ED258B942B995ABDFB63089504FF86D7CD9D8D6 92968~|~1~|~4~|~04/NHS~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on NHS routes: 1) Kno-US 36-14.98 to 15.32; 2) Kno-US 36-15.35 to 16.53; 3) Kno-US 36-16.58 to 16.80;~|~05 - 4R Maintenance - Resurfacing~|~921C0216A83197DFE9437DC12131689A64E43842 92968~|~1~|~9~|~09/NHS/MTVE~|~City of Mount Vernon TDIF 100% Items - 4BG7(100% Local City of Mount Vernon) - No CAP - Curb Ramps and other 100% Requested work on the NHS routes: 1) Kno-US 36-18.14 to 20.68;~|~05 - 4R Maintenance - Resurfacing~|~36C7A9A2B3E8B31CA3CBA6C545FBC5D353072904 92968~|~1~|~5~|~05/NHS/MTVE~|~District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local City of Mount Vernon) - No CAP - Resurfacing with related work on the NHS routes: 1) Kno-US 36-15.32 to 15.35; 2) Kno-US 36-16.80 to 18.14; 3) Kno-US 36D-00.00 to 00.01; 4) Kno-SR 13D-00.00 to 00.70; 5) Kno-SR 13-10.88 to 11.02;~|~05 - 4R Maintenance - Resurfacing~|~AAB5832113021C5DE0CB9BBCE3426929CB58907E 92968~|~1~|~8~|~08/NHS/MTVE~|~District Preservation TDIF Urban Paving 4PF7(80% Federal) / 4BG7(20% Local City of Mount Vernon) - No CAP - Resurfacing with related work on the NHS routes: 1) Kno-US 36-18.14 to 20.68;~|~05 - 4R Maintenance - Resurfacing~|~3060BB1F0D9F924F66E4B91C6B6A8E5D65041048 92968~|~1~|~6~|~06/NHS/MTVE~|~City of Mount Vernon 100% Items - 4BG7(100% Local City of Mount Vernon) - No CAP - Curb Ramps and other 100% Requested work on the NHS routes: 1) Kno-US 36-15.32 to 15.35; 2) Kno-US 36-16.80 to 18.14; 3) Kno-US 36D-00.00 to 00.01; 4) Kno-SR 13D-00.00 to 00.70; 5) Kno-SR 13-10.88 to 11.02;~|~05 - 4R Maintenance - Resurfacing~|~84ECDEA4BAFCB4EC455E791A5EDC30E25C5BB83D 90789~|~1~|~1~|~01/MPO~|~Construction of bike lanes on Helena Street from North Bend Boulevard to Keowee Street and a separated bike path on Keowee Street from Helena Street to Hillrose Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~FE0ED46F78C3ADACE21653A92B6594A278AC3678 110481~|~1~|~1~|~01/SAE~|~Improve the signalized intersections of Jackson & Washington, Jackson & Clay, and at the Jackson & Monroe in the Village of Millersburg with reflective backplates, implement ITE/ODOT intervals, cycles, offsets and splits, confirm that the pedestrian button are functioning properly and if not make the necessary repairs, install GPS clock assemblies at each intersection to maintain internal controller times automatically. Also, install radar detection at Jackson & Clay street on all approaches to provide flexibility to implement second car detection for left turn phases.~|~21 - Safety~|~6C7E66BE315ACBD61867CF14D30C786A88870023 112538~|~1~|~1~|~01/NHS~|~Preliminary Plan Split to program project. Update at time of scoping or plan file with work description matching final plans.~|~~|~DEA6738A0D61F9FC88C4BCE5150F674986BDCB2B 101732~|~1~|~1~|~01/BRF~|~Replace Caine Rd Bridge (SFN 0433101) over West Branch of the Ashtabula River. Bridge is approximately 0.75 miles east of Stanhope-Kellogsville Rd (CR 33)/Caine Rd (TR 579) intersection.~|~10 - Bridge Replacement~|~6E156B8A860F0655D8BC593C8455E39FDE2B0DC0 80122~|~1~|~1~|~01/BRO~|~Replace existing bridge (COL-644-0846, SFN 1505882) wirh a four-sided concrete box.~|~10 - Bridge Replacement~|~AD6187DBB0B216A75EB97B4F7E9B2ED48B53F878 84565~|~1~|~1~|~01/NFP~|~100% state funds. Funds from the District Preservation Program budget.~|~10 - Bridge Replacement~|~908DC6DD38E53BC9FF366854E2AECD395698FE18 125151~|~1~|~1~|~01/BRO~|~Plan split for all work on SEN-18D-0054 bridge~|~13 - Bridge Rehabilitation~|~BEF43F5407B4F35D357E8CDDF33D05E02A0657A3 99485~|~1~|~1~|~01/IMS~|~LOR 90 RM~|~05 - 4R Maintenance - Resurfacing~|~EA07E82156F76C2D174BEEBF36EFE268B1B4DD65 100096~|~1~|~2~|~02/MPO~|~Repair and resurface North Marginal Road and South Marginal Road that is functionally classified as Other Federal-aid route using MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E1DF3AFF001C26E230B89647727C4C2894E1471 100096~|~1~|~1~|~01/MPO~|~Repair and resurface South Marginal Road that is functionally classified as part of the NHS system using MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B3F89672ED55C743E286B76608E6238A3876F3A2 100096~|~1~|~3~|~03/NFA~|~100% City participation for items not eligible for any other funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6DC6A73EEC5F71BE2E96E2C669AC57E1D40890B1 104965~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS 530 5.42 (SFN 8404445). Not on any federal aid system funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~9E335F487B6759F86205F419371EDDBF65C88434 95449~|~1~|~1~|~01/NHS~|~Construction of shared use path adjacent to SR161 between Sawmill Road and Linworth Road.~|~28 - Facilities for Pedestrians & Bicycles~|~BCD20580CC65A994D165E4D6202317DB27D4CC0E 96973~|~1~|~1~|~01/SAF~|~Improve ped signals by upgrading ped equipment at 7 intersections in North College Hill and Mt. Healthy.~|~21 - Safety~|~6E2397FA7C6F5A8F6E2CB65EF874CEDF9907D089 123008~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties.~|~21 - Safety~|~2A0AC977552E4601C1FE39CA7BC58CC00C4DCF08 117925~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-76-B~|~44 - Other~|~5CED5758D617F27689A0E243522CA4932AB5576A 108652~|~1~|~1~|~01/NFP~|~Inogen Inc is one of several employers who have located in the former AG facility. The parking lots are now needed as public roads for the employees and truck traffic. The City of Brooklyn has decided to phase the overall project and this first phase will benefit Inogen. The removal, realignment and replacement of a quarter of the mile of American Road is the first phase.~|~01 - New Construction~|~F832D6D41E606204EA1AB83C872F066DF74CD59C 79758~|~1~|~2~|~02/NHS~|~Bridge deck patching and sealing.~|~13 - Bridge Rehabilitation~|~6AF5E6063B64096D1CDC69161969E0FBF1E998A7 79758~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A375CD7265F7FF3492E0DD62D8F54CA34C870B01 103972~|~1~|~1~|~01/STR~|~Pavement work in the Village of Arlington including full depth repair. All funds are from the District Preservation Program. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. There are no local funds in this split.~|~04 - Reconstruction - No Added Capacity~|~76FECA42DB507C1E538A8C3FD4423606F5A92E15 103972~|~1~|~2~|~02/NFP/ARL~|~Non pavement work in the Village of Arlington including curb and gutter, drive approaches and storm drainage. Approval for a grant and a loan from the Ohio Public Works Commission (OPWC) has been received. Any funds needs over what is available from the OPWC are the responsibility of the Village of Arlington.~|~44 - Other~|~2D2BCDFEFC37EA8669F03763FEB1495252325134 124790~|~1~|~1~|~01/SAF~|~Sign Replacement~|~21 - Safety~|~2C940E614C7C28C90D8678E348A43F0F3825F9E3 111899~|~1~|~1~|~01/SAF~|~Improvements to US62 to provide bike lanes and multi-use path on between Thurston Hall Blvd. and EB 161 ramps (non-NHS)~|~21 - Safety~|~EE223B0333A8B125E4E5555F14EACEA14CC6A90A 111899~|~1~|~2~|~02/SAF~|~Improvements to US62 to provide bike lanes and multi-use path on between EB 161 ramps and Walton Pkwy and Smith's Mill Rd (NHS)~|~21 - Safety~|~B194962A7449EF8F7CECE740AC06380A4C23CD5C 123433~|~1~|~1~|~01/BRO~|~Bridge railing replacement. ~|~13 - Bridge Rehabilitation~|~5E634F4D61B2FEADA200D07DEA00EC04DD97FB84 92981~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Mus-US 22-14.56 to 18.14;~|~05 - 4R Maintenance - Resurfacing~|~ED2D553672B5584BB38B44AEF5854A878648015A 92981~|~1~|~4~|~04/NHS~|~"04/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Other Principal Arterial Resurfacing on Mus-US 22-13.27 to 14.56~|~05 - 4R Maintenance - Resurfacing~|~AC4EB5C23C64339AF4DB6945AD5FEB4C6FEFD67F 92981~|~1~|~3~|~03/NHS/ZANE~|~"03/NHS/PV/ZANE" - City of Zanesville 4BG7(100% Local) - CAP $10,000.00 OPWC (4BG6) - For ADA Ramp compliance costs and any other additional work requested by the City of Zanesville.~|~05 - 4R Maintenance - Resurfacing~|~F655E86EF7D4895673305EB43CFB3BD0C7AED0F5 92981~|~1~|~2~|~02/NHS/ZANE~|~"02/NHS/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - CAP $389,990.00 OPWC (4BG6) - Urban Paving in the City of Zanesville: 1) Mus-US 22-09.76 to 13.27; 2) Mus-US 22D-00.00 to 00.30; 3) Mus-US 22D-00.48 to 00.80;~|~05 - 4R Maintenance - Resurfacing~|~69B09B020F61297AB95F83B619EA108BFB6CEA26 104492~|~1~|~1~|~01/MPO~|~MPO funds plan split~|~05 - 4R Maintenance - Resurfacing~|~82115882E1DABC4EBED37278F41DE4D2BFA39520 102283~|~1~|~1~|~01/NHS~|~Work to repair the damage to the bridge~|~13 - Bridge Rehabilitation~|~F6EC996B37E35BEECBAF1F0E4CBD6F5D74065E47 102283~|~1~|~2~|~02/NHS~|~Work on structure not covered by 4SR7 funding~|~13 - Bridge Rehabilitation~|~D9FB707F6C339FE5260179C66FDF547C5566CDD5 115137~|~1~|~1~|~01/NFA~|~Chip Seal MED SR 0606 0.00-4.26.~|~05 - 4R Maintenance - Resurfacing~|~FE67451B0EB31FA3E941FFB4AEED02F81B52A81C 127138~|~1~|~1~|~01/SAE~|~Application of pavement markings on various county routes in Fayette County.~|~21 - Safety~|~40D13C8E1C9D027D7FCA7DDF9F54CC4AF527088B 101319~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for the following STP Rural routes: FAY-729-0.00-4.05/4.56-5.44/6.61-9.68/10.50-14.82 FAY-734-6.78-12.56 MAD-729-0.00-1.75 PIC-138-0.00-9.13 PIC-762-0.00-8.85~|~05 - 4R Maintenance - Resurfacing~|~F434F060B8190CD5D481674BEC5D78B606A63E58 101319~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for the following STP Rural routes: FAY-729-0.00-4.05/4.56-5.44/6.61-9.68/10.50-14.82 FAY-734-6.78-12.56 MAD-729-0.00-1.75 PIC-138-0.00-9.13 PIC-762-0.00-8.85~|~17 - Construction Engineering~|~D1EC6391B6D33805569E32F0212843AD0BAF69A6 116268~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~16B6A98D8785340E63B1053BAC9D8B41D89A2BB6 126143~|~1~|~1~|~01/MPO~|~Created plan split for NOACA STBG funds~|~01 - New Construction~|~2809F9B933C22B5C4975079DE59026AF764C1DEC 119470~|~1~|~1~|~01/SAE~|~CEAO HSIP 100% funded~|~21 - Safety~|~5E67552E1712CE101861D50CCE6F4BFE262BB7E0 97872~|~1~|~1~|~01/SAF~|~Improvement of the sight distance, and correction of sub-standard grades at the intersection of SR-350 with CR-7 (Farmers Road) in Clinton County, OH.~|~21 - Safety~|~909F7FCA83E78FACA7499782371FAD5EC1A1DAFE 112246~|~1~|~1~|~01/NHS~|~Construction change orders~|~17 - Construction Engineering~|~D58067BBB78294F53F8ACC882F15E644CD9CDEDE 110383~|~1~|~1~|~01/STR~|~01/STR/OT/ - 90% Federal (4SF7) and 10% State (4SS7) - remediation of slide along COS-93.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~205F4E568DF33E178FA6C5FA84196F8C2C9367BC 126266~|~1~|~1~|~01/IMS~|~Bridge Maintenance Funding~|~47 - Bridge Preventive Maintenance~|~74AA4B001DB34BD9D54CE1110DABB7D29F6871D0 114028~|~1~|~1~|~01/NFP~|~Split for bridge work~|~47 - Bridge Preventive Maintenance~|~FFEE51A782CF708B1CD7C4753641B28943C68802 99790~|~1~|~1~|~01/NHS~|~Underdrain repair.~|~44 - Other~|~918E839746C69CA071E8AB7CDC0DD066FBA81EFD 99790~|~1~|~2~|~02/NHS~|~Consultant continuing services during construction.~|~17 - Construction Engineering~|~9FE99E9398CE4074C773A76E8C4C62AFE3871D13 121270~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~442C002AD11563225B753FF6C4280EFD23908C4A 121270~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~2817F94525EA131AF3AD7054CD9A75F552CD2726 94620~|~1~|~1~|~01/NFA~|~"01/NFA/OT/ " - Geological Site Management Funding - 4SS7 (100% State) - CAP of $430,000.00 - Rock Scaling of the Back Slope Face on Kno-SR 715 from 01.78 to 01.89~|~21 - Safety~|~4132FEDCE6B9AE310851EC908EBB54624E800618 116350~|~1~|~1~|~01/IMS~|~conduits linked~|~~|~531A27F17E34653EF46A10621BA10679F08C4E1D 95927~|~1~|~1~|~01/SAF/Alli~|~Replacement of two signals along US-62 at Fernwood and Liberty, in the City of Alliance, Stark County, Ohio.~|~21 - Safety~|~90BB8B9A186688873E1EC4D3D1D9AA4C32FA00A9 85105~|~1~|~1~|~01/NFP~|~ Minor rehab of SR 774 in Clermont County from SR 133 to the Brown County line.~|~05 - 4R Maintenance - Resurfacing~|~37363B17D6A1575DF4BF3E6ECE426E8775FF9038 87130~|~1~|~1~|~01/IMS~|~Geotech funded Slip repair~|~44 - Other~|~9C9D6771C43A2D9C18908CA92B18149FEBC8CD75 102217~|~1~|~1~|~01/NFA~|~LAW CR 121 2.43 ER Slide repair.~|~44 - Other~|~20A3A5F5878F60BB9EB354C13D907E7624C1BDD7 112877~|~1~|~1~|~01/NHS~|~PIC-23 from SLM 17.37 to 23.16~|~05 - 4R Maintenance - Resurfacing~|~A32868B0C1D3190CEE329FE0DC748F140A4CE225 104675~|~1~|~1~|~01/IMS~|~plan split~|~13 - Bridge Rehabilitation~|~01AC66B69609FBA650780A90FBA620E49518D3BC 117329~|~1~|~1~|~01/NFA/MCEO~|~Bridge replacement of MUS-CR 67-2.86 (SFN 6049192) carrying Piper Road over Salt Creek.~|~10 - Bridge Replacement~|~742D75728CA509CA6C3E3131021479F86B6962CD 117388~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~0DF41C7F5529332323789E28B6B0875B83B1556E 90652~|~1~|~1~|~01/STR~|~culverts at HEN SR281 0.76-0.77 and at HEN SR281 0.84-0.85~|~04 - Reconstruction - No Added Capacity~|~7A81876BBAE1AD8E54669F3EF2D4016301FE3539 116825~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~8703F7668F04531CDCFFDA687FA7D4E84D80C2E4 116825~|~1~|~2~|~02/S>2~|~Resurfacing~|~~|~6234C579CC1E2CDCE52335E0765EB77163F99D56 80599~|~1~|~1~|~01/ERD~|~100% federal funding using TRC, earmark OH210 to upgrade the interchange at IR 70/US 40/SR 331. This split also includes TRAC, local and district funding.~|~04 - Reconstruction - No Added Capacity~|~1B53E51264BD8ADD08A0FDEEDCEFA3A54B4CDF6E 80599~|~1~|~2~|~02/CMQ~|~CMAQ activities including turn lanes, relocating Hammond Drive intersection, improved progrssion for signal coordination, bike lanes, ped pathways, intersection/realignment of Covered Bridge Rd. Total CMAQ cap per BOM is $5 million.~|~04 - Reconstruction - No Added Capacity~|~70DFC5D8284ED36179D44D04F881145FBE6AC9F8 80599~|~1~|~3~|~03/BRO~|~2 bridges reconstruction: SFN 0702404 BEL-70-14.28L; SFN 0702439 BEL-70-14.28R with minimal approach work.~|~13 - Bridge Rehabilitation~|~24FB9C845785A35637DA21D1A1775B4499D19C6A 80599~|~1~|~4~|~04/BRO~|~Bridge replacement SFN 0705160 BEL-331-14.91, for non-CMAQ eligible activities.~|~10 - Bridge Replacement~|~E56668CB6CB28412E19334FA0630426C3EFA6D27 80599~|~1~|~5~|~05/BRO~|~Widen and replace bridge carrying SR 331 over IR 70 SFN 0705160 BEL-331-14.91. This split for CMAQ activities on bridge: turn lane, bike lanes and sidewalk. Total project Cap for CMAQ is $5 million.~|~10 - Bridge Replacement~|~F477F4920F088656949AD61C9C5E55CB4938619B 80599~|~1~|~6~|~06/STR~|~This split is for the Belmont County-owned waterline and sewer relocation costs. County share maxed at $900,000.~|~04 - Reconstruction - No Added Capacity~|~59E1D04010EA97C783061833B4BBDA60DE9BEC4B 84745~|~1~|~2~|~02/STR~|~Chip Seal - CRA-181-01.58 - 01.78/RIC-181-00.00 - 02.69 / HUR-162-19.98 - 23.53 / HUR-162-25.06 - 29.02 / LOR-162-0.00 - 08.79 / MED-162-00.00 - 02.10 / P & P Asphalt MED-162-02.10 - 02.97 (Spencer)~|~~|~5838EE1DA570845AD88789E01A1EAB4EFD67B8F1 84745~|~1~|~1~|~01/S<2~|~Chip Seal - Urbanized Area CRA-181-00.77 - 01.58~|~~|~A9521E13350888F2251672894BCAACFAF8BBE6B1 123790~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~6FFED6C4AC523C09EB1BD6EF032379D50A3D6B7B 95720~|~1~|~1~|~01/NHS~|~SAN-20 from SLM 18.68 to 26.52~|~05 - 4R Maintenance - Resurfacing~|~804001E18A50229A0220BA952AC372B76FD60B7C 96399~|~1~|~1~|~01/NFP~|~Construction of Salt Building on ODOT West Broad Complex~|~01 - New Construction~|~4811600209284D05F44D5B58902FCD281C72093C 101394~|~1~|~1~|~01/STR~|~DSR# BEL-005~|~04 - Reconstruction - No Added Capacity~|~5A1B2045C6FE655289A92C964C25141651B9BB03 94141~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~637679E8D77CF5F8A981E2709D2660BA2B65D374 94141~|~1~|~3~|~03/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~B7C17AE71EC8BAF430494BC7179390AF866553D9 94141~|~1~|~2~|~02/STR~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~207AFF976166CA54D874E21B6A63BC601AE85E6A 94141~|~2~|~4~|~04/STR~|~Superstructure replacement > 20' span.~|~13 - Bridge Rehabilitation~|~1591E7891C02E94AA5BE3BE40048BC2602ACE947 93303~|~1~|~1~|~01/SAE~|~Battery Backup for Traffic Signals on Various Routes in Stark and Summit Counties~|~21 - Safety~|~A8A9755D725420C25080482CDC8E7BC87581D410 108811~|~1~|~1~|~01/NHS~|~Rehabilitation of southbound weigh station for use as truck parking.~|~05 - 4R Maintenance - Resurfacing~|~5BCD6CDB28DCC9BB0E62A1A7F73B71472A8FB21A 122085~|~1~|~1~|~01/BRO/CRA~|~Replacement of SFN 1747495~|~10 - Bridge Replacement~|~6DE6743273EA03C80F9187C1F8B3D935CA245C1E 107343~|~1~|~1~|~01/NFA~|~D09 Guardrail FY24~|~21 - Safety~|~392E17472BAFB6A3A5E7DBD4609B6836C59F5912 98871~|~1~|~1~|~01/MPO~|~Add sidewalks on SR 5 (N High St) from W Main St to Phillips-Rice Rd in the City of Cortland.~|~21 - Safety~|~3F571E3072D06C70A023BA11B15D629D88D4F498 93003~|~1~|~1~|~01/STR~|~District Preservation Pavement Program using a combination of 100% 7BPB and 4PF7(80% Federal) / 4PS7(20% State) - CAP (See CAP Comments) - Resurfacing with related work on Per-SR 13-28.15 to 39.77~|~05 - 4R Maintenance - Resurfacing~|~C15009A4DD0036A95D408D83DD389D3B6A1BCC95 101731~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.0M.~|~17 - Construction Engineering~|~A2DB4CA52C2A6861BCB1E422EBDB8CD7FF3482CC 118500~|~1~|~1~|~01/MPO/KENT~|~Pavement work.~|~04 - Reconstruction - No Added Capacity~|~1E5072B8BD6930957286A9A36C4DC525801B06A5 99434~|~1~|~1~|~01/NFP~|~Hebicidal spraying on various routes throughout District 4.~|~44 - Other~|~96BEA0BBCFE8981A6E5D4F12BFA2AC2AEC509F9A 123738~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on interstate, no added capacity~|~05 - 4R Maintenance - Resurfacing~|~44A1DFB72FB5860EC4E46B914B254F89169B17B1 100157~|~1~|~1~|~01/S>2~|~80% federal w/20% local matching funds for project eligible work items.~|~05 - 4R Maintenance - Resurfacing~|~FB84A18B776B07E8519B02A08F70C90DA46729E6 121076~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~CD86281ADD56C33E4B0EEA05FD2F68DF2A69BD5C 124316~|~1~|~1~|~01/NHS~|~Vegetation Clearing around bridges in D11~|~47 - Bridge Preventive Maintenance~|~82762E93FA5F42331D496885BAF2C45D2DFBBF04 105124~|~1~|~1~|~01/STR~|~Culvert replacements - Split includes both sites on Federal Aid System: HOL-62 and HOL-514~|~04 - Reconstruction - No Added Capacity~|~9C01C7D8BCB0DE04C35A84D93AA3084714AC74EB 105124~|~1~|~2~|~02/NFA~|~Culvert replacement at HOL-179-0.08 location, not on the federal aid system.~|~04 - Reconstruction - No Added Capacity~|~C6698CD6C86517C96612B47C8CCA76DEB2A9F008 117933~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-F~|~44 - Other~|~AF02F1B326113B6794C373992CE03BFD06022913 102832~|~1~|~1~|~01/S>2~|~AC overlay with repair on DEL-750-4.43 to 5.65~|~05 - 4R Maintenance - Resurfacing~|~5587D4FE0BD6DD59F04E0E62A3E29E085E5A06A7 102832~|~1~|~3~|~03/S>2~|~Smoothseal DEL-750-7.06 to 7.26~|~05 - 4R Maintenance - Resurfacing~|~9A48A0A5FF67FEDE40B361D386AB1498C7ED909B 102832~|~1~|~2~|~02/NHS~|~Smoothseal on DEL-750-5.65 to 7.06. Includes deck sealing on structure over railroads~|~05 - 4R Maintenance - Resurfacing~|~8B82934B6BFE9366AEB6D41AABD804282C79EAFF 88791~|~1~|~1~|~01/S<2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4DF37E5F02B7D2FCC66037E8203DC56EC3382A55 88791~|~1~|~2~|~02/S<2~|~100% 4PS7 State Funded Item - Overlay Fabric~|~05 - 4R Maintenance - Resurfacing~|~597DB51254F33EF9D87BB87FABDD713B5DFD800B 105608~|~1~|~1~|~01/IMS~|~FRA 70, 71 and 270 locations and the associated bridges~|~05 - 4R Maintenance - Resurfacing~|~06A73E0104C156E354205CBC0B3554AC2D995BC9 105608~|~1~|~2~|~02/NHS~|~FRA 33, 40, 315 and 3 Locations and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~F08B1972449469D64666E72219BE36A0754BD136 105608~|~1~|~3~|~03/S>2~|~DEL 750 locations and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~7284D39E6DE2C7DF313A143B4839FCEE7D50321E 95606~|~1~|~1~|~01/CMQ~|~CMAQ & Columbus funding for widening of Lazelle Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~425E3A1A37D1E24D0A1E2FD5A9799BE682BDDA3F 118818~|~1~|~1~|~01/IMS~|~Plan split for resurfacing on IR 275 in Hamilton County.Also includes minimal approach slab work~|~05 - 4R Maintenance - Resurfacing~|~7BDB48331880450650EA2C3DAA329CB4AE564A26 115849~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2029.~|~~|~FD2029E1D552D9CE0779F0A3A9057C39F507A52B 109641~|~1~|~2~|~02/SAF~|~Plan split for Sen-67-2.68 RRFB location~|~21 - Safety~|~B2FC70B793C370616B1AD07D96DCDE560FEC2C3D 109641~|~1~|~1~|~01/SAF~|~Safety plan split for Hen-109-21.06 RRFB location~|~21 - Safety~|~7FCBB4C6CBC2B4EC7BBB288C97900C0002DDEA0B 124525~|~1~|~1~|~01/STR~|~stp rural~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D8F5D4FBA63E03842FCC05D7408B14C67D046247 106088~|~1~|~1~|~01/S<2~|~PIK 220 12.24 DSR# PIK-001~|~21 - Safety~|~1D1EB3CF1F3684B806D9E8DD4ABF36079B2110FB 101498~|~1~|~1~|~01/S>2~|~This project will add a multiuse path, sidewalk, curb & gutter, a traffic signal, and a pedestrian crossing. It will also include pavement resurfacing, striping, and drainage improvements. Yellow Springs Fairfield Road from Spangler Road to the eastern Fairborn corporation limit.~|~05 - 4R Maintenance - Resurfacing~|~3E93F8B07B6D3ED8408C880A9F26E86D65144AC1 102702~|~1~|~1~|~01/IMS~|~This plan split is for bridge work on Interstate bridge.~|~13 - Bridge Rehabilitation~|~533B104FF5C98794225CCD6709915D4A54E5E3F6 102702~|~1~|~2~|~02/STR~|~Pier encasement of rural bridge.~|~13 - Bridge Rehabilitation~|~99B652A6B66DAB75E467488E6F84F5DA4FF2684F 94236~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~65F494401623DD395EEE57469B583FBB7B0B81AA 123491~|~1~|~1~|~01/NFP~|~CO CE FY31-FY33~|~17 - Construction Engineering~|~18050ADDDAC3616726B02CA075CFE2B189A7D517 106400~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair projects. DSR ATH-006 ATH CR 44 4.37. Funded 80 federal/20 local.~|~~|~E26185C2C7129F91F08515C952896263B193B622 126805~|~1~|~1~|~01/BRO~|~Plan split to replace culvert type bridge carrying SR 212 over Thompson Run.~|~10 - Bridge Replacement~|~A6F6470524168FA0CD8BDAEA8D06759CF3A842D7 104491~|~1~|~1~|~01/NFA~|~OTT-TR44~|~05 - 4R Maintenance - Resurfacing~|~7534834DBC7351878026D684A7BEE25CAD00AA82 82292~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 7 25.81-35.72 (Gallipolis and Cheshire), MEG 7 0.00-4.48, 5.80-6.19. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~96B32CD8592E7634FA3AF494626D54EB024061BF 85202~|~1~|~2~|~02/STR~|~7803036 STRUSR00046**C TRU-SR-46 26.240 26.240 14.0 7802943 STRUSR00046**C TRU-SR-46 18.550 18.550 54.0 7802749 STRUSR00046**C TRU-SR-46 18.550 18.550 14.0 7802994 STRUSR00046**C TRU-SR-46 23.700 23.700 76.0 7802773 STRUSR00046**C TRU-SR-46 18.550 18.550 14.0 7802714 STRUSR00046**C TRU-SR-46 18.550 18.550 12.0 7802889 STRUSR00046**C TRU-SR-46 18.550 18.550 60.0 7802986 STRUSR00046**C TRU-SR-46 23.700 23.700 51.0 7802919 STRUSR00046**C TRU-SR-46 18.550 18.550 23.0 7802676 STRUSR00046**C TRU-SR-46 18.550 18.550 12.0 7802692 STRUSR00046**C TRU-SR-46 18.550 18.550 12.0 ~|~13 - Bridge Rehabilitation~|~81C36E436E43570528F006C171C1E775DD2CBF72 85202~|~1~|~1~|~01/STR~|~Resurfacing SR46 form 18.49 to 26.34.~|~05 - 4R Maintenance - Resurfacing~|~A8E32FF6C0D9824B26F9B045066B694E8444BD67 121479~|~1~|~3~|~03/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7F96E1073EE52F2F232DEC95E6B219E3C084C8BD 121479~|~1~|~1~|~01/IMS~|~Deck replacement and install new culverts adjacent to bridge.~|~13 - Bridge Rehabilitation~|~F2D9B1B49DE82428649B026CEE2F000FD8568A8D 121479~|~1~|~2~|~02/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E209AC062FA5230FDB95F7A848420F2C401A518F 98818~|~1~|~2~|~02/SAF/FRA~|~Up to $60,000 of safety funding for back plates & LED bulbs at the one Franklin County location of Cleveland at Innis~|~21 - Safety~|~4B9E4B2174477DFDC6741825FFBC32CE811A4BC2 98818~|~1~|~1~|~01/SAF~|~100% Safety funding for various back plates, LED bulbs, poles, wiring at all jurisdictions except FRA County~|~21 - Safety~|~FAE1D9212FF29A345750CFEC9BC708E86464661C 122880~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~EE8E2004CC1733F2516AB909D6271711C6C54917 122127~|~1~|~1~|~01/MPO~|~City of Dublin - Connect Emerald Parkway to Tuller Road including a new bridge over IR 270~|~01 - New Construction~|~5876C37A61470AC6D68CA023AB1DD97D6A4DE2FB 93903~|~1~|~1~|~01/SAE~|~101 G resurfacing purchase order contract. Mill and fill treatment to improve skid resistance on ATH 13 4.00-4.50, GAL 35 17.25-17.50 EB, GAL 35 16.90-17.60 WB, and MRG 78 14.15-14.80. 100% safety federal funds.~|~21 - Safety~|~4826F69D2BDDFCC9FFBEBEC7EB46991DB5CAF53E 106762~|~1~|~1~|~01/NFP~|~ODNR funded project at Burr Oak State Park Road R-X for a slip repair. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8A53CED7D0DA86B51C53554FEEE8ECB90B815A0F 89279~|~1~|~1~|~01/ENH/GRAN~|~"01/ENH/OT/GRAN" Granville Twsp pedestrian bridge project funded with Enhancement dollars total max $1,056,000~|~28 - Facilities for Pedestrians & Bicycles~|~3AD8B09EB5BAEEB8B910B61031F9AD91AA75A91F 102868~|~1~|~1~|~01/IMS~|~Micro surfacing Interstate routes~|~05 - 4R Maintenance - Resurfacing~|~AEE90FF9307F62A04EBD8C9FA0B44D4C02B9F824 102868~|~1~|~2~|~02/NHS~|~Micro surfacing NHS routes~|~05 - 4R Maintenance - Resurfacing~|~A3536360D28976979224AD32A6C0D8AD2C159A1F 102868~|~1~|~3~|~03/S>2~|~Micro surfacing STP > 200k routes~|~05 - 4R Maintenance - Resurfacing~|~4B12B296A0A1CD095A2B4BF90C8BE07E39D6B46E 102868~|~1~|~4~|~04/STR~|~Micro surfacing STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~E1418B562CC43FE8EEECE13FB9E9C98990A2FA43 104851~|~1~|~1~|~01/NFP~|~Split for bridge repair work~|~13 - Bridge Rehabilitation~|~DACEC0FEB059F54CD42324BBEA9782A66ED04721 96275~|~1~|~1~|~01/NHS~|~Bridge Sealing: CRA-30-17.29 / CRA-598-1.99 / CRA-602-0.76~|~44 - Other~|~44F9889F5EB1240B25DB8DB9B811EA79E97764D4 99919~|~1~|~1~|~01/STR~|~100% CEAO CSTP funding for pavement markings~|~21 - Safety~|~DB7CDDECC07029FB865F8301D1D9AF7FFAE0AF99 111000~|~1~|~1~|~01/STR~|~Split for bridge replacement~|~10 - Bridge Replacement~|~F328DC5CAC935EC0787E945ABB08D39A7BF2DC46 94223~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~6328BF575A5AD2641186EE9C12913DC42BCAF690 104810~|~1~|~1~|~01/STR~|~Resurfacing on the rural section of the route.~|~05 - 4R Maintenance - Resurfacing~|~D846CBDBA91DEEA538A09E3C66A55CF1B0ED8C0A 104810~|~1~|~3~|~03/S<2~|~Resurfacing on small urban route.~|~05 - 4R Maintenance - Resurfacing~|~EFFCBC69339791CE1C68A2F3FEFA0907773654C9 104810~|~1~|~2~|~02/S>2~|~Resurfacing on urban section.~|~05 - 4R Maintenance - Resurfacing~|~8FCB1C6814F6E7C0A27A499E5C8C3D7F7CE037F6 121719~|~1~|~1~|~01/S5K~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) LOR -254-0.00 to 2.806 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~E3E45516CC87324F6A2BE810A09A858BDC672E36 121719~|~1~|~2~|~02/S>2~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) LOR -254-2.806 to 2.811~|~05 - 4R Maintenance - Resurfacing~|~48CA3ED2102D188701151EBAE2BCE252E562A2D6 93156~|~1~|~2~|~02/S<2~|~General system paving of MAR-309: 14.48-15.35In Marion func class area~|~05 - 4R Maintenance - Resurfacing~|~6CCF12B75F7E504FA02834BD9339E41AE3A92C56 93156~|~1~|~1~|~01/STR~|~General system paving of MAR-309: 0-14.48In rural func class area~|~05 - 4R Maintenance - Resurfacing~|~8F60A0BC8926F6BFDC8A05A27D0A71474A8D0C02 93156~|~1~|~3~|~03/STR~|~Concrete deck overlay over Bell-Harraman Ditch SFN 5101530 - MAR 309-10.87~|~13 - Bridge Rehabilitation~|~AD5FCF47137D5FABD764C7C97C78A1CDF17EF832 94414~|~1~|~1~|~01/BRF/PCEO~|~"01/BRF/BR/PCEO" - CEAO LBR Funding 4B87(80% Federal) / 4BG7(20% Local) - CAP $429,600.00 Federal + 15% Credit Bridge CAP of $80,550.00 equals total federal of $510,150.00 - Rehabilitation of SFN 6434681 PER TR131 1.35 Intersect: Little Monday Crk; BR Eligible for Replacement: Length=33 SD/FO(1) SR=40.0 DSR=7~|~10 - Bridge Replacement~|~4769B721DF035C4A3F102C9CDDC36F143B5EEACE 115197~|~1~|~1~|~01/ENH~|~Replacement of small portions of the Regional Bike Trail as a result of utility cuts, root heave, and sub-surface conditions. The project will also include resurfacing as needed to extend the life of the trail making the most of the original investment.~|~28 - Facilities for Pedestrians & Bicycles~|~68D9B9A91E9160338938134B9FE8443A7701E525 100031~|~1~|~1~|~01/ENH~|~Construction of a 12' wide multi-use path that parallels Harrison Avenue on abandoned rail corridor between Marie Avenue and Lee Court.~|~28 - Facilities for Pedestrians & Bicycles~|~8BDCB97A8DBA0EEC09ACB0224CE96398DE1AB740 100031~|~1~|~2~|~02/ENH~|~Local will paying for a 2" electrical conduit for the future use by the police for emergency call stations.~|~28 - Facilities for Pedestrians & Bicycles~|~98799D9988C6791C0502509228F62BD55380A8CF 98997~|~1~|~1~|~01/S>2~|~Ottawa River Rd~|~05 - 4R Maintenance - Resurfacing~|~A40FE3B55936A7CBCBBFED37BB23789E6B942C60 112332~|~1~|~1~|~01/NFP~|~Plans split for GR maintenance~|~21 - Safety~|~9AD3590C4D9B064BAF2D1525CE22738DB0721DED 100912~|~1~|~1~|~01/IMS~|~plan split 1 added for purchase order ~|~~|~1AF197B8B181672E9670F09CDA5E6C0FFD76815D 100912~|~2~|~2~|~02/S50~|~plan split 2 added for purchase order funding~|~~|~2EF4D2183CEE0FE0AEAA4748FE1456A9D51FA78C 96299~|~1~|~1~|~01/STR~|~Bridge Replacement SFN 4003306, SLM 0.77~|~10 - Bridge Replacement~|~C001905AEBFCF09F0A262175484498CAC369D974 103069~|~1~|~1~|~01/S<2~|~Landslide repair project. MOE 536 1.96. DSR MOE-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D4C002485FA7618F89F841555B96A956BFDAC4C 116526~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~410803B930226D90F45D9D0FB5F20E6935D1125D 85251~|~1~|~1~|~01/IMS~|~Resurface WOO IR75 5.04-19.91~|~~|~E8D12AC2A1A4C914BA2F65324FAFA843EDB46C72 100061~|~1~|~1~|~01/NFA~|~Slide Repair LAW 215 16.70~|~44 - Other~|~E5521327728136A6C5E5F0ED74C5FF0E66616F5A 120122~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~1FE5B89778A72CF1BCB379D635EDC96D5505A787 104811~|~1~|~1~|~01/NHS~|~Replace decks on structures MAR-23-16.75 L/R~|~13 - Bridge Rehabilitation~|~F3641D2243B118128481D0C4A2ADFC748F8BE4B8 104811~|~1~|~2~|~02/NHS~|~Repair and deck sealing on MAR-23-18.15 L/R~|~13 - Bridge Rehabilitation~|~439DAE5FEED57A0B6C8EEEE98C28EF675CE7CDA9 126948~|~1~|~1~|~01/ENH/WARR~|~Repair sidewalk sections.~|~28 - Facilities for Pedestrians & Bicycles~|~C45A22411B0ACBC710C7DC45FB2EDE4D34265EC4 108980~|~1~|~1~|~01/BRF~|~Fed/State Exchange Bridge Plan SPlit~|~10 - Bridge Replacement~|~708114DECB8FBBD8A8369DBB2E236ABF6C75037C 98312~|~1~|~1~|~01/SAF~|~Install overhead flashing beacons at the intersection of SR 43 & SR 171 in Carroll County.~|~21 - Safety~|~EBCEAC2476EAC0A2647388B355C0F24756E5B91E 121245~|~1~|~1~|~01/SAF~|~District wide pavement markings~|~21 - Safety~|~6F8B1D8915616C83234FF425484539519D565CBD 92214~|~1~|~1~|~01/STR~|~WOO SR281 0.61-0.62 WOO SR281 1-1.01 WOO SR281 1.53-1.54 WOO SR281 3.05-3.06 WOO SR281 3.54-3.55~|~04 - Reconstruction - No Added Capacity~|~6847F7C93FF0A2F16D9AE75B03F33B815D596271 110583~|~1~|~1~|~01/STR~|~MRW 229 from SLM 5.43-6.49~|~05 - 4R Maintenance - Resurfacing~|~126006CCC106C8F34FEDDF754553AED6B3464109 118972~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding~|~21 - Safety~|~FF9110ECAD977EE4FD21B0E575FD532C01B80144 121971~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the construction of the roundabout~|~21 - Safety~|~96F945D9A454FC298AEFD9DB7EA55DDCCB88FE1B 123365~|~1~|~1~|~01/NFA~|~Resurfacing JEF-524 and CAR-524~|~05 - 4R Maintenance - Resurfacing~|~9249916F16CBB0D461AD9EBD3B1652F30382B5E0 123365~|~1~|~2~|~02/STR~|~Resurfacing CAR-542~|~05 - 4R Maintenance - Resurfacing~|~4791E0220C88D8730961C7B9CBCC425D04955607 111269~|~1~|~1~|~01/ENH/FRED~|~Items/costs eligible for TAP funding. Quantities include items included in Base Bid and Additive Alternate Bid.~|~28 - Facilities for Pedestrians & Bicycles~|~7F28D25FC6326D3DC43D989BFFEF87B02928EE36 117542~|~1~|~1~|~01/NFP~|~parking areas resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~18B49E562673FBD4DC2195FDB5875236DAAC0134 118697~|~1~|~1~|~01/STR/ASD~|~Pavement Marking~|~21 - Safety~|~460D3055C2EEEDC52222F27ADECDFCE2A8A53710 112312~|~1~|~1~|~01/NFA~|~Bridge rehabilitation project. HOC CR 174 0.30, SFN 3731731. Work includes a deck replacement with minor repairs on the abutments and piers. Federal/State Exchange Program funded 80% State/20% Local.~|~13 - Bridge Rehabilitation~|~F255BF118E6D9FD391B5A9E3FE54F2462EE4F7B5 107830~|~1~|~1~|~01/STR~|~FAY 734 and Bridges~|~05 - 4R Maintenance - Resurfacing~|~9212E9802BF75739F64F588EAA6386AE10891A8D 107830~|~1~|~2~|~02/NFA~|~FAY-753~|~05 - 4R Maintenance - Resurfacing~|~C320A737D88337CC9BD00AD1904653A59E95BBDD 102299~|~1~|~1~|~01/NFA~|~HIG TR 225 (2.09-2.74 & 2.97-3.25)~|~21 - Safety~|~598F5B01A61194BF9FA631C1A32B08CA06BDC307 88708~|~1~|~1~|~01/SAE~|~Safety project to add a turn lane at 25 onto I-475~|~21 - Safety~|~48085207038E64169A3174EFB6BE763BBCE8FE3C 110004~|~1~|~1~|~01/IMS~|~Work on HAM-275~|~05 - 4R Maintenance - Resurfacing~|~8AC1E568FBEBBBB47A7BFCF530DEC976C1FBB52F 110004~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~8089996698EB28A60DFE2A162AB49B7A3B1E1FB9 92213~|~1~|~1~|~01/NFA~|~Various county routes in Henry and Lucas Counties.~|~05 - 4R Maintenance - Resurfacing~|~02B5B4BD45558A25F153F85B453ED357F3750F6E 92213~|~1~|~2~|~02/STR~|~WOO-CR189 HEN-CR3 WOO-TR21~|~05 - 4R Maintenance - Resurfacing~|~39148576B184CA8CADBA04AE5D736DC611A66B97 92213~|~1~|~3~|~03/S>2~|~LUC-Waterville-Monclova Rd (LUC-CR124)~|~05 - 4R Maintenance - Resurfacing~|~9BF408643699BCC7B1BEF8200D70BA30B22A391F 86970~|~1~|~1~|~01/IMS~|~8706816 WOO US23 33.74 Intersect: Ir 75 Sbl & Ir 475 Nbl~|~13 - Bridge Rehabilitation~|~5999AB5EC96CD00DC74C5C958316886A405B3345 112263~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 26 & 27~|~17 - Construction Engineering~|~8BC959EF2E89DF3AB16016897879D1E1C1AC74DA 108054~|~1~|~4~|~04/S<2~|~Replace signs at various locations.AUG-US-33 SLM 2.54 to 16.30DAR-US-36 SLM 10.41 to 13.29DAR-US-127 SLM 13.16 to 13.31~|~21 - Safety~|~47C1E00E13A492FEF5F7A6C5F122DA9D96555976 108054~|~1~|~7~|~07/NHS~|~Replace various signs in the City of Riverside on SR 4.MOT-SR-4 SLM 20.40 to 22.00~|~21 - Safety~|~BCF427538F4C6160927421297AEACEA6AF39EBD4 108054~|~1~|~6~|~06/NHS~|~Replace various signs in the City of Dayton on routes US35, SR 4, SR 444 and SR 49.MOT-US-35 SLM 11.33 to 15.30MOT-SR-4 SLM 17.11 to 20.40MOT-SR-4 SLM 22.00 to 23.15MOT-SR-444 SLM 0.00 to 0.49MOT-SR-49 SLM 1.08 to 2.77~|~21 - Safety~|~85920762588F76ECFBD83EE6B2F51A0CDA636E4D 108054~|~1~|~2~|~02/NHS~|~Replace signs at various locations.CHP-US-68 SLM 0.00 to 0.31CLA-US-68 SLM 7.42 to 15.18CLA-SR-4 SLM 6.76 to 8.88LOG-US-33 SLM 10.89 to 26.40MOT-US-40 SLM 14.17 to 14.44MOT-SR-49 SLM 0.00 to 1.08MOT-SR-49 SLM 2.77 to 8.48MOT-CR-99 SLM 0.00 to 3.78MOT-CR-99 SLM 0.24 to 1.29MOT-CR-601 SLM 1.42 to 2.26~|~21 - Safety~|~15C9E535CBD79B69126CC9988614556ADE4B6891 108054~|~1~|~3~|~03/STR~|~Replace signs at various locations.AUG-SR-29 SLM 0.42 to 0.75CLA-SR-54 SLM 5.41 to 5.79~|~21 - Safety~|~2A25F949D5D1B4181908EEA198FDBA532FA948A9 108054~|~1~|~1~|~01/IMS~|~Replace Signs at various locations.AUG-IR-75 SLM 4.78 to 7.25CLA-IR-70 SLM 6.57 to 25.42MIA-IR-70 SLM 2.34 to 18.12MOT-IR-70 SLM 3.14 to 21.14MOT-IR-75 SLM 0.55 to 15.34MOT-IR-75 SLM 18.31 to 23.08MOT-IR-675 SLM 0.00 to 7.44SHE-IR-75 SLM 4.80 to 19.79MOT-75-IR SLM 15.34 to 18.31~|~21 - Safety~|~3774B5952867B5A6C9E2397508344BFA781FF28E 108054~|~1~|~8~|~08/S>2~|~Signs replace on Wagner Ford Road at the IR 75 interchange by Montgomery County Engineer.MOT-CR-218 SLM 0.00 to 0.36~|~21 - Safety~|~31725E2A931639D49B83D3747A72B22E21759DA7 108054~|~1~|~5~|~05/S>2~|~Replace signs at various locations.CLA-SR-72 SLM 12.96 to 13.50MIA-SR-41 SLM 11.13 to 11.49MIA-SR-55 SLM 9.56 to 10.13MOT-US-35 SLM 10.21 to 11.33MOT-US-40 SLM 14.44 to 14.56MOT-CR-53 SLM 4.66 to 4.67MOT-CR-53 SLM 4.95 to 5.45MOT-CR-99 SLM 1.58 to 1.80MOT-CR-99 SLM 15.43 to 15.45MOT-CR-116 SLM 0.01 to 0.09MOT-CR-230 SLM 14.11 to 14.39MOT-CR-601 SLM 1.26 to 1.42MOT-CR-601 SLM 2.26 to 3.20~|~21 - Safety~|~9A952087272CD050740947C42C196DA053587D27 124311~|~1~|~1~|~01/ENH/TWIN~|~Construction of a multipurpose trail.~|~28 - Facilities for Pedestrians & Bicycles~|~B30BD3E934EDFD82049006F700D56F043859EDE2 108405~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AA2D98A4AD174A71DA141C6B7AF5167B502DE75B 93482~|~1~|~1~|~01/IMS~|~Emergency funding for bridge on I-70 damaged by accident~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1237D6168924925A2C8E93A690EABEFA1D76AA25 114881~|~1~|~2~|~02/S>2~|~Plan split for resurfacing work on LUC-295 between SLMs 7.615 - 12.25~|~05 - 4R Maintenance - Resurfacing~|~6107EDD664ABFC0DBDA42A0CA2C6CAD884C4A68E 114881~|~1~|~1~|~01/STR~|~Plan split for resurfacing work on LUC-295 between SLMs 2.48 - 7.615~|~05 - 4R Maintenance - Resurfacing~|~15B6B57BE80363018DBD534FF6392AD8A317E7F8 116610~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items on FRA-670.~|~05 - 4R Maintenance - Resurfacing~|~FED7188EE79BAEA767BAAE18CEDE622918958021 119882~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~28 - Facilities for Pedestrians & Bicycles~|~4648B4C77806E93B9E5835C9BD116689050EADF9 101369~|~1~|~2~|~02/STR~|~Bridge painting project. GAL 588 1.69 (SFN 2700786) and GAL 775 9.265 (SFN 2704684). Rural other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~FDF297FFD59ACA0465B8CA8D2393CA96A6EF0964 101369~|~1~|~1~|~01/NHS~|~Bridge painting project. GAL 35 17.68 (SFN 2701448), GAL 35 17.43 (SFN 2701413), NHS route, Federal funds 80%/20% State.~|~47 - Bridge Preventive Maintenance~|~D239B7471391091C62B011F1DC256440D48A3BEE 93988~|~1~|~1~|~01/BRF~|~SFN Bridge Replacement on TR13 (Leesville Road)~|~10 - Bridge Replacement~|~3D4FF160A3E734E569CC993C7178684AFE7CE54D 113041~|~1~|~1~|~01/NHS/ASHT~|~Resurfacing, urban paving in the City of Ashtabula.~|~05 - 4R Maintenance - Resurfacing~|~01FEEC22D115230B694BA0F5426226D66FD0EFA5 113041~|~1~|~2~|~02/S5K/ASHT~|~Resurfacing, urban paving in the City of Ashtabula.~|~05 - 4R Maintenance - Resurfacing~|~B1888EFB5FA88B84BE60131805A0701332F7B986 113041~|~1~|~3~|~03/S5K/ASHT~|~100% City items for ADA curb ramps and full and partial depth repairs.~|~04 - Reconstruction - No Added Capacity~|~D31114A3DA59D6FFEB591B74250C2424BEDF7233 114578~|~1~|~1~|~01/STR~|~Rockfall repair project. MOE 78 24.46. Work includes drape and trim blasting. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~28A1B6C565DBB8AFF2B49619F7331F68FFD90717 84513~|~1~|~2~|~02/NHS~|~District wide bridge sealing.~|~13 - Bridge Rehabilitation~|~08811F6F31A0349811AB5B07CCF86ECB26DE831A 84513~|~1~|~4~|~04/STR~|~Bridge sealing for various Non-NHS STP bridges.~|~13 - Bridge Rehabilitation~|~211077920BD069704DF84AF8309339C953D60D9F 84513~|~1~|~1~|~01/IMS~|~District wide bridge sealing contract.~|~13 - Bridge Rehabilitation~|~4BDE4E146C7CB04993A8F2A0DF8C9EAF05C0CF35 84513~|~1~|~3~|~03/S<2~|~Bridge sealing for various bridges.~|~13 - Bridge Rehabilitation~|~500EF175890F82C43EC7DA9DC7AD453E07FA89FD 102194~|~1~|~1~|~01/IMS~|~Split for work on the sanitary sewer line over I-90~|~47 - Bridge Preventive Maintenance~|~9DE43769DAE4AAEE2060831242125DA84A93DC25 120371~|~1~|~1~|~01/NHS~|~Install traffic signal~|~21 - Safety~|~98C1AEBF76B2F7968A11F0252F5D59B31C1EC10B 108937~|~1~|~1~|~01/NHS~|~FY2022 Urban Paving in the City of Cincinnati on US 50. This plan split is the 80% ODOT and 20% City items on the Urban Portion of US 50.~|~05 - 4R Maintenance - Resurfacing~|~52D68AE1445934318181233E2996948B5C87D0B3 108937~|~1~|~2~|~02/NHS~|~FY2022 Urban Paving in the City of Cincinnati on US 50. This plan split is the 100% City items on the urban portion of US 50.~|~05 - 4R Maintenance - Resurfacing~|~C95771637C3175AF1332473767F81EFC77C596B4 102912~|~1~|~1~|~01/STR~|~Pavement~|~05 - 4R Maintenance - Resurfacing~|~5695B47F1603AA57EA0552DD453E1DA0041A4566 106535~|~1~|~1~|~01/BRF~|~HIG TR 239 0.88 (SFN 3632601)~|~10 - Bridge Replacement~|~F4D6D0DAF204FE8C7BE2325FB3207623DAAF1603 89009~|~1~|~1~|~01/NHS~|~Resurfacing project using and asphalt overlay and milling. Work includes curb ramps, pavement marking and inclusion of some minor counter measures from past traffic safety study. WAS 7 23.02-23.71. 80% Federal (WWW-MPO) and 20% Local.~|~05 - 4R Maintenance - Resurfacing~|~C85F1DAE27E1BDA2FA1E374F6EAC5E96C85F6BEA 89009~|~1~|~2~|~02/NHS~|~Resurfacing project using and asphalt overlay and milling. Work includes curb ramps, pavement marking and inclusion of some minor counter measures from past traffic safety study. WAS 7 23.20-23.71. 100% local items.~|~05 - 4R Maintenance - Resurfacing~|~E3D55204600C4A3CD5BABB4FE888D834F49F1FB0 113253~|~1~|~2~|~02/NFP/KENT~|~Items funded 100% by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~93C5B14A18BF9A7D845284670D715B18CB10751C 113253~|~1~|~1~|~01/S5K/KENT~|~Resurfacing of US 67 in the City of Kenton in Hardin County. 80% Federal funds from the District 1 budget with the 20% match provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~BE42A262053720B919F05F04A1FFA433778FA7BF 98569~|~1~|~1~|~01/STR~|~Plan Split for the pavement work in the rural portion~|~05 - 4R Maintenance - Resurfacing~|~EA137136464EE6C11A8C29FCB81534A6E2F6AF0D 98569~|~1~|~2~|~02/S>2~|~Plan Split for the pavement work in the large urban portion~|~05 - 4R Maintenance - Resurfacing~|~E5F5F81EA0696AB117072A4FED1AC50C8CDF7489 98569~|~1~|~3~|~03/STR~|~plan split for the bridge work~|~13 - Bridge Rehabilitation~|~082D4B314CD7A1591FE70CAA0E70B3487FAF1DF6 125525~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~21 - Safety~|~AF87B405D37378622158F5AEE0F7BF71547ED0EC 98555~|~1~|~1~|~01/STR~|~Plan Split for rural locations.~|~05 - 4R Maintenance - Resurfacing~|~47441B50BA4018AE08FCAF157AB8A664040C0EE1 98555~|~1~|~2~|~02/S5K~|~Plan Split for the Small Urban sections on GRE-380~|~05 - 4R Maintenance - Resurfacing~|~2D24EA7688D6E335E8CE20D5624464D48949FAEC 112711~|~1~|~1~|~01/STR~|~Concrete deck overlay on structure PIC-316-431 (SFN 6503020)~|~13 - Bridge Rehabilitation~|~925911A37849D1192BB54CBC6828408C0EB0B177 112711~|~2~|~2~|~02/S<2~|~Concrete deck overlay on structure PIC-762-033 (SFN 6503764)~|~13 - Bridge Rehabilitation~|~80F7271412D9DA60CA0EDCF7448F2D8F2467D117 102960~|~1~|~1~|~01/NFP~|~ASD-250-8.46-12.22.~|~05 - 4R Maintenance - Resurfacing~|~B874DA73FB00932396C512DFF71FDA4DCBB98319 102960~|~1~|~2~|~02/NFP~|~Bridge work ASD-179~|~13 - Bridge Rehabilitation~|~BCAA2FD31B5E04470324913257072D99B8E53628 88902~|~1~|~1~|~01/STR~|~Resurfacing SR153 9.87-14.69~|~05 - 4R Maintenance - Resurfacing~|~2B5E1C46BA26875686AB9823FE46CC26DADF7279 88902~|~1~|~2~|~02/STR~|~not BR Eligible: SFN 7605293 SR153 11.30 over Black Run~|~13 - Bridge Rehabilitation~|~63D388EB97F05A2053D65D6DED5514EA0C8A6D18 88902~|~1~|~3~|~03/NHS~|~NEW. Install rumble strips on US-30 from SLM 30.40 to 31.50. To be incorporated in Construction via change order.~|~21 - Safety~|~5FD6E126587BEE3B9181D2CC74D8234B7400662A 119930~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT~|~21 - Safety~|~799F6B17FFEF47ACDE9A1D48642BF5024B9480CD 95309~|~1~|~2~|~02/IMS~|~Work on interstate structures eligible for BR funds at 90/10 split: 1808591, 1808621, 1808656~|~13 - Bridge Rehabilitation~|~0C987F50652F6A7E913E229B8470E7F752BC519E 95309~|~1~|~4~|~04/NHS~|~Work on NHS structures eligible for federal BR funds: 4305884~|~13 - Bridge Rehabilitation~|~6C8FCE02EA56572F865198E7BBD56FE5041F4E4D 95309~|~1~|~3~|~03/NHS~|~Work on NHS structures at 80/20: 2801515, 2801523, 1814869~|~13 - Bridge Rehabilitation~|~78A17E23D6B77B485E757BC425186AAA970E50F1 95309~|~1~|~5~|~05/BRO~|~Work on other federal aide highway structures eligible for BR funds: 1801473~|~13 - Bridge Rehabilitation~|~C2E26527C840AAADA28058FA810F57BD1ADF5852 95309~|~1~|~1~|~01/IMS~|~Work on interstate structures at 90/10 split: 1812122, 1812130, 1813390, 1812149~|~13 - Bridge Rehabilitation~|~FB6704A1088B660629226A0F4DCD077CDE4A3C01 93277~|~1~|~1~|~01/STR~|~General system paving of MRW-95: 8.12-19.73~|~05 - 4R Maintenance - Resurfacing~|~F821A988DB181BCC47D1890D4E375D33DACF93BE 85296~|~1~|~1~|~01/SAE~|~Reconfigure SR-5 at New Milford Road intersection to restrict thru traffic and left turn movements from New Milford Road, Portage County, Ohio. ~|~21 - Safety~|~20D25084411D0FE5AB72D021227E563F90903BDE 105231~|~1~|~1~|~01/STR~|~Culvert repair.~|~04 - Reconstruction - No Added Capacity~|~33EB406F5F28129018CBF99BB2AB7D80E4FAF9F1 91667~|~1~|~1~|~01/NFP~|~4CP7 funding for mowing, litter pick-up, mulching~|~31 - Landscaping & Other Scenic Beautification~|~2B9C06E671BAE62207B26050DB9F698E680F9230 100889~|~1~|~1~|~01/STR~|~PIK 104 6.27 (SFN 6600999)~|~10 - Bridge Replacement~|~DFF68DB97C03AC7B1378BBCCF787A99257167DDF 114666~|~1~|~1~|~01/IMS~|~Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot.~|~13 - Bridge Rehabilitation~|~DF7E9B822FD4BC807D5220A6E20B8AEE4F7711CB 97207~|~1~|~1~|~01/NFP~|~Culvert replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~898A2273E417B91381901B7D3688F1C19EBE4FE4 99435~|~1~|~1~|~01/NHS~|~90% federal w/10% local matching funds for HSIP eligible work.~|~21 - Safety~|~CD92A12656F4512AD5A0E00C1CDBB45386B2CDB0 109129~|~1~|~1~|~01/SAF~|~Convert TWSC intersection into a single-lane roundabout.~|~21 - Safety~|~54676A6A50853B05A05C9FCD6F8ABD3E2D804ED8 109129~|~1~|~2~|~02/SAF~|~Project Work Items at 100% City Cost that are not Project Eligible.~|~21 - Safety~|~E817DF7D7C491F6F637F073C506711242CB6BA6F 99654~|~1~|~1~|~01/SAF~|~Install Smart Micro in City of Elyria.LOR-20-16.93 to 19.40LOR-57-16.17 to 18.86 (excludes the SR57/US20/Cleveland St Intersection)~|~21 - Safety~|~82784D6C8697FB6685B092AF6B3DD2773ED34D15 99654~|~1~|~2~|~02/STR~|~-Overhead flasher removals, LED stop signs - Various locations-Signal head replacements ERI-4-8.86 and Strub Rd / WAY-21-5.85 and Eastern Rd-Overhead flasher beacon replacements - Various locations.~|~44 - Other~|~F40B94D6B6AA5FC982B82B21CE63223AD1AE3FCC 99654~|~1~|~3~|~03/STR~|~-RIC US42 13.00 and Grace St. - Signal Cable Replacement-ERI US 0250 02.10 and Strub Rd / ERI-4-8.86 and Strub Rd - UPS Battery Backup Replacements-Traffic Signal and Overhead Flasher Relamping - 65 locations~|~44 - Other~|~21AC73B4188644B701A288A16899B68F7E06037E 101873~|~1~|~1~|~01/IMS~|~LOR 90 Gap~|~05 - 4R Maintenance - Resurfacing~|~08FC66E44220982DE41F16D90A91DEE052D6D644 121360~|~1~|~1~|~01/SAF~|~Lighting repairs and upgrades~|~21 - Safety~|~2A85B7D202E3B86A5D5C8C63C928BFDC4B5C0EF3 122458~|~1~|~1~|~01/NHS~|~PROTECT bridge carrying SR 7 over Glenn's Run (formally known as Nixon Run) by placing Rock Channel Protection along both abutments.~|~66 - Resilience Improvement - Highway Project ~|~A82FAE6861A5B4447E44DBD56EC3629E8BF1B56C 121999~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~ECC219788720D90F53F454A4E1AA45B35324B9B3 102669~|~1~|~1~|~01/STR~|~This is the only plan split. Uses 80% federal and 20% state funds from the district preservation program; SACs 4PF7 and 4PS7. SFN for existing bridge is 2001950.~|~10 - Bridge Replacement~|~F38F1EB660D42F55E102E7E774D8E7C3AC04885A 102458~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7~|~05 - 4R Maintenance - Resurfacing~|~C943A5ECA06B2A3662EFF54C6AF046AF4C9C3ADB 110005~|~1~|~1~|~01/NFP~|~Pruning~|~44 - Other~|~CC87374230D8D55DD748E975706AEAD35627B78A 123627~|~1~|~1~|~01/STR~|~Plan Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~C30BF9B949E2AEF668F0BAD878F31E5FBE4B3CC0 108330~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. NOB 78 2.10. DSR NOB-005. Rural other federal aid funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~11A4A760341464623EDB07B3F14A65C17A2B7206 95299~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB CR 15 0.04, SFN 6132111. Funded by the Ohio Bridge Partnership Program 100% federal.~|~10 - Bridge Replacement~|~00EBA9C6D81AC54FC49833DAECCDBA74D831D2CC 83050~|~1~|~3~|~03/STR~|~?Drainage improvements to include addition of catch basin @ slm 7.078 together with 12? pipe, and concrete curb and gutter to be placed under and along existing guardrail.? 03/STR/OTH/State~|~05 - 4R Maintenance - Resurfacing~|~2FB5FC245BAC6588A341CC62D8DB8413F6475BEB 83050~|~1~|~1~|~01/S<2~|~ROS SR28 6.00 Resurfacing ProjectOn SR28 begin project 6.00 miles east of the Highland County line. ROS-SR-28 15.98 to 17.30 01/S<2/PV/State~|~05 - 4R Maintenance - Resurfacing~|~A13A385F2D38EEF5CE05D462A8FF6708AB40F97D 83050~|~1~|~2~|~02/STR~|~ROS SR28 & PIK/ROS 41 Resurfacing ProjectBegin project 6.00 miles east of the Highland County line. Pavement sections.ROS-SR-28 6.000 to 15.980PIK-SR-41 5.200 to 5.390ROS-SR-41 0.000 to 2.79 The following Brdgs are all pave thru.7101422 ROS SR28 8.78 Intersect: Stream7101457 ROS SR28 9.28 Intersect: Stream7102712 ROS SR41 1.11 Intersect: Massie Run7102747 ROS SR41 2.3 Intersect: StreamO2/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~EA6375C1406CB60BDF592BEB80ACFF6C294ADF9B 93538~|~1~|~1~|~01/AVN~|~Ssecurity gate upgrades - 100% state facility funding~|~~|~8E7820BA1DF2C0C17CFF33A2E380EA409633417A 113839~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~D2C336EC4E598410A4E4972F1823DBB3E24E5A9D 108896~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 218 11.66-16.46 and GAL 553 0.00-2.34. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~FAD0BAB3BCC0E1D97968FD7A5B380DC6D4F447E6 108896~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 218 16.46-17.14. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~3B3ABA92A0B61F419D496F0E2125F1478D24DC23 102334~|~1~|~1~|~01/NFA~|~Bridge rehab on local bridge.~|~13 - Bridge Rehabilitation~|~AA1A54FD4AF8F075D5931330F0979E8ADC5632FC 93256~|~1~|~1~|~01/IMS~|~Replace bridge deck and convert abutments to semi-intergral, patch piers with annodes, paint and seal structure SFN 7502435 SHE 75 1551~|~13 - Bridge Rehabilitation~|~20D49066706045241056BA9CE68119BA38FA3B1B 76340~|~1~|~1~|~01/STR~|~SFN# 7605765, STA SR183-23.51 over Deer Creek.~|~13 - Bridge Rehabilitation~|~8725FB763149CE86A9CC5594AD1209B6E5BE1B70 76340~|~2~|~2~|~02/NHS~|~SFN# 7602944 STA-US 62-35.77 Over Norfolk Southern RR, SFN# 7602448 STA-US 62T-1.38 L over Freshley Avenue, SFN# 7602456 STA-US 62T-1.38 R over Freshley Avenue, SFN# 7602472 STA-US 62T-2.37 under Beeson Street, SFN# 7602480 STA-US 62T-2.90 under Vine Street, SFN# 7602537 STA-US 62T-3.63 under Klinger Ave, SFN# 7602413 STA-US 62T-4.12 L over Rockhill Ave, SFN# 7602596 STA-US 62T-4.12 R over Rockhill Ave, SFN# 7605943 STA-SR 225-0.70 over Mahoning River, SFN# 7602855 STA-SR 173-4.47 over US 62T~|~13 - Bridge Rehabilitation~|~ECAAFDB10CE22F7726B9E7698951B4D06F371845 119976~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~741A51289C90086361A3DBDE8DA62FAD00A908D9 122475~|~1~|~1~|~01/NHS~|~Type 2 emergency.~|~47 - Bridge Preventive Maintenance~|~26543AF02AE35E18D62C856F8AC096053977B2B6 115567~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~24FED6B6B432D6F2E0EEA842B5CA9C075A644748 106907~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2023. Funded 100% state.~|~21 - Safety~|~83BC54C91286994CD60922F8E8F5C766DDA10972 111645~|~1~|~1~|~01/NHS~|~Signal upgrades on STA SR 241 at SR 687.~|~21 - Safety~|~DEDA97CADC13544D2F4C8C2630A9D4EFC1C2C609 111645~|~1~|~2~|~02/S>2~|~Signal upgrades on STA US 62 at Broadway and TRU SR 193 from Colonial Dr to SR 304.~|~21 - Safety~|~3A0A89E6A553F3799101E5F16484405962454F65 111645~|~1~|~3~|~03/S>2/LOUI~|~Signal upgrades at STA SR 153/Constitution Ave with programmable and supplemental signal heads and controller update to avoid yellow ball trap along with installing thermoplastic pavement markings.~|~22 - Rail/Highway crossing~|~0BF2ECC4A22B1AAE82EDE11CDF5318FE90E70678 95854~|~1~|~1~|~01/NFP~|~Culverts @ SLM 17.12 and at SLM 17.13~|~~|~1F1652D7648D210842AAE71FD18FE7FA1F470B01 103079~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 145 9.28~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE239D6CCECD5BE4B5484F72E3BF572AF1A207DE 98521~|~1~|~1~|~01/BRO~|~District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~EB173BA5606A554270E9D61FDB118CBBB666E21A 106308~|~1~|~1~|~01/NFP~|~Installing raised pavement markings on various routes throughout District 4.~|~21 - Safety~|~0CF8B8478B4E3E161DEA240E0DB3460C617E794A 118179~|~1~|~1~|~01/SAF~|~All items associated with the safety improvement.~|~21 - Safety~|~AD4E2644966A3C856744758342D24399ECD6A0D3 105555~|~1~|~1~|~01/SAF~|~Lighting.~|~21 - Safety~|~B3E156D8E4FD8FE33EF138D382498D4573ACDE3D 80020~|~1~|~2~|~02/STR~|~ROS US23 0.00 - 4.63 & PIK US23 15.84 - 16.28Bridges for Rehab:6600816 PIK US23 15.97 Intersect: Trib Of Moores Run6600840 PIK US23 16.12 Intersect: Moore'S Run7100035 ROS US23 0.39 Intersect: Crooked Creek7100094 ROS US23 0.75 Intersect: Crooked Creek7100124 ROS US23 1.09 Intersect: Crooked Creek7100167 ROS US23 1.47 Intersect: George Hollow Run7100191 ROS US23 1.64 Intersect: Stream 80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~9198307C4BA11D93060F0D2288DE5320B1D429E8 80020~|~1~|~1~|~01/STR~|~ROS US23 0.00 & PIK US23 15.84 Resurfacing ProjectOn US23 in Ross (SLM 0.00 - 4.63) and Pike (SLM 15.84 - 16.28), beginning 0.16 mile north of the Norfolk & Southern RR overpass and ending 0.02 mile south of the TR1206, it is proposed to resurface a portion of US23.80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~BDABE2A822CA7E3D47A18A99A0D4B04181BCBDC0 102203~|~1~|~1~|~01/STR~|~LAW CR 4 4.96 ER slide repair.~|~~|~0717FE7073E8B26550569277ACF6820744F6B1A1 97854~|~1~|~1~|~01/NFA~|~Paving Petros Lake Park parking lot, striping and signage.~|~44 - Other~|~7A98DE9E38853EA7E351B37248260D52519731D4 81323~|~1~|~1~|~01/ENH~|~Bicycle/Pedstrian Trail - Federal Cap $292,500. Pri. 2 is for over Fed. Max. and is 100% Village of Marshallville~|~28 - Facilities for Pedestrians & Bicycles~|~7291645792352FFD500A900AD6D5DA1243CF1077 102970~|~1~|~1~|~01/STR~|~STP Rural SmoothSealCRA-4-11.26-22.20CRA-19-5.50-11.63CRA-97-1.96-3.63~|~05 - 4R Maintenance - Resurfacing~|~117E16C99E3C2C96A5FFE20747EE591731A7B942 102970~|~2~|~2~|~02/S<2~|~STP<200000 SmoothSealCRA-19-4.20-5.50CRA-19-11.63-12.06CRA-4-10.87-11.26~|~05 - 4R Maintenance - Resurfacing~|~EDBF31C8CD7C5B03170BB9221297ABACAF4ADA5E 102970~|~1~|~3~|~03/S<2~|~80/20 Fed/CitySplit Corp City of BucyrusCRA-4-10.87-11.12~|~05 - 4R Maintenance - Resurfacing~|~DCDE1AF2ABA948F4602FC52C35D22D01D8A29658 102970~|~1~|~4~|~04/S<2~|~100% CitySplit Corp City of BucyrusCRA-4-10.87-11.12~|~05 - 4R Maintenance - Resurfacing~|~2E4B0F9AEBCBF2BD2A4E70D902CD1A9A81860291 102970~|~1~|~5~|~05/STR~|~Bridge work on structures larger than 20'~|~13 - Bridge Rehabilitation~|~FCFB6C92C95632409A0E47C39E42A796FA65D266 102970~|~1~|~6~|~06/STR~|~Bridge work on structures less than 20'~|~05 - 4R Maintenance - Resurfacing~|~29F680176434D9824581B6FC8B1F7553A3AA404E 101993~|~1~|~1~|~01/NFP~|~Pavement Marking Work Order on various routes throughout District 4.~|~21 - Safety~|~DD4850859D113042AC6C7C270887F760B9DF5A8D 123687~|~1~|~1~|~01/IMS~|~plan split for the interstate locations~|~47 - Bridge Preventive Maintenance~|~FD08AD80EBEEF02D0CADA0913C1DE77D46CEDE5E 123687~|~1~|~2~|~02/NHS~|~Any bridges on NHS (not including interstate)~|~47 - Bridge Preventive Maintenance~|~29BE1DEA1E3BB3BDC036BF2E7E13ABC02799A9B4 123687~|~1~|~3~|~03/S>2~|~Bridges in Urban (>200k) areas that are not Interstate or NHS.~|~47 - Bridge Preventive Maintenance~|~08232F09EEA2A963E0B50A03747C2CF213CD3402 123687~|~1~|~4~|~04/STR~|~For rural bridges not on Interstate or NHS.~|~47 - Bridge Preventive Maintenance~|~B5CB9AAD7B04E8C8BB4AEE25F15A16D322E9F640 81706~|~1~|~1~|~01/BRO~|~Replace the bearings on the existing bridge (COL-154-1530, SFN 1503782), patch the deck and repair abutments and paint structural steel.~|~13 - Bridge Rehabilitation~|~A71BD8B0D95E5C04E14FC3C1858079E8E92A29E5 119763~|~1~|~1~|~01/S50~|~Asphalt resurfacing US 40, US 250 and SR 767 in Bridgeport~|~05 - 4R Maintenance - Resurfacing~|~668455E190D1D3B75BD2597AB1C886C76B55044A 119763~|~1~|~2~|~02/STR~|~Resurfacing SR 147 in Barnesville~|~05 - 4R Maintenance - Resurfacing~|~AD83C24243C0D3BD0CA25D2527AF7337317F884C 119763~|~1~|~3~|~03/NFA~|~Asphalt resurfacing at Barkcamp State Park for ODNR~|~05 - 4R Maintenance - Resurfacing~|~0526E95A8C35B278B018BC244BD3CCCF09459F9F 101750~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - Plan SPlit 1 for Gue-70-00.00 to 06.51~|~05 - 4R Maintenance - Resurfacing~|~D4491E1799D8F43CF7F76DBB915F1DCA6AA0A43F 101750~|~1~|~2~|~02/IMS~|~Reconstruction of IR 70 EB & WB Ramps to Salt Dome/Weigh Station~|~04 - Reconstruction - No Added Capacity~|~A6967A6BA95A4FB8485CCA80E5214070027B92DC 104761~|~1~|~1~|~01/NHS~|~Emergency bridge repair on NHS bridge.~|~13 - Bridge Rehabilitation~|~B5D4DC7482A255F8BEB8B21EF8C7480524E9E48E 117323~|~1~|~1~|~01/ENH~|~Gallia Freight Station Museum upgrade. Add fire sprinkler to station building, add security system to museum grounds and restore several railroad cars and locomotives for display. TAP funded 80% Federal/15% TRC/5% Local.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~A195EF5447DAFFE1CF4C83B70AB3AC7C7CDFDE7E 99778~|~1~|~1~|~01/IMS~|~Tree/Stump removal and pruning, removing ash trees in various locations throughout District 7~|~44 - Other~|~0B23D1DCBA187A07D78D72DC6A2BBA45C8704600 109156~|~1~|~3~|~03/NHS/Dela~|~This plan split covers any work that is 100% City of Delaware responsibility. It will include conduit within the City corp. limits as well as the bikepath overpass work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6786064C49A92BE83EA5D8E43819867FEAA68775 109156~|~1~|~1~|~01/NHS~|~Repairs and deck overlays on 6 bridges~|~47 - Bridge Preventive Maintenance~|~8A71D59CBF768DB6559A538409F479B333B30444 109156~|~1~|~2~|~02/NHS~|~Split for concrete repair along DEL-23 from SLM 10.63-10.81. Work also includes miscellaneous conduit work that is completely within ODOT jurisdiction. ~|~05 - 4R Maintenance - Resurfacing~|~AA551BC8BB698FDE8613B10F5D06040F81892CCE 109156~|~1~|~4~|~04/NHS/DEL~|~Miscellaneous drainage work. 50% covered by ODOT and 50% covered by City of Delaware.~|~04 - Reconstruction - No Added Capacity~|~4653D93FE082FF579E3EAC92412DADA6FDE4F0EC 109156~|~1~|~5~|~05/NHS~|~Repair or replace several conduits on US 23~|~04 - Reconstruction - No Added Capacity~|~9F0AF036D2B9BE580ACDBF39549EB7DC44A5E033 112552~|~1~|~1~|~01/BRO~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work.~|~47 - Bridge Preventive Maintenance~|~87A5CEF516E6BA5E72A004C290F9860E69A2A0FB 93120~|~1~|~1~|~01/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~D8A4A428AC5B07AC9D795EDBBB7D26757E3B24B0 102918~|~1~|~1~|~01/NFA~|~The city is proposing to reconstruct and widen approximately 4300 feet of Chester Road between the east Menard's /Cabela's property line east through Jaycox Road, in order to support the Bendix Corporation's new Corporate Campus development of north of Chester Road.~|~01 - New Construction~|~99B87DC3549EA9E07BEC40A4D6FEC23055ABA52A 84063~|~1~|~1~|~01/SAF~|~01/SAF/OT ; The split is for work eligible for the funding approved from the ODOT Safety Program. After the Safety Program cap is reached, District Preservation Program funds will be used.~|~21 - Safety~|~41037AAA65A36D3FA612B981703CF4540CFA18F5 104064~|~1~|~1~|~01/STR~|~Culvert replacement on ROS 28 7.99~|~04 - Reconstruction - No Added Capacity~|~13B36653BD82047741169D95B42E755861AF7E63 115173~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~D3C049F7BB7F21A40E24B5A813C1931F0C2DFC52 98471~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~06B4F5C2BF0940E9646A8B50395654474F5A3536 102866~|~1~|~1~|~01/IMS~|~Resurfacing Interstate route with asphalt~|~05 - 4R Maintenance - Resurfacing~|~A5BBFD7FC203950E2E2B75B5B2FE84DC855A4AEC 102866~|~1~|~2~|~02/NHS~|~Resurfacing NHS routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~4F8195E06D7F00A9EE84218CCEB28B56880E98A3 102866~|~1~|~3~|~03/STR~|~Resurfacing STP Rural routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~E286BA52639E3A6FA9FB5DF8F6758D712AAB3682 102866~|~1~|~4~|~04/S>2~|~Resurfacing STP > 200k routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~B8393144DD194F4AD26CF7C1E38D3DA9EC1BE4CC 109930~|~1~|~1~|~01/NHS~|~District Preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~F85BC8C1F44EA1E9D1FBCF1EBA8B196CD5A66054 94376~|~1~|~1~|~01/ENH/GIRD~|~Landscaping and signing enhancement of TRU-IR80 at US-422 in the City of Girard, Trumbull County, Ohio.~|~31 - Landscaping & Other Scenic Beautification~|~759D2A9694AACD153EFAC3E7F9F0C5159CF52EE5 97279~|~1~|~1~|~01/SAF~|~Intersections of SR-795 and Clark~|~21 - Safety~|~09491023B2A20CBDF4253EB3E936C94327AF5E03 97279~|~2~|~3~|~03/IMS~|~improvements at I-75/SR-795~|~21 - Safety~|~370179D5853FEA6F810823C5E11845527AAFBF97 97279~|~1~|~2~|~02/SAF~|~Intersection of SR-25 & Five Point Rd~|~21 - Safety~|~805D18BB00ED2BDDAF07347B5CF561A5948BCFA0 112724~|~1~|~1~|~01/NHS~|~Overlay and paint FRA-3-17.44 (over I71)~|~13 - Bridge Rehabilitation~|~7AD7622D6D31B888CFA715F7D9CD22E6AD2E9C7F 119707~|~1~|~1~|~01/S>2/PATA~|~Replacement of SFN 4563743~|~10 - Bridge Replacement~|~97F623602E0505E669A03BFBFCB07CDE74E9F515 102927~|~1~|~1~|~01/MPO~|~Bridge maintenance on MPO bridges~|~~|~6EED144F0FA54223621E029FC0F3C0B244AF947E 102927~|~1~|~2~|~02/IMS~|~Plan split covers bridge rehab work on IR 70 & IR 71.~|~~|~C9E6A79AFB1D22CACBE1540935B0BC3F4346E9A1 122448~|~1~|~1~|~01/STR~|~Plan split for slope repair work on HEN-108~|~66 - Resilience Improvement - Highway Project ~|~CA01165DA8969D646C3B0D87AF3AF37DEB62041C 123662~|~1~|~1~|~01/S>2~|~plan split for bridge work on the HAM-22-0446 bridge~|~13 - Bridge Rehabilitation~|~68F0BF1CAE59072193EB37F5B94BAEA0F9E2BC6D 102016~|~1~|~1~|~01/S<2~|~Geological Site Management Funding - 4SF7 (80% Federal)/4SS7 (20% State) - See CAP Comment - Rock scaling and rock bolting on MUS US 22 from 5.25 to 5.36.~|~21 - Safety~|~D5B5879F09B2413CA12C0108146F2FC37E9BA57C 90238~|~1~|~1~|~01/NFA~|~Storm Sewer Repair~|~44 - Other~|~AFC82D2833F7A1E51B0EAB000611410353263223 120200~|~1~|~2~|~02/ENH~|~Sidewalk installation to enhance pedestrian mobility.~|~28 - Facilities for Pedestrians & Bicycles~|~D7F17B335CCEADEFE012882D389006AACECF2DA8 120200~|~1~|~1~|~01/S5K~|~Reconstruction and roadway profile work.~|~04 - Reconstruction - No Added Capacity~|~A3A1B90F044E62F146C090850928DF0D32AE3E5F 89307~|~1~|~1~|~01/MPO~|~ Project will make improvements to the SR-129 off-ramps, add and lengthen turn lanes at multiple intersections, add additional through-lanes on Cincinnati-Dayton Road from Liberty Centre Drive to Liberty One Drive, and will replace the traffic signals at all currently signalized intersections within the project limits with mast-arm mounted traffic signals.~|~04 - Reconstruction - No Added Capacity~|~2FCEE516F6635E776C4CB75AD6D4245A1A7FD2CB 127186~|~1~|~1~|~01/STR~|~Pavement marking on various County Routes~|~21 - Safety~|~7E5307B20F84496195DDA6ED4807A5CEE45678FD 92348~|~1~|~1~|~01/BRO~|~4805917 LUC SR65 5.35 Intersect: Maumee R Csx Rr Summit~|~44 - Other~|~196CF4FF43160BE467A828724630BB79945A8731 114619~|~1~|~1~|~01/STR~|~Overlay in LAW.~|~05 - 4R Maintenance - Resurfacing~|~4348E2029CA435AFA1A3B657DD12F127EEF18790 93823~|~1~|~1~|~01/ENH~|~Construction of multi-use trail for pedestrians and bicycle access between Hiram College and State Route 305 in the Village of Hiram. Provide parking access and bike racks (trailheads) at various locations.~|~28 - Facilities for Pedestrians & Bicycles~|~FDAB5D8D55D3E33061FD8B5878E22567A7A87EEF 95138~|~1~|~2~|~02/NHS~|~Culvert replacement project. NHS route funded 80 federal/20 state. Locations: MOE-7-1.75, MOE-7-15.40, MOE-7-16.40, and MOE-7-18.20.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~550DC38B055A13AC1B40072A46BAE0B036921528 95138~|~1~|~1~|~01/STR~|~Culvert replacement projects. Other federal aid funded 80 federal/20 state. Locations: MOE-26-1.21, MOE-78-11.45, MOE-145-9.38, MOE-556-12.94, and WAS-26-4.36.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~82FA5F146E789881FFF5C9932DF66073BE280FED 108110~|~1~|~1~|~01/MPO~|~Resurfacing on local route in the City of Clayton.~|~05 - 4R Maintenance - Resurfacing~|~EC0EE423BEC5E48C1E4D57599182567CAE7BD0A7 101644~|~1~|~1~|~01/NFA~|~Emergency project to replace a bridge destroyed by flooding. GAL TR 664 0.01, SFN 2735326. Not on any federal aid system funded 95 federal/5 local.~|~10 - Bridge Replacement~|~519AC111BFCEF797D7760F027B0D0B362AFF58D6 117718~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 537 1.64, SFN 5602947.~|~10 - Bridge Replacement~|~824723FD775C6A0442BC7CFB205EBACD61984DE7 125645~|~1~|~1~|~01/SAF~|~Safety plan split for curve and intersection realignment~|~21 - Safety~|~387F7CE512AC8C3BF8ABF3899D94579B6C2EBF98 102880~|~1~|~1~|~01/STR~|~STP pavement, excluding Montpelier from 10.320-10.800~|~05 - 4R Maintenance - Resurfacing~|~1DF3A81FFBD8017840A1419377F8AEFC475E7B78 102880~|~2~|~2~|~02/STR~|~ODOT-funded resurfacing from Part 2, Montpelier from 10.320-10.800~|~05 - 4R Maintenance - Resurfacing~|~78E65A55806EE28AEACEE156D52E2BC0D2A3AA8E 102880~|~2~|~3~|~03/STR~|~Village-funded curb and gutter replacement from Part 2, Montpelier from 10.320-10.800~|~05 - 4R Maintenance - Resurfacing~|~4F63F5865222299354041AAC5BE9DBD8F680EB87 112640~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE CR 12 18.00, SFN 5630568. Work includes approach repairs and guardrail installation. Ohio Bridge Partnership Program. Funded 100% Federal.~|~10 - Bridge Replacement~|~09779573B76E41888773CFC5BB7D9E5CED6AE2EE 88631~|~1~|~1~|~01/STR~|~MRW-314 from 0.00-3.85 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A9A5B03E73CD9051B35994328EE22D38CBCB6829 121188~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~9343BE540C0E174C4CDDB7F934C9E75F810E3857 121188~|~1~|~2~|~02/SAF~|~Construct sidewalks and pedestrian crosswalk RRFB's in the village of Cardington~|~28 - Facilities for Pedestrians & Bicycles~|~E6DB705F8BD460BDD408E0FAAF529EBB017AF359 121188~|~1~|~3~|~03/STR/Card~|~Items of work to be paid 100% by the Village of Cardington~|~05 - 4R Maintenance - Resurfacing~|~45D408E1F78430C769FE13E59A0A4C108B2814BB 120435~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State~|~21 - Safety~|~FF5BE9F3516E1F8D6B9777564EF1D0993AC685C0 22523~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using Mill and Fill process. WAS 7 10.12-14.05. Federal 80% and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~4041A00F6221909FF1D9676FDFD85BBBE9A01B86 116110~|~1~|~1~|~01/S<2~|~Urban Paving project to resurface SR-18 and SR-231 in Tiffin.~|~05 - 4R Maintenance - Resurfacing~|~EABA79C1B504AE17FFE0D537E1B22C5531BF270F 116110~|~1~|~2~|~02/S<2~|~This split is for urban paving non-eligible items (full depth pavement repairs, curb, curb ramps, sidewalks,... )~|~05 - 4R Maintenance - Resurfacing~|~8ECDAF95C16C568FAEC4FD0ED069B313D8A2B669 91994~|~1~|~1~|~01/STR~|~JAC SR233 0.00 - 4.37 resurfacing projectOn SR233, being project within corp limit of Oak Hill @ SR93 (SLM 0.00), head east and terminate at Galia Co. Line (SLM 4.37), it is proposed to resurface the highway with asphalt concrete.Pave Thru Brdg:4002938 JAC SR233 2.79 Intersect: Dicks Creek80/20 split~|~05 - 4R Maintenance - Resurfacing~|~352BA370757E033114BCB9D876648D47F999603B 121735~|~1~|~1~|~01/BRO~|~preventative maintenance work on (SFN 3136337) Hopple Street Bridge.~|~47 - Bridge Preventive Maintenance~|~AA1A4D7B867C65B5733F25D8CD398489DEEBD653 126934~|~1~|~1~|~01/STR~|~Safety project to construct a single-lane roundabout at US 62 (Johnstown Utica Rd) and SR 657 (Marion Rd NW) in Licking County.~|~21 - Safety~|~814F714C2D6072474AC131753BFDC09EE08C20B5 84204~|~1~|~1~|~01/NFP~|~Districtwide Herbicidal Spraying Contract.~|~17 - Construction Engineering~|~80915915DF38A2C094A3BAC6BACF6D65271D89D0 126025~|~1~|~1~|~01/NHS~|~Establish Funding~|~05 - 4R Maintenance - Resurfacing~|~0FB90BA9349338EE252A993FC46A684467B4E11F 97586~|~1~|~1~|~01/SAE~|~Pavement marking on various county routes with 100% CEAO Safety funding (4HB7).~|~21 - Safety~|~46053A6F777A64686B1C9A36955AD9AF2088C078 97586~|~1~|~2~|~02/SAF~|~Pavement marking on various county routes with 100% Local funds over the $150,000 CEAO Safety funding (4HB7) cap.~|~21 - Safety~|~8366DFA46B67174F9B8204F091E15C8F096A8234 114462~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 2.55 to SLM 12.12~|~05 - 4R Maintenance - Resurfacing~|~A52E62A31C7A35AA776117A4FF2CB50789D9D0A6 114462~|~1~|~2~|~02/S<2~|~Resurfacing SR 9 from SLM 12.12 to SR 45~|~05 - 4R Maintenance - Resurfacing~|~6700E35D30D77F31EB2F62E0A0DCA9592C606396 125522~|~1~|~4~|~04/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FF81EE68E0BB3FFDA81839081B805B1D7D221AF5 125522~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2EB43C7EE05B9D5C2AF4208D5FD9AE7D3721F84D 125522~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8CE80F328D5DBBA88987CE55E1DAB23E806A0913 125522~|~1~|~3~|~03/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0C8EAD9340C47823779B1397A40A0B0B8D86E3A3 99084~|~1~|~1~|~01/IMS~|~Plan split for construction~|~47 - Bridge Preventive Maintenance~|~B63ADAEF2EC11DE197EA845746185B28E3B87BD0 123775~|~1~|~1~|~01/IMS~|~ALL ITEMS OF WORK ON DEL-71 AND ASSOCIATED RAMPS.~|~21 - Safety~|~0BB86070D421DA4E379D988CBA8D3315829609EF 123775~|~1~|~2~|~02/NHS~|~ALL ITEMS OF WORK ON DEL-23; DEL-36 10.373-21.727; DEL-42 0.000-7.273; UNI-33; UNI-36 1.755-9.638; UNI-42; AND UNI-4 0.000-2.566.~|~21 - Safety~|~F1F2A4964176DAE5F9357232DE6B2C786481BA29 123775~|~1~|~3~|~03/S>2~|~ALL ITEMS OF WORK ON DEL-36 6.929-10.373; DEL-42 7.273-7.295, 8.183-8.569, 8.767-13.250; AND UNI-CR24 WITHIN THE COLUMBUS URBAN AREA.~|~21 - Safety~|~0265C1B6940AEC4620F9C532C28C65DC91E6B899 123775~|~1~|~6~|~06/NFA~|~ALL ITEMS OF WORK ON UNI-287 0.000-0.721.~|~21 - Safety~|~B0FF3C912CC060AB6D83964D8DCBA56E16642994 123775~|~1~|~4~|~04/S5K~|~ALL ITEMS OF WORK ON DEL-36 21.727-22.837; UNI-33I; UNI-36 9.638-9.801, 13.039-15.554; UNI-4 12.709-15.951; UNI-MR803; UNI-31; UNI-245; AND ASSOCIATED RAMPS WITHIN STP 5,000 TO 49,999 URBAN AREA.~|~21 - Safety~|~025200B162C90D1A119F754D6665D6C4EE8B931A 123775~|~1~|~5~|~05/STR~|~ALL ITEMS OF WORK ON DEL-36 0.000-6.929, 22.837-28.600; DEL-42 13.250-19.154; UNI-36 0.000-1.755, 15.554-18.929; UNI-4 15.951-26.261; UNI-287 0.721-1.151; UNI-347; UNI-739; AND UNI-739I NOT LOCATED WITHIN AN URBAN BOUNDARY.~|~21 - Safety~|~A77AECE2EC7D5354AC3BB4710CCB40DF36EDFD88 90787~|~1~|~1~|~01/MPO~|~Constructing bike lanes on Broadway Street from West Third Street to Harvard Boulevard and creating a bike boulevard through the Five Oaks neighborhood on Harvard Boulevard, Richmond Avenue and Homewood Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~1C8F59426B2311805B835C24E3410A1D5D1CF781 109426~|~1~|~1~|~01/SAE~|~Upgrading/Replacing pavement markings eligible for federal-aid~|~21 - Safety~|~42E4C9326D5698CC46BD47516FBEDD636D4EC2A7 109426~|~1~|~2~|~02/NFA~|~Upgrading/Replacing pavement markings not eligible for federal aid~|~21 - Safety~|~62338515EFB71E704056F976FA9B944C1C6C445C 121355~|~1~|~1~|~01/IMS~|~Funding split for bridges associated with the interstate.~|~47 - Bridge Preventive Maintenance~|~C560CF9E29E1F22EB9A6AC130F16D96BAC96C3D1 121355~|~1~|~2~|~02/NHS~|~Plan split for NHS bridges.~|~47 - Bridge Preventive Maintenance~|~43F607A5BC3ACF17F3C581E1DBA8BAA596E28937 99199~|~1~|~1~|~01/NFA~|~Build new Logan County Lakeview Outpost facility~|~44 - Other~|~EE1B3E144A04114BFE0EF801F853DEE32219074E 92353~|~1~|~1~|~01/STR~|~Rural route. GSMP funds. Failed rock embankment. layback slopes to mitigate rockfall.~|~04 - Reconstruction - No Added Capacity~|~14C6BEC3670BCFEAE86F6E02CA8E94E78BE43AB1 103712~|~1~|~1~|~01/IMS~|~Brent Spence Bridge: Painting Structural Steel Approach Spans: Painting Structural Steel~|~47 - Bridge Preventive Maintenance~|~96BF19AE5FB537427CF1D3DF3762C6A279091728 94179~|~1~|~1~|~01/STR~|~Minor invert pavement work to bridge size culverts on rural routes.~|~13 - Bridge Rehabilitation~|~7671136B4429EEC61D6CD8CEF85034BEFEF17526 94179~|~1~|~2~|~02/S<2~|~minor invert paving to bridge size culverts on STP <200000 routes.~|~47 - Bridge Preventive Maintenance~|~DCC5B47C89FBEF303AB84BFF32F78FEC90D83798 94179~|~1~|~3~|~03/NHS~|~minor invert paving work to bridge culverts on NHS routes.~|~47 - Bridge Preventive Maintenance~|~552FB9BC55CBF2BC3AFC15617BFD5DC0A56C16CF 94179~|~1~|~4~|~04/STR~|~Minor invert paving on Federal size bridge/culverts on rural routes.~|~47 - Bridge Preventive Maintenance~|~4A4ADA9F453D0D9AC0F48E927DAA0B0FB80EAD9D 96519~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~D1B9AA6FB07F1EAA95F76CD65B56C2B8100E3016 96519~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~8BCEE10914DED1186647DD199E37D04CD074D620 96519~|~1~|~1~|~01/IMS~|~Resurfacing of TRU IR 80 from 8.56 to 12.33.~|~05 - 4R Maintenance - Resurfacing~|~0858CD371CFD8603E299D1C38219BC11D5BC1776 96519~|~2~|~5~|~05/IMS~|~Slope repair on TRU-IR80-10.99 (Westbound)~|~04 - Reconstruction - No Added Capacity~|~977571072A26984948DDE458FD9419ED503143AA 96519~|~1~|~4~|~04/IMS~|~Removal of existing structure and leaving abutments.~|~10 - Bridge Replacement~|~4465ED8191362BACDB42AB68FD8990801A705869 92412~|~1~|~1~|~01/ENH/MTVE~|~"01/ENH/OT/MTVE" - Enhancement Funding 4B37(80% Federal) / 4BG7(20% Local) - CAP of $670,000.00 for 80% Federal Share - Enhancement project to construct a bike trail in Mt Vernon connecting two former railroad bridges converted to bike crossings.~|~28 - Facilities for Pedestrians & Bicycles~|~233BF205AD18D449E1B5B39160E7FF52EB0B72F7 116702~|~1~|~1~|~01/S5K~|~Circleville Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~77AC44B0AA180E6B5E44FD19A3760C77544894F3 116702~|~1~|~2~|~02/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~5F1AE059A0CA47F8E06F05B0A913A3A617B668F7 112953~|~1~|~1~|~01/STR~|~SCI 348 12.80-18.69~|~05 - 4R Maintenance - Resurfacing~|~19146F669A5CD7C79B409FD1739AB1378D5B0067 126190~|~1~|~1~|~01/STR~|~Rural~|~05 - 4R Maintenance - Resurfacing~|~1C5731A0EC050C13C75F27CC52814FCC08C53D86 100229~|~1~|~1~|~01/NFA~|~HAR City of Kenton - International Paper~|~03 - Reconstruction - Added Capacity~|~8B50A8BFC8089F20F13BF64A2C08FAE91F3E6269 95496~|~1~|~1~|~01/CMQ/LIMA~|~Work to install sidewalks down both sides of Cable Road. 80% Federal MPO-CMAQ funds with the 20% match provided by the City of Lima. The CMAQ Eligibility was approved in an April 14, 2014 letter.~|~28 - Facilities for Pedestrians & Bicycles~|~A0CD96EE9E25C17DEB0CD729209A61169517F840 90940~|~1~|~1~|~01/S<2~|~Bridge Deck Replacement (District Allocation) - SFN 7007299~|~13 - Bridge Rehabilitation~|~E397F892E4DDBE0927E02BCD922F6696C7F790A8 99190~|~1~|~1~|~01/SAF~|~ADA VAR CR Guardrail~|~21 - Safety~|~558954D1CA455465DCFE949AAFE2F169213BB114 110120~|~1~|~1~|~01/STR~|~Culvert Replacement Plan split~|~04 - Reconstruction - No Added Capacity~|~3D7B3C6F5895CA76BB7DC0A0317130CD9404D62C 120142~|~1~|~1~|~01/MPO~|~installation of electric vehicle charging infrastructure in OTR and CBD parking garage~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~30F990DE3ABD4FB4A8DFCD0AFFF71AC45C685085 117479~|~1~|~1~|~01/ENH~|~Sidewalk installation~|~28 - Facilities for Pedestrians & Bicycles~|~3D0A5052482E1B55ED3482AD886A5FB7AD888DAC 118051~|~1~|~1~|~01/SAE~|~Install median cable barrier on I-275 from Blue Rock Rd to US-27.~|~21 - Safety~|~0F4DF922E238186B168D9E003985B7D58A5FA1BF 107669~|~1~|~1~|~01/STR~|~Resurfacing on SR 199 using district preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~07E6F936CF30951475BB47BFA5F177DCE920C7B2 95513~|~1~|~2~|~02/STR~|~"02/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Fai-USR 22-18.08 to 26.07; 2) Per-USR 22-00.00 to 06.77~|~05 - 4R Maintenance - Resurfacing~|~B45487F73C9BDFCA2183E064311F5F97C025C4F9 95513~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Fai-USR 22-18.05 to 18.08~|~~|~CA9F880DFF6E2CB1245FAC67D23C7BAC4EDEEB3F 107170~|~1~|~1~|~01/NHS~|~Bridge concrete deck overlay. ATH US 33 13.09 L (SFN 0505781) and R (SFN 0505803). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~D66E34A8592F7FC808D28251739D64AF44CBCFA2 80822~|~1~|~1~|~01/IMS~|~100% state funding for all work using state noise wall program funds.~|~44 - Other~|~DB8E15463E0349CD1BC2C5BD800917E1DA632D14 93228~|~1~|~1~|~01/S<2~|~GAL 160 0.90, storm sewer replacement. Improve highway drainage. Also to include berm reshaping and ditch cleanout. Urban federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AD1E49ABDB461356F66FE14A8FA470EB08EF0C58 122022~|~1~|~1~|~01/NFP~|~Landscape maintenance at various interchanges.~|~99 - State Preventative Maintenance~|~7CD26F3BE7BD424560580D467ACA6C9DCD11CC5A 113851~|~1~|~1~|~01/MPO~|~Replacement of sidewalk and curbs on both sides of Colerain Avenue (US 27) from Jonrose to Shadycrest.~|~28 - Facilities for Pedestrians & Bicycles~|~688C98EB198284B7ADC24AA237AC9670AA7228B6 104937~|~1~|~1~|~01/ERD~|~Construction of bikeways using TIGER funds.~|~28 - Facilities for Pedestrians & Bicycles~|~45841B0096DDAF75216EA1B6A952C76B88A8FF0D 124271~|~1~|~1~|~01/NFA~|~All work included in this plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~CD70520FA37791127A7FCD9547A5EE029FCC3947 113662~|~1~|~1~|~01/SAF~|~Construct roundabout at DEL-315/Hyatts Rd intersection~|~21 - Safety~|~8EEABED5FD6A89B1EA497A4EF487358FA43349B6 113662~|~1~|~2~|~02/STR~|~Replace culvert at intersection~|~04 - Reconstruction - No Added Capacity~|~AF87F2F9E7DB7160A16357494CD5A977073CB1BD 104422~|~2~|~2~|~02/NHS~|~Added Plan split 2 for Luc CR 508 resurfacing - Front St~|~05 - 4R Maintenance - Resurfacing~|~BFEED5719106F2F6D0777F65E32424DBE421D34C 104422~|~1~|~1~|~01/NHS~|~plan split for Luc CR 509 - Millard Ave Roundabout construction~|~04 - Reconstruction - No Added Capacity~|~0FA548E16C87A7022BE339F7FC62F91231F77794 122139~|~1~|~1~|~01/NFP/AKRO~|~Installing raised crosswalks, signage, pavement markings and new curb ramps in various locations city wide.~|~28 - Facilities for Pedestrians & Bicycles~|~DC3FCEFAD16EE813EA694B3962AABF584EB20644 101281~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~772B150E72AF30BE04BAEE8FF23D60053E522B11 101281~|~1~|~2~|~02/STR~|~STP rural Bridges~|~13 - Bridge Rehabilitation~|~1BBBD66D55A69F33033C038975F59AEEA6CAADB7 117607~|~1~|~1~|~01/NHS~|~Provide walls adjacent to SR 161~|~20 - Environmental Only~|~8A96FD2B4DD8EBCAC752A96CC011F88224D5AD65 76415~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-SR 16-02.63 to 11.22~|~~|~4E6CC9EAD45C3DB5A922FB4BE59CF5402A188239 126059~|~1~|~1~|~01/NFA~|~not fed aid~|~05 - 4R Maintenance - Resurfacing~|~5C21E107334458ADF637FFD7081BBBACE8350854 126059~|~1~|~2~|~02/STR~|~STP Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~7517938A5753A70645DEF9678DD3918F9A3DDF99 94315~|~1~|~1~|~01/NFP~|~ODNR project for Veto Lake Wildlife Area. Culvert replacement. Funded 100% state.~|~44 - Other~|~EE75367CDE29C7C831FB76E7A5B7BB7241D76D1A 123035~|~1~|~1~|~01/NFP~|~Task order PID for CE/INS~|~17 - Construction Engineering~|~E672C922B6D0D2EF45740DE0189BDDA5B9987C7D 100078~|~1~|~1~|~01/NFP~|~Reactive rear expansion joint repair of the IR-90 bridges over the Grand River~|~13 - Bridge Rehabilitation~|~3E62E544C9A645E986047C7A1F467C9DA19C9E60 105216~|~1~|~2~|~02/S>2~|~plan Split for work on HAM-747~|~05 - 4R Maintenance - Resurfacing~|~A5E1C0831E17A3BEA976550F6E153FA1391E328A 105216~|~1~|~1~|~01/NHS~|~Plan split for all work on the NHS routes: HAM SR 4~|~05 - 4R Maintenance - Resurfacing~|~2480FEAD9C0B293D28F124AA189D471EC25899F7 102891~|~1~|~1~|~01/SAE~|~Guardrail installation/upgrade on County Roads.~|~21 - Safety~|~D210891B3CD1F5DF64BCF72E1A5485274A9D5013 102891~|~1~|~2~|~02/SAF~|~100% local items~|~21 - Safety~|~B9A3EEF3E8946FAE791F4D259C972849DAC64011 125745~|~1~|~1~|~01/NHS~|~ATH US 33 Pavement Maintenance~|~05 - 4R Maintenance - Resurfacing~|~FA8ABF28719F5465F6A372A70B44D419D1D7684D 110892~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix on: MIA-55 SLM 11.03 to 11.62~|~05 - 4R Maintenance - Resurfacing~|~4A9A620A0853FBA67BCB4E448465C2C2B2093C2F 127152~|~1~|~1~|~01/NFA~|~Created for J&C Involvement.~|~44 - Other~|~F118B5F9450378C38E2449C03D2C3B86B71144C7 114923~|~1~|~1~|~01/IMS~|~Concrete pavement repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F3629CFDEDF5A0ED23FF838B707C921B55281509 114923~|~1~|~2~|~02/NHS~|~Concrete pavement repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~59032FD531248E3F17E28EA00F7F48981D2E50EF 114923~|~1~|~3~|~03/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~AEC76F3E107E15FCCCB493E35F8EC79B30C7FC40 114923~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~D5CAB2B13552FE9F01ECE2B7EB6B7140EE6593D4 114923~|~1~|~4~|~04/IMS~|~Bridge preventive maintenance 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~EA4983F8E77E70483BBBB7A6C8DDB7C2AC376FEB 118502~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~08AED39D0DECDE0234CE28A5522E888FA2A992DE 99991~|~1~|~1~|~01/BRO~|~SFN 6201202~|~10 - Bridge Replacement~|~C9BFE5E57D353652E8BBF7549495CF760BC0D7F3 105274~|~1~|~2~|~02/STR~|~Resurfacing of HAS-9~|~05 - 4R Maintenance - Resurfacing~|~8ABB08FB27C28EC0BDE1674EE0053589574309F7 105274~|~1~|~1~|~01/NHS~|~HAS-9 SLM 17.22 to 18.39~|~05 - 4R Maintenance - Resurfacing~|~D6D340EE8511C3C4670EA285D676DB93784053B2 101296~|~1~|~1~|~01/STR~|~Plan split for resurfacing of WOO-163 from 0.00 to 4.84~|~05 - 4R Maintenance - Resurfacing~|~1836419B1025438572D52C2A4477BC4508F04EAB 124943~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funds~|~05 - 4R Maintenance - Resurfacing~|~F37945B6E6CD39E3D2CA4F9C3457C0316C8F590D 122192~|~1~|~1~|~01/BRF~|~Plan Split for Bridge Replacement~|~13 - Bridge Rehabilitation~|~BC22206A7EFD1B1AA53CDD5E395BDD4D190DDC47 84899~|~1~|~1~|~01/BRF~|~This plan split for a bridge replacement on a non federal aid route.~|~10 - Bridge Replacement~|~18EF5A28B7A843C0C83F807A0884FE3D6BD289EF 123936~|~1~|~1~|~01/NHS~|~Plan split for slide repair~|~04 - Reconstruction - No Added Capacity~|~434EC850BCB708E19BEA4A129FC75DF13CB3A721 118287~|~1~|~1~|~01/SAF/GREE~|~Construct a roundabout at the intersection of S Arlington Rd and Mt. Pleasant Rd in the City of Green.~|~21 - Safety~|~422ED8EE83A7C24E4DFCBF393FF57568DCD5A4B7 112626~|~1~|~1~|~01/MPO/WARR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~473D8FA8E71D25094B70A02BD805D71C174C4B4A 116725~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~2C302CF976C02376CBB06281CE7D5333E4C18AF2 114779~|~1~|~1~|~01/S>2~|~Replace FRA-605-2.69 structure over Schleppi Run~|~04 - Reconstruction - No Added Capacity~|~5774CFEAF52EF6573F0BBFCBEDDFDF2AD7E2E286 88914~|~1~|~2~|~02/STR~|~See Linked Structures.~|~13 - Bridge Rehabilitation~|~05A4D1653C19FFA595562F92766A3B35EF288687 88914~|~2~|~3~|~03/NFP/ODNR~|~Resurfacing of Mosquito Lake State Parking camping pads in camping area No. 2. Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~3FD0414FEC5B4AD12478C553F01FB02A387A4BBA 88914~|~1~|~1~|~01/STR~|~Resurfacing TRU-SR 88 7.03-13.95~|~05 - 4R Maintenance - Resurfacing~|~005C0617A6F8190B7DCC1BFBDDD26E6848D2C085 93455~|~1~|~2~|~02/NHS~|~All work not related to Structure Work/Bridge Enhancement from RIC-30-9.26 to 13.06.~|~04 - Reconstruction - No Added Capacity~|~F3F9A097831C1BA2543B81BB9557FE4F8994424A 93455~|~1~|~3~|~03/NHS~|~Decorative Railing and Letters - Bridge Enhancement:RIC-US-30-09.850 and RIC-US-30-12.870.~|~04 - Reconstruction - No Added Capacity~|~FBFE7F4F26D414AC7CE0CC89C7049FF403B1FB67 93455~|~1~|~4~|~04/NHS~|~Rehab work RIC-30-11.58L and RIC-30-11.59R.~|~13 - Bridge Rehabilitation~|~507D07A0BF40BD53898AA51AC7A84ACF62BAE9FF 93455~|~1~|~1~|~01/NHS~|~New Construction (Structure) RIC-US-30-10.790, RIC-US-30-11.380, RIC-US-30-12.210 and RIC-SR-30-12.380.Major Rehabilitation (Structure Remove) RIC-US-30-12.150.~|~10 - Bridge Replacement~|~C22A1DA53E7E5C4EB41E362D556C859E71787105 93455~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~44 - Other~|~ADA3A76162C4C20BAF82632B1380E78CFFEDB601 118799~|~1~|~1~|~01/SAF~|~Guardrail upgrade/replacement project on various routes and sections in Noble County.~|~21 - Safety~|~EB32B0D96372E736D9BCA465B6B8FA993F0C5BB6 94324~|~1~|~1~|~01/STR~|~From SLM 1.57 to SLM 4.88~|~05 - 4R Maintenance - Resurfacing~|~8D28745D0167743FCADCC56C5B29D5A6D287B0AD 117707~|~1~|~1~|~01/MPO~|~Plan split for micromobility stations.~|~28 - Facilities for Pedestrians & Bicycles~|~5098C8F81B0C059C4976212AD6CB9564539DD1AE 123531~|~1~|~1~|~01/NHS~|~Replace culvert type bridge carrying Carpenter's Run under US 30 and the on/off ramps at SR 170.~|~10 - Bridge Replacement~|~63DB3886FAB56B3489CD187F91286CF431FEF0A7 107864~|~1~|~1~|~01/STR~|~Landslide repair project, MOE 556 4.15-4.17. 80% Federal ER and 20% State funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FCA107DCB8DA919DC536DFB277D44F57E43B15F8 124513~|~1~|~1~|~01/STR~|~STP rural~|~10 - Bridge Replacement~|~803CD92DBA7B7E18427465EDB059F18D0CB9E501 95869~|~1~|~1~|~01/NFA~|~Landslide repair with a Type A contract by building a solider pile and lagging wall and SLM 3.91 on SR 26 in Belmont County.~|~04 - Reconstruction - No Added Capacity~|~49A65EBF4EA3BC7409C15F8840E8CE8CD9711CAF 92159~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for 2 years~|~21 - Safety~|~FC6520123FF2882A467505D834A91323EDB3378B 122281~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~9CACE6B03FFB9A154CF280999523E7B972F4A96A 115862~|~1~|~1~|~01/STR~|~Project includes construction of drilled shafts behind the existing guardrail to correct and prevent roadway slippage due to embankment failure. The paved shoulder and curb and gutter will be restored in the slip area.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C06D9A974F348EE001C001E3BC4B67CB011C3FF 126083~|~1~|~1~|~01/IMS~|~Plan split for bridge deck replacements on WOO-75-2383 & WOO-75-2484~|~13 - Bridge Rehabilitation~|~CDCAABC9F5DCBBFD0D283FDC0987514E7CB2722D 102015~|~1~|~1~|~01/IMS~|~Geological Site Management Funds - 4SF7 (90% Federal)/4SS7 (10% State) - CAP (See CAP Comments) - Rock scaling and installation of CIP barrier on LIC-IR 70-24.44.~|~21 - Safety~|~FFC9D1088D9878F21DDDE9E136BDB05CBA56B4E2 119730~|~1~|~1~|~01/STR~|~Asphalt resurfacing of SR 43 in the Village of Amsterdam, including full depth pavement repairs funded at 100% with 4SH7 (Oil & Shale) State Funds.~|~05 - 4R Maintenance - Resurfacing~|~131B2208CF4F7C1731490E371BD35EF16D4C15F8 116567~|~1~|~1~|~01/NHS~|~Plan Split for bridge work~|~10 - Bridge Replacement~|~A959EB42A496E6386D2818EFE259129863563F3E 125656~|~1~|~1~|~01/S>2~|~Plan split for Large Urban resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~3BF14E7DF9CA3022B38706F8BE20DE55F428B55D 125656~|~1~|~2~|~02/STR~|~Plan split for Rural resurfacing~|~05 - 4R Maintenance - Resurfacing~|~38D5B366BB383FC3418A0A3C995EFEC32D78BEF5 112720~|~1~|~1~|~01/NHS~|~replace decks on Champion, Linwood, and Ohio~|~13 - Bridge Rehabilitation~|~198AFE90518FA3082F22A044CCF46296DBC01D14 119891~|~1~|~1~|~01/NFA~|~NEVI Round 2 23-A~|~63 - Electric Vehicles & Charging Infrastructure~|~0D48A0672303DCF155E9CDAD8246779110C5CCED 115927~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - 80% federal (4PF7) and 20% State (4PS7) - replacement of existing structure (MUS US 22 18.03, SFN 6000576)~|~10 - Bridge Replacement~|~0575AF5F00112F241E3443CBEA58F9E71450CC8D 84468~|~1~|~4~|~04/NHS~|~Landslide repair on ATH 33 12.30-12.39. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E643AA2DDE4DB5C557BE19D367FBE354700E1745 84468~|~1~|~3~|~03/S<2~|~Concrete pavement removal and replace with full depth asphalt. ATH 13 0.00-0.04. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~84A420711DF5FF3F60B80CF04EDE45361573009D 84468~|~1~|~2~|~02/NHS~|~Concrete pavement removal and replace with full depth asphalt. ATH US 33 11.76-13.99 and ATH 550 0.00-0.73. NHS Federal/State 80/20%.~|~05 - 4R Maintenance - Resurfacing~|~EC24C291EDE32CF80F8F55C313C3ABC9870633F5 84468~|~1~|~5~|~05/NHS~|~Landslide repair. ATH 33 11.89-11.91. DSR ATH-002. NHS route funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CA3F8EB1971DA573C5EB141EEF426B6BEDBEAA37 84468~|~1~|~1~|~01/NHS~|~New full depth asphalt pavement and new full depth concrete on ATH US 33 11.76-13.99 and exit ramps. Funded 100% state 4RA7 major rehab funds.~|~05 - 4R Maintenance - Resurfacing~|~B78E210BD7858AB25B0F120325FC6B231D1EE00C 84468~|~1~|~6~|~06/NHS~|~Landslide repair. ATH 33 13.87-13.89. DSR ATH-004. NHS route funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FFC703F0D9212DC6DD5589C4E81EA388ABD0D01B 87210~|~1~|~2~|~02/STR~|~For work on SR 66 in Van Wert County from the Delphos Urban Area Limits at the north ramps of US 30, SLM 2.34 to the Putnam County line at 4.37. Work on SR 66 in Putnam County from the Van Wert County line at 0.00 to US 224 at 2.46. Work on SR 189 in Putnam County from US 224 at 0.11 to Winkleman Street in the Village of Ottoville at 0.30. All funds are from the District Preservation Program budget. There are no Local funds.~|~05 - 4R Maintenance - Resurfacing~|~CBABAFB9FAB7B8DA546B412375ECD5AF5868BC23 87210~|~1~|~4~|~04/NFP/DELP~|~This is for items that will be paid 100% by the City of Delphos.~|~05 - 4R Maintenance - Resurfacing~|~BFD59B559232F4C477BD23421B3A9894E9AC03BA 87210~|~1~|~1~|~01/S<2/DELP~|~Work on SR 66 in Van Wert County from Fifth Street at 0.47 to the corporation limits of the City of Delphos at 0.84. Work on SR 66 in Allen County from the south corporation limits of the City of Delphos at 10.49 to Fifth Street at 12.02 except for the portion from 11.3 to 11.66. Work on SR 190 in Allen County from the Fifth Street at 0.47 to where SR 190 leave the City of Delphos at 1.26 on the right side and 1.27 on the left side and then from 1.30 to 1.32 on the right side of the road. Work on SR 697 in Allen County from the Van Wert County line at 0.00 to SR 66 at 0.04. Work on SR 697 in Van Wert County from the west corporation limits of the City of Delphos at 6.68 to the Allen County line at 7.27. The split is for resurfacing inside the City of Delphos. The 20% non-federal match is the responsibility of the City of Delphos. The 80% federal funds are from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~D015FCE9CA90313664EC3E5223C460ADE99F1334 87210~|~1~|~3~|~03/S<2~|~Work on SR 66 in Van Wert County from the corporation limits of the City of Delphos at 0.84 to the Delphos Urban Area boundary at the north ramps at US 30 at 2.34. Work on SR 190 in Allen County from the corporation limits of the City of Delphos which are 1.26 on the right side and 1.27 on the left side until the Putnam County line on the left side at 1.41 and the City of Delphos corporation limits on the right side at 1.30 and on the side from the City of Delphos corporation limits at 1.32 to the Putnam County line at 1.41. All work is inside the Delphos Urban Area but outside the City of Delphos. All funds are from the District Preservation Program budget. The are no local funds.~|~05 - 4R Maintenance - Resurfacing~|~351A3F54EE76710DEB6A2AA1536F588CE15B45F6 87210~|~1~|~5~|~05/BRO~|~Work to repair the bridge on SR 66 over US 30 in Van Wert County.~|~13 - Bridge Rehabilitation~|~58063714B6AE58B450F20748D1C8D9E22783A7EB 116578~|~1~|~1~|~01/NFA~|~Culvert replacement project. VIN 328 6.46 (CFN 1817842).~|~04 - Reconstruction - No Added Capacity~|~68E897B7A590786C42C2CEEC906C701A119764C3 106025~|~1~|~1~|~01/NFP~|~Curb/Gutter Drainage~|~44 - Other~|~ED9E6CE2EF01D3BFBD7FBC20B32E0026E358EBBF 117363~|~1~|~1~|~01/BRF~|~Added plan split.~|~10 - Bridge Replacement~|~23B5CECA64E267D4A6E312C9430A088552258E62 123816~|~1~|~1~|~01/BRO~|~Plan split for all work on SEN-4-1230 bridge~|~10 - Bridge Replacement~|~F61E797ED4A2F66C95F4420B0CFBCFCD0F8D21E5 100622~|~1~|~1~|~01/STR~|~AC Overlay with repairs on: PRE SR 732 SLM 9.46 - 14.44~|~05 - 4R Maintenance - Resurfacing~|~A58882EC65FE3FCA34862043E4ED4B1E9770016F 100622~|~1~|~2~|~02/S<2~|~Ac Overlay with repairs on: PRE SR 732 SLM 14.44 - 15.49~|~05 - 4R Maintenance - Resurfacing~|~2DE09D04D92F426633D83D3996D5563EA1EA0462 101377~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~A222D591731B39104A16A41DB05A032BADDBE203 101377~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~BD0554B3B54C80C1709F6567F827C7C98296AFF1 101377~|~1~|~3~|~03/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~971E4AD38166EDC1F32246FC3CE57A356C2163AF 101377~|~1~|~4~|~04/S<2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~AFF2251F87524572D2367E9AA353AB1262F3DD7F 101377~|~1~|~5~|~05/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~93C19F577C61B6F5FCE9E84AFC39FFBFA6FEF1C0 101377~|~1~|~6~|~06/IMS~|~Repair of concrete wall/median along TRU IR80 in Trumbull County, Ohio.~|~44 - Other~|~26B4C8C7F1128D949B9EBAD3298269F61436E38C 103478~|~1~|~1~|~01/STR~|~D03 PR FY2022. 2 Year Contract.~|~44 - Other~|~4D56781BF7BF794D9468165B5B7B353871B2D912 110138~|~1~|~1~|~01/STR~|~Smoothseal WAY-57-0.00 to 1.229, WAY-585-8.47 to 11.98~|~05 - 4R Maintenance - Resurfacing~|~9D8A717139305FA6C3818A1CE84080D7CE589D63 110138~|~1~|~2~|~02/S5K~|~Smoothseal WAY-57-1.229 to 2.195~|~05 - 4R Maintenance - Resurfacing~|~85BFAA7994B68087BC952FEE1C5616B27E4B237F 116161~|~1~|~1~|~01/SAF~|~Realign CR7E to improve sight distance.~|~21 - Safety~|~134B20FF901F717E95E0315E614AE73538B58548 96515~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~4DDFCC650A4C398E7409A9A70CF6CF7518741CC9 96515~|~1~|~3~|~03/IMS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~8E7458CA4DEEF382F071B7AC39298E68298B3282 96515~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~34BEAA357A5B1AA090E9A957B1C576300BE38AD1 113825~|~1~|~1~|~01/SAF~|~Split for SRTS project~|~21 - Safety~|~8D96CCB8B3DF328D2FAA37774AFA02B86F4ED1B0 103410~|~1~|~1~|~01/BRF~|~bridge split~|~13 - Bridge Rehabilitation~|~5511BBCADE4E2F754D38A977C691C96DB8C6B437 124941~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~9B8D1B57AD7BFDBB4482967414CEF005B5E62C99 90194~|~1~|~1~|~01/IMS~|~Highway Lighting~|~44 - Other~|~71701AB293D0826218698385AF45E538F798EF88 110466~|~1~|~1~|~01/SAE~|~Construct roundabout at the intersection of US-127 & SR-73.~|~21 - Safety~|~17AF554E205EE447E74A0DF638627D74CBDEC826 110466~|~1~|~2~|~02/STR~|~Plan Split for the retroactive change order for fuel price adjustment~|~21 - Safety~|~58BDA4F7A398404E0EF88AE759378CE9E4EE2433 105162~|~1~|~1~|~01/MPO~|~Widening of Auburn Avenue to five lanes between Dorchester and Gilman Avenues. The intersection of Auburn Avenue with Huntington Place and the entrance to the Hamilton County Juvenile Detention Center will be realigned. Improvements to the Auburn Avenue intersection with Dorchester Avenue and Sycamore Street (5 points intersection) will also be investigated.~|~21 - Safety~|~E66BE2328AC3E19DD243C4F6EC4288A005906141 91820~|~1~|~1~|~01/BRO~|~80/20 funding split for all funds on this project.~|~13 - Bridge Rehabilitation~|~1894E701ACFD04FAF5DAE49462991A1491F1A718 91820~|~1~|~2~|~02/ENH~|~80/20 fund split for items of work using enhancement funds.~|~13 - Bridge Rehabilitation~|~829269A6024891B108F5959EC3140DC857F86B52 93393~|~1~|~1~|~01/BRF~|~Johnnycake Rd Bridge SFN 6734952 over feeder canal tributary~|~~|~BD308982F85A63D99D0D40E6E0DBA9A0ADCFC64F 126212~|~1~|~1~|~01/NHS~|~Concrete overlay.~|~47 - Bridge Preventive Maintenance~|~65D75E1442442AAF79488B61C299EFC2D65B6C61 91435~|~1~|~1~|~01/BRF~|~Superstructure replacement. VIN 328 2.30 (SFN 8202532). BR Eligible off system. Funded 80 federal/20 state.~|~10 - Bridge Replacement~|~EC8C59A97C55AAB1447F6140E1D43345135E37E7 82746~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - Geological Site Management 4SF7(90% Federal) / 4SS7(10% State) - No CAP - Slip repair above Gue-IR 70-00.09 to 00.12~|~~|~5C24AF5EC8DBC2984CF1B36F73EC728211F523BB 112765~|~1~|~1~|~01/S<2~|~Asphalt resurfacing from SLM 11.98 to SLM 12.42 and from SLM 25.30 to SLM 26.02.~|~05 - 4R Maintenance - Resurfacing~|~0DD582518FEC658353A199318D8ACD11D50DEB15 112765~|~1~|~2~|~02/STR~|~Asphalt resurfacing from SLM 12.42 to SLM 25.30.~|~05 - 4R Maintenance - Resurfacing~|~BC7D6B6487E9297373E66046A00D8383A3269874 87314~|~1~|~2~|~02/S<2~|~Resurfacing of SR 45 from SLM 0.2 ot 0.88 in the urban area of East Liverpool~|~05 - 4R Maintenance - Resurfacing~|~C497F8934C168681B6083FA21515022F5B2725A2 87314~|~1~|~1~|~01/STR~|~Resurfacing on SR 45 from SLM 0.858 to 8.95~|~05 - 4R Maintenance - Resurfacing~|~C7BC9215BB4826EEEF35ED3C5D98EC34E4096AA8 101347~|~1~|~1~|~01/STR~|~bridge rehab.~|~17 - Construction Engineering~|~6EBA36720CA59CAF9A28F6BC3B385AB3518B20C7 89374~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Addressing soft base material at 1) MUS SR83 6.42-6.46; 2) MUS SR83 6.61-6.65; 3) MUS SR83 6.8-6.84~|~44 - Other~|~55EE6A44A1C0934D773DA71368EE9EA4671C55E2 109309~|~1~|~1~|~01/NHS~|~Rehabilitate Structure JEF-7-1369 (SFN 4100751) via superstructure replacement and conversion to semi-integral abutments. Abutment and Pier Cap repairs will be performed, Bearings will be replaced.~|~13 - Bridge Rehabilitation~|~DE59AB2D573EB54488D5799CE754951519CC636A 106985~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - City of Zanesville resurfacing project using 4TA7 funds on Dresden Road (CR 2) from 0.00 to 1.04~|~05 - 4R Maintenance - Resurfacing~|~121C01A15B4F2028CC53E60BF57F22091AA9816E 95969~|~1~|~1~|~01/NFA~|~01/NFP/OT/ ; Uses 100% LBP7 funds. All work for this project uses this split.~|~44 - Other~|~CDEF16ADD73ECE9AA42A986E06CD29CE11A47BA7 102477~|~1~|~2~|~02/STR~|~Asphalt resurfacing of BEL-331~|~05 - 4R Maintenance - Resurfacing~|~B1E5955D0E76DAA552F61BC94EE4EB51CD0B5158 102477~|~1~|~1~|~01/NFA~|~Resurfacing SR-26~|~05 - 4R Maintenance - Resurfacing~|~D03BBC8B73D6DDF1213C8F7CB94FAFD64D395775 117713~|~1~|~1~|~01/NHS~|~ITS maintenance activities throughout District Six~|~21 - Safety~|~EC16A649E900B6236A38576EDA5A2B3A9B1260BF 103662~|~1~|~1~|~01/NFP~|~Mowing various routes in FAY, FRA, MAD, PIC counties~|~44 - Other~|~2489AAD53354601E9DB8DA18903AFD1BB8FC27E1 112267~|~1~|~1~|~01/S5K~|~STP 5k-50k plan split for the culvert on PIC-104-15.756.~|~44 - Other~|~2982505153261856157E5D5118FF2313ECC04BB4 112267~|~1~|~2~|~02/STR~|~Rural plan split for the culvert on PIC-22-4.815.~|~44 - Other~|~3FE5C8802854C331C2BB6121D85EF81BBFDA19E2 112328~|~1~|~1~|~01/SAF~|~JAC-35 (1.79-2.75) Rest StopConsolidate the access points for rest stop and add an acceleration lane.~|~21 - Safety~|~6F48946836A26BB0C09DE4A6F0D69927693A77FF 112328~|~1~|~2~|~02/NFP~|~Mill and fill the rest area parking lot.~|~21 - Safety~|~E4091C8F36EC5648DD3D5E9AA720A1289F9AD218 112328~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~385EC628C0E732E673ECA1AAAADB9458653CD1F8 126521~|~1~|~1~|~01/NFA~|~Created for J&C Involvement.~|~44 - Other~|~97C1C5695E6D54D93AF4278BEC3C6469C73A6C3C 112718~|~1~|~1~|~01/NHS~|~Replace deck on Lewis Center over I71 and Powell Road~|~13 - Bridge Rehabilitation~|~45C369325E9E5958EB869A3187280EFE8237E330 98066~|~1~|~1~|~01/IMS~|~Interstate Bridge Rehab 100% State~|~13 - Bridge Rehabilitation~|~B83F8931E821DFF7AFA257693B157C6F79087AFE 117257~|~1~|~1~|~01/STR~|~Culvert Replacement WAS 550 16.24, CFN 1885152.~|~04 - Reconstruction - No Added Capacity~|~E1E784934B62E90616DA9AFF8F6B59230E200AF1 105502~|~1~|~1~|~01/IMS~|~Lighting replacements on Interstate routes inside the City of Cincinnati.~|~21 - Safety~|~63BEA421A9BBA306A43B7D25E6EAC37970D82C97 123934~|~1~|~1~|~01/S5K~|~Slope stabilization along US 22 in Muskingum County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~691B0039B9CF7E676E3F8DF9BA0A439BC8010851 85360~|~1~|~1~|~01/NHS~|~80/20 funding split for the resurfacing work that is eligible for federal funds~|~05 - 4R Maintenance - Resurfacing~|~CE6B1BE50189272854B8D58BFE1801FF9368AA15 85360~|~1~|~2~|~02/SAF~|~Roadway safety improvements that qualifies for federal-aid~|~21 - Safety~|~B24783A6EB0A3C5C2A8DBE8AC52EAA209C6A301A 118679~|~1~|~1~|~01/S5K~|~Resurface County Road 33-A~|~05 - 4R Maintenance - Resurfacing~|~476C52470E33E7104AD24B86310C3C9BC348913D 118679~|~1~|~2~|~02/STR~|~Resurface CR 33-A~|~05 - 4R Maintenance - Resurfacing~|~5F53B37E18046ACE8860EA56ECEF24B5FFA4EA46 103101~|~1~|~1~|~01/STR~|~One year fast dry pavement marking contract on various routes~|~44 - Other~|~EE2F4066395E17E1E931BB1D415AD36D803F3941 93284~|~1~|~1~|~01/STR~|~District Preservation Bridge Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4202139 KNO SR514 6.48 Intersect: Mohican River; BR Eligible for Rehabilitation & Replacement: Length=400 SD/FO(1) SR=89.7 DSR=4~|~13 - Bridge Rehabilitation~|~4BDA16494A8DAACB032541CE3A000A51F3CDD42B 108633~|~1~|~1~|~01/SAF~|~Construct southbound right turn lane and realign the northbound left turn lane~|~21 - Safety~|~66EFE7B432BD071FCC4FE86BC8572313597D2FAC 80997~|~1~|~1~|~01/CMQ~|~MPO CMAQ funds to be used on eligible items of work.~|~28 - Facilities for Pedestrians & Bicycles~|~5AE964D58EE9817F16A9D71DDA10808A92D25380 80997~|~1~|~3~|~03/ERD~|~80/20 fed/local earmark to be used as described in the funding bill.~|~28 - Facilities for Pedestrians & Bicycles~|~5B3F47D241F6F10ED18C70621A49781A4605CC64 80997~|~1~|~2~|~02/ERD~|~100% earmark to be used as described in the funding bill.~|~17 - Construction Engineering~|~D25655749F7207ADEFD374CF9F5E36B8DB18F565 80997~|~1~|~4~|~04/NFP~|~100% local cost --- alternate bid items~|~28 - Facilities for Pedestrians & Bicycles~|~359FE5927863DA818489E0D8D476F427F407B82D 96702~|~1~|~1~|~01/NFA~|~ATB Conneaut Outpost, convert cold storage into Coverall, keep existing walls and demolish the rest. Build a cover-all on existing walls to include a fron with an overhead garage door. Existing size approx 50'x55'~|~~|~70A0D0302EE8B37C51093F6485AD23CE6FFCEE9E 95822~|~1~|~3~|~03/NFP~|~Pavement repairs, curb, curb ramps,... items not eligible for Urban Pav.~|~17 - Construction Engineering~|~ED111A749A7DA0B04BB943E4E2E109D10A66FEA8 95822~|~1~|~2~|~02/S<2~|~from SLM 13.89 to SLM 15.38 Urban Pav~|~05 - 4R Maintenance - Resurfacing~|~AABEEF2F4074D78DF56BC51556BADAD68967452A 95822~|~1~|~1~|~01/NHS~|~From SLM 12.09 to SLM 13.00, then from 13.26 to 13.89.The gap section on SR-18 between 13.00 to 13.26 is under PID 98722.~|~05 - 4R Maintenance - Resurfacing~|~273C43EBD19B3CF748FD47D6D987C9D4DBEF28DA 99004~|~1~|~1~|~01/ENH~|~CBD Enhancement~|~31 - Landscaping & Other Scenic Beautification~|~9F287A13FB277A56533087D7B6EF46CF549B1F46 99004~|~1~|~2~|~02/MPO~|~Plans split for pavement reconstruction~|~04 - Reconstruction - No Added Capacity~|~18842E7CAE20AE742B110BE2BAD2A8A106CEFF84 116449~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4.~|~21 - Safety~|~1F39540678058DBD33EDCD2F1D78E0B5D8CED942 119797~|~1~|~1~|~01/NHS~|~Repair damage to bridge carrying SR 872 over SR 7 caused by over height vehicle collision.~|~13 - Bridge Rehabilitation~|~14E730AC2EC05291E52D79F5B129641CE1E046A6 97570~|~1~|~2~|~02/BRF~|~Replacement of Bridge No. PRE-CR 97-0290 (SFN: 6836348)~|~10 - Bridge Replacement~|~77E7F90C8474571CC074EB8CAE56AD1B42337C6F 97570~|~1~|~3~|~03/BRF~|~Replacement of Bridge No. PRE-CR 97-0300 (SFN 6830242).~|~10 - Bridge Replacement~|~2F143518E2C477754AB910D1FE7876C210381657 97570~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. PRE-CR 21-0945 (SFN: 6830374) in Preble County.~|~10 - Bridge Replacement~|~4944E3DC6C34D96ABE68AD6F2DFC6E4D38CF2663 96921~|~1~|~1~|~01/NFP~|~New County Full Service Maintenance Facility~|~44 - Other~|~D903561B812AC38981ABE8B95C6089011F77DBCA 93461~|~1~|~7~|~07/S>2~|~Bridge deck sealer treatment on: SFN 5703645 MOT-048-1214~|~13 - Bridge Rehabilitation~|~0D126E3E5C17EE5349AED22BAC1CE1D29BEF6D11 93461~|~1~|~6~|~06/S<2~|~Bridge deck sealer treatment on: SFN 1206249 CLA-571-0024/SFN 1201115 CLA-040-1396/SFN 1201700 CLA-041-2067L/SFN 1201085 CLA-040-1380~|~13 - Bridge Rehabilitation~|~266756851FEBF4E65C285B1665B206EA2FCED98D 93461~|~1~|~3~|~03/NHS~|~Bridge deck sealer treatment on: SFN 5701619 MOT-035-1395R/SFN 5701600 MOT-035-1395L/SFN 5702321 MOT-035-1639S/SFN 5702755 MOT-035-1800S/SFN 5702313 MOT-035-1639R/SFN 5712998 MOT-035-1441/SFN 1101773 CHP-068-0066L/SFN 1101803 CHP-068-0066R/SFN 1101838 CHP-068-0119L/SFN 1101846 CHP-068-0119R/SFN 5700280 MOT-004-0712/SFN 5700183 MOT-004-0238/SFN 1200364 CLA-004-1102R/SFN 1203061 CLA-068-1138L/SFN 1203096 CLA-068-1138R~|~13 - Bridge Rehabilitation~|~84F22B60FC9686DE546822C8111C74A143BF11F9 93461~|~1~|~4~|~04/BRO~|~Bridge deck sealing treatment on: SFN 5701899 MOT-035-1566/SFN 5704073 MOT-049-0275~|~13 - Bridge Rehabilitation~|~9FF4F7CAE9FEF36BDF9264B217FC7BD510E6080D 93461~|~1~|~5~|~05/STR~|~Bridge deck sealer treatment on: SFN 1102834 CHP-559-0390/SFN 1101498 CHP-055-0624/SFN 1100203 CHP-004-0974/SFN 1203185 CLA-068-1274L/SFN 1203215 CLA-068-1274R/SFN 1203304 CLA-068-1309L/SFN 1203339 CLA-068-1309R~|~13 - Bridge Rehabilitation~|~DA396EFE4E1A6E8C0DED50562DFAF83735584F10 93461~|~1~|~2~|~02/IMS~|~Bridge deck sealer treatment on: SFN 1204777 CLA-070-1832L/SFN 1204807 CLA-070-1832R/SFN 1204629 CLA-070-1576R/SFN 1204599 CLA-070-1576L/SFN 5705231 MOT-070-0719/SFN 1203967 CLA-070-0634R/SFN 1204920 CLA-070-2015/SFN 1203932 CLA-070-0634L.~|~13 - Bridge Rehabilitation~|~E53D78B4A7DC93788BD17D75E581857DCC67C35C 93461~|~1~|~1~|~01/BRO~|~Bridge deck sealing treatment on SFN 5704502 MOT-049-1091L~|~13 - Bridge Rehabilitation~|~F79A52403BEDD45B6C6C6C0818E9FEB7A866FFEF 87226~|~1~|~1~|~01/STR~|~Brdg Prelacement. 6.26 miles east of the Brown County line. 0101745 ADA US52 6.28 Intersect: Bradford Run80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~128D46C87305B0A53FC32A76CDB8C64D96CFBF96 109302~|~1~|~1~|~01/SAE~|~Install new guardrail for fixed object protection~|~21 - Safety~|~563A2DCB7696CCF68105F6FBDD57C27171FEC0A7 109350~|~1~|~2~|~02/SAF/WIL~|~Replacement of existing city water line along SR 73.~|~43 - Utilities~|~A6E39283E620ECB7A844F90B15043C22C17C3639 109350~|~1~|~1~|~01/SAF~|~Convert signalized intersection at SR-380 to an intersection with turn lanes and keeps the signal.~|~21 - Safety~|~F0992AD92B2DD8B41A67EBE9B7D9E296C6EF6030 94907~|~1~|~2~|~02/STR~|~D6 funding for replacement of existing storm sewer which is within RW~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~196967D1C0F73B6EED5CD5EF4007F8D21AD1F9A6 94907~|~1~|~3~|~03/S<2~|~Paving from the beginning of the project to Lambert Rd~|~05 - 4R Maintenance - Resurfacing~|~D0C8BC3714EE4C19DDD84E5388B463F278C50EC1 94907~|~1~|~1~|~01/STR~|~D6 funding to resurface FRA-62, SLM 1.65-2.97~|~05 - 4R Maintenance - Resurfacing~|~391AA98A0B591F3DA4741A8D2D7F87EABB66435D 82749~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - No CAP - Slip repair beneath the roadway on Gue-SR 265-15.54 to 15.56~|~~|~5844301D0B0B8BDEB4B980A68F73D9811F2763B8 103364~|~1~|~1~|~01/SAE~|~100% 4HB7 federally funded pavement markings.~|~21 - Safety~|~7EF0EA15202EA50B66F677EE5E660EBCF6352FEF 87806~|~1~|~1~|~01/NFA~|~Bridge replacement project. Replace existing 3 span structure over Federal Creek. Includes 200 L.F. of new roadway at the west approach. SFN 0545457. 80% Federal/15% Credit Bridge (also Federal) and 5% Local.~|~10 - Bridge Replacement~|~5E92632A5A9838A19FA8742E9AF6C82BE1BC2A05 103534~|~1~|~1~|~01/NFA~|~The County is constructing improvements to CR 140 and TR 420 specifically the roads will be widened from the current 19 feet to 24 feet to better accommodate the increased traffic as well as the additional truck traffic on both roads.~|~01 - New Construction~|~80A4D4E8703B0E7C9FD7E76B8E2ED449E7CD06E5 112875~|~1~|~1~|~01/S>2~|~MAD-40 from SLM 15.92 to 16.14~|~05 - 4R Maintenance - Resurfacing~|~C5CB8314C0E00708EAF0F8A68595004EB1BF8347 112875~|~1~|~2~|~02/STR~|~MAD-40 from SLM 7.86 to 15.92~|~05 - 4R Maintenance - Resurfacing~|~5EAECC3BB9D3C0A668B0B4562F12122389E9C13D 98166~|~1~|~1~|~01/NHS~|~Plan Split for Rockfall/ Bench Cleaning.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A5B804A6FDF8296973F5EFB32265412F0B17BEB3 120850~|~1~|~1~|~01/CMQ~|~Extend existing paths in Lick Run and new multi use paths connecting to existing trails~|~28 - Facilities for Pedestrians & Bicycles~|~A1EA89EA4DE7A460F3D9B9647A429CD58E790695 125836~|~1~|~1~|~01/IMS~|~Plan split for bridge work on GRE 71 1.50/2.99 structures. ~|~13 - Bridge Rehabilitation~|~609D473C7FA5F89B37E2133EBBA5D978A8D8301C 110422~|~1~|~1~|~01/SAE~|~Construct an RCUT intersection at SR-32 & Bauer Road and evaluate improvements at the intersection of SR-32 & Herold.~|~21 - Safety~|~5B636D404D051B3B866E8F9D192FFD0311C0C648 110422~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~713116E044CBED23EF6BC535543DB5C2226D524E 85139~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of CLI-22 within the project limits. The section is between SLM 12.57 to 22.92~|~05 - 4R Maintenance - Resurfacing~|~60491FBACCD112A156EE49CE1FC575B1507ED4E1 85139~|~1~|~2~|~02/STR~|~Replace small culverts CLI-22-1389 and CLI-22-2235.~|~04 - Reconstruction - No Added Capacity~|~B1DF1C2E5E5768C3758DFF7F72D37550D54D7508 93061~|~1~|~1~|~01/SAE~|~This event is for safety work eligible for 100% federal funds. The funds are from the City of Findlay budget.~|~21 - Safety~|~C101341331E966274FC68E02F0DED85A1718E0A6 124235~|~1~|~1~|~01/IMS~|~Plan split for bridge replacement work~|~10 - Bridge Replacement~|~747AF4C82935B9E95BA012FCE1D6DBCE235C8247 106112~|~1~|~1~|~01/S<2~|~DSR JEF-001~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~753D7396550219B2F3528728D6CE5B9264E8A982 95799~|~1~|~1~|~01/STR~|~from SLM 15.09 to SLM 19.47~|~05 - 4R Maintenance - Resurfacing~|~2387B21C98E9B47D3713E86D941DE3CB4E655BCC 122798~|~1~|~1~|~01/MPO~|~Installation of EV chargers for the City of Oxford~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~3DB58E245BD9101F27BDFB6A19B6D825C077E8D8 100782~|~1~|~1~|~01/STR~|~AC Overlay w/repairs SR 66 in Auglaize County AUG SR 66 SLM 5.62 to 9.36~|~05 - 4R Maintenance - Resurfacing~|~E5223BC0A145AB302C57B848F3E460DA64072218 100782~|~1~|~2~|~02/S<2~|~AC Overlay w/repairs SR 66 in Auglaize County AUG SR 66 SLM 4.57 to 5.62 AUG SR 66 SLM 9.36 to 10.69~|~05 - 4R Maintenance - Resurfacing~|~9E07F93BFF59BDBD9704BA923EBDC314B1C6F9A2 100782~|~1~|~3~|~03/SAF~|~Adding extra rumble strips~|~21 - Safety~|~17A2DF15F2B6D27906BA7870726668BB7183DDEB 121305~|~1~|~1~|~01/ERD~|~Improvements for pedestrians and cyclists along Central Parkway by completing a road diet, adding curb bump outs, installing a bike lane, etc.~|~28 - Facilities for Pedestrians & Bicycles~|~73C8086E2F017DBB5363402F6D7855539D9988E9 118967~|~1~|~1~|~01/NHS~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~07460E6854A1A6255271B72E77A641217AFA3865 93914~|~1~|~1~|~01/SAF~|~100% federal funding up to funding cap to provide sidewalks, stand back area, curb ramps, crosswalks~|~21 - Safety~|~2DE5216783F9E9BA64B369C10B4D7A2F034C6935 100491~|~1~|~1~|~01/STR~|~JAC SR 93 8.60-13.61~|~05 - 4R Maintenance - Resurfacing~|~4C2F7EF2D7D7F14DA7452046CB08AC352DD87DE4 100491~|~1~|~2~|~02/S<2~|~JAC SR 93 13.61-13.67~|~05 - 4R Maintenance - Resurfacing~|~46D42775AF29297596D3147877BE318E47A57DCD 100491~|~1~|~3~|~03/NHS~|~JAC SR 93 13.67-14.29~|~05 - 4R Maintenance - Resurfacing~|~83A8F931776FDDF437FAC17EA934BF1E7DCDB700 100491~|~1~|~4~|~04/NHS~|~JAC SR 93 13.88 (SFN 4000951)~|~47 - Bridge Preventive Maintenance~|~5B6F446CA1B9678B3D02B76D3B39FBD2AE3CF47D 88976~|~1~|~1~|~01/NHS~|~JAC US35 1.69 - 8.35 Resurfacing ProjectOn US35 it is proposed to begin resurfacing the highway 1.69 miles (SLM1.69) east of the Ross/Jackson Co. line and continure to east for 6.66 miles (SLM 8.35).80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~C9D3BC0E687E35437F6B72C0472072495CDE73EA 120681~|~1~|~1~|~01/BRF~|~rehabilitate Felicity Cedron Rd. Bridge (SFN 1358502)~|~13 - Bridge Rehabilitation~|~67EE71DEE8713FD2943C63F8A25373B6E2932403 116967~|~1~|~1~|~01/S>2~|~Transportation Improvements - Parking, lights, curb, sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~08E5A96B2B9A894599D259B00DD29E88E638820B 117523~|~1~|~1~|~01/ENH~|~Sidewalk replacement and additions along various roads in Village of Magnolia utilizing Federal TAP (4B37) funds at 95%.~|~28 - Facilities for Pedestrians & Bicycles~|~30F7D1F87674E285584BABA9BAC7C8F4A5D2C703 117523~|~2~|~2~|~02/ENH~|~Material Cost Reimbursement with 100% Local funds. ~|~44 - Other~|~2A1666D61605E99EF72ED1B50CB9BBC001A872DB 104845~|~1~|~1~|~01/NFP~|~Construct combination MS/CS building~|~44 - Other~|~83037419BF0F38CB562D0CEBB3F76489D6C3A8CE 106117~|~1~|~1~|~01/NFP~|~VGCS bridge~|~44 - Other~|~52C56E3FD7ACA262EACFE72A4491E831D0703B78 107211~|~1~|~1~|~01/ENH~|~Rehab of historic Cemetery Bridge in the Village of Poland.~|~13 - Bridge Rehabilitation~|~F41CAC097825E6D1C68505BA5FB589FFBA22243B 93415~|~1~|~1~|~01/IMS~|~LUC IR475 0-8.98~|~05 - 4R Maintenance - Resurfacing~|~93FBA750120A6CF0D0F2E706CCCFE58EAC66D677 94526~|~1~|~1~|~01/BRO~|~Remove and replace mainline structures over U.S. 68. Replace culvert carrying Mill Creek. SFN 1204238 CLA 70 11.01 R~|~~|~97559D2B92A9CE24AD103B260CB60E5F0249D996 94526~|~2~|~2~|~02/IMS~|~Remove and replace mailine structures over U.S. 68. Replace culvert carrying Mill Creek. SFN 1204262 CLA 70 1128 and SFN 1204203 CLA 70 1101 L.~|~~|~F367724A0F9DA9DD189C10D2378DAF126FF8C9E9 94500~|~1~|~1~|~01/NFP~|~100% State Funds for district wide auxiliary pavement marking.~|~21 - Safety~|~5D4057B455BCF282EC182D35DD235FA6DDCEB10F 125895~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MOE 145 0.00-8.30~|~05 - 4R Maintenance - Resurfacing~|~5C1F9BD38274E5669E4970987991891D8CA52E62 109284~|~1~|~1~|~01/STR~|~For resurfacing work on CR 122 which is classified as a Rural Major Collector. 80% federal funds and 20% local funds. Funds needed if cap is exceeded will be 100% local funds.~|~05 - 4R Maintenance - Resurfacing~|~E7D6428E4993917B65AD288BA019724420C228C7 109284~|~1~|~2~|~02/NFA~|~For resurfacing work on CR 134 which is classified as a Rural Minor Collector. 80% federal funds and 20% local funds. Funds needed if cap is exceeded will be 100% local funds.~|~05 - 4R Maintenance - Resurfacing~|~64D687E1CB2A5A71EF61DE76815827884C734BEE 95487~|~1~|~1~|~01/CMQ~|~Construct a multi-use trail to improve access to the existing east-west bikeway parallel to Austin Boulevard and the Great Miami River Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~DF497D92658640DDB08BA8367B19EE4B7865A120 107134~|~1~|~1~|~01/BRO~|~Bridge replacement with 95% CEAO LBR (4B87) and 5% Local (LNTP) funds.~|~10 - Bridge Replacement~|~0D7CA982F829896E20AEFFC0764860D8C13AC131 111509~|~1~|~1~|~01/MPO~|~TMACOG funded items~|~21 - Safety~|~5D90A63C415B2428F38E506C78F003A796EFFB70 109645~|~1~|~1~|~01/STR~|~Resurfacing CAR-9~|~05 - 4R Maintenance - Resurfacing~|~68FBCEC0965DF0ED68650866F1859C365285EC70 87286~|~1~|~1~|~01/IMS~|~Resurfacing of SUM IR 271 from 6.62 to 8.54.~|~05 - 4R Maintenance - Resurfacing~|~D6CBB8189B28748EE6FA8FC0123BCEFFD041B69E 87286~|~1~|~2~|~02/IMS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~58AB8D1778C0B506670AF10350C5F5E009CE0377 87286~|~1~|~3~|~03/NHS~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~B71363A8C1F5974B0CEC38DBF5096487C5B21902 120995~|~1~|~1~|~01/NHS~|~Resurfacing on a portion of HAM-126~|~05 - 4R Maintenance - Resurfacing~|~47D403906F91BB3060B8E7B19A3A8FF3755BA382 104852~|~1~|~1~|~01/NFA~|~The City will construct a new two lane road starting at Latchaw Drive and heading north about 1,500' terminating at the property of an existing industrial customer~|~01 - New Construction~|~611D5ECCEE713CABFF6DBD8FC70382DE137EA21D 116747~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~10C757ACB3682A51B30EB9152D2C9E293048A660 116747~|~1~|~3~|~03/STR~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~0E4A1994043CA2D8412A39C9D570CF61C843B9B9 116747~|~1~|~4~|~04/STR~|~Bridge maintenance.~|~04 - Reconstruction - No Added Capacity~|~93FEFFA104E4E3BBC6321048CAE6B57C2B05E13C 116747~|~1~|~2~|~02/STR~|~Parking area at the Berlin causeway.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4605C2836B7B5C864A031EC57164FE6D795A1201 75630~|~1~|~1~|~01/STR~|~Replace Bridge No. WAR-123-1296, SFN: 8304351. Bridge carries SR 123 over a Tributary of Halls Creek.~|~10 - Bridge Replacement~|~86D14543FFE0E671EA5CFD7097893E336FD7C80B 92162~|~1~|~1~|~01/S<2~|~A small city funded project to reconstruct and widen linfoot in the City of Wauseon. FUL SR2 0-0.51~|~03 - Reconstruction - Added Capacity~|~B9859841DD1602CB8D7DB405D2FADE53D8E95FF7 121172~|~1~|~1~|~01/NFP~|~crack sealing plan split.~|~99 - State Preventative Maintenance~|~A26E7CD2AC4AD40A8A3CA184C4233BF3D71BDD0C 115742~|~1~|~1~|~01/S>2~|~Plan Split for the 80/20 items on the Urban paving on HAM-561~|~05 - 4R Maintenance - Resurfacing~|~130AF1CEA6BBFDC2576FEE69F38E3012622353DA 115742~|~1~|~2~|~02/S>2/CIN~|~Plan Split for the 100% City portion of the project.~|~05 - 4R Maintenance - Resurfacing~|~5CF3B980F3EBB1407F3F7B07387823619210AE98 101938~|~1~|~1~|~01/ENH~|~SRTS Wadsworth on Sunset and Stratford.~|~28 - Facilities for Pedestrians & Bicycles~|~AEFCC37D485D3A76FF0127579D424A653637BA81 101987~|~1~|~1~|~01/NFA~|~Resurfacing project. GAL CR 60 0.00-3.89. 80% Federal Lands Access Program (FLAP) funds and 20% Local.~|~05 - 4R Maintenance - Resurfacing~|~527B7858D18B233C106E5F7230EB913AEBDC351A 121819~|~1~|~1~|~01/S50~|~Asphalt Concrete Overlay with Repairs including bridge maintenance (Fed/Local Split) ERI-4-10.590 to 12.202~|~05 - 4R Maintenance - Resurfacing~|~565B20AAABD772D4912C79E8E6A5C9C973CAD56F 121819~|~1~|~2~|~02/S50~|~Asphalt Concrete Overlay with Repairs (100% Local Split) ERI-4-10.590 to 12.202~|~05 - 4R Maintenance - Resurfacing~|~F413EAA616286B0E3EB4B6F53E2C5920A8B4B85C 119121~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~CAD2659592E93CF92607F48796435C4CE474CECC 119121~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~901C46A92903DF9AB70FEBFA3D0D7BE5F1CC9289 122289~|~1~|~1~|~01/IMS~|~Plan Split for the reconstruction of IR-480 entrance ramps at Ridge Rd~|~04 - Reconstruction - No Added Capacity~|~7FA2E3BFBC26FE9ACEE51499E34AE4411BE9871F 114800~|~1~|~1~|~01/STR~|~Rural Plan split~|~05 - 4R Maintenance - Resurfacing~|~7BA7691CC29EB9736205C00049AB7E93BB02D424 110494~|~1~|~1~|~01/STR~|~plan split for pavement work in the rural section of CLE-232~|~05 - 4R Maintenance - Resurfacing~|~E4E466627EC6A75A92A11725F1CB365A969F72BD 110494~|~1~|~2~|~02/NFA~|~plan split for pavement work in the non federal sections of CLE-232~|~05 - 4R Maintenance - Resurfacing~|~F2D2A9DA6D0BD130FBB0176EF26FCF30B147B0C6 99483~|~1~|~1~|~01/BRF/GUER~|~"01/BR/BRF/GUER" - Guernsey County Bridge replacement on County Road-utilizing CEAO funds federal/state exchange~|~10 - Bridge Replacement~|~A24394BE02085506DAB8D2AC5F306DF4A3A21E34 108363~|~1~|~1~|~01/NFA~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C540608313B18E156C5382D9DB2BA57DAE74B709 102729~|~1~|~1~|~01/IMS~|~This plan split is for bridge rehab on Interstate bridge.~|~13 - Bridge Rehabilitation~|~4F39E9D852C6E5217C104E892E01B9AD3899B67A 105908~|~1~|~1~|~01/IMS~|~Plan split for interstate bridge work~|~13 - Bridge Rehabilitation~|~3964BB9D75F21E6CE1F5E657152DE1F201597BEA 105908~|~1~|~2~|~02/NHS~|~Plan split for NHS bridge work~|~13 - Bridge Rehabilitation~|~6B033F8ED46ED302AD37E144635FB48922193114 114063~|~1~|~1~|~01/S<2~|~Plan split for federally eligible construction related expenses within federal cap.~|~21 - Safety~|~D83BA8D5F48049D964694CF39C80BB125D4261B3 102629~|~1~|~2~|~02/STR~|~"02/STR/PV/ " plan Split 2 for Kno-95-5.69 to 11.50 and Kno-546-00.00 to 02.15~|~05 - 4R Maintenance - Resurfacing~|~6BEE6ADD1A6747FEF1D71D46C0F2D11FFB325A23 102629~|~1~|~1~|~01/S5K~|~"01/SK5/PV/ " - Plan Split 1 for Kno-13-20.88 to 23.11~|~05 - 4R Maintenance - Resurfacing~|~060CB7387A0AD0A9E87BB8F4A17FEE39F700116C 105496~|~1~|~1~|~01/IMS~|~Plan Split for bridge over I 70~|~10 - Bridge Replacement~|~40A0DD794D81F165E614C2ABB67F65E5495B28C9 101569~|~1~|~1~|~01/S<2~|~Repair bridge by patching abutments and deck edges using anodes, and encasing piers~|~13 - Bridge Rehabilitation~|~4A17B9D93C146032260AD153B8426ACDBB6430F5 101569~|~1~|~2~|~02/STR~|~Repair bridge by patching abuments and deck edges using anodes and encasing piers~|~13 - Bridge Rehabilitation~|~739D624BBF7C8C4D5590516813B9F9BAD5E6306F 120571~|~1~|~1~|~01/NHS~|~Plan split for 80/20 items within the NHS portion of the project~|~05 - 4R Maintenance - Resurfacing~|~B933D9A6A4A9172A1B2A25225E0D5CDFAC5BCA6E 120571~|~1~|~2~|~02/NHS~|~Plan Split for the 100% City items on the NHS section of BUT-122~|~05 - 4R Maintenance - Resurfacing~|~E1B18612D8D1F601716F3D9A414D0683DC88FFD1 120571~|~1~|~3~|~03/S5K~|~Plan Split for 80/20 - ODOT/City - the urban portion of BUT-122~|~05 - 4R Maintenance - Resurfacing~|~46E24135F1E855B565AA44FD363750EBCBCE44E7 120571~|~1~|~4~|~04/S5K~|~Plan Split for the 100% Local items on the small urban section of BUT-122~|~05 - 4R Maintenance - Resurfacing~|~C49064ACFEF148B045C6CB7059F0162E435F5079 84597~|~1~|~1~|~01/NHS~|~Resurfacing US422 from SLM 7.61 to SLM 10.14, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~1748CE00D7C9F52757CF328C0E628AD196E8AEA9 110537~|~1~|~2~|~02/S>2~|~resurfacing on the large urban section of BUT-126~|~05 - 4R Maintenance - Resurfacing~|~11F414640CFA3DD89A1AF6050F4C1BB70602D590 110537~|~1~|~1~|~01/STR~|~resurfacing on the rural portion of BUT-126~|~05 - 4R Maintenance - Resurfacing~|~4E57CF0BC68BC3F5712E3CCCB79BC86CE1477C36 120205~|~1~|~1~|~01/SAF~|~Various safety improvements along SR 314~|~21 - Safety~|~E4860DEF31909A464E37B663ACB4031B503A341D 95306~|~1~|~1~|~01/ENH~|~This project consits of the installation of bike lanes on Wayne Avenue (CR 85) and Fourth Street (CR 629).~|~28 - Facilities for Pedestrians & Bicycles~|~61DC79C43EFBBC540ECC13E871F67B38582854C0 110414~|~1~|~1~|~01/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation for various structures along SR 79 and SR 16.~|~13 - Bridge Rehabilitation~|~C4439FBB29C486AF144C4913576400C47A2CE5FD 88939~|~1~|~1~|~01/IMS~|~IR77 24.20-28.37~|~~|~95AA57AB0D57A687778B55D9E0030563B07817AD 88939~|~1~|~2~|~02/IMS~|~Minor rehab > 20' span.~|~~|~477983B12B11A3DF4A11E12B27890FCC0AE5A448 118867~|~1~|~1~|~01/STR~|~Chip sealing SR 799~|~05 - 4R Maintenance - Resurfacing~|~E2969D8EADFC4107A71FB6CF663664FA09DEBADA 113037~|~1~|~1~|~01/S>2/AKRO~|~Resurfacing of SUM SR 261, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~FB81085F01ED3F7B61516746708761161BEEDE51 113037~|~1~|~3~|~03/S>2/NORT~|~Resurfacing, urban paving in the city of Norton.~|~05 - 4R Maintenance - Resurfacing~|~AB87F4C4E8AA976630331BF490E866345E281A59 113037~|~1~|~5~|~05/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~D9D674FFFE00F5A33E5C07203A69FE17EF453250 113037~|~1~|~2~|~02/S>2/AKRO~|~Full and partial depth repairs, ADA curb ramps and guardrail repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~2C50F987A553349D001769B1E7FBAFDADDD8D887 113037~|~1~|~4~|~04/S>2/NORT~|~Full and partial depth repairs, ADA curb ramps and guardrail repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~98807D573A4DF751D0D181DE37F61AFE99EA8788 113102~|~1~|~1~|~01/SAF~|~Safety Sign plan split~|~21 - Safety~|~AC3E46261E4E5C18ECB943170AE7665DD4F6CBF5 125400~|~1~|~1~|~01/IMS~|~Bridge maintenance Interstate~|~47 - Bridge Preventive Maintenance~|~6DD41E4C90417EDC89882CA0B52DCAE0858B77B5 125400~|~1~|~2~|~02/NHS~|~Bridge maintenance NHS~|~47 - Bridge Preventive Maintenance~|~9BBE92A420CC05F721F181B272DF8AE6543F2FF4 125400~|~1~|~3~|~03/STR~|~Bridge maintenance STP Rural~|~47 - Bridge Preventive Maintenance~|~D51A32388305107F7B21495456D630445D9AEA73 87351~|~1~|~1~|~01/NHS~|~Priority system preventive maintenance on COL-30-25.09 to 28.03; includes thin hot mix asphalt overlay, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~8DFC311DE672D4C27FEB17789F9C1447609AC3BE 110102~|~1~|~1~|~01/STR~|~Repair/replace culverts on rural routes.~|~04 - Reconstruction - No Added Capacity~|~4438B477C09F675D1CCA580CCDD0CFDAABA8830D 110102~|~1~|~2~|~02/IMS~|~Repair/replace culvert on Interstate Route.~|~04 - Reconstruction - No Added Capacity~|~DC8DEFF8211BE367D62D833638A3ED3C911DC94E 110102~|~1~|~3~|~03/S5K~|~Repair/replace culvert on small urban route.~|~04 - Reconstruction - No Added Capacity~|~D45B322EDF4E4D803793A1672D768CE230EB1A09 103137~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY21 Construction Engineering Services~|~17 - Construction Engineering~|~BA9C538AB1B0C4AFAD1FFC99C9768F379BA43F6C 103137~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY22 Construction Engineering Services~|~17 - Construction Engineering~|~7EDD77738E60487E2FC9E819FE2168202E855DCF 100826~|~1~|~1~|~01/NHS~|~Rehabilitate bridge GRE-235-1075 by zone painting, replacing bearings, and updating guardrail. Rehabilitate bridge GRE-235-110 by replaing the existing superstructure.~|~13 - Bridge Rehabilitation~|~B309BCE12B7288294825E0640FA88904E9A5D67D 116799~|~1~|~1~|~01/S>2~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~C2057610D32826E2A89986EF76EFF0B0A4CA949B 104679~|~1~|~1~|~01/NFA~|~Bridge ReplacementADA CR 1B 17.28 (0130060)~|~10 - Bridge Replacement~|~58FC3C2DC0F203063484461B0CFAC5C3A79F0082 105182~|~1~|~1~|~01/NHS~|~AC overlay without repairs on NHS route~|~05 - 4R Maintenance - Resurfacing~|~0E4DA9BB5569713BCFE2E09398A12AD2ACB4E220 105182~|~1~|~2~|~02/STR~|~AC overlay without repairs on rural routes~|~05 - 4R Maintenance - Resurfacing~|~18EC74EFACB31C9CEA18703FD5F48396A766E025 98259~|~1~|~2~|~02/ENH/GRAN~|~Construction of multi-use pathway along SR 16/CR 539B~|~28 - Facilities for Pedestrians & Bicycles~|~B254773089E89ED9421E5A40403AFDC2903E72A7 98259~|~1~|~3~|~03/NHS~|~Widening of Roadway and ramps for interchange improvement~|~03 - Reconstruction - Added Capacity~|~9D54417A179ADBDEC301CEDBDC9C6761A1BE2E04 98259~|~1~|~1~|~01/NHS~|~Bridge replacement/rehabilitation~|~10 - Bridge Replacement~|~900F1A42F23B61C77D187AC0758B2C3204B67766 88890~|~1~|~1~|~01/S<2~|~Resurfacing MAH SR 165 from 0.00 to 1.65.~|~05 - 4R Maintenance - Resurfacing~|~571884B53D5AAA46F8109D67DCF2B8C2478979E1 88890~|~1~|~2~|~02/S<2~|~See linked structure.~|~13 - Bridge Rehabilitation~|~3964B3DEC8F14BED47DB99B7EA8B86369BEDAEFD 107731~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - GSM Funds CAPPED at $150,000 - 80% Federal (4SF7) / 20% State (4SS7) - repair of embankment slope near KNO-13-15.19.~|~~|~B6DAD5FE8D2C6FC3E597B80DA75532E66BE3FB14 104662~|~1~|~1~|~01/NFA~|~See linked structure.~|~10 - Bridge Replacement~|~56D7C8D8E381A1212B4A5ED5774F887B47A5F81F 105057~|~1~|~1~|~01/ENH~|~Construction of a 10 foot wide asphalt multi-use trail between US-27 to SR-73 on the southeast side of Oxford.~|~28 - Facilities for Pedestrians & Bicycles~|~65D8D41C15974A623BEDF6F2649337043B342E7C 95434~|~1~|~1~|~01/STR~|~Repair mine subsidence by excavating out unstable material and replacing roadway.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DFFB7E3D48334E9F03B20DE0235FD5D4162DD9BF 92258~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Pavement marking costs for the resurfacing on: 1) Per-SR 37-15.02 to 20.69; 2) Per-SR 13-17.49 to 19.83;~|~05 - 4R Maintenance - Resurfacing~|~4660B406E0794FBE74819EC317AD374CDBBAEA21 92258~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Per-SR 37-15.02 to 20.69; 2) Per-SR 13-17.49 to 19.83;~|~05 - 4R Maintenance - Resurfacing~|~FAF9F2B04DDB445FCBA5165BFFF007BB124F78D2 88826~|~1~|~1~|~01/STR~|~Bridge Replacement - RIC-042-0102 - sfn:7002580~|~10 - Bridge Replacement~|~788FFC539F5A7FC58DDD204B180BE68FB72436B9 116147~|~1~|~1~|~01/MPO~|~Resurfacing Hallett from 5.124 to 5.443 - Pavement, sidewalks, curb, curb ramps, etc. - No Bridge Work~|~05 - 4R Maintenance - Resurfacing~|~371B0FC70C4614EFD2AD3863D8CF16F766E71EC5 116147~|~2~|~2~|~02/MPO~|~Widening of existing bridge over Ai Creek to accommodate pedestrian access.~|~13 - Bridge Rehabilitation~|~A623144BB5495EF6549C323D99FCEB2C8BACB4B6 116147~|~1~|~3~|~03/NFP~|~Plan Split for 100% locally funded scope items, including proprietary products and locally requested drainage improvements.~|~44 - Other~|~E86A0BD4C8F1C50E9F649736834FD138B67226A3 125935~|~1~|~1~|~01/S>2~|~ITS Maintenance.~|~44 - Other~|~1A2EDD65E501E9D2092B64006CDDFF3B4EC44E80 104837~|~1~|~1~|~01/IMS~|~Split for lighting upgrade on the interstate system~|~21 - Safety~|~00FC1D3C5B7728085B76BEF03B811FDAADCB947E 104837~|~1~|~2~|~02/NHS~|~Split for lighting upgrade work on US-422. ~|~21 - Safety~|~F48C3FBDF2D98BE1A4EA5859E3C9131F92974075 119736~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~030B9E1B09A16168D840641972F604C342F55CE5 102825~|~1~|~1~|~01/S>2~|~Applying smooth seal to STP > 200000 routes~|~05 - 4R Maintenance - Resurfacing~|~D4D124C1BAB381B6952B165D3F74C3B2805E6D9A 102825~|~1~|~2~|~02/STR~|~Applying smooth seal to various STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~DE82DE23391AB205BCD32900C5831429D8F0531C 92509~|~1~|~1~|~01/NFP~|~Long Line Pavement Markings in POR, STA and SUM Counties~|~21 - Safety~|~E4AF166116352CF577BA50C6A119C5DBD8BDC63D 119366~|~1~|~1~|~01/S>2~|~Reconstruction & Roadway Improvements~|~05 - 4R Maintenance - Resurfacing~|~3EBB889D6E6D7D2B95FB5CFDBA9E7B0024EAF8B0 126655~|~1~|~1~|~01/S5K~|~Bridge repair~|~13 - Bridge Rehabilitation~|~8260C840B26DC67D93E672AE44C70F8D5AF3EDA5 96253~|~1~|~1~|~01/NFA/BREM~|~"01/NFA/OT/BREM" - Safe Routes To School (SRTS) Funding 4SC7 (80% Federal) / 4BG7 (20% Local) - CAP of $340,000.00 with Toll Revenue use Authorized - Addition of side walks within the Village of Bremen.~|~28 - Facilities for Pedestrians & Bicycles~|~E7677E55E3CE61F9B69D8A0D866E6189A7D6D685 96253~|~1~|~2~|~02/NFA/BREM~|~"02/NFA/OT/BREM" - Safe Routes To School (SRTS) Funding 4SC7 (80% Federal) / 4BG7 (20% Local) - CAP of $1,910.00 with Toll Revenue use Authorized - On-Going Design Services During Construction for Addition of side walks within the Village of Bremen.~|~17 - Construction Engineering~|~38D4E8B113FFADFC8E0195A975D8241D5BB5A614 103710~|~1~|~1~|~01/STR~|~SCI 73 6.38 safety project.~|~21 - Safety~|~0C891288982A9808F60F0CD5F935CBC1D1DA9171 111560~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split for City of Columbus: FRA-710-0.00-1.56~|~05 - 4R Maintenance - Resurfacing~|~9753448DDEF90EA798012BCEEC3CAE1727906758 111560~|~1~|~2~|~02/S>2~|~City of Columbus (100% Work Items)~|~05 - 4R Maintenance - Resurfacing~|~1A182B1F9A3DD460B7DAB193375543529F8868DB 94492~|~1~|~3~|~03/ENH~|~Project includes the reconstruction of the transportation network in the South Fairmount neighborhood of Cincinnati. The project converts Westwood Avenue to two-way from Queen City Avenue, west of White Street, to the Western Hills Viaduct project. Westwood Avenue widens to a seven lane boulevard with walls, sidewalk, and shared use path. The project modifies all side streets on Westwood that are affected by the widening. Queen City Avenue converts to two-way from White Street to Beekman Street.~|~~|~36A2C9691600FBC4C35566991001CE7AE0C974D0 94492~|~1~|~1~|~01/S>2~|~Westwood Avenue: from approximately 500 feet west of White Street to Harrison Avenue Project includes the reconstruction of the transportation network in the South Fairmount neighborhood of Cincinnati~|~~|~6F5A6A85601FF4E67C8089C7375D776CAA3D7FEF 94492~|~1~|~2~|~02/S>2~|~Project includes the reconstruction of the transportation network in the South Fairmount neighborhood of Cincinnati. The project converts Westwood Avenue to two-way from Queen City Avenue, west of White Street, to the Western Hills Viaduct project. Westwood Avenue widens to a seven lane boulevard with walls, sidewalk, and shared use path. The project modifies all side streets on Westwood that are affected by the widening. Queen City Avenue converts to two-way from White Street to Beekman Street.~|~~|~DA2F82B83EF9455E78A331ABA3374292C7ADC6C9 123116~|~1~|~1~|~01/NHS~|~Bridge painting project. HOC 33 10.94 R (SFN 3700577) and L (SFN 3700542).~|~13 - Bridge Rehabilitation~|~2232864DCEDBED163C96D0291E8A46E8050579B7 119920~|~1~|~1~|~01/BRO~|~PROTECT bridge substructures from scour by installing Rock Channel Protection along forward abutment.~|~47 - Bridge Preventive Maintenance~|~17771E1BB9C82B5F2F881BAC19C2329F67F9F5F6 116053~|~1~|~1~|~01/NFP~|~Plan split for bridge operations~|~40 - Special Bridge~|~0CD40C3BF1F17CD9EEEBC25ABD777F53FF75A2A6 84396~|~1~|~2~|~02/S>2/Akrn~|~Construction and reconstruction of sanitary sewer and waterline that is not Federally eligibile. 100% City of Akron expense. In the City of Akron, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~95EB44A50B6C3552D1707EC26709239144930A7F 84396~|~1~|~1~|~01/S>2/Akrn~|~Roadway reconstruction that includes curb and gutter reconstruction, applying pavement markings, installing traffic signals and equipment, in the City of Akron, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~F97156CA88B049FBCA15EB4D7313AD3C6893E26D 125668~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~9BD4484F0C6B8B67049419C4A268570483E432AA 122477~|~1~|~1~|~01/S50~|~All work included in this split.~|~04 - Reconstruction - No Added Capacity~|~8F9DE6A80B615241945D303B7BFE60B1156E347C 108758~|~1~|~1~|~01/NHS~|~Culvert repair project using a liner as the treatment. ATH US 33 8.56-8.59. Funds are 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6810B658AC129C4688E29112147C670D4857D0F 117911~|~1~|~1~|~01/IMS~|~NEVI Phase 1 I-71-D, WAY, MED 204-218~|~63 - Electric Vehicles & Charging Infrastructure~|~E7CDCCD8B1D7D272EFAB262BAC104FC100DFDF41 107803~|~1~|~1~|~01/STR~|~Landslide repair project on ATH SR 329 5.10-5.15. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~60C2CFB149477C58988A05987F0697BE71565E06 118184~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 724 1.10, Structural File Number 6105035. Funded 100% State.~|~10 - Bridge Replacement~|~8237D83BF4380557D0D0A13BDBA0DDEEE2C05CB6 110400~|~1~|~1~|~01/STR~|~Resurfacing SR 212~|~05 - 4R Maintenance - Resurfacing~|~0E7E2987CAEA23F6AAF78BD5217C8E4F42C5BA32 83107~|~1~|~4~|~04/NFA~|~ODNR Public Access Roads 4BF7 (100% State) - No CAP - Resurfacing of drive and parking lot areas within Senecaville Fish Hatchery.~|~44 - Other~|~FA3F71A3DF73DB031B2B85AEBA03FB90D50790DC 83107~|~1~|~1~|~01/NFA~|~District Preservation Pavement Program using 4PS7(100% State) - No CAP - Resurfacing with related work on 1) Gue-313-2.23 to 9.91; 2)Gue-285-8.49 to 9.47;~|~05 - 4R Maintenance - Resurfacing~|~D4C40792567C260E4ED716E46F4F56B2A15C93B6 83107~|~1~|~2~|~02/STR~|~District Preservation Pavement Program using 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Gue-40-16.19 to 16.62; 2)Gue-285-0.00 to 7.92; 3) Gue-285-8.35 to 8.49; 4) Gue-313-9.91 to 11.39; 5) Gue-313-11.39 to 15.02; 6) Gue-313-15.02 to 15.54; 7) Gue-313-15.54 to 20.99;~|~05 - 4R Maintenance - Resurfacing~|~44C19F05C62BFB0191EAF38FD55EB2B1A12133AC 83107~|~1~|~3~|~03/NFA~|~Lands and Buildings District Maintenance Project Funding LBM7 (100% State) - No CAP -Resurfacing with repairs at Old Washington Outpost.~|~44 - Other~|~64371D7991842CA939FB9F6B68E8D52B7D35D142 119950~|~1~|~1~|~01/STR~|~added plan split.~|~47 - Bridge Preventive Maintenance~|~2951B1F0321A5D59FE347DAE1FBC0EDFCC3CFBC9 102501~|~1~|~1~|~01/STR~|~Resurfacing SR 39 and SR 43~|~05 - 4R Maintenance - Resurfacing~|~8EE87C06DBFAACD8DFAE144FA677CB2DD9735ACB 86675~|~1~|~2~|~02/BRO~|~Replace deficient bridge decks with minimal approach transitions. Both structures are part of the I-75/US 35 interchange. SFN 5707595 MOT-75-1180.~|~13 - Bridge Rehabilitation~|~74A79174BC2C4BE424F6008D7264F3B427FF15DA 86675~|~1~|~1~|~01/BRO~|~Replace defiecient bridge decks with minimal approach transitions. All structures are part of IR 75/US 35 interchange. SFN 5707501 MOT-75-1175.~|~13 - Bridge Rehabilitation~|~B10497C18D44FAD62AEF0E7ED19AE084CCB869A8 100911~|~1~|~1~|~01/STR~|~Rehabr or replace various culverts in Butler and Warren Counties.~|~04 - Reconstruction - No Added Capacity~|~A6FB0BDD2FD85CD9C7D1B07904DF8F6BC5712F4A 100911~|~1~|~2~|~02/NHS~|~Repair culverts on NHS route.~|~04 - Reconstruction - No Added Capacity~|~CA3898AEA443688DB6CEF739356019CA62ED695D 100911~|~1~|~3~|~03/S>2~|~Repair or replace culvert on Large Urban route.~|~04 - Reconstruction - No Added Capacity~|~D8AF404C2FAF1CE76F1D8FE894FF7CCF27825184 21631~|~2~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Replace decks, backwall, new approach slabs, paint structure, new expansion joint, replace bearings and railing on: 1) Gue-IR 77-14.74L (SFN 3003248); 2) Gue-IR 77-14.74R (SFN 3003272); 3) Gue-IR 77-15.48R (SFN 3003337);~|~13 - Bridge Rehabilitation~|~6F81F258A4A21C92EF987EDA9A351B476B34569E 21631~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing with related work on Gue-IR 77-11.70 to 17.70~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3A988FF31EB03D264EEBF278EEEEF0AAE569D03C 21631~|~2~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Priority System Deck Sealing on: 1) Gue-IR 77-15.49 (SFN 3003329); 2) Gue-SR 541-08.40 (SFN 3006212); 3) Gue-CR 633-00.68 (SFN 3003213); 4) Gue-TR 8360-00.18 (SFN 3003361);~|~47 - Bridge Preventive Maintenance~|~520AA0EFBB77E6B8A818E8D7E096A8694814AAB1 84449~|~1~|~1~|~01/BRO~|~3602435 HIG SR134 10.6 Intersect: Little North Fork BR Eligible. 80 fed/20 state 01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~953B24378779A82C5D9B5D9238A0F3DEEFE7B523 93941~|~1~|~1~|~01/NFP~|~100% state funds (4mp7) for district wide rpm replacement.~|~21 - Safety~|~0874AEC1FFC5DDCDC578D3E4C4C4C3A9C234DC40 95166~|~1~|~3~|~03/NFP~|~For all non eligible Urban Paving Items (Sidewalks, full depth, curbs,..)~|~05 - 4R Maintenance - Resurfacing~|~3A46360D998EDEB9DBE8B9388E646D85A46A687A 95166~|~1~|~2~|~02/STR~|~SFN:2600919~|~13 - Bridge Rehabilitation~|~B72A8BA29B8BDDB4900025A85BB27999E2CE15F9 95166~|~1~|~1~|~01/STR~|~Resurface FUL-66 from SLM 1.34 to SLM 1.97~|~05 - 4R Maintenance - Resurfacing~|~CA2A7A1BA19C82127C827F100C81525B6BAE9B59 101428~|~1~|~1~|~01/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - Bridge Cleaning and Sweeping on Interstate Routes~|~47 - Bridge Preventive Maintenance~|~E32E10E01047450A56D61739803D74532D1D6C9C 101428~|~1~|~2~|~02/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on NHS Routes~|~47 - Bridge Preventive Maintenance~|~8238F0F858973CE4B4EC1A807A30F951C06C869A 101428~|~1~|~3~|~03/S<2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Urban Routes~|~47 - Bridge Preventive Maintenance~|~89CB16050B63AF37788E468DEBC23DAB45E57796 101428~|~1~|~4~|~04/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Rural Routes~|~47 - Bridge Preventive Maintenance~|~E22EDE31F12BFE6576516C0B171CCA1B4140C53E 101428~|~1~|~5~|~05/NFA~|~District Preservation Bridge Program - 4PS7 (100% State) - Bridge Cleaning and Sweeping on NOFAS-Rural Routes~|~47 - Bridge Preventive Maintenance~|~340601D5A8AEC51CD9E002261CA7D2EE49F3D7DD 79740~|~1~|~1~|~01/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~BE0FC0D550793C686914D9736B421EC5EB35B3BC 79740~|~1~|~2~|~02/NHS~|~Bridge work :RIC-US-30 14.100 (R) - Deck Sealing (051)RIC-US-30 14.110 (L) - Deck Sealing (051)RIC-US-30 17.540 (L) - Deck Patching (Concrete)(049), Deck Sealing (051)RIC-US-30 17.540 (R) - Deck Sealing (051)~|~13 - Bridge Rehabilitation~|~FE223CDE5BB796A74CD856DDA18A7AB540312146 111225~|~1~|~1~|~01/NFA~|~Reconstruction and extension of Bailey Court East Road in Jackson Township, Mahoning County, Ohio.~|~01 - New Construction~|~D48A3D2BE59B37A1AD8D115C694D190953C87437 105428~|~1~|~1~|~01/IMS~|~Plan Split for I670 Bridges~|~13 - Bridge Rehabilitation~|~D047CFCBA69B4CEDD6101D7DE2B411FDF0F424C8 100391~|~1~|~1~|~01/SAF~|~Various intersections.~|~21 - Safety~|~58F77B4082D6D0EC65B537171C8AC4F6E1B33344 105090~|~1~|~1~|~01/IMS~|~Project entails replacing concrete channel protection panels along IR71 Duck Creek.~|~44 - Other~|~EC0A3C3F1E9C06A0A265CCC4752C2C1F5A3C4A16 110644~|~1~|~1~|~01/NHS~|~Resurfacing. Bust in Ellis inventory, SLM 1.83 to 2.64 is actually the General System and is being corrected in the roadway inventory. This is no Urban System on that segment.~|~05 - 4R Maintenance - Resurfacing~|~2EC0615B1F97C6811F7538CDBFD2BBF343DED654 105286~|~1~|~1~|~01/STR~|~Resurfacing SR 9~|~05 - 4R Maintenance - Resurfacing~|~A161C6DB6BD8E7645FE17DAAE77F1F3262C1D80B 124984~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 542 over Delroy Creek.~|~04 - Reconstruction - No Added Capacity~|~6E8B0909FB854BA4C437A607E7F014957F46861B 116091~|~1~|~1~|~01/NFP~|~All work in this project. ~|~13 - Bridge Rehabilitation~|~04D41E95EC71CF64AEEA48CF63014AD4318C44B4 80987~|~1~|~1~|~01/ERD~|~80/20 fed/local split for earmark funds.~|~26 - Ferry Boats~|~48F356018A4378359659669B9C123D7ABAFE33B0 97865~|~2~|~2~|~02/STR~|~"02/STR/OT/ " - Geological Site Management Funding 4SF7 (80% Federal) / 4SS7 (20% State) - CAP $164,000.00 for CO & CE - Backslope Repair on Kno-US 62-22.30 to 22.34~|~21 - Safety~|~574BE2C71503889182D221FDE9F1A2667CB305AF 97865~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management Funding 4SF7 (90% Federal) / 4SS7 (10% State) - CAP $297,000.00 for CO & CE - Backslope Repair on: 1) Gue-IR 77-13.16 to 13.18; 2) Gue-IR 77-19.99 to 20.01;~|~21 - Safety~|~D01A009BEF75926BF1283BD95996C20BF977C08F 114155~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2027.~|~~|~3FBB9300FC89060A269153C509595673E61507C1 100366~|~1~|~1~|~01/NHS~|~SAN-6- 6.78 to 12.99~|~05 - 4R Maintenance - Resurfacing~|~0F4C9D8B62857380A2E33E09502F3815109B5D19 120959~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~D5890CB4D7D6914EB1D6911B8035B8136BD9AF51 120959~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~~|~57E1AC126BCD6F1652090082487728D2D0F0B0B3 120959~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~~|~E587FEB15DF5B24701D15B4F9F37BA9A054A81B2 120959~|~1~|~4~|~04/STR~|~Bridge preventive maintenance 10' to 20' span.~|~~|~696FEE92B65410793A8581590CB1EDEA951F2672 102907~|~1~|~1~|~01/NHS~|~NHS Portion US20A from slm 2.23-3.97~|~05 - 4R Maintenance - Resurfacing~|~80D483587F94F264E005E95C4A0613C2F32DDDD2 102907~|~2~|~2~|~02/S>2~|~Other Federal (non-NHS) portion of US 20A from SLM 3.97-10.27~|~05 - 4R Maintenance - Resurfacing~|~BE7E8E034440792F34ABB0458D7A65F9980508C5 91867~|~1~|~1~|~01/NHS~|~Resurface and perform pavement repair on a portion of SR 32 in Clermont County between I-275 and the eastern Batavia Corp.~|~~|~4674B3EA775032A2CAB2DA9DD9844747B01A4A54 117658~|~1~|~1~|~01/ENH~|~This plan split encompasses all work required for sidewalks and attached curbs through the Village of Portage. The scope includes all necessary roadway profile adjustments to accommodate new curbing, MOT, and related incidentals. Funding is provided through ODOT District Allocation, TAP/Safety, OPWC, and the LPA.~|~28 - Facilities for Pedestrians & Bicycles~|~F6E333B2A234305A38538980BA73BC885AD2130A 24452~|~1~|~1~|~01/BRF~|~"01/BRF/BR/COL" - CR 428 6.65 in St. Clair Twp. - Replace bridge over Little Beaver Creek; relocate ~1400' of roadway both vertically and horizontally, guardrail, signing and striping. All work to be paid for with bridge funds per CEAO.~|~10 - Bridge Replacement~|~1A0E010E095D919997C493C8041D3F5335D54833 117267~|~1~|~1~|~01/NFP~|~Split added~|~17 - Construction Engineering~|~36E119906C2091D081082CA4CD6A7B5F22A8E71C 105545~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the superstructure and abutments on SFN 6403603 Per-SR 669-12.47 carrying SR 669 over Moxahala Creek~|~13 - Bridge Rehabilitation~|~C8CACA7DB0B6B73C448C7EFDD87DF683266C96C2 96643~|~1~|~1~|~01/IMS~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 77 0.00-1.56 Northbound and WAS 77 13.19-17.64 Northbound. IR route funded 90% Federal/10% State.~|~05 - 4R Maintenance - Resurfacing~|~7D656406B13009566BAEA708F2283EA01C2F6DB8 116177~|~1~|~1~|~01/SAF~|~Guardrail upgrades utilizing CEAO HSIP (4HB7) funding at 100%.~|~21 - Safety~|~22802F44909BE141E7CF87C08E080BC9715416F4 84015~|~1~|~1~|~01/BRO~|~Replace superstructure on box beam bridge (BEL-148-1651, SFN 0704334). Substructure units (Pier Caps) will also need to be replaced.~|~13 - Bridge Rehabilitation~|~FF3737BFC72989094E111785D362B2758881E0C7 96822~|~1~|~1~|~01/NFP~|~Two year mowing of interstates and interstate look-a-likes in ATB, MAH and TRU Counties.~|~44 - Other~|~2DB2663D8767E0D117DB7F59875722D12C6972A3 85005~|~1~|~1~|~01/CMQ~|~Plan Split for MAH Metroparks Bikeway Phase 3~|~~|~9090548A6BC0A9457FEACDB2DC58DAEECBEDF4D8 102068~|~1~|~1~|~01/NHS~|~Slide repair~|~44 - Other~|~69613C62AED8BB4C2D4E63D547C7D2F3B76C948A 90938~|~1~|~1~|~01/STR~|~District Allocation~|~10 - Bridge Replacement~|~6A940D21D82950AF44B6D2F1F9FE6DE05CC5DBDC 90938~|~1~|~2~|~02/STR~|~Not project eligible?water service connections which will be reimbursed by the Medina County Water & Sewer District~|~43 - Utilities~|~BFB0D150F570C9007550ED07FA7A81F664FFAD02 101986~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Ashtabula, Mahoning, and Trumbull Counties.~|~21 - Safety~|~6417CCF38985130D493882F527252BE64243C0AF 110967~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 5.64-5.68. Rural federal aid funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~17955D4513F0795E5B5B9C20E1226B7830672168 127022~|~1~|~1~|~01/NHS~|~Noise wall construction.~|~20 - Environmental Only~|~BE09B6E2BF129B1C1B20AD3E1DBF1BA47D2474A5 112294~|~1~|~1~|~01/IMS~|~Bridge Repairs - Patching and encasement of spalled and deteriorated pier columns on structures over IR71.~|~13 - Bridge Rehabilitation~|~9647857D3961ED513511A08CB62D3D82DBB8F66D 119436~|~1~|~1~|~01/IMS~|~Plan Split for the pavement work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7353A69FF7E366D64542DB8C1EE164DBE263C2F 126058~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~45BD3B7AFF2FCC52A1DA7A1320417FBF3E65126D 98314~|~1~|~1~|~01/SAF~|~Flat Sheet sign replacement project in FY2024. Routes and sections in MOE county. Funded 80 federal/20 state.~|~21 - Safety~|~7E8067A3FA4292852BD9ED24C474AFA3FEDF60FF 94359~|~1~|~1~|~01/STR~|~On SR93, 4.49 miles south of the Jackson County line, it is proposed to rebuild and stabilize the existing slope to stop the horizontal and vertical movement.80/20 split01/STP/OT/State~|~99 - State Preventative Maintenance~|~BFD8D06A3C418B548A53D9510F0CEB3A5F536186 118419~|~1~|~1~|~01/NFA~|~Bridge rehabilitation on GUE 761 2.21 (SFN 3006751)~|~13 - Bridge Rehabilitation~|~1E6AACEBD1D21890A9B4938AECC8AFD07DDB4DA4 8936~|~1~|~1~|~01/NHS~|~4800664 LUC US20 11.58 Intersect: Hill Ditch~|~~|~90A04F01744B81A6D60A8519351BEED8D5AC9FB7 101196~|~1~|~1~|~01/STR~|~Bridge work funded with rural STP funds. Funding 80% federal and 20% state funds from the District Preservation Program,~|~13 - Bridge Rehabilitation~|~985E087A425E5EDD5FCDDD4E70D9528C11ABD563 101196~|~1~|~2~|~02/IMS~|~Bridge work on the Interstate. Funding 90% federal and 10% state funds from the District Preservation Program,~|~13 - Bridge Rehabilitation~|~E65D3BBD74935794C00B0E234B3A4B7AB9F614E0 101196~|~1~|~3~|~03/NHS~|~Bridge work on the NHS. Funding 80% federal and 20% state funds from the District Preservation Program,~|~13 - Bridge Rehabilitation~|~9ED5BFC4CBEEB1F19E8A12E44BADA676A5068686 101196~|~1~|~4~|~04/NFP~|~Work on structures that do not meet the federal definition of a bridge. Funding 100% state funds from the District Preservation Program,~|~13 - Bridge Rehabilitation~|~BD015B89F200D4E33C6B479A8A8714790EC892F5 124017~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs ASD-71-0.00 to 8.932 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~76BAB1A1644F18A94ECBC5A26881644770E1BF9C 100931~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete on rural routes: DAR SR 49A SLM 1.84 to 2.87 DAR SR 121 SLM 4.74 to 5.80 DAR SR 726 SLM 4.00 to 4.33~|~05 - 4R Maintenance - Resurfacing~|~EDFC0342F1573D3ED6237FFA51A2B08D54EE29C3 103832~|~1~|~1~|~01/STR~|~Replace turn lane on STP rural route.~|~05 - 4R Maintenance - Resurfacing~|~A5B4DAF25A404BB2EF0AA4AD198F18E018D20C75 107838~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 3.90-3.94. 100% Federal ER funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7B31665D7BF9344621102EA131C9C8CA31DB4AF 105423~|~1~|~2~|~02/SAF~|~Reconfigure the interchange US 35 SLM 18.69 to 19.30~|~21 - Safety~|~A90135E37BE00B5669046E086E3ED0229DC199A4 105423~|~1~|~1~|~01/SAF~|~Bridge repair in conjunction with reconfigure the interchange.~|~13 - Bridge Rehabilitation~|~8CCA135385E102E2BDA4960D140AC0D1C3FA2208 105423~|~1~|~3~|~03/NHS~|~Guardrail repair due to accident.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4CA07F7304FCCA0F085B0B1AEEB5E23E61BFDA1F 82678~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using an asphalt overlay treatment with repair. VIN 32 4.29-7.67. NHS roadways funded 80 federal/20 state.~|~17 - Construction Engineering~|~E290FEA2EF701BA5B7F24E6672BA4796C82DB1F8 87218~|~1~|~1~|~01/NHS~|~Rehabilitate bridges GRE-35-0963L&R (sfns 2900602 & 2900637)over Glady Run by replacing the rigid wearing surface, backwalls, approach slabs, bearings, and other minor rehabilitation items. Rehabilitate bridge GRE-380-0671 (sfn 2902494) over US 35 by replacing the rigid wearing surface, parapets, abutment bearings, and other minor rehabilitation items.~|~13 - Bridge Rehabilitation~|~1373A387883114FAF7235EBDA2AA8E3C9F42A536 115620~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~F91580FEFC2E37207E9517E1E17BE27B7F6FFE7F 101442~|~1~|~1~|~01/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): RIC SR309 SLM 03.910 TO 06.100RIC SR430 SLM 0.000 TO 2.190~|~05 - 4R Maintenance - Resurfacing~|~7A417257F7F71B22A98ED079707BBE90360F9C47 101442~|~1~|~2~|~02/S<2~|~100% Local (Ontario): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): RIC SR309 SLM 03.910 TO 06.100RIC SR430 SLM 0.000 TO 2.190~|~05 - 4R Maintenance - Resurfacing~|~4A46F73461315A385BE88A2F556FFA7BE79EF17F 101442~|~1~|~3~|~03/BRO~|~Bridge Work RIC 309 0558SFN: 7001843Concrete Patching (Non-Deck) Patch and Waterproof underside.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~802096D67DC76FAF4303BEA4A8F41717270D4CC4 101442~|~1~|~4~|~04/MPO~|~Fabric Material used on Ontario Urban paving project paid for with $240,000 4TA7 80%/ 4BG7 20% (RCRPC).~|~05 - 4R Maintenance - Resurfacing~|~C7E8E5DD2C227A667ED4C36A963A5FB8E4196644 86211~|~1~|~1~|~01/STR~|~Replace UNI-4-17.26 bridge8000212 UNI SR4 17.26 Intersect: Blues Creek~|~13 - Bridge Rehabilitation~|~D63F1E2C6924AEF54C1C1F5614528A4B116352DA 86211~|~1~|~2~|~02/STR~|~Culvert split. Replace UNI-4-20.54 culvert:8000247 UNI SR4 20.54 Intersect: Clevenger Ditch~|~04 - Reconstruction - No Added Capacity~|~E86B03702C786DA73FD4CECF152F7A95D7CFB38D 119122~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~BCCFA44AFFE61F7BFC7F7118ACE7A1441CFAE8E2 119122~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~84E1D1AD7E3ACED3568CB9F25E5E533C371A07F0 92225~|~1~|~1~|~01/NFP~|~100% state plan split for all work.~|~44 - Other~|~AEC18BB6E3AED9C6E8D87969E9A21307E81F12C4 104886~|~1~|~1~|~01/NFA~|~District wide Bridge Maintenance project.~|~47 - Bridge Preventive Maintenance~|~8950533F80F4ED93B79C6A42C34F153ABEAB052B 77918~|~1~|~1~|~01/STR~|~Replace the existing concrete slab of Bridge No. CLI-380-0032, SFN: 1403338.~|~13 - Bridge Rehabilitation~|~674B683B2E18297051ABEE9BAEE059F50C28F72C 127134~|~1~|~1~|~01/SAF~|~100% HSIP funding for installation of guardrail on county routes in clinton county~|~21 - Safety~|~60556C88E53B29B008812881C2A9F057F691CC84 107300~|~1~|~1~|~01/STR~|~Split for signal upgrade work at US-322 and SR-608~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~38AEC9F3759529A0E1E01EAF8A7E74E1F9331FCA 124318~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~AAC732F87A7641BBF2BC108F109F45B725432905 104705~|~1~|~1~|~01/NHS~|~District Preservation Culvert Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Culvert replacement at: 1) Kno-SR 13-22.82; 2) Kno-SR 13-22.82; 3) Lic-SR 37-07.08; 4) Lic-SR 37-07.08;~|~04 - Reconstruction - No Added Capacity~|~144567FC2FF55108863E680C7BF8D3EA0445ED6C 104705~|~1~|~2~|~02/STR~|~District Preservation Culvert Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Culvert replacement at: 1) Fai-SR 158-06.17; 2) Fai-SR 158-06.17; 3) Lic-US 62-11.45; 4) Lic-US 62-11.45; 5) Lic-SR 310-11.43; 6) Lic-SR 310-11.43; 7) Per-US 22-08.69; 8) Per-US 22-08.69; 9) Per-US 22-09.75; 10) Per-US 22-09.75;~|~04 - Reconstruction - No Added Capacity~|~AB4200484E277EECB74CB8B93BD1DA3FA771A099 119672~|~1~|~1~|~01/IMS~|~Construct additional lane in each direction~|~~|~5157A20077277A31FF9A24BEBBA7EC87965706A7 106202~|~1~|~1~|~01/NFP~|~Lighting improvements at the MAH IR 680/Meridian interchange.~|~21 - Safety~|~C42A205DEB31312911638916A2E1430C79E7943B 79791~|~1~|~1~|~01/IMS~|~Resurfacing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7FF3731D590476C5C454EE039152690A5B97B770 79791~|~1~|~2~|~02/IMS~|~Bridge Work: MED-71-0.31 (L&R)~|~47 - Bridge Preventive Maintenance~|~4D4B5B63AD9ABAF9D448A4D34DE9435410742266 101650~|~1~|~1~|~01/NHS~|~Culvert Replacement: ASD-250-10.64~|~44 - Other~|~B26C8AD41B26612643A4A8F07227CE1111DA7321 101650~|~1~|~2~|~02/STR~|~Culvert Replacement: ASD-60-12.15~|~44 - Other~|~37357483EF59C190A9DDF78132F46C0BDCEBA7DE 100475~|~1~|~1~|~01/NHS~|~Microsurfacing of BEL-7~|~05 - 4R Maintenance - Resurfacing~|~184E49D5A3A275AC50E2D5BA2C43F06EA460AF02 116931~|~1~|~1~|~01/STR~|~Field pave inverts~|~13 - Bridge Rehabilitation~|~25CD5CA5D112D44CDE69F688FD2B6A00F8493609 120485~|~1~|~1~|~01/S5K/LANC~|~Resurfacing of routes within City of Lancaster~|~05 - 4R Maintenance - Resurfacing~|~7B8AF8AB50753865F7AD8FD2356EF3DF0F89C9A1 116495~|~1~|~2~|~02/NFP~|~Pavement repairs and other 100% city items.~|~05 - 4R Maintenance - Resurfacing~|~751F2AC0D87F688D9D8142BB90E1DE20D346B3E3 116495~|~1~|~1~|~01/S>2~|~Resurfacing-Urban ~|~05 - 4R Maintenance - Resurfacing~|~C07C9CE9B260932DD995776E99A0219BE289D652 116495~|~1~|~3~|~03/S>2~|~Resurfacing on SR 303 in township areas and guardrail Items.~|~05 - 4R Maintenance - Resurfacing~|~2716BEB175097F7C831811007D8155CEB2611D40 102967~|~1~|~1~|~01/STR~|~Microsurfacing on rural routes: DAR SR 121 SLM 9.94 to 14.01~|~05 - 4R Maintenance - Resurfacing~|~B6C43CAAF754DC52228CC9885E54B4436C8D33EF 102967~|~1~|~2~|~02/S<2~|~Michrosurfacing on small urban routes: DAR SR 121 SLM 14.01 to 15.18~|~05 - 4R Maintenance - Resurfacing~|~DC226B44407B4EE043B4E6A75FFE16F04132504C 119923~|~1~|~1~|~01/NHS~|~Project-eligible items.~|~28 - Facilities for Pedestrians & Bicycles~|~62E73B225DBCD144235691933115E9A466C378AE 107228~|~1~|~1~|~01/CMQ/YOUN~|~Upgrade 10 signals within the City of Youngstown.~|~21 - Safety~|~5DB3E0576A7A5420180DD72D0596B443E9BAF0C0 25592~|~1~|~1~|~01/NHS~|~Priority system paving of FAY-35: 17.41-24.02~|~05 - 4R Maintenance - Resurfacing~|~6FB432045A61719CADB0E7C258FF3DC77C696CE6 25592~|~1~|~2~|~02/NHS~|~Bridge work on 10 structures (not BR eligible):2400510 FAY CR138 18.86 Intersect: Over Cr 138 (Bogus Rd)2400529 FAY CR138 18.86 Intersect: Over Cr 138 (Bogus Rd)2400537 FAY US35 20.4 Intersect: Over Shepards Run2400545 FAY 35 1.5 MI E OF ROSS CO LINEIntersect: OVER MILL RUN2400626 FAY 35 0.48 MI E OF SR753Intersect: OVER GROVE DITCH2400669 FAY US35 21.02 Intersect: Over Indian Camp Run2400685 FAY US35 21.02 Intersect: Over Indian Camp Run2400731 FAY US35 22.74 Intersect: Over Mills Branch2400766 FAY US35 22.74 Intersect: Over Mills Branch2401002 FAY US35 20.4 Intersect: Over Shepards Run~|~05 - 4R Maintenance - Resurfacing~|~99E70138DDF4E12129EB27EF3FC9A07819C50D14 12343~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all bridge work using federal IM funds: 1811797, 1811827~|~10 - Bridge Replacement~|~01D00B9BAAA304336CCF640868FA48F77543E521 12343~|~1~|~2~|~02/IMS~|~90/10 fed/state funding split for work pavement work using federal IM funds.~|~10 - Bridge Replacement~|~4DB8CA469A44938AD55752CB4B44606F03F12472 116476~|~1~|~1~|~01/S<2~|~Overlay in Ross County.~|~05 - 4R Maintenance - Resurfacing~|~451257487C05FCA77BAC39C5DD4A156887B33667 114574~|~1~|~1~|~01/BRO~|~OH Share~|~47 - Bridge Preventive Maintenance~|~2C78C9AA6A0B3C07A4EEBB0376EB421B13BB59E0 114574~|~1~|~2~|~02/BRO~|~WV Share of the bridge Clean & Paint~|~47 - Bridge Preventive Maintenance~|~D5B3F79889D6C596ADC500DE9543EF2ABAE3D458 95823~|~1~|~1~|~01/S<2~|~from SLM 8.30 to 10.44~|~05 - 4R Maintenance - Resurfacing~|~FCCC61CC8BCCEA87147FD3061E32FD0571886517 105237~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3C2DBB0599BAE7004922C5921C2CDA679E1EA39A 114483~|~1~|~2~|~02/S>2~|~Split for urban STP paving~|~05 - 4R Maintenance - Resurfacing~|~F5CB0FE4760C5A47CF958497D3B901FA97898B8B 114483~|~1~|~1~|~01/IMS~|~Split for various pavement repairs on interstate.~|~05 - 4R Maintenance - Resurfacing~|~2474DCD984EBB29AC7965FA6429D4465E7944C09 114483~|~3~|~3~|~03/STR~|~Resurfacing both shoulders on SR 168, 1.5? mill and fill ~|~05 - 4R Maintenance - Resurfacing~|~1ABB1900924E3603E3F44910830379C88922E3AC 98365~|~1~|~1~|~01/NHS/BARB~|~Resurfacing Wooster Road from Hopocan Ave to Norton Ave in the City of Barberton, includes full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~E364C8AA3E55F5A2FC414E594F7CC6FF6BC1DB1E 114536~|~1~|~2~|~02/IMS~|~Plan split for application of protective coating to SFN 1814249~|~47 - Bridge Preventive Maintenance~|~97F34CD0BD7853C22FA06EF73264CF4DA5A000A1 114536~|~1~|~1~|~01/BRO~|~Split for bridge replacement work~|~10 - Bridge Replacement~|~DE65BC81552204BDC75B180AF9D4A9EEA59D8E23 117527~|~1~|~1~|~01/NFP~|~Plan Split to resurface roads inside East Fork State Park ~|~05 - 4R Maintenance - Resurfacing~|~7E0DC7C4DC0BE1C94B1C189B77B56047EA518062 122821~|~1~|~1~|~01/MPO~|~80/20 split, 80 %OKI CR Funding with 20% LNTP using TRC. Construction phase is capped at $443,971.00.~|~~|~962F278A7B16B5546EA23DA1786507442AED5695 121323~|~1~|~1~|~01/NFP~|~Created for TID Involvement~|~44 - Other~|~C3A9EDABF22F5E69FB607AF77BBF96067F430FCC 117451~|~1~|~1~|~01/NFP~|~Plan split for repairing GR in D6 in all counties, besides Franklin.~|~21 - Safety~|~AF614DA2D832F57853B25D2AB3326C699C91EE20 114393~|~1~|~1~|~01/MPO/FAIR~|~Improvements to South Gilmore Road between Mack Road and Planet Drive, including addition of a southbound lane between Flaig Drive and Resor Road.~|~21 - Safety~|~9DF490A7CE4E77B749503FE27778CF1D416FECE7 113766~|~1~|~1~|~01/NFP~|~ODNR Barnesville District Office parking lot paving~|~05 - 4R Maintenance - Resurfacing~|~068158C849117E45646FFAEC89E130A711569051 109807~|~1~|~2~|~02/SAE~|~Adding edge line rumble strips to one section of roadway on the project. Funded 100% with safety funds. ~|~21 - Safety~|~F20EE76C3250D7A88F432500C45BE36CE3F612A7 109807~|~1~|~1~|~01/STR~|~Resurfacing on SR12, SR 613, and SR 115 using district preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~4DF4426A9537E861CA6E899989C3032BEF0F99DD 93297~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~0A2033026A3DBE82C98937102A0133B58183E001 94198~|~1~|~1~|~01/STR~|~General system paving on UNI-42, SLM 0.00-9.89~|~05 - 4R Maintenance - Resurfacing~|~3AAD899B3D4B83E4282821BDFCEE8B74EF63BB57 98383~|~1~|~1~|~01/NHS~|~Resurfacing STA SR 43 from 25.00 to 27.20.~|~05 - 4R Maintenance - Resurfacing~|~ADA1410A8E8737978B7905E4BE9D8D64A636AA0E 98383~|~1~|~2~|~02/NHS/CANT~|~Resurfacing STA SR 43 from 12.70 to 14.41, urban paving in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~73574A7B94727737111814107FCD821068836CF8 98383~|~1~|~3~|~03/S>2/CANT~|~Resurfacing STA SR 172 from 14.86 to 15.55, urban paving in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~D68EBB4A104BA01CA162DD43FC5AD5D3F4D9A3F5 98383~|~1~|~4~|~04/S>2~|~Resurfacing STA SR 619 from 0.00 to 2.06.~|~05 - 4R Maintenance - Resurfacing~|~5CFB38969183B914F0724B982DA4DC2B6E679F24 98383~|~1~|~5~|~05/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~79402E9A6353169CFA1B0785CBFA4B37B7AE1E39 98383~|~1~|~7~|~07/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~C0A7E43044A5D24A1825C8CF8F31C8C62C269D87 98383~|~1~|~6~|~06/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~59A7E85E55159DB818CF4B6888445C24ED14DD9E 98383~|~1~|~8~|~08/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~0AE0FF8C0AB07C2039B03D662AEE19B8B892C3AD 98383~|~1~|~9~|~09/NHS/CANT~|~100% City of Canton items STA SR 43 from 12.70 to 14.41 including curb ramps, catch basins, and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~955497BFFBE8ACEC92A300DE3D03D98D07061CB6 98383~|~1~|~10~|~10/S>2/CANT~|~100% City of Canton items on STA SR 172 from 14.86 to 15.55, including curb ramps, catch basins, and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~B79F2B8E09A8BBDCDC92A4A561D5242732C5FFEC 98383~|~1~|~11~|~11/SAE~|~Adding rumble stripes.~|~21 - Safety~|~B9C453DE15D4CBF5BDDB8447973B54F5F1C30EFE 96224~|~1~|~1~|~01/STR~|~From SLM 2.46 to 3.05 then from 3.59 to 5.07~|~05 - 4R Maintenance - Resurfacing~|~51152844A6BAEC6B9BDDAD10192230EC86B70ED7 117073~|~1~|~1~|~01/IMS~|~Split for bridge work over the interstate~|~13 - Bridge Rehabilitation~|~2C69E54E4B107D4B2F7BD64753C293733FE21997 86052~|~1~|~1~|~01/ENH~|~"01/ENH/OT/HCPD" -Construct ~7.65 mi of bikepath including bridge rehab/reconst. From CR 25 in Glenmont to Railroad Depot at CR 622 in Killbuck. Includes a parking facility near Killbuck. Will use earmark funds (OH384) for design. Trail will be 16' wide, plus 2 foot shoulders. Phase 5 B is PID 85365.~|~28 - Facilities for Pedestrians & Bicycles~|~FD290AEABBFE9037A74A5E9149BB6904F4514558 95549~|~1~|~1~|~01/MPO~|~MORPC/Columbus funding for widening of Polaris Pkwy~|~03 - Reconstruction - Added Capacity~|~3E40653F643E0F061778B98540C41F4C111C75F5 104020~|~1~|~1~|~01/ENH~|~Rehabilitation of the Knowlton Covered Bridge off of MOE TR 384A, that spans the Little Muskingum River. Funded 80 federal/15 TRC/5 local.~|~40 - Special Bridge~|~EEEE3025729B6E120AA1BFA3A12D6A75D37CC37D 108555~|~1~|~1~|~01/NHS~|~Rehabilitate structure carrying US 30 over Westfield Rd by replacing the superstructure.~|~13 - Bridge Rehabilitation~|~A2CE9A22628BBC988A520D87FC594E0C54AD7D91 121747~|~1~|~1~|~01/ENH/AKRO~|~Construction of a shared use trail.~|~28 - Facilities for Pedestrians & Bicycles~|~F15A70F3313719B0BCF3AEC68A1B9780903EE938 126804~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~C19C57814BE5C562DAA9CA7374093BE63CB62FA7 111165~|~1~|~1~|~01/NFP~|~Resurfacing at Fayette Deer Creek State Park~|~05 - 4R Maintenance - Resurfacing~|~689A0EE764E2A246DB04196690D06F1503959892 111165~|~1~|~2~|~02/NFP~|~Resurfacing at Stage's Pond Natural Preserve~|~05 - 4R Maintenance - Resurfacing~|~E6EF0E7DFA6170E169C7FCCE56C6141EA28CD153 99545~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~491F195A59B01591637584B0D7CEE09ADD3201B1 119709~|~1~|~1~|~01/NFA/SHAW~|~Removal of structure (SFN 6460102)~|~40 - Special Bridge~|~4BB939FBA60D710DA004C8EC0D25E6E19328D1A8 83035~|~1~|~1~|~01/IMS~|~Plan split for Paving of SUM IR 76 0.00 to 6.31~|~~|~4C76498D15C82CF369A9F119E13A99A558A5F9F1 83035~|~1~|~2~|~02/IMS~|~Plan Split to cover pavement markings.~|~~|~CE5ABB5A9D3CDB279AFBAED4EA1E76E5A3C4EB65 86930~|~1~|~2~|~02/S>2~|~Resurfacing of SR-261 from SLM 3.51 to SLM 3.85 and SLM 4.13 to SLM 5.06 in Franklin Township, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~09606F9EE60EFE631AF73DDB94318092D81E26CA 86930~|~1~|~1~|~01/NHS~|~Resurfacing of SR-59 from SLM 5.86 to SLM 6.83 and SR-43 from SLM 13.21 to SLM 15.59 in Ravenna and Franklin Townships, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~3F76A3BB84F3B538E43DA483B501BC328AB4BE71 86930~|~1~|~3~|~03/S>2/KENT~|~Resurfacing of SR-261 from SLM 3.85 to SLM 4.13, in the City of Kent, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~4C80EF490A0B93ED8C99D4CCAE5A61F4D6B3C4E9 86930~|~1~|~4~|~04/BRO~|~Rehabilitation of SFN# 6701264, POR-SR43-14.31 over Norfolk Southern Railroad.~|~13 - Bridge Rehabilitation~|~875BE47E9CFA18868485AE7EACF861DA01B98F2F 86930~|~1~|~5~|~05/NHS~|~Bridge rehabilitation of SFN# 6701841, POR-SR59-6.05 over Norfolk Southern Railroad, and SFN# 6701213, POR-SR43-13.90 over abandoned Railroad.~|~13 - Bridge Rehabilitation~|~F6B82CC3BF0F9CD48F9BEC362829DCD31CA2B25D 86930~|~1~|~6~|~06/S>2~|~Rehabilitation of SFN# 6705111, POR-SR261-4.03 under Bikeway Bridge.~|~13 - Bridge Rehabilitation~|~FEA04196C4E5FB5AE6420E5D50AB3E610564B7A5 126659~|~1~|~1~|~01/ERD/AKRO~|~Reconstruction.~|~04 - Reconstruction - No Added Capacity~|~2553F0C62511D51C0C3544F7509E0EE5E43AE528 101208~|~1~|~1~|~01/NFP~|~"01/NFA/OT " - District preservation block PID - 4PS7 (100% State) - Block PID for Construction Inspection costs.~|~17 - Construction Engineering~|~07800D58FD19DB4DC2D1078D46BCB966D69C8D20 122012~|~1~|~1~|~01/SAF~|~Roundabout at West Chester Rd and McCauly Rd~|~21 - Safety~|~1A04D20ECD8C9356231B94170BD9DD0FEB0833C0 126090~|~1~|~1~|~01/BRO~|~Plan split for all work associated with SEN-18-1424~|~47 - Bridge Preventive Maintenance~|~2E8BA6957BEAAE220D3FC3FD781D6AF58E709125 117684~|~1~|~1~|~01/MPO~|~Plan Split for MPO Enhancements funds~|~28 - Facilities for Pedestrians & Bicycles~|~854EEBF48E605CFEA3D736FB8A1D7F5FFC75FAB1 93254~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehabilitation on 1602586 COS SR621 1.92 Intersect: Spoon Creek; Not BR Eligible for Rehabilitation: Length=17 SD/FO(1) SR=71.2 DSR=" "~|~13 - Bridge Rehabilitation~|~D83158217C451A0EB4FA8DFAB4C9C3CD6A6F4BCB 121084~|~1~|~1~|~01/NFP~|~PM FY2029 plan split.~|~21 - Safety~|~36D4E81D0DBFBCE1821CDF5E62FD97A405FE526C 115391~|~1~|~1~|~01/IMS~|~Project Development Process for the currently unused weigh stations in District 3 ASD-IR-71 11.64 / MED-IR-76 05.19~|~04 - Reconstruction - No Added Capacity~|~9A95497ACF2F306C5C98048C4693D96FBA6136B3 109014~|~1~|~1~|~01/IMS~|~Repair deck edges to connect L&R structures~|~13 - Bridge Rehabilitation~|~F1F5E0DA8C4D1E9B1EA208EF1CAED9E5D990FF97 109014~|~1~|~2~|~02/SAF~|~Improvements to EB on and off ramps and signal upgrades. Extend sidewalk south to connect to sidewalk constructed by Columbus' Hamilton Rd project.~|~21 - Safety~|~2BE5454545F4D8B64FFD987446F1B11824D42CEF 109014~|~1~|~3~|~03/NHS/Cols~|~Items to be funded 100% by the City of Columbus~|~21 - Safety~|~6F35EFB241EFE3123DFD8E35828A549ACDDE0878 117328~|~1~|~1~|~01/S5K/MCEO~|~Replacement of MUS-TR 297-0.42 (SFN 6040241) carrying Adams Lane over Joes Run~|~10 - Bridge Replacement~|~FBDF78E9CC985C131E6B80A2FDF2C4543C80E4DC 102337~|~1~|~1~|~01/NFA~|~Replace deficient county bridge.~|~10 - Bridge Replacement~|~7CC5B5103572574D6A0BC5ADD73B237F9C337BE3 105240~|~1~|~1~|~01/NFA~|~The LEDC will construct a 3180 linear ft access road with two 12 ft lanes from CR1 through greenwood property northerly to connect to the former Dow site.~|~01 - New Construction~|~1C6C78E3F315029752F50AC0173EB658A44DDDBA 113006~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs on the interstate bridges~|~13 - Bridge Rehabilitation~|~0EC896E98D638324AE2EBCA416DB0E37168224C7 113006~|~1~|~2~|~02/NHS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs on the NHS bridges ~|~13 - Bridge Rehabilitation~|~8A2F1F614D85307CF108913492456D8B6E91C7EC 113006~|~1~|~3~|~03/IMS~|~Recent bridge hit repairs on HAM-75-1642E from 1-15-2025 accident.~|~13 - Bridge Rehabilitation~|~A452C1346D9DC0C8382EEFBC815E13935A849153 96214~|~1~|~1~|~01/STR~|~STP Rural 80/20 Fed/State MAR-231-1.04 over Owings Ditch~|~~|~10BB6B227500D8ECA9CC0EDC920CD09F21CC41F3 97506~|~1~|~1~|~01/BRO~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). On the federal aid system. Functional Classification Major Collector. CR 222 (Napoleon Road) Bridge SFN 0238872.~|~10 - Bridge Replacement~|~A7C6642A3C6322208E4DDAFC78AF84630493F3E9 97506~|~1~|~3~|~03/BRF~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). Off the federal aid system. Functional Classification Local. TR 108 (Neely Road Bridge) SFN 0232505~|~10 - Bridge Replacement~|~BE9CC6217E027D20D5E7768D33B05E9DC898B3CC 97506~|~1~|~2~|~02/BRF~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). Off the federal aid system. Functional Classification Local. TR 87 (Hook Waltz Road) Bridge SFN 0243329.~|~10 - Bridge Replacement~|~E780CF9611D310364EEE71B65B685714F14632D0 123014~|~1~|~1~|~01/NFP~|~Systematic sign upgrades/replacements on various routes throughout District 4.~|~21 - Safety~|~11B5647D84A1A08CEBDEE412FBFB9A7CA67FD117 123306~|~1~|~1~|~01/S>2~|~Ped/Bike path~|~28 - Facilities for Pedestrians & Bicycles~|~F6D5A19A7C595DF819947E3C710FD507A8FD5779 119772~|~1~|~1~|~01/SAF~|~Curb bump outs and other safety improvements along Ross Avenue~|~21 - Safety~|~A4AA396089FD66967C88CF522D2AABA612D85135 109785~|~1~|~1~|~01/STR~|~Districtwide culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~E33631573E0DC388F3CD318B9940AAB190FB666E 114838~|~1~|~1~|~01/S5K~|~Resurfacing; US-36 SLM 13.375 - 14.134 (Marysville Corp) (Urban Paving within City of Marysville)~|~05 - 4R Maintenance - Resurfacing~|~73E044842FBB347278AB935BB83FF72D39193166 114838~|~1~|~2~|~02/S5K~|~Resurfacing; US-36 SLM 14.134 (Marysville Corp) - 15.557 (Mackan Rd) (Marysville Urban Area outside Corp Limits)~|~05 - 4R Maintenance - Resurfacing~|~2DD769A2589D1576EDF540E2AE44E52ADECE65CB 114838~|~1~|~3~|~03/STR~|~Resurfacing; US-36 SLM 15.557 (Mackan Rd) - 18.930 (Delaware County Line) (Rural Area)~|~05 - 4R Maintenance - Resurfacing~|~87E4533D8E334E5225D86914837050FD38BBCAFF 114838~|~1~|~4~|~04/S5K~|~100% City of Marysville (Rejuvenator/Repairs); US-36 SLM 13.375 - 14.134 (Marysville Corp) (100% City of Marysville Items)~|~05 - 4R Maintenance - Resurfacing~|~A390EFBFEAB0F13597A58A84006F42F293309FEC 96273~|~1~|~1~|~01/NHS~|~District Allocation 80/20 - Bridge Repairs~|~13 - Bridge Rehabilitation~|~D20FCBB136883899BBB2C526CE1078FA5DB03191 120883~|~1~|~1~|~01/STR~|~Plan split for federally eligible DBT costs~|~10 - Bridge Replacement~|~6CDAD4AE919ACCEFDCE865C8FFD093C0ADF7D6FE 123700~|~1~|~1~|~01/STR~|~Plan Split for the Rural Locations~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8FA75FB0E061EF9D8E72318406CB7D2165626351 97939~|~1~|~1~|~01/S<2~|~Installation of turn lanes, signals/signal upgrades and mill & fill on SR 39 (Mansfield Ave).~|~21 - Safety~|~04A2AC77335C4100763C56A5192FB3031B6F7E3A 97939~|~1~|~2~|~02/S<2/Shel~|~Pavement widening, installation and upgrade of signals.~|~05 - 4R Maintenance - Resurfacing~|~BED6C4B1BAA2D34C067718D10074D21DF57CFEAA 97939~|~1~|~3~|~03/S<2~|~Paving outside of the Shelby City Limits.~|~05 - 4R Maintenance - Resurfacing~|~7A45136A26646ECFB134565A5457BB9C14379C0D 97939~|~1~|~4~|~04/S<2~|~100% local items.~|~05 - 4R Maintenance - Resurfacing~|~6CAA5865E473188173899C851C9CCA86F82CAC14 97939~|~1~|~5~|~05/BRO~|~Bridge items, 80/20 Fed/State.~|~47 - Bridge Preventive Maintenance~|~2339C285D74548344CD4A6507DD5F6808F974D47 94084~|~1~|~1~|~01/IMS~|~Patch abutments using anodes on SFN 5501989 over Stanley Rench Ditch MIA 75 0623R, and Reface abutments using anodes on SFN 5502314 Over Peters Creek MIA 75 0793R.~|~13 - Bridge Rehabilitation~|~33332FE5D918725A089DCF4A393CC648ED3F5380 98648~|~1~|~1~|~01/SAF~|~RPM.~|~44 - Other~|~F2081799D36CE7CABF722E874C86A9367C308257 88417~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 4.81 (SFN 5301149), 4.85 (SFN 5301173) and 5.31 (SFN 5301203). Rural other federal aid funded 100% state.~|~10 - Bridge Replacement~|~85362267B3FB96FF2E420B7C363413F3A1FDA0CC 108584~|~1~|~1~|~01/IMS~|~Plan split for reconstruction including drainage replacement and pavement work.~|~04 - Reconstruction - No Added Capacity~|~BCCF2B6A7430EFE88871F3E9EAB273C2549A4782 108157~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAR-4D-0.00-1.43 MAR-309-15.35-15.80 & 17.25-17.57~|~05 - 4R Maintenance - Resurfacing~|~85007C7D8AB89D520CF0B44307BCAC3282EB8315 108157~|~1~|~2~|~02/S>2~|~MPO should be split #2~|~05 - 4R Maintenance - Resurfacing~|~807512D5D0BE873C39B80A37602EF8D9A7367F0B 108157~|~1~|~3~|~03/S>2~|~Adding CE split 2~|~~|~553AA30C235554D3C4569DD6D070890090967239 96254~|~1~|~1~|~01/S>2~|~Widening consisting of revising the existing roadway from 2 lanes to 3 lanes. An 8' sidewalk/bikepath will be constructed on the north side of the road along with burb on both side and storm sewer as needed. Also, the vertical alignment of the roadway will be adjusted to eliminate a low area in the pavement. Chambersburg Road.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C3C349543BEBCC0C1CB97C205503570FB9422E2A 90631~|~1~|~1~|~01/NFP~|~This is a barrier sweeping contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9B4C654F5D7CE38A56B10993D101D18170AF2AD4 100018~|~1~|~1~|~01/MPO~|~Wayfinding Signs on Various Streets in Sandusky~|~21 - Safety~|~6B475A65C4D27E8F33F3E876B337C83546E08F14 105355~|~1~|~1~|~01/NFP~|~Spot paving various locations throughout District 11~|~05 - 4R Maintenance - Resurfacing~|~5FD12C8BE3F985E87330C49E9FA777B0BDFF379D 82309~|~1~|~1~|~01/IMS~|~Phase 2 work for the I275/SR32 interchnage. Include flyovers to complete the freeflow movement for eastbound SR32~|~~|~1A8960287B1DB0E8F08FFE4A107FF961D6E3A024 82309~|~1~|~2~|~02/IMS~|~Major New project Complete construction of Phase 2. Primarily IR275 to eastbound SR32 and southside of Eastgate Blvd interchange.~|~~|~40380B8C486B9E49B36BF413E632D66A2D8BABCA 90393~|~1~|~1~|~01/STR~|~Bridge deck replacement on WAS 26 1252 (SFN 8400962). Work includes superstructure and substructure repairs. Federal 80%/State 20%.~|~13 - Bridge Rehabilitation~|~AC7C501F3E62ABB9F476A69203C1C71D79D851C2 117659~|~1~|~1~|~01/IMS~|~Rehabilitation of interstate culverts~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B83E6F437EA23732FA779139DB24067386AFDADA 117659~|~1~|~2~|~02/NHS~|~Rehabilitation of culverts along NHS routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~69312A33F7C2091F233D4BEDAD38197D46E11D15 117659~|~1~|~3~|~03/STR~|~Rehabilitation of culverts along STP Rural routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ECF4737CAEF970CC1798F650C81D87B232E5B4BE 93046~|~1~|~2~|~02/S<2~|~Resurfacing project on CR 5-0.00 to 0.27, 0.29 to 1.43. Berm work and striping also included. Urban other federal aid funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~47113401F8BF8A4F8CE00F2247EEFCE85FB49AF2 93046~|~1~|~1~|~01/STR~|~Resurfacing project on CR 1-3.74 to 15.46, CR 3-7.17 to 13.56, CR 5- 1.43 to 1.66, 1.67 to 2.25, CR 28-7.40 to 10.53, CR 33A-0.00 to 3.40, CR 41-0.00 to 0.91, CR 42-0.00 to 0.54, and CR 124-0.49 to 0.83 Berm work and striping also included. Rural other federal aid funded Federal 80% and 20% Local.~|~05 - 4R Maintenance - Resurfacing~|~962A50F0EC0C3B0337F2D082E64F8CA3C4489F68 93046~|~1~|~3~|~03/NFA~|~Resurfacing project on CR 41-0.91 to 0.93 and CR 124-0.83 to 2.86. Berm work and striping also included. Not on any federal aid system. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~CE91A3438017B49EAAF9E3AA0FE6A261EF27CAB2 111852~|~1~|~1~|~01/BRO~|~KYTC's Share of the painting project.~|~13 - Bridge Rehabilitation~|~C9D5E81671C8C5FA2F7D2B233E647B22EB421FAA 111852~|~1~|~2~|~02/BRO~|~OH's Share of the painting project.~|~13 - Bridge Rehabilitation~|~72CD726850F3A96CFCFCC8F348464982026C0F91 87718~|~2~|~2~|~02/IMS~|~Rest Area~|~44 - Other~|~8DE4BFF3B39E9C42D2C2B9694123FD164D6E2356 87718~|~3~|~3~|~03/IMS~|~Bridge Work.~|~13 - Bridge Rehabilitation~|~01605D8C3D774021B2022EF74FE7A01939C4A5FD 87718~|~1~|~1~|~01/IMS~|~District Allocation 90%-4PF7 /10%-4PS7 Funds.~|~05 - 4R Maintenance - Resurfacing~|~AE3D64B96999823EB539E965298E8E54F5536EA2 85342~|~1~|~1~|~01/ENH/Geto~|~On Court House Square, on Apple and Cherry Street, it is proposed to construct a street scape in FY2011. 80% fed/20% local on first funding event & 100% local on 2nd funding event.~|~30 - Scenic or Historic Highway Programs~|~A1224EDEDDEF089DE44B96E7C6741E7BD5442342 92338~|~1~|~2~|~02/NFP/DEF~|~A City of Defiance Monument Sign paid for 100% by the City of Defiance. There is another City of Defiance Monument Sign that will be paid for by the TE program and in in the other split.~|~31 - Landscaping & Other Scenic Beautification~|~8545BE0BB9C868AB3FE622BBFB4646AFBB5E3522 92338~|~1~|~1~|~01/ENH~|~01/ENH/OT/ This Plan Split is for work funded through the ODOT Central Office controlled Transportation Enhancement Program.~|~31 - Landscaping & Other Scenic Beautification~|~BBDD3A4DCC31CAFFB0D0409F9C7EB8E0F4302073 100156~|~1~|~1~|~01/NHS~|~Adding Lighting and sidewalks to US 422 and SR 616 in Coitsville Township.~|~28 - Facilities for Pedestrians & Bicycles~|~77E07B18AF9BB89919A6D73EF61C4BD7D864D073 115209~|~1~|~1~|~01/NHS~|~AC Overlay w/o Rpr WAY US 250 12.26 - 14.08.~|~05 - 4R Maintenance - Resurfacing~|~BF8275E45C23DBC8FC625284EE8B7D9682E414C9 91026~|~1~|~1~|~01/MPO~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6DC365A20B1AC7FEE989AC773B57A5DF61A721FA 91026~|~2~|~2~|~02/SAF~|~Turnpike Mitigation Work~|~47 - Bridge Preventive Maintenance~|~2DB8937305272AA2D185343B2762D6577CCF1EE4 104080~|~1~|~1~|~01/BRF~|~Bridge replacement on CR 78 (Kennard)~|~10 - Bridge Replacement~|~4DA35C139F3A1532A5872338FB82B89ED9806DD9 123730~|~1~|~1~|~01/IMS~|~Plan split for resurfacing on WOO-75~|~05 - 4R Maintenance - Resurfacing~|~AD663EED929531004796D4F13EFB02E10638B0BA 110514~|~1~|~1~|~01/S>2~|~Resurfacing Walbridge Rd.~|~05 - 4R Maintenance - Resurfacing~|~EA9729683F704D69C99FD3C7C1DE3D1630F52D8D 110514~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~1EF036D27A09ED27001824BD56AB5D2B4FADFF15 102496~|~1~|~1~|~01/STR~|~1" FGP overlay of CAR-212~|~05 - 4R Maintenance - Resurfacing~|~1D2498EDFFA8DAE791FB27C05AF6A05A87B5EC4B 114277~|~1~|~1~|~01/IMS~|~Mowing contract in District 8~|~44 - Other~|~3846BCA9E81C220D8FA0E2BFD07A6BE8745435C2 123482~|~1~|~1~|~01/NHS~|~Resurfacing project using a fine graded polymer overlay. MRG 60 3.34-9.36.~|~05 - 4R Maintenance - Resurfacing~|~B63A04FB9D7404F40BA23D4D9E7DEE393035C2EF 124934~|~1~|~1~|~01/MPO~|~resurface West Kemper Road between Mill and Winton Roads~|~05 - 4R Maintenance - Resurfacing~|~D03EA06B3997C3F70A8E7CB5D7705D886A9D9116 123923~|~1~|~1~|~01/MPO~|~Resurfacing of Dayton-Xenia Road from Trebein Road to the western City of Xenia corp. limit.~|~05 - 4R Maintenance - Resurfacing~|~925A054762DAEDE669B413BB9710BCDAF4229D3D 83201~|~1~|~1~|~01/S<2~|~Project consists of widening of Park Avenue from Main Street to Lexington Avenue to accommodate 13 foot lanes; work also includes curb and gutter, storm sewer, sidewalk, railroad signal work, water main work and 100% City sanitary sewer work.~|~04 - Reconstruction - No Added Capacity~|~4C973FCFD4908B1FD237EDC5308BDD3670A3F280 83201~|~2~|~2~|~02/NFP~|~Non-Federal aid items as per plan~|~04 - Reconstruction - No Added Capacity~|~77412C2F6B8603435BCEE516F4B624879FB7A507 104816~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~83470B9DE6E5227707FBC6F784CD37928CFBBE82 96679~|~1~|~1~|~01/IMS~|~Minor bridge work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~624383A5F7BF31D63D8124D57FA41D9D88546D80 96679~|~1~|~2~|~02/S>2~|~Minor bridge work to the linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~53643E0E2B2CF4ADE42E4024F016D82BB4836620 120699~|~1~|~1~|~01/IMS~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5B88FAD4581ED6CA0BEC06E563A1F4F8851A2FE4 107828~|~1~|~1~|~01/STR~|~DEL-47~|~05 - 4R Maintenance - Resurfacing~|~FD26DDE7FAB9F1C5D2994E3DE8114A3453890C40 107828~|~1~|~2~|~02/NFA~|~DEL-229IC~|~05 - 4R Maintenance - Resurfacing~|~7970A91280965824602C1167C5D81D86948E800E 119634~|~1~|~1~|~01/SAF~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~C12CB987AC55D1A1A78CC1ABA379E8527C667733 121588~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1E0CE597AE64E8A9C77B094CEE9127A508230706 112180~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance.~|~17 - Construction Engineering~|~9D4CE352EF3F519CC0BE25B8D2F8F5E1666F4B4E 112180~|~1~|~2~|~02/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~8911FBDE478F7FD588613D182966B3DA204AA12E 112180~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~17 - Construction Engineering~|~75F15C0F0FB6522CB2FCBBBBD3953BAA7F7E41C2 112662~|~1~|~1~|~01/SAF~|~Replace span wire traffic signal with mast arm supports and vehicle signals with back plates, update pavement markings and signs.~|~21 - Safety~|~9176B2CC37B0E63C7B525F6B1A54D37B29525FF7 91391~|~1~|~1~|~01/S<2~|~Urban paving in Marysville of SR-38 from Marysville corp to 5th St~|~05 - 4R Maintenance - Resurfacing~|~ECA0C9BEAB32469A06A6A9F9E1A89A605EB409DB 91391~|~1~|~2~|~02/S<2~|~100% City of Marysville items. Pavement repair, curb ramps, specialized crosswalks, etc.~|~05 - 4R Maintenance - Resurfacing~|~413FC0A04501B775E872157076F11B0037039BFE 116232~|~1~|~1~|~01/NHS~|~FY28 Smoothseal~|~05 - 4R Maintenance - Resurfacing~|~D52FEB9B11C82C8F6DA88C0DF44EE4710190BA8D 120763~|~1~|~1~|~01/SAF~|~Intersection Improvement~|~21 - Safety~|~2BC6398A0C1865C007177CAA20C986A2E8E0D14A 106505~|~1~|~1~|~01/NFA~|~The Byers Road Connector Project includes the construction of a new 2500 two lane roadway.~|~01 - New Construction~|~52B4557152EC4005B84CD72F4650BB1190BE926C 100857~|~1~|~1~|~01/NHS~|~Overlay with asphalt concrete SR 4 in Montgomery County~|~05 - 4R Maintenance - Resurfacing~|~99552188A1E57E8F1988008F907B3E4168F0F90D 119113~|~1~|~3~|~03/SAF~|~Installation of traffic calming elements and high visibility crosswalks at WAS SR 7 51.13-51.55, 51.88-52.02 and WAS SR 260 0.00-0.05.~|~21 - Safety~|~05824A0B8CCB59BE0B41DED3237FABD4C9FA0010 119113~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 807 0.00-0.24 and WAS 7 37.23-38.93, 49.43-52.19. Funded 80% Federal/20% State. ~|~05 - 4R Maintenance - Resurfacing~|~03255351C606BF59289107EE56BA50CC8925FDFB 119113~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 260 0.00-0.48. Not on the federal aid system funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~7F22F8ADF42DE746BB539E66723B4E80B6C3A9DF 86588~|~1~|~1~|~01/STR~|~4000811 JAC SR93 0.15 Intersect: Branch Black Fork CreekBrdg replacement01/STR/BR/State~|~10 - Bridge Replacement~|~409AA07B0DDCDFB8B0CC94F962BE3FED736DEED8 113873~|~1~|~2~|~02/NFA~|~Split for non-eligible safety work.~|~17 - Construction Engineering~|~5506CCD71333CDFC77F38D3B41E097933BF2FEAF 113873~|~1~|~1~|~01/SAF~|~Split for safety eligible work.~|~21 - Safety~|~09DD402985FEE3C6390B7B63DDE6E5832FB30E0D 94360~|~1~|~1~|~01/BRO~|~Block PID Funding~|~44 - Other~|~DA43B7365E78E080B65A16FA994DE14E6C2B1D12 119385~|~1~|~1~|~01/S>2~|~Construct Hiker/Bike Path~|~28 - Facilities for Pedestrians & Bicycles~|~B35B86CE8CFBC59E7CFB6AFCA522C75757ADF427 121304~|~1~|~1~|~01/STR~|~All work is within this split~|~10 - Bridge Replacement~|~4A96D60140F09A151E67442DFC12D9A61CFB3152 127147~|~1~|~1~|~01/S>2~|~Created plan split ~|~28 - Facilities for Pedestrians & Bicycles~|~E47FD4678A0CEA7CE91FAB1CEBF842BF5F636990 87212~|~1~|~1~|~01/STR~|~Resurfacing using rural STP funds. Funding from the District Preservation program budget. 80% 4PF7 and 20% 4PS7.~|~05 - 4R Maintenance - Resurfacing~|~8C1B2E2B744C922D2BA93D85230397268796D9B7 125016~|~1~|~1~|~01/NFA~|~ODNR project to resurface Lake Loramie Park~|~05 - 4R Maintenance - Resurfacing~|~0265B66ECD7E0DA747CD671B018C4E87EA0EB2E9 89323~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - JEF CR74 1.91; Replace bridge over Cross Creek and Dry Fork 0.15 mi S of CR 28. Minor roadway work will be required. We expect an individual Corps permit will be needed for channel relocation.~|~10 - Bridge Replacement~|~9ABD11D4766BF995844C6BFD6E15479E2AEE02CD 102798~|~1~|~1~|~01/NHS~|~Micro surfacing NHS routes~|~05 - 4R Maintenance - Resurfacing~|~4B4EF0CBA973B581821890E1E35D1256AE35497F 102798~|~1~|~2~|~02/STR~|~Micro surfacing STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~DB68F3716B1DD9E2128AE481B33A4C3A3C15924D 102798~|~1~|~3~|~03/S<2~|~Micro surfacing STP < 200k routes~|~05 - 4R Maintenance - Resurfacing~|~1D21BF4CC0AD7FAFD228C6D8859E7079F52F14BF 102798~|~1~|~4~|~04/IMS~|~Microsurfacing on interstate system~|~05 - 4R Maintenance - Resurfacing~|~275C935E04054D766D5DBCA827A60A3A0091FB1F 97965~|~1~|~1~|~01/NFA/MCEO~|~"01/NFA/OT/MCEO" - CEAO HSIP Funding 4HB7 (100% Federal) - CAPPed @ $288,500.00 Contract/$11,500.00 (4%) Construction Engineering - Guardrail upgrades along various County Routes in Muskingum County~|~21 - Safety~|~7EC6B87CF700CBEA246FBD31AF6FCD0B943395E9 86217~|~1~|~1~|~01/STR~|~Bridge replacement on SFN 8001626, UNI-36-0.89, over Treacle Creek.Not currently eliglble for BR funding - use STP Rural funds. 100% State.~|~10 - Bridge Replacement~|~569E8F817A26A7062B1453B95D382A9083B4EF59 88280~|~1~|~1~|~01/ENH~|~LAW SRTS Phase 2 - Safe Routes to School Project.Project Termini: City of Ironton Phase 2 SRTS Project Project Description: It is proposed to used SRTS funds to construct sidewalks Thomas Street from Delaware to McPherson (1,140 feet) and on McPherson from 2nd St. to Waldo/Karin Street (1,530 feet). 100% Fed01/ENH/OT/Ironton~|~28 - Facilities for Pedestrians & Bicycles~|~5DFA2E2CB59686ADB2DA593161A8AA4853DA6F84 100937~|~1~|~1~|~01/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~8B15F2AF72E8840AF22F5E3522087639A31753C7 101973~|~1~|~1~|~01/BRF~|~Replace bridge over Camp Creek.~|~10 - Bridge Replacement~|~065366FE90F1E439A9AB3019703F53D663BC0006 117871~|~1~|~1~|~01/S50~|~Culvert repair/replacement~|~04 - Reconstruction - No Added Capacity~|~28F37571453D9BC84DBDA2411F0CDF47C81CAA19 112387~|~1~|~1~|~01/STR~|~Replace existing corrugated metal pipe arch bridge carrying SR 149 over Campbells Run with a new structure.~|~04 - Reconstruction - No Added Capacity~|~E2DA08438E556393E0D1C7C0030F1D325F7346A6 110609~|~1~|~1~|~01/NHS~|~Plan split for paving work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~A71DC7649B94C233685D49A3D18B352AF065E345 110609~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work using 100% local funds.~|~05 - 4R Maintenance - Resurfacing~|~B688C832CC0E1CD4B2115CDA01D7FA0CF2EA527E 112638~|~1~|~1~|~01/MPO~|~Resurfacing of Goldie Rd from SR 193 to 5th Ave in Liberty Township.~|~05 - 4R Maintenance - Resurfacing~|~0BA2380610E91793E20C6BF8A3F15827B5B24ADA 104613~|~1~|~1~|~01/BRF~|~Replacement of linked structure.~|~10 - Bridge Replacement~|~8B6E479899DCAB1D092D3872FAE72A93EF9C49B6 95289~|~1~|~1~|~01/BRO~|~BLOCK Bridge PID for FY 2025~|~10 - Bridge Replacement~|~F5EF049E059CB1359E13E519E0A0A1C3F5C791C8 96003~|~1~|~1~|~01/IMS~|~SFN 8702160~|~13 - Bridge Rehabilitation~|~6538E53ECA6F29F2E4431B63AA4D50BE0FD925D1 89341~|~1~|~1~|~01/ENH~|~Construction of approximately of 1000' of new bike path. Begin work 3rd Street at existing bikeway to SR7/Greene St near Don Drum Field. Federal/Local Enhancement funds.~|~28 - Facilities for Pedestrians & Bicycles~|~C404C17A280A29C6AB797F47093FADB7D7FAA116 120058~|~1~|~1~|~01/NFP~|~Resurfacing park access roads and parking lots in the SUM Portage Lakes State Park.~|~05 - 4R Maintenance - Resurfacing~|~A15ACC2B37A0F4B131ADF311E528E9802908BAE2 123729~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance~|~21 - Safety~|~CA573258B2E91AA9F682BAE678E464CE8AFE84F4 102959~|~1~|~1~|~01/S>2~|~Plan Split 1 STP>200000~|~05 - 4R Maintenance - Resurfacing~|~FDE6247298647C06999AD0B27CBFC3FC67A0B5D1 102959~|~2~|~2~|~02/STR~|~Plan split 2 STP Rural~|~05 - 4R Maintenance - Resurfacing~|~D2778676296B3E45D05BA8DF688D358BB6AE7C0F 102959~|~1~|~3~|~03/STR~|~Bridge work to be determinded~|~~|~8227BAFD05307DC4593F874DADAD2D283F5DFDB6 102959~|~1~|~4~|~04/STR~|~bridge work to be determined later~|~13 - Bridge Rehabilitation~|~31C3830A3F1AB0EE21238E5BBE5E7406248ECA95 97946~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete (2.00 in) SR 726 SLM 0.00 to SLM 4.33~|~~|~5F91BABB2B1BAE395D5C45B7A170CA8FE4C2755C 110717~|~1~|~1~|~01/STR~|~All work in this plan split using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~43892E95D893ABDD3804DB9ED3350BAE736B6E2A 88496~|~1~|~1~|~01/STR~|~Resurface two sections of SR-300, from SLM 0.00 to SLM 2.36, then from SLM 3.51 to SLM 6.33 in Sandusky County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1D88EFC6F40C1816A9D2D4A5CAF1197822A9B170 105759~|~1~|~1~|~01/BRF~|~Plan Split 1 for Federally eligible items~|~13 - Bridge Rehabilitation~|~6CDA66B1F55B73101D0E1ADEE382ED66EF96162F 93810~|~1~|~1~|~01/NFP~|~100% State Funds (4MP7) for district wide auxiliary pavement marking.~|~21 - Safety~|~CEB23E2DF40C9C927D6414F92FA94EBDB099DAB1 80133~|~1~|~1~|~01/BRO~|~Replace existing bridge (JEF-150-1017, SFN 4102282) with a new two-span structure using prestressed concrete I-beams with composite concrete deck.~|~13 - Bridge Rehabilitation~|~174C50B299F3B266314FEE8C0262585BC958446E 80133~|~1~|~2~|~02/BRO~|~Added funding event for on-going services to be provided by COnsultant during the construction phase of the replacement of the bridge JEF-150-1017.~|~17 - Construction Engineering~|~31984CA56B732491243D0F0B89D77597DBDF95DA 122507~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes~|~21 - Safety~|~8EB4439FDAAD7B045EC8A5BC293528ECBF27E564 105201~|~1~|~1~|~01/STR~|~Crack Sealing on the rural sections of BUT-129 and BUT-732 ~|~05 - 4R Maintenance - Resurfacing~|~B0248209AEA866B18DBE0EA8FC3984A54D7BA17F 105201~|~1~|~3~|~03/S>2~|~Plan split for the large urban sections on BUT-129~|~05 - 4R Maintenance - Resurfacing~|~F07046434280FDBB78406A8F316CBE1FBD70B276 105201~|~1~|~2~|~02/S5K~|~Plan split for the small urban locations on BUT-732~|~05 - 4R Maintenance - Resurfacing~|~8C6DD7B69D9B823C5BAE9189071B1B96B0BA31E3 125828~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~FED4B9FAACE06464EFCA590FD02030963059730D 116390~|~1~|~1~|~01/NHS~|~JEF-22~|~05 - 4R Maintenance - Resurfacing~|~F6C6F0D535EEA81A2364CD92385C6D2C2928DA49 114810~|~1~|~1~|~01/IMS~|~FRA-70 from SLM 11.21 to 13.13.~|~05 - 4R Maintenance - Resurfacing~|~AA766DCA6F2E2CBBF1363087068851A16B905910 114810~|~1~|~2~|~02/S<2~|~PIC-752 from SLM 1.64-1.92.~|~05 - 4R Maintenance - Resurfacing~|~F42B5E8A4783E5E1AF376B93E962D55EE9A6E3F4 114810~|~1~|~3~|~03/STR~|~MAR-309 form SLM 22.77 to 29.21 and PIC 56 from SLM 0.00 to 16.32.~|~05 - 4R Maintenance - Resurfacing~|~C67B9901B28144BA41F5F0F6DF753B0D63C38FF4 121233~|~1~|~1~|~01/STR~|~Structure replacement.~|~04 - Reconstruction - No Added Capacity~|~80253936DC15BAA9DF529CD1EDF71882809C15D0 101401~|~1~|~1~|~01/STR~|~STP Rural Overlay without Repairs~|~05 - 4R Maintenance - Resurfacing~|~66F51E4BC6D679A9B9654202363AC5D12929A1A7 101401~|~2~|~2~|~02/STR~|~Bridge Work~|~13 - Bridge Rehabilitation~|~8055F278A1EB6D0EB2ABB7C56843513354B668D0 118507~|~1~|~1~|~01/MPO~|~Federal items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E9CE8FB55BD568A697C022656B78F2C1E30BF8FD 118507~|~1~|~2~|~02/SAF~|~Safety Items~|~21 - Safety~|~4D9825D5537DBA58C97501DA73D3883754B0B1F6 111088~|~1~|~1~|~01/SAE/NEWA~|~Safety Program Funded - 4HJ7 (100% Federal) - See CAP Comments - Construction of roundabout at the intersection of SR 13 (4th Street) and CR 132 (Main Street).~|~21 - Safety~|~0D074547D38111AB9269597A5697A5376C60DA52 90662~|~1~|~1~|~01/MPO~|~Multi-Use trails~|~05 - 4R Maintenance - Resurfacing~|~9B911DC8AF36BBC56E873699F5C2D89E3E1EF948 123871~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7B1E378A226B31CD763EA4DC2E4A69C146BBFE45 114512~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~31568D66398E02D26548113ABFD38D3A26A71E44 96899~|~1~|~1~|~01/STR~|~It is proposed to rebulid and stabilize our existing slope to stop vertical and horizontal slide movement on SR 125 0.34 miles east of County Line.~|~44 - Other~|~AFDFBC7AB7CF2C4A7A0FDA532DB0841F661BD88D 97908~|~1~|~1~|~01/ENH~|~Jefferson St. from Third to Fourth St. - Third St. from Jefferson St. to St. Clair St. - St. Clair St. from Third to Fourth St. - Fourth St. from Jefferson. - This project will improve the sidewalks and crosswalks, and include the installation of pedestrian amenities (such as benches, banners, decorative lightin, etc.)~|~28 - Facilities for Pedestrians & Bicycles~|~A493D8FDB373249FFDA3AF92262CE742409D409A 110631~|~1~|~1~|~01/SAF~|~Construction of sidewalks in East Palestine with 100% 4SC7 federal funds.~|~21 - Safety~|~89CA0D24C3F97AE2A4DE56578F658E128E725D5C 119107~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~9634B2A14F52361B24238B32F7684F0B0CD46D77 119107~|~1~|~2~|~02/S>2~|~Resurfacing.~|~~|~859EA1911F5EFA70DDE972571408751B07735E3C 119107~|~1~|~3~|~03/STR~|~Resurfacing.~|~~|~21DCF430E3012A5DD2F50193C7DA781202E96FA2 99946~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~1BF95C4FD3F5265D5465D54AE81D894FDE8B30C5 112774~|~1~|~1~|~01/S<2~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~C2C742ADA5FFA6F646AA58EC1C5FEAB0D78D343F 118849~|~1~|~1~|~01/STR~|~added plan split for stp rural resurfacing and bridge work.~|~05 - 4R Maintenance - Resurfacing~|~154A9F5D5A8D29D88DB01CAB92858F37032E1CBF 94979~|~1~|~1~|~01/S<2~|~Marion large city/local funding for resurfacing of various city streets~|~05 - 4R Maintenance - Resurfacing~|~6E9678B9293D58B64EF99AF50B7C17F3E264DB51 114804~|~1~|~1~|~01/IMS~|~Interstate plan split.~|~05 - 4R Maintenance - Resurfacing~|~FAC6235EE55A1C3050900603DEE262AFFC9573C3 114804~|~1~|~2~|~02/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~716F2DFB4CF9CB6E2636B430602B9795C7BFB162 114804~|~1~|~3~|~03/S>2~|~Columbus urban area plans split.~|~05 - 4R Maintenance - Resurfacing~|~9922EBED71F9F6C3CC81FD76FF0907C934813AF6 87528~|~1~|~2~|~02/ENH~|~Items related to a new side walk including a series of catch basins, curb and gutter along US 50, within the Village of Marathon, Clermont County.~|~01 - New Construction~|~1AA54F128428CCDEF690C3550C0F330745E674E6 87528~|~1~|~1~|~01/STR~|~Construct new pavement along US 50 within the Village of Marathon due to profile change and resurface SR 286 in Clermont County. Locations are US 50: 18.08 to 18.43 and SR 286: 0.00 to 0.30 ~|~05 - 4R Maintenance - Resurfacing~|~25D1259F9D7B696961CBCFC07A54DBBF6C3B673A 87528~|~1~|~3~|~03/STR~|~Plan Split for all work on SR 286 since it is not eligilble for Federal funds.~|~05 - 4R Maintenance - Resurfacing~|~256F846C829C08094FFF4266DDBD6609D8CE5E31 95930~|~1~|~3~|~03/NHS~|~80/20 fed/state split for work on SR-44~|~99 - State Preventative Maintenance~|~03A9FE0A0AE813747F56A5A530E6A36607B1D216 95930~|~1~|~1~|~01/SAF~|~Microsurface IR-77 Exit/Entrance ramps using safety funding with 90% federal and 10% state participation.~|~~|~652BFE52483120019BE3DE44760BECF71EAC1FB5 95930~|~1~|~2~|~02/IMS~|~90/10 fed/state funding split for work on the interstates other than safety.~|~99 - State Preventative Maintenance~|~67B82337C2494BA4123FAD15DD00F1B332270AF1 94347~|~1~|~1~|~01/NFP~|~01/NFP/BR/ ; All work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7.~|~13 - Bridge Rehabilitation~|~C1B4F717B340DA0EB8371CBDB55FB771530786DB 117063~|~1~|~2~|~02/MPO/SUCE~|~Resurfacing, Summit County Engineer.~|~05 - 4R Maintenance - Resurfacing~|~3C8CDA19A8BFE1287F24BD470F2D27945B1DE8C7 117063~|~1~|~1~|~01/MPO/FAIR~|~Resurfacing, in the City of Fairlawn.~|~05 - 4R Maintenance - Resurfacing~|~5BD6A3A1B998A24E478CE77A131F608E3D4E277C 121086~|~1~|~1~|~01/NFP~|~added RPM FY29~|~21 - Safety~|~2D1FF010E52FDDA4790EB8A1517BD3D28A569CAA 90918~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~13 - Bridge Rehabilitation~|~BA5A409A8749287705FFCCA2981E13AAD84759A0 90918~|~1~|~2~|~02/NHS~|~Village of Greenwich Water line Relocation.~|~43 - Utilities~|~B9011DCABB00D5B479718FE58DDC907553CDB507 90918~|~1~|~3~|~03/NHS~|~Columbia Gas work~|~43 - Utilities~|~C00F0003B22C53D70F3D11DDF864DFC712430C5F 115103~|~1~|~1~|~01/STR~|~Rock slope repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~254901BA1F52E23496297E0C570E4F4624DA89BE 105066~|~1~|~1~|~01/STR~|~Single microsurfacing on ATB US 6 from 2.63 to 5.75, 20.61 to 22.56, 25.18 to 29.95; ATB US 322 from 0.00 to 17.49.~|~~|~28B17FE6B3D31EA3566C42CEA1C839464F4E605D 99021~|~1~|~1~|~01/SAF~|~District wide polyester pavement marking~|~21 - Safety~|~73AF0B05E020DCE092B6D0EAB5394AE259791F44 126789~|~1~|~1~|~01/NHS~|~linked conduits~|~04 - Reconstruction - No Added Capacity~|~D7E86412949915CFA9DBFE33CCF7ABA3FEBB6A3A 98024~|~1~|~3~|~03/NHS~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. NHS route funded 80 federal/20 state.~|~21 - Safety~|~9D5BEE19E86BFAD59B7442ABBD7C73600AA5896B 98024~|~1~|~2~|~02/STR~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Rural other federal aid route funded 80 federal/20 state.~|~21 - Safety~|~00C7325206FB5F8E498DC1AF490ECD5F365E46ED 98024~|~1~|~4~|~04/S<2~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Urban other federal aid route funded 80 federal/20 state.~|~21 - Safety~|~7706091DF3CC89C3FC8C0A638A3B86F534804477 98024~|~1~|~5~|~05/NFA~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Not on the federal aid system funded 100% state.~|~21 - Safety~|~5CAAD569E62197D3E837DB7488D792E023198D69 98024~|~1~|~1~|~01/IMS~|~Flat Sheet sign replacement project in FY2021 in Meigs and Noble counties. Interstate route. Funded 80 federal/20 state.~|~17 - Construction Engineering~|~CB6E1ECF4C0B16DBCC56BB4779A58515D7068010 114748~|~1~|~1~|~01/STR~|~Culvert plan split~|~04 - Reconstruction - No Added Capacity~|~BFAC25AEC85D3573F6C19AD834235C72083537A1 103373~|~1~|~1~|~01/SAF~|~Plan Split 1~|~21 - Safety~|~1649EDC7B767FE6E38B329662ED00ABFBBB75751 117551~|~1~|~1~|~01/NFA/BOAR~|~New sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~AA07B93E815C3F6E87C63E229544823F0CDDA2A5 95992~|~1~|~1~|~01/NFA~|~Resurfacing and related work on SR 313.~|~05 - 4R Maintenance - Resurfacing~|~444D5543945C593D34A7A0C4A987720B094D9157 100032~|~1~|~1~|~01/ENH~|~Construction of sidewalk on the south side of Bridgetown Road (SR-264) from the Township's Public Library to Markay Court.~|~28 - Facilities for Pedestrians & Bicycles~|~22798CA554C145B8F87493E530CE22D4D6A12033 108683~|~1~|~1~|~01/SAF~|~Safety Plan Split~|~21 - Safety~|~B937798151BD55CDCA2627A87411B9D63AB21100 97242~|~1~|~1~|~01/NHS~|~Remove deteriorated non-composite box beams and replace with composite box beam superstructure. (BR. No. MOT-235-0177R, SFN 5709792)~|~13 - Bridge Rehabilitation~|~E2FC176A210564E257D2DBA40A15F66DF88B1CF4 110874~|~1~|~1~|~01/S<2~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~50C37B49060595528CA57E9F1E976DE35B06C49D 99928~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project with an asphalt overlay treatment. WAS CR 341 0.00-1.01. Rural other federal aid funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~DEB52CF41830D6BFEF9665A7F5C01618C12CC412 90399~|~1~|~1~|~01/IMS~|~Sign (all overhead guide, ground mounted guide, regulatory, and warning signs) replacement project on IR 77 in Tuscarawas county from SLM 20.54 to 34.97.~|~21 - Safety~|~36865F64A12CC440332A63DF3243452E86CDFF36 90399~|~1~|~2~|~02/S<2~|~Sign (all overhead guide, ground mounted guide, regulatory, and warning signs) on COL 62 from SLM 13.01 to 14.12 and on COL 14T from SLM 0.00 to 1.53.~|~21 - Safety~|~BF1251A502913EBF53E3C47EEA93FC813B3E40E5 119219~|~1~|~1~|~01/IMS~|~Interstate plan split~|~05 - 4R Maintenance - Resurfacing~|~0BADD97DA8183A293050FE2D227F8931A6330B1B 119219~|~1~|~2~|~02/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~76AC0498FBBF480173DFB5D0F8E80CC83E297A83 108459~|~1~|~2~|~02/STR~|~Split for work on the rural STP system~|~04 - Reconstruction - No Added Capacity~|~E094AE50FC1ECE350ADFDE982F43ED4CCB0F8852 108459~|~1~|~3~|~03/NHS~|~Plan split for work on the NHS~|~04 - Reconstruction - No Added Capacity~|~D5E1C09ED4FD860E309F34FAE9431CC258E1A2F0 108459~|~1~|~1~|~01/S>2~|~Split for work on the Cleveland urban STP system.~|~04 - Reconstruction - No Added Capacity~|~5AAC7867F13A0C41F702B35548AA642F4FD4956C 108459~|~1~|~4~|~04/S<2~|~Split for work on the Chardon urban STP system.~|~04 - Reconstruction - No Added Capacity~|~BD6D81E0450043009501B2506A69A4CC5804FD18 108459~|~1~|~5~|~05/NFA~|~Setup part code from utility reimbursement from First Energy~|~04 - Reconstruction - No Added Capacity~|~C0E62E0D8B9C8807B8F0B457016AEF68981596D4 102625~|~1~|~1~|~01/MPO~|~Add sidewalks~|~28 - Facilities for Pedestrians & Bicycles~|~06EA3A212EE02998798B63E0A7F4757C6C45416E 94135~|~1~|~1~|~01/STR~|~Resurfacing MAH SR 617 from 0.00 to 3.68 and 3.77 to 4.74, includes minor work to SFN 5006074.~|~05 - 4R Maintenance - Resurfacing~|~061F6E7CE61EA14BD7D8966326C6418FD842D45F 102498~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Replacement of RPM District Wide in FY 2022.~|~21 - Safety~|~0D36C679313273A7E5059E8FDA32A21A3AAB5A38 122129~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~7808B4D398DF5B291C74AD3082752C05D6817FD7 120684~|~1~|~1~|~01/NHS~|~Tree Cutting on ATH 33 18.70-25.39 and MEG 33 0.00-4.09. Funded 100% State.~|~20 - Environmental Only~|~8212340522A84E2C2B3E956CF6FF5AA2ECFC0E08 88233~|~1~|~1~|~01/NFA~|~Rural route not on federal aid system. GSMP funds up to $1,000,000 then district funds after that. Landslide into creek, realigning roadway to mitigate landslide.~|~04 - Reconstruction - No Added Capacity~|~75E7FD17DDBEDB8EC19224EA6287EE729413EEA5 112980~|~1~|~1~|~01/IMS~|~Paint and patch substructure of 1401416 & 1401505. Paint, patch barrier and substructure, and replace VPF of 1402102.~|~13 - Bridge Rehabilitation~|~4F1D32B5171E8F7A442C1FDE08448C8321F3A62C 112980~|~1~|~2~|~02/S>2~|~Plan Split for the Large Urban Locations.~|~13 - Bridge Rehabilitation~|~62C6C3D5F3D37ADA97FB79E10C9BAD5D45FE9B9C 112980~|~1~|~3~|~03/S5K~|~Plan Split for the Small Urban locations. ~|~13 - Bridge Rehabilitation~|~23219D1672F553863BA4F55EB1C9FFB397094A07 112980~|~1~|~4~|~04/NFA~|~Plan Split for the Non Federal Aid route location.~|~13 - Bridge Rehabilitation~|~A4DB0953D6468AD60890A2A62B8DCB043B7089EC 119272~|~1~|~1~|~01/NHS~|~Roadway work to raise settled pavement to fix vehicle bounce leading into curve.~|~21 - Safety~|~262D32DAD611C3131328B8E10A902B4620E1523F 97134~|~1~|~1~|~01/NHS~|~upgrade queue detection with new signs and software~|~21 - Safety~|~43976A1AD4FF573B27A56038797F5EB91F47ED3B 107345~|~1~|~1~|~01/NFA~|~D09 Deck Sealing Project FY2024~|~47 - Bridge Preventive Maintenance~|~C04E16129EF054EA58B97D5FFB98113E196F94F0 111489~|~1~|~1~|~01/NFA~|~Plan split for bridge replacement work~|~10 - Bridge Replacement~|~B077A9441DF24EA9143711936428B8A74499712B 91566~|~1~|~1~|~01/NHS~|~Replace existing deck on bridge (JEF-7-0771, SFN 4100301) with a new reinforced concrete deck made composite with existing or new beams. If existing beams are retained they will be painted. Provide new approach slabs. Repair/Rehabilitate substructure units and convert abutments to semi-integral.~|~13 - Bridge Rehabilitation~|~8DA6512BF900A37DB39B49D653A4C940405ADCD1 122964~|~1~|~1~|~01/IMS~|~Plan split for bridge work.~|~13 - Bridge Rehabilitation~|~405F1FBF8D456D166C0D6322BD6A883CE4F21DED 113490~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~F7416913D6C8653B8E1E49AB693F01C88EE17498 108024~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~655732307D18D05B1846D19B6FE62C960739162C 93031~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - Geological Site Management 4SS7(100% State) - CAP = $230,000.00 - Embankment stabilization below KNO SR229 14.8-14.80~|~04 - Reconstruction - No Added Capacity~|~CEB599E991D56EB94619742B9D3C5BA00CD6C844 114605~|~1~|~1~|~01/MPO~|~This split includes all work associated with constructing the sidewalk proposed with this project~|~28 - Facilities for Pedestrians & Bicycles~|~6795DFD7D4AAD13DFAF04767E4A0B0D253B011FE 114605~|~1~|~2~|~02/SAF~|~Work includes all curb ramps, traffic control, traffic signal and maintenance of traffic related to pedestrian improvements at the intersection. ~|~21 - Safety~|~C69B5B9E27C781ED23A4370D07876A698B2F2205 110914~|~1~|~1~|~01/NHS~|~Collision impact repair of the BUT-129-2139 bridge that carries Van Goren Rd over SR 129.~|~47 - Bridge Preventive Maintenance~|~F434C8E81EE615DD1E8A0FA38A1E40EC4F49DBB4 115607~|~1~|~1~|~01/IMS~|~Mowing Contract~|~44 - Other~|~2BD5FAFAD41CAC6E36143C91C2D3F0A778E1E741 93194~|~1~|~1~|~01/STR~|~General system paving of MAR-309: 29.30-30.09, MRW-309: 2.48-4.92, and MRW-61: 22.86-25.27~|~05 - 4R Maintenance - Resurfacing~|~469326C643AC6A32CD48BB47A68A37A89F8BFEF8 119282~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~009F770AC776C6C1B72DE50638247628C070F081 105154~|~1~|~1~|~01/BRO~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~10 - Bridge Replacement~|~FE16D4A922C6A8ECCA16AD20AAC7F8405EE7235A 117379~|~1~|~1~|~01/MPO/LOWE~|~Resurfacing of River Rd, E McGaffney Ave and E Jackson Rd in the Village of Lowellville.~|~05 - 4R Maintenance - Resurfacing~|~D1325BB61B6E6B8C15E7854A32ED4DE3860EA33F 99085~|~1~|~1~|~01/NHS~|~Slope failure~|~44 - Other~|~DA1A04B11E19092EF6DC2105C3D926E29429BBC6 96542~|~1~|~2~|~02/IMS~|~Structural Steel repair on SFN 1204025 CLA-70-0657, SFN 5707021 MOT-75-0958 and SFN 5706998 MOT-75-0932.~|~13 - Bridge Rehabilitation~|~013E8C982FB554CF119004F4126DC8AFCE955A23 96542~|~1~|~4~|~04/S>2~|~Structural Steel repaid on SFN 1205528 CLA-72-0915.~|~13 - Bridge Rehabilitation~|~3C8C7617F9081D0FEE7294B8DDA7003CFE2C2441 96542~|~1~|~7~|~07/NHS~|~SFN 4601564 LOG US 68-0979 - repair rt. rear fascia abutment bearing concrete area. Reset loose bearings 1 forward abutment and 1 rear abutment. Replace perforated end frame forward abutment.~|~13 - Bridge Rehabilitation~|~76B791394A7D767AB0475D43CFC480ADB00F5967 96542~|~1~|~5~|~05/NHS~|~Structural Steel Repair on SFN 1902431 DAR-36-1300R~|~13 - Bridge Rehabilitation~|~9283502F2B4BA2CA30F619835CB62F31EEA768F1 96542~|~1~|~3~|~03/NHS~|~Structural Steel Repair on SFN 1202707, CLA-68-0741.~|~13 - Bridge Rehabilitation~|~9D3E08BEFAA8F335C119DECBBEA47B82E6972BD2 96542~|~1~|~1~|~01/NHS~|~Structural steel repair on SFN 0600253 AUG-33-0591L and SFN 1200038 CLA-4-0667L. SFN 4600916 LOG-33-0280 R (NP 000) - reset all bearings, look at a pin retrofit for one masonary plate.~|~13 - Bridge Rehabilitation~|~AF78391C49C998010FDC00E75484030439E09F51 96542~|~1~|~6~|~06/NHS~|~SFN 4603737 - LOG SR 540 0165 (NF 706) - 4 bearings on forward abutment out of sdjustment (2 beyond recall) and need reset. 2 bearings on rear abutment and need reset.~|~13 - Bridge Rehabilitation~|~C9E3553C10E7918FD2E452AC145187CDD3E842A7 87240~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using a mill and fill treatment. ATH US 33 5.92-10.40. NHS route paid 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~D6C469EE02D7E7779C12EE2CECAC515FEAB97EEE 111281~|~1~|~1~|~01/NFP~|~Excavate, prepare and asphalt new parking lot at the Holzapfel Preserve.~|~01 - New Construction~|~2549BA72D10EB31C463E7455120A1B56D99DC7FD 117932~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~~|~470B20109F0B061347303E81A19D71E13B41CBDC 90755~|~1~|~1~|~01/BRF~|~Project includes replacement of Bridge BUT-TR 58-0039 SFN 0931306 over Four Mile Creek, and improving horizontal and vertical alignments associated with the bridge. Existing pavement in the project area will be widened to provide a safer roadway system. Pedestrian access will be provided across the bridge to Yager Stadium and other facilities from the parking areas on the east side of the bridge.~|~10 - Bridge Replacement~|~0325BCB313B1497CE6D3FE3F42D00D78FF139C62 89399~|~1~|~1~|~01/STR~|~BRO SR 505 0.18 Slide Repair 80/20 split.~|~21 - Safety~|~E112AC1370E8CFB3C8CF7849682C954C8D1420A0 89267~|~1~|~1~|~01/S>2~|~Split for Urban System paving work on the STP~|~05 - 4R Maintenance - Resurfacing~|~B33F13E25390E41940A91691E377BE3B7DAAFC34 89267~|~1~|~3~|~03/NHS~|~Split for paving work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~D72032916E3BACC2CE0FECA928AC5D4D3875D2F4 89267~|~1~|~5~|~05/S>2~|~Split for General System paving work in Brooklyn Heights~|~05 - 4R Maintenance - Resurfacing~|~FC24173B27D5715CB67175384C4188229C4B894C 89267~|~1~|~2~|~02/NFP~|~Split for 100% local items of work on the STP Urban System~|~05 - 4R Maintenance - Resurfacing~|~8C6134DB5F4708429E63771B2BD1C9E262DF8397 89267~|~1~|~4~|~04/NFP~|~Split for 100% local items of work on the NHS Urban System. ~|~05 - 4R Maintenance - Resurfacing~|~D69DDD05EF38518CEF9005685D3C749F284477D5 89267~|~1~|~6~|~06/NFP~|~Split for 100% local items on the General System~|~05 - 4R Maintenance - Resurfacing~|~31A2D59419BA42C820CF70162E1E6BD04A3E6250 94420~|~1~|~1~|~01/STR~|~Two Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5016E62C7F8434F4C0F9BBF062F48A933A78D6CE 94420~|~1~|~2~|~02/STR~|~LOR-57-4.45 SFN: 4702395Preventative Maintenance- Bridge railing upgrade/repair ? Provide guardrail retrofit upgradeReactive Maintenance- Deck overlay (asphalt) - Plane and pave full width~|~13 - Bridge Rehabilitation~|~BCCD5B926CD89F80AB94487157C89BFDD519F3E2 85361~|~1~|~2~|~02/S>2~|~100% Local participation for non-eligible work items, CE&I and cost over the state funding cap.~|~05 - 4R Maintenance - Resurfacing~|~516B2A5B014886CEF1963B59CD677B0B7F65F55C 85361~|~1~|~1~|~01/S>2~|~80/20 state/local funding split for the resurfacing portion of the project using state urban paving funds.~|~05 - 4R Maintenance - Resurfacing~|~CBC74B26530D740F867E7E78313EEA99B1A5B90B 97348~|~1~|~1~|~01/NHS~|~Added~|~43 - Utilities~|~80709895799A2AB5269A395980B1C2A9A6F21D38 108050~|~1~|~1~|~01/CMQ~|~Construction of bike/ped path in Barnesville.~|~28 - Facilities for Pedestrians & Bicycles~|~F778BB2B4F41D207F181349492C629717626544F 87595~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation Funding - No CAP - Gue-IR 70-22.80 to the 28.50. Includes the overlay of SFN 3002160 and SFN 3002195 and resurfacing of the ramps at SR 513.~|~05 - 4R Maintenance - Resurfacing~|~A2626F05A9DFD5FEF8AF22176A478BE02B1ED358 98179~|~1~|~1~|~01/STR~|~STP Rural Non-BR Bridge Replacement PIC-62-4.51~|~10 - Bridge Replacement~|~12D3557E09A01543D15CB431242866484B5FB2D4 116063~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV/ - 90% 4PF7/10% 4PS7~|~05 - 4R Maintenance - Resurfacing~|~D21B597506DE10AD95B7C416CC4AAB00B9A95424 107387~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2021. Locations include: WAS 50 4.42-5.88, MEG 32 0.00-3.82, VIN 32 0.00-7.67, WAS 7 4.42-20.41 and WAS 339 0.11-0.41.~|~21 - Safety~|~7CD3AF4E88D354635D1EBEBFF12543D927D8A9C7 107387~|~1~|~3~|~03/SAF~|~Install supports and signs for the Distracted Driving Corridor and ATH 33.~|~21 - Safety~|~623EC78D49DB8B9CD91E47AE7E3E72BF91924F67 107387~|~1~|~2~|~02/S<2~|~Extrusheet sign replacement in D10 for FY 2021. Urban route locations include: WAS 339 0.41-0.46 and WAS 618 0.00-1.19.~|~21 - Safety~|~110D642232BBBD6D9B87F2DFBC3299952C81BF36 124070~|~1~|~1~|~01/MPO/STPK~|~Resurfacing trail.~|~05 - 4R Maintenance - Resurfacing~|~D017752A74AC1A563C5972E5BABBE75093B64B42 101518~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 7 5.22-10.20. NHS route funded 80 federal20 state.~|~05 - 4R Maintenance - Resurfacing~|~4FC22871E90F0B49B532FDFAAA510D77D29FCBD0 101518~|~1~|~2~|~02/SAF~|~Add safety rumble stripes to GAL 7 5.22-10.20. 90% Federal Safety and 10% State Safety funds.~|~05 - 4R Maintenance - Resurfacing~|~63482862B44F31C555CEBAB465B9325F1E94E384 115010~|~1~|~1~|~01/S>2~|~Construction of a roundabout~|~04 - Reconstruction - No Added Capacity~|~B55B8E1BADE32AB1AEA4148FFA6A1F92B250A460 118878~|~1~|~1~|~01/NHS~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~F69C1C932928BFBD6BE671321EE4FA81CA591284 96180~|~1~|~1~|~01/NHS/Nerk~|~"01/NHS/PV/NERK" - Plan Split for resurfacing Lic-13-(10.19-11.89)~|~~|~31404AC22063443E63507A8A89132AD5DD72EC59 107707~|~1~|~1~|~01/IMS~|~Capacity improvements at NW Interchange.~|~~|~7AC2A92BFA560589CFB3F2F068F0DC55459DE5B3 126086~|~1~|~1~|~01/S5K~|~stp 5k~|~05 - 4R Maintenance - Resurfacing~|~866FAD12B01F7F87F3D09A3DCABD4BFFCA9BC01B 126086~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~C0F68D80428FA43F446393B853D9D110D451B61F 93181~|~1~|~1~|~01/NFP~|~Herbicidal Spraying on SUM IR 76 0.00 to 15.42 and TRU IR 80 0.00 to 12.33 and TRU SR 11 3.45 to 28.47.~|~44 - Other~|~FC28636FDFB3ED43D95FDD4693960460E4526C32 105245~|~1~|~1~|~01/STR~|~Resurfacing HOL-241 from SLM 7.75 to the Wayne Co. Line~|~05 - 4R Maintenance - Resurfacing~|~6CC85A89EE226E2183CA41E82CF8CA56839A60C3 98404~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on:CLE-125 SLM 5.13 to 6.92CLE-125 SLM 6.92 to 7.11CLE-125 SLM 7.11 to 7.37CLE-125 SLM 7.37 to 8.95~|~~|~B7D1912EDBBA20D4A0F3FF843B6D0E0B5FB382F8 94076~|~1~|~1~|~01/NFA~|~Construct a new 40' X 80' equipment storage building at the Logan County Garage Complex.~|~01 - New Construction~|~C49F5B861B959E1A161473AEA9DB0E787B6D78E2 102145~|~1~|~1~|~01/S<2~|~Bridge Replacement SCI SR 140 1.64 (SFN 7304021)~|~10 - Bridge Replacement~|~C846FC03F9F819D3C3B23D2CF09A7461F5E4E262 106686~|~1~|~1~|~01/ENH~|~Construct 10' - 12' bike/ped path in the Dover Canal Park, ADA compliant with lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~C8C79D00E34B55CD9282B23B8E3759F8F684BE78 105539~|~1~|~1~|~01/S>2~|~Routes located within the Columbus Urban Area and their associated bridges~|~05 - 4R Maintenance - Resurfacing~|~3969BE93F950C26D50130EBC6351C7CB62907A91 105539~|~1~|~2~|~02/STR~|~Routes located in the Rural Area and their associated bridges~|~05 - 4R Maintenance - Resurfacing~|~12AAFD47AD88B167891DBD5C8E0FA27A8F9762C3 105539~|~1~|~3~|~03/IMS~|~Routes on the interstate system and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~C6E8117FBD39A37596BE94F57FD56B02AABF5691 105539~|~1~|~4~|~04/NHS~|~Routes on the NHS and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~D1F7FC443E72203D8E81D935982D5A717F02F9A5 115788~|~1~|~1~|~01/S5K/USAN~|~All work in the project. 95% federal funds from the Small City program until the cap is reached. The match and all funds needed after the cap is reached will be provided by the City of Upper Sandusky. ~|~05 - 4R Maintenance - Resurfacing~|~8D095370B910E8D77E8FF2450AE00C3261A49B03 115851~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2029. Various routes and sections in D10.~|~21 - Safety~|~879E2D2CA8B43EA639459996F950C53F92272C72 99605~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AB198EF4BDDA2BFA11A2FD910C003988E13D1303 108034~|~1~|~1~|~01/S<2~|~Bridge.~|~13 - Bridge Rehabilitation~|~468898E8FD3E483987D8E04921333D154AC4BA9A 95921~|~1~|~1~|~01/NFP~|~Design and Construction ( as per Facilities Master Plan) of New Crawford County Garage~|~44 - Other~|~7F6AE0DD16B2487D9401FC552F32D3ED09ADAE10 124966~|~1~|~1~|~01/MPO~|~mill and pave Glendale Milford Road from Springfield Pike to Wayne Avenue in the Village of Woodlawn~|~05 - 4R Maintenance - Resurfacing~|~18BD3949CC8D56564F1AD7825A5BC4BC459510BE 93104~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/BR/ZANE" - City of Zanesville STP Funding 4TA7Z05 (80% Federal) / LNTP (20% Local) - No CAP - Replacement of deficient bridge on CR 146 over Joes Run - Not BR Eligible for Rehabilitation or Replacement~|~10 - Bridge Replacement~|~6B1EA7E95FF6BD7C02BD70A1C84E46729C2A0A23 107145~|~1~|~1~|~01/NFA~|~The City will extend Vision Dr. approx. 1200' north of Production Dr and improve Bonnewitz Ave starting at John Browns Rd 7500' east to SR 127~|~01 - New Construction~|~371E46343676F973D90F10EF24170E9554117D97 83378~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment and retaining wall. Remove failed wall flatten out slopes with new embankment.~|~04 - Reconstruction - No Added Capacity~|~44DE891285433ECD8B20CB22930DE9E8167FBF14 109654~|~1~|~1~|~01/S>2~|~Resurfacing on the urban section of BUT-177~|~05 - 4R Maintenance - Resurfacing~|~637E4E1254CE3F5C52C225107FEB58937C6107F6 109654~|~1~|~2~|~02/STR~|~Resurfacing the rural portion of BUT-177~|~05 - 4R Maintenance - Resurfacing~|~D928E6B8C2A7AE66B418DE01B7FD9C0609AEAF1F 126108~|~1~|~1~|~01/NHS~|~Plan split for all work associated with the OTT-2C-0001L bridge~|~13 - Bridge Rehabilitation~|~EAD6D73EC11C34D6521C2928F71F4123A0FB286F 104651~|~1~|~1~|~01/ENH~|~Construct new McGaffney Road Extension in the City of Lowellville.~|~01 - New Construction~|~070FC7873A7296B02EB8CBE8D31F1407D7EAB2AC 117801~|~1~|~1~|~01/STR~|~Two Lane Resurfacing Project using a microsurfacing treatment. WAS SR 339 13.54-20.22, NOB 78 16.04-21.29.~|~05 - 4R Maintenance - Resurfacing~|~0E5E4BA6A210B5B829FFDCBE11681FC418159911 100777~|~1~|~1~|~01/NHS~|~Bridge painting project. VIN 32 2.58 L (SFN 8202737) & R (SFN 8202761), 6.39 L (SFN 8202850) & R (SFN 8202885), 7.48 L (SFN 8202915) & R (SFN 8202974). NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~EAEB3C1374BDEA279EAAB8ECA0A70B944344B388 100777~|~1~|~2~|~02/STR~|~Bridge painting project. MEG 124 5589 (SFN 5301831). Rural other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~99BBEB24E519675E62AE3FA32324ACD2583982C1 120665~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9C447242E7F16905E5262A358C468347A25B78FA 115339~|~1~|~1~|~01/MPO/AURO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FFBE045A2F9D5C70C707E0854EA3B310450AA37C 122135~|~1~|~1~|~01/S>2/FCEO~|~CEAO safety funded replacement of the bridge carrying CR 125 (Frank Rd) over a tributary to Scioto Big Run.~|~10 - Bridge Replacement~|~F38833B84E431AC9C05A9B705319BF8538D45DD5 83299~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" - County Engineer's Association Funding 4B87(80% Federal) / LNTP(20% Local) (Credit Bridge Approval 1/13/2011 for 15% match) - CAP = $707,000.00 CEAO Federal dollars/$106,050.00 in Credit Bridge Revenue - Replacement of 2339331 FAI CR24 0.33 Intersect: T Muddy Prairie Run(Cr24; BR Eligible for Replacement: Length=36 SD/FO(1) SR=49.8 DSR=6~|~10 - Bridge Replacement~|~1DE1769171873E1A2CD276ED2DE707870381192B 85375~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-SR 37-15.73 to 16.21; 2) Lic-SR 16-14.26 to 19.79;~|~~|~3488AAED9337041886013DEED216DD501E56EEB2 85375~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-SR 37-16.43 to 16.66; 2) Lic-SR 661-00.00 to 00.02;~|~~|~6AF45C54260A30F1D07B9EB755ABC14BD1364CD8 85375~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Lic-SR 661-00.02 to 00.12~|~~|~D9D0EE8EBAB1AF2F61D3B523B5F7032FC973F52E 103073~|~1~|~1~|~01/STR~|~Plan Split 01 created for Crackseal Block FY22~|~05 - 4R Maintenance - Resurfacing~|~7F67C17B4E46CF8ED0CD5CC7A770BB4DC8DF36E6 103073~|~1~|~2~|~02/STR~|~Plan Split 01 created for Construction Engineering Crackseal Block FY22~|~17 - Construction Engineering~|~94B363C0D96A4F7E7CBAB4D554D2A97A7B631E43 96650~|~1~|~1~|~01/NHS~|~01/NHS/PV ; All work is in this split. Funding is 80% federal and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~190D1776A0981B6B07932FDB5FB7AE2B669C52AD 85078~|~1~|~1~|~01/MPO~|~Plan Split for SUM SR 91 21.11 to 21.65~|~04 - Reconstruction - No Added Capacity~|~6D31B60125C00E3F0E18FBD13BC8AFEF8B8C1464 92753~|~1~|~1~|~01/MPO~|~LAW Intermodal Crand Foundation South Point Ohio Project Description: The proposed project is the construction of a sheet pile dock along the Ohio River to support a crane at the River Port Facility at The Point Industrial Park in South Point, Ohio. The crane will allow the transfer of bulk freight products from truck to water and vice versa. It is anticipated that an independent operator will provide a crane capable of transferring products between road and river thus providing a resource to move products in the most efficient way from the TriState Region to other areas throughout the Midwest. The crane will be provided by the operator and it must meet the Corps of Engineers specifications. Currently there are no similar private or public crane facilities within 100 miles of the site. The project encompasses all phases of work at the riverfront site. The Point is located adjacent to the Ohio River and is part of the Port of Huntington. It is also located near I-64, US 52, and the Heartland Corridor. For full project description/details refer to PID# 85830. An MOU is written to attach to an LPA agreement between the Port Authority & LEDC, Lawrence County Engineer (TID) & MPO KYOVA with SIB loan. Coordination between FHWA & MARAD for US DOT oversight. 80% Fed KYOVA & 20% Local Match (Ironton) 01/MPO/OT/Ironton~|~01 - New Construction~|~5CD4FFE72FE1A9123A593F803B30FFB38CF0CEA0 111254~|~1~|~2~|~02/S<2~|~Resurfacing CR38 3.85-4.01~|~05 - 4R Maintenance - Resurfacing~|~9A72525C5AEFBF286FCFE266E717165438B80BA5 111254~|~1~|~1~|~01/STR~|~Resurfacing CR9, CR22, CR23, CR38, CR40, CR153~|~05 - 4R Maintenance - Resurfacing~|~31CCB636E9127C3DAD0FCAB1623344F820C7B536 111254~|~1~|~3~|~03/NFA~|~Resurfacing CR19, CR25, CR28, CR166~|~05 - 4R Maintenance - Resurfacing~|~A610FD53D1C608D661F9E2AD63396A344D360488 105432~|~1~|~1~|~01/IMS~|~Fundling split for interstate bridges~|~13 - Bridge Rehabilitation~|~358BE947E45CD53C3C18D89725CAE2E0533E5151 105432~|~1~|~2~|~02/NHS~|~Funding split for NHS bridge~|~13 - Bridge Rehabilitation~|~6597B35E766B2271B7343C3DA02A9ED6E45D4B2C 97932~|~1~|~1~|~01/ERD~|~Roadway rehabilitation of Lincoln Avenue, including enhanced crosswalks and signage, along with the installation of pedestrian signals, in the City of Youngstown, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~CD4F8450CF3F09AB7430C448C0D8AAE191A0D4B1 113939~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 821 4.44-11.74.~|~05 - 4R Maintenance - Resurfacing~|~41F420297CF0A14CC6FB7A278C7E805043EF80F6 113939~|~1~|~2~|~02/SAF~|~Shoulder widening on WAS 821 4.44 funded 90% Federal Safety/10% State Safety. ~|~21 - Safety~|~7FF1A6C69B6E993B996759FF28F0514414F7D51A 105736~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items~|~44 - Other~|~4A1DFC95AD5CC9550BFBB74956780DF09657377A 105736~|~1~|~2~|~02/MPO~|~Plan Split 2 for 100% local items~|~44 - Other~|~6F4F8B3BBFCD0ED1C79DE722E3AC96629FB4208F 88922~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (BEL-148-1070, SFN 0704024) with a new single span slab bridge or a four-sdied precast concrete box structure.~|~10 - Bridge Replacement~|~ED0B7EFDCDAB06B5255A2B3F60669BBD4765036E 84624~|~1~|~1~|~01/STR~|~It is proposed, on SR772, beginning at the Pike Co. line (0.00) and ending at Blaine Hwy (CR167) (6.36),to resurface the existing highway with asphalt concrete on portions of the highway.80 Fed/20 State 01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~3525EAA77C13FDAF1586ECEA8FC84F7E2A79018B 121100~|~1~|~1~|~01/IMS~|~Construction~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~46FAE6837E9914E4F33D89B8C2D2FA62AAFFB5B5 124709~|~1~|~1~|~01/S>2~|~Plan Split for roadway reconfiguration and pavement markings for a separated bike lane using safety funding.~|~28 - Facilities for Pedestrians & Bicycles~|~743CDE300CEE8DBA40D846D79AE0E9EA6E578890 126102~|~1~|~1~|~01/BRO~|~Plan split for bridge work on LUC-24-2899~|~13 - Bridge Rehabilitation~|~465D42AAF8191984AB020F24C579A3E428E326F5 101846~|~1~|~1~|~01/NFA~|~Split for instream and slope repair~|~~|~21573BF5157BAD9046EEC40021FDCA5754C21A4A 98061~|~1~|~1~|~01/IMS~|~Widening and concrete overlay of SFN#7702671, SUM-IR77-9.58L, in Coventry Township, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~7E9CD96F376DFC38F67481630B94ECA9EAE329EF 98061~|~1~|~2~|~02/IMS~|~Deck replacement of SFN# 7705794, Pedestrian bridge at Chester, in the City of Akron, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~EC086BC458143EAF2048925DE909C482C4E8FA0B 112812~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 45 from 2.84 to 10.63.~|~~|~66FE53D925882082DDB7E72A506C00A2900120AC 112812~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span.~|~~|~13F0C842048BA093B5FE8351BF9AD2367ECCF5BB 123548~|~1~|~1~|~01/NFP~|~D09 DS FY2031~|~47 - Bridge Preventive Maintenance~|~F6D140B6CB7C1EAD70A22F2D9CE57B5764565E59 121504~|~1~|~1~|~01/SAF~|~Traffic signal & lighting maintenance~|~21 - Safety~|~57988B10DE926B2EE89361EE574E56202CFF5116 103297~|~1~|~1~|~01/IMS~|~Split for interstate grass mowing~|~99 - State Preventative Maintenance~|~6D0E5E1EC4E7208C3FC3DB5463233122D3E2B087 122066~|~1~|~1~|~01/NFP~|~Plan Split for repairing guardrail in all counties in District Six, besides Franklin County.~|~21 - Safety~|~2B485A411BA3E06F3D1395BCFC34855000C6E165 98793~|~1~|~1~|~01/SAF~|~Conversion of the existing signal controlled intersection of Beckett Road and Smith Road with a single lane modern roundabout.~|~21 - Safety~|~668E60C47805C93E25F321B41E1FC5590249E1D6 92884~|~1~|~4~|~04/NHS~|~80/20 Fed/City NHS section~|~05 - 4R Maintenance - Resurfacing~|~0C5C8AE57E8C8B51DEA36BB008132402FF370545 92884~|~1~|~3~|~03/S<2~|~80/20 Fed/City STP section~|~05 - 4R Maintenance - Resurfacing~|~74DDFEDBE3FD762A1494D1C6F9640DB048E4876A 92884~|~1~|~1~|~01/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~81350F0EBA7DBCC2856D07443C8A6BC67F706429 92884~|~1~|~2~|~02/NHS/HUR~|~100% City of Huron~|~05 - 4R Maintenance - Resurfacing~|~9584F297858B8998878F11D0BD267F9EDDB8686C 92884~|~1~|~5~|~05/NHS~|~NHS Bridge Work~|~13 - Bridge Rehabilitation~|~F5B5D5B31C184861CD9224A6C308E9628B98C9D8 115196~|~1~|~1~|~01/ENH~|~Construction of a bikeway along the top of the levee.~|~28 - Facilities for Pedestrians & Bicycles~|~13E58D1EA86E81B40CD79EE2E3628504C82E9BC7 88896~|~1~|~2~|~02/S>2~|~Resurfacing SR 619 4.66 to 5.10.~|~05 - 4R Maintenance - Resurfacing~|~1AC5A37D1F4DB67137CC9110E9792CEA53A4665C 88896~|~1~|~4~|~04/NHS~|~not BR Eligible: SFN 7601808 SR44 14.36 over US62 30.18~|~13 - Bridge Rehabilitation~|~FA333725CAA2C733B064EA8BBDE51D27E5D7939B 88896~|~1~|~3~|~03/STR~|~Resurfacing SR 44 from 19.39 to 23.21.~|~05 - 4R Maintenance - Resurfacing~|~E3494311ED1961EA516A2F49F4FF59C500BD6871 88896~|~1~|~1~|~01/NHS~|~Resurfacing SR 44 13.69 to 14.67.~|~05 - 4R Maintenance - Resurfacing~|~92BFA020DDFE2F443EEFF5D2D97ACC0D8EDD9628 88896~|~1~|~5~|~05/SAF~|~Replace sign truss and mount larger warning signs on US 62 near Rowland.~|~21 - Safety~|~9F1E0FF5C6A5F39337E12796E3FB82CA7C83390F 107732~|~1~|~1~|~01/STR~|~Land slide repair project. MOE 536 7.01-7.11. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2BE3A75DA440C18000ED64DDC33E4B3DE4FF664 107732~|~1~|~2~|~02/STR~|~MOT items and work related to Stat Oil moving an oversize load through the work site during construction phase. 100% Private Pay.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7CE58C575ABB86E35DCCB6A14BDA602ED30C13B1 102487~|~1~|~1~|~01/NHS~|~SR 7 17.74 to 20.08 Double microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~058460FD9F0BCA07754FB7072C4DE3479329D71B 111252~|~1~|~1~|~01/SAF~|~Realign the skewed intersection of Kirby Ave and Bruce Ave.~|~21 - Safety~|~FA997CE50BC55F1E4A7757092E67186E6D3BE674 86157~|~1~|~1~|~01/STR~|~Structure replacement WAS 26 19.16, SFN 8401055. Funding 80/20% Federal/State.~|~44 - Other~|~2C24064215E5F7CCDCF7A27A959DF29FBBF78B40 113723~|~1~|~1~|~01/SAF~|~Various intersection and minor access management improvements on Harrison Avenue from New Haven to West Road.~|~21 - Safety~|~E6D2FFD3D2963E241C551365FBCFA209EBC3BB20 113831~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~157744331A77D8F1750E911C78FF86E63BBE1A42 84387~|~1~|~1~|~01/STR~|~STP Rural chip seal project~|~47 - Bridge Preventive Maintenance~|~29033091BD51404D2D7E1497541196D5FC577DA4 93656~|~1~|~2~|~02/S<2~|~State and federal funds from the District Preservation Program budget. For work inside the Van Wert Urban Area but outside the City of Van Wert. No local funds. On left side of US 224 from the Van Wert Urban Boundary at 9.26 at Liberty Union Road to the end of the project at US 30 and on the right side of the road from the corportation limits of the City of Van Wert at 9.34 to the end of the project at US 30.~|~05 - 4R Maintenance - Resurfacing~|~3D1854A81444CDB4DF623E577512E67CEACC1F67 93656~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. Rural STP. On US 224 from the beginning of the project at 0.00 to the Van Wert Urban Area Boundary at 9.26 at Liberty Union Road. For work outside the Van Wert Urban Area. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~42F2AA04129408F8B73937978E0BFFEF952ADFF1 93656~|~1~|~3~|~03/S<2/VAN~|~Federal funds from the District Preservation Program budget with the 20% match provided by the City of Van Wert. Resurfacing work on US 224 on the right side of the road from the Van Wert Urban Area Boundary at 9.26 to the corportation limits of the City of Van Wert at 9.34. Work is both inside the Van Wert Urban Area and the City of Van Wert.~|~05 - 4R Maintenance - Resurfacing~|~81A03531E5CA174C6FDD358AA58BA4708F122136 93937~|~1~|~1~|~01/NFP~|~100% State Funds (4MP7) for district wide auxiliary pavement marking.~|~21 - Safety~|~65FAC5CE25FD7733EA174997EF39736495E53F7B 125520~|~1~|~1~|~01/BRO~|~Plan split to program project. Update when scope is known.~|~10 - Bridge Replacement~|~72DA17F192327223C25CFC89ACCC9DD23B8B349C 96838~|~1~|~1~|~01/BRO~|~Type B Emergency Bridge Expansion Joint Repairs~|~13 - Bridge Rehabilitation~|~A9FD3E0ACBE929BDF5AE3F4F8BB4B86025A9FC3A 104107~|~1~|~1~|~01/NFP~|~Plan split~|~44 - Other~|~94563AD4DD251C0512418C24C259F009A42D5C30 108041~|~1~|~1~|~01/IMS~|~Crack seal minor repairs: MOT IR 70 SLM 6.71 to 10.79~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDB492BFEE3CA4EEA55216294FA220FCBF0F530D 119886~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-E~|~63 - Electric Vehicles & Charging Infrastructure~|~5EB90E434527D844FEA88DD846AE641BC27DD880 114283~|~1~|~2~|~02/IMS~|~Plan Split for mowing in MOT Co~|~99 - State Preventative Maintenance~|~C13E0190BB7468FD1C4A6A04D81A3D1D46D6AF77 114283~|~1~|~1~|~01/IMS~|~Mowing contract for routes in D8~|~99 - State Preventative Maintenance~|~BC0BEBF90ECA3F4D339E6222FE2224438D10C11D 125590~|~1~|~1~|~01/IMS~|~All work included in this plan split.~|~44 - Other~|~276C18C9B9691215D7D5CF51B976199EDA9F9F4C 94588~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt inlay treatment. WAS 7 39.00-49.43. NHS route funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~F5902182996ECD77B439B29B4DF3B71687C4928C 92823~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on NHS route~|~05 - 4R Maintenance - Resurfacing~|~AE4C225A2659A5F05595184C3D3AF34CB8CEA056 111650~|~1~|~4~|~04/STR~|~AC Overlay w/Rpr RIC-42-0.00 to 2.79 Rural Section~|~05 - 4R Maintenance - Resurfacing~|~F4700322642FDEDE401EA7191D130B80D386F828 111650~|~1~|~5~|~05/NHS~|~Bridge Work - CRA US 30 21.188 SFN 1701886Preventive Maintenance: Deck patching (concrete) (049)~|~13 - Bridge Rehabilitation~|~BDB1C6F46C116DA0B1A672C893324DC6B054732F 111650~|~1~|~6~|~06/S5K~|~Bridge Work CRA SR 61 3.608 SFN 1701924: Preventive Maintenance Expansion joint repair/replacement (048) Reactive Maintenance Deck patching(conc) (049) CRA SR 61 4.586 SFN 1701959: Preventive Maintenance Expansion joint repair/replacement (048) Bridge railing upgrade/repair (061)CRA SR 61 6.850: Preventive Maintenance Drainage system cleaned/repaired (028) Expansion joint repair/replacement (048) Bridge railing upgrade/repair (061)~|~13 - Bridge Rehabilitation~|~A905AEEDC5281C5C412C620017FDADE945E3AE61 111650~|~1~|~7~|~07/SAF~|~Centerline rumble stripes on RIC-42-0.00-2.799~|~21 - Safety~|~FFFF6AE4E9042448ADC2B22F364AB45B215CB702 111650~|~1~|~1~|~01/S5K~|~Federal/State: Urbanized Area STP 5,000 - 49,999 Outside Corp. Limit (Paving Items):~|~05 - 4R Maintenance - Resurfacing~|~1F6AC506C4FCCC041EFBC51871F8D6AC4371202E 111650~|~1~|~2~|~02/S5K~|~Federal/Local Urbanized Area STP 5,000 - 49,999 Inside Galion Corp. Limit (Paving Items),Priority 1 100% 4BG7 is for alternate bid pavement marking items if the city agrees to them~|~05 - 4R Maintenance - Resurfacing~|~27F71A8EC1BE35773215D16F1A4B9D59AE715B4F 111650~|~1~|~3~|~03/S5K~|~100% Local: Urbanized Area STP 5,000 - 49,000 Inside Galion Corp. Limit (100% City Items Such as Pavement Repairs, Curb Ramps, Curb Repair etc.):~|~05 - 4R Maintenance - Resurfacing~|~D912CEED7068BCFCED7393C0CFDE4190A4CD5BB0 111650~|~1~|~8~|~08/S50~|~Paving Urbanized Area STP 50,000 - 200,000.~|~05 - 4R Maintenance - Resurfacing~|~C0E81E312EE8945DDD41CC2B8BAD5C5CE8C218D1 114891~|~1~|~1~|~01/S>2~|~Columbus urban area plan split.~|~05 - 4R Maintenance - Resurfacing~|~0E3B7A651601A7674F124C2EB2057B9F8D97BEC1 103774~|~1~|~1~|~01/NHS~|~Emergency culvert & pavement repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2F12063DCBC607E68E63C57E43923BAD794AF119 109738~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~247CF23E27E58CFFF2798B8A6390C6778A102D3D 113238~|~1~|~1~|~01/NFA~|~Rehabilitate and resurface various roads and parking lots within Winton Woods Park. The work shall consist of pavement planing, pavement repairs, asphalt concrete surface course, parking blocks, and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~CE5D110F2534D6D7F72C0C3F5E2398AA62D30882 109846~|~1~|~1~|~01/NHS~|~SCI 23 2.67-10.57~|~05 - 4R Maintenance - Resurfacing~|~3CF233160242887959037C193BDAD4CD62022412 126913~|~1~|~1~|~01/BRO~|~Replace superstructure on bridge carrying SR 39 over Cold Spring Run.~|~13 - Bridge Rehabilitation~|~921ED1C1F0CDD3961424CC6F5BCE2B2050C2EEDB 98224~|~1~|~1~|~01/NFP~|~ District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Replacement of RPM's on various routes in District 5 as part of three year cycle.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~60BDDE5B270D891E5BDD35C9A4E9A54CFF2E2F86 126322~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~~|~BFA7F61963B5AD25F756632A1F6C78E68D2620B4 83987~|~2~|~2~|~02/S<2/HIG~|~Hobart/Carl Smith Drive Urban CollectorPart 2 w/City providing local matchFrom Homestead Road (SLM 0.69) to US62 (SLM 1.20).~|~01 - New Construction~|~413B32B8D71BE420E70F0346D55C3AF230DB75FB 83987~|~1~|~1~|~01/S<2/HIG~|~HIG Hobart/Carl Smith Drive Rural Major Collector SLM 0.00 - SLM 0.69Part 1 w/County (Co) providing local match.From SR73 to Homestead Road.~|~01 - New Construction~|~551060000A73951E616B8532B4A9B9D8FC20A0DE 83987~|~3~|~3~|~03/S<2~|~Part 3 will include intersection improvements at CR 1159 0.75-0.85(SR73/Harry Sauner Road) & CR 10 0.00-0.04 (Harry Sauner Road/ Carrytown Road) as well as upgrades to Careytown road north to the new construction of the roundabout.~|~01 - New Construction~|~62C8120C454ADB856B131A9CBFC44B4650E6CDCF 93213~|~1~|~1~|~01/STR~|~General system paving of DEL-37: 21.94-29.08~|~~|~48FEEDAE634B5837DE54A892735708B6661E6F57 105437~|~1~|~1~|~01/IMS~|~Deck repairs and patching on structure FRA-71-1526L~|~13 - Bridge Rehabilitation~|~81392E5505FABC75CC2BCA7611A2C667014999DE 111367~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer FY2024 project to install new and upgrade existing guardrail on various county roads. 4HB7 - See cap comments.~|~21 - Safety~|~80345453B6C2DBF9BEEFFF6C583EAB563044FA5C 119864~|~1~|~1~|~01/S5K~|~All Work Included in this Split~|~66 - Resilience Improvement - Highway Project ~|~EEED824D3A03157F1E218D3815ADCD9577AFAF72 91624~|~1~|~1~|~01/IMS~|~Spot pavement repair on FAY-71, FRA-70, FRA-71, FRA-270, FRA-670, MAD-71, PIC-71~|~05 - 4R Maintenance - Resurfacing~|~06AFADF26A44F833B99A205539962991D7DF8BEF 93101~|~1~|~2~|~02/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~B740E08813A6AA711CE5E1C164268D0BED43BD5E 93101~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C96851238822BB0F6FABAD19235864BDB2069E7B 93101~|~1~|~3~|~03/IMS~|~Minor bridge rehab > 10' to 20' span and culvert work.~|~04 - Reconstruction - No Added Capacity~|~363D4EB45274CA17D84A1AB3C4DA30F5A943C651 93101~|~1~|~4~|~04/NHS~|~MSE wall repairs relating to the linked structure.~|~47 - Bridge Preventive Maintenance~|~C04EB8DA6BD9B24B83C61F14DB72ABDC4467A909 92262~|~1~|~1~|~01/STR~|~Culvert Construction/Repair~|~44 - Other~|~19A7A8DF26EDDDB3422CE90E966BA853F0EAE2BC 112179~|~1~|~1~|~01/SAF~|~Various Safety measures in the City of Sidney.~|~21 - Safety~|~F6DBFFB079818F6280727298282D566C4FE5955B 101173~|~1~|~1~|~01/STR~|~Microsurfacing on rural routes: DAR SR 49 SLM 32.02 to 35.96 & DAR SR 121 SLM 28.87 to 29.54~|~05 - 4R Maintenance - Resurfacing~|~0FF0D17B058CB263A652F9740CB52118F668C748 121982~|~1~|~1~|~01/NHS~|~Repair damage to Gender Rd bridge over US 33 from a vehicle hit~|~13 - Bridge Rehabilitation~|~288E7FB5849E0640A0FD437A26844B21290EB340 100620~|~1~|~1~|~01/STR~|~Plan split for rural portion of CLE SR276 SLM 1.21 to 5.28~|~05 - 4R Maintenance - Resurfacing~|~3CBEF06200293CFDEC245437B48CDB5BD7A75371 100620~|~1~|~2~|~02/S>2~|~Plan split for urban portion of CLE SR276 SLM 0.51 to 1.21 and 5.28 to 6.10~|~05 - 4R Maintenance - Resurfacing~|~9E213AB82FED5D2CC0256E863F210A11EBD0ED9A 100620~|~1~|~3~|~03/STR~|~Replace culvert CLE-276-0453 - Install new culvert - CFN 1976427.~|~44 - Other~|~5DBC63033963F26B502CC30929164AE6678999A7 127057~|~1~|~1~|~01/S5K~|~Roadway improvements on St. Clair Ave. utilizing Small City (4B97) Federal funds at 80%.~|~05 - 4R Maintenance - Resurfacing~|~C6F356900827F19D0E10A201FD873B7913418000 117362~|~1~|~1~|~01/BRF/Ash~|~Beams Only thru CEAO~|~13 - Bridge Rehabilitation~|~9BC50ABC55C0499C339ED24CD0C9C4B087F7D522 105179~|~1~|~1~|~01/S<2~|~Micro surfacing from SR 7 to SLM 4.20~|~05 - 4R Maintenance - Resurfacing~|~7C02C651D27389904F4473E4BC5B52AE69ACAA62 105179~|~1~|~2~|~02/STR~|~Micro surfacing from SLM 4.20 (CR 3) to CR 4~|~05 - 4R Maintenance - Resurfacing~|~56FA3143AE837E23C0BD3242DB1531C8B6706A30 111482~|~2~|~2~|~02/S>2~|~Replacement of type A anchor assemblies: Large Urban Areas~|~21 - Safety~|~8B0EF348AA1692B3585363393F7AC71FDDC6067B 111482~|~3~|~3~|~03/STR~|~Replacement of type A anchor assemblies: Rural Areas~|~21 - Safety~|~D948B390BFFAFA535D066B49EC0E26F031FD204F 111482~|~1~|~1~|~01/NHS~|~Replacement of type A anchor assemblies: NHS Routes~|~21 - Safety~|~26DC1B8F93E930AA3E06C64306A313D0D7264F58 93625~|~1~|~2~|~02/STR~|~For work on sections of road classified as a Rural Major Collector. Funding is state and federal funds from the District Preservation Program budget. All work on SR 66. Work on SR 117 from the west corportation limits of Spencerville Road to the Lima Urbanized Area Boundary at SR 501 which is at 10.78. Work on SR 501 in Allen County from the Auglaize County line to the Lima Urbanized Area Boundary at Breese Road which is at 2.01.~|~05 - 4R Maintenance - Resurfacing~|~A255654DE32497DFD8219897AD65B77F80A2D1A1 93625~|~1~|~1~|~01/S<2~|~For work inside the Lima Urbanized Area but outside the City of Lima. Funding is state and federal funds from the District Preservation Program. No local funds. Work on SR 117 from the Lima Urbanized Boundary at SR 501 (10.78) to the end of the work on SR 117 at Seriff Road. Work on SR 501 from the Lima Urbanized Boundary at Breese Road (2.01) to the end of SR 501 at SR 117.~|~05 - 4R Maintenance - Resurfacing~|~04FA3F7C47E7E582F18E14FB6773746D07F09524 118813~|~1~|~1~|~01/S5K~|~Slope/erosion repair along ATB SR 531 by construction of 3 sheet pile walls.~|~70 - At-Risk Coastal Infrastructure - Highway Project~|~5EBB773F0BF6184718784F542B7EF13FC395136E 120846~|~1~|~1~|~01/IMS~|~Repair of median concrete walls. ~|~17 - Construction Engineering~|~ED18BDF8B5C74BE748635DA87922506348CFEBB6 107911~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~7CAA91E1FA5E81926DEACE82C7D6ED1B3D24DB1C 107911~|~1~|~2~|~02/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~558DA472E6AC533DDEB784430210D02F8C54BCF9 107911~|~1~|~3~|~03/S<2~|~Urban Area (STP<200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4BEAC5713420FCCDA3CA3CCAA1C4FC6FB22799DA 107911~|~1~|~4~|~04/S>2~|~Urban Area (STP>200,000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0B3986C39FD4A529013EA270E035ED19CA193DAB 107911~|~1~|~5~|~05/NFA~|~Not on the fed aid system plan split~|~05 - 4R Maintenance - Resurfacing~|~770A58B00143982BA719EC5CA39894CD2BE4FF29 118969~|~1~|~1~|~01/SAF~|~Plan split for reflective/wet reflective pavement markers.~|~21 - Safety~|~83A01A60E7D60BCD1859473C16928696A1686136 89444~|~1~|~1~|~01/IMS~|~Pruning, Tree/Bush Removal~|~44 - Other~|~AE303E0EE9D0F647162E5F760CF4863C5F701342 116872~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~72010E9523C9ABA7ACFC32D69F6D5B98D1B27939 88685~|~1~|~1~|~01/STR~|~Pavement marking throughout the District. Funding classification splits not necessary with 4CP7 funding.~|~21 - Safety~|~E2B91925C08019688699D032FC39BC2DD46D9962 123610~|~1~|~1~|~01/S5K~|~Plan split for STP 5,000-49,999~|~05 - 4R Maintenance - Resurfacing~|~A40B12BCC9F4DFA73D2ED128BA98E0ADDD62C669 109901~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 78 13.00. DSR MRG-002. Funded 80 federal/20 state ER.~|~~|~0E066E1333DD1234EA5620B07D745640582A138F 100251~|~1~|~1~|~01/MPO~|~Rehabilitate Cedar Road using MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9968757766C9440F84D6EFBCA6DC0D56D901545A 100251~|~1~|~2~|~02/NFP~|~100% local participation for work not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~A056D6F7EC6186660CFC49FF80DC907AA521513C 93244~|~1~|~1~|~01/MPO~|~Widen and reconstruct to three lanes including 8' paved shoulders and improve the alignment to eliminate horizontal and vertical deficiencies. Bridge# MOT CR 166 03.55 will be replaced due to roadway alignment changes. Located Miamisburg-Springboro Pike from Benner Road to Medlar Road.~|~04 - Reconstruction - No Added Capacity~|~D5BB537C1D694A9F773C74B9D8E20DA38A472603 124899~|~1~|~1~|~01/ENH~|~MPO TAP funds~|~28 - Facilities for Pedestrians & Bicycles~|~0632C0CC46AE3191D115942A0E521DBDEDF02DD9 95288~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE CR 32 0.32, SFN 5630851. CEAO funded project. Funded 80 federal/20 local.~|~10 - Bridge Replacement~|~2102BDF46F043C95D5A989742F3F5079514AEF23 13034~|~1~|~1~|~01/CMQ~|~CMAQ funding for Columbus Traffic Signal SystemExtend system to 320 intersections, replace central computer & software, signal controllers and communications equipment; install fiber optic cable, wireless communications, 20 traffic cameras~|~21 - Safety~|~EE0EFA193799F84B0C34B36B596B67655C670736 105603~|~1~|~1~|~01/SAF~|~Upgrade pavement markings on county roads.~|~21 - Safety~|~6F325C77C98AEE663936CC916BF0E7FE92DA69E4 127267~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 213 over Yellow Creek.~|~13 - Bridge Rehabilitation~|~EC6A17E41A3D6C2482636150260CA3DD7872F7BB 91969~|~1~|~1~|~01/STR~|~ADA SR136 9.39 - 18.95 ResurfacingSR136, begin project at its intersection with SR125, north and terminate within the Village of Winchester. 0103284 (10.78) Pave Thru 0103349 (11.61) Pave Thru 0103470 (17.33) Pave Thru 0103489 (18.37) Pave Thru 80 Fed/20 State ~|~05 - 4R Maintenance - Resurfacing~|~C00FC442BC7EB06E2299E74B7BB52C609B1DF1B1 91969~|~1~|~3~|~03/STR~|~Bridge Reconstruction on ADA 136 11.14 (SFN 0103306)~|~04 - Reconstruction - No Added Capacity~|~0CCBE76E19DFD3E8B07041A35A9D3EF1F73EA422 91969~|~1~|~2~|~02/STR~|~ADA SR136 Brdg rehab0103365 14.46 0103454 14.56 80/20~|~13 - Bridge Rehabilitation~|~E7F2C3EEE3E67FE9AAD8E0DADC2BC9DA1C98ECD4 116712~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~9F6C93B20E4CECEB40F2A471852E907D3C311562 110873~|~1~|~1~|~01/NHS~|~Mine subsidence repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FF4EE18E7AD69EEF529DAEFA39F71802A6095CBD 112926~|~1~|~1~|~01/NHS~|~NHS Plan Split: FAY-35-0.00-2.58~|~05 - 4R Maintenance - Resurfacing~|~76D61DA38EE97D24F99BE5A7FB1479BCECCE0A68 112926~|~1~|~2~|~02/STR~|~Rural Plan Split: FAY-435-2.29-2.52~|~05 - 4R Maintenance - Resurfacing~|~EA915DA7E93C077811C27FCFB3925343FCF97F29 112926~|~1~|~3~|~03/S<2~|~Washington Court House Urban Area Plan Split: FAY-753-12.78-13.11~|~05 - 4R Maintenance - Resurfacing~|~F01D0E56E5C629F4A69BD7DCB1AE8FEF8FF516EC 101434~|~1~|~2~|~02/S<2~|~Paving SR 31 from 2.09 to 2.77. Within Urban Area, but outside Marysville~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2C89D99D66B81B43E30A0CE2FE390E8F725BDF3 101434~|~1~|~1~|~01/STR~|~Paving SR 31 from 2.77 to 7.80 and 15.65 to 20.38 and SR 347 from 4.22 to 8.26~|~05 - 4R Maintenance - Resurfacing~|~8457C49910975A03F94410371D100A23900C8CD8 103092~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 144 12.40. DSR ATH-002.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7FEF3406AD6CF7CCCAE20CE840009DB2DEF8BC2D 116650~|~1~|~1~|~01/NHS~|~CRA US 30 09.53 to 15.80.~|~05 - 4R Maintenance - Resurfacing~|~8D8C4A77C991E9505A80B80139762C64E340182F 116650~|~1~|~2~|~02/NHS~|~Bridge repair / maintenance to be completed with resurfacing project~|~13 - Bridge Rehabilitation~|~2A72EF7776A83B99F1783ACA5435201AAC9573D7 104039~|~1~|~1~|~01/BRO~|~Emergency bridge repair work eligible for Local Major/High Cost Bridge funding.~|~13 - Bridge Rehabilitation~|~213D6AD772844909E9BD029C9A91A3EB4AA523EC 104039~|~1~|~3~|~03/BRO~|~On-going services during construction.~|~17 - Construction Engineering~|~BDC789CA50CF5E87A8B5A2B66A249A1EBB7DEB1C 104039~|~1~|~2~|~02/NFP~|~100% local participation for bridge repair work not eligible for federal-aid.~|~13 - Bridge Rehabilitation~|~D3F5C1B7D416274D6A851AE862D31A2DFC92FDAD 84506~|~1~|~2~|~02/BRO~|~Replace Roberts Rd bridge decks over I-270, qualifies for BR funds:2509636 FRA IR270 10.49 Intersect: Under Roberts Rd Eb Cr282509660 FRA IR270 10.5 Intersect: Under Roberts Rd Wb Cr2802/BR/BR/~|~13 - Bridge Rehabilitation~|~1E426E19E6DCB049E878418EED433AF983FA15A9 84506~|~1~|~1~|~01/SAF~|~Upgrade Roberts Rd interchange with safety funds up to safety cap for all phases, then use D6 funding for remaining funds01/SAF/OT/~|~21 - Safety~|~62D228A15C4F1DA9557634AA00F9B7B0DE4D1CD5 96747~|~1~|~2~|~02/S>2~|~Plan Split for 100% City items. These items include pavment repair, curbs, curb ramps, utility adjustments, and workzone striping.~|~05 - 4R Maintenance - Resurfacing~|~351C73D5922141AFA0814F2CB1470DA88A126C37 96747~|~1~|~1~|~01/S>2~|~Plan split for items split 80% State and 20% Local. This will inlcude the planing, new asphalt, and final striping. Pavement repair and curb ramps are not included.~|~05 - 4R Maintenance - Resurfacing~|~61DE48EB26D0AF243DEEA6174608FA96ACDB7BCA 96747~|~1~|~3~|~03/NHS~|~Plan Split for the 80/20 split items on SR 4 between SLM 7.97-8.25 (maple to dayton)~|~05 - 4R Maintenance - Resurfacing~|~10F2B977249F87843BFA58E33B7DD62CEC24F19F 96747~|~1~|~4~|~04/NHS~|~Plan split for the 100% City items on the SR 4 section between SLM 7.97-8.25~|~05 - 4R Maintenance - Resurfacing~|~6B5699F62D5EA20C223C7A9193D72D0C0A94070A 110549~|~1~|~1~|~01/STR~|~Rural plan split in the Village of LaRue - MAR 37 from 7.29 to 8.31~|~05 - 4R Maintenance - Resurfacing~|~697C4DC1BCD5039DB9BC77803BDF8EAAA6F1FBE9 98466~|~1~|~1~|~01/STR~|~SmoothsealERI-6-0.00 to 3.64~|~05 - 4R Maintenance - Resurfacing~|~0C12C7AB30F2C0553DB4CACD86A1ABC3AB5DB09A 98466~|~1~|~2~|~02/STR~|~Fine Graded Asphalt Concrete Surface Course and Safety Edge using Ontario Trap Rock ($30,0000 of safety funds approved for the Ontario Trap Rock)~|~05 - 4R Maintenance - Resurfacing~|~8293710477FD1BB30618DC8B1B8EAF3D42F0B62F 105938~|~1~|~1~|~01/MPO~|~resurfacing work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~17343378C06A3B3FCE138F19C9573F9060970A86 105938~|~1~|~2~|~02/NFP~|~Split for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~978A1FC7AD2DD9849312247389D0E4C51D730052 102971~|~1~|~1~|~01/NHS~|~AC Overlay without repairs on NHS route: MER SR 29 LSM 9.17 to 11.19.~|~05 - 4R Maintenance - Resurfacing~|~F48810ACED278C04FAFEE5F31AB64DFA0BEBE602 102971~|~1~|~2~|~02/S<2~|~AC Overlay without repairs on Sm Urban route: MER SR 29 SLM 8.17 to 9.17.~|~05 - 4R Maintenance - Resurfacing~|~1103A131BF34EEA688B5EBCC0E40276540C830F3 127128~|~1~|~1~|~01/NHS~|~Plan split for building demolition~|~44 - Other~|~4AA70F13D5FD326C8357BD82A4E33C6DE74D5320 124492~|~1~|~1~|~01/NFA~|~Created for J&C TID involvement.~|~44 - Other~|~CB5577C2ACD7245F5AD78156018A2AC87FB88D46 91392~|~1~|~1~|~01/STR~|~General system resurfacing on SR-47 from SR-31 to Richwood, then SR-37 from SR-47 to SR-47, then SR-47 from Richwood to DEL County line. DEL-42 from UNI CL to SR4.~|~05 - 4R Maintenance - Resurfacing~|~75CC2958483F5F3733691C6D7F43C922287CE8CE 114579~|~1~|~1~|~01/NHS~|~Rockfall repair project. WAS 7 39.12. Work includes rock bolts and shotcrete.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D858E21C6430BE1DE308A4820474B15B5DB1BB3 110286~|~1~|~1~|~01/NFP~|~Cracksealing along various routes~|~99 - State Preventative Maintenance~|~00457FE6F8E4D4F6C4D27CE9700ABB90C39947C5 104884~|~1~|~1~|~01/NFP~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~C94912D1EE6C943F5BE90B46AC403A2E6539961B 94263~|~1~|~1~|~01/S<2~|~FY2016 Urban Paving in the City of Trenton on SR 73. This Plan Split is the 80% ODOT and 20% City items on the Urban Portion of SR 73. From SLM 14.98 to 16.76.~|~05 - 4R Maintenance - Resurfacing~|~05306F0135F90150CCA605AA425E4D120E4BE1C8 94263~|~1~|~2~|~02/S<2~|~FY2016 Urban Paving in the City of Trenton on SR 73. This Plan Split is the 100% City items on the Urban Portion of SR 73. From SLM 14.98 to 16.76.~|~05 - 4R Maintenance - Resurfacing~|~39EDAB2987EBBA40DB5B26545092389ED9786646 124940~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funding.~|~05 - 4R Maintenance - Resurfacing~|~B405BE62BC4FBC2B6A4EEC582054CED8675EB014 121718~|~1~|~1~|~01/NHS~|~Asphalt Concrete overlay including bridge maintenance ERI-2-24.503 to 30.494~|~05 - 4R Maintenance - Resurfacing~|~AEB9FF9D6E6564C0D46422980E6E1723FC6D526B 121718~|~1~|~2~|~02/BRO~|~Bridge work.~|~13 - Bridge Rehabilitation~|~BC28859A4F3045981B004F11AA4A74F67FD31591 83438~|~1~|~1~|~01/NFP/CRAA~|~Alum Creek Drive Extension project - currently unfunded~|~01 - New Construction~|~077051DAC58BFD3255E2E0CFD4DA07A4BC94E23D 115176~|~1~|~1~|~01/BRF~|~Removal and replacement of the bridge carrying the Great Miami Recreation Trail over Sycamore Creek in Miamisburg.~|~28 - Facilities for Pedestrians & Bicycles~|~DC668AF3591DEE3E5E7F8D940B104D72F066993B 126287~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~2D2A9462EE51B26F5469A9E65CC117ACDF81E496 119990~|~1~|~1~|~01/S>2~|~convert a two way stop controlled intersection to a single lane roundabout at Wilmington Dayton Road and Centerville Road~|~04 - Reconstruction - No Added Capacity~|~91C7F42A7EF24A651BA80785B57169D76D1CED5C 108970~|~1~|~1~|~01/IMS~|~Emergency catch basin repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A4A0F22A9790D022BECDA5D2FCFF3D2615322DFA 92146~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 2 years mowing contract~|~31 - Landscaping & Other Scenic Beautification~|~2A54E281C5BCA49805776D00156373DBA1CA0AFF 108470~|~1~|~1~|~01/SAF/LANC~|~City of Lancaster Safety Program Funding - 4HJ7 (90% Federal) / 4BG7 (10% Local) - See CAP Comments - Improvement to Ety Road~|~21 - Safety~|~CE6D85DFCCD94681FF05EF60C0C8947A93F991AC 108470~|~1~|~2~|~02/S<2/LANC~|~City of Lancaster Local Funding - 4BG7 (100% Local) - No CAP - Traffic Signal at Columbus Street and Ety Road~|~~|~439A786DD18F2DF0D77007BF583F15278CAA6D0B 108470~|~1~|~3~|~03/SAF/LANC~|~City of Lancaster Safety Program Funding - 4HJ7 (90% Federal) / 4BG7 (10% Local) - See CAP Comments - Sidewalks along Columbus Street - Additive Alternate~|~~|~BD848870CC32F6779FBB74BE9E2F592A6F7B1170 106248~|~1~|~1~|~01/NFA~|~The City will reconstruct Campbell Rd between Production Dr. and Featherwood Dr approx. 1600 linear feet to raise it three or more feet above flood conditions, improve the truck turning radius at Industrial Dr interaction, and related improvements.~|~01 - New Construction~|~D20A182D0B0E6725779ECCE0CDB3C0E8F15B0CA7 116452~|~1~|~1~|~01/S5K~|~Overlay in Ross County.~|~05 - 4R Maintenance - Resurfacing~|~60EC69334473010EBB4E5E3F162FE63FA6AB67A6 116452~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~9519C769A85C4FADDF63DDC12C25A905712283D0 116553~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~3AF97C41E59B69117D50CEF98A7253D2578400E0 111025~|~1~|~1~|~01/BRF~|~Local bridge replacement~|~10 - Bridge Replacement~|~BA6C1C3A8F8E46DC1655F6B0554745242585C1CD 125738~|~1~|~1~|~01/NHS~|~Bridge work throughout District 5.~|~13 - Bridge Rehabilitation~|~0A611F429DA6FDE3BFC7BA195F57CBCC6A498EF5 106923~|~1~|~1~|~01/NFP~|~ODNR funded project at Monroe Lake - paving, gravel and culvert work. Funded 100% state ODNR.~|~05 - 4R Maintenance - Resurfacing~|~B65A1549E16A0E555AD14BE23797E88A2A23A6AE 109648~|~1~|~1~|~01/STR~|~Resurfacing HAS-800~|~05 - 4R Maintenance - Resurfacing~|~54FAA6F2B7F106DC0D979900FA4928848C60DDCB 95567~|~1~|~1~|~01/IMS~|~Demolition of remaining stearns and foster buildings bounded by I75,Wyoming Avenue, Shepherd Lane and Brown Street.~|~03 - Reconstruction - Added Capacity~|~BD9DEB41D65EFC00E307BAC987D97FFE2AB6B08D 100930~|~1~|~1~|~01/NHS~|~This plan split is for NHS routes.~|~05 - 4R Maintenance - Resurfacing~|~96847171397959E19453C4C226AE5960DED143CB 100930~|~1~|~2~|~02/STR~|~This plan split is for rural routes.~|~05 - 4R Maintenance - Resurfacing~|~C0DA757F7F1015092C7C5C43A9238B3CB238F889 125472~|~1~|~1~|~01/MPO~|~Plan Split 1 for use on federal aid system~|~21 - Safety~|~F0A0CD6C8580B4EE64261E0D143A8F4909A60D1F 125472~|~1~|~2~|~02/MPO~|~Plan split for non federal aid system items~|~21 - Safety~|~1CD3A2F1D34D37EBE33CAAABCD5FCFA22D0E55E4 109727~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~7193BAC4F91E4BF84F2C7E5D3E191C6FD8A7FBC0 125038~|~1~|~1~|~01/BRO/ALLI~|~Bridge rehab or replacement, TBD.~|~13 - Bridge Rehabilitation~|~BE3DEFD0BA8B8B52D6DB9399F228D23F45FDE7FE 91582~|~1~|~1~|~01/STR~|~Brdg replacement. 2.11 miles East of Adams County Line. 7303297 SCI SR125 2.11 Intersect: Rocky Fork80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~470408352FF0225B4CDB81870C4B21971D6E0161 93018~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 33-12.79 to 17.39~|~~|~01707093FE3731C04F836A9B25ED7369D48ABEFF 93018~|~2~|~2~|~02/NHS~|~"02/NHS/BR/ " - plan split 02 for FAI-33-12.79~|~~|~723723B6060D0F127ECA5AA58124C0CEFA2709E1 93018~|~1~|~3~|~03/NHS~|~Established "CENG 02" for $2927.10 for FAI-33-12.79 using Group A project greater than $1M use 3%~|~~|~8095A6B544BD871687731644DF31A48DF7064074 112757~|~1~|~1~|~01/MPO~|~Resurfacing of Riddle St from Meridian St to Liberty St in the City of Ravenna.~|~~|~53C6281A4541E9EB045A3FB25263791D0DEDBBB2 105317~|~1~|~1~|~01/IMS~|~Plan split for deck replacement and structural steel painting~|~~|~335EFBCD62A9A083F60DFE275B8B121C0CF2D7E3 114986~|~1~|~1~|~01/STR~|~D3 Pruning~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E2E22D80408184FCE366A1B287816A7C1788FA5 96323~|~1~|~2~|~02/STR~|~Rehabilitation of culvert - SFN 6401422, PER SR 93 7.656~|~04 - Reconstruction - No Added Capacity~|~0A7BC3B35CAAF5B3A7DC55CB14D38F7D5EF1790E 96323~|~1~|~1~|~01/STR~|~Rehabilitation of three structures - SFNs 6401295, 6401325, and 6401392~|~13 - Bridge Rehabilitation~|~6D97A0B3E503AED2E384C6F98E56C6C052A4B3B1 102796~|~1~|~1~|~01/ENH~|~Construct Hike and Bike Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~1D79D66CC7597A567A55026386247C9FD1D441F9 114420~|~1~|~1~|~01/S<2/HAS~|~Pavement rehabilitation and drainage improvements project funded at a maximum of $500,000, using 100% (4SH7) Local Roads Oil and Gas Shale Program.~|~04 - Reconstruction - No Added Capacity~|~89D655D33505D75A6C9833F89B2B387DC275F3E0 99738~|~1~|~1~|~01/CMQ~|~Plan split covers CMAQ funded construction contract for signalization and interconnect at 11 intersections within Grandview Heights~|~21 - Safety~|~7478C185BEA51875A3F3BA475761A5C0BB521F36 99738~|~1~|~2~|~02/CMQ~|~Costs associated with non-eligible items (due to unwarranted signals).~|~21 - Safety~|~8A01CEAD8FEBA0B4F78D552090EAE11480157440 107820~|~1~|~1~|~01/NFP~|~Improvements at the Ohio Expo Center~|~44 - Other~|~53A7F5932C41C262B5830B636CE828AF3CBF476E 117536~|~1~|~1~|~01/ENH~|~Preserve & rehab Ohio & Erie Canal Locks 48, 50, and 55 in Scioto County.~|~32 - Historic Preservation~|~61A9CF8947BCF1A38E98984A5707E91AAAC20D6F 89473~|~1~|~1~|~01/BRF~|~?01/BRF/BR/TUS? - Replace bridge over Big Stillwater Creek, 0.3 mile N of CR 28. Project will include approximately 100' of roadway realignment.~|~10 - Bridge Replacement~|~3B011BD4F0A26634C5D8FF1B83175B0E316EF49F 116214~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into roundabout~|~21 - Safety~|~62127D5432722CF2CE6D5EEBEA3E4F97BC7FEAE0 88693~|~1~|~1~|~01/STR~|~Proposed work consists of resurfacing of the existing roadway with asphalt concrete in Shelby County on SR 29 (0.00) SHE/AUG CL to SLM 3.82 (JCT 29/274). SR 274 0.00 (SHE/AUG CL) to SLM 1.14 (JCT 29/274).~|~05 - 4R Maintenance - Resurfacing~|~490F2709E3AD81B3CD38C811A2FDF50059F36F9A 113230~|~1~|~1~|~01/NHS~|~Roadway milling and resurfacing including pavement markings and manhole adjustments.~|~05 - 4R Maintenance - Resurfacing~|~3530DF0DD7D457B0AD2B0B80208A60EB7AEE85D9 112590~|~1~|~1~|~01/NFP~|~All work at the EXPO Center~|~44 - Other~|~252161B4CB03CCE0640CEEE834AA024133FC0E29 108141~|~1~|~1~|~01/MPO~|~Resurfacing of Valley View Rd from SR 8 to Old Eight Rd.~|~05 - 4R Maintenance - Resurfacing~|~30D5A582C198F9CBF96072D46B8141B8554BBAEC 108141~|~1~|~2~|~02/CMQ/SUCE~|~Intersection improvement at Olde Eight Rd and Valley View Rd.~|~04 - Reconstruction - No Added Capacity~|~14986A3B2D541F5D2B0A83A4E651053685CB15E4 102948~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~04 - Reconstruction - No Added Capacity~|~AB03E2F193EBD401C08957D52D2B9A4577188470 120825~|~1~|~1~|~01/CMQ~|~Plan Split for CMAQ eligible scope.~|~21 - Safety~|~E42BC2E0678C55A411A70DC0494DF261DAA9428F 109711~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~2564FED4706DDAC02EA6A4D6FB82857C975FC42E 91024~|~1~|~1~|~01/SAE~|~PAVEMENT MARKINGS~|~21 - Safety~|~EB799397EE50C8A6BA2BA45C47B8CF2DA55D1C50 90691~|~1~|~1~|~01/MPO~|~A TMACOG enhancement funded project to build bike path at LUC SR65 5.22-5.33~|~28 - Facilities for Pedestrians & Bicycles~|~56B599D90375BED669C6E572D27B314749513029 114459~|~1~|~1~|~01/STR~|~Resurfacing US 62~|~05 - 4R Maintenance - Resurfacing~|~F3EE7CE87F6AACA752CBB6271AD31849D8D84540 104792~|~1~|~1~|~01/S<2/HEAT~|~City of Heath LCATS STP Funding - 4TA7 (Federal 80%) / 4BG7 (Local 20%) - See CAP Comment - Resurfacing with related work on Thornwood Drive from Lees Road to South of the Hallie Ln/Central Parkway W intersection~|~04 - Reconstruction - No Added Capacity~|~FADD4EE1FA3B9CDD3F8ADFE4AA1A798F313D7F15 95398~|~1~|~1~|~01/BRO~|~The substructure work will increase the vertical clearance, the existing beams will be set back on new bearings, with a new bridge deck.~|~13 - Bridge Rehabilitation~|~826A1A3D868212B9BFF3CA8066357DA6692C23DD 90948~|~1~|~1~|~01/SAF~|~This Plan Split is for work eligible for use of the funds from the ODOT Central Office controlled safety program. The safety program cap is $1,200,000 for construction~|~21 - Safety~|~02122A99AB0928E7C5B76B9C09BFECECE007BBC6 102537~|~1~|~1~|~01/BRO~|~Replace deck with new deck for bridge TUS-258-0042 (SFN 7905491). Approach slabs to be replaced.~|~17 - Construction Engineering~|~9F48CAE40FF50658446883066847F4CA15AB057F 95442~|~1~|~1~|~01/STR~|~ROS SR180 Resurfacing Project0.00 - 11.67On ROS SR180, beginning at its intersection w/SR159, and terminating at the corp limit of the Village of Adelphi, it is proposed to perform repairs and resurface the highway. All bridges are pave thru except SNF 7104650 SLM 3.5080/20 split~|~05 - 4R Maintenance - Resurfacing~|~23FE7EF58EC762128667079DADF0E1BD022AEECD 95442~|~1~|~2~|~02/STR~|~7104650 ROSS SR180 3.500 Rehab~|~13 - Bridge Rehabilitation~|~DF8633DE364A9C3AB6381E19169F58EFB69DE15A 99455~|~1~|~1~|~01/NFA~|~Landslide repair by excavation and replacement of slope.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF8AAA3F96BB1608E9C171F0080B75EC4E6A16EF 105552~|~1~|~2~|~02/S<2~|~Asheville-S. Bloomfield urban area plan split PIC-104-15.68-16.62~|~05 - 4R Maintenance - Resurfacing~|~49140C4839009F33A7287B60E08A28AADFA551B2 105552~|~1~|~3~|~03/S>2~|~Columbus urban area plan split: PIC-104-20.70-21.47~|~05 - 4R Maintenance - Resurfacing~|~45AA45CF883751FEC5B12EBDF06C456D802F1D5F 105552~|~1~|~1~|~01/STR~|~Rural plan split: PIC-104-15.35-15.68; PIC-104-16.62-20.70; PIC-22-14.32-15.74; PIC-22-21.04-23.96~|~05 - 4R Maintenance - Resurfacing~|~6E2E41E278C1B9CF09FED523C8F931C6FA093AF3 105552~|~1~|~4~|~04/S<2~|~Circleville urban area plan split: PIC-22-15.74 to 15.98 and PIC-22- 18.88 to 21.04~|~05 - 4R Maintenance - Resurfacing~|~4AE7C276C609A25EB582AD2EADF0185BC3266DE0 114445~|~1~|~1~|~01/NFA~|~Resurfacing SR 520 from SLM 0.00 to SLM 12.51~|~05 - 4R Maintenance - Resurfacing~|~C17E1ABCD98700C1EA91366CE7EC9172780C8EA6 114445~|~1~|~2~|~02/STR~|~Resurfacing SR 520 from SLM 12.51 to SLM 13.47~|~05 - 4R Maintenance - Resurfacing~|~0B6A832D6A73A91BFA540AE8C33F8CE590C6A532 111355~|~1~|~1~|~01/NFP~|~ODNR project for facility resurfacing at the Forked Run State Park. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~F9A63D909C982667FCB2C35D73E82204C77280A9 91941~|~1~|~2~|~02/S<2~|~LAW 7 3.62-6.36PIK 104 10.40-12.01~|~44 - Other~|~84A13AF5D675DFD2C4D77F633C89DBF23B1D3596 91941~|~1~|~3~|~03/NFA~|~LAW 650 7.88-7.99SCI CR7~|~44 - Other~|~4712D4B910E21D50C6DEADDF5C569C7A732BFD2A 91941~|~1~|~1~|~01/STR~|~JAC 233 0.68-3.23JAC 327 11.84-20.50LAW 93 9.37-10.60LAW 522 6.98-7.47LAW 650 2.61-3.11/3.81-4.11LAW 775 7.14-7.38PIK 104 8.45-10.40SCI 125 1.71-6.27SCI 335 11.72-11.73SCI 522 2.90-3.00~|~44 - Other~|~73EE7FA9527ECFFF2A6F2A87EBFCF4A8BA04DEC8 102898~|~1~|~1~|~01/NHS~|~Resurface US 20 from 19.32 to 24.43.~|~05 - 4R Maintenance - Resurfacing~|~E2EBC28AA41246B2E9950EE22961398BC1918167 102898~|~1~|~2~|~02/NHS~|~SAN-29-22.53 Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~2DD7F0449E2514D678264074E0EF0A327D13FF53 117059~|~1~|~1~|~01/STR~|~Culver replacement project. MEG 681 11.99 (CFN 1814380) and MEG 681 12.25 (CFN 1814382).~|~~|~87C2D314C13F95315C759A172DB23B58D99909F6 88885~|~1~|~1~|~01/STR~|~Bridge (length <20') work: RIC-545-9.90 (SFN 7006675)~|~13 - Bridge Rehabilitation~|~AD1FE70443DFCAA19EC13A3476056D67B0F673B8 113615~|~1~|~1~|~01/NFP~|~Improve the intersection of Graham and Castalia by increasing the radii of the intersection, widen Graham to include a right turn lane and minor drainage improvements.~|~44 - Other~|~3A678FA3810EA596039A84F7144EF66573601675 109221~|~1~|~1~|~01/NFA~|~2018 Operations Chip Seals~|~05 - 4R Maintenance - Resurfacing~|~8A92DCB181DF38AE4143A0D7D14878A5C1D84E16 123075~|~1~|~1~|~01/ENH~|~reconstruction of Maple Street in City of Eaton~|~04 - Reconstruction - No Added Capacity~|~6AA2F18311C7CA968865264D5A014A1EF760D177 123075~|~2~|~2~|~02/ENH~|~Plan split for non-roadway, TA(P) eligible items. ~|~28 - Facilities for Pedestrians & Bicycles~|~A6C23C6EF3F6D66FC94D9D71AF085879D1001812 92526~|~1~|~1~|~01/S>2~|~Plan Split for Traffic Signal on SR 687 at SLM 4.78~|~21 - Safety~|~F1E5FB561F8B74B93CFC05143BAC194EEE9359A8 93797~|~1~|~1~|~01/SAF~|~SR335 Guardrail & Paved Gutter Safety Project On SR335, 0.05 mile south of Swauger Valley Road to RR overpass. it is proposed to upgrade and relocate guradrail on the east side of SR335 and at the intersection of Swauger Valley Road and install paved gutter on the west side of SR335. PE Phase is 90% Fed/10% State Safety FundsRW Phase is 90% Fed/10% State Safety FundsCO Phase is 100% Fed Safety Funds01/SAF/OTH/State~|~~|~325C75B6F88C2F31A272A2BD6085212633788598 105664~|~1~|~1~|~01/NHS~|~Work on the NHS. District Preservation Program funds.~|~05 - 4R Maintenance - Resurfacing~|~D445563739ACB5F051C065EB02C2DE2DAF1E20D8 98346~|~1~|~1~|~01/NFP~|~80% State / 20% Local participation split for eligible work items~|~05 - 4R Maintenance - Resurfacing~|~BBF59F15C0C1182EB532AE3AED31881B94A980BA 98346~|~1~|~2~|~02/NFP~|~100% Local participation for non-eligible work items.~|~05 - 4R Maintenance - Resurfacing~|~42786A0BE65BBA807ECF4C8E3D596FCFF46D991F 104793~|~1~|~1~|~01/NFP~|~Landscape maintenance at various locations~|~31 - Landscaping & Other Scenic Beautification~|~1562227BFFF1C318373546A5A28606AF78B0FDDC 98952~|~1~|~1~|~01/NHS~|~Tree cutting and pruning.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9FE8631D4B35881AB9F081E2C2DAF548EAEA51DA 126745~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~01 - New Construction~|~B403359EDCA18E0068F2C1E5B5CC95202D81365A 100991~|~1~|~1~|~01/NHS~|~Access management of various intersection on central ave in Toledo.~|~21 - Safety~|~1FB3690DDDDDA27030744C4ED9392429A5A61902 112456~|~1~|~1~|~01/NFP~|~Split for slide repair work~|~44 - Other~|~DB12120C8C1C2731FB1F7957B63EA4DEFD00772F 94178~|~1~|~1~|~01/IMS~|~Resurfacingwith minor pavement repair on I-75 to hold over until TRAC projects widen the roadway. Resurface all lanes of I-75 from US 27 to past the I-74 interchange: HAM IR 75: SLM 4.14 to 5.80~|~17 - Construction Engineering~|~F26D427DD36E006C31FC7B39DE4D20BCF67AD6CF 116879~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~443DB762943919C0B82183D38C9D7C6CA63AB01D 118965~|~1~|~1~|~01/S5K~|~Resurfacing SR 45 and SR 164 in Lisbon~|~05 - 4R Maintenance - Resurfacing~|~6383A782B67B1134BFAAD516A9CF92CE58D554FD 118965~|~1~|~2~|~02/NFA~|~Resurfacing SR 164 from SLM 15.60 to 15.72~|~05 - 4R Maintenance - Resurfacing~|~5AF044408AFEB451C631A04CE6968AB9224B573F 125992~|~1~|~1~|~01/NHS~|~Split~|~05 - 4R Maintenance - Resurfacing~|~1E1A7453EBFDD756425F8DD8ECB79E8508B2C649 94271~|~1~|~7~|~07/IMS/ColU~|~100% Columbus Public Utilities items:new 8" water line at Mound Stmore than 4 electric ducts at 70/18th/Mooberry~|~43 - Utilities~|~3BF0601412C6C9AEE476180A11A6CA8E01E2D340 94271~|~1~|~4~|~04/IMS~|~IM funding for project eligible utilities - water, sanitary, electric~|~43 - Utilities~|~5073EF7F04C5EBC8EE9D63591EA590762B2B7128 94271~|~1~|~6~|~06/IMS/ColS~|~100% Columbus Public Service funded items:electric line going underground on Grant Ave, brick crosswalks~|~31 - Landscaping & Other Scenic Beautification~|~AAB9AB97921AAFF737E1851E9563C0185B11E02C 94271~|~1~|~9~|~09/IMS/AEP~|~100% items funded by American Electric Power:16 5" conduits at 18th St bridge~|~43 - Utilities~|~B27BBDB3AB041A1982B0187B458985E130D3634E 94271~|~1~|~3~|~03/IMS~|~IM funding for bridge replacement (not BR eligible for replacement):SFN 2504839, FRA-70-15.25, 18th St~|~10 - Bridge Replacement~|~BA2049AE17A67CAA4657D5C7068C07B9CA161AB0 94271~|~1~|~8~|~08/IMS/CHos~|~100% items funded by Chilren's Hospital:8' extra width on 18th St bridge4 4" conduits with pullboxesdrainage & irrigation items on structure~|~31 - Landscaping & Other Scenic Beautification~|~C5ED4F03ABD63D1D8A364A3638711BFEA7B5729F 94271~|~1~|~1~|~01/IMS~|~IM funding for pavement, retaining walls, new P2 ramp, Mound St connector, closing ramps, debris removal~|~04 - Reconstruction - No Added Capacity~|~CA55C59EE0DB0E6724C0EE5AFEF87967C6CED1EC 94271~|~1~|~2~|~02/IMS~|~IM funding for new bridge constructionSFN 2518929, FRA-70-17.04, on P2 ramp over I-71 and Parsons Ave~|~08 - Bridge - New Construction~|~D989EC7B4C4F0BD88A2AC71FC9F8EFF3A827906E 94271~|~1~|~5~|~05/MPO~|~MORPC STP & Columbus Public Service funding for items on Mound St: 5' bike lane, trees & grates, sidewalk~|~28 - Facilities for Pedestrians & Bicycles~|~FE02B17CAC01759A03FF3A382FEEE53DD55FE567 119764~|~1~|~1~|~01/ENH/THRN~|~Construction of multi-use pathway~|~28 - Facilities for Pedestrians & Bicycles~|~EDFE68C37EFE2F4C830149CD37B45963F1D74651 102896~|~1~|~1~|~01/SAE~|~Pavement marking upgrade on various Medina County roads.~|~21 - Safety~|~AB4EC37E6184ECC6D6B36C59C24D13143F7F21E9 113663~|~1~|~1~|~01/SAF~|~Improvements to IR 270 SB off ramp and Easton Way (Station 80+74.30 to Station 64+65.00)~|~21 - Safety~|~F403F105EEA7497DE21DB38C7E1BC4E9C4E505D8 113663~|~1~|~2~|~02/S>2/COC~|~Items of work associated with resurfacing of Easton Way (Stelzer Rd to Station 64+65)~|~05 - 4R Maintenance - Resurfacing~|~4E8D706CDD4545821BA7838CAEF47691449D259F 114718~|~1~|~1~|~01/NFP~|~Districtwide guardrail repair and upgrades.~|~21 - Safety~|~901ABDF1F3B634176604847DD3959F51F8DF5116 100444~|~1~|~1~|~01/NHS~|~Deck SealingROS 023R 8670 L 7100337ROS 023R 8670 R 7100361ROS 023R 9260 L 7100396ROS 023R 9260 R 7100426ROS 023R 10000 L 7100450ROS 023R 10000 R 7100485ROS 023R 10260 L 7100515ROS 023R 10260 R 7100574ROS 023R 10520 L 7100604ROS 023R 10520 R 7100639ROS 023R 10740 R 7100663ROS 023R 12020 L 7100698ROS 023R 12020 R 7100728ROS 023R 12570 L 7100752ROS 023R 12570 R 7100787ROS 035R 3420 L 7101465ROS 035R 3420 R 7101481ROS 035R 3640 L 7101538ROS 035R 3640 R 7101562~|~13 - Bridge Rehabilitation~|~8FA8E5C0EF903FCAB93296771438A3A9A161B129 125778~|~1~|~1~|~01/STR~|~CLI 350 10.11 replacement~|~04 - Reconstruction - No Added Capacity~|~D238466EEDDF50E673BC6E2BDED2A064679D0CAD 98688~|~1~|~1~|~01/S>2~|~This Plan split covers all roadway work included in the project. RBX/Erie/Brotherton Intersection~|~04 - Reconstruction - No Added Capacity~|~095986C53F16FA8F7717A5A1E10761F56A3DB91A 100845~|~1~|~1~|~01/S<2~|~Slide repairs~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~51880CB44B9174175517BCC49854B50959B589D5 115603~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~8862F851252EA3D95F3BFD08F73A74360EC2BD8A 121701~|~1~|~1~|~01/NHS~|~Culvert Repair. GAL 7 2.48 (CFN 2700158).~|~04 - Reconstruction - No Added Capacity~|~94C98DC44F208637A61005D1863B67F05A458B6F 120475~|~1~|~1~|~01/S5K/LANC~|~Replacement of structure carrying E. Sixth Ave over Fetters Run (SFN 2360713).~|~10 - Bridge Replacement~|~2A1A2C4B6222EE87267FC569A8BAA91D230E0565 119972~|~1~|~1~|~01/BRF~|~Plan split for bridge demolition & turn around work.~|~40 - Special Bridge~|~AD3306E5BDABAA0E53FFFE9751BE3D9C9BF4E222 109672~|~1~|~1~|~01/SAE~|~100% CEAO Safety funded~|~21 - Safety~|~5FD261FED56F7A868AE188F5604D0D08BCA18362 125804~|~1~|~1~|~01/STR~|~NOB SR 215-0.00~|~05 - 4R Maintenance - Resurfacing~|~1AC85A842C7B71C795A000D38F9B62DE50D1BC21 94433~|~1~|~1~|~01/STR~|~Bridge - Major Rehabilitation~|~13 - Bridge Rehabilitation~|~FEE8A27D6F5B46AF55FE283B57385DC837EC89FE 114656~|~1~|~1~|~01/NHS~|~Plan split for the NHS locations on GRE-42 and GRE-444~|~04 - Reconstruction - No Added Capacity~|~0305F7E78523CC820F302B9802D692FE8CB86C92 114656~|~1~|~2~|~02/STR~|~Project to Pave inverts of bridge size culverts and perform other related repairs Including GRE-68 and GRE-343~|~13 - Bridge Rehabilitation~|~7A8094E37DDC289F870666642B55BAA88610047C 114656~|~1~|~3~|~03/STR~|~plan split for the bridges less than 20 ft long on CLI-380~|~04 - Reconstruction - No Added Capacity~|~C0B76D44CC021C067E1A77BB3FC06941179978B2 77555~|~1~|~2~|~02/NHS~|~Construction of new structures~|~08 - Bridge - New Construction~|~F26ACBD81F59A9D9F87BADAB9E98F69D0D0AD6FE 77555~|~1~|~3~|~03/NHS~|~Rehabilitation of SFN 2300486 (FAI-33-2.92)~|~13 - Bridge Rehabilitation~|~6FED055B9D0A61B6769219B363ED4E7DB6516DD3 77555~|~1~|~1~|~01/NHS~|~Construction of an interchange on US 33. Closure of access points at Allen Road/US 33 intersections.~|~01 - New Construction~|~539DD62A785E10D08F43515739B8AA576BEE0538 77555~|~1~|~4~|~04/STR~|~Roadway work along Pickerington Road (outside of ramp termini) and Benadum Road.~|~04 - Reconstruction - No Added Capacity~|~FD0A1489FE20D579CECEE07E1D0490C120E4684B 118703~|~1~|~1~|~01/STR~|~Superstructure replacement.~|~~|~932D1E6B18A9BD1106954383E120475F4A00A052 125333~|~1~|~1~|~01/NFP~|~Created For J&C Involvement~|~44 - Other~|~50C6EA3556545C83A5A8A7BB6C31EACAAC74A322 117710~|~1~|~1~|~01/BRO~|~Plan split for 80/20 Fed / State split for all work on project~|~10 - Bridge Replacement~|~2738E2E4BE5FF29FA61E1A54C367E40CE51A9D2D 82119~|~1~|~6~|~06/NFA~|~Work not eligible for Federal Funding. Includes bridge removal. SFN 1819984~|~08 - Bridge - New Construction~|~0020A5A42373546EF45278E4E88759420749D4C1 82119~|~1~|~5~|~05/NHS~|~Interstate pavement work for capacity addition @ 80/20~|~08 - Bridge - New Construction~|~4B478AF7C3319FB70F4F2AC223106897CB9ADA46 82119~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds. Demolition of existing Innerbelt Bridge Truss, SFN 1809393.~|~15 - Preliminary Engineering~|~8323D6ACC5CFBBD13C1D7264B4C06BDABB1559C5 82119~|~1~|~2~|~02/IMS~|~Interstate bridge work on existing system @ 90/10. SFNs 1808788, 1809431, 1805584, 1807625, 1807684, 1808753, 1808931, 1808818, 1808842, 1807498, 1807714, 1808893, 1807773, 1812432, 1812386, 1806904~|~08 - Bridge - New Construction~|~BD01C7863F9BCD120FB802D60412D619DD335C53 82119~|~1~|~8~|~08/IMS~|~100% state funded split for interest payments.~|~~|~BEE4E03BE568BA36184F31028937D2923ADF1EC5 82119~|~1~|~3~|~03/NHS~|~Interstate bridge work for capacity addition @ 80/20. SFNs 1808788, 1809431, 1805584, 1807625, 1807684, 1808753, 1808931, 1808818, 1808842, 1807498, 1807714, 1808893, 1807773, 1812432, 1812386, 1806904~|~08 - Bridge - New Construction~|~C2884FB06B807C19E413182031D6ACD7124374CB 82119~|~1~|~4~|~04/IMS~|~Interstate pavement split for work on the existing system @ 90/10~|~08 - Bridge - New Construction~|~DF591E969E9427B6A87B5C541E39CDD256768149 82119~|~1~|~7~|~07/ENH~|~Project Work Eligible for Transportation Alternatives Funding, including Towpath Trail and Ontario Shared use path, @ 80% federal.~|~08 - Bridge - New Construction~|~E8EE202351EC1BE12F2D11460164D154A13EA993 105284~|~1~|~2~|~02/STR~|~Plan Split for the rural section of CLE-28~|~05 - 4R Maintenance - Resurfacing~|~F98293F7B6DE48573D5F01BB2959A60934992E39 105284~|~1~|~1~|~01/S>2~|~Plan Split for work in the Large Urban Sections of the project.~|~05 - 4R Maintenance - Resurfacing~|~905970BBDF5DF1E98316A8D8715913F253507C6E 101445~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% (Vermilion) Urbanized Area Inside Corp. Limit (Paving Items):ERI 0006 27.80 to 29.54~|~05 - 4R Maintenance - Resurfacing~|~1C2371D4D692C8DA82958261D0217ED90856C936 101445~|~1~|~2~|~02/NHS~|~100% Local (Vermilion): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps, Curb, Curb Remove, Guardrail Items etc.): ERI 0006 27.80 to 29.54~|~05 - 4R Maintenance - Resurfacing~|~70DAF4F8424F0AEA0E8FC933654CC9C19DF4D8FE 101445~|~1~|~5~|~05/S<2~|~100% Local (Vermilion): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps, Curb, Curb Remove, Guardrail Items etc.): ERI 0060 08.98 to 09.86.~|~05 - 4R Maintenance - Resurfacing~|~949F9F6685D18ED5B7D853B66A01132D02293457 101445~|~1~|~4~|~04/S<2~|~Federal 80%/Local 20% (Vermilion) Urbanized Area Inside Corp. Limit (Paving Items): ERI 0060 08.98 to 09.86~|~05 - 4R Maintenance - Resurfacing~|~59C0B07A2DE358868D3E32E9526BF083B608E1F0 101445~|~1~|~3~|~03/NHS~|~Structure ERI-6-28.93 Repair Expansion Joints.~|~13 - Bridge Rehabilitation~|~6377F3F85E218E16E27F84E30D4FE0B7F0A6D9E3 98537~|~1~|~1~|~01/SAE~|~District Wide project for various striping and RPM work. Actual work locations to be determined~|~21 - Safety~|~4C1B98CE9ED7DCE4D3CF0E03F894B70BA8086D45 108720~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-030~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D29A5057E771D9CAF6E55AAC31BA77A0AD2BD260 94393~|~1~|~1~|~01/S<2~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5A9931607C9FEF07E7106A1EA44FEE5B3E9AF193 94393~|~1~|~2~|~02/STR~|~General System Resurfaing~|~05 - 4R Maintenance - Resurfacing~|~FD6CBE01ED7ABF54871755840298E57F1287DC9C 94393~|~1~|~3~|~03/SAF~|~Bike Lane on widened Shoulder SLM 07.52 TO 08.57.~|~21 - Safety~|~DFE77E8886C558B87BE2FD7C32FC70E17C729D0D 94393~|~1~|~4~|~04/SAF~|~Funding for center Line rumble stripes Outside of Berlin.~|~21 - Safety~|~FF092319B6C5045ED70169FBFAF561CF786D5FE8 105396~|~1~|~1~|~01/SAF~|~Restriping various County Routes.~|~21 - Safety~|~50E6F5909F85FA38AEA72F729E29A67AD5DEF17F 127108~|~1~|~1~|~01/IMS~|~Plan split for partial deck replacement (Ramp C-D) of a federally eligible bridge~|~13 - Bridge Rehabilitation~|~320663EBF3253C13A95BCF14A9E0C6A20C3D40DE 103696~|~1~|~1~|~01/SAF~|~All work in this project. Funding from the Safe Routes to School Program. 80% SAC 4SC7 and 20% Toll Revenue Credit to being the funding to 100% federal. Funds needed over the cap are the responsibility of the Village of McComb.~|~28 - Facilities for Pedestrians & Bicycles~|~940190A1F3E84AD9EE3EE36901633BCD486E6CEE 99481~|~1~|~1~|~01/NFA~|~Village is constructing 1410 linear feet of roadway and storm drainage.~|~~|~53F13A4DF9A6DEADB181E1868FABC915762E1C74 125612~|~1~|~1~|~01/S50~|~Resurfacing SR 43~|~05 - 4R Maintenance - Resurfacing~|~DADC2FAC7059FB7511D11EE66B5AB137E1A5E6B0 87452~|~1~|~1~|~01/ERD~|~Ferry Boat Discretionary Funds~|~26 - Ferry Boats~|~2D5BD643DD0C5B0F9642FEBDC0EF4A52AEA5E69C 112554~|~1~|~3~|~03/STR~|~Plan split for the bridge work on 3 bridges: BUT-122-0745, BUT-122-0297, and BUT-122-0310~|~13 - Bridge Rehabilitation~|~428ABF996B902C7292FADA25D8B0A1098634088E 104932~|~1~|~1~|~01/MPO~|~Work eligible for streetscape funding.~|~28 - Facilities for Pedestrians & Bicycles~|~46AEB0702CEE3BB38859002FDDF8059349063855 104932~|~1~|~2~|~02/NFP~|~Clark Avenue pavement rehabilitation using 100% local participation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~340C17B579B0578EBA4074BA0EC3386544DA76C2 102062~|~1~|~1~|~01/SAF~|~This plan split is for the curve locations within the City of Cincinnati.~|~21 - Safety~|~44008EECF620A70030AAC881E4CD0F8C729D34F7 107568~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project for FY 24~|~21 - Safety~|~F0B7E9DCFEBB7A96CD7FD16BC72862465D604A65 101255~|~1~|~1~|~01/SAF~|~Upgrade signals, signage and pavement markings, install sidewalks and provide bicycle parking, curb ramps on affected intersections in vicinity of school.~|~21 - Safety~|~BFC9BC230E27D787691FDFEF15A654F1537068AE 108964~|~1~|~1~|~01/S>2~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 80% ODOT and 20% City items on the Urban portion of US 127.~|~~|~D8D0297BF602B645142BB5F07D96F21015159EFD 108964~|~1~|~2~|~02/S>2/MTH~|~FY2022 Urban Paving in the City of Mt. Healthy on US 127. This plan split is the 100% City items on the urban portion of US 127.~|~~|~54C7465180513560A371EE15BF7E385E5DF070B6 125222~|~1~|~1~|~01/NFP~|~Guardrail maintenance project on various routes in Franklin County~|~21 - Safety~|~56D31081DFC015BB9F3CF16174F33BE0D8075124 94256~|~1~|~1~|~01/IMS~|~plan split for roadway work in the project:HAM-275: SLM 28.69-35.07~|~05 - 4R Maintenance - Resurfacing~|~1BD7EAFBF6DCFEA09D21131A48E6A09470BECA1B 94256~|~1~|~2~|~02/IMS~|~Plan Split for widening the westbound median shoulder to be utilized as a SmartLane in peak times~|~03 - Reconstruction - Added Capacity~|~64E7D4635536D0BED22067DED317DF1318B0A43F 94256~|~1~|~3~|~03/IMS~|~TSMO funded work for ITS devices~|~21 - Safety~|~9103F55E778751DED7104FA3ECAD32F3F1D496A0 94256~|~1~|~4~|~04/NFA~|~retroactive fuel price adjustment~|~21 - Safety~|~7938FE3953B2A20C0B5688EEC48F640D1EFE3497 101773~|~1~|~1~|~01/MPO/SEBR~|~Resurfacing of 12th Street in the Village of Sebring (SLM 0.37 to 2.18).~|~05 - 4R Maintenance - Resurfacing~|~2CFBCE63660B5DB9599E48B24976710C5F2C25A3 101773~|~1~|~2~|~02/S<2/MAHC~|~Resurfacing of 12th Street adjacent to the Village of Sebring, work paid by the Mahoning County Engineer (SLM 0.00 to 0.37 and 2.18 to 2.23).~|~05 - 4R Maintenance - Resurfacing~|~0567ECD953102E377BF0322ECD7C043801220115 101773~|~1~|~3~|~03/STR/MAHC~|~Resurfacing of 12th Street adjacent to the Village of Sebring, work paid by the Mahoning County Engineer (SLM 2.23 to 2.49).~|~05 - 4R Maintenance - Resurfacing~|~A96F25967E2D66F0A1E394E7ABA9520F8CE166B4 99418~|~1~|~1~|~01/MPO~|~Improve and increase the accessibility for cyclists, by adding bike racks throughout the city.~|~28 - Facilities for Pedestrians & Bicycles~|~AF6483710EC88DB0D063BE4C40216C0125EBB149 126970~|~1~|~1~|~01/IMS~|~Replace bridge decks~|~13 - Bridge Rehabilitation~|~1CC42C6760C5A8317FE8B639BC767FAB1FDC7AB7 101476~|~1~|~1~|~01/MPO~|~Reconstruction of small portions of the Regional Bike Trails as a result of utility cuts, root heave and sub-surface conditions. The project will also include a complete micro-surface of the trails to extend the life of the trails making the most of the original investment to significantly extend the life of the trails.~|~28 - Facilities for Pedestrians & Bicycles~|~67658FF101B938B29BDA448E08C01A50C08957A4 116540~|~1~|~1~|~01/MPO/MACE~|~Resurfacing of Valley View Rd from Hudson Corp Limit to Twinsburg Rd, in the City of Macedonia, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~04F4EEFC71C847A2A280972C54A6F1AE3A129FE9 92911~|~1~|~1~|~01/S<2~|~Bridge removal project. WAS-618-0098, SFN 8404747. Urban other federal aid funded 80 federal/20 state.~|~44 - Other~|~28934669B111723C3F500F411FB9A963C574F7A6 92911~|~1~|~2~|~02/STR~|~Landslide repair on the WAS 618 0.67 section. DSR WAS-004, 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5697DE6504EB0969AE6E4D4E23B33EC5C8031D65 89695~|~1~|~3~|~03/S>2~|~Split for items funded at 100% local cost~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1E271DD4ACDA5EFF64096E16AF2C57DCF8077F01 89695~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all work on this project using MPO Enhancement funds.~|~31 - Landscaping & Other Scenic Beautification~|~68A1E2FCFC4829AFB70ED135D6D9BD56B7F7A4FA 89695~|~1~|~2~|~02/MPO~|~80/20 funding split to rehabilitate Larchmere Blvd from MLK Blvd to North Moreland Blvd.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6EA2815938D77B46D5C3CF8F1791848538A58BDF 116730~|~1~|~1~|~01/STR~|~Plan split for Rural roadway segments~|~05 - 4R Maintenance - Resurfacing~|~8D412E24A6BBF584556FEB119E2F127D6CF1D236 116730~|~2~|~2~|~02/S5K~|~Plan split for roadway segments STP 5,000-49,999~|~17 - Construction Engineering~|~122AB4F5C175946756A101D7927B08D2D3E817F6 119490~|~1~|~1~|~01/NFP~|~Repair of superstructure and guardrail~|~13 - Bridge Rehabilitation~|~6F74ED94F6A18D89C5DB8D8D2421321AD5456255 117674~|~1~|~1~|~01/BRF~|~Primary plan split for CEAO LBR funds.~|~10 - Bridge Replacement~|~819C740210F2E0D9008DA3B37321655E553559C6 93541~|~1~|~1~|~01/SAE~|~Project Locations: Kyles station between Aspen Valley & Lesourdsville West Chester. Aspenwood Dr. Aspen Trails Blvd. Woodmansee Way. Sugar Valley Pl. & Poets Way. Sugar Valley Pl. Cherokee Elem. School. Kyles Station Road & Lesourdsville West Chester Roads. Walton Creek between existing walk and Hamilton Mason Road. Walton Creek between Hamilton Mason to Barkwood Dr.~|~21 - Safety~|~4DBCE1EB289C366F7B353B4D7F3A989E79380C6D 96247~|~1~|~2~|~02/STR~|~STP Rural. SLM 2.94-10.17; 4903609 MAD-142-0322 over Deer Creek; 4903633 MAD-142-0566 over Glade Run; 4903668 MAD-14-0597 over Sidner Ditch~|~05 - 4R Maintenance - Resurfacing~|~7DE336D9A9A7EF2FF23F8B1E2D8F5567F09B378B 96247~|~1~|~1~|~01/S<2~|~STP UP. SLM 0.19-2.94 London~|~05 - 4R Maintenance - Resurfacing~|~FC4AEB05DD9763899669CCDE29B16232BAEE42D1 108833~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. WAR-CR 196-1.01 (SFN: 8333556) which carries Edwardsville Road over Lick Run.~|~13 - Bridge Rehabilitation~|~7DEB7D2495E1CE46952F2BC08BBE674C9DE3FADB 114413~|~1~|~1~|~01/NFP~|~Plan split for all sign replacements on project~|~21 - Safety~|~7F045AC510D0170C8A413EA24C855CCC4D88C0F2 126183~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~48E42F7605FE8DCA2D3BAFB8951594ECF3D24840 119241~|~1~|~1~|~01/S5K~|~Marion Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~BACD2E0F5CB7B8F2330A6C3CCEF1B04601E894F0 119241~|~1~|~2~|~02/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~AAE2433CF7167FC44671F5DFBE5A7F6A6A386D01 109362~|~1~|~1~|~01/SAF~|~Safety program funded work to remove five at grade intersections and convert two to partial J-Turns on US 23. Funding is 90% federal safety program funds SAC 4HJ7 and 10% state safety program funds until the safety program cap is reached. Funds over the cap will cone from the District Preservation program budget.~|~17 - Construction Engineering~|~7A73AC01C4BDE6B0991A3E64FB5638C0512E41E7 76469~|~1~|~2~|~02/NHS~|~Work to add one extra lane in each direction~|~03 - Reconstruction - Added Capacity~|~9EB993D3911BF5221FA03E60B1D13ACB1FD7B6D9 76469~|~1~|~1~|~01/IMS~|~Pavement rehab and shoulder widening of FRA-270: 9.15 - 15.96, Trabue to US-33~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2604E9CF377238AF8E484224EDBFCBC28DE6D42F 76469~|~1~|~4~|~04/NHS~|~Bridge widening work on 6 structures:2509571 FRA IR270 10.03 Intersect: Raymond Run2509601 FRA IR270 10.03 Intersect: Raymond Run2510081 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510111 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510200 FRA IR270 16.19 Intersect: Cramer Ditch2510235 FRA IR270 16.19 Intersect: Cramer Ditch~|~13 - Bridge Rehabilitation~|~EA04E4254783A3A472A8066B0EBCB8AE5772C90D 76469~|~1~|~5~|~05/NHS~|~Power charges from AEP~|~04 - Reconstruction - No Added Capacity~|~E419FDF7C07CFF0821FADCE5BB07179488636187 76469~|~1~|~6~|~06/IMS~|~Costs to repair damage due to vehicle accidents~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D8F77E9E5F41498AAD14B01D72E278CE7EEA3126 76469~|~1~|~3~|~03/IMS~|~Bridge work on 10 structures (OL, seal, patching):2509571 FRA IR270 10.03 Intersect: Raymond Run2509601 FRA IR270 10.03 Intersect: Raymond Run2509725 FRA CR29 11.03 Intersect: Scioto Darby Cr.Rd & NS RR2509784 FRA CR29 11.03 Intersect: Scioto Darby Cr.Rd & NS RR2509873 FRA IR270 11.8 Intersect: over CSX RR2509903 FRA IR270 11.8 Intersect: over CSX RR2510081 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510111 FRA IR270 14.74 Intersect: Over Hayden Run/Hayden Rd2510200 FRA IR270 16.19 Intersect: Cramer Ditch2510235 FRA IR270 16.19 Intersect: Cramer Ditch~|~13 - Bridge Rehabilitation~|~B49CF7B2BB63468949B19DE6561929207FED7112 117445~|~1~|~1~|~01/SAF~|~Primary Plan Split for SRTS eligible scope items~|~21 - Safety~|~742100A4D1D844E92647CD76A87442DC7E469683 112474~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " Plan Split 1~|~21 - Safety~|~1439C1BBC7A105A59885B7F01DCD370A5A4E1AFF 88908~|~1~|~1~|~01/STR~|~Bridge Superstructure replacements to SFN 7601948 STA-62-4.55 and SFN 7601965 STA-62-4.60, Minor bridge work to SFN 7601999 STA-62-4.68 all 3 structures over Branch of Sugar Creek.~|~13 - Bridge Rehabilitation~|~641D7A425F1AA40A3CC3B7A3B7A84A4C34D9DDDF 110304~|~1~|~1~|~01/IMS~|~Demolition of buildings on two parcels. Only buildings in this contract shall be demolished in their entirety and debris/materials disposed of off-site. These building removals are required as part of the HAM-75-7.89 (PID 77889) project.~|~44 - Other~|~68106176E380E153553F7D041F3F5A6788BD80E0 25596~|~1~|~1~|~01/IMS~|~Resurfacing on MAD-71 SLM 4.56-11.68 & PIC-71 SLM 0.00-3.1601/IMS/PV/~|~05 - 4R Maintenance - Resurfacing~|~CD92C432BB86E64E062D63EF38020D7B49DAA033 25596~|~1~|~2~|~02/IMS~|~Minor bridge work - repairs and deck overlay4903153 MAD IR71 4.54 Intersect: Mud Run4903188 MAD IR71 4.54 Intersect: Mud Run4903277 MAD IR71 6.31 Intersect: Over Tr-66 (Dyer Rd.)4903307 MAD IR71 6.31 Intersect: Over Tr-66 (Dyer Rd.)~|~13 - Bridge Rehabilitation~|~359BFBDE3734C443B6FE518900BAFD6F83326302 25596~|~1~|~3~|~03/IMS~|~Repairs and deck replacement on MAD-71-0688 L/R~|~13 - Bridge Rehabilitation~|~20635C0C44BE4FE33AC03354B1A6CD2983EB6E03 25596~|~1~|~4~|~04/IMS~|~Add wet reflective pavement markings~|~05 - 4R Maintenance - Resurfacing~|~EF11F7D20C4C9B8DA8183DC3DADC465BB1BEA046 25596~|~1~|~5~|~05/IMS~|~Cost to repair damage caused by vehicle accidents~|~05 - 4R Maintenance - Resurfacing~|~D96B3F64A36EF428DCB194CB832BBC1D6E48BAC6 118945~|~1~|~1~|~01/IMS~|~Lime City Bridge over I-75 NB~|~13 - Bridge Rehabilitation~|~BDF02E07F2DC6C03BA8E1DA88A9163D3B707984B 116839~|~1~|~1~|~01/S>2~|~Resurface Market St.~|~05 - 4R Maintenance - Resurfacing~|~78D57653E2660C269C1C19D422A0D6A7AD279BEA 98713~|~1~|~1~|~01/NFP~|~Bridge over turnpike.~|~21 - Safety~|~A932D49CC99E77C0286D8C23043881650D43C76D 93267~|~1~|~1~|~01/BRO~|~- District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3001059 GUE IR70 6.55 Intersect: CR 15 #; BR Eligible for Rehabilitation: Length=114 SD/FO(1) SR=62.3 DSR=7~|~13 - Bridge Rehabilitation~|~ADE6A59B0F572451DC119666C3DA9E89079DAC2A 100469~|~1~|~1~|~01/NFA~|~This is for all the resurfacing work on TUS-751 from 0.00 to 3.99~|~05 - 4R Maintenance - Resurfacing~|~A28A01E17BF2262D3E08B2D7ADBDCB11629A773F 100469~|~1~|~2~|~02/STR~|~Resurfacing of TUS-751 from the 3.99 to the 4.20~|~05 - 4R Maintenance - Resurfacing~|~8884EACD386D1AFFA8306C7BA553A02853D97B77 114904~|~1~|~1~|~01/NHS~|~NHS plan split~|~05 - 4R Maintenance - Resurfacing~|~AB79F62A56010443A614722B992E8B5FB3B3EE4A 114255~|~1~|~1~|~01/S<2~|~Widening of N. Maple Street from Mechanic to Lexington to provide on-street parking. Reconstruction of pavement, addition of curb and gutter, and storm sewer.~|~21 - Safety~|~09B66FC892E46E06BCBC0FF339A4ED987A21CB42 114255~|~1~|~2~|~02/SAF~|~Replacement of existing deteriorated sidewalks and construction of new sidewalk on both sides of N. Maple Street, from Mechanic to Lexington.~|~28 - Facilities for Pedestrians & Bicycles~|~51F61297E3E816CA7046A54EE8465020065572F0 101231~|~1~|~1~|~01/NFA~|~DEF Village of Hicksville A&P Tool~|~01 - New Construction~|~E524C8A9792CB9B885439F34FC16226522A699E4 93147~|~1~|~2~|~02/S>2~|~Paving outside Delaware Corp. SLM 9.51 to 9.69~|~05 - 4R Maintenance - Resurfacing~|~BADD400894D72D75AEC591ACEFCE789195E0C813 93147~|~1~|~1~|~01/S>2~|~Delaware urban paving of US-42, 8.78-9.51~|~05 - 4R Maintenance - Resurfacing~|~C10007CA114A616FB2758CE472D400370A195A23 93147~|~1~|~3~|~03/S>2~|~100% City items (ie pavement repair)~|~05 - 4R Maintenance - Resurfacing~|~81D67677EF3236F27BF5B58096400B0D104A12B5 122328~|~1~|~1~|~01/NFP~|~Plan split for highway maintenance mowing contract throughout the district~|~99 - State Preventative Maintenance~|~28BE507167B4C13E93A457040D4355F9CA3D38F1 101921~|~1~|~1~|~01/NHS~|~Emergency resurfacing project. GAL US 35 16.81-17.64 WB and 17.28-17.56 EB. 100% State funds.~|~05 - 4R Maintenance - Resurfacing~|~A2EF736C80B8805628AD2D174F7BE3113A903578 88741~|~1~|~1~|~01/IMS~|~Districtwide Raised Pavement Marker program.~|~21 - Safety~|~E0EC9DA0E8C17E12984CD2EB61E58534E5E06CDA 113597~|~1~|~1~|~01/NHS~|~Split for eligible paving work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~18BA72C90CCBAFF51739C876C81FBE2BF9B30AC8 113597~|~1~|~2~|~02/NFA~|~Split for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~5AB49AE2D2D23C803F98A44AD7FC5FDA00697563 110095~|~1~|~1~|~01/IMS~|~FRA-270-48.47 to 52.16~|~05 - 4R Maintenance - Resurfacing~|~49547FD494DC1AD1F53BA5F7D17274453351EE73 105341~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~15F8930E545012535CBF2E834EEB0005891E6EFE 105341~|~1~|~1~|~01/IMS~|~Smooth seal~|~05 - 4R Maintenance - Resurfacing~|~727CE3AD83D48230AF557905D305427B4744BD76 105341~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~A3E0DEA5D522076901ACA679DA3643CC54027EA7 118428~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction contract work items~|~10 - Bridge Replacement~|~01145E8C400521A7BB3B51502B1C2A2E12332360 118428~|~1~|~2~|~02/STR~|~Plan split for construction inspection items~|~~|~2210737E99258ED9C4A22F07A91E810E9921A0FA 118428~|~1~|~3~|~03/STR~|~Plan split for Detailed Design portion of Design Build Team's costs~|~15 - Preliminary Engineering~|~6FCE83CD502A1DFD02D29D4E5309782934984BB4 106277~|~1~|~1~|~01/STR~|~Landslide repairs from 2017 flood event. MOE CR44 0.60-0.80, DSR MOE-002. Funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E3B529168AD85B943C425037DEDCA8AA071A7B61 103813~|~1~|~1~|~01/IMS~|~Culvert repair on Interstate route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FC7433BF75F7AFCCF2770BA20D64A1E8EF46386E 102369~|~1~|~1~|~01/NFP~|~Construct new parking lot on property owned by the Ashtabula County Metroparks.~|~44 - Other~|~9A37ECA2BB19D8674D6547BFD6C4CE0BCB17F30B 124758~|~1~|~1~|~01/STR~|~Resurfacing project in Meigs County. CR 1 (12.786-15.490), CR 28 (9.612-10.522), CR 33A (0-3.403), CR 5 (0.000-1.662), CR 3 (7.408-13.564), CR 124 (0.488-0.836).~|~05 - 4R Maintenance - Resurfacing~|~1C0AAB06C0465340A69FDA20B4C13256044D9033 124758~|~1~|~2~|~02/S5K~|~Resurfacing project in Meigs County, CR 5 (1.662-2.253).~|~05 - 4R Maintenance - Resurfacing~|~D29A50F4F04177651F0C98794B7392A02F9660CB 121895~|~1~|~1~|~01/BRF~|~Bridge Replacement on CR 4 over Opossum Run~|~10 - Bridge Replacement~|~7B90AF88AF48CD66B781F5376C6B6C2E8BF6AAFF 99996~|~1~|~1~|~01/IMS~|~Split for work on interstate bridges~|~47 - Bridge Preventive Maintenance~|~53E6BD830F3A33181CB6E3938A488350AC820C05 99996~|~1~|~2~|~02/NHS~|~Split for NHS bridge work~|~47 - Bridge Preventive Maintenance~|~98951FADD57ED6398A00EFEA9327DDD4F696758D 114885~|~1~|~1~|~01/NHS~|~HEN-6~|~05 - 4R Maintenance - Resurfacing~|~4821EBD0440F191AD02C4C1327220A6E773B0946 113122~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4D99FD4B8C47320448AD819A5085BC71120847F6 113122~|~1~|~2~|~02/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B27FC2F800E363D3D6A4A27709FC876090673DA8 113122~|~1~|~4~|~04/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~91796D18AC7068E617F00DF95A2A4736DF735AA0 113122~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~94F1E301DEE42D0C5CA94731E41E65E0F0652091 113122~|~1~|~5~|~05/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~A4C65A0F8B864D91CB0840AFDE5E7F8933545C5A 113122~|~1~|~6~|~06/STR~|~Minor bridge work 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~5572FB72EAC5B29A647ED71D937FBDCB34338649 100766~|~1~|~6~|~06/NFA~|~Districtwide fast dry pavement marking contract on routes that are not on the Federal-Aid SystemSFAYSR00729**C 6.61 to 14.82SFAYSR00734**C 6.61 to 12.56SFAYSR00753**C 0.15 to 10.49SMADSR00187**C 0 to 4.83SMADSR00729**C 0 to 1.75SMARSR00100**C 0 to 2.89SMARSR00746**C 0 to 9.92SMRWSR00746**C 0 to 3.08~|~21 - Safety~|~93C95390D420CBE324193EE2C2519259F9AEC63F 100766~|~1~|~5~|~05/STR~|~Districtwide fast dry pavement marking contract on non-NHS routes outside urban areasDEL-SR203-0.00 to 9.10 DEL-SR4-1.93 to 1.98 DEL-SR47-0.00 to 1.07 DEL-CR61-2.72 to 4.67 DEL-CR61-4.96 to 7.84 DEL-SR 229-0.00 to 8.56~|~21 - Safety~|~29A8B8FB5766AEB4F1BBF49ABFDF087EFD32E703 100766~|~1~|~1~|~01/IMS~|~Districtwide fast dry pavement marking contract on Interstate routes.SDELIR00071**C 0.89 to 17.23SFAYIR00071**C 0 to 14.66SFRAIR00070**C 0 to 3.42SFRAIR00070**C 7.94 to 14.3SFRAIR00070**C 15.3 to 24.93SFRAIR00071**C 14.54 to 15.26SFRAIR00071**C 16.83 to 17.19SFRAIR00071**C 17.9 to 25.62SFRAIR00270**C 0 to 9.3SFRAIR00270**C 26.49 to 30.61SFRAIR00270**C 32.11 to 32.5SFRAIR00270**C 35.37 to 54.97SFRAIR00670**C 0 to 3.88SFRAIR00670**C 10.23 to 10.39SMADIR00070**C 0 to 8.62SMADIR00071**C 0 to 4.56SMRWIR00071**C 0 to 12.19~|~21 - Safety~|~5CA048C168E2E467A38F1FEB0DAC721E76D3B5C2 100766~|~1~|~2~|~02/NHS~|~Districtwide Fast Dry pavement markings on the NHS systemSDELSR00037**C 23.08 to 29.08SDELUS00023**C 0 to 7.29SDELUS00023**C 7.41 to 9.34SDELUS00023**C 13.08 to 13.35SDELUS00023**C 14.37 to 14.4SDELUS00023**C 14.79 to 20.07SDELUS00036**C 12.83 to 14.84SDELUS00036**C 17.09 to 18.5SDELUS00042**C 0 to 1.41SDELUS00042**C 2.29 to 4.27SDELUS00042**C 6.27 to 6.45SFAYUS00035**C 0 to 4.52SFAYUS00035**C 7.51 to 11.97SFAYUS00035**C 17.45 to 24.02SFRASR00315**C 8.62 to 12.45SFRASR00665**C 9.9 to 11.61SFRASR00665**C 11.89 to 12.24SFRASR00665**C 13.48 to 14.52SFRAUS00023**C 0 to 0.51SFRAUS00023**C 1.5 to 2.2SFRAUS00023**C 4.58 to 5.41SFRAUS00033**C 26.61 to 29.09SFRAUS00040**C 4.76 to 7.53SFRAUS00062**C 22.26 to 22.6SFRAUS00062**C 31.65 to 33.7SMADUS00042**C 12.81 to 25.15SMARSR00309**C 19.38 to 20.24SMARSR00309**C 20.79 to 22.65SMARUS00023**C 0 to 2.44SMARUS00023**C 7.61 to 9.74SPICSR00762**C 11.18 to 14.89SPICUS00023**C 0 to 23.16SUNISR00004**C 0 to 2.57SUNIUS00033**C 8.72 to 25.11SUNIUS00036**C 0 to 6.94SUNIUS00036**C 7.68 to 9.63SUNIUS00042**C 0 to 9.89~|~21 - Safety~|~3B3F471DC238BB5D2C848E86FE6396E076998EC8 100766~|~1~|~3~|~03/S<2~|~Districtwide fast dry pavement marking contract on routes within small (S<2) urban areasSMADSR00056**C 0 to 6.19SMADSR00665**C 1.17 to 11.12SMADUS00042**C 0 to 4.86SMADUS00042**C 9.16 to 12.81SMARSR00004**C 1.79 to 10.01SMARSR00004**C 10.95 to 13.82SMARSR00095**C 0 to 13.1SMARSR00095**C 17.19 to 24.32SMARSR00098**C 9.68 to 10.96SMARSR00309**C 18.88 to 19.02SMARSR00423**C 0 to 8.5SMARSR00423**C 11.37 to 16.37SMARSR00529**C 2.59 to 9.29SMARSR00739**C 0 to 7.38SPICSR00056**C 0 to 17.36SPICSR00316**C 0 to 11.27SPICSR00316**C 11.55 to 13.05SPICSR00316**C 13.68 to 14.05SPICSR00762**C 0 to 3.01SPICUS00022**C 15.98 to 17.14SUNISR00031**C 2.09 to 7.08SUNISR00038**C 0 to 7.61SUNISR00245**C 0 to 7.65SUNISR00736**C 0 to 7.95SUNIUS00036**C 13.87 to 18.89~|~21 - Safety~|~E41B72149F189AD20281211CDF515C793D2C690C 100766~|~1~|~4~|~04/S>2~|~Districtwide fast dry pavement marking contract on non-NHS routes within the Columbus Urban AreaSDELSR00003**C 1.38 to 8.74SDELSR00037**C 0 to 7.47SDELSR00061**C 0.43 to 2.72SDELSR00257**C 0 to 1.53SDELSR00257**C 4.12 to 4.56SDELSR00315**C 0.67 to 1.73SDELSR00521**C 2.29 to 13.62SDELSR00750**C 0 to 2.26SDELSR00750**C 4.21 to 4.46SDELUS00036**C 2.67 to 7.43SDELUS00036**C 22.17 to 28.61SDELUS00042**C 9.51 to 9.69SFRASR00003**C 20.39 to 21.36SFRASR00003**C 21.8 to 22.77SFRASR00003**C 22.91 to 23.04SFRASR00003**C 24.31 to 24.33SFRASR00003**C 24.35 to 25.01SFRASR00003**C 25.24 to 26.16SFRASR00605**C 1.71 to 3.17SFRASR00665**C 3.33 to 5.18SFRASR00665**C 7.39 to 8.59SFRAUS00040**C 0 to 4.02SFRAUS00062**C 0 to 1.64SFRAUS00062**C 2.97 to 5.63SFRAUS00062**C 8.07 to 8.54SFRAUS00062**C 10.8 to 11.69SMADUS00040**C 15.92 to 16.14SPICSR00674**C 8.96 to 10.93~|~21 - Safety~|~69313DB7FAB229DC55731A928AC623FD95B2F6C4 91975~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7767862 Blackberry Drive Bridge over Brandywine Creek.~|~~|~FFDF4225DC6A57EB78BB08ED222F305A6C89BF77 102239~|~1~|~1~|~01/STR~|~Bridge Replacement: HUR-601-01.85 SFN:3904474~|~10 - Bridge Replacement~|~87148B3854B3324063707531B0834760CFAA0D1C 87236~|~1~|~1~|~01/STR~|~BRO US59 0.00 - 8.37 Resurfacing ProjectOn US50, begin @ Clermont County line east to Highland County line (SLM 0.00 - 8.37), it is proposed to resurface the highway with aspahalt concrete.80/20 split~|~05 - 4R Maintenance - Resurfacing~|~16189B52F2D1F87DC562D27883A45B19F35CBEF0 87236~|~1~|~2~|~02/STR~|~Joint repair.0800481 BRO US50 1.98 Intersect: Glady Run0800511 BRO US50 4.49 Intersect: E Fork Little Miami River~|~13 - Bridge Rehabilitation~|~7DB85C028ED6191CBA57D0E79172E6D0FA135C06 92843~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~E4BE54BEC6F8A2CFF37A607312F810F9E54B8B0D 126264~|~1~|~1~|~01/SAF~|~Roundabout~|~21 - Safety~|~3F6CCF6D628D6A50ACE5120C2D544DAAFDA6B625 126264~|~1~|~2~|~02/SAF~|~Proposed roundabout~|~21 - Safety~|~4956ED9B0F830D9E0FD48FE90F52D29127C42AC5 126264~|~1~|~3~|~03/SAF~|~Proposed Roundabout~|~17 - Construction Engineering~|~025289DA691E8F798D6B51016C3E76692EBD5495 126320~|~1~|~1~|~01/NFA~|~Created plan split for detailed design - NEVI Round 3.~|~~|~2F83CB6DA028A77EDED72550B7211558163DAC85 126320~|~1~|~2~|~02/NFA~|~Created plan split for construction - NEVI Round 3.~|~~|~D381BAF17268D86E7AE01FC3723D49D6E46B802E 114427~|~1~|~1~|~01/NHS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for SR 7 in Belmont and Jefferson counties.~|~21 - Safety~|~6A3F39E1956A6AE4A5494B6B49D2A4D1943B1D00 92065~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~A1FCD59408DFD3DC626E5C1EC94C6763150D8F4F 98996~|~1~|~1~|~01/NHS~|~All costs associated with painting and replacing the wearing surface of the HAM-50-1903L and HAM-50-1903R bridges. Railroad reimbursement for flaggers will be a separate funding event.~|~13 - Bridge Rehabilitation~|~938683EFD491F690F4BA7AFB99E540402283E176 94375~|~1~|~1~|~01/ENH~|~Landscaping and signing enhancement to the SR-711 at US-422 interchange in the City of Youngstown, Mahoning County, Ohio.~|~31 - Landscaping & Other Scenic Beautification~|~BCAAC9DCC1F046FEEAFCC7B30325E7D0BA1949A5 115198~|~1~|~1~|~01/SAF/COL~|~Guardrail repair/replacement on multiple county roads with 100% CEAO Safety (4HB7).~|~21 - Safety~|~3FF34FFDADFA8D050DE7F5D57B27CB2EFC87F69F 94181~|~1~|~1~|~01/S<2~|~London urban paving on SR-56 & SR-38 / Main St~|~05 - 4R Maintenance - Resurfacing~|~3181F6E0CA0F5C52D04271DA1A2F93FED9B9000D 109771~|~1~|~1~|~01/IMS~|~AC Overlay with Repairs.~|~05 - 4R Maintenance - Resurfacing~|~02D079CDF6598297B42E73909616F694450EAB56 122395~|~1~|~1~|~01/NFA~|~Plan split for paving work in Harrison Lake State Park~|~05 - 4R Maintenance - Resurfacing~|~9EAAB8B3D16EADD9829F419CB7A464AAF8259166 100257~|~1~|~1~|~01/MPO~|~Rehabilitate Lakewood Heights Blvd using MPO STP funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DA84141FB33A1A431D9D0BE18C49D6C3EB527A0E 119092~|~2~|~1~|~01/NHS~|~Resurfacing WAS-7-7.18-14.03~|~05 - 4R Maintenance - Resurfacing~|~0CA2F3D3B1EFD644A9CE8A279681E78DCE2BAED0 83622~|~1~|~1~|~01/STR~|~80/20 funding split for federal rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~833B74B4849CC3FED63E3BFE1A7884F0B98C1CE4 120294~|~1~|~1~|~01/SAF/STCE~|~Guardrail upgrades on various routes throughout Stark County.~|~21 - Safety~|~BEE21F97CB47CD6754B0DFD8E07DD19D295E6C17 121424~|~1~|~1~|~01/NHS~|~All interchange work included in this split.~|~04 - Reconstruction - No Added Capacity~|~40DFB41D7BB170D80D35F2686182E11AAE5ADA57 121424~|~1~|~2~|~02/NHS~|~All work on the proposed structure for the new interchange. SFN 8803902~|~08 - Bridge - New Construction~|~1E8881259068B4A687A43FD88CE1B78B249090CB 121424~|~1~|~3~|~03/NHS~|~All incidental bridge work related to building the new interchange on SFN's 8800243 & 8800278. ~|~47 - Bridge Preventive Maintenance~|~2D36A024F8E99809C1832C50CBA17C5C191A117A 107720~|~1~|~1~|~01/NFA~|~Slide repair BRO 221 6.77~|~04 - Reconstruction - No Added Capacity~|~7558CA317552D7121AA301C4F28669CE0F8E7E1C 113294~|~1~|~1~|~01/NFP~|~Overlay existing parking lot with asphalt concrete along with striping, pavement repairs and minor drainage repairs.~|~05 - 4R Maintenance - Resurfacing~|~CDD2ABB57CB598CD2C714D6DEA527692582688AF 119004~|~1~|~1~|~01/BRF/TRCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~AC1F3F12A2BB147425919C49714C13F7874B91D9 116384~|~1~|~1~|~01/IMS~|~BEL-70~|~05 - 4R Maintenance - Resurfacing~|~A8C3F36F694DAF2B2B66F48410C2993CF80CFFC1 91458~|~1~|~1~|~01/STR~|~Resurfacing with an asphalt overlay with repairs. MRG SR 60 9.36-21.83. Minor Art., Fed. Aid Route. Federal 80%/State 20%.~|~05 - 4R Maintenance - Resurfacing~|~78A1AEF3198B62FB00FA0A7545707453C09F6F28 94547~|~1~|~1~|~01/BRF~|~The project will replace the existing pre-stressed concrete beam bridge deck over the North Branch of Sycamore Creek.~|~13 - Bridge Rehabilitation~|~98C3C475D0EBD94047FD32483D39A0CA5AFF247B 97592~|~1~|~1~|~01/STR~|~LAW SR 217 (SLM 5.92-5.98) Slide Repair~|~44 - Other~|~81D40DA02268E307CB7F458B3A9138650ADCD877 103701~|~1~|~1~|~01/SAF~|~Sidewalk and ped heads at 100% 4SC7 (includes 20% TRC)~|~28 - Facilities for Pedestrians & Bicycles~|~C22A606779FA7AB5A19EB8D4530F6FD3D499B026 91705~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. NHS route funded 80 federal/20 state. HOC US 33 and ATH US 33~|~05 - 4R Maintenance - Resurfacing~|~B14A38B20FC611A04BFF6819C51DA9F6D4B0FD39 91705~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. Rural other federal aid funded 80 federal/20 state. HOC SR 328 and HOC SR 595.~|~05 - 4R Maintenance - Resurfacing~|~4153627D0A375EDFDB4D7FFA27472925439DCFFB 91705~|~1~|~3~|~03/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~4C14BA5CFF1955454B0CF06C0282E2E67D9A45AE 89278~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for STP funds~|~05 - 4R Maintenance - Resurfacing~|~837C9A226247ECA47CAFAC6023E560401CE87232 89278~|~1~|~3~|~03/S>2~|~100% local participation for the pavement replacement work and other work items not eligible for urban resurfacing funding.~|~05 - 4R Maintenance - Resurfacing~|~7D90F898BFC936263C72AD71158F89F99460064A 89278~|~1~|~2~|~02/S>2~|~Split for slope repair work using GSM funding~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~75BE566F9E72A5A1490B8E3A5DF2F38BB36E58A8 89489~|~1~|~2~|~02/STR~|~Culvert Split 80/20 Fed/State:MRW-314-14.41; MRW-97-4.50; MRW-288-3.90; MRW-288-4.61~|~44 - Other~|~288B4D9CE60548A3180C00EE97ABA2F9AF85F5B1 89489~|~1~|~1~|~01/STR~|~Geotechnical $'s (4SF7/4SS7) for slope and ditch work01/STR/OT/GEO~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE91583C3A230369AA384FFC3E86541E17D5981E 89489~|~1~|~3~|~03/IMS~|~Line culvert at MRW-71-19.34~|~44 - Other~|~C8058A23A3538B82F6EAA8767B21F23F82A70036 88276~|~1~|~1~|~01/SAE~|~Signal upgrade in the City of Cleveland using 100% Safety funding.~|~44 - Other~|~F2A273B2997F6982B966061882C57DDE03687F2D 119274~|~1~|~1~|~01/STR~|~Replace deck on structure over the Little Darby Creek (SFN 8001952)~|~13 - Bridge Rehabilitation~|~D65E622BBC75CB01EC560D2D992D1B607D4D4881 88783~|~1~|~2~|~02/NHS~|~District Preservation funding split to participate in the painting of bridges HAM-27-1182 (SFN 3118010) and HAM-27-1184 (SFN 3118002) that carry Ronald Regan Highway (CR 453) over Colerain Ave (US 27). This plan split is only for the costs associated with the painting and MOT caused by the painting. This funding split does not include costs for overlays on these bridges or other bridges. Agreement per 5/13/13 meeting with HCEO and Colerain Twp is that the Colerain Twp will pay $50,000 (capped), and ODOT and HCEO will split the remaining $500,000 for the painintg. ODOT's funds will be capped at $250,000 since this is a local let project.~|~13 - Bridge Rehabilitation~|~0BDD2B362768B286F37EA782F64F0EE59612053A 88783~|~1~|~1~|~01/NHS~|~Ronald Reagan Cross County Highway: from the Springdale Road overpass to 1000 ft. east of US-27/Colerain Ave. Project includes pavement rehabilitation/resurfacing, guardrail replacement, upgrades to lighting, and new pavement markings.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1DC6CE22D173593FE89F54F6111EB7ED5CC58413 88783~|~1~|~3~|~03/BRO~|~Bridge rehabilitation including removal and replacement of expansion joints, replacement of bridge deck wearing surfaces, painting of structural steel, etc.~|~13 - Bridge Rehabilitation~|~E4422CECB5B12822903ABB8892D225EC72F4CA67 117435~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6AE599CF509C619A1A01B92CA6EB7A0BE837DB0B 97324~|~1~|~1~|~01/STR~|~Culvert replacement project. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FDC13AF73873B83CBE71B8D1A0B29AA31AA981C9 89259~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for Urban Paving funds~|~05 - 4R Maintenance - Resurfacing~|~4802BA423A0C147CF636311416F8963934EC1ED5 89259~|~1~|~2~|~02/NFP~|~Split 2 for 100% local cost for items of work not eligible for urban paving~|~05 - 4R Maintenance - Resurfacing~|~13BB41CF2A15ADC13D4A2EAF113331D41C6538D6 89259~|~3~|~3~|~03/NHS~|~Fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~690BACF97F0C5AC508200189481E3423228BEDCB 106710~|~1~|~1~|~01/ENH~|~Construction of a multipurpose trail.~|~28 - Facilities for Pedestrians & Bicycles~|~01B4FB52BA8A8C4A5FAF95B69371ECF64E017B25 106929~|~1~|~1~|~01/STR~|~Prevailing wage tree cutting contract.~|~44 - Other~|~26CCC61009AEA3BA112F2F220B477E602B93CA52 96352~|~1~|~1~|~01/SAF~|~safety funded project on IR-280 and SR 420~|~21 - Safety~|~6772E71F534D2D3CC47DF9CF9FB905B9C2311831 85100~|~1~|~1~|~01/MPO~|~LUC CR508 0.6-1.34~|~03 - Reconstruction - Added Capacity~|~2FCA2A91D325E51ADA37DC6D6FD338010456F3A7 112375~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~117C7A47CCAFDD382320C6BB7A5DAD2CE0AF5659 118902~|~1~|~1~|~01/SAF~|~CEAO HSIP funding for safety improvements~|~21 - Safety~|~1E6CAA337B4E631F1E8DD977D17B1690F82D3C81 125979~|~1~|~1~|~01/NHS~|~Plan split for slope repair of US-24~|~04 - Reconstruction - No Added Capacity~|~670D2856B92B6314471646BEDE9E1202E19E6E2A 97551~|~1~|~2~|~02/BRF~|~Ohio Bridge Partnership Program. SFN 4740017, Snell Road~|~10 - Bridge Replacement~|~E8982FE9D1447AA5823BA523A6C946006F8CEE27 97551~|~1~|~1~|~01/BRO~|~Ohio Bridge Partnership Program. SFN 4738411, Parsons Road~|~10 - Bridge Replacement~|~EEA0EC02AEF7DD8DB2C1C7AE70241BA0F8579326 90360~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~26955237742CAA91956B5059A6CD30575B025F50 89345~|~1~|~1~|~01/S<2~|~This Plan Split is for the road reconstruction work eligible for federal funds from the small cities program.~|~04 - Reconstruction - No Added Capacity~|~C6E5327A6CBABE4A7EE579E7B3AA0B27015832DB 89345~|~1~|~2~|~02/S<2~|~The Plan Split is for 100% locally funded utility work that is not eligible for federal funds.~|~43 - Utilities~|~EC9E05670FBA2DB98E75D2E00C44B9C6D360846A 114000~|~1~|~1~|~01/NFA/GCEO~|~"01/NFA/PV/GCEO" - 80% Federal (4B77) and 20% Local (LNTP) - resurfacing of minor collectors - CR 73, CR 670, CR 690.~|~05 - 4R Maintenance - Resurfacing~|~D1007350A943E51A67E5D467FB7F4B101EB72BE9 114000~|~1~|~2~|~02/STR/GCEO~|~"02/STR/PV/GCEO" - 80% Federal (4B77) and 20% Local (LNTP) - Resurfacing and related work on CR 57.~|~05 - 4R Maintenance - Resurfacing~|~4119241CE1D305DA5BD11B744F85C53D564740F5 97596~|~1~|~1~|~01/NFP~|~Split 1 - Airport improvements~|~44 - Other~|~6EB328C484490438CE340E3F1EF153426D724E47 106249~|~1~|~1~|~01/NFA~|~The Township will extend Southwest Parkway 475 Linear Feet to the south from its existing terminus and match the existing road profile as to width, curbs and gutters, drainage and other features.~|~01 - New Construction~|~F817AF60E8671AE17B0EDBAED4355D7DB4BE3026 122801~|~1~|~1~|~01/NFA~|~GR replacement in Highland County.~|~21 - Safety~|~DB7C3426A2B420169CBDB2052098D28D5F66AC25 112754~|~1~|~1~|~01/MPO~|~Resurfacing of Johnson Rd from Hametown Rd to Norton East Corp Limit in the City of Norton.~|~05 - 4R Maintenance - Resurfacing~|~93D9DF3CE8352EFC8A3AB3BFB3DD2ADFF9155A73 110540~|~1~|~1~|~01/STR~|~Resurfacing the Rural section of PRE-127 in the project and the bridge expansion joint work. PRE-127 SLM 4.589 to 11.194~|~05 - 4R Maintenance - Resurfacing~|~A2C295037D9F4D7C3B503F851467E8B2EA9922D2 110540~|~1~|~2~|~02/S5K~|~Resurfacing the urban section of PRE-127 in the project: roughly SLM 11.19 - 12.04~|~05 - 4R Maintenance - Resurfacing~|~F2323E3BD748A3886A10889168E87C752489D705 100671~|~1~|~2~|~02/S<2~|~Chip Seal of SR 164 from SLM 15.67 to 16.87~|~05 - 4R Maintenance - Resurfacing~|~29AC2916B2497E988D5E50D5D4669A4ABD2B6217 100671~|~1~|~3~|~03/NFA~|~Chip Seal on COL-164 from SLM 16.87 to 18.00~|~05 - 4R Maintenance - Resurfacing~|~6D7680A894E9946F38ECA83EC0A8E9CCBAAD9085 100671~|~1~|~1~|~01/STR~|~Chip sealing on COL-154 and on COL-164 from SLM 4.46 to 9.78.~|~05 - 4R Maintenance - Resurfacing~|~5E38387D98DBBF95184DDCE722786053B86C2539 98393~|~1~|~3~|~03/S<2~|~Minor Bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~F8D96C899B5CFBDA4D4BCBE238D0CD64C51D3B42 98393~|~1~|~4~|~04/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~8B9AC6752DC53D956E911F7BD0417A831AD444EA 98393~|~1~|~2~|~02/STR~|~Resurfacing of STA SR 225 from 1.15 to 4.24.~|~05 - 4R Maintenance - Resurfacing~|~729F382F7481095C21F75CB0AA50D4990C042B0C 98393~|~1~|~1~|~01/S<2~|~Resurfacing of STA SR 225 from 0.78 to 1.15.~|~05 - 4R Maintenance - Resurfacing~|~1B6A47D9508465E04368F2F7FD7ED257558499EB 91466~|~1~|~1~|~01/SAE~|~Remove the slip ramp from the eastbound exit of IR275 to US22 and replace with standard right turn lane. Safety funds~|~21 - Safety~|~CA20A21942EFE18DA9E98423DC412F2B977FE635 120443~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~3384B00D1C6A441F41E342F5F6E47EF81259D18D 83872~|~1~|~2~|~02/STR~|~JAC SR139 0.00 - 14.42Bridge Rehab4002466 JAC SR139 1.04 Intersect: Holland Fork Creek4002717 JAC SR139 9.87 Intersect: Br. of Four Mile Creek80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~02A26DA31D1AAA01B5BA15954A037D6F29214F9E 83872~|~1~|~1~|~01/STR~|~JAC SR139 0.00 - 14.42 ResurfacingOn SR 139, begin project at the Scioto County line, head north and terminate at the south corp limit of the City of Jackson, it is proposed to resurface the existing pavement w/asphalt concrete to maintain the structural integrity and provide a smoother ride. Brdg pave thru.4002490 JAC SR139 3.17 Intersect: Trib of Holland Fork4002636 JAC SR139 9.16 Intersect: Br Of Four Mile Creek4002687 JAC SR139 9.76 Intersect: Four Mile Creek4002733 JAC SR139 10.22 Intersect: Br Of Four Mile Creek4002768 JAC SR139 10.52 Intersect: Branch Of Fourmile Creek4002857 JAC SR139 12.45 Intersect: Macdowell Run80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~4A37C8C3607606DFF4093DD1DBDAE1578433F5DB 93137~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Per-SR 155-00.00 to 07.45 2)Per-216-0.00 to 01.88 3)Per-595-00.00 to 02.10 4)Per-93-01.07 to 3.90~|~05 - 4R Maintenance - Resurfacing~|~823EFE3055FEFD41F8D4F83034A6F7A1D7527F23 114842~|~1~|~1~|~01/IMS~|~Remove the abandoned RxR bridge over Interstate 75.~|~44 - Other~|~0F948DA8E82FCAC2D0B0B4FDE20AA17F3A5EE717 97054~|~1~|~1~|~01/NHS~|~Culvert replacement CFN 760623830 STA-US 62-29.53~|~44 - Other~|~BA39D90DDFFB2786808BFD34FD04CBF6A8D67C2D 96535~|~1~|~1~|~01/IMS~|~Emergency project to repair bridge deck patch that is failing.~|~47 - Bridge Preventive Maintenance~|~5635F4DA0C46D6250BB6410BAF90559A651BB9E2 93563~|~1~|~1~|~01/NFA~|~Design Build Project for the construction of a new salt barn at the Wilgus Outpost. 100% State (4MA7) 01/NFA/OT/State~|~17 - Construction Engineering~|~5C39D7396D1323FC690015148D6E77604446AA3B 114627~|~1~|~1~|~01/S<2~|~Overlay on ROS 138.~|~05 - 4R Maintenance - Resurfacing~|~293B749C2E1712AB078398074166077454BB96C1 114627~|~1~|~2~|~02/STR~|~Overlay on ROS 138.~|~05 - 4R Maintenance - Resurfacing~|~C044C90B9A29CDBDE7B0D573BF18528996629F29 93139~|~1~|~1~|~01/S<2/MTVE~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Urban Paving resurfacing with associated work on Kno-SR 3-17.82 to 18.95~|~05 - 4R Maintenance - Resurfacing~|~E8B4DB9F4B2DE4F60949C268C51D4F60868E1536 93139~|~1~|~2~|~02/S<2~|~District Preservation Paving Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Kno-SR 3-18.95 to 20.59~|~05 - 4R Maintenance - Resurfacing~|~20A4B93AAA7A51746E9A609A707939946D6AB758 93139~|~1~|~3~|~03/STR~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Kno-SR 3-20.59 to 34.71~|~05 - 4R Maintenance - Resurfacing~|~6F3A620BE89C65F2CCAD404A79D58748813EE45D 93139~|~1~|~4~|~04/SAF~|~Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - installation of centerline rumble strip.~|~21 - Safety~|~9940B37B06F7798593AEE65A644C2B12CF84116F 88771~|~1~|~1~|~01/BRO~|~Replace deteriorated bridge deck with minimal approach work. Includes repair of pier columns and miscellaneous steel and concrete repair on SFN 5704359 MOT SR 49 0898 R over Interstate 70.~|~13 - Bridge Rehabilitation~|~D40DB79C2EF106BC7D7E732F692F10B794BC8E4D 118425~|~1~|~1~|~01/STR~|~WAY SR 0057 06.73 ~|~04 - Reconstruction - No Added Capacity~|~941EBA94B5BC56F50A08A10565EBD017BADF5385 87796~|~1~|~1~|~01/NHS~|~SCI US52 38.34 Intersection Improvement 1.29 miles west of the Scioto/Lawrence County Line Project Description: It is proposed to add a two left turn lanes and one right lane at the intersecions of US52 and Haverhill - Ohio Furnace Road (CR8). Legislation will be required and there is a railroad involved. 80 Fed/20 State 01/NHS/PV/State~|~21 - Safety~|~057DE6E027CFAB1B750FC7587214F49A9692F646 105761~|~1~|~1~|~01/BRF~|~Federally eligible items for the replacement of bridge (SFN 2534231)~|~10 - Bridge Replacement~|~AEEBDFA243BAC5C32F68A5EC607AB38135B83A6D 112728~|~1~|~1~|~01/MPO~|~Install sidewalks along East Cook Road~|~28 - Facilities for Pedestrians & Bicycles~|~95D25F21D78894F592BF915FC5FE570A4ED018B2 105845~|~1~|~1~|~01/IMS~|~Added plan split.~|~~|~7FD2B2D4515172ABE0EA2F47378B1962379596F6 126073~|~1~|~1~|~01/SAF~|~Plan split for RPM replacement work~|~21 - Safety~|~C5467E4F83CCCB24541BF7A38ABBA4FE1C45540B 107555~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~44 - Other~|~E5BB69F863D98BFA9B43EB72BCD43D275B4C57FF 107741~|~1~|~1~|~01/NHS~|~Landslide repair on WAS 7 41.7-41.85. 100% State Emergency funded (4BE7). NHS Route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~23943C41E95F5B53C8819D4A01F2B47843555B1F 101225~|~1~|~1~|~01/NHS~|~CO CO Contr 01 plan split 1 created for the following NHS routes: FRA-40-3.15-4.69 FRA-62-8.56-10.67~|~05 - 4R Maintenance - Resurfacing~|~5C9F5C0FAC4723F271F2C5DFB2D5350328719416 101225~|~2~|~2~|~02/STR~|~CO CO Contr 02 plan split 2 created for the following STP Rural routes: FRA-315-2.37-5.18~|~05 - 4R Maintenance - Resurfacing~|~1F56C18A4AAAD836CDD4512CF40670F05CCF57DB 101225~|~1~|~3~|~03/NHS~|~CO CO Engr 01 plan split 1 created for the following NHS routes: FRA-40-3.18-4.69 FRA-62-8.56-10.67~|~17 - Construction Engineering~|~3D765EFE7CDB450ED0782FF6BD00C78CB7AB7FD7 101225~|~1~|~4~|~04/STR~|~CO CO Engr 02 plan split 2 created for the following STP Rural routes: FRA-315-2.37-5.18~|~17 - Construction Engineering~|~47A11AF391BA1A33C94E7AA9DDE0678F25E44816 107022~|~1~|~1~|~01/IMS~|~Bridge Split~|~13 - Bridge Rehabilitation~|~B26356A4CD7206C9AC3D18F6A5E9707985095572 76007~|~1~|~1~|~01/CMQ~|~Plan Split for CMAQ Funding~|~21 - Safety~|~15B8A95A889EAD1305ACA1324C963AD443C31943 76007~|~1~|~2~|~02/S>2~|~Plan Split for Local Funding for City of Canton for non-warranted signals~|~21 - Safety~|~4200A2419B4901F356EB8D3406FFF7E3DB6474AC 118857~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~A31B561C45EDAF48441AD38EDB24107AF6AC4275 107999~|~1~|~1~|~01/NFP~|~Guardrail.~|~44 - Other~|~CBE44ABF658A1C8BB862C2FA0844163379820358 107999~|~1~|~2~|~02/BRO~|~Bridge railing hit in an accident and requires repairs. Replace damage deck edge and railing.~|~13 - Bridge Rehabilitation~|~D663BF91C64C64D61285E973EE46767522229F63 97255~|~1~|~1~|~01/STR~|~District wide herbicidal spray project~|~44 - Other~|~91CAFCFEE105852771947BE1E770323665538842 99945~|~1~|~1~|~01/STR~|~Culvert Replacement~|~03 - Reconstruction - Added Capacity~|~2C17D67E991D1DE7524AA3ABE84B3D13F821B488 112239~|~1~|~1~|~01/IMS~|~Landscape maintenance at various interchanges~|~44 - Other~|~A8E47C39BA0A9E5029CB67506F52A0EA7EBF49A9 93230~|~1~|~1~|~01/MPO~|~Increase storage lane lengths to improve safety and minimize the blocking traffic. Work will be done between the existing bridge piers by reducing the lane widths to 11' and removing the concrete median. Eight foot shoulders will be maintained and will accomodate bike lanes. The left turn lanes are extended beyond the ramp intersections by removing the existing raised median on I-675 and Wilmington Pike Interchange.~|~21 - Safety~|~42F41CFCB7A183128A64A9304808B3C7A1289EF2 119054~|~1~|~1~|~01/NHS~|~All work on NHS bridges included in this plan split. ~|~47 - Bridge Preventive Maintenance~|~DC5ECEAB64216BA1296D6CDB99F1228BA1D77A65 119054~|~1~|~2~|~02/S50~|~All work on SFN 0200999 that falls under the STP category. ~|~47 - Bridge Preventive Maintenance~|~52AB2444984A8152703AD20A7DEEAF28CB2B64A1 112592~|~1~|~1~|~01/IMS~|~resurfacing on CLI-71~|~05 - 4R Maintenance - Resurfacing~|~12F4AA21CCF177A7CD8C854E1478707E6BC8BEF6 97002~|~1~|~1~|~01/NFP~|~Pipe replacement, Hiram Township, Portage County, Ohio.~|~44 - Other~|~BE92D298248F99575438081A959DA6117458B0BC 112503~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~E3AAAF06862450036E859EC322B1B4653F588272 112503~|~1~|~2~|~02/NFP~|~Retro fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~C9FFD32883C245BFF928863C3CB66AB07CF17A2F 123989~|~1~|~1~|~01/ENH~|~New sidewalk throughout the Village of Zaleski connecting to the Moonville Rail Trail trail head.~|~28 - Facilities for Pedestrians & Bicycles~|~5C81BF615C56C0BAAB04C05F03FC3ECE924B272F 100955~|~1~|~1~|~01/S<2~|~Install sidewalk on the south side of Barrington Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~94AA7EED23990D1C849ED353894E8B6753E1D6EF 120750~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~DE09BB2F279EF474FCB1351652089328550EFFF0 99880~|~1~|~1~|~01/SAF~|~Construction of a westbound left turn lane from Tylersville Road (CR-20) to southbound Chantilly Drive (TR-1824).~|~21 - Safety~|~846C67F771063147597785C21C5E6BF658E9F1BA 99880~|~1~|~2~|~02/NFP~|~Plan split for 100% waterworks items included in this project.~|~43 - Utilities~|~BE1163BAEDDDB8CE4F98A101206842D220F39EEF 92961~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation Pavement Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on OFAH-Rural route Kno-SR 95-00.00 to 05.69~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~76DB90B57978AF99CF5D3CEB4EADBD3BA2ED8438 92961~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work: 1) Kno-SR 13-11.81 to 12.06; 2) Kno-SR 13-12.08 to 16.00;~|~05 - 4R Maintenance - Resurfacing~|~20BFFFBB6E8A665AF12E6AF462A402AE0CA9EB83 92961~|~1~|~3~|~03/NHS/MTVE~|~"03/NHS/PV/MTVE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Mount Vernon on the following NHS Routes: 1) Kno-SR 13-09.15 to 11.81; 2) Kno-SR 13-12.06 to 12.08; 3) Kno-SR 13D-00.19 to 00.51~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DF0B0F6FAA2C9FE8C1BB315891DFEE3D3DED08C5 125169~|~1~|~1~|~01/SAF~|~District wide polyester pavement markings~|~21 - Safety~|~0849B3F93AF4EA5CC979E71DC02E28BCD374E1F9 120454~|~1~|~1~|~01/NHS~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~30CA87ECD29BF63CE58289A4F4E64490D2D85317 120454~|~1~|~2~|~02/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~20341A533F23BFC53F4F49CBE3F90F89D752DDDE 96495~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement contract for FY 2017. WAS 618 2.24-3.00. Urban other federal aid funded 80 federal/20 state.~|~21 - Safety~|~A8974CD77F53F7D9411F606FC9DCFEF87EAF3591 96495~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement contract for FY 2017. Routes include: MOE 26 0.00-14.60, MOE 536 5.29-6.35, MRG 377 4.27-4.61, VIN 124 4.63-4.83, VIN 160 8.45-17.25 and WAS 26 2.64-29.36. Rural other federal aid funded 80 federal/20 state.~|~21 - Safety~|~416B02DEE3F211FEF6691F159B3E616E4EB71690 100479~|~1~|~2~|~02/S<2~|~SCI 239 (0.72-1.22)~|~05 - 4R Maintenance - Resurfacing~|~CF3CF7C582041150762F082594FE070378773C3C 100479~|~1~|~1~|~01/STR~|~SCI 239 (0.00-0.72)~|~05 - 4R Maintenance - Resurfacing~|~192AF251D49EB46A4870C45579FE6FA5693069F0 100479~|~1~|~3~|~03/NHS~|~SCI 52 (8.67-15.77)~|~05 - 4R Maintenance - Resurfacing~|~B261F25E8601033179F4DA4ECCC54A4AB7AD8FA7 104946~|~1~|~1~|~01/IMS~|~Bridge Concrete Deck Overlay on FRA-62-21.81~|~13 - Bridge Rehabilitation~|~6C112EB266BF097665A27F50FEB79CF640326722 116238~|~1~|~1~|~01/NHS~|~Smoothseal in ROS.~|~05 - 4R Maintenance - Resurfacing~|~665E9B6955B3B732AC5F11A224BAD4D6E17DB060 116238~|~1~|~2~|~02/NHS~|~Added bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~A25E7879C71476390D573BBEC7CDE77952A04C91 114613~|~1~|~1~|~01/SAF~|~Construct a single-lane roundabout at Elk Creek Road in Middletown.~|~21 - Safety~|~82F915FDFA7342D685460E003AEDF2EB15049F35 114613~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded utility work, funded by Southwest Regional Water District.~|~43 - Utilities~|~1F2B2E17D9B163B426834AA5C22D3285099BB704 102835~|~1~|~1~|~01/STR~|~Smoothseal; MRW-95-8.13 to 15.33; MAR-309-22.77 to 29.21; MRW-3090.00 to 2.48~|~05 - 4R Maintenance - Resurfacing~|~FF8E60B58D52824363CB92CE7A12AE24A158325B 102215~|~1~|~1~|~01/STR~|~LAW CR 31 3.16 ER Slide repair.~|~~|~C2BC398DA34D9FE903C55257279F5DE2153D16DC 115608~|~1~|~1~|~01/NFP~|~Mowing.~|~44 - Other~|~E4EC02F8F0D3A6AA57F1BF219DE6D5F4EF3C6BF4 126277~|~1~|~1~|~01/STR~|~Plan split for construction items that are federally eligible. ~|~10 - Bridge Replacement~|~C578DAC65B2D1BD53E43B38FE8DA5684E04BD813 119700~|~1~|~1~|~01/SAF~|~Construct sidewalk on the north side of W Plane St (SR-125) in the Village of Bethel. Project to include pedestrian curb ramps and crosswalks.~|~28 - Facilities for Pedestrians & Bicycles~|~BBE94A5C5390861294005E2E703F5F3273A8E968 127125~|~1~|~1~|~01/ENH~|~Construction of sidewalk along SR 435 in Fayette County.~|~28 - Facilities for Pedestrians & Bicycles~|~B5A6D32265E1EDA72FF1C8D32ACF2FEB8681C67F 122037~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~5A65008C7C55E679284DC63443D2C6094B21F1EA 125829~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~E061B860F3565747F2AB83495C56784E0F5F2D72 122084~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR 70 1.957, SFN 5833256.~|~10 - Bridge Replacement~|~974D2DB1C6C3E6166C0C7D3F2951336963FF2CB1 96753~|~1~|~2~|~02/S<2~|~HEN-6 Urban section (10.94 to 14.97)~|~~|~B7F155E58F8C77A1980381470BE3B9E495EA1CCC 96753~|~1~|~1~|~01/STR~|~HEN-6 rural section (14.97 to 17.22)~|~~|~DF0B2D2A5EF06FF92F29A4712DC11629D829FDED 98965~|~1~|~1~|~01/IMS~|~Split for culvert work~|~44 - Other~|~1237E0371C69F0BB99A8F2231407908A136F1150 95778~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 6.98~|~05 - 4R Maintenance - Resurfacing~|~2F097BD460E9E46C5B07AC03E0F9D4B97166D599 95778~|~1~|~4~|~04/S<2~|~Urban Paving Split: SEN 100 8.3-8.9 & 9.3-9.84SEN-53-8.36-8.63~|~05 - 4R Maintenance - Resurfacing~|~1C9A1BB580338519A82D5B2F0542789A16517F91 95778~|~1~|~3~|~03/STR~|~SEN-100-3.89 Bridge~|~13 - Bridge Rehabilitation~|~E45CE8F3F568FC32F5443440EA2E01F0E5200909 95778~|~1~|~2~|~02/S<2~|~Sen 100 From SLM 6.98 to SLM 8.30~|~05 - 4R Maintenance - Resurfacing~|~F76D47DE12553D77FBD53E2C2B0829A1FE058160 121890~|~2~|~2~|~02/ENH/ACMP~|~Construct new shared use path, Phase 1.4.~|~28 - Facilities for Pedestrians & Bicycles~|~C2BD877EA3A222C52B7CCB7E91AEE46385D95542 121890~|~1~|~1~|~01/ENH/ACMP~|~Construct new shared use path, Phase 1.3~|~28 - Facilities for Pedestrians & Bicycles~|~B0AC5BE4C562D13F86A476DF5EEB37403217710C 111844~|~1~|~1~|~01/BRO~|~KYTC's Share of the project.~|~13 - Bridge Rehabilitation~|~8C2C8CF6B8D9C0C2B80137F1702A3469993A4586 111844~|~1~|~2~|~02/BRO~|~OH's Share of the project.~|~13 - Bridge Rehabilitation~|~50318457AAF53307A5D9729BF0B6D15D6E480F08 97457~|~1~|~1~|~01/SAF~|~This plan split addresses all work required to demolish a house that was purchased to improve sight distance at this intersection.~|~21 - Safety~|~5E4B92A010CFA754DA100F6CED68B237E2AF60B8 119866~|~1~|~1~|~01/STR~|~All Work Included in this Split~|~66 - Resilience Improvement - Highway Project ~|~060E87B37231A5EB019FD5063E49DEFA65C18B06 95875~|~1~|~1~|~01/IMS~|~from SLM 0.56 to SLM 8.95~|~~|~67DFD66EE4E16D7F606C516ADE40C3511133275F 117743~|~1~|~1~|~01/NFP~|~Rest area project. All work is included in this split. ~|~44 - Other~|~A6259349E4B2B099DFE40A09478E86F7C38489D8 91765~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. VIN 93 2.15-7.47, 10.25-14.53. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~CD716D33FC41B73C8FC11AC08AFC554FEE2B8540 91765~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using a microsurfacing treatment. VIN 93 0.61-2.15. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~CC8BD883166E5E67C608D89BC7B45EDCCE05377D 77419~|~1~|~1~|~01/IMS~|~100% state funding split with bond and Major Bridge funds for the deck replacement of SFN 1806173 (CUY-77-0950) over the Cuyahoga River, SR-17, Canal Road, and CSX railroad.~|~13 - Bridge Rehabilitation~|~BCE2CAC5E12B61F57E744A2052B513F4FC7ECA13 77480~|~2~|~2~|~02/NHS~|~CRA-30 Bridge Work~|~13 - Bridge Rehabilitation~|~409282DE41EA132178389E774AA769938AD9DA5E 77480~|~1~|~1~|~01/NHS~|~CRA-30-4.24-9.92 - Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~BDE98C4FD1AF75CC35A04C54D5D4A000DB0627A4 77480~|~1~|~3~|~03/STR~|~CRA-98-9.23-9.39 resurfacing in rural section~|~05 - 4R Maintenance - Resurfacing~|~20E521BF81054B4376EBAB9058AA2F2F487AC322 77480~|~1~|~4~|~04/S<2~|~CRA-98-9.39-9.83 resurfacing in urbanized section.~|~05 - 4R Maintenance - Resurfacing~|~A60DD9E5F03951D0DD1AC0EB977EF7DF306BE3EA 109632~|~1~|~1~|~01/STR~|~Emergency repair on BRO 41 2.81.~|~04 - Reconstruction - No Added Capacity~|~213D4EB97BB7F7FB4BF5502DC46516B69F29F6AD 96630~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds SAC 4PS7.~|~21 - Safety~|~9F6E9B9AFDCEA8E3F498677D6DE3A5C061F65E5B 75945~|~1~|~1~|~01/IMS~|~Plane and resurface the existing roadway and other roadway related items on MOT IR 675 0.00 to 7.44 in Centerville from the junction of Interstate 75 to the Greene//Montgomery County Line.~|~~|~2D2588783884CF84E36F320A1FB8B995FE8F8F85 75945~|~1~|~2~|~02/IMS~|~Bridge repair as follows:SFN 5710707 - MOT-675-0055 L - joint sealerSFN 5710731 - MOT 675-0063 Y - curb remove and replaceSFN 5710766 - MOT-675-0063 L - joint sealer & patching concrete structure, as per planSFN 5710804 - MOT-675-0063 R - joint sealer & patching concrete structure, as per planSFN 5711193 - MOT-675-0299 R - polymer modified joint systemSFN 5711185 - MOT-675-0299 L - polymer modified joint systemSFN 5711274 - MOT-675-0411 R - joint sealer & patching concrete structure, as per planSFN 5711266 - MOT-675-0411 L - joint sealer & patching concrete structure, as per planSFN 5711479 - MOT-675-0742 R - curb removal and replacementSFN 5711460 - MOT-675-0742 L - curb removal and replacement~|~~|~2EB5D86B85C7D6C40972FB68A405132257A0D255 124268~|~1~|~1~|~01/ENH~|~Trail resurfacing~|~28 - Facilities for Pedestrians & Bicycles~|~A632DB12998F7605F3CC98A5A306E61BA51F73C0 91989~|~1~|~2~|~02/STR~|~LAW SR243 Brdgs F/Rehab:4403274 LAW SR243 4.98 Intersect: Trib Of Little Ice Creek4403304 LAW SR243 5.18 Intersect: Trib Of Little Ice Creek4403339 LAW SR243 5.48 Intersect: Trib Of Little Ice Creek4403371 LAW SR243 5.67 Intersect: Trib Of Little Ice Creek4403398 LAW SR243 6.1 Intersect: Ice Creek4403428 LAW SR243 6.25 Intersect: Trib Of Little Ice Creek4403452 LAW SR243 6.49 Intersect: Trib Of Little Ice Creek80/20 split~|~13 - Bridge Rehabilitation~|~4F3941AFB1B4620F3D784155E819F4B31CC8D6E2 91989~|~1~|~5~|~05/S<2~|~LAW SR243 Brdgs F/Rehab:4403223 LAW SR243 1.77 Intersect: Little Ice Creek80/20 split~|~13 - Bridge Rehabilitation~|~A20B5E1E31D1A3D4A4C22D72FE511AA6D956D37C 91989~|~1~|~4~|~04/NHS~|~LAW SR243 Brdgs F/Rehab:4403185 LAW US52 0.19 Intersect: Us Route 5280/20 split~|~13 - Bridge Rehabilitation~|~A2A0F5B64BD50584DA708AA6040D3B1F2D0C98C4 91989~|~1~|~3~|~03/S<2~|~LAW SR243 Resurfacing ProjectUrban Area portion: SLM 0.16 - SLM 2.58Brdgs F/Pave Thru:4403207 LAW SR243 0.76 Intersect: Stream80/20 splitExtra Work from 3rd St to SLM 0.16 along Kinley Ave. (Bridge Pavement Approach)~|~05 - 4R Maintenance - Resurfacing~|~DA18126F3B203BFD657182582DF599DB50F808A3 91989~|~1~|~1~|~01/STR~|~LAW SR243 Resurfacing ProjectRural portion: SLM 2.58 - SLM 7.22Brdgs F/Pave Thru:4403452 LAW SR243 6.49 Intersect: Trib Of Little Ice Creek80/20 split~|~05 - 4R Maintenance - Resurfacing~|~2A84F6CC54ACE0491DF3B480BBFA304D2FC0490D 122750~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~F93201FBE0B5F8BEC3003B92EC74F64BB4B9AD15 88940~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 11 from 7.68 to 9.97~|~05 - 4R Maintenance - Resurfacing~|~D0ADD8F51D7D5FAE1B7CD818F94A58EE25464FBF 116860~|~1~|~1~|~01/CMQ/NILE~|~Signal replacements.~|~21 - Safety~|~AD335B3257C4E1834E1B7752EBADB25992981B02 90784~|~1~|~1~|~01/BRF~|~Rehabilitate the structurally deficient bridge and widen the structure to accommodate a left turn lane as well as a bicycle lane (Harshman Road Bridge over the Mad River SFN 5761166 MOT MR **C 0.00~|~13 - Bridge Rehabilitation~|~99308312E195B4EA159BD523BA01FFEE2A2932F4 114769~|~1~|~1~|~01/NHS~|~SCI 23 overlay.~|~05 - 4R Maintenance - Resurfacing~|~7540B61193E844F3766A06035C8A2CAD3EC776FD 114769~|~1~|~2~|~02/STR~|~Added STP Rural plan split. ~|~05 - 4R Maintenance - Resurfacing~|~1C8F941154C39F0A87C01797A06479FB8041E278 94021~|~1~|~2~|~02/NHS~|~Minor bridge work >20' span.~|~13 - Bridge Rehabilitation~|~D60AD6D4C2AAFA3A43B789AE20CAA0DD7A965C1A 94021~|~1~|~3~|~03/NHS~|~Minor bridge rehab > 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~BF436DB9A16D621F8AFE31D3E5164BD535F92AC3 94021~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7E853FE42CC07BD2EEBA70B11B26D21EF5E1377F 110100~|~1~|~1~|~01/SAF~|~Plan split for traffic signals~|~21 - Safety~|~D6DFA3CC4C32846AFA71637CCE4668C6FDD004BA 87941~|~1~|~1~|~01/BRO~|~4807774 LUC IR475 8.03 Intersect: Cr 22-Bancroft Street~|~13 - Bridge Rehabilitation~|~AD648A88E23287E7DD1F5D055B84FD899AC2AF37 117268~|~1~|~1~|~01/STR~|~Plan split for extrusheet signs~|~21 - Safety~|~A7945A105182E49BB9A7154FEEF8BB30ED0F7C0F 122086~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~3F089E2FA7AF4171148C94E5BE4262CB019C8DCB 114669~|~1~|~1~|~01/STR~|~Project to repair bridge GRE-380-3.31 that carries SR 380 over Caesar Creek by replacing the wearing surface, and bridge GRE-380-0627 that carries SR 380 over Glady Run by repalcing the wearing surface and painting the structural steel.~|~13 - Bridge Rehabilitation~|~AD89A0C875B3F22B8D1BF687DA159107EB822E13 113922~|~1~|~1~|~01/IMS~|~District Preservation Pavement Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing work on a portion of LIC IR 70 and MUS IR 70.~|~05 - 4R Maintenance - Resurfacing~|~1D584DFE4F563BA14B340F95D5D0D0159E654B9F 113922~|~1~|~2~|~02/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Rehabilitation of Interstate bridges on a portion of LIC IR 70 and MUS IR 70.~|~13 - Bridge Rehabilitation~|~A52FC0B6342BF7B4A6A0C77166F278F10D14767B 113922~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~98E958F15853E2E480FE8619B43461711C6C393C 114615~|~1~|~1~|~01/NFP~|~Plan split for signal maintenance~|~21 - Safety~|~B285A52890A79A06D487608603D1CEFD8697EB98 109482~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~CA004A91C0F48676ED6833D8F37FD8203BA5A174 92842~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~E8AF3F61CC8D755BDF9508C3561E6BE69AD27166 102449~|~1~|~1~|~01/STR~|~LAW 217 17.38 Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~A93A7937F245184923339DB11EB7EED51C544C6B 109831~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in POR, STA and SUM counties.~|~21 - Safety~|~BB9931A9B5457CCD38D5A4415608FBBA513E2483 114474~|~1~|~1~|~01/STR~|~Resurfacing SR 800 from HAS Co. Line to SLM 7.49~|~05 - 4R Maintenance - Resurfacing~|~7BE3CA2841FDF42D08D7877654F3B9564AD91586 114474~|~1~|~2~|~02/S<2~|~Resurfacing SR 800 from SLM 7.49 to SLM 7.51~|~05 - 4R Maintenance - Resurfacing~|~E68EAE4D78D1A5EF164AEBC076110F7DF4D5BC6E 107294~|~1~|~1~|~01/S<2~|~ROS 28 0.00-0.96~|~05 - 4R Maintenance - Resurfacing~|~D65C2062962EE9A043F85C477386867E0B221D89 107294~|~1~|~2~|~02/STR~|~ROS 28 0.96-6.00~|~05 - 4R Maintenance - Resurfacing~|~B04E2ED65240E0279FCA823899ED0D15A0E53392 107294~|~1~|~3~|~03/STR~|~Bridge pm.~|~47 - Bridge Preventive Maintenance~|~A0F11A4F8380A0A8BAAC6629E2B3FF059C568620 95561~|~1~|~1~|~01/STR~|~HIG 72 0.00-3.98HIG 72 4.56-6.71~|~05 - 4R Maintenance - Resurfacing~|~3EE88E4E241B180F2BBD61E17FB4E4B86EAF023F 91025~|~1~|~1~|~01/IMS~|~Mill & Fill the existing pavement with asphalt concrete on MOT IR 70 15.08 0.61 mile West of IR 75 to SLM 17.34 (Rear abutment of MOT IR 70 17.34).~|~05 - 4R Maintenance - Resurfacing~|~8C549DEF9B641298AE34397033AAE8D95BA8B7D5 100919~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 35 3.80-13.42 and HOC 33 9.43-14.69. NHS route, funds are 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A4D4136FA1E02F5FAFAE7838A0A00D38E67CBD83 100919~|~1~|~3~|~03/NFP~|~Resurfacing of the Gallia US 35 (10-35 & 10-36) rest areas. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~4C8D5EEFDFB9E78DC37140F1E61206FE3357B301 100919~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 850 0.00-5.40. Major rehab funds 80 federal/20 state. Over is preservation funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~926B9076289BB62D55C81F57EBA6CA2DCE8532C0 100919~|~1~|~4~|~04/SAF~|~Recessed wet reflective markings on GAL 850 for 68.27 miles. Safety funded.~|~21 - Safety~|~BF93BCACD773112EE8CFEE5781523102DF29B5A7 118631~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~027DCE1A3BF5A4BE7A2FD2570FCD72E387B5CFD1 96148~|~1~|~1~|~01/NFA~|~New full service facility in Preble County.~|~01 - New Construction~|~E42AD56AEDFFE4A8F066DC5C7C2AC968A9918A6C 82840~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. MOE 7 12.28-21.13 and MOE 536 0.00-0.24. Includes bridge ramps. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F7C4E47B1355EC2FDC2AD00235ED4A3C6130EAA0 105309~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate bridge.~|~13 - Bridge Rehabilitation~|~33B058202B2E04E8828007372FDE383BB0FAB773 105309~|~1~|~2~|~02/STR~|~Bridge repair.~|~13 - Bridge Rehabilitation~|~3E79A0319C21D67472E639A3CB33958518C9C32C 105309~|~1~|~3~|~03/S<2~|~Bridge repair~|~13 - Bridge Rehabilitation~|~1059C54410EAC1B8F946B48807C0AEF0D80C497B 88321~|~1~|~1~|~01/S<2~|~Project involves the upgrade and interconnection of traffic signals at 11 signalized intersections along US-127 and US-35.~|~44 - Other~|~EA834A89F4DD1F45327E891C86040951C8D8EDDA 116835~|~1~|~1~|~01/S>2~|~Improve roadway geometry, stabilize the hillside along edge of road, and provide drainage improvements and other roadway repairs.~|~04 - Reconstruction - No Added Capacity~|~DB71D78DA0C304F9FD2E7C6A87E9F7A7D0BB3409 125231~|~1~|~1~|~01/NHS~|~NHS heat straightening~|~47 - Bridge Preventive Maintenance~|~C6ABFE543523BE12A22C43D13A40EDBFAFAEB910 125231~|~1~|~2~|~02/S5K~|~STP 5,000-49,999 heat straightening ~|~47 - Bridge Preventive Maintenance~|~EFFB79AA136B0DAE37237F39AF844622C7A52FFB 116974~|~1~|~2~|~02/NFP~|~Plan Split for locally funded water line work~|~28 - Facilities for Pedestrians & Bicycles~|~034162A09F49E4B7EB4B7595197AC05CD87CC3FA 116974~|~1~|~1~|~01/MPO~|~Plan Split 1 - Roadway reconstruction work, including road diet with bike lane~|~04 - Reconstruction - No Added Capacity~|~B47B77B102DDD96DFD70CC56A4DDA96C709701B7 87235~|~1~|~1~|~01/S<2~|~This split is for work done using federal urban STP funds. The Group is Bridge as the structure meets the state definition of a bridge. It does not meet the federal definition of a bridge. Therefore, BR funds cannot be used.~|~44 - Other~|~8069C926F196884C62F7640802289CA47753C4D2 87235~|~1~|~2~|~02/NFP/DEF~|~Utilities work added to the project at the request of the City of Defiance. 100% of the funds will be provided by the City of Defiance.~|~44 - Other~|~DC26158647E3D8E78E14C0E01A9FEADD86E52AF7 87399~|~1~|~1~|~01/MPO~|~Project will improve separation of mainline I-71 traffic from the NB exit ramp traffic to Mason-Montgomery Road by extending the ramp gores. Gores will be extended using a physical barrier.~|~21 - Safety~|~C7B078921A6E0F9A1A5E8C9C3BCF9DEFCDDF0361 97660~|~1~|~1~|~01/NFA~|~Resurfacing of HAS-646 from SLM 10.44 to SR 9, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~796C8A839FC4DA05E67F1223629EAC6D57B439B6 103976~|~1~|~1~|~01/ENH~|~Rehabilitation of the Hocking Valley Scenic RR. Federal TAP funds at 80% rate, 15% of TRC and 5% local. Final funding is 95% Federal and 5% Local.~|~22 - Rail/Highway crossing~|~D249A398FCF75BA045FF6E442B9B85C991117D16 107930~|~1~|~1~|~01/ENH~|~Summit MetroParks Freedom Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~D34ECD117108B3B3AAAEAC4166751A1BD9C63547 107930~|~1~|~2~|~02/BRO/AKRO~|~Bridge major preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~5C5780F103FC073C82D616B5E6C656FAFAF99C9E 107930~|~1~|~3~|~03/NFA~|~Steam Utility~|~43 - Utilities~|~E68E0296B7E837900B76DBD950E2FBB520D94EE2 117643~|~1~|~1~|~01/BRF/WCEO~|~Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459)~|~10 - Bridge Replacement~|~0C57CC0C4D580035C02565BA181EED4BECBF1684 109624~|~1~|~1~|~01/STR~|~Resurfacing of SR 331~|~05 - 4R Maintenance - Resurfacing~|~AE730B21496B3401505EE3E56B5C5E46A71CBFE0 104478~|~1~|~1~|~01/NFA~|~Erie Township & Ottawa County~|~05 - 4R Maintenance - Resurfacing~|~BB5FCB19D0FBE83850A3D63BA71F1219575414AD 102853~|~1~|~1~|~01/NFA~|~D09 Bridge Maintenance FY21~|~13 - Bridge Rehabilitation~|~AE9C65FF7C0EC92F2B57885EFE644AEBE72120EF 111576~|~1~|~1~|~01/IMS~|~Slope repair on TRU-IR 80-10.99 (Westbound).~|~~|~B0063A2504ABB74C13ECD7716D8C62AFEB46DFD1 101547~|~1~|~1~|~01/NHS~|~Split for work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~5BF3FF76CC45C2B5F0622BB0DBC0AA7E4601AF7C 101547~|~1~|~2~|~02/SAF~|~Use safety funding to install a curb for a permanent lane channelization for SR-91 SB traffic just south of US-422 EB exit ramp and Bob Evans driveway.~|~21 - Safety~|~1B78056C064FD44B4CB461550C2F88EEED6459AC 101547~|~1~|~3~|~03/NFP~|~100% local participation on work items that are not eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~C4F3AC862661B9B57426CB62201DA38FC2699A4A 97356~|~1~|~1~|~01/NFP~|~Guardrail Maintenance~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~35A807C3BADDE5DAB0ADAC0AEEB18B0A1A81ED91 87139~|~1~|~1~|~01/IMS~|~MAD-70: 8.62-15.57 minor pavment rehab~|~~|~7D3107E777C8E4FB75F2A17926654DAE0BD932F8 87139~|~1~|~2~|~02/IMS~|~MAD-70-12.17L SFN 4902610 Over Little Darby Creek deck sealingMAD-70-12.17R SFN 4902645 Over Little Darby Creek deck sealingMAD-70-12.83 SFN 4902734 under Taylor Blair Rd SRS overlayMAD-70-13.86 SFN 4902769 under Middle Pike Rd SRS overlayMAD-70-15.56L SFN 4902858 Over Big Darby Creek SDC overlayMAD-70-15.56R SFN 4902882 Over Big Darby Creek SDC overlay~|~~|~FC6C6CC1EDDFEC01839D1DB50E2E96BEE4D14431 104833~|~1~|~1~|~01/S>2~|~Convert 4 lane section to 3 lane section in the City of Springfield.~|~04 - Reconstruction - No Added Capacity~|~D46CB5944991DC02B2EAD91983DAACDDB00B2EE2 115699~|~1~|~1~|~01/STR~|~Split for rural STP paving~|~05 - 4R Maintenance - Resurfacing~|~82E75AA650C5D1B43FC366FCA096990901F8DC5A 94791~|~1~|~1~|~01/NFA~|~Install decorative lighting and conduit on both sides of Main Street. Upgrade current sidewalks to include ADA compliance requirements and minor drainage improvements.~|~21 - Safety~|~974D91AF2A8E53F33E5E36A54E2C32B411F856CC 123021~|~1~|~1~|~01/ENH~|~HOCKING VALLEY SCENIC SUBPHASE 1~|~28 - Facilities for Pedestrians & Bicycles~|~8E7AC70F04940C48F72A0183C4C09F954B55171B 122263~|~1~|~1~|~01/STR~|~Safe Routes to School - sidewalks, RRFBs & crosswalks~|~28 - Facilities for Pedestrians & Bicycles~|~41DA6EC1FE129DEDD26555F0001E879071F7E0B2 88222~|~1~|~1~|~01/ENH~|~Replace RW fence with decorative fence, install curbing around existing grass median areal to the West of IR 75 bridge; excavate the painted median East of the bridge and add curbing and topsoil to create a planting area; install curb at the pavement edge immediately adjacent to the bridge area on either side; plan medians and shoulder embankment areas with native trees and brush species on US 36 from Scott Drive to Looney Road. MIA 26 SLM 11.57 to 11.94.~|~31 - Landscaping & Other Scenic Beautification~|~10F81761A34CFA1C03A845798FAA9856907DA471 98865~|~1~|~1~|~01/MPO~|~Resurfacing State Road in the City of New Franklin.~|~05 - 4R Maintenance - Resurfacing~|~E91CFE38E72831946D28F8E645F11FF1E750BD1C 113755~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~~|~78E6058EAFFE84AA5E300C1323A98C149321F03B 123648~|~1~|~1~|~01/IMS~|~Bridges on Interstate~|~47 - Bridge Preventive Maintenance~|~3FFEC1FD6511EAF04151C0DDC34E239C0E8AAC0B 123648~|~1~|~2~|~02/NHS~|~only NHS bridges. BUT-129 ~|~47 - Bridge Preventive Maintenance~|~9FB3D2C1EFBADE2AAB7E9729B549E96AA104F5E3 93576~|~1~|~1~|~01/SAF~|~Signal project in the City of Vermilion~|~21 - Safety~|~27651E5E6F534B49AC8C52D5D7B15DA98EA14F39 93576~|~1~|~2~|~02/SAF~|~100% City of Vermilion Items~|~~|~E22387FA6FF46918D79C6DFF5FA8D9E1B52DB2A8 99704~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark, and Summit Counties.~|~21 - Safety~|~5B680E89B2515F1A3AEA8F58A742257D801516F4 101707~|~1~|~1~|~01/S>2~|~Resurfacing of Salt Springs Rd from Elsworth-Bailey Rd to SR 45, South Leavitt Rd from Palmyra to Hewitt-Gifford Rd both routes in the Village of Lordstown, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~0914E6C55FC1068F8D77EF9454C8526826CAC16C 92792~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing with asphalt concrete MOT US 35 SLM 15.07 (IR 75) to SLM 18.57 (Livingston Avenue).~|~05 - 4R Maintenance - Resurfacing~|~DCD59BD789DF6B497F5FAF1497481A4A8DDC5FD8 76462~|~1~|~1~|~01/NHS~|~SLM 0.00 to 5.21 Pavement repairs. SLM 5.21 to 12.92 pavement minor rehab excluding SLM 5.21 to 5.7801/NHS/PV/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C943800887948A65DBE913DAA7244DF8D47C491 76462~|~1~|~2~|~02/NHS~|~Bridge rehab - SRS overlay on 9 structures:6500668 PIC US23 7.98 Intersect: Over NS RR6500692 PIC US23 7.98 Intersect: Over NS RR6500722 PIC US23 8.76 Intersect: Over US 22-17266500757 PIC US23 8.98 Intersect: Hargus Creek6500781 PIC US23 8.98 Intersect: Hargus Creek6500870 PIC US23 10.38 Intersect: Over CSX RR(Old C&O)6500900 PIC US23 10.38 Intersect: Over CSX RR(Old C&O)6500935 PIC US23 11.7 Intersect: Griffys Run6500994 PIC US23 11.7 Intersect: Griffys RunNot BR eligible02/NHS/BR/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2B656DEF2BE4D99FD81D608A37784D4DB44C52D1 76462~|~2~|~3~|~03/SAF~|~Part 2-realign left turn lanes at Dupont Rd/Pittsburgh Rd, reconstruct signal and mill & fill from SLM 5.21 to 5.78~|~21 - Safety~|~9E60EC9087CC629D2B1B1DD698DC18F992A8C0B3 86973~|~1~|~1~|~01/ENH~|~Enhancement of the Indian Ripple Road & I-675 interchange area through the planting of shade trees, evergreens, and perennial flowers. Additionally, the project involves some minor grading work and the installation of decorative retaining walls to provide suitable planting beds. The location and size of all plantings and retaining walls shall comply with ODOT's landscaping guidelines.~|~31 - Landscaping & Other Scenic Beautification~|~2C0B038DC368FF60A8629651F4FDB7D59F0D8ADD 106773~|~1~|~1~|~01/NHS~|~Split for highway lighting replacement and guardrail repair; 95% federal 5% local.~|~21 - Safety~|~B1CED56E795D8D582D2526F9569B93B354582CE9 122074~|~1~|~1~|~01/ERD/MASS~|~Corridor improvement.~|~04 - Reconstruction - No Added Capacity~|~BAEFC93EDB60DD311FA4AF82292D012D174C4F88 100909~|~1~|~1~|~01/NHS~|~This split is for culvert work on NHS route.~|~04 - Reconstruction - No Added Capacity~|~D82C3A3CF7505FA9328A304A9ED581BD69F97722 100909~|~1~|~2~|~02/IMS~|~This plan split is for culvert work on Interstate Route.~|~04 - Reconstruction - No Added Capacity~|~21FD634C40CE49FAE0A64CC1E18606277F19957D 100909~|~1~|~3~|~03/STR~|~This plan split is for culvert work on Rural Routes.~|~04 - Reconstruction - No Added Capacity~|~C60E1DE5D7C49CF46A977AA92ABB61900482CF69 100909~|~1~|~4~|~04/NFA~|~This plan split is for culvert work on Non-Federal Routes.~|~04 - Reconstruction - No Added Capacity~|~0691B4A2E2B1BBA1218BA4131A7E95807B58FE13 102888~|~1~|~1~|~01/NFA~|~BRO 763 0.65~|~04 - Reconstruction - No Added Capacity~|~E2E3E29E138344905E4CAE6C2C5B63101A528ED5 117563~|~1~|~1~|~01/SAF~|~Construction of a roundabout at the intersection of Trebein Road, Dayton-Xenia Road, and Hilltop Road.~|~21 - Safety~|~1AF87E35AF27996F186DBD629D52BBDEC67814D1 110365~|~1~|~1~|~01/NFA~|~Resurface with 2" asphalt concrete the Bloody Bridge parking lot at SR 66 and CR 182.~|~05 - 4R Maintenance - Resurfacing~|~125DEEF1A8B4C470E4D8682E4E28EEFF330DB960 118669~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11.~|~21 - Safety~|~4645317A1F2FC547B0E2E37FA8A933E2C8557D1E 113721~|~1~|~1~|~01/SAF~|~Install a NB right turn lane on SR-741 at Remick Blvd, install new signal with backplates and retime the signal.~|~21 - Safety~|~ECE6776EEFDE90ECC86E97D4050D223920FAE0BC 95715~|~1~|~1~|~01/NFP~|~Replacement of drainage system along the West side of State Route 46 from slm 16.09 to slm 16.32, Austintown Township, Mahoning County, Ohio.~|~~|~1B294982EB7973853ECC6680C696D5B98EB47A8E 110683~|~1~|~1~|~01/NFP~|~All work included in this split using district preservation allocations.~|~~|~AB349B8B6DC5801F5D9E99B08473DA10F2719CEE 125171~|~1~|~1~|~01/S5K~|~Urban paving~|~05 - 4R Maintenance - Resurfacing~|~D2B980852CC248675DBD375A83DB0A2C8EC80416 104578~|~1~|~1~|~01/ENH/ROSE~|~Village of Roseville Transportation Alternative (Enhancement) Funds - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of concrete sidewalks and curbs along North Main Street; 1st Street; 2nd Street; 3rd Street; Chaney Street and Zanesville Road in the Village of Roseville~|~28 - Facilities for Pedestrians & Bicycles~|~5EDB30BE9B6AAD4DA4C462A259B5A7997C733D70 93817~|~1~|~1~|~01/STR~|~Resurfacing of Cleveland Massillon Road (CR-17) in Bath Township from Ghent Road to Ira Road. SLM 17.32 to SLM 19.83. Includes shoulder improvements, partial and full depth repairs, catch basin repairs, guardrail upgrade.~|~05 - 4R Maintenance - Resurfacing~|~5408CDDBB81DB30F89199CF9F6ED0B70D901A879 87691~|~1~|~1~|~01/STR~|~Bridge Repair: CRA-19-6.13 (SFN 1700464), CRA-19-6.22 (SFN 1700472), MED-252-2.73 (SFN 5206804)~|~13 - Bridge Rehabilitation~|~74533A5936CF641C8CA11361CE22767A6FE4E662 87691~|~1~|~2~|~02/NHS~|~Bridge Repair: WAY-30-21.26 (SFN 8502285)~|~13 - Bridge Rehabilitation~|~D6C65B4F110B2F9BD49114682D2289B0D943DB7E 94723~|~1~|~2~|~02/SAF~|~100% Safety funding for ramp capacity and arterial improvements.~|~21 - Safety~|~ADBE5460EBD4669B9531DFB7A4D0F4207DA8C015 94723~|~1~|~1~|~01/IMS~|~90/10 Federal/State funding split for all work replacing existing ramp pavement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CD6FEABC1E6660938BDBCA5E544960B9945D6E92 101850~|~1~|~1~|~01/S<2~|~1) rebuild deck edges 2) remove existing (2005) 1" - 1 1/2" asphalt wearing surface 3) remove exisitng (1982) 1 1/4" latex modified concrete wearing surface 4) place new SDC overlay using hydrodemolition 5) reface abtument walls with anodes while catching deck floor spalling at abutments 6) encase pier columns 7) patch pier caps 8) rebuild wingwalls 9) design expansion joint system (possible Poly-Mod).~|~~|~F78B76385AC42CEA47D3D4D1163EBE472BF66A2E 92115~|~1~|~1~|~01/IMS~|~resurface LUC IR 475 9.92-14.53 - I-475/US-23 split to Douglas Rd~|~05 - 4R Maintenance - Resurfacing~|~76DCF097FA89BDCF15FA17D4847C4C7764070DBB 82796~|~1~|~1~|~01/CMQ~|~80/20 fed/local funding split using federal CMAQ funds.~|~24 - Traffic Management Engineering - HOV~|~1E5D3C0981E30CB17E7FEDB290370E0F5CF860DA 82796~|~1~|~2~|~02/NFP~|~100% Local participation for work that is not eligible for federal funds.~|~24 - Traffic Management Engineering - HOV~|~30935F7A73FB002F2AF6F6685F022F1AF4B33558 113751~|~1~|~1~|~01/SAF~|~For pavement markings on the Interstate system in Allen and Hancock counties. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal.~|~~|~736C4FCEC2D1E39D78907A815D59522080B6E742 113751~|~1~|~2~|~02/SAF~|~For pavement markings on the NHS on US 68 in Hancock County and US 23 in Wyandot County. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal.~|~~|~5D12CD9DE9F17C11DADE87ECC8B33F2C38026078 96793~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Gallia County. CEAO funded. Funded 100% federal.~|~21 - Safety~|~35786935BCE71082C2BA798D7D7D15FE6AE3D1EA 98217~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% federal funds.~|~28 - Facilities for Pedestrians & Bicycles~|~8C59649C239E0155B644DDB858F2472743D70FB5 99008~|~1~|~1~|~01/STR~|~Raise and stabilize the north approach slab of DAR-185-8.20 (SFN 1902903) over the Stillwater River.~|~13 - Bridge Rehabilitation~|~EA3B45417C78320D3B804CD42DA783807A5996D8 100627~|~1~|~1~|~01/S>2~|~plan split for pavement work in the large urban sections:CLE-132: SLM 10.80-16.19~|~05 - 4R Maintenance - Resurfacing~|~D7D5E59CCC3B352AE7DFCC99B7ED29072A9A2743 100627~|~1~|~2~|~02/STR~|~plan split for pavement work in the rural section:CLE-132: SLM 17.32-18.73~|~05 - 4R Maintenance - Resurfacing~|~F8DBF228E8CDA3FD22CF113C20C05475F31D7410 100627~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~4B8BD421D4AF76CCED87C73575F629C00DCA1688 94410~|~1~|~1~|~01/S<2~|~From SLM 7.07 to SLM 12.32. It was decided not to chanrge the local the 20% match.~|~05 - 4R Maintenance - Resurfacing~|~B602372F9EDFB4A81500EF055D83465AA4A76621 94410~|~1~|~2~|~02/BRO~|~Approach slab of the Mamascus bridge.~|~47 - Bridge Preventive Maintenance~|~F314CA514985F60D79C33F025527F408FA7F5A1C 111366~|~1~|~2~|~02/S>2~|~Split 2 for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~865B5A8BC8F34304ECC23D9A212E715B0A5D1E32 111366~|~1~|~1~|~01/MPO~|~Split for intersection improvement/pedestrian safety work.~|~05 - 4R Maintenance - Resurfacing~|~69BF089F03F419E2C6251D1F01A64BAA7C278158 111366~|~1~|~3~|~03/NFP~|~Plan split for non-eligible items.~|~05 - 4R Maintenance - Resurfacing~|~F16B4EF77E93306F3929208D443B08D98E3A0E7F 121875~|~1~|~1~|~01/STR~|~slide repair near Fernald Hill on BUT SR 126 - rural section near SLM 9.5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB07FCE557886624AB0F7EAA9605F2677B6EBB8B 124748~|~1~|~1~|~01/SAF~|~Paint Creek Recreational Trail Rehab.~|~28 - Facilities for Pedestrians & Bicycles~|~6E9CB716EB3FEC3DF0C286D48D562E2C68840369 112726~|~1~|~1~|~01/S>2~|~Replace culvert at DEL-42-12.97~|~10 - Bridge Replacement~|~5E64128CE7D88A8E96D7EEFE7470F3F46312E2C3 96554~|~1~|~3~|~03/S>2/CANF~|~Widening portion of US-62 from Dartmouth (SLM 9.13) to Sleepy Hollow Drive (SLM 9.25), in the City of Canfield, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~3A1B91592635093C22EB86BAD59CC494F45A52F9 96554~|~1~|~1~|~01/S>2/CANF~|~Resurfacing of US 62 from SLM 9.13 to SLM 9.67. In the City of Canfield, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~34228775BD552728BF9EC6F74867E99F7D885CA5 96554~|~1~|~2~|~02/MPO/CANF~|~Major Rehabilitation, including new curb and drainage along US62 from Darmouth (SLM 9.13) to SLM 9.67, in the City of Canfield, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~2213F97C1EE7E58C7AC2C9DBE97A97CF24A1E9BB 97300~|~1~|~1~|~01/NFP~|~Plan split for all work on the interstate system~|~44 - Other~|~254F204BC83964EE20ACCEC280122D323D825FA3 94243~|~1~|~1~|~01/NFA/HAS~|~"01/NFA/PV/HAS" - Jobs and Commerce funding eligible for any project work~|~04 - Reconstruction - No Added Capacity~|~C8B4A551BF16D2AA9A2DDEED7C8472A06D86E5C3 111099~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7 (100% State) - No CAP - Replacement of the Superstructure on SFN 4506723~|~13 - Bridge Rehabilitation~|~EB29047A6416B2C2992668D8BED3B2781D71D414 125705~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~0BCE32975A146C11B375CA3A5DB2596EA1724402 98478~|~1~|~1~|~01/STR~|~MED-83-0.94-12.77 Micro~|~05 - 4R Maintenance - Resurfacing~|~FFEB9BA0F63414333B7B139E0EE15BB744ABC3FC 98478~|~1~|~2~|~02/STR~|~Bridge work not determined.~|~13 - Bridge Rehabilitation~|~D6AEFA8D517382FD3268B8147A2E4676F4F451F1 105145~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6532621C04B0F21BD4BDE5BB0C0ED1D05286024E 105145~|~1~|~2~|~02/NHS~|~Reconstruction, adding northbound left turn lane on US 62 at Franklin Ave and adding a U-turn area for trucks at Hibler Lane includes culvert replacements and drainage work.~|~04 - Reconstruction - No Added Capacity~|~4D2AAAC7EA018A5D7770F898EA904EFB6B2FE1E1 105145~|~1~|~3~|~03/IMS~|~Full depth repairs and drainage work.~|~04 - Reconstruction - No Added Capacity~|~99F58299398815DE08387F6A0D35BBFDB08E1160 123298~|~1~|~1~|~01/SAF/JEF~|~Guardrail upgrades utilizing CEAO HSIP (4HB7) funding at 100%.~|~21 - Safety~|~F41475696358AFC310DCA55D263069FD5ACDEA56 118059~|~1~|~2~|~02/MPO~|~Plan Split for roadway resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D976120B827882239C0B2B56475566C1DA488F81 118059~|~1~|~1~|~01/MPO~|~Plan split for roundabout construction. Varying classifications are all within influence of intersection improvement.~|~21 - Safety~|~2EE2D6FEAC1BDA5D4B6B5C41A77E20F07A6C61C3 96758~|~1~|~1~|~01/NFP~|~One year (FY 2015) contract for mowing of interstates and interstate look-a-likes in POR, STA and SUM Counties.~|~~|~A2A6B97417534A305051993024DD24BD7A81B5C9 100329~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code~|~21 - Safety~|~F63DA3D1C8C8054A52E3B851D129B9458E469993 99618~|~1~|~2~|~02/STR~|~See linked culverts.~|~04 - Reconstruction - No Added Capacity~|~EAE5331C9F563B3A8540A0421FD5CDCE45C4A882 99618~|~1~|~3~|~03/STR~|~New 10' structure replacing culvert at SLM 11.86.~|~04 - Reconstruction - No Added Capacity~|~22D44F1B5027A2C9157690D04EBCDDAD054442E1 99618~|~1~|~1~|~01/S<2~|~Minor bridge work to structure >20' span.~|~47 - Bridge Preventive Maintenance~|~DA935C582B2D670CA4B80289345C66057AD86722 115328~|~1~|~1~|~01/NFA~|~Bridge replacement project on NOB CR 47 3.49 (SFN 6130593). Work includes intersection reconstruction and drainage improvement.~|~10 - Bridge Replacement~|~DCA3BAF1A21EF586C6A5AB08EA2DDED7CF5E3E02 112492~|~1~|~1~|~01/STR~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~E69CF0D6C4BCDA6D7A83CEAB358164F027557981 104681~|~1~|~1~|~01/NFP~|~ADA VAR CR PM~|~21 - Safety~|~52E7B3CC0BD80F03B0D90EF2254C62FB82BBF704 87701~|~1~|~1~|~01/NHS~|~District Allocation~|~99 - State Preventative Maintenance~|~1560245F2467C3D7989E78594F3096A4E30E8B19 107270~|~1~|~1~|~01/NFP~|~All work is included in this split.~|~13 - Bridge Rehabilitation~|~0F0B132479E7E309E96AA9ECF86D72A982EB915B 107963~|~1~|~1~|~01/ENH~|~Relocation of POR Hike and Bike Trail onto railroad bridge.~|~~|~5331EBBC40E2843C97151821141654F7EEEFFF1B 102524~|~1~|~1~|~01/STR~|~Chip Seal on:PRE-732BUT-177~|~05 - 4R Maintenance - Resurfacing~|~816CEE4B21EB5D2DB392BB9882F0D4E2FF073ADB 95523~|~1~|~1~|~01/S<2~|~Paint bridge superstructure and seal concrete surfaces with epoxy urethane. Bridge # CLA-235-0395, SFN 1205765.~|~13 - Bridge Rehabilitation~|~E04FCD5AB542F6EDFACD47B8CCB7B207CF1CB0A9 113548~|~1~|~1~|~01/IMS~|~Split for bridge painting on the interstate~|~47 - Bridge Preventive Maintenance~|~7B0AD39BF81E1513F159743C63756E81989B4CAB 121292~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EA4D5767A0810ABFDF71935BE4FCCCCB5BB73730 112182~|~1~|~1~|~01/NHS~|~Minor bridge rehab > 20' span.~|~~|~BAD86C0E494CEADCD80E009C53ECA92A4298B2A9 110938~|~1~|~1~|~01/S>2~|~Split for resurfacing work~|~~|~3B05AACAFE1D99A3634520B986D50E7916B5A8FE 84625~|~1~|~2~|~02/IMS~|~Minor bridge work >20' span.~|~47 - Bridge Preventive Maintenance~|~C25A0B41B86AE87C545703B81F6B231D712F2F2A 84625~|~1~|~3~|~03/NHS~|~Minor bridge work >20' span.~|~47 - Bridge Preventive Maintenance~|~0AEBBD19CCA44731A5A2F24DB6AEEEB6989A8DA0 84625~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E1DCF21964978CFD9764461F8FF0D736FB59F472 84625~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span and culvert.~|~04 - Reconstruction - No Added Capacity~|~BB0D14C8A44A6FE0F060FFBE56ACE79539FF0C1F 84625~|~1~|~5~|~05/S5K~|~Ashtabula lift bridge, replacing existing rivets with new bolts at vertical connections on panel points.~|~47 - Bridge Preventive Maintenance~|~AFDD6B2FC46E40ED824A1641AA1FE2D32348C617 84625~|~1~|~6~|~06/NHS~|~Catch basin reconstruction/replacements and culvert clean out on SR 11 between I-90 and SR 531. ~|~04 - Reconstruction - No Added Capacity~|~4893A5B740423422629988C46DB21514A847822C 86044~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1805460; CUY-071-1829~|~13 - Bridge Rehabilitation~|~FDCA0E7EB602A945A7E1BFF64D79C38F65CB0064 124629~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to install and upgrade guardrail on various county roads.~|~21 - Safety~|~3279604BE4B51F8F3F7A63122E4BFD3885FF8DCB 75890~|~1~|~4~|~04/STR~|~Rehab several bridge size culverts on HAM-128 including scour protection. R/W is possible. Remove abandoned structure at HAM-128-0296. This Plan Split is for the Rural portion of the bridge work. The bridges included in the Rural portion are:HAM SR128 0060; SFN: 3104206 and intersects: Trib Great Miami RiverHAM SR128 0217; SFN: 3104230 and intersects: Trib Great Miami RiverHAM SR128 0296; SFN: 3104265 and intersects: Trib Great Miami RiverHAM SR128 0423; SFN: 3104354 and intersects: Trib Great Miami RiverHAM SR128 0638; SFN: 3104478 and intersects: Trib Great Miami RiverHAM SR128 0888; SFN: 3104508 and intersects: Trib Great Miami River~|~13 - Bridge Rehabilitation~|~17021370BA86972B170892DA98EE5B82BFF56712 75890~|~1~|~6~|~06/S>2~|~Funding split for costst associated with bridges HAM-128-0423 and HAM-128-0683.~|~13 - Bridge Rehabilitation~|~465F75E973130A1BFFA18C524C9F374E375A932E 75890~|~1~|~5~|~05/STR~|~This plan split includes Village of Cleves Waterworks' watermain relocation near the Village of Cleves.~|~05 - 4R Maintenance - Resurfacing~|~5878937520968B8DEF1927412A928472EBDED5A2 75890~|~1~|~2~|~02/STR~|~Plane and pave portion of SR 128 in Hamilton County from the intersection with US 50 to the I-74 interchange. This Plan Split is for the Access Management Issues is also included in this Plan Split.~|~05 - 4R Maintenance - Resurfacing~|~6F5765463B71362439A58179F26CD0673E4FEBF3 75890~|~1~|~8~|~08/S>2~|~Funding split for all costs associated with bridge HAM-128-0296.~|~13 - Bridge Rehabilitation~|~72887879C1EDE2A28D5D728E2876AF51A3825106 75890~|~1~|~3~|~03/STR~|~Plans split for repair of slides including items related to the construction of the retaining walls, embankment reconstruction, roadway base reconstruction, and barrier replacement. This plan split uses Geologic Site Management (GSM) funds which are capped at $300,000 and District Preservation funds (4ps7/4pf7) which will fund the balance of the slide repair work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CDD7D2B0906905057560DA805E0F259200E31C98 75890~|~1~|~1~|~01/STR~|~Plane and pave portion of SR 128 in Hamilton County from the intersection with US 50 to the I-74 interchange. This Plan Split is for the Rural portion of the pavement from SLM 0 to 4.93. The Plan Split also includes the guardrail upgrade to MGS.~|~05 - 4R Maintenance - Resurfacing~|~D51EED3CBE2CFCE7B66720FBFE2F28A4CF2E4AD4 75890~|~1~|~7~|~07/STR~|~Funding split for all costs assotiated with bridge HAM-128-0217.~|~13 - Bridge Rehabilitation~|~F1150DE66D3F828C739136325F873F74A5750E9A 124515~|~1~|~1~|~01/STR~|~stp rural~|~04 - Reconstruction - No Added Capacity~|~4317BE48D73399042A61B3EB0C3D5223C87D872D 122137~|~1~|~1~|~01/BRF~|~Bridge (2930331) to be replaced along CR 69 over Ceasar Creek~|~10 - Bridge Replacement~|~33D8C02544AEB2F54A9E87A86DA4FCC2D49881BB 112583~|~1~|~1~|~01/MPO/TWIN~|~Resurfacing of Ravenna Rd from E Idlewood Dr to Chamberlin Rd in the City of Twinsburg.~|~05 - 4R Maintenance - Resurfacing~|~8A69FE2BFE27508F1F93EFD37BB42DD9D643BC3C 88679~|~1~|~1~|~01/IMS~|~plan split for all roadway work ~|~05 - 4R Maintenance - Resurfacing~|~C9FA768F57F0394CFE9A392952C6DB863F4B7022 88679~|~1~|~2~|~02/IMS~|~plan split for all work associated with bridges~|~13 - Bridge Rehabilitation~|~B28C90ECC6919B18E77AAC47DC6CD14A4685848B 89277~|~1~|~1~|~01/S>2~|~80/20 state/local split for all Urban Paving eligible work.~|~05 - 4R Maintenance - Resurfacing~|~3A70DF2248664BDEC6842F68EBC4924B248AADC2 89277~|~1~|~2~|~02/S>2~|~100% local participation items of work such as curb ramps, etc.~|~17 - Construction Engineering~|~596B4A925ED3EE634D2414C5DC23CFF2CA100C36 125955~|~1~|~1~|~01/S>2~|~Plan split for preventative pavement maintenance work on General system~|~05 - 4R Maintenance - Resurfacing~|~098A9B216042AECE8729CE407F79FD8249EE04C5 126029~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~FA4F0140DCCD3B8956720C111419BF2C19FF25D1 115665~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 143 0.21-0.778.~|~05 - 4R Maintenance - Resurfacing~|~3ACF4EEAFC1557C9E723BBDFBF8EB7596ABB3341 115665~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 681 7.24-10.49, MEG 681 0.00-4.78, 17.50-21.17.~|~05 - 4R Maintenance - Resurfacing~|~3F7E53CE86F50B2E4AB0DF2D999F025A18740FE3 92069~|~1~|~2~|~02/NHS~|~Split for work on drainage structures under interstate freeway look-a-likes that do not meet federal bridge definition.~|~13 - Bridge Rehabilitation~|~735AAE5905D2BFA67DCBD88583B0DC4E58CDB114 92069~|~1~|~1~|~01/IMS~|~Split for drainage structure repair under the interstate that do not meet federal bridge definition.~|~13 - Bridge Rehabilitation~|~F3F5D47A7D53BBD7242BE0B90B1D46F1CB68AE71 93805~|~1~|~1~|~01/MPO~|~Resurfacing of Fairchild Avenue (CR-140) from Majors Lane to Hudson Road.~|~05 - 4R Maintenance - Resurfacing~|~3DEC1DCF8D138543CC17D90939B85E039DB4DE2C 118186~|~1~|~1~|~01/SAF~|~Plan split for roundabout construction~|~21 - Safety~|~401DFD388CE11BFCA80DC87A6FFD6D3CDD30E7D9 112485~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~F015137A53E312BCC688F8F11DEF3CB9B6D72136 104257~|~1~|~1~|~01/NFA~|~MOWING~|~44 - Other~|~3A983D87E49561CB204F5E777A879F3E907EE216 100989~|~1~|~1~|~01/STR~|~DSR# BEL-012~|~04 - Reconstruction - No Added Capacity~|~F18CB099E1A186A7BABBB84C3D82A8159DD3DED9 96828~|~1~|~2~|~02/NFA~|~Non Transportation Alternative Program construction costs. Village of Tuscarawas responsibility with OPWC, ARC, local funds.~|~28 - Facilities for Pedestrians & Bicycles~|~28A4F7EFC8B5BCBD6AAC66E17752A4A39893605B 96828~|~1~|~1~|~01/ENH~|~Eligible Transportation Alternative Program construction costs 80% 4B37 (TAP) and 20% LNTP (Local).~|~28 - Facilities for Pedestrians & Bicycles~|~CAAD2B40C6FBBC5BBCD46B042AF97B93069652F1 109117~|~1~|~1~|~01/SAF~|~Work to improve the pedestrian safety around the Brooklyn Elementary School that is eligible for federal-aid~|~21 - Safety~|~300FCD2D612DC3205FFC1CDC13ABC398B858F3D9 119251~|~1~|~2~|~02/STR~|~All work associated with DEL-37-6.91 to 6.92, DEL-521-3.14 to 7.28 and MRW-656.~|~05 - 4R Maintenance - Resurfacing~|~DC5DC6ED7A3731545AE7176CE39A43665F634BAD 119251~|~1~|~3~|~03/S>2~|~Urban Paving Plan Split - City of Delaware~|~05 - 4R Maintenance - Resurfacing~|~E8E490888850C310D2412679F612088BF5C83A06 119251~|~1~|~4~|~04/S>2~|~Urban Paving Segment - City of Delaware costs at 100%~|~05 - 4R Maintenance - Resurfacing~|~36511D899FA2144D2F9C455039FC8245B923B12C 119251~|~1~|~1~|~01/S>2~|~All items of work on DEL-37-6.92 to 7.53, 8.65 to 8.68, DEL-3, DEL-203 and DEL-521-2.65 to 3.14~|~05 - 4R Maintenance - Resurfacing~|~0324F7CC80A99E5FBF71139AAE5A206A7DA93384 126998~|~1~|~1~|~01/NFA~|~Created For ODOT TID Involvement. ~|~44 - Other~|~24FDD9BB3D41EDD9EED3B347B7891B0224177797 107370~|~1~|~1~|~01/NFP~|~Restriping along various routes within D5.~|~21 - Safety~|~A96A0E17C64251BE36459B7A1E6E40B4D6B475A2 90248~|~1~|~1~|~01/ENH~|~Enhancement funding to rehab historic Strend Rd structure over Big Darby CreekSFN 8031401 UNI-CR67-0.77 Big Darby~|~13 - Bridge Rehabilitation~|~18E13EF14E59A79508AEAF0B9C42617E0DB4136B 95140~|~1~|~1~|~01/NFA~|~Install new and upgrade existing guardrail on various locations in Auglaize County. Auglaize County Guardrail Project on non-federal air routes. CEAO funding at 100%.~|~21 - Safety~|~E7F678A9C4557BA8A3EABAE46FD515F9C5C8CD49 95529~|~1~|~1~|~01/STR~|~SR772 SLM 13.41 to SLM 23.88 Resurfacing ProjectBegin at SR124 to Ross Co line it is proposed to resurface the highway and perform any needed repairs. 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~0B64F4409AB673D64D7059783C8E159E4D25329A 95529~|~1~|~2~|~02/S<2~|~SR335 SLM 24.78 to SLM 26.06 Resurfacing ProjectOn SR335 in Waverly Corp it is proposed to resurface the highway and perform any needed repairs. 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~3E0FEE229CBAA2F644B2138274F2FC623609C4E4 102982~|~1~|~1~|~01/NHS~|~This plan split is for the NHS routes.~|~05 - 4R Maintenance - Resurfacing~|~0B55EF7B9DC4AB5E2B97E0A96B166EFA69B684FF 112408~|~1~|~1~|~01/NHS~|~AC overlay with repairs on: CLE-125 SLM 5.13 to 5.33 CLE-125 SLM 5.33 to 6.92 CLE-125 SLM 6.92 to 7.11 CLE-125 SLM 7.11 to 7.37 CLE-125 SLM 7.37 to 8.95~|~05 - 4R Maintenance - Resurfacing~|~470DC5FCDA2B1B9264132AA9E493690ABA7FE8C3 112408~|~1~|~2~|~02/NHS~|~Culvert work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE8BB7D44A7FF414115405D785E6E975CD2EB8C6 112408~|~1~|~3~|~03/NHS~|~Rehabilitate the CLE-125-0594 structure as follows: 1. Tuck point the masonry and patch the concrete in the intermediate junction chambers. I believe there are 3 of them. 2019 inspection photos: J:\structures\bridges\19 photos\CLE\SR125\0594 2. Replace the guardrail on the north (outlet) end that complies with current standards.~|~05 - 4R Maintenance - Resurfacing~|~DD440D38114B1D8721DCCDA300F8CF50BB00515C 112408~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~04B202651DD5827B77B8C9DF94B8784F4E85596A 110733~|~1~|~1~|~01/NFP~|~Construction inspection.~|~17 - Construction Engineering~|~1FAA545AC99F6F5502C0A6484D77BB8BE6D41FDF 118911~|~1~|~1~|~01/NFP~|~Guardrail replacement and maintenance~|~21 - Safety~|~0CEBCD0B4968AE686519B1823030D0A43C53EC7C 123656~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. ~|~47 - Bridge Preventive Maintenance~|~BFAF85B8E35AEAA27DEECC915A12FFEA81BC5822 100421~|~1~|~1~|~01/SAF~|~Intersection, Safety Project~|~21 - Safety~|~75F3B598F1DDD990933F9A10EF56711A8F7CBDA5 100421~|~1~|~2~|~02/NHS/HUR~|~Urban Paving slm 17.49 to 19.34.~|~05 - 4R Maintenance - Resurfacing~|~0FAB4C2614F7A34811275B1AE92C2741F24599BE 100421~|~1~|~3~|~03/NHS/HUR~|~100% City of Huron Items.~|~05 - 4R Maintenance - Resurfacing~|~56A22A16BF39CB3E6DA381FC6AFB16D0D8E7D017 100421~|~1~|~4~|~04/BRO/HUR~|~Bridge Work for Urban Paving 17.49 to 19.34 80% fed / 20% state.~|~13 - Bridge Rehabilitation~|~FA8EFD01D42D55872EAF587B496ED7216A22A2E3 80969~|~1~|~1~|~01/ERD~|~Federal earmark funding for all work.~|~44 - Other~|~3F56CC252FF8EBC306EEEF5460E0390984035968 105832~|~1~|~1~|~01/STR~|~Slide Repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A1418B53E7680BB5F3C5F78FB8E1243FE1BD83E8 104921~|~1~|~1~|~01/IMS~|~Bridge Split~|~47 - Bridge Preventive Maintenance~|~388B2B23D7319C24BF64F192581E9BB979BE2391 104921~|~1~|~2~|~02/IMS~|~Plans split for roadway barrier sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F25E996EF504A8BBF203231BD2C327A4F827C281 94786~|~1~|~1~|~01/S<2~|~Field pave invert of existing CMP structure. Structure is only 17 feet in length. SFN 0601020 AUG 66 1076 over unnamed ditch.~|~44 - Other~|~2DF925D4BA50B169B2BBACF6AA7B7AF9693A10EA 94786~|~1~|~2~|~02/STR~|~Field pave invert of existing CMP structure on SFN 0601292 AUG 66 2129 over Miami & Erie Canal.~|~44 - Other~|~4D738DAAAB4E924495CB7578381EF10AA59A3A78 114291~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8.~|~21 - Safety~|~423B667C0FE3E6A5BA0960A7C32F38B71C229809 114291~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7.~|~21 - Safety~|~280D60AC6C233C76483C67F7921BB83ACB3E234F 83661~|~1~|~2~|~02/ENH~|~Rehabilitate existing covered bridge. Vertical and diagonal members, floor system and roof will be replaced. Install improved lighting and surveillance system. SFN 1359975~|~13 - Bridge Rehabilitation~|~58794406CA8A0AD0E9070A4EA915A5265EBE760E 83661~|~1~|~1~|~01/ERD~|~Rehabilitate existing covered bridge. Vertical and diagonal members, floor system and roof will be replaced. Install improved lighting and surveillance system. SFN 1359975~|~13 - Bridge Rehabilitation~|~E047C9DB38119CA1E0899ED94DFBFD35A663440E 116337~|~1~|~1~|~01/S>2~|~Resurfacing on WAR-22 for the large urban sections~|~05 - 4R Maintenance - Resurfacing~|~F6F30CFAA86D08B5FABE37D6BFC76D03BCCA31FB 116337~|~1~|~2~|~02/S>2~|~TSMO work to widen US-22.~|~03 - Reconstruction - Added Capacity~|~49617E09E2E6B7D78AD3A52B353D52553903503B 116337~|~1~|~3~|~03/S>2~|~Culvert rehabilitation work not tied to widening/extending culverts for TSMO portion of scope. ~|~04 - Reconstruction - No Added Capacity~|~F531E99D367891997AD55E81FF326DE643CE6777 98856~|~1~|~1~|~01/NHS~|~Replace RoW fence in various locations.~|~44 - Other~|~CB84590DF15FEE7DE55AB67707BC387EA26764CC 100934~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete SR 117 and a portion of SR 245 in Logan County: LOG SR 117 SLM 5.83 to 6.85 LOG SR 245 SLM 1.76 to 2.11~|~05 - 4R Maintenance - Resurfacing~|~52ABB3F122009D801EA13D67560F492428A5755D 100934~|~1~|~2~|~02/NFA~|~Overlay with asphalt concrete a portion of SR 245 in Logan County: LOG SR 245 SLM 0.87 to 1.76~|~05 - 4R Maintenance - Resurfacing~|~4C4A8D0EF909E42C984AB72CA3C8B37DA0928243 113796~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" - replacement of MUS TR 274 0.10 (SFN 6037674) structure.~|~10 - Bridge Replacement~|~BD81EAA5561B291C1E75F2C0BCD6EAA2C2360230 107181~|~1~|~1~|~01/SAF~|~Pavement Marking project on various County Roads using 100% 4HB7 CEAO Safety funds.~|~21 - Safety~|~F967101A636DCCE67755D0406AD24124EF9EF00E 116494~|~1~|~1~|~01/S>2~|~Culvert replacement~|~05 - 4R Maintenance - Resurfacing~|~48BEE20E484BD9CA941E1C254FE65A5AA1DBAE65 116494~|~1~|~2~|~02/STR~|~Culvert replacement & resurfacing~|~05 - 4R Maintenance - Resurfacing~|~17BA0DDAB2016B55078E5CA84F5616D7A483FA21 87164~|~1~|~1~|~01/STR~|~Split includes Rehabilitation of bridge bridges PRE-177-0667 over Four Mile Creek and bridges PRE-177-0922 over Fleisch Run and all associated approach roadway work.~|~13 - Bridge Rehabilitation~|~CBE8E48357D9D65D16C8171E42DAEB9E6D98797B 96346~|~1~|~1~|~01/SAF~|~Realigning and reconfiguring the intersections of US-62, Middlebranch, Harrisburg, and 30th Street in Plain Township, Stark County, Ohio. Project includes the construction of a roundabout at Harrisburg and 30th Street.~|~21 - Safety~|~D8CAC387ACA9230A4406ACFD6857D2BBC1070825 96346~|~1~|~2~|~02/SAF/CANT~|~Reconstruction of City of Canton waterline along US-62.~|~43 - Utilities~|~17DACCE5CCE239BD0847920BC1B17673372F0F7B 124508~|~1~|~1~|~01/NHS~|~Roadway~|~04 - Reconstruction - No Added Capacity~|~D311498DB02744EAB8E2BFBF60FCB0666A1EAF97 121008~|~1~|~1~|~01/S5K~|~Realignment and reconstruction work in the City of Kenton.~|~04 - Reconstruction - No Added Capacity~|~1AA023EBF68D7F469840F65B6C857F65CD140DF3 121008~|~1~|~2~|~02/S5K~|~Resurfacing work on US 68 and SR 31.~|~05 - 4R Maintenance - Resurfacing~|~71545EDC9021A7DD928A8A6F2A3185A2E42F7624 125949~|~1~|~1~|~01/NFP~|~Plan split for lighting repair and replacement contract.~|~21 - Safety~|~9D5890AFFCA76C972ACC152E66D6BCE734935DAE 124554~|~1~|~1~|~01/BRO~|~Bridge replacement.~|~~|~B600F8B3703D580C0C2D50E172720585AEA8ACB1 124554~|~1~|~2~|~02/NHS~|~Conduit replacement~|~66 - Resilience Improvement - Highway Project ~|~F1997350E4959277CF2A74FDD955DB618571FB9A 100528~|~1~|~1~|~01/STR~|~Microsurfacing of HAS-9 from SLM 10.63 to 13.24~|~05 - 4R Maintenance - Resurfacing~|~C72EC1E276DA3CF4F322C8E190F17FF41A1CAAB1 119236~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~8F42CEA57EF5CA4BD7951AB210ACBA3E8B29CDF9 121677~|~1~|~1~|~01/S>2~|~Ped/bike trail ~|~28 - Facilities for Pedestrians & Bicycles~|~0344C19310D2B4A9173BF085DD21B39F0640F062 120352~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in ATB, MAH and TRU Counties.~|~21 - Safety~|~6D7CD00295A8786C837DC4A286F089D635DD8D67 110077~|~1~|~1~|~01/IMS~|~All work in this plan split using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~0C69E2ABC86FAB4E56219B096835BC3081745219 115532~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~C1B81BF95FF085FDD23AD31B32076B1DE913A6D7 111616~|~1~|~1~|~01/NHS~|~Overhead bridge approach pavement repairs/resurfacing~|~05 - 4R Maintenance - Resurfacing~|~E4C024F1BFF6B92A446FFD4EF02492272AAC2348 103932~|~1~|~1~|~01/ENH~|~Construction of sidewalk near Harding Elementary in the City of Youngstown, Mahoning County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~C3ABC0A1D2EEFE482ECD829EC766A721FE493169 89461~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to build a roundabout at LUC CR8 8.38-9.39/LUC CR71 5.35-5.36~|~21 - Safety~|~9BC53BB368601A3BEB9A700F86F1FD38E5E9715A 122178~|~1~|~1~|~01/NFA~|~NEVI Round 2B MUS 70/77-A~|~~|~10907001A9FE742E7FF0C7F50C5926601DB099D7 84523~|~1~|~5~|~05/STR~|~Resurfacing - Non Federal Aid System - 100% 4PS7 (State) HUR-103-05.69 - 07.39~|~05 - 4R Maintenance - Resurfacing~|~1AE792C1CBC5770E90D79593E3FE04F56F2A0A02 84523~|~1~|~4~|~04/STR~|~Bridge Rehab - Pier EncasementsHUR-103-01.60~|~13 - Bridge Rehabilitation~|~5510810862F2BE7D2E9DDD97D36A17DEFE79C2AC 84523~|~1~|~3~|~03/STR~|~Resurfacing Fed/State 80/20 4PF7/4PS7~|~05 - 4R Maintenance - Resurfacing~|~97C488373FAA0AEC26A7A32D1DC931EBDF25AB07 84523~|~1~|~2~|~02/STR~|~100% City of Willard~|~05 - 4R Maintenance - Resurfacing~|~B34606D0DE9049FC9DED98980D2D1EA402E355E6 84523~|~1~|~1~|~01/STR~|~Rural paving - 80/20 - District Allocation/City of Willard~|~05 - 4R Maintenance - Resurfacing~|~C0031C0E8471A8B0C2E070D4C4CCB0BF1301D84B 101984~|~1~|~1~|~01/NFP~|~Spot pavement repairs on various routes throughout Portage, Stark, and Summit Counties.~|~05 - 4R Maintenance - Resurfacing~|~422F9332E025A833108B8C6FE1C631A7B0E8EBD6 89501~|~1~|~1~|~01/S<2~|~"01/S<2/PV/HEAT" Resurfacing of Hopewell Drive within the City of Heath between SR13 and SR79. 1.5" of pavement to be planned and replaced with 1.5" of 448 asphalt. Existing railroad crossing will be removed and replaced with asphalt. Pavement will be restriped with Thermo Plastc Markings and RPM's - LCATS Cap of $232,000~|~~|~4F0B699E71462EA56DFD7933E4BDAF29F72066B5 98977~|~1~|~1~|~01/MPO~|~Resurfacing Riddle Ave from Liberty St to New Milford Rd in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~C1DA65E55F8263B524FC56B9D442EB630A3BB9D2 108642~|~1~|~1~|~01/NHS~|~Pedestrian improvements along Cleveland Ave~|~21 - Safety~|~F7AB01E80F425D4B49F8933D3EA3EB8F31E2F289 89247~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Mus-SR 666-01.78 to 2.75~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7EBDE81683CCD46DC14ABA49094B8B92863F16D1 89247~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Mus-SR 666-02.75 to 14.17~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D689A03B6CB3347A48595902BA4DB0787B1C49CF 89247~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - District Preservation 4PF7(80% Federal) / 4BG6(20% Local OPWC) - CAP $21,246.33 OPWC Funds - Urban Paving in City of Zanesville on OFAH-Urban portion of Mus-SR 666-00.00 to 00.57;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8E91BE49B864478FEA94780E7108C30F9FD1B40E 89247~|~2~|~5~|~05/NFA~|~"05/NFA/CV/ " - District Preservation 4PS7(100% State) - No CAP - Culvert Replacement on Mus-SR 666-13.61~|~44 - Other~|~1D14933BA66B04497E6585B8E52CAF2DBADA7E66 89247~|~1~|~4~|~04/NFA/ZANE~|~"04/NFA/PV/ZANE" - District Preservation 4PS7(80% State) / 4BG6(20% Local OPWC) - CAP $42,492.66 OPWC Funds - Urban Paving in City of Zanesville on NOFAS-Urban portion of Mus-SR 666-00.57 to 01.78;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E8E8DB710A5718811A6E80E6500ACCA87B327CF9 124454~|~1~|~1~|~01/STR~|~Construct crosswalks~|~21 - Safety~|~73DB6BF312BE3ACB5177E02452D5F37641C29174 108797~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 5.95-5.99. 80% Federal ER and 20% State ER funds. MOE-003, OH2018-01.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~69CF823142A7DCD1D9AA0C164E73A3BE1D6AC7E7 108503~|~1~|~1~|~01/NFP~|~All work in the project to replace the bridge.~|~10 - Bridge Replacement~|~29DB28BAF7ACC067C4A1AA09C36CECD744FBF51E 124007~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~ED303C866DA261120CF44BCE50B4E8F172D880A3 108660~|~1~|~1~|~01/MPO~|~roadway diet work eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~985D05C2033F5A57B26B2C05FA4701B8A32CE299 119125~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~ECA583BC73C8DE2EE62D8F2066078717C359294E 119125~|~1~|~2~|~02/SAF~|~Installing signal at SR 162/SR 21 SB Ramp and installing a new left turn lane between the NB and SB ramps.~|~21 - Safety~|~8E8FB8FEBE606069665AC43A390D6D2D2ED6F7CA 83060~|~1~|~1~|~01/STR~|~PIK SR772 2.04 - 9.11 ResurfaceingOn SR 772, beginning at the Scioto County line and heading north east and terminate the project at SR32, it is proposed to resurface the highway with asphalt concrete.Brdgs 6603157 PIK SR772 7.90 Intersect: Bull Run6603181 PIK SR772 8.16 Intersect: Bull Run6603211 PIK SR772 8.62 Intersect: Bull Run6603246 PIK SR772 8.76 Intersect: Bull Run6603211 PIK SR772 8.62 Intersect: Bull Run 6603246 PIK SR772 8.76 Intersect: Bull Run 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~D5FF2F6D4573E159B314A26200B10E682C937C56 117512~|~1~|~1~|~01/BRO~|~Bridge rehabilitation work eligible for CEAO LBR funding. ~|~13 - Bridge Rehabilitation~|~16AC84628AE7B913E024156240FA68BF58210FE2 117512~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~13 - Bridge Rehabilitation~|~52A25F2D51C93F5AA83EE7C6D0806F4FC6D54A8C 102378~|~1~|~1~|~01/NFP~|~All costs for this facility project.~|~44 - Other~|~0747CD9E8B440CCE6A9D07CE48FD934E08ACAA5D 111074~|~1~|~1~|~01/IMS~|~GSM funded plan split~|~21 - Safety~|~643BC5455291D1CE2AFBAD647F168038A51DA4F3 100927~|~1~|~1~|~01/NHS~|~Safety Itmes~|~21 - Safety~|~2702C2B7D1878F964AF7D07B14FD168378D85B66 124990~|~1~|~1~|~01/MPO~|~MPO CRP funds~|~21 - Safety~|~7187DD23CC4C062198F5058A6A23A7850F1CB476 83083~|~1~|~3~|~03/NFA~|~Chip & SealROS -SR -372 SLM 0.000 to SLM 0.680 1.360 LMSCI -SR -371 SLM 0.000 to SLM 0.400 0.800 LM 100%% state~|~05 - 4R Maintenance - Resurfacing~|~2094051A1CEB43178A6F61600BF6C6D01D3E5D4F 83083~|~1~|~2~|~02/S<2~|~Chip & SealSCI -SR -239 SLM 0.760 to SLM 1.220 0.920 LM80% fed/20% State~|~05 - 4R Maintenance - Resurfacing~|~2E7FF9F26F50E3B015D2FD3BF89EABD520BC4098 83083~|~1~|~1~|~01/STR~|~Chip & SealROS -SR -41 SLM 3.970 to SLM 14.920 21.900 LMSCI -SR -239 SLM 0.000 to SLM 0.760 1.520 LMHIG -SR -41 SLM 0.000 to SLM 7.360 14.720 LM BRO -SR -125 SLM 11.860 to SLM 15.380 7.040 LM80% fed/20% state~|~05 - 4R Maintenance - Resurfacing~|~C6AAD3CFD4301A990A18F5ED65BB4CB53E7660BC 98888~|~1~|~1~|~01/IMS~|~MIA IR 75 0.00-4.83 - MOT IR 75 23.56 - 24.42 Repair/Replace deteriorated sections of the median barrier wall and rebuild median inlets at specified locations.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8DD0674B60577680749D73B0450DBF322F412808 98490~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~81D4E374FC547DCD0F3BCF723B50E9B00249A751 121322~|~1~|~1~|~01/NHS~|~added NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~0494746265443E70A7920F15A3C22FC65883F4B5 102110~|~1~|~1~|~01/NFA~|~FY16 construction inspection~|~17 - Construction Engineering~|~8A86F380C9ABA8F2ACE1EA5B00A3AE27251F0316 102110~|~1~|~2~|~02/NFA~|~FY17 construction inspection~|~17 - Construction Engineering~|~EEA2A83B461B722AD4E5D6904D8D72BEEE9371B9 126332~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~3EBC5FFD64FD8155782B0E5A8EA6A70087480461 105946~|~1~|~1~|~01/S>2~|~Construct electric vehicle charging stations and vehicle purchases~|~44 - Other~|~CEE91EA402434993920999C0CE7B899D25E0B5AD 101000~|~1~|~1~|~01/STR~|~This plan split is for the rural routes~|~05 - 4R Maintenance - Resurfacing~|~8F28534B5DFFDFF392DCF45113C0CFB5662BD7F3 101000~|~1~|~2~|~02/S<2~|~This plan split is for the small urban route.~|~05 - 4R Maintenance - Resurfacing~|~A7710A0816CD091AEE3DC48AB676C4871B8D8831 100346~|~1~|~1~|~01/STR~|~All work in project. Federal and state funds from the District Preservation Program budget. SAC 4PF7 and 4PS7. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~ECE9BB7E69DC2997C3AE9A36410477DA38C50144 103822~|~1~|~1~|~01/NHS~|~Bridge repair on NHS bridges.~|~13 - Bridge Rehabilitation~|~411B93B0ED1FB048DFCADE7799B3ED7E28751B10 92500~|~1~|~1~|~01/STR~|~Guardrail~|~21 - Safety~|~89EABFFC342107E3565C197D45AE0FFF2D1EB14C 103493~|~1~|~1~|~01/ENH~|~Construction of an 8' wide sidepath on the north side of Indian Ripple Road from Harbert Drive to Grange Hall Road, and a 5' wide sidewalk on the south side of Indian Ripple Road from east of Marydale Drive to Grange Hall Road. Addition of curb and gutter and storm sewer on both sides of Indian Ripple within the project limits.~|~28 - Facilities for Pedestrians & Bicycles~|~E09C3C386C75A7516A1570DA0D92685687C60049 110362~|~1~|~1~|~01/SAF~|~CEAO Safety funds plan split~|~21 - Safety~|~00219F32A72D182C67CF4A85DA49C086B1DD6F8F 85692~|~1~|~1~|~01/BRF~|~Bridge replacement on Prospect Street in the Village of New London~|~10 - Bridge Replacement~|~2EC08116B7E1BC298675B4151CDA19D371FAD728 105457~|~1~|~1~|~01/NHS~|~AC Overlay without Repairs~|~17 - Construction Engineering~|~CD217EC1EE8BBB29C8C3AFC19E734A5F74419F5F 115182~|~1~|~1~|~01/IMS~|~Construction of Type II Noise Barrier along IR-480.~|~20 - Environmental Only~|~4FF34B856A31C0225DFFD36F2B59DAEBD124941C 112582~|~1~|~1~|~01/NHS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work.~|~47 - Bridge Preventive Maintenance~|~377C12BF3C71082A0ECD7872E61EFBC07E073FAC 106404~|~1~|~1~|~01/SAF~|~Install sidewalk on the west side of US-27 from Banning to Brynside; painted crosswalks at Brynside intersection and ADA curb ramps; unsignalized crosswalk north of Banning with concrete median island and RRFB or PHB~|~21 - Safety~|~7698EEA75377816BF0F277244EE3105C227079FA 106404~|~1~|~2~|~02/SAF~|~Water work to be paid by GCWW~|~21 - Safety~|~188CDC06137330E4F9B420407413EDC13311E79C 105241~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9053F66018DDF14AC0DB9035FAFD774B4DFFFA49 105241~|~1~|~2~|~02/NHS/GREE~|~Resurfacing, urban paving in the City of Green.~|~05 - 4R Maintenance - Resurfacing~|~391B145A926F856CFE3F18098C1D5150E81D4B61 105241~|~1~|~3~|~03/NHS/GREE~|~100% city items including resurfacing of side roads at Steese Rd Roundabout, full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~47C0965D434313E4A4D9228C57D7C2953FEB0A18 108105~|~1~|~1~|~01/MPO~|~Mill and resurfacing on the roadway in the City of Moraine.~|~05 - 4R Maintenance - Resurfacing~|~E59AE49B56FBB5E67579F3B7B8577F518448369E 116394~|~1~|~1~|~01/NHS~|~Crack Sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ACBA18726C2C88BCBFD552302E836883A646D39B 100851~|~1~|~1~|~01/NHS~|~ROS 23 9.38-10.9735 0.00-4.48~|~05 - 4R Maintenance - Resurfacing~|~097BDDA96F1B74EC7AB7600169874F48680EDAAE 97248~|~1~|~1~|~01/IMS~|~MSC OL of FRA-270-36.94 L, SFN 2511800, over Big Walnut Creek~|~13 - Bridge Rehabilitation~|~762D43C41DC5E6086BD8E724987DFA29CDA2CE93 126151~|~1~|~1~|~01/NHS~|~nhs ~|~05 - 4R Maintenance - Resurfacing~|~8FEF95E0955F1ED4889C33824C32018FE9732A52 90250~|~1~|~1~|~01/NFA~|~Plan Splits. 100% Fed CEAO~|~21 - Safety~|~474CF6592829F277F056DBD38FE3AD5023B350E4 115056~|~1~|~1~|~01/BRO~|~Replace bridge carrying State Route 799 over McFadden Run/Clendening Lake. ~|~10 - Bridge Replacement~|~754C5D5FF941910243D9EC3E565C8F9E1C2835F6 114977~|~1~|~1~|~01/STR~|~All work is in this plan split from district allocations using SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~F52A6A1414B79C54DC785862D267F623DA46F368 85108~|~1~|~3~|~03/NHS~|~Resurfacing project on COL-45 from 15.34 to 16.43 near Lisbon, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~254ED8BE8C9FF55160B4E37F5E745A3CF3025DCC 85108~|~1~|~1~|~01/STR~|~Resurfacing project on COL-45 from 16.43 to 16.92 and on COL-164 from 9.78 to 14.26 near Lisbon, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~2FD79A92B67EAB1DFD100D73328319DE98610294 85108~|~1~|~2~|~02/S<2~|~Resurfacing project on COL-164 from 14.26 to 14.87 and from 15.22 to 15.60 near Lisbon, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~61956BD48EB4DA8461F000FD74C7F2F95B362D9A 85108~|~1~|~4~|~04/NFA~|~SR 164 from SLM 15.60 to 15.67.~|~05 - 4R Maintenance - Resurfacing~|~DAC0E0EF8354BF144A5750BCD7D976631C9CA7B2 105186~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~04 - Reconstruction - No Added Capacity~|~F517F7407118C0F6C36BB88F441FC85194159477 84406~|~1~|~1~|~01/NFP~|~80/20 funding split for work that is eligible for urban paving funding~|~05 - 4R Maintenance - Resurfacing~|~7112D999899635BED3249D0AFC488F80DF024C06 84406~|~1~|~2~|~02/NFP~|~100% local funding for the following: 1) work items not eligible for State funds and 2) cost above the State capped funding.~|~05 - 4R Maintenance - Resurfacing~|~DEF11AB240C4A313F68E132BE0298920DF3F4101 92738~|~1~|~1~|~01/NFA/Mill~|~Plan Split for the resurfacing of Robinson Hill Drive, from Old Furnace Road to West Glacier Drive, in Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~D1ED78565ED7D51A1E3523733838306F8700DCA8 95109~|~1~|~1~|~01/CMQ~|~80% federal / 20% local pariticipation using MPO CMAQ funds for the upgrade/replacement of the signals along SR-17, SR-252, and Butternut Ridge Road in the City of North Olmsted.~|~21 - Safety~|~CD5600A69CC827D632250118CBFD4606EF104681 95109~|~1~|~2~|~02/NFP~|~Split 2 for 100% local work beyond the original project scope~|~21 - Safety~|~92DB5DC329E0BA3C0E2130F2CE8047C53F49E390 82981~|~1~|~1~|~01/BRF~|~ Rehabilitate existing structure to legal load limit; repair abutments as needed, replace deck, paint structure, apply scour protection and railing repair on Seven Mile Road-0.72 mile east of SR 127 SFN 6831826 sponsor Preble County~|~13 - Bridge Rehabilitation~|~1E075C6E2A83A8439744073CE3A17A7F46D997A4 98739~|~1~|~1~|~01/NHS~|~?01/NHS/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS routes in Fairfield, Guernsey, Muskingum & Perry Counties.~|~44 - Other~|~D60B14E4679851EE321D0FED1EB08B84FD20AB8A 98739~|~1~|~2~|~02/S<2~|~?02/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes in Fairfield, Guernsey, Muskingum & Perry Counties.~|~44 - Other~|~14BA9527DC0EA27F364C57BFA49EEA1C545D0A0F 98739~|~1~|~3~|~03/STR~|~?03/STR/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routesin Fairfield, Guernsey, Muskingum & Perry Counties.~|~44 - Other~|~B4F83D20BB268E1EBB2AB0DA1538EF90438704B1 98739~|~1~|~4~|~04/NFA~|~?04/NFA/OT/ ? - District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NOFAS-Rural routes in Fairfield, Guernsey, Muskingum & Perry Counties.~|~44 - Other~|~1B511B32AE707BE2228E707630DECC29FEB5F690 102267~|~1~|~1~|~01/STR~|~ER Slide Repair~|~44 - Other~|~6EF7157C5F67B1177A42B66024C881B22B24142C 102267~|~1~|~2~|~02/STR~|~Split for change order.~|~44 - Other~|~CE9C4AB33D9C58EA2717A6E4F01AF535BFAA9EF2 80729~|~1~|~1~|~01/CMQ~|~CMAQ funding to be used for construction of the new structure.~|~01 - New Construction~|~057E7A115F4EECA0448F11002BD9729AD065570D 80729~|~1~|~2~|~02/NFP~|~100% local participation on work items not-eligible for federal funds.~|~44 - Other~|~68FC673A61437C5F16EA85A1DBFEC15DFDAF627A 91518~|~1~|~1~|~01/BRO~|~Replace superstructure (BR eligible for rehab & replacement)SFN 2508583, FRA-104-5.63, Over I-270~|~13 - Bridge Rehabilitation~|~98C1A9826ACACEB7CCCA8E0E4EA0DE4893039290 90931~|~1~|~1~|~01/STR~|~District Allocation~|~10 - Bridge Replacement~|~1D3A597DB09472D2DBB12C81CB1965E375CA97AE 101988~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~06873A4E01D0779E59281F81A6665FB226A159DE 122053~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~562951A726AD4C471F12E16BFFCE657694D33009 92357~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment. install retaining wall to mitigate landslide.~|~04 - Reconstruction - No Added Capacity~|~A6CACA890B7B387A94EDA8636899547C1D183CD5 124970~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on interstate system~|~05 - 4R Maintenance - Resurfacing~|~374C99A4C8CF3FA72C4CE9C21C09FB19160A7AC8 97352~|~1~|~1~|~01/NFP~|~Split 1~|~04 - Reconstruction - No Added Capacity~|~B5D429737AC2BA78E22BDFA18A7E84E53A5E367B 105501~|~1~|~1~|~01/IMS~|~All interstate~|~05 - 4R Maintenance - Resurfacing~|~E775F5D595169F1ADBB91A22F8500C444F9EFAB9 105501~|~1~|~2~|~02/IMS~|~Created CO CO Engr 01 plan split for all interstate routes~|~17 - Construction Engineering~|~A7EEFBC6BD8152A190B87A544D994638926BA4BF 110844~|~1~|~1~|~01/SAF~|~Provide sidewalks, curb, curb ramps, retaining walls and BMPs along 17th St and Ann St~|~28 - Facilities for Pedestrians & Bicycles~|~A7290FD2B2171CEADA18EAA3BE8F71543264D361 92828~|~1~|~1~|~01/NFP~|~All work for this project. 100% state funds. SAC 4MA7 funds provided by ODOT District One.~|~44 - Other~|~5886F30621D1D9769ED7F2086218524577C2148B 126440~|~1~|~1~|~01/NFP/MILL~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~AFC39ACF87C09FE1BDD547EF1A1620915F20621A 95924~|~1~|~1~|~01/S>2~|~Repaving to include minor base repairs and traffic signage upgrade CR 25A from Donn Davis Way to Commerce Park Drive. Kessler Cowlesville Road from western Tipp City Corp to Rosewood Creek Subdivision.~|~05 - 4R Maintenance - Resurfacing~|~BB960F14663903641EF322DAE2FF5AFD4AB6CBFB 92582~|~1~|~2~|~02/S<2~|~This is for the slide~|~21 - Safety~|~EDA7F036BC66128D99F26BB29AA8D1AE00743236 92582~|~1~|~1~|~01/SAE~|~OTT SR53 4.9-5.37~|~21 - Safety~|~F790D107EA9346A7164640D0A2396AE07443231D 108312~|~1~|~3~|~03/STR~|~MGS Guardrail Upgrade along rural routes.~|~21 - Safety~|~EB85E46E40E9FFE14FA70992CFE36191E4E5899C 108312~|~1~|~2~|~02/S5K~|~MGS Guardrail Upgrade along STP Routes~|~21 - Safety~|~CA1F58B1E0BD49DD48DB882B79ED66AF44DF9786 108312~|~1~|~1~|~01/NHS~|~Guardrail repairs on State Routes along NHS routes~|~21 - Safety~|~AA094411C7C0C5F79B6BE298DD9AFC3ED32877D5 91153~|~1~|~1~|~01/NFP~|~Maintenance contact for SFY 2015 herbicidal spraying. 100% State.~|~44 - Other~|~5430ADECA5B052A584B2A3106F7A379E6E835E74 108765~|~1~|~1~|~01/S>2~|~Bridge rehab on local bridge in the City of Miamisburg.~|~13 - Bridge Rehabilitation~|~802A9258B0DA6043F1F5E6CE0F384F43EB0FECBC 121454~|~1~|~1~|~01/NHS/KENT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8B34DEEF5D078E46F9017C741EE5D8C1421D130F 102851~|~1~|~2~|~02/STR~|~ROS 104 25.45 (SFN 7103905)~|~13 - Bridge Rehabilitation~|~80551DBB72BA4A46F6D23D1EEA8CD8D6FCE81A6A 102851~|~1~|~1~|~01/NHS~|~ROS 35 13.40 (SFN 7101678)ROS 35 18.12 (SFN 7101813)~|~13 - Bridge Rehabilitation~|~08E8F4845F585457539392E10F5449B19171853C 105660~|~1~|~1~|~01/S<2~|~Mill and fill on small urban route: SR 198 SLM 1.63 to 2.22~|~05 - 4R Maintenance - Resurfacing~|~55FDE1655CFF9D27E9FF1E5E2DA5D35AED729AF5 85231~|~1~|~1~|~01/STR~|~Replace Bridge SFN 0405477 ATB 193 1137 over Mill Creek~|~10 - Bridge Replacement~|~ADCCC5E23909F8896FFE3403CCE1DB3FF045F8E0 118966~|~1~|~1~|~01/SAF~|~Plan split for reflective/wet reflective pavement markers.~|~21 - Safety~|~4A58D7069C4A653F8EE4857BC3475B2065E5B767 94677~|~1~|~2~|~02/IMS~|~Replace structures.~|~~|~9B01589AD24812A7B4A7B3EA1D3047037FE0D73A 94677~|~1~|~1~|~01/IMS~|~Replace deck~|~~|~3557CE883DA59DE15714866735CAE231460B0193 103102~|~1~|~1~|~01/STR~|~Plan Split 01 created for routes requiring RPM Pavement Markings in FY22~|~44 - Other~|~F1C891FBB7B47D03DB444FE13FA190E9F22DD0BA 102883~|~1~|~1~|~01/STR~|~STP rural for slm 8.91 to 11.46~|~05 - 4R Maintenance - Resurfacing~|~C269008140172B1B5700F4B9BC8604E6B7612FFB 102883~|~1~|~2~|~02/S>2~|~LUC-64 from SLM 2.10 to 2.15 and SLM 2.67 to 6.369~|~05 - 4R Maintenance - Resurfacing~|~CA27618DE3D12D86A9119728CD473F8D84D8BE9F 111266~|~1~|~1~|~01/NFA~|~Barkcamp Park Beach Parking Lot resurfacing~|~05 - 4R Maintenance - Resurfacing~|~937DCBAEB9E96B48AA5DF3D22A4288DAE826D837 120662~|~1~|~1~|~01/STR~|~Culvert rehab and replacement.~|~04 - Reconstruction - No Added Capacity~|~BD5EA54A4B9268EAE2F90A2B7A96F9E97542FF1D 108566~|~1~|~1~|~01/NHS~|~Rehabilitate existing utility bridge that carries utility lines above US 30. Rehabilitation to include: replacing the deck (utility maintenance platform), replace the rocker bearings with elastomeric bearings, repair broken pipe hangers and supports, repair section loss on main girders and constructing fence to eliminate vandal access to deck. Structure will be painted with OZEU painting system.~|~13 - Bridge Rehabilitation~|~B8463FDA1F04A7546AB1C2E679665517D85456AB 94567~|~1~|~1~|~01/NFP~|~Lighting repair and maintenance on various routes in Portage, Stark, Summit counties, Ohio.~|~21 - Safety~|~65EAEB9664718F9C94B50820038159FC2CEFC334 108104~|~1~|~1~|~01/STR~|~Split for resurfacing rural STP route~|~05 - 4R Maintenance - Resurfacing~|~5A1B2177695E79C236083F3AF06F1D6F84E87B8B 97283~|~1~|~1~|~01/STR~|~Disrtict wide herbicidal spray project.~|~44 - Other~|~2C5830276A5D6B333696A13348EBF0B58D110314 97549~|~1~|~2~|~02/BRF~|~Ohio Bridge Partnership Program. SFN 5233232, West Smith Road~|~10 - Bridge Replacement~|~5002F00830087686454D934814B5A756357E1266 97549~|~1~|~1~|~01/BRF~|~Ohio Bridge Partnership Program. SFN 5233860, Branch Road~|~10 - Bridge Replacement~|~81788FF69BD7A5897F68A408E864C2BE58975CF4 98554~|~1~|~1~|~01/NHS~|~Concrete pavement repair on US 30. Funding is 80% federal and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DD4D449FEE957C43369EAB1E7C1C1B498EE04A5B 98554~|~1~|~2~|~02/S<2~|~Concrete pavement repair on SR 12, SR 613 and CR 99 in Hancock County. Funding is 80% federal and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~92E718338B678B5E03BF793B55276E3FC15E42C2 106990~|~1~|~1~|~01/S<2~|~GSMP slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~566ACC28779829C74A9EB745150163A7ADB27B9E 96703~|~1~|~1~|~01/NFA~|~TRU Brookfield Outpost, expand garage by 2 bays (approx 40'x42') to store 2 more trucks and tie into sanitary sewer.~|~~|~2E2B45599D057934B92774DFC998FAAD054FFA66 114555~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A10E886C466EC1B05F8E46665E360656EA505A3F 114555~|~1~|~2~|~02/STR~|~Resurfacing - Spangler Road~|~05 - 4R Maintenance - Resurfacing~|~09B16741BBDDAB03F97F50C70CAF588364412B2F 109271~|~1~|~1~|~01/NHS~|~Replacement of SFN 4501632 (LIC-37-9.645)~|~10 - Bridge Replacement~|~F2C21868D74B9139733D6AFF21355108E79C6F7E 110140~|~1~|~1~|~01/STR~|~Asphalt Concrete Resurfacing. Fed / State funding within and outside of Dalton.~|~05 - 4R Maintenance - Resurfacing~|~AA589577FFB473083CABB788B43C06959EE150FF 96689~|~1~|~1~|~01/NFP~|~Unfunded mowing contract~|~31 - Landscaping & Other Scenic Beautification~|~A21574B6BD00BCD939352962FB2D819E3A074971 97389~|~1~|~1~|~01/BRO~|~Split for all bridge work using BR funds at 80/20.~|~13 - Bridge Rehabilitation~|~5C3981DD706EF3D8D4ACC1011C1BE2BA7A07E428 96781~|~1~|~1~|~01/IMS~|~Pavement Marking~|~21 - Safety~|~402DAFBBEF8CF1C60102A2F3D686BC8690F105E3 120380~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~94DA0284DC72EDE2FE70CBBA50A2E13852A636DF 96719~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~DB1DF568724675D8D0C41F696A4B6C8CD547CD55 116692~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~64E1DF31357FCA17A4E0BB366F33F16DB144DE0C 116692~|~1~|~2~|~02/NFA~|~Not on Federal Aid System Plan Split~|~05 - 4R Maintenance - Resurfacing~|~05313933E86E57662683E3B6BCA163F76EE32D5E 116692~|~1~|~3~|~03/S5K~|~STP 5,000 - 49,999 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~48492FEF30A9D8EFC2F25D5DC0E349D8CCEC6F7C 116692~|~1~|~4~|~04/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~6E18B3AD03801D93932839BC1FEB599090956F3D 107768~|~1~|~1~|~01/NFP~|~All maintenance related bridge work. All work to be included in this split except for collision repair damage to McClain Road Bridge (SFN 0201723).~|~13 - Bridge Rehabilitation~|~DCCDE13D7726D702474D2031726945B8FC031606 107768~|~1~|~2~|~02/IMS~|~All collision repair work to SFN 0201723. No maintenance related work to be included in this split.~|~13 - Bridge Rehabilitation~|~18DE8DD9CA4D5C3F890ECAECB9CEA6754AE2B014 122442~|~1~|~1~|~01/NHS~|~Construct RCUT on US 23 at the SB rest area~|~21 - Safety~|~5B79A947EE2596D7222CEB268B423CD65B12A1D8 87125~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2019~|~47 - Bridge Preventive Maintenance~|~810880FBF5A504FF6F485515AF2E02B2EAFBEB29 105710~|~1~|~1~|~01/MPO~|~MORPC funds for bike share, 26 stations/232 bikes.~|~44 - Other~|~86D9C634F307E8CF62AD464E82C599FB4E504E93 105710~|~1~|~2~|~02/MPO~|~100% Local Items~|~~|~810D1A39618CE4BAA88F4ED13FBB4A9BC29EE028 81746~|~1~|~3~|~03/ENH~|~Sidewalk 03/ENH/OT/~|~28 - Facilities for Pedestrians & Bicycles~|~17E63671FD8E2D2F26032F488ED8D50B46CA5559 81746~|~1~|~4~|~04/NHS/WOR~|~100% Worthington paid items - lighting, fence lettering (alternate items for signs and signals)04/NHS/OT/WOR~|~31 - Landscaping & Other Scenic Beautification~|~28B3F4D2CAD6FB7401C770D7DC686BBEC7D4E2AB 81746~|~1~|~7~|~07/NHS/AEP~|~100% AEP items at Campus View & Flint~|~43 - Utilities~|~49BF1E4474A036002F9920E833B1976B8809B810 81746~|~1~|~6~|~06/NHS~|~Brdige replacement & widening:SFN 2500752, FRA-23-22.91, over I-27006/NHS/BR/EX~|~10 - Bridge Replacement~|~503B6CDAB944562C12D5248C3412214276F8B2D9 81746~|~1~|~9~|~09/NHS/FIBE~|~100% items for Columbus Fibernet at Campus View~|~43 - Utilities~|~83AF662578B95CFE5E15E426FF18373A44AB4F1F 81746~|~1~|~8~|~08/NHS/AT&T~|~100% items for AT&T at Campus View & Flint~|~43 - Utilities~|~9304D4BE6FC883FF59E100113F59AE632363040A 81746~|~2~|~10~|~10/NHS~|~Adding lane with sidewalk & bikepath, Flint to Lazelle~|~03 - Reconstruction - Added Capacity~|~B0FA9CDFC77E29A62B6337E52AE17B6FACC85E5B 81746~|~1~|~1~|~01/NHS~|~FRA-23 roadway work, SLM 22.85-24.65, area N. of I-270 bridgeIncludes retaining walls, 270 CD lanes, ramps, York Temple Dr01/NS/PV/~|~03 - Reconstruction - Added Capacity~|~B30151EC84D0CC41D4283B318D6538D3DDB7E287 81746~|~1~|~5~|~05/NHS~|~New Bridges:SFN 2500760, FRA-23-23.30, under Campus View BlvdSFN 2500779, FRA-23-23.63, under Flint Rd05/NHS/BR/NEW~|~08 - Bridge - New Construction~|~C1B4276742C28E0EC378277CC62CD964C1898090 81746~|~1~|~2~|~02/S>2~|~FRA-23 roadway work, SLM 22.23-22.85, area S. of I-270 bridge02/S>2/PV/~|~03 - Reconstruction - Added Capacity~|~E11AAB1434198B19D130A4345A2F9CE09F2094B4 91558~|~1~|~1~|~01/IMS~|~Bridge painting project. Various locations in D10.~|~47 - Bridge Preventive Maintenance~|~576934DE2376457AA4BD08320FD111F1EB68963A 93416~|~1~|~1~|~01/IMS~|~resurface LUC IR 475 0.00-8.98 - Wood County Line/Maumee River to Central Ave overhead~|~05 - 4R Maintenance - Resurfacing~|~6D3A6FB7CA25F8718B8B4F5DD9FF6767D36C9B12 125029~|~1~|~1~|~01/NFP~|~Plan split for Type 1 emergency repair work at the interchange of I-75 with Union Centre Boulevard in Butler County.~|~44 - Other~|~FF28CF460B7B3907C8B9A1F6974167FE2B500CE2 116396~|~1~|~1~|~01/STR~|~Guardrail replacement~|~44 - Other~|~F6B14A4DE957465A5E4DC5EB3995FF345D5EA236 119901~|~1~|~1~|~01/STR~|~Project to address flooding location by improving drainage and realigning vertical roadway profile at VIN 93 7.20-7.40. Funded 80% Protect/20% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D5E2B18F76C9616B360E202324A676AC381D686 113633~|~1~|~1~|~01/SAF~|~Split 1 for pavement grooving and optics on the interstate routes~|~21 - Safety~|~A3211D7FE712B8778858A79449B061A545219A36 113633~|~1~|~2~|~02/SAF~|~Split 2 for pavement grooving and optics on SR-2~|~21 - Safety~|~EA7DC4A08BF38298B586E73A9D2DB17C124E110C 121861~|~2~|~2~|~02/S5K/ZANE~|~STBG Large City funds for Asphalt Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~22E6ED504588F96CFF5ECA9042AF780044475759 121861~|~1~|~1~|~01/ENH/ZANE~|~Streetscape, pedestrian facilities and related work along Fourth St from Market St to South St in the City of Zanesville. (TAP Safety 80% 4B37/20% 4HJ7)~|~28 - Facilities for Pedestrians & Bicycles~|~AFFE02CAE50547392EEFBA8E64102B163122643E 97772~|~1~|~1~|~01/NFP~|~Construct new Pickaway County Garage~|~01 - New Construction~|~4314AA44850EE6543F7620B5CEB0004970CAE895 121434~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~D93AD3F73E65253179EB81D7D2287D3F88650530 124394~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~E0E9400E94F3C4CF0AC2A76FAAED306B0BA81A67 109682~|~1~|~1~|~01/STR~|~Resurfacing SR 164~|~05 - 4R Maintenance - Resurfacing~|~A0D300BE8423FA410F78B6044BA6AD763D72B928 114234~|~1~|~1~|~01/S<2~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~527365A40B74434929EC14C5320B0D98D2A1A08B 113959~|~1~|~1~|~01/MPO~|~Resurfacing eligible items.~|~05 - 4R Maintenance - Resurfacing~|~01B0A4F679312DE70EC8FBBDFC74939FB03C2731 102109~|~1~|~1~|~01/SAF~|~Intersection Improvement - Median Closure - 90/10 Fed/State~|~21 - Safety~|~26798D5F6275E06AE812C9618BA85554BBEF9907 102109~|~1~|~2~|~02/SAF~|~Traffic Signal Construction at US30 and SR94 using 100% 4HJ7 safety funds.~|~21 - Safety~|~A35172F38E1CC03C76758230F9C4815E517825B0 113342~|~1~|~1~|~01/NFP~|~All work is in this split using 100% state funds from the District 1 preservation program.~|~13 - Bridge Rehabilitation~|~78F2CA9A6ABC5BC00740B2812AEFAC9095CE9CF4 121244~|~1~|~1~|~01/SAF~|~District wide pavement markings~|~21 - Safety~|~0F07FF0128F86801B41850C563F74049D2EE4E05 95273~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 147 16.38-16.43. Emergency B project. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5700C8DEEC2326CF81E431C29533F3C2DDFB2677 7467~|~1~|~1~|~01/MPO~|~Major widening~|~03 - Reconstruction - Added Capacity~|~BC0B8CF25E383BA5392747D7521573CB17BA01A3 92559~|~1~|~1~|~01/ENH~|~Construct ped overpass in Marysville over US-33 and multi-use path on south side of US-33~|~28 - Facilities for Pedestrians & Bicycles~|~25484FAA1210B8D87124558085093BC213E08540 117432~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~781515BE2C0C03D52046A3A95B1636A893DBD5EF 110049~|~1~|~1~|~01/NHS~|~resurfacing on the NHS portion of CLE-125~|~05 - 4R Maintenance - Resurfacing~|~9D3925D2C37067F0D9F06325EDF5956D383DD85F 110049~|~1~|~2~|~02/SAF~|~Centerline rumble stripes.~|~21 - Safety~|~85828E1A90E14AC0F969EE0B3F052DDB107F235A 110049~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~E3B0C7CF64EFA17533D42084216E72225E6AD92B 102269~|~1~|~1~|~01/NFP~|~SFN 3501345~|~13 - Bridge Rehabilitation~|~DB97CF77F091A75011CEEEEF543A6081EC343DD4 116502~|~1~|~1~|~01/STR~|~Plan split for rural.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F9B3B87F5EF4FC2DC9E9079CD2ABDB0CE44F8933 116502~|~2~|~2~|~02/S5K~|~Added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7AF433C05F1BBA632A007D52121B217D40BFAFC 126395~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~406773243B8E0254E3633E62F71BAD6794AE06D7 98819~|~1~|~1~|~01/IMS~|~Split for interstate mowing~|~44 - Other~|~62CCB28400F711EC5C654C5219A15046177FA611 119844~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7~|~17 - Construction Engineering~|~3E45CD3185B3E74DADB844036936E3E60FBF0F46 102212~|~1~|~1~|~01/S<2~|~LAW CR 31 0.40 ER Slide Repair.~|~~|~BB3AD19FC71EBCD3B44B7DE940117C647DB6F039 115672~|~1~|~1~|~01/SAF/CIN~|~Improvements to the intersection of Harrison and Montclair Avenues including construction of curb bump-outs, installation of new ADA compliant curb ramps, and construction of a pre-cast concrete raised crosswalk across Harrison Avenue.~|~~|~5FDCCB58BDF618FD751E53946CFD188E09CE3C4F 85398~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~5081343C55CF3E8B7C3EE0242DA7AB05DCA6A9C4 104070~|~1~|~1~|~01/BRF~|~Bridge replacement on TR 34 (Gore Orphanage Road).~|~10 - Bridge Replacement~|~96D252926646A8C3F0CD05E1611B2C7F12D00B99 126034~|~1~|~1~|~01/BRF~|~Bridge replacement on TR 418~|~10 - Bridge Replacement~|~0B2CAB8E813732C8DAA0435F2B59D9959A84A6FD 121374~|~1~|~1~|~01/NFP~|~FY29 Bridge Holder~|~44 - Other~|~16D0AA2E185052B9E9D11A47C298E7E38966C10D 111089~|~1~|~1~|~01/NHS~|~Debris removal.~|~47 - Bridge Preventive Maintenance~|~469D4BE4E2ECB4044ECD3801ACEF80E8E95CD596 97326~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1955EADB4103F1BB44C1A3ACEAACD311EC4CD943 104795~|~1~|~1~|~01/BRO~|~"01/BRO/BR/NEWA" - City of Newark bridge replacement utilizing LCATS funding (structure file #4560388)~|~10 - Bridge Replacement~|~582530EEC62BABA64CB1A721530B6CA276BC3018 93981~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn CR60, 2.05 miles from its junction with SR28, at SLM 4.10, it is proposed to replace the structure (SFN 7133588). ~|~10 - Bridge Replacement~|~8219D30E202C5D5971F87E28E52C26B9CB5F544C 96020~|~1~|~1~|~01/IMS~|~Mowing contract for the East Central Region of Ohio.~|~44 - Other~|~B764EBF461D304640195AE3A54C011EE3A9EA2B4 122495~|~1~|~1~|~01/STR~|~Roadway rehabilitation and associated improvements utilizing State Oil & Shale funds at 100% up to Program maximum. ~|~05 - 4R Maintenance - Resurfacing~|~76F17BB2F9504CB5DFF01010F4ADEFBC8A5B22A8 118611~|~1~|~1~|~01/NHS~|~Mine outfall repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B83A3149FA3DA75F937D72312C4EED0CB17D0A4F 119072~|~1~|~1~|~01/MPO~|~Road diet along Reading Road from Cornell to Sharon. Improvements to pedestrian facilities, signals, street lighting.~|~04 - Reconstruction - No Added Capacity~|~AE6F261D3C6204D0BCA071BCDEAC988E33D5790E 119072~|~1~|~2~|~02/MPO/SHAR~|~Landscaping and other items not eligible for federal funding. 100% locally funded.~|~04 - Reconstruction - No Added Capacity~|~27B7E1352D090F63F7ACEE2A7C4694CEF37349BC 119072~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded improvements being requested by Greater Cincinnati Water Works.~|~43 - Utilities~|~91557EDE51F5EACB183F376B8089BA2C1ACCE23D 119849~|~1~|~1~|~01/BRO~|~Replace SFN 2560283~|~10 - Bridge Replacement~|~A05EA4E8467E77829DC47E5EB7CEC029D16B569A 111539~|~1~|~1~|~01/NHS~|~1 3/4" mill and fill with superpave asphalt on: MOT-741 SLM 8.38 to 9.54 in the City of Moraine~|~05 - 4R Maintenance - Resurfacing~|~C7E125431B89019EC351C518C3D4FC6F4515D06A 101710~|~1~|~1~|~01/NFA~|~Multi-use trail construction from the current end of the Hockhocking Adena Trail to the intersection of CR 24A and US 50. Not on any federal aid system funded 95 federal/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~57C33EAD1F018C1557347DC2C5449BCB7DF660C1 87746~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~~|~D053D14CE938D270F064D7C53A2C0E991D8E2CB1 87746~|~1~|~2~|~02/NHS~|~Bridge work to be determined.~|~~|~30333B425268E6172B4F8884B14A1CA869118E11 87746~|~1~|~3~|~03/S<2~|~60-AC Overlay w/Rpr WAY SR 172 0.000 to 0.570~|~~|~DC07E310874CEDC3E32824300B7D18C994DC19E2 87746~|~1~|~4~|~04/NFA~|~60-AC Overlay w/ Repair WAY-TR80347-0.00 to 0.144~|~~|~54A70D1DBFE697608949DD69D32C5E83B4E3489A 119243~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~703D71CE9D9C6BFA8162B57767D645A948DAE99D 99437~|~1~|~2~|~02/NHS~|~Replace small culvert CLER-125-1736~|~44 - Other~|~A6012F1322FCB892F40AA65E456058ECCBAFD64E 99437~|~1~|~1~|~01/S>2~|~Replace small culverts CLE-131-0455 and CLE-132-0547~|~44 - Other~|~CF2AB1B1BCE2648C6B5CE3AC69DB41A5473E3BE4 125809~|~1~|~1~|~01/IMS~|~Signs~|~44 - Other~|~F9C3979426ADA4EB66EB2605FF84D92F1EEE5DBF 109882~|~1~|~1~|~01/STR~|~2025 Operations Chip Seals~|~05 - 4R Maintenance - Resurfacing~|~1E6252ED5617CE46B4F3E4713E7330F21400DC66 95692~|~1~|~1~|~01/NHS~|~Addition of 10' asphalt shared use path on the north side of US 20 from County Line Road to SR 60.~|~28 - Facilities for Pedestrians & Bicycles~|~8BFA11BCDCE3AA58AEA458F5099D84D8E420DA69 95692~|~1~|~2~|~02/NHS~|~100% local for removal of encroachments.~|~28 - Facilities for Pedestrians & Bicycles~|~C3CD7A8EF94F859002A1898609FB357E750EE960 123789~|~1~|~1~|~01/STR~|~STP~|~05 - 4R Maintenance - Resurfacing~|~FD74A7E49CD8C6ECF56AB6D317F027F6F644B03A 95379~|~1~|~1~|~01/NFP~|~spot pavement repair locations~|~05 - 4R Maintenance - Resurfacing~|~C13CA39C882ABD0AED12F0F44CBCBAAD3A00F293 118964~|~1~|~1~|~01/S5K~|~Small City (4B97) funding for reconstruction of SR61 (West Main St)~|~04 - Reconstruction - No Added Capacity~|~496A9A28EB97E800D38CE14DB279B3BC05598641 118964~|~1~|~2~|~02/S5K~|~Urban Paving Funding for W. Main St Phase 2~|~04 - Reconstruction - No Added Capacity~|~5217CD706C5C218215636A55E827CA8CCAD8B0C3 118964~|~1~|~3~|~03/S5K~|~CE event for Urban Paving portion~|~~|~7852DEFBA2309DF78953DA0E10FE141A93E77452 123916~|~1~|~1~|~01/STR~|~Slope stabilization along on SR 146 in Muskingum County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2678030514F3A72B43791531633A34E515641448 91938~|~1~|~1~|~01/STR~|~D09 Guardrail~|~44 - Other~|~757BFC2FA3D6F06A7D75269661984F56ACA4C5AD 122209~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-E~|~~|~E4564DC0C8B6D16B9B6C9254ECF39DBE750AA0D5 98820~|~1~|~1~|~01/IMS~|~Split for interstate work~|~~|~56113374389B93BA673600D145B042592FDF36F4 110729~|~1~|~1~|~01/STR~|~Resurfacing of US 68 outside of the Kenton and Findlay Urban Areas. All work on US 68 in Hardin County between the Kenton Urban Area limits at TR 114 at 11.06 and the Hancock County line at 21.80 and all the work on US 68 in Hancock County from the Hardin County line at 0.00 to the ramps to the SR 15/US 68 4-lane expressway at 11.67. District Preservation Program funds.~|~05 - 4R Maintenance - Resurfacing~|~F449DBAD62A2CB9233838814DCB238A9824ACD1F 110729~|~1~|~2~|~02/S<2~|~Resurfacing on US 68 inside the Kenton and Findlay Urban Areas. All works is outside of the cities and Kenton and Findlay. Work on US 68 in Hardin County from the beginning of the project at 10.54 until the Kenton Urban Area limits at TR 114 at 11.06 and work on US 68 in Hancock County from the ramps to the SR 15/US 68 4-lane expressway at 11.67 until the end of the project at 12.13. District Presentation Program funds. No local funds.~|~17 - Construction Engineering~|~20D0A26413D23EEDC60633BD98CCE46EADCD9054 87541~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 6004865 MUS SR146 20.92 Intersect: Boggs Crk #; Not BR Eligible for Replacement: Length=49 SD/FO(1) SR=63.8 DSR=7; 2) 6005101 MUS SR146 27.39 Intersect: Brancj Buffalo Fork #; Not BR Eligible for Replacement: Length=22 SD/FO(0) SR=81.3 DSR=6~|~10 - Bridge Replacement~|~44A81B11BA95BA847566B6BEB5A9E55538CF754B 87541~|~1~|~2~|~02/SAF~|~"02/SAF/PV/ " - HRRR Safety Funding 4RS7(90% Federal) / 4BC7(10% State) - CAP of $716,310.00 - Realignment of TR 389 and SR 146 to improve sight distance and reduce accidents~|~21 - Safety~|~50DF4474DA7B2C21DE4EFF6963C4BD6F28D480E7 101175~|~1~|~1~|~01/NHS~|~Double micro on NHS Routes: LOG US 33 SLM 15.66 to 17.80 & 17.80 to 21.52.~|~05 - 4R Maintenance - Resurfacing~|~ED4EFCE0C08B8FD87B056A674164AD50C255F6FE 101175~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~105DEDC8014C652AD160B144727D5CEC4604B0E5 96342~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge replacement on 6400159 PER-SR 13-05.74 Intersect: Over Tributary of Sunday Creek; Not BR Eligible: Length=15, SD/FO(0) SR=61.8 DSR=5~|~04 - Reconstruction - No Added Capacity~|~2AB6D3E8F9D0CE3E3CE27722DACCD9BDBD869BB2 22984~|~1~|~1~|~01/NFA~|~New bridge over the Maumee River near City of Napoleon.~|~01 - New Construction~|~ACC1F90E2330A357D96BE492ECF4F2FD9AECD1EF 22984~|~1~|~3~|~03/NFP~|~Plan split for Telephone conduit on bridge~|~01 - New Construction~|~F9AE605BDA2F74949869D8C84A5E39A60CBBBFD4 22984~|~1~|~2~|~02/NFP~|~Plan Split for City of Napoleon Waterline Work to be paid by Henry county~|~01 - New Construction~|~00B24CB8C91A1B45378A1F60642A449113743745 97647~|~1~|~1~|~01/STR~|~Resurfacing COL 172 from Stark Co. Line to SLM 8.96, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~C2D685EDA9BA52A9B9FFC1655CBCDE252FDBF8C2 113775~|~1~|~1~|~01/SAF~|~Provide sidewalks for Grace St.~|~28 - Facilities for Pedestrians & Bicycles~|~944C55126E5E18099899AD55A0E52DF2687696B1 94166~|~1~|~1~|~01/BRO~|~Replace existing einforced concrete deck on bridge COL-14-0197 (SFN 1503308) with new composite reinforced concrete deck~|~13 - Bridge Rehabilitation~|~2BFE52E06D493897FCC6FC18A3392F0E2457BC3C 119425~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with Repairs CRA-61, CRA-181, RIC-181~|~05 - 4R Maintenance - Resurfacing~|~A92EF9F6A5F996877C18F1B0DB3C97E873A30025 119425~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs RIC-181-0.013 to 2.40~|~05 - 4R Maintenance - Resurfacing~|~08565A06B84B31398E4C1C5F72C2DC01052830FC 119425~|~1~|~3~|~03/S50~|~Asphalt Concrete Overlay with Repairs RIC-181-2.40 to 2.688~|~05 - 4R Maintenance - Resurfacing~|~09210EBFF706376A717648DE76C48A832618C22A 114390~|~1~|~1~|~01/IMS~|~sock lining and hard lining 42? concrete pipe located I71 ramp and Stewart Road~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C95210A43359EF96AD38388AAEF04AFCD5C5A417 105189~|~1~|~1~|~01/STR~|~All work in this project. All funds are from the District Preservation Program budget. There are no local funds.~|~04 - Reconstruction - No Added Capacity~|~88D433497718E8283E54437D649F0ED48ABA45F8 117223~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 821 8.69. GSM funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2FBC95FFDE8F13DBB83AAB4737B789278CA0862E 106542~|~1~|~1~|~01/NFP~|~Repair and resurfacing of roads and camping pads within Mt Gilead State Park~|~05 - 4R Maintenance - Resurfacing~|~E8E1D629FA0FD2716DBA898DC4757B95A1C2A6F8 123232~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0380117754FE394FD8032145F112F790FD9B361E 123232~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance to multiple bridges.~|~47 - Bridge Preventive Maintenance~|~AFD6E87376A8AA715658D3DD646C0E50C96006AD 106995~|~1~|~1~|~01/NHS~|~GSMP slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~381A58FC91161E1D3599C3785F031C0940D0F844 93500~|~1~|~5~|~05/NHS~|~test~|~~|~0C3CAA22040117FC95AD515811D82A18E923F29E 93500~|~1~|~7~|~07/BRO~|~test~|~01 - New Construction~|~3164A96248D1E215BB05819EB4EC65C58F7D1085 93500~|~1~|~6~|~06/BRO~|~test~|~~|~4665D9F3FC5402AC2CEA7A47A8C4DB6A5095C13A 93500~|~1~|~4~|~04/BRO~|~test~|~03 - Reconstruction - Added Capacity~|~A150CD9C8764CEDA55C1FB9B38ECA4C20ADBE241 93500~|~1~|~1~|~01/ENH~|~Test PID~|~01 - New Construction~|~B6D015C31A5EC4002115A2F7B4E64F7DDE0E4243 93500~|~1~|~2~|~02/BRF/123~|~test~|~~|~C8805A50638F4049E652DE36A0C1BBC50E9E9D5D 93500~|~1~|~8~|~08/ENH~|~test~|~01 - New Construction~|~C9F2E2BD73523C0D9163087E04E5777BE0EF777E 93500~|~1~|~3~|~03/BRO~|~wr4 wr~|~~|~FBB18E2B22B1C316E622C958DC45810575048A9B 92992~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Cos-SR 751-00.00 to 04.01~|~05 - 4R Maintenance - Resurfacing~|~73CABD4D3042F668FD8912060D7082FBB906E238 92992~|~1~|~2~|~02/NFA~|~District Preservation - 4PS7 (100% State) - No CAP - Resurfacing on Cos-SR 751-04.01 to 11.42;~|~05 - 4R Maintenance - Resurfacing~|~30FD13623D3796FF45C702197F9DE7FB25CF8758 101447~|~1~|~3~|~03/S<2~|~Federal 80%/State 20% Pavement outside City limits:RIC US42 12.46 to 12.72 (RT)RIC US42 12.80 to 12.90 (RT)~|~05 - 4R Maintenance - Resurfacing~|~F1D2ACE1D9D2EBACF2C4A0B83B539EF49CF7F608 101447~|~1~|~1~|~01/S<2~|~Federal 80%/Local 20% (Mansfield) Urbanized Area Inside Corp. Limit (Paving Items):RIC US42 11.67 to 13.13 (LT)RIC US42 11.67 to 12.46 (RT)RIC US42 12.72 to 12.80 (RT)RIC US42 12.90 to 13.13 (RT)~|~05 - 4R Maintenance - Resurfacing~|~0575844013303F7AFCC825559EDD5E21B88F2EC5 101447~|~1~|~2~|~02/S<2~|~100% Local (Mansfield): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): RIC US42 11.67 to 13.13 (LT)RIC US42 11.67 to 12.46 (RT)RIC US42 12.72 to 12.80 (RT)RIC US42 12.90 to 13.13 (RT)~|~05 - 4R Maintenance - Resurfacing~|~B05313A35334F24F696D346D09658CA45DE05400 101447~|~1~|~4~|~04/S<2~|~RIC-US42-11.960 SFN: 7002882 (ROCKY FORK CREEK)Preventive Maintenance: Treatment Type (48): Expansion joint repair/replacementMinor Rehabilitation: Treatment Type (60) Sidewalk repair/replace, (119) Approach (other)~|~13 - Bridge Rehabilitation~|~21EDDFBD5569C755597AE43452C90438F358CC36 109124~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 124 62.80.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~119AB7087FC851ABACE4BE634FFE41952345CB4E 89467~|~1~|~1~|~01/ENH~|~Construction of 0.68 miles of bike trail along the Little Stillwater Creek. A truss bridge over the creek. An additional 0.39 miles of trail will be signed on existing streets. Project within Dennison and Uhrichsville.~|~28 - Facilities for Pedestrians & Bicycles~|~E3F5C32AEAD600EBC2A2ED9C2D7127339F67F253 102508~|~1~|~1~|~01/NFP~|~Landscaping.~|~44 - Other~|~A98394D15C1A7A4E48142A7A5386DBE1814E412E 114953~|~1~|~1~|~01/NHS~|~Culver lining.~|~13 - Bridge Rehabilitation~|~60B7ED10FF28249138947803E42F8A0E346BD170 114953~|~1~|~2~|~02/STR~|~Culvert lining.~|~13 - Bridge Rehabilitation~|~DCC4CB6725B9E65A4D6A88866D14C967667E0364 114953~|~1~|~3~|~03/IMS~|~Culvert lining.~|~13 - Bridge Rehabilitation~|~9CA2A2E5A3415EE680D0C1C3B724681C059F501A 121430~|~1~|~1~|~01/STR~|~Plan split for WOO-64~|~66 - Resilience Improvement - Highway Project ~|~1DA14D19A8292FF8F989F72A1040FFE239447582 121430~|~1~|~2~|~02/SAF~|~Plan split for roundabout construction at SR-64 & Bishop Rd. Intersection~|~~|~421AADFDDEAFDD6309E90AC3340DE6AA919F7BD6 83968~|~1~|~1~|~01/BRO~|~Replacement of SFN 7803397 and 7803427 over RR at SLM 1.91 L&R~|~17 - Construction Engineering~|~C3847BA1FCC863787F2A39B9AB9EFDF172E864AC 83968~|~1~|~2~|~02/IMS~|~Total pavement replacement of TRU-IR80 from SLM 1.68 to SLM 2.18, in Weathersfield Township, Trumbull County, Ohio.~|~~|~E1A171ECDAD03297D6A9E3AF0C1D02F9EC491A0B 102567~|~1~|~1~|~01/NFA~|~TR 35 0.06 Pierce Road (SFN0830000)~|~10 - Bridge Replacement~|~53473698C353FA60F3747424771403E1EE2F82CE 80135~|~1~|~1~|~01/IMS~|~Plan split to program project, update after scope is complete.~|~13 - Bridge Rehabilitation~|~129E12AC04FA1F9B3F0D85B5580F480F35FBCAB7 116883~|~1~|~1~|~01/S5K~|~Resurfacing project in SCI.~|~05 - 4R Maintenance - Resurfacing~|~6F50F1D52B78520A88C6D1C080BA09B06F9BDE3A 102996~|~1~|~1~|~01/STR~|~Bridge deck replacement project. WAS 555 1930 (SFN 8404682). STP funds, 80% Federal and 20% State.~|~13 - Bridge Rehabilitation~|~FDE3E690143B351F98FC6DFAFAE86F8741B5E92B 89053~|~1~|~1~|~01/NHS~|~From Bridge No. HAM-71-0181, the Pedestrian overpass over I-71/I-471 to Bridge No. HAM-71-0226, Elsinore Pl Overpass This is Construction Contract (CC) OH-1 of the Brent Spence Bridge Project. The purpose of this project is to make temporary maintenance of traffic provisions for the routing of I-71 traffic onto I-471. The project will provide for two lane connections between I-71 and I-471. The temporary condition will be restored under CC OH-1A.~|~~|~676B913581045F6B85EB3081E216B369160F0C56 105508~|~1~|~1~|~01/STR~|~Created CO CO Contr 01 plan split 80/20~|~~|~04E834617AC9CCD4F9ACBDA729F83686DD6E4A5D 105508~|~1~|~2~|~02/STR~|~Created CO CO Engr 01~|~~|~5AAFE3109D8C7BCC11C508C787222A7E9DE120E9 112664~|~1~|~1~|~01/NHS~|~Repairs on UNI-33-2.71, FRA-104-12.48~|~13 - Bridge Rehabilitation~|~4264E30AACDC6F90641038C65B905076522D220E 112664~|~1~|~2~|~02/IMS~|~Repair beam damage due to an accident at Weber Rd over IR 71 (SFN 2508079)~|~13 - Bridge Rehabilitation~|~9E10E40D44739064823A3E8E2128710ECC6A10F7 98574~|~1~|~1~|~01/S>2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): LOR SR 83 SLM 10.500 TO 15.160~|~05 - 4R Maintenance - Resurfacing~|~B85BBA9A73F3E3102A8D5DB8CEF2678E3258FF56 98574~|~1~|~2~|~02/S>2~|~100% Local (North Ridgeville): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): LOR SR 0083 SLM 10.500 to 15.160~|~05 - 4R Maintenance - Resurfacing~|~EF1824F36D20A3565307ABB46268DE2B70D0B46F 98574~|~1~|~3~|~03/NHS~|~Bridge Work: (Patching top of BackWalls)LOR 0083 - 10.75 SFN 4708431~|~13 - Bridge Rehabilitation~|~B73C8CF3A76618A5248CDAFF982F73FC5BA65A86 114492~|~1~|~1~|~01/NFP~|~FY 26 Overlay~|~05 - 4R Maintenance - Resurfacing~|~1C3E51C06D073BD48C2A2EB77530FC52E9827963 93036~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) Cos-SR 93-03.52 to 11.94; 2) Cos-SR 93D-00.00 to 00.28;~|~05 - 4R Maintenance - Resurfacing~|~11BBFC072962E4E3ACD8152A42FADC166C494AC8 93036~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~BB7B86B250C2572C92B4FCA2354C1D2CBB990225 127065~|~1~|~1~|~01/S50~|~Construct left turn lanes on SR 315 at Home Rd~|~04 - Reconstruction - No Added Capacity~|~1D992DBACD46D2F812F96D5F3F6522C80479BA3F 93360~|~1~|~1~|~01/IMS~|~Construct noise wall on I-270 from Livingston to Noe-Bixby~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9AA10ECACAEF8BD64C6E10E05C9E900307C1153C 107826~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~6CE73C9AF6AD2DA56B9A4AC86E56B400C7F582C7 107826~|~1~|~2~|~02/S>2~|~Urban Area (>200,000) plan split~|~05 - 4R Maintenance - Resurfacing~|~99F21104BF7CA9EB9CDB140538B4898B549D47A9 102673~|~1~|~1~|~01/S>2~|~Pavement reconstruction and adding TWLTL between 34th Street and Southgate Shopping Center in Canton Township, Stark County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~2487ECDE1AAAEE571E5F69D7DD9407B03AF6EF38 126410~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with Repairs HUR-162-5.960 to 8.066Bridge maintenance included~|~05 - 4R Maintenance - Resurfacing~|~83197B4AE2F252A7DA254FF72E18A2DD9249985F 126410~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs HUR-162-0.00 to 5.960; HUR-162-8.066 to 8.905Bridge maintenance included.~|~05 - 4R Maintenance - Resurfacing~|~E04CC996DF4D16D612DD68ED8CC3508833127E93 100654~|~1~|~1~|~01/STR~|~Spot paving various locations throughout District 11.~|~05 - 4R Maintenance - Resurfacing~|~2DF96D7727717E2C3AC073805247564FADBBEC44 93759~|~1~|~1~|~01/ENH~|~Construction of multi-purpose trail on various routes in the City of Kent.~|~28 - Facilities for Pedestrians & Bicycles~|~C87C1C011CCA7EA8236C9B88153E2F3C657CC083 122594~|~1~|~1~|~01/ERD~|~Repair up to 8 areas of roadway pavement distress impacted by slope instability.~|~66 - Resilience Improvement - Highway Project ~|~488304BFCCD817CD21334C54601792736A266EDE 110956~|~1~|~1~|~01/SAF~|~Construction of new sidewalk, addition of ADA compliant curb ramps, and solar powered crosswalk signs on Willow Street from 5th Street to 6th Street. Removal and replacement of existing sidewalk on the south side of Spring Street from 5th Street to Broadway Street.~|~~|~1C1E63BBE7CBD881F4F0CA9D7B50AB04C842B54A 93473~|~1~|~1~|~01/SAF~|~HEN-6 guardrail upgrade from SLM 5.4~|~21 - Safety~|~93AD3DBE177908F4D929AE9984B12B64EAD7C319 107407~|~1~|~1~|~01/BRO~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - BR Eligible - Rehabilitation of SFN 4505115 carrying SR 79 over Rocky Fork~|~13 - Bridge Rehabilitation~|~A08F998ACEFC7E5F10D972650A91A839A281BCA9 109358~|~1~|~1~|~01/S>2~|~Demolition of buildings along new US 62 alignment.~|~44 - Other~|~64FDCDF8B5FD7D528EAFA280817B9CC95F56BEA2 94768~|~1~|~1~|~01/CMQ~|~Widen Middle Urbana Road to accomodate center left turn lan on Middle Urbana Road from Villa to SR 334.~|~04 - Reconstruction - No Added Capacity~|~DD6BDF49455F8B21E2501A1A65B9D50B709380B2 94768~|~1~|~2~|~02/NFA~|~Water and sanitary work~|~04 - Reconstruction - No Added Capacity~|~E35567316172CA40D3ADC0E0373C8AF6E1A22716 101328~|~1~|~1~|~01/NFP~|~Bridge replacement.~|~10 - Bridge Replacement~|~417ECE5ABCA4A38C4A5D9EAC3665E93CB291D9A2 118851~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 2.55 to SLM 12.12~|~05 - 4R Maintenance - Resurfacing~|~2FB195EDD6CC0DB6052FEB61B31A90A39E2C8300 118851~|~1~|~2~|~02/S5K~|~Resurfacing SR 9 from SLM 12.12 to SR 45~|~05 - 4R Maintenance - Resurfacing~|~6D14CB46647F0122DA0315444419FF4BAADCAA61 97879~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Anticipated TRAC Funding - No CAP - construction of interchange at SR 161 and Mink Street Road.~|~01 - New Construction~|~DE22416A030919B95225A4CB38A8B4930A03FE32 101105~|~1~|~1~|~01/STR~|~AC Overlay without repair~|~05 - 4R Maintenance - Resurfacing~|~84BD00389B9770A5A6C0DCCBF40EB826BD7A764A 101105~|~1~|~2~|~02/S<2~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~DE3512A922B35404E1BB1A6267268D0BC01B9332 98054~|~1~|~1~|~01/NFA~|~ODNR Bridge Repair~|~13 - Bridge Rehabilitation~|~E555C167187C4EB24FB32E25864853ECF766C3D2 125399~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS TR 319, SFN 8434751.~|~10 - Bridge Replacement~|~EA398CF12D70B43A1DE28A0A746D5BAF265CD816 93174~|~1~|~1~|~01/MPO~|~Resurfacing with 1 1/2" of Item 448 asphalt on CR 25A from the Troy Corporation Limit to the Piqua Corporation Limit with enhanced pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~E440922A8CAE1D60F2D438AAB7A82949BC32A72A 93174~|~1~|~2~|~02/S<2~|~Resurfacing on CR 25A SLM 12.402 to 13.349 work non-performed from PID 87534 paid with District Allocation.~|~05 - 4R Maintenance - Resurfacing~|~FABD920D76D6EBBDD117DB633B55DEAD27ACD70D 124747~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~7E640C8FC4B27C139775E3A6D7C1BC910F30FCB5 109640~|~1~|~1~|~01/SAF~|~Safety plan split~|~21 - Safety~|~15172BDBE73DCADD92117E42F9DD8F7E2373677B 82933~|~1~|~2~|~02/BRO~|~SFN# 5000874, bridge over Indian Run...BR eligible...~|~10 - Bridge Replacement~|~50346BAEAB81D6A50C232CDCD2F051EC686B728E 82933~|~1~|~1~|~01/STR~|~SFN# 5000963 over branch of the Little Beaver...~|~10 - Bridge Replacement~|~FF745D7E317E0DB7F55AC28EFCEFA3113CCC24C6 94155~|~1~|~1~|~01/IMS~|~Extrusheet replacement on interstate locations~|~21 - Safety~|~72AB56D8710127B3EC0AF65849B2863E2C82D9A2 106986~|~1~|~1~|~01/NFA~|~The Mason - Montgomery Road widening project will create an additional lane on northbound Mason - Montgomery Rd from Parkway Drive to Socialville-Fosters Road.~|~01 - New Construction~|~07D391C4CF662F5384E6D13678B7C496442ED29D 101555~|~1~|~1~|~01/S<2~|~Resurfacing project using an asphalt overlay treatment. HOC CR 33A 3.97-5.17. Work also includes storm water utility improvements. Funded 95 federal/5 local.~|~05 - 4R Maintenance - Resurfacing~|~3F13013BBDBF401C5A83116CDEA53FCEA92FE1E3 107727~|~1~|~2~|~02/S<2~|~Culvert work on RIC SR 0039 11.147.~|~04 - Reconstruction - No Added Capacity~|~B0630487BC9DF51782229A78B1A8AC5AD83972D7 107727~|~1~|~1~|~01/STR~|~Culvert work on HUR SR 0061 11.97~|~04 - Reconstruction - No Added Capacity~|~45B739C2A7D0A8B183186ADBBBF6EA9B059C32AE 92619~|~2~|~2~|~02/MPO~|~Plan Split added for 100% City items.~|~05 - 4R Maintenance - Resurfacing~|~04A5B86394FEDF0488A081DFC556439A91390472 92619~|~1~|~1~|~01/MPO~|~Mill & Fill~|~05 - 4R Maintenance - Resurfacing~|~247EFCAE0C0042742EC04AD639ED53FC0B7EBAE2 109837~|~1~|~1~|~01/STR~|~HIG 247 0.00-11.13~|~05 - 4R Maintenance - Resurfacing~|~B3F445A47C4DF1832A61A387AAD378E955960564 109837~|~1~|~3~|~03/S<2~|~HIG 138 15.06-15.35 (Hillsboro)80/20 local match~|~05 - 4R Maintenance - Resurfacing~|~62E4D3AAD6C33A07F1C6C0925B92B6CB651306C5 109837~|~1~|~4~|~04/STR~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~10E5849E5F85DD71527CE9308EE8E28B71954220 109837~|~1~|~2~|~02/S<2~|~HIG 247 11.13-11.74~|~05 - 4R Maintenance - Resurfacing~|~E7319FDFD97FC393797C49C02806E2FEE5E5CA90 109837~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~9584C95200ADDD85826F19D35FB26F9C3EE036CD 100752~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. GAL 553 0.00-2.34. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~1BED5AC3B08C93B0990B09563216EBAB5C5B9579 122206~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-B~|~~|~FFCB5E59291EDE18F6548E7044E25C09349485DF 92586~|~1~|~1~|~01/STR~|~At the inersection of SR124 & CR39 (Mulga Road), this project is for the preparation of the Army Corps of Engineers 404/401 individual permit and the purchase of RW for mitigation purposes. Using Task Order 92152.~|~20 - Environmental Only~|~E203FBA482612129F8540C1746D08D89086E328C 88220~|~1~|~1~|~01/S>2~|~Resurface the existing roadway from Tipp City North Corporation Limit to Troy's South Corporation Limit. on CR 25A 4.38 to 5.83.~|~05 - 4R Maintenance - Resurfacing~|~E0BA8EA2DD9FDE6605B7A73E3AF2AF5129123D1C 83382~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Realigning roadway to mitigate mutliple landslides.~|~04 - Reconstruction - No Added Capacity~|~45484D4E593673D05EB97EA7524259C3BF47D5CA 114735~|~1~|~1~|~01/NHS~|~FY25 Overlay.~|~05 - 4R Maintenance - Resurfacing~|~FD6043AC60D0FEBE5F6416C326A4F99BD5C031F0 108548~|~1~|~1~|~01/S>2~|~2" mill and fill in the City of New Carlisle - UPP.~|~05 - 4R Maintenance - Resurfacing~|~CC44439A6A226862C688AD5F0AEC52A737ECF00D 105070~|~1~|~1~|~01/NFA~|~The County will widen Johnson Road to accommodate a North Bound Left Turn Lane and a South Bound Right Turn lane into Honda's Gate R entrance. In addition, widen SR 739 to accommodate a North Bound Left Turn lane into Honda's R&D entrance.~|~01 - New Construction~|~F7EEB4C6E873704DBCFE8D53DEABEBF4FEB186EF 88834~|~1~|~1~|~01/IMS~|~This split is for paving work on the interstate system. Funds are from the District Preservation Program.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2DFEF38B9E3A156A87BD50F222D0EAC77C5BDADB 116259~|~1~|~1~|~01/S>2/KYTC~|~Bridge split.~|~47 - Bridge Preventive Maintenance~|~E7FAA0BF740EEDCC44405C956C069469720DEDC3 90875~|~1~|~1~|~01/STR/BALT~|~"01/STR/OT/BALT" - Village of Baltimore SRTS project - installation of new sidewalks, curb ramps and flashing lights along SR158 within the Village. SRTS CO funding cap of $351,386.00~|~28 - Facilities for Pedestrians & Bicycles~|~A89C3AC471EA0C862018C843BE0C0BC1DD91E7B6 102512~|~1~|~1~|~01/NFA~|~The CIC is constructing 650 feet of new two-lane road to be called Southwestern Blvd~|~01 - New Construction~|~E368BAF6F3CA03A274B6F518E1D6B9F8F0360292 100461~|~1~|~1~|~01/STR~|~HIG 73 0.00-7.08~|~05 - 4R Maintenance - Resurfacing~|~A4C376666632FF0C30C42CE43CF14BBCCA39CFB3 100461~|~1~|~2~|~02/S<2~|~HIG 73 7.08-7.41~|~05 - 4R Maintenance - Resurfacing~|~0E3CB87192E551E13A80A8311E493187A3444A7E 96345~|~2~|~2~|~02/MPO~|~100% local items~|~~|~80E61EF3BE4606F42377E262BB6968BCF3F0841D 96345~|~1~|~1~|~01/MPO~|~eligible STP intems thru the MPO~|~04 - Reconstruction - No Added Capacity~|~FA0A197BF06C3A566EEDD892A17F35D4D4DFD75A 98717~|~1~|~1~|~01/BRO~|~Bridge replacement MED-CR 99-0.80 (Shaw Rd).~|~10 - Bridge Replacement~|~CA1938FF68138D33E75B2C35FA1C9A8380E03D85 103344~|~1~|~1~|~01/S>2~|~Resurfacing of Riley Boulevard from South Main Street to Second Street.~|~05 - 4R Maintenance - Resurfacing~|~2639BF2343EC7A31D9DC3E2C1B4F92EE3CEA6DA4 92743~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 21.17-21.23. 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E787133652EE0CD9EEAE4D3BDF8EA4F617AC5EA3 97624~|~1~|~1~|~01/NHS~|~Resurfacing on BEL-7 from 2.26 to 6.02, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~21E9EF0970549B3E94248D3B38C32CCFAC78F53B 97624~|~1~|~2~|~02/STR~|~Resurfacing BEL-149 from SR 331 to HAS Co. line including asphalt overlay, asphalt repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~98A11DE3E3F84437B5560E9841429CCCC36422BB 121427~|~1~|~2~|~02/STR~|~Guardrail STP Rural~|~21 - Safety~|~35B4A97422B080EAA2AA5AAB0227D5DA6B7AFA08 121427~|~1~|~3~|~03/NFA~|~Guardrail - Not on Federal Aid~|~21 - Safety~|~485DAC95FC40DB1350ABEEC0347E4972C3F36F50 121427~|~1~|~1~|~01/S5K~|~Guardrail replacement STP Rural 5,000 - 49,999~|~21 - Safety~|~92B3FA7054018344075144D9DDE6A8CBDB7D81C6 113361~|~1~|~1~|~01/IMS~|~Widen and reconstruct various locations.~|~03 - Reconstruction - Added Capacity~|~C82422666734F563B8B1DE428FB81DE3201AA4FB 113361~|~1~|~2~|~02/IMS~|~Replace, remove and widen bridges.~|~10 - Bridge Replacement~|~E38B3E2F1FB9A20B5A3DDE8204E9E6B7877B0336 113361~|~1~|~3~|~03/S>2~|~This plan split covers all non-interstate roadwork in the project~|~~|~4E86CA40909A6CFEDA27AD764881371D4E518F82 113361~|~1~|~4~|~04/IMS~|~This plan split addresses the additional superstructure width that is being provided on the Ezzard Charles bridge over I-75 (aka bridge caps). The substructure will be paid under the structure plan split. ~|~10 - Bridge Replacement~|~742B53BB1A3E44874144E29C301BB277871D0BEA 109689~|~1~|~1~|~01/STR~|~Install and upgrade existing guardrail on various county roads~|~21 - Safety~|~C1F6DC18E937F7C7D732487B23480BE0B53449C1 22220~|~1~|~1~|~01/NHS~|~Plan split for all pavement items.~|~05 - 4R Maintenance - Resurfacing~|~B67D335BE6621A867AC5BA75361B59AAE9C00B4E 116297~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~3C030691B82FB8151A44CDDAE7D3A857B90CC2C1 124631~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to install and upgrade current pavement markings on various county roads.~|~21 - Safety~|~2C5FB92B7D0BC45592F43D49AE6ADA7BA6D1113E 107964~|~1~|~1~|~01/IMS~|~Crack seal and minor pavement repairs on: CLA IR 70 SLM 0.51 to 10.00~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5DE7A8278313D97EDA223ECE9F02F7E5B10478D1 88514~|~1~|~1~|~01/STR~|~Resurface SEN SR18 30.5-34.73~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F54F8C8378C87CA861AC3A4ADBD561B886CD288C 92381~|~1~|~1~|~01/SAE~|~100% Safety on various routes in columbus Area.~|~44 - Other~|~6F9639C307F94D8734CB3156C36C29B06CF31695 88728~|~1~|~4~|~04/NHS~|~80/20 4PF7/4PS7 Fed/State - Non urban paving pavementRIC-039-13.15 - 13.16 Rt~|~05 - 4R Maintenance - Resurfacing~|~028FB2F2FA963E0383EB7BB52BD1422400C91B86 88728~|~1~|~5~|~05/S<2/MSFD~|~100% City of Mansfield Items~|~05 - 4R Maintenance - Resurfacing~|~4B412EF8D5F22CE3CE7B3A6F8CCF06599AA86A13 88728~|~1~|~2~|~02/NHS/MSFD~|~80/20 4PF7/4BG7 Fed/City NHS segments within the city of Mansfield RIC-013-14.41 - 15.14RIC-039-13.15 - 13.16 Lt / 13.16 - 13.82 / 15.17 - 15.37RIC-042-11.38 - 11.66~|~05 - 4R Maintenance - Resurfacing~|~51BF77ECD0B63E601826713B339DF4E105E94402 88728~|~1~|~6~|~06/S<2~|~80/20 4PF7/4PS7 Fed/State - Bridge Work~|~13 - Bridge Rehabilitation~|~60A279BED1B1F95CB275B9712EB36CD0E71B726C 88728~|~1~|~1~|~01/S<2/MSFD~|~80/20 4PF7/4BG7 Fed/City - Non-NHS Urban PavingRIC-039-13.82 - 15.17 / 15.37 - 16.80RIC-545-00.00 - 01.14 / 01.14 - 01.19 RtRIC-430-02.19 - 05.41 / 05.69 - 05.70~|~05 - 4R Maintenance - Resurfacing~|~A86848A565861E164415D9A0183F6A5C32600990 88728~|~1~|~3~|~03/S<2~|~80/20 4PF7/4PS7 Fed/State Non NHS Non UrbanRIC-039-16.70 - 16.80 RtRIC-545-01.14 - 01.19 Lt / 01.19 - 01.44 ~|~05 - 4R Maintenance - Resurfacing~|~FFA8AFAC7E85C6C1FE21C302666DC3A8E2DE97E0 100606~|~1~|~1~|~01/S<2~|~Resurfacing TUS-39 from SLM 15.77 to TR 314, including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~9C2550D6B596E9F01445736E338BC15F10B82090 100606~|~1~|~2~|~02/STR~|~Resurfacing TUS-39 from TR 314 to Roswell~|~05 - 4R Maintenance - Resurfacing~|~E34554143614E21E5E5B13597D369298A4B6D2B6 116772~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~ED8C8629A3BE4353413FB19D50496C6EF0D8AE9A 100415~|~1~|~1~|~01/NFP~|~Township is adding an auxiliary lane on Galbraith Rd with right turn to US-22/3 and intersection improvments at North Creek Dr.~|~01 - New Construction~|~649F8AC963B3F24BB4F809F3A3BF009426E1AA5B 104803~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings~|~21 - Safety~|~12B3A4B7400ECDF83E3ABB4086005C2B9900A05C 107498~|~1~|~1~|~01/STR~|~Resurfacing COL-164~|~05 - 4R Maintenance - Resurfacing~|~4E5B525CFD588C12EB9C848BE598EF729C0EA28E 87714~|~1~|~1~|~01/IMS~|~District Allocation 90/10~|~05 - 4R Maintenance - Resurfacing~|~DDB1DBF197B07260C536D3D49C68152D428A03C1 87714~|~1~|~2~|~02/IMS~|~District Allocation 90/10~|~13 - Bridge Rehabilitation~|~B839185F488C9DB670413BCF47B528F90080BB07 87714~|~1~|~3~|~03/IMS~|~Rest Area Work - 100% 4BR7~|~44 - Other~|~2689F4B4B07362D6CEF806B3906A3A4EA7ABB0AC 87714~|~1~|~4~|~04/IMS~|~Storm Water Mitigation Items~|~05 - 4R Maintenance - Resurfacing~|~8C485AD4D371F61AC460514077F1D6311D37E13C 125554~|~1~|~1~|~01/SAF~|~Construct a single lane modern roundabout at the intersection of Trenton Oxford Rd (SR-73) and W Elkton Rd (SR-503) in Butler County.~|~21 - Safety~|~2092EBC9458FEC10C7332BD1470D4D5D84084D36 83085~|~1~|~1~|~01/STR~|~HIG 50 (0.00-7.42)HIG 134 (12.28-13.99)~|~05 - 4R Maintenance - Resurfacing~|~911CBA9505E25D6846CAC141CE06469F261DCF6D 92422~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; All work is in this split. Funding is 100% state funds SAC 4PS7.~|~21 - Safety~|~556150CE63D90904AD3D4AB4EE6AD3520541C37F 116707~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~89B862E7F7DDE3E4AA9B4D83F6E64D5FC227CAE8 116707~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~41E55B5FCAF50A03E6890A77ABFFDE3A7F59811E 85137~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 123 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~08488981F91C3CCD943598E6D6F8BF429118DA69 85137~|~1~|~2~|~02/STR/BLAN~|~OPWC funded items inside the Village of Blanchester. Including curbs, gutters, sidewalks, and catch basins.~|~05 - 4R Maintenance - Resurfacing~|~C5DB5417302BD64DFAD1CF319D94BF5469544854 102653~|~1~|~1~|~01/NFP~|~TRU Canoe City MetroPark parking lot resurfacing.~|~44 - Other~|~57F11BDDF1F39E7B9B6665FA32860C6BFA1814C9 109752~|~1~|~1~|~01/STR~|~01/STR/PV : Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~AEDEB595FAA56DFD6D2DE488A0ECCD181EAC8753 100575~|~1~|~2~|~02/S<2~|~ROS 41 14.23-14.92~|~05 - 4R Maintenance - Resurfacing~|~87BC3910B8E0489FF62110E74A8C29C975C16151 100575~|~1~|~1~|~01/STR~|~ROS 41 3.69-14.23~|~05 - 4R Maintenance - Resurfacing~|~691C7C31D959AD1F8A753D06501C965C9CC617AA 100575~|~1~|~3~|~03/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~82C41FDE5E3EBF3E220816040E7285B8DFE782FE 100575~|~1~|~4~|~04/S<2~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~140AD5F2F24E472D004D4089D13090FFAC822153 124685~|~1~|~1~|~01/SAF~|~Safety improvements.~|~04 - Reconstruction - No Added Capacity~|~AC345383507929C5E2FA6BFAC4827789C7A6018C 110194~|~1~|~1~|~01/S>2~|~Urban paving - 2" mill and fill with asphalt concrete on: MOT-201 SLM 2.18 to 3.88~|~05 - 4R Maintenance - Resurfacing~|~1FDD21AECB24A90F8BEF387546B84ECB6C2BAE3E 110194~|~1~|~2~|~02/NHS~|~Urban Paving - 2" mill and fill with asphalt concrete on: MOT-202 SLM 3.60 to 3.72 in the City of Dayton~|~05 - 4R Maintenance - Resurfacing~|~ABF3A3FFB9AE93E244EA087E7532A537B65A3691 110194~|~1~|~3~|~03/NHS~|~Urban Paving - 2" mill and fill with asphalt concrete on: MOT-202 SLM 2.06 to 3.60 MOT-202 SLM 3.72 to 4.35 Urban Paving - 1 3/4" mill and fill with superpave asphalt MOT-835 SLM 0.18 to 0.62. City of Riverside~|~05 - 4R Maintenance - Resurfacing~|~F8F4BDC66FF6328EF9F7D6ABB0EC73C78C9F4748 110194~|~1~|~4~|~04/S>2~|~Replace traffic island on SR 835 (change order)~|~05 - 4R Maintenance - Resurfacing~|~66D456DF54D11811D0F4C58254E2FBDA0E973E7A 101283~|~1~|~1~|~01/STR~|~All work associated with resurfacing on SR-49~|~05 - 4R Maintenance - Resurfacing~|~722B28DA77428C3C83CFC88FB48146ACBBC67CB8 101283~|~1~|~2~|~02/SAF~|~Plan split for center line rumble stripes for US-6~|~21 - Safety~|~8E29BED9EC5CF6B6B2C57480AFF7D591B2978A33 101535~|~1~|~1~|~01/MPO~|~Repair and resurface East 55th Street~|~05 - 4R Maintenance - Resurfacing~|~C0CB3573829EDF151568B4FAEF118730429040FF 116676~|~1~|~1~|~01/STR~|~This split is for the portion of SR 292 that is outside the Kenton Urban area.~|~05 - 4R Maintenance - Resurfacing~|~49D376F9991CFFEC5D1EBCBACC51739D60B9D9EB 120083~|~1~|~1~|~01/SAE~|~Roundabout construction on SR 46 at New Rd.~|~21 - Safety~|~473399ACBA6785720B26E65413044F32E4DE615F 120083~|~2~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0DB9121412F9EF8594B9463DD472CFE65335F0A5 110511~|~1~|~1~|~01/SAF~|~Intersection improvement project. MRG 60 11.72-11.78 and MRG 78 18.90. Safety funded 90 federal/10 state.~|~21 - Safety~|~518B7EA38DA78DB9DF9F551AB79AB0F966A71635 105024~|~1~|~1~|~01/CMQ~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 22.38-24.91, WAS 26 0.00-0.62, WAS CR 50 1.06-1.79, WAS CR 350 0.00-0.62, WAS CR 2001 0.00-0.08, 0.36-0.51, and WAS CR 2004 0.00-0.33. Funded 80 federal CMAQ/20 local.~|~21 - Safety~|~F6D7BFC1AFCD4B902E82FE22F5BDBDB429EBA7E0 105024~|~1~|~2~|~02/NHS~|~Extra signal controller paid for by City of Marietta. 100% City funds. ~|~~|~9236887B4FAF7482CF91B154F822CE4AC5CF748B 114284~|~1~|~2~|~02/IMS~|~Plan Split for mowing in MOT Co~|~44 - Other~|~4E2C36E9620AE11844E0EDC9B8632B82283D85D1 114284~|~1~|~1~|~01/IMS~|~Mowing contract in D8~|~44 - Other~|~6362C78204DAE1C14052EB779B4EAAC659B477F9 99881~|~1~|~1~|~01/NFA~|~Summit County Engineer.~|~05 - 4R Maintenance - Resurfacing~|~D6EF555879712801319509894C1873F503989AB7 104718~|~1~|~1~|~01/NHS~|~Reconfiguring IR 480/SR 91 to a diverging diamond interchange (DDI).~|~~|~4BE99B95064DF2822A4E6212A5A8DF8FCE747252 94461~|~1~|~1~|~01/STR~|~District Wide Raised Pavement Markings~|~21 - Safety~|~9A3CBBAE4FE7BBF1A30AB14A6916AA4DA73BBA41 102349~|~1~|~1~|~01/STR~|~microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~019EF12CDDA4D435F216B6BE13DA65826AACB35B 94063~|~1~|~1~|~01/NHS~|~Preventive Maintenance Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~3B133D6C3F4A4DC1E421F7F458FBAD1ABB345035 98931~|~1~|~1~|~01/IMS~|~District Wide Raised Pavement Markers~|~21 - Safety~|~517542F2D8D26AE6E4525AA1A87D55BBD1241CA6 125448~|~1~|~1~|~01/NHS~|~Resurfacing NHS~|~05 - 4R Maintenance - Resurfacing~|~1A7AD284E7120612240A811D5D598A1BFC3B544E 125448~|~1~|~2~|~02/S5K~|~Resurfacing - STP 5,000 - 49,000~|~05 - 4R Maintenance - Resurfacing~|~2D451DE01E292EB9A128E7AE5198613ECCF37346 125448~|~1~|~3~|~03/STR~|~Resurfacing STP Rural~|~05 - 4R Maintenance - Resurfacing~|~0C1D13E6429DFEEF69C50CDE7726131BD5A01319 105083~|~1~|~1~|~01/NFP~|~This is the district's long line pavement marking maintenance project.~|~21 - Safety~|~D4AD7A757F65E4167548A31512CF889F293C6256 91757~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a fine graded polymer treatment on MEG 33 4.26-10.02. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5A8D8DC6A75743E5C23843A1870B57BF447CA6E1 91757~|~1~|~3~|~03/NFP~|~Resurfacing of the Meigs 10-31 & 10-32 rest areas. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D9ACF1679A5D12CBFCD04652D293B3E2E8CC78DB 91757~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment on MEG 124 20.66-22.08, MEG 833 4.61-4.70 and an asphalt overlay treatment on MEG 124 22.08-22.36. Urban other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDEC1CAE83398CCCEDAE5E18C643E3A233D71DD1 106251~|~1~|~1~|~01/NFA~|~The City will reconstruct as well as widen in areas along 1200 feet of Chamberlain Blvd as well as widen the intersection of Chamberlain Blvd and Parrish Rd.~|~01 - New Construction~|~A5BB7570CEE65EB1125EDADB57470E5ECC3C30F1 121344~|~1~|~1~|~01/NFP~|~Created for ODOT TID Funding~|~~|~0436D1404CC52AFC6054F2EE7874150541B83DBD 96791~|~1~|~1~|~01/IMS~|~Emergency Type A mill and fill reactive MIA IR 75 2.60~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ECF8D5DBE26D2300FB7D8AA22BE43DFCE7E288AD 125700~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~ACBD7A31212FFDFE67FF33225D596A94F149F0ED 125700~|~1~|~2~|~02/SAF~|~MRG 78 Shoulder Widening. 100% State Safety funded. ~|~21 - Safety~|~65514B7080B3CAA06CD3EBA6CB2F74AEE68522F7 116187~|~1~|~1~|~01/STR~|~Bridge replacement~|~10 - Bridge Replacement~|~5685AF905D48117453CF07C9F63B140033AF8C89 97282~|~1~|~1~|~01/NHS~|~Split for erosion work~|~44 - Other~|~6B888ABFA47CA1D93174B2C911D2D432ED63948A 97311~|~1~|~1~|~01/IMS~|~Plan split for guardrail upgrade work~|~44 - Other~|~691AB1D9FA26F32C7B10242EAC50B8552C6109BD 97311~|~1~|~2~|~02/NFP~|~Guardrail repair work at 100% state~|~44 - Other~|~964839331103F14DB1746B9E6C9121CE0293281D 114992~|~1~|~1~|~01/IMS~|~Plan Split for the work included in the project~|~04 - Reconstruction - No Added Capacity~|~26F85B293EC91DAF3DE45D55FD0567399C98B46E 114992~|~1~|~2~|~02/SAF~|~Plan Split for the Safety funded portion of the R-WR striping: the groove and enhanced optic.~|~21 - Safety~|~626F5280D43EBEAED4D7D973DB93CBB2B8893F11 80970~|~1~|~1~|~01/ERD~|~Earmark at federal participation rate of 100% using TRC.~|~~|~1603F722445FB58041314CDE485DB314E8E58460 94060~|~1~|~1~|~01/NFP~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2013-2014 used for Construction Inspection services.~|~17 - Construction Engineering~|~C74740ABD39562E2593664CD842267E310F02325 117515~|~1~|~1~|~01/SAF~|~Safety - traffic signal~|~21 - Safety~|~C6965F8886D0243FCE95D93ED8DBE85EFF7F6249 77646~|~1~|~1~|~01/STR~|~Rural other federal aid culvert replacement project. WAS 7 3979, SFN 8400431. Replace existing 120" CMSPP with box culvert.~|~10 - Bridge Replacement~|~5848B500E9CF8FC8220C322D737A43F3F7A66B5B 104880~|~1~|~1~|~01/STR~|~BRO SR 774 10.50 (SFN 0804290)~|~10 - Bridge Replacement~|~196D9C59D22075B0CF9C9A2E645A54D969086F57 126826~|~1~|~1~|~01/S>2~|~Plan Split for pedestrian and safety improvements on Chardon Rd~|~28 - Facilities for Pedestrians & Bicycles~|~E7E5A9F3267E94E7AE0C96FC676C5AA2D11A00CB 124317~|~1~|~1~|~01/NFA~|~Construct parking lot~|~~|~8706E0A352B28200CBD990E1759F31C5D5E2B019 125671~|~1~|~1~|~01/STR~|~Plan split for chip sealing Rural routes. ~|~05 - 4R Maintenance - Resurfacing~|~E7E1BCD50DD25ED06A028A5C1F44A0AC07642ACE 127023~|~1~|~1~|~01/SAF~|~Safety funded pedestrian improvements~|~21 - Safety~|~4E2BE0D97A651B7EB4D8FC1186E8E98DCBB47C87 127023~|~1~|~2~|~02/ENH~|~TAP funding for Shared Used Path~|~28 - Facilities for Pedestrians & Bicycles~|~13528E2958EEA4E11FFDD7CDF3F03E7C7D2063F6 125667~|~1~|~1~|~01/IMS~|~Plan split for the resurfacing on the interstate sections~|~05 - 4R Maintenance - Resurfacing~|~F32FAAF122686062C4C6290C8A2C718783C31425 91351~|~1~|~1~|~01/SAE~|~Revise the alignment of the eastbound left turn lane at Dorset/Archer, and rebuild and upgrade the traffic signal. Install dilemma zone protection, ADA ramps and pedestiran count-down signals at the I-75 interchange.~|~21 - Safety~|~07713B57F811EBA8BBA417C68EBF83E43CC64327 108245~|~1~|~1~|~01/CMQ~|~complete street work eligible for federal-aid~|~~|~78A1460643C025B0902A5E172EC6ECE0DF6C4503 108245~|~1~|~2~|~02/NFP~|~Split for unfunded construction costs.~|~~|~141E70CDB2C63422ED0F6B7AF813139AA2985230 125347~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FE11CB23A86CB1D6BC2509E65654F78650C1DA66 124892~|~1~|~1~|~01/NHS~|~Culvert liner. MOE 7 14.35, CFN: 5600480.~|~04 - Reconstruction - No Added Capacity~|~47F96A436BFD0455623CF535D2CBA6F495A971CD 103070~|~1~|~1~|~01/NHS~|~Block~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A866375594A5670CB3793AF069419203890BB563 120375~|~1~|~1~|~01/IMS~|~Rockfall hazards mitigated by cutting back the slope on WAS 77 17.13-17.34 RT. Includes WAS 77 17.15-17.28 LT.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D9CF31DB224D7CCE5DCE90B651B1DE4CB5465AB2 101299~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~913BCDE7B8FB840DE21C9C27B22758325E5C62AD 105228~|~1~|~3~|~03/BRO~|~Plan split for bridge COL-30-18.947~|~13 - Bridge Rehabilitation~|~30B7E0E7C29E38F0869B11AFD92E7B0BE6E6DD70 105228~|~1~|~4~|~04/BRO~|~Plan split for work on bridge COL-30-24.488~|~13 - Bridge Rehabilitation~|~C47218C2874C523F81F1F0668E80E10BD07CF5AC 105228~|~1~|~1~|~01/S<2~|~Pavement rehabilitation of US 30 from Lisbon to SLM 19.74~|~04 - Reconstruction - No Added Capacity~|~E0818AFE4A745C3ADC7AEBCA0828D57A4EBF88A4 105228~|~1~|~2~|~02/STR~|~Pavement rehabilitation of US 30 from SLM 19.74 to SR 11~|~04 - Reconstruction - No Added Capacity~|~06F2EA0AA110BD294B33DC196B0DED05A55D085F 95313~|~1~|~1~|~01/NHS~|~Install a left turn lane for NB MEG 7 5.00-5.80 traffic. Relocate MEG 143 0.00-0.12 intersection south to avoid bridge widening and to improve sight distance. NHS route funded 90 federal/10 state safety funds and 80 federal/20 state preservation funds.~|~21 - Safety~|~D2BB4C6312B4EFEFCE5984242EABFB629BF033F1 95313~|~1~|~2~|~02/STR~|~Install a left turn lane for NB MEG 7 5.00-5.80 traffic. Relocate MEG 143 0.00-0.12 intersection south to avoid bridge widening and to improve sight distance. Rural route funded 80 federal/20 state preservation funds.~|~21 - Safety~|~079BDEBEA7D40FFF182DC367E29EDB92102D73FC 105650~|~1~|~1~|~01/SAF~|~plan split~|~17 - Construction Engineering~|~B58B65A957EF4B6E6EAA4BF83CAAE684E3C7D000 102332~|~1~|~1~|~01/NHS~|~Replace decks on four structures~|~13 - Bridge Rehabilitation~|~09FDE88E32A13EE59510ADC768ED8792174B0D9D 102332~|~1~|~2~|~02/SAF~|~Install recessed wet reflective pavement markings~|~21 - Safety~|~37172C1D0C5693AAC80B157E475D5DF1953C976B 88942~|~1~|~1~|~01/BRO~|~The project calls for a complete replacement of the existing boxbeam bridge with a new single-span box beam bridge. The existing bridge (BEL-9-1048, SFN 0700967) carries SR 9 over McMahons Run.~|~10 - Bridge Replacement~|~409D3B98A6E582AE0A37A9B141E0F3B05025857A 88942~|~1~|~2~|~02/BRO~|~On going services by Consultant for the bridge during Construction~|~~|~017ACBF9F25483F524F5CF2FED731AF50138E655 96252~|~1~|~1~|~01/S<2/COL~|~Resurface 1.95 miles of CR 430 (Calcutta Smith Ferry Rd) from CR 435 (Parkway Ave.) at SLM 3.30 to the bottom of the 3 lane section (SLM 5.25). 80/20 Fed/Local.~|~05 - 4R Maintenance - Resurfacing~|~5C1EA1026C2C3B9E22443015E4540961625A86C5 96252~|~1~|~2~|~02/S<2~|~Resurface 1.95 miles of CR 430 (Calcutta Smith Ferry Rd) from CR 435 (Parkway Ave.) at SLM 3.30 to the bottom of the 3 lane section (SLM 5.25). 100% local portion above fed max.~|~17 - Construction Engineering~|~F5C183441FDE688A859B5E0DD912396A71DA12D5 114098~|~1~|~1~|~01/STR~|~Slope repair along STA SR 800 from 1.88 to 1.90 and 1.93 to 1.95.~|~~|~A2BDA2BDAEAEAAA12CB555EC5508222EF3A51EEF 105069~|~1~|~1~|~01/NHS~|~Resurfacing SR 5 from 14.39 to 18.25.~|~~|~3C9D7161961A31497E251E0768F2E909C973B136 105069~|~1~|~2~|~02/STR~|~Microsurfacing of TRU SR 5 from 30.95 to 32.51; TRU SR 5D from 0.00 to 0.07; TRU SR 88 from 7.03 to 13.95.~|~~|~BCC727FFACF88F15BCA2F429CC38F3C0E15F7408 105753~|~1~|~1~|~01/STR~|~Reconstruction of section to include widening and curb, gutter and enhancements in the Village of Covington.~|~04 - Reconstruction - No Added Capacity~|~864C33CD757EEB03D2CFA7C50A638F0EE3BA5653 105753~|~1~|~2~|~02/STR~|~Items funded 100% local traffic control items~|~21 - Safety~|~24F53D7AE7D74F360C8C6B9D37F8B36FA27CDB49 105753~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~1545ED0397D62F31124C9EEA5DBC5E1579622E45 109873~|~1~|~1~|~01/NFP~|~FY2025 District wide raised pavement markers.~|~21 - Safety~|~F04C3D3C9E6868DC4FA828E056D81FF0D31D9EA1 115148~|~1~|~1~|~01/S<2~|~GSM plan split to repair revetment along SR 163 shoreline~|~66 - Resilience Improvement - Highway Project ~|~AAB568CB1B683B6D9C10CE69CDF690958948CE7E 108266~|~1~|~1~|~01/MPO~|~Resurface and narrow existing roadway (road diet) to install wider sidewalks and bike facilities. Installation of decorative elements (street trees, street lighting, and planters.~|~28 - Facilities for Pedestrians & Bicycles~|~1265531F099AEE207075251B9D95ADC59EC9C8FF 108266~|~1~|~2~|~02/NFP/FAIR~|~Plan split for 100% locally funded work including utility (waterline) improvements, an alternate for including fibers in the pavement, and an alternate for decorative lighting. ~|~28 - Facilities for Pedestrians & Bicycles~|~8F80C7B36EFA9422F6C01095F7108FCE007AB416 109409~|~1~|~1~|~01/SAF~|~ District wide fast drying pavement markers.~|~21 - Safety~|~F6F6CD5F7DD2863776CB0218BA78491E9C57CA66 109714~|~1~|~1~|~01/S>2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~8B7B82DEE00EFDBC4F646C25B4F6FE3CCB7FE8E4 109714~|~1~|~2~|~02/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FA59167B8C65DF7D1D94BD776E0C90E711FB6FDC 109714~|~1~|~3~|~03/S>2~|~UPP - Tipp City resurfacing~|~05 - 4R Maintenance - Resurfacing~|~72AF0AE0167EAF5BFA793CBF30F0102E802997A3 109714~|~1~|~4~|~04/S>2~|~Paving west leg of SR571 in West Milton~|~05 - 4R Maintenance - Resurfacing~|~1A5A8CB9D5482F0B2144D75E0B2D213F1409979A 90207~|~1~|~1~|~01/ENH/MTVE~|~"01/ENH/OT/MTVE" - Local Enhancement Project - 4B37 (80% Federal) / 4BG7 (20% Local) - CAP $440,000.00 federal funding - City of Mount Vernone Bridge project installing a new pedestrian & bike path bridge in Foundation Lake Park utilizing an historical superstructure.~|~32 - Historic Preservation~|~CC7C29C371D78F46F698F60B46D4A9395B780BAD 108161~|~1~|~1~|~01/S>2~|~Milling and resurfacing including base repairs, loop detectors and thermoplastic striping.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7B9DAED53DADAF88253A7DAC04416A6B72F211C 106372~|~1~|~1~|~01/IMS~|~Bridge deck sealing/deck patching on IR bridges.~|~47 - Bridge Preventive Maintenance~|~FCF36EC91BB77E820215BE3F17A17769BBCB933E 124988~|~1~|~1~|~01/ENH~|~MPO CRP funds~|~28 - Facilities for Pedestrians & Bicycles~|~AB172FE412DAA4E1ED144013783F01E23F27E768 124412~|~1~|~1~|~01/SAF~|~All roundabout work included in this split.~|~04 - Reconstruction - No Added Capacity~|~78D9A1CD6F3E99984146CB1A1DC33A1D471659E5 121473~|~1~|~1~|~01/IMS~|~Embankment failure on HAM-75 near Hopple~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~347776F2409A8E61E1ED13B78E2EA23DC07494E3 97905~|~1~|~1~|~01/CMQ~|~CR 249 (OM 038) - This project provides a two way bike path. In addition a bike path will be constructed on top of the levy for the Great Miami River. This path will connect to the bike lane at one end and to a proposed ramp to Wolf Creek and Great Miami River trails being constructed by Five Rivers Metro Parks as part of the River Run project.~|~28 - Facilities for Pedestrians & Bicycles~|~CE1C749AA51F46F3AD0344A78AF42FE2EFA419DC 93099~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~3A034C63CAC486E28981492F8CF8E9CB5069DD18 93099~|~1~|~2~|~02/STR~|~Bridge Repairs WAY-301-02.84 sfn:8505020~|~13 - Bridge Rehabilitation~|~629A4AF2FF5AA58EA7FBFFD2E02FB9814F24C24B 123712~|~1~|~1~|~01/IMS~|~Plan split to paint bridges on the interstate system.~|~47 - Bridge Preventive Maintenance~|~6BA0976879A799CB864220EA5DF6EAA15696B845 94459~|~1~|~1~|~01/BRF/GCEO~|~"01/BRF/BR/GCEO" - CEAO Fed/State Exchange 4C87(80% State) / LNTP(20% Local) - CAP $579,680.00 @ 80% - Replacement of 3032914 BR Eligible for Replacement: Length=65 SD/FO(0) SR=53.9 DSR=6~|~10 - Bridge Replacement~|~2D4092D0749E1C9D222E7C5AA241E4C7FA994CFD 91393~|~1~|~1~|~01/NHS~|~Priority system resurfacing~|~05 - 4R Maintenance - Resurfacing~|~62E9D4C7F813534BA2271DE13C3C1EFFB8FCD519 99467~|~1~|~1~|~01/NHS~|~The project involves the removal and relocation of the existing railroad spur servicing Ametek Plastic, Inc. from its crossing of US-33 located just east of Cemetary Road to the north side of US-33 within the road right of way and on a similar alignment to US-33. Roadway items will also be part of this project including, repair of the existing US-33 pavement, installation of guardrail on the north side of US-33, pavement markings, drainage, utility relocation, etc.~|~44 - Other~|~662A7A593B87E8B650A66EBDE84CD390F9B031A0 108793~|~1~|~1~|~01/NHS~|~Urban paving split~|~05 - 4R Maintenance - Resurfacing~|~8277B9452B7B7105B1B96F817155BB2CBC26DC81 108793~|~1~|~2~|~02/NHS~|~100% City Items~|~05 - 4R Maintenance - Resurfacing~|~652684EBA5151ECDFC48971A32720136EF51FB60 117785~|~1~|~1~|~01/ENH~|~Shared Use Path utilizing Federal TAP funds at 95% (with TRC) and Federal HIP funds at 80% up to respective funding caps. ~|~28 - Facilities for Pedestrians & Bicycles~|~13A74EECEAD95EEC237D90EEE9D1D679527EDCC4 95234~|~1~|~1~|~01/SAF~|~100% SRTS funding up to funding cap for crosswalks, sharrows, flashing school zone signs, and bicycle racks~|~21 - Safety~|~D607F8C7FB5111AE991DC3E2BF37FDDCFA5D182E 108265~|~1~|~1~|~01/MPO~|~Mill and resurfacing of Dayton-Oxford/Chautauqua Road from Fairview Drive to Cedar Lane.~|~05 - 4R Maintenance - Resurfacing~|~5150F7689F40A443BE4033B083B745A22D7C08B8 89163~|~1~|~1~|~01/NFA~|~Safe Routes to School infrastructure project. Work includes construction of sidewalks and other pedestrian facility improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~CD678AE1CBE851126B6B8E7A23F2DF70539CD88F 84517~|~1~|~1~|~01/IMS~|~District wide bridge sealing project. Includes the following structures: HAM-42-1613, HAM-275-2238L, HAM-275-2238R, HAM-275-2338L, HAM-275-2338R, HAM-275-2438L, HAM-275-2438R, HAM-275-2454L, HAM-275-2454R, HAM-275-2541, HAM-275-2572, HAM-275-2594L, HAM-275-2594R, HAM-275-2612L, HAM-275-2612R, HAM-275-2620L, HAM-275-2620R, HAM-275-2645L, HAM-275-2645R, HAM-275-2722L, HAM-275-2722R, HAM-275-2733L, HAM-275-2733R, HAM-275-2749L, HAM-275-2749R, HAM-275-0618, BUT-75-0660W, BUT-75-0376, and HAM-75-1159L.~|~47 - Bridge Preventive Maintenance~|~061AC6627D7F52869EBF04A167D8FCBDE9D9F879 84517~|~1~|~2~|~02/STR~|~District wide bridge sealing project and includes the following structures: CLI-132-0084 and CLI-68-0882.~|~47 - Bridge Preventive Maintenance~|~6B73A52992ABECC62BEF8C636F1EE9927015644F 103833~|~1~|~1~|~01/MPO~|~Resurfacing of Center Road in the City of New Franklin~|~05 - 4R Maintenance - Resurfacing~|~EF431546011BBD2FE0EFCE1391573437006081EC 124362~|~1~|~1~|~01/SAF~|~Road diet & sidewalk on GAL 588 0.00-0.85. Work includes reducing the number of lanes from 4 to 3. Existing sidewalks to be widened and new sidewalks added. Safety funded 90 Federal/10 State.~|~21 - Safety~|~E43085DCFCAFAE4B5EC953AE227AD615900A4399 124362~|~1~|~2~|~02/STR~|~Resurfacing of GAL 588 0.00-0.85 using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~A6EEE3616F381FDA32A0DAB2C7990CC71374C6F3 95928~|~1~|~1~|~01/STR~|~Remove existing non-composite asphalt wearing surface and overlay with micro silica modified concrete. Place expansion joint gland system at approach, patch box beams and joints. Bridge # CHP-36-0804, SFN 1100718.~|~~|~04FBAEB71C4F10896E6C6009C8E9BD0669F27B39 113124~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment.~|~21 - Safety~|~3E0CFF2374E6A2357BD716B4615F927815A2FB2A 95576~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement ASD-302-02.48/ASD-071-13.68~|~13 - Bridge Rehabilitation~|~C5412AA89955F981676F827CA63F139F2959E030 115378~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4.~|~~|~5A97E3E74FF64AD465EBF32839F6778C5AA149B9 101744~|~1~|~1~|~01/BRF/LCEO~|~CEAO LBR program 4B87 (80% Federal) / LNTP (20% Local [15% CB and 5% LNTP] - See CAP Comments - Replacement of deficient bridge ((4533364) on McKean Twp Rd 118~|~10 - Bridge Replacement~|~FD4966F87F65A044DD8DE263F54884D49123FC93 90580~|~1~|~1~|~01/CMQ~|~4 traffic signals on SR619 in the Village of Hartville, Stark County, Ohio.~|~21 - Safety~|~AE7FFC765C337616ACC4BFECB5408E9758645E3C 123252~|~1~|~1~|~01/S5K~|~Lighting Replacement~|~21 - Safety~|~92A7FEF5D7E48FD695FDF91EC87B0D6928E11215 97165~|~1~|~1~|~01/S>2~|~Bridge replacement on CR 11 Home Avenue over Little Cuyahoga River by the Summit County Engineer.~|~10 - Bridge Replacement~|~ACF2FED15D84C7D86ED52737D37B2C2809211FDB 97165~|~1~|~2~|~02/S>2~|~100% City of Akron items.~|~43 - Utilities~|~95AB8C5FF67E2FC56C080AAA930E32769E5B8360 97165~|~1~|~3~|~03/S>2~|~100% AT&T Fiber Relocation.~|~43 - Utilities~|~CFB85D81DE1A237D4D4314B80752D1AC70959B2A 120948~|~1~|~1~|~01/S5K~|~Small City Funding~|~04 - Reconstruction - No Added Capacity~|~92E2A2BD880BCD8F244F12CA8F56A3454846BDB3 120948~|~1~|~2~|~02/S5K~|~District Pavement Preservation Funding~|~04 - Reconstruction - No Added Capacity~|~5DF6C461BA5D8EBC555FD319AF9CB805D728373C 125820~|~1~|~1~|~01/S>2~|~Plan split for reconstruction of Columbia Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE5D189F8DB363874B7EA1857F00765F7886D1EB 85087~|~1~|~1~|~01/STR~|~01/STR/PV/ Resurfacing using rural STP funds. Work outside the Kenton Urban Area. All work on US 68 and SR 81. Funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~51D2EF94B19F269AA90618FBF4A1B79EA3D37D9A 85087~|~1~|~4~|~04/S<2/KENT~|~04/S<2/OT/KENT/ Items paid 100% by the City of Kenton. For pavement repair costs and specialized pavement markings requested by the City of Kenton for routes within the city limits.~|~05 - 4R Maintenance - Resurfacing~|~A70301427F28FB8A75D9B87DBFCA73000FB05610 85087~|~1~|~3~|~03/S<2~|~03/S<2/PV/ Work outside the City of Kenton but inside the Kenton Urban Area. All funds from the District Preservation Program budget. No local funds. SR 31 on the right side from SR 292 at 10.16 to 10.37. SR 67 from 17.31 on the right. SR 309 on the left from Washington Blvd to 16.72 and 16.75 to 16.85. SR 309 on the right from 16.75 to the end of the project at CR 171 at 16.93.~|~05 - 4R Maintenance - Resurfacing~|~B1085C0DCEFD85F68F2C9722C4BEF7EA1C3D87DB 85087~|~1~|~2~|~02/S<2~|~02/S<2/PV/ Work inside the City of Kenton. Federal funds from the District Preservation Program budget. The 20% match is provided by the City of Kenton. All of SR 31 on the left side. SR 31 on the right side starting at 10.37. SR 67 from the corporation limits at 15.07 to 17.31 on the right side and 17.53 on the left side. SR 309 on the left side from 16.72 to 16.75 and 16.85 to CR 171 at 16.93. SR 309 on the right side from 16.71 to 16.75.~|~05 - 4R Maintenance - Resurfacing~|~B5111EDF19D20302A8BAF2C5992DCE598281EE59 96079~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " Plan Split for the construction of a loader/equipment storage building to be constructed at the site of the old Gue-70-03.47 EB weigh station~|~~|~7860052ADA4D474230FD04297B8661072AE68A5B 104408~|~1~|~1~|~01/SAF~|~All work associated with separating the I-75 southbound ramps to I-275~|~21 - Safety~|~5807197FCC4EE9D8DB896D1CCF91583DC20B9AD0 104408~|~1~|~2~|~02/SAF~|~Plan split for ODOT Labr for scope development~|~44 - Other~|~83577D3042043DAC1334199217C4269F31A68758 119012~|~1~|~1~|~01/BRF~|~Superstructure replacement on bridge.~|~13 - Bridge Rehabilitation~|~4F52C8B8EB0E646EAD2C43E84D3EA3137B5B5362 117083~|~1~|~1~|~01/NFA~|~Access road in Ripley, Ohio.~|~01 - New Construction~|~C9E29CD7390B3EE51F0AA197DDCA5E6ECDE8A069 100488~|~1~|~1~|~01/NHS~|~ROS 35 (15.22-20.48 & 22.75-25.02)~|~05 - 4R Maintenance - Resurfacing~|~5E21AB1F063DA4502C331CB7E2C7F79E1E7AAA49 100488~|~1~|~2~|~02/NHS~|~Bridge work 7101686 ROS 35 15.517101651 ROS 35 15.517102011 ROS 35 19.217102194 ROS 35 20.417102259 ROS 35 24.207102291 ROS 35 24.21~|~47 - Bridge Preventive Maintenance~|~E41144AD3738B240653B754A36FAA73BE9182319 95120~|~1~|~1~|~01/CMQ~|~Relocation of the existing Western Row Road and Columbia Road intersection 820 feet to the east.~|~04 - Reconstruction - No Added Capacity~|~70D1753829E2257194653402D99FF25596DBC71D 95120~|~1~|~2~|~02/S>2~|~Plan split to cover Greater Cincinnati Waterworks relocation that is not eligible for project reimbursement.~|~43 - Utilities~|~96A6A1B795C2FB6E2A3BE1B2B427D3F555296621 104263~|~1~|~1~|~01/STR~|~Bridge repair Uni-31-9.95 over Bokes Creek. SFN 8000506~|~13 - Bridge Rehabilitation~|~10983F61AA1E173CAC24A41FF975CDD54790D10E 119110~|~1~|~1~|~01/NFA~|~D3 PR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E9FF8D192737BB2BBAB1C20831A4C1BE05CA8D83 93265~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 2303515 FAI SR664 4.66 Intersect: Little Rush Creek; BR Eligible for Rehabilitation: Length=145 SD/FO(1) SR=68.5 DSR=5~|~13 - Bridge Rehabilitation~|~F9517BEB8F4420E38987B615BABD6B5D05121B2C 90383~|~1~|~1~|~01/CMQ~|~Normal Project participation using 100% MORPC CMAQ/4TB7 funding for signals~|~21 - Safety~|~E2D5BEF66F872B9945842205B8562ACDADA983FD 87822~|~1~|~1~|~01/STR~|~General System Minor Rehab. on BEL-250-0.00 to 6.65; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~6BAFE5726ADA8752D67BE9E5C8969DE5C9BA65B7 87822~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on BEL-40-27.54 to 28.50 and BEL-250-6.65 to 9.64; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~A8F0A64E9DC5E2CD229EDFCF14E71E3F91207562 112176~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span.~|~~|~4D94A240577353ED1FD21CC3170357C4F38BF8ED 114996~|~1~|~1~|~01/NFP~|~All work in this plan split funded by district allocations using 100% state funds, SAC 4PS7.~|~21 - Safety~|~8F47506814696C120D2D24BDD992EA8FA4EFDE9D 88974~|~1~|~1~|~01/IMS~|~District Allocation~|~13 - Bridge Rehabilitation~|~1BD6990FFF1E4678117140CAA5ECAF4CBC946317 91739~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a chip seal treatment. WAS 26 1.79-2.19. Urban federal aid funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~EDCF653F41C512F6349C4BF7BC75F9AAC4915781 91739~|~1~|~3~|~03/STR~|~Two-lane resurfacing project using a chip seal treatment. NOB 564 0.00-0.03, MOE 26 5.59-14.60, MOE 145 0.00-8.30, NOB 565 0.00-2.88, WAS 26 2.19-11.79. Rural other federal aid funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~E9179F495BA76B1DF8958AA0C27A7B8808C508CF 91739~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using a chip seal treatment. MOE 26 21.65-29.45, MRG 669 5.62-11.92 and NOB 564 0.05-13.50. Not on any federal aid system funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~5617D228B5085F8D87C458E2490FB2547B4D94B5 119368~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~420915A94F808DFAA8FBA24F63D1553756B2F7C3 104698~|~1~|~1~|~01/NFA~|~Cold storage building Miami County FS facility.~|~44 - Other~|~C8052177D09C73B87A78032729E0DC5BF594D2BC 110398~|~1~|~1~|~01/MPO~|~Reconstruct roadway from Providence Avenue to Villa Road.~|~04 - Reconstruction - No Added Capacity~|~1A9831065BE30261EC8FEFE182CC6FF0CD0E7C45 116957~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9341E3F511BA88725C8BB3A74C0ACB8041FAF00A 90900~|~1~|~1~|~01/IMS~|~Plan split for all paving work.~|~05 - 4R Maintenance - Resurfacing~|~1E25B5AAEFAD35F1A6627508D1C056DF77DE332A 104264~|~1~|~1~|~01/SAF~|~Installing raised pavement markers on various county routes throughout Trumbull County.~|~21 - Safety~|~61911BD7E27AC4B87243075207A10B3E278E018C 86687~|~1~|~1~|~01/NFA~|~Safe Routes to school project adding sidewalks, light pathways, upgrade and add new crosswalks and a bike rack at the Fairview School in Dayton.~|~21 - Safety~|~5A5D7D8755762485B756E019A17FAB22BC5699C8 122591~|~1~|~1~|~01/ERD~|~Stabilize Faraday Road by piping and filling a ravine that parallels the roadway and has seen excessive ongoing erosion. Roughly from Cass Avenue for 800 feet to the southeast.~|~66 - Resilience Improvement - Highway Project ~|~E58C30DAB9F1075C186AAE2384078D6D525DD0F8 102957~|~1~|~1~|~01/S<2~|~STP < 200000 ? ASD-42-2.92 to 3.63 & RIC-42-13.13 to 17.52~|~05 - 4R Maintenance - Resurfacing~|~31882A5E328AAE18042B10D2446AC9068CE0E174 102957~|~1~|~3~|~03/S<2~|~STP < 200000 (City of Ashland ? 80/20 Fed/City) ? ASD-42-3.63 to 3.80~|~05 - 4R Maintenance - Resurfacing~|~CA685595674FBFDF2B38FBE7B8B7DE934AE8D8B9 102957~|~1~|~7~|~07/SAF~|~Install Centerline Rumble Stripes using Approved Safety Funds: RIC-42-16.39 (Fleming Falls Rd) to 18.05 (RIC/ASD Co.) ASD-42-0.00 (RIC/ASD Co.) to 1.00 (SR603) ASD-42-1.34 (TR1353) to 2.77 (TR1536)~|~21 - Safety~|~B79CAC3C959650F88A88F5CA113D33ED0BF6C12C 102957~|~1~|~2~|~02/STR~|~STP Rural ? ASD-42-0.00 to 2.92 & RIC-42-17.52 to 18.05.~|~05 - 4R Maintenance - Resurfacing~|~4BFB9E3EE39476AA578D0EAC13385926825E2740 102957~|~1~|~4~|~04/S<2~|~STP < 200000 (City of Ashland ? 100% City) ? ASD-42-3.63 to 3.80~|~05 - 4R Maintenance - Resurfacing~|~0F04E850730CD1D01B6661030D18D8E25E3878AF 102957~|~1~|~5~|~05/STR~|~STP Rural Bridge Work ? SFN 7003072~|~13 - Bridge Rehabilitation~|~65C5A1BE2EE886246B1D59F9E67D60A9A14ECFE3 102957~|~1~|~6~|~06/S<2~|~Bridge work - STP < 200000 ? SFN 0301086~|~13 - Bridge Rehabilitation~|~9E401CE1FDC78703AE4DD0C5BAD61E19AB522202 109250~|~1~|~1~|~01/NFP~|~Guardrail replacements and upgrades on various routes throughout District 4.~|~44 - Other~|~47B5AD31F1802E5B3F7A8729440D62DB1C9DC7BB 109250~|~1~|~2~|~02/NFP~|~Replacement of Type A terminal ends.~|~44 - Other~|~44A1CBA100D7C634F03CB5FA1DC965911DE37661 90867~|~1~|~1~|~01/S>2/PICK~|~"01/S>2/OT/PICK" - City of Pickerington SRTS project. 4SC7 (100% Federal) CAP $191,741 ($300,000.00 minus $108,259.00 {RW & PE}) All purpose path from Fai-TR 222-00.31 to 00.64 City of Pickerington responsible for costs above the CAP.~|~21 - Safety~|~A8DAACB237F355616FA8AB6532E077321F4C2F69 120464~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads at Lake Logan State Park.~|~05 - 4R Maintenance - Resurfacing~|~41F06994ED1E27CA693F5CF9009B52F558E815F5 80551~|~1~|~1~|~01/BRO~|~4800303 LUC SR2 18.62 Intersect: Maumee River,Rrs&Streets~|~13 - Bridge Rehabilitation~|~FC78D767995A804719F1AABD94FAC973732E9743 116919~|~1~|~1~|~01/BRO~|~Bridge Deck Repair~|~04 - Reconstruction - No Added Capacity~|~BFC3D2387DDD6B0FE59AD0875E5C2459A1CBF864 4067~|~1~|~1~|~01/MPO~|~Major widening~|~~|~921356B854E9EA3D5601DCC0932D8027014B72CB 93944~|~1~|~1~|~01/NFP~|~100% State Funds (4PS7) for district wide auxiliary pavement marking.~|~21 - Safety~|~BE67B7D2E484F9528EA05594669425D442682598 115715~|~1~|~1~|~01/NHS~|~plan split NHS location CLI-73-1.795~|~04 - Reconstruction - No Added Capacity~|~9AB5C934A651C25F486CAC7462B96883F164F944 115715~|~1~|~2~|~02/STR~|~plan split for rural location CLI-73-20.74 and CLI-350-15.78~|~04 - Reconstruction - No Added Capacity~|~5A6F85E9272B4C4A04707C60EF1699F590325FE9 82380~|~1~|~3~|~03/BRO~|~BR funds used for bridge 1806912.~|~~|~02E34B8ED26CC89E907B47F9FC59527F510455CA 82380~|~1~|~2~|~02/IMS~|~80/20 fed/state funding split for all work using major programs funding for all structures: 1807838, 1807862, 1807897, 1806785, 1806815, 1806874, 1806904, 1806939~|~~|~2CF25EC7DAE046881CC8EE35E33CD30040FC27AC 82380~|~1~|~1~|~01/IMS~|~80/20 fund split for all pavement work using TRAC or other major program funding.~|~~|~6EB352B10626A377C1E01B364F6341C2E622259F 118119~|~1~|~1~|~01/NHS~|~added plan split.~|~21 - Safety~|~8E50E5236CA5F8667C55A53EF7A445F03996A8A7 105206~|~1~|~1~|~01/STR~|~This plan split is for rural routes.~|~05 - 4R Maintenance - Resurfacing~|~03B8978292081762D31BDA946E0B8AC874EBD4A0 105206~|~1~|~2~|~02/S>2~|~This plan split is for the large urban sections~|~05 - 4R Maintenance - Resurfacing~|~8E16B19CD0295B51086E0F266DDA3DA5B42FEDD4 105206~|~1~|~3~|~03/S5K~|~This plan split is for the small urban section~|~05 - 4R Maintenance - Resurfacing~|~C9CAE0C3E43843E0754BD6523FF63E65086F3729 105206~|~1~|~4~|~04/STR~|~Plan Split for bridge work included in the project.~|~13 - Bridge Rehabilitation~|~2E39BCB5011FF084AC4E4769A71AD43D16BA0157 123675~|~1~|~1~|~01/NHS~|~culvert plan split.~|~04 - Reconstruction - No Added Capacity~|~0AD178204A27D248943031092789BF690B18375B 125516~|~1~|~1~|~01/SAE~|~Install new and upgrade existing pavement markings on various county roads.~|~21 - Safety~|~037D097381C15B96B5ED9143B936C8A7BB656D40 89145~|~1~|~1~|~01/NFP/HAN~|~Work to replace the bridge. 95% state funds SAC 4C87. The County Engineers Association of Ohio (CEAO) and ODOT approved the project to be part fo the Federa/State Exchange Program. The 5% match is provided by the Hancock County Engineer.~|~10 - Bridge Replacement~|~7A991F47D99B8F44A61549BD0E6D654D24F1E158 99486~|~1~|~1~|~01/IMS~|~Slide repair along Northbound IR-77 (SLM 0.26 to SLM 0.55) in the City of Green, Summit County, Ohio.~|~~|~5B71F413BB6ABF754AB027B7AFD85962FDA62CF0 110685~|~1~|~1~|~01/S<2~|~Slide repair PIK 551 1.35~|~04 - Reconstruction - No Added Capacity~|~5AAF9470D30289E6A5D258EDFD33193C4392AA29 117463~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~4EB4C50FC724DBCC4C6F6EA9B9D9FFF1B8C625E4 84747~|~1~|~1~|~01/NHS~|~Add an additional left turn lane from SR 4 to NB Liberty Fairfield Road, installing additional through lanes on Liberty Fairfield Road, improve pedestrian mobility in and around the project area. Sponsor Butler County~|~03 - Reconstruction - Added Capacity~|~A507D9D6414DE9B7065605427FA922D80D3D66FD 97493~|~1~|~1~|~01/BRO~|~Repair or line existing CMP structure.~|~17 - Construction Engineering~|~0248EDED8C50982F8F489E57ED2E6F822ACA30F8 123363~|~1~|~1~|~01/SAF~|~Extend the northbound turn lane to 600 ft at Hamilton Rd (SR 317) and Williams Rd.~|~21 - Safety~|~2EE249CBBF97094FE3BFA80108D5375319834E2A 95771~|~1~|~2~|~02/S5K~|~SEN-18 from SLM 15.379 to 15.923~|~05 - 4R Maintenance - Resurfacing~|~DA7163892A3161F9427C632168EE8A210CF130AB 95771~|~1~|~1~|~01/STR~|~SEN-18 from SLM 15.923 to 17.93 & SEN-4 from SLM 7.52 to 13.23~|~05 - 4R Maintenance - Resurfacing~|~86E12FA7BA1AC61D9617990DC60D8D59A0CEFABD 85396~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for STP funds~|~05 - 4R Maintenance - Resurfacing~|~67CE22E7543CD8D93F5D23D6A7FA562FF18F6469 85396~|~1~|~2~|~02/NFP~|~Work items not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~2114783699B1994D2AF8AF51487B448C573AD3EF 23449~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~13 - Bridge Rehabilitation~|~AA6C76E0D6E51D7859F9C78AEEFFF4A25DD69F63 23449~|~1~|~2~|~02/S>2~|~Plan split for the rehabilitation of culvert downstream of ROW at 100% city cost.~|~13 - Bridge Rehabilitation~|~5754B0FE9F175785E684B2DC9FDCCD2FF46A773D 90285~|~1~|~2~|~02/NHS~|~SFN 5702917 MOT 35 1876 structure will either be replaced or repaired. Will adjust description once we know if we will have TRAC funding.~|~~|~2D1420D60BEF79400351E6C8549AD965A5710F07 90285~|~1~|~1~|~01/NHS~|~Modification of the interchange of US 35 and Smithville Road on US 35 (SLM 18.82 to 19.56): Smithville Road-Barstow Avenue to Linden Avenue.~|~~|~B0F99537E8366346C97CF668137A49D24BDCDA93 103268~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~A570E26E107D0CD2E6719DCEF9E9F5D4CED61E68 76404~|~1~|~1~|~01/IMS~|~See Linked Structures.~|~13 - Bridge Rehabilitation~|~8CDA987FFE7A78485DED48421EBB05BC8C523C39 90444~|~1~|~1~|~01/NFA~|~Concrete bridge deck overlay project on VIN 356 0330 (SFN 8203121). Funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~7300C7F2676421545455CD72400147FCAFE1B385 25594~|~1~|~4~|~04/IMS~|~Major rehab funding for five noise walls:Spicewood (NW corner of 70/Alton Darby)Wexford Green (S of 70 between Alton Darby and Hilliard Rome)Trabue Woods (NW corner of 70/270)Hilliard Run (N of 70 between existing wooden noise wall and Hilliard Rome entrance rampAdditional wall N of 70 by Hilliard Rome~|~01 - New Construction~|~1136D63447F2C8CF26E2392A712291FE6E17B347 25594~|~1~|~3~|~03/IMS~|~Use $400,000 of D6 funds first, then go to 7PM7Conc deck overlays or deck replacements on 8 structures:2503905 FRA IR70 4.17 Intersect: Clover Groff Ditch2503964 FRA IR70 4.17 Intersect: Clover Groff Ditch2504057 FRA IR70 6.3 Intersect: Over Ns Rr2504081 FRA IR70 6.3 Intersect: Over Ns Rr2504111 FRA IR70 6.78 Intersect: Over Ramps To 70E & 270S2504146 FRA IR70 6.78 Intersect: Over Ramps To 70E & 270S2504200 FRA IR270 6.9 Intersect: Over Ir 2702504235 FRA IR270 6.9 Intersect: Over Ir 27002/IMS/BR/~|~13 - Bridge Rehabilitation~|~7C6D9BE2AF5A4ABF732DB62CC71D183A3C143C60 25594~|~5~|~5~|~05/IMS~|~HSP funding for Ramp D improvements. Funds transferred from FRA-CR3-12.96, PID Number 98557.~|~21 - Safety~|~C142D6A6E33112A871FACD9CF6A54F5787E07774 25594~|~1~|~1~|~01/IMS~|~D6 funding for resurfacing and guardrail, drainage, and signs from SLM 3.41-5.27~|~05 - 4R Maintenance - Resurfacing~|~7D0D049A094E2A9A3B440347D6CA6033392C6526 25594~|~1~|~2~|~02/IMS~|~Major rehab funding pvmt split from SLM 5.27-7.60Use $84,310 of 4SW7 first, then go to 7PM7~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A5AF481A92A461166E053FAFADB2EDC19A14FEBE 25594~|~1~|~6~|~06/IMS~|~Contractor reimbursement for repairs due to vehicle accidents~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3119A4267E0032FDAE36AC4E7E08E40564D7D225 126246~|~1~|~1~|~01/STR~|~Culvert Replacement ATH-78-4.62~|~04 - Reconstruction - No Added Capacity~|~E98B3921010D78914F7154091BEFB605FE241D65 93898~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) district wide. 100% state~|~21 - Safety~|~9B87FD69641DA846BDD5793F1C42B8CD7D219FD3 103420~|~1~|~2~|~02/NHS~|~2" Mill and Fill on NHS route in the City of Englewood - UPP.MOT-49 SLM 7.87 to 8.16~|~05 - 4R Maintenance - Resurfacing~|~E1FE7F62B87A4C8A7C09FDE7E2705316AF8F6160 103420~|~1~|~1~|~01/NHS~|~2" Mill and Fill on NHS route in the City of Clayton - UPP.MOT-49 SLM 6.40 to 7.87MOT-49 SLM 8.16 to 8.82~|~05 - 4R Maintenance - Resurfacing~|~50468BB149F873334CF737C32F13EE21EEE4648D 101250~|~1~|~1~|~01/STR~|~Plan Split 01 includes SR and non-NHS US routes.~|~05 - 4R Maintenance - Resurfacing~|~5270E613A4993FB4176B75832701A6C7C52A580E 107668~|~1~|~1~|~01/NHS~|~ Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~0BD096C791C864DC60B17D1D7704EC208D9C3F39 95001~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~44 - Other~|~F20EB6756CAFF47451E5E19F55D04854655FEDD9 117709~|~1~|~1~|~01/BRO~|~ All the work of the project. 80% federal funds and 20% state funds from the District budget.~|~13 - Bridge Rehabilitation~|~C968902FDC9431FA03E1D1A810B823EB7DD2F10B 98896~|~1~|~1~|~01/S<2~|~Demo a Res. at 400 N. Mill Street, Orrville, Ohio~|~44 - Other~|~969B42835D0E1E7F103389B5BC93D82CD96D5DFB 101179~|~1~|~1~|~01/STR~|~AC overlay on US 42 and SR 314~|~05 - 4R Maintenance - Resurfacing~|~F7BC95B8C4BA709541709DEA138A2BF497C81AC2 110265~|~1~|~1~|~01/SAF~|~Project entails mitigating twelve active landslides occurring within upslopes along 2.2 miles of US50.~|~21 - Safety~|~5DD50695513420EC32B915AB5023068842A77C00 123385~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~8FF6EDB3067848279A1B17F8AC103D4FE01ED982 111005~|~1~|~1~|~01/NHS~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~AF512C95E7FC5F87CC4F23E05877C29C1AC2022B 104986~|~1~|~1~|~01/NFP~|~Systematic sign and support replacement along STA I-77 from TUS County Line to US-30 and US 30 from Belden Ave to Trump Ave.~|~21 - Safety~|~F388BF744DB031993EF55F449D2BA054D1B13E1C 120233~|~1~|~1~|~01/S5K/MTVE~|~Reconstruction of Edgewood Road in city of Mount Vernon~|~17 - Construction Engineering~|~78C32C6DDA7A50CF883A3E67D894EADDE63F4705 117211~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~BC9243DE13648AFDD5AD8154DABB3DF481A1AD3C 89314~|~1~|~1~|~01/S<2~|~Improve Mall Rd including widening, signals, turn lanes, etc., from Banfield Rd to US 40. Project to include widening on US 40 from Mall Rd to Eric Dr. Also construction of new connector roadway from US 40 south to intersection of Mall Rd/Banfield Rd.~|~01 - New Construction~|~D9AB3A4AF115B3281FD946A5DA4D083EBA3CBD8A 100168~|~1~|~1~|~01/NFP~|~100% STATE FUNDING FOR DRIANAGE CLEANOUT WORK.~|~99 - State Preventative Maintenance~|~84F45ED081B3F413CAFCCBCA2A1B0816E4EAE724 97737~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~~|~06D4F931215FCFB904DE1B829131FABB0374E42E 113757~|~1~|~1~|~01/NHS~|~Deck replacement > 20' span.~|~13 - Bridge Rehabilitation~|~5E80648DD1C458539014C63FB72449BBFBC1F5DE 98016~|~1~|~1~|~01/NFP~|~Construction Inspection Agreement~|~17 - Construction Engineering~|~B9BB808BCD8C59FC775B132B265FEC72A02928E7 124236~|~1~|~1~|~01/IMS~|~Plan split for bridge replacement work~|~10 - Bridge Replacement~|~43C44252B63C45B2E07C5A886606D1898EDC38B7 23455~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds. 4306155~|~13 - Bridge Rehabilitation~|~8C4515752201FAA8D3DC666B4086A9BD054ECF3F 92507~|~1~|~2~|~02/STR~|~Repair embankments at various places along SR-43502/STR/OT/~|~~|~4804F5BFA3A35446E9152A2B063E51112762FBF9 92507~|~1~|~1~|~01/NHS~|~Repair embankments along various places on US-3501/NHS/OT/~|~~|~C0D56DF7FF5EE7AF414A12734760A70753EF06FF 115227~|~1~|~1~|~01/SAF/TUS~|~Guardrail upgrade/replacement on various county routes with 100% (4HB7) CEAO Safety funding.~|~21 - Safety~|~0D13E1B2EB737CEC496EE12AE9E4C5AC8876B1F5 101284~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D75A53664F8C7713ED812F73612ACCA30A384D0C 101284~|~1~|~2~|~02/STR~|~100% Locally funded plan split to replace curbs on N Liberty St. (US-127) from Jackson St. (US-20A) to Legion Dr.~|~05 - 4R Maintenance - Resurfacing~|~C2BD2A0BB9E5A1BC178B41E48DC8493CCA98AABD 113722~|~1~|~1~|~01/SAF~|~Realign Mason Morrow Millgrove Road west of Columbia Road North. Add a westbound right turn lane, sign and pavement marking improvements, etc.~|~21 - Safety~|~3D5F49174E6B6D9EACDFBF979405BFEFC75D173E 113722~|~1~|~2~|~02/SAF/LEB~|~Plan split for 100% locally funded full depth reclamation outside the limits of the ODOT safety improvement.~|~~|~02646139E1B2117903AEFC988872022F71172BE7 108734~|~1~|~2~|~02/NHS~|~Smoothseal PIK-32-15.77 to 20.14Suspend/Resume 16.63-16.94 for R-Cut (J-Turn).~|~05 - 4R Maintenance - Resurfacing~|~F43EA7540FB063CFC016D460D473E8CA45AFAB51 108734~|~2~|~1~|~01/NHS~|~PIK 32 16.63-16.94 Safety project constructing an R-Cut (J-Turn) at the intersection of PIK 32 and Shyville Rd.~|~21 - Safety~|~E18ED61463477D119E74663B34004DCF52D7BA35 87186~|~1~|~1~|~01/STR~|~4003055 JAC SR279 4.06 Intersect: Holland Fork80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~0EE8D69E24BD2E1C43B415C1E1E6427E486CCFD3 97237~|~1~|~1~|~01/NHS~|~Traffic study for various alternatives for reducing congestion and improving safety in and around ATH US 33 E State Street interchange. ATH 33 14.99~|~~|~36D3FF7912359165364443FFA92C25FE63E9FADB 97237~|~1~|~2~|~02/S<2~|~Traffic study for various alternatives for reducing congestion and improving safety in and around ATH US 33 E State Street interchange. ATH 33 14.99~|~~|~9892A12BD4B67DA51B1A1804E7D28B59FC7153EC 114240~|~1~|~1~|~01/IMS~|~Maintenance of Traffic contract for BSB.~|~21 - Safety~|~40708A0F319AD13A5C2137CC3B50782CB444113A 109259~|~1~|~1~|~01/S<2~|~This project will consist of widening SR 703 to include a new 305? (which includes a 50-foot taper) eastbound left-turn lane and a new 285? (which includes a 50?-foot taper) westbound right-turn lane into the proposed Tri-Star 2.0 site. This project also includes the installation of a traffic signal with advanced detection and a pedestrian crossing to the Wight State Campus.~|~21 - Safety~|~5C017A1F3D6F3956970E70750BFE85F6B1AE633C 121187~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~96288252CAF936B4B266D8918395F43AD1037E5A 122397~|~1~|~1~|~01/NFA~|~Plan split for crack sealing at Middle Bass Island State Park~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E61BBAE73F7997325E384ED9D37C93B6DC61A4C3 116493~|~1~|~1~|~01/STR~|~Replace or Repair Culverts~|~~|~F78BDCEADB6BF5F8CB68DB425F7B6A38D95E29D8 90430~|~1~|~1~|~01/STR~|~Bridge replacement project. MOE 145 1163 (SFN 5602130). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~413B04037656408C650A384AE57E2F6CFED2CB0E 87126~|~1~|~1~|~01/IMS~|~Preventative Maintenance on the Priority System in Clermont County for FY2019. Routes include I-275~|~99 - State Preventative Maintenance~|~EE43828D7FE43E1848A5A87DFBDD633315BB5A2F 115341~|~1~|~1~|~01/MPO/STRE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A4C0279C518747C9669C7A135CDD1AA4C601A583 93918~|~1~|~3~|~03/NFP~|~All work outside curbs and deeper than 3.5" between SLM 13.28 and 14.99. (curb curb ramps, sidewalks, full depth repairs,....)~|~05 - 4R Maintenance - Resurfacing~|~D09F275D9B2AF9E3E868344DD51C635FAE367279 93918~|~1~|~1~|~01/NHS~|~Urban Paving from SLM 13.28 to SLM 14.56 (NHS) all pavement work from curb to curb up to a depth of 3.5". (Secor to Monore)~|~05 - 4R Maintenance - Resurfacing~|~6890362D97D08C5FBF696902A869119E37F67C55 93918~|~1~|~2~|~02/S>2~|~Urban paving from SLM 14.56 to SLM 14.99 non-NHS. Monroe to Upton.~|~05 - 4R Maintenance - Resurfacing~|~F31C4A36AA852BBF230D0A1F1983DF07FDCF6A29 116896~|~1~|~1~|~01/MPO/ALLI~|~Resurfacing.~|~~|~1B20060EE3251AE1A3222776B99F2165C3CF6655 117342~|~1~|~1~|~01/BRF~|~Primary Plan Split for Local Bridge Program eligible scope items~|~13 - Bridge Rehabilitation~|~FACF7C00A76C9CECF295A415DDC1D7AFE90F0A8D 123802~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~88D451021FC9B9BFD96FF9B1E94855ECFC26B5EB 88853~|~1~|~2~|~02/NFA~|~This split is for the portion of SR 293 being resurfaced in this project that is north of CR 330. This portion of SR 293 is classified as a Rural Minor Collector and cannot use federal funds for resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1D3D6077B8F56967B44956DB5BE077541A7B09EE 88853~|~1~|~1~|~01/STR~|~This split is for the portion of SR 293 being resurfaced in this project that is south of CR 330, and overlapping CR 330. This portion of SR 293 is classified as a Rural Major Collector and can use federal funds for resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A723CFBA19DF9B5B9F6BAA42DD4049A121F266AF 110073~|~1~|~1~|~01/IMS~|~FAY 71 from 9.46 to 14.66 and MAD 71 from 0.00 to 4.56. AC Overlay with repairs and upgrade guardrail as needed.~|~05 - 4R Maintenance - Resurfacing~|~7130F5D3A685E83327158BF294983089C9A28857 110073~|~1~|~2~|~02/IMS~|~FAY 71 and MAD 71 bridge work. Sweeping & cleaning of bridges, sealing decks~|~47 - Bridge Preventive Maintenance~|~1EF6F6C200B6353889B70A6E64F45DF7F24BBA21 94661~|~1~|~1~|~01/NFA~|~rehabilitation of Washington and Reid Avenues.~|~44 - Other~|~2E66300FF773BC294F1E3E80779BFE4E03E080D0 76785~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~~|~CA16099B29A3213416BF3B3D94402CD562D00DBB 114501~|~1~|~1~|~01/BRF/LISB~|~Construction of bridge with 95% Municipal Bridge funds (4R87 includes 15% Toll Revenue Credit) and 5% Local funds (4BG7).~|~10 - Bridge Replacement~|~46603F206AE83E44EBA5972C7CF91907CFE4F86D 105563~|~1~|~1~|~01/STR~|~Rural plan split: MAD-40-3.03-13.92 MAD-40-14.96-15.59 MAR-257-0.35-0.65 MRW-19-8.78-10.40 MRW-61-0.00-1.15 MRW-61-1.71-3.27 MRW-61-14.83-22.86 PIC-752-2.32-8.43 UNI-4-14.88-24.28 UNI-42-0.00-4.84~|~05 - 4R Maintenance - Resurfacing~|~612CC0865AFC29E3442C6B872DE8C35D90158A74 105563~|~1~|~2~|~02/S<2~|~Marion urban area plan split: MAR-423-6.19-7.46~|~05 - 4R Maintenance - Resurfacing~|~A4402D41FF399F287170A714047A9FA17D256BE2 105563~|~1~|~3~|~03/S<2~|~Ashville - S. Bloomfield urban area plan split: PIC-752-0.00-2.32~|~05 - 4R Maintenance - Resurfacing~|~310F17BCC1AD75960F5FB987372CD13995D0C1A5 105563~|~1~|~4~|~04/NHS~|~NHS plan split: PIC-23-0.00-1.49~|~05 - 4R Maintenance - Resurfacing~|~37F8E53625D574A27C0030EA39FE94EA407C7348 105563~|~1~|~5~|~05/S<2~|~Marysville urban area plan split: UNI-4-14.06-14.88~|~05 - 4R Maintenance - Resurfacing~|~8A30C9B6BDCB5C73440B2528C0146A2B8221E570 122044~|~1~|~1~|~01/STR~|~Construct roundabout at the intersection of DEL SR 61 and SR 521~|~21 - Safety~|~9F4F88B48FD200BC46DCA5258C1AF8C8838DF531 119926~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT/ - Plan Split 1~|~21 - Safety~|~DDE9C25945BD06EED873F11BEFDEAC3F1E86F31E 83449~|~1~|~1~|~01/IMS~|~District Allocation - Bridge Replacements LOR-090-13.20 L&R and LOR-090-13.55 L&R~|~10 - Bridge Replacement~|~FB9E286CD48F916FEBD3EA99D1F163CEAC3B003C 83449~|~1~|~2~|~02/IMS~|~Consultant ongoing services for design~|~17 - Construction Engineering~|~96DD956D6A58B3960A7B5C7AA59D0B6C80152E79 89161~|~1~|~1~|~01/NFA~|~"01/BRF/BR/MUEN" - CEAO Funding 4B87(80% Federal) / 4BG7(20% Local) - CEAO CAP = $424,800.00 federal requiring local match - Replacement of 6035639 MUS CR427 0.03 Intersect: Brush Creek Tributary; BR Eligible for Replacement: Length=26 SD/FO(1) SR=22.3 DSR=5~|~17 - Construction Engineering~|~D6DFD871E8B401BB9D047A99073583AD85864C77 107773~|~1~|~2~|~02/NHS~|~General System Resurfacing: FRA-33-4.35-4.43 FRA-33-4.86-8.77~|~05 - 4R Maintenance - Resurfacing~|~CC522F3B783D938231F2A3F87BCDC629719244EF 107773~|~1~|~1~|~01/NHS~|~Urban Paving in the City of Columbus: FRA-33-4.43-4.86~|~05 - 4R Maintenance - Resurfacing~|~D4B7FB28499F8F5993A1B5C085D074F325FA5922 107773~|~1~|~3~|~03/NHS~|~Items to be paid 100% by the City of Columbus~|~05 - 4R Maintenance - Resurfacing~|~3E51BDF93CCBCF63DF5EE5AD98BFE6A06AD39342 107773~|~1~|~4~|~04/NHS~|~Replacement of the culvert at SLM 7.20 with a larger culvert~|~04 - Reconstruction - No Added Capacity~|~F62BD78A1C4E364F30319C9C9ECEAB46EB5B9588 109012~|~1~|~1~|~01/NFA~|~Culvert replacement at HOL-520-9.85 and 9.89.~|~04 - Reconstruction - No Added Capacity~|~653F3A098AD7F11BF6F099AE3BA1370549203428 96971~|~1~|~2~|~02/STR~|~Resurfacing and berm stabilization CR 81 from Burkettsville to SR 119.~|~05 - 4R Maintenance - Resurfacing~|~92C800DD8A72CA6F7D8ACBB790BD5B3DE201AB1C 96971~|~1~|~1~|~01/S<2~|~Resurfacing and berm stabilization CR 170 from SR 49 to SR 118~|~05 - 4R Maintenance - Resurfacing~|~D602534FDFAA0EB3F810F11AB5767212020DB25B 108666~|~1~|~1~|~01/NFA~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5751A9B50189AAB320F2C1C015BE0E24653EF711 121431~|~1~|~1~|~01/NFP~|~Crack Sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E5872C39C1CF37C408148387EE4886120406C09 96633~|~1~|~1~|~01/NFP~|~Upgrade Existing HAR Signs in District 8~|~44 - Other~|~408A6CEC4C6E4AAF747E6C3C3F51116967780DB6 124563~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded roundabout~|~21 - Safety~|~349E993783D580E51F743B4607C10075B9A6FAF3 119608~|~1~|~1~|~01/ERD~|~Plan split for eligible work to replace the structure (bridge SFN 1830988).~|~10 - Bridge Replacement~|~56466FF40E4AE95180EA3CD37523445D9C193F56 89454~|~1~|~1~|~01/BRF~|~"01/BRF/BR/PERR" - Perry County Bridge replacment project on CR41 over a stream utilizing Forest Highway funds with a project cap of $348,000.~|~~|~DB41EA69D35BCF098F0B51B9994522744D8C1575 105208~|~1~|~1~|~01/NHS~|~plan split for the NHS portion of CLE-125~|~05 - 4R Maintenance - Resurfacing~|~0E312CB83CC5259D9BC515AF33696654AE6CE6CD 83031~|~1~|~2~|~02/IMS~|~D6 federal/state funding for minor bridge work on 3 bridges:2513080 FRA IR270 0.14 Intersect: Under Ramp 71Sb To 270Eb2513447 FRA US23 5.17 Intersect: Under Ramp L 23N-270W2513536 FRA IR270 52.64 Intersect: Under Ramp L 23N-270W~|~13 - Bridge Rehabilitation~|~4E4ACF2872A9D53623BE14278F184A34F5762D4C 83031~|~1~|~1~|~01/IMS~|~D6 federa/state funding for pavement repair, ramp resurfacing, minor safety improvements (rumble strips, widen outside shoulder, superelevation) at 270/23 ramps~|~05 - 4R Maintenance - Resurfacing~|~ECD2A1E88E54A9AAD4B950171D801B2C9DD6BD1D 114928~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~0E159C996A9F11D3FA310A4BEB12AC1C350C115F 121070~|~1~|~1~|~01/STR~|~SR 148 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6033ADCE9186CB7875942331D9EFE44F98E2B93B 101107~|~1~|~1~|~01/BRF~|~CEAO funded Bridge Replacement~|~10 - Bridge Replacement~|~8BB5C1D12527DAA34B9A2DE391EC739E4CE8FF02 121415~|~1~|~1~|~01/MPO~|~Federal items.~|~05 - 4R Maintenance - Resurfacing~|~6A5E45A20FCA8F8743A880A60329B545726ADB2C 100738~|~1~|~1~|~01/IMS~|~Spot concrete slab repairs at various locations on FRA IR 70~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~746A3F9420805BCFD375DDD98DC4B81A1E5B660A 105604~|~1~|~1~|~01/NHS~|~NHS plan split: DEL-23-17.75-20.84 FRA-3-20.39-20.71 FRA-3-20.71-21.36, 21.47-21.50,21.80-22.14, 22.18-22.20, 22.26-22.63, 22.64-22.77, 22.84-22.89, 22.91-23.04 FRA-161-17.12-17.30 FRA-33-22.33-24.27 FRA-40-7.00-7.60~|~05 - 4R Maintenance - Resurfacing~|~8D00C9CFC1B0870EF1D487E81E946A06066E9571 105604~|~1~|~2~|~02/IMS~|~Interstate plan split: FRA-270-43.24-48.47 FRA-270-52.16-52.72~|~05 - 4R Maintenance - Resurfacing~|~FDF68E9B1CD0E9781DE29E83151E309FCC99F30D 105604~|~1~|~4~|~04/S>2~|~Columbus urban area plan split: FRA-104-0.00-1.49, 1.66-1.68, 1.73-3.40, 3.68-3.71, 4.08-4.97~|~05 - 4R Maintenance - Resurfacing~|~9E886ED34DE3FDAF50A17A15575CF7F4E7D2147F 105604~|~1~|~3~|~03/S>2~|~Columbus Urban Paving plan split: FRA-3-20.39-20.71 FRA-3-21.36-21.47, 21.50-21.80, 22.14-22.18, 22.20-22.26, 22.63-22.64, 22.77-22.84, 22.89-22.91, 23.04-23.07~|~05 - 4R Maintenance - Resurfacing~|~8EBCC5A79C70EC1F9D1788BA228D59A24C91A9CD 105604~|~1~|~5~|~05/S>2~|~Grove City Urban Paving Plan Split: FRA-104-1.49-1.66, 1.68-1.73, 3.40-3.68, 3.71-4.08~|~05 - 4R Maintenance - Resurfacing~|~8E0DFEE28F8DF6A436018369026E59C4CA63F61E 89835~|~1~|~1~|~01/IMS~|~Phase 8A of the Mill Creek Expressway Project. This phase will replace Bridge No. HAM-75-0701, Seymour Ave. over I-75. This project is needed to allow future mainline construction be completed under PID 77889, Phase 8.~|~10 - Bridge Replacement~|~F490673C1F3B2DBA4F8A69B2DB5200217109DFF9 89835~|~1~|~2~|~02/IMS~|~Reconstruct portions of IR bridge.~|~13 - Bridge Rehabilitation~|~B4E19FBCD52730ED69F5ED78864B7660DE88CA40 108748~|~1~|~1~|~01/SAF~|~Safety money~|~21 - Safety~|~0AA2B53E4A5BD303B7798E70E9FDB6560215EA54 108748~|~1~|~2~|~02/S<2~|~100% City resurfacing~|~05 - 4R Maintenance - Resurfacing~|~F4B8B9ACCF255385A3214638C30FE117F474B93F 121183~|~1~|~1~|~01/NHS~|~Urban paving~|~05 - 4R Maintenance - Resurfacing~|~D93406060350B6CB2C1819AF366D2EFCE98812DA 121107~|~1~|~1~|~01/MPO~|~Primary Plan Split for MPO CRP funded scope.~|~28 - Facilities for Pedestrians & Bicycles~|~41CA92F429BB911C81C6A0E17B0CF4C855433593 111350~|~1~|~1~|~01/NFP~|~Plan split for drainage work.~|~44 - Other~|~485A05E65C486C505D4E4D1B79BFAE84CFC249FA 83923~|~1~|~1~|~01/STR~|~0100870 ADA SR41 5.2 Intersect: Mussel Run80 fed/20 state 01/STR/BR/State~|~~|~7C619FCB284881D2DCAEB5E3C28D07BA0C6E91B2 113066~|~1~|~1~|~01/STR~|~AC Overlay with repairs on: CLE US 50 SLM 7.8 to 8.6~|~05 - 4R Maintenance - Resurfacing~|~76D44862D68359C8DBD50B58855FCEEC98BEF66C 126788~|~1~|~1~|~01/NFP~|~Guardrail repair throughout Franklin County~|~21 - Safety~|~024A172BC797CEDC89219BA959162C6DBA04C01B 94817~|~1~|~1~|~01/BRO~|~Design and replace the existing bridge~|~~|~B55BE3983516E89618E32F2A6DC67A8312159F28 109824~|~1~|~1~|~01/STR~|~HIG 41 0.00-7.36~|~05 - 4R Maintenance - Resurfacing~|~AA721000ACBA31CE7459D78D1C9CCEB56759A254 109824~|~1~|~2~|~02/STR~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~D44E81713AEEEA2236D284CAA05887E6D8D16A83 90438~|~1~|~1~|~01/BRF~|~Project includes replacement of structurally deficient Bridge No. PRE-CR 45-0100 (SFN: 6835414), which serves to carry CR-45 over Paint Creek. Improvements include pavement repairs, and improvements to the vertical alignment/profile of the roadway.~|~10 - Bridge Replacement~|~1DF14F6D508B83510F101732DF4DFF6260AE2FF4 123267~|~1~|~1~|~01/SAF~|~Guardrail maintenance.~|~21 - Safety~|~53583CD56357DF0872964E39AF84D10B7E481772 123267~|~1~|~2~|~02/SAF~|~Guardrail replacement.~|~~|~F73BB0A2B7139FF0E01035EFB0919033F794839B 94122~|~1~|~2~|~02/STR~|~See linked structure > 20'~|~13 - Bridge Rehabilitation~|~707DBF49D2B5540C67F7819DCCD3C5AA6E9098C5 94122~|~1~|~3~|~03/STR~|~See linked structure 10' to 20' span.~|~13 - Bridge Rehabilitation~|~291904D1A85F0C95281C0140C857B8926D8CC374 94122~|~1~|~1~|~01/STR~|~Resurfacing of STA SR 241 from SLM 0.00 to 3.50.~|~05 - 4R Maintenance - Resurfacing~|~B5B7BC8E4241526E1A70D38C49F244A6708EFD08 98363~|~1~|~2~|~02/S>2/BARB~|~Resurfacing of Fairview Avenue from N Van Buren Ave SLM 5.13 to 5th St NE/SR 619 SLM 5.19, in the City of Barberton. 100% city costs.~|~05 - 4R Maintenance - Resurfacing~|~A6964D0A9B3C45FAAF0E752EACD2EBFD446A786F 98363~|~1~|~1~|~01/MPO/BARB~|~Resurfacing of North Van Buren Avenue from Robinson Avenue SLM 0.52 to Fairview Avenue SLM 1.58 including full and partial depth repairs, in the City of Barberton. Resurfacing of Fairview Avenue from Norton Ave/Coventry Rd SLM 4.95 to North Van Buren Avenue SLM 5.13, in the City of Barberton.~|~05 - 4R Maintenance - Resurfacing~|~DFEA663977F9821EDE2F442FADCB3EFAF6A5AE6B 101994~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~EE71573F3A2B713A9C399BE2D338A8993969134D 120545~|~1~|~1~|~01/S>2/HCEO~|~CEAO funded replacement of a Hamilton County Engineer's Office maintained bridge not on the federal aid system.~|~10 - Bridge Replacement~|~CA1270C956031F9EAA3C1D788BE181705BF03604 93900~|~1~|~1~|~01/S>2~|~Resurfacing of CR-98 (Highland Avenue) from Brunstetter Road to Warren Township line, in the Village of Lordstown, Trumbull County, Ohio. Includes guardrail, signs, striping.~|~05 - 4R Maintenance - Resurfacing~|~5D52568699127846F990A19971760585E5800D88 112978~|~1~|~1~|~01/IMS~|~Repair the inverts of the bridge size culverts HAM-71-1351 and WAR-71-0358E. Extend the paved invert to the springline of the HAM-71-1929 bridge size culvert with reinforced concrete.~|~04 - Reconstruction - No Added Capacity~|~7B4A64639DC76FA16E86004D85460BB5DC102E22 112978~|~1~|~2~|~02/IMS~|~Pave the invert of small culvert~|~04 - Reconstruction - No Added Capacity~|~E46EBC6C52BBED25B71A2AC59C5BDDCEFE4938E4 112978~|~1~|~3~|~03/IMS/WCEO~|~This funding event is for the local portion of the WAR-71-0358E structure that is under Columbia road and begins between the NB Exit Ramp and Columbia Rd and ends at the eastern pipe outlet. ~|~04 - Reconstruction - No Added Capacity~|~3B98367DA18AE3517DA1500F88B43C5D1B7D6331 93512~|~1~|~1~|~01/IMS~|~Type B Emergency to resurface the surface course only on the eastbound through lanes of Preble I-70 for 1.5 miles due to multiple delaminations.~|~05 - 4R Maintenance - Resurfacing~|~D5BC9393ED5B15D5BA3B6AF737DEF5A8C4124827 112404~|~1~|~1~|~01/SAF~|~Downtown Safety Project with pedestrian upgrades and streetscape improvements~|~21 - Safety~|~1C2F98320DF103F84A75D36736BC504B2CCD344F 112404~|~1~|~2~|~02/SAF~|~Safety funding for pedestrian improvement related project items of lighting, signal upgrades, and improved crossings (curb bump outs, RRFBS, signage, markings, etc.)~|~21 - Safety~|~D25E49133F73DFB6C4884AF7E91ED89C76C98A52 109973~|~1~|~1~|~01/NHS~|~Signal upgrade.~|~21 - Safety~|~4FB17A281B710A4227BFAFAA23193E8BB4E38E52 123503~|~1~|~1~|~01/SAF~|~Realignment of WAS SR 26, WAS CR 17 and Goose Run Road to eliminate conflicts with turning traffic. Work includes WAS 26 3.75, CFN 1885009 culvert replacement and WAS 26 3.76, CFN1807419 culvert will be extended.~|~21 - Safety~|~82A41EAC91420A6241682A1182390177F1270A8A 123503~|~1~|~2~|~02/STR~|~Plan split to purchase conduits per C&MS 109.04.A.2.~|~21 - Safety~|~12B6926085BD44AEBF5B3F83F931FC6D7926ADFB 105634~|~1~|~1~|~01/STR~|~plan split~|~44 - Other~|~44FD0F1A80176493F3CD25BB75D34F306C9F8944 90268~|~1~|~1~|~01/S>2~|~Mahoning Rd 1.69-2.35 Major New Construction Earthwork~|~~|~14536F8E3AB8127AE5DB03650DD0AA3B71E950E2 92960~|~1~|~1~|~01/S<2/PICK~|~"01/S<2/PV/PICK" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving on 1) Fai-SR 256-00.00 to 00.50; 2)Fai-SR 256-02.50 to 05.99;~|~~|~14D63276DE4F0A26A15624C0950BE766CE54C8F0 92960~|~1~|~2~|~02/S<2/PICK~|~"02/S<2/OT/PICK" - District Preservation Marking Pavement Program 4PS7(80% State) / 4BG7(20% Local) - No CAP - Marking Pavements for Urban Paving on 1) Fai-SR 256-00.00 to 00.50; 2)Fai-SR 256-02.50 to 05.99;~|~~|~B6224F9AB9DAA96CC19A940FDA3CEC3E7E6A8B2F 113367~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using CSTP funds. GAL CR 77 0.00-3.254. Funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~8C9A0A77F692C846FFA31DAE571E3CE614E250A0 113367~|~1~|~3~|~03/STR~|~Two-lane resurfacing project using CSTP funds. Rural federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~59B97305266BC33DB8A0F1464D0DEF1EFC4FECBA 113367~|~1~|~2~|~02/S5K~|~Two-lane resurfacing project using CSTP funds. Urban other federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~4551FA0A3DC561BE77793C0A4EF88C0E226FADEB 93287~|~1~|~1~|~01/S<2~|~General system paving in the urban func class areaDEL-203: 0-0.02~|~05 - 4R Maintenance - Resurfacing~|~AA674CA841B083708F17D1010396C4DE3D798AFA 93287~|~1~|~2~|~02/STR~|~General system paving in the rural func class areaDEL-203: 0.02-9.10~|~05 - 4R Maintenance - Resurfacing~|~F659D1947ECA9A36BA967AAF078DE4D86F23C240 94004~|~1~|~1~|~01/NFP~|~Work to replace the bridge. Part of the Federal/State Exchange Program. State funds SAC 4C87 with the match provided by Wyandot County SAC LNTP.~|~10 - Bridge Replacement~|~DC33841402949ECFD8DE31E190C5FA8A9A46BB4C 101016~|~1~|~1~|~01/NFP~|~Repair and resurface park pavement~|~05 - 4R Maintenance - Resurfacing~|~926C00C5C1AB7E0A93940E6ED112EC90CCEE535C 115115~|~1~|~1~|~01/IMS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 77 SB.~|~05 - 4R Maintenance - Resurfacing~|~12980D23DA9C65323C15329231DC6BD512B8C66A 121534~|~1~|~1~|~01/SAF~|~Raised pavement markers~|~21 - Safety~|~090481C819F516DB86CBA8D4D45E1B4BF4BF8FE1 105108~|~1~|~1~|~01/STR~|~SCI 125 2.90 (SFN 7303300) bridge replacement.~|~10 - Bridge Replacement~|~84A7C2383F05F12B8DE8E18709C9CBD8472F8C4B 107518~|~1~|~1~|~01/SAF~|~Installation of signage and pavement markings on local roadways.~|~21 - Safety~|~582B5D6D22526354250153793BE46335B53554A5 81933~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~7E348807B5B1C52D330B9043D4ECB0C4A792F8E4 85377~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds.~|~13 - Bridge Rehabilitation~|~0374DCAAF3A44C0857344C8B61F1D4D63A15504F 111951~|~1~|~1~|~01/NHS~|~UPP - 1 3/4" mill and fill with super-pave asphalt in the City of Urbana.~|~05 - 4R Maintenance - Resurfacing~|~F74F569F7F4E37AAE38AEF8ACCD5DA9011FB1C12 111951~|~1~|~2~|~02/NHS~|~NHS - District paving outside Urbana corp~|~05 - 4R Maintenance - Resurfacing~|~3BC8430AD9A6F21009714FF09BB18C16AA296017 98504~|~1~|~1~|~01/NHS~|~LOR-6-12.36-15.86 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~45686AC1320A1D5931F86C629D3DEA2474B811D1 98504~|~1~|~2~|~02/NHS~|~100% Sheffield Lake Items~|~05 - 4R Maintenance - Resurfacing~|~68F0E256AB0CD3572D4557CB3078B56EC4C25E35 98504~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0C33AC7622224E8AD26DEDA73713D7E857CB217F 96593~|~1~|~1~|~01/NHS~|~NHS route resurfacing~|~05 - 4R Maintenance - Resurfacing~|~28F840A9E042E732B5123367D487D1F0BC5698EF 96593~|~1~|~2~|~02/NHS~|~Split for culvert work~|~44 - Other~|~639E04150C596FE412D2C00EE1CD67DF53A5E4A6 123592~|~1~|~1~|~01/S5K~|~added culvert plan split.~|~04 - Reconstruction - No Added Capacity~|~B75DB8F62E6BEE8F8BCA831ADD981841EDE171EC 93239~|~1~|~1~|~01/MPO~|~Construct a bikepath from Cosler Avenue and Alexander Drive to the Creekside Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~4F1E8382F671C6152B457EDFC0E1242C89228705 111392~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 35 3.47 (CFN 1820878) Liner, GAL 35 3.54 (CFN 1820879) Liner, and GAL 35 9.23 (CFN 1819523) Pave Invert. NHS route funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~82B0FBE20A2A8A1FB7E56198B26DDB1D85FDBD11 115978~|~1~|~1~|~01/S5K~|~Installation of two enhanced multi-use trail crossings. ~|~21 - Safety~|~2D2CC40EAFC78E8C411390E7276D1BF6DE2AABE1 122388~|~1~|~1~|~01/S>2~|~Pland split for construction of all purpose trail~|~28 - Facilities for Pedestrians & Bicycles~|~AE8B21BB057D0DC1F150A2D6B10648792641D1B8 123617~|~1~|~1~|~01/NHS~|~Plan Split for NHS~|~05 - 4R Maintenance - Resurfacing~|~2433BADD21A7C57E9BDE27792D8235A4F852A190 107597~|~1~|~2~|~02/SAF~|~Additional Advanced radar at LOR US 0020 & SR 0058.~|~21 - Safety~|~F54B1EBD0C23949281EB60605FDE532470F52667 107597~|~1~|~1~|~01/SAF~|~Freight Radar Detectors~|~44 - Other~|~6FE06FA64340B32DB11F97411733DAA33329AE83 112393~|~1~|~1~|~01/NHS~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~E9EE17544BBF809164CA5F8CF804750ACCA075AC 113912~|~1~|~1~|~01/IMS~|~Repair and Replace portions of the bridge approach barriers on the ramp from Southbound I-275 to eastbound SR 32.~|~13 - Bridge Rehabilitation~|~9CBB1C05C52BE7766C7DCE94B43E1CE09AFFD69A 123055~|~1~|~1~|~01/STR~|~NOB-CR VAR GR FY29~|~21 - Safety~|~22A5EFD71E546477BDDF79E6015D6A4F5FDA2032 91340~|~1~|~1~|~01/STR~|~General system resurfacing of SR-529 from Marion County line to SR-61~|~05 - 4R Maintenance - Resurfacing~|~36D55B1E21F843DDF448CBA83FA620D9238A7C72 101317~|~1~|~1~|~01/STR~|~Chip seal on the the following STP Rural routes: PIC-188-2.88 to 8.03, PIC-207-0.00-9.57, PIC-361-0.00-4.67~|~05 - 4R Maintenance - Resurfacing~|~EE79D4F2836B06D6C2D04422746BB20DB924356B 101317~|~1~|~3~|~03/NFA~|~Work on FAY-753-0.15 to 5.52. This section is not on the Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~D914155545D17B7ACB305C71E13486238FE73B13 101317~|~1~|~2~|~02/S<2~|~Chip seal on PIC-188-2.57 to 2.88~|~17 - Construction Engineering~|~F3CE2992F6B0A14482CC57AF7AF4AA8294BB8C8A 105343~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 4: Viaduct repairs including deck patching, expansion joint repairs, concrete patching, beam painting, and miscellaneous structural repairs.~|~13 - Bridge Rehabilitation~|~F251DBFC4808AA53CF49A7FC546C3C1C017BCEEF 126656~|~1~|~1~|~01/S5K~|~Bridge repair~|~13 - Bridge Rehabilitation~|~8AD5E1095554E8BDEA73E373346A73EEFC32AD56 126656~|~1~|~2~|~02/IMS~|~Bridge repair on Interstate~|~13 - Bridge Rehabilitation~|~F7C753EFB757EFC167713E3AB161204E9E3FA2D2 88719~|~1~|~1~|~01/NFA~|~4404920 LAW SR775 18.05 Intersect: Trib Of Buckeye Creek100% State. Brdg Replacement. BR funds eligible for rehab only, not replacement. 01/NFA/BR/State~|~13 - Bridge Rehabilitation~|~ABE26459EBFAC19A266A1B1952476D8D6DDFA558 97096~|~1~|~1~|~01/STR~|~Bridge rehab project. Work includes deck edge repair, pile encasement, and erosion prevention. MEG 248 4.28, SFN 5302617. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~E29E62D2862A74EC25265287445139BBD07417E7 100394~|~1~|~1~|~01/BRF~|~SFN 4863186~|~10 - Bridge Replacement~|~3D3DDF82F9941CF4A51FFC6AC4EFD6AE3415B842 120328~|~1~|~1~|~01/NFA/GENE~|~Non infrastructure Safe routes to school.~|~~|~A9A53E70A5990794D412CE8653D8CCDF4990AC1C 97895~|~1~|~2~|~02/S>2~|~CR50 (OC 038) roadway repair and overlay~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~227A751164DA04DE29A2D8686724E75A6A0F087C 97895~|~1~|~1~|~01/S>2~|~CR50 (OC 038) This project will widen the existing 2 lane, 24' wide roadway by adding 4' shoulders on each side for on-street becycling and pedistrian accomodation.~|~28 - Facilities for Pedestrians & Bicycles~|~6B395693224928307EB79247D392FE43DDD596B8 90819~|~1~|~1~|~01/S<2~|~7200625 SAN US6 18.83 Intersect: Us-20 Us-6 Sr-19~|~13 - Bridge Rehabilitation~|~04DA0F3FEE799E154B6FC1B92B68EA137F0A5353 104855~|~1~|~1~|~01/NFA~|~The Port will install approx. 1400' of new roadway starting at the intersection of Jeep Pkwy in the Overland Industrial Park~|~01 - New Construction~|~0212CC90FAC2063EBDCEEEE14D9389CED5601A4E 122439~|~1~|~1~|~01/BRO~|~Bridge replacement~|~66 - Resilience Improvement - Highway Project ~|~B0D75CB5DACA78B5D84B1B735098FB3C2DC505E7 121530~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~8080972D0B84BEE661B9D0CE830DE227EF38423A 121530~|~1~|~2~|~02/S5K~|~STP 5000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~AFAC062C040C7BCC34BA6C67532CA42A0B872E20 109539~|~1~|~1~|~01/NFP~|~Spot paving treatments throughout District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4EB3697959D99745BFEABC032E5DAE4F8E9D0BA8 121482~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E71BE79AA9F26D01A5AC7376E428796764F45378 124694~|~1~|~1~|~01/BRO~|~3 Span box beam super replacement.~|~13 - Bridge Rehabilitation~|~B641BF3E90411DED5C2A2709ED4CC03E16F9935C 101524~|~1~|~1~|~01/NHS~|~Storm Sewer Replacement at HUR-224 and Bullhead Road~|~44 - Other~|~2EA34BE8629ED5EB0141D391CB1A339449CE5904 88972~|~1~|~1~|~01/NHS~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~735EAE9C1558D3098BE6A4F10832429F69E2F7A7 88972~|~1~|~4~|~04/S<2~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 Brdgs F/Rehab:4404041 LAW CR123 0.2 Intersect: Symmes Creek & Cr 123A4404076 LAW CR123 0.2 Intersect: Symmes Creek & Cr 123A80/20 split04/S<2/BR/State~|~13 - Bridge Rehabilitation~|~8FD591AC0E2AA2E86FEFEA74C51B5234EA16C698 88972~|~1~|~2~|~02/NHS~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 Brdgs F/Rehab:4401174 LAW US52 22.53 Intersect: Ohio River4403908 LAW US52 22.29 Intersect: Sr 74403967 LAW US52 22.32 Intersect: County Road 14403991 LAW US52 22.32 Intersect: County Road 180/20 split01/NHS/BR/State80/20 split02/NHS/BR/State~|~13 - Bridge Rehabilitation~|~BC59F61590EF2980D54E34C0DF4C22DA7115DE94 88972~|~1~|~3~|~03/S<2~|~LAW US52 22.16 - 22.62 & SR7 0.00 - 2.30 & SR527 0.19 - 0.56Begin project on US52 @ 22.62 m/m, 1.46 miles west of SR7; continue on SR from 0.00 to dead end @ 2.30 m/m; continue on SR527 80/20 split03/S<2/PV/State~|~05 - 4R Maintenance - Resurfacing~|~C06F317716C936FCB55156569973DB4E29B29DA6 106396~|~1~|~1~|~01/SAF~|~Bike lanes on S. Souder Ave. from Sullivant Ave. to Mound St. Sidewalk on the Buchanan/Van Buren Dr. loop south of S. Souder Ave. and sidewalk on Toronto St. from Trevitt St. to N. Champion Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~61B861006215A74500A7D3A4D0ABDAD92DECA2DC 126654~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & Construction - NEVI Round 3.~|~~|~915A1CA80BD9EA59F9628293ACFB7C1BDA4AEF91 94351~|~1~|~1~|~01/NFP~|~01/NFP/BR ; All work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7.~|~13 - Bridge Rehabilitation~|~48FF351CD07FDD8CCBAF104CE4FA1B740BCAE79D 126402~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~53C81F0D2C83C56FF084D7D615F0D71FA54402DB 125961~|~1~|~1~|~01/STR~|~Slope stabilization STP Rural ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~554BB95F632C29FF8F39172298B6E1CDE2D12988 114286~|~1~|~1~|~01/IMS~|~Mowing contract in D8~|~99 - State Preventative Maintenance~|~998B3AEBF76A02C8ABE5DBA2F009B8ACE0B05ED5 114286~|~1~|~2~|~02/IMS~|~Mowing in MOT Co - D7~|~99 - State Preventative Maintenance~|~7E1D97D7746726717F166DD7F3C1F53FA98846FD 121934~|~1~|~1~|~01/SAE~|~Construct new roundabout.~|~21 - Safety~|~24DFCA30D037FD8D2A1657BEBC1CA31BAAF5F85B 112766~|~1~|~1~|~01/STR~|~Resurfacing SR 9~|~05 - 4R Maintenance - Resurfacing~|~01144B7CF757FA1C582DD98079B54527766FD80B 90822~|~1~|~1~|~01/MPO~|~Construct two types of bike bath which include a 10' wide, concrete path installed next to a street and a 10' wide asphalt path installed along a former railroad route at the Northeast corner of Stroop Road and Wilmington Pike to the Southwest corner of Woodman Commerce Drive and Dorothy Lane (Delco Park).~|~28 - Facilities for Pedestrians & Bicycles~|~6BBC5FCCB8774D3DFB207FB77B37FFAE028592FF 106749~|~1~|~1~|~01/MPO~|~Intersection work at the Edgehill Rd/Overlook Rd intersection that is eligible for federal-aid.~|~21 - Safety~|~0AF575F096EDD3FE8E9911DFBFA2C12C2B2A5246 91901~|~1~|~1~|~01/IMS~|~Spot paving at various locations on FRA IR 71 and FRA IR 670~|~05 - 4R Maintenance - Resurfacing~|~C242B8FA1CBC98EA7D66F72DEF76FC18305CF555 97639~|~1~|~1~|~01/BRO~|~Bridge Repair of accident damage~|~13 - Bridge Rehabilitation~|~66B70045C833787610805495D81FA15D9EBE42B8 92575~|~1~|~2~|~02/STR~|~Widen Ashville Pike from Duvall to Rickenbacker33% of costs attributed to rural func class area02/STR/PV/~|~03 - Reconstruction - Added Capacity~|~11587E0021BCE6C752DD4BEB972E835C43D67A6D 92575~|~1~|~1~|~01/S<2~|~Widen Ashville Pike from Duvall to Rickenbacker67% of costs attributed to Ashville urban area01/S<2/PV/~|~03 - Reconstruction - Added Capacity~|~13FBDA0333AD5637ED928DD96B8D14C6C8B3BF58 117919~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-F ~|~63 - Electric Vehicles & Charging Infrastructure~|~2C120AD290A5AB9992D2B804D346176094D873E7 106254~|~1~|~1~|~01/NHS~|~Concrete deck overlay project. HOC 33 13.13 L & R, HOC 33 14.01 L & R. NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~CBBDA053A2465CD61E1BCB724D91BA96BF15153A 95441~|~1~|~1~|~01/NFP~|~Construction of 7 coverall structures for cold mix storage located at ATH, GAL, HOC, MEG, MRG, NOB, and VIN. Funded 100% state.~|~44 - Other~|~2F8B8F89A9FCAB32842136E71E91697C0331C90D 111671~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2026. Funded 100% state.~|~21 - Safety~|~C5AEC303A3446EFB90160BCCDFCED92696A84FE4 108653~|~1~|~1~|~01/NFP~|~Wooster proposes to extend Daisy Way 2,000? to connect with Old Airport Road creating additional access to the industrial pa~|~44 - Other~|~96D994FFC66BD0BB97189776F363BABB2095BACB 123618~|~1~|~1~|~01/NHS~|~Funding split for NHS~|~05 - 4R Maintenance - Resurfacing~|~F455BB4C58AEB85855B4B170D76D1F83F2D70EAA 118538~|~1~|~1~|~01/NFA~|~Split for bridge replacement work. ~|~10 - Bridge Replacement~|~10847C4690DD4F6451D179FAB1917D3B763F552B 125779~|~1~|~1~|~01/IMS~|~Plan split for HAM 126 19.64~|~13 - Bridge Rehabilitation~|~4E4097DCFB18167CCF19D99FBD2E15F22B28826A 94265~|~1~|~6~|~06/NHS~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Urban portions of SR 48 where the pay items are 100% State since it is outside the corporation limits of the City. (SLM 10.88 to 11.22)~|~05 - 4R Maintenance - Resurfacing~|~09F351A37FB1F502AB0424C5C148A32F68FEB1E9 94265~|~1~|~1~|~01/STR~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Rural portion of SR 48 where the pay items are split 80% State and 20% City. (SLM 10.4 to 10.68)~|~05 - 4R Maintenance - Resurfacing~|~9182EAFF9E4A87A5FA434DF9BDB5ABC4CEA9C5E8 94265~|~1~|~2~|~02/STR~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Rural portion of SR 48 where the pay items are split 100% City. (SLM 10.4 to 10.68)~|~05 - 4R Maintenance - Resurfacing~|~9B7EFCA860AB8DD835453C9AA1FB219B00FCC1B5 94265~|~1~|~5~|~05/STR~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Rural portions of SR 48 where the pay items are 100% State since it is outside the corporation limits of the City. (SLM 10.68 to 10.88)~|~05 - 4R Maintenance - Resurfacing~|~AAA6F9371167997ADB4D185D796A36729B3BDE64 94265~|~1~|~3~|~03/NHS~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Urban portions of SR 48 where the pay items are split 80% State and 20% City. (SLM 10.09 to 10.40 and SLM SLM 11.22 to 11.51)~|~05 - 4R Maintenance - Resurfacing~|~D5BA2DAAE5DBF25976151678625924B8DA3BC8BF 94265~|~1~|~4~|~04/NHS~|~FY2016 Urban Paving Project in the City of Lebanon. This plan split is for the Urban portions of SR 48 where the pay items are 100% City. (SLM 10.09 to 10.40 and SLM SLM 11.22 to 11.51)~|~05 - 4R Maintenance - Resurfacing~|~B2919131238F8F5517D46A0A8F5D4EC607C217E9 93644~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~A473411E37D1965062196817A1BC6C90B8F32D78 84279~|~1~|~1~|~01/BRO~|~Replace existing twin CMP (BEL-800-1362, SFN 0705640) with new twin CMP.~|~10 - Bridge Replacement~|~13CBB12E8A5C1F692DE0F3005BD5FBA70FBFBA26 96808~|~1~|~1~|~01/IMS~|~Pavement split for interstate work~|~04 - Reconstruction - No Added Capacity~|~0F226A48E068E2EBC6F8D4EE2409BABB66D3DDE9 96446~|~1~|~1~|~01/NFP~|~Repair of damaged bridge beams, Hubbard Township, Trumbull County, Ohio.~|~13 - Bridge Rehabilitation~|~4832EB88EB4A2372BB7D04E6C19A228A648A887D 113001~|~1~|~1~|~01/IMS~|~Repair culvert.~|~04 - Reconstruction - No Added Capacity~|~ECAD59FB798AA75BD0BBDB88BB82A27BEFEB00C3 113001~|~1~|~2~|~02/STR~|~Culvert repair.~|~04 - Reconstruction - No Added Capacity~|~9C65B766F7B328C4D07894214524E9FDF0CE1629 82878~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 33 28.68-28.76. NHS route funded 80 federal/20 state.~|~17 - Construction Engineering~|~7737445C576F4DF84F4A66228DF256BA0A48330F 82878~|~1~|~2~|~02/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 124 29.60-38.70. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B2515419779EC6DED85A6177F1DCD653F628BEE4 102151~|~1~|~1~|~01/NFA~|~The City will be engineering and reconstructing an existing road known as West Nationwide Blvd, the newly constructed road will be approximately 1800 feet in length.~|~03 - Reconstruction - Added Capacity~|~39C7CC8DB96DFAED75519A83F60AB49802C7F628 95385~|~1~|~1~|~01/BRF~|~Total rehabilitation of Bridge No. GRE-CR 76-0230, an existing historic timber truss covered bridge.~|~13 - Bridge Rehabilitation~|~528373EE59A5FA6615268DDC9D3ECDE1D535667E 97421~|~1~|~1~|~01/STR~|~Replace two culverts in JEF county. JEF-150-4.97 and JEF-151-1.53~|~04 - Reconstruction - No Added Capacity~|~0A1602D86244C3D922F7C99D0F8C9EA8BD7760BC 116884~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~FB2FDFA9ED2843140B412EEEEA8C5A0E85D6F2BE 116884~|~1~|~2~|~02/NFA~|~Plan Split for Rural Minor Collector~|~05 - 4R Maintenance - Resurfacing~|~FBA61FEC248AC94138710C0869EBE3D8F3F63EE2 109744~|~1~|~1~|~01/STR~|~Resurfacing and related roadway work on COS-79 and minor bridge maintenance.~|~05 - 4R Maintenance - Resurfacing~|~0C461D3E5008065B3FD800441485343D010AACBB 109744~|~1~|~3~|~03/NFA~|~Resurfacing and bridge maintenance work on SR 657 outside of urban area.~|~05 - 4R Maintenance - Resurfacing~|~71A37296F89FE4D7513B7771ADD943F3EDD2086E 109744~|~1~|~2~|~02/S50~|~Resurfacing along SR 657 within urbanized area.~|~05 - 4R Maintenance - Resurfacing~|~ECBC54D7DC38BF75C3D4CED2383E44F0D8AA11B5 22633~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Per-SR 13-00.00 to 17.49~|~05 - 4R Maintenance - Resurfacing~|~CE89B73A77E9B1456C5357B033B2CAFEF60EBA27 93777~|~1~|~1~|~01/IMS~|~Repair/restore expansion joints, patch railing spalls, fix damaged tube railing posts on SFN 7502346 SHE IR 75 1347 TR 57 Meranda Road.~|~~|~E18E28FAA86DA0F7371CA0ABDD1385FB65108F7E 120282~|~1~|~2~|~02/STR~|~Two-lane resurfacing project on WAS CR 375 0.322-2.412. Funded 80% Federal MPO STP/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~98ACF8F52FD5DFFFCE6283C19F042531DFE607F7 120282~|~1~|~1~|~01/S5K~|~Two-lane resurfacing project on WAS CR 375 0.00-0.322. Funded 80% Federal MPO STP/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~D5C538BDA3D3E78D2D19FF9D84790E3777065D1F 120282~|~1~|~3~|~03/MPO~|~Two-lane resurfacing project on Rockland Avenue from Farson Street to Middle Street in the City of Belpre. WAS MR 102 0.00-0.42. Funded 80% Federal MPO STP/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~6BECBABF8B50489F846BA275EA880C17C31FFD6F 97618~|~1~|~4~|~04/BRF~|~Replace MRW TR 132-1.36 (Cardington Denmark Rd) structure over Shaw Creek SFN 5931568~|~10 - Bridge Replacement~|~4BCA3080B446F739B7C2D212D30FDBDB8A8902B4 97618~|~1~|~5~|~05/BRF~|~Replace MRW-TR 138-146 (Curl Rd) structure over Shaw Creek SFN 5931339~|~10 - Bridge Replacement~|~4FF39549C165E2D58717DD8CAE3552C79E09AB8B 97618~|~1~|~1~|~01/BRF~|~Replace MRW-CR 131-0.31 (Tabor Rd) structure over Shaw Creek SFN 5931126~|~10 - Bridge Replacement~|~6FD05B114733AD17DF24A07EE041B03096CED4D4 97618~|~1~|~2~|~02/BRF~|~Replace MRW-CR 137-0.70 (Curtis Rd) structure over Shaw Creek SFN 5931789 & SFN 5931282~|~10 - Bridge Replacement~|~804ACA8BAE95E5D57A5DD571992295BFA968203A 97618~|~1~|~3~|~03/BRF~|~Replace MRW-CR 28-1.08 (Cardington-Denmark Martel Rd) structure over Shaw Creek SFN 5930332~|~10 - Bridge Replacement~|~E46D49E67F49D44AE74EBC4E22D61607752E5BB0 123219~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~08F095367A1FB3897A1B50E0A33CA8151CF8EDF4 99432~|~1~|~1~|~01/NFP~|~Crack seal of various routes throughout District 4.~|~44 - Other~|~9B507504E97B2FF8CFF7F59071D4A2062054517C 93441~|~1~|~1~|~01/CMQ~|~Signal coordination on State Route 59, from Scranton Street to King Street, in the City of Ravenna.~|~21 - Safety~|~0DAFA7A25DA363BF798D648B6B5ADC2B02997C61 114824~|~1~|~1~|~01/NHS~|~Installation of center line rumble striping on US 22 & US 250 in Harrison county.~|~21 - Safety~|~80E7B20BDC762118D13F44F2A17CCD35257350F9 122838~|~1~|~2~|~02/SAF~|~Plan Split for work on the I-71 & SR-123 ramps. ~|~21 - Safety~|~3F5B399E2B2CDCAC06CC4E53616EF1707FD583A8 122838~|~1~|~1~|~01/SAF~|~Widen shoulder and adjust superelevation on SR 123~|~21 - Safety~|~5318F55C69CC4CBB5146FD97342C7B11A2E8B8BE 113136~|~1~|~1~|~01/NFP~|~The County will improve 2,021 feet of Phoenix Road as well as upgrade the intersections of Phoenix Road and North River Road, Phoenix Road and Larchmont Ave, and Phoenix Road and Commonwealth Avenue.~|~44 - Other~|~A2E37F10B1BB9AAC96C3E8B526AA620507739A92 117339~|~1~|~1~|~01/IMS~|~All work associated with SFN3111385.~|~13 - Bridge Rehabilitation~|~2C448E442BF9B3AE6CD2ED3B05F8DA8D8055BC94 103417~|~1~|~1~|~01/MPO~|~Chessie Circle Trail CMAQ funds~|~28 - Facilities for Pedestrians & Bicycles~|~5550F0597BCFD12D7934D8A0CB8CBFF3B6C7F50B 120919~|~1~|~1~|~01/SAF~|~Plan split for lighting work~|~21 - Safety~|~657AE6B6525903B10D61FCCC6A7902C8FE820264 90422~|~1~|~1~|~01/MPO~|~80% Federal MPO STP / 20% Local funding split for the resurfacing of Columbia Road.~|~05 - 4R Maintenance - Resurfacing~|~2F758CA865D1E813700844EDB35B2EA43CB4FCF2 96736~|~1~|~1~|~01/BRO~|~Block PID funding~|~44 - Other~|~1A9E52F6D3271A2D26A355C88EA38FAB27AB4F82 95800~|~1~|~1~|~01/STR~|~WOO-582 from SLM 5.34 to SLM 16.35~|~05 - 4R Maintenance - Resurfacing~|~5B69CDEB7EFB716DDCF10A431C3FD278CAA204F9 106216~|~1~|~1~|~01/STR~|~Milling and Resurfacing with area improvement on North Fairfield Road within the City of Beavercreek.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8A00AA1BECF8A774D4FA9E21AD254BCF5162D86A 87513~|~1~|~1~|~01/BRO~|~Bridge replacement project. MEG 325 0065 (SFN 5302730). Bridge on system eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~B2E5833D0835E5C44EF9AAE46E8BD1E06144B44C 116528~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~B266CE514B723F0C0E6C605DB1C071A1E3871FB1 114475~|~1~|~1~|~01/MPO/SPR~|~Reconstruction of Northland Boulevard from the Springdale corp. limit west of SR 4 to West Kemper Road. Addition of sidewalk where existing gaps exist. Reconstruction of the traffic signal at Tri-County Parkway.~|~04 - Reconstruction - No Added Capacity~|~C91812702BB9971E1204015249D7E71D42D4FD41 114475~|~1~|~2~|~02/ENH~|~Adding 1st priority 4BG7~|~~|~6C5890AA1EB4AFBC00ADEB4C9A3D37C0D811278F 114475~|~1~|~3~|~03/MPO/SPRD~|~Plan Split for 100% City items.~|~04 - Reconstruction - No Added Capacity~|~279C569CDA8743361E05FC6075A3800FFEB48568 110636~|~1~|~1~|~01/STR~|~Bridge Replacement PIK 335 20.41~|~10 - Bridge Replacement~|~6D8B14937B78E3959CC89396FD6B0400CE6AB444 93816~|~1~|~1~|~01/STR~|~Resurfacing of CH-09 in Boston Township. Includes improved shoulders, pavement repairs as necessary, catch basin repairs as needed, new pavement markings, guardrail upgrade. From Boston Mills Road (CR-32) to Cuyahoga County line. SLM 13.35 to SLM 14.58.~|~05 - 4R Maintenance - Resurfacing~|~510655986C3901664FBE7C45CFE87E0F32497683 89064~|~1~|~1~|~01/NHS~|~80/20 fed/local funding split using federal Local Bridge Program and MPO STP funding. No existing SFN available.~|~10 - Bridge Replacement~|~2139B55B0F582321A6053AC3FCE831ADF0301B49 89064~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding.~|~10 - Bridge Replacement~|~C1AC0E74EBDBC6B087CE50B4D4CE792928D1091B 97158~|~1~|~1~|~01/STR~|~Bridge replacement project. ATH 691 6.42, SFN 0505552. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~373B3762C6541C1DB42842FFDC2F77F90A5E2F31 122570~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ eligible funding work for cargo processing and fiber connectivity of the terminals.~|~44 - Other~|~4DCCE89E2F383D1C330F54B8EABF2B6CE629B878 107933~|~1~|~1~|~01/STR~|~Resurface on US127 using district preservation funds (80% Fed and 20% state).~|~05 - 4R Maintenance - Resurfacing~|~F4613B0B77E7D134F03D8C8FE3AA4DAB724F7F37 107933~|~1~|~2~|~02/S5K~|~All resurfacing work from SLM 12.346 to 12.395 that falls within the Van Wert urban area boundary.~|~05 - 4R Maintenance - Resurfacing~|~F328A53A205F99D0B0F1EC33BBCA7621679B1F97 107933~|~2~|~3~|~03/S5K~|~Resurfacing in the City of Defiance using 80% federal preservation funding with a 20% city match.~|~05 - 4R Maintenance - Resurfacing~|~1AAE36AD0E72CE8E1A30C45F9EBE210065CC430B 107933~|~2~|~4~|~04/S5K~|~100% city cost items such as turn lane arrows and crosswalk markings.~|~05 - 4R Maintenance - Resurfacing~|~8BF795F75532CA6791DB1BF38474541CE5FDC0D8 108140~|~1~|~1~|~01/MPO~|~Resurfacing of Ravenna Rd from Twinsburg S Corp to just north of Old Mill Rd.~|~05 - 4R Maintenance - Resurfacing~|~08DA28D67C7FF88543150C205B8823614A415433 110682~|~1~|~1~|~01/STR~|~Replace Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek.~|~13 - Bridge Rehabilitation~|~0CE450AB1EC6CA38081A5901EE983F60BCA52E48 101785~|~1~|~1~|~01/NFA~|~The city is constructing a 1,092 linear foot road to give access to the new Quadax facility from Fry Road.~|~01 - New Construction~|~A840162342C000042AA4621D03F3756F7E939B0E 98524~|~1~|~1~|~01/NFA~|~All work is in this split. Funding is 100% state funds from the District Preservation Program. SAC 4PS7.~|~13 - Bridge Rehabilitation~|~C288745D44036DBC3B871A76A909A78757837CC7 100744~|~1~|~1~|~01/IMS~|~Work related to heat straightening of beam on FRA-40 structure.~|~13 - Bridge Rehabilitation~|~99CD8558F2B3DD262838B5371E7BFE5F768EE04F 100744~|~2~|~2~|~02/NHS~|~Split for work on UNI-31 over UNI-33 structure.~|~13 - Bridge Rehabilitation~|~716DC470E2C15EE133FD1C289CA82FB0537AD036 112962~|~1~|~1~|~01/IMS~|~FRA-71 from 5.29 to 14.96 and 16.83 to 17.10~|~05 - 4R Maintenance - Resurfacing~|~1B6420E6D21A8A4C578BA0F9B7E7BD5CB490A47D 87742~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~~|~C38001555299DF93AFBA50B3F2820D36852DB030 118571~|~1~|~1~|~01/STR~|~Full depth flexible pavement project. NOB 821 8.31-8.63.~|~05 - 4R Maintenance - Resurfacing~|~195B1D9A55B965B95E46D6B9EC272F5A7281952F 118571~|~1~|~2~|~02/NFA~|~Full depth flexible pavement project. NOB MR 43 0.296-0.356. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~19CFFFEA039AED17BCDAEC728FF9977F7102CFDA 100235~|~1~|~1~|~01/NFP~|~Chip Sealing ATB US 6 from 23.17 to 25.18, ATB SR 7 from 14.95 to 17.51, ATB SR 193 from 11.09 to 14.57 and TRU SR 609 from 0.00 to 2.65.~|~99 - State Preventative Maintenance~|~C8867FD4C8051F742D9982213E9B919738F79AE8 94380~|~1~|~1~|~01/STR~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9BA843D184CCD20BD5A9D892478F5FE54425127D 116939~|~1~|~1~|~01/MPO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~86DC4760651967FF3DE0B6FDD35BE5E82D54B0C4 88215~|~1~|~1~|~01/MPO~|~Construct A 10' Asphalt Multi-use trail from the UD parking lot to Jane Newcome Park.~|~28 - Facilities for Pedestrians & Bicycles~|~5A12B1FBE2831A846D7CE42731ABBF3A6829CEFA 124661~|~1~|~1~|~01/NFA~|~Bridge Rehabilitation~|~~|~77C3A20F87EE630E7C3C6EFE41E5C4C7F204480F 104739~|~1~|~1~|~01/SAF~|~Intersection improvement on Portage Street between Frank Ave and Whipple Ave.~|~21 - Safety~|~9712B73E08630F38A98A07A0D717CAD10E26304A 114635~|~1~|~1~|~01/STR~|~Overlay on SCI 772~|~05 - 4R Maintenance - Resurfacing~|~63F3347413A4DA1BEDEFAAACA7B4CE1064B1E647 90357~|~1~|~1~|~01/S<2~|~Culvert Replacement~|~44 - Other~|~5E5D40627D7CD65B95D77844E58268EC43260566 108614~|~1~|~1~|~01/NHS~|~Landslide repair project. WAS 7 40.30. DSR WAS-016. NHS route funded 80% federal/20% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~44A83FC130FE4B93D9B09BFCFE43DE017C32C1B6 99756~|~1~|~2~|~02/NFP~|~Split for 100% local items.~|~~|~9C44472494DE0A17E7C78D3DE752D1F745697C45 99756~|~1~|~1~|~01/NFP~|~100% State funded rehab work on the Hope Memorial bridge.~|~13 - Bridge Rehabilitation~|~649E7326C8F3E4C9C46787E657FBECCDF7CB36B5 79761~|~1~|~2~|~02/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~8AF6E761E25EA57F62D46BBB789DA7D27A5E1F11 79761~|~1~|~3~|~03/NHS~|~NHS Bridge~|~13 - Bridge Rehabilitation~|~46F93AF6BB60A11171769B7BA0ECB4C451CB85DD 79761~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~FB92E2A453E451406C69107842DC7153C55B36E9 79761~|~1~|~4~|~04/STR~|~MED-42-0714 R USR 42 over MED-42-0687MED-42-0261 over W FORK OF E BR BLACK RIV~|~13 - Bridge Rehabilitation~|~B3BEF7826A21A6F634E369A2E342DBBBECC723B6 79761~|~1~|~5~|~05/SAF~|~Wet Reflective/Thermoplastic long line costs for the entire project~|~05 - 4R Maintenance - Resurfacing~|~677745153CCA03C324ACBECAA3F998CA2C53563C 79761~|~1~|~6~|~06/SAF~|~Segment CL rumble stripes : US 42, SLM 1.89-2.79~|~05 - 4R Maintenance - Resurfacing~|~E7F381EDC5AF9386A60169A4C67CC8EFF1CAA8F7 79761~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~855C9AFECC6ACDAA284BC8716B0F058CE8B50250 104881~|~1~|~1~|~01/STR~|~SCI 348 9.42 (SFN 7305559)~|~10 - Bridge Replacement~|~A3EA4F12838D17D9EB35FF9EEC81A49B767B8BAB 110189~|~1~|~1~|~01/SAF~|~Tree removal on various County Roads using 90% 4HJ7 and 10% TRC.~|~17 - Construction Engineering~|~AAE95FD1EA419405C47E80DA0A7108F67DDFB164 125999~|~1~|~1~|~01/IMS~|~Split~|~05 - 4R Maintenance - Resurfacing~|~ABA60D95D0FF3A2A69EADC8435399527229F3D49 98579~|~1~|~1~|~01/BRF/GCEO~|~"01/BRF/BR/GCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - GUE-TR365-860 - SFN 3030768 - BR Eligible for replacement: L=155'; SD/FO=1; SR=26.0; DSR=6; over Wills Creek~|~10 - Bridge Replacement~|~C2BE07C6A8C2ED099DEFDC272347F24269D9DDAC 98613~|~1~|~1~|~01/NFP~|~Drainage improvements to the Pebble Beach storm sewer adjacent to the Ohio Turnpike in Canfield Township, Mahoning County, Ohio. The proposed improvement will remedy localized flooding resulting from filled drainage pipes and will help preserve the Ohio Turnpike pavement in the area.~|~44 - Other~|~1E6791776741EF4E17D964855B7E34052513AA28 91903~|~1~|~1~|~01/IMS~|~Spot repairs on FRA IR 270 and IR 670 (except for 270-38.20 to 38.60 NB)~|~05 - 4R Maintenance - Resurfacing~|~FADD140B5C158FAA304F7F979BE2576CCABC1BD2 91903~|~1~|~2~|~02/IMS~|~Paving FRA-270-38.20 to 38.60 NB only. Work due to damage from truck accident.~|~05 - 4R Maintenance - Resurfacing~|~D23AC7988E41B5F14251D8811C6FA72BB4E34F77 101752~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - Plan Split 1, Gue-209-10.72 to 10.76, Gue-209-10.99 to 11.00, Gue-209-11.03 to 11.16, Gue-209-11.32 to 14.65, Gue-209-14.65 to 15.07~|~05 - 4R Maintenance - Resurfacing~|~2BC82568462E601FB79B17FDDB0BBFF4054ECE56 93044~|~1~|~1~|~01/SAF~|~Widen the curves and narrow sections of GAL CR 6 0.00-1.84. Includes resurfacing, berms, and striping. 80% Federal Safety and 20% Local.~|~21 - Safety~|~4D1ABE6FC7CEE2A5E8E61185B6C205B5D0C607E4 104109~|~1~|~1~|~01/NFP~|~plan split~|~31 - Landscaping & Other Scenic Beautification~|~8E06C7966363BF61AA9D7FEDF839B9B2BDA2ED45 118735~|~1~|~1~|~01/SAF~|~GR project in Scioto County.~|~21 - Safety~|~D0DF2174F6DAAFA3DFEFC3D80D95BFBAE3BFB777 113165~|~1~|~1~|~01/CMQ/TWIN~|~Intersection improvement at Shepard Rd/Richmond Rd/Broadway Ave/Ravenna Rd~|~04 - Reconstruction - No Added Capacity~|~FA0BA317180B3BD634325C55A59FC41F92CDE4C6 113165~|~1~|~2~|~02/MPO~|~This split is for the NOACA funding portion of the project~|~04 - Reconstruction - No Added Capacity~|~6BB79CB3A153D434D111ED79B067BA65E8828D52 83635~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~AE1B9CF08E3B9CE2748357D5CAFDC1348D739432 109308~|~1~|~2~|~02/MPO~|~Carbon Reduction Eligible Items, including 4" Concrete Walk and Curb Ramps. 80% BHJ (TAP) and 20% Local funds.~|~17 - Construction Engineering~|~B316688D74F619B5FF679F37FA094D84697B4BEF 109308~|~1~|~1~|~01/MPO~|~Lovers Lane widening (all associated items other than those listed for MPO TAP split). 80% BHJ and 20% Local funds.~|~04 - Reconstruction - No Added Capacity~|~61D57B6FEAE7F8273C25A4A4837F70351571663E 114668~|~1~|~1~|~01/NHS~|~Placeholder once locations are determined/finalized.~|~44 - Other~|~BC25D752C80C995FAF924C6357AD4EB6693E29B9 117616~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~C025B4E2B5CAEE0CFAF8068C95C7C1ED8446D494 86963~|~1~|~2~|~02/S>2~|~Resurfacing of State Route 82 from SLM 0.00 to SLM 2.38 in the City of Aurora, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~02D5A69EF756686B3A09D2C6EAE3EC0BF645F5AC 86963~|~1~|~1~|~01/NHS~|~Resurfacing of State Route 43 from SLM 20.72 to SLM 23.69 and SLM 25.78 to SLM 26.29, in the City of Aurora, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~F51ADAB63A2C98CD56B91B342A71883F22A34E23 86963~|~2~|~5~|~05/S>2~|~Structure work on SFN# 6703259, POR-SR82-0.74 the branch of the Aurora Pond.~|~13 - Bridge Rehabilitation~|~DF742C86648976377517A818329C8579C00BD9E8 86963~|~1~|~3~|~03/NHS/AURO~|~100% City items along State Route 43 from SLM 20.72 to SLM 23.69 and SLM 25.78 to SLM 26.29, in the City of Aurora, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~A04977A80B816EDE3680DC2E0C18E6B93ECEAFFF 86963~|~1~|~4~|~04/S>2/AURO~|~100% City items along State Route 82 from SLM 0.00 to SLM 2.38 in the City of Aurora, Portage County, Ohio~|~05 - 4R Maintenance - Resurfacing~|~604E505B80B071D6A3C270631E797440E7E62BF1 114602~|~1~|~1~|~01/MPO~|~This split includes all work associated with construction the shared use path from MLK to Blair~|~28 - Facilities for Pedestrians & Bicycles~|~29A4445F9888AE4CFB78DF6021673D0BE47CD25B 110284~|~1~|~1~|~01/STR~|~Resurfacing SR 519 from SLM 6.78 to 7.44.~|~05 - 4R Maintenance - Resurfacing~|~2A456FBE71E5D745833379F8A2472B6B4F14E929 110284~|~1~|~2~|~02/NFA~|~Resurfacing SR 519 from SLM 7.44 to 11.08 (US 250).~|~05 - 4R Maintenance - Resurfacing~|~65A7B90DE0D3F9D7A31C4B7F95E6DB4688C6BC5C 110418~|~1~|~1~|~01/NHS~|~Resurfacing and other related work along SR 13~|~05 - 4R Maintenance - Resurfacing~|~324058EE8649E008FB510BF217D247071A7919E1 88687~|~1~|~3~|~03/STR~|~Remove and replace the wearing surface as well as expansion joint repair.~|~13 - Bridge Rehabilitation~|~986E0AE38D67CDA0EDDC187D954C6E042B6B01F0 88687~|~1~|~2~|~02/STR~|~Br. MER-119-0252 - repair bridge by removing and replacing deck edge to reinstall bridge rail damaged by accident~|~13 - Bridge Rehabilitation~|~4A3182819B5446EA6772CE0D83016CE9C3AF22B3 88687~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete on MER-SR-119 0.00 to 8.54 MER-SR-118 24.75 to 27.09 MER-SR-118 21.99 to 23.77~|~05 - 4R Maintenance - Resurfacing~|~AF7D757B00B45259FBB0FF61F56ACA48A1D5D783 107502~|~1~|~1~|~01/NHS~|~Resurfacing BEL-7 and JEF-7~|~05 - 4R Maintenance - Resurfacing~|~D0B526C4B9D8D1AEF388932578DA32E150CF9637 85320~|~1~|~1~|~01/S>2~|~Construct new 0.76 mile three lane roadway connecting SR 123 and SR 63 on the west side of the City of Lebanon. The new alignment will be designated as SR 123 and existing SR 123 will be renamed.~|~01 - New Construction~|~D33D31B38732089304726943ADB067CEF30D1D88 105416~|~1~|~1~|~01/IMS~|~Bridge rehab/repair on Interstate bridges.~|~47 - Bridge Preventive Maintenance~|~9A2E86ADD4461C12455F65EA815F156C37EE14BD 105416~|~1~|~2~|~02/NHS~|~Bridge repair/rehab on NHS bridge.~|~47 - Bridge Preventive Maintenance~|~0E14FD92284F607CF91AE5E85345957D82691C6A 105416~|~1~|~3~|~03/STR~|~Bridge rehab - rural~|~47 - Bridge Preventive Maintenance~|~C399459499AEDBFC5F788C30E2E20B93B33FE01D 120607~|~1~|~1~|~01/IMS~|~Replace Cleveland (SR 3) structure over IR 71~|~10 - Bridge Replacement~|~1031688C9E9B5B1E489D8F8BDFF81742D858DFC4 92751~|~1~|~1~|~01/STR~|~8602166 WIL SR107 5.66 Intersect: Eagle Creek~|~13 - Bridge Rehabilitation~|~22A937E9ED3FFF0455AE62F9106820A17E722FDE 105727~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~~|~B8CDA41D3C0C29FAC83DE9A7F6DC9FCD18CBF05B 119484~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing State Funds via the Fed/State Exchange Program at 80% up to CAP.~|~10 - Bridge Replacement~|~8839656978A2E6BE43B5ECB7083FB3B72F09FEBC 101623~|~1~|~1~|~01/ENH~|~Work funded with federal funds through the Transportation Alternatives Program. 95% federal funds using Toll Revenue Credit (TRC) with the 5% match proviced by Wyandot County. Funds needed over the cap will be provided by Wyandot County.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~7EFF02943DC865F1AE89AD6E593BAA04E233AE02 127124~|~1~|~1~|~01/SAE~|~Plan Split for all federally funded items within PID 127124. ~|~21 - Safety~|~86D02B9C5C8ABE2A99F6D8B73500AC75D8E454DA 122743~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~13A5DB25CB9443C8630475247EF4A16C90A064A9 93141~|~1~|~1~|~01/STR~|~District Preservation Paving Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on OFAH-Rural portion.~|~05 - 4R Maintenance - Resurfacing~|~6B478CBC1E7E6CED6A2A7459A52D52C738CD781A 93141~|~1~|~2~|~02/S<2/COSH~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP - Urban Paving resurfacing with related work In the City of Coshocton on SR 83~|~05 - 4R Maintenance - Resurfacing~|~4E58C1579068EC2E2536F16CA36F133D1C323F99 93141~|~1~|~3~|~03/S5K~|~District Preservation Paving - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on OFAH-Urban portions of SR 83~|~05 - 4R Maintenance - Resurfacing~|~5A29E0722F29157E839C9AA20D9C26A5C284A922 125856~|~1~|~1~|~01/IMS~|~IR ROUTE~|~05 - 4R Maintenance - Resurfacing~|~EA2560ECC90E07368B3227F6B776D3A3CF979BD4 110170~|~1~|~2~|~02/S<2~|~Jack and bore conduit - DAR-127-13.67 - CFN 1841200~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6E0211DD5F51837D505A8883EF05226B3D1C1468 110170~|~1~|~1~|~01/STR~|~Structural spray lining of conduit - DAR-121-12.80 CFN 1841197~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~49E670947A14BA729F1FCB425EA388A3CB0148FE 107849~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-521-7.86-13.62~|~05 - 4R Maintenance - Resurfacing~|~B2F4208FFC96369FC4876BF6F7680A261460C667 112857~|~1~|~1~|~01/S<2~|~FAY 22 from 6.26 to 7.25 and FAY 62 from 11.05 to 11.88~|~05 - 4R Maintenance - Resurfacing~|~B9A330F9F749DF76E3D70A8EAB046D5BEC72F4B4 112857~|~1~|~2~|~02/STR~|~FAY 62 from 0 to 10.78 and FAY 435 from 0.00 to 0.97~|~05 - 4R Maintenance - Resurfacing~|~EAADA055292550A2F978CA5897928A91653EBF1D 117184~|~1~|~1~|~01/SAF~|~Primary plan split for all safety eligible items~|~28 - Facilities for Pedestrians & Bicycles~|~1D14748D30983218B14E33131330F14AA62B7434 115024~|~1~|~1~|~01/NFP~|~Resurface various Toledo Metropark locations~|~05 - 4R Maintenance - Resurfacing~|~7B5462D65981FDA82D859E95730B61925099E3D9 110013~|~1~|~2~|~02/S>2~|~plan split for the large urban section of WAR-123~|~05 - 4R Maintenance - Resurfacing~|~204705356EB7B9E916AD7BC3EB4D559F6D174618 110013~|~1~|~3~|~03/S5K~|~plan split for the small urban sections of WAR-122 and WAR-123~|~05 - 4R Maintenance - Resurfacing~|~A2584C525A807E1B7020B07E0F9BD3D1E164D71A 110013~|~1~|~1~|~01/STR~|~Work on the rural section of WAR-123~|~05 - 4R Maintenance - Resurfacing~|~984CDB882C343826B965F98FDB5B1911C977DF59 124873~|~1~|~1~|~01/SAF~|~Split for CEAO Safety funding~|~21 - Safety~|~591485B38B0EE14F42D70DB4FC11E99CCDD208D6 110727~|~1~|~1~|~01/STR~|~All work to resurface SR 199 in Wyandot County in the rural area. Work between the north boundary of the Upper Sandusky Urban Area at CR 47 at SLM 7.35 to 14.22. District Preservation Program funds.~|~05 - 4R Maintenance - Resurfacing~|~3BAA9592C2BFCDEDA437E3A16871F7146A641E2C 110727~|~1~|~2~|~02/S5K~|~Work to resurface SR 199 inside of the Upper Sandusky Urban Area but outside of the City of Upper Sandusky. Beginning on the left side of the road where SR 199 leaves the City at 6.31 to 6.38, then on the right side from 6.37 to 6.60, then on both sides from where SR 199 leaves the City at 6.77 to 6.91. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~C4153E53167175C370A7C2F31B1F0277B358D475 110727~|~1~|~3~|~03/S5K/USAN~|~Work to resurface SR 199 inside of the City of Upper Sandusky. Starting at the beginning of the project on both sides of the road from SLM 6.24 to 6.31, then on the right side of the road from 6.31 to 6.37, then on the left side of the road from 6.38 to 6.60, then on both sides of the road from 6.60 to 6.77, then on both sides of the road from 6.91 to 7.35. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Upper Sandusky.~|~05 - 4R Maintenance - Resurfacing~|~3DDAE112E7824974B0817E5DCBA6EFFDB0DF23C7 110727~|~1~|~4~|~04/S5K~|~100% City Items - Work to resurface SR 199 inside of the City of Upper Sandusky. Starting at the beginning of the project on both sides of the road from SLM 6.24 to 6.31, then on the right side of the road from 6.31 to 6.37, then on the left side of the road from 6.38 to 6.60, then on both sides of the road from 6.60 to 6.77, then on both sides of the road from 6.91 to 7.35. ~|~05 - 4R Maintenance - Resurfacing~|~2352285A6EA286DF58A1D4C86CF639240C0BC0B1 102207~|~1~|~1~|~01/NFA~|~LAW CR 6 6.89 ER Slide repair.~|~44 - Other~|~E7CC42157944FFC8463FDEFEB473C02B1DB697E1 96531~|~1~|~1~|~01/IMS~|~Generic Plan Split for construction inspection for FY2019/2020 (B)~|~17 - Construction Engineering~|~5E594E2BABE3A6F02A8D650D91BC5F4CADB3C920 112850~|~1~|~1~|~01/S>2~|~PIC-674 from 8.96 to 10.93 & FRA-674-0.00-1.99~|~05 - 4R Maintenance - Resurfacing~|~7EB4BDF3C081FE4C7E5A670584165FF579F72C83 112850~|~1~|~3~|~03/S>2~|~Install reinforced soil slope along southbound SR 674~|~04 - Reconstruction - No Added Capacity~|~B951E352B16AC545E36C480A2798DC343E8D2D1A 112850~|~1~|~2~|~02/STR~|~PIC-674 from 0 to 8.96 & FAI-674-0.00-0.40~|~05 - 4R Maintenance - Resurfacing~|~0CED45C24EC979548BC0C4E743D169B58CB4E4FF 116848~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6BBD592FB0F139A4CFAFC2FE91208D1B206C8614 108328~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. WAS 339 22.65. DSR WAS-012. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CFA652676D411F40E3033174069099613DFABAB3 77793~|~1~|~1~|~01/NHS~|~Replace Bridges GRE-4-0090 L/R, SFNs: 2900033 and 2900068that carry SR 4 over Union Rd including raising of SR 4~|~10 - Bridge Replacement~|~582F0F69C7B399BB8D58E9FF6AF09970E42FD064 98863~|~1~|~1~|~01/NHS~|~Project involves the repair of two steel beams on bridge JEF22-0590 (SFN 4101804). The beams were damages as a result of underbridge hit and will be heat straightened.~|~13 - Bridge Rehabilitation~|~0E7B3E4967725AFEF2CB6AA766B752DAB9EA1E27 87841~|~1~|~1~|~01/STR~|~ROS CR 207 0.00 - 7.44 Pavement ProjectIt is proposed to use CSTP funds to resurface 7.44 miles of CR 207 in Ross County with 2 inches of asphalt and 2 ft aggregate berm and pavement markings in FY15. CEAO funded 80/20 split w/Ross Co. as local match. ~|~05 - 4R Maintenance - Resurfacing~|~A166A2A63B43AF3E8C7E4E5DC80EBF34AF74F76F 83652~|~1~|~2~|~02/STR~|~Culvert ReplacementOn SR772, 0.4 mile north east of it's intersection w/CR175 (Liberty Hill).01/STR/OT/State~|~04 - Reconstruction - No Added Capacity~|~29D28F5CAB891206C535D3BD4EBE7BC38BDDD890 83652~|~1~|~1~|~01/STR~|~Slide repairOn SR772, project begins 0.4 mile NE of it's intersection w/CR175 (Liberty Hill). 01/STR/OT/State~|~04 - Reconstruction - No Added Capacity~|~87DCE20CC177605BC88D75FA6A24F40BC9CCC9E9 110594~|~1~|~1~|~01/BRO~|~All work to replace the bridge. Federal and state funds from the District Preservation Program budget. No local funds.~|~17 - Construction Engineering~|~A87C973138538FD0782BBCB3290AFCC3D8119CF6 110594~|~1~|~2~|~02/BRO~|~Slip-Line on Term-Contract, non-let. May cancel this project and add to future D01-TCM-FY31 project~|~13 - Bridge Rehabilitation~|~1919D13FA323C05FC3AA909212408F60E3D11779 112892~|~1~|~1~|~01/NFP~|~City of Napoleon will improve and widen American Road from Industrial Ave to Oakwood, improve that intersection, improve and widen Oakwood Ave to Freedom Drive.~|~44 - Other~|~ED2C85701D4DED2508D40E1D5C265B73D799452E 90647~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~951E55CF00F0D449E4DCCFAFD5988C2A9CAF33EC 100196~|~1~|~1~|~01/NHS~|~For all urban paving eligible items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A792BE618A1B5CB63F8473C3D2F22026C5E3A1D1 100196~|~1~|~2~|~02/NFP~|~For ineligible urban paving items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D40887B84618E183F112DE793DAC28EB297A860 124459~|~1~|~1~|~01/IMS~|~Bridge deck replacement on WAS 77 0.30, SFN 8402949.~|~13 - Bridge Rehabilitation~|~A8F6496EAE91B0FAB89922D74EDF9E7E9843FB3D 113533~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~5CBAA126AC9FAC3890D86119290F0F7CCFA40E45 103747~|~1~|~1~|~01/SAF~|~Add pedestrian signals with back plates and two road diets at high priority locations throughout the Akron Public School District~|~21 - Safety~|~F2B47D699A82D779A2747652D8B29FA14DF8D9A1 92566~|~1~|~1~|~01/STR~|~Replace retaining wall on SR 31 by Bokes Creek~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B477D2A9691D834A4418FA8F164417C3BDFDFC93 91330~|~1~|~2~|~02/S<2~|~Urban func class area and rural pavingMAR-529: 0.46-2.8002/S<2/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~24768C503B829E614F3841C7B7588829A36C54EC 91330~|~1~|~3~|~03/STR~|~Rural func class area and rural pavingMAR-529: 2.80-9.2903/STR/PV/~|~05 - 4R Maintenance - Resurfacing~|~37E75AA69EF3CEF3CEC0B1FA600305C7C32629E5 91330~|~1~|~1~|~01/S<2~|~Urban Func class area and urban paving in Marion CityMAR-529: 0.00-0.4601/S<2/PV/F_LC~|~05 - 4R Maintenance - Resurfacing~|~4559B90498FEFA66E4CD68C37FD8E77F58B8B6FA 103718~|~1~|~1~|~01/NHS~|~Intersection improvement.~|~21 - Safety~|~7444BFC4DF1E6625DADBE8228A2096BC1070A4DC 121605~|~1~|~1~|~01/IMS~|~Pave culvert invert. WAS 77 12.803 (CFN 1810418). Interstate route funded 90 Federal/10 State. ~|~04 - Reconstruction - No Added Capacity~|~85A449276DC83CC21BAA1ABCA8B17BCC5C07A246 104667~|~1~|~1~|~01/IMS~|~Work of the reconstruction and capacity addition on IR 75.~|~03 - Reconstruction - Added Capacity~|~0FACCBD08E66438905E538885B687B648FFF77BF 104667~|~1~|~4~|~04/IMS~|~Betterment for the sewer district CSO21~|~03 - Reconstruction - Added Capacity~|~66C95952E9DD59CD8B576960ACFC6BC61E900542 104667~|~1~|~5~|~05/IMS~|~Construct access road.~|~03 - Reconstruction - Added Capacity~|~9C3B5B6938D697D4440E4DFFABD09B814C06F656 104667~|~1~|~3~|~03/IMS~|~Bridge rehab~|~13 - Bridge Rehabilitation~|~D36925CD3362A9C481A545FC83B92B9E27D97273 104667~|~1~|~2~|~02/IMS~|~Work for the reconstruction of IR 75 - no added capacity.~|~04 - Reconstruction - No Added Capacity~|~D44C60F356A2DEAD051D61CA1E2752A7403FCBB3 104667~|~1~|~6~|~06/IMS~|~Change Order over contract limits.~|~03 - Reconstruction - Added Capacity~|~4F92E81247B8BE146F28AB0F205B3260D645E48F 104667~|~1~|~8~|~08/IMS~|~The proposed work is currently part of the scope of the 5B construction phase. However, in order to decrease the impact to the travelling public, this 360-foot section of Interstate 74 will be added to Phase 5A. During the October PIAC meeting, the committee expressed a preference for reducing the impact to the travelling public.~|~04 - Reconstruction - No Added Capacity~|~ACC3103BA0900E690090871BF50CD0FEE9FD4F21 104667~|~1~|~7~|~07/IMS~|~Purchase of MOT materials due to slide on project. This split also includes a retroactive change order for fuel price adjustment.~|~44 - Other~|~BD928BA1575B6A4EC4937F727C5940685BEF2E96 92666~|~1~|~1~|~01/MPO~|~Resurfacing CR 709 0.00 - 1.14~|~05 - 4R Maintenance - Resurfacing~|~68CB97D9BD933D4C0650CB5B41EFC97E2B57D476 92495~|~1~|~1~|~01/SAE~|~"01/SAE/OT/ " - Safety Program 4HJ7(100% Federal) - CAP at $1,100,000.00 for Construction Phase- Signal Upgrade replacing back plates, tethers, increasing pole heigths, etc to meet current standards: 1) Cos-US 36-20.70; 2) Fai-SR 37-11.46; 3) Fai-SR 204-00.81; 4) Gue-SR 209-11.73; 5) Gue-SR 209-12.18; 6) Mus-US 40-6.98; 7) Mus-US 40-9.20; 8) Mus-SR 60-14.61; 9) Mus-SR 60-21.57; 10) Mus-SR 146-10.70; 11) Lic-SR 79-6.20;~|~21 - Safety~|~4A60C6204AB528E1766CB4CE7A766F039E58E420 119995~|~1~|~1~|~01/NFA~|~Plan Split for Federal Lands Access Program (FLAP) funding~|~05 - 4R Maintenance - Resurfacing~|~FE91318C203B686110A6445D5114A85EDF7B61BE 110495~|~1~|~1~|~01/SAF~|~Safety Funded Plan Split~|~21 - Safety~|~F06284ED7BF4F68226A0B5F3112C17390B56EE9F 110495~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~87D0ADF86361B39B41C686F508172D9323E67926 101648~|~1~|~1~|~01/STR~|~Culvert Replacements: ASD-58-5.60 and ASD-58-7.75~|~04 - Reconstruction - No Added Capacity~|~77DB512E0CFBF448994B42802A941671119FB10E 123333~|~1~|~1~|~01/SAF~|~Replace and add new sidewalks and SUPs in various locations in the City of Delaware.~|~21 - Safety~|~F8756BAD8CDB54EF50EDCFFD988BCDAECFB3C5F2 95868~|~1~|~1~|~01/NFP~|~@ SLM 11.05~|~04 - Reconstruction - No Added Capacity~|~ADABDB2CA9E16D2D8A5AB66DA95B43CB8122467D 117978~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~EDE50DE609106AA6448003B9B48B09D81D2DFDE9 93953~|~1~|~1~|~01/IMS~|~Construct a new noise wall along the west side of Interstate 75 just south of the U.S. 40 interchange.~|~44 - Other~|~2BF3D574B9F6B8B3804804153B9F3FD6DB387191 112946~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~44 - Other~|~D0FA0495C78951646FAE230D61B51B416F249B35 102435~|~1~|~1~|~01/NFP~|~Plan split for bridge slab replacement~|~13 - Bridge Rehabilitation~|~2AB8E567C1A2197D9985DB36D131C5D5CDFB824F 121997~|~1~|~1~|~01/SAF~|~Improve the intersection of US42, Elsinore Pl and I-71 ramps. ~|~21 - Safety~|~AD8E5E01B0E376BD9ED8B75E5DC4B9EB3618787E 121997~|~1~|~2~|~02/IMS~|~Replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71 and bridge HAM-42-0235R which carries US 42 Northbound over I-71 Southbound, and bridge HAM-71-0822R that carries a ramp from Rdige Rd to Southbound I-71 over Northbound I-71. ~|~13 - Bridge Rehabilitation~|~619EF29AB2F9F46D41F889DC7D326D95A4B15F7C 108708~|~1~|~1~|~01/NFA~|~The COUNTY will improve 0.23 miles of SR 287 by resurfacing and widening to accommodate new turn lanes into a proposed driveway at the entrance into the commercial facility.~|~04 - Reconstruction - No Added Capacity~|~BD8C6B775981B38920364610EB3A95C3EBFDD862 119843~|~1~|~1~|~01/NFP~|~Plan Split 01/NFP/OT/ - 100% 4PS7 ~|~21 - Safety~|~711E1EC1CA77E1B993D59FC8F8DC81CDCF75CF44 82956~|~1~|~1~|~01/NHS~|~Replace existing three span bridge over hike/bike trail with pre-cast structure (sfn# 7707231), SUM-SR91-11.96, in the City of Stow, Summit County, Ohio.~|~10 - Bridge Replacement~|~6A678A76971D6B3249C21F59FA0DE98E54A928EE 82956~|~1~|~3~|~03/NHS~|~Ongoing Engineering associated with Plan Split #1 portion of project.~|~17 - Construction Engineering~|~78B6A3F96C621C03A8390B7DA2BBB05D61985506 82956~|~1~|~2~|~02/NHS/HUDS~|~Milling and resurfacing of SR-91 and Norton Road intersection (SLM 12.05 to SLM 12.30), including curbs and drainage improvements. Sidewalk upgrade. Evaluating turn lane lengths. Evaluate signal improvements. (Actually paid by the City of Stow couldn't change plan split code in time).~|~05 - 4R Maintenance - Resurfacing~|~0D9F09056E8D5A0398E48161478E5CE3B241A612 82839~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay. MRG 284 0.00-4.05. 100% state funded.~|~05 - 4R Maintenance - Resurfacing~|~4948629BC5E146B76605EBEC7D489A1C1984BADF 111641~|~1~|~1~|~01/IMS~|~Rehabilitate structure FRA-670-031 over the Scioto River, US 33T and CSX railroad~|~13 - Bridge Rehabilitation~|~7E80DAB9EC241D052B98DE28EB5305C610070D37 111641~|~1~|~2~|~02/IMS~|~Rehabilitate structures carrying 670 over 70WB & McKinley Ave.~|~13 - Bridge Rehabilitation~|~EE049F21F7522BBD63661005A376060DD7D7C5E9 111641~|~1~|~3~|~03/IMS~|~Plan split for items associated with paving on the interstate (FRA-670-0.00-0.87)~|~05 - 4R Maintenance - Resurfacing~|~E930EB8813CBAE4264D8240BB836FDA613D5720D 110744~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D06B4617EAB887ED8D064EE5A8A98DF30772BAB 118400~|~1~|~1~|~01/SAE~|~Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County.~|~21 - Safety~|~F189C9E47F3A6D67FEB772AA200C5241F922BA47 118400~|~1~|~2~|~02/NFP~|~Plan split for utility improvements funded by Southwest Regional Water District (SWRWD).~|~43 - Utilities~|~AC5E3936C7D91C7AE446C93B5D789A12ED2E2226 122498~|~1~|~1~|~01/STR~|~Slide repairs.~|~66 - Resilience Improvement - Highway Project ~|~F40D12E135296D7F723A9CE0EE021F9A5EE6B257 110862~|~1~|~1~|~01/SAF/FCEO~|~Improvement of four intersections by adding turn lanes and rebuilding signals along Refugee Road.~|~21 - Safety~|~E9ED80F08ECF5874473E6AE9470493BBAAEB30E1 120301~|~1~|~1~|~01/S>2~|~Pedestrian Hybrid Beason improvement on Muirfield Drive~|~28 - Facilities for Pedestrians & Bicycles~|~1B59C6A04828B32289EBC5CEF48E75271EFAFF7B 126091~|~1~|~1~|~01/ENH~|~Construct sidewalks, curb and curb ramps utilizing Federal OMEGA RTPO Funds at 100% (80/20).~|~28 - Facilities for Pedestrians & Bicycles~|~04F31F42DD55EE57C84B8F39B5694C83119D33C8 120403~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C3FBE359E42D61562A3B076BE27998122B365F92 115771~|~1~|~1~|~01/BRO~|~Bridge replacement.~|~10 - Bridge Replacement~|~E27BF6256369A0940002E0A52833D80F5CF28DF1 99621~|~1~|~1~|~01/IMS~|~Rehabilitate bridge TUS 77 1670 (SFN 7902557) by replacing deck and painting structural steel~|~13 - Bridge Rehabilitation~|~081C9AF9F0555A4048573517AD34EBA502B3A641 116612~|~1~|~1~|~01/STR~|~FY2026~|~17 - Construction Engineering~|~5426CF040DAD9E36A71D960A49E761DE0134E39E 116612~|~1~|~2~|~02/STR~|~Inspection in FY27~|~17 - Construction Engineering~|~637BD40EC7B48B4B4CF4E024D2A6A2E05C7B3496 108882~|~1~|~1~|~01/NFP~|~The PORT AUTHORITY will construct approximately 3,800 feet in total of JeRu Park Drive, JeRu North and JeRu West~|~44 - Other~|~48D194F36735B34E9E72E1B2B71C587F57BB5F7E 124837~|~1~|~1~|~01/STR/MACE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~54703992FE66DBF10D3ABAD4F66A1936220F2466 95820~|~1~|~2~|~02/NFP~|~Urban paving ineligible items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0888C6A453C9054316DC7CABF60874FDCBE4DC36 95820~|~1~|~1~|~01/NHS~|~Urban Paving eligible items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E23F359D0B5C0D8C5629ACE13EF73303A74B8795 100244~|~1~|~1~|~01/SAF~|~Provide tyregrip or micro surface treatments on various routes throughout the district that have wet fixed object crash trends. On HAM-562 EB, add slotted drain to fix drainage issues.~|~21 - Safety~|~AE0C73ABF9CBB6FEC402C549BA4D645A11937B66 92675~|~1~|~1~|~01/MPO~|~Resurfacing CR 34 9.83 - 10.41~|~05 - 4R Maintenance - Resurfacing~|~AA194B8343345AAFE8FBD178EA574F7F3975B7C4 98501~|~1~|~1~|~01/STR~|~Resurfacing: WAY-301-3.84-7.79 / WAY-539-8.59-12.74~|~05 - 4R Maintenance - Resurfacing~|~1E3261ACA2C03AA15BCEC151F078581B1B04807B 98501~|~1~|~2~|~02/STR~|~Bridge Work on structure WAY-301-0389.~|~05 - 4R Maintenance - Resurfacing~|~A59915C297854BFE17E657B3F75F4AB99A6F245C 109774~|~1~|~1~|~01/S5K~|~Resurfacing with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~33A075CB96075F624D4EBC88ED7D09C189440474 109774~|~1~|~2~|~02/STR~|~Resurface with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~9BA013063F97FC951A5576D7F6EB85D56D068B40 109774~|~1~|~3~|~03/S5K~|~Reconstruction ~|~66 - Resilience Improvement - Highway Project ~|~AE9CCD0C8327064233471A8C230F1010C6F8D515 120539~|~1~|~1~|~01/SAF~|~Improve the intersection of DEL/LIC SR 37and DEL CR 51 (County Line Rd)~|~04 - Reconstruction - No Added Capacity~|~72FB96EA6592A9AF62FD22E102A97052D1EC7752 96496~|~1~|~2~|~02/SAF~|~replacement of Type A anchor assemblies on various NHS routes.~|~21 - Safety~|~67E9D311659480E8237B6211464C65529E8C3E0F 96496~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement contract for FY 2018. Various routes and sections in D10. Funded 80 federal/20 state.~|~21 - Safety~|~349C346374F717561864E71496CAD6D639BAF350 84292~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - Capped at $1,820,507.00 - For the relocation and associated work to enhance clearance of MUS SR60 6.72-6.92 from the cut rock face.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FF362BAE8A08FDFEA14734E95017B4DD8BF1B48B 25436~|~1~|~1~|~01/IMS~|~District Preservation Pavement Program - No CAP - Resurfacing on portions of IR 70 in Licking and Fairfield Counties~|~05 - 4R Maintenance - Resurfacing~|~B0B0D42D3E9E240D4AD6B20432F8ABC26904B8F8 25436~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - No CAP - Repairs on IR 70 Bridges~|~13 - Bridge Rehabilitation~|~7E6798C50513F9CEF4347A87CFE4A2FC617ABF65 108892~|~1~|~1~|~01/IMS~|~Upgrade DMS signs and supports at various locations~|~21 - Safety~|~EC5523C2FFA420EE63F987EFB2157A6DA994F38E 95571~|~1~|~1~|~01/NFA~|~Jobs and Commerce ED fund to aid the City's bridge construction~|~~|~EA28440FD581EF5F27A8E6E7877BB2116E0B67E5 101120~|~1~|~1~|~01/S>2~|~AC overlay without repairs on:CLA-72 SLM 11.86 to 13.50~|~05 - 4R Maintenance - Resurfacing~|~65664F40E38A25C319E46201EA6F67984C24F70C 112832~|~1~|~1~|~01/STR~|~Resurfacing SR 9~|~05 - 4R Maintenance - Resurfacing~|~A7C1CC8057F99D48D3F0827FC7D38B51725D0E29 105687~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funded using SAC 4PS7.~|~21 - Safety~|~5FC8365768EEF1E400E06C07248CB7F3DDFC5AFD 110943~|~1~|~3~|~03/S>2~|~Plan Split for TLCI work items~|~05 - 4R Maintenance - Resurfacing~|~0AE60413A5EEB574B9729CFF310F150EFF7E56D0 110943~|~1~|~2~|~02/S>2~|~Split for urban paving work in Fairview Park~|~05 - 4R Maintenance - Resurfacing~|~AD311AD2801B78B790B7678436555371896AF5BD 110943~|~1~|~1~|~01/S>2~|~Split 1 for urban paving work in Rocky River~|~05 - 4R Maintenance - Resurfacing~|~280A1A792D170AC034B0DD846710F376F39E2D4F 110943~|~1~|~4~|~04/CMQ~|~Work for CMAQ award to Rocky River~|~05 - 4R Maintenance - Resurfacing~|~1708DD6AA53E62E8AB854B3D80C6D56048F27962 110943~|~1~|~5~|~05/NFP~|~Plan split for non-eligible work at 100% cost to the City of Rocky River.~|~05 - 4R Maintenance - Resurfacing~|~363D53868EBC997561D8102937932B0EC22C9E98 110943~|~1~|~6~|~06/NFP~|~Plan split for non-eligible work at 100% cost to the City of Fairview Park.~|~05 - 4R Maintenance - Resurfacing~|~2582C4A30A4EAE59752AF26E7631F3377E8397EF 98072~|~1~|~1~|~01/MPO~|~6' culvert replacement~|~21 - Safety~|~1A4D5D397095CFFFD618E16DBCF09B25AD284FBA 125882~|~1~|~1~|~01/IMS~|~Resurfacing project using an asphalt overlay treatment. WAS 77 13.19-17.64 Southbound Only~|~05 - 4R Maintenance - Resurfacing~|~351E95F0B9EC7471C6DE45608AB497CE7A455AF5 107936~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 2.84-2.88. DSR MOE-002. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7BAFBF4186ECE0D93E686A73FF384D518C25DF5D 107936~|~1~|~2~|~02/STR~|~DSR MOE-003. Maintenance of Traffic, Signals.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~756AED0A31C25FA056A8AD33F66E0991320F620E 101970~|~1~|~1~|~01/NFP~|~Noise wall construction using 100% state funds SAC 4NW7 from Central Office.~|~~|~C5139A0C59932E0E05960DEE959F012FEDD6C0F0 123040~|~1~|~1~|~01/IMS~|~Generic block PID.~|~~|~7364F37220568844091D2A06DC0413A5022D1DE7 102363~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code.~|~21 - Safety~|~48077606C461DFB0E971FFE4C07A55137F9E058A 100773~|~1~|~1~|~01/IMS~|~FRA County crack sealing on various routes~|~99 - State Preventative Maintenance~|~85273D3A895788E2AA57C80A4E76C0C3A65D8CF4 123416~|~1~|~1~|~01/STR~|~Resurfacing SR 43~|~05 - 4R Maintenance - Resurfacing~|~298DB257F927FAC45B841FD53FEF7E5C72D2814B 94115~|~1~|~2~|~02/NHS/AKRO~|~100% City Items.~|~05 - 4R Maintenance - Resurfacing~|~1E4868BCB21DEB6B77053F32198DC5036FEF2566 94115~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing of SR 91 from SLM 1.81 to 3.89, urban paving 80/20 in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~CD41F3796DB4BC1C93A00A2FAC13B08456F55E63 113579~|~1~|~2~|~02/IMS~|~The addition of a fourth lane in each direction as a result of MOT operations.WAR-75-SLM 11.56 to 12.20MOT-75-SLM 0.00 to 3.00~|~03 - Reconstruction - Added Capacity~|~93144CC8C9909C1A8F00680F16E69DD9C260B9F6 113579~|~1~|~1~|~01/IMS~|~Major reconstruction of mainline Interstate 75. Rebuild the existing pavement full depth.~|~04 - Reconstruction - No Added Capacity~|~FBC619FAE75B47CE0F2466D4EA52BBFCCF9DE7DC 123907~|~1~|~1~|~01/NHS~|~Conduit rehab.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE15CD436E2EFE1F3A637E033E474903397E63BB 121574~|~1~|~1~|~01/S5K~|~Plan split for federally eligible pavement resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~8BF0AD981C7A1A263E241FE687B11D226952B834 99498~|~1~|~1~|~01/SAF/FCEO~|~Fairfield County CEAO Highway Safety Improvement Program Funding - 4HB7 (100% Federal) - See CAP Comments - Replacement of guardrail on CR 154 at 00.65 to 00.75 and on SFN 2330601 over the Hocking River.~|~21 - Safety~|~150F83CC470881ACCC35660114F93D03374EE2AE 110012~|~1~|~1~|~01/NFP~|~RPM~|~21 - Safety~|~2878967EAAF0E3D7556D3A4B197092802FD91010 117725~|~1~|~1~|~01/STR/STCE~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~6E7466B95A5E490ECB733414601BA24A3B22F537 105783~|~1~|~1~|~01/NFA~|~The City of Lancaster will rehabilitate 5,640 feet of S Ewing St. which will include pavement repairs, asphalt surfacing, drainage improvements, shoulder widening, ADA upgrades, pavement markings, and other ancillary items.~|~01 - New Construction~|~2885A6386A3045ACDEEFE8E1B63FE61DFB86B922 101905~|~1~|~1~|~01/NFP~|~Noise wall repair and retrofit along DEL IR 71, DEL US 42, FRA IR 71, and FRA IR 270~|~44 - Other~|~DDAF5962B71CDBAB9A97D27810D44B6E37D91799 114841~|~1~|~1~|~01/STR~|~UNI-SR347-0.00-4.23~|~05 - 4R Maintenance - Resurfacing~|~D34C881E53C45C386E16AD81231F9E1A8E2B80F5 108636~|~1~|~1~|~01/IMS~|~Culvert Reline.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2FAD74B6A094FF1685AECAB287E009F5AD7CB970 112934~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~BBFAEE8B1A3E985CC13431B026A9CF816EA446E3 112934~|~1~|~2~|~02/S>2~|~Columbus urban paving plan split.~|~05 - 4R Maintenance - Resurfacing~|~4C180AF451301868EC939E12E423CB7C843BC2A3 112934~|~1~|~3~|~03/S50~|~Groveport urban paving plan split.~|~05 - 4R Maintenance - Resurfacing~|~2E14EE6A7DD8977D8B36A7826E2EE059161F5E60 102854~|~1~|~1~|~01/NHS~|~D09 Bridge Maintenance FY22~|~47 - Bridge Preventive Maintenance~|~82F11B23CE5BEF78FCA5680E9B62D5F97DA7EA42 101003~|~1~|~1~|~01/SAF~|~This is for the roundabout.~|~21 - Safety~|~E55EFDD333CA0160F66D74D3911D7D0E33FE51D6 101003~|~1~|~2~|~02/SAF~|~Guardrail replacement on SR-199 bridge over I-75.~|~21 - Safety~|~C7E140E311F83E3D2177B05E2F06AA85B760D9BF 97028~|~1~|~1~|~01/STR~|~Spot paving at various locations in District 11.~|~05 - 4R Maintenance - Resurfacing~|~E8C701362847A4879440F46BDA14CC8521377BA8 94208~|~1~|~1~|~01/STR~|~Project to replace small culverts CLI-133-0469, GRE-343-0065, and PRE-127-0917. Pave invert for small culvert GRE-42-1310.~|~04 - Reconstruction - No Added Capacity~|~3D3614D6B23916FC7C75A046EA145D4FF4EB4A67 103133~|~1~|~1~|~01/STR~|~Plan Split 01 created for Construction Engineering in FY22~|~17 - Construction Engineering~|~10089A456F2C554AB34F2C37E14C7BA8D43EEA9C 103133~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY23 Construction Services~|~17 - Construction Engineering~|~9F843DBD09CB9A01C83344669708D95D540B4EF4 109659~|~1~|~1~|~01/IMS~|~Replace deck and superstructure (existing width) on the Courtright Rd over IR 70 bridge. Work includes necessary appurtenances such as roadway and drainage items.~|~13 - Bridge Rehabilitation~|~B18F36C4113AFE1E2643AF4D019372B163034B98 109659~|~1~|~2~|~02/S>2~|~Items associated with the widening of deck & superstructure of Courtright Rd to accommodate pedestrians. Work includes the addition of sidewalk from Groves Rd to Deshler Ave. This work also includes necessary intersection modification to accommodate pedestrians.~|~21 - Safety~|~ED745C7E4636066A4DBF9772CFCDFDAE7BC74E36 85068~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~1FAC43CC1591F884F8034B8AB38FFC54DB3FB719 92511~|~1~|~1~|~01/BRF~|~Structurally deficient and functionally obsolete bridge to be rehabilitate with associated roadway approach work SFN 5452597 MER CR 218 3.37 CR 21 B 3.43 SLM to 3.57 SLM~|~13 - Bridge Rehabilitation~|~785E78BFB880C05D8C764B1A119D3D921ED61F88 99868~|~1~|~1~|~01/IMS~|~Install traffic signal at intersection of Fair Road and IR 75 NB ramps to improve operation.~|~44 - Other~|~656619045438D03D62C7A8D6A33308E8214D08C1 101414~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay to POR SR 82 from 9.13 to 10.64~|~~|~249CFCB36843C98EEA2E3134051549C4A78E3427 101414~|~1~|~2~|~02/S<2~|~Fine graded polymer AC overlay to POR SR 305 from 0.00 to 0.48.~|~~|~4584A292CEEBAC7D0B6FC50027DCA86C5447CCD3 125648~|~1~|~1~|~01/NFA~|~Resurfacing SR 26~|~05 - 4R Maintenance - Resurfacing~|~8A8962752AD8889CB5F5EED35F992FF9D79D2A88 121708~|~1~|~1~|~01/SAF~|~Traffic Signals - Maintenance~|~21 - Safety~|~A30D0D917197F23226C18DAFCC0A6FCE5AF9AE53 121708~|~1~|~2~|~02/SAF~|~Traffic Signals - Capital~|~21 - Safety~|~8F6AAC9DB22A75F569306439958F06A83527900D 121708~|~1~|~3~|~03/SAE~|~RRFBs, high viz ped crossing, and supplemental signal heads~|~21 - Safety~|~BD85752E5D5D7C450D150D7E74EB56EBA7AFF267 109420~|~1~|~1~|~01/NFA~|~Barklow Rd at SR-335 must be extended 2,500 LF north to county property; road will be two 12-ft. lanes with drainage and 60 ft width dedicated RW.~|~01 - New Construction~|~1D5C622B8928D87242C9FC2C49C917B6BA43EE42 121149~|~1~|~1~|~01/STR~|~All Work is within this Split~|~05 - 4R Maintenance - Resurfacing~|~62BE9CA9AB25651FC3C092E0222048777E48F832 113836~|~1~|~1~|~01/NFP~|~Created for TID involvement~|~44 - Other~|~B4334E47C1A8B06E0142336167188AF29E9AF149 121290~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DB901E0ABC8F597CB6A9A3036AD8BC9A44C69D9B 96327~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation Bridge Program 4PS7 (100% State) - No CAP ? Bridge Replacement: 1) SFN 6005349, MUS-SR 208-03.18 Not BR Eligible for Rehabilitation: Length=15; SD/FO = (0); SR = 86.8; DSR = 7; 2) SFN 6005373, MUS-SR 208-04.99 Not BR Eligible for Rehabilitation: Length=12; SD/FO = (0); SR = 67.1; DSR = 6; 3) SFN 6005403, MUS-SR 208-05.32 Not BR Eligible for Rehabilitation: Length=16; SD/FO = (0); SR = 79.2; DSR = 7~|~~|~9844CB767B3CF41C8AF9F4B2FDF7806C7CD9025A 112663~|~1~|~1~|~01/IMS~|~Slide repair west of SR-91~|~66 - Resilience Improvement - Highway Project ~|~F7DCA1C45E5FF11597DAE108D26EE3A586BC2795 109761~|~1~|~1~|~01/NHS~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~7B7E9D4DD022829FE69D449C00AD4E0EB8431648 109761~|~1~|~2~|~02/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9C3B1C9D98584064F8F0245D375A5CE2135C3106 109761~|~1~|~3~|~03/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~93DF50F2188B0CB3A00C7F0FC65F955AC5378F7C 102739~|~1~|~1~|~01/STR~|~Bridge Replacement: RIC-603-13.57 (SFN 7007213)~|~10 - Bridge Replacement~|~5F8D166914564BC3C6669B392601D0ED00C839E2 104970~|~1~|~1~|~01/IMS~|~Plan Split for Bridges FRA-70-0.80 and FRA-70-1.41~|~10 - Bridge Replacement~|~CC356DAB9C8EC70FC8D4F1E71560440CA2CDB926 104008~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. PRE-TR 453-0195 (SFN: 6833861) including replacement of the existing abutments and repairs to the superstructure and deck.~|~13 - Bridge Rehabilitation~|~D5D8844CD19BFF7DA9AC36D24FF9F1D8DEB21665 112478~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 4131886, utilizing 100% federal funds (up to max of $604,000)~|~10 - Bridge Replacement~|~89A19372C980607A23117A594660A230483C79B8 124889~|~1~|~1~|~01/S50/GRAN~|~ Resurfacing and related work of multiuse path along (CR 539) Newark Granville Road in the Village of Granville.~|~28 - Facilities for Pedestrians & Bicycles~|~FAF152E9F44DF651E60D2228497A8E534C400762 124945~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing STP Urban roadway, 0.000 to 0.249, utilizing pavement preservation funding.~|~05 - 4R Maintenance - Resurfacing~|~600D24F0C7D799D67F3343DB7A1F26E6BAA28AA7 124945~|~1~|~2~|~02/STR~|~Plan Split for resurfacing STP Rural, 0.249 to 2.735, utilizing pavement preservation funding.~|~05 - 4R Maintenance - Resurfacing~|~098C99CC8076B4F416A96C56750B1830676F854E 90671~|~1~|~1~|~01/BRF~|~Replacement of two structures. SFN# 7661215, CR-240-6.41 over Waterworks Creek and SFN# 7631324, CR-240-6.47 over the West Branch Nimishillen Creek, in the City of Canton, Stark County, Ohio.~|~10 - Bridge Replacement~|~7AB487FD7E56573F8F9DB915A066856897C84A0A 90671~|~1~|~2~|~02/CMQ~|~See linked structures.~|~10 - Bridge Replacement~|~5D145426CDD463F0732E7DC634BD0201564ED57B 90671~|~1~|~3~|~03/ENH~|~See linked structures.~|~10 - Bridge Replacement~|~6048F77CDB5E8F8F5786E4365DFA3FFBD4169F19 119178~|~1~|~1~|~01/IMS~|~Plan split for RPMs~|~21 - Safety~|~65D9EE4D385CB9ACD583C1E2D4A0B9F5D14003A0 115614~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~E5FB98F5315F48705891D58A675A1C84F99AE8F8 83841~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay. NOB 77 11.07-18.92. Interstate route funded 90 federal/10 state.~|~05 - 4R Maintenance - Resurfacing~|~FF7BEC0EF065F81E68C9EC250DC646CF88503FA7 98306~|~1~|~1~|~01/MPO~|~Mill & fill Oberlin-Elyria Road (CR 231) from SR 511 to Butternut Ridge Road.~|~05 - 4R Maintenance - Resurfacing~|~927C7CBC2F7DBD4AF626D4DFE398F084711D2DA5 114872~|~1~|~1~|~01/SAF~|~Turn lanes, pedestrian improvements and RR signal pre-emption at Sycamore Street in Columbus Grove. Safety program funds will be used first and District Preservation Program funds.~|~21 - Safety~|~FB818AF6454174899907FF4A8CADAE9AA71EB4B3 82262~|~1~|~2~|~02/S<2~|~STP<200,000 - District AllocationLOR SR 10C 0.73 - 0.77~|~21 - Safety~|~1E695C72E58CDA784690926C3E28CC48765D54E6 82262~|~1~|~1~|~01/NHS~|~NHS - District AllocationLOR US 20 8.56 - 16.25LOR SR 10 6.52 - 6.62~|~21 - Safety~|~41F8A0CD6553FD2387BB33079F037072C92D578D 113676~|~1~|~1~|~01/NFP~|~Eligible work to repair and resurface Park Pavements.~|~05 - 4R Maintenance - Resurfacing~|~3D632489623F4754DFC79AD3452836D5F9E7AE07 113676~|~1~|~2~|~02/NFP~|~Split for non-eligible work.~|~05 - 4R Maintenance - Resurfacing~|~0E96CA527B3D351C9A6A6A6BB1C4A9D746DE3762 95976~|~1~|~1~|~01/NFP~|~New 60' x 150' fabric salt building at 6000 tons.~|~~|~952CDEF8F108A611C05B82A997E13AB145DF507C 95976~|~1~|~2~|~02/NFP~|~Loader Building.~|~~|~963802F75CF8069085EDF19B569ACDE208182A30 122236~|~1~|~1~|~01/NHS~|~Resurfacing of SR 16 in the city of Newark and related bridge work.~|~05 - 4R Maintenance - Resurfacing~|~E6EA42BDDAABB2D06A57A8C834CE06C23EE7548A 115610~|~1~|~1~|~01/IMS~|~Mowing~|~44 - Other~|~DD3A73F9145FCF85640A81DB4FC48D5F342CFEB8 123886~|~1~|~1~|~01/ENH~|~Construct sidewalks and corresponding facilities (80% Federal CRP funds & 20% Federal Safety funds). ~|~28 - Facilities for Pedestrians & Bicycles~|~7BA297590620AD64D321E2EF479C383B30281E70 91190~|~1~|~2~|~02/S<2~|~FY2015 Urban Paving for the City of Eaton on US127 through the City of Eaton. The limits are SLM 12.04 - 14.75 - US127 inside the City. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~138E7D23E124403664F1772EFB4540176C86A7A0 91190~|~1~|~1~|~01/S<2~|~FY2015 Urban Paving for the City of Eaton on US127 through the City of Eaton. The limits are SLM 12.04 - 14.75 - US127 inside the City. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~1C2E61FB03B762FFF6E6D49AD628D7119780D123 107210~|~1~|~1~|~01/ENH~|~Rehabilitation of Mill Creek Park bridge.~|~13 - Bridge Rehabilitation~|~CF119D73C2048771E649DD9A19D0AA5B0061E94A 103979~|~1~|~1~|~01/NFA~|~The City will construct a new public road starting at Center Ridge Road and moving southerly approximately 700' before ultimately ending up in a cul-de-sac.~|~01 - New Construction~|~46EC9E595E69CB54D54C9EE98BF42F3E69377BA6 88515~|~1~|~2~|~02/STR~|~Pavement planing and resurfacing of the existing roadway and other roadway related items, drainage/catchbasin, ditch work and fence on DAR US 127 15.89 to 16.56 segment length 0.67 total lane miles 2.50 DAR US 127 9.57 to 9.69 segment length 0.12 total lane miles 0.48 DAR US 36 9.61 to 11.50 segment length 1.89 Total Lane Miles 7.56~|~05 - 4R Maintenance - Resurfacing~|~3D83C6221CD1505AB1E5A848E784FA78C08FC8B5 88515~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing of the existing roadway and other roadway related items. Drainage/catchbasin, ditch work and fence on DAR-US-127 13.16 to 14.98 segment length 1.82 total lane miles 7.28 DAR US 127 14.98 to 15.89 segment length 0.91 total lane miles 3.64 DAR-US-36 11.50 to 13.08 segment length 1.58 total lane mile 6.10~|~05 - 4R Maintenance - Resurfacing~|~A530EE3D3A8595C4A029C5ABDB7FDF3B354ECEF3 102028~|~1~|~1~|~01/SAF~|~Section Improvement - Additional turn lanes at Windfall, SR94 and Medina Line Rd intersections. Signal Reconstruction at six signalized intersections and all signals interconnected.~|~21 - Safety~|~549BB5550C2C5693E2898518E6B3F58EDD98A8C3 102028~|~1~|~2~|~02/NHS~|~Resurfacing Full Width~|~05 - 4R Maintenance - Resurfacing~|~36EC6160C112D9E4FE719DFF84E94F97EB93E20A 102028~|~1~|~4~|~04/SAF~|~SR18 Only - Split 4/1 is additional cost for permanent wet reflective optics (100% 4HJ7 / $1250 per mile) and grooving (100% 4HJ7 / $5280 per mile) and split 4/2 to cover the remaining costs (4PF7/4PS7).~|~21 - Safety~|~6409DB2C2BEC71699D22803F48C0C85B411607C7 102028~|~1~|~3~|~03/SAF~|~Safety funded centerline rumble stripes.~|~21 - Safety~|~7BE054E4036656134BC5B738AFD41260D7CFA933 102028~|~1~|~5~|~05/SAF~|~Medina County Sanitary Engineer Water Work Items~|~21 - Safety~|~EE246A06A93BC257F042EA99AF4F054EFD9B5A07 102028~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~03DDEC0C9849BFF6613449F923355461F2ED9A4A 101774~|~1~|~1~|~01/NHS~|~Slide repair and Culvert replacement on BRO 125 (7.00-7.60).~|~04 - Reconstruction - No Added Capacity~|~44C11B27A2317546DCC4316480FADC3E34E10BE8 114004~|~1~|~1~|~01/NFA/PCEO~|~"01/NFA/PV/PCEO" - 80% Federal (4B77) and 20% Local (4BG7) - resurfacing and related work on CR 22.~|~05 - 4R Maintenance - Resurfacing~|~4273E1676C63FA655715EB393008649FB1D77233 126075~|~1~|~1~|~01/SAF~|~Plan split for flat sheet signs~|~21 - Safety~|~CD47B8A66863A273476524CFAFDF1CEDEC5BEB27 124999~|~1~|~1~|~01/ENH~|~Add wayfinding and safety signage along the Big Walnut Trail in the City of Gahanna.~|~28 - Facilities for Pedestrians & Bicycles~|~9CD2ECC5248CB6B489E6A806C212481A12CFA991 106161~|~1~|~1~|~01/NHS~|~Plan Split~|~05 - 4R Maintenance - Resurfacing~|~63AD10D50C7D22A9549A76205425C1C64F4AFB09 106161~|~1~|~2~|~02/NHS~|~Plans split 2 for 100% Lcl items and paving over fed. funding max.~|~05 - 4R Maintenance - Resurfacing~|~73E2C1D10AD0B101A7F1F2A70DCC6BE8594487BC 108164~|~1~|~1~|~01/ERD/AKRO~|~Reconstruction of deteriorated pavement and sidewalk, upgrade of traffic signals, cycle track and landscaping.~|~04 - Reconstruction - No Added Capacity~|~A55B2F5ACADCD4B97945EDBF17243D5130F1BE5E 116859~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~EC06084CEDF5B203D38BB94B86ADB6E0622EBF7D 93654~|~1~|~2~|~02/SAF~|~Corridor upgrade - replace sidewalk, curb and drainage. Consolidate drives and widen for bike lanes. On south Richland Avenue from Canterbury Drive to Dairy Lane. City items funded 100% local.~|~21 - Safety~|~93ABA682F0F8DE6CD6915CC234EA28B8BAC64702 93654~|~1~|~1~|~01/SAF~|~Corridor upgrade - replace sidewalk, curb and drainage. Consolidate drives and widen for bike lanes. On south Richland Avenue from Canterbury Drive to Dairy Lane. Fund event 1 - 90% Federal Safety/10% State Safety; 2 - 80% Federal/20% Local; 3 - 80% Federal/20% Local; 4 - 100% local over the cap (if needed).~|~21 - Safety~|~B01266230EB6DF3305540E85F0790D2445A0F969 76439~|~1~|~1~|~01/SAF~|~Plan Split for STA SR 800 7.05 to 8.08~|~21 - Safety~|~20FCF61BE596818CF58A6F01DECC5C07A6B66724 96305~|~1~|~1~|~01/NHS~|~80/20 ODOT/Local Worthington Urban Paving NHS~|~05 - 4R Maintenance - Resurfacing~|~EACC556B165C3FE0340502F128E28011C090C1DD 96305~|~1~|~2~|~02/NHS~|~Work on structure 2508958~|~05 - 4R Maintenance - Resurfacing~|~EB47AD49A7DDFFB80DFA37B86C9BDA446B32FB5D 103647~|~1~|~1~|~01/NHS~|~Main Plan Split~|~44 - Other~|~E59C7D5D4FB3979C53A770B534653D218959937D 103647~|~1~|~2~|~02/IMS~|~LUC-475-9.54 to 10.27 and LUC-475-12.82 to 13.34~|~44 - Other~|~ADCDD4C019BCE1C2EDFD147D1A67281FE4020203 126677~|~1~|~1~|~01/STR~|~FAY 753 0055 rehab~|~13 - Bridge Rehabilitation~|~DD73E64F5E93D8F9F988BB28CBCCF120DE10D88F 104112~|~1~|~1~|~01/NFP~|~Construction of noise on West side of Interstate 271 just North of State Route 82 in the City of Macedonia, Summit County, Ohio.~|~44 - Other~|~8B75D16EE3D04EF1B67C178320856444342B5CA5 116770~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~9A6068670A939BBB7C559813EFF6428ED5ECF1AC 126404~|~1~|~1~|~01/S>2~|~Plan split for the items that are Urban Paving eligible; 80/20 split between ODOT and the City. ~|~05 - 4R Maintenance - Resurfacing~|~FCE84212156679EF537EDB3521C2FCB25219C096 126404~|~1~|~2~|~02/S>2~|~Plan Split for the 100% City funded items. ~|~05 - 4R Maintenance - Resurfacing~|~D1473C652374B5C043081A80D3AFBE0355161819 114589~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 5.26. Work includes dig out and replace.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C180262B5B3DEBDB9FF412B747C31E44B71E529A 124693~|~1~|~1~|~01/BRO~|~Single Span box beam super replacement.~|~13 - Bridge Rehabilitation~|~62581C6A750EFD834A2C4AFD0C9A9481EEBEB9FE 96474~|~1~|~1~|~01/BRO~|~BR Eligible. Marion-Williamsport over US 23 (5100925) 100% State~|~13 - Bridge Rehabilitation~|~A77229758CD8D9E3B61320367F09CAFF6B4A06ED 126001~|~1~|~1~|~01/NHS~|~PLAN SPLIT FOR FUNDING~|~05 - 4R Maintenance - Resurfacing~|~59656AECE48407AD56F6FED8B5A3E212D68FC34B 103692~|~1~|~1~|~01/SAE~|~Apply edgeline and centerline pavement markings on various county roads in Clinton County.~|~21 - Safety~|~517EE8A2C77C7226BF7FBD5951E04CB12E6F423B 87137~|~1~|~2~|~02/S<2~|~02/S<2/PV/ This split is for resurfacing work that is inside the Kenton Urban Area and inside the City of Kenton. The City of Kenton is responsible for paying the 20% non-federal match for work covered by this split.~|~05 - 4R Maintenance - Resurfacing~|~25AD79D34BED21DDC705EB1B956523CFE1252552 87137~|~1~|~3~|~03/S<2~|~03/S<2/PV/ This split is for resurfacing work that in outside the City of Kenton but inside the Kenton Urban Area. There are no funds from the City of Kenton in this split. All funds are from the District Preservation Program Budget. Work on SR 309 outside the City of Kenton up to 17.93 is covered by this split.~|~05 - 4R Maintenance - Resurfacing~|~540A672D9BBC7B207A7EDF402B7D9E4440861E42 87137~|~1~|~1~|~01/STR~|~01/STR/PV/ This split is for resurfacing work outside of the Kenton Urban Area. The Kenton Urban Boundary is at 17.93 on SR 309. This split is for work on SR 309 starting at that point.~|~05 - 4R Maintenance - Resurfacing~|~C546AA816C0AAAC4EEA3336DDD85F520D6C6886C 116293~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~ED4AC7FA265AC59D839ECCC9FA678DFE643C57DD 116293~|~1~|~2~|~02/S>2~|~stp 200k~|~05 - 4R Maintenance - Resurfacing~|~20D09690E2739C5A2AD97347E9A37C16DBEF6949 116293~|~1~|~3~|~03/NFA~|~not on fed aid~|~05 - 4R Maintenance - Resurfacing~|~58434CCCF3A7C3DEA0F88BF877E2BC7FAAEC92C5 98340~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - District Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail Upgrade at: 1) Fai US 22 11.96 to 13.16; 2) Fai SR 37 10.40 to 14.19; 3) Lic US 40 00.00 to 05.27; 4) Lic SR 13 13.98 to 17.51; 5) Lic SR 16 07.55 to 14.10;~|~44 - Other~|~90D3572A4649F87AB735960E67238600A4A5E498 98340~|~1~|~2~|~02/STR~|~"02/STR/OT/ " District Preservation Funding 4PF7 (80% Federal) /4PS7 (20% State) - No Cap - Guardrail upgrade at: 1) Per SR 13 13.68 to 17.47 2) Per SR 37 15.05 to 20.17~|~21 - Safety~|~7436A519F5F5C37A6315D5A573D5292132D42904 126060~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~6B5B368FCAC75326835D29D0C6D7C53668C4D196 98208~|~1~|~3~|~03/IMS~|~Lands & Buildings Funds - LBP7 (100% State) - CAP (See CAP Comment) - Restoration of pavement markings on LIC -70 EB (Park 17) and WB (Park 18) Rest Areas and GUE-IR 70. EB & WB Weigh Stations.~|~21 - Safety~|~4F85F28C7D7B227767874D969E41E1A6ED978E67 98208~|~1~|~1~|~01/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Epoxy Pavement Markings on Interstate Routes in District 5: GUE-70-(16.30 to 16.60); LIC-70-(9.01 to 9.46); LIC-70-(16.73 to 17.30);~|~21 - Safety~|~6402FC1FFB10B2FE657BA5490777814D1F3D89E8 98208~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Epoxy Pavement Markings on NHS routes in District 5: FAI-33-(8.77 to 8.97), FAI-33-(12.53 to 13.00), FAI-33-(14.86 to 15.25), FAI-33-(20.43 to 20.75), LIC-16-(23.61 to 23.86); MUS-16-(0.98 to 1.48), NUS-16-(5.68 to 6.35), MUS-16-(9.99 to 10.54)~|~21 - Safety~|~80B52C55B144BE49A461F801CE4B91213E659052 114644~|~1~|~1~|~01/S<2~|~Resurfacing-Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~3A4777765CFC1890CF9D62B973C3E25CD53AE6DC 103121~|~1~|~1~|~01/NFP~|~Maintenance (4CP7): Replace Signal UPS Batteries~|~21 - Safety~|~032A8A042323A8CE829FD9304AE591327E4A9E0E 120117~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~3E7837155C5E22E4D836AF26AC58CDDB4C20FD6B 122092~|~1~|~1~|~01/IMS~|~Plan Split for work associated with installation of VSL signage and appurtenances.~|~21 - Safety~|~8C414A15797716A866F3EF402E2BD1703E9721B8 93347~|~1~|~2~|~02/BRF~|~BRO 763 0.63 (SFN 0803847). Bridge Eligible for federal money due to G.A.~|~10 - Bridge Replacement~|~23C4FC25F5EA3A9A438B8279A49A4AFDC182D33C 93347~|~1~|~3~|~03/NFA~|~BRO 763 (0.92-1.12)~|~05 - 4R Maintenance - Resurfacing~|~5518667797814819C794EBCC635FDF273C90A325 93347~|~1~|~1~|~01/NFA~|~BRO SR763 Brdg Replace/Realign BRO SR 763 0.92 - 1.12 Brdg Replace/RealignOn SR763, 1.01 miles north of SR41, it is proposed to replace the bridge and realign the roadway & add a retaining wall. 100% state 01/NFA/BR/State~|~10 - Bridge Replacement~|~DE7B73260BA4A2CAD643A8CC93A0BF4B800B76EE 112472~|~1~|~1~|~01/MPO~|~Split for MPO-funded paving work~|~05 - 4R Maintenance - Resurfacing~|~37E319F75533F0ECED30F5683D94EC0035A2925F 96517~|~1~|~1~|~01/IMS~|~Resurface SUM IR 77 from 1.40 to 4.00~|~~|~71BF885AF21ABAA7860B88FA90BA84E1BD6B23EB 96517~|~1~|~2~|~02/IMS~|~Minor bridge work to SFN 7702132 & SFN 7702167 SUM IR 77 1.57 L&R over Greensburg Road, SFN 7702221 SUM IR 77 2.84 under Wise Road, SFN 7702256 SUM IR 77 3.77 under Graybill Road.~|~~|~8EA3F22E433196ED2E21759DAA5E0FECB0BCFD95 113556~|~1~|~1~|~01/BRF~|~100% Federal Participation on the bridge replacement SFN 1860015 using OBPP funds and TRC.~|~10 - Bridge Replacement~|~3FA5D94C8F4CB2A0BC82551FA40E73AE5AD83D15 119666~|~1~|~1~|~01/NFP~|~Culvert Replacement.~|~04 - Reconstruction - No Added Capacity~|~702A24A5A5496561EDC6B7BC5E4073373ECF3AA4 104270~|~1~|~1~|~01/NFP~|~Maintenance contract of traffic signals and highway lighting.~|~44 - Other~|~54E637E451C0650D744506775D24ACC86557D8C3 93750~|~1~|~1~|~01/SAE~|~100% federal safety funds from Central Office Safety Program. SAC 4HJ7.~|~21 - Safety~|~F6BEFB64A1A0D446CE4DF3EDB02BC800C15742FE 120398~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A20E8E6ECCA752CEBBCA310C951D75C06467BA46 114352~|~1~|~1~|~01/SAF~|~Safety improvements on CR 335 (Spangler Road) from Restoration Park Drive to Main Street and on CR 303 (Medway-New Carlisle Road) from Main Street to US 40.~|~21 - Safety~|~A0638E47481CBD3EC27AFFF6AA567CB6B09281C3 114352~|~1~|~2~|~02/CMQ~|~Add northbound right-turn lane at Union Road and northbound left-turn lane at Lower Valley Pike~|~04 - Reconstruction - No Added Capacity~|~A11F219CE32EAFDA155A66A9176464B8AA9FF03A 119682~|~1~|~1~|~01/MPO~|~Resurfacing of W. Main Street from Orange Street to Church Street.~|~05 - 4R Maintenance - Resurfacing~|~7B412CCEE6837789FE368A7BD01720576D9210A0 121130~|~1~|~1~|~01/STR~|~Resurfacing US 62~|~05 - 4R Maintenance - Resurfacing~|~C17752D91386F557BBF47CBB83F4984B474DBF44 126062~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~F8E5B4EF01B0427DF62B444FEB000388BE88CA8E 87090~|~1~|~5~|~05/STR~|~Small culvert replacements for BUT-73-0259, and 0263, and BUT-177-0402, 0403, 0409, 0409A, 0486, 0561, 0570, 0966, and 0974.~|~44 - Other~|~62F883071CCDB62D2D96A6E7266AC7E39DDA51D5 87090~|~1~|~2~|~02/S>2~|~Pavement work on large urban route~|~05 - 4R Maintenance - Resurfacing~|~6657E92571A175FCE12344CBA8C2085E30F8286C 87090~|~1~|~3~|~03/S<2~|~Pavement work on small urban route.~|~05 - 4R Maintenance - Resurfacing~|~04436C83311BD2A9960138E5944EDC7355841053 87090~|~1~|~6~|~06/S>2~|~Culvert work on large urban route.~|~44 - Other~|~B8D52363C8375ED2B172A7E0A6FEAE14925F84F3 87090~|~1~|~1~|~01/STR~|~Resurfacing a portions of SR 73 and SR 177 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items. The limits are SR 73: 1.55-4.07 and SR 177: 3.71-10.15~|~05 - 4R Maintenance - Resurfacing~|~DDE00B7B475166143EE4EDBDD448FD865CFC9D31 87090~|~1~|~4~|~04/NHS~|~This plan split is for the NHS portion of SR 73 between SLM 1.47-1.55 or 0.08 miles of roadway. Resurfacing a portion of SR 73 Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~DF1FFE8B64357D126216C27C75099501C0470163 87090~|~1~|~7~|~07/S>2~|~Water line work to by covered 100% by Southwest Regional Water District.~|~43 - Utilities~|~38B1D6B73553E677222BEA6FB511D007139F9C00 96476~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2019. Various routes and sections in D10. Non federal aid project funded 100% state.~|~21 - Safety~|~15FBD05027DBA2C528A82B35F204029DB7D702FD 86797~|~1~|~1~|~01/SAF~|~Safety - Add two way left turn lane from end of left turn lane at Crest to Cranbrook, two way left turn lane will become left turn lane at Cranbrook.~|~21 - Safety~|~2DFF4DD5E15B00080895979BBB80191DFA27B1DC 86797~|~2~|~2~|~02/SAF~|~Greater Cincinnati Water Work portion of Safety Project~|~43 - Utilities~|~F29666AB72EB517838F762BDC989DC138F3C0C79 96233~|~1~|~3~|~03/S>2~|~STP>2 Urban. SLM 15.99-16.84 Columbus~|~05 - 4R Maintenance - Resurfacing~|~060D25E90EAC72998A7B7E84CB8D54A66FF7CDEA 96233~|~1~|~2~|~02/NHS~|~NHS Urban. SLM 7.60-10.46; 12.36-15.99; 16.84-17.57 Columbus~|~05 - 4R Maintenance - Resurfacing~|~4F223592969A2CCCFD8F78AACF92DF8EBF068B03 96233~|~1~|~1~|~01/NHS~|~NHS General. SLM 7.04 to 7.60~|~05 - 4R Maintenance - Resurfacing~|~BC87C9E88C79B79719BBA731C884F504802ADD38 85059~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~7FAFED7AD147A7668EFD53DEA30BDF77F4FEE6A0 114801~|~1~|~1~|~01/SAE~|~Multilane roundabout(s) project on FRA-CR125 (Frank Road) at Brown Road/Hardy Parkway Local sponsor - Franklin County Engineer~|~21 - Safety~|~CE4CB4093C580496D8B7F1A6ABF5671F24FC82BB 113810~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~49C63FB024500F6B09C566461AA84D9BF80F4434 113810~|~1~|~4~|~04/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~2AAFA8C1EA3D467A832D315DDD64DFEA503851D7 113810~|~1~|~2~|~02/STR~|~Minor bridge work 10' to 20' and culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~1D40EAB97B2AF18F78DFDA27BB587A604F40204D 113810~|~1~|~3~|~03/STR~|~Bridge replacement 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~E0B5F3A18B0F93C6AA2F60D95B80FA2E9FFF36D7 108742~|~1~|~3~|~03/SAF~|~Widening of Western Reserve Road to include a two way left turn lane and right turn lanes at three locations.~|~~|~9C6512FA2D264D0BCCF82875D480B898CC4A31FA 108742~|~1~|~1~|~01/CMQ~|~Widening of Western Reserve Road between State Route 7 and South Avenue.~|~~|~94F4CCE4A97243C4B1FE96142BCFFC8C6598E052 108742~|~1~|~2~|~02/MPO~|~Widening of Western Reserve Rd from Market St to South Ave.~|~~|~D6F61F03DA30A17CEBB0E74E2DB83C2DF73C63C8 111617~|~1~|~1~|~01/NFP~|~Guardrail replacements and upgrades on various routes throughout District 4.~|~21 - Safety~|~DD54DDE0A42B43E3AC45EAD29B28AD942BEAD316 117468~|~1~|~1~|~01/S>2/SUCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~8B1F0E7AEA1509966AD41733A1E602DAD0B5C483 107654~|~1~|~1~|~01/IMS~|~Fix damaged parapet railing from truck accident on 02/06/18.~|~13 - Bridge Rehabilitation~|~3E260B6510A93D4DA8875E8350A8E96E9D39DFAB 126749~|~1~|~1~|~01/NFA/CROO~|~Replacement of the Old School Drive Bridge (SFN 6433637) in Village of Crooksville.~|~10 - Bridge Replacement~|~D6455AFA902088307EBC20B70CE52ED59AA0A5CA 97461~|~1~|~1~|~01/NFP~|~This the district's annual long line pavement marking project.~|~21 - Safety~|~B22DA0DA3099542BFAD0FA1A8D2CBFD6E9FF6CBE 107127~|~1~|~1~|~01/S>2~|~Urban Paving - City of Loveland - Oakland Dr. to Warren Co.~|~~|~89859DE0495F88949A8CAD0146F3FDB37D7E088D 107127~|~1~|~2~|~02/S>2/LOV~|~Items to be covered 100% by the City of Loveland~|~~|~28FB4BB1D771A9C668FD632D5373EC0042896ED1 110161~|~1~|~1~|~01/NHS~|~Culvert repair and replacement project. WAS 7 12.81 (1880523). NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~2236DCBAB5F0FC724B463DA1F528BC85B252FF8B 110161~|~1~|~2~|~02/IMS~|~Culvert repair and replacement project. WAS 77 0.61 (1804979), WAS 77 4.11 (1805012). Interstate route funded 90 federal/10 state.~|~04 - Reconstruction - No Added Capacity~|~43F6B22B260FBE4C99C90A9C15EA68C1A9ED2642 110161~|~1~|~3~|~03/STR~|~Culvert repair and replacement project. WAS 339 5.67 (1887482), WAS 339 9.77 (1885824), WAS 339 17.52 (1809793). Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~AEE0530ABB67E0849AC43FAEC7EA6756085F4E98 110161~|~1~|~4~|~04/NFA~|~Culvert repair and replacement project. WAS 260 8.25 (1810378). Not on the federal aid system funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~EBDB42F076F027767542612576296F85AD386D9F 91713~|~1~|~1~|~01/S<2~|~Resurfacing project using an asphalt overlay treatment. GAL 160 0.00-3.06. Urban other federal aid funded Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~D48BBAEF93CBBB10CE899B9F79969A1C5AED93C7 101706~|~1~|~1~|~01/NFA~|~Rehabilitation of the Foraker Covered Bridge on MOE CR 40 0.99, SFN 5633230. Bridge has developed a sag which affects the structural stability of the truss bridge. Funded 80 federal/20 local.~|~17 - Construction Engineering~|~111B1AB027CDA8DB28B501008CFA7B0C5F017BA8 83936~|~1~|~1~|~01/S<2~|~Resurface the existing roadway along with other roadway related items on State Route 366 in Russells Point from the junction of State Route 235 (SLM 2.98) to the junction of Township Road 94 (SLM 6.03).~|~05 - 4R Maintenance - Resurfacing~|~225B9BFABF08E57C77549F32D01ECB27535CC8BF 122167~|~1~|~1~|~01/ENH~|~Construct a 10' wide asphalt shared use path along the south side of E. Ohio St. and west side of Kingston Pike.~|~28 - Facilities for Pedestrians & Bicycles~|~8810A0CCB928A6F226A920534EA596DA8CBCAEF6 93575~|~1~|~1~|~01/SAE/NEWA~|~"01/SAE/OT/NEWA" City of Newark SRTS Project - Bridge and connecting path at Legend/Wilson Elementay School. Total project funding cap utilizing SRTS 4SC7 of $500,000 minus PE/ROW Encumbrances of $125,996.88 equals $374,003.12 available for construction CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~0C2E95DCB048268CB83AEEA6A81288D16175C1D6 102745~|~1~|~4~|~04/NHS~|~Minor bridge work > 20' span.~|~47 - Bridge Preventive Maintenance~|~79BEF617712EDED7BF4BC30ABFFC549F86D80CD5 102745~|~1~|~5~|~05/NHS~|~Minor bridge rehab > 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~419F6A8AF85CBCE58C477065F9ED98EC0825FD6B 102745~|~1~|~3~|~03/ENH/STOW~|~Installing/upgrading sidewalks and ADA curb ramps and other pedestrian facilities.~|~28 - Facilities for Pedestrians & Bicycles~|~5B5BD94D8A26C8182C6747FEFE304680191BF11D 102745~|~1~|~2~|~02/CMQ/STOW~|~Signal replacements/upgrades.~|~04 - Reconstruction - No Added Capacity~|~2DEFCC6528549120D442FD632BCB1663BE0163ED 102745~|~1~|~1~|~01/MPO/STOW~|~Pavement reconstruction.~|~04 - Reconstruction - No Added Capacity~|~FC9A5A2A93DCB050550782EB13308787FBABACB5 102745~|~1~|~6~|~06/NHS/STOW~|~Lighting improvements.~|~04 - Reconstruction - No Added Capacity~|~1FE38CC47C557E02E717A62AF83F1D6B3B4FB4A4 114547~|~1~|~1~|~01/NHS~|~Mine/slide repair by ditch and culvert cleanout~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E75742E60682B12DE027F1DD8D25435773DADA7F 93548~|~1~|~1~|~01/IMS~|~Construct a Type II noise barrier along the Southbound side of Interstate 75 between Cincinnati/Miami Chapel Road and Stewart Street. MOT 75 11.09 to 11.22.~|~44 - Other~|~5A2F0F10DC246A828648512A262AE2C06B24E177 93548~|~1~|~2~|~02/IMS~|~Repair of noise wall at CLA IR 70 0.00, MOT IR 70 17.90, MOT IR 75 16.70, and MOT IR 675 3.00.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BA78C724EFCD131265DC4AE614B00DD2D1F34892 81102~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 724 0231 (SFN 6105106) and 0122 (SFN 6105041). Funded 80 federal/20 state.~|~10 - Bridge Replacement~|~283AE1B8CBE99BFE5A4AB6FCCBB2E2BCD026FFBD 81102~|~1~|~2~|~02/BRF~|~Bridge replacement project. NOB 724 0264 (SFN 6105130). BR eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~4A93D23A96E7C6E19A5277E034A9A9A05194F441 81102~|~1~|~3~|~03/BRF~|~Bridge deck replacement project. NOB 724 0044 (SFN 6104983). BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~AC41B31AD0B93E21FBC52A2C15CEC7CB765E6488 123991~|~1~|~1~|~01/SAF~|~Guardrail replacement project on HOC CR 17 0.00-4.91 and HOC CR 82 0.00-3.374.~|~21 - Safety~|~9B57A5AFABC1613FEC37EA1F3B5780550C5C3547 92543~|~1~|~3~|~03/NHS/tall~|~100% City of Tallmadge items.~|~05 - 4R Maintenance - Resurfacing~|~266AC4B94415528960C7CB75AEE57AB48F36FA96 92543~|~1~|~1~|~01/NFP~|~Spot paving in Portage, Stark and Summit Counties~|~44 - Other~|~7AC3CCA6C3293210D0818B27CCC52DC12FA97D56 92543~|~1~|~2~|~02/NHS/Tall~|~Resurfacing of State Route 91 from slm 6.02 to slm 7.05, in the City of Tallmadge, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~8E887741C4FC3863073840804A4D32928B76AEDD 114683~|~1~|~1~|~01/S<2~|~Resurfacing-Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~B5F2456D51299E7B8AF91065226942ED60714324 96999~|~1~|~1~|~01/NHS~|~Building Demolition~|~44 - Other~|~141DF3325AB0138E81B82E0692934013F8571EB9 102753~|~1~|~1~|~01/IMS~|~This plan split is for Bridge rehab on the Interstate Route.~|~13 - Bridge Rehabilitation~|~09DB1F80A773F5408E5AAC56BDA9178C6B0336B2 93038~|~1~|~2~|~02/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1)Mus-SR 146- 25.78 to 33.76~|~05 - 4R Maintenance - Resurfacing~|~543BC03B40694FE443E193ADA77414D8D8D91E9F 93038~|~1~|~1~|~01/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Resurfacing with related work on: 1) Gue-SR 313-00.00 to 01.24; 2) Gue-SR 285-09.47 to 13.46; 3) Gue-SR 340-0.00 to 00.86; 4) Gue-SR 672-00.00 to 02.74; 5)Mus-SR 313-00.00 to 07.13; 6)Mus-SR 340- 00.00 to 3.64~|~05 - 4R Maintenance - Resurfacing~|~4D8132B809B83ED19F540ACA5DEB37FE2F18D7D9 88328~|~1~|~1~|~01/ENH~|~Interchange Gateway which will add city logos on an undulating concrete wall that "wave" in both horizontal and vertical directions to represent the strong influence of water on the community on Interstate 75 at Exit 47 MOT IR 75 SLM 6.43 to 6.96.~|~31 - Landscaping & Other Scenic Beautification~|~E35C6E2D08DA53E8CC9D0E88956F913FE0DA1B03 106375~|~1~|~1~|~01/STR~|~Remove and replace culverts on rural routes in Montgomery County.~|~~|~3BD2BB4F64526A0049D7C22EE0D4E2799F61D917 113171~|~1~|~1~|~01/MPO~|~Resurfacing of Tallmadge Rd from SR 44 to SR 14.~|~~|~C0FD5138A99ADE08237890D8C4B7C6BC3F881190 114867~|~1~|~3~|~03/NFP~|~ODNR project to resurface roads R-5, R-4, R-2, R-3, F-3, F-2, F-4 in Strouds Run State Park and roads in Burr Oak State Park.~|~05 - 4R Maintenance - Resurfacing~|~04EB96DD58F058CA38EEA526CD10E55340BCEACF 114867~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. HOC 328 5.92-10.517. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~C9B5251DC1FE4DA92E1D8D83751BD91FCEFD4CF5 114867~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment on ATH 13 3.15-3.710, ATH 682 6.40-7.884 and HOC 328 10.517-11.043, 11.103-11.23. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~AE18DBECA3FBA122DC35E53D2A7C634B140B5792 114867~|~1~|~4~|~04/S5K~|~Resurfacing project using an asphalt overlay treatment in the City of Logan. Urban Paving. HOC 328 11.043-11.103. Funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~A557047BB8BEBBC5CBBFA573E48B299ECABDBEE5 100743~|~1~|~1~|~01/NFP~|~RPM's on various routes~|~44 - Other~|~9A7F57758424379B62129BE7188210C20F4B3B63 120778~|~1~|~1~|~01/STR~|~STP Rural bridge repairs~|~47 - Bridge Preventive Maintenance~|~6C64B270B1C4704EB66A7055A76C37B28FE5E95A 120778~|~1~|~2~|~02/NHS~|~NHS bridge repairs~|~47 - Bridge Preventive Maintenance~|~B4E20C1761E1FCB8708E519DF101B2F435C05CD1 120778~|~1~|~3~|~03/NHS~|~NHS culvert repair~|~04 - Reconstruction - No Added Capacity~|~E9DF3B7601EF37E959BBCCF4A23BE5499B06C6DE 117346~|~1~|~1~|~01/NFA~|~Bridge Replacement~|~10 - Bridge Replacement~|~2CE8E4479FE157C5C93E888DC9ED53B53090C4B5 80501~|~1~|~1~|~01/STR~|~The split is for work funded with federal rural STP funds with a 20% state match. All funds are from the District Preservation Program budget. There are no local funds in this split. The entire project uses this split.~|~05 - 4R Maintenance - Resurfacing~|~6CF9BD94C4FE835F726971797326F8FE3CA08DD2 123690~|~1~|~1~|~01/MPO/STCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D6FCA49DA19E441B272ED24C5C07A2FC4B3D1A94 89005~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill~|~44 - Other~|~28FCAF0F20B485ED673D90E5CEE3177D6CC07954 113043~|~1~|~1~|~01/STR~|~All work in this split.~|~05 - 4R Maintenance - Resurfacing~|~D9D901E7BBCDA98FAC550A8C04A3B4BE039FE73F 118620~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/PV - 90% 4PF7, 10% 4PS7~|~05 - 4R Maintenance - Resurfacing~|~233803F1E8CFD3021E13F0A582658B525149008A 105264~|~1~|~1~|~01/S<2~|~Smooth seal on small urban route:MER US 127 SLM 10.62 to 12.62MER US 127 SLM 14.68 to 14.93~|~05 - 4R Maintenance - Resurfacing~|~32147550C3360CF7744F0BC5D336BD677E71D527 105264~|~1~|~2~|~02/STR~|~Smooth seal on rural route:MER US 127 SLM 8.83 to 10.62MER US 127 SLM 14.93 to 21.11~|~05 - 4R Maintenance - Resurfacing~|~D821174B9A63FC76153F7D3864AC89033A463CD9 100958~|~1~|~1~|~01/NHS~|~STA US 30 from 16.46 to 18.35 STA SR 43 from 9.03 to 10.74STA SR 172 from 16.58 to 17.61~|~05 - 4R Maintenance - Resurfacing~|~01175A6C9436BA6189E5EC581A3C43B6A58481DF 100559~|~1~|~1~|~01/S>2~|~Plan Split for sections within the large urbanized areas. These sections are WAR-74 between SLM 7.08 - 8.07 and SLM 13.78 - 13.82~|~99 - State Preventative Maintenance~|~BBA90398B88DBB3B9ABA1EFF0A8E23BA555376EC 100559~|~1~|~2~|~02/STR~|~Plan Split for the rural portions of SR 741. These limits are SLM 8.07 - 10.43 and SLM 11.02 - 13.78~|~99 - State Preventative Maintenance~|~C1684F2EAB7A2BAB191403A05BCC83EFEEE2CF37 100559~|~1~|~3~|~03/S<2~|~Plan Split for the section of WAR-71 considered to be in the Middletown urbanized Area. These limits are SLM 10.43 - 11.02~|~99 - State Preventative Maintenance~|~584EC2BFA0B4F3DA59B43E1A02FC12D191633B44 117481~|~1~|~1~|~01/NFP~|~ODNR project for gravel road resurfacing and culvert maintenance at ATH Wallace O'Dowd WLA.~|~05 - 4R Maintenance - Resurfacing~|~E3A78D0B2F726AAD1F0D41197845768A31DB6231 100564~|~1~|~1~|~01/NHS~|~Microsurfacing JEF-22 from the HAS Co. Line to SLM 3.86.~|~05 - 4R Maintenance - Resurfacing~|~E2002B2C7889FB2F4F5D7098277EE43E4BFAB0C8 95794~|~1~|~1~|~01/STR~|~from SLM 0.00 to SLM 5.08~|~05 - 4R Maintenance - Resurfacing~|~7ECF0E3EAFC49348A60321BEFAF58E0283AA0E21 93112~|~1~|~4~|~04/NHS~|~Bridge workSFN:4703421 LOR-58-22.88~|~47 - Bridge Preventive Maintenance~|~51F36EE4059E6F1BE98849D2F1C7789E0EB716D7 93112~|~1~|~2~|~02/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~7AE11F7D87070905E19BAF92202BAD6C98C8DB6A 93112~|~1~|~3~|~03/NHS~|~Urban paving - 80/20 - District Allocation/City of Amherst~|~05 - 4R Maintenance - Resurfacing~|~886685FC5BD290A56E957DA6D03C6E8940891BB1 93112~|~1~|~1~|~01/NHS~|~100% City of Amherst~|~05 - 4R Maintenance - Resurfacing~|~8EC7C13FE8739CBAFFFF6A05CCF2A1DC80CC97AC 124337~|~1~|~1~|~01/NHS~|~Noise wall construction~|~20 - Environmental Only~|~5EEAE1A5518D73A8DFFB8CA92ACC24048219EFC5 112237~|~1~|~1~|~01/NFA~|~Tree cutting project.~|~44 - Other~|~FBDC2935DA0B5C4B747628F31E83C7847F655C12 102035~|~1~|~1~|~01/NHS~|~signal upgrade at SAN-6/SAN-53 intersection.~|~21 - Safety~|~B0C54335243D23834295C54A4078A021DCEF847D 98930~|~1~|~1~|~01/S>2~|~Sylvania Ave~|~04 - Reconstruction - No Added Capacity~|~DCF81B41C324A1ED59AB56094B0AE81E842764C7 94372~|~1~|~2~|~02/STR~|~STP Rural funding for PIC-104 spot paving~|~05 - 4R Maintenance - Resurfacing~|~6CF5F92EEB89B3ED18C9A6864406A0219859E459 94372~|~1~|~1~|~01/IMS~|~IM funding for spot paving on interstateFRA-70, FRA-71, FRA-270, FRA-670~|~05 - 4R Maintenance - Resurfacing~|~9135506DCE8DFC403DF3DB101BDE07333B7CABE6 116995~|~1~|~1~|~01/MPO~|~Full depth reconstruction of Arlington Ave from Detroit Ave to Spencer St.~|~04 - Reconstruction - No Added Capacity~|~B55ABD82C9DF5B928C27497DEC762D600A260067 114514~|~1~|~1~|~01/STR~|~Resurfacing on the rural segments of US 42 in the project~|~05 - 4R Maintenance - Resurfacing~|~2D270AFA95E99EE3CC38F788B5267BD7554F730E 114514~|~1~|~2~|~02/S>2~|~Resurfacing on the large urban portions of the project~|~05 - 4R Maintenance - Resurfacing~|~DDC8EB494B69B1652578A27DCCC4879773EA94B7 114514~|~1~|~3~|~03/NHS~|~Resurfacing on the NHS portion of the project.~|~05 - 4R Maintenance - Resurfacing~|~9A96CC0C3A4A44D2AB801BB66113A03A39C0FA99 99630~|~1~|~1~|~01/S>2~|~Install sidewalks and lights on bridge approaches.~|~44 - Other~|~8A193F8C953A0B01CA334B43C60DE9BC7BDAE204 112136~|~1~|~1~|~01/S<2~|~Meeker Road Bridge Replacement~|~10 - Bridge Replacement~|~7B747CA51DB3FABD21AC692179156897B9A77E0A 102542~|~1~|~1~|~01/CMQ~|~Signal upgrade at 17 locations throughout the City of Youngstown.~|~~|~6D7B1B934ABF07C83D98E89CB5F5256883E1E8E2 102921~|~1~|~2~|~02/S5K~|~Plan split for resurfacing SR-412 from SLM 0.29 - 0.805~|~05 - 4R Maintenance - Resurfacing~|~D1B923FB201EE38A70F7F9C404DE87218FEE3FF0 102921~|~1~|~1~|~01/STR~|~Plan split for resurfacing SR-600 & SR-412 from SLM 0.805 to 5.540~|~05 - 4R Maintenance - Resurfacing~|~0BB3B63C41A1CCAD5FA75957BA4FEF5747B0F361 91242~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to add turn lane at LUC CR91 3-3.01~|~21 - Safety~|~4D3BAF590EE2C09CF72D196EA60690344EE43706 92726~|~1~|~1~|~01/MPO~|~Resurfacing CR 681 1.26 - 1.74~|~05 - 4R Maintenance - Resurfacing~|~D8DA98583274101062F020D59A5214A98CCC2754 120876~|~1~|~1~|~01/NHS~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~E181BA1428C0F12029017F7074A06CFE17A063AF 104447~|~1~|~1~|~01/S<2~|~100% State funded.~|~21 - Safety~|~2C9E1D207E1226984B132DBCF03EBA531D014C03 92077~|~1~|~1~|~01/IMS~|~8703698 WOO IR75 12.94 Intersect: Us 6 8703728 WOO IR75 12.94 Intersect: Us 6~|~~|~C92A892DC888151F08035DF910FEE9709C7A2053 97758~|~1~|~1~|~01/NFP~|~Construct new Fayette County Garage~|~17 - Construction Engineering~|~3188A3D561758C44CE084ED58A130C83F7E9FBE6 94014~|~1~|~1~|~01/SAF~|~100% federal $'s up to cap amount to construct sidewalks and speed tables near Binns & Burroughs schools~|~21 - Safety~|~DFE438CD2E5CBD0217F4F8BFD0D1225EB13BA9B4 108488~|~1~|~1~|~01/IMS~|~WZTS Plans split~|~17 - Construction Engineering~|~52F47E25E5F4E1C3E9CB1AB6E432A6CB1AC417B8 93847~|~1~|~1~|~01/STR~|~Bridge painting project. VIN 677 3.47, SFN 8203393. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~744195769509E12380E914E99D04B5C9EDA7CCA8 99777~|~1~|~1~|~01/IMS~|~Stream stabilization along Northbound I-71 beginning at the Red Bank Road intercahnge and drainage improvements at the Northbound Exit ramp to Stewart Road.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~087967CBDEC4D5302DBE51151E8F4E980D599817 100630~|~1~|~1~|~01/STR~|~Resurfacing US 36 from SLM 3.85 to 13.86~|~05 - 4R Maintenance - Resurfacing~|~2A86846108244E0AE2F5B72E02E84E04A692DEE3 100630~|~1~|~2~|~02/S<2~|~Resurfacing US 36 from SLM 13.86 to 15.90~|~05 - 4R Maintenance - Resurfacing~|~80D9324CB79532394E5BC3AE3B3FEA903CBEE807 100630~|~1~|~3~|~03/NHS~|~Resurfacing US 36 from SLM 15.90 to US 250 (SLM 17.63)~|~05 - 4R Maintenance - Resurfacing~|~BF6BCC65FF21AD1790B0681DB206ACACB2C3F4CC 121284~|~1~|~1~|~01/STR~|~All Work is within this split~|~47 - Bridge Preventive Maintenance~|~6B65492F3A46E9B9ED74CECDE901137C1898D916 122742~|~1~|~1~|~01/NHS~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~E52AB63FBDEAD78D353C58690D35EEDF5680897C 122742~|~1~|~2~|~02/NHS~|~Plan Split for Urban Paving - Need to identify UP vs STBG limits.~|~~|~3DFC64DF606D61CC6E2D2CB4CAA4CB589B6A670F 110783~|~1~|~1~|~01/SAF~|~Infrastructure improvements will include the upgrade of three intersection crosswalks with hi-visibility markings, one proposed crosswalk with hi-visibility markings and rectangular rapid flashing beacon (RRFB) and sidewalk connection.~|~21 - Safety~|~45D3E3F44E8A243ECC5AE649CE7E0D5956D7C503 107781~|~1~|~1~|~01/STR~|~Landslide repair project. HOC 56 11.00-11.08. 100% Federal ER funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3C9FE42A71F8AB801D173860A0BED331D73C6AD2 97761~|~1~|~1~|~01/BRF~|~Replacement of deficient bridge on MRG-CR75-0W4.41 (SFN 5838673) as part of the Governor's Ohio Bridge Partnership Program.~|~10 - Bridge Replacement~|~3CEAD27CF8C60D0E103252285D36A31A992484DF 126424~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with RepairsMED-42-19.153 to 19.573Fine Graded Polymer Asphalt Concrete OverlayMED-42-18.620 to 19.153~|~05 - 4R Maintenance - Resurfacing~|~3A05C1AC68E7A449E8ECFB2ACDC62E16D20F0047 95301~|~1~|~1~|~01/ENH~|~This project consists of constructing a bike path from the intersection of Frederick Pike (CR 165) and Northcutt Place to the Stillwater River Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~A94ECCE7BB611007B7AF89C48EEEDDECB93890E3 97463~|~1~|~1~|~01/NFP~|~This is the district's annual highway and sign lighting maintenance project using 4CP7 SAC code~|~21 - Safety~|~80EF5ECB32FC494FD88E0CE3D3056BEC6C4C65D5 95305~|~1~|~1~|~01/ENH~|~This project consists of the installation of bike lanes on Jefferson Street (CR 628) and on Patterson Blvd. (CR 539).~|~28 - Facilities for Pedestrians & Bicycles~|~D49CF9527C23A2DDAB10978877EF90575F81FA84 118990~|~1~|~1~|~01/STR/MCEO~|~Replacement of MUS CR 7 0.09 (SFN 6036023)~|~10 - Bridge Replacement~|~021E5671EF4DD455B94C59E539F6EEB144C85A4D 88351~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% funds.~|~21 - Safety~|~A30BAEB5648AC919C9EE870162DC70943F11AD99 107676~|~1~|~3~|~03/STR~|~Centerline rumble stripes on SR 309 in Allen County, SR 235 in Hardin County and SR 309 in Hardin County. On the rural STP system~|~21 - Safety~|~ABA71F27116908132C2094AEC1218ACBDE62DD96 107676~|~1~|~4~|~04/S<2~|~Centerline rumble stripes on SR 309 in Allen County and SR 309 in Hardin County. Work in Urban Areas but outside of municipalities ~|~21 - Safety~|~53F58BB819E1B059375601C42D4255D9B5FCE72E 107676~|~1~|~1~|~01/STR~|~Resurfacing on US 224 in Hancock County from the Findlay Urban Area Boundary at CR 248 at SLM 19.941 to the Seneca County line at SLM 26.036. Funded using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~584682E250F5F3E03A417A0A6289A513DE6BF2ED 107676~|~1~|~2~|~02/S<2~|~Resurfacing on US 224 in Hancock County from the TR 212 at SLM 17.421 to the Findlay Urban Area Boundary at CR 248 at SLM 19.941. Funded using district preservation program funds (80% 4PF7 and 20% 4PS7). Although the work is inside of the Findlay Urban Area it is outside of the City of Findlay. No local funds are being used.~|~05 - 4R Maintenance - Resurfacing~|~688D0AD0744096444E59730028AB668D5C19BEE8 84650~|~1~|~1~|~01/NHS~|~ROS US35 10.22 - 14.47 resurfacing projectOn US35, beginning 1.15 miles west (SLM 10.22) of CR101 Westfall Overpass, heading south east for 4.25 miles and terminating 0.08 mile south east (SLM 14.47) of ramp 71040 to CR550, it is proprosed to resurface the 4 lane highway.Pave thru brdgs:7101643 ROS US35 13.33 Intersect: Stream7101678 ROS US35 13.4 Intersect: Co Rd 1027101694 ROS US35 13.53 Intersect: W Fork Of Biers Run7101708 ROS US35 13.75 Intersect: E Fork Of Biers Run80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~CA29B20BA758AAFCEBF8E2163057F4CFB19160C4 109699~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~05 - 4R Maintenance - Resurfacing~|~A69D74FEDFC3CE456C27FA2606115192A12A453D 113801~|~1~|~1~|~01/BRF~|~Bridge replacement - fed/state exchange.~|~10 - Bridge Replacement~|~A221272D8A9C95C43EA350A80550C1AA15760590 106700~|~1~|~1~|~01/BRF~|~Work to replace the bridge. Federal funds from the CEAO budget with a non-federal match provided by Paulding County.~|~10 - Bridge Replacement~|~DF76AD143AC0873A5B806239E0C7BAF91617321E 91273~|~1~|~1~|~01/STR~|~PIK SR 335 16.95 OH11-02 Emergency Slide Repair 01/STR/OT/State~|~44 - Other~|~F6884D6451EF270C9BF1CD4E7E6FF6D46DC3F7F9 96408~|~1~|~1~|~01/NFA~|~Upgrade crosswalks, including curb ramps, pavement markings, traffic control signage and flashing beacons and provide new sidewalks at various locations near Libert, Wilcox and Lear North Elementary Schools in the North Ridgeville SD.~|~28 - Facilities for Pedestrians & Bicycles~|~B16EAEF29F6B4996E41EA4422DA73445DB2B5E2F 82378~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split using TRAC funds for all work.~|~08 - Bridge - New Construction~|~82FDD750EF61AF18B48C218326B6A1B126BE4C6F 107870~|~1~|~1~|~01/SAF~|~District Wide Lighting Maintenance Contract - D8~|~21 - Safety~|~03C8A31B8AE4539C5F6C3E587F904FC3BD5E94DA 89485~|~1~|~1~|~01/SAE~|~Pavement markings and upgrade existing markings at various locations in Logan County.~|~21 - Safety~|~D4D9CA4A8D35BFB16182B535051DCF7B2A1A09B4 94658~|~1~|~1~|~01/BRO/GCEO~|~"01/BRO/BR/GCEO" - OH189 SAFETEA-LU Earmark/County Engineer's Association Funding 4R47/4B87 (80% Federal) / 4BG7 (20% Local) - CAP = $257,664 (4R47) $3,400,000.00 (4B87) Federal dollars - Replacement of SFN 3030423 GUE CR 347 00.94 Intersect: Wills Creek; BR Eligible for Replacement: Length=117 SD/FO(1) SR=26.0 DSR=4~|~10 - Bridge Replacement~|~2E336C9E0049CBEC161D606D37B2BF1C0A5DA3B4 87339~|~1~|~1~|~01/STR~|~Resurfacing on SR 7~|~05 - 4R Maintenance - Resurfacing~|~4A4D6B7FF123A6BAF5E3E52332188EB0027179EE 87339~|~1~|~2~|~02/NHS~|~Resurfacing on SR 7~|~05 - 4R Maintenance - Resurfacing~|~600A8401868DE904801E12FA1AC0F3C3F9DCBE30 104504~|~1~|~1~|~01/BRO~|~Plan split for CEAO eligible funding for bridge and roadway work associated with the bridge (SLM 9.03; SFN 1830449) over Riverview Road/a creek, bridge (SLM 9.35; SFN 1830457) over Cuyahoga Valley Scenic Railroad, and bridge (SLM 9.68; SFN 1830465) over Canal Road.~|~13 - Bridge Rehabilitation~|~7CB202CDFA24F2DE3DD32D2C6E7EBBE50D1BC5D4 104504~|~1~|~2~|~02/NFP~|~Plan Split using 100% local funds for non-eligible work associated with roadway resurfacing items along Pleasant Valley Road.~|~13 - Bridge Rehabilitation~|~C1E7C74C7D7DB9C1605DD4FE1AA89433F1316121 119185~|~1~|~1~|~01/BRO~|~Plan split for HEN-109-0278 bridge~|~13 - Bridge Rehabilitation~|~B2672E7B6A2D4B397DDBF7B99938C4A618D25FE0 98998~|~1~|~1~|~01/S>2~|~Manville Rd~|~05 - 4R Maintenance - Resurfacing~|~4FEEA14F8DE4FE7CE57A5CECFF10C6F132348980 92527~|~1~|~1~|~01/BRF~|~Rehabilitate Bridge No. WAR-CR 200-0.96 (SFN: 8334404) by replacing the existing superstructure with a pre-stressed concrete composite box beam superstructure and complete minor substructure repairs and roadway related items. Structure carries Roachester-Osceola Road (CR-200) over Todd's Fork.~|~13 - Bridge Rehabilitation~|~DCC3373155FF17C368E0B2F2B8FAFA1A9A102EB5 113487~|~1~|~1~|~01/SAE~|~SRTS funded plan split - 100% 4HJ7~|~28 - Facilities for Pedestrians & Bicycles~|~7D7CF95A7E7B7040BCC2510C19DD27574C6A7481 119244~|~1~|~1~|~01/STR~|~All items of work associated with resurfacing of MRW-314.~|~05 - 4R Maintenance - Resurfacing~|~0717954711137A4B7687C6EB3E817203D97EBEE4 102808~|~1~|~1~|~01/NHS~|~NHS Pavement, LUC-20 from 8.00 to 8.86 and WOO-20 from 2.97 to 4.01 and WOO-20 from 4.45 to 4.63.~|~05 - 4R Maintenance - Resurfacing~|~4A95CA4EBDB6163D87B8B8E4699FAB381049C345 102808~|~1~|~3~|~03/S>2~|~S>2 Pavement. WOO 20 from 2.43 to 2.79 Perrysburg (Other)~|~05 - 4R Maintenance - Resurfacing~|~788DC6EDE80BD7264AB2BEE10D9E5BF741C07E9A 102808~|~1~|~4~|~04/NHS~|~NHS Pavement. WOO-20-2.79 to 2.97 Perrysburg.~|~05 - 4R Maintenance - Resurfacing~|~074BCBDD846F7EB537AB43D43C651AA267F917D8 102808~|~1~|~5~|~05/NHS~|~NHS Pavement. WOO-20 from 4.01 to 4.45 Rossford-- only half of roadway width (Split corp.)~|~05 - 4R Maintenance - Resurfacing~|~7B37F5173E5B65D82366BE903312FA4249904A06 102808~|~1~|~2~|~02/S>2~|~S>2 pavement. WOO-25 from 20.32 to 20.82.~|~05 - 4R Maintenance - Resurfacing~|~D7E38F9662BA062510E1EF75571636F91CB0DE79 113419~|~1~|~2~|~02/S<2/LON~|~80% CEAO CSTP Funding to resurface CR-13 from 2.123 to 4.615~|~05 - 4R Maintenance - Resurfacing~|~26067C0504B3C54ECDB3476DB201D9B58E98F9CD 113419~|~1~|~1~|~01/NFA~|~80% CEAO CSTP Funding to resurface CR 11, CR 34 and CR 77~|~05 - 4R Maintenance - Resurfacing~|~E8797FA6B3702D42FFAC42E6CD109C77998E11C4 113419~|~1~|~3~|~03/STR/LON~|~80% CEAO CSTP Funding to resurface CR 2 and CR 13.~|~05 - 4R Maintenance - Resurfacing~|~1371DCA3DAC1C5EFD678870619D02D872B39757D 114912~|~1~|~1~|~01/NFP~|~Crack Seal plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8E47B8B6B905F054F1E2A3D0FA421EE33B1273F5 96836~|~1~|~1~|~01/S<2~|~Install sidewalks gap closures and curb and gutter within the City of Urbana.~|~28 - Facilities for Pedestrians & Bicycles~|~9EBEBB294A1666CDA04A03DEC0BEF3798FA00ABF 96836~|~1~|~2~|~02/S<2~|~Install sidewalks gap closures and curb and gutter within the Township.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1C2241228A3D004F908A4ADDCAFA9FE7C8B63D73 96836~|~1~|~3~|~03/S<2~|~Water and sanitary work at the City's expense.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~24FC1F36C9890E61BEA3F085108B566DBCD49EF0 111542~|~1~|~1~|~01/MPO~|~TMACOG TAP funded items~|~28 - Facilities for Pedestrians & Bicycles~|~4D810AFD5402258205F4697B63ABB637CD782FC4 111542~|~1~|~2~|~02/NFA~|~Locally funded plan split to reconstruct Water St and install decorative, proprietary, and landscaping features.~|~44 - Other~|~8AF093DD546B7C07B9DFCAECEDF251656F9B40BD 116277~|~1~|~1~|~01/STR~|~Chip Seal, Pavement Repairs, Culverts to be completed by county forces~|~05 - 4R Maintenance - Resurfacing~|~B447A2587C5C923B0620324253E8E8C61CFFE7AA 105410~|~1~|~1~|~01/STR~|~Bridge repair/rehab on rural route bridge.~|~13 - Bridge Rehabilitation~|~7D4B98C462249A91E9D543A99EC0D14907D6FBBD 105410~|~1~|~2~|~02/S<2~|~Bridge repair/rehab on small urban route bridge.~|~13 - Bridge Rehabilitation~|~9321CB1B61044162249C9B6D7577EF6359028FA6 93236~|~1~|~1~|~01/MPO~|~Reconstruction including new roadway, curbs, sidewalks, street lighting and lawn areas along with striping of the bike lanes on Warren Street/Brown Street from Wyoming Street to Buckeye Street.~|~04 - Reconstruction - No Added Capacity~|~661899E778D2EDBE69F1FC1F1AB49581CF1C7788 105123~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~6653C4D4182E7C5722CF570990C1121433FA8274 91767~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a microsurfacing treatment. NOB 215 0.00-4.61. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~7DEDFD8359B45F36D18BF91A85BAA3804A7D5D6F 119910~|~1~|~1~|~01/STR~|~Culvert liner project. WAS 145 2.09 (CFN 1803736). Funded 80% Federal/20% State.~|~04 - Reconstruction - No Added Capacity~|~F7DB6137D0E9447EFFBF5852A514E52FA30FE1A6 83064~|~1~|~2~|~02/NHS~|~LAW US52 Brdgs F/Rehab:4400305 LAW SR650 4.28 Intersect: State Route 6504400364 LAW SR650 4.28 Intersect: State Route 65080/20 split~|~13 - Bridge Rehabilitation~|~7C495CC7AB84F96D731959849A5303EBAB954329 83064~|~1~|~1~|~01/NHS~|~LAW US52 2.17 - 5.00 resurfacing project~|~05 - 4R Maintenance - Resurfacing~|~5DC69DFA2FBAA6EB94E984A85E0BD1218575D5CB 101959~|~1~|~1~|~01/STR~|~Spot paving repairs at various locations on the follow routes:DEL-257 5.69 (Butts Rd CR 139) to 14.26 (SR 37)UNI 42 4.58 (US 33) to 9.89 (Delaware County lineUNI-739 5.94 (SR 347) to 14.13 (SR 31)~|~05 - 4R Maintenance - Resurfacing~|~35E93249E9F219D296272C6927743F22C3EEADE2 101959~|~1~|~2~|~02/S>2~|~Spot paving repairs at various locations on the follow routes:DEL-257 1.50 (N of old Zoo entrance) to 5.69 (Butts Rd CR 139)DEL-750 4.43 (SR 315) to 5.58 (US 23)~|~05 - 4R Maintenance - Resurfacing~|~B214300567E737ABE58D6915054CFDCFD493B568 112390~|~1~|~1~|~01/BRO~|~Funding Plan Split for Construction, update prior to plan file with an accurate description of the work.~|~10 - Bridge Replacement~|~B4C84755B9EBDE6DDD8B5EC72CC0B5DA56F3E701 102296~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on PIC-104-0.00 to 15.34~|~05 - 4R Maintenance - Resurfacing~|~82067F13CA0D729CA7ADAECDD15980D2C8E8722A 102296~|~1~|~2~|~02/STR~|~Work on three structures~|~47 - Bridge Preventive Maintenance~|~45269144116EDCF60787F07C824BB327C56C7A69 115990~|~1~|~1~|~01/STR~|~"01/STR/OT/ " 80% Federal (4SF7) and 20% State (4SS7) - repair of failed embankment~|~~|~34C8886289A32BEEA029F8F1F2200D2C40EC62CD 116355~|~1~|~1~|~01/STR~|~Resurfacing CAR-39~|~05 - 4R Maintenance - Resurfacing~|~987FE6B7B39D514F33227176CD485838D41E7395 116891~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~72E47C993ED5D88C9BB897A458328B3FB65B393D 116891~|~1~|~2~|~02/ENH~|~Pedestrian Improvements~|~28 - Facilities for Pedestrians & Bicycles~|~ED5C6D890C71EBB8DD7F459186E5052E901BD23D 104934~|~1~|~1~|~01/ENH~|~Construction of a 7' wide sidewalk on the east side of Montgomery Road from School House Lane to Radabaugh Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~8D8A073258DE7E43482EF67254ED7DDF330A474F 100652~|~2~|~1~|~01/IMS~|~Plan split to cover work on interstate bridges within Columbus metro.~|~13 - Bridge Rehabilitation~|~CC16BC1069A691DEB1885BFE45832A8B3D13B466 100652~|~3~|~2~|~02/NHS~|~Created plan split for work on NHS.~|~13 - Bridge Rehabilitation~|~90F89FFF93CA838932CD77BFD88CE1A3E70B1F17 87265~|~1~|~1~|~01/IMS~|~Concrete Pavement Repair project. WAS IR 77 6.59-16.37 SB only. Interstate route funded 90 federal/10 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~120CE1E9FC3D0AF272D96360F6982A611A51A331 100169~|~1~|~1~|~01/S>2~|~Mill & Fill Baumhart Road.~|~05 - 4R Maintenance - Resurfacing~|~65479A7C4E9B9EDB72879808FEE588A70CA95224 117664~|~1~|~1~|~01/SAF~|~All work is included in this split.~|~21 - Safety~|~6CE615F7BA055F7401EA050CAE453AD6EEB0F6EF 101007~|~1~|~2~|~02/NHS~|~SFN 8702160~|~13 - Bridge Rehabilitation~|~03996DB0FE0F847A5176DFC030C1326FC658B614 101007~|~1~|~1~|~01/NHS~|~Convert two, stop-controlled intersections to single-lane roundabouts at Interstate 75 in Bowling Green.~|~21 - Safety~|~8E8DF4D9F53F25CEFC3AE70ADA2B0D2D15A3BD60 101007~|~1~|~3~|~03/NFP/Bowl~|~Utilities~|~43 - Utilities~|~E4D232C3B2F214466B62ECB32A85130FA2C61425 84552~|~1~|~3~|~03/NFP~|~Paving at the Hollister Outpost.~|~05 - 4R Maintenance - Resurfacing~|~7B449921805DC7AC1749A07479955A1D580FC4FE 84552~|~1~|~2~|~02/S<2~|~Resurfacing project on ATH 13 and ATH 550. Urban other federal aid funded 80 Federal/20 State. ATH 13 2.709-4.617 and ATH 550 0.869-2.451.~|~05 - 4R Maintenance - Resurfacing~|~E33CD6F25CA1C25AA72CDB4DB0075B6B43F69EAB 84552~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. Rural other federal aid funded 80 federal/20 state. ATH 13 0.07-2.70, 4.61-16.41, ATH 329 19.65-19.99, ATH 550 2.45-6.94.~|~05 - 4R Maintenance - Resurfacing~|~2032997239A533865B19A005CE87A2C20DF394FC 106393~|~1~|~1~|~01/SAF~|~Plan Split~|~21 - Safety~|~06E07094DC36E086CD84FF6A6A7932F8AD15DDB2 110510~|~1~|~1~|~01/SAF~|~Intersection improvement project. GAL 160 9.57-9.77 and GAL 554 6.61. Safety funded 90 federal/10 state.~|~21 - Safety~|~9072033BF81BAE1411030E1FDDF177823A7C25A1 122455~|~1~|~1~|~01/STR~|~Work necessary to correct drainage deficiencies.~|~66 - Resilience Improvement - Highway Project ~|~2C9A79487B60F27BDA86C41C7C725B442CE7CECA 122455~|~1~|~2~|~02/STR~|~UNI SR 47: Work necessary to alleviate drainage issues~|~66 - Resilience Improvement - Highway Project ~|~250BCCD277ED6D0D3EE22173700DE7DA37F2F3E2 102095~|~1~|~1~|~01/NFA~|~The Port is assisting the City of Columbus and the Rickenbacker International Airport with the expansion of a new air cargo terminal. This project includes the upgrade and reconstruction of 520 feet of George Page Jr. Road.~|~04 - Reconstruction - No Added Capacity~|~6F5F4BC4E5C8EC857B1EC4F7C388BD0001321F60 106674~|~1~|~1~|~01/ENH~|~Paving of the Conotton Creek Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~CA50B6B7B0DA8A895A0F16087E36469CF599B343 81639~|~1~|~1~|~01/NHS~|~Resurfacing of POR US 422 from 0.17 to 1.94.~|~05 - 4R Maintenance - Resurfacing~|~952B31E93D413038D2C6822D5F05E17FBE8995DC 81639~|~1~|~2~|~02/NHS~|~Replace the following culverts CFN 674220040 POR-422-0.22CFN 674220050 POR-422-0.27CFN 674220110 POR-422-0.74CFN 674220130 POR-422-00.84~|~05 - 4R Maintenance - Resurfacing~|~A296C72C50787CDF3BB6897E35C5CEAEEB4269D6 93233~|~1~|~1~|~01/MPO~|~Construct a bikepath from Wyoming Street and Steve Whalen Boulevard to Cleveland Park. The bike path will be built through Highland Park to Deanwood Avenue. Also a bike Boulevard along Deanwood Avenue to Santa Cruz Avenue in Cleveland Park. A bike path will be constructed through Cleveland Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~95A2552A4BA05D5612A396172192E7A5F34788D2 123677~|~1~|~1~|~01/STR~|~culvert split.~|~04 - Reconstruction - No Added Capacity~|~ED5C460DF0D426F3D6F5EED3C534DDCD62301E18 83063~|~1~|~1~|~01/NHS~|~JAC SR32 12.47 - 17.54 Resurfacing ProjectJAC SR32 12.47 - 17.54 Resurfacing ProjectBegin project 0.72 mile east of the US35 underpass and end project 0.35 mile west of the Wellston corp limit. It is proposed to resurface the highway with asphalt concrete and to resurface Ramps A, B, C, & D of Interchange # 049200. Pave Thru Brdgs.4002210, 13.08 4002229, 16.57 Intersect: Meadow Run80/20 split 01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~2356610A3A6352DE47E760CBC15D491111AA0C9D 83063~|~1~|~2~|~02/NHS~|~JAC SR32 12.47 - 17.54 Resurfacing ProjectBrdgs to rehab under Rural portion of NHS (12.47 - 16.37):4002164, 12.55 Intersect: Lick Run4002199, 12.55 Intersect: Lick RunBrdgs to rehab under Urban portion of NHS (16.37 - 17.54):4002237, 16.58 Intersect: Cty Rd 78, Fairgreens Rd4002245, 17.12 Intersect: State Route 3274002253, 17.12 Intersect: State Route 32780/20 split02/NHS/BR/State~|~13 - Bridge Rehabilitation~|~5B407457BEFC04C535DB308F0FC4E0A0DD1CEA8E 83063~|~1~|~3~|~03/SAF/JAC~|~The addition of guardrail on CR 10 - Patterson RD~|~21 - Safety~|~6C25CF43217F417B83BAC9701851521E4C99D14F 21642~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Cos SR 751 00.00 to 04.01; 2) Gue SR 265 4.58 to 17.49; 3) Gue SR 265 17.49 to 17.60; 4) Gue SR 821 0.00 to 00..47; 5) Gue SR 821 0.60 to 3.40; 6) Kno US 36 20.85 to 35.87;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~78EA12152A9BAB21F27E7491B8A820BAAD9FE4B3 21642~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing on: 1) Gue-SR 821-03.41 to 05.45; 2) Kno-US 36-20.68 to 20.85;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5DCBB62F23D4306F93DFB74B9183A3AC7E296348 21642~|~1~|~3~|~03/NFA~|~"03/PV/NFA/ " - District Preservation Funding 4PS7 (100% State) - No CAP - Crack Sealing on: 1) Cos-SR 751-4.01 to 11.42; 2) Gue-SR 672-00.00 to 00.86; 3) Mus-SR 340-0.00 to 03.64; 4) Nob-SR 340-00.00 to 00.71; 5) Nob=SR 672- 00.00 to 00.37;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C0BB93BE0B249EDC7280A36B06A591BBA476B9CE 118560~|~1~|~1~|~01/S>2~|~Split for eligible urban paving work items utilizing district allocation~|~05 - 4R Maintenance - Resurfacing~|~430B676E9DD94B4C422214696A82766994FFB6A9 118560~|~1~|~2~|~02/S>2~|~Plan Split for local funding of non-eligible urban paving items.~|~05 - 4R Maintenance - Resurfacing~|~0F093B8D6559139F03A36F4E16B0C73F7053FF4D 94044~|~1~|~1~|~01/IMS~|~Maintenance contract for traffic signal repair.~|~44 - Other~|~A70BFBD45DD8A82A6780E0BC90C239724064BE75 122501~|~1~|~1~|~01/BRO~|~Superstructure Replacement~|~10 - Bridge Replacement~|~CE2FE20E0E946A3295A06EACBDBF8F510F338F6D 94169~|~1~|~1~|~01/BRO~|~Replace superstructure - BR eligibleSFN 2401215, FAY-62-4.65, over Rattlesnake Creek~|~13 - Bridge Rehabilitation~|~E20ACC5EDA6AE8AAFB348E4DDD0D7D5AB6C49DFE 114876~|~1~|~1~|~01/NHS~|~Overlay JAC 35~|~05 - 4R Maintenance - Resurfacing~|~DEE2A52D5FF9D0631FB3B513974F20A972597E97 114552~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~256243CA7550BBC994A99F853F68B1F386F6BAB9 114552~|~1~|~3~|~03/NFA~|~Resurfacing Not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~DF2DDC792AAB21E0F9436571F0EDD188B036F0BF 114552~|~1~|~4~|~04/S5K~|~Install pavement interlayer on SR362 in Ft Loramie - 100% local funds~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~38CB78244BDFAC542CB04CC1FD7DABD3C2185445 114552~|~1~|~2~|~02/STR~|~Resurfacing with Asphalt Concrete~|~05 - 4R Maintenance - Resurfacing~|~E10EE88E35501F46FAB0071C24A83AEB64CBF9B9 95103~|~1~|~1~|~01/S>2~|~Resurfacing of West Market Street, including curb ramps, guardrail, signing, and pavement markings, in the City of Warren, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~5EE74A19B4351AD0C0730786C0EA478FE7B5EB2C 124294~|~1~|~1~|~01/ENH~|~Shared use path repairs utilizing 100% Federal funds (TAP and Safety) up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~8CCC5CD815EFDB376CB5B10CFE963AB875954AAA 117817~|~1~|~1~|~01/BRO~|~Plan Split for rehabilitation of eligible bridge on NHS route~|~13 - Bridge Rehabilitation~|~514B7636687E2A99492B8564B126689A4F05B3F3 126663~|~1~|~1~|~01/NFP/GCEO~|~Resurfacing and related roadway work on CR 54.~|~05 - 4R Maintenance - Resurfacing~|~359089965DA3D37B7F87106D7802ED3CAC052651 102346~|~1~|~1~|~01/NFP~|~Split for mowing~|~44 - Other~|~DD643B06A51519F1339CBF1AC28C87E184747684 108875~|~1~|~1~|~01/S<2~|~Urban Paving Program mill and fill on CHP US 36 14.04 to 14.88~|~05 - 4R Maintenance - Resurfacing~|~E43B4876A9960D9342C274EC4DFDBFFDE8879F9A 95450~|~1~|~1~|~01/SAF~|~Construction of roundabout at the intersection of CR11 (Alkire Road) and CR25 (Demorest Road).~|~21 - Safety~|~E4B43605AAA630AEBA2BDD0355A153AA502211B2 22778~|~1~|~1~|~01/IMS~|~Provide new MSC overlay on BEL-470-0654(SFN 0706396). Replace Pin/hanger assembly with new or by making continuous. Paint end spans of structural steel and replace/repair crossframes.~|~13 - Bridge Rehabilitation~|~05A6007A8181BD94971A3EF3274E3B130178FF49 108028~|~1~|~1~|~01/NFP~|~Crack Sealing~|~44 - Other~|~D125B91E9C01A2E5733A085227BA482FD3FB0780 123830~|~1~|~1~|~01/SAF~|~Pavement Marking FY2031.~|~21 - Safety~|~DCC3AA94B58CB44087F137BD4EBFEC4DF4B8A7C5 127273~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. FAY-CR 47-3.85 (SFN 2430878) carrying Miami Trace Road over a CSX railroad track. Replacement of superstructure and repairs to existing substructure. ~|~10 - Bridge Replacement~|~CF17B0CC01BA3C86A9320F2F788E6953F70BAFC3 117178~|~1~|~1~|~01/S5K~|~HOC-Logan Resurfacing FY25~|~05 - 4R Maintenance - Resurfacing~|~57E614FE96880ECEFC4D20EB173880DE5ECE4752 77583~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~2362AC8EBEF999FFAEEE6652C0279876F6B6CD49 114911~|~1~|~1~|~01/NFP~|~Crack Seal plan split~|~99 - State Preventative Maintenance~|~BC12FB2E8A477728C32E5A4894EB2F35BBC3BBCB 80815~|~1~|~1~|~01/ERD~|~Upgrade and widen the intersection of SR 14 and Washingtonville Road/East Street. Signal installation is included. This amount is capped from the total earmark amount of$729,074~|~04 - Reconstruction - No Added Capacity~|~7E997C679799B7769BBFE8A5A973577CF6508DED 121150~|~1~|~1~|~01/STR~|~All Work is within this split~|~05 - 4R Maintenance - Resurfacing~|~F829E1E87ED264EDDBBBA5F700A660066C1002B8 111529~|~1~|~1~|~01/MPO~|~MPO CMAQ funded items~|~21 - Safety~|~4CC3C052D1F2A1542C992D74ADA2C1C3901585C7 107699~|~1~|~2~|~02/S<2~|~Resurfacing on US 224 inside the Findlay Urban Area using district preservation funds (80% 4PF7 and 20% 4PS7). Work is from the Findlay Urban Area boundary at CR 140 at SLM 10.75 to just west of the west corporation limits of the City of Findlay at SLM 11.54. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~59608768B2E9B0E11585ED17781C445427F9EDAB 107699~|~1~|~1~|~01/STR~|~Resurfacing on US 224 outside the Findlay Urban Area. Work is from SR 235 to the Findlay Urban Area boundary at CR 140 at SLM 10.75. Also resurfacing on SR 103 in the Village of Bluffton in Allen County. No local funds. District preservation funds (80% 4PF7 and 20% 4PS7)~|~05 - 4R Maintenance - Resurfacing~|~DE7C95D843D40B31267E832246463EFAF0A5BABD 107699~|~2~|~3~|~03/NFP~|~Work to raise the roadway elevation on US 224 roughly at the intersection of CR 223. The Hancock County Commissioners are the sponsors of this work. Funds for this work will be provided by Hancock County.~|~04 - Reconstruction - No Added Capacity~|~052F9BFCACFB1F877214E504676EDD6C1C906BBA 85095~|~1~|~1~|~01/STR~|~Plan split for 100% state funded items associated with culvert work.~|~44 - Other~|~6FC4EC5E51B5DD1CAB51B1FDE9A3091C1327B285 100807~|~1~|~1~|~01/IMS~|~Replace bridge deck and paint bridge PRE-35-1.76L that carries Westbound US 35 over I-70~|~13 - Bridge Rehabilitation~|~8A7C8E1390081A34D0001C0ABC90B5A24D457BD0 100807~|~1~|~2~|~02/IMS~|~Mill & fill the 35 WB ramp~|~05 - 4R Maintenance - Resurfacing~|~1620A89FFA78AEF7DF71FCE9D80BC4FE48F60A88 102169~|~1~|~1~|~01/NFA~|~The City is constructing SR741 road improvements to support a new Masters harmaceutical headqtr and distribution. Adding a northbound left turn lane and southbound right turn/deceleration lane and related intersection improvements to align with Weldon Dr.~|~01 - New Construction~|~B99EB213991713A345B7DC600C0D7BF26E3A4E1F 83011~|~1~|~1~|~01/IMS~|~Plane and pave the 74/275 overlap in Hamilton County~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2078E854D80537AD817B7DF3BC8D4792DCEAB47D 83011~|~2~|~2~|~02/BRO~|~Bridge rehabilitations include rigid overlays, painting, scour repair and other mionr rehab items. Approx. project limits are from the western IR 74/275 interchange to the eastern IR 74/275 interchange.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4571D7F66F84AC72DDE6AC9C515CE5C1CE27DDFA 124050~|~1~|~1~|~01/NFP~|~Plan split for guardrail replacement work~|~21 - Safety~|~652C6E0DC125D8516F12A43F7A0B77BA942A7CD5 124050~|~1~|~2~|~02/NFP~|~Plan split for guardrail maintenance and repair work~|~21 - Safety~|~27C320AB88B3903AFCFD61E35E1BC4BDAB58B9E3 25062~|~1~|~2~|~02/S>2~|~Plan Split for SFN 5004985 MAH SR 289 04.85 over Tributary of the Mahoning River~|~10 - Bridge Replacement~|~8F67CD266D412927CDF32F1C3D34310C3152BBCC 25062~|~1~|~1~|~01/S>2/CAMP~|~Plan Split for Paving MAH SR 289 3.71 to 5.69 all in the City of Campbell.~|~05 - 4R Maintenance - Resurfacing~|~94340178A18AFC65541586F228D27D4C0FF3CBA2 102219~|~1~|~1~|~01/NFP~|~LAW CR 144 1.46~|~44 - Other~|~9431C2CAF774D49FFF86C8A4A924A9FB4E6FB143 101424~|~1~|~1~|~01/IMS~|~Microsurface HAM IR 71 SLM 17.88 to 19.89~|~05 - 4R Maintenance - Resurfacing~|~EB7650A06154F729DDF0BD41132883D3021C102A 93720~|~1~|~1~|~01/NFA~|~Add Information~|~44 - Other~|~F9729ABBC74D0D4BF65DE56DE6B0938A6191097D 123574~|~1~|~1~|~01/S>2~|~Crack sealing in D8. Routes TBD~|~05 - 4R Maintenance - Resurfacing~|~0F4A244268895434CAD1813D2C4F9C5375A2305D 105337~|~1~|~1~|~01/STR~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~41B148377BF7B9FAE0D8447849FFEEE13EC25D4F 105337~|~1~|~2~|~02/S<2~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~1D56888AD530DE4D7BAD646570E1B961DC7BDC7A 87278~|~1~|~1~|~01/S<2~|~Resurfacing on SR 147 in the Bridgeport-Wheeling urban area (SLM 33.48 to SLM 34.90)~|~05 - 4R Maintenance - Resurfacing~|~8D9AD329FAFFD467373C6C0A00CEFF5CB035029D 87278~|~1~|~3~|~03/NFA~|~Resurfacing on SR 147 on the non federal aid portion (SLM 20.27 to SLM 29.18 and from SLM 29.30 to SLM 33.48)~|~05 - 4R Maintenance - Resurfacing~|~D7232FCBDCA607D1693016EFE9DFDC79EEEF2055 87278~|~1~|~2~|~02/STR~|~Resurfacing on SR 147 in the rural section (SLM 29.18 to SLM 29.30)~|~05 - 4R Maintenance - Resurfacing~|~DF8C4FF7EAB3BD61667F6688396E0233C87D3223 107619~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - For complete upgrade of signals or flashers at various locations in District 5.~|~21 - Safety~|~B6817A4CF82DC85F1C240B4FB8E313568092DB06 107099~|~1~|~1~|~01/SAF/KCEO~|~Knox County Engineer's CEAO HSIP Funding - 4HB7 (100 % Federal) - See CAP comment - Project for Pavement Markings to be upgraded or replaced on various County Routes within Knox County.~|~21 - Safety~|~3A228419DDAD7720826DECDDE36CA978514E1600 105831~|~1~|~1~|~01/MPO~|~Replacement and resurfacing of St. John's Terrace, Blue Ash Road, and Orchard Lane (between Plainfield Road and Sycamore Township), replacement of curb and gutter, driveway aprons, and sidewalk. Installation of signage and pavement markings, and reconfiguration of the existing RR crossing at the south side of Chamberlain Park to make the crossing ADA accessible.~|~28 - Facilities for Pedestrians & Bicycles~|~593F1687D57AEAD7290F52778CC567C6D38FF139 105831~|~1~|~2~|~02/MPO/GCWW~|~Plan split for 100% locally funded waterworks improvements to be constructed as part of this project.~|~43 - Utilities~|~F16B699ACAD6D2B10F18F059297ED4B983C4FE5C 105197~|~1~|~1~|~01/STR~|~AC Overlay with repairs on:BUT-130 SLM 0.00 to 4.05~|~99 - State Preventative Maintenance~|~A9DF86895BDA3E2B35C87E5929F83A353BAFEBE6 105197~|~1~|~2~|~02/S>2~|~AC Overlay with repairs on:BUT-130 SLM 4.05 to 4.70~|~99 - State Preventative Maintenance~|~60BDFAECE0142F0341F3CA992D0556151F75A47A 90893~|~2~|~2~|~02/S<2~|~Urban System Paving- City of Salem; includes curb ramps and auxiliary pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~02C4DD251DB24AA98BF657E62335010286ADC791 90893~|~1~|~1~|~01/S<2~|~Urban System Paving- City of Salem; COL-14-1.78 to 2.43/3.82 to 4.34 and COL-344-0.12 to 0.29; includes asphalt resurfacing, long line pavement markings~|~05 - 4R Maintenance - Resurfacing~|~A7DC299C165F6A7973AF21E4717A51ED7C9B4781 90893~|~1~|~3~|~03/NHS~|~Urban System Paving- City of Salem; COL-9-13.55 to 14.06, 14.33 to 14.72, 15.13 to 15.64; includes asphalt resurfacing, long line pavement markings~|~05 - 4R Maintenance - Resurfacing~|~ABDEC12556B5389AD03A0979976DF10536D371DC 108747~|~1~|~1~|~01/STR~|~JAC 139 10.52 Bridge replacement~|~10 - Bridge Replacement~|~968EDEF43BE870E813D7BB2C2E2C6DF839D40E36 105576~|~1~|~1~|~01/S<2~|~RIC-SR-39 14.980 SFN 7002165 (OVER TOBEYS RUN) New Construction ? Structure(repl) (002) ~|~10 - Bridge Replacement~|~9914E9B44F342FDF0B080C7670D513C6704E996E 113746~|~1~|~1~|~01/SAF~|~Safety funded signal items~|~17 - Construction Engineering~|~B59B1FB51E2DE8BD530E52F82336F91ED1C8997A 102331~|~1~|~1~|~01/NHS~|~Resurfacing of TRU US 422 from 0.00 to 2.05.~|~05 - 4R Maintenance - Resurfacing~|~544BD4516B1DBC78040094B09607FDF065867795 102331~|~1~|~2~|~02/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~596FD6E9539BFE85DF2EA51672B2F0718DFA6C77 107406~|~1~|~1~|~01/IMS~|~Rehabilitation of bridge~|~13 - Bridge Rehabilitation~|~51C4432EF151FF8424A7D56D09A73ED99649EDAD 111162~|~1~|~1~|~01/NFP~|~Campground resurfacing~|~28 - Facilities for Pedestrians & Bicycles~|~FA7311635F10719B7B17D1307391EC0EF3C8F074 105113~|~1~|~1~|~01/NFA~|~BRO 221 5.54 (SFN 0802913) bridge replacement.~|~10 - Bridge Replacement~|~2B57395EA96C87B7B02C6589CBFC2AA385D5F23F 105113~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~DDEDFDDBD569CAD716738460EA32B92E163EAD4D 87451~|~1~|~1~|~01/S>2~|~Colerain Ave: I-74 to Blue Rock Rd; Blue Rock Rd: Colerain Ave to Spring Grove Ave; Elmore St: Colerain Ave to Spring Grove Ave Colerain Avenue: Widen the roadway to standard lane widths with new pavement, addition of curb, tree lawn, and sidewalks, and addition of left turn lanes where needed. Blue Rock Road: Realign the Blue Rock/Colerain intersection, construct standard lane widths with new pavement, addition of curb and sidewalk, improvements to the Blue Rock/Hamilton intersection, and realignment of the Blue Rock/Spring Grove intersection. Also restripe and resign the Colerain Ave-Spring Grove Ave/William P Dooley Bypass-Elmore Street triangle to improve efficiency. Sponsor - City of Cincinnati~|~21 - Safety~|~7ADD024924CBB9B2F0513BB65D1E66393023E987 116503~|~1~|~1~|~01/NFA~|~Adding plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~807B75FC0AA291BE06FCA01135B57D757092602A 97433~|~1~|~1~|~01/SAE~|~Installation of new and upgrade of existing guardrail on various Medina County roads.~|~21 - Safety~|~A998242E70056512E2CBCB4E5419705C03B8AF44 106256~|~1~|~3~|~03/STR~|~Resurfacing adjacent to the Village of Bluffton project. Work from the Norfolk Southern overpass at o.44 to the Norfolk Southern at grade crossing at 1.75. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~22F5AA95B8F40F0B677693E60E72AA3DBD2638E0 106256~|~1~|~1~|~01/STR~|~Work on the SR 103 from the Norfolk Southern at grade crossing at 1.75 in Allen County to the west side of Citizens Parkway at 0.19 in Hancock County. Work funded with funds from the District Preservation Program budget. No local funds. The District has committed to pay for the top 3 inches of asphalt on SR 103. The District will also pay for pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~DD1527DB8ACAED6889B6D5574B44CD14C3DA4E25 106256~|~1~|~2~|~02/STR/BLUF~|~Work on SR 103 from the Norfolk Southern at grade crossing at 1.75 in Allen County to the west side of Citizens Parkway at 0.19 in Hancock County. This is for all the project not funded with funds from the District Preservation Program budget. Currently it is unfunded. After funds are received the work may be in more than one split.~|~04 - Reconstruction - No Added Capacity~|~5AFFE49787B72E06601F0D48DF1EC1978C3C9071 121064~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4D255591CE1FCBE03C7B27C6BB4A932AFD1F3610 121064~|~1~|~2~|~02/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~86B88E7F9E5A1AABF80FD77F6C9BEABBBE37B8D3 121064~|~1~|~3~|~03/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~586196DB3FEE94C918A651A4B849DFFD83CD792D 121064~|~1~|~4~|~04/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5E05E05281C13D08514C22327E00FCE39267A9E3 121064~|~1~|~5~|~05/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~59C3A121D9F589DA0E3E0E23686921592B612B1D 115928~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over Small Run.~|~04 - Reconstruction - No Added Capacity~|~C9E0683966EA6369586C9CEA9541FD9BCED6DE44 108520~|~1~|~1~|~01/NFA~|~The City will extend Production Drive.~|~01 - New Construction~|~037B5D6E29B2085787EFB321610FB07056795E65 109415~|~1~|~1~|~01/BRO~|~Bridge replacement project 80% 4B87 (CEAO) and 20% LNTP (Local)~|~10 - Bridge Replacement~|~4CF74D01D7578FF5E9A24D657117DB4A90CAB9ED 99555~|~1~|~1~|~01/NFA~|~Add sidewalk along N. Murray and Mount Vernon where it is missing.~|~28 - Facilities for Pedestrians & Bicycles~|~6DAB3399F743E287C839737A14085EDBE77307B1 110859~|~1~|~1~|~01/S<2~|~Major new funding plan split~|~04 - Reconstruction - No Added Capacity~|~7678EA761294ED325EFEDDB525F9C3DFAC6D3E45 81715~|~1~|~1~|~01/BRO~|~Replace existing bridge (CAR-212-0719, SFN 1001566) with a Type A culvert~|~10 - Bridge Replacement~|~3F73B2FFBF0151A36CB4B8E65E6B1261D8E75DF1 84452~|~1~|~1~|~01/IMS~|~Bridge painting project. NOB IR 77 0136 L (SFN 6100090), NOB IR 77 0136 R (SFN 6100120), NOB IR 77 0746 L (SFN 6100481), NOB IR 77 0746 R (SFN 6100511), NOB IR 77 0820 (SFN 6100546), NOB IR 77 1096 L (SFN 6100570), NOB IR 77 1096 R (SFN 6100600), and NOB IR 77 1581 (SFN 6100813). 90% Federal and 10% State.~|~13 - Bridge Rehabilitation~|~2A0CF96E4997A25271B55AE95B598098626D3E7E 84452~|~1~|~2~|~02/BRO~|~Bridge painting project. NOB IR 77 0574 (SFN 6100457). BR eligible funded 90 federal/10 state.~|~13 - Bridge Rehabilitation~|~A6DFD2C4AABE26CA20DC8942D4D4A169360AB339 110919~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County CEAO Bridge Replacement Project - 4B87 (100% Federal) - See CAP Comments~|~10 - Bridge Replacement~|~7A0B683A711C0191B89AD6B48F7D54D38A37137D 119070~|~1~|~1~|~01/MPO/DELH~|~ Installation of new signals at Delhi Avenue and Klemme Drive and at Delhi Avenue and Delhi Towne Square. Widen approach of Klemme Dr South of intersection. New sidewalks.~|~21 - Safety~|~957009A3F50C4FB9E72516CF612A8296F83DFE5A 126355~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~399A05BBE54579A65A903FFBBAE10261C2FDF761 111207~|~1~|~1~|~01/MPO~|~MPO Funded Plan split~|~04 - Reconstruction - No Added Capacity~|~467A40F066E5F1367743B6115A7FC15DD39F82BB 92373~|~1~|~2~|~02/STR~|~For bridges on SR-191.~|~13 - Bridge Rehabilitation~|~B5449A94B872AAB467DED5E07AA937E62454B613 92373~|~1~|~1~|~01/STR~|~resurface WIL SR 191 4.95-9.87 - Horton Rd to US-20A~|~05 - 4R Maintenance - Resurfacing~|~41C0439ED1A40F3F753092EC0D68EFAC7C40E1B7 111008~|~1~|~1~|~01/SAF~|~Extending TRU SR 46 SB Right Turn Lane from Hidden Hills to Dawson.~|~21 - Safety~|~0DB25B162EA0D80A7C3E3429FE9DC18D3093650C 119247~|~1~|~1~|~01/IMS~|~All items of work associated with resurfacing of I-270.~|~05 - 4R Maintenance - Resurfacing~|~6D5BBBAE720CBC9AB1D144ACCFD93D456A5930C4 119247~|~1~|~2~|~02/NHS~|~All items of work associated with the resurfacing of SR-161~|~05 - 4R Maintenance - Resurfacing~|~6219D81188B2C2811BEF8101132633897DC03C02 119247~|~1~|~3~|~03/S>2~|~All Items of work associated with the resurfacing of SR315.~|~05 - 4R Maintenance - Resurfacing~|~BC991CC8BA501CB4F6EE9F6630FCD92FEC51A128 119472~|~1~|~1~|~01/SAE~|~Split for safety improvements~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~998B1602BB99C91900DB16B6D80162D027719DEF 110263~|~1~|~1~|~01/NHS~|~Culvert liner project. ATH 50 26.52 (SFN 0501970). NHS route funded 80 federal/20 state.~|~~|~CE9586AF1602CF0CDD947E600BDD9CDC2A029297 93262~|~1~|~1~|~01/STR~|~Rebuild and replace deck edges, refurbish abutment bearings, and coat ends of beams on SFN 1904175 DAR 721 0204 over Greenvile Creek.~|~13 - Bridge Rehabilitation~|~04F506451B55E5AB84960BEE85EF5E90D004902E 115773~|~1~|~1~|~01/STR~|~Bridge Replacement.~|~10 - Bridge Replacement~|~BD4992D5CD855EA2C02C67A2FD46AE8E8FABF392 93302~|~1~|~1~|~01/S<2~|~Circleville urban paving and in urban func class area:PIC 56: 19.57-20.66~|~05 - 4R Maintenance - Resurfacing~|~2335409155B9EFD60E946D88B903FCB0DC17BC50 93302~|~1~|~3~|~03/STR~|~General system paving and in rural func class areaPIC-56: 22.04-33.93PIC-180: 0-0.48~|~05 - 4R Maintenance - Resurfacing~|~5DB25D350D4E2505B3A36B0859879C51088D9A4B 93302~|~1~|~2~|~02/S<2~|~General system paving and in urban func class areaPIC-56: 20.66-22.04~|~05 - 4R Maintenance - Resurfacing~|~FAC87EBC93B6F1415AC91F195B379EBE91347EAB 92562~|~1~|~1~|~01/S>2/CANT~|~Safety improvements.~|~~|~FE8280425264174A91E929F62B4F4731A402E7CA 118815~|~1~|~1~|~01/S50~|~All work included in this split.~|~05 - 4R Maintenance - Resurfacing~|~AA4DCB2C12F83CE65DE9ED65228BDE3BEDB43BC6 93760~|~1~|~1~|~01/ENH~|~Contruction of multi-purpose trail between Post Road and Solon Trail, in the City of Twinsburg.~|~28 - Facilities for Pedestrians & Bicycles~|~8BD33FE288BB2875612D9D6A6B6A2974E7E1E1F8 102964~|~1~|~2~|~02/NFA~|~Smooth seal on Non-Federal Aid routes: LOG SR 347 SLM 2.37 to 2.56 & AUG SR 385 SLM 0.00 to 3.93.~|~05 - 4R Maintenance - Resurfacing~|~9DD4F24CE9BF6B387DA511E97B51AECC6134E9C5 102964~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: LOG SR 540 SLM 3.81 to 8.72, LOG SR 347 SLM 2.56 to 3.63 & LOG US 68 SLM 10.48 to 11.43.~|~05 - 4R Maintenance - Resurfacing~|~63F841AFB2DD69E229A0C66FB07313B0CAA4B539 102964~|~1~|~3~|~03/NHS~|~Smooth seal on NHS route: LOG US 68 SLM 10.09 to 10.48.~|~05 - 4R Maintenance - Resurfacing~|~D0CD6FEAC6D5C009EBEBFD034E1E40C34D2DF657 119208~|~1~|~1~|~01/NHS~|~All items associated with resurfacing of US 33.~|~05 - 4R Maintenance - Resurfacing~|~46237FDF51C82413D8A73CC5322483C836A97A2E 123457~|~1~|~1~|~01/IMS~|~Apply recessed and wet reflective markings in D-05.~|~21 - Safety~|~1662737DEF47E85B53ADA26BF6EDD32882B05FAB 106291~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in POR, STA and SUM counties.~|~21 - Safety~|~BE4ACC8C448D1348C23EAE4CDB68E8066E2D9A73 97168~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 233 1.66, SFN 2703092. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~E2D74367C660743F62D7797562883C78CE48FABC 108421~|~1~|~1~|~01/NHS~|~Bridge Plan split~|~13 - Bridge Rehabilitation~|~0C5C272359214CDDC9F9D88A6D424811EC98A289 124625~|~1~|~1~|~01/IMS~|~All work included in this plan split.~|~04 - Reconstruction - No Added Capacity~|~1F16212B9F845B8FC695823E7C795FA9628154EE 110471~|~1~|~1~|~01/SAF~|~Install left turn lanes along SR 43 in both NB and SB direction~|~17 - Construction Engineering~|~1AEAC358B566C0EAC9A3AA33CD12997C06A5AF42 110471~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~5CBEC5860ADD3968AFA0AED3E7923C6BA1E7CFA1 99867~|~1~|~1~|~01/BRF~|~Replace 4 cell concrete structure (SFN 5060206) over Sugar Creek with a Type A precast concrete arch structure including wingwalls and rock channel protection. Includes installation of guardrail, waterproofing and other miscellaneous work.~|~~|~57E8D6F4D413F1478CEEAB795AA360A6EC84F16F 105304~|~1~|~1~|~01/IMS~|~Resurface portions of IR 71 in Hamilton County~|~05 - 4R Maintenance - Resurfacing~|~63B132E68AF82A92052FBB7E3859A7D732B9982D 110999~|~1~|~1~|~01/STR~|~Split for bridge replacement work~|~10 - Bridge Replacement~|~CF0F88EE9F91CD06D2CA14D0FF1E15ADB39113D8 98150~|~1~|~1~|~01/S<2~|~0.00 to 2.6~|~05 - 4R Maintenance - Resurfacing~|~5191F7CC288E81CEB1193AC3FDE6EF0B5D751750 111418~|~1~|~1~|~01/SAF~|~Signal replacement at MAH SR7 and SR164 in North Lima, Mahoning County, Ohio.~|~~|~A8E089044FAC9080D843426D8B01B53002889E96 101325~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for the following STP Rural routes: MRW-746-0.00-3.08 UNI-161-6.31-12.19 UNI-347-0.00-4.23 UNI-739-14.74-22.68 UNI-47-0.00-7.57~|~05 - 4R Maintenance - Resurfacing~|~7A6C308E05B224EE6CA5EA4A911913C6D5C0AC91 101325~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for the following STP Rural routes: MRW-746-0.00-3.08 UNI-161-6.31-2.19 UNI-347-0.00-4.23 UNI-79-14.74-22.68 UNI-47-0.00-7.57~|~17 - Construction Engineering~|~4CFB2EC5A39F0E782B04D824FA70CCA487FC7CD5 114150~|~1~|~1~|~01/SAE~|~Signing and pavement marking improvements. Funding is 100% federal funds from the Safety program until the cap is reached. After the cap is reached all funding will be provided by Allen County. Safety funds are for the Construction Contract subphase. The Construction Engineering subphase is 100% local funds.~|~21 - Safety~|~94BC44BD4ABA690C8B1CDFE2DD4B9E51A4EA5360 114150~|~1~|~2~|~02/NFP~|~Sealer to be put on the road and funded with 100% local funds provided by Allen County.~|~44 - Other~|~52E4A5315CA078D3D03EF9E89697F758FC9A2255 98081~|~1~|~1~|~01/NHS~|~Project will convert the existing intersection of US-42 (N. Columbus Street) and E. Church Street to a modern roundabout. Pedestrian facilities, curb and gutter, and storm sewer system will be constructed as part of the improvements.~|~07 - 4R Maintenance - Relocation~|~9342CC2F599F0062A7D3430B3B1A5D0A626F8533 110041~|~1~|~1~|~01/STR~|~Culvert replacement/repair project. GAL 218 7.87 (CFN 1819482), GAL 553 2.02 (CFN 1820266), GAL 554 13.09 (CFN 1834854) and GAL 790 6.66 (CFN 1820260). Funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~FAAF235EB55D471292F29D9BD2E60F648726A411 93275~|~1~|~1~|~01/BRO~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4200721 & 4200756 KNO SR13 18.33 Intersect: Trib Of N Br Kokosing Riv; BR Eligible for Rehabilitation: Length=67 SD/FO(1) SR=67.4 DSR=7~|~13 - Bridge Rehabilitation~|~6670B1B4959E309058B62B2F084B475C225F1DC9 95585~|~1~|~2~|~02/IMS~|~ASD-71-7.47 bridge (Interstate bridges under 20 ft).RIC-71-16.45 bridge (Interstate bridges under 20 ft).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~25566E6F03540DA41E7CEBB35FCC91E38F4F6C63 95585~|~1~|~3~|~03/NHS~|~RIC-30-8.20 bridge (NHS bridge under 20 ft).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9DE1F267EBD21A8EA338D773AB3F45168B6407CF 95585~|~1~|~1~|~01/IMS~|~ASD-511-10.59 bridge over I-71 (Interstate bridge over 20 ft).~|~13 - Bridge Rehabilitation~|~9DB6737002AEE5DB9B7AC228C62C4221D2E7D571 104915~|~1~|~1~|~01/NFA~|~Cham pion Schools school bus replacement project~|~44 - Other~|~19F64783F8AF91DA79E9651A163E4C33EBA46935 94152~|~1~|~1~|~01/IMS~|~Resurfacing of I-71 from SLM 0.00-14.98 No bridge work at this time~|~~|~A51FD567F9A26F20DCCE64B2F1F61D7DC15DFD5C 109818~|~1~|~1~|~01/NHS~|~All work is included in this split.~|~04 - Reconstruction - No Added Capacity~|~41BE52B5FE8ECC1D6B1FFBB54DEAD322A451CBDD 119358~|~1~|~1~|~01/STR~|~Plan split for project to replace or line bridge size culvert CLI-72-0218. ~|~04 - Reconstruction - No Added Capacity~|~6420CDE99346F52C02933D2FE96782F21E3B9D6A 95435~|~1~|~2~|~02/IMS~|~8703574, 8703604, 8703698, 8703728, 8703965, 8704023, 8704112, 8704082~|~03 - Reconstruction - Added Capacity~|~85814223346060E0244EAEB6AB75ED3C6A087E73 95435~|~1~|~1~|~01/IMS~|~WOO-75 from SLM 11.18 to SLM 19.43~|~03 - Reconstruction - Added Capacity~|~E0F8615296FEABE9D9FE9FA6BF6511CC5D90F8F3 94394~|~1~|~1~|~01/NHS~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~9E7D2D8B106517DFE59FBF011B04E957B96E349A 94394~|~1~|~2~|~02/S<2~|~Concrete Pavement Repairs in ERI-SR-0113 in Milan~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F3AE2605EE64A35B76BF91979BA822E2A7AFD9E8 118908~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~B475D1384B02DD5458B0E90A664CDC1A91CC6EDA 101998~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4.~|~21 - Safety~|~453F3525284A99C191DB99A698D7DB4B78CDFADF 104067~|~1~|~1~|~01/S<2~|~Guardrail replacement project on various routes and sections in ATH Co. CEAO funded. Funded 100% federal.~|~21 - Safety~|~AF301D84922FC33CA2E0A00BF1E035552FE216A4 119001~|~1~|~1~|~01/BRF/STCE~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~CED2C3EAB1B307B15180C5B4500E056B3559A3DC 97790~|~1~|~1~|~01/NFP~|~100% State - Construction Project Inspection Task Order~|~17 - Construction Engineering~|~7E9EB9E71BB9F29C7C349C7EB177FEEA2EA7FD6B 96094~|~1~|~1~|~01/IMS~|~?01/IMS/BR/ " - District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP ? Deck replacement: SFN 3000907, GUE-70-02.81 carrying CR 143 over IR 70. Not BR Eligible for Rehabilitation: Length=288; SD/FO = (2); SR = 83.5; DSR = 7;~|~13 - Bridge Rehabilitation~|~CDD0E59B21DA113A5A75BF7983990AA7B5091C59 91580~|~1~|~1~|~01/STR~|~Deck Replacement. 7302614 SCI SR73 11.74 Intersect: Wolf Run80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~ABDF64A6EB0A8D9A80F039470C5AFFC5F6415B03 120779~|~1~|~1~|~01/S>2~|~Resurfacing work for Fairport Rd and Water St.~|~~|~CF4ED81811C134C6F7D2D8F098BFD277B0E0FC2A 119149~|~1~|~1~|~01/NHS~|~Resurfacing ATH-33-11.79-14.07, ATH-50-5.02-10.32, and ATH-32-0.00-1.40~|~05 - 4R Maintenance - Resurfacing~|~55180FEB27B163ADFD11A91EB12AFB28515A6E38 109561~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~5C2E52F186DDE03AC8EC70DC69550EBF61D26E6D 95407~|~1~|~1~|~01/NHS~|~Remove and replace LMC overlay, rebuild deck edges, reface abutments using anodes, patch pier caps, encase piers, rebuild wingwalls, and install polymer modified asphalt expansion joint system. SFN 1103245 Tributary of Anderson Creek, SFN 1103334 Russell Creek~|~13 - Bridge Rehabilitation~|~496158ADA464111C01DFD4B7D1B1E62593E3E38E 113553~|~1~|~1~|~01/BRF~|~CEAO funded Bridge Replacement~|~10 - Bridge Replacement~|~72F1AE59E1A53BD8A44136EA3E27B5D913343367 107299~|~1~|~1~|~01/NFP~|~Split for work on the interstate system.~|~99 - State Preventative Maintenance~|~3B014EBE0E2724DA5FC6E1126C721017EC296ECB 121331~|~1~|~1~|~01/NHS~|~FRA US 33 and FRA SR 16~|~05 - 4R Maintenance - Resurfacing~|~B8349CAA66A817EC0F19C09D74B0F1D264D789D1 121331~|~1~|~2~|~02/S>2~|~FRA SR 161~|~05 - 4R Maintenance - Resurfacing~|~9E9E43E820BCF2AFD6D8449AA7C9D7B86BE013C7 121331~|~1~|~3~|~03/S>2~|~Added CO CO Contr 03 funding event per 2024 MYWP Spreadsheet~|~17 - Construction Engineering~|~AE93FBB64D0C77929E05616F02CF4FC5F812B081 112841~|~1~|~1~|~01/S>2~|~Resurfacing of MAH SR 46 from 13.48 to 16.64~|~~|~A530AAD7DBF920D1397DEC5A4B0C860AF1E70139 112841~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~~|~8BAEF9968DA65AD8B789572A9413091C7B6D46D4 93443~|~1~|~1~|~01/STR~|~WOO SR 105 8.81-12.24 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~200970FD1E1AC337B7EBC2247D42CB177CDD6A2B 120107~|~1~|~1~|~01/NHS~|~All work included in this split. ~|~21 - Safety~|~486BEF55019DEB4EB5696AFBF54D091A32B5A471 105683~|~1~|~1~|~01/NHS~|~District Preservation - 4PF7(80%)/4PS7(20%) - No CAP - Replacement of extrusheet signs on FAI-33, MUS-16, LIC-79.~|~21 - Safety~|~84D9E4AFB6EF302C0D93B2DD85703D5640EFA3D8 105683~|~1~|~2~|~02/S<2~|~District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - 1) Installation of warning signs on CR 35 where it goes under IR 70/IR 77 interchange Bridges at GUE-CR 35-07.25 to 07.60; 2) Directional signage on Lic-SR 79 04.09 to 04.11~|~21 - Safety~|~62436326F5A26F8B355B3EBA8BEDDB5799E266BB 113257~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work.~|~05 - 4R Maintenance - Resurfacing~|~A95C79AD50B835A9CF94AED820993FDC9B5E8E32 109633~|~1~|~1~|~01/STR~|~Emergency repair on BRO 41 3.36.~|~17 - Construction Engineering~|~FB355F224F3A1D380598C1CAEA8CD52B01FDC208 126380~|~1~|~1~|~01/S>2~|~Resurfacing & curb repair~|~05 - 4R Maintenance - Resurfacing~|~998FDE519151D30F066EA0D66DE4049675DF7510 109488~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~6DAF01CB24721C33115D17B24F1EAF61A4B01248 122132~|~1~|~1~|~01/STR~|~Bridge repair project. Pile plating and encasement. GAL 233 1.66 (SFN 2703092).~|~13 - Bridge Rehabilitation~|~299C461146D0BE094C65B45C4406CD9D5624CE31 82632~|~1~|~1~|~01/NHS/NRdg~|~Major New Funds / Safety Funds / MPO (STP) / City of North Ridgeville - Added Capacity Items (85%)~|~03 - Reconstruction - Added Capacity~|~E8E5CCAB87FB55633B1B68CB674862B67766C6DC 82632~|~1~|~3~|~03/NHS/NRdg~|~100% City of North Ridgeville for non project eligible water and earthwork.~|~03 - Reconstruction - Added Capacity~|~ABE90EEC0DEC2FBB189B19D717344C2B733536ED 82632~|~1~|~6~|~06/BRF~|~Bridge Replacement on CR24 (Root Rd) due to roadway alignment adjustment~|~10 - Bridge Replacement~|~5014B35F4DD35668F22DE33EDBB0BD318A28CB85 82632~|~1~|~4~|~04/CMQ~|~Signal Work eligible for CMAQ funds.~|~03 - Reconstruction - Added Capacity~|~280AA39E52E2BB92827B12FBA7B5A51B130395E4 82632~|~1~|~8~|~08/NHS~|~$2,400 is to pay Consultant Inspection for activities under Plan Split 3/1~|~17 - Construction Engineering~|~F6720678F6D9EA3163A02E9600829959DFDB2DD8 82632~|~1~|~9~|~09/NHS~|~Ongoing Consultant Services during Construction~|~17 - Construction Engineering~|~6FEE03F1B0C45AC36A2513B7EE07913AA5A25A2B 82632~|~1~|~10~|~10/NHS~|~Ongoing consultant services during construction.~|~17 - Construction Engineering~|~FAF93E8EA6E7824248045865C4EF9ECE7E94962B 82632~|~1~|~11~|~11/NHS~|~Ongoing Consultant services during construction.~|~17 - Construction Engineering~|~2ABD4A98A1A5292494B808A6FAFD032A9E44AD57 82632~|~1~|~7~|~07/BRO~|~Bridge Replacement and widening at Str LOR-20-22.64~|~10 - Bridge Replacement~|~D7EDB887B62CA4267CC1C978D98932E0097D22A7 82632~|~1~|~5~|~05/ENH~|~Multi Use Path.~|~28 - Facilities for Pedestrians & Bicycles~|~D1A4D1E877A5EAEC613C2FBA6B12003C8792B256 82632~|~1~|~2~|~02/NHS/NRdg~|~Major New Funds / Safety Funds / MPO (STP) / City of North Ridgeville - No Added Capacity Items (15%)~|~04 - Reconstruction - No Added Capacity~|~CF80048A37DEA0D80C3925FF046BBAE83B94765D 82632~|~1~|~12~|~12/NHS~|~Ongoing Consultant Services during Construction~|~17 - Construction Engineering~|~90ACC2F863570537A3DDD10F252CA04955E54E39 82632~|~1~|~13~|~13/NHS~|~Consultant Inspection paid with District Funds~|~17 - Construction Engineering~|~DC1123CA06DA6C5FC89930E7F1F9CF552B2C3AEC 101740~|~1~|~2~|~02/S50~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~763850C28EEC32F76DBF8C33F3A74F4205AF8111 101740~|~1~|~1~|~01/STR~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~D065438C10D2227186592644DA557ADF36192376 122999~|~1~|~1~|~01/S50~|~All work included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~570366AA990F934592D36AAC02D023BD9B11D19E 103346~|~1~|~1~|~01/S<2~|~Removal of Bridge~|~13 - Bridge Rehabilitation~|~E207159ED0FCC45EBE46F6B9BF1E46CD21665FE2 77582~|~1~|~1~|~01/NHS~|~Preventive Maintenance Resurfacing80/20 Fed/State~|~05 - 4R Maintenance - Resurfacing~|~665917D5541DAB2F9D8C556EFA524C10A27274F9 102484~|~1~|~1~|~01/STR~|~Resurfacing of HOL-39 and TUS-39~|~05 - 4R Maintenance - Resurfacing~|~0AB5746C05286391A579091352F129D62B44D989 124383~|~1~|~1~|~01/MPO~|~Plan split for intersection improvements utilizing NOACA carbon reduction funding~|~04 - Reconstruction - No Added Capacity~|~554FD14E4E36ADDBC3AA883A85A7B95357D51441 117788~|~1~|~1~|~01/NFP~|~Reconstruction of the Rest Area Parking lot, sidewalks, ADA ramps and other miscellaneous items~|~44 - Other~|~4A0D07B2E31F8835FA9AB60F39FAE92F27D7CAD3 113611~|~1~|~2~|~02/SAF~|~Thermoplastic pavement marking upgrade. Safety Funded.~|~21 - Safety~|~762311500E5FBF0CBFF922C39B85A350B373855F 113611~|~1~|~1~|~01/STR~|~Pavement marking project. Rural other federal aid funded 80 federal/20 local.~|~21 - Safety~|~43F869F09028627751CB67939B8808CE9AA900DB 114857~|~1~|~1~|~01/NHS~|~Repair curb & gutter and improve the existing drainage.~|~04 - Reconstruction - No Added Capacity~|~66BEAAEFFAD6111BFF6212BF9E4959F6F4CC6FC7 110691~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~79FD99E84AF300F02015C8C73207935E9E0860A1 110691~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~EDDF83E2976372A4E96D07BAFD474B80E40AC266 97699~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 33 13.65-13.84. NHS route funded 80 federal/20 state.~|~17 - Construction Engineering~|~EE73866D666A9A1345E36B402203CF161C17D1CD 96432~|~1~|~1~|~01/NFP~|~100% state participation in the repair and resurface pavement surface of existing parkway roads and parking areas.~|~44 - Other~|~3C192AFE12318A54FA68CAF752618D361A1C8428 110711~|~1~|~1~|~01/NHS~|~Resurfacing ATB SR 11 from 13.94 to 22.16.~|~~|~7B1346B2B17193EE151F768A8A8B197A020258CD 110711~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~ACC9261EC4A0FFF84829A290A4F1FB6B4F61E545 127104~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~AA868B1FC01E40E4199E9CAE6006DE7B8C10E0CF 109152~|~1~|~1~|~01/NFP~|~All work for the project is in this plan split.~|~44 - Other~|~8217D374C136BDEDC54AB0CF85685DE469396A1C 111667~|~1~|~1~|~01/NHS~|~Culvert rehabs~|~04 - Reconstruction - No Added Capacity~|~6E67A3D0EC1D22F4DE90F939C35E7AB76991008D 121639~|~1~|~1~|~01/MPO/STOW~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~63D25AE92FB3A366FF2D322408F7712361DDCB42 93292~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - 4PF7 (80%)/4PS7 (20%) - No CAP - rehabilitation of rear abutment and drainage on LIC-79-13.79R (SFN 4504429).~|~13 - Bridge Rehabilitation~|~F2D6C7FE6F04E30677542248E6BCED4A9F55AAD6 93292~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge deck rehabilitation of SFN 4504747 carrying SR 79 over IR 70: BR Eligible: Length = 255; SD/FO=1; SR=78.0; DSR=4;~|~13 - Bridge Rehabilitation~|~E6402001A40930FD70E1C84C8C6B0CE9712E2314 93292~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Lic-SR 79-04.19 to 04.53 inside LA and classified IMS~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ED3DCCCF1D687AAB9F4267C150CAFE95B2E23030 125398~|~1~|~1~|~01/IMS~|~Resurfacing and related work on IR 70 in Licking and Muskingum Counties.~|~05 - 4R Maintenance - Resurfacing~|~36AFAD2F93EC3E81444296B029F13F5CC8F0F92D 121620~|~1~|~1~|~01/NFP~|~ODNR project to construct full depth flexible pavement for Appalachian Hills WLA road NR1 to proposed visitor center driveway. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~85972ABA1056D631A1FD270855FA0D6808889615 124387~|~1~|~1~|~01/NFA~|~Bridge rehabilitation of SFN 1602713.~|~13 - Bridge Rehabilitation~|~3598C1A2457FA98A92FC19FA286EB4148E6631D5 96981~|~1~|~1~|~01/IMS~|~Pavement markings on various routes in POR, STA and SUM counties.~|~21 - Safety~|~622A924F7F2AD4EBC15DA642819D31F602BCC248 112899~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~A94ABBADD409EFE82C5F4DAE37B29BBBE246C409 116922~|~1~|~1~|~01/S>2~|~Bridge Replacement~|~10 - Bridge Replacement~|~DE02E67B0C636F167F01FA61B20531FA45A34B96 123838~|~1~|~1~|~01/STR~|~Replacement of superstructure SFN 4202864 along SR 229 in Knox County.~|~10 - Bridge Replacement~|~7F1A281C455613CAE1BFF205379F71E56DC96C05 99043~|~1~|~1~|~01/S>2~|~Apply herbicides along roadsides for weed control on 4 lane roads~|~44 - Other~|~3511B52CF0E4185EA0DBA87820A154DB09A5F732 111593~|~1~|~1~|~01/NHS~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~3C043E68709BF0EE977574516ECFDD4C4352677C 113956~|~1~|~1~|~01/SAF~|~Pedestrian improvement project in the City of Marietta. Locations include: Butler Street, Putnam Street, 2nd, 3rd, 4th, Front Street, Washington Street and Marion Street. Work includes pavement markings, signs, RRFB's and signal timing.~|~21 - Safety~|~9DC37C53C17A49C76DDEED83A16AB8AA81661B85 114558~|~1~|~1~|~01/STR~|~AC Overlay without repairs.~|~17 - Construction Engineering~|~A4EC7E74BB5B876E44AF76B55680BC0F6A96E3B5 114558~|~1~|~2~|~02/S<2~|~AC Overlay without repairs.~|~17 - Construction Engineering~|~5FDF1790714BA2C890DAD8B4F28B7AF1423193A1 25261~|~1~|~2~|~02/S<2~|~Work on US 224 from the CSX RR at 11.44 to US 30 at 12.23. All funds from the District Preservation Program budget. No local funds. Work is inside the Van Wert Urban Area but outside of the City of Van Wert.~|~05 - 4R Maintenance - Resurfacing~|~3EB5F242EA588D08783F6305EDDE4F56A0AF047F 25261~|~1~|~3~|~03/NFP~|~Resurfacing the rest area ramps, and resurfacing the weigh station ramps and parking lot. Rest Area funds SAC 4BR7 from ODOT Central Office Facilities.~|~05 - 4R Maintenance - Resurfacing~|~521E17B5741061ECEE320F5803E37BF70B34064D 25261~|~1~|~1~|~01/NHS~|~Work on US 30 which is an NHS route from 4.07 to 11.25. All funds from the District Preservation Program budget. No local funds. The SAC 7BPB bond funds are to be used before the other funds.~|~05 - 4R Maintenance - Resurfacing~|~4972D62604AC6FA31B2D52B40742D14538570184 122580~|~1~|~1~|~01/BRF/SUCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~3451F2F950AB4B5728CB3E1476A3AA7C831B1741 88932~|~1~|~1~|~01/S>2~|~US422 18.97-21.16~|~05 - 4R Maintenance - Resurfacing~|~0ADDF024E11E8838E6003CD80DAF369A8F36C4E2 88932~|~1~|~2~|~02/S>2~|~not BR Eligible: SFN 7807155 US422 19.94 over squaw creek. SFN 7807228 US422 20.02 over squaw creek.~|~13 - Bridge Rehabilitation~|~D14ED307059DE3966B5C24A5763FC87884E21763 88932~|~1~|~3~|~03/S>2/GIRA~|~100% Local items under Urban Paving policy.~|~05 - 4R Maintenance - Resurfacing~|~CD6E4303B8A92FBCC1267607793E3DB624872408 115134~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D04D110D0CD1C2C357731E904D7859AAB2141CDE 81481~|~1~|~1~|~01/STR~|~Rehabilitate bridge WAR-132-0553 (SFN 8304920). Replace deck.~|~13 - Bridge Rehabilitation~|~1EF566E6834AB73F343CB83159DCC1D05154F184 112837~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span.~|~~|~D4CAA353670382D06F1588708F39D0FC0D9EE8FB 112837~|~1~|~3~|~03/STR~|~Minor bridge rehab 10' to 20' span.~|~~|~83FE65837B433706B5054EE068C3F9A83B0506BE 112837~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~4CF3D033728BED439D4ACA46A7E8BAE2296CEC13 97004~|~1~|~1~|~01/STR~|~Spot Paving locations throughout District 11.~|~05 - 4R Maintenance - Resurfacing~|~22C4E3C449D0B3DA8F6E55AD368FEC9CF6E2DAE1 105777~|~1~|~1~|~01/BRO~|~Plan split for bridge rehab~|~13 - Bridge Rehabilitation~|~68B19AD909E73FEB9E957938C9369956E00DB031 105777~|~1~|~2~|~02/NFP~|~Split for 100% local work~|~13 - Bridge Rehabilitation~|~DA5A4AEE1756F48B02FB365616C117CA7EFB34F5 112797~|~1~|~1~|~01/CMQ~|~Intersection improvement at Valley View Rd and Olde Eight Rd.~|~~|~6BEF1F7BC1A35EB720DAB7320AA45EA25C4668FA 106726~|~1~|~1~|~01/S>2~|~Resurfacing city streets with Large City Funds~|~05 - 4R Maintenance - Resurfacing~|~5302683655B8D0F543FEF558FAD141AFCF3C49ED 125181~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment~|~21 - Safety~|~C130E9E5335425F7F4ED92841C7BE7E9EB2D68F8 115753~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the large urban portions. ~|~~|~B4D86529F4C72B03B44540E36C536DFA6FE03CA7 115753~|~1~|~2~|~02/S>2/LEB~|~Plan Split for the 100% City items on the urban paving project. This also includes the tiny rural section~|~~|~5AAF1AD602D75319C7874BE6727B5E462FD54960 79764~|~1~|~2~|~02/NHS~|~Preventive Maintenance Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~009E37642AD5DE1D42B40F6A5A37D03E3BFE4907 79764~|~1~|~1~|~01/NHS~|~Preventive Maintenance Resurfacing - NHS~|~05 - 4R Maintenance - Resurfacing~|~6507216FAB7EEC5B369F6C7D876692E1C9790166 109823~|~1~|~1~|~01/NFA~|~BRO 286 0.00-8.31BRO 774 0.00-3.04BRO 763 0.35-4.44~|~05 - 4R Maintenance - Resurfacing~|~30765000F8E4673455343A8B50C3928DDD6095B1 109823~|~1~|~2~|~02/S<2~|~BRO 763 0.00-0.35~|~17 - Construction Engineering~|~C54D1D612AE7995D4B96331F285830E61AB08A01 84454~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 2800152~|~13 - Bridge Rehabilitation~|~F25B49E1D6ED74C0E19D363E37E5844850949A1F 114582~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 146 16.35. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0EC65DBECEBD5E50897F34BCB36F2724B98A0B23 123798~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~E6E9616D27D1F9004BF6E9E90D6058EF4184AF22 104807~|~1~|~1~|~01/SAF~|~Install LED stop signs on Chapel Road at the intersection with SR-132.~|~21 - Safety~|~9608D97A586391DC1E375F970436FD424F23843B 104807~|~1~|~2~|~02/SAF~|~Install 2 solar powered flashing beacons on the intersection warning signs in each direction (4 total) at the intersection of SR-132 & Chapel Rd.~|~21 - Safety~|~03E27E9D7184C52D5AB1B17A2C2AED4DB325179E 13184~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all bridge work in Part 1.~|~10 - Bridge Replacement~|~D0CFEA855A061C8A1B1D050D5C09895741955F54 13184~|~1~|~2~|~02/S>2~|~Plan split to install roller supports for the gas line in Part 1.~|~10 - Bridge Replacement~|~3125EEE9C4ADA222A4E3B14692BB016640B4C45F 13184~|~2~|~3~|~03/S>2~|~80/20 fed/state funding split for all bridge work in Part 2.~|~10 - Bridge Replacement~|~AD977246438BE1351CF2DBC04509FFBFC8E7ECF9 13184~|~2~|~4~|~04/S>2~|~Plan split to install roller supports for the gas line in Part 2.~|~10 - Bridge Replacement~|~4861BF8007DBB51D86E57CD607483A795BF04B37 91338~|~1~|~1~|~01/STR~|~Two Lane resurfacing between SLM 0.00 to 5.940~|~05 - 4R Maintenance - Resurfacing~|~FEEB6EECDC645863FC962ADB0531C9E4A0096295 113898~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~27BB885502E20C06A5C69FDCDFDF7C2C932ADE56 88085~|~1~|~1~|~01/IMS~|~4807383 LUC IR475 4.33 Intersect: Wolf Creek 4807413 LUC IR475 4.33 Intersect: Wolf Creek~|~~|~CC75E9C587FF82EFBE37959B9448C43DF4BB9A6D 99859~|~1~|~1~|~01/NHS~|~Paint existing steel superstructure and seal necessary concrete surfaces.~|~13 - Bridge Rehabilitation~|~335E6A404C5FCB3A7155A6C9DA21C1D001BCE6C1 99859~|~1~|~2~|~02/IMS~|~Paint existing steel superstructure and seal necessary concrete surfaces.~|~13 - Bridge Rehabilitation~|~5522BB3521FB10BBE65527A9DBE426535D0D320C 123723~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work on IR-271 express lanes, no added capacity~|~05 - 4R Maintenance - Resurfacing~|~15DDA56958EB9751EC7058C8FBD224362928CD72 105297~|~1~|~1~|~01/STR~|~Herbicidal Spraying in BEL, HAS, and JEF~|~44 - Other~|~AE0F937259F984A315591221A7A317D8547ED6CD 88956~|~1~|~3~|~03/IMS~|~Paving of Ramps D, C, G and F at I-77 interchange. Cost TBD.~|~05 - 4R Maintenance - Resurfacing~|~58E2097A63050202641AE14DB10EFBB9B2BB2802 88956~|~1~|~1~|~01/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~724A9DC5A2136E5F31FD39A909695D4CF2D176B0 88956~|~1~|~2~|~02/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~79EA11D91C6E44A71BBC3D125D4FC57889DB28C0 97212~|~1~|~1~|~01/IMS~|~Construction Funding to regrade slope above I-74~|~44 - Other~|~F883B180BCB49ED8E2C5202FA239FD09EAD9BD56 84579~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 33 14.25-16.27 and ATH 50 14.14-17.50. NHS route funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~9D2F2B0247EB9CBDF920AA0EA4FF5233E192ADC2 120293~|~1~|~1~|~01/NFA~|~Install box culvert and roadway rehab on Germantown Rd and CR 250 in Noble County.~|~04 - Reconstruction - No Added Capacity~|~4F03EFAEBEF141F9A922DFDCF1B303E039A8EF3C 124460~|~1~|~1~|~01/NFP~|~Created for J&C TID involvement~|~44 - Other~|~6B336D4A363AC7D0236A7274E451178A86BDC746 115168~|~1~|~1~|~01/NHS~|~AC Overlay w/Rpr ERI SR 02 00.00 TO 7.772~|~05 - 4R Maintenance - Resurfacing~|~6360D5D8E9FEE6316290E9788BBBEEBB7E62772F 80695~|~1~|~1~|~01/NHS~|~4807286 LUC IR80 10.03 Intersect: Ir475Nb & Us23 Mp0584 4807294 LUC IR80 10.02 Intersect: Ir475Sb & Us23 Mp0584~|~13 - Bridge Rehabilitation~|~35C11122F01B9A9459638A05E2BB9A22A876853D 80695~|~1~|~2~|~02/IMS~|~4807286 LUC IR80 10.03 Intersect: Ir475Nb & Us23 Mp0584 4807294 LUC IR80 10.02 Intersect: Ir475Sb & Us23 Mp0584~|~17 - Construction Engineering~|~C003AC2C286D53B2E921F36C509C935B20F0FB34 100068~|~1~|~1~|~01/STR~|~LAW 243 10.40 Slide Repair~|~44 - Other~|~151F2F6D08EC85C9FABB5DE822148BEEFDE9649D 94806~|~1~|~1~|~01/S<2~|~Shave and pave roadway. ADA intersection improvements. SLM 1.38 to SLM 2.13~|~05 - 4R Maintenance - Resurfacing~|~BEAED5E2F1E6D8E90DCCC6BA2B22CE426C58C5E1 109614~|~1~|~1~|~01/STR~|~Replacement and rehabilitation of culverts within District 5~|~04 - Reconstruction - No Added Capacity~|~CEC56BDD1EC32A8FF831E492452C7D9CA2D940A6 97960~|~1~|~2~|~02/STR~|~SR 47 SLM 0.87 to SLM 10.07 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in).~|~05 - 4R Maintenance - Resurfacing~|~4B895CC4B1B6079EA26AF11605376F951ACEED87 97960~|~1~|~1~|~01/S<2~|~SR 47 SLM 0.79 to 0.87 (OC 800) - resurface the existing roadway with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~BBB8223BB3AF132897F25937DABB66CE3761D099 93677~|~1~|~1~|~01/STR~|~A culvert replacement at SEN-100 near TR44 Baker. No SFN.~|~04 - Reconstruction - No Added Capacity~|~E2FC8E904C060049705E21FFABDA8A6074DA628E 116605~|~1~|~1~|~01/NFP~|~Culvert Project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0CA01D2FF11C84F3E3808271473B9AF7F60AC327 107521~|~1~|~1~|~01/STR~|~Plan split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~0B9D0A63311F4BC30B5B328CDC0EA7F553438213 126608~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EA0872C2880C75B59AFDC5B160051D5D2F103155 120991~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 149 over abandoned railroad.~|~04 - Reconstruction - No Added Capacity~|~2BC51F421763F0FE7A510F78950AA090012EFFB5 122343~|~1~|~1~|~01/MPO~|~Plan split for eligible repair and resurfacing work on Van Aken Blvd.~|~05 - 4R Maintenance - Resurfacing~|~A455F67441420C907DFC4C2C962245E94F8412B4 88525~|~1~|~2~|~02/NHS~|~Structure at LUC-2-8.43~|~13 - Bridge Rehabilitation~|~8E5C43D96FE71D176B506BA013E3496CFD86E0A2 88525~|~1~|~1~|~01/NHS~|~Resurface LUC SR2 2.23-5.45~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D311BC6BE6F655589DC95EC1358C90D2365B940F 114436~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~554E101A71BAFEB00100736029B24F70C4C1D7B3 115948~|~1~|~1~|~01/MPO~|~Resurface Tremainsville Road from Laskey Road to Alexis Road.~|~05 - 4R Maintenance - Resurfacing~|~951A592C92B6135BF175EF578A08B54872C92E86 95806~|~1~|~1~|~01/STR~|~STP Rural, HAS-799-5.08 and various other sites for culvert repair/replacement.~|~04 - Reconstruction - No Added Capacity~|~7002D3A7EFBC283FA68BE4A07B17E075D3D85B1C 122313~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 646 over Salem Creek. ~|~04 - Reconstruction - No Added Capacity~|~6590AE77343486B66B0922F6B144095A02B967F3 94070~|~1~|~1~|~01/NHS~|~Interchange highway lighting replacement project using 80/20 split of 4PF7/4PS7 sac at JEF-7-24.09 (Franklin Avenue) and JEF-7-26.02 (Alexander St. aka 4th Street).~|~21 - Safety~|~4C0A4461BB28320E4BC6674BCA15A7ABBFE30228 105928~|~1~|~1~|~01/SAE/MCEO~|~"01/SAE/OT/MCEO" - Muskingum County Engineer guardrail upgrade project funded by CEAO with a federal max of $300,000~|~21 - Safety~|~3107971B19A26412BC57E9F4BD9EBECA11D6749C 78249~|~1~|~1~|~01/NHS~|~priority system minor rehab. of COL-7-3.55 to 5.20; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~6BF75FD4211470B3D55A8FA9A2921363EC55C8A3 125788~|~1~|~1~|~01/CMQ/TWIN~|~Citywide signal upgrades/replacements.~|~21 - Safety~|~29B506925BE451B374CE73CAA56C7DF09A099E4A 119791~|~1~|~1~|~01/NFA~|~Created for J&C involvement. ~|~44 - Other~|~1C47681D24A80218FBB479D6B97B5DD975369AB1 98620~|~1~|~1~|~01/NFP~|~100% State on work items eligible for turnpike mitigation~|~44 - Other~|~5C97BD61B2F04C5C278241ABD428DA218E2EF299 104686~|~1~|~1~|~01/NFA~|~ROS CR VAR PM FY22~|~21 - Safety~|~6AC923B525B405E9DCC935ACC1152783A0680597 107104~|~1~|~1~|~01/NHS~|~plans split~|~44 - Other~|~07315DABB80188687A9DA2D3DECC52A3D720E800 91145~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement contract for FY 2015. ATH 13 4.00-4.52 NHS route funded Federal 80%/State 20%.~|~21 - Safety~|~736646F2B5021F1BD74C7D1F579B9A2F03925AB0 91145~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement contract for FY 2015. ATH 13 4.52-4.94 and ATH 682 6.80-7.10. Urban other federal aid funded Federal 80%/State 20%.~|~21 - Safety~|~B0AA9C85484A652FD8673C5354921BA0F28E87DA 91145~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement contract for FY 2015. MOE 255 17.40-18.00. Not on any federal aid system funded Federal 100% State.~|~21 - Safety~|~C72DFE02D949595BC3ED49E07D8AB415813ABC0B 91145~|~1~|~3~|~03/STR~|~Guardrail upgrade/replacement contract for FY 2015. ATH 13 4.94-10.07, ATH 550 3.90-17.80, GAL 160 8.00-20.00, MRG 78 2.00-37.15, NOB 78 0.00-4.75, and VIN 160 8.00-9.00. Rural other federal aid funded Federal 80%/State 20%.~|~21 - Safety~|~D89E63190B624DCFDE236A8D52B4B03BB779F001 112904~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~600FC0C36B32CC314AE54B6C4F1D64C14E63A10B 108870~|~1~|~1~|~01/NFA~|~township route 807 & 808, sib loan~|~04 - Reconstruction - No Added Capacity~|~A10CE02D671C7EE08CDB33B4DE8DA5F9F9E3FC5C 83043~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation Funding - No CAP's - Crack sealing on Mus-SR 208-01.03 to 11.05; Per-SR 204-00.00 to 10.06~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~23915F77C3ACA4FCC19940090FB7B5A94C90D96E 83043~|~1~|~5~|~05/S>2~|~"05/S>2/PV/ " - District Preservation Funding - No CAP's - Crack Sealing - Fai-SR 256-06.10 to 06.54~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~38DF7149680545826507AB3C205A8912F1C0C0CE 83043~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation Funding - No CAP's - Crack Sealing - Fai-SR 188-16.02 to 19.06; Mus-US 22-04.50 to 09.17~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~579E8C4B9E8E4E61F64058E2054E68611CC64834 83043~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation-No CAP - Crack sealing - Mus-IR 70-05.56-10.06~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C6267CC9261D12D9F28514657C0547F638939C05 83043~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation Funding - No CAP - Crack Sealing - Fai-SR 158-19.06 to 26.53; Fai-Sr 256-06.54 to 12.13; Fai-SR 664-07.47 to 12.62; Per-SR 93-00.00 to 11.58; Per-SR 13-19.83 to 26.88~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C701DD6A63D8CABAE80617F69A2ECC89F38D1A91 125559~|~1~|~1~|~01/BRF~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~4CD3C7833B1468F0841AED1EBF7B1B3295948ABD 93784~|~1~|~1~|~01/STR~|~Replace SFN 3601560 Located 1.66 miles west of Hillsboro on SR73 It is proposed to replace the deficient structure. 80/20 Split01/STP/BR/State~|~10 - Bridge Replacement~|~7CD7AD2F863C1436FAAE25D44C85A4F4713D9C5C 126373~|~1~|~1~|~01/S>2~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~AD89FC9FBC4440D1CB77D5DE485A726DBBEBF16D 126373~|~1~|~2~|~02/STR~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~B9F02BDEBCA609D56941DDE5DC5F30CF1394CFB9 107946~|~1~|~1~|~01/SAF~|~plan split~|~44 - Other~|~F8C0280FF35D7727CA2D89CF7DAFA0B4BCEE38D4 107480~|~1~|~1~|~01/CMQ~|~Plan Split~|~28 - Facilities for Pedestrians & Bicycles~|~BBB47C6192D33C4C697153E3CBEB8701B1BF3B78 124291~|~1~|~1~|~01/NFA~|~Restore rail station building and provide pedestrian facilities ~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~9289201E4708207AA322F91A124EE7CB19F74340 98551~|~1~|~1~|~01/SAF~|~Upgrade traffic signal to enable implementation of safety countermeasures at the Intersection of State Route 47 and Fourth Street~|~21 - Safety~|~B80C1F644EB4A9D1B3BBE43444BC7CBE2F26DB6C 116590~|~1~|~2~|~02/STR~|~Resurfacing on SR 65 in Allen and Putnam County outside the Lima Urban Area. Rural STP. District Preservation Program funds. No local funds. ~|~05 - 4R Maintenance - Resurfacing~|~D0968B43199477B79D20A39302BC64600FD5C4BA 116590~|~1~|~1~|~01/S50~|~Resurfacing on SR 65 in the Lima Urban Area but outside of the City of Lima (SLM 11.24 to 13.91). District Preservation Program funds. No local funds. ~|~05 - 4R Maintenance - Resurfacing~|~D08655BBE0A28FCB0CEBE3CBFDB377089387AB8C 95841~|~1~|~1~|~01/S<2~|~Cut back all four corners of intersection and install new traffic signal at the Intersection of Stanely Avenue and Webster Street.~|~~|~706C92EA2C617023E97447FAAD1A324A77E0E8AC 103996~|~1~|~1~|~01/NFA~|~Rehab Wabash Road Bridge~|~13 - Bridge Rehabilitation~|~8CB951F4AAA5E036349E919D8D0DD528A8BFBBF6 105474~|~1~|~1~|~01/STR~|~SR 107 slm 0.00 to 7.08.~|~05 - 4R Maintenance - Resurfacing~|~179A5623FCEA6D2033ECE67672FC6BB30D0DFEF2 105474~|~1~|~2~|~02/STR~|~Bridge split~|~13 - Bridge Rehabilitation~|~AEEB811FBC20AEFB3C96C2BB65544B9F9D7FE143 105474~|~2~|~3~|~03/NHS~|~Part 2 Plan Split - Wil 20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A43DC2825D2CAED2E897D47D11E8F1C2B1665C3A 100682~|~1~|~1~|~01/STR~|~Chip sealing TUS-516 from SLM 3.70 to TR 207 (SLM 7.05).~|~05 - 4R Maintenance - Resurfacing~|~892D32C571320C4C1BA1427C8A82CD8B644D0C5F 100682~|~1~|~2~|~02/S<2~|~Chip sealing TUS-516 from TR 207 to TR 1344.~|~05 - 4R Maintenance - Resurfacing~|~44049FB3CE1B3D68D030849A2AE6320E9217B13B 100682~|~1~|~3~|~03/NFA~|~Chip sealing TUS-751 from the COS Co. Line to the Stone Creek Corp.~|~05 - 4R Maintenance - Resurfacing~|~5E71823572D8990D61271ECE3414FB779421C155 119416~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~5E56EECC1C5EDCE0E9D46153AEDA739298874462 93894~|~1~|~1~|~01/BRF~|~Bridge replacement of structure over Kale Creek, in Portage County, Ohio.~|~10 - Bridge Replacement~|~012CF6ED832DEF9CBE8E5D9BCD715F70A9632E85 110155~|~1~|~1~|~01/S>2~|~Bridge repair~|~13 - Bridge Rehabilitation~|~C5B19A989D92E32B6D70504C6E2AD13A2CE6CF2F 110155~|~1~|~2~|~02/IMS~|~Bridge repair - bridge under 20'~|~04 - Reconstruction - No Added Capacity~|~BB5B626102C7A355C35016CA20564D24B6E96948 110155~|~1~|~3~|~03/IMS~|~Bridge repair - bridge over 20'~|~13 - Bridge Rehabilitation~|~052249C8E9F1134CEA533FA7F1300E2217413C41 96202~|~1~|~1~|~01/NFA~|~Application of 1.5 inches of asphalt overlay, installation of a 3 inch topsoil berm against new pavement with seed, fertilizer, and mulch, application of thermoplastic pavement markings with silica sand for skid resistance, and full depth pavement repairs where needed.~|~~|~6C815AA1D2586794E6ED14B50AF71AA0BB1EE4A5 98289~|~1~|~1~|~01/IMS~|~Bridge rehabilitation along IR 70 near IR 77 interchange.~|~13 - Bridge Rehabilitation~|~4714F71DD4FDA01F0202AC0BB5F1DE8E14029591 113668~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 22.52. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2CCEC52E07B2AFFF3AEC171194D07129E1FCAB6C 107074~|~1~|~1~|~01/NFA~|~HIG CR Various PM~|~21 - Safety~|~E3D396EBAD020175C32334B7D957E6A50BF288FA 107743~|~1~|~1~|~01/NHS~|~LUC-2-3.501~|~44 - Other~|~78E846089A8B66F1082767D17241162DCD1E9634 99721~|~1~|~1~|~01/MPO~|~New Sidewalk on Canton Road (west side) from Sanitarium Rd to 500' south of Springfield Lake Drive.~|~~|~54D91B0ACD329F0ADB4900B14FC69330B0F1C37F 108177~|~1~|~1~|~01/IMS~|~ER Repair - repair landslide.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4CB193C8D63BF6CA38823011A0C46F9C038EB1E1 94368~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds SAC 4PS7.~|~21 - Safety~|~1D916B163A2E0D2F8C3A865179FB9DE0A132558E 122229~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-90-B~|~~|~7BA79F715E06CF1DCA8FE1F7AAD2141C0A2F48D9 102398~|~1~|~2~|~02/NFA~|~SR 60 2.97 to 3.31: 1" 424 FGP SR 60 3.31 to 3.76: Asphalt 2" mill and fill without repairs~|~05 - 4R Maintenance - Resurfacing~|~BD6659180D89ACF832C0ACA3C36A33F6B4352622 102398~|~1~|~1~|~01/STR~|~SR 39 5.72 to 6.73 and 11.44 to 17.38: 1" 424 FGP SR 60 0.00 to 2.97: 1" 424 FGP SR 60 3.76 to 4.20: Asphalt 2" mill and fill: SR 83 9.02 to 10.27~|~05 - 4R Maintenance - Resurfacing~|~C6BF0C335F91C6CFF66580343CADBBF9DE8AF987 101115~|~1~|~1~|~01/STR~|~Chip seal on rural routes: LOG SR 273 SLM 12.89 to 13.49AUG SR 219 SLM 4.11 to 6.01CHP SR 559 SLM 7.89 to 11838MIA SR 718 SLM 0.00 to 3.26AUG SR 219 SLM 0.00 to 1.09AUG SR 67 SLM 8.25 to 13.48AUG SR 67 SLM 14.43 to 18.94CLA SR 41 SLM 0.00 to 3.63~|~05 - 4R Maintenance - Resurfacing~|~78643D07DA7A5F4A831CF7959E00AD540D4FE550 101115~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal Aid routes: LOG SR 273 SLM 9.91 to 12.89LOG SR 559 SLM 0.00 to 4.02LOG SR 638 SLM 0.00 to 3.99~|~05 - 4R Maintenance - Resurfacing~|~9D5F3BE92CCB6E9D73054A7EA811A099E7733F98 115166~|~1~|~1~|~01/IMS~|~All work associated to the rehabilitation of bridge CLI-71-1237 and GRE-71-0150~|~13 - Bridge Rehabilitation~|~766868B6D420479DB6CCC1159D7D6F9A0CB7B21D 103678~|~1~|~1~|~01/SAE~|~Replacement of Type A assemblies on Interstate and NHS Routes throughout District 4.~|~21 - Safety~|~C3296C24C9FD15055C14B64F0D6DEF9C6B7F4DAA 105953~|~1~|~1~|~01/STR~|~Emergency slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1FF7FAD92BE7BA02A0097035600B52D8F05C0C86 124440~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~528392254533F2346102C18B33D3688D835DED23 113455~|~1~|~1~|~01/BRF~|~Sanctuary Road Bridge replacement work.~|~10 - Bridge Replacement~|~00170DAEF42843A02A2CAFDF464A27658410058E 126602~|~1~|~1~|~01/MPO/NILE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2A88201D410AACCCDFB9D93A297047BADAD33955 124532~|~1~|~1~|~01/NHS~|~Reconstruct roadway~|~04 - Reconstruction - No Added Capacity~|~8226EFA4A9EE433514A4F3A75C947B88F643AA49 87243~|~1~|~2~|~02/S<2~|~LAW SR650 Resurfacing Urban Area portion: 0.10 - 0.3080/20 split ~|~05 - 4R Maintenance - Resurfacing~|~2862649210460C950D76FF0374DE34CCB3A89F9B 87243~|~1~|~1~|~01/STR~|~LAW SR650 ResurfacingRural Portion: 0.30 - 4.43Pave thru Bridges:4404149 LAW SR650 0.9 Intersect: Osbornes Run 4404173 LAW SR650 0.93 Intersect: Osbornes Run 4404211 LAW SR650 1.84 Intersect: Osburns Run Creek 4404246 LAW SR650 2.12 Intersect: Osbornes Run 80.20 split 80/20 split~|~05 - 4R Maintenance - Resurfacing~|~30D31DE3C978961441EA02961466863354E92DC9 87243~|~1~|~4~|~04/NFA~|~LAW SR650 0.00-9.28 Resurfacing Brdg Rehab: 4404297 LAW SR650 7.08 Intersect: Little Pine Creek 4404335 LAW SR650 9.02 Intersect: Pine Creek 100% state ~|~13 - Bridge Rehabilitation~|~D9FB98FD24E88DFB90E3C870FA48C1C7C99F3FB5 87243~|~1~|~3~|~03/NFA~|~LAW SR650 Resurfacing Non Fed Aid Portion: 4.43 - 9.28Brdg Pave Thru: 4404254 LAW SR650 4.77 Intersect: Kelly'S Mill Branch 100% state~|~05 - 4R Maintenance - Resurfacing~|~F3869137531A0011BB5C2CBC92FA93961022B61D 101933~|~1~|~1~|~01/ENH~|~Multi-use path on Burbank and Beale from Highland to Larwill.~|~28 - Facilities for Pedestrians & Bicycles~|~11E42B5ADF01C46F3748EE894C6A89390EC41292 124721~|~1~|~1~|~01/SAF~|~Install new/upgrade existing pavement markings on various county roads in Clinton County.~|~21 - Safety~|~485EB9F481C41B4581E862CED836456DDF77DA23 88374~|~1~|~1~|~01/S<2/PATA~|~"01/<2/OT/PATA" - City of Pataskala SRTS Sidewalk project - CAP SRTS Federal (4SC7) $433,500.00~|~28 - Facilities for Pedestrians & Bicycles~|~16590480D68D85EDB60F49525DE1A44BCE619718 122164~|~1~|~1~|~01/NFA~|~Split 1 for project PID 122164~|~01 - New Construction~|~5933A6A81A25D3B391010F555E551A0ACF85151B 98002~|~1~|~1~|~01/NHS~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on NHS portions of US 62~|~05 - 4R Maintenance - Resurfacing~|~837B267CF3BDE7FC6FAA31EE52AC54D3778CC5E5 98002~|~1~|~2~|~02/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on OFAH-Rural portions of 1 US 62~|~05 - 4R Maintenance - Resurfacing~|~B4863E1D2CF0875367BF9B756CC5F212F9A2FCCD 98002~|~1~|~3~|~03/NHS~|~District Bridge Preservation Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP - Bridge work on NHS portions of LIC-62~|~13 - Bridge Rehabilitation~|~0654FB21CD0CD08649113C232123480FC3DA5728 98002~|~1~|~4~|~04/STR~|~District Bridge Preservation Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP Bridge work on STP-Rural portions on LIC-62~|~13 - Bridge Rehabilitation~|~7F2CC2DEAC491A7111B9FABB91C39FFFA1A30375 110680~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span.~|~47 - Bridge Preventive Maintenance~|~C03C31A3F83A024E6C438F0D8A472EBDB85AA675 110680~|~1~|~4~|~04/STR~|~Minor bridge rehab > 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~44155983D4DA73A627A989CB9E6C87C157FD9E81 110680~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~BC7C6A5D5063C4C620464E5177BF91ADEB95C0AE 110680~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~101087664A5C7A4372DA7F80AF9398C3F135FD29 77268~|~1~|~1~|~01/IMS~|~Widen IR-76 to six lanes from Barber Road to State Street, Summit County, Ohio. ~|~~|~CA07D30D6ECFA2A70B1BC33663713329CF95E310 104831~|~1~|~1~|~01/S>2~|~Reconstruct and resurfacing on local road in the City of Springfield.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D9CA57074BDC18B126E1CCA368B322EE03D50C9E 102040~|~1~|~1~|~01/STR~|~Slide repair on ADA SR 247 7.78.~|~44 - Other~|~8099BDAD2FA76E1AC6B2185D014A5346184A7865 126895~|~1~|~1~|~01/ERD~|~New plan split for Earmark (SAC 4R47) funds.~|~04 - Reconstruction - No Added Capacity~|~0E0083BC2117230E71D9481E8389D5EFFB8DCD31 86895~|~1~|~2~|~02/SAE~|~Construction of railroad signal preemption interface panel, cable, and battery backup for the Kemper Road and Reading Road intersection.~|~22 - Rail/Highway crossing~|~94DDC36E7C1F3A79A2CB00862128C09F60835AA1 86895~|~1~|~1~|~01/MPO~|~Reading Road: from Kemper Road to Crescentville Road; Hauck Road: from Reading Road to 700 ft. east of Reading Road OKI Improvements to Reading Road consist of the addition of a two-way left turn lane through the majority of the corridor; also left and right turn lane addition and signal replacement to improve LOS at the intersection of Reading Road and Hauck Road. In addition, an existing railroad bridge over Reading Road will be removed, an existing curve will be realigned to improve safety, and a shared use bikepath on the west side of Reading Road will be constructed. Improvements on Hauck Road inlcude widening for the addition of a left-turn lane from westbound Hauck Road at Reading Road.~|~21 - Safety~|~DFF09705F453EB999A669F05BEE68E70D124BCBB 82822~|~1~|~2~|~02/STR~|~Culvert Replacement - District Allocation~|~44 - Other~|~2B9098C4B08BCDCEB977EB21F1CB4DCF36336722 82822~|~1~|~1~|~01/STR~|~Geotech Funds - slip repairs several locations~|~44 - Other~|~3781E180D8F63281D8FB0073A32D2EA9CEAB1122 116773~|~1~|~1~|~01/NHS~|~ASD US 0250 22.09 & 22.57~|~04 - Reconstruction - No Added Capacity~|~5102196F69A682F465039E8B75ED9320966D555C 124326~|~1~|~1~|~01/NFP~|~Construct a new parking lot.~|~28 - Facilities for Pedestrians & Bicycles~|~28AD2BF549F8A9C83740D7F2BF3AC8F308A54056 124326~|~1~|~2~|~02/NFP/PARK~|~Trail work along edge of parking lot.~|~28 - Facilities for Pedestrians & Bicycles~|~CE3F9F001F682163491CE53C931756368BAD0AD3 106784~|~1~|~2~|~02/NFP~|~Work to repair/resurface Prospect Avenue from E. 22nd to Carnegie Ave that is not eligible for federal-aid.~|~17 - Construction Engineering~|~E597D14D970BF87EF75C54053DF6B56D1BEAB1A9 106784~|~1~|~1~|~01/NHS~|~Work to repair/resurface Prospect Avenue from E. 22nd to Carnegie Ave that is eligible for federal-aid.~|~05 - 4R Maintenance - Resurfacing~|~7048A2F0B23D8BA6F2416A9DC22C119AEA6276DC 109421~|~1~|~1~|~01/SAE~|~Guardrail upgrade/repair work eligible for federal-aid~|~21 - Safety~|~4A8CE1EF095BF1E9A11AF7B1AE79CEB5A56FDFC0 85508~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~BFB3A95529B370DB962DFC838EFB3D8064487FAF 98914~|~1~|~1~|~01/NFA~|~Resurface various couty roads with a chip seal treatment. Routes include CR 68 0.00-5.78, CR 76 1.69-4.47, CR 72 1.14-2.13, CR 84 2.47-2.69, CR 74 0.00-0.35. Not on any federal aid system funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~781A369F390B67C27FA9496875F722C62C13A187 98914~|~1~|~2~|~02/NFA~|~Replacement of a 31 foot bridge over Camp Creek on GAL CR 68 0357, SFN 2737361. Not on any federal aid system funded 80 federal/20 local.~|~10 - Bridge Replacement~|~2BDA6A4F016EB79F7D04FB7F1A4E60F2B3E7BA0C 124773~|~1~|~1~|~01/S50~|~Small City Program Funding for SR 61 reconstruction project (FY2030) with Reservoir of FY 2029~|~04 - Reconstruction - No Added Capacity~|~41089B66205E118BE1C07F561C536B3EF42DCAEA 118683~|~1~|~1~|~01/S50/NEWA~|~Resurfacing plan split~|~17 - Construction Engineering~|~EF3B005C5FD9CBDC8E7FCA03CE98C5360F68A7C6 110612~|~1~|~1~|~01/MPO~|~Construction of a sidewalk on the south side of Franklin Street (SR 725) from just west of Little Sugarcreek Road to just west of West Street.~|~28 - Facilities for Pedestrians & Bicycles~|~7B4F177DB943648FC1DFE8D93C05F41F81C517FB 110612~|~1~|~2~|~02/S>2~|~Plan split for the patching of the GRE-725-0193 bridge abutments only using District preservation~|~13 - Bridge Rehabilitation~|~65A2A639979E1F8DCE56EA64CD86157ABB185631 124499~|~1~|~1~|~01/S5K~|~Reconstruction STP 5k-50k~|~04 - Reconstruction - No Added Capacity~|~D441EBD2F76A17AC0431EF433EE707B053F6440A 124499~|~1~|~2~|~02/STR~|~Reconstruction STP Rural~|~04 - Reconstruction - No Added Capacity~|~3D20232C90008C86C43E2BEC55C1D4371494512A 100642~|~1~|~1~|~01/IMS~|~Plan split for Interstate 275 in Clermont SLM 11.02 - 13.88 and Hamilton SLM 35.12 - 37.51~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~367B93FC6884690F5AB0796EC4BC5FCFCB923037 112269~|~1~|~1~|~01/SAF~|~Raised pavement marker project throughout the District~|~21 - Safety~|~E27B1959BD1E3E7B31A3A55ADF89ACB5F0558F65 113392~|~1~|~1~|~01/S>2~|~Roadway resurfacing including milling of existing asphalt and placement of tack coat, new asphalt and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~9F1B7BB0A35B6B6FC97F17DCC70EFA14FB8B7C50 113392~|~1~|~2~|~02/S>2~|~Curb replacement, full depth repair and catch basin replacement to be paid by the City of Riverside.~|~05 - 4R Maintenance - Resurfacing~|~942269F49E3DFC5D800BDD81A69D33A2D5A3B5D9 95291~|~1~|~1~|~01/CMQ~|~For the purchase of 2 trucks~|~~|~10A40D9372098C5D7E25B7EEBFCA0957E7F514F9 112716~|~1~|~1~|~01/MPO/AKRO~|~Reconstruction of SR 261/North Main Street from Olive St to Riverside Dr in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~A75581BA49E4A603BC680F51D85543952D620065 98273~|~1~|~2~|~02/S<2~|~SmoothsealLOR-254-0.00 to 2.82~|~05 - 4R Maintenance - Resurfacing~|~92CA94C5C8F7428CAF46AF5619E9E72345526CB9 98273~|~1~|~1~|~01/NHS~|~SmoothsealLOR-58-16.53 to 20.98LOR-611-5.63 to 8.43~|~44 - Other~|~2BFB88D925CF12BE8D1460D212BC3F7028855A8C 98273~|~1~|~3~|~03/STR~|~SmoothsealLOR-82-0.00 to 5.13~|~05 - 4R Maintenance - Resurfacing~|~75A7A60C095CD54AB3CA41B111D83DBD75AC79F2 98273~|~1~|~4~|~04/S>2~|~LOR-254-2.82 to 2.83~|~05 - 4R Maintenance - Resurfacing~|~AAEA60337FD9495D938AAC0518A1337B522717E6 98273~|~1~|~5~|~05/S>2~|~AC Overlay with Repairs 80/20 Fed/City LOR-10C-0.20 to 0.37~|~05 - 4R Maintenance - Resurfacing~|~C7B781148BA2C0C9101ABBD909B360471255946E 98273~|~1~|~6~|~06/S>2~|~AC Overlay with Repairs 100% City Cost LOR-10C-0.20 to 0.37~|~05 - 4R Maintenance - Resurfacing~|~67C9602830678467F1BF4932ACA2A6D423A2DFD4 109729~|~1~|~1~|~01/NHS~|~Plan split for the NHS locations on BUT-27~|~05 - 4R Maintenance - Resurfacing~|~EEDCD79B51634990CC03A4BA2608C4E8FA48B101 112467~|~1~|~1~|~01/NFA~|~Replacement of structure > 20' span.~|~10 - Bridge Replacement~|~6D0020F2BB9904871BD0B78B7F762251BBEAC7F7 101078~|~1~|~1~|~01/NFP~|~Pavement Markings~|~21 - Safety~|~653E3D453FDE6B6B02730CF4997DF4DE4E8FE50E 117315~|~1~|~1~|~01/SAF~|~Pedestrian improvements on Coles Blvd in Portsmouth.~|~28 - Facilities for Pedestrians & Bicycles~|~3E9DCD5241E6D90D3C875E55694764E9C0074827 91936~|~1~|~2~|~02/S>2~|~This plan split is to rehab urban bridge also includes associated roadway approach work.~|~13 - Bridge Rehabilitation~|~42D1987AFC004B8FA50B161B0E01B3E3A7654A4F 91936~|~1~|~1~|~01/STR~|~Plan split to rehab rural bridge also includes associated roadway/approach work.~|~13 - Bridge Rehabilitation~|~6F56AFB263503A7E6145921BCB0BA0EBEDC98814 115101~|~1~|~1~|~01/NHS~|~Rock fall maintenance by catchment cleanup and rock fall barrier replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8BF3261826138E4CA7683717C5B6243E1AB7B242 104622~|~1~|~1~|~01/MPO~|~Resurfacing Lovers Lane from W Market St to Parkman Rd and Tod Ave from Parkman Rd to Crestwood Dr in the City of Warren.~|~05 - 4R Maintenance - Resurfacing~|~A768375B416E5A305239FE1CA34205577D1FAD20 93109~|~1~|~1~|~01/S>2/REYN~|~District Preservation Urban Paving - 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing with related work on Lic-US 40-00.00 to 01.39~|~05 - 4R Maintenance - Resurfacing~|~48426B9C88FD0F16735F6410188E8A6376134757 93109~|~1~|~2~|~02/S>2~|~District Preservation Funding - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-US 40-01.39 to 04.67;~|~05 - 4R Maintenance - Resurfacing~|~FB77DAAE2F6D4220286B33E3013132EF26074961 93109~|~1~|~3~|~03/S>2~|~Major 2 Funding - 5MT7(80% Federal) / 4MT7(20% State) - See CAP Comments - Resurfacing with related work on: 1) Lic-US 40-04.67 to 06.14;~|~05 - 4R Maintenance - Resurfacing~|~6BBF9CF73C67C03F3F565972BBCB2F7D2B2DC578 93109~|~1~|~4~|~04/STR~|~Major 2 Funding - 5MT7(80% Federal) / 4MT7(20% State) - See CAP Comments - Resurfacing with related work on: 1) Lic-US 40-06.14 to 09.27;~|~05 - 4R Maintenance - Resurfacing~|~8CFE600EB826FAEC37E73FACEA22890A9F084337 93109~|~1~|~5~|~05/STR/SLSD~|~Southwest Licking School District Local Funding - 4BG7 (100% Local) - See CAP Comments - Construction of two right hand turn lanes and traffic signal to improve access to the school. Includes Alternative Bid to upgrade the Spectrum Radio to the District Standard Intuicom EB-6 Plus~|~05 - 4R Maintenance - Resurfacing~|~BBF3097957469ABFDA0E2B5E61EA4E0E4DE2A9B0 93109~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0E783315088E40C0D5F3ADF4BDB695AE4F63E210 90204~|~1~|~1~|~01/ERD~|~Kelleys Island Ferry New Vessel Construction, Erie and Ottawa Counties using Descretionary funding and local match.~|~26 - Ferry Boats~|~9EEAF9E7E9C38966C11EF63AD8AA28B049EAB3F0 102206~|~1~|~1~|~01/STR~|~LAW CR 5 0.17 ER Slide Repair.~|~44 - Other~|~E2B665650FFBC6264ACFFC4811D2C48DDC26D414 111452~|~1~|~1~|~01/CMQ~|~Widening of North Fairfield Road from Lawson Drive to Fairwood Drive from four lanes to five, to provide a center two-way left turn lane.~|~21 - Safety~|~3FEAEADC482FEC7674ECEFACA3F2AA0A3F4EBBC5 97991~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation - No CAP - 90% Federal (4PF7)/10% State (4PS7 - deck replacement on LIC-70-7.70 (SFN 4503120) CR 39 over IR 70.~|~13 - Bridge Rehabilitation~|~4E0CEEECAD2E88BDF2B5E6E9CBF3CD837B5EAAC6 105447~|~1~|~2~|~02/STR~|~Pavement AC Overlay w/Rpr LOR SR 82 5.130 TO 10.060~|~05 - 4R Maintenance - Resurfacing~|~4FC3B0D943709FBEC5FAEBC44996FB938886FA2C 105447~|~1~|~3~|~03/NHS~|~Bridge Work to be completed per KKapustar comments ~|~13 - Bridge Rehabilitation~|~41BA68BCA51DEF280023E4194260113F7573D501 105447~|~1~|~4~|~04/STR~|~Bridge Work to be completed per KKapustar comments ~|~13 - Bridge Rehabilitation~|~90C9FE6B27B08204CDA81F49E8D58BCFAA6E4563 105447~|~1~|~1~|~01/NHS~|~Pavement Fine Poly AC Overlay LOR US 20 13.54 TO 15.920~|~05 - 4R Maintenance - Resurfacing~|~8977DC3AABF60D3F6BD15393487FF25CEDABF052 99872~|~1~|~1~|~01/NHS~|~Signals along Monroe corridor in Toledo~|~21 - Safety~|~03D316B4C4E7CA76435EC8EF6A3383C5F874D600 105623~|~1~|~1~|~01/SAF~|~Local roadway.~|~21 - Safety~|~0D6CA08AA43C1D73F48EBEBD3D6123D5F27A02A1 105623~|~1~|~2~|~02/BRO~|~Structure work no eligible for HSP funds.~|~21 - Safety~|~F251AA561EEF7220FE09D2E791AA962DAF7B032F 113255~|~1~|~3~|~03/NFP/KENT~|~100% Kenton items (pav?t repairs, curbs, etc..)~|~05 - 4R Maintenance - Resurfacing~|~FC03DEA35E3F1A30597BBF6E3E8AA677F5C7369E 113255~|~1~|~1~|~01/S5K/KENT~|~Resurfacing on SR 309 in the City of Kenton in Hardin County. On both sides of the roads from the beginning of the project to the corporation limits of the City of Kenton at 14.514. On the right side of the road from the corporation limits from where SR 309 enters the City of Kenton on the right side at 14.786 and then on both sides of the road from where SR 309 enters the City of Kenton on the left side to Market Street at 15.864. On both sides of SR 309 from Wayne Street at 16.064 until SR 309 leaves the City of Kenton on the left side at 16.802 and on the left side of SR 309 from 16.847 to the end of the project at the east corporation limits at 16.934. A portion of SR 309 on the east side in this project is only in the City of Kenton on the left side but was annexed in 2006 or later so the City is responsible for both sides. 80% federal funds from the District Preservation Program budget with the 20% non federal match provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~47D133FB26D8B4DA763B18E0BF2303E4FBCEE7AB 113255~|~1~|~2~|~02/S5K~|~Resurfacing on SR 309 outside the City of Kenton but inside of the Kenton Urban Area. On the left side of SR 309 from the corporation limits from where SR 309 enters in the City of Kenton on the right side at 14.786. On the right side of SR 309 from 16.847 to the end of the project at the east corporation limits at 16.934. Federal and State funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~0571835A768EAABF0E50032B2CAE450ED37DF2DB 103425~|~1~|~1~|~01/NFA~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~9491997D518F35E17449E9AD2471BE20B6FB062E 121395~|~1~|~1~|~01/NFP~|~FY29~|~17 - Construction Engineering~|~2AB64706123DDC0525E3FC3CE2584DCC78016C9C 103076~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~EA8E6A0DC89096079B163769E6F2EC60985DFA6F 94262~|~1~|~1~|~01/NHS~|~FY2016 Urban Paving in the City of Middletown on SR 4 and SR 4D. This plan split is for the 80% ODOT and 20% City items on SR 4 and SR 4D.~|~05 - 4R Maintenance - Resurfacing~|~CC9075893C4637C0A7290A783B9DC44CB47AC1C1 94262~|~1~|~2~|~02/NHS~|~FY2016 Urban Paving in the City of Middletown on SR 4 and SR 4D. This plan split is for the 100% City items on SR 4 and SR 4D.~|~05 - 4R Maintenance - Resurfacing~|~1F8A95D777A72D0CF9B2CC4B68C4EFBD327B76DB 103498~|~1~|~1~|~01/NHS~|~ER event OH16-01 DSR# BEL-004~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E99C23E349727BA4B832B747B90EC62A99B935E9 103498~|~1~|~2~|~02/STR~|~DSR BEL-008~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~254513566C2509D74CA955093261DDAFBCB05950 109073~|~1~|~1~|~01/STR~|~GSM Funding - 80% Federal (4SF7) / 20% State (4SS7) - mine grouting on PER-669.~|~44 - Other~|~28EE74D49A820A97DCFD5B5EFCD1C7B1F8A4E1F8 91596~|~1~|~1~|~01/SAF~|~A safety funded project to build a roundabout at LUC CR4 6.17-6.18/ LUC CR39 0-0.1/LUC TR39 0.48-0.49~|~21 - Safety~|~74373D24F4DC409DAB18479871068FDD6ECBDF6F 114817~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~06CEC826314813AB20E6ABB0D33E77E2DBB1192E 114817~|~1~|~2~|~02/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~7B96F381CBCFEC031E70039B021E0392ED47170E 98548~|~1~|~1~|~01/BRO~|~80% federal w/20% local matching funds for municipal bridge funding eligible work items.~|~13 - Bridge Rehabilitation~|~F865946BD87FC1A834888F57EF60C03C28FBD178 116049~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance~|~21 - Safety~|~B3C3E57F877653AF35D48A04FD87B92A194D5B78 125894~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1C685101056880C64D230A2AE3FD36D17DC4EC07 111211~|~1~|~1~|~01/IMS~|~Add fencing to the Jeremiah Morrow bridges (WAR-71-1514L/R) and security camera upgrade.~|~48 - Bridge Protection~|~15CDDF6396C1B2B0B252D437697303CAA165F74B 111211~|~1~|~2~|~02/IMS~|~Correct erosion issues.~|~44 - Other~|~CA02819CF93DCBCC8F124669558607336AE3C779 95653~|~1~|~1~|~01/MPO~|~Mill and fill Columbus Avenue from Homestead Street to Hayes Avenue (SR 4) in Sandusky Ohio. Project will include utility adjustments and pavement markings.~|~04 - Reconstruction - No Added Capacity~|~E85F7BCD40C62861A7F0E20F9BA870770408CBBD 101093~|~1~|~1~|~01/NHS~|~9 bridges NHS Rural~|~13 - Bridge Rehabilitation~|~39F6A3FB4E83E1AF14494657D6548A6E6724AFA0 101093~|~1~|~2~|~02/NHS~|~8 Bridges NHS Urban~|~13 - Bridge Rehabilitation~|~B7AA7871CFCFA4197346626A56171DCB0CEFD782 101093~|~1~|~3~|~03/STR~|~4 bridges Other Rural~|~13 - Bridge Rehabilitation~|~3DEC50E396D9F6478DBCDC74097D18EDA983D43E 105772~|~1~|~1~|~01/S<2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D4AD9EF7AB2E854BA148E03FCDA3ABC9DBABA1CD 105772~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded items for the replacement of the waterline within the project limits.~|~05 - 4R Maintenance - Resurfacing~|~62A21122595DD26F9FAB359584297E6E8ECB8C15 88903~|~1~|~1~|~01/S>2~|~STA SR 297 0.66 to 1.39~|~05 - 4R Maintenance - Resurfacing~|~04283AACE8A8B1197B19BDD85548DF1BEB934833 88903~|~1~|~2~|~02/S>2/CAN1~|~STA SR 297 1.39 to 2.03 (80/20 split)~|~05 - 4R Maintenance - Resurfacing~|~AA9EF7569757E2D958487C608C10472B1C437067 88903~|~1~|~3~|~03/S>2/CAN2~|~STA SR 297 1.39 to 2.03 (100% Local)~|~05 - 4R Maintenance - Resurfacing~|~DB361344FE681CF2CD1D50F5F127EDA7E388FCED 105314~|~1~|~1~|~01/BRO~|~Acquire and demolish structures required for the western approach to the new Western Hills Viaduct. Remove western plaza to the extent possible while maintaining traffic. Fill and grade the western approach and construct new retaining walls where practical and where they can be constructed in a manner compatible with the design for the future replacement of the viaduct.~|~~|~765506FD1DF21C00D7F53971845EF43F28D133DC 113440~|~1~|~1~|~01/NHS~|~Major rehabilitation of 4-lane US 22 in Harrison County.~|~04 - Reconstruction - No Added Capacity~|~284E2BBBB052C53299CF4BBE0DC480B1200E1564 113440~|~1~|~2~|~02/BRO~|~All bridge rehabilitation work~|~13 - Bridge Rehabilitation~|~9670C8283DDC4A98E81850F0E810FE0AEE88A373 124057~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~248510C98AE6C6AFEBA2E94A60A433AA38D57684 122298~|~1~|~1~|~01/NHS~|~Plan split for bridge rehabilitation work~|~13 - Bridge Rehabilitation~|~73CB9BDE682A0AC6FC5712FED06DF469FBE419D2 101587~|~1~|~1~|~01/BRF~|~Bridge replacement work that is County LBR eligible.~|~10 - Bridge Replacement~|~40D6D83092C64C84A56C07A1576C587641F050D0 121832~|~1~|~1~|~01/NFA~|~installation of EV Charging station at Forest Park Municipal Campus~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~473D5454FB9DFBB2C2D03516D255ACDB6731A62B 101638~|~1~|~1~|~01/NHS~|~Complete the stabilization of the Indian Creek stream stabilization.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8E9F99F3C5EAF1CCB4AAAA4253F746D1A5588C83 124710~|~1~|~1~|~01/S>2~|~Plan split to replace state bridge on federal aid system~|~04 - Reconstruction - No Added Capacity~|~910B15223D9E3BB910AE0E45860F60C53F2EEC0E 118118~|~1~|~1~|~01/MPO~|~MPO STBG funds~|~05 - 4R Maintenance - Resurfacing~|~0F2F66BDD25BA61650FBC5B529D37671324D5332 118118~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope, including asphalt rejuvenating agent.~|~05 - 4R Maintenance - Resurfacing~|~45B9EE756B6292175F3408D4AC3D25A19E23A5D8 127213~|~1~|~1~|~01/MPO~|~Created Plan split 1.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E6089D7FACBC2A5EA4D23870DF42AABC825F3D05 110923~|~1~|~1~|~01/NHS~|~Install a Culvert Liner.~|~44 - Other~|~1A959AEA6B7821AB7DAC63A9306FAE1F3E80C503 97912~|~1~|~1~|~01/NFA~|~Culvert replacement in Foster Park, part of the Trumbull County MetroParks system.~|~~|~190747D44F421217460BFCCF4F60C50C8579BD60 101104~|~1~|~2~|~02/S<2~|~100% local funded items and all items over Federal Cap - ie: Pavement repair~|~05 - 4R Maintenance - Resurfacing~|~2DBEFFF404686E7D842BA9CE1E70C0C506B081CA 101104~|~1~|~1~|~01/S<2~|~SR 64 Urban paving funds~|~05 - 4R Maintenance - Resurfacing~|~E673B580B70904AB5ED8D7810205A0982E7CCBE4 96317~|~1~|~1~|~01/STR~|~STP 80/20 Fed/State. Bridge funding for 7.55 and 10.5 structures~|~13 - Bridge Rehabilitation~|~457D12ED51A8B0204E6D4BAECEC7F814B4366C74 96123~|~1~|~1~|~01/NFP~|~Construction of a new county garage~|~17 - Construction Engineering~|~FC044556A21172894DE1A0DF24E7199028E75396 120420~|~1~|~1~|~01/NFP~|~Established Plan Slit 01/NFP/OT ~|~17 - Construction Engineering~|~08C378A5E24C253D8179FEB3C4E3D1617BB2A6E1 106997~|~1~|~1~|~01/STR~|~GSMP slide repair TUS-800-26.67.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~31E56199FF914A446952D89238530AF25ED1AF32 113537~|~1~|~1~|~01/ENH~|~SRTS items~|~44 - Other~|~6DB69464E8CF764D8563D16B9762CE46BEFD7AC4 88565~|~1~|~1~|~01/NHS~|~WOO-420~|~05 - 4R Maintenance - Resurfacing~|~D7F5BDE5F2D637F152A41EC9EE639C849196B4FF 112667~|~1~|~1~|~01/S<2~|~2" mill and fill with asphalt concrete on: SHE-29 SLM 15.14 to 16.91~|~05 - 4R Maintenance - Resurfacing~|~1588052D4FA8F82877A8A7A1259BC3849FF5A5FE 114802~|~1~|~1~|~01/STR~|~Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~E6C3FC9D3AEB6F5EBAA97CC2C7C69F7F1B3CA3A1 114802~|~1~|~2~|~02/NFA~|~Not on Federal Aid System Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4F36E9C71533BE30FE82A3A50F394D8DEE4AA586 92215~|~1~|~2~|~02/BRF~|~Bridge Replacement~|~~|~6CA56B78923F2967BDA576F4FE2D975ABE49886C 92215~|~1~|~1~|~01/BRF~|~plan split~|~~|~BAD33FAD39231EF5AE3BBEC238505C9F1B5EA6B3 120386~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~9E8FD37A59D0F68EDD4AD70FA676B4DF19973192 112846~|~1~|~1~|~01/S<2~|~ASHVILLE-S BLOOMFIELD Urbanized Area - SR752 and SR 316 Locations~|~05 - 4R Maintenance - Resurfacing~|~ABEDC00DC576E1567723D5C7B76BA2B5D80D395B 112846~|~1~|~2~|~02/S<2~|~DARBYDALE Urbanized Area - SR 762 from 0.00 to 3.01~|~05 - 4R Maintenance - Resurfacing~|~BDB098FFB8F65ECD6BD9A606427909F3A0F6344C 112846~|~1~|~3~|~03/STR~|~SR 762 from 3.01 to 11.18~|~05 - 4R Maintenance - Resurfacing~|~EF4DF3CCE35753FC9B9126B3680C96E4CE35EB60 95122~|~1~|~1~|~01/STR~|~Culvert/drainage at WIL-6-5.00~|~04 - Reconstruction - No Added Capacity~|~4B59D52421B6A824C465382576409145C0FBB98A 97582~|~1~|~1~|~01/NFP~|~Various bridges in D-2.~|~17 - Construction Engineering~|~8D90F1B7A6AACB0876DF74DE7B1E8484524EE0F8 116318~|~1~|~1~|~01/SAF~|~Construct roundabout at SR309/CR162~|~21 - Safety~|~1B7A7096554D85C91825AB33616B336C9CBDD4BF 100675~|~1~|~1~|~01/STR~|~Resurfacing JEF-150 from Dillonvale to Mt. Pleasant at SLM 11.95, and JEF-647 in Mt. Pleasant from SLM 1.37 to SLM 1.87~|~05 - 4R Maintenance - Resurfacing~|~99BD0C9EA2670A9197AB7B0E540350C4BA527E75 100675~|~1~|~2~|~02/S<2~|~Resurfacing JEF-150 from SLM 11.95 to SR 7, and JEF-150A in Rayland from SR 150 to the SR 7 NB Ramps~|~05 - 4R Maintenance - Resurfacing~|~C9FE664C2451A894494934A0DBEA717E2D4CEDD2 88443~|~1~|~1~|~01/ERD~|~Federal earmark funding for all work~|~28 - Facilities for Pedestrians & Bicycles~|~F2A8BEADE072BDD9023B7C494A4D53F108172506 102415~|~1~|~1~|~01/NHS~|~STA US 30 from 21.55 to 25.84.~|~05 - 4R Maintenance - Resurfacing~|~8F7DB10329159AB35046732B3B1240FEB61FA37B 117394~|~1~|~1~|~01/NFA/TRCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~C5968A9FF00AA5F52A1EAF98C5311FB10BC161D1 82266~|~1~|~1~|~01/S<2~|~Sign Replacement~|~21 - Safety~|~6B61842676B7F5146AAC5279E61FC38AC0DFD6E8 114294~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8~|~21 - Safety~|~6CB4FB86AA3716082790A6228B3972F7E6E321C9 98300~|~1~|~1~|~01/MPO~|~Mill & fill the north and south thirds of Lake Avenue.~|~~|~EB23B1574128194253249AC6AF5C67F041B9D506 97540~|~1~|~1~|~01/BRF/RIC~|~Ohio Bridge Partnership Program. SFN 7033982 - Hay Rd over unamed branch of Pine Run~|~10 - Bridge Replacement~|~33975A9644D0D4E061FF9C0AFF510F9999941524 97540~|~1~|~2~|~02/BRF/RIC~|~Ohio Bridge Partnership Program. SFN 7031599 - Bellville Johnsville Road over Cedar Fork Creek~|~10 - Bridge Replacement~|~B99214857EED97A5C7DECCE043B3B0D1B8F975CE 82257~|~1~|~1~|~01/IMS~|~100% Federal / Interstate / Signs~|~21 - Safety~|~08DAFF0C752D08289B7E4886D416108361E1963C 100077~|~1~|~1~|~01/NHS~|~Bridge RepairLOR-US-2013.020 SFN 4706609 OVER LOR-20-1303 Reactive Maintenance Bearing reset/repl (025) Conc patch(non-deck) (010) Deck patching(conc) (049) Exp jt repair/repl (048) LOR-US-2015.290 SFN 4701267 OVER LOR-205-0415 CH Preventive Maintenance Deck Sealing (051) Reactive Maintenance Conc patch(non-deck) (010) LOR-US-2015.860 SFN 4703456 OVER LOR-20-1610 Preventive Maintenance Deck Sealing (051) Bridge railing upgrade/repair (061) Reactive Maintenance Bearing reset/repl (025) Exp jt repair/repl (048) LOR-SR-1000.000 SFN 4701410 OVER LOR-20-1612 Preventive Maintenance Deck Sealing (051) Reactive Maintenance Bearing reset/repl (025) Minor Rehabilitation Bridge railing upgrade/repair (061) ~|~13 - Bridge Rehabilitation~|~E83EB87696387EA2A53DA5FFDCA37F1493BBE95D 96243~|~1~|~1~|~01/S>2~|~Widening of Dayton Drive from 2 to 4 lanes between Maple Avenue and Main Street including new curb and gutter, storm sewer retrofitting, and upgrades to the signal at Dayton Drive and Maple Avenue. In addition, pavement resurfacing from Maple Avenue to Xenia Drive (SR-235).~|~03 - Reconstruction - Added Capacity~|~68CAC29095B5084FC13D4DC8F2B0040A23BC9828 123427~|~1~|~1~|~01/NHS~|~Resurfacing and repairs on US 22~|~05 - 4R Maintenance - Resurfacing~|~D344DB6BDA0B9F9B0ECAAD67A06A1E6D3BA02D0B 121445~|~1~|~1~|~01/NHS~|~Plan split for OTT-2 and OTT-53~|~05 - 4R Maintenance - Resurfacing~|~3F22FFA7B21A4374F49AE3B717C57D4EB791C469 109646~|~1~|~1~|~01/NFA~|~Resurfacing CAR-524 and JEF-524~|~05 - 4R Maintenance - Resurfacing~|~57A08FA4C88DDCE5508C6113842BDE8FDD6775C9 109646~|~1~|~2~|~02/STR~|~Resurfacing CAR 542 and COL 164~|~05 - 4R Maintenance - Resurfacing~|~ECBD77D6E417BE55FFD110C5D0602E8A2DCA6300 83138~|~1~|~1~|~01/NHS/GAL~|~Small City Fed 4B97 / District State 4PS7 (4PS7 capped @ $340,000+CE) then fund with Small City Fed 4B97 / City of Galion 4BG7. Small City Funds capped at $2,500,000. 100% City of Galion after caps are met.~|~04 - Reconstruction - No Added Capacity~|~AC081110D3E0EFD6FD110DBC536B5F35BE120B33 83138~|~1~|~2~|~02/BRO~|~Bridge Replacement - CRA-598-0007 / sfn:1703609~|~13 - Bridge Rehabilitation~|~BDCFECAF274EE564E1590F027AB21FAE826F9EE9 115379~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4.~|~~|~F00AF11E847B9C767BCBCC9DC72EDEB013D8B1E8 115832~|~1~|~1~|~01/NHS~|~Bridge work - Repairs, overlays or other miscellaneous work~|~13 - Bridge Rehabilitation~|~D644FDCD50AD0AEC1A8D274EE76B6437E7EA5CCE 115832~|~1~|~2~|~02/NHS~|~Conduit - Misc Drainage Work~|~05 - 4R Maintenance - Resurfacing~|~42DDCF7AD0B88887E854897650BDE19CA8FD4BD8 105669~|~1~|~1~|~01/NHS~|~Ohio Rail Development Commission - 900% Federal (4FP7) / 10% General Revenue Fund (4FA7) - TRC is Authorized - No CAP - Rail Crossing Traffic Signal improvements along US Route 22.~|~22 - Rail/Highway crossing~|~42E20B40855F728067C11D5FA2BABE637EACB445 106918~|~1~|~1~|~01/SAF~|~plans split~|~28 - Facilities for Pedestrians & Bicycles~|~23DB24873BD3FA1E5EDEBF4667764354588FB7D2 114386~|~1~|~1~|~01/STR~|~Single Course Chip Seal w/Fog Seal on various routes in Cos and Gue counties ~|~05 - 4R Maintenance - Resurfacing~|~ECFF6E7EC4CF870B6511707A992B41253FE9B7F0 113724~|~1~|~1~|~01/SAF~|~High Street at Dayton Street: Install curb extensions at all corners to visually narrow the street and reduce travel speeds, shortening crossing distances at crosswalks and improving visibility of pedestrians to motorists. Dayton Street from Enon Road to Elm Street: Construct a side path together with the existing sidewalk to separate bicyclists from motor vehicles. Upgrade intersection crossings to emphasize pedestrian/bicycle presence.~|~21 - Safety~|~E9D990A96962DFCE6F60D1F0FD9A6F1F5BCA4F8E 122886~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~769DF676E19CC56FD0AAF3A7E14F15955AD24B54 92984~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on on: 1) Cos-US 36-00.00 to 16.14; 2) Cos-SR 60-14.51 to 14.61;~|~05 - 4R Maintenance - Resurfacing~|~534FA5F78FB3E2ABF80BCA728EFDA551F6D1E8C8 92984~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on on: 1) Cos-US 36-16.14 to 16.40;~|~05 - 4R Maintenance - Resurfacing~|~18142DA0727CE4BEDCCF3FE277397708016490B7 92984~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-US 36-16.40 to 18.95~|~05 - 4R Maintenance - Resurfacing~|~78AEAC82DF9A2DF7995BFC5986D52C18BC9B6742 83182~|~1~|~1~|~01/NHS~|~It is proposed to perform a "scour correction project" of the right & left bridges over Paint Creek 0.59 mile north of the SR104/Three Locks Road underpass.7100396 District 9 SROSUS00023**C : 9.260 Left 7100426 District 9 SROSUS00023**C : 9.260 Right80% Fed/20% state 01/NHS/BR/State~|~44 - Other~|~A127603CB701BFCE9CFB158EF6A716DC9112B3DD 124818~|~1~|~1~|~01/IMS~|~Bridge repair due to collision damage~|~13 - Bridge Rehabilitation~|~9E226A21F87CB0D3F55F0F4E27C4650D51469BF8 102763~|~1~|~1~|~01/STR~|~resurface Hen SR 281~|~05 - 4R Maintenance - Resurfacing~|~23782E162FC586E844ADA6D71A78BFEC9A7541F5 102763~|~2~|~2~|~02/STR~|~Hen SR 281 Bridges~|~13 - Bridge Rehabilitation~|~5504B46DF1B2A3DB0CD5C5D4CEE3E15AEB00D089 111900~|~1~|~1~|~01/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac.~|~44 - Other~|~045E4748B1C1CAA07781B3EFBE25F2EB5E489821 111900~|~1~|~2~|~02/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac.~|~~|~542E8D21059B039BD85764723CDB60B906D2ED81 111900~|~1~|~3~|~03/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac.~|~~|~13421591479D4714E519AD808C501EE35BEF2264 111900~|~1~|~4~|~04/NFP~|~Construct new 600 LF road from N. Reading Rd. west & terminating in industrial-scale cul-de-sac.~|~~|~B3AE5F491364CD2BBA55CC3E6245A05ED89F80ED 119830~|~1~|~1~|~01/SAF~|~Construct roundabout at the US 62/SR 665 intersection~|~21 - Safety~|~5FAA7C9B71744B78731E28B86A2131BF2BD6A1F5 106562~|~1~|~1~|~01/NFA~|~The Fulton County TID will widen and improve County Road H in Fulton County, near the Village of Delta. Proposed to widen it from 21 feet wide to 26 feet.~|~01 - New Construction~|~4CDF164E09878760D6CC9542827648CA4B7EE6AD 116778~|~1~|~1~|~01/IMS~|~RIC IR 0071 19.61~|~04 - Reconstruction - No Added Capacity~|~107E5E26E446414D5BB3B84C7F3E3CBF691B1720 116778~|~1~|~2~|~02/STR~|~WAY SR 0226 05.26.~|~04 - Reconstruction - No Added Capacity~|~B19D9625A633CB1C82EB3047080D9E8956D2D80B 124501~|~1~|~1~|~01/NFP~|~Created for J&C TID involvement~|~44 - Other~|~B2E0954760474E3291E5F693FFAEB463FAE4D928 102118~|~1~|~1~|~01/NFP~|~SFN 4805917 & 6201628~|~13 - Bridge Rehabilitation~|~6AE08ADCF1EFF964A9963D7D1D6A808046AE06D6 92719~|~1~|~1~|~01/MPO~|~Resurfacing of STate Street from Robinson Avenue to Highland Avenue~|~05 - 4R Maintenance - Resurfacing~|~6ED0E6F1427B9075262817A4F314591039B1346E 119744~|~1~|~1~|~01/NFP~|~Creating Plan Split for TED involvement~|~~|~520A0B740273CC615F3D916EF148A900DC8B2497 113789~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~9791FB72774C6D18C4323D81AD4F960273F8F0DB 110722~|~1~|~1~|~01/NFP~|~All work in this project.~|~44 - Other~|~B89E66353DC319AF0443E60B3AC537AE3309A291 123462~|~1~|~1~|~01/NFP~|~Provide positive drainage at several locations throughout Franklin County~|~99 - State Preventative Maintenance~|~A5B4A343E54A921AA82DBD63E8F2F9187A837DB8 97224~|~1~|~1~|~01/NHS~|~Intersection improvement project at ATH 550 0.38. NHS route funded 80 federal/20 state.~|~17 - Construction Engineering~|~4A42C7A183F9C901742D9EC809E3BEC3F00E5EAE 97224~|~1~|~2~|~02/S<2~|~Intersection improvement project at ATH 13 0.00. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~A64323C591980091AF4847C2A656723AA39724A5 123684~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban locations~|~13 - Bridge Rehabilitation~|~0CBBC2CAA39752C1A24E1AFE10F2D62B81F02943 102046~|~1~|~1~|~01/IMS~|~Spot concrete slab repair at various locations on FRA IR 270 and MAD IR 270~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~79DF0FF84646500EA669AE5EB900972F3E92AD34 102046~|~1~|~2~|~02/STR~|~Spot concrete slab repair on UNI-739 from 0.59 to 5.94~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5864E1E5C8A61D7ED4523AF0448617D7DAE97AE6 107995~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge CLI CMDRV 0029 (SFN: 1460057).~|~13 - Bridge Rehabilitation~|~3AF70525B3DBC7944AC942CFBEF9B46725B02D65 97565~|~1~|~1~|~01/IMS~|~Diamond grind and repair concrete pavement on MAH-IR 76 eastbound from SLM 7.05 to 8.65 and MAH-IR 80 from SLM 0.00 to 0.53. Also includes a small quantity in the westbound direction.~|~~|~398B6AF01BCF0B4275CF2B4AA8F2110B3EDD267F 92929~|~1~|~1~|~01/IMS~|~Split for all work necessary to repair the slope funded at 90% federal and 10% state. .~|~44 - Other~|~071A6EC991E1CD629502848F8C068559CF143DFC 102338~|~1~|~1~|~01/STR~|~Microsurfacing SR 9 and SR 171.~|~05 - 4R Maintenance - Resurfacing~|~0076BF038FF188C2FB0AB5CB7C1FA5DDA3694733 93371~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% federal) / 4PS7 (20% State) - No cap - culvert replacements at DEF-127-0211 (SFN 2001985) and DEF-127-0267 (SFN 2002019).~|~04 - Reconstruction - No Added Capacity~|~FCDDC31B007D75B8AEC204D91AC2596D57918C39 121267~|~1~|~1~|~01/STR~|~All Work Included in this split~|~47 - Bridge Preventive Maintenance~|~EB25B0BACCDB6584BFB2EFFA55221E7F03C8102F 118662~|~1~|~1~|~01/NFP~|~District wide systematic RPM replacement project~|~21 - Safety~|~005E593226B7342669339B0C1B81E88459AC7FC8 92068~|~1~|~1~|~01/ERD~|~Plan Split for TRU Warren Riverwalk Bullhead~|~28 - Facilities for Pedestrians & Bicycles~|~E7218562F55C1AA4D0603F650C1E12BA7036009F 19415~|~1~|~2~|~02/STR~|~SCI SR823 6.67-10.22 PortsByPass Brdgs added for $11,002,590.00. This includes the Cattle Crossing structure, Brdg SCI-234-0122, Brdg SCI-823-0837L. Brdg SCI-823-0837R, Brdg SCI-823-0917L, & Brdg SCI-823-0917R.80/20/split~|~08 - Bridge - New Construction~|~17CB0B4BED21FD96165C7A2A1526258570706AA4 19415~|~1~|~1~|~01/STR~|~SCI SR823 6.67-10.22 PortsByPassIt is proposed to construct a new Bypass beginning @ US52 (SR823 SLM 0.00), north and terminate @ US23 (SR823 SLM 16.78).The project includes 5 new interchanges and several new bridges. Portsmouth Bypass was previously programmed under 3 PID's. Phase 1 was originally PID 19415 & now includes all 3 phases and originally began at SLM 6.81, Shumway Hollow Rd. and terminated at SLM 10.13 Lucasville-Minford Rd. Phase 2 was under 79977 and began at SLM 10.13 Lucasville-Minford Rd. and terminated at US23 SLM 16.78 and Phase 3 was under 77366 beginning at SLM 0.00, US52 and terminating at Shumway Hollow Rd. SLM 6.81.80/20 split~|~01 - New Construction~|~24FCA48D43778F283284EF65FD6DD4F047B491E5 19415~|~1~|~3~|~03/STR~|~This is for Non-Construction related items on the Bypass.~|~01 - New Construction~|~5AD91CB9709B3935D6BB4DFDFF83A7DD582B59AF 122493~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~3BEDCED0DFE85E1710EC22E98FF1822D10278A7E 100828~|~1~|~1~|~01/NHS~|~Replace bridge size Culverts CLI-68-17.97 over Todds Fork and CLI-68-18.08 over a tributary to Todds Fork.~|~04 - Reconstruction - No Added Capacity~|~DEFC10585838F8C09991EA1A37307D2323EE5C1F 116399~|~1~|~1~|~01/IMS~|~Microsurfacing.~|~~|~3FE0B9608086AA365AD7ADB3A2208F8581D305D6 116399~|~1~|~2~|~02/NHS~|~Microsurfacing.~|~~|~CF3787D5729E5741120729FDB9EF822D7E9DE19E 116399~|~1~|~3~|~03/S>2~|~Microsurfacing.~|~~|~E4FB7DA253078696F59BCFF9D256BB60D0FAFD7C 116399~|~1~|~5~|~05/STR~|~Microsurfacing.~|~~|~3BFFF8C2CB77B7C812B1097AC3B3C065E94AD5D6 116399~|~1~|~4~|~04/S5K~|~Microsurfacing.~|~~|~78D346FB6777B7D5657D75E7AD2B317C8433DDAA 103391~|~1~|~1~|~01/STR~|~ndslide repair utilizing a drilled shaft wall with cribbing and pavement repair. ATH 329 5.44. Work length approximately 200 ft. DSR ATH-003.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D0E9A615FBFEDBE223F2E69490C34D3EE325266 117638~|~1~|~1~|~01/IMS~|~type A emergency to repair superstructure HAM-275-2123~|~13 - Bridge Rehabilitation~|~BCFCA297C3B5214CF058E8DD066BD75900F71B98 107357~|~1~|~2~|~02/STR~|~Resurfacing on CR 193 SLM 1.89 to 10.22~|~05 - 4R Maintenance - Resurfacing~|~CEEE820110B199FC36D90E73CD1F2AC1EDC49B2D 107357~|~1~|~1~|~01/S<2~|~Resurfacing on CR 193 from 1.72 to 1.89 - Miami County Engineers/CEAO~|~05 - 4R Maintenance - Resurfacing~|~6E87E171955575C091EC15259CCF6E8BBE0E0EE4 102945~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~10 - Bridge Replacement~|~60D36370784616ABFD8D2817B828BFF562D19FE3 88744~|~1~|~2~|~02/NHS~|~Paving on NHS routes as preventive maintenance~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~258A0C0B9C3730245F9DA81CB39BC087E0EB9650 88744~|~1~|~1~|~01/IMS~|~Interstate paving for preventive maintenance on various District 11 interstates.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8D05E5108A61D1EF5556B7B3B13251D5AF0F6105 106303~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4.~|~~|~D475DD3F725630A34A3D5B4AB3155B4FD3012289 114220~|~1~|~1~|~01/NHS~|~Bridge rehabilitation > 20' span.~|~~|~251B6FF28A30BA394D36AADDEAD32441969B43D5 91928~|~1~|~1~|~01/STR~|~D09 Guardrail Project 2014LAW-SR-93 3.250 to 10.500 LAW-SR-93 19.000 to 26.830 LAW-SR-141 9.500 to 10.500 PIK-SR-104 5.500 to 9.000 SCI-SR-125 10.000 to 11.090 SCI-SR-140 6.030 to 7.000 80 Fed/20 state01/STR/OT/State~|~44 - Other~|~93619AC710279480E8FE52A8C635D218CE6F0EBA 91928~|~1~|~2~|~02/S<2~|~D09 Guardrail Project 2014SCI-SR-140 0.000 to 6.030 80 fed/20 state02/S<2/OT/State~|~44 - Other~|~9717C32B0745CC5C0E2E2D917AD5A50179ABFB4E 91942~|~1~|~3~|~03/NHS~|~This plan split is for resurfacing on SR 65 from 6.22 to 7.86. This is a NHS federal aid route.~|~05 - 4R Maintenance - Resurfacing~|~12736AF9D3EB5DE19A690C29986BA45F84E685AD 91942~|~1~|~2~|~02/S<2~|~This split is for resurfacing the portion of SR 65 from 9.58 to 10.19 which is inside the Ottawa Glandorf Urban Area. This is a non NHS federal aid route.~|~05 - 4R Maintenance - Resurfacing~|~E2AF57CF1CA40A9EAE3CF3F49ECFE2D643F713CB 91942~|~1~|~1~|~01/STR~|~This split is for resurfacing SR 12 and the portion of SR 65 from 1.45 to 6.22 and from 10.19 to 15.58 which is outside the Ottawa Glandorf Urban Area. These are non NHS federal aid routes.~|~05 - 4R Maintenance - Resurfacing~|~3897541096340492ECF74ADF3403B2508A16F3AB 111186~|~1~|~2~|~02/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A028DDA6EA680C1DB99C6DC5C346CFB5C951A310 111186~|~1~|~3~|~03/NFA~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5F34A209F0C2680643CF9CC89789AA72DC579E21 111186~|~1~|~1~|~01/IMS~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~31C198105367EB88D88711064D2D5C65DD88CB0E 121300~|~1~|~1~|~01/NFP~|~added GR plan split.~|~21 - Safety~|~2C484BDEFE282CA4D94AE1BDB333974CC2EC8022 121312~|~1~|~1~|~01/NHS~|~Resurfacing of US-422~|~05 - 4R Maintenance - Resurfacing~|~E56DAADDDD1D4F42B981B4D43F01B15919E3ED20 121312~|~1~|~2~|~02/STR~|~Resurfacing SR-88~|~05 - 4R Maintenance - Resurfacing~|~8F72D17989D23A0B00577AD0DAEA92A27A759785 110819~|~1~|~1~|~01/NFA~|~The County will construct 400 linear feet of two 11' wide lanes and install 1,600 cu yd of embankment along Bandy Rd.~|~01 - New Construction~|~673DEA11BF7B10A89C2A6DD0BBF26062DB06055F 124398~|~1~|~1~|~01/S5K~|~Superstructure replacement on SR 768 (SFN 4203917)~|~13 - Bridge Rehabilitation~|~7EDD71F7417CB14C5F02F14E848C4C77906EC9F6 113320~|~1~|~1~|~01/S>2~|~Mill and resurface Bellbrook Ave. Full depth repairs where necessary. Sidewalk and curb repair as needed.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~79519F9F9C811F68BDAA7E27268C90367BE22EFD 120816~|~1~|~1~|~01/S>2/MACE~|~Bridge replacement.~|~10 - Bridge Replacement~|~36D4ED114C1992C895EE76C12A0A52E23E83DFE1 99838~|~1~|~1~|~01/S<2/GRAN~|~LCATS/Village of Granville Resurfacing - 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Resurfacing of CR 118 from 00.00 to 00.50C (Cedar Street from SR 661 (N. Pear ST) to Granger Street; and Welsh Hills Road from Granger Street to the east corporation line).~|~05 - 4R Maintenance - Resurfacing~|~BE4936F24E6773B30A012F697839B4B3656DC7C9 101399~|~1~|~1~|~01/NHS~|~CLE SR 32 SLM 2.58 to 7.0; full depth repairs approx. 5%~|~05 - 4R Maintenance - Resurfacing~|~33D4BA43B7A9B92EB84F8D95861EE264985BBF6C 101399~|~1~|~2~|~02/STR~|~WAR SR 123 SLM 12.0 to 16.08 - 2' x 3" x 9 miles partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~67CF824AC0D896884A41A6C370AA7BB9BBB1875E 101399~|~1~|~3~|~03/S>2~|~WAR SR 123 SLM 16.08 - 17.0 - 2' x 3" x 9 miles partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~5D2A20C345AE865AE4ACD6BE48A1426C09FDE114 109636~|~1~|~1~|~01/NHS~|~Emergency repair on PIK 32 20.20.~|~04 - Reconstruction - No Added Capacity~|~B24BF195EFC71C6BC3A3C737C5E2F9074FE55EF3 103510~|~1~|~1~|~01/STR~|~DSR BEL-008~|~~|~647D8BBE05502E6C03715237AB0E0E88F208A62F 101568~|~1~|~1~|~01/ENH/NEWA~|~"01/ENH/OT/NEWA" City of Newark TA project - approved for mulit-use trail for fiscal year 2018 with a maxium dollar amount of $261,250 at 95% utilizing TRC~|~~|~432D42BB1AA4A5211EDC6188DFFF8FEDCD85B64A 105894~|~1~|~1~|~01/S>2~|~Plan split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~DF63073421400BE4AE0C84266B32FA627A7A93F2 105894~|~1~|~2~|~02/S>2~|~Plan split for city work that is not eligible for Urban Paving funds.~|~05 - 4R Maintenance - Resurfacing~|~53D3D1FECA0D19EB07D59C962679C71DB184B161 93791~|~1~|~1~|~01/SAF~|~This portion of the project is being funded with all ODOT Safety Funds: resurface Westwood Northern Blvd from Sutter to Beekman with open graded friction surface course; install underdrains to address groundwater issues~|~21 - Safety~|~D89CD0DA93F2E7B9AB8AD8AE039B9267F66B0A90 93791~|~1~|~2~|~02/S>2~|~Resurface Westwood Northern Boulevard from the City of Cincinnati Corp. limit to the intersection of Sutter. This portion is funded $2,654,400 from OPWC, and the remainder will come from the City Capital Fund.~|~05 - 4R Maintenance - Resurfacing~|~EF26AFF1B2DC50455EAA7158116D8555AECF6061 117121~|~1~|~1~|~01/S>2~|~Primary plan split for STBG eligible items - entire project~|~21 - Safety~|~17D1AB3E0291395857907A7EEC63F9C63C6C11D6 87133~|~1~|~1~|~01/STR~|~ Rehabilitate bridge CLE-133-2770 (sfn 1303546)by replacing the 13' concrete slab.~|~13 - Bridge Rehabilitation~|~4B21CE36C9AC93AD9C3734D062F27FE291137AA7 111215~|~1~|~1~|~01/NHS~|~Installation of centerline rumble stripes. ATH 33 19.30-25.36 and MEG 33 0.00-2.85. NHS route funded 100% Federal Safety.~|~21 - Safety~|~1B780F54BA64FCC48558FB86F758ACCE7B051361 117198~|~1~|~1~|~01/MPO~|~Primary Plan Split for STBG eligible streetscape ~|~31 - Landscaping & Other Scenic Beautification~|~531F22243AFF8CB6F1538715497705555A3723B2 125880~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MOE 556 0.00-13.135~|~05 - 4R Maintenance - Resurfacing~|~E0C46CF95D870C1986219C790E3B290D9C9577E5 95709~|~1~|~1~|~01/ERD~|~Resurfacing of Quick Road (CR-41) from the City of Cuyahoga Falls corp line to Akron Peninsula road, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~21345F97CDFC3777D4F1D5C141655816541BB469 104285~|~1~|~1~|~01/NFP~|~Pruning and Tree Cutting.~|~44 - Other~|~77BC19E3510E96C54C2F9F760EE38044A78A9B13 120286~|~1~|~1~|~01/STR~|~Superstructure replacement. MRG 376 6.02, SFN 5801680. Funded 80% Federal/20% State.~|~~|~D709BFD49F654C5C8071546ED51C5B0EEF440BB5 109494~|~1~|~1~|~01/SAF~|~Upgrade the intersection of Morse Rd at Babbitt Rd~|~21 - Safety~|~AF680E0AB369BDA5E90C28C662061BDAAC379695 101450~|~1~|~1~|~01/IMS~|~Added Plan Split description for slope repair.~|~~|~1110C319A9A9C1A052F903CB9C84FCCBDD32CA29 105244~|~1~|~1~|~01/STR~|~Resurfacing HOL-3 from SLM 0.00 to 4.46~|~05 - 4R Maintenance - Resurfacing~|~6CB3908F67D8B9B48D2A38BA98D6439EA74429D3 105244~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~8D9A9F51953A923A1B844B6E386B2667BB8B4839 86701~|~1~|~1~|~01/NFA~|~0803812 BRO SR763 0.96 Intersect: Trib Of Slickaway Run100% State 01/NFA/BR/State~|~10 - Bridge Replacement~|~2326A4B4BEC77D96E670F6D2C55977F8711C7DFC 120103~|~1~|~1~|~01/S>2~|~Shared use path on the south side of Cemetery Road from Britton Parkway to Trueman Boulevard~|~28 - Facilities for Pedestrians & Bicycles~|~5B53A086CC8302E3CEF8688E71728CE2CFC44E39 120103~|~1~|~2~|~02/S>2~|~Aesthetic items added above and beyond the requirements that will be funded entirely by the city of Hilliard.~|~28 - Facilities for Pedestrians & Bicycles~|~6E948001BDAADC5E54681C30F834BA581D558BDA 114888~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7C79F5EC8D9B56E225516FD13A85734EDE60309B 114888~|~1~|~2~|~02/STR~|~Minor bridge work~|~13 - Bridge Rehabilitation~|~9E14909A6A3C1AE057857CA429035DA1521B0201 87306~|~1~|~1~|~01/STR~|~general system resurfacing of HAS-151-4.58 to 11.12; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~D3788A2D36C1492CFB04A2B7C02C952453524B3A 96118~|~1~|~1~|~01/NFP~|~Material Storage Shed @ Wheelersburg OutPost~|~44 - Other~|~7A851F26FE02CBB55E0B1DE2085AA14ECA3B8243 94216~|~1~|~1~|~01/IMS~|~Bridge inspection on IR bridges~|~~|~B14C957539A201DE4736ECD9D2D95E82E543EAF4 94216~|~1~|~2~|~02/NHS~|~Bridge inspection on NHS bridges.~|~~|~EFB2A3A9E0E550AB08D95FAD2DEC32183EA84B9E 94216~|~1~|~3~|~03/S>2~|~Bridge inspection on Lrg Urban bridges.~|~~|~3977F67E7B602A2E2E3E2C0C92B1D922EC87C1B8 114834~|~1~|~1~|~01/STR~|~Items associated with Bridge work.~|~13 - Bridge Rehabilitation~|~484BD99C8F8477D33E7F1E662C2C44662CA083F1 97741~|~1~|~1~|~01/IMS~|~SFN 5704804, MOT-70-0334, Arlington Pike (C9)-remove and replace deficient bridge deck. Investigate semi-integral abutment conversion. Use SCC mix to patch concrete abutments, piers and wingwalls. Seal concrete surfaces. Paint structural steel.~|~~|~65E28A20D237ED1CA9409E20A44B4C324D0A3343 93468~|~1~|~1~|~01/STR~|~Rural Other Federal Aid COL SR518 mine subsidence repair near SLM 9.8~|~04 - Reconstruction - No Added Capacity~|~8D185636EB679B450A2361FFA852DA43E71D8C32 98564~|~1~|~1~|~01/BRO~|~Plan split for bridge work at 80/20 fed/state.~|~13 - Bridge Rehabilitation~|~A3E7DEFA2C57247493A5FCB2CBB9CA0E4A2CBFC8 111952~|~1~|~1~|~01/NHS~|~1 3/4" Mill and Fill with Super-pave in the City of Dayton.~|~05 - 4R Maintenance - Resurfacing~|~41279E643EF30EE85849D1CD567E941F32A04633 114057~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction costs~|~21 - Safety~|~CF4419677D2CCC6A5CC15774DBF3A1E07CF24A07 104052~|~1~|~1~|~01/S>2~|~Rehab local bridge.~|~10 - Bridge Replacement~|~B5343720771EF1843D363B971081CEE42A694CD6 124418~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement~|~44 - Other~|~A4E6C827ACA8E08A88C647D60C5A9E0CB0EFB4CD 113797~|~1~|~1~|~01/SAF~|~Installation of wrong way signs at various locations along the IR-71/IR-90 Corridors in Cuyahoga County.~|~21 - Safety~|~DEAD11AB6FD1C46C014F91CD944380045E80823B 99566~|~1~|~1~|~01/NFP~|~Repair and seal spalled abutment joint, install lateral restraint at piers and install abutment end diaphram. In the City of Canton, Stark County, Ohio.~|~13 - Bridge Rehabilitation~|~8AEE2822FD4BCA15194DC09EE5EDCC25A7E2F2E4 84977~|~1~|~2~|~02/S>2/Stow~|~Plan split to cover concrete reconstruction of approaches to Graham Road bridge over State Route 8.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4473B8DA357B8ED745ADD7934FDDE7ED2D9BFD6E 84977~|~1~|~1~|~01/CMQ/Stow~|~Widening of Graham Road (CR-29) from Bath Road to State Route 8; Adding turn lanes , traffic signal coordination, concrete slab replacement and resurfacing, Summit County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~86D978B2C1788478693F277BC56B2E8E52B818BB 113104~|~1~|~1~|~01/NHS~|~Chipseal on ADA 52~|~05 - 4R Maintenance - Resurfacing~|~9F30663AEAD0F1F9F9DCBD61AE720AFE460487C2 113104~|~1~|~2~|~02/STR~|~Chipseal BRO 756~|~05 - 4R Maintenance - Resurfacing~|~850F411059DC039B2BB653E6950D0AF4D5EEDE22 103705~|~1~|~1~|~01/NFA~|~Athens City Schools improvement project using SRTS funding. Work includes updating curb ramps and installing missing sections of sidewalk on three streets in Athens. The selected streets are between the public library and East Elementary School. Elmwood Place, Watt Street, and Hudson Avenue.~|~21 - Safety~|~191E3739DF72F115888BFD413EE8F3A1BE0AC12D 93359~|~1~|~1~|~01/IMS~|~Construct noise walls along I-270 from Broad St to Main St and Main St to Livingston Ave~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7C0C24F8478BA12CAC37BDB03F756204115A1F0 93359~|~1~|~2~|~02/IMS~|~Costs to repair damage caused by vehicle accidents~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9A1A433EE9D3822DEBBF8E9A82EC7363A5462992 118527~|~1~|~1~|~01/NFA~|~Split for bridge removal work. ~|~40 - Special Bridge~|~CB53ABAB3028C189B49E239C294CEDD558FF76E8 117330~|~1~|~1~|~01/NFA/MCEO~|~Bridge replacement of MUS-TR 118-1.01 (SFN 6044263) carrying Schoolhouse Road over Wakatomika Creek~|~10 - Bridge Replacement~|~48A98B3086BF134288A1E52F9A8BFEAABB5A5188 90241~|~1~|~1~|~01/SAF~|~Safety & MORPC CMAQ funded intersection project of Gender Rd & Refugee Rd~|~21 - Safety~|~BC52EBAFFA86B17DFD46FEC42AC4F99E92091FB4 94138~|~1~|~2~|~02/NFA~|~Resurfacing SR 282 from 0.00 to 2.69.~|~~|~4B3C0D7A52887FEDE965AE9470A045A6D490BEBA 94138~|~1~|~1~|~01/STR~|~Resurfacing POR SR 44 from 22.14 to 24.05, POR SR 82 from 9.40 to 10.62.~|~~|~490BE53B965B292FB1A033526C9990852067F49E 107525~|~1~|~2~|~02/S<2~|~Resurfacing SR 152 from SLM 6.45 to SLM 8.85~|~05 - 4R Maintenance - Resurfacing~|~E76EDEEC0CE104918BB753C2089511BF5406482C 107525~|~1~|~1~|~01/STR~|~Resurfacing JEF-152 from SLM 8.85 to 13.87~|~05 - 4R Maintenance - Resurfacing~|~479F00205091B3BBCAB00EA649146FE150532DB5 122121~|~1~|~1~|~01/SAF~|~Install roundabout.~|~21 - Safety~|~670CD9D75F6101AEBE1A49F22185DD9153C82909 122252~|~1~|~1~|~01/SAF~|~Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School.~|~28 - Facilities for Pedestrians & Bicycles~|~7E6F0A4FF79E8D47AE96659B9AFD6D40C2B1947C 107969~|~1~|~1~|~01/NFP~|~Smoothseal~|~05 - 4R Maintenance - Resurfacing~|~28BC4830314115571708184CC368C6B112FBE1CD 119935~|~1~|~1~|~01/MPO/CANT~|~Construction of new bike trail along Colonial Blvd, in the city of Canton.~|~28 - Facilities for Pedestrians & Bicycles~|~F89F51F2E4B475B52CC5945E279953CD3648A28D 124859~|~1~|~1~|~01/IMS~|~All work associated with the collision repair of bridge HAM-275-2338L~|~13 - Bridge Rehabilitation~|~7D16B8C7C22973691DEA218FF4BA142E7AB58916 125000~|~1~|~1~|~01/SAF/DEL~|~Construction of a roundabout at the intersection of US 36 and Ostrander Rd for safety purposes.~|~21 - Safety~|~AC805627C19D08B80171FDFC3342B290F5E7C355 121740~|~1~|~1~|~01/BRO~|~Rehabilitation of the Sharon Road bridge over Norfolk Southern RR and Sharon Creek (SFN: 3138011)~|~13 - Bridge Rehabilitation~|~C8C3F6F6CD059F48DD0413561F540BA65C3DA323 112656~|~1~|~1~|~01/MPO~|~Resurfacing of Tibbetts-Wick Rd from US 422 to SR 11.~|~05 - 4R Maintenance - Resurfacing~|~408155F6288FEF8810D22FCD211C3C566D39E18D 96950~|~1~|~1~|~01/MPO~|~Mill & Fill on Baumhart Road from Garfield (west) to Russia Road.~|~05 - 4R Maintenance - Resurfacing~|~3B03EA9E0256404EAE82B1D4FC283AF162F0CA88 111646~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement on various County Routes. 100% 4HB7 funding for first $300,000 then 100% LNTP for remainder.~|~21 - Safety~|~9CB95EB63933522850C27FBB2FCFFDE9227F450F 106438~|~1~|~1~|~01/S<2~|~Funding from the Small Cities program. 95% federal. The local match and any overage to be provided by the Village of Ada.~|~04 - Reconstruction - No Added Capacity~|~BC76767F83E38DA14415F0C1C8FC8CC33FD2BB6B 106438~|~1~|~2~|~02/NFP/ADA~|~Water line work on Klingler Road. No federal funds are being used for the work in this event.~|~43 - Utilities~|~1BDBC69EAE3DB8345F4B9515AE9EA0A84BBA82F3 115412~|~1~|~1~|~01/NHS~|~Bridge hit repairs.~|~13 - Bridge Rehabilitation~|~9C149FDA009408F328EE4EED2645EDF6AE56BFDE 106073~|~1~|~1~|~01/NFP~|~Replacement of conduit associated with two lighting circuits in the IR77/US30 Interchange in the City of Canton, Stark County, Ohio.~|~21 - Safety~|~8F902A2A5ACD985288C13DD1E850877AC90004D9 98342~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~56F0FCD59EECEB7D84C1D00340434C66C3F644AA 98342~|~1~|~2~|~02/NFA~|~District Preservation 4PS7 (100% State) - No CAP - Full Depth Repairs and Spot Paving on NOFAS-Rural routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~735566D449BBDCC09D69F7DD5665855C996FE0CD 98342~|~1~|~3~|~03/IMS~|~District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - Full Depth Repairs and Spot Paving on IMS routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A9A758733F5744E9D26229AC469BA598356BF852 99669~|~1~|~1~|~01/NFA~|~Correct both horizontal and vertical geometric deficiencies at the intersection of CR 22 (Sharpsburg Rd.) and TR 31 (St. Peter Rd.)~|~04 - Reconstruction - No Added Capacity~|~778DC027568D4C20882E1A4B56BDFA01C81B0536 116658~|~1~|~1~|~01/STR~|~Culvert Replacement Hocking SR 328 6.23 CFN: 1828466~|~04 - Reconstruction - No Added Capacity~|~E57524E702E355B1AFC3D917EFC6C46CFC101F14 107609~|~1~|~1~|~01/NFA~|~The City will need to complete the realignment of SR315 intersection on the northbound exit ramp to Olentangy River Rd.~|~01 - New Construction~|~68624FAA558DE0A9D15FE1D4CF61F7B4332053DF 86979~|~1~|~1~|~01/IMS~|~Earthwork, bridge removal of SFN 7705913 SUM IR 76 11.37L Over Spicer Johnston/Abandoned RR. SFN 7705948 SUM IR 76 11.37R Over Spicer Johnston/Abandoned RR. SFN 7703007 SUM IR 76 12.12R over Johnson St and RR~|~04 - Reconstruction - No Added Capacity~|~3EE538B126E1B8CB31BE6BAE428FC07C45717017 86979~|~1~|~3~|~03/NFA/Akrn~|~Replacement of approximately 200 feet of waterline in the City of Akron, Summit County, Ohio. 100% City of Akron cost.~|~43 - Utilities~|~8D1F7E12FF1F18A070003108D93A1DD0586EE857 86979~|~1~|~2~|~02/BRO~|~Plan Split for BR Eligible Bridges SFN 7703031 SUM IR 76 11.27 over Brown Street.~|~13 - Bridge Rehabilitation~|~96D944645F48C209B0DD2CE79B5840EC7742F0FD 97044~|~1~|~1~|~01/NHS~|~Two Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~08E6341F9B604E2F62D1B9F0B73B143388593A2F 97044~|~1~|~2~|~02/NHS~|~Bridge Work: WAY-250-1.20 / WAY-250-5.05 / WAY-250-7.20~|~13 - Bridge Rehabilitation~|~18CE65107A7230E683C681041B2053D2D30846F0 94633~|~1~|~1~|~01/SAF/MtOr~|~It is proposed to install a temporary traffic signal and turn lanes at the intersection of SR32 and Books Malott Road (SLM 4.15).$200,000 @ 100% state from ODOT Jobs & Commerce$169,0000 local match~|~21 - Safety~|~4897C63BFA56715D89AA30A75BC5F84EA6E7F950 125353~|~1~|~1~|~01/S5K~|~Microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1171D3838FA39817442140129A399012974BBF25 109492~|~1~|~1~|~01/IMS~|~Repair landslide~|~~|~D0FBFAA5BB92141F5339656BF718C1E3D506967A 97063~|~1~|~1~|~01/ENH~|~Transprotation Alternative Program funded project; 80% fed 4B37 and 20% local LNTP. Rehabilitation of two railroad cars: Steam Engine and Pullman Sleeper.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~36E40F8B7761FAAB0E9911929E5FD95802814301 125374~|~1~|~1~|~01/S5K~|~Pavement markings.~|~21 - Safety~|~D299ACA026A0367899D95B409F46C41E505FA3C8 120943~|~1~|~1~|~01/BRO~|~Replace box-culvert type bridge carrying SR 83 over Spring Run. In stream work will be required.~|~04 - Reconstruction - No Added Capacity~|~1C069B636EFFC83322984642D5F2345D74EDAADB 119203~|~1~|~1~|~01/BRF/TRCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~C1A724E4439151129A1EEE3B9F6A5E981F5B5CC5 93212~|~1~|~2~|~02/S>2~|~General system paving in the urban func class area:FRA-665: 7.38-9.01, 9.90-10.97, 10.99-11.61, 11.89-12.24, 12.55-12.59, 13.48-14.52~|~05 - 4R Maintenance - Resurfacing~|~3BD8340D29655C4289116A395C141D5024929B19 93212~|~1~|~3~|~03/S>2~|~Grove City urban paving in urban func class area:FRA-665: 10.97-10.99, 11.61-11.89, 12.24-12.55, 12.59-13.48~|~05 - 4R Maintenance - Resurfacing~|~65B18BCE0FD5114BD1359C83921FA47A098873C9 93212~|~1~|~1~|~01/STR~|~General system paving in the rural func class area:FRA-665: 0-7.38~|~05 - 4R Maintenance - Resurfacing~|~6A722752B0C26EB43916C53BCBFF23E293096763 112995~|~1~|~1~|~01/NHS~|~NHS conduits linked~|~04 - Reconstruction - No Added Capacity~|~64E119B7807CC48E194FDFA9D9D3671A8D6EBE38 112995~|~2~|~2~|~02/STR~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~AA04797DC67FA3BBE27223FE12ECB05483888635 86849~|~1~|~1~|~01/SAF~|~90% Federal / 10% State Safety funding split~|~21 - Safety~|~491758853625811F1A47585EDDDF70ABCCEEEF91 118981~|~1~|~1~|~01/S>2~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~EA95721F3D19BDA80440B996D1178A552E5A69C9 98831~|~1~|~1~|~01/IMS~|~Split for signal work~|~44 - Other~|~626618D7ED2B1E374F4A3C96FFC99B1BAB19C0D8 98831~|~1~|~2~|~02/SAF~|~Installation of pedestrian refuge islands at two midblock locations along SR-283.~|~44 - Other~|~B46AD2BB2AEC91B3B40C97C7B8442679F94305C9 94426~|~1~|~1~|~01/MPO/SPEN~|~Work funded with MPO-STP funds. The use of Toll Credit has been approved.~|~04 - Reconstruction - No Added Capacity~|~88161A036B557370673B88BFBF8BCC382191FF4A 94426~|~1~|~2~|~02/STR~|~ODOT District preservation funds to be used for costs associated with replacement of the surface course of asphalt on SR117.~|~05 - 4R Maintenance - Resurfacing~|~1D7644784E54F3FAF4B4213EAD29A38CBD4B3B44 114740~|~1~|~1~|~01/STR~|~JAC Chipseal FY25~|~05 - 4R Maintenance - Resurfacing~|~F103ADB7C9182AEAD42F6D4CD0788395BD21618B 117438~|~1~|~1~|~01/STR~|~Bridge Replacement (SFN 5132339)~|~13 - Bridge Rehabilitation~|~BF2130F2A74E26CB1F57284B0978311A7F11960A 100563~|~1~|~1~|~01/STR~|~Resurfacing on CLE SR 756 0.00 to 2.70 & 7.38 to 11.19~|~05 - 4R Maintenance - Resurfacing~|~1C6DE834E2A85C9F13114888EE802FFE63C7C28E 100563~|~1~|~3~|~03/STR~|~Plan Split for the 3 culvert replacements in the project~|~04 - Reconstruction - No Added Capacity~|~3BC04A9450E14219BA7DDB292CBB553FD51E95C5 100563~|~1~|~2~|~02/STR~|~Edge replacement on CLE SR 756 SLM 2.70 to 7.38 using Major 2 funds~|~05 - 4R Maintenance - Resurfacing~|~A5684DD5AC1E86074DB8EC539C9AFB89DBACEF3B 100563~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~4F490A6766EFDAA9640466515DC34421C99422E5 91864~|~1~|~1~|~01/S>2~|~STP Urban split for pavement on SR 747 between SLM 6.06 to 7.92.~|~05 - 4R Maintenance - Resurfacing~|~6BD43169FDDF906533970354BE172ABE89FBA19F 103444~|~1~|~1~|~01/IMS~|~Repair existing steel beams by heat straightening for BEL-70-1572 (SFN 0702498)~|~13 - Bridge Rehabilitation~|~A318F3EB922AE9A358D4584E2F9FD17DB64A99A9 124232~|~1~|~1~|~01/ERD/KENT~|~Installation of EV charging stations.~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~A4F40AC7130094353B90027F5F1AC354C8841786 99648~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~3E2FBB879C58911FA69A9FA5B5125FAAB71B4A50 101727~|~1~|~1~|~01/ENH~|~01/ENH/OT/TUSC - For TAP eligible work at 95% Federal 5% Local; Federal share includes 15% TRC.~|~28 - Facilities for Pedestrians & Bicycles~|~E56BCB4E5B43FBCAE12AC37CA6BA035DFA3051FF 92438~|~1~|~3~|~03/NHS~|~Geotech $'s to repair embankments along various placed on US-35~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1B87BA793339718139225621C52F715308F07486 92438~|~1~|~2~|~02/STR~|~D6 $'s for Drainage and intersection improvements on SR-435 from SLM 0.97-2.3702/STR/OT/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~50994C8F4A45F2955F184AC66E7D8627663A3303 92438~|~1~|~1~|~01/STR~|~D6 $ for Full depth concrete replacement on SR-435 between I-71 and US-3501/STR/PV/~|~04 - Reconstruction - No Added Capacity~|~6045C01F1146D832A6BF44BBDAF3811427BFF2CE 92438~|~1~|~4~|~04/STR~|~Geotech $'s to repair embankments at various places along SR-435~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~84B65D3AC232E20DD9B71DCF0B451CDD962CC74C 92438~|~1~|~5~|~05/STR~|~D6 $'s to replace deck & beams on SFN 2400391, FAY-435-1.05R, over Rattlesnake Run~|~13 - Bridge Rehabilitation~|~F3CB5E3083551010BC700369BD210F7D25105189 92438~|~2~|~6~|~06/STR~|~Part 2 Mill & fill SR 435 from 2.37 to 4.08~|~04 - Reconstruction - No Added Capacity~|~D7E00E06AD26EDE964C1DCF3659B956C3945E98A 98162~|~1~|~1~|~01/ENH~|~Project will fill all cracks on bike paths, sealcoat all asphalt sections of paths with an approved agricultural bio-based 101-Agril-Road treatment product, and perform full depth repairs as needed.~|~28 - Facilities for Pedestrians & Bicycles~|~2214B1A557D20EDE144AB05F5F45F5FC224A683F 96166~|~1~|~1~|~01/NFP~|~Facilities project~|~44 - Other~|~731334C98C81E7139772EDD2E27C2530CEFEAAA0 109329~|~1~|~1~|~01/SAF~|~District 5 Safety Program Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - See CAP Comments - Intersection improvement at US 62/Beech Road.~|~21 - Safety~|~269672E76ABF2B04175746943CFB314016C4B29B 109329~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~289668066C2C645B8507C6985C6171BEFDBFAA22 106159~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 16.62. DSR MRG-006. Rural other federal aid funded 80 federal/20 state. ER funds.~|~~|~A16B17463CC0C822AB3F8E0D5DFFDB3AD0CD487F 106159~|~1~|~2~|~02/STR~|~Replace culvert MRG 78 16.63 with 80% Federal and 20% State Preservation funds.~|~~|~D43723E4D69BC39B990039B3CB6B30A4B7381405 102814~|~1~|~1~|~01/NFP~|~All work in projects. 100% state funds from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~FAB716C95BF8DE4725BB44F2BFFBD4D68EB26659 102814~|~1~|~2~|~02/IMS~|~Collision repair work on bridge hit along IR 75 at Bible Road. ~|~13 - Bridge Rehabilitation~|~22957EB7FEFF5B90AD8A55B9129F42879C901B09 113368~|~1~|~1~|~01/IMS~|~Place epoxy overlay on Sawmill Rd structure over IR 270~|~13 - Bridge Rehabilitation~|~FB932C3288669A8E1D8F44EFC27529CA91E03367 92337~|~1~|~1~|~01/ENH~|~This split is for work eligible for Transportation Enhancement (TE) funds. The federal TE funds are from the Central Office controlled TE program.~|~28 - Facilities for Pedestrians & Bicycles~|~E7EA25A6A3A2AE6CD35F41339F3C423094E08A78 112868~|~1~|~1~|~01/IMS~|~FRA-70 from 0.00 to 3.41~|~05 - 4R Maintenance - Resurfacing~|~0F72079BF29C924C15D3D856DE8277A274AB0C30 108630~|~1~|~1~|~01/IMS~|~Deck Patching Split~|~13 - Bridge Rehabilitation~|~56005B8F42C4976C22E9B73867AC3A558F420CCB 123042~|~1~|~1~|~01/IMS~|~Drainage Block PID.~|~99 - State Preventative Maintenance~|~8D43EC79B479799985D45EB195661C45F358332B 119165~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. VIN 160 3.71-18.118 and VIN 349 0.004-1.262.~|~05 - 4R Maintenance - Resurfacing~|~5863004BE789E0DA6724AAB9805C469B12589066 119165~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. VIN 160 18.118-18.725.~|~05 - 4R Maintenance - Resurfacing~|~33CAE15F74C093282F58C0F5B4FE9647F45EEF6A 106095~|~1~|~2~|~02/S>2~|~100% City of Columbus funding split.~|~05 - 4R Maintenance - Resurfacing~|~8C5ADCE5D1E815E85A634C5140392985FC88065A 106095~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-23-15.30-16.56~|~05 - 4R Maintenance - Resurfacing~|~D6422D1441F8D6DA9441CA671C5E602D3D85AECE 104800~|~1~|~1~|~01/IMS~|~Plan split for barrier and lighting work~|~21 - Safety~|~DCEBA82312B5799EED96F80643A953E0DB071303 115054~|~1~|~1~|~01/BRO~|~Plan split for programming project, update at project scoping.~|~10 - Bridge Replacement~|~C5E729486D6652852EFB8BBC70C2FB075EA63F5A 100170~|~1~|~1~|~01/IMS~|~Various major bridges in D-2~|~13 - Bridge Rehabilitation~|~E33484D62982D67F16469B8577A9C1E7D5C3288B 77240~|~1~|~1~|~01/BRF~|~Bridge Replacement with Morrow CountySFN 5930154, MRW-CR146-0.43 over Whetstone Creek01/BRF/BR/~|~10 - Bridge Replacement~|~00B39A3F87CCAF93BC93F0F5C4974C23B27BB530 107704~|~1~|~1~|~01/STR~|~Resurfacing on US 127 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~4F2876846E26A741C39DB9E5D9F8DEC4DC98CEC7 93968~|~1~|~1~|~01/IMS~|~Widen and extend exit ramp from IR-275 SB to SR-32 EB including necessary improvements to Old SR-74 structure over IR-275. Relocate Old SR-74 to intersect SR-32 at Bells Lane. Reconstruct SR-32 from west of Mt. Carmel Tobasco to west of Aicholtz (meet Phase 1 improvements).~|~03 - Reconstruction - Added Capacity~|~27563ACB1C9AA5A4CBB42373ECDB52F01A59F628 109594~|~1~|~1~|~01/BRO~|~Major rehabilitation of Hilliard Road Bridge (SFN 1830147) over the Rocky River utilizing federal-aid~|~13 - Bridge Rehabilitation~|~C79D180A2005BB3B43F1ECDF7AB3486FA2708D79 95196~|~1~|~1~|~01/IMS~|~Field pave invert of steel culvert with concrete on SFN 1206532 CLA 675 0102.~|~44 - Other~|~1637555044A2A03DAF5C3C4A6485CCB939706F44 95196~|~1~|~2~|~02/STR~|~Field pave invert of steel culverts with concrete. SFN 1901745, DAR-118-1450.~|~13 - Bridge Rehabilitation~|~EB1652A4ECA78645DB082262C978CA9DC9491392 91828~|~1~|~1~|~01/S<2~|~Pavement planing adn resurfacing with asphalt concrete in Sidney on SR 47 from East side of the bridge over I 75 (SLM 14.05) to Fourth Street (SLM 14.42).~|~05 - 4R Maintenance - Resurfacing~|~050175B2724517B343BC1A2595CF9715AD9C783D 90812~|~1~|~1~|~01/MPO~|~Upgrade traffic system central software and hardwar; upgrade all traffic signal controllers; upgrade conflict monitors with central system communication capabilities; replace all cameras with upgraded cameras and improved camera communications; upgrade school flashers with LED's; introduce fiber optic redundant links; retrofit traffic signal cabinets with UPS; and retrofit curb ramps per ADA requirements in the City of Kettering.~|~44 - Other~|~F5ED5769582311AA8B9F3332A261601A64F9582C 113910~|~1~|~1~|~01/BRF~|~CEAO Funds~|~10 - Bridge Replacement~|~81FBC5F3DBC881AF29FAB4F09D0FBC6CF1B3A978 116180~|~1~|~1~|~01/IMS~|~Plan Split for work associated with IR 70~|~21 - Safety~|~B0CE977D7C6FD0366F0BE8C1D9EEF9644C91C3DB 117175~|~1~|~1~|~01/STR~|~Split for pavement work~|~05 - 4R Maintenance - Resurfacing~|~B5F730FF0B6D214C95CCFC613CE05DE289AB66EB 122907~|~1~|~1~|~01/NHS~|~Major rehabilitation of US 22 in Harrison County~|~04 - Reconstruction - No Added Capacity~|~FA4FE5377C75780CEB2B018E2F0B0093074C48E1 122907~|~1~|~2~|~02/BRO~|~Rehabilitation work for all structures on US 22 within the project limits~|~13 - Bridge Rehabilitation~|~E58CF13BEECEE01D851851D164FBDDB466D92E68 113582~|~1~|~1~|~01/IMS~|~Plan split 1 for GSM funding for slide repair~|~44 - Other~|~68BA11B37BA6CDA223CB8770A874080ACBDA9513 93645~|~1~|~1~|~01/STR~|~Work on SR 109 in Putnam County from SR 613 to the Henry County line, SLM 5.89 to 11.03. Work on SR 65 in Putnam County from the south corporation limits of the Village of Leipsic to the Henry County line, SLM 15.58 to 22.90. Work on SR 613 in Putnam County from SR 15 to CR 7, SLM 7.26 to 18.46. State and federal funds from the District Preservation Program Budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~C5506FF557F72109A333E777DD20DB7B36E0C3E7 114061~|~1~|~1~|~01/S<2~|~Mill and fill multiple locations (4B97 Small City Program to provide 95% of the eligible costs, up to a maximum of $1,235,500)~|~05 - 4R Maintenance - Resurfacing~|~362E82E7099D0099CE3C02810720A6B19A28E786 95199~|~1~|~1~|~01/STR~|~Install new and upgrade existing pavement markings on various county roads.~|~21 - Safety~|~7F757869717E53C0DB84CB4D4455C1083C2B2F38 109251~|~1~|~1~|~01/NFP~|~Spot paving on various routes within ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~EDD69FB1D9B095D13D4A1CDB90D62D131815995C 116323~|~1~|~1~|~01/IMS~|~Plan split for the resurfacing on GRE-675~|~05 - 4R Maintenance - Resurfacing~|~3F0D65A3D3EE97281D8D0FA3FEAB3D90B7EFFDAA 110015~|~1~|~1~|~01/STR~|~resurfacing on PRE-40~|~05 - 4R Maintenance - Resurfacing~|~BDEBF23A8B491799A08424C739552EE2427083EB 111657~|~1~|~1~|~01/SAE~|~Install roundabout at intersection of US-68 and SR-235~|~21 - Safety~|~0A475BAA181ABF29C1D80ACAC4C6B7BF3FA71C13 111657~|~1~|~2~|~02/SAF~|~Greene County Water and Sewer work~|~21 - Safety~|~B99B09EA74EEC633776A12587552445C0AD40167 97796~|~1~|~1~|~01/IMS~|~SFN 5500753, MIA-41-1124 over IR 75 - Replace deck and convert to semi-integral abutments. Patch abutments using-SCC concrete w/anodes. Seal Concrete Surfaces. Re-use exisitng decorative vandal protection fence. Moment plate & splice plate retrofits complete.~|~~|~0BA60EED72D0F4B2867C63BD81D0F650D07E3EFA 103519~|~1~|~1~|~01/S>2~|~FY2020 Urban Paving for the City of Hamilton on SR 129. The limits are 14.35 - 14.71 - SR 129. This plan split is for the items paid at 80% ODOT and 20% City on the STP > 2 route mainly consists of planing, new asphalt overlay and final striping.~|~05 - 4R Maintenance - Resurfacing~|~037A29B7E5E6014108445F73C9EB7889949C92D3 103519~|~1~|~2~|~02/S>2~|~FY2020 Urban Paving for the City of Hamilton on SR 129 within the City of Hamilton. The limits are 14.35 - 14.71 - SR 129. This Plan Split is for the items paid at 100% City on the STP >2 route, mainly consists of pavement repair, MOT striping, utility work, curb & gutter and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~D88684BF9573837F63DF054232DDFC3687362330 98308~|~1~|~1~|~01/NFP~|~Guardrail ding and dent repair contract in Franklin County~|~44 - Other~|~A49A3465951779426B8D93C4F3B84B34FFC511F5 101949~|~1~|~1~|~01/STR~|~Bridge maintenace to linked structure.~|~~|~14A77E096047D803406ACBEC88B87B1A3907E982 109595~|~1~|~1~|~01/IMS~|~IM plan split~|~05 - 4R Maintenance - Resurfacing~|~47CCB81B3FD9F33F1276A05D8A1286D818F22D1B 126937~|~1~|~1~|~01/SAF~|~Safety project to construct a single-lane roundabout at Mink St SW (CR 41) and Palmer Rd SW (TR 36) in Licking County.~|~21 - Safety~|~2D2B0FEFFEA99F18FF7AE1BA3EB68115773F229C 120771~|~1~|~1~|~01/MPO~|~to be used for construction of two roundabouts, multi-use path and sidewalk along West Elkton Rd. in Hamilton~|~21 - Safety~|~928AA83231A71645997CE35218A75C6F5D43C2F6 98571~|~1~|~3~|~03/S<2~|~STP<200000 Urban Paving - 80/20 Fed/CityRIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - DRIVING LANES RIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - PASSING LANES RIC-42-10.90 (42D, 13S, 1st St) to 10.98 (Diamond St.) RIC-42-10.98 (SR13, S Diamond St) to 11.38 (Park Ave, SR430) RIC-42D-0.00 (US42, Hedges, 2nd St) to 0.11 (S. Adams St) RIC-13S-0.92 (2nd St/Mulberry St) to 1.04 (US42D, Main St) RIC-430 5.69 (Park Ave, US42) to 6.01 (SR39, E. 5th St)~|~05 - 4R Maintenance - Resurfacing~|~B81D1E3C050379BD1F3D9A3080EC1A639F1AB631 98571~|~1~|~5~|~05/MPO~|~Pedestrian Island. MPO 80% 4TC7 20% Local~|~21 - Safety~|~C138A0DCCAEDCC0F36F81C3F84E9AAD682879A37 98571~|~1~|~6~|~06/MPO~|~Fabric on the outside lanes of the US42 southern section (south of the SR13 intersection)~|~05 - 4R Maintenance - Resurfacing~|~E2971937382BDA245F8B8D13D39919C8FBF8D861 98571~|~1~|~1~|~01/NHS~|~NHS Urban Paving - 80/20 Fed/CityRIC-42-10.66 (Main St) to 10.90 (42D, 13S, 1st St)~|~05 - 4R Maintenance - Resurfacing~|~2FDACB6E660D64C10A78B2E0F4FA6D7C15E0684B 98571~|~1~|~4~|~04/S<2~|~STP<200000 Urban Paving - 100% LocalRIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - DRIVING LANES RIC-42-7.84 (Kroger Entrance) to 10.66 (Main St) - PASSING LANES RIC-42-10.90 (42D, 13S, 1st St) to 10.98 (Diamond St.) RIC-42-10.98 (SR13, S Diamond St) to 11.38 (Park Ave, SR430) RIC-42D-0.00 (US42, Hedges, 2nd St) to 0.11 (S. Adams St) RIC-13S-0.92 (2nd St/Mulberry St) to 1.04 (US42D, Main St) RIC-430 5.69 (Park Ave, US42) to 6.01 (SR39, E. 5th St)~|~05 - 4R Maintenance - Resurfacing~|~01F758A75E950AD3485F6EBCD3EAB5879C94A6B9 98571~|~1~|~2~|~02/NHS/MANS~|~100% City of Mansfield ItemsRIC-42-10.66 (Main St) to 10.90 (42D, 13S, 1st St)~|~05 - 4R Maintenance - Resurfacing~|~095A45A3620FB8D834FA70421BBF6DB5BDAC520E 110097~|~1~|~1~|~01/NFP~|~RPM Plan split~|~21 - Safety~|~26DD5F4251C82707B3D063FE925981552F94555C 92345~|~1~|~2~|~02/NHS~|~General system paving, federal/stateFRA-317: SLM 10.04-10.58~|~05 - 4R Maintenance - Resurfacing~|~13A8E9AE19E4003928F7EA0199303BC9A7BF0F21 92345~|~1~|~5~|~05/NHS/COL~|~100% Columbus funding for curb ramps, pvmt repair, ped signal items~|~05 - 4R Maintenance - Resurfacing~|~27CE00B9D9C5560765431AFD5EB99BCB5E8F57A5 92345~|~1~|~4~|~04/IMS~|~Bridge deck sealing and patching, 90% fed/10% state2516500 FRA IR70 12.42 Intersect: Over I-70~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~680C021331E6658A33989AF8E075CE410A3E559D 92345~|~1~|~1~|~01/NHS/COLS~|~Columbus urban paving, federal/local fundingFRA-317: 9.01-10.04, 10.58-10.72, 12.12-13.46~|~05 - 4R Maintenance - Resurfacing~|~797DE4764D3FA840A47BE1B4437735DF5F413C1A 92345~|~1~|~3~|~03/NHS~|~Bridge deck sealing and patching, 80% fed/20% state2516381 FRA US33 9.14 Intersect: Over Us-332516411 FRA SR317 10.57 Intersect: Big Walnut Creek2516470 FRA SR317 12.23 Intersect: Over Ns Rr & Truro Sta Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~954BEDEC90E13E62BDA3641119729D219950C879 94137~|~1~|~1~|~01/STR~|~Bridge maintenance on SFN 5006163 MAH SR 626 0.22 over Yellow Creek.~|~~|~5980448FB6C0C1041A1A65D421B48F27D78B6C36 94137~|~1~|~3~|~03/S>2~|~Resurfacing MAH SR 626 from 2.26 to 3.51.~|~~|~C3CDD3194F67DA160D3A650AE5B4D2B5472DFDF8 94137~|~1~|~2~|~02/STR~|~Resurfacing MAH SR 626 from 0.00 to 1.09 and 1.18 to 2.26.~|~~|~E42183FDAE53C118D0ABDB366396086BEB84AF7B 119800~|~1~|~1~|~01/SAF~|~Safety Funded Plan Spit - 90% 4HJ7 and 10% Local~|~28 - Facilities for Pedestrians & Bicycles~|~6F366C74D8B436B8EBA115574D3C7137EB0B5E93 119800~|~1~|~2~|~02/SAF~|~Plan Split for Carbon Reduction funded scope items, which were applied for through the Transportation Alternatives Program and Safe Routes to Schools programs.~|~28 - Facilities for Pedestrians & Bicycles~|~D0B80E555E6A9A658AC5111A00051642C2CBB318 119227~|~1~|~1~|~01/STR~|~Plan split for project to repair bridge size Culvert CLE-133-1324 over Town Run in the Village of Bethel by replacing a portion of the top slab and patching deteriorated areas of concrete.~|~~|~55631A635C1A8C281CE3D7E8A1D9456D79E9CAFE 125839~|~1~|~1~|~01/SAF~|~Guardrail maintenance in D8~|~21 - Safety~|~E905EEFB13C8FED6F2A7F41B53868054FB41FBD5 108101~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS route bridges.~|~13 - Bridge Rehabilitation~|~BADC72AAB12A6135E1DD3B0AA41CDBA48E9DF007 108101~|~1~|~2~|~02/S<2~|~Bridge rehab on small urban route bridges.~|~13 - Bridge Rehabilitation~|~7904E5E507D60A1AC7067008CEC78957117E752B 108101~|~1~|~3~|~03/STR~|~Bridge rehab on rural route bridges.~|~17 - Construction Engineering~|~E373E49F5B75DEC9FA7AAE2B366E596BC895F523 126080~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~3E9B481DD2E22E7F7A70E632C5FAC9DD1A49AFB2 115487~|~1~|~1~|~01/NFA~|~Replacement of a single span bridge over Little Raccoon Creek on VIN CR 25 0.19, SFN 8231346.~|~10 - Bridge Replacement~|~E8D2EF401550AC2B1FAA7B90A87FA0C4AEB0F8C2 92603~|~1~|~1~|~01/STR~|~80/20 fed/state funding split fo all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~6256446D24B622FEDC0278222510279841A8748E 123452~|~1~|~1~|~01/STR~|~Resurfacing SR 164~|~05 - 4R Maintenance - Resurfacing~|~6D93DB6394F053A58EEE848138B9E19491BC7F87 123452~|~1~|~2~|~02/NFA~|~Resurfacing SR 524~|~05 - 4R Maintenance - Resurfacing~|~69A730C9C928D50880050A9FDFB06C8A745D2CA6 110817~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project. Work includes pavement removal and minor guardrail work. GAL SR 735 0.00-1.41 and GAL 7 26.05-26.25. 100% Federal Ear Mark funds, SAC 4R47.~|~05 - 4R Maintenance - Resurfacing~|~BB2CB2D6BBCB37F49E88442C30938C5879C95301 86718~|~1~|~2~|~02/S<2~|~Urban Paving - 80/20 - District Allocation/City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~0D52795CB1783971EB78529045223FC91FFD085F 86718~|~1~|~3~|~03/S<2~|~100% City of Ashland Items~|~05 - 4R Maintenance - Resurfacing~|~18EBBF07276F40452E5719B204086315D514B345 86718~|~1~|~1~|~01/STR~|~Resurfacing not withing City of Ashland Corp Limits~|~05 - 4R Maintenance - Resurfacing~|~B14D611BC6A3A125A69B0A099A70E44AB13784BD 107055~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - NO CAP - Annual Project for the Application of Epoxy Pavement Markings District Wide.~|~21 - Safety~|~9EC7B934B3B3981549011C633D2373C4C11DF8B2 93020~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Cos-US 36-26.41 to 33.59~|~05 - 4R Maintenance - Resurfacing~|~A1BDDFE980E2B43919D67A374DB1976383AF9F73 97337~|~1~|~1~|~01/STR~|~RIC-545-04.72 Culvert Replacement~|~44 - Other~|~8FF9C4B096756BD6F2B206B23F367196F8FFF9AB 124218~|~1~|~1~|~01/STR~|~STP Rural Bridge Split.~|~13 - Bridge Rehabilitation~|~D4EB41997D4B54D77E91ED69D0B2089F9AF354A0 124218~|~1~|~2~|~02/S5K~|~added plan split for STP 5K-49999 bridge SFN 7103301 (ROS-50-19.26) ~|~13 - Bridge Rehabilitation~|~1A633E5A03C4D8A8C8AA5348B320B323CF6588D7 127159~|~1~|~1~|~01/NFA~|~Paving and pavement markings for Noble County Various Roads~|~04 - Reconstruction - No Added Capacity~|~9A7804BDD067C641590E7F283EA716341B1CBC2E 105393~|~1~|~1~|~01/S<2~|~CO S<2 CV plan split established.~|~44 - Other~|~3A35A77CDF1C891184EEABD3B92147AC3F4FED8B 105393~|~1~|~2~|~02/NHS~|~Culvert repair on NHS route.~|~44 - Other~|~07203226BC898079CBB09C417D5744AC57C2715E 105393~|~1~|~3~|~03/NFA~|~Culvert repair on non-Federal Aid System.~|~44 - Other~|~032CDBC2A6749B89E1319C7AAE4FE55697A443D9 117988~|~1~|~1~|~01/BRF/BCEO~|~Replacement of Bridge TR 210 0.62 (SFN: 0933511) on a modified alignment.~|~10 - Bridge Replacement~|~369B2866F112568E293221C73CA51D60C8CB9037 100553~|~1~|~1~|~01/S>2~|~Plan for the Urban portions of US 22 and Sr 48 that are not NHS routes. These are WAR-48 between SLM 5.23-6.63 and WAR-22 between SLM 5.37-12.75~|~05 - 4R Maintenance - Resurfacing~|~7A34061ECC8C069B7B3EFB826705BD0357E017F4 100553~|~1~|~2~|~02/NHS~|~Plan Split for the NHS portions of SR 48 and US 22. These locationsa re WAR-48 between SLM 6.63-10.08 and WAR-22 between SLM 2.57-5.37~|~05 - 4R Maintenance - Resurfacing~|~AC206572C5FE6E55AD3EF5D9D42C44FC8FAE2E1D 100553~|~1~|~3~|~03/S>2~|~This plan split is for Urban bridge work.~|~47 - Bridge Preventive Maintenance~|~0C93C87CA470FC5ABEFA76DDBD097340635C9699 100553~|~1~|~4~|~04/NHS~|~This plan split is for NHS bridge work on this project.~|~47 - Bridge Preventive Maintenance~|~483FDB763F683BD18BBFDFCFD182D3EA18E695DD 100553~|~1~|~5~|~05/NHS~|~Plan split is for replacing attenuators on the NHS section.~|~21 - Safety~|~CFEAD72D0D5F0110309DDBEC3A08C22697F30B6E 105870~|~1~|~1~|~01/STR~|~funding came from CEAO - CSTP funds transferred from project 85313, Possum Run Rd.~|~05 - 4R Maintenance - Resurfacing~|~42D946ED224B5A837F34D9920025A11221932EEB 105870~|~1~|~2~|~02/S<2~|~STP Urban~|~05 - 4R Maintenance - Resurfacing~|~26BBA5DCC8EC77CA538A92187B7BE4CF1816DC1A 105870~|~1~|~3~|~03/NFA~|~Non-federal aid on minor collector~|~05 - 4R Maintenance - Resurfacing~|~DD932CBC6A95F29DDC987E7A702090F1F96DBAA6 105870~|~1~|~4~|~04/NFA~|~Non-federally aided portion in corp limit.~|~05 - 4R Maintenance - Resurfacing~|~95E07B0F81CAD17CC010B3E2768AE61E9EB3B449 105870~|~1~|~5~|~05/NFA~|~Portion of Lex-Springmill that is non-eligible.~|~~|~D2EBA9C9671295DF8A2EDF0D506BE3138F94A626 102579~|~1~|~1~|~01/S<2~|~THE DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work inside urban areas but outside the cities using STP funds. Work on SR 18 in Hancock County from Fostoria Urban area boundary at 6.46 to the west corporation limits of the City of Fostoria at 6.82. Work on US 68 in Hardin County from the north corporation limits of the City of Kenton at 10.61 to the Kenton Urban Area boundary at 11.06. Work on SR 66 in Allen County from the Delphos Urban Area boundary at 10.14 to the south corporation limits of the City of Delphos at 10.49. Work on SR 117 in Allen County from the Lima Urbanized boundary at 10.75 to Seriff Road at 12.73. District Preservation Program funds. No local funds.~|~17 - Construction Engineering~|~4CD4275994757DBAA1B394844832EB9898496B92 102579~|~1~|~2~|~02/STR~|~THE DESCRIPTION NEEDS TO BE REVIEWED AND REVISED. Work using rural STP funds. Work on SR 18 in Hancock County from the Wood County line at 0.00 to the Fostoria Urban Area boundary at 6.46. Work on US 68 in Hardin County from the Kenton Urban Area Boundary at 11.06 to the south corporation limits of the Village of Dunkirk at 19.22 and from Washington Street in the Village of Dunkirk at 19.60 to the Hancock County line at 21.80. Work on US 224 from the Indiana State line at 0.00 to TR 77 at 9.26 and from US 127 at 15.85 to the Putnam County line at 25.72. Work on SR 81 in Van Wert County from the east corporation limits of the Village of Elgin at 17.51 to the Allen County line at 21.87. Work on SR 67 in Wyandot County from TR 121 at 18.30 to SR 103 at 25.86. On SR 103 in Wyandot County from SR 119 in the Village of Cary at 7.62 to SR 53 at 12.41. Work on SR 231 in Wyandot County from SR 67 at 20.53 to the Seneca County line at 22.95. Work on SR 66 in Allen County from the Auglaize County line at 0.00 to the Delphos Urban Area Boundary at 10.14. Work on SR 117 in Allen County from the west corporation limits of the Village of Spencerville at 2.01 to the Lima Urbanized Boundary just west of SR 501 at 10.75. Work on US 224 in Putnam County from the Van Wert County line at 0.00 to east of Ralph Street in the Village of Kalida at 12.13. Work on SR 114 in Putnam County from the north corporation limits of the Village of Kalida at 7.58 to US 224 at 8.49. District Preservation Program funds.~|~05 - 4R Maintenance - Resurfacing~|~5067B72ECF5F651A2DF506E59740E05BA6C2E183 102569~|~1~|~1~|~01/STR~|~Work on SR 116 in Van Wert County from SR 117 at 2.51 to the Van Wert Urban Area boundary at approximately 17.85.~|~05 - 4R Maintenance - Resurfacing~|~D854C9CE1333D582E8CACF89B1BB87546FD500E5 102569~|~1~|~2~|~02/S<2~|~Work on SR 116 in Van Wert County from the Van Wert Urban Area boundary at approximately 17.85 to Middle Point Road at 18.15. All funds are from the District Preservation Program budget. There are no local funds.~|~05 - 4R Maintenance - Resurfacing~|~3B872FB59854199AA8752A84BA26F493121FCD92 105385~|~1~|~1~|~01/STR~|~Smooth seal on rural route: LOG SR 508 SLM 1.29 to 9.46~|~05 - 4R Maintenance - Resurfacing~|~4E8076D364917B02A39D73040A64B2EED9F09135 105385~|~1~|~2~|~02/NFA~|~Smooth seal on Non-Federal route: LOG SR 720 SLM 0.00 to 3.15~|~05 - 4R Maintenance - Resurfacing~|~773A889050CF089231386AFF3B2A7C164BF9D5C6 105385~|~1~|~3~|~03/S<2~|~Smooth seal on small urban routes: LOG SR 720 SLM 3.15 to 5.39~|~05 - 4R Maintenance - Resurfacing~|~05FC61B6252F859CBA9E1B951F4C66C690D3C889 78245~|~1~|~1~|~01/IMS~|~Interstate resurfacing from SLM 0.00 to 3.94~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0DE02A1247C5A4D709D2BCA6D870940EE72DDF08 78245~|~1~|~2~|~02/NFP~|~Cost of delivering grindings from pavement planing operation to odot county garage.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DB84115BCE2F879C3BEA61973159BCB8C75AD8E2 121655~|~1~|~1~|~01/S50~|~Abutment rehab~|~13 - Bridge Rehabilitation~|~CA88419423B8AA4FD5117B42384DD0D10FB6536F 102559~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. HOC 664 15.15-15.90. Urban federal aid system funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~0F555E2F98E136C3A9AF24052444960340D288BF 102559~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using asphalt overlay treatment. HOC 328 1.75-5.93 and VIN 93 7.47-8.75. Rural federal aid system funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~9579C827E53939B9EEB7F72B239D1ABF727C2C44 102559~|~1~|~3~|~03/NFP~|~Hocking Full Service Maintenance Facility parking lot paving. Funded 100% State LBM7.~|~05 - 4R Maintenance - Resurfacing~|~F701F5CD59FE44D62D00751E8AEF6B3FCA583EDE 99952~|~1~|~1~|~01/NFP~|~Split for all structures using state bond funds.~|~47 - Bridge Preventive Maintenance~|~FAEADA63499BBB48E5BDB7FFFC594158103EA5B8 124953~|~1~|~1~|~01/MPO~|~OKI resurfacing program eligible expenses~|~05 - 4R Maintenance - Resurfacing~|~75F07183AFC0F5866628D414EB32551BFF80B5A0 104979~|~1~|~1~|~01/IMS~|~Reconfigure lane assignments.~|~04 - Reconstruction - No Added Capacity~|~BEE395E3D452FD45965CA708D162A74AE3049BE2 110345~|~1~|~1~|~01/SAF~|~CEAO Safety funds plan split~|~21 - Safety~|~9532BFA1AEBF16926D5CA79280FF1560893A266A 105684~|~1~|~1~|~01/SAF~|~plan split for sidewalk addition along US 42~|~21 - Safety~|~3F9C820213DF3B57BF3581B6E56B796E8A9E51C2 105684~|~1~|~2~|~02/SAE~|~RRFBs to be installed at 100% Safety funds.~|~21 - Safety~|~C6EA972444BAAB15E0F01B9775ABE52BFD02EB51 112280~|~1~|~1~|~01/NHS~|~All work in the project. Funding was secured through PROTECT funds. ~|~66 - Resilience Improvement - Highway Project ~|~16AC2AD28C0BCAFB807275EB3295FED2145FD4FF 88831~|~1~|~2~|~02/NFP~|~For work in the rest areas. Rest area funds SAC 4BR7 from ODOT Central Office.~|~~|~4A6F37DBA5805000E9E5AFC6AABC17944AC48B46 88831~|~1~|~1~|~01/IMS~|~Work on the interstate system. All work in this project is in this split except for work in the rest areas. All funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~FC0EFCB091270928FB0C1DBE4A543591C141A680 93041~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing with related work on Gue-SR 146-09.92 to 10.56~|~05 - 4R Maintenance - Resurfacing~|~295984237D4B631AF01AC5FC743CF5C94E674770 93041~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Gue-SR 146-00.00 to 09.92~|~05 - 4R Maintenance - Resurfacing~|~69CBA050A6F060CAC5C177CECB32BA46ABFFF630 103544~|~2~|~2~|~02/NHS~|~Mill and fill mainline from 14.60 to 30.32~|~05 - 4R Maintenance - Resurfacing~|~DDAD20998EFD01EC8CCA93C0B29113DA8842C61C 103544~|~1~|~3~|~03/NHS~|~Work on structures: WAY-250-17.31 & WAY-250-18.15~|~47 - Bridge Preventive Maintenance~|~9C9B34D483CFD6D6A77F61A8A35CFC7BD3DABC05 103544~|~1~|~1~|~01/SAE~|~Mill and Fill Buggy Lanes (slm 19.31 to 26.65/27.18 to 30.32)~|~05 - 4R Maintenance - Resurfacing~|~BD20F990CC6A3AD0396EE11DAAADF3546A7531FB 103544~|~1~|~4~|~04/SAE~|~Safety funds for replacement of Type A End Anchors~|~44 - Other~|~8E81E2D1C8A0B16DEEE782372E14B82DEE63BAAE 123844~|~1~|~1~|~01/IMS~|~Repair FRA-71-17.013 structure and MRW-288-0.073 structure~|~13 - Bridge Rehabilitation~|~AC2ADB69F1ED04870895DCC9C9D253582F37F7A9 111255~|~1~|~1~|~01/NFA~|~ODNR - resurfacing inside ODNR park~|~05 - 4R Maintenance - Resurfacing~|~46736675F041ED069D93B3FE95BC00529022C6FE 118229~|~1~|~1~|~01/SAF~|~Plan Split for Safety funds~|~21 - Safety~|~F2A21CFCEBAB2331ED199CB20AD1EFB1CA61C26E 124407~|~1~|~1~|~01/STR/SOME~|~Pedestrian improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~310095AB10D772A39955C0412AEC68D3E0C7E85A 97124~|~1~|~1~|~01/BRF~|~The replacement of SFN6834841.~|~10 - Bridge Replacement~|~309E7FA0CB973CCB4ABA4FF78474248B51A2F0CB 85093~|~1~|~2~|~02/S<2~|~This split is for the portion of US224 and SR694 inside the Ottawa-Glandorf Urban Area, but outside the village of Ottawa. The point were US 224 enters the Ottawa-Glandorf Urban Area is the west corportation limits of the Village of Glandorf. All of SR 694 being resurfaced with this project is included in this split. All funds in this split are from the District Preservation Program Budget. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~9144883B8265050BC3100BE1808B50099AEF8F61 85093~|~1~|~3~|~03/NHS~|~This split is for the portion of US224 inside the Village of Ottawa that is classified as NHS. This section begins at the west corp limit (slm 19.25) and ends at the end terminus of the resurfacing of US224 (RR tracks - slm 21.40). All funds in this split are from the District Preservation Program budget. No local funds are included in this split.~|~05 - 4R Maintenance - Resurfacing~|~98CEF90CA66AD361FC9ADC6D757ECF4C7327DBD9 85093~|~1~|~1~|~01/STR~|~This split is for the portion of the project outside the Ottawa-Glandorf Urban Area. The point where US 224 enters the Ottawa-Glandorf Urban Area is the west corporation limits of the Village of Glandorf. No portion of SR 694 being resurfaced in this project is included in this split. All of SR 108 being resurfaced with this project is included in this split.~|~05 - 4R Maintenance - Resurfacing~|~A4587D080D76DC4AFF1C6C5484A70E99E9A1CF46 124587~|~1~|~1~|~01/NHS~|~Plan split for all work on SR-2~|~04 - Reconstruction - No Added Capacity~|~679537EC64CA796EDDA8EA2DB8639822C1630738 93593~|~1~|~1~|~01/SAF~|~realign intersection of SR129/SR177/Eaton Avenue to eilminate offset intersection. Construct new signal as part of work.~|~21 - Safety~|~A4A59F7AD9EEB811FFC0F05A1A800AE14866A25A 79514~|~1~|~1~|~01/ERD/Park~|~Construction of a 2,500 foot towpath trail parallel to State Route 21 in the City of Massillon, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~6638A07EFFF86335BCDB5795923FB9C755383634 115509~|~1~|~2~|~02/S5K/CONN~|~Decorative crosswalks.~|~04 - Reconstruction - No Added Capacity~|~5C5EDD85CDAF7E2D225A39E26F2F5B8A5683E7D6 115509~|~1~|~1~|~01/S5K/CONN~|~Pavement replacement that includes culvert and drainage work, and Alt Bid Items for decorative lighting and signal luminaires.~|~04 - Reconstruction - No Added Capacity~|~B385940554ADC327A74F74EFE56EC10DC6B32FEB 109082~|~1~|~1~|~01/SAE~|~100% Safety Guardrail plan split~|~21 - Safety~|~90E2B51C8BE1605E5E27A4DEDC2ADEF20CD94FB1 107733~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 7.45-7.50. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BAC5A054077F738EB223316994E74894D3434CA6 107733~|~1~|~2~|~02/STR~|~Special MOT operations for Stat Oil Co. with an oversized load. 100% State funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~71D56A230EC682DA4E2F0DB29AC0E6BEAB8D9DE4 117411~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~~|~BF2B12532061CC3CD5D52FD94FAF7E0EAB00C1D4 124548~|~1~|~1~|~01/NFA~|~Created For ODOT TID involvement. ~|~44 - Other~|~468A79120355C6A811E8EE713711A1C3ACF87722 112425~|~1~|~3~|~03/S5K/CAMB~|~Curb ramps on Gue-SR 209 in the City of Cambridge.~|~05 - 4R Maintenance - Resurfacing~|~7FFFDAA2A2E88CA4F8EC6834AADBDAAC346E5CA4 112425~|~1~|~1~|~01/S5K/CAMB~|~Resurfacing on Gue-SR 209 inside the City of Cambridge.~|~05 - 4R Maintenance - Resurfacing~|~C6980D4D68EEDDADC6553D8B91C68828D5C3B81D 112425~|~1~|~2~|~02/S5K~|~ Resurfacing on Gue-SR 209 outside the City of Cambridge.~|~05 - 4R Maintenance - Resurfacing~|~51888934EC9CE86364AC7E1551DCAA0AAF0A5D43 110112~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs using Indefinite Delivery Indefinite Quantity (IDIQ) construction project format.~|~47 - Bridge Preventive Maintenance~|~F7F096C4AB58C48B046820B2BBB0F55996443889 119879~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Scioto River ~|~28 - Facilities for Pedestrians & Bicycles~|~9685EC51E2D02E8A1D42B1F61FA99236DDBB7E67 111070~|~1~|~1~|~01/S<2~|~Project plan split: GSM funds then District Alloc.~|~44 - Other~|~626F0CD0180A87E8639657EE5A4F200F8823B15F 120440~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~F6176F6256ADA8B9B48487047499980467789E4C 92030~|~1~|~1~|~01/NFP~|~Split for CO~|~17 - Construction Engineering~|~A9409EF9023DFD9E2181E1C2208F21949B52E944 96798~|~1~|~1~|~01/IMS~|~90/10 Federal State IR Funds (non-BR): FRA-70-15.50 under Ohio Ave.; FRA-70-15.60 under Champion Ave.; FRA-70-15.83 under Linwood Ave.~|~13 - Bridge Rehabilitation~|~306617715E154B2D9CCE18F4F04F31C7C0961006 125994~|~1~|~1~|~01/NHS~|~Split~|~03 - Reconstruction - Added Capacity~|~A2F484171449D681F221EFA48BF0BBCD8ABF9C2F 115175~|~1~|~1~|~01/STR~|~Pavement resurfacing project with shoulder work and pavement markings funded at 80% using (4B77) CEAO CSTP.~|~05 - 4R Maintenance - Resurfacing~|~7027470029C38A7CD37451937E52176075921435 122962~|~1~|~1~|~01/NFA/PATA~|~Municipal Bridge Program for the Key Boulevard bridge rehabilitation project in the City of Pataskala (SFN 4564014)~|~13 - Bridge Rehabilitation~|~37139A82646B6FE4EDB961BF6EC98D747D65467B 126493~|~1~|~1~|~01/SAF~|~CEAO HSIP Safety project to install and upgrade guardrail on various county road. ~|~21 - Safety~|~5C256C5C3D1C9EBD073FC4717A0D1F11D095678D 96629~|~1~|~1~|~01/STR~|~Culvert replacement project. VIN 50 and Various. Funded 80 fereral/20 state.~|~04 - Reconstruction - No Added Capacity~|~4C4736F5A6A2398D63B9049F0A1D6A83405F1533 96629~|~1~|~2~|~02/NHS~|~Culvert replacement project. NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~410E4EE7E84142C3559A9BA4F84120C9D6F4717D 96629~|~1~|~3~|~03/NFA~|~Culvert replacement project. Not on any federal aid system funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~1CCB57BB2A9727FC1C0704E4624B45E746EBF173 124314~|~1~|~2~|~02/STR~|~All work along the STP Rural classified routes. (SR 65)~|~28 - Facilities for Pedestrians & Bicycles~|~216CB64FD1B93D49F9CCC11CD43BD9BE54A6437A 124314~|~1~|~1~|~01/NFA~|~All work off the federal aid system on the local routes inside the village.~|~28 - Facilities for Pedestrians & Bicycles~|~D936DC0ABB894DB2C0FB614BBDB867CF15236DDE 117601~|~1~|~1~|~01/NFA~|~delivery & installation of bridge beams/deck~|~47 - Bridge Preventive Maintenance~|~810890C075FD71D2F60D1B07889E95CA225113C9 125691~|~1~|~1~|~01/NFP~|~Plan split for electrical maintenance work~|~47 - Bridge Preventive Maintenance~|~520D471816782D4D3BD117112BFF9D9938C7C1CB 125388~|~1~|~1~|~01/S>2~|~Resurfacing with related work on SR 310.~|~05 - 4R Maintenance - Resurfacing~|~26C64ADD63033F72240506BF473A7B65E7571A19 125388~|~1~|~2~|~02/S>2/PATA~|~Resurfacing in the City of Pataskala.~|~05 - 4R Maintenance - Resurfacing~|~254426A238BD1FB53CFA73CD1EA83BF5B2015959 109140~|~1~|~1~|~01/NFA~|~Sidewalk replacement, curb ramp installation, crosswalk striping and signage upgrades around 5 elementary schools in the City of Youngstown.~|~21 - Safety~|~045F549CE10C595FD9D6B2E274EC42D16F263367 84296~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~8B8FAE6916938C6C9211869999BFEB729FD7296A 101159~|~1~|~1~|~01/STR~|~Various bridges.~|~13 - Bridge Rehabilitation~|~1716D3A8F528D0C7572F73BF8FF1D2563102D5B5 112925~|~1~|~1~|~01/NHS~|~UNI-33 from 24.56 to 25.11. FRA-33 from 0.00 to 0.98.~|~05 - 4R Maintenance - Resurfacing~|~31B71F5353099672B62AA68FCED9A97E1275BA8B 101357~|~1~|~1~|~01/NFP~|~Bridge cleaning.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2342D158D23F322A3DC7663815B9C3FC3CE1CE13 109712~|~1~|~1~|~01/IMS~|~Fine poly AC overlay on:MIA-75 SLM 12.75 to 14.15~|~05 - 4R Maintenance - Resurfacing~|~C7C97487A4217F17771B17F9A5E30E929D30A001 102860~|~1~|~1~|~01/NHS~|~Resurfacing NHS routes~|~05 - 4R Maintenance - Resurfacing~|~BBC85B08CBE42F9760757C983206A630E5F5F0D4 102860~|~1~|~2~|~02/STR~|~Resurfacing STP Rural routes with asphalt~|~05 - 4R Maintenance - Resurfacing~|~229101AD50B949E4DE80BB2E809DDD0FF8ED800D 93295~|~1~|~1~|~01/MPO~|~80% federal / 20% local funding split using MPO STP funds for the resurfacing of Hubbard Road.~|~05 - 4R Maintenance - Resurfacing~|~D67481A9B769A05AB2D679B6E1E4C1011761B15D 116663~|~1~|~1~|~01/IMS~|~plan split work for geotech work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B5ACAB191647A691A213540D9FBA98BA196CE4DD 124956~|~1~|~1~|~01/MPO~|~Repaving Deerfield Road on federal aid system~|~05 - 4R Maintenance - Resurfacing~|~9D0E97206CBA31B427D60DB61EBBAB32B6ECFC04 124956~|~2~|~2~|~02/NFA~|~Plan split for 100% locally funded, non federal aid system, items~|~05 - 4R Maintenance - Resurfacing~|~F6301423B9D06DB5EAE7D2B4700FCB83DEAC2583 94603~|~1~|~1~|~01/NFP~|~New Fulton County FSMF - 100% State Funds~|~01 - New Construction~|~6AF42915A8311B8471F0962475F4278FCF3A9B41 87058~|~1~|~1~|~01/NHS~|~priority system minor rehab. on TUS-250-21.32 to 21.86: concrete pavement repairs and pavement marking~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D09FEBDFD4DB0BC1811F8FBD944A63B9FB1F7313 117230~|~1~|~1~|~01/MPO/CIN~|~Demolition of the Chem Pack structure.~|~44 - Other~|~DCCBBB64D23D040FFA751AD4DDBE22098AD22617 105794~|~1~|~1~|~01/STR~|~Landslide repair using Rock removal treatment. MEG 124 32.23-32.33. STP rural Federal route using 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AF4A6AEF1A9936B62B4B9B0C9AAA0099A3FE6338 116352~|~1~|~1~|~01/STR~|~Resurfacing TUS-39 from SLM 0.71 to SLM 2.94 & SLM 7.35 to SLM 8.81~|~05 - 4R Maintenance - Resurfacing~|~B1C3108FCB0C60AA4994083DC626ACAB167E6639 116352~|~1~|~2~|~02/S<2~|~Resurfacing TUS-39 from SLM 8.81 to SLM 10.24 & TUS-211 from SLM 0.00 to SLM 0.05~|~05 - 4R Maintenance - Resurfacing~|~E57DECAC9C5A6167D3DE8A73B9B525A3C94198E0 124936~|~1~|~1~|~01/STR~|~Plan Split for resurfacing of Other Federal Aid Rural route~|~05 - 4R Maintenance - Resurfacing~|~ABD66A1DD63519E6173BF3C2073E186F4C7C1B42 97622~|~1~|~2~|~02/STR~|~Resurfacing SR 170 from SLM 2.56 to SR 154, including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~84A825DD161CF5B52A1D4F82B712EFB522F11544 97622~|~1~|~1~|~01/S<2~|~Resurfacing SR 170 from SLM 1.72 to SLM 2.56, including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~E52B70B37401F66EC12D982C410C96442DF53678 108155~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: DEL-37-8.27-8.36, 8.51-8.62 & 8.66-9.18 DEL-42-5.15-5.20 & 5.35-6.90~|~05 - 4R Maintenance - Resurfacing~|~299C18E2FF9ADF01AB2882E1C9C52ACCF2D24087 118976~|~1~|~1~|~01/STR~|~Plan Split for CSTP funding~|~05 - 4R Maintenance - Resurfacing~|~E06C193AA3791170F6CF62B72151442D899F99FC 76470~|~1~|~1~|~01/STR~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing on Gue-SR 800 from the 0.00 to the 2.48~|~05 - 4R Maintenance - Resurfacing~|~8BC65D08B565E69524D9E42152A7FF6BCE492FDD 76470~|~1~|~2~|~02/NHS~|~District Preservation Pavement Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing of Gue-US 22-15.16 to 31.04~|~05 - 4R Maintenance - Resurfacing~|~755EF3D994E38509D88BB78C41212CDCB6685675 81769~|~1~|~1~|~01/ERD~|~ Widen mainline US 27 from Oxford south corp to Chestnut Street to preferred design standards including increased shoulder width, horizontal and vertical curvature considerations, lane width deficiencies, and need for center turn lane provision at all major access points; upgrade signalized intersections to preferred design standards and determine the need for turn lanes on all approaches. City of Oxford~|~04 - Reconstruction - No Added Capacity~|~921F1C2A922700C3F20E9555B9782BAD346C340E 81769~|~1~|~2~|~02/ERD~|~Plan Split for total structure replacement over Collins Creek due to the mainline widening. Bridge BUT-27-1491, SFN: 0900788~|~10 - Bridge Replacement~|~DBBE6E263CD1789774645AC780A38C317ACA5E25 25619~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~13 - Bridge Rehabilitation~|~8F52D5C7B661461CECC67B69E4B2DC8E76AC7783 94316~|~1~|~1~|~01/S<2~|~From SLM 17.09 to SLM 20.19~|~05 - 4R Maintenance - Resurfacing~|~2027FB4E6A092278DBD043AB288377A158D8FBF7 94316~|~1~|~2~|~02/STR~|~HEN-65-18.28~|~13 - Bridge Rehabilitation~|~E896C041F6D29364BF77401C63B067A701BE7F94 91146~|~1~|~1~|~01/IMS~|~FRA-70 from SLM 0.00-3.41 pavement repairs~|~05 - 4R Maintenance - Resurfacing~|~EFF79A8BA1D7B879EFFC28E19C94AAECFF9684BF 91146~|~1~|~2~|~02/NHS~|~Spot pavement repairs on US 23~|~05 - 4R Maintenance - Resurfacing~|~368CCDAAB24CEE6412F2C172ACFCDFD255B2CFF6 117708~|~1~|~1~|~01/NFA~|~Pedestrian bridge repairs~|~28 - Facilities for Pedestrians & Bicycles~|~C1D704068C5EB2477A47F629042E44F62836995B 119065~|~1~|~1~|~01/MPO/LOVE~|~Installation of a traffic signal at the Little Miami Scenic Trail crossing of West Loveland Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~8C1A88A5E689AD0B1C8CE4C94A097BE22818E8A1 119065~|~1~|~2~|~02/SAE~|~Section 130 funding, railroad safety improvements, city of Loveland preemption interconnecting to ODOT pedestrian signal project.~|~21 - Safety~|~406AA8E912B21EA711323E0488C7DFFFA9CFFC7B 122202~|~1~|~1~|~01/SAF~|~Safe Routes to Schools funding~|~28 - Facilities for Pedestrians & Bicycles~|~FCE00765D7CB012941BAF9709F7EA0368E83B64A 105779~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid~|~13 - Bridge Rehabilitation~|~7B0FD6BDAAB24F8421618B5AAF29AE3077542987 104844~|~1~|~1~|~01/MPO~|~Construction of an on-ramp from southbound Mason-Montgomery Road to southbound IR-71.~|~01 - New Construction~|~8075EF68678D9AE3225E6C930CE4697CC457AF8A 104844~|~1~|~2~|~02/ENH~|~Plan split for construction of sidewalk along the west side of Mason-Montgomery Road from Escort Drive to the existing sidewalk constructed under PID 84731.~|~28 - Facilities for Pedestrians & Bicycles~|~3297FF53C8E1CB48414E7223B2E355BCF1E23694 104844~|~1~|~3~|~03/MPO~|~This plan split will include all work associated with constructing a new bridge for the proposed ramp.~|~01 - New Construction~|~72884666A5AAE3DF5AB3E5C2E7A51DF68C673559 104844~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~28 - Facilities for Pedestrians & Bicycles~|~81F000D5E76A6D77116AED36E6EE0E59E5E3861F 100343~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. 80% federal funds SAC 4PF7 and 20% state funds SAC 4PS7. No local funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~BAF86CCB1715EF961A6CF0F132B6730876DBB433 105599~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~D9D6ED9516C2A844FB940C79590626AE6E7C7A24 121371~|~1~|~1~|~01/NFP~|~FY28 Design Holder~|~44 - Other~|~0F147701195A58B917AAC2C76E068038D107A94F 98623~|~1~|~1~|~01/BRF~|~OBPP SFN 4734653 bridge replacement~|~10 - Bridge Replacement~|~0F69C1506AE607F11EBF7A9B067F2215200AF042 125791~|~1~|~1~|~01/BRO~|~Bridge replacement utilizing CEAO LBR (4B87) Federal Funds at 95% (including 15% CBP credit).~|~10 - Bridge Replacement~|~2C3374EB90DDDE40EC5C90395BD2ACFFD48A7CC9 123562~|~1~|~1~|~01/SAE~|~Plan Split for interstate locations. Routes TBD~|~21 - Safety~|~E5AC69FE19ADE3660678C912B3FE8435F0739381 122985~|~1~|~1~|~01/STR~|~bridge plan split.~|~10 - Bridge Replacement~|~C234170A8384E5DC920D89E39E15D293B8C0294B 117960~|~1~|~1~|~01/SAF~|~Plan split for guardrail maintenance~|~21 - Safety~|~3D3CD33CEDDD18363C889442248397B097AA444A 117960~|~1~|~2~|~02/BRO~|~Bridge hit~|~21 - Safety~|~F698F73872006BA9FB63350FB01CE775B93B0BE6 116694~|~1~|~1~|~01/STR~|~Rural sections of SR 235 and SR 309.~|~05 - 4R Maintenance - Resurfacing~|~78EEB8897577301742C010CD995A81A6B0A1A7BF 116694~|~1~|~2~|~02/S5K~|~Microsurfacing work on SR 309 within the Kenton Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~ADF9B9AD75A19276E553657870024F680534C8FD 122367~|~1~|~1~|~01/NHS~|~Bridge Maintenance, Major Bridge~|~47 - Bridge Preventive Maintenance~|~B3E812029B56ABE74ED66F157CE02EB607713ED0 122367~|~1~|~2~|~02/NFP~|~Part code for Alt items - fence.~|~~|~2B2833EE4263E2E03D97E3D76A57C7CB1EE536ED 86589~|~1~|~1~|~01/NFA~|~TAP Funding--All aggregate paths from site entrance to south end, all concrete sidewalks from site entrance to roundhouse area, (2) boardwalks and (1)overlook over bioswale with railing, boardwalk at launch drop off area and aggregate trail down to launch area.~|~44 - Other~|~52DE10F6A4D9702711E5DA5AECA5D210DFA066AC 86589~|~1~|~2~|~02/NFA~|~Gas Tax--All asphalt paving with concrete curbs, cobble special paving, storm sewer drainage system~|~44 - Other~|~BD276ADA6427ACA379D44CA5D8070D8E664E0429 117831~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~E13A414DD6068CE801659B9633C133265ED83C43 119857~|~1~|~1~|~01/IMS~|~Geotech Project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B4FEC2D0E15B074A7814A998D99225E99DBA345 119790~|~1~|~1~|~01/S>2~|~added plan split.~|~44 - Other~|~D8267BBB1A0C61A9A14833DFC7BEA0474391E137 91909~|~1~|~1~|~01/NFP~|~100% state ODNR funding for resurfacing at headquarters01/NFP/PV/~|~05 - 4R Maintenance - Resurfacing~|~6FEE4D4421DEB290A9ADE4E802DA1B1B818B525B 84743~|~1~|~2~|~02/S<2~|~Microsurfacing / CRA-019-04.20 - 04.82 Galion urbanized area and CRA-019-12.05 - 12.26 Bucyrus urbanized area~|~05 - 4R Maintenance - Resurfacing~|~9946486DB045940A2DAB1A6C849735B269ADF06D 84743~|~1~|~1~|~01/STR~|~Microsurfacing / Rural Segment 04.82 -12.05~|~47 - Bridge Preventive Maintenance~|~F2756DFD0962FFCC9E53B6C01C1423B0936357E8 110660~|~1~|~1~|~01/NHS~|~All the work to resurface the road is in this plan split. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~6680FFB7E2933239B5F7F5AC017998ADFF31D032 121170~|~1~|~1~|~01/NFP~|~Crack Seal plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7E6411E3DA4BE78152A3B532AECBFFAA7EECA518 106031~|~1~|~1~|~01/NFP~|~Split for work on the Type A Emergency~|~44 - Other~|~8A850E03E6C7A7B796B0F0F479A199A03AA9FA53 121414~|~1~|~1~|~01/MPO~|~Federal items.~|~05 - 4R Maintenance - Resurfacing~|~250ABBEBCE18BF3F4D4CABCC21B94C8F7712B6D7 105151~|~1~|~1~|~01/BRO~|~All work in the project. All funds from the District Preservation Program budget. No local funds.~|~10 - Bridge Replacement~|~456A0AF4F8505B48C1FCA85B32BAF56D26295DAC 116285~|~1~|~1~|~01/NFP~|~Fence maintenance/repair.~|~21 - Safety~|~A7AE24ECEC2739F1226A72D1C7F585B55615A846 123944~|~1~|~1~|~01/STR~|~emergency slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C17727E06E63FAE67539D1B426CDFDA77B26E6C4 112838~|~1~|~1~|~01/STR~|~Crack sealing various routes in District 11.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A015D379BBA47B5130F31E0E9D9E1DD21B601565 92472~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~32EBA5D476268BC54AA2E210D43B8322FA21DA38 81249~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehab backwalls and other repairs on 1) 6001955 MUS IR70 11.43 Intersect: Ramp A Over Ramp H; BR Eligible for Rehabilitation: Length=99 SD/FO(1) SR=44.8 DSR=5; 2) 6003036 MUS IR70 13.06 Intersect: I-70 Over Abandoned Rr; BR Eligible for Rehabilitation: Length=119 SD/FO(1) SR=59 DSR=6;~|~13 - Bridge Rehabilitation~|~DEDCFC5DC79F54D375768CF9F780FA3C49C30976 117129~|~1~|~1~|~01/MPO/BTWP~|~Resurfacing of Orchard Road, Yellowbrick Road, and Factory Road.~|~04 - Reconstruction - No Added Capacity~|~85D4B7BE3C4FD7D6D586D0DF02699FF0A7C40586 117129~|~1~|~2~|~02/NFA/GCEO~|~Split for reconstruction work on the portion of TR 1217 that is not on the federal-aid system.~|~04 - Reconstruction - No Added Capacity~|~C61A3CA1DCF76FFFC72E8B1E102AA8EDDCD08FC2 114530~|~1~|~1~|~01/SAE~|~Construct new mast arm signal with back plates, supplemental signal heads and lighting.~|~21 - Safety~|~F871669A986E3B394611EA31C0C248A3A7AF0619 126068~|~1~|~1~|~01/S>2~|~Plan split for resurfacing SR-199~|~05 - 4R Maintenance - Resurfacing~|~0EF19FD32A0EE4E88E1769F60569B2FBB034DE43 81314~|~1~|~2~|~02/SAF~|~The funding event CO CO Contr 07 (using ARC funds (SAC 4D37)) and funding event CO CO Contr 08 (using district preservation funds) are to be used to fund the traffic signal items~|~21 - Safety~|~1F4DB9C400B3B10CE0DDD17898E5B34ACD5CCF85 81314~|~1~|~1~|~01/NHS~|~This plan split is for all pay items except for the traffic signal pay items (see plan split #2) to improve the flow of traffic from SR 7 & University Blvd intersection to US 22 in the city of Steubenville.~|~21 - Safety~|~CBCE9AD6B1AA6FA5C64790945AAC6E77A83D163F 81314~|~1~|~3~|~03/S<2~|~Purchase of 24" Steel Casing Pipe as a change order~|~44 - Other~|~B94725458DAC0B7C37E84A7A00E91A981B0A150D 81314~|~1~|~4~|~04/S<2~|~Change order funds for the marina bike path upgrade.~|~44 - Other~|~C0231BBF67F0F2400D9B00E23C89DC028DA93B50 98228~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (90% Federal)/4PS7 (20% State) - NO CAP - Annual Contract for Fast Dry Pavement Markings including Auxiliary markings on specified Interstate Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~13091634FBD7F61F0E4CEBA959293482559892F3 98228~|~1~|~4~|~04/STR~|~District Preservation - 4PF7 (80%)/4PS7 (20%) - NO CAP - Annual Contract for application of Fast Dry Pavement Makings and auxiliary markings on specified OFAH-Rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE699430F0269D98D7BF29EBFC5285F90E8E1E92 98228~|~1~|~5~|~05/NFA~|~District Preservation - 4PS7 (100% State) - No CAP - Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified NOFAS-Rural routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2FDB5D8C8A18641F4D4119C2A508A07A6B4CE74B 98228~|~1~|~6~|~06/S>2~|~District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - NO CAP - Annual Contract for Fast Dry Pavement Markings including Auxiliary markings on selected OFAH-Columbus routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F80E418671F9FD6F81F6B285E18BD0B575EAF91E 98228~|~1~|~2~|~02/NHS~|~District Preservation - 4PF7 (80% Federal)/4PS7 (20% State) - NO CAP - Annual project for replacement of Fast Dry Pavement Markings including Auxiliary Markings on specified D-05 NHS Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5A1BFC4AF51C7EB7AB4022CE960DA86167CD5FEC 98228~|~1~|~3~|~03/S<2~|~District Preservation - 4PF7 (80% Federal)/4PS7 (20% State) - NO CAP - Annual project for replacing Fast Dry Pavement Markings including Auxiliary markings on selected D-05 OFAH-Urban routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD2FCBB91613913B8C92E9FFD59A5667ECD75D45 97379~|~1~|~1~|~01/ENH~|~Install decorative LEP lighting on Monument Avenue Bridge (SFN 5760631) over the Great Miami River~|~31 - Landscaping & Other Scenic Beautification~|~8CC69C286C0F2C28CD20D932F6679803970E29DF 104637~|~1~|~1~|~01/IMS~|~Rehabilitation of three structures (LIC-70-10.77, LIC-70-20.99, and LIC-70-23.20) along IR 70 in Licking County.~|~13 - Bridge Rehabilitation~|~21E9309218FF1037365FAB553071BE6919E31EDA 17585~|~2~|~2~|~02/NFP~|~City of Dublin 100% local funding to improve intersection of Sawmill/Hard Roads. Local Sponsor - Part 2 - City of Dublin~|~03 - Reconstruction - Added Capacity~|~BEFC37499E5B6B748B29602C7603DE3C65A4A49C 17585~|~1~|~1~|~01/MPO~|~MORPC STP funding to widen CR61/Hard Rd from Sawmill Rd to Smoky Row RdLocal Sponsor - Columbus~|~03 - Reconstruction - Added Capacity~|~FD99594E5FDEEFD4644C7EE6DE171D0A777A091B 108829~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~6B0F7A64C93193EB623C7BA21F5E4A765941FA7F 108829~|~1~|~3~|~03/STR~|~Replacing culverts.~|~04 - Reconstruction - No Added Capacity~|~64CAAD5467604B83CFB6BD27E1C4316319A533D0 108829~|~1~|~1~|~01/NHS~|~Replacing culverts.~|~04 - Reconstruction - No Added Capacity~|~0C58B975B0A5CA3F64D4B85ACD81C501DF21EB36 116701~|~1~|~2~|~02/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~C821CBEEB8599FF7DCAF45957D993A9C042D329F 116701~|~1~|~1~|~01/S5K~|~Marion Urban Area and Ashville-S Bloomfield Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~354AF41E14E61E3121D9B78D418F1A582FF0D02A 116701~|~1~|~3~|~03/IMS~|~Interstate plan split.~|~05 - 4R Maintenance - Resurfacing~|~AF874B5DB4811302FF14DA249BC9E1ACEED60CEE 116701~|~1~|~4~|~04/NHS~|~NHS plan split~|~05 - 4R Maintenance - Resurfacing~|~B757FD2D9DB99DB187E2E54DBD7B8A9405997297 116701~|~1~|~5~|~05/S>2~|~STP > 200,000 plan split~|~05 - 4R Maintenance - Resurfacing~|~BF938E4166A8C0346EE2B5502C028732E7E3031B 107454~|~1~|~1~|~01/NHS~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~92D2BFBD5CF6355884E45C24E062F2258889B3B0 107454~|~1~|~2~|~02/NFA~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~33E0471544856520ABEB73BE3FCE1A0D08F6C073 125291~|~1~|~1~|~01/STR~|~Culvert Replacement Project WAS 26 5.56 (CFN 1885025), WAS 26 11.71 (CFN 1880730), and WAS 26 13.97 (CFN 1880748).~|~04 - Reconstruction - No Added Capacity~|~1718257B7F88B1D37B4E77837B78139B44764852 112584~|~1~|~1~|~01/NHS~|~FRA-33 from 21.91 to 24.27~|~05 - 4R Maintenance - Resurfacing~|~794F268729F283E101A897ECBA2EDACDEF1E9BE6 110216~|~1~|~1~|~01/MPO~|~All the work in this projects. Pedestrian facilities. Part of ADA plan. 100% federal funds using MPO-STP funds and Toll Revenue Credt until the cap is reached. Any funds needed over the cap are the responsibility of the Village of Lafayette.~|~~|~C9A67EE88AA8C1AEE5D964DCF28E162106EE29FF 110084~|~1~|~1~|~01/SAF~|~Raised pavement marker project throughout the District~|~21 - Safety~|~CA023C1F88553A636A8B4DB7FB63C32E6B4B0611 96135~|~1~|~1~|~01/NFP~|~Pole Building at the Lawrence County ODOT Garage~|~44 - Other~|~8AA6611B03779878BEB9851C3A3E950F791855A0 107572~|~1~|~1~|~01/SAF~|~Raised Pavement Marker project for FY2024. 100% State funded.~|~21 - Safety~|~2E98A2E0BA03946D3AB01BDD0664994E6DDB2E27 116682~|~1~|~1~|~01/STR~|~This split is for the portion of SR694 that is outside the Ottawa-Glandorf urbanized area.~|~05 - 4R Maintenance - Resurfacing~|~F903AA9AE313E59A5FDC62675E78AEE83E7DC79E 116682~|~1~|~2~|~02/S5K~|~Resurfacing inside of the Ottawa-Glandorf Urban Area. Although the work is inside of Glandorf, as Glandorf is a village they will not be providing funds. All funds will be from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~B1AAC3CA413D9A51C98CF486C5B6E7F9E257D683 116682~|~2~|~3~|~03/STR~|~All resurfacing work on US 224 within the "Rural" classification area. SLM 12.130 to 18.335.~|~05 - 4R Maintenance - Resurfacing~|~6F28AFAE095ABAB0A9B35165ABE43E45113B00D5 116682~|~2~|~4~|~04/S5K~|~All resurfacing work on US 224 within the Ottawa Glandorf urbanized area. SLM 18.335 to 19.890.~|~05 - 4R Maintenance - Resurfacing~|~FED89105BA34A5875DB2E5FE2EF8A14F8622873A 13484~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split using federal funds for bridge work~|~13 - Bridge Rehabilitation~|~4C0D0E3630B3D5560DED7F6FB0BFFFCE5151DA38 13484~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~B4EF19E857667E42AB7CEC8BC6036C7D1AC4B343 122047~|~1~|~1~|~01/STR~|~Construct roundabout at the intersection of PIC-752 and PIC CR 7 (Walnut Creek Pike)~|~21 - Safety~|~2913D6C062FA105D70E1A48A3C1C6EEB187EDF00 107587~|~1~|~1~|~01/S<2~|~JAC 124 17.55-17.76~|~05 - 4R Maintenance - Resurfacing~|~F7547D591F63E2C69CF9005B6E3449257FEDB889 107587~|~1~|~2~|~02/STR~|~JAC 124 17.76-23.97~|~05 - 4R Maintenance - Resurfacing~|~2C444A4E758A50F6496F5A8BD468A654688AAC78 107587~|~1~|~3~|~03/STR~|~Bridge pm~|~47 - Bridge Preventive Maintenance~|~6FF49DAE3D140B8249C4E85555AEA7D0B2EE3C7E 124505~|~1~|~1~|~01/STR~|~Various improvements on SR 61~|~21 - Safety~|~FD4F6E925E538627D95C2FE6A3D6D4DB3AF75B80 97094~|~1~|~1~|~01/NFP~|~Signals maint project~|~21 - Safety~|~8651D2376288F462F76B9DC98B73F27FF1FBF460 116927~|~1~|~1~|~01/NHS~|~Replace lifting cables on high mast lighting. ~|~17 - Construction Engineering~|~C4DA15B517866A6AF6F4C3E3DC8327A5DF9E33C7 105356~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~98A7B382A348E106178E2C225448DE5289955D50 101939~|~1~|~2~|~02/IMS~|~This funding event is for all work relative to the HAM-71-0154E bridge which is the entrance ramp from 5th street to northbound I-71 that begins at the rear abutment and ends at the first immediate expansion joint.~|~13 - Bridge Rehabilitation~|~7DF2A096018EDFE6AC295595FECE1A76E485D18E 101939~|~1~|~1~|~01/IMS~|~This plan split is for the rehabilitation of the Major Bridge HAM-71-0159 includes all bridge work, MOT and approach work (surface course, necessary for the bridge rehabilitation work). All roadway upgrade work not necessary for the bridge rehab and work on the HAM-71-0154E bridge shall be included in separate plan splits.~|~13 - Bridge Rehabilitation~|~A7EC29432F68BB6F6C90A1B9EFFB3A75EAFB72B4 101939~|~1~|~3~|~03/IMS~|~This plan split is for roadway costs that are the District's responsibilities that are not associated to the bridge work. This includes the intermediate course replacement, sign upgrades, ets.~|~05 - 4R Maintenance - Resurfacing~|~AF9638E5E512F316F033C6EFA68C348A77A7B4BE 88916~|~1~|~1~|~01/S>2~|~Resurfacing TRU SR 193 0.00 to 5.37.~|~05 - 4R Maintenance - Resurfacing~|~79AF49F45CB904E6ABE560A01EC113710C8217F4 88916~|~1~|~2~|~02/STR~|~Resurfacing TRU SR 193 5.37 to 6.78~|~05 - 4R Maintenance - Resurfacing~|~D74DE4CC78BA607890DE02F9201E811B7F078A7C 88916~|~1~|~4~|~04/STR~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~7A50D8BA5647691766D50EFFC4241F16E529A22B 88916~|~1~|~3~|~03/S>2~|~See linked structure 10' to 20' span.~|~13 - Bridge Rehabilitation~|~751243545EB2A3ADD6055012A3670DB4D83DFB6F 98227~|~1~|~3~|~03/S<2~|~District Preservation - 4PF7 (80% Federal)/ 4PS7 (20% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on pavements OFAH-Urban~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B9AE1619020BF5BACEA66FE31842E7B6948CAE81 98227~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (90% Federal)/ 4PS7 (10% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on Interstate Routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6175E56FF48E50791C4EA6D82CB1C6216135050 98227~|~1~|~2~|~02/NHS~|~District Preservation - 4PF7 (80% Federal)/ 4PS7 (20% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified NHS routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~97167C6B1B0AACE06A6550D38BE2AD756EE121C4 98227~|~1~|~4~|~04/STR~|~District Preservation - 4PF7 (80% Federal)/ 4PS7 (20% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified OFAH-Rural routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C0D5EC86F6DB8AB6935A4526CD5DFFB5EFDCB0A 98227~|~1~|~5~|~05/NFA~|~District Preservation - 4PS7 (100% State) - No CAP -Annual contract for placement of Fast Dry Pavement Markings within District 5 on specified NOFAS-Rural routes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A17C4EFE394AE1632FF29B9256ACAD0FD2650D0 102483~|~1~|~1~|~01/STR~|~Microsurfacing of HOL-83~|~05 - 4R Maintenance - Resurfacing~|~11C757D8533E205F714DD3800B88B7F21CD3AAF3 119422~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~231AE13A14E186868BFFB3A2FB06FE012FAC6A43 115995~|~1~|~1~|~01/NFA~|~Bridge replacement~|~10 - Bridge Replacement~|~18BECD45C015507A32A07252D32C4356B1C34342 81712~|~1~|~1~|~01/BRF~|~Replace existing bridge (HOL-520-0644, SFN 3802701) with a new multi-span steel beam bridge.~|~10 - Bridge Replacement~|~2C06547DE23D8EE3B41AFCED8671C094DEBD46BD 120081~|~1~|~1~|~01/NFA~|~ODNR Resurfacing of Pickerel Creek Wildlife Area~|~05 - 4R Maintenance - Resurfacing~|~1077C513ED5132BBB3F681C7299DFDC6DE9766C9 106509~|~1~|~1~|~01/S<2~|~Marietta City Schools improvement project using SRTS funding. Work includes the reconstruction of a traffic signal, sidewalk widening, new crosswalk markings, ADA compliant curb ramp replacement, and new bike racks. Funded 80%/20% Local (using TRC).~|~21 - Safety~|~5ECA668C5257BB8C61C1E5A58F2754DC6544C074 94405~|~1~|~1~|~01/S<2~|~Resurfacing RIC-42-3.48 to 7.22.~|~05 - 4R Maintenance - Resurfacing~|~833F47F1132195918E4544D540E7757A507AFD12 94405~|~1~|~2~|~02/S<2~|~Bridge Work on Structure RIC-42-0431~|~13 - Bridge Rehabilitation~|~85F9B56CE1ECD44A7960493799D8878169CCDFCC 112394~|~1~|~1~|~01/STR~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~695847AABE9AD0C32A8C8ED4CEA423C705A22C0C 102475~|~1~|~1~|~01/STR~|~Minor Rehab of pavement on BEL-331 & HAS-331~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2095EDBA106B0E8DA653559A22A17F7873B4ECFB 105860~|~1~|~3~|~03/NHS~|~Dominion East Ohio gas line work.~|~43 - Utilities~|~B1531951BB42976FB0850EAD91251519F15BB76C 105860~|~1~|~1~|~01/NHS~|~Deck replacement >20' span.~|~13 - Bridge Rehabilitation~|~CE5C3062379E1FC998FF572107EA361E36B2E3B1 105860~|~1~|~2~|~02/NHS~|~Installation of partial interchange lighting at the State Route 5/14/44 interchange in Portage County.~|~21 - Safety~|~29FB6CC2637E0F3A4C876F093E62AE3AFB5DC6EE 105860~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~~|~90FD45488405D6D747298002F9FA9EE34A7D4A03 100426~|~1~|~1~|~01/NFA~|~HIG 321 0.00-5.74~|~05 - 4R Maintenance - Resurfacing~|~F1E9A7971D581FA8567708C9DA8710BE3ADEC9AF 100426~|~1~|~2~|~02/STR~|~HIG 321 5.74-9.07~|~05 - 4R Maintenance - Resurfacing~|~6B0414B23E1E8B991D5E8C50F5648349254C5E79 100426~|~1~|~3~|~03/STR~|~Bridge pm.~|~47 - Bridge Preventive Maintenance~|~DAF043F483074DAF4CB3F79FFF718B3728BE3074 112992~|~1~|~1~|~01/STR~|~Culvert rehab~|~04 - Reconstruction - No Added Capacity~|~20ECD41D2B68521B0BAFC8DAD5D3B582F21B068D 95074~|~1~|~1~|~01/S<2~|~District 5 Geological Site Management Program Funding - 4SF7 (80% Federal) / 4SS7 (20% State) - See CAP Comments - Rock Scaling on LIC-SR 13-07.82 to 07.92~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~523712F51495CA386D994867D32B815EF3104CEC 115866~|~1~|~1~|~01/SAE~|~Pavement marking project on various County routes~|~21 - Safety~|~C49A892A1CCDC539B355914E627CE79E15908437 109972~|~1~|~2~|~02/SAE~|~Install Amish buggy signs and detection system on SR-320 in Preble County~|~21 - Safety~|~CD803EC180B5E30AF4F402A651A01C2CE45BEEC8 109972~|~1~|~1~|~01/SAF~|~District wide signal contract.~|~21 - Safety~|~2F8FA6D9460CAFAF70F1DABEE93B33EADE0DFE6F 114856~|~1~|~1~|~01/IMS~|~Repair transverse joints prior to PID 88679 in 2024~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB9AB1BE22C67716AF3EB6F713607AFEAB8FD5ED 112612~|~1~|~1~|~01/ENH~|~Installing sidewalks on High St NE and Willow Dr NE in Howland Township.~|~28 - Facilities for Pedestrians & Bicycles~|~BA52BCD628FEA82B47D512B25C351482E7AB20EE 114409~|~1~|~1~|~01/SAF~|~Split for project eligible work.~|~21 - Safety~|~E2642416941F3B75604E1D28AABB2C7DF02D02FC 114409~|~1~|~3~|~03/NFP~|~Split for project non-eligible work.~|~17 - Construction Engineering~|~6B4BD339C3A4B9E1E2F7A04EDF60AE5DB5A32DF3 114409~|~1~|~2~|~02/MPO~|~Split for MPO eligible work for resurfacing SR 87 from IR-271 ramps to Orange Place.~|~05 - 4R Maintenance - Resurfacing~|~6FBDF402AB9E8A2A609BB9EF641CFB7752719B2B 101217~|~1~|~1~|~01/NHS~|~NHS Eligible portion (US 224).~|~05 - 4R Maintenance - Resurfacing~|~4B98590B505A0246E278C3701B74213566C232DB 124938~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing Other Federal Ais Urban roadway with District preservation.~|~05 - 4R Maintenance - Resurfacing~|~B59EAA6F956BD369DF569267523BDAFED158C88C 96923~|~1~|~1~|~01/S>2~|~New signal at IR-680 @ SR-164 Northbound ramp. Revise striping, guardrail, and overhead signs. Beaver Township, Mahoning County, Ohio.~|~~|~272A1663CC72FFF014CF8F8F32C01FF6251A4D77 82421~|~1~|~1~|~01/IMS~|~Overlay on Interstate routes: MOT IR 75 SLM 18.24 to 19.89MOT IR 75 SLM 19.89 to 20.79MOT IR 75 SLM 20.79 to 21.42MOT IR 70 SLM 15.53 to 17.34Repairs and resurfacing of Airport Access Road.MOT IR 70 SLM 14.00 to 15.00~|~05 - 4R Maintenance - Resurfacing~|~67B75EED8B25EDFB5CE71947F35312C409EB85AA 118782~|~1~|~1~|~01/NFP~|~Asphalt Concrete Overlay~|~05 - 4R Maintenance - Resurfacing~|~0390EE76A11128749C119371FA3D6BC7B2C0954F 118782~|~1~|~2~|~02/BRO~|~Bridge Work FY 2029 in General System as a Block Out.~|~13 - Bridge Rehabilitation~|~6997B7383ACCB6E0871AE8574A380065EBD9C285 99546~|~1~|~2~|~02/S<2~|~STP < 200000 Culvert: ASD-511-16.89~|~04 - Reconstruction - No Added Capacity~|~61AB3CFC7513DA9C2D3DE0FEEC3BB5B965D90B4B 99546~|~1~|~1~|~01/NHS~|~NHS Culvert: ASD-42-6.11~|~04 - Reconstruction - No Added Capacity~|~683E729049D89285AF510C876F53308A7DF3F464 110650~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~6D558974056FA564FBE5AC306F6A611AF250C206 110650~|~1~|~2~|~02/S5K~|~Minor bridge rehab > 20' span.~|~~|~6049FB114BBBCF7AE753079957E3D51DCE5F2906 111388~|~1~|~1~|~01/SAF~|~Project to connect existing bike-way in Vandalia.~|~28 - Facilities for Pedestrians & Bicycles~|~775E977274E99554C268A6C478EEED3E1A36845F 105364~|~1~|~1~|~01/NHS~|~AC overlay without repairs on:MER US 33 SLM 16.02 to 18.57~|~05 - 4R Maintenance - Resurfacing~|~221B656F80F7F8BDE6053806FA2286FB8D4623B6 109927~|~1~|~1~|~01/SAF~|~Federally eligible~|~21 - Safety~|~9461A0BEBB83283C1519C2DFDDE4FD6D101C32E6 123620~|~1~|~1~|~01/IMS~|~Plan split for Interstate~|~05 - 4R Maintenance - Resurfacing~|~1692F330F06C04F1B83576963CC060F4A62A7C45 98063~|~1~|~1~|~01/IMS~|~Split for work on this project~|~03 - Reconstruction - Added Capacity~|~EE01AB98A537A47A7B190A72E455F040EDF29091 84585~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 145 8.94-12.39. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~858FDE8B2EA3087B1EF3CE52C33BB2CC90DABC10 92263~|~1~|~1~|~01/STR~|~Culvert Construction/Repair~|~44 - Other~|~205F7CF81758894E9530E3BD267F8D233B1BB71C 22213~|~1~|~1~|~01/BRO~|~Plan split for federal eligible work to replace the Harvard Rd bridge: 1806459; CUY-077-12.12~|~10 - Bridge Replacement~|~2CA6E8BC46CC9DAC8EF0CCE74922A538F116F840 22213~|~1~|~2~|~02/NFP~|~Split for work at 100% local cost.~|~10 - Bridge Replacement~|~CA14C9454DDD3CD3CD9B6BD4D12AC12938DB0A45 22213~|~1~|~3~|~03/BRO~|~Split for work to relocate CEI power lines~|~10 - Bridge Replacement~|~00DED71708A95D9559F75E2DCFF269236456C439 22213~|~1~|~4~|~04/BRO~|~Split for work to relocate Charter Communications~|~10 - Bridge Replacement~|~F034F3C11BDFC3C64E79472C86895A09DC747C19 103541~|~1~|~1~|~01/NFA~|~The county is improving and widening nearly one mile of CR34 form CR15 to Twp. Rd. 75 near Old Fort to support the growth at the Church & Dwight Facility.~|~01 - New Construction~|~8551C2A9F27AFA25B60FE960262265F10199FAA7 87116~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. NOB 340 7.01-7.08. Urban funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~0F8E5BCA019EFFD3DCDC68169C61A9AA764352F7 87116~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GUE 340 1.59-2.45 and NOB 340 0.71-7.01. Rural other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~3D41C94B800B3003BFE017C6842EC892CB060D6D 87116~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. MRG 555 15.33-22.94 and PER SR 555 0.00-0.33. Not on federal aid system. 100% State funded.~|~05 - 4R Maintenance - Resurfacing~|~BCB419E2855BC60D52757D05FADFD06E1B3BF4A0 87116~|~1~|~4~|~04/SAF~|~Installation of transverse rumble stripes on NOB 340 6.85-7.07. Funded 90% Federal/10% State. ~|~21 - Safety~|~E197DBEC1DE05ECE2982F1354F5A6D73F68FF6CB 93924~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2016. Various routes and sections in D10. Funded 100% state.~|~21 - Safety~|~BC32453F3F199A7CC294382E3701825E1E3D7318 127127~|~1~|~1~|~01/MPO~|~Primary split for MPO CRP and TA funding~|~28 - Facilities for Pedestrians & Bicycles~|~8F9E2073E967DD396D1ACC75A31AD72EE552B371 117496~|~1~|~1~|~01/BRF/BCEO~|~Replacement of the existing bridge superstructure, repaving approach pavement, upgrade to existing guardrail.~|~13 - Bridge Rehabilitation~|~771FD41F7AF61068FD0DFE8EF98A6CE2CFE04893 95630~|~1~|~1~|~01/IMS~|~Emergency project to remove a damaged pedestrian bridge using 100% State funds.~|~13 - Bridge Rehabilitation~|~9670F1080E1513317F910904305BEA063BF57484 112491~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~015A10311E1BDABF0F4DEB64D1DFE3994FE35289 94576~|~1~|~1~|~01/NFP~|~Pavement markings via work order throughout six District 4 counties.~|~21 - Safety~|~7388B437DCCF5A7F1E95D3280775CA76E23147E0 123777~|~1~|~1~|~01/STR~|~STP ~|~05 - 4R Maintenance - Resurfacing~|~3074B8156726FF193F33DBE495E449B3F85F21F9 89159~|~1~|~1~|~01/BRO/MCEO~|~CEAO Bridge Funding - 4B87 (80% Federal) / LNTP Bridge Credit (15% Local) plus LNTP (5% Local) - Replacement of SFN 6035256 MUS CR 7 05.18 Intersect: Brush Creek; BR Eligible for Replacement: Length=57 SD/FO(1) SR=30.0 DSR=4~|~10 - Bridge Replacement~|~911AF544942FCB9BD8AE2A64903DE32590C228DB 115930~|~1~|~1~|~01/NHS~|~Replace deficient storm sewer segment along US 224~|~43 - Utilities~|~A46441766C849AD3637052DB7647ABF38F665BB3 80674~|~1~|~1~|~01/ERD/MCE~|~Widen Western Reserve Road (CR-32) including TWLTL from Hitchcock Road to State Route 7 in Mahoning County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~9A2D1C504E08FA004C192C53A13A2F008ADADB06 80674~|~1~|~2~|~02/S>2~|~Sanitary/sewer/drainage work along State Route 7.~|~44 - Other~|~D9FB769C99EDB29F44C8EC6064E00AAA846E25EA 80674~|~2~|~3~|~03/MPO/MCE~|~Widening of Western Reserve Rd between SR 7 and South Ave by adding TWLTL and right turn lanes at three locations.~|~04 - Reconstruction - No Added Capacity~|~558F15F3575789A97564C7DADACFDB6831623661 114987~|~1~|~1~|~01/STR~|~Pruning Contract.~|~17 - Construction Engineering~|~DDDB32E8E1DB252F454AB83E27C2AB9F6E37A8C0 109992~|~1~|~1~|~01/S>2~|~Culvert replace or rehab~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D482E58CC62CF47497DC1479F4B47A023EFEBEE9 111405~|~1~|~4~|~04/IMS~|~Widening for new lane.~|~13 - Bridge Rehabilitation~|~99B303E8DF0066316987DB65722ACA447F6C9036 111405~|~1~|~3~|~03/IMS~|~Bridge reconstruction of approach slabs for existing lanes and minor bridge work.~|~13 - Bridge Rehabilitation~|~43DF70109A6DB7BF449A71D9D84AAD1F4C619199 111405~|~1~|~2~|~02/IMS~|~Widening for new 3rd lane of IR-77 from Everett Road to SR 21 in Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~C9E6AF8B7CF4A9B8FB894223E8EEB2F237BD7C6C 111405~|~1~|~5~|~05/S>2~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~5C986B1063AC2CB5E2A4074AAFC6EAF3CAB55478 111405~|~1~|~1~|~01/IMS~|~Reconstruction of existing lanes, includes culverts.~|~04 - Reconstruction - No Added Capacity~|~4A6C6A2C903FF83A880B1A2E097B39D27F5B516B 109670~|~1~|~1~|~01/IMS~|~Slide repairs along I-76 from 20.05 to 20.25.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0B439923B069C740804835F927777AC68A2A7583 109670~|~1~|~2~|~02/IMS~|~Minor culvert work.~|~04 - Reconstruction - No Added Capacity~|~8C24CE3497E2163CB7524511C7E29C025853E91A 93916~|~1~|~2~|~02/NFP~|~SR-65 work outside pavement and deeper than 3.5" (full depth pavement repairs, curb, curb ramps, sidewalks,...) from SLM 1.79 to SLM 2.37.~|~05 - 4R Maintenance - Resurfacing~|~030420A8C67A892BD97E3F59DAD733CFB20CADD6 93916~|~1~|~1~|~01/S>2~|~SR-65 from Earl (SLM 1.79) to Woodville Rd (SLM 2.37) work between curbs to a depth of 3.5".~|~05 - 4R Maintenance - Resurfacing~|~2AD5B48150F6625175BF3A8A73CEEA0DE6433701 102809~|~1~|~1~|~01/SAF~|~Upgrade the existing traffic signal hardware at the intersection of US 30 and SR 9/CR 406 in the Village of Hanoverton.~|~21 - Safety~|~D90090548ED2D1F224B4116A42D5192BE8E3F662 94446~|~1~|~1~|~01/BRO~|~All bridge work eligible for federal BR funds at 80/20 fed/state split~|~13 - Bridge Rehabilitation~|~FF3394E59731A46B1CD7B95B819253212329B019 93042~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on 1) Cos-SR 60-00.00 to 14.61; 2) Mus-SR 60-34.76 to 35.51;~|~05 - 4R Maintenance - Resurfacing~|~96DB28B12F6A76BB2DAB791D61B6810ED95D769A 109775~|~1~|~1~|~01/S<2~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~7345B0D6CE890BC78203E95427E1C9BEF92A2374 109775~|~2~|~2~|~02/STR~|~Resurface US 40 in Clark County with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~7A816AED21D9D470D7BB4F06956F9F0F854531F7 90356~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~AFC6D4459145579A98BC6D827978AD868F6BDB4A 107342~|~1~|~1~|~01/NFA~|~D09 PM FY2024 (B)~|~21 - Safety~|~8605E96539028E263CA12952D5D7C6E33AC04817 101291~|~1~|~1~|~01/NHS~|~SAN-20 & WOO-20~|~05 - 4R Maintenance - Resurfacing~|~ED92CB790035D3FC42B351B04439B90E16A95639 101291~|~2~|~2~|~02/S>2~|~Plan split for all work on WOO-65~|~05 - 4R Maintenance - Resurfacing~|~5CF8A0B07DB959DE8FC2E3560903F3ACD9F5A1C4 123746~|~1~|~1~|~01/NFP~|~District-wide systematic RPM replacement project~|~21 - Safety~|~F7D220F1E64C888C454A0F61BF13D556A5FDF44B 124815~|~1~|~1~|~01/SAF/HOL~|~Pavement marking project (various routes) utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~994310278B0B190941F84CB0A217E544BB765EF4 117612~|~1~|~1~|~01/BRF~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~AC4232994D7025C03964CD80CF2E33A2C97E2C5D 98848~|~1~|~1~|~01/NHS/SAL~|~Signal or flasher pole replacement on the NHS~|~21 - Safety~|~83873CBDD812F3BC4AB8BCD79E7E4BD734E93CA1 98848~|~1~|~2~|~02/S<2~|~Signal or flasher pole replacement on the Non-NHS but on State Routes~|~21 - Safety~|~9F3599993B45E6428639FF777CCC5C3CBD20F8E3 98848~|~1~|~3~|~03/S<2~|~Signal or flasher pole replacement on the Local route~|~21 - Safety~|~1097FA3BCAA17C14ABA0F2629B6A00A68BF05189 95817~|~1~|~1~|~01/NHS~|~Urban paving eligible items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~14A65BDC4498D7CD8B95F2D738D77F2A41F5EE19 95817~|~1~|~2~|~02/NFP~|~urban paving ineligible items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~97B1ECA4BBF2D98D8CD43CFED63334EC64ACA8B1 95817~|~1~|~3~|~03/SAF~|~Safety plan split~|~21 - Safety~|~E8B7F64D93027A92BEA207FF782C19393F0795A5 95936~|~1~|~1~|~01/NFA~|~OEPA~|~44 - Other~|~C80B354F64FEDCDDBE944E7CBCE4127E768459CB 126040~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~957E42A6F5235D18D7600F27667299F7C0BDC223 106989~|~1~|~1~|~01/STR~|~GSMP slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~696ED12887C6D6BF74102B1F03BBCE9CBB1D3560 101318~|~1~|~1~|~01/IMS~|~Paving work on interstate.~|~05 - 4R Maintenance - Resurfacing~|~401C3D8AD24DF4817919FFEF650148C4696D41B4 113093~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0C53AD16BBA8A733D90F3A1545E1A4E3AEB310DA 113093~|~2~|~6~|~06/NHS~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~F7EC19998F10CA1EBD07A03713D12A76592A4911 113093~|~1~|~4~|~04/STR~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~DA600208948A73A228E7389E5925B59094FADE52 113093~|~1~|~5~|~05/STR~|~Bridge preventive maintenance 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~1B8B2DC8A97F3F1C6041B554E0FFC1DCE3B834FE 113093~|~1~|~2~|~02/NHS/RAVE~|~Resurfacing, urban paving.~|~05 - 4R Maintenance - Resurfacing~|~99E20F71DF53243AB7DC6CA7981E87C0A8BC2738 113093~|~1~|~3~|~03/NHS/RAVE~|~Full and partial depth pavement repairs.~|~04 - Reconstruction - No Added Capacity~|~F00B875C2FDCF77F7173899FCE083CD779D74F45 80541~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for pavement replacement and and addlane.~|~03 - Reconstruction - Added Capacity~|~7B92AD2F2F727AC8FAF3A3AC5789ACB8AF733BA7 112799~|~1~|~2~|~02/NFP/GRAN~|~100% Local Plan Split for Federal funding ineligible items~|~28 - Facilities for Pedestrians & Bicycles~|~7B5320B1DC9C2D4730C9562AE0733FAC5B1EAEF2 112799~|~1~|~1~|~01/CMQ/GRAN~|~Construction of roundabout at SR 661 and New Burg Street to reduce left turn queues.~|~04 - Reconstruction - No Added Capacity~|~8FD20766F778C9A639C87EF1FAD6EC5E6CBDAAAC 94820~|~1~|~1~|~01/SAF~|~Replace roadway markings on all 305 miles of roadways in Clark County.~|~~|~6A7772C89D30822F5085BF2D9BE18204F6129735 76749~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~04 - Reconstruction - No Added Capacity~|~02E162C6A568321A506F5C8BE9C79DA4411C5E7C 126145~|~1~|~1~|~01/STR~|~Resurfacing SR 37 and SR 47~|~05 - 4R Maintenance - Resurfacing~|~62877C74644A8426651D0BCBE34ACC26894657AE 121611~|~1~|~1~|~01/MPO~|~Plan Split for CRP eligible scope.~|~28 - Facilities for Pedestrians & Bicycles~|~56EE7F476E19CFA436E99608F55B5ED2FDF0EAF2 100458~|~1~|~1~|~01/S<2~|~Installation of sidewalk and curb ramps on Gettysburg Avenue and painting and upgrading lighting on the US 35 bridge over Gettysburg Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~CB79F7FB4B02EAC76436562F55D674B634E89754 121433~|~1~|~1~|~01/STR~|~Pavement repair STP rural~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0E8F5036A053E36DCB10DA4EDF6A0F272F6CFE10 121433~|~1~|~2~|~02/S5K~|~Resurfacing ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CEDECA7B61788D03BDA85AE58F1F7185E6C667A8 93739~|~1~|~1~|~01/SAE~|~Install sidewalk with curb and gutter and ADA curb ramps along Gardenia Avenue, Warren Avenue, Carnation Drive, Poppy Drive, Primrose Drive, Magnolia Drive and Laurel Drive. Carnation: Defiance ST to Gardenia Ave Magnolia: Gardenia to Laurel Primrose: Existing sidewalk to Laurel Poppy: Laurel to Gardenia Warren: Existing sidewalk to Poppy Laurel: Magnolia to Poppy~|~28 - Facilities for Pedestrians & Bicycles~|~34D5D214E596C27EF8B9C737D75DA424519C91B7 111234~|~1~|~1~|~01/SAE~|~Construction Plan Split for Pavement Markings~|~21 - Safety~|~4E61F3A88DA8BE1C785DC706E0F4400C588B5804 124640~|~1~|~1~|~01/SAF~|~Upgrade pavement markings~|~21 - Safety~|~38747692DBD24768F03C60F1434062D1AA0A9D79 120455~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~0448B781F279379A0A26096D4DDFCAF4BAA5064B 120455~|~1~|~2~|~02/NFA~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~DD3F666986196C8FBFC80C1F870928626ABD154F 80076~|~1~|~4~|~04/NHS~|~'04/NHS/PV/ " - Undetermined (80% Federal) / (20% State) - No CAP - New pavement construction on: 1) Lic-SR 79-04.54 to 04.92;~|~04 - Reconstruction - No Added Capacity~|~5AF89B048863101F99DD8E7CE8A060E1F9B67918 80076~|~1~|~3~|~03/S<2~|~'03/S<2/PV/ " - Undetermined (80% Federal) / (20% State) - No CAP - New pavement construction on: 1) Lic-SR 79-03.83 to 04.14;~|~04 - Reconstruction - No Added Capacity~|~6230F14EB0F582F6638A7B142C2445DCE6306322 80076~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - Undetermined (90% Federal) / (10% State) - No CAP - Replacement of 4504747 Lic SR79 4.36 Intersect: IR 70 #; BR Eligible for Replacement: Length=255 SD/FO(1) SR=78.0 DSR=4~|~10 - Bridge Replacement~|~93ADDCDEA1E7DAFBB624B4A80762B85FF181EFCE 80076~|~1~|~2~|~02/IMS~|~'02/IMS/PV/ " - Undetermined (90% Federal) / (10% State) - No CAP - New pavement construction on: 1) Lic-IR 70-13.67 to 16.09; 2) Lic-SR 79-04.14 to 04.36; 3) Lic-SR 79-04.40 to 04.54;~|~04 - Reconstruction - No Added Capacity~|~DB4BF5B27755EE995B7331335485B53F256B8484 117358~|~1~|~1~|~01/BRF~|~Bridge rehabilitation. All work is included in this plan split. ~|~13 - Bridge Rehabilitation~|~F485C2CF40022BBD99AFE4B1FAD547E0BAAC489F 105347~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 6: Construction of a new bridge over the Mill Creek, south of the WHV to provide contractor access for future construction. In addition, relocation of the bypass track on the east bank of the Mill Creek further east, to create space on the east bank of Mill Creek for the future construction of a long-span bridge tower without the need to cross any rail tracks.~|~08 - Bridge - New Construction~|~9711DFFAE4EBB9AA7273BE2DBBFFB704A5CC702E 127026~|~1~|~1~|~01/S>2/PICK~|~upgraded multi-use path in the City of Pickerington.~|~28 - Facilities for Pedestrians & Bicycles~|~CE4B665982E7A600E937088B64AD2320140499FA 113735~|~1~|~1~|~01/SAF~|~Construct a roundabout at CR13 (Worthington Road) & CR106 (Lewis Center Road)~|~21 - Safety~|~521E6FD028A550A25208836792E9F091720A27F4 121012~|~1~|~1~|~01/NFA~|~Plan split to resurface in Hueston Woods State Park~|~28 - Facilities for Pedestrians & Bicycles~|~A69370F8760B5B9A5FD2DEC1972B493CE31D9199 97489~|~1~|~1~|~01/NHS~|~Project is to replace bridge HAS-250-0081 (SFN 3401472) with a new single span structure.~|~10 - Bridge Replacement~|~2F5E09B1975FF3BBF054E17853C9F92E0117FF65 112895~|~1~|~2~|~02/STR~|~UNI-36 from 0.00 to 1.74~|~05 - 4R Maintenance - Resurfacing~|~C684C723F0AC1F3924876B206656150D275C058A 112895~|~1~|~1~|~01/NHS~|~UNI-36 from 1.74 to 4.43 and UNI-4 from 0.00 to 2.57~|~05 - 4R Maintenance - Resurfacing~|~22F193129D4786EB4D4350B80C3E0CB50F1133DD 116375~|~1~|~1~|~01/CMQ~|~Project's primary Plan Split for CMAQ funded scope~|~21 - Safety~|~8DC8337F7DDC126A74A8BA8DB793D5D642C1F535 116375~|~1~|~2~|~02/NFA~|~Plan Split for 100% locally funded scope items, including items that would otherwise be addressed by a '"cost to cure" during RW process.~|~44 - Other~|~768CA8A9BAEACF1B383F3274F3C0E815C0125370 112560~|~1~|~1~|~01/MPO~|~NOACA funded rehabilitation of Rittman Road~|~05 - 4R Maintenance - Resurfacing~|~3B7340E1B50CD923DB8F30C4476C3AEE2B89EC58 102059~|~1~|~1~|~01/STR~|~Build modern roundabout on rural route.~|~21 - Safety~|~A3483D99BC7497B4AEC7ADD1127F1B980BB69293 102059~|~1~|~2~|~02/STR~|~Waterline relocation~|~21 - Safety~|~D340C727F82CDE640E448E280CE701ED8288405B 116422~|~1~|~1~|~01/NFP~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11.~|~21 - Safety~|~FCFC3ABE3113F09A5E0D6965B8320DCC434F8694 116422~|~1~|~2~|~02/IMS~|~Replace highway lighting at TUS IR 77 Stone Creek interchange~|~21 - Safety~|~34D9A2BFDDADB2B765953FF60A72593D1E07BA42 99936~|~1~|~1~|~01/IMS~|~District wide mowing contract.~|~44 - Other~|~5A74E113C70E01DA5E723CA45B0B61C4EB2D8BB3 108394~|~1~|~1~|~01/STR~|~Landslide repair project. MOE CR 12 11.10-11.40, DSR MOE-018. Rural other federal aid funded 80 federal/20 local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FDDD90DB85DA6C82C42A93B090799A11A8B2915F 98213~|~1~|~1~|~01/IMS~|~Culvert work at IR270/US3 interchange~|~04 - Reconstruction - No Added Capacity~|~182B16C48F491EA07A82A2EF7B4B35893CABEF73 98213~|~1~|~2~|~02/NHS~|~Work on two culverts on SR 315~|~04 - Reconstruction - No Added Capacity~|~8C5D3484EE301C82D60F493C2E79A65924AF5362 83500~|~1~|~2~|~02/IMS~|~90/10 fund split for use with federal IM funds for the 2 ramp bridges: 1808605; CUY-090-2264W & 1808664; CUY-090-2276E. These structures will be replaced with engineered fill retaining walls.~|~13 - Bridge Rehabilitation~|~247A01853F2991B70C58B87D5CB63BBAB65EDE11 83500~|~1~|~1~|~01/BRO~|~80/20 fund split for use with federal BR funds for the structure over IR-90: 1808559; CUY-090-2275~|~13 - Bridge Rehabilitation~|~9084EE8AD3559AEE0D4E0E53216B0F730E331797 83500~|~1~|~3~|~03/ENH~|~80% federal / 20% local funding split using MPO enhancement for SFN 1808559 (Eddy Road bridge over IR-90)~|~13 - Bridge Rehabilitation~|~D0AD2875EBBF43182464A91B1DA6597767E1E52B 89099~|~1~|~1~|~01/IMS~|~Pave culvert inverts at:MAD-71-11.56FRA-71-27.9001/IMS/OT/~|~~|~5346107243367F8BC797A5A6521A315709AAE1DA 89099~|~1~|~3~|~03/S>2~|~Pave culvert invert at:DEL-257-3.5803/S>2/OT/~|~~|~650C1ECB71C2160F4E39C1F5DD0CB3BC674E1DB8 89099~|~1~|~2~|~02/NHS~|~Pave culvert invert at:UNI-33-15.0802/NHS/OT/~|~~|~7877798BA083587D3E30E6634B60966F579F03FC 89099~|~1~|~4~|~04/STR~|~Pave culvert invert at:DEL-257-4.87MAD-42-22.86MAD-665-10.71MRW-19-3.35MRW-529-3.19PIC-762-1.9804/STR/OT/~|~~|~F8D5E24FCB2E335D047E5B2953AA5E5F5DC1EB0F 112698~|~1~|~1~|~01/NFP~|~Pavement Markings~|~21 - Safety~|~D7764F10CFCDB3120A3DD010DED46FE3858D2ABB 112698~|~1~|~2~|~02/SAE~|~Install centerline rumble stripes on US 20 between Village of Wakeman and the City of Oberlin, HUR 020 (SLM 26.23-28.65) and LOR 020 (SLM 0.00 ? 4.55).~|~21 - Safety~|~2ECAD84549DEAC9D2165BD18B0941E34C2A1825B 101345~|~1~|~1~|~01/S5K~|~bridge rehab.~|~13 - Bridge Rehabilitation~|~8EC9B512E8AF847A28DE47057CD2C35362FF7D15 124344~|~1~|~1~|~01/BRO~|~Repair bridge carrying US 22 Westbound over SR 9 and US 250 Eastbound to correct damage from over height vehicle strike.~|~17 - Construction Engineering~|~C63A39FD16A32BB1C88885BF24AF70440B9D0ACF 107809~|~1~|~1~|~01/NFA~|~OH18-01 ER Event. Landslide repair project. MOE 255 14.30. Not on the federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DC2C6EB030048BB5C3BC5BC288F25BCE4E367ED4 97762~|~1~|~1~|~01/NFP~|~Construct new Mt Sterling Outpost in Madison County~|~44 - Other~|~66C0F21627C7999F040CD4D1E15B99D8B2AA99A6 115336~|~1~|~1~|~01/MPO/NORT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~BA3F6672154394ADE2FEBCBBBA6CE2E453AF6655 106319~|~1~|~1~|~01/CMQ~|~Colonel Glenn Highway: University Boulevard to Old Yellow Springs Road. Installation of new sidewalk, pedestrian crossings with ADA compliant curb ramps, signal improvements, construction of retaining walls, and installation of lighting for the pedestrian infrastructure.~|~28 - Facilities for Pedestrians & Bicycles~|~3D8A503D40E5F1EC453D3BFED573F4A4F9C04C1F 106319~|~2~|~2~|~02/MPO~|~Colonel Glenn Highway from west city corporation limit to North Fairfield Road. Addition of shared use path, decorative walls, decorative lighting, gateway columns, and landscaping .~|~28 - Facilities for Pedestrians & Bicycles~|~040BEB7B24666998591172806242CA8F52DAC2DB 102099~|~1~|~1~|~01/NHS~|~This is for signal upgrade on NHS route.~|~21 - Safety~|~868E0444CBAE4BFE3BABE1C83A00D4AB1EA5A806 113740~|~1~|~1~|~01/SAF~|~Multi-Use Path along 161 from Ambleside/Satinwood Drive to Maple Canyon Ave.~|~21 - Safety~|~F0BCAED6C00235DACE87A15A9C783FF6F17CF3DB 119532~|~1~|~1~|~01/STR~|~Plan split for rehabilitation and superstructure replacement of non-federal bridge~|~04 - Reconstruction - No Added Capacity~|~9312D88B17EB099285B14126BF97BF37920DAD3A 123263~|~1~|~1~|~01/SAF~|~Lighting Maintenance.~|~21 - Safety~|~E89BC76009E1690D1EE60F5B986898AA25CF473C 123263~|~1~|~2~|~02/SAF~|~Lighting replacement.~|~21 - Safety~|~7348CDADA925AF00C309B52BABB3F60DAF94EBE2 86655~|~1~|~1~|~01/MPO~|~COMPLETE CONSTRUCTION OF THE PRIMARY GATEWAY AT THE INTERSECTION OF CENTRAL AVE/FIRST STREET BY INSTALLING A GATEWAY ARCH FEATURE; CREATE A SECONDARY GATEWAY AT THE INTERSECTION OF FIRST STREET/LINDEN AVE USING LANDSCAPE AND HARDSCAPE ELEMENTS; CONNECT THESE TWO GATEWAYS BY EXTENDING EXISTING STREETSCAPE ELEMENTS ALONG FIRST STREET BETWEEN THE INTERSECTIONS on South First Street from Central Avenue to Linden Avenue including both intersections in Miamisburg..~|~31 - Landscaping & Other Scenic Beautification~|~DA74E37E206D79CD2DC04D113828FBD76D25A8DD 101006~|~1~|~1~|~01/NFP~|~All work is in this split. 100% state funds from the District Preservation budget. SAC 4PS7~|~21 - Safety~|~E000E09892F2F3555B7DAB94DE72FB10DB6306AA 110898~|~1~|~1~|~01/SAF~|~Convert TWSC intersection into a single-lane roundabout at ERI-4-4.65 / SR 99 / Skadden.~|~21 - Safety~|~857672A0B5EB667BCF74FBECE4CE92C78F8F266A 110898~|~1~|~2~|~02/STR~|~Erie County Water Line relocation.~|~21 - Safety~|~909256A91E898786B6DE867D8659816AB0A12BD3 101062~|~1~|~1~|~01/NHS~|~Microsurface various routes in Montgomery County: MOT SR 4 SLM 4.30 to 11.88 (with repairs 11.58 to 11.88) = = MOT SR 725 SLM 8.31 to 10.13.~|~05 - 4R Maintenance - Resurfacing~|~9274B8C8709B853213AFB2D0EDDDAC8212562EC3 101062~|~1~|~2~|~02/STR~|~Microsurface US40 in Montgomery County: MOT US40 SLM 0.00 to 5.64~|~05 - 4R Maintenance - Resurfacing~|~C8BDA5D719CA8B51A8702F658186BCFD5CB42110 101062~|~1~|~3~|~03/S<2~|~Microsurface US40 in Montgomery County: MOT US 40 SLM 5.64 to 6.22~|~05 - 4R Maintenance - Resurfacing~|~8D75FEB7562D914FF9C5E21916AE366BD173E86E 107756~|~1~|~1~|~01/STR~|~Covers all work to replace bridge~|~10 - Bridge Replacement~|~0FC4448E7F8258054F9057082A52D40841531361 114215~|~1~|~2~|~02/NHS~|~NHS plan split for CPR joint treatment - SR 420 & SR 2~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4644802F880A9EA28DE2642167C2068F6E08174D 114215~|~1~|~1~|~01/IMS~|~IM - interstate CPR joint repair plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~59755FC08826337EB2906A00A4B8B8B2249FE01B 88386~|~1~|~1~|~01/BRO~|~Deck replacement with minimal approach roadway work on SFN 0602132 AUG 75 0498 R~|~~|~4CBD13CF2204A8F44C6FB3C7C756F1CF3A242507 88386~|~1~|~2~|~02/IMS~|~Deck replacement with minimal approach roadway work on SFN 0602043 AUG 75 0498L, SFN 0602108 AUG 75 0515L, and SFN 0602132 AUG 75 0515R.~|~~|~A2B602E73D76D05DE7DD5C98546AF6F6C6F8F8BC 115322~|~1~|~1~|~01/STR~|~Scour Remediation ~|~47 - Bridge Preventive Maintenance~|~12DBC4574E31B2201B717D88A9872C1BCD38C3B6 109944~|~1~|~1~|~01/S<2~|~CEAO Funding~|~05 - 4R Maintenance - Resurfacing~|~6BD618642E1086D426A3C25940D4DFBCC6D6E2C3 109944~|~1~|~2~|~02/S5K~|~Plan split for 100% Local items~|~05 - 4R Maintenance - Resurfacing~|~43CE3DB8F7059146782BAA07D91B1903067EF4CF 112506~|~1~|~1~|~01/S>2~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~458D29E58135DD024E6C01F2A2E3C6C3288E478C 95397~|~1~|~1~|~01/ENH~|~Construction of a new 7.1 mile multi-use trail along an abandoned rial corridor that roughly parallels US-22/SR-3. Signed trail heads with gravel parking to be constructed at termini (Melvin Road and Borum Road). A signed trailhead with a paved parking area to be provided in the Village of Sabina.~|~28 - Facilities for Pedestrians & Bicycles~|~5810DD1C3E5247A73F43674A55164E5839212754 95397~|~1~|~2~|~02/ENH~|~Plan Split to cover costs associated with dispute resolution.~|~28 - Facilities for Pedestrians & Bicycles~|~3D2C1D7628A3147C59877FBA2FF44D364B8672CC 97797~|~1~|~1~|~01/BRO~|~SFN 5710510, MOT-741-0841 over Conrail RR, GM Access Road - 1. Remove existing latex modified concrete overlay using hydrodemolition and replace with SDC overlay. 2. Replace torn seals in expansion joints. 3. Reset 6 rockers out of adjustment on rear abutment. 4. Seal concrete surfaces.~|~~|~CE27B6A460400C7A43768841B60077EBC76CF968 82582~|~1~|~1~|~01/MPO~|~Widening of Old SR74 from Olive Branch-Stonelick Road to Armstrong Boulevard, providing a 3 lane section with paved shoulders and curb and gutter drainage. Also included is access consolidation where feasible, sidewalk, and ITS applications. Modification to the existing structure spanning Shayler Run west of the Amelia-Olive Branch intersection will also be required, as well as roadway profile adjustments to eliminate sight distance problems. Sponsor - Clermont County TID~|~21 - Safety~|~D604F8A16499309D71CA6E949D3EF5CAFB5466F5 126123~|~1~|~1~|~01/STR~|~Replace bridge over the Rocky Fork Creek~|~10 - Bridge Replacement~|~4CC2CBCE3EB7B2D9CC3C5ECDF396EC02A2318EB2 119986~|~1~|~1~|~01/MPO~|~Install Electric Vehicle charging stations in two locations~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~22DC99CD44E6F00B8775CE0BC50E038C201F4E9E 119986~|~1~|~2~|~02/NHS~|~Materials for EV project~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~95A953ADBCB6F397E309B31842A191FF5BDEC6C6 122032~|~1~|~1~|~01/STR~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~96A2A0F422C548BD2C4F3C793D11979058D7C0C4 96450~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-TR 190-1.05 (SFN: 0931616) including vertical and horizontal alignment improvements, and roadway pavement widening to improve roadway safety.~|~10 - Bridge Replacement~|~7E49AB7FA8AB7514171F7E05BF50E636B4B65AB3 104065~|~1~|~1~|~01/NHS~|~JAC 35 0.43 culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~0BD2EAE8922F13B215E57C044C3511B489CB5BBF 114890~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DAB239B2A3AFAB307DF46106E08408214839C4BC 114890~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F23B9F049EDA3016155964ABC138B1E2BD80AF7D 114890~|~1~|~2~|~02/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5F5251CDCACDC6BF2CC802E4359211A63EE38720 114890~|~1~|~4~|~04/IMS~|~Bridge preventative maintenance work.~|~47 - Bridge Preventive Maintenance~|~2C4724A6055913FBF054E16B0CC457443832ED87 75961~|~1~|~1~|~01/IMS~|~Resurface existing two lanes (both east and west bound) and other roadway related items.~|~~|~A3E5C33228AFE4C2D409C6543FAAC0D3F7B3D057 107682~|~1~|~1~|~01/S<2~|~Resurfacing on US 224, SR 15, SR 65 and SR 109 using district preservation funds. (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~5A89D367BAC66A6F1DC51AECFCDF0F4A5C74E4B3 107682~|~1~|~2~|~02/STR~|~Resurfacing on SR 189 and SR 190 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~08EF176F161B67A9B3F78CB699D53D750BD2EF15 107682~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~AE8DED6C68F72C6E035E13041323F80E5234B080 97315~|~1~|~1~|~01/STR~|~ROS CR 167~|~05 - 4R Maintenance - Resurfacing~|~2D6161466B00F64811BA7CD0AFEA1560BB8E53F1 102027~|~1~|~1~|~01/SAF~|~Turn Lane Addition and Section Improvement - 90/10 Fed Safety/Local Funds. Also using Earmark Funds TRC.~|~21 - Safety~|~87E813EEDE617A4EEB0A0574C9A63BFB400A6510 102121~|~1~|~1~|~01/STR~|~Rockfall repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E4E55D71711FFB710C976B6FC853BC61B91A736 88334~|~2~|~2~|~02/BRF~|~Bridge replacement and realignment~|~10 - Bridge Replacement~|~0B0C4ECCE6A31DF90949FE5295E090E7723B8D92 88334~|~1~|~1~|~01/BRF~|~Bridge replacement and realignment~|~10 - Bridge Replacement~|~7E2B40C71260AD8479CF753F3B7336CB4FCD211E 125229~|~1~|~1~|~01/MPO~|~Full depth reconstruction of sections of SR 503 from Clay Street to Panther Way in the Village of Lewisburg.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~342AC0B2DEF5B0D64A4BE38164D2B80E27A683AE 127101~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~A049948D95E0A3E5943884AEB4663B5EFB381BEF 114887~|~1~|~1~|~01/IMS~|~All items of work associated with pavement repairs and some miscellaneous items~|~05 - 4R Maintenance - Resurfacing~|~B37D2723036274026F59EF4A4CF5921095EC0765 107338~|~1~|~1~|~01/NFP~|~Construct new VIN Co. Full Service Facility (VIN Gar.). 100% State funds on State land (recently purchased).~|~01 - New Construction~|~A028858C900E43152E9092F23FFCC6E174B06E80 120161~|~1~|~1~|~01/S5K~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~9F2AF719C7C5C7596D0219F5EE960D85ED27FC5E 98598~|~1~|~1~|~01/IMS~|~Rehab the following culverts: HAM-275-0688, HAM-275-0702, HAM-275-1157, HAM-275-1180, HAM-275-1918, HAM-275-1972, HAM-275-2066, HAM-275-2960 and HAM-71-0780~|~44 - Other~|~BAF56C1D7FC0BA85E8ABB70C81747485E57282A5 126932~|~1~|~1~|~01/NHS~|~All work included in this plan split.~|~04 - Reconstruction - No Added Capacity~|~F339676857F17F4F1326B4F64DFA749A0F7BB5DD 125233~|~1~|~1~|~01/S>2~|~Widen Feedwire Rd (CR-21) in Greene County to provide additional capacity. The intersection of Wilmington Pike (CR-85) and Feedwire Rd (CR-21) will be widened with additional turn lanes.~|~03 - Reconstruction - Added Capacity~|~64C804F0FD49D9256BFF2F3FBC10CDAC09C26B49 94590~|~1~|~2~|~02/SAF/FECO~|~"02/SAF/OT/FCEO" - sign upgrade in on US33A in rural section~|~~|~0153725915C46E85171969D9A5D1366A7634776B 94590~|~1~|~1~|~01/SAF/FECO~|~"01/SAF/OT/FCEO" Sign Upgrade project on CR33A~|~~|~15A38228450DA649C9906681F53ABEAEA1428B3F 98517~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement NHS System~|~21 - Safety~|~F7E40DC1B8081D2C92B9725F966A280F054A6824 96982~|~1~|~1~|~01/IMS~|~Pavement Marking Work Order on various routes within District 4~|~21 - Safety~|~92E17DBDBC0B824DC5214ACD213BD6E9D56E8FAA 107355~|~1~|~1~|~01/IMS~|~Repair non-emergency accident damage to Interstate bridges.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8BA8C3F5A6EBF520C005925C6E27B6EEB06D60A9 107355~|~1~|~2~|~02/IMS~|~Repair damage from bridge hit.Separate plan split requested to track monies for insurance claim.~|~13 - Bridge Rehabilitation~|~302C516EA4E3FDB0F80D1114B76DEDF9A931B3E2 107850~|~1~|~1~|~01/NHS~|~NHS Plan Split: DEL-23-17.75-17.85~|~05 - 4R Maintenance - Resurfacing~|~90241D55F1955A99216FE6A4BDFF89768668CDD0 123621~|~1~|~1~|~01/NHS~|~Plan split for NHS~|~05 - 4R Maintenance - Resurfacing~|~E30DCC965D0A267C48071F05CDBE4A9D79D461A4 124867~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order.~|~21 - Safety~|~BC97B54935D47AF81B418AE3AE7879982410D6DE 98157~|~1~|~1~|~01/S>2~|~Conversion of the existing intersection of Kauffman Avenue and Colonel Glenn Highway from a signal-controlled T-intersection to a modern roundabout.~|~21 - Safety~|~7322FB491DBE2B694F894901CDE73A81CBE6AE5F 98157~|~1~|~2~|~02/MPO~|~The project consists of widening Kauffman Avenue (SR-444), from Euclid Avenue to Lindberg Drive from 3 lanes to 4 lanes. Also, replacement of the existing traffic signal at Kauffman and Garland with mast arms, repair of deteriorated sections of asphalt and concrete pavement, drainage improvements, storm culvert extension, and replacement of a section of the adjacent Wright Brothers Huffman Prairie Bikeway.~|~03 - Reconstruction - Added Capacity~|~458A92DB4180C1FF3279F7920AC3D5866C468A2E 122887~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~~|~98C53071E3CB0268376B9BF1F792BD1D28539C99 122181~|~1~|~1~|~01/NFP~|~NEVI Round 2B I-71-A~|~~|~C7DD450E62573992074ACD9477EC841E56A965D6 109769~|~1~|~1~|~01/STR~|~AC Overlay~|~17 - Construction Engineering~|~4730F0A12A3E9BDA97684EC872BC057316243073 112744~|~1~|~1~|~01/S>2~|~Columbus Urban Area Plan Split: DEL-521-2.29-3.15~|~05 - 4R Maintenance - Resurfacing~|~71796016826C9375CC1AF512A6FCA96C34DEABEA 112744~|~1~|~2~|~02/STR~|~Rural Plan Split: DEL-521-3.15-7.86 UNI-47-0.00-7.57~|~05 - 4R Maintenance - Resurfacing~|~3407B0ED1EDC979076E0960A71D131D8C5DB2DFB 122506~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes~|~21 - Safety~|~5B9A3C7D8FFD2AE0C138B3C4856B28581C0B40C2 120469~|~1~|~1~|~01/NHS~|~Work for pavement markings along SR-176~|~21 - Safety~|~AEE412C6DDD8E960D40B3F85F997EA375145072C 96085~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for the construction of a 1000 ton salt storage building near the SR 93/ SR 662 Intersection im Muskingum County~|~~|~D61F0F0182D6204922596E13DDA4D15BD252DAE9 116212~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into roundabout~|~21 - Safety~|~0FE1D6AFAC290190733287BCDDDBA1476570213C 117974~|~1~|~1~|~01/STR~|~Slope stabilization project. ATH 144 6.04. Funded 80 Federal/20 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7EA5A77C0E7497E2684E1AC303A16E55E2426E6D 108849~|~1~|~1~|~01/STR~|~Replace the superstructure of bridge PRE-40-0673 over Bantas Fork.~|~13 - Bridge Rehabilitation~|~56922A8B5E1647A4BFF04235741D06052EC04B3D 123060~|~1~|~1~|~01/STR~|~Slide repair in the village of Peninsula.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~14BC5494FA44F44A2A6EAC798A224D8515D3F32E 117324~|~1~|~1~|~01/NFA/FCEO~|~Replacement of superstructure carrying Christmas Rock Road over Arney Run (SFN 2336081)~|~13 - Bridge Rehabilitation~|~8A194406F69EAE530EF94E30AE72C2C693F27454 117324~|~1~|~2~|~02/NFA/FCEO~|~100% Local Plan Split for non-eligible bridge items (non-Superstructure) included in the project. Replacement of superstructure carrying Christmas Rock Road over Arney Run (SFN 2336081)~|~~|~62BBFAE520B96DE9839E2346F35AA618A830D144 105368~|~1~|~1~|~01/STR~|~AC Overlay with repairs on: DAR-49 SLM 26.33 to 32.03DAR-49 SLM 25.31 to 26.33~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2FB787371681F6386EEA02F6C189ACDC2C46B01A 95317~|~1~|~1~|~01/CMQ~|~Propane Fueling Startion - provide a clean alternative fuel for City vehicles in the City of Springfield.~|~~|~DEF34C0D8550AACC14DDD74066900EFDD822D871 102884~|~1~|~1~|~01/STR~|~Resurfacing HOL-83 from Millersburg to Holmesville NCL.~|~05 - 4R Maintenance - Resurfacing~|~76310A9C0B5A5B7D0FFDB0537B0834249B9C16AE 95543~|~1~|~1~|~01/STR~|~Resurfacing of SR 60 from SLM 0.00 to SLM 2.97, and from SLM 3.71 to SLM 10.33 inclduing pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~08EB5AEF5571C6BAE49A46219C4ADF20BAB11C49 95543~|~1~|~2~|~02/NFA~|~General System Resurfacing including pavement repairs and pavement marking on HOL-60 from SLM 2.97 to SLM 3.71 (Non-FAS).~|~05 - 4R Maintenance - Resurfacing~|~E79B57E154DE6AA66571781F03C7F2CBBBD3C04F 120088~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~684B578D0DD35CA7D596EE09F2D4D9E03DA2AD82 91984~|~1~|~2~|~02/STR~|~Three span concrete slab deck removal and replacement with minimal approach work, possible guardrail end treatment upgraded. SFN 1903845 DAR SR 705 9.47 Hosapple Ditch.~|~10 - Bridge Replacement~|~A19AF60752C24E6393D90031F4C22C7258DC265C 91984~|~1~|~1~|~01/STR~|~Three span concrete slab deck removal and replacement with minimal approach wor, possible guardrail end treatment upgraded. SFN 1903810 DAR-SR-705 9.05 Mile Creek SFN 1903969 DAR-SR-705 10.03 E Baurer's Ditch.~|~10 - Bridge Replacement~|~FB3A2737C143C7E175D66AD159F26A2C58A5267D 113889~|~1~|~2~|~02/NFP~|~Plan split for storm sewer replacement at 100% local funding.~|~04 - Reconstruction - No Added Capacity~|~B7646717C21FD4A33FA0AAF3A07485C3D73AB886 113889~|~1~|~3~|~03/NHS~|~Plan Split for incidental bridge rehabilitation work~|~13 - Bridge Rehabilitation~|~3FF8B70D91D08F3AD43327A0A5AAA69970CE3FA8 113889~|~1~|~1~|~01/S>2~|~Plan split for converting Harper Rd to DDI and includes ramp modifications for US-422.~|~21 - Safety~|~B1E090DBECC1B2017F42A15D50FFB1AB200EFEDF 108944~|~1~|~1~|~01/IMS~|~Federal Emergency Project 2018 - 4BY7 (90% Federal) / 4BE7 (10% State) - No CAP - Installation of barrier wall along Gue-IR 70-19.65 to retain sloughing material.~|~44 - Other~|~C35F392B17C9EBCCEEB15E197C3E860317000CA6 107322~|~1~|~1~|~01/IMS~|~Split for interstate lighting upgrade~|~21 - Safety~|~9742C30CF84C60542FAC470952E24BE8DBB294EF 100604~|~1~|~1~|~01/S<2~|~Microsurfacing of COL-14 from 12.67 to 12.83 (STP Urban section)~|~05 - 4R Maintenance - Resurfacing~|~4283166A4304BD37C2A99D9459A2494FF1785C1C 100604~|~1~|~2~|~02/STR~|~Microsurfacing of COL-14 from 12.83 to 19.26 and COL-170 from 11.42 to 14.96~|~05 - 4R Maintenance - Resurfacing~|~2910CD3F58B308C3B5029A123D2B3A01BB8670C4 104711~|~2~|~4~|~04/NHS~|~Part 2ROS 23 21.20 Blackwater Rd.~|~21 - Safety~|~3EDD24B088EE56C7D2207EB652C39EB0A70748C2 104711~|~3~|~2~|~02/STR~|~Part 3ROS SR 159 10.10-10.93~|~05 - 4R Maintenance - Resurfacing~|~5F96DAF8FA397BAC4AE0AEFD275984BEF3D36365 104711~|~1~|~1~|~01/NHS~|~Part 1ROS 23 19.46 Crouse Chapel~|~21 - Safety~|~C3D214AAB7C031B5A3A444000393B81A59EF4AF7 104711~|~3~|~3~|~03/S<2~|~Part 3Restripe lanes on SR 159 4.24-4.33.~|~21 - Safety~|~35336E59A04F98558939A467487B4F55DDFD185C 102411~|~1~|~1~|~01/SAF~|~Replacement of existing non-standard guardrail and installation of new guardrail where needed. Berm work will be performed and guardrail will be added where vertical drop-offs are a concern.~|~21 - Safety~|~87D0F6979255CCA982A6A88D34E94727E5FF3732 106825~|~1~|~1~|~01/NFP~|~Various upgrades to vehicle detection, signal cabinets, controllers & communication statewide~|~44 - Other~|~E0ABA503A45EEF4254452557356D1A7E3DA08F52 98671~|~1~|~1~|~01/STR~|~Perform horizontal curve and superelevation improvements, widen the pavement and shoulders, resurface and improve the intersection geometrics on CR 70 (Philothea Road) from SLM 6.21 to 9.28.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3E75F39C94CC6DCAAE0253FB6678E9408D5297EB 96130~|~1~|~1~|~01/NFP~|~Facilities project at Vermilion Outpost~|~44 - Other~|~4ED6C76D5CAC4F6758E41AE4F3947FF80606723A 106414~|~1~|~1~|~01/NFA~|~Replace Shawan Falls Drive Bridge over S. Fork Indian Run~|~~|~6E8B4C4E801C1A720BCA9D3D095789A4CA156711 104983~|~1~|~1~|~01/IMS~|~Part 1: Interchange expansion work~|~04 - Reconstruction - No Added Capacity~|~8FD3D698D82D3CA59968784F8F48ABE8C265B3F3 104983~|~1~|~2~|~02/NFP~|~Part 1: Non-eligible work for bridge parapet fence lettering and attachments on Miller Road.~|~04 - Reconstruction - No Added Capacity~|~9B0F7481E138B2F38AD960ABA7BBE800A920D284 104983~|~2~|~3~|~03/IMS~|~Part 2: I-77 existing lane reconstruction from SR-21 to the OTC in Summit County~|~04 - Reconstruction - No Added Capacity~|~3B618E2D97FCA1F6CEC5D4E74A79451E4EAF989C 104983~|~2~|~4~|~04/IMS~|~Part 2: Widening I-77 from SR-21 to the OTC in Summit County~|~03 - Reconstruction - Added Capacity~|~2D5E30C8A35236CEDA7CB791A70D6390F9AD4E6C 104983~|~2~|~5~|~05/IMS~|~Part 2: Work on the existing structures over Brecksville Road~|~13 - Bridge Rehabilitation~|~B86021616C07793DC85283A842E0AD8B5544833B 104983~|~2~|~6~|~06/IMS~|~Part 2: Work to widen the existing structures over Brecksville Road~|~13 - Bridge Rehabilitation~|~C90E1F985CE548BEAFCAB7A89AB68FFA0BA996E1 104983~|~1~|~7~|~07/IMS~|~Part 1: Work on the existing Miller Road Structure.~|~13 - Bridge Rehabilitation~|~18BA6268C51442CE9496BE279C3554435DB93EEA 104983~|~2~|~8~|~08/IMS~|~First Energy - Ohio Edison costs~|~44 - Other~|~A0CEDC3D4AC8D064F95BCF1BD7400566F4690AAA 104983~|~1~|~9~|~09/NFA~|~109.04 Material buy back, no CE labor~|~44 - Other~|~59BD31F3528F9E267030849FE036FC1BECF92BBB 110011~|~1~|~1~|~01/NFP~|~Reactive Maintenance~|~05 - 4R Maintenance - Resurfacing~|~C0AD88A278465F9D46938370882C43CA10A45DF1 102116~|~1~|~1~|~01/NFP~|~SFN 4806115~|~13 - Bridge Rehabilitation~|~A3AC6265F54B5F61F51510DE6463D9D11EED05BA 100044~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~23CD6D853DD9D05D2C8BA1911F5E700534068139 118680~|~1~|~1~|~01/IMS~|~Split for barrier and lighting replacement. ~|~21 - Safety~|~749F5E88157635FA7A43E8126644F12591A90B25 95312~|~1~|~1~|~01/STR~|~Intersection Improvement project. ATH 56 3.25 and ATH 356 4.77. Federal Aid route, 100% State funds.~|~21 - Safety~|~EFAEEB1C464F824B638AF87597DE93ABB2F839E4 95312~|~1~|~2~|~02/NFA~|~Culvert replacement at Waterloo Park. ODNR funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~5183D193C21894F0475C5A938F664854C562586F 101787~|~1~|~1~|~01/SAF~|~Improvements at Livingston Ave/James Rd intersection~|~21 - Safety~|~5870D164EC54FF29DCD84B96B47430C22BD9EC48 98802~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for eligible resurfacing work items.~|~05 - 4R Maintenance - Resurfacing~|~5FDB0D6893E55F2F5EEE27C18ADD0D9D1BE90DF1 98802~|~1~|~2~|~02/NFP~|~100% local participation on items not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~90814267DCA5C7D5CD5A0DD834A911BE314971C1 105737~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items~|~05 - 4R Maintenance - Resurfacing~|~7957B923EA51C519F683287AC593DA7B0F1B06DF 105737~|~1~|~2~|~02/MPO~|~Plan Split 2 is for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~77B25178527ADA6E2CD79F38ACFBBBD8EF57BA64 87730~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~47 - Bridge Preventive Maintenance~|~D3685376D65B0EC73FE2EB53AFB84F70EF37EC8D 107806~|~1~|~1~|~01/NHS~|~All work in this project. Erosion repair at various location on the NHS. Funding is 80% federal and 20% state funds from the District Preservation Program budget.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~59A5D7E8BD9F62E028216B72659EFB362595E524 83653~|~1~|~1~|~01/NHS~|~JAC US 35 7.83 Rock SlideOn US35, 0.18 mile south eat of its intersection with CR71, it is proposed to regrade an existing rock cut by blasting. 80/20 Split01/NHS/OT/State~|~44 - Other~|~BE9469CF3D077913FD4E45744C6AD59176848544 100655~|~1~|~1~|~01/S<2~|~This plan split is for the COL 267 and JEF 43 intersections.~|~21 - Safety~|~82A9D5283FC4766061262E81359A03D21552A7FD 100655~|~1~|~2~|~02/NHS~|~This plan split is for the TUS 36 and TUS 250 locations.~|~21 - Safety~|~0BE6A5BDEB19FFFCE63B6CED76729B138759EAB8 100655~|~1~|~3~|~03/STR~|~This plan split is for the TUS 258 location.~|~21 - Safety~|~20EC2BF5E36853F64F223CC98C961CAEE8ABE31E 95210~|~1~|~1~|~01/NFP~|~Mowing contract~|~44 - Other~|~4387CB2E17A92DA992609ECE969F0503F0644290 92989~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Kno-SR 586-00.00 to 03.28; 2) Kno-SR 586-03.41 to 11.37;~|~05 - 4R Maintenance - Resurfacing~|~22FA544CF76363ED66EEFA954AA5DDFEAC50A767 92989~|~1~|~3~|~03/S<2/MTVE~|~"03/S<2/PV/MTVE" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving resurfacing with related work in Mount Vernon on Kno-SR 586-12.92 to 13.98~|~05 - 4R Maintenance - Resurfacing~|~51B61DC609DE3AEA8C9AAF8EC63EA326426F9346 92989~|~1~|~4~|~04/STR~|~"04/STR/BR/ " - District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Repairs and 3" overlay of approach slabs and concrete slab deck.~|~13 - Bridge Rehabilitation~|~8B4BA744EBED7EF54E9773513696358D0E403256 92989~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Kno-SR 586-11.37 to 12.92~|~05 - 4R Maintenance - Resurfacing~|~543B0CE28D545EB03F5875D52CE8FB134135B939 103488~|~1~|~1~|~01/MPO~|~Interconnect and upgrade traffic signals within the City of Troy.~|~21 - Safety~|~148CF122BE1C75BE9B6C83B6ABFCE0131FC5C3C7 114989~|~1~|~1~|~01/NHS~|~Guardrail replacement.~|~21 - Safety~|~D87E193452252DCA47F8F8CC19F98F82772290C7 98486~|~1~|~2~|~02/NHS~|~Resurfacing SUM US 224 from 14.30 to 14.84.~|~05 - 4R Maintenance - Resurfacing~|~5247FE8E512A1D546D236C9F0E3552BC601DDA09 98486~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing SUM US 224 from 11.25 to 12.70, urban paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~6395D6160A098FD986235AFAD5DED751CEBCE9E2 98486~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~E25E1437D5EB672D7BD30CF4CF1A7B8247334CB2 98486~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~6888E6FA5FC6AF850F3EB389771738B8D94398A3 98486~|~1~|~5~|~05/MPO/AKRO~|~100% City of Akron items including full depth pavement repairs and catch basin reconstruction.~|~05 - 4R Maintenance - Resurfacing~|~46CBB52E52AF37A2E1BE17457FC19253D56BE85F 98486~|~6~|~6~|~06/NHS~|~100% City of Akron Change Order for additional pavement striping.~|~05 - 4R Maintenance - Resurfacing~|~8556A6F4E544FEEFEE947778B05BF0B8C72D6BFB 101514~|~1~|~1~|~01/S<2~|~CO Inspection~|~17 - Construction Engineering~|~C20DA77725E6B75BABB3D1C2C4B888CCB7E4D1FC 101514~|~1~|~2~|~02/S<2~|~CO Inspection~|~17 - Construction Engineering~|~4F57B70F761F47823D5F548B2ED06F056FB1C612 101514~|~1~|~3~|~03/S<2~|~FY2018 Balance~|~17 - Construction Engineering~|~B02F794F39EB02142F0DF13572E48F15A83A29AC 110346~|~1~|~1~|~01/SAF~|~CEAO Safety funds plan split~|~21 - Safety~|~F49DA14FD59EDCF00DBB35D3E4BFE353801F4AB4 100125~|~1~|~1~|~01/IMS~|~Inspection~|~17 - Construction Engineering~|~058717882BE8C87F93AAFB4C4FC67DCAEB8679EB 98845~|~1~|~1~|~01/NHS~|~OTT-SR163 (south side) from SLM 24.16 to 25.06~|~28 - Facilities for Pedestrians & Bicycles~|~1205A09DBE7803960FAD2C962EC13713A23E34CD 114256~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges~|~17 - Construction Engineering~|~A1AB3487975613EDCDC1A5D7234FB9095A756AC5 116081~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~99F95FB0F7E968EEC2CC4F0AB90D7E7A3E5350C9 116081~|~1~|~2~|~02/NFA~|~Crack sealing of various ODOT facility parking lots.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7C003FBC4A3A77ACC755CC06D2A70FB2DEB1F4F8 111133~|~1~|~1~|~01/SAF~|~Constructing roundabout at the intersection of ATB SR 307 and SR 534.~|~21 - Safety~|~A7F7B1629739719BFA8F3240D82A6D9D9E59329A 111133~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8B72ECC1996D06905E983FF47F756B44ADA381A8 111133~|~1~|~3~|~03/S5K~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~4BDC88279306787766075A51F4AD17FF62904F2E 121386~|~1~|~1~|~01/SAF~|~Plan split for RPMs~|~21 - Safety~|~02A352DE087F2FBC9E149ABF2F9F5874BE0B8303 111436~|~1~|~3~|~03/SAF~|~Signal replacement on WAS 26 (Acme Street) and Phillips Street. Safety funded 90% Federal 4HJ7/10% State 4BC7.~|~21 - Safety~|~1F153B1A99499F74C18241EBB8162DD5CEFBB847 111436~|~1~|~1~|~01/S5K~|~Minor rehab on WAS 26 0.16-0.63. Acme Street in the City of Marietta. 100% Local funds.~|~05 - 4R Maintenance - Resurfacing~|~FD1839D6B131F4A9BEC34DFA87507F27CC798193 111436~|~1~|~2~|~02/S5K~|~Work includes base repairs as part of the urban paving portion of the project~|~05 - 4R Maintenance - Resurfacing~|~A20192CD412EE21350097CF77EE5B0188B806608 111436~|~1~|~4~|~04/S5K~|~Minor rehab on WAS 26 0.16-0.63. Acme Street in the City of Marietta. ODOT portion is 80% Federal and 20% State funded.~|~05 - 4R Maintenance - Resurfacing~|~FA31CDA8F200C036EEF723B04675EC8C2B6D5C10 113945~|~1~|~1~|~01/BRF~|~Replacement of structure > 20' span.~|~10 - Bridge Replacement~|~9B4EB8066BA30CC26E5D5819A8E7A48477840ECC 93617~|~1~|~1~|~01/S<2~|~Work inside the Lima Urbanized Area but outside the City of Lima. On SR 117 from the beginning of the project at 19.14 to the Lima Urbanized Boundary at 21.32. State and federal funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~530F2E05F11471EDD2A8FC3496649D84597DFBAA 93617~|~1~|~2~|~02/STR~|~Work outside the Lima Urbanized Area. On SR 117 from the Lima Urbanized Boundary at 21.32 to the end of the project at 28.61. State and federal funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~C0FCA1DC5D8F9CDCCE3B29E1930B2C5B00DBC0A1 86249~|~1~|~1~|~01/S>2~|~80/20 fed/local funding split for all work using NOACA STP funds.~|~13 - Bridge Rehabilitation~|~16F09885A0A30E73FC8DD0A60B8886339D7ED5B0 81728~|~1~|~1~|~01/NHS~|~priority system minor rehab. of COL-11-10.82 to 16.01; resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~F7EF6F16C2019CF4DB525CE40F2942146FD1C424 124483~|~1~|~1~|~01/NHS~|~Install sidewalks and ADA curb ramps~|~21 - Safety~|~0B2771B855CACD4DD1552CFBE1FB44F02A300230 77146~|~1~|~1~|~01/NHS~|~Work on the NHS system other than the work on the bridges. All funds from the District Preservation Program 80% 4PF7 and 20% 4PS7. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~8EF0F4F328112125FB69B2717F750F4EBE8E44CE 77146~|~1~|~2~|~02/NHS~|~For work on all bridges in the project. All funds from the District Preservation Program budget. There are no local funds in this split.~|~13 - Bridge Rehabilitation~|~B0E54382CF2E53B5E21AA0B7A6515BEF543EBFE7 111312~|~1~|~1~|~01/STR~|~District 5 Geological Site Management Funding - 4SF7 (80% Federal / 4SS7 (20% State) - See CAP Comment - River bank stabilization along Kokosing River adjacent to SR 229.~|~37 - Mitigation of Water Pollution Due to Highway Runoff~|~08FBA0D6A15B18253FCDFEF542C040CF3774E645 94204~|~1~|~2~|~02/NHS~|~Plan split for all NHS locations~|~21 - Safety~|~DC1094DC564562F7F68E025A93BAE1CB26DDE0D0 94204~|~1~|~1~|~01/IMS~|~Plan split for all Interstate locations~|~21 - Safety~|~FCECCC9081DA1E08970B504466E9A3873834F262 94204~|~1~|~3~|~03/S>2~|~Plan Split for all Large Urban locations~|~21 - Safety~|~56AD599F8E16BC1BB9C96E64310A763BBF440817 94204~|~1~|~4~|~04/S<2~|~Plan Split for all Small Urban Locations~|~21 - Safety~|~10262381F59BDE9B9B742CA64D3D018806A79CE0 94204~|~1~|~5~|~05/STR~|~Plan split for all Rural Locations~|~21 - Safety~|~B712FE2430BB1F73E196060842587E21542BD3C7 94204~|~1~|~6~|~06/SAF~|~Installation of flashing beacon.~|~~|~097EC51E384E9A27E7341AEAF36D80F049063F5F 107967~|~1~|~1~|~01/IMS~|~plan split for the longitudinal joint repairs~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6FA61523FDA79D972488654C1C24A1C0A68E5C2F 113360~|~1~|~1~|~01/S>2~|~Increase capacity and complete 5-lane curbed section on Social Row Road from Waterbury Ridge Lane to 300? east of Paragon Road. Phase 1 is the initial phase of a two-phase project to widen Social Row Road to five lanes from the existing 5-lane section at Waterbury Ridge Lane through the intersection of Paragon Road. The second phase will improve Social Row Road from Paragon Road to Sheehan Road.~|~~|~5054491A91E7C199AE097091FB0E9BFC79E578CC 123768~|~1~|~1~|~01/BRO~|~Bridge Painting~|~47 - Bridge Preventive Maintenance~|~6FB5CFDA27CD48A98A9BA9EE531E0B28E44DAE07 126077~|~1~|~1~|~01/NFA~|~Replace superstructure on bridge carrying SR 258 over Fallen Timber Creek.~|~03 - Reconstruction - Added Capacity~|~FA63F1362A1321C696CE2B4D528A26D2852FC9BE 101276~|~1~|~1~|~01/STR~|~Resurfacing STP Rural eligible portion.~|~05 - 4R Maintenance - Resurfacing~|~069A24C5742D8778DE074B4EBE1B09AE3615E9AF 101276~|~1~|~2~|~02/NFA~|~Resurfacing non-federal aid eligible portion (SAN-635-0.00-6.43) portion of project.~|~~|~4FA9E8C1FDA5077DF145A01BFDDB4FBF4AE9E6F9 101106~|~1~|~1~|~01/SAE~|~Eligible work to improve the crosswalks to the Willowick Middle School and improvement to the bicycle parking.~|~21 - Safety~|~D4A3A8D31EA4EE8DDB5AE4E7495CB86A088FBE22 93992~|~1~|~1~|~01/BRF~|~Replacement of SFN4733886 on CR 42 (Bursley Road)~|~10 - Bridge Replacement~|~16F7F58F1D340CC90A01CEE6517D8F564F690271 93992~|~1~|~2~|~02/BRF~|~Bridge replacement, 80/20 Fed/Local, with no Credit Bridge.~|~~|~9F34FC5A73035130D11D4984000B71804A478C45 93992~|~1~|~3~|~03/BRO~|~Bridge Replacement on Bursley Road (CR 42).~|~15 - Preliminary Engineering~|~F0758BBD2FF23519954EEDBD3CB5E55ED7991B48 98664~|~1~|~1~|~01/SAF~|~Place centerline, edge line and other pavement markings on various routes in Mercer County.~|~21 - Safety~|~DDC1EE928C6040C850893D5D5B4C2BD939CC8D95 96236~|~1~|~1~|~01/STR~|~STP Rural. SLM 0.00-7.96~|~05 - 4R Maintenance - Resurfacing~|~1E2976A44D7F9B56D15B0E82D3FA3EB1983A4A1F 96236~|~1~|~2~|~02/STR~|~STP Rural bridge replacement Non BR eligible MAD-40-5.92 over Roberts Ditch~|~10 - Bridge Replacement~|~73003DF71461D1079114B55CA3CD58FAAA2F4336 122035~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~EAEBC0804C765F227B3911F6AF660C679A0A554D 111027~|~1~|~1~|~01/SAF~|~Repair from landslide.~|~21 - Safety~|~7FD16954A25331478A014FED34E7B314ED1C7721 88504~|~1~|~1~|~01/NHS~|~Resurface US-23 from SLM 11.84 to SLM 17.62~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0483A195DCC19C40532A7EBD4CBCC4062D0EEE6C 88504~|~1~|~2~|~02/SAF~|~SEN-23 from SLM 12.26 to SLM 12.50~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0744CF4E484DB635167EE633B507EE6BD6475DFD 91716~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repairs. GAL 141 0.00-7.70, GAL 160 3.70-14.68. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~3E51212E11A897E9C4B3BBA84186AB803714C236 91716~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 141 21.44-22.03, GAL 160 3.06-3.70, GAL 588 10.83-11.71. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C5B5AC187E4A8A72A51F004C68576AC87B5DDB4E 116619~|~1~|~1~|~01/NHS~|~All work~|~05 - 4R Maintenance - Resurfacing~|~91E6012A8B6047A88A6D46F1D2D12DA3F11C6383 90972~|~1~|~1~|~01/CMQ~|~Plan Split for STA SR 93 Signals at Cherry and Locust Streets~|~04 - Reconstruction - No Added Capacity~|~DD7830A21699BEB56C1C183D6F13D80A44987CE3 85299~|~1~|~2~|~02/ENH/CANT~|~Construction of sidewalks, bike lanes, landscaping, in the City of Canton, Stark County, Ohio.~|~21 - Safety~|~39BC8F25907E6DE031B1B5C7669202BD099CCB5E 85299~|~1~|~1~|~01/NHS/CANT~|~Widening of 12th Street from Monument to Maple, including the widening of Market Street (SR-43) approaches for addition of left turn storage lanes, in the City of Canton, Stark County, Ohio.~|~21 - Safety~|~FFEFEA04786475A1469C5383663B43CD36CECA6F 91859~|~1~|~1~|~01/S>2~|~Plan Split for the Urban section of the pavement on on CLE SR 222 between SLM 19.41-21.44 and 23.89-25.0~|~05 - 4R Maintenance - Resurfacing~|~4493C4B3ACDAF2F39404984DDBE619907A1B8576 91859~|~1~|~2~|~02/STR~|~PLan split for the Rural portion of the pavement on on CLE SR 222 between SLM 21.44-23.89~|~05 - 4R Maintenance - Resurfacing~|~16CE630A5B550A1C7F1F6D9BF2782B0E8500CECC 115998~|~1~|~1~|~01/IMS~|~Plan split for slope repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E51A01F9E3F452B2D53F4F161A8DD3223D4422D5 111323~|~1~|~1~|~01/NFP~|~Reconstruct S. Industrial Parkway.~|~04 - Reconstruction - No Added Capacity~|~533B0015A150847EB3233CA02CDDFEF67EECFC8D 111323~|~1~|~2~|~02/NFA~|~Created for J&C Involvement.~|~44 - Other~|~B2FE9CE8B195031175F9E6D603B8C4C560B44DF3 111323~|~1~|~3~|~03/NFP~|~Created for J&C involvement.~|~~|~DE16EE0DCDAC63B0C9599C12E88DF29D6A747A5C 104007~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 50 22.78, SFN 8200572. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~8F49C2690224E708144CF3C0958D4C35F9B56C9C 92269~|~1~|~1~|~01/MPO~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4ED912F3235B07687A893F2B2E8B412FD8B721AB 127052~|~1~|~1~|~01/CMQ/MILL~|~Crossing enhacements.~|~28 - Facilities for Pedestrians & Bicycles~|~07DFA775E89C6588A632842BC2BB17733EFFD34A 106447~|~1~|~1~|~01/NFA~|~The City of Marion will revitalize and expand Cheney Ave going north from Barks Road W to Evans Road. A total distance of approximately 1500 feet.~|~01 - New Construction~|~6D62CE58B1A2DA8E0450B88E0A353980922B89E6 111258~|~1~|~1~|~01/NFP~|~Geneva State Park and Mosquito State Park resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~11EDFCDF6BCB26B05B6D8D4C8F12AEB13401E787 99509~|~1~|~1~|~01/NHS~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7~|~04 - Reconstruction - No Added Capacity~|~A55F2E73A38322297BE5A24AB1184E7C7CC97BBF 99509~|~1~|~2~|~02/NHS~|~4PS7 Funds to cover any funds over the Cap of $489,164.00~|~~|~2FF315CD850389FA04FD3963E64FC3B8554250C5 86853~|~1~|~1~|~01/SAF~|~Safe Routes to School funding to construct sidewalk on Rich St from Central Ave to Yale Ave~|~28 - Facilities for Pedestrians & Bicycles~|~980FF82DF0F766F251A12492C42655539ABE231D 98469~|~1~|~1~|~01/S<2~|~For work inside the Ottawa Glandorf Urban Area. US 224 from the CSX RR to the east urban boundary at 23.16. Please note that the log pont of the urban boundary need to be reviewed and updated as necessary when we get the information on new boundary location.~|~05 - 4R Maintenance - Resurfacing~|~7CAA66D0129DA7AE02DFE37103D574B8355A989F 98469~|~1~|~2~|~02/STR~|~For work outside the Ottawa Glandorf Urban Area including all work in the Village of Bluffton.~|~05 - 4R Maintenance - Resurfacing~|~40EFE8F1A323B748E831EBF311DEAF55351E5446 98469~|~1~|~3~|~03/SAF~|~Center line rumble stripes on SR 31 in Hardin County from 0.00 to 1.904 and 2.796 to 9.539 and on SR 65 in Putnam County from 1.84 to 6.554. Funding from the Safety Program.~|~21 - Safety~|~606AB2C35761559C8FAF52760519BC4737314AF0 108031~|~1~|~1~|~01/NFP~|~Reactive Maintenance on general and priority system pavements using partial depth pavement repairs~|~05 - 4R Maintenance - Resurfacing~|~2A65E4050F298AC2C88B7A001568879029020535 77317~|~1~|~1~|~01/IMS~|~District Allocation~|~21 - Safety~|~71E9ED531643F552B0DFB27211FF262027E0A123 123429~|~1~|~1~|~01/NFP~|~Created for J& C Involvement. ~|~44 - Other~|~2F56271C47BFD7C7414ACCCED54707DD176701CA 103413~|~1~|~1~|~01/STR~|~Landslide repair. NOB 145 9.87. Work length approximately 150 ft. DSR NOB-003.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4F9531DE7A372C9EB3EBAC86EBA0C183AA0EF2E 103413~|~1~|~2~|~02/STR~|~Landslide repair. NOB 145 10.03, DSR NOB-004. Funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2A1C5AEF151D6D10D9FEED62A6F294789C05DAD 95818~|~1~|~2~|~02/NFP~|~non eligible urban paving items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~198686DC1BD363F8A5D0D6C3847D7262E9B591A3 95818~|~1~|~1~|~01/NHS~|~Urban Paving Eligible items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B48708D0FFEF5D1DB67A0F083540E0D127332020 120987~|~1~|~1~|~01/IMS~|~All work is within this split~|~05 - 4R Maintenance - Resurfacing~|~0D7E80292A381D05D6738639B7803C5675DA53E1 88303~|~1~|~2~|~02/STR~|~Widen, rehabilitate and/or resurface approximately 10 miles of county roads. Federal Aid Rural, 80% Federal/20% Local. GAL CR 10 0.00-3.09, CR 20 2.84-2.93, CR 35 0.00-1.75 and CR 50 6.36-10.38.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7DF7FCDCFC2B2658FC3A0B7A96F49F3AC6A9EA33 88303~|~1~|~1~|~01/NFA~|~Widen, rehabilitate and/or resurface approximately 10 miles of county roads. Not on Fed Aid system (Local), 100% Local. GAL CR 20 0.00-2.84 and 2.93-10.82.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~87C4E915294E345757E04C1C127188DE0E6F8A3D 88303~|~1~|~3~|~03/S<2~|~Widen, rehabilitate and/or resurface approximately 10 miles of county roads. Federal Aid Urban, 80% Federal/20% Local. GAL CR 8 0.00-0.83 and CR 35 1.75-4.23.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E1204B442D409F427BCE5782266F160BA34D3C7B 92833~|~1~|~1~|~01/S<2~|~HEN SR110 0.66-0.85 relocation due to slide~|~04 - Reconstruction - No Added Capacity~|~106D93683AC37313B529354F2500CCE26FF61DE3 92798~|~1~|~1~|~01/S>2/Warr~|~Resurfacing of State Route 169 from US-422 to Corporation Limit, in the City of Warren, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~1E2FEE2DD6B3C95651BF46E5AB94AD7283AC5B23 92798~|~1~|~2~|~02/S>2/Warr~|~Guardrail work requested by the City of Warren, Trumbull County, Ohio. 100% Local cost.~|~~|~5E70FF2A3508CAFCC1CA76CF292AA262383CD522 101532~|~1~|~1~|~01/NHS~|~DSR# BEL-025~|~17 - Construction Engineering~|~ECFCF9B64819E823C6F3D32677FE1876630698E3 97099~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 669 1656, SFN 5802288. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~1C2BA764E2A7811023574753D76235A534BA020A 107797~|~1~|~1~|~01/ENH~|~Construct pedestrian bridge over the Cuyahoga River.~|~28 - Facilities for Pedestrians & Bicycles~|~22D74B7DFF338FE85455EDA1DE4E7FFFAF01D4B7 110129~|~1~|~1~|~01/STR~|~PIC 159 from 0.00 to 8.56~|~05 - 4R Maintenance - Resurfacing~|~C89EDC8D973D2B1475BEF7C7F909AB4E5421911E 118931~|~1~|~1~|~01/NHS~|~conduits 1988785, 1988782, and 1989089 have been linked to CO CC NHS~|~04 - Reconstruction - No Added Capacity~|~8A2BACADD2581CBBD94011BC82FC3B5B6001DFCD 118931~|~1~|~2~|~02/STR~|~conduit 1834612 linked to CO CC rural funding event~|~04 - Reconstruction - No Added Capacity~|~D54C33EDD190A94C445F7655EDC48C4108BD9FA3 118850~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~3A41B4A75618079D1B6784AD802CFA0AED19E562 100932~|~1~|~1~|~01/S<2~|~This plan split is for the small urban routes.~|~05 - 4R Maintenance - Resurfacing~|~DD9714C34A0E12DEDD643B793295E6A5348F40BC 100932~|~1~|~2~|~02/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~C95FDDDC7870D1093CFD47E4695475817E81E363 112968~|~1~|~1~|~01/SAF~|~Install cable barrier in the median of SR 161 from Hamilton Rd to Babbitt Rd~|~21 - Safety~|~C4541D3863FADE84ACA6D0DDAA19731E2F8893E4 126081~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~E628837F2CD22BF083350E12CABFFC4F1A27141D 91917~|~1~|~1~|~01/NFP~|~100% 4CP7/Maint. Funds for 1 year Fast Dry Pavement Marking~|~21 - Safety~|~2432E9C76B341FA04537597FA7E082001D9D6FD1 92686~|~1~|~1~|~01/NFP~|~This project uses 100% state funds SAC 4PS7 - No cap - Milling and resurfacing on SR235.~|~05 - 4R Maintenance - Resurfacing~|~F8FD87711A38990499E553E5F9B1537B4705645F 96301~|~1~|~1~|~01/STR~|~D09 GR 2018~|~21 - Safety~|~B7CF6D39E544D4E3A2ACB7FBFD537856A32C793E 96301~|~1~|~2~|~02/SAE~|~100% safety funds for guardrail.~|~21 - Safety~|~6F4D77EB3290F9FEC0FE0339063CE8C98F85F70C 123911~|~1~|~1~|~01/MPO~|~Construction of sidewalk on the west side of Stedman Lane from Dayton-Xenia Road to Summerfield Park.~|~28 - Facilities for Pedestrians & Bicycles~|~FACE4434911B5E87DDB7CF371BF2232FC50D9F86 108940~|~1~|~1~|~01/CMQ~|~construction of a shared use path that is eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~87275E9304A723BD8594E0173E167B0E1521426D 75923~|~1~|~1~|~01/NHS~|~LAW CHesapeake Bypass Phase 2From the Interchange of SR7 and SR527 east to it's intersection with SR775. Project Description: Construct the East bound lanes of the proposed Chesapeake Bypass (SR7) from the interchange of SR7 and SR527 eastward to it's intersection with SR775. Project length is 5.2 miles. House Bill Id's: OH131, OH232, OH379 and TC0903 TRAC01/NHS/PV/State~|~01 - New Construction~|~38E528525344698460BB2DF384B336D439524701 75923~|~1~|~2~|~02/NHS~|~Brdg Construction, 10 new Brdgs - LAW CHesapeake Bypass Phase 2From the Interchange of SR7 and SR527 east to it's intersection with SR775. 2.51 (B-1), 3.70 (B-16), 3.76 (B-2), 3.87 (B-17), 5.10 (B-4), 5.63 (B-5), 1.05 (B-14), 7.11 (B-13), 7.13 (B-6L) and 7.13 (B-6R)TRAC02/NHS/BR/State~|~08 - Bridge - New Construction~|~7817322F571868C5985C7F2D2DA3D0C9FC5C4CA7 107535~|~1~|~1~|~01/NHS~|~Concrete repairs on BEL-7~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CBFF881A6AE8DABFF7CDEF345A355F07063C86B7 93372~|~1~|~1~|~01/NHS~|~Priority system paving of DEL-23: 7.41-17.64~|~05 - 4R Maintenance - Resurfacing~|~B9A04952DBB231106EB45D8FCE5A7B88072D7BA6 112265~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~1C87EF8771BA6C77403122D89DB82EAA268A978E 100907~|~1~|~1~|~01/STR~|~Rehab or replace various culverts in Clermont and Warren Counties~|~04 - Reconstruction - No Added Capacity~|~EA742CE4B03DD168E4067EEDFFD352CB842A3FC1 100907~|~1~|~2~|~02/SAF~|~Widen the northbound US-42 shoulder in Warren County from Township Line Rd (SLM 15.69 to the culvert at 15.84 to be paid with Safety funds.~|~21 - Safety~|~B04B200D07A20D0D0A40B717A4F4F0790ED2286E 100907~|~2~|~3~|~03/STR~|~For slide repair, to install drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB9A72D725B89C492611B6222625CEA94DF8B4FD 110343~|~1~|~1~|~01/STR~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~0B373D1DCCC130B6F212EDBF9378541C583C9A43 103631~|~1~|~1~|~01/MPO~|~80% federal with 20% TRC for work to improve the pedestrian and transit users access that is eligible for MPO funds.~|~21 - Safety~|~F3E867201A3DAA6BE90BA9F350F3719BDB564D5F 122212~|~1~|~1~|~01/NFA~|~NEVI Round 2B-IR80-A~|~~|~4B750C9221187C9EF2D3EFDB3A29B2F9C3B6AC5B 88704~|~1~|~1~|~01/NFP~|~District Wide Bridge Maintenance Contract - bridges to be determined later.~|~13 - Bridge Rehabilitation~|~6631829F59763A4A263FBDCAC4D2CC107371E7B7 123609~|~1~|~1~|~01/IMS~|~Funding split for Interstate. ~|~05 - 4R Maintenance - Resurfacing~|~5030B74EA59697999AF79BC27FE49B8EB024CB7F 117535~|~1~|~1~|~01/BRF~|~CEAO funding eligible work for the replacement of the bridge.~|~10 - Bridge Replacement~|~EF950867E3FAAF024E05F98FCA8DD04841910B58 117535~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work.~|~17 - Construction Engineering~|~E7008C9D8025B54E39E54EC004FDCDCAE8BC891E 105459~|~1~|~1~|~01/STR~|~Plan Split for rural 735~|~10 - Bridge Replacement~|~60E59E4D07863BEDFBB2AE6BCB290DF8703E3A28 124005~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~B1568803E759053D6958245E267E7197A8A8C8D8 96993~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~21C89B6A2937C0C7C83B1BB7E2611FAC1140E3A4 127107~|~1~|~1~|~01/S5K~|~All work associated with the reconstruction of the roadway. ~|~04 - Reconstruction - No Added Capacity~|~88F05AA718F22EE2542DBC7A6B3CFE54D6F533E3 95126~|~1~|~2~|~02/NFA~|~SFN 54000481 MER 33 1250. Rebuild left deck edge using anodes.~|~13 - Bridge Rehabilitation~|~0F9057D0D41AEE966B87B1377D661AB18D16D712 104769~|~1~|~1~|~01/NFP~|~2 year lighting contract for POR, STA and SUM Counties.~|~21 - Safety~|~23A6C3AC8A776BA16F84C6786A01B0F6AC8EBC33 99805~|~1~|~1~|~01/NFP~|~Vehicle Purchse Trumbull County~|~44 - Other~|~ECE9E2D629E8A3E1BCF111FDDE54F416B99C56FE 125241~|~1~|~1~|~01/MPO~|~created funding event CO Contr 02 for uncapped funding source~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~80B37952369D5669663275E91A15EA8C12633EAD 115658~|~1~|~1~|~01/STR~|~Pavement resurfacing and markings utilizing CSTP (4B77) funds at 80% - Rural area. ~|~05 - 4R Maintenance - Resurfacing~|~8ABC52C70EDDF858DC50EE16FA71200BE7713A84 115658~|~1~|~2~|~02/S<2~|~Pavement resurfacing and markings utilizing CSTP (4B77) funds at 80% - Urbanized area. ~|~05 - 4R Maintenance - Resurfacing~|~C16096D2DCA2E179DF7B28678B607C08FFDE37B1 108874~|~1~|~1~|~01/NHS~|~Urban Paving mill and fill on USR 68 5.36 to 6.57 USR 68 6.70 to 6.93~|~05 - 4R Maintenance - Resurfacing~|~639A247B1521EE9D2344DEEA00414BEE4D4D58CF 108108~|~1~|~1~|~01/NFA~|~The County will widen and reconstruct parts of Front Street from Malta Village, north to 3rd St, widen the turning radius from Front onto 3rd.~|~01 - New Construction~|~346ACCE18F8ECDE576F9C69E25686CEAC6B9AB07 89077~|~1~|~1~|~01/IMS~|~Ohio's Share of Construction.~|~~|~90552FCC5F871E93D2BF1F434A0CC18934084466 89077~|~1~|~2~|~02/IMS~|~This plan split covers bridges that are being rehabbed. ~|~~|~386302B5749D999B5B033CD5B16DD23C2794147C 91013~|~1~|~1~|~01/BRF~|~SFN 7841485 Nelson Moser Rd CR122 over mahoning river~|~10 - Bridge Replacement~|~B1B00384087356416EE40FD0A3B40CEF60C50BE4 107323~|~1~|~1~|~01/NFP~|~Split for mowing work~|~44 - Other~|~1AC3F76118F8C62873B1C35CA4120A38D041D5E6 98464~|~1~|~1~|~01/STR~|~Rebuilding and repairing of guardrail as directed throughout District 11.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D2FDD6F026F81BFDD93248737EBDA7C0698C0E58 98464~|~1~|~2~|~02/SAF~|~This plan split for CO CO 03 is for the replacement of the type A anchor assemblies on the NHS system in District 11.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EC708A7584565D0F18E45737E630A30D9BD9BD95 112746~|~1~|~1~|~01/MPO~|~Resurfacing project in the City of Wooster - Large City Funds~|~05 - 4R Maintenance - Resurfacing~|~868BA211A457A224CBC5A2C6753DE70AE931883D 119242~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~DBE657A5407422BFAD04F9634A240DC9B342372F 114090~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~7579FA25A07B262FAD335B021A58A35DC4E84925 112924~|~1~|~1~|~01/STR~|~UNI-37 from 6.90 to 9.14. UNI-47 from 13.55 to 14.14 and 14.21 to 15.00.~|~05 - 4R Maintenance - Resurfacing~|~4F2B6F6E0038A52587A9AB6264723875196DDB00 115953~|~1~|~1~|~01/MPO~|~Lagrange resurfacing from Greenbelt Pkwy to Summit Street~|~05 - 4R Maintenance - Resurfacing~|~EC51716A649A5D485B772E23FA33A5852AAFDB30 121796~|~1~|~1~|~01/SAF~|~PM on various CR.~|~21 - Safety~|~F6458FD37A575457C725B67D0A99BB4A9A301A6A 88997~|~1~|~1~|~01/BRF~|~Bridge replacement of SFN1766503 muni bridge over Paramour Creek~|~10 - Bridge Replacement~|~0C3902EDAA4F34313CD443B291E9B9E87A929FEA 88997~|~3~|~3~|~03/S<2~|~For 100% Local Items~|~17 - Construction Engineering~|~689B065736FF859EE4ACF12072FE69824E846CCA 88997~|~2~|~2~|~02/S<2~|~Road work associated with the bridge replacement~|~10 - Bridge Replacement~|~79B8EA7790E23DAFC7551369BE8A90B080444889 97839~|~1~|~2~|~02/BRO~|~OBPP - Replacement of SFN 0731250.~|~10 - Bridge Replacement~|~43C065EF0F9EF193A9108D8DB5C558D3AD5A0996 97839~|~1~|~1~|~01/BRO~|~OBPP - Replacement of SFN 0731269.~|~10 - Bridge Replacement~|~A2F3D73834E2B1898D110B49224F52CB0159B3A9 112286~|~1~|~1~|~01/BRF~|~Bridge replacement on PIK-CR77-2.07 (SFN 6631312)This is a Ohio Bridge Partnership Program project.~|~10 - Bridge Replacement~|~908A600B7DFF06403821317EB76D308290C6F89B 77269~|~1~|~3~|~03/IMS~|~Construction of noise walls, within the City of Akron, Summit County, Ohio.~|~44 - Other~|~22377A9B44FF69ABF58C2CDC265411FA74D8EBE7 77269~|~1~|~4~|~04/IMS/Akrn~|~100% City of Akron items.~|~44 - Other~|~331AB2108A7CACD0BAC007363E2C47FDED915025 77269~|~1~|~5~|~05/IMS/AT&T~|~100% AT&T items.~|~44 - Other~|~58B8EEED9D2E8FF2F4E0797C7C3E9A536DF38D2A 77269~|~1~|~1~|~01/IMS~|~Reconstruct IR-76/77, and change the access points and geometry of the Main/Broadway and Wolf Ledges/Grant Interchanges, in the City of Akron, Summit County, Ohio. ~|~04 - Reconstruction - No Added Capacity~|~D423347F963D89BA88A1BE07EB194913BBD6CACC 77269~|~1~|~2~|~02/IMS~|~Replacement of eight structures in the City of Akron, Summit County, Ohio. SFN#7703309, SUM-76-10.34. SFN# 7703333, SUM-76-10.37. SFN# 7703244, SUM-76-10.41. SFN# 7703155, SUM-76-10.43. SFN# 7703279, SUM-76-10.44. SFN# 7760167, SUM CR006460-1.05. SFN# 7703120, SUM CR00648-0.04. SFN# 7703090, SUM CR00649-1.09.~|~10 - Bridge Replacement~|~F5469E2F610893AC7C71A53E13967CEC1550A4C4 77269~|~1~|~6~|~06/IMS~|~Ongoing Engineering split.~|~17 - Construction Engineering~|~A798A17AC4C11EA361DC55C97C7055E706ADC45E 77269~|~1~|~7~|~07/IMS~|~Maintenance of Traffic adjustments on the Akron Beltway system, including striping, portable barrier, etc.~|~44 - Other~|~B46B3C2683877AA1D454422C56F45FBCE7523B29 77269~|~1~|~8~|~08/IMS~|~Heat straightening and beam splicing after mid-December collision with flatbed truck carrying a bulldozer.~|~04 - Reconstruction - No Added Capacity~|~CEF061EA99A32B4C6B887B9FBD829E3E021275A3 126243~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~66B192D0C846ACB6565E5EC5A299B1D73F64FB2E 100443~|~1~|~1~|~01/NHS~|~Deck SealingJAC 32 5.60 4001656JAC 32 5.60 4001680JAC 32 2.98 4001710JAC 32 2.98 4001745JAC 32 4.78 4001834JAC 32 4.78 4001869JAC 32 11.13 4001893JAC 32 11.13 4001923JAC 32 11.29 4001958JAC 32 11.29 4001982JAC 32 11.75 4002040JAC 32 11.75 4002075JAC 32 12.55 4002164JAC 32 12.55 4002199JAC 32 17.12 4002245JAC 32 17.12 4002253~|~13 - Bridge Rehabilitation~|~D71EABEA10247BFCE2E8F753777E5F260214527F 114510~|~1~|~1~|~01/STR~|~Resurfacing portions of CLI-124 + CLI-134 in the project~|~05 - 4R Maintenance - Resurfacing~|~327860B8C26E2A2F9A6FD2BA8283D43131DB0C56 102881~|~1~|~1~|~01/S<2~|~Resurfacing of BEL-40 including microsurfacing and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~CEE76097183FD8EE7E488AC644A6F5C778D7AFE7 119259~|~1~|~1~|~01/S5K~|~Mowing.~|~44 - Other~|~F87BC497D8CF623A445647194EF251BF6113C0EF 125874~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~84C650DBF346F0F8E8B234AB1163D2446B262955 125874~|~1~|~2~|~02/NHS~|~Bridge Maintenance~|~47 - Bridge Preventive Maintenance~|~FE58B0E02757CA657846B1B967BD983BD00CF901 110995~|~1~|~1~|~01/SAF~|~Construct shared use part as part of GMRT~|~21 - Safety~|~92A6C8A4164F9666EB9336636BDD44E166222F43 103056~|~1~|~1~|~01/IMS~|~Split covers rehab work on twin bridges SLM 48.02/48.03~|~13 - Bridge Rehabilitation~|~A64501B631573DCBCC3C9E89281CA4ADCF26668D 98837~|~1~|~1~|~01/NFP~|~Added split for signal work~|~44 - Other~|~72104F3EB21A3A3CFFA5C5EB67BD5DA4D15A2E39 109059~|~1~|~1~|~01/STR~|~LOR SR 082 06.43/MED SR 0003 22.16~|~21 - Safety~|~C0E1B55A35CDDA1DFB5143937BC12B5B3B671605 109059~|~1~|~2~|~02/NHS~|~LOR SR 0058 22.63/ MED SR 0018 07.78.~|~21 - Safety~|~4A34A1EA5265EC858FC46858554B8F4B968C8F01 84318~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a double microsurfacing treatment. VIN 93 7.47-10.25. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~C3025B5FC4C160965AF86B01DB4ED96CF5688814 123397~|~1~|~1~|~01/STR~|~Rural~|~44 - Other~|~0D63D15408E1B81FAF2BEF8F512C97971CEDBB51 93124~|~1~|~1~|~01/NHS~|~"01/NHS/OT " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Guardrail Upgrade on 1) Cos-US 36-19.10 to 19.41; 2) Cos-SR 16-00.54 to 10.05;~|~21 - Safety~|~4A3544F7FF1086D862E78FA7A18CFD3017060EEC 121418~|~1~|~1~|~01/NHS~|~Plan split for NHS portion of WIL-20~|~05 - 4R Maintenance - Resurfacing~|~7D220E14B1A7A832E76801AD0EF1B013C4339F68 121418~|~1~|~2~|~02/STR~|~Plan split for non-NHS portion of WIL-20~|~05 - 4R Maintenance - Resurfacing~|~C54886D83AF0DA4936C21020DA53757A1C295250 125150~|~1~|~1~|~01/STR~|~MER 49 rural pavement repair~|~05 - 4R Maintenance - Resurfacing~|~D44DCA5F6E8944E870E2F61FE1C8BD5F38315FB1 125150~|~1~|~2~|~02/NFP~|~LOG 559 pavement repairs~|~05 - 4R Maintenance - Resurfacing~|~F553722790C2396E740C1D5F04531A232BEC32E8 112470~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 684 0.19, CFN 1819550. Rural federal aid funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~336F9CC121BE0EA913B3AD191869060861459E56 110710~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A113EB9D1FAEC389E2B38294D0FEC6510454215F 110710~|~1~|~2~|~02/NHS~|~Minor bridge rehabilitation > 20' span.~|~13 - Bridge Rehabilitation~|~445580700F7E84BB35285C26F00646745C3EDA62 110710~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~9BE8974CA5847EABD0570C5922058B844E9D0D2A 110566~|~1~|~1~|~01/STR~|~Rehabilitate bridge over Dry Run replace superstructure, pier caps, abutment caps, and encase piling~|~13 - Bridge Rehabilitation~|~0D1E7CDCAD8630E981283040527DBE533A019CC0 111632~|~1~|~1~|~01/NFP~|~Crack sealing of various routes throughout the district.~|~99 - State Preventative Maintenance~|~D49DE18287377B1364EA5A3EA9DE6EA68AED1A3E 99649~|~1~|~1~|~01/S>2~|~Timber debris removal for bridge BUT-122-0606 (SFN 0902209).~|~44 - Other~|~0455EED74CCD2680A5C57A58C37ECD7AE7E7354D 105207~|~1~|~1~|~01/STR~|~Resurfacing of ATB SR 534 from 0.00 to 3.39~|~~|~B228367D99D1BC743498369BAC0282FBA144C324 105207~|~1~|~2~|~02/STR~|~See linked structure > 20' span.~|~~|~09047AE33DD227587EE9DC0B5D7D03F55EEE59A5 105207~|~1~|~3~|~03/STR~|~See linked structure 10' to 20' span.~|~~|~478483C2B0E91A13AE6AAE0D6192519F5BEB59E6 109516~|~1~|~2~|~02/S>2~|~Plans split for Non NHS pavements - US 20~|~05 - 4R Maintenance - Resurfacing~|~CD049A256BE3C8F30753ED7ABC2CB046FA05AA38 109516~|~1~|~1~|~01/NHS~|~Plans split for NHS section - SR 25~|~05 - 4R Maintenance - Resurfacing~|~AC4F79E827192C5FABE6ECECBB3A8D3C21CE4DBF 109516~|~1~|~3~|~03/NFP~|~100% City of Perrysburg items - pavement repair and curb ramp items~|~05 - 4R Maintenance - Resurfacing~|~AE70EF20EA814888A5BCD880B5C7524FB8BDAD3E 119661~|~1~|~1~|~01/NFP~|~Plan split for construction engineering~|~17 - Construction Engineering~|~1225008B907CA9A2E736DA6B1EF38DED8D231507 105815~|~1~|~1~|~01/IMS~|~Added split 1 for work on the interstate system~|~47 - Bridge Preventive Maintenance~|~AF79E5B3586142E5F3F52DBED52F065BC39FADDF 94071~|~1~|~1~|~01/NFA~|~Construct a new 40 X 60 three sided storage shed at the Enon Outpost.~|~01 - New Construction~|~4856C9DE205427EF4C6ABA5132F28D6267C7B0E5 106106~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: UNI-4-13.61-14.06 UNI-31-0.00-1.51~|~05 - 4R Maintenance - Resurfacing~|~61793D6F30D58BC553574D3BEAB9D6C0F3F342E9 97863~|~1~|~1~|~01/MPO~|~Resurfacing Steels Corners Road from State Road to Wyndam Ridge Drive, in the City of Cuyahoga Falls.~|~05 - 4R Maintenance - Resurfacing~|~4A84BDC28254D05A3E499AF5F12F7AD6BDC32558 86481~|~1~|~2~|~02/S>2~|~All items of work for the new bridge being constructed under the railroad tracks.~|~08 - Bridge - New Construction~|~67EA535844ACDFB73BD00902222AFB536334A62E 86481~|~1~|~1~|~01/S>2~|~Multiple funding sources for pavement eligible work items:* 80/20 federal/local funding split - earmark (capped)* 80/20 federal/local funding split - MPO STP (capped)* 100% State TRAC funds* 100% Local - Cleveland (only if the City request and at their cost)~|~04 - Reconstruction - No Added Capacity~|~A565440C077843BC8AF997A4599B7AA50BA227B1 86481~|~1~|~3~|~03/ENH~|~80% fed / 20% local funding split using MPO Enhancement funds.~|~31 - Landscaping & Other Scenic Beautification~|~ED0B21FD88F818CADB7C32BE87DCB3DA99E95154 84659~|~1~|~4~|~04/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~728353DB165EAB2F2D41EF58BF7DD7504B3001B0 84659~|~1~|~2~|~02/NHS~|~Resurfacing STA SR 21 from 5.14 to 9.76~|~05 - 4R Maintenance - Resurfacing~|~B6FF2B5D6820119F93F842D0983D06EA061F1D49 84659~|~1~|~1~|~01/IMS~|~Resurfacing SUM IR 77 from 21.99 to 24.20.~|~05 - 4R Maintenance - Resurfacing~|~469928B2ADDE165E2C6FCA2CD4554899F2546676 84659~|~1~|~3~|~03/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~E37E608D81400D8603CAA5E4F61E6952A8AD0798 109688~|~1~|~1~|~01/S<2~|~Resurfacing SR 416~|~05 - 4R Maintenance - Resurfacing~|~1E306E31234ED9F8547E0811554FF1E6BC3EC757 109688~|~1~|~2~|~02/NFA~|~Resurfacing SR 751 from SLM 0.00 to SLM 4.04~|~05 - 4R Maintenance - Resurfacing~|~9050BBB4EC5F4AF7F2789488057198ABA1A73411 109688~|~1~|~3~|~03/STR~|~Resurfacing SR 751 from SLM 4.04 to 4.38~|~05 - 4R Maintenance - Resurfacing~|~D22F81DABC997412804146C59E3BA0CFFF2590EA 96931~|~1~|~1~|~01/IMS~|~Slide repair project. WAS-77-5.88. Interstate route funded 90 federal/10 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D96D07F33530389899AB62450DB442F9DC9B470A 122753~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~10050B86BD10F4C2F7F64C5CE671885871D2DCDA 117598~|~1~|~1~|~01/BRF~|~Bridge replacement. All work is included in this plan split. ~|~10 - Bridge Replacement~|~91E93A04604BBCC0189E211136D3A9D9161A681A 96900~|~1~|~1~|~01/NFA/ADA~|~Adams County Guardrail Project- CEAO - 100% Fed.~|~21 - Safety~|~919EE994A03AE753F0A5BAE596B254F0A77C442C 116820~|~1~|~1~|~01/IMS~|~Concrete pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~3E66EA511065A8B2701023F064E407385D421B78 116820~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~6AAF9F24E10A65821947EDBBF81BC30090CEE4D4 97760~|~1~|~1~|~01/NFP~|~Construct new Jeffersonville Outpost in Fayette County~|~44 - Other~|~B6B37B182FE7B0AC8223099EFB9A84F86863AE42 124385~|~1~|~1~|~01/NFA~|~Resurface multi use trail~|~28 - Facilities for Pedestrians & Bicycles~|~78A41AFA278435E6FD5AE39D73360500118BB4C3 112264~|~1~|~1~|~01/NHS~|~Consultant construction services for FY 26 & 27~|~17 - Construction Engineering~|~26CD9844B6ED4FAB2C2DC470FABDE5BB4A88599F 98605~|~1~|~2~|~02/NFA~|~Split for paving the Burton Facility~|~05 - 4R Maintenance - Resurfacing~|~CCFB92B159FFCB314CAF77324922446A28D85E3A 98605~|~1~|~1~|~01/NFP~|~Plan split for paving using system preservation~|~05 - 4R Maintenance - Resurfacing~|~115D646027C40BA34D9A755FC1808D00C5BFFAF0 110827~|~1~|~1~|~01/SAE~|~Safety fund split~|~21 - Safety~|~87A0D190796705300EA2BA9807B556510760E489 100933~|~1~|~1~|~01/STR~|~PLan Split for the pavement repairs on PRE-127 and PRE-726~|~05 - 4R Maintenance - Resurfacing~|~8424331A57BAEC5B9ADBC331610517EA59C71BF3 121092~|~1~|~1~|~01/S>2~|~STP >200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~A0CEE87B91AC6C5572BC17ABDE27AFCE194AB252 113301~|~1~|~1~|~01/MPO~|~work eligible for federal-aide~|~05 - 4R Maintenance - Resurfacing~|~F193BF7C0A7B353DB6457509C26BD38C13951EC0 92750~|~1~|~1~|~01/NFA~|~Bridge replacement project funded by CEAO. MRG CR 20 0.63, SFN 5830443. Work includes approach relocation. Federal 95% (15% credit bridge) and Local 5%.~|~10 - Bridge Replacement~|~475FD53CDFD68256689A97FC7D7F9600745BD01D 119115~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~50267FE1EB7E26895DCE75A14A2312BF2100F7AF 92117~|~1~|~1~|~01/STR~|~WOO-199~|~05 - 4R Maintenance - Resurfacing~|~8EEBFFEF4949A65B566F4A06F349C7FB35DBB3A6 97657~|~1~|~2~|~02/STR~|~Resurfacing COL-558 from SR 7 to SR 46 including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~81ED15B6EF1209AB2CE7A292BFA0943E9EB76F7B 97657~|~1~|~1~|~01/NFA~|~Resurfacing of COL-558 from SR 45 to SR 517 including asphalt overlay, pavement repairs and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~DA53B6A5DBF2DBE9B262FB432264A09FACB7DFB1 114217~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span.~|~~|~F5D74BCD6F831CF166EBB9485C2D3099CAE9E289 121255~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~8CE403EB7BBE8D44D854A8D3A640051812A50998 112859~|~1~|~1~|~01/STR~|~Overlay on SCI 73~|~05 - 4R Maintenance - Resurfacing~|~2860E9925F9FC1DD4225209013029AACCD60C298 83110~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation funding for resurfacing of Muskingum US 22 from the 00.00 to the 07.16 and SR 83 from the 25.98 to the 27.65. The ADA ramps in the Village of New Concord are the responsibility of the District. There are no funding CAP's.~|~05 - 4R Maintenance - Resurfacing~|~E6C57A2281F1FD49C87F7F81317F5CBE7764F086 83110~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - Geological Site Management Funding 4SF7 (80% Federal) / 4SS7 (20% State) - CAP = $150,000.00 per 11/17/2011 approval to transfer from PID 89374 - Slip repairs at Mus-US 22-06.42/06.61/06.80~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2819FA83978D96AEE862A800B79493063180834 92972~|~1~|~3~|~03/NFA~|~"03/NFA/OT/ " - District Preservation Marking Pavements 4PS7(100% State) - No CAP - Marking Pavements after resurfacing on Lic-SR 657-00.00 to 01.95~|~17 - Construction Engineering~|~A68B8DA457BEEB207D074E5A34E41287BA2C1A10 92972~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation Marking Pavement 4PS7 (100% State) - No CAP - Marking Pavements after resurfacing on 1) Lic-SR 657-01.95 to 14.91; 2) Kno-SR 657-00.00 to 04.93~|~17 - Construction Engineering~|~AAA7EA80D8CE674DDC9A1355E33DDF963876C0E7 92972~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on Lic-SR 657-00.00 to 01.95~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D7A769E963E54B183EE45D4F073E914A5451FA08 92972~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7 (100% State) - No CAP - Resurfacing on 1) Lic-SR 657-01.95 to 14.91; 2) Kno-SR 657-00.00 to 04.93~|~17 - Construction Engineering~|~EA7B1B48A307420A7B6BFCDADD58B94042C8A264 101135~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~0B2433D47F62DCEF457DC059712302E77C184589 101135~|~1~|~2~|~02/IMS~|~Friction improvements to the I-70/SR 235 Interchange; Ramps D, E, G, & H. Pavement will include a percentage of Ontario Trap Rock~|~05 - 4R Maintenance - Resurfacing~|~7510A4C03E460F31C84A4C6AC7E5C993D43601B5 119908~|~1~|~1~|~01/STR~|~Project to address flooding location by improving drainage and realigning vertical roadway profile at ATH 56 0.90-1.10. Funded 80% Federal Protect/20% State.~|~66 - Resilience Improvement - Highway Project ~|~F70F7864F1C21A4575722473FE89D6237CC7EDE5 101077~|~1~|~1~|~01/IMS~|~Concrete Pavement Repair on POR IR 76 0.00 to 1.57.~|~~|~58197C9A4C061587731704D331025E9C0265F7FE 105455~|~1~|~1~|~01/STR~|~WAY-83-16.31 to 25.43 (Includes Major 2 Funds)~|~05 - 4R Maintenance - Resurfacing~|~28BF376EB5E57D94E776EF17824C59F039205E5B 109860~|~1~|~1~|~01/NHS~|~Seal concrete bridge decks throughout District 11.~|~47 - Bridge Preventive Maintenance~|~4FCA7B880333592F01B15EA4807D9F17CA199544 97040~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FE039A45E320623BE4AB566939BD7D3F745AA864 98180~|~1~|~1~|~01/STR~|~STP Rural Bridge Replacement Non-BR MAR-231-1.04 over Owings Ditch~|~10 - Bridge Replacement~|~C45D53E80EBCB23BA56CD45BF3CB35276A5F8733 120125~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~0B7F55A2B3FDEDD94A68BE735428B8F5C2F6D947 106601~|~1~|~1~|~01/BRF/GCEO~|~"01/BRF/BR/GCEO" - Guernsey County Engineer project to replace bridge Gue-TR361-0.92 (SFN 3030539) using the Federal/State Exchange Program with state max of $978,400 funded at 80%~|~10 - Bridge Replacement~|~E768B3A52CDB829476FF378B74C78197426BCF89 101958~|~1~|~1~|~01/S<2~|~This plan split is for STP < 200000 MOT US 40 14.44 - 19.26~|~05 - 4R Maintenance - Resurfacing~|~687A1A424E07E6611C9F7DECED1790F2168B74C5 101958~|~1~|~2~|~02/NHS~|~This plan split is for NHS route MOT US 40 14.32-14.44~|~05 - 4R Maintenance - Resurfacing~|~4C64DA51BA1A8E225EBC804ADBA1F4D501226D62 108079~|~1~|~1~|~01/STR~|~General plan split. Splits will become more descriptive when locations are determined.~|~17 - Construction Engineering~|~6103A9AEBB3C7CF5CBD179115FDCFC97C820BA75 93744~|~1~|~1~|~01/STR~|~Pavement~|~01 - New Construction~|~D3C7F6E37FDF1DFBFE47E1CFBFF4EE22C217BCA1 93744~|~1~|~2~|~02/SAF~|~Roundabout at SR159 & SR180 Intersection.~|~21 - Safety~|~D06C81CE837D04AF5C3A7663C4D919D02845DEEA 117351~|~1~|~1~|~01/S5K~|~Bridge Rehab~|~13 - Bridge Rehabilitation~|~71C715ED5507E5003214052ADDD106C53E927845 107591~|~1~|~1~|~01/NHS~|~Upgrade the traffic signal hardware at TUS 250 21.73~|~21 - Safety~|~27A5F308F1DB6528FE6A029A371533697D3EA337 107591~|~1~|~2~|~02/S<2~|~This plan split is for the traffic signal upgrade at COL 62 2.86; COL 13.26; COL CR 447 3.39~|~21 - Safety~|~F8ABFDAFC3ABB586917F078BF47BE79ACDE709DE 107591~|~1~|~3~|~03/STR~|~This plan split is for the traffic signal hardware upgrade at HOL 39 28.25~|~21 - Safety~|~B29841445E31053AFE62C2F5F57DBC68138B18D3 123549~|~1~|~1~|~01/MPO~|~City of Grove City - Connect northern leg of Haughn Road to N Meadows Drive with an overpass over IR 71.~|~01 - New Construction~|~CD6DA990641A7CDBDD8BD970894F55B7E503D3C4 95402~|~1~|~1~|~01/BRF/PIK~|~It is proposed to rehab SFN 6631401, on CR85 (Tennyson Road (Old SR772)).80/20 Split CEAO project~|~13 - Bridge Rehabilitation~|~8EEE0ECC9B4A87A1E75DB0B89172B754FED01C64 91101~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~1E87C805C4335A815A9E5EBFAABFD8F108DB4114 91101~|~1~|~2~|~02/NHS~|~Bridge Maintenance Work~|~13 - Bridge Rehabilitation~|~007ADE6E5CCA6F1F9DCD2AD2877D0CED3BE1D922 91101~|~1~|~3~|~03/SAE~|~Rest area work.~|~05 - 4R Maintenance - Resurfacing~|~81D9303A6EBEE9268F2CB624EE5E696895328A9A 86755~|~1~|~1~|~01/SAF~|~Signals~|~21 - Safety~|~403DD5B734270B9CF6A53746619FDF8D5BEF91CF 123509~|~1~|~1~|~01/STR~|~Replacement of superstructure SFN 6402097 along SR 204 in Perry County.~|~10 - Bridge Replacement~|~588556F2ADBCD709A64FD207329F57DA5393AF5C 107833~|~1~|~1~|~01/STR~|~District Emergency Preservation Project - 4PS7 (100% State) until Federal Declaration Then switch to 4BY7 (100% Federal) - No CAP - Hill side slip above Gue-US 40-14.31~|~21 - Safety~|~8D155F0608F2EBAA734A52FD30ECEFC735BC9276 91032~|~1~|~1~|~01/MPO~|~Signals~|~~|~3676883737EDEC4AF5A5AA42CC6A93B8FCD7C961 115429~|~1~|~1~|~01/ENH~|~Shared Use Path construction along CR 23 utilizing Federal TAP Funds at 95%.~|~28 - Facilities for Pedestrians & Bicycles~|~9C1AADB6E86E9553013C62A6D0E46BCAD98FF0EE 94438~|~1~|~1~|~01/S<2~|~Bridge - Major Rehabilitation~|~13 - Bridge Rehabilitation~|~1E291C3A8CB65DC3EC8AF9D4AE0A9B715B232B59 94438~|~2~|~3~|~03/SAF~|~Plan Split for 100% City items, mostly water work items that aren't federally eligible items.~|~21 - Safety~|~242166E8BFCB559904503EEAF6BEB52475A3BC5F 94438~|~2~|~2~|~02/SAF~|~Plan Split for Roundabout ConstructionPriority 1 is for Luminaire, Conventional, Solid State (LED), As Per Plan (Alternate 2) ~|~21 - Safety~|~A8F1FBAF5D050066006959C4665FCE1953277FDD 118948~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8A76B83288237619C60196CC4905045362BDB9B9 118948~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~5B01D79CE092850E35C433A84FCDCB9E086D1C83 87214~|~1~|~1~|~01/STR~|~3604322 HIG SR753 16.64 Intersect: Opossum Run80 fed/20 state01/STR/BR/State~|~10 - Bridge Replacement~|~7DBA837E5121D2BB1DD56E77C63793A839197AFB 95149~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7/0005 (100% State) - No CAP - FY2017 Maintenance project for application of Spray Thermo pavement markings on the NOFAS-Rural Routes~|~21 - Safety~|~B816CAE2192757A15BDD89EB82D1D7C42AE05693 99871~|~1~|~2~|~02/CMQ~|~From SLM 18.94 to 19.23 - From Sta 30+25 to Copland Ave~|~21 - Safety~|~985E6DB15D603277CD3EBFDFE24B22B8E9D1E2E2 99871~|~1~|~1~|~01/MPO~|~LUC-US24 from 18.56 to 18.94 - AWT to Sta 30+25~|~21 - Safety~|~230B1BD2E0F2FBB192D13A75C4F7D43465F8AA8E 113429~|~1~|~1~|~01/SAE~|~Safety funded Plans split~|~21 - Safety~|~D61F40D43ADE424F964A6542A2BCE13B8A20F220 100763~|~1~|~2~|~02/NHS~|~Structures less than 20 feet span~|~04 - Reconstruction - No Added Capacity~|~A11140056765D583C650043930F76D4C5B7E0B45 100763~|~1~|~1~|~01/NHS~|~Deck overlay and/or railing repair on four structures~|~13 - Bridge Rehabilitation~|~51CE25B6CCD7B8B22AE3B87981CA82C81D92584C 95490~|~1~|~1~|~01/STR~|~01/STR/OT ; Plan split for 80% federal and 20% state funded culvert work using the culvert SACs 4CW7 and 4CV7.~|~44 - Other~|~09141F4EE643884D41203E15EA53696DC2719CA3 118123~|~1~|~1~|~01/MPO~|~MPO STBG and CRSSA funding~|~05 - 4R Maintenance - Resurfacing~|~E8992FE69AAE0E68FA889A501E61BDE46A471E8C 125468~|~1~|~1~|~01/SAF~|~Install rural roundabout~|~21 - Safety~|~2BA3B24390D213FF7F81B252AC4859928839965B 118949~|~1~|~1~|~01/SAF~|~Install mast arm mounted Rectangular Rapid Flashing Beacons and pedestrian refuge islands on the north legs of the Cleveland Avenue intersections with E Dunedin Road and Dunbar Drive-Piedmont Road. ~|~~|~36EFDBD82D8B6E2AE9EB0A90AD07BDFA8E401CBE 118865~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~38F76D8AF4978164C0A068EFA279E27085C82462 83533~|~1~|~1~|~01/BRF~|~BR eligible bridge replacement on McLean Mill Road over Big Darby, on new alignmentSFN 6533167, PIC TR127-2.36, Big Darby~|~10 - Bridge Replacement~|~4C5DE7277F32FB20D8F8B8CC75E1EFACD1AFF64D 102453~|~1~|~1~|~01/NHS~|~Increase the storage (decel length) on the north and southbound off ramps from State Route 8 to Howe Road to eliminate queuing from the ramp intersections.~|~21 - Safety~|~4479D566428531DEB212209CEE95C10262781AD3 106445~|~1~|~1~|~01/SAF~|~SR 91 improvements between Barlow Road and Veterans Way.~|~04 - Reconstruction - No Added Capacity~|~857A7808452014E1731EE173BA3DA8A99331FFD2 101382~|~1~|~1~|~01/NFP~|~Tree removal/pruning for District 8.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2953C099F140B845A11EF6DABE87CB9517C2B860 112958~|~1~|~2~|~02/S>2~|~DEL-36 from 22.17 to 22.84~|~05 - 4R Maintenance - Resurfacing~|~55D198C8A44ECD825BB778A1B65919BC561D65DA 112958~|~1~|~3~|~03/STR~|~DEL-36 from 22.84 to 25.51 and 26.43 to 28.61~|~05 - 4R Maintenance - Resurfacing~|~1234A0E18052DCC7763EB29FB611759941203BD6 112958~|~1~|~1~|~01/NHS~|~DEL-36 from 18.39-19.90 and 20.26-21.46~|~05 - 4R Maintenance - Resurfacing~|~0E2AF910DC6ED58EF7F7EF91CB24F5ACB7E93A30 98107~|~1~|~1~|~01/STR~|~Spot Paving various locations in District 11.~|~05 - 4R Maintenance - Resurfacing~|~DDFFBC3ECBAEE12D1B34665C3854CF5571AF4ACE 102330~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~47 - Bridge Preventive Maintenance~|~7FE9DC926ED90BD2D7F599B2A2EBCAB0BF367F35 102330~|~1~|~3~|~03/NHS~|~Minor bridge rehab > 20' span.~|~47 - Bridge Preventive Maintenance~|~1B4B4685E779569D0CD3A0E83E7C682616814898 102330~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4D83F9127F7A7C3698D8307E4D564A463DCCF86B 102330~|~1~|~4~|~04/NFP~|~Bridge hit repairs.~|~47 - Bridge Preventive Maintenance~|~C5C634FEBED2BC509597E0FA8761E6AB985A54C3 116216~|~1~|~1~|~01/NHS~|~Converting US 22 2-lane section to 4-lane divided highway~|~03 - Reconstruction - Added Capacity~|~83AA1246A906FF98042A18197F4D665F1181CB67 118699~|~1~|~1~|~01/STR~|~MOE SR 536 5.93. landslide repair with drilled shafts.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AFEF02604ED229F7D603947A3722FE0210CDC030 92408~|~1~|~1~|~01/IMS~|~Slide repair at SUM-IR271-10.22 in Summit County, Ohio.~|~44 - Other~|~AFEE2913C747F8904F8084510D21F6CAA8895C02 116338~|~1~|~1~|~01/STR~|~Plan Split for the Rural locations~|~05 - 4R Maintenance - Resurfacing~|~A2A1258637A0D1B885E36F47C9EAB25E5522B0FC 106654~|~1~|~1~|~01/ENH~|~Sidewalk reconstruction and street light replacement in the City of Logan. Total length of work 0.35 miles. Funded 95% federal/5% local.~|~28 - Facilities for Pedestrians & Bicycles~|~0944CC5B75BD987F77E6DC21FD1C0C970DA56523 109057~|~1~|~1~|~01/STR~|~Traffic Signal Replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~07E41D62A3FBFC58473B7658393212631642D437 109057~|~1~|~2~|~02/S>2~|~Traffic Signal Replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EC6AE925D803774F15D3976319D14BE293E61C13 87694~|~1~|~1~|~01/NHS~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~34A145B2E1A08FE206C44A92BE8138293009AF03 104968~|~1~|~1~|~01/STR~|~Plan Split for Bridge PIC-316-4.31~|~13 - Bridge Rehabilitation~|~23516F7E917D08362BBD19091E244B607A232432 120990~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B6DCAEF6275F9CE9F3318C74585E338B91D7A231 120990~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~145FB3A9149C0351B17ABB819C753E3C5B7E527C 120990~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~20333B6F7D7D472D40D0B72522E53333D0A6BF94 126027~|~1~|~1~|~01/NHS~|~Consultant construction engineering services~|~17 - Construction Engineering~|~96E1830A3C3057B4AFE5D167CF8EC745622B9741 110444~|~1~|~1~|~01/SAF~|~Improvements at the intersection of DEL US 36 at Wilson Rd~|~21 - Safety~|~E72A2E43C92C75406529F2325AD641D1E878CD08 116108~|~1~|~1~|~01/SAF~|~Pedestrian safety improvements in front of Vinton County High School. VIN 50 16.57-16.72. Safety Funded.~|~21 - Safety~|~C4E461A025ECBC79B3990149870AD4F6123B9EF7 107563~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7~|~05 - 4R Maintenance - Resurfacing~|~333F729650945A65FC8AF624977F0E1A4DA655B2 112845~|~1~|~1~|~01/NHS~|~DEL-23 from 10.81 to 14.37 (excluding Urban System)~|~05 - 4R Maintenance - Resurfacing~|~99E1C4E2544EE0543C194FCEA32EBE030EF2DD85 112845~|~1~|~2~|~02/S50~|~Urban System (City of Delaware) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~BC1BF260E135257A291BFFE3914798E6C48541C4 109834~|~1~|~1~|~01/NFA~|~LAW 775 9.53-18.50~|~05 - 4R Maintenance - Resurfacing~|~3216E6F35A30AA0381ECEE788D9C8D72D8E9DF0F 109834~|~1~|~2~|~02/NFA~|~Bridge preventative maintenance~|~47 - Bridge Preventive Maintenance~|~355915C6F895A1078021D7CA8AE1BEF6EB4B7567 126309~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~19BF9799F0CBC39C7937C892AE86FDCD1B0DB6BA 103330~|~1~|~1~|~01/NHS~|~Retaining wall maintenance and repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D320EDC15EF39AC643BD0C31BA22CD906C8A2D08 92737~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 1.95-1.99. 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~509E0E9A7B428CAAD36B75EE4374D841EA66B490 111219~|~1~|~1~|~01/MPO~|~MPO funded plan split~|~05 - 4R Maintenance - Resurfacing~|~013FE533B99743DD6CC5F2D921419048493E76E6 111219~|~1~|~2~|~02/NFP~|~Additional pavement on Main St to be paid by LPA thru OPWC funds~|~05 - 4R Maintenance - Resurfacing~|~6919547577554E9D325124AADBCBAB7A16EC1041 121206~|~1~|~1~|~01/S5K~|~Major Bridge Rehab~|~13 - Bridge Rehabilitation~|~92397912B35FD39D67704E391D71A50CBBFDC43D 110274~|~1~|~1~|~01/NHS~|~Construction of traffic signals and fiber optic interconnecting system in the City of Marietta. WAS 7 21.86-22.20. NHS route funded 80 federal CMAQ/20 local.~|~21 - Safety~|~2F7953CDE5A27FD4D6473E1887EA217C525FF547 110274~|~1~|~2~|~02/SAF~|~Add supplemental signal heads for southbound (Acme) traffic. The project will also shift the existing signal heads to better align them with the Acme approach. An RRFB (rectangular rapid flashing beacon) will be added to the Jefferson St crosswalk.~|~21 - Safety~|~B7C374EAEB74A9007B70B24C73C51E12CF1E12B8 114598~|~1~|~1~|~01/STR~|~Overlay on BRO 68~|~05 - 4R Maintenance - Resurfacing~|~26FFC97907AA0E8CB48837DDDEE7508DCD513915 77413~|~1~|~1~|~01/IMS~|~Split for the pavement portion of the project.~|~07 - 4R Maintenance - Relocation~|~50808B52C3EF884940CEC9C9FA2A318129CAE04C 77413~|~1~|~3~|~03/IMS~|~Split for the bridge portion of the project eligible for BR funds: 1808192, 1800183~|~07 - 4R Maintenance - Relocation~|~70F1B4B4BDBAC504C56D7D0E70DFACE30A7C0665 77413~|~1~|~2~|~02/IMS~|~Split for the bridge portion of the project: 1808222, 1800213~|~07 - 4R Maintenance - Relocation~|~9D11C4A1A9ACE6DEA79900ECEB5F0F251504896B 92733~|~1~|~1~|~01/NFA~|~To perfrom microsurfacing/crack sealing of roads and parking lots in the following ODNR park areas (see PID 91814): 1.) Lake La Su Ann in Willams County - microsurfacing 2.) Oxbow Wildlife Area in Defiance Co. - microsurfacing (D-3) 3.) Fulton Lake in Fulton Co. - crack sealing~|~44 - Other~|~E4B62E01504428D224816369BBE198FBE76EC619 116647~|~1~|~1~|~01/NHS~|~SAN-20~|~~|~D1B6DDE676FA6B5A9DD3E920FB58F9BFAC9BAFE3 116647~|~1~|~2~|~02/STR~|~SAN-6~|~05 - 4R Maintenance - Resurfacing~|~184733132AE27A4FF9B9DF5157DE4C898C931865 95674~|~1~|~1~|~01/S>2~|~Douglas Rd from Sylvania Ave to Laskey Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9B14A9CAF2F6C8A2E588C1F25B5CD67D5F16E3FD 95674~|~1~|~2~|~02/NFP~|~Cost above caps and for items paid for with 100% local (waterline)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7BE3FA2A64E7E46B3429C85D9B57736FD526A96D 117244~|~1~|~1~|~01/SAF~|~Shoulder widening and vertical profile improvement on GAL 850 0.22-1.87 and GAL 850 3.52-4.61. Includes rumble stripes. Safety funded.~|~21 - Safety~|~FA617AF5064F4913725678C0D6D4E7DC21D33446 101481~|~1~|~1~|~01/NHS~|~DSR# COL-003~|~04 - Reconstruction - No Added Capacity~|~00DD84F07DAF23D211345EC025E58AFE472B200D 85365~|~1~|~1~|~01/ENH~|~"01/ENH/OT/HCPD" - Project termini from US 62 near Brinkhaven to CR 25 at Glenmont (~7.47 miles). Construct combination bicycle/buggy/pedestrian path on abandoned railroad bed. 16' wide trail plus 2 foot paved shoulders. Includes work on five bridges/culverts and one new culvert at CR75 (6 structures total). (Using OH384 earmark for design.) Phase 5C programmed under PID 86052.~|~28 - Facilities for Pedestrians & Bicycles~|~81BFB68AB4C57B064D23717B53E8E6B025CA4598 84491~|~1~|~1~|~01/IMS~|~Resurfacing and pavement repair on I-71 from Sr 126 to north of Pfeiffer Road. Highway signing to be included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~18B0B4C52794C86AC7233D6138FCF6CC6C3C31EB 84491~|~1~|~2~|~02/IMS~|~Work to include all bridge costs associated with Bridges HAM-71-1581L and HAM-71-1581R.~|~13 - Bridge Rehabilitation~|~942CA16267D886A1F992F55A8236DA93C3996887 99657~|~1~|~1~|~01/S>2~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~6EFBA98E48ABD4F538BD8398082F776386C666DC 105517~|~1~|~1~|~01/S>2~|~Generic Plan Split for urban routes in the project.~|~17 - Construction Engineering~|~6153BCFEC73063CD2DCA2CAFAE05ECB9F00EF53C 106359~|~1~|~1~|~01/S<2~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~46FBBBFA21A64391CDD34806B4AA61B464180704 113268~|~1~|~1~|~01/MPO~|~Split 1 for MPO-funded resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~1A49005D854BFA7D160E66B6D979B7F7836FCD67 113268~|~1~|~3~|~03/NFP~|~Plan split for landscaping and other work at 100% local cost.~|~21 - Safety~|~44C39566BD41CC809D331ABFA2CCFAD675C64A4C 113268~|~1~|~2~|~02/SAF~|~Plan split for pedestrian safety improvements & sidewalk connectivity.~|~21 - Safety~|~1F9F7D808FAEEA2F66B02E0F711ACCC91B20B621 118870~|~1~|~1~|~01/STR~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~6EC9D248ED72C42EDE35DCC19881933ED8C83DDD 118870~|~1~|~2~|~02/S5K~|~STP plan split.~|~05 - 4R Maintenance - Resurfacing~|~48981ED760A39D0914595B5B5A4423D88119323D 118870~|~1~|~3~|~03/NHS~|~NHS plan split to linked roadway/bridges.~|~05 - 4R Maintenance - Resurfacing~|~7F390FFE7BFC06CD54E2504B06716FBF7C7E5FBC 123856~|~1~|~1~|~01/NFP~|~Districtwide plan split.~|~~|~0F7CEDECB56B44894DCB4F37FB344464454D7DD9 80556~|~1~|~2~|~02/NFP~|~Painting the Big and Little Lucas Cranes.~|~17 - Construction Engineering~|~2E830C65DB1A0594F574F39E29E36721E72C8184 80556~|~1~|~1~|~01/BRO~|~4805917 LUC SR65 5.35 Intersect: MAUMEE R CSX RR SUMMIT~|~13 - Bridge Rehabilitation~|~5F37C803776BDA8825294D0D2FD6B317D1DC183F 124898~|~1~|~1~|~01/ENH~|~MPO TAP funding~|~28 - Facilities for Pedestrians & Bicycles~|~80AE0307F6070AC3FC49C91803D133EAA8BBF989 118790~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay without Repairs including bridge maintenance ERI-2-7.72 to 15.739~|~05 - 4R Maintenance - Resurfacing~|~B1BE0A3E55E8964A1BE9072DE79213F559D793B0 118790~|~1~|~2~|~02/S50~|~Asphalt Concrete Overlay without Repairs ERI-4-8.240 to 10.590~|~05 - 4R Maintenance - Resurfacing~|~4E522F40621A9230F2F0AA6B0D03D8FE6B0DC9AB 87099~|~1~|~1~|~01/S>2~|~Crack Sealing on the General System for FY2015~|~47 - Bridge Preventive Maintenance~|~DFAE62A4F403A8B8794E4BC0B44C9FB5B34BC6AC 124099~|~1~|~1~|~01/IMS~|~Bridge Hit Repairs~|~13 - Bridge Rehabilitation~|~87DDA43A80EFCE041BB6FA0911119D79FC5E5211 127161~|~1~|~1~|~01/STR~|~Conduit replacement.~|~04 - Reconstruction - No Added Capacity~|~DC3175836EF12BE30A3D95B2D9029380D54C52C2 98009~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~B537BC6EB743E4240A31668685682D2663366F4A 116242~|~1~|~1~|~01/NHS~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~77FEB6ADB0108C32347364CE6623B7E741A644FB 84727~|~1~|~1~|~01/MPO/TCE~|~Widening and resurfacing of Bedford Road(CR175), including add type 6 curb and storm sewer replacement/upgrade, Trumbull County, Ohio.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~322D70A38CDF44D1FE29E5537F36E128040ECC3B 113530~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~99240544156C73F98305D047368E2F3D2264D8B0 122860~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing of 11th Street entrance/maintenance facility parking, Crack seal and seal coating of parking lot north of Celeste Center. ~|~05 - 4R Maintenance - Resurfacing~|~687B3B9588B11D77FEEF49697F48CD12DAA058DE 122860~|~1~|~2~|~02/NFA~|~Pavement repairs and resurfacing of parking area by the Ohio Village Entrance and Historical Records Storage at the History Connection~|~05 - 4R Maintenance - Resurfacing~|~437BC3598AD2693D33DB5ABCA36904B7AC7B094E 123851~|~1~|~1~|~01/SAF~|~100% HSIP funding up to $300,000 for eligible expenses, 100% local after HSIP cap or for ineligible purchases~|~21 - Safety~|~FC1CB10A750157BB03D2716B9FFE6BAE92456EC6 119487~|~1~|~2~|~02/NFA/LCEO~|~Non-Federal aid eligible items.~|~04 - Reconstruction - No Added Capacity~|~1ED79D4DDCFB45BA3EE770158B16612EA90AC590 119487~|~1~|~1~|~01/MPO/LCEO~|~Reconstruction of Pike Street East of SR 310.~|~04 - Reconstruction - No Added Capacity~|~AACE91E41DCA40A04BB3C427A8A4F4CBD60054BF 95156~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - District Preservation Block PID - 4PS7 (100% State) - Blcok PID for Construction Inspection costs~|~17 - Construction Engineering~|~8E11B3BA2A8D520028710F991076D4DDCE07DBF4 83062~|~1~|~2~|~02/STR~|~SCI SR335 Resurfacing Project3.74 to 8.38 Rural portion On SR335, beginning at the RR overpass (SLM 2.64), which is 0.73 mile north of the Portsmouth Corp limit and go north for 8.38 miles (SLM 8.38), it is proposed to resurface the highway with asphalt concrete.Brdgs are pave thru.7304897 SCI SR335 4.36 Intersect: Trib. Of Little Scioto7304951 SCI SR335 6.09 Intersect: Stream7304994 SCI SR335 6.98 Intersect: Blake Hollow80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~0B03FEB5DA8E61FBA84E0B08B5456F18730A89CC 83062~|~1~|~1~|~01/SAF~|~SR335 Guardrail & Paved Gutter Safety Project On SR335, 0.05 mile south of Swauger Valley Road to RR overpass. it is proposed to upgrade and relocate guradrail on the east side of SR335 and at the intersection of Swauger Valley Road and install paved gutter on the west side of SR335.This project was PID 93797. Refer to 93797 for PE and RW PhasesCO Phase is 100% Fed Safety Funds01/SAF/OTH/State~|~21 - Safety~|~6FA72A3E8FB11F50498F9A714D99D4C4FB0E6275 83062~|~1~|~3~|~03/S<2~|~SCI SR335 resurfacing project2.64 to 3.74 Urban portionOn SR335, beginning at the RR overpass (SLM 2.64), which is 0.73 mile north of the Portsmouth Corp limit and go north for 8.38 miles (SLM 8.38), it is proposed to resurface the highway with asphalt concrete.Brdg is pave thru.7304838 SCI SR335 2.64 Intersect: CSXT RR80/20 split02/S<2/PV/State~|~05 - 4R Maintenance - Resurfacing~|~E58A2FBBA766324D8E6290AE0B9FCFCF2244F719 126206~|~1~|~1~|~01/IMS~|~Lighting~|~44 - Other~|~FA493653E5B2E430DBCF718F4552E5994ED78258 121474~|~1~|~2~|~02/IMS~|~Deck replacement.~|~13 - Bridge Rehabilitation~|~6482E6031A5C4AE9745A3925D9D74EE2161D439D 121474~|~1~|~1~|~01/IMS~|~Reconstruction of IR 680 and ramps to and from MAH US 62 and 62D, includes culverts and lighting.~|~04 - Reconstruction - No Added Capacity~|~BDBBA5ECB83924E43C8538F3AAD9A048E97DA66B 121474~|~2~|~3~|~03/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~821AE9FDA99D7336E8BF1AAAE2450CDB09BE0212 105550~|~1~|~1~|~01/BRF~|~See linked structure >20' span.~|~10 - Bridge Replacement~|~0352042D3C6E32DB9EAB7020C35E7C597D73AF7D 94440~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~FA663A39A66A7576FA64F62820D2BD26442B9700 94440~|~1~|~2~|~02/STR~|~Culvert Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~91230D80137ED83E6E6BAA044F9D3B9796E1DBB4 122856~|~1~|~1~|~01/MPO/WARR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~040B9FEE159CCD3026AA6EBA334AB74EC4EE6EBE 103922~|~1~|~1~|~01/STR~|~Culvert Replacement: HUR-269-2.79~|~04 - Reconstruction - No Added Capacity~|~B8633CBA117F95BD6B964E9D21525D399BEBF050 102405~|~1~|~1~|~01/NFA~|~SR 520, SLM 0.00 to 12.51~|~05 - 4R Maintenance - Resurfacing~|~E501403E9C3C7689484EAD9866326A78E906BB0F 102405~|~1~|~2~|~02/STR~|~SR 520, SLM 12.51 to US 62~|~05 - 4R Maintenance - Resurfacing~|~91FF2684AFFEA10B43CE369664BBFF523E05A754 91894~|~1~|~1~|~01/NFA~|~Replacement of a structure on forest road #14 at VIN Zaleski State Forest. 100% State.~|~44 - Other~|~08C499576D36BEE4EE4181AEEC748A4D95DEE2EC 16707~|~1~|~1~|~01/BRF~|~CEAO BR funds, bridge replacement of TR24/Rosedale-Plain City Road over Little Darby CreekLocal sponsor - MAD County Engineer4930878 MAD CR24 2.75 Intersect: Little Darby01/BRF/BR/~|~10 - Bridge Replacement~|~DA0226CD86B1E884D89D0D6A3AA41C3E8793674F 121720~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with / without Repairs RIC-13 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~B69793C71BC6D518708B084CD0138F628C9B0DF9 121720~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs RIC-95 and RIC-97 including bridge maintenanceFine Graded Polymer Asphalt Concrete Overlay (smoothseal) RIC-97-9.619 to 14.686 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~91534638334390EAAEDA2AB80AA6949217A71B70 121720~|~1~|~3~|~03/NHS~|~Local share of funding for pavement repairs within project on RIC-13 in Bellville~|~05 - 4R Maintenance - Resurfacing~|~6142B91543367D59D84510B950008C2A45F813CD 121720~|~1~|~5~|~05/STR~|~Local shar of funding for pavement repairs within project on RIC-95 and RIC-97 in Butler~|~05 - 4R Maintenance - Resurfacing~|~B6EFD251B36D9466D813D7D8BD17B1B3D286CDEF 121720~|~1~|~4~|~04/STR~|~Local share of funding for pavement repairs within project on RIC-97 in Bellville~|~05 - 4R Maintenance - Resurfacing~|~6659068DCFD94A28D6682C9B71062DBF7D2544BD 121720~|~1~|~6~|~06/SAE~|~Safety for RRFB installation on RIC-13 in Bellville only~|~21 - Safety~|~3DFF3FB76353D80B5BADBD870872630B93F81C3B 123243~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~21455E867915B1F0B600D78EDFCF7B0A0F269990 123243~|~1~|~2~|~02/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EA5BC7BACEC338831438BFFCF91BB4F4DB743042 123243~|~1~|~3~|~03/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0CFED952A9B93F8195DA083CF4D49F755B83916B 123243~|~1~|~5~|~05/STR~|~Resurfacing.~|~17 - Construction Engineering~|~8F793275F7F2EC56C1ABC849F2A8CDE8B4D21744 123243~|~1~|~4~|~04/S5K~|~Resurfacing.~|~17 - Construction Engineering~|~300A85CB387F3D38D55D635D1A966389387E28A4 125905~|~1~|~1~|~01/IMS~|~Establish pro rata percent~|~44 - Other~|~0AC96092B82E8C09DD2D9C9D778F34A406723736 87255~|~1~|~1~|~01/STR~|~Replace 2 12' bridges over Nickelson Wilson Ditch and County Ditch01/STR/BR/~|~10 - Bridge Replacement~|~5053DB6B923262DED268233B515CA73434B16AD8 108714~|~1~|~1~|~01/STR~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-008~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3EDD6DC75F6DA4F5358113F85B06742185855541 108714~|~1~|~2~|~02/STR~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-009~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BA1F24FEF1A52B4611A022CA9203F9C14153A49E 94161~|~1~|~1~|~01/NHS~|~The project involevs the replacement of the existing bridge (JEF-43-0092, SFN 4102037) superstructure with a new superstructure using weathering steel beams. The approach slabs will also be replaced and the substructure will be repaired as needed.~|~13 - Bridge Rehabilitation~|~27282E882F958437E521E83B19A10C3E15018935 94161~|~1~|~2~|~02/NHS~|~Added plan split for portion of work on approach pavement to be paid by local entity.~|~13 - Bridge Rehabilitation~|~4A6E8B4ABC4F907228A3757469B0E8295B007D01 94260~|~1~|~2~|~02/S<2~|~FY2016 Urban Paving in the City of Wilmington on SR 730 from just past Nelson to Truesdell/South/US 68. (CLI SR 730: SLM 10.18 to 11.43). This Plan Split is for all items that are paid at 100% City.~|~05 - 4R Maintenance - Resurfacing~|~2734089247801735F8F877194C301F25459E28C0 94260~|~1~|~1~|~01/S<2~|~FY2016 Urban Paving in the City of Wilmington on SR 730 from just past Nelson to Truesdell/South/US 68. (CLI SR 730: SLM 10.18 to 11.43) This plan split is for the items that are paid 80% ODOT and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~C69543775E11F2D2FF7F49581263A4FF4852E4A0 83067~|~1~|~1~|~01/NHS~|~Resurfacing of SR-18 from Hametown to IR-77, includes widening of SR-18 for additional lanes. Ramp widening/relocation of SR-18 Eastbound to SUM IR-77 Southbound. Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~3B85DBAF2B6970507F469729D6FEE134E9A8ECBB 83067~|~2~|~3~|~03/NHS~|~Resurfacing of State Route 18 from Medina Line Road to South Hametown Road. Including the installation of TWLTL along the whole corridor.~|~05 - 4R Maintenance - Resurfacing~|~44A25D580D1935DA3C27CF06BD2D1B3563AC788D 83067~|~3~|~8~|~08/NHS/FAIR~|~100% City of Fairlawn requested items: including sidewalks, driveways, curbs, etc.~|~05 - 4R Maintenance - Resurfacing~|~65C86D6EAEE2EC6FECFDDD0A4F3AF672CDF689A1 83067~|~2~|~4~|~04/NHS~|~Replacement of structure #7700849, at SUM-SR18-0.54, Bath Township, Summit County, Ohio.~|~10 - Bridge Replacement~|~78E5E968ECE98D624582DBFF5486D510E842CDA7 83067~|~1~|~2~|~02/NHS~|~City of Akron water line work.~|~43 - Utilities~|~9D5B7330497F44A63FD55E6FE2C2FEBBBA3F06A0 83067~|~3~|~5~|~05/NHS~|~Resurfacing of State Route 18 from Southbound IR-77 ramp to Western Fairlawn Corporation limit at SLM 2.67. Bath Township, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~C9E24A4ED35E32EE8025188917D7995D5636EA95 83067~|~3~|~7~|~07/NHS/FAIR~|~Partial and Full Depth Repairs that are the responsibility of the City of Fairlawn under urban paving.~|~05 - 4R Maintenance - Resurfacing~|~CF5CBC3A6E164FBD05DF296DC201222521A8A418 83067~|~3~|~6~|~06/NHS/Fair~|~Resurfacing of State Route 18 from Western Corp limit (SLM 2.67) to Eastern Corp limit (SLM 4.88), in the City of Fairlawn, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~D55310C071D08F26AA1499FE92064645CBAF9C29 89439~|~1~|~1~|~01/NFA~|~Replace existing bridge SFN 1239015 CLACR00300 1.61 on Tremont City Road.~|~10 - Bridge Replacement~|~A96C9DAC22DE12BC8543B7306F01A498EDAD5AD7 105043~|~1~|~1~|~01/NHS~|~Guardrail upgrade/replacement project for FY2023. ~|~21 - Safety~|~E89816D00CAD333B5EE89C7A40702E3AF5A0E349 105043~|~1~|~2~|~02/IMS~|~Guardrail upgrade/replacement project for FY2023.~|~21 - Safety~|~C832CCB5A1564D58A7E636EC092D29E3F89B6582 108397~|~1~|~1~|~01/S<2~|~Rock fall repair from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~39C4A3C12E8865C04121B299865135853F48BD1C 120251~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Mt. Vernon Ave, E Spring St, and Martin Luther King Jr Blvd ~|~28 - Facilities for Pedestrians & Bicycles~|~E3F4485798871731D37A61F375B36D28613E776A 119265~|~1~|~1~|~01/IMS~|~Mowing~|~44 - Other~|~8BCB4B703F36C18E236B9B04BC166E5AF7E37008 99698~|~1~|~1~|~01/IMS~|~Resurfacing work funded at 90% federal and 10% state~|~05 - 4R Maintenance - Resurfacing~|~1BE397F1BA0ADCF0C84957678021863A2C232380 79277~|~1~|~1~|~01/MPO~|~LAW Ironton Storm Sewer System Reconstruct storm sewer system for the on-system streets to reduce the number of overflows into the the wastewater treatment system in the City or Ironton. 80% Fed KYOVA/20% local match Ironton 01/MPO/OT/Ironton~|~44 - Other~|~3B663900E3C9B7CC9F9431CF857156F68ED05D4E 114749~|~1~|~1~|~01/NHS~|~ROS Smoothseal.~|~05 - 4R Maintenance - Resurfacing~|~0EC12110F3384EA60E5DB38ECCC42576FD9B8681 116000~|~1~|~1~|~01/IMS~|~GSM funded plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E6BAB7603392E1306224F1B37ABA087F7FBF840 117903~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I70-C, LIC 118-126~|~63 - Electric Vehicles & Charging Infrastructure~|~1B15088499D9863DDC8FD76893DF9D97E4069FF7 92716~|~1~|~1~|~01/MPO~|~Resurfacing CR 605 2.63 - 4.32~|~05 - 4R Maintenance - Resurfacing~|~C99C68A4B44AF44FA020EC3B84EDB9EDC7865894 112548~|~1~|~1~|~01/BRO~|~Plan split to program project. Update with plan split review process prior to plan file.~|~47 - Bridge Preventive Maintenance~|~FA3E162EA18B35FBC454F72F262E01D85F519069 114897~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~DB2AED8E27323D9B2E7F4D26EFAFE7ECE476BAAF 114897~|~1~|~2~|~02/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1C7AC28EE75796645088B79CC5B01C963C78C778 119720~|~1~|~1~|~01/S5K~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~3EA5486066F0628BE78F6BEB0B6A775ECBB8D4F2 107450~|~1~|~1~|~01/IMS~|~AC overlay with repairs on Interstate route:CLA IR 70 SLM 25.11 to 29.25~|~05 - 4R Maintenance - Resurfacing~|~E195B3468E9B45031E7324D47E34858EAD683F58 115183~|~1~|~1~|~01/S>2~|~Plan split for paving work. ~|~05 - 4R Maintenance - Resurfacing~|~53E59410421D2DC98817DA05FE67A33F14195F70 115183~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~8026CBBDCBDD2563BBD94E24A7801CF03A7EE5F5 117170~|~1~|~1~|~01/STR~|~Widening of County Road 82 in Tuscarawas County~|~21 - Safety~|~5D972FCD76B43B24574D4BDEE8A11C16362B615F 107567~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project~|~21 - Safety~|~EF9243C5C368FE8C118B94850C786EA1528CF517 126688~|~1~|~1~|~01/NHS~|~Abutment repair on MAR-23-7856, MAR-23-9180, MAR-23-1005 and UNI-33-2358~|~13 - Bridge Rehabilitation~|~9097322EFEDA963A90E3E9EB0BFDEB00ED791FAE 126688~|~2~|~2~|~02/BRO~|~Abutment Repair on MAR-309-2920~|~13 - Bridge Rehabilitation~|~99CD668359121E30F56D92398BB33FC16B26DDFA 97611~|~1~|~1~|~01/STR~|~Geologic Site Management Project - 80/20 Fed/State 4SF7/4SS7~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F5B8B537FE2A4DFA503A3BC5DD6A3EA9411BD2F0 108014~|~1~|~1~|~01/CMQ~|~Construction of a bike/ped crossing along Thornton Avenue, across River Road (US-50), existing RR tracks, and connecting into the trail system at Fernbank Park.~|~28 - Facilities for Pedestrians & Bicycles~|~EDCD7CED433933BCE9CDB63BC417D4B2F47661D4 115756~|~1~|~1~|~01/S>2~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on HAM-22 ~|~05 - 4R Maintenance - Resurfacing~|~ED03FA80A2DCE837039F8FE81CDCD7A13AEF64CA 115756~|~1~|~2~|~02/NHS~|~Plan split for the 80/20 (ODOT/City) items on the NHS portion: SLM 1.11-1.43 ~|~05 - 4R Maintenance - Resurfacing~|~B4AFA2ABFC8723615D4AF871B48FA84A0CAE6A06 115756~|~1~|~3~|~03/MPO/CIN~|~Split for the OKI STBG funded work - road diet on Gilbert from Court Street to MLK. Addition of bike facilities and curb bump outs at intersections.~|~21 - Safety~|~ECFB776CEAC8A67F72A705D85A466271A4BCCBAE 115756~|~1~|~4~|~04/NHS~|~Added funding event for NHS that is OKI eligible~|~21 - Safety~|~EA55A97C4326844B716126DFC9C48E4B50EDA812 115756~|~1~|~5~|~05/SAF~|~this split is to cover any item not allowed to be paid with federal funds such as the blanket contingency~|~~|~CB3AB89D5AE9D9B07DE9DE9C65CBC0FDDE232B4F 115756~|~1~|~6~|~06/MPO~|~this is to cover the split 5, any item that is 100% local cost such as the blanket contingency ~|~~|~0ACDE3E953F645F1597B6685A3B46F87EB4F48D0 109303~|~1~|~1~|~01/SAE~|~Install new raised pavement markers~|~21 - Safety~|~8A0CC81C80D085322C43BB3A74BE4E3BC891D8E0 77531~|~1~|~1~|~01/NHS~|~Resurfacing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ACE12160E857B2B2D14053BBD19738E428D12077 118690~|~1~|~1~|~01/NFA~|~Excavation of cut slope, ditch drainage improvement and Installation of Geocell wall to address slope failure along SR 555.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5DDD42D173679521B7E7A104EB3591BC1BF137FC 96462~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 141 0.00-7.74. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~858A2341288F0862FD306F14823BCE6BB3CFDBF5 92746~|~1~|~1~|~01/NFA~|~Lands & Building state funded project to demolish the old existing salt shed and replace with a new shed~|~44 - Other~|~22DF5C77AACF9C0C728AA6F3EF679785234131D4 112999~|~1~|~1~|~01/STR~|~Split for bridge replacement work~|~04 - Reconstruction - No Added Capacity~|~14AE1B22EB79EBDCB9EECD93E6D184B65F048FF2 116841~|~1~|~1~|~01/MPO~|~Plan split for federally eligible funding of Heartland Trail Phase 4A~|~28 - Facilities for Pedestrians & Bicycles~|~8070C6C49AD12DF49209D3E935BB940535DF26DC 126978~|~1~|~1~|~01/SAF~|~Split for CEAO HSIP eligible expenses ~|~21 - Safety~|~3D3E2771FDC87A128AE762FC7AE4FD121016EC77 116012~|~1~|~1~|~01/NFA~|~Replacement of the superstructure with prestressed concrete box beams with a composite concrete deck. Also, minor substructure modifications/repairs, as well as related roadway restoration.~|~10 - Bridge Replacement~|~EA0AEE7A7A7F4A212309195E4421E33106268FB8 108444~|~1~|~1~|~01/CMQ~|~CMAQ Plan SPlit~|~21 - Safety~|~1D4A0024D1F8872AD4CC2DF7665266AA7BAC11BE 119105~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~2456B230919556E28C7ABA62FC7A75FF32568CF5 119105~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~D8A34FDD43E8FAA54AF385B91F5824B57564E24B 105250~|~1~|~1~|~01/STR~|~Spot paving project for District 11~|~05 - 4R Maintenance - Resurfacing~|~DA5C89AB0A59F408BC046374EEF675B8BB76A2FE 94578~|~1~|~1~|~01/NFP~|~Port Clinton lift bridge over the Portage River.~|~40 - Special Bridge~|~24F5B2AEDC9DF536506C08EFD04BBC13E0657EFE 109010~|~1~|~1~|~01/ENH~|~All work in this project. 95% federal funds with Toll Revenue Credit (TRC) from the Transportation Alternatives Program (TAP). The local match and any funds needed after the cap is reached will be provided by the City of Van Wert.~|~28 - Facilities for Pedestrians & Bicycles~|~250164AE310C6BDEF914E11CB89D4AA65D8A6774 99595~|~1~|~1~|~01/MPO~|~Resurfacing Laird Ave from Youngstown Rd to Atlantic St, Genesee Ave from Market St to Elm Rd, Woodland from Elm Rd to Perkinswood Blvd using rubberized asphalt on asphalt leveling course. Includes incidental drainage work, new pavement markings, sign upgrades and ADA curb ramps. Also includes curb and sidewalk replacements and linear grading where needed.~|~05 - 4R Maintenance - Resurfacing~|~8FF0AB3E6D979D1B80A1CCFB5F97D2C9CE45D62A 121485~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E28EA48E1E9D02E501534F4FD567819B9DBEA995 121485~|~1~|~2~|~02/S5K~|~STP 5,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E0B5942AA7B10C128AC3D766AB8610A0181E1378 96239~|~1~|~1~|~01/STR~|~STP Rural. SR245: 0.00-7.65; SR347: 4.23-8.10~|~05 - 4R Maintenance - Resurfacing~|~24D0AEA0217436BE978E11866047364F3A62DFCD 108007~|~1~|~2~|~02/STR~|~RIC SR 0546-09.00 School Flasher Upgrades~|~44 - Other~|~B86BB95EC436D5194EEE97226A33564415187512 108007~|~1~|~1~|~01/NHS~|~Lighting~|~44 - Other~|~3D9C0DAE0BC95990384AD8C9BC5C6F3C0DE7C9DD 84453~|~1~|~1~|~01/STR~|~7305222 SCI SR335 14.52 Intersect: Stream80 fed/20 state 01/STR/BR/State~|~13 - Bridge Rehabilitation~|~8F727055FD0D4461AA613E4596FAFA13DFB130FF 117269~|~1~|~1~|~01/SAF/HUDS~|~Safety improvements, road diet, restripe to reduce number of through lanes and converting pavement to turn lanes.~|~21 - Safety~|~B9D6312C9F132492E3A2A1442E3A29D0A5429AA5 127132~|~1~|~1~|~01/SAF~|~Improvements to CR 5 (Sabina Road) including improvements to vertical and horizontal roadway alignment, widening of pavement and shoulders, and removal of fixed objects from the clear zone.~|~21 - Safety~|~2B292B1DA7C2B7FBE6385EEDF75265F59A9E535B 100855~|~1~|~1~|~01/STR~|~JAC 279 0.00-11.45 & 11.86-12.48~|~05 - 4R Maintenance - Resurfacing~|~F1BC8D89F20B8E29A3CA010869220C2C2E532E3F 93511~|~1~|~1~|~01/CMQ~|~2 Park & Ride areas near SR213, SR7 and US22 within ODOTs RW. 100% STP funding from BHJ MPO. One park and ride is going to be expanded and the other one will be new construction.~|~21 - Safety~|~B461232AB7095745326398A1CD5A5827C2DE86DD 97687~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 10.49. GSM funded. Not on any federal aid system funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~374F7BA06A3E9AB4B3E38210BE7A5D2AB04DBD8F 114807~|~1~|~1~|~01/STR~|~MRW-61 from SLM 3.42 to SLM 13.15~|~05 - 4R Maintenance - Resurfacing~|~0405D8EE6F180BE4627F2AB5E027B54580AEACF0 109623~|~1~|~1~|~01/S<2~|~Asphalt resurfacing SR 211~|~05 - 4R Maintenance - Resurfacing~|~72EA67C75FB940EF32BA80994BD3BC1FE70F28BB 109623~|~1~|~2~|~02/S<2~|~100% City Items~|~05 - 4R Maintenance - Resurfacing~|~B54C9362CF422AF6B9470B43ED8CDF2B7BAB6DDD 121139~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~E09D3DCF80D53A89A8E4C663630140A0F0C64891 121446~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work on HEN-24~|~05 - 4R Maintenance - Resurfacing~|~D37C3980DC9927AB6AFFF86F8F11DCA982AE4F4D 108069~|~1~|~1~|~01/STR~|~Landslide repair as part of 2018 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~769431038BC74297A4A2374AF1179AC27379C63F 127059~|~1~|~1~|~01/SAF~|~Sidewalk replacement project along WAS SR 60 from Dollar General to the SR 530 intersection. Curb extensions and as RRFB will be added to the SR 60 crosswalk at the bridge intersection. Replace the existing signal. New signal will include ped heads, pushbuttons, and lighting. WAS 60 10.28-10.68 and WAS 530 0.00-0.02.~|~21 - Safety~|~C29AC9568BDB40B0DDC90AA269E7599F86B92593 111059~|~1~|~1~|~01/MPO/CANT~|~Construction of bike trail along Colonial Blvd NE in the City of Canton.~|~28 - Facilities for Pedestrians & Bicycles~|~94B6F66A56E171284928DAC764503732077C0577 95290~|~1~|~1~|~01/STR~|~MAD-29-10.09 culvert; MAD-42-21.36 culvert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7142C9E1F6D3C16BEE67294394780B55241B3274 105537~|~1~|~1~|~01/STR~|~"01/STR/OT/" - Geological Site Management Funding - 4SF7 (80% Federal)/4SS7 (20% State) - Rock scaling at PER-13-8.99 and PER-93-7.72.~|~~|~DD2A523B1E64487E40802FF9AEA71EA1EFBD8460 107351~|~1~|~1~|~01/STR~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%.~|~21 - Safety~|~A1D58BE86108633DF43DE4EB7554762555E7EFE9 107351~|~1~|~2~|~02/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%.~|~21 - Safety~|~BA2EA3C9DDDFDC712F23597D5EC97D081D9ABD87 107351~|~1~|~3~|~03/S5K~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%.~|~21 - Safety~|~915D5B919FC882CD80983289626E3199FB74CE4F 107351~|~1~|~4~|~04/SAF~|~City of Marietta to add traffic detection cameras to intersections WAS SR 7 22.20, WAS SR 7 22.37, WAS CR 50 1.35, WAS CR 50 1.54 and WAS CR 50 1.80. Funded 100% Local.~|~21 - Safety~|~3495B51C0D15348A2E4BDF1AA6581522D73B7A1D 124989~|~1~|~1~|~01/ENH~|~MPO TAP funding~|~28 - Facilities for Pedestrians & Bicycles~|~A9497CC23078223EE64D527E58DBF71D2036A7DB 106424~|~1~|~1~|~01/NHS~|~UPP - 2" AC overlay~|~05 - 4R Maintenance - Resurfacing~|~5D0B33D46AB5A9A6D17C15F48790D52E9C7E08CC 123795~|~1~|~1~|~01/NHS~|~NHS~|~05 - 4R Maintenance - Resurfacing~|~960501F67B3FE8A9A6AD2872012B279D001AEBC5 123795~|~1~|~2~|~02/STR~|~stp rural~|~17 - Construction Engineering~|~F466298D8CB666B4E1411C40F60CDC1A1AE7927C 99088~|~1~|~1~|~01/IMS~|~Work on the interstate system. All work in this project is in this split. All funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~39F6553B8B4C04FEC3E2B316DDD4AC5E70726442 99088~|~1~|~2~|~02/NFP~|~For work in the rest areas. Rest Area funds SAC 4BR7 from ODOT Central Office.~|~05 - 4R Maintenance - Resurfacing~|~58EA8A2FFDB1E5D0BFF4BF4E91636C0F898DDC6B 107324~|~1~|~1~|~01/NFP~|~Split for work on the interstate system.~|~99 - State Preventative Maintenance~|~BD320C8B05612FE1601B2F0651A24248857CFA6F 121303~|~1~|~1~|~01/STR~|~All Work is within this split~|~47 - Bridge Preventive Maintenance~|~ED02FB1A13F939BF4AD9D46777BBC830C6516F4B 92226~|~1~|~1~|~01/S>2~|~100% State using District Preservation funding~|~44 - Other~|~63A7255A98CCA58197964C1139C10B947450E9E8 99719~|~1~|~1~|~01/NFA~|~Bridge maintenance project. Work includes pile encasement on MRG 555 1694, SFN 5801958. Not on Fed. Aid System, 100% State funds.~|~13 - Bridge Rehabilitation~|~26A91029FDEA33EA89AD8F79DD02C7B36DAF50A6 95545~|~1~|~1~|~01/MPO~|~It is proposed to reconstruct the drainage system and purchase RW easements to the Ohio River.440070027 LAW 00007 2.451440070028 LAW 00007 2.461440070029 LAW 00007 2.501440070030 LAW 00007 2.53440070031 LAW 00007 2.561440070032 LAW 00007 2.651440070034 LAW 00007 2.741440070033 LAW 00007 2.751440070036 LAW 00007 2.871440070037 LAW 00007 2.881440070035 LAW 00007 2.891440070038 LAW 00007 2.931440070039 LAW 00007 2.991440070040 LAW 00007 3.011440070042 LAW 00007 3.14440070043 LAW 00007 3.14440070044 LAW 00007 3.23440070045 LAW 00007 3.311440070046 LAW 00007 3.361440070047 LAW 00007 3.391440070048 LAW 00007 3.391440070049 LAW 00007 3.421440070050 LAW 00007 3.461440070051 LAW 00007 3.461440070052 LAW 00007 3.521440070053 LAW 00007 3.571440070054 LAW 00007 3.601440070055 LAW 00007 3.681440070057 LAW 00007 3.741440070058 LAW 00007 3.741440070059 LAW 00007 3.761440070060 LAW 00007 3.771440070061 LAW 00007 3.821440070062 LAW 00007 3.861440070063 LAW 00007 3.93180/20 Split~|~04 - Reconstruction - No Added Capacity~|~5E9CD6F27C3581BA026EC4801A2B71D2F7113369 95545~|~1~|~2~|~02/MPO~|~This plan split is to cover the cost of unforeseen utility for Aqua Ohio.~|~~|~1CFA645E52AE11A96E24AF4DD0F0B5B4E6255D47 120324~|~1~|~1~|~01/NHS~|~Plan split for all work on project~|~04 - Reconstruction - No Added Capacity~|~A6010EA9B3A38CBBDA7DD338B939BC68FD80182D 120062~|~1~|~1~|~01/NFA~|~Resurfacing in Fernwood State Forest~|~~|~839A71F7B42E9B8A3884221D2F3092162C636871 87938~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile encasement work on 1) 1601342 COS SR83 19.56 Intersect: Trib Of Turkey Run: Not BR Eligible: Length=48 SD/FO(0) SR=92.4 DSR=7; 2) 1601393 COS SR83 20.27 Intersect: Over Turkey Run: Not BR Eligible: Length=55 SD/FO(0) SR=90.2 DSR=7; 3) 4504607 LIC SR79 1.15 Intersect: Over So Fork Lic River: Not BR Eligible: Length=141 SD/FO(0) SR=98.9 DSR=7; 4) 4505085 LIC SR79 23.89 Intersect: Trib Of Rocky Fork: Not BR Eligible: Length=50 SD/FO(0) SR=87.8 DSR=6; 5) 4505115 LIC SR79 24.21 Intersect: Sr79 Over Rocky Fork: Not BR Eligible: Length=141 SD/FO(0) SR=79.1 DSR=7; 6) 4505158 LIC SR79 25.04 Intersect: Sr79 Over Painter Run: Not BR Eligible: Length=108 SD/FO(0) SR=91.2 DSR=7; 7) 4505174 LIC SR79 26.18 Intersect: Sr 79 Over Painter Run: Not BR Eligible: Length=125 SD/FO(0) SR=80.1 DSR=7;~|~13 - Bridge Rehabilitation~|~37CAEB0F698136AB874087B89B2250A093919846 87938~|~1~|~2~|~02/BRF~|~"02/BRF/BR/ " - State Parks ODNR 4BF7 (State 100%) - No CAP - Rehabilitation on 3026175 GUE 001SP 5.7 M N OF JCT US 22Intersect: OVER SALT FORK LAKE; BR Eligible for Rehabilitation: Length=145 SD/FO(1) SR=58.3 DSR=4~|~13 - Bridge Rehabilitation~|~ACABB28AEB77658845543D3A09BE3033B671DF2F 118700~|~1~|~1~|~01/NFA~|~Plan split for bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~CC8632386A587182EA5954D48534181082E44997 81595~|~1~|~1~|~01/S<2~|~4401255~|~17 - Construction Engineering~|~93CB7067154034DFA8D1A38CDB7C65C5085D5535 112699~|~1~|~1~|~01/NFP~|~RPM~|~21 - Safety~|~4EA2949C3D2D2D46FA6C2A9ED74E16FE64F1F182 111003~|~1~|~1~|~01/NFA~|~The VILLAGE will add a 285' eastbound turn lane west of Herman Street along Monroe Street (SR274) to new plant entrance and a 100' westbound left turn lane. The turn lanes will be 11'5" wide with base and asphalt wearing course.~|~44 - Other~|~43421AA4DA4254581744F1EDC77CC5F273921DDE 98248~|~1~|~1~|~01/NFA~|~Bridge replacement project. GAL CR 71 0.90, SFN 2742322. Removal of superstructure and selective demolition of piers, abutments and substructure and replacement to include widening to meet federal guidelines with minimal vertical and horizontal alignment modifications. Not on the federal aid system funded 80 federal/20 local.~|~10 - Bridge Replacement~|~32D5731ECD5D4B846E58F94B7EFCBEFB81CAFEAA 98248~|~1~|~2~|~02/NFA~|~100% local (lntp) item to fund a plaque on the bridge.~|~~|~52AC374E170CEA5C57B42782A85EECA1AF698C35 98248~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~9FB9BAD8BDE9668F018881B7C7703648B38B3998 125577~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~93392D41AEDACA3B9EEDF7B3E724DDBE5DF5354F 90328~|~1~|~1~|~01/TRN~|~100% funding plan split. Funds undetermined at this time.~|~01 - New Construction~|~228DF3ECF964CBBF4F4C05DFE3C4FCF8DD140566 118774~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~04A4F3DF1484D805F8B20850D94D47D430EFA0E3 123591~|~1~|~1~|~01/STR~|~Funding split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~1892D805F3437E6A4F4381D49FBA98DFEC998B38 115934~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 147 16.83, SFN 6103065.~|~04 - Reconstruction - No Added Capacity~|~E1B70A71C9325C97F848672DDDF41EC0B240C0F3 94139~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 46 from 8.54 to 8.64.~|~05 - 4R Maintenance - Resurfacing~|~15C0B2DB902D059D74E343D95DD947405129412C 94139~|~1~|~2~|~02/S>2/CANF~|~Resurfacing of MAH SR 46 from SLM 8.81 to SLM 9.29, and US-62 from SLM 7.61 to SLM 8.40.~|~05 - 4R Maintenance - Resurfacing~|~19C6AEA47AF7945F336D6027D8BB3D9387C75B89 94139~|~1~|~4~|~04/NHS~|~Resurfacing of US-224 from SLM 11.28 to SLM 11.41, in Canfield Township.~|~05 - 4R Maintenance - Resurfacing~|~7D9A2E56A5FEFEEA9014F54B867C75DD643C52A8 94139~|~1~|~5~|~05/NHS/CANF~|~Resurfacing of US-224 from SLM 11.41 to SLM 12.69 in the City of Canfield.~|~05 - 4R Maintenance - Resurfacing~|~4DD7EE835A8456411B8CE5618CF72DFEA2EE91BB 94139~|~1~|~6~|~06/NHS/CANF~|~100% City of Canfield items per urban paving policy.~|~05 - 4R Maintenance - Resurfacing~|~A477403D358F50F149F348D9E4D9C0E44A377940 94139~|~1~|~3~|~03/S>2~|~Resurfacing of MAH SR46, from SLM 8.64 to SLM 8.81.~|~05 - 4R Maintenance - Resurfacing~|~2D256ADB73CDF892B8D02ADF2F6FD27FF95B71A7 100666~|~1~|~1~|~01/STR~|~Chip sealing CAR-39 from SR 524 to JEF Co. Line, CAR-164 from SR 212 to SR 332, CAR-212 from TUS Co. Line to SR 39 and CAR-212 from Leesville NCL to the HAS Co. Line.~|~05 - 4R Maintenance - Resurfacing~|~B19D6DCFBA2CDA2A47F14E89B6BB4AB1FF9D13B7 100666~|~1~|~2~|~02/NFA~|~Chip sealing CAR-524 from the JEF Co. Line to SR 39.~|~05 - 4R Maintenance - Resurfacing~|~67A94456AF59506146344848A60A13D90EB3BAD9 119101~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~1A178ECA4C29FE2A3F4B1D35732B1C11A8E9CDFA 111661~|~1~|~1~|~01/NFP~|~City will construct a full depth replacement of Romig Road between Vernon Odom and Kendale roads as well as widening of 7900 feet of roadway.~|~44 - Other~|~28B0720BBE9F95AEE79D3F6ED2223866A2D7AB44 111661~|~1~|~2~|~02/NFP~|~OPWC~|~~|~618E77FB64C8948AA1D19F705BD793296FE839EC 111661~|~1~|~3~|~03/NFP~|~Summit County~|~~|~864ABBCDE581E3D51BF4F20D7C22D98BB34AC910 111661~|~1~|~4~|~04/NFA~|~City of Barberton~|~~|~B00436362891785AC815FCB3EABBEA2CAF27220D 111661~|~1~|~5~|~05/NFP~|~City of Akron~|~~|~7ACD1E2C3507171DF0D2F31133CC4BA7AC6BE3A7 95365~|~1~|~1~|~01/STR~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~BA2477ACF69FA763202D3693ACF499637DF9F994 94125~|~1~|~2~|~02/S>2~|~Bridge Maintenance SFN 7605994 SR 236 SLM 3.22 over Mudbrook Creek.~|~~|~9C3078CB175E4B1EF496EB351B97BFE94995FD06 94125~|~1~|~3~|~03/S>2~|~Resurfacing of State Route 236 within the Massillon city limits, Stark County, Ohio.~|~~|~E928AD59013899A92E372EE01F8D0335F70028EA 94125~|~1~|~1~|~01/S>2~|~Resurfacing of STA SR 236 from SLM 0.00 to 5.50 (0.00 to 0.41 in the City of Massillon).~|~~|~EBA85854E677AE663A5CC51C8C3929CD9D281258 110080~|~1~|~1~|~01/STR~|~Repair/replace culverts on rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D03A50ED87A2C5AB786A580714617727A0404D68 110080~|~1~|~2~|~02/S>2~|~Replace/repair culverts on Lrg Urban routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9ED0FF68B7E2A0E72B0B21CE6F5C3CE329C0A41A 75107~|~1~|~1~|~01/MPO~|~MCCord Rd RR grade separation.~|~08 - Bridge - New Construction~|~7C11F45E9A3EC2EBA47341FB4C4C836CDDCC01C7 75107~|~2~|~2~|~02/MPO~|~This is for part 2 of the plan to address the sanitary sewer.~|~08 - Bridge - New Construction~|~E88EE4937F6A072A9143D44C7924C9E79FA90C03 109098~|~1~|~1~|~01/NFA~|~30 x 50 Fabric Material Storage Building ? Milford Outpost~|~01 - New Construction~|~36B169D64BC6E261AA68CA5BEED6644A1AA53B11 83654~|~1~|~1~|~01/STR~|~SCI SR 73 8.50 Slide Repair01/STR/OT/State~|~44 - Other~|~8A2EAF0D071989BE66F9306C8EE444C3BA42E88E 105532~|~1~|~1~|~01/NHS~|~NHS plan split (MAR-4-13.00-13.81)~|~05 - 4R Maintenance - Resurfacing~|~1FF4706C889B954777EB8F0BF8985CCFD17E17A0 105532~|~1~|~2~|~02/S<2~|~City of Marion plan split (MAR-4-13.81-17.21)~|~05 - 4R Maintenance - Resurfacing~|~0C5E8ABB7797138CD9795683058CD7EF3C1186E4 105532~|~1~|~3~|~03/STR~|~Rural plan split (MAR-4-17.21-20.49)~|~05 - 4R Maintenance - Resurfacing~|~853F824DE705A1E9563DB118B1964E03253EF163 93704~|~1~|~1~|~01/S>2~|~80/20 split between federal and local for the resurfacing of Chagrin Road using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~5C80D81EBFC02BE8B3B2FB00820A8A2D1BA47DCB 118523~|~1~|~2~|~02/SAE/EAT~|~Split for pedestrian related infrastructure that will be constructed as part of the project.~|~28 - Facilities for Pedestrians & Bicycles~|~9477E9DFF44B906E91D1BD8E1135F31448BB9CB2 118523~|~1~|~1~|~01/S5K/EAT~|~Reconstruction of North Maple Street from East High Street to Mechanic Street. Replacement of curb and storm sewer.~|~04 - Reconstruction - No Added Capacity~|~87D2C14B0D9F213D548754F4DA951E8BB8507D5B 118523~|~1~|~3~|~03/NFP~|~Plan split for 100% local utility work/relocation~|~43 - Utilities~|~06F1159BDD17BA0C87A29DC7F58CEF9F82981986 98233~|~1~|~1~|~01/IMS/ZANV~|~"01/IR/BR/ZANV" - plan split 01 for Mus-60G-0033~|~~|~23FF7EA3BB2D0DB748A726A7938FC7DEE543F29A 110934~|~1~|~1~|~01/S>2~|~Plan split for paving work~|~05 - 4R Maintenance - Resurfacing~|~6B462EDD1684A089BFB6EB4BE0DA4100691CDF11 116109~|~1~|~1~|~01/S>2~|~All work associated with this PO is for the scour repair of the WAR-48-1508 bridge size culvert. ~|~~|~8341A80B2E9EBF2D356B31C2D03E3A671098A578 98962~|~1~|~1~|~01/STR~|~Scioto FLAP project~|~05 - 4R Maintenance - Resurfacing~|~A7A90469D4821FC326BCDB959751D7F69AF4B1D8 108055~|~1~|~1~|~01/NHS~|~Consultant CE contracts~|~17 - Construction Engineering~|~788E166851B2BEE8B66CD08446450949AF04EE61 105716~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~041766791306BBCDB7DE4A9353691778C4EEEB01 113411~|~1~|~1~|~01/SAF~|~ 100% CEAO HSIP funding for upgrading guardrail on county roads~|~21 - Safety~|~44FA552628843B7BA645A2F5A36333577A2D30EC 123545~|~1~|~1~|~01/IMS~|~Plan split for work association with preventative maintenance required on multiple interstate bridges~|~47 - Bridge Preventive Maintenance~|~62357EFB72CCEECB0BDDA4418B67C279236DA0A1 113498~|~1~|~1~|~01/STR~|~Replacement of structure > 20' span.~|~10 - Bridge Replacement~|~2ED1444A25044EB8E7273620A902A4B74500829B 25622~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1811991~|~~|~A0A59011B0CDF60675F767997C0F2A2C58001258 116878~|~1~|~1~|~01/MPO/MASS~|~Resurfacing.~|~~|~B72F2F2D08B1A1669F3417EA57DDB1D63E1ED5ED 122593~|~1~|~1~|~01/ERD~|~Replace a failed retaining wall in Jackson Hill Park that is impacting the sidewalk and threatening the roadway. Project will also provide improvements to the existing structural stairs that connect Gage Street to Eleanore Place. Also repairs to a landslide along Coy Street.~|~66 - Resilience Improvement - Highway Project ~|~EB4A57712AA96159990BA47EE3D586957720EA83 99960~|~1~|~1~|~01/S<2~|~Replace the traffic signal hardware at SR 7 & SR 213 and at the US 22 ramps & SR 213 in Jefferson County. Install a left turn lane on the US 22 Ramp E approach at the SR 213 & US 22 Ramp E/F intersection.~|~04 - Reconstruction - No Added Capacity~|~3DBF8A19F6F09BA8BFAEEE3517315A7EB46552EE 99960~|~2~|~2~|~02/S<2~|~This plan split is for the installation of the traffic camera equipment.~|~04 - Reconstruction - No Added Capacity~|~B7745AA3C5EBF212BF535037C49A4BCD6AD14A08 117096~|~1~|~1~|~01/S5K~|~OVRDC funded resurfacing. ~|~05 - 4R Maintenance - Resurfacing~|~E4219DA2991DB2BE751DDD7EB3DC1B0F9D9463EC 117580~|~1~|~1~|~01/NFA~|~Bridge replacement project. GAL TR 342 0.04, SFN: 2736810. Funded 100% Federal.~|~10 - Bridge Replacement~|~F10E812C8866F91B711A80CAF59C331D78849BF6 94011~|~1~|~1~|~01/NFP~|~Add generator for district garage. 01/NFA/OT/State~|~44 - Other~|~195D890B53961E191873B5CDD2825F1E169596AE 114292~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8.~|~21 - Safety~|~EEB3DE6947F5A401D25C5BE40A06E6A88967E401 114292~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7. ~|~21 - Safety~|~690FA09B131B3EEAED45A10E8A19EBCF8E756337 114292~|~1~|~3~|~03/SAE~|~Add guardrail along the south side of US-50 in the curve near SLM 32.40-32.60.~|~21 - Safety~|~5A9B4D29EC60E24AD9A11A9DD38C2A3CCF1CD996 127080~|~1~|~1~|~01/NFP~|~Plan split for guardrail maintenance and repair at various locations in the district~|~21 - Safety~|~A251E545467542E1B1A19E6FB33F54AA972F2CA2 127080~|~1~|~2~|~02/NFP~|~Plan split for guardrail repair as directed by district~|~21 - Safety~|~41097AEF73367C147F672743652CB0C1F61E354A 97384~|~1~|~1~|~01/S<2/FIND~|~For work on all streets in this project other than Lima Avenue and W. Lima Street.~|~05 - 4R Maintenance - Resurfacing~|~462986B99F946ED7957AE7B9DF1FC901471634F2 97384~|~1~|~2~|~02/NHS/FIND~|~For work on Lima Avenue and W. Lima Street which are Principal Arterials and therefore on the NHS.~|~05 - 4R Maintenance - Resurfacing~|~CBA8C208D7A02D2881525BD2D9785CF3FCD37188 110114~|~1~|~1~|~01/STR~|~Landslide repair project. WAS 26 25.10.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B0B9D51F485F3B2E1C481B1E217F078B562A2D49 123018~|~1~|~1~|~01/NFP~|~Districtwide systematic lighting upgrades and maintenance.~|~21 - Safety~|~D912A48ED4913D42DB01270ACB57D31EDFB6D2A1 87659~|~1~|~1~|~01/IMS~|~SFN 8703574 WOO IR75 12.05 Intersect: Portage River North Br - Left SFN 8703604 WOO IR75 12.05 Intersect: Portage River North Br - Right~|~~|~E00D389E22921B5EDB4FE51B5B664303805266FA 108261~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER event. DSR# JEF-006.~|~~|~A324D23A6FB471921EAC78CD282715735A8040F9 103204~|~1~|~1~|~01/STR~|~Test pavement sections on VIN 50 0.07-3.00.~|~05 - 4R Maintenance - Resurfacing~|~452DAAA78D75BB56D8874D656E56A6AD6725A7C3 117422~|~1~|~1~|~01/NFA~|~Bridge Replacement project~|~10 - Bridge Replacement~|~537C5F4F6B7AB0EA91068CCD93A0637D0FBC683F 121518~|~1~|~1~|~01/SAF~|~Signal & lighting replacements~|~21 - Safety~|~DEF370C52972BA683E43508C6221D1156596FC39 97996~|~1~|~1~|~01/NHS/PATA~|~Resurfacing of SR 16 in Pataskala and minor bridge maintenance.~|~05 - 4R Maintenance - Resurfacing~|~A7F8007F51621B84513756B94F8247B47EDED704 97996~|~1~|~2~|~02/NHS~|~Resurfacing of Lic-SR 16 outside of city limits~|~05 - 4R Maintenance - Resurfacing~|~14B5DD247EF25FB70D54F3B2C8A5C8B73B27F09D 97996~|~1~|~4~|~04/SAF/PATA~|~Reconstruction of traffic signal at SR 16 (Broad Street) and Summit Road and access management improvements.~|~21 - Safety~|~2BC7E49D899DEFA26D3B3AFB6A21D254BECD8D20 97996~|~1~|~3~|~03/NHS/PATA~|~Repair and replacement of curb ramps in city of Pataskala~|~05 - 4R Maintenance - Resurfacing~|~345F7DA914B4FDAC55280AA46B388064A3667B75 92634~|~1~|~2~|~02/STR~|~STP Rural funding for MAR-95 signal work, SLM 18.48-18.86(Menard's intersection)02/STR/OT/~|~21 - Safety~|~0B33577AC4F49951DF633A49B5CE360BF87B9FA7 92634~|~1~|~1~|~01/S<2~|~STP small urban funding for MAR-95 signal work, SLM 17.05-18.48(From Marion Plaza to Tri-Rivers/Blevins/Success)01/S<2/OT/~|~21 - Safety~|~3231B82B96BA618251AC196C71689AD79BEB8377 98720~|~1~|~1~|~01/BRF~|~Bridge replacement on TR 72-2.91.~|~10 - Bridge Replacement~|~79712C501BACE9F16EF9EC90B7EBA3DB088BF84C 101349~|~1~|~1~|~01/STR~|~bridge rehab.~|~17 - Construction Engineering~|~EBB752DB276D62565A1A489171995B2E3DE31BF1 94110~|~1~|~1~|~01/S<2~|~Resurfacing ATB SR 531 from 6.86 to 7.54 and 10.27 to 18.69.~|~05 - 4R Maintenance - Resurfacing~|~DCBEBD2B3CC7415495815FE68239F1A798D1E30D 94110~|~1~|~2~|~02/S<2~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~7C574C9C448553EA6EDD625A072A8F7DDF1AA48E 100459~|~1~|~1~|~01/NHS~|~Construct a bike lane on Monument Avenue and complete the bike lane on St. Clair Street from Monument Avenue to the alley north of East First Street.~|~28 - Facilities for Pedestrians & Bicycles~|~E2F62A134FDB637E780820242BBECEB10E463E2B 93260~|~1~|~1~|~01/BRO~|~Overlay bridge deck with latex modified concrete, and raise superstructure to meet required vertical clearance on SFN 5706939 MOT IR 75 0776 East River Road over Interstate 75..~|~13 - Bridge Rehabilitation~|~1CA05940F076FE5CBADC3A731D628F3A7940E867 97241~|~1~|~1~|~01/STR~|~Replace deficient structure with new structure. Investigate use of pre-cast structure.~|~13 - Bridge Rehabilitation~|~4D4C4697384612D6D27C87C47B14CBAFA4F3F958 87098~|~2~|~3~|~03/SAF~|~Widen SR-747 to provide a 450' NB right turn lane, restripe Union Centre Boulevard to provide a 550' EB right turn lane, and replace the traffic signal at SR-747 & Union Centre Boulevard while providing right turn overlaps, providing new signal heads with backplates, and counting and retiming the traffic signal.~|~21 - Safety~|~5ADF21D991B21087F9A6C1D6847A3CC1BDCA11B7 87098~|~1~|~2~|~02/NHS~|~Plan split includes all approach, approach slab, and bridge work associated with the following structures: HAM-126-0865L/R, HAM-126-1149L/R and HAM-126-1279 L/R.~|~13 - Bridge Rehabilitation~|~9FB2F689E6DD958A930FCF71B7AC8FBDB26D87FA 87098~|~1~|~1~|~01/S>2~|~Resurfacing a portion of SR 747 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A8B54F4FF338C3344588CCF0F2BC9EEAFD015AC2 112284~|~1~|~1~|~01/SAF~|~Installation of single mode fiber optic cable at two locations along Interstate I-275 in Hamilton and Clermont Counties. The work will include adding cable on I-275 from the I-74 interchange, east through the US 27 interchange in Hamilton County.The installation of single mode fiber optic cable and cameras from Montgomery Road (22/3) to SR 28~|~21 - Safety~|~5046FACEB234220593A0D1A3BB90159D0C4FCFF8 112284~|~1~|~2~|~02/SAF~|~The installation of singe mode fiber optic cable at the i-275 and SR interchange in Clermont County extending south into Hamilton County and terminating at US 52 Interchange.~|~21 - Safety~|~8DF1BB6A163D37402B6823A2D70CB693084C49A7 121133~|~1~|~1~|~01/IMS~|~D8 mowing locations~|~44 - Other~|~45B638B0DCF3755D68E796BAA4517CC23D09D5EC 104917~|~1~|~1~|~01/NFA~|~North Royalton Schools school bus replacement project~|~44 - Other~|~3B92ED304D837D3A11E635A5B90E1FF1931CC206 105193~|~1~|~1~|~01/STR~|~Resurfacing of SR 93 and SR 651.~|~05 - 4R Maintenance - Resurfacing~|~F06E6E98F953B02B88D656EB1AA57EFEAD82F8D8 75625~|~1~|~2~|~02/S>2~|~STP Urban Bridges for the following structures: BUT-127-1093 and WAR-22-0357.~|~13 - Bridge Rehabilitation~|~1DB0D345D21876F6BCB5FE88619AE1940EA02380 75625~|~1~|~5~|~05/IMS~|~Interstate Bridges including the foolwoing: 91,000.~|~~|~B5E96A7C36DA5A573F01FE9FBCDC2C7B8A2D0A5E 75625~|~1~|~1~|~01/STR~|~STP Rural bridges including the following: CLE-52-0652, WAR-350-0873 and PRE-127-0376.~|~13 - Bridge Rehabilitation~|~CBF46EC3A2ECFEA9B8F2D5DBA8C904732982EF55 75625~|~1~|~3~|~03/NHS~|~NHS Bridges including the following: BUT-4-1480L and BUT-4-1488R.~|~13 - Bridge Rehabilitation~|~CE81A7E00E2FE4EF3C5404B5DF3F2AF5E523468E 75625~|~1~|~4~|~04/BRO~|~Federal Bridge Fund eligible bridges including the following: BUT-73-1682, WAR-48-2205, and WAR-48-1508.~|~13 - Bridge Rehabilitation~|~F5A87488C6A83B01EE4E1680034FE3193E6D972B 95752~|~1~|~1~|~01/NHS~|~LUC-US20 from SLM 7.98 to SLM 10.65~|~05 - 4R Maintenance - Resurfacing~|~86018ADE2A8F9530D699B45270FC8ED56BC27F36 124450~|~1~|~1~|~01/NFP~|~Created for ODOT TID Funding ~|~44 - Other~|~E9A415C4CD776A11CCE9C1C42786E59179973984 100768~|~1~|~1~|~01/NFP~|~Auxiliary pavement marking on various routes~|~44 - Other~|~E19AFCC67A4B110A7EC3DA331C333B9700A01DFE 110890~|~1~|~1~|~01/MPO~|~Replacement of existing pedestrian bridge including installation of an additional pier.~|~28 - Facilities for Pedestrians & Bicycles~|~EF2E8BA4391D7F135CD068A79060218906FB0FA8 106820~|~1~|~1~|~01/BRO~|~Rehabilitate three bridges (CAR-39-0970, CAR-542-0934 & CAR-542-1275) by replacing deck edges and railing.~|~13 - Bridge Rehabilitation~|~19540D412B5A014A76336A7A89F8AABF657E513D 101808~|~1~|~1~|~01/STR~|~ADA SR 73 10.38-13.10~|~04 - Reconstruction - No Added Capacity~|~37A14A6A56F285E4CCEF77A1633D3497423AE28A 101808~|~1~|~2~|~02/SAF~|~Change order to add center-line rumble stripes.~|~~|~0DF522B9B328BC22FB4D9D0D5DA8A3514678BAFD 102488~|~1~|~1~|~01/NHS~|~Resurfacing of COL-7 from SR 267 to CR 425 and from SR 46 to Columbiana SCL~|~05 - 4R Maintenance - Resurfacing~|~B2C6F0A115F3396BC85338EB4D843A66334F3CDB 102488~|~1~|~2~|~02/STR~|~Resurfacing of COL-7 from CR 425 to SR 46~|~05 - 4R Maintenance - Resurfacing~|~E0B96E79DE7E46F3B0D6BE6B5768C7CBD0DC0CA9 125604~|~1~|~1~|~01/STR~|~Resurfacing SR 557~|~05 - 4R Maintenance - Resurfacing~|~8330450F483FB9F77B1A1A833361EE7B5A5EE951 95233~|~1~|~1~|~01/S>2/PATA~|~MORPC/City of Pataskala project - 4TA7 (80% Federal) / 4BG7 (20% Local) funding - For the reconstruction of Mink Street.~|~04 - Reconstruction - No Added Capacity~|~9484E4BA2B9CD68D3E7FC754A053E4134DEE8B1F 120949~|~1~|~1~|~01/CMQ/MOGA~|~Install new signal at SR 532 and Albrecht Ave in the Village of Mogadore.~|~21 - Safety~|~653551CEABD4834CFFDC774711FF94EB889EEFE3 111184~|~1~|~3~|~03/S5K~|~Bridge replacement.~|~10 - Bridge Replacement~|~D683706B703D8DFD5C37411476AC8204EEC4F6C2 111184~|~1~|~1~|~01/STR~|~Bridge replacements 10' to 20' bridges.~|~04 - Reconstruction - No Added Capacity~|~FDBA2C8454EDB1965E946CD379A4917AA91EEAF2 111184~|~1~|~2~|~02/STR~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~A61BCF7A0BE8682F2D78A274D10C849CA67F9DF0 105594~|~1~|~2~|~02/NHS~|~NHS Bridges (HUR US 0224 15.82, RIC SR 0013 S 16.32, RIC SR 0013 00.08).~|~13 - Bridge Rehabilitation~|~9409B7AC3DB1BBBAB7E3F69B6F5C9882EE5060D9 105594~|~1~|~1~|~01/IMS~|~MED IR 0071 08.10~|~13 - Bridge Rehabilitation~|~0AA50C896BA089AB249E8FC23085129488AE3FFC 112959~|~1~|~1~|~01/STR~|~Overlay on ADA 41.~|~05 - 4R Maintenance - Resurfacing~|~DAC210DB2F2DC10C23D8EE7125DFC097592D7494 98029~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CY 2021. Funded 100% state.~|~21 - Safety~|~C5DD09E8530092E47EE6B14D281B79FB781FF638 99083~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for week control on US 33 on 4 lane and 2 lane - LOG~|~44 - Other~|~CC4428988E0F92D40A7D4E2C20A63B57CBC671EF 104042~|~1~|~1~|~01/ERD~|~Construction of a green, complete streets corridor on South Main Street between State Street and Mill Street in the City of Akron, Summit County, Ohio. Project would include roadway and sidewalk replacement, the addition of on-street parking and dedicated bike lanes, a roundabout, traffic improvements, way-finding signage and green infrastructure.~|~04 - Reconstruction - No Added Capacity~|~B0462A53A825B7F7689CB0828EF4A785D6A7C035 104042~|~1~|~2~|~02/BRO/AKRN~|~Replacement of State Street structure SFN#7760361 in the City of Akron, Summit County, Ohio.~|~10 - Bridge Replacement~|~FB24A96488669AF4A76DC1CA77B4947662CD586E 116310~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG TR 231 0.927, SFN 5337542. CEAO funds.~|~10 - Bridge Replacement~|~E29DCFBB91945D18EDB4F3771E28BF0A83B5AE8B 89344~|~1~|~2~|~02/NFP/SOME~|~"02/NFP/OT/SOME" - Village of Somerset Local Requests - 4BG7 (100% Local) - No CAP - 1) Deciduous Plants; 2) Parking Meters; 3) Sandstone Seat Wall~|~44 - Other~|~1B08A28093E1717B2E253446CC383115FF02FF6D 89344~|~1~|~1~|~01/ENH/SOME~|~"01/ENH/OT/SOME" Village of Somerset Enhancement Project - 4B37 (80% Federal) / 4BG7 (20% Local) - CAP Federal Enhancement Max of $828,000.00 - Base Plan: Per-US 22-5.99 to 6.24 (West Main Street); Per-SR 13-27.59 to 27.66 (Columbus Street);~|~44 - Other~|~2FAA8DC25A121F4D42D0B71466EAD66105244360 118879~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SLM 13.23 to SLM 13.61~|~05 - 4R Maintenance - Resurfacing~|~6DB82D772B554AAF47F8589D485EA6220319CC36 118879~|~1~|~2~|~02/NFA~|~Resurfacing SR 147 from SLM 13.61 to SR 9~|~05 - 4R Maintenance - Resurfacing~|~A1B04C9789F0EA2B821ABC67A763D36901C556E8 121453~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0FD5B16FAB102DC36D75D172F0BB852018FDE560 121453~|~1~|~2~|~02/S>2/NILE~|~Resurfacing, urban paving in Niles.~|~05 - 4R Maintenance - Resurfacing~|~938315F47F6F9AB325F1A8D9144FCB27F35BDA7C 113465~|~1~|~1~|~01/IMS~|~Replace approach slabs and decks on eight bridges on FAY/MAD IR 71~|~13 - Bridge Rehabilitation~|~330595999C822A23D623E70565C9651CB7CB3D3B 125985~|~1~|~1~|~01/STR~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~C06304B2832F94852070B3B4ABD4AB5DEB7BDB26 101651~|~1~|~1~|~01/S>2~|~Culvert Repair: MED-3-21.78~|~44 - Other~|~3B44D15632D2B9AF7E01DEA6241E89FF346CDE2E 101651~|~1~|~2~|~02/STR~|~Culvert Repair: MED-3-13.67~|~44 - Other~|~EBD33A66CC9FDB5E21FF248FF23F7A4311120A67 121705~|~1~|~2~|~02/SAF~|~Traffic Signals - Capital~|~21 - Safety~|~86FBF224C26055BE37F3CE50AFD728C681EE0782 121705~|~1~|~1~|~01/SAF~|~Traffic Signals - Maintenance~|~21 - Safety~|~1B0D37A4686DC8C4F4E77395EAB85C493E622B7B 121705~|~1~|~3~|~03/SAE~|~Work includes supplemental signal heads, stop bar detection, advanced radar detection, installation of flashing beacons. Also converting school flashers to solar-powered.~|~21 - Safety~|~AAA7FBB1DF92913357AED58CA5F06532A9396FA5 95393~|~1~|~1~|~01/S>2~|~Rehab or replace bridge~|~10 - Bridge Replacement~|~9AF136E6C0AEC22055731D29F3D7A9F4E67C64ED 95393~|~1~|~2~|~02/S>2~|~Bridge Replacement~|~10 - Bridge Replacement~|~B81C8B962A1A87422F400D88D6A83E7148B4324E 98480~|~1~|~2~|~02/STR~|~MED-94-5.44-10.37 Resurfacing (Rural Section)~|~05 - 4R Maintenance - Resurfacing~|~5F034AFFFD79A6318F81BA63CA4EA99A74A71613 98480~|~1~|~1~|~01/S<2~|~MED-94-5.31-5.44 Resurfacing (Urbanized Area)~|~05 - 4R Maintenance - Resurfacing~|~C978319528D4312FF9F85E3C993943BB066C766C 91569~|~1~|~1~|~01/BRO~|~Replace existing box-beam bridge (JEF-150-1254, SFN 4102401) with steel beam or prestressed concrete I-beam bridge.~|~10 - Bridge Replacement~|~60CF20FA70E0E3BC0F45C2886595042807225858 109611~|~1~|~1~|~01/NHS~|~Emergency column repair and removal of steel deck grating and debris from overhead utility structure COL-30-3564 (SFN 1502352).~|~13 - Bridge Rehabilitation~|~0E5A986CD75AC0A54F7BF45A2B8ACFB780F0FAE4 113038~|~1~|~3~|~03/STR~|~Plan split for the portion of US 68 outside of the Kenton Urban Area. From the Logan County line to the Kenton Urban Area boundary at 6.97. All funds will be provided by the District. No local funds.~|~17 - Construction Engineering~|~21735AE5B4EFD7DF48123B8127C78ACE8C97BFB7 113038~|~1~|~1~|~01/S5K~|~Plan split for portion of US 68 inside the Kenton urbanized area but outside of the City of Kenton. On both sides of US 68 from where US 68 enters the Kenton Urban Area at 6.97 until US 68 enters the City of Kenton on the left side at CR 135 at 7.10, then on the right side until US 68 leaves the City of Kenton on the left side at 7.53, then on both sides of the road until US 68 re-enters the City of Kenton on the left side at 8.78 then on the right side until when the project ends where US 68 enters the City of Kenton on the right side at 8.84. All funds will be provided by the District. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~A796E2BA76FC6FA8FA1AF165321844B1E1FA316B 113038~|~1~|~2~|~02/S5K/KENT~|~Plan split for portion of US 68 inside the City of Kenton. On the left side of US 68 from where US 68 enters the City of Kenton on the left side at at CR 135 at 7.10 until US 68 leave the City of Kenton on the left side at 7.53. On the left side of US 68 from where US 68 re-enters the City of Kenton on the left side at 8.78 until the project ends where US 68 enters the City of Kenton on the right side at 8.84. The 80% federal funds will be provided by the District, The 20% match will be provided by the City of Kenton.~|~17 - Construction Engineering~|~5876E94F425D247245CF33CB0F40334AD4CE75F7 120881~|~1~|~1~|~01/BRF~|~All work in the project to replace the bridge ~|~10 - Bridge Replacement~|~2E2511185A1BF3D181BB6DC93F361CE5B5A82D4C 83828~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 339 0.00-9.12, NOB 574 0.00-3.68, MRG 339 0.00-0.675 and GUE 574 0.00-0.65.~|~05 - 4R Maintenance - Resurfacing~|~B0CE42652963EB04FECF539E0D062B8675031767 105886~|~1~|~1~|~01/NHS~|~Plan split for slide repair work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2BA989E06101AABC39CC39EFB67D836E7C228611 124145~|~1~|~1~|~01/SAF~|~Upgrade existing span wire signal to mast arms with pedestrian signal heads and pushbuttons. Video detection and emergency vehicle preemption to be added to the new signal. Signing and pavement marking upgrades at approaches and curb ramp upgrades as necessary to meet current ADA standards. MPO funding used.~|~21 - Safety~|~D3EB5A4173831599F9A56B6FB097D9D9F85E8D2F 125491~|~1~|~1~|~01/STR~|~Bridge replacement project. WAS 676 12.16, SFN 8405042.~|~10 - Bridge Replacement~|~98E5DA35FD9A35FEF70B7F3871B3327F349C928D 93027~|~1~|~1~|~01/SAF~|~Columbus sponsored, safety funded projectRealign NB & SB LTL within median at Northwest Blvd/Fifth Ave and Northwest Blvd/King Ave~|~21 - Safety~|~2B08A525E74EC967CC4E8293F34C408755E000E9 102983~|~1~|~1~|~01/STR~|~Micro on rural routes: MOT SR 725 SLM 0.00 to 3.78~|~05 - 4R Maintenance - Resurfacing~|~F944091BD3354D3010C61EC9838CCA5A17C4AF04 102983~|~1~|~2~|~02/S>2~|~Micro on Lg Urban routes: MOT SR 725 SLM 3.78 to 4.84~|~05 - 4R Maintenance - Resurfacing~|~F1FC5AFAAF179CDECC0109FC14D43C1C53BB8443 114926~|~1~|~1~|~01/NHS~|~All work is in this plan split using district allocations from SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~A5CC1A6CFA648DB9C19BDEAA9C9BC40B82137B1E 122845~|~1~|~1~|~01/S50~|~Resurfacing TCC Federal Surface Transportation~|~05 - 4R Maintenance - Resurfacing~|~A135A67D772F55F4C0178FF6097B051386CE035F 104922~|~1~|~1~|~01/NFA~|~National Express school bus replacement project~|~44 - Other~|~06CB78068BA0738CA3D8273DE24C8853763A6296 109023~|~1~|~1~|~01/STR~|~Landslide repair project on VIN 160 16.64. 100% State (4BE7) funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~92139C9E469997776F60710865D59CFDB7F29C50 100312~|~1~|~1~|~01/NHS~|~Replacement of HAS-151-21.12 culvert.~|~04 - Reconstruction - No Added Capacity~|~B2A9B1CBB9896FFC2D6954D69CD0D6934B1AC3AE 100312~|~1~|~2~|~02/STR~|~Replacement of culvert HAS-151-25.34.~|~04 - Reconstruction - No Added Capacity~|~3E50609615731D5EBCEF0272A814AAB79B9FD408 119356~|~1~|~1~|~01/NHS~|~Plan split for project to replace the bridge, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. ~|~10 - Bridge Replacement~|~47BCAA3747FE31D04285042FC5030BFD3B47D924 92900~|~1~|~1~|~01/S<2~|~BRO SR41 1.93 Safety On SR41, begin just South of the intersection of SR41/763, head north and terminate at Slickaway Road. Project Description: It is proposed to improve the alignment of SR41 with a spiral curve, realign the SR763 intersection to improve its width, and remove the intersection of Slickaway Road. Urban SR763 0.00 - 0.21 & SR41 1.88 - 2.07~|~21 - Safety~|~F349B8133309571FCEE316EACE99A2C853BC4F0F 92900~|~1~|~2~|~02/STR~|~BRO SR41 1.93 Safety On SR41, begin just South of the intersection of SR41/763, head north and terminate at Slickaway Road. Project Description: It is proposed to improve the alignment of SR41 with a spiral curve, realign the SR763 intersection to improve its width, and remove the intersection of Slickaway Road. Rural SR41 2.07 - 2.22 & SR763 0.21 - 0.22~|~21 - Safety~|~EE830DEAB98684F42672059B1F2DB856AE2C8ABB 101339~|~1~|~1~|~01/NHS~|~Bridge rehab.~|~17 - Construction Engineering~|~7F0C0F89945ED42A2745F6DD556774D203D4F089 91933~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint. funds for 2year mowing contract.~|~21 - Safety~|~33ACF543B3FAFBE636F0978C2AA4F74CF03DA8BE 127123~|~1~|~1~|~01/ENH~|~Replacement of sidewalk on Main St. from south of Grove St. to Clark St.; High St. from Main St. to Cherry St.; Cherry Street from High St. to Clark St.~|~28 - Facilities for Pedestrians & Bicycles~|~A24854F851291AB2BE4F4AB2030DCAA8D8013B67 94019~|~1~|~1~|~01/BRF~|~SFN 2430681 - CR34 (Cook-Yankeetown Road) over Deer Creek.~|~13 - Bridge Rehabilitation~|~D7CC42F8008FA834E10E0F8F5ED5041ACB1C61DC 121886~|~1~|~2~|~02/STR~|~All sidewalk work along Federal Aid routes, including SR 114 and SR 115.~|~28 - Facilities for Pedestrians & Bicycles~|~FDDDC4821E06A5257C37FBD50A7C1B35FEF97BCD 121886~|~1~|~1~|~01/NFA~|~All sidewalk work along local routes and through the village that are not on the federal aid system.~|~28 - Facilities for Pedestrians & Bicycles~|~65D14E61F716981415D9D35AE46FA6E482A658BF 125469~|~1~|~1~|~01/SAF~|~Install single lane roundabout.~|~21 - Safety~|~024156090CB3B88069B2ED8F0DEE41D9A48D8510 95824~|~1~|~1~|~01/NHS~|~From SLM 9.98 to 13.35~|~05 - 4R Maintenance - Resurfacing~|~D64B89F660DE159550AB7F74A452BAE38D147F1F 116665~|~1~|~1~|~01/NHS~|~All work outside the Defiance Urban Area.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CD20B5258F48C027F867D3AD73E19D4F5CFA379C 101849~|~1~|~1~|~01/NHS~|~This project will replace deteriorated bridge decks, paint superstructures, investigate semi-integral abutment conversions and other miscellaneous patching of subsructure units.~|~13 - Bridge Rehabilitation~|~898DCA1E2B058CB30C71BE530F146C5D69B07BB7 101849~|~1~|~2~|~02/NHS~|~Guardrail and pavement repair for damage during construction~|~13 - Bridge Rehabilitation~|~1F61CFAD3CC05BDF317BA72580B0A44E6B249FCD 110476~|~1~|~1~|~01/SAF~|~Upgrade signal equipment, add pedestrian improvements and curb extensions~|~21 - Safety~|~6A08B03EB372782A4BE24A222D8895458394D932 105452~|~1~|~1~|~01/STR~|~Major Rehab of pavement on CRA-96~|~04 - Reconstruction - No Added Capacity~|~F042C5A0976F51361A63AA32FB0E4F7BDDD32B2E 114271~|~1~|~1~|~01/IMS~|~Mowing contract~|~99 - State Preventative Maintenance~|~5179094FEAA4A3B5F727481A706CCC2E2C69EE5D 100688~|~1~|~1~|~01/STR~|~FRA-71-20.75 & 23.46 L/R; MRW-71-17.64 L/R & 18.88 L/R approach slab and back wall repair~|~13 - Bridge Rehabilitation~|~35B1A116F715871F15BF2BDDD7F6DE221BF157ED 98767~|~1~|~2~|~02/ENH~|~Addition of bike lanes on SR-4 (Springfield Pike) in the City of Wyoming.~|~28 - Facilities for Pedestrians & Bicycles~|~0EE73CAF699B2EDB748B1F5A36E43AC04CBB9480 98767~|~1~|~1~|~01/S<2~|~Improvements to SR-4 (Springfield Pike) in the City of Wyoming including pavement rehabilitation, curb replacement, upgrades to storm sewer system, traffic signal replacement/upgrades, and implementation of "road diet" measures.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~88B43E41AC84B1C5A419E67B6920456E76B47056 98767~|~1~|~3~|~03/NFP~|~Plan split to cover the signalized intersection of SR-4 with West Charlotte, which did not meet warrants and is being paid 100% locally.~|~21 - Safety~|~21B209A42CB60724DC2586E8DC014BD4DFE66806 99565~|~1~|~2~|~02/NFP~|~For items NOT eligible for Urban Paving.~|~~|~50E91768084030AA7A79487E2FD1944C761A717B 99565~|~1~|~1~|~01/S>2~|~WOO-65 from 23.57 to 24.53 Urban Pav eligibel items~|~~|~52203AD347FD9AAA2679E7328664E61D6D0355D2 97716~|~1~|~1~|~01/NFP~|~Adding split do to funding~|~04 - Reconstruction - No Added Capacity~|~849D0BA6B262C73D72459D996B895780E2A45325 112484~|~1~|~3~|~03/NHS~|~Full Depth Pavement Repairs using STBG funds~|~05 - 4R Maintenance - Resurfacing~|~D4FE582A0E054EA028585A0995874CD5532C3688 112484~|~1~|~1~|~01/NHS~|~AC overlay - NHS~|~05 - 4R Maintenance - Resurfacing~|~9241C6F7E3C1A44CC26F5E9F9978B7237B8E6432 112484~|~1~|~2~|~02/STR~|~AC overlay - STP Rural~|~05 - 4R Maintenance - Resurfacing~|~12FF7CA4FF37E97CAE3E29FE7CC082F51C7D1AA4 118775~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~54815E7884D178A4A65D0CF9626F38B9DD4F2D6C 118775~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~E06BB7888F368D7E2715B7AE0853BC759F30B1D1 103699~|~1~|~1~|~01/SAF~|~Work eligible for safety funding~|~17 - Construction Engineering~|~AD0C9954C62EAFB289FBC61B81A0263A0AD1D705 118401~|~1~|~1~|~01/NFA~|~Bridge maintenance project. ~|~47 - Bridge Preventive Maintenance~|~3E42E1B7A75E3C5BEC87B145B872A71110F80D6D 98031~|~1~|~1~|~01/STR~|~Resurfacing along STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~92FC99A37CA94CD86C95C1CB4362F5E1DDC74437 98031~|~1~|~3~|~03/NHS~|~Resurfacing along NHS routes~|~05 - 4R Maintenance - Resurfacing~|~B3D269D0A3EEEA17E6CF79C79E88B56DC8BB890B 98031~|~1~|~2~|~02/S50~|~Resurfacing along STP Urban locations~|~05 - 4R Maintenance - Resurfacing~|~4AEF8B21CE0591CB74C678D2003F8CACBFEFB030 125843~|~1~|~1~|~01/IMS~|~Interstate Mowing in D8~|~44 - Other~|~E59B871C17336C66C50271FD6441D01334C34451 121998~|~1~|~1~|~01/NFA~|~Full depth roadway reconstruction, curb and gutter replacement, curb ramp and crosswalk improvements and driveway approach, traffic signing, pavement markings, erosion control, landscaping, lighting, maintenance of traffic and other roadway related work.~|~04 - Reconstruction - No Added Capacity~|~8CACF92A83793BC1758C2FD58C51051E42F405BD 109382~|~1~|~1~|~01/NFP~|~ODNR slip repair project in Tar Hollow State Park~|~04 - Reconstruction - No Added Capacity~|~83A7F1A35AAFF211538D947EBE9F94FAA4CCE284 121730~|~1~|~1~|~01/S>2/TRCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~09D8FEE2385AC3291C1BC4A33093481DE213ABFF 81699~|~1~|~1~|~01/BRO~|~Remove the existing deck on COL-164-1431 (SFN 1504053) and replace with new reinforced concrete deck. Repair substructure units (Piers & abutments) and paint structural steel.~|~13 - Bridge Rehabilitation~|~9C0E1AE86057E6C860158DFC0D60011F5B1C04D9 105920~|~1~|~1~|~01/BRF/LCEO~|~CEAO LBR program 4B87 (80% Federal) / LNTP (20% Local [15% CB and 5% LNTP] - See CAP Comments - Replacement of deficient bridge ((4536584) on Twp Rd 180 over Lost Run~|~10 - Bridge Replacement~|~9765E6A4A04A6EED262E0DB438A0D103EBD0CE18 121488~|~1~|~2~|~02/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~98C5EC8D0948FAFFB2EC4ADAEB0ED17EC247AFF1 121488~|~1~|~1~|~01/NHS~|~NHS Plan Split.~|~05 - 4R Maintenance - Resurfacing~|~1BC4200DFC24C2F631FE2BDC28A6D8A4DE93004C 93694~|~1~|~1~|~01/IMS~|~Design Build Noise Walls 50/50-ODOT/Turnpike~|~44 - Other~|~A22450F718FA760FFBFEEA01E64BBFECB912EE6B 105053~|~1~|~1~|~01/STR~|~Epoxy overlay on PIC-762-10.18~|~13 - Bridge Rehabilitation~|~BC031752611680DD11E57D0A975E2B50FF4CFA9B 97482~|~1~|~1~|~01/STR~|~Culvert replacements of CFN 670140620 POR-14-25.52, and CFN TBD POR-225-7.19.~|~04 - Reconstruction - No Added Capacity~|~CA5F0031D2C62BB61CCD75327901AC60192A9A5F 97482~|~1~|~2~|~02/STR~|~Replacing culvert CFN 672250130 POR-225-7.42 with a bridge (SFN 6704205)~|~10 - Bridge Replacement~|~5C81B0E84298AE142D04B9F432E66C995A0548D2 100365~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~6ECA496DC5A7FF5151EE2B611E2F92439F2D278C 93853~|~1~|~2~|~02/NFA~|~Sanitary Sewer Construction~|~04 - Reconstruction - No Added Capacity~|~612D4E071E06E6962F82915C39FADAB4CDF7C397 93853~|~1~|~1~|~01/S<2~|~Widening the roadway, installation of storm sewer, curb, curb ramps, and sidewalk. Sanitary sewer laterals will be upgraded as well.~|~04 - Reconstruction - No Added Capacity~|~772EF0BAD57E2879B7A861F928BA19396A3ACDF8 95816~|~1~|~2~|~02/NFP~|~non eligible urban paving items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6B62C8680881A5AFDDE19CAD686E75FB0497ECBC 95816~|~1~|~1~|~01/NHS~|~on SR-25 from SLM 10.17 to SLM 11.27 on SR-25D from SLM 0.00 to SLM 0.52 Only eligible urban paving items from face to face of curbs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9EDCDE73A69505BDF2AB9B4BBE78E9EC96489E22 104407~|~1~|~1~|~01/SAF~|~This plan split includes all work associated with widening southbound I-275 to provide a two lane exit to SR-32.~|~21 - Safety~|~D5C2F20C863135C69095113841F1C24B7BBA0930 104407~|~1~|~2~|~02/NHS~|~This plan split covers all work associated with adding ITS facilities along IR-275 and SR-32. This work consists of adding a Dynamic Message Sign (DMS) on southbound IR-275 approaching SR-32, adding a DMS on westbound SR-32 approaching IR-275, and potentially adding cameras to IR-275 near 5 Mile.~|~44 - Other~|~AFBFDDC1B7F49B5FD0EE84CFAD918D9A1635D249 104407~|~1~|~3~|~03/SAF~|~Temp barrier wall.~|~~|~5C0286178E7B2A60C34946C0CE704AB1F69AAF48 123685~|~1~|~1~|~01/IMS~|~plan split for interstate locations~|~47 - Bridge Preventive Maintenance~|~B907F3E96D188F76B4E42F5FB8645F84F64B958F 92625~|~1~|~1~|~01/S>2~|~Pavement and planing and resurfacing with asphalt on US 36 SLM 16.25 to 17.10 & 17.10 to 17.22~|~05 - 4R Maintenance - Resurfacing~|~F7294AD19EEC4BF26C937C34057620C0B767D9FA 92625~|~1~|~2~|~02/STR~|~Resurfacing of the existing roadway with asphalt concrete on US 36 SLM 17.22 to 17.23~|~05 - 4R Maintenance - Resurfacing~|~D83F879039EA79EEAEFB4615AD57A6ACA4944B51 92625~|~1~|~3~|~03/NHS~|~Pavement planning and resurfacing with asphalt on SR 29 SLM 21.17 to 21.75.~|~05 - 4R Maintenance - Resurfacing~|~21BFCB3225F5AE1ABA1BB2ECEB57F5C09446198A 93437~|~1~|~1~|~01/CMQ~|~Signal coordination through central based system. Includes underground fiber optic cable, new controller hardware, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. East Exchange Street from Fountain Street to Main Street, in the City of Akron.~|~~|~7030622C164FD460C73FE89424B4BC4E891DD49E 115152~|~1~|~1~|~01/IMS~|~Split for the slope stabilization work along IR-90 EB~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D8F2D2A0C0EED84CFB9ACC70DDE66F4D18BCF727 104251~|~1~|~1~|~01/STR~|~Chip Seal: CRA-98-9.83-19.20 / RIC-96-6.46-11.99~|~05 - 4R Maintenance - Resurfacing~|~BB40D07B69FDC1FED43ACCBF999D33C41BB6CFA4 104251~|~1~|~2~|~02/S<2~|~Chip Seal: RIC-96-5.13-6.46~|~05 - 4R Maintenance - Resurfacing~|~B4D4DB698E6848B4A1DE99B54AD69CB31DF8A145 123821~|~1~|~1~|~01/NHS~|~Sign Replacement~|~99 - State Preventative Maintenance~|~AAFE1E469B60915126408486CFDA5FB58ACD9921 107248~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~818E38FD8D1BCEA8B736AEAA03BD2B125DD57464 107248~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~0773369E1645F2D5460EEF228F82EEEDA96E5070 107248~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~68A5983F941A1365E84C6DD0D4BE6AD80A7B284C 114812~|~1~|~1~|~01/S<2~|~MAD-SR665-1.17-3.285~|~05 - 4R Maintenance - Resurfacing~|~2DAFBA5EAFED8C1F1459836A148AC9270228D039 114812~|~2~|~2~|~02/STR~|~MAD-SR56-8.462-23.010, MAD-SR142-11.214-13.050, and MAD-SR665-3.285-3.35~|~05 - 4R Maintenance - Resurfacing~|~124605476514D193E4497B5C67B48AEB07985C38 96435~|~1~|~1~|~01/S<2~|~Overlay bridge deck with LMC using hydrodemolition, paint the structural steel and replace abutment bearings, patch and seal concrete along with various other work on SFN 5501504.~|~13 - Bridge Rehabilitation~|~52774AEB679B49926779FEDE02E05CE03AEE4EC1 96435~|~1~|~2~|~02/S<2~|~MIA SR 55 SLM 11.78 to SLM 12.06 - milling, paving and pavement marking within the City of Troy (Urban Paving) between Water St and Stauton Rd.~|~05 - 4R Maintenance - Resurfacing~|~C8134FB1DFC041E8566811C468DB4693ACB7D382 117117~|~1~|~1~|~01/SAF/GCEO~|~Guernsey County Engineer's Safety Funds to - 4HJ7 (Federal 90%) / LNTP (Local 10% - See CAP Comment - Project to address various safety issues by shoulder widening along various county roadways.~|~21 - Safety~|~DABFD3BCAD31D6AB4BBA6F46E07F86446796D699 89360~|~1~|~1~|~01/ENH~|~Bikeway~|~28 - Facilities for Pedestrians & Bicycles~|~1AB4669DDA5E1D0F6602827CEB0B5B17D6AC216E 89360~|~1~|~2~|~02/ENH~|~100% Local items.~|~28 - Facilities for Pedestrians & Bicycles~|~B0ECDB1ED3CE606B341EB3AD5BE3763527D15449 124903~|~1~|~1~|~01/IMS~|~Installation of 80-foot PTZ cameras throughout District 5.~|~21 - Safety~|~EAAE73B837A5250A6FA69FB5F6545454A5E67903 122279~|~1~|~1~|~01/SAF~|~Plan split for the construction of sidewalk, curb ramps and drive approaches eligible for safety funding.~|~28 - Facilities for Pedestrians & Bicycles~|~F58E3CF6FDE69F59048B1E66A086EF5062A89561 116097~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in ATB, MAH and TRU Counties.~|~05 - 4R Maintenance - Resurfacing~|~82E5EB853470651C01D809DC2961E6236E84133D 127021~|~1~|~1~|~01/STR~|~Landslide repair using a drilled shaft wall. MRG 60 12.96. Funded 100% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~12CBF422C32FD854A3DB798D9C6572E1CAE54B59 95603~|~1~|~1~|~01/NHS~|~ADA 32 6.73-19.85~|~05 - 4R Maintenance - Resurfacing~|~14E5501E71A24F4ECAAEF9F164025E64E77AAFFE 95603~|~1~|~2~|~02/NHS~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~926C92DD35E7B4219AF19F64A89338B58CAA3DBF 95603~|~1~|~3~|~03/NHS~|~Guardrail along project limits.~|~05 - 4R Maintenance - Resurfacing~|~FA40330169239516ACC3F68C45751FFCC1FD43E3 95603~|~1~|~4~|~04/SAF~|~Recessed-Wet Reflective Pavement Markings.~|~21 - Safety~|~38897F71497BB1A80AE1B9540C2FE061FF6063D4 116280~|~1~|~2~|~02/NFP~|~Bridge Maintenance~|~13 - Bridge Rehabilitation~|~A4B7855DB5DA1A2C9E01C0B6400A505435667FB7 116280~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with RepairsASD-302-0.00 to 3.935ASD-42-15.143 to 19.363WAY-301-0.00 to 3.838WAY-42-0.00 to 0.391~|~05 - 4R Maintenance - Resurfacing~|~FBF39AE2948802627BC8E747AAAA3C895D1B297D 90220~|~1~|~1~|~01/NFP~|~Project is 100% state funded.~|~21 - Safety~|~EE2A3E5F96332788EFB32F1E155138DC13D20E46 76831~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~890B3530750C05738F19932EF3374497320EFE02 120500~|~1~|~1~|~01/NFP~|~Resurface Grand Lake Campground Phase 2~|~05 - 4R Maintenance - Resurfacing~|~8E13BF6A9A9DBDC7E114353C6177D161FE82FD72 110677~|~1~|~1~|~01/STR~|~Resurfacing of TRU SR 88 from 19.11 to 22.76.~|~~|~F47675DE6E9F21BB9E7F91177AFA7607DE05D225 110677~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span.~|~~|~62152A55B9EC1D17C5CEAA83346272EEC878B45C 102315~|~1~|~1~|~01/NFA~|~Lost Creek Reserve and Knoop Agricultural Center drives and parking lots.~|~44 - Other~|~F2D9CBE4BF73D8D1258516B0B5A3548F00867242 117511~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~93F03A7AFBAC7D6D444161F8C4DD0D9A50130DBA 112740~|~1~|~1~|~01/MPO~|~Resurfacing of Wooster Rd from 31st St SW to Hudson Run Rd in the City of Barberton.~|~~|~257BEA4949492ADEBB431CAD2A2719B568B851CC 121240~|~1~|~1~|~01/SAE~|~Plan Split to add signs~|~21 - Safety~|~C51B78CECCF1806EC88413EF8565F4A59ADB7C37 123652~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities. ~|~47 - Bridge Preventive Maintenance~|~6A63D0C40EE1884F160C06EAB74CAB8C1DDF5F16 109827~|~1~|~1~|~01/NFP~|~Pavement markings on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~811EE12FB3299C5CB6FE9FA9E4487F50CE7EE1CC 108960~|~1~|~1~|~01/SAF~|~Widening of Strip Ave between Dressler Rd and Mega St. Strip Ave has been reclassified as a Minor Arterial and is eligible for federal funds.~|~03 - Reconstruction - Added Capacity~|~EA20E7E2E4D80814C166F6532CCE53C03A4FCD5B 104180~|~1~|~1~|~01/NFA~|~"01/NFA/OT/ " - GSM project (100% 4SS7) - slide repair on MUS-666.~|~~|~2D192F11F333EBFB1E5FD5BD482AFAF260BBA009 114853~|~1~|~1~|~01/SAF/IMS~|~Reflective/wet reflective pavement markers for the interstate locations.~|~21 - Safety~|~28B51C9368362CAB1B98E09CBFE52ECB45C259F6 114853~|~1~|~2~|~02/SAF/NHS~|~Reflective/wet reflective pavement markers for the NHS locations. ~|~21 - Safety~|~4CD6EEE3258558AB2F91F8492CA783B7C570AF3C 114853~|~1~|~3~|~03/SAF/S>2~|~Reflective/wet reflective pavement markers for the large urban locations. ~|~21 - Safety~|~A69AE409A57F53CF302A6B039A25B7ADDE997DB5 95101~|~1~|~1~|~01/S>2/Warr~|~Resurfacing of Pine Avenue (CR-69) including curb ramps, guardrail, signing, and pavement markings, in the City of Warren, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~C72891929052808B58C63F68B6AD176DE1DEDBD2 117573~|~1~|~1~|~01/NFP~|~Landslide project at the Athens County Garage. Funded 100% State.~|~17 - Construction Engineering~|~12C616D6BC4AAAB8B56C0F45AB303287F416A91F 96520~|~1~|~1~|~01/NHS~|~Resurfacing of TRU US 422 from 8.09 to 9.26.~|~~|~0F9CE52D022EBEE94E958B13CF1B915DD9DD5095 96520~|~1~|~2~|~02/NHS~|~Minor Bridge work to SFN 7807015 TRU US 422 8.79 over Mahoning River.~|~~|~B969986AEF75C14200B2F25679F3850E109CF0C0 102352~|~1~|~2~|~02/NHS/KENT~|~POR SR 43 from 9.89 to 10.23POR SR 261 from 3.85 to 4.13 Urban paving in the City of Kent.~|~05 - 4R Maintenance - Resurfacing~|~402C997F4CFBAF9DE9A2D9FCD3259424832E18A0 102352~|~1~|~1~|~01/NHS~|~Double Microsurfacing of POR SR 43 from 7.51 to 8.15 and 8.50 to 9.89.Microsurfacing of POR SR 59 from 5.87 to 6.83 and POR SR 261 from 3.51 to 3.85 and 4.13 to 5.06.~|~05 - 4R Maintenance - Resurfacing~|~A8F1BBC897ED358B070FEBD1A232904604DEEDF5 95456~|~1~|~2~|~02/STR~|~"02/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue- SR 800- 00.00-02.48~|~~|~0CBE1F1A0E676F6B8856A26C13F228278D415757 95456~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue- USR 22-14.67-31.04~|~~|~FB09F8F70840FD495A2D6A3D16ACFA3AD40E2659 94298~|~1~|~1~|~01/IMS~|~Landslide repair project using GSM funds. WAS 77 4.65-4.70. Interstate route funded 90 federal/10 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~176EEF74A477BDE035419F31076C434DB6992A8B 25675~|~1~|~1~|~01/IMS~|~Resurfacing with related bridge work on Lic-IR 70-09.55 to 15.96~|~05 - 4R Maintenance - Resurfacing~|~AE3C432016A7D2FF087AE6F4BB7EB1C7FD603A47 25675~|~1~|~2~|~02/STR~|~Resurfacing with related bridge work on Lic-SR 37~|~05 - 4R Maintenance - Resurfacing~|~420A927340CF8A614CC53C895DF773B7BB5F3334 108149~|~1~|~1~|~01/S>2~|~Urban Paving Plan split: FRA-3-27.26-27.83~|~05 - 4R Maintenance - Resurfacing~|~671DF7F819F356620CEB673039A30DEE9E14CFC6 123450~|~1~|~1~|~01/STR~|~Resurfacing US 250 from SLM 0.00 to SLM 6.62, and SR 331 from SLM 7.53 to SLM 9.96.~|~05 - 4R Maintenance - Resurfacing~|~4F0F155B61F5DAF7F0FDAE6F30A863B73DDDCF7D 123450~|~1~|~2~|~02/S50~|~Resurfacing US 40 from SLM 26.96 to SLM 27.45 and US 250 from SLM 6.62 to SLM 9.08.~|~05 - 4R Maintenance - Resurfacing~|~D6655C43C69D5D77FB97980A580556A0F400F7F8 111236~|~1~|~1~|~01/NFP~|~All work to construct the noise wall.~|~44 - Other~|~88972529A160777EC8044342D9781F18478D0755 97640~|~1~|~2~|~02/BRO~|~Replace superstructure with minimal approach transitions on SFN 5701627 MOT-35-1516.~|~13 - Bridge Rehabilitation~|~57158F687FF66EE766BEC08A5B0DC2A707557D84 97640~|~1~|~1~|~01/IMS~|~Replace deficient bridge deck with minimal approach transitions on SFN5707447 MOT-75-1174~|~13 - Bridge Rehabilitation~|~B3EBA855B954532A72577C12FF9322E54689B3EC 97640~|~1~|~3~|~03/IMS~|~Replace bridge joint seals.~|~47 - Bridge Preventive Maintenance~|~DF12BF66E6D762C7AAD1F4EFBB78B6905E294E09 92690~|~1~|~1~|~01/MPO~|~Resurfacing CR 9 8.81 - 10.29~|~05 - 4R Maintenance - Resurfacing~|~BE3B2605142CFB2516BAB57BE2407C9840576996 117507~|~1~|~1~|~01/NFA~|~Landslide repair project. HOC 678 2.10-2.13. Work includes dig out and replace with dump rock.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2BB792A742042C74594B8014A500DC3D5A4F79E 95625~|~1~|~1~|~01/ERD~|~Widen US-36/William St from Potter St to SR-37 to add a center left turn lane.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~61EFE8F3F2273A82272255EB33988E2A134EC635 95625~|~1~|~2~|~02/ENH~|~Replace bikeway bridge at Lake St (US 42) with a longer span to facilitate turning trucks~|~28 - Facilities for Pedestrians & Bicycles~|~FA774573D223B021C7CCA5C5F8DAF7B2DC02D031 88463~|~1~|~1~|~01/SAE~|~Fast Dry Pavement Markers throughout the district being paid out of 4MP7 funding.~|~21 - Safety~|~12D6AEC852942154971ABA62FAA757DB36E19497 94684~|~1~|~1~|~01/STR~|~Landslide repair project using GSM funds. ATH 56 6.69-6.78. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4F8E388E0C828A9BDF0563B8E252C0B1BF89393E 121276~|~1~|~1~|~01/S5K~|~Culvert replacement project. MEG 124 24.06, CFN 1903016. Funded 80% Federal/20% State.~|~04 - Reconstruction - No Added Capacity~|~6A186ECCABD1DBD4E36C8F09DE8C9CC6717A93E7 93231~|~1~|~1~|~01/MPO~|~City of Centerville signage, flagpoles, decorative fencing decorative columns and ladscaping on the Northeast corner of SR 48 and I-675.~|~31 - Landscaping & Other Scenic Beautification~|~B1C8AF59DE518E8CFE5E1D1B95949B97173F3CD4 107575~|~1~|~1~|~01/IMS~|~2021 Mowing contract.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A2963620D1B88B6C649A694C8E7B923778CA838B 120773~|~1~|~1~|~01/BRO~|~Repair railing on bridge carrying SR 148 over North Fork Captina Creek. Seal deck with HMWM Resin.~|~13 - Bridge Rehabilitation~|~81852E1024D55585FB39E912C5D445FF3B3BC15C 106885~|~1~|~1~|~01/IMS~|~Bridge deck replacement.~|~13 - Bridge Rehabilitation~|~DECE43BABF145D032B0B7FFE0EF47C532460AA61 105632~|~1~|~1~|~01/STR~|~plan split~|~44 - Other~|~B32A0B2A91B2050412B68DB05868DD1018806704 104253~|~1~|~1~|~01/BRF~|~All work for the bridge rehabilitation. Federal funds with the match provided by Defiance County. First priority will be to fund the project at a 95% federal rate using credit bridge program funds to increase the federal precentage. After the available credit bridge program funds are used the project will be 80% federal.~|~13 - Bridge Rehabilitation~|~C313B8730FFCE32895FF365E3D00D88E90B1046C 104253~|~2~|~2~|~02/BRF~|~All work for the bridge rehabilitation. Federal funds with the match provided by Defiance County. First priority will be to fund the project at a 95% federal rate using credit bridge program funds to increase the federal precentage. After the available credit bridge program funds are used the project will be 80% federal.~|~~|~57C150027A58DF70A333932E30235ED8D101CBF9 84035~|~1~|~1~|~01/ENH~|~"01/ENH/OT" - Construct approximately 2,675 linear feet of five foot sidewalk on the south side of SR 14 (East State Street) from Eastgate Plaza to Wal-Mart Plaza, includes retaining wall; construct approximately 200' of five foot sidewalk along the east side of Cunnigham Road. 80/20 Fed Local funding.~|~28 - Facilities for Pedestrians & Bicycles~|~CB0C21CAFD1AC09D398C31E5E6DAC6CB6B9076AD 92800~|~1~|~1~|~01/NHS~|~Resurfacing. Includes ramps M, N, BX, BY, BZ, CA in interchange.~|~05 - 4R Maintenance - Resurfacing~|~8958F6A3207C95121410D6DC5C7617D522095A92 92800~|~1~|~2~|~02/NHS~|~Plan Split to cover pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~A90CF577B36E64EFBD2BEA19E8AEFAE88CCCDCA5 120193~|~1~|~1~|~01/ENH~|~CR 56 (Fairground Rd), CR 58 (Bronze Heights), and Main St. and Lewis Street within the Village of Caldwell: sidewalk, drainage, curb ramps, lighting, cross walks, speed detectors, and other safety elements to be installed and constructed throughout the length to improve the pedestrian safety along the newly proposed sport complex.~|~21 - Safety~|~9FC19183EA65760B989A3E8443697FAF1C143EC1 110469~|~1~|~1~|~01/SAE~|~At the intersection of SR-131 & Wolfpen Pleasant Hill Road, upgrade the existing signal including changing the eastbound left turn movement to protected only. Upgrade the intersection to provide ADA pedestrian crossings.~|~21 - Safety~|~070650BE0620C027A0A488A6933E70D3E9476CC2 104846~|~1~|~1~|~01/NFP~|~Construct 3500 ton salt building~|~01 - New Construction~|~52713A0CC0ADF6DFBB5A94D4D1650C1A282DC9AB 118576~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/PV~|~21 - Safety~|~E70CBA4DF07D22ACF34809555C01B88C4CA145D2 123864~|~1~|~1~|~01/S50~|~All work included in this split.~|~21 - Safety~|~556D4D289B6477D8464F957EF450DF4D1B0687F4 122028~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~2A83D43C333A7951CAAEE37207CA0F131429C420 109843~|~1~|~1~|~01/STR~|~ROS 104 18.68-25.74~|~05 - 4R Maintenance - Resurfacing~|~D81F2CE268F3B45A3F68FBE4ACC6192B6C40BAAD 109843~|~1~|~2~|~02/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~67B8D49AF1BC8E46E5EEB4DBAA949F131DFAC992 109843~|~1~|~3~|~03/SAF~|~Safety funded centerline rumble stripe.~|~17 - Construction Engineering~|~37F8583B79C2D58CB5911CBBA493491F849C2811 95515~|~1~|~1~|~01/ERD~|~For former CSX RR bridge removal and construction of new Bike/Hike trail~|~~|~0D083BE47883D4F1830FAAF11F3DEE811C2609E1 95515~|~1~|~2~|~02/S>2~|~For the removal of former CSX RR bridge and construction of Bike/Hike trail~|~01 - New Construction~|~AC6D5E1CF324C6B8DFE9A2BF2158168FD795BE35 95515~|~1~|~3~|~03/NFP~|~For CE costs 100% local.~|~17 - Construction Engineering~|~CCC8C820841CCAD2C31EB80DB80A7CBB72497F27 109493~|~1~|~1~|~01/SAF~|~Improve intersection of FRA SR 317 at Rohr Rd.~|~21 - Safety~|~891BBF3F1A01365EE5FD914B27E7693FA8E43D2A 124627~|~1~|~1~|~01/NHS~|~All work to rehabilitate the twin bridges over Linn Street and three railroads is to be split 50/50 between Major Investments and District Allocation.~|~13 - Bridge Rehabilitation~|~5CB1B15059D619BC64F09EA06A18272CBD55C15E 102666~|~1~|~1~|~01/BRO~|~Fiscal Year 2022 sealing of concrete bridge decks along IR 70 in Belmont county at various locations.~|~47 - Bridge Preventive Maintenance~|~8FD10C6C1F9303A5359F5B734BC4E19F88B220C3 106208~|~1~|~1~|~01/IMS~|~FY 2022 Block PID for drainage system maintenance/repair.~|~~|~1F9C7E87F598D36768149857F6E6EBEF98437329 82907~|~1~|~4~|~04/NHS~|~6700519 SPORSR00014**C POR-SR-14 1.740 1.740 14.0 6700551 SPORSR00014**C POR-SR-14 1.970 1.970 12.0 ~|~13 - Bridge Rehabilitation~|~210A7B777BEBC9C43125B866E38A8FC931470022 82907~|~1~|~1~|~01/NHS~|~Resurfacing of SR-14 from SLM 1.76 to SLM 3.11.~|~05 - 4R Maintenance - Resurfacing~|~6D716F8D4E8A3F208D6506F1F5299137E3C6917F 82907~|~1~|~3~|~03/MPO~|~Partial and full depth pavement repairs. Balance from the City of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~A825866AF594599C8BEE775EC540863FC92999CF 82907~|~1~|~2~|~02/S>2~|~Resurfacing of SR-14 from SLM 3.11 to SLM 3.67.~|~05 - 4R Maintenance - Resurfacing~|~AA427BDD04E366BB61628A41ADBFA4766A789D6F 117517~|~1~|~1~|~01/SAF~|~Work that is federal aid eligible to enhance safety and installing sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~CDA46729EC1F16F81E12044B3BED2BA8ABE49E7E 108732~|~1~|~1~|~01/NFA~|~Work to replace Ashton Lane bridge over Porter Creek.~|~10 - Bridge Replacement~|~961FFA9A61B97D07F5097EA34DC0ABBE538783F2 108732~|~1~|~2~|~02/NFA~|~Plan split for Columbia Gas of Ohio-Nisource utility work.~|~10 - Bridge Replacement~|~4E2C9830EDC71B269FF0FBC97DA28A8F735DF901 115085~|~1~|~1~|~01/NFP~|~SFN 0200506 Lift parapet end sections SFN 0200522 Fix leaning parapet 100% state funds from the District Preservation Program budget.~|~~|~3FA07EFDD840283BAACE4C883C7669710EF734FB 118832~|~1~|~1~|~01/S5K~|~HUR SR 103 02.04 Lining~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDC0D71BCE43968631B6E5EA68487CFF946FF063 96267~|~1~|~1~|~01/BRF~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4506006 LIC SR657 01.94 carrying SR 657 over Clear Fork Creek - - Eligible for Rehabilitation and Replacement: Length = 142; SO/FO (1); SR =75.3; DSR = 4~|~13 - Bridge Rehabilitation~|~66FC71108AF1DBAB38E041053839A77E46EA2E33 106664~|~1~|~1~|~01/NFA/ODNR~|~ODNR Program Funds - 4BF7 (100% State) - No CAP - Replacement of deficient culverts in Salt Fork State Park.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F4D3C3442BD0A86520EE3F7FC81DE89BFB3799E4 104992~|~1~|~1~|~01/NFP~|~District-wide Crack Sealing - 100% State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5F8437324ACAD31ED3EAA900480DBC8DB89DD548 120666~|~1~|~1~|~01/NHS~|~All work included in this split.~|~17 - Construction Engineering~|~682A136A1EBBABCE49B5653F2438F58B8E6407F0 126364~|~1~|~1~|~01/NFA~|~Bridge replacement~|~10 - Bridge Replacement~|~3F95D79D9D7F7DFC9D81ACA7EB814275309E35A5 102841~|~1~|~1~|~01/STR~|~Smoothseal and AC overlay: PIC-22-0.00 to14.36 and PIC-62-0.00 to 6.78~|~05 - 4R Maintenance - Resurfacing~|~A878C3CDC5E942C4CFA968517B4E9424FE814807 102841~|~1~|~2~|~02/S<2~|~Overlay and smoothseal on PIC-62-6.78 to 7.64~|~05 - 4R Maintenance - Resurfacing~|~1FF5548FF5886813406F6F2F5F8CD4FA51A29E12 114362~|~1~|~1~|~01/NFA~|~Resurfacing throughout Guilford Lake State Park~|~05 - 4R Maintenance - Resurfacing~|~E3E0D67F1FEFEDC53F125152535E02813929DA2D 100980~|~1~|~1~|~01/STR~|~DSR# HOL-005~|~03 - Reconstruction - Added Capacity~|~95559D9D84ECBF702233272466405E09526D3FC8 105363~|~1~|~1~|~01/S<2~|~Smooth seal on small urban route: LOG SR 366 SLM 6.03 to 7.24~|~05 - 4R Maintenance - Resurfacing~|~0717A4FC97285911448CBB6536D7DA955F1343D4 105363~|~1~|~2~|~02/STR~|~Smooth seal on rural routes: LOG SR 366 SLM 7.24 to 9.78~|~05 - 4R Maintenance - Resurfacing~|~CBC7DA951E258A39E27E0DD69BF5309AEDF25A26 110006~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~B95F7D18A0C5C9A5687D72F0FF452B99236E6D30 110006~|~1~|~2~|~02/S>2~|~Urban Area (STP>200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4565C7362B9F1E760A1C194AFAB0FCD5A72BD566 110006~|~1~|~3~|~03/S<2~|~Urban Area (STP<200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~8387375BA80DD9B1736F73483D748CABD41A38DD 110006~|~1~|~4~|~04/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~3D26B2805724DE01505785207DC894FADBE9EB54 110006~|~1~|~5~|~05/NFA~|~Non-Fed Aid Plan Split~|~05 - 4R Maintenance - Resurfacing~|~FBDA72332814B906C51EF94C757A214FEEF1A4A4 90909~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~50488E1C6CBCD9195C1FE6BF56DBA6A2361C4EB5 103430~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4.~|~44 - Other~|~4B63FE722D3924F0AB5DECC9E1FC8B7587DDD753 113834~|~1~|~1~|~01/STR~|~Major rehabilitation of SR 149~|~04 - Reconstruction - No Added Capacity~|~729DAB78482D4F21D5B2AC83ED48DCDA37960608 114823~|~1~|~1~|~01/SAF~|~Signal replacement items~|~21 - Safety~|~B1459A1553CEEA6D71F0F2C2C910CF672004EC42 114823~|~2~|~2~|~02/NHS~|~TLCI Work from PID 116996~|~21 - Safety~|~2A5A86798EAD265A888BCED2110511D611FA7E95 109449~|~1~|~1~|~01/NHS~|~See linked structures > 20' span.~|~~|~451BE6117FD4F4F27F53ECD8FB026AEC3EFB553C 122349~|~1~|~1~|~01/NHS~|~Repair damage to SR 231 bridge over US 23~|~13 - Bridge Rehabilitation~|~B86EC6FD812F1A56B233A151F6E0A06841149671 100832~|~1~|~1~|~01/S>2~|~Rehab Bridge BUT-122D-0159L (EB SR 122 over University Blvd in Middletown) by replacing the bearings, modifying the abutment seats and replacing the expansion joints.~|~13 - Bridge Rehabilitation~|~731A9CDBE8EA39BB0F19ADEACD95EADDA62E28D9 123717~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with / without repairs on various priority system routes in District 3~|~05 - 4R Maintenance - Resurfacing~|~26FA9559966E080AB17315C9EF8B6129361825C5 87280~|~1~|~1~|~01/NHS~|~ROS US35 4.48 - 15.22 Resurfacing ProjectOn US35, it is proposed to begin resurfacing 0.5 mile (SLM 4.48) west of SR138 and continue east to 15.22 mile marker SLM 15.22).80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~A1539E3F8C53A6F2636782C78D1CA53E56DC940B 87280~|~1~|~2~|~02/NHS~|~resurfacing bridges~|~47 - Bridge Preventive Maintenance~|~602F1540CE4F632B9BDB534FBCB4D59753E00E52 87280~|~1~|~3~|~03/NHS~|~Deck patching ROS 35 8.69 (7101589)ROS 35 8.70 (7101600)~|~04 - Reconstruction - No Added Capacity~|~2A068EEBEC263A22F7FF1382481AD451874EAD86 102529~|~1~|~1~|~01/NFP~|~Landscaping~|~31 - Landscaping & Other Scenic Beautification~|~5C89D1667E2B7ED76E39755303A9DD6AD0145C52 112891~|~1~|~1~|~01/NFA~|~Bypass existing covered bridge WAS TR 39 0252, SFN 8437718 and build a new structure to replace the existing bridge on new alignment. Funded 95 Federal/5 Local (15% Credit Bridge).~|~10 - Bridge Replacement~|~C013F8F74087D6D0E6B063585E454DA093430C43 89134~|~1~|~1~|~01/NFA~|~Demolish 5th Ave salt dome and replace with a tarp building~|~44 - Other~|~4C59604145B22053527AEFD6DD0B1B5391BB6C81 80982~|~1~|~2~|~02/ENH~|~Plan split for all enhancement eligible items of work.~|~~|~4531212A0782E29BE3E8C4A76C10AC6CAD4E5CFB 80982~|~1~|~1~|~01/ERD~|~Plan split for all work items eligible for the federal earmark.~|~~|~A1D4DA608AF20EDA2D26D29B4EFC82ABC473F7AC 108739~|~1~|~1~|~01/NFA~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8E9B8FE7BC44837AFD2F2DD4183362BB7B9EAB6C 96978~|~1~|~1~|~01/IMS~|~Pavement markings on various routes in ATB, MAH and TRU Counties.~|~44 - Other~|~F61707BCCE321E6766563D68E00C2E52F0D5B033 95090~|~1~|~1~|~01/S<2/NEWA~|~"01/S<2/PV/NEWA" - LCATS STP/City of Newark 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP $1.2 Mill 4TA7 - City of Newark resurfacing project on CR125 (21st Street) from Granville Rd to SR 13~|~05 - 4R Maintenance - Resurfacing~|~D697467F540081DC11B45AA5899B143FDCD079D2 96192~|~1~|~1~|~01/STR~|~STP Rural 100% State (SLM 3.07 to 3.23)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D2D2C082AC8033193ED9186F8242D6A3334BFDA8 96192~|~1~|~2~|~02/S<2~|~STP 100% State due to Delaware Urban Area (SLM 3.23 to 3.37)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D41A7AB738A096C62905B9E659A0C2FFDF4D4ECF 119350~|~1~|~1~|~01/STR~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~17618A9C41ACC06FD273128280883A6DD42DAA4F 125938~|~1~|~1~|~01/SAF~|~Traffic signal replacements and upgrades. ~|~21 - Safety~|~E6CC3B692E7B9C7A5C2670758B934477FB7C6EB5 84593~|~1~|~3~|~03/STR~|~Replacement of structure at POR SR 225 7.65, sfn# 6703984.~|~13 - Bridge Rehabilitation~|~0B6A00176DAF61F3978056B8EDE175F2F5B3B77A 84593~|~1~|~2~|~02/STR~|~Plan Split for POR SR 14 from 18.07 to 25.34, POR SR 183 for 03.00 to 7.61.~|~05 - 4R Maintenance - Resurfacing~|~C14009E44A35C2C1C6A1E5EB344999C372004855 84593~|~1~|~1~|~01/STR~|~Plan Split for SFN 6700853 POR SR 14 19.20 over Branch of Silver Creek, SFN 6700942 POR SR 14 20.03 over Silver Creek, SFN 6700977 POR SR 14 22.09 over Tributary of Mahoning River, SFN 6703739 POR SR 183 05.12 over Branch of Mahoning River.~|~13 - Bridge Rehabilitation~|~F1839FC41671D1C085E7954064DD8B207C525857 100741~|~1~|~1~|~01/MPO~|~Resurfacing South Avenue from Midlothian Blvd to Williamson Ave. Mill and fill 2.25" and includes full and partial depth repairs, replacing existing curb ramps with ADA compliant curb ramps, new pavement markings and signs.~|~05 - 4R Maintenance - Resurfacing~|~EC484AD157E1C9083AF79DC75F80F3CC58223101 107652~|~1~|~1~|~01/STR~|~Resurfacing on US 68 from the north boundary of the Kenton Urban Area at TR 114 at SLM 11.06 in Hardin County to Washington Street in the Village of Dunkirk at SLM 19.22, from the north corporation limits of the Village of Dunkirk to the Hancock County Line at SLM 21.80, from just north of US 30 at SLM 0.77 to the Village of Arlington at SLM 4.70, and from the north corporation limits of the Village of Arlington at SLM 5.59 to the south boundary of the Findlay Urban Area at the SR 15 interchange ramps at 11.67 in Hancock County. District preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~2DB264267863E2B139DA94A1ED6733827FC0323B 107652~|~1~|~2~|~02/S<2~|~Resurfacing on US 68 from the beginning of the project at the north corporation limits of the City of Kenton at SLM 10.61 in Hardin County to the north boundary of the Kenton Urban Area at TR 114 at SLM 11.06 and from the south boundary of the Findlay Urban Area at the SR 15 interchange ramps at 11.67 to the end of the project at SR 15 at SLM 12.00. District preservation program funds (4PF7 - 80% and 4PS7 - 20%). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~1C04574105ED14970C7EA19464E0F782C7E4BA2C 98622~|~1~|~1~|~01/NFP~|~100% State funding for turnpike mitigation eligible work items.~|~44 - Other~|~FC71F53F89D819FDCA62CD4A3031069B96138064 122752~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~90F3DDEBB0130149FE6003800478CA5156C17D0D 101180~|~1~|~1~|~01/NFA~|~Smooth seal on Non-Federal aid routes: AUG SR 198 SLM 8.19 to 11.01~|~05 - 4R Maintenance - Resurfacing~|~5248A66D3EB1A72EF422343892D298BFEB743F56 114851~|~1~|~1~|~01/STR~|~STP Rural Plan Split on MRW-314~|~05 - 4R Maintenance - Resurfacing~|~21677844E50FD37574460426AC22B77DE2D020BE 125040~|~1~|~1~|~01/NHS/MVER~|~Intersection and sidewalk improvements along SR 13 (Sandusky St/Cassell Road) in the City of Mount Vernon.~|~21 - Safety~|~6017F26D6E771DCD0714C51D4D3D68A30DC71B11 94287~|~1~|~1~|~01/S>2~|~Resurfacing of County Route 171 (Cleveland Road) from Highland Avenue (SLM 0.26) to North Corporation limit (SLM 0.96) in the City of Ravenna, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~4E58EA69CE48BCCE929AE22EF6C80BD7C63372C6 116128~|~1~|~1~|~01/IMS~|~Repair 200' retaining wall near southbound STA IR 77 2.57.~|~66 - Resilience Improvement - Highway Project ~|~D2C3CF779AA00EAA077A8A1480EACB94E2A3019E 102895~|~1~|~1~|~01/SAE~|~Paint pavement markings on Huron County roads.~|~21 - Safety~|~4A94419813D1B4F9EA67E242C069AE53A6FA898B 102895~|~2~|~2~|~02/SAE~|~Thermoplastic pavement marking on various Huron County routes~|~21 - Safety~|~16041ADED21D7382CFF8BD648B6B21CDF9DFF65C 125041~|~1~|~1~|~01/NFA/FRED~|~Sidewalk improvements along (Columbus Road) in the Village of Fredericktown.~|~28 - Facilities for Pedestrians & Bicycles~|~8C8D83D449DBE547D558B8EEA4047403926EF704 107391~|~1~|~1~|~01/NFP~|~Mowing on various routes in Franklin County~|~44 - Other~|~AC1D02865BDF5AFADFC2E68430CA45E3D607B2F4 126582~|~1~|~1~|~01/SAF~|~Primary split for Safety funds~|~21 - Safety~|~A32B1F066DE2D9A55B2F7792DD5640DC61041AB3 118761~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~27E7026EC8DBDC591704CCC47CA58F2036CB4219 111393~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE TR 307 0.72, SFN 5634768. Work includes abutments and approach work. Not on the federal aid system funded 100% Federal.~|~10 - Bridge Replacement~|~A6CF84313C0CBEF9791C44EE5E93570C31D69EF1 101402~|~1~|~2~|~02/IMS~|~Bridge Rehab work. See linked structures.~|~~|~4B63BF19BA956806FFDD3CB0E5273A51C8195268 101402~|~1~|~4~|~04/NHS~|~Resurfacing of SUM State Route 8 from SLM 0.00 to SLM 0.63, in the City of Akron.~|~~|~CB359458316C1A4CC5ACD8DA5C15BB520C3DE87D 101402~|~1~|~3~|~03/IMS~|~Pavement replacement. SUM IR76 from SLM 11.01 to SLM 12.03 and SUM IR77 from SLM 11.54 to SLM 11.86, in the City of Akron.~|~15 - Preliminary Engineering~|~61598A035F53BDA7D261018FFCD2883A4FE453EA 101402~|~1~|~1~|~01/IMS~|~Constructing two new flyover bridges in the central interchange.~|~~|~74EAFC2FB8E20FA8E1208BB31F51C7AB35A7E157 101402~|~1~|~5~|~05/IMS~|~Removal of Lafollette structure, replaced with pedestrian structure.~|~~|~343D85416C7805BAD661E2BD6B5A35CD7C760FC0 101964~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control - 2 lane highways.~|~44 - Other~|~A1BF3480EAED7D87D74BD798389CA36C5115B406 107842~|~1~|~1~|~01/STR~|~all of the routes in the Rural area~|~05 - 4R Maintenance - Resurfacing~|~339A283BCD14BBC9EB01CCF33F49BB5C61364C48 107842~|~1~|~2~|~02/S>2~|~MAD-40 in Columbus Urban Area~|~05 - 4R Maintenance - Resurfacing~|~FE2B54AD9166AE36AAD3C66441A9AF304782B27E 124653~|~1~|~1~|~01/SAF~|~Construction of riverside trail~|~21 - Safety~|~EFCF2D2DEFABE7D4AD51A8FD565CA7717EE3E038 119903~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-C~|~63 - Electric Vehicles & Charging Infrastructure~|~35B093FE206B455D5D9F6F4B36CF4E19CB9C0555 92391~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of 1) 2301814 FAI SR158 13.34 Intersect: Pawpaw Creek; Not BR Eligible for Replacement: Length=12 SD/FO(1) SR=71.5 DSR=" ";~|~13 - Bridge Rehabilitation~|~D3557FEBD051EC8CFC9D0D81624F2807B6A92284 92391~|~2~|~2~|~02/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of 1) 2301830 FAI SR158 15.27 Intersect: Trib Of Reservoir Feeder; Not BR Eligible for Replacement: Length=20 SD/FO(1) SR=70.2 DSR="N "~|~10 - Bridge Replacement~|~E69971E8D0F7292626DD1E6504F574B825F513FC 94757~|~1~|~2~|~02/SAF~|~Rebuild 2 signals with mast arms, video and dilemma zone detection. Work also includes upgrading pedestrian facilities at intersections. To be funded by the City of Piqua includes SLM 11.56 (Scot/Centre) and SLM 11.94 (Looney Road).~|~21 - Safety~|~5AA31DD549A0A974D1306D017C6FF9F1B211C82F 94757~|~1~|~1~|~01/SAF~|~Rebuild the two signalized ramp intersections with mast arms along with video and advanced dilemma zone detection. US 36 & IR 75 southbound ramp to the US 36 & IR 75 northbound ramp. MIA 36 SLM 11.69 to 11.83.~|~21 - Safety~|~E20EBF43FCB430A8407D43721254A47C42D48C04 108379~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 555 24.60-24.64. MRG_NF_0005. Not on the federal aid system funded 100% state ER funds.~|~~|~CB09761791B9FA683A88C3DF7E0BDF303249CC03 116099~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~84F7FEED388E94E88A38CC24D6E39011866C6B20 95926~|~1~|~1~|~01/IMS~|~Overlay bridge deck with LMC using hydrodemolition, patch areas of structure, refurbish bearings and seal all concrete surfaces with epoxy urethane. Bridge # CLA-675-0079, SFN 1206508.~|~13 - Bridge Rehabilitation~|~9FCC536C729036EBFFBB2EE12B64797922A5D146 87157~|~1~|~1~|~01/STR~|~Bridge and roadway work associated with Bridge GRE-68-0084 (SFN 2901110).~|~13 - Bridge Rehabilitation~|~04D9BE316561BBE1673408A3233196B78E41C305 87157~|~1~|~2~|~02/NHS~|~Bridge and roadway work associated with bridge GRE-68-0854 (SFN 2901323)~|~13 - Bridge Rehabilitation~|~ABD08DFB232C8D92950AB78E5E18B80CA9D5F2BA 98791~|~1~|~1~|~01/NFA~|~Constructing Tech Drive, 1,287 foot roadway, 26' wide into what will become the main access in to the future Logan County Industrial Park as well as improvements to CR 32 where Tech Drive will originate.~|~01 - New Construction~|~17AACF5E7545E13CC8542CCC455AF8FF63FBFE43 95856~|~1~|~1~|~01/STR~|~Plan split to replace culvert~|~~|~EA269EDB102E0BA4628FCDFE07D03EE5370E23F6 89094~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using and asphalt overlay treatment. Work includes pavement marking and berm conditioning. WWW-MPO funded. WAS CR 4 2.30-2.36, 3.28-4.65. Includes CR 79 0.00-0.27. Rural other federal aid funded 80% Federal/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~2CBC9A79ED31A4893B9DD2FBCAC1D4EADDD99268 89094~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using and asphalt overlay treatment. Work includes pavement marking and berm conditioning. WWW-MPO funded. WAS CR 4 1.76-2.30, 2.36-3.28. Urban other federal aid funded 80% Federal/20% Local.~|~05 - 4R Maintenance - Resurfacing~|~45A85730A62703A38BD12054D1CBB367A01FF8C9 93261~|~1~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3001350 GUE IR70 9.94 Intersect: Wb I-70 Over Nb I-77; Not BR Eligible for Rehabilitation: Length=159 SD/FO(0) SR=88. DSR=4~|~~|~A5D736CB5B4C466F971912A919EFE10AF6912676 93261~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 3001385 GUE IR70 9.94 Intersect: Eb I-70 Over Nb I-77; BR Eligible for Rehabilitation: Length=99 SD/FO(2) SR=33.9 DSR=6~|~~|~CE91A133E2E61DBB9F0A1CCA4113B128E97D6018 112759~|~1~|~1~|~01/NHS~|~Under water Bridge Inspection~|~~|~21ED0940BFF37B923189E180D35E1DC35842D553 93149~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6006035 MUS SR555 4.93 Intersect: Over Turkey Run; Not BR Eligible for Rehabilitation: Length=54 SD/FO(0) SR=82.7 DSR=6~|~13 - Bridge Rehabilitation~|~3CA0BA1E02386B07AAA30C03FBE0C83E3526DBF1 93786~|~1~|~1~|~01/STR~|~Replace SFN 3600874Located 1.86 miles west of SR753 on SR28 It is proposed to replace the dificient structure. 80/20 Split01/STP/BR/State~|~10 - Bridge Replacement~|~06DC1269265DFEFA431538DB1775819BCAD3ABEF 93298~|~1~|~1~|~01/MPO/LAK~|~Plan split for resurfacing federally eligible roadway with STBG funding~|~05 - 4R Maintenance - Resurfacing~|~BB325E8CC0AC161F1AA58602E5D3D34885A242A0 125686~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~2EF3AB7FB35ABE770ABFA9B190810AF737201E80 121981~|~1~|~1~|~01/SAF~|~Construct shared use path and improve pedestrian crossings along New Germany Trebein Rd (CR-51) and Trebein Rd (CR-84) in Greene County to improve connectivity to Hobson Freedom Park.~|~~|~C772437E5E98A48D97689DBCED48691DAD8A1973 123335~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~E6D20B228C538613A37EA2F7E175AA5AACB55616 123335~|~1~|~2~|~02/STR~|~Minor bridge work~|~~|~3B0B0B744B3FAB67DB08AAC715DEAF72C7BD8ECB 82698~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for STP funds~|~05 - 4R Maintenance - Resurfacing~|~144641CCFBD27F042B54291397F6B23F0A7B6721 82698~|~1~|~2~|~02/NFP~|~Work items that are 100% local participation as well as cost above the federal funding available.~|~05 - 4R Maintenance - Resurfacing~|~A54D1CAA9C71E6C0C812D3B14BCA2560CC6384EF 98205~|~1~|~2~|~02/NHS~|~"02/IMS/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on NHS routes in Coshocton, Muskingum, Guernsey Counties in FY2019~|~~|~2FC26D23071361878006CC83E08FC8B1B24D5DC7 98205~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Crack sealing on Interstate routes in Coshocton, Muskingum, Guernsey Counties in FY 2019~|~~|~998524F9999ACA008DCEBFAB9BFBAF3C6CC1C0AB 98205~|~1~|~3~|~03/S<2~|~"03/S<2/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Urban routes in Coshocton, Muskingum, Guernsey Counties in FY2019~|~~|~60D6E62E65ABD74288023B96D0EE8846BD127F94 98205~|~1~|~4~|~04/STR~|~"04/STR/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Crack sealing on OFAH-Rural routes in Coshocton, Muskingum, Guernsey Counties in FY2019~|~~|~123E23ABD4BEFE5996B16D1F626B189A3288B2CB 98205~|~1~|~5~|~05/NFA~|~"05/NFA/OT/ " - District Preservation 4PS7 (100% State) - No CAP - Crack sealing on NNOFAS-Rural routes in Coshocton, Muskingum, Guernsey Counties in FY2019~|~~|~4758F4A2D12C366AF44E89A501825FFA3081A70B 104166~|~1~|~1~|~01/NHS~|~Work on NHS routes. DEL-23, FRA-23, FRA-33, FRA-16, FRA-161, FRA-317, MAR-23~|~21 - Safety~|~F1636589A0773C8F352C6F68E7D81F8AACBF0031 104166~|~1~|~2~|~02/STR~|~Work on STP Rural routes. MAR-98, PIC-180~|~21 - Safety~|~5454A56A6F5E0A0F498FEF8BBBD0F7C3323F2B4E 89127~|~1~|~1~|~01/BRF~|~Rehabilitate existing bridge; remove superstructure, utilize parts of the existing abutments. Improve sections of Schaadt Road adjacent to the bridge and improve the intersection at the East End of the bridge. Replace, repair and widen all appurtenances associated with the referenced intersection. SFN 5450535 MER-TR-190 0.000 to 2.000~|~13 - Bridge Rehabilitation~|~A7FA4227AF49B5B2A95DD71439DD4D8592C4E28C 121349~|~1~|~1~|~01/S>2~|~All work related to the rehab of bridge CLE-132-0173~|~13 - Bridge Rehabilitation~|~317CE77AB84AF87979620920BE8B889612335A82 102228~|~1~|~1~|~01/NFA~|~The City is constructing a dedicated right - hand turn lane on southbound Tiedeman Road at the I-480 and to replace the concrete pavement and approach slabs north and south of the Tiedeman overpass.~|~~|~61B5E31FF05C7A8B35A4CDA9198E39DCCC93E6B3 116153~|~1~|~1~|~01/STR~|~Work on SR 31 outside the Kenton Urban Area. Funding from the District Capital allocation at 80% federal (4PF7) and 20% state (4PS7).~|~05 - 4R Maintenance - Resurfacing~|~4CA17861F1AA23FE57DB21015E4611EBE396DF47 116153~|~1~|~2~|~02/S5K~|~Resurfacing inside the Kenton Urban Area both inside and outside of the City of Kenton. District Preservation Program funds. No local funds. On both sides of the road from 8.742 to 9.956 and on the right side of the road from 9.956 to 10.155.~|~05 - 4R Maintenance - Resurfacing~|~848B12C79DCD0E5A95E2D95A85A6C62FDCFBDE8C 103533~|~1~|~2~|~02/S>2/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for OFAH-Urban (Columbus) - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing on specified routes.~|~05 - 4R Maintenance - Resurfacing~|~4EC3C52D85F168A971121A15981F7CFF3FF312EC 103533~|~1~|~3~|~03/STR/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for OFAH-Rural Routes - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing on specified routes~|~05 - 4R Maintenance - Resurfacing~|~EEA5CDEB7FEADCD3CC25F4A962F0D4256A39649E 103533~|~1~|~4~|~04/S<2/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for OFAH-Urban Routes - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing on specified routes~|~05 - 4R Maintenance - Resurfacing~|~53BDFE1978EC3CD1764831729A286E2C6B0EFFDB 103533~|~1~|~1~|~01/NFA/LCEO~|~Licking County Engineer's Office CEAO Surface Transportation Funding for minor collector - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Minor Collector resurfacing on specified routes - (Contingent upon Congress continuing to include Minor Collectors in the Transportation Bills.~|~05 - 4R Maintenance - Resurfacing~|~0FB3AB394EFAD48FFB40D7C84E7FA3A5C49A5D32 119919~|~1~|~1~|~01/NHS~|~PROTECT bridge carrying SR 7 over Croxton's Run from scour by placing Rock Channel Protection.~|~48 - Bridge Protection~|~85BE45BCF5A181C6167EFD3C1F6AD368D5040F5A 105220~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate Route bridge.~|~13 - Bridge Rehabilitation~|~3657EE5F09540F1ED8A379B3AE779BF0BE3DE93C 77889~|~1~|~1~|~01/IMS~|~Bridge - reconstruction on or over HAM-75~|~10 - Bridge Replacement~|~0DDC88EA2171C1F0127F62DC481351F29AEEFFC2 77889~|~1~|~2~|~02/NHS~|~Bridge - replacement of the overhead RR bridge over HAM-562~|~10 - Bridge Replacement~|~DBA0FB990C1906CE698299318AF2A56BF0183482 77889~|~1~|~3~|~03/BRF~|~Bridge - replacement of the RR bridge over Prosser Ave. New bridge SFN will be 3160007~|~08 - Bridge - New Construction~|~C1FDEF9A23C9F0E18C9F3B3124BCF03A9A80D2C5 77889~|~1~|~4~|~04/NFA~|~Plan split for railroad track bed reconstruction to be performed by the roadway contractor.~|~22 - Rail/Highway crossing~|~E464C12F8C2B74EC80F6A62AB6BD0A0C8B9B803F 117837~|~1~|~1~|~01/IMS~|~Split for interstate bridge work (non-federal)~|~04 - Reconstruction - No Added Capacity~|~D51218B8B1796CF3277CEEB42C8B82833C83B3E6 117837~|~1~|~2~|~02/NHS~|~Split for non-federal bridge work on the NHS~|~04 - Reconstruction - No Added Capacity~|~247B1AA04008F8537D8B5DAA4CA5067D6071208F 109749~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~01C4B122C5006C94E9255510A32B08BEAF4AA926 109749~|~1~|~2~|~02/S<2~|~AC overlay without repairs~|~17 - Construction Engineering~|~0B180DF115A5427BDE75A24C82FB077A523F4051 82086~|~1~|~1~|~01/BRF~|~Structure removal and replaced with a single span, steel girder over Crandall Run in the City of Youngstown, Ohio.~|~10 - Bridge Replacement~|~3B6B2D062345B68C65400DB0DDBA7C3EC3BB13CC 82086~|~1~|~2~|~02/BRF~|~Work associated with Dominion East Ohio gas line.~|~10 - Bridge Replacement~|~C1DB86D70168883141D106F2D5C9F3F0CF797918 126761~|~1~|~1~|~01/NFA~|~FLAP plan split~|~05 - 4R Maintenance - Resurfacing~|~38D62F2F0E4B9EA41D930049B509ADDB3AD6A277 127162~|~1~|~1~|~01/STR~|~Conduit replacement.~|~04 - Reconstruction - No Added Capacity~|~E8623413130895898FD8D8DCE964379CDA690CA9 112629~|~1~|~1~|~01/MPO/LORD~|~Resurfacing, in the Village of Lordstown.~|~05 - 4R Maintenance - Resurfacing~|~DB5F280A50DE78A82FAF87D9F65DE9A62611F982 106322~|~1~|~1~|~01/NFA~|~ADA Facility Assmts~|~44 - Other~|~40A078E2BAE6C8832B4BF5A7CA2073DD5932169B 96461~|~1~|~1~|~01/NFA~|~Replace HVAC at Mercer County Garage~|~44 - Other~|~E51236EE27ADEA073E253AA25B9F54DD2E844CB2 109773~|~1~|~1~|~01/NHS~|~Fine graded polymer asphalt concrete overlay~|~05 - 4R Maintenance - Resurfacing~|~6FA5F178F014D0C5F36A5D1F515FCC1E90C249E9 109773~|~1~|~2~|~02/SAF~|~Install cable barrier on US 68 from US 40 to SR 334~|~21 - Safety~|~03C38328799D92A169AE2FE032F59D50028C4E86 120671~|~1~|~1~|~01/NHS~|~Plan Split to program project. Update at scope complete.~|~13 - Bridge Rehabilitation~|~A32411CFBA55322D69261733F539F8222AD1917D 109019~|~1~|~1~|~01/ENH~|~All work in this project is in this split. 95% federal funds with Toll Revenue Credit from the Transportation Alternatives Program (TAP). The local match and funds needed over the TAP cap to be provided by the Village of Oakwood.~|~28 - Facilities for Pedestrians & Bicycles~|~90F6EAED3AA2FD62520998297A96B949D796EB48 111503~|~1~|~1~|~01/MPO~|~Transfer of existing fiberoptic interconnect cable to new steel Duke poles and transfer of power service. Kemper Road from Tri-County Parkway to Century Boulevard.~|~21 - Safety~|~682177C3D7F526790B55843D0E395F73207C0CF4 92963~|~1~|~4~|~04/S<2/ZANE~|~"04/S<2/PV/ZANE" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing on 1). Mus-SR 555-(11.18-11.34);~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0DA6601BF165B46652BC2D7F001D826DE9A0D899 92963~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing of 1) Mus-SR 555-04.02 to 08.18; 2) Per-SR 555-03.77 to 04.33; 3) Mrg-SR 555-23.06 to 23.75; 4) Mus-CR 06-12.436 to 12.85~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1EBC89D0DF7BB6709ED5A10ECCFF0EC44334F825 92963~|~1~|~3~|~03/S<2~|~"03/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1). Mus-CR 6-12.85 to 15.43~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6D5A0980AB789E5A77AD471E58E9DE8607E82BC8 92963~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Mus-SR 555-00.00 to 04.02; 2)Per-SR 555-00.74 to 03.77; 3)Mrg-SR 555-26.72-27.16~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FD41B359A66C52D42ACB9FC4D00DC48EDD84AE7F 125386~|~1~|~1~|~01/S5K~|~Resurfacing STP 5,000 - 49,999~|~05 - 4R Maintenance - Resurfacing~|~3B415D375AA127F19E542B7B63193912C3DF0A69 125386~|~1~|~2~|~02/STR~|~Resurfacing Rural ~|~05 - 4R Maintenance - Resurfacing~|~373C8DA4C2B0517BD4CA8F9817BCCC3AF8B301C3 124332~|~1~|~1~|~01/SAE~|~Roundabout~|~21 - Safety~|~CB1E24FFC41220E7E15FE8A06A9548528252A598 124199~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~A73C56D6F360EAC8E1B56577F1B6BCE91DF554F9 91776~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on WAS 26 18.45-29.36. Rural route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~ADBBE5212239A870CCBBD524DF3B8BA607935881 95759~|~1~|~2~|~02/S>2~|~From 0.00 to 3.03~|~05 - 4R Maintenance - Resurfacing~|~068E6820CFF9C489630479DEFEBE71183BCD3D47 95759~|~1~|~1~|~01/STR~|~from SLM 3.03 to 8.35~|~05 - 4R Maintenance - Resurfacing~|~8FE967B2CE08C4F11A2EEF039D5AF6B25186F44D 95759~|~1~|~3~|~03/BRO~|~OTT-579-1.85~|~13 - Bridge Rehabilitation~|~B8D5B0D1BECF0DEF0DAC1BE3F486CF6D737FDA31 109394~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~9D47286872154DD6F0185316CD1A489DA103A8B2 110678~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~~|~9B803142416AFA3C05482259E37C416EB387293E 110678~|~1~|~3~|~03/STR~|~Minor bridge work > 10' to 20' span.~|~~|~4C2A7B247E4C77F82AD70ADDBB98CBA6A836F387 110678~|~1~|~1~|~01/STR~|~Resurfacing~|~~|~C348E5049BD6523FD39E654CD279A3008CBA9CC2 97222~|~1~|~1~|~01/ENH~|~New bake path~|~01 - New Construction~|~75A40ECA55F0FD8E49616A2CA28F164FCE7430DA 111159~|~1~|~1~|~01/NHS~|~Replace temporary structure HAS-151-0767 (SFN 3402135) with a new structure.~|~04 - Reconstruction - No Added Capacity~|~F5DD786A701D051BFB9341395C14D682185E5E91 98316~|~1~|~1~|~01/IMS~|~Districtwide fast dry pavement marking contract~|~44 - Other~|~F8310F4B44EF2614B8ADFFCD2E1526167998291F 122338~|~1~|~1~|~01/MPO~|~Plan split for MPO funded resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~B70B625523290C632C1AA3E68D7568962E081C24 122338~|~1~|~2~|~02/SAF~|~Plan split for ODOT Special Solicitation using safety funds for work on roundabouts and bike lanes.~|~21 - Safety~|~DA8B91D702ABB0E8500B25A3F1145E05F0E97610 99203~|~1~|~1~|~01/IMS~|~SFN 1204351 - CLA-70-12.08 (R) - Bridge replacement-mainline profile adjustment-MSE walls.~|~10 - Bridge Replacement~|~4EFAD28B6425A6FE44A2600F2C6351B5EF120183 99203~|~1~|~2~|~02/BRO~|~BR eligible - SFN 1204327-CLA-70-12.08 (L)-bridge replacement-mainline profile adjustment-MSE walls.~|~10 - Bridge Replacement~|~AD216AAB56128D16E3669AA033CA493F681A991E 99203~|~1~|~3~|~03/IMS~|~Resurface IR 70 with Item 446 asphalt concrete on CLA IR 70 10.55 to 13.98~|~05 - 4R Maintenance - Resurfacing~|~E26FDA6E29C3426852D1CD8369A1D47A98B59C68 110577~|~1~|~1~|~01/STR~|~Culvert repair throughout the district.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A32841F497777203A73266271446F2558937BF95 102585~|~1~|~1~|~01/NHS~|~All work on US 224 in Hancock County from CR140 at 10.75 to the WCL of Findlay at 11.54; from just west of TR 212 at 17.42 to TR 242 at 18.43; and it Putnam County from the bridge just west of Glandorf at 19.26 to the WCL of Ottawa at 19.89.~|~17 - Construction Engineering~|~47773EEBBE5C27895F99BC63AF987F86FAFC5552 102585~|~1~|~2~|~02/S<2~|~All work on US 224 in Hancock county from SLM 18.43 to the Findlay Urban Area boundary at CR 248 SLM 19.94 and in Putnam County from 18.33 to 19.26.~|~17 - Construction Engineering~|~65A8D1E683524BE45CFB2F8246DC9EEC98BA8293 102585~|~1~|~3~|~03/STR~|~On US 224 in Hancock County from 7.26 to 10.75 and from the Findlay Urban Area boundary at CR 248 SLM 19.94 to 26.04; and in Putnam County from 12.13 to 18.33.~|~10 - Bridge Replacement~|~8E78D0206C7CE1AFFA68B12F70E13D0854E8A44A 107144~|~1~|~1~|~01/NFA~|~Industrial Parkway 500 foot extension~|~01 - New Construction~|~5B982C0ED876D858CBEFD64A6EDF85C6E0F1F53F 95865~|~1~|~1~|~01/NFP~|~@ SLM 2.84~|~44 - Other~|~906BDE2FEA5A63E31479ACD733AC654E896B3A3A 119860~|~1~|~1~|~01/ENH~|~Monroe County SR 78 Multi-Use Path Phase 1~|~28 - Facilities for Pedestrians & Bicycles~|~A0B00A5CA0817629515AF445743491E042EFA85D 99666~|~1~|~1~|~01/NHS~|~Resurfacing work funded with 80% federal and 20% state dollars~|~05 - 4R Maintenance - Resurfacing~|~E1F675D3A1293AC0DE0CA1C8DB80DE8424E24B3F 82407~|~1~|~1~|~01/BRF~|~Replacement of Bridge SFN 7841914 over Big Yankee Creek~|~10 - Bridge Replacement~|~EFAEA17307FEC8C4593F8D051146F039A7BD8AD8 92355~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~82283CBFDF5963350D4EC1746CBE9AA6D2590F56 105903~|~1~|~1~|~01/S>2~|~Plan split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~CC6316349FAEEA12E1025D41A5A8190E8F778A61 93483~|~1~|~1~|~01/IMS~|~Type 1 Emergency - Work at culvert location prior to pipe liner~|~44 - Other~|~026B4DC81FF9DC17E7E8F5B9D2AA7A0F1796A1D3 106650~|~1~|~1~|~01/NFA~|~Replacement of the Baker Road Bridge in Athens at mile marker 8.30.~|~01 - New Construction~|~B7B09C2EC25269125660CF91862E1F0CBDC5044F 115276~|~1~|~1~|~01/NFP~|~ODNR project for a landslide repair on Road 10 at the HOC Tar Hollow State Park.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~637C5AA85DEE38019BFD925F0118A3EEE20CDECF 101258~|~1~|~1~|~01/STR~|~Split for paving work~|~99 - State Preventative Maintenance~|~BD7186A245A33E44BF476E717823B85B26A73FF2 102461~|~1~|~1~|~01/STR~|~Minor Rehab of pavement on SR 93 in TUS county~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F778E0C179136A914CBE21728CE0783DD8F60B4C 119855~|~1~|~1~|~01/S>2~|~Roundabout improvements along SR161 from Busch Blvd to Ambleside Dr~|~21 - Safety~|~B62F4ACE64505EC57217CE31C8A91DB6DA42095A 119855~|~2~|~2~|~02/S>2/COC~|~100% locally funded items, such as Columbus required SCPs (stormwater control practices).~|~21 - Safety~|~83DB6555928FD08A5DA049C94E401582F347CCBE 98305~|~1~|~1~|~01/STR~|~Mine subsidence remediation project. VIN 56 7.87. Type A Emergency project funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B5DA38F8DAAAD4F1A25DEB5B44F9634992774BB7 117275~|~1~|~1~|~01/NHS~|~Pavement work on NHS locations.~|~04 - Reconstruction - No Added Capacity~|~AD1D6A1B1CA09618109DC5A6703F3EAFA61F7E65 117275~|~1~|~2~|~02/NHS~|~Plan Split for the BUT-4 location the resurfacing south of the RR bridge ~|~05 - 4R Maintenance - Resurfacing~|~64CF86FEB316B47CED7C3C3638D3F0DAFB578507 117275~|~1~|~3~|~03/NHS/SWWD~|~Plan split for utility improvements funded by Southwest Regional Water District (SWRWD).~|~43 - Utilities~|~A373606389FF82D08EDB8CD6B3E790A961865B10 109027~|~1~|~1~|~01/STR~|~ASD SR 0060 27.40 and ASD US 0042 15.05 Culvert Replacements.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~927A7747B4E9012B791CA6722EFD82F15E1828D2 88789~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~33290978BED792450B245DD013E743243115DFF4 95190~|~1~|~2~|~02/S<2~|~For CR D from SLM 10.82 (CR-16) to SLM 13.81 (CR-13)~|~05 - 4R Maintenance - Resurfacing~|~3509F7AF8AD72423E9E0CCBCC7FEA4579C9B96E0 95190~|~1~|~1~|~01/STR~|~CEAO funded CR-D and CR-3~|~05 - 4R Maintenance - Resurfacing~|~F076454ACE012AEC9D51024062C4015655BBD1B7 107207~|~1~|~1~|~01/SAF~|~Construction of an EB right turn lane on HOC 33 0.40. Safety project funded 90 federal/10 state.~|~21 - Safety~|~4B1206CA32862D38D0AFB6D4341051D83670D54E 123092~|~1~|~1~|~01/BRO~|~Replace bridge BEL-9-19.500 (SFN: 0701211) carrying S.R. 9 over Wheeling Creek.~|~10 - Bridge Replacement~|~E993E614B65414EC8D85F73C0A5389B94E8843F8 99939~|~1~|~1~|~01/S<2~|~SCI US 23 1.63 (Kinney Lane)~|~21 - Safety~|~8B974F179A5AE5B03CA2AEF76A0C5625D4B27FD8 99939~|~1~|~2~|~02/SAF~|~SCI US 23 1.63 (Kinney Lane)~|~21 - Safety~|~A81A4788D5072F3801BFF4C7020AFFFF6E78DE5E 99998~|~1~|~2~|~02/NHS~|~Split for culvert work on SR-176~|~44 - Other~|~995D40AB68D86D976D8D6733FCFB0E223410866A 99998~|~1~|~1~|~01/IMS~|~Split for culvert work on the interstate system~|~44 - Other~|~346540F872BE4B98328F2D6D4A3F318014D8C120 111603~|~1~|~1~|~01/NFP~|~Plan split 1 for bridge work~|~13 - Bridge Rehabilitation~|~8E3758BAD5DD49B59F527695E262A84A7A02931D 104776~|~1~|~1~|~01/BRO/FCEO~|~"01/BRO/BR/FCEO" - Fairfield County Engineer - replacement of deficient bridge on CR63 - Approved CEAO FY22 - Fed Max $1,368,480~|~10 - Bridge Replacement~|~E969DB8865E6C82436AA591229C7E1B5B30BF8F8 84646~|~1~|~1~|~01/STR~|~2 Lane Chip & Seal ProjectADA-SR-136 20.360 to 25.140 O C 000 ADA-SR-247 18.170 to 23.980 O C 000 HIG-SR-138 0.000 to 7.030 O C 000 LAW-SR-141 16.370 to 22.940 O C 000 ~|~05 - 4R Maintenance - Resurfacing~|~04263D9F7E8C28F85960BF62C8DD633A9CDFB22B 84646~|~1~|~2~|~02/STR~|~Deck Sealing on ADA SR 136 21.38 SFN 0103527LAW SR 141 19.64 SFN 4402758~|~13 - Bridge Rehabilitation~|~2034C604EE2BBF84FDF70AE082CEEA7B769A3E3E 124436~|~1~|~1~|~01/SAF~|~Construct sidewalks and pedestrian controls on SR 521 in Kilbourne~|~21 - Safety~|~E8F631567A187A535A0A80D925117F22303E39A8 91314~|~1~|~1~|~01/IMS~|~Paving southbound CD lanes from 41.40 to 43.18~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E22075376875C96ACB2DC2F1A9DAC865C9800056 105278~|~1~|~2~|~02/STR~|~Asphalt resurfacing work and pavement repairs in the Village of Richmond.~|~05 - 4R Maintenance - Resurfacing~|~2DCB5C1A646EA359696A3A109120F83CB286C3C4 105278~|~1~|~1~|~01/STR~|~Resurfacing SR 43 from the Village of Richmond to the Village of Amsterdam.~|~05 - 4R Maintenance - Resurfacing~|~216B8D06BE9AE9A5D685D4B35D5A13512ABC59C2 105278~|~1~|~3~|~03/SAF~|~Centerline rumble stripe work~|~21 - Safety~|~8E523AC649B69A218F3C16CB19E37E99886697C8 124329~|~1~|~1~|~01/NFA~|~Repair/replace the wash bay walls and ceiling at the Athens FSMF~|~44 - Other~|~B5936F4E9A5AD6AFE0F1634166C3A26A347965B2 116877~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~87582765342A4D8DA085E61140DEC4F8B82E600C 118121~|~1~|~1~|~01/NHS~|~Added plan split to build a turbo lane at the intersection of state Route 124 and state Route 32 in Pike County, a right-in/right-out at the intersection of state Route 32 and Tennyson Rd, and WB and EB turn lanes at state Route 32 and Gleason Rd.~|~21 - Safety~|~5E5C000078A7398A06BD15CCC52A08C1A5546E6C 112468~|~1~|~1~|~01/NFP~|~The Village is reconstructing approximately 1,000 feet of West Wall Street from North Walnut Street west to North Dix Street.~|~44 - Other~|~D805829B038A063CF660C8358CED09C82C5BCA24 97111~|~1~|~1~|~01/BRF~|~The replacement of SFN6532195 and SFN6530486~|~10 - Bridge Replacement~|~78BB436C6D257A1A1E250D3BD1A48264B5A9B2E3 97896~|~1~|~1~|~01/S<2~|~CR 228 (OM 038) - Roadway widening project consists of revising the existing roadway from 2 lanes to 3 lanes (39' side).~|~03 - Reconstruction - Added Capacity~|~C93C3BFE234DE87941553DEF7659E734A651AF40 75436~|~1~|~1~|~01/NHS~|~Realigning State Route 59.~|~04 - Reconstruction - No Added Capacity~|~A909D1018D79FDED1857F88E41E662B22611BF97 75436~|~1~|~2~|~02/NHS/Akrn~|~Ineligible items.~|~04 - Reconstruction - No Added Capacity~|~0C972BEF896F9DC4828E942CCECEA4504B7FA49A 114403~|~1~|~1~|~01/IMS~|~Preventative Maintenance of bridge decks by cleaning them and then sealing them with HMWM resin.~|~47 - Bridge Preventive Maintenance~|~180BCDE2552D435DF9689A89160957994CA5CD29 105585~|~1~|~1~|~01/STR~|~Rural plan split: MAD-40-13.92-14.21 MRW-61-3.27-13.18 UNI-161-6.13-12.40 UNI-347-0.97-4.22~|~05 - 4R Maintenance - Resurfacing~|~1B5F1817313ED44FE9F9A88A9E3CD4ECD24E663D 100372~|~1~|~1~|~01/STR~|~Various locations~|~05 - 4R Maintenance - Resurfacing~|~6E8F5A3C10A898510AA2E2C2AC2EA1208C86BDEA 121967~|~1~|~1~|~01/SAF~|~Plan split for all roadway items associated with the construction of the roundabout~|~21 - Safety~|~DA1DB56FCFD66DEBE79E0120AA55608A1126DB61 121967~|~1~|~2~|~02/BRO~|~Plan split for bridge work associated with the WOO-199-2665 bridge replacement~|~10 - Bridge Replacement~|~D6A532A5A3B2736C10FFF7C80D4D2E254E50EFB0 115009~|~1~|~1~|~01/MPO/BEAV~|~Decorative hardscape enhancements to Colonel Glenn Highway from National Road to Zink Road. Replacement of deteriorating sections of sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~7531CF2306A52CD89C3B6A5FC1CED3AFA40F4551 84699~|~1~|~1~|~01/SAE~|~"01/SAE/PV/ " Safety Funding 4BC7 (100% State) - $1,972,592.27 CAP - Ramp reconfiguaration to reduce the number of accidents due to the short radius of the existing ramp configuration.~|~17 - Construction Engineering~|~AFE1D1A4920A1367340EA7E113A5F8B131202EF4 84699~|~1~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Backwall rehabilitation on 1) 4503694 LIC IR70 15.72 Intersect: Buckeye Lake Overflow; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=61.9 DSR=7; 2) 4503724 LIC IR70 15.72 Intersect: Buckeye Lake Overflow; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=62.9 DSR=7;~|~13 - Bridge Rehabilitation~|~B90975F2B4A4C2311AE3A5BB1DEAA274D9BEBB4B 84699~|~1~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on: 1) 4504712 LIC SR79 4.19 Intersect: Over Buckeye Lake Overflow; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=60.4 DSR=6: 2) 4504771 LIC SR79 4.53 Intersect: NE Ramp Over Overflow; BR Eligible for Rehabilitation: Length=99 SD/FO(1) SR=59.6 DSR=5:~|~13 - Bridge Rehabilitation~|~EB66AA4045255399E71D8A1254CDAF23560965AA 103846~|~1~|~1~|~01/STR~|~ER slip repair on PIK CR 50 3.32 (PIK-005)~|~~|~508EE1C17AAB7969369BA28176427174BF58739C 103026~|~1~|~1~|~01/IMS~|~Installing tower lighting at the I-90/SR 534 interchange.~|~21 - Safety~|~B3E20059B6226900E7727E469A8CE2C269C66C23 112855~|~1~|~1~|~01/NHS~|~D09 Smoothseal FY27~|~05 - 4R Maintenance - Resurfacing~|~5D43B44C8A54CFC89DE0F3E8B7ED2FE9616150A2 117461~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH TR 83 1.40, SFN 0549452 and ATH TR 461 0.01, SFN 0547867.~|~10 - Bridge Replacement~|~4629CA190455178BD112A9834E5225638F4EC4E0 83643~|~1~|~1~|~01/S>2~|~80/20 fund split using federal Urban STP funds for SLM 19.14 to SLM 21.94. East of 21.94 is rural.~|~05 - 4R Maintenance - Resurfacing~|~2F6E77CAC61A431B8FE18ABCB74948E64455CD8F 83643~|~1~|~2~|~02/STR~|~80/20 fund split using federal Rural STP funds for SLM 21.94 to SLM 23.94. West of 21.94 is urban.~|~05 - 4R Maintenance - Resurfacing~|~BA3B2D2510B51B37D80BFA1D362FE915903B2993 110810~|~1~|~1~|~01/BRO~|~Split for bridge deck replacement work~|~13 - Bridge Rehabilitation~|~B6B07EBA1A1B1239E41A2826796F13832C5E1938 86919~|~1~|~1~|~01/BRO~|~SFN 7434464, SEN-CR38-9.32 over Sandusky River.~|~10 - Bridge Replacement~|~87B79AD1F16B39886829BCBE917272641FD93BBC 114848~|~1~|~1~|~01/STR~|~Rural portion of SR 665~|~05 - 4R Maintenance - Resurfacing~|~345EF41AB2CC4344BE699006541454D1CBC05325 104252~|~1~|~1~|~01/NFP~|~All work to replace the bridge. State Exchange Funding SAC 4C87 with the 5% match provided by Allen County.~|~10 - Bridge Replacement~|~13D2C2C1E8C8B8A31436EDDAF7168837163F878F 119905~|~1~|~1~|~01/NFA~|~NEVI Round 2 30-D~|~63 - Electric Vehicles & Charging Infrastructure~|~3EFF387FE20BB8DE13F4C9DB5060342F6C3B2EC1 93453~|~1~|~1~|~01/BRO~|~Bridge deck sealer treatment on SFN 7500602 SHE-IR-75 6.660 230.0~|~05 - 4R Maintenance - Resurfacing~|~1B038CC12D07CAF65F035B29FF6DD413BEECF048 93453~|~1~|~7~|~07/NFA~|~Bridge deck sealer treatments on: SFN 4604024 LOG-SR-638 1.74 SFN 4602447 LOG-SR-273 7.37~|~05 - 4R Maintenance - Resurfacing~|~7F1A6BB393647629A73E840C588B05F4F4929FE2 93453~|~1~|~2~|~02/IMS~|~Bridge deck sealer treatment on SFN 7502109 SHEIR00075**C : 9.960 SFN 7502133 SHEIR00075**C : 9.960 SFN 7502524 SHEIR00075**C : 17.07 SFN 0602345 AUGCR00190**C : 0.29 SFN 7502850 SHESR00119**C : 9.37 SFN 7502222 SHEIR00075**C : 11.49 SFN 7502257 SHEIR00075**C : 11.49 SFN 7502613 SHECR00029**C : 9.15 SFN 7501684 SHECR00008**C : 4.91 SFN 1203495 CLA-070-0016 : SFN 1205102 CLAIR00070**C : SFN 7502559 SHE-75-1707R.~|~05 - 4R Maintenance - Resurfacing~|~AADBD40325AA7B6BD02012340D2CEF2B78F3FE28 93453~|~1~|~6~|~06/S<2~|~Bridge deck sealer treatments on SFN 1902318 DARUS00036**C : 12.28 SFN 1902342 DARUS00036**C : 12.57 SFN 1902288 DARUS00036**C : 12.28 SFN 1902377 DARUS00036**C : 12.57 SFN 5400325 MERSR00029**C : 14.29 SFN 5400341 MERSR00029**C : 14.29~|~05 - 4R Maintenance - Resurfacing~|~C3019DA832EFE4C1E6CE60B759C57D6FD9F83D3A 93453~|~1~|~5~|~05/STR~|~Bridge deck sealer treatments SFN 1900463 DARSR00047**C 6.49 SFN 7501390 SHESR00066**C 13.03 SFN 7500424 SHESR00047**C 3.97 SFN 5400759 MERSR00049**C 7.84 SFN 7503423 SHESR00705**C 3.07 SFN 1903055 DARSR00502**C 3.32 SFN 7500777 SHESR00047**C : 21.36 SFN 4602560 LOGSR00274**C : 3.19 SFN 1904124 DARSR00705**C : 15.99 SFN 7503105 SHESR00362**C : 1.52 SFN 7501137 SHESR00066**C : 4.84 SFN 7500556 SHESR00047**C : 11.49 SFN 1904213 DARSR00721**C : 4.40 SFN 4601866 LOGSR00117**C : 3.64 SFN 5402689 MERUS00127**C : 18.95 SFN 1902261 DARUS00127**C : 1.37 SFN 1902679 DARUS00127**C : 22.02~|~05 - 4R Maintenance - Resurfacing~|~CA83C286E185428B1C6AB17DA14A82481D2DB274 93453~|~1~|~3~|~03/NHS~|~Bridge deck sealer treatments SFN 4601440 LOGUS00068**C : 0.400 SFN 4600576 LOGUS00033**C : 14.68 SFN 4603370 LOGSR00347**C : 0.17 SFN 4602935 LOGSR00292**C : 0.30 SFN 4600606 LOGUS00033**C : 14.68 SFN 4601890 LOGSR00117**C : 6.71 SFN 5700515 MOT-004-1731 SFN 5704103 MOT-049-0353 : SFN 4601564 LOG-68-0979~|~05 - 4R Maintenance - Resurfacing~|~DA891D4A1E6BAC748BA49FE268923DD289BA0CA7 93453~|~1~|~4~|~04/BRO~|~Bridge deck sealer treatmentsSFN 1902520 SHE-SR-47 14.420SFN 7500637 SHE-SR-47 14.420~|~05 - 4R Maintenance - Resurfacing~|~EDC6A68E6B63318ADDC5ACB858854CE2456ED064 91899~|~1~|~1~|~01/S<2~|~Federal Urban STP funds from the Small Cities Program. The 20% local match provided by the Village of Ada.~|~04 - Reconstruction - No Added Capacity~|~37DA96363A75394032003E0621AD816A272D2CDD 121661~|~1~|~1~|~01/BRO~|~Replace bridge~|~10 - Bridge Replacement~|~B522CD634214EA5047D0698D9F76A8A88C713FD6 86870~|~1~|~1~|~01/IMS~|~Replace superstructure on two bridges (BEL-70-2663A, SFN 0703001 and BEL-70-2663D, SFN 0703060) and replace deck on another brideg (BEL-70-2663, SFN 0703036). Substructure repairs will be performed on the first two bridges as needed.~|~13 - Bridge Rehabilitation~|~00FC7C24A0F91D914235BCCF29E7BDA91582FC3F 86870~|~1~|~2~|~02/IMS~|~Added funding event for on-going services to be provided by Consulatnt during Construction.~|~17 - Construction Engineering~|~6EB7267FDA2D90AF443701C4412AA96892A91F18 105052~|~1~|~1~|~01/NFA~|~Repair of MAR-100-1.45 (not on the Federal Aid System)~|~13 - Bridge Rehabilitation~|~91248ACC7EB0206E4DDA7B984AD6D301D7F0DDDC 94008~|~1~|~1~|~01/NFP~|~Plan split for all work~|~44 - Other~|~75BAC7B398D9BAFEB4DE7CA6DCFDCDF19FE2DCDB 10379~|~1~|~1~|~01/STR~|~Brdg replacement. 4401743 LAW SR93 15.39 Intersect: Pine Creek0.25 MI. S OF TR.199. 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~9DF312DD104C116311B66E40F6523344F28BEDF1 105663~|~1~|~1~|~01/STR~|~STP Rural. District Preservation Programs funds.~|~05 - 4R Maintenance - Resurfacing~|~7002D494DEA9BF9947CE5EFA74803EEA8A02CF2A 109706~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4CP7 (100% State) - No CAP - Ding-N-Dent Guardrail repair District Wide~|~21 - Safety~|~2275C3792504007FA9AC403A2265BB0768BF9748 113645~|~1~|~1~|~01/SAF/ZANE~|~City of Zanesville Safety Program - 4HJ7 (90% Federal) / 4BC7 (10 % State), 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Safety improvements along Pine Street at three signalized intersections: West Main Street, Pershing Road, and Eppley Avenue.~|~21 - Safety~|~1B72D2F00CA0EC2A84A849E7E26E29665BA27A72 127045~|~1~|~1~|~01/SAF~|~Partial safety funding was awarded for curb ramp work only.~|~28 - Facilities for Pedestrians & Bicycles~|~3C5CDA18A9B62E8A0AF57F0C27B18FEC21F6B498 92996~|~1~|~1~|~01/NHS/MVER~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~25DC8F387A2B431BDB137806508EE3B21B08C5C4 92996~|~1~|~2~|~02/STR~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~A62298E16C8FFCAD1F4CA589F1311722DD22EA40 91451~|~1~|~1~|~01/NHS~|~Pavement project using concrete pavement repair (CPR) treatment. GAL 7 5.21-10.21. Federal/State 80/20% funded.~|~05 - 4R Maintenance - Resurfacing~|~D2B30A16B5063F9E6D613AA2531EACA4AA56BFAB 110528~|~1~|~2~|~02/NHS~|~Pavement rehab Plan split for Rural pavement~|~04 - Reconstruction - No Added Capacity~|~92D18CEC0F43B79F0A9085B13ED90E278101EA0F 110528~|~1~|~1~|~01/NHS~|~Pavement Rehab plan split for Urban area~|~04 - Reconstruction - No Added Capacity~|~120302EBBAEA8EAE1C4B212FBD4E6F9D16FBBAAD 89286~|~1~|~1~|~01/S<2~|~Widening and construction of turn lanes on Farson St in City of Belpre. PE funding by City, Construction Funding by ARC Local Access Roads. Funding priority: 01 80/20 Federal/Local 4D37/4BG6, 02 100% Local 4BG6, 03 100% Local 4BG7.~|~21 - Safety~|~23FC8F2E33440DE83795CF7B47965265B3F950FD 103890~|~1~|~1~|~01/NFA~|~The TID is constructing the Main Street Emergency Steamboat and Shoreline Protection Project including, but not limited to , roadwork improvements by constructing a longitudinal dikes and rock buttress at the most severe locations along Main Street.~|~01 - New Construction~|~88E44FA6DE1982D3E6C2E8A616B4A68A76C34C05 92336~|~1~|~1~|~01/NFP~|~Replace foot bridge and drainage structures under SR VIN 349 0.280. ODNR to let project. ISTV/agreement will be used to transfer ODOT funds to ODNR. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B40881EA60F1B26EA961E544E3DCEAB54F4C3490 124910~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~CDE9D4E2FD2BC43076E9C58E07BED8309E79362C 114387~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/PV/ - 80% Federal, 20% State~|~05 - 4R Maintenance - Resurfacing~|~993ED077E8B1311B9AF631AEDC57599281FE5B42 113438~|~1~|~1~|~01/NHS~|~Minor bridge rehabilitation on MEG 33 8.66 R, SFN 5300819. Type C Emergency.~|~13 - Bridge Rehabilitation~|~814101C27D4D4288EBD914C3269337273B5CFCA3 102544~|~1~|~1~|~01/S>2~|~plan split for work in the large urban sections of BUT-126 & BUT-128~|~05 - 4R Maintenance - Resurfacing~|~189B65F53CFBA8C547EFB05B4C168A8FCBE08450 102544~|~1~|~2~|~02/STR~|~plan split for pavt work on the rural sections on BUT-128 & HAM-128~|~05 - 4R Maintenance - Resurfacing~|~9F7AB0A1650079B775743D7727182D43F02F8994 102544~|~1~|~4~|~04/S>2~|~Plan Split for the 80/20 items on the sections of BUT-128 fully inside the City of Hamilton. BUT-128: 7.5-7.57 + 7.74-8.33 + 8.49-8.54~|~05 - 4R Maintenance - Resurfacing~|~6B82D5238763863243D8F5372D4A26FA5A7D7ECC 102544~|~1~|~5~|~05/S>2/HAML~|~Plan Split for the 100% items on the sections of BUT-128 fully inside the City of Hamilton. BUT-128: 7.5-7.57 + 7.74-8.33 + 8.49-8.54~|~05 - 4R Maintenance - Resurfacing~|~8A447DA9B2A017DBB38DB03742C408575DC8C9E8 102544~|~2~|~3~|~03/S>2~|~Part 2 only: Plan Split for slide correction near Pryamid Hill park entrance~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D9B6CE0FAF2C42FDBB83424B93D7E450A8D8CEA3 126136~|~1~|~1~|~01/STR~|~Resurfacing on BUT-127~|~05 - 4R Maintenance - Resurfacing~|~9DF7D5423BAF01E085C962C673C410D323E84C28 95557~|~1~|~1~|~01/MPO~|~80/20 federal/local split using MPO STP funds for the bridge repair of SFN 1870025 (Prospect Avenue), SFN 1869442 (Huron Road), SFN 1868411 (West 6th Street), SFN 1868403 (West 3rd Street) and SFN 1867245 (West 2nd Street).~|~13 - Bridge Rehabilitation~|~7F777B2FACC645DCEBD80E62DD93F9348564C73A 95557~|~1~|~2~|~02/MPO~|~100% local participation on work items non-eligible for federal funding.~|~13 - Bridge Rehabilitation~|~AB3E64AAD3E318CF6046E2A0529BB2D7C945CDCF 83934~|~1~|~1~|~01/STR~|~Rural~|~17 - Construction Engineering~|~AD99E68FAFC090A04D87257BB922819E45E9C7AE 83934~|~1~|~2~|~02/S50~|~STP 50,000 - 200,000~|~05 - 4R Maintenance - Resurfacing~|~53BD38C2A301DE4CA5CB05BEEECD7741673BD6B5 105861~|~1~|~1~|~01/IMS~|~Replacing structures >20' span.~|~10 - Bridge Replacement~|~D0B2F6F907B352D9FA0C41E4DA931DAA5C3287D7 105861~|~1~|~3~|~03/NHS~|~Culvert replacements and repair.~|~04 - Reconstruction - No Added Capacity~|~A8BC55425BC50B6BE5B16E39292A6715E6365D5B 105861~|~1~|~2~|~02/IMS~|~Replacement of sign support structures and extrusheets at the IR77 and SR21 interchange.~|~44 - Other~|~35FEFCF897BD6F286426D2FCC09914E76114C7B2 98221~|~1~|~1~|~01/NFP~|~Crack sealing on routes throughout District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AE4BC608DC98FF2BC7223927520B8C220937B451 121965~|~1~|~1~|~01/NFA~|~Stabilize & Resurface Existing Roadway CR 48 mm 0.00 to 1.86~|~05 - 4R Maintenance - Resurfacing~|~FE23A32C51935ADAD5A527CCA892F348CBB2743A 104510~|~1~|~1~|~01/BRO~|~work eligible for CEAO LBR funding.~|~10 - Bridge Replacement~|~B1973CE7A8E712181081CAC426EF628BE54849DE 120337~|~1~|~1~|~01/STR~|~Culvert replacement project. VIN 278 2.79 (CFN 1811036). Funded 80% Federal/20% State.~|~04 - Reconstruction - No Added Capacity~|~EE708A9DA561A5DEA8E5EF0B38DF026AF097FA92 94054~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities - 4MA7-005 (100% State) - No CAP - Construction of a new Salt Dome at the District 5/Licking County Headquarters complex~|~01 - New Construction~|~4DFA2A51C0BAEF69562B610CC0E017F56D4E5515 117898~|~1~|~1~|~01/NFP~|~Split for signal work at the intersection of IR90 and SR 528~|~21 - Safety~|~4C44A58103E4198BFCC595146C386B56EDEE15BD 117898~|~1~|~2~|~02/NFP~|~SPR funded work - wrong way bump pad~|~21 - Safety~|~DA1D3117EEB18FBD232E8BCD2EFBB947234AFFAA 118153~|~1~|~1~|~01/STR~|~Slide repair and culvert replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DB4FDB0EB155F4E7A2AE0B8EE2CB72E75C8A4518 101699~|~1~|~1~|~01/SAF~|~Intastallation of sign on the State Route 8 bridge in the City of Cuyahoga Falls, Summit County, Ohio.~|~~|~F004B58C5799FAF6C0F02B4AB6B88E47A0503348 125736~|~1~|~1~|~01/NHS~|~Bridge work throughout District 5.~|~13 - Bridge Rehabilitation~|~361046F3D8AC5F6F657756E64C2BA64363D0050E 114146~|~1~|~1~|~01/NFP~|~Crack sealing on various routes in D9.~|~99 - State Preventative Maintenance~|~A602387FAE3FE1CE98035F25E87CFC7928B063A7 88936~|~1~|~3~|~03/S>2~|~Resurfacing STA SR 687 from 5.53 to 5.70 (Ramp I).~|~05 - 4R Maintenance - Resurfacing~|~57910AB9626DC45BCFA558C67D1155DE214F36BF 88936~|~1~|~2~|~02/NHS~|~Resurfacing STA US 62 from 22.19 to 22.60 (includes Ramp H).~|~05 - 4R Maintenance - Resurfacing~|~26BCF6380F0F87C24816E3516D15BBFA12EF5418 88936~|~1~|~1~|~01/IMS~|~Resurfacing STA IR 77 from 11.84 to 12.80.~|~05 - 4R Maintenance - Resurfacing~|~7AB1E6F6186CD1EAEB0C29E2B2161D6A2D171C53 88936~|~1~|~4~|~04/IMS~|~Minor bridge work >20' span.~|~13 - Bridge Rehabilitation~|~E873A9BAFC181A5E8990AF8FD99C036ED538D5FC 96713~|~1~|~1~|~01/STR~|~SFN 7200811, SAN-6-23.58~|~13 - Bridge Rehabilitation~|~8EF4080CA9F685F15188E136E32ED4A2DD0990EC 98043~|~1~|~5~|~05/STR~|~STP Rural Bridges FRA-665-2.14 SFN 2516810 FRA-665-2.53 SFN 2516829 FRA-665-3.26 SFN 2516888 FRA-665-5.28 SFN 2516934~|~13 - Bridge Rehabilitation~|~5AF87CA8A5B2D226D46B294E9FB7BC4DFEF8E5C9 98043~|~1~|~4~|~04/S>2~|~Urban paving (Grove City) SLM 10.97 to 10.98 SLM 11.61 to 11.89 SLM 12.24 to 12.55 SLM 12.59 to 13.48~|~05 - 4R Maintenance - Resurfacing~|~AFE7DFE3369B8C3B64F753C059CDBDAA6852FC9C 98043~|~1~|~6~|~06/S>2~|~STP >2 Bridges FRA-665-10.08 SFN 2517027 FRA-665-11.93 SFN 2517043 FRA-665-14.00 SFN 2517116 FRA-665-12.62 SFN 2517078~|~13 - Bridge Rehabilitation~|~C86192BE2E906C43E189936EDC00F425FCF80201 98043~|~1~|~3~|~03/S>2~|~Pavement within Columbus UA but outside Grove City SLM 7.3 to 8.38 SLM 9.89 to 10.97 SLM 10.98 to 11.61 SLM 11.89 to 12.24 SLM 12.55 to 12.59 SLM 13.48 to 14.52~|~05 - 4R Maintenance - Resurfacing~|~E73B72249FB7C6363ECB4E73C54CB0413D05B1ED 98043~|~1~|~1~|~01/STR~|~STP Rural pavement SLM 0.00 to 3.31 and 5.18 to 7.39~|~05 - 4R Maintenance - Resurfacing~|~EAE204EE5A8E29D79E3694856E958563E11B5635 98043~|~1~|~2~|~02/S<2~|~STP <2 pavement within the Darbydale UA~|~05 - 4R Maintenance - Resurfacing~|~F75A69530F2A645FDAC3D65A92F2FC49FCB6B19E 106652~|~1~|~1~|~01/NFA~|~Replace bridge over Bokes Creek~|~10 - Bridge Replacement~|~95E8AE9C336D8AF98C7A53DD7DDA7834A152F455 95988~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (1100% State) - No CAP -Resurfacing on portions of Per-SR 37-(0.00-8.59)~|~05 - 4R Maintenance - Resurfacing~|~A415150D5523AD896AE42754DFB67A4C3D3D28C6 108084~|~1~|~1~|~01/MPO/CUYA~|~Widen Portage Trail Extension West to construct a two-way left-turn lane from Albertson Parkway to State Road in Cuyahoga Falls. Includes 10' and 8' wide multi use trail/sidewalks and drainage system.~|~21 - Safety~|~C49C17367AE4112230939CB23E0D26652DAF527E 107973~|~1~|~1~|~01/NFP~|~FY 2019 Fence repair/replacement project.~|~44 - Other~|~1A4939965EDDA7D559510C519406003204BD3832 126599~|~1~|~1~|~01/NFA~|~Rehabilitation of bridge (SFN 4202740) over Dowd Creek on SR 205 in Knox County.~|~13 - Bridge Rehabilitation~|~6D353BE7F315CAD5378B8019E01752EFE3E27F4F 113314~|~1~|~1~|~01/SAF~|~Split for traffic signal work.~|~22 - Rail/Highway crossing~|~956994981223C49FDB1E7C6CD1501CC43C115F8A 100417~|~1~|~1~|~01/IMS~|~100% state funded split for approach work~|~99 - State Preventative Maintenance~|~608EFD613D65B1CC9A3AB1E9FC5BACC2C35F9714 114673~|~1~|~1~|~01/IMS~|~Rehab/repair culverts~|~04 - Reconstruction - No Added Capacity~|~441591C9ED13F432046A4106A7448C22B9795895 114673~|~1~|~2~|~02/NHS~|~Rehab/repair culverts.~|~04 - Reconstruction - No Added Capacity~|~D0F8B2539EAA396CCD883D241BB5FAB4313B842B 114673~|~1~|~3~|~03/S>2~|~Repair/rehab culverts.~|~04 - Reconstruction - No Added Capacity~|~DE20D0C6C46BDD7889B3647D59267245B7E4064D 121615~|~1~|~1~|~01/CMQ~|~Plan Split for MPO CMAQ funded scope~|~28 - Facilities for Pedestrians & Bicycles~|~281C6C9282708B49706CBABB8AC55E31EB9D4F8F 101181~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 32 9.73-9.79. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~4EFB05F5674EED0D8912216F6F5A22C476DFD0EB 101181~|~1~|~3~|~03/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 32 9.79-10.45. NHS route funded 80 federal/20 local in the City of Belpre.~|~05 - 4R Maintenance - Resurfacing~|~A3183B57B5D9A3FE2EB155C2474C071A0249556D 101181~|~1~|~4~|~04/NFA~|~Resurface Veto Lake parking lot/road with 100% State ODNR funds. Work includes replacing stop blocks and pavement marking.~|~44 - Other~|~AE0FEA24E64F20A8CC7C714F2BB28B0FE78419FD 101181~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 339 8.57-13.57. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~4F364FE3801038AC51BCB430490010E23027F61B 126566~|~1~|~1~|~01/NFA~|~All resurfacing work not on the federal aid system. ~|~05 - 4R Maintenance - Resurfacing~|~1E9207FB17E8B4E4E753BB634931D2BECFA7FBEB 126566~|~1~|~2~|~02/S5K~|~All resurfacing work within the STP 5,000-49,999 category. This includes CR 144 from SLM 0.00 to 0.759.~|~17 - Construction Engineering~|~B2CB153CD8A9C07E691465039BED3B9968E213D0 98985~|~1~|~1~|~01/MPO~|~Kinsman Township sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~F9B33E32641FBB63552F3A7D136BE717EF55FBCE 109170~|~1~|~1~|~01/SAE~|~Replacement and upgrades to existing guardrail and bridge and anchor assemblies on various county roads in Greene County, OH.~|~21 - Safety~|~4F2F897D16A909891E3C8B7B62E123128D39CE28 108009~|~1~|~1~|~01/NFP~|~All locations.~|~21 - Safety~|~E82382357BA37D2137E2EB8EB63918CF3B4B7B5C 110986~|~1~|~1~|~01/MPO~|~Safety and NOACA work~|~03 - Reconstruction - Added Capacity~|~07998E0342BC8518CD2752CD2354F1E6AE7982C4 81058~|~2~|~2~|~02/NHS~|~This is for part 2~|~10 - Bridge Replacement~|~33D4BE62B287E0F138C99C246243A1019174ECC7 81058~|~2~|~3~|~03/NFP~|~For ineligible items of part 2.~|~10 - Bridge Replacement~|~8DD863FBB6B7D908BD5D38BEB54DBD0934D65ECC 81058~|~1~|~1~|~01/NHS~|~4800362 LUC SR2 21.1 Intersect: Otter Creek~|~10 - Bridge Replacement~|~EBD2B103778D03CFAEAF8F27F15BAF76FA6716D7 95850~|~1~|~1~|~01/MPO~|~Resurfacing of CR-564 (Robinson Road) from Wilson Avenue to Struthers Coitsville Road. Resurfacing of Warhurst Road (CR-573) from SLM 0.00 to SLM 0.34 and Tenney Avenue from SLM 0.00 to SLM 0.95, in the City of Campbell, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~2C1D3D457568C10781D0F859E24E2F2D256487EA 96076~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for salt storage building and loader storage building at the proposed site for new Alexandria OP in Licking County at SR 37/SR 161 interchange - (Lic-37-11.81)~|~~|~2DA1A9A92DE2D11097A2244A955CB5B9D03E5918 122505~|~1~|~1~|~01/STR~|~All work included in this split.~|~~|~05AEEEC889E362D1E9E3181EF3099233F71F37A7 118514~|~1~|~1~|~01/MPO~|~Federal items~|~05 - 4R Maintenance - Resurfacing~|~B01969D9CEBB0559613746012A0F44B038D4A3BA 118514~|~1~|~2~|~02/MPO~|~Federally ineligible items.~|~05 - 4R Maintenance - Resurfacing~|~523B9EB7EFF5F7EDF3A53243EBDECA7A0D76E901 98714~|~1~|~1~|~01/STR~|~Resurfacing of MAH-US 62 from 1.01 to 7.41 and MAH-SR 630 from 0.88 to 2.56.~|~05 - 4R Maintenance - Resurfacing~|~4B9B17D7D0D0736E6F2F5A27BB940F9E464734EE 98714~|~1~|~2~|~02/S>2~|~Resurfacing of MAH-US 62 from 7.41 to 7.61 and MAH-SR 630 from 0.00 to 0.88.~|~05 - 4R Maintenance - Resurfacing~|~EFE7212C445ACB79D7440B113564185F74EF47E6 98714~|~1~|~3~|~03/S<2~|~Resurfacing of MAH-US 62 from 0.00 to 1.01.~|~05 - 4R Maintenance - Resurfacing~|~EA0D96FCE0643FDE6356AF91CB997F6D8C554D33 98714~|~1~|~4~|~04/STR~|~Minor bridge work to linked structure >20' span.~|~13 - Bridge Rehabilitation~|~8F6C9CA3F962911E250CD43C15537DEA3EDD1613 124065~|~1~|~1~|~01/NFA/COS~|~Rehabilitation of structure (SFN 1630024) on Coshocton County Road 28. ~|~13 - Bridge Rehabilitation~|~1B3F84DAD5557DCC261DABA63D48F6A8D55786A9 101853~|~1~|~1~|~01/ENH~|~Transportation Alternative Program funded construciton at 95% federal TAP/5% local.~|~28 - Facilities for Pedestrians & Bicycles~|~B5F2CC562F5948226B0EB17811E036FEC178857D 103163~|~1~|~1~|~01/MPO~|~The construction of the multi-purpose trail eligible for MPO Enhancement funds~|~28 - Facilities for Pedestrians & Bicycles~|~7296BDDD7E28DD704314FD08E8C3E7E4DE7B564B 103163~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work not eligible for MPO or ODNR funds.~|~28 - Facilities for Pedestrians & Bicycles~|~8B371E96F56924C9F7BB39664826B3A02BB7F81E 96724~|~1~|~1~|~01/NFA~|~Trumbull County West Farmington Outpost, build 3 Bay Cold Storage building with electric for block heaters~|~~|~262A67A2F01B251B19D03885F82657A72556B09B 116834~|~1~|~1~|~01/S>2~|~Split for bridge replacement work over various railroads~|~10 - Bridge Replacement~|~39F5A11E27C40CCE9B03A68BFEA0182828B72C76 118670~|~1~|~1~|~01/STR~|~MRG 78-10.96 165 ft landslide repair with drilled shafts. Funded 80% Federal/20% State GSM. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0035153E90EB396D95B0141F1D1156A0B6C35AE3 113295~|~1~|~1~|~01/NFP~|~Resurfacing in Kiser Lake State Park.~|~05 - 4R Maintenance - Resurfacing~|~E4202E4DB13F8F8CC71B28F0FBF9878553837125 119483~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing CEAO LBR Federal Funds at 100% up to CAP.~|~10 - Bridge Replacement~|~B1BAC8438464C9D14151BB7C165ABBB3444F575A 103804~|~1~|~1~|~01/NHS~|~Overhead Sign Truss Replacement at RIC -US-0030-14.09~|~44 - Other~|~86E4386C00B63264055628A58E0FEAFFF5D2C197 120177~|~1~|~1~|~01/SAE~|~Construct a Roundabout~|~21 - Safety~|~06824A885BCFFEDE32D64D37B137927BFF9C7DC1 100621~|~1~|~1~|~01/NHS~|~Minor rehabilitation of JEF-22 including asphalt overlay, pavement repairs, guardrail and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~E8F5304A2831CF6A903E2BD5A1BE488198B2A065 127135~|~1~|~1~|~01/SAF~|~100% funded with CEAO for installation of pavement marking on various county roads in Clinton county~|~21 - Safety~|~C690D23A37FBCFD20A3FF0CE7512648843E3DA4E 95324~|~1~|~1~|~01/ENH~|~Construction of a 10-foot wide multi-use bike path that will extend a local connection to the local and regional bikeway system~|~28 - Facilities for Pedestrians & Bicycles~|~67DFD680766D884C745089F3B58BFD6B0AF6D1AF 86463~|~1~|~1~|~01/NFA~|~Oasis Segment 1-Riverfront Transit Center to Boathouse: Provide rail on a combination of new alignment and existing track along with rail stations for connections at riverfront locations. (1 mile) Oasis Segment 2-Boathouse to US 50 in the Village of Fairfax: Provide rail on existing rail R/W controlled by SORTA, Upgrade structures as necessary, establish rail stations for possible neighborhood connections and connections at Lunken Airport and Linwood area. (7 miles) Oasis Segment 3-Village of Fairfax to Village of Newtown: Establish a new rail corridor along shared new highway to coincide with Highway Segment II/III, establish 2 multimodal transit hubs at US 50 and Newtown Road. (4 miles) Oasis Segment 4-North of the Village of Newtown to City of Milford: Provide rail on or along existing rail corridor, establish a station at Ancor Industrial Complex and multi modal station at the City of Milford. (5 miles)~|~~|~3E631F50C7D557AEAEBAF94D325CC8DBF52E6B69 93611~|~1~|~1~|~01/SAE~|~100% federal funding for items eligible Safe Route To School funding.~|~21 - Safety~|~BE36CB3DE312427EC3B7BE28BCCDC11C2331C4C4 99766~|~1~|~1~|~01/STR~|~Bridge removal project. WAS 821 6.70, SFN 8405433. Rural other federal aid funded 100% state. Type C Emergency.~|~13 - Bridge Rehabilitation~|~0E9CE72366519C8A61DC97601808CD976DB68564 92967~|~1~|~1~|~01/ERD~|~Construct a 15' wide multi-use trail path between Collins Avenue and Corbin Street on an alignment that runs primarily on or at the top of the bank of the Ohio River, except in areas where physical constraints and/or right of way availability prohibit. Construction of retaining walls near the top of the Ohio River bank will be required to accommodate grading and aid with slope stabilization.~|~28 - Facilities for Pedestrians & Bicycles~|~25D96270BA017AA7D8ABA543A854D4612247B668 113023~|~1~|~1~|~01/NFP~|~All work in this plan split using funds from the District Preservation Program 100% SAC 4PS7.~|~44 - Other~|~CC7C7D7F3100C9DCEEBCA0A83F04F80A2F798769 100038~|~1~|~1~|~01/BRO~|~The existing continuous slab bridge (HAS-151-0485, SFN 3402010) will be replaced with a new bridge on the existing alignment.~|~10 - Bridge Replacement~|~20F4CEE78971EE7299388800759FBDD64D32ECFA 110684~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~5ECB311AD7BB13C44A8AF684BEE0837C44816E52 110684~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~B77B75C9493F4FF39AFF7F1247D5DF9A41D15ED9 110684~|~3~|~3~|~03/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~9800CB32B4CAB573C4D3E974252C8908DF532208 88888~|~1~|~3~|~03/S<2/COLU~|~80/20 Resurfacing in the City of Columbiana.~|~05 - 4R Maintenance - Resurfacing~|~1E8331E20C20540C75DC03B0ED5913A0E2727BC3 88888~|~1~|~5~|~05/S<2~|~See linked structure.~|~13 - Bridge Rehabilitation~|~F3E573E49B3C9ECBDCDD39E1C030DD1545B67549 88888~|~1~|~4~|~04/STR~|~See linked structures.~|~10 - Bridge Replacement~|~4274416B643462E18B6FAB65C57EC61CD1826160 88888~|~1~|~2~|~02/S<2~|~Resurfacing MAH SR 46 from 0.14 to 0.74.~|~05 - 4R Maintenance - Resurfacing~|~D777058E45313B85AAEC6EDF4816776862ECB966 88888~|~1~|~1~|~01/STR~|~Resurfacing MAH SR 46 from 0.74 to 8.54, includes minor culvert work to SFN 5000971 and SFN 5000858.~|~05 - 4R Maintenance - Resurfacing~|~DA5CC0E4C0B8C21288B168F8F092180A0588F9E0 119034~|~1~|~1~|~01/STR~|~Storm sewer work and culvert replacement along DEL-37-6.50-6.73.~|~66 - Resilience Improvement - Highway Project ~|~AE3408E0B1A32BDAF2CA280BB7FD9E9AE7821382 105725~|~1~|~1~|~01/MPO~|~Split for Part 1 MPO eligible funded resurfacing work from SCL to Norwood and Farnsleigh to Fairmont.~|~05 - 4R Maintenance - Resurfacing~|~1D452A4312EC931C376E8F3A88BAF5F3CC58D9C8 105725~|~1~|~2~|~02/NFP~|~Split for Part 1 non-eligible funded resurfacing work from SCL to Norwood and Farnsleigh to Fairmont.~|~05 - 4R Maintenance - Resurfacing~|~06145F5BE0E59157CB883D37723D7EAB63CA6557 105725~|~2~|~3~|~03/SAF~|~Split for Part 2 intersection safety work at Shaker Blvd intersection.~|~21 - Safety~|~1A40F0E7E8011F9E0C6D113C9AA3D7CAD3B1C772 105725~|~2~|~4~|~04/NFP~|~Split for Part 2 non-eligible work for intersection safety work at Shaker Blvd intersection.~|~05 - 4R Maintenance - Resurfacing~|~577A136EA235CFB779A47CC62CC0CE4AEE8941AC 92895~|~1~|~1~|~01/SAF~|~Section Improvement- Turn Lanes/Access control/Misc Split Funded with RCRPC/Village of Bellville/District Allocation/Safety Funds.~|~21 - Safety~|~03863879F38F79786564930E5D23B3049F27B572 92895~|~1~|~2~|~02/SAF~|~Adjust 10 each Manholes to Grade. Richland County Funding Responsibility.~|~44 - Other~|~8B0802E8B65E9CB0C28AEB1A3C4C86B4B5A6D0CA 123943~|~1~|~1~|~01/S>2~|~Roadway reconstruction, curb, sidewalk, streetlights, catch basins, signals, curb ramps, and multi-use side path.~|~04 - Reconstruction - No Added Capacity~|~51A04BD7366A8E68EDD20CC81223C3C7F15F8843 87480~|~1~|~1~|~01/MPO~|~Bridge replacement of SFN 1247778 CLA CR 380 0145.~|~10 - Bridge Replacement~|~3B96CF9E127C690B4C59C81D4CFD0EDF47197EC4 108585~|~1~|~1~|~01/NFP~|~The VILLAGE will improve Industrial Drive starting at SR97~|~01 - New Construction~|~5ADDAC15BCB7D9C2DCA8F0638226720E28F45FFC 124449~|~1~|~1~|~01/MPO/STCE~|~Intersection improvements.~|~21 - Safety~|~19F13E2ED9654C9138CD8E420A8BF6334EFD5597 93869~|~1~|~1~|~01/IMS~|~Replacement of two signals in the City of Girard.~|~21 - Safety~|~8208DA425D981A787FC8EF17FE8D2308672ACEC3 93023~|~1~|~2~|~02/STR~|~Bridge painting project. HOC 328 11.33 (SFN 3703878). Federal 80% and State 20%.~|~44 - Other~|~8B336DD791DE750F1B5CBDE95DCB6ED2D2FCD872 93023~|~1~|~1~|~01/NHS~|~Bridge painting project. HOC 33 8.30 (SFN 3700429) and ATH 682 0.04 (SFN 0500925). Federal 80%, State 20%.~|~44 - Other~|~F2036840F8722274EAAA0ED875DEF617D6FD31D0 100667~|~1~|~1~|~01/STR~|~Resurfacing COL-45 fro SLM 19.63 to 22.03 with fine graded polymer overlay and COL-558 from SR 7 to SR 46 with asphalt concrete overlay, including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~D926130519140D61F938F28EC69967C6D61A0E9D 100667~|~1~|~2~|~02/NFA~|~Resurfacing COL-558 from SR 45 to SR 517 including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~70AFC275081C9D3EEFAC1CCC498845CE587D8612 102348~|~1~|~1~|~01/S<2~|~Resurfacing BEL-9 from 16.236 to 16.784~|~05 - 4R Maintenance - Resurfacing~|~45263E5D61991C54F63BF84FB4474EEECF42FBEF 102348~|~1~|~2~|~02/STR~|~Resurfacing BEL-9 from 16.784 to 23.396 and HAS-9 from 0.000 to 1.304~|~05 - 4R Maintenance - Resurfacing~|~209032E5A507D1D573C0B65BAE21535A06B59839 113147~|~1~|~1~|~01/MPO~|~Split for MPO fund eligible work.~|~05 - 4R Maintenance - Resurfacing~|~6A83228E8A1C0223A5488DEE5379A315BA0EF93E 122217~|~1~|~1~|~01/SAF~|~converting 4 leg intersection to a single lane roundabout.~|~03 - Reconstruction - Added Capacity~|~3FC787BFA17CAB177D84DD6FC4E0DB654BB15BBC 100212~|~1~|~1~|~01/S>2~|~District 7 general construction inspection~|~17 - Construction Engineering~|~6A56A0084F54E9A9A0DFADFF214833580959DC5A 105438~|~1~|~1~|~01/STR~|~Install fiber optic cable and other items necessary using the local routing~|~44 - Other~|~3405C040D2F0949B691DD1EA564614CED1D3B0AE 105740~|~1~|~1~|~01/STR~|~District preservation funds at a rate of 80% federal SAC 4PF7 and 20% state SAC 4PS7. This bridge meets the state but not the federal definition of a bridge.~|~04 - Reconstruction - No Added Capacity~|~B9E4D7A60FA645A73ADCA7728014443240351AB4 105740~|~1~|~2~|~02/BRF~|~District preservation funds at a rate of 100% state funds SAC 4PS7. The bridge in this split is on a Minor Collector and but eligible for federal off system bridge funds.~|~10 - Bridge Replacement~|~B4C73B7500D8400FA6B4E16B9DE5A3127DA690DA 110115~|~1~|~1~|~01/IMS~|~Generic plan split for crack sealing interstate routes. Route to be determined.~|~17 - Construction Engineering~|~924DCF45699ADFE38BB85F884CFDE36FC5F500BD 120877~|~1~|~1~|~01/STR~|~All work is included in this split~|~04 - Reconstruction - No Added Capacity~|~7AD155049232ED023130905694D5E6CC21B82315 122974~|~1~|~1~|~01/SAF~|~Plan Split for safety-funded scope ~|~28 - Facilities for Pedestrians & Bicycles~|~D72A700E75800D10D459902D450D6E6A88D3EAEA 91943~|~1~|~2~|~02/NHS~|~District Preservation Program funds SAC 4PF7 and 4PS7. NHS. No local funds. Work inside the Kenton Urban Area but outside the City of Kenton. Work on SR 31 on the left side from 9.87 to 9.96 and on the right side from 9.87 to the end of the project at 10.18. This section of SR 31 was added to the NHS with MAP-21 because it is a Principal Arterial.~|~05 - 4R Maintenance - Resurfacing~|~191802CF8E63DD803CAF537CF475B3665FFA0249 91943~|~1~|~1~|~01/STR~|~District Preservation Program funds SACs 4PF7 and 4PS7. Rural STP. No local funds. Work on SR 31 from the county line at 0.00 to the Kenton Urban Area Boundary at 9.87.~|~05 - 4R Maintenance - Resurfacing~|~2D8FB4A14CF1B2C4742A7D432CAB4013F8324CF3 91943~|~1~|~3~|~03/NHS/KENT~|~Federal funds from the District Preservation Program budget SAC 4PF7. The 20% will be paid by the City of Kenton. Work inside the City of Kenton. Work on SR 31 on the left side from 9.96 to the end of the project at 10.18. No work on the right side. This section of SR 31 was added to the NHS with MAP-21 becuase it is a Principal Arterial.~|~05 - 4R Maintenance - Resurfacing~|~6ECBC85ABF79964C971AB564D942ED2CF28DBA23 104878~|~1~|~1~|~01/NHS~|~SCI US52 2.44 (SFN 7300514)~|~10 - Bridge Replacement~|~E360D06D6B943D4AD0C7F0FA677EDAA008BF90AB 104878~|~1~|~2~|~02/NHS~|~Bridge replacement SCI 52 10.15 SFN 7300514Bridge under 20ft.~|~04 - Reconstruction - No Added Capacity~|~205A4ED4FD2BEDC0BF707CE0CC6701E6BECE2ABB 101222~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~77A627065F73D898E88F546FCD0CDDB1CF7D6925 94454~|~1~|~1~|~01/BRF~|~"01/BRF/BR/GCEO" - CEAO LBR Funding 4B87(80% Federal) / LNTP(20% Local) - CAP at $330,000.00 @ 80% - Replacement of 3034968 GUE TR9420 1.46 Intersect: Leatherwood Creek; BR Eligible for Replacement: Length=62 SD/FO(1) SR=25.0 DSR=5~|~~|~AD52FEAF0CE2F6F2F0B9F658A6436EDBCDD6A05E 109104~|~1~|~1~|~01/BRO~|~All the work of the project. 80% federal funds and 20% state funds from the District budget.~|~13 - Bridge Rehabilitation~|~6171E6F60A40C8678BC37A182FFA21C87F1331A2 106635~|~1~|~1~|~01/ENH~|~Railroad rehabilitation of the Hocking Valley Scenic RR. Federal TAP funds at 80% rate, 15% of TRC and 5% local. Final funding is 95% Federal and 5% Local.~|~22 - Rail/Highway crossing~|~D25B353621ACDFDBFA61BC31AA4C33A5851D4EBA 120923~|~1~|~1~|~01/S5K/ASHT~|~Reconstruction, full pavement replacement.~|~04 - Reconstruction - No Added Capacity~|~53D4CD587737AF6FEBA5B7A11583655AF632E691 110796~|~1~|~1~|~01/STR~|~District Allocation-4PS7 funds. Replace School Flashers.~|~44 - Other~|~AE8E2472C1E647F41D0C5244FE2DD372F0B58F1B 110796~|~1~|~2~|~02/STR~|~Maintenance 4CP7 funds- Replace UPS batteries.~|~44 - Other~|~A316B739FA6CCEF14BAF0887FED26D3AE197278B 100573~|~1~|~2~|~02/STR~|~JAC 788 (2.50-6.22)~|~05 - 4R Maintenance - Resurfacing~|~FEC4164859AC499ADA12E7D631AB4D9271B61F83 100573~|~1~|~1~|~01/S<2~|~JAC 788 (0.49-2.50 & 6.22-6.27)~|~05 - 4R Maintenance - Resurfacing~|~325473EEC12C8A0F0C1CC9CCD04B0FC44040DA92 88787~|~1~|~2~|~02/IMS~|~Bridge Work RIC-430-10.02/RIC-071-17.53 sfn:7006284~|~13 - Bridge Rehabilitation~|~B4F5835AA7C85AFF3248B0E07DE3BF2931845005 88787~|~1~|~1~|~01/S<2~|~Resurfacing RIC-039-16.80-17.34 / RIC-430-07.00-10.02~|~05 - 4R Maintenance - Resurfacing~|~E7100A4D9B80C329966DA6A23067457422EE3D3F 80666~|~1~|~1~|~01/NFA~|~Bikeways added to Warren Riverwalk/Packard.~|~28 - Facilities for Pedestrians & Bicycles~|~491876D9A2D9AAC79EF0F3A611E32D9793931D8F 87587~|~1~|~4~|~04/S<2~|~"04/S<2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Cracksealing on 1) Cos-36-16.14-16.40, 2) Gue-40-9.35-11.99, 3) Kno-229-10.73-14.41~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5EFBC683AFC5A360737188E1D452A44AE840C401 87587~|~1~|~3~|~03/STR~|~"03/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Cracksealing on 1) Cos-36-7.05-16.14, 2) Gue-40-11.99-16.18, 3) Kno-229-14.41-25.38~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~876E80079AE5F7A3B01364B58062EE47ECE35900 87587~|~1~|~5~|~05/NFA~|~"05/NFA/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Cracksealing on Gue-313-(0.00-1.24)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E7C397AB02C8F4E2804BB5CBF61215AB28C7E61 87587~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Crack sealing on 1) Gue-22-9.28-11.01, 2) Cos-36-16.40-19.06, 3)Gue-22-11.01-14.66, 4)Kno-13-0.00-7.36~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9EE0826BB29CA08E781D83902718C745C0A217AE 87587~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Crack sealing on GUE IR70 6.55-17.50~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EBE4CBD3BF3B11AD62BD8DFEE02ED6850BDE09FA 102990~|~1~|~1~|~01/NFA~|~Bridge replacement project on NOB SR 146, SFN 6102344. Not on any federal aid system. Funded 100% state.~|~10 - Bridge Replacement~|~9657F39139A28C17389BF8190FE5D34A1BC6270F 112124~|~1~|~1~|~01/S<2~|~Pavement rehabilitation on SR 344 from South Lincoln Ave to SE Salem corp limit; 95% Small City funds (4B97) and 5% Local funds (LNTP).~|~04 - Reconstruction - No Added Capacity~|~DAAB4AD493993ADB8EDD6317D79F7B330B207E19 87939~|~1~|~2~|~02/S<2~|~"02/S<2/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile Encasement work on 1) 6400094 PER SR13 1.96 Intersect: Sunday Creek; Not BR Eligible for Rehabilitation: Length= 112 SD/FO(0) SR=84.1 DSR=7; 2) 6403603 PER SR669 12.47 Intersect: Moxahala Creek; Not BR Eligible for Rehabilitation: Length= 119 SD/FO(0) SR=67.21 DSR=6;~|~13 - Bridge Rehabilitation~|~3E5D5FCABDCA488B85456B5896DC180A794FBED9 87939~|~1~|~3~|~03/STR~|~"03/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile Encasement work on 6403573 PER SR669 7.02 Intersect: Buckeye Fk Of Jonathan Cr; Not BR Eligible for Rehabilitation: Length= 76 SD/FO(0) SR=96.6 DSR=6~|~13 - Bridge Rehabilitation~|~43B0B1013494D4900BA4F2CCBA928412139DCCCD 87939~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Pile Encasement work on 2300222 FAI US22 13.07 Intersect: Hunters Run; BR Eligible for Rehabilitation: Length= 86 SD/FO(1) SR=63.8 DSR=7~|~13 - Bridge Rehabilitation~|~FCF2325A190DDF8F341B928B5F65FBCD38825A4C 88213~|~1~|~1~|~01/STR~|~Reconstruction of West Street (SR 185) within the Village of Versailles. District funds to pay for resurfacing on DAR SR 185 SLM 5.29 to 5.45.~|~~|~CB20E745110D2C0E3D818F2E6B4AEC0AEDF01816 116231~|~1~|~1~|~01/STR~|~FY28 Chipseal~|~05 - 4R Maintenance - Resurfacing~|~35D87C29CD46CEEC6A38C7A31AA6DFD8477CFC16 107729~|~1~|~1~|~01/STR~|~Landslide repair project. MOE SR 536 8.50, DSR MOE-007. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~671D4E4F45511437A1BE8ABBD252695194149AC1 115489~|~1~|~1~|~01/IMS~|~Added CC funding split HAM SR 264 16.36R~|~13 - Bridge Rehabilitation~|~85DDCE8B3C6D157B989E1C7B6E081A5D9FC6B184 104909~|~1~|~1~|~01/NFA~|~Elmwood School Bus Replacement~|~44 - Other~|~3EFEBF58718660638D32BCF57C9F2BBC7127D19D 127097~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~0C8DA6DF855D6941D4A1B4AC4A5F1A3C62941B0E 93012~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on Lic-IR 70-15.72 to 19.54~|~05 - 4R Maintenance - Resurfacing~|~06C30CE05DB3D6C2FACA39211DACCB32BB77081E 93012~|~1~|~2~|~02/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Deck sealing on identified structured~|~47 - Bridge Preventive Maintenance~|~8B8B84E4BF080DDC09579F6E34771E1893BB49CC 89172~|~1~|~1~|~01/STR~|~Culvert replacement project. MEG 124 54.43. SFN 5301807. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~BF15B72ACC1A4D0E27BEE88DCEBE670CA361AB7D 105330~|~1~|~1~|~01/STR~|~Smooth seal on rural route: AUG SR 197 SLM 7.44 to 13.44~|~05 - 4R Maintenance - Resurfacing~|~66A40F3FED1349E20FDBC5E59EBE764DAA2B7D3B 117649~|~1~|~1~|~01/BRO~|~Split for bridge replacement work~|~10 - Bridge Replacement~|~963C1A3ED23340013F3AA87402017FAA03370582 110298~|~1~|~1~|~01/SAF~|~Upgrading the VSL communications lines using federal/state safety funds~|~21 - Safety~|~C1635E5CEFEA4466D81294692594BDCFD3384751 111417~|~1~|~1~|~01/IMS~|~Deck replacements on existing structures.~|~~|~21DD7C9856E4AC157481F6FD419A5BC27103BED6 111417~|~1~|~2~|~02/IMS~|~Widening of existing structures for future 3rd lane (currently for MOT).~|~~|~66FBCF2239CFC5296A5E6FDA1108B719C8778729 106644~|~1~|~1~|~01/ENH~|~Bridge replacement project on Locust Street (0566268).~|~10 - Bridge Replacement~|~F010E061CB2D6B986820C6DB29B7BF76C7451D6E 94296~|~1~|~1~|~01/CMQ~|~40 signalized intersections within the City of Mason~|~21 - Safety~|~6BB062CB80DDB621AC0A044EDB2A35696FBDF097 125663~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural sections ~|~05 - 4R Maintenance - Resurfacing~|~6746B5A04ED6A2B6143526D401B2BA7EA09B8D94 94118~|~1~|~2~|~02/STR~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~BFB16ABDD035EC9C71E13EA8B5E0CCB895D1C82E 94118~|~1~|~1~|~01/STR~|~Resurfacing TRU-SR 7 from 17.02 to 23.48 and TRU-SR 305 from 23.97 to 26.54.~|~05 - 4R Maintenance - Resurfacing~|~6955BDA3E750F91EDACC583938311DCEFCCCF00E 118988~|~1~|~1~|~01/SAF~|~Split for turn lane addition~|~21 - Safety~|~D379A3CFA3B49FADFA918EF78BFF5BB9433C7314 111403~|~1~|~1~|~01/NFP~|~Split for ITS camera replacement~|~44 - Other~|~9534EA4C8B7F9CC697293329E26242DA6ABB8586 112434~|~1~|~1~|~01/NHS~|~Culvert replacement project. GAL 7 2.45 (CFN 1819227). NHS route funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~93ABA083B15A29BD0E50C97B2CCFA4167EF756BC 117399~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items~|~10 - Bridge Replacement~|~933BD1213F8F3C234F44FF11E49D2112D29504F0 125540~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~F083FB09C47E1AD74C14572EED1277E43B022457 111299~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer FY2024 project to install new and upgrade existing guardrail on various county roads. 4HB7 - See cap comments.~|~21 - Safety~|~229F89E737B4F5F5BC143D0266174B76A704462F 125332~|~1~|~1~|~01/NFP~|~Created for J&C involvement. ~|~44 - Other~|~D3A3DE7D93FE75CAD68C4255B8C15808016D98AB 120934~|~1~|~1~|~01/BRO~|~Repair abutment on bridge carrying SR 519 over TR 264 (Busby Road).~|~13 - Bridge Rehabilitation~|~AEF7443E8DC9C9CA4A082C918F1E021086BFC5E2 117471~|~1~|~1~|~01/NFA/STCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~049C84B2EB2D4F8B4EC547965A087E184612CC19 102660~|~1~|~1~|~01/NHS~|~Bridge Replacement: LOR-20-20.47 (SFN 4702220)~|~10 - Bridge Replacement~|~BCC82203977C16DBAAC8050A04497E737A8AB8F1 117513~|~1~|~1~|~01/NFP~|~Plan split for resurfacing within ODNR facility~|~05 - 4R Maintenance - Resurfacing~|~2FCCA89A01CA32CAFD13292E1D7F77ABE73ADFDF 104167~|~1~|~1~|~01/NHS~|~LAW 52 11.53 Phase II Rock Remediation.~|~04 - Reconstruction - No Added Capacity~|~4B74E1085B3326D458E2A8F239673F364BB05275 104167~|~1~|~2~|~02/NHS~|~LAW 52 11.75- 15.00 resurfacing. District funding.~|~05 - 4R Maintenance - Resurfacing~|~2D1D55155CB1AE256FCFEF4C82AC4AC26BC31B27 104167~|~1~|~3~|~03/NHS~|~LAW 52 11.75-14.08 barrier wall.~|~21 - Safety~|~BC589E201CC60FDC568F67CF156DA4EAFF1307B9 110051~|~1~|~1~|~01/IMS~|~FRA IR 670 0.87-3.88 and Roadways A & B~|~05 - 4R Maintenance - Resurfacing~|~08EC3A694D42FD3901B6FEA158BFFBF23C763F97 110051~|~1~|~2~|~02/IMS~|~Minor bridge work on 15 structures~|~47 - Bridge Preventive Maintenance~|~3C514CF7F56CA9345DF0F7BA46ADE01A7F94B21A 110051~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~C545A7BB5431419DC28E538325B72CB06FF4C145 110051~|~1~|~4~|~04/SAF~|~All Items of work associated with the installation of Guardrail between I-670 and the existing Bike Path.~|~21 - Safety~|~F41F7720B78D85FDB9D0BB6CA5DBE165D7E859BD 105601~|~1~|~1~|~01/STR~|~Rural plan split: MAR-4-1.69-1.79 MAR-47-2.09-8.56 MAR-203-0.43-1.19 MAR-203-3.24-7.74 MAR-309-29.21-30.09 MAR-739-3.63-3.80 MRW-61-22.86-25.27 MRW-95-6.16-8.13 MRW-95-15.49-16.81 MRW-95-17.30-19.73 MRW-95AC-0.00-1.15 PIC-674-0.00-1.22~|~05 - 4R Maintenance - Resurfacing~|~61658859234AF40D3AA6D024461C0EC323EFB5BE 105601~|~1~|~2~|~02/NHS~|~NHS plan split: PIC-23-1.49-5.21 PIC-23-12.92-22.63~|~05 - 4R Maintenance - Resurfacing~|~59D814267AA5FA5B4F6B2CA84DC0415F05A263D6 114461~|~1~|~1~|~01/S<2~|~Resurfacing US 40~|~05 - 4R Maintenance - Resurfacing~|~D76356E761F49369ED902FAF4BDB8A7F586CF352 102931~|~1~|~1~|~01/BRO~|~FUL-109-1698 Bridge~|~13 - Bridge Rehabilitation~|~7703A8E4ACFFC57587DD0F2DEE031D73C0725696 94272~|~1~|~1~|~01/NFP~|~Construction of a new Athens County M&R facility. Funded 100% state.~|~44 - Other~|~89D8950BDF86A06D9EFD275D274D40D5F37788D7 125078~|~1~|~1~|~01/STR~|~Replace culvert carrying SR 800 over branch of Stillwater Creek.~|~04 - Reconstruction - No Added Capacity~|~219C41CF20E6C1EE2C36A478F574C9DD2E63CFDF 94803~|~1~|~1~|~01/IMS~|~Funding for all work on the interstate sections~|~05 - 4R Maintenance - Resurfacing~|~466745E440BD855CBEB19F663FA5D0E76137BE7A 94803~|~1~|~3~|~03/S>2~|~Split for work on CUY-283 and LAK-283~|~05 - 4R Maintenance - Resurfacing~|~47D9F7F2432607BFB711BA861048969ACF04D580 94803~|~1~|~4~|~04/STR~|~Split for all work on GEA-322, GEA-168, and GEA-528~|~05 - 4R Maintenance - Resurfacing~|~B5485182D2622AED601A00492C0B16F21F0839D8 94803~|~1~|~2~|~02/NHS~|~All work on GEA-44~|~05 - 4R Maintenance - Resurfacing~|~FE9D2F0A8BE08AB8B97350EB32AB695259839043 120346~|~1~|~1~|~01/IMS~|~Replace deck on Trabue Rd over IR 270 (existing width 66% of structure)~|~13 - Bridge Rehabilitation~|~FDBAB94F7004431AE9301E51D2F157E2B1033AFF 120346~|~1~|~2~|~02/IMS~|~Widen Trabue Rd structure to accommodate a shared use path (34% of structure) and construct a shared use path from Tenagra Way to Trabue Run Rd.~|~13 - Bridge Rehabilitation~|~222BDCEF1B25BF3AE4EDD99E96656A6781992478 91783~|~1~|~1~|~01/STR~|~D10 Chip Seal FY 2025 South: HOC-180-7.32-11.92; HOC-664-0.00-2.89 and HOC-56-9.43-13.57.~|~05 - 4R Maintenance - Resurfacing~|~A58D7A85E5DD9A775045B01B18756A533D4799E1 92498~|~2~|~2~|~02/BRF~|~Rehab of bridges to add guardrail along with Full Width Ashphalt Intermediate and Surface Course~|~17 - Construction Engineering~|~38F1AE9E8E9D2F8BEA6BDD4C2C2B889A1B8362EE 92498~|~1~|~1~|~01/SAE~|~Guardrail replacement~|~21 - Safety~|~7514CFE6F36969C189EA7EBB59C872490774BDBB 101376~|~1~|~2~|~02/NHS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~03CA7CABEDD4281369B9079D520686B88BB7B607 101376~|~1~|~1~|~01/IMS~|~Minor rehabilitation on the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~E633F65C6E2B92724BB0CBAE2D844CE697E3C79F 101376~|~1~|~3~|~03/STR~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~F21E54252A9671F05F7B8B64AE37B4C28E8A5D50 95787~|~1~|~2~|~02/NHS~|~WOO-6~|~05 - 4R Maintenance - Resurfacing~|~C2864DEF727A7294923DB169F1B1FFAD72C4B6E1 95787~|~1~|~1~|~01/STR~|~WOO-199~|~05 - 4R Maintenance - Resurfacing~|~57456DE29FE24DA05F1BEA5AA8DFA8F2CF9F6989 116556~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D52D453A067465BC6EF03A4D8AB8DBED3771D850 120082~|~1~|~1~|~01/SAF~|~Construct a roundabout on SR 172 at Alabama Ave.~|~21 - Safety~|~16F0F920F69141CC1EF9D230B5B8CAE161165DE5 120082~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~897C0A10860A9108C5A5C6679EB7407AEE7EDC4C 120082~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A68CFA1A9D9987CCB3A1B9877E1516770E77F4B7 120082~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~F6D97D676B84B63E7AE4D826D0AC4F1CD7C1CCD9 95242~|~1~|~1~|~01/NFA~|~Construct a new salt building and equipment storage guilding at the Darke County Garage facility.~|~~|~1BBFFEE1EA5451D74A684BDD948D5DC8EC460305 122401~|~1~|~1~|~01/NFA~|~Bridge replacement project on NOB CR 37 4.62 (SFN 6130038). Funded 95% Federal (80 Federal/15 Credit Bridge) / 5% Local.~|~10 - Bridge Replacement~|~7D8D320310C37E8D9EB450F897D76D8BF6A5DCF2 107868~|~1~|~1~|~01/SAF~|~District Wide Pavement Marking/RPM~|~21 - Safety~|~EA02B3DC1C9E7089C178096041982AA4957D0124 121347~|~1~|~1~|~01/NFP~|~plan split.~|~47 - Bridge Preventive Maintenance~|~29097C8591D31715FA6CC6C5FE8170DDD48A3A4E 108002~|~1~|~1~|~01/MPO~|~Mill and resurfacing of W. Second Street from S. Progress Drive to Massie Drive.~|~~|~91569576AE38EEA20520239E3FE7F553BF7B4800 127119~|~1~|~1~|~01/SAF~|~Roundabout at SR-48 NB ramps and SR-123~|~21 - Safety~|~DA62C32A6AF3346BC4665CB39C3CB8DC411DFE66 119464~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~5B7F24FD514DEAF18F39AC22E1BB3C12332B540D 117543~|~1~|~1~|~01/NFP~|~Replace culverts and headers ~|~04 - Reconstruction - No Added Capacity~|~C87279899F3AB3902EAA52C10F17D67A6F4D7378 124566~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~~|~3CB2CB9D6DF3F7A956DEFB0F9AD8A376D7892D84 109347~|~1~|~1~|~01/SAF/KENT~|~Resurfacing and widening of CR 502 in the city of Kent.~|~05 - 4R Maintenance - Resurfacing~|~650EB306F47B6F8BC74BFD043551B815AA8D32F8 98795~|~1~|~1~|~01/ENH~|~Work funded through the Transportation Alternatives Program. Historic Riley Township Bridge #6932509 Restoration Project.~|~30 - Scenic or Historic Highway Programs~|~F42F60A91326C9908AF554D1890BDB654137AEAF 111064~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 14.18-14.23. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E696984FCDEC2F7257A276DECBFB008D0D96343 114657~|~1~|~1~|~01/NFP~|~GR project FY27~|~21 - Safety~|~6B116E4622082C8D7350A0F872DB9E55974093BB 98357~|~1~|~1~|~01/STR~|~STP Rural 80/20 UNI-42-0.00 to 4.50~|~05 - 4R Maintenance - Resurfacing~|~76B57530B0D774D262DC357EC0C6272EE0D45480 99519~|~1~|~1~|~01/NFP~|~Guardrail district wide.~|~44 - Other~|~5DCA34A56BFC5DD8AA6EDE1686C260C15AE66DC2 117081~|~1~|~1~|~01/S>2/YOUN~|~Bridge replacement.~|~10 - Bridge Replacement~|~81F1D235BCEAEFA6DF11FCEECF2CFEEC759661EC 127136~|~1~|~1~|~01/SAF~|~100% funded for install of new raised pavement markers on various county roads ~|~21 - Safety~|~663DBA958F87B0E66E476BDB07BCB8A9FD8E2FB4 127193~|~1~|~1~|~01/S5K/GENE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~028FF867A390301AB52FFC4C1A94979CC7AB4CF6 127193~|~1~|~2~|~02/S5K/GENE~|~Full and partial depth repairs and ADA curb ramps.~|~04 - Reconstruction - No Added Capacity~|~3C5FEFE9A3C7D77AD97F4AF260E90D07D7EA6EF6 108083~|~1~|~1~|~01/STR~|~Plan Split for Fast Dry Pavement Marking~|~44 - Other~|~C0E815231500013BCE185F1850F7832435E90B47 108083~|~1~|~2~|~02/SAE~|~All items of work associated with the installation of Chevron pavement markings at the I-70E/270 Interchange on the West Side of Franklin County~|~21 - Safety~|~B3ADE33CE63CAB55F0B559D1FE9DC26357270FC6 94302~|~1~|~1~|~01/ENH~|~Adding sidewalks along Colonial Drive (CR-38) from Belmont Avenue to 5th Avenue, in Liberty Township, Trumbull County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~B64A2FAAF86DC6385F85554C9D7696115E602F3D 92920~|~1~|~4~|~04/S<2~|~Bridge Work - Structures MED-57-0215, MED-57-0265, MED-57-0323 & MED-57-0137~|~13 - Bridge Rehabilitation~|~4B7D3768BA92EE13BE5A1D06FB0BF9C6910651BC 92920~|~1~|~3~|~03/S<2/WADS~|~100% Local SLM 0.56 TO 02.13, 03.22 TO 03.24, (Local Paving Items)~|~05 - 4R Maintenance - Resurfacing~|~5DE40CADFEDA8014F309624B7D6550B8281F9017 92920~|~1~|~1~|~01/S<2~|~80/20 Fed/State SLM 0.00 TO 0.56, 02.13 TO 03.22 (Outside Corp. Limits)~|~05 - 4R Maintenance - Resurfacing~|~2C0F7A3EE8E0E9276AADED2AFE65C97A4C7D626C 92920~|~1~|~2~|~02/S<2~|~80/20 Fed/Local SLM 0.56 TO 02.13, 03.22 TO 03.24 (Inside Corp. Limits)~|~05 - 4R Maintenance - Resurfacing~|~05E082EEDADF4BF25E89BA87A4E10296859B981E 120043~|~1~|~1~|~01/ENH~|~Sidewalk improvements utilizing Federal Carbon Reduction and Safety funding up to Federal CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~4012B63E82445F5D6C1367085F9E7B66884AD473 119142~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 23.28-25.39 and MEG 33 0.00-4.09.~|~03 - Reconstruction - Added Capacity~|~B6B2BBCE9852C9399186C655155AD71D9B2DB6CF 119142~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on ATH 33 23.28-25.39 and MEG 33 0.00-4.09. Work on the existing roadway.~|~04 - Reconstruction - No Added Capacity~|~2AA8D4C078D5924C2A7E5C963E0D8CEBA26AA3A4 119142~|~1~|~3~|~03/NHS~|~Construction of new bridges on ATH and MEG US 33. ~|~08 - Bridge - New Construction~|~C10D7250D81A461245D70509CAAF32F571390A00 108919~|~1~|~1~|~01/IMS~|~Spot pavement repairs on IR 71 and IR 270~|~05 - 4R Maintenance - Resurfacing~|~CF61E50DB3408CF1FE4F078683590095BDD41534 123409~|~1~|~1~|~01/BRF~|~Plan split for bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~ED79143138AFB415350F857C5FD9E76E05FB374C 97230~|~1~|~1~|~01/STR~|~LAW SR 141 4.06~|~04 - Reconstruction - No Added Capacity~|~A2BF40C1502FCD5A941D85ABFD7D482F28A0BB56 101161~|~1~|~1~|~01/STR~|~Various bridges.~|~13 - Bridge Rehabilitation~|~F9E537E457150EA415400E6166F756C731964CE9 113256~|~1~|~2~|~02/NFP/KENT~|~Items paid 100% by the City of Kenton.~|~44 - Other~|~D48155CDAA9B266F6896585F4017A99AD9AF4AB0 113256~|~1~|~1~|~01/S5K/KENT~|~Resurfacing on SR 31 and SR 53 in the City of Kenton. On the left side of SR 31 from SR 292 at 10.156 until SR 31 enters the City of Kenton on the right side at 10.298 and then on both sides of SR 31 until the Scioto River Bridge at 11.261. On SR 31 from Main Street at 11.669 to Detroit Street at 11.738. On SR 53 from the beginning of the route at Detroit Street at 0.000 to Main Street at 0.100. On SR 53 from Carroll Street at 0.627 to Pattison Avenue at 1.337. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~011C6AA224662C8B31639C3429E2AD0A06C17DCC 113256~|~1~|~3~|~03/S5K~|~Resurfacing inside of the Kenton Urban Area but outside of the City of Kenton. On the right side of SR 31 from SR 292 at 10.156 until SR 31 enters the City of Kenton on the right side at 10.298. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~FD258C90385388C60A51EA4282D13434AEAC3F11 122969~|~2~|~2~|~02/MPO~|~This plan split is only to be used for sidewalk and shared use path work. ~|~03 - Reconstruction - Added Capacity~|~A139E8112373A4B52A216423BE0D5692EF0280C4 122969~|~1~|~1~|~01/MPO~|~Plan split for 50/50 (ODOT/Local) items on CLE Bach-Bruxton roadway project~|~03 - Reconstruction - Added Capacity~|~FB6CBE2C33F753E6EC24009B4F2B3852A00F0097 90890~|~1~|~1~|~01/ERD~|~Signal upgrades at three locations: IR-77/Mull Avenue/White Pond Drive, IR-77/White Pond Drive, and Collier Road/Copley Road, in the City of Akron, Summit County, Ohio. FED Earmark: TCSP 0806~|~21 - Safety~|~07AF453F7D3F7A58BDB9091F92C59B1BDBDCEE51 114383~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV/ - 80% Federal, 20% State~|~05 - 4R Maintenance - Resurfacing~|~322289F41F70701411ADBA5A79176BB9C6A87A77 110599~|~1~|~1~|~01/STR~|~RESURFACING MAR-47-8.34-8.56, MAR-229-0.00-1.05, DEL-229-0.00-0.11, MAR-95-0.00-0.44~|~05 - 4R Maintenance - Resurfacing~|~51C2D9BF7068FACA6AD3F25168F0D1CA9910D6CA 93492~|~1~|~1~|~01/SAE~|~Funding for construction engineering with federal funds. This project does not require a plan split. This split is being entered due to Ellis glitch that is being investigated.~|~17 - Construction Engineering~|~51F74471C670B391A95B9E4309B3D4B5B2381C28 90676~|~1~|~1~|~01/MPO~|~Reconstruct Collingwood Blvd in Toledo,LUC CR514 1.58-3.04~|~04 - Reconstruction - No Added Capacity~|~6C4FBCAEE826DF2FB9F5171276592302E75D8FD8 114563~|~1~|~1~|~01/STR~|~Overlay on SCI 348~|~05 - 4R Maintenance - Resurfacing~|~04E13C8F53B6CD5493C4651F71E58EACDB9E668B 114563~|~1~|~2~|~02/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~199F358FF821FFCF7910B7CA26B74EF89A595007 91617~|~1~|~1~|~01/BRO~|~Replace existing four-sided concrete box (HAS-250-2582, SFN 3402622) with a new four-sided precast concrete box on same alignment.~|~10 - Bridge Replacement~|~15D16DF759437FA62CF420BCFE0E15789C6C0EEE 98013~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~FB5AA4E4CE3B0A0D7E7FE73E33DBB55DC1111AFB 99491~|~1~|~1~|~01/STR/CCEO~|~Coshocton County CEAO County Surface Transportation Program Funds - 4B77 (Federal 80%) / 4BG7 (Local 20%) - See CAP Comments - Project to resurface portions of CR 9 in Coschocton County.Construction Inspection will be performed through the District 5 Construction Office.~|~05 - 4R Maintenance - Resurfacing~|~7E48DAD4877C12D3A4FE1EA718DC22A0152618B6 93198~|~1~|~4~|~04/STR~|~"04/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on 1) 4506243 LIC SR657 12.62 Intersect: Over Otter Fork Lic River; Not BR Eligible for Rehabilitation: Length=150 SD/FO(0) SR=99.2 DSR=6;~|~13 - Bridge Rehabilitation~|~F1D8EFE7AD21AF9BA7AF287F2FD66E389706F2A2 93198~|~1~|~1~|~01/NFA~|~"01/NFA/BR/ " - District Preservation 4PS7(100% State) - No CAP - Bridge painting on 1) 1603213 COS SR751 10.6 Intersect: Evans Creek; Not BR Eligible for Rehabilitation: Length=25 SD/FO(0) SR=91.1 DSR=7;~|~13 - Bridge Rehabilitation~|~7D0E58159411683251527AD5EC545245499CB3B2 93198~|~1~|~3~|~03/IMS~|~"03/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge painting on 4503961 LIC IR70 20.15 Intersect: Ir70 Ovr Tr324 Roley Hill; Not BR Eligible for Rehabilitation: Length=165 SD/FO(0) SR=94.8 DSR=7~|~13 - Bridge Rehabilitation~|~0F56A7C94CA327D520DAEC1A7045C9BA4B5F5E85 93198~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on 4200608 KNO SR13 10.14 Intersect: Dry Creek; Not BR Eligible for Rehabilitation: Length=143 SD/FO(0) SR=65.0 DSR=7~|~13 - Bridge Rehabilitation~|~DB17B8D7ED9D797245FD69638EC21D90FE6E9F9D 96711~|~1~|~1~|~01/ENH/DEF~|~Work funded by the ODOT Central Office Transportation Alternatives program. 80% federal funds with a 20% local match. The 20% local match is provided by the City of Defiance. Overage paid by the City of Defiance.~|~28 - Facilities for Pedestrians & Bicycles~|~D2286AA56E66316781D5D23B4714A572B0FD6F03 101358~|~1~|~1~|~01/IMS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~CEFE6ED72785F22683DD899CB34808492823C757 101358~|~1~|~2~|~02/NHS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~0E85F59F46D8A87E4A619489B771825BD4B368BC 101358~|~1~|~3~|~03/S<2~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~CBBDF2736B6CC615E61AD0F96ABE114F14D21102 101358~|~1~|~4~|~04/STR~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~65DC418F12D092F98B289A31033C95E67ACEDC56 105369~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal routes: CHP SR 245 SLM 0.00 to 6.16CHP SR 507 SLM 0.00 to 3.09LOG SR 273 SLM 9.91 to 12.89LOG SR 559 SLM 0.00 to 4.02LOG SR 638 SLM 0.00 to 3.99~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~81BEBF69E0C2818AC3B88F9A9F54F643BF67E469 105369~|~1~|~1~|~01/STR~|~Chip seal on rural routes: LOG SR 245 SLM 2.10 to 5.12MIA SR 589 SLM 8.94 to 11.97CHP SR 245 SLM 10.72 to 10.81CHP SR 245 SLM 10.81 to 17.06LOG SR 292 SLM 3.63 to 4.65LOG SR 292 SLM 5.41 to 10.81LOG SR 235 SLM 8.18 to 13.89LOG SR 245 SLM 5.12 to 5.84CHP SR 559 SLM 7.88 to 11.38CLA SR 41 SLM 0.00 to 3.63LOG SR 273 SLM 12.89 to 13.49~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CA346745B17EF1EEF1C594E1FB10306511D36E09 121966~|~1~|~1~|~01/SAF~|~Safety Items~|~21 - Safety~|~3736CAF59BF8A0C75EC81B966016BE1E23E9A867 107972~|~1~|~1~|~01/NFP~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~C014DDAB9DCB191F65C7AA112A4A7C7C77A0D849 110392~|~1~|~1~|~01/STR~|~Resurfacing STP~|~05 - 4R Maintenance - Resurfacing~|~63791CB9E187239D73241B649A2E00B4A63BAA3D 110392~|~1~|~2~|~02/S5K~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~94DDFACACFECAAC9A69C64E3A7398F71DF4C3646 96827~|~1~|~1~|~01/ENH~|~Construction costs 80% TAP funds (4B37) and 20% Local (LNTP)~|~28 - Facilities for Pedestrians & Bicycles~|~F80858E9DB3B5A4AE36E670636C0BAB2967ED92B 109565~|~1~|~1~|~01/S<2~|~Bridge replacement project on WAS 550 20.00, SFN 8402051.~|~04 - Reconstruction - No Added Capacity~|~3F7B49237F6B1D2B102119069711638D1D2087C7 99330~|~1~|~1~|~01/ENH~|~test~|~17 - Construction Engineering~|~85365C6E875FFABE745B1AEF07F1A69FB5966C98 99330~|~1~|~2~|~02/IMS/ERI~|~test~|~~|~0CBDB3EB04A43B4CDCF864F53C268DEB02892021 99330~|~1~|~3~|~03/IMS~|~test~|~17 - Construction Engineering~|~55CFE7C3BC3EF67ABE660945E00F9EE1A41ED943 91806~|~1~|~1~|~01/BRF~|~"01/BRF/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6006574 MUS SR666 5.61 Intersect: Blount Run #; BR Eligible for Rehabilitation: Length=31 SD/FO(1) SR=49.7 DSR=3~|~~|~45490A56AAAF854966C787431DA3D5F66656D423 93678~|~1~|~3~|~03/NFA~|~For work on SR 330 in Hancock County from the NCL on Vanue at 1.14 to SR 568 at 3.00. 100% state funds from the District Preservation Program. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds. Road is a Rural Minor Collector that is not eligible for federal funds.~|~05 - 4R Maintenance - Resurfacing~|~13E286C6E1CD0798204A92491834F9C90A47F69F 93678~|~1~|~1~|~01/S<2~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Resurfacing on HAN SR 568 from 2.11 to the Finday Urban Area boundary at TR 242 (4.40) on both sides of the road. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~08B1F549CDF3399F54108138793873166F79EB7D 93678~|~1~|~2~|~02/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap - Resurfacing on HAN-568 from the Findlay Urban Area boundary at TR 242 (4.40) to the end of the work at 11.26 and and all work on WYA-568 which is from 0.00 to 4.15.~|~05 - 4R Maintenance - Resurfacing~|~3D2ED85B1D7D750EB62E285505437467BF258580 96341~|~1~|~1~|~01/MPO~|~Construction of a sidewalk on the south side of Scott Street, from approximately 390 feet west of Westgate Drive to Westgate Drive, and the installation of pedestrian signal heads at the intersection of State Road (SR-264) and Miami Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~D1AA95BAABDADC946F840291E5B431465561C783 111618~|~1~|~1~|~01/S<2~|~City of Dublin Urban Paving Split: FRA-745-0.69-0.71, 0.96-2.96 DEL-745-0.00-0.84~|~05 - 4R Maintenance - Resurfacing~|~213C0684578B22EEAB3A6AE46F56C7626EF741A2 111618~|~1~|~3~|~03/S50~|~100% City of Dublin Cost items - pavement repairs, special striping.~|~05 - 4R Maintenance - Resurfacing~|~FE8D6C5A815239084AE5675F80C3ECCD4DA38C0C 111618~|~1~|~2~|~02/S>2~|~General System Plan Split: FRA-745-0.71-0.96, DEL-745~|~05 - 4R Maintenance - Resurfacing~|~96C6D28CD8ABF693BBF98CDD4CA34239AE6D81EC 109941~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~B0587649D705C8F80324C5B5B51C0EBBAB435515 126951~|~1~|~1~|~01/IMS~|~Concrete joint repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3884730FEBEC93E15ED3458620235E3D9F02FDDE 107173~|~1~|~1~|~01/STR~|~Concrete bridge deck overlay. NOB 147 13.41 (SFN 6102956). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~15FD6FF8F4043BF2F4AE1D523544291C27B69134 93849~|~1~|~1~|~01/SAF~|~Safety funding to replace guardrail at piers 01/SAF/OT/~|~21 - Safety~|~74AAAFB05836852AAD65936ACEDB508275B31387 98207~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - District Preservation 4PF7 (090% Federal) / 4PS7 (10% State) - No CAP - Fast Dry Pavement Markings on Interstate Routes for: FAI-70-(0.00 to 2.38), LIC-70-(0.00 to 29.42), MUS-70-(0.00 to 1.46).~|~21 - Safety~|~E8A2549BF912C1D87AD097E212312FF1304D29A1 98207~|~1~|~5~|~05/S>2~|~"05/S>2/OT/ "- District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings: FAI-204A-(0.00 to 0.49), FAI-204-(0.36 to 6.93), FAI-256-(5.99 to 6.53), LIC-40-(0.36 to 6.14)~|~21 - Safety~|~E69A139E60B5B9586DE68896374783FE39CADC1A 98207~|~1~|~4~|~04/NHS~|~"04/NHS/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on NHS Routes: FAI-33-(0.00 to 5.10), FAI-33-(8.08 to 17.44), KNO-13-(11.81 to 23.11), LIC-13-(11.90 to 23.40), LIC-16-(7.22 to 15.96), LIC-16-(24.58 to 33.14), LIC-62-(0.00 to 4.71), LIC-79-(4.11 to 4.17), LIC-79-(4.60 to 6.56)~|~21 - Safety~|~CB398504E5EA7A11D812D5E6B404D82ADB065F78 98207~|~1~|~6~|~06/NFA~|~"06/NFA/OT/ " - District Preservation 4PS7 (100% State) - No CAP - Fast Dry Pavement Markings: FAI-188-(24.53 to 26.53), FAI-312-(0.00 to 3.75), HOC-312-(0.00 to 0.40), KNO-205-(0.26 to 6.94), KNO-657-(0.00 to 4.93), KNO-715-(0.00 to 4.26), LIC-657-(0.86 to 14.91), LIC-668-(0.00 to 2.73), PER-188-(0.00 to 4.48), PER-204-(10.00 to 18.66), PER-312-(0.00 to 4.99), PER-383-(0.00 to 1.50), PER-555-(0.74 to 3.77), PER-668-(17.64 to 26.35), PER-757-(0.00 to 5.68)~|~21 - Safety~|~3BAD18286F7AB97E19495EFFD8F7832C2A35B2B2 98207~|~1~|~2~|~02/S<2~|~?02/S<2/OT/ ? - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on OFAH-Urban routes for: FAI-22-(11.74 to 11.96), FAI-22-(11.96 to 13.15), FAI-22-(18.05 to 18.08), FAI-22-(18.08 to 18.67), FAI-37-(9.73 to 10.40), FAI-37-(10.40 to 12.92), FAI-37-(13.69 to 14.40), FAI-37-(19.70 to 19.74), FAI-188-(16.02 to 19.05), FAI-204-(13.86 to 16.80), FAI-360-(0.00 to 1.72), KNO-3-(18.95-20.59), KNO-229-(9.53 to 14.41), KNO-586-(11.37 to 12.92), KNO-661-(6.10 to 6.46), LIC-40-(14.37 to 16.66), LIC-37-(16.43 to 17.29), LIC-79-(1.24 to 4.11), LIC-79-(16.43 to 17.18), LIC-310-(1.71 to 2.61), LIC-310-(5.62 to 7.88), LIC-360-(0.00 to 0.22), LIC-657-(0.00 to 0.86), LIC-661-(0.00 to 1.79)~|~21 - Safety~|~67D198EAD75E01BDAC6346FE20443298D969C43E 98207~|~1~|~1~|~01/STR~|~"01/STR/OT/ "- District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Fast Dry Pavement Markings on OFAH-Rural routes for: FAI-22-(0.00 to 10.54), FAI-22-(10.75 to 11.74), FAI-22-(0.00 to 10.54), FAI-22-(18.67 to 26.07), FAI-37-(0.00 to 9.73), FAI-37-(19.74 to 28.20), FAI-158-(2.48 to 15.83), FAI-159-(0.00 to 10.57), FAI-188-(19.05 to 24.53), FAI-204-(6.93 to 13.86), FAI-204-(16.08 to 19.13), FAI-256-(6.53 to 24.63), FAI-664-(0.00 to 12.62), HOC-668-(0.00 to 0.16), KNO-3-(20.59 to 34.71), KNO-36-(0.00 to 10.14), KNO-36-(20.85 to 35.87), KNO-62-(0.00 to 22.65), KNO-95-(0.00 to 11.50), KNO-205-(0.00 to 0.26), KNO-229-(14.41 to 25.38), KNO-314-(0.00 to 2.73), KNO-514-(0.26 to 7.93), KNO-546-(0.00 to 2.15), KNO-586-(0.00 to 3.28), KNO-586-(3.41 to 11.37), KNO-661-(0.00 to 6.10), LIC-40-(6.14 to 14.37), LIC-40-(16.66 to 19.61), LIC-40-(28.60 to 30.14), LIC-62-(4.71 to 20.64), LIC-37-(0.00 to 11.69), LIC-37-(16.59 to 24.43), LIC-37-(25.08 to 25.84), LIC-79-(0.00 to 1.24), LIC-79-(16.25 to 33.10), LIC-146-(0.00 to 2.43), LIC-158-(0.00 to 0.77), LIC-158-(1.13 to 2.28), LIC-310-(7.88 to 10.05), LIC-310-(10.32 to 13.45), LIC-586-(0.00 to 11.35), LIC-661-(1.79 to 14.81), MRG-37-(0.00 to 0.11), MRG-555-(23.06 to 23.74), MUS-40-(0.00 to 1.08), PER-22-(0.00 to 14.27), PER-13-(0.00 to 28.15), PER-37-(0.00 to 8.59), PER-37-(15.02 to 20.69), PER-93-(0.00 to 1.07), PER-256-(0.00 to 0.16), PER-345-(0.00 to 9.22), PER-555-(3.77 to 4.33), PER-595-(0.00 to 2.10), PER-668-(0.00 to 10.19), PER-668-(11.00 to 16.88), PER-669-(0.00 to 6.34), PER-669-(6.97 to 10.15)~|~21 - Safety~|~92635D0C06997B79BF3119238154C5243CF0908E 122768~|~1~|~1~|~01/S>2~|~Bridge rehab Municipal Bridge Program~|~10 - Bridge Replacement~|~366DBF261C7938FA25A6DFDE401EF4B7F5D8969F 105158~|~1~|~1~|~01/NHS~|~Plan Split for the NHS section on CLE-52. Includes patching of bridge CLE-52-23.46 wearing surface.~|~05 - 4R Maintenance - Resurfacing~|~CBC2993B37D618C92651C819F40B062C41690815 109388~|~1~|~1~|~01/ENH~|~Plans split for Bikepath~|~28 - Facilities for Pedestrians & Bicycles~|~D4DA3CD20AF3F4E35739113FDDC6681D8AA9E06B 109388~|~1~|~2~|~02/NFP~|~Plans split for 100% City items - Possible sewer work~|~28 - Facilities for Pedestrians & Bicycles~|~5D378FACDECC5B19086E0FC1044DC3E2A23C74B8 88788~|~1~|~1~|~01/S>2~|~Cheviot Road: from the south intersection with Blue Rock Rd. to Galbraith Rd. Project includes the realignment of Blue Rock Rd. at the north intersection with Cheviot Rd and addition of left-turn lanes on Cheviot Rd. at the intersection; resurfacing of Cheviot Rd.; and reconfiguring the lanes on Cheviot at the south intersection with Blue Rock Rd.~|~21 - Safety~|~954F3DAF9F0A2C641BE7ED01106B93A3C652D7B2 92656~|~1~|~1~|~01/MPO~|~Resurfacing CR 508 0.09 - 0.39~|~05 - 4R Maintenance - Resurfacing~|~195334AA5181E2846441ED80892938F57086352C 125842~|~1~|~1~|~01/IMS~|~Interstate Mowing in D8~|~44 - Other~|~08ED7C14D2989D535D396C9AFF3E25C8C0F9F3D2 125842~|~1~|~2~|~02/IMS~|~Mowing in D7~|~44 - Other~|~47675B5BE7B20BCFFAAD2A302C5573AC870E61D3 110585~|~1~|~1~|~01/STR~|~Paving and miscellaneous work on UNI/DEL/MAR SR 4 including edge line rumble stripes~|~05 - 4R Maintenance - Resurfacing~|~D28AA68F038478E616433A026B4193F3BB4C6CCB 110585~|~2~|~3~|~03/STR~|~Pave top 1 1/2 inches on SR 37 and pavement markings~|~05 - 4R Maintenance - Resurfacing~|~623F24353C584E30DC1CF523C4F1CCB83536636D 110585~|~1~|~2~|~02/SAF~|~Install center line rumble stripes UNI/DEL/MAR SR 4~|~21 - Safety~|~B2061944D43B573D1E96CD9987A8006F9E3AEA2B 110585~|~1~|~5~|~05/STR~|~All bridge work associated with MAR-4-1.79, SFN 5100038~|~17 - Construction Engineering~|~07FCAE7183FDEFEF8A315D31FC601F05A95211EB 110585~|~1~|~4~|~04/STR~|~All bridge work associated with UNI-4-25.78, SFN 8000344~|~47 - Bridge Preventive Maintenance~|~D2120274D2B6C1E8A4721017BA5065C6D06E1196 21964~|~1~|~1~|~01/STR~|~Brdg Replacement. 0.35 MI NE OF CR34. 0101265 ADA SR41 20.28 Intersect: Murphy Run80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~330E5D3258DE0AE90EF4C2D42D9B0F6981BB138A 100463~|~1~|~1~|~01/STR~|~Chip Sealing of CAR-39, HAS-9, and HAS-519~|~05 - 4R Maintenance - Resurfacing~|~E9F19A6E3184BA5D16907F2F54DD55B277CEB47B 109610~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 555 23.09, SFN 5801982.~|~10 - Bridge Replacement~|~1BAB2772C72FBD0AD48F57D5544829B64326E330 114332~|~1~|~1~|~01/NFA/TRCE~|~Rehabilitation of West Market Street bridge over the Mahoning River.~|~13 - Bridge Rehabilitation~|~7C1CEDD82CA16FBEA0624BFA44002E325283243C 105406~|~1~|~1~|~01/NHS~|~Bridge repair on NHS route.~|~13 - Bridge Rehabilitation~|~416E10860CBCB4ECCC95EAFE570C9E9EBBEAAD6B 105406~|~1~|~2~|~02/STR~|~Bridge rehab on rural bridge.~|~13 - Bridge Rehabilitation~|~0F3960F689089D580CEB23FFC7F883800AC7AA2D 102416~|~1~|~1~|~01/NHS~|~STA US 62 from 8.34 to 8.50~|~05 - 4R Maintenance - Resurfacing~|~74C2CF9A02DD5D45684EE5B05635D7F8C0881004 102416~|~1~|~2~|~02/STR~|~STA US 62 from 3.96 to 4.87~|~05 - 4R Maintenance - Resurfacing~|~8455D3565DAC47B5A1EF990F0DD26E1FE49DF4D5 102416~|~1~|~4~|~04/S>2~|~STA US 62 from 4.87 to 8.34~|~05 - 4R Maintenance - Resurfacing~|~DD2DBC9E3D3E27017ED1EFB956BDAB4AFDABAAAC 102416~|~1~|~3~|~03/STR~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~59B1E7E76A6D726913BDB7E71829517350AD483F 102416~|~1~|~5~|~05/S>2~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~4650ABE932B31AFDA70B6404BCBFEEF93DE28EDC 114975~|~1~|~1~|~01/STR~|~This split is for the portion of SR 111 that is outside the Defiance Urban area. Funding is from district allocations using SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~2A67D3168C4EE30750D8F2BD86FA7214148291AC 83030~|~1~|~3~|~03/STR~|~"O3/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markings on FAI SR664 0-7.47~|~05 - 4R Maintenance - Resurfacing~|~2CC50CEFE25ECC27E4A9DB8D9DE57A2AB22A6DF9 83030~|~1~|~1~|~01/STR~|~"O1/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on FAI SR664 0-7.47~|~05 - 4R Maintenance - Resurfacing~|~6DCD51496A1A39EDD45B771C916310CA37890AB3 83030~|~1~|~2~|~02/NFA~|~"O2/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) FAI SR312 0-3.75; 2) HOC SR312 0-0.4; 3) PER SR312 0-4.99~|~05 - 4R Maintenance - Resurfacing~|~DC5112CB4EEB905EADCC0357A395DAD5DBA3FC7C 83030~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Resurfacing on 1) FAI SR312 0-3.75; 2) HOC SR312 0-0.4; 3) PER SR312 0-4.99~|~05 - 4R Maintenance - Resurfacing~|~DF0E7DA9F12B7E2060DAF2B7F52932FF418CA637 118164~|~1~|~1~|~01/SAF~|~Safety improvements along Harshman Road in the City of Riverside~|~21 - Safety~|~34A35E0EC5C32F636A182ADA8092EE5910817F67 100276~|~1~|~1~|~01/NHS~|~Single and Double Microsurfacing of STA-US 30-0.00 to 9.58~|~05 - 4R Maintenance - Resurfacing~|~27B190D60D5FCFAECD2184AC161B76472B61A772 96132~|~1~|~1~|~01/NFP~|~Material Storage Shed at the Peebles Outpost~|~44 - Other~|~C84D608C0A9CCC0AFDD2F643D201100748440F7D 105721~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~CD757245FCF8CED9B5080D2398C0628F9C7CFD13 123101~|~1~|~1~|~01/SAF~|~work for left turn lane~|~21 - Safety~|~426A7F2CDC636D32514DF4049CCDF5BD7D26C3CD 126946~|~1~|~1~|~01/ENH/KINS~|~New sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~65DC0B20993CFDD82A44B1BF297FCAEC20D8EC6D 95953~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority~|~44 - Other~|~2137C9D66D1FCEBC3A4E5CCEF2FA49002870AF86 126003~|~1~|~1~|~01/NHS~|~FUNDING~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A17A892BE27F5F665463583C6F7E8B8901FD7E43 126003~|~1~|~2~|~02/NHS~|~Urban Paving Part~|~05 - 4R Maintenance - Resurfacing~|~68EFB74B56724B2F1A6ABBE085E73E32117B0A23 94383~|~1~|~3~|~03/S<2~|~Fed/City STP<200,000 within Bucyrus corp. limits - CRA 98 5.50-6.80~|~05 - 4R Maintenance - Resurfacing~|~2A55473B38A66FBBC442A67FAD353AC6DD025D54 94383~|~1~|~5~|~05/NHS~|~Fed/City NHS within Bucyrus corp. limits - CRA 4 8.45-8.87~|~05 - 4R Maintenance - Resurfacing~|~2EA4FC84375C8FB4F94E9B03338BE611C8E18E89 94383~|~1~|~7~|~07/STR~|~Bridge Work:SFN 1702513 (CRA-98-4.27)~|~13 - Bridge Rehabilitation~|~607EFEAEF5F182F9CE35F5369DC1ED66B382B004 94383~|~1~|~4~|~04/S<2/BUC~|~100% City STP<200,000 within Bucyrus corp. limits - CRA 98 5.50-6.80~|~05 - 4R Maintenance - Resurfacing~|~74E2A63B628F1CA5D4C792429027444E242514C9 94383~|~1~|~1~|~01/STR~|~District Allocation 80/20 STP Rural - CRA 98 0.00-5.12~|~05 - 4R Maintenance - Resurfacing~|~B99673EBD2B1D5881E6F247DC967EBA3B2B045AD 94383~|~1~|~2~|~02/S<2~|~District Allocation 80/20 Urbanzied Area - CRA 98 5.12-5.50~|~05 - 4R Maintenance - Resurfacing~|~F27B2C106B57C97D90874C8022B01A2C8B9CE8C4 94383~|~1~|~8~|~08/STR~|~Bridge Work (length < 20'):SFN:1702548 (CRA-98-5.00)~|~13 - Bridge Rehabilitation~|~F370F15DFE9B6053DD61EAC6E717BC3ED13205EB 94383~|~1~|~6~|~06/NHS/BUC~|~100% City NHS within Bucyrus corp. limits - CRA 4 8.45-8.87~|~05 - 4R Maintenance - Resurfacing~|~F7D866AEC148D6774800087199B173EAD697B712 96752~|~1~|~1~|~01/NFA~|~Reconstruction of Lexington Salem Road from Engle Road to Preble County Line Road, including widening of the roadway to 28' (includes paved shoulder). Deficient culverts and bridges will be replaced or brought up to current standards. In addition, installation of new guardrail, RPMs, pavement markings, tree trimming, and reshaping of roadway ditches will be performed.~|~21 - Safety~|~79D34DF8ED13B12FAFFA47503D290295E5EBEF49 87067~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 729 in Clinton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~3CCF766A9739AD7090CFB991B8019753D6C83657 87067~|~1~|~3~|~03/STR~|~Plan split for work associated with bridge CLI-729-0285.~|~04 - Reconstruction - No Added Capacity~|~EA180ACD08E13321DC3A995149BB60CA3589497C 87067~|~1~|~2~|~02/STR~|~This plan split is to cover work associated with bridge CLI-729-0113.~|~13 - Bridge Rehabilitation~|~6206ECD2F1B7BE1AFB14E919C2B6CCB9D6E6F6ED 93376~|~1~|~3~|~03/NHS/Cant~|~Installation of sidewalks along 55th Street, East of State Route 43, in the City of Canton, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~40DA498F693C572BD887A5253AA3916E60B3C7F1 93376~|~1~|~2~|~02/ENH/park~|~Construction of a pedestrian/bike trail tunnel under State Route 43, in the City of North Canton, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~D49F85B6CF4D36D8A86C33EE20C9B036C70A48E1 93376~|~1~|~1~|~01/NHS~|~Widening of SR43 from 55th Street to Applegrove.~|~03 - Reconstruction - Added Capacity~|~FB705B9DB5CFA0357C4C6EA9D4D34D7A2CC7E50F 93376~|~1~|~4~|~04/NHS/NC~|~Reconstruction of waterline and installation of sidewalks along Maple and State Route 43, in the City of North Canton, Stark County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~9AE33A311B4B94C0C6DC5082F0D7B468C8C1E0CA 76835~|~1~|~1~|~01/NHS~|~Plan split for all major rehab work.~|~~|~4FC70B9EA2F167F10C9966B14F2D36083757781B 110190~|~1~|~1~|~01/STR~|~The COUNTY will construct improvements in front of the site along SR118 to include widening SR 118, 950' north to Carthagena Road, to include a 285' NB right turn lane and a 285' SB left turn lane in to the new facility. Additionally, 285' NB right turn lane on to Carthagena Road as well as one additional access point to the facility along Carthagena Road, 540' east of SR 118.~|~03 - Reconstruction - Added Capacity~|~0F86A5720CAF4B8518EF2215EA3065288B60717C 102144~|~1~|~1~|~01/NFA~|~The City is constructing road improvements, constructing approximately 2,177 LF new road from US 68 to east Cuba Road with new Ahresty access and closure of existing Ahresty US 68 access, public rail crossing with advanced warning devices.~|~01 - New Construction~|~2A5CE1D043E0A25BF6211625CE0240053F3FFED9 108376~|~1~|~1~|~01/MPO~|~Reconstruction in the City of Dayton.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~82C6E14923E96AC85602125936F521D6B5A3A212 114549~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~0052204BA11798FB83BF732A4850CD727161037C 114549~|~1~|~2~|~02/S<2~|~AC Overlay with repairs.~|~05 - 4R Maintenance - Resurfacing~|~1B35150E70A59A583B1DEE611F2801747FE82D89 114549~|~1~|~3~|~03/NFA~|~Ac Overlay with repairs.~|~17 - Construction Engineering~|~BBFC3027F0FDF00128CF051B14E97E1A805D4CC0 89876~|~1~|~1~|~01/SAE~|~Construction of bicycle/pedestrian crossings on Easton, Schneider, and Marquardt, as part of Hoover Connector Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~60FB00083C985BEB604876FA868321B7C1D762E7 118241~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items~|~21 - Safety~|~10BBE80E9767268F19C357FA15855E31AC103882 100849~|~1~|~1~|~01/NFA~|~LAW 217 13.59-17.47~|~05 - 4R Maintenance - Resurfacing~|~BA227E16BB942C9A3B3CE3392AF5C7F996547D2D 100194~|~1~|~1~|~01/S>2~|~All eligible urban paving items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE89F11B69CC8E37117E6ADE9F0DD5F8D2A3FBE7 100194~|~1~|~2~|~02/NFP~|~For urban paving ineligible items (curb, curb ramps, sidewalks, full depth repairs,...)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B7CA2ED729F932E94AE4E8F97FE5BE238C942599 105887~|~1~|~1~|~01/S>2~|~Plan split for urban paving resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6BB50A3C5DA9BCA57EEC4AAAB58CDEC128F04A5F 105887~|~1~|~2~|~02/NFP~|~Split for 100% local items of work~|~05 - 4R Maintenance - Resurfacing~|~0AEB025BFD55C22C36038F772D29916EA2D15BD4 95522~|~1~|~1~|~01/IMS~|~Perform abument patching, pier patching, backwall patching on various bridges. This split includes: SFN 5703581 MOT-048-0448.~|~13 - Bridge Rehabilitation~|~3A63B34FE5A4890E9FB4BE3EBEFC05B6887F816B 95522~|~1~|~2~|~02/NHS~|~Perform abument patching, pier patching, backwall patching on various bridges.~|~13 - Bridge Rehabilitation~|~E68C8457DD16538C93E26F2106C4EB6B25589506 86852~|~1~|~2~|~02/SAF~|~100% local participation items.~|~21 - Safety~|~3C2CD60E72E6719FCC33F67D226E2C759209FD2D 86852~|~1~|~1~|~01/SAF~|~90% Federal / 10% State Safety funding split~|~21 - Safety~|~B972CC69CE68599D7862536DA6FB004919023F32 113999~|~1~|~1~|~01/NHS~|~Culvert and wall replacement along JEF -7~|~04 - Reconstruction - No Added Capacity~|~CF91D388441E05C93D1511A01C1713B238CC2531 120355~|~1~|~1~|~01/NHS~|~Districtwide signal repair/maintenance.~|~21 - Safety~|~B1905A52B97F0A57A595B1AE01F8C8D4B56D8E01 115058~|~1~|~1~|~01/NFP~|~Split for cracksealing work~|~99 - State Preventative Maintenance~|~1F3914F49A58CDE4E5EB295B2752196F0CD91D81 104098~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Athens County. CEAO funded. Funded 100% federal.~|~21 - Safety~|~05AF03EFA6CAB1E6B917ECE60DA832642B57699D 114094~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~58FFC4A8A594531CE8DEC6AAC27E95956A04B13C 124947~|~1~|~1~|~01/STR~|~Plan split for resurfacing Other Federal Aid Rural roadway with district preservation funds~|~05 - 4R Maintenance - Resurfacing~|~36BE974BB78F3D56BFBFE97EF828243046D391E2 126299~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~047D914D22E71F9C9C64D2A21B1A17BC37B9B163 126955~|~1~|~1~|~01/IMS~|~I-75 NB auxiliary lane~|~03 - Reconstruction - Added Capacity~|~49FF5226D59396F8517EA8C75BDD260473CAD0A5 116066~|~1~|~1~|~01/STR~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~CAAE1227F3DDCB5E612F7334FFE9DFB9BC28A37A 116066~|~1~|~2~|~02/S50/HEAT~|~Resurfacing and related work in the City of Heath.~|~05 - 4R Maintenance - Resurfacing~|~26F04ECAE3DF24F29AE03E71F4F24FF8F1EEED37 110791~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4FE327455F9AFDF39FFB3E4FCE7E891DB734F84D 94683~|~1~|~1~|~01/NFP~|~Rest Area Roofing - Purchase Order contract~|~44 - Other~|~C5513BE9834FA3F818BDE0D2EF9CB09200EC26C1 114399~|~1~|~1~|~01/NFP~|~This is the district's systematic RPM replacement maintenance contract of prismatic reflectors that have lost reflectivity or are in need of replacement.~|~21 - Safety~|~0276FDE6C1A6B1CC681020995F2215BBBED46BBB 100081~|~1~|~1~|~01/STR~|~Bridge Repair:ASD-SR-89 04.280 SFN 0303453 (OVER JEROME FORK)Minor Rehabilitation ? Str steel repair (022) ERI-SR-13 03.670 SFN 2202409 (OVER N&S RR ) Reactive Maintenance ? Bearing reset/repl (025) Minor Rehabilitation ? Str steel repair (022)HUR-SR-303 01.930 SFN 3904083 (OVER VERMILION RIVER)Minor Rehabilitation ? Str steel repair (022) ~|~13 - Bridge Rehabilitation~|~D1D020181573B2AB36D5BF8862C09F56851F4492 100081~|~1~|~2~|~02/NHS~|~Bridge Repairs:ERI-SR-2 24.030 SFN 2204738 (R OVER ERI-137-0489 TH)Reactive Maintenance ? Deck patching(conc) (049) ERI-SR-2 06.180 SFN 2202824 (OVER ERI-002-0624)Reactive Maintenance ? Bearing reset/repl (025) ? Exp jt repair/repl (048) Minor Rehabilitation ? Str steel repair (022) ? Bridge railing upgrade/repair (061) Repair parapets. HUR-US-250 04.900 SFN 3901149 (OVER HUR-20-1349)Reactive Maintenance ? Deck patching(conc) (049) ? Exp jt repair/repl (048) LOR-SR-2 03.320 SFN 4707923 (L OVER BAUMHART RD CH-51)Reactive Maintenance ? Bearing reset/repl (025) Jack and Shim bearingsLOR-SR-2 03.320 SFN 4707915 (R OVER BAUMHART RD CH-51)Reactive Maintenance ? Bearing reset/repl (025) Jack and Shim beam bearings~|~13 - Bridge Rehabilitation~|~F7521D302F3CF11AC26FCDBDAA5BBD35E8FAED66 122320~|~1~|~1~|~01/IMS~|~Plan split for deck replacement and miscellaneous repairs to Berea Freeway bridge.~|~13 - Bridge Rehabilitation~|~493F5C0924A0DECC7F7710069C45DF959AAF8B6A 120726~|~1~|~1~|~01/MPO~|~Construction of new trail to connect the Great Miami River Trail between Timberhill and Rockdale Road.~|~28 - Facilities for Pedestrians & Bicycles~|~DF8EE9B55F40E2E0C5CD6ED3DB2E4C333185D4EB 101412~|~1~|~1~|~01/IMS~|~DSR# BEL-013~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~61975AD3B85ED955E398D9BA13F5768A4DC28D46 116447~|~1~|~1~|~01/NFP~|~Systematic Guardrail maintenance and repair on various routes throughout District Four.~|~21 - Safety~|~C912B1CC97ECA8C28A50AED2065F3D0AAAB6DD2F 116275~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~F20DE5E06BC83C77FD9E3136616BC9F931CD24E7 119424~|~1~|~1~|~01/NHS~|~Plan split for sealing of mainline SR 126 bridge decks in Hamilton County.~|~47 - Bridge Preventive Maintenance~|~27EDA096A68E299736C07EE55E48A67BAE6C15A0 119424~|~1~|~2~|~02/IMS~|~Plan split for sealing of bridge decks on IR-71 and IR-75.~|~47 - Bridge Preventive Maintenance~|~998007F0733C99F965D8EBE0C726CEC1D393DA55 87687~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 4304713~|~13 - Bridge Rehabilitation~|~22A29D3B0F8025297FF7704B0276ED3FF832A37D 111662~|~1~|~1~|~01/MPO~|~Split for project eligible work~|~05 - 4R Maintenance - Resurfacing~|~1106C5C5FA0E699DC603F7F773DD96EF988E79A0 105538~|~1~|~1~|~01/S<2~|~Urbanized Area Plan Split: PIC-188-2.57-2.62~|~05 - 4R Maintenance - Resurfacing~|~9CB9B8C8AD8D16C6ED6120E4BFAE75AD5F07624C 105538~|~1~|~2~|~02/STR~|~Rural Plan Split: UNI-37-12.24-12.77~|~05 - 4R Maintenance - Resurfacing~|~53155682522A7A44A54B1769F07CD712E88FA314 107991~|~1~|~1~|~01/MPO~|~Replacement of 3-span bridge, replace traffic signal, resurfacing on local road.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2C639EAFBEE686AA5A0FB470D47822CF7DDE2225 112313~|~1~|~1~|~01/IMS~|~Construct a Texas Tall Wall type barrier along the outside of the ramp curve to prevent trucks and large vehicles from leaving the roadway or overturning on the exit ramp from EB i-70 to NB i-75.~|~21 - Safety~|~B6B1564B49B5DD8482C0451771CF165200C2D396 112313~|~1~|~2~|~02/SAF~|~Add chevron signs to Ramps A, G, C, & E~|~21 - Safety~|~5185D5F3256DF743B121005FF1C57BE9757E8335 124333~|~1~|~1~|~01/SAF~|~Intersection improvement~|~21 - Safety~|~CD115F601F607A74ABDCE001B680AED63192E055 126652~|~1~|~1~|~01/STR~|~Replace bridge~|~10 - Bridge Replacement~|~F7334AC3C0CE143220157D492B52C6B2C2152DA3 113590~|~1~|~1~|~01/MPO~|~TLCI Work~|~28 - Facilities for Pedestrians & Bicycles~|~F952CCBB58BE5D0CA597D1A1ED782F35E7BF03E4 90821~|~1~|~1~|~01/ENH~|~Multi-use path and new bridge over US-23Sponsor is Orange Township01/ENH/OT/~|~28 - Facilities for Pedestrians & Bicycles~|~DD532E86D0A5B83FE0C791F4FBCCA638FB27722E 122470~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 39 over Killbuck Creek.~|~10 - Bridge Replacement~|~8B689B4287CA6995EDC94D16B2449635CD1C7809 123506~|~1~|~1~|~01/S50~|~Plan split for STBG eligible construction items. ~|~28 - Facilities for Pedestrians & Bicycles~|~76D9EF812F8F2A328272EB20505ACE2EE2BB56FB 93304~|~1~|~1~|~01/SAE~|~Plan Split for Battery Backup for various Traffic Signals in MAH and POR counties.~|~21 - Safety~|~3007B31C3FFB8DD2B7B85D7575210E40EB72B8F7 108178~|~1~|~1~|~01/IMS~|~ER event - Repair landslide that occurred.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B694B86BC084783E464D87C5445B7494A7B71AC 121385~|~1~|~1~|~01/SAF~|~Plan split for pavement markings~|~21 - Safety~|~9881DF11DBCFCC803A40C866CE3B8BE2698452A2 92435~|~1~|~1~|~01/NFA~|~Bridge replacement project. Replacement of a steel beam span on stone abutments. MEG CR 35 3.75, SFN 5334020. 80% Federal/20% Local.~|~10 - Bridge Replacement~|~7163EE1ADE6CC41F17927837698E16C5801EF7C9 117778~|~1~|~1~|~01/NFP~|~Resurface Parking Area/Access Road.~|~04 - Reconstruction - No Added Capacity~|~4E7C8633A28B137A95C9E4D672D8248D93A5F984 107476~|~1~|~1~|~01/NHS~|~Double Microsurface the existing pavement~|~05 - 4R Maintenance - Resurfacing~|~C9E2CDAE8B216568D947B7265840DBAA1D843842 107476~|~1~|~2~|~02/NHS~|~100% State reinforced concrete pipe that the state is purchasing from the contractor. This is for change order 12-reason code 40 material cost reimbursement~|~~|~6D8DD6CA47D0E89B3AC52DA8D044EA3B3A1167CD 101724~|~1~|~1~|~01/NFA/CCEO~|~Coshocton County Engineer's CEAO Bridge Funding - 4B87 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of SFN 1630407 COS-CR12-00.20 Intersecting Turkey Run - Length= 32' Width 24.5' / SD/FO=0 / SR=50.6 / DSR=5~|~10 - Bridge Replacement~|~C233B495A817F7BD5975EBC17E7D3AF243974F67 123248~|~1~|~1~|~01/S5K~|~Pavement markings.~|~21 - Safety~|~F349B32DFA9645582D5D484030FFE4D829B46AD4 102232~|~1~|~1~|~01/IMS~|~Plan split for deck replacement~|~13 - Bridge Rehabilitation~|~93E62913B918B3E797164F7663F155F6BFEC9658 105086~|~1~|~1~|~01/BRO~|~All work in this split. All funds from the District Preservation Program budget. No local funds.~|~10 - Bridge Replacement~|~E0593863CA6B93C288170BC80465C06646B950D1 92514~|~1~|~1~|~01/SAE~|~A local-let Guardrail project on various county roads.~|~21 - Safety~|~AD48639B47B1F37EF5753C46F379AD2C89029379 125926~|~1~|~1~|~01/S>2~|~ITS Maintenance~|~44 - Other~|~B287C059B6EA12596D4F0BDC3B3B69D71245368B 113424~|~1~|~1~|~01/SAF~|~Recessed-Wet Reflective Pavement Markings on VAR routes in D9~|~21 - Safety~|~FCB222B3E59017CCF99DB5AE558B716B2F62111A 113424~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~F07B0A84AAD87A308817BB5A31D66B2C397876D8 91071~|~1~|~1~|~01/IMS~|~Bridge maintenance project, including: expansion joint repair, bearing re-set, slope protection, deck patching, deck sealing, beam end painting, substructure patching.~|~13 - Bridge Rehabilitation~|~D6D24B5AD27CE9430C7C7F508B7F564EB1408987 94625~|~1~|~1~|~01/NFP~|~Long line pavement markings in Portage, Stark, and Summit Counties, Ohio.~|~21 - Safety~|~CF80805DA06CF24E55480EF0CAE189F7D64905F4 102399~|~1~|~1~|~01/STR~|~1" 424 FGP~|~05 - 4R Maintenance - Resurfacing~|~700414617024F5A5A30029D8CC998CCB87EBC4AF 86150~|~1~|~1~|~01/BRO~|~Bridge deck replacement for ATH 329 1494, SFN 0503606. BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~CD953ED8BF3F041D15A357EA42430FB328CA54C1 88350~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds: 1805045~|~13 - Bridge Rehabilitation~|~636C45843F48AFE1ACF01C2697A1C6DFF81F02E2 108358~|~1~|~1~|~01/STR~|~Pavement repairs and crack seal on rural routes: MER US 127 SLM 14.93 to 26.13 MER SR 49 SLM 13.90 to 21.45 MER SR 119 SLM 12.89 to 17.01~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDD7B51512F019243C3FA28584B37AFF3D2CEA37 123326~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~927D94C90FB468C52B7A074FE91CE2E8CCA78946 123326~|~1~|~2~|~02/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9AACCC79A39D0EBC34E0C40B860FC999BAC6C1DF 123326~|~1~|~3~|~03/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~BBBD9FA503BA0494C43DFF50317C8E50336D26B2 123326~|~1~|~4~|~04/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~2727613B6D30DC8E90953D59BC911A59200DC67E 123326~|~1~|~5~|~05/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~83A98E6827C762CD20ED40BC4C6196591F579B49 101201~|~1~|~1~|~01/SAE~|~Implement various countermeasures to improve safety of kids walking and biking to school including installing a Rectangular Rapid Flashing Beacon (RRFB) at Fourth & Sherman.~|~28 - Facilities for Pedestrians & Bicycles~|~1630214143C691C3987CA3830EC17F33736BC8ED 97575~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. CLE-CR 45-0326 (SFN: 1359495) in Clermont County.~|~10 - Bridge Replacement~|~CF9F0ED25DA0F34B4461C0FE4090E85195E63D6A 93063~|~1~|~1~|~01/S<2~|~This split is for work eligible for funding with STP funds from the City of Findlay budget.~|~44 - Other~|~D1D0F958786678FE0F486D2F7E258738815A9516 103755~|~1~|~1~|~01/SAF~|~Add thru lane on SR 32~|~03 - Reconstruction - Added Capacity~|~DAE5B7FD973300A4294CF333654E9574E2754893 103755~|~1~|~2~|~02/NHS~|~Resurfacing on a portion of SR 32 in Clermont County between I-275 and the eastern Batavia Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~A6645D22A47AE4C6F881FA9DC12641CAB641197E 103755~|~1~|~3~|~03/NHS~|~Repair median barrier wall on SR 32 at approximately 8 mm. that was not in the scope of workRepair potholes that were not in the scope of work.~|~21 - Safety~|~A6B8F1B853CF7AA9ABC06D12B2207C2C8408D24A 115466~|~1~|~1~|~01/NFP~|~Pavement repairs to Shawnee Prairie Reserve ~|~05 - 4R Maintenance - Resurfacing~|~E163417F9DA312BB00F91B4173198DD9C693EF84 113762~|~1~|~1~|~01/STR~|~Systematic Sign Replacement.~|~44 - Other~|~7A28585D94B0F737A86397F79D7C0F1AF11BD3D3 123516~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~37EAB4AC76CD515D3855CB801EB7AF929D5D5E53 92937~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~25FBEF72F30974FBE2B6A5BB1508D948688F00D5 120415~|~1~|~1~|~01/S5K~|~Small City funded scope to reconstruct SR-53 (N Sandusky St) from Hall St to Tomb St.~|~04 - Reconstruction - No Added Capacity~|~E423C71F1BBEB677B2158BF8B785FA4D279CEC79 120415~|~1~|~3~|~03/S5K~|~Urban Paving funding for Tomb St to City Limit~|~05 - 4R Maintenance - Resurfacing~|~ADE353FB7651E49B32B17828FFF9960FE8CA2A78 120415~|~1~|~2~|~02/SAF~|~Safety-funded scope for intersection improvement and access management.~|~21 - Safety~|~E75AADA43DD6000C70E7447F38E2E5AFCBB7DB84 120415~|~1~|~4~|~04/NFP~|~100% Local costs for Urban Paving project areas (full depth repair, curb, etc.)~|~05 - 4R Maintenance - Resurfacing~|~2A7FE4F14DD1690C9F58FF8B26BE1F1CD194A0A4 125442~|~1~|~1~|~01/BRF~|~Replacement of the South Patton Street bridge (SFN 2960168) in the City of Xenia.~|~10 - Bridge Replacement~|~23C72540B49943164E8A56724E68F21B5DCD9C8B 98210~|~1~|~1~|~01/NFP~|~District Preservation Culvert Funding - 7BPB (100% State) - See CAP Comment - Various locations in District 5~|~04 - Reconstruction - No Added Capacity~|~CBC9AA9A9527D0C117A8DFDD9DBC3CE5D29059A7 93915~|~1~|~1~|~01/S>2/TOLE~|~SR-184 from Lewis (SLM 6.49) to Telegraph (SLM 7.48) from curb to curb up to 3.5" deep.~|~05 - 4R Maintenance - Resurfacing~|~9293CE030D23F9580E7E05DC159ABB21CAC6D208 93915~|~1~|~2~|~02/NFP/TOLE~|~SR-184 from Lweis (SLM 6.49) to Telegraph (7.48) all work outside the area between the curbs and deeper than 3.5"~|~05 - 4R Maintenance - Resurfacing~|~E8E0488EFE35A4548030598DF3DCAADE9455E28D 99639~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~F0EAF1E3A5A3B1A3B312FBE2FF1A3D8620D8C053 107738~|~1~|~1~|~01/STR~|~Landslide repair project, ATH 78 4.13-4.22. 100% Federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BE16CA76DB8839107E8613765A7670ABB164BCD4 105021~|~1~|~1~|~01/STR~|~Landslide repair project funded by GSM program. MRG 60 10.44-10.49. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~120E446171024899549D46DC6DFAFF3F2E9596CD 119452~|~1~|~1~|~01/S5K~|~added plan split.~|~21 - Safety~|~0ECD10F5B26462BDDE3EC3831A3D48FB1356BE10 107165~|~1~|~1~|~01/SAF~|~Install RCUT intersection at Eastern Road in Norton.~|~~|~08A5ADFCE788AAFE442B8BE5B418F00BF3DCF6A0 107165~|~1~|~2~|~02/NHS~|~Resurfacing of WAY SR 585 from 18.47 to 18.63 and SUM SR 585 from 0.00 to 0.13.~|~~|~A9C38F378C36DE3C789F66C1B174566C1F768817 105746~|~1~|~1~|~01/NFP~|~Plan split for non-federal paving work ~|~99 - State Preventative Maintenance~|~CB55DCAE977BC6823B126F9D3CC1E090F9B68D29 85172~|~1~|~1~|~01/MPO~|~Replace existing deck, sidewalk, and railing, paint existing steel beams and convert abutments to semi integral abutments on Bechtle Avenue over Buck Creek.~|~13 - Bridge Rehabilitation~|~C1837193CEC178B4AF6E8D197C34AA0FCBDB391B 117929~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-E~|~63 - Electric Vehicles & Charging Infrastructure~|~58353B75AB287C9408639B34C39B661A52B429B0 100292~|~1~|~1~|~01/STR~|~JAC SR279 9.88~|~04 - Reconstruction - No Added Capacity~|~678A12C0C41889B373F5D87CBA45AA2B02A6B366 120785~|~1~|~1~|~01/SAF~|~Add a turn lane and signal improvements at Refugee and Hines Road within the City of Columbus ~|~21 - Safety~|~8C82E44DF213F4AEB5688BBD3B6FA8B2EED7E1D9 120785~|~2~|~2~|~02/S>2/RR~|~Railroad crossing improvements to be built by the railroad company.~|~22 - Rail/Highway crossing~|~E93AEB4A80BFEA91A4CA3317CD231E5DB68BDCB8 120785~|~3~|~3~|~03/S>2/COC~|~100% locally funded items, including drainage items that go above and beyond the ODOT standards for what is needed.~|~~|~5D193D3CF36004157825AA29F633D9462E45F4EE 99479~|~1~|~1~|~01/MPO~|~Landslide repair project. WAS 676 24.00. Work includes upgrading the storm water drainage system, sidewalk, curb and gutter. Upgrade of the guardrail and resurfacing. MPO funded at 80% federal and 20% local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B7647C0B8E771FBF0D5847CB0F2FA429A8D319AD 116051~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance~|~17 - Construction Engineering~|~3E71D454984F65E68335639668BF18C69BEED616 86586~|~1~|~1~|~01/STR~|~0800368 BRO SR41 0.89 Intersect: Fishing Gut Creek BR eligible only for rehab. This is project is to replace the brdg. 01/STR/BR/State~|~13 - Bridge Rehabilitation~|~999E5E8A259384BA72935E3A4014E0D0E6535779 105898~|~1~|~1~|~01/S<2~|~Fed eligible~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~404E8199BE356C78373E9B00D47707B38C9F1DB2 105898~|~1~|~2~|~02/MPO~|~Plan split to pay for both 100% locally funded items (Reference 9) as well as any over the cap construction costs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54CF4C7964ED6AF99898FF619CE5D15DD01B2BF5 96658~|~1~|~1~|~01/BRO~|~Work involved with a bridge on US 68, SFN 3202046, which is in the Findlay Urban Area. Funding is 80% federal funds and 20% state funds. Funds are from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~5E583D964227301CEC5FE8AD5A8C8570A89F0264 96658~|~1~|~2~|~02/BRO~|~Work involved with bridges on SR 12, SFNs 3200124 and 3200140, which are not in an urban area. Funding is 80% federal funds and 20% state funds. Funds are from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~DD3C8D996946671AF26DC1E825099FF1D7B49960 95516~|~1~|~1~|~01/MPO~|~MORPC/Worthington funding for widening of Worthington-Galena Rd~|~04 - Reconstruction - No Added Capacity~|~04AB648C0056E87E4031239BC69EE7D5C433551C 95516~|~1~|~2~|~02/S>2~|~Items to be paid 100% by the City of Worthington~|~04 - Reconstruction - No Added Capacity~|~CEC61001D9D17B7CA8894ADA71DE242C9671F46B 95516~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~0F22A089B09F5EC5126DA00956AB9701063535CA 120898~|~1~|~1~|~01/SAF~|~Sign replacement.~|~21 - Safety~|~DFC386F1540D009085D81BD2363254E85D3A20F8 81721~|~1~|~1~|~01/NHS~|~Microsurfacing of BEL-7-17.74 to 19.75; includes double microsurfacing, pavement repairs and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~13D2C6D692BC30AC547CB14110C23CDE84198060 114925~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D46F98209FD0FC5B82B982F90FCBEC0067837C52 114925~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7D7C4DB5C282B2BFD3138FA4864A8FAC53B46994 114925~|~1~|~3~|~03/NHS~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~D2EA473C70DABA7E5F56821B627FCD45BD9F9FF6 114925~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~D5312CF82B3C022161B1E093D5679561C0E5CDEC 98317~|~1~|~1~|~01/NFP~|~Districtwide raised pavement marker contract~|~44 - Other~|~5AE3A70FDDABE7B38695337BCC7A28FA50CDD732 126574~|~1~|~1~|~01/NHS~|~Plan Split for maintenance work on Major Bridge~|~47 - Bridge Preventive Maintenance~|~19ED1713DCF2C024A1F5651831E47705891E2801 119397~|~1~|~1~|~01/S>2~|~Roadway narrowing, bicycle & pedestrian enhancements.~|~28 - Facilities for Pedestrians & Bicycles~|~FCAB5181A6B83438739C0AAD0B786E82CD5AE585 96182~|~1~|~1~|~01/NFP~|~Mowing contract~|~44 - Other~|~C136D9ECC7D4DB24167A0607408A8DE8D6169894 110309~|~1~|~1~|~01/NHS~|~Turn lane additionBRO 32 11.93~|~21 - Safety~|~4F9FD67E133C0542ED1CA3A658810ACBCA31C609 102701~|~1~|~1~|~01/MPO~|~Removing thru lanes on E Exchange St between Broadway St and Fountain St, includes adding bike lanes, parking spaces, median and signal upgrades.~|~28 - Facilities for Pedestrians & Bicycles~|~7B2FE964E22A83904B86CDEEDFBD047D885E43AC 109917~|~1~|~1~|~01/SAF~|~Safety project at US23 5.49~|~21 - Safety~|~D24AD871BF06436AEAA155338AAEE9E2E750389B 114581~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 376 15.95. Work includes drilled shaft walls.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FD1923100F67EEC1F9A2623DE83630BAEA2036D3 90571~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~04 - Reconstruction - No Added Capacity~|~41EABC733CC4520047BC15D093B3A85E928BD875 109049~|~1~|~1~|~01/SAF~|~New signal funded by ORDC 90% Federal 10% GRF/TRC.~|~22 - Rail/Highway crossing~|~E5FB5B04F25D18BAD9E8852D1F7DDC1858F25D1D 91770~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. GAL 218 16.46-17.14. Urban other federal aid funded Federal 80% and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~3AA2062F25F6A802181482EC1F75FFA92D83EEEA 91770~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. VIN 50 10.68-16.34, VIN 93 7.47-10.25 and GAL 218 11.62-16.46. Rural other federal aid funded Federal 80% and 20% State.~|~17 - Construction Engineering~|~A55713A570B855EBD6A0CA61CD132A292B2CB423 97114~|~1~|~1~|~01/BRF~|~The replacement of SFN 3942562 and 7260261.~|~10 - Bridge Replacement~|~7406B2A2ADC884B0CC429F9D53D60561FA842E30 117396~|~1~|~1~|~01/NFA~|~CEAO LBR bridge funding ~|~13 - Bridge Rehabilitation~|~086CCABDF9AFEC739421B17211351BC5B41F7D49 110724~|~1~|~1~|~01/S<2~|~Landslide repair from OH19-01 ER event.~|~~|~951603A35F9328096C2A36624CF699F281236B10 108943~|~1~|~1~|~01/CMQ~|~Signal upgrade work eligible for federal-aid~|~24 - Traffic Management Engineering - HOV~|~C09E47CE84083033D4F9DB11258D059E5F004CCF 107327~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~105E8A94F2EDCBB170E1BB128F958EF186897FD4 113626~|~1~|~3~|~03/NHS~|~Split added for CFN 1985229, to be funded with district preservation funds instead of ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E2ABA86AD88354EC9C13F57860CB6F6C36911609 113626~|~1~|~1~|~01/NHS~|~Rock slope repair funded by OH20-01 ER funds. Work is from SLM 14.41 to SLM 14.61.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C62EC5B046CCEB4040C0FA018A51199E4C2FD5B 113626~|~1~|~2~|~02/NHS~|~Slope excavation work for southern end of project beyond what is covered by ER funds. Work is from SLM 14.32 to SLM 14.41.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~52A9A338F84AF073F8C206F670DA80A5AF41D932 114440~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~1D09EFD7751AF953F707DA2C5918936CFE7FF220 90913~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~7A70E9303A5615E655E350BC7F7212C25A50A5A0 100677~|~1~|~1~|~01/S<2~|~Resurfacing JEF-213 from SR 7 to SLM 2.16~|~05 - 4R Maintenance - Resurfacing~|~76B328A336AB23B7031491E42E2AEAA03540F05B 100677~|~1~|~2~|~02/STR~|~Resurfacing JEF-213 from SLM 2.16 to SR 152~|~05 - 4R Maintenance - Resurfacing~|~075E41816D9FE906FDD5E6FAE2C1BE71F3357A86 82662~|~1~|~1~|~01/BRO~|~ Replace structurally deficient steel truss bridge over Muddy Creek located .55 mile East of Hillside Avenue. Hamilton County.~|~10 - Bridge Replacement~|~E7FBE38E81991DEE5E84372822BD7A292637171E 97978~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2020~|~21 - Safety~|~581C8B463449656887FDB8CAF1E3F1E82CFFDB41 121399~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 147 over Branch of Leatherwood Creek.~|~13 - Bridge Rehabilitation~|~B081C1434AB4952B5C9ACAD960CC0D6E58563D62 98311~|~1~|~1~|~01/NHS~|~Fast dry pavement marking contract throughout Distrixct Six~|~44 - Other~|~641123B5F6E5E3A532346811E373E7ED7AB93D9D 91068~|~1~|~1~|~01/STR~|~STP Rural funding for culvert work at 4 locations: DEL-61-5.10 MRW-314-0.41 MRW-314-0.61 MRW-19-4.85~|~05 - 4R Maintenance - Resurfacing~|~9E126239CF55544837FA667DBB0037998FDBE14B 82594~|~1~|~2~|~02/SAF~|~Plan Split for SFN 7752121 SUM Canton Road over Cornell Creek~|~~|~590DC0DDF8EA486FA3D57FF1D6A1194516B3DB4D 82594~|~1~|~1~|~01/SAF~|~Plan Split for Widening SUM Canton Road (CR-66) from 2.32 to 3.30. From Sanitarium Road to Waterloo Road, Springfield Township, Summit County, Ohio.~|~~|~74C94B139B48E36A31572515659138856FFC8DED 114845~|~1~|~1~|~01/SAF~|~Construct new roundabout at Old Forge and Mogadore Rd intersection.~|~~|~740A7C021D0983B97815E80CA77959490517ECA0 125300~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate~|~~|~67E8B98609919765D05A63CF12AB1187F28A565A 88968~|~1~|~1~|~01/CMQ~|~Plan Split for SUM Copley Road Signals~|~21 - Safety~|~65E1AE4D7472C4739952E53CB30FDAE3732E4440 88968~|~1~|~2~|~02/NFP/AKRN~|~In-eligible signal items.~|~21 - Safety~|~E87202189E004796381736D1653B07AD97A10259 121443~|~1~|~1~|~01/STR~|~Plan split for resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8D18EFCDCFD40DDF56CAA66056E7CB864BD33721 96550~|~1~|~2~|~02/S<2~|~Resurfacing of ATB SR 84 from 2.14 to 2.24 and 2.60 to 2.74 and ATB SR 531 from 0.00 to 1.98, includes guardrail replacements.~|~05 - 4R Maintenance - Resurfacing~|~3A8F033C2AB876121DD0A3859C40A6A54584AB5E 96550~|~1~|~3~|~03/S<2/GENE~|~Resurfacing of ATB SR 84 from 2.74 to 3.85 urban paving within the City of Geneva.~|~05 - 4R Maintenance - Resurfacing~|~AAA185A86E1842F4124A2C677D8080B7D7B58F8E 96550~|~1~|~6~|~06/STR~|~See linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~F2C6BF2D3ABF9CA44000FC465BDA82E329CD9564 96550~|~1~|~5~|~05/S<2~|~See linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~36A48D7B63E4C17A784EB2CD241C6EDC1575DFFD 96550~|~1~|~4~|~04/S<2~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~115819D1CAC96E7DFEC3490EC5C07A1DB72176F2 96550~|~1~|~1~|~01/NHS/GENE~|~Resurfacing of ATB-US 20 from 2.94 to 3.95 urban paving in the City of Geneva.~|~05 - 4R Maintenance - Resurfacing~|~17BD56BD9A93620694E79421035A8C5ED10011FA 120926~|~1~|~1~|~01/SAF~|~Traffic signals.~|~21 - Safety~|~860980A506DF60EF0737DE67B9CB8C1F16D54A46 113997~|~1~|~1~|~01/SAF~|~Safety improvements on CR 3 (Nelson Avenue) from SLM 2.89 to 3.29.~|~21 - Safety~|~FBFC54B744B32650E913E8C54D4BBCF63CDC7D6E 107162~|~1~|~1~|~01/STR~|~"01/STR/OT/ " - No CAP - 80% Federal (4SF7)/20% State (4SS7) - slide repair on PER SR 13.~|~~|~671BBC0165EDEC0B24EDAB625A0071D4C453B980 117629~|~1~|~1~|~01/NHS~|~added plan split.~|~13 - Bridge Rehabilitation~|~AA044CFEE2A4E751620C2948F2EFAD37DEB7C9D0 103266~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers.~|~21 - Safety~|~CED629DF488CDFA8498D71D23ABD115ADA2E42A3 103162~|~1~|~1~|~01/NFP~|~Plan split for bridge work designed under this PID (Part 1)~|~47 - Bridge Preventive Maintenance~|~2F322D1B44E0EDA23DE4E2A4C1FECD767E19466D 103162~|~2~|~2~|~02/NFP~|~Split 2 for work on Mastick Rd, W.220th St, and 480 over CSX. (Part 2).~|~47 - Bridge Preventive Maintenance~|~BEEE075E7CA20B46BE6261B2973DF13465B0A37E 127111~|~1~|~1~|~01/SAF~|~Multi-lane roundabout at Fisher Rd and Hague Ave~|~21 - Safety~|~EABA3B21D5A2BD3FE5A2A5F90A941EAB6F9ECB86 107331~|~1~|~2~|~02/S<2~|~Resurfacing projectHIG CR 98 (0.56-1.04)~|~05 - 4R Maintenance - Resurfacing~|~0B6241FCC381FC3E4A0AED51F34E3FD643195B2E 107331~|~1~|~1~|~01/STR~|~Resurfacing VAR CR.~|~05 - 4R Maintenance - Resurfacing~|~6862D83B64B3129C2B61A14EB0E18F5F0C13ECAD 99712~|~1~|~1~|~01/NFP~|~Lighting maintenance and repair along various routes in Portage, Stark, and Summit Counties.~|~21 - Safety~|~7EEDE35EDC86F883D9F492FA421181D8A51BEDD5 99712~|~1~|~2~|~02/IMS~|~Reconstruction of assorted median lighting along IR-76 in downtown Akron, Summit County, Ohio.~|~21 - Safety~|~E969A21A24309E6B034F0219FE488AC911A4B139 90912~|~1~|~1~|~01/NHS~|~ASD US 0224 11.12-Install a structral liner in twin bridge culverts.~|~04 - Reconstruction - No Added Capacity~|~89121011ADE14BEECB3E8D143D41C3568828A306 77478~|~1~|~1~|~01/IMS~|~Resurfacing~|~~|~514F09DF5E6A9B08E17B5280A7B5B0D96BF20F7C 86885~|~1~|~1~|~01/NHS~|~resurface FUL US20 0.99-10.76; CR-27 to SR 108and smoothseal WIL-20~|~05 - 4R Maintenance - Resurfacing~|~D3188CBB80012AAA6467EA8937433E48F98D4D7F 86885~|~1~|~2~|~02/NHS~|~For 6 bridges on US-20~|~13 - Bridge Rehabilitation~|~B07CB12BDE6CF255EE88838F14CC156889720D67 121979~|~1~|~1~|~01/STR~|~Provide sidewalk, curb bump outs and RRFBs along SR's 161, 347 and 739 in the villages of Broadway, Raymond, Irwin and Milford Center in Union County~|~21 - Safety~|~448274A7DDE932098D6A2B0E6DB10937DB427EAE 25354~|~1~|~1~|~01/IMS~|~Planning Split for any bridge work included in the project. Assumed 70% of the total cost.~|~04 - Reconstruction - No Added Capacity~|~53D394742C074E45DB98F9B6212100AFB4BD5EF3 25354~|~1~|~2~|~02/IMS~|~Planning Split for any roadway work included in the project. Assumed 30% of the total cost.~|~04 - Reconstruction - No Added Capacity~|~CC4C41E6247F7C2168060C74D5EFC3AF5C8CAEDD 100413~|~1~|~1~|~01/NFP~|~Reconstructing Industrial Prkway, E. Bluegras Drive and widening the intersection of Industrial Prkway and Republic Street~|~03 - Reconstruction - Added Capacity~|~315447678985C8C77A568A09222109C4B0F63119 97968~|~1~|~1~|~01/ERD/MCEO~|~Muskingum County Engineer's Pavement Project - 4R47 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing of CR 723 (North Pointe Road) 02.53 to 08.42~|~05 - 4R Maintenance - Resurfacing~|~EE4AF6F4F6BF966AF0B39AB0F6576072A23D4E07 123644~|~1~|~1~|~01/NFP~|~Plan spit for crack sealing various routes on District 12, preventative maintenance.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C61138A695534D996F7F20A1E286980195928287 115385~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip-seal treatment. ~|~05 - 4R Maintenance - Resurfacing~|~FB75DFF7948F3AC4B2AC2804A994B9FBA58BE83A 115385~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip-seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~4252BEF2238A9D7BB7754125E32E729C6C6C2BE0 125914~|~1~|~1~|~01/NHS~|~Superstructure replacement~|~13 - Bridge Rehabilitation~|~9EB5FE6FC6CF177EDDBCB93FB2256E2F15E5C336 114553~|~1~|~1~|~01/S<2~|~Minor widening of the inner portion of the roundabout with drainage modifications to allow access for very large trucks.~|~21 - Safety~|~8D9B497AF53B128B506C3F7C36FB9D40371177C6 119671~|~1~|~1~|~01/NFA~|~Replace bridge carrying SR 646 over unnamed tributary to Irish Creek.~|~04 - Reconstruction - No Added Capacity~|~E1923F69794880C0E0CCECA9190ECB64C9AA2700 105380~|~1~|~1~|~01/STR~|~AC Overlay with repairs on rural route: MER SR 707 SLM 13.09 to 16.11~|~05 - 4R Maintenance - Resurfacing~|~CFEA6E52F1A8A2AE193C89885DE5B0BBFE7842F9 114787~|~1~|~1~|~01/IMS~|~Seal mainline bridges on I-71 and I-75 in Warren County~|~47 - Bridge Preventive Maintenance~|~89BBE1512A929C73C1F0637984590F7EDBD57295 86695~|~1~|~1~|~01/MPO~|~SR93 0.00 New Ironton Russel Bridge (SFN 4401263), construct an Inspection Travler under structure. Project Description: It is proposed to make an inspection traveler under the new Ironton/Russell Bridge (SFN 4401263) with a generator and air compressor on the reaveler. This is not a bridge cost.01/MPO/BR/State~|~13 - Bridge Rehabilitation~|~9B3F5B2A27DDE873BD771CEEA8A12307018A1DD8 122016~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County.~|~44 - Other~|~8D377CE3851CDD2631F24D80B4194AB2027C8E29 105929~|~1~|~1~|~01/MPO~|~Resurfacing work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~E5512CBDDD1111D780D33203F2BE4FA98F9E5A09 113507~|~1~|~3~|~03/NFP~|~Paving parking areas outside of travel lanes at roundabout - 100% local cost~|~05 - 4R Maintenance - Resurfacing~|~BCDFA243F9CFCE3FACD40D12F8C6B478976C1062 113507~|~1~|~1~|~01/NHS~|~1-3/4" mill and fill with asphalt concrete in the City of Greenville:~|~05 - 4R Maintenance - Resurfacing~|~F04B8B26BFA187072F99AD995018401B8412DEA0 113507~|~1~|~2~|~02/S<2~|~1-3/4" mill and fill with asphalt concrete in the City of Greenville:~|~05 - 4R Maintenance - Resurfacing~|~39D12DEC8E6C7CB7A671D0C98FBBEAF0E264BA5D 82288~|~1~|~1~|~01/IMS~|~Add fourth lane and auxiliary lane on I75 between Shepherd and Glendale Milford. Upgrade interchanges of Shepherd and Glendale Milford.~|~03 - Reconstruction - Added Capacity~|~9728CE5D02D0DA412F7278DD4359FCD4638479F0 82288~|~1~|~2~|~02/IMS~|~Rehabilitation of pavement as part of the widening of I75 from Shepherd to Glendale Milford Road, for an additional lane in each direction with auxiliary lanes.~|~04 - Reconstruction - No Added Capacity~|~C66D850E433A0EB630869C4B42963644E5230FD4 82288~|~1~|~3~|~03/IMS~|~This plant split is to relocate Lockland Water Works in Evendale.~|~43 - Utilities~|~16EEF0BCDD4DF38C392BE6708A4AC1FC965A58A6 82288~|~1~|~4~|~04/IMS~|~Aesthetics paid by the Local - Village of Evendale.~|~44 - Other~|~7C2CBF8F745F00383FA2F2F97A28F6160EFD20D4 117378~|~1~|~1~|~01/MPO/SEBR~|~Resurfacing.~|~~|~2BF15A33E9CABBB0E70F9AD1297A8014567D9226 123132~|~1~|~1~|~01/IMS~|~Landscape Maintenance along Interstate~|~31 - Landscaping & Other Scenic Beautification~|~0FACCDD6CA73497F193A73FF173F278EBE721E69 95008~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split.~|~44 - Other~|~4455C9EE7B0B466251B85D2CA3FA12C80CFBD35E 118733~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 82 3.51. Funded 100% Federal.~|~10 - Bridge Replacement~|~E62B4E46043A96BA76AA838F78967F5B2695ABD3 101537~|~1~|~1~|~01/S<2~|~Smoothseal (Urbanized Area) Galion~|~05 - 4R Maintenance - Resurfacing~|~81593C87936DAB96557DA0C18D9A3703197FCEB8 101537~|~1~|~2~|~02/STR~|~Smoothseal (Rural)~|~05 - 4R Maintenance - Resurfacing~|~C16FE39FF45946839EEE61BD703E8F2356045CBC 102326~|~1~|~2~|~02/STR~|~Resurfacing and widening of pavement and shoulders and improve intersection geometry on various county roads in Mercer County.~|~05 - 4R Maintenance - Resurfacing~|~FBCEA848FD570B89C0C4A971D200A44C42F42DA6 102326~|~1~|~1~|~01/S<2~|~Resurfacing and widening of pavement and shoulders and improve intersection geometry on various county roads in Mercer County.~|~05 - 4R Maintenance - Resurfacing~|~C2C47DCDA409E466E0A1D9A22FEFF18226B4377A 102326~|~1~|~3~|~03/NFA~|~Resurfacing and widening of pavement and shoulders and improve intersection geometry on various county roads in Mercer County.~|~05 - 4R Maintenance - Resurfacing~|~EFCD359C0DDFE600FCA90C8322D2EEB7EB076CAB 124686~|~1~|~1~|~01/IMS~|~Plan split for removal of a pedestrian bridge that is no longer needed. ~|~13 - Bridge Rehabilitation~|~DCACBA731408DE34E432BDC9C4B7F9D7E730DEB7 120453~|~1~|~1~|~01/IMS~|~Culvert rehab~|~04 - Reconstruction - No Added Capacity~|~BA3D71F14F768969F35A9A99BBE5FF921F89147A 115814~|~1~|~1~|~01/STR~|~Resurfacing in Pike County.~|~05 - 4R Maintenance - Resurfacing~|~8B83826D4EDBCCE27ADFA6DA9F7F350F86889C0A 112609~|~1~|~1~|~01/MPO~|~Split for MPO funded resurfacing work from City of Painesville Corp Line to just south of Washington Street.~|~05 - 4R Maintenance - Resurfacing~|~D484A312F751ACF4A2EE8D58E81C75847FDC1F75 112609~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible work from SR-84 to City of Painesville Corp Line & from City of Painesville Corp Line to just south of Washington Street at 100% City of Painesville funding.~|~05 - 4R Maintenance - Resurfacing~|~AE9AF3261214C43EE58135E579470B5D4B16B3FD 101830~|~1~|~1~|~01/NFP~|~Chip seal and asphalt resurfacing of various access and service roads.~|~05 - 4R Maintenance - Resurfacing~|~234FB242C1250D64D1A9BBAB947FB84BCAB86E18 76174~|~1~|~2~|~02/BRO~|~District Alloc. BR Elig funded bridge: 4802888 LUC IR75 1.39 Intersect: Sr 2-Nsrr & Emerald Ave4802977 LUC-75-1.674803574 LUC-75-4.904803396 LUC-75-4.614802764 LUC-75-0.27~|~13 - Bridge Rehabilitation~|~066ADDBBC65A5BF15D68BDA0C4FD63F1B4AFCCD8 76174~|~1~|~1~|~01/IMS~|~District Alloc. funded bridges (Bridge In-eligible)4802853 LUC IR75 1.3 Intersect: Segur Ave4802942 LUC IR75 1.67 4803639 LUC-75-5.04 L4803663 LUC-75-5.04 R4803728 LUC-75-5.20 L4806816 WOO-23-33.74~|~13 - Bridge Rehabilitation~|~6E59E4944B44FD5BC66183DA7074FCF582F88E4C 96471~|~1~|~1~|~01/BRF/PATA~|~Municipal Bridge Program - 4R87 (80% Federal) / 4BG7 (20% Local) - CAP (See Project CAP Comments) - City of Pataskala Bridge replacement of Lic TR 38 4.42 carrying Columbia Road over Muddy Fork~|~10 - Bridge Replacement~|~E83570CC3B6645B8DED04042228C9E9B00635F16 122163~|~1~|~1~|~01/S>2/PICK~|~SRTS - Design and construction of sidewalks in the City of Pickerington / Fairfield County.~|~28 - Facilities for Pedestrians & Bicycles~|~304DD4ACABD7346013D2EB368CE4DE3F96D5854F 119459~|~1~|~1~|~01/ERD~|~Plan split for eligible resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~E79BD1EF6C35EA67C47C7021F8387283596A1E21 124913~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~0BB138649FCE6F151464D2FD378F2ACC8DEA34BE 88732~|~1~|~1~|~01/S<2~|~Crack Seal - MED-003-08.56 - 09.87 / LOR-057-06.43 - 07.98~|~44 - Other~|~2DE6A1DEFE3332D1F93E2B698D307C1BEE9C16B2 88732~|~1~|~2~|~02/STR~|~Crack Seal - MED-003-03.90 - 08.56 / LOR-057-0.00 - 06.43~|~44 - Other~|~98226897F1787CF8E740FAC533F21FD375AFAB2E 88732~|~1~|~3~|~03/NHS~|~Craj Seal - MED-224-00.00 - 06.41~|~44 - Other~|~A028E9F7D6A5484892698D2F43544F7E7659D354 90949~|~1~|~1~|~01/SAF~|~Work on Wayne Street. Federal safety funds and MPO-STP funds. The match and funds needed over the cap will be provided by the City of Lima. The safety funds are to be used before the MPO-STP funds. The MPO-STP funds can be used for the construction engineering subphase. The safety program funds cannot be used for the construction engineering subphase.~|~21 - Safety~|~5C7F3886A7424335FC986E1F0A81576AFD334DDB 90949~|~1~|~2~|~02/MPO~|~Work on High Street. MPO-STP funds. Funds needed over the cap will be provided by the City of Lima. The MPO-STP funds can be used for the Construction Contract and the Construction Engineering subphases.~|~21 - Safety~|~2F0159C98C8376445873890B2085BDDB8C420DA7 112148~|~1~|~1~|~01/BRF~|~OPPP Funded items plan split~|~13 - Bridge Rehabilitation~|~D152F52015C9C8C16334F67B4DCD38C44BF247C9 98323~|~1~|~1~|~01/STR~|~SCI 772 0.00 to 5.97PIK 772 0.00 to 2.04~|~05 - 4R Maintenance - Resurfacing~|~AA379E3DFA8BF9FBDF22BDDF20A0B9C7AF2823B2 116925~|~1~|~1~|~01/MPO/HUDS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FC61650BA5CE942899C1352A086E9062358D343E 123456~|~1~|~1~|~01/STR~|~Resurfacing SR 644~|~05 - 4R Maintenance - Resurfacing~|~793F459C4A40FA499D1C77EDE88D6EDDC1032BFC 120494~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing Municipal Bridge Federal Funds (4R87) at 100% up to Federal Maximum (CAP). ~|~10 - Bridge Replacement~|~558E78ECCCD8E55D987D1B8567CD4C1C46A80C9B 113107~|~1~|~4~|~04/S>2~|~Minor bridge rehab > 20' span.~|~47 - Bridge Preventive Maintenance~|~5770124261F57ABB53691E42A7C248088D00132F 113107~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F9CC3AA4241A3749D0B282767D735AC0466CFF06 113107~|~1~|~2~|~02/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~04AE63B50DF69E979C20FC1FBE866A99ABD02D10 113107~|~1~|~5~|~05/S>2~|~Minor bridge work 10' to 20' span and culvert work.~|~04 - Reconstruction - No Added Capacity~|~81E8D26C2F573B864DD88B523B00625DA3EA3D64 113107~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~22BA840CE3DED2FB2B9E94406E4A9F02D619D082 119022~|~1~|~1~|~01/NFP~|~All work is in this split. ~|~21 - Safety~|~4F67056DB3C56C5B67424848D1938AE1B30672C8 122170~|~1~|~1~|~01/SAF~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~2432D68D5010E8F624F2512656B69563705F0505 107872~|~1~|~1~|~01/NHS~|~Reconstruction of pavement. ~|~04 - Reconstruction - No Added Capacity~|~DC091186AEFB34D481F3FACF6FF69E253D10B852 102482~|~1~|~1~|~01/STR~|~Resurfacing of SR 183 from SR 800 to SR 542 and SR 542 in Magnolia.~|~05 - 4R Maintenance - Resurfacing~|~70DE0F67AE7DBED638D93B3DAB7C4A9C44ECF573 93247~|~1~|~1~|~01/MPO~|~Replacement of sidewalk and aprons. Treelawn area will be filled in with pavers to match previous pojects. Items will be added on the South side only. Decorative lights will be installed on both the North and South side of the street on West National Road from Long Street to Helke Road.~|~31 - Landscaping & Other Scenic Beautification~|~619D3772602D4C91AB72083D83D6C42CE06C7111 126658~|~1~|~1~|~01/CMQ/MASS~|~Install roundabouts.~|~16 - Right of Way~|~530167AD25F8FA7A3EEFD58785334E1F795A29E5 88992~|~1~|~1~|~01/NHS~|~reconstruction, widening, turnlanes on US 250 in Norwalk at Elm Street~|~04 - Reconstruction - No Added Capacity~|~466E24DBCC8BAD61D89425A24598A42A26627A4C 88992~|~2~|~2~|~02/NHS~|~Added plan split for 100% local items and alternate bid items~|~04 - Reconstruction - No Added Capacity~|~59EBA97A8497894E8704D05C22F1A7293FE2D558 120432~|~1~|~1~|~01/STR~|~Established Plan Split 01/STR/OT - 100% State~|~21 - Safety~|~E23D3572BF3554EB8886BB80F99CA21BA027A8F8 105612~|~1~|~1~|~01/IMS~|~FAY-71 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~C69231CACFCF0508E9268811E1415549BAB1A546 105612~|~1~|~2~|~02/NHS~|~FAY-62 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~C31799E3964A2CFCD12C73339833807E14594B5F 87328~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 26 2.19-11.79. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~FE19F4F3F99F66B614917A4F80FA0611EE1088E1 87328~|~1~|~2~|~02/S<2~|~Two-lane resurfacing with an asphalt overlay, includes repairs. WAS 26 1.78-1.79. Federal aid route Urban, Federal 80%, Local 20% funds.~|~05 - 4R Maintenance - Resurfacing~|~8ABE60D2AC1D93EDDB8D0AF231B92F1EACBFD84B 87328~|~1~|~3~|~03/S<2~|~Two-lane resurfacing with an asphalt overlay, includes repairs. WAS 26 1.79-2.19. Federal aid route Urban, Federal 80%, State 20% funds.~|~05 - 4R Maintenance - Resurfacing~|~0BE29F5D464DFAE3E6B5D8D8F90313E383B29C40 118780~|~1~|~1~|~01/STR~|~Slope repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~655F5E753D02697B03CCCDBEF8F8AAA4C6843B67 93993~|~1~|~1~|~01/BRF~|~Replace SFN 7032048 on CR 37 (Shauck Road) over the Cedar Fork, a branch of the Clear Fork - Mohican River~|~~|~5957F045F8232682A78AD65A056BA6DBC4EBB065 111326~|~1~|~1~|~01/MPO~|~Resurfacing of W Park Ave and E State St in the City of Niles.~|~05 - 4R Maintenance - Resurfacing~|~06F0C80D073B17A32A037F72A3BEFD705FB86BFB 121926~|~1~|~1~|~01/IMS~|~Plan split for roadway capacity improvements. Construction of a collector-distributor road that will separate traffic on EB I-275 from traffic traveling to the I-71 interchange.~|~03 - Reconstruction - Added Capacity~|~5A4CACD6B07C6D4962D1FD91DA5AA5B1296C0A32 121926~|~1~|~2~|~02/IMS~|~Plan split for bridge work.~|~10 - Bridge Replacement~|~0F64319DE05AD1B5A0F9FE3DC2C571D2C91A37BA 93828~|~1~|~1~|~01/NFP~|~Paving at fairgrounds with 4CP7 funds~|~05 - 4R Maintenance - Resurfacing~|~36D2BA0DD9C6D98B605BA18F5FBB737FA010ACA1 92613~|~2~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items~|~~|~0FC3776D0F31547CE0725B7766ECC9484EE36C2B 92613~|~1~|~1~|~01/MPO~|~Widening of Burbank Road in Wooster~|~~|~B92D98D6C7C7EE393B45D87189AE705A04D2AE91 103173~|~1~|~1~|~01/NHS~|~Replace conventional signalized intersection with a roundabout.~|~~|~BF16DC251CCB20439851A0667A4A321FF4C5EBEC 111271~|~1~|~1~|~01/NFA~|~ODNR Shawnee State Park.~|~05 - 4R Maintenance - Resurfacing~|~9F38EC806807E8A9500B4B1C754A7F75D41DF726 88970~|~1~|~1~|~01/NHS~|~PIK 32 3.04-9.92~|~05 - 4R Maintenance - Resurfacing~|~4BC92FAD16F6219DBA0842D8B155B0837F1BB787 88970~|~1~|~3~|~03/SAE~|~Recessed-Wet Reflective Pavement Markings.~|~21 - Safety~|~B38EBBFE04DEA21BDCBCD1CDB70D6B5A3B5626A7 88970~|~1~|~2~|~02/NHS~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~899E19E4F0A8692ACA5CCA0D8800930F6CE8A335 108254~|~1~|~1~|~01/CMQ~|~Realignment of Aicholtz Road from Eastgate Square Drive to connect with Glen Este Withamsville Road near Larma Lane. Construction of three roundabouts and cul-de-sac'ing of three local roads.~|~01 - New Construction~|~9332FAC6224C73EC19EE102535D8C0F8FC24DA6F 94558~|~1~|~1~|~01/BRO~|~Project will remove and replace the bridge deck, convert the abutment to semi-integral, pier patching and structural steep. Br. No. MOT 75-1582, SFN 5708796.~|~~|~6C215FF636A11BDA329E4BEFCBB10D38B3EBCFE0 95797~|~1~|~1~|~01/NFP~|~from SLM .9 to SLM 1.06 and 2.17 to 5.83~|~05 - 4R Maintenance - Resurfacing~|~7596FB595C3D488C01C460720822FC46C7F5CAA8 122868~|~1~|~1~|~01/IMS~|~Pavement reconstruction.~|~04 - Reconstruction - No Added Capacity~|~D486E6360537238453D08B94F07166CFBE04C307 123740~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal urban STP funds from SLM 28.30 to SLM 30.48.~|~05 - 4R Maintenance - Resurfacing~|~237169885DEE4268B568208A28BBF0615ABF8319 123740~|~1~|~2~|~02/STR~|~80/20 fed/state funding split for all work using federal urban STP funds from SLM 28.30 to SLM 30.48.~|~05 - 4R Maintenance - Resurfacing~|~337D13326E6A97C17E4062360764F804F890BC06 127046~|~1~|~1~|~01/SAF~|~Realign the Franklin Intermediate and Junior High School driveway to be directly across from Beam Dr (MR-85). Install new sidewalk and curb bump outs on 4th St (CR-22) to improve the safety of the pedestrian crossing at the realigned School driveway/Beam Dr (MR-85) intersection.~|~28 - Facilities for Pedestrians & Bicycles~|~EE4AA67CC3309504FC076C651C05E5631344EF61 94688~|~1~|~1~|~01/SAF~|~Install Roundabout at MED-094-11.91/Granger Road~|~21 - Safety~|~3D0809772E48C673620E960C77BBC0DC41FBB39E 112157~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in various locations in D10. Federal 80% and State 20%.~|~21 - Safety~|~26FD5F6180DE0210CB8A1BB3CACBF9404A48C124 96767~|~1~|~1~|~01/SAF~|~Provide crossing improvements including improved crosswalk striping, updated ADA compliant curb ramps and signing at Intersections along the West Street and Center Street corridors. Install Rectangular Rapid Flashing Beacons at the existing crosswalk at Marker Road and the school drive. (SR 121)~|~21 - Safety~|~671EE17A1A5BE05E1D3F8B53E2AD8C2E178D25EB 110450~|~1~|~1~|~01/S<2~|~Resurfacing SR 267~|~05 - 4R Maintenance - Resurfacing~|~F277A8F37E9B0A61B036228B727AD5D7908BC8DD 110450~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~3A4CD9DE9F192B6DD44A38CEC0A834613241B217 91455~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. HOC 56 9.44-13.60 and HOC 664 0.00-2.90. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~05BD0D47DC7D3E05B10B791CDB106F81AA74E12E 113621~|~1~|~1~|~01/S<2~|~Landslide repair funded by OH20-01 ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F8E00DDB5F2BE621174088DE5DF778677956545E 93785~|~1~|~1~|~01/STR~|~Replace SFN 3600696Located 1.99 miles east of SR135 on US50. 80/20 Split01/STP/BR/State~|~10 - Bridge Replacement~|~FF561D05D7423C0255F41EB4D2850C80FB33FC7E 101621~|~1~|~1~|~01/ENH~|~Work funded with federal funds through teh Transportation Alternatives Program. 95% federal funds using Toll Revenue Credit (TRC) with the 5% match provided by Wyandot County. Funds needed over the capped amount will be provided by Wyandot County.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~FBF5EF980D4517FA9A04F9B57391AEA081BBE57F 124163~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance items.~|~21 - Safety~|~F17B6135E4298201BFD7C624379A34A3798DFC71 119983~|~1~|~1~|~01/STR~|~Plan split for federally eligible costs associated with the design build team.~|~10 - Bridge Replacement~|~40959E6486F78A0911D276930105EF4D2E308010 119983~|~1~|~2~|~02/STR~|~Plan split for locally funded Construction Engineering~|~17 - Construction Engineering~|~0B193C546817F7C44654E06E8852C26EC87F3015 115324~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~44 - Other~|~1B8CFC510293D51D500D72BB559D4EFFBCC6A857 91573~|~1~|~1~|~01/STR~|~A FHWA Disaster OH11-02 flood project. DSR TUS-014: Encroachment slide with large amount of debris and shrubs - 100' wide.~|~04 - Reconstruction - No Added Capacity~|~AB494ED830FA819533BD51E6EC338BF6E160DE94 114750~|~1~|~1~|~01/NHS~|~SCI Smoothseal~|~05 - 4R Maintenance - Resurfacing~|~50EB157B91C221888769B802A51633F837BC69C0 117045~|~1~|~1~|~01/STR~|~RIC SR 0095 5.087 to 11.247 Full Depth Reclamation ~|~04 - Reconstruction - No Added Capacity~|~3A58E5D8CA89E30966F6746D61655EB1A09FF18D 117045~|~1~|~2~|~02/BRO~|~Bridge repair.~|~13 - Bridge Rehabilitation~|~9C3F4ED138CEC9F05DABE86151EAE16D8FFCB14E 91544~|~1~|~1~|~01/SAF~|~added left turn lanes WB and EB on 20 @ Lime City - WOO US20 4.71-5.11~|~21 - Safety~|~5981C74D0ACA62FAA7D4CB2A3BD1E908DD8794FF 98494~|~1~|~1~|~01/NHS/MASS~|~Resurfacing of STA SR 172 from 6.19 to 6.27 and 6.84 to 7.74 in the City of Massillon.~|~~|~B022D80964356957169EE47BB3E940A64D8FF0C1 98494~|~1~|~2~|~02/NHS~|~Minor Bridge work to SFN 7600682 STA-SR 172-6.27 over Wheeling & Lake Erie RR, SR 21 and Tuscarawas River, SFN 7600755 STA-SR 172-7.55 over the Tuscarawas River.~|~~|~EA5B457074A7B004B0D4EEE7816B593FE964AF85 124458~|~1~|~1~|~01/NFP~|~Created for TID Involvement. ~|~44 - Other~|~B359C59C1CC2466782D485DB1FE9C1844644B57F 96539~|~1~|~1~|~01/IMS~|~Generic Plan Split for interstate routes. Routes to be determined~|~99 - State Preventative Maintenance~|~6239893B0E6E564F4A0AF548D843ADA28CD5342F 119204~|~1~|~1~|~01/STR~|~All items of work associated with US62 and US22 in the STP Rural Area.~|~05 - 4R Maintenance - Resurfacing~|~40ACD853506F921E68941275D568D842477C812F 119204~|~1~|~2~|~02/S5K~|~All items of work assoicated with US62 and US22 within STP 5,000 to 49,999 Area.~|~05 - 4R Maintenance - Resurfacing~|~B2D5F7E5B588CB1E17B9F4A97876A4D0016968E4 119204~|~1~|~3~|~03/S5K/WCH~|~Urban Plan Split~|~05 - 4R Maintenance - Resurfacing~|~58A7F70F33CE072EDCE14D524D2CE471F92A48EB 119204~|~1~|~4~|~04/S5K/WCH~|~Work items to be paid 100% by City of Washington C.H.~|~05 - 4R Maintenance - Resurfacing~|~7707C9AF88E5103A82E290F2259C93CEC21CA4B0 113532~|~1~|~1~|~01/NFP~|~Created for TID involvement.~|~44 - Other~|~D508C981B7FC5A6853A548D9BBBF980B95899C6B 108939~|~1~|~1~|~01/NFA~|~Replace 200 foot long culvert~|~44 - Other~|~FF79A648BA97D2436A8989999038B265D32EED40 119753~|~1~|~1~|~01/SAF~|~Realignment of the intersection at Reading Rd (US42) & Summit Rd to remove slip lanes and shorten pedestrian crossings. Other associated work includes ADA curb ramps and a new traffic signal.~|~21 - Safety~|~C15956C8E014984967AA1233F0BE9654D15B676A 101983~|~1~|~1~|~01/NFP~|~Spot pavement repairs on various routes in Ashtabula, Mahoning, and Trumbull counties.~|~05 - 4R Maintenance - Resurfacing~|~FD136E951030EFEE227A5FDCCA70687913E8226E 101983~|~1~|~2~|~02/NFP~|~See attached structures.~|~13 - Bridge Rehabilitation~|~74CB5F6EB2E96A2C71131658447EB7B7F2179475 102489~|~1~|~1~|~01/IMS~|~Resurfacing of IR 70~|~05 - 4R Maintenance - Resurfacing~|~69F04066EB56B21FCF549286ACA2D37A78CF9DBB 102489~|~1~|~2~|~02/SAF~|~Wet Reflective Pavement Markings delta costs (Safety funds)~|~21 - Safety~|~E5863E81DD62FB86D1C098214ED890ABF223374A 102489~|~1~|~3~|~03/NFP~|~Retroactive fuel price adjustment~|~21 - Safety~|~935E191058F313EF6F6A8C233F1E681DF3247B51 124434~|~1~|~1~|~01/NHS~|~Realign the intersection of PIC US 23 and CR 16/TR 802~|~21 - Safety~|~55512B33DE13E1377E9875FFBD8055CF3E1B894F 96339~|~1~|~1~|~01/NFA~|~Construction of a new sidewalk on the east side of Wolfangel Road from Beechmont Avenue to State Road in Anderson Township.~|~28 - Facilities for Pedestrians & Bicycles~|~596C27FE10A5EA0795137862226F51B4B51F3531 121416~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SEN-18~|~05 - 4R Maintenance - Resurfacing~|~E6A8895E5D3B91EDE0915734B2CAB697930149E8 109163~|~1~|~1~|~01/S<2~|~ERI-113-5.85 Slope requires periodic regrading/ berming work and monitoring.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A2CE321C40F960CD736C57C07E022DF79AA8A546 120927~|~1~|~1~|~01/IMS~|~Highway Lighting.~|~21 - Safety~|~9C61E402C6F8334229AF24FA29BD8FAAA69D9C98 95768~|~1~|~1~|~01/MPO~|~Resurfacing of County Route 506 (Fifth Avenue) from the Madison Avenue Freeway to Gypsy Lane, in the City of Youngstown, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~AF0AE3AEDF87F0A98D3661E4D5FFDADEE63D70FA 87674~|~1~|~1~|~01/NHS~|~Culvert Replacement at ASD-250-19.16. Filling and plugging the existing 6'x3' culvert and constructing a new drainage channel.~|~44 - Other~|~1D44005A4C241CFBBD74D245C9C43988445EC2E4 112917~|~1~|~1~|~01/STR~|~ROS 772 6.31-10.30~|~05 - 4R Maintenance - Resurfacing~|~139D577D87E815C7FB5C4255AB9B0BB9D90D3102 112917~|~1~|~2~|~02/STR~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~2E6D25CAA8E6289AC995508D1EDE09F743B703D3 101054~|~1~|~2~|~02/S<2~|~Microsurface various routes within Logan County: LOG SR 117 SLM 0.00 to 1.54 = = LOG SR 117 SLM 1.54 to 2.01 = = LOG SR 366 SLM 6.03 to 7.24 = = LOG SR 368 SLM 0.00 to 2.59~|~05 - 4R Maintenance - Resurfacing~|~32ABAFB6A3B8374BFC5C2521B4A91AFC50C91A48 101054~|~1~|~1~|~01/STR~|~Microsurface various routeswithin Logan County: LOG SR 117 SLM 2.01 to 3.29 = = LOG SR 117 SLM 3.29 to 5.83 = = LOG SR 366 SLM 7.24 to 9.78~|~05 - 4R Maintenance - Resurfacing~|~E2C57264856C526B1BD24484DE7FAFBEBC63D018 102230~|~1~|~1~|~01/NFA~|~This plan split is for work in the Metro Park.~|~44 - Other~|~901BAE6A1DB47170129E71F9F57228676B01C54D 104154~|~1~|~1~|~01/S<2~|~LAW 7 3.89 Slide Repair.~|~04 - Reconstruction - No Added Capacity~|~9F8099515AC1B519ED004E23D1213E711C3F780C 112544~|~1~|~1~|~01/NHS~|~District wide bridge deck sealing project.~|~47 - Bridge Preventive Maintenance~|~6F20534123356A394808B2ACD2A1B2392EF54DF6 84881~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" - Farifield County Bridge replace on CR78 (Landis Rd) over Clear Creek. CAP CEAO funding cap of $968,810 at 95% using Credit Bridge with a CAP of $124,350~|~10 - Bridge Replacement~|~D6A2381D2291EAB8BB53C7D6A60A253C140EA03E 114705~|~1~|~1~|~01/NFP~|~Overlay on 123.~|~05 - 4R Maintenance - Resurfacing~|~C09CB2CFF57466BF5DD643EDC8E9B45A5F31E1F1 114705~|~1~|~2~|~02/STR~|~Overlay on 123~|~05 - 4R Maintenance - Resurfacing~|~C6CE80C783E76AED212E0E25CA8723A9D3FEC605 114705~|~1~|~3~|~03/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~206E6451E78B42CAE33FD9ED30BAD3D84A0FD860 94631~|~1~|~1~|~01/S<2~|~Districtwide maintenance throughout the District.~|~44 - Other~|~2953BE5F9CBB34B5C8B3CAF01A2D58901A2E9E8B 10374~|~1~|~1~|~01/STR~|~Brdg Replacement. Eligible for BR funds to rehab but not replace. 4401956 LAW SR93 21.32 Intersect: Olive Creek 80 Fed/20 State01/STR/BR/State~|~10 - Bridge Replacement~|~666AE7D119DCFE2A7CAC199384AE4EB4A61B7775 110039~|~1~|~1~|~01/NHS~|~Plan split for resurfacing outside of Fremont Corp. Limits (SLM 11.77 to 12.826)~|~05 - 4R Maintenance - Resurfacing~|~86C9A2FECF6872A9460B18BF897C9187F3E4B603 110039~|~1~|~3~|~03/NHS~|~Plan Split for 100% Locally funded scope items within Fremont corp limit, including full depth repairs, upgrading loop detectors to radar within City limits, and overlay or resurfacing of Rawson Ave past limits of SR-53.~|~05 - 4R Maintenance - Resurfacing~|~D32E77C19B34CCA11223E7821F4375B2715348AA 110039~|~1~|~2~|~02/NHS~|~Plan split for Urban paving section inside Fremont Corp. limit (SLM 10.45 to 11.77)~|~05 - 4R Maintenance - Resurfacing~|~B8D71B512BC94A1DCC5D957B745CE15D2DF91220 110052~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 56 10.08. 100% State ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B256DE13356EDFADB8541F0C1C9BCC7B6A62B133 99606~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A84A6F33655C045A2D556661943371D5EFFFC026 116564~|~1~|~1~|~01/STR~|~Plan Split for the bridge work~|~10 - Bridge Replacement~|~4198BB630F9A89EB6E2283B95629F45FC4B19B8F 85065~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~9B553CA37BDEC81D15926B937717AFDEF06940F9 86949~|~1~|~4~|~04/S>2~|~Resurfacing of State Route 289 from SLM 2.17 to SLM 3.71, in the City of Youngstown, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~1DF4493F8ACF31A40A6716C24DB6F3346323A916 86949~|~1~|~6~|~06/NHS/Ytwn~|~100% City of Youngstown items, including partial and full depth pavement repairs, adjusting manholes to grade.~|~05 - 4R Maintenance - Resurfacing~|~2A157613EB0E130CAA2F5B3AEF832BC2A956B9EC 86949~|~1~|~3~|~03/NHS~|~Bridge rehabilitation of SFN# 5005132, MAH-US422-1.86 under MAH-US422-1.90, in the City of Youngstown, Mahoning County, Ohio.~|~13 - Bridge Rehabilitation~|~594777581D16B18EDDD75B5143928B5735023653 86949~|~1~|~2~|~02/NHS~|~Resurfacing of US-422 from SLM 0.00 to SLM 1.90, in the City of Youngstown, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~C9D2DCC294BBD85B2F854167715C82052AF79D20 86949~|~1~|~5~|~05/BRO~|~Bridge rehabilitation of SFN# 5009472, MAH-US62-18.60 over SR7, in the City of Youngstown, Mahoning County, Ohio.~|~13 - Bridge Rehabilitation~|~CD17BB4E0EDBED2BFCEB11933E4955665358E0E9 86949~|~1~|~1~|~01/S>2~|~Bridge rehabilitation of SFN# 5004950, MAH-SR289-2.68 over Dry Run, in the City of Youngstown, Mahoning County, Ohio.~|~13 - Bridge Rehabilitation~|~FCB030532A906D3484EABF71405F06171ECF9EC2 111892~|~1~|~1~|~01/STR~|~Slide repair work on US 127. Funds by the Geologic Site Management Program with overage funded by the District.~|~~|~90C216F7567AFF8E5ADEC8EF56B5699FF5278C98 111892~|~1~|~2~|~02/NHS~|~Slide repair work on US 24. Funds by the Geologic Site Management Program with overage funded by the District.~|~~|~B194A8FC5F6432A09B85D9BA11FA738EFBBFF47F 105821~|~1~|~1~|~01/NHS~|~Plan split for culvert work on the NHS~|~04 - Reconstruction - No Added Capacity~|~53280935332833D6BA6807267AF298D3B0777247 126505~|~1~|~1~|~01/S50~|~Roadway & Intersection improvement~|~21 - Safety~|~A88D34B3B3585E2D04CD0E70694A6F56CA5E1788 126505~|~1~|~2~|~02/BRO~|~Replace structure~|~10 - Bridge Replacement~|~9E9F4C5BA149FE4C5D746A83A97BD311F57A4F33 98706~|~1~|~1~|~01/SAE~|~Various county roads~|~21 - Safety~|~15A6BBB1BD78B1887F66BC2890EABA032A55784E 112967~|~1~|~1~|~01/NFA~|~Replace bridge~|~10 - Bridge Replacement~|~C2E9707FA87944431C9463CA79B730E183DA6C26 124865~|~1~|~1~|~01/NHS~|~Traffic signal upgrades/repairs throughout the district.~|~21 - Safety~|~378030C3DAE6C3EA6B903321C42EC0F85B087588 95500~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~04 - Reconstruction - No Added Capacity~|~F7846A704D4583FA6491DD77B032B5D9E099738B 25161~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation Funding - No CAP's - Resurfacing - Lic-SR 16-14.10 to 19.68; Lic-SR 37-15.52 to 16.21 - Treatment = Milling off existing surface (1 1/2"-2"), 5 % repairs, resurfacing with 1 3/4" Item 442 Intermediate Course and 1 1/2" Item 442 Surface Course.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DBA2DA977285A5FE9487FB6D6AFEED445FD7DDD3 88519~|~1~|~2~|~02/STR~|~SEN -12-12.73 Bridge, SFN 7400330~|~13 - Bridge Rehabilitation~|~1C685E2F134C1C0F7450CC0A4B7188FF1E4F8038 88519~|~1~|~1~|~01/STR~|~SAN SR12 0.00 -3.92 SEN SR12 12.01-13.09~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C57F609F1D739F43B920D3CF55CCB66E0D2B6C97 110921~|~1~|~1~|~01/BRF/KCEO~|~Knox County CEAO Bridge Replacement Project (Bridge Formula Project) - 4B87 (Federal 100%) - See Cap Comments - Bridge Replacement on KNO-TR112-0.36~|~10 - Bridge Replacement~|~CBCBE55286C29BF6087C51C80AB894E63A7820D5 120760~|~1~|~1~|~01/S5K~|~Pavement rehabilitation along Fairfield Avenue utilizing Small City (4B97) Federal funds at 95% up to CAP.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~20CC9F096F9DAC9C0C49C178DB265527D753339F 112888~|~1~|~1~|~01/SAF~|~Safety intersection improvement project. WAS 60 20.40-20.48/Ferry Street includes a signal replacement/upgrade.WAS 60 20.22-20.30/Center Street includes a signal removal and ped improvements. WAS 60 20.13/McIntosh Street and WAS 60 19.94/Ullman will get ped improvements. Funded 90 Federal Safety/10% State Safety.~|~21 - Safety~|~20F5D94A58763227245C9AD5E176872695E0EFFB 112150~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - 100% State Funded (4PS7) - district wide mowing contract.~|~17 - Construction Engineering~|~3038A4ADBA514D848E3EE720E8202BD21476F276 98110~|~1~|~1~|~01/STR~|~Resurfacing TUS-258 from GUE Co. Line to SR 342, including asphalt concrete overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~1DC7E7645964959A9604290EA14B0E68FF2DCE80 89036~|~1~|~1~|~01/CMQ~|~local funds~|~24 - Traffic Management Engineering - HOV~|~B920FC909CD9E43DA758877F0A0632B027D48EA1 115125~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1CF8D69F8D01E5510237E11C75F5AC9A4116695B 115125~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68D8BA2FD224C1A47499F678298FF5EC09BE7F43 110600~|~1~|~2~|~02/IMS~|~Split for guardrail work~|~21 - Safety~|~4DCAA8819AC16F8BCA9AF64FA5EA691692989148 110600~|~1~|~1~|~01/NFP~|~Split for ding & dent work~|~21 - Safety~|~D586EA6CDE3D3E2CD173FFCD6A5BF2FA9786CD74 102278~|~1~|~1~|~01/SAE~|~Various county roads.~|~21 - Safety~|~18887F6FD26068EB64B397314B9F615FE27DDE9C 107553~|~1~|~1~|~01/NFP~|~District guardrail~|~21 - Safety~|~DDE95B82FABAE20A38EF8F2646A8E5D359BD63A8 98201~|~1~|~1~|~01/IMS~|~District Preservation Culvert Funding 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Culvert repairs along GUE IR 77; GUE IR 70; MUS IR 70; LIC IR 70;~|~04 - Reconstruction - No Added Capacity~|~84A1941865AEB94715E563281426144665473599 98201~|~1~|~2~|~02/STR~|~District Preservation Culvert Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Culvert replacement on: 1) MUS SR 93 2.90~|~04 - Reconstruction - No Added Capacity~|~23FA6A2C55DD667E630289E8A93FB094926C2900 113981~|~1~|~2~|~02/STR~|~Full depth replacement of pavement on: CLI-350 SLM 7.91 to 15.85~|~05 - 4R Maintenance - Resurfacing~|~D038019EE3D4413E33AEDBC74941C54742E8D974 113981~|~1~|~1~|~01/STR~|~Plan Split for the resurfacing work on western portion of CLI-350~|~05 - 4R Maintenance - Resurfacing~|~BEAD64CDFC0BBACE51A3CA5A636CA2D740F97DA2 95943~|~1~|~1~|~01/NFA~|~CNG Refuse Trucks~|~44 - Other~|~8A532DC99277050A38658EBD006D9EB4A56BCFC2 107121~|~1~|~1~|~01/STR~|~Resurface with fine graded polymer modified asphalt concrete on CLA SR 369 SLM 0.00 to 1.45.~|~05 - 4R Maintenance - Resurfacing~|~56C97E62EB6DE44EA886AF73E67A255B7BFA3E67 121723~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs WAY-226-7.751 to 9.306 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~7C53E19850E29DB8E6C25171E2F6365416EE5BB3 121723~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs WAY-226-0.905 to 7.751 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~4C8CFDF419ADCC8F66EF1C3D5BA05D915EADC259 121723~|~1~|~3~|~03/STR~|~Asphalt Concrete Overlay with Repairs WAY-226-1.814 to 2.972 - Local Funding~|~05 - 4R Maintenance - Resurfacing~|~4701FA4EEE1EBA152EBC9676D530C848E4C5814A 114532~|~1~|~1~|~01/MPO~|~Split for MPO funded eligible resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~5EE255F003190BAE409E7F4929E9004298AFFFBD 114532~|~1~|~2~|~02/MPO~|~Plan split for TLCI funded eligible items such as mini-roundabouts/crosswalks, pavements markings, delineators, crosswalks, RRFB, curbs and traffic calming measures.~|~21 - Safety~|~2C7E2F26D0366915A1A73DF6DACBD24B641E04B3 114532~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~8DE6F2D1FEE427312BB93DB02B6D54CB7627D697 97093~|~1~|~1~|~01/IMS~|~Emergency maintenance project to repair damaged median barrier wall on IR75 SLM 2.47 to 2.51.~|~21 - Safety~|~FCB1E553B203BD6F0365ABD03ADD9EBD7C79FFF1 107221~|~1~|~1~|~01/NFA~|~The City will construct a 1300 linear foot northbound left turn lane on SR 43~|~01 - New Construction~|~53081EA4921B0F6DD83D03207F7B8F347294B598 115914~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - 90% Federal (4PF7) and 10% State (4PS7) - rehabilitation of LIC IR 70 23.20 (SFN 4504178).~|~13 - Bridge Rehabilitation~|~73374582B4B6F67DFB21DC073CD43FC62E85FA3E 112570~|~1~|~1~|~01/NFP~|~Signing plans split~|~21 - Safety~|~122B77E7441BBE3D52E28DB0AC0249E0FE30249E 92273~|~1~|~1~|~01/SAE~|~Erect new guardrail and replace substandard guardrail on various county routes in Clinton County.~|~21 - Safety~|~A9EFF85DFC2EC8ECF2AF2C888B44CCA80A8DA0AD 98392~|~1~|~1~|~01/NHS~|~Resurfacing STA SR 44 from 14.67 to 16.46.~|~05 - 4R Maintenance - Resurfacing~|~0A161DA0816ADAEF2072C0BA2ED76EE8BB4F7435 98392~|~1~|~3~|~03/S<2~|~Resurfacing STA SR 173 4.43 to 4.60.~|~05 - 4R Maintenance - Resurfacing~|~D029E0E23A5D3488E537AC1D0897CAE2961110F0 98392~|~1~|~4~|~04/NHS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~829D09FA331113FF21F3AD50BA469DCAC958CE5D 98392~|~1~|~6~|~06/STR~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~E64943FCC20F4DD1495B80036055759A91A71679 98392~|~1~|~5~|~05/STR~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~2C0D28871C03F6D0BB9A5604FEC7CE24FB07B63D 98392~|~1~|~2~|~02/STR~|~Resurfacing STA SR 44 16.46 to 19.39 and STA SR 173 0.00 to 4.43.~|~05 - 4R Maintenance - Resurfacing~|~2818A9DFDB4A45702481B0B9961B69841E70AC36 98392~|~1~|~8~|~08/S>2/LOU2~|~100% City of Louisville items.~|~05 - 4R Maintenance - Resurfacing~|~02D4DCBF98D24D670792C0CE8258C2C8499F82BC 98392~|~1~|~7~|~07/S>2/LOU1~|~Resurfacing of STA SR153 from SLM 6.25 to SLM 7.47 in the City of Louisville, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~4A11AA86092FF7F13BF52C2C45241D0049F29B96 113211~|~1~|~1~|~01/S<2~|~LAW SR 7 2.17 Phase 2B~|~01 - New Construction~|~34F1AE75272135D433CAD6B8445F8488946B225E 113211~|~1~|~2~|~02/S<2~|~LAW SR 7 2.17 Phase 2B~|~01 - New Construction~|~D7443B4D4430738183C20A5AE5144DCE400433B9 118909~|~1~|~1~|~01/IMS~|~Resurfacing IR 70~|~05 - 4R Maintenance - Resurfacing~|~9CB83879D1D5FCF0941D3067A979C9A70C47588C 123922~|~1~|~1~|~01/NHS~|~Bridge repair NHS~|~47 - Bridge Preventive Maintenance~|~B2FF0C2FBA3C99F9476D640F4459C904C20F944E 123922~|~1~|~2~|~02/STR~|~Bridge repair STP Rural~|~47 - Bridge Preventive Maintenance~|~9138797E424C083376F5B102937E11AE01F3CB6D 97035~|~1~|~1~|~01/NFP~|~Guardrail at various locations in District 11.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~445883FA2F779052E1221C15341E93D0DFD37078 105296~|~1~|~1~|~01/STR~|~Guardrail replacement at various location within District 11~|~21 - Safety~|~F2418DDF92B74B61806A4DEF442E8413893D7958 105296~|~1~|~2~|~02/STR~|~Guardrail replacement in Belmont County municipalities.~|~21 - Safety~|~53D333271E4031EB6E766FB2571D126B590E3616 120396~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~F1F83A35BD1D91714A1AC2C13DD95FE724FD6C7D 95966~|~1~|~1~|~01/NFP~|~Look at hooking up to Sanitary- 2 to 3 miles- force main?~|~~|~C3DD670138036EC45FDD66522EAB11E209D4E0B9 90310~|~1~|~1~|~01/S>2/Barb~|~Safety and congestion upgrade. Widening SB SR-619 at ramp E/F. Intersection to provide SB left turn lane. Introduce a continuous RT lane on ramp D. Includes intersection improvement at Wooster Avenue/East Avenue and Kenmore Boulevard, in the City of Barberton, Summit County, Ohio.~|~~|~654D74BE51122861C8496205A261A429336C32A2 118786~|~1~|~1~|~01/IMS~|~Microsurfacing.~|~~|~0DB8BE6990CCF1B24F8847D9F2A68188AAA22743 116483~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~F32C9F05F3DCB3389868A282573EE951B447FCB9 116483~|~1~|~2~|~02/NFA~|~Culvert Replacement~|~44 - Other~|~14C3D7E866D60F7074386A36625B1CD069650B89 100551~|~1~|~1~|~01/NHS~|~LAW 52 Bench Cleaning~|~44 - Other~|~47920CEA2D98AA99A6C091572A226F5DACAD9095 121148~|~1~|~1~|~01/S>2/MACE~|~Deck overlay.~|~47 - Bridge Preventive Maintenance~|~61A0CCB4FFE7605FE10BFED7B6AEDC3E09DCA59C 95452~|~1~|~1~|~01/BRF~|~Local bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~D93D73AB94E135AF0C286DE9FA6DDEDEB288E35B 110446~|~1~|~1~|~01/SAF~|~All work on SR 315, Abbotsford Green Dr., Briarcliffe Dr. and Jewett Rd including drainage work.~|~21 - Safety~|~F8E6A31D9E460555EC1595958A01F04D8235E8C8 110446~|~2~|~2~|~02/SAF~|~DEL 750 from 6.651 to 6.779 and DEL14 from 0.00 to 0.038~|~21 - Safety~|~FDB4233627A7197634BD0467C47F1EA8B3E91B23 103595~|~1~|~1~|~01/STR~|~Emergency project to repair a landslide. GAL CR 3 6.95 Bulaville Pike. DSR GAL-003.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B0F4DCDDEFE5F41B6B4260744A916A5A3E6CBA20 113057~|~1~|~1~|~01/NFP~|~All work is in this plan split using 100% state funds from SAC 4PS7, district preservation funds.~|~21 - Safety~|~E5894C9954A6A33F15B386070973E815DC3B1929 100786~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on rural route: MIS SR 202 SLM 0.86 to 5.06.~|~05 - 4R Maintenance - Resurfacing~|~64B0B3EAD6F94326B49A2CBDA04FF0404E5FDF52 100786~|~1~|~2~|~02/S>2~|~Fine graded polymer AC overlay on Lg. urban route: MIA SR 202 SLM 0.16 to 0.86. (Split corp with Huber Heights)~|~05 - 4R Maintenance - Resurfacing~|~DE6693DBCA582A90F503D4E4B1F609F15130D7C8 100786~|~1~|~3~|~03/S>2~|~Fine graded polymer AC overlay on urban route: MIA SR 202 0.16 to 0.44 in the City of Huber Heights.~|~05 - 4R Maintenance - Resurfacing~|~A0575B99E91C24FBF53E608286DDF8B2E4C27F25 121271~|~1~|~1~|~01/STR~|~All Work with be within this split~|~10 - Bridge Replacement~|~ADE7B73686572AC67F731D9507466F7D9DE1E391 123873~|~1~|~1~|~01/S>2~|~Roadway widening & pedestrian/bike improvements~|~21 - Safety~|~ADC18CAF40D386EDE2A2BC5FC85ACA00161409AD 110391~|~1~|~2~|~02/S>2~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~E73D4732C4ABC3F65F7B12FE3C93F9D6ACDFD15E 110391~|~1~|~1~|~01/STR~|~Microsurface existing pavement~|~05 - 4R Maintenance - Resurfacing~|~A154DD833174A8B5050D9C01BE0EAE3EF50CAD96 99962~|~1~|~1~|~01/NHS~|~Erosion of the embankment toe by the Ohio River has caused distress to guardrail and pavement shoulder on the south side of US 52 at Asbury Road. Project will install a soldier pile wall to re-establish the roadway should and protect from future distress.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EFE9F4A73D54E8846ED512AA5F5BE04325F0388D 87005~|~1~|~1~|~01/NHS~|~1/NHS/PV/ This split is for the roadway work along both I-75 and US 68. Work on the ramps is included in this split. Work to replace or reconstruct bridges will be in another split. A category of NHS instead of Interstate is being used for the I-75 work because capacity is being added. This split will cover all the roadway work on US 68 but only the add capacity roadway work on I-75.~|~03 - Reconstruction - Added Capacity~|~26DD3FC747D01E9C897BFB77F03D9576316459E6 87005~|~1~|~3~|~03/IMS~|~3/IMS/PV/ The split is for the roadway work along I-75 that is the non-added capacity portion of the Interstate work. Funding for this split will be 90% IM funds and 10% state funds.~|~04 - Reconstruction - No Added Capacity~|~916F1F63AD78FE6B317D43DDC8EC7AA930203041 87005~|~1~|~2~|~02/NHS~|~2/NHS/BR/ This split is for work to replace bridges. The work in this split is not eligible for BR funds.~|~10 - Bridge Replacement~|~AF2E3C9AA31EDD77341E24D9AC55A2243DE903C9 87005~|~1~|~4~|~04/NHS~|~This split is for work to construct new bridges where there are not currently bridges.~|~08 - Bridge - New Construction~|~87DEFF2AABD6614AC9ED4966FD8483BACBD1D33D 107746~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads.~|~21 - Safety~|~E5B003801F13CFAD2EE07FD1DF51D396BAF0A891 106824~|~1~|~1~|~01/NFP~|~Install approximately 30 CCTV cameras at various locations statewide (Locations to be determined)~|~44 - Other~|~E674EDAB460DCCD89BCFBC30F4867DF11B22C8AA 120279~|~1~|~1~|~01/S>2~|~Install sidewalks along Smith Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~A7130FDAF8101EFF85CAE5C27462753089BEE3A8 100797~|~1~|~1~|~01/IMS~|~Build temporary cross over~|~01 - New Construction~|~4BA86513F629159769CABE8959B2C93182320C56 101880~|~1~|~1~|~01/NFA~|~Guardrail replacement on various CR in Scioto County.~|~21 - Safety~|~4210A12A4DE57DA00B45650A0222C547053282F1 116803~|~1~|~1~|~01/S5K~|~This plan split is for the work to be perform on COL 14T (0.00-1.82) and COL 62 (13.01-14.12)~|~21 - Safety~|~3507B75752343B438251629C45705666607B0055 116803~|~1~|~3~|~03/STR~|~This plan split is for the work to be perform on MAH 14T (0.00-0.91)~|~21 - Safety~|~7719170F1119093DD4A58A124BA20DD975036E91 116803~|~1~|~2~|~02/NHS~|~This plan split is for the work to be perform on COL 30 (34.40-35.91), COL 39 (19.91-20.70) and JEF 7 (14.78-17.61).~|~21 - Safety~|~FFB2A7F493EF60771D36A0D7256EA0DAC0EB5334 106972~|~1~|~1~|~01/S<2/ZANE~|~"01/S<2/PV/ZANE" - Resurfacing project in the City of Zanesville on CR 2003 from 0.00 to 1.20 using 4TA7 funds~|~05 - 4R Maintenance - Resurfacing~|~63073C854374865DAE886932F5D58959413D4BF1 119250~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~D698F9DBE0EC1B6494AA481BEA1733FA1CEE0EE0 118855~|~1~|~1~|~01/STR~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~73E1B76F883F44CED560D79A41A8AC826FF5B363 113400~|~1~|~1~|~01/SAF~|~District Intersection Safety Improvement intersection improvement at SR 204 and Milnor Road.~|~21 - Safety~|~E131DB6C7B0BA44B5242C581B56918F6C2C1A70F 97447~|~1~|~1~|~01/SAF~|~Construction of a roundabout at CR 10 (Bogart Road) and TR110/CR 110 (Campbell Street) in Erie County.~|~21 - Safety~|~CD7025113A2A1954E3A6FE6322FA2C443690085D 97447~|~1~|~2~|~02/SAF~|~Construction of a roundabout at CT 10 (Bogart Road) and TR 110/CR 110 (Campbell Street) in Erie CCounty~|~21 - Safety~|~ACA8CD011D960EC7F3206386517BAADEAE16CBCD 94134~|~1~|~2~|~02/NHS~|~Resurfacing MAH US 224 from 19.90 to 25.33~|~05 - 4R Maintenance - Resurfacing~|~C9342053D1D9AEA8C5D85DFF66466919DD546459 94134~|~1~|~7~|~07/S>2~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~A43ADE23FCF63BAC25FAC9ED80B8EAFCBED42C7A 94134~|~1~|~9~|~09/STR~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~696F8575E55E377D0522379FFECEAA254206FD40 94134~|~1~|~1~|~01/IMS~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~9BEB5F0AF2CF2EE41A8B0A1B1D5A948BEB4612AC 94134~|~1~|~6~|~06/S>2/STRU~|~Resurfacing MAH SR 289 from 6.09 to 7.28 80/20 items in the City of Struthers.~|~05 - 4R Maintenance - Resurfacing~|~15723553F68FE5E55C3CA3738733CA06713E2AB9 94134~|~1~|~8~|~08/STR~|~Resurfacing MAH SR 626 from 0.00 to 1.05 and 1.47 to 2.26.~|~05 - 4R Maintenance - Resurfacing~|~42EA697878AD450631A266B7A9A5B0A0058E26F3 94134~|~1~|~3~|~03/NHS~|~Minor bridge rehab to linked structure>20' span.~|~13 - Bridge Rehabilitation~|~C96B7C178FFE1257C82FE07E9A1B0E92656F35DC 94134~|~1~|~4~|~04/NHS~|~See linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~EA2E36933E5C03EEF39CED4D5CCEC05734D13C9C 94134~|~1~|~5~|~05/S>2~|~Resurfacing MAH SR 626 from 2.26 to 3.24.~|~05 - 4R Maintenance - Resurfacing~|~3A5ACBCCCACBF5CFD7557CBF8D194CD1D514F17E 97244~|~1~|~1~|~01/STR~|~PIK SR 124 7.04~|~44 - Other~|~165AFFAEE7142A00D92E8E883C84AECAE8770E81 110531~|~1~|~1~|~01/STR~|~plan split for the resurfacing in the rural section:CLE-50: SLM 7.68-9.67~|~05 - 4R Maintenance - Resurfacing~|~2836E7C702DF2341DEB453A763EDED3102BB6DB0 110531~|~1~|~2~|~02/S>2~|~plan split for resurfacing in the large urban section:CLE-50: SLM 9.67-11.49~|~05 - 4R Maintenance - Resurfacing~|~EDEBE1F710F880511234B2AF9694CE49F8F895DF 119182~|~1~|~1~|~01/BRO~|~Plan split for bridge work~|~~|~CBAE3F038ABF66E2E10FFAADC11655BB91015EEE 125920~|~1~|~1~|~01/MPO/STOW~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6899F5144A69453485D2C4C1D5C770BC08EF12CC 97270~|~1~|~1~|~01/NFA~|~Resurfacing Clarence Darrow Parking Lot and service entrance.~|~44 - Other~|~6977174FB06B7DC66F90EF0D7A71EA4A57313FB0 107295~|~1~|~1~|~01/CMQ~|~Construction of a new segment of the Little Miami Scenic Trail from the existing trail along SR-32 north of Beechmont Avenue, under the existing interchange of SR-32 with Beechmont Avenue, and across the Little Miami River to connect with the Lunken Trail, using the existing Beechmont Avenue bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~0DBF3A0CC60BE4B273CE8B7C61DDA70B30380CAD 107295~|~2~|~2~|~02/NHS~|~Paint and replace the bearings on bridge HAM-32-1.44R bridge at the SR 32/125 interchange (Beechmont Ave / Batavia Rd.)~|~13 - Bridge Rehabilitation~|~7FB9A934A9C497972859FE42F1D22DE78512F2B9 107295~|~1~|~3~|~03/NFP~|~Plan split for GCWW improvements being constructed as part of this contract but at 100% GCWW cost.~|~43 - Utilities~|~9BB54D5930753682D14B0A8CFD1001EB53B6CD56 107295~|~1~|~4~|~04/NHS~|~This split covers work necessary for addressing flooding issues in the infield of the EB SR-125 ramp to SR-32. The work includes adding a treatment to an existing culvert and grading work.~|~13 - Bridge Rehabilitation~|~809CD1FC03F563C6701CDA914779724DC10CB6D8 107295~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~AEC244C9861FEF427CA77925873F5CA4BDAB6E91 124590~|~1~|~1~|~01/STR~|~Mine subsidence repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~01E1237BFD1D5D653DE13A58BB7315113B131588 97278~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2018~|~21 - Safety~|~C0B1342FC8CA578A06C9F0B06E79471C0F15CC44 122418~|~1~|~1~|~01/S>2~|~Plan split for work traffic signal repair, replacement and/or upgrade~|~21 - Safety~|~5977100EF2D39D01191FBF8163964B8AF0988123 90457~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay project on WAS 50 0404 (SFN 8401357), WAS 50 0489 L (SFN 8401381) & R (SFN 8401411). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~31A951D192F5E378AFDC6F5E213C426591061C58 90457~|~1~|~2~|~02/IMS~|~Concrete bridge deck overlay on NOB 77 0362 L (SFN 6100279). Interstate route funded 90 federal/10 state.~|~13 - Bridge Rehabilitation~|~4D273CFB91B1D3D4F74BBB65962DBA804B31BA9D 105806~|~1~|~1~|~01/MPO~|~STBG funded items~|~05 - 4R Maintenance - Resurfacing~|~7A2FAD7D8FBFC2AC2C282CD7A2B6E68FC5DF4C75 111949~|~1~|~1~|~01/S<2~|~2" Mill and Fill in the City of Urbana.~|~05 - 4R Maintenance - Resurfacing~|~785557F5F84061D5D81F3994072F0DF74EF00A6D 91678~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 143 8.20-8.25. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~ACE735DEA96A2694F4DD3693D3047D8241BF3460 91678~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 124 0.00-0.90, MEG 124 62.33-66.97, and MEG 143 0.00-8.20. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F2720D55270A5CEDAD66FB4CDCBBD4F118201B85 95581~|~1~|~1~|~01/STR~|~Bridge Replacement - WAY-094-16.74~|~10 - Bridge Replacement~|~00AE05C29C3C7EB56A907DAE391F27ECFABE5490 108257~|~1~|~1~|~01/STR~|~Landslide repair from OH18-01 ER Event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CBB553EB320BFE11A0C572B14DB8225CCFB2AE6A 87391~|~1~|~1~|~01/STR~|~ADA SR125 13.26 Slide Repair On SR125, 3.12 miles east of the West Union corp limit (13.26 to 13.36), it is proposed to rebuild & stablize an existing slope to stop vertical and horizontal movement.80 Fed/20 State 01/STR/OT/State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~072CB858483E51806A5E0FF2E667E74D551699DA 94078~|~1~|~1~|~01/IMS~|~100% state plan split for all work on this project.~|~44 - Other~|~03CF76439332086D5A7BA90D839D50323ED3263F 93543~|~1~|~1~|~01/SAF~|~Access management and signal installation from the Aldi's Drive (SLM 13.45 to Cazadores restaurant drive (SLM 13.69) on SR 47 in Sidney.~|~21 - Safety~|~9B37E588FD457F799492D177965BA06CA483B254 124644~|~1~|~1~|~01/SAE~|~Install new and upgrade existing guardrail on various Pickaway County roads.~|~21 - Safety~|~7FAF0A8228356203851B93A4A78EF6FECD4D0181 114637~|~1~|~1~|~01/STR~|~Overlay on SCI 776~|~05 - 4R Maintenance - Resurfacing~|~7F407A1F4C07692E8DD4A17ADA8FE66CF3E57D2B 95455~|~1~|~2~|~02/NFA/ODNR~|~Parks - ODNR Funding - 4BF7 (100% State) No CAP - Resurfacing work at the Hebron Fish Hatchery~|~17 - Construction Engineering~|~0D85B1155292923BFFAF02DEF92500696F30DEDE 95455~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 7BPB/4PS7(20% State) - See CAP Comments - Resurfacing on Lic-USR 40-19.59 to 30.14~|~05 - 4R Maintenance - Resurfacing~|~6D4D273A3152F6624C8B81A52121597A61FDD659 95455~|~1~|~3~|~03/STR~|~Distric Preservation 4PF7 (80% FEDERAL) / 4PS7 (20% STATE) - NO CAP - Sidewalk work in Brownsville~|~28 - Facilities for Pedestrians & Bicycles~|~761AFF980ACE8F10829B554997B9955629C09EB7 109444~|~1~|~1~|~01/NFA~|~Culvert repair project. WAS 260 4.46, 100% State funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB88B3B3B02913A0CB9A3E0E4B570B8F26DD8527 107427~|~1~|~1~|~01/STR~|~AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~0F09251E48A563E88A23F34CB207E5413B218889 118466~|~1~|~1~|~01/BRF~|~Replace SFN 4960122~|~10 - Bridge Replacement~|~A82396EB473D4D7D691422D5CF6215435F7C4DEE 77009~|~1~|~1~|~01/STR~|~The project has progressed to the design and construction phase of it's development. PE determined that a signal is warranted along with left turn lanes on each approach, however a roundabout alternative is being considered. The district has set aside a portion of it's system preservation funds (4PF7 & 4PS7) to construction this project.~|~21 - Safety~|~0568C1BA4CE7AC8FC4E960103C1DAF81FE3104F8 97043~|~1~|~1~|~01/S>2~|~STP > 200,000 Smoothseal: MED 162 SLM 15.27-16.62, 17.11-19.61~|~05 - 4R Maintenance - Resurfacing~|~F4CD86308BB0D41EC0895AF3C72A081CEDA521C2 97043~|~1~|~2~|~02/STR~|~STP Rural: MED 162 SLM 12.90-15.27, 19.61-24.08 (smoothseal), 24.16-26.74 (chip seal)~|~05 - 4R Maintenance - Resurfacing~|~FED01D66879B9FE6EE5C62B4D9DAD6C23CDFBA03 97043~|~1~|~3~|~03/STR~|~SR94 Approach using Verglimit Asphalt: MED-94-7.75 to 7.90~|~05 - 4R Maintenance - Resurfacing~|~AC42E18EF371E8B8F47F88F3C2DA74F420915041 103682~|~1~|~1~|~01/STR~|~Landslide repair on DSR ATH-007. ER funds are 80% and 20% local. ATH CR 20 5.27-5.29.~|~17 - Construction Engineering~|~8B028F4D69273CB8F4F1049646F17F13EDF56FFC 98299~|~1~|~1~|~01/MPO~|~MIll & fill Lake Ave from Griswold Rd to Elyria Ave.~|~~|~33C17374A0C116DF5B61A587BDC4156BC7EB7CCB 124074~|~1~|~1~|~01/STR~|~Superstructure Replacement (SFN: 8200505)~|~10 - Bridge Replacement~|~7506824256D9BB65603A1D042FD6F8011E61C293 101546~|~1~|~1~|~01/STR~|~Landslide repair, MOE 536 7.20. 100% Federal funded. DSR MOE-005.~|~~|~7B949778AD41137D5D4FDEA1A95E65E60F3BEDD2 77563~|~1~|~2~|~02/SAE~|~Replacement and upgrade of various signals on US-20 in Ashtabula Township, Ohio.~|~21 - Safety~|~BE5E15C42B70294839E864023D5A2E7629A6301D 77563~|~1~|~1~|~01/SAF~|~Widen for TWLTL from Ridgewood to Cook Road. ATB-US20, from SLM 14.28 to 14.68, in Ashtabula Township, Ohio.~|~21 - Safety~|~C3FF3F35F79DB2CA4FEBB365FE3C6721BDC17BD7 77563~|~1~|~3~|~03/S<2~|~Resurfacing and drainage improvements through section of ATB-US20, from SLM 13.78 to SLM 14.68, in Ashtabula Township, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~D733B84B9E5D9E4971CFECD02BD59B6864A73CA8 122719~|~1~|~1~|~01/S>2~|~Plan Split for MPO STBG funded scope.~|~04 - Reconstruction - No Added Capacity~|~8D2298BAEB2522AA125C26952AA0E5629FE09D62 122719~|~1~|~2~|~02/NFP~|~Funding split for 100% locally funded scope.~|~04 - Reconstruction - No Added Capacity~|~08E689DBE09EDADB3B8E23C7C48D934882B62CFA 109058~|~1~|~2~|~02/STR~|~Traffic signal replacement rural location (LOR-57)~|~21 - Safety~|~4803B8CA52F0A238816FD29813BDC222BFAD2047 109058~|~1~|~1~|~01/S50~|~Traffic Signal Replacement (RIC 42).~|~21 - Safety~|~6B871AD72284D921CCA331DCD6A9D16249D2D61D 109058~|~1~|~3~|~03/S5K~|~Traffic Signal Replacement (LOR SR 113).~|~21 - Safety~|~840741DC1EEA027B346D98110CB9037F1D5182EE 88326~|~1~|~1~|~01/CMQ~|~"01/CMQ/OT/BEL" - Intersection improvement at the intersection of Mall and Banfiled Roads; replace existing traffic signal, including loop detection, pedestrian pushbutton installation, signing and pavement markings.~|~21 - Safety~|~8382F18AD8A26DE3CF178CB098FDA4A4F716C4B3 107229~|~1~|~1~|~01/IMS~|~Guardrail upgrade work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~05B6972DC4D1D97EF93F48E85688F58B88DEF21E 107229~|~1~|~2~|~02/NFP~|~Split for guardrail repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~86B06A288B12C2E6CA4763354CCB806D03A03F48 126576~|~1~|~1~|~01/STR~|~Plan Split for Rural Major Collectors~|~05 - 4R Maintenance - Resurfacing~|~E1B473ACCE2F1120CB1EA3D588AB5B7EE72C50E9 126576~|~1~|~2~|~02/S5K~|~Plan Split for Urban Major Collectors~|~05 - 4R Maintenance - Resurfacing~|~9A4D1D6A7158717E28BA5992EDC4249F7309917B 126576~|~1~|~3~|~03/STR~|~Rural Minor Collectors~|~05 - 4R Maintenance - Resurfacing~|~A0BB3E26D7069DAA1ECEB34225E629D80E0F5A2D 126576~|~1~|~4~|~04/S5K~|~Urban Minor Collectors~|~05 - 4R Maintenance - Resurfacing~|~D11BC6C49C373B75286ED0E44FCA90F571F0E682 100817~|~1~|~1~|~01/NHS~|~Double Microsurfacing to TRU SR 45 from 9.87 to 10.66.Microsurfacing to TRU SR 45 from 9.17 to 9.87 and 11.65 to 12.90.~|~05 - 4R Maintenance - Resurfacing~|~DEE4C2F1146A60EA02C0701688962D92BBC29B4C 119146~|~1~|~1~|~01/NFP/Mans~|~Connection of existing Bike and Ped infrastructure~|~28 - Facilities for Pedestrians & Bicycles~|~27466ACA4A766F649C202973DE6DBCE77A82871E 84550~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. STP Rural, Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~38267D24460A92FE8FCF81ECDBE8539862159B65 84550~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using Oil & Shale funds on MOE 78 32.152-32.194. ~|~05 - 4R Maintenance - Resurfacing~|~36D1B3F72CF0F8A66187BA3F291BD9EFE3AD72EC 84550~|~1~|~3~|~03/NFP~|~Resurfacing of access road and parking areas at the Ohio River Lock and Dam 15.~|~05 - 4R Maintenance - Resurfacing~|~3918B5644DD9F4976CB88AD285ED44F6C6C4BFB9 97219~|~1~|~1~|~01/IMS~|~Plan split for all work on the interstate system.~|~44 - Other~|~869B2C78C8CCB6B87D63B34BB65D56347CAE8603 80964~|~1~|~1~|~01/ERD~|~All work eligible to be funded with this congressional earmark.~|~~|~3C7439E1E9605F341318CED4D79FB8B2E01C01E0 80964~|~1~|~2~|~02/CMQ~|~MPO CMAQ funding using an 80% federal / 20% local funding split.~|~~|~ADED3BC8FC0C40C61D3276B566497D0D01E4101A 99488~|~1~|~1~|~01/SAE~|~Guardrail replacement~|~21 - Safety~|~CFC633DCC5074512819A81CF55D803587FE78534 108036~|~1~|~1~|~01/STR~|~Bridge Rehab.~|~04 - Reconstruction - No Added Capacity~|~8504B938111354338EA36C9E6CCA05D96FAEE032 121609~|~1~|~1~|~01/BRF~|~Bridge rehab (deck replacement) major bridge funded FY2027~|~13 - Bridge Rehabilitation~|~C982A0E25B90944B96D0D0A21B0FF76EF9B169D6 121609~|~1~|~2~|~02/BRF/Nor~|~On-Going Services~|~13 - Bridge Rehabilitation~|~0DC7E526ECEF14285F51CCBB903B98FB22F1FF3F 96821~|~1~|~1~|~01/NHS~|~Priority System resurfacing of COL-11 from SLM 16.01 to SLM 22.69 including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~A66819A2CE5F4644FBE96AF95355647189A3D83A 115625~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~D8255395E4302B11E20355F725DCBFEE6D13D85D 96563~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay of SUM SR 303 from 5.49 to 8.94~|~05 - 4R Maintenance - Resurfacing~|~FA9B57BD38218377CDB459C0879F9952265D87B8 96563~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay of SUM SR 303 from 8.94 to 10.54~|~05 - 4R Maintenance - Resurfacing~|~766938CA03FD566068706FADB56D0CBE193C3F9D 96563~|~1~|~3~|~03/STR~|~Minor bridge work to SFN 7709935 SUM 303 7.22 over Cuyahoga River.~|~13 - Bridge Rehabilitation~|~2DFB201C84DEFF9C9B2FEDDC8874CADE70620386 114955~|~1~|~1~|~01/IMS~|~Place epoxy wearing surface on bridge deck.~|~47 - Bridge Preventive Maintenance~|~A7EAE357B8A751236F618B2801BB2E41DBA35E55 123160~|~1~|~1~|~01/NHS~|~Resurface with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~28D58E6BC5A016E00A93309DA05D01B162BEF471 124216~|~1~|~1~|~01/S>2~|~Resurfacing Non-NHS Portion, LOR SR 611 9.960 -11.183.~|~05 - 4R Maintenance - Resurfacing~|~0FEF2C98F4677662E8792E011CF37E2F1B40F2BB 124216~|~1~|~3~|~03/NFP~|~Pavement repairs and other 100% city items.~|~05 - 4R Maintenance - Resurfacing~|~C266B663933F1DDA5ED6B729210739A93A8156D7 124216~|~1~|~4~|~04/SAF~|~Guardrail items. ~|~21 - Safety~|~0CCD132DFA043B4B8B68B5D7BB45E65819464AA7 124216~|~1~|~2~|~02/NHS~|~Concrete patching, NHS Portion, LOR-SR-611 9.107 - 9.960~|~05 - 4R Maintenance - Resurfacing~|~B2FD8903DC6C3D022E34ADEBB31A4518201F4268 122314~|~1~|~1~|~01/SAE~|~Plan Split for cable barrier and end treatment upgrades~|~21 - Safety~|~3D7E93B270008D854BC856580FD3FECAC8A5B669 116844~|~1~|~1~|~01/ENH~|~Constructing new sidewalk.~|~~|~5A071D042A4E1A041146A9DB7AB0E74E732A2575 103973~|~1~|~1~|~01/SAE~|~Installation of pavement markings on various county roads in Preble County.~|~21 - Safety~|~40D0774B7AD8C8C64C5667B3E68BD381705C0C2E 110686~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~40F89D688C42980B32F8C72FD35B1BE3C441369B 110686~|~1~|~3~|~03/S50~|~Construction Inspection~|~17 - Construction Engineering~|~2BF4596299FAB8DAD259F3672BC7E2C2570C9DC5 110686~|~1~|~2~|~02/S50~|~Construction Inspection~|~17 - Construction Engineering~|~E9A865DE23C2123A121C5C2C1A80EB12F42B4EA7 84263~|~1~|~1~|~01/NFA~|~Replace superstructure and pier caps (COL-558-0512, SFN 1505610). Convert to semi-integral and rehab abutments and backwalls. The bridge will also be raised to meet current standards.~|~10 - Bridge Replacement~|~FED3F2805EB0F078787EBA4D95B4AF14F8533228 96097~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge replacement on 3005100 GUE-SR 285-4.37 Intersect: Over Tabitha Creek; Not BR Eligible: Length=17 SD/FO(0) SR=55.5 DSR=6~|~10 - Bridge Replacement~|~22471AC2DA23C50F579350953F5626B7A7C56832 104652~|~1~|~1~|~01/MPO~|~Resurfacing and installing landscaped median along Front St between Marshall St and South Ave.~|~~|~8D16426DD1C5914A2010B5A93ADCF12A83F66EF1 102975~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs on HUR-547-0.00 to 7.13~|~05 - 4R Maintenance - Resurfacing~|~EAD88BB6EDDCE22A9B98AA401D46E9F1B0DD1D46 101559~|~1~|~1~|~01/S>2~|~Repair significant drainage issue on the MAH-62-14.68 structure over Mill Creek in Youngstown. Includes slope repair and protection.~|~13 - Bridge Rehabilitation~|~F81419CEE7C494BDFF1C3CD0825708E71157D2BC 91779~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment with repair. MOE 536 2.49-12.63. Rural other federal aid funded 80% Federal and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~69FFB60CBD642F334E664615D9D4DB550D4A619F 91779~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment with repair. MOE 536 0.69-2.49. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B2C5DE0FB18E89CA70BEE1558181958C8F5E69E5 116329~|~1~|~1~|~01/NHS~|~Plan split for the NHS sections~|~05 - 4R Maintenance - Resurfacing~|~002E787F22BCC79D4195F20C2F85EA111BEA435F 82964~|~1~|~1~|~01/NHS~|~Plane and pave a portion of SR 126 in Hamilton County between US 27 and Galbraith: SLM 6.83 and SLM 11.35. This portion of SR 126 is a NHS route.~|~05 - 4R Maintenance - Resurfacing~|~1DD874D63BD3365238AA321A6ACA748E5291DF90 96976~|~1~|~2~|~02/STR~|~STA-SR 153-7.81 to 9.87 and STA-SR 173-1.85 to 4.26~|~44 - Other~|~6838C837033170BEB82E13049176C00931247B94 96976~|~1~|~1~|~01/NHS~|~STA US 62T from 0.02 to 4.67 and STA-SR 153-7.47 to 7.80~|~44 - Other~|~A9B93BE0D3066757B217AFA4E872BD3AA72CAA70 80620~|~1~|~1~|~01/ERD~|~Truck Route thru Orrville~|~~|~98C4598FD5ACD4CC75E16B0456C654F1CFA25535 113129~|~1~|~1~|~01/NHS~|~JAC 32 6.4-10.01~|~05 - 4R Maintenance - Resurfacing~|~DF41DD3CE8DEAC62F0FDF62A815C97586413D4B2 120458~|~1~|~1~|~01/IMS~|~Repair bridge by replacing the existing wearing surface with a new rigid overlay.~|~13 - Bridge Rehabilitation~|~5AAC821DCF83CCFAC99E553137B128DA04507EE4 86996~|~1~|~4~|~04/BRO/AT&T~|~Plan Split covering AT&T utility work.~|~43 - Utilities~|~424A4B2A28F651F9D94BCDB8A2C4E10EFDD503FF 86996~|~1~|~3~|~03/BRO/DEOG~|~Plan Split for DEOG utility work.~|~43 - Utilities~|~44C4C4A69B226B92BD4206862B450DDF871D2BBA 86996~|~1~|~2~|~02/BRO/AKRN~|~Plan Split for SFN 7760043 Brittian Road Bridge over W&LE RR~|~13 - Bridge Rehabilitation~|~4D655F0588D9CCCBD3EB0A42CAF5573404A91F2D 86996~|~1~|~1~|~01/NHS~|~Plan Split for SFN 7708165 SUM SR 18 13.02 under Brittian Rd~|~13 - Bridge Rehabilitation~|~C5575DD6558B19688D5FF201ABF844D85BD1D864 101908~|~1~|~1~|~01/NFA~|~Drainage improvements along North Main Street in Windham Ohio.~|~44 - Other~|~1F70693888733B8DF07CBBFAFFE1EF87A2992492 121099~|~1~|~1~|~01/IMS~|~Construction~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~01B65DB16721614F317C919AE24B1B8B49C20784 126028~|~1~|~1~|~01/NFA~|~MEG-CR 352-0.950 (SFN: 5338085)~|~13 - Bridge Rehabilitation~|~2654EA489085DF9DC796B33278AE2AABA6809755 126028~|~1~|~2~|~02/NFA~|~Created for ODOT TID Funds~|~~|~6F17F0891C8306D5245D229ABB6C894C45D68698 126634~|~1~|~1~|~01/S50~|~Rehabilitate and reconstruct the four-lane, John Scott Connector highway in the City of Steubenville.~|~04 - Reconstruction - No Added Capacity~|~FCF5E584822A22E442373F1C697AD2397B7E8D51 115601~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~C3B37BD7257081DA1603CCAE696CAF06C27421A2 106081~|~1~|~2~|~02/NHS~|~NHS Plan Split: FRA-161-7.11-7.35, 7.38-7.48, 7.52-7.62, 7.64-7.76, 7.92-8.67~|~05 - 4R Maintenance - Resurfacing~|~D857F7BE64D0D48CC1A6FCAA6112A1BAD3307710 106081~|~1~|~3~|~03/NHS~|~100% City of Columbus items for repair, curb work, etc.~|~05 - 4R Maintenance - Resurfacing~|~89808E55CCDFBC7195DEB8B9C31F7105C3674658 106081~|~1~|~1~|~01/NHS~|~Urban Paving Plan Split: FRA-161-5.77-7.11, 7.35-7.38, 7.48-7.52, 7.62-7.64, 7.76-7.92, 10.58-10.79~|~05 - 4R Maintenance - Resurfacing~|~7B7572EA83AB0E5E0437F914D43A762DBE5F7A3D 106081~|~1~|~4~|~04/NHS~|~Extra cost of special tack coat to be paid by the City of Columbus~|~05 - 4R Maintenance - Resurfacing~|~D8B9126C01B64400DC6E978F4057941478C17EC7 106081~|~1~|~5~|~05/NHS~|~City of Dublin Urban Paving Plan Split: FRA-161-4.75-5.77~|~05 - 4R Maintenance - Resurfacing~|~D30DD156F0FE1922291F4636FB0B512A53E4F211 106081~|~1~|~6~|~06/NHS~|~Items to be paid 100% by the City of Dublin~|~05 - 4R Maintenance - Resurfacing~|~E76CCE3C4738D964EB8913F960EF8D4119665533 95308~|~1~|~2~|~02/S<2~|~CR-41 from SLM 13.22 to 14.14~|~05 - 4R Maintenance - Resurfacing~|~324F65E03B507ABB6B2D3596E0337DC69E0189F0 95308~|~1~|~1~|~01/STR~|~CR-41 from SLM 0.00 to 13.22 (Rural)~|~05 - 4R Maintenance - Resurfacing~|~4D55F718B85A7A5E776D52BC32A6D9464252B430 99194~|~1~|~1~|~01/NFA~|~Pike County Various Routes Guardrail.~|~21 - Safety~|~45E4B7B53D539BD62C3E7CF2CB280303E5CF7791 99568~|~1~|~2~|~02/STR~|~This split is for the piece that is not on the NHS system.~|~05 - 4R Maintenance - Resurfacing~|~EA3C95A8DA952F73FDCCE62AB577643304174051 99568~|~1~|~1~|~01/NHS~|~This is for the NHS piece of SR-15~|~05 - 4R Maintenance - Resurfacing~|~FFBD063A2ECD5A18F819520E5CCEBBC5C6A801B6 94288~|~1~|~1~|~01/SAF~|~Project consists of widening Liberty Fairfield Road to provide a center turn lane from the southbound left turn lane at Millikin Road to Randall Drive~|~21 - Safety~|~AF98B09169F119297AD53042747641A6ED071A04 94288~|~1~|~2~|~02/SAF~|~Watermain upgrades being performed as part of the project, at 100% Butler County Water & Sewer cost.~|~43 - Utilities~|~D48C1BA70431D2F73AFBEE4E531B694B7DD49807 123624~|~1~|~1~|~01/STR~|~Plan Split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~C1E59298FF746661369F68849F1A2911D972D6EA 117403~|~1~|~1~|~01/STR~|~Plan split for Construction & CE~|~10 - Bridge Replacement~|~94EA21E9676C65073ED30E544C104BC6D642D154 123948~|~1~|~1~|~01/NHS~|~Resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~628F911FE92FBA56B48C6200D7A380FC9B8BDF33 106203~|~1~|~1~|~01/IMS~|~Lighting improvements to the following interchanges...MAH IR 680/SR 711, TRU SR 5/82/W Market St and TRU SR 82/E Market St.~|~21 - Safety~|~032008D7A13EB0221B98B5571E2CFA8FB18B2B5F 123093~|~1~|~1~|~01/BRO~|~Plan split to program project, update during scoping.~|~13 - Bridge Rehabilitation~|~F77B5DB23BABA076F8662E147758519E3F268A87 97085~|~1~|~1~|~01/S<2~|~4.69 - 5.24 Resurfacing Project~|~05 - 4R Maintenance - Resurfacing~|~3B8C7551FBF02D45DDBFF11FB7A83B8F06CCD69B 97085~|~1~|~2~|~02/STR~|~5.24 - 10.93 Resurfacing Project~|~05 - 4R Maintenance - Resurfacing~|~B49673AEB82B186FB08CE1EB9B0911C0A6505738 97085~|~1~|~3~|~03/STR~|~SR 159~|~47 - Bridge Preventive Maintenance~|~D25AEE6E4019034DE35EB94BE55E7E97B563AFBB 95673~|~1~|~1~|~01/CMQ~|~Intersection of Douglas and Dorr St~|~21 - Safety~|~B7EE591AFCC729A8A78F5229C3FCAC30D986797B 89125~|~1~|~1~|~01/SAF~|~Install new guardrail, upgrading existing guardrail and end treatments in various locations in Logan County. LOG CR 30 0.00 to 0.25.~|~21 - Safety~|~0370716F3A9038C9638880BA5982A1180BC2C89D 112984~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs using Indefinite Delivery Indefinite Quantity (IDIQ) construction project format.~|~47 - Bridge Preventive Maintenance~|~E0F7434365C8B6CB04D959EC87C10CD794739C46 115827~|~1~|~1~|~01/MPO~|~Safe Routes to School items.~|~28 - Facilities for Pedestrians & Bicycles~|~673F7FB9C91FF6183D3A14D18D6EFFB70F0FA812 98153~|~1~|~1~|~01/S<2~|~JAC 349 0.00 to 1.0980/20 local match~|~05 - 4R Maintenance - Resurfacing~|~468E780F8580FA82D5B07116A56E4D6A8135A388 98153~|~1~|~2~|~02/STR~|~JAC 327 11.62 - 21.24~|~05 - 4R Maintenance - Resurfacing~|~B12B9B696D3B8607A257C4E462392EF4795E4A9A 98153~|~1~|~3~|~03/S<2~|~JAC 349 0.49 4003837JAC 349 0.98 4003861~|~05 - 4R Maintenance - Resurfacing~|~87A6E2BAB566151B5625E149FC294060DEDD64CE 98153~|~1~|~4~|~04/STR~|~JAC 327 16.00 4003640JAC 327 17.49 4003675JAC 327 18.19 4003683~|~05 - 4R Maintenance - Resurfacing~|~B93151DDD7381F61ABCB571C02DB1B6C2B4FD4F6 102060~|~1~|~1~|~01/NHS~|~This is for NHS add turn lanes.~|~21 - Safety~|~B41D8FCA7795333F38D3E176089C71CA08B9CA18 86643~|~1~|~1~|~01/STR~|~Federal/State D6 funding for resurfacing outside of City and outside of urbanized area. SLM 0.00-1.34, 1.63-3.84~|~05 - 4R Maintenance - Resurfacing~|~406DC146B78D83990DBD2A69B8BE7C112D90F5EF 86643~|~1~|~2~|~02/S>2~|~Federal/State D6 funding for resurfacing outside of city but inside of Columbus urbanized area. SLM 3.84-5.63, 8.07-8.54~|~05 - 4R Maintenance - Resurfacing~|~425C9E6FB449F2E5DE1675DF1813082D38C5B912 86643~|~1~|~4~|~04/S>2/GROV~|~100% local Grove City funding for pavement repair within Grove City, SLM 5.63-8.07~|~05 - 4R Maintenance - Resurfacing~|~5F3109AC897CA361F28858D8A79EB7FEECBDF01D 86643~|~1~|~3~|~03/S>2~|~D6 federal/local funding for resurfacing inside Columbus urbanized area and inside Grove City. SLM 5.63-8.07~|~05 - 4R Maintenance - Resurfacing~|~D6A7AB9D21427D0037A344D5BCCB44128F9D76E8 125825~|~1~|~1~|~01/S>2~|~Plan Split for federally eligible bridge~|~10 - Bridge Replacement~|~0E20BCE5AC6F609DF046402B5FE6E5A16BEBA56B 93831~|~1~|~1~|~01/NFP~|~Asphalt repair/ Resurfacing and culvert replacement of Pater Lake Wildlife area in Butler County and also Rush Run Wildlife area in Preble County.~|~05 - 4R Maintenance - Resurfacing~|~440E92B2A2B4F90D8680F0A2CACE36ACFA81CEAF 109675~|~1~|~1~|~01/STR~|~Resurfacing BEL-9~|~05 - 4R Maintenance - Resurfacing~|~DEA88EBC736C08AA38465F6CD400D02AA3B2A6C1 112803~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-423-0.04-4.28 & MAR-231-0.02-1.07~|~05 - 4R Maintenance - Resurfacing~|~FEC0FA3B43AF8DBE380123EF717709A30DE6816F 112803~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: MAR-423-4.28-7.29~|~05 - 4R Maintenance - Resurfacing~|~85BAA77036929C46152D73DF9A4AFE769C86F22A 96336~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation Bridge Program 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge Rehabilitation BR Eligible: SFN 6006183 - MUS SR555 06.68 - L=113; SD/FO = (1); DSR = 7; SR = 49.6~|~13 - Bridge Rehabilitation~|~94D75E0C9199AE845ED7DDF6C080856E438C30DC 109364~|~1~|~1~|~01/SAF~|~Add left turn lane to the south bound traffic on SR 73 at the intersection of County Road 12 Antioch Road. Begin widening along East side of SR 73, 800 feet north of the intersection to provide width for turning lane and transition back to existing width 600 feet south of the intersection. All work done within existing Right-of-way~|~21 - Safety~|~16150843F7139B90BE2C7CE5C8E475C8DEBEED90 109364~|~1~|~2~|~02/STR~|~Split covers resurfacing of SR 73 from SLM 14.64 to SLM 14.91 using district preservation funding.~|~05 - 4R Maintenance - Resurfacing~|~1E68ED4F7096A21308D0C7458DFA6A889C461683 121038~|~1~|~1~|~01/BRF/HUR~|~Replacement of SFN 3948798~|~10 - Bridge Replacement~|~A818403A21B13F0E87DF3B56B8026F8D5899F346 125219~|~1~|~1~|~01/SAF~|~Raised pavement marker project on various routes throughout District Six~|~21 - Safety~|~ED534C79D593CB940C9F910914818F256542BFB1 101289~|~1~|~1~|~01/NHS~|~WOO-795 from SLM 2.129 to 2.297~|~05 - 4R Maintenance - Resurfacing~|~8147303C9B2A841D704B872A3E84065B8E46C2FB 101289~|~1~|~2~|~02/S>2~|~WOO-795 from SLM 0.75 to 2.129~|~05 - 4R Maintenance - Resurfacing~|~D0F86786EDC373D15C97F38844349EC89A6E2A09 101678~|~1~|~1~|~01/STR~|~MRW US 42 fine graded polymer AC overlay from 0.00 to 12.71~|~99 - State Preventative Maintenance~|~3A6453D9CFBE3D0F20B66C5C0595F09F51C0C940 101678~|~1~|~2~|~02/STR~|~Work on MRW-42-2.99 (SFN 5900492) and MRW-42-7.71 (SFN 5900530)~|~13 - Bridge Rehabilitation~|~6A4F638F87CB97C40758061F91CE1FA3B6F2A2A0 110448~|~1~|~1~|~01/SAF~|~Improvements at the intersection of MAR SR 423 and Barks Rd~|~21 - Safety~|~618D2C25F9B1D114F4631B737974B898815258D1 110448~|~1~|~2~|~02/S5K~|~City of Marion urban paving plan split for all items related to resurfacing for the roadway segment linked to this split.~|~05 - 4R Maintenance - Resurfacing~|~E8E986EA23B2CAACF4AFE0FDD6735604300275D5 113733~|~1~|~2~|~02/NFA/STRE~|~Culvert replacement, project eligible.~|~04 - Reconstruction - No Added Capacity~|~F5E343633295F109F1F8622D6BAD499BF6093D85 113733~|~1~|~1~|~01/SAF~|~Construction of a southbound climbing lane on POR SR 14 between Price Rd and Lake Rockwell Rd. Includes centerline rumble stripping for two lane portion.~|~21 - Safety~|~E12628087B317D85C2D899ED8718293EFB584BDD 125302~|~1~|~1~|~01/STR~|~Bridge replacement STP rural ~|~10 - Bridge Replacement~|~10E310BF4F115A684D75AD4B575102D55DD21D8E 119047~|~1~|~1~|~01/STR~|~Rural plan split for culvert rehab and storm sewer upgrades on MAR-746.~|~66 - Resilience Improvement - Highway Project ~|~EF5D59752BA8BDF8293DBC8990BDC4D690301845 88855~|~1~|~1~|~01/STR~|~District Allocation~|~10 - Bridge Replacement~|~AF078BF5BD65801EEDFCFEB400DD95E9D6BF5364 117348~|~1~|~1~|~01/BRF~|~Bridge Rehabilitation. All work in this plan split. ~|~13 - Bridge Rehabilitation~|~C7D543474706C656BFF70C38CBA8CB45CF239849 94373~|~1~|~1~|~01/ENH/MCMP~|~Enhancements to Slippery Rock Bridge in Mill Creek MetroPark, Mahoning County, Ohio.~|~31 - Landscaping & Other Scenic Beautification~|~1B8B00BA13FE1A775CCB04327AA7DA5C61719ECC 119177~|~1~|~1~|~01/SAF~|~Plan split for traffic signal work~|~21 - Safety~|~A48C76DF5874B8D5661483782062C0DFF3A8D9C9 97715~|~1~|~1~|~01/STR~|~Replace MAR-423-2.14 culvert over Myers Ditch~|~04 - Reconstruction - No Added Capacity~|~2EC70A4410CB513B7F4A941E51754FBA39BC4B07 107907~|~1~|~1~|~01/MPO~|~Roadway milling and resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~881D62F57A42608D6A87F3A408D71686B637ACC3 107907~|~1~|~2~|~02/S>2~|~Isolated repair of concrete curb, median and drive approaches.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~26ECC955418F3CB67119C47F6210A8037D3129B2 120533~|~1~|~1~|~01/S50~|~All work included in this split.~|~21 - Safety~|~4345C33CEC91FA34F58AB796680283C5A027F519 82786~|~1~|~1~|~01/IMS~|~test~|~13 - Bridge Rehabilitation~|~1DBEF5D647B67D487F953C0CDCC58FB5402F2C1D 90572~|~1~|~1~|~01/STR~|~100% State funds (4MP7) for district rpm replacement~|~21 - Safety~|~1D66AD0F60160375A8F36AE17AB62147976B7F3F 97109~|~1~|~1~|~01/BRF~|~The replacement of SFN# 3633683~|~10 - Bridge Replacement~|~9F1071CEE5E84D1D238D1F2CD00C16EE6F110729 91766~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 7 22.73-28.55. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E5120BE866BBEFECDC51E6F7BF21EF4132CEC82A 94418~|~1~|~1~|~01/NFA~|~Two Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8248751AC96DAFD5D6EA7FF0BAD6DF3A258FF888 112278~|~1~|~1~|~01/S<2~|~Bridge concrete overlay project. HOC CR 418 0.06, SFN 3703909.~|~13 - Bridge Rehabilitation~|~512FD31CB1F99BB7AF0051D52F9A8F22E0436607 107132~|~1~|~1~|~01/SAF~|~BRO 41 3.34-3.60 Safety Section Improvement.~|~21 - Safety~|~FFE2C79066936D7EB797D93E487ED0A2DB91F7C1 111168~|~1~|~1~|~01/NFA~|~ODNR Scioto State Forest.~|~04 - Reconstruction - No Added Capacity~|~02DAE0EAAAF963184347DA91646A211FAB7E1CC0 114634~|~1~|~1~|~01/STR~|~Overlay on SCI 335~|~05 - 4R Maintenance - Resurfacing~|~506014DA049E029B228135B8324F0B641FFC0240 117177~|~1~|~1~|~01/STR~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~905DA694E8DFE20DF6A294668A50E0ADC0BE3D08 99603~|~1~|~1~|~01/BRO~|~Rehabilitate bridge TUS 416 1483 (SFN 7906129) by replacing deck and converting to semi-integral abutments.~|~13 - Bridge Rehabilitation~|~9862A6916955F31D38E166D26D057C1FB2BD505C 122914~|~1~|~1~|~01/SAE~|~Convert existing signalized intersection of CR 16 (Havens Corners Rd) and CR 106 (Waggoner Road) to a roundabout.~|~21 - Safety~|~EA1649678BCC678C45328F11309770B7873D5255 108040~|~1~|~1~|~01/STR~|~Box Beam ReplacementMED-US-42 09.440 SFN 5201454 ) OVER CAMEL CREEK) New Construction ? Superstr repl (003) ~|~13 - Bridge Rehabilitation~|~66C8FB7B19AB90356852DC0532121ADDEAC5255D 104479~|~1~|~1~|~01/MPO~|~plan split~|~28 - Facilities for Pedestrians & Bicycles~|~ABF1E3E8EDAE51545BA9206BD1E37051F74F295B 123809~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~FCA84FA2CA6CC44FBC6B9B16177DCB2BE89BE174 123809~|~1~|~2~|~02/S5K~|~stp 5k-50k~|~05 - 4R Maintenance - Resurfacing~|~E2500A1D63C8DC15171BA66C4621DBCA1F50C87C 126724~|~1~|~1~|~01/STR~|~County Road Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~58F6B29ED4E41097BAD2E8CEE568CBE4BD5BEA42 97001~|~1~|~2~|~02/NFP~|~Construction of stone veneer on a large culvert headwall on HOC 374 0443 (SFN 3726134) that will be funded 100% by ODNR.~|~31 - Landscaping & Other Scenic Beautification~|~2101238005A47092CA844E6E50CE97D8E880092B 97001~|~1~|~1~|~01/ENH~|~Construction of stone veneer on large culvert headwalls on HOC 374 0443 (SFN 3703983 and SFN 3703975). Enhancement project funded 80 federal/20 state.~|~31 - Landscaping & Other Scenic Beautification~|~49BB34DF3AC157A85A42979623BA92F6FC95CC86 127116~|~1~|~1~|~01/NFA~|~Created plan split~|~28 - Facilities for Pedestrians & Bicycles~|~896EBBF91603C73DBAC2E955CECA0F8258698DAB 116448~|~1~|~1~|~01/NFP~|~Districtwide systematic lighting upgrades/maintenance.~|~21 - Safety~|~6850C00323E9537ECB0CDA3E2DB6850BC3CB2255 120723~|~1~|~1~|~01/MPO/OKI~|~Realignment of the intersection of Northland Blvd and Kemper Rd and the construction of a SUP along Kemper Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~9108BEF68BA0F8AAE37C7665FEE8339277C97299 109453~|~1~|~1~|~01/NHS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~8F5C1A60D15C9CAD27E92CF46CE5BA3764DDE7DC 114434~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~67CBD02608146D46B2C2C2AD14196D894DED8216 114725~|~1~|~1~|~01/SAF~|~District-wide fast drying pavement markers.~|~21 - Safety~|~24736B2D06B9939443EEFEEC41F1F8B8EE21B56F 109906~|~1~|~1~|~01/STR~|~Landslide repair project NOB 285 4.50-4.55. 80% Federal ER and 20% State ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F50B0568C9589E13D6610E9F43F6846547B10008 102834~|~1~|~1~|~01/STR~|~plan split for roadway work in the Rural sections~|~05 - 4R Maintenance - Resurfacing~|~D9F90E0E195598F0750688FBEA2B170B58C6FFB5 102834~|~1~|~2~|~02/STR~|~Funding event for the miscellaneous bridge work on the project. ~|~13 - Bridge Rehabilitation~|~E9075E2C5F464719C5211362B69966BCE1D1C4E5 98830~|~1~|~1~|~01/IMS~|~Split for interstate work~|~44 - Other~|~1277A538B4F1478BBA5CDF3376AA602079BAEBCD 116798~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~2E700381679A00D8C202B46702AD41AA5EB14FC9 82260~|~1~|~1~|~01/S<2~|~Sign Replacement~|~21 - Safety~|~F7902C18E0F4AF9F3441C76B1EC90CF2B880B68C 109707~|~1~|~1~|~01/STR~|~Chip seal ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0BDD478295DF1A42A0C9D906F27416A62CE0E653 95340~|~1~|~1~|~01/STR~|~Culvert ProjectO C 000 Other Federal-Aide Highway Major Collector RURAL ROS -SR -772 1.890 to 1.900 80/20 split ~|~44 - Other~|~E477A413D0F7C34092FE53642B0FE64BF787D890 119639~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~807CBAF43D6709D01E74DEF275B03BAB42EB52C6 117803~|~1~|~1~|~01/NFA/NALB~|~Plan Split 01/NFA/OT/NALB~|~03 - Reconstruction - Added Capacity~|~366B45ADC9408D25727F12FC49F999484866CCB6 99694~|~1~|~1~|~01/S>2~|~Resurfacing work funded with 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~774FD74FE8E91C2D0F54646563C860773A11F224 114710~|~1~|~1~|~01/IMS~|~Woo-75-13.28 bridge plan split~|~13 - Bridge Rehabilitation~|~8A891A12CA6C4DFCF264DB140B60ED603D2274D2 85107~|~1~|~1~|~01/STR~|~generaly system resurfacing w/ repairs; CAR/HAS -212~|~05 - 4R Maintenance - Resurfacing~|~AB49CF6F29DBDA695649C0746E24517F7BCA6597 104119~|~1~|~1~|~01/NHS~|~Bridge Replacement of SFN# 6700586, POR-SR14-6.24.~|~10 - Bridge Replacement~|~7E0ABE13C0E2DD3274C074D05A3EDC64620BA2BA 112729~|~1~|~1~|~01/NHS~|~PIC-361-1.12 - Convert to semi integral and paint steel~|~13 - Bridge Rehabilitation~|~12F4CE6E3BE640D12A8E22181A3DA85173F73E57 116295~|~1~|~1~|~01/STR~|~Overlay project.~|~05 - 4R Maintenance - Resurfacing~|~413D64DD2AFEA9332F460513CBEB911286EEC054 107249~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~63E36F330DB10AC1F1A7E955C94ACE316ECE2B9A 107249~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~A4A0B83E8CB3E7C3FB53F532DFD7968856D36530 107249~|~1~|~3~|~03/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~FC98140252773B17D0879D332043AF3C12EA3266 126752~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding.~|~~|~466E9CDFB6D7D585D110B4C07C37F897FFA86A93 108994~|~1~|~1~|~01/IMS~|~Replace flap gate along Ramp P1 in the FRA 270/23 South interchange~|~44 - Other~|~A187086D1CE4989D71795D11EB329CACC0E08ACC 105104~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~E84DACEF341552F1EED8583FDE9A98FF71CA05AD 118970~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding.~|~21 - Safety~|~1805308A7BC5A267D70A2648909ADDD6A7ABA26E 117003~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~50C3AE15B2B03CCE53689B3DB0733D06A9EB74B8 92873~|~1~|~1~|~01/S<2~|~Milling of existing roadway and resurface with asphalt concrete:MER-127 13.78 to 14.68~|~05 - 4R Maintenance - Resurfacing~|~12F86E78A5C3A18B831B9D54C9A7B97DE9C5DB7E 104135~|~1~|~1~|~01/NFP~|~Install CCTV at various interchanges throughout the state~|~44 - Other~|~9D1EE8F7BE6C15843565FD9971C504AF0A6030F2 93241~|~1~|~1~|~01/MPO~|~Landscaping and other aesthetic enhancements, continuing the concept plan that is already in place in the area. Byers Road from 1,200' North of Austin Boulevard to Old Byers Road.~|~~|~400E2F6430F8CDD1055B755BA7F0A063881E3C9A 111077~|~1~|~1~|~01/SAF~|~Improvements to the intersection of FRA-Reynoldsburg New Albany Rd at Havens Rd~|~21 - Safety~|~98468DEF98B51D1D87DB74510D6267AAB1E77B2D 93825~|~1~|~1~|~01/ENH~|~Provide improve pedestrian access along State Route 82, State Route 305, State Route 700 in Hiram Village by installing sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~27BD4A0204C7AA4CB9C213C340D5415738BA5318 113776~|~1~|~1~|~01/S>2/YOUN~|~Installing pedestrian lighting on the streets surrounding Taft Elementary School.~|~28 - Facilities for Pedestrians & Bicycles~|~1D7FD0E58AA58E8F66B8235A2824DA72D7BB59E0 112230~|~1~|~1~|~01/NFA~|~D09 Deck Sealing Project FY2026~|~47 - Bridge Preventive Maintenance~|~BE61874C43500625AFB7BF047D5684E0B2188B18 121429~|~1~|~1~|~01/IMS~|~Fending event for bridge work related to bridge WAR-75-0170~|~13 - Bridge Rehabilitation~|~84A7DDAFB6DEBE2E9E766FEF2EF7C932280691C0 113976~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 54.43 (SFN 5301807).~|~10 - Bridge Replacement~|~876BA21DAB6CE849CD814064C81EECC062B57F97 105276~|~1~|~1~|~01/STR~|~Resurfacing SR 152 from SR 213 to the Empire WCL (SLM 25.85)~|~05 - 4R Maintenance - Resurfacing~|~FE719C05C03442E96DFCED818244B9E77208A171 105276~|~1~|~2~|~02/S<2~|~Resurfacing SR 152 from the Empire WCL to SR 7~|~05 - 4R Maintenance - Resurfacing~|~BC98E64615EB802E91CDAA2F581F8B2E2330DCB9 90941~|~1~|~1~|~01/S<2~|~District Allocation - 80/20~|~10 - Bridge Replacement~|~67B8DD0334449328EDCF87A1580F71E9BC43DDD6 90941~|~1~|~3~|~03/S<2~|~Dominion East Ohio~|~10 - Bridge Replacement~|~DA0FF044A533B0C4BC8EC536568BDCB6C901E937 90941~|~1~|~2~|~02/S<2~|~THIS WORK WILL BE FULLY REIMBURSED BY CENTURYLINK~|~10 - Bridge Replacement~|~4D674F473FAEB0C16B9AC4F4217B0C44F8112600 123806~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~E64D47F8ED50E4F6C62F83231ABD386B14273E58 100290~|~1~|~1~|~01/IMS~|~Resurfacing and widening of Southbound and Northbound IR-77 ramps at SR-687, includes construction of a median wall and work to ramps H,N,O,P.~|~21 - Safety~|~F4CE633EC23D5F5FF060F126693021F915980AFB 100290~|~1~|~2~|~02/S>2~|~Resurfacing of State Route 687 from SLM 5.27 to SLM 5.53.~|~05 - 4R Maintenance - Resurfacing~|~7D9A9C693A733CB3851EA227CFCFFC8943541584 100960~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay to TRU SR 193 from 12.31 to 14.91 and 17.78 to 22.85.~|~~|~57A93144CEB04A58314C1C8A47B34EFD4F3B5112 112678~|~1~|~1~|~01/S<2~|~Resurfacing SR 43 within the City of Steubenville.~|~05 - 4R Maintenance - Resurfacing~|~C6DC01C4771A250269ABD62CF495958ABACAFBE1 112678~|~1~|~2~|~02/S<2~|~100% City items of work~|~05 - 4R Maintenance - Resurfacing~|~7DA23FEAF1224538DDD44CA91DBE66DCE6D0130D 92554~|~1~|~1~|~01/SAF~|~Reconfigure lanes on Inidan Ripple Road as they approach the ramps for IR675. Improve signal timing and phasing at the ramps.~|~21 - Safety~|~BD48DF7E1472AD86B4C3F525A3F6B4BF07D7B68F 92554~|~1~|~2~|~02/NHS~|~Removal and replacement of traffic signal controller units at 4 intersections along Indian Ripple Road, outside the scope of the originally approved safety funds. Improvements to be paid by City.~|~21 - Safety~|~DCB2371326830B837ED771D212837B4949BEA009 89456~|~1~|~1~|~01/BRO~|~Rehabilitation of Bridge SFN 7760329 Thornton Street Bridge over Railroads.~|~13 - Bridge Rehabilitation~|~C5A3EF94250D337BF8B4EE1E23A5FDCF1F6B3D45 100485~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using a microsurfacing treatment on WAS 7 14.05-17.60. Work also includes a double microsurfacing on WAS 618 1.48-1.86. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~1226BCFE5B794271E5A6B4FFA7C886694B416B2E 100485~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a double microsurfacing treatment on WAS 618 1.86-3.22. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~4BCF450E514A188B1078DF0EE5DE5AE5F25A252F 111558~|~1~|~1~|~01/BRF~|~Muni-Bridge funded items~|~10 - Bridge Replacement~|~875E23464E2D6E5627837742DE39EEED75F6778D 88306~|~1~|~1~|~01/NHS~|~District Preservation (80% federal) / 4PS7 (20% state) - No cap - bridge number ALL-65-0660, SFN 0201340.~|~13 - Bridge Rehabilitation~|~366D87FA3183050CC3227A73F9AFD3B0175217AB 88306~|~1~|~2~|~02/BRO/LIMA~|~Work on the City of Lima Bridge on Pine Street. Funds from the Municipal Bridge Program. ODOT is utilizing Toll Credit (TRC) to provide 95% of the eligible costs up to the cap in federal funds. The 5% non-federal match and any funds needed after the cap is reached will be provided by the City of Lima.~|~13 - Bridge Rehabilitation~|~901168DDD6928C6845284F717B641063A6C2B26B 89723~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for items of work eligible for multiple federa fund sources: 1) federal discretionary funding and 2) MPO enhancement funding.~|~28 - Facilities for Pedestrians & Bicycles~|~A727CA8282C3E627BC0810C8FAF5238ACC08D859 89723~|~1~|~2~|~02/ENH~|~100% local funding for non-fed eligible work.~|~~|~D59684EADD1E2CB873041F765EB2E4EC0440B8E6 117892~|~1~|~1~|~01/NHS~|~Plan Split for lane reduction and shared-use path/sidewalk on NHS and NOACA funding.~|~28 - Facilities for Pedestrians & Bicycles~|~BAFF6215D95CB3B3A342AAC55618BA0E6089EA10 117892~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost~|~43 - Utilities~|~172CDAE637EDA060920580AEE36268425C21C370 111639~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 1.00. GSM funded. Rural other federal aid funded 80 Federal/20 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F2673714879BC1AA4824522FCDD30636C5E04CC 103100~|~1~|~1~|~01/S>2~|~Mill and resurfacing on County Route~|~05 - 4R Maintenance - Resurfacing~|~46A7B05BEF4EC73DE5B00BCD19977D044431733F 97386~|~1~|~1~|~01/NFA~|~This project is for construction inspection in FY14 and FY15.~|~17 - Construction Engineering~|~68F9A9EDADD9BC1F19927E1511C152D83F87BC03 102448~|~1~|~1~|~01/NHS~|~Bridge Overlay JAC 35 26.06 4000757JAC 35 26.10 4000781~|~04 - Reconstruction - No Added Capacity~|~33E42CB1971E089E9BFC1421B30AF9B3D8AD06D0 102044~|~1~|~1~|~01/NFA~|~The village of Fayette proposes to widen and rehabilitate 2,200 feet of County Road "S" to facilitate the growth of TRW Inc.~|~03 - Reconstruction - Added Capacity~|~241F195EE66A36512682C51A6FE166CC48381EE5 124602~|~1~|~1~|~01/S5K~|~CEAO HSIP Safety project to upgrade guardrail on various county roads.~|~21 - Safety~|~C7163EA59B954D1E03B1699626635C284CCA8D53 110164~|~1~|~1~|~01/ERD~|~Plan split 1 for original PID 110164 safety improvement work using federal discretionary 4D57 funds.~|~28 - Facilities for Pedestrians & Bicycles~|~0770D43E1FC3E3A218F4CA2D08DD0BCA3B3192B5 110164~|~1~|~4~|~04/STR~|~Split 4 for original PID 103884 for resurfacing SR-608 using federal and state system preservation funding.~|~05 - 4R Maintenance - Resurfacing~|~8DCA554A6107D0EB03E7AD6062039C54F6F5D811 110164~|~1~|~2~|~02/SAF~|~Plan split 2 for original PID 23733 for safety improvements using discretionary and safety funding.~|~21 - Safety~|~1AA8F6F1F30924515B4454E9CB4432397251314F 110164~|~1~|~3~|~03/SAF~|~Plan split 3 for original PID 103884 for safety improvements using a combination of safety and animal drawn vehicle funding.~|~21 - Safety~|~16768EBEB4406CFC337DF0DEBF5E3AD64058D7E2 110164~|~1~|~5~|~05/BRO~|~Split for bridge widening work~|~21 - Safety~|~46A5472447A6BB744AD043805E9BF264DFEFB937 110164~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~D9CEC726A9913F80575299EEC407DDD6896EE3C1 121535~|~1~|~2~|~02/STR~|~Bridge replacement.~|~04 - Reconstruction - No Added Capacity~|~AA4D941CA8676A83484EFBC2A4245678BDE834A0 121535~|~1~|~1~|~01/S5K~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~84F558BAB1502F5541E285F31E79C1297F63CD0E 109984~|~1~|~1~|~01/STR~|~Smoothseal HIG 134 0.00-5.25 and BRO 134 0.00-0.34~|~05 - 4R Maintenance - Resurfacing~|~F7B32881999C9A9BF7306751824D4F36D1391EB2 104854~|~1~|~1~|~01/STR~|~This split is for the rural portion of the route.~|~05 - 4R Maintenance - Resurfacing~|~68E56139D8F30F34963C22F059FE3F26E43C9F66 104854~|~1~|~2~|~02/NHS~|~This plan split is for the NHS portion of this route.~|~05 - 4R Maintenance - Resurfacing~|~4501D621A5F24CA2462E54FB8E513C7D25D53EB8 93958~|~1~|~1~|~01/NHS~|~Urban Paving eligible items from SLM 15.76 to SLM 16.61~|~05 - 4R Maintenance - Resurfacing~|~2293C0E34B51170E34129C4D8AA1A54A34BE5B4D 93958~|~1~|~2~|~02/NFP~|~Non Urban Paving Eligible items from SLM 15.76 to SLM 16.61.~|~05 - 4R Maintenance - Resurfacing~|~841CF026216A9A652ECD646FB32D6C92166E325D 93958~|~2~|~3~|~03/ERD~|~Traffic median improvements~|~21 - Safety~|~194B6F3C607A0AC360B2AFE79D8952FD278F566C 75483~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds~|~05 - 4R Maintenance - Resurfacing~|~3A3B1BC4389C779DD83C8EF785C8FEACCE6D93B1 75483~|~1~|~2~|~02/IMS~|~Split for barrier repair work~|~04 - Reconstruction - No Added Capacity~|~13FCF2C7AA795229F94EBFE32D9E58B860D3DE8A 97371~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 821 0212, SFN 6105319. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~ECCD4E409E2ACFA94F8769AE23D81F2DB7678E32 127242~|~1~|~1~|~01/S>2~|~plan split creation.~|~05 - 4R Maintenance - Resurfacing~|~BD72486CF1819B1458826B8C07A0FAF1760941FB 127242~|~2~|~2~|~02/S>2~|~Local overage spilt.~|~05 - 4R Maintenance - Resurfacing~|~116E6BB2B23240E096EC0BFAE46CCE6B958D3EA0 127242~|~1~|~3~|~03/S>2~|~Created local CE plan split.~|~17 - Construction Engineering~|~F77B8C9E27DB8B101457B66C8CCAE66EC52F55ED 127242~|~2~|~4~|~04/S>2~|~Created Plan split 2 for local overages.~|~~|~CAF2F7CE35CE0DE7557CE4EB4920F6A85E2C21D8 110576~|~1~|~1~|~01/STR~|~To replace 42" culvert running down embankment between 2 bridges HAM-275-3500L (3113604) and HAM-275-3500R (3113612) underneath ODNR bike path and outlets Little Miami River.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~492DE8E4B728E8886879BF50FFAA9BF22AB281AA 89604~|~1~|~1~|~01/SAF/DEF~|~Work eligible for the funding approved from the ODOT Safety Program. The non-federal funds will be provided by the City of Defiance.~|~21 - Safety~|~29A73AEBD4C4A8E86BC65C32F840824A2B924B3C 89604~|~1~|~2~|~02/S<2/DEF~|~This is for Urban Paving costs. The 80% federal funds are from the District Preservation Program SAC 4PF7. The 20% match is provided by the City of Defiance SAC LNTP.~|~05 - 4R Maintenance - Resurfacing~|~A55B1251907BCD869181908F0420B13EA869CCC3 110737~|~1~|~1~|~01/SAE~|~Paving full Width~|~21 - Safety~|~5F0A3DC8815CC29AB0E10DE8FC5027D961AA9B12 117352~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~7E64FBF9D8F4BB619FA5CA1918A6E70E72BB2036 126066~|~1~|~1~|~01/NHS~|~NHS plan split. ~|~05 - 4R Maintenance - Resurfacing~|~9AB49EC4E563A7D8F1992F7815F872DFB89B0DE9 125787~|~1~|~1~|~01/STR~|~Asphalt Overlay GAL SR 850 & SR 553~|~05 - 4R Maintenance - Resurfacing~|~B2FD57E11F78B0B211EF23627DF29592E8F03140 108794~|~1~|~1~|~01/S>2~|~Local Let Urban Paving Plan split~|~05 - 4R Maintenance - Resurfacing~|~B9A645C5405E36CA9539C70E8563CE5F2D4C51BB 108794~|~1~|~2~|~02/S>2~|~Plan split for 100% City of Toledo items. Non-Urban paving items~|~05 - 4R Maintenance - Resurfacing~|~844EB96264DA9DA69845094E31B39BFC164A139A 115524~|~1~|~1~|~01/IMS~|~bridge split~|~13 - Bridge Rehabilitation~|~59355B6DEB0B25C1C15217D10089A448D224CD3B 82940~|~1~|~2~|~02/NHS~|~SFN 5000394 and SFN 5000424 SR 11 05.07 LR~|~13 - Bridge Rehabilitation~|~23DA35A6FF413951F470DDFB74232B659EFB6DC6 82940~|~1~|~1~|~01/BRO~|~ SFN 5000270 and SFN 5000300 SR 11 01.92 LR~|~13 - Bridge Rehabilitation~|~69017E80F8C290B8667FA4FC6C035519D729FFBA 113934~|~1~|~1~|~01/SAF~|~Pedestrian improvement on ATH 13 11.33-11.65. Work includes crosswalk markings, signs, LED enhanced signs, curb ramps and sidewalk.~|~21 - Safety~|~81BE2E3D9220056D9AC1BF23E52980D731C1F824 120246~|~1~|~1~|~01/SAF~|~SRTS Items~|~28 - Facilities for Pedestrians & Bicycles~|~BFC42E71B995F9B25592D79B99D5486F4A42945A 87534~|~1~|~1~|~01/IMS~|~Bridge rehab on Interstate 75. SFN 5502675 MIA 75 1290 R; SFN 5502829 MIA 75 1328 L; SFN 5502853 MIA 75 13.28 R; 5502640 MIA 75 1290 L;Bridge replacement of 2 structures on IR 75 SFN 5502799 and 5502764~|~13 - Bridge Rehabilitation~|~7E21DB9DDCA33A045BB2AE34011E2A460EC5B544 100850~|~1~|~1~|~01/STR~|~LAW 93 11.45-14.33~|~05 - 4R Maintenance - Resurfacing~|~92DB3FE9FE30A4E0166ED816C8FC367291E300BF 116482~|~1~|~1~|~01/NHS~|~Replace Culvert~|~~|~5A928F1885178D21C414351F9962BBC8FDCBBFCA 116482~|~1~|~2~|~02/STR~|~Culvert Replacement~|~~|~E0FAD8C3B322B5DCD18AE779DEC9E7DF474DFD69 116482~|~1~|~3~|~03/NFA~|~Culvert Replacement~|~~|~B3CE34547899F949FFF12B0BE190F08AC2CCB61E 116646~|~1~|~1~|~01/STR~|~Chip seal plan split~|~17 - Construction Engineering~|~51E9DD742C8ECFCEB7896CC93B00397B7943FD07 87271~|~1~|~1~|~01/STR~|~Paving project~|~05 - 4R Maintenance - Resurfacing~|~F6FB13E87DD52B252929875299CDD1D6750DEB00 122161~|~1~|~1~|~01/SAF/CAMB~|~SRTS - Replacement of sidewalks in the City of Cambridge / Guernsey County~|~28 - Facilities for Pedestrians & Bicycles~|~F47415A1E92F4970DE0EF3259E6A26A5487FC5A9 109056~|~1~|~1~|~01/NFP~|~Reconstruction of the POR IR 76 EB and WB rest areas.~|~44 - Other~|~8961F8441FA7625045B7D83B0D77D42E61412886 122787~|~1~|~1~|~01/SAF~|~All roundabout construction included in this split. ~|~21 - Safety~|~26D8B4ECBAE6CB2EDBAA5DB27B18B25C9760BFCC 123751~|~1~|~1~|~01/S>2~|~STP > 200,000 plan split~|~05 - 4R Maintenance - Resurfacing~|~E69D51B4681481CC762AEBB32FDF69E3DEB8ACEB 114731~|~1~|~1~|~01/NHS~|~FY25 Overlay~|~05 - 4R Maintenance - Resurfacing~|~8899173E9996A0138A92BB62824AA877E9D7B565 76153~|~1~|~1~|~01/IMS~|~Four-lane resurfacing project using an asphalt superpave treatment. WAS IR 77 12.16-16.41 (SB lanes only). Federal/State 90/10%.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~56DF8C30B23FA5EC625D07356BB0ED8A6E95DAFE 76282~|~1~|~2~|~02/S>2~|~93% of pavement and drainage quantities to use D6 STP funding (SLM 4.69-6.23 which is an large urban STP route)~|~05 - 4R Maintenance - Resurfacing~|~52A0DA3E22DCC5B061072270B86D1A8D94F0CB37 76282~|~1~|~4~|~04/S>2/FRA~|~100% Franklin County water line relocation~|~43 - Utilities~|~6B6DF37CC042709D7EA04B9E1041E58A55D67A94 76282~|~1~|~5~|~05/NHS~|~7% of pavement and drainage quantities to use D6 NHS funding (SLM 6.23-6.35)~|~05 - 4R Maintenance - Resurfacing~|~6C2BC7E44DA38299A2CCD9E95969AC72DE276487 76282~|~1~|~3~|~03/ENH~|~MORPC enhancement funding for street lighting, bicycle racks, stamped concrete/historical road signs/specific pvmt markings, and landscapingLocal sponsor is Prairie Township~|~31 - Landscaping & Other Scenic Beautification~|~8222C180AB882316046BD87D5C536D8389498728 76282~|~1~|~1~|~01/SAF~|~Safety funded project on FRA-40/West Broad from W of Hilliard Rome Rd to E of I-270.Median curb, signals, driveways~|~21 - Safety~|~CA259E018063C06880A968619FEA79DB5540AB88 76282~|~1~|~6~|~06/S>2~|~Added plan split (Part Code 6) for 100% Columbia Gas due to utility delays~|~43 - Utilities~|~A937DEFED6B01B194F7C7A505B3CD69CBAA9A8D0 76282~|~1~|~7~|~07/S>2~|~100% AT&T costs due to utility delays~|~43 - Utilities~|~35FC94E3843BD868F37A970FD6C6EDE7CBE55FE9 76282~|~1~|~8~|~08/S>2~|~Cost to accelerate project to keep on schedule due to utility delays~|~21 - Safety~|~D45EC9CBAF796F791DFAEAB443AB7FB5C63F59E4 107542~|~1~|~3~|~03/NHS~|~Resurfacing SR 151 from SLM 16.02 to 16.16~|~05 - 4R Maintenance - Resurfacing~|~837D9CD30C78ECB87B0383AC94E61AB5C17A064E 107542~|~1~|~1~|~01/STR~|~Resurfacing JEF-151 from SLM 11.99 to 15.52~|~05 - 4R Maintenance - Resurfacing~|~BE95D601702524608264B6033F07A7045942063E 107542~|~1~|~2~|~02/S<2~|~Resurfacing JEF-151 from SLM 15.52 to 16.02 (SR 7)~|~05 - 4R Maintenance - Resurfacing~|~4702A168D45126743C356A648CA80575F79B8E11 86651~|~1~|~1~|~01/NHS~|~Urban paving project with Columbus.FRA-33: SLM 14.35-15.40Dublin Rd from the leave Grandview Hts corp to SR-315FRA-33: 15.40-16.32Dublin Rd & Long St from SR-315 to Marconi BlvdFRA-33D: SLm 1.00-1.22Spring St from 4th ST to High St~|~05 - 4R Maintenance - Resurfacing~|~074ADA5F3D83D69D0600CDF9CDE72B3F500F3AA4 86651~|~1~|~2~|~02/NHS~|~D6 funding for work on 2 structures (patching, sealing):2501449 FRA US33 15.53 Intersect: Olentangy River2501473 FRA US33 15.53 Intersect: Olentangy River~|~05 - 4R Maintenance - Resurfacing~|~188D3A2013149E81FFE6E88B812388A7CFD3A613 86651~|~1~|~3~|~03/NHS/COLS~|~100% Columbus Items for pavement repair~|~05 - 4R Maintenance - Resurfacing~|~A070E6D1B52F6579E89274E92F711BD6CD6C461B 96143~|~1~|~1~|~01/NHS~|~01/NHS/OT; $500,000 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) Program. Funds needed over this amount will come from the District Preservation Program SACs 4PF7 and 4PS7.~|~44 - Other~|~C9F973F18DDC43A7DF7C2A947537A4A721740D58 110397~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EEF84DC120960A7CF919CBCC96F8C5FD44E31BD2 106268~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: DEL-36-11.29-12.45 DEL-36-12.70-12.81~|~05 - 4R Maintenance - Resurfacing~|~3631B5B47C927093305267657B92585C2AEF834A 106268~|~1~|~2~|~02/NHS~|~Pavement and misc items associated with resurfacing of US36 outside of the City of Delaware Corp Limit~|~05 - 4R Maintenance - Resurfacing~|~4F5F4E800C6237DBB2C97B4ACA87B0CB594BE740 91514~|~1~|~1~|~01/STR~|~General system resurfacing of MAR-47 from SR-257 to Waldo S Corp~|~05 - 4R Maintenance - Resurfacing~|~052D8626E43FC1976443BC4E896C9AB015091905 89151~|~1~|~1~|~01/BRF/CCEO~|~"01/BRF/BR/CCEO" - CEAO Funding 4B87 (80% Federal) / LNTP (20% Local) - CEAO CAP = $277,632.00 Federal requiring local match - Replacement of 1632639 COS CR17 0.07 Intersect: Simmons Run; BR Eligible for Replacement: Length=42 SD/FO(1) SR=42.3 DSR=6~|~10 - Bridge Replacement~|~D1C5AE68BC80F85D00031977070D5B2DF85D024A 121466~|~1~|~1~|~01/NFP~|~added plan split.~|~04 - Reconstruction - No Added Capacity~|~5499DB516539EA55E8BEFCEB362F12ECAD2EDD2A 84610~|~1~|~1~|~01/S>2~|~Replace or rehabilitate bridge CLE-28-0854 (SFN 1300067) over O'Bannon Creek.~|~10 - Bridge Replacement~|~60ECE1402EEB6E29AB9A320743AAECC4946C3478 118107~|~1~|~1~|~01/NHS~|~for turbo lane.~|~21 - Safety~|~D202DD58B0C46A7861D2DA2076A074C671D6E93D 118107~|~2~|~2~|~02/NHS~|~added for extended turn lane.~|~21 - Safety~|~8E183C9CB061E5DBE9A1ABE055469268F55188F8 111842~|~1~|~1~|~01/SAF~|~Install a mini-roundabout at the intersection of Miami Rd and Galbraith Rd~|~21 - Safety~|~4577BA463A520B22B62B9BA6BD24C4C46467DEDD 111842~|~1~|~2~|~02/SAF~|~Plan split for 100% locally funded work added via change order. Includes coloring stamped concrete roundabout center island.~|~21 - Safety~|~EF5FB8F64A813D04B8927C56D1C003529D287E0F 109705~|~1~|~1~|~01/NFP~|~Annual restriping in western D05 counties.~|~21 - Safety~|~6BCE2C28179B9F14B9C522712ACD1A04D8C42B6D 114999~|~1~|~1~|~01/STR~|~Lighting Maintainance~|~21 - Safety~|~65DAAE878E43C0E6B613CD23EF8CAC4ABBC7FBA3 100240~|~1~|~1~|~01/MPO~|~Repair and resurface Pearl Road using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~EE7C4CF454CD852A42F4286F282A926F658B508C 122749~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~3ECABD5063AD72674CBA886A71ADD0A2AC1D0C86 115770~|~1~|~1~|~01/STR~|~Emergency A Repair.~|~~|~E46F068B45D2FCA41E89814F65B31B4EC31638C9 115770~|~1~|~2~|~02/STR~|~Type B rock and delivery to the site. ~|~~|~C97C9EFE1926E6273B2526C201D61138947BAC30 111345~|~1~|~1~|~01/NFA~|~Split for paving work~|~~|~D74035952D97A331A17C617D868AE47E7511EADD 102018~|~1~|~1~|~01/S<2~|~Bridge deck replacement and other associated bridge items.~|~13 - Bridge Rehabilitation~|~285CE13B50D705F48D638ADFCFC06B38C37653F1 108259~|~1~|~1~|~01/CMQ~|~construction of a separated bicycle facility and enhancements that is eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~93E920D53513BA0309C66DB928D7BA0BB9373316 86760~|~1~|~1~|~01/IMS~|~Correction of landslide and noise wall along the existing R/W. Slide has damaged the noise wall at this location. 0.2 miles N of SR125 on IR 275 SB.~|~44 - Other~|~1606371887E98128C69B64A5217A45E8FE386E37 86760~|~1~|~2~|~02/NHS~|~Maintenance of soundwalls on BUT-129 and HAM-126~|~44 - Other~|~E711800CEF469D54B7AA1D98FF301453F1A5317A 86760~|~1~|~3~|~03/IMS~|~Maintenance of soundwall on GRE-675~|~44 - Other~|~45C888D338213B2EDC0DF838CCDE6E51844ACE2B 116622~|~1~|~1~|~01/NFP~|~Lighting~|~17 - Construction Engineering~|~A94E9BFC0FF141456FE817C5A41F7E5FA8402E54 101482~|~1~|~1~|~01/NHS~|~DSR# TUS-001~|~04 - Reconstruction - No Added Capacity~|~840C3DAA7F5600A8CC5F3C552644B40BBF67B6C0 93779~|~1~|~1~|~01/STR~|~Rebuild right deck edge using anodes, encase rear pier columns, overlay bridge deck with Microsilica overlay system, and remove and seal under deck spalls along centerline on SFN 5504864 MIA 721 0521 on Hog Run.~|~13 - Bridge Rehabilitation~|~20AC6394ACE5BAA9FA027655AA54857EC9E6B6C4 85608~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~9A9875ECE139687F1AF9E7984ABAFED2C58DF101 119384~|~1~|~1~|~01/S>2~|~Bike/Ped Trail Improvements Major-STP-Other Fed Aid~|~28 - Facilities for Pedestrians & Bicycles~|~25E2B7FAD48CD5FD6758F9D89F4F3DD7077C1BAD 119384~|~1~|~2~|~02/NFA~|~Bike/Ped Improvements Local-Not on Fed Aid~|~28 - Facilities for Pedestrians & Bicycles~|~079FEF3D36CE34CEDC86880370162CAD09CFDC38 124044~|~1~|~1~|~01/NFP~|~Plan split for tree and brush removal~|~99 - State Preventative Maintenance~|~AF8B261C0B4DC707EFB3BFA0CABDC58F2297FA8C 83349~|~1~|~1~|~01/BRF~|~Remove and replace the existing bridge with a three span prestressed concrete box or I Beam structure on County Road 86 in Miami County, SFN 5533589 MIA CR 86 2.01. Bridge is less than 20 feet so it does not qualify to use federal funds.~|~10 - Bridge Replacement~|~3E650978C2FA1E8159CFF98A8683B783E10F3D02 110270~|~1~|~1~|~01/NFP~|~Repair the deck edge and perform under pinning to the Englewood Reserve Pattys Bridge.~|~13 - Bridge Rehabilitation~|~409FAED33E2789DC33FA3A5052F6049B7D0A9411 123833~|~1~|~1~|~01/NFP~|~Plan split for bridge maintenance activities utilizing 100% State funding~|~47 - Bridge Preventive Maintenance~|~8E80312C3C48C816ACA0CF9532E2CDB09DCBE1D0 110002~|~1~|~1~|~01/STR~|~Culvert repair/replace~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1222D2129AA4CD7B6058252C7E644FC0B11EDFD6 92095~|~1~|~1~|~01/BRO~|~6200664 OTT TR35 26.4 Intersect: Twp Rd 35 (Lightner Road)~|~10 - Bridge Replacement~|~FD59744196C10276888E3CA03D06810CA03821E7 82979~|~1~|~1~|~01/NFA~|~Major Rehabilitation Funding (4MT7) - No Cap - FDR treatment on COS/KNO 715~|~04 - Reconstruction - No Added Capacity~|~A6BC29F7944166200391D5BD957661F901710EDF 116101~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~1242D694E14251C524C47A0DA75C51FBDE2D85B8 104502~|~1~|~1~|~01/SAF~|~All work on US 36 except surface course and pavement markings~|~21 - Safety~|~DE6DE310227085FCCE3F3CFF8A54EB440D129166 104502~|~1~|~2~|~02/STR/Del~|~Work on Galena Rd CR 34) North & South~|~04 - Reconstruction - No Added Capacity~|~F02E0F9A22D88BD57913F4F7C2FC334F57B5DEEC 104502~|~1~|~3~|~03/NHS~|~Surface course and pavement markings on US 36~|~05 - 4R Maintenance - Resurfacing~|~E5A64369CE29AE1381E2BECE97F0958D8DE66DE8 79798~|~1~|~1~|~01/STR~|~LAW SR93 6.11 @ Pine Grove Road - Intersection ImprovementBegin project 0.48 mile north of TR1329 (Valley Rd.) (SLM 6.11) and end project 0.41 mile south of TR169 (Ellisonville Rd.) (SLM 6.77). It is proposed to improve the intersection of SR93 & CR26 (Pine Grove-Smokey Row Road) by constructing a left turn lane on SR93 to service CR26. 80 Fed/20 state 01/STR/PV/State~|~04 - Reconstruction - No Added Capacity~|~9EB3B2BEE57B5FFC49AEB3C01AF8853264D4C928 117955~|~1~|~1~|~01/SAF~|~Work on IR 71 and US 35 ramps~|~21 - Safety~|~53E0F8ABB80F6FC48E2BDE7F79529DC61766AE93 117955~|~1~|~2~|~02/SAF~|~Work on SR 435~|~21 - Safety~|~EF0EF3AECB935B5012E287E773DD7A997952597F 121502~|~1~|~1~|~01/SAF~|~Guardrail replacement/adjustments~|~21 - Safety~|~173E170F126280F9F5D3465BE484D54182991E74 127000~|~1~|~1~|~01/STR~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~6868B264469D96EB9C3DA493C8BCC3387315AE36 93834~|~1~|~1~|~01/STR~|~Bridge ReplacementHIG 138 23.62~|~10 - Bridge Replacement~|~FD8A4E5873DE06DDEB878857B3F2874E25992FDC 102125~|~1~|~1~|~01/STR~|~CEAO STP federal funds (4B77) and LPA funds (LNTP); 80%/20% respectively.~|~05 - 4R Maintenance - Resurfacing~|~CF919F1CEC22916E941836F5E21FE9AD51512325 94503~|~1~|~1~|~01/NFP~|~District wide RPM plan for FY 17 systematic RPM replacement~|~21 - Safety~|~8AA54C28972D6E7B03921016ADC13C2AE31AD9D9 105857~|~1~|~3~|~03/IMS/DEOG~|~Items associated with Dominion East Ohio Gas line on the structure.~|~43 - Utilities~|~A64B393C41F50763FA93E128065CAB8B3CF2AC42 105857~|~1~|~1~|~01/IMS~|~Deck replacement and superstructure replacement >20' span.~|~13 - Bridge Rehabilitation~|~380EF0DAA29F8C9E83089DC3A9FDE08A0CE3B82B 105857~|~1~|~2~|~02/IMS/YTOW~|~Items associated with City of Youngstown waterline on the structure.~|~43 - Utilities~|~C6C131F35906745A585AD65E4A87CAB2436A2ACE 105857~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~7F796CA522E853C980D1A7FE48559805F11647D8 119172~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~8E9F17DC54F44D80D185A5C97BCBF289C569EEBC 109199~|~1~|~1~|~01/NHS~|~Slide repairLAW 52 22.09~|~04 - Reconstruction - No Added Capacity~|~905427AE5F808B211E4C3059AD13EC27A3CF6399 107863~|~1~|~1~|~01/STR~|~Federal Disaster Relief Funds - 4BY7 (80% Federal) / 4BE7 (20% State) - No CAP - Repair of the slip above the roadway - Gue-US 40-14.31~|~21 - Safety~|~E1A468907551DF42E24A01845A5A5E23D2D87D99 109618~|~1~|~1~|~01/S<2~|~Resurfacing JEF-43~|~05 - 4R Maintenance - Resurfacing~|~A79E05BD9D13C5DCF57AF00F4442696DF52E3867 109618~|~1~|~2~|~02/NFA~|~Asphalt resurfacing of "Service Road D" in the villages of Empire and Stratton due to a maintenance agreement.~|~05 - 4R Maintenance - Resurfacing~|~AF1F95F2DA6B55FAAD1368743A3D48A6E724029E 109618~|~1~|~3~|~03/S<2~|~Asphalt resurfacing within the City of Steubenville, SR 43 from SLM 4.38 to SLM 4.48.~|~05 - 4R Maintenance - Resurfacing~|~F819FBF1F8AEE217F9BFEAAD3CE6EFCFE69FF9F0 92848~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~59B69F7B9F8F22ABF31B3A03B5763B679AE5977D 119418~|~1~|~1~|~01/BRF~|~Bridge replacement project~|~10 - Bridge Replacement~|~48DE66CEC6CA5A2E205F23A9A6E239380C45E9AB 88845~|~1~|~1~|~01/STR~|~Resurfacing with rural STP funds. Funding from the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7.~|~05 - 4R Maintenance - Resurfacing~|~32383B20E0E6C095F44E160E54D7FAD300C44ECE 95098~|~1~|~1~|~01/S<2~|~Extend East High St from Mill St to Orr St~|~01 - New Construction~|~6E98570C152F89192EA217F923C2917B9CE7F0A7 113960~|~1~|~1~|~01/MPO~|~Resurfacing eligible items.~|~05 - 4R Maintenance - Resurfacing~|~24F52E5DBA5F49C6756FD5A023CF7BE21FB7F28F 113960~|~1~|~3~|~03/MPO~|~Lorain County portions.~|~05 - 4R Maintenance - Resurfacing~|~6C87355EA038C3088CF96BC4B5B4069A7F133300 113960~|~1~|~2~|~02/MPO~|~City of Vermilion Portion~|~05 - 4R Maintenance - Resurfacing~|~68EB290103E1B77161FE9BAF7A5AC5FD3A715309 103363~|~1~|~1~|~01/BRF~|~Local bridge removal.~|~40 - Special Bridge~|~C2DEE1EBB74D575BDD95046A5477F3CEB50FA59C 124134~|~1~|~1~|~01/SAE~|~Safety work at signalized intersection of SR-63 & Lawton Ave, Main St and Britton Ln~|~21 - Safety~|~6FFB6AB600BA5E7F0DD2C1CC6D6F479FF8568D77 127092~|~1~|~1~|~01/NFA~|~SOPEC EV charger projects ~|~63 - Electric Vehicles & Charging Infrastructure~|~E6CAF3A418D1E40568E61716ED4F9A31430F2C2F 100670~|~1~|~1~|~01/NHS~|~This plan split is for the highway lighting replacement at the BEL 7 8.14 interchange, the BEL 7 11.62 interchange and the BEL 7 13.62 interchange.~|~01 - New Construction~|~A5620222EEEF6AC070FB36B17CC33CCCF674ED7F 116722~|~1~|~1~|~01/STR~|~All work is in this plan split.~|~21 - Safety~|~CD191E566B548D4AA5A9E6E27AA94D9211DF1B81 111929~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using a concrete pavement repair. WAS 77 6.63-17.64. Interstate route funded 90% Federal/10% State.~|~05 - 4R Maintenance - Resurfacing~|~FA8EA9EF88C8C56AFFFAD2446EB0FE51315A3148 116499~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during project scoping.~|~13 - Bridge Rehabilitation~|~A157107C6465708D85D3806DA1776C954BDAD6B0 113943~|~1~|~1~|~01/NFA~|~Chip seal project. MOE 260 0.00-4.33, WAS 260 0.48-9.76, 9.98-11.00. Not on the federal aid system. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~000A7C5162FC257D6B7E4869D4249B42CFB64FF3 113943~|~1~|~2~|~02/STR~|~Chip seal project. NOB 821 13.22-21.36. ~|~05 - 4R Maintenance - Resurfacing~|~FF3BB0446511BDFA1DC38AF56EC039ACC776256C 108240~|~1~|~1~|~01/MPO/BARB~|~Reconstruction of Wooster Rd from Hudson Run Rd to 2nd St NW.~|~04 - Reconstruction - No Added Capacity~|~83B1722224C7E5F8A493936EAC0E60CD1B638D07 108240~|~1~|~4~|~04/NFA/BARB~|~Widen existing sidewalks on bridges.~|~13 - Bridge Rehabilitation~|~D98679D04D3A0A3468383EB435026C0EF408B3C1 108240~|~1~|~3~|~03/MPO/BARB~|~Resurfacing, Wooster Rd from 31st St to Hudson Run Road.~|~05 - 4R Maintenance - Resurfacing~|~192AB1CA5F3925760C7B57EBF4D719FC1A846FE1 108240~|~1~|~2~|~02/SAF/BARB~|~Reconstruction of signals along Wooster Rd in Barberton.~|~21 - Safety~|~A000E2A37CE27E3AB0D1E039A47B7B20F6514A9D 108240~|~1~|~5~|~05/NFA/COUN~|~Concrete Overlays for Wolf Creek and Hudson Run bridges only requested by the Summit County Engineer.~|~13 - Bridge Rehabilitation~|~E2921157F90ADCE897C5674620E7E14ED387979F 98726~|~1~|~1~|~01/NHS~|~Emergency culvert repair.~|~04 - Reconstruction - No Added Capacity~|~C7A1351217CE19130730679CCBEDB8EBC3C91D84 110797~|~1~|~1~|~01/SAF~|~Improvements at the intersection of US 23 at SR 750 (Powell Rd)~|~21 - Safety~|~B856E17EC0C654E0D77805E4DEFD707493FB5220 123850~|~1~|~1~|~01/SAE~|~100% CEAO HSIP Funding (4HB7)~|~21 - Safety~|~8080E31865E5D8BB807597330EE047625249A8A3 101944~|~1~|~1~|~01/NHS~|~Bridge Repair from Accident Damage. WAY-30-16.61 (SFN 8502153)~|~13 - Bridge Rehabilitation~|~3294C092FD4C82ADEE794E40B4F1A4A8ECE34189 98349~|~1~|~1~|~01/SAF~|~Lighting upgrade/replacement project on MOE 7 12.57-13.07 and WAS 7 38.75-38.88 for FY2019. Funded 80 federal/20 state.~|~21 - Safety~|~2E3DE2CA9437A3C0AAB9719FB0FFEE0C762B7FC6 91213~|~1~|~3~|~03/STR~|~Remove asphalt wearing coarse on box beam bridge, waterproof, and overla with asphalt. SFN 4601963 LOG SR 235 4.74~|~13 - Bridge Rehabilitation~|~6A68D0CA44BC6923A904726582B0510D8A31B8BA 91213~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with pavement repairs. LOG SR 235 0.00 to 8.18.~|~05 - 4R Maintenance - Resurfacing~|~8CDCA751332491658FC4C671FB8134D3D89AAD72 91213~|~1~|~2~|~02/NFA~|~Resurfacing of the existing roadway with pavement repairs. LOG-SR-235 0.000 to 8.180~|~05 - 4R Maintenance - Resurfacing~|~E95B476FBDBE2AF5BEB063CDA90EA93713D813B0 95947~|~1~|~1~|~01/NFP~|~CNG trucks to be deployed in Canton.~|~44 - Other~|~B2BB16A2DE59E310985D696862450F1161715FEA 106377~|~1~|~1~|~01/STR~|~Construct H-pile wall at the intersection of SR 39 and SR 164 in Salineville, COL County to stabilize the roadway.~|~44 - Other~|~443F5468CDD2EE8CEE3CC1BE7E281D9764B9101D 116507~|~1~|~1~|~01/STR~|~Resurfacing using District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~C22EDA21D81BD2ECCE6B3C917FACD98108277363 116507~|~1~|~2~|~02/S50~|~Resurfacing. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~A3B8B8A0FA4E09DDE8E0E56CB28575059C38D5C5 116507~|~1~|~3~|~03/SAE~|~Adding centerline rumble strips throughout the length of the project. Funded 100% with safety funds.~|~21 - Safety~|~8B38161AEE1AD4BDB8234662D4992838BE2B78F2 102827~|~1~|~1~|~01/NHS~|~NHS pavement~|~05 - 4R Maintenance - Resurfacing~|~232F39D3118C633787F3158AB0DBAE4B2175D229 102827~|~1~|~2~|~02/NHS~|~NHS bridge~|~13 - Bridge Rehabilitation~|~4817B3E9716C9429FE017280906E3B1A9E293758 102827~|~1~|~3~|~03/STR~|~STP Rural Pavement~|~05 - 4R Maintenance - Resurfacing~|~DDB2E2151AD9C7AA6F1D968B53721CD97937BC4A 122361~|~1~|~1~|~01/S>2~|~Plan split for bridge replacement and bridge rehabilitation~|~10 - Bridge Replacement~|~3C30348A3281CB7A58A845550D98E35FAAC58F65 84563~|~1~|~1~|~01/S>2~|~Resurfacing of State Route 82 from SLM 0.14 to SLM 0.61, Sagamore Hills Township, Summit County, Ohio. Originally STP Rural, was converted to STP>200 with latest 2030 Urban Boundary update.~|~05 - 4R Maintenance - Resurfacing~|~2F117B0E9C24FE6616D23E69E5DF70C106E20F6D 84563~|~1~|~2~|~02/S>2~|~Resurfacing of State Route 82 from SLM 0.61 to SLM 1.56, and then SLM 2.14 to SLM 3.47 Sagamore Hills Township, Northfield Center Township, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~C27834C8C28BC6DE4295EEC82F45180D39E4FB9B 84563~|~2~|~6~|~06/S>2~|~Cleveland water pipeline reconstruction.~|~43 - Utilities~|~D01AE31B9279B3475E7A023D3A18785200B3148D 84563~|~1~|~3~|~03/S>2/Mace~|~Resurfacing of State Route 82 in the City of Macedonia, from SLM 3.47 to SLM 4.05, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~E463F8F87FFC35F6EDF63C599322A72FF5A6B43F 84563~|~1~|~4~|~04/S>2/MACE~|~100% Local items included in the resurfacing of State Route 82 from 3.47 to 4.05 within the city of Macedonia.~|~05 - 4R Maintenance - Resurfacing~|~FE7DAC4AF751421C145F163774547300CA9B817B 84563~|~2~|~5~|~05/SAF~|~Widening of State Route 82 between SLM 1.56 (Holzhauer) to SLM 2.14 (Boyden), Sagamore Hills Township, Summit County, Ohio.~|~21 - Safety~|~FF48390B393A2B6B8D9CD4153067B652BCFA935A 80441~|~1~|~1~|~01/MPO~|~All the work not in the Enhancement split is in this split. The earmark funds should be used first. Then the TRAC funds. Next use the Safety Program funds. After that use the SIB loan funds which will be repaid with MPO funds. Last use events with 100% local funds.~|~08 - Bridge - New Construction~|~4DE4ACAAC624B9EE4D486350AE465939BD6A825C 80441~|~1~|~3~|~03/MPO~|~Costs for sign on the bridge. MPO funds can be used for these costs. TRAC, Safety and Transportation Alternatives Program funding cannot.~|~31 - Landscaping & Other Scenic Beautification~|~FB7ADF22E694D66987D0414ABCEB1FD02DF5716F 80441~|~1~|~2~|~02/ENH~|~Work funded with funds by the Transportation Alternative Program. 95% federal with a 5% local match.~|~28 - Facilities for Pedestrians & Bicycles~|~332079BB17D85F7FBBE4F07B102306C6BDFE4B00 112817~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~65E3514DED15FFE4FF2B811E5B201575C6C74F6A 112817~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~378FCF50977EA99ECDB56E969C4F81E5571ED64C 112817~|~1~|~4~|~04/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~3AA71C696E88035EBC0500C1FE5C062CB0AC4E34 112817~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~B6A74D029EC445168280FC72E6739A435E54D5BD 115772~|~1~|~1~|~01/STR~|~Bridge replacement.~|~04 - Reconstruction - No Added Capacity~|~B89AEC9F2B78390320A8E2912A6A0639CF54EB24 127054~|~1~|~1~|~01/ENH/MILL~|~Reconfigure entrance corridor.~|~04 - Reconstruction - No Added Capacity~|~B2902EC9F89545AFC7F332BAF8B9BF233F1C7933 96452~|~1~|~1~|~01/S<2~|~Widening of Cincinnati Dayton Road from West Chester Road to north of the Lesourdsville West Chester Road/Station Road intersection. Realignment of Station Road with Lesourdsville West Chester Road to improve the geometrics at the intersection with Cincinnati Dayton Road.~|~03 - Reconstruction - Added Capacity~|~82D77B92591FC918DF7B196A36FF683A825A5930 96452~|~2~|~2~|~02/S<2~|~Widening of Cincinnati Dayton Road to provide an additional center turn lane and southbound thru-lane between Lesourdsville West Chester/Station Road and the IR-75 NB on-ramp.~|~21 - Safety~|~5F3C7F0520173C47E01A016EDD89CCF7CA469706 96452~|~2~|~3~|~03/ENH~|~Replacement of existing sidewalk and installation of new sidewalk along Cincinnati Dayton Road between Lesourdsville West Chester Road/Station Road and the IR-75 NB on ramp.~|~28 - Facilities for Pedestrians & Bicycles~|~FBC33C123E2493AEA9DDD7531022E012C68B97AD 96452~|~1~|~4~|~04/S<2~|~Plan Split for 100% Waterworks Items included in the project (phases 1 and 2).~|~43 - Utilities~|~C1B2986829F70D61912E4D2AE50DF92D7BE814EF 113197~|~1~|~1~|~01/MPO~|~Spit for MPO-funded work~|~28 - Facilities for Pedestrians & Bicycles~|~1DC0077010C835FE2BB0CBF09225B772A2139A3A 113197~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~28 - Facilities for Pedestrians & Bicycles~|~1768CCBB5A0A001BEBCCEA8A17E8E6A5F88D928E 111571~|~1~|~1~|~01/NHS~|~2 1/2" mill and fill with superpave asphalt on: MOT-48 ALM 6.49 to 6.95 in the City of Kettering.~|~05 - 4R Maintenance - Resurfacing~|~88012092238F75FD09A00B41235F15D6A82C58A7 121119~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~3AB12EC1996DE48C9E98713A218944C75792227C 121811~|~1~|~1~|~01/NHS~|~Pavement work to widen US 33 in southeastern Franklin County from 2 to 3 lanes in each direction.~|~03 - Reconstruction - Added Capacity~|~B66E773A406F7E952EC41B1C502FB994B1370D2F 123788~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~A9D888F9C59068B7B28BF82E349976D40528A3B1 124381~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of ferally eligible bridge on the interstate system~|~13 - Bridge Rehabilitation~|~54B636B470FEDDB7A1DEE5D2BD09F44538958604 95352~|~1~|~1~|~01/S<2/SCI~|~It is proposed, on CR50 (Washington Blvd), begin @ SLM 0.00 (CR482) and terminate @ end of route, SLM 2.42 (SR73), to resurface, widen, make horizontal & vertical alignment changes, perform base repair, curb & gutter, storm sewer, culverts, traffic control, and other repairs as needed. Local Let80/20 split w/fed max of $1,631,200.00~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FF93F01127BFD07A1CB37FE555D5ADB4B8DC9773 124809~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~F6C574B0D79BD2F6827DC92151A9629FF34BD951 115746~|~1~|~1~|~01/NHS~|~Plan Split for the 80/20 (ODOT/City) items on the urban paving resurfacing ~|~05 - 4R Maintenance - Resurfacing~|~3C4B0239B3A6A2935D653146CA93CAD01AF6ADE5 115746~|~1~|~2~|~02/NHS/FRK~|~Plan Split for the 100% City items~|~05 - 4R Maintenance - Resurfacing~|~CC5E8508FD56F0801ACBEDA0AB8BE7C99106F98E 95356~|~1~|~1~|~01/NFP~|~Craig Bridge~|~44 - Other~|~D0B9AF46C412730E3E40C1C648268C4C3CCF68A5 102285~|~1~|~1~|~01/NFA~|~Design and construct salt storage building and a loader building on Scio Outpost/Yard site.~|~44 - Other~|~23D7D08D437FC3D366918B7EDEA7696CB0DBD1AB 100750~|~1~|~2~|~02/NHS~|~Bridge painting project. MOE 7 21.48 (SFN 5600669). NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~3E064D1FD70F9390C45D74BA3F64D3F149DFBAA2 100750~|~1~|~3~|~03/S<2~|~Bridge painting project. WAS 339 1.24 (SFN 8403996). Urban other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~931FB2551BD3AACA21B675B722F50C03AD82BB41 100750~|~1~|~1~|~01/IMS~|~Bridge painting project. NOB 77 3.62 L (SFN 6100279), R (SFN 6100309), NOB 77 13.96 (SFN 6100783). Interstate route funded 90 federal/10 state.~|~47 - Bridge Preventive Maintenance~|~9660AF0B3B24F66713036691661197B23B69ECFB 126960~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 14 over the Railroad.~|~10 - Bridge Replacement~|~ADDF3EE760BC980477B4CE4D06F382B0C0C7777E 119191~|~1~|~1~|~01/STR~|~Plan split for OTT-19-0112 and OTT-51-0584 bridges~|~13 - Bridge Rehabilitation~|~15CC08DB594F830B2041834DB922185CD6AF834C 126807~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~7CAA75794E486FDEE46C19F168E2E75777C012CF 115785~|~1~|~1~|~01/SAF~|~Safety work~|~21 - Safety~|~8CD704F2DE6EC571B65372523D8340634626A3DE 115785~|~1~|~2~|~02/ENH~|~100% LNTP item(s)~|~31 - Landscaping & Other Scenic Beautification~|~6D0337A6F72C2F27C34C8F6C806B7A6696C985A1 90951~|~1~|~2~|~02/IMS~|~Interstate: ASD-71-8.47 / ASD-71-9.95~|~13 - Bridge Rehabilitation~|~8CA0087DC7000EB11039E722A8FC4EDC1A00681E 90951~|~1~|~1~|~01/NHS~|~NHS: WAY-30-3.26 (L&R) & WAY-30-1.00 (L&R) & WAY-0003-11.97~|~13 - Bridge Rehabilitation~|~4C296F7576F951DB2BA3FC41A230D30153B17547 101234~|~1~|~1~|~01/NHS~|~Resurfacing SR 184 0.35-1.86.~|~05 - 4R Maintenance - Resurfacing~|~462591978FFAC3D3F14C34B8952C140BEA694E86 96142~|~1~|~1~|~01/IMS~|~Pavement repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9606940752FFB0158F01D7D6EDCC3A94B39D01C3 120439~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~50D3D347F037B07E8DA482E345D5D2307925774E 97723~|~1~|~3~|~03/IMS~|~"03/IMS/OT" - District Preservation 4PS7 (100% State) - No CAP - maintenance repair for damaged tower light pole on Gue-IR 70-08.69.~|~21 - Safety~|~0139076E960522131B986BBE878C060553483424 97723~|~1~|~2~|~02/IMS~|~"02/IMS/OT" - District Preservation 4PS7 (100% State) - No CAP - maintenance repair for damaged tower light pole on Lic-IR 70-17.38.~|~21 - Safety~|~AAA3713F204514063DD68791548C27F2F8E37CBE 97723~|~1~|~1~|~01/IMS~|~"01/IMS/OT" - District Preservation 4PS7 (100% State) - No CAP - maintenance repair for damaged tower light pole and vertical truss member on Fai=IR 70-01.85.~|~21 - Safety~|~B95510EFB773A179A4986B3D89B5CFAE3EFC95AB 118750~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~8AFA041959378929BFA380D5FE2E0D0E5DD15619 97205~|~1~|~1~|~01/NFA~|~This project is for construction inspection in FY14 and FY15.~|~17 - Construction Engineering~|~5D295865302188DFA695AB52C3AC9D9CA59CCFD8 124335~|~1~|~1~|~01/SAF~|~Intersection improvement.~|~21 - Safety~|~62050D8A198B2D59D5E957174BCF0F01999D5D13 117733~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~733B215BBE2E343CB5DF97BABAEE1F1E2981752F 109872~|~1~|~1~|~01/NFP~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~4E1227D730592E8C3B67E05541F8921653AB7C8A 121307~|~1~|~3~|~03/S5K~|~Urban Paving Plan Split~|~05 - 4R Maintenance - Resurfacing~|~092CCB63034A4D5F36963C73C1F138131D4C01F2 121307~|~1~|~4~|~04/NFP~|~Plan Split for 100% locally funded scope in Bellevue, such as full depth pavement repairs~|~05 - 4R Maintenance - Resurfacing~|~C7BE811361643CB6F6CBFFB2E7F17C0DCD139BD2 121307~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SEN-18 from SLM 30.476 to 34.728 and SAN-18 from SLM 0.00 to 0.764~|~05 - 4R Maintenance - Resurfacing~|~4309285A315C24FD47BB2ADA7E796779F042E191 121307~|~1~|~2~|~02/S5K~|~Plan split for resurfacing on SAN-18 from SLM 0.764 to 0.864~|~05 - 4R Maintenance - Resurfacing~|~AB42626A11E31364B64E6A3F8A2CCB2A0A8CB729 109252~|~1~|~1~|~01/NFP~|~Spot paving on various routes within POR, STA and SUM Counties.~|~05 - 4R Maintenance - Resurfacing~|~21C9B36FBD096245DA9A4AC5C423E0663806CBA8 95745~|~1~|~1~|~01/BRF~|~Bridge deck replacement, painting of existing beams and cross frames, and bearing repairs.~|~13 - Bridge Rehabilitation~|~DE66F453D3A11CEF602FB0B36F588380F00F7EB4 118732~|~1~|~1~|~01/NFA/AKRO~|~Bridge replacement~|~10 - Bridge Replacement~|~617CB435B9CE0A5E2689D53DD1118E0CD3EB9218 104763~|~1~|~1~|~01/S<2~|~Pavement Marking on various county roads using 100% 4HB7.~|~21 - Safety~|~46641B34DCEE9677D0A310B4E08A456CE57FC78E 102280~|~1~|~1~|~01/NFP~|~Removal of damaged structure items~|~10 - Bridge Replacement~|~581D1D253B934A4DD81FFB04D5B83E4DB2D9D315 93983~|~1~|~1~|~01/NFA~|~Brdg replacement On TR 99, Mackletree Road, 4.81m 0.29 miles from where it ends and intersects with SR125, it is proposed to replace the structure (SFN 7332882). 80% fed/20% local 01/NFA/BR/State~|~10 - Bridge Replacement~|~022AAFFBA15D45FE0BFA3B52C047729F3AF6ABC9 93983~|~1~|~2~|~02/NFA~|~Environmental Mitigation work.~|~10 - Bridge Replacement~|~EDB12B4F1981BD231DD1EC15323B784ABA1A8423 88129~|~1~|~1~|~01/IMS~|~Replace railroad bridge over I 75 southbound. Plan split for Part 1 work (PID 88129).~|~03 - Reconstruction - Added Capacity~|~E4B6C1F22B89AC75D52A169FE084FA11FE5EA2C8 88129~|~2~|~2~|~02/IMS~|~Plan split 2 is for Part 2 work (PID 122358). Construction of a portion of ramp/CD road improvements under the existing railroad bridge north of Galbraith Road.~|~03 - Reconstruction - Added Capacity~|~25E2C5039A7A468A75FFFCFCA26749BA0F41E4B7 123000~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~701A491C28ADFF0EFB75797E1F5F9E4CE83F40E7 107715~|~1~|~1~|~01/MPO~|~Fiber optic interconnect through existing conduit to Clete McDaniels Sports Complex and Schuler Sports Complex. Also finalizing fiber work related to interconnection of signals and cameras on Montgomery Road, Kenwood Road, and Galbraith Road.~|~21 - Safety~|~997EF6DE001A8F7C792358F2234456D1708BBA84 98137~|~1~|~1~|~01/S<2~|~PIK 551 & 552~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8FDD711EC85F86AA4CBC88AA903913642D0C9310 84943~|~1~|~1~|~01/BRF~|~7153457 ROS CR600 3.06 Intersect: Indian Creek80/20 split local match Ross County. 01/BRF/BR/ROS~|~13 - Bridge Rehabilitation~|~D045747D5BD8B7F80965FB5D7F59F3FA4635C45E 119980~|~1~|~1~|~01/CMQ~|~Replace two way stop controlled intersection with a traffic signal and turn lanes at indian Ripple Road and Factory Road~|~21 - Safety~|~74B42B4E338B23751E31CC2129C5CC3AD44A2963 124872~|~1~|~1~|~01/SAF~|~Primary plan split for CEAO Safety funding~|~21 - Safety~|~14AFC393AB6A15FD1B3F57803E42571618786A90 75143~|~1~|~1~|~01/SAF/FCEO~|~"01/SAF/PV/FCEO" - CEAO Safety Project 4HB7 (80% Federal) / LNTB (20% Local Match) - CAP Federal CAP of $1,984,320.00 requiring $496,080.00 local match. Fai-CR 17-03.56 to 04.08; widening with full depth replacement and should additions with new overlay.~|~05 - 4R Maintenance - Resurfacing~|~09D4ED7F44683AD45A35D1F3D85B2976489E1472 96657~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 50 3.58-4.42, WAS 7 4.42-7.18 and WAS 618 1.40-1.86. Funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~E58998C0D5E376029E1795C8C474889C349DD2ED 96657~|~1~|~2~|~02/S50~|~Two-lane resurfacing project using an asphalt overlay treatment. WAS 618 0.16-1.40, 1.86-3.22. Funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~AAF96DA685281BD793D6425BF1A46276E1A2B784 96657~|~1~|~3~|~03/SAF~|~Safety widening on WAS SR 618 0.47. ~|~05 - 4R Maintenance - Resurfacing~|~89A83BD5430349EE75CD1619AAF26D241E2AC152 113863~|~1~|~1~|~01/SAE/KCEO~|~"01/SAE/PV/KCEO" -100% Safety (4HJ7/TRC) - widening CR 14 for paved shoulders.~|~21 - Safety~|~1978731D0F3B8EF3C43D30A3D96BE971316F1403 120648~|~1~|~1~|~01/MPO~|~Plan Split for scope eligible for MPO Carbon Reduction Program funding~|~28 - Facilities for Pedestrians & Bicycles~|~E1DD2D945F58E217C44077027C9FAFF50E24E2C0 92098~|~1~|~1~|~01/CMQ~|~Project includes installation of a centralized County Traffic Management Center (CTMC) at the CCEO to control 49 existing traffic signals, adaptive signal control system at 12 signals in the Eastgate Retail District and associated detection systems, signal controller replacement at 9 signals, signal controller upgrades for IP communications at 40 signals, installation of communication network including 3G/4G wireless service equipment, LED upgrades at 37 intersections and 17 school zone flashers, video detection upgrades at 28 intersections, loop detector replacement/repair at 14 intersections, PTZ camera installation at 18 intersections, ped signal upgrades at 8 intersections, pushbutton upgrades at 3 intersections, controller cabinet maintenance pad installation at 9 intersections, stream monitoring gauge near the intersection of Locust Corner Rd and Nine Mile Rd, support for future system capabilities including Smart Work Zones for CCTID RTIP projects, integration with ODOT traffic systems, emergency vehicle preemption, etc., and associated ADA curb ramp installation/upgrades.~|~21 - Safety~|~57283A90487B44EF35425CCBCEC8FFC682A09A15 97907~|~1~|~1~|~01/ENH~|~Gettysburg Ave from Kammer Ave to Fairbanks Ave - Hoover Ave from Marvine Ave to Bedord Ave - This project will install pedestrian amenities such as replacement of defective sidewalks and curbing, the installation of banners, decorative lighting and other assorted amenities.~|~28 - Facilities for Pedestrians & Bicycles~|~E85561A31BD3E81BB4C769DFCA204D20C3BB606E 115646~|~1~|~1~|~01/S>2~|~SR16 (East Broad Street) from Outerbelt Street to Reynoldsburg-New Albany Road. Major widening from four to six lanes including intersection improvements.~|~21 - Safety~|~97DDB3C93FD786EB9FC52DCAA1748B6F9CC13F8A 97553~|~1~|~1~|~01/BRF/MED~|~SFN 5233240, Ohio Bridge Partnership Program, West Smith Road over Champion Creek~|~10 - Bridge Replacement~|~370BEB7D21027D9B1DC662CDA6848E86373CD7D2 97553~|~1~|~3~|~03/BRF/MED~|~SFN 5265894, Ohio Bridge Partnership Program, N. Harmony Street over Bradway Creek~|~10 - Bridge Replacement~|~4FBEFA646AA51EC3D24B185085231EFF80854401 97553~|~1~|~2~|~02/BRF/MED~|~SFN 5235537, Ohio Bridge Partnership Program, Bagdad Road over the West Branch of the Rocky River~|~10 - Bridge Replacement~|~D755323C6F4629DF88917E8E17F68E91682EEB60 121932~|~1~|~1~|~01/NFP~|~Plan split for replacement of existing queue warning signs and installation of a new queue warning sign on I-675 in Greene County. Funded by TSMO.~|~24 - Traffic Management Engineering - HOV~|~6A53653E2828B6F679AE00CE2D12308CED517C3F 121932~|~1~|~2~|~02/NFP~|~Plan Split for ITS focused locations~|~24 - Traffic Management Engineering - HOV~|~573FD8C276860DA31DB4DA657D8412C8C1607FBC 113160~|~1~|~1~|~01/ENH~|~Construct hike and bike trail between 3rd Ave and Exchange St in the city of Akron.~|~28 - Facilities for Pedestrians & Bicycles~|~8918098AFC7963238F4EA0426DA3123F7A4BE320 106302~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4.~|~~|~BCBB89DCAAC1A9362E3F069400AB37B52CEEE790 95221~|~1~|~1~|~01/IMS~|~Concrete bridge deck replacement NOB 77 0362 R (SFN 6100309). Interstate route funded 90 federal/10 state.~|~13 - Bridge Rehabilitation~|~5DA1B377D3763ED131D53CB21351A56703CBC910 113221~|~1~|~1~|~01/NFP~|~D9 culvert project FY26~|~04 - Reconstruction - No Added Capacity~|~8223B031B6E072E6AA9F6191CBEC3BBD72FC1F8F 126055~|~1~|~1~|~01/NHS~|~nhs~|~05 - 4R Maintenance - Resurfacing~|~91557D84CD75B9DF46818FC8B53A6F225C7A90B0 93154~|~1~|~4~|~04/S<2~|~WCH urban paving of FAY-753: 11.66-12.58In WCH func class area~|~05 - 4R Maintenance - Resurfacing~|~15A18BB21FEF51E77933E72DFA5CE666129FA6F6 93154~|~1~|~2~|~02/STR~|~General system paving of FAY-753: 10.51-10.72STP route in rural func class area~|~05 - 4R Maintenance - Resurfacing~|~9747A79634897CB9B889175F7D91E3794A94100A 93154~|~1~|~3~|~03/S<2~|~General system paving of FAY-753: 10.72-11.66In WCH func class area~|~05 - 4R Maintenance - Resurfacing~|~A14A876C0BBDABA506FC4E50E7B9A827E272BD57 93154~|~1~|~1~|~01/NFA~|~100% state general system paving of FAY-753: 0.15-10.51~|~05 - 4R Maintenance - Resurfacing~|~CD7D9D6E7E5FE0F01D26B579DFC00154A38B66F5 102583~|~1~|~1~|~01/STR~|~Work on US 68 in Hancock County from beginning of the project at 1.04 to the Findlay Urban Area boundary at approximately 11.66 which is just before the ramp. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~E3D4E1FC3F2916D3A687D5B77462ED62B189E778 102583~|~1~|~2~|~02/S<2~|~Work on US 68 in Hancock County from the Findlay Urban Area boundary at approximately 11.66 which is just before the ramp to 12.01. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~DFCBBF7D3B1DF628C47E73E7FBEF084579E20BC8 102583~|~1~|~3~|~03/NHS~|~Work on US 68 in Hancock County from 12.01 to the end of the project at 12.13. District Preservation Program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~8D5702C48171355397CF25030CA63F88AA45312C 105242~|~1~|~1~|~01/STR~|~Resurfacing SR 170~|~05 - 4R Maintenance - Resurfacing~|~E6A55773DFBA3E2392D7D6A9AAB3AB2232E95F60 120446~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~21ABB8CEFDA8E2BCB90226914C1DBA509FF79099 91775~|~1~|~1~|~01/NHS~|~Asphalt resurfacing on WAS US 50 0.00-4.96.~|~05 - 4R Maintenance - Resurfacing~|~71444287B4C5FDFAD512FBA8B1DE1EC139C13CD9 101439~|~1~|~1~|~01/NHS~|~NHS District Allocation - Major Rehab~|~04 - Reconstruction - No Added Capacity~|~A1C247F10F80050168E7576B73944C2741A04C34 101439~|~1~|~2~|~02/NHS~|~Bridge Work has been Determined.Preventive Maintenance:Bridge railing upgrade/repair (061)Deck Sealing (051)Reactive Maintenance:Exp jt repair/repl (048)~|~13 - Bridge Rehabilitation~|~4F867E9109436A6B2531315C210008C715B3B9F0 101439~|~1~|~3~|~03/SAF~|~intersection improvements~|~21 - Safety~|~EC7BC807AA973D96A2C8ECD1107F78DCC77028F9 107874~|~1~|~2~|~02/IMS~|~All concrete repair work on I-75 ramps at SR 613 and SR 12.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1B52A4C7AF1E6337DEE21265FC1B32E15DB429D8 107874~|~1~|~1~|~01/NHS~|~Concrete repair work on US 30. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~74D72593E06AE53B9D37F0F09869D193A9C751A5 91461~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 682 0.75-1.95 and 2.15-4.73. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~56A34BAC93C8197AC35505016ADD0EF75A35FE1B 91461~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 13 0.08-2.71, 4.52-8.51, and 11.79-11.92. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A8D3846F375DEEAEA1CF301E2338530B2804C199 91461~|~1~|~3~|~03/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. ATH 682 1.95-2.15 and 2.33-2.50 RT. Urban other federal aid in the City of Athens funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~AB78E36497EC4FD2E6FA3843CC16D10875129B37 91461~|~1~|~4~|~04/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 13 2.71-4.52 and MEG 33 1.12-1.20. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~AC2B8272929A5FC8D8436FC46D69A4DA656AD200 108284~|~1~|~1~|~01/NHS~|~Emergency repair project.BRO 52 15.20 BRO-001~|~04 - Reconstruction - No Added Capacity~|~6AC19C3728BC83C3ED6922EE33D58EEBA01F06E4 124170~|~1~|~1~|~01/SAF~|~Safety funded scope.~|~21 - Safety~|~2AB31987DD13A3A7478B9E26DEE86CD49BE01FF0 124170~|~1~|~2~|~02/MPO~|~TMACOG funded CRP funds, includes SUP on SR 65 (W Indiana Ave) at Ft Meigs Historic Site~|~28 - Facilities for Pedestrians & Bicycles~|~EEF58D4550DB6D0C604CA8E54BDF33635041EEF1 116898~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D03FC9163932A0928D912CE8C58AF1D60AA4403B 92266~|~1~|~1~|~01/S<2~|~Culvert Construction/Repair~|~04 - Reconstruction - No Added Capacity~|~19D49D7B124190BF1EDB29E15AEEB1582CF5787B 103077~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~AC5F813536E3301087A579054A6D91810BBA151D 100629~|~1~|~1~|~01/STR~|~1" Fine Graded Polymer asphalt overlay on CAR-39~|~05 - 4R Maintenance - Resurfacing~|~4F31F2C1B6042843732571D3CBE4D75C618AAD8D 120298~|~1~|~1~|~01/SAF~|~Portsmouth SRTS project~|~21 - Safety~|~96EF23F52FE8E58061B136A8524D969F21A4E1B4 118543~|~1~|~1~|~01/STR~|~Plan Split for STP Rural portion of project~|~05 - 4R Maintenance - Resurfacing~|~E412CF8CB8CC62C461A9C6FA75225864EC4C3198 126109~|~1~|~1~|~01/BRO~|~Plan split for bridge block PID~|~13 - Bridge Rehabilitation~|~D8BA2BBE85900C0DAFD4116D0B2FC4495FDECF00 91600~|~1~|~1~|~01/BRO~|~Replace bridge deck and paint structural steel. Limited approach work. SFN 5701597 MOT US 35 15.13 S~|~10 - Bridge Replacement~|~4A9FB31D7FCE1E2789B3F8C3D6DBE857FFA2E9A2 101895~|~1~|~1~|~01/S>2~|~SR-64 in Waterville.~|~04 - Reconstruction - No Added Capacity~|~84B38D103E0288D00E05B3D4BC8593DE8BF64B5C 101895~|~1~|~2~|~02/NFP~|~For items not eligible for urban paving and cost beyond cap.~|~~|~37BD61EB9858C7DFD452FBA90D3C9EEDD951F775 115561~|~1~|~1~|~01/S50~|~Resurfacing of SR 65 in the City of Lima. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~49DFC0A476C1C9DBE2C9E5E1FE08C39E9E1893D9 115561~|~1~|~3~|~03/S50~|~Work such as excavation and full depth pavement repair aimed at the reconstruction of Central Avenue. ~|~04 - Reconstruction - No Added Capacity~|~1BD915E49D8A97A33D67F518D6593825F6736105 115561~|~1~|~2~|~02/CMQ~|~Work that is aimed at bicycle and pedestrian facilities. This includes lighting, sidewalks, curbs, bike lanes, signage, and other incidental work needed to complete these items. ~|~28 - Facilities for Pedestrians & Bicycles~|~0D7CFAB275DB38C027E1660594C00C3F135F03C5 115561~|~1~|~4~|~04/NFP~|~100% City cost items for utility work such as waterline relocation.~|~43 - Utilities~|~84021A9C75C5E2B44B18FA26113378DC66DA94AC 94537~|~1~|~1~|~01/STR~|~80% federal / 20% state using Geologic Site Management funding.~|~~|~B5C6D0A8AD89824323B0662C1AE84ECB5A7C32E3 106153~|~1~|~1~|~01/STR~|~Landslide repair. MRG 37 9.01. DSR MRG-002. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~78381B3601788621BB5602C011908CDB228307D9 75089~|~1~|~1~|~01/NHS~|~Replace existing deck on bridges (TUS-250-1412 L & R, SFN 7904894, 7904924) with new reinforced concrete deck and convert abutments to semi-integral. The bridges carry US 250 over SR 416.~|~13 - Bridge Rehabilitation~|~30FD15660B7FC1F4EE165B2F4B8CA78760CDD9EC 100552~|~1~|~1~|~01/NHS~|~LAW 7/52 Sign MaintenanceUS 52 11.58-22.62SR 7 0.00-2.38 SR 7 6.36-6.44~|~44 - Other~|~B223BACE6CE92C052257BF24001E041C2214C765 100552~|~1~|~2~|~02/S<2~|~LAW 7 Sign Maintenance SR 7 2.30-6.36~|~44 - Other~|~492E4CA98B7F403CEB9CCF3A5ECD9FA1BF169163 95951~|~1~|~2~|~02/NFP~|~Traffic office renovation.~|~44 - Other~|~495DD6A9EF3D2CF9CCDCF42E8B34A7877FC0C7DC 95951~|~1~|~1~|~01/NFP~|~Traffic office renovation~|~~|~6BC5D332DE08FE61A60C560B0D02B848512097E9 114507~|~1~|~1~|~01/IMS~|~resurfacing a section of HAM-275~|~05 - 4R Maintenance - Resurfacing~|~C8A218C28F91F81930CE032893BD5E0F94FDAE0E 125965~|~1~|~1~|~01/BRO~|~Bridge Rehabilitation.~|~13 - Bridge Rehabilitation~|~43D191BEAC051BD1B6852BCDAB08337983DD6A5D 92368~|~1~|~2~|~02/NHS~|~Structure at OTT-53-5.18~|~13 - Bridge Rehabilitation~|~4F48E6E4D5145A22A8A0FAEAA944F87BAEBF96C3 92368~|~1~|~1~|~01/NHS~|~resurface OTT SR 53 0.00 - 4.98 - Sandusky County Line to Helendale~|~05 - 4R Maintenance - Resurfacing~|~C82C25526C49E0565F62EA9A2B0FF9614F37C72C 89192~|~1~|~1~|~01/MPO~|~Two roundabouts funded with TMACOG (MPO) CMAQ located at: LUC CR124 1.23-1.24 and LUC CR133 2.15-2.16~|~21 - Safety~|~30781CA68BC11591D5E37DA4E87B5FC9698DE565 124555~|~1~|~1~|~01/IMS~|~Deck rehabilitation of federally eligible bridge on the interstate.~|~13 - Bridge Rehabilitation~|~769A59C423E55696F8DD26EA65B14B6822C21693 119114~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0BA836613AC889D17651713F80F938F850FF1388 119114~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A5129C4A38192705C5C946F570B6FC524F133D42 119114~|~1~|~3~|~03/S>2~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~D32D598A5D70EB59A6D16CB5A7721E1F0FD9ABBD 119114~|~1~|~4~|~04/STR~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~5F8A1CD304DB07A5FF9EAE8435D98590AAA7580E 100330~|~1~|~2~|~02/NFA~|~Chip seal non-federal state route LOG SR 287 0.00 to 11.00~|~05 - 4R Maintenance - Resurfacing~|~A25CD75E61B2F77B42B924A778435816CA1BFFC8 100330~|~1~|~1~|~01/STR~|~Chip seal various routes in the District CHP SR 29 2.68 to 10.08 CHP SR 245 10.82 to 17.06 CHP SR 296 5.98 to 10.52 CHP SR 559 7.88 to 1138 CLA SR 41 0.00 to 3.63 CLA SR 54 6.01 to 10.06~|~05 - 4R Maintenance - Resurfacing~|~A3CE3F05F39AE53DBD5D4701440E63570523326F 92696~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7 (90% Federal)/4PS7 (10% State) - No CAP - Backwall repairs and approach slab work for 1) 4502884 Lic IR70 00.74L Intersect: over TR 36 Palmer Rd; 2) 4502914 Lic IR70 00.74R Intersect: over TR 36 Palmer Rd; 3) 2301598 Fai IR70 00.84R Intersect: Blacklick Creek; 4) 2301563 Fai IR70 00.84L Intersect: Blacklick Creek; 5) 2301628 Fai IR70 01.19L Intersect: over SR 256; 6) 2301652 Fai IR70 01.19R Intersect: over SR 256;~|~~|~96346BFB5E30529D8B511C001C571C493FB74AA3 124519~|~1~|~1~|~01/SAF/ASD~|~Pavement Marking of various Ashland County Roads.~|~~|~E2D477CE8CF6AB50AD04129DE860DBEB36AF7DC0 124519~|~1~|~2~|~02/STR/ASD~|~Pavement Marking of various Ashland County Roads~|~21 - Safety~|~7F30E527A56CF57364EC752F614CD0075357597B 91069~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~1436BC90AE361B9E361A65D9D8A194FFA1E15710 112977~|~1~|~1~|~01/S>2~|~Line the bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown.~|~13 - Bridge Rehabilitation~|~DF9EBF1A542256C24500945A6C79D6F320FF6A9C 104771~|~1~|~1~|~01/NFP~|~District wide crack sealing.~|~44 - Other~|~78A0B74813CA456F0D3ADFE405F8F60EF9C2777C 120731~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~~|~5B762CACFDE2FC3A2104374C08D31273E6630197 84853~|~1~|~1~|~01/ENH~|~Minor rehabilitation of pedestrain bridge HAM-71-0571. Project to include addition of ADA ramps, painting of structural steel, upgrade of fence and rail, and raise superstructure~|~13 - Bridge Rehabilitation~|~A32B6C4AACBE21979D664E9A0BEAC1062B8DB4B3 84853~|~2~|~2~|~02/IMS~|~Added repair as a second plan split.~|~13 - Bridge Rehabilitation~|~A81AB5E3681E8ACFB0DB6C956B10F636E848461E 112337~|~1~|~1~|~01/NFP~|~Reconstruction of the NB WAS 77 Rest Area parking lot. Funded 100% State.~|~28 - Facilities for Pedestrians & Bicycles~|~20CA628392F1EDA752B9F502396A4B079CAD3A04 105859~|~1~|~1~|~01/STR~|~See linked structure > 20' span.~|~~|~12A1C12CC17A1A410AC1CA6CE02B055B1600B403 92955~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " - ODOT Facilities - No CAP -Facilities' project to install sanitary sewer lines at the restarea on IR 77 in Guernsey County at the 00.36 mile marker north bound and 2.93 mile marker south bound.~|~07 - 4R Maintenance - Relocation~|~12428390A0606919477CC2C2EF5F76729CFD5AFE 123497~|~1~|~1~|~01/STR~|~Resurfacing for project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~FDBDCB4DFF83DC98F07D450C29627AAA58D68CFD 123497~|~1~|~2~|~02/NFA~|~Resurfacing for project using an asphalt overlay treatment.~|~17 - Construction Engineering~|~FC56ACF7272127BBBC00EA55E8AFAB3FBCC2BA79 97113~|~1~|~4~|~04/BRF/CCEO~|~"04/BRF/OT/CCEO" - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 1631608; Cos-TR 90-00.01 - BR Eligible for Replacement: Length = 45'; SD/FO = (1); SDR = 29.5; DR = "6"~|~10 - Bridge Replacement~|~33B7DA5DE82B2518EAB021AA16BA648DCA656D60 97113~|~1~|~2~|~02/BRF/MCEO~|~"02/BRF/OT/MCEO - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 6035639; Mus-CR 427-00.05 - BR Eligible for Replacement: Length = 26'; SD/FO = (1); SDR = 22.3; DR = 5~|~10 - Bridge Replacement~|~6977B0440240D000F7696E5ACC11032A3704E095 97113~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/OT/MCEO - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 6038174; Mus-CR 71-06.30 - BR Eligible for Replacement: Length = 60'; SD/FO = (1); SDR = 22.8; DR = 6~|~10 - Bridge Replacement~|~743DA0E286CDD7515F9ABFE99383C6CE64500EA2 97113~|~1~|~3~|~03/BRF/MCEO~|~"03/BRF/OT/MCEO - Ohio Bridge Partnership Program 7BP7 (100% Federal) - Bridge Replacement of SFN 6037461; Mus-TR 128-02.93 - BR Eligible for Replacement: Length = 86'; SD/FO = (1); SDR = 32.5; DR = 5~|~10 - Bridge Replacement~|~87CADEE206B0B82EE906D800B5B2E310EDA9A383 114164~|~1~|~1~|~01/SAF~|~Split for signal work at SR-175 & Cedar Rd~|~21 - Safety~|~06CDE586B587FD4F36D094C3B28727887CEF041F 93449~|~1~|~2~|~02/NHS~|~General system paving of FRA-161: 7.11-7.35, 7.38-7.48, 7.52-7.76, 7.92-8.67~|~05 - 4R Maintenance - Resurfacing~|~47788A90DBFF48C7738D0A6D5B54D4C1CFA1A55A 93449~|~1~|~1~|~01/NHS~|~Columbus urban paving of FRA-161: 5.76-7.11, 7.35-7.38, 7.48-7.52, 7.76-7.92~|~05 - 4R Maintenance - Resurfacing~|~C89BA2C4691068E57F177835AE4ED6E2D9C7619E 93497~|~1~|~1~|~01/IMS~|~90/10 Pvmt Reconst, No Added Capacity (84% of pvmt quantitites)~|~~|~A71523912F76617E00510FABC6B81F8F0E99F138 93497~|~1~|~2~|~02/NHS~|~80/20 Pvmt Reconst, Added Capacity (16% of pvmt quantitites - add 4th lane in median)~|~~|~1B6F6FCAB6C7770448CBE4EC6C3FB69546941289 93497~|~1~|~3~|~03/IMS~|~90/10 Rehab of 10-20' span structures, Reconst, No Added CapacityFRA-71-10.40 Brown RunFRA-71-12.34 Rancid Ditch~|~~|~B742F8AC827811E9A3A788D9BAAE3C93B371096C 93497~|~1~|~5~|~05/NHS~|~80/20 >20' span structures, Bridge Rehab, Added Capacity (16% of quantities)FRa-71-10.48L 270 Ramp AFRA-71-10.48R 270 Ramp AFRA-71-10.65L 270FRA-71-10.65R 270FRA-71-11.74L Big Run CkFRA-71-11.74R Big Run Ck~|~~|~C9238C4586F9CC1D1910B344C36D50D896F599E4 93497~|~1~|~4~|~04/IMS~|~90/10 >20' span structures, Bridge Rehab, No Added Capacity (84% of quantities)FRA-71-10.48L 270 Ramp AFRA-71-10.48R 270 Ramp AFRA-71-10.65L 270FRA-71-10.65R 270FRA-71-11.74L Big Run CkFRA-71-11.74R Big Run Ck~|~~|~708C3C87ED61916213C56F148136BB4DBB930352 93497~|~1~|~6~|~06/IMS~|~90/10 >20' span structures, Bridge Replacement, No Added Capacity (84% of quantities)FRA-71-12.79L Frank RdFRA-71-12.79R Frank RdFRA-71-14.36L Greenlawn AveFRA-71-14.36R Greenlawn Ave~|~~|~59A13F558CC4435E29A58CE2962043F8AFCF66DD 93497~|~1~|~7~|~07/NHS~|~80/20 >20' span structures, Bridge Replacement, Added Capacity (16% of quantities)FRA-71-12.79L Frank RdFRA-71-12.79R Frank RdFRA-71-14.36L Greenlawn AveFRA-71-14.36R Greenlawn Ave~|~~|~C5F54C9D1C46F4BD7DFA0F33CDF370F30C3AEAE6 93497~|~1~|~8~|~08/IMS~|~90/10 Project eligible utility cost - power pole relocation~|~~|~CD31B08DC3DED4D284F2D783D2E85B1B1D8435C3 102642~|~1~|~1~|~01/STR~|~D10 Chip Seal FY 2025 North. WAS-339-21.38-24.77.~|~05 - 4R Maintenance - Resurfacing~|~F4DEB94C23BD7338BBB35C813626E5A5CDFFE5C2 102642~|~1~|~2~|~02/NFA~|~D10 Chip Seal FY 2025 North: Noble SR 147-0.00-2.60.~|~05 - 4R Maintenance - Resurfacing~|~802A8285D8F6CE4F2EBFF1843E2F7086A0B78DC1 98232~|~1~|~2~|~02/NHS~|~Bridge Rehab Interstate - Widening - FRA-70-23.74 (SFN 2505681)-18%~|~13 - Bridge Rehabilitation~|~4E01BB21CE8697DDD420F543EC0C653062CDEE72 98232~|~1~|~3~|~03/IMS~|~Resurfacing of ex IR-70 WB from E of Brice Rd to W of I-270. Resurfacing of ex IR-270NB. Work to include the replacement of ex storm sewer, ex underdrains, ex RW fence, traffic control, lighting, ITS and other ancillary items.~|~04 - Reconstruction - No Added Capacity~|~58A734DD0389C66925DC52772302D3358A5F2F69 98232~|~1~|~1~|~01/NHS~|~Widening of IR-70 WB from E of Brice Rd to W of I-270 including CD lane. Extension of ex culvert (CFN 1825905). Work to include Retaining walls, Noise Walls, Proposed Storm Sewer and other ancillary items. ~|~03 - Reconstruction - Added Capacity~|~7766E92AE0FF1C0F27E49D5123A8F5AC5205C48A 98232~|~1~|~4~|~04/IMS~|~Bridge Rehab Interstate - Existing Width - FRA-70-23.74 (SFN 2505681)-82%~|~13 - Bridge Rehabilitation~|~3651D4F1B519280A4570A73218EC33E967547AD4 98232~|~1~|~5~|~05/S>2~|~Bridge Rehab - FRA-BPFRW-41.060 (SFN 2564106)-100%~|~04 - Reconstruction - No Added Capacity~|~9041A30B7A3E6819A510AB02DAEB2385DFBE1C5E 98232~|~1~|~7~|~07/IMS~|~FRA-70-23.92 (SFN 2505742)- New Brice Rd Structure over IR 70 WB-CD ~|~08 - Bridge - New Construction~|~7B1C4000EE5A826CABAF62445AAEE86400EDAA2D 98232~|~1~|~8~|~08/IMS~|~Bridge Replacement - Existing Width - FRA-70-23.92 (SFN 2505738)-60%~|~10 - Bridge Replacement~|~2206729CA4162F25D435D32A67250A4983D72F00 98232~|~1~|~9~|~09/NHS~|~Bridge Replacement - Widening - FRA-70-23.92 (SFN 2505738)- 40%~|~10 - Bridge Replacement~|~2429E473B3CB5B773CE33CA8A12B0613EDB30FE1 98232~|~1~|~6~|~06/S>2~|~Items of work due to Interchange reconfiguration and widening. Widening/Resurfacing of Lake Club (MR-1183), Tussing (MR-4374), Brice (CR-117) and Chatford DR. Culvert Extension of 84" under Brice Rd. Culvert Replacement under Chatford Dr. due to widening of I-70. Work to include waterline work, storm sewer, underdrains, traffic control and other ancillary items.~|~03 - Reconstruction - Added Capacity~|~1F55770B905D5D90984DC457FCACD22C122CA4CD 98232~|~1~|~10~|~10/IMS~|~Repair damage from vehicle accidents~|~03 - Reconstruction - Added Capacity~|~8FE6435FA62163F2551E4425EE09790C49CF8B08 123526~|~1~|~1~|~01/S>2~|~CEAO Local Bridge Program funding for HAM CR374 Newton Rd Bridge Rehab~|~47 - Bridge Preventive Maintenance~|~A4FB0C740CACB00A31ED74C33B7CF2520531C4C8 85401~|~1~|~1~|~01/NHS~|~80/20 funding split for work that is eligible for federal urban paving funds~|~05 - 4R Maintenance - Resurfacing~|~5DC9976E3AFDEE7D4C0454F66AA1FB5C3C4C190B 85401~|~1~|~2~|~02/NFP~|~Pavement work not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~1D61B038B34BA7025ECBFB8D20AEDF8E074341ED 112906~|~1~|~1~|~01/IMS~|~MRW-71 from 19.53 to 19.92~|~05 - 4R Maintenance - Resurfacing~|~F1845352B21A225C009A6077A97A205B08B513BA 112906~|~1~|~2~|~02/STR~|~MRW-61 from 8.84 to 13.18 and 14.83 to 20.51. MRW-97 from 2.46 to 3.68. MRW-42 from 4.94 to 6.86.~|~05 - 4R Maintenance - Resurfacing~|~1F6E34E2909AABEB23B4619AB445AE50C841CAFC 118539~|~1~|~1~|~01/BRF~|~Plan Split for Municipal Bridge Program funds~|~10 - Bridge Replacement~|~6CF750140702E8CBFD6037BBED5E477052809369 119898~|~1~|~1~|~01/NFA~|~NEVI Round 2 15-A~|~63 - Electric Vehicles & Charging Infrastructure~|~EB11775EBC39C10368382972408962B66CCEC3FF 99492~|~1~|~1~|~01/NFP~|~Mowing contract~|~44 - Other~|~8003CD89604347DD9C4768043AD9E5E1DC4FD4A1 91877~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No CAP - Mus-SR 93 from 07.16 to the 15.02 - Treatment is 10% Surface Repair, 1" Mill and 3" Asphalt Overlay~|~05 - 4R Maintenance - Resurfacing~|~8FDB23FF91A58879F918B0F7DE970D85708A9A8B 113333~|~1~|~1~|~01/NFP~|~District Maintenance Funds - 4CP7 (100% State - No CAP - Project to repair and replace damaged Guardrail District Wide~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7F8ACECDFA68C5715B752F32E87EDE96C69D85DE 110135~|~1~|~1~|~01/S5K~|~Small Urban section of PRE-122 ~|~05 - 4R Maintenance - Resurfacing~|~02CF40E95B934C4FEB6A0F3B4882D76D9231AA0D 110135~|~1~|~2~|~02/STR~|~Resurfacing on the Rural portion of the project PRE-122~|~05 - 4R Maintenance - Resurfacing~|~CDEA0594C2D3636AC4A2D02C7F301B42614F9E3E 114714~|~1~|~1~|~01/NHS~|~Overlay~|~05 - 4R Maintenance - Resurfacing~|~95F0D5B737F6BBF3FC2E9A0B9E99BC333F610BB0 100321~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay of MAH SR 534 from 4.48 to 8.49, POR SR 88 from 12.63 to 13.70, POR SR 303 from 13.74 to 17.77.~|~05 - 4R Maintenance - Resurfacing~|~21B88160E3A02C1D8A3618568A29F3B8745E358B 100321~|~1~|~2~|~02/S<2~|~Fine graded polymer AC Overlay of POR SR 88 from 11.13 to 12.63.~|~05 - 4R Maintenance - Resurfacing~|~E91722501FB690EC59654903D84C9461B50589B2 115714~|~1~|~1~|~01/NFP~|~Established CO CC 1 - District Preservation Funds - 100% State (4PS7)~|~21 - Safety~|~CCEB5C82CD7E6B8731E485E3A219C1261FE6BF07 98689~|~1~|~1~|~01/NHS~|~Construction of connector between Duck Creek Road and Madison Road at MedPace Drive.~|~01 - New Construction~|~BCD3B63A658B8D58297E94B81434EE03A84EDE76 107317~|~1~|~2~|~02/NFP~|~Split for ding & dent repair work~|~21 - Safety~|~95A8F91B1B364648B0FFF78D0342FEA62158D94C 107317~|~1~|~1~|~01/NHS~|~Split for guardrail upgrading~|~21 - Safety~|~32A3A6B0167C974479332CBB5AEF4D9D2EF0A449 107317~|~1~|~3~|~03/IMS~|~Guardrail work on interstate~|~21 - Safety~|~85F6560FB8C63EEEA178047CDC9E7EE227E956CD 110563~|~1~|~1~|~01/IMS~|~Replace Bridge HAM-74-1335 (Race Road over I-74). Raise profile as necessary.~|~10 - Bridge Replacement~|~DFC80AC0B9C558A4EC786373D2B3866B66933FE7 109139~|~1~|~1~|~01/NHS~|~Bridge deck replacement project. MEG 7 7.59 L (SFN 5300150) and R (SFN 5300169).~|~13 - Bridge Rehabilitation~|~7044F37CCBD76584B807C8E6D2C970A307432501 119841~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~~|~B0E3FB113AD7FB721F97B128973E39A08EE5A4F7 118708~|~1~|~1~|~01/S>2~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~5AA697FCF8224884E2DE72168300C8BB1A925475 118708~|~1~|~2~|~02/STR~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~60129EA002271D4F838095371FF32B7745024D17 102821~|~1~|~1~|~01/S<2~|~STP<2 Pavement US 127 4.09-5.71~|~05 - 4R Maintenance - Resurfacing~|~2C428195EB425EC0E03E7889B6A4CE42EFFD5007 102821~|~1~|~2~|~02/STR~|~STP rural pavement~|~05 - 4R Maintenance - Resurfacing~|~08CCD3DFC61B69EFA450DB933D8EFCC56029C095 102821~|~1~|~3~|~03/STR~|~STP rural bridge~|~13 - Bridge Rehabilitation~|~FC1C2E219F45A7AEF6AAB05889B3722E6933EC8C 107499~|~1~|~1~|~01/STR~|~Resurfacing HAS-519~|~05 - 4R Maintenance - Resurfacing~|~FAC6D867FEBA14830AA2BC456BBDDD61357C51D9 107499~|~1~|~2~|~02/NFA~|~Chip sealing access roads along IR 77.~|~05 - 4R Maintenance - Resurfacing~|~1BB2AC512862F93197CE288FBF1BEDB3D2385FA2 87091~|~1~|~2~|~02/S>2~|~Split to include all work associated with bridges CLE-28-0258, CLE-28-0310, CLE-28-0341, and CLE-28-0364.~|~13 - Bridge Rehabilitation~|~7D68470DA80E1D4BDAB646097794D62CCE507C6E 87091~|~1~|~1~|~01/S>2~|~Resurfacing a portion of SR 28 in Clermont County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9D308F4D75595AF7041DB66DE56E9F4E61574C39 116115~|~1~|~1~|~01/STR~|~Resurfacing outside the Marysville Urban Area. CR 1-3.260 to 7.598.~|~05 - 4R Maintenance - Resurfacing~|~F2CB1323D8E4B8F91D2D89293F3C2002D55B8F64 115003~|~1~|~2~|~02/S>2~|~Pedestrian Improvements~|~28 - Facilities for Pedestrians & Bicycles~|~FF0939254AF3A92151DD4A867C68615190818CFD 115003~|~1~|~3~|~03/SAF~|~HSIP funded - Signal replacement and related intersection improvements at Woodman and Eastman~|~21 - Safety~|~8C6AA8F06160F4A65DF95BE15128852988383B6E 115003~|~1~|~1~|~01/NHS~|~Roadway full depth reconstruction including storm sewer and aggregate base. The project will also include the installation and replacement of sidewalks.~|~04 - Reconstruction - No Added Capacity~|~E7D7DF4482B0B14AF3C938E07A4667325E381856 115003~|~1~|~4~|~04/NFP~|~Unused Material~|~44 - Other~|~CF97DA1FF2351498EE0F3BD28DD740FFA2E009D3 101350~|~1~|~1~|~01/IMS~|~Bridge painting.~|~44 - Other~|~FBA7CAC88E528FBEA55F09C926960D438413A200 88875~|~1~|~1~|~01/STR~|~District Allocation~|~10 - Bridge Replacement~|~090EA874A6BF98592CB10980CF094296F6E2A441 95663~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment from the village limits of Malta to the village limits of Stockport. MRG CR 2 3.70-12.86. Work also includes pavement markings and RPM's. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~D3DECF230EEC50295293C06207668F6F6DD22887 93084~|~1~|~1~|~01/NFA~|~Rehabilitation of MOE CR 26 0.00-1.63. Work includes road bed stabilization, new base and new asphalt pavement. ODOD 629 funds, 100% State; ARC funds, 80% Federal/20% State; Jobs and Commerce funds, 100% State; Private funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D9B61320CD390EB7EBBCBD132EA448903319AE17 117258~|~1~|~1~|~01/SAF~|~Provide wrong way detection at several interchanges~|~21 - Safety~|~6EFB5474A98231EAFE4E6D14EE06EDEDBFDC8661 122169~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~234E395D791F8F5FFA936E09DA8132C40A897801 88133~|~1~|~2~|~02/IMS~|~Bridge Split~|~~|~49485F618B8D80ACE354547F7AB17D12D35FCA41 88133~|~1~|~1~|~01/IMS~|~add fourth lane and auxiliary lane for northbound between galbraith and shepherd~|~~|~AC0CA8DCBD71CECCDC23DB0C810E333715751EAF 88133~|~1~|~3~|~03/IMS~|~Rehabilitation of pavement as part of the widening of I75 from Galbraith to Shepherd northbound only, for an additional lane with auxiliary lane~|~~|~59DB018A96B046DA17458A322CD9468D68989D41 102743~|~1~|~1~|~01/NHS/CANT~|~Resurfacing, urban paving in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~70309BF9EC34F5E19B249A2850999D843FEE2FEA 102743~|~1~|~3~|~03/S>2/CANT~|~Resurfacing, urban paving city of Canton.~|~05 - 4R Maintenance - Resurfacing~|~30B4D67509BE7A7A9818C02F8FAB55FF38AE2405 102743~|~1~|~2~|~02/NHS/CANT~|~Full and partial depth repairs and ADA curb ramps where needed.~|~04 - Reconstruction - No Added Capacity~|~468A2E4ABEB2E4A6BFEBF37C1E3106CDF8629BC9 104092~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Athens County. CEAO funded. Funded 100% federal.~|~21 - Safety~|~3D38575654EAAB352C9F772BE7D1C716F2566C74 95556~|~1~|~3~|~03/NFP~|~100% local participation for work items such as VCP material cost and decorative artwork.~|~44 - Other~|~7BFF722E88E68A41325EC906840F4F1616CA0DE0 95556~|~1~|~1~|~01/MPO~|~80/20 federal/local split using MPO STP (SAC 4TA7) to resurface E. 22nd Street from Orange Avenue to Euclid Avenue.~|~05 - 4R Maintenance - Resurfacing~|~A49988194717C30ADB79ABA611F12F3F2A2D6D55 95556~|~1~|~2~|~02/ENH~|~80/20 federal/local funding split using MPO enhancement funding for streetscaping.~|~05 - 4R Maintenance - Resurfacing~|~FDE22D00C39361A54AB58B645146AB28FD76D460 89487~|~1~|~1~|~01/S>2~|~Geotechnical funding for Retaining Wall~|~44 - Other~|~2156662669BEE74EE55139F4828D10D05781021A 89400~|~1~|~1~|~01/STR~|~On SR327, 0.05 mile south of Woodrow Hole Road (SLM 19.50 to 19.57), it is proposed to cut back an existing rock face along the east side of the roadway. 80/20 split 01/STR/OT/State~|~21 - Safety~|~0AE38E3EF9CC0D3FEEB6650C56AADD8A88A633CF 104997~|~1~|~1~|~01/NFP~|~District Preservation Other Funding - 4PS7 (100% State) - No CAP - Annual RPM Replacement Project~|~21 - Safety~|~CAF44265E343019CC472B820106722E3ACC35508 102906~|~1~|~1~|~01/MPO~|~Resurfacing of Center Street in the City of New Franklin.~|~05 - 4R Maintenance - Resurfacing~|~4DAF6445D01908DFFFA793B30A2FEC626B36C457 126007~|~1~|~1~|~01/STR~|~Bridge replacement of MRW-TR122-0.55~|~10 - Bridge Replacement~|~6D047C805E184C8B5F3DF1B921CA66F61CEAD4EE 99500~|~1~|~2~|~02/NFA/KCEO~|~Knox County CEAO Minor Collector Resurfacing project - 4B77 (Federal 80%) / LNTP (Local 20%) - See CAP Comments - Resurfacing on Kno-CR 21-00.00 to 00.33~|~05 - 4R Maintenance - Resurfacing~|~11E373548B5671624591E5206EDF8B1E6BE41A67 99500~|~1~|~1~|~01/STR/KCEO~|~ Knox County CEAO Resurfacing project - 4B77 (Federal 80%) / LNTP (Local 20%) - See CAP Comments - Resurfacing on Kno-CR 21-00.33 to 01.57~|~05 - 4R Maintenance - Resurfacing~|~EF065EE9BC9BFB4B8C52DDD7F3C7226E6AC34FCD 83844~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 124 29.62-36.88. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~6AB4AB012954E8F9606C5DBD5469E8472C4D5BE0 83844~|~1~|~2~|~02/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 33 28.68-28.79. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~F42C9021BB9CF74DFD31198F0AAD1FC0416707FC 88281~|~1~|~1~|~01/SAF/SoP~|~LAW South Point SRTS Project - Safe Routes to SchoolIn the Village of South Point, it is proposed to construct sidewalks, curb ramps, school zone signage, and pavement markings along the perimeter of the new elementary school along Park, High, Seventh, and Washington. 100% Fed ~|~28 - Facilities for Pedestrians & Bicycles~|~AD13570A27D421C2BA295D7897EAC78FEAC0B428 92445~|~1~|~1~|~01/NHS~|~Federal funds and state funds from the ODOT Central Office Geologic Site Management (GSM) program. Funds over the GSM cap will be provided by the District using District Preservation Program funds. No local funds. Not in the City. 80% SAC 4SF7 and 20% SAC 4SS7 for the GSM funds and 80% SAC 4PF7 and 20% SAC 4PS7 for the District funds.~|~44 - Other~|~A27641C5CC3295AE82EADF168854252224FBBE60 116563~|~1~|~1~|~01/S50~|~Plan Split for bridge work~|~~|~05A6FC95FAAD251E0191947DECF9793B9EA97F4C 107604~|~1~|~1~|~01/STR~|~SFN 6202071. Span length 17 feet~|~04 - Reconstruction - No Added Capacity~|~FD41F91008354F21AD34CCBB05B95F358A7E7CFD 96965~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~9DA70C51C7DDE5DE55AEE02B734EBCFDC33614D2 93832~|~1~|~1~|~01/STR~|~Brdg replacementProject Termini: On SR134, located 1 mile north of SR286. Project Description: It is proposed to replace the structure, SFN 3602400. 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~EB29488A8EEA1F8A3C5335FB102AC57D77696DB4 106250~|~1~|~1~|~01/NFA~|~The LEDC will construct a two lane rd in the Point Industrial Park between Commerce Dr and Eisenhower Rd to support heavy manufacturing development.~|~01 - New Construction~|~69C9CCCA734A1559429BB05362160B25D1840D95 92122~|~1~|~1~|~01/IMS~|~resurface WOO IR 75 26.02-30.69 - SR-199 to Glenwood~|~05 - 4R Maintenance - Resurfacing~|~C346885A5C3C92CBF959F4E789A2B662539D463C 102890~|~1~|~2~|~02/NHS~|~Invert PavingJAC 35 2.48 4000056JAC 35 14.79 4000544~|~04 - Reconstruction - No Added Capacity~|~431352ABA938311F2B9EE96A77666BA8BEEBB286 102890~|~1~|~1~|~01/STR~|~Invert PavingADA 125 6.33 0103039HIG 50 22.32 3600904HIG 62 6.82 3601102HIG 753 10.45 3604233LAW 775 6.17 4404513LAW 775 8.40 4404602~|~04 - Reconstruction - No Added Capacity~|~BF93D07C75D3A6084B95AF9B432E85D0907B4D3B 102890~|~1~|~4~|~04/S<2~|~Invert PavingROS 41 14.48 1846211~|~04 - Reconstruction - No Added Capacity~|~B3E3D76B600AC246DD7A279F95B29BB7E393D2BC 102890~|~1~|~3~|~03/STR~|~Invert PavingADA 41 32.24 1878662ADA 125 18.37 1880350ADA 247 18.19 1876138HIG 62 23.43 1812751HIG 72 1.00 1804553ROS 41 14.02 1846208~|~04 - Reconstruction - No Added Capacity~|~BCDB516F0D79D0B2BCD35362BE4D404BD97920AC 85153~|~1~|~1~|~01/BRO~|~Plan Split SFN 7832621 TRU Hubbard Thomas Road over Little Yankee Run~|~10 - Bridge Replacement~|~5BA3026F19B7A07F6CADBA87BB4982F7B1EED0AC 87353~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~B69634FDDCF3A45515C6608B0EB79FBC7749C20F 101309~|~1~|~1~|~01/S>2~|~Plan Split for the non-NHS portion on HAM-50 between SLM 30.28-34.14~|~05 - 4R Maintenance - Resurfacing~|~14B61BC4D80934812D93A7BF9995A4C980E7509C 101309~|~1~|~2~|~02/SAF~|~Mid-block pedestrian crossing.~|~21 - Safety~|~F1D61A4DB3E4AC1651B081B94A2C6A212571FA49 113744~|~1~|~3~|~03/NHS~|~All items associated with Bridge work.~|~13 - Bridge Rehabilitation~|~38D6C3C007DBAF010D60165EC08385125FA80E9B 113744~|~1~|~1~|~01/NHS~|~Reconfigure the interchange of US 33/James Rd/Winchester Pike and add RCUT at US 33 and Petzinger Rd. Provide U-turn at Schaff Rd. All full depth pavement replacement areas and all items of work associated with the reconfiguration of the interchange and the full depth replacement areas.~|~21 - Safety~|~D8BDF4BE91796BED153B065ABB82496AB231ABC3 113744~|~1~|~2~|~02/NHS~|~Resurfacing of pavement adjacent to Safety work - US 33 on the east end of the project, James Rd, Ramp B and Ramp BB.It also includes minor pavement repairs, guardrail upgrades and other miscellaneous items of work.~|~05 - 4R Maintenance - Resurfacing~|~FFE305AD8DE91C8FF8179E48E5F6CA4B26A697B1 76980~|~1~|~1~|~01/IMS~|~Resurfacing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C5E58130B3900E9E47B345A646851880595A49A2 91822~|~1~|~1~|~01/NHS~|~Priority System concrete pavement rehabilitation on JEF-22-14.96 to 16.44 and JEF-7-17.62 to 17.99 and 18.90 to 19.21; 3.25" asphalt resurfacing including pavement repairs, lighting, guardrail replacement, and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~D35337C4AEE54659102C8785E099998B51FC5E93 125900~|~1~|~1~|~01/NHS~|~establish pro rata percent~|~44 - Other~|~86768C12AD4B97FFD74A225036D9174F05A9260A 96606~|~1~|~1~|~01/NHS~|~The project is programmed to rehabilitate bridge BEL-7-0099 (SFN 0700061) by replacing the existing reinforced concrete deck with a new reinforced concrete deck to be made composite with the existing beams. The existing beams will be painted. All bearings will be replaced with elastomeric bearings and the substructure units will be repaired.~|~13 - Bridge Rehabilitation~|~0178719A5A012FAF406F62262355B606A4A85E13 121897~|~1~|~1~|~01/SAF~|~Construct sidewalk, ADA curb ramps, and a pedestrian crossing on Cottonville Rd (TR-77) from Greeneview High School to Greeneview Middle School in the Village of Jamestown.~|~28 - Facilities for Pedestrians & Bicycles~|~B5A7B21E948797245B03FEC8A362C74F0E741BF9 103269~|~1~|~1~|~01/SAF~|~District wide Raised Pavement Markers.~|~21 - Safety~|~60A520F2AC019B58803009BCE07075154205244B 123826~|~1~|~1~|~01/STR~|~Plan Split for STP Rural~|~04 - Reconstruction - No Added Capacity~|~323308D9225FB5BFAC7BA15033B9FA86FF8F32FD 123826~|~1~|~2~|~02/NHS~|~NHS Funding Split~|~04 - Reconstruction - No Added Capacity~|~F2F3B2C1D2EA895702484E410B8DB8F21B4C78B4 123826~|~1~|~3~|~03/NFA~|~Plan split for Not on Federal Aid System~|~04 - Reconstruction - No Added Capacity~|~DBD9D6F23AC08A8FFAEC3628491DC15EEF26026B 115403~|~1~|~1~|~01/NFA~|~Plan split for federally eligible items in construciton/CE~|~28 - Facilities for Pedestrians & Bicycles~|~E106933635AA026D55FE55273CF0ECDB786E80DC 103941~|~1~|~1~|~01/SAF~|~Re-striping the intersection of Wooster and Hopocan.~|~~|~11F63A37771AF3A96A282A98864CDBF8B6C00F37 91971~|~1~|~1~|~01/STR~|~BRO 125 11.86-22.93BRO 774 3.22-10.93~|~05 - 4R Maintenance - Resurfacing~|~AF8B15D1C45A5B5A242E542FB062095EC58A74C8 91971~|~1~|~2~|~02/STR~|~BRO SR 125 & SR774 0802336 BRO SR125 12.340802417 BRO SR125 18.110802441 BRO SR125 18.220804258 BRO SR774 6.43 0804290 BRO SR774 10.5 80/20 split~|~13 - Bridge Rehabilitation~|~818CEC51DF4F08231120E383324739BB3EEAF665 94556~|~1~|~2~|~02/S>2~|~Pavement, planning and resurfacing SR 48 from 4.44 to 4.48 within Washington Township~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9D12EC2421AC2C38B1AD7969CDC0FD260E85D6C8 94556~|~1~|~1~|~01/S>2~|~Pavement, planing and resurfacing with asphalt concrete on SR 48 from 3.26 to 4.44~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~04B69F5AD68B2BAB9C96A02FB5C56585C968578E 126016~|~1~|~1~|~01/IMS~|~plan split for the work on the WAR IR 71 9.81 bridge size culvert~|~66 - Resilience Improvement - Highway Project ~|~6D8B173A79DEFAFC3231B18FDC015FAA815C8C3B 117307~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 147 over Dog Hollow.~|~04 - Reconstruction - No Added Capacity~|~44623E9AF6B3A500B709E048BEB3C95FD42136AA 109678~|~1~|~1~|~01/STR~|~AC Overly with Repairs on: CLI-350 SLM 4.20 to 7.91~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~162A080EC9D67604CDD42AF2AC45382D6995FCA7 109678~|~1~|~2~|~02/SAF~|~Centerline rumble stripes.~|~21 - Safety~|~FDFD5CB61C0C1D636ABB80AED08770399176AFAC 90989~|~1~|~1~|~01/S>2~|~Extension of Cosgray Road~|~01 - New Construction~|~B4690F0CF303031CF9B4080DDE0900B090A244DD 96316~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5FFA7182826A4076EE0E21B0F75E9E9C91712ADC 96316~|~1~|~2~|~02/STR~|~Bridge Work: WAY-94-1.80 / WAY-94-4.66~|~13 - Bridge Rehabilitation~|~02FF7D06D3622233113471696EE630570D18E503 118472~|~1~|~1~|~01/MPO/HARR~|~Split for non-bridge related reconstruction costs (widening the I-74 off ramps, adding ramp meters, reconstructing traffic signals).~|~04 - Reconstruction - No Added Capacity~|~60F8C491E177C7346CB3768177BE1068AE9C39DB 118472~|~1~|~2~|~02/BRO/HARR~|~Plan split for the bridge widening work to add left turn lanes from Dry Fork Road onto the I-74 on ramps and addition of sidewalk on the bridge.~|~13 - Bridge Rehabilitation~|~F8BF62D08C6D98F6D33215E2D73B41F0BD9CF7A5 118472~|~1~|~3~|~03/SAF/HARR~|~Plan split for TSMO funds that are being used for traffic signal reconstruction at the intersection of Dry Fork Road with the I-74 ramps.~|~21 - Safety~|~D228AA213D9CA805CA0FC1970479FB0E463BD957 96785~|~1~|~1~|~01/SAF~|~Guardrail installation/replacement project on various routes and sections in Gallia Co. CEAO funded using HSIP. Funded 100% safety.~|~21 - Safety~|~666FDE66F8F5B63DF8C0DFA9C9BCD8F29589714A 90217~|~1~|~2~|~02/MPO~|~This split is for work that is not under the CMAQ split. MPO-STP funds are used in this split.~|~04 - Reconstruction - No Added Capacity~|~84BD32E70E69C926D746FD83D1D1815793F7E298 90217~|~1~|~1~|~01/CMQ~|~This split is for work elibible for CMAQ funds. The CMAQ eligibility was approved in an April 14, 2014 letter.~|~28 - Facilities for Pedestrians & Bicycles~|~944EE0CB2B374C4C9A490475663A93E6E397561A 106224~|~1~|~1~|~01/CMQ~|~Intersection Improvement in the City of Franklin.~|~04 - Reconstruction - No Added Capacity~|~913D7F51EBEBADC7E6B07F75CDBCF3BC6B4DE6F0 106224~|~2~|~2~|~02/BRF~|~Split for the cost to replace SFN 8360545, required as part of realigning Beal Road at SR-123.~|~10 - Bridge Replacement~|~A64137526FC7AD0C8D5D2195F865974D9DED3610 114315~|~1~|~1~|~01/NFP~|~Established Plan Split 1 - "01/STR/OT/ "~|~21 - Safety~|~4D8F9B55BF590F9693B80160B71208B00ED90820 112908~|~1~|~1~|~01/NFA~|~ADA 137 0.00-3.56~|~05 - 4R Maintenance - Resurfacing~|~49C64E908F604629E00ABF8383FDE418B8621F4D 112908~|~1~|~2~|~02/STR~|~ADA 247 7.41-17.12~|~05 - 4R Maintenance - Resurfacing~|~93863AFABF8BAEA35292DEE5BC0020635742E901 112908~|~1~|~3~|~03/NFA~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~87D8C527FCE6621726F30A83D153DF191DC6F9CC 112908~|~1~|~4~|~04/STR~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~413CD9DFD950CC2C2F7D1A4452B79D485D0D617B 112908~|~1~|~5~|~05/NFA~|~ADA ODNR Tranquility Wildlife Area~|~04 - Reconstruction - No Added Capacity~|~88931F1169EEAAAE96275736EFCC3D863D7E7D1A 112908~|~1~|~6~|~06/NFP~|~Plan split for material buyback.~|~~|~524946B0A32BE2783DFA16CF636535CFEE091378 86700~|~1~|~1~|~01/NHS~|~NHS: ASD 250 6.34-8.46, CRA 30 4.07-9.74, ERI 101 6.13-7.15, HUR 20 8.56-10.76, LOR 18 1.65-3.30 and 11.44-13.96~|~99 - State Preventative Maintenance~|~9BA509B8C9D11B1CE6FDF146C7F16422DECEB953 86700~|~1~|~3~|~03/S<2~|~STP < 200000: ERI 101 3.86-6.13, LOR 57 12.19-12.93~|~99 - State Preventative Maintenance~|~9F76DBF265379531380234A8CBEEA0770EEA427F 86700~|~1~|~2~|~02/STR~|~STP Rural: MED 83 0.94-3.46, WAY 83 16.30-25.03~|~99 - State Preventative Maintenance~|~B598A0261B0C37A971E0EC566F792DE3DDC710AE 86700~|~1~|~4~|~04/S>2~|~STP > 200000: LOR 83 10.61-10.97 and 11.76-12.50, LOR 83C 0.00-0.28.~|~99 - State Preventative Maintenance~|~C1A298474068A432F68499E44BFFC84E80AE59CD 114914~|~1~|~1~|~01/NFP~|~Crack Seal plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AF0A9C4A7FBB0057BA3A83F406D8BA568471E7FE 106538~|~1~|~1~|~01/BRF~|~JAC TR 973 0.08 (SFN 4031105)~|~10 - Bridge Replacement~|~0A6D566EE259AF91B5741E6C06D90C9D98171D5B 121241~|~1~|~1~|~01/S5K~|~Preble County signs~|~21 - Safety~|~779EF1ACDDB98561EBF30422D406D90FD24E24F3 105371~|~1~|~1~|~01/STR~|~Microsurface on rural routes: MER SR 49 SLM 13.91 to 21.45 & MER SR 118 SLM 17.98 to 23.76~|~05 - 4R Maintenance - Resurfacing~|~7341570FAA66FF0BE9D7E1BEA65C8971AFE87290 114382~|~1~|~1~|~01/NHS~|~Rehabilitate bridge carrying pedestrian traffic over SR 7 by replacing the superstructure and pedestrian access on east side of bridge.~|~13 - Bridge Rehabilitation~|~956F0AB091F47B321E6A2F5C12984AE88F7C0C04 112753~|~1~|~1~|~01/MPO~|~Resurfacing Norton Ave from Cleveland-Massillon Rd to Norton East Corp Limit.~|~05 - 4R Maintenance - Resurfacing~|~D8EE6A7D26B84C059C867B530659D1B553444D47 117984~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~B51E3F66DBE27690A1AD36DE52BCA96C5DAD08FE 109036~|~1~|~1~|~01/NHS~|~Sign Replacement.~|~21 - Safety~|~095184BE5CAD1F84E704850324FC40E4211F6EC8 14198~|~1~|~1~|~01/IMS~|~Funding for the painting of structural steel.~|~47 - Bridge Preventive Maintenance~|~5AD6ABDB2311C36557AFF20DE5917EC7FBA51E74 122224~|~1~|~1~|~01/STR~|~Conduit extension and headwall replacements.~|~04 - Reconstruction - No Added Capacity~|~0E4B8BD1B39090E5F669F514D51E2C1935A93477 122224~|~1~|~2~|~02/S5K~|~Conduit replacement.~|~04 - Reconstruction - No Added Capacity~|~86035867518CF57A5A1C817D10FFDD39DD37D599 113029~|~1~|~1~|~01/S>2~|~Resurfacing of SUM SR 619 from 2.97 to 3.10 and 3.13 to 3.85.~|~~|~C7C94E5FA75F056180EA1D9D318958C7C330BBB0 113029~|~1~|~2~|~02/S>2/BARB~|~Resurfacing of SUM SR 619 from 2.06 to 2.97 and 3.10 to 3.13, urban paving in the City of Barberton.~|~~|~CB5C59D15F33152FFA2963E0331A4D294E90DB70 109833~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order.~|~~|~886764FA704814740A4C63AC628DC7F2F99D4F3F 115133~|~1~|~1~|~01/IMS~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ACE14B62F27D5F896CB36582C12857CAE0CE9A87 121210~|~1~|~1~|~01/ENH~|~Sidewalk/SUP construction utilizing Federal OMEGA 4TF7 funds at 80/20 up to CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~52FA0BE5B645DFA48917313558E0396FFA3A3AE8 104353~|~1~|~1~|~01/S<2/KCEO~|~"01/S<2/PV/KCEO" Knox County CEAO approved - federal max of $428,800 for resurfacing of CR83 (Parrott Street)~|~05 - 4R Maintenance - Resurfacing~|~C30FEFEDF5FC24010312456F064F378823C4C14A 110723~|~1~|~1~|~01/STR~|~Slide repair from OH19-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5187196EFAECD52C2744BE2E39E779AA255D4992 91732~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. GAL 790 0.00-5.65 and VIN 328 0.00-3.32, 4.54-10.29. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~D11784471DC126F3809272565C0011B26921228E 91732~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using a chip seal treatment. ATH 685 0.00-0.30. Urban federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~2559A48FE0001891F67A82CD84595D1C7026C784 91732~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. ATH 685 0.30-5.24, GAL 790 5.65-6.67, MEG 124 0.00-7.50, VIN 124 0.00-5.74, 6.03-6.44, and VIN 328 3.32-4.54. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A4D7026FB87EC7D1060658D2DB54B6706E9DD16A 105324~|~1~|~1~|~01/NHS~|~Rehabilitate bridge BEL-7-1975 (SFN 0700541) by repairing substructure units, patching deck, replacing expansion joints and repairing pin/hanger assembly.~|~13 - Bridge Rehabilitation~|~26CD742E2DA8D0B10DFCF3000855DC11AC0F0C01 122301~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~5DDC58309F08BC4539042E99EC2F44EF4B549276 94040~|~1~|~1~|~01/BRF~|~Rehabilitation of the Delphos-St. Marys Road Bridge over Sixmile Creek, modifiying abutments to accept the new beams and paving approaches along with installing guardrail to meet current standards on SFN 0634697 AUG CR 66A 18.97.~|~13 - Bridge Rehabilitation~|~02FB87D20BEAD9BA2B38BE5A1F662E770936A762 121634~|~1~|~2~|~02/ENH~|~Construction of a shared-use path and street lighting~|~05 - 4R Maintenance - Resurfacing~|~BE92841D89EEB370DEBBFBCD54ECA34C3C299CF1 121634~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~3F40DE307B367124C816DC36682D97B9656A8EE9 109912~|~1~|~1~|~01/NFP~|~Landslide repair, 100% state funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D48F34D4B380DB42227EF1DC80E5580312A5154F 109912~|~1~|~2~|~02/NFP~|~Retroactive fuel price adjustment~|~~|~AA3C6DD33A4F6F4AF4ADA4AEECFC63030D9AD5E2 123477~|~1~|~1~|~01/NFP~|~Replacing guardrail on various routes throughout District 4.~|~21 - Safety~|~B78F1DC5D660218A4E7D1C8CD5AC7B1121716C9B 126495~|~1~|~1~|~01/SAF~|~Install new & upgrade current guardrail~|~21 - Safety~|~0FAA55E42FF3789F7D4EB8535C84F7B0B8167692 107510~|~1~|~1~|~01/NHS~|~Resurfacing HAS-151~|~05 - 4R Maintenance - Resurfacing~|~24A31BF1B9CFEA6DF17268711025B63EC76B8DFE 91599~|~1~|~1~|~01/IMS~|~Remove and replace the existing reinforced concrete deck on bridge (TUS-77-1980L, SFN 7902700) with a new reinforced concrete deck and repair substructure units. Also provide new approach slabs.~|~13 - Bridge Rehabilitation~|~705AAA80D236DE8E196DBBE28F6C35FE2A1CB57A 119747~|~1~|~1~|~01/ENH/WLFY~|~Construction of sidewalks within Village of West Lafayette.~|~28 - Facilities for Pedestrians & Bicycles~|~60DDF1C40EA4A06814117AF6810305CE4DD73351 124760~|~1~|~1~|~01/S>2~|~Repairs to structure FRA-62-9.21 over Scioto Big Run~|~13 - Bridge Rehabilitation~|~3069534969FA277CF7EA6EB62F26D48C86BDB4E9 102301~|~1~|~1~|~01/STR~|~Split for culvert work~|~44 - Other~|~21309FD4E0D50C8D463F65B0DE9ED19BA42B9920 114879~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~EB3A12A51B617AE4429A726D61DDFCD44A41CE0C 103621~|~1~|~1~|~01/NHS~|~Place concrete deck overlay on FRA-317-16.68 over Big Walnut Creek~|~13 - Bridge Rehabilitation~|~496963857CBB2786145B132314026E54DD22A325 115848~|~1~|~1~|~01/IMS~|~Reactive Pavement Maintenance.~|~05 - 4R Maintenance - Resurfacing~|~D675732E8B5600E093C719DD4A289E62F6225709 76388~|~1~|~2~|~02/S>2/RICH~|~Construction of video detection equipment at State Route 21 and the Ohio Turnpike and State Route 21 at Columbia Road. Summit County, Ohio.~|~44 - Other~|~A79C9FB4FABE6CB0DD86B9FB511A34C10070A31D 76388~|~1~|~1~|~01/S>2~|~Resurfacing from IR77 to Cuyahoga County (SLM 19.57-20.77) line on State Route 21, in the Village of Peninsula, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~C2A8927F410DE1DBEEBA5354CDCC35E42FC7F748 87187~|~1~|~2~|~02/STR~|~Resurface and perform pavement repair on the Rural portions of SR 73 and SR 122 in Bulter County. The limits of the Rural portion are on SR 122 between SLM 3.86 to 6.07.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0BA907E4E80DE536D733389B4B52FF3554B74200 87187~|~1~|~1~|~01/S<2~|~Resurface and perform pavement repair on the Urban portions of SR 73 and SR 122 in Bulter County. The limits of the Urban portion are on SR 73 between SLM 16.81 to 18.51; and on SR 122 between SLM 6.07 to 6.13.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F322EC09C23BA3A4C7D00EB12C62D3CDF2C5331C 102417~|~1~|~1~|~01/S>2~|~Resurfacing to MAH US 62 from 9.67 to 12.98Fine graded polymer AC Overlay to MAH US 62 from 12.98 to 13.1698~|~~|~35D4C785734F4C28D0C7CF042F062E99D066D64A 125180~|~1~|~1~|~01/SAF~|~District wide fast dry pavement markings~|~21 - Safety~|~27BCEA5DCCA5565FF974C748BBB1979B27034A89 107157~|~1~|~1~|~01/IMS~|~Geological Site Management Funding - 4SF7 (90% Federal) / 4SS7 (10% State) - Rock scaling along IR 70 in Licking County.~|~~|~0FD620E8653A2446F1E3884430AF97FC655FC471 100362~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~94D10245D8EC5F7CE124E40EE29E536C9AA9CFC4 119569~|~1~|~1~|~01/S>2~|~Construct intersection & safety improvements~|~21 - Safety~|~FE8460E38697ED7100F512BA278972F577BFA776 106768~|~1~|~1~|~01/SAF~|~Intersections: LOR-57 & 254, MED-3 & Hamilton, and MED-42 & Hamilton install Wavetronix Radar Detectors~|~~|~6F06689B98D757171AC1FF3B5B12BEC1FFAC84B4 103786~|~1~|~1~|~01/STR~|~Landslide repair. MRG 377 12.70. DSR MRG-002.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7E67EEE861E46015CAD907C8A1A06396CFE141A6 95426~|~1~|~1~|~01/NHS~|~Subsurface exploration for abandoned underground mines. ATH 33 7.09. NHS route funded 80 federal/20 state.~|~44 - Other~|~7103E2DFA4DAF8D1077656410EE497BB61E335AC 120932~|~1~|~1~|~01/NFP~|~Tree stump and pruning.~|~44 - Other~|~A0BF321678C717579A957646F3DB2F257B77A154 95465~|~1~|~1~|~01/NHS~|~District Preservation 7BPB (100% Bond) then 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comment - Resurfacing on Lic-SR 161-00.00 to 1.66 and Lic- SR 161- 2.99 to 8.84; Lic-SR 37-12.22 to 16.21, included are repairs on SR 310 concrete ramp~|~05 - 4R Maintenance - Resurfacing~|~61284B2D0C18D857097327B878AEB8CBCFA383EC 95465~|~1~|~3~|~03/NHS~|~District 6 Preservation Pavement Funding - 4PF7 (80%Federal)/4PS7 (20% State) - No CAP- Resurfacing on Fra-161-22.69 to 23.71~|~05 - 4R Maintenance - Resurfacing~|~D3D45054F702A62E3CB586BC28DCF0AEC5DF9F72 95465~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funds - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge Deck Sealing on LIC-161-00.00~|~47 - Bridge Preventive Maintenance~|~150C656688023DFAE10CF426372FFF4B147275F8 114937~|~1~|~1~|~01/S<2~|~Remove Br. No. LOG-273-0002 and replace with new structure.~|~10 - Bridge Replacement~|~2D310BC322247D74965C872A47E47E9A9EA0A9D9 85051~|~1~|~4~|~04/S<2~|~100% City of Mansfield Items within split corp areas at south end of project~|~05 - 4R Maintenance - Resurfacing~|~14DB29BD0C407E90F1F4FF8DF2B05C3D403E3699 85051~|~1~|~3~|~03/S<2~|~Resurfacing within Mansfield Corp Limits 80/20 - District Allocation/City of Mansfield - Split Corp Areas at south end of project~|~05 - 4R Maintenance - Resurfacing~|~29564F1BBBC08004F9D4E5FD24B1F5B792D9F026 85051~|~1~|~5~|~05/STR~|~Work to structures sfn:7006632 RIC-545-08.60 and sfn:7006691 RIC-545-10.12~|~13 - Bridge Rehabilitation~|~295EA23F5DEE2B14EC2C9D344E88E3F90AA0E4B9 85051~|~1~|~1~|~01/STR~|~District Allocation - Resurfacing - Rural - RIC-545-2.80-11.48/ASD-545-00.00 - 05.47~|~05 - 4R Maintenance - Resurfacing~|~A63C8E8851AEC8A6B4E5E01B76139BD8CC7D7308 85051~|~1~|~2~|~02/S<2~|~District Allocation - Resurfacing - Urbanized Area - RIC-545-01.44 - 02.80~|~05 - 4R Maintenance - Resurfacing~|~C7BD659384C5F6A00B4D9FC889100C4E9714D00A 119341~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~823D0F95E3586F0FD182FC595CBFCFA8FE4C6556 119341~|~1~|~2~|~02/NHS~|~Resurfacing.~|~~|~4BA2B1FB9F839C333F7CD99AEF1BD8C9F9F532A4 95952~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority~|~44 - Other~|~354C24B3E71261C5FE726602F6A00FF0871E3701 92643~|~1~|~1~|~01/NHS/Canf~|~Resurfacing of US-224 from SLM 12.69 to SLM 13.23, in the City of Canfield, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~394139F1C78CACC875F4A07C87340BBE0B70D291 92643~|~1~|~2~|~02/S>2/Canf~|~Resurfacing of SR-46 from SLM 9.29 to SLM 9.39, US-62 from SLM 8.40 to SLM 8.69, SR-46D from SLM 0.29 to SLM 0.39, US-62F from SLM 0.00 to SLM 0.29, in the City of Canfield, Mahoning County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~9430FAA42A2527C1E47FB95DF7D59C84F74468CC 120490~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~625FC1AC82A930756A553742D97ED2EB0598B328 94520~|~1~|~1~|~01/SAF~|~Provide anti-skid treatment on portion of Foster Maineville, add lighiting to intersection of Foster Maineville at Butterworth and place optical speed bar markings on wilmington road east on nixon camp road.~|~21 - Safety~|~BB98836DEAA49383CB1D94793C505BC36D9813B5 101241~|~1~|~1~|~01/STR~|~Resurfacing SR 4 (STP Rural).~|~05 - 4R Maintenance - Resurfacing~|~3329ACD4AF1E0A917DFF2984D72A3DEF549B9F2A 101241~|~1~|~2~|~02/BRO~|~Plan split for SEN-4-0441 bridge~|~47 - Bridge Preventive Maintenance~|~09FAE88E5D5BB91E7BB85656660A44C515CE7408 96940~|~1~|~1~|~01/NFA~|~Task order construction inspection services.~|~17 - Construction Engineering~|~6E9C745E24B7B8BD21A85063A0C7C3783FA5A0DD 87160~|~1~|~1~|~01/STR~|~Rural route. GSMP funds. Failed embankment. replace culvert, flatten out embankment to mitigate landslide.~|~04 - Reconstruction - No Added Capacity~|~9D83579E3DE8CDEE8D90DB74D4914784ADFD270E 123781~|~1~|~1~|~01/IMS~|~Deck Replacement.~|~13 - Bridge Rehabilitation~|~65745340947BC4CE7DC6CA65E18D83132A498312 107242~|~1~|~1~|~01/NFA~|~The City will extend Colleta's Way in the City's industrial park 1850 feet north.~|~01 - New Construction~|~88E1CCF84D154B2786AF99DE21E79BBDC8A2EE86 119445~|~1~|~1~|~01/BRF~|~Plan split for municipal bridge work.~|~10 - Bridge Replacement~|~82E1989BCA86F195905E050A91B23E1B05DD3566 84221~|~1~|~1~|~01/STR~|~Resurfacing of existing roadway with asphalt concrete State Route 47 in Ansonia from East Corporation Limit (SLM 11.05) to US Route 127 (SLM 13.88).~|~05 - 4R Maintenance - Resurfacing~|~0CBAAA6E7368C24996173FB868A90A48EE143301 84221~|~1~|~2~|~02/STR~|~Pavement markers needed along the resurfacing project~|~05 - 4R Maintenance - Resurfacing~|~CF430F328B8DEA39CFB3465104510429E6AF27CE 99658~|~1~|~1~|~01/NFP~|~Pavement marking maintenance contract~|~21 - Safety~|~4637A78A5CBFD0BC10E8F1D92F5609A11B5D563C 125220~|~1~|~1~|~01/NFP~|~Mowing contract for various routes in Franklin County~|~99 - State Preventative Maintenance~|~445E1A6C86254BECE2B177FC0199407F39051C29 100896~|~1~|~1~|~01/NFA~|~BRO 763 1.51 (SFN 0803901)~|~10 - Bridge Replacement~|~DE4FDC97D05AAD9161464AED8D7B820A1DC2AC5B 114254~|~1~|~1~|~01/SAF~|~Intersection improvements at Parkville/Spring Run~|~21 - Safety~|~7B60483AD9169E4DCDFDED104A031040F814925A 114254~|~2~|~2~|~02/SAF~|~SUP from Maple Canyon to Cleveland Ave~|~21 - Safety~|~460823C99EB3C1615C480374289F97DE873DAC1B 94417~|~1~|~2~|~02/STR~|~Bridge Work~|~~|~3D6AE9C94E8E8AB347F9D98D7805D5E6A930225E 94417~|~1~|~1~|~01/NFA~|~2 lane resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8794056A7667C2DAAC54FA0CD046754859EA7BBB 115609~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~E8C7354C1B57834396E89FFAEFDE65E83B0C6547 97576~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - Replacement of deficient bridge (4536428) on Licking County Road 39 utilizing CEAO funding (4B87) w/ Federal max (at 80%) of $645,920.~|~10 - Bridge Replacement~|~A42E49BAF6EE359FF6E91DF6FED988FF9123297A 91342~|~1~|~1~|~01/S<2~|~Urban paving SR 188 from SLM 0.00 (US 22) to 0.22; 0.31 to 1.43; 1.66 to 2.57~|~05 - 4R Maintenance - Resurfacing~|~668383F94A4D0411C8E4831A19B859B3FBB9A3FA 91342~|~1~|~2~|~02/STR~|~General system resurfacing SR 188 SLM 1.43 to 1.66~|~05 - 4R Maintenance - Resurfacing~|~5444894731228FD9E70492E6A0A991B87A59F322 91446~|~1~|~1~|~01/S>2~|~Westerville urban pavingDEL-3: 0.00-1.38~|~05 - 4R Maintenance - Resurfacing~|~4752E87EAD1C48AF1D305B8A078345E18E03FA11 100917~|~1~|~1~|~01/NFA~|~Adding J&C Funding Event~|~01 - New Construction~|~CDC32937729D1405A8994BF615CED4CEBB6BDEB1 107584~|~1~|~1~|~01/STR~|~Flat Sheet sign project for FY2022 for MRG county. 80% Federal and 20% State funded.~|~21 - Safety~|~CA74EDFF7149B1C8020BE0EFFD38A8DFBBCF2EBF 107584~|~1~|~2~|~02/NFA~|~Flat Sheet sign project for FY2022 for MRG county. ~|~21 - Safety~|~E88C40F8288BEA55B3BDCF696167F4814234D133 120484~|~1~|~1~|~01/S>2~|~Bridge replacement~|~10 - Bridge Replacement~|~55FAF53F3F05C04905FCC0B30C9241F48AAAFC54 111413~|~1~|~1~|~01/ENH~|~Construct sidewalks along S. Washington St. at 95% Federal/5% Local (95% 4B37/5% LNTP)~|~28 - Facilities for Pedestrians & Bicycles~|~56E51F6C9AA7DA23BFECB81B9504ECCD86141754 94428~|~1~|~2~|~02/STR~|~Two Lane Resurfacing WAY-604-18.59 to 20.66~|~05 - 4R Maintenance - Resurfacing~|~56EB2BE9ECDA88580984322305D474947EB9A61A 94428~|~1~|~1~|~01/NFA~|~Two Lane Resurfacing WAY-604-7.56 to 18.59 (Not on Federal Aid System)~|~05 - 4R Maintenance - Resurfacing~|~E1C316F53B9EDC90BB8452B047A114E4BF01E345 97644~|~1~|~1~|~01/BRF~|~SFN 8750025~|~13 - Bridge Rehabilitation~|~DBE559A3C67D46BDCBBE09F3842D0E4500B8235A 97644~|~1~|~2~|~02/BRF~|~SFN 8757720~|~13 - Bridge Rehabilitation~|~B882996200646B9BB1D949B2B9E2A0ABC0531996 97644~|~1~|~4~|~04/BRO~|~SFN 8732477~|~13 - Bridge Rehabilitation~|~FB14A95411C237DB8E1795293B0B791DA36F99B2 97644~|~1~|~3~|~03/BRO~|~SFN 8747717~|~13 - Bridge Rehabilitation~|~09E5E49D3B0DFEADED62F2A037A13148FBF9FB58 88568~|~1~|~1~|~01/NFA~|~Resurface the existing SR 364 roadway with asphalt concrete AUG-SR-364 0.000 to 5.710 MER-SR-364 0.000 to 0.040 DAR-SR-364 0.000 to 1.030~|~05 - 4R Maintenance - Resurfacing~|~9D077BDCA9170A3FB1CD694D25F1D6FAB98B7C81 119252~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~53F53EFD8C3EBFEB9970BB921EC9DE7EBC1AA794 119252~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~4FA6C4F873B84406F2CF4B84C0AF03C8836DE886 119252~|~1~|~3~|~03/S5K~|~Resurfacing.~|~~|~2B2C37E0318E1D5F28065088CE5448994D1FE737 119921~|~1~|~1~|~01/NHS~|~PROTECT bridge from scour by extending pier piling encasement and installing RCP along piers.~|~48 - Bridge Protection~|~017851D7BF5C184128E61F6178AC977F15BCA180 101458~|~1~|~1~|~01/STR~|~DSR# JEF-006~|~~|~0FB6DD2E94449D88FF30A87480DC681D84D84E8F 115666~|~1~|~1~|~01/S<2~|~Urban resurfacing west corporation limit of Germantown~|~05 - 4R Maintenance - Resurfacing~|~880A775F56BD352B4271449439FBC35B419B48F4 99762~|~1~|~1~|~01/S<2~|~Mill & Fill Palmer Street from Pittsburg to Bowman.~|~05 - 4R Maintenance - Resurfacing~|~E8359EEFF46BC04E251AA071EA89F0090190CC8D 100662~|~1~|~1~|~01/STR~|~Chip sealing BEL-9 from TR 1090 to the HAS Co. Line and BEL-647 from SLM 2.47 to the JEF Co. Line.~|~05 - 4R Maintenance - Resurfacing~|~E31FFA985C34726B3340B1445E1B421225176A91 100662~|~1~|~2~|~02/S<2~|~Chip sealing BEL-647 from Martins Ferry WCL (SLM 1.62) to SLM 2.47.~|~05 - 4R Maintenance - Resurfacing~|~40404B9833BE4CD438E9E79328A08B0FFD8FD26C 86153~|~1~|~1~|~01/BRO~|~Bridge replacement project. NOB 147 0535, SFN 6102700. BR Eligible. Funded 80 federal/20 state.~|~10 - Bridge Replacement~|~E297222F8061B9F84B1B887A1B2A4BABB751A2E2 89154~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge Project~|~10 - Bridge Replacement~|~7F34CCFF5386F451EB1C6CBED046EB8422B44C5B 126347~|~1~|~1~|~01/NFA~|~Bridge replacement ~|~10 - Bridge Replacement~|~099217363124726C018D4A9E7324728ADB351E4C 102780~|~1~|~1~|~01/STR~|~This plan split is for bridge work on rural routes.~|~10 - Bridge Replacement~|~F68DF37C9FE238B812212B3C7F09358436E94C60 93118~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~6A20E4BA79FE1ED4F635DC25BF019FF74A953AEF 93118~|~1~|~2~|~02/STR~|~BridgesSFN 0300799 ASD-39-1.31SFN 0300829 ASD-39-1.62SFN 0300845 ASD-39-3.58SFN 0300926 ASD-39-4.89SFN 7002556 ASD-39-26.56~|~13 - Bridge Rehabilitation~|~E8824B11763FA296F95794063F89FB5865B17EF3 84539~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE 26 16.33-17.06, 29.45-30.10, MOE 145 17.87-21.41 and 22.06-25.80. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~1CC8B1FAF816B984E405E628D7C15E8536E32280 84539~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 26 17.06-17.91. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~B0531288E76A4AC78E5DC49B28FA895A4AB66F99 93706~|~1~|~1~|~01/S>2~|~80/20 split between federal and local for the resurfacing of Bainbridge Road using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~3423927D5A40BC2650EBE6FD3D45FCA8DE9A3C04 114663~|~1~|~1~|~01/NHS~|~Project to repair bridge HAM-50-22-18 and HAM-50-2316 that both carry US 50 over a relief area below Mt Adams in Cincinnati. Repairs include pier repairs, expansion joint repairs, abutment repairs, and other related items.~|~13 - Bridge Rehabilitation~|~7C6675AB187A96DD6BCB3891223EA7D14F0EECFF 106201~|~1~|~1~|~01/IMS~|~Lighting system improvements on STA IR 77 at SR 800.~|~21 - Safety~|~3E565278E325933B064A5035FCCBBC6318087615 99770~|~1~|~1~|~01/NFP~|~Crack sealing of drives and parking areas within Garber Nature Center, a Preble County Park District property. Parking lots will be re-striped and backup aggregate berm will be provided where necessary.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1F2F7A5FE5FB6DA5F03BAF34B7DE9D9A76581999 95113~|~1~|~1~|~01/ENH/Camp~|~New lighting to Casey Drive in Campbell and Bob Cene Way in Struthers, Trumbull County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~84BAF5D445A88DCAFF995AF46C8A89B0A89B9149 111130~|~1~|~1~|~01/NFA~|~Bridge replacement project. MOE CR 29 6.93 SFN 5631068. Funded 100% Federal.~|~10 - Bridge Replacement~|~4B3DD6F112028AA5A8748720EE2C76CE9627EF64 123937~|~1~|~1~|~01/NFA~|~Slope stabilization along SR 284 in Muskingum County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9586EFF5202E1E4947D7BA89183003C3FFD2D3F0 94048~|~1~|~5~|~05/NFP~|~Bridge repair and spot painting of structure SFN# 7603312, STA-IR77-8.28.~|~13 - Bridge Rehabilitation~|~299298CE58C17BE7D3CB1D8FB6159543ADFA5CCC 94048~|~1~|~4~|~04/NFP~|~Bridge repair and spot painting of structure SFN# 7711220, SUM-SR764-2.14.~|~13 - Bridge Rehabilitation~|~56A0BF0EA25E9E796C67C42AF231DA22C4B8D73B 94048~|~1~|~3~|~03/NFP~|~Bridge repair and spot painting of structure SFN# 7704534, SUM-IR77-30.96.~|~13 - Bridge Rehabilitation~|~5F2083278BE7CFF68EBD1ECBDC8DAFF311B95E50 94048~|~1~|~1~|~01/NFP~|~Bridge repair and spot painting of structure SFN# 7607423, STA-US30-7.68,~|~13 - Bridge Rehabilitation~|~BD8D3BBB8D824A3E2A9080FC12D9C5DD7D627249 94048~|~1~|~2~|~02/NFP~|~Bridge repair and spot painting of structure SFN# 7603568, STA-IR77-9.08R.~|~13 - Bridge Rehabilitation~|~C3C8452C8ED59AD4333F55EDCD41EDB81E45FCBA 100920~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete various routes in Champaign County: CHP SR54 SLM 1.70 to 8.28 CHP SR550 SLM 0.27 to 0.59~|~05 - 4R Maintenance - Resurfacing~|~D034446F63BB72088746F481FF527007A58A360E 116745~|~1~|~1~|~01/IMS~|~Culvert plan split for the spray liner on DEL-71-5.751.~|~44 - Other~|~9D5BB93E10D3298EBE22A93A060236B05283EDED 94516~|~1~|~1~|~01/NHS~|~Bridge re-deck of sfn# 5005434, provide repairs to slope protection, including steel retaining wall. Replace signing. In the City of Youngstown, Mahoning County, Ohio.~|~13 - Bridge Rehabilitation~|~0D97F04C3AB5C1A0A9AFA472932194D0854383C6 98859~|~1~|~1~|~01/SAF~|~Replace all of the controllers and coordinating them with a radio interconnect that will communicate with the exisiting control system. In addition add PTZ cameras where applicable.~|~21 - Safety~|~143F93B317F065BC5C71C04BA55AD1023A3000BA 98859~|~1~|~2~|~02/S>2~|~Replace existing span wire traffic signal supports with mast arms and provide back plates and new vehicle detection installation.~|~21 - Safety~|~FD6B6674A78CDF648BCD5E041BD7D55C344137C6 94583~|~1~|~1~|~01/IMS~|~Apply antiskid treatment to a portion of Ramps A, C, D, G and H~|~21 - Safety~|~BA524C393C86BA81C98AB5FCA1EEDDA32170E0FE 127177~|~1~|~1~|~01/STR~|~Flat Sheet sign replacement project in Vinton County.~|~21 - Safety~|~8BE9E5CC2B0D7F59AEE325D9442832F5E3599992 105970~|~1~|~1~|~01/BRF~|~Bridge Replacement Split~|~10 - Bridge Replacement~|~C3C6A4D8D3D821214F23DA0C7B93FCA4BCA658A4 117495~|~1~|~1~|~01/MPO/STCE~|~Construct roundabout.~|~21 - Safety~|~6A5CFD814988AF87FD50995937FE8DFF4825B0E0 121486~|~1~|~1~|~01/STR~|~STP Rural Plan split~|~05 - 4R Maintenance - Resurfacing~|~DAB04FF3A5AAED60C25248523AA1255A79A0C118 121486~|~1~|~2~|~02/S5K~|~STP 5,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4608366701CF5AF7AEB58B4771F1CBAA5020C5D1 122881~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~595244C90276A3133A242D3C602E8C955C6F2506 107472~|~1~|~1~|~01/STR~|~Microsurface existing surface~|~05 - 4R Maintenance - Resurfacing~|~0D3DA6A9511A83303D6AEC3E9BAB52E2EB760A12 107472~|~1~|~2~|~02/S<2~|~Microsurface existing surface~|~05 - 4R Maintenance - Resurfacing~|~791CE8EE5F69D41AF2627EDEF4E41C33BF534F28 118648~|~1~|~1~|~01/S50~|~Bridge replacement on 6th Street int he City of Mansfield (Muni-bridge funding)~|~~|~6B1372DDFF1B5B9CB486F918C5AD1F41E4E0D3F6 118648~|~1~|~2~|~02/S50~|~Muni-bridge funding for 6th Street bridge replacement - CE~|~~|~677E93C6F2B242D60D65427B672A3BB7BDD9E10A 86982~|~1~|~1~|~01/NHS~|~Resurfacing of NHS Federal 80%/ State 20%. ATH US 33 5.75-5.95.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2322A3A91385A3B5D97660B3FED3F6EA38ACED7F 86982~|~1~|~3~|~03/NHS~|~NHS Federal with Nelsonville 80% Federal and 20% Local. ATH US 33 1.88-5.57, 5.68-5.73.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~49BE92B7DDC25388BE0C3BB95B990E6C7DC5B69C 86982~|~1~|~4~|~04/S<2~|~Other Federal Aid Prin Art Federal 80%/Local 20%.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D7AD71254742B5BC4B0C5B0553EEED71D323FD5 86982~|~1~|~2~|~02/STR~|~Resurface Prin Art (other) Federal 80%/State 20%. HOC US 33 16.82-18.93.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE34358CB967F32F2228BA963CD5AB7413259DAA 96951~|~1~|~1~|~01/STR/HIG~|~It is proposed to replace an entire structure on SR 134, 0.60 miles north of US 50 in Highland Co.~|~10 - Bridge Replacement~|~D7A7F41EAE7E7D4C73A210FC7F81C78A671E7DD0 121097~|~1~|~1~|~01/NFP~|~Plan Split~|~17 - Construction Engineering~|~9995A2754AB37005BD20651612426D614EC33EAC 112289~|~1~|~1~|~01/STR~|~PIK-104-0.71 Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~2D7552D2CAEF67012DA7C4B5ADB65855DF7DE266 126159~|~1~|~1~|~01/IMS~|~Plan split for all work associated with WOO-280 culvert~|~04 - Reconstruction - No Added Capacity~|~35EA9BF0F8CEA342D6C137B75864E2BDB2B23A62 108213~|~1~|~1~|~01/IMS~|~Landscape maintenance at various interchanges~|~44 - Other~|~D44733FC739B096D38D0090A0AAC3C4176F5A6E2 125954~|~1~|~1~|~01/NFP~|~Plan split for mowing district roadways using maintenance funds~|~44 - Other~|~7344055DFF4D3CF885342074BE5F1513013F4313 98219~|~1~|~1~|~01/IMS~|~Median inlets~|~04 - Reconstruction - No Added Capacity~|~85D20EC1900CD4B84AE83D8A9711DAE5B0AE54E2 107329~|~1~|~1~|~01/NFP~|~Split for tree removal/trimming work~|~44 - Other~|~7AF503FA0AF0068A437DD7205A97118F1B90C3E1 96195~|~1~|~1~|~01/STR~|~Widening of State Route 44 from Interstate 76 to County Route 18 (Tallmadge Road), Rootstown Township, Portage County, Ohio.~|~~|~7653B2AAAFD829AB1B5940B8A933212579B1F133 101045~|~1~|~1~|~01/S>2~|~Resurfacing MAH SR 46 from 10.83 to 13.84MAH SR 625 from 0.22 to 2.59TRU SR 46 from 0.12 to 1.85~|~05 - 4R Maintenance - Resurfacing~|~FA22315F7067000C09C84C4F7D0BF533E322BE36 124343~|~1~|~1~|~01/SAF~|~Local-Let - Safe Routes to School project - Safety funded 4SC7~|~21 - Safety~|~C011C9E8EADA049D7F403338FE996BFD127CDA8C 92172~|~1~|~1~|~01/NFP~|~Pavement marking at various locations. 100% State.~|~21 - Safety~|~AE81E97255CFA2D1A4423CCE18546361396A8701 106406~|~1~|~1~|~01/SAF~|~Widen pavement to provide north bound left turn lane~|~21 - Safety~|~B468B4048CC148CB9C99D526003B0A45A90EF576 106406~|~1~|~2~|~02/S>2~|~Work to extend culvert at SLM 4.83~|~05 - 4R Maintenance - Resurfacing~|~0E08594028FA067908936223D685403D93BFF9EB 106406~|~1~|~3~|~03/S>2~|~Resurfacing SR 104 with limits of MOT~|~05 - 4R Maintenance - Resurfacing~|~79D2BC92902F23D2EA2F3DA610FD07ECA094BAAE 100448~|~1~|~1~|~01/SAF~|~FY2021 District wide raised pavement markers.~|~21 - Safety~|~61497102885C7582013F0E783951CE45391A6033 106157~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 5.61. DSR MRG-004. Rural other federal aid funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EEEEC72D804EF14454531A784EB7B263FF58128A 87162~|~1~|~1~|~01/STR~|~Rural route GSMP funds. Failed embankment. Install retaining wall to mitigate landslide.~|~04 - Reconstruction - No Added Capacity~|~26056D6CC5EC8643D58AC0E7201106C0179E61A6 105695~|~1~|~1~|~01/S>2~|~Apply herbicide along roadsides for weed control on 4 lane roads.~|~44 - Other~|~A6ADD958E89E20B7115303683820DE7576C11FF8 91842~|~1~|~1~|~01/S<2~|~General System asphalt resurfacing on COL-170-0..; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~EA11493B8AFC403E87191811EBA422156A353F5B 105269~|~1~|~1~|~01/NHS~|~Resurfacing of COL-30 from SLM 9.40 to 17.70~|~05 - 4R Maintenance - Resurfacing~|~507547183C75D263D3B31595CDA78976CE5727C0 93795~|~1~|~1~|~01/NFA~|~Replace Brdg structure 4404742Project Termini: Located 4.17 miles north of SR217 on SR775. Project Description: It is proposed to replace the structure w/a 4 sided precast box. 100% State01/NFA/BR/State~|~10 - Bridge Replacement~|~5D81430D2D3A4A734DA552E7E5CA609058144FF0 117810~|~2~|~2~|~02/S5K~|~Work within the urban population boundary of Upper Sandusky. CR 430 from 1.171 to 1.684~|~05 - 4R Maintenance - Resurfacing~|~7B39EA0485D88D9C1419947BC011F4D46902D8B6 117810~|~1~|~1~|~01/STR~|~All work within the STP rural population. Everything except CR 430 from 1.71 to 1.684~|~05 - 4R Maintenance - Resurfacing~|~6622AA693C96E6D58C6D9F5617629B70319475E0 103742~|~1~|~1~|~01/SAF~|~Add sidewalks and pedestrian countdown signals around intersections on priority corridors in Youngstown. Install bicycle racks near schools.~|~21 - Safety~|~E050F510E8A9D0BA328963013BB34B0C0383EEF5 96599~|~1~|~1~|~01/BRO~|~The project will rehabilitate bridge JEF-213-1844 (SFN 4103270) by replacing existing non-composite box beam superstructure with a new composite box beam superstructure. Some profile adjustment is being performed to maintain vertical clearance over the railroad tracks. The approach slabs will be replaced.~|~13 - Bridge Rehabilitation~|~A6236DA17CBAB9F5514D3EE3CA87BA6365484E0D 94754~|~1~|~1~|~01/SAF~|~Improve intersection of Southbound exit from I71 to eastbound SR126 by installing a signal and reconfiguring eastbound SR126 to separate traffic bound for I71 from eastbound SR126 traffic~|~~|~347EA73F6030D3135B85CDF80B350E4EBEF7E16C 122213~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR80-B~|~~|~64A3B7E1A931140BDDD9A83F3CEB924BFFFEFBFC 125908~|~1~|~1~|~01/MPO~|~Upgrade traffic signals in the City of Belpre to vehicle actuated signal control with radar based vehicle detections to improve operational efficiency. Various locations within the City.~|~~|~5DDFF816E5E2B2C65B2CB631B4B2EA2A5FD7979C 118522~|~1~|~1~|~01/MPO~|~Plan Split for MPO funded STBG scope~|~05 - 4R Maintenance - Resurfacing~|~2E875E7C37E645A4032280B66607662E6FC7185B 118522~|~1~|~2~|~02/MPO~|~Plan Split for MPO funded scope associated with sidewalk (Improvement Code 28: Facilities for Ped and Bike).~|~28 - Facilities for Pedestrians & Bicycles~|~06DAC655EA1BFA9C5D47BD9382396ABEEB21E4FA 103901~|~1~|~1~|~01/NHS/MTVE~|~LP Small City Program - 4B97 (80% Federal) / TRC (15% 4BG7) / 4BG7 (5% Local) - See CAP Comments) - Reconstruction of SR 13 within the City of Mount Vernon from Franklin Street to Stump Street~|~04 - Reconstruction - No Added Capacity~|~BB7C9069EA6C905B3D78B5188DD663452A48DB34 83290~|~1~|~1~|~01/ENH~|~Phase One of reconstruction of Lock One removing foundation stones and replacing with a concrete foundation utilizing the TE funding.~|~32 - Historic Preservation~|~358E613358B7A50314E5F13FC3E2E2F4D1396C62 83290~|~1~|~2~|~02/NFA~|~Funding split to cover overage of TE funding on reconstruction at Lock One in the Village of Lockington.~|~32 - Historic Preservation~|~5D8E0C629CCAD09EEF137ADA055DD8A629B4E8AE 79893~|~1~|~1~|~01/STR~|~HIG SR 73 14.96 - 15.34 @ Prospect RoadOther plan split for safety issues at intersection. 80 Fed/20 State01/STR/PV/State~|~21 - Safety~|~792D02E98EB71B2C30CCEC0E7490A0AA9857DCC9 116970~|~1~|~1~|~01/NHS~|~Plan Split to program project. Update when final scope of work is known.~|~47 - Bridge Preventive Maintenance~|~D657B9E794E22D6468FD6B49A3B96E04D219090D 104258~|~1~|~1~|~01/NFP~|~MOWING~|~44 - Other~|~3B5519E0E479E4A31B1888D277149FB4892965C3 110715~|~1~|~1~|~01/STR~|~All work in the plan split using district allocations.~|~05 - 4R Maintenance - Resurfacing~|~C609EA7A715801B0B2CDF2D271D9E7D6EC9AC154 117228~|~1~|~1~|~01/CMQ~|~Primary plan split for CMAQ eligible items.~|~04 - Reconstruction - No Added Capacity~|~7699243934343B0260A96773DD705BC7E78B28B0 117228~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope, such as water main replacement.~|~04 - Reconstruction - No Added Capacity~|~CF72710B309A1C70C487C3D80519DC21DB20B850 116373~|~1~|~1~|~01/SAE~|~Upgrading signals to include flashing yellow arrows on Hilliard Rome Road and Roberts Road~|~21 - Safety~|~5259F0C2F06CBC03BB069657EC6451F4EA2DBD7A 126953~|~1~|~1~|~01/IMS~|~Bridge~|~10 - Bridge Replacement~|~1561C3C17CBDD6585A4350A9006B3260D8F88F42 98523~|~1~|~1~|~01/BRF~|~District Preservation Program funds. Off system bridge funds. SR 330 is a Minor Collector.~|~13 - Bridge Rehabilitation~|~8072A15A5A57BD81A803606D3A19D6F4060F106B 92009~|~1~|~2~|~02/BRO~|~Portal Repair~|~13 - Bridge Rehabilitation~|~2F8AA86383CCA45D5EF82B192C151E8E98755457 92009~|~1~|~1~|~01/BRO~|~Major Bridge Funds~|~13 - Bridge Rehabilitation~|~7F6CCE93C568E12516CEB928D29E70A93872D11F 80418~|~1~|~1~|~01/IMS~|~Plan split for all pavement work, no added capacity.~|~04 - Reconstruction - No Added Capacity~|~26E45C6F75163D91E56F69CECF77DDA0817FCBD5 80418~|~1~|~2~|~02/IMS~|~Plan split for all bridge work, no added capacity~|~13 - Bridge Rehabilitation~|~4B60902C872F382948AECB8C9B26BF39A4BD27B9 80418~|~1~|~3~|~03/IMS~|~Split for all pavement work with added capacity~|~03 - Reconstruction - Added Capacity~|~5FA1708023C0D5DFB7AC54400134602CC97A7B19 80418~|~1~|~4~|~04/IMS~|~Split for all bridge work with added capacity~|~13 - Bridge Rehabilitation~|~F3CA823642542765368212507BB622DCE72D363F 80418~|~1~|~6~|~06/NFP~|~Split for on-going services.~|~17 - Construction Engineering~|~B350AB6441127201FB86A7CC939F764D4E92EAD3 80418~|~1~|~5~|~05/NFA~|~Split for consultant inspection services~|~17 - Construction Engineering~|~673B0EA17AD7A3095697EF79A050B9FD210CA7FC 80418~|~1~|~7~|~07/NFP~|~Split for crash repair work on the NB I-271 bridge over Miles Rd~|~13 - Bridge Rehabilitation~|~EFFE95722BB39B8874366D6F541DEA5162E0388D 80418~|~1~|~8~|~08/IMS~|~Split for replacing the existing structure over Bedford Road with a totally new structure.~|~10 - Bridge Replacement~|~183054B93B17FE17D13B4B41254E6298024D0CE0 80418~|~1~|~9~|~09/IMS~|~Split for the new structure as part of the NB I-271 slip ramp to Broadway Ave~|~08 - Bridge - New Construction~|~BB23714B441B7AC50F488390D3A4965B3F50FE24 109971~|~1~|~1~|~01/STR~|~BRO 50 4.49 SFN0800511 Bridge replacement~|~10 - Bridge Replacement~|~107B5FA184FD08C8F2E280CE9E549A3A93BB5E63 108553~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 9.80-9.84. DSR MOE-024. OH2018-1. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B497336EA1459C87C1EDE34A15F5BC55DCC56E0F 88134~|~1~|~1~|~01/IMS~|~add missing movements at sr126 interchange, wb to nb and sb to wb.~|~~|~6EDCEAD82DFB9678CB2A0479CF1F5FACE1A94A0F 92676~|~1~|~1~|~01/S>2~|~Resurfacing of CR-244 from Mount Pleasant to Railroad tracks.~|~05 - 4R Maintenance - Resurfacing~|~D532FFCD6E354768B68360B2B56A73D97C611934 94384~|~1~|~1~|~01/STR~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~84B881602D76145184C8D6E714776D492E6BF82E 94384~|~1~|~2~|~02/STR~|~Bridge Work: CRA-100-20.75, CRA-100-25.19, CRA-19-23.63~|~13 - Bridge Rehabilitation~|~B35264D52BE99DEF4113EF3A0F56F3EB5097D467 98253~|~1~|~1~|~01/IMS~|~01/IMS/BR/ : PLan Split 1 for Mus-70-1142, Mus-70-11-1142 E~|~~|~13DD68A62E8159C03E6B940D7AE257A4AF31034E 121905~|~1~|~1~|~01/ENH~|~Bridge replacement project. Hune Covered Bridge WAS TR 921 00.50 (SFN 8433720). Funded 95% Federal/5% Local.~|~10 - Bridge Replacement~|~B17E550A95D5258054B64EDCF7B819B6D0ACE527 122445~|~1~|~1~|~01/IMS~|~Reduce culvert outlet scour and stabilize the slope below the roadway~|~66 - Resilience Improvement - Highway Project ~|~3070B478C868B168388A2DB98CAEF86675EE0418 110038~|~2~|~4~|~04/S5K~|~Plan Split for Urban Paving funded work within City of Napoleon.~|~05 - 4R Maintenance - Resurfacing~|~669120BD6FF5A2E26D84D729F984071231368602 110038~|~2~|~5~|~05/S5K~|~Split for 100% locally funded aspects of Urban Paving work in Napoleon, such as full depth pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~04945891D059ECB2A197C8CDDB975DF764F3BC24 110038~|~1~|~3~|~03/STR~|~All work associated with bridge HEN-109-1876~|~13 - Bridge Rehabilitation~|~3B01A88BA0A7D23F72780E3A0DB15231C1E46FE1 110038~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SR-108 from SLM 18.726 to 22.73 and SR-109 from SLM 0.00 to 4.01, 16.58 to 19.255~|~05 - 4R Maintenance - Resurfacing~|~8BEAE9ABDBBE98EC52C2DCEB32A0AAEA8B7EFCE6 110038~|~1~|~2~|~02/S5K~|~Plan split for resurfacing on SR-108 from SLM 17.619 to 18.726~|~05 - 4R Maintenance - Resurfacing~|~D6E4B1E3B9F6B28BCD9E7CBF5ED0A8188BF61DF9 122182~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded enhanced crossings.~|~21 - Safety~|~4B7CC94BFDB9174C26550D2CDB56D6E11D47537D 110213~|~1~|~1~|~01/SAE~|~Rebuild the existing signals at the SR 747/Muhlhauser Rd and SR 747/Port Union Rd intersections.~|~21 - Safety~|~18AD3F684871B0085258AC61F0A1F17D82A7582F 127076~|~1~|~1~|~01/NFP~|~Plan split for district wide mowing contract~|~99 - State Preventative Maintenance~|~D3A20C796BF6879697C61873675C2E657A5C30F7 114610~|~1~|~1~|~01/NFP~|~Plan split for lighting maintenance~|~21 - Safety~|~48DFCF0B42F413BF28424FAD0B8B18C1169E9D97 114610~|~1~|~2~|~02/NFP~|~ITS Plan Split~|~21 - Safety~|~8FC660CE3A47DC97488A4375C23F5EAB9D4CB617 108627~|~1~|~1~|~01/NFP~|~Wood County officials are proposing major improvements to Tracy Road both 1,650? north and south of SR795 that would include widening and realigning the road and signal modifications at the intersection~|~01 - New Construction~|~AB0BE5D9BCDDE738821BC28F69D304E8795E75E6 96080~|~1~|~1~|~01/NHS~|~District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3000362 GUE-US22-17.01 Intersect: Us 22 Over Salt Fork Creek; Not BR Eligible for Rehabilitation: Length=165 SD/FO(0) SR=99.1 DSR=6; GUE-US22-15.12 Intersect: Over Beeham Run; Not BR Eligible for Rehabilitation: L = 125, SD/FO = 0, SR = 99.1, DSR = 7~|~13 - Bridge Rehabilitation~|~09DD01005F95F5885B41CB462D5D61B3DF39FCBA 126227~|~1~|~1~|~01/BRF~|~Plan split for Federal State Exchange Bridge Replacement. ~|~10 - Bridge Replacement~|~BF3B06FB17A38F2D664CE1244B21A19E2BCA0A8A 99010~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - ODNR Parks Project - 4BF7 (100% State) - No CAP - Replacement of 27 drain pipes at various locations within Salt Fork State Park.~|~44 - Other~|~13EFDDEF0F23EC4FD540636A5E38FA0F3F7641C8 87028~|~1~|~1~|~01/SAF~|~Maintenance contract for highway lighting in District 8 for FY2014. This plan split is for work in District 8.~|~21 - Safety~|~46F757BE93EC257C1FDABC48BF97F598923E2129 87028~|~1~|~2~|~02/SAF~|~Maintenance contract for highway lighting in District 7 for FY2014. This plan split is for work in District 7.~|~21 - Safety~|~C61D0939A81544BDF330802093B320000B650910 111306~|~1~|~1~|~01/MPO~|~Stebbins to Prouty - MPO funded plan split~|~04 - Reconstruction - No Added Capacity~|~E1EC95C363409735E0AC1D49FE4CBA9A5989C095 111306~|~1~|~2~|~02/SAE~|~Prouty to Western - Plan Split for 100% Safety funded scope items to enhance pedestrian and bike related improvements between Western and Prouty.~|~21 - Safety~|~6F9A02DF45417447933113D95B5CE7F9A97C251F 92424~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~4B1EDB433C950FF518D8115B566F294F0AB99FBA 119386~|~1~|~1~|~01/S>2~|~Safety and pedestrian Improvements~|~21 - Safety~|~B3C9AABF32982B1215F78590E16A698333DE4145 116714~|~1~|~1~|~01/NFP~|~Culvert replacements and repairs.~|~04 - Reconstruction - No Added Capacity~|~103A5155172D7F7EF9856E711C6ED3911FB201C9 85109~|~1~|~1~|~01/NHS~|~general system resurfacing; HAS-250-14.04 to 17.73~|~05 - 4R Maintenance - Resurfacing~|~98900E7B87BB22A821E0AA4D3EF94F9A54E78AD8 107697~|~1~|~2~|~02/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds.~|~~|~CDEFA9EB6EF0C6AFB7C99523B72E5E08875F7EC2 107697~|~1~|~1~|~01/STR~|~Resurfacing in Defiance County. All resurfacing in this project is in this plan split. Funding is district preservation funds (80% 4PF7 and 20% 4PS7). No local funds~|~~|~2302B5B44969E40AE0C07744E7059CE4E1CFD4CC 98398~|~1~|~1~|~01/S5K/GENE~|~Resurfacing, urban paving in the City of Geneva.~|~~|~F65BB350B5A3BD48F736B372001EF6EB78B798D8 98398~|~1~|~2~|~02/S5K~|~Resurfacing.~|~~|~C872E1B45008476C5439DF9808F8352969508F97 98398~|~1~|~3~|~03/STR~|~Resurfacing.~|~~|~B6D54EBEBDFB168CFEFCC9CA109BDB6B05452A89 98398~|~1~|~4~|~04/IMS~|~Minor bridge work.~|~~|~B0E3C3C4488067314122A970FF3F3E21F93DE67A 98398~|~1~|~6~|~06/STR~|~Bridge preventive maintenance.~|~~|~672BCF03284CF43143F0E4A16281A5FE4F6D34C4 98398~|~1~|~5~|~05/S5K~|~Bridge preventive maintenance.~|~~|~A451B652DC90CF7C9277F3F92DFECA1CDA149EF1 81468~|~1~|~1~|~01/STR~|~REhabilitate Bridge CLE-756-0013. Replace concrete deck and provide pier protection.~|~13 - Bridge Rehabilitation~|~DD42BF95801E78B215D3B45F8ECC07A9F6409BD1 107119~|~1~|~1~|~01/SAF~|~Work eligible for safety funding~|~21 - Safety~|~E6BCF18D5318AA27EE4BC29EC34BA69367C1E006 100866~|~1~|~2~|~02/STR~|~SCI 140 6.84-11.42~|~05 - 4R Maintenance - Resurfacing~|~9B61D78760AAA72A7641DDDA076337D3D6AFB9D0 100866~|~1~|~1~|~01/S<2~|~SCI 140 0.60-6.84~|~05 - 4R Maintenance - Resurfacing~|~C2396553A2D523E83737660C10B14971F8A2BDFC 88722~|~1~|~1~|~01/CMQ~|~State Route 63 from Yankee Road to Gateway Blvd. OKI Project involves installation of a traffic responsive signal system with traffic management capabilities including: interconnection of signals via fiber optic cable, video detection, emergency vehicle pre-emption, PTZ cameras, LED signals, illuminated street name signs, and pedestrian improvements.~|~24 - Traffic Management Engineering - HOV~|~8A58CB5267867F2C94EA902CEB18138B9F36DE25 114227~|~2~|~2~|~02/NFP~|~RPM replacements.~|~~|~6ED17348D564825664B03EAB7E158B9D1F070CFA 114227~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties.~|~21 - Safety~|~F3BDCB855D215145F47D6A057BBB27136A1489BC 97490~|~1~|~1~|~01/SAF~|~Pavement marking project with centerline and edge line striping. Various routes and sections in Athens County. Funded 100% federal.~|~21 - Safety~|~6103494BD9C0063B72F225561CFA11682C07C731 117486~|~1~|~1~|~01/IMS~|~Created plan split 1 as a place holder since this project is early in development~|~~|~401C577A523F8D3B6F18A8CC8DAAC859CC070B88 84489~|~1~|~5~|~05/BRO~|~Split for work relocating Windstream.~|~13 - Bridge Rehabilitation~|~86DA75450F67077DD2959C9A26B00186BA039267 84489~|~1~|~4~|~04/BRO~|~Split for work relocating Time Warner Cable.~|~13 - Bridge Rehabilitation~|~AC263B77395991FE320270202A7CC14E841197B2 84489~|~1~|~2~|~02/BRO~|~Split for work relocating the Fibertech Networks utility.~|~13 - Bridge Rehabilitation~|~B75018C8467433F396F4E05E5E79349988E889AE 84489~|~1~|~3~|~03/BRO~|~Split for work relocating the Cox Communications utility.~|~13 - Bridge Rehabilitation~|~C1F4E8F531C7F7516A7FB930986B56613F474D53 84489~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds.~|~13 - Bridge Rehabilitation~|~DAA024423A9DA14929B68E971072B0C08210F6F6 120805~|~1~|~1~|~01/S5K~|~Paving inside the city.~|~05 - 4R Maintenance - Resurfacing~|~BCDAE16515052C0BDF9DC811EF654A6B452F8112 122203~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-71-D~|~~|~06DF4710518E861E6D20B6DF48D0CA2B6619CF92 113154~|~1~|~1~|~01/ENH~|~Replacement of sidewalks on Marion Street in the Village of Chesterhill. Work includes the construction of ADA compliant curb ramps, light fixtures and other enhancements. TAP funded 95% Federal (15% TRC) and 5% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~51A8BEFC0FCA6931C21A70449BC03D4946949260 106295~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties.~|~21 - Safety~|~30EFB96F7782999DD913FB2B76195A362F244F74 121197~|~1~|~1~|~01/S5K/ASHT~|~Pavement reconstruction.~|~04 - Reconstruction - No Added Capacity~|~11820B0F6FF6C41373DC55DD400F60CB77022002 101304~|~1~|~1~|~01/S<2~|~Madison St in Port Clinton~|~04 - Reconstruction - No Added Capacity~|~9E1925959F592DFFC39C68E08B4D7CECC72F00C3 101304~|~1~|~2~|~02/NFP~|~Water and Sanitary lines.~|~04 - Reconstruction - No Added Capacity~|~F29FFC3B522FE81EC93F053290D6DE097F13AC06 110925~|~1~|~1~|~01/SAF~|~Improve SR 3 by resurfacing, widening, and restriping between Minerva Park Rd and Corporate Dr.~|~21 - Safety~|~AF14F7D1461DDB25ECFA208895778C22DA66264A 110925~|~1~|~2~|~02/S>2~|~Items associated with resurfacing SR3 North of Minerva Lake.~|~05 - 4R Maintenance - Resurfacing~|~C496AA50DD32B2678B0902836A0C0C5AAEFC2863 87215~|~1~|~1~|~01/BRF~|~"01/BRF/BR/GUER" - Guernsey County bridge replacement project on TR364 over Wills Creek. CEAO federal max of $1,770,400~|~10 - Bridge Replacement~|~C0490CB8FC1E782EB1163C628E1CDE9CDCF8D43B 101742~|~1~|~1~|~01/STR~|~Resurfacing project of HOC CR 33A 3.97-5.17. Work includes storm water utility improvements. Funded 95 federal/5 local.~|~05 - 4R Maintenance - Resurfacing~|~6F09CE2DD41E2A29A51870071D742A63F63FC46A 105618~|~1~|~1~|~01/STR~|~LUC-295 plan split~|~05 - 4R Maintenance - Resurfacing~|~6844FC65C0BC355D0D11B921EEC80E64FA500393 105618~|~1~|~2~|~02/BRO~|~Plan Split for LUC-295-2371 bridge~|~47 - Bridge Preventive Maintenance~|~C50B1E06E3F2FBA475577EB6399740FAB6E5FF1A 101738~|~1~|~1~|~01/STR~|~Culvert replacement HIG 28 9.25~|~04 - Reconstruction - No Added Capacity~|~C01ED170FA069EB3542B7A32CDC46CA0062E6AAD 116301~|~1~|~1~|~01/NHS~|~Chip seal in JAC.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~744C6D62016A124135A5BA6B3D1BB2A0FE19301A 75911~|~1~|~1~|~01/IMS~|~Crack Sealing on the Priority System for FY2013~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9A9C078ABDE630A9121D01C8565A6FA0A98507A8 91021~|~1~|~1~|~01/SAE~|~Guardrail repair various locations~|~21 - Safety~|~62E60C388C67A8093AEAA953FBFC6620259CACB3 117015~|~1~|~1~|~01/MPO/CIN~|~Construction of sidewalk on the south side of Dutch Colony Drive from Winton Road to Winton Ridge.~|~28 - Facilities for Pedestrians & Bicycles~|~3D6A5FE195A4E2519398AA3D73B94A9A06CBCCB5 107844~|~1~|~1~|~01/NFP~|~Work on various culverts. District preservation funds.~|~17 - Construction Engineering~|~53B714714AD4F0E4B64C292621604CE3F701CB1A 107844~|~1~|~2~|~02/NFP~|~Work on a culvert that meets the state but not the federal definition of a bridge. District preservation funds.~|~17 - Construction Engineering~|~3774F231F7C73FB9D7D67075C29C18C0C94297C6 105251~|~1~|~1~|~01/NHS~|~Plan split for bridge painting work.~|~47 - Bridge Preventive Maintenance~|~21509D4515F5D37284E8634EE9201377CF8F90BB 86764~|~1~|~1~|~01/SAF~|~Install sidewalks along Euclid from Sycamore Hills to Camargo: and on Thomas from Euclid to Dee, and education/encouragement programs for the SRTS program.~|~28 - Facilities for Pedestrians & Bicycles~|~DD19B1AA39343E4544B29D9887795BEEE34EC1BB 93962~|~1~|~2~|~02/NHS~|~Signal replacement project. Replacement of poles, signal heads, pavement loops, wiring, etc. Signals: GAL 7 25.99, GAL 7 26.07, GAL 7 26.28, WAS 7 25.87, WAS 7 27.01, WAS 60 2.76. Flashers: MOE 7 15.80 and MEG 7 3.71. NHS route funded 80 federal/20 state.~|~21 - Safety~|~45498A33AC27EBD35D13AE3F78E716ADBA696C0A 93962~|~1~|~1~|~01/STR~|~Signal replacement project. Replacement of poles, signal heads, pavement loops, wiring, etc. Flashers: WAS 339 8.57 and VIN 56 3.21. Rural other federal aid funded 80 federal/20 state.~|~21 - Safety~|~AEF9F5406FB318E751BFB456478FB049BF7DE6F6 93962~|~1~|~3~|~03/S<2~|~Signal replacement project. Replacement of poles, signal heads, pavement loops, wiring, etc. Signals: ATH 682 5.10 and ATH 682 5.82. Urban other federal aid funded 80 federal/20 state.~|~21 - Safety~|~89773AB2244D35BEBA0178891B5AD80D0E53E679 113849~|~1~|~1~|~01/BRF~|~All work is in this plan split. 80% federal until the cap is reached. Pauling County will provide the 20% match and all funds after the cap is reached.~|~10 - Bridge Replacement~|~19195AE7C54B13BA9F4156C6A2F92D2E2A44FA7D 125593~|~1~|~1~|~01/IMS~|~Slope stabilization on IR 70 in Muskingum County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B9652F7FCA39DD2B89E2DDF6BCAA5CB5FBEDB9B7 121299~|~1~|~1~|~01/S5K~|~All work is within this split~|~47 - Bridge Preventive Maintenance~|~64F4F3A55DF952F9F96FEAA2C2709FA04C0CB6B6 92130~|~1~|~1~|~01/STR~|~resurface HEN US 6 17.24-24.55 - about SR-110 to McClure corp line~|~05 - 4R Maintenance - Resurfacing~|~D7D36C3EBDCFCFDC2FAE40B0D9A1CF25F7BEB00C 92130~|~1~|~2~|~02/STR~|~HEN-65-17.09 to 20.19~|~05 - 4R Maintenance - Resurfacing~|~B65A6BC2DD4046B9D8CBFFDB3CF4D3ABEFDC2199 92130~|~1~|~3~|~03/STR~|~Variuos bridges on US-6~|~13 - Bridge Rehabilitation~|~99D6C03FBB358D23EB6E81DFB3E4996FF5079DE6 92130~|~1~|~4~|~04/STR~|~Bridges on SR-65~|~13 - Bridge Rehabilitation~|~4F5AB5A9FD3AD9ACFA5BF4CCB98DEC160654D2E9 113005~|~1~|~1~|~01/S>2~|~Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the deck, bearings, and painting the structural steel.~|~13 - Bridge Rehabilitation~|~9889E5F793D11872FC060120E56189061D1EC29A 111338~|~1~|~1~|~01/MPO~|~Split for resurfacing work using MPO funding~|~05 - 4R Maintenance - Resurfacing~|~F94AB501EF81AE128326DA525114A4C3A09F82D1 93569~|~1~|~1~|~01/NFA~|~Demolition of the rear of the annex building at the district complex. Radio Room area.~|~44 - Other~|~6A0B386742529E959CCD86DBFFDF5252FBF8304B 105446~|~1~|~1~|~01/NFP~|~Microsurfacing LOR SR 58/ ERI SR 60 / SR 301~|~05 - 4R Maintenance - Resurfacing~|~2A5B8980F9C327903071B9A885A63E133D3F4E55 105446~|~1~|~2~|~02/NHS~|~Microsurfacing LOR-SR-57~|~05 - 4R Maintenance - Resurfacing~|~397DA491866F32D6CEF67B8C53760CD12C4D85A1 112551~|~1~|~2~|~02/S>2~|~Plan split for the large urban section of CLE-133~|~05 - 4R Maintenance - Resurfacing~|~D729F3A1F713699990E68A8831D86E63F3061684 112551~|~1~|~3~|~03/STR~|~Plan split for MI funded edge replacements~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3F5D57F5E0E38391FF52261A6A8FA47550B740AB 112551~|~1~|~1~|~01/STR~|~Plan Split for the rural portion of CLE-133~|~05 - 4R Maintenance - Resurfacing~|~79026C16F7C1DC8785E072BC2128817A8A5AEBAD 94293~|~1~|~1~|~01/S<2~|~Replace signals at the intersections (3) of SR-747 with Fountain Avenue, Sharon Road, and Washington Avenue.~|~21 - Safety~|~54AA5254CC6F97BAA3801F3C41238F653C93C78F 114737~|~1~|~1~|~01/NHS~|~FY 25 Overlay~|~05 - 4R Maintenance - Resurfacing~|~7BFD1D51D538B1D2C708C4B44D3A073D92F6E348 88489~|~1~|~1~|~01/SAE~|~100% SRTS funding up to federal max to construct sidewalks~|~28 - Facilities for Pedestrians & Bicycles~|~6680809C48017B6DB9E3C553A38EECE1FE00E380 124042~|~1~|~1~|~01/NHS~|~Resurfacing work on Berea Freeway from Sheldon to Eastland~|~05 - 4R Maintenance - Resurfacing~|~9D9972A7643B1DDD69AE5F60551E8FED0BF01D4F 124042~|~1~|~2~|~02/BRO~|~Plan split for bridge work on federal bridge on NHS route~|~47 - Bridge Preventive Maintenance~|~83E0C1CCCCE57CE2E6971A88A44EAEF975B13C27 101839~|~1~|~1~|~01/SAF~|~Guardrail placement project using CSTP funds. 100% Federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0CBA7140B22321696278145BEA2F8C7B5B13A8D0 115344~|~1~|~1~|~01/SAE~|~USBR signage installation along USBR 25 and 30~|~21 - Safety~|~A8085D6D714B74F6D5FA5559670A3F6AD0E7EDEA 119414~|~1~|~1~|~01/NFA~|~CEAO LBR bridge replacement~|~10 - Bridge Replacement~|~812C20F4F638209A08805D02BA634D70F6BD2532 111309~|~1~|~1~|~01/BRF~|~Guernsey County Engineer project to rehab bridge GUE-CR33-0.70 (SFN 3033880). 4C87 - See Cap comments~|~13 - Bridge Rehabilitation~|~5FFEEA5F9E3D5F416A4C632A96D2A4FD3D0019F3 105577~|~1~|~1~|~01/STR~|~The rural portions of MAR 309, MRW 61, MRW 95AC and MRW 95 and the associated bridges~|~05 - 4R Maintenance - Resurfacing~|~6BAB906D92CE4C8BF4361FC9751BA18CE35BCF3A 105577~|~1~|~2~|~02/NHS~|~Urban Portion of MAR-309 and MAR-95 and the associated bridges~|~05 - 4R Maintenance - Resurfacing~|~314FD807C76D9129D5708BFA8E7C968DE45E653D 99846~|~1~|~1~|~01/MPO~|~Fudning to cover construction costs of signal interconnect installation at 19 locations in New Albany.~|~44 - Other~|~FD8341610EE68857A7E68E6A3B888315E9A23C09 122191~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-74-A~|~~|~B6C6B9BF48773893AF98039E70B5BBBE8662DDC7 96693~|~1~|~1~|~01/NHS~|~Plan Split for the items paid at 80% ODOT and 20% City. This includes SR 264 between SLM 8.9-10.62 inside the City. Items of work should include planing, new asphalt, and final striping.~|~05 - 4R Maintenance - Resurfacing~|~73B8D0E846438B8AA6D986AB5D99E7DBF28D07C5 96693~|~1~|~2~|~02/NHS~|~Plan split for items of work paid for at 100% City costs. This includes SR 264 between SLM 8.9-10.62 inside the City. Items of work included in this split are pavement repair, curbs, curb ramps, and temp. striping.~|~05 - 4R Maintenance - Resurfacing~|~046FBC8C82C62874E348058BEE39F329DC0648BE 112805~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~~|~8D7ED1CD05027DCB2BDB68A2FEF1B9191BFABB47 112805~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 45 from 15.27 to 17.39 and ATB SR 307 from 3.22 to 8.49.~|~~|~90B198CD0AC550CC58CDDA8703600ADB140189DB 123493~|~1~|~1~|~01/NFP~|~FY31 guardrail.~|~21 - Safety~|~60FACF6A7E3406B66E5A8AAADC01C248876AA7BD 117595~|~1~|~1~|~01/NFA~|~Bridge replacement project .MEG TR 109 0.58, SFN 5342554 and MEG TR 126 0.58, SFN 5342600. Funded 100% Federal.~|~10 - Bridge Replacement~|~2DB7FFC871F7C7B52B2B25683CA57597059FD3C9 114580~|~1~|~1~|~01/NFA~|~Landslide repair project. VIN 356 1.34. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5A453D08776AE82DA303A5D537F5E61C0A7FC62C 112285~|~1~|~1~|~01/BRF~|~Bridge replacement on ADA-101-1.39 (SFN 0134775).This is a Ohio Bridge Partnership Program project.~|~10 - Bridge Replacement~|~2C629E39EDA2C640AAE68C320F60C54643048C3C 84600~|~1~|~2~|~02/S<2~|~Resurfacing of SR164. State Route 164 from 0.00 to 0.66.~|~05 - 4R Maintenance - Resurfacing~|~099F670D1DDB5D1DFC8B7B4EE19DF819442BCB8A 84600~|~1~|~3~|~03/S<2~|~100% Local items requested by the City of Columbiana.~|~05 - 4R Maintenance - Resurfacing~|~4EF9D575E6D9F6467B190F8ECDA7C29BA876D99D 84600~|~1~|~4~|~04/STR~|~Miscellaneous bridge work to eight rural structures. 5003121 District 4 SMAHSR00164**C : 5003156 District 4 SMAHSR00164**C : 2.850 5003431 District 4 SMAHSR00165**C : 5.780 5003482 District 4 SMAHSR00165**C : 9.030 5003520 District 4 SMAHSR00165**C : 9.130 5003555 District 4 SMAHSR00165**C : 11.5005003571 District 4 SMAHSR00165**C : 11.700 5003601 District 4 SMAHSR00165**C : 14.440~|~13 - Bridge Rehabilitation~|~7A9BF3D56F7A2E3361021EFDA66DF3D445BEA369 84600~|~1~|~1~|~01/STR~|~Resurfacing of SR164/165/14T. State Route 164 from 0.66 to 4.07. State Route 165 from 5.46 to 16.64. State Route 14T from 0.00 to 0.91.~|~05 - 4R Maintenance - Resurfacing~|~A690BFD6E8C408E28F616514AC93A56823B4D4B2 113936~|~1~|~2~|~02/NFA~|~Resurfacing the loop driveway and parking area of the Parry Park Museum in Woodsfield. Monroe County Park District. ~|~05 - 4R Maintenance - Resurfacing~|~177B4543893AE25AC63CCF26D880E9A3D3064BE4 113936~|~1~|~1~|~01/STR~|~Asphalt overlay resurfacing. MOE 537 0.00-2.69, MOE 800 17.92-26.04, NOB 83 4.55-6.74 and GUE 83 0.00-0.71. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~E979AEDE05204270D640A4F8036C42B15D9914A0 113936~|~1~|~3~|~03/SAF~|~Safety widening on NOB 83 4.55-6.74 and GUE 83 0.00-.71. Safety funded 90% Federal/10% State.~|~21 - Safety~|~5592817AEC4895F28002F3B1491A43B4D3A1F734 116866~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~66E4A69E37BF82A2AFFCC078CE76E9CDAE84F06D 125325~|~1~|~1~|~01/STR~|~Plan Split 01/STR~|~05 - 4R Maintenance - Resurfacing~|~05372C269A177141BD14837FA508DF53470AF48C 119669~|~1~|~1~|~01/IMS~|~Split for ramp work~|~04 - Reconstruction - No Added Capacity~|~773CC51B02ED5F7FD13BD8965FA77F9478B56073 119669~|~1~|~2~|~02/IMS~|~Plan split for preventative maintenance work on ramp bridge during pavement rehab~|~47 - Bridge Preventive Maintenance~|~77B4346F48CF03B02DDE9B30C1E3C3EADBE3B3ED 103962~|~1~|~1~|~01/STR~|~Place epoxy overlay on deck of PIC-361-4.31~|~~|~A9F49A1774B46C0F38EB9F767F3593CA350B9984 95607~|~1~|~1~|~01/CMQ~|~MORPC CMAQ & STP & Columbus funding for widening of Lazelle Rd from Sancus to WG~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~32B86B016F79EBF2C3D9DC337092DC272DED2EAC 87121~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a microsurfacing treatment. GAL US 35 0.00-3.80. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C514B23D65286C8F1B28E9A43463EED4966159D1 99896~|~1~|~1~|~01/MPO~|~Resurfacing of W Main St from 195' west of Bonnieview to Union Ave (SR 183).~|~05 - 4R Maintenance - Resurfacing~|~0BEA0998ED2D13EE23C2FA9BC7C370A36E4FC6CC 109099~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 329 7.32. 100% state ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~946540A1CDA573DCDE259834A6A1D6464C4637DC 102275~|~1~|~1~|~01/SAE~|~Various county routes.~|~21 - Safety~|~B6209DAD2EB201FDAD4A49182B71E2D61F26A812 100843~|~1~|~1~|~01/STR~|~ADA 136 20.40-25.14ADA 247 18.17-23.98~|~05 - 4R Maintenance - Resurfacing~|~F16AE2FB1FB08FB1A50A8F3EF64C298DD7716260 100843~|~1~|~2~|~02/STR~|~Bridge PM.~|~17 - Construction Engineering~|~4A14C9369358E3B78A75784D5C605380B3AE2CF4 102273~|~1~|~1~|~01/STR~|~Concrete overlay and deck edge repair on NOB 145 0.79, SFN 6101771. Work also includes concrete overlay on NOB 145 2.87, SFN 6101801. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~C58F9EFEF76A4FEFBEC0A7E13E6C4AFD47AB24D0 100801~|~1~|~1~|~01/IMS~|~Rehab bridge with concrete overlay, barrier and decorative fence alternative.~|~13 - Bridge Rehabilitation~|~78CCFDC28324C28BCC3EFBCA88D8E3865CD6995C 123807~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~E47A50657FAF7A20F203828CA0F6533251F2DFB4 106296~|~1~|~1~|~01/SAF~|~Construct an RCUT design at the intersection of US 127 & Kruckeberg RD.~|~21 - Safety~|~4E148948EAB537DB27F622F80B98B8356B2563D4 98978~|~1~|~1~|~01/STR~|~CR-6~|~05 - 4R Maintenance - Resurfacing~|~301EE78A3203A77C1293B1C03C7D29D35B54CFD0 114415~|~1~|~1~|~01/NFA/HAS~|~Pavement rehabilitation project funded up to a maximum of $500,000 at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~CAE33E7F55CE21757541E409976BD919C98475B7 112893~|~1~|~1~|~01/MPO~|~Construction of a shared use trail along a former rail corridor from just west of Marburg Avenue, eastward through Ault Park, and along Old Red Bank Road to tie into the existing Murray trail.~|~28 - Facilities for Pedestrians & Bicycles~|~BFFB8CF822BF416BFFD32D0E23298783F8BC8829 116666~|~1~|~1~|~01/NHS~|~added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A220BFFE45A257B0FB0CD4040B68B7F7A0745376 81055~|~1~|~2~|~02/S>2~|~Resurfacing and re-striping of State Route 193 from Park Avenue to Lexington in the City of Youngstown, Mahoning County, Ohio.~|~44 - Other~|~850596F6C1008A94B06A6831DA1C9D13B616576E 81055~|~1~|~1~|~01/ENH~|~Enhancement items (median planter, etc.) associated with State Route 193, from Park Avenue to Lexington, in the City of Youngstown, Mahoning County, Ohio.~|~44 - Other~|~C31ADDB560EEFE02C91D97670C10AA55E7A76525 88524~|~2~|~3~|~03/STR~|~For enhancement work in downtown Pemberville on WOO-105 from 8.81 to 9.76~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4752EF02E0DFB7AE2E01140D928D42B5785C5AF9 88524~|~1~|~2~|~02/STR~|~Bridges on OTT-51 @ SLM 0.22 and @ SLM 1.44~|~13 - Bridge Rehabilitation~|~4919C0810A159E7E524B1AB66904DB00B4D5D359 88524~|~1~|~1~|~01/STR~|~resurface OTT SR51 from 0.00 to1.42; WOO-SR199 from 6.24 to 6.81;and WOO-SR105 from 8.81 to 9.76.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~72A898EB03291EF7F654FAA5F4823E9D9ADABF82 107392~|~1~|~2~|~02/NHS~|~Split for HAS-9-17.05 location.~|~04 - Reconstruction - No Added Capacity~|~684473362E317333A4F7E293B2EEF8D32D5871C8 107392~|~1~|~1~|~01/STR~|~Split for HAS-9-0.15, HAS-9-15.53, and HAS-646-1.12 Locations~|~04 - Reconstruction - No Added Capacity~|~96C561EBBCF3B67B1B8C335A7F7FB33409D0E938 92687~|~1~|~1~|~01/STR~|~This split is for resurfacing on SR 67 from 1.58 to 15.00. This section of SR 67 is a rural non-NHS route outside any urban area.~|~05 - 4R Maintenance - Resurfacing~|~30E1C4F147E95D925E6DB46B1289F70391F79828 92687~|~1~|~2~|~02/S<2~|~This split is for resurfacing on SR 67 from 15.00 to 15.07. This section of SR 67 is an urban section of a non-NHS route. It is inside the Kenton Urban Area but outside the City of Kenton. Therefore, there are no City of Kenton funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~A4583F32BD2528284E6210453C6BD7D6F1C1AE5D 116875~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~2BD56B06F375D6AB4CC801050D0B1D7D23020D37 100099~|~1~|~1~|~01/NFA~|~Pavement full depth reclamation. MOE 26 23.96. Not on any federal aid system. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A97A0CD4259ED627F8B19CDDD3B8B12B2504F316 115290~|~1~|~1~|~01/NFP~|~Guardrail repair/replacement.~|~21 - Safety~|~82D73B81D05EA546FEB80342FA36ADFA7D223C25 95250~|~1~|~1~|~01/NFP~|~Culvert replacements on TRU-SR5-34.04, TRU-SR88-6.92, and TRU-SR305-18.93, in Trumbull County, Ohio.~|~44 - Other~|~7BD7EACEB501EE42C26A5EDF5F80B3E6599B3240 91400~|~1~|~1~|~01/STR~|~General System Paving and in rural func class areaFAY-62: 0.00-10.76~|~05 - 4R Maintenance - Resurfacing~|~87F5F6E5AC30A398279338FDF62A94D07D664FEA 91400~|~1~|~3~|~03/S<2~|~WCH urban paving and in WCH urban func class areaFAY-62: 13.17-14.42FAY-62D: 0.00-0.95~|~05 - 4R Maintenance - Resurfacing~|~8B3320E20C4A4573E319DC956BEA771092FBD150 91400~|~1~|~2~|~02/S<2~|~General sytem paving but in WCH urban func class areaFAY-62: 10.76-11.85, 14.42-14.55~|~05 - 4R Maintenance - Resurfacing~|~F5E44F1253FF2966C9E4EF8BBD263BA352108583 103653~|~1~|~1~|~01/S<2~|~Mill and resurfacing within the City of Riverside.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F4002FFFBE7074086FEAC3F2BA554167321C5A3E 114766~|~1~|~1~|~01/NHS~|~JAC 35 Double Micro~|~05 - 4R Maintenance - Resurfacing~|~79CE8641F0AF624328E32784A00DEE8C5CAC7766 114766~|~1~|~2~|~02/NHS~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~808CB85AA1DC016B0213916ECC46EB8E05965013 102276~|~1~|~1~|~01/SAE~|~Various County roads.~|~21 - Safety~|~82256E8E50CB3AF9A51D495D41F6CCD4B5895C8F 101233~|~1~|~1~|~01/STR~|~Plan split for resurfacing HEN-281~|~05 - 4R Maintenance - Resurfacing~|~57BB131532AB006F5841E28EA2E3C221651C8518 124455~|~1~|~1~|~01/NFA~|~Created for TID Involvement. ~|~44 - Other~|~99F1FD4BF0D5721EEE224FA265F9F5DCB4A91E23 116743~|~1~|~1~|~01/NFP~|~All work in this plan split using 100% state funds SAC 4PS7.~|~13 - Bridge Rehabilitation~|~5DD226627D6F6C9050DF17D74A8433037979D0E7 121829~|~1~|~1~|~01/NFA~|~installation of two EV charging stations at Metroparks VOA~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~1BA2AAFAA674174F0A62D5149CADC56D0D68C3F3 127178~|~1~|~1~|~01/S5K~|~Small City funded scope~|~05 - 4R Maintenance - Resurfacing~|~04ED04FB30315D807851FC76EA7FABD5995E6210 91406~|~1~|~3~|~03/S<2~|~Plan Split for the section in the small urban area. This includes route PRE-40 between SLM 0-1.1~|~99 - State Preventative Maintenance~|~81C2A71AB39556FB686503BFB002442973F04283 91406~|~1~|~1~|~01/STR~|~Plan split for the rural sections. This includes routes BUT-73 between SLM 4.65-7.32 and SLM 11.24-11.58, BUT-503 between SLM 0.97-6.05, CLE-131, GRE-42, PRE-35, and WAR-350~|~99 - State Preventative Maintenance~|~83269380A748E5C53C455E84CA3E23A2D1639F2C 91406~|~1~|~2~|~02/S>2~|~Plan split for the sections inside the large urban areas. thse routesa re BUT-73 between SlM 9.89-11.24 and BUT-503 beween SLM 0.51-0.97~|~99 - State Preventative Maintenance~|~44622AFC53F2009CB36089633812F91358977B9D 124860~|~1~|~1~|~01/NFP~|~Crack sealing various routes throughout District 4.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CAC18A924EE06771B7F241F7E0F30FB4CB5F62BF 126268~|~1~|~1~|~01/IMS~|~Locations to be determined~|~47 - Bridge Preventive Maintenance~|~F691C4B09295240D92595E80AF34A04456FD8E21 116867~|~1~|~1~|~01/CMQ/WARR~|~Pedestrian bridge replacement in Packard Park over the Mahoning River.~|~10 - Bridge Replacement~|~9E2D17FE1314DA18A9CE9DE5C76D345EA21C800D 87887~|~1~|~1~|~01/IMS~|~Extrusheet sign replacement project. NOB 77 0.00-18.92 and WAS 77 0.00-17.64. Funded 90 federal/10 state.~|~21 - Safety~|~DD1CCD412EB9E8D4DE2DC129B2C758461B6C5AD7 87887~|~1~|~2~|~02/NHS~|~Extrusheet sign replacement project. WAS 50 0.00-3.34. Funded 80 federal/20 state.~|~21 - Safety~|~1D8E11BCE5C01C11C57B3159457779C0B25ADFB3 114128~|~1~|~1~|~01/IMS~|~Plan split for bridge deck replacement work~|~13 - Bridge Rehabilitation~|~746B40B9A64906350F331682860E9AE6F3E726A3 114325~|~1~|~1~|~01/BRF~|~Removal of existing overhead structure, not being replaced.~|~10 - Bridge Replacement~|~A6A2723601C49B64B133F27E9417FA3B6477C13F 88178~|~1~|~1~|~01/ENH~|~Plan split for the intersection re-alignment work.~|~21 - Safety~|~30CC4DEC41C715E82E10535712AFF8CC09D11054 92615~|~1~|~2~|~02/IMS~|~Resurfacing of existing pavement~|~05 - 4R Maintenance - Resurfacing~|~E125D99AC3BBC30D580E6F67032016B9110AC03F 92615~|~1~|~1~|~01/IMS~|~Construct northbound CD lanes and ramp modifications~|~01 - New Construction~|~D6D0CE50B2DFF7FE7D24048B7B3CA8818B5B8B27 92615~|~1~|~3~|~03/SAF~|~Special pavement markings for MOT~|~17 - Construction Engineering~|~84DCC558B2D162DDBC9390B19403B4EFC9629F96 114239~|~1~|~1~|~01/ENH~|~Build Construction funds~|~28 - Facilities for Pedestrians & Bicycles~|~B3C901A3320B34A5C8E2B8B167B5808A318D7BF1 114239~|~1~|~2~|~02/ENH~|~Plan Split for 100% Locally Funded Scope Items~|~28 - Facilities for Pedestrians & Bicycles~|~26C7AE3415E17FF55E7B39F4304C57842EB594C6 114239~|~1~|~3~|~03/ERD~|~100% local plan split for LPA to reimburse FHWA $210,373 for Buy America non-compliant materials.~|~28 - Facilities for Pedestrians & Bicycles~|~EA47E49E8F5567EF494A3DF13F5579D0325F162B 102951~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~10 - Bridge Replacement~|~B40F1F105579B659287B54DC26838A935E25C489 104004~|~1~|~1~|~01/NFA~|~The City will construct approx. 1,760 feet of two lane road within the Van Aken District Bounded by Warrensville Ctr Rd on the east, Farnsleigh Rd on the north and west and Chagrin Blvd on the south.~|~01 - New Construction~|~E106FA7E1BF24C5CDF2DE1C660E7615B0AD1DD6E 102705~|~1~|~1~|~01/NFA~|~Bridge repair on Non-Federal Aide bridge.~|~13 - Bridge Rehabilitation~|~4EEBCE64616BD032B3602ADA4CDAEDB018A38C9B 102705~|~1~|~2~|~02/STR~|~Bridge rehab on rural route bridge.~|~13 - Bridge Rehabilitation~|~018B355EEBCECD5018BE7514F3889F5EE77825D2 123227~|~1~|~1~|~01/STR~|~310' landslide repair on SR 556-3.98mm.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~63FA1429B7406AE393F3B0BCA413E2E7795E900B 118610~|~1~|~1~|~01/NFA~|~Split 1~|~17 - Construction Engineering~|~F6E76AAB19BE0421602B2CE461FD6C18A37ECBEC 94676~|~1~|~1~|~01/IMS~|~Remove and replace left deficient structure with new structure. SFN 5503396, MIA 75 1901 L (Rush Creek) and SFN 5503426, MIA 75 1901 R (Rush Creek)~|~10 - Bridge Replacement~|~C6B1546C6E645A9657673C9D828AA16693B78D1A 94676~|~1~|~2~|~02/IMS~|~paving to the North approach slab of the structures over 25A~|~05 - 4R Maintenance - Resurfacing~|~6680364F1ECD9567158DFEC3BB80AC2D50FFC719 94676~|~1~|~3~|~03/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~EBA75FBF5AC2FA65A21692E9BF27820AD0EC846A 94676~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~44 - Other~|~E29DF7B119A08783A956EC22AA9603431976B1A0 97306~|~1~|~1~|~01/NHS~|~Safety Funds-guardrail end treatment replacement on NHS routes.FAY-35, FRA-3, FRA-161, UNI-33~|~21 - Safety~|~8986498272DDA1D5530A328BBE67DADA869482CA 97306~|~1~|~2~|~02/NHS~|~District Preservation funding-other guardrail items upgrade on NHS routes.FAY-35, FRA-3, FRA-161, UNI-33~|~21 - Safety~|~F78DEAB9F0222268E86FB7E0E462CCC19A18BA8A 97306~|~1~|~3~|~03/IMS~|~Safety Funds-guardrail end treatment replacement on Interstate routes. PIC-71, FRA-670~|~21 - Safety~|~1F6D22244955B7BFD9E7EA108A00D6EEB1E8211C 97306~|~1~|~4~|~04/IMS~|~District Preservation funding-other guardrail items upgrade on Interstate routes. PIC-71, FRA-670~|~21 - Safety~|~132BADB5F64ADEDD9EFC4B5A834DDFC254A1DB1A 97306~|~1~|~5~|~05/STR~|~Safety Funds-guardrail end treatment replacement on STP routes. FAY-753, MAD-40, MAD-42, FRA-40, FRA-710, UNI-245~|~21 - Safety~|~3A32C39E99E76CF4824B13DC19AC3A8AC09EB780 97306~|~1~|~6~|~06/STR~|~District Preservation funding-other guardrail items upgrade on STP routes. FAY-753, MAD-40, MAD-42, FRA-40, FRA-710, UNI-245~|~21 - Safety~|~1CF6C0076CDC48A4850211F4CB86309158DDE4D0 108372~|~1~|~1~|~01/MPO~|~Resurfacing of 2nd St SW from Hudson Run Road to Wooster Road, Wooster Road North and Norton Road in the City of Barberton, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~540B1F91072E56562452B402037E1941CD1ED273 116412~|~1~|~1~|~01/IMS~|~FY 2028 drainage block PID.~|~44 - Other~|~FFAC906DEF8920521613EFFAE2633A3D865AF35F 87124~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project using an asphalt overlay treatment. NOB IR 77 1.56-6.44 and WAS IR 77 0.00-6.63. Interstate maint. funds, Federal 90% and State 10%.~|~05 - 4R Maintenance - Resurfacing~|~22B799EC21EDE68475D8445FB32A613E0AFC64D6 114564~|~1~|~1~|~01/NHS~|~Remove and replace median concrete barrier and highway lighting~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C060E2129A05B3CBD2C5E2D225C3ABCB1A33947 110961~|~1~|~1~|~01/NHS~|~Resurfacing on the NHS system.~|~05 - 4R Maintenance - Resurfacing~|~8E522E5DFA8B1CCF9011E39D54B78960C4575B41 103802~|~1~|~1~|~01/NFA~|~The County is constructing improvements to CR 10 from SR651 to south of TR205. The roadway improvements will consist of approximately 6.5 miles of full depth reclamation on CR10.~|~01 - New Construction~|~60B07F311BC485871BFBD28829641F11395E8AFB 114236~|~1~|~1~|~01/IMS~|~Building demo~|~44 - Other~|~03882D6F8C2BECF065ABDC5422131CA24D4DCA40 94400~|~1~|~1~|~01/NHS~|~80/20 4PF7/4PS7 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5E79A8A7D0BD4353085B9A34EDF981DEB0680FBA 94400~|~1~|~2~|~02/NHS~|~Bridge Repairs~|~13 - Bridge Rehabilitation~|~2503A96BE7086C4026A8DD03B212BB1298FF28AD 107955~|~1~|~1~|~01/IMS~|~Landscape maintenance and upkeep at the I70/I75 interchange~|~31 - Landscaping & Other Scenic Beautification~|~4191AF784FC850C1D625010B63E09ED0F4A05B9A 117393~|~1~|~1~|~01/ENH~|~Sidewalk project utilizing TAP (4B37) Federal funds at 95%.~|~28 - Facilities for Pedestrians & Bicycles~|~4DDF88438E55996A0D0E477E584C8667A76BC558 117393~|~2~|~2~|~02/ENH~|~Material Cost Reimbursement with Non-Federal funds.~|~44 - Other~|~DD11CF9A73288E6550531322268A34D8E033B94F 112714~|~1~|~1~|~01/STR~|~Replace deck and paint MRW-095-8.12~|~13 - Bridge Rehabilitation~|~EF10960F60122695FC98F93D46CF1FBD461DCB92 98755~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 29 0.17, SFN 5342171. Not on any federal aid system funded 80 federal/20 local.~|~10 - Bridge Replacement~|~46F7155A0066A2F4265D9F59BE48C08966F8324D 98755~|~2~|~2~|~02/NFA~|~PE Detail Design portion of Design/Build project MEG CR 29 0.17, SFN 5342171. Not on Federal-Aid System, utilizing SAC 4B87 (Local Bridge) at 80% rate and Local Match at 20% rate using TRC. Total = 100% Federal.~|~15 - Preliminary Engineering~|~F137055364237D5ECD6B8D24967AE49B4A1F8A6E 114571~|~1~|~1~|~01/STR~|~Microsurfacing~|~17 - Construction Engineering~|~53D0033B3BEA110891D1C191A9CCCB503D60A88E 82972~|~1~|~2~|~02/IMS~|~For all bridge and approach work related to the following overhead structures: HAM-275-1684 (SFN 3116646), HAM-275-1819 (SFN 3116670), HAM-275-2016 (SFN 3111768), and HAM-275-2027 (SFN 3104710).~|~13 - Bridge Rehabilitation~|~1A45CB2F9FDC000413CC9816EB20A94B016A17FD 82972~|~1~|~1~|~01/IMS~|~Plane, repair, and pave a portion of IR 275 in Hamilton County from east of Colerain Ave. (SLM 16.19) to the ramps to Winton Road (SLM 21.47) Bridge project work for HAM-275-16.84/18.19.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9D65E8C16EAD897FAAA174F5C68DF8E9638E7DC4 110152~|~1~|~1~|~01/IMS~|~Paint bridge superstructure~|~47 - Bridge Preventive Maintenance~|~300CBF1D1D5BD6EF5E51F05A1367B08C2AEC5F3D 110152~|~1~|~2~|~02/NHS~|~Paint bridge superstructure.~|~47 - Bridge Preventive Maintenance~|~F972F27E54B24E5F6793BA3F302FC1B582615C81 111796~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at Norton and Kropp/Grove City Road~|~21 - Safety~|~7E99BE163F307D6D9D7340CE36DE7CD12730A87D 102226~|~1~|~1~|~01/NHS~|~SR-2/SR-269 interchange ramp~|~04 - Reconstruction - No Added Capacity~|~CB8252135AEC73347B99FC6A3E9CD3C3AB14D380 98395~|~1~|~4~|~04/IMS~|~Work on MED-3 structures over I-71 and I-76~|~13 - Bridge Rehabilitation~|~6026A245171534F38E9C125D270A0AD83F8D48EF 98395~|~1~|~1~|~01/S<2~|~Resurfacing MED-003-3.80 to 4.00 S<2 Urbanized Area~|~05 - 4R Maintenance - Resurfacing~|~925321B0F9114DB45C88DFDF67E181297E316E00 98395~|~1~|~2~|~02/STR~|~Resurfacing MED-SR3-4.00 to 8.03 Rural~|~05 - 4R Maintenance - Resurfacing~|~4752EF80B741A45648667FF9F330C4F05D3702AA 98395~|~1~|~3~|~03/S>2~|~Resurfacing MED SR3 8.03 to 8.97 / 9.14 to 9.87 S>2 Urbanized Area~|~05 - 4R Maintenance - Resurfacing~|~2A12C198CD6989AE7CD656ACDF25033037864EB4 98395~|~1~|~5~|~05/SAF~|~Funding for center Line rumble stripes Outside of Seville and Medina.~|~21 - Safety~|~91094D7ABFD945BEFBAE16652F8ABF87FF5899EB 109956~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 1.80. Funded 100% state ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BEF67907A1926AAEFAB31035DFD28481CB032A9B 93351~|~1~|~1~|~01/STR~|~General system paving of MAR-98: 0-17.17~|~05 - 4R Maintenance - Resurfacing~|~7F5FDD30CEFE0C7E6AAE42675FFDC32CE462AE7F 101013~|~1~|~1~|~01/NFA~|~District Pavement Preservation Funding - 4PS7 (100% State) ~|~05 - 4R Maintenance - Resurfacing~|~7686491AA30E2EEEAF4F3051088BD3AF7208D075 101013~|~1~|~2~|~02/NFA~|~District Bridge Preservation Funding - 4PS7 (100% State)~|~13 - Bridge Rehabilitation~|~497D7F225682ECBF7E5E320905E3A30444DCD22F 98362~|~1~|~1~|~01/MPO~|~Resurfacing of Robinson Ave between Bridge West of Van Buren to 5th Street in the City of Barberton.~|~05 - 4R Maintenance - Resurfacing~|~7BA6A83362660B6047567DF307F10390282875AC 100965~|~1~|~1~|~01/STR~|~Landslide repair project. ATH CR 33B 1.57. DSR ATH-002. Funded ER, 80% Federal and 20% Local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A650AFE9310F5CA1CE11470301E43FABFD5A015F 105641~|~1~|~1~|~01/BRO~|~Bridge blanket PID, locations TBD.~|~13 - Bridge Rehabilitation~|~178249A1F2ACC54EA03847E008BA6C8E0EF7ED82 95788~|~1~|~1~|~01/STR~|~From SLM 0.00 to SLM 11.05~|~05 - 4R Maintenance - Resurfacing~|~03E9707E99366543CA090C7EEB180AE5CED60A07 99411~|~1~|~1~|~01/ENH~|~Construct bike lanes on SR 800 on both sides of the 28.44 bridge over the Tuscarawas River.~|~28 - Facilities for Pedestrians & Bicycles~|~ECE10DC7279CE5A82BD645D85B39F9257CF00E17 99411~|~1~|~2~|~02/STR~|~02/STR/OT Plan Split is for the Intersection Lighting related costs of the project. 80% 4PF7/20% 4PS7.~|~28 - Facilities for Pedestrians & Bicycles~|~64123DFB80A304D6539F46BF2F43213BC1149648 121519~|~1~|~1~|~01/SAF~|~Construct Roundabout at the intersection of CR 95 and CR 106~|~21 - Safety~|~3D1CCBEACA2F009F87764726BB34B1B00939BBEB 123758~|~1~|~1~|~01/NHS~|~Plan split for bridge maintenance work on the following SFNs: 3501515, 3501523, 3501558, 6200788, 8707413, & 8707448~|~47 - Bridge Preventive Maintenance~|~7698FB6887565CFAB15A0D9B6542314389C4C3BF 123758~|~1~|~2~|~02/BRO~|~Plan split for bridge maintenance on the following SFNs: 3502384 & 8705240~|~47 - Bridge Preventive Maintenance~|~73C5F79D87083E0C2AB57C3BD84F70C0150C0D9A 126686~|~1~|~1~|~01/NFP~|~ODNR resurfacing~|~05 - 4R Maintenance - Resurfacing~|~66D169BC059CA3F4CE695BB7E321B4BDCC9145B0 99372~|~1~|~1~|~01/IMS~|~SFN 5501687, MIA-75-0043L & SFN 5501717, MIA-75-0043R on TR 42 Ginghamsburg Road - Remove microsilica concrete overlay and install new latex modified concrete overlay using hydrodemolition. Patch pier columns using anodes and SCC (self consolidating concrete). Seal columns with epoxy-urethane.~|~13 - Bridge Rehabilitation~|~947E671E55DAA48755C6742AE966740ED7ABC733 91946~|~1~|~1~|~01/IMS~|~100% State/Maint. Funds for 1 year~|~21 - Safety~|~325B3288663CC187C1364D4E4E9D4D05C6B79D51 93163~|~1~|~1~|~01/STR~|~General system resurfacing of PIC-674: 0-1.22, FAI-674: 0-0.40, PIC-674: 1.22-10.93~|~05 - 4R Maintenance - Resurfacing~|~88F359C4D50BC178EB396CA4F1FDD873B8C634BA 119953~|~1~|~1~|~01/STR~|~added plan split.~|~10 - Bridge Replacement~|~1E6032B9B03E9954EECA433245F5A00832CC6F1A 98693~|~1~|~1~|~01/NFP~|~TR-22 bridge over Ohio Turnpike.~|~21 - Safety~|~627FC49BB05E996B1C278865EC632352FA497A95 106366~|~1~|~1~|~01/IMS~|~Bridge deck sealing on various bridges in D7.~|~47 - Bridge Preventive Maintenance~|~6DD99B0D6F33FB0AE95A74315ED6E9A4FD46F07D 116198~|~1~|~1~|~01/BRO~|~Bridge replacements utilizing CEAO LBR (4B87) Federal Funds at 95% (including 15% CBP credit).~|~10 - Bridge Replacement~|~332B9E3A830F52EBDED304F9BC9848D340976023 102108~|~1~|~1~|~01/SAF~|~Intersection Improvement - Restricted Crossing U-turn~|~21 - Safety~|~A3FE70FB2A1756C92126073C7F896341386719D5 102108~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~3A27747CE4C4760A760F4504A331FD86C7C2A78B 124705~|~1~|~1~|~01/STR~|~Plan split for deck sealing of federally eligible bridge~|~47 - Bridge Preventive Maintenance~|~5F8F695AA1A4778B3662C8FA3F599191C6B61BDE 121065~|~1~|~1~|~01/S>2~|~Bridge Replacement on Cheshire Rd (SFN: 2134195)~|~10 - Bridge Replacement~|~5CB7D91B74E785822D51F8605687D73AF37AB96C 113935~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~46E7441D7FCCB7CE4BE2A115A040EA6A6C7F8122 113935~|~1~|~2~|~02/NFA~|~Created for J&C involvement ~|~~|~EDC1E8572AA65382E725E0AD773FE5F63BB4CD91 85346~|~1~|~1~|~01/S<2~|~"01/<2/OT/CAMB" - City of Cambridge~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4DD24C27B5AFFA3A5FDA297F18BAB6261EAE3BB5 126006~|~1~|~1~|~01/NHS~|~Bin Wall replacement or repair~|~66 - Resilience Improvement - Highway Project ~|~0F9138826CC92141577FFD9F71DEEB5A0E89D35D 93325~|~1~|~1~|~01/S<2~|~Intersections of SR159 & Kenworth Drive, and SR159, Claybourne Heights & Kenworth. Project Description: It is proposed to add a north bound lane on SR159, add a west bound thru-right turn lane on Kenworth Drive, add east bound lane on Adena Drive, and add a right turn lane into the right in right out diveway to Kenworth that is located across from Claybourne Heights. ~|~04 - Reconstruction - No Added Capacity~|~A2288E2A7C1026C5636ACC7B5D5859130B47A5BE 91443~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 327 1101 (SFN 8202311). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~3EF82EF7E68A92332A0B360D61FC0B37BC4FEB9B 100438~|~1~|~1~|~01/NHS~|~Deck Sealing Project.~|~47 - Bridge Preventive Maintenance~|~7D5500B2A4289407C6B6DF399EEA6D081AC4D019 108063~|~1~|~1~|~01/S>2~|~Bridge rehab on urban bridge.~|~13 - Bridge Rehabilitation~|~3430CFFCA2B5570A57BFDD3E8300B765E069E81F 111072~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster TID Funding - 4TM7 (100% State) - See CAP Comments - Installation of signal at SR 188 and Mill Park Drive/Delmont Road.~|~21 - Safety~|~2214E23A3B726A4E2C221C01903D595661312E65 116469~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes.~|~44 - Other~|~15ACA2AA4E00B959C8586AB29C800F2EC190F55D 102582~|~1~|~1~|~01/NHS~|~On US 127 from 7.03 to SR 116 at 8.54~|~17 - Construction Engineering~|~BD943E716863A2310E91F64A4719AA65BB816578 102582~|~1~|~3~|~03/NFP~|~On SR 698 from SR 103 at 0.00 to CR 313 at 6.44 and on SR 330 in Hancock County from the north corporation limits of the Village of Vanlue at 1.26 to SR 568 at 3.00.~|~17 - Construction Engineering~|~BF7EA8FA408E57B105005B9F0A132CF93D63DC37 102582~|~1~|~4~|~04/S<2~|~Work on SR 568 in Hancock County from the east corporation limits of the City of Findlay to the Findlay Urban Area boundary at 4.40. Funds from the District Preservation Program budget.~|~17 - Construction Engineering~|~F47AFD3FED334CF73A396E8E015FB8879E4E8E55 102582~|~1~|~2~|~02/STR~|~Work on SR 103 in Hancock County from the ECL of Arlington at 12.42 to SR 37 at 16.96. Work on SR 568 in Hancock County from the Findlay Urban Area boundary at 4.40 to the Wyandot County line at 11.26. Work on SR 49 in Paulding County from the Van Wert County line at 0.00 to the south corporation limits of the Village or Payne at 5.79 and from the south corporation limits of the Village of Antwerp at 12.53 to the north corporation limits on the Village of Antwerp at 14.07. Work on SR 111 in Paulding County from SR 49 at 4.67 to the west corporation limits of the Village of Paulding at 11.16. Work on SR 115 in Putnam County from Broad Street in the Village of Kalida at 9.75 to SR 15 at 16.73.Work on SR 189 in Putnam County from SLM 8.53 to SR 12 at 11.58. Work on US 127 in Van Wert County from the Mercer County Line at 0.00 to 7.03. Funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~7B8DB4761C2573C1A13A32477B20BFEBAB0040C6 86696~|~1~|~1~|~01/STR~|~Brdg replacement. 3604209 HIG SR753 9.59 Intersect: Trib Of Plum Run0.33 mile south of TR310 (Dean Park Road) 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~42F1518320F7EF6F2D7CE028A0C0493D64E17487 93157~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on 6003699 MUS IR70 25.9 Intersect: 70 Under C55 Rix Mil Rd; BR Eligible for Rehabilitation: Length=346 SD/FO(2) SR=74.0 DSR=5~|~13 - Bridge Rehabilitation~|~1FF6F95A2E47F30CDA1214E157DFBE7AC3A8622F 96212~|~1~|~1~|~01/STR~|~STP Rural 80/20 Fed/State MRW-229-0.72 5902584~|~04 - Reconstruction - No Added Capacity~|~B947F85AA0654275D13E469DF61497DAA8EB6DC0 84276~|~1~|~1~|~01/BRO~|~Replace existing concrete box structure (HOL-62-3104, SFN 3801578) with a new four-sided concrete box.~|~10 - Bridge Replacement~|~D44D5112F1BFB80A61141FEE8BA4430AB79C563A 112325~|~1~|~1~|~01/SAF~|~Guardrail replacement project on various routes and sections in HOC Co. Funded 100% Federal.~|~21 - Safety~|~7BD1E70460F01D17CF77876EC4025C1779796DFB 109024~|~1~|~1~|~01/STR~|~The VILLAGE is constructing road improvements to support the expansion of a new Airstream manufacturing facility; specifically, located in the south east quadrant of SR274. The project shall include widening SR 274. to include a new 405' westbound turn lane and a new 335' eastbound right turn lane with semi-actuated signal will be added with side street stop bar detection on new drive to be constructed.~|~03 - Reconstruction - Added Capacity~|~7B86AF524EE278C0F8167094477187AA86E14D3C 94022~|~1~|~1~|~01/STR~|~US42 - Intersection improvement - CEAO HSIP Funds~|~21 - Safety~|~9C9EAF9090167CD214229FD9101B5FF28D1D3E11 120094~|~1~|~1~|~01/S>2~|~Construct Roadway Safety, Bicycle, and Pedestrian Improvements~|~21 - Safety~|~F4744D266F0D3497C15FD64BDE3D00FEC1FB2697 98661~|~1~|~1~|~01/IMS~|~Plan split for all work~|~44 - Other~|~563D2037B9F0ABA926CBE4D76D7EFF93BE66CC3D 98661~|~1~|~2~|~02/SAF~|~Signal work at the IR-90 EB exit ramp (SLM 17.28) to Chester Avenue in the City of Cleveland elgible for safety funding.~|~21 - Safety~|~CFB33EAA655E4EA04D1D777C2D4385883F558BAA 76798~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~~|~0639A5E80E9231FE6DC2766190E120A24558AFE7 76798~|~1~|~2~|~02/IMS~|~Plan split for pavement rehab~|~04 - Reconstruction - No Added Capacity~|~942751523F93F6B1B095E6981B681D488EB6B960 94083~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 86 from 0.00 to 3.33~|~05 - 4R Maintenance - Resurfacing~|~C96DFB2E6977A4D81AFCCF9F07BF61B2D42F011B 126023~|~1~|~1~|~01/NFA~|~plan split for bridges.~|~04 - Reconstruction - No Added Capacity~|~EE2668D648DE404B8C991DDACC2A19E596514A48 117473~|~1~|~1~|~01/ENH~|~ADA sidewalk improvement~|~28 - Facilities for Pedestrians & Bicycles~|~A1C5EC0CC99B805291779C9E17F170CD28C49F92 115894~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~08A5107013AD271856B2CC902F97722A89631CD6 96077~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Facility Project Land & Buildings Major New Program Construction LBN7 (100% State) - No CAP - For construction of a 200 ton Salt stroage building at the Old Washington Outpost~|~44 - Other~|~317ADBCAA1066D63BC4D8DA78D17F76FC8669952 103432~|~1~|~2~|~02/NHS~|~Guardrail replacements/repair along SUM SR 21 from 12.00 to 21.44.~|~21 - Safety~|~6EBE158F049EA3A96895C9FDF29EB146EBD8B610 103432~|~1~|~1~|~01/IMS~|~Guardrail repair/replacements along SUM IR 77 from 15.50 to 17.50 and SUM IR 480 from 7.00 to 8.00~|~21 - Safety~|~2F69524CECC084C988B3D011AB80625E16281D22 124639~|~1~|~1~|~01/IMS~|~Pavement replacement.~|~04 - Reconstruction - No Added Capacity~|~A5F4BEADFCB30307E197E605A584B01BAE93EA10 111119~|~1~|~1~|~01/SAF~|~Plan split for intersection work.~|~~|~8C5BA5948A9D63ADF51286DCCC528FEACF7095BB 98115~|~1~|~1~|~01/STR~|~Asphalt milling and resurfacing in spot locations including pavement markings and pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~F0D317C239DF10C6515F8B6F366609840B638F64 99573~|~1~|~1~|~01/SAE~|~Upgrading pavement markings on various Medina County Roads.~|~21 - Safety~|~9FE4729C66DABF77946BDD2112064457A5402AFE 117611~|~1~|~1~|~01/S5K~|~All work is included in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~8A2B449FECC53F60FDC58BF54B8DB28F5E208E00 92388~|~1~|~1~|~01/BRF~|~Preservation project on Bickham Covered Bridge in Logan County SFN 4633431 LOG CR 38 0.29~|~32 - Historic Preservation~|~E237CD9D1FC9A2E57D0AADAD603CBF994072146E 113096~|~1~|~1~|~01/STR~|~Resurfacing STA SR 619 from 7.36 to 14.74.~|~~|~673F0EC04D5BD1D7E1C3F979E02BE53BA2409DCD 113096~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span.~|~~|~608375B9F76916E543BE96989031AB3867B9ECD0 116597~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0DD253FE517AC3352235DE4BFC67C75197490CE3 108973~|~1~|~1~|~01/IMS~|~Repair over-height impact damage to bridge GRE-675-1600R which carries IR 675 over Yellow Springs Fairfield Road.~|~13 - Bridge Rehabilitation~|~A6B7F085CE16031EE5EC9230ABA6B65E78C065A1 101359~|~1~|~2~|~02/NHS~|~100% City of Elyria Items (pavement repairs east of Station 17+00)~|~05 - 4R Maintenance - Resurfacing~|~3CE73A42EB3889CE9DBE52F78DE0F642CEB3ACEB 101359~|~1~|~3~|~03/SAF~|~Safety project road diet - Safety funds for traffic items (signing, pavement markings and signal work) throughout the entire project.~|~21 - Safety~|~C46309A19DBE3DA86775BEA5581BF2A9140CDE51 101359~|~1~|~1~|~01/NHS~|~NHS Urban Paving - 80/20 Fed/Local (paving work east of Station 17+00 except pavement repairs)~|~05 - 4R Maintenance - Resurfacing~|~EB5BF1A52FAE93A4E92ED488901BB1211F9956CC 101359~|~1~|~4~|~04/SAF~|~Safety project road diet w/ 10% local match for pavement and roadway items on Cleveland St.~|~21 - Safety~|~F98618D421844EF8945B4CC0B31EB60EA7C7AE5A 119378~|~1~|~1~|~01/S>2~|~Bike/Ped Improvements~|~28 - Facilities for Pedestrians & Bicycles~|~D6D6AB40E0B65D3139A6EA6F83AA47440AFCC34D 115201~|~1~|~1~|~01/CMQ~|~Complete reconstruction of five traffic signals, installation of new traffic surveillance cameras at each location and relocation of exiting fiber optic signal interconnect cable underground.~|~21 - Safety~|~059E09CA487E9DE2A2DE8A616E0626F8135F09D8 91695~|~1~|~1~|~01/IMS~|~ Rehabilitate Structure PRE-70-0689L SFN 6800998 over Bantas Fork located 0.57 miles east of Pence Rd. (T-120) by replacing the Forward Abutment and Approach slab.~|~13 - Bridge Rehabilitation~|~2645EB88D415B51DEBFA43EE71163BF99ADB15AF 109220~|~1~|~1~|~01/NFP~|~Operations Chip Seal 2017~|~05 - 4R Maintenance - Resurfacing~|~49F5278A71603102932E5B78EC9BD657DE386935 105688~|~1~|~1~|~01/NFP~|~All work is in this plan split. Uses 100% state funds from the district preservation budget using SAC 4PS7.~|~21 - Safety~|~92ADBBC6D80ACC80923B084BEF39ABBF38DB9DF6 115602~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~F9A93FF5DD194AB91C2A09B0204DF05C0935FE12 84019~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~52957323EAEBEBA5211BAC03A179690CB1082DA4 110721~|~1~|~1~|~01/NFP~|~All the work in the project.~|~44 - Other~|~3D9CF54308BA104E77B68F8063B5738EE68C7F78 123247~|~1~|~1~|~01/S5K~|~Raised Pavement Markers~|~21 - Safety~|~AAA78F798E24934A52537BCEE44BD9F8D92D8E81 100885~|~1~|~1~|~01/CMQ~|~Reconstruction of the existing intersections of Snider Road with Thornberry Court and Snider Road with Mason Road into single lane modern roundabouts.~|~21 - Safety~|~7184608D9E54CE4614B8706941E7F083CF0FCC95 81726~|~1~|~1~|~01/IMS~|~priority system minor rehab. of BEL-70-0.00 to 5.04; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~116B9FD41902B3F7CA728CF4511FCFA8E0F7A3C8 125814~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~3728112A2394D2DCB19099AC236724CC9ECFFF6E 100303~|~1~|~1~|~01/MPO~|~Construction of bike boxes~|~28 - Facilities for Pedestrians & Bicycles~|~5A65285E90E174E8CF46CD4CCD433E7D3AA4EA93 118590~|~1~|~1~|~01/STR~|~Plan Split 01/STR/OT/ - 100% State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9DB700AD326F9246BDE46A3C4EC031C1C0F1AEF2 83245~|~1~|~2~|~02/STR~|~Roundabout Lighting~|~04 - Reconstruction - No Added Capacity~|~125D8CAED19F52B6D99DB1F16D9A7115503766D5 83245~|~1~|~1~|~01/IMS~|~Normal Project Participation funded by two developers, then 629 funds, then Jobs & Commerce, then West Jeff SIB loan~|~04 - Reconstruction - No Added Capacity~|~2F529B8CC3C5156F2B724E66390B5FA013C4C34E 98961~|~1~|~1~|~01/MPO~|~Tranist Multi-modal Facility~|~01 - New Construction~|~21DEE5F508F1A44D5ACFA1F65305B0212E863C4B 126618~|~1~|~1~|~01/ENH/MCDO~|~Sidewalk replacement.~|~28 - Facilities for Pedestrians & Bicycles~|~3A5A8D218549696A4087E178E6953980DEF97CD5 108981~|~1~|~1~|~01/ENH~|~Enhancement project of sidewalk replacement, parking construction, lighting, monument restorations, ADA modifications, way finding signs. TAP funded.~|~28 - Facilities for Pedestrians & Bicycles~|~1855BC1DDF5B39B881D024FDAA32868CAB7C0E81 108981~|~1~|~2~|~02/S<2~|~100% City items. ~|~28 - Facilities for Pedestrians & Bicycles~|~BBBFCCA8B9081BBE164192A60CB50F27814F9725 110664~|~1~|~1~|~01/BRO~|~Backwall Repair for structure TUS-36-0091 (SFN 7900155).~|~13 - Bridge Rehabilitation~|~8EDC196D8925BE832167DB21749F0CF52783E370 110664~|~1~|~2~|~02/BRO~|~Plan Split for backwall repairs of structures TUS-250-1577 L&R.~|~13 - Bridge Rehabilitation~|~F2D4CED894C1A3410512273B7E2853DC5D635889 106039~|~1~|~1~|~01/NHS~|~Slide repair along southbound Ridge Road between the Best Buy driveway and CSX railroad~|~44 - Other~|~4DDA8A9373413ECA65EE1C8F6177902FB512750A 124617~|~1~|~1~|~01/STR~|~Pavement Markings on Various Richland County Roads~|~21 - Safety~|~14E30282F74A1CE1E88AB18AC95379CF88A4FEF4 94442~|~1~|~1~|~01/S<2~|~Bridge Repair - RIC-430-3.66 (SFN 7006152)~|~04 - Reconstruction - No Added Capacity~|~97A55851432C12A7A7E9BD92B06F61ECE52B5487 97487~|~1~|~1~|~01/STR~|~Culvert replacements of CFN 760620110 STA-62-1.98, CFN 760440100 STA-44-2.03, CFN 760930190 STA-93-7.85, CFN 761730050 STA-173-0.80, STA-183-10.71~|~44 - Other~|~0F8B00D48280E786F1FD8AFC5AA7D055BA508782 96165~|~1~|~1~|~01/CMQ~|~Establishes a truck parking area at an abandoned weigh station off of JEF-7 at SLM 3.90 for northbound traffic. Includes Pavement, lighting, guardrail, and drainage.~|~21 - Safety~|~0203D8C7B9FEF2B6829DFAE2EB438204B6C12163 113896~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~~|~3CD588E5FB98FD49D728B5FBEB0692AE04530056 119151~|~1~|~1~|~01/S5K~|~Resurfacing on HOC 93 12.03-12.34.~|~05 - 4R Maintenance - Resurfacing~|~BEA6D78FE342644BDDE22956C272C60F5197DEF6 119151~|~1~|~2~|~02/STR~|~Resurfacing for ATH-78-3.54-8.89 and HOC-78-0.00-3.27.~|~05 - 4R Maintenance - Resurfacing~|~73530EFF33ECE9EF255E368915607AE34EBE0944 90464~|~1~|~2~|~02/BRF~|~Repair piers and replace deck on NOB 260 0187 (SFN 6103278). BR eligible off system funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~B026327F9BC097CAB11E9A05F3B256DDACB1CCB9 90464~|~1~|~1~|~01/BRO~|~Bridge rehabilitation project. Repair piers on NOB 285 1371 (SFN 6103871). BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~F88BB7AFEDAC8AE0BB68C177DD14B90CEA78A9A9 115923~|~1~|~1~|~01/MPO~|~Resurface Bancroft and McCord~|~05 - 4R Maintenance - Resurfacing~|~836E2A07DBBB6D9F3CDE47E42E208507A3C45A26 97638~|~1~|~1~|~01/SAF/Nort~|~New capacity and safety improvement on Cleveland-Massillon Road (CR-17), from Pleasant (SLM 8.42) to Weber (SLM 7.92), in the City of Norton, Summit County, Ohio. ~|~04 - Reconstruction - No Added Capacity~|~E134D88AFC4806FD4B62C78379F6141544CFB368 97638~|~1~|~3~|~03/S>2/NORT~|~Construction of Sanitary Sewer along Cleveland Massillon Road in the City of Norton, Summit County, Ohio.~|~43 - Utilities~|~72202294CD500D6004F2127CB75FE4975936C5B0 97638~|~1~|~2~|~02/MPO/NORT~|~Widening of CR-14 between Shannon (7.44) and Weber (7.92), in the City of Norton, Summit County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~BA147943AD3C961A2FBE417D25CE856E81816A1B 92123~|~1~|~1~|~01/NFP~|~100% state funding for all work~|~44 - Other~|~74AF595007C42FD5B5A856322533A617B870DD11 100848~|~1~|~1~|~01/STR~|~PIK 335 14.55-24.78~|~05 - 4R Maintenance - Resurfacing~|~ECE7AE772B413FFD3D3BB3FF7DCA06096E4377E9 100848~|~1~|~2~|~02/STR~|~PIK 335 21.65 (SFN 6603092)~|~47 - Bridge Preventive Maintenance~|~7C9E9E769A0509F0416E7DA45D9D4005961D65C8 76989~|~1~|~1~|~01/BRO~|~Line existing corrugated metal pipe structure COL-14-0571 (SFN 1501356) with new structural liner.~|~04 - Reconstruction - No Added Capacity~|~50074F4466BF86D02A770CE1DB7ECA9388FBCB35 78255~|~1~|~1~|~01/IMS~|~preventive maintenance treatment of TUS-IR-77, 0.16 MI. N OF SR 258 TO CR 23., pavement only~|~05 - 4R Maintenance - Resurfacing~|~8388D6E9560F4CE45FBD73AF9F0E8C1FA6814796 95409~|~1~|~1~|~01/S<2~|~Remove and replace existing overlay with new LMC using hydrodemolition. Place polymer modified expansion joint system on ends and epoxy inject veritcal cracks on pier walls on SFN 4601335 on Penn Central RR. Remove and replace existing LMC overlay with new LMC overlay using hydro-demolition, SFN 4604237 Houchins Ditch.~|~13 - Bridge Rehabilitation~|~BAEC82FB682FED9424AB42328C6756F344B4B464 114460~|~1~|~1~|~01/STR~|~Resurfacing SR 83~|~05 - 4R Maintenance - Resurfacing~|~C66DD5CC063FFC9C08A553E643DEB0D4794CE13A 111495~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in Meigs County. Funded 100% Federal HSIP.~|~21 - Safety~|~C075D20CF731D8F6B8E6E11BA9F2A00E38CBE1ED 83054~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation Paving 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Lic-US 40-28.58 to 29.39; 2) Mus-US 40-00.00 to 01.09; 3) Lic-US 40-29.39 to 30.14; 4) Mus-US 40-01.09 to 05.10;~|~05 - 4R Maintenance - Resurfacing~|~EEBA786F11B56E9D9C237E814748FD89061C26A8 83054~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation Paving 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on OFAH-Urban: 1) Mus-US 40-05.10 to 09.15~|~05 - 4R Maintenance - Resurfacing~|~CC946F65129B8351C38FFBFAF0CACAF9300F4BD2 99891~|~1~|~1~|~01/CMQ~|~Extend existing Left Turn lane on West Maple Street from Main Street to Ream Avenue.~|~21 - Safety~|~2AD148E6CEA0DB14E53E85E6FC22D3C9A94C1393 96676~|~1~|~1~|~01/NHS~|~Plan Split for the roadway work within the project. This includes mainline and all ramps within the project limits.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A461B38509761750313131D2C736C2DDC684267E 110909~|~1~|~1~|~01/SAF~|~Work to enhance the safety of sidewalks and crossings that is eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~F2B5C25B24CD4582FBA349B06B6EEE2AB9082240 92990~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Cos-SR 541-08.73 to 17.79; 2) Cos-SR 541-23.63 to 29.48;~|~05 - 4R Maintenance - Resurfacing~|~1D420AEAC2077D2CAA53E973B854715DE9C8F6F7 92990~|~1~|~2~|~02/S5K~|~"02/SK5/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-SR 541-17.79 to 18.72~|~05 - 4R Maintenance - Resurfacing~|~1ADECE73711E135C168BA68156D468CE53C6CB89 122225~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-80-G~|~~|~78F94DBFB3E74A15D04A20F3D285BE0F778086C1 94301~|~1~|~1~|~01/NFP~|~100% state funding participation~|~44 - Other~|~4B84E02AB9F1F07A87AD10872F70077D985886F7 119774~|~1~|~1~|~01/SAF~|~Repair of sidewalks along SR 3~|~28 - Facilities for Pedestrians & Bicycles~|~1AD0BAB5F74A96B41E15EBBBAF549BB847A3F4B8 101337~|~1~|~1~|~01/STR~|~Bridge Rehab.~|~13 - Bridge Rehabilitation~|~6CA7954F31DF6BD3C59EBB1E41A902A22C705E56 95873~|~1~|~1~|~01/NFP~|~Two year Mowing contract Districtwide D-2~|~44 - Other~|~CA13CD1997DCD57B2F84DEC66E2C0578361D3D64 116571~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~AAD4B87323FC433E7E0CC7C020C16DAAEF4F6075 101095~|~1~|~1~|~01/NHS~|~BRO 68 15.35~|~04 - Reconstruction - No Added Capacity~|~09564C167F9AA392EDC2F0441D8023E24B21E9DB 103155~|~1~|~1~|~01/NHS~|~Funding Split for all work on or before July 26th is eligible for 100% federal reimbursement and shall be charged to this funding split.~|~04 - Reconstruction - No Added Capacity~|~FCF31C18138B59303F73E59D74BEEF34695BAA84 103155~|~1~|~2~|~02/NHS~|~Plan split for all work completed on 7/26/16 or after and is only eligible for 80% federal reimbursement.~|~17 - Construction Engineering~|~DB3031105AB3512CD384B4EF6D44FE81440F52B9 119010~|~1~|~1~|~01/BRF~|~Bridge rehabilitation work to replace superstructure only.~|~13 - Bridge Rehabilitation~|~491D099F6322A17680FF980EBBB3B9268F3DDE28 99196~|~1~|~1~|~01/NFA~|~Scioto County various routes guardrail.~|~21 - Safety~|~15F833C4EE1BA37984C36C95B0BCA7473E9D6B01 108521~|~1~|~1~|~01/NHS~|~Drainage improvements on STA SR 43 in Canton Township, Stark County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~A7A28FC9C63E9FA32642F13867056978B3C23162 120882~|~1~|~1~|~01/BRF~|~All work on CR 16 to replace the bridge ~|~10 - Bridge Replacement~|~180E43A67AC44112DA7C249C967EF2945F403556 116616~|~1~|~1~|~01/STR~|~Rural plan split for resurfacing and resurfacing related items on PIC-22~|~05 - 4R Maintenance - Resurfacing~|~481F2A6AF7F7E8CBC2CF39695E8A62FB32B43E5A 115337~|~1~|~1~|~01/MPO/TALL~|~Resurfacing.~|~~|~9C830367C77B215EA97653A10DA2BD4D022F2E90 90983~|~1~|~1~|~01/MPO~|~Resurfacing CR68 in Trumbull County from 0.260 to 1.870~|~05 - 4R Maintenance - Resurfacing~|~B695BC0C9495C20BE503A6356E54E0715703A0BF 99559~|~1~|~1~|~01/SAE~|~01/SAE/OT - 100% federal 4HB7 funds~|~21 - Safety~|~8B92D9752D8D9E1D9C6FCDD1A8162B7281682EBD 99559~|~1~|~2~|~02/SAF/HAS~|~100% local force account inspection~|~17 - Construction Engineering~|~914693B4DF4261A7C498003DAB912D44C25A8A16 104061~|~1~|~1~|~01/STR~|~Rockfall remediation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDAF6394743809E907AADB83D3962CA014A2CC1B 125655~|~1~|~1~|~01/IMS~|~plan split for the resurfacing work on IR 71~|~05 - 4R Maintenance - Resurfacing~|~82CAD701FD77F35AEEB79AF75C9B00332A577912 121336~|~1~|~1~|~01/STR~|~STP Rural plan split.~|~05 - 4R Maintenance - Resurfacing~|~B16C31304261FB18AC0FE9D9F1ED3985118533A0 125913~|~1~|~1~|~01/STR~|~Superstructure replacement~|~13 - Bridge Rehabilitation~|~84F4F1D936F4BD30B27266047008EEE4D4D96141 96942~|~1~|~1~|~01/NFA~|~Task order construction inspection~|~17 - Construction Engineering~|~9F5E2B3365A1121107ECC4D988FB21A4BB477836 97112~|~1~|~1~|~01/BRF~|~The replacement of SFN0334766, 0333964, and 7031149.~|~10 - Bridge Replacement~|~01CD640D6A4E8DFCE23D364B676DCD9C7695D37D 97112~|~1~|~2~|~02/BRO~|~The replacement of SFN7033648 and 7033583.~|~10 - Bridge Replacement~|~FA6F9C8BCCAEE9844CF4D3A5B0B4C1B8996C8983 110272~|~1~|~1~|~01/MPO~|~The walking surface, lighting, drainage, amenities, and connectivity of the existing pedestrian path are in need of improvement.~|~28 - Facilities for Pedestrians & Bicycles~|~95D2CCDFBDBE11B9D09B14E0D3BD69E255ADD86D 97086~|~1~|~1~|~01/BRF~|~The replacement of SFN# 5931347, 5930499, 5932521, 5932319, 5932831, 5930405.~|~10 - Bridge Replacement~|~418B9B29E025E4E61C89D118016190F005E3DC41 106449~|~1~|~1~|~01/S<2~|~Replace existing failing roadway - MER CR 144 (Market Street) SLM 7.038 - 7.288.~|~04 - Reconstruction - No Added Capacity~|~6D139E25DA8EFDC60177ECD9918D98D03CB1DA1E 113708~|~1~|~1~|~01/SAF~|~Rebuild the traffic signal at SR-235 and Dayton Yellow Springs Rd.~|~21 - Safety~|~6C7CF39B11FC337B980E05DDA11C49624635CCD9 117048~|~1~|~2~|~02/S5K~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 9.488 to 10.005~|~04 - Reconstruction - No Added Capacity~|~6A08D3C09912B45A32013245FAC4DC0F68AC7D53 117048~|~1~|~3~|~03/STR~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 5.224 to 9.488~|~04 - Reconstruction - No Added Capacity~|~48E11E6B13946953D5179A9851F1BAC2BD7DA8DD 117048~|~1~|~4~|~04/S50~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 3.023 to 5.224 (ONTARIO) RIC SR 314 3.020 to 3.023 North bound. ~|~04 - Reconstruction - No Added Capacity~|~19310E6CE77540C495CAF2AD53258863FCB7F95B 117048~|~1~|~1~|~01/S50~|~Edge Reconstruction with Asphalt Concrete Overlay RIC SR 314 3.014 to 5.224~|~04 - Reconstruction - No Added Capacity~|~322D290CE201F12B4D1BA259810ABE6408EDA710 110953~|~1~|~1~|~01/SAE~|~12 school zone flasher 20 MPH sign upgrades, 74 pedestrian signals, 3 new pedestrian signals, 1 new HAWK signal and high visibility thermoplastic crosswalk markings as needed.~|~~|~F18B442C428F555D2C68063600F9DE6B7C03F884 118245~|~1~|~1~|~01/MPO~|~Multi-use path along the south side of Millsboro - RCRPC funded~|~28 - Facilities for Pedestrians & Bicycles~|~ACC0E6D4F9FC5442913569B1036DCF78591AD12C 127047~|~1~|~1~|~01/SAF~|~Install sidewalk along Jer Les St (TR-740) to connect from Branch Hill-Guinea Pike (CR-21) to Boyd E. Smith Elementary School in Miami Township Clermont County. Pedestrian crossing improvements to be included at the Branch Hill-Guinea Pike (CR-21) and Jer Les St (Tr-740) intersection.~|~28 - Facilities for Pedestrians & Bicycles~|~2E8711203AB295246828A5FB96358768B2410DBB 93850~|~1~|~1~|~01/ENH~|~Adding a turn lane at the Hamilton Street intersection. Project pavement will be 41 feet back of curb to back of curb and will consist of two 12 foot driving lanes and two 8 foot parking lanes. Project will also include a curb lawn with tree plantings and five foot sidewalks on both sides of the street. The curb lawn from Blackhoof Street to the first alley shall contain brick pavers. The project will incorporate new City street lighting consisting of light pole fixtures to mirror the lighting on East Auglazie Street. Driveway approaches shall be reconstructed. Five intersections are part of the proposed project of which the intersection radii will be reconstructed to allow for improved traffic flow. Also the installation of storm sewer piping, catch basins and manholes, and the addition of underdrains, and an outlet storm line and the replacement of water main, water services, and fire hydrants. Replacement of manhole and sanitary services.~|~31 - Landscaping & Other Scenic Beautification~|~44018AAEC08C284F08DA2878E810ECE63D23CE74 118756~|~1~|~1~|~01/STR~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~3B8B8D337417EEBD0F1DD0ED8CB73BE3BBEB06D4 118756~|~1~|~2~|~02/S5K~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~43CCBD2C252525098AAEC345EE7F19384E01E302 105092~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan Split 1 for Fai-188-19.05 to 24.53~|~05 - 4R Maintenance - Resurfacing~|~7F7C360D7AE3948B763108AC49FD1069AF0770CF 105092~|~1~|~3~|~03/NFA~|~03/NFA/PV - Plan Split 3 for FAI-188-24.53 to 26.53~|~17 - Construction Engineering~|~F30C548280654F4DF6EEEA6448CB394FC7636EAD 105092~|~1~|~2~|~02/S5K~|~Resurfacing within STP Urban segments outside of Lancaster~|~17 - Construction Engineering~|~6E7ECE07836F02EBE692293DA0DDDE6ADDB31806 105092~|~1~|~4~|~04/S5K/LANC~|~Resurfacing within city of Lancaster~|~05 - 4R Maintenance - Resurfacing~|~E5906BCF5EFF281D5DF7F0F2589980D105FC3A59 119061~|~1~|~1~|~01/IMS~|~Plan split for project to paint bridge HAM-275-3895 L/R that carries I275 over Fourmile Rd/Creek and HAM-275-4036 that carries I-275 over Sutton Rd. ~|~13 - Bridge Rehabilitation~|~B9468758042DF5C631E4E90E84611229B573DBCA 92233~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work on this project is in this split. The funds are being provided by Central Office Facilities.~|~44 - Other~|~7B2345890DD636FC48ABFCBB66D78D18CDCDA029 120596~|~1~|~1~|~01/MPO~|~Federal items.~|~05 - 4R Maintenance - Resurfacing~|~AD43C373148A7A32191586DC09E77C247BDE9E00 124751~|~1~|~1~|~01/NFP~|~Repair of noise wall~|~20 - Environmental Only~|~5B093E04F4EDF293A9A0E3D55D52A4E72DA85B26 117962~|~1~|~1~|~01/S50~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~F61E0584C7C649C1474E275630E5349D3C69B0CE 117962~|~1~|~2~|~02/S50~|~Full depth repairs - 100% local~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FB0A14455A9A73BCC76F7913EA7046DE77A24C4D 95521~|~1~|~1~|~01/STR~|~SHE 47 22.35 pave invert of existing 96" conduit and SHE 274 15.19 remove and replace the existing 90" x 78" conduit.~|~04 - Reconstruction - No Added Capacity~|~0043CBADAFD60702DDB9E2A1A94BB0ACFFF5715F 106503~|~1~|~1~|~01/S<2~|~Replace PRE-320-0200 and 0188 culverts. Repair PRE-320-0213 culvert.~|~04 - Reconstruction - No Added Capacity~|~D5F93E38CEB597BC00822B745F0F4F63A75E6653 104247~|~1~|~2~|~02/SAF~|~Work funded with safety program funds. The Safety funded portion of the project between Sixth St. and Center St. will include a road diet, bike lane and signal improvements.~|~21 - Safety~|~DCE064BD38C09D94B3EE8ECB4763662D08ACA10E 104247~|~1~|~1~|~01/ENH~|~Construct multi-use paths, bike lanes, and shared lanes. Funding from the Transportation Alternatives Program. Funding is 95% federal with Toll Credit. The 5% not federal match is provided by the City of Findlay. All funds needed if the cap is exceeded will be provided by the City of Findlay.~|~28 - Facilities for Pedestrians & Bicycles~|~B758C89566C4B1199830663E5B8068EAE5AA2479 97424~|~2~|~2~|~02/STR~|~SFN 7402465~|~10 - Bridge Replacement~|~77FD7B19C9D9E78CB17B29EE90446C992B4D50FA 97424~|~1~|~1~|~01/STR~|~Culverts on SEN-19 @ SLM 11.82 and 16.68; SR 101 @ 10.134~|~04 - Reconstruction - No Added Capacity~|~9BDC160A6AA991ECD78C8E623ED99A498D8B6CA7 98487~|~1~|~1~|~01/NFA~|~District Preservation Program funds. 100% state funds. SR 294 is a Rural Minor Collector and not eligible for federal funds.~|~05 - 4R Maintenance - Resurfacing~|~A01F75F1CB232D9987B4464986786C655FCC42D1 97568~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. WAR-MONTG-0011 (SFN: 8361029) in the Village of Carlisle, and Bridge No. WAR-HANOV-0005 (SFN: 8362165) in the City of Mason.~|~13 - Bridge Rehabilitation~|~CF2C2F05D18D157FB09761170D706B8AC2FC8B54 89168~|~1~|~1~|~01/IMS~|~All work for the auxiliary lane addition~|~44 - Other~|~7122066EBB16EE9E1FF4C07CCAE9916AFA818434 104045~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement 100 federal 4HB7 on various routes.~|~21 - Safety~|~2D506B896E639A11F8876F0EED42416B9028CEC3 94668~|~1~|~1~|~01/SAF~|~Install Roundabout at SR 83 and Smithville Western Road~|~21 - Safety~|~79C3C7E0F521A9424A031D5ADC1A4D6B64958949 105466~|~1~|~1~|~01/STR/FAY~|~Chip Seal~|~~|~6F5EB7AD295E2662D617BA02B5F11A7CEAFAE56E 105466~|~1~|~2~|~02/STR~|~Chip Seal~|~99 - State Preventative Maintenance~|~8E484B7A14C915D2BF8711D21A5DC8B0DC348B98 126218~|~1~|~1~|~01/S>2~|~Construction plan split for STBG funds~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54E5ED7EFC01599A99B307E0C155082086313552 90921~|~1~|~1~|~01/NHS~|~7201664 SAN US20 10.35 Intersect: Muddy Creek~|~44 - Other~|~D35D051AC79D25B8EF2919715675924745B2866E 127165~|~1~|~1~|~01/NHS~|~Lighting Maintenance project. GAL 35/325 Rio Grande interchange.~|~21 - Safety~|~F38F506786618BA1A3005C21F070715C39B3AA5A 127165~|~1~|~2~|~02/STR~|~Lighting Maintenance project. GAL 35/325 Rio Grande interchange.~|~21 - Safety~|~6F23B9B8BBE28534761B4B6B1B2F27E0432CDB18 101389~|~1~|~1~|~01/S<2~|~CO CO Contr 01 plan split created for the following routes: FRA-3-20.23-23.07/24.47-26.28~|~05 - 4R Maintenance - Resurfacing~|~49C031331544F35BF933439C7AE3C70E7364D843 101389~|~1~|~2~|~02/S<2~|~CO CO Engr 01 plan split created for the following STP routes: FRA-3-20.23-23.07/24.47-26.28~|~17 - Construction Engineering~|~ABDC007530FDA56632474A165ED82A47CC801EF8 95592~|~1~|~1~|~01/MPO/BDAM~|~All work in this project. Resurfacing including joint repair. MPO-STP funds. The non-federal funds will be provided by the Village of Beaverdam.~|~05 - 4R Maintenance - Resurfacing~|~82C203890939455B343CCEE6D9E228BD2108D383 102147~|~1~|~1~|~01/STR~|~Bridge replacement SCI SR 348 6.92 (SFN 7305532)~|~10 - Bridge Replacement~|~A8C20892DACCD273F490BBC785757010197393D2 121587~|~1~|~1~|~01/MPO~|~rehab of S. Detroit street from Miami Ave. to Southern Corp line~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CCCE51BBB429F818C8168608F012191F8C388028 107823~|~1~|~1~|~01/STR~|~All routes except MAR-746 and bridges on those routes~|~05 - 4R Maintenance - Resurfacing~|~18D8614D4DA0B92A18DCBFB2BFD49934655C67D8 107823~|~1~|~2~|~02/NFA~|~MAR-746 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~5A9AFE367154129FB58A19AE8793258F0B9AEB7A 125396~|~1~|~1~|~01/STR~|~Resurfacing and related work on SR 229 in Knox County.~|~05 - 4R Maintenance - Resurfacing~|~034CEB3DAABC8BCBF9AF2E834B5C3999FD0376A4 115812~|~1~|~1~|~01/SAF/MCEO~|~CEAO HSIP Program - 4HB7 (100% Federal) - See CAP Comment -Project to install new or upgrade existing guardrail on various county routes in Muskingum County~|~21 - Safety~|~C911DA4E9838912FC058DA56FA33E15A62949E5C 100183~|~1~|~1~|~01/NHS~|~Work on Main Street from Woodley to Lima Avenue. NHS~|~05 - 4R Maintenance - Resurfacing~|~88B89DFD5D19A7C93B62DD155E7678C128761AD0 114608~|~1~|~1~|~01/NHS~|~Double micro on JAC 32.~|~05 - 4R Maintenance - Resurfacing~|~C9DEF9CC17108E2E2D459B0A46C9F83E0BA9DD66 109663~|~1~|~1~|~01/S<2~|~Resurfacing SR 14T~|~05 - 4R Maintenance - Resurfacing~|~37618A9F5137018D360B7467951D276E78E552A5 106259~|~1~|~1~|~01/S<2~|~ER landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF556AC5688A319DE54883807B8EF8D5C1D3E6B5 116235~|~1~|~1~|~01/STR~|~Chipseal. ~|~05 - 4R Maintenance - Resurfacing~|~4B642D2424E4D6691D3B0591E27CD0F97DA2EFD1 116235~|~1~|~2~|~02/NFA~|~Chipseal.~|~05 - 4R Maintenance - Resurfacing~|~8F4FA310CA6CD649CC603E6F7F6495862833D960 116235~|~1~|~3~|~03/STR~|~added plan split.~|~47 - Bridge Preventive Maintenance~|~32E707EB3CE545A68027EFCA37FD4752344F3AF4 114554~|~1~|~3~|~03/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~4CEC84C2B20AF8DD025D7EAC12CFDDC658C017FE 114554~|~1~|~2~|~02/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~8360BFC2FDBD3B9FEBED31311E91129F95F61B45 114554~|~1~|~1~|~01/S5K~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~9902A56CC967C5400F7227F2504478A39A1BD2FF 79559~|~1~|~1~|~01/BRO~|~Replace bridge deck, repair and paint structural steel, and rehabilitate substrutures with minimal approach work on SFN 0601446 AUG SR 67 0345 on State Route 67 over Interstate 75.~|~13 - Bridge Rehabilitation~|~DB28F2EA2DEE4A8C05754F7F0B139246891FAFB5 113120~|~1~|~1~|~01/S>2~|~Split for resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~D254215B940A81B47DF24850EBC46264C013920E 112666~|~1~|~1~|~01/IMS~|~Overlay i-75 and i-676 with Fine Aggregate Polymer Modified Aggregate.~|~05 - 4R Maintenance - Resurfacing~|~CA1F1E3D174635FC86658866B6A7902EC0E454F2 89221~|~1~|~1~|~01/SAE~|~100% Safety funding for ramp work01/SAE/OT/~|~21 - Safety~|~217B2162FE80E1748710F9280DC53E193661621B 100975~|~1~|~1~|~01/STR~|~DSR# BEL-022~|~04 - Reconstruction - No Added Capacity~|~A8641146DAFE8281F31D795C95AA78894A11D10A 98051~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-SR 79-(16.87-33.10)~|~05 - 4R Maintenance - Resurfacing~|~B11AA1047BA1204C75CD3BEBFBD54BE39F1CCF41 98051~|~1~|~3~|~03/S<2/NEWA~|~"03/S<2/PV/NEWA" - 4PF7 (80% Federal) / 4BG7 (20% Local) - No CAP Resurfacing of: Lic-SR 79-(15.66-16.25)~|~05 - 4R Maintenance - Resurfacing~|~E685A77489ADC698D596AD303B08C2ACD118424D 98051~|~1~|~1~|~01/S<2~|~"01/S<2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Lic-SR 79-(16.25-16.87)~|~05 - 4R Maintenance - Resurfacing~|~EE737B0F2913A45AEE9AE830F2C0C058615BA8F5 121332~|~1~|~1~|~01/BRO~|~Plan split for all work associated with WIL-34-2722 bridge~|~47 - Bridge Preventive Maintenance~|~0DFEB1EBCCEF83D886313D70C826172DC70B2B00 103787~|~1~|~1~|~01/BRF~|~Plan split for Construction~|~10 - Bridge Replacement~|~1EC670CD552736440D8647BEB7A985A27D3F300B 124959~|~1~|~1~|~01/MPO~|~Resurfacing Mason Montgomery Rd~|~05 - 4R Maintenance - Resurfacing~|~7DA2D1C230A01F56A6FA44DA259A1ED1D7C3B40F 112509~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~1CA5366F755DCC3FD8E0B094D7BF6C8B422B3B01 94128~|~1~|~2~|~02/NHS~|~Bridge maintenance on SFN 7602464 STA US 62 24.00L over SR 43, SFN 7602499 STA US 62 24.00R over SR 43~|~~|~337783DFD4BC15D7C416CEF0B07F251D50E041BD 94128~|~1~|~3~|~03/S>2~|~Bridge maintenance on SFN 7602529 STA US 62 24.86L over Nimishillen Creek and Wheeling and Lake Erie RR, SFN 7602553 STA US 62 24.86R over Nimishillen Creek and Wheeling and Lake Erie RR.~|~~|~76085CFED42A41EDC32446EDD9AAC78B0A53AF67 94128~|~1~|~4~|~04/NHS~|~Resurfacing STA US 62 from 24.02 to 24.06~|~~|~ADC21C98213AE57B90F5DE083F3A3499171DD4EF 94128~|~1~|~1~|~01/S>2~|~Resurfacing STA US 62 from 24.06 to 25.54~|~~|~F3F49C243528679E3BA07F21FA9015872F9821C6 84965~|~1~|~1~|~01/STR~|~SCI SR140 9.22 & 9.48 On SR140, 0.17 miles north east of TR294 (Railroad Hollow Road). 0.07 mile NE of CR17 (Frederick Rd.) It is proposed to replace Structure number 7304447 & 7304412. 7304412 SCI SR140 9.22 Intersect: Stream 7304447 SCI SR140 9.48 Intersect: Stream 0.17 miles north east of TR294 (Railroad Hollow Road). 0.07 mile NE of CR17 (Frederick Rd.) Project Description: It is proposed to replace Structure number 7304447 & 7304412. 80 fed/20 state01/STR/BR/State~|~04 - Reconstruction - No Added Capacity~|~8D828BAD6B8EBC3B098AA1139B63B739126CA5F0 106879~|~1~|~1~|~01/NHS~|~CRA-598-1.54-3.49~|~05 - 4R Maintenance - Resurfacing~|~D21343165DB845C5DD7C6B42B6E188CD36D2A895 106879~|~1~|~2~|~02/STR~|~CRA-598-3.60 to 5.10CRA-97-1.20 to 1.96~|~05 - 4R Maintenance - Resurfacing~|~DD424D1E63427A660BA0308EAA269666C1EF6F86 106879~|~1~|~3~|~03/S<2~|~CRA-598-3.49 to 3.60CRA-97-0.84 to 1.20~|~05 - 4R Maintenance - Resurfacing~|~8BFFEF5163C09FCBA3D86D944468AB943F5D98FA 100681~|~1~|~1~|~01/STR~|~Spot paving on the general system~|~05 - 4R Maintenance - Resurfacing~|~9C25B4D61BD820EA377A36ADE79DF610627DEEBE 107837~|~1~|~1~|~01/NHS~|~Bridge painting. All work in this plan split. District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~A916A1B7CD3918BF5DEBB50820E3DBAC8EB444B3 119719~|~1~|~1~|~01/S5K~|~All work included in this split.~|~28 - Facilities for Pedestrians & Bicycles~|~148BDF973A842D3A9A0241B19A0FC6BE5EF6F4AA 89266~|~1~|~1~|~01/S<2~|~A small City funded project to reconstruct Appian Ave HEN CR11 0-0.37~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C03B59166E3D4A338325DE14AE1A7DB1E0DB17A7 89266~|~1~|~2~|~02/S<2~|~This split is for Sanitary and Waletr line.~|~44 - Other~|~76105661B9A7C3E87ECFB2709C3E3A126E25415A 96081~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for Construction of a 1200 Ton Salt Storage building at the site of the existing Duncan Falls OP in Muskingum County~|~44 - Other~|~2266674728AED23037C9C3FDA456149A34430857 107340~|~1~|~1~|~01/NFA~|~D09 RPM FY2024~|~21 - Safety~|~7F0518E08E755D64BDB6237A71F7D98A95DB98D9 109748~|~1~|~1~|~01/STR~|~Single Course Chip Seal with Fog Seal~|~05 - 4R Maintenance - Resurfacing~|~720654285723DF2890A51F3D25B083FA8A353A94 100597~|~1~|~1~|~01/STR~|~Costs to replace the bridge.~|~10 - Bridge Replacement~|~590FDE085A689027885F026E67E5652BB2E3EBC5 104636~|~1~|~1~|~01/MPO~|~Resurfacing Salt Springs Rd from SR 46 to MAH County Line.~|~05 - 4R Maintenance - Resurfacing~|~456D4F87F8F44EAB591DF46647CBB3D59F271A6A 117927~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-B~|~63 - Electric Vehicles & Charging Infrastructure~|~5FBF9A308EAEE62CD92EF6844FBF8A539E550D4A 100126~|~1~|~1~|~01/IMS~|~Inspection~|~~|~54B193A90E5DE27052ADC0A40CC06A250B0043D5 107534~|~1~|~1~|~01/NHS~|~Resurfacing COL-11~|~05 - 4R Maintenance - Resurfacing~|~027AAF8094904F4AE9CE976CF157170431614FE7 107534~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings~|~05 - 4R Maintenance - Resurfacing~|~8B365B17154EAA2C6E3B9D5073D0AD2FB7AE683C 95213~|~1~|~1~|~01/SAF~|~100% SRTS funding up to funding cap for installation of bicycle racks~|~~|~F66CA64B944B75A933783548C4ECD7087EDE936A 100603~|~1~|~1~|~01/STR~|~Major rehabilitation of TUS-212 from SLM 9.09 to 9.49 and TUS-800 from SLM 23.03 to 28.74 and SLM 29.14 to 34.91~|~05 - 4R Maintenance - Resurfacing~|~3FFE9CF0D1C226CB1F00D1D8F9C87F8B563E763B 100603~|~1~|~2~|~02/S<2~|~Major rehabilitation of TUS-800 from SLM 22.74 to 23.03~|~05 - 4R Maintenance - Resurfacing~|~15773C342798C76F80A3A830469BA7D02861DC53 100603~|~1~|~3~|~03/STR~|~Detailed design costs for design-build contract.~|~~|~409E070DEA39B187489103BF84BA63BD90D7B9D1 100603~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~401CBB1862D3FBBD318718DE87248A33D776BF79 91816~|~3~|~2~|~02/S<2~|~Urban sytem resurfacing in the City of St. Clairsville; includes curb ramps and auxiliary pavement marking on BEL-40 and BEL-9. Also include drainage items for design of storm sewer on BEL-40 to correct spread problem.~|~05 - 4R Maintenance - Resurfacing~|~B5B02EE042207E7A887685AB99B9D0958FFAFDB5 91816~|~1~|~1~|~01/S<2~|~Urban system resurfacing in the City of St. Clairsville: includes pavement items and long line pavement marking on BEL-40-17.71 to 20.06 and BEL-9-14.62 to 16.07~|~05 - 4R Maintenance - Resurfacing~|~C0CD1E39C9265548D608985D2B7897F95BEF92E8 125462~|~1~|~1~|~01/SAF/ASD~|~Convert two-way stop-controlled intersection into a single-lane roundabout. ~|~21 - Safety~|~45EC28D72F44BFF3D350B0FF760AD382C5EE9895 103590~|~1~|~1~|~01/S>2~|~Installation of fiber optic interconnect cable along Kemp Road from Grange Hall Road to Hanes Road, reconstruction of the existing traffic signal at Kemp Road and Turnbull Road, signal head upgrades, installation of battery backup systems, video vehicle detection, controller upgrades, curb ramp upgrades to meet ADA requirements, and other safety improvements.~|~21 - Safety~|~10A5B36B811209A6A9A1C5CE54470F3D6EB95873 93855~|~1~|~1~|~01/NHS~|~Remove and replace existing overlays (Latex and Microsilica) with new latex modified concrete deck overlay system along with any necessary patching on: SFN 0602469 AUG 116 0132 over USR 33 and SFN 0600237 AUG 33 0419 over St. Mary's River.~|~13 - Bridge Rehabilitation~|~10B40734DBAD7C7D3F1EFDB09FF56B36DA9E91FB 113321~|~1~|~1~|~01/IMS~|~Pavement Replacement on IR 680, reconstruction of IR 680 ramps to and from MAH SR 711 and SR 193, includes culverts and lighting.~|~04 - Reconstruction - No Added Capacity~|~33356749BB6CA8B8ECAD4935209A59472A2B2159 113321~|~3~|~4~|~04/NFA/MACE~|~Resurfacing of Lanterman Rd.~|~05 - 4R Maintenance - Resurfacing~|~64DBE1FAD9E6022BFDDAD214E319E4CF9EE8E120 113321~|~3~|~3~|~03/IMS~|~Bridge preventive maintenance work.~|~47 - Bridge Preventive Maintenance~|~7EB6B8C967297D0F934956452D87D5D7EE03C977 113321~|~2~|~2~|~02/IMS~|~Lanterman Rd Bridge removal and cul-de-sacs.~|~10 - Bridge Replacement~|~D266594875AF5179D6B66B1498B4ED7DF039B77B 116427~|~1~|~1~|~01/MPO/SHAR~|~Upgrades to traffic signals on four routes within the City of Sharonville.~|~21 - Safety~|~2E53493F9381ED9CF5EBB48DA90A7BF8FF6C8D71 116427~|~1~|~2~|~02/NFP/SHAR~|~Upgrades to traffic signals that are not warranted and therefore not eligible for federal funds. Funded locally by Sharonville.~|~21 - Safety~|~19A53D8511748C087778446ABA64B1B49C08B0B4 126616~|~1~|~1~|~01/SAF/STCE~|~Construction of roundabout.~|~21 - Safety~|~8D580824EBC51F93E686FD7725A525F41AAEF69C 115535~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~53E379E16B4CA8928A873CFD37DF639F9333AFF0 121327~|~1~|~1~|~01/NFA~|~Not on Federal Aid system Rural <5~|~05 - 4R Maintenance - Resurfacing~|~87B8675CAE57C25B5E4D10DCD6FCFD5079DE2DD8 121327~|~1~|~2~|~02/S>2~|~STP >200 Split~|~05 - 4R Maintenance - Resurfacing~|~59463AB5DDB63CC680A02E260891C0A361A8D82C 121327~|~1~|~3~|~03/S5K~|~STP >5~|~05 - 4R Maintenance - Resurfacing~|~A3D9120E2E6974E9A3B82E213855CCFDC143C614 121327~|~1~|~4~|~04/STR~|~STP Rural Split~|~05 - 4R Maintenance - Resurfacing~|~98AF9DAB09AA87554578F255325A11D2FAB79F9E 116304~|~1~|~1~|~01/S<2~|~Overlay project.~|~05 - 4R Maintenance - Resurfacing~|~79BFE709D5EA9EC29227F8E641BD113C0277873C 116304~|~1~|~2~|~02/STR~|~Overlay project.~|~05 - 4R Maintenance - Resurfacing~|~101B93C45349AC6DBF4A1C7C33149C6EB9AF7CBC 119024~|~1~|~1~|~01/S>2~|~Plan split for bridge work.~|~13 - Bridge Rehabilitation~|~C93197717E913D1E2FF87DD6843BEE0D0FA10EA0 116055~|~1~|~1~|~01/NFP~|~Plan split for pavement markings~|~21 - Safety~|~2BBB4720DA72333785CA65058570B9247E6EE44D 120931~|~1~|~1~|~01/STR~|~WAS 339-8.57 Two Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~E7C8AA7F4D05B572EB39C7E49A2692175032874A 120931~|~1~|~2~|~02/NFP~|~Resurfacing of the District 10 Traffic Building parking lot. Facilites funded. 100% State.~|~05 - 4R Maintenance - Resurfacing~|~0715E564919AD3A472F0C89CC1982E2735EF5087 88785~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~8406FDE3446366AE8CA7CA5A7EE27EA489B769F6 88785~|~1~|~2~|~02/S<2~|~Bridge Work - 80/20 District Allocation~|~13 - Bridge Rehabilitation~|~96D17DEC84E9A0B1FF26005C2E9BB0AAE5057F00 124589~|~1~|~1~|~01/NHS~|~Major rehab of FRA US 23 from 0.00 to 4.02~|~04 - Reconstruction - No Added Capacity~|~43CED658FC70CDFCC5DB17710EB9DE7D68680E83 106266~|~1~|~3~|~03/S<2~|~100% City of London plan split.~|~05 - 4R Maintenance - Resurfacing~|~68E9F163103E355A9579DD092A248AB86EB8A9DA 106266~|~1~|~4~|~04/S<2~|~Plan split for MAD-56-6.606 culvert.~|~04 - Reconstruction - No Added Capacity~|~02B7CBFB880F84F641F66028D1AE9774F6D1A7CB 106266~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAD-56-6.20-6.35, MAD-56-6.95-7.68 & MAD-38-13.15-13.45.~|~05 - 4R Maintenance - Resurfacing~|~A2C4C3F7AC4A8A9CE4CEE2BF1BDB3A177A6EF3CF 106266~|~1~|~2~|~02/S<2~|~Rural Portion of SR 56: MAD-56-6.35-6.95~|~05 - 4R Maintenance - Resurfacing~|~4349D003655EB54DA7B3172B6CCA97CDEC8C83EB 106266~|~1~|~5~|~05/S<2~|~Storm sewer replacement along MAD-56 in ODOT D6 JURISDICTION.~|~04 - Reconstruction - No Added Capacity~|~10503724C9C08B9A1D1E25F8C08CFBB0A25E7A09 87211~|~1~|~1~|~01/NHS~|~This split is for resurfacing the portion of the project which is on US 33 which is an NHS route.~|~05 - 4R Maintenance - Resurfacing~|~34D1FA56469C26419B3707374B78B597B07517E2 87211~|~1~|~2~|~02/STR~|~This split is for resurfacing work on the portion of the project which is not on a NHS route. This is all the resurfacing on SR 49 and SR 81. The federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~D772B91A433BDFE5C0DB4A1CBEF4720EDD50AF32 108863~|~1~|~1~|~01/NFP~|~Roadwork improvements will also include the widening of SR40 to accommodate a right turn lane going west on SR40 and also a left turn going east on US-40 at the new SR-29 intersection.~|~01 - New Construction~|~02A1D42B93BF31D3D573E967A268E9527F2C55C6 114942~|~1~|~1~|~01/NHS/STRE~|~Resurfacing, urban paving in the City of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~53F987ACFCE650CEBCA684B5474C274127D9F5C6 108043~|~1~|~1~|~01/NFA~|~The City will construct a southbound left turn lane, 1305' on CR25A to the intersection of newly proposed east west roadway at the entrance into the industrial parkway. The southbound left turn lane will be 12' wide including base and wearing course.~|~01 - New Construction~|~104781C18CA0EC0348E25F020ADD44197DC6D824 118185~|~1~|~1~|~01/SAF~|~Safety funded plan split for roundabout~|~21 - Safety~|~0B7CF2182AA28EEF2FB84B565AB613619028C30E 96127~|~1~|~1~|~01/NFA~|~Construct a new 3,000 ton salt storage building at the new Darke County Full Service Facility.~|~~|~4FE6493F01D71A5105EE0225132C53867819B8F5 100663~|~1~|~1~|~01/STR~|~Bridge painting project. WAS 339 2012, SFN 8404380. Rural other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~30C114161F4D49B839B081444A3AA3094CDAFDE9 121001~|~1~|~1~|~01/IMS~|~Plan split for GRE IR 675 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5B3140B55200224E0D46EDB63C647F1B6ADC54BD 115626~|~1~|~1~|~01/IMS~|~MOWING~|~44 - Other~|~86F403E81C1D2B9CEFEF8F655D7F2114EE373F9C 103711~|~1~|~1~|~01/IMS~|~Brent Spence Bridge along with approach spans~|~47 - Bridge Preventive Maintenance~|~1F5D8F6F6837714E78449813C6A55C6BD25F2C67 98532~|~1~|~2~|~02/NHS~|~FY2018 Urban Paving Project in the City of Fairfield. This plan split is for SR 4 where the pay items are 100% City.~|~05 - 4R Maintenance - Resurfacing~|~3EB52B708E47047B8BEDE4F14B442CF3083AEF0E 98532~|~1~|~3~|~03/SAF~|~Safety work for removing the slip right turn lane from SR-4 to SR-4Bypass and making it a conventional right turn lane.~|~21 - Safety~|~FA529D22B42272F59B269C0381628F1E239645F4 98532~|~1~|~1~|~01/NHS~|~FY2018 Urban Paving Project in the City of Fairfield. This plan split is for SR 4 where the pay items are split 80% State and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~C49DBCB20755DE4DF537A3E5A649BA827475276C 114463~|~1~|~1~|~01/S<2~|~SLM 1.72 to SLM 2.56~|~05 - 4R Maintenance - Resurfacing~|~F346E848B92828C1D1780D9B7BD63CFB2495559E 114463~|~1~|~2~|~02/STR~|~SLM 2.56 to SLM 11.36~|~05 - 4R Maintenance - Resurfacing~|~B99CD2254DE3F76F39DFE48D6E1DC1708D999C83 119097~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~ABC2D4D382D81FF42515C8BFC232888075070417 119097~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~F7BC565A01F8B856733E9175CAF83AF06306542E 92207~|~1~|~1~|~01/BRO~|~Raise superstructure to meet 16'6" clearance over IR 75. Remove and replace approach slabs, build up abutment beam seats, backwalls, and pier caps, and adjust ramp terminis to meet new SR 29 profile on SFN 7500157 SHE 75 1471 over Interstae 75.~|~13 - Bridge Rehabilitation~|~19AEA07DC88CDC10A98B6FA5C234F16FC92D916F 96891~|~1~|~1~|~01/NFP~|~Resurfacing of Mosquito Creek State Park parking area. Trumbull County, Ohio.~|~~|~00AD542BAEFE752E4D7077D30A6534006A373B2E 91906~|~1~|~1~|~01/IMS~|~Interstate Plan Split:FAY-71-0.00-9.45~|~05 - 4R Maintenance - Resurfacing~|~FF95CA3F82C742D770FFF03D019F200278FF2ED8 88333~|~1~|~1~|~01/SAE/LANC~|~"01/SAE/OT/LANC" - Safety Funds 4SC7 (80% Federal) / 4BG7 (20% Local) - CAP Funding capped at $584,819 ($728,000 minus $89,338 Env minus $13,875 Dtl Dsgn minus $39,968.00 On-Going) TRC Authorized up to 4SC7 CAP - City of Lancaster SRTS project involving the addition and replacement of sidewalk on various city streets.~|~28 - Facilities for Pedestrians & Bicycles~|~8784BCFC8355E66A504114862EEC3E27780561C8 88333~|~1~|~2~|~02/SAE/LANC~|~"02/SAF/OT/LANC" - SRTS 4SC7 (80% Federal) / 4BG7 (20% Local) -CAP Funding capped at $39,968 TRC Authorized up to 4SC7 Max - Ongoing Engineering during Construction on the City of Lancaster's SRTS project.~|~~|~7A20AD21BEDD651DB936BCF19B891EA026402104 107903~|~1~|~1~|~01/STR~|~SLM 4.52 to SLM 10.08~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7338223F0B27A6D530FEF0C3A0868EEB9B07FF77 107903~|~1~|~2~|~02/BRO~|~Plans split for bridge costs~|~13 - Bridge Rehabilitation~|~4640553456C3EEB98778E42A9D5C46DE95F5EF11 97840~|~1~|~1~|~01/BRO~|~OBPP Replacement of SFN 0730483~|~10 - Bridge Replacement~|~4109BFFE1A64FBD08A99D1193D3BE537F75A01EA 97840~|~4~|~4~|~04/BRF~|~OBPP replacement of SFN 0731625~|~10 - Bridge Replacement~|~4561A7C1930B9FF6D53D012AEF20AEC0E472271C 97840~|~2~|~2~|~02/BRF~|~OBPP replacement of SFN 0732648~|~10 - Bridge Replacement~|~81B32EAA334A8502F99EB389BAEC0E5843C89B71 97840~|~3~|~3~|~03/BRF~|~OBPP replacement of SFN 0732303~|~10 - Bridge Replacement~|~A516EF00EE0DADB4B06AAAC286CB2871DFB56CFC 92583~|~1~|~1~|~01/MPO~|~Multi use trail.~|~01 - New Construction~|~0B92708FD37379F8572E524BE2F2F37EC6BCE65E 117008~|~1~|~1~|~01/SAF~|~Plan split for demolition~|~21 - Safety~|~063762542234D8E3A4795E1D8D28BCBFFC0488E7 109418~|~1~|~1~|~01/STR~|~work to resurface Taylor Wells Rd (CR-28) that is eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~6DB149DF92FBAFFD01F274C2896E8FB95BED65BE 124783~|~1~|~1~|~01/NHS~|~Plan split for Conduit Rehab.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0826149AF878E0951CC286F89F10523A2865F3AA 120402~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~16E843A612EA4D278B5A12692263A9BFA7D9510F 120730~|~1~|~1~|~01/SAF~|~signal upgrades at various locations in the City of Mason~|~21 - Safety~|~F12C190336BD03E8EE5378BAE451AAEE51328152 119757~|~1~|~1~|~01/SAF~|~Installation of sidewalk along a portion of Loveland Madeira Rd within the City of Loveland. Project also includes a mid-block crossing with RRFB.~|~21 - Safety~|~A0E3643910DD545DB78B44E7F231D9AC0C02E0D6 116628~|~1~|~1~|~01/STR~|~Chip Seal for various routes~|~99 - State Preventative Maintenance~|~FA905186E75C56C790E5BCC94D6788AF0894BBFB 125546~|~1~|~1~|~01/MPO~|~rehabilitation of loveland madeira corridor phase 2~|~04 - Reconstruction - No Added Capacity~|~8F4130D6DA51AECEFDBF9AAA55F6AB0E80B03F09 124100~|~1~|~1~|~01/S>2~|~Plan Split for resurfacing on STP Urban functional class~|~05 - 4R Maintenance - Resurfacing~|~E78D15EE17EC3A3D3C5224C59287DEB823736EB8 124100~|~1~|~2~|~02/STR~|~Plan Split for resurfacing in STP Rural functional classification~|~05 - 4R Maintenance - Resurfacing~|~2C332FC7F8C2F7ECFDEA4EDBDD81E2AE7B35D546 114568~|~1~|~1~|~01/STR~|~Chipseal on SCI 73~|~05 - 4R Maintenance - Resurfacing~|~CA2C37A6210CBF2F9CA9D552A37202B1F89D9A64 91738~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 733 0.00-0.25 Urban, Federal aid, 80% Federal and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~CABD91F66161A893972124FAE159DD585FD8F647 91738~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment. MEG 7 11.35-14.58. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~EC5660FB9F5FCAF485A6B943B546B09F8CE23D9C 116603~|~1~|~1~|~01/IMS~|~Interstate plan split for resurfacing and resurfacing related items on FRA-270.~|~05 - 4R Maintenance - Resurfacing~|~0647C67100CBB08DD1D09DF4B4E106768CE8E05F 96778~|~1~|~3~|~03/S<2~|~HUR-61-20.56-23.76 WAY-3-8.67 to 9.07~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BDF749A535E7C539A52554FE45EEA28EA13A64FC 96778~|~1~|~4~|~04/IMS~|~LOR-480-1.05 to 2.17~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~481FBEF06179BE75EDA7112B3F9CF4682BB0DDA7 96778~|~1~|~2~|~02/STR~|~CRA-4-11.26 to 18.65/19.55 to 22.20 HUR-61-6.70 to 12.08/23.76 to 23.92 HUR-99-15.00 to 17.88 WAY-3-0.00 to 8.67~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~189760EC23C6FEA735239DF6AC92712DCD6A2021 96778~|~1~|~1~|~01/NHS~|~HUR20-2.70 to 6.79LOR-2-8.01 to 11.14RIC-30-0.00 to 4.07WAY-3-9.07 to 10.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E6A6B4EA4593DE0069F9053E6938C6C12275A1A0 122284~|~1~|~1~|~01/SAF~|~All work included in this split.~|~21 - Safety~|~64060E9A09185A8C04E86B5E1A9CE2ECE9DB9858 123929~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BC92138D67844E249B4B5371429EBE9B72C88313 111724~|~1~|~1~|~01/STR~|~Slide repair along STA-SR 225 at 2.65.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2CE35F3DDCE427B9B2A81A34C122970B56FA4364 102778~|~1~|~1~|~01/IMS~|~District wide mowing D07 FY18/19~|~44 - Other~|~605F01609F1F34D488DFC0D51C5D0AA377DAFCA0 102778~|~1~|~2~|~02/IMS~|~Mowing contract with D08 for Preble County FY18/19~|~44 - Other~|~33FB224222FC7D182EB66CE88772A2B1AACEE032 86869~|~1~|~1~|~01/BRO~|~Replace the existing four sided box (COL-164-0980, SFN 1503979) with a new four sided box. The bridge carries SR 164 over branch of Little Beaver Creek.~|~10 - Bridge Replacement~|~06D6203F9D0BED2EEC1B43FC43D6CBA1E2E36500 122717~|~1~|~1~|~01/S>2~|~Plan Split for MPO STBG funded scope.~|~04 - Reconstruction - No Added Capacity~|~AE52118792C45C64AA7F80F8EB89E60CC0F8CB4E 122717~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded project.~|~04 - Reconstruction - No Added Capacity~|~CCD05BFC717853FCAA70D5AAEC733DC6F23BFDF1 114176~|~1~|~1~|~01/NFP~|~Split for bridge steel repair work~|~47 - Bridge Preventive Maintenance~|~EACCE0B8AFBCBC6DCB9EFC5D7378E593BDAB4C7B 96544~|~1~|~1~|~01/STR~|~Maintenance contract for SFY 2019 herbicidal spraying.~|~~|~F6B2DFFE944B64593E7B6EAF763A8072655EED96 105830~|~1~|~1~|~01/NHS~|~Plan split~|~44 - Other~|~CE906547A15CF300A15E70F6CFDF927E39D94248 97118~|~1~|~1~|~01/BRF~|~SFN 8730008 SFN 8738793 SFN 8734895 SFN 8736766 SFN 8742650~|~10 - Bridge Replacement~|~5E0CA31B9EC8EEE5FD6B3BF44B88FDCB04C63482 115486~|~1~|~1~|~01/SAF/Cols~|~Construction of a pair of bump-outs, enhanced crosswalks, signage, and RRFBs at two intersections on Summit Street at 3rd Ave and 8th Ave~|~21 - Safety~|~4D717986C6DC00E5E6152962C402D2C52CE51FA9 113316~|~1~|~1~|~01/MPO~|~Resurface approximately 15 miles of the Ohio Erie Trail with 1.5? asphalt, repair root pop areas, berm and stripe path.~|~28 - Facilities for Pedestrians & Bicycles~|~EB473A4ED567DE0D4200EECA1F079E877A0DAF19 113316~|~1~|~2~|~02/NHS~|~Plan split for the retroactive change order for fuel price adjustment.~|~28 - Facilities for Pedestrians & Bicycles~|~33B0C77ECC8582D3EB1DBEBBBE0DA22C6076E7B6 83042~|~1~|~1~|~01/NHS~|~Resurfacing of MAH SR 11 from 8.46 to 16.19.~|~05 - 4R Maintenance - Resurfacing~|~5D83F1AD151F0C95DEDD1ECA08CE3FD9C6A8ACB4 83042~|~1~|~2~|~02/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~B58BB34A16EF07D3B1829C8FD3A176A8DAC5845D 83042~|~1~|~3~|~03/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~9A65E1FB8DD6EB3CB1FBA82C5492E09BCDE5530C 126422~|~1~|~1~|~01/BRO~|~Bridge deck overlay.~|~13 - Bridge Rehabilitation~|~52FC87C0E37D3C4368659D96A514AF0147645F83 85096~|~1~|~1~|~01/NFP~|~This split is for state funds.~|~04 - Reconstruction - No Added Capacity~|~62DBCCC48092B7677C961BDA0CB70052F3B5ABD6 125974~|~1~|~1~|~01/STR~|~Plan split for resurfacing on SR-18 & SR-65~|~05 - 4R Maintenance - Resurfacing~|~F0AD7A792EB6EC34ACBFA964341635737D7CD9C5 117188~|~1~|~1~|~01/NFA~|~D09 Overhead Flasher FY24.~|~44 - Other~|~C0B69919D667F626299C7CB184C9BEF2E4D52BD8 115465~|~1~|~1~|~01/ENH~|~Trail (SUP) resurfacing and repair utilizing Federal TAP Funds at 95%.~|~28 - Facilities for Pedestrians & Bicycles~|~4E165AB75C5CEF84D685852FBEA9F603DEACAC2C 84546~|~1~|~1~|~01/CMQ/Kent~|~Install coordinated signal system, add center median to restrict turns and discourage midblock pedestrian crossing, improve intersection at Lincoln Street and improve profile/grade of Summit Streets east of Lincoln Street intersection, in the City of Kent, Portage County, Ohio.~|~21 - Safety~|~DD1884C5131193FD9669EB3EC82829A8AEABF144 84546~|~1~|~2~|~02/CMQ~|~100% City funded items.~|~21 - Safety~|~B464D7D8164B35A2BA5034B06E2270D400C0E2C0 84546~|~1~|~3~|~03/MPO~|~MPO funding for Enhancement Items.~|~31 - Landscaping & Other Scenic Beautification~|~0405B1E688EE0280D748ECAC4EF81F3CECCFBD91 100661~|~1~|~1~|~01/NHS~|~100% City of Maumee funds~|~05 - 4R Maintenance - Resurfacing~|~1AD1D182BA7222448DDDB06B5D2121E7FA3AE306 100661~|~1~|~2~|~02/NHS/Maum~|~LUC-US20 from SLM 18.62 to SLM 19.12 (federal/ Local)~|~05 - 4R Maintenance - Resurfacing~|~6A9BA8D3DBEB8DBDFA8B3E98CB3899D7B1565D9E 95760~|~1~|~1~|~01/NHS~|~Plan split for resurfacing from SLM 12.84 to 17.878~|~05 - 4R Maintenance - Resurfacing~|~5437BF4FE980CB24ABCFDF911C3CCC0452E3F226 122186~|~1~|~1~|~01/SAF~|~CEAO HSIP funding for roundabout~|~21 - Safety~|~07C478FDE759A90F3F8218017D69C2D389E37276 97984~|~1~|~1~|~01/IMS~|~Resurfacing BEL-470 with asphalt concrete; including asphalt concrete overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~8EFD36FA85396C4CE0DFE2AC01A7A150E05F45BD 125930~|~1~|~1~|~01/S>2~|~ITS Maintenance~|~44 - Other~|~88FE3849F6EAD9076C0687FAD4FE7327BBD763C8 87266~|~1~|~1~|~01/NHS~|~PIK US23 0.00 - 8.37~|~05 - 4R Maintenance - Resurfacing~|~4DF306C1F234AE020BF345DB7321DABFFB85A9D2 102707~|~1~|~1~|~01/STR~|~This plan split is for Bridge replacement on rural route.~|~10 - Bridge Replacement~|~DD83492B721A8A663CCE3CF121A6601524CDEFEF 114065~|~1~|~1~|~01/SAF~|~Convert TWSC intersection to single-lane roundabout~|~21 - Safety~|~2C2138963E3A6257370360E7C6E11AC1A0B8C602 114065~|~2~|~2~|~02/SAE~|~Convert TWSC intersection to single-lane roundabout.~|~21 - Safety~|~9E76994CE170BC0AD5F1B0E50F6EBDA9868A4AF5 126710~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE CR 40 5.60.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~40314DF13FE7C32CF1CB6E9DFB4E7C6FDEE8C14C 120395~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~837B788E73253E58CB0CD8E673C0F58DBC90FDE6 99510~|~1~|~1~|~01/S>2~|~US 68 to Springfield Corporation Limit - Rehabilitate the roadway and bridge on Springfield-Xenia Road.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FEAF97528CDBD73C8EAD9E214C23A26ED848B404 119100~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6383991F725910ACFCD450300081CE93DB545988 108167~|~1~|~1~|~01/NHS~|~ER event OH18-01. Landslide repair on ATH US 33 13.33 W, DSR ATH-006. NHS route funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F5A7CD0D8909B457D7DBD2854FFA18B8185B1C6 124456~|~1~|~1~|~01/ENH~|~Shared use path utilizing 100% Federal funds (TAP and Safety) up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~0CDF01734171A9B1C3794A91AD949A66F37A2B18 98692~|~1~|~1~|~01/NFA~|~MOT SHPWB 20 (SFN 5761603) Shoup Mill Road bridge rehabilitation Rehabilitate existing 2-lane, 3-span plate girder bridge carrying westbound Shoup Mill Road over the Stillwater River. Replace existing reinforced concrete deck and approach slabs; investigate conversion of conventional abutments with sliding plate expansion joints to semi-integral design. Install pressure relief joints at ends of approach slabs if converted to semi-integral bridge. Patch deteriorated concrete surfaces on abutments and restore dumped rock channel protection at abutments.~|~13 - Bridge Rehabilitation~|~03D77902497E4DF2FC5503B21DE1DAE707DDD3F5 96524~|~1~|~1~|~01/STR~|~Adding one extra lane in each direction~|~03 - Reconstruction - Added Capacity~|~3B7D324FC9CB5B6D8783B0235FC4ECDF9E9A30B1 121584~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C1A894FEF94E5AAF513C2EA1277D694D590C9376 95633~|~1~|~1~|~01/NHS~|~It is proposed to demolish the houses.~|~01 - New Construction~|~A220B83088186794736B891D211DE1BD93B5F8CF 105348~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 7: Round 2 of repairs to the existing WHV including deck overlays, expansion joint repairs, concrete patching, beam painting, etc.~|~13 - Bridge Rehabilitation~|~61CC6790D93E9E6DC902F7B26A8F39D36BDFC3D4 88214~|~1~|~1~|~01/BRF~|~Replace Broadway Street Bridge over Wolf Creek SFN 5760712 MOT MR**C 0.00~|~10 - Bridge Replacement~|~3EDE11045E6EB67CBA5D6C3A75984E104C014B9F 92624~|~1~|~1~|~01/MPO~|~Pavement Patching, Crack Sealing, Microsurfacing and Pavement Markings on North Street from Bever Street to Beall Avenue in the City of Wooster using Large City funds~|~05 - 4R Maintenance - Resurfacing~|~2893E7C969752E6D923D38226207C6F2FB95660F 92624~|~2~|~2~|~02/MPO~|~Added split for 100% local items. Curb Ramp, as per plan Type A and Curb Ramp, as per plan, Type C~|~05 - 4R Maintenance - Resurfacing~|~D60A46730DAFAF547353C425AE4B0F580B193303 105784~|~1~|~1~|~01/STR~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on OFAH-Rural routes~|~21 - Safety~|~673EBE2F510C4CDFDFFF27B199720EBBA3D3E3F3 105784~|~1~|~2~|~02/NHS~|~District Preservation Funding. - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on NHS routes~|~21 - Safety~|~A563DF04C4C4A13BED403F5694815D1DCB93B34C 105784~|~1~|~3~|~03/S5K~|~District Preservation Funding. 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail repairs on STP 5,000 - 49,999 routes~|~21 - Safety~|~B0C0EBABD037363C9BD6F3EAAB8AC4C7B0BBA153 89367~|~1~|~1~|~01/STR~|~Slide repair~|~44 - Other~|~02EEB4FB663183449D4D09BD3D305BD9911C8889 103418~|~1~|~1~|~01/S<2~|~Widening, resurfacing and enhancements on County Road in the City of Kettering.~|~03 - Reconstruction - Added Capacity~|~9D7B8D2F0DE3B17462384666F00F57DB8A54D6C7 103418~|~1~|~2~|~02/S<2~|~Widening, resurfacing and enhancements on County Road in the City of Beavercreek.~|~03 - Reconstruction - Added Capacity~|~0A92AD3EA2B854E92B50FC9BE54D23F60050596B 111605~|~1~|~1~|~01/STR~|~Profile correction to improve the stopping sight distance along SR 39 near an entrance to a landfill operation.~|~04 - Reconstruction - No Added Capacity~|~B2FC9586528FC78070D7B30660D9D382F8F8B790 107373~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - District 5 Mowing contract on Interstate and Interstate look-a-likes~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~37D05248DBE6FD8A607F04AA0CBFEC85DAE3A74D 119176~|~1~|~1~|~01/NFP~|~Plan split for resurfacing parkways and parking lots in the Brookside & West Creek Reservations eligible for State Metropark funds.~|~05 - 4R Maintenance - Resurfacing~|~71A05880EF9CA5B1122B745F28356C531ECC3A4B 119176~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% Local cost.~|~05 - 4R Maintenance - Resurfacing~|~533AC8848EF6924A34884B876E64A7B0AD7E9D28 110714~|~1~|~1~|~01/NHS~|~Using district preservation allocations.~|~05 - 4R Maintenance - Resurfacing~|~C9337CAA83F51C230A324C19891BC4AB9AD8C896 112653~|~1~|~1~|~01/MPO~|~Resurfacing of Painesville-Warren-State Rd from GEA County Line to SR 534.~|~05 - 4R Maintenance - Resurfacing~|~82FCC9C43AC8A62634D1CB1C88D9FC59AFEDBD76 96311~|~1~|~1~|~01/NFP~|~Type A emergancey to fix the pavement on I-75 due to an accident~|~05 - 4R Maintenance - Resurfacing~|~DEF48974894747428C1DDD1A1327BADEFBD63BC4 96320~|~1~|~3~|~03/S>2~|~District Preservation Conduit Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Rehabilitation of culvert located at LIC-40-5.796.~|~13 - Bridge Rehabilitation~|~DD94E0EB8480DE9F7D245E7560229514F5903C60 96320~|~1~|~4~|~04/STR~|~District Preservation Conduit Funding - 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP) - Rehabilitation of culvert at LIC-40-7.54.~|~13 - Bridge Rehabilitation~|~D719CCC20B0FE79563132CD4F2FF400463CED21A 96320~|~1~|~5~|~05/IMS~|~District Preservation Bridge Funding - 4PF7 (Federal 90%) / 4PS7 (State 10%) - No CAP - rehabilitation of the Fai IR 70 00.85 L & R structures~|~13 - Bridge Rehabilitation~|~C5F39C8D17DF807695B4BCBB29DAAB69960BCFD3 96320~|~1~|~1~|~01/S>2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Bridge Rehabilitation: 1) SFN 4502019, LIC-40-0.15 carrying US 40 over Blacklick Creek. Not BR Eligible for Rehabilitation: Length=18; SD/FO = (1); SR = 55.4; DSR =N ; 2) SFN 4502043, LIC-40-2.65 carrying US 40 over Sycamore Creek. Not BR Eligible for Rehabilitaion: Length=18; SD/FO = (0); SR = 72.1; DSR = N;~|~13 - Bridge Rehabilitation~|~BA92178CE1C4147BCAF47BDB16D2BFFE9078A0FE 96320~|~1~|~2~|~02/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge rehabilitation on 4502078 LIC-40-6.80 Intersect: Over Ditch; Not BR Eligible: Length=17, SD/FO(0), SR=72.5, DSR= N;~|~13 - Bridge Rehabilitation~|~296ECADE2438F8BA00ECA94CB89DAC25BCBB9A15 109521~|~1~|~1~|~01/CMQ~|~Reconfiguring SR 82 and Howland Wilson Rd intersection.~|~~|~21E5A5FBE809AE35C9360D86105BADEE1AEE679C 114468~|~1~|~1~|~01/STR~|~Resurfacing SR 151~|~05 - 4R Maintenance - Resurfacing~|~A01F12DEBCE935FF6C4581FC3C10E81D70DAA18E 107263~|~1~|~1~|~01/NFP~|~Gas line replacement at W. Broad St~|~44 - Other~|~7D152831E308C77098E76666FF8230FA1360F68D 106927~|~1~|~1~|~01/SAE~|~BRO US 68 44.48~|~21 - Safety~|~9C7F626C7C6113074BADB0FB305796C5646AC03B 95002~|~1~|~2~|~02/NFP~|~All costs for the new pole building in Van Wert County.~|~44 - Other~|~8524B6DA0672547FED5821B1886E3499D42CD547 95002~|~1~|~1~|~01/NFP~|~All costs for the new pole building in Hardin County.~|~44 - Other~|~8BFAE73DB71B28474DDDA5DB31A41815BFC04E98 95002~|~1~|~3~|~03/NFP~|~All costs for the new pole building in Defiance County.~|~44 - Other~|~F5AB8CE3673782B9F6BEF841770367C860BDC625 101148~|~1~|~1~|~01/NFP~|~A district allocation funded project to maintain/upgrade existing traffic signals distric wide.~|~44 - Other~|~F37E0F15A7293A62B88552F028F7A10A14486E63 100390~|~1~|~1~|~01/IMS~|~"01/IMS/CV/ " - Districty Preservation Culvert Replacement - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Lic-TR 152-01.08 associated with SFN 4503066 (Lic-IR 70-05.67)~|~04 - Reconstruction - No Added Capacity~|~D053B06CC3461FE4F36B67BFC71024A40474CBFD 105596~|~1~|~1~|~01/IMS~|~IM funding for pavement reconstruction, no added capacity. Includes work on High St, Fulton St, and Livingston Ave~|~01 - New Construction~|~E89E5B865C8BC0888BDA1E306DE23CAD84AFE387 105596~|~1~|~2~|~02/IMS~|~IM funding for structure replacement, no added capacity: FRA-70-14.05C New SFN 2510024 (S High St over 70/71)"~|~~|~C254F54F07E696C2C376788A32AA4B82A1BFC83E 105596~|~1~|~3~|~03/MPO~|~MORPC/Columbus funding for aesthetic enhancements on High St bridge caps~|~~|~143A80AA61E3397809A5BDBA5B4A8C5733FA4E04 105596~|~1~|~4~|~04/IMS/Cols~|~Items to be paid with 100% City of Columbus funding~|~~|~DF90E570FF727BD08A2C81BD2E331DABC19D4F99 105596~|~1~|~5~|~05/ENH/Cols~|~Incremental items - Columbus to pay the difference above standard items including brick paver crosswalks, granite curb, light poles, luminaires, signal supports~|~~|~4DBC47C12031C53351B9C2774356F2BD8B1BFDF6 105596~|~1~|~6~|~06/IMS/Cols~|~100% AEP items to be done as part of the project~|~~|~7B5DFF4A1CA6ACCFD75F8FDC3703EF28F3573461 105596~|~1~|~7~|~07/IMS/Cols~|~100% AT&T items to be done as part of the project~|~~|~342B84DEA4BE7983E9830847B882EF089FA1AD5E 121823~|~1~|~1~|~01/MPO~|~Plan split for eligible resurfacing work.~|~05 - 4R Maintenance - Resurfacing~|~7C3D59E17C0CA8C58DC45092FACDB72F38F1A800 83522~|~1~|~1~|~01/NHS~|~Construct Drainage system, including catch basins and paved gutter along SR7 in Duffy. MOE-7-11.50. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4AA71FD2536D51A8158F4CC38A82DA195792470C 91622~|~1~|~1~|~01/IMS~|~Split for interstate locations - FRA-70, 71, 270, 670~|~05 - 4R Maintenance - Resurfacing~|~1335F6AADB2812F3BA54765DFEA0293D0D5F10A2 91622~|~1~|~2~|~02/NHS~|~Split for NHS locations - UNI-33~|~05 - 4R Maintenance - Resurfacing~|~842D903693E1FF2552346BEB2674EF2466370673 98127~|~1~|~1~|~01/NHS~|~Rock hazard removal. WAS 7 42.40. Type A Emergency Project. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B9DE45DDB8DC460991894CE37C855302FB1EF4BA 101866~|~1~|~1~|~01/NFA~|~ADA VAR CR~|~21 - Safety~|~9408A8F0BB137B9EB7B4905068750A2B630174D5 96795~|~1~|~1~|~01/STR~|~General System resurfacing of BEL-147 from SLM 13.23 to SLM 13.61 including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~372669AD8759686C4C401ECD3178580FEB4871B1 96795~|~1~|~2~|~02/NFA~|~General System resurfacing of BEL-147 from SLM 13.61 to SLM 19.50 including pavement repairs and pavement markings.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~39DA7AAE8EA9A6999B39331F6240B43FBDD71099 125414~|~1~|~1~|~01/MPO/MAR~|~Installing a U-turn at the intersection of SR 423 and Barks Rd.~|~21 - Safety~|~FD543BC2242F2C04F5A80E2CC35C043E3662FA6C 126211~|~1~|~1~|~01/BRF~|~Bridge Replacement ~|~10 - Bridge Replacement~|~4C1879F70C020233A5537C03A91F9B9D22645D15 23961~|~1~|~2~|~02/NHS~|~80/20 fed/state funding split for all bridge work.~|~05 - 4R Maintenance - Resurfacing~|~20675EF59AD1E8EA96259FEA887D813367961E5D 23961~|~1~|~1~|~01/NHS~|~80/20 fed/state funding split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~84ACA8293BFA383E28E83E0148701BAB96E8006F 92126~|~1~|~1~|~01/STR~|~resurface FUL US 20A 3.01-12.06 and SR-66 from 7.09 to 8.73~|~05 - 4R Maintenance - Resurfacing~|~2E122BD98A556E29D996259778C9A8CFE94E1371 92126~|~1~|~2~|~02/S<2~|~FUL US 20A 12.06-12.33 Urban Oth~|~05 - 4R Maintenance - Resurfacing~|~F6CFE9064F9DD49A228994D57901A0E8D60038BC 92126~|~1~|~3~|~03/STR~|~Culverts on US-20A @ SLM 7.59 & SLM 10.46~|~04 - Reconstruction - No Added Capacity~|~703A5FDED9419FC5B62B504F0145223987E0364C 92126~|~1~|~4~|~04/STR~|~Bridge on FUL-20A @ SLM 0.80 & FUL-66 @ SLM 8.53~|~13 - Bridge Rehabilitation~|~836C17F06381F77797775F3C875A2A62E58879A6 92126~|~1~|~5~|~05/SAF~|~Plans split for Safety funds to install Centerline Rumble Strips~|~21 - Safety~|~963B189455A14E66046D8B57DD350EBBAEF96A02 99374~|~1~|~1~|~01/STR~|~SFN 1900765, DAR-47-2044 on Bakertown Ditch-remove asphalt wearing surface and waterproofing from non-composite box beam single span structure. Install SDC hard overlay (non-composite) system. SFN 1901486, DAR-49A-0194 & SFN 1901516, DAR-49A-0238 on Painter Creek - remove asphalt wearing surface and water proofing from non-composite box beam structures. Install SDC hard overlay (non-composite) system.~|~13 - Bridge Rehabilitation~|~ABEB492520C2BC615E19F8F8CBC308FD738B2D89 91935~|~1~|~1~|~01/IMS~|~Delete temporary split.~|~~|~619BB19F35F4C3DADBB34A3375F8DA074DA01792 88798~|~1~|~1~|~01/IMS~|~IR 71: From 3.62mi to 3.57 mi. South of the Clinton County line. Rehabiltate Bridges WAR-71-1866L/R by replacing the rigid overlay and performing other minor rehabiltation work. SFN 8302405 & 8302375.~|~13 - Bridge Rehabilitation~|~AD9E4736884CF20824F720FD2827C7FDF31B4D47 114711~|~1~|~1~|~01/STR~|~Overlay on VAR routes.~|~05 - 4R Maintenance - Resurfacing~|~05CA0D2B52F1D4C874E75872488ADF7F7A59704E 114711~|~1~|~2~|~02/S<2~|~Overlay on VAR routes.~|~05 - 4R Maintenance - Resurfacing~|~D840B5B2F85265D67E74AEBDB55F669A8B132E68 114711~|~1~|~3~|~03/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~23E90746D6C9168541F091B6FB2EEAD73FBEF77E 114711~|~1~|~4~|~04/S<2~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~C785B976A96A162286E2CEECCFAAB71F3C5D46FC 94977~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~44 - Other~|~328971AAC4CA8C2B1AD33E5BB36B826A90093736 124154~|~1~|~1~|~01/BRO~|~Plan split for bridge work on eligible system~|~10 - Bridge Replacement~|~EF38F092D323AA7A5912978FB75BDA4E878903EE 107158~|~1~|~1~|~01/STR~|~Geological Site Management Funding - 4SF7 (80% Federal) / 4SS7 (20% State) - See CAP Comment - Rock scaling work on MUS SR 146 from the 31.42 to the 31.49.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AEBBE3B91904DD49E71587B17EBCE1315C9BC609 107158~|~2~|~2~|~02/NFA~|~Geological Site Management Funding - 4SS7 (100% State) - See CAP Comments - Rock scaling work on MUS SR 340 from the 3.26 to the 3.32.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8D4B569DE6B4096E04EBABD7205E1F91483BA223 124502~|~1~|~1~|~01/NHS~|~Replace structure DEL-42-1.953 over the Scioto River with a wider structure.~|~10 - Bridge Replacement~|~C34BB784B5CF191764DBB6A80785641275E2DBC2 100956~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F6B2FFF3B57D88A73F46642E7C954A1E4151B065 105923~|~1~|~1~|~01/SAF/LCEO~|~Licking County Engineer HSIP Funding - 4HB7 (100% Federal) - See CAP Comment - Project to install new and upgrade existing guardrail on various county roads.~|~21 - Safety~|~FA1AD4B99EF0132D3A61C388143EF21824DCABA7 99192~|~1~|~1~|~01/NFA~|~Highland County Various Routes Guardrail~|~21 - Safety~|~D911EB0433E5B8F5F3E2EDCB0B10BA518C9FD032 110325~|~1~|~1~|~01/STR~|~Landslide repair project on WAS SR 26 28.96. 100% State ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7847DE10D13E40505554D881AB1B67B61D0C6674 96834~|~1~|~1~|~01/BRF~|~Work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible. 80% federal funds from the County Engineers Association of Ohio (CEAO) and a 20% match provided by the Van Wert County Engineer.~|~10 - Bridge Replacement~|~719EA784A7383B93C48805A3030F839BB0EF8744 95678~|~1~|~2~|~02/S<2~|~This plan split is for the items that are 100% City funded items on the Urban Paving project on W. Dayton Dr.~|~05 - 4R Maintenance - Resurfacing~|~BB47BA63D5962BF7025E65ACB5B223B7D9F9E0BA 95678~|~1~|~1~|~01/S>2~|~Urban Paving in the City of Fairborn on W. Dayton Dr. which will be the relocated SR 444 once WPAFB closes the current SR 444. This plan split is for the items split between the State & City at 80/20.~|~05 - 4R Maintenance - Resurfacing~|~EF3AC2300447165F0834CC01ADE6B69A31B68E95 121463~|~1~|~1~|~01/SAF~|~Address safety and access management concerns for 9 intersections along HOC US 33 0.00-4.75. HOC 374 25.00-25.154, HOC 180*IC 0.09-0.166. HOC 180 16.49-16.54.~|~21 - Safety~|~C16A8026C59AEE1388D4000555F0091D49598DE6 100847~|~1~|~3~|~03/SAF~|~Pavement marking project for FY2021. Funded 100% state.~|~21 - Safety~|~63021E7E4FFBD886B51FC4388CDCE3788B9EC8FF 100847~|~1~|~1~|~01/IMS~|~Pavement marking project for FY2021 on Interstate routes funded 80% Federal/20% State.~|~21 - Safety~|~493F18BD63FC686AD9234E9F6FBF456992E72A8F 100847~|~1~|~2~|~02/NHS~|~Pavement marking project for FY2021 on NHS routes funded 80% Federal/20% State.~|~21 - Safety~|~2E3A2A14186C82BBCD750C98B77344677E759D59 110597~|~1~|~2~|~02/S<2~|~Urban Plan Split: MAR-309-14.50-15.35~|~05 - 4R Maintenance - Resurfacing~|~0F37C35A196EEC828A9AC9C4CDD8A061EED84FBD 110597~|~1~|~3~|~03/STR~|~Repair and asphalt overlay on several bridges~|~47 - Bridge Preventive Maintenance~|~FA42AA1A644CD2CAD40F2E09F65EB1A18B7B0BA9 110597~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-309-0.00-14.50~|~05 - 4R Maintenance - Resurfacing~|~B549B86AF79BE5B870BCE7B4A471D43CB479E355 119640~|~1~|~1~|~01/NFP~|~Task order PID for CE/INS~|~17 - Construction Engineering~|~E2E862DEFFBE7FA0393F8EEE29A4CEC9CC682637 117407~|~1~|~1~|~01/SAF~|~Plan split for construction~|~21 - Safety~|~8F6D9CD2609BFE7FCB3D20D82A60354B9FD2B2EC 117407~|~1~|~2~|~02/STR~|~Plan split for 100% local items not eligible for safety funding~|~21 - Safety~|~85C7B106CBA100D756CD1D8A5190F70FC4FBAC04 91486~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. NOB 145 0.00-8.94, WAS 145 0.00-3.25, and WAS 555 7.71-19.41. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A4D23710A4473F441CB653EC8A7BE7939E8C0D6A 102986~|~1~|~1~|~01/STR~|~AC Overlay with repairs; Also include full depth removal and replacement on pavement approaches to bridge carrying SR 54 over I-70~|~05 - 4R Maintenance - Resurfacing~|~E86213AAB4092887232B4FBA2802CD6341EA095D 102986~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~76E3C04F3630FE0C3AA0A63BEE0D08C4D683913B 120879~|~1~|~1~|~01/CMQ/FAIR~|~OKI CMAQ funded construction of a shared use path project. 30% local match required.~|~28 - Facilities for Pedestrians & Bicycles~|~B6992C5320B2CF46D8685B7155F1FF9C50BBC5A9 81725~|~1~|~1~|~01/IMS~|~Priority paving on TUS Interstate 77 from SLM 20.73 to SLM 27.72~|~05 - 4R Maintenance - Resurfacing~|~1BC15CD1396F7F00F9F9BA0D5B7294A8FD8ABCF9 81725~|~1~|~2~|~02/NHS~|~NHS paving on TUS United States Route 250 from SLM 11.88 to SLM 12.79~|~05 - 4R Maintenance - Resurfacing~|~8AB4B36B9D208E1EE62839E3CC05BEDC796301AC 81725~|~1~|~3~|~03/IMS~|~Project includes the rehabilitation of bridge TUS-250-1232R (SFN 7904835). The rehab work involves replacing the concrete parapet and the deck edges.~|~13 - Bridge Rehabilitation~|~C6AA50C7547313D82DCED1684D5DAE8F51E7788F 105463~|~1~|~1~|~01/IMS~|~AC Overlay with repairs on IR 70 from SLM 7.63 (west of Wilson Rd) to SLM 11.21 (US 40-Broad St)~|~05 - 4R Maintenance - Resurfacing~|~94B87CE36B3C7DB41CB2BC169D2B77E51D06B967 105463~|~2~|~2~|~02/IMS~|~Repairs and deck overlay on several bridges~|~13 - Bridge Rehabilitation~|~B9B688A70F4A9F22496EFAFA7EB1010485DD68BF 105463~|~2~|~3~|~03/IMS~|~Replace deck on structure FRA-70-10.17L (SFN 2504510) over harper Rd~|~13 - Bridge Rehabilitation~|~742ACC8D769A3E5F8A0790F3A08D248A1D233A07 105463~|~2~|~4~|~04/IMS~|~Repair of damage to FRA-70-10.17 R over Harper Rd due to a vehicle accident~|~13 - Bridge Rehabilitation~|~C43B7718FC6D6CABE0415BF6750E8467C1D99A04 117386~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~4FE6A1D2360DA811FC2B6DBD48AA4F22194572C2 110322~|~1~|~1~|~01/MPO~|~Reconstruction of Monroe Street~|~04 - Reconstruction - No Added Capacity~|~244AE272A527DA07163DA46C177BD49F1B346D58 93577~|~1~|~1~|~01/MPO~|~STP Resurface Coumbus Ave.~|~~|~496ACC02AAB5DACB87F2590DEFA31B62DE44063E 93577~|~1~|~2~|~02/MPO~|~TE Resurface Columbus Ave.~|~~|~8F8FC0DF7E98185D6A134D4EADF4A9BBD434E6F5 118971~|~1~|~1~|~01/SAF~|~Plan Split for HSIP funding~|~21 - Safety~|~FED43BC5AE0B913B0E58E4CF8495EE9223289905 113340~|~1~|~1~|~01/S>2~|~Construction of a new sidewalk along West Stroop Road on the north side from Stonebridge Road to Ridgeway Road (no existing sidewalk in this section)~|~28 - Facilities for Pedestrians & Bicycles~|~7DC007DE70208F9667FF8C98D8C0D256EDD1504E 98909~|~1~|~1~|~01/S>2~|~Bennett St~|~04 - Reconstruction - No Added Capacity~|~A4DEE46A82E9698B1035B81E96307D15093D058C 124888~|~1~|~1~|~01/NHS/NFRA~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8282E013AFF9BB28A7E3E5F6936B070663E9646F 124888~|~1~|~2~|~02/NHS/NFRA~|~Sidewalks, excavation, subgrade, curb ramps, catch basin, partial depth repairs and seeding.~|~04 - Reconstruction - No Added Capacity~|~E264952B93B1E0F5279891EFC6E5898B5806B8F1 86245~|~1~|~5~|~05/NHS~|~"05/NHS/PV/ " - District Preservation Paving 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP ? Concrete pavement repair and replacement on LIC-16 RA 45079 between SR 13 and SR 13D~|~04 - Reconstruction - No Added Capacity~|~AC0B9DEDAE58F3F82FAF1A13647D0D09DDA8755E 86245~|~1~|~7~|~07/ENH/NEWA~|~"07/ENH/BR/NEWA" Transportation Alternative Funding 4B37 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $550,000.00 4B37 - For various enhancements to the new bridge structure.~|~44 - Other~|~F9B8B1C431B316772EA8D53007326CDFEBB2E2EC 86245~|~1~|~1~|~01/NHS/NEWA~|~"01/NHS/OT/NEWA" - City of Newark Water & Sewer work 4PH7 (100% Local SIB Loan) - No CAP - Replacement of water and sewer lines.~|~44 - Other~|~A3480F9A37B571B680066515883A276BE9C30C3D 86245~|~1~|~4~|~04/NHS/NEWA~|~"04/NHS/PV/NEWA" - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Newark on Lic-SR 13-9.69-10.29~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CD997DEAA99762C587BC4EDA2C9EC9D6EE711DBD 86245~|~1~|~2~|~02/CMQ/NEWA~|~"02/CMQ/PV/NEWA" - LCATS/City of Newark Funding 4TB7 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $2,500,000.00 4TB7 for Construction ? Roadway improvements to SR13/13D: Lic-SR 13D-00.00 to 00.31; Lic-SR 13-09.69 to 10.29;~|~04 - Reconstruction - No Added Capacity~|~779D4FB6ABE1F00FF534BD377979309B225EA0CB 86245~|~1~|~6~|~06/ENH/NEWA~|~"06/ENH/OT/NEWA" - Transportation Alternative Funds for Pedestian Additions 4B37 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $785,000.00 4B37 - Construction/installation of sidewalks, signals, ADA ramps, lighting and various traffic calming items.~|~28 - Facilities for Pedestrians & Bicycles~|~0FB43016B015F501DF5C308B0BB995AD177404CE 86245~|~2~|~8~|~08/NHS/NEWA~|~"08/NHS/PV/NEWA" - District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving in the City of Newark on Lic-SR 13-10.29 to 11.89;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6ADAA3B55897C4F6F2A0C0391A35A16574015128 86245~|~1~|~3~|~03/CMQ/NEWA~|~"03/CMQ/BR/NEWA" - LCATS/City of Newark Funding 4TB7 (80% Federal) / 4PH7 (20% Local SIB Loan) - CAP $2,500,000.00 4TB7 for Construction Phase? Bridge replacement of SFN 4500660 SR 13D Bridge over SR 16: BR Replacement Eligible: Length = 172; SD/FO = 1; DSR = 6; SR = 50.0~|~10 - Bridge Replacement~|~95960C1908C9165D43B6F47443D89C474A8BBA07 110402~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~EBBEADD5A367635DE8EB27F5E297A3B570BD13E9 98784~|~1~|~1~|~01/SAF~|~Widening of Princeton Road to provide 11 foot lanes and 5 foot paveed shoulders between Jayfield Drive and SR-747. Also installation of edge line rumble strips.~|~21 - Safety~|~DEDE3B077F8AD055FC69A3E1746FD5AA3332FFCC 114471~|~1~|~1~|~01/NFA~|~Resurfacing SR 646~|~05 - 4R Maintenance - Resurfacing~|~B92CAC62E8495F4674A706F661A79A30E8B73D04 96511~|~1~|~1~|~01/NFP~|~GES contract for paint inspection.~|~~|~70044D2CDE35DC33F25599A21212762876739282 110867~|~1~|~1~|~01/SAF~|~Plan split for all roundabout construction~|~04 - Reconstruction - No Added Capacity~|~D076465C49FE055AB5512C05E242561D115CBD19 89427~|~1~|~1~|~01/NHS~|~Pruning, Tree/Bush Removal~|~44 - Other~|~C36E2DEC7291D05DCB5EEAAEF6767E595B370D16 92841~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~38AFE0B194F648494E2D22A884CBB64698D214DC 92841~|~2~|~2~|~02/STR~|~Plan Split for roadway work~|~04 - Reconstruction - No Added Capacity~|~AF5F44D6FFC28A9B7C3AEA7BB3DC3416C410B776 100894~|~1~|~1~|~01/STR~|~ROS-327-2.46 Bridge replacement~|~10 - Bridge Replacement~|~7CAB12D309232664223C289B3FE94ED299D58EC4 112568~|~1~|~3~|~03/MPO~|~Plan split for Urban portion of federally eligible expenses in construction and CE from SAC 4TA7 (NOACA)~|~05 - 4R Maintenance - Resurfacing~|~55C6661EA97CC4EC5B643A34B3845BA31AC37E78 112568~|~1~|~1~|~01/MPO~|~Plan split federally eligible expenses of the rural portion of project using Urban Paving funds.~|~05 - 4R Maintenance - Resurfacing~|~94FD551A905D967EA1C44E77276DE43017D24F6B 112568~|~1~|~2~|~02/MPO~|~Plan split for federally eligible expenses of the urban portion of project eligible to be paid using Urban Paving funds.~|~05 - 4R Maintenance - Resurfacing~|~B56196F99F6A591F503294C34DDD1CCB3FEC5942 104683~|~1~|~1~|~01/NFP~|~JAC CR VAR Guardrail FY22.~|~21 - Safety~|~1FC8E2A5C3FD29B9794BFD8EA66F0B5505F2F35A 125801~|~1~|~1~|~01/IMS~|~District Preservation - 4PF7 (Federal 80%)/ 4PS7 (State 20%) - No CAP -Replacement of Tower Lighting at Guernsey IR 77/US 22 Interchange.~|~21 - Safety~|~5A14BF461B2AFCA2F2FB9B3F7064F2EA763952D3 121612~|~1~|~1~|~01/MPO~|~Plan Split for Carbon Reduction Program funded scope.~|~28 - Facilities for Pedestrians & Bicycles~|~07A2B30FDDBDF08C75A94564CBC7C13A36223D7E 123223~|~1~|~1~|~01/STR~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~B76CF609325B61D3FB76CAED88B84CEF0C35FD8B 124320~|~1~|~1~|~01/CMQ~|~unfunded bike/ped path project~|~28 - Facilities for Pedestrians & Bicycles~|~37461A0A65EBCFC4893AB48889215C10BD051874 114324~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4A471B9B8A2E83A93F19BCD5EBBB02BBDCF737ED 119053~|~1~|~1~|~01/STR~|~All work included in this split.~|~47 - Bridge Preventive Maintenance~|~5E0D896BFB03D7F19B37C8A963B10E94B3BFD0DA 121314~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~12D426EB81F339144FB6CB783181AFDD32613B49 121314~|~1~|~2~|~02/SAF~|~added plan split for safety funds.~|~21 - Safety~|~0C0062C06CD131F3C6B48D8AEA8F81F984F8A0C2 114795~|~1~|~1~|~01/NFA~|~Routes being chip sealed by Operations~|~05 - 4R Maintenance - Resurfacing~|~3B7A66E3AFB694510B71453A281EA796BF26BAA3 86994~|~1~|~1~|~01/BRO~|~Replace existing multi-span presstressed concrete box beam bridge (COL-154-1404, SFN 1503723) with a new three-span prestressed concrete I-beam bridge, as identified through the PE Study.~|~10 - Bridge Replacement~|~B19368891B29FD2381FC69F44358701033348FC9 107886~|~1~|~1~|~01/MPO~|~Resurfacing of N River Rd in Munroe Falls.~|~05 - 4R Maintenance - Resurfacing~|~1AD0F4B9BB284288F2456705A679F2F5052A306A 119333~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~410B7A32C94E7D78C0180A63576EF310A1F32CD9 97273~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~04 - Reconstruction - No Added Capacity~|~6BDAEC914ABD32DD2C8B6BB4842D4E5E8C957517 100359~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~44F423C8062403BCBDB02DBDBD8A694F6AE0BB2C 105458~|~1~|~1~|~01/S>2~|~Pavement AC Overlay w/o Rpr MED SR 94 05.334 TO 5.383Smoothseal MED SR 162 15.288 TO 16.635~|~05 - 4R Maintenance - Resurfacing~|~72E855080B7AD5D667B0D0083E6D56E47B265AD0 105458~|~1~|~3~|~03/STR~|~Bridge Work:MED SR 162 13.670 SFN 5206073EXPANSION JOINT REPAIR/REPLACEMENT (48)~|~13 - Bridge Rehabilitation~|~28C045C526B79EB1DECDE1739D66BDBF02B2CC49 105458~|~1~|~2~|~02/STR~|~Pavement AC Overlay w/o Rpr MED SR 94 5.383 TO 7.64, MED SR 94 7.91 to 10.345, MED SR 94D 0.000 TO 0.093Smoothseal MED SR 162 12.917 TO 15.288~|~05 - 4R Maintenance - Resurfacing~|~E479709DA5855670459E78AA8D1D319082EAA946 101906~|~1~|~1~|~01/NFA~|~Trumbull County Engineer.~|~05 - 4R Maintenance - Resurfacing~|~307A5F286062F44A120140D0F69789E944740D3F 102571~|~1~|~1~|~01/STR~|~All work in the project is in this plan split. US 127 in Van Wert County from US 224 to the Paulding County line (12.22 to 18.39) and US 127 in Paulding County from the Van Wert County lime to the south corporation limits of the Village of Paulding (0.00 to 9.69).~|~05 - 4R Maintenance - Resurfacing~|~A66233619DAF8AA422C0285DB80CA9A334C806E9 119261~|~1~|~1~|~01/S5K~|~All items of work associated with resurfacing SR 665 that is located within the London Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~C65CAD3B1D49217AFB74C50786D828F842C1E361 119261~|~1~|~2~|~02/STR~|~All items of work associated with resurfacing the routes located within the STP Rural Area.~|~05 - 4R Maintenance - Resurfacing~|~DBD221E9EF649AAA12487205E98A07A77AAB7020 122049~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~0C5FC3B800F6ED6F5E02124D3FE5E76934F5FA58 113850~|~1~|~1~|~01/SAF~|~"01/SAF/OT/MTVN" - 90% Federal (4HJ7) and 10% Local (4BG7) - see project CAP comments. Improvement of intersection at South Main Street and Columbus Road.~|~21 - Safety~|~3B99D0B637B8427FD795019C5B01155D7B0ACAE5 86694~|~1~|~1~|~01/STR~|~District Allocation~|~47 - Bridge Preventive Maintenance~|~67ABF6E24B63B5AC2C66934F166AD972CA9DC967 107603~|~1~|~1~|~01/MPO~|~Resurfacing of Ravenna Road from Idlewood Dr to Richner Ct in the City of Twinsburg.~|~05 - 4R Maintenance - Resurfacing~|~F2DEAE231D644891C2F87B050CF7922EA4607715 99210~|~1~|~1~|~01/STR~|~This split is for all resurfacing work on CR 304. This split uses 80% Fed. (4B77) - 20% Local (LNTP).~|~05 - 4R Maintenance - Resurfacing~|~64657210D1800C5441586393E1FBAB16F483BAFF 99210~|~1~|~2~|~02/NFA~|~This split is for all resurfacing work on CR 330. This split uses 80% federal SAC 4B77 and 20% local funds SAC LNTP. CR 330 is a rural minor collector.~|~05 - 4R Maintenance - Resurfacing~|~D0A6353387E4E00FCA98F5D2B8A3B49DA373B704 88342~|~1~|~1~|~01/BRF~|~Bridge replacement and realignment~|~10 - Bridge Replacement~|~3C2BEB4373C0C7DF0CEDA87763FD781DABB9FF22 117544~|~1~|~1~|~01/SAF~|~Guardrail replacements in D05~|~21 - Safety~|~F3B485439DC3683FEF1E253158506E7892064002 97658~|~1~|~1~|~01/NFA~|~Resurfacing TUS-751 from the COS Co. Line to SLM 4.02 including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~03B631289C9617293B40CDA66D82967C187A71B5 97658~|~1~|~2~|~02/STR~|~Resurfacing TUS-751 from SLM 4.02 to SLM 4.38 (Stonecreek).~|~05 - 4R Maintenance - Resurfacing~|~8828419ED9B8D67B0495EC75682A996062506F0F 122329~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~500973F24652E5DA788D532E20FCD50729FC35AE 90470~|~1~|~1~|~01/MPO~|~Mill & Fill~|~05 - 4R Maintenance - Resurfacing~|~19C3608E5A8356E2DF99B2A51544910BBE91ACCD 93560~|~1~|~1~|~01/NFA~|~Task order PID for the consultant to provide construction inspection services throughout the district. (Paint)~|~17 - Construction Engineering~|~1904B695546BA6731292438B690696D6325DEBDD 115349~|~1~|~1~|~01/NFA~|~Construct sidewalks and corresponding ADA facilities.~|~28 - Facilities for Pedestrians & Bicycles~|~DF13318E57F46797011272F98A1CF8D9A96AFEF9 94665~|~1~|~1~|~01/SAF~|~Project involves installing new Raised Pavement Markers on various county routes in Butler County~|~21 - Safety~|~086ED90104E2DCEE1B1954B4D4170B4AED3C75D7 87332~|~1~|~1~|~01/NHS~|~7101694 ROS US35 13.53 Intersect: W Fork Of Biers RunBrdg Repair 80 Fed/20 State. 01/NHS/BR/State~|~13 - Bridge Rehabilitation~|~21A62E57982F8C73CEBF2A57DFFA04B2AD518803 109760~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~E22E73C37E4AC2BCD4DCC2162BD8210D66827AD2 105109~|~1~|~1~|~01/STR~|~SCI 335 12.02 (SFN 7305133)~|~04 - Reconstruction - No Added Capacity~|~EC227A9DD81C30A14311C05E3E567C9C105AB810 87136~|~1~|~2~|~02/NHS/FOST~|~Work on the NHS in the City of Fostoria. The 80% federal funds will be from the District Preservation Program fund SAC 4PF7. The 20% match will be provided by the City of Fostoria. 26.79 to 27.93. From the Corporation Limits of the City of Fostoria to the Seneca County Line.~|~05 - 4R Maintenance - Resurfacing~|~3EE325C947FB25D8C2AC9B41313259B762A41BC8 87136~|~1~|~1~|~01/NHS~|~Work on the NHS. All funds are from the District Preservation Program 80% SAC 4PF7 and 20% SAC 4PS7. Work outside of the City of Fostoria.~|~05 - 4R Maintenance - Resurfacing~|~87D9E46B7D49F4020A8818EB66530697DE638936 87136~|~1~|~3~|~03/NFP/FOST~|~Items paid 100% by the City of Fostoria.~|~05 - 4R Maintenance - Resurfacing~|~460822CA2FBCD5FAD205E3A2821700D29F008993 88767~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~B75E8A2C69F7DBF75999F8185B74B6AF34F65EA0 123843~|~1~|~1~|~01/STR~|~geotech plan split.~|~04 - Reconstruction - No Added Capacity~|~E3E591E087FE8C9DCD2E31C3719BDBCF249C36CF 106803~|~1~|~1~|~01/NHS~|~Beam Repair~|~13 - Bridge Rehabilitation~|~896219573FB0740081F8F7F7AB6E3121160D69D5 98344~|~1~|~1~|~01/NHS~|~ District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP -District wide guardrail upgrade/replacement on NHS Routes 1) Gue-22-(5.59-6.04), 2) Gue-22-(9.28-11.12), 3) Gue-723-(0.48-0.85), 4) Cos-36-(16.40-19.06).~|~44 - Other~|~9176639EEB25FA09C704699C9465BE568219FBDF 98344~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP -District wide guardrail upgrade/replacement on OFAH-Urban Routes Cos-541-(17.79-18.56)~|~21 - Safety~|~764D49C4779DE97ABC595FC9243D917B9D04F3EC 98344~|~1~|~3~|~03/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP -District wide Guardrail upgrade/replacement on IMS Routes: Gue-723-(0.07-0.48) and Gue-723 to Gue IR 70 WB on ramp, and Gue IR 70 WB off ramp to SR 723.~|~21 - Safety~|~D0835472C08DCCFAF75D01CD7071DB0E63C5BC45 98344~|~1~|~4~|~04/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP -District wide project to upgrade/replace guardrail on OFAH-Rural Routes: Cos-541-(0.00-8.59), Cos-541-(8.73-17.79), Fai-664-(1.80-10.84), Gue-513-(6.92-7.02), Kno-229-(0.55-6.55), Lic-586-(1.66-9.90), Per-13-(13.50-17.50), Per-37-(15.02-20.69), Per-216-(0.04-1.00), Per-669-(9.50-9.72), and Per-595-(0.00-2.10)~|~21 - Safety~|~36BA0702015B88A8D0C2C3594186088C573504A5 115417~|~1~|~1~|~01/IMS~|~This plan split addresses all bridge work needed for the project, which could include new bridges or treating the IR-275 bridges over the Little Miami River and over Loveland Madeira.~|~13 - Bridge Rehabilitation~|~0160D20AC98B58F365910A5D6CCCF65377B50C2F 115417~|~1~|~2~|~02/IMS~|~This plan split includes all roadway work for the project, including shoulder widening, resurfacing, ITS items, and other required non-bridge work.~|~04 - Reconstruction - No Added Capacity~|~8E182BA543FE9CAB1B6E90B8D492CCA73E1B48CD 115417~|~2~|~4~|~04/IMS~|~plan split for steel repairs on the HAM-275-3484 bridges~|~13 - Bridge Rehabilitation~|~A31F79D1C07C8D02F25B78583FC95FE748285B00 115417~|~1~|~3~|~03/IMS~|~Plan split for the GCWW waterline relocation~|~43 - Utilities~|~E716400B36DC00C1C65878E0503C4DEC1EAAFFA6 109886~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2025. Various routes and sections. Funded 100% State.~|~21 - Safety~|~3891D18F22B32388B7A31D1AAD53CEC976429275 102545~|~1~|~1~|~01/S>2~|~This plan split is for the resurfacing of the large urban sections.~|~05 - 4R Maintenance - Resurfacing~|~385B8EB377E315C69EF06C2003D271D0255828AF 102545~|~1~|~2~|~02/STR~|~This plan split is for the resurfacing of the rural sections.~|~05 - 4R Maintenance - Resurfacing~|~E84C73C840B3C57F8B6D205F52726E6AD3124D74 98198~|~1~|~1~|~01/NFP~|~District Preservation - 4PS7 (100% State) - Replacement of Raised Pavement Markers on various routes throughout D-05~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CDA9001411C9A64C92009B241D85E029E9C9C6FF 118684~|~1~|~1~|~01/S5K~|~Resurface rural population~|~05 - 4R Maintenance - Resurfacing~|~116D69ECC3010FEAEF67094F8569A591B2DB1A57 118684~|~1~|~2~|~02/NFA~|~Resurfacing Not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~B213C76F30BD80FD424F8B45333E524738A28ED6 126327~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~3F4E5B16971D6D7D5E4281004DF2EB7A2072B9B7 119073~|~1~|~1~|~01/MPO/SYC~|~Installation of pre-emption at all signalized intersections in Sycamore Township.~|~21 - Safety~|~09461BC074AA6112C6B4BAD0DD1291A17F1E6AE9 119073~|~1~|~2~|~02/MPO~|~for use of cost difference between generic items and alternate bid~|~21 - Safety~|~71D4188255E3F6CBEFE8CC654731FA90980CF2E7 105279~|~1~|~1~|~01/NHS~|~Resurfacing COL-30~|~05 - 4R Maintenance - Resurfacing~|~1FE021D4714ECED680551C029717CB796E5B0730 105279~|~1~|~2~|~02/NHS~|~Bridge deck sealing with HMWM for SFN 1502131 & SFN 1502190~|~47 - Bridge Preventive Maintenance~|~98602BEBD5103AA41E514381C7897F3CA24B710A 118793~|~1~|~1~|~01/BRO~|~Bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~D86E6B5C7DDE4D07FEC0045429299D6FA9C8F2E5 118793~|~1~|~2~|~02/IMS~|~Work on state bridges over Heider Ditch that are under 20ft~|~04 - Reconstruction - No Added Capacity~|~4E2CA0C1CC5C961FF07A8A8ABB2AF0A5E2BE7DD2 100702~|~1~|~2~|~02/NHS~|~Remove/replace median u-turns and add acceleration/deceleration lanes along State Route 21 at Minor Road, Copley Township, Summit County, Ohio.~|~21 - Safety~|~664E69BF32663FD0FC78B0AA38BC59A1C1FB41E7 100702~|~1~|~1~|~01/IMS~|~Construction of 700 foot 57" barrier wall on IR 77 NB to SR 21 SB Ramp, includes resurfacing of ramp and shoulder in Copley Township, Summit County, Ohio.~|~21 - Safety~|~0CC0D0437D599BBE0292950BECE0F9DB9B19B218 88748~|~1~|~1~|~01/STR~|~Traffic signal maintenance 4CP7 does not require splits.~|~21 - Safety~|~C2DC98C412B8939E7DB8283A7C1E06976EA87BF7 111636~|~1~|~1~|~01/IMS~|~Concrete deck overlay project. NOB 77 16.67 L (SFN 6100848) and R (SFN 6100872), 17.70 L (SFN 6100961) and R (SFN 6100996), 16.80 L (SFN 6100902) and R (SFN 6100937). Interstate route funded 90 Federal/10 State.~|~13 - Bridge Rehabilitation~|~9E5B77AD71A78B4E69E6A0E028581DD9D799B012 119360~|~1~|~1~|~01/BRO~|~Bridge.~|~10 - Bridge Replacement~|~68F7D506FEBE322D061506330812FA1022E78806 100437~|~1~|~1~|~01/NHS~|~Deck Sealing~|~13 - Bridge Rehabilitation~|~4008F4E84CFDBD0DDDF026CD72A60491C14D764B 103267~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~76A47F2CCDC55F237C912F6553F3FD9B5D8C54F4 101508~|~1~|~1~|~01/STR~|~DSR# BEL-021~|~04 - Reconstruction - No Added Capacity~|~D11997BBEEC8D58A26839196789D1EA555770063 97360~|~1~|~1~|~01/NFP~|~Mowing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~267B08C76815CD682930AD7ED94ADBF4747BE248 93919~|~1~|~1~|~01/ENH~|~Intersection bump outs for safer pedestrian crossing and traffic calming measures, Landscape enhancements, drainage improvements and theme based signage, & ADAAG crb ramps. East Main Street in Fairborn from Pleasant Avenue to Dayton Drive.~|~31 - Landscaping & Other Scenic Beautification~|~03179EC36DFF2D9E82940EA4982E31B127289B61 93919~|~1~|~2~|~02/ENH~|~Plan Split covers the improvements that are not eligible for federal TA funding (roadway resurfacing, replacement of existing curb and sidewalk that is not in deteriorating condition, etc.).~|~04 - Reconstruction - No Added Capacity~|~D4D0F9F905029A50B68562FD9BBC4A6C1FF83E71 108938~|~1~|~1~|~01/NFP~|~All work is in this plan split.~|~13 - Bridge Rehabilitation~|~DF53736F3E001AF2597E4EE429AAE8541D3F1C2E 86154~|~1~|~2~|~02/S>2/BHts~|~Miscellaneous roadway work, Boston Heights, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~24FEB97C015AD9B4FA0FCA71A445E941C749B152 86154~|~1~|~1~|~01/BRO~|~SFN 7768141 Akron Cleveland Rd over Metro Park Bike Path~|~10 - Bridge Replacement~|~AC39411CFBD8493B1F91C0A10489C9C094C7D6B8 93743~|~1~|~1~|~01/SAE~|~Install sidewalk (where none exist) and ADA compliant curb ramps, sand replacing deteriorated curbing and driveway approaches 300' West of Ravenwood venue to Catalpa Drive.~|~21 - Safety~|~0DE46907EDC819812941154DD387D4643E73D3D2 88609~|~1~|~1~|~01/STR~|~Replace structure SFN 5901863 - MRW 95-0.24 over Otter Creek and associated roadway work on SR 95 and the south leg of TR 60~|~10 - Bridge Replacement~|~E45C48B1A44A1D3330BD9D261B51026E966E371E 88609~|~1~|~2~|~02/NFA~|~Replace structure 5931525 MRW-TR60-2.00 over Otter Creek~|~10 - Bridge Replacement~|~8287C2848F3ACDDFDEEC60AD155D9ABC8956205F 88746~|~1~|~1~|~01/SAF~|~4CP7 funds don't require the location being entered. Highway lighting maintenance districtwide.~|~21 - Safety~|~440A0B10A57D438B6DA92F92796329F6311D5119 115613~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~717AA682A11BCF5318BBDE51CCE670C4652250AB 104047~|~1~|~1~|~01/SAF~|~Guardrail upgrade/replacement on various routes with 100% federal 4HB7 funding.~|~21 - Safety~|~4FB06E555711EF4A6A4416EDB01CA292B8B838C1 76014~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Facilities - 4MA7-005 (100% State) - Facilities funding for construction of the new Dresden Outpost~|~01 - New Construction~|~B43A3C183A8955F7A00E5C59B8CFC39136B980F0 117950~|~1~|~1~|~01/NFP~|~Lighting repairs and upgrades at various locations throughout District 4.~|~21 - Safety~|~9099BD422E34039CC2B424C3BDDDAD60E23275E0 98337~|~1~|~3~|~03/NHS~|~"03/NHS/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full depth pavement Repairs on the NHS: 1) Lic-40-4.69 to 5.27~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~23E9EF4D007065627594C41EC82A90231E748A16 98337~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full depth pavement Repairs on the OFAH-Rural: 1) Cos-651-00.00 to 3.04, 2) Gue-313-9.91 to 21.02, 3) Lic-40-6.14 to 14.37, 4) Lic-40-16.66 to 28.60, and 5) Fai-159-0.00 to 6.74~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~63379A13CCCF96DE757C2F2247162D81DC1C75E9 98337~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full depth pavement Repairs on the OFAH-Urban: 1) Lic-40-5.27 to 6.14, and 2) Lic-40-14.37 to 16.66~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9284F72161E0ACA04CA0B6AAB2D78EEE8AE97EEA 98337~|~1~|~4~|~04/NFA~|~"04/NFA/PV/ " - District Preservation (100% State) 4PS7 for Spot Pavement Repairs on 1) Gue-313-2.24 to 9.91 and 2) Cos-643-00.00 to 10.65~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2F462AD9C5C297582B8C3328E60E2A0DB50A5610 98760~|~1~|~1~|~01/ENH~|~Installation of a minimum 6' wide sidewalk on both sides of SR-125 (Beechmont Avenue) between Forest Road and Wolfangel Road, new bus pull-offs near the Beechmont Avenue and Wolfangel Road intersection, and related drainage, curb, lighting, singal, and landscaping improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~E1CEAA894162D3BC07AC381C4D3AF9A95044859A 98760~|~2~|~2~|~02/SAE~|~Five Mile Road to the County Line in Hamilton County and county line to Independence/Hopper Hill in Clermont County. Access management and minor traffic control improvements.~|~21 - Safety~|~93537A7765E31AF13D87B21D572D3E4602699204 114237~|~1~|~1~|~01/IMS~|~Bridge sealing~|~~|~0ABFA64CB958EA9E97C669E83921E425CC4A9A4D 93551~|~1~|~2~|~02/SAE~|~SRTS Project~|~28 - Facilities for Pedestrians & Bicycles~|~7132CB34AD34F5551785F2D278960216085A2A7C 93551~|~1~|~1~|~01/SAE~|~SRTS Project~|~17 - Construction Engineering~|~E6956D5DFE10FBA01F5E120A83DA8C8C25778C8A 100649~|~1~|~1~|~01/STR~|~Plan Split for the rural portions of US 40 within the project. This is between SLM 9.93-17.68~|~99 - State Preventative Maintenance~|~08A5724903FCBE55CEA72DB3DC73A49B3C916E5E 91449~|~1~|~2~|~02/S>2~|~General system paving FRA-315: 12.79-13.49, 13.56-13.80~|~05 - 4R Maintenance - Resurfacing~|~1B0836207D1814098637C5AB154751FD81C99AE9 91449~|~1~|~1~|~01/S>2~|~Columbus urban pavingFRA-3D: 0.00-0.34FRA-315: 13.49-13.56~|~05 - 4R Maintenance - Resurfacing~|~D471491AEBA8DFF0A9864B28CC9F468D4889550E 113055~|~1~|~2~|~02/SAF~|~Installing new wrong way signage and markings on US 30 in Allen County aimed at safety improvements. Will be safety funded with 100% SAC 4HJ7.~|~21 - Safety~|~FB8FDC14694D5FF6EAE1356558DEC0E71BF436AD 113055~|~1~|~1~|~01/NFP~|~All general pavement marking updates in this split- non safety items. Funding is 100% state funding using SAC 4PS7.~|~21 - Safety~|~DE1F973CB84DDFB719818871886D4212011B34BE 111170~|~1~|~1~|~01/NFP~|~ODNR Division of Wildlife project to include microsurfacing access road and parking area repairs at the Racine Ohio River Access in Meigs County. Funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~0BDFA490B77CE0DCFB02354ADA20DF17BBA7BFB2 96608~|~1~|~1~|~01/NHS~|~The project is going to rehabilitate the bridge TUS-250-2033 (SFN 7905378) by replacing the existing steel beam superstructure with a new steel beam superstructure. The bridge will be raised to meet the Vertical Clearance requirement of 16'-06" and the abutments will be converted to semi-integral.~|~13 - Bridge Rehabilitation~|~FA79409E890069612C7587BD940971F829757C8C 125665~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~A5539C24F8DC3F459F49CB26097BDA38BC5C3F30 90412~|~1~|~1~|~01/BRF~|~Project involves the replacement of the structurally deficient Bridge No. PRE-CR18-0155 (SFN: 6836267), which carries California School Road (CR-18) over Four Mile Creek and the replacement of structurally deficient Bridge No. PRE-TR 15-0135 (SFN: 6839401) which carries Monebrake Road (TR-150) over Seven Mile Creek. Work includes minor approach work, pavement repairs, and vertical alignment adjustments, as necessary.~|~10 - Bridge Replacement~|~6B79576B4B7633B91FCB15B8C48179B7069EFB2B 93601~|~1~|~1~|~01/SAE~|~Federal Safety funding for the intersection improvement which primarily will add left-turn slot to US-20 to McMackin Road.~|~21 - Safety~|~B9E405F37C8F6C084F509ACEE801710D6C6E053B 106833~|~1~|~1~|~01/BRF~|~Replacement of the existing bridge deck with minor widening required to meet minimum design standards. Rehabilitation of the existing abutments and placement of rock channel protection along the stream banks to protect the sub-structure from future erosion.~|~~|~CBB359E1F86EF33CCCD6F1841A89D8FB6952A7BC 116239~|~1~|~1~|~01/NHS~|~Double micro in ROS.~|~05 - 4R Maintenance - Resurfacing~|~022A67B7160ED596C564E1710F51E4E5939AB197 123481~|~1~|~1~|~01/ENH~|~ADA compliant pedestrian improvements utilizing Federal TAP and Safety funding up to the CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~AFEC4FF91BB07C2B764684C05D2A7A3AEC57F830 110269~|~1~|~1~|~01/NFP~|~1 1/" asphalt overlay, pavement repair and other roadway items to the reservable and main drive and lots (off of Browns School Road) and south park main drive and lots (off of USR 40).~|~28 - Facilities for Pedestrians & Bicycles~|~5438BA970C807056104F7CD2A03855B65246A101 101221~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8269DB06D4B5148C68A0428261600C7627C649BE 101221~|~1~|~2~|~02/S>2~|~Resurfacing SR199 from slm 27.96-28.80~|~05 - 4R Maintenance - Resurfacing~|~993BE2B82DC4D3FFDC7DCB2B6EC324903D83A6FC 95546~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations include: MRG-78-15.90, MRG-60-20.45, MRG-60-20.74, MRG-60-20.80, NOB-285-1.83, NOB-821-1.69, and NOB-821-18.42. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~20E0D5C9429C112D80FF5A00E558441E88F88396 95546~|~1~|~2~|~02/S<2~|~Culvert replacement project. NOB-821-11.50. Urban other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C5856D3D5CE0983AAC23B1BF8407073AC65241E8 118361~|~1~|~1~|~01/NFA/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~97F75FD362AE0CE8DECB1212870D57570B229655 101861~|~1~|~1~|~01/NFA~|~The City will be constructing a new road off U.S. 42 that will be connecting the main entrance of the new facility being build for Engineered Materials System, Inc. (EMS)~|~01 - New Construction~|~2FF2B298E21DA63F8B884308A1D5A96345719873 101971~|~1~|~1~|~01/NFP~|~Split for state funds to add VPF to the structure.~|~47 - Bridge Preventive Maintenance~|~0ADD7C1C4B81B632C342F115F7900B875AA5986D 84572~|~1~|~2~|~02/NHS~|~Deck overlays to SFN 7606206 STA SR 241 14.67 over Noble Pond and SFN 7606273 STA SR 241 17.14 over Nimishillen Creek. Culvert invert repair to SFN 7606249 STA SR 241 14.82.~|~47 - Bridge Preventive Maintenance~|~946CABD86A01FD6BEE7F0C9547CB0A45AC36350D 84572~|~1~|~1~|~01/S<2~|~Resurfacing of STA SR 241 from 11.29 to 17.90.~|~05 - 4R Maintenance - Resurfacing~|~97241A50081D871370DCC549516252A4EE8C65F7 84588~|~1~|~1~|~01/NHS~|~Culvert Construction/Repair~|~~|~A9213EC758A46F002E5EAFD0636E6E39807BE4EE 119380~|~1~|~1~|~01/IMS~|~Split for bridge work in the interstate system. ~|~13 - Bridge Rehabilitation~|~19E18C31531767016D7CA0F888FD3FD7AE9B5C4B 98267~|~1~|~1~|~01/MPO~|~Installation of sidewalks which would fill in the missing gaps identified in the Mad River Middle School Travel Plan on the South side of Valley Pike from Hypathia Avenue to Spicewood Drive.~|~21 - Safety~|~7743FA7784AA4F54DC2666935289FF6D497F4F34 123265~|~1~|~1~|~01/SAF~|~Lighting reactive maintenance. ~|~21 - Safety~|~FB5C7958E2638C2DBC9AF90B7965A878D412D1E1 96111~|~1~|~1~|~01/NFP~|~Project to construct new Columbiana County Garage~|~01 - New Construction~|~926E6FC590339798A8A6CA30F895BBF8CCE42F63 105547~|~1~|~1~|~01/STR~|~Rural plan split MAD-42-0.00-3.96 & 9.86-12.35~|~05 - 4R Maintenance - Resurfacing~|~C7E74729B5D9DAF8AD70B8EB74822371ED44CA44 105547~|~1~|~3~|~03/NHS~|~NHS plan split MAD-42-13.43 - 25.15~|~05 - 4R Maintenance - Resurfacing~|~C6CECC75851DE357D989DD3EB08224B0AF2EB905 105547~|~1~|~2~|~02/S<2~|~London urban area plan split MAD-42-3.96-5.92 & 9.16-9.86~|~05 - 4R Maintenance - Resurfacing~|~C2739009441578EABB6BBAF623B3BE7E7505C857 105547~|~1~|~4~|~04/NHS/MAD~|~Repair work to be funded by Madison County~|~05 - 4R Maintenance - Resurfacing~|~230AD13E4E5C1FF29729E3B7A4CDEFD8DCC05788 111040~|~1~|~1~|~01/STR~|~Culvert ReplacementJAC-279-8.76~|~04 - Reconstruction - No Added Capacity~|~8B3CE73E9EC9CD186F1A0E4D35DC7BBF0B2E1B56 89156~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge Project~|~13 - Bridge Rehabilitation~|~C1A6D3D9164EE8AE2BB4B8E9EF881AA78E12E76B 96449~|~1~|~1~|~01/STR~|~Two-lane reurfacing project using an asphalt overlay treatment. WAS 339 8.57-13.64. Federal Aid rural route funded 80% Federal/20% State.~|~17 - Construction Engineering~|~797A6D2BD8FAE5F3ED5ED2D93A229B1E3570807A 116093~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various Routes in ATB, MAH and TRU Counties.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D714386A8E6E573B6B1287337B1398F2BF1C9865 91993~|~1~|~1~|~01/STR~|~JAC SR93 0.00-3.63JAC SR279 12.48-19.44~|~05 - 4R Maintenance - Resurfacing~|~90CF16A885B18A50C788B28274379811EDC47A4C 112823~|~1~|~1~|~01/NHS~|~MAR-23 from 7.78 to 9.74~|~05 - 4R Maintenance - Resurfacing~|~A46A0744F4B5C5F047F10172BC65977CB62FFD2D 112823~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~D003EAA68D1B8F258092A8EBABAE4EE49363BDE5 111610~|~1~|~1~|~01/NFP~|~Construct new road to service the new Hendrickson USA facility.~|~01 - New Construction~|~715DAA899244B8F3B8DBB34DC45AAE446DD38E24 93142~|~1~|~1~|~01/NFA~|~Resurfacing with related work on Mus-SR 284-00.00 to 13.36~|~05 - 4R Maintenance - Resurfacing~|~8D4642F15C952F9F17124AA4F5CD20FC0F419A1C 98242~|~1~|~2~|~02/STR~|~STP Rural Micro: ASD-60-11.74-15.74/ASD-511-6.92-10.96/RIC-430-10.07-10.11~|~05 - 4R Maintenance - Resurfacing~|~763EA3708D94A76FF9901C3A56F64AC35ED5A4E5 98242~|~1~|~1~|~01/S<2~|~S<2 Micro: ASD-60-15.74-16.22/ASD-511-10.96-11.35/ASD-511C-0.00-0.04/RIC-430-7.00-10.07~|~05 - 4R Maintenance - Resurfacing~|~01ABBD8E77F3F3DC2F8E909FCA4B4DEB76A76A8A 126609~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~24A099C469B515071730DC898AB906A0ED0F08BA 91902~|~1~|~1~|~01/NHS~|~Resurfacing form SLM 0.00-4.30 and miscellaneous bridgework~|~~|~6F4493FD2546544E3930369C7ED98FF116477892 80108~|~1~|~2~|~02/NHS~|~Federal/Local urban paving in Columbuson NHS route, FRA-23: 0.51-1.50, 2.21-4.58, 5.41-5.6302/NHS/PV/F_LC~|~05 - 4R Maintenance - Resurfacing~|~610145090C8B2AFEC26D88302A201E2988915E7C 80108~|~1~|~1~|~01/NHS~|~Federal/State NHS resurfacing on FRA-23: 0.00-0.51, 1.50-1.94, 4.58-5.41 Unincorporated areas01/NHS/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~6BBF53077873F7B2723A0F501DAE469490A57814 80108~|~1~|~4~|~04/NHS/COL~|~100% Columbus items for pvmt repair~|~05 - 4R Maintenance - Resurfacing~|~8C78B31768EACF1D7265DDCC41DBACBC6A992DD4 80108~|~1~|~3~|~03/NHS~|~Federal NHS/State funding for minor bridge work on 2 structures:2500485 FRA US23 0.25 Intersect: Big Walnut Cr2500515 FRA US23 0.25 Intersect: Big Walnut Cr~|~13 - Bridge Rehabilitation~|~8F64ABCFBF58D0951F31EF0788B265E95540A554 122474~|~1~|~1~|~01/STR~|~All work included in this split.~|~66 - Resilience Improvement - Highway Project ~|~CF13BDE3C1396B24D8A7945B84573D3FD034559D 115760~|~1~|~1~|~01/S5K~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on PRE-122 ~|~05 - 4R Maintenance - Resurfacing~|~B5124A288A77616CF1C1C698DDD57B9AA15BB02C 115760~|~1~|~2~|~02/S5K/EATN~|~Plan split for the 100% City items on the urban paving on PRE-122 ~|~05 - 4R Maintenance - Resurfacing~|~2B9F8F0B26B515605447E0DE1E460A072EE8A31C 101326~|~1~|~1~|~01/IMS~|~FRA IR 270 29.39 to 31.70~|~05 - 4R Maintenance - Resurfacing~|~DA9D3EAE0B727928BCD272754047A9AD2C228F5F 101326~|~1~|~2~|~02/NHS~|~FRA-33-4.86 to 8.78; MAD-42-4.80 to 5.93; PIC-22-18.88 to 23.96~|~05 - 4R Maintenance - Resurfacing~|~9CDFFCB3EC6EDDE08A13D8FDD673B32DDCF1F4D3 101326~|~1~|~3~|~03/STR~|~MAD-42-0.00 to 3.96 and PIC-22-21.04 to 23.96~|~05 - 4R Maintenance - Resurfacing~|~0DBFA5EF27A299008832E85CB9458F6B9FC162F1 101326~|~1~|~4~|~04/S<2~|~MAD-42 3.96 to 4.80 and PIC-22-20.65 to 21.04~|~05 - 4R Maintenance - Resurfacing~|~EF3ACAED2275D2E99B69E22E5CE1D43AEEAB78F8 125401~|~1~|~1~|~01/NFA~|~Bridge deck replacement project. WAS TR 200 0.86, SFN 8436045.~|~13 - Bridge Rehabilitation~|~292DA2F7603A5D6B27AB9FFB4AD227F8DCB45132 97681~|~1~|~1~|~01/STR~|~Partial and full depth repair and mill & fill at various locations on SR 161 and SR 347. Minor bridge repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C8D3DB0FB7C4A2FB24078136824703863E7CA8A 93758~|~1~|~1~|~01/SAF~|~ It is proposed to install traffic signals with lighting at the intersection of SR159 & TR236 (Delano Road). 80/20 split01/SAF/OT/State~|~21 - Safety~|~917DD6F36FCCD0736CDF404ED465064B63C82650 98687~|~1~|~2~|~02/S>2~|~Plan Split for all work associated with the new bridge over Duck Creek~|~01 - New Construction~|~8042B85C96A066B357502AC57A6D78EF09E3CF94 98687~|~1~|~1~|~01/S>2~|~Plan Split for all roadway work associated with the new Babson/Hetzel connection.~|~01 - New Construction~|~DAB54E90E700D678707A5410F81C40D1DD64CBD7 97731~|~1~|~1~|~01/NFA~|~J&C adding access road in the city of Columbus~|~44 - Other~|~24A353BFA4E583E30785AD3E77D31C768CA0CA18 88828~|~1~|~1~|~01/CMQ~|~Cooper Road: from Waxwing Drive to Plainfield Road Project involves adding curb, gutter, and an 8 foot sidewalk to the south side of Cooper Road in Blue Ash~|~28 - Facilities for Pedestrians & Bicycles~|~AC3129027F39F4DDB6075389F9E1016310505D77 94597~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt inlay treatment. WAS 7 49.40-54.03 and MOE 7 5.40-8.65. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~51788CF29D1D95CDBF35D90964E4721795F09F18 112563~|~1~|~1~|~01/NHS~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~68AE7171556022863CD50FB81074FD656D5C24A1 86935~|~1~|~2~|~02/S>2~|~Plan split for STA SR 619 4.66 to 6.69~|~~|~44974EBC93F7BDC000BCE8E3725A058A3BC9F312 86935~|~1~|~3~|~03/STR~|~Plan split for SFN 7606400 STA SR 619 7.69 over Swartz Ditch~|~~|~6A872674E22ACD96A8EDF52D447FA7BCE0169ED1 86935~|~1~|~1~|~01/STR~|~Plan split for STA SR 619 6.69 to 7.36~|~~|~89ACCEDE3566AC3ED377F4090EACD5EB03F01FF3 25732~|~1~|~1~|~01/NHS~|~Bridge Deck Replacement~|~10 - Bridge Replacement~|~03C090D1185216FFD2F43F8BBB90ACC232004301 100158~|~1~|~1~|~01/MPO~|~80% federal w/20% local matching funds for project eligible work items.~|~05 - 4R Maintenance - Resurfacing~|~DE59C9D9AC082251855125DB5BEB0E0F506D85A6 114743~|~1~|~1~|~01/STR~|~SCI chipseal~|~05 - 4R Maintenance - Resurfacing~|~E967B88CB16196C3416BF8A7CBCC1BB03EFE9682 126569~|~1~|~1~|~01/S5K~|~Urban Paving funded scope: resurfacing with necessary related items~|~05 - 4R Maintenance - Resurfacing~|~D0256B7B0DA9A29CF265A3499F71F85D9CF99D15 126569~|~1~|~2~|~02/NFA~|~100% locally funded scope not funded by Urban Paving: full depth repairs, curbs, ramps, walks, etc.~|~05 - 4R Maintenance - Resurfacing~|~7BF2D411DD927117AE6D56EBC5DC7D81CF65C1E0 126987~|~1~|~1~|~01/NHS~|~Pedestrian improvements~|~21 - Safety~|~DFF76D31D185D462718A61F30C8657C62B245CBC 111280~|~1~|~1~|~01/ENH~|~Construct 10' bike/ped trail; 95% Federal/5% Local (95% 4B37/5% LNTP).~|~28 - Facilities for Pedestrians & Bicycles~|~9610BEDD99BF7744683F486A1D1707B3BDB7DADA 113283~|~1~|~1~|~01/S>2~|~Culvert Replacement on MED SR 0057-09.78Culvert Replacement on MED SR 0094 18.84~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~82608D10D86A3BF1A8C40B2F9475EB52F4CF72A7 113030~|~1~|~1~|~01/S<2~|~This split is for SR 81 within the Lima Urbanized area. From the beginning of the project to the Lima Urbanized Boundary at Thayer Road at 22.24. District preservation program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~020A27FD3C20BDC25E798F294AF8636FC5B4A747 113030~|~1~|~2~|~02/STR~|~This split is for SR 81 in Allen County outside of the Lima Urbanized area. From the the Lima Urbanized Boundary at Thayer Road at 22.24 to the end of the project at the Hardin County line. District preservation program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~52D527BC2F26EB2924DC4CA25C54CC7C4645D869 80665~|~1~|~1~|~01/ERD~|~Plan Split for Paving SUM Lauby Road between Airport Entrance and Greensburg Rd.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2924CC6C22AA3D8AC240FA1E8924E499E7AC83AE 80665~|~1~|~2~|~02/SAF~|~Plan Split for Widening SUM Lauby Road Between airport Entrance and Greensburg Rd.~|~21 - Safety~|~3BCACE1723BCF5D373E8828B76D401F3DDB27B5C 95198~|~1~|~1~|~01/STR~|~Resurface portions of CR 5 SLM 0.00 to 5.93, CR 43 SLM 1.90 to 4.93 and CR 18 SLM 4.52 to 5.73.~|~05 - 4R Maintenance - Resurfacing~|~C1DFBFC2CBCAE1F3F7D01B8516D557BC3E407975 95198~|~1~|~2~|~02/S<2~|~Resurface portions of CR 11 SLM 8.72 to 10.43 and CR 18 SLM 5.73 to 5.90 and possible widen fo CR 11 from TR 45 to CR 43.~|~05 - 4R Maintenance - Resurfacing~|~335D125D7398D7EF2EE97B020D28F68DEA9CB2F9 119180~|~1~|~1~|~01/STR~|~Plan split for WOO-281-6.06 and WOO-281-9.06 Culverts~|~04 - Reconstruction - No Added Capacity~|~4C99BAABC88F7D0AA139B4BDFDF4DD3A4E90D309 84514~|~1~|~1~|~01/STR~|~Two-Lane reurfacing project using an asphalt overlay treatment. ATH 278 0.00-2.16, and HOC 278 6.15-10.77. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~ED6E0698B7BB51D8111DBF3304521EB2F0A18FBE 84514~|~1~|~2~|~02/S<2~|~Two-Lane reurfacing project using an asphalt overlay treatment. ATH 278 2.16-2.19 and HOC 278 5.38-6.15. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~9F52CC84909B02F89C350301EDE94909371C253F 84514~|~1~|~3~|~03/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 278 3.15-3.85. Urban other federal aid in they City of Nelsonville funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~B173B41CE789A6EA997B3A2D878EEECCED75FAE1 119332~|~1~|~1~|~01/NFA~|~Operations Chip Seal Routes to be performed in FY24~|~99 - State Preventative Maintenance~|~C61E866B7FC655655D17CF17E19C65F468A62D8F 102446~|~1~|~1~|~01/STR~|~ADA 348 1.53 (SFN 0104086) Bridge Repair.~|~04 - Reconstruction - No Added Capacity~|~8FDD2A0E88E24FACA2544F8C7FBF3D063374FD82 120005~|~1~|~1~|~01/NFA~|~Created for J&C Involvement ~|~44 - Other~|~AB5226B897180A2CAC322DB94E7FCB5B31417DD8 123776~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~~|~0946DDCC63D891112AAA8641FE209520BEA3C826 106091~|~1~|~1~|~01/NFA~|~The Port Authority will construct 1700 feet of new two lane road to extend Kister Court from the existing cul-de-sac to North Bend Road.~|~01 - New Construction~|~3BFF3C2D64DB671C40ABAF8468A9C64D61C8B558 99982~|~1~|~1~|~01/S>2~|~SR 54 from Urbana S. Cor/Powell St. (SLM 10.66) to USR 36 (SLM 11.22) - Pavement planing and resurfacing of SR 54 within the City of Urbana (1.75 inches).~|~05 - 4R Maintenance - Resurfacing~|~F8FECFFB12E8A2925DE01CA196640E64424D78E6 123960~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~292C96AB58B4BC8E306418848074EFBC3BAA6B5B 125170~|~1~|~1~|~01/SAF~|~District wide polyester pavement markings~|~21 - Safety~|~D92101C72FFEC95CDF7D5055E5E587B7FA5AF4E4 126382~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items.~|~05 - 4R Maintenance - Resurfacing~|~B4AB5E99B4689AD8D1E63CDF3E38AE60F33F4CE7 91095~|~1~|~2~|~02/NHS~|~Pavement Replacement for NHS section, WAY-83-10.81 to 11.03~|~04 - Reconstruction - No Added Capacity~|~7DF672F5EE227D75C5EB4215D69165F392BEB89C 91095~|~1~|~1~|~01/S<2~|~Central Office Rehab Funds and District Allocation Funds for STP<200000Roadway work for:WAY-3-14.56 to 17.70WAY-83-13.73 to 14.64WAY-585-0.00 to 0.33~|~04 - Reconstruction - No Added Capacity~|~472429734A70C59D917CC7CB9A2787A3E0C05FB7 91095~|~1~|~4~|~04/BRO~|~WAY-250-12.18 (L) SFN 8500606 Concrete Deck Patching~|~13 - Bridge Rehabilitation~|~9656C44A63B9F8945140DFDD74DB0F52089FA61E 91095~|~1~|~3~|~03/BRO~|~WAY-3-15.16 SFN 8500754 (Apple Creek) Concrete Deck Patching (S<200000)WAY-3-15.54 SFN 8500878 (Little Apple Creek, Ramp H-1) Concrete Deck Patching (S<200000)WAY-3-15.52 WR SFN 8500843 (Little Apple Creek, Ramp H-2) Full Depth Repair (S<200000)~|~13 - Bridge Rehabilitation~|~6C86131D964832800322B4C78F392DA8892FB9F2 91095~|~1~|~6~|~06/S<2~|~100% City Items - Repairs for urban paving section, culvert replacements, etc.~|~05 - 4R Maintenance - Resurfacing~|~7FC7FCCB2A1FA2D9079696C676AA5CBA5E12A407 91095~|~1~|~5~|~05/S<2~|~Urban Paving for WAY-3-17.61 to 17.89~|~05 - 4R Maintenance - Resurfacing~|~0DE642038C23286D0A02C43E1FEABFF9D67FBBBD 91095~|~1~|~7~|~07/SAF~|~Recessed Wet Reflective Pavement Markings~|~21 - Safety~|~2B11122BAEE2E2526729EEA6071C5C7204EB7AE9 126779~|~1~|~1~|~01/NHS~|~Reconstruct US-20 in Sandusky County between the SLMs of 27.55 - 30.98~|~04 - Reconstruction - No Added Capacity~|~6402E0D9DDCDFAD448235D1F21322582FFDEF8BF 102514~|~1~|~1~|~01/NFA~|~The City is reconstructing Cochran Road between the Carter intersection and the Ambina intersection~|~03 - Reconstruction - Added Capacity~|~F6345A457F732725C39DEFC2BE0F042138B8BDC2 111541~|~1~|~1~|~01/NHS~|~2" Overlay of Asphalt Concrete on: MOT-4-SLM 7.13 to 8.13 in the City of Moraine.~|~17 - Construction Engineering~|~4953855813A0100CEFD65FCD3B1AB69C5B7F6438 100906~|~1~|~1~|~01/STR~|~Rehab or replace various culverts in Preble County.~|~04 - Reconstruction - No Added Capacity~|~463F908EA757377B3FAECF9F74189E19337EA44E 127141~|~1~|~1~|~01/NHS~|~Noise wall along US-23 SLM 12.65 to Michigan state line~|~20 - Environmental Only~|~95D1F501D2E5ED234F252BA1C7BE1933FE7F799A 100322~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to STA US 62 from 30.12 to 35.50.~|~05 - 4R Maintenance - Resurfacing~|~3E5FCF0E4FC975778A0C4E1207D2C57F2436561B 100327~|~1~|~1~|~01/SAE~|~Railroad preemption and signal construction.~|~22 - Rail/Highway crossing~|~3CD75EEF988F520FD1AFDA9BAF06790AF1D398DE 92079~|~1~|~1~|~01/IMS~|~8703698 WOO IR75 12.94 Intersect: Us 6 8703728 WOO IR75 12.94 Intersect: Us 6~|~~|~DFD9FB8AF475274FA3B4D8EB24379C97CB68C0ED 101799~|~1~|~1~|~01/STR~|~CHP-29-0264-Reapir right side deck-edge, reface abutments using anodes & encase pier columns.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F275E3E43D16E76DFF590F225250E79CCC84B318 101799~|~1~|~2~|~02/NHS~|~Rebuild deck edges & encase pier columns. Reface abutments using SCC.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8436BCCC82BA7F536E178D9F12CB7E79B903392E 117665~|~1~|~1~|~01/IMS~|~Split for bridge work~|~47 - Bridge Preventive Maintenance~|~0FB4596BD58ADB8AF195B19808498747351E682E 105448~|~1~|~1~|~01/S<2/KCEO~|~Knox County CEAO Resurfacing Program - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing and related work on the OFAH-Urban portion of Knox County Road 6.~|~05 - 4R Maintenance - Resurfacing~|~39993A5C15FB38E552840D78FF7644468A85D1D5 105448~|~1~|~2~|~02/STR/KCEO~|~Knox County CEAO Resurfacing Program - 4B77 (80% Federal) / LNTP (20% Local) - See CAP Comment - Resurfacing and related work on OFAH-Rural portion of Knox County Road 6.~|~05 - 4R Maintenance - Resurfacing~|~3986DF9B653D6083A1BFEFC7841604769A2893F0 75745~|~1~|~2~|~02/IMS~|~Repair and Resurface I-71 in Clinton and Greene Counties. Also, resurface the ramps at the SR 72 interchange. The locations for the pavement areCLI-71 between SLM 7.27 to 15.39; and on GRE-71 between SLM 0.0 to 4.01.~|~~|~F9DBA5BF06AE56F758F8E41668640F8E1380EBD0 75745~|~1~|~1~|~01/IMS~|~Widen the mainline bridges including CLI-71-0725 (sfn 1401653), CLI-71-1212L (1401807), CLI-71-1212R (1401831), CLI-71-1237 (1401866), CLI-71-1399L (1401890), CLI-71-1399R (1401920), CLI-71-1421 (1401955), GRE-71-0150 (2901714), GRE-71-0253L (2901749), GRE-71-0253R (2901773), GRE-71-0299 (2901803), GRE-72-0029 (2901838)~|~~|~3CDF70E5A4893880B04F5AF788142A9A15D11A9F 93283~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) 3002586 GUE SR209 5.29 Intersect: I-77 Over Sr 209 & 821; Not BR Eligible for Rehabilitation: Length=148 SD/FO(0) SR=88.1 DSR=6; 2) 3002616 GUE SR209 5.29 Intersect: I-77 Over Sr 209 & 821; Not BR Eligible for Rehabilitation: Length=148 SD/FO(0) SR=92.0 DSR=6;~|~13 - Bridge Rehabilitation~|~93264D43762D9B635CBFFC4A3AE99BBD95A623F1 120921~|~1~|~1~|~01/NFP~|~Plan split for bridge operations~|~40 - Special Bridge~|~E545501CACDC25CBC5553AC10333227E69E39B7A 88819~|~1~|~1~|~01/SAE~|~District Wide Pavement Marking and RPM contract for FY2017~|~21 - Safety~|~9D45BA048F78C3649DE3D04B58F1D3BCEB779A12 126707~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 96 0.98-3.78. Funded through the Local Roads Oil and Shale Program. 100% State.~|~05 - 4R Maintenance - Resurfacing~|~14254354ADCF1A357EA963A90F68369F33592BD7 104834~|~1~|~1~|~01/SAE~|~Upgrade pavement markers on various county roads.~|~21 - Safety~|~C9FCDC099046672D10CE8FC71AB793C9092410E5 114457~|~1~|~1~|~01/SAF~|~Add sidewalk between Morgan St and Hamilton St on Clay St in Village of Green Springs~|~21 - Safety~|~7998D645755962977E96F22CE26882B316C1F9A4 115015~|~1~|~1~|~01/STR~|~Bridge replacements 10' to 20' structures.~|~~|~7C51F77A464B647F26869BAA4D2422C541134A65 91781~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. ATH 681 7.79-10.49, MEG 681 0.00-4.76 and 17.49-21.16. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~BC0D17F98A45F0DA2A272674CBC09D867FB1B87C 100484~|~1~|~1~|~01/STR~|~Crack sealing of various routes in District 11~|~99 - State Preventative Maintenance~|~E1F50D4687AE910B0F3C5B951ED028B5D72DE5BE 113964~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~C22FB4581655961978E33449525C7C9177AAFDFF 124798~|~1~|~1~|~01/ENH~|~Sidewalk replacement along Broadway Street in the Village of Belle Valley.~|~28 - Facilities for Pedestrians & Bicycles~|~2D4FCE85D6ECC49E064EC53E1A54C5D5401D41D1 121537~|~1~|~1~|~01/SAF~|~Fast Drying Pavement Markers~|~21 - Safety~|~BF69D93BB9BDBB4F7204CFB549FF129E5C591169 105148~|~1~|~1~|~01/BRO~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~13 - Bridge Rehabilitation~|~098A8AF38B2F617B1537D60F87ACCEE523823DE6 108158~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0931088980E5068DEA2E2205D577CFF629797578 113559~|~1~|~1~|~01/BRO~|~Plan split for bridge work~|~13 - Bridge Rehabilitation~|~3ED63C2534508B1144A3C4FCC0AF83978FDAF957 105661~|~1~|~1~|~01/MPO~|~Mill and resurfacing of W. Second Street including repair of deteriorated curb and inlets from S. Allison Avenue to S. Church Street (US-42). Installation of two Rectangular Rapid Flashing Beacons (RRFBs) at the Creekside Trail crossing.~|~05 - 4R Maintenance - Resurfacing~|~8CD583B452E77A01EB604B1F179898F47E021E67 105661~|~1~|~2~|~02/NFP~|~Resurfacing and base repairs on West Second Street from Massie Drive to S. Allison Avenue. This portion of the project is 100% locally funded (OPWC funds).~|~05 - 4R Maintenance - Resurfacing~|~EC7EE6C2AE390EA5DB2E3F0C99C32AD356B4AFDB 105661~|~1~|~3~|~03/MPO~|~Resurfacing and pavement repairs on West Second Street from Progress Drive to Massie Drive.~|~05 - 4R Maintenance - Resurfacing~|~A94BCDAB288FA94B628A419246A904E529BBB276 85273~|~1~|~1~|~01/NHS~|~resurface SAN US 20 27.56 to 30.97 ( RURAL ); East Clyde Corp line to West Bellevue Corp line~|~05 - 4R Maintenance - Resurfacing~|~845B9E0C39F0698DFC3FD9D081F4E9AAE4BF43F2 85273~|~1~|~2~|~02/NHS/CLYD~|~resurface SAN US 20 26.52 to 27.56; ( URBAN ); East St in Clyde to East Clyde Corp. line~|~05 - 4R Maintenance - Resurfacing~|~A0D298AA691C601B2C7988EADB3334BDABB14BA5 119717~|~1~|~1~|~01/STR~|~Rehabilitate bridge truss~|~13 - Bridge Rehabilitation~|~B62F694E94E2D460BD6A14F5FAFD39032EE00987 111349~|~1~|~1~|~01/NHS~|~Repair bridge damage caused by a hit by an over height vehicle to BEL-7-22.16 (SFN 0700630) by replacing part of the damaged beam, using Type A emergency.~|~13 - Bridge Rehabilitation~|~B008469DBBABD105D408EEB45757E9662DFB1398 110423~|~1~|~1~|~01/SAE~|~Construct an RCUT intersection at SR-4 & SR-4 Bypass (northern intersection located northeast of the City of Hamilton in Fairfield Township).~|~21 - Safety~|~08428FAF37B015D2716F038EC90F2174A5512F1F 105485~|~1~|~1~|~01/SAF~|~District wide fast drying pavement markers.~|~21 - Safety~|~D4130746917208CBDEC43B1FA8F3B7DE0CB04697 111544~|~1~|~1~|~01/MPO~|~TMACOG TAP funded items~|~28 - Facilities for Pedestrians & Bicycles~|~4A55AEE86C334E626290F04EAB2383C30E32A676 109870~|~1~|~1~|~01/NFP~|~D09 Guardrail FY25~|~21 - Safety~|~29486C6A65B30F0841D3DF5892046428A1C6912F 90415~|~1~|~1~|~01/NHS~|~Widening of State Route 241 from Raber Road to State Route 619, in the City of Green, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~A99ED216437F848EF1C68CFD0622B31FE4E254F8 84476~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7844867 TRU Mayburn Corners Bridge over Sugar Creek.~|~10 - Bridge Replacement~|~081C3353BC5A47E468EC54DB0E841ED506F672E0 90670~|~1~|~1~|~01/MPO~|~WOO TR105 2.4-2.42 / WOO TR696 0-0.13WOO Eckel Jnctn/Carronade Intersection improvement~|~04 - Reconstruction - No Added Capacity~|~8AF65107DC4DFDE172882A5BC7C09C685F254EB4 95956~|~1~|~3~|~03/NFP~|~New 60' x 100' fabric salt bilding at 3800 tons. Demolish old salt barn.~|~44 - Other~|~396742DB26269060BE1AA02B3D148F10A74404D1 95956~|~1~|~1~|~01/NFP~|~New 60' x 100' fabric salt building at 3800 tons.~|~44 - Other~|~43905B7B2B93CF8089F9E8FE37A78F36808C00B7 95956~|~1~|~2~|~02/NFP~|~New 40' x 60' Pole Building with 3 bay cold storage at 2400 square feet.~|~44 - Other~|~A1B8D759B7C202AF53A3827244925682A38ED9C3 95956~|~1~|~4~|~04/NFP~|~New 40' x 60' Pole Building with 3 bay cold storage at 2400 square feet. Demolish salt/lean-to building.~|~44 - Other~|~EA92CC84A669BA99F8A2EB286F4C0058F7AA700C 86291~|~1~|~1~|~01/IMS~|~Deck replacement on steel beam bridge. Ramp DA 70WB to 315 NB over 315 NB. SFN 2514893~|~13 - Bridge Rehabilitation~|~FDCBE5F316A80CBC49F965E1580E62DBFE4483CA 99726~|~1~|~1~|~01/NFP~|~Repairs to the front parking area of the Sunside Trailhead, part of the Trumbull County MetroPark District.~|~~|~AF62A17962273BB316899E933FD6C31E1F77C766 112672~|~1~|~1~|~01/NFP~|~What is in 1.3 of the agreement~|~~|~B339EB1AC4E8BC2B047AA6AFB90ED57B35335493 89401~|~1~|~1~|~01/STR~|~On SR770, 0.08 mile south of McCreight Bridge Road (TR411) (SLM 2.06 to 2.13), it is proposed to provide support for the shoulder and roadway along the west side of pavement.80/20 split 01/STR/OT/State~|~21 - Safety~|~C17F47D3859B4164B31369C787E42D3B6B425F24 121337~|~1~|~1~|~01/NFP~|~Created Plan Split for TID Involvement~|~44 - Other~|~131BF9F22BD0724AB68D3AAF37E61486EE1BAC10 101467~|~1~|~1~|~01/STR~|~Raise Pavement Markings~|~21 - Safety~|~CA51DA22C702AEB6EBA818372D409CD8DF7CA1D1 100962~|~1~|~2~|~02/S<2~|~Overlay US 35 in Montgomery County: MOT US 40 SLM 11.69 to 13.33~|~05 - 4R Maintenance - Resurfacing~|~DE240A0B17B4F036E7BFEAC62674BC5A31F94F35 100962~|~1~|~1~|~01/STR~|~Overlay US 35 in Montgomery County: MOT US 35 SLM 4.05 to 5.75~|~05 - 4R Maintenance - Resurfacing~|~3752FAE3414F7A80D49742D4F4BF3BB44AD3D638 119283~|~1~|~1~|~01/NHS~|~FRA-315-9.24: place liner in culvert under SR 315~|~04 - Reconstruction - No Added Capacity~|~96025793520C761D33421E99206B6981F4294C61 123299~|~1~|~1~|~01/S5K~|~Resurfacing SR 9 and SR 14 in the City of Salem~|~05 - 4R Maintenance - Resurfacing~|~3498D606C465497DF99DE8C45683C4AAE0EBC606 123299~|~1~|~2~|~02/S5K~|~100% City work, including curb ramps and auxiliary pavement markings~|~05 - 4R Maintenance - Resurfacing~|~559CBA85F855A1DD3B4168E4719D9B7C7C1F38E6 125723~|~1~|~1~|~01/NFP~|~Crack sealing throughout District 11~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8454CC92836DCAB086E4AF1825B74EA9C5496400 127015~|~1~|~1~|~01/ERD~|~Federal Earmark OH468 for the rehab of the East Broad St bridge SFN 4770579~|~47 - Bridge Preventive Maintenance~|~4EC151DDF08E1BE40EF7029DDCBC9539F5E26E23 101827~|~1~|~1~|~01/STR~|~Guardrail upgrade project on MEG CR 33A 0.00-3.38. 100% Federal funds, CEAO HSIP.~|~21 - Safety~|~71AA7F943A1B5E6553771C854A7F33ACD6C3F616 92515~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~0DE46DAF4CB7839AD7CDA7FAB5168C0125636D00 107932~|~1~|~1~|~01/STR~|~All work in this split. Resurface on SR 49 using district preservation funds (80% fed and 20% state).~|~05 - 4R Maintenance - Resurfacing~|~C129561B5238A79B109605972E106DBE33ECDD7C 127072~|~1~|~1~|~01/NFA/NILE~|~New sidewalks, crosswalks and traffic signals.~|~28 - Facilities for Pedestrians & Bicycles~|~CEAB70805FA58EC5B2493CC7EA41FE8207121440 102816~|~1~|~1~|~01/STR~|~Soil Nailing project. $200,000 of Capped 4SS7 funds being used. Remaining funds are 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0AEC199ABFBB291D4A9462738C7F1C9C29C2159D 105029~|~1~|~2~|~02/NHS~|~Split for pavement work on the NHS~|~07 - 4R Maintenance - Relocation~|~54573AF8847FED756E51E5B1AB64B147206023EC 105029~|~1~|~1~|~01/BRO~|~Split for bridge work~|~10 - Bridge Replacement~|~B28730D5F886664B9AC5146E16FD446856605169 105029~|~1~|~3~|~03/NFA~|~Split for work on the new pedestrian bridge over the Grand River.~|~10 - Bridge Replacement~|~E4BB0A3FDD5CBC8CD6364EE2443B9BEA41F2B526 105029~|~1~|~5~|~05/NFP~|~Split for retaining wall repair~|~10 - Bridge Replacement~|~8DB1ED7C4A1FCAC6C58D7D17EDF3CEF616861BC6 105029~|~1~|~4~|~04/NFP~|~Split for steel storage costs~|~10 - Bridge Replacement~|~4066E11799D5E40A266F53276DA240EE0232C411 112820~|~1~|~1~|~01/STR~|~Resurfacing SR 9~|~05 - 4R Maintenance - Resurfacing~|~A8B99BAB0D9E795F43629E5DA654EC8DE1D11F2E 98330~|~1~|~1~|~01/STR~|~Plan split to include all costs associated with the scour repair of the WAR-22-10.54 bridge.~|~13 - Bridge Rehabilitation~|~199483244B38B00043C2634FE519ADD539CE761C 90431~|~1~|~1~|~01/STR~|~Bridge replacement project. MRG 60 1843 (SFN 5800439). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~0679C51ED9AEEF00568D817AF24B8081174CCD03 96363~|~1~|~1~|~01/BRO~|~Remove and replace LMC overlay using hydrodemolition, patch or rebuild refaced railing. Check expansion joints are sealed when complete to stop leaking. SFN 1201549, CLA-41-1225 over IR 70.~|~13 - Bridge Rehabilitation~|~4D700FA2EB4C94F0073F6C113DB4A3EFCD707339 124389~|~1~|~1~|~01/NFP~|~Bridge work throughout District 5.~|~47 - Bridge Preventive Maintenance~|~9A91FC2D13D3CFFC4165D84EA1F63964FE65C029 119269~|~1~|~1~|~01/STR~|~Tree stump removal and pruning.~|~44 - Other~|~3FBD4D2AB9DC290F67FC3F54E5F0FD387C82F7EE 101063~|~1~|~1~|~01/S<2~|~Small City~|~03 - Reconstruction - Added Capacity~|~DEB0B98C9A01B918F7193E3B93133806CC43B1D1 90406~|~1~|~1~|~01/MPO~|~MORPC/Columbus widening of Lazelle Rd with roundabout at S Old State Rd~|~03 - Reconstruction - Added Capacity~|~AA51A19071057C6EBC0CF79F8A0E8E09D9137642 84531~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. WAS 7 20.37-20.57. NHS Federal/State 80/20%.~|~05 - 4R Maintenance - Resurfacing~|~11BC87DD08C3E3610FE89693DF23A2AE1E461C7B 84531~|~1~|~3~|~03/NHS~|~Curb ramps within the City of Marietta. Funded 100% local.~|~05 - 4R Maintenance - Resurfacing~|~A3187CB65F79D11947AA22FC4C406AE1911A9AD2 84531~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using a mill and fill treatment. WAS 7 20.57-21.50, 21.76-21.85, 24.31-24.50. WAS 60 0.18-0.27. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~E2228DF165EC724E4DE2BA2EE1A2A675AEC776B4 117907~|~1~|~1~|~01/NFA~|~NEVI Phase 1, I-70-E, 155-160 Musk ~|~63 - Electric Vehicles & Charging Infrastructure~|~B7CA247206E8567A9EF668172F09BF97AFEE5B70 121116~|~1~|~1~|~01/S5K/LCEO~|~Rehab of structure~|~13 - Bridge Rehabilitation~|~84D8559F6E0CBF33A3DFB112A57859587FA07302 123202~|~1~|~1~|~01/SAF~|~Provide ITS maintenance on various routes in District 6~|~21 - Safety~|~FF4A7D4F56D60431C7DE1BCFCA20B23701205BCD 95977~|~1~|~1~|~01/STR~|~This split is for the building of the south bound left turn lane, new traffic signal, and the minor realignment of TR 1131 to improve the intersectio angle with SR 7. This funding split is capped at $500,000 from the School Entrance Grant (SAC 9SC7) that Beaver local received from the OSFC. The remaining construction contract will be from district SACs 4PF7 & 4PS7 funds. This project is to improve access to TR 1131 due to the new K-12 school campus for the Beaver Local School district being constructed on TR 1131.~|~21 - Safety~|~56269B2E1696EF16FD271C65E5C6DFFED65722F7 103097~|~1~|~1~|~01/STR~|~All items of work on MRW-61~|~05 - 4R Maintenance - Resurfacing~|~8FAC7D376E78E02F0988A6FB07F4880E4D6BF034 121513~|~1~|~1~|~01/SAF~|~Guardrail replacement & adjustment~|~21 - Safety~|~08594202693CBC389F28D85D9095E3BDC77B1A96 126030~|~1~|~1~|~01/NHS~|~Establishing Funding~|~05 - 4R Maintenance - Resurfacing~|~95FFF536D89C23DBF3D65BF928BB90DBFDAB49D5 124045~|~1~|~1~|~01/S50~|~Plan split for STBG eligible construction items. ~|~28 - Facilities for Pedestrians & Bicycles~|~CB5C28CAC55757B1689656CD42729A63407BD8EA 124327~|~1~|~1~|~01/ENH~|~Funding splits for TAP/Safety funding for pedestrian improvements~|~28 - Facilities for Pedestrians & Bicycles~|~A7E80B8E5A20CC0F1C3688E2B6C063BC266204EF 104271~|~1~|~1~|~01/NFP~|~Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~744F53BCC598176E378536FC8655B4D4A6358456 118677~|~1~|~1~|~01/BRF/STRU~|~Bridge replacement.~|~10 - Bridge Replacement~|~E1071A7CC471E5D4D2C4558932818A8EE8F9A547 114550~|~1~|~1~|~01/STR~|~AC Overlay without repairs.~|~05 - 4R Maintenance - Resurfacing~|~80C7D17C6E6D55667FF2E991F2AEAA400EBACDDA 114550~|~1~|~2~|~02/S>2~|~AC Overlay without repairs.~|~05 - 4R Maintenance - Resurfacing~|~1EE4A0EAA6B0D42F188B4FEDB8D9BA06B21D1F01 114550~|~1~|~3~|~03/S5K~|~Resurface with Asphalt Concrete~|~05 - 4R Maintenance - Resurfacing~|~2F5632366BB9E406B1B77E841D3368F64C98F2D9 25688~|~1~|~2~|~02/S<2~|~D6 federal/state funding for resurfacing from SLM 18.01 (ramps W of US-23) to 18.22 (Pole Lane). Minor bridge work and guardrail over Graves Creek02/S<2/PV/~|~05 - 4R Maintenance - Resurfacing~|~30B058F0ECF3315BDC46BA86294333C3F59C5FA1 25688~|~1~|~1~|~01/SAF~|~100% Safety funding up to safety cap for SLM 17.08 (left Marion Corp) to 18.01 (Ramp W of US-23). Resurfacing, sidewalks, stripe bike lane, drainage, pvmt markings, signing, signals, turn lane, improve drives and intersections. Safety items for entire project01/SAF/OT/~|~21 - Safety~|~EBBCC1A88D37BA70ED25B583A7E1EEF1571758CB 124621~|~1~|~1~|~01/ENH~|~Primary plan split for SRTS funded part of the project. ~|~28 - Facilities for Pedestrians & Bicycles~|~8114A6E2495301ECDC66327595D4D41A96F50E2D 89179~|~1~|~1~|~01/CMQ~|~Intersection of Bethany & Mason-Montgomery Roads: 750' on all four approaches to the intersection. Project involves improving the intersection by constructing a two-lane roundabout with two lane approaches and departures, curb and gutter, storm sewers, bike path, sidewalk, a culvert replacement, and necessary utility relocation.~|~21 - Safety~|~69C3D13627C6C84D3AAF9DF69AE2D5F244084DF0 118712~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 7.26-10.722.~|~05 - 4R Maintenance - Resurfacing~|~898D08B73BAD3F099C0CF6EF9F18FD752CC3A2A5 118712~|~1~|~2~|~02/S5K~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 10.722-12.04.~|~05 - 4R Maintenance - Resurfacing~|~CDE383F41EB37D164F51E83F8BAD83AC08A625D3 105992~|~1~|~1~|~01/S>2~|~Plan split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~5BF23EFE4E598BA76EE10D19DC1E65D386E949B7 105992~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work~|~05 - 4R Maintenance - Resurfacing~|~35DC40D12999A150634B6F09A1B0EEAF4F9DA9B6 95742~|~2~|~1~|~01/NHS~|~NHS Portion (US 24 9.64-15.85)~|~05 - 4R Maintenance - Resurfacing~|~E770B80A5573C51F54085FF468411D87926B9D5C 95742~|~1~|~2~|~02/NHS~|~Bridge Split~|~47 - Bridge Preventive Maintenance~|~2D590A69FCAE2776B9EFB7C8EED8C50B8FAE907F 104668~|~1~|~3~|~03/IMS~|~Bridge rehab - no added capacity~|~13 - Bridge Rehabilitation~|~D9607EDA3DFE9061B97162E77FB7C75EFD8BF471 104668~|~1~|~4~|~04/IMS~|~Reconstruction - no added capacity~|~04 - Reconstruction - No Added Capacity~|~1E4D5DE95343C456368408C832FCBA8BC5D9B1CA 104668~|~1~|~1~|~01/IMS~|~Bridge work added capacity.~|~13 - Bridge Rehabilitation~|~51366C78947B111AC13B2228A6453CEA2DB38399 104668~|~1~|~2~|~02/IMS~|~Roadway Added Capacity MCE 5B~|~03 - Reconstruction - Added Capacity~|~62B6B54F787E2F074B503DC6A74C9D959A3C28F1 104668~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~94BC292C1FE18DE23CE959CDEA915BC3CF51F6E0 127024~|~1~|~1~|~01/NFA/HEAT~|~SRTS - Design and construction of sidewalks in the City of Heath.~|~28 - Facilities for Pedestrians & Bicycles~|~0636E444E124579FD8584C36BAAB69E4BF926FF6 114870~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~5AB2F098971761E1458AE37126A0BE0528016750 109367~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 537 0.92. Funded 100% state ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FF75D84C8245CD88D340C64C250F5A05B0F8E493 112770~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract for FY2026 in D8. Locations to be determined.~|~21 - Safety~|~3723ACA8D4ADB728E24B0C879E6D0FAC3DA8ADAE 101624~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan split for resurfacing on Kno-SR 95-(5.69-11.50)~|~~|~6F03ECF720052E4B25C5C8D27F149DBAA157A7B6 112324~|~1~|~1~|~01/NFP~|~Bridge Elec. Plans split~|~44 - Other~|~0832B15E29BD1FF1DB11518BD0D93655994BEE0A 114075~|~1~|~1~|~01/S<2~|~Storm Drainage Repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6158D4E68413776D65F1755B067A81F69DDBD6C8 112389~|~1~|~1~|~01/BRO~|~Invert field paving of corrugated metal pipe bridge carrying SR 39 over Corns Run.~|~04 - Reconstruction - No Added Capacity~|~B4028885C14A196E3293059D59D46B818D6C33F5 110415~|~1~|~1~|~01/NHS~|~FY23 Urban Paving on SR 4 In the City of Fairfield.~|~05 - 4R Maintenance - Resurfacing~|~60FFA6A119405F0B9F9112129DE0D3DC5166DF19 110415~|~1~|~2~|~02/NHS~|~This plan split is for items to be paid 100% by the City of Fairfield.~|~05 - 4R Maintenance - Resurfacing~|~77A89DA884EEF05413C94AD77D2989B67E45A27B 110415~|~1~|~3~|~03/NHS~|~FY23 Urban Paving on SR 4 in the City of Springfield.~|~05 - 4R Maintenance - Resurfacing~|~C801D4935C107CBEB221D13DD773D5B10503285C 110415~|~1~|~4~|~04/NHS~|~This plan split is for items to be paid 100% by the City of Springdale.~|~05 - 4R Maintenance - Resurfacing~|~F469722E2E3AF224F2F4816C40BE83F8D0BFA9C0 112736~|~1~|~1~|~01/NHS~|~Overlay and abutment repair to MRW-314-20.17 and MRW-314- 25.8~|~13 - Bridge Rehabilitation~|~326F923A29B7C5389A84590700D5F51E224A5D04 107117~|~1~|~1~|~01/BRO~|~Replace existing bridge CAR-542-0945, SFN 1001981 with new composite precast concrete box beam bridge.~|~10 - Bridge Replacement~|~33A1BD6B300680CE8FEE30AE495E119E1C8BD922 114408~|~1~|~1~|~01/NFP/GCEO~|~"01/NFP/PV/GCEO" resurfacing and related work on CR 73~|~05 - 4R Maintenance - Resurfacing~|~FFB258C363032F240AC00A12B6A181B1F95CD2FE 76778~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using Major Rehab funds.~|~~|~D5C56D7B49A3183E62F8156F401A6CF7ECFFBF95 112171~|~1~|~1~|~01/SAF~|~Implement various traffic signal, signing, and pavement markings upgrades in Eastern Corridor, Segment II/III are, as recommended in the 2019 Implementation Plan (PID 86462) On Large Urban Routes.~|~21 - Safety~|~8ABFA175B44AC25C37864F93CCB2DDD48E7E6F8D 112171~|~1~|~2~|~02/SAF~|~Implement various traffic signal, signing, and pavement markings upgrades in Eastern Corridor, Segment II/III are, as recommended in the 2019 Implementation Plan (PID 86462) On NHS Route.~|~21 - Safety~|~64B5B5C2EC445102E0C723A9174DC093D1FFBC37 103293~|~1~|~1~|~01/SAF~|~Construction of a roundabout at Cleveland/Massillon and Rothrock Road.~|~21 - Safety~|~38105B1DE16563FF09122B3FB0B3889E0EB48317 113109~|~1~|~1~|~01/NFA~|~Pavement Split~|~05 - 4R Maintenance - Resurfacing~|~9C639B6F13E2D9D07568AF32228ACCF58DF40CB8 92014~|~1~|~1~|~01/STR~|~BRO 353 0.00-4.60~|~05 - 4R Maintenance - Resurfacing~|~F176B24A28F53ED396D341ED0D3077A0AB52CBCB 92014~|~1~|~2~|~02/STR~|~Bridge preventative maintenance BRO 353 1.26 0803375BRO 353 2.77 0803391BRO 353 2.89 0803413~|~47 - Bridge Preventive Maintenance~|~CA2D19DAF39E6F219048CEB620ACAE627BB2CED4 95175~|~1~|~1~|~01/SAF/LCEO~|~"01/SAF/OT/LCEO" Licking County guardrail project on various county roads funded thru CEAO Safety Dollars~|~21 - Safety~|~7E96F7142930CDC1AEA76D276574DDBD3621468A 98479~|~1~|~2~|~02/NHS/MUNR~|~Resurfacing, split corp portion in Munroe Falls.~|~05 - 4R Maintenance - Resurfacing~|~58AD63CE6B66B0C3E13D290EC01EEA0DA761EF0A 98479~|~1~|~1~|~01/NHS/TALL~|~Resurfacing in the City of Tallmadge, includes split corp section.~|~05 - 4R Maintenance - Resurfacing~|~767BC378DC6077C7569FFE917326DE5EC68C1755 114039~|~1~|~1~|~01/S<2~|~Pavement repairs along Fairfield School Road with drainage and curb replacement also along Fairfield School Road and Lisbon Street. (4B97 Small City Program is to provide 95% of the eligible costs, up to a maximum of $1,540,343)~|~05 - 4R Maintenance - Resurfacing~|~A7E70546CC56B7A482BF4896BC62586F720C4617 114527~|~1~|~1~|~01/STR~|~Overlay in LAW.~|~05 - 4R Maintenance - Resurfacing~|~FF849861514BCA200B4C152D6A2C7CEA8E408943 114527~|~1~|~2~|~02/STR~|~Bridge PM~|~47 - Bridge Preventive Maintenance~|~01C3ADA613EB007BB97AEE0AB125DD68C5A3E772 123364~|~1~|~1~|~01/STR~|~Resurfacing SR 165~|~05 - 4R Maintenance - Resurfacing~|~CCA1E51197B8339A03BA4689D1CCD150496B5618 90590~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MRG CR 2 A. MRG CR 2A 0.00-2.47. Federal 80%/Local 20%.~|~05 - 4R Maintenance - Resurfacing~|~A5361A94F82C827AA80D30482F5C3237EBE669FE 116696~|~1~|~1~|~01/STR~|~All work is in this split.~|~05 - 4R Maintenance - Resurfacing~|~D517256224C82B2F5D017292F8CEE416E04280F7 121169~|~1~|~1~|~01/NFA~|~Roadway rehabilitation utilizing 100% State CDP funds (4CS7) up to CAP.~|~05 - 4R Maintenance - Resurfacing~|~A4DE10A9C49C57419BF940B46A827F17417F9BAE 110192~|~1~|~1~|~01/S5K~|~SEN-12 from SLM 0.589 - 0.705~|~05 - 4R Maintenance - Resurfacing~|~C39B6AC5089C79AACDD562666079B6ADE9E6F92B 110192~|~1~|~2~|~02/NHS~|~SEN-12 from SLM 0.00 - 0.288 and SEN-23 from SLM 11.88 - 12.35~|~05 - 4R Maintenance - Resurfacing~|~82809C47617A61E2065CE7F5487F20DC2679F053 112271~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 144 1.99-2.03. Rural route funded 80 Federal/20 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~240AB0A00AF171E1AA6CEBA64ABD3CA71EA8CCA0 112271~|~1~|~2~|~02/STR~|~High Speed internet costs for field office.~|~17 - Construction Engineering~|~73864CF040AC361500D592E998FD98ED2C60298D 113737~|~1~|~1~|~01/SAF~|~Plan split for safety related items - signal, mast arms and median~|~~|~A433F8E4605563BC7A50D7F1AC9BBDF1D1600AE6 95085~|~1~|~3~|~03/NFA~|~Construct a noise wall at the District headquarters~|~44 - Other~|~23263C17FBBF39AC38BA79D49606F37277F4E6A6 95085~|~1~|~1~|~01/IMS~|~Major new funding for new noise wall at I-270/Linworth~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~326BD56863BDCCC64F6E5A9508ED3F7965D40BD4 95085~|~1~|~2~|~02/IMS~|~Plan split for noise wall repair on IR 71 due to crash. To be reimbursed by insurance company~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DFAA10C89A132BF311A4C9F76CAEEA236B62E8F1 115743~|~1~|~1~|~01/IMS~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~29BEAC36CFD6602412164EFF4A6554AE4D3B2D08 122653~|~1~|~1~|~01/NHS~|~D10 Extrusheet Sign FY2026. NHS routes. ~|~21 - Safety~|~56FF23BF63F8EB71267C227D4001BA3D1E30BC2E 122653~|~1~|~2~|~02/STR~|~D10 Extrusheet Sign Replacement FY2026. Rural routes.~|~21 - Safety~|~45ABBE1308046CDA670C55B608DFEA7A1C10D084 107677~|~1~|~1~|~01/STR~|~Resurfacing on SR 37 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~57332815F7D57373EC787C258063EF3D225677F8 116029~|~1~|~1~|~01/STR~|~Plan Split "01/STR/PV/ " - 4PF7 (80%) and 4PS7 (20%) - district wide spot pavement repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D1A70FA973E7E0BF8C2E8C8D051B6E6B9A67ED21 120316~|~1~|~1~|~01/S>2~|~Construction of drainage improvements on SR 126 in Miamitown (SLM 1.40 to 1.86). ~|~~|~F185FA5285D3DF82C5B68B1D53AB15CC19DECD4C 119602~|~1~|~1~|~01/ENH~|~TLCI items.~|~28 - Facilities for Pedestrians & Bicycles~|~F91CA087B3EB0F58067217524B5DA87615245CAF 96558~|~1~|~1~|~01/NHS~|~Resurfacing of STA US 62 from 37.90 to 38.60.~|~~|~4CA418F0D3683D2004213F2C64CF8F50F33F0DAE 75559~|~1~|~1~|~01/NFP~|~Block plan split.~|~44 - Other~|~1DC2BA96372A47D06FF029ECE846D29E7ED3DECF 75559~|~1~|~2~|~02/NFP~|~add plan sign plan split.~|~~|~12B873EFF03B117EF5F289F23E339E80F37F3B90 116040~|~1~|~1~|~01/MPO~|~Coy Road Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B76E5B574BB9BF9941B9AAC8219CB2EA2A151E35 124388~|~1~|~1~|~01/S>2~|~Resurfacing. ~|~05 - 4R Maintenance - Resurfacing~|~2C1F7ED63442E1FA7109E1B7D5AD77203EEAA447 124388~|~1~|~2~|~02/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~36D911DCA3957480A325678475D13EF02F5B89B9 124388~|~1~|~3~|~03/NFP~|~Pavement repairs and other 100% city items.~|~05 - 4R Maintenance - Resurfacing~|~ED630CB9EC7ACC55C27E01F8543659C3EC7737C8 124388~|~1~|~4~|~04/SAF~|~Guardrail items.~|~21 - Safety~|~C7B3343F378FFD4D305B56D8A29F2BC867903FFD 122855~|~1~|~1~|~01/SAF~|~Funding splits for Safety funded scope~|~28 - Facilities for Pedestrians & Bicycles~|~95D19D427446BD6B30C4AAF6BFB8751521AADEC3 113664~|~1~|~1~|~01/MPO~|~Widening of North Fairfield Road from Fairbrook Elementary School to Plantation Place to provide a center two-way left turn lane. Addition of sidewalk on both sides of the roadway.~|~~|~41C51093BB88584F2067BE9632846ED3CC8E829D 112860~|~1~|~2~|~02/S<2~|~Overlay on LAW 7~|~05 - 4R Maintenance - Resurfacing~|~D4CD883089E6FCA911A794B456B32C8A6103A8F8 112860~|~1~|~1~|~01/NHS~|~Overlay on LAW 7~|~05 - 4R Maintenance - Resurfacing~|~A37029A472BF2382218A41B2D70449F1FDC78183 90598~|~1~|~1~|~01/IMS~|~Replace bridge deck:SFN 2512750, FRA-270-3.09, under CR258/Big Run So RdNot BR eligible on 12/7/12~|~13 - Bridge Rehabilitation~|~B0AC3A4942DD37EE465423A42FDA76CEF4377E3E 88425~|~1~|~1~|~01/STR~|~Culvert joint repair. VIN 50 21.11 (SFN 8200521) and 21.57 (SFN 8200556). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~FE2D24253A18FCD732F0AE7F699BB1FBF48C8D09 92339~|~1~|~1~|~01/ENH~|~This split is for work approved for funding with Transportation Enhancement funds. Work is for restoration of the Indian Mill bridge over the Sansusky River in Wyandot County.~|~30 - Scenic or Historic Highway Programs~|~987234257672D44F69C9B9B45E2471F463606981 86656~|~1~|~1~|~01/MPO~|~Widening from 2-5 lanes, the center 12' lane will function as a two-way left turn lane, design of the typical section will include improvemetns such as curb, sidewalk, closed storm drainage, etc. Other improvements to be constructed include utility relocation and aesthetic enhancements on North Dixie Drive between approximately Bartley Road and 1000' South of Benchwood Drive.~|~03 - Reconstruction - Added Capacity~|~4885B678651B3E5D9443B1128E55D88005A532F1 86656~|~1~|~2~|~02/CMQ~|~Installation of sidewalks on North Dixie between approx Bartley Road and 1000' South of Benchwood Drive~|~28 - Facilities for Pedestrians & Bicycles~|~532311820A03E1A211C0AB1A607FDCB28565DA3A 114913~|~1~|~1~|~01/NFP~|~Crack Seal plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D1675C07CB6465E1CDBE2E8F54B2CFA2A1C3C0AD 115950~|~1~|~1~|~01/STR~|~Asphalt resurfacing project on MOE SR 78 8.13-9.17. Work includes a culvert replacement and flashing signal replacement. Funded through the Local Roads Oil and Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~1499D935830617D06EC15516F993C11A3A9536C4 115950~|~1~|~2~|~02/STR~|~Reimbursement for materials that were taken into State Inventory. 100% State.~|~05 - 4R Maintenance - Resurfacing~|~8438DA30224F185593223B54FA6D04E2AFA17523 98757~|~1~|~1~|~01/ENH~|~Construction of a new multi-use trail from an existing drieway at Glen Hills Way near Western Hills Sports Mall to an existing trail near the Dunham Recreation Center.~|~28 - Facilities for Pedestrians & Bicycles~|~9FF6621E4C9C60772B2E9F358F2736DEBF7B723D 108915~|~1~|~1~|~01/ENH/BUCK~|~Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Sidewalks and Drainage on 1) Lic-SR 79-03.67 to 04.08;~|~04 - Reconstruction - No Added Capacity~|~C82A57B014ACA66785B245D9FC503434099F7167 99783~|~1~|~1~|~01/S<2~|~Marion large city funding to resurface SR-95~|~05 - 4R Maintenance - Resurfacing~|~862FDE4A8CFB634B97CD2F8E1778B1A8B74508C3 99783~|~1~|~2~|~02/S<2/Mar~|~!00% City of Marion items~|~05 - 4R Maintenance - Resurfacing~|~B6EF9E97AD53963708B269CF4CF86B363B6BB9F6 78247~|~1~|~1~|~01/NHS~|~Priority system resurfacing of BEL-7-8.70 to 11.87; includes resurfacing with double microsurfacing, minimal pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~799F000C29D4872FFB56CD32325DFEC5FC01A2D3 107059~|~1~|~2~|~02/NHS~|~Plans split for full depth Shoulder repair on NHS Route: Woo-SR 420~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~45065E336D952D3F4BA3996ADD33671E1EAD0A8E 107059~|~1~|~3~|~03/S>2~|~Plan split for Full Depth Shoulder Repair on S>2 Route: Luc SR 64~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F3F6CC839CDA5F962B650A274DD0861E851B140 107059~|~1~|~1~|~01/STR~|~Plan Split for Full Shoulder depth repair on rural routes in Williams, Henry and SR 295 in Lucas county.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AC33E66F00CEC7C501219EC59DF8DEB203D0345E 104752~|~1~|~1~|~01/SAE~|~plan split~|~21 - Safety~|~8D41EEB528330D36618FB3AD2FE043C8FD7ECEFE 104866~|~1~|~1~|~01/S>2~|~Resurfacing of Commerce between 5th Street and Federal Street in the City of Youngstown, Mahoning County, Ohio.~|~~|~BB68D3671F98857514CEFA5BFD8091E1E15DF5DF 119099~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~076417F67EF7C09DA6D0C11429F78CC7D577C772 96319~|~1~|~1~|~01/STR~|~Resurfacing - Rural:CRA 61 SLM 9.20 - 12.02 RIC 61 SLM 0.00 - 3.12~|~05 - 4R Maintenance - Resurfacing~|~2E9086BEB7951AE78BF851A9AE9463E0B8595F36 96319~|~1~|~2~|~02/S<2~|~Resurfacing - Urban: CRA 61 SLM 8.74 - 9.20 (Galion) RIC 61 SLM 3.12 - 3.88 (Shelby)~|~05 - 4R Maintenance - Resurfacing~|~95F0F8B590A4AE11157EB797A2C4588B89829A95 110962~|~1~|~1~|~01/IMS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~05C216AF7DC8506F147D543231D65A0FBA3B7652 82259~|~1~|~1~|~01/NHS~|~Sign Replacement~|~21 - Safety~|~1AA9533221092CC97D562B0594B893DC597E59B7 80195~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~C2F35C9D763028F42D5B02FAF3E5C2F8D8BAD5BE 122136~|~1~|~1~|~01/ERD~|~road diet and buffered bike lane including crosswalk improvements and collection of volume and speed data~|~~|~1CD6B2A990FD67724F6CD4AF71C8F388297DA7DC 122136~|~1~|~2~|~02/SAF~|~80% CEAO HSIP, 20% Local up to $489,600, 100% local after cap and for non-eligible expenses in construction~|~21 - Safety~|~55B2B4C97E6B40E5ED03423F3757575B7C6AE5B5 110009~|~1~|~1~|~01/NFP~|~CrackSeal~|~44 - Other~|~CC3575DD752E9376D0D3A45DF682CFB4DF2A84E7 107873~|~1~|~1~|~01/NHS~|~All work in this split. Resurfacing of SR15 using district preservation funds at 80% federal and 20% state.~|~05 - 4R Maintenance - Resurfacing~|~2AEA8EC2E40F8F5370C50DE02D4053D335F15EC4 107878~|~1~|~1~|~01/STR~|~District preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~0AA7E1C1258E7E746DA7523F192D6335B38E7292 110851~|~1~|~1~|~01/SAF~|~Safety improvements to IR-71 eligible for federal HSIP funding~|~21 - Safety~|~096071BACB689B6A0EE8805349669576B352469F 107416~|~1~|~1~|~01/NFA~|~Reconstruct Wegman Drive~|~01 - New Construction~|~D9AFBC2D881065A0D81BF0601FC66E16DBEE499E 123881~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~16CEB681562A25D744E3583FB767BAB24382C8E3 126832~|~1~|~1~|~01/S>2~|~Created new plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~015D06CBB6522EAF2AC54AEF713DD0D4A5D345F8 113475~|~1~|~1~|~01/S<2~|~Demo along bypass.~|~44 - Other~|~7E00F16963BF9E7BA9703FC3C7A07130C42E4669 117615~|~1~|~1~|~01/S5K~|~All work is included in this plan split. ~|~05 - 4R Maintenance - Resurfacing~|~42D2FF3DFEED2FC41D3A96E3B1AE13424CDD1A45 83441~|~1~|~2~|~02/S<2~|~Bridge Repair RIC-042-11.95~|~13 - Bridge Rehabilitation~|~1803F4A82E468F163D8AF4D39BC6998F73A9EBCD 83441~|~1~|~1~|~01/NHS~|~Bridge Repair RIC-013-14.15~|~13 - Bridge Rehabilitation~|~60A8C62FBF4E910EAF5C4597A746E5EA1F8CB12F 95755~|~1~|~1~|~01/NHS~|~OTT-2 from SLM 10.19 to SLM 14.87~|~05 - 4R Maintenance - Resurfacing~|~9BB65E3F637F5B1BF2628523AC25E3694C21AE7D 95755~|~1~|~2~|~02/SAF~|~Center Line Rumble Stripe Plan split - OTT - SR 2 - 10.34 to 14.87~|~21 - Safety~|~E8A10FFCA1979E3200A8957F37FB723639E9C50E 126412~|~1~|~1~|~01/ENH~|~Resurfacing Sippo Valley Trail from Village of Dalton to Stark County line. ~|~28 - Facilities for Pedestrians & Bicycles~|~1B173BCC1A14EB66B931320B0D4434FF4C5E52FF 84746~|~1~|~2~|~02/NHS~|~Crack Sealing NHS Routes ASD-030-03.82 - 13.32 / HUR-020-16.84 - 28.69~|~44 - Other~|~0096CD267CEB2452136BCF0EE14821E85D71554B 84746~|~1~|~1~|~01/STR~|~Crack Sealing ASD-042-09.39 - 19.35~|~44 - Other~|~21012CC6AABBA1578581915EF21FB2F112C9A142 124866~|~1~|~1~|~01/NFP~|~Sign replacements on various routes throughout District 4.~|~21 - Safety~|~578916EC561A1D9CAACC820AAD70CCC0CCFCF3B9 101363~|~1~|~2~|~02/SAF~|~Shoulder widening along NOB 78 0.00-6.84 using Safety funds.~|~21 - Safety~|~99C7BA15B9F74EFCDAD1EA4EE7522905B76FD409 101363~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. NOB 78 0.00-7.56 and NOB 821 7.47-8.30, 8.63-13.22. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~66264E4175F224F2BC1F01626C817DF4C35A7EC0 106821~|~1~|~1~|~01/BRO~|~Rehabilitate bridge (CAR-9-2165 SFN 1000136) by replacing deck edges, providing new rigid overlay and encasing piles.~|~13 - Bridge Rehabilitation~|~C88E02B1A33306B0D463B803725E47FDB97AD604 121066~|~1~|~1~|~01/NFP~|~bridge rehabilitation~|~13 - Bridge Rehabilitation~|~90F766D7C812BEA143BF32130285E1EC5442EB73 78190~|~1~|~1~|~01/ENH~|~Construction of the Meigs Middleport shared use trail. An STP earmark project. Funded 80 federal/20 local.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~D1EB7CC3DC7859F0078E8DCA48DD8C5D2D1E3122 123561~|~1~|~2~|~02/NHS~|~Plan split for the NHS work locations~|~21 - Safety~|~3C2E0FE30EAF1356F77B74453D4F4FCCE2ED5D34 123561~|~1~|~3~|~03/S>2~|~Plan split for the Large Urban locations~|~21 - Safety~|~9D1B481108958931557C8A34D24DA4014075AAC5 123561~|~1~|~1~|~01/IMS~|~Plan split for the interstate locations~|~21 - Safety~|~FFA26374388F44AB21733A3BE3DA2437EA6261E8 116635~|~1~|~1~|~01/NFP~|~Sign Replacement.~|~21 - Safety~|~1D4A3D338D5E3F67D0BD078B65936CAA02157392 110030~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 78 11.38. Funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B34E0FFFFDB176253EA24625242F1675349CD8F 115390~|~1~|~1~|~01/NFA~|~Bridge replacement project. MRG CR 52 3.82, SFN 5834449.~|~10 - Bridge Replacement~|~9FF4423E8611BCC08C0BEC48AD3D33B5565F3114 119451~|~1~|~1~|~01/NFA~|~Install new guardrail along MRG CR 7, 13, 45, 59, 60, 66, 92 and bridge terminal assemblies. Funded 100% Federal.~|~21 - Safety~|~11FE6DC901D86CDF406FFE224FAEE26A3C6E482E 84379~|~1~|~1~|~01/STR~|~General system preventive maintenance; HAS-22 0.00 to 11.73~|~05 - 4R Maintenance - Resurfacing~|~EA25AF8735B3544D990D65305D7E9F86D033A286 97816~|~1~|~1~|~01/ENH~|~Construct Trail Head Facility including parking, shelter, landscaping; construct bik/ped trail to Beehive Coke Ovens.~|~28 - Facilities for Pedestrians & Bicycles~|~58FF17903EB5ABE640EBFAEB293CB969F4A95DB1 103295~|~1~|~1~|~01/S<2~|~Slide repair within the corp limits of East Liverpool.~|~04 - Reconstruction - No Added Capacity~|~60BD7B978D71D0F0CA52ED2578F9A3CC7CE682D9 96292~|~1~|~1~|~01/STR~|~Deck replacement on SFN 4002857, SLM 12.45~|~13 - Bridge Rehabilitation~|~0C02789805B9DDBEBD26387105A497A83FBF5905 106823~|~1~|~1~|~01/BRO~|~Rehabilitate existing box beam superstructure on bridge CAR-39-0220 (SFN 1000241) by replacing fascia box beams, the waterproofing and asphalt wearing surface.~|~13 - Bridge Rehabilitation~|~B6D6894C44F8CC581FD8C457DB30D5FB2B93AF27 85198~|~1~|~1~|~01/SAF~|~Construction of roundabout at the intersection of State Route 619 and McCallum Road (CR19) in the City of Alliance, Stark County, Ohio.~|~21 - Safety~|~3C863DDFE893F38ABA30C1E93A4E6F509336D73F 85198~|~1~|~2~|~02/STR~|~Replacing 3 culverts.~|~04 - Reconstruction - No Added Capacity~|~AB31D2FAD7B8443472E1DC3E3C572122B5EDDFCA 117529~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~DCD10EF56AECCEDFB1ADC78BA8E4E7CF9F7648D6 116991~|~1~|~1~|~01/IMS~|~Plan Split for the interstate location~|~05 - 4R Maintenance - Resurfacing~|~55003AB4831E220C902ECB5B7B9CE579B0D4439B 97291~|~1~|~2~|~02/NHS~|~Split for work on the NHS~|~44 - Other~|~5531D34CEFE290CBE75BA4BB8D2F2FE8023509DE 97291~|~1~|~1~|~01/IMS~|~Split for work on the interstate system.~|~44 - Other~|~8FCC14ECF658D396FC1D22DB86F8AA17F5B95A3D 97291~|~1~|~3~|~03/S>2~|~Split for urban STP routes~|~44 - Other~|~D885C76824C91977FFBD45D440A8B3A0488D97E3 97291~|~1~|~4~|~04/STR~|~Split for rural STP routes~|~44 - Other~|~A5EB67246B7EEE957C09D074A171E7B6B8703123 123165~|~1~|~1~|~01/ENH~|~Continued upgrade of pedestrian connectivity in Village Of Racine.~|~~|~4B99E3B6E8A9FCBB4C9CAFF8CF407A0617395B27 104487~|~1~|~2~|~02/SAE~|~Safety related items - overhead signs, backplates and countdown ped. heads.~|~21 - Safety~|~8ECC39B3B18E7464113D81BC0EAC6B77D736F697 104487~|~1~|~1~|~01/MPO~|~Non-Safety related items plan split~|~05 - 4R Maintenance - Resurfacing~|~26577107475DD181654D4FA29AE943D29D2E0C41 88998~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~10B510831EC2C1A4B3D5F2E3C7F5C8462CA5BF8A 118901~|~1~|~1~|~01/STR~|~Resurfacing SR 754 from SR 39 to SLM 0.96~|~05 - 4R Maintenance - Resurfacing~|~7DB0B076241C74488F59FAD875D26CA123E30D20 118901~|~1~|~2~|~02/NFA~|~Resurfacing SR 754 from SLM 0.96 to SR 514~|~05 - 4R Maintenance - Resurfacing~|~8CD545CE8D6A30CB4626397601743780D8456BF3 99663~|~1~|~1~|~01/STR~|~SEN-12 @ 4.0~|~~|~A75E7880A0A3194F19C5EF9DA97A021382434CEB 84574~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 550 10.56-19.26. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~0F47359C170CA441F1EF73D48DC04695872CF607 84574~|~1~|~2~|~02/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 550 19.26-21.75 and 21.83-21.86. NHS route. Federal 80% and State 20% funding.~|~05 - 4R Maintenance - Resurfacing~|~BE47A4C9DC76F32FE1C56A6F1A63EC65B8CD3980 117931~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~~|~3F6A7CDC66D1A073179315282D6F430632BA5D74 108388~|~1~|~1~|~01/NFA~|~The VILLAGE will repair CR3 and any damaged storm sewers following the installation of a 24? water line running from US224 north to the Village of Leipsic reservoir~|~01 - New Construction~|~86FC90BFB347DE3C3B086A1692DC3159A984A88B 116750~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~240AA148F295CBF2E4BBC942D25F2D5F7D390E13 95541~|~1~|~1~|~01/STR~|~General System Resurfacing including pavement repairs and pavement marking on HAS-342, HAS-800 and TUS-342.~|~05 - 4R Maintenance - Resurfacing~|~3F85E87C066BB9CB10D3F081F7934B5C19B832BB 95541~|~2~|~2~|~02/STR~|~Work involving pavement repairs in the Village of Freeport and funded entirely by the Village of Freeport.~|~05 - 4R Maintenance - Resurfacing~|~4A5C1AF27933BEF772B3C8C01575F47C1DC0756C 112362~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~AAB1274C4936E56747D959B4DB9B6E6BE6CB809D 126741~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding. ~|~~|~49C85807058752DAA99790991BDD7F39DDDEACAD 90849~|~1~|~2~|~02/STR~|~This split is for work outside the Lima Urbanized Area and will use rural STP funds. It covers the section of SR 309 from 0.00 to the Lima Urbanized Boundary at Wapak Road which is at 5.60.~|~05 - 4R Maintenance - Resurfacing~|~9458D6A6BEFB7D5AA2B86E6F4422422E62ABBC70 90849~|~1~|~4~|~04/NHS~|~Work that is is the responsibility of the District to pay for. It covers work on SR 309 starting at the Lima Urbanized Boundary at Wapak Road which is at 5.60 and going to the east to the end of the project. No local funds. Federal NHS funds.~|~05 - 4R Maintenance - Resurfacing~|~5FD63D6CD9ECC7BBF666BDA527D4B84172483D11 90849~|~1~|~5~|~05/CMQ~|~This is for the costs associated with the construction of sidewalks. Work is along SR 309 from Pioneer Road at SLM 7.17 to Eastown Road at SLM 8.67. MPO-CMAQ funds will be used here. The MPO has approved the use of Toll Credit with those MPO-CMAQ funds. Funds over the CMAQ cap will be from the District Preservation Program budget. In return for the MPO-CMAQ funds in this Plan Split, the District will provide in District Preservation Program funds to be used in the MPO Plan Split. The CMAQ eligibility was approved April 8, 2015.~|~28 - Facilities for Pedestrians & Bicycles~|~2F8C4473D8D5831F4A05DAC10837138A2D19AE49 90849~|~2~|~6~|~06/SAF/ELID~|~Funding from the Safe Routes to School program. Work along Pioneer Road (TR 102) from 0.00 to 0.38 and along Sunnydale Road (TR 104) from 0.00 to 0.10. 100% federal funds with Toll Revenue Credit until cap is reached. The amount over the SRTS is the responsibly of the Village of Elida. The work in this split was designed under ALL SRTS Elida Sidewalks, PID 90954.~|~28 - Facilities for Pedestrians & Bicycles~|~861A13A8647638401E6BC21EE7A108233BE5E2D7 90849~|~1~|~3~|~03/STR~|~Plan split for 80% federal and 20% state funded culvert work District Preservation Program Funds SACs 4PF7 and 4PS7. Work to replace a culvert near SLM 0.60 on SR 309.~|~44 - Other~|~B8303BFD27550419AD4EFBD44F81E9D7BDA188F6 90849~|~1~|~1~|~01/MPO/ELID~|~This split is for curb, gutter and drainage work that will be the responsibility of the Village of Elida to pay for. The work is along SR 309 between SLM 6.10 and Pioneer Road at SLM 7.17. All work in this split is in the Village of Elida. The District will provide District Preservation Program funds SACs 4PF7 and SAC 4PS7 for this split in return for the MPO-CMAQ funds in the CMAQ Plan Split. The MPO will provide MPO-STP funds for this Plan Split. The MPO has agreed to provide Toll Credit for use with the MPO-STP funds. Funds needed after the District and MPO funds are used will be provided by the Village of Elida. Paving work paid with District Preservation Program funds is in other splits.~|~04 - Reconstruction - No Added Capacity~|~7B291BBA46AF11CBF79FBC7E9CD7AED44D5A215C 105749~|~1~|~1~|~01/NFP~|~Districtwide Systematic Sign Replacement~|~21 - Safety~|~ED871D9159D0DBD23EF970BBF12F51AB1BDB2386 94221~|~1~|~1~|~01/NHS~|~Bridge inspection on NHS bridges~|~~|~9416F7AA4BC66866DDF1B865E82EC49E917C49BC 94221~|~1~|~2~|~02/IMS~|~Bridge inspection on IR bridges.~|~~|~7C22745F407EC2C0E598CC9BB358F31B10635D90 117583~|~1~|~1~|~01/MPO~|~Plan split for TLCI funded eligible work for sidewalk installation.~|~28 - Facilities for Pedestrians & Bicycles~|~4C4D6A0A74024977286CBF8D4F00721D1A5ABA83 96060~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Plan Split for construction of Sanitary Sewer Line form D-05 Complex to newly installed Licking County Sanitary Sewer System.~|~44 - Other~|~268FB9B3EF6AD3BA2A7DEB16968770EE5D9B9CC5 107674~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 from the beginning of the project until the Delphos Urban Boundary at 10.13 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~3E5FF2BD1FCEFB2599725250CEF2C8FCE16F661F 107674~|~1~|~2~|~02/S5K~|~Resurfacing on SR 66 from the Delphos Urban Boundary at 10.13 until the end of the project using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~DC5FE6D7C359999C0289B5E56B013A7522B8E926 83545~|~1~|~1~|~01/NFA~|~Superstructure replacement project. Existing piers to be evaluated for use with new superstructure. HOC CR 33A 1.00, SFN 3730328. CEAO funded project. Federal 80%/Local 20%.~|~10 - Bridge Replacement~|~6D36EE4D43050977358C9799CBFA46E1A74DF801 124046~|~1~|~1~|~01/NFP~|~Plan split for pavement markings on various routes throughout District 12~|~21 - Safety~|~0E7368747BE4E765D9FA028D49CA9F189DE7A070 102547~|~1~|~1~|~01/NHS~|~Plan Split for the NHS portion of HAM US 52~|~99 - State Preventative Maintenance~|~2BDD1F0AA73D0FEFDD13E05146BAC9D1846CB960 94387~|~1~|~1~|~01/STR~|~General System Resurfacing - Rural~|~05 - 4R Maintenance - Resurfacing~|~1A14537A87CE3F9DE65F64B515CB61D0DFA1F15A 94387~|~1~|~2~|~02/STR~|~ERI-113-14.06 SFN: 2203006Bridge Work~|~47 - Bridge Preventive Maintenance~|~914119285FB17DA1A7E41AD43AAC4A0F348C3D65 108463~|~1~|~1~|~01/STR~|~PIK CR 50 3.40 ER repair~|~04 - Reconstruction - No Added Capacity~|~A1372F7652D67FAAC710D71AB40985077C5CA0A6 98477~|~1~|~1~|~01/STR~|~LOR-162-0.00-8.79 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1F6050E8EE3A4AB8831F9CED919986035E1A33EC 110370~|~1~|~2~|~02/STR~|~CEAO resurfacing funds plans split for Rural section~|~05 - 4R Maintenance - Resurfacing~|~07EECC48CC06FCBACC8779D1B30133C294E23DA7 110370~|~1~|~1~|~01/S5K~|~CEAO resurfacing plans split for Urban sections; CR304 from 1.35 to 1.76; and on CR309 from 7.54 to 8.6.~|~05 - 4R Maintenance - Resurfacing~|~222AEC271D922339D6FEA1DEDD5C6D0FFB1F281D 114293~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8.~|~21 - Safety~|~05A875D50DF08FDEAA8471AD2F7846432F68613A 97858~|~1~|~1~|~01/NHS~|~Resurfacing along SR 16 and SR 79. Minor bridge maintenance on SR 16 and SR 79.~|~05 - 4R Maintenance - Resurfacing~|~F4133EF82E265B41B6189915583D9F9C5C53D62F 117559~|~1~|~1~|~01/ENH~|~SRTS eligible work~|~28 - Facilities for Pedestrians & Bicycles~|~CAE06333AFB97149F422E79A99BB41232A056266 116041~|~1~|~1~|~01/NFA~|~Culvert replacement project. NOB 146 1.95, CFN 1838570. Not on the federal aid system. ~|~04 - Reconstruction - No Added Capacity~|~B8AE8A51AFC0E0C640E96DB2F25693848796F968 98917~|~1~|~1~|~01/NHS~|~Repair impact damage to the MOT-35-1344 (SFN 5701589) girders above the Eastbound outside lane.~|~13 - Bridge Rehabilitation~|~8CC924283BDFB177C6F71841BBA9AE761C45D1C2 87611~|~1~|~2~|~02/S<2~|~"02/S<2/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the OFAH-Urban Routes~|~21 - Safety~|~CB34E8D6B4879818A23782CD9548821F35CC7E53 87611~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the NHS System~|~21 - Safety~|~E83CFA8837526BEEA6E26862687A9AD805303499 87611~|~1~|~3~|~03/STR~|~"03/STR/OT/ " - District Preservation - 4PF7 (80% Federal) / 4PS7 (20% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the OFAH-Rural Routes~|~21 - Safety~|~AD8EBC1EC0074815BA1E60AD6573BD7D5C86ECA4 87611~|~1~|~4~|~04/IMS~|~"04/IMS/OT/ " - District Preservation - 4PF7 (90% Federal) / 4PS7 (10% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the Interstate Routes~|~21 - Safety~|~57E0CEC5966B06169CACB20F6B542289CA99A8FF 87611~|~1~|~5~|~05/NFA~|~"05/NFA/OT/ " - District Preservation - 4PS7 (100% State) - Annual contract for placement of Spray Thermo Striping within District 5 on the NOFAS-Rural Routes~|~21 - Safety~|~84D0C10C25397A1F53B3476D16C65E68B0F74BD7 113773~|~1~|~1~|~01/NFP~|~Construction of a concrete pad approximately 20,000 SF. 50% Maritime Assistance Program 50% local funds.~|~44 - Other~|~3010E70B09B4C66F789D2BB05501AA9E627A3FF9 96121~|~1~|~1~|~01/IMS~|~Replace headwall and repair erosion on culvert at FRA-670-0.31~|~04 - Reconstruction - No Added Capacity~|~FA62837CB038A88EEE4945E9DBC868330BB6DE9B 108804~|~1~|~1~|~01/IMS~|~Four-Lane resurfacing project. Work includes asphalt mill/fill, guardrail replacement and shoulder rehabilitation. WAS IR 77 0.00-6.63. 90% Federal and 10% State funds.~|~05 - 4R Maintenance - Resurfacing~|~345793434ED3A8A228D5779F25CA9C074202AE76 108804~|~1~|~2~|~02/IMS~|~Replace the standard thermoplastic pavement marking with thermoplastic pavement markings containing wet reflective elements installed into a groove in the pavement. Change Order.~|~05 - 4R Maintenance - Resurfacing~|~AE8402A82BB5A60E4A266372DF0F3A02661457B5 89197~|~1~|~1~|~01/S>2~|~80/20 funding split using State District Preservation funding~|~05 - 4R Maintenance - Resurfacing~|~10EC7D8071079EC5996D7A90853F94A1BF1E5752 89197~|~1~|~2~|~02/S>2~|~100% local participation only~|~05 - 4R Maintenance - Resurfacing~|~58CD18BDE50537DD2F344DA3877AC0D09E8BCF6C 125271~|~1~|~1~|~01/BRF~|~Replace Bridge on CR 117 (Lewis Rd) over Spring Fork.~|~10 - Bridge Replacement~|~CA8651C2753C44E76DB8B810764C4CD81B3A5F02 107978~|~1~|~1~|~01/NHS~|~Urban paving resurfacing~|~05 - 4R Maintenance - Resurfacing~|~EAB589FD3CB4C0BCF337A375488E4181CDA4F4ED 81749~|~1~|~1~|~01/IMS~|~Unfunded 270 North Project G270/315 interchange~|~03 - Reconstruction - Added Capacity~|~9B612290276AFDE57B19F0F75E91EDB5975D3F9D 83307~|~1~|~1~|~01/ENH~|~BRO CR62 0.08-0.19 Ripley Main St Street ScapeTE project. Street Scape. 80/20 split with local match by Ripley. 01/ENH/OT/Ripley~|~31 - Landscaping & Other Scenic Beautification~|~FD7F43957DDE2FCD064CC4CC5AC6E14D63C30B5B 124594~|~1~|~1~|~01/SAF~|~Sidewalk and road diet along Duck Creek Rd. ~|~21 - Safety~|~0EB9D500B6B6E0503BD7B21D4AC8639BF9FEDF30 97159~|~1~|~1~|~01/S>2~|~Guardrail replacment on various routes throughout Stark County.~|~21 - Safety~|~427F31D07BF6C626D2E9B80E26F51E12A6B73376 94467~|~1~|~2~|~02/S<2~|~Preventive Maintenance Crack Sealing: RIC-42-2.80-3.06~|~99 - State Preventative Maintenance~|~73AA52DF8862E1F0D98E2FD4C326059AFD766C13 94467~|~1~|~3~|~03/S>2~|~Preventive Maintenance Crack Sealing: MED-3-8.03-9.86~|~99 - State Preventative Maintenance~|~0AF8F49F90539020B6663405228F3649A72DF702 94467~|~1~|~4~|~04/NHS~|~Preventive Maintenance Crack Sealing: ASD-224-11.55-13.71 / RIC-42-3.06-3.48 / MED-42-3.06-6.91 / MED-224-10.45-16.36~|~99 - State Preventative Maintenance~|~58F6BD3124588D7097BF499AC9DCA7806BDC8793 94467~|~1~|~1~|~01/STR~|~Preventive Maintenance Crack Sealing: ERI-113-9.64-11.60 / MED-3-6.98-8.03 / MED-3-18.03-19.84 / MED-57-18.69-20.67 / RIC-13-21.69-32.63 / RIC-42-0.00-2.80 / MED-42-2.79-3.06~|~99 - State Preventative Maintenance~|~87B061F83EC6B5A1318C2F8387146B3BBA0C1708 94467~|~1~|~5~|~05/IMS~|~Preventive Maintenance Crack Sealing: LOR-90-11.90-18.61~|~99 - State Preventative Maintenance~|~AFA882F1C10B2A181ABCEF6E897AE99F7E751009 104674~|~1~|~1~|~01/IMS~|~This plan split covers all roadway work that adds capacity. This includes all of the 670/270/62 interchange work, except the structures.~|~21 - Safety~|~ADB5861E0C667F5C82BA36E116B48FA61441064B 104674~|~2~|~6~|~06/IMS~|~Part 2 pavement resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4D111942164A11B2A058AA1CB9180C171D8D08FE 104674~|~2~|~7~|~07/IMS~|~Part 2 bridge preservation work~|~13 - Bridge Rehabilitation~|~AE6B573CA4D9D3DAA7AEF950E7F2C1ECADD27685 104674~|~1~|~5~|~05/IMS~|~This plan split covers the ITS work for the project, and is categorized as adding capacity. This includes overhead gantries, comms lines, and cameras.~|~44 - Other~|~A12F56533285834ED571333863CABDF500C434B7 104674~|~1~|~2~|~02/IMS~|~This plan split is to address the resurfacing of IR 670 with the project, funded by District preservation.~|~05 - 4R Maintenance - Resurfacing~|~8291E51935B79C46E341049E218964B8C6E19A77 104674~|~1~|~4~|~04/IMS~|~This plan split covers all preservation work on structures (does not add capacity). This includes sealing of the existing structures.~|~13 - Bridge Rehabilitation~|~B23D0E96A82C2C23FFC81AA81B36313BF9EED7F6 104674~|~1~|~8~|~08/NHS~|~New structures FRA-62-2216 (Ramp M over US 62) and FRA-62-2226 (Ramp M over Ramp N)~|~08 - Bridge - New Construction~|~F80CCC02A179E7C215830F0578616FDC15718A87 104674~|~1~|~3~|~03/IMS~|~Widening US62/IR 270EB structure over IR 270~|~13 - Bridge Rehabilitation~|~C145C1BED5FE8164A9F2434A2C558C8EFC0C7AD1 104674~|~1~|~9~|~09/SAF~|~Payment of law enforcement officers to monitor operation of Smart Lane when it is put into operation~|~21 - Safety~|~BF659EE153E7474815436A35BEE6C698547BC6F0 104674~|~1~|~10~|~10/IMS~|~Repair damage caused by vehicle accidents.~|~05 - 4R Maintenance - Resurfacing~|~A021DF5ED59DBECCE618E1CFBA0454B126AD0FC1 97620~|~1~|~1~|~01/NHS~|~Resurfacing TRU-SR 11SB from 3.74 to 7.68 and TRU-SR 11NB from 3.86 to 7.68.~|~05 - 4R Maintenance - Resurfacing~|~298952DE5503CCD07D53C74B7BF806D8E4228276 97620~|~1~|~2~|~02/NHS~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~3A81DFE5BBA9455AD9AED11DEE325E43F9984C0A 97620~|~1~|~3~|~03/NHS~|~See linked structure 10' to 20' span.~|~13 - Bridge Rehabilitation~|~E5FCCEF3B50524299DEEF39CC4A39B9D57D7C593 100756~|~1~|~1~|~01/MPO~|~Public art investment along GCRTA's Red Line transit line eligible for MPO funding.~|~~|~94C3143561EAC9F2DD4335AE42E35ACD7E0E33F2 95658~|~1~|~1~|~01/S>2~|~Demolition of buildings on 7 parcels.~|~44 - Other~|~F447864DDCD8512C2D4355481B3BEBE88BA6A75C 102322~|~1~|~1~|~01/NFA~|~Replace Superstructure on County Road.~|~13 - Bridge Rehabilitation~|~356834444DDCB68B192BAE7B9387D734ED469F2E 93122~|~1~|~1~|~01/STR~|~STP Rural (District Allocation) Resurfacing: RIC-314-0.00-1.76, RIC-314-5.22-9.49~|~05 - 4R Maintenance - Resurfacing~|~131075A4E229E0B49CE1327F1256F8FD23E48548 93122~|~1~|~4~|~04/S<2~|~STP<200,000 (District Allocation) Resurfacing outside City Limits: RIC -314-1.76-3.02, RIC-314-3.02-5.22 LT, RIC-314-9.49-10.01~|~05 - 4R Maintenance - Resurfacing~|~81E211C29A964EADDD9C856A7149D5D1D4C0F3CC 93122~|~1~|~2~|~02/S<2~|~STP<200,000 (80% District Allocation/ 20% Local) Resurfacing within Ontario City Limits: RIC-314-3.02-5.22 RT~|~05 - 4R Maintenance - Resurfacing~|~87502144AE10C7F749227DF907D747B3581256E9 93122~|~1~|~3~|~03/S<2/ONT~|~City of Ontario Costs within City Limits (SLM 3.02-5.22 RT)~|~05 - 4R Maintenance - Resurfacing~|~D706FBE0132A34F4D741276C8D48137F579C3472 93122~|~1~|~5~|~05/NHS~|~Bridge workSFN: 7006012 (RIC-30-4.26)~|~47 - Bridge Preventive Maintenance~|~DF410F3269FFA7871C4321C3ABA50B1D5DA9C68B 90942~|~1~|~1~|~01/IMS~|~Bridge Replacement (90/10 Fed/State 4PS7/4PF7): SFN 4704894 and SFN 4704924~|~04 - Reconstruction - No Added Capacity~|~7826AC4CBC37B3357E210A6ED7DB6924BD1B2D56 90942~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~0DC75639D1E70C4B3803F77D8BC40979451A0760 114767~|~1~|~1~|~01/NHS~|~PIK 32 Double micro~|~05 - 4R Maintenance - Resurfacing~|~9EC612B8071B507B34A3894A834C859B286ADDCB 114767~|~1~|~2~|~02/NHS~|~Bridge maintenance work.~|~47 - Bridge Preventive Maintenance~|~B23383E4CCCF8A4DA9C172DFEF626BDFA654E343 88601~|~1~|~1~|~01/STR~|~Replace slab bridge over Norton Run SFN 2102676 DEL 229-0.20~|~10 - Bridge Replacement~|~2EE1B3E5FF7F217CC23115033012A547A30F5461 122953~|~1~|~1~|~01/S5K~|~Resurfacing and other improvements to East 5th Street in the City of Marysville.~|~04 - Reconstruction - No Added Capacity~|~62EE5BF1ED12C75817B781F66C78378BD382F87A 86702~|~1~|~1~|~01/BRO~|~Brdg Replacement. 4401204 LAW SR7 0.27 Intersect: Buffalo Creek0.27 mile north of US52. 80 Fed/20 State. 01/BRO/BR/State~|~13 - Bridge Rehabilitation~|~706F486773DF5CBA0619956D6FAFC0EACE0338AE 111577~|~1~|~1~|~01/BRF/NEWL~|~Village of New Lexington Municipal Bridge Funding - 4R87 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments ? Replacement of SFN 6460607 carrying Nuzum Street over Rush Creek in the Village of New Lexington. BR Eligible L=43; SD/FO = 1; DSR = 4; SR =19.6;~|~10 - Bridge Replacement~|~8653A0307D68EBFAD4EF9A99946AA6BC9C5C71B9 117574~|~1~|~1~|~01/NFA~|~Structure replacement - complete replacement of existing 49-foot structure, including abutments and approach work.~|~10 - Bridge Replacement~|~2B828B1D8CC9CBB145C9458F450FA68F0D1C162F 84070~|~1~|~1~|~01/STR~|~Culvert @ SLM 11.51~|~04 - Reconstruction - No Added Capacity~|~C8D6752A8AD77D8771D8F5DE115944832C5C3B9C 123190~|~1~|~3~|~03/S5K~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~4F8EADADF9A096FE8FAB1DADB161CCF0E4324A18 123190~|~1~|~4~|~04/STR~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~974874971FB79C10EB38505473F758E498C2E1D0 123190~|~1~|~1~|~01/NHS~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~EA728F9BB52E0C6263145647FBCE0A6BBB6C30C7 123190~|~1~|~2~|~02/S>2~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~6BA16B96E6925CABAAF1497E0C8E23ADB47C718C 101900~|~1~|~1~|~01/ENH~|~Rehabilitation of the Hocking Valley Scenic RR. Federal TAP funds at 80% rate, 15% of TRC and 5% local. Final funding is 95% Federal and 5% Local.~|~22 - Rail/Highway crossing~|~213607845B9C6371930013DEA1EF6CDA73CC391B 100048~|~1~|~1~|~01/NHS~|~Remove and replace 24" storm sewer pipe on the west side of SR 48~|~44 - Other~|~BCF03A70872568F46965C00AE61D3EEC832DC18D 94732~|~1~|~1~|~01/IMS~|~New ramps~|~01 - New Construction~|~D8C20CC4418F6A0E1EDDC02A836430A7E7CC8406 94732~|~1~|~2~|~02/IMS~|~SFNs: 4801016, 4801040 new bridgesSFN: 4807863 widen existing bridge.~|~01 - New Construction~|~F6B4773A18430A990902EC6C1A6925E3E2F7CF3C 84666~|~1~|~1~|~01/S<2~|~Urban paving~|~05 - 4R Maintenance - Resurfacing~|~8454E9FBF0E406179C7A1FD4BB861556E70732A6 84666~|~1~|~2~|~02/S<2/BUC~|~100% City of Bucyrus items~|~05 - 4R Maintenance - Resurfacing~|~136667D0AC5A1E363AA07C67879C7EC8D64569E4 84666~|~1~|~3~|~03/S<2~|~S<2 segment outside CIty Limits~|~05 - 4R Maintenance - Resurfacing~|~EC63F006DED69AFAB4D0AA53FEC537D47EEBD87E 84666~|~1~|~4~|~04/S<2~|~100% state items~|~~|~221EC22AEF1FE29129F5FB978BB5520C058F3677 87188~|~1~|~2~|~02/NHS/LIMA~|~This split is for resurfacing work inside the City of Lima. The City of Lima will provide the 20% non-federal match. The District will provide the federal funds from the District Preservation Program SAC 4PF7. The split covers all pavement work on SR 65 from the beginning of the project to Northern Avenue at 8.98. It also covers work along the west side of SR 65 from Northern Avenue at 8.98 to Brower Road at 9.35 and the east side of SR 65 from Chapman Road at 9.27 to the coporation limits at 11.10.~|~05 - 4R Maintenance - Resurfacing~|~1578E25A98EB3E7D5601DE66DD440327F7067A7E 87188~|~1~|~4~|~04/S<2~|~Resurfacing of SR 81 in Allen County from Wapak Road at 11.34 to Eastown Road at 13.47. Work is inside the Lima Urbanized Area but outside of the City of Lima. All funds are from the District Preservation Program Funds budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~9E04F0AB7104CBB9C85AEBB782E4A1FF2212272C 87188~|~1~|~1~|~01/NHS~|~This is for work outside the City of Lima but inside the Lima Urbanized Area. It covers work along the east side of SR 65 from Northern Ave. at 8.98 to Chapman Road at 9.27. It also covers work along the west side of SR 65 from Brower Road at 9.35 to the end of the project. It covers all work north of the corportation limits at 11.10 on both sides of the road. All funds in this split are from the District Preservation Program budget 80% 4PF7 and 20% 4PS7. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~531C1F1F1E9AF71D7C0C126A0F826028A01DC208 87188~|~1~|~3~|~03/MPO/LIMA~|~Funds provided by the City of Lima and the Lima MPO. MPO-STP funds can be used at a 100% rate. The use of Toll Credit has been approved. Funds needed over the MPO-STP cap are to be provided by the City of Lima. Covers non-resurfacing work such as curb & gutter, drainage and auxilary pavement markings inside the City of Lima, including along the City of Lima side of the road where the coprporation limits split the road. Covers non-resurfacing work on both sides of SR 65 from the begining of the project to Northern Avenue at 8.98. It also covers non-resurfacing work along the west side of SR 65 from Northern Avenue at 8.98 to Brower Road at 9.35 and the east side of SR 65 from Chapman Road at 9.27 to the corporation limits at 11.10. All the discussed sections of SR 65 in this split are on the NHS.~|~44 - Other~|~FF99EC671F7C3C9176ADE7EBD2D7BB844700EF30 87188~|~1~|~6~|~06/CMQ~|~This is for sidewalks along SR 65 outside the City of Lima but inside of the Lima Urbanized Area. Funds provided by ODOT District 1 and the Lima MPO. The MPO-CMAQ funds can be used at 100%. The use of Toll Credit has been approved. Funds needed over the cap will be from the ODOT District 1 Preservation Program budget. All of SR 65 in this split is on the NHS. The sidewalks are north of Brower Road along the west side of SR 65.~|~28 - Facilities for Pedestrians & Bicycles~|~4F971C76576DAAE47E20A28D966088CF4DF6B429 87188~|~1~|~5~|~05/CMQ/LIMA~|~This is for sidewalks inside the City of Lima along SR 65. Funds provided by the City of Lima and the Lima MPO. The MPO-CMAQ funds can be used at a 100% rate. The use of Toll Credit has been approved. Funds needed over the cap will MPO-STP funds no used in other events. Additional funds needed after all federal funds are used are to be provided by the City of Lima. All of SR 65 in this split is on the NHS.~|~28 - Facilities for Pedestrians & Bicycles~|~D986CE09ADAC458F941F919066FE9A9FB239CCDF 102067~|~1~|~1~|~01/NFP~|~Various CR and TR.~|~05 - 4R Maintenance - Resurfacing~|~3F1822EB70647699341967A414669DFB6CA000B3 105174~|~1~|~1~|~01/STR~|~AC Overlay without repairs on rural route: LOC SR 347 SLM 3.63 to 5.73.~|~05 - 4R Maintenance - Resurfacing~|~EF6B25D5783EC321A92D3D64A041CB457999F213 106278~|~1~|~1~|~01/NFP~|~Replacing guardrail on various routes throughout District 4.~|~21 - Safety~|~18D5F06871767F3F82F6BE6DC90C01338EBFFC9D 98826~|~1~|~1~|~01/BRO/MTVE~|~City of Mount Vernon Municipal Bridge Funds - 4R87 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of SFN 4232712 carrying CR 503 over the Kokosing River.~|~10 - Bridge Replacement~|~78955BAB9C551A2DD2C8900D28898C7171D2460F 98826~|~1~|~2~|~02/ENH/MTVE~|~City of Mount Vernon Transportation Alternatives Funding - 4B37 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Providing Multi-Trail connectivity from existing trails to the structure replacing SFN 4232712 carrying CR 503 over the Kokosing River.~|~10 - Bridge Replacement~|~10F4B9790358EFC59BDF39081AE40848B884ABDB 96919~|~1~|~1~|~01/SAE~|~Pavement Marking~|~21 - Safety~|~34C5A7E18520A8F6CD7B7B171A8B14A179B9F427 87327~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 20.36-22.15, includes Gallipolis Village. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~8F15AA67FED27C4F1DED8302C48129A1589EEE84 87327~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 16.03-20.36. Also includes asphalt overlay on deck of bridge GAL 141 1373, SFN 2701715. Rural other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~DAB5C8EB1AEDD55D42E9B30A207318FD3F9781DB 83630~|~1~|~2~|~02/NHS~|~80/20 fed/state funding split for all work from US-422 to Washington St (old 422), SLM 2.57 to SLM 2.81, using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~5A0F9691AF252D82D19341FA103DF61BF369C48F 83630~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work from the county line to US-422, SLM 0.00 to SLM 2.57, using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~A5A55ECD3CCDD5D57E5FD6537FB0E94A4301D44F 121067~|~1~|~1~|~01/CMQ/MACE~|~Intersection improvements on Highland Rd at SR 8 and S Bedford Rd.~|~04 - Reconstruction - No Added Capacity~|~A57C615AB1420B197217555F653ACC1FB6E14479 93626~|~1~|~1~|~01/STR~|~State and federal funds from the District Preservation Program budget. No local funds. Rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~F67CAF9A2E04BAFA589F471187ED41EB8B80D1D2 126748~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~~|~E3406E90EA8B96EA175E738540AEB3DA0D859E95 101868~|~1~|~1~|~01/NFA~|~LAW CR 410 / TR 1012 intersection improvement.~|~21 - Safety~|~2EC6D1744223066046FA5A900BE20FA5447EF09C 116146~|~1~|~1~|~01/BRF/AKRO~|~Deck and approach slab replacement.~|~13 - Bridge Rehabilitation~|~DB292AD566CC0BFD88A3650EAC86B61189ABFC4E 81638~|~1~|~3~|~03/NHS~|~Plan Split covering pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~0B3D9A6B98D2F0101610835A63AC5EFD8E5EADCC 81638~|~1~|~5~|~05/S>2~|~SFN 5000572 & 5000602 MAH SR 11 10.10 L & R over US 62.~|~13 - Bridge Rehabilitation~|~0CF0E0EFEE2C7BB07CEB19DACB48A799C73D165E 81638~|~1~|~1~|~01/NHS~|~Plan Split for Paving MAH SR 11 from 0.00 to 8.46~|~05 - 4R Maintenance - Resurfacing~|~21B72E197F4DB3202903B1E59EE1166FFF9EA0E9 81638~|~1~|~4~|~04/IMS~|~SFN 5029430 MAH-SR 11-9.39 over Ohio Turnpike.~|~13 - Bridge Rehabilitation~|~6B434E3FBF72FAED01EB96D98EDA14306D881533 81638~|~1~|~2~|~02/NHS~|~Plan Split for SFN 5000211 MAH SR 11 01.01 under Garfield Rd, SFN 5000246 MAH SR 11 01.47 under Renkenberger Rd, SFN 5000483 MAH SR 11 07.59 under Leffingwell Rd, SFN 5000726 MAH-SR 11-14.55L over Norquest Blvd, and SFN 5000750 MAH-SR 11-14.55R over Norquest Blvd.~|~13 - Bridge Rehabilitation~|~CB49378EB96D0897D8B290B16FF609682367FD6B 126739~|~1~|~1~|~01/S5K~|~Rehabilitation of bridge (SFN 2300338) over Pleasant Run on US 22 (E Main Street) in Fairfield County.~|~13 - Bridge Rehabilitation~|~575957C219F23097577ABF4AB7919B8951AF773C 126568~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay RIC-61-4.353 to 7.644Federal / Local Funds~|~05 - 4R Maintenance - Resurfacing~|~99BDD0BEC085054C14F5891A37277183DF11F203 126568~|~1~|~3~|~03/S5K~|~Asphalt Concrete Repairs, ADA ramps, other 100% Local Funded items~|~05 - 4R Maintenance - Resurfacing~|~E9AC9F07A7AC9FF7CF0BF08F99AF3EFB7F497F47 126568~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with repairs RIC-61-7.644 to 7.646~|~05 - 4R Maintenance - Resurfacing~|~5A00CCDB3009452E19E4A70E5937B8AAE945596A 118660~|~1~|~1~|~01/S5K~|~Repair of MUS-22-11.59 structure (SFN 6000495)~|~13 - Bridge Rehabilitation~|~50C344B421C4CA346C3255D98672CE82E0A288A3 112750~|~1~|~1~|~01/NFP~|~CrackSeal~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B8DAA55E2B0E5263E6512FDAE900C69FDFDB2F59 106722~|~1~|~1~|~01/BRF~|~Rehabilitation of the bridge size culvert (SFN: 8362238) that carries Innovation Way over Union Run.~|~13 - Bridge Rehabilitation~|~8F97DA02B0F17A79ACB90EB161859837D2D6BB09 121083~|~1~|~1~|~01/NFP~|~PM 2023 plan split.~|~21 - Safety~|~B3B0980B3485244EBBAE0B5A32613DDFAF6423D8 121370~|~1~|~1~|~01/NFP~|~FY27 Bridge Holder~|~44 - Other~|~06AC87BADFC314718968539DB60256101C1BBC37 114905~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~05FA709C9BA39971443668DAEDD5BD1A51B3DB12 114905~|~1~|~2~|~02/S>2~|~OTT-51 from SLM 7.90 to 10.385~|~05 - 4R Maintenance - Resurfacing~|~1E8A9CE357FEB692CF4DED69005AC42687D0E5C4 99844~|~1~|~1~|~01/BRO~|~Bridge Repair from accident damage.LOR-20-9.99 (SFN 4701917)~|~13 - Bridge Rehabilitation~|~45DB62D394AC942C1DA7F543D33E2EE5CE6759E0 107411~|~1~|~1~|~01/SAF~|~Install new and upgrade existing guardrail on various county roads.~|~21 - Safety~|~81DFD8294F9E92C299F5600873EF5633B4E9F06E 107411~|~1~|~2~|~02/SAF~|~Install new and upgrade existing guardrail on various county roads.~|~21 - Safety~|~40D2D60A3FC0C556A83BD75804B55D12FD202B5D 126740~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding. ~|~44 - Other~|~02600D6AD0388EDED332B9905A24B8BF11BE13B2 85371~|~1~|~1~|~01/S>2~|~Funding split for paving work on the Urban STP portion of the project from SLM 6.00 to 9.49.~|~05 - 4R Maintenance - Resurfacing~|~0832CE69A0BFD7E5E2586EF16DCD598EFF5CAB37 85371~|~1~|~2~|~02/NHS~|~Split for paving work on NHS section from SLM 9.49 to 10.08.~|~05 - 4R Maintenance - Resurfacing~|~638FDB75698A7A139A2B7925355297FA1ED967B8 85371~|~1~|~3~|~03/NFP~|~100% local participation which are not eligible for Urban Paving funding.~|~05 - 4R Maintenance - Resurfacing~|~42671C0A0729ECCEAC0A7287060A218D647718BE 121253~|~1~|~1~|~01/SAF~|~Systematic sign upgrades in Clinton Co~|~21 - Safety~|~E3604954B57F9A076A48D7C707897C2EADBF605C 124523~|~1~|~1~|~01/STR~|~stp rural~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~414D764DE8A6F9CBAE1EEA01E37D34EC1E4D1491 99441~|~1~|~1~|~01/MPO~|~Demolition of structures acquired by the City of Cincinnati as part of their HAM-CR 612-0.20 project (PID 87036).~|~44 - Other~|~06C860D9C0FD7CC5D47DE9A22195A9FC4B1DE772 125464~|~1~|~1~|~01/S5K~|~80% District preservation funded, 20% Local City share for work on SR 199 within the City of Upper Sandusky.~|~05 - 4R Maintenance - Resurfacing~|~F3A648D69FA6FF7D05CC9BD46F849FAF5EFA71E8 125464~|~1~|~5~|~05/S5K~|~100% City items for resurfacing in Upper Sandusky. Pavement repairs, aux. pavement markings, and curb ramp work included.~|~17 - Construction Engineering~|~A68092597A56E031493186B27C3E54BA136CAFD1 125464~|~1~|~4~|~04/STR~|~All work within the Village of Carey which falls under the "STP Rural" classification. ~|~17 - Construction Engineering~|~2951C5B7B95A5A03B69509A724C6F18624F58AAD 125464~|~1~|~2~|~02/S5K~|~Work within the Upper Sandusky urban area but outside the City of Upper Sandusky corporation limits. 100% district funding using 80% federal funds, 20% state funds.~|~~|~305DAA37ECB1A39C323EA3E09894834614D0FFAB 125464~|~1~|~3~|~03/STR~|~Work that falls within the "rural" classification on SR 53 and is within the City of Upper Sandusky corporation limits.~|~~|~0A5A084448F9B75776C8226AC1D03C658B3FE3BF 111218~|~1~|~1~|~01/IMS~|~Resurfacing of Kenmore SB ramp to IR-277 EB in the City of Akron, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~E12C4A6A90A3D36A95D074FB364808CF122D6A41 107742~|~1~|~1~|~01/NFA~|~The Village will extend N. West St 1925 ' from Jackson St to Baker Rd. The street will be constructed to include a 33' asphalt pavement width designed for commercial/industrial traffic loads with 2' concrete curb and gutter, storm sewer and catch basins.~|~01 - New Construction~|~2ED405F3E36ECF2FCD39F4A7AB68773203A8B779 88550~|~1~|~1~|~01/ENH~|~Freedom Secondary Trail Ph 2~|~28 - Facilities for Pedestrians & Bicycles~|~3D4465B147F9FD261D71A6D6900507D3F6D6B431 102934~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~13 - Bridge Rehabilitation~|~0AC91ECC1613D3449907EA6F4046F4B320D99F58 99505~|~1~|~1~|~01/NFA~|~The City is improving 1000 feet of Ottawa street with will serve as a new gateway to the Owens Coring World Headquarters.~|~04 - Reconstruction - No Added Capacity~|~3F7395BF2A9FACB53CB1E2F10BF4AAD504FA02EA 112556~|~1~|~1~|~01/NHS~|~resurfacing on HAM-50 which is a NHS location~|~05 - 4R Maintenance - Resurfacing~|~A0539F1F670E150FD81C2898B9DE9DCB40198AAE 99764~|~1~|~1~|~01/NFA~|~Ross Industrial Parkway.~|~01 - New Construction~|~87471776F6C5BFD66C7320C2F04077B6C2022547 108760~|~1~|~1~|~01/BRF/KCEO~|~Knox County CEAO Federal/State Exchange Program - 4C87 (State 80%) / LNTP (Local 20%) - See CAP Comments - Replacement of Kno-TR 402-00.06 SFN 4237064 Coffing Road over Granny Creek~|~10 - Bridge Replacement~|~9EC2F96B3D0936A2062F82BBA10E787758497863 97357~|~1~|~1~|~01/NFP~|~Tree/bush removal, pruning~|~44 - Other~|~E4D146477107A2D7D6317E25B2DC682F854DD3D5 117172~|~1~|~1~|~01/ENH~|~MEG-Middleport Streetscape Ph 1. Reconstruction of sidewalks and curb ramps.~|~28 - Facilities for Pedestrians & Bicycles~|~140012CA4A9CD9C82E3C2C47984D37C89F039366 119833~|~1~|~1~|~01/S>2~|~Safety and pedestrian improvements on 17th Avenue~|~21 - Safety~|~19876470D9F239E73390AC14C89B5AC3D6A1BF32 89853~|~1~|~2~|~02/SAE/GCEO~|~"02/SAE/OT/GCEO" County Engineer's Association Organization Guardrail Upgrade 4HB7(100% Federal) - CAP of $600,000.00 federal - Guardrail on Major Collector with Guernsey County.~|~21 - Safety~|~23462CD745B8F3D84D65B51C5791CEEEC8D7DFD4 89853~|~1~|~1~|~01/NFA/CCEO~|~"01/NFA/OT/CCEO" - County Engineer's Association Organization Guardrail Upgrade 4HB7(100% Federal) - CAP of $600,000.00 federal - Guardrail replacement and upgrade on routes to be determined in Coshocton and Guernsey Counties.~|~21 - Safety~|~8B9DEBA9AA60D3CE06A711E7046A069E8C1FDD96 112415~|~1~|~1~|~01/CMQ~|~Plan split for tunnel extension using CMAQ funds.~|~44 - Other~|~979CE3938AE443212544D8E8FC40F25A01290A21 107690~|~1~|~1~|~01/NHS~|~WOO-6-14.82~|~13 - Bridge Rehabilitation~|~F1202D77D78D8C0C3B08719484144BDB2D0BDC3E 108507~|~1~|~1~|~01/STR~|~Culvert Replacement~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A48CCF9BBE74C65C20EE570407464445790EA5AB 119514~|~1~|~1~|~01/S>2~|~FRA Ferris Road (CR 172) from Minnie Road to Cleveland Ave.~|~28 - Facilities for Pedestrians & Bicycles~|~24D85E5323F263D6BD5B7533490FCC7DE60ECA4E 101215~|~1~|~1~|~01/NHS~|~US 20 resurfacing of 2.24 miles.~|~05 - 4R Maintenance - Resurfacing~|~158C17766FD23DCDEDBFF4C7F968C98A8D652286 86649~|~1~|~2~|~02/IMS~|~D6 funding for patching and sealing on 1 structure:2502844 FRA IR270 21.8 Intersect: Over I-270~|~13 - Bridge Rehabilitation~|~463B7D93CCD51C4C10B749E785DEE7E3A0FDA80A 86649~|~1~|~3~|~03/NHS/COLS~|~100% City of Columbus items SLM 17.57-18.63 & 21.40-22.45 ~|~05 - 4R Maintenance - Resurfacing~|~56D483A2F2726F7ADC67225D9724756882DFDC89 86649~|~1~|~1~|~01/NHS~|~Columbus urban paving of US-40/E Main St from SLM 17.57-18.63 & 21.40-22.45~|~05 - 4R Maintenance - Resurfacing~|~BD506314CBC6B45BB5AD5C5F00E3CC41506402E8 98719~|~1~|~1~|~01/BRO~|~Bridge Work - No Added Capacity~|~~|~088AFCE5B3ABD5B05C64F77512FBA87F6B211916 100323~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay on TRU SR 7 from 5.66 to 8.75 and TRU SR 46 from 7.08 to 7.30.~|~05 - 4R Maintenance - Resurfacing~|~4E2E232EE7909CE1A78F09050C65EF5E0F0F7AEE 100323~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to TRU SR 46 7.30 to 13.39.~|~05 - 4R Maintenance - Resurfacing~|~83DB3D6490DB4AD507F564A7DD56FC3E58FD82D3 122234~|~1~|~1~|~01/NFA~|~NEVI Round 2B 8 30-A~|~~|~A89CEFFD35F605AADF3FF9EB1BD17579AFAF6AC3 122234~|~1~|~2~|~02/NFA~|~NEVI Round 2B 30-A~|~~|~0B008C8067F10C6E186711CD45C817252D6C591C 105232~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~563ABB6A518749CF8021876417F3A28A20F787D8 93956~|~1~|~2~|~02/NFP~|~From SLM 19.45 to SLM 20.65 for items beyond curbs and deeper than 3.5"~|~05 - 4R Maintenance - Resurfacing~|~54E260D4B5D8AA154211BB63B1C6863CBED59607 93956~|~1~|~1~|~01/S>2~|~US-24 from SLM 19.45 to 20.65. This is for Urban Paving work items located in the area from face of curb to face of curb to a depth of 3.5".~|~05 - 4R Maintenance - Resurfacing~|~9527CD3F1C1B35AC6EC46DD2C244CDEB91737646 105306~|~1~|~1~|~01/NHS~|~US-23 in Fostoria.~|~05 - 4R Maintenance - Resurfacing~|~6A3062A489252D2651559B47A3BB269AE7605556 77545~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete from the DAR/SHE County Line to 0.59 mile East of the junction of SR 66 (SLM 4.53) SHE-SR-47 0.000 to 4.510 0.000 to 4.510 9.02 Lane miles~|~05 - 4R Maintenance - Resurfacing~|~2ECDC9A5BCFB50D824AB37A64FAE77D87992B72C 100625~|~1~|~1~|~01/STR~|~Resurfacing TUS-258 from CR 3 to GUE Co. Line and GUE-258.~|~05 - 4R Maintenance - Resurfacing~|~84CCE0965BDB5705FF288566D48BCA35215672E0 100625~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~2C58A7A9F9948F2B5740188082BA5B8151C5FE91 125713~|~1~|~1~|~01/NFP~|~Spot paving throughout District 11~|~05 - 4R Maintenance - Resurfacing~|~6F1E311C32AFE7A7FC3C00E9523604F96D70178E 100349~|~1~|~1~|~01/NHS~|~District capital allocations for resurfacing of US23 from SLM0.00 to SLM6.65.~|~05 - 4R Maintenance - Resurfacing~|~11B8AEBDAAF2805DB1137B7F5304B6EF8CA1CFB3 101341~|~1~|~1~|~01/NHS~|~Plan split for all work associated with HEN-6-1722 relining~|~04 - Reconstruction - No Added Capacity~|~8078EBE0E60D013F3C7BDD7FCD8AAAD1DDAA3F33 124526~|~1~|~1~|~01/STR~|~stp rural~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~694DE50B6B4F906F4002FF9D6433F028B40C1963 100813~|~1~|~1~|~01/STR~|~Replace bridge size culvert~|~~|~1759263798BDB9596D2074CDBCDB5586477ED121 115783~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~8580539A2F4970B9BB6942650CBBCB9FD7A637C4 115783~|~4~|~2~|~02/NFA~|~Gahanna SIB Loan ~|~~|~86D276F4849E7EA3E51441D11081D353A8DAB996 115783~|~1~|~3~|~03/NFA~|~Gahanna SIB Loan ~|~~|~96D43107D988268D3343CAB2C54E9A14E7A2B620 126004~|~1~|~1~|~01/IMS~|~PID FUNDING ESTIMATE~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~96C4A8D333065DBF18F5AC1F539E20C868E16373 119202~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~7E077A4E0B85834E74926629ACD3D85AE5957926 97280~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~5D3C1F89ED24A53E5F1CEC147C4599BF18315A26 119086~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F2B140731CEC341A8C227571F4585F1EED2CEB73 119086~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C280672207527BEBF18E8B7A0CE33B063F6B5051 98763~|~1~|~1~|~01/S<2~|~Installation of fiber optic interconnect cable to connect the signalized intersections within Sycamore Township. PTZ cameras will also be installed at several signalized intersections.~|~44 - Other~|~4FC32ED3176183BDCDD5EC004359F625F7F70C05 91060~|~1~|~1~|~01/SAF~|~Widen Fields Ertel Road to provide a right turn lane to northbound I-71, restripe Fields Ertel and Mason Montgomery intersection, widen Gregory for an additional northbound lane and restripe the Gregory and Fields Ertel intersection. Apply access management principles on Fields Ertel from the southbound I-71 on ramp to Royal Point Drive.~|~21 - Safety~|~DC8ABF991C3223682178239B53286302E66C7D19 100959~|~1~|~1~|~01/IMS~|~TRU IR 80 from 4.71 to 8.56.~|~05 - 4R Maintenance - Resurfacing~|~7A1C0699FBA69F7047448671067D87F842AC5B80 22891~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1806637~|~10 - Bridge Replacement~|~0C89906AB0CA7E65F73DEFC9C0EFC58C6F3FFF5B 94219~|~1~|~1~|~01/NFP~|~District wide pavement marking and raised pavement marking contract for FY2019. Locations to be determined.~|~21 - Safety~|~8DD65BCD6885ECD849A41F3856B1CC34562FE4A7 114099~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~21 - Safety~|~66578998F2145C53A1610FA69417BBDF082ED492 108813~|~1~|~1~|~01/BRO~|~Replace superstructure on bridge CAR-43-0391 (SFN 1000748).~|~13 - Bridge Rehabilitation~|~E64693F2C7C070D83242053E95CE2AC7DC2E85AA 85601~|~1~|~1~|~01/S>2~|~80/20 fed/state funding split for all work using federal STP funds on urban section.~|~05 - 4R Maintenance - Resurfacing~|~8749240DE6957A6D11C458BC579DAD4CE4336470 85601~|~1~|~2~|~02/STR~|~80% federal / 20% state funding split for all work using federal STP funds on rural section.~|~05 - 4R Maintenance - Resurfacing~|~92B6DCED625D8ACDAB9A5B24ACB6E0FBC458B9C6 93493~|~1~|~1~|~01/BRO~|~Plan split for all costs associated with structre DEF-66-0149.~|~10 - Bridge Replacement~|~44D542B7BDC91CCC67AB4AEF34BC2DD04422C15E 100185~|~1~|~1~|~01/S<2~|~Work on Industrial Drive and Production Drive which are both Major Collectors in the Findlay Urban Area. 80% federal funds from the City of Findlay Large City budget with the 20% match being local funds provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~7D755E2B602280F49ECCE1F07BC7ACBDF717CFFC 93484~|~1~|~1~|~01/IMS~|~Culvert Liner - State Term contract~|~44 - Other~|~3FC501C07A68F446FFC7E860904A775D840C78D5 117051~|~1~|~1~|~01/IMS~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~D8E77719E50C8D7A237D786A48F31168AE642004 109848~|~1~|~1~|~01/NHS~|~Type A temporary pavement repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7052DCD65DC0088901D79DBC1222175582472ED1 21492~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation Marking Pavement Program - 4MP7 (100% State) - No CAP - Annual contract for placement of Spray Thermoplastic Striping within District 5 on IR; US; and SR~|~05 - 4R Maintenance - Resurfacing~|~FE22C41252061CC52FFB3CF7CF34B7305CE48C16 92654~|~1~|~3~|~03/BRO~|~Deck sealing and minor work to SFN 7804652, BR Rehab eligible.~|~13 - Bridge Rehabilitation~|~4C62C46F74905C6CD57C0C07E070C8C633BC68A2 92654~|~1~|~2~|~02/NHS~|~See linked structures > 20'. Non-BR eligible.~|~13 - Bridge Rehabilitation~|~7992358624BBFFE4C6AA1982D593F572FF4C364C 92654~|~1~|~1~|~01/NHS~|~Resurfacing of State Route 82, from SLM 17.47 to SLM 22.74, in Howland and Vienna Townships, Trumbull County, Ohio. Includes minor work to SFN 7804733 (12 ft) Structure.~|~05 - 4R Maintenance - Resurfacing~|~C683691AA7AD2B7C477EA68F1619A4738C1B6CD5 122451~|~1~|~1~|~01/NHS~|~Eliminate scour at bridge BEL-7-2497 carrying SR 7 over Patton Run and TR 469 by reestablishing the banks of Patton Run and fore slope of TR 469. The project will protect against future scour by placing rock channel protect along the banks of Patton Run.~|~66 - Resilience Improvement - Highway Project ~|~D2432D0018B0AF4C45CF8A1948732CC1B55706B1 109455~|~1~|~1~|~01/SAF~|~Safety, Intersection Improvement~|~21 - Safety~|~4C07761C7C1606651C96FE801EF48B74DD05003E 109455~|~1~|~2~|~02/STR~|~Rural Lorain County Water Authority (RLCWA) will be responsible for paying for all the waterline relocation work.~|~04 - Reconstruction - No Added Capacity~|~A3B97044CADB199750235AF2AD96F5F35FA45BEE 104277~|~1~|~1~|~01/NFP~|~Reactive Pavement Maintenance~|~44 - Other~|~02138127570B3DA59923FB5614BF6FA83D319901 110277~|~1~|~1~|~01/CMQ~|~Construction of sidewalks in the City of Lima.~|~28 - Facilities for Pedestrians & Bicycles~|~4D75A2C1D18437F388117C6C601A4CC622120CCC 124658~|~1~|~1~|~01/SAF~|~Primary plan split for Safety funded work~|~21 - Safety~|~DCC006FF4902C8596D4C193C52DF150393E1B488 93093~|~1~|~1~|~01/STR~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~96D06E6BC5ECDDA66DCF5B52A8D2838641CDBA51 122415~|~1~|~1~|~01/IMS~|~Plan split for guardrail replacement~|~21 - Safety~|~DF527B45CD9F34D058BDF7FEE1165F111CEF2F83 122415~|~1~|~2~|~02/S>2~|~Plan split for guardrail repair component of the plan set~|~21 - Safety~|~43281C0BD8C3F1D8C217C8F30FA3A005453C3217 123865~|~1~|~1~|~01/NFA~|~Lanterman Rd resurfacing.~|~~|~F35EFDA06FE862B018F2460682A232BF3F08F725 106670~|~1~|~1~|~01/NFP~|~Work to rehab a bridge. State funds from the Federal/State Exchange Program with the local match provided by the Defiance County Engineer.~|~13 - Bridge Rehabilitation~|~386EBF2741CDC03E82D38DD9713A0CC5E7A58F1A 104062~|~1~|~1~|~01/S<2~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~352A1147D2B50F557630FA258F09D7E7CC890E94 101183~|~1~|~1~|~01/NHS~|~Pavement plan split for SR 104 per 7/20/15 spreadsheet.~|~05 - 4R Maintenance - Resurfacing~|~86ED6AD8ECE9E81FE063AF80F0699375DEAACA98 103371~|~1~|~1~|~01/CMQ~|~Conversion of the existing stop controlled intersection of Butler Warren Road and Western Row Road/Barret Road) to a modern roundabout.~|~21 - Safety~|~96759D692539EDB99CE1DF8411BB37BDDC4204F1 106592~|~1~|~1~|~01/SAF~|~Improve BUT-122 from west of Hursch to east of Michael to address fixed object crashes.~|~16 - Right of Way~|~D01E910E435BA79FB926E4BB21CEB8601F0FC119 109043~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2EEDF01A3A9FE1FF2B713F24893F801399EDDD8 89482~|~1~|~1~|~01/STR~|~Rural route GSMP Funds. retaining wall failure. remove exisiting wall and flatten out embankment.~|~04 - Reconstruction - No Added Capacity~|~57CEDD80B2C9F90A81B65DD1C8ED73D8FAC49282 80963~|~1~|~1~|~01/SAF~|~Adding left turn lanes on the US 422 approaches to Main Market Road~|~21 - Safety~|~9EBCE4293F86FFE8C08A9F161FB4422D80A73DD8 87393~|~1~|~1~|~01/NFA~|~LAW SR775, 12.84 Slide repair. 3.83 miles south of S.R. 141 intersection 100% state01/NFA/OT/State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~02E1B98F494D761E994A9EE842B86B3831F6E29F 81866~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - District Preservation 4PS7(State 100%) - No CAP - Auxillary Pavement Markings on various routes in District 5~|~21 - Safety~|~63522134EAA4F1A77C7D09F4DDE6FA0AAC2478D1 100790~|~1~|~1~|~01/NFP~|~RPM contract~|~21 - Safety~|~C469F25F61EC846564C91DC1C760EAB05CA7405D 102048~|~1~|~1~|~01/NFA~|~The city of Northwood is working with the developer of McNerney Industrial Park to extend a new road (Commercial Blvd) north of McNerney road 650 feet in order to provide access for new industrial growth.~|~01 - New Construction~|~380328595DE26D2E5BC5E8AF988AD16136C147D8 124996~|~1~|~1~|~01/NFA~|~Various CR GR FY 2029~|~21 - Safety~|~802F80E5CF1314D890177534020FD26A791D35E7 106490~|~1~|~1~|~01/NFP~|~All work in the project.~|~05 - 4R Maintenance - Resurfacing~|~4B1F74B87504C00186C59E6E787E4DA1A7ED3F95 127269~|~1~|~1~|~01/BRO~|~Replace twin culvert bridge~|~10 - Bridge Replacement~|~11BD8A5411354CF30EC4BD507AD62F5DED63B166 107487~|~1~|~1~|~01/STR~|~Resurfacing BEL-149~|~05 - 4R Maintenance - Resurfacing~|~023DA670245BC83E2634CBCBD6610EB48D79A2EC 107487~|~1~|~2~|~02/NFA~|~Resurfacing SR 147 from SR 149 to SR 9~|~05 - 4R Maintenance - Resurfacing~|~1E5D43E183C9BE694B82436BF5DCEFF153184F08 102037~|~1~|~1~|~01/NFA~|~Bridge replacement plan split for local birdge.~|~10 - Bridge Replacement~|~73380356B9EAA34142F3F5CA8DD2D5ECBB4AB447 96103~|~1~|~1~|~01/NFP~|~36" pipe~|~44 - Other~|~F77E3B0DC8722B97EC0FBF11AAC3E0BB74154529 117941~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties.~|~21 - Safety~|~592F1B9E3DA90D105AD042352EC3D543202470A5 96974~|~1~|~1~|~01/IMS~|~Traffic Signal upgrades on various routes throughout District 4.~|~21 - Safety~|~E19F416BC0304391AC5EEBFD52F20F9538DB4D63 92222~|~1~|~1~|~01/IMS~|~100% state funded plan split for all work using state district allocation funds.~|~47 - Bridge Preventive Maintenance~|~7325CE4DD8A00711485658631976C6BC8B5D0AC6 121878~|~1~|~1~|~01/STR~|~Reconfigure the intersection to a traditional four-way intersection~|~04 - Reconstruction - No Added Capacity~|~E2E7D9299A9BF364C5581BCE93D66C53EB0A7835 112842~|~1~|~1~|~01/NFP~|~All work in this project.~|~01 - New Construction~|~F4665BE2B8DA90079598559E76B1B1955E50612E 116830~|~1~|~1~|~01/ENH/STRU~|~Sidewalk upgrades/repairs.~|~~|~5AD7C962BAEDE26162FE1C6103523741B88CD2EA 101768~|~1~|~1~|~01/BRO~|~Replace existing deck on bridge carrying SR 39 over Riley Run.~|~13 - Bridge Rehabilitation~|~3BC88BA9CF32F1608366FFFAC680EE6E7EF79AB7 114401~|~1~|~1~|~01/NFP~|~Culvert Lining~|~04 - Reconstruction - No Added Capacity~|~78618ED4FBD32F0C3754A0DBCC33FDCD10408933 110376~|~1~|~1~|~01/SAF/Cols~|~Intersection improvements at Maple Canyon~|~21 - Safety~|~5160FE38ED066BA33125A59F4907DFE155A8AEDC 109746~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~17 - Construction Engineering~|~8DE685C3670359DA6D2C7BBFA3B47F5D96CCD55F 93487~|~1~|~1~|~01/BRO~|~Replacement and widening of sfn# 5003229, structure over IR680-16.32.~|~10 - Bridge Replacement~|~647A3A2D7561E388E12C0375AFF6DC483A15A4B1 124906~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~785A850234EC48CC35628300F88F0320E7340A49 112211~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-CR 77-5.00 (SFN: 0930288).~|~10 - Bridge Replacement~|~F6B4CC335E130F26692A310E8AADE5B0F281C69C 98794~|~1~|~2~|~02/S>2~|~Improving US 40 to a five-lane cross section from the new Airpark Blvd. west of the Dayton Interenational Airport to Peters Pike and improving the Interchange at the Airport Access Road and US 40.~|~03 - Reconstruction - Added Capacity~|~5F162BAED39078A8D1FA6B5FEF94CDA64F894455 98794~|~1~|~1~|~01/NHS~|~Improving US 40 to a five-lane cross section from the new Airpark Blvd. west of the Dayton International Airport to Peters Pike and improving the interchange at the Airport Access Road and US 40.~|~03 - Reconstruction - Added Capacity~|~BAC83F53248F691D9E57E29D5E72061F227EEF56 99981~|~1~|~1~|~01/NFA~|~Old National Road at the Stillwater River - Construction of a covered bridge to enhance existing bikeway/pedestrian access and providge a connection with the regional bikeway ayatem. The bridge would be constructed on the precise location of the former Historic National Road covered bridge.~|~17 - Construction Engineering~|~507D7033F4D62A1CE17F19FA125DA44FF2CBA6DC 93272~|~1~|~1~|~01/STR~|~General system paving of MRW-42: 0-12.71~|~05 - 4R Maintenance - Resurfacing~|~D47904FF5268615E3E2CC8034DC23738ED2EED38 115353~|~1~|~1~|~01/MPO/MOGA~|~Resurfacing, in the Village of Mogadore.~|~05 - 4R Maintenance - Resurfacing~|~98E9DE187882811057EC966991A94DD1984D21C3 115353~|~1~|~2~|~02/MPO/POCE~|~Resurfacing, Portage County Engineer.~|~05 - 4R Maintenance - Resurfacing~|~95FB892DB224C895891BC046DE7789E6E356412C 125579~|~1~|~1~|~01/BRO~|~Plan split to program project, updated when scope is complete.~|~13 - Bridge Rehabilitation~|~FE788590FF879371AD869C22EF22ADF27BDF7D42 95218~|~1~|~1~|~01/SAE~|~100% CEAO federally funded Safety project~|~21 - Safety~|~13C59445CCEA334421ED4E2C78B29C36AEA9226D 113158~|~1~|~1~|~01/NFP~|~The Village of Evendale will construct a 2-lane extension of Aerohub Boulevard from its existing terminus north for an estimated 1,600 linear feet.~|~44 - Other~|~5D98F38DBC3C14239EB6AF3D1CC4E163379CACF7 102395~|~1~|~2~|~02/NHS/RAVE~|~POR SR 14 from 9.82 to 10.15, Urban Paving in the City of Ravenna.~|~05 - 4R Maintenance - Resurfacing~|~C08C97A4CF5D9D6013C222D8C5EBBC6D07D1D749 102395~|~1~|~1~|~01/NHS~|~POR SR 14 from 6.66 to 9.82 and POR SR 59 from 3.33 to 5.87.~|~05 - 4R Maintenance - Resurfacing~|~2E0A4BACE22150890F0B1317D13C5EB6023C2AE8 93608~|~1~|~1~|~01/NFA~|~Provide pedestrian facilities and upgraded crossings near schools in the Stow-Munroe Falls school district.~|~28 - Facilities for Pedestrians & Bicycles~|~8F5619F2251F0ADA915ACE1D39E75D16C5555C64 117906~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I70-D LIC/MUS 129-153~|~44 - Other~|~42B1806A127A2906F3B218D563C15AC1BAE089A5 77266~|~1~|~1~|~01/IMS~|~IR-76 and State Street Interchange and IR-76 and Wooster Interchange in the City of Barberton, Summit County, Ohio.~|~~|~4A1645022E8ADC5C894D10DEC4F359E50E9FD347 101050~|~1~|~1~|~01/STR~|~Overlay SR 29 in Champaign County with smooth seal~|~05 - 4R Maintenance - Resurfacing~|~7AE6586892C31043EA33B9296D838E4DD7B61865 114570~|~1~|~1~|~01/STR~|~AC Overlay without repair~|~05 - 4R Maintenance - Resurfacing~|~60CBA78A623B7CCC3F888270C666C5EB8C7B1A2E 100586~|~1~|~1~|~01/NHS~|~Microsurfacing on COL-30 from SLM 0.00 to 8.87 and on COL-9 from SLM 12.28 to 13.06~|~05 - 4R Maintenance - Resurfacing~|~C1BDAEF062F9C84A849B0EE3F84666275CC544FD 100586~|~1~|~2~|~02/S<2~|~Microsurfacing of COL-62 from SLM 4.86 to 5.44 and COL-9 from SLM 12.12 to 12.28~|~05 - 4R Maintenance - Resurfacing~|~8D3C3AE2D6D1DA5C7593AB7C575A30A5F645BE00 100586~|~1~|~3~|~03/STR~|~Microsurfacing of COL-62 from SLM 5.44 to 10.02 and COL-9 from SLM 4.00 to 12.12~|~05 - 4R Maintenance - Resurfacing~|~8C60E7D5D007DF499C8501098F2AF8ABFF66DBCC 112477~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~05 - 4R Maintenance - Resurfacing~|~E0DF1F1C30A855DCB2BB2246BFDC59F84263EB53 108464~|~1~|~1~|~01/STR~|~PIK CR 50 2.55 ER repair project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A7388D95A0997A517E54885BB25FC3F64D22B8B2 91005~|~1~|~1~|~01/IMS~|~Overlay IR 75 ~|~05 - 4R Maintenance - Resurfacing~|~36FDC900395937C00DACCD16393BD0D23ADB511A 119504~|~1~|~1~|~01/S>2~|~A safety improvement project on state Route 93 in Lawrence County. Addition of a left turn lane on LAW-93 at the intersection of Porter Gap Rd.~|~21 - Safety~|~04AAC0E2CE392A1EFC1375CE698F3D18AB551DB5 115094~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1E1459653AA6661BAAC11AC877D4A730CAE23DA5 109696~|~1~|~1~|~01/NFP~|~Guardrail replacement and repair at various locations~|~21 - Safety~|~F6030F475E8A78BDD4F9E4EF03DF3F7E33406BF2 108174~|~1~|~1~|~01/S>2~|~ER repair - repair landslide that occurred along WB US 50.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~695A4A8F69C63B263D5AB14B3EE52BCCE447349A 108174~|~1~|~2~|~02/S>2~|~plan Split for the facia treatment and barrier of the existing crib wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~41F50FEB46D54F5534DD2E92B583919A4B64B6E7 83689~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH CR 1A 2.89 (SFN 0530352) and ATH CR 45 0.86 (SFN 0549460). Federal 95% with Credit Bridge and Local share is 5%.~|~10 - Bridge Replacement~|~E68123BF4AC4949B2FE2F6A827E30DF62797C087 105360~|~1~|~1~|~01/STR~|~Microsurface rural routes: MIA US 40 SLM 4.25 to 6.30 & DAR US 127 SLM 1.23 to 9.52~|~05 - 4R Maintenance - Resurfacing~|~D3897027DD8D6C54D241FEFEB64299B67F442445 105360~|~1~|~2~|~02/S>2~|~Microsurface on large urban routes: MIA US 40 SLM 0.00 to 4.25~|~05 - 4R Maintenance - Resurfacing~|~8C5BFF8C9D77BB7053A2F9511D268C997B053C70 113754~|~1~|~1~|~01/SAF~|~Pavement marking~|~21 - Safety~|~EF699677F9DB450CB695C1DD35FA2C71582B3590 113754~|~1~|~2~|~02/SAF~|~Pavement Marking~|~21 - Safety~|~FB6E00ADDC4DE6EE5B8EDCE49FAD711F259ADDFB 117462~|~1~|~1~|~01/BRF~|~Bridge rehabilitation (SFN 6530036)~|~13 - Bridge Rehabilitation~|~FFEF32FA4CB2AD2F1E56730BD41AC1388C0A719D 126753~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~13D2C54E5D96D03ECC39CB4530102A8B168C1211 88901~|~1~|~1~|~01/IMS~|~Split for barrier replacement~|~21 - Safety~|~AB8A461C06FCE662751775051AD297EF84674411 124213~|~1~|~1~|~01/BRO~|~Bridge replacement with 80% CEAO LBR (4B87) and 20% Local (LNTP) funds. ~|~10 - Bridge Replacement~|~7C6E47F51D73A0E56FCFEFD3A596CC5C13D2F0CA 93858~|~1~|~1~|~01/S>2~|~Project will widen Dayton-Xenia Road (CR-142) to three lanes from Woods Drive to just east of Wallaby Drive to provide a center two-way left turn lane. In addition, the project will add an 8 foot wide sidepath on both sides of the roadway, improved shoulders, and installation of curb and gutter and storm sewer improvements.~|~04 - Reconstruction - No Added Capacity~|~BDCABD6D0DE385CFE7E5D1C347DED2090F087B7B 101786~|~1~|~1~|~01/NFA~|~The Village is constructing road improvements to support an expansion at the Charter Steel Rolling Mill, opening a new truck only access by widening the current access road off of East 49th into their plant.~|~01 - New Construction~|~860086C5314D06F6C2B5BD65CD352B8ACB6C190B 105420~|~1~|~1~|~01/STR~|~Repair or replace culverts on rural routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~94CBC209E8651A9D6A57B554F0844EFC1707DC28 99386~|~1~|~1~|~01/STR~|~"01/STR/OT " - plan split for construction of a salt storage building at the existing Baltimore outpost.~|~~|~F834F357FBE5057F8B5A5CA2E1B90AB904C078BF 98222~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (100% State) - No CAP - Annual contract for placement of Fast Dry Long Line and Auxiliary Striping within Eastern District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B36F2A7392D2907EC6089428B2778EA62A2F8914 84990~|~1~|~1~|~01/BRO~|~Bridge rehab~|~13 - Bridge Rehabilitation~|~8415091D34D76A185424915A9E7859B79569C80F 109299~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail~|~21 - Safety~|~D5073F421235811C8431E8FBE5CAACA307FF92C4 127090~|~1~|~1~|~01/NFA~|~SOPEC EV charger projects ~|~63 - Electric Vehicles & Charging Infrastructure~|~A96DA192DA882A6C25EC379CC9B1D3E35EFB2503 107718~|~1~|~1~|~01/STR~|~SFN 7203284~|~13 - Bridge Rehabilitation~|~F2C725E643F54B213D4D5E16514E512E354BD453 105792~|~1~|~1~|~01/BRO~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~69AAC20FD7A9282C45F89799D3FEE73A110D0073 105792~|~1~|~2~|~02/BRO~|~Split for 100% local work for CEI relocation~|~13 - Bridge Rehabilitation~|~8BCB6D2814EF50E585523EB1EC431A2F6FF7E8CA 105792~|~1~|~3~|~03/BRO~|~Split for 100% local work for Dominion relocation~|~13 - Bridge Rehabilitation~|~523000050B6F49BC826892EF24B2525C30E4BB5D 105792~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~66B4B04100AC1E430421B989005102A37652129C 98798~|~1~|~2~|~02/NFA~|~Reconsturcting 3250 feet of Henricks Road between N. Four Mile Road and N Meridan Road~|~05 - 4R Maintenance - Resurfacing~|~09A8AE06014DA9252E0B9593A72BE2203FB941BD 98798~|~1~|~1~|~01/NFA~|~Mahoning County Engineer.~|~~|~46376E57A433A647CC937A118C39AFD6217A9B4B 110555~|~1~|~1~|~01/IMS~|~Rehabilitate the Bridge that carries SR 28 over I-275 by overlaying the deck, replacing the barrier and replacing the Vandal Protection Fence.~|~~|~513628799EED1FB827B1A352828B09CADA63239E 92835~|~1~|~1~|~01/SAE~|~guardrail~|~21 - Safety~|~6E8F16B702005D3D8775CFFB2845BF6815261F3E 92835~|~2~|~2~|~02/SAE~|~Added plan split for items over the Federal Maximum~|~~|~7864F75D999C68CF70E0EBD53C8394F044F1E300 92835~|~2~|~3~|~03/SAE~|~Added plan split for CE over the Fed. Max.~|~~|~9B04BDC88EC5F0E24CF21BE9FC2AE90AE7CAC832 100946~|~1~|~1~|~01/S<2~|~This plan split is for the small urban routes.~|~05 - 4R Maintenance - Resurfacing~|~29B00F1EFEC731ACF08B9528FAC0E927F1C9A34B 100946~|~1~|~2~|~02/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~7202602BA9D4F89118D58FBC80E44C046AC53106 109592~|~1~|~1~|~01/BRF/STCE~|~Replacement of Farber St structure.~|~10 - Bridge Replacement~|~A31653EC7FD0083E1A2B375B9AF034615B9F9E4B 96007~|~1~|~1~|~01/NHS~|~SFN 7200242~|~13 - Bridge Rehabilitation~|~E6F8CA3DCF174DDF9877F4E1C99FA2E3F1C8E3F7 87249~|~1~|~3~|~03/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1Brdgs to rehab:7303769 SCI SR139 8.24 Intersect: Branch Long Run7303793 SCI SR139 10.85 Intersect: C&O Railroad7303815 SCI SR139 11.45 Intersect: Rocky Fork Creek7303874 SCI SR139 11.77 Intersect: Yankee Run7303971 SCI SR139 16.49 Intersect: Little Scioto River7305109 SCI SR335 10.3180/20 split~|~13 - Bridge Rehabilitation~|~179F56263D6D9FF2D4E111BD63C86CD0A1867D08 87249~|~1~|~4~|~04/S<2~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1 Urban Area 0.52 - 1.51 Local match of 20%Project Termini: Begin at US52, north for 18.03 miles and terminate at the Jackson County line. 80/20~|~05 - 4R Maintenance - Resurfacing~|~48E0701C3552341D19508C4CCDC7071250E963A7 87249~|~1~|~2~|~02/S<2~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1 Urban Paving (not urban area) 1.51 - 2.72 Project Termini: Begin at US52, north for 18.03 miles and terminate at the Jackson County line. Brdgs to pave thru:7303491 SCI SR139 0.52 Intersect: Trib Of Munn Run7303513 SCI SR139 1.73 Intersect: Stream7303556 SCI SR139 2.68 Intersect: Munns Run80/20 split~|~05 - 4R Maintenance - Resurfacing~|~ABEA9B794F0238A1A6D44C7B1134ADAD49EDB933 87249~|~1~|~1~|~01/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 1 Rural Section 2.72 - 18.03Project Termini: Begin at US52, north for 18.03 miles and terminate at the Jackson County line. Brdgs to pave thru:7303572 SCI SR139 4.69 Intersect: South Fork Of Long Run7303602 SCI SR139 4.85 Intersect: South Fork Of Long Run7303629 SCI SR139 5.34 Intersect: Long Run7303653 SCI SR139 5.73 Intersect: Black Long Run7303718 SCI SR139 6.64 Intersect: Butler Run7303734 SCI SR139 7.52 Intersect: Branch Of Long Run7303912 SCI SR139 13.85 Intersect: Stream7303939 SCI SR139 15.07 Intersect: Stream80/20 split ~|~05 - 4R Maintenance - Resurfacing~|~AE9174F964F5330A65A39750492E5D72E39382B8 87249~|~1~|~7~|~07/SAF~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 2Safety Description: At the intersection of SR139/Maple-Benner Road SLM (4.98), it is proposed to realign the curve by adjusting the road profile to improve the sight distance.It is also proposed to add 2' wide shoulders from 3.0 to 10.5, and Access Mangement improvements for driveways at SR139 & High Street in Minford.90 Fed/10 state match~|~05 - 4R Maintenance - Resurfacing~|~B39288D99B2772D2C56AE5B2B1CB5D2C087F3E9F 87249~|~1~|~6~|~06/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 2 Bridge plan split 3.0 - 10.5~|~13 - Bridge Rehabilitation~|~C8CC44FA065F28E93ED1443A7234ED41F0ADDF08 87249~|~1~|~5~|~05/STR~|~SCI SR139 0.52 - 18.03 Resurfacing/Safety ProjectPart 2 Pavement plan split 3.0 - 10.5~|~05 - 4R Maintenance - Resurfacing~|~FEF05F5A455F5ED0C4E254205DA99FB1E5F90C3A 103825~|~1~|~1~|~01/NFA~|~Bridge repair on non-Federal aide routes.~|~13 - Bridge Rehabilitation~|~AC97054BBA6BB09BAEC46B415BE1F0BFA8F749EF 103825~|~1~|~2~|~02/STR~|~Bridge repair on rural route.~|~13 - Bridge Rehabilitation~|~327C4912785F8765432E89CEBF786BD323622A7C 88008~|~1~|~1~|~01/SAF~|~Install 2' paved shoulder laterally along the entire corridor where speed limits exceed 35 MPH 9Log Point 1.71 - 2.82 and Log Point 3.53 - 7.54) and install 4' stabilized/paved shoulder within 250' of the seven unsignalized intersections within the corridor, upgrade the traffic signal at the Spangler Road/Sycamore Street intersection and add an auxiliary signal head for Northbound motorists on Lower Valley Pike in Clark County.~|~21 - Safety~|~4E69055E917C7DEA15C615C626D7728804EFA9D1 118128~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funds. Roads are intermodal route connectors which facilitate direct intermodal interchange, transfer, and access into and out of a port terminal.~|~05 - 4R Maintenance - Resurfacing~|~8B1552E43B2A2CEB7D6CAB1F82024FBF093DCF94 118128~|~1~|~2~|~02/NFP~|~100% Locally funded plan split for drainage work~|~44 - Other~|~E8909C89269B5182899B9339A43248651D12FAC3 110560~|~1~|~1~|~01/STR~|~HIG-72-5.82 SFN 3601501 Bridge Replacement~|~10 - Bridge Replacement~|~A52C51DF1F48DBD1C6A01242F4C736FD47D3BC71 117603~|~1~|~1~|~01/STR~|~Replace culvert type bridge carrying SR 152 over Dry Fork.~|~04 - Reconstruction - No Added Capacity~|~94D1A6C8B1AC6D2E52AF29C5D21F4B8B3B60C3AA 122153~|~1~|~1~|~01/SAF/HUR~|~Safety resurfacing, shoulders, signs, guardrail, pavement markings.~|~21 - Safety~|~1F23F2A994C73834431BF95AE8EFD081D9EF7C68 122153~|~1~|~2~|~02/STR~|~Created 100% Local Plan Split to cover resurfacing costs not funded by safety monies.~|~05 - 4R Maintenance - Resurfacing~|~625C4D9E22CC62D4B90A56B2CF7C768C97215930 121843~|~1~|~1~|~01/S>2~|~resurfacing of Kauffman Avenue between SR 444 and Zink Road~|~05 - 4R Maintenance - Resurfacing~|~3EEB81FD1CA8E729714F1F64C7AB2CA028C4003B 110224~|~1~|~1~|~01/STR~|~Bridge ReplacementBRO CR 24 8.19 (SFN 0834815) & 8.35 (SFN 0834807)~|~10 - Bridge Replacement~|~757C4C885511FEAA31F701F8CDB12C10F34405B8 117799~|~1~|~1~|~01/NFP/NALB~|~Reconstruction of Green Chapel Road~|~04 - Reconstruction - No Added Capacity~|~11DE50A606382C1187FC2AB0F0CB692CBB19A3ED 91054~|~1~|~1~|~01/S>2~|~Federal/Local (Columbus) urban paving on Town St, SLM 0.00-1.2801/S>2/PV/~|~05 - 4R Maintenance - Resurfacing~|~A7BC4D777A3C994163182239BC77B1B647693A5A 116813~|~1~|~1~|~01/S50~|~This plan split is for the work to update the traffic signal hardware at IR 70 westbound and east off ramps at Mall Road (CR 28A) in Belmont County~|~21 - Safety~|~E841A70284F05DC70097190BF84A6A7393505827 101387~|~1~|~1~|~01/S<2~|~S<2 AC Overlay with Repair~|~05 - 4R Maintenance - Resurfacing~|~6CE02F8C3FEA3636C83E207CA5D4C4AF4E6AAF3B 101387~|~1~|~2~|~02/NHS~|~NHS AC Overlay with Repair~|~05 - 4R Maintenance - Resurfacing~|~1EC099C5BE8170B87E23500A21A6712E28ECD042 101387~|~1~|~4~|~04/S<2~|~Structures less than 20'LOR-301-2469~|~04 - Reconstruction - No Added Capacity~|~9EEDF96E0B61B5803C0D828192F45749E4E8E4E9 101387~|~1~|~3~|~03/S<2~|~Bridge work for structures over 20'LOR-301-24.99LOR-301-25.99~|~13 - Bridge Rehabilitation~|~36CB5999BBD2F3A3098E14DB12B38DEC7C202910 117878~|~1~|~1~|~01/NHS~|~Widening of SR 161~|~03 - Reconstruction - Added Capacity~|~1B4B478ADEBDDD6E51203C5D1E16D74CAEE7BDBD 114110~|~1~|~1~|~01/SAF~|~ Installation of RWR Pavement Markings~|~21 - Safety~|~A321F097B9D152B5AFD640690EF1E65D0505C24D 100474~|~1~|~1~|~01/STR~|~Microsurfacing of TUS-39~|~05 - 4R Maintenance - Resurfacing~|~2FEFDEAE93BEC128318FFA5056B1FCD4BD20F210 96930~|~1~|~1~|~01/NFP~|~State Project~|~04 - Reconstruction - No Added Capacity~|~FA7D6C485CA2543AFF485C49AD227DD7787DC13E 124060~|~1~|~1~|~01/SAF~|~Pedestrian Improvements on Harmon Rd (TR 221) and Northchester Rd (TR 1249) in Violet Twp.~|~21 - Safety~|~C3FA79961BFCBD01EB569032A148500FAD81D9C6 120109~|~1~|~1~|~01/NFP~|~Resurfacing a park road and parking lot.~|~05 - 4R Maintenance - Resurfacing~|~335E88C083B12AF593F572F04D461F3A2E2E39A0 113446~|~1~|~1~|~01/SAF~|~Install a new traffic signal at the intersection of West Main Street (SR 41) and Kings Chapel Road.~|~21 - Safety~|~0A4B59289F7A090D12E03C73CC96258EEE78EA13 83775~|~1~|~1~|~01/STR~|~Two-Lane resuracing project using an asphalt overlay treatment. MOE 78 8.13-15.06. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~19922069540BB3B81847672DA5B8971469A8E93B 91709~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. Rural other federal aid funded Federal 80%, State 20%.~|~05 - 4R Maintenance - Resurfacing~|~FD00FCCAC1BB9B4AF08BDE54A9621C8008944860 91709~|~1~|~2~|~02/S5K~|~Two-Lane resurfacing project using an asphalt overlay treatment. Urban other federal aid funded Federal 80%, State 20%. HOC 664 16.313-16.775.~|~05 - 4R Maintenance - Resurfacing~|~90C2B25AFED60F7D93EE8372AFE78395498BC16F 91709~|~1~|~3~|~03/S5K~|~Two-lane resurfacing project using an asphalt overlay treatment. Urban paving in City of Logan. HOC 664 15.87-16.313.~|~05 - 4R Maintenance - Resurfacing~|~400AE420C50E905464C299A73B4D025CB09C2605 91709~|~1~|~4~|~04/STR~|~Two-lane resurfacing projec using an asphalt overlay treatment. HOC 664 23.19-23.27. Funded with PROTECT funds 80%/20% state match.~|~66 - Resilience Improvement - Highway Project ~|~7C674AAAD0F5F31272D91B35B77BEA3AC0733F65 112608~|~1~|~1~|~01/NHS~|~Improve intersection of US-50 & State Line Road. This PID represents Ohio?s participation in this InDOT-sponsored project.~|~04 - Reconstruction - No Added Capacity~|~D80AC8A9BAA70A88588901EA2DE092EE74BCD99F 98463~|~1~|~2~|~02/S<2~|~Resurfacing inside the Kenton Urban Area. Work on SR 67 from 17.55 to the Urban Boundary at 17.87. Funds from the District Preservation Program budget. 80% federal STP funds SAC 4PF7 and 20% state funds SAC4PS7. There are no local funds in this split. Although, the road in this split is inside the Kenton Urban Area,it is outside of the City of Kenton.~|~05 - 4R Maintenance - Resurfacing~|~516B4A9072D7A215B357E286C785A2EA9E3E1FCE 98463~|~1~|~1~|~01/STR~|~Resurfacing outside the Kenton Urban Area. Work on SR 67 from the Urban Boundary at 17.87 to 24.79. All work on SR 273, SLM 5.66 to 6.31. Funds from the District Preservation Program budget. 80% Federal rural STP funds SAC 4PF7 and 20% State funds SAC 4PS7.~|~05 - 4R Maintenance - Resurfacing~|~3481177E1F44141F16CABB9B0E886C7CBE7C914C 102390~|~1~|~1~|~01/NFP~|~Raised Pavement Marker (RPM) contract for FY2022. Funded 100% state.~|~21 - Safety~|~DE565E5297D774BE35CDC9D4408C05AB19BC07BA 93004~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-SR 79-00.00 to 12.37~|~05 - 4R Maintenance - Resurfacing~|~2EA504F86C0632F60D28BE185E765017B7B75358 120034~|~1~|~1~|~01/S>2~|~Pedestrian improvements at Norton Middle School and Prairie Lincoln Elementary School~|~28 - Facilities for Pedestrians & Bicycles~|~0DF492D3104764EE72F38C4C5A9F20620043483C 125720~|~1~|~1~|~01/NFA~|~Piling Encasement For NOB SR 564 2.01 and various locations~|~13 - Bridge Rehabilitation~|~1158BFEAEE08103DA6E4B6D2472EB88EF920D3B6 121846~|~1~|~1~|~01/MPO~|~milling and resurfacing of Pennyroyal Road from south intersection with Clearcreek Franklin Road to SR 741~|~05 - 4R Maintenance - Resurfacing~|~0B52282CEAE5EBB307118144B0C7520ED8E80F96 108945~|~1~|~1~|~01/CMQ~|~Roundabout construction work eligible for federal-aid~|~17 - Construction Engineering~|~EA92F781A860288883E30907947A67B5CA7133BB 81748~|~1~|~3~|~03/NHS~|~NHS funding for bridge replacement with capacity (not BR eligible):SFN 2510928 FRA-270-22.94A~|~~|~08FC25ABF25EE7AF645616DDE1EB61ED320EE9AA 81748~|~1~|~2~|~02/NHS~|~NHS funded new bridges:SFN 2511061 FRA-270-23.69ASFN 2511053 FRA-270-23.54ANew Retaining walls 12 & 13 for new bridges~|~~|~1FAC81E35862BB02B2A9544E084D2FCA90D56897 81748~|~1~|~5~|~05/NHS~|~NHS funding for bridge rehab/no capacity (not BR eligible):SFN 2515962 FRA-315-12.20L - Wilson Run~|~~|~25D0DF5680588FFABD4C178ECA317C8359E250DB 81748~|~1~|~4~|~04/IMS~|~IM funding for bridge replacement without capacity (not BR eligible):SFN 2510839 FRA-315-12.15~|~~|~8EDC8A8A0F7EB0DF39B7B16C4C61C8819DFC245C 81748~|~1~|~1~|~01/NHS~|~NHS funded pvmt workMainline SR-315 work. I-270 CD ramp work due to adding capacity, retaining wall #14~|~~|~AF6EFA178624E45074ED3C12FBAB2DAAC953DD0B 107599~|~1~|~1~|~01/STR~|~Bridge 7203098 plan split~|~04 - Reconstruction - No Added Capacity~|~249FD7523A156817D17D4258C9F966071C125416 116858~|~1~|~1~|~01/NHS~|~Drainage improvements.~|~~|~33C5097832B72851CE495DE4D14BB0AF020D2282 122497~|~1~|~1~|~01/BRF~|~Structure replacement.~|~10 - Bridge Replacement~|~241EC8A4AF70DCB79C43A75575CE46B77E86DC06 119344~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~735C16D8AF1A5B06A1809E4DF9EF132D2999BFD6 124124~|~1~|~1~|~01/S5K~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~82A12FC1C2920C6B1318FDB414CD5A388714E9F7 124124~|~1~|~2~|~02/S5K/ZANE~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~280094A954B1D975551DD59D496D3621DB65C8C3 111314~|~1~|~1~|~01/SAE~|~Guardrail project on various routes in Adams County.100% HSIP funding.~|~21 - Safety~|~F5B283E8895E01243450086F7CB4D514230E417E 109144~|~1~|~1~|~01/NHS~|~Slide repair work funded by the Geologic Site Management (GSM)program. Funds needed over the GSM cap will be from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~F696BD38E58A4032E1022BFE2CD771CF3576E490 109144~|~2~|~2~|~02/NHS~|~Adding fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~1C8D3279DBB6F806EDB9BF77BA07CCA6A5E2078D 106199~|~1~|~1~|~01/NHS~|~D04 FY 2022 culvert repair/replacements.~|~04 - Reconstruction - No Added Capacity~|~8C9DB4E28F8FCEA10542FAE71FB5875D7951580C 106199~|~1~|~3~|~03/STR~|~D04 FY 2022 culvert repair/replacements.~|~04 - Reconstruction - No Added Capacity~|~6EF7B7631EB669829F24F5284B2522C6933E776F 106199~|~2~|~5~|~05/NHS~|~Replacing culverts.~|~04 - Reconstruction - No Added Capacity~|~0F74689F7C76612598E80048003FA9E7D5110ED1 106199~|~1~|~4~|~04/NFA/JEFF~|~Field paving of twin culverts on N Poplar St in the Village of Jefferson.~|~04 - Reconstruction - No Added Capacity~|~CEE097571CB8E72F799B67CA7E01AD947E7E7F48 106199~|~2~|~7~|~07/NHS~|~Aqua Ohio water line stabilization during culvert replacement.~|~~|~361FD2A1F9D699AF59E6864DED05DAD03CB5E1C0 106199~|~2~|~6~|~06/STR~|~Replacing culverts.~|~04 - Reconstruction - No Added Capacity~|~753FB5A24FCD5C1E144406C486DECF6F531C1A85 106199~|~1~|~2~|~02/S5K~|~D04 FY 2022 culvert repair/replacements.~|~04 - Reconstruction - No Added Capacity~|~870D2878D7914EE54B0B6FFB1A3005FF7C039442 103789~|~1~|~1~|~01/SAF~|~Safety Plan Split~|~~|~0D2ABC917E5252592372960B929C3334F9213B92 116630~|~1~|~1~|~01/STR~|~Reactive Paving.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B174D94388A310C413BCF879EAA8420C37E28376 113500~|~1~|~1~|~01/MPO~|~Install 8 ft. of sidewalk on both sides of Colerain Avenue.~|~28 - Facilities for Pedestrians & Bicycles~|~3E7E6706BFB77DAD5D9497C1E9BB5E3CE7FCA2D9 115383~|~1~|~1~|~01/BRF~|~TBD~|~10 - Bridge Replacement~|~C43167E7C1FD98FF4E8D45C2D5BD3A8C4FF53361 116573~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~966BA6E9C8D6A3977A3944BD235601FD3313E3F7 123242~|~1~|~1~|~01/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7D6438472C402F6A74948E9DC1238203CE57C89F 96375~|~1~|~1~|~01/S>2~|~Replace Bridge Deck SFN 1261258~|~13 - Bridge Rehabilitation~|~8302F19499B88AC8AB1BBEB113BFE9371498A8AD 94362~|~1~|~1~|~01/NHS~|~On US35, 1.20 miles west of SR327 junction, it is proposed to rebuild & stabilize the slope to stop the horizontal & vertical movement.80/20 split01/NHS/OT/State~|~99 - State Preventative Maintenance~|~213CB7F07C9E052AAAD3641642C6E3D020E9813D 116926~|~1~|~1~|~01/IMS~|~Deck Overlay~|~13 - Bridge Rehabilitation~|~0F1427594F25604C7050CB82504845602463B4A5 103259~|~1~|~1~|~01/IMS~|~District wide fast drying pavement markers.~|~21 - Safety~|~4678234BE34484A06646372501325088D01BAF2D 103259~|~1~|~2~|~02/S>2~|~District wide fast drying pavement markers.~|~21 - Safety~|~1A17BE18477106B28DFE680CB38F69677AB4E312 103259~|~1~|~3~|~03/S<2~|~District wide fast drying pavement markers.~|~21 - Safety~|~BDA445FA792F7451B2DC035058536E1742C7881E 103259~|~1~|~4~|~04/NHS~|~District wide fast drying pavement markers.~|~21 - Safety~|~9B99711214A5CD4CFE30D7C251191284865456BE 103259~|~1~|~5~|~05/STR~|~District wide fast drying pavement markers.~|~21 - Safety~|~99AF55134CC219559AE026381496CCC3262499BB 103259~|~1~|~6~|~06/NFP~|~District wide fast drying pavement markers.~|~21 - Safety~|~F320E21AE47BC9784735B4029BB029DC0C400446 89459~|~1~|~1~|~01/IMS~|~Plan Split for SFN 7803753 TRU IR 80 0357 and SFN 7803788 TRU IR 80 0401~|~~|~2B0EE490B9BE9E2D1DB6832A8C740896C3316365 99333~|~1~|~1~|~01/ENH~|~test~|~05 - 4R Maintenance - Resurfacing~|~95B4632C7D8D5D258EEE2CC2AB705B21C1BD4A91 120365~|~1~|~1~|~01/NFA~|~NEVI RD2 71-B~|~63 - Electric Vehicles & Charging Infrastructure~|~D79C5BF9055A59B295431A13CC784F62F8E5C2BB 121269~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3BEE808AC6F893F035FD0535F89DF3145D802AAA 121269~|~1~|~2~|~02/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~22889516FE3A49BB007BFA6A2937EB30C3942A23 113718~|~1~|~2~|~02/SAF~|~Part 2 - Rectangular Rapid Flashing Beacons and pedestrian refuge islands on Cleveland Avenue ~|~21 - Safety~|~BA368F3D50B6D0BD2CAEAEC99C0398E6A7C68672 113718~|~1~|~1~|~01/SAF~|~Part1 - Reducing lane widths, installing raised medians, enhanced and mid-block crossings and lighting from Huy to Cooke in Columbus.~|~21 - Safety~|~49E683EE2ED04774774935036CFA5AA039CBDB27 99600~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~125039091ADB95E19D726A6B405378EEFE01F1BB 126323~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~B998168B4D5EBAE3C47E58BE61F351C164AE41D4 111202~|~1~|~1~|~01/SAF~|~Various pedestrian improvements in North College Hill including curb bump-outs, RRFB?s, new signage and markings, and other pedestrian improvements.~|~21 - Safety~|~9C89E86EAA5434298AFA562643EB5F2E6097B261 122355~|~1~|~1~|~01/S>2~|~Urban Paving Eligible Scope: milling, resurfacing, striping~|~05 - 4R Maintenance - Resurfacing~|~F38E19711B9FF1D4B77E37574B37789D1DB56C43 122355~|~1~|~2~|~02/S>2~|~Locally funded scope, such as full depth repair, curbs, ramps, walks, etc.~|~05 - 4R Maintenance - Resurfacing~|~A0DEF8075922B001D40CBD9FD92569A4A985883E 113527~|~1~|~1~|~01/MPO~|~TLCI eligible funding: multi modal/complete street items including sidewalks, ped heads, striping enhancements~|~28 - Facilities for Pedestrians & Bicycles~|~1BE8DC83702B48F28169133C47700FBCC33FF425 91557~|~1~|~1~|~01/BRO~|~Replace existing boxbeam bridge (COL-170-0469, SFN 1504444) with a new bridge. The most feasible alternative in terms of structure type will need to be established in Part 1 of the design process.~|~10 - Bridge Replacement~|~983AEE2ABC47500183DC8D0AC974722A78C794D9 89039~|~1~|~2~|~02/NFP~|~100% Local participation on work items that are not eligible for federal-aid.~|~13 - Bridge Rehabilitation~|~94A1F0AD99353158D5659C16AB5A90110DD67F5A 89039~|~1~|~1~|~01/BRO~|~Work eligible for federal-aid MPO STP funding~|~13 - Bridge Rehabilitation~|~F46415E031B88CDFC97A1972FBB7B9FE89BE944A 121162~|~1~|~1~|~01/STR~|~All work is within this split~|~05 - 4R Maintenance - Resurfacing~|~A14E080102787B9D1A3D66C2C7A0997B1C60507D 110868~|~1~|~1~|~01/S<2~|~"01/S<2/BR/ " - 80% Federal (4FP7) and 20% State (4PS7) - replacement of structure.~|~10 - Bridge Replacement~|~A657AD09216F0C2AE22E9EBCBAAE8B97509419F4 109344~|~1~|~1~|~01/NFP~|~Culvert work in Tar Hollow State Forest.~|~04 - Reconstruction - No Added Capacity~|~8C4AF348688DC35C411CB822CAAB01426A4197D7 13603~|~1~|~2~|~02/BRO~|~Pay items that are 100% local participation.~|~13 - Bridge Rehabilitation~|~664D1AE04EA9711C28D50763F60D6A64A30FD7F6 13603~|~1~|~1~|~01/BRO~|~80/20 fed/local funding split for all work using federal BHF funds.~|~13 - Bridge Rehabilitation~|~86D59770DE03026C83835AA138F76A0DC49DB23C 109298~|~1~|~1~|~01/SAE~|~Upgrade existing guardrail~|~21 - Safety~|~F287A7D1054C6FD8DE7BA23B321E71A762F64680 100793~|~1~|~2~|~02/S>2~|~Chip sealing of TRU US 62A from 0.00 to 0.36.~|~05 - 4R Maintenance - Resurfacing~|~F163F7B47CB30D180405689DE0DCC58B8F1F81F5 100793~|~1~|~1~|~01/STR~|~Chip sealing of the following routes: ATB SR 193 0.00 to 2.47, ATB SR 534 0.00 to 7.69 and 7.77 to 12.10, TRU SR 88 19.11 to 22.76 and TRU SR 88A 0.00 to 0.04.~|~05 - 4R Maintenance - Resurfacing~|~975D96C2B2140E4A4B80AA723AB61300E2A2175A 124951~|~1~|~1~|~01/MPO~|~Plan split for OKI resurfacing pilot program eligible expenses~|~05 - 4R Maintenance - Resurfacing~|~8BBCE7CD2A58E975C1AEE800D48180C2D13C138B 114523~|~1~|~1~|~01/S<2~|~Urban Paving plan split~|~05 - 4R Maintenance - Resurfacing~|~632859A0411B3A9103E4DFE5FAEBE5C287C1D485 100584~|~1~|~1~|~01/STR~|~Chip seal of HOL-514~|~05 - 4R Maintenance - Resurfacing~|~8F5904A8A2E94EADA453A9D35515D5B957565FC3 75732~|~1~|~2~|~02/NHS~|~Bridge maintenance on 3 bridges within the project, mainly bridge sealing:Mainline US 35 over Jasper Road:Left: SLM 13.54, SFN 2900408Right: SLM 13.54, SFN 2900416Overhead bridge carrying Brickett Rd over US 35:SLM 14.45 SFN 2900432 ~|~~|~BC84B5FF881BDDF9DA05C239D31179A5C7A1DB52 75732~|~1~|~1~|~01/NHS~|~Rehabilitate a portion of US 35 in Greene Co.; From 0.02 miles east of US 68 to 0.05 miles west of N. Bickett Rd. ~|~~|~E5C40759332D6C017FCED61CA42F6920F225B2D9 120547~|~1~|~1~|~01/STR~|~Interchange improvements along SR 149 at the I-70 Interchange~|~03 - Reconstruction - Added Capacity~|~3A37DE70637AA1884D5877F939A7F4DF8B4AAE97 120547~|~2~|~2~|~02/STR~|~Interchange improvements along SR 149 at the I-70 Interchange~|~04 - Reconstruction - No Added Capacity~|~40EA583FE2DE195CB6DAECC788BC6E96D44FC4E0 120547~|~3~|~3~|~03/IMS~|~Interchange improvement along I-70 to reconstruct and lengthen the I-70 bridges over SR 149, to allow for widening of SR 149 under the bridges, including incidental roadway work along I-70.~|~10 - Bridge Replacement~|~AFD322DB0858F0535651D4658F9BF399A50807C4 120547~|~4~|~4~|~04/STR~|~Relocation of Sanitary and Water Lines along SR 149 ~|~43 - Utilities~|~A6E4F6A561DD0216B9546AF5BCE3BC3F16B7D9A2 120547~|~1~|~5~|~05/STR~|~Waterline relocation using State funds~|~43 - Utilities~|~833EE4698E305EF9B2CDC367828B1FD2FBE867A0 107417~|~1~|~1~|~01/ENH~|~Rehabilitation of Pullman Car with 95% federal/5% local funds. Federal funds are TAP (4B37).~|~44 - Other~|~F0D9F4F2652DFC1C61564A0533741AB580157E29 105243~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~3628D383435F9178601CB3405865CB18483A71FC 105243~|~1~|~2~|~02/STR~|~Minor bridge work 10' to 20' span, includes ADA curb ramp reconstruction and catch basin reconstruction.~|~04 - Reconstruction - No Added Capacity~|~26A5401796D5464152A5FE0AF9C24AA967FCAAF4 121380~|~1~|~1~|~01/NFA~|~Perry County Engineer's FY2029 guardrail project funded by CEAO - 4HB7 @ 100% capped at $150,000.~|~21 - Safety~|~1DBB876A959BF2E258D213B624B30799D3696BA6 111285~|~1~|~1~|~01/SAE/GCEO~|~Guernsey County Engineer's FY2024 pavement marking project funded by CEAO. 4HB7 - see cap comments.~|~21 - Safety~|~E172F9FB161E166D6D1CCC76884189C2CCA54B80 111513~|~1~|~1~|~01/MPO~|~TMACOG funded items~|~17 - Construction Engineering~|~2F1598F7AD388AA296A6B1C2785BE0DD922F8A0F 92982~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - Resurfacing with related work on: 1) Cos-SR 541-00.00 to 08.59; 2) Kno-SR 541-00.00 to 08.92; 3) Cos-SR 60-07.58 to 07.71~|~05 - 4R Maintenance - Resurfacing~|~8A548AE36FE7DB0798E95AADBD08D0677A82280B 112259~|~1~|~1~|~01/STR~|~General split. Will add more descriptive splits once bridge locations are determined.~|~47 - Bridge Preventive Maintenance~|~262081318722FC36AF54EF1B8A8E54E905F1AF3C 113208~|~1~|~1~|~01/IMS~|~Construct new noise wall along IR-77 between Waterloo Road and Lovers Lane in the City of Akron.~|~20 - Environmental Only~|~FEF2296C50DB6D78E2709DAC23C0D3EAA7A07FCE 123869~|~1~|~1~|~01/S>2~|~Intersection Improvement~|~21 - Safety~|~DCE6D3B354CA8A44D3A968C8498FF282496F57E4 126067~|~1~|~1~|~01/STR~|~Plan split for chip seal~|~99 - State Preventative Maintenance~|~16B89A0E5B5B6FB9F252CBDAAA93330562EE7ACF 116797~|~1~|~1~|~01/NHS~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~69AE77A884BEE25A7F8F1B748301C3D9C47A6F65 94548~|~1~|~1~|~01/NFP~|~Guardrail repair and replacement througout six counties.~|~21 - Safety~|~831F52BD9FE2EF76139AE44B09F1CA6608CC719D 114825~|~1~|~1~|~01/NHS~|~NHS plan split for PIC-762-11.18-14.89~|~05 - 4R Maintenance - Resurfacing~|~ADEB50DD89626FF68F138FE692B61B1B7057A35D 86940~|~1~|~1~|~01/STR~|~Plan Split for TRU SR 87 13.42 to 22.36~|~~|~F00F611E58E821BBDDEB45758BC535A45002B6F9 123671~|~1~|~1~|~01/NHS~|~Deck Replacement.~|~13 - Bridge Rehabilitation~|~6315775D71217A4B37F93820C0A39D109F568C9B 126812~|~1~|~1~|~01/NFP~|~ODOT TID funding~|~44 - Other~|~4A09EEC32C5A6C964588A22F97BE7F7E2FC063B4 108457~|~1~|~1~|~01/ENH~|~Main Plan Split~|~31 - Landscaping & Other Scenic Beautification~|~2B5041F1FA25175148B227E2FBFB43309B6D9B5E 111123~|~1~|~1~|~01/BRO~|~Bridge Replacement of SFN 855205~|~10 - Bridge Replacement~|~650AF0846A8E74D8723120804AA2713A312F5501 116410~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~7859C83FDDB85BFEFB0B25B6E83E88B29C5F62E4 115821~|~1~|~1~|~01/SAF~|~Safety project.~|~21 - Safety~|~515596F508DF7CBA7F178A6435FF0635E9F69A9B 123568~|~1~|~1~|~01/SAE~|~Placing R-W/R striping. Routes TBD~|~21 - Safety~|~4D0AF0F1564421B68711CD85FCBB2ECDB59F28DC 114600~|~1~|~1~|~01/STR~|~Overlay on HIG 506.~|~05 - 4R Maintenance - Resurfacing~|~86CC33075855B77D08E156C8A6EA75894A80E465 110387~|~1~|~1~|~01/STR~|~Ac Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~CED9F56DF03889CAA5A448B74DD65AFC844443FB 110387~|~1~|~2~|~02/S<2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~CB924838C13A4C2C01B6B827FD21B1D0E61EB893 107822~|~1~|~1~|~01/NHS~|~All work on US 42.~|~04 - Reconstruction - No Added Capacity~|~60F24212968D426C74131B86D2AC3AFEF7955820 107822~|~1~|~2~|~02/STR~|~All work on CR 1 & CR 22~|~04 - Reconstruction - No Added Capacity~|~F3CA523CEBDC9F5732BF669E8FACD1EA9D203750 126141~|~1~|~1~|~01/IMS~|~Bridge Block Funding~|~47 - Bridge Preventive Maintenance~|~439380C9B2114CB0CB4E87D03DCFD06E5B17D3D5 25189~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - No CAP - Cos-SR 93-12.67 to the 26.72 - Treatment consiists of 10% Surface Repair; 1-1/2" mill; 3" overlay~|~05 - 4R Maintenance - Resurfacing~|~1E17180CCCDC5466083B1A2BC73F717798D779BB 106272~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split: FRA-40-13.50-15.71~|~05 - 4R Maintenance - Resurfacing~|~460878BEA203CC42C5E538107FB9F6245613F92D 102209~|~1~|~1~|~01/NFA~|~LAW CR 6 7.74 ER Slide Project.~|~44 - Other~|~B1D248A939667B56A7E3FECF76FB2A061B9D8BE6 101454~|~1~|~1~|~01/STR/MILL~|~DSR# HOL-006~|~04 - Reconstruction - No Added Capacity~|~FECAA37FD50A1851BD58900C25529C18BF77A0A8 94300~|~1~|~1~|~01/CMQ~|~14 signalized intersections along US-22/SR-3, Cooper Road, and Main Street, within the City of Montgomery corp. limits.~|~21 - Safety~|~5343DC4F8B7AFC3FBA83817599345BD37533674B 91740~|~1~|~1~|~01/NFP~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 26 17.91-21.65 and MOE 260 5.52-11.32. Non federal aid route, funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~19F4A8AC2340915EBC32D3AEB5E362A7A1394659 91740~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 260 4.33-5.52 and NOB 285 5.36-14.47.~|~05 - 4R Maintenance - Resurfacing~|~B49DCD8AAA6C6F66F644B8654B96EDF7C1885331 96409~|~1~|~1~|~01/NFA~|~Install new and upgrade existing guardrail on various routes and sections in Noble County. Funded 100% federal.~|~21 - Safety~|~2D2ABCFBB61E07238F93335A1591C748056FFAAE 106746~|~1~|~1~|~01/MPO~|~Work to widen the paved shoulder to improve the Amish buggy travel that qualifies for federal-aid.~|~21 - Safety~|~0E3107D80D0B91B36971BA8759FAE8AE79BF48D0 109581~|~1~|~1~|~01/SAF~|~Work at the intersection of SR 317 and Lockbourne Rd~|~21 - Safety~|~60884B7F922F9A4E09056EA6123BB433D9C02E1E 106236~|~1~|~1~|~01/IMS~|~Repair sink hole and undermining of soils on IR 75 in Auglaize County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C5A547EC836DAE0836774248D38D41318E4A60F 93202~|~1~|~1~|~01/STR~|~General system paving of UNI-739: 6.06-14.13~|~05 - 4R Maintenance - Resurfacing~|~4CC39AC82006A9D290D881DCB59D5BDAE15A4DCC 113118~|~1~|~1~|~01/NFP~|~The Medina County Port Authority will administer the construction of a 1,500-foot extension of Commerce Parkway to assist the Infinium Wall Systems Project.~|~44 - Other~|~01A04A9C95425C105245C10B2F8D78F6EAD11518 98643~|~1~|~1~|~01/BRO~|~SFN 0600067, AUG-29-0402 over Miami & Erie Canal - Remove deficient concrete filled arch structure. Investigate possible use of twin conspan replacement.~|~10 - Bridge Replacement~|~2D2839C5B6DD0A08E8F505C3C4E9FAF49FA8603C 91826~|~1~|~1~|~01/IMS~|~Plane and Pave a portion of IR 71 in Hamilton County from SR 562 to SR 126. Highway signs will be included with this project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~40EE2E15256B02C6234DEDB3F88C076C6A61B8E2 91826~|~1~|~3~|~03/SAF~|~This work will consist of widening northbound IR-71 from the existing northbound exit to Ridge Road to the northbound exit from IR-71 to Red Bank Road. As part of this widening, the northbound entrance ramp from Kentucky will be reconstructed to pass between the pier and abumtnet of the Kentucky overpass over IR-71. A large retaining wall is anticipated as part of this work along northbound IR-71 from north of Kennedy to the exit ramp to Red Bank. Wrong way signage.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E7676AE2A8A5F6A479DB8BA0227189215467E1E 91826~|~1~|~2~|~02/IMS~|~Includes work on the following bridges: HAM-71-0875/SFN3115283, HAM-71-0970L/3115313, HAM-71-0970R/3115321, HAM-71-0991/3115364, HAM-71-0992/3115372, HAM-71-1068LR/3106888/3106896, HAM-71-1181L/3106969, HAM-71-1181R/3106977, HAM-71-1277L/3107027, HAM-71-1277R/3107051~|~13 - Bridge Rehabilitation~|~98DAF69D4890EDBDC03406EB1D0EEE98E0DA832F 126638~|~1~|~1~|~01/ENH/TRCE~|~Construct new sidewalk.~|~28 - Facilities for Pedestrians & Bicycles~|~F680F49BC6F8DAE05F007D5C957636EEF37BA595 113152~|~1~|~1~|~01/BRF~|~Replace structure > 20' span.~|~10 - Bridge Replacement~|~D6037FAB4F2DF7657D5D597ABD14DFDEA03DDC81 115604~|~1~|~1~|~01/STR~|~Construct a center turn lane and improve 2,200 linear feet of SR 60 to support an industrial park. ~|~44 - Other~|~6A7356B9BF2C1D3A19BEF69AF3D66C1233EECF8C 94395~|~1~|~1~|~01/STR~|~General System Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~211D1D8193EA3B72CEBBBEE1F95B1F85E1A01294 122966~|~1~|~1~|~01/MPO~|~Plan Split 1 for HAM Plum St. project. 55/45 ODOT/Local (SAC 4TA7/LNTP)~|~04 - Reconstruction - No Added Capacity~|~FAF11073B98C2EECE024D9C411405525883DED55 87190~|~1~|~2~|~02/S<2~|~This split is for the portion of the project that is inside the Lima Urbanized Area. Although, the section is inside the Urbanized Area it is outside of the City of Lima. Therefore, there are no local funds in this event. The split cover SR 117 from 10.77 to 12.73.~|~05 - 4R Maintenance - Resurfacing~|~09D4731F598EA85392528D8E6BC4B40F1DB953B6 87190~|~1~|~1~|~01/STR~|~This split is for the portion of the project outside the Lima Urbanized Area which is SR 117 from 3.25 to 10.77.~|~05 - 4R Maintenance - Resurfacing~|~1AA13A8EA847A62701E4CF148054908CE9E49758 116751~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~93FDF47EC0DD7DE11AA8DB52D269B8FD1BBCDBC3 95974~|~1~|~1~|~01/NFP~|~Demolish salt dome and build new 3000 ton cap salt building.~|~01 - New Construction~|~4CFAAED4053903417994F4B5E80B10724078E201 112473~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - Plan Split 1~|~21 - Safety~|~68084A888A6127B2AEB6314F6B05F2152AE153D3 117815~|~1~|~1~|~01/STR~|~Culvert replacement~|~66 - Resilience Improvement - Highway Project ~|~ACEAF39C1D7C33D6200834BED823AC0EF2BCFC83 93026~|~1~|~1~|~01/NHS~|~LUC-US20 (Reynolds Rd) island improvements...~|~31 - Landscaping & Other Scenic Beautification~|~AEB1DDFF0847ECA03A3C4EFC07F8D6A0B71FCB95 102149~|~1~|~1~|~01/STR~|~SCI SR 73 19.63-21.01~|~05 - 4R Maintenance - Resurfacing~|~3EF357D5B23B0ADC210DD1036236B955B97233B0 102149~|~1~|~2~|~02/S<2~|~SCI SR 73 21.01-24.84~|~05 - 4R Maintenance - Resurfacing~|~88BE70A80C0DAE418F7D88208C8BD4C93D73B09A 102149~|~1~|~3~|~03/S<2~|~Replace Joints.~|~47 - Bridge Preventive Maintenance~|~CAEAE86991A1947AE5B7A4E168CD787F69382AF9 102149~|~1~|~4~|~04/SAF~|~SCI 73 6.38-20.71 Low-cost safety improvements on two curves including surface treatment, signing and rumble stripes.~|~21 - Safety~|~77FE7CBB144ECFB3DFC981901155E521E7F9F18C 91712~|~1~|~1~|~01/BRO~|~Bridge deck replacement. HOC 180 00.42 (SFN 3702707). Includes substructure work. BR eligible, funded 80 federal/ 20 state.~|~13 - Bridge Rehabilitation~|~44D8FFF1D94EADBF322317EC3D944E00936BEE66 114126~|~1~|~1~|~01/STR~|~Culvert replacement at HOL-3-0.72~|~04 - Reconstruction - No Added Capacity~|~18D10AB030A41E245B771624E8E9FCFF28C8B52B 122421~|~1~|~1~|~01/MPO~|~Plan split for path construction.~|~28 - Facilities for Pedestrians & Bicycles~|~BF0353DCDDD2447D301B15040864C7B62C932948 92706~|~1~|~1~|~01/MPO~|~Resurfacing CR 605 4.53 - 5.58~|~05 - 4R Maintenance - Resurfacing~|~52876BDA5B0954A3B6777F8F214EFD3126BC24DE 122384~|~1~|~1~|~01/S>2~|~Improvements to the intersection at Mastick Road and Puritas Ave. with pedestrian countdown timers, and signage ~|~21 - Safety~|~7C475D33C329DB20A9CF36C506EA4F9B042CBCE2 119585~|~1~|~1~|~01/NHS~|~Construct roundabout at SR 241 and Shuffel St.~|~21 - Safety~|~8E55DD56F39F30FB101B6EFA019B2B23C4FA73C6 119585~|~1~|~2~|~02/NHS~|~Pavement reconstruction, bridge replacement 10' to 20' span, includes culvert replacements and drainage work.~|~66 - Resilience Improvement - Highway Project ~|~60A48B132D6D7E9538972C49DC4E4B3664D4FA0D 119585~|~1~|~3~|~03/NHS~|~Resurfacing slm 17.43-17.94~|~05 - 4R Maintenance - Resurfacing~|~ED55554502B87124EC1FE043868C9307F1A09A85 119585~|~2~|~4~|~04/NHS~|~Resurfacing 14.65-16.86~|~05 - 4R Maintenance - Resurfacing~|~BA45CAC401B63B0023932B36A1C12C781BA3BEFB 119585~|~2~|~5~|~05/NHS~|~Bridge preventive maintenance structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~B85B95736E6D267E7C9CD17CCE6F37E922B460C3 96131~|~1~|~1~|~01/NFA~|~Construct a new equipment storage building at a new Montgomery County Outpost Facility.~|~44 - Other~|~5A9384A005BC0FF31BA19A74D8CE9920204BE90E 123688~|~1~|~1~|~01/NFA~|~Adena Road is not on the federal aid system.~|~04 - Reconstruction - No Added Capacity~|~64F354DAA6B6B9545CD2E5E0F9DA71C9D3D9F7EC 101417~|~1~|~6~|~06/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~5578F8AC8BA2FA073127B36B42B2D0D3A26497D3 101417~|~1~|~7~|~07/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~0F2AC79DDB20A6006423B624E5B3D6F85BAFB45E 101417~|~1~|~1~|~01/S>2~|~Resurfacing, utilizing major rehab funds.~|~05 - 4R Maintenance - Resurfacing~|~3C93ACCD7E0DC1758FF24EE38E32A42450A4BFB0 101417~|~1~|~3~|~03/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~57B030279BA5A7CB50FEFF6686BE5DF61B38F43A 101417~|~1~|~4~|~04/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~377F38E1DC0ACDC056DC36B1B92CBA3938714462 101417~|~1~|~5~|~05/NHS/CANF~|~Resurfacing, urban paving in the City of Canal Fulton.~|~05 - 4R Maintenance - Resurfacing~|~C0E385D8407C7652125B865DBD363EF4F2A6BB5C 101417~|~1~|~2~|~02/S>2/MASS~|~Resurfacing, urban paving City of Massillon.~|~05 - 4R Maintenance - Resurfacing~|~09AC635941749272BF9DE748B9F3CB1AC4C0DD7F 101417~|~1~|~8~|~08/NHS/CANF~|~Full and partial depth pavement repairs, includes installing ADA curb ramps in Canal Fulton.~|~05 - 4R Maintenance - Resurfacing~|~5E7C2638523C2CC548CE7B40B697EDFDADE76E48 101417~|~1~|~9~|~09/S>2/MASS~|~Full and partial pavement repairs, install ADA curb ramps in the City of Massillon.~|~05 - 4R Maintenance - Resurfacing~|~4C2C4099240D9A2E567D1D77CA3DD03348F6A0E1 101417~|~1~|~10~|~10/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0F16EF5CD6738D6D18500C5ACF1F376EFEEC150B 93990~|~1~|~1~|~01/BRF~|~Replace SFN 3937003 on TR 114 (Ridge Road) over the East Branch of the Huron River~|~10 - Bridge Replacement~|~3CCBDEF48F4AF5BA3FB687D5838B71F71155C17D 107882~|~1~|~1~|~01/STR~|~Landslide repair project. ATH 550 14.95-14.99. 100% Federal ER funds before 08/12/2018.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7D1050EEF9E40C28D8B70DBF16AB889DF581E314 106288~|~1~|~1~|~01/STR~|~Resurfacing on county road~|~05 - 4R Maintenance - Resurfacing~|~005A74ABECF38E2ADB131CB9BC552954562C5A0A 106288~|~1~|~2~|~02/S<2~|~Urban Portion of Project~|~05 - 4R Maintenance - Resurfacing~|~F164BBFD6F5EC5F8338399C771D051436A42971E 100239~|~1~|~1~|~01/NFP~|~Chip seal MAH SR 165 from 1.65 to 5.46, SR 534 from 0.00 to 4.48, POR SR 225 from 10.74 to 15.76.~|~99 - State Preventative Maintenance~|~7867A3DA23637A70C263FCD00BBA190D613C6C9F 88677~|~1~|~2~|~02/S>2~|~Minor rehab of the pavement on US 50 from Tusculum Ave. to the ramp to Eastern Ave. This Planning Split is for the Urban portion of the project. This portion is between SLM 27.64 to 28.47~|~05 - 4R Maintenance - Resurfacing~|~69A61F6705BD99EADE47A342A18DF64EA267FC44 88677~|~1~|~1~|~01/NHS~|~Minor rehab of the pavement on US 50 from Tusculum Ave. to the ramp to Eastern Ave. This Planning Split is for the NHS portion of the project. This portion is between SLM 26.16 to 27.64~|~05 - 4R Maintenance - Resurfacing~|~74AC65440B739B84C9872B5675670B28121387DA 114782~|~1~|~1~|~01/IMS~|~Project to Paint bridges GRE-675-0059 that carries Feedwire Rd over I-675 and Bridges GRE-675-0512L/R that carrie I-675 over Patterson Rd. ~|~13 - Bridge Rehabilitation~|~785AA72FBC89DDB594D662BB2A7DF2614D11294F 117283~|~1~|~1~|~01/S>2~|~Resurfacing project in Ironton.~|~05 - 4R Maintenance - Resurfacing~|~BF74F5644ED6E739DFFC524CF63CE7CB55570AF5 114696~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~DB52A16E7A9A761EBC9615E8CFB83D2D3A67DF4B 114411~|~1~|~1~|~01/SAE~|~Upgrade existing pavement markings on various county roads.~|~21 - Safety~|~996E57EB833BEE2FD2789B5C339618DB3485D992 91668~|~1~|~1~|~01/MPO~|~Various sections of the LMR Scenic Trail, Xenia-Jamestown Connector, Creekside Trail, and Wright Brothers Huffman Prarie Bikeway Proposed improvements include: addition of 2" of asphalt over the existing surface, installation of a 3' topsoil berm against new pavement with seed, fertilizer, and mulch, and application of thermoplastic pavement markings with silica sand for skid resistance on sections of the LMR Scenic Trail, and correction of a 100' section of uneven pavement on the Creekside Trail between Hawkins Road and the James Ranch Spur, correction of an uneven section of path on the LMR Scenic Trail between Hedges Run and the Glady Run Spur, filling of pavement cracks on all paths, and sealcoating of all asphalt sectios of paths with an approved agricultural bio-based road treatment product.~|~28 - Facilities for Pedestrians & Bicycles~|~9B38904F7DEE4E427E1C9FA7DAD05123C6B263D1 81723~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on JEF-7-26.49 to 31.04; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~F46CDF0C6A057DDC37C635B2FB02004DBD91595D 113028~|~1~|~2~|~02/S>2/MASS~|~Resurfacing, urban paving in the City of Massillon.~|~05 - 4R Maintenance - Resurfacing~|~C49D95234EFF5679F5A2ECE64AA62457F095FD0D 113028~|~1~|~1~|~01/NHS/MASS~|~Resurfacing, urban paving in Massillon.~|~05 - 4R Maintenance - Resurfacing~|~DA2E81D071A6C01A810AFA4740A75AD37D9087C5 113028~|~1~|~6~|~06/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~7441854648EF4F1A46167128318213D6D5CA2588 113028~|~1~|~7~|~07/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~059B256853FFD25BD90741D2C6CDD5F69A120EC9 113028~|~1~|~5~|~05/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~CC8E5561CE52E4237EDB6151732CE98E240192A5 113028~|~1~|~4~|~04/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~1E11742A2E3AED941FD76C5B734E9710E50EE67D 113028~|~1~|~3~|~03/NHS/MASS~|~Partial depth pavement repairs in Massillon.~|~04 - Reconstruction - No Added Capacity~|~EF6F31D28031CF1EC7DEF8D5E5CC11239E4EE8C8 97765~|~1~|~4~|~04/BRF~|~Bridge replacement project. ATH TR129T 3.32 (SFN 0545538). Funded through the OBPP.~|~10 - Bridge Replacement~|~0AF5B29978D052D760A35DC86EBD80FE4A95A515 97765~|~1~|~1~|~01/BRF~|~Bridge replacement project. ATH CR17C 0.12 (SFN 0550108). Funded throught the OBPP.~|~10 - Bridge Replacement~|~4542D29E2AA811C6A11C3F866840F286842CE4E8 97765~|~1~|~2~|~02/BRF~|~Bridge replacement project. ATH CR48C 1.15 (SFN 0537837). Funded through the OBPP.~|~10 - Bridge Replacement~|~4F9F3199BB3D7DDB246B380D1F80557AFF9D953E 97765~|~1~|~3~|~03/BRF~|~Bridge replacement project. ATH CR90C 4.05 (SFN 0546429). Funded through the OBPP.~|~10 - Bridge Replacement~|~B6F3292C67E2A0EF831D3ADF04A9013F3619D4E2 109991~|~1~|~1~|~01/IMS~|~Heat straightening beams underneath linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~AB14AE79959E17297CECA22A23D2E95B79FFE40B 127075~|~1~|~1~|~01/NFP~|~Plan split for annual traffic signal repair, replacement and installation contract~|~21 - Safety~|~BCECA8837F8510858567CFA9F5583CECCF24BF15 112929~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-71-17.97-25.62~|~05 - 4R Maintenance - Resurfacing~|~EFC80011E57F682312B477C04E598270C2C8FB80 100853~|~1~|~1~|~01/STR~|~AC overlay with repairs on DAR SR 121 SLM 0.00 to 4.74.~|~05 - 4R Maintenance - Resurfacing~|~8569C2F6BCB58A3E8C2A7C4E1AB425ACC3679953 100853~|~2~|~3~|~03/S<2~|~Resurfacing a portion of SR 121 & SR 320 in Preble County. Work includes pavement repair, planning and new asphalt overlay and all necessary traffic control.PRE-121 0.57 - 0.69PRE-320 1.66 - 3.12~|~05 - 4R Maintenance - Resurfacing~|~13377D52C9FE419CBEF65B051D612D2A0F19C2AE 100853~|~2~|~4~|~04/STR~|~Bridge rehab on rural bridges.~|~13 - Bridge Rehabilitation~|~F8CDCEFED7B421B9993A774801E9440DA1672752 100853~|~2~|~5~|~05/S<2~|~Bridge rehab on small urban bridges.~|~13 - Bridge Rehabilitation~|~118D5DD8108042AB0321A7A0DFC073D380733E5F 100853~|~2~|~2~|~02/STR~|~Resurfacing a portion of SR 121 & SR 320 in Preble County. Work includes pavement repair, planning, new asphalt overlay and all necessary traffic control items.PRE-121 0.00 - 0.57PRE-121 1.96 - 5.97PRE-320 0.00 - 1.66Asphalt overlay on SFNs 6801846 and 6801781.~|~05 - 4R Maintenance - Resurfacing~|~CD1F50C74C34086D425E21EB5A4DDAD1AE9EE8FB 122218~|~1~|~1~|~01/STR~|~Conduit replacement.~|~04 - Reconstruction - No Added Capacity~|~C393EFAF15373159E09A78F0E437A77FFB866398 125495~|~1~|~1~|~01/SAE~|~All work included in this plan split.~|~21 - Safety~|~8B5A4C8B6980E30345C393DDEBAD1DB8C70C1B43 107952~|~1~|~1~|~01/STR~|~SEN-224 from SLM 0.00 to 10.255~|~05 - 4R Maintenance - Resurfacing~|~4C52E097A862FA1555FB87E29055AC315E66F862 107952~|~1~|~2~|~02/S5K~|~SEN-224 from SLM 10.255 to 10.645~|~05 - 4R Maintenance - Resurfacing~|~FBA10538A68A332330481BB567F1A772B5FAB048 115921~|~1~|~1~|~01/BRF~|~All work in this bridge rehabilitation project. 95% federal funds through the Municipal Bridge Program. The non-federal match and all funds needed after the cap is reached will be provided by the City of Lima.~|~13 - Bridge Rehabilitation~|~EF987940B5A00F348B85D493A2BAE88929ABFE37 107695~|~1~|~2~|~02/NHS~|~Resurfacing a portion of SR 4 in Butler County. Work includes pavement repair, planing, new asphalt overlay, and all necessary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~C3FA19AD2C73E9A124D3826502D6DC917A2A1DAA 107695~|~1~|~3~|~03/NHS~|~Plan split for the replacement of the BUT-2-1488R bridge.~|~10 - Bridge Replacement~|~80903D134D573D7081153B4FBC869F1D9F4C3389 107695~|~1~|~1~|~01/NHS~|~Bridge maintenance on bridges BUT-4-1480L & BUT-4-1480R.~|~13 - Bridge Rehabilitation~|~AEFDAC68FF3CC3126EB933755C503C0CB095CD96 111340~|~1~|~1~|~01/IMS~|~Rebuild lighting system and patching on retaining walls~|~44 - Other~|~068128E8A1C7157F80D57B3E7924BF1BAE9E5357 111340~|~1~|~2~|~02/SAF~|~Repair damage from vehicle accidents~|~21 - Safety~|~873D9E90D57FE959C7702783A6F3D975F834107D 105153~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding -4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of two structures on PER SR 37 at 16.95 (SFN 6401083) and 19.35 (SFN 6401172).~|~10 - Bridge Replacement~|~28F0BCD081707C8467F8EC127AA428121A822698 102638~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 374 0.00-3.72. Rural federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~3931C7BFC617D10C6FAF15D2F69B7706C8538925 124701~|~1~|~1~|~01/BRO~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~0D50E9629FF50C9ACCD390CEEC2AE1D250661510 96835~|~1~|~1~|~01/NFP~|~Work to replace the bridge. 80% state funds SAC 4C87 and 20% local funds for the construction phase. The County Engineers Association of Ohio (CEAO) and ODOT approved the project to be part of the Federal/State Exchange Program. The 20% non-federal match is provided by the Putnam County Engineer.~|~10 - Bridge Replacement~|~257AB908A7DEFB8FC923ECE9A9EB9ADF41D876D6 105461~|~1~|~1~|~01/NFP~|~Non federal aid~|~05 - 4R Maintenance - Resurfacing~|~C9B031FE6B6A564C4E6AB1C77F541EC67C79EE51 105461~|~1~|~2~|~02/STR~|~STP Rural - SR 47~|~05 - 4R Maintenance - Resurfacing~|~5FAD3CA412C5F4FC0F322D4B8F16187380DCBA5E 109520~|~2~|~3~|~03/NHS~|~Intersection improvement at SR 82 and Howland-Wilson Rd.~|~04 - Reconstruction - No Added Capacity~|~7B246EEA8D614E2EAD2C56BD6374DEF9ED90C92F 109520~|~3~|~4~|~04/S>2~|~Intersection improvement at TRU SR 46/Howland-Springs Rd.~|~21 - Safety~|~AEF31D3A48B8078F9793F16D4D7C9DADF877F46C 109520~|~1~|~2~|~02/S>2/TCSE~|~Waterline relocation along SR 46 paid by the Trumbull County Sanitary Engineer. NOTE: Waterline work along E Market St is included in the project cost and reimbursable to the owner or paid by ODOT.~|~43 - Utilities~|~4A590789611049E1B4629BBC0303F594A74700C9 109520~|~1~|~1~|~01/S>2~|~Intersection improvement at SR 46 and E Market St, includes culvert work.~|~04 - Reconstruction - No Added Capacity~|~6EB3015C6C6A95A76ED080DB70461D15B2FDC2B5 109520~|~4~|~5~|~05/ENH~|~Construct new sidewalks on the east side of SR 46.~|~28 - Facilities for Pedestrians & Bicycles~|~1ED2F3E390C614147A3153349BB6A75E1235E1A8 126746~|~1~|~1~|~01/NFP~|~Created Plan Split for ODOT TID involvement~|~~|~6E404664DBBFE2C4D0536A9C87035E0D1B343265 87096~|~1~|~1~|~01/STR~|~Plan split for resurfacing the Rural portion of WAR SR 123 between Morrow and the Montgomery County Line. The Rural Portions are from SLM 9.62-16.08, from 20.84-22.45, and from 23.54-23.95~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE7C79031693E3960B57C432CD357D449B1F0755 87096~|~1~|~2~|~02/S<2~|~Plan split for resurfacing the STP<200000 portion of WAR SR 123 between Morrow and the Montgomery County Line. The STP<200000 Portions are from SLM 22.45-23.54, SLM 24.59-27.54, SLM 31.25-31.41, and SLM 32.09-33.61~|~05 - 4R Maintenance - Resurfacing~|~A7BA65A79A9D59E045DE3E320917565FEC888BD0 87096~|~1~|~3~|~03/S>2~|~Plan split for resurfacing the STP>200000 portion of WAR SR 123 between Morrow and the Montgomery County Line. The STP>200000 Portions are from SLM 9.45-9.62, SLM 16.08-17.23, and SLM 20.67-20.84~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2BDC18B5CF7DA5D6DC34D21E9B1CB1D6FF663F8A 87096~|~1~|~4~|~04/S<2~|~Rehab on small urban bridge.~|~13 - Bridge Rehabilitation~|~D728890CB7AB70904574CBF4CEFA7A9C7279C41B 107508~|~1~|~1~|~01/NHS~|~STW Freight Detection Upgrade.~|~21 - Safety~|~8E92293BE0C2C184769CAFCB6186CC039CC0098A 107966~|~1~|~1~|~01/STR~|~Federally eligible resurfacing items.~|~05 - 4R Maintenance - Resurfacing~|~F1E98F335F1D868344F8DF154A14885C36DF8594 107966~|~1~|~2~|~02/S>2~|~For work performed within the Wooster Urban Area~|~05 - 4R Maintenance - Resurfacing~|~1A7702AC79D7CB96E7B488D9D5726A627DF2D216 115566~|~1~|~1~|~01/MPO~|~MORPC STBG - Grade Separation~|~01 - New Construction~|~17183555F846C8A404DA0A9F29C6EA5D5BB298E9 115566~|~1~|~2~|~02/S>2~|~ORDC Share of Grade Crossing Elimination Project ~|~01 - New Construction~|~0DCED3AEE5866B0F857FE3A5581DBF5A81C751DE 103526~|~1~|~1~|~01/NHS~|~FY2020 Urban Paving for the City of Oxford on US50 within the City of Oxford. The limits are SLM 15.25 - 16.29 - US27 within the City. This Plan Split is for the items paid at 80% ODOT and20% City mainly consists of planing, new asphalt overlay and final striping.~|~05 - 4R Maintenance - Resurfacing~|~42EA06FEE3C5EE05C9E1FE02920E469DF090C12B 103526~|~1~|~2~|~02/NHS~|~FY2020 Urban Paving for the City of Oxford on US27 within the City of Oxford. The limits are SLM 15.25 - 16.19 - US 27. This Plan Split is for the items paid at 100% City mainly consists of pavement repair. MOT striping, utility work, curb & gutter and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~ED5B280DD2160749E25E1281AF0A15CCEC88DDF4 103526~|~1~|~3~|~03/NHS~|~Pedestrian improvement on High Street from Patterson Avenue to South Campus Avenue in Oxford. Improvements include: convert center-turn lane to a raised landscape median with pedestrian refuge island and marked crosswalk: reduce the number of crosswalks along the corridor; install illuminated pedestrian signage; and install highly visible crosswalks.~|~28 - Facilities for Pedestrians & Bicycles~|~0277EB2277F179F73FE9904B13A55544D1F2F290 103526~|~1~|~4~|~04/NHS~|~Split for non project eligible improvements associated with the Part 2 work (pedestrian improvements on US 27 on Miami University's campus).~|~28 - Facilities for Pedestrians & Bicycles~|~E6B0CFEEB85FC12C0D28F7BD2194206EE3F15BCA 101415~|~1~|~1~|~01/STR~|~DSR# BEL-017~|~04 - Reconstruction - No Added Capacity~|~FDBDF059F53D393570AAE5F0083AE27A68B7894E 123587~|~1~|~1~|~01/S>2~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~C17BE0B3923370C61D4DA7FD37A3BA1227CAD51C 123587~|~1~|~2~|~02/STR~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~48C8BC147CFE4144B131A8836273E1984B544436 123587~|~1~|~3~|~03/NHS~|~GRE-35-0044 conduit linked~|~04 - Reconstruction - No Added Capacity~|~87CA85A7349CB5553B670A84769A70047E864ED8 105890~|~1~|~1~|~01/NHS~|~Repair bridge damage caused by accident on bridge JEF-22-1632 (SFN 4101960)~|~13 - Bridge Rehabilitation~|~2465467937CFF084C1C0EC1A8AAB41806D50A3F8 95420~|~1~|~1~|~01/ENH~|~This project consists of the installation of a bike path from the Great Miami River Corridor Bikeway to Valley Street (CR 525).~|~28 - Facilities for Pedestrians & Bicycles~|~48BB3D3D5C7289A4CED389867E90590E3BB1C08C 113672~|~1~|~1~|~01/CMQ~|~Re-construction of 7 traffic signals on SR 7 in Steubenville; includes ped heads, camera activation, etc. 100% State 4PS7 funds up to $50,000, and 80% Federal 4TA7 and 4TB7 funds up to their respective CAPs. ~|~21 - Safety~|~7C85AC90DD40981F0908628254AE385497D08E75 112158~|~1~|~1~|~01/SAF~|~Replace existing traffic signal and add radar extend detection and back-plates, provide pedestrian signals and curb ramps, the southbound left turn lane approximately 100?~|~21 - Safety~|~5B3E63D80B31B6EC1FDA8A0D2A1B3665F1E2A940 101073~|~1~|~1~|~01/IMS~|~RPMs~|~21 - Safety~|~313521FE2485E3B9C7597B1CEF89B97909F1ADE4 95901~|~1~|~1~|~01/NFP~|~Type B emergency project for full depth pavement repair along MOE 255 0.00-18.08/Various. 100% state.~|~05 - 4R Maintenance - Resurfacing~|~9010141504A1200347A0BE1F41F590A6EE9720FD 102094~|~1~|~1~|~01/NFA~|~The Village of Perrysville proposes to reconstruct First Street, Pottery Street and Bridge Street.~|~04 - Reconstruction - No Added Capacity~|~13DD163732A6E8A8A3377381710BB6DD76418F04 102887~|~1~|~1~|~01/S>2~|~AC Overlay with repairs on:HAM-22 SLM 10.21 to 10.48HAM-22 SLM 10.48 to 11.07HAM-22 SLM 11.07 to 11.94~|~05 - 4R Maintenance - Resurfacing~|~EACECD153D4F80843F80768CE6BDE913755274CF 109658~|~1~|~1~|~01/STR~|~Resurfacing COL-172~|~05 - 4R Maintenance - Resurfacing~|~8F7FFD8040ECB2626EA261A8089A32DAE5836EDE 104867~|~1~|~1~|~01/IMS~|~Replace deck on structure MAD-29-10.61 over IR 70~|~10 - Bridge Replacement~|~B4B9680CA44348D7CE86E23933699436E90DF0E3 125502~|~1~|~1~|~01/SAF~|~Plan split for all work associated with roundabout~|~21 - Safety~|~3CB981CE5B5F51F9776DD7E3F851694FF156D014 106695~|~1~|~1~|~01/NFP~|~ODNR funded project at Zaleski State Forest and Headquarters - pave and stripe parking lot and Hope Schoolhouse parking lot, repair/replace culverts and bridges. Funded 100% state ODNR.~|~05 - 4R Maintenance - Resurfacing~|~29F7520D188368B0EB75D63F84FD91D1ABD44ECB 125232~|~1~|~1~|~01/IMS~|~Widen the IR-675 southbound exit ramp (RA-29000) to Wilmington Pike (CR-85) to provide a 2-lane exit ramp. The ramp terminus will also be widened to provide 2 left turn lanes and 2 right turn lanes.~|~03 - Reconstruction - Added Capacity~|~7C97A9BBDAB7BDB93F194838F2138A8B739FB835 88764~|~1~|~4~|~04/S<2~|~ResurfacingSTP Urbanized Area (Norwalk) HUR-547-7.13 - 8.18 80/20 Fed/State~|~~|~18833939E0699730CF14212E3B072FE7523AC270 88764~|~1~|~1~|~01/NHS~|~ResurfacingUrbanized Area (Sandusky)ERI-006-11.25 - 15.5580/20 Fed/State~|~05 - 4R Maintenance - Resurfacing~|~37E1E8AF1A1002F7DDA8C366C3D8825CA645C3A7 88764~|~1~|~2~|~02/NHS~|~Bridge WorkUrbanized Area (Sandusky)ERI-6-12.40 (SFN 2201674)ERI-6-14.98 (SFN 2201739)80/20 Fed/State~|~13 - Bridge Rehabilitation~|~D63B56CD3DA522A32E847CE45E64E8A8A8D7CE8F 88764~|~1~|~3~|~03/S<2~|~Bridge WorkUrbanized Area (Norwalk)HUR-547-7.25 (SFN 3904326)80/20 Fed/State~|~~|~DF34A42F21B1122A505D1881CBB59B7ED57CBD0B 96784~|~1~|~1~|~01/STR~|~General System Resurfacing including pavement repairs and pavement markings on SR 800 from SLM 15.89 to SLM 25.04.~|~05 - 4R Maintenance - Resurfacing~|~7A2C29D25207B8DE01EE835B6628DA4E4D023476 81425~|~1~|~1~|~01/SAF~|~Widen SR-125 to add a right turn lane westbound at mt. carmel road and to provide a third westbound through lane from just west of the IR275 southbound exit ramp to Independence. Widen Mt. Carmel to provide southbound dual left turn lanes. Widen SR-125 to provide a third eastbound through lane from just east of the IR275 northbound exit ramp to approximately 1300' east of Nine Mile Road.~|~21 - Safety~|~657EE480BF72834CB9232DAD70FB9F9EA5CEDD2C 81425~|~2~|~2~|~02/NFP~|~Clermont County Water & Sewer items of work in the SR125 project from 0.40 miles east of the Hamilton county line to 1.15 miles east of the Hamilton county line~|~43 - Utilities~|~F37E8FF588F1FB88429381084865805943BF0416 89018~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) 6003605 MUS IR70 23.82 Intersect: 70 Under C107 Sundale Rd; BR Eligible for Rehabilitation: Length=280 SD/FO(2) SR=78.5 DSR=7;~|~13 - Bridge Rehabilitation~|~F608ECEA7529C559205598926F9FA92D12BBB9E0 101894~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~E8BC76A489D0C9CAF0FED71880878880D0A12417 123286~|~1~|~1~|~01/SAF/HAS~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~BD3BAAB41FF4A26C460919077BB4ACC91438A618 99700~|~1~|~1~|~01/STR~|~Split for resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~65EBADDB5AD89C1091E8DFE225AC3F3A96D06C3B 99700~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~86539607C664E13F208EB4DA06EDEE6EADB865A1 126097~|~1~|~1~|~01/SAF~|~Safety improvements on Dixon Mill.~|~21 - Safety~|~82A7EF5C910BE771C37D32B7BC53FB8C7D369AEF 96167~|~1~|~1~|~01/NFA~|~Various locations in the City of Rossford.~|~01 - New Construction~|~89F1A7AB6DC6FE80065BC877792FF88C36563FEF 110619~|~1~|~1~|~01/NHS~|~NHS Plan Split: DEL-23-10.63-10.81~|~05 - 4R Maintenance - Resurfacing~|~BF6E295534EFCF0ED76894AE320CF2FE77161751 110619~|~1~|~2~|~02/S<2~|~City of Delaware Urban Paving Plan Split: DEL-23-10.15-10.81~|~05 - 4R Maintenance - Resurfacing~|~0E21BB94F4ABF0D624626B06D38CBF33EA3C5D2E 118704~|~1~|~1~|~01/NHS~|~Rockfall hazard remediation. MEG 33 4.45, 6.30-6.45.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CECEF0A44B3899214B9D2B75DE0EF69EBB78A427 114636~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~DD3E064A86D5302DB3BB3C4675CE90470E808AF6 126180~|~1~|~1~|~01/NFP~|~lighting ps~|~44 - Other~|~52C16C9754F94397B9384DE9218DDAAA28EEF86A 98897~|~1~|~1~|~01/IMS~|~Guardrail repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E297E906F3216E307D1410E2334870988EB477EC 94602~|~1~|~2~|~02/SAE~|~This Plan Split is the for Systematic replacement of the Type A Anchor Assemblies. This is for the specific locations in the plans on BUT-4, BUT-27, BUT-42, CLE-32, CLE-52, GRE-444, HAM-32, HAM-125, HAM-22, HAM-27, HAM-50, HAM-52, and HAM-127~|~21 - Safety~|~14D1F0B3584F553546BB2823543364BAC8FF3F9D 94602~|~1~|~1~|~01/NHS~|~District wide guardrail repair. This plan split is for the general guardrail replacement/upgrade on the as needed basis.~|~21 - Safety~|~C95A96634D85C15CDB0F2D31753935EF9093449F 88778~|~1~|~1~|~01/STR~|~Chip Sealing Multiple Routes~|~05 - 4R Maintenance - Resurfacing~|~1489947C6ACBC10CADE34ADAC8FB4311159FE434 88778~|~1~|~2~|~02/S<2~|~Chip Seal portion of roadway in Crestline urbanized area~|~05 - 4R Maintenance - Resurfacing~|~A1680C8B7B5B4EF80B225E58ABEB29F5A86DA885 123518~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~548DDB2E6CBC2040395357989D94AC3C7D402F2C 123518~|~2~|~2~|~02/STR~|~Landslide repair at two locations on BEL-147~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68D6360BB1741EE61D6469121AC57C849868CAEC 111398~|~1~|~1~|~01/STR~|~Replace culverts on BUT-122 and BUT-177~|~04 - Reconstruction - No Added Capacity~|~7175AD4C769D5C303027F5D249D8ADD01AB833EC 122208~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-75-C~|~~|~B54366339763C0D1A7B69FBF0F453EBC307F522F 112481~|~1~|~1~|~01/S>2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~249D2E5B12B72396A35416D397EF0DF1EE570564 114706~|~1~|~1~|~01/STR~|~Overlay on BRO 62.~|~05 - 4R Maintenance - Resurfacing~|~24A98B97B146AF7D456F385CD40746DD45B82CAB 102361~|~1~|~1~|~01/STR~|~Microsurfacing of MAH US 224 from 0.00 to 2.88, MAH SR 7 from 0.00 to 3.15, MAH SR 534 from 8.49 to 13.78.~|~~|~C54CF3775B9825E177C7FB5E4520ADDA57E6C045 118619~|~1~|~1~|~01/STR~|~All of the work from SLM 17.689 to SLM 22.075 that is outside of the corporation limits of Delphos. ~|~05 - 4R Maintenance - Resurfacing~|~E934D1A14B0AA52B90F042B3D903C95C49B6675F 118619~|~2~|~2~|~02/S5K~|~All work within Delphos from SLM 22.075 to SLM 22.611. ~|~~|~4D8696F984561929DD66979C1C4E57DEA256CEE6 88720~|~1~|~1~|~01/BRO~|~Brdg Deck ReplacementOn SR247, 0.62 mile south of the Hillsboro corporation limits, it is proposed to replace the bridge deck on SFN 3603660 11.07 Intersect: Rocky Fork Creek. 80 Fed/20 State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~9D2149D6D46198FF51406649977EA92357877D8B 122363~|~1~|~1~|~01/MPO~|~Plan split for eligible road rehabilitation & resurfacing work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2C95D33555FEB4E4538C4740C6831E3A00EC937D 122363~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% Local cost.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~58BF21D472D65F4F068D8FC5E6BCC45C3752495C 88483~|~1~|~2~|~02/SAF/GAH~|~Non eligilbe removal and replacement of asbestos water line under Heil Rd sidewalk - 100% Gahanna funding~|~21 - Safety~|~4190AA6D8B28BE183C0BA1F5D6526D56C6E4ECAA 88483~|~1~|~1~|~01/SAF~|~SRTS funding for sidewalks, bikepaths, bike lane, bike racks, signals, school flasher, signing, pvmt markings~|~28 - Facilities for Pedestrians & Bicycles~|~5FA7469BF3F4705DFB10B0332868C8DBD95D7B47 93253~|~1~|~2~|~02/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on SFN 4502671 - LIC US 62 11.04; SFN 4502701 - LIC US 62 13.00~|~13 - Bridge Rehabilitation~|~E17B8E738B57927B8BBA01CA357C5A0B65B71CC3 93253~|~1~|~1~|~01/IMS~|~District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge painting on 1) 6002404 MUS IR70 2.99 Intersect: I-70 Over Cr28 Hopewel Rd; Not BR Eligible for Rehabilitation: Length=139 SD/FO(0) SR=90.3 DSR=7; 2) 6002439 MUS IR70 2.99 Intersect: I-70 Over Cr28 Hopewel Rd; Not BR Eligible for Rehabilitation: Length=120 SD/FO(0) SR=8.3 DSR=7;~|~13 - Bridge Rehabilitation~|~BB166C9349441776F91D69C7D6D0F93E53E53861 93253~|~1~|~3~|~03/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Bridge painting on 6004415 MUS SR93 31.42 Intersect: Over Br White Eyes Creek; Not BR Eligible for Rehabilitation: Length=18 SD/FO(0) SR=71.8 DSR=7;~|~04 - Reconstruction - No Added Capacity~|~EA9AF2F5A3529EAD2E0B06320304327AB1DA6BC9 101526~|~1~|~1~|~01/STR~|~DSR# COL-007~|~04 - Reconstruction - No Added Capacity~|~5021B28C78406F973CB634DD857F1835FD8ACC75 101526~|~1~|~2~|~02/STR~|~Culvert to be replaced with slope repair project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~20D0F4A943B5DE391C4B0BF3A5AF46539B043ABF 105433~|~1~|~1~|~01/STR~|~Plan Split for bridge DEL-521-10.32 & DEL-521-12.75~|~10 - Bridge Replacement~|~590AEDEE8736EA1346D9DD2F88DAA65338E3BC09 105433~|~1~|~2~|~02/STR~|~Roadway work and ancillary items associated with the four bridges. Bridge work - DEL-521-11.38 and DEL-521-11.98~|~04 - Reconstruction - No Added Capacity~|~D1A1BB266E59FE76C061EB1ADADA2FF7F5F4AB74 99451~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% State funds from the District Preservation Program budget SAC 4PS7.~|~21 - Safety~|~0796582EB64D28BCEA1D20FDB6186AA91BF4EBF2 109054~|~1~|~1~|~01/IMS~|~Guardrail for Interstates.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~73ED8DA9ACEA77BD292FBBF4A8BCA774B9248464 109054~|~1~|~2~|~02/NHS~|~Guardrail on NHS System.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E2391127AEDFFA409F118744716FD03BCBC6BD92 121515~|~1~|~1~|~01/SAF~|~Guardrail replacement & adjustment~|~21 - Safety~|~081E10842400EE6BE103C4AD47F1875D87572615 90757~|~1~|~2~|~02/S>2~|~LUC-CR22-16.74 to 17.01; this is for the piece between Monroe St and I-75/Glenwood. No TMACOG funds on this piece.~|~05 - 4R Maintenance - Resurfacing~|~BD140DBE8451BCB5F8512C6325FE4572CB8616E8 90757~|~1~|~1~|~01/MPO~|~LUC CR22 17.02-17.52 Bancroft St reconstruct..From I-75/Glenwood to Ashland.~|~05 - 4R Maintenance - Resurfacing~|~BD9D138A7289714D7480BEDDDF597E694668A26D 122464~|~1~|~2~|~02/S5K~|~TAP funded plan split for sidewalk/pedestrian related work.~|~28 - Facilities for Pedestrians & Bicycles~|~40ECB37F017B11E0C8F268DFC1C6605479C5625C 122464~|~1~|~1~|~01/S5K~|~Reconstruction work included in this split funded by small cities funding.~|~04 - Reconstruction - No Added Capacity~|~9C4E94A8C8C392F10E5F2947743B6292D5AB88D7 102713~|~1~|~1~|~01/NHS~|~This plan split is for mill and fill on NHS route.~|~05 - 4R Maintenance - Resurfacing~|~53D11DBC2C45D103108FD417F6C476F33D26CF0C 102713~|~1~|~2~|~02/SAF~|~Signal work~|~21 - Safety~|~81A80A7043A626BC2E85BF7FFAC2D05A427104F5 102713~|~1~|~3~|~03/NHS~|~Local funded pavement repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6195BD59992467DBD39C602908FECBACDE300EBE 102713~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~3235E9C927BC76C7466EBC71FBE6BB507EEFEE62 89048~|~1~|~1~|~01/CMQ~|~80/20 fed/local funding split using NOACA CMAQ funds.~|~21 - Safety~|~4798779B6D210AAD98D42EAA34BBDD721657A170 105776~|~1~|~1~|~01/NFP~|~Plan split for mowing~|~44 - Other~|~7BD5548243FB0E4D8D17A0DDD06D9C25825C640F 117086~|~1~|~1~|~01/NFA~|~D09 HS FY2025~|~31 - Landscaping & Other Scenic Beautification~|~B8F3BE8DF7BB837AEBB9EB8A94DE3E35D373A82C 107919~|~1~|~1~|~01/S<2~|~On SR 163 from SLM 27.20 to SLM 30.12~|~05 - 4R Maintenance - Resurfacing~|~CBF6B39D1B019034D73A61EAA7109D69F254D402 114303~|~1~|~1~|~01/NHS~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E8ABA18DAC5A2BEFDC4FF81D51AAB4690914C5AE 98509~|~1~|~6~|~06/S>2~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~A78719946F41075470FD68F55D75B913F7B028B6 98509~|~1~|~3~|~03/S>2/HUBB~|~Resurfacing TRU SR 304 from 7.09 to 8.74 in the City of Hubbard.~|~05 - 4R Maintenance - Resurfacing~|~6BDCA069869BEA8D506846F0CD2FBC9A0CFE7103 98509~|~1~|~4~|~04/STR/HUBB~|~Resurfacing TRU SR 304 from 8.74 to 8.89 in the City of Hubbard.~|~05 - 4R Maintenance - Resurfacing~|~41A6A95248A57456C310B172043E0620BB077A8E 98509~|~1~|~5~|~05/STR~|~Resurfacing TRU SR 303 from 0.00 to 1.28 and TRU SR 304 from 8.89 to 9.95.~|~05 - 4R Maintenance - Resurfacing~|~C061546E3AC6571A78DE1AFA4BEEA6FE6EE9332E 98509~|~1~|~2~|~02/S>2~|~Resurfacing TRU SR 45 from 10.66 to 11.65 and TRU SR 169 from 6.42 to 6.76.~|~05 - 4R Maintenance - Resurfacing~|~FBC1BCB0870B154EF0D11B17083F6755B38AE85F 98509~|~1~|~1~|~01/S>2/NILE~|~Resurfacing TRU SR 169 from 5.65 to 6.42 in the City of Niles.~|~05 - 4R Maintenance - Resurfacing~|~80F5971E060043556FD98A5E2149EA1FF3E7AAF1 98509~|~1~|~7~|~07/SAE~|~Adding Rumble Stripes.~|~21 - Safety~|~4984EA4F2D7AD5206E4164FD7AB9B90CD10C79C7 98509~|~1~|~8~|~08/S>2/HUBB~|~100% City of Hubbard items.~|~21 - Safety~|~35FE8208E481BB2CD219D501ABEEC20B11A56D1A 88290~|~1~|~1~|~01/SAE~|~Plan split for all work eligible for 100% federal participation from SRTS and OH393.~|~21 - Safety~|~007C6121231E2D3356711D53D81FC612313C9B08 119477~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing CEAO LBR Federal Funds at 80/20.~|~10 - Bridge Replacement~|~BC715F0590BAFCC4E0CFD3830B6E9E2B142861F1 122339~|~1~|~1~|~01/NFP~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~C843ECF4AEB31A686FAED8272DEC68C8561E0C7D 101192~|~1~|~2~|~02/NHS~|~Replace traffic signal at US 23/Tarlton Rd~|~21 - Safety~|~CCDB851ADF19F5B1A08EB477B5C58A85C2E111A5 101192~|~1~|~1~|~01/NHS~|~Pavment overlay from 0.00 to 5.21~|~05 - 4R Maintenance - Resurfacing~|~FDB2949D6E0CE40757A40639C4688D62FBEB4138 121543~|~1~|~1~|~01/IMS~|~Drainage Block PID.~|~99 - State Preventative Maintenance~|~EF143E530FD365C5553457F1D459AE23BA944A59 92110~|~1~|~1~|~01/SAE~|~SRTS Project (Sidewalks)~|~28 - Facilities for Pedestrians & Bicycles~|~73DA0B42CBF52AA0C02C25C1E010D6C998EC678C 92110~|~2~|~2~|~02/SAE~|~Added Plan Split for 100% Local Items~|~28 - Facilities for Pedestrians & Bicycles~|~B94C0065E8F3C21110689CBC3CC9092BF0AA5A64 94675~|~1~|~1~|~01/STR~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~B71CF66F344B451BDBCAE5FB5DFE8A1522DF1FDF 125427~|~1~|~1~|~01/NFP~|~DS FY32 plan split.~|~47 - Bridge Preventive Maintenance~|~89CA06826266D5B62426F9E9AEC83F205894B80B 107217~|~1~|~1~|~01/NHS~|~replace the existing US 35/Valley Trebein intersection with an interchange of Valley Trebein over US 35.~|~04 - Reconstruction - No Added Capacity~|~4D195721D0A21E3CD9AC1E8B9C8BDE974A337774 107217~|~1~|~2~|~02/NHS~|~This plan split covers all work associated with constructing two new bridges for the project. ~|~01 - New Construction~|~6C8FC2CA3785734AC532A6318DEBEF1150D06B59 107217~|~1~|~3~|~03/NHS~|~This plan split covers all bridge work related to rehabilitation.~|~13 - Bridge Rehabilitation~|~2E4F42059D3AD85A2D04A56DEA66085A94348285 107217~|~1~|~4~|~04/NHS~|~Small resurfacing section on GRE-35 added by change order. Roughly WB SLM 6.91-7.29 and EB SLM 6.91-7.15~|~05 - 4R Maintenance - Resurfacing~|~BCBACC17D07E7903F69ADF7DDA20DA0AFB880B4C 114231~|~1~|~1~|~01/SAF~|~Stripe new crosswalks in Lewisburg on SR-503~|~21 - Safety~|~90DAE526947A9EF260CA8ECB356E817A57A5421B 105248~|~1~|~1~|~01/NHS~|~Resurfacing of SR 7 from SLM 0.37 to 3.48~|~05 - 4R Maintenance - Resurfacing~|~1FC503585DB078E44819FCB9738B8744B6206DE1 100922~|~1~|~1~|~01/STR~|~Thin AC overlay on rural routes: CHP SR 29 SLM 27.15 to 30.06 & CHP SR 235 SLM 6.59 to 9.58.~|~05 - 4R Maintenance - Resurfacing~|~3513106B9829A2828B88163A580C643447A3C8C4 102858~|~1~|~1~|~01/IMS~|~Deck replacements > 20' span.~|~13 - Bridge Rehabilitation~|~8DF6812A32347C9FF296208DCD172959CBAA17F2 102858~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~~|~81A99F420EBC657CCAD0439536FE4D617884FFE3 107760~|~1~|~1~|~01/SAF~|~Turn lanes, pedestrian improvements and RR signal pre-emption at Sycamore Street in Columbus Grove. Safety program funds will be used first and District Preservation Program funds.~|~21 - Safety~|~4BFAB0984269489387C53AC08084B92EDD2C5661 107760~|~1~|~2~|~02/STR~|~Railroad related work funded by ORDC. Work includes a traffic signal, blank out signs, pavement markings, sidewalk, and curbing in and around the intersection of SR 65 and Sycamore Street.~|~22 - Rail/Highway crossing~|~B6E4F74DD2D4B6C11F4E18478A1183348E5468FF 107984~|~1~|~1~|~01/NFP~|~Guardrail Maintenence~|~21 - Safety~|~A847650E1B1756210F84CC751A4DDF3B377F6B9C 118615~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~3497C3319AD851C611DAC178019FCFE86F965E86 91623~|~1~|~1~|~01/IMS~|~Spot paving on various Interstate routes in FAY, FRA, MAD, & PIC Counties~|~05 - 4R Maintenance - Resurfacing~|~332EBA38774CBD5C80A101A832D85BDA6A5C14FE 86846~|~1~|~1~|~01/SAF~|~A safety funded project to widen HEN SR108 16.09-16.62~|~21 - Safety~|~78D61B3A8F1F6E76F1D945433A06580713BDBD00 98534~|~1~|~1~|~01/NFP~|~All work is in this split. 100% state funds from the District Preservation Program budget. SAC 4PS7.~|~21 - Safety~|~6AFABBF186BC9D09865B6B53F416B0C0FA5E7837 87128~|~1~|~1~|~01/BRO~|~Rehabilitate bridge WAR-48-0896 by replacing the concrete deck and painting the structural steel. SFN: 8301115 and Intersect: Turtle Creek~|~13 - Bridge Rehabilitation~|~C78576ABA16607936A3A7C7C3F662EBA37B2D9A8 100544~|~1~|~2~|~02/NFA~|~Project to place 1.25 " overlay on various routes in Champaign County classified as Non Federal Aid Routes.~|~05 - 4R Maintenance - Resurfacing~|~BC8820521AE8E45C3E4EB50085B68090C3A5952C 100544~|~1~|~1~|~01/STR~|~Project to place 1.25" overlay on various rural routes in Champaign Count.~|~05 - 4R Maintenance - Resurfacing~|~BF9AFC3A71393CA5FB354ABCC7C286016D407887 107240~|~1~|~1~|~01/SAF~|~FRA Refugee Rd at Winchester Pike. Signal modifications, pavement markings, pedestrian improvements, access management~|~21 - Safety~|~1BFA01BC90B8926CF26C43A85AF589A3BD5BDF14 107687~|~1~|~1~|~01/STR~|~Resurfacing on SR 65 outside of the Lima Urban Area using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~52CEA74E45AB470358297FE8C85F61A817FDA74F 94328~|~1~|~1~|~01/S5K~|~Resurfacing along MUS-93~|~05 - 4R Maintenance - Resurfacing~|~C3CE72E9C4639B69ECCE5065C92FA6FCB2F2E720 94328~|~1~|~2~|~02/STR~|~Resurfacing along rural classified roadway segments.~|~05 - 4R Maintenance - Resurfacing~|~5C051D01A274724DA0DDF77B7599BA8A7F4B9555 112119~|~1~|~1~|~01/NHS~|~Ditch clean out and repair~|~44 - Other~|~37D7F74D6539E2374B8DF42456EC59872D903503 113031~|~1~|~6~|~06/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~24DDA167EFFD3D58B229AC24090D3C887E51997D 113031~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A095CB9DFA0EC4564B0C2D7289C985ADA54CDEAD 113031~|~1~|~5~|~05/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~7E9B51186A7B620208F5A02A3F93F504896C2A55 113031~|~1~|~2~|~02/NHS/NFRA~|~Resurfacing, urban paving City of New Franklin.~|~05 - 4R Maintenance - Resurfacing~|~9462717F02C91CD650A781098EFC399A62D8F04B 113031~|~1~|~3~|~03/S>2/NFRA~|~Resurfacing, urban paving City of New Franklin.~|~05 - 4R Maintenance - Resurfacing~|~A0563EFD542F8A0DEBB9757657837910F8B3A303 113031~|~1~|~4~|~04/NHS/NFRA~|~Full and partial depth pavement repairs, City of New Franklin.~|~04 - Reconstruction - No Added Capacity~|~77E63F141EDF7161011C3B7D7D3EE63672A882C7 124266~|~1~|~1~|~01/S>2~|~Construct pedestrian facility~|~21 - Safety~|~0A0ECCE9436FD4CE15EC452D39AFBAA411D69C10 124319~|~1~|~1~|~01/MPO~|~Federal items~|~05 - 4R Maintenance - Resurfacing~|~DCD26AAAA7299F8E7525DCD99CFC1DFBB34B42BB 101404~|~1~|~1~|~01/S<2~|~Plan Split for the 80/20 items on SR 732 between SLM 15.49-16.48 - US 35 SLM 10.02 - 12.42~|~05 - 4R Maintenance - Resurfacing~|~1BFDA6FAFE19FC79C998F854B401B9A0985A457B 101404~|~1~|~2~|~02/S<2~|~Plan Split for the 100% City items on SR 732 between SLM 15.49-16.48 - US 35 SLM 10.02 - 12.42~|~05 - 4R Maintenance - Resurfacing~|~F835E96AA07CD429FC6EC758A1F0635D19728F68 95562~|~1~|~1~|~01/NHS~|~Priority System minor rehab. on TUS-36; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~5DBAEB1E0502644966BA65B18DBF8FDCF994F149 107901~|~1~|~1~|~01/NHS~|~Priority System NHS Plan Split: DEL-23-10.63-10.81~|~05 - 4R Maintenance - Resurfacing~|~2034F2E72CAE8618E63108D50672CB87EDC3D3C7 96284~|~1~|~1~|~01/NFP~|~Plan split for facility renovation~|~44 - Other~|~1A6AE6B4D457959FCD87178274CBBBE0B7FD5243 95688~|~1~|~1~|~01/MPO~|~3 traffic signals on SR-65~|~21 - Safety~|~9C08AB1ACF2CD0B75DC28155F42978BB9B9844E9 124469~|~1~|~1~|~01/SAF~|~Install sidewalks~|~21 - Safety~|~014111418E34F564795F9B07F182ABF40D9B7BEA 99942~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~A24F5E4835E7F7C3A668D6D2C8E6D2B7E80865CF 96465~|~1~|~2~|~02/NHS/CIRC~|~100% city funding for sanitary and water lines and unwarranted signal at S Court St/new connector~|~21 - Safety~|~8F019F3938C0F2C5AA6E2694D56C5CFA33831380 96465~|~1~|~1~|~01/NHS~|~Small City/Local funding to construct S Court St Connector, relocate Pickaway Crossing and Goodchild Rd and work on US 23 and S Court St~|~21 - Safety~|~CB27955CA3FF182D7624F110B326F198685437B6 124998~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~17 - Construction Engineering~|~472394D9681ACC1E8F4CEB0992DDAC192DBA9E62 96264~|~1~|~1~|~01/SAF~|~This split uses federal Safe Routes to School funding and uses Toll Revenue Credit to bring the federal percentage to 100%.~|~28 - Facilities for Pedestrians & Bicycles~|~8660F56F5916788A988A1FE1F814ECF160B5CED4 118147~|~1~|~1~|~01/STR~|~Landslide repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4977802F1618FE1BB698E25EB14B0B65F619EE69 118147~|~1~|~2~|~02/STR~|~Water line relocation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~57D28BBCF8072E4BC570DAD1C29C5EB94C163FD0 84575~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 377 0.00-1.47 and MRG 377 0.00-10.18. Funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~5763552D6E1EAB04E9AF1399BB70D143B53751FF 88827~|~1~|~1~|~01/NHS~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~8F9258932AC70047360B55B8F583312C005B6D7D 98709~|~1~|~1~|~01/NFP~|~Project to install shotcrete on recently built retaining walls.~|~44 - Other~|~2842C0BA9D2907F2E0603CC6C4377D64129C22A5 94701~|~1~|~1~|~01/STR~|~Culvert replacement/rehabilitation. Locations include: NOB 145 0.65, 2.48, 6.21, 7.20, 7.22; NOB 285 3.55; NOB 340 5.32, 5.41, 6.70, 6.74; NOB 513 10.22; NOB 821 12.71, 20.13, 20.24.Funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A63CC5239B6BB77453434558E6CF9DD494697342 94320~|~1~|~4~|~04/S<2~|~District Preservation Paving - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing using 60 AC Overlay w/repairs on OFAH-Urban segments~|~05 - 4R Maintenance - Resurfacing~|~4CC98FA93283AB0744D1816F2C324634AE2B4ECA 94320~|~1~|~5~|~05/S<2/CAMB~|~District Preservation Urban Paving - 4PF7 (80% Federal) / 4BG7 (20% Local - No CAP - Resurfacing using 60 AC Overlay w/repairs on Urban Paving Segments~|~05 - 4R Maintenance - Resurfacing~|~4CCBD9CFE873FDCA72369A8A806538D8BCFA025E 94320~|~1~|~3~|~03/NHS~|~District Preservation Paving - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing using 60 AC Overlay w/repairs on NHS segments~|~05 - 4R Maintenance - Resurfacing~|~C5162E139592C67A04925F86F7EDE868BF047C64 94320~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge Maintenance on NHS Bridge~|~13 - Bridge Rehabilitation~|~4CBEE8F7D14EB701027185E6B61EE8E009331D27 94320~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Bridge Maintenance on IMS structures~|~47 - Bridge Preventive Maintenance~|~DD96C79D1390F83A169BB85E70377F600DC0A75D 94320~|~1~|~6~|~06/NFA~|~retroactive fuel price adjustment ~|~05 - 4R Maintenance - Resurfacing~|~3DEFA99BA03A1A807BC37BB9213B2A2AFAD775DE 104087~|~1~|~1~|~01/NFA~|~plan split~|~13 - Bridge Rehabilitation~|~9F387E360AC5183709C8C915F212EEA814136106 76994~|~1~|~1~|~01/NHS~|~Rehabilitate two bridges by replacing superstructure on one bridge (JEF-7-1235, SFN 4100549) and repairing concrete slope on the other bridge (JEF-7-1185, SFN 4100484).~|~13 - Bridge Rehabilitation~|~10093F00824CEC2CC506566124A0661C6B34A59C 76994~|~1~|~2~|~02/NHS~|~Funding event created for on-going services to be provided by consultant during the construction phase for the rehabilitation of the bridges.~|~17 - Construction Engineering~|~E05B8A3789951BD7D8391C0F710A40C34C25482C 117476~|~1~|~1~|~01/ENH~|~Sidewalks, crosswalks, ADA curbs, and RRFBs~|~28 - Facilities for Pedestrians & Bicycles~|~F9FAEA3A43AB7F0BBE43B70E735DAD87E830FC0F 92906~|~1~|~1~|~01/IMS~|~8702977 WOO CR34 1 Intersect: Tr 34 Eagleville Road 8703000 WOO CR34 1 Intersect: Tr 34 Eagleville Road 8703035 WOO IR75 1.79 Intersect: Rocky Ford Creek8703094 WOO IR75 1.79 Intersect: Rocky Ford Creek~|~~|~31DF0891905DC8C9017B300130EE7F6FFDD8D8A7 105357~|~1~|~1~|~01/NHS~|~Lighting Maintenance~|~21 - Safety~|~802EFF229EA51C76A93A4928BEA4314BD37C3AC0 105357~|~1~|~2~|~02/NHS~|~Installation of a 4 way flasher at ASD US 0224 06.80 & SR 0511.~|~21 - Safety~|~2F916E87100D30CD6CBB381B0DADF8E3D856A156 122046~|~1~|~1~|~01/SAF~|~Roundabout~|~21 - Safety~|~9193FCB997C8C21CB4102F98BA8A8C1DB7DC7C64 121694~|~1~|~1~|~01/SAF~|~Radar Detectors~|~21 - Safety~|~164F210A4B2E053B5771269EAD2C1D895500845E 107763~|~1~|~1~|~01/IMS~|~FRA IR 670 3.88 to 5.03~|~05 - 4R Maintenance - Resurfacing~|~BDF2AFB104FAE5001DF8538E63E2630B2EE7B531 107763~|~1~|~2~|~02/BRO~|~Minor bridge work on 15 structures~|~47 - Bridge Preventive Maintenance~|~A3F1433961754B9F2439D4CEBE6496D759D07BCF 95323~|~1~|~1~|~01/BRO~|~Deficient Bridge SFN 1958038~|~13 - Bridge Rehabilitation~|~D4C15D36F1E01280DDA17E3460D1CC0970E46376 108015~|~1~|~1~|~01/STR~|~Split for Rural STP section~|~05 - 4R Maintenance - Resurfacing~|~576ADBAA674FBD08D3F801FB039867176B407E81 108015~|~1~|~2~|~02/NHS~|~Split for NHS section of pavement~|~05 - 4R Maintenance - Resurfacing~|~A6FCEB6F6D81C16DB17F1B6EE2C1B92E4F320421 122449~|~1~|~1~|~01/SAF~|~Swapping the bicycle lane and parking lane on North 4th Street from Warren Street north to E Hudson Street~|~21 - Safety~|~CD590ABC06FD3E00EEF6E1131666A2C57CDE829C 122449~|~2~|~2~|~02/SAF~|~Part 2: East 5th Avenue from High St to North 5th St~|~21 - Safety~|~750BBB39902CDE315A17E9F0B2503A27AB2AA046 116679~|~1~|~1~|~01/STR~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~3053C2DC08AE5B341EBFE2EA1AB4F4F00F339774 125470~|~1~|~1~|~01/SAF~|~Construct an RCUT.~|~21 - Safety~|~5947FEF427F500346247AF0B9C0F1EE2989A1F76 125470~|~1~|~2~|~02/NHS~|~District Preservation for resurfacing within RUCT area. Resurfacing on remainder of route in this area planned for FY2028.~|~05 - 4R Maintenance - Resurfacing~|~190BC9B57F979E8F45BB4D3F0D3E4CC77B395EBA 109297~|~1~|~1~|~01/NFP~|~D09 HS FY20~|~44 - Other~|~9423BE29977886AA94284A25632300F67398F4BD 106279~|~1~|~1~|~01/IMS~|~Systematic sign replacements on various routes throughout District 4.~|~~|~101F34D86605F7893E68D88E3F01F6C551525AE0 124662~|~1~|~1~|~01/SAF~|~Plan Split for HSIP CEAO funding~|~21 - Safety~|~941962BF3E5A0D3178024703E8B54A32CFF60495 102573~|~1~|~1~|~01/NHS~|~plan split~|~~|~11D0FC27B2912F68097CC71C7241FC0AA94D23E5 102573~|~1~|~2~|~02/NHS~|~WVDOH Share~|~47 - Bridge Preventive Maintenance~|~3783C66B5E7BE5637F707883BDDAC27A4FB37D35 104058~|~1~|~1~|~01/NHS~|~Rockfall remediation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1990BFDEA0F13767082468BA758F39D8C07EDF88 100446~|~1~|~1~|~01/SAF~|~D09 Auxiliary Markings (A) FY2021~|~21 - Safety~|~360AC4FC5F8C4396B1D594EB7B85E708C8CCD628 93536~|~1~|~1~|~01/SAE~|~Sidewalks, pavement marking, and signing near the schools in Yellow Springs~|~21 - Safety~|~94B3AFC8747DACEA254BA00B35F0D8E04965AFB8 84414~|~1~|~1~|~01/NHS~|~Concrete joint repair project. ATH 50 17.50-24.05. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~060415E8597427DB5983DA42014966C37B5F7492 103024~|~1~|~1~|~01/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~4B77E1B65A889D385EAB741FFABAC1EFCE2E13C4 96979~|~1~|~1~|~01/NHS~|~Signal upgrade at SR 534~|~~|~0A99BD1A0542872A980DDE3A85B533D30A21B7D1 110497~|~1~|~1~|~01/STR~|~plan split for pavement work on the rural sections: WAR-350: SLM 4.31-7.9~|~05 - 4R Maintenance - Resurfacing~|~D372657AB2347BEF78B5F1FC1C7D579A2F7A3E55 105435~|~1~|~1~|~01/IMS~|~Pavement work to widen the IR 270 EB to IR 71 NB ramp and convert drop lane to add lane~|~21 - Safety~|~33BAD388A9312F20334AF8253E54176CEAB09EFF 105435~|~1~|~3~|~03/IMS~|~Replace deck on SFN 2511460~|~13 - Bridge Rehabilitation~|~3C1DA50810CA96BFC55802046FD8BB00F57EBE5E 105435~|~1~|~2~|~02/IMS~|~Replace structures SFN 2511224 and 2511372.~|~10 - Bridge Replacement~|~BD06559D370F98CA77442793CFD34C9CACE18819 86757~|~1~|~1~|~01/STR~|~Signals~|~21 - Safety~|~1F4C668AECF68F31256E0E2AAC5E66F4909A0BE5 127137~|~1~|~1~|~01/SAE~|~Installation of new and replacement of existing guardrail on various county routes in Fayette County.~|~21 - Safety~|~F8176A9E1AA36BD18285252E8A6A24FC78399E36 114794~|~1~|~1~|~01/MPO~|~TLCI Intersection Improvement eligible work for the City of Mayfield Heights.~|~28 - Facilities for Pedestrians & Bicycles~|~E38B85864CA0CB3836D409018F890B51C8C0EB11 108884~|~1~|~1~|~01/NFP~|~Federal Exchange Bridge Split~|~10 - Bridge Replacement~|~DC9BA6A704433185D25F952F3409325A0994DD9C 96146~|~1~|~1~|~01/NFP~|~Construction of a full-service maintenance facility in Greene County.~|~01 - New Construction~|~D8BBE3D59877D6256D30DCD96038911E3A0CB202 88344~|~1~|~1~|~01/S<2~|~"01/<2/OT/CAMB - City of Cambrdige~|~28 - Facilities for Pedestrians & Bicycles~|~EDCADA8D8EB637B0D680D83F4C35754E87178396 123604~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction work items funded by NOACA STBG funds.~|~10 - Bridge Replacement~|~0E562E114E01A993CC4DF0926CF0038530BAA5BA 86320~|~1~|~2~|~02/S>2~|~Resurface under urban paving program on MOT SR 48 (South Main Street, Dayton) from River Park (SLM 11.24) to Patterson Blvd. (SLM 12.13)~|~17 - Construction Engineering~|~292C8324119639A5D553F47B944FEF9487FD1A57 86320~|~1~|~1~|~01/MPO~|~Widen South Main Street from 4 to 5 lanes including saphalt resurfacing, curb, sidewalks, street lights, traffic signals, storm sewer and retaining walls on South Main Street from River Park (SLM 11.24) to Patterson Blvd (SLM 12.13) in Dayton.~|~03 - Reconstruction - Added Capacity~|~C1318EFD41AD4DC792B0A5367392FEBA9160457F 112034~|~1~|~1~|~01/NHS~|~All work to repair the slopes. Funds from the Geologic Site Management Program. After the GSM cap is reached funds will from the District Preservation Program Budget.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~80FDA7F5F53393E33297E782EF627A858509D416 110570~|~1~|~3~|~03/S>2~|~Resurfacing on portions of US 50~|~05 - 4R Maintenance - Resurfacing~|~F9774241608F7FF4DE46B6AF606A9399060A9F02 110570~|~1~|~1~|~01/NHS~|~Replace bridge deck on SFN 3103870~|~13 - Bridge Rehabilitation~|~C7DABF6B7CD69D68DD4E5F14CE7B4AB270CE45F1 110570~|~1~|~2~|~02/S>2~|~Bridge deck replacement for bridge SFN 3103811~|~13 - Bridge Rehabilitation~|~29FAB8DDBC4529B670B795541B2A30E6EBDB43AF 119421~|~1~|~1~|~01/S50~|~Asphalt Concrete Overlay with Repairs ERI-101-2.72 to 7.62~|~05 - 4R Maintenance - Resurfacing~|~69CD57E62B7D2BF41A4E205ABCBE1457E008343C 119421~|~1~|~2~|~02/S5K~|~Partial and full depth repairs. 100% local.~|~17 - Construction Engineering~|~59C4E36371E1BB262EFBF38C2BB15EE01B68B9EB 101298~|~1~|~1~|~01/STR~|~ALl roadway work included on US 68 in Clinton County~|~05 - 4R Maintenance - Resurfacing~|~4F98364A288C0A44D0B4872AAFEBA06692F267A3 127055~|~1~|~1~|~01/S5K/CAMB~|~Rehabilitation and related roadwork in the City of Cambridge. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5E8A030C96CCC32D456A06AC8EF7AA71ABD8A7F2 103180~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation Pavement - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on Mus-IR 70-10.66 to 13.22~|~05 - 4R Maintenance - Resurfacing~|~F2970A2621E34E43EA72378EF9FECE184EBB12F6 103180~|~1~|~2~|~02/IMS~|~"02/IMS/BR/ " - District Preservation Bridge - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Deck Sealing of Priority System bridges along IR 70 in Zanesville (Mus-IR 70 10.66 to 13.22)~|~13 - Bridge Rehabilitation~|~B582142EFCB2D06EC4C2459D5AECFA8081167DFC 100610~|~1~|~1~|~01/STR~|~Plan Split for the rural portion of SR 235 from SLM 0 - 5.16~|~05 - 4R Maintenance - Resurfacing~|~1547A48F749C4C5DB4EFBF7FC89A5E0FAE21C95F 100610~|~1~|~2~|~02/S>2~|~Plan Split for the Urban portion of SR 235 from SLM 5.16 - 6.13~|~05 - 4R Maintenance - Resurfacing~|~FE026E1EC31FFBFF56F8D5EDBF954E81F006D36A 100610~|~1~|~3~|~03/NHS~|~Plan Split for NHS portion of US 68 from SLM 11.34 - 20.46~|~05 - 4R Maintenance - Resurfacing~|~ADD6890E167E85A0A153B5A6416EB8744759FF80 100610~|~1~|~4~|~04/NHS~|~This plan split is for bridge work on this project.~|~05 - 4R Maintenance - Resurfacing~|~0E85D8B67DD9015BAAD0268A16FFEA3A12C06C93 103249~|~1~|~1~|~01/MPO~|~Resurface portion of the GMRRT~|~28 - Facilities for Pedestrians & Bicycles~|~76C78341B0A91C1071741D0453DED7AC24EF0903 83312~|~1~|~1~|~01/MPO~|~An MPO (CMAQ) funded project to construct roundabouts at WOO CR9 7.39-7.68/WOO TR68 0.46-0.74~|~21 - Safety~|~EEADA914BE30BE62C17ECD4F5915F3CB618C5AF7 107278~|~1~|~1~|~01/BRF~|~Fed eligible items for the bridge replacement~|~10 - Bridge Replacement~|~760B4C9CA74917D43CA5A3CFB63E559C76EC6593 90902~|~1~|~1~|~01/STR~|~District Allocation~|~13 - Bridge Rehabilitation~|~76C2F28D0EED565EB8AEB1022D38DBA4691EA61B 119801~|~1~|~1~|~01/MPO/CANT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4EE75DC48991D152FF4690B7DBEB086AC4311E50 113835~|~1~|~1~|~01/STR~|~Major rehabilitation of SR 39~|~04 - Reconstruction - No Added Capacity~|~ABBF258C881A1663628DDB88705B34F954910A30 120493~|~1~|~1~|~01/MPO/MASS~|~Construct a new roundabout.~|~21 - Safety~|~CEFEE9A0BC7FCE304A77D74CB4D2AD8C16D6E840 80704~|~1~|~3~|~03/NHS~|~"03/NHS/BR/ " - TRAC Funded (80% 4BK7/20% 4BD7) - Partial CAP - $1,000,000.00 maximum of District Preservation 4PF7(80% Federal) / 4PS7 (20% State) - Construction of the new bridge carrying new roadway facility over SR 16 and removal of LIC-16-1771L (SFN 4500849).~|~01 - New Construction~|~34C29438B170B375C3A3A3E53CC97450946B279B 80704~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - TRAC Funded Roadway 4BK7 (80% Federal) / 4BD7 (20% State) - No CAP - Work includes improvements to SR 16, interchange ramps, and new roadway between ramp termini.~|~01 - New Construction~|~49BF79BFB4A3ADA17FDB33723EC473B3B6FE560A 80704~|~1~|~2~|~02/S<2~|~"02/S<2/PV/ " - CMAQ Funding 4BK7/4TB7 (80% Federal) /4BD7/4BG7 (20% State/Local) - CAPs: LCATS: $2,971,300, Village of Granville: $250,000, City of Newark: $195,783.75.- Realignment of 1) Lic-CR 128-00.05 to 00.54; 2) Lic-CR 539-05.52 to 07.89; establishment of new roadway to service interchange facility.~|~01 - New Construction~|~A1341A2FBA00D92606953D5C2211CF53AD45D871 80704~|~1~|~4~|~04/ENH/NEWA~|~"04/ENH/OT/NEWA" - Transportation Alternatives Program - 80% 4B37/20% Local - CAP = 1) ODOT TA Funds (4B37) $1,000,000.00; 2) Private Donations (4BG7) $28,700.00; 3) City of Newark Funds (4BG7) $104,216.25 - Construction of bike path, decorative railing, portion of bridge to accomodate multi-use path, and installation of roadway lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~E6481A979D758D2CA1ACED3B2739589FF9CAE2B0 113477~|~1~|~1~|~01/MPO~|~Roadway reconstruction consisting of replacing the entire roadway section from the base to the concrete surface, along with new curbs, sidewalks, pedestrian and roadway lighting, drainage facilities and decorative amenities enhancing and extending the entrance into downtown.~|~04 - Reconstruction - No Added Capacity~|~C05F07C43CA48AC2FA0829F7B90F4B7405D8C1CF 113477~|~1~|~2~|~02/S>2~|~Roadway reconstruction - NHS~|~04 - Reconstruction - No Added Capacity~|~13C389C9650FA462304F25C27DEFD0056830CA4C 126896~|~1~|~1~|~01/NFP~|~Plan split for state preventative maintenance for a district wide mowing contract~|~99 - State Preventative Maintenance~|~749D45B6328DB5D8A158E9C7862B0F297BCE82C2 83860~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7 (100% State) - Annual contract for placement of Poly Striping within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AF3DD3E632DA6F2177C7C8A64BD77F1F61B520A8 116589~|~1~|~1~|~01/NHS~|~Resurfacing US-35 SLM 0.00-2.60~|~05 - 4R Maintenance - Resurfacing~|~74E1CE8988980103103D2D75A2100AFAAF9810FC 116589~|~1~|~2~|~02/STR~|~Resurfacing SR-435 SLM 0.00 to 0.96~|~05 - 4R Maintenance - Resurfacing~|~A8BC4A359D6007599B178B23E2EB98B2466F2816 107160~|~1~|~1~|~01/SAF~|~Reconstruct the traffic signal at the intersection of SR 48 and Whipp Road.~|~21 - Safety~|~2B68BF3F42628A00F585634163F5D9E591400E01 107160~|~1~|~2~|~02/SAF~|~Radius improvements to the SE corner to be paid 100% by the City of Centerville.~|~21 - Safety~|~849D0F69C8C4C5AF070AE65E0B0CD53670F3E4F0 112843~|~1~|~1~|~01/STR~|~Resurfacing of MAH US 62 from 1.41 to 5.16.~|~~|~B6008C490F3E39D01B936CE60C4784474E50D013 112843~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span.~|~~|~A9161BE6C70EE3243A3A10EC8578BC1ED891ED1D 112843~|~1~|~3~|~03/STR~|~Minor bridge rehab > 20' span.~|~~|~A5A3B4B997608D7697E7AF55DDEF3D371D356854 89559~|~1~|~1~|~01/IMS~|~Spot paving and resurfacing on Interstate 75 SLM 0.00 to 8.88. From MIA/SHE County Line to Railroad Bridge at SLM 8.88. Miami from structure MIA 75 14.15 to MIA/SHE Cty Line SLM 19.96.~|~05 - 4R Maintenance - Resurfacing~|~483D284150D3CFF03786278C908DE273899E6BD0 127148~|~1~|~1~|~01/NHS~|~Plan split for eligible urban paving work items ~|~05 - 4R Maintenance - Resurfacing~|~71990BF96129E5348221102BBD6E589DFC342A32 127148~|~1~|~2~|~02/NHS~|~Plan split for 100% local items not eligible for urban paving funding~|~05 - 4R Maintenance - Resurfacing~|~8EECF354532A3F3190068340AB0A13BD9A15356F 87123~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using an asphalt overlay treatment. WAS 7 14.03-17.60. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A0B8707A63F92B962DACBDB8B9B5C4982C128FBF 87123~|~1~|~2~|~02/SAF~|~Recessed wet reflective markings on WAS 7 14.03-17.60.~|~05 - 4R Maintenance - Resurfacing~|~99399B2D93E17705F057FC64025B2D41C062BB5C 115419~|~1~|~1~|~01/NFP~|~Plan split for demolition work using State funds.~|~04 - Reconstruction - No Added Capacity~|~DBE3A3C24537F6B238E93493E4AAA07620A4730A 84507~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. ATH 144 0.00-4.57, ATH 329 12.19-13.66, and ATH 550 6.70-10.66, 12.13-14.63. Rural other federal aid route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E08FC4CCB29C48E66CCF614420495A7B2EC7AF49 84507~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a fine graded polymer treatment. ATH 682 6.14-7.75. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B7FAD76C1395078157EC7B8C166F4FC440ABB0EF 108030~|~1~|~1~|~01/NFP~|~Tree Cutting.~|~44 - Other~|~4895DE087300FC79BA63CB473DE8433E72CEBE31 92151~|~1~|~1~|~01/BRO~|~Bridge replacement project. ATH 329 14.40, SFN 0503576. Funded 100% state.~|~10 - Bridge Replacement~|~94EB5F373641239E315A29F7470B09DB91ABAF91 119084~|~1~|~1~|~01/IMS~|~Resurfacing.~|~17 - Construction Engineering~|~C7A4FA6E2EC0117C6FC5EFD94B44253D64CAA966 101694~|~1~|~1~|~01/NHS~|~NHS 80/20 District Allocation/City of Huron~|~05 - 4R Maintenance - Resurfacing~|~7CAF1FDC6E2661C4876519C66290872265ACADF3 101694~|~1~|~2~|~02/NHS~|~NHS 100% City of Huron~|~05 - 4R Maintenance - Resurfacing~|~13586B574B7802C677A1E979527728FD911D9381 109998~|~1~|~1~|~01/NHS~|~Guardrail~|~21 - Safety~|~3DAE8A7CAB5AC814C1455319395887CF16720C21 109998~|~1~|~2~|~02/SAE~|~Guardrail on MED-71 to close that existing gap where a fatal crash occurred last November.~|~21 - Safety~|~440C9B1651062DE0E16D38860E8ED18A51CDB966 76703~|~1~|~1~|~01/IMS~|~LUC IR75 6.7-8.37~|~04 - Reconstruction - No Added Capacity~|~8081B278C89147BA9F7F4AACF48429A1773A2EFA 125096~|~1~|~1~|~01/S5K~|~Replace a deficient bridge on Sherwood Drive over Martin Run.~|~10 - Bridge Replacement~|~351422B299D5EA74F023D3A3337D4543A164A935 95801~|~1~|~1~|~01/NHS~|~from SLM 5.04 to SLM 11.65~|~05 - 4R Maintenance - Resurfacing~|~2CD7E1C8A21504040F11AB95D13F9B4DDF584CCC 95801~|~1~|~2~|~02/NHS~|~WOO-6-6.85~|~13 - Bridge Rehabilitation~|~608B707194ACAB29F0BAB91016B6BC19B43395F4 95801~|~1~|~3~|~03/SAF~|~Center Line rumble stripes.~|~05 - 4R Maintenance - Resurfacing~|~572C5719D0055473DFA993297B311F824D4C2D07 89437~|~1~|~2~|~02/MPO~|~ Resurface and reconstruct Dayton Road on Dayton-Springfield Road from Enon North Corporation Limit to Springfield West Corporation Limit CLA CR 333 3.92 to 4.84.~|~05 - 4R Maintenance - Resurfacing~|~227BBFF07B664EE1214E88991BC29F412E3EA778 89437~|~1~|~3~|~03/MPO~|~ Resurface and reconstruct Dayton Road on Dayton-Springfield Road from Enon North Corporation Limit to Springfield West Corporation Limit CLA CR 333 7.27 to 8.99.~|~05 - 4R Maintenance - Resurfacing~|~8DA862F85C11869926166A91EC895D21BE065C37 89437~|~1~|~1~|~01/MPO~|~ Resurface and reconstruct Dayton Road on Dayton-Springfield Road from Enon North Corporation Limit to Springfield West Corporation Limit CLA CR 333 4.84 to 7.27.~|~05 - 4R Maintenance - Resurfacing~|~A3E57DB5DD7D2AD214D37A4C0E2439DD0FE2E255 92853~|~1~|~1~|~01/STR~|~ADA SR247 1.20 Slide Repair On SR247, 0.85 mile north of its US52 junction. 80 Fed/20 State01/STR/OT/State~|~21 - Safety~|~1DEB3F748752F76676420554AFD8FFB8D1D1E527 110134~|~1~|~1~|~01/STR~|~All routes except CRA SR 0039 00.00-03.40 & WAY SR 0604 04.27-07.56.~|~05 - 4R Maintenance - Resurfacing~|~4601CDEF77E2802DFD46267FB82EE029EBC42920 110134~|~1~|~2~|~02/NFA~|~ CRA SR 0039 00.00-03.40 & WAY SR 0604 04.27-07.56 Only on this split.~|~05 - 4R Maintenance - Resurfacing~|~E9846E0F57F6542B0D9F76CE5868D1C546ECAB52 111500~|~1~|~1~|~01/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): WAY-302-1.86 to 2.59 (LT)WAY-302-1.86 to 3.82(RT)~|~05 - 4R Maintenance - Resurfacing~|~E7D0FD1C2AAF50A82F789F7E5F184CF3F4BCB617 111500~|~1~|~2~|~02/S<2~|~100% Local (Wooster): Urbanized Area Inside Corp. Limit (Items Such as Pavement RepairWAY-302-1.86 to 2.59 (LT)WAY-302-1.86 to 3.82(RT)~|~05 - 4R Maintenance - Resurfacing~|~C161074EE8A7011D5D93AE06E68FF67B6F934228 111500~|~1~|~3~|~03/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?): WAY-SR 302: 2.59 to 03.82(LT)WAY-SR 83: 8.87 to 9.09 ~|~05 - 4R Maintenance - Resurfacing~|~7F1BB6C375A589D3916977875EB9A03D19561FB9 111500~|~1~|~4~|~04/NHS~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?): WAY-US 250: 14.44 to 14.60 (LT/RT)~|~05 - 4R Maintenance - Resurfacing~|~11BA43EC2A388D5803DA5849EA3E6200795EFA1C 102117~|~1~|~1~|~01/S<2~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A50A986190D6BE01043B3F73988FABF0CC61FD9F 105889~|~1~|~3~|~03/NHS~|~Main Interchange Plan split for SB Ramp Bridge.~|~08 - Bridge - New Construction~|~442E8608F4D4F1366217F5DDC4175B97FF36C331 105889~|~1~|~1~|~01/NHS~|~Main interchange plan split - Pavement - NHS Only~|~21 - Safety~|~9433FFA73D28ADEA522177B95F6E1B13F3A53CB1 105889~|~1~|~2~|~02/S>2~|~Plan Split for primary Interchange work - Non-NHS road segments~|~21 - Safety~|~16A82A6E304CCAEB6EF467BDC15F74CBA5CBBD20 105889~|~1~|~4~|~04/NHS~|~Plan Split for NB Ramp bridge replacement~|~10 - Bridge Replacement~|~B463CAB1965141A081457D5614FD6CD3ACA81AB7 105889~|~2~|~9~|~09/NHS~|~Plan Split for 100% Locally funded portions of Urban Paving scope in Sylvania - e.g. Full Depth Repairs~|~05 - 4R Maintenance - Resurfacing~|~6BA4F753B1B04678C159D2360026D1DC8FB237C5 105889~|~2~|~10~|~10/NHS~|~Plan Split for Non-Sylvania resurfacing on SR 51. Funding by District Allocation~|~05 - 4R Maintenance - Resurfacing~|~8768F5A6061114B02E9F79F68963CF5B9993388E 105889~|~2~|~8~|~08/NHS~|~Part 2 plan split for Urban paving of SR 51 from interchange termini to Whiteford road.~|~05 - 4R Maintenance - Resurfacing~|~5365D24BBE5EF45CA296A759A51AD7E7A4AA2037 105889~|~1~|~5~|~05/NHS~|~Plan split for widening and rehabilitation of LUC-51-1285L bridge & deck patching for LUC-23-1165L bridge - District 2 funds~|~13 - Bridge Rehabilitation~|~7AC17C0DF384C305BB56868F37CD86FA2EBD3480 105889~|~1~|~6~|~06/NHS~|~Plan split for vandal fence and bridge aesthetic upgrades for SFN 4805224~|~13 - Bridge Rehabilitation~|~F8EDC0C305B79D070F53D0A2537915B82E7722C5 105889~|~1~|~7~|~07/NHS~|~Bridge aesthetic items plan split~|~31 - Landscaping & Other Scenic Beautification~|~66AF4E4E773E6AD17E6B4EEC31CECAB03C54BD65 123454~|~1~|~1~|~01/STR~|~Resurfacing SR 9 from SLM 10.61 to SLM 13.59~|~05 - 4R Maintenance - Resurfacing~|~A28F532CC3821BD7A86842A46A5F97871C69FF38 123454~|~1~|~2~|~02/S50~|~Resurfacing SR 9 from SLM 13.59 to St. Clairsville (SLM 14.60)~|~05 - 4R Maintenance - Resurfacing~|~C6E52348E82D21F6DD465F60E8BF0F352D96D8CF 121302~|~1~|~1~|~01/STR~|~All Work is within this split~|~10 - Bridge Replacement~|~17F20E9D17BCF738501E331097295E400B90E2D4 112918~|~1~|~1~|~01/STR~|~ROS 50 0.00-4.00~|~05 - 4R Maintenance - Resurfacing~|~70669F2DFCF078061B5E1465B1E0653FFF218A00 112918~|~1~|~2~|~02/SAF~|~Centerline Rumble Stripe~|~21 - Safety~|~43B064BA6E8DD338A62C16040689F12DACBBE23C 112918~|~1~|~3~|~03/STR~|~Bridge maintenance.~|~47 - Bridge Preventive Maintenance~|~34CEF356C67C0FF6F63518A3BD15A7600D7B2A84 112918~|~4~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~~|~883F7AADB86D94E01ECA3DC52213CB98C68395DC 112918~|~1~|~5~|~05/NFP~|~Retro fuel price adjustment~|~21 - Safety~|~A1598DA860D03B11E5347CCDB184C710FB56304A 90358~|~1~|~1~|~01/STR~|~Culvert Replacement~|~~|~DA4F6C7F1B0F4912B3313E318E066B6652EEFF74 89541~|~1~|~1~|~01/SAF~|~This is a High Risk Rural Road funded project that proposes to eliminate a horizontal curve (approx. SLM 13.35) that is experiencing a high number of run off the road crashes that seem to be related to the deficient horizontal and vertical alignment at this location.~|~21 - Safety~|~FF9EDF695C4D41E6D3B9C31DE2DB0D75ED25925B 126037~|~1~|~1~|~01/IMS~|~Establish Funding~|~05 - 4R Maintenance - Resurfacing~|~E51D6923836687C6C45E9518AC57C4FC0CF68610 99615~|~1~|~1~|~01/IMS~|~Repair structure BEL-470-0322 (SFN 0706264) by removing the existing asphalt concrete overlay and providing a new rigid concrete overlay. Additional work to include replacement of parapets, backwalls, expansion joints and approach slabs, structural steel repairs to address section loss. Project will also remove a structure mounted traffic sign and place on an independent support. Vandal protection fencing will be added to the structure.~|~13 - Bridge Rehabilitation~|~E1E120EDEB7BDB73D34B02C15276E6651C07B3E0 116664~|~1~|~1~|~01/STR~|~plan split for the retaining wall/drainage repairs along WAR-350~|~04 - Reconstruction - No Added Capacity~|~11498D82FF0ADFD32827FDC08C1F7DA9DA4758B3 116664~|~2~|~2~|~02/STR~|~Culvert replacement on WAR SR 28. This the Part 2 plans under PID 125467 ~|~04 - Reconstruction - No Added Capacity~|~37B586FA84E8F122F0450BC00915A0F6C25FC251 101540~|~1~|~1~|~01/S<2~|~Sidewalk project along HIG Hobart/Carl Smith Drive.~|~44 - Other~|~7EF7C93B4E063ABBB52FED6D1BFACCEABB853396 123579~|~1~|~1~|~01/STR~|~All work within this split. Ellis will not allow Improvement Code to be selected and crashes often creating this funding event...~|~04 - Reconstruction - No Added Capacity~|~416EF6B4C8850F5F449280E12DEB4EDF04306D6E 105706~|~1~|~1~|~01/NFP~|~plan split~|~44 - Other~|~A6E6AB0C3CC079D5CE7E9FC75E4CC1D3ECE29C1E 121263~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A7638319FFE3BC9F9D9905319A484FEC0E76FBBD 110172~|~1~|~2~|~02/IMS~|~Line conduit.~|~04 - Reconstruction - No Added Capacity~|~21333CFCEA3520032D51A0ABD5D65F7227841A47 110172~|~1~|~3~|~03/STR~|~Structural spray lining of conduit~|~04 - Reconstruction - No Added Capacity~|~774F4E09D202062AF6E89E7D69E0C1A5FE4D2CD9 110172~|~1~|~1~|~01/S<2~|~Line 3 conduits. Jack and bore 2 conduits.~|~04 - Reconstruction - No Added Capacity~|~94F30348AA72401F1669206A0E961FB401DC80FF 100316~|~1~|~1~|~01/CMQ~|~Provide pedestrian access by constructing sidewalks along the south side of Lyons Rd. and then along the West side of SR 741.~|~28 - Facilities for Pedestrians & Bicycles~|~D1C008BF0C0438DDDD0C466B525A719859A710F4 100316~|~1~|~2~|~02/S>2~|~Making profile adjustments to the bridge to the roadway. installation of backer rod with joint repair to prevent the continuance of the ramping problem. Estimated 25 feet of resurfacing will also be needed.~|~17 - Construction Engineering~|~4EC6966744496E08D6208C570E5AE9FDA43F4DA0 125049~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A31081049C67A5AF27EF0DC90D7FB60D02BBFE58 118736~|~1~|~1~|~01/SAF~|~PM project in Scioto County.~|~21 - Safety~|~B0CF1DDD19B873A1DE3D4DD0B6E1F3EC952A3CD3 115123~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2DED770C420AAB425DF18D15C8B8AC93A06AC70B 93138~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Resurfacing with related work on Fai-SR 664-07.47 to 12.62~|~05 - 4R Maintenance - Resurfacing~|~F3C139D56C87B4ABEA7ED9BADF00E2034E1BF24C 110223~|~1~|~1~|~01/NFA~|~BRO 221 5.54 reactive maintenance.~|~48 - Bridge Protection~|~A9CF5D433325C154CEA8F0904D87FF43FCC5400E 89698~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for all enhancement eligible items of work.~|~28 - Facilities for Pedestrians & Bicycles~|~42E69A57E7BB750A9465E060F8A7FA0E0033A93D 106850~|~1~|~2~|~02/ENH~|~Trans. Alternatives funding for Sidewalk, curb and lighting~|~04 - Reconstruction - No Added Capacity~|~E992191BB30D5069105B11DBC9C4294CFF190AB4 106850~|~1~|~1~|~01/ENH~|~Reconstruction of Jefferson St - Pavement reconstruction items~|~04 - Reconstruction - No Added Capacity~|~0A2406BFA6A1CC1B6E84390C7D3D0E14DEE3AB4A 94961~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split.~|~44 - Other~|~AA93E8A0A581869F73B0D68607027292983217CF 116808~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing, urban paving in the city of Akron. (SR93 8.02-8.44)~|~17 - Construction Engineering~|~C39ED4FE3A17CF91B417CE3109EC646588261C52 116808~|~1~|~4~|~04/S>2/AKRO~|~100% City Items including asphalt pavement repairs and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~82C60E7EEE71BA9A1339FF576D425A4981C4EE65 116808~|~1~|~3~|~03/NHS~|~Resurfacing outside of City of Akron (SR93 7.78-8.02)~|~05 - 4R Maintenance - Resurfacing~|~0A8065D1B97691E560D231079940E9B2FDBEC077 116808~|~1~|~2~|~02/S>2/AKRO~|~Resurfacing, urban paving in the city of Akron. (SR93 8.44-9.13 & 9.52-9.84 along with all ramps)~|~05 - 4R Maintenance - Resurfacing~|~6186EC243B972D84A6B7B4B72CF6A371A7ABC0ED 88846~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% federal STP) / 4PS7 (20% state) - No cap - Resurfacing on SR67 in Hardin County from the Auglaize County line at slm 0.00 to Jct. SR 117 (overlap with SR 117) at 1.59; on SR117 in Hardin County from Jct. SR 67 slm 1.59 to the Logan County line at 6.14; and, on SR235 in Hardin County from the Logan County line at slm 0.00 to SR 117 at 0.44.~|~05 - 4R Maintenance - Resurfacing~|~308A9E1F0328D82EFBC7506C1E0F40D561FC101D 101771~|~1~|~1~|~01/MPO~|~Widening of Maple Avenue to provide bike lanes, pavement repair and resurfacing, upgrade of traffic signals at two intersections, installation of rectangular rapid flashing beacons (RRFBs) at unsignalized pedestrian crossings, and application of new pavement markings.~|~04 - Reconstruction - No Added Capacity~|~8662143D86F6ECEE6AA3175853191C1BF8A4D69B 101771~|~1~|~2~|~02/MPO~|~Plan split for 100% Local Water Line work.~|~43 - Utilities~|~FA49DE1D99F0F78E8CEA5823C4D17FD9FEDE5903 116247~|~1~|~1~|~01/STR~|~AC Overlay with Repairs ~|~05 - 4R Maintenance - Resurfacing~|~4E2BA21A3EF6F778E4844F10A46BB0C213846F2B 116247~|~1~|~2~|~02/S5K~|~Overlay on BRO-41~|~05 - 4R Maintenance - Resurfacing~|~B34C1D8095C05B85F83D8A836C3336E803779B07 116247~|~1~|~3~|~03/STR~|~Overlay on BRO-41- Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~7D38703CEA06457C3FBC77AF8B94EAF12F4019F4 90463~|~1~|~1~|~01/CMQ/NC~|~Traffic signal coordination / upgrade along North Main Street between Everhard Road and Applegrove Street, in the City of North Canton, Stark County, Ohio.~|~21 - Safety~|~89093E3A175CA557132026B85F7143C32D40E133 125734~|~1~|~1~|~01/NHS~|~Bridge work throughout District 5.~|~13 - Bridge Rehabilitation~|~866F1B636579C82DAF71B413E498F9584F03E355 123994~|~1~|~1~|~01/SAF~|~Roadway departure countermeasures with Safety funding.~|~21 - Safety~|~B6EF963201BBA950E985DC4F75E4358732F9C084 123994~|~1~|~2~|~02/NFP~|~Locally funded safety improvements~|~21 - Safety~|~FA16FBCC1072CF76F6378BD563D31935CB5BE664 120812~|~1~|~1~|~01/ENH~|~Shared use path repairs utilizing 100% Federal funds (TAP and Safety) up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~20B5FD68438C4B102FF8AC6483B123DA8CC105A6 126215~|~1~|~1~|~01/NHS~|~Two year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5m.~|~17 - Construction Engineering~|~A6D53EC06C5977FA38FE5000FBDE7336ECF47BEC 109722~|~1~|~1~|~01/STR~|~Landslide repair project NOB 340 4.10 using 100% State (4BE7) funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~481286055C35D4CF971DDA406698D68728992A1D 98252~|~1~|~1~|~01/STR~|~Preventive Maintenance - Chipseal~|~05 - 4R Maintenance - Resurfacing~|~1E815BEBF4449B736BF4DD2870AB734FA71967D2 107348~|~1~|~1~|~01/NFP~|~D09 Bridge Debris Removal FY19PIK-32-13.74L SFN 6601669PIK-23-8.37R SFN 6600328PIK-23-11.56 SFN 6600573ROS-23-9.26L SFN 7100396ROS-50-19.26 SFN 7103301ROS-159-0.42 SFN 7104189ROS-35-19.19L SFN 7101988ROS-35-19.19R SFN 7102011SCI-348-17.51 SFN 7305796~|~47 - Bridge Preventive Maintenance~|~A9338F15AF0B704C22E60F426D8AB7B60D73E7C6 76009~|~1~|~1~|~01/STR~|~Federal Emergency project Disaster event OH11-01 DSR COL-024 to fix landslide and rockfall site.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CA2A5A8A48DA7DF7B49594B3B8CB9153939D58B9 84562~|~1~|~1~|~01/S>2~|~Plan Split for MAH SR 170 12.56 to 15.54 and MAH US 62 19.57 to 21.61.~|~05 - 4R Maintenance - Resurfacing~|~372CEB700EC298C62E48E70B7534969CBC07DB66 112861~|~1~|~1~|~01/NHS~|~Smoothseal on PIK 32~|~05 - 4R Maintenance - Resurfacing~|~89B3378CEE9811BC19BFD96A7AACEC1C2515A74C 119262~|~1~|~1~|~01/IMS~|~Mowing.~|~44 - Other~|~A8D4237E9AD14D41E5010D6F0B899E5B10B818B0 116723~|~1~|~1~|~01/NFA~|~All work is in this plan split.~|~21 - Safety~|~D3026121C1F4D7D1F94FE01B283661941A901923 104875~|~1~|~1~|~01/IMS~|~Mowing contract in Clinton, Greene, Preble and Warren counties.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C29C2F8F0866785594303B73EC6184EDAB22A8D 100772~|~1~|~1~|~01/STR~|~Resurfacing HOL-83 from SR 39 to the Holmesville NCL, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~DF188D34D7531770B4B93C908EEAE9E45B93FF4F 97656~|~1~|~1~|~01/SAF~|~Install HAWKs signals on Hayden Rd and Morse Rd~|~21 - Safety~|~2D8F1C3E8F679D50893CE8F9CCF97E9296AF3798 84882~|~1~|~1~|~01/BRF/FCEO~|~"01/BRF/BR/FCEO" Fairfield County project to replace existing structure on Twsp Road 160 (Ducan Road) over Muddy Prairie Run with new structure. CEAO Federal Max of $557,600~|~10 - Bridge Replacement~|~220F615C1C93C5BB3B04B143F38B1F18F3D2241F 112420~|~1~|~1~|~01/IMS~|~Fine poly AC overlay~|~17 - Construction Engineering~|~F171BCA3E6F4FDCEA50CA784A0227CC47A735255 85688~|~1~|~1~|~01/BRO~|~Replace deck and steel on Hudson over I-71, BR eligible.01/BRO/BR/~|~13 - Bridge Rehabilitation~|~E1AECF791964C48B9948019C57CF98061877F34D 85688~|~1~|~2~|~02/BRO~|~100% items requested by the City of Columbus~|~13 - Bridge Rehabilitation~|~7C226AFAED3A72F14120EFE2D3FEAA4589B02346 114183~|~1~|~1~|~01/MPO~|~Application of a Biorestor Asphalt Rejuvenator on both trails; also replacing a failing culvert south of Husted Road on the Little Miami Scenic Trail~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~49C26B20964E91B931513EB68220C58C48F0D43E 85106~|~1~|~1~|~01/STR~|~General system resurfacing of BEL-147 Nob. Co. line to Belmont WCL; includes pavement, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~2A7A821F8FE62C12203BD9959F29709919409177 126771~|~1~|~1~|~01/STR~|~Rehabilitation of bridge (SFN 4202627) over Isaacs Run on SR 95 (Ankneytown Rd) in Knox County.~|~13 - Bridge Rehabilitation~|~BA903A08909B4100E49A7810CE6A78EA9EFAC4B0 100883~|~1~|~2~|~02/SAF~|~Type A End Treatment upgrades using safety funding.~|~21 - Safety~|~94324FAF3BAB2C9F1A787C79AAA9E91A57F31A64 100883~|~1~|~1~|~01/STR~|~D09 Guardrail Project FY21 - LAW 775 7.16-7.22~|~44 - Other~|~2572D26023B3DA1755CE6B5D1352021EA045DFE7 95212~|~1~|~1~|~01/STR~|~Mowing Contract~|~44 - Other~|~BF43B4EFB0CFB8B2B9ADC54F861B30D88B6CA39D 103167~|~1~|~1~|~01/IMS~|~Split for sign support repair~|~99 - State Preventative Maintenance~|~1ECBC705A3A7D4425651494F0F8DE89C48D814C3 107513~|~1~|~1~|~01/STR~|~Resurfacing JEF-213~|~05 - 4R Maintenance - Resurfacing~|~8C8559C00CDBA406135CEFE59DE08A185471DB19 92024~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 1809873; CUY-175-1273~|~10 - Bridge Replacement~|~88D788AF4A1C646DD343F9AA35740BCC812C40FC 87825~|~1~|~3~|~03/BRO~|~BR Funded Bridges: 8705852 WOO IR280 4.48 Intersect: Cedar Creek 8705887 WOO IR280 4.53 Intersect: Cedar Creek 8705917 WOO IR280 5.02 Intersect: Dry Creek 8705941 WOO IR280 5.24 Intersect: Norfolk Southern Rr~|~13 - Bridge Rehabilitation~|~004FCF2CA93B4C2F5762BB25ECECF22413BEDC74 87825~|~1~|~1~|~01/IMS~|~resurface Interstate sections LUC IR280 0-1.62 and WOO IR280 3.73-6.63~|~05 - 4R Maintenance - Resurfacing~|~502A2863122A670D136069597DEF9BA87BF44E1D 87825~|~1~|~2~|~02/IMS~|~8705909 WOO IR280 4.58 Intersect: Cedar Creek ( Non BR eligible )~|~13 - Bridge Rehabilitation~|~D1999AE8F26382244C1D355ABA44D2F640415501 103396~|~1~|~1~|~01/STR~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F98EA2F74B35747BCE3958EA63AC5BB29D8DD510 125860~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~B6A1CA8147EFED287519905681CCA75F81CD271E 125860~|~1~|~2~|~02/STR~|~Bridge preventive maintenance~|~47 - Bridge Preventive Maintenance~|~60C65EE0274E4C8A2D4A8F7C901910453B7EABD8 78425~|~1~|~1~|~01/IMS~|~Multi lane minor rehabilitation pavement project milling off 7" and replacing 8 1/4" on MIA 75 SLM 18.90 to 19.954 and SHE IR 75 0.00 to 8.10~|~05 - 4R Maintenance - Resurfacing~|~6C550DEF40DBE028AAB79F0627A34638B6F6CE7A 78425~|~1~|~2~|~02/IMS~|~Painting of structural steel on SFN 7501447~|~05 - 4R Maintenance - Resurfacing~|~6FE547D790D83668F76FDF803EF14807F41FC6E9 87607~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - Project Impact Advisory Council (PIAC) Funding 5PI7 (80% Federal) / 4PI7 (20% State) - CAP = $2,100,000.00 for CO; District to provide corresponding CE costs - MOT during grouting operations on Mus-IR 70-15.24 to 15.89.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3AC7AD89B1004F390B60A3073C40F06752AFF0AA 87607~|~1~|~2~|~02/IMS~|~"02/IMS/PV/ " - Geological Site Management 4SF7 (50% Federal)/4SS7(50% State) - Total Project Construction CAP 4SF7/4SS7=$5,688,102.00; - Resurfacing after Mine Void filling on Mus-IR 70-15.24 to 15.89~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B7C1016CB7A5303C3ED8CF7880576752AF11C49 87607~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management 4SF7 (50% Federal)/4SS7(50% State) - Total Project Construction CAP 4SF7/4SS7=$5,688,102.00 - Mine Void filling on Mus-IR 70-15.24 to 15.89~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~57859C66B051FE614356A7F62818989A40018EF2 87607~|~2~|~4~|~04/S<2~|~"04/S<2/OT/ " - Geological Site Management 4SF7 (50% Federal)/4SS7(50% State) - Total Project Construction CAP 4SF7/4SS7=$5,688,102.00; - Mine Void filling on Mus-SR 93-12.92 to 12.94~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~93C2ECA11A12C8CC374EA5BA138FF224FE6E8E8F 110410~|~1~|~1~|~01/NHS~|~Rehabilitate structure JEF-7-1185 (SFN 4100484).~|~13 - Bridge Rehabilitation~|~1898C066884D82501C6D24EEB8253DAAEE8700DC 124917~|~1~|~1~|~01/NFA~|~Culvert replacement JEF-646-8.13~|~04 - Reconstruction - No Added Capacity~|~46631A76204E735F801CD948806CB9E2E089DF38 124917~|~1~|~2~|~02/STR~|~Culvert replacement JEF-152-4.73.~|~04 - Reconstruction - No Added Capacity~|~8F080E154679082DC43BA7A2FD4F18425F91B964 104324~|~1~|~1~|~01/NHS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~E8AB32BEC7B0A914B9333E65AA2D108FA39E16D7 90815~|~1~|~1~|~01/NFP~|~This is a project for the construction of a mix shed at the Belmont County St. Clairsville outpost.~|~44 - Other~|~AF3CE3B39262C595B65AF249BC16E70842DB0C77 115425~|~1~|~1~|~01/NHS~|~Construct new interchange at US 23 and SR 762~|~01 - New Construction~|~CF69161683C28708C264718B4062143CCBA27833 82442~|~1~|~1~|~01/IMS~|~Fine graded overlay of IR75 in Montgomery County:MOT IR 75 SLM 19.89 to 24.42~|~05 - 4R Maintenance - Resurfacing~|~504000EBCD7E65D3114411BE45F388B83B151228 82442~|~1~|~3~|~03/IMS~|~Repairing and/or replacing deteriorated sections of median barrier wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9238EC40C792AD066E36EFCE6923600E9C1AD53B 82442~|~1~|~2~|~02/IMS~|~Patching of Interstate Bridges.~|~13 - Bridge Rehabilitation~|~81DFCAC7874230D9BEC02FD86CA7F0EFB0E2A65A 97239~|~1~|~1~|~01/STR~|~BRO US 52 11.51~|~04 - Reconstruction - No Added Capacity~|~F340B37F0B1BF9EDC3C382701FEB10C5D995AEC3 108258~|~1~|~1~|~01/CMQ~|~upgrading signals and replace pavement markings eligible for federal-aid~|~21 - Safety~|~F009344D8A023695BBBC8432A53FFA8BA4E5355F 108258~|~1~|~2~|~02/MPO~|~Detroit Road Pedestrian improvements eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~BD347DCF60CCC62BB8659E53EA068FA2FAC74F1B 108258~|~1~|~3~|~03/NFP~|~Plan split for 100% local work~|~28 - Facilities for Pedestrians & Bicycles~|~DA42F214EF570DC134F8EC776C91533A959D9D67 109741~|~1~|~1~|~01/S<2~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~4A883E84D7CDBF3F6793B932AB445F8942AAE85E 109741~|~1~|~2~|~02/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~7368D0339B283799658257010E3DED9810DCDA29 109741~|~1~|~3~|~03/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~0A70B9D248222383E74DCE21397484CAF4EAF925 99865~|~1~|~1~|~01/STR~|~SFN 5401895 - Rebuild left deck edge & seal with epoxy-urethane sealer. Place cover material (rock/stone) over/around footing (rear). Redo piling encasements (remove & replace). Patch pier cap spalling. Rebuild deteriorated wing walls. Place scour protection around pier column encasements.SFN 5401925 - Rebuild deck edges & seal with epoxy-urethane sealer. Place cover material (rock/Stone over/around abut footing. Rebuild wing walls.SFN 5401984 - Rebuild deck edges and seal with epoxy-urethane sealer. Encase rear pier columns.~|~13 - Bridge Rehabilitation~|~94942FA013BD2F72A4B62BA70EDCE3A938E7D4A3 99865~|~1~|~2~|~02/S<2~|~SFN 7503423 - Abutment patching with Item 519. Investigate epoxy injection of abutment vertical cracks. Seal abutments with epoxy-urethan sealer. Encase pier columns.~|~13 - Bridge Rehabilitation~|~9A40A1A6526B96923B8B7431D41B70E029D4A56B 99865~|~1~|~3~|~03/NFA~|~Bridge rehab on bridge that is not on the Federal Aid System~|~13 - Bridge Rehabilitation~|~B5D6D7DF85FACC8DC72AFAE5261EE06AEFC6384F 116067~|~1~|~1~|~01/STR~|~Resurface with Asphalt Concrete~|~17 - Construction Engineering~|~CB237D868F4C5DF69E59A9DB86F0A81FBAFA2772 116067~|~1~|~2~|~02/NFA~|~Resurface with Asphalt Concrete~|~17 - Construction Engineering~|~2435E1D09337ED4CB8C4F931F792604314380159 111668~|~1~|~1~|~01/SAF~|~Safety project that includes pavement marking updates, signal improvements, lighting improvements, sidewalk improvements and accessibility improvements in the City of Athens. Work will take place on State Street and Washington Street. Funded through the TAP Program.~|~17 - Construction Engineering~|~67BD3D660AC7323AADC1E1CA136DEA06414A1F1A 107959~|~1~|~1~|~01/NHS~|~OTT 2 from SLM 16.53 to 23.29~|~05 - 4R Maintenance - Resurfacing~|~9FFAF07411E996B370C46DA60A8F4B440E5AA6C7 107959~|~1~|~2~|~02/NHS~|~Split for Bridge Work~|~48 - Bridge Protection~|~57CB3099D284147D36FC1E200FA0771BF971993E 107959~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~12BD21D4511375BFB106522484229DE951615508 83993~|~2~|~2~|~02/STR~|~General System asphalt resurfacing of COL-39-7.19 to 13.15 and JEF-152-25.86 to 26.38; includes pavement repairs, pavement marking curb ramps as required~|~04 - Reconstruction - No Added Capacity~|~105860A46FE2209BFC394AAF810EE24D00FEF4E8 83993~|~1~|~1~|~01/S<2~|~General System asphalt resurfacing of COL-39-13.15 to 15.57; includes pavement repairs, pavement marking~|~04 - Reconstruction - No Added Capacity~|~688DFFE00675FBE95637DF981C3ADEA826DBA5FB 13631~|~1~|~1~|~01/BRF~|~Replace two Brdgs on SR763. Project begins 1.25 miles south of SR 353. 0804142 BRO SR763 11.5 Intersect: Trib W Fork Eagle Creek0804177 BRO SR763 11.6 Intersect: Trib W Fork Eagle CreekBoth Structures are eligible for BR funds. Project Description: It is proposed to replace the existing deficient structures on SR763 over the tributary of West Fork Eagle Creek and necessary approach work. 80% Fed/20% State01/BRF/BR/State~|~10 - Bridge Replacement~|~12AB0CF734EEC7B14D495BD8DD031C56276818C3 119050~|~1~|~2~|~02/IMS~|~All work on bridges classified as being on Interstate routes.~|~47 - Bridge Preventive Maintenance~|~BC02784E73C504F8A67EE1B25B3B05475825493D 119050~|~1~|~1~|~01/STR~|~All work on bridges included under the STP Rural classification. ~|~47 - Bridge Preventive Maintenance~|~FCB39B96E9E528D25CEBC52244AC717E324DC8AB 108082~|~1~|~1~|~01/STR~|~Plan split is for Pavement Marking Fast Dry~|~44 - Other~|~1BB05BEC588EA8965BD769AD9103541055A7CCF4 116721~|~1~|~1~|~01/STR~|~Culvert Replacement MEG 689 1.87 CFN:1881039~|~17 - Construction Engineering~|~E95D74EE3E60DC401E93871E35E397214F24DB28 100753~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 255 0.00-18.08. Not on any federal aid system funded 100 state.~|~17 - Construction Engineering~|~F1C3B435C06764BA388A85A6ED131EA144F436DF 100753~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment with repairs. MRG 78 18.91-23.70 and NOB 340 0.71-7.01. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~90EAB45409BC08C1F89BD8AD27030B7807FB5F5F 100753~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG-376-0.00-9.73, MOE-260-4.33-11.32, MRG-555-15.33-22.95, NOB-566-0.00-4.80, WAS-676-12.42-22.06 and NOB 340 7.01-7.08. Urban other federal aid funded 80 federal/20 state.~|~17 - Construction Engineering~|~8E109D93BA1B4C61C168F3B04AA8ACB952AEBB23 76793~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~0CC8474F5494B4D1DF9860AE5E1FD058CEA89940 125426~|~1~|~1~|~01/NFP~|~FY32 Guardrail plan split.~|~21 - Safety~|~65F6FC4B3D01C40F89DBEBD4B3BEE6145AF4586C 127215~|~1~|~1~|~01/MPO~|~Created Plan split for TA funds.~|~28 - Facilities for Pedestrians & Bicycles~|~4C92CEDC369500737EE98E29E97566A5271EC194 111498~|~1~|~1~|~01/STR~|~All work is in this plan split using 100% state funds from SAC 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D4426730B2BCF26F82CBC5A23E63659BC095C26 91920~|~1~|~1~|~01/NFP~|~100% 4CP7/Maint. funds for 1 year Guardrail Ding and Dent Repair~|~21 - Safety~|~0DD61ACD724B51706F75D64C5DBB75F1199944A1 98629~|~1~|~1~|~01/STR~|~Underground mine repair~|~44 - Other~|~8618B80F99EED7B138DBA7383476BC5CF6BC19CD 103178~|~1~|~1~|~01/S>2~|~Reconstruction including new street pavement, curb, sidewalk, street lights and catch basins in the City of Dayton.~|~04 - Reconstruction - No Added Capacity~|~6BF96A965B0710825DF8C97BB69C37A9AFE0F2A9 95405~|~1~|~1~|~01/NHS~|~Properly locate approach slab to slab deck joint and then center polymer modifies expansion joint system on 6 bridges on US 68 in Clark County. SFNs 1203061, 1203096, 1203185, 1203215, 1203304, 1203339.~|~13 - Bridge Rehabilitation~|~34A11B14C3048B7581B2CE1B2DB12BF7D0B6BF6B 101997~|~1~|~1~|~01/NFP~|~Installing raised pavement markings along various routes throughout District 4.~|~21 - Safety~|~5F43DCC210841A8718B53BB9672A1DBEC6625C35 116748~|~1~|~1~|~01/IMS~|~Culvert plan split for FRA-71-28.865.~|~44 - Other~|~0BD281D37306A4F092C4F4DD4D4A1D20B678437D 114974~|~1~|~1~|~01/STR~|~All work is in this plan split funded by district allocations using SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~9B03E78757A3ADA086F2C4B649EB0E79EC3C5732 112807~|~1~|~1~|~01/STR~|~Resurfacing SR 46, SR 170 and SR 154~|~05 - 4R Maintenance - Resurfacing~|~FFF5E5A1024A3907EE189BA57F2F4D22E40E886A 109686~|~1~|~1~|~01/STR~|~Resurfacing US 62~|~05 - 4R Maintenance - Resurfacing~|~29219F0F8F118C0064F329F0D5FB9A1512801FD7 104300~|~1~|~1~|~01/MPO~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~6459EC57E14722D2B9B68A534BBBA4687D9D07B3 125575~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~7490271444D408339CC6B7EFBB73F753A9340CE1 120118~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~44 - Other~|~87C84E78310719A657CE4E6B04A618EC9C23AC13 115348~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~56EF12CF7F4E19BA456E9A2CEF2B82990A311FE7 88289~|~1~|~1~|~01/SAE~|~100% federal safe routes to school funding~|~21 - Safety~|~93F046752C693DB6D48993CDAB1515384483E234 101422~|~1~|~1~|~01/NHS~|~AC Overlay with repairs - GRE US 35 SLM 0.00 to 1.12~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C6C3640362B73A1F7F7576D976136B41857ACAF4 115833~|~1~|~1~|~01/NFP~|~FY 2022 pavement preventive maintenance on various Routes in ATB, MAH and TRU Counties. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3A71EEB2D4D4D64BFAACC9013510BB1155F428CD 76766~|~1~|~1~|~01/IMS~|~100% UNFU funding split~|~~|~B5FE417359823BA5D4DA7B9463AAB67DFE6ACA5B 98549~|~1~|~1~|~01/IMS~|~Generic Plan Split for crack sealing interstate routes. Routes to be determined~|~99 - State Preventative Maintenance~|~31F7DDE27A26D165AF1AA57D332723C489253B43 88735~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill~|~44 - Other~|~C8EEC413128386F7932AC69D4C59B90CB98CC992 95660~|~1~|~1~|~01/NHS~|~The project is for the deck replacement of Bridge HAS-250-0780 (SFN 3401650). The existing structure is deficient in Load carrying capacity and the deck will be replaced.~|~10 - Bridge Replacement~|~7808CCD03A6BE4C5C278EA31A306538C5B96AB28 117621~|~1~|~1~|~01/SAF~|~Pavement slip due the CSX railroad cutting an access driveway along the toe of the slope inside ODOT R/W.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D94F3D807017D4A5413CC70C5CEC8245524DBABF 124887~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~7A8AFA9073C44910816192DD7323D6C3913040A5 113741~|~1~|~1~|~01/SAF~|~Plan split for safety related improvements~|~21 - Safety~|~12360AC7DE24E4BCDE787C3DA7D0259C0F07165C 102566~|~1~|~1~|~01/NFP~|~Facilities special project. SAC LBP7 funds from Central Office.~|~44 - Other~|~8D90A448C4C1AF839F3E22B151FD076F0BA1E895 93159~|~1~|~1~|~01/IMS~|~100% state noise wall funding for design build noise wall on I-27001/IMS/OT/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9DCBC5B67023841AC682E9FB3562DDA5E0CE0CEB 101999~|~1~|~1~|~01/NFP~|~2-Year Lighting maintenance and repair along various routes in Ashtabula, Mahoning and Trumbull Counties.~|~21 - Safety~|~905B259354C8BD3D0C6E2EF744A6005DD36ACD2B 101999~|~1~|~2~|~02/NFP~|~LED luminaire upgrade.~|~21 - Safety~|~69A7457D915D53A875FD982158DF9997CF95AAF5 93025~|~1~|~4~|~04/IMS~|~Facilities ADA Funding 4AC7 (100% State) - See CAP Comment - Making ADA related deficiencies repairs/upgrades at the Mus-IR 70-13.90 WB Rest Area Park 20.~|~05 - 4R Maintenance - Resurfacing~|~74CA6552D2C25081D4620228D3CC873FD30F427E 93025~|~1~|~3~|~03/IMS~|~Facilities Rest Area Funding 4BR7 (100% State) - No CAP -Resurfacing with repairs of Mus-IR 70 WB Rest Area Park 20.~|~05 - 4R Maintenance - Resurfacing~|~A17B1F0D54EBAD3C9E785E87350C9F1EA87EEBD0 93025~|~1~|~1~|~01/IMS~|~District Preservation 4PF7 (48% Federal) / 4PS7 (52% State) - No CAP - Resurfacing with related work on Mus-IR 70-13.90 to 21.44~|~05 - 4R Maintenance - Resurfacing~|~99A3A585130A40100A7B134FBBD05AC64C6C8E3B 93025~|~1~|~2~|~02/IMS~|~District Preservation 4PF7 (48% Federal) / 4PS7 (52% State) - No CAP - Deck Sealing of 15 bridges along Mus-IR 70-13.22 to 21.44~|~47 - Bridge Preventive Maintenance~|~5D63F7EB979EF3FE4810F5FDE8DFD0FA7123C938 94075~|~1~|~1~|~01/NHS~|~Slide Repair OH11-02 DSR PIK-009 On SR32, 0.10 mile east of the railroad underpass, it is proposed to repair the slip.01/NHS/OT/State80/20 split using ER funds 01/NHS/OT/State~|~44 - Other~|~519674C4306023B3858DCD7F279DB875A1A4C006 112431~|~1~|~1~|~01/STR~|~Culvert replacement project. GAL 554 10.17 (CFN 1833132) and 12.63 (CFN 1833140). Rural other federal aid funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~C42DD6C180CFE800EBA99BE9F4D5C7E1A45A681D 118682~|~1~|~1~|~01/S50/NEWA~|~Resurfacing of various streets in Newark~|~05 - 4R Maintenance - Resurfacing~|~42AEFC5575A340AF98918EC72F324F8F345FF862 90359~|~1~|~1~|~01/STR~|~Drainage System Maintenance/Repair~|~44 - Other~|~8FFEF0D3EFF855CDA56C6731F4920FE0170BDFEB 98144~|~1~|~1~|~01/NHS~|~HNS 80/20 Bridge Deck Overlay Non-BR FRA-33-26.49 L/R over Blacklick Creek~|~13 - Bridge Rehabilitation~|~16025DFD914E824CCBD84DEFE31657D15CD6C6B7 105947~|~1~|~1~|~01/SAE/PCEO~|~Perry County/CEAO HSIP Funding - 4HB7 (100% Federal) - See CAP Comments - Upgrade existing guardrail on various county roads in Perry County.~|~21 - Safety~|~2377B593610859B5A6E21F7E0ABF82B58C349DF1 114489~|~1~|~1~|~01/IMS~|~Plan split for PPM work on the interstate~|~05 - 4R Maintenance - Resurfacing~|~C169264335B41503FBB6ABFD79090755B7BF4F6D 114489~|~1~|~3~|~03/NFA~|~Create plan split for preventive maintenance on state route not on the federal aid system~|~05 - 4R Maintenance - Resurfacing~|~F22A691495235F448EBF053552D9B3FAC5BC6B98 114489~|~1~|~2~|~02/NHS~|~Split for paving on NHS network~|~05 - 4R Maintenance - Resurfacing~|~3CDE8A9555A2AB7B2363BD9B0F6B9065DDCBAC7E 110740~|~1~|~1~|~01/MPO~|~Realignment of the Community Park driveway with SR 123 to a 90 degree intersection across from the new Hampton Bennett Early Childhood Center. Construction of a new signal with pedestrian crossing accommodations.~|~21 - Safety~|~8356BDD90322FFEFD77B2E90508E9BC724E14A20 88484~|~1~|~1~|~01/BRF~|~Replace/Rehab Bridge, add sidewalks on SFN 1260928 MCLAMR **C : 0.000 : 0.000 Fountain Avenue at 0.14 MI North of North Street in Springfield.~|~10 - Bridge Replacement~|~A9E044577D16C6387FF278405478C0A57FE7A869 105905~|~1~|~1~|~01/NHS~|~Plan split for urban paving work~|~05 - 4R Maintenance - Resurfacing~|~8BC6F5E8D77908AB4DCFD9218A97F990EA2DF8DD 105905~|~1~|~2~|~02/NFP~|~Split 2 for 100% local items of work.~|~05 - 4R Maintenance - Resurfacing~|~B765B48B163B1160005E7A48C6FD268FDE49B7DF 105905~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~3A4B3A99098A38AA56CFA6AB567F43990B97781F 98520~|~1~|~1~|~01/BRO~|~District Preservation Program funds.~|~10 - Bridge Replacement~|~F0169027968CCA028C03634FD3481C50920DBD74 122200~|~1~|~1~|~01/NFP~|~All items of work associated with the installation of QWS in Franklin County~|~24 - Traffic Management Engineering - HOV~|~4F6A149E35AABEE0187C16509C63EC89D15DEA61 113606~|~1~|~1~|~01/IMS~|~Building demo.~|~44 - Other~|~7129D3CD2D910E6651D0750F45C1F97E5F7D44E7 79667~|~1~|~1~|~01/IMS~|~Priority system resurfacing of FRA-70: 7.60-11.21 (Wilson to Broad)01/IMS/PV/~|~~|~252363AEE30738826C1D1EDE159F95AE5228410E 79667~|~1~|~3~|~03/BRO~|~Concrete deck overlay & abutment repair on 1 structure:2504332 FRA CR22 9.1 Intersect: Over Fisher Rd03/BRO/BR/ (BR eligible work)~|~~|~6A7442D40F029208BAAF6930D6DED74ED4CBD953 79667~|~1~|~2~|~02/IMS~|~Minor bridge work (patching, sealing on 5 structures:2504316 FRA IR70 8.93 Intersect: Over Hague Ave2504510 FRA IR70 10.17 Intersect: Over Harper Rd2504529 FRA IR70 10.17 Intersect: Over Harper Rd2504545 FRA IR70 10.63 Intersect: Over Ns Rr2504588 FRA US40 11.21 Intersect: Over Us40 (Broad St)02/IMS/BR/ (not BR eligible)~|~~|~F88A1FA417867BAA0F3E833C5BCFD8501553288D 116640~|~1~|~1~|~01/NHS~|~NHS Plan split for resurfacing and resurfacing related items for PIC-23-5.21-12.92.~|~05 - 4R Maintenance - Resurfacing~|~17F3B7FD73283BE19AECF8F89D7896F3E3D04009 95369~|~1~|~1~|~01/NHS~|~Replacing structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~F3AB62E0607305E2A8D00615CB3CCA55E4CC38F3 116935~|~1~|~1~|~01/BRO~|~Emergency A Repair~|~13 - Bridge Rehabilitation~|~6A8E013F2E327C8976933C191370E3D5BFAE4469 80252~|~1~|~1~|~01/S>2~|~Change order for 2010 project~|~~|~0A20279C910D1A968F81BD4E2170A671DA49B849 126474~|~1~|~1~|~01/NFP~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8C1E9989FBF7438003D34BD1C3125C28CFD43576 126474~|~1~|~2~|~02/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B6464C30EC23EF4D8E029D98141572AA23C4477E 126474~|~1~|~3~|~03/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~790A432F8B6887EB65869F18AE04815F3EC98AA7 86292~|~1~|~1~|~01/BRO~|~Deck replaced & 1 or 2 beams replaced, BR eligible2517493 FRA IR270 3.76 Intersect: Cleveland Ave. Over I-270~|~13 - Bridge Rehabilitation~|~3FA08C801CACA383836807D4F5C78B5BE50FF1DC 86292~|~1~|~2~|~02/SAF~|~Safety funding for removal of 270 WB to Cleveland Ave NB slip ramp (Ramp D). D6 funding for other ramp improvements not funded with safety funding~|~21 - Safety~|~D39B9E23C25F00478A4B1B6E4E10F185DB0BF06C 86292~|~1~|~3~|~03/BRO~|~Change order for extra work due to utility delay. AT&T to reimburse ODOT~|~13 - Bridge Rehabilitation~|~F205108CAA0010E493FFEF5B9D3D48725E75B587 102159~|~1~|~1~|~01/S<2~|~Urban paving within City of IrontonLAW 93 0.69-1.37 & 1.62-1.82~|~05 - 4R Maintenance - Resurfacing~|~15B973057A3BB5AA8C390BA849DE4D74468405EB 102159~|~1~|~2~|~02/S<2~|~LAW 93 1.37-1.6280/20 Fed/State~|~05 - 4R Maintenance - Resurfacing~|~C5DA0624656B5ADB8E72DA11445D0454FB89D259 110991~|~1~|~1~|~01/SAE~|~Improve the SR 32 and 8 Mile Rd intersection by installing a signalized Green T intersection and improving the profile grade on 8 Mile Rd~|~21 - Safety~|~626DDCC982744DB67C3DB54E43E7595F9B91767E 110991~|~1~|~2~|~02/S>2~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54622144DDAFCB1FC07DA73714F5FABDB8A06B6B 98800~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. PRE-STCLR-0020 (SFN: 6860176) which carries W. St. Clair Street over a tributary to Seven Mile Creek in the City of Eaton. Bridge is listed on the National Register of Historic Places. Rehab work includes replacement of stringers, bearing plates, backwall plates, and pavers.~|~~|~CA515620432AFDE02995C2E6E81285D74FCB8C7C 103487~|~1~|~1~|~01/IMS~|~Existing IR 70/71 pavement reconstruction~|~04 - Reconstruction - No Added Capacity~|~801FB04E2305C020A75BA9516FBBC1916B9C1B38 103487~|~1~|~2~|~02/NHS~|~IR 70/71 widened pavement and work on Fulton St and Mound St~|~03 - Reconstruction - Added Capacity~|~838739C5AE0ABB62380904BC743492856EF52CF1 103487~|~1~|~3~|~03/IMS~|~Grant Ave bridge replacement~|~10 - Bridge Replacement~|~DACE72A0BD46C6D042ADB700CCFD6628EC36145A 103487~|~1~|~4~|~04/NHS~|~North abutment of future structure FRA-71-14.61P~|~08 - Bridge - New Construction~|~E4C5FEA2AE9840F97FF356E2E1267C7DAEE39B2E 103487~|~1~|~6~|~06/IMS/AEP~|~100% AEP items to be done as part of the project~|~43 - Utilities~|~87F795A8082545649C10DDEA9724AB1E42E567DE 103487~|~1~|~7~|~07/MPO/Cols~|~MORPC/City funded enhancement items~|~44 - Other~|~62D1CD5CB89D85512BA47E63D425224F96AE8DD2 103487~|~1~|~5~|~05/IMS~|~Project eligible utility items~|~43 - Utilities~|~7ABB4F4B13CF4D8409D9F4B9D7728EB4B0C8C8F0 103487~|~1~|~8~|~08/IMS/Cols~|~100% Columbus items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D3075B3A52502A6019E361D29AEFD2AE644A5B8A 103487~|~1~|~9~|~09/ENH/Cols~|~Incremental items - Columbus to pay the difference above standard items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9FACA7F9DAC7A739454E2450A5A3D33D37314689 103487~|~2~|~10~|~10/IMS~|~Bridge repair on several structures over IR 70 and IR 71~|~13 - Bridge Rehabilitation~|~27D9F314A0E99954936793CD1771A99458C0CCA2 103487~|~1~|~11~|~11/SAF~|~Repair attenuators and guardrail damaged by vehicle accidents~|~04 - Reconstruction - No Added Capacity~|~4791A2D707470B72CD67BC81A6C9A0ECE25C570A 126377~|~1~|~1~|~01/IMS~|~Bridge rehabilitation to include deck replacement, semi-integral abutment conversion, painting, approach slab replacement and substructure patching~|~13 - Bridge Rehabilitation~|~25CA836463139AB51F6CB212BEBA3A65A3926728 85032~|~1~|~1~|~01/BRF~|~0834076 BRO CR105 0.05 Intersect: E Fork Little Miami RiverNon Fed Aid. BR eligible. 80/20 split w/Brown Co. local match. 01/BRF/BR/BRO~|~10 - Bridge Replacement~|~093E62C46AFB98FFB35E7512852E659CFFB0271F 121455~|~1~|~1~|~01/S>2/NFRA~|~Resurfacing, urban paving in New Franklin.~|~05 - 4R Maintenance - Resurfacing~|~480190CE2E242F238453212ED0BD35BB76D1500E 121455~|~1~|~2~|~02/S>2/BAR~|~Resurfacing, urban paving in Barberton~|~05 - 4R Maintenance - Resurfacing~|~165E8782FDFEB0389CD45641371AEC43D562DA7E 121455~|~1~|~3~|~03/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~0A835994E7DEAE55A3FE9CB456186EF1569EA500 92516~|~1~|~1~|~01/ERD/CAMB~|~"01/ERD/BR/CAMB" City of Cambridge rehabilitation of Historic Armstrong Coverd Bridge utilizing Historic Bridge Funds with a project cap of $168,000.00~|~13 - Bridge Rehabilitation~|~0506FC729866A4C362E8C0DA7723888466459846 108711~|~1~|~1~|~01/S<2~|~Full reconstruction with cement subgrade stabilization of existing roadway. The work will include widening the roadway out to two 12? lanes with 8? paved shoulders. Additionally, underdrains will be installed to improve subgrade drainage and the existing ditches will be regraded to improve storm drainage.~|~03 - Reconstruction - Added Capacity~|~622ED98883F0FB123D99F7A8A54C74381DB041A8 108711~|~1~|~2~|~02/S<2~|~Lighting to be paid by the City.~|~~|~6B688A174F55DF72A5CF0A047E5685C35DCFBDBC 90570~|~1~|~1~|~01/NFP~|~This is a herbicidal spraying contract using maintenance operating funds.~|~04 - Reconstruction - No Added Capacity~|~371D0E3CBD162F51F37B38B353B99BCDADDAC526 120072~|~1~|~1~|~01/NFA~|~NEVI Round 2 76-B~|~63 - Electric Vehicles & Charging Infrastructure~|~B653F65946634B4E12EEDF7028552D7BB703CECE 116264~|~1~|~1~|~01/SAF~|~Left turn lanes on SR-125 at Sugartree Rd~|~21 - Safety~|~31DAEBDE335E53F5405DE58B579756D12AD0791B 126362~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~290CBD14B1A20691BB204C2D0CCE0DA3E0E8CD83 124353~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federal bridges on interstate system~|~13 - Bridge Rehabilitation~|~2AF53289C40C73A848570EF649D7EB1211507162 93523~|~1~|~1~|~01/NFP~|~100% 4MA7 funding for facility renovation~|~44 - Other~|~3AE0B03246E675B6CCA5073201810D7E8E85F7AC 104801~|~1~|~1~|~01/BRO~|~Plan split for bridge drainage repair~|~~|~5F5580906340B6F68566BDCDBF9499C6283A64B8 85605~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~24706420E8AA912261EF37F314C2140E43C851B5 109726~|~1~|~1~|~01/NHS~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~00997E8F4C6B51E438BE76E2B83E00E2201EEE58 109726~|~1~|~2~|~02/STR~|~Curb ramps on SR197 and South Street~|~28 - Facilities for Pedestrians & Bicycles~|~F7D01702D37C5BE20839C49D394D13DC4661585C 93040~|~1~|~3~|~03/STR~|~Plan Split 04/STR/BR/ - District Bridge Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP~|~13 - Bridge Rehabilitation~|~53BA64F801D9E827A1D611DDC05205B7C6B440A6 93040~|~1~|~4~|~04/S<2~|~Plan Split 05/S<2/BR/ - District Bridge Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP~|~13 - Bridge Rehabilitation~|~B294C9AC3B08B628227394D18C9945274D8A4312 93040~|~1~|~2~|~02/STR~|~District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-SR 37-19.68 to 28.20~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4F6240AFD7F54217DCFFE53500564AD98724FF0E 93040~|~1~|~1~|~01/S<2/LANC~|~District Preservation Urban Paving - See CAP Comment - Resurfacing with related work in the City of Lancaster on Fai-SR 37-19.13 to 19.68. Lancaster portion of costs to be paid via CRRSSA funds (C227/LA05)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~331621009E90D5BFE5FF382A99476712FA031528 109574~|~1~|~1~|~01/STR~|~Culvert ReplacementADA 247 13.22 & 21.18~|~04 - Reconstruction - No Added Capacity~|~95C4A6C86A59F978DF1AC1B6161139D013D0EE98 95644~|~1~|~1~|~01/MPO~|~To provide intermediate enhance reference location signs along the mainline of IR 70 from slm 16.39 to 26.97 and to provide ramp enhanced reference location signs at the interchanges at slms 16.60,18.17,20.00,20.37 to 21.65 and 26.63.~|~21 - Safety~|~485F211B4D6FB63014480DE3F7C331C9F57F8765 115445~|~1~|~1~|~01/S>2~|~This plan split includes all work needed to construct the project, which will add sidewalk according to the project description.~|~28 - Facilities for Pedestrians & Bicycles~|~9664536C83DDE9C19839383199D385692B7A720E 103358~|~1~|~1~|~01/S>2~|~Construction of cantilever style dynamic message signs in 4 interstate locations.~|~44 - Other~|~CC3CC289556C3C2C689F2EF05222B584CC69DFE4 89433~|~1~|~1~|~01/MPO~|~Upgrade the existing signal at Mitchell BLVD and Belmont Avenue.~|~21 - Safety~|~7F0E9896E454FCAD0EF5DA70F65162034356B99E 92105~|~1~|~1~|~01/NHS~|~Rehabilitation of the 4-Lane section of US 42 in Warren and Greene Counites. This work is primarily pavement rehabilitation. The existing pavement to be break & seat with a new asphalt overlay. This Planning Split is for the NHS portion of the project on WAR US 42 from SLM 17.94 to 19.88~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~495C050861A4C1E909F9F3CFCF0C94DE2D278797 92105~|~1~|~2~|~02/STR~|~Rehabilitation of the 4-Lane section of US 42 in Warren and Greene Counites. This work is primarily pavement rehabilitation. The existing pavement to be break & seat with a new asphalt overlay. This Planning Split is for the Rural portion of the project on WAR US 42 from SLM 19.88 to 24.74 and GRE US 42 from SLM 0.0 to 1.99 ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~99B0E0416C4EC95E966BA03BD03DDCC46067F7A1 110642~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~896D59CE93A7535DA4D23308DA417895D9A95F51 110642~|~1~|~2~|~02/NHS~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~FB468783D294F7A9104B2293B8E8BD5B116FADD4 94281~|~1~|~1~|~01/NFP~|~Construct a new ODOT garage on SR41 across from the current Adams County ODOT Garage. 01/NFA/OT/State~|~01 - New Construction~|~22A85021B405E82EA9B6C57320C99ED6ABA30D57 101765~|~1~|~2~|~02/S>2/REYN~|~Resurfacing inside of city of Reynoldsburg.~|~05 - 4R Maintenance - Resurfacing~|~292F9E6281584CF3F00B2B2257CA2F2031B17DC8 101765~|~1~|~1~|~01/S>2/PICK~|~Resurfacing inside of city of Pickerington.~|~05 - 4R Maintenance - Resurfacing~|~B5DBE770F65036700C5006AD907EA4EBFB58CBBB 92328~|~1~|~1~|~01/STR~|~Culvert replacement project. ATH 13 16.39, SFN 0500488 and ATH 78 4.70, SFN 0502731. Federal 80% and State 20%.~|~10 - Bridge Replacement~|~EE402DB77F36E6DC1B14A87F04338CAA42223355 115022~|~1~|~1~|~01/BRF/CORT~|~Bridge replacement.~|~10 - Bridge Replacement~|~93236DC9697535F56AC9AE61534B4DD937DF3621 118862~|~1~|~1~|~01/S5K~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~02E0485D44F93BD2301754A2770005D7B0E030EF 118862~|~1~|~2~|~02/STR~|~STP Rural Plan Split.~|~05 - 4R Maintenance - Resurfacing~|~E706816DD462FF634F21EACE56C6D3A07EF965BA 118862~|~1~|~3~|~03/S5K~|~city portion of roadwork plan split.~|~05 - 4R Maintenance - Resurfacing~|~D530AA11232641795CBEF662E01D1AB4390E4342 118862~|~1~|~4~|~04/S5K~|~added another plan split for 80/20 odot/local.~|~05 - 4R Maintenance - Resurfacing~|~7E234F7FAD18EA33CB6A34E95635FA48E682CFBA 97238~|~1~|~1~|~01/STR~|~BRO US 62 25.50~|~44 - Other~|~6D01F79B145C2657C2E17930C0C943C80FF18677 109026~|~1~|~1~|~01/STR~|~CRA SR 0096 03.88 & 04.18 Culvert Replacements~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B3561093C2E77F55CF6B2D93CB7E5B46158EB21 120441~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~99933AC39073621BF0127295D143700626177043 103075~|~1~|~1~|~01/S>2~|~Mill and resurfacing of STP route~|~05 - 4R Maintenance - Resurfacing~|~8F103E6365EB98015748185DC24B8420C60469A2 126340~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing/reconstruction.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~730E54E63834218DC1A76594BF70C42FD474C74A 93430~|~1~|~1~|~01/NHS~|~priority system preventive maintenance on JEF-22-0.00 to 3.86; includes resurfacing with asphalt, minimal repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~CDAF1B7ACC09C9B7EB83BA3882B0E03858FD1B23 94249~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~C347F1009FCB01FEF077D3120CD437A1C3A63E21 91999~|~1~|~1~|~01/STR~|~BRO US62 20.26-30.45 resurfacing projectOn US62, begin project 0.48 mile east of TR527 (Burbage Rd.) and terminate at the Highland Co. line. Brdg to pave thru:0801453 BRO US62 26.03 Intersect: West Fork Ohio Brush80/20 split~|~05 - 4R Maintenance - Resurfacing~|~892DFD41C81819D7E850D463740BE5AAF3F19A67 110996~|~1~|~1~|~01/SAF~|~Part 1, Safety Eligible: Traffic signal replacement including upgrades to backplates and signal coordination at US-22 and Walmart drive.~|~21 - Safety~|~CF2030BE9910E6C1278F9561526C52FB70911C47 110996~|~1~|~2~|~02/SAF~|~Part 1, 100% Local: Plan split for 100% local work including construction of the loon and extension of pedestrian facilities.~|~04 - Reconstruction - No Added Capacity~|~3C15368CE80E017C7534563EC02B1D76DBF84436 110996~|~2~|~6~|~06/SAF~|~Part 2, Safety Eligible Items: Upgrade existing signals, remove unwarranted signals, implement signal coordination, and upgrade school zone signing/flasher/markings along US 22.~|~21 - Safety~|~7D19F759E915A6C2BBD5CBFFC23C1291330F73FE 110996~|~2~|~4~|~04/S<2~|~Part 2, Urban Paving Eligible, Non-NHS: FY2020 Urban Paving for the City of Wilmington on US 22 within the City of Wilmington. The limits are 0.00 to 0.210 on CLI US 22D. This Plan split is for the items paid at 80% ODOT and 20% City on STP > 2 route, mainly consists of planing, new asphalt overlay and final striping.~|~05 - 4R Maintenance - Resurfacing~|~B08F2659701688ABEAD290F607E0612C9242DB9C 110996~|~2~|~3~|~03/S<2~|~Part 2: Urban Paving Eligible, NHS: FY2020 Urban Paving for the City of Wilmington on US 22 within the City of Wilmington. The limits are 10.00 to 12.57 on CLI US 22. This plan split is for the items paid at 80% ODOT and 20% City on the NHS portion, mainly consists of planning, new asphalt overlay and final striping.~|~05 - 4R Maintenance - Resurfacing~|~B727F267BA744141A4F076A2D01549695142BEDD 110996~|~2~|~5~|~05/S<2~|~Part 2, 100% Local Urban Paving Items. This plan split is for the items paid at 100% City, mainly consists of pavement repair, MOT striping, utility work, curb & gutter and curb ramps. The limits are 10.00 to 12.57 on CLI US 22 and 0.00 to 0.210 on CLI US 22D.~|~05 - 4R Maintenance - Resurfacing~|~957C566A67204005BE4D5232F28D912BC9DDBC17 110996~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~5238A432EC709AF6B5ED6796DD2D81A3162D7BAC 107638~|~1~|~1~|~01/STR~|~Replace ADA 247 3.50 (0103713)~|~10 - Bridge Replacement~|~02F704E076677CC8080F44FA09124FA435F0A662 98948~|~1~|~1~|~01/STR~|~Signal Work on SCI US 23 11.44~|~44 - Other~|~6CA2E52521A1C0A0B02E80AFE1F3B43E738E2B8A 88911~|~1~|~5~|~05/STR~|~Resurfacing of SUM-SR176 from SLM 3.84 to SLM 5.20 and SUM-SR303 from SLM 0.00 to SLM 0.90 and SLM 3.42 to SLM 5.49, in Richfield Township, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~041CA8B8A88AB0E915BDE5748D48149AB9D27BD2 88911~|~1~|~4~|~04/S>2~|~Resurfacing of SUM-SR176, from SLM 0.25 to SLM 1.05, SLM 1.13 to SLM 3.84 and SLM 5.20 to SLM 5.59 and SUM-SR303, from SLM 0.90 to SLM 3.42, in the Village of Richfield, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~2D49682B0E1D45F3461614CB708627F0B632D1D2 88911~|~1~|~2~|~02/BRO~|~Structure work on SFN# 7709862, SUM-SR-303-3.73 over Furnace Creek, in Richfield Township, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~55207FEC4B992776CB5CB953911AE07BF70F6EA4 88911~|~1~|~3~|~03/STR~|~Bridge work on SFN# 7709854, SUM-SR303-0.15 over Rocky River, Richfield Township, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~59200241A258C8E138D2FD7EF6EB240728575B42 88911~|~1~|~1~|~01/IMS~|~Bridge work on SFN 7707711, SUM-SR176-0.26 over SUM IR 77, in the Village of Richfield, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~7CA061325053E89D0DAA182E1812E6674EB33394 88911~|~2~|~6~|~06/S>2/RICH~|~100% Village Items - Curb, Gutter and replacing all Catch Basins along SR 21 within the Village of Richfield, Summit County, Ohio.~|~~|~FFFCA62DE6259DA1079373A8BA588C40F4A8FE6B 87943~|~1~|~1~|~01/IMS~|~4803272 LUC IR75 3.64 Intersect: Bancroft St~|~13 - Bridge Rehabilitation~|~CD8D098D5685639AD0CD6278684F8C2A7F00C387 77264~|~1~|~1~|~01/IMS~|~Reconstruct the Northern Kenmore Leg and West Leg interchange of IR-76 and IR-77 in the City of Akron, Summit County, Ohio. ~|~~|~7CB66407AD391D50FC8386E5FD793A3A93E1E849 92917~|~1~|~1~|~01/SAF~|~US-50: Approximately 0.25 miles east of Dry Run Road Widening of shoulder on south side to address obstructions and drop offs. Aquisition of 1 parcel or right of way on the south side of US-50 is required.~|~21 - Safety~|~CBC8617733BEDAE8D479D36A44BBD30BABDE6036 121888~|~1~|~1~|~01/ENH~|~All work included in this split. ~|~28 - Facilities for Pedestrians & Bicycles~|~C0E993163DBB640047BB61781EDBBDB83150D2CA 98621~|~1~|~1~|~01/IMS~|~Split for 100% state funding for project work.~|~44 - Other~|~112127ACD6682A50BF3C52300232C81D237C66D6 95145~|~1~|~1~|~01/NFP~|~100% State funded RPM replacement in D-05~|~21 - Safety~|~06EE78E2EF55855B2B468664BB768CB476FA4C89 126155~|~1~|~1~|~01/NHS~|~workplan.~|~05 - 4R Maintenance - Resurfacing~|~8DFF10ED4092FF4C677F7DBC1D0C2ACCEB6798C2 112701~|~1~|~1~|~01/IMS~|~Remove bridge at FRA-670-3.87A~|~13 - Bridge Rehabilitation~|~DAEB6FB94C96FB50AD6276CF63090E57C82E3F68 112701~|~1~|~2~|~02/STR~|~Bridge removal~|~~|~4EADD331CCCFA402C9C5679EAB3C9ADF59169FEC 112701~|~1~|~3~|~03/STR~|~Bridge removal SFN 8000697~|~40 - Special Bridge~|~8E13EACF9AE2FA2FBD74E6A4159399E4BB7E1860 103402~|~1~|~1~|~01/NFP~|~ODNR ProjectMicrosurface multiple routes in Shawnee State Forest.~|~05 - 4R Maintenance - Resurfacing~|~FC333061A56A5C05177DA771E8EC7797A134197B 122473~|~1~|~1~|~01/STR~|~All work included in this split.~|~66 - Resilience Improvement - Highway Project ~|~48D9F82D384C04D86AD90F4B416C8190C2AFDFA2 114479~|~1~|~1~|~01/NFP~|~Spot paving various locations in District 11~|~05 - 4R Maintenance - Resurfacing~|~CC9D4BE09AC4C042175E297B73DBB402176A1C07 123240~|~1~|~1~|~01/S5K~|~Program Project.~|~17 - Construction Engineering~|~396DC79FB9950E3C3BCB3A6F86B1D81AF9A995AB 87381~|~1~|~1~|~01/IMS~|~Remove and replace twin bridges with deficient decks and abutements with minimum of approach work on SFN 5502918 MIA 75 1415 L and SFN 5502942 MIA 75 1415 R (Branch of the Great Miami River.)~|~~|~A28680C07E9CBAE0C2C4AE7D9FDABF5C1A66BDC4 119343~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~4C2AF9B53901ABFE4C793A90DA12051278AC868C 123697~|~1~|~1~|~01/ERD~|~Intersection upgrade utilizing Federal Earmark funds at 80%.~|~21 - Safety~|~C268150C5707BE81C5DC30D8F42351DD09B68584 100057~|~1~|~1~|~01/BRO~|~Zone Paint Lower CordBridge on System Eligible~|~13 - Bridge Rehabilitation~|~0F81120EDA38E5A11736C2ADC6B37C92BD9B92CC 115549~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in POR, STA and SUM counties.~|~21 - Safety~|~AC24E870BB5DF7B7F69C0E96E581063B1C0CEC7D 96567~|~1~|~1~|~01/SAF~|~Traffic Signal @ SR94 / I271 Ramp~|~21 - Safety~|~F6F998AB8434D3B11F00A761B86426C938328167 103681~|~1~|~1~|~01/STR~|~Landslide repair on ATH CR 20 4.47-4.50. DSR ATH-006. 80% Federal ER funds and 20% Local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~524A154A8EFDD3960071D1B9762EC8575C03812B 103681~|~1~|~2~|~02/STR~|~Landslide repair on DSR ATH-007. ER funds are 80% and 20% local. ATH CR 20 5.27-5.29.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D60D05B0B633C1CA3B2D1FE86270DB8EC0CAFC7A 103681~|~1~|~3~|~03/S<2~|~Landslide repair on ATH CR 25 7.95, DSR ATH-008. Federal ER funds 80% and 20% Local.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C357B115C6DB331B8BDA9C651D175F32B7FECBD8 124488~|~1~|~1~|~01/IMS~|~Improvements to IR 71 to increase safety and reduce congestion~|~04 - Reconstruction - No Added Capacity~|~0D0E28B9B1E7124637DEBCE1D9A19CD688B77838 107835~|~1~|~1~|~01/STR~|~All work in this split. The bridge being replaced meets the state but not the federal definition of a bridge. Funds from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~12EFB3F7942EF7B676FB11D0FF9CDD811D9A6442 107390~|~1~|~1~|~01/NFP~|~Landscaping maintenance on various Interstate routes in Franklin County~|~44 - Other~|~0D2DF68DD02A4819BDDEE114B7F7A2AEA4D6C734 75530~|~1~|~1~|~01/NHS~|~Resurfacing on the National Highway System (NHS)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~32305B1ED74AEAE97937007D3A4EF09371099B9B 112680~|~1~|~1~|~01/NFP~|~Resurfacing of District-maintained service roads.~|~05 - 4R Maintenance - Resurfacing~|~5BF240FBCC7E9FDC8095DB4ECE578B7C19AD9A35 100769~|~1~|~1~|~01/NFP~|~RPM's on various routes throught District Six~|~44 - Other~|~47DCA58102B89E89FBFA3C89A2123D80B96E3CF6 107500~|~1~|~1~|~01/STR~|~Resurfacing HOL-62~|~05 - 4R Maintenance - Resurfacing~|~0D81909689136A94E982D7720CAB817EBC0431D6 100647~|~1~|~1~|~01/STR~|~Chip sealing of JEF-152 from Dillonvale NCL to Smithfield SCL and from SLM 8.85 to Richmond SCL. Chip sealing JEF-213 from TR 1128 to SR 7.~|~05 - 4R Maintenance - Resurfacing~|~F5A4B788227510C38B555CBB4E3CE310974B3424 100647~|~1~|~2~|~02/S<2~|~Chip sealing JEF-152 from US-22 to SLM 8.85.~|~05 - 4R Maintenance - Resurfacing~|~07DFFC517F5F7C4FF62F907D2549AFBD960B4791 106446~|~1~|~1~|~01/NFA~|~The Village will improve and widen by 4 feet approximately 1925 feet of CR 96 near the intersection of CR 20 in the Village of Carey, Ohio.~|~01 - New Construction~|~28155D1B7FFA6A7E9F6CAEEA7DA6D576A48007C0 101272~|~1~|~1~|~01/NHS~|~Resurfacing US 20 in Fulton County.~|~05 - 4R Maintenance - Resurfacing~|~818315D7ADDFB1B69C0D9BE9723F17AD96252712 101272~|~1~|~2~|~02/NHS~|~NHS bridge plan split~|~13 - Bridge Rehabilitation~|~0AC1C8F8B272A9BDAA32AFB82C1E4B82AA168DAD 97387~|~1~|~1~|~01/NHS~|~Bridge Rehab: SFN 3901505 (HUR-20-25.62)~|~13 - Bridge Rehabilitation~|~31D756F5C91290A7E964DD1286230382D508714A 114092~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~6E7A9F103073C97386C898FD56C5CFC0728E7139 122039~|~1~|~1~|~01/NFA~|~Created for ODOT TID fudning~|~44 - Other~|~7F1ACC5C322CC7D942E267B2E1F9E923B175C0E7 107990~|~1~|~1~|~01/S<2~|~Type A emergency landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2B36BB8B43D650663226E2C4468822AF88834FD9 96297~|~1~|~1~|~01/S<2~|~Bridge replacement SR 776 (SFN 4004264, SLM 10.87)~|~10 - Bridge Replacement~|~7535370CD0D470498F1A0E329811D296EC17614B 96297~|~1~|~2~|~02/STR~|~Bridge replacement SR 327 (SFN 4003306, SLM 0.77)~|~10 - Bridge Replacement~|~FF9924DB917A86E72E993D24CA34C346D3F97228 109270~|~1~|~1~|~01/NHS~|~Plan split for major rehab work~|~04 - Reconstruction - No Added Capacity~|~971CDD3AAA8747B0E1161086DC9F08C6A988A1A1 109270~|~1~|~2~|~02/NHS~|~Plan split for reimbursement from utility for damage to storm system during gas line relocation~|~43 - Utilities~|~8E3E4658F8C0521997F285139184E3663BA38045 105548~|~1~|~2~|~02/S<2~|~Marion urban area plan split MAR-95-11.36-13.10 MAR-423-11.37-12.08~|~05 - 4R Maintenance - Resurfacing~|~A2F1EDCD3E7E5191E5C69E4F4B63DB61F909B687 105548~|~1~|~1~|~01/STR~|~Rural plan split MAR-37-3.31-7.29 MAR-95-4.48-11.36 MAR-423-12.08-16.37~|~05 - 4R Maintenance - Resurfacing~|~4EF32C9054260042540FB1C53CE8AA7809B03276 101531~|~1~|~1~|~01/STR~|~DSR# TUS-007~|~04 - Reconstruction - No Added Capacity~|~EBFDEEE2C658912B966DF86775D1AD9A4157ECB6 102581~|~1~|~4~|~04/NHS~|~Work on the NHS. Work on SR 65 in Allen County from SR 115 at 11.24 to the Lutz Road at 11.71. District Preservation Program funds.~|~17 - Construction Engineering~|~18E7CADA84FCC0559B3E068E0D4A4014D9A25268 102581~|~1~|~1~|~01/NFA~|~Work on SR 634 in Putnam County which is a rural minor collector and not eligible to federal aid. On SR 634 in Putnam County from US 224 at 2.82 to SR 114 at 8.17 and from SR 114 at 8.33 to SR 613 at 13.44. State funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~24A7FE08089B8F6152907E8A4A70BC4224381486 102581~|~1~|~2~|~02/S<2~|~Work on SR 65 in Allen County from Lutz Road at 11.71 to the Lima Urbanized Area boundary at 13.91.Work on SR 81 in Allen County from the Lima Urbanized Area at 10.70 to Eastown Road at 13.47. Work on SR 15 in Defiance County from Defiance Urban area boundary at 10.62 to the concrete pavement at US 24 at 13.15. Work on SR 53 from the Corporation Limits on the City of Kenton at 1.41 to the Corporation limits of the City of Kenton at 1.54 and from the corporation limits of the City of Kenton at 1.92 which is at TR 114 to the Kenton Urban Area boundary at 2.50. Funds from the District Preservation Program budget.~|~17 - Construction Engineering~|~6A83F0759AF6EFAB1883311ED87A34BC93A7F2EC 102581~|~1~|~5~|~05/S<2/KENT~|~Work inside the City of Kenton. Work on SR 53 from E. Forest St./Patterson Ave. at SLM 1.34 in the City of Kenton to the corporation limits of the City of Kenton at 1.41 and from the corporation limits of the City of Kenton at 1.54 to the corporation limits of the City of Kenton at 1.92 which is at TR 114. 80% federal funds from the District Preservation program budget with a 20% match provided by the City of Kenton.~|~17 - Construction Engineering~|~191CB38A861022CAFEE07C2BED8905F260A8266A 102581~|~1~|~3~|~03/STR~|~Work on SR 65 from the Lima Urbanized Area boundary at 13.91 to the Putnam County line at 19.06. Work on SR 15 in Defiance County from the Williams County line at 0.00 to the Defiance Urban Area boundary at 10.62.Work on SR 81 in Allen County from the SR 66 overlap at 3.31 to the Lima Urbanized Area boundary at 10.70. Work on SR 53 in Hardin County from the Kenton Urban Area boundary at 2.50 to SR 37 at 12.39. On SR 66 in Paulding County on the SR 66/SR 613 overlap in the Village of Oakwood which is from 8.18 to 8.39. Work on SR 114 in Paulding County from the Indiana State line at 0.00 to US 127 at 12.05. Work on SR 613 in Paulding County from SR 637 at 17.59 to SR 66 at 22.59 and from SR 66 at 22.80 to the Putnam County line at 24.81. Work on SR 637 in Paulding County from the Van Wert County line at 0.00 to the south corporation limits of the Village of Grover Hill at 1.76 and from the north corporation limits of the Village of Grover Hill at 2.26 to SR 613 at 7.04. Work on SR199 from the NCL of Upper Sandusky at 7.35 to SR103 at 14.21. Work on SR 37 in Hardin County from the Hancock County line at 0.00 to the Wyandot County line at 2.36. Funds from the District Preservation Program budget.~|~17 - Construction Engineering~|~DC3BC3A2F2CD1CEAD4A471A575C84B1B2599FFFB 124975~|~1~|~1~|~01/MPO/MILT~|~Replace and install new sidewalks and pedestrian lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~66C6B58B6AC24EFCEC48F86547E8408A9AFFBC5A 104809~|~1~|~1~|~01/NHS~|~Add LED enhanced Signal Ahead signs with distance plaques to the WB approach to US-35 @ Valley/Trebein Rd and to the EB approach to US-35 @ Factory (total of 4); add supplemental nearside signal heads to all US-35 mainline approaches (total of 6)~|~21 - Safety~|~47E00B419B8CF4CB536D4A1472CBB1EAA49B9D45 80961~|~1~|~3~|~03/NFP~|~100% local funding split~|~03 - Reconstruction - Added Capacity~|~312B098BF640AB6CA8533203A4A5042DB61F73A8 80961~|~1~|~2~|~02/S>2~|~80/20 fed/local funding split for urban paving eligible work~|~05 - 4R Maintenance - Resurfacing~|~633474E607F6CBF55E3527D57753156CBCA21F29 80961~|~1~|~1~|~01/S>2~|~80/20 fed/local funding split for work using MPO STP funds~|~03 - Reconstruction - Added Capacity~|~8A3265F7F8EBAC08538BAE190E8B44C1B95AFC28 110966~|~1~|~1~|~01/S<2~|~Landslide repair project. MOE 536 1.70-1.74. Funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7947C33CE3EC326941DF67D4D1601FA95A226DB6 108676~|~1~|~1~|~01/NHS~|~Landslide repair project. MOE 7 7.55. NHS route funded 80 federal/20 state.~|~17 - Construction Engineering~|~5EB37F0BF26808652D2009F09931D5377A23275C 88775~|~1~|~1~|~01/BRO~|~Replace deteriorated bridge superstructure with minimal approach work on SFN 5703697 MOT SR 48 1320 over the Great Miami River.~|~13 - Bridge Rehabilitation~|~6D16AF0D5442D7848E15FB930FB8C01BBC125D04 91925~|~1~|~3~|~03/S<2~|~Urban - Guardrail ProjectCO CC Urban:SCI -SR -140 1.130 to 2.260 0.000 Lane MilesROS -US -50 19.060 to 19.930 1.740 Lane MilesSCI -SR -140 0.400 to 1.130 0.000 Lane Miles80/20 split03/S<2/OTH/State~|~44 - Other~|~4B355ECB8F30B4398F77EFE1C3D35152759FF23B 91925~|~1~|~5~|~05/SAF~|~Safety - Guardrail ProjectAll end assyblies are on each route liseted on the other 4 slplits.CO CC Safety: For the upgrade of all end assymblies.CO CC Rural: LAW -SR -775 8.820 to 9.250 0.860 safety funds only on end assy'sBRO -SR -125 20.040 to 22.540 5.000 safety funds only on end assy'sROS -SR -772 11.840 to 12.970 2.260 safety funds only on end assy'sSCI -SR -125 0.800 to 1.660 1.720 safety funds only on end assy'sADA -SR -125 1.580 to 4.670 6.180 safety funds only on end assy'sPIK -SR -104 5.460 to 6.160 1.400 safety funds only on end assy'sSCI -SR -73 20.460 to 22.900 4.880 safety funds only on end assy'sLAW -SR -93 3.100 to 5.970 5.740 all safety funds HIG -US -50 6.290 to 10.100 7.620 safety funds only on end assy'sLAW -SR -93 22.960 to 26.680 7.440 safety funds only on end assy'sBRO -US -68 31.060 to 31.070 0.020 all safety fundsSCI -US -52 14.940 to 15.190 0.500 safety funds only on end assy'sCO CC NHS:ROS -US -23 13.200 to 15.510 all safety fundsPIK -SR -32 13.860 to 15.810 all safety fundsBRO -SR -32 8.450 to 8.530 all safety fundsSCI -US -23 11.120 to 11.180 safety funds only on end assy'sSCI -US -52 31.420 to 31.890 safety funds only on end assy'sCO CC Urban:SCI -SR -140 1.130 to 2.260 safety funds only on end assy'sLAW -SR -7 3.580 to 6.110 all safety fundsROS -US -50 19.060 to 19.930 safety funds only on end assy'sSCI -SR -140 0.400 to 1.130 safety funds only on end assy's100% federal safety funds05/SAF/OT/State~|~44 - Other~|~69C06233D79BD6F95A8994EABEBAD6CF217644D9 91925~|~1~|~2~|~02/NHS~|~NHS - Guardrail Project. CO CC NHS:SCI -US -23 11.120 to 11.180 0.240 Lane MilesSCI -US -52 31.420 to 31.890 1.880 Lane Mile 80/20 split02/NHS/OTH/State~|~44 - Other~|~A304D1CC1A00ACCC64C125F5BD25B747A1A79B01 91925~|~1~|~1~|~01/STR~|~Rural - Guardrail Project. CO CC Rural: LAW -SR -775 8.820 to 9.250 0.860 Lane MilesBRO -SR -125 20.040 to 22.540 5.000 Lane MilesROS -SR -772 11.840 to 12.970 2.260 Lane MilesSCI -SR -125 0.800 to 1.660 1.720 Lane MilesADA -SR -125 1.580 to 4.670 6.180 Lane MilesPIK -SR -104 5.460 to 6.160 1.400 Lane MilesSCI -SR -73 20.460 to 22.900 4.880 Lane MilesHIG -US -50 6.290 to 10.100 7.620 Lane MilesLAW -SR -93 22.960 to 26.680 7.440 Lane Miles80%/20% split01/STR/OT/State~|~44 - Other~|~A4DA1706270A08FD6559B27ED074B3352C1FF39D 91925~|~1~|~4~|~04/NFP~|~NFA - Guardrail ProjectCO CC NFA:LAW -SR -775 9.530 to 13.290 7.520 Lane Miles 100% State04/NFA/OT/State~|~44 - Other~|~E37791D95A1B0C20BF4F36FA97A3F0822E0DD9E2 126018~|~1~|~1~|~01/STR~|~Replace deck, expansion joints, and bearing rehabilitation or reset as needed.~|~13 - Bridge Rehabilitation~|~436091DFEE3268C29F251D6A36A509CA04E03059 94192~|~1~|~2~|~02/S<2~|~Project includes rehabilitating bridge PRE-35-1541 over Bantas Fork by replacing the rigid overlay.~|~13 - Bridge Rehabilitation~|~01C4E05C61AB2FCCCCED421DDD4255C9FA67FB6D 94192~|~1~|~1~|~01/S<2~|~Project includes rehabilitating bridge PRE-35-1258 (SFN 6800246) over Rock Run by replacing the superstructure and abutment stems down of the top of footing.~|~13 - Bridge Rehabilitation~|~5AF160C248930B155052265BF0A60B92D2769AE6 94127~|~1~|~1~|~01/S<2~|~Resurfacing of STA US 62 from SLM 35.72 to 36.02.~|~05 - 4R Maintenance - Resurfacing~|~9F29AB23150FE02E3509F30C569A93CFB0718493 94127~|~1~|~2~|~02/S<2/ALLI~|~80/20 Resurfacing of STA-US 62 from 36.02 to 36.45 and 37.84 to 38.63, urban paving in the City of Alliance.~|~05 - 4R Maintenance - Resurfacing~|~7EB9E8690C46B2C4A5D472F76697ED732F1110E4 94127~|~2~|~5~|~05/MPO/ALLI~|~100% City of Alliance items sidewalks (part 2).~|~44 - Other~|~475855145C760A419B68602E7F36CF365F8DB66D 94127~|~1~|~3~|~03/S<2~|~Bridge Maintenance to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~614D9048007D19E88CD5D2A03D842F2DD5700907 94127~|~1~|~4~|~04/MPO/ALLI~|~100% City of Alliance items, curb and gutter, partial depth repairs, full depth repairs (part 1).~|~44 - Other~|~A5F1F5D6096B2DBE850D4570387BEB3EBBC23520 84135~|~1~|~1~|~01/IMS~|~Erosion/slide correction of Southbound Interstate 77 ramp at Copley Road, in the City of Akron, Summit County, Ohio.~|~~|~95453AF208BA2547D443B316B9637992F13FE849 112849~|~1~|~1~|~01/BRF~|~Bridge replacement > 20' span.~|~10 - Bridge Replacement~|~0ED182A7AEDF28B1FC73EE6D2FC5A4217528D4BA 95304~|~1~|~1~|~01/ENH~|~This project consists of installation of bike lanes on Valley Street (CR 525), Rita Street and Stanley Avenue (CR 601).~|~28 - Facilities for Pedestrians & Bicycles~|~07C8C2CB33687061486E3C8B7E124BB0CD9D5D83 104298~|~1~|~1~|~01/IMS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~C05F98BEC4F7618AD44383B1521D591601B3928E 94720~|~1~|~1~|~01/NFA~|~Construction of new bridge on Hadlock Road (TR-335) over Ashtabula River in Ashtabula County, Ohio.~|~08 - Bridge - New Construction~|~675DD53E3D22B0BF5BAFA5C49526C417A9545279 115876~|~1~|~1~|~01/NFP~|~Split for bridge work~|~10 - Bridge Replacement~|~4FDE35A3E838CADD8AB1A6987BB8FF27F0D38FE3 121496~|~1~|~1~|~01/NFP~|~Operations completed chip seal installation.~|~99 - State Preventative Maintenance~|~D6B467BCE00A70C2DBA8C685432176A74C130805 107509~|~1~|~1~|~01/STR~|~Resurfacing COL-45~|~05 - 4R Maintenance - Resurfacing~|~618690AF571121BCD20F48C01DFACBE83D2531A7 116550~|~1~|~1~|~01/MPO/SILV~|~Reconstruction of Plainfield Road, realignment of Plainfield & Montgomery intersection, realignment of the Montgomery Road and Alpine/Section Road intersection.~|~21 - Safety~|~B4332E18712B241F6256B4D394E677A31BEF8C48 116550~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded improvements by Greater Cincinnati Water Works.~|~43 - Utilities~|~3F545791FAE09EF58343073513712A5073AA2F1C 76256~|~1~|~2~|~02/NHS~|~Major New portion of Phase 8 project limits from 14.50 to 16.50, Glendale Milford to Kemper~|~03 - Reconstruction - Added Capacity~|~02E6417F82E8774B982AAE3BCA01327633464DB9 76256~|~1~|~1~|~01/IMS~|~Major Rehab portion of Phase 8 project limits from 14.50 to 16.50, Glendale Milford to Kemper.~|~04 - Reconstruction - No Added Capacity~|~FD389B5D3C9FF6DD8B329814E7D4BA756B12B45D 76256~|~1~|~3~|~03/IMS~|~In-Lieu Fee Mitigation - 4SW7 funds.~|~03 - Reconstruction - Added Capacity~|~7FF72DC3BF9948FA65E0AC31A42CD0D1F813B2AC 76256~|~1~|~4~|~04/IMS~|~Bridge reconstruction added capacity~|~10 - Bridge Replacement~|~8E4AD65B655E6969A051CE32FA5D5B70C2E9A14A 76256~|~1~|~5~|~05/IMS~|~Bridge reconstruction no added capacity~|~10 - Bridge Replacement~|~A9FF1A617684EA88D8622EC1B6BC8FAD66F41820 76256~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~1EC8C4F82F689954CDE48EDCD7AE58359EBB0074 117558~|~1~|~1~|~01/NFP~|~various guardrail locations.~|~21 - Safety~|~E6E807F2F22A838683E03E79974CDC47A58EEB26 98315~|~1~|~1~|~01/IMS~|~Districtwide fast dry pavement marking contract~|~44 - Other~|~0E77C4AEFC07E5C73253576AC79F3CD264C3F7AD 97441~|~1~|~1~|~01/SAF~|~Install left turn lane on CR 32 (Middle Ridge Roadf) at TR 39 (Oberlin Road), realign skewed intersection and improve sight distance.~|~21 - Safety~|~46B3EB1A6558EC9A3EEF8C71D6396142D5F4F720 124928~|~1~|~1~|~01/STR~|~linked roadway roundabout project.~|~21 - Safety~|~7EE9F47F60AEC3F7D180E96FF8124143E236BB71 98812~|~1~|~1~|~01/NHS~|~Providing 7100' of new sidwalks along North Broadway in conjunction with City's new curb adn gutter project and ODOT''s resurfacing project within the City of Greenville. SR 49 SLM 17.35 - 17.64~|~28 - Facilities for Pedestrians & Bicycles~|~818DCBFB26044C31CBC9EFC8423C21FA28685F75 98812~|~1~|~2~|~02/S<2~|~Providing 7100' of new sidewalks along North Broadway in conjunction with Ciry's new curb and gutter project and ODOT's resurfacing project within the City of Greenville. SR 118 SLM 0.56 - 1.85~|~28 - Facilities for Pedestrians & Bicycles~|~8337CB08EE07BF2CA480AE0ED14AF14581D81845 107043~|~1~|~1~|~01/NFP~|~Resurfacing West Newport Drive in Mill Creek Park.~|~05 - 4R Maintenance - Resurfacing~|~E9D7C03AB1636114271F3101780AACD6E0CC365B 111390~|~1~|~1~|~01/NFP~|~All work in the project~|~05 - 4R Maintenance - Resurfacing~|~435E84DEB83CEBEB72419EC3A4E35BEDA3645230 123541~|~1~|~1~|~01/IMS~|~All work associated with the resurfacing of IR 71~|~05 - 4R Maintenance - Resurfacing~|~5D839DB0E0A2A373E267D71B21A0BCA8A6AD8F47 123214~|~1~|~1~|~01/NHS~|~Resurfacing project using an asphalt overlay treatment. WAS 50 0.00-3.58. NHS route funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~93FE79651A7A3570F5462EF95E86BC64F2A122A2 123214~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. WAS 618 0.00-0.16. Urban other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~94FAD1A4E84C51D5055ED388372EACB4DB45A4B0 120258~|~1~|~1~|~01/NFA~|~Construct sidewalk, ADA curb ramps, and pedestrian crossings along Shewango Way (MR-3843) in the City of Madeira.~|~28 - Facilities for Pedestrians & Bicycles~|~18E1BAAD82E54E97BD8E2521106F48DE0F6B35A3 90973~|~2~|~4~|~04/IMS~|~Minor bridge work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~13BBCA1F8940F4FC9D26931137D1517EDBE41141 90973~|~1~|~1~|~01/IMS~|~Replacement of linked structures > 20' span.~|~10 - Bridge Replacement~|~D2AA27DAFB4FDC1D0111ACD76BE06542C2EC5C81 90973~|~1~|~2~|~02/IMS~|~Resurfacing STA IR 77 from 8.36 to 9.50.~|~05 - 4R Maintenance - Resurfacing~|~778470B6DEF1E0DDCD432E69E8065DF18763D636 90973~|~1~|~3~|~03/NHS~|~Replacing the linked structure > 20' span.~|~10 - Bridge Replacement~|~5A0E2E521579D687441DA52F2C81126CA374D9B9 90973~|~2~|~5~|~05/NHS~|~Minor bridge work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~C47463B08F83DC8CFB5B0FD4134A56B3F9F7D405 90973~|~1~|~6~|~06/IMS~|~Rehab of linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~1809F10309C3037C4992673C6B52AAC7114332B7 90973~|~1~|~7~|~07/NHS~|~Minor rehab work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~3549E0BE97236DB6BC82F6F59F32E01661B194C4 90973~|~1~|~8~|~08/NFP~|~Retroactive fuel price adjustment~|~44 - Other~|~8D135822A8BFDEA78B1ED338A2490CE64375D0F4 87698~|~1~|~2~|~02/S<2~|~LOR-511-21.14 to 22.50~|~05 - 4R Maintenance - Resurfacing~|~49605CBA9BABE7AB046FC0644A4091E1C222AB1E 87698~|~1~|~1~|~01/NHS~|~HUR US 20 & LOR US 20~|~05 - 4R Maintenance - Resurfacing~|~9C0265864C77B5618C624AB854DCCD095392DEFA 87698~|~1~|~3~|~03/STR~|~LOR SR 511 - 21.42 to 22.63~|~05 - 4R Maintenance - Resurfacing~|~CFA8491688761466A64606AB501BA99FC561FA74 87698~|~1~|~5~|~05/NHS~|~80/20 Fed/City - LOR-20-6.23 to 6.59 - City of Oberlin~|~05 - 4R Maintenance - Resurfacing~|~55C08ABD4584D0C0A15236B30C6C3B3F29AD2EB2 87698~|~1~|~7~|~07/NHS~|~80/20 Fed/City - HUR-20-16.26 to 16.84 - City of Norwalk~|~05 - 4R Maintenance - Resurfacing~|~2A8557EAC5BB7FE7E0C958325F934C4823420118 87698~|~1~|~4~|~04/NHS~|~Minor Bridge Work~|~47 - Bridge Preventive Maintenance~|~690E14C0F4C819296755DC888557BCECDCA1EAD4 87698~|~1~|~6~|~06/NHS~|~100% City - LOR-20-6.23 to 6.59 - City of Oberlin~|~05 - 4R Maintenance - Resurfacing~|~D3A60ADCB8C59980A9EC8A9D73CBD13A5943BD3B 87698~|~1~|~8~|~08/NHS~|~100% City - HUR-20-16.26 to 16.84 - City of Norwalk~|~05 - 4R Maintenance - Resurfacing~|~9CBB6CCB9DB84B7A9FC647B23979A44E5BF553C0 87698~|~1~|~9~|~09/NHS~|~Bridge work Hur 20 22.81 and 24.49 (under 20')~|~04 - Reconstruction - No Added Capacity~|~491E34B4B76CBB9BEBD1D13FCB67221C2E209C9E 108481~|~1~|~1~|~01/STR~|~OH18-01 ER Event. Landslide repair project. ATH 13 0.60, DSR ATH-013. Rural other federal aid funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5BBE0E255C2B60275A7FC4E71DA91DBAE17D6592 127102~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~27B636E52DD3A45A732F9DCE794055F3E3E31232 92983~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on Lic-SR 79-06.43 to 08.12~|~05 - 4R Maintenance - Resurfacing~|~782BE43F723860609C9A863E4379F26718E7D6E6 92983~|~1~|~1~|~01/NHS/HEAT~|~District Preservation Urban Paving 4PF7 (80% Federal) / 4BG7 (20% Local) - Two CAP's 4TA7 & 4PS7 (See CAP Comments) - Resurfacing with related work in the City of Heath on Lic-SR 79-08.12 to 11.43~|~05 - 4R Maintenance - Resurfacing~|~DE7805719F380577221ED2DEB90E83E966B5279C 102845~|~1~|~1~|~01/NFA~|~D09 Auxiliary Markings (A) FY2022~|~44 - Other~|~0BFBB90D62ACB198D5094C87E1E09AD5DEC0F74F 124377~|~1~|~1~|~01/STR/SOME~|~Culvert repair/rehabilitation.~|~13 - Bridge Rehabilitation~|~C51198862BE9C04FEB913C24660F50437F973021 119951~|~1~|~1~|~01/NHS~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~7828F8458AC0D4A3608306B0B3F7279CA5EB1B95 109679~|~1~|~1~|~01/STR~|~Resurfacing SR 800~|~05 - 4R Maintenance - Resurfacing~|~43C57ADC1C8820F6EE06A4FC50674E0BEC8FA015 111265~|~1~|~1~|~01/NFA~|~Resurfacing of Highlandtown Wildlife Facility parking lot in COL county~|~05 - 4R Maintenance - Resurfacing~|~68909838A619E8D9397A6D4E7DE79C76B512835F 76433~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Resurfacing on IR 70 from 00.00 to 06.51~|~05 - 4R Maintenance - Resurfacing~|~33C8BCF90981732DADACEF6EE05621E8B97E68F6 76433~|~1~|~2~|~02/IMS~|~"02/IMS/OT/ " - District Preservation Marking Pavements 4PF7 (90% Federal) / 4PS7(10% State) - No CAP - Striping after resurfacing on IR 70 from 00.00 to 06.51~|~21 - Safety~|~E6668CAD50821FA413CAD6CA91131F73ABB45109 99515~|~1~|~1~|~01/SAF~|~This plan split includes realigning SR-123 and all associated work.~|~~|~AA35C3C4C9B61F90C095475A7EFC4A29283498B7 96610~|~1~|~1~|~01/NHS~|~The project will primarily replace the existing reinforced concrete deck with a new reinforced concrete deck for Bridge TUS-36-1724T (SFN 7900384). The steel beams will be painted and the approach slabs will be replaced.~|~13 - Bridge Rehabilitation~|~D52805746C9A1D2A5C555E0CB947C256674731B2 98495~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~E6F72AAB461E55E62F95216AA7C080285E8C4FAD 125500~|~1~|~1~|~01/NFA~|~Lake Erie Parkway Connector Path~|~28 - Facilities for Pedestrians & Bicycles~|~D477F5EBDF6147577458AE374A4FD3DCC54964A8 110258~|~1~|~1~|~01/NFA~|~Landslide repair project. MOE 255 15.32. Funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2C142E430411CE7B7C6082A021B71E29F8E54FA7 112547~|~1~|~1~|~01/NHS~|~plan split for the resurfacing on GRE-4~|~05 - 4R Maintenance - Resurfacing~|~F187647466BB498FBFF3709EF847C649D546B6A7 107539~|~1~|~3~|~03/NHS~|~Resurfacing SR 39 between the SR 7 ramps in Wellsville~|~05 - 4R Maintenance - Resurfacing~|~A0A1F46114504F85B1359FC297BD92F68578B1AE 107539~|~1~|~1~|~01/STR~|~Resurfacing COL-45 from Wellsville to US 30~|~05 - 4R Maintenance - Resurfacing~|~CAC583195E96B642DC7C6A48E28869BACF86807A 107539~|~1~|~2~|~02/S<2~|~Resurfacing SR 39 from the Wellsville WCL to the SR 7 SB Ramps; SR 45 from SLM 0.36 to SLM 0.89~|~05 - 4R Maintenance - Resurfacing~|~5B1AB15EEA3C472CE9617A465FD52265053262C6 100245~|~1~|~1~|~01/MPO~|~Repair and resurface Mayfield Road using MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~E5E61347F33A93832B0A410F90202F1DB8CE31F5 119932~|~1~|~1~|~01/S5K~|~Replace Culvert at Grand Lake St. Mary's~|~04 - Reconstruction - No Added Capacity~|~3A0D88283EF364D7A05FCABD6203F11AC644CEA9 124325~|~1~|~1~|~01/STR~|~Slide repair utilizing Ohio & Shale and OPWC funding (State Only) up to the respective CAPs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3A2BFCF432FFE8AA2845F1CA705120BFE0047849 91517~|~1~|~1~|~01/BRO~|~Rehabilitate/Replace existing truss bridge (TUS-36-1205, SFN 7900333). In the preliminary phase a feasibility analysis will be performed to determine the most financially viable option for rehabilitating the structure or eplacing it. Based upon the study detailed plans will be developed for the preferred alternative.~|~13 - Bridge Rehabilitation~|~473F504C659EBFC0C68955BE22681E33887C7DD1 91517~|~1~|~2~|~02/NHS~|~On going services to be provided by Consultant for bridge TUS-36-1205 during Construction~|~17 - Construction Engineering~|~5113AB09527DB58765F9DC324ABD5E27673C3099 125733~|~1~|~1~|~01/NHS~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~66C3314CA6CD8DEB265D695B53E94CB1236C9ECA 103799~|~1~|~1~|~01/SAF~|~SRTS sidewalk - Wapakoneta~|~28 - Facilities for Pedestrians & Bicycles~|~303FED1D9F1EDF8580D34A3DC663E45EFE7214B1 112982~|~1~|~1~|~01/SAF~|~Replace median barrier on FRA-70 from Broad St (SLM 11.22) to Souder Ave. (SLM 12.80)~|~21 - Safety~|~625F9B839708A46147771CBE2FCA14F0210A6D2F 120544~|~1~|~1~|~01/NFA~|~Asphalt Overlay CR 5 at 0.00-3.55~|~05 - 4R Maintenance - Resurfacing~|~5C31B256A8EEF839334C3FBE776C5C49BCB88201 119348~|~1~|~1~|~01/S>2~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~187117E9BB09300C3756230DF59493EE66B010F1 119454~|~1~|~1~|~01/S>2/YOUN~|~Sidewalk and curb ramp replacements, ADA curb ramps, crosswalk striping and bicycle repair station installation.~|~28 - Facilities for Pedestrians & Bicycles~|~226F019E77DE27DDE0FBFC39EBF4DCCCBD3E9143 85341~|~1~|~1~|~01/ENH~|~BRO US52 12.30-12.62 Ripley St Scape TE ProjectOn US52, within the corp limits of the Village of Ripley, it is proposed to construct a Street Scape on Second Street (US52) beginning at Main St west to US62/68 intersection with US52.80/20 split w/local match by Ripley. 01/ENH/OT/Ripley~|~30 - Scenic or Historic Highway Programs~|~00EBA9444AAD9D00346400FDDE908E4D9D17B6D7 104582~|~1~|~1~|~01/MPO~|~Resurfacing of CR 17 in the City of Barberton.~|~05 - 4R Maintenance - Resurfacing~|~C407E16348D8CB0A0B2B9F5FE887D9BEBB1A3113 104582~|~1~|~2~|~02/SAE/BARB~|~Restriping and intersection improvement of Wooster/Hopocan in the City of Barberton, Summit County, Ohio.~|~21 - Safety~|~A51CDF8DA3CD91256068C74704ECF7A4BB21879D 87089~|~1~|~1~|~01/MPO~|~Widen Yankee Street from Austin Pike/Social Row to Winding Green Way from two to five lanes, bikepath maintenance on Yankee.~|~03 - Reconstruction - Added Capacity~|~4FE24C49D123E6EDD11F44D38F2C125E1A6AD774 87089~|~1~|~2~|~02/MPO~|~This plan split is for the ongoing services.~|~17 - Construction Engineering~|~60A3B16211D943BD72ABD4FD9C6BF34D8ADC55BC 117131~|~1~|~1~|~01/MPO/FAIR~|~Concrete pavement repair on Dayton-Yellow Springs Road from Skyhawk Court to Gateway Drive.~|~04 - Reconstruction - No Added Capacity~|~BA64BE03FF1FFB25CFD04CF088E078B6296E1149 102746~|~1~|~2~|~02/STR~|~plan split for the bridge overlay on GRE-42-2029~|~13 - Bridge Rehabilitation~|~FCAE418FEE5086B03565BF5D38F75947B81F7F00 102746~|~1~|~1~|~01/STR~|~This plan split is for the bridge replacement on GRE-42-0265~|~10 - Bridge Replacement~|~29475F78F6FFE072FDA086EC187FE11B1968E44C 105562~|~1~|~1~|~01/STR~|~Rural Plan Split: FAY-734-2.07-5.23 FAY-22-11.48-14.13 & 15.57-15.91~|~05 - 4R Maintenance - Resurfacing~|~9E98F32D566E942276C54A784B906CF823D46BCD 105562~|~1~|~2~|~02/NFA~|~Not on Federal Aid System Plan Split: FAY-753-5.24-5.52~|~05 - 4R Maintenance - Resurfacing~|~3DB20183F525048EC7373640091BB84481F27C48 123122~|~1~|~1~|~01/STR~|~Bridge Replacement Noble SR 821-15.84 (SFN: 61025734)~|~10 - Bridge Replacement~|~CBF4413DD8F16CB1A542E296A6DF7A781EF0DC17 108597~|~1~|~1~|~01/NFP~|~The CITY is reconstructing 4,400 feet of Carter Street, specifically from Cochran Road to Davis Industrial Parkway~|~01 - New Construction~|~205A834F8B4648E4A1B292BD0B40D2FED8CCA3D6 99702~|~1~|~1~|~01/NFP~|~Spot paving repairs on various routes in Portage, Stark, and Summit Counties.~|~05 - 4R Maintenance - Resurfacing~|~AE0A737F1F3EB9C0164BACB278C7C121EECA25E9 99702~|~1~|~2~|~02/S>2/TWIN~|~Resurfacing of SUM SR 82 between SLM 6.20 and SLM 7.18 in the City of Twinsburg, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~DF873400F0BBC861A2A9B48A6AD3D7DD51CAF043 124756~|~1~|~1~|~01/ENH~|~Reduce lanes on Center St and Church St from 3 to 2, install a 6' bike lane separated by a 4.5' elevated island, replace and widen sidewalks to 13', and incorporate 10' parallel parking lanes. Project includes pavement markings on Church St from Garden St to Sargent St and on Sargent St from Church St to Center St to differentiate lanes.~|~28 - Facilities for Pedestrians & Bicycles~|~42B53E53B541FDA32A3F8DD05FF5E0580E9D42F7 114477~|~1~|~1~|~01/NHS~|~Asphalt overlay of US 22~|~05 - 4R Maintenance - Resurfacing~|~3F2E8855A295097DFA592FE3ECDDABE2F820CFFE 104035~|~1~|~1~|~01/STR~|~Asphalt resurfacing project on ATH CR 33A 0.00-8.71. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~C31EC242E192FCEBFBCF70EE4B45DA9B1F887A15 104035~|~1~|~2~|~02/S<2~|~Asphalt resurfacing project on the Urban System. ATH CR 110 2.64-3.12 and CR 33 8.12-8.71. 80/20% Federal/Local.~|~05 - 4R Maintenance - Resurfacing~|~61DF217B3FAEEA47E07202D01ECEFE6B7544FB9E 93193~|~1~|~1~|~01/STR~|~General system paving of MAR-95: 0-4.50~|~05 - 4R Maintenance - Resurfacing~|~9B7FE95BD9CC1BA84EC898BEC0032BE1F93EB2A9 118435~|~1~|~1~|~01/NFA~|~Bridge Rehabilitation project - superstructure only - CEAO funded BFP (3 round)~|~13 - Bridge Rehabilitation~|~083B3DCF924DDB26401F857174112058D1C638C2 110875~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0374DF2B5BFC1D2D0F00C6E1FE3495DECB6BAE12 123510~|~1~|~1~|~01/NHS/GREE~|~Resurfacing, urban paving in the City of Green.~|~05 - 4R Maintenance - Resurfacing~|~4F0C7BDCEBAFEABCF206339494FCD6EFC26471BB 102294~|~1~|~1~|~01/NFP~|~Crack Sealing of various State routes~|~99 - State Preventative Maintenance~|~D594F5BB062EF8065BF21B2F32A4D9F7C9FA8332 103736~|~1~|~1~|~01/SAE~|~District wide guardrail project to replace Type A Anchor assemblies on the NHS system. 100% safety program funds, SAC 4HJ7, from the Central Office controlled safety program. This includes work on US 68 and SR 309 in Hardin County, on US 33 and US 224 in Van Wert County and SR 65 in Allen County.~|~21 - Safety~|~0CFF76685A294F161C7242817805EEA85D7DF035 103736~|~1~|~3~|~03/S<2~|~Repair or replace guardrail sections and/or posts as needed at locations on the Urban STP system. This includes the following locations. DEF-15-11.70, DEF-281-1.35 and WYA-199-6.93. Funding is from the District Preservation Program.~|~21 - Safety~|~0FAD8FE6B84F6AF796DEB967DFF1748B1198730A 103736~|~1~|~4~|~04/STR~|~Repair or replace guardrail sections and/or posts as needed at location on the Rural STP system. This includes all locations not covered in the other plan splits. Funding is from the District Preservation Program. Work on SR 15 in Defiance County except for 11.70, Work on SR 249 in Defiance County, all work in Paulding County. work on US 224 in Van Wert County at 12.02 and all work in Wyandot County except for WYA-199-6.93.~|~21 - Safety~|~A1957D3D546EE952EC458EF56F9286CF3896F245 103736~|~1~|~2~|~02/NHS~|~Repair or replace guardrail sections and/or posts as needed at locations on the NHS system not funded by the safety program. This includes all five locations on SR 15 in Hancock County and a location on US 30 in Van Wert County. Funding is from the District Preservation Program. Federal NHS funds. This split covers work at locations that don't replace Type A anchor assemblies.~|~21 - Safety~|~370EFC75FFE3A81F390AF92319958EBB7CB92FA2 89097~|~1~|~2~|~02/NHS~|~NHS funding to pave culvert inverts at:UNI-33-15.08~|~05 - 4R Maintenance - Resurfacing~|~571A9A7F1347A209B2A981DA38FBB525597D2FF4 89097~|~1~|~1~|~01/IMS~|~IM funding to pave culvert inverts at:FRA-71-11.37FRA-71-27.9FRA-270-54.60MAD-71-2.16MAD-71-11.56MAD-71-6.10~|~05 - 4R Maintenance - Resurfacing~|~5E4C13A16CED35B0C08C9CF4895C872066F0BD6A 89097~|~1~|~4~|~04/NFA~|~100% State funding to pave culvert inverts at:FAY-734-8.09~|~05 - 4R Maintenance - Resurfacing~|~6C364DE3D4C86C0404ABC653D78443DE359326BF 89097~|~1~|~3~|~03/STR~|~STP Rural funding to pave culvert inverts at:MAD-42-22.85MAD-56-14.90MAD-665-10.71MRW-529-3.21PIC-22-9.19~|~05 - 4R Maintenance - Resurfacing~|~D290D2EC9EB91C5D84B53CFDE125311524B3C98D 119006~|~1~|~1~|~01/BRF~|~Bridge replacement. All work included in this split.~|~10 - Bridge Replacement~|~35AC255DD2346F67F1A7FC349BD9FADAFB81487B 111327~|~1~|~1~|~01/S<2~|~Tree Cutting on LAW SR 7 0.66~|~44 - Other~|~D36C8031AB4E7491673CB52160B8366668858DBD 87400~|~1~|~1~|~01/STR~|~Repair deteriorated abutement to extend service life of structures with no approach work on SFN AUG 29 9.73 over Schmier Ditch, .03 mile North of SR 219 and SFN 5400694 MER 49 2.17 over 2 Mile Creek, 2.17 miles North of Dar County Line and MER 29 4.86 SFN 5400155 rebuild approximately 3 ft. of the deck edges, waterproof edges and overlap existing (old over new). Also reface the abutments using anodes and upper haunches to carch deck spalls. Patch wingwalls, seal asphalt joints (centerline and deck edge joints).~|~13 - Bridge Rehabilitation~|~1497A70F93342B58704E7A6807BAD0215594F2E3 119556~|~1~|~1~|~01/NFA~|~Install Bike Connector ~|~28 - Facilities for Pedestrians & Bicycles~|~D0B091E50326276333B7B520D886A03E6A67EF46 101014~|~1~|~1~|~01/STR~|~This plan split is for the rural routes on this project.~|~05 - 4R Maintenance - Resurfacing~|~DC894708E9997D8E4136B98EC20A6E1314A77040 101014~|~1~|~2~|~02/NFA~|~This plan split is for the Non-Federal route on this project.~|~05 - 4R Maintenance - Resurfacing~|~FDE0F28A5025FC27D61E55872915D33D7468C2CC 101014~|~1~|~3~|~03/S<2~|~This plan split is for the small urban portion of this project.~|~05 - 4R Maintenance - Resurfacing~|~71FA837285D4FAEE2CD91C07E323E2A79E065B25 124862~|~1~|~1~|~01/NFP~|~Spot paving on various routes in POR, STA and SUM counties.~|~05 - 4R Maintenance - Resurfacing~|~5F6392864011789185B579FE56BF3AC6116A0544 89313~|~1~|~1~|~01/NFA~|~"01/NFA/CV/ " - District Preservation Culvert Program 4PS7(100% State) - No CAP - Culvert lining at: Gue-SR 662-00.30;~|~04 - Reconstruction - No Added Capacity~|~AADB18D7E066F039192AFB4F52E4BC0010EA78D7 88824~|~1~|~1~|~01/STR~|~District Allocation~|~10 - Bridge Replacement~|~E4B8C8699D44E7311C7C2CDAFC59DE107448119E 120390~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~BFA1A49CB7626CE9F714A466B37688BCB5F92AB8 88591~|~1~|~1~|~01/IMS~|~SFNS 2509725 & 2509784 - FRA 270-11.03 over Scioto Darby Creek; AND SFNS 2509903 & 2509873 - FRA 270-11.80 over CSXRR~|~13 - Bridge Rehabilitation~|~88F8786BD098487BD6FF1E1468426F7633F625EB 99082~|~1~|~1~|~01/S>2~|~Apply herbicides along roadsides for weed control on 4 lane roads - MOT/CLA IR 70/75/675 - US 40/68 - SR 4~|~44 - Other~|~DB6B65A906C1FAD6AD6CFA4F368ACB548894AE14 120947~|~1~|~1~|~01/STR~|~All work included in this split. Could not choose improvement code in Ellis, should be 47 Bridge Preventive Maintenance~|~47 - Bridge Preventive Maintenance~|~CE670FBDA4F103B1365566C0A5CB0C11E97152C6 87613~|~1~|~3~|~03/NFA~|~100% local funding to work not eligible for federal funding and to cover cost of construction above the available federal-aid funding (OH393 and MPO STP).~|~28 - Facilities for Pedestrians & Bicycles~|~ADB72642FB8E00AD9866BCC486EF297BA93F480E 87613~|~1~|~2~|~02/MPO~|~80% federal w/a required 20% local funding for work that is eligible for MPO STP funds.~|~28 - Facilities for Pedestrians & Bicycles~|~C30388D14C08DF1F7ACAED2E7668B70CD9A9256A 87613~|~1~|~1~|~01/ERD~|~100% federal funding for sidewalk work that is eligible for federal earmark OH393.~|~28 - Facilities for Pedestrians & Bicycles~|~9F7CF00304A6B95597A48331D0C82284A2B0D668 94047~|~1~|~2~|~02/IMS~|~100% State funds for maintenance of raised pavement markers using district system preservation funds.~|~44 - Other~|~144F613B16CFED339E9763A35DFD845043B0C2DB 94047~|~1~|~1~|~01/IMS~|~100% State funds for the maintenance of pavement markings and striping using district striping allocation~|~44 - Other~|~D68858080BA545416D6503F2A5DC6EDF505BC5D2 98502~|~1~|~1~|~01/STR~|~Guardrail rehabilitation and replacement throughout District 11.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~00FEB41F8081166E16ED7EB4B0F8FBA4F9F747A8 120804~|~1~|~1~|~01/IMS~|~Interchange alternative improvement at I-75/I-275~|~08 - Bridge - New Construction~|~51DE2B9C20B47B1A4543D47B5BFCBF5CD02339F3 84826~|~1~|~2~|~02/NHS/SAND~|~100% City of Sandusky Items~|~05 - 4R Maintenance - Resurfacing~|~C4C3906BB5BBE474A2F19E7EC6EDB220CA1DE6F0 84826~|~1~|~1~|~01/NHS/SAND~|~Urban Paving 80/20 Fed/City~|~05 - 4R Maintenance - Resurfacing~|~EE765A510189B026AD2E6766A5766C1A727D8C30 109083~|~1~|~1~|~01/NFA~|~J&C funds.~|~03 - Reconstruction - Added Capacity~|~BDE56D5A7D1F48AE31E46E03989FEDE6E4279C83 109083~|~1~|~2~|~02/NFA~|~DSA 629 Roadwork Development funds~|~03 - Reconstruction - Added Capacity~|~095FFDED2BCEEFEE72A357DC45E99DA67727DA2A 109083~|~1~|~3~|~03/NFA~|~Montgomery County EDGE fund.~|~03 - Reconstruction - Added Capacity~|~D3016F113D4254D11EF62D3EEE229B60C29F6035 109083~|~1~|~4~|~04/NFA~|~City of Dayton Airport (DAY)~|~03 - Reconstruction - Added Capacity~|~F8160815122B65BB369C2B4EAE7A0512D9ECAF22 109083~|~1~|~5~|~05/NFA~|~Northpoint Development~|~03 - Reconstruction - Added Capacity~|~6256FF7BD9B49CA112B070A0A7417B174821B688 109083~|~1~|~6~|~06/NFA~|~MC TID~|~03 - Reconstruction - Added Capacity~|~98A39E4E563CFF01A6DA1FA4166CA9DA85DF21F6 127012~|~1~|~1~|~01/CMQ/NILE~|~Signal upgrades and replacements.~|~21 - Safety~|~2FFC8EA7791A8431C51A7DB492CE644BBD8CA98A 106902~|~1~|~1~|~01/STR~|~ADA 781 6.60 & 7.40 slide repair.~|~04 - Reconstruction - No Added Capacity~|~51327A8BAC5190FD81DDE6CE41414F3CC061FF7F 125818~|~1~|~1~|~01/IMS~|~Plan Split for minor rehab of interstate~|~05 - 4R Maintenance - Resurfacing~|~01C667916653D0AD802F1AC516EA67E0EBAE604C 110283~|~1~|~1~|~01/NFP~|~All work is in this split.~|~13 - Bridge Rehabilitation~|~29AC8EFF8393F62F277BAD2B73206408B670D62D 109601~|~1~|~1~|~01/SAF~|~Construct a roundabout at State Route 32 eastbound ramp and various intersection improvements at the westbound 32 ramp and nearby intersections in Mt. Orab.Governor`s 150 location.~|~21 - Safety~|~DA5B56185B983F527E707F230BC2FF258C000B1B 109601~|~1~|~2~|~02/NFA~|~Sterling Run portion of project. Split being covered by Village of Mt. Orab.~|~21 - Safety~|~5214A0C50C2383E6FCEF16E337A9654D257A7113 88898~|~1~|~1~|~01/STR~|~Bridge overlay, expansion joint and bearing replacement for structure CLI-68-0711, SFN 1400967.~|~~|~DE212043F5C10509B3D1BD5A02E992CB56684E98 88227~|~1~|~1~|~01/MPO~|~Widen to include a center turn lane and new curb and gutter, add 5' sidewalk and tree lawn on both sides of the project, minor utility work and construction of a new sotrm sewer on CR 25A from Looney Road to Indian Ridge Drive.~|~21 - Safety~|~80A6BC3575CE261D816BCF71838FAAE40EA7B76D 88227~|~1~|~2~|~02/MPO~|~For the landscaping that is associated with this project.~|~31 - Landscaping & Other Scenic Beautification~|~8C66E75E0C0A3B48355B0EB39E6A3F24D1A3FCE3 88709~|~1~|~1~|~01/NHS~|~Costs associated with small culverts BUT-129-2488, BUT-27-0519/0521, and BUT-27-1190.~|~04 - Reconstruction - No Added Capacity~|~97238F6E2A6E61BFCC6345F7D0DC77A82287936C 88709~|~1~|~2~|~02/STR~|~Pave invert of BUT-732-0248 (CMP arch).~|~04 - Reconstruction - No Added Capacity~|~2BDC66B89E8B5E28EEDE8DCD587B1927A5A61E06 88709~|~1~|~3~|~03/S<2~|~Pave invert of BUT-732-0730 (CMP Round pipe).~|~04 - Reconstruction - No Added Capacity~|~0A0EFF5976DB79E581F8322E4055446B26E2D55D 85874~|~1~|~1~|~01/MPO~|~Newtown Road to .10 east of berkshire Road/Goldengate Drive OKI Add turn lanes at Royalgreen Drive and Berkshire Road/Goldengate Drive, access management modifications, improve lighting, new sidewalk on northsideof project, signalization improvements if warranted at Bartels, Royalgreene Hunley Corbly and Berkshire/Goldengate involving interconnect and preemption and drainage improvements, landscaping, sidewalk and curb.~|~28 - Facilities for Pedestrians & Bicycles~|~4276693A0D1ABA563215AD4E03914DA42FC656CF 85874~|~2~|~2~|~02/ENH~|~Greater Cincinnati Water Work items in project~|~28 - Facilities for Pedestrians & Bicycles~|~B8A8F5E016DFAA17199CBE3D34159D5D1BA50C31 117152~|~1~|~1~|~01/SAF~|~Plan split for crosswalk improvements~|~21 - Safety~|~0E3CD18E459A4F1A7E25841BBF8598721D93FA3E 109637~|~1~|~1~|~01/SAF~|~Plan Split for the Safety funding~|~21 - Safety~|~8E005EC83D49FE6D303A47014DF8B7460D4C1970 81282~|~1~|~2~|~02/BRO~|~Replacement of sfn# 7632738 structure over the Middle Branch Nimishellen Creek.~|~10 - Bridge Replacement~|~3167042FCD73016D6642581AB1D1D8B777A097C1 81282~|~1~|~1~|~01/CMQ~|~CMAQ eligible items.~|~10 - Bridge Replacement~|~F4C9DFA5BF4905CECCDA0494D131EE542792F438 104591~|~1~|~1~|~01/MPO~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~47C8AF63735266BC9B046A46541A3E5AB478DE46 95087~|~1~|~2~|~02/S<2/HEBR~|~Village of Hebron - 4BG7 (100% Local) - Ongoing Consultant Services During Construction~|~~|~22ACE88C16EFBE6E906BDC619A994E51A6C7DA0D 95087~|~1~|~1~|~01/S<2/HEBR~|~LCAT's/Village of Hebron sidewalk addition project - 4TB7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Construction of new sidewalks in Village of Hebron.~|~28 - Facilities for Pedestrians & Bicycles~|~004C0FAEF4D6F1E8CA819D045C1FFE9C3FF81220 108086~|~1~|~1~|~01/STR~|~Plan split for construction engineering services.~|~17 - Construction Engineering~|~7524E3BF96FDDB2730E3D82AD551BAEE9C127C97 109530~|~1~|~1~|~01/NFP~|~Split for tree trimming/removal~|~99 - State Preventative Maintenance~|~7B33FA7794F8FD9DAF533F75B20CA2809E0A2844 111850~|~1~|~1~|~01/IMS~|~KYTC's Share of the painting project.~|~13 - Bridge Rehabilitation~|~CC490448B3533D19736EF97155016D709B350E2A 111850~|~1~|~2~|~02/BRO~|~OH's Share of the painting project.~|~13 - Bridge Rehabilitation~|~14E77B7F5466DFC23275D1C35EF368F211915EF7 87840~|~1~|~1~|~01/NFA~|~It is proposed to install new and upgrade existing guardrail on the following routes in Ross CountyROS-CR-235 CROSCR00235**C 0.000 to 5.670 ROS-CR-223 CROSCR00223**C 6.470 to 6.680 ROS-CR-235 CROSCR00235**C 5.880 to 9.710 ROS-CR-240 CROSCR00240**C 0.000 to 0.810 ROS-CR-241 CROSCR00241**C 0.000 to 2.380 100% federal 01/NFA/OT/Ross~|~21 - Safety~|~4FD9D303F3DA1143B14C30140DCDCA93C96E86D1 105419~|~1~|~1~|~01/IMS~|~Bridge repair on Interstate bridges.~|~13 - Bridge Rehabilitation~|~A29D82841BCD5665906C2DDB0777648E71021716 105419~|~1~|~2~|~02/STR~|~Bridge repair on rural route bridges.~|~13 - Bridge Rehabilitation~|~095DB5CF7F2E3FE6097525AA93A5AC5C87C0F3C2 105419~|~1~|~3~|~03/NHS~|~Bridge repair on NHS route bridges.~|~13 - Bridge Rehabilitation~|~9D749DC723A850DA6764A6949238E223C6471B76 105419~|~1~|~4~|~04/S<2~|~Bridge repair on small urban route bridges.~|~13 - Bridge Rehabilitation~|~B24656D2B5D3620BFAF89B9C90C8A162A27821D5 115661~|~1~|~1~|~01/NHS~|~Repair and rebuild pavement that has settled on SR 4~|~~|~83DE332832AFA8CE7832C6C5F634DAE5E91F68F1 108169~|~1~|~1~|~01/S<2~|~Landslide repair from event OH18-01.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~352BD3FFA10C24CC0E6394F30EBB29CBBDA46043 117426~|~1~|~1~|~01/NFA~|~TR 165 (Moriah Rd) superstructure only project~|~13 - Bridge Rehabilitation~|~F6E41A1518CEB63086631EDACD8E0CC24740A07B 99947~|~1~|~1~|~01/STR~|~HOL-557-2.53 Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~D87F954D05AB1135B92CCA33A258C8187EBCA0E0 99947~|~1~|~2~|~02/NFA~|~HOL-643-0.42 & HOL-643-3.56 Culvert Replacement.~|~04 - Reconstruction - No Added Capacity~|~18619B9FB2ADF37EC9F56367B6B39730D7CAA5E0 121402~|~1~|~1~|~01/IMS~|~Resurfacing on FRA IR 70~|~05 - 4R Maintenance - Resurfacing~|~4B6E2492A91A80A19783E9AF3E4B2FEE89462D27 121402~|~1~|~2~|~02/NHS~|~Resurfacing FRA US 62~|~05 - 4R Maintenance - Resurfacing~|~4CAA391160D49A9F361D563411EA6E4CE08DDFCD 92891~|~1~|~2~|~02/NHS~|~100% City of Willard~|~05 - 4R Maintenance - Resurfacing~|~B2D20E7061AA6106D091550B5822EA1BEC9E7C99 92891~|~1~|~1~|~01/NHS~|~Urban paving - 80/20 - District Allocation/City of Willard~|~05 - 4R Maintenance - Resurfacing~|~CCE3DD938D097F5C1A55E3DF9C81053F52AF4129 92891~|~1~|~3~|~03/NHS~|~NHS Pavement outside of Willard Corp Limit (slm 4.60-4.95 RT)~|~05 - 4R Maintenance - Resurfacing~|~A29D868C330FC8308D5EBE8A3D5591C2E17E9214 106165~|~1~|~1~|~01/NHS~|~Plan Split~|~13 - Bridge Rehabilitation~|~CFBE7DB182690EF7423EA7247B8387F35CB39217 110611~|~1~|~1~|~01/NHS~|~Split for paving on the NHS~|~05 - 4R Maintenance - Resurfacing~|~7910C4CD3F0E75C27B94A1E73B6AEF873ACA4C78 110611~|~1~|~2~|~02/NFP~|~Split 2 for 100% local funded items of work. ~|~05 - 4R Maintenance - Resurfacing~|~2F43AD15CAA5A1A04121709146F327656FEC3D1B 110611~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~D01F337EE07FE39BDB92014E23BE312E40FA1992 99536~|~1~|~1~|~01/STR~|~STP Rural Culverts: ME-42-11.60, MED-42-12.70~|~04 - Reconstruction - No Added Capacity~|~167437E83021ECC5A698A29EE06D758A5CFC8108 114198~|~1~|~1~|~01/STR~|~Bridge replacement project MEG 681 21.81 (SFN 5303667).~|~10 - Bridge Replacement~|~D811855F84B63041DA4FBA6266F1FB3D2717E060 113170~|~1~|~1~|~01/NHS/HEAT~|~Emergency Funds - 4BY7 (Federal 100%) - No CAP -Emergency replacement of Culvert 1874734 that was washed out by heavy rains on 03/20/2020~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BCFFA86E2E0BA54518BDF69A210E6DACBEBC9E4A 120287~|~1~|~1~|~01/MPO~|~Federally eligible items.~|~04 - Reconstruction - No Added Capacity~|~AA0F26BBD6B2FDB42E2D366EB49D08DFF367CA3A 100862~|~1~|~2~|~02/IMS~|~Bridge rehab on Interstate bridges.~|~47 - Bridge Preventive Maintenance~|~091669BB45708C4BB24F7959F5B12A8AFE8A56B4 100862~|~1~|~1~|~01/IMS~|~PAvement repairs:MOT IR 75 SLM 7.53 to 11.09~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~199711887EDA95FF5F5C168A54D933B909C090A7 80468~|~1~|~1~|~01/NHS~|~Eliminate at-grade intersections at Factory Road/Shakertown Road and Valley Road by constructing new interchanges.~|~04 - Reconstruction - No Added Capacity~|~0946CA1F638F2C2E37F88C5E265E83E8884187A7 121975~|~1~|~1~|~01/SAF~|~Plan split for all work associated with roundabout~|~21 - Safety~|~ADF1607B8E798C709A546B74C1FE864F6E28885F 121975~|~1~|~2~|~02/STR~|~Plan split for locally funded scope, including water and sewer extension, and sidewalk and curb/gutter extension~|~04 - Reconstruction - No Added Capacity~|~A64F5B0EE7AAFAC5524A3EC40F1A9CB960A8D6A0 113407~|~1~|~1~|~01/NFP~|~Split for slide repair work.~|~44 - Other~|~5401967578564A4443B6400EF66FB61E1957AA3B 116614~|~1~|~1~|~01/NFA~|~Construction Inspection.~|~17 - Construction Engineering~|~84A0DF266505B1024E79D2CB13E08B6B6143B4FC 79851~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D3A750DCBFA4BA611181582C9CB0C426DD65D592 116551~|~1~|~1~|~01/MPO/ANDS~|~New sidewalk along Clough Pike and construction of a pedestrian refuge island with HAWK signal at mid-block crossing.~|~28 - Facilities for Pedestrians & Bicycles~|~3955FFD47F4222BBB7E0FE41875CF146C8BAAEE9 115767~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of MUS SR 345 00.20 (SFN 6005705)~|~13 - Bridge Rehabilitation~|~A5C23F80C4183D474F8403C868F057ACC24DDFDD 77261~|~1~|~1~|~01/IMS~|~Reconstruct SR-46 and SR-11 interchanges with IR-80 to improve weave areas, in Austintwon Township, Mahoning County, Ohio. ~|~~|~4DBCE7CA68932E6B68E18F5565D8AA41005DA05C 93857~|~1~|~1~|~01/NFP~|~ODNR parks 100% state~|~44 - Other~|~586122EC42BC768DDF495C02EAA35903532E240A 123262~|~1~|~1~|~01/SAF/TUS~|~Guardrail upgrade/replacement on various county routes with 100% (4HB7) CEAO Safety funding.~|~21 - Safety~|~1541471709A51104EA917C48F734447DBA90D94C 98493~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~31E11B602A713F91898E74CE4A86D4A92539DDD0 121483~|~1~|~1~|~01/S>2~|~STP>200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~827919D81ABA1B6CD2ABA276C701E4DFC48BB8D9 121483~|~1~|~2~|~02/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E564B3CA2B3C6B32732ADC32720D2538B11E58EE 96270~|~1~|~1~|~01/S<2~|~Replace concrete arch structure over Hargus Creek~|~10 - Bridge Replacement~|~4EEF26524A0BE7920757A23A090A00E8376DC6BA 101396~|~1~|~1~|~01/STR~|~DSR# BEL-006~|~04 - Reconstruction - No Added Capacity~|~BC748B971D24F8378D800C3B332273E51657F646 121686~|~1~|~1~|~01/NFP~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~7A7F45E49908639362544FE8C2179AF88BD543C6 121686~|~1~|~2~|~02/STR~|~Rural major collector~|~05 - 4R Maintenance - Resurfacing~|~2EA202249423D091E6D57D9A5FAE6BFF6A510C0F 101368~|~1~|~1~|~01/IMS~|~Clean expansion joints, beam seats and drainage systems for numerous priority route bridges in Hamilton County.~|~~|~32D3055AB0346FC4FEAB1DEBE3024A482FEA2526 101368~|~1~|~2~|~02/NHS~|~Bridge cleaning on NHS route bridges.~|~~|~6D7EEB8D41BCFE1E7919937639272302D3EB5233 101368~|~1~|~3~|~03/S>2~|~Bridge cleaning on Large Urban route bridge.~|~~|~A8348638D1FF0BFD0D40D76BA08BAB330FC33321 120697~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 37/Pleasantville Road.~|~21 - Safety~|~8CD3652875C7ABBB7ABEE1E3BC59DA9E7D0B871C 112602~|~1~|~1~|~01/NFP~|~Improvements to SR-315 North exit ramp to Goodale St, approx 500 feet for new turn lanes at intersection~|~44 - Other~|~5179EBE0A1444FCE106111530C15237E458DDC61 111615~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FRA-16-5.35-6.40~|~05 - 4R Maintenance - Resurfacing~|~F807AAE25984CC4E9AFCFDD2B412CE85AD25213D 115299~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~D463295713805BD0435693FCA7534F44C37DB4A7 105080~|~1~|~1~|~01/NFP~|~Systematic sign replacement.~|~21 - Safety~|~9F48A7EC565B19341FC1979D155521263AABB656 111317~|~1~|~1~|~01/SAE~|~Pavement Marking on various routes in Adams County.~|~21 - Safety~|~0B4D4D60880FDA7C69B2F1B455A1918558F943EC 115395~|~1~|~1~|~01/STR~|~Resurfacing project. Rural other federal aid funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~181F2AD04DB17908966F050AE028AEF716AA4E5D 115395~|~1~|~2~|~02/NFA~|~Resurfacing project. Not on the federal aid system. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~E212B0E91A2E70C04341F6D01DB802EBCC0876EC 97641~|~1~|~1~|~01/BRF~|~SFN 8758883~|~10 - Bridge Replacement~|~74F1C54B57AFE9E1FD58F3F530FF3691697DD6F4 97641~|~2~|~2~|~02/BRF~|~SFN 8736375~|~10 - Bridge Replacement~|~9B895E9B2376A986C4EFAC0E4B1B0FD5E321A886 97641~|~3~|~3~|~03/BRF~|~SFN 8736448~|~10 - Bridge Replacement~|~DF2B18EBA72E34E7D4F8110ABE1814FBC9DD960A 95282~|~1~|~2~|~02/S<2~|~Plan split for Greater Cincinnati Water Works improvements (100% local) being constructed with this project.~|~43 - Utilities~|~848033388E5D5EEB07E6E1C1F1B2AC476F6C60A1 95282~|~1~|~1~|~01/S<2~|~Rehabilitation of existing Cheviot Road from SLM 0.00 to 0.64, repair of curb, storm water inlets, and sidewalk. Widening for an additional northbound through lane from Tallahassee Drive to Jessup Road, and profile and alignment adjustments to a sweeping curve south of Jessup Road.~|~21 - Safety~|~D46F681CEA0C5D1646726F2A1168C4BE41C83E7D 126800~|~1~|~1~|~01/STR~|~Plan split for all work on SR-295~|~04 - Reconstruction - No Added Capacity~|~F0AA466E96303D2BAB88A9395A05AA7707879E98 111569~|~1~|~1~|~01/NFP~|~Created plan split for TID funding~|~44 - Other~|~4C8DD147324874D79A29E6A081CE1BFA597CB5C4 124831~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection to a single-lane roundabout~|~21 - Safety~|~AB12D36867009B1F35E079511BDE8C3599B5614B 91049~|~1~|~1~|~01/STR/GEA~|~80/20 funding split for all work using federal county STP funds.~|~05 - 4R Maintenance - Resurfacing~|~A1EC692FD34CD46AD2697B1122C0F7DF678EA9AF 97812~|~1~|~1~|~01/MPO~|~Install new Signal on County Route~|~21 - Safety~|~EDD198F44F5D706F0CF2F5A30176AC7394BC9283 97266~|~1~|~1~|~01/NHS~|~Rounadabout~|~04 - Reconstruction - No Added Capacity~|~5EFAB1D726BB326EBB6672545A47393C6E326C5F 95497~|~1~|~1~|~01/S5K~|~District Preservation Paving Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on General System Segments~|~05 - 4R Maintenance - Resurfacing~|~C3683496EDAFE72BDA1AC4D75D499366F2AAFBC0 95497~|~1~|~3~|~03/S5K/ZANE~|~City of Zanesville - 4TA7 (80% Federal) /4BG7 (20% Local) - See CAP Comments - ADA Ramps and other items requested by the City of Zanesville~|~05 - 4R Maintenance - Resurfacing~|~AC9C7165C9DFB23561510B7A93A4EE451E30D5D4 95497~|~1~|~4~|~04/SAE~|~City of Zanesville Safety Award- - 4HJ7 (100% Federal) - see CAP Comments - - construction of safety related appurtenances (striping, supplemental signal heads, access management devices, signing) along Maple Avenue~|~21 - Safety~|~9E838B468D86AF59A2483E13BD5F4E7BAB6122E6 95497~|~1~|~2~|~02/S5K/ZANE~|~District Preservation Urban Paving - 4PF7 (80% Federal) //4BG7 (20% Local) - See CAP Comments - Resurfacing in the City of Zanesville with related work on Urpan Paving Segments of SR 60.~|~05 - 4R Maintenance - Resurfacing~|~DF7C708ED5D504A4A65A090DA08F864F361A8E45 91450~|~1~|~2~|~02/STR~|~Deck replacement project on GAL 775 0925 (SFN 2704684). Work also includes steel beam repair and bridge painting. Rural other federal aid funded 80 federal/20 state.~|~44 - Other~|~8E694DA0929EF6BC53B7C6EAE5894362A171E4DE 91450~|~1~|~1~|~01/BRF~|~Deck replacement project on GAL 775 0335 (SFN 2704501). Work also includes steel beam repair and bridge painting. Funded 100% bond and 80 federal/20 state.~|~44 - Other~|~0C5CF09F12D5FD64B42AA558E0EBA50E3B492CFE 112604~|~1~|~1~|~01/ENH/LOWE~|~Improve and rehabilitate Stavich Trail and redeck a bridge in the Village of Lowellville.~|~28 - Facilities for Pedestrians & Bicycles~|~33E79772250AB33217D7FAC6EBA825FCEEB313C6 110694~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~1051E2721E7CD5AA784D91B91C9A7C5B2358C1D3 110694~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~AE1F3B66F9456206F5479B765C44F40690799EDC 110694~|~1~|~3~|~03/S>2~|~Balance FY2026-1~|~17 - Construction Engineering~|~801F0E2EB24905FE7CED9EBFC17D329044A73AEB 115864~|~1~|~1~|~01/SAE~|~pavement markings on Huron County roads.~|~21 - Safety~|~1311025AD128B895369CB87638E4442D959C768E 111546~|~1~|~1~|~01/MPO~|~TMACOG CMAQ Funded items~|~05 - 4R Maintenance - Resurfacing~|~2C837954886A861CC4A03E713731F18D4558CCB0 98860~|~1~|~1~|~01/S<2~|~Construct a three-legged roundabout at N. Bechtle Avenue and St. Paris connector.~|~~|~B9DE1BC67714689575086BF3AA8138E57E6CB40D 96512~|~1~|~1~|~01/NFP~|~Pavement repairs on ATB-SR46, MAH-IR80, and STA-IR77.~|~21 - Safety~|~BF6F94A8B1FC2E0B6B2D16CCA0F9E211D0D3B102 111043~|~1~|~2~|~02/S>2/CAWD~|~Relocation of waterline.~|~21 - Safety~|~8224028EB827FA8CF1CEC9E8457CA1838200DCCE 111043~|~1~|~1~|~01/MPO/STCE~|~Adding TWLTL on Perry Street between Southway St and SR 172 and includes installing sidewalks and decorative light poles.~|~21 - Safety~|~6DE1B15719C3208F1C2189025DB00A4895C51430 91310~|~1~|~1~|~01/NHS/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the NHS portion: on US 42 On US 42-Reading Road from the Norwood Lateral to Seymour: from SLM 6.99 to SLM 8.25. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~0EE06D2551471A967765884ACCB83B214A2BB6DB 91310~|~1~|~2~|~02/NHS/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the NHS portion: on US 42 On US 42-Reading Road from the Norwood Lateral to Seymour: from SLM 6.99 to SLM 8.25. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~1CF1F3EF69D4102099F49F43DB898B9959E516ED 91310~|~1~|~4~|~04/S>2/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the Urban roadway portion: on SR 561 from Beechmont (SR32) to Observatory Ave.: from SLM 0.00 to SLM 1.83. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~5A54CF9F883C8CF77048640E418A71BE6036FF97 91310~|~1~|~3~|~03/S>2/CIN~|~FY2015 Urban Paving project in the City of Cincinnati. This Plan Split is for the Urban roadway portion: on SR 561 from Beechmont (SR32) to Observatory Ave.: from SLM 0.00 to SLM 1.83. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~8A847F1760BC5C046A34B774E461B979270538CD 88703~|~1~|~2~|~02/MPO~|~100% Local items.~|~04 - Reconstruction - No Added Capacity~|~489CDE88E7D84D0A383065F1F0E16D7632FE817C 88703~|~1~|~1~|~01/MPO~|~Resurfacing and widening~|~04 - Reconstruction - No Added Capacity~|~65E714A17383B84483CA4A9418421BDEE939C635 91344~|~1~|~1~|~01/S<2~|~General system resurfacing of PIC-752 within Ashville S Bloomfield urban area. SLM 1.82-2.32~|~05 - 4R Maintenance - Resurfacing~|~57DA477B09C506E48DB2A640682E559E034E5762 91344~|~1~|~2~|~02/STR~|~General system resurfacing of SR-752 in rural area. SLM 2.32-8.43~|~05 - 4R Maintenance - Resurfacing~|~6D48ED3B6ECEE24E2973F6E9BB6E511CB258CD2E 110834~|~1~|~1~|~01/SAE~|~Safety funding split~|~28 - Facilities for Pedestrians & Bicycles~|~8BCA38F0E879B4AC588FFA40BCADE37EA76FCEDE 118614~|~1~|~1~|~01/NHS~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~3B2977B6447096F26E118DDFF067E35C1460E102 93505~|~1~|~1~|~01/MPO~|~Plane, pave, replace guardrail and apply pavement markings on MED CR 17 (West 130th) from 0.00 to 5.59.~|~05 - 4R Maintenance - Resurfacing~|~1AADBE7761EC4021C42DA91087FFDE68892780B0 93505~|~1~|~2~|~02/MPO~|~100% local items.~|~05 - 4R Maintenance - Resurfacing~|~A3D5E5AAF86950B691AF756C2A4B0F1F75020A4F 109316~|~1~|~1~|~01/STR~|~CEAO funded bridge rehab of McLean Mill Rd over Big Darby Creek~|~10 - Bridge Replacement~|~6071A10E410E6D7520456B9F0A30EA7E26A2EC1B 87689~|~1~|~1~|~01/NHS~|~Preventive Maintenance - District Allocation - 80/20~|~47 - Bridge Preventive Maintenance~|~46615D709D007782FCD27B641E0288296AF4D067 118787~|~1~|~1~|~01/NHS~|~Fine Grade Polymer Modified Asphalt Concrete Overlay (Smoothseal)~|~~|~3EFF25AF9A4A272E3B1E40DF50248CA9A323B384 108704~|~1~|~1~|~01/SAF~|~Signal replacements using 95% Small City funds (4B97) and 5% Local funds (LNTP).~|~21 - Safety~|~A0BEB1F7EEE49A9D35A61466ECD19B54031CDC89 109006~|~1~|~1~|~01/ENH~|~Construct sidewalks, curb and curb ramps 95% TAP funding.~|~28 - Facilities for Pedestrians & Bicycles~|~E0F84200AD313BD0C544736CD8B01928991A6D51 99660~|~1~|~1~|~01/NFP~|~SFNs 4805909, 4805917, 6201628~|~47 - Bridge Preventive Maintenance~|~4ECFAB87A376B88D35B8B8DE269B73E775EA8060 96687~|~1~|~1~|~01/NHS~|~Plan split for all pavement in the project between SLM 11.30 - 15.59 on HAM-126. This will include all mainline and ramp work.~|~~|~7DF3863FD6C711715948D349088E514BB745EA1F 120724~|~1~|~1~|~01/BRO~|~Plan Split 01/BROS~|~10 - Bridge Replacement~|~E1C50E8F4CC7F4FA8C238B4C27730AD133CDDC2D 116675~|~1~|~1~|~01/STR~|~All work is in this split~|~05 - 4R Maintenance - Resurfacing~|~1400BAC7C28F3D389F11867A955E4FFDBD6FD4F3 89469~|~1~|~1~|~01/BRF~|~"01/BRF/BR/JEF" - Bridge replacement on CR 1 5.58 at existing line and grade. Project is 2.0 mi S of SR 150.~|~10 - Bridge Replacement~|~4B32D04DCEFA654C66921957E5D75461CDE7252E 80259~|~1~|~1~|~01/STR~|~Concrete bridge deck overlay for WAS 339 2013, SFN 8404380. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~35A244F3BC07F5C7E46A021A18B8A42C4B6F9507 96529~|~1~|~1~|~01/S>2~|~Generic Plan Split for traffic signal inspection in District 8~|~17 - Construction Engineering~|~A12688C525873ED283F83E4F4180B619FBB7F206 88522~|~1~|~2~|~02/STR~|~Structure work shall include the removal of the wearing course, replacement of the waterproofing, polymer modified asphalt joints and overlaying with asphalt.~|~13 - Bridge Rehabilitation~|~0F160250B3BDBC42F7A8FC811B98A8FCD31C66F8 88522~|~1~|~1~|~01/STR~|~Resurfacing the existing roadway on USR 36 from (SLM 17.20) the West Corporation Limit of Fletcher to the Miami/Champaign County Line (SLM 22.02) and on State Route 589 from State Route 55 in Casstown (SLM 0.05) to US Route 36 in Fletcher (SLM 6.47).~|~05 - 4R Maintenance - Resurfacing~|~A211F5501FA54B0FADC1F5E83F5747E8C2C1FF79 118645~|~1~|~1~|~01/S>2~|~Replace sodium light fixtures with LED lights~|~21 - Safety~|~3F3AC1DA5FF632B5CE1F4D1478EB5EB348CF187A 88893~|~1~|~2~|~02/IMS~|~See linked structure.~|~13 - Bridge Rehabilitation~|~725D74FC16BA55DFA4BA4677C6021F921B6A3FDB 88893~|~1~|~3~|~03/NHS~|~Resurfacing of POR SR 43 0.00 to 7.47 and 8.15 to 8.50~|~05 - 4R Maintenance - Resurfacing~|~C89518EF712234C8E38B38A774F7D27F38DBD380 88893~|~1~|~1~|~01/NHS~|~See linked structure.~|~13 - Bridge Rehabilitation~|~F3CB1EC14CEBDABFA0F70332164E1291C0660FB8 93316~|~1~|~1~|~01/SAF~|~Safety and local Marion County funding for new roadway (Univ Dr) from SR-529/CR-169 to SR-95/Univ Dr intersection~|~21 - Safety~|~3A25A9B479E7C864BC5C92C1CD6124DB9C955B47 93316~|~1~|~3~|~03/S<2/MAR~|~100% local funding for Campus Access signal~|~01 - New Construction~|~80C2F0266606B757C898302877D650D02DEE931C 93316~|~1~|~2~|~02/ENH~|~80% Enh & 20% Marion County for Enhancements:- lighting, walk, curbs, landscape mounding, plantings, aesthetic upgrades for mast arms all on new section of Univ Dr~|~01 - New Construction~|~E1EB1FA245EDD315D2657384FE5DED5BA16352E0 94399~|~1~|~1~|~01/STR~|~Resurfacing:MED-162-0.00 to 2.97MED-301 6.91 to 8.61~|~05 - 4R Maintenance - Resurfacing~|~8757D460536BDB1BCB3220E64EE5474D22E62887 94399~|~1~|~2~|~02/STR~|~MED-SR-301 07.000 SFN 5207533 (OVER COON CREEK) - Deck Sealing~|~13 - Bridge Rehabilitation~|~47E055043F51A7A349E9E3DF0DEC963BD3630D64 94399~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~FB2D7A408FC8DA153E3B53F71EC979DBCFC70D1A 119766~|~1~|~1~|~01/S5K~|~All work included in this split.~|~05 - 4R Maintenance - Resurfacing~|~4C05CCC2D9A86F462DF1F6E32CA6469C625FCB39 103739~|~1~|~1~|~01/SAF~|~Plan Split~|~21 - Safety~|~98FA65FE850851940BA2D104A336312D681878CF 119863~|~1~|~1~|~01/S5K~|~All Work Included in this Split~|~66 - Resilience Improvement - Highway Project ~|~34B4665116C088AEAA3C3ADBD64D690E214102B2 98552~|~1~|~1~|~01/STR~|~All work is in this split. Funding is 80% federal; and 20% state funds from the District Preservation Program SACs 4PF7 & 4PS7.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2DA56CA833B5A6D4E2422760CEE58AC830C04E78 109661~|~1~|~1~|~01/STR~|~Resurfacing HAS-646~|~05 - 4R Maintenance - Resurfacing~|~367FE7A7A333419F0ED0AACEA2BA6B730E57F4A5 117552~|~1~|~1~|~01/S50~|~To provide turn lanes on SR 43 at the intersection of SR 43 and CR 43 (Ross Ridge Rd.)~|~21 - Safety~|~EE1C5DD1241236171EBE79C1DAE202E906411DAE 90351~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~67D40A6366EEC7C28DABF7BDE1C63DB990C57740 124144~|~1~|~1~|~01/NFP~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~EA1B4F24A89BBB0F88B0015E3755589ADF1BAF10 84634~|~1~|~1~|~01/STR~|~HIG SR124 17.82 - 25.92HIG SR41 1.13-1.88~|~05 - 4R Maintenance - Resurfacing~|~3713D036B1397FDB61CA5DE2D7460E035AA5FB53 99453~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DBA4D70DDB5799079ABB1CB9B073E2C5FC639677 114621~|~1~|~1~|~01/NHS~|~Overlay on PIK 32.~|~05 - 4R Maintenance - Resurfacing~|~324E9121DEE7A550A6AED3C25B8D1DC8C8639BAF 116165~|~1~|~1~|~01/STR~|~Landslide repair. ATH 144 12.08.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~26CABCDFC5079ED11B08D310B56DF3A522BD6F56 93717~|~1~|~1~|~01/NFA~|~R/R Xing - Geometric Improvements~|~21 - Safety~|~AD24E6C01EE7438D5709E4277EBC53DBE42D1BEF 110348~|~1~|~1~|~01/MPO~|~Intersection upgrade by removing the concrete island, realigning the crosswalks on the northwest corner, new pedestrian push buttons, upgraded truncated domes to the current standard, resurfacing of the intersection pavement and a signal detection conversion to a non-intrusive detecting system.~|~04 - Reconstruction - No Added Capacity~|~1C486BA8AC77DC94FB1E40190184B09B93CC89AF 122882~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~D8A12DC2F11FCCCF4778AA328E919BBD0FE6BC02 106620~|~1~|~1~|~01/NHS~|~Addition of a left turn lane on WAS 7 18.00. Funded 80 federal/20 state.~|~21 - Safety~|~E4513154636D14D2B4F3AF206537A24CBC9515F9 97587~|~1~|~1~|~01/S<2~|~"01/S<2/OT/ " - Major/New 4BD7 (100% State) - No CAP - Demolition of acquired structures for the Cherry Valley Interchange at: 1) Lic-CR 128-00.83; 2) Lic-CR 539-07.46;~|~44 - Other~|~4F753013F35AB3DD9AEED54775F553FBC93BDC22 97587~|~1~|~2~|~02/NHS~|~"02/NHS/OT/ " - Major/New 4BD7 (100% State) - No CAP - Tree Cutting on the project - $250,000.00 from PID 80704 and $250,000.00 from other TRAC Funding~|~44 - Other~|~B95F6F92218431D835E35F317252DB2763A5F65F 117458~|~1~|~1~|~01/BRF~|~Bridge rehabilitation (SFN 5930324)~|~13 - Bridge Rehabilitation~|~6E9B8CFF827606E3F61E3ACE808112A2F5A876F5 96376~|~1~|~1~|~01/NFA~|~ District Preservation 4PS7(100% State) - No CAP - Bridge rehabilitation on 6402283 PER-204-9.42 Intersect: Over Johnathan Creek; Not BR Eligible: Length=132 SD/FO(0) SR=86.6 DSR=5~|~13 - Bridge Rehabilitation~|~392F0FFCB1E97C3AAF3610DC5EF84E8B9C5FF483 111581~|~1~|~1~|~01/STR~|~Resurfacing of 6 county routes in Mahoning County.~|~05 - 4R Maintenance - Resurfacing~|~BEF61AC46FD8D47BF768CCDE349229909C5740B6 111581~|~1~|~2~|~02/NFA~|~Resurfacing of MAH CR 59 Helsel Rd from 0.00 (Center St) to 0.05 (SR 14).~|~05 - 4R Maintenance - Resurfacing~|~9812E6149D8032537E99732AD422E3F557EADD58 95773~|~1~|~1~|~01/STR~|~Fropm SLM 16.18 to SLM 20.24~|~05 - 4R Maintenance - Resurfacing~|~14644A746B2F16219EB9F4293E6D016A1035C1FB 82830~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 329 14.60-19.65, and MRG 329 0.00-3.79. Rural other federal aid using 80 federal/20 state funds.~|~05 - 4R Maintenance - Resurfacing~|~38B881F3EFAFECF4347FD5074D038F7B7068D272 110852~|~1~|~1~|~01/SAF~|~Split for 90% safety/10% local funding~|~21 - Safety~|~4B0AA1B0AEE5D98D2ADF5E5CD104E73D965CAD43 125178~|~1~|~1~|~01/SAF~|~District wide raised pavement markings~|~21 - Safety~|~DCD9858B633AE6C9DC4865D74ACC4AEB370718D6 119991~|~1~|~1~|~01/BRF/BCEO~|~CEAO local bridge funded design build bridge replacement for BCEO. Detailed design and construction 100% CEAO funded.~|~10 - Bridge Replacement~|~1444E6E7CA5FDEC7CC7B1B093832883C721922E1 113258~|~1~|~1~|~01/MPO~|~Split for MPO funded eligible work.~|~05 - 4R Maintenance - Resurfacing~|~958D1C0ADF1A4A3B940A2E4803BD669246545B94 110808~|~1~|~1~|~01/NHS~|~Slide Repair.~|~04 - Reconstruction - No Added Capacity~|~98A54F73615D37ADB86DD9EB6C7E954412ECE2A7 122785~|~1~|~1~|~01/SAF~|~Intersection safety improvements~|~21 - Safety~|~00A6FA26C8DB9CFD703F4FC6894436794186CF61 112719~|~1~|~1~|~01/NHS~|~Bridge repair of various locations throughout district 6~|~13 - Bridge Rehabilitation~|~F8A5A0F291712893644E95014FF621EBEB7D6FED 101315~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split created for all of the routes within this project (all STP Rural routes)~|~05 - 4R Maintenance - Resurfacing~|~DE345BD091F53EBA4106E16B9F3480B30DACE295 101315~|~1~|~2~|~02/STR~|~CO CO Engr 01 plan split created for all routes within this project (all STP Rural routes)~|~17 - Construction Engineering~|~84D2FDC9EB4CAE5089950AEB759192864DAB436B 109135~|~1~|~1~|~01/STR~|~Construct sidewalks along Grove St and Graham St~|~21 - Safety~|~82C1B175CC11A08E0997198234FEEE03E841C42C 111079~|~1~|~1~|~01/NFP~|~Plan split for Federal/State exchange funds for bridge~|~13 - Bridge Rehabilitation~|~A3BD6758C7793F97A486D1446891A97F0DF1E9CF 119965~|~1~|~1~|~01/CMQ~|~Replace existing high pressure sodium lighting fixtures with LED fixtures for the streetlights along E Second Street ~|~44 - Other~|~31D6F9AEC5774EDDB39B101B0C5439294BDDCF4E 107477~|~1~|~1~|~01/NHS~|~Resurfacing: LOR 0006 15.87 to 21.23 FED/LOCAL 80/20~|~05 - 4R Maintenance - Resurfacing~|~7A0101B5DB8BF6E0AAD20DD459C41DFBD54A41F5 107477~|~1~|~2~|~02/NHS~|~Resurfacing: Resurfacing: LOR 0006 15.87 to 21.23 Local 100%~|~05 - 4R Maintenance - Resurfacing~|~1A40D3A58EA81C3B5095C15616EC67805EB95334 109878~|~1~|~1~|~01/STR~|~Test~|~05 - 4R Maintenance - Resurfacing~|~E2074B28743FEE1E97476FA19667D647A0A38CA8 91756~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. NOB 564 0.04-13.48. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~8C62F2C822338648C7E258E80DAA40EC71DF1DD7 91756~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. MOE 145 0.00-8.50. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C6FF180E9819ABC49BDD9DBBA6845870131C4336 103743~|~1~|~1~|~01/SAF~|~This plan split covers the entire cost of the project, which will be to demolish a structure or a portion of a structure to improve sight distance at the intersection of SR-732 & Stillwell Beckett~|~21 - Safety~|~3B00DA31E3DC040DC4A51C24064869F9A218DA24 103172~|~1~|~1~|~01/CMQ/GREE~|~Construction of roundabout on State Route 241 (Massillon Road) at Corporate Woods Circle, in the City of Green, Summit County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~0EC19F0CC4B50B9B07A1CA3F05A82A25AC949CB4 103172~|~2~|~2~|~02/CMQ/GREE~|~Construction of roundabout on State Route 241 (Massillon Road) at Boettler Rd/Franks Parkway, in the City of Green, Summit County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~E8392CE19949D3B27B098F9C0E42EF0CCCA6FC02 100186~|~1~|~1~|~01/S<2~|~CLE SR 131 SLM 22.4 to 22.66 Project to relocate a ditch encroaching the pavement on SR 132 in Clermont County between Parker and Heritage.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~523C439B0465D4F70BEC73365A2D4B0C924197EB 110984~|~1~|~1~|~01/BRF~|~Bridge Replacement.~|~10 - Bridge Replacement~|~1C9F14B71C20C717E051216B5801CEE54E2E9D7B 87273~|~1~|~2~|~02/IMS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~51D19ED8EDD9B78804876FBDC0C2FC6FC28DA620 87273~|~1~|~1~|~01/IMS~|~Resurfacing MAH IR 680 from 7.05 to 12.00~|~05 - 4R Maintenance - Resurfacing~|~CEC4329AF16B894062D907C47A9D66C76ED36C97 87273~|~1~|~3~|~03/NHS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~3E59DBB3703F5985FACA7E887C80898B668B7437 124974~|~1~|~1~|~01/STR~|~Plan split for resurfacing STP Rural roadway~|~05 - 4R Maintenance - Resurfacing~|~926FD055D3344FF12A8E26A215618FDEFDF61BF8 101395~|~1~|~1~|~01/STR~|~CLI SR 134 - Partial Depth Repair 2'x3" edge GRE SR 72 - Slot paving, 15% - 20% GRE SR 343 - Slot paving, 15% - 20%~|~05 - 4R Maintenance - Resurfacing~|~4E446606D248A8340F710340955A99A3DEB5E7C8 101395~|~1~|~2~|~02/NHS~|~Turn lane work on US35 - NHS Route.~|~05 - 4R Maintenance - Resurfacing~|~7FAFFD96BA943DC573995F72B8B57722FE77FFE4 92156~|~1~|~1~|~01/IMS~|~100% State Preservation funds~|~21 - Safety~|~B48ACE91232348636C24CC61EE49A824A747FB05 120885~|~1~|~1~|~01/BRF~|~All work on CR 11J associated with the bridge replacement ~|~10 - Bridge Replacement~|~F2E7B863AAA240E298E13A11C33BA37487CCF81B 97296~|~1~|~1~|~01/IMS~|~Building Demolition.~|~44 - Other~|~576290611CD5726E7C70BE27E2B1642F177AF9A5 84285~|~1~|~2~|~02/S>2~|~80/20 state/local urban paving funding split in State STP for the section to be resurfaced within the City of Garfield Hts. For this project, the funding will be 100% state.~|~05 - 4R Maintenance - Resurfacing~|~1EB2F79B5801A53C4DAB76A91D4D77B3F291C534 84285~|~1~|~3~|~03/S>2~|~100% local funding for ADA compliant curb ramps and other non-urban paving eligible items.~|~05 - 4R Maintenance - Resurfacing~|~67D9D1A2E115C94DF8D849BC5306FF56D193F123 84285~|~1~|~1~|~01/S>2~|~100% State STP for the section to be resurface within Village of Valley View.~|~05 - 4R Maintenance - Resurfacing~|~E964FA2B233C03CC4F39550AFB1C6ABA34D6A7DB 87238~|~1~|~1~|~01/STR~|~HIG SR28 0.00 - 7.27 Resurfacing ProjectOn SR28, from the Clinton County line (SLM 0.00) east to the Leesburg corporation limits (SLM 7.27), it is proposed to resurface the highway with aspahalt concrete.Pave Thru Brdgs:600025 HIG SR28 1.99 Intersect: Branch Of Lees Creek3600076 HIG SR28 2.27 Intersect: Br Of Lees Creek3600238 HIG SR28 5.79 Intersect: Trib Of Middle Fk Lees Cr80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~794ED87BED2A619EF5F8F48EDDA90D049A64095A 87238~|~1~|~2~|~02/STR~|~HIG SR28 0.00 - 7.27 Resurfacing ProjectOn SR28, from the Clinton County line east to the Leesburg corporation limits. Brdgs for Rehab:3600092 HIG SR28 2.55 Intersect: Br Of Lees Creek3600114 HIG SR28 2.7 Intersect: South Fork Of Lees Creek3600157 HIG SR28 3.96 Intersect: South Fork Lees Creek3600181 HIG SR28 5.19 Intersect: South Fork Lees Creek08/20/splits02/STR/BR/State~|~13 - Bridge Rehabilitation~|~BABE7D0B4161806302B3BF746C016409EACC8941 107764~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacement on various routes throughout Mahoning, Portage, and Trumbull County.~|~21 - Safety~|~2BDE64FC3D665C20B0CEB3A295A5ECAEA5A69168 100986~|~1~|~1~|~01/NHS~|~Emergency job to repair flood damage on JAC 35 (25.20).~|~04 - Reconstruction - No Added Capacity~|~A38395BBA9D2E5A7F44A861C45B1578BBE9A4947 94466~|~1~|~2~|~02/NFA~|~CRA-39-4.02-7.61 Chip Seal segment~|~05 - 4R Maintenance - Resurfacing~|~095567DDB2318A276588951C60F6997F8DDADA4F 94466~|~1~|~3~|~03/S<2~|~S<2: HUR-162-5.97-8.09 Chip Seal segment~|~05 - 4R Maintenance - Resurfacing~|~0A5DB6B11F915E5797FFA5605BD9C1B091798575 94466~|~1~|~1~|~01/STR~|~CRA-598-5.10-8.95/9.20-11.00 Chip Seal segmentsHUR-162-0.00-5.97/8.09-8.94 Chip Seal segments~|~05 - 4R Maintenance - Resurfacing~|~D60695144BF0649A841B194B7372F6A9527A67BE 125690~|~1~|~1~|~01/NFA~|~Plan split for lighting maintenance~|~21 - Safety~|~56CDB9DF6E15250A8954B99CCC0B7D7701731129 125690~|~1~|~2~|~02/SAF~|~Plan Split for TSMO funded scope.~|~21 - Safety~|~B1D974CD27630DB4C402E393D420274114028FEF 126107~|~1~|~1~|~01/NHS~|~Plan split for all work associated with SEN-23-1036~|~10 - Bridge Replacement~|~914BAEC9BC2BD0230AE63E1412F6807CC30ACBCD 101071~|~1~|~1~|~01/STR~|~Overlay SR 274 in Logan County with a fine graded aggregate: LOG SR 274 SLM 4.81 to 10.30 = = LOG SR 274 SLM 15.78 to 22.64.~|~05 - 4R Maintenance - Resurfacing~|~E1FDD2FFF512DB811370C283FD4F885A2AB120C0 98559~|~1~|~1~|~01/STR~|~Plan Split for the resurfacing of the rural portion of SR 128. Location between SLM 6.72-10.75~|~05 - 4R Maintenance - Resurfacing~|~E557CA9534936C9E6B15745F7DDB0E9539AE8D5C 98559~|~1~|~2~|~02/S>2~|~Plan split for resurfacing the Urban portion of SR 128. Limits are SLM 5.25-6.72~|~05 - 4R Maintenance - Resurfacing~|~24269F90F7A5470A60C351CA3CBB155F62982B38 107949~|~1~|~1~|~01/NFP~|~D7 General construction inspection~|~17 - Construction Engineering~|~42D1F5CECA5E2B71A38D362AC5841BF04770879F 124792~|~1~|~1~|~01/NFA~|~Filling in sidewalk gaps at 5 City of Columbus Elementary Schools, 3 new crosswalks at 1 Elementary School ~|~28 - Facilities for Pedestrians & Bicycles~|~07EFCB0D60DA8F706BB3BC154D27EEA51BB39D5A 113659~|~1~|~1~|~01/MPO~|~Resurfacing with pavement repair on Clearcreek-Franklin Road from SR 73 to the northern City of Springboro corp. limit.~|~04 - Reconstruction - No Added Capacity~|~16F35AF60E6049E067233E20BF78F3AD47C5EBCB 122511~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes~|~21 - Safety~|~AFC662AC3F94A6F03DDFA3B80A49E76E9752498B 96566~|~1~|~2~|~02/STR~|~100% Bonds capped at $567,009.89~|~05 - 4R Maintenance - Resurfacing~|~60D5574633D0772CEF1A2815DAB04C369B928218 96566~|~1~|~1~|~01/STR~|~STP 80/20 Resurfacing. Includes bridges.~|~05 - 4R Maintenance - Resurfacing~|~8281E20B93DEF0370C16DADA8829C804584C2D57 96995~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/PV/LANC" - City of Lancaster project for improvements to Ewing Street utilizing ODOT MPO/Major City Funds.~|~04 - Reconstruction - No Added Capacity~|~A220C8B9A4BE77CC5F6FDA78AE18196D983406AD 87338~|~1~|~1~|~01/NHS~|~Resurfacing on US 22~|~05 - 4R Maintenance - Resurfacing~|~27752DC0E043F6A3ED6EDD8CC21FD4265F95339D 106905~|~1~|~1~|~01/STR~|~Slide repair LAW 378 6.70~|~04 - Reconstruction - No Added Capacity~|~33FA45FF128B7BCF271BD1F190483BF5FC146A1E 127179~|~1~|~1~|~01/NHS/NFRA~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D445A0ADD78D4BEA957D1295C9BAEDEAE0A77375 127179~|~1~|~2~|~02/NHS/NFRA~|~Sidewalks, excavation, subgrade, curb ramps, catch basin, partial depth repairs and seeding.~|~04 - Reconstruction - No Added Capacity~|~6224A29E8C15A9FB9C052EE579CEDD96FE4A9194 95408~|~1~|~1~|~01/NHS~|~Remove and replace LMC overlay with LMC overlay using hydrodemolition. Rebuild deck edges, and put in new expansion joint, rubber gland system. SFN 1902466 & SFN 1902490 over Greenville Creek.~|~13 - Bridge Rehabilitation~|~CB226E6BD52974D4F702AA311BBB33B64AA1B6C9 97948~|~1~|~1~|~01/STR/GCEO~|~"01/STR/PV/GCEO" Guernsey Co. resurfacing approved CEAO federal funding cap $1,971,120 at 80%~|~05 - 4R Maintenance - Resurfacing~|~712283EB63692EB779A147DA864D4769233154BB 97948~|~1~|~2~|~02/S<2/GCEO~|~"01/S<2/PV/GCEO" Guernsey County Engineer Minor Arterial - CEAO Max $1,971,120~|~05 - 4R Maintenance - Resurfacing~|~46B1CA00CF34967B2E4902993CD49E52BA18BE15 104380~|~1~|~1~|~01/IMS~|~Split for pavement work on mainline I-271~|~~|~28147A31D4FEF25E7B24A022781395A0A39317E2 91281~|~1~|~1~|~01/STR~|~BRO SR41 2.80 OH11-02On SR41, begin project 2.25 miles north of the Aberdeen corporation limit. BRO-002 CO CC 01 - added plan splits for slide repair (OH11-02)80/20 split01/STR/OT/State~|~44 - Other~|~B9477D2F8C6B5E3D62E0A0D29170C6D28DC80506 115492~|~1~|~1~|~01/BRO~|~Split for Type A emergency bridge work~|~47 - Bridge Preventive Maintenance~|~38302E52000740F9D7EFCE1577EC7D72A7CAF2C4 102527~|~1~|~1~|~01/IMS~|~This plan split is for the bridge repair due to bridge strike.~|~13 - Bridge Rehabilitation~|~E2FCA66093BF6219AC2B3F78DF44400F13EE20A0 100792~|~1~|~1~|~01/IMS~|~Remove and replace existing barrier, replace existing guardrail with barrier, guardrail work.MOT IR 75 SLM 20.30 to 20.55MOT IR 75 SLM 16.20 to 16.26~|~21 - Safety~|~8B9E3BD785587C8237157FAC6A6B7849554A18F4 100792~|~1~|~2~|~02/NHS~|~Remove and replace existing barrier, replace existing guardrail with barrier, guarrail work.MOT SR 4 18.40 to 18.44~|~21 - Safety~|~6BE9C2409CF0067587D854A5EA8CBF6670C7F288 100792~|~1~|~3~|~03/IMS~|~Bridge Painting on beam~|~21 - Safety~|~79E245149588884EBE51C80CBE89175271E23E3D 102063~|~1~|~1~|~01/NFA~|~TID is constructing Hines Hill, project including, but not limited to roadwork improvements by widening a 3 and 4 lane road with turn lanes, traffic signal, and other safety improvements.~|~01 - New Construction~|~E629703877587F56A531F0D4A55FB35213235B75 95322~|~1~|~3~|~03/NHS~|~4001605 JAC -SR -93 27.320 51.3 4001613 JAC -SR -93 27.320 51.0 Mill & Fill & new joints on both structures80/20 w/local match~|~13 - Bridge Rehabilitation~|~6E6253774FFB877338A7B3CEAD32D718DB9E7F1E 95322~|~1~|~1~|~01/NHS~|~JAC SR93 25.79 - 28.18N P 781 NHS Non-Interstate Other Principal Arterial WELLSTON Urban Paving80% fed/20% local ~|~05 - 4R Maintenance - Resurfacing~|~C67A714325A478BA321A9D16C66867A8693F46CC 95322~|~1~|~2~|~02/S<2~|~JAC SR93 24.46 - 25.79O M 781 Other Federal-Aide Highway Minor Arterial WELLSTON Urban Paving80%fed/20% local match~|~05 - 4R Maintenance - Resurfacing~|~D215AB3E3376127E7480A17CDBF42DE82B36D39A 106123~|~1~|~1~|~01/S>2~|~Reconstruction in the City of Dayton on Salem Ave from Grand Ave to Superior Ave to include pavement, curb sidewalk, lights and catch basins.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2227B7A8B0B8E67E0E2B8CF4DDDBA1645B6FB8B1 109338~|~1~|~1~|~01/NFP~|~ODNR Maintenance Course Fog or Micro entire facility at East Harbor State Park~|~44 - Other~|~12B612B27A6B8D2BEA71E0C5D1E7478B0FA21824 107019~|~1~|~1~|~01/SAF~|~Guardrail repair and upgrade in District 8~|~~|~76C0E1881D13B075FCB16C736E5C3406AB9B8F8A 107019~|~1~|~2~|~02/SAF~|~Guardrail repair and upgrade in Montgomery County in D7~|~~|~7F19D2D09831CDA5ABBD6EA0DBEA8A79CA1EDCE5 83444~|~1~|~1~|~01/STR~|~Roadway work~|~04 - Reconstruction - No Added Capacity~|~B7D162F955818B3ECBDE739890B66B1883CA6C50 83444~|~1~|~2~|~02/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~F5B31ACEDBA5D6E26E8A260D01A2F70089C1EE0A 119949~|~1~|~1~|~01/STR~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~B5BA178AA7ACD58187A07E50188EDD486FE98C3D 101128~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete: MIA US 36 SLM 13.46 to 17.20CHP SR 29 SLM 0.00 to 2.36~|~05 - 4R Maintenance - Resurfacing~|~0783958A26783D98955930117B58CB289D5B7A35 101128~|~1~|~2~|~02/S<2~|~Overlay US 36 in Miami County with asphalt concrete: MIA US SLM 12.60 to 13.46~|~05 - 4R Maintenance - Resurfacing~|~BE364E9A94E178516D83BA9BEAB91F05129B82C9 99570~|~1~|~1~|~01/SAE~|~Installation of new and upgrade of existing guardrail on County routes within Ashland County.~|~21 - Safety~|~8A92BD2AF4FE6E5561B4B25C9BEB2068F12C55D4 91051~|~1~|~1~|~01/BRF~|~Bridge repair on DFN 7706871 over Cuyahoga River, RR and Bikepath~|~13 - Bridge Rehabilitation~|~A1E62D6F53CC0BFC16191EF4A4C5F5DCD40A5B7C 126736~|~1~|~1~|~01/ENH/WARR~|~Sidewalk repairs/replacements.~|~28 - Facilities for Pedestrians & Bicycles~|~AC3B89F98155F9B5DB586F9700BB912492BC0347 123555~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation repairs on interstate bridges at various location in Cuyahoga county~|~47 - Bridge Preventive Maintenance~|~41E775BDBF9CFF98B319B3D1F7FE9686073C1AD9 111497~|~1~|~1~|~01/SAF~|~Various ITS maintenance activities~|~21 - Safety~|~97C1C581CEC469FFF28068C82FC866DF1871110C 111497~|~1~|~2~|~02/IMS~|~Install new cameras on IR 270 using TSMO funding.~|~21 - Safety~|~93EB451B660EFCF777FF2FD6353B5D82DD5EF5AC 90665~|~1~|~1~|~01/NHS~|~LUC-SR2-21.24 to 22.51~|~17 - Construction Engineering~|~F94F50B7A2C514422BBDE0095862651F5A0635C3 116999~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~77700152089830CCD386AC8035196CCDFBC362FD 94251~|~2~|~2~|~02/STR~|~Resurfacing in Defiance County designed with PID 107697 to be sold as Part 2. Funding is district preservation funds (80% 4PF7 and 20% 4PS7). No local funds~|~05 - 4R Maintenance - Resurfacing~|~312F7E59174CEA7DADE6B3A440BAA2CC382E4D46 94251~|~1~|~1~|~01/NHS~|~Resurfacing work on US 30 in Allen County. District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap~|~05 - 4R Maintenance - Resurfacing~|~6AFE4BC5F90F872AE0CA4E6A8F33A7F3C28856B2 94251~|~2~|~3~|~03/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds. Designed with PID 107697~|~21 - Safety~|~4FF83D35493191E5872FAB8345DC4B507C3E7572 94251~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~35805A449733137F5BDC4B535C152EE6CFA4F9AF 115458~|~1~|~1~|~01/SAF~|~SRTS funds for sidewalk installation~|~28 - Facilities for Pedestrians & Bicycles~|~A9E5716442F87B1D416E3372FFA5B9DF609821A0 102902~|~1~|~1~|~01/NHS~|~SEN-224~|~05 - 4R Maintenance - Resurfacing~|~C286969F49F3FE8ACC0D1BDB986930F67886BB18 102902~|~1~|~2~|~02/STR~|~Rural~|~05 - 4R Maintenance - Resurfacing~|~9F595F6982524698CA1DECA7B54EAEFEA5CB4A4E 123813~|~1~|~1~|~01/S>2~|~Urban Paving plan split~|~05 - 4R Maintenance - Resurfacing~|~16D1BB11ED0149B932FB981926A9FA2D0CAAE4D9 123813~|~1~|~2~|~02/NFP~|~100% Locally funded plan split for repairs, curbs, ramps.~|~05 - 4R Maintenance - Resurfacing~|~9676B42881F61F76EADB80E3D6465F55EE30BD54 95271~|~1~|~1~|~01/NHS~|~Culvert Replacement ADA SR32 9.92N P 000 NHS Non-Interstate Other Principal Arterial RURAL 80/20 split~|~44 - Other~|~E148D264CAAA2D80F56545D46ECD3513601E6181 127154~|~1~|~1~|~01/MPO~|~Created plan split ~|~28 - Facilities for Pedestrians & Bicycles~|~B5D6EF14529C7356C614275A6F30CDDD74A3357C 94458~|~1~|~1~|~01/NFP~|~Epoxy pavement markings on STA-US30 and STA/SUM-IR77 in Stark and Summit Counties, Ohio.~|~21 - Safety~|~69D8C8A0A474A56DA47A8A20CFF4B3F8BF136DB0 94474~|~1~|~1~|~01/NFP~|~Annual lighting maintenance contract district wide.~|~44 - Other~|~B326E89757DD21568EE95125CA9C95D4756A8794 125806~|~1~|~1~|~01/IMS~|~Signs~|~44 - Other~|~76E3F304B1066440B007033C456FA75B624BC49D 119994~|~1~|~1~|~01/NHS~|~Smoothseal WAY-30-19.469 to 26.467~|~05 - 4R Maintenance - Resurfacing~|~5DEFA42C995D34C65C4B862E72BFF70C9C72DB68 97220~|~1~|~1~|~01/BRF~|~Construction engineering consultants for OBPP.~|~17 - Construction Engineering~|~E6E7DA05383A408255EB400D33921C1EB35125DC 116357~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 43 over Branch of Goose Creek. In stream work will be required.~|~04 - Reconstruction - No Added Capacity~|~743B3BC5336B87A9DD74034CB124119A9E3731AA 101101~|~1~|~1~|~01/BRF~|~CEAO funded bridge replacement~|~10 - Bridge Replacement~|~FDF4C3E7C379F7E6601B0A163DD02328BE49FEEF 114406~|~1~|~1~|~01/S<2/LANC~|~"01/S>2/PV/LCAN" - resurfacing and related work on Sixth Avenue. 80% Federal (4TA7) and 5% Local (LNTP) - 15% TRC added 05-16-22.~|~05 - 4R Maintenance - Resurfacing~|~C821C75DDE765F42A758E887C0B5621EBA00C0F2 83910~|~1~|~1~|~01/STR~|~Resurface the existing roadway along with other roadway related items in North Lewisburg on State Route 245 from the South Corporation Limit SLM 21.61 to the Champaign/Union County Line SLM 22.54~|~05 - 4R Maintenance - Resurfacing~|~1B37AC6E9C11C5E56F7B9559EFA126E5F865E5A1 83910~|~1~|~2~|~02/NFA~|~Resurface the existing roadway along with other roadway related items on State Route 559 from SLM 3.52 to 3.55.~|~05 - 4R Maintenance - Resurfacing~|~B2C40FFF1D384CD1B6AD88F67937A2E14D98573F 101251~|~1~|~1~|~01/NFA~|~PLan Split for all ODOT paid for work on roadwasy, sidewalks, curbs, ramps, and drainage~|~44 - Other~|~478FB89D4A937F1A3738038D706FAA40E3689589 101251~|~1~|~3~|~03/NFA~|~Plan Split for all work paid for by CSU~|~~|~E08F45A065753CE3454F716FA10E43B53F36F7AB 101251~|~1~|~2~|~02/NFA~|~Pedestrian crossing upgrades to be installed at 100% Safety funds.~|~21 - Safety~|~E8368D26FC22BDB00D98AE3DA12CFA1EB6BA0C6B 89330~|~1~|~1~|~01/STR/ADA~|~Harshaville Covered Bridge in Adams CountyProject is 1.343 miles south east from SR247. Project Description: It is proposed, on the Harshaville Covered Bridge in Adams County, to install new siding & roofing, repair the existing roofing support system, apply fire retardant, replace existing back wall, improve lateral bracing, elevate the structure, replace the wood deck, add new guardrail, and replace the old steel beams with new painted steel beams. ~|~32 - Historic Preservation~|~ACF3368E4EB63A66FFD52787EA67891A3C828595 118742~|~1~|~1~|~01/IMS~|~Concrete Pavement Repairs on I-70~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0233417C891EF61464E99CC37E84913E2F2AFCFC 121503~|~1~|~1~|~01/NHS~|~Repair bridge carrying SR 7 over Norfolk Southern railroad.~|~13 - Bridge Rehabilitation~|~5D96249E88B74C5BAFC55789EDBD4D7A367A7235 119370~|~1~|~1~|~01/SAF~|~Reconstruct about 1 mile of Second Creek Rd, improving vertical and horizontal curves as well as widening the pavement and berms and removing fixed objects from the clear zone. ~|~21 - Safety~|~E8D2ED1B2B599BED222DA7C678DCEC3ADAFF601D 112591~|~1~|~1~|~01/STR~|~Rural Portion of SR 736 - SLM 0 to 7.55~|~05 - 4R Maintenance - Resurfacing~|~F8966C182CB05CCC4434EF284B5F2649F52CAFE7 112591~|~1~|~2~|~02/S<2~|~Resurface SR 736 from SLM 7.55 to 7.95~|~05 - 4R Maintenance - Resurfacing~|~4F4974EBE3B7F32A38BD5C1625DD9393A2473893 121258~|~1~|~1~|~01/NFP~|~added HS plan split.~|~44 - Other~|~04CB8ECC19D025D735602F4E5F8FBA14DDE25C24 121350~|~1~|~1~|~01/NHS~|~Plan split for work on SR-2 and Ramp from SR-2 to SR-269~|~~|~D0E433B71712B944B7CE83EDC82CFF7BC75523CC 121350~|~1~|~2~|~02/STR~|~Plan split for work on SR-269~|~~|~07AE4FDAAD87CA74E2F6362FF708DD5C03862B8D 103754~|~1~|~1~|~01/SAF~|~Improve ramp capacity on IR 75 at Tylersville Road - BCEO.~|~21 - Safety~|~308AB3DB93E85C79569D429CB5844D591F4164D4 117199~|~1~|~1~|~01/SAF~|~Plan split for PHB locations, with 90% HJ7 funding.~|~21 - Safety~|~1844557394549F2A87D667FA31F6AD9FE00C67B3 117199~|~1~|~2~|~02/SAF~|~Plan Split for RRFB locations funded by 90% 4HJ7 + 10% 4BC7.~|~21 - Safety~|~586BF01464B0BD9E9A54E58437E86C65FD77E872 98343~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on NHS routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2612AD51BB727ACB822EB91B3AEFDD615F37EB7C 98343~|~1~|~1~|~01/STR~|~District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Full Depth Repairs and Spot Paving on OFAH-Rural routes in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EF5D941728076521142E0BCB7BA3B1D8022FBFE6 98343~|~1~|~3~|~03/IMS~|~District Preservation 4PF7 (90% Federal)/4PS7 (10% State) - No CAP - Full Depth Repairs, Concrete Patching on Interstate in District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3DBA8810733E0B045F437F8C8F29131B44700CD6 108890~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~BEFA4BA1BA3258F72107A5147E8C38F7C88A7B32 88252~|~1~|~1~|~01/IMS~|~LUC IR475 8.8-9.54~|~03 - Reconstruction - Added Capacity~|~A2333B4F3B5A7B1DEF40DF71B4C024952885E750 88252~|~1~|~2~|~02/IMS~|~4800605 LUC US20 9.54 Intersect: Ir 475~|~10 - Bridge Replacement~|~C14DA89337232F051B0D4A7BEF63F09C1632CAF3 88252~|~1~|~3~|~03/NFP~|~Construction Requested Split for new Part Code: The contractor hit a sanitary line maintained by the Lucas County Sanitary Department that was mismarked. The Lucas County Sanitary Department agreed to reimburse The Department/Contractor for performing the necessary work to fix the sanitary line.~|~~|~15C40DE8C144A8E9C29F290F9B15E17B3DDDE0A0 85582~|~1~|~1~|~01/NFP~|~District Maintenance/Preservation Project - 4CP7/4PS7 (100% State) -District wide Ash Tree removal project~|~44 - Other~|~F9863DD3C0302F04D2BD6A50182E1B326ECAA5AB 96691~|~1~|~1~|~01/IMS~|~AC Overlay with Repairs on:HAM-71 SLM 16.66 to 17.84HAM-71 SLM 17.84 to 19.91Some ramps to be included in the project.~|~05 - 4R Maintenance - Resurfacing~|~47AD2D8B61CC5044F048DCB4414A9C8F966009E5 96691~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~9893EE9FC358F934F320458B7034294CDCA5CB66 93574~|~1~|~1~|~01/MPO~|~100% City of Huron items~|~04 - Reconstruction - No Added Capacity~|~11AF8E5ED16932A9E0B17E4DDEB459C5DB4C5474 93574~|~1~|~2~|~02/MPO~|~Realign and resurface Main Street including streetscape components. Portions of Main Street are on the Federal Aid System and eligible for federal funding.~|~04 - Reconstruction - No Added Capacity~|~3107C701901F16F2EBB185485D7ADA838F41549E 121939~|~1~|~1~|~01/BRO~|~Plan split for damage repair on LUC-2-2124 bridge.~|~13 - Bridge Rehabilitation~|~5D58C07A1E6E0CF32A92026335A90EA9298E93C5 90385~|~1~|~3~|~03/S>2/ETNA~|~"03/S>2/OT/ETNA" - City of Reynoldsburg Funded through Etna Township - 4BG7 (100% Local) - No CAP - Relocation of City of Reynoldsburg Water & Sewer lines outside of the City Corporation Lines~|~01 - New Construction~|~FA976EB060EBD3B9099593735A2371888020E1F8 90385~|~1~|~5~|~05/CMQ/ETNA~|~"05/CMQ/OT/ETNA" - MORPC CMAQ Funds - 4TB7(80% Federal)/ 4BG5 (OPWC)/4BG7 (20% local) - MORPC CAP is $29,668.30 and OPWC CAP is $9,921.10- Roadway reconstrucion for extention of storm sewer down township roadway to stream. (TR219) Etna Township holds the contract for Violet Township~|~01 - New Construction~|~5AE5465DC77E3D4D398F0D540AE649D789778EB1 90385~|~1~|~2~|~02/CMQ/ETNA~|~"02/CMQ/OT/ETNA" - MORPC CMAQ Funded - 4TB7 (80% Federal) / 4BG6 (OPWC)/4BG7 (20% Local) - MORPC CAP $356,019.58 for Construction Phase and OPWC CAP of $99,211.00 - Roadway reconstruction and addition of sidewalks in Reynoldsburg on: 1) Lic-TR 169-4.60 to 4.79; 2) Lic-TR 169-5.33 to 5.35; 3) Lic-TR 169-5.50 to 5.57;~|~01 - New Construction~|~454B2B687DC03875372D7F5CFA72182213900FE0 90385~|~1~|~1~|~01/CMQ/ETNA~|~"01/CMQ/OT/ETNA" - MORPC CMAQ Funded - 4TB7 (80% Federal) / 4BG6 (OPWC)/4BG7 (20% Local) - MORPC CAP $2,581,141.93 for Construction Phase and OPWC CAP $882,977.90 - Roadway reconstruction and addition of sidewalks on: 1) Lic-TR 169-4.79 to 5.33; 2) Lic-TR 169-5.53 to 5.50; Additionally, add a new signal at Taylor & Palmer Roads *** NOTE: "CO CC 1 PE Payback" is capped at $240.131.61 ***~|~01 - New Construction~|~67F916EECF7B160830F72AA3FD3A379A539F6644 90385~|~1~|~4~|~04/S>2/SWLC~|~"04/S>2/OT/SWLC" - South West Licking County Water & Sewer Funded - 4BG6 (OPWC)/4BG7 (100% Local) - CAP 4BG6 (CQ35R/CQ36R) of $280,590.00 paid at 50%/50% - Installation of South West Licking County Water & Sewer lines~|~01 - New Construction~|~1D04E6EFC177893DE42CF6A9006678CF1B7ACCB4 124238~|~1~|~1~|~01/IMS~|~Plan split for roadway work~|~03 - Reconstruction - Added Capacity~|~2FACF249654A058DD7CBD85C23B88E04F6012210 95922~|~1~|~2~|~02/NHS~|~Resurfacing and related bridge maintenance work outside of city of Newark~|~05 - 4R Maintenance - Resurfacing~|~89BE3130542F38C2C0C122EF423D7DCD323B5E17 95922~|~1~|~1~|~01/NHS/NEWK~|~Resurfacing work within city of Newark~|~05 - 4R Maintenance - Resurfacing~|~CABFFF7F2433AB9F60705A5AD4AC05DB1738C193 95922~|~1~|~3~|~03/NHS/NEWK~|~Resurfacing work within city of Newark~|~05 - 4R Maintenance - Resurfacing~|~7B3F2040770CF8FBBA29EC0B7ADDC559A2FF1269 114878~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~D601E5755B477835A69B09B8F0836217B2A5391B 113978~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 124 38.47 (SFN 5302919) and 38.48 (SFN 5302943).~|~04 - Reconstruction - No Added Capacity~|~94E6CE2355DF39DDE323B2BB7CE953A821214E48 104685~|~1~|~1~|~01/NFA~|~PIK CR VAR PM FY22~|~21 - Safety~|~B20DE29D59065643417375E625383B0BFDD6CD76 123451~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SR 9 to SLM 3.62~|~05 - 4R Maintenance - Resurfacing~|~EA1ACCD39DA02D7DC6F1E3C4083365DEBCF339EB 123451~|~1~|~2~|~02/S50~|~Resurfacing SR 147 from SLM 33.62 to SR 7~|~05 - 4R Maintenance - Resurfacing~|~8BEA91EC12632390798CE03FBDD344539EAA40E1 125766~|~1~|~1~|~01/S>2~|~Plan split for large urban locations~|~04 - Reconstruction - No Added Capacity~|~DE25ADE85C5CADC3EAB713D08AC410440CE14685 102180~|~1~|~1~|~01/NFP~|~Construction of the new garage facility for Geauga County.~|~01 - New Construction~|~AEA8CF6FD68D0F16B38C55B49464E2C162CD2322 105885~|~1~|~1~|~01/ENH~|~Construction of bike/ped shred use path along SR 7 from North 4th Street to LaBelle - 80% TAP/20% Local.~|~44 - Other~|~E6765D617BCC8697AE41054C9C4A8BA580940E27 112543~|~1~|~1~|~01/MPO~|~AMATS funded resurfacing~|~05 - 4R Maintenance - Resurfacing~|~19B6BC766989651C00BEA8FBE85FCEB6875F5E8C 103258~|~1~|~1~|~01/STR~|~Overlay on rural routes: CHP SR 559 SLM 0.84 to 7.89~|~05 - 4R Maintenance - Resurfacing~|~D35DAF8A3941C38312FE5CC8EAB1836F344884AD 105642~|~1~|~1~|~01/NHS~|~AC overlays with repairs on NHS route.~|~05 - 4R Maintenance - Resurfacing~|~93831025AA2AF3977A0BDDBE52BB4F13F731C55A 96772~|~1~|~1~|~01/STR~|~Two-lane resurfacing project on WAS CR 25 1.15-7.73. Includes striping, spot base repair and minor guardrail reconstruction and repair. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~2B6B64F48D609B62AC188C69A5BEC2121A81FEA2 105366~|~1~|~1~|~01/NHS~|~Smooth seal on NHS routes: MOT SR 4 SLM 4.49 to 7.13 & SLM 8.13 to 11.88.~|~05 - 4R Maintenance - Resurfacing~|~EC31B5D4BA199183F746E64860FAE4F331C9E43A 112692~|~1~|~1~|~01/NHS~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items):~|~05 - 4R Maintenance - Resurfacing~|~82165F4C41EA2FB25EAB1E7D641874B94751D540 112692~|~1~|~2~|~02/NHS~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):~|~05 - 4R Maintenance - Resurfacing~|~6E4B229DCCE1EE8100BB644FE2AA4F8733953F09 103952~|~1~|~1~|~01/NHS~|~SFNs 6200729 & 6200753~|~13 - Bridge Rehabilitation~|~42AD43FA4F7D99FFABEE0E4CBF5056C0E97F6A95 126072~|~1~|~1~|~01/SAF~|~Plan split for traffic signal upgrades~|~21 - Safety~|~490AA2A9AEB81DB03E81DC2FD91DFD7D7F726B0C 112827~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~BC9E0BE351E7F281F9FBE4D16E63F272919726EE 109233~|~1~|~1~|~01/NFP~|~2019 Operations Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~7E871E925E1F13234CF3CD873400DC29904EDB3E 102333~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads in Miami County.~|~21 - Safety~|~43608EE7B3FB6B0EDE047C599876A65F22274452 102637~|~1~|~1~|~01/STR~|~Bridge Replacement: HUR-162-17.42 (SFN 3903060)~|~04 - Reconstruction - No Added Capacity~|~501D44CDADBF77668EBA96EE85083164DB523F5E 105102~|~1~|~1~|~01/STR~|~PIK 776 0.50 (SFN 6603335) replacement~|~10 - Bridge Replacement~|~9C8292540DE69FBE2B92A273AC7888C63CB2F058 126012~|~1~|~1~|~01/STR~|~Culvert liner project. VIN 50 20.74, CFN 1805672.~|~04 - Reconstruction - No Added Capacity~|~1B3A063ED57F8F66BBEEE80389407B72D365339B 90362~|~1~|~2~|~02/STR~|~Culvert Replacement HUR-162-8.72~|~44 - Other~|~4AD09E3D1055FDB371D669A6E021A60849272788 90362~|~1~|~1~|~01/S<2~|~Culvert Relining HUR-61-15.93~|~44 - Other~|~B1F2B0B8FA05F144D8C63D977CD1700B23C965BA 94784~|~1~|~1~|~01/CMQ~|~Construct 2 missing trail links on the existing 96 mile trail from Cincinnati to Urbana.~|~~|~729D8031722CA090BFE7AAFCFEF83F49119297A1 114467~|~1~|~1~|~01/NHS~|~Resurfacing SR 151~|~05 - 4R Maintenance - Resurfacing~|~A39505A843E265F24F059CC17D8ABEC13058BF08 115915~|~1~|~1~|~01/ENH/MIL~|~Construction Split 100% Local for Multiuse Path/Pedestrian Improvements.~|~28 - Facilities for Pedestrians & Bicycles~|~40E11EF8260F983BB9B350359177CE66AB361E9D 114526~|~1~|~1~|~01/STR~|~Double micro on LAW 141~|~05 - 4R Maintenance - Resurfacing~|~E80B79B1DA24FE6DFF1BBF461E6BA1411F597577 114526~|~1~|~2~|~02/STR~|~Bridge Preventative Maintenance~|~47 - Bridge Preventive Maintenance~|~98CD22E45369A89A7ED9EF52398A60E8EF003964 110214~|~1~|~1~|~01/SAE~|~Install flashing yellow arrow signals and equipment on the corridor of SR-747 from Devitt to Tylersville~|~21 - Safety~|~1A45DEDDCE6D215B9A9657E97C6B7283B86B8211 96485~|~1~|~1~|~01/SAF~|~Flat Sheet sign replacement project in FY2018. Various routes and sections in HOC and WAS counties. Funded 80 federal/20 state.~|~21 - Safety~|~9A1472DB27B88FE0102BA7CD2C10CB4416DBB895 97194~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation - 4PS7 (100% State) - No CAP - Collision Damage repairs on SFN 3001687, Gue-IR 70-16.55~|~~|~5E9E6054C7DC63263D1A7435B7F298B6DF75C613 110388~|~1~|~1~|~01/NHS~|~Improve intersection of FRA Broad (SR 16) at James Rd~|~21 - Safety~|~150B913A418432DF5819A8DF779D7CF7A26BF973 110388~|~1~|~2~|~02/SAF~|~Adding split for utility work~|~21 - Safety~|~D9CDEED0A9CAC20661EEAD5A3084378926EFA713 96263~|~1~|~1~|~01/SAF~|~This split uses federal Safe Routes to School funding and uses Toll Revenue Credit to bring the federal percentage to 100%.~|~28 - Facilities for Pedestrians & Bicycles~|~0CC90AAD50305BE7A073CFD0C42B808B196F2003 115099~|~1~|~1~|~01/S<2~|~Landslide repair by drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3E9C781B1373CA1669C2A8A6E1F49D46659E6CE3 84492~|~1~|~1~|~01/IMS~|~Resurfacing a portion of IR 275 in Hamilton County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~081912A5E3277B5A3CA4E4D43D6DD1EC44628833 84492~|~1~|~2~|~02/IMS~|~Minor rehab of 4 mainline twin bridges consisting of overlays, painting, barrier upgrades.~|~13 - Bridge Rehabilitation~|~C419C136409C381ECC7B889C3654FD4DF9411460 84492~|~1~|~3~|~03/IMS~|~Plan Split to cover the cost of the truss portions of the Combs Hehl Bridge over the Ohio River. Approach bridge work is paid for separately.~|~13 - Bridge Rehabilitation~|~435B7786F37FC0D23A591D72BA7788054E9F0F58 84492~|~1~|~4~|~04/IMS~|~Kentucky Approach Bridges. 100% KYTC responsibility.~|~13 - Bridge Rehabilitation~|~36CF53B564624E071369737C8AE4E2D3A9A8E885 84492~|~1~|~5~|~05/IMS~|~CCTV items~|~44 - Other~|~A63DE359995CD19CD1E1A76B87E3B8B3A083C252 84492~|~1~|~6~|~06/IMS~|~Waterway Permit Delay costs.~|~44 - Other~|~6C8C5BF2A5E1C7821626779FAFE7F747932D6B19 111083~|~1~|~1~|~01/SAF~|~Landslide debris spilled onto HAM-US 50 Columbia Parkway at 4 locations requiring the closure of the Parkway, the removal of the soil from the roadway and from on and above the retaining wall. A light pole was knocked over onto the pavement by the landslide. Four light poles were in jeopardy of being knocked over by the landslide and required removal. The largest of the landslide measures approximately 200 x 200 feet.~|~21 - Safety~|~719F6FE0881BE017D00DB7A837308AC1186D11CA 101692~|~1~|~3~|~03/NHS~|~NHS 100% City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~7229BCCA87AA56D1AF64C6AE0B978FC97A5198EA 101692~|~1~|~1~|~01/NHS~|~NHS 80/20 District Allocation/City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~AED0E0D57E41B144CEA0A5991D593D1F4A08D148 101692~|~1~|~2~|~02/S<2~|~STP < 200000 80/20 District Allocation/City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~60CA288DF2DF1294CBE1776E5368A5FD4AF94CF9 88854~|~1~|~1~|~01/NFP~|~This split is for state funds~|~99 - State Preventative Maintenance~|~B6ED1B70DDE2B3A5B358F27CA01574B77657EF2A 115612~|~1~|~2~|~02/NFP~|~Plan split for work using 100% local funds for waterline replacement and unwarranted signal removals.~|~05 - 4R Maintenance - Resurfacing~|~DBB529AE7365EC3AEA9A1F0F8602E826B47E8C0E 115612~|~1~|~1~|~01/ENH~|~Plan split for MPO fund eligible work including pedestrian & bicycle enhancements, ADA ramps, etc.~|~28 - Facilities for Pedestrians & Bicycles~|~92A73B21B82E7CFFEC970D2554593B2DF50365C1 92665~|~1~|~1~|~01/MPO~|~Resurfacing CR 509 2.19 - 2.97~|~05 - 4R Maintenance - Resurfacing~|~69CB0443A3C2A4F99DF1DFE78F14DC3355FC0D31 99994~|~1~|~1~|~01/IMS~|~90/10 federal/state plan split for all work.~|~47 - Bridge Preventive Maintenance~|~CDFB86565B8BE3EFB2428B91F95DD000B88C651A 98776~|~1~|~2~|~02/ENH~|~Replacement of existing sidewalk and installation of new sidewalk along Cincinnati Dayton Road between Lesourdsville West Chester Road/Station Road and the IR-75 NB on-ramp.~|~~|~460093235037695BB1A0811F1A70E0BFD51951ED 98776~|~1~|~1~|~01/S<2~|~Widening of Cincinnati Dayton Road to provide an additional center turn lane and southbound thru-lane between Lesourdsville West Chester/Station Road and the IR-75 NB on-ramp.~|~~|~BCD6FC6DA40419C04F9193CB5F0D6449A9F7743A 107227~|~1~|~1~|~01/SAF~|~Guardrail installation/replacement project on various routes and sections in Gallia Co. CEAO funded using HSIP for FY2022. Funded 100% federal.~|~21 - Safety~|~84AF697B7D1910570DFFA38C7CCCD59E5F2CFE1C 116768~|~1~|~1~|~01/STR~|~This plan spilt is for work located outside the city of Van Wert in the rural area. Work is from SLM 0.00 to 7.01. State preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~D5E72B45129EF0B1624FB5763BDF2516A96287C1 116768~|~1~|~2~|~02/S5K~|~This plan spilt is for work located outside the city of Van Wert but in the urban area. Work is from SLM 7.01 to 7.33 on both sides, then on the left side from 7.33 to 7.53, then both sides from 7.53 to 7.79, then on the left side from 8.37 to 8.44. State preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~9B6AD99B982A4D639B07740EDAECB12A114DB2DC 116768~|~1~|~3~|~03/S5K/VAN~|~(80/20 Items) This plan spilt is for work located inside the city of Van Wert. Work is from SLM 7.33 to 7.53 on the right side of the road, then on both sides from 7.79 to 8.37, then on the right side from 8.37 to 8.44. State preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~DBA0551950DA507F2E7AD43B9D6589D6FD43B2F4 116768~|~1~|~4~|~04/S5K~|~(100% City Items) This plan spilt is for work located inside the city of Van Wert. Work is from SLM 7.33 to 7.53 on the right side of the road, then on both sides from 7.79 to 8.37, then on the right side from 8.37 to 8.44. State preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~A3EB633117544CE121DD63A6F945B6E29D558948 110572~|~1~|~1~|~01/S>2~|~2" mill and fill with asphalt concrete on: MIA US 36 SLM 11.56 to 12.60~|~05 - 4R Maintenance - Resurfacing~|~AF050597F67B07E28E56C6DE6F8C9BB52F668491 110572~|~1~|~2~|~02/S<2~|~Full Depth replacement of aggregate base, base pavement, and subgrade compaction on US 36 from 11.67 to 11.85~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CFF6745D5EB95E8C25E4BD2C364E3E800FE8E6A8 110572~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~486BA35983158BFE65ED6473B23C2DA285FDFB43 108491~|~1~|~1~|~01/S<2~|~Slide repair PIK 551 2.06~|~04 - Reconstruction - No Added Capacity~|~5B2907F4E1BEB73171924292B4B5A85B8DEFF2A7 96530~|~1~|~1~|~01/IMS~|~Generic Plan Split for Cosntruction Inspection FY2019/2020 (A)~|~17 - Construction Engineering~|~0EFBDF1BC616511145EA54240BFBBD8B604D614B 110872~|~1~|~1~|~01/NHS~|~Bridge painting on US 30 bridges. US 30 is on the NHS. Federal and state funds from the District Preservation Program budget.~|~47 - Bridge Preventive Maintenance~|~D24D0CAA9005BC35E52F93240D7F8EC793CE2FF2 114768~|~1~|~1~|~01/SAF~|~Guardrail upgrades/replacements on various county routes throughout Trumbull County.~|~21 - Safety~|~1EC1868D2B2ECD009E25EE734D574A8D66797567 110385~|~1~|~1~|~01/S<2~|~UNI-33I-0.00 to 0.51; CR 133 (NW Parkway) to Marysville Corp~|~05 - 4R Maintenance - Resurfacing~|~8FEA8004DB0CDB477DD4B50D352F01A0DEDD0073 110385~|~1~|~2~|~02/NHS~|~Items associated with work on the US 33 Bridges~|~47 - Bridge Preventive Maintenance~|~AEC0722F12C7C1AD0AB15D99F5BFD3F04250E78C 88781~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~C0D181C4D0B64C5595966C4A7933C3FC73159746 88781~|~1~|~2~|~02/S>2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~5AEA44F8C072AEBC214A38881E326BC8907AE7C4 98597~|~1~|~1~|~01/STR~|~Replace small culvert CLE-133-3149, pave inverts for WAR-123-0999 and WAR-123-1023.~|~44 - Other~|~938C4E1F6E526179BA96359971DE9F794801FB47 98597~|~1~|~3~|~03/NHS~|~Pave invert small culvert WAR-122-0412.~|~44 - Other~|~AC29BE9F50AA173609E5FEEFF352DEE403657321 98597~|~1~|~2~|~02/S>2~|~Pave invert for CLE-132-0117.~|~44 - Other~|~ACD5D6A0B7D91102D7A3A5B446598877D5F77D6C 116843~|~1~|~1~|~01/S5K/LANC~|~"01/S5K/PV/LANC" - See CAP Comments - resurfacing and related roadway work items.~|~05 - 4R Maintenance - Resurfacing~|~86004E315C9F927F94FC309FDD13C4CCED1CFA98 110541~|~1~|~1~|~01/NHS~|~plan split for the median repair~|~21 - Safety~|~EF0C908AB4779134840FACD1409B2877B1750A7D 98748~|~1~|~1~|~01/BRO~|~"01/BRO/BR/FCEO" CEAO Funded project for replacement of deficient bridge for Fairfield County" w/ federal max of $892,430~|~13 - Bridge Rehabilitation~|~422A80740CF2E637100F96622499A7272935E576 97019~|~1~|~1~|~01/NFP~|~4805909, 4805917 6201628~|~44 - Other~|~A6220A2C6FF6202AE31DB0F95EF29DF173090FD0 119256~|~1~|~1~|~01/STR~|~Highway Lighting~|~21 - Safety~|~DE3188B64BD1CBB006E2B0A28CFB0D42257C1216 83634~|~1~|~5~|~05/STR~|~Replace culvert 280870661 in the rural area.~|~05 - 4R Maintenance - Resurfacing~|~0385387A2F642D7D11801270D3BB2DE64B6CEB53 83634~|~1~|~3~|~03/STR~|~Plan split for items of work for the new turn lane. Per Resolution 13-171, Geauga Co. participation is capped $50k.~|~05 - 4R Maintenance - Resurfacing~|~39418482672891A7CBF3AF59C71FAB5C33298842 83634~|~1~|~4~|~04/S>2~|~Replace culverts 280870387 and 280870504 in the urban area.~|~05 - 4R Maintenance - Resurfacing~|~711CBF5AAA122298E2D2A40D2EC75D9CC3666F3D 83634~|~1~|~2~|~02/STR~|~80/20 fund split using federal RURAL STP funds from SLM 6.20 to SLM 7.70. West of SLM 6.20 is URBAN STP.~|~05 - 4R Maintenance - Resurfacing~|~8647AB722C02F6D77DD392C0DFCC1388F82E80BF 83634~|~1~|~1~|~01/S>2~|~80/20 fund split using federal URBAN STP funds from SLM 2.73 to SLM 6.20. East of SLM 6.20 is RURAL STP.~|~05 - 4R Maintenance - Resurfacing~|~C927EF2B8F191ADE50F229FBAA936746A1D880CA 98676~|~1~|~1~|~01/SAF~|~Place centerline, edge line & other pavement markings on various routes in MER Co.~|~21 - Safety~|~64223F45220689A1F536CFE1BB3C6A24FCB21D21 98256~|~1~|~1~|~01/STR~|~Reactive Pavement Maintenance/GAP Project.~|~44 - Other~|~D21EB3FE3A74EA235A167337E84C6393724C2EB6 98256~|~1~|~2~|~02/S<2~|~Reactive Pavement Maintenance/GAP Project~|~44 - Other~|~CB8C5CD337D25C63E082CA76A723A032A69E3067 85101~|~1~|~1~|~01/STR~|~Resurfacing a portion of US 127 & SR 744 in Preble County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~05 - 4R Maintenance - Resurfacing~|~1CDD5BBEF381FEFC3D3A11359D99AF660F153556 114778~|~1~|~1~|~01/NFP~|~Const inspection~|~17 - Construction Engineering~|~058E727EC24018169244281A0A489922C5A0616E 93564~|~1~|~1~|~01/SAE~|~At the intersection of Reynolds Rd and Central Ave (US-20-10.65).~|~21 - Safety~|~1FF849B4F2F84F4ACAD55A13B91A753C7EC8BBF6 107794~|~1~|~1~|~01/MPO~|~Resurfacing CR 50 from 0.00 to 2.85 in the City of New Franklin.~|~05 - 4R Maintenance - Resurfacing~|~71B02ED94E964FEFC30F06A2941CB75A675A423C 88571~|~1~|~2~|~02/STR~|~Overlay US 68 with asphalt concreteUSR 68 SLM 11.43 to 20.26~|~05 - 4R Maintenance - Resurfacing~|~113BBE34821911229A47395A21F1C0787BC40AC5 88571~|~1~|~1~|~01/NHS~|~Overlay US 33 & US 68 with asphalt concreteUSR 33 SLM 6.57 to 10.74USR 68 SLM 0.00 to 2.29~|~05 - 4R Maintenance - Resurfacing~|~AED842117F1FB6597D24471776E86700952A7F3E 124341~|~1~|~1~|~01/NFA~|~All work included in this plan split.~|~~|~C18B9B982AEEA85ECDF7E7FF5B09F15EE1B59E61 112411~|~1~|~1~|~01/NFP~|~Cracksealing plan split~|~99 - State Preventative Maintenance~|~6F843031AFC883B41BFB31A5110F563597A2EEC3 112459~|~1~|~1~|~01/BRF/COL~|~OBPP replacement of SFN 1531344, utilizing 100% federal funds (up to max of $675,714)~|~10 - Bridge Replacement~|~4240B7B856A26AD9969DA45EE9014CB44D5D177C 98816~|~1~|~1~|~01/IMS~|~Split for lighting upgrade~|~44 - Other~|~B81A98EA22459143762CA9F0A4691C5C6B3020B6 91072~|~1~|~1~|~01/NHS~|~SEN US224 14.77-19.83~|~05 - 4R Maintenance - Resurfacing~|~AECAFEDB505B1DCCA1CF4F4377DD5E1BE40801D2 98123~|~1~|~1~|~01/ENH~|~Extension of streetscape improvements being performed under PID 88317, on Dayton Xenia Road between Ken Klare Drive and West Lynn Drive. Enhancements include installation of brick pavers, decorative lighting, and minor landscaping.~|~31 - Landscaping & Other Scenic Beautification~|~2382B5522CD81D20CB5E7B166014C5478FEB4531 105741~|~1~|~1~|~01/MPO~|~Plan Split 1 for federally eligible items~|~13 - Bridge Rehabilitation~|~AE7C054708DFB30C077EE4D35C6E1445B7ADB417 97958~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~26D35B789D93BB363E83718BC19211AA4E29CB99 109854~|~1~|~1~|~01/NFP~|~Culverts~|~04 - Reconstruction - No Added Capacity~|~D3D741BB02C1B34FEBC5824F2D57EC61DD70843E 90634~|~1~|~1~|~01/NFP~|~This is a mowing contract using maintenance operating funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7DD695B42C3A68A6232972019C07900163ACA3E2 114833~|~1~|~1~|~01/IMS~|~FRA-70 pavement plan split~|~05 - 4R Maintenance - Resurfacing~|~9C4C79B12DAEE6432D11360ECE9663F5ED5B5A9F 113127~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment.~|~21 - Safety~|~A26DADC64A72503CFFC5EFD5AC397ED12A4A2326 112690~|~1~|~1~|~01/STR~|~Pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~F14CF98DD0F1597D7FA70A51F7C39A62F7AC1A33 113201~|~1~|~1~|~01/NHS~|~Deck replacement > 20' span.~|~13 - Bridge Rehabilitation~|~6E30DE685A89F07D63E664BAB186E1A6B0CF5FEC 113201~|~1~|~2~|~02/NHS~|~Sanitary sewer replacement on SR 91 bridge paid by DSSS.~|~43 - Utilities~|~56EB5AD0C315BBE03254F728F923A7AB7FC62988 113201~|~1~|~3~|~03/NHS~|~Gas line replacement work on SR 91 bridge paid by Enbridge.~|~43 - Utilities~|~A5887112E9A291D2678A62EFA2DA143B64200F3E 92016~|~1~|~1~|~01/NHS~|~Bridge Work:ERI-SR-2 19.040 SFN (2201046) R HURON RIVER/N&S RR/CH-126 Preventive Maintenance ? Expansion joint repair/replacement (048) ? Deck Sealing (051) ? Bridge railing upgrade/repair (061) ? Channel drift removal (081) ? Substructure Sealing (088) Reactive Maintenance ? Backwall repl/repair (029) Minor Rehabilitation ? Conc patching (non-deck) (010) ? Superstructure (other) (039) ? Pile encasement (084) ? Approach slab repl/repair (100) ERI-SR-2 19.040 SFN (2201038) L HURON RIVER/N&S RR/CH-126 Preventive Maintenance ? Expansion joint repair/replacement (048) ? Deck Sealing (051) ? Bridge railing upgrade/repair (061) ? Channel drift removal (081) ? Substructure Sealing (088) Reactive Maintenance ? Backwall repl/repair (029) Minor Rehabilitation ? Conc patching (non-deck) (010) ? Superstructure (other) (039) ? Pile encasement (084) ? Approach slab repl/repair (100) ~|~13 - Bridge Rehabilitation~|~350D50ECDC34D2D40E9CBC82C034E518B2E0D7E5 121710~|~1~|~1~|~01/BRF~|~Bridge replacement utilizing CEAO LBR Federal funds at 95% (including 15% credit bridge) up to the Federal maximum.~|~10 - Bridge Replacement~|~22BCE161B6AAFDD15B23F8A6A4F9CC504890989D 84626~|~1~|~1~|~01/STR~|~Resurfacing ProjectSCI SR140 6.03 - 7.28 & 7.80 - 16.60 LAW-SR-140 0.000 to 1.68Brdgs pave thru.4402049 LAW SR140 0.82 Intersect: Hales Creek7304331 SCI SR140 7.84 Intersect: Falls Creek7304366 SCI SR140 8.3 Intersect: Falls Creek7304471 SCI SR140 9.73 Intersect: StreamCO CC 01 pavement plan split added for rural portion. 80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~1176367059586F0AA2F8D3EAF69794FE5B326839 84626~|~1~|~2~|~02/S<2~|~SCI SR140 Urban Brdg rehabCO CC 02 Brdgs plan split added for urban portion. 7304064 SCI SR140 2.48 Intersect: Wards Run7304099 SCI SR140 3.22 Intersect: Wards Run80/20 split02/S<2/BR/State~|~13 - Bridge Rehabilitation~|~7B127E84FD0CB4EFB2EC999E37D3EDD18DEFABE5 84626~|~1~|~3~|~03/S<2~|~Resurfacing Project.SCI SR140 0.42 - 6.03Pave thru brdgs.7303025 SCI SR140 4.07 Intersect: Dry Run7304021 SCI SR140 1.65 Intersect: Oven Lick7304153 SCI SR140 3.97 Intersect: Dry Run Creek7304269 SCI SR140 5.04 Intersect: Stream80/20 split03/S<2/PV/State~|~05 - 4R Maintenance - Resurfacing~|~CBED5ABEAD27009C21A25F5CAEFEE47E68888A39 84626~|~1~|~4~|~04/STR~|~Brdg plan splits rural. Covers brdgs :7304382 SCI SR140 8.52 Intersect: Frederick Creek7304501 SCI SR140 12.39 Intersect: Sugar Camp Creek7304544 SCI SR140 12.98 Intersect: Bloom Furnace Stream7304595 SCI SR140 15.07 Intersect: Jacksons Fork7304412 SCI SR140 9.22 Intersect: Stream7304447 SCI SR140 9.48 Intersect: Stream80/20 split04/STR/BR/State~|~13 - Bridge Rehabilitation~|~E540F39457DA35C177D51C113BD13A82C8EE354C 104665~|~1~|~1~|~01/NFP~|~Bridge repair plan split~|~13 - Bridge Rehabilitation~|~8C8708055FB0B03E8FADFB8E9007E561B9C62A1B 124363~|~1~|~1~|~01/NFA/FRED~|~Streetscape project for revitalization of downtown in Village of Fredericktown.~|~28 - Facilities for Pedestrians & Bicycles~|~3EDC4BD65D9A8F307F7157E1DC99854184B3F067 99572~|~1~|~1~|~01/SAE~|~Upgrading existing pavement markings on various Huron County roads.~|~21 - Safety~|~80E75FA2C59F4679BA0F03B1EFF906AAB41BBC10 115994~|~1~|~1~|~01/NHS~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A9506D467ACA5488F703F796CECA4D2D93A40EDA 108935~|~1~|~1~|~01/NHS~|~FY2022 Urban Paving in the City of Middletown on SR 4. This plan split is the 80% ODOT and 20% City items on the Urban Portion of SR 4.~|~05 - 4R Maintenance - Resurfacing~|~048CDEE90F5861512DDC05B6F128807D84DA238F 108935~|~1~|~2~|~02/NHS/MIDD~|~FY2022 Urban Paving in the City of Middletown on SR 4. This plan split is the 100% City items on the Urban Portion on SR 4.~|~05 - 4R Maintenance - Resurfacing~|~C07CD460E250FE149D758F9137CD6C034ED0A076 108935~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~3000226FC0155BA231B65DF5D7D2B524A6C84D5F 92921~|~1~|~1~|~01/NFA~|~Salt Shed @ Wilgus Outpost. 100% state,4MA7 facilities. 01/NFA/OT/State~|~44 - Other~|~3C312155C886C0B67456DFBAB62BB7EDC5F3C769 114091~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~61E34AB1256725E4248E19CCEE8EF761017C8068 95171~|~1~|~1~|~01/SAF/MCEO~|~County Engineer's Association Highway Safety Improvement Program (HSIP) Funding - 4HB7 (100% Federal) - See CAP Comment - Muskingum County Wide Pavement Marking of various County Roads.~|~21 - Safety~|~FA809DBF453FD701783D9069F7A75F5DB4CD396B 121328~|~1~|~1~|~01/NHS~|~Rural Population < 5,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~1848556E648044878234B389D27A2BCDD8730F8D 121328~|~1~|~2~|~02/NHS~|~NHS Fraklin County Population >200K Split~|~05 - 4R Maintenance - Resurfacing~|~8B9955D6D44D95EF0D5C88D473E3FC6E6350B226 121328~|~1~|~3~|~03/S>2~|~STP >200,000 Split~|~05 - 4R Maintenance - Resurfacing~|~7D149504EAC12DBE8AEF6EF8B35BC25B48CB5363 121328~|~1~|~4~|~04/S5K~|~STP >5 Split~|~05 - 4R Maintenance - Resurfacing~|~50D481072597AE0B50967B055FBBDD1D0F4CD519 121328~|~1~|~5~|~05/STR~|~STP Rural Split~|~05 - 4R Maintenance - Resurfacing~|~56DBB6CC6FF1951253272E2E310B19CD9EDE7AD3 121218~|~1~|~1~|~01/MPO/BEAV~|~MVRPC carbon reduction program funded construction of a sidewalk and shared use path in the City of Beavercreek.~|~28 - Facilities for Pedestrians & Bicycles~|~5B2E7898658DFBF6C61F8969879B81E5EE7AAD88 121218~|~1~|~2~|~02/NFA/BEAV~|~100% locally funded work on sidewalk at the southern end of the project. West side of Grange Hall road to Kensington Glen.~|~28 - Facilities for Pedestrians & Bicycles~|~798549B069572717FC8E7DE78B6012EF411DC110 81543~|~1~|~1~|~01/ERD~|~ New access road to service Center for Business and Education Park in Yellow Springs on East Enon Road .30 mi. north of Dayton Yellow-Springs to Dayto YS at .36 mi. west of East Enon Rd.~|~~|~B9AAB36A53F74C0016BCC8F33D6277F7240A5E6E 117908~|~1~|~1~|~01/NFA~|~NEVI Phase 1, I-70-F, BEL 208-225~|~63 - Electric Vehicles & Charging Infrastructure~|~03F84BB8BED557ECC36A8E59973D7FAAF9560659 108861~|~1~|~1~|~01/SAF~|~All work is in this split.~|~21 - Safety~|~95935198AFF1A3D785EBBAAD0D994A8568CC9000 100569~|~1~|~1~|~01/S>2~|~Resurfacing TUS-36 with microsurfacing including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~693CF33916EFF81508162B3EC549797F4261DEE9 100569~|~1~|~2~|~02/NHS~|~Resurfacing TUS-36 from CR 62 to TUS-250 and TUS-250 from TUS-36 to HAS Co. Line, including microsurfacing, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~D49C67D36627B3AB6787667F76B38BCEA6A23597 91157~|~1~|~1~|~01/NHS~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in Villages at various locations in D10. Federal 80% and State 20%.~|~21 - Safety~|~6920FCCB084F04232E86E7DF7A91E8494F0C7644 91157~|~1~|~2~|~02/STR~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in Villages at various locations in D10. Rural Federal 80% and State 20%.~|~21 - Safety~|~9A4BA6FC7026D5FB3A896155BDB92A7520B1DFB0 91157~|~1~|~3~|~03/S<2~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc..in Villages at various locations in D10. Urban Federal 80% and State 20%.~|~21 - Safety~|~D39AC2B8A648BAC5CDD2AE005C2BA6D01AF0DCA7 103435~|~1~|~2~|~02/SAE~|~Work funded by the safety program. 100% state funds SAC 4BC7.~|~99 - State Preventative Maintenance~|~1D1B004BDDBEFDF16703CC3A80352E3D3833CA1D 103435~|~1~|~1~|~01/NFP~|~Work funded with 100% state funds from the District Preservation Program SAC 4PS7.~|~99 - State Preventative Maintenance~|~431FC1230690E5166123CC477B0E593583D4B330 111425~|~1~|~1~|~01/S<2~|~Asphalt resurfacing of Front Street in City of Marietta. WAS Front Street (CR 2001) 0.33-1.05. 80% Federal and 20% Local funds.~|~05 - 4R Maintenance - Resurfacing~|~1245F4E8A53E9B2761B4FBFBE2F196F87813FC09 117789~|~1~|~1~|~01/NFP~|~Reconstruction of the Rest Area Parking lot, sidewalks, ADA ramps and other miscellaneous items~|~17 - Construction Engineering~|~890556234CAB22DACF85D1824BBD0DD40A8A02B7 124155~|~1~|~1~|~01/BRO~|~Bridge work for bridge on eligible system~|~10 - Bridge Replacement~|~882E257C369425DDF68582578A32F1F35A18294B 110150~|~1~|~1~|~01/STR~|~Replace culvert at MRW-42-22,69~|~04 - Reconstruction - No Added Capacity~|~F6AA30637929DC9FDC97A299B4E5A22ECBA25B03 92713~|~1~|~1~|~01/MPO~|~Resurfacing CR 654 3.42 - 4.78~|~05 - 4R Maintenance - Resurfacing~|~0C007E4E29DB8F754EDF3B1D764219CD1AFA7EC4 108318~|~1~|~1~|~01/NFP~|~Expansion joint armor repair~|~47 - Bridge Preventive Maintenance~|~EDA89FB5A1BC18AFF5DC1EA05DB64870E70DDC89 102370~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. NOB 821 0.00-7.49 and WAS 821 11.73-20.77. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B592BEDE3C738F5B77896469562DFFE8746A9095 105384~|~1~|~1~|~01/NHS~|~Smooth seal on NHS route: AUG US 33 SLM 23.07 to 29.20~|~05 - 4R Maintenance - Resurfacing~|~486A6BF48A1F9511C9CB47BC598BB02D2874AF0B 105384~|~1~|~2~|~02/STR~|~Smooth seal on rural route: AUG SR 29 SLM 6.40 to 9.67~|~05 - 4R Maintenance - Resurfacing~|~24A5729C79166DFDA72F89D2E38A2761DCC4469F 105384~|~1~|~3~|~03/S<2~|~Smooth seal on small urban routes: SUG SR 29 SLM 5.31 to 6.40~|~05 - 4R Maintenance - Resurfacing~|~83417942276B6850E3DE6CFD5D15E516576EB060 94317~|~1~|~1~|~01/S5K~|~Resurfacing along US 22 and SR 723. ~|~05 - 4R Maintenance - Resurfacing~|~25B45B797E76916830E01556CB04712A206971C3 94317~|~1~|~2~|~02/S5K/CAMB~|~Resurfacing along US 22 in the City of Cambridge.~|~05 - 4R Maintenance - Resurfacing~|~E0F315023AFC20E635B7BDFE7AD13D0B0801D3F9 115989~|~1~|~1~|~01/NFA~|~Slope repair/stabilization~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~37B1A52D09A09AD014DD8DCECADBCBF4CA96CFC6 85115~|~1~|~1~|~01/IMS~|~Deck overlay bridge repairs with minimal approach work on SFN 5704715 MOT 75 0295 L and SFN 5704774 MOT 75 0295 R.~|~13 - Bridge Rehabilitation~|~B7EC92C09272C6D23F96770D3BFC56C8D363B651 75940~|~1~|~2~|~02/NHS~|~Do pavement marking and replace RPM's on current project at various locations on MOT US 35 from 13.85 to 15.07.~|~44 - Other~|~98551436F6AC9824B728D933C8EF92FBB510E46A 75940~|~1~|~1~|~01/NHS~|~JOINT REPAIR AND DIAMOND GRINDING in Dayton from Dearborn/Abbey to the junction of IR 75.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BCFC09A6880ACE1C80B23798BF95C5C4BFA99ABB 97740~|~1~|~1~|~01/BRO~|~Bridge replacement project. WAS 339 12.01, SFN 8404178. Bridge on system eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~65D057E40E06843B5BCF5084C9A2076BCE12E466 113039~|~1~|~1~|~01/NHS/HUBB~|~Resurfacing, urban paving in the City of Hubbard.~|~05 - 4R Maintenance - Resurfacing~|~58488C6BAF9C715F1D229026F3FBFDA83F8E6A7B 113039~|~1~|~2~|~02/S>2/HUBB~|~Resurfacing, urban paving in the City of Hubbard.~|~05 - 4R Maintenance - Resurfacing~|~D8801EE506AA2EEA8EE6BFC02D70F1E1CDFD572F 113039~|~1~|~3~|~03/NHS/HUBB~|~Full and partial depth pavement repairs and curb ramp replacements.~|~04 - Reconstruction - No Added Capacity~|~29CFC2B58065A01ABD53FF266CB0E1C8A233E83D 95570~|~1~|~1~|~01/MPO/Cols~|~Replace SFN 2516446~|~10 - Bridge Replacement~|~5B7F57F66449A4A2406D5B84525A0F25B5855758 95570~|~1~|~2~|~02/MPO/Cols~|~Safety improvements on S. Hamilton Road (SR 317) from Refugee Road to 550 feet north of Groves Road~|~21 - Safety~|~7D2FD56268A124E4AB2C489AA8AF799416A0CFEC 106155~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 1.11. DSR MRG-003. Rural other federal aid funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD5D79EEEB5A7F1BA8168D2E49D448DF749FE093 99087~|~1~|~1~|~01/NHS~|~The installation of a traffic signal and increasing the capacity of the northbound approach.~|~21 - Safety~|~01F6EBBCAD4F0A4251C7DA8882B004637E6ACB51 91939~|~1~|~2~|~02/IMS~|~Rehabilitate Bridge HAM-50-2180N by repairing gusset plates with pack rust at several locations and spot painting at isolated critical locations to arrest packrust. Other minor rehabilitation items may be addded.~|~13 - Bridge Rehabilitation~|~6C91E0D93363C17F8EC56FF80688A91D4E5CE600 91939~|~1~|~1~|~01/NHS~|~Rehabilitate Bridge HAM-50-0376L (SFN 3102521) by replacing gusset plate rivets with bolts for members L4/L6 in Spans 2 and Span 3. Perform spot painting at isolated critical locations to arrest pack rust development.~|~13 - Bridge Rehabilitation~|~9EC7705DEDA1F1EF08765D298B2C163460D030BF 82910~|~1~|~1~|~01/S>2~|~SR91 0.00-0.19 & 5.01-5.12 & 5.52-6.19~|~~|~78F7D2EC95B94E24B268320001501E2595A64DBF 107877~|~1~|~1~|~01/STR~|~District preservation funds.~|~05 - 4R Maintenance - Resurfacing~|~B356D3C27EE4844058B20492B8636F8750360875 113302~|~1~|~2~|~02/MPO/HAM~|~Plan split for improvements at signalized intersections that do not meet a warrant.~|~21 - Safety~|~4597C0DC7BF8F625322CA7812F21BA970E489F16 113302~|~1~|~1~|~01/MPO~|~The purpose of the City of Hamilton?s signal project is to upgrade the traffic signal system to a central based signal system, upgrade traffic signal controllers, and detection, and improve communication between the signals using fiber optic.~|~21 - Safety~|~5ED13DECA1821D64BB0E90CA1281EF1ACEA7B4E8 109186~|~1~|~1~|~01/S>2~|~Install reinforced soil slope along southbound SR 674~|~~|~79FBA429F70B955462AF16A512DF7F25B55EBFD6 114257~|~1~|~1~|~01/NFP~|~Miscellaneous CE charges~|~17 - Construction Engineering~|~74FD777BFBADDC3E149AE8CD09B0E1BF6583C2F8 122984~|~1~|~1~|~01/MPO~|~Plan Split for federally eligible construction items~|~04 - Reconstruction - No Added Capacity~|~5265987B2194B84584778D790DC8AF1508D458C4 122984~|~1~|~2~|~02/SAF~|~Plan split for safety funds added to protect Vulnerable Road Users. See C. Whitaker email dated 1/13/2026~|~21 - Safety~|~F7D2902D8BAC90B25A6DB849D0C431304291BB87 86726~|~1~|~2~|~02/STR~|~Bridge Work - WAY-094-13.37 sfn:8504024~|~13 - Bridge Rehabilitation~|~64B5E2333BF83B41C072DE4FC0DCF29BB389A87E 86726~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~AF1A12FB6C54CE8182B505F9B83BD6756994BD2B 122968~|~1~|~1~|~01/CMQ~|~Plan split for construction of a shared-use path and bus shelter.~|~28 - Facilities for Pedestrians & Bicycles~|~47426FABA4299B492B9E16B89C46CB056250C6F7 88689~|~1~|~2~|~02/NFA~|~Microsurface the existing roadways as Preventative Maintenance CHP 560 SLM 2.76 to 9.94 (ZR 000)~|~05 - 4R Maintenance - Resurfacing~|~1A3163801DB82CD9016D5F158AE0248F10AFD9A9 88689~|~1~|~1~|~01/STR~|~Microsurface the existing roadways as Preventative Maintenance on DAR SR 47 SLM 13.89 to 18.37 SHE SR 29 SLM 7.64 to 14.55 CHP 560 SLM 0.00 to 2.76 (OC 000)~|~05 - 4R Maintenance - Resurfacing~|~29ED2B1B09D7792557E9B2B5352D48204BD11BD6 88689~|~1~|~3~|~03/S>2~|~Microsurface the existing roadways (Preventive Maintenance) MIA SR 718 SLM 8.35 to SLM 10.14.~|~05 - 4R Maintenance - Resurfacing~|~87614EBD996CB134A948339E9BE8359B0D7AB3D7 111998~|~1~|~1~|~01/NHS~|~Repair slips/slides along TRU SR 5 embankment.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~88A58DC39672224AACD40881C975BAF385C43F81 99645~|~1~|~1~|~01/STR~|~Work on the rural STP portion from SLM 0.00 to 3.13 at 80/20 fed/state.~|~05 - 4R Maintenance - Resurfacing~|~25DDC674AAC47567A5E99F557F28AB7661B56FEB 99645~|~1~|~3~|~03/NHS~|~Work on the NHS portion from SLM 3.19 to 6.32 at 80/20 fed/state.~|~05 - 4R Maintenance - Resurfacing~|~789A61022317466CA02C7B83DFBC9A14C3F7E8D5 99645~|~1~|~2~|~02/S>2~|~Work on the urban STP portion from SLM 3.13 to 3.19 at 80/20 fed/state.~|~05 - 4R Maintenance - Resurfacing~|~B562735B8DAB16436C595C84BEA0783D1B82B860 99645~|~1~|~4~|~04/STR~|~Split for work on 3 culverts~|~05 - 4R Maintenance - Resurfacing~|~829D324175773C6EC5FE34A79CC3E808D0CFE46E 99645~|~1~|~5~|~05/NFP~|~Split for 100% local items of work in Madison~|~~|~C97D90FFBA0DB28346736635E1D70FA83262C064 122516~|~1~|~1~|~01/NFP~|~ODNR plan split.~|~05 - 4R Maintenance - Resurfacing~|~E1D803BEC0F6DA3806280925EE73632FC60F0F8E 123945~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~CC7172E194404D01602079E7A1F551EB50BF8141 111411~|~1~|~1~|~01/STR~|~Culvert replacement project on VIN 677 3.02 (CFN 1811104) and VIN 677 3.21 (CFN 1811105). Rural other federal aid funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~EFD299BC54FBD64D364FF8D28839C7A4FE2F3854 87703~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~99 - State Preventative Maintenance~|~4964F2CED08806D48F3081FD954A6A0D738612BB 126110~|~1~|~1~|~01/NHS~|~Plan split for the NHS location~|~20 - Environmental Only~|~03C5E7462ECFE466C51206B18176F082B8A03ACD 114984~|~1~|~1~|~01/STR~|~Pavement RPM's.~|~21 - Safety~|~627B080E2DE4B35F1F8D5D2518C95D8D71A0A535 110090~|~1~|~1~|~01/S>2~|~Culvert repair/replace on Lrg. Urban routes.~|~04 - Reconstruction - No Added Capacity~|~C96907CEF4897993CBEC7969E6D69C15006E02D8 110090~|~1~|~2~|~02/NHS~|~Culvert repair/replace on NHS route.~|~04 - Reconstruction - No Added Capacity~|~A41EAD6CA35D80635D135A3D1FA8B624B52D342A 110090~|~1~|~3~|~03/STR~|~Culver repair/replace on rural route~|~04 - Reconstruction - No Added Capacity~|~76DACC77E73AB3C69CE77AE3A29A7BED724E02E9 126400~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~EC85A60E6ED3496766CC23568EA2463B020F4BB5 117220~|~1~|~1~|~01/SAF~|~Install sidewalk and pedestrian safety improvements along Kemper Rd~|~21 - Safety~|~C91A5DB2F9F15B12D0B06E3820F18224A65CF341 119271~|~1~|~1~|~01/IMS~|~Plan Split for interstate locations~|~21 - Safety~|~E6DC7C322466520DA0C0856D0227BAE82CD16896 119271~|~1~|~2~|~02/SAE~|~Add cantilever signs on SB US-27 approaching Struble Rd. ~|~21 - Safety~|~AFDE4639357A5FB9CA9588DE774D1FBFA98CC11C 111608~|~1~|~1~|~01/S>2~|~Urban Paving Plan Split for the City of Delaware.~|~05 - 4R Maintenance - Resurfacing~|~9BD4207C0DEE8341C63F9863BD7807C7F0674A96 111608~|~1~|~2~|~02/S>2~|~General system Paving Plan Split for resurfacing, repairs, striping, etc.~|~05 - 4R Maintenance - Resurfacing~|~FF33C474F5FDF0EC65FB0090B9DE31A09BF90D15 111608~|~1~|~3~|~03/S>2/Del~|~Items to be paid 100% by the City of Delaware~|~05 - 4R Maintenance - Resurfacing~|~FE8B1B4DD6BC2D02EB38531D63967BB94AD64960 90235~|~1~|~1~|~01/S<2~|~"01/S<2/OT/Steu" - At the intersection of Lovers Lane and Sunset Blvd (SR 43), provide modified lane configurations at the eastbound, northbound and southbound approaches. At the westbound approach, provide an increased turning radius. Rebuild existing traffic signal. Provide new curb, sidewalk and curb ramps.~|~21 - Safety~|~81CC31F50C64B76718EEFAC1CBEFA4DD305592D3 109840~|~1~|~1~|~01/S<2~|~Resurfacing in JAC.~|~05 - 4R Maintenance - Resurfacing~|~A0B9E1376EC81FD314329CB7DC13BE6D979E8076 109840~|~1~|~2~|~02/S<2~|~Local MatchResurfacing in JAC.~|~05 - 4R Maintenance - Resurfacing~|~F6A7AF97DE0942A71E7C3BE0D08CADE4999404B4 112854~|~1~|~1~|~01/NHS~|~D09 Chipseal FY27~|~05 - 4R Maintenance - Resurfacing~|~EC50F3F7C081AF033698B28B406EE9E1437734C0 104046~|~1~|~1~|~01/BRF/MCEO~|~Muskingum County Engineer's CEAO Bridge Funding - 4B87 (80% Federal) / 4B87 (15% Credit Bridge) / 4BG7 - See CAP Comments - Replacement of deficient Muskingum County Bridge utilizing CEAO funding.~|~10 - Bridge Replacement~|~4CD8731A34F0A668F43C8F4459EC53521B1509DD 112732~|~1~|~1~|~01/NHS~|~Structural Liner at DEL-257-3.58 and FAY-207-1.06. Concrete bottom at MRW-95-3.11~|~13 - Bridge Rehabilitation~|~6224E03759F6DE4983AE61F576D92DDA5D460F2E 116686~|~1~|~1~|~01/NHS~|~All work is in this plan split. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~54267BD6B7BDA276E3C2536E2E2F0EAF6F121765 98612~|~1~|~1~|~01/NFP~|~Construction of a noise wall along Ohio Turnpike near Jesse Drive, in the City of Hudson, Summit County, Ohio.~|~~|~6896BECF5AA409076578EE9F9380D29CB3396BC4 110055~|~1~|~1~|~01/STR~|~Rural Plan Split: MAR-257-0.00-0.35~|~05 - 4R Maintenance - Resurfacing~|~E77EA9ED65D089E5061F2A51A9D82AD2FE132E63 109285~|~1~|~1~|~01/STR~|~Work outside of the Van Wert Urban Area. All the work on CR 418 east of the Van Wert Urban Area Limits where the CR 418 leaves the City of Van Wert on the right side at 11.14 and all work on CR 173. Work includes resurfacing, striping, raised pavement markers and edge line rumble stripes.~|~05 - 4R Maintenance - Resurfacing~|~405954EA2BA0779E6ED46D1F9DD84E2CA7346A6C 109285~|~1~|~2~|~02/S<2~|~Work inside of the Van Wert Urban Area. Work is on CR 418 from the beginning of the project at Wayne Street to the Van Wert Urban Area boundary where CR 418 leaves the City of Van Wert on the right side at 11.14. Work includes resurfacing, striping. raised pavement markers and edge line rumble stripes.~|~05 - 4R Maintenance - Resurfacing~|~223EB528821FAD3437E646C118E950F81404ABDD 112840~|~1~|~1~|~01/NFA~|~Lima OP Truck Storage~|~01 - New Construction~|~FCE70538BEC9437B561CA11691692A66561D5D37 96607~|~1~|~2~|~02/S<2~|~Culvert replacement project. HOC 664 16.51 (CFN 376641651). Urban other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~6FB90A5A27C841DD577277CBCE522DD432DFA3D8 96607~|~1~|~1~|~01/STR~|~Culvert replacement project. HOC 180 6.27 (CFN 371800220), HOC 180 7.59 (CFN 371800290), HOC 180 9.51 (CFN 371800350), HOC 180 11.85 (CFN 371800440), HOC 180 14.36 (CFN 371800535), HOC 180 15.48 (CFN 371800575), HOC 180 15.91 (CFN 371800595), HOC 664 16.87 (CFN 376641687), HOC 664 21.36 (CFN 376640835), HOC 664 21.82 (CFN 376640865) and HOC 664 23.15 (CFN 376642315). Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~A00377E367C936F080D5D5673199CD61743CEAEC 96607~|~1~|~3~|~03/NFA~|~Culvert replacement project. HOC 374 20.13 (CFN 373740805), HOC 374 24.13 (CFN 373741050). Not on any federal aid system funded 100% state.~|~04 - Reconstruction - No Added Capacity~|~EE6AF9FEBA9F18FFAC5D143450C5DC09FB7A055C 110870~|~1~|~1~|~01/IMS~|~Bridge painting on interstate bridges. Federal and state funds from the District Preservation Program budget.~|~47 - Bridge Preventive Maintenance~|~420F31261DD8910B000E185BCD912908B48F8342 110870~|~1~|~2~|~02/STR~|~Bridge painting on the rural STP system. Federal and state funds from the District Preservation Program budget.~|~47 - Bridge Preventive Maintenance~|~7FEA25A8D7790BC47DF870EA475B90519596C5BB 117071~|~1~|~1~|~01/STR~|~Plan split for the rehabilitation and superstructure replacement of non-federal bridge~|~04 - Reconstruction - No Added Capacity~|~887FBBE279359AE7E10F7966073A64D2E41A9FCC 125989~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the center line, edge line, lane line and interchange pavement markings with fast dry paint on those routes in the Western MQS quadrants of the District.~|~21 - Safety~|~248C52A06E6A5878794750A4EE00501ACE68911B 119809~|~1~|~1~|~01/SAF~|~Reconstruction of Second Creek Rd (CR-19) in Clinton County to increase travel lane and shoulder widths, install rumble stripes, and remove roadside hazards.~|~21 - Safety~|~EDDF52497AAC2D66FCCAA3ADABA45863176F0C42 105430~|~1~|~2~|~02/IMS~|~Replace structure FRA 70 1301R (SFN 2504766)~|~10 - Bridge Replacement~|~ED2443C1C6345F9D5E5C5C801903A4074F22A48E 105430~|~1~|~1~|~01/IMS~|~Replace deck on structure FRA-70-1301L (SFN 2504677)~|~10 - Bridge Replacement~|~74E6E102F360CD75659929660F8A1915FF0F73C2 124058~|~1~|~1~|~01/SAF~|~Plan split for eligible safety items~|~21 - Safety~|~D48B63B39916CDAA988FE0B875928EC9877A1DFB 124078~|~1~|~1~|~01/IMS~|~Rehabilitation of superstructure SFN 3000990 along IR 70 in Guernsey County.~|~13 - Bridge Rehabilitation~|~392B1C7614864EB6A2A3DDEB0FCA120E472A728C 118837~|~1~|~1~|~01/SAF/STCE~|~Intersection improvements on Whipple Ave (CR 219) at 4th and 3rd streets.~|~04 - Reconstruction - No Added Capacity~|~588FE22791AA0F663FB1CF2EC991477024AA61EA 125794~|~1~|~1~|~01/CMQ/CUYF~|~Signal upgrade/replacement.~|~21 - Safety~|~220208B6D611273B79AEDAC1F653C8DB5CA3D861 112504~|~1~|~1~|~01/SAF~|~Traffic signal and pedestrian improvements from Scott Drive to Kienle Drive in the City of Piqua.~|~21 - Safety~|~1EB778AF89D6050BD3F9C642099565C9905331CC 115242~|~1~|~1~|~01/ENH~|~Construct sidewalks and corresponding ADA facilities (95% TAP Funds).~|~28 - Facilities for Pedestrians & Bicycles~|~521D6A882CE1C944560074AEAB7821C92E3718A6 115740~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~B553FE17C3E7398F5EDB55A9A7A93B40F9D4A1AB 104171~|~1~|~1~|~01/STR~|~Pavement repairs~|~05 - 4R Maintenance - Resurfacing~|~9FB16293CAAA09DA56B605AF12721215B5ABFD8D 103650~|~1~|~1~|~01/BRO~|~Rehabilitate bridge by replacing existing asphalt wearing surface with new asphalt wearing surface on prestressed concrete boxbeam bridge - TUS-416-0901 (SFN 7905998)~|~13 - Bridge Rehabilitation~|~CA9228CA4C0B00670C824957EA741DF00ECAB9B7 89135~|~1~|~1~|~01/BRF~|~6631037 PIK CR37 3.04 Intersect: Pee Pee Creek CEAO 80 Fed/20 Local Match Pike County 01/BRF/BR/Pike~|~10 - Bridge Replacement~|~92FEAF04602298B41FC0E3C7A6796CE8C224683A 94174~|~1~|~1~|~01/STR~|~Resurfacing GRE SR 72 SLM 14.48 to 19.01~|~05 - 4R Maintenance - Resurfacing~|~074F8188D66B6BF34157A8AE6D37B15FC24772A8 94174~|~1~|~2~|~02/STR~|~Bridge maintenance.~|~13 - Bridge Rehabilitation~|~34DC4EE9C9AB19E80173A38BD9D0C38AF58DC4F6 94174~|~1~|~3~|~03/SAF~|~Centerline rumble stripes~|~21 - Safety~|~314242DA6E553F650A3469FB652008BA88AF940D 100053~|~1~|~1~|~01/NFP~|~Building new outpost at ATB SR 11 Rest Area.~|~~|~4AE84DE8AD0C649FFC7ED9978D4F9F934C611CCD 103677~|~1~|~1~|~01/SAF/MCEO~|~"01/SAF/OT/MCEO" ODOT Safety - Pavement Marking 4HJ7(100% Federal) - CAP of $50,000.00 federal - Pavement Marking on identified routes~|~21 - Safety~|~100C9D26BF78249F5DC6BF32A3F721C2DC3D702B 84386~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on BEL-9-14.52 to 14.62; includes asphalt overlay, milling, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~0FC78D90591AF2966BB4F2DE4CF186F157463930 84386~|~1~|~1~|~01/STR~|~General System Minor Rehab. on BEL-9-0.00 to 14.52; includes asphalt overlay, milling, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~107BE85B13FC317B2CCDB011584504F8FC5885C0 107431~|~1~|~1~|~01/SAF~|~Safety improvements on County Road in Mercer County.~|~21 - Safety~|~0C9772D610255D789B6068472600DE2CC51AEA07 105187~|~1~|~1~|~01/NHS~|~Split for deck replacement on two structures~|~13 - Bridge Rehabilitation~|~B6B48B36F8760822392EE889F52D528DF61E140E 100888~|~1~|~1~|~01/NFA~|~LAW 775 14.36 (SFN4404777)~|~10 - Bridge Replacement~|~71FE6873FCBBC7FD82B48EB5DF9F0F2E345D1407 126182~|~1~|~1~|~01/MPO/CFAL~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3FABF5B9B85836158AACE7FF62348D72F77EE886 95295~|~1~|~1~|~01/NFP~|~Split~|~01 - New Construction~|~BD05038EB0373EF16E33C27D85CC6DD0A95DF2F9 118840~|~1~|~1~|~01/STR~|~Resurfacing SR 518~|~05 - 4R Maintenance - Resurfacing~|~55DF58A2B2B594ADB6F618AB9EDBCE117B018462 107441~|~1~|~1~|~01/STR~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~D20220408075BEEB995C42F578E9DAC39931425A 107441~|~1~|~2~|~02/NFA~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~EC385A02B8348DE44382BEC8AC8B7A02B6DFCBC4 111609~|~1~|~1~|~01/STR~|~Installation of drilled shaft wall for slope stabilization along SR 37 and Rush Creek.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~272060B56013E4A23A914FB65525B53AB69162C9 102824~|~1~|~1~|~01/STR~|~STP Rural pavement~|~05 - 4R Maintenance - Resurfacing~|~B241CAD07FEA991A526FBCFA8DE0B7428D657DB4 102824~|~1~|~2~|~02/STR~|~STP rural bridge~|~13 - Bridge Rehabilitation~|~38D53C791567CFA8B76C528BE0BE8912D13B7952 99711~|~1~|~1~|~01/NFP~|~Loop maintenance and repair along various routes throughout District Four.~|~44 - Other~|~87CBB653C2272B6554A2FF20D9032ED1DB28A743 88544~|~1~|~1~|~01/MPO~|~Plan Split for SUM Norton Road (TR 120) from 0.75 to 2.30~|~05 - 4R Maintenance - Resurfacing~|~DE5A524E8CB465E61A6EF0E731593D633FC62F5C 114499~|~1~|~1~|~01/S<2/TOR~|~Construction of bridge with 95% Municipal Bridge funds (4R87 includes 15% Toll Revenue Credit) and 5% Local funds (4BG7).~|~13 - Bridge Rehabilitation~|~4B3C114B56D923F84D6143724AF767F1A937183D 125964~|~1~|~1~|~01/BRO~|~Bridge rehabilitation. ~|~47 - Bridge Preventive Maintenance~|~C7322E5174D4E323C1BB57E0EE8B5DE928DCEDCA 115860~|~1~|~1~|~01/IMS~|~Split for BEL-70-10.11 conduit.~|~04 - Reconstruction - No Added Capacity~|~74A7AD1835575513273BEBBEC0DFDBC80643EEA1 123949~|~1~|~1~|~01/NFA/GCEO~|~Mill and Fill along CR 71 (Peoli Rd).~|~05 - 4R Maintenance - Resurfacing~|~3EE4D4CB6097F163DBFDEA8F4B5C1A7E7A5167B7 115845~|~1~|~1~|~01/S5K~|~Signal Maintenance project. Replacement of poles, signal heads, pavement loops, wiring, etc.~|~21 - Safety~|~AF295B0B8D8F84D241DA01637139EB1DE90AADC5 103028~|~1~|~1~|~01/NHS~|~Installing walkway/bikeway on north side of SR 18 between I-77 and Cleveland Massillon Road.~|~28 - Facilities for Pedestrians & Bicycles~|~9386C30D52B42442F01A1B2C5B3DEBB9567E8B4E 125642~|~1~|~1~|~01/SAF~|~Install a compact roundabout with lighting and improve pedestrian connectivity by filling sidewalk gaps and installing high-visibility crosswalks at Kimberly parkway North in Columbus~|~21 - Safety~|~239934B0C705CD2C96D483D7C3E10F11E711EE49 108095~|~1~|~1~|~01/IMS~|~Bridge repair on bridges over 20'.~|~13 - Bridge Rehabilitation~|~4399B8AC69C9BE43C1A17CB07774E54CD9C89BD3 108095~|~1~|~2~|~02/IMS~|~Bridge repair on bridges under 20'.~|~13 - Bridge Rehabilitation~|~0C0F61F0A15BCAA49ACE47BD48D17FD849150AAE 108095~|~1~|~3~|~03/STR~|~Bridge repair on rural route bridge~|~13 - Bridge Rehabilitation~|~590E3088410C5B060139F62FEBB8793757C0076F 108095~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~2516C537F78A9E2282F8769658797FEACE073BAB 103744~|~1~|~1~|~01/SAF~|~Plan Split 1~|~21 - Safety~|~3DAE77827EFF02BDE58E1BD014F2039B03383736 109708~|~1~|~1~|~01/STR~|~Chip seal on:CHP-54 SLM 0.00 to 1.70LOG-292 SLM 0.52 to 3.63MIA-201 SLM 9.16 to 12.51~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E877F0DE06577C0D4A9ECDE0C303ECE983D896B1 109708~|~1~|~2~|~02/S<2~|~Chip seal on:LOG-47 SLM 15.33 to 16.77~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5CDF220F62D8BD1BAADC924D96D5A9256B6C9018 91847~|~1~|~1~|~01/STR~|~General System Minor Rehab.of TUS-39-2.94 to 7.14; includes rigid repairs, 3 in. asphalt overlay, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~6329533CA1B360D820A2466284A8C0CDAED6141D 106622~|~1~|~1~|~01/SAF~|~Install turn lanes at SR 183 and upgrade signal.~|~21 - Safety~|~C451F7D788E2A03CCC129B59EC835313FC4E2F79 97436~|~1~|~1~|~01/S<2~|~This split is for all resurfacing work on CR434. This split uses 80% Fed. (4B77) - 20% Local (4BG7)~|~05 - 4R Maintenance - Resurfacing~|~AAD70C9D35451A0A3A1BFA0FE10B9DA4C2F58D7C 92555~|~2~|~4~|~04/SAF~|~Plan Split for all work Greater Cincinnati Water Works in Part 2. (Extending the southbound right turn lane to westbound IR 275)~|~21 - Safety~|~0A2ABDFC76DBEA23D133D70392C9ACF0FAA44C48 92555~|~2~|~3~|~03/SAE~|~Part 2 Set of Plans Safety Work: 0.07 miles north of IR275 to Struble Road (0.61 miles north of IR275). Extend southbound right turn lane to westbound IR275 on ramp. Original design under pid 84437 but sold under pid 92555~|~21 - Safety~|~27DC36D8D6502A64304F4D340CF910FF56E04525 92555~|~1~|~1~|~01/SAE~|~Part 1 Set of Plans Safety Work: 0.07 miles north of IR275 to Struble Road (0.61 miles north of IR275) Widen northbound US27 for a third lane ending as a right turn lane at Struble. Part 1 originally designed and sold under PID 92555;~|~21 - Safety~|~85C901A449328CC6646CBC603C91CF960E6641B4 92555~|~1~|~2~|~02/SAF~|~Plan Split for all work Greater Cincinnati Water Works in Part 1. (widen northbound US 27 for a third lane ending at Struble).~|~21 - Safety~|~FC0744808DDE5082914AC8660DD7DB787366975A 99959~|~1~|~1~|~01/IMS~|~Pavement work to reconstruct the interchange including ramp work~|~04 - Reconstruction - No Added Capacity~|~2569F9FEB100A7C238985432AF0D3515D560BFF4 99959~|~1~|~2~|~02/IMS~|~Work on 5 structures to include replacement and/or lengthening~|~04 - Reconstruction - No Added Capacity~|~5EEDFFE70CE860278061436C972ACDD8E5F23DFD 115034~|~1~|~1~|~01/SAF~|~Split for ramp clear work at WB Clague Road exit, PID 115034. ~|~21 - Safety~|~DA1BF14CD52D06F9C4F648A2C7A447A4DD12B0B3 115034~|~1~|~2~|~02/SAF~|~Split for ramp clear work at WB West 130th Street exit, PID 115031. ~|~21 - Safety~|~DED102D3B9CD6E1C6AD5569579DCEC5E2B6729F1 117376~|~1~|~1~|~01/MPO/BELO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~52909EAE398F3587B5EABEF28CECA979C566C5C0 124193~|~1~|~1~|~01/BRO~|~Bridge hit repair.~|~13 - Bridge Rehabilitation~|~44515C2E05D84ABCC2E2CCD24BDFCF35868DA4DB 90428~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 574 0.15 (SFN 6104770) and NOB 574 0.40 (SFN 6104835). 100% State funded.~|~10 - Bridge Replacement~|~EAAAB5F55F42CDF6A4022C9DBDC749DBB5BDA883 114599~|~1~|~1~|~01/NFP~|~Chipseal in HIG.~|~05 - 4R Maintenance - Resurfacing~|~801C3FC6CABD7B3FD8778C7F125F910589A8372F 114599~|~1~|~2~|~02/STR~|~Chipseal in HIG.~|~05 - 4R Maintenance - Resurfacing~|~CDAB65CDDC9D366199989C80DD315AA2A68660DF 114599~|~1~|~3~|~03/S<2~|~Chipseal in HIG~|~05 - 4R Maintenance - Resurfacing~|~B3D15D72D7542D22CA26122F74FE01AE9CBB2EED 110912~|~1~|~1~|~01/SAF~|~Safety funds plan split~|~04 - Reconstruction - No Added Capacity~|~6F8172B39974F070A2D17DC35834BA6B67B46FD0 102268~|~1~|~2~|~02/STR~|~Spray lining of CFN 781930390 TRU-SR 193-15.50~|~04 - Reconstruction - No Added Capacity~|~52944ADA8338FC13A2B6106E9DB33924FF6EE8F3 102268~|~1~|~1~|~01/STR~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~2F2AAB7234494EAB809D6BA1595B8D29B621C9FE 124838~|~1~|~1~|~01/STR~|~Resurfacing work on CR 424 under the STP Rural classification.~|~05 - 4R Maintenance - Resurfacing~|~BAB72A5041F0F6895F4280068C9C3767583E63BC 90952~|~1~|~1~|~01/SAE~|~This split uses federal Safe Routes to School funding and is eligible for 100% funds.~|~28 - Facilities for Pedestrians & Bicycles~|~719C148F8CA9C6160160CC7C64E167BEC1AE6A93 98544~|~1~|~1~|~01/NHS~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~982C3FED010A03C5E4589A8FA0FFB62D6F68C3C7 125953~|~1~|~1~|~01/NFP~|~Plan split for annual tree clearing contract using state maintenance funds~|~44 - Other~|~6AE8D3C131BEF0D0E5CA362C17B19BC3388CAE22 95939~|~1~|~1~|~01/IMS~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Resurfacing of portions of Mus-70-(21.44-27.35)~|~05 - 4R Maintenance - Resurfacing~|~994D9893FA8C1D523D742F07544D52F8E8A3863E 95939~|~1~|~2~|~02/NFP~|~District Preservation Program - 4PS7 (100% State) - No CAP - Bridge work and deck sealing~|~13 - Bridge Rehabilitation~|~D38B6B435130FE233149BE74DD647F1F8DFC9DE4 116899~|~1~|~1~|~01/NFA~|~Adding for potential J&C involvement~|~~|~6A67F0B7C7C1745DBDFEC6633FFDA27F9F2E0B81 121856~|~1~|~1~|~01/S5K/COS~|~Sidewalks and curb ramps along 2nd Street from Vine Street to Brown Lane. (TAP Safety 80% 4B37/20% 4HJ7)~|~28 - Facilities for Pedestrians & Bicycles~|~31EE3EBAD5DC218B0EB5BAD2107CD1EA27912967 121856~|~2~|~2~|~02/NFP/COS~|~100% Local drainage work.~|~28 - Facilities for Pedestrians & Bicycles~|~BE1AD5B633DEF1743C5AB91B58DA6B3766AAC368 109335~|~1~|~1~|~01/NFP~|~ODNR project to resurface south of river at Beaver Creek State Park~|~05 - 4R Maintenance - Resurfacing~|~E5190877B5D4123AFFD7E908DF4B5B3432448A5C 107765~|~1~|~1~|~01/NHS~|~Rock fall LAW 7 0.70~|~21 - Safety~|~B1AFEF63707581EF1B5950590C4FC2384410D6F2 113327~|~1~|~1~|~01/NFP~|~The City will extend Abbott Park Way 1,100 feet. The extension will be 39? wide to match existing roadway as per city code.~|~44 - Other~|~0F3EC2B19BF8E3444EF147BE72564F9156B06C18 113327~|~1~|~2~|~02/NFP~|~The City will extend Abbott Park Way 1,100 feet. The extension will be 39? wide to match existing roadway as per city code.~|~44 - Other~|~9D068B94F3FAA8E90E77B8C7047AC942E60FFF5A 120110~|~1~|~1~|~01/NHS~|~added plan split for the installation of a restricted crossing U-turn on US Route 32 around the state Route 220 intersection in Pike County.~|~21 - Safety~|~588939202468F89C9A79BE56595700CFE980BA31 126314~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items. ~|~05 - 4R Maintenance - Resurfacing~|~A59E9A445C45AEC36C92E3BEC9F4189615C6646C 123744~|~1~|~1~|~01/NFP~|~Annual maintenance contract to maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings, and school zones throughout the district.~|~21 - Safety~|~B5588FCFE88B294B9479E9B07A33A6761A807A0B 96232~|~1~|~1~|~01/NHS~|~NHS SLM US23 18.53 to 22.23; US23D 2.52 to 4.26 and 4.40 to 4.46~|~05 - 4R Maintenance - Resurfacing~|~5975297679962B9588CB13B2A8E0E88227E0BDFF 96232~|~1~|~2~|~02/S>2~|~STP>2 SLM US23: 15.31 to 18.53; US23D 4.26 to 4.40~|~05 - 4R Maintenance - Resurfacing~|~AFC10BBD6ED8892FD593C4CF275672479F228ED6 96232~|~1~|~3~|~03/NHS~|~2500868 FRA-23D-2.95 Deck overlay~|~13 - Bridge Rehabilitation~|~F5014AF1C491895E315441C26984464202069ECF 119051~|~1~|~1~|~01/BRO~|~Local Bridge funds to rehabilitate bridge~|~13 - Bridge Rehabilitation~|~A1EF152D49D4BAE13C0A68ABCD11D7B67509DE00 113412~|~1~|~1~|~01/SAF~|~100% CEAO HSIP funding for upgrading guardrail on county roads~|~21 - Safety~|~14A53B6F5446C182FA7481F8C5F17810DE1D64D6 114347~|~1~|~1~|~01/ENH~|~Paving B&O Trail from Bellville to Mansfield (North Lake Park)~|~~|~A8062E06789D0DAF3C48787039BCA245F6333326 113282~|~1~|~1~|~01/STR~|~Replace culverts:ERI-SR-113 20.179 CFN 1884885Replace with Box or Ellipse HUR-SR-13 4.130 CFN 1835332 Replace with Circular ~|~04 - Reconstruction - No Added Capacity~|~9BCA57C2F2B91A1F35BFAC3DF825B5B82FC7ACD1 114545~|~1~|~1~|~01/STR~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~D2828CB6C23F1BDADCF781C2F92F18B6E4143E48 119815~|~1~|~1~|~01/NFA~|~Created for J&C Task Order~|~~|~49BB0356697BFA3094E3B9FBB88C54E986018617 100562~|~1~|~1~|~01/IMS~|~Construction Inspection~|~17 - Construction Engineering~|~D810C40EAF9B050B00BE0E3960A4DC5961C62AF7 105744~|~1~|~1~|~01/IMS~|~Plan split for pavement PM work~|~05 - 4R Maintenance - Resurfacing~|~B491B3DF17B5BF3C12013EFE4238F1D188B68860 108803~|~1~|~1~|~01/IMS~|~Plan Split~|~13 - Bridge Rehabilitation~|~D0E6BB1FCDAFDA82AE4E896D1235EC8A4B6F9337 106763~|~1~|~1~|~01/NFA~|~The City will widen approximately 5000 feet of Beech Road.~|~01 - New Construction~|~4F3A80017559AAB14CF1B1F35EF683E1BEB80A47 116056~|~1~|~1~|~01/STR~|~Plan Split 01/STR: Gue-513~|~05 - 4R Maintenance - Resurfacing~|~04DC6B5BF0AAB3DA28C3598DB9AD9A901905353D 126605~|~1~|~1~|~01/MPO/CAMP~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F9A2CA437E25DD49987246919CFC58DBD7EF73D9 94114~|~1~|~3~|~03/STR~|~Minor maintenance to the linked structures with a 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~220FC1EA0CE99D3B611A312005DE4F18CF52CDB6 94114~|~1~|~2~|~02/STR~|~Bridge maintenance to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~CED2A906D5CD86BFF6E87DE828C6E9341564E13E 94114~|~1~|~1~|~01/STR~|~Resurfacing TRU SR 534 from 13.25 to 19.12~|~05 - 4R Maintenance - Resurfacing~|~C3254735C9D9F0974C5F5E0938D31E5443ADC1B9 126321~|~1~|~1~|~01/NFA~|~Created plan split for detailed design - NEVI Round 3.~|~~|~3747796FAFE56A41101315794D2E22F01761F1BD 126321~|~1~|~2~|~02/NFA~|~Created plan split for construction - NEVI Round 3.~|~~|~C90408488A166E3968A9380874850C3BE0933739 86697~|~1~|~2~|~02/S<2~|~Urbanizd Area Microsurfacing: ERI 6 19.25-23.12, 23.69-27.71~|~99 - State Preventative Maintenance~|~949521E2012D111FEA5598A4E9FD1AF83D879490 86697~|~1~|~1~|~01/STR~|~Rural Microsurfacing: ERI 6 23.12-23.69, LOR 82 0.00-10.06~|~99 - State Preventative Maintenance~|~C13781E91FA972B9A8449C226C2EF951F8284909 96992~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~44 - Other~|~EEBF3E49815DC617A2F6B39C859A35303A114476 92342~|~1~|~1~|~01/NFP~|~"01/NFP/OT/ " - D05 Facilities Funding - No CAP - Construction of storage buildings: 1) Coshocton County Garage (Cos-CR 621); 2) District 5 Headquarters (Lic-SR 13); 3) Duncan Falls Outpost (Mus-SR 60); 4) Moxahala Out Post (Mus-US 22); 5) Etna Township Out Post (Lic-SR 310);~|~44 - Other~|~EE22343F314C5D7CDCCBE17EE48905222E136FDB 122425~|~1~|~1~|~01/NFP~|~Plan split for crack sealing and maintenance of park driveway and parking lots~|~05 - 4R Maintenance - Resurfacing~|~A811CDEBDA7E8875A62D09EA1450C96D9E1E1911 123859~|~1~|~1~|~01/IMS~|~Emergency project to repair the WAS 77 0.31 Bridge, SFN 8402949. Funded 100% State.~|~13 - Bridge Rehabilitation~|~44811231C8B16ECCEA7D287242B3AD494BCBC2A8 123211~|~1~|~1~|~01/MPO~|~Plan split for eligible TLCI funded implementation work that includes bike lanes, enhanced crossings and pedestrian upgrades.~|~~|~74C99020831197C0F8ACBC9E25EFFEE40E8A0DEC 123211~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~~|~CA4467CFC209B4F47A3501B2A1DBC7ED2A38E441 122468~|~1~|~1~|~01/NHS~|~Plan split is for the drainage improvement along BUT-27~|~66 - Resilience Improvement - Highway Project ~|~971764EABAA910DD18EB8813A3C17D15B69012E0 100829~|~1~|~1~|~01/STR~|~Rehab Bridge BUT-732-0304 by replacing the deck and painting the structural steel.~|~13 - Bridge Rehabilitation~|~E3854A0EBD1E643B3C964514073B4B507E7B6067 88874~|~1~|~1~|~01/STR~|~District Allocation - 80/20~|~10 - Bridge Replacement~|~BC67A2852AF608ADD57F7A5B314F9C4F0532A100 125128~|~1~|~1~|~01/ENH~|~Plan split for federally eligible funding of Heartland Trail Phase 4B.~|~28 - Facilities for Pedestrians & Bicycles~|~2FB9573B9A31024F99538A067A45B664ABF7562A 122147~|~1~|~1~|~01/NHS~|~Bridge Rehabilitation.~|~13 - Bridge Rehabilitation~|~DE4A63D090A5963090514AE9D65507B97EC09770 114677~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~F197F126B0D7D87E3175535DB12F809FF078DEA1 94069~|~1~|~1~|~01/NFP~|~Construction of septic/leachfield at Gustavus outpost, Trumbull County, Ohio.~|~~|~C03A52B845FEA9BCC779E4C588398632618F74C6 112971~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs using Indefinite Delivery Indefinite Quantity (IDIQ) construction project format.~|~47 - Bridge Preventive Maintenance~|~C2753D39EBDA9DD40FE093C776AA89085D9F0372 95531~|~1~|~2~|~02/NHS~|~HIG 62 (13.56-15.80) This is for the portion of US 62 with a Local Match. Federal/Local Match 80/20~|~05 - 4R Maintenance - Resurfacing~|~44660DC502EFFC81622A7086563F78C353EDE8FF 95531~|~1~|~1~|~01/NHS~|~HIG 73 (7.08-7.41) HIG 62 (13.32-13.56 / 15.80-15.89)Pave Thru bridge is SLM 13.4980% Federal /20% State~|~05 - 4R Maintenance - Resurfacing~|~97A31FBF4901FDD6A7C4B52499F812A8F3E28C3E 95531~|~1~|~3~|~03/NHS~|~Plan split for 100% local match to cover possbile curb ramp and sidewalk work.~|~44 - Other~|~9187267DE1D88A60E72E9977897B817117A09115 102900~|~1~|~1~|~01/SAE~|~Pavement markings on various Medina County roads.~|~21 - Safety~|~8CFF4AFE70DDE6CDC8C7481BA8B069B2498F3E5C 109408~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~831D49560454FE8CB47D75C0D5568C39C5E26AB9 126181~|~1~|~1~|~01/NHS~|~Resurfacing & other improvements~|~05 - 4R Maintenance - Resurfacing~|~808438DFD3B944B5243FE1640AAACDBDA1932645 116661~|~1~|~1~|~01/NFA~|~Not on Federal Aid System - Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4B80963800DBD5C0B79799C8BDA8220D95949837 116661~|~1~|~2~|~02/S5K~|~STP>5 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4040F1516E8CAB4D6B8728656674883AC30C4AD9 116661~|~1~|~3~|~03/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~2997541622564730706E26C7FE839B79AB57A4F4 113423~|~1~|~1~|~01/NHS~|~New signal at MAH SR 11 southbound ramp at Mahoning Ave~|~21 - Safety~|~3CAA5E79F11632FCDEF1B447D7C83B36F0AFEADB 113423~|~1~|~2~|~02/S>2~|~New signal at MAH SR 170 at Lake Park Drive.~|~21 - Safety~|~CABF3A35ED467CE66E34DC454CCE42F3D51645D2 107902~|~1~|~1~|~01/SAE~|~Construction of sidewalk on the north side of the Dayton Yellow Springs Road bridge over Beavercreek.~|~28 - Facilities for Pedestrians & Bicycles~|~93B0C3B6E70633C7339CF82960B72F1F2D57F43E 107902~|~1~|~2~|~02/BRO~|~Split for the rehabilitation cost (100% locally funded) for the bridge carrying Dayton Yellow Springs Road over Beaver Creek.~|~17 - Construction Engineering~|~34F6BE8A97EE64455D833489FF8431D292F06454 77370~|~1~|~8~|~08/MPO~|~MORPC/Columbus funding for landscaping (Main St bridge), brick paver sidewalks, additional pvmt widening on Mound & Fulton for bike lane~|~08 - Bridge - New Construction~|~205ED46C801B7FEA3D1214FEF4BC8DF1D157E9F6 77370~|~1~|~7~|~07/IMS/AEP~|~100% AEP funded utility items~|~43 - Utilities~|~36D7E4DACBE426E5F1B33C226970D5BA48D3E170 77370~|~1~|~9~|~09/IMS/COL~|~100% City of Columbus items for brick crosswalks, electrical work~|~31 - Landscaping & Other Scenic Beautification~|~BB47AE2C0633048825E74F2A65E99B186A9B7C27 77370~|~1~|~1~|~01/IMS~|~Placeholder plan split for IM funding~|~04 - Reconstruction - No Added Capacity~|~F945FD2A6E6C726FD76F2921C187B8E0B7E146C8 77370~|~1~|~2~|~02/NHS~|~Placeholder plan split for NH funding~|~17 - Construction Engineering~|~CA978939AEDC5CBE4AE3909CE5E330D44BAEB079 77370~|~1~|~3~|~03/IMS~|~Placeholder plan split for IM funding for bridge replacement, no added capacity:~|~10 - Bridge Replacement~|~8E96A013DB3D30FD0951C8077AD48B372BE07BA3 77370~|~1~|~4~|~04/NHS~|~Placeholder plan split for NH funding for bridge replacement with capacity~|~17 - Construction Engineering~|~036CD9CD864013091E314FDC6CF25EA7CFD839B7 77370~|~1~|~5~|~05/IMS~|~Placeholder plan split for IM funding for new bridge construction and retaining walls~|~08 - Bridge - New Construction~|~DF8DBEAD11E2C6F26472DFA4619E8E3F720A9C73 77370~|~1~|~6~|~06/IMS~|~IM funding for project eligible utility items: water, sanitary, electric, traffic surveillance~|~43 - Utilities~|~EBB2E7B6554D84BAC892D631D5398D9A121C41C3 113634~|~1~|~1~|~01/S>2~|~The project will widen SR 741 between Cox-Smith Road and Spyglass Hill to include two lanes of travel in each direction with left turn lanes at all intersections. The project will also include signal improvements at Cox-Smith Road and Stone Ridge Drive with back plates, street trees, street lighting, a shared use path, sidewalk and right turn lanes.~|~03 - Reconstruction - Added Capacity~|~B4511DD5B89341D2B918E6FA634415E7CF6F69C6 101583~|~1~|~1~|~01/S<2~|~DSR# JEF-018~|~04 - Reconstruction - No Added Capacity~|~BB165FED154E4294B8A2BAB0EBAF98F236919705 95525~|~1~|~1~|~01/IMS~|~Remove and replace concrete overlay, patch curbs, abutments and parapet, structural steel repair, refurbish bearings, paint superstructure and various other bridge repairs. CLA-70-0826, SFN 1204084, CLA-70-0970, SFN 1204114, CLA-70-1024, SFN 1204149~|~13 - Bridge Rehabilitation~|~B143B2F58925D804F02513838E5A4C3882149398 113442~|~1~|~1~|~01/NHS~|~Major rehabilitation pavement work on COS-36 and TUS-36 from SLM 0.00 to SLM 3.67.~|~04 - Reconstruction - No Added Capacity~|~E7A1C67D65B987FB820F541885D9E8E546B95C5A 113442~|~1~|~2~|~02/STR~|~Major rehabilitation of TUS-36 pavement from SLM 3.67 to SLM 3.85.~|~04 - Reconstruction - No Added Capacity~|~6C4EA6E2DD3B73C2509B51A0AFC81DF34AFF4792 113442~|~1~|~3~|~03/NHS~|~Bridge work associated with SFNs 7900120, 7900155 and 7900244.~|~04 - Reconstruction - No Added Capacity~|~5DD435C6750BD55C6D6A4BB239CDA3E6F38E7A08 126971~|~1~|~1~|~01/STR~|~Lowell Pedestrian Improvement WAS SR 60 10.28-10.68mm~|~21 - Safety~|~254BCDA895AA0D3C7145F70E5EF20688CA1EFBD4 101695~|~1~|~1~|~01/STR~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~7ADBE72703AA8634F22051EBCB4CB9F74C8C29B1 102837~|~1~|~1~|~01/IMS~|~Applying smooth seal to Interstate route~|~05 - 4R Maintenance - Resurfacing~|~7999B9DDDFB745BA590A8F49EB52BC8E8A41D919 102837~|~1~|~2~|~02/S>2~|~Applying smooth seal to STP > 200k routes~|~05 - 4R Maintenance - Resurfacing~|~F74BD6A065CC5F6D0A3EB7076D6AA57BEF9C4986 102837~|~1~|~3~|~03/STR~|~Applying smooth seal to various STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~F276366A9BC2C88C9AA795EEC6395219DF1C6AD6 121379~|~1~|~1~|~01/NHS~|~Plan Split for Urban Paving funded scope on SR-184~|~05 - 4R Maintenance - Resurfacing~|~9D24FEB5E4D6F52C8ABF5917D97CFA78BF2DF6E9 121379~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope on SR-184 (full-depth repairs), scope on Alexis Rd (not on SR 184) to Suder Ave, and sidewalks~|~05 - 4R Maintenance - Resurfacing~|~DB7D40963C4260CBCC56F27A85288DC67BB1A5A3 98119~|~1~|~2~|~02/S<2/MAR~|~STP<200 Urban Paving Marion SLM: 7.46 to 8.5~|~05 - 4R Maintenance - Resurfacing~|~D7215DE95DA9F5FAA007B46FFEF7F0450DA0FBEB 98119~|~1~|~1~|~01/STR~|~STP Rural 80/20 SLM 0.00 to 7.46; 11.37 to 16.37~|~05 - 4R Maintenance - Resurfacing~|~DE37C47505DA924AE92C2A7856C37C586F8C2A1B 113175~|~1~|~1~|~01/MPO/SUCE~|~Resurfacing of Ravenna Rd from Old Mill Rd to Portage County Line, a portion in the City of Hudson.~|~05 - 4R Maintenance - Resurfacing~|~030AC17A9523DFB265A9B845C25D837F7A9DBDDD 88297~|~1~|~1~|~01/NFA~|~Plan Split for normal project costs for Fifth Ave oil separator, D6 4MA7 (facility) funding.~|~05 - 4R Maintenance - Resurfacing~|~7271F5A971EE5BE8FC65F19FB4659C0EBE352D4A 93788~|~1~|~1~|~01/STR~|~Replace SFN 3600300Located 3.00 miles east of Leesburg on SR28. It it proposed to replace the deficient structure. 80/20 split01/STP/BR/State~|~10 - Bridge Replacement~|~E912CA7CFEEF860F51DDC27CFA993868CBF5A99D 92371~|~1~|~1~|~01/NHS~|~Resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~8E0F1341093BC9B966D0245B9BA300D28153658B 119171~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~953E6517E5A6856ED7F5F32C1FDBBA08C8B77F58 98117~|~1~|~2~|~02/STR~|~Spot Paving throughout District 11.~|~05 - 4R Maintenance - Resurfacing~|~5E99C18E912C772C25537CF77944315D7093A0B8 98117~|~1~|~1~|~01/STR~|~Spot paving locations in the Village of Scio.~|~05 - 4R Maintenance - Resurfacing~|~22245F9F72DCD5623CE45F1F1D53A556F8DE8336 101140~|~1~|~1~|~01/STR~|~Bridges~|~10 - Bridge Replacement~|~18020D79E1C91D26A34E8F3F473E696DEF71BC69 105734~|~1~|~1~|~01/NHS~|~Plan Split 1 for federally funded items~|~03 - Reconstruction - Added Capacity~|~0878356A5AF84772D5459D276484BA8DAF01EA8A 105734~|~1~|~2~|~02/S>2~|~Plan Split 2 for 100% local items~|~03 - Reconstruction - Added Capacity~|~4E00A387477E92CD1D020BA70393A18C3B6A203C 106645~|~1~|~1~|~01/S<2~|~Provide a pedestrian walk/bike way from Scott St. along McKinley Road to U.S. Rt. 33, crossing 33 with a 2-span pedestrian bridge and ending at the parking lot of the St. Marys Middle\High School.~|~28 - Facilities for Pedestrians & Bicycles~|~B7164559C85289B392B6B092977DCDB56B03CAE4 106645~|~1~|~2~|~02/SAF~|~Anti-Graffiti Coating ~|~21 - Safety~|~1FF740C7E308DF0FCF6012CE3C77B0E2B32E74EE 106645~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~28 - Facilities for Pedestrians & Bicycles~|~E7554C6E8D5ABE42E3333CE3B33927EDE5DEAB83 101465~|~1~|~1~|~01/NFP~|~Crack Seal~|~44 - Other~|~5EFCB13172FEE231C6F593285DBA2DFDB337C540 83323~|~1~|~1~|~01/BRF~|~REPLACE STRUCTURALLY DEFICIENT TWO-LANE BRIDGE WITH THREE-LANE STRUCTURE, INCLUDING ASSOCIATED INTERSECTION AND APPROACH IMPROVEMENTS SFN 5761492 MMOTMR **C : 0.000 : 0.000~|~10 - Bridge Replacement~|~9599057C04E9D2761B83325D435FA62DC2D1FDE0 124556~|~1~|~1~|~01/S>2~|~Rubblize and resurface.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1818CC0F7F847C543774653A6C76E4E4683B6D3D 124556~|~1~|~2~|~02/STR~|~Rubblize and resurface.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~86D7F1B55B8E2909BBB972B51F4C06C6C1D46368 114223~|~1~|~1~|~01/NFP~|~Guardrail repairs/replacements on various routes in District 4.~|~21 - Safety~|~B1E1632CC4F7998CFFE58E4E10875C38B477327D 101348~|~1~|~1~|~01/STR~|~bridge repl.~|~~|~8345F21C82BD1E3E9385F5998E8D8C46D0827138 102013~|~1~|~1~|~01/NHS~|~Split for work on Richmond Rd north of Chagrin (NHS).~|~05 - 4R Maintenance - Resurfacing~|~7BF6A3C5624B5593E69BD7AD11D9D01F19DB7447 102013~|~1~|~2~|~02/NFP~|~100% local participation for items of work that is not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~FC3231044004E35658551C3BBCE3560E3F7AFD4E 79207~|~1~|~1~|~01/NHS~|~Bridge painting project. ATH 50 0945 (SFN 0501506), ATH 50 0945 RT (SFN 0501522), ATH 50 1184 LT (SFN 0501468) and RT (SFN 0501514). NHS route funded Federal 80% and State 20%.~|~44 - Other~|~AFFF20D6B90FF351848995D282252A5E84B4ED54 105535~|~1~|~1~|~01/IMS~|~Interstate Plan Split: MAD-71-4.50-4.56~|~05 - 4R Maintenance - Resurfacing~|~3497D826F8439B6504463240B972F7C8A932BE03 105535~|~1~|~2~|~02/NHS~|~Priority System NHS Plan Split: MAR-23-10.62-19.97 PIC-23-22.63-23.16~|~05 - 4R Maintenance - Resurfacing~|~A7B6E090387B6489F7E2911F90E9C20AC572FED6 105535~|~1~|~3~|~03/NHS~|~General System NHS Plan Split: PIC-23-16.94-17.33~|~05 - 4R Maintenance - Resurfacing~|~94FBDF170B6A33EA5C7441663CDA78BC640F7748 105535~|~1~|~4~|~04/STR~|~Rural Plan Split: UNI-245-0.00-7.02 UNI-739-2.63-5.94~|~05 - 4R Maintenance - Resurfacing~|~F880DF36B988581BB23FA1AF62EEA7D2C1F1F0F7 105535~|~1~|~5~|~05/S<2~|~Urbanized Area Plan Split: UNI-245-7.02-7.50~|~05 - 4R Maintenance - Resurfacing~|~11687BC515ACBDCFB30F1DAF36615FDCB24318D5 92382~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PS7(100% State) - No CAP - Bridge rehabilitation on 6002196 MUS SR60 28.87 Intersect: Over Big Run; BR Eligible: Length=67 SD/FO(1) SR=64.3 DSR=4~|~13 - Bridge Rehabilitation~|~745015CEDEDCAD666BF1558D0363B1DA12BFD724 111407~|~1~|~1~|~01/NFP~|~FY 21 Herbicidal Spray~|~44 - Other~|~4CFA105643C70DD3467C42FCBEAD402578724F1A 115055~|~1~|~1~|~01/NHS~|~Plan split to program project, update at project scoping.~|~10 - Bridge Replacement~|~C9B4C9CA0B01085106A774B572E53329226C6BE1 99389~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for construction of a salt storage building near the Village of Amanda on US 22.~|~44 - Other~|~F07C139B2E9F01FBDDA079117FA6637C93AC1C81 110589~|~1~|~2~|~02/NHS~|~Culvert replacements.~|~17 - Construction Engineering~|~376306DEAC88B5E80BEEC1FC029173D2ECD9B0EB 110589~|~1~|~3~|~03/S>2~|~Culvert replacement.~|~21 - Safety~|~8F0CA8D5BD1E1453AABA165ADDAAE6BC4D2CE065 110589~|~1~|~1~|~01/SAF~|~Installing Restricted Crossing U-Turn (RCUT) at the TRU US 62 and Bedford Rd intersection.~|~21 - Safety~|~E338A777E25BB999AE748FA6B3003054106BDC6B 98382~|~1~|~1~|~01/NFA~|~Road Improvements to support expansion by Ohio National Financial located at One Financial Way and Pfieffer Road~|~04 - Reconstruction - No Added Capacity~|~2D566DFC87EED75B891E3245B4D59D9AF88E4344 113021~|~1~|~1~|~01/STR~|~All work on the project is included in this split. Funded with safety funds SAC 4HJ7 (at 90%) and SAC 4BC7 (at 10%).~|~21 - Safety~|~62B4E9EEAE7608AA02D044E748393B677577AB2E 95315~|~1~|~1~|~01/CMQ~|~Interconnection of existing traffic signals along Indian Ripple Road (between Greene Dr. and North Fairfield Rd.) and North Fairfield Road (between Indian Ripple Rd. and Jonathon Dr.) with fiber optic cable, and connection to the existing fiber optic system that currently terminates at Jonathon Drive. In addition, controller upgrades and reconstruction of the existing signals at Indian Ripple Road and Grange Hall Road, and North Fairfield Road and Shakertown Road to mast arm signals.~|~21 - Safety~|~328C9B76BDD6B2EE2088D826B7928B4D79E00447 95665~|~1~|~1~|~01/S>2~|~Bike path in Rossford.~|~~|~FA27C2FB22D2A1995D649A8A7D54782B5F53A893 98403~|~1~|~1~|~01/STR~|~CRA-96-0.00-11.42 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B678DA49C3BAC8E8E803DDE30306412BA70C8B8D 101497~|~1~|~1~|~01/STR~|~DSR# BEL-018~|~04 - Reconstruction - No Added Capacity~|~426952A35BCF018C4DE925422C5EDC866953DEFE 101608~|~1~|~2~|~02/S<2~|~District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Cos-541-17.79 to 18.72~|~05 - 4R Maintenance - Resurfacing~|~9B2286C15D00C177A3DA98FE52CBAD642361588C 101608~|~1~|~3~|~03/NFA~|~District Preservation 7BPB/4PS7(100% State) - See CAP Comments - Resurfacing of Cos-206-00.00 to 03.37~|~05 - 4R Maintenance - Resurfacing~|~BA25D0EC6DB5663D0134B72C11A1A8E58D3EB418 101608~|~1~|~1~|~01/STR~|~District Preservation Funding 4PF7(80% Federal) / 7BPB/4PS7(20% State) - See CAP Comments - Resurfacing with related work on Cos-541-08.73 to 17.79 and Cos-541-23.63 to 29.48~|~05 - 4R Maintenance - Resurfacing~|~2AC9216E36A592DA79DFDC29E89C42CD4E5C481D 91619~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (COL-344-0666, SFN 1505041) with a new bridge. Bridge type to be determined by performing a feasibility analysis for structure type.~|~10 - Bridge Replacement~|~A422773CA7FB86DDC2EC2A557A04688FBE623DB0 124446~|~1~|~1~|~01/SAF~|~Safety improvements. ~|~21 - Safety~|~B0572C07257FFE04CBA4DB528FCF244076E73263 92254~|~1~|~3~|~03/STR~|~"03/STR/OT/ " - District Preservation 4MP7(100% State) - No CAP - Striping and Raised Pavement Markings on GUE SR513 0-14.74~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~06D2657C28F9E7AB627312C9BAC7922D73F0E679 92254~|~1~|~5~|~05/STR~|~"05/STR/OT/ " - District Preservation Culverts 4CW7 (Federal 80%) / 4CV7 (State 20%) - No CAP - Drainage repair work within Quaker Village on 1) Gue-SR 513-01.88 to 02.02; 2) Gue-SR 265-13.64 to 13.76;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4DA2484CF917C739432BDC6A61B0C2AFA67458CD 92254~|~1~|~4~|~04/NFA~|~"04/NFA/OT/ " - District Preservation 4MP7(100% State) - No CAP - Resurfacing on GUE SR761 0-2.43~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68EFA6CBC18519D28E01E342F81726AD2978F1B7 92254~|~1~|~2~|~02/NFA~|~"O2/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on GUE SR761 0-2.43~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~740F76D3CD4CEA9EEBAD6316E96D511F3D25E03D 92254~|~1~|~1~|~01/STR~|~"O1/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on GUE SR513 0-14.74~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7ED4871138EE34273B68A9967F558D444DDFAD8E 102987~|~1~|~2~|~02/IMS~|~Plan Split for the Rural sections of the project. This includes CLi-71 and a portion of WAR-71 between SLM 9.8-14.2~|~05 - 4R Maintenance - Resurfacing~|~D4D013D1512D8319DED99F02BC8E009C78B0272A 102987~|~1~|~1~|~01/IMS~|~Plan split for the Urban sections of the project. This includes a portion of WAR-71 between SLM 8.42-9.8~|~05 - 4R Maintenance - Resurfacing~|~C3B4664B91C9936072743720F133FA592827CF7C 125911~|~1~|~1~|~01/ENH/HUDS~|~Construct new pedestrian/bike path.~|~28 - Facilities for Pedestrians & Bicycles~|~6B3319480EFEB0EC8247A2293555784BD32ECBD3 114320~|~1~|~1~|~01/NFA~|~Created for ODOT J&C funding~|~44 - Other~|~B5F2108A8483C4DBE9E4D12E6A53F84E00C46FE0 122081~|~1~|~1~|~01/MPO~|~TLCI Items~|~28 - Facilities for Pedestrians & Bicycles~|~DEA0FD0E3304B583F099F930A399D053A2CD232D 96883~|~1~|~1~|~01/NFP~|~Construction of two Dynamic Message Signs (DMS) in Jackson and Liberty Townships, Mahoning and Trumbull Counties, Ohio.~|~44 - Other~|~5E3F77A44A18A7769501AD35A2395DAE8C28E786 107070~|~1~|~1~|~01/SAF~|~Build a single-lane roundabout at State Route 162 in Montville~|~21 - Safety~|~28F12EFCD3BE54C9D57FB098C8A5A3F39204D93C 107070~|~1~|~2~|~02/SAF~|~The Medina County Sewer District water line relocation work.~|~21 - Safety~|~443DE526707EE945A244D83BBA033FDF17A1D157 107070~|~1~|~3~|~03/SAF~|~Ongoing Consultant Services during Construction~|~~|~625CF77754766E531E2F10F4FD7695F68F2B5CBF 122982~|~1~|~1~|~01/STR~|~added plan split.~|~10 - Bridge Replacement~|~E13D1D75B47113EFE6C3D577582A75DF9776A644 98572~|~1~|~1~|~01/SAF~|~Systematic Sign Replacement~|~21 - Safety~|~127B5AA34A448BEDE3844468B55F4CAE6A402675 118328~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at ASD-42-13.40/SR-89~|~21 - Safety~|~0F88BA137C7C7908A1FDA3B6ED438096CCE1FDCF 103427~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~422DEF19CABF1535265CB62E5ABED1FDC3684DD9 115016~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~482F29AD0D8E331E00B01F9E76101E1F80F7B960 91945~|~1~|~1~|~01/STR~|~Resurfacing eligible for rural STP funds. Section of SR 231 classified as a Rural Major Collector from 7.77 to 10.36. 80% SAC 4PF7 20% SAC 4PS7.~|~05 - 4R Maintenance - Resurfacing~|~075D160E6AD85F8AD981FB83F7C251B856C714F1 91945~|~1~|~2~|~02/NFA~|~Resurfacing on road not eligible for federal funds. Section of SR 231 classified as a Rural Minor Collector from 10.36 to 17.87. 100% SAC 4PS7. Federal funds cannot be used to resurface Rural Minor Collectors.~|~05 - 4R Maintenance - Resurfacing~|~7DCD496627C870C8CFC845D67A0724573D3DF7EB 120078~|~1~|~1~|~01/STR~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~C3FB4D3221029CDF28D216B8F7143C6DE18E8FB4 104250~|~1~|~1~|~01/ENH~|~Streetscape using Small City funds at 95% Federal 4B97/5% Local LNTP; TAP funds at 80% Federal 4B37/20% Local LNTP; 100% Local LNTP.~|~28 - Facilities for Pedestrians & Bicycles~|~7FBEDF645BE04EC7DA4A50CF33125DFAC0D0FF94 114051~|~1~|~1~|~01/ERD~|~The construction and extension of multipurpose trails throughout Lake County using OH175 & OH392 Earmarks.~|~28 - Facilities for Pedestrians & Bicycles~|~03C29F8D035F838EC5FDE3CE65FF7BFBE14DE8D2 90884~|~1~|~2~|~02/STR~|~Culvert Replacement / cfn:036040015 ASD-604-01.91~|~44 - Other~|~05F9D3CA109F33DE61FA2A737C01459B02F3AF36 90884~|~1~|~1~|~01/STR~|~Bridge (<20' Length) Repair : WAY-301-0517 (SFN 8505101)~|~13 - Bridge Rehabilitation~|~0A007EF3831711A4FC9E10DED631F115DA7ABF08 101977~|~1~|~1~|~01/SAF~|~Intersection improvement at POR SR 14 at Tallmadage Road.~|~21 - Safety~|~C2F127D28BEA7459D92B80DB1771BA0FDB8144E2 122373~|~1~|~1~|~01/NHS~|~Plan split for CMAQ eligible traffic signal and pedestrian improvements ~|~21 - Safety~|~17F339787F0FCD16B2E318EFC10D48CD00C252D2 119754~|~1~|~1~|~01/SAF~|~Various pedestrian improvements at 6 locations across the City of Cincinnati including sidewalk, raised crosswalks, curb bump-outs, and ADA curb ramps.~|~21 - Safety~|~0C352146009D72CA669A69E17169C595975DDF42 78711~|~1~|~1~|~01/ENH~|~"01/ENH/OT/MUSK" - Muskingum County Park District project - Funding has been uncommitted due to inactivity by the local.~|~~|~AA69592F82080F7BFC8ADD841BF384DA13845228 90718~|~1~|~1~|~01/STR~|~Geotech Funds - 80/20 - Slip Repair~|~44 - Other~|~211CBE2FE281A6DDCAEA7140575C72061F5469F8 95475~|~1~|~1~|~01/S>2~|~Resurface Ravenna Road using 80% federal MPO STP funds with 20% local matching funds.~|~05 - 4R Maintenance - Resurfacing~|~07A1117EEF6C4047C834DA5802515091F062D0E7 90865~|~1~|~1~|~01/ENH~|~Installation of new sidewalks along Haskett and Hamilton Streets in West Milton.~|~44 - Other~|~C6D52FFBF956A1C7755011CA8CCA9A40FF8DBCA4 126084~|~1~|~1~|~01/ENH~|~Shared Use Path construction along CR 23 utilizing Federal OMEGA RTPO Funds at 100% (80/20).~|~28 - Facilities for Pedestrians & Bicycles~|~DE5C8DBF6F8DC667F40547B5637ECCE05611D7DE 112954~|~1~|~1~|~01/STR~|~BRO 505 0.00-6.72~|~05 - 4R Maintenance - Resurfacing~|~B050DA14A848C2B8C46F1EA6129FC45D2BB5DD0B 112954~|~1~|~2~|~02/STR~|~Bridge preventative maintenance.~|~47 - Bridge Preventive Maintenance~|~BD6EFA69C0005C2704791A00C8EF699A434A6C29 112954~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0B4756B115172985053FA5841232871DD480AC50 127094~|~1~|~1~|~01/NFA~|~SOPEC EV charger projects ~|~63 - Electric Vehicles & Charging Infrastructure~|~54A81766F9DFA8D92544EF0AAEE68AEA40E8A129 98100~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. WAR-CR 45-4.64 (SFN: 8331855) including replacement of the existing superstructure, and minor substructure repairs.~|~13 - Bridge Rehabilitation~|~2AB585CAC46D5B9010368AADF887E323C45AF6D4 121671~|~1~|~1~|~01/S5K~|~Resurfacing STP 5,000-49,000~|~05 - 4R Maintenance - Resurfacing~|~DEF52A49FB0AF51B2BAC82790654DC0B3C71D8DC 121671~|~1~|~2~|~02/STR~|~Resurfacing STP Rural~|~05 - 4R Maintenance - Resurfacing~|~053FC8F4BE7D37184841490AD6C5300AAC203FCF 88801~|~1~|~1~|~01/NHS~|~100% City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~105591F439EAF155786F37A67DD614093B823320 88801~|~1~|~2~|~02/NHS~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~6BE908F66942D188E95BA955C3B1650317272D6C 88801~|~1~|~3~|~03/NHS~|~Urban Paving - 80/20 - District Allocation/City of Ashland~|~05 - 4R Maintenance - Resurfacing~|~A257792D035FE58745AA4471DC8C0406457FD059 88801~|~1~|~4~|~04/NHS~|~SFN: 0305138 ASD-250-24.02 Bridge Work~|~47 - Bridge Preventive Maintenance~|~F38718D78372B85324ADF2460D72C62C1A5195D9 107779~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 26 14.87-14.91. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7D96F7E8B9F65A480F1622B43A6755A95CD387BE 121597~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~F543EC878BE71CF2EFA2C5DF5807E23088E2D9BB 79762~|~1~|~1~|~01/IMS~|~90/10 District Allocation~|~05 - 4R Maintenance - Resurfacing~|~0CCDDDF45F7C1DC1CC41C8FAF8D25B29CAF72D73 79762~|~1~|~3~|~03/IMS~|~Bridge Work for Two Structures Less Than 20 ft. SFN 4705130 (LOR-90-22.01 L) SFN 4705165 (LOR-90-22.01R)~|~13 - Bridge Rehabilitation~|~7C96A176D116E1CCAA82BC690C90B9C015172986 79762~|~1~|~2~|~02/IMS~|~Bridge Work: LOR-90-18.61 (L&R) / LOR-90-21.70 / LOR-90-22.80 (L&R)~|~13 - Bridge Rehabilitation~|~84A3DDC7328997803E29511CB4322EA4B0ADF260 119741~|~1~|~1~|~01/NFA~|~Creating Plan Split for TED Involvement~|~~|~6A8B46C73C7ECBA378D35ECF8219B7289B809D6E 119291~|~1~|~1~|~01/NFA~|~CEAO LBR BFP project funded~|~10 - Bridge Replacement~|~67ED0E20C6E1A5D47E5A1DB4D553EC12585A2479 126759~|~1~|~1~|~01/SAF~|~Primary split, CEAO HSIP~|~21 - Safety~|~E8C79B1CB1934EE83BA04B1A96DDF89C807E537F 85524~|~1~|~1~|~01/IMS~|~90/10 project funding split with federal IM funds.~|~05 - 4R Maintenance - Resurfacing~|~7A0CB539E214F94C58E89551B56726E58BBE9AFD 108828~|~1~|~1~|~01/STR~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~761DA5F254AC196533B8E364A980FFF752C56A06 108828~|~1~|~2~|~02/S<2~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~AB0061EB484B65B2699D85BA5C1A850ACD6CCBFD 95999~|~1~|~1~|~01/IMS~|~SFN 4807952~|~~|~4D013FC53BE70DE6DC2FB5C025EB6062DE59CB37 103257~|~1~|~1~|~01/NFA~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~F086B1B90EA9ED716A448C53B683D14B6EF6CB7D 103257~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~722709E474A09E02FAC89EB523AA6A95122E4E6D 124262~|~1~|~1~|~01/S50~|~All work included in this plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~C198F9A701BE7A4C61B03581FCFE1636C7038624 99579~|~1~|~1~|~01/MPO~|~Resurfacing Western Reserve Road (CR-32) from Hitchcock Road to Tippecanoe Road.~|~05 - 4R Maintenance - Resurfacing~|~2E23634C8C5167CCCAED17DFA4114F78CB1E8908 88761~|~1~|~2~|~02/BRO~|~Bridge Repair~|~13 - Bridge Rehabilitation~|~2E4B6F6F929D78FA9865FF97842FE51715DD58D0 88761~|~1~|~1~|~01/STR~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~7DEF1AE8B57E978449A76075C2154FF5D7E64DD9 122318~|~1~|~1~|~01/BRO~|~Plan split to program project, updated when scope of work is complete.~|~10 - Bridge Replacement~|~952371BDB72BFA72094EB30093345E37F5EA95CA 88561~|~1~|~1~|~01/STR~|~OC 99999 - SR 66 SLM 3.21 to 4.36 - Overlay with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~5B54330DD3860FBCDF203E7FD893FC537D8B6773 88561~|~1~|~2~|~02/S>2~|~OC 99759 - SR 66 SLM 2.49 to 3.21 - Overaly with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~0104AA0767284487A3EB65ED95DCAC101199DE42 88561~|~1~|~3~|~03/S<2~|~OM 99759 - SR 66 SLM 1.51 to 2.49 - Overlay with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~D329146A35F3DB23CB8ECDB291A8A1DA12064981 88561~|~1~|~5~|~05/STR~|~OM 99999 - SR 48 SLM 4.49 to 5.29 - Overlay with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~7A63D4743FFD3BC5AE54C52BD2BEC7130072917A 88561~|~1~|~4~|~04/NHS~|~NM 22528 - SR 48 SLM 3.58 to 4.26 - Overlay with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~7C5F9656E8B6824D2DBC19D194F85DDACC719182 88561~|~1~|~6~|~06/S<2~|~OM 22528 - SR 48 SLM 4.26 to 4.49 - Overlay with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~D34287FE711910FC535AFA3649A2C6FC0FA2CED8 116945~|~1~|~2~|~02/STR~|~Bridge work to be included with AC Overlay project~|~47 - Bridge Preventive Maintenance~|~A46A67C86400CB3ECBE70713E7093BF7B3645F70 116945~|~1~|~1~|~01/STR~|~AC Overlay w/ RepairsASD-604-0.00 to 3.378~|~05 - 4R Maintenance - Resurfacing~|~48B1F0EDBB03EC17CCCA1913D4474C2CE933F02B 116945~|~1~|~3~|~03/IMS~|~Expansion Joint repair and deck grinding for SFN 0306126~|~47 - Bridge Preventive Maintenance~|~04A2A30E00E4D5CB35145B16450F9B786143D7FE 87586~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Cracksealing portions of Cos-USR 36-(19.71-33.59), and Kno-SR 13-(16.05-20.74).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6BAFF49842AA6C5CA01CC3B862E287DDDE880527 87586~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Crack Sealing portions of Cos-SR 651-(00.00-02.84), Cos-SR 651-(02.84-03.04), Gue-USR 40-(16.19-16.62), Gue-SR 285-(04.51-07.92), Gue-SR 313-(09.91-21.02), Hol-SR 651-(00.00-00.50), Kno-SR 95-(00.00-05.69), Nob-SR 313-(00.00-01.24)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C9259FFEE0B5593283201971A5DB17752AA41C48 87586~|~1~|~3~|~03/NFA~|~"03/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Crack Sealing potions of Cos-SR 643-(00.00-10.87), Gue-SR 285-(08.35-13.46), and Gue-SR 313-(02.23-09.91)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EDBCA65AAD18C7C58288DBD6E55CF65E00E55FAF 115597~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~C4BCFA460734FB7030B62F4501CC41606CB2ABB8 100079~|~1~|~3~|~03/NFA~|~Paved Invert of a Culvert on Home Road for City of Mansfield.~|~04 - Reconstruction - No Added Capacity~|~15D2245B4A0091A740B331D90D9C4D18109A03A1 100079~|~1~|~4~|~04/NFA~|~City of Ontario Paved invert for a Culvert under Home Road.~|~04 - Reconstruction - No Added Capacity~|~43B4F55B607AC6817A19F1CADCE5B21968CB9B0C 100079~|~1~|~1~|~01/S<2~|~RIC US 0042-16.32Minor RehabilitationCulvert invert repair (120)~|~13 - Bridge Rehabilitation~|~18A08BE4EC9F3044F82E6253D2C100980523E798 100079~|~1~|~2~|~02/S<2~|~RIC SR 0430 02.18 SFN (7006098) and RIC SR 0430 05.35Minor Rehabilitation~|~04 - Reconstruction - No Added Capacity~|~78B4BB03B6CF0B587CA5CA517167463B47B89551 96394~|~1~|~1~|~01/NFA~|~Pedestrian improvements and intersection and signal upgrades at three intersections near the Howland Middle School. Trumbull County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~664897DE6581C316E40A0E0E36EEE079591F776F 92877~|~1~|~2~|~02/BRF/LON~|~100% London cost for relocating water line~|~10 - Bridge Replacement~|~16E6A9F1222AE36CBC2BC35DE0FB874EE8AE96D2 92877~|~1~|~1~|~01/BRF~|~BR eligible federal/local bridge replacement in LondonSFN 4960726, Toland St over Oak Run01/BRF/BR/~|~10 - Bridge Replacement~|~3B15592798E387049DCE83E955E3EA2CEC28F500 109569~|~1~|~1~|~01/NHS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for SR 7, SR 11 and US 30 in Columbiana County.~|~21 - Safety~|~7E45DA10656211E43AE8471E17680D9C36B2B1D3 109569~|~1~|~2~|~02/IMS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for IR 77 in Tuscarawas County.~|~21 - Safety~|~649842A7BDE6C7E7D81585BED01A6E52D0D5E9AB 109650~|~1~|~1~|~01/NHS~|~Resurfacing BEL-7~|~05 - 4R Maintenance - Resurfacing~|~25D8745A1C5EA41F20E7C0CD83ECF446C73343A3 109650~|~1~|~2~|~02/STR~|~Resurfacing SR 148 in Powhatan Point~|~05 - 4R Maintenance - Resurfacing~|~CD82D8E536E7619A60E9BDC4B73BFD73200291EE 124968~|~1~|~1~|~01/NFP~|~Provide mowing and litter pick up on various routes~|~99 - State Preventative Maintenance~|~96AC7B129454E071E78B29FAF79A922120470FF0 90892~|~1~|~1~|~01/NHS~|~District Allocation 80/20~|~05 - 4R Maintenance - Resurfacing~|~DCE7A93437B694D7E6957083AFADD0C44F9156A4 124715~|~1~|~1~|~01/IMS~|~Plan split for rehabilitation of federally eligible interstate bridge~|~13 - Bridge Rehabilitation~|~3619F8870055ACA4EE21ECD4427EBB028AACA430 85393~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~0C82860BB62F2F9594055E3ED21EE7608757C256 85393~|~1~|~2~|~02/MPO~|~Improve pedestrian and bicycle safety by providing sidewalk bump-outs and crosswalk enhancements utilizing MPO STP @ 80% federal participation with 20% TRC.~|~21 - Safety~|~ED85A663432DBCB9C5688F1523FF4C715A440F75 85393~|~1~|~3~|~03/NFP~|~Work items that is not eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~5C27033BE9432F7384C9A4D273B7729B05F9F388 82913~|~1~|~2~|~02/STR~|~Minor Bridge work on SFN 6701663 POR-SR 44-21.98 over the Cuyahoga River, not BR eligible.~|~13 - Bridge Rehabilitation~|~38A04EB092CF10E93F26003A9AB0FCA568F11282 82913~|~1~|~1~|~01/STR~|~Resurfacing of State Route 44 from SLM 19.16 to SLM 22.14 in Shalersville Township and the Village of Mantua, Portage County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~5ABE79C1157E04D5CF73C38610CEE1C886A92531 82913~|~3~|~5~|~05/ENH~|~Installation of sidewalks on West side of State Route 44, in the Village of Mantua, Portage County, Ohio.~|~28 - Facilities for Pedestrians & Bicycles~|~6516F8B97711650C2A92384319CF1634EA51A32B 82913~|~2~|~4~|~04/STR~|~Plan Split for the relocation of sanitary line.~|~43 - Utilities~|~C85B3A11B26209F06DA8D4C0AEA0C6EDD99C3BFB 82913~|~2~|~3~|~03/BRO~|~Replacement of SFN 6701620 POR-SR 44-21.80 over a branch of the Cuyahoga River, in the Village of Mantua, Portage County, Ohio.~|~10 - Bridge Replacement~|~E1303E8A7605CF56441F5A39440AB9783C659AB8 104623~|~1~|~1~|~01/SAF~|~All work to construct roundabout to station 241+18.53 except surface course and culverts~|~21 - Safety~|~66F9D6116C2D9A413E9669203331D96217BFD359 104623~|~1~|~2~|~02/STR~|~All work north of station 241+18.43 except culvert, plus surface course on entire project~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB14264ACCD8E3B26D65D310F00D93C4C7B559DC 104623~|~1~|~3~|~03/STR~|~Replace two culverts at DEL-61-0474 and DEL-61-0493~|~04 - Reconstruction - No Added Capacity~|~5D3E93E811318D840FE6A0E45AAA029705C69245 79864~|~1~|~3~|~03/S>2~|~Replacement and widening of sfn# 5004888, MAH-224-19.80 structure over Yellow Creek.~|~13 - Bridge Rehabilitation~|~2D82801FBD80ADF29766C8FB0DFF531C6958CFE3 79864~|~1~|~1~|~01/BRO~|~Replacement and widening of sfn#5004853. MAH-US224-19.65 over IR-680.~|~13 - Bridge Rehabilitation~|~412DF3F4F86855A4C3BAF9013D90622E65EE382D 79864~|~1~|~2~|~02/S>2~|~Resurfacing of US-224 from slm 19.50 to 20.00.~|~05 - 4R Maintenance - Resurfacing~|~46C4E1240D0D4B483AF0BB09B2D4B0C41CFADFB1 124393~|~1~|~1~|~01/S5K/COSH~|~Improvement to pedestrian facilities.~|~28 - Facilities for Pedestrians & Bicycles~|~ACF40DA5719B8D6DE3211973B15A859EBC06A710 112224~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract at various locations~|~44 - Other~|~B61DE7B6C0E4463080FCC9C9B3079ED439B60962 107596~|~1~|~1~|~01/NFA~|~Intersection improvement SR 164/Esterly Drive; 100% ORDC federal funds up to cap.~|~~|~8C9087EB992243C1C885B2E944700372117863E0 79664~|~1~|~2~|~02/NHS~|~Patching & sealing on 14 structures (not BR eligible):~|~13 - Bridge Rehabilitation~|~2E8CDB3EC72A658371D7B4834C682B9D6F693BA4 79664~|~1~|~1~|~01/NHS~|~Priority system resurfacing from Little Turtle Way to Blacklick Creek~|~05 - 4R Maintenance - Resurfacing~|~E2CD48C62E10F3AFE05F27962BE4412C7D5452A3 91919~|~1~|~2~|~02/SAF~|~Signal & Cabinet Upgrades with D6 state preservation funding~|~21 - Safety~|~29EF5BCE9D223871615C6CA9AD0FB7B911DF092C 91919~|~1~|~3~|~03/SAF~|~100% 4BC7 safety funding for signal heads and detection for PIC-23/Dupont intersection~|~21 - Safety~|~5EB864C925A49FFE808608C85229EC8964F63BFD 91919~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. funds for 1 year Electric Maintenance Contract~|~21 - Safety~|~6F6D996C7DF875272551B1E597D143B0FD7F0BAF 97711~|~1~|~1~|~01/S<2~|~Replacement of SFN 0460664 North Avenue Bridge over Cowles Creek in the City of Geneva.~|~13 - Bridge Rehabilitation~|~1CF332CD484ACE68204836924811A527664A30D0 118866~|~1~|~1~|~01/STR~|~All items of work from SLM 0.30 to 6.82~|~05 - 4R Maintenance - Resurfacing~|~5F16BE27FCDA30539D4B039888A0ADBC59CD0E4D 118866~|~1~|~2~|~02/S5K~|~All items located in SLM 6.816 to 7.59. ~|~05 - 4R Maintenance - Resurfacing~|~8E3CE37591DD03EE36541F3642B306CE22DCC14B 97649~|~1~|~1~|~01/BRF~|~4860187~|~10 - Bridge Replacement~|~2C8B8270DBD0355377820F906B0DD55FB2E0FCF2 97649~|~1~|~2~|~02/NFP~|~This split is for the relocation of the 2 waterlines.~|~10 - Bridge Replacement~|~C64D9003331573B7FCB583A90D15A56149ACBDD5 107577~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement project for FY2024. 80/20% Federal/State funds.~|~21 - Safety~|~7ADBB1AD5E0F0C096606902CAB70F787644A8539 107577~|~1~|~3~|~03/NHS~|~Guardrail upgrade/replacement project for FY2024. 80/20% Federal/State funds.~|~21 - Safety~|~D6533FDB57E2364E27C1EF30F4770FDA92DCFFD3 107577~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement project for FY2024. 100% State funds.~|~21 - Safety~|~CF34494633581E37EF6FE645D24E60FC845EA0E9 107577~|~1~|~1~|~01/S5K~|~General System Guardrail replacement project for FY2024. 80/20% Federal/State funds.~|~21 - Safety~|~65EED40339CF96E4DFFC9315453B8021F90467BF 117826~|~1~|~2~|~02/STR~|~Split for bridge work on the rural STP system~|~13 - Bridge Rehabilitation~|~C5886C6ACAD76183CF048DA45C6D457E00C9F6BE 117826~|~1~|~3~|~03/S>2~|~Split for bridge work on the urban STP system~|~13 - Bridge Rehabilitation~|~247C831CC89995CF7BEB6FD1E0DE9BBA6689A45B 117826~|~1~|~1~|~01/NHS~|~Split for work on bridge rehabilitation on interstate bridges~|~13 - Bridge Rehabilitation~|~DFEE5A242D6F8CDCCFA18605CF84E9F91ED28004 103664~|~1~|~1~|~01/NFA~|~Plan split~|~13 - Bridge Rehabilitation~|~977541BBBFBADC6E8FA6281A2075C9DA793F85B5 109260~|~1~|~1~|~01/NFP~|~Crack sealing of various routes throughout the district.~|~99 - State Preventative Maintenance~|~DF05E35D29FB9BDC5B0C2AE1DCD5F43D4950E9A9 106724~|~1~|~1~|~01/BRF~|~Replacement of the existing King Avenue bridge over the Little Miami River, upstream from the existing WAR-CR 282-0.97 structure. Improvement to the approach roadway including grade separating the approach roadway from the Little Miami Scenic Trail crossing.~|~10 - Bridge Replacement~|~4C7B124B3CA8FFE310F05A9CDDC321A3AEB773FE 106724~|~1~|~2~|~02/NFP/UTIL~|~Plan split is for waterworks and sanitary sewer improvements, being funded 100% by the utility companies.~|~43 - Utilities~|~2F8B1A8D21BD2505109DFDFD2A7A645A5C45255D 96500~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/OT/CAMB" SRTS City of Cambridge project for installation of sidewalk. Fund $160,000~|~17 - Construction Engineering~|~F3950A06B248C93B438CBB89020BE9CE7FFE3E23 84587~|~1~|~1~|~01/NHS~|~Bridge Maintenance~|~13 - Bridge Rehabilitation~|~1BD6B133349737FFBB2961061C89AFEEBBC6A02A 88614~|~1~|~1~|~01/S<2~|~Replace bridge (not eligible for BR replacement funds):SFN 800360, UNI-31-0.23, Mill Ck~|~10 - Bridge Replacement~|~945F6471993A0AF06FE25CFD2585EA781364C8B4 96211~|~1~|~1~|~01/STR~|~Replace structure over Sylvester Run~|~10 - Bridge Replacement~|~FAD6EB55FB6FA6E322E5C72B6FC53997E6D25FCB 76147~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project. ATH 682 2.15-2.97, 4.72-5.89, and ATH 691 8.78 -8.92 with a fine graded polymer treatment. ATH 682 2.97-4.72, 5.89-6.14 with an asphalt overlay treatment. Funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~05E23DAC6BE32A16FBB32F59C2A703F90FDAC8ED 76147~|~1~|~2~|~02/STR~|~Two-lane resurfacing project. ATH 691 3.43-8.78 with a fine graded polymer treatment. ATH 691 0.00-3.43 with an asphalt overlay treatment. Funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2EC69C2F08D092E9A5AB6B82FCAF1E07438D88AB 102684~|~1~|~1~|~01/NFP~|~All work in this project.~|~01 - New Construction~|~7005397A1C0D9D469F94DBDE375D5311F68ACE09 97972~|~1~|~1~|~01/BRO~|~Rehabilitation of Bridge COL-30-3004 (SFN 1502166) over US 30, by replacing deck, painting steel and repairing Pier columns.~|~13 - Bridge Rehabilitation~|~EFDB948AB99F262B658929B1546B4EFD090F10F1 119770~|~1~|~1~|~01/STR~|~Replacement of existing structure (KNO-62-19.08)~|~10 - Bridge Replacement~|~0E4B169BFB674CCE97F12EEBDE6F9FE91311C0AB 117239~|~1~|~1~|~01/S>2~|~Subgrade and base roadway~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B2E757EA93E8228550531A01FFC05AF25787C8AB 117239~|~1~|~2~|~02/S>2~|~Surface pavement course~|~04 - Reconstruction - No Added Capacity~|~48374FE58CFA4EAAEDB8417B44E7B6C519AC686E 87616~|~1~|~2~|~02/NFA~|~100% local funding for all work not eligible for the earmark.~|~~|~14C995A242BF1AC8CB1A56ECD4C6E59F107F9962 87616~|~1~|~1~|~01/ERD~|~o OH392 is for the construction of the pedestrian bridge onlyo OH175 is for the construction and extension of multipurpose trails throughout Lake County (which includes the construction of a pedestrian bridge).~|~~|~F4F41E98232F9189822EF89F24F1CF8CFB3A5912 100351~|~1~|~2~|~02/S<2~|~Overlay SR 47 in Darke County with fine graded aggregate.SR 47 SLM 0.79 - 1.65~|~05 - 4R Maintenance - Resurfacing~|~005F0F5222DE84A7209BB64482E310276812EF3A 100351~|~1~|~1~|~01/STR~|~Overlay USR 36 and SR 47 in Darke County with fine graded aggregate.USR 36 SLM 0.00 - 3.35 and 3.63 -8.35SR 47 SLM 1.65 - 10.07SR 47 SLM 10.51 - 11.05~|~05 - 4R Maintenance - Resurfacing~|~3BCD8570E906A4D07ADF435873CF50C5023A9E0F 98078~|~1~|~1~|~01/MPO~|~Widen CR 281 (Trimble Rd) from CR 134 (Cook) to CR 146 (Marion) from 2 lanes to 4/5 lanes.~|~03 - Reconstruction - Added Capacity~|~CB52B2B2F924B8A2386A0DD38D4359EBC5686D9A 98078~|~1~|~2~|~02/SAF/Mans~|~90/10 Safety items at intersections.~|~03 - Reconstruction - Added Capacity~|~2D1898A07CBCFE0E366CC7C4ACC4A5CD0C84D64B 107565~|~1~|~1~|~01/NFP~|~Maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~5035ED51A36EA0AACE9BB7A3E8D9AF618309D72D 96356~|~1~|~1~|~01/SAF~|~Provide shared use path along Upper Bellbrook from Feedwire to Kable's Mill. Improve existing PED connection from Rose Lake Drive to the Bellbrook school campus.~|~~|~EB13E2DCA7BBF2F2E7827D3B243D934E433FEF97 91012~|~1~|~1~|~01/BRF~|~Anderson Morris CR46 SFN 7837658 0.92-0.93 over squaw creek~|~10 - Bridge Replacement~|~2ACD37D6DE21EA3E2AC6EFF9F50E55221B47BCD4 107708~|~1~|~2~|~02/STR~|~Plan split for FUL-2-0506 replacement~|~04 - Reconstruction - No Added Capacity~|~CFC04D83F742D1E8A701FEEC1D4B2D9D39E9C966 107708~|~1~|~1~|~01/STR~|~Plan split for resurfacing of SR 2, SR 66~|~05 - 4R Maintenance - Resurfacing~|~CEB39224A45D665BBBD557B7E278FAAFBCD8513A 115305~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~39AE1EE756C807964D769FD6E6CFB73F5423ECE1 14821~|~1~|~1~|~01/MPO~|~City of Brunswick~|~04 - Reconstruction - No Added Capacity~|~D2BD707801CAB74D23D9777498B9B99CF914CAE6 14821~|~1~|~2~|~02/ENH~|~100% Local Funded items~|~04 - Reconstruction - No Added Capacity~|~844D2EA312C4F6B87787C29A9D39E0492981ED34 99796~|~1~|~1~|~01/NFP~|~Replacing the following culverts; CFN 045310360 ATB-531-12.41 and CFN 045340130 ATB-534-04.64~|~~|~506AD4A6C6386BC87411DB53D105D44C12B8E232 112702~|~1~|~1~|~01/NHS~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for US 250 in Tuscarawas county.~|~21 - Safety~|~FCBC8BE92D1C30D95EE8E50D4C89BE74690457DC 112702~|~1~|~2~|~02/S<2~|~Upgrade the existing guide, regulatory, and warning signs along mainline and the lead-in signing at the interchanges for US 36 in Tuscarawas County.~|~21 - Safety~|~6F6DA9FCC22C6682DAE4D91AB9E2690D36DAA8CA 116539~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing, includes alternate bid items.~|~05 - 4R Maintenance - Resurfacing~|~DF378EF24B16731DEA96AC1F2195A70D498FF031 93757~|~1~|~1~|~01/STR~|~01/STR/BR/ ; PUT-694-0872, SFN 6902049; 100% State funds - No Cap.~|~~|~7FCEAFA27519D01881ACA06B6F3439D0597C7197 117712~|~1~|~1~|~01/SAF~|~Plan split for safety~|~04 - Reconstruction - No Added Capacity~|~0E1866FCE5E7D621CF153B8D756C07DDB76B0373 117712~|~1~|~3~|~03/BRO~|~Plan split for aesthetic enhancements for HEN-24-0043 bridge. 100% local participation.~|~08 - Bridge - New Construction~|~56163BEB4EF31ED729D633D61D7F5B2020D1703D 117712~|~1~|~2~|~02/BRO~|~Plan split for new HEN-00024-0043 bridge~|~08 - Bridge - New Construction~|~D6BAECC45842382807EF81A462329E655C56ABB9 117712~|~1~|~4~|~04/STR~|~Plan split for paving connector road~|~04 - Reconstruction - No Added Capacity~|~FE8646E0A2E91B13A31E671ECE500CAA581000A2 104707~|~1~|~1~|~01/NHS~|~Bridge painting project. MEG 7 2.43 (SFN 5300037) and MEG 7 2.63 (SFN 5300061). NHS route funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~795048562E928EE820F7446130FCC1054D011D29 104707~|~1~|~2~|~02/STR~|~Bridge painting project. MEG 124 47.86 (SFN 5301718). Rural other federal aid funded 80 federal/20 state.~|~47 - Bridge Preventive Maintenance~|~20C898D34F217F10A87A895E6263B02DC6F6AFA5 113815~|~1~|~1~|~01/STR~|~Major Rehabilitation Funds - 5MT7 (80% Federal) / 4MT7 (20% State) - No CAP - FDR Rehabilitation with related work on: 1) COS-SR 229-0.00 to 0.70; 2) KNO SR 229 14.41 to 25.38~|~04 - Reconstruction - No Added Capacity~|~498EE1CDF6A2A90DA14BDDC3C01C9306D4777A51 113815~|~1~|~2~|~02/SAF~|~Safety Funds - 4HJ7 (90% Federal) / 4BC7 (10% State).~|~21 - Safety~|~49B318156CA6F4E8787FD7C619FDEF2577D9CE50 120480~|~1~|~1~|~01/NFA/AKRO~|~Bridge replacement.~|~10 - Bridge Replacement~|~65D3D4C4D2627AA5ACFD338039E3D809E4EF2C7C 120480~|~1~|~2~|~02/NFA/AKRO~|~Installation of sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~D4FCE4D9940B6AEEBF208B5D30E3D2DB84A94B41 114326~|~1~|~1~|~01/MPO~|~Construction of bike facilities on Central Parkway from Marshall to Ludlow.~|~28 - Facilities for Pedestrians & Bicycles~|~FCC88D9273A47A469C4FD84116C825014EDB1FB2 86276~|~1~|~3~|~03/S<2~|~General System - Urbanized Area - 80/20 4PF7/4PS7~|~05 - 4R Maintenance - Resurfacing~|~235A7B7659A0B0BACD7816B8B61BD57B8C453C34 86276~|~1~|~2~|~02/S<2/LOR~|~City of Lorain Urban Paving - 100% City Responsibilty~|~05 - 4R Maintenance - Resurfacing~|~BF61664408326034199A0B66C5D06908ED72E496 86276~|~1~|~1~|~01/S<2/LOR~|~City of Lorain Urban Paving - 80/20 4PF7/4BG7~|~05 - 4R Maintenance - Resurfacing~|~C0183926CD6603DD108A4F191FBB2180430A0E3E 105491~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the Superstructure and Pier repair on SFN 6001653, Mus-SR 60-07.62~|~13 - Bridge Rehabilitation~|~A6C727687DD99A2EF3C734BFFBCC8E114549F1A4 114414~|~1~|~2~|~02/S5K~|~Resurfacing inside the Ottawa Glandorf Urban Area but outside of the villages. Work on CR Old US 224 from 1.181 to 1.744. 80% federal funds from CEAO with the 20% match provided by Putnam County. After the cap is reached the funds will be provided 100% by Putnam County.~|~05 - 4R Maintenance - Resurfacing~|~C9DB42A6AA35DD002C5CADAD96156E8242A301CB 114414~|~1~|~1~|~01/STR~|~Resurfacing outside of the Ottawa Glandorf Urban Area. All work on CR Z. 80% federal funds from CEAO with the 20% match provided by Putnam County. After the cap is reached the funds will be provided 100% by Putnam County. Some work is in the Village of Columbus Grove. The County will pay for the project and then bill the Village for their portion.~|~05 - 4R Maintenance - Resurfacing~|~8BF0BA7531A4E3B14F13502B92641F8C3A2B22C5 114414~|~1~|~3~|~03/NFA~|~Resurfacing outside of the Ottawa Glandorf Urban Area on CR Old US 224 from 1.744 to 4.106. 80% federal funds from CEAO with the 20% match provided by Putnam County. After the cap is reached the funds will be provided 100% by Putnam County. Some work is in the Village of Columbus Grove. The County will pay for the project and then bill the Village for their portion. Rural Minor Collector.~|~05 - 4R Maintenance - Resurfacing~|~8462BB1A2021D6B901338B4E9F2973CAD5BF7C6A 110460~|~1~|~1~|~01/SAE~|~Improve sight distance on SR-177 by improving the vertical curves on northbound and southbound SR-177 approaching the Oxford Germantown intersection.~|~21 - Safety~|~E27FA6F30C05178469BDC6BEC874C3A7FA9BA174 120369~|~1~|~1~|~01/BRF~|~Replacement of existing deteriorated superstructure on WAR 147 Grog Run Road SFN 8333076~|~10 - Bridge Replacement~|~B737C2EBF6FD7F78D943929FAE3E8B545B3B3AA0 98833~|~1~|~1~|~01/IMS~|~Split for lighting upgrade~|~44 - Other~|~35483516894DE037F873EC76C09623BF673252C3 98833~|~1~|~2~|~02/NHS~|~Work on US-422~|~44 - Other~|~06A862014F569F9FC39A12230366443C4BB1011C 123941~|~1~|~1~|~01/MPO~|~Plan split for federally eligible NOACA Carbon Reduction Program funded work items.~|~21 - Safety~|~1F00DCFA296D64600E8A19E67172C57D365EB8A6 94123~|~1~|~5~|~05/S>2~|~Resurfacing of SUM SR 585 from 0.00 to 1.28 and WAY SR 585 from 18.47 to 18.63.~|~05 - 4R Maintenance - Resurfacing~|~0266046975B20753F40A141F8F4250B877BB1EFC 94123~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~5681EF7A0DB1BF45DAE7E783255F86CDB2CAF44B 94123~|~1~|~2~|~02/NHS~|~Resurfacing of SUM SR 21 from 0.00 to 5.14.~|~05 - 4R Maintenance - Resurfacing~|~316C51D7697B60983664D077A568C35875F0AFB5 94123~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~7BF575F142DBCF61B22F5A8DC0EEDA1116996C52 94123~|~1~|~4~|~04/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~D70C95C9AB0669509DC1F8D9B92716AB38F0E2E9 94123~|~1~|~6~|~06/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~11A2615C713779241943C27D1CB16DF877165C7A 94123~|~2~|~7~|~07/SAF~|~Installation of RCUT on WAY/SUM SR 585 and Eastern Rd.~|~21 - Safety~|~DD40694CE062A7EE7BF40AD1D28692A1CF71F38B 106433~|~1~|~2~|~02/S<2/CAMB~|~Transportation Alternative Funding 4B37 (80% Federal) / LNTP (20% Federal - See CAP Comment - Gue CR 503 00.00 to 00.72 Stuebenville Avenue from N 5th Street to Highland Avenue: sidewalks, ADA Ramps; Decorative lighting.~|~04 - Reconstruction - No Added Capacity~|~78B9E0EBB2E7B7CF4D4A8224A6A89B56DA703A5C 106433~|~1~|~1~|~01/S<2/CAMB~|~City of Cambridge Small City Program funding - 4B97 (80% Federal) / LNTP (20% Local) - See CAP Comment - Reconstruction of Gue CR 503 00.00 to 00.72 (Steubenville Avenue)~|~04 - Reconstruction - No Added Capacity~|~6010347E1AB46A3125B3AEDFE9AA9674084090DD 99853~|~1~|~1~|~01/MPO~|~Replacement of SFN 7631928 Gambrinus Ave SW bridge over the Wheeling & Lake Erie RR and Hurford Run.~|~10 - Bridge Replacement~|~558356D3A4C301FA129724D8ED3A075534D33B99 95604~|~1~|~1~|~01/NHS~|~JAC US 35 8.35-11.00~|~05 - 4R Maintenance - Resurfacing~|~726BAAEA97A033F8BC430E56D08A171248D66343 121594~|~1~|~1~|~01/MPO/BARB~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~FBC445290D952046B0AE31EEB149C09D767C5011 121047~|~1~|~1~|~01/S>2~|~bridge overlay plan split.~|~47 - Bridge Preventive Maintenance~|~515C66161A9D73336F9D6AB42444CBED5DCC70C6 101153~|~1~|~1~|~01/STR~|~Smooth seal on rural route: DAR SR 49 SLM 19.03 to 23.28~|~05 - 4R Maintenance - Resurfacing~|~6188B88AF4D96728236AF80C271C0A1EC6D679DE 101153~|~1~|~2~|~02/S<2~|~Smooth seal on small urban route: DAR SR 49 SLM 18.38 to 19.03.~|~05 - 4R Maintenance - Resurfacing~|~714787A00449BB02CA2C9F4D7674738B800227E2 101153~|~1~|~3~|~03/NHS~|~AC Overlay with repairs:DAR SR 49 SLM 12.22 to 15.25~|~05 - 4R Maintenance - Resurfacing~|~A93DC3CB364BF714F17C9B60ADBA466110DD3C95 114355~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funding - 4PS7 (1000% State) - NO CAP - Annual Project for the Application of Epoxy Pavement Markings District Wide.~|~21 - Safety~|~6780EEB1F1FFE8570F95ED91A74537C3E3B909A6 116997~|~1~|~1~|~01/NHS~|~test~|~04 - Reconstruction - No Added Capacity~|~E9064523F10B030D967C597CB2C607E42A4584BB 97204~|~1~|~1~|~01/ENH~|~Construction of a five foot concrete sidewalk on the south/west side of Yankee Road from Cincinnati Dayton Road to tie into the existing concrete walk installed by Royal Redeemer Lutheran Church. New walk will continue on the south side of Dutchland Parkway from Yankee Road to the existing crosswalk at Dutchview Court (between the Liberty Junior High School and Woodland Elementary School).~|~28 - Facilities for Pedestrians & Bicycles~|~4C56709420689F92E32CB48245A80E36577996DB 124096~|~1~|~1~|~01/IMS~|~Plan split to perform geotechnical stabilization of a landslide along the interstate~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7FF948778969B903B019453FB3E55F99A75A2610 109480~|~1~|~1~|~01/S>2~|~Trail maintenance~|~28 - Facilities for Pedestrians & Bicycles~|~B5EC148534A23047301BD1AE38F4B1637FF2E957 108891~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~0463AB051894F39A1701A10F2B88AA5DCD5DE6DE 90950~|~1~|~1~|~01/NHS~|~Bridge Repair: HUR-18-25.15~|~13 - Bridge Rehabilitation~|~2614F6F7BF88718CD0E59283E3E7E66332B32D3F 90950~|~1~|~2~|~02/STR~|~Misc. Bridge Repairs: HUR-162-9.80 / HUR-162-9.90~|~13 - Bridge Rehabilitation~|~F70C1D0A7203EA7DE6E84760D9866CE17F14599A 95908~|~1~|~1~|~01/STR~|~Bridge deck replacement project. GAL 77 0930 (SFN 2704684). Work includes steel beam repair and bridge painting. Other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~6AE88B257B50D469BFAB873E1CF3EA8917AF31BA 102953~|~1~|~1~|~01/S>2~|~STP > 200000 eligible.~|~13 - Bridge Rehabilitation~|~20E9DA8A680F80ABC5734B39CCDA643825661193 77813~|~1~|~1~|~01/NHS~|~Overlay and perform minor maintenance of Bridge Nos. HAM-22-0091 R, SFN 3100766, and HAM-22D-0007 L, SFN: 3100294.~|~13 - Bridge Rehabilitation~|~4F553AFA85A0F6136BEECA4307136252FCD79FD0 125942~|~1~|~1~|~01/BRO~|~Bridge Deck Sealing throughout Carroll, Harrison, Holmes and Tuscarawas counties.~|~47 - Bridge Preventive Maintenance~|~95B4E00AC6827094E4DD810BC3D574727E8321FB 109735~|~1~|~1~|~01/S>2~|~Plan split for work on HAM-22~|~05 - 4R Maintenance - Resurfacing~|~0FDF294CE843C42EC4979EBA95C8E4E4500A037A 108525~|~1~|~1~|~01/BRO~|~Replace existing non-composite box beam superstructure with new composite box beam superstructure for HOL-83-1197 (SFN 3801772). Replace beam seats and bearings. Provide new approach slabs.~|~13 - Bridge Rehabilitation~|~43A8189DB04834847B64A2F7FBE8D8E70E8E08B9 94390~|~1~|~3~|~03/IMS~|~Bridge Work (interstate):SFN 0305278 ASD-71-13.68~|~47 - Bridge Preventive Maintenance~|~2B655AADFE52CEC3F115F546CE4263947DB62D7A 94390~|~1~|~1~|~01/STR~|~General System Resurfacing - Rural~|~05 - 4R Maintenance - Resurfacing~|~6325390C71E3C17BDDCB226BBFB7113ED547E837 94390~|~1~|~2~|~02/STR~|~Bridge work (stp rural):SFN 0305200 ASD-302-0.89SFN 0305235 ASD-302-1.53SFN 0305294 ASD-302-5.63SFN 0305340 ASD-302-9.34SFN 0305405 ASD-302-14.39~|~47 - Bridge Preventive Maintenance~|~A7C194981801CC7D7A01945374545FAF31A66704 117368~|~1~|~1~|~01/BRF~|~Added plan split.~|~10 - Bridge Replacement~|~10DB0E3981A01D366F05694271160F740E9B30D3 100506~|~1~|~1~|~01/STR~|~Resurfacing HOL-60 from Killbuck to SR 39, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~80FB7E543110045CCC17A8A77C4B14AB085552D9 123720~|~1~|~1~|~01/IMS~|~Plan split for resurfacing interstate~|~05 - 4R Maintenance - Resurfacing~|~6461A8167696847463CA37CC6D27D0F494A51A3E 122731~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~04 - Reconstruction - No Added Capacity~|~68886F07F32102F8C8CD376DC7D19A59F9424C27 122731~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded scope, such as any work on Convent Blvd that is not necessary for the construction of the roundabout.~|~17 - Construction Engineering~|~AFB87173554A40524CDAF90F479C3EC1F4489A98 121260~|~1~|~1~|~01/S>2~|~Resurfacing STP >200,000~|~05 - 4R Maintenance - Resurfacing~|~3178E5971A72D2D3E79FC5CB99BF4FF848E23168 121260~|~1~|~2~|~02/STR~|~Resurfacing STP Rural~|~05 - 4R Maintenance - Resurfacing~|~4C67385707E34A5B5848C16003FA6514E73646B3 94814~|~1~|~1~|~01/S<2~|~Reconstruct and resurface Belmont from Mitchell to Home Rd. SLM 01.83 to SLM 02.62 CR 502~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BB383B3B820A30660DC9751FAE1F5277681C500C 108868~|~1~|~1~|~01/STR~|~Bridge Split for San-6-23.58 replacement~|~10 - Bridge Replacement~|~3EFC224DC577A1D392387CB2E611CF5FA1FBC24B 92066~|~1~|~1~|~01/S<2/LANC~|~"01/S<2/OT/LANC" - City of Lancaster intersection improvement project utilizing STP funding through Large City Program.~|~21 - Safety~|~27C54920FA7434AA6489267CF8A79E48925CF587 126944~|~1~|~1~|~01/IMS~|~All work associated with the WAR-71-1514L/R bridges. ~|~13 - Bridge Rehabilitation~|~D379B8575C10754E347A54204A0B957BC87E5C6D 126944~|~1~|~2~|~02/NHS~|~HAM-50-1903 L/R bridges CE funding event.~|~~|~34BB37D5E2DD45D3B120A5CA9610B1345B00781A 110614~|~1~|~1~|~01/S>2~|~Split for paving work on the STP system.~|~05 - 4R Maintenance - Resurfacing~|~AF2D9BB7D1F5E39F92CF62274579376CC7B71523 110614~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~F5A20395EDE165FB3071180ACDC57A81ED88F43F 96410~|~1~|~1~|~01/IMS~|~The location was identified as a wet pavement crash location. Skid testing was completed and milling sections with low skid numbers recommended.~|~~|~8264E19D7773A424EDBA516031A741A9F3E55D9E 92756~|~1~|~1~|~01/NFA~|~CO CC 01 added plan splits. This is maintenance funds (4CP7) 100% state.~|~21 - Safety~|~6C2CE4E5230CE4ECFA5BE305A46F9A9C845633DA 116591~|~1~|~5~|~05/IMS~|~Bridge Rehabilitation for Interstate Bridges - Maintenance FundsSFN: 5203376, 5203406, 5203465, 5203538, 5203554, 5203503, 5203619, 5203589, 5203694, 5203724, 5203783, 5203759, 5203813, 5203848~|~13 - Bridge Rehabilitation~|~8F915867336D5AFCDB3A84C001D992015773A42F 116591~|~1~|~4~|~04/STR~|~Bridge rehabilitation for Other federal Aid bridges, ruralSFN: 2202476~|~13 - Bridge Rehabilitation~|~44C335F0E0031E7ADB60FBCABAA004B5A3BBB887 116591~|~1~|~3~|~03/S5K~|~Bridge rehabilitation for Other federal Aid bridges, 5,000-50,000SFN: 8500754, 8500878~|~13 - Bridge Rehabilitation~|~E17BB1A8FE4A301E4A39A4EE41288105B1B9AA13 116591~|~1~|~2~|~02/S50~|~Bridge rehabilitation for Other federal Aid bridges, 50,000-200,000SFN: 2203243, 2203189~|~13 - Bridge Rehabilitation~|~B330634B492F8D5D2DEFBE78124C20F3747F6C59 116591~|~1~|~1~|~01/NHS~|~Bridge rehabilitation for NHS bridgesSFN: 3900576, 3900576, 3900606, 8500568, 8502013, 8502269, 8502307, 8502285, 8502374, 8504831, 8500606~|~13 - Bridge Rehabilitation~|~D790225C750C5E7423E1F5F201D6EAEF8EE728F8 91889~|~1~|~1~|~01/NHS~|~Resurface and perform pavement repair on SR 4 in Greene County from the Montgomery County line to the Clark County line~|~05 - 4R Maintenance - Resurfacing~|~AE7570FF86A389FDDD710D4D6FC154A8DBFA2E92 90658~|~1~|~1~|~01/MPO~|~resurface Poe Rd in Bowling Green WOO CR78 4.06-6.07~|~05 - 4R Maintenance - Resurfacing~|~FA01E99ED32266CB50E982AC54373A6175F5637B 92272~|~1~|~1~|~01/SAE~|~Apply edgeline and centerline pavement markings to various county routes in Clinton County.~|~21 - Safety~|~5D0AC54DB8EDAC4F0975363E9A24134F48AC2A4E 97505~|~1~|~1~|~01/BRF~|~Bridge replacement of the Ohio Bridge Partnership Program (OBPP). Off the federal aid system. Functional Classification Local.~|~10 - Bridge Replacement~|~747E007672FCF7A8DE8F4EAFEEBDBFBC5D1A5097 91642~|~1~|~1~|~01/STR~|~LAW SR 650 6.40 Slide RepairProject Termini: On SR650, project is 6.40 miles north of its intersection with US52. Project Description: It is proposed to repair the slide under Federal Declaration 2011-02. 100% state 01/STR/OT/State~|~44 - Other~|~068ADE88EF30B9B3C7468DED25CBBDD06A6BAEC2 97844~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 1536974~|~10 - Bridge Replacement~|~DA893CB198BCEE9E6F41220EC47D17451C213946 103978~|~1~|~1~|~01/ENH~|~Construction of sidewalk along Elm Street in the Village of Racine. TAP funded project. Funded 80% federal, 15% credit bridge and 5% local.~|~28 - Facilities for Pedestrians & Bicycles~|~48664F8A2479BC79C55CA52CFA144B71ADDF77EF 107214~|~1~|~1~|~01/NHS~|~Improve intersections of DEL US 36/SR 37 at Lackey Old State Rd (DEL CR 10) and at North Old State Rd/Dunham Rd (DEL-CR 10 & 10A)~|~21 - Safety~|~995F02BC7A4872E87DA8E24D34FA40A71F0B38FE 99671~|~1~|~1~|~01/STR~|~Milling and filling various routes with the county with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~B2FE02FD98DB5902068A677C17C34278362C3501 99671~|~1~|~2~|~02/NFA~|~Milling and filling various routes with the county with asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~DF083E77ADFDE82F4718842B0A3D9E77B9BE4DFB 109379~|~1~|~1~|~01/NFP~|~ODNR funded project at Monroe Lake - Slip Repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F503E3EE5DA018043ACE9805C0C8FD29F7DAA5CE 98756~|~1~|~1~|~01/ENH~|~Rehabilitation of the Lunken Trail including correcting localized drainage issues by modifying existing drainage structures, re-grading drainage ditches, and installing curb and gutter along Wilmer Avenue. In addition, trail approaches to existing concrete driveways will be reconstructed.~|~28 - Facilities for Pedestrians & Bicycles~|~04C92BA8658BB3B486FC3E38FF20E3E884F1459B 88784~|~1~|~1~|~01/NHS~|~Urban Paving - 80/20 - District Allocation/City of Mansfield~|~05 - 4R Maintenance - Resurfacing~|~0A34B9FA5E192A25EF4E48CF5A1DDF1F7D4F40E6 88784~|~1~|~4~|~04/S<2~|~100% City of Mansfield~|~05 - 4R Maintenance - Resurfacing~|~44DA2D83AB6212D8C0BF7E41557E29EDD6F7F882 88784~|~1~|~3~|~03/NHS~|~100% City of Mansfield~|~05 - 4R Maintenance - Resurfacing~|~A26F98B13208108750CDDD5785005D074659DD96 88784~|~1~|~2~|~02/S<2~|~Urban Paving - 80/20 - District Allocation/City of Mansfield~|~05 - 4R Maintenance - Resurfacing~|~E69C60189D672FF939B123B6BBD9ABC8DCC6D5C4 99554~|~1~|~1~|~01/IMS~|~Split for resurfacing work at 90% fed and 10% state~|~05 - 4R Maintenance - Resurfacing~|~EAD2E59D8ACBAACD03DFB78652E54FB9AFE7DE62 102183~|~1~|~1~|~01/NHS~|~Removing southbound slip lane and island to provide standard right turn lane.~|~21 - Safety~|~F177428CE10647545373C9F0D61D4A1717FE2321 94217~|~1~|~1~|~01/S>2~|~Split to include all work associated with Bridge HAM-22-0619 over the Railroad and bridge HAM-22-0622 over SR 562.~|~13 - Bridge Rehabilitation~|~92E5DEDBE467FF820156C2F9E1FC7C2D110697AF 117236~|~1~|~1~|~01/MPO~|~Resurfacing Wabash Cannonball Trail - MPO Transportation Alternatives (Enhancements) funding.~|~28 - Facilities for Pedestrians & Bicycles~|~96EC3BCDD34565B5E0CF086559404F2ACB9A1D92 88400~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal funds~|~13 - Bridge Rehabilitation~|~315731ABF490E0F21F9866697664FAB7ADA5AF7B 122045~|~1~|~1~|~01/SAF~|~Construct roundabout at the intersection of US 42 and SR 29 in Madison County~|~21 - Safety~|~21F7EE70C20AE4AC22B537D8A6FDCE9DB31165D6 98142~|~1~|~1~|~01/BRF~|~SFN 7444125~|~13 - Bridge Rehabilitation~|~1F0EA8A6996CBC9C227E793DDF392ACB2EA9F63C 105085~|~1~|~1~|~01/IMS~|~Bridge replacement with repairs on IR.~|~13 - Bridge Rehabilitation~|~C305E8FBABFC1E19C6C7AC2DBFB109323ED38B6D 97906~|~1~|~1~|~01/CMQ~|~Wolf Creek Bikeway - The project consists of extending the Wolf Creek Trail along the south side of the Wolf Creek to Rosedale Drive. The trail would cross the Rosedale Drive bridge, then extend along the north side of Wolf Creek to Bridge Street to West Riverview Avenue. The trail would then be constructed in the West Riverview Avenue right-of-way to just west of Tennyson Avenue. The trail would then traverse on the street along West Riverview Avenue to Wesleyan Park.~|~28 - Facilities for Pedestrians & Bicycles~|~28A0A1BCCC045F5B0EFEFEB1D5845FC881346DFA 91034~|~1~|~1~|~01/MPO~|~80/20 fed/local funding split for all work using federal MPO STP funds.~|~05 - 4R Maintenance - Resurfacing~|~CC8B0DF631FBD7A85B65D22AE8B78C1DEDE3676E 108378~|~1~|~1~|~01/NFA~|~Landslide repair project. ATH 690 4.46-4.50. Non-Federal Aid Route (ATH_NF_0006). Funded 100% state ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FF357CF72175A7CF4EDE53ABE46E54401CCD36FE 117095~|~1~|~1~|~01/ENH~|~Shared used path in Piketon.~|~28 - Facilities for Pedestrians & Bicycles~|~9395442E00C6ED15D97EC29E63460271DE985249 108133~|~1~|~1~|~01/MPO~|~Resurfacing of East Waterloo Road from Manchester Road to Kelly Avenue in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~A8BF7E180E9C38AD2D3530332AFF00027CCC4C54 125569~|~1~|~1~|~01/BRO~|~Encase piling with structural repairs~|~13 - Bridge Rehabilitation~|~134FCB39E7DD61715E7A556EFD78A0A2E446AB7F 119267~|~1~|~1~|~01/STR~|~Tree stump removal/pruning~|~44 - Other~|~AEA0949F0FFDFEA9A6CBC03433B4DDF01BD41F48 86067~|~1~|~2~|~02/IMS/GAH~|~100% Local - All items associated with aesthetics for the Hamilton Rd Bridge~|~13 - Bridge Rehabilitation~|~764F2A0EE439AD96646DC3B94E1445AA5FD116A7 86067~|~1~|~1~|~01/IMS~|~Rehabilitation of 6 bridges over or under IR270~|~13 - Bridge Rehabilitation~|~BA94E102A5B978557A9CE4F53681BA63290FA4D7 86067~|~1~|~3~|~03/SAF/Gah~|~Additional pavement markings to be paid for by the City of Gahanna~|~21 - Safety~|~98215EFBD9D7F4283C0031CB6709B62B5CB968DA 101088~|~1~|~1~|~01/S<2~|~This plan split is for the small urban route.~|~05 - 4R Maintenance - Resurfacing~|~D5450318C4D101400AC92FDE9B455F7F1401A0D0 101088~|~1~|~2~|~02/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~BDB5CD27F51E802C04FD2856B1D4FCD023DB6BDC 120067~|~1~|~1~|~01/NFA~|~NEVI Round 2 275-B~|~63 - Electric Vehicles & Charging Infrastructure~|~5820C315BCF921A356FADEC976A2BD1101BD129D 106051~|~1~|~1~|~01/NHS~|~Pave culvert invert on GAL 35 15.70. NHS route funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~281AFE8AC8772C8450D42A31924F47914B11D1B7 106051~|~1~|~2~|~02/STR~|~Bridge repair on GAL 233 6.38 (SFN 2703181). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~886165871C23ABA0E4D4CD5317B3FB60C76AA1D0 118635~|~1~|~1~|~01/S50~|~Shave/Pave; Pavement Markings~|~05 - 4R Maintenance - Resurfacing~|~50EFB19CDF4A934370AE4A009CD41EEDE024BAF5 124546~|~1~|~1~|~01/NFA~|~Created For ODOT TID involvement. ~|~44 - Other~|~251CC84FDCDFAD26B3725031766556616846A4E3 96680~|~1~|~1~|~01/NHS~|~Plan Split for all roadway/pavement work inthe project. Includes mainline and all ramps. Limits are GRE US 35 from SLM 0-3.08~|~05 - 4R Maintenance - Resurfacing~|~E9E22F917BBD3EFA91B86DD734180FFB5DF506BC 96680~|~1~|~3~|~03/IMS~|~For repairs associated with the bridges carrying US 35 over I-675 ~|~13 - Bridge Rehabilitation~|~E253B4E6EA97600DE9B3436AC5B223A4F638CA09 96680~|~1~|~2~|~02/NHS~|~For all work associated with US 35, except for the bridges at the I-675 interchange.~|~13 - Bridge Rehabilitation~|~222F9C6C47201CF3A3DE1C5BA9B853C1E30BA6FF 96680~|~2~|~4~|~04/NHS~|~This plan split is for work on NHS bridges from Part 2 (PID 102792).~|~13 - Bridge Rehabilitation~|~8DA0CF41E2EE7323A58C7A52939FF7C4E2FF6407 93959~|~1~|~1~|~01/SAF~|~Two-year guardrail repair (ding and dent) contract for FY 2018 and 2019. Funded 100% state.~|~21 - Safety~|~4DE7E6501F3DBA1C607A1839534886C0370EF74D 97556~|~1~|~1~|~01/STR~|~Ohio Brdg Part. CR 4 SFN 4430328~|~10 - Bridge Replacement~|~DE9D86AA30F9C3ECCB02C1586800AA907516015B 97556~|~1~|~2~|~02/STR~|~Ohio Brdg Part. CR 6 SFN 4432002~|~10 - Bridge Replacement~|~7B97F48D030F98322FC557702813C2A167013A46 97556~|~1~|~3~|~03/STR~|~Ohio Brdg Part CR 13 SFN 4432983~|~10 - Bridge Replacement~|~62A7D37538DEC0448D8D4CBB6EC2DCF1B05209A3 116890~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8597073AC5E04EB1799FF348060EBFE4AE6923A7 109342~|~1~|~1~|~01/NFP~|~Resurfacing work in Scioto Trail State Forest.~|~04 - Reconstruction - No Added Capacity~|~D7D6A9CD8FD76A39C7F3A626A58FCD58A895F873 90140~|~1~|~1~|~01/STR~|~8603103 WIL SR576 12.9 Intersect: St Joseph River Overflow and culvert on WIL SR 2 11.05~|~10 - Bridge Replacement~|~6017E6BE94FAF4B4AD47D67C635814364B24E215 106593~|~1~|~1~|~01/BRF/LCEO~|~CEAO LBR program 4B87 (80% Federal) / LNTP (20% Local [15% CB and 5% LNTP] - See CAP Comments - Replace bridge Lic-TR121-1.44 (SFN 4532619)~|~10 - Bridge Replacement~|~53455C4770C7B2C6A07F2F83E249555C41E3DDE4 118765~|~1~|~1~|~01/NHS~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~2244193CC3FE1625274CA68D599D56C2848E4E8C 119260~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C7B95BB6A820E961C8851567E74DE59D5E9DF859 126721~|~1~|~1~|~01/S5K~|~Intersection improvement on SR 146 at Dillon School Drive~|~21 - Safety~|~D9E033ED2804341F02F3BABCCF583522CD5C946D 93126~|~1~|~4~|~04/NHS~|~Minor bridge work to 10' to 20' structure.~|~04 - Reconstruction - No Added Capacity~|~AEC9CE926F9D9C42554DDC56FBE03B1EB743DF5B 93126~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~10A502D4E539241940AE5B95A834D149A657FF01 93126~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7CC2B912C00ACBD5214F2E6B4BE4BC5E1F5A2126 93126~|~1~|~3~|~03/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~7DABA43B7591BDC994524C4E379F5F9AD79FE069 98320~|~1~|~1~|~01/STR~|~SCI 104 6.37-17.70SCI 348 6.70-12.80SCI 522 2.61-8.29~|~05 - 4R Maintenance - Resurfacing~|~6763DB60AB3506749D78E144722CD4669DA69422 98320~|~1~|~2~|~02/S<2~|~SCI 522 1.83-2.61~|~05 - 4R Maintenance - Resurfacing~|~30BFAFBE94F2BDDAC352E38799C9AA21001EFA69 120265~|~1~|~1~|~01/S>2~|~Plan split for federally eligible work items in the construction phase~|~10 - Bridge Replacement~|~F04A3AFF89A8179C53BDB6BCFE92DC855DDB4B71 120265~|~1~|~2~|~02/S>2~|~Plan split for 100% local items (waterline work and more)~|~10 - Bridge Replacement~|~E35774ACDD2E7D1224EABB4C0BCA734B6DEF00D6 114746~|~1~|~1~|~01/NHS~|~Double micro.~|~05 - 4R Maintenance - Resurfacing~|~64084309D8BC0C036E1F825FAB83808E27606C57 115354~|~1~|~1~|~01/MPO/NFRA~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A67AA6B6BB0671A2FFC162CFCA853636894A6063 91601~|~1~|~1~|~01/STR~|~Brdg Replacement. Located 2.01 miles south of SR41 and SR781 intersection in Adams County 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~4DC02FF69D060962C8DA630D8CCEC3A8AD6BE668 124111~|~1~|~1~|~01/NFA~|~Bridge replacement project. HOC CR 361 0.03, SFN 3731693.~|~10 - Bridge Replacement~|~1CA7B9C99F6C8792034AA2D845D809BFF8043B9E 116190~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~411866FC2091A43BED0FB2A2DA6B41E8F698C08F 96436~|~1~|~1~|~01/STR~|~Field pave inverts of corregated metal pipe arches. SFNs 1100971 (Treacle Creek) and 1101579 (Bull Branch).~|~13 - Bridge Rehabilitation~|~D31480F6F092E0C99B6F77CA17B935A2D8D7E223 126229~|~1~|~1~|~01/NFA~|~Construct bike path~|~28 - Facilities for Pedestrians & Bicycles~|~FB591FFC35C4388EE3EC6039A0D2E1E4D5385F59 126071~|~1~|~1~|~01/BRO~|~Plan split for maintenance work on bridges~|~47 - Bridge Preventive Maintenance~|~E552C79F0AD1BFC44D45FDF2455D6594CB38BC2E 124618~|~1~|~1~|~01/ENH~|~Programming project.~|~28 - Facilities for Pedestrians & Bicycles~|~A364BF6C91E3904999EE381EE7B0554033987C8B 92847~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~04524F8C308D843C2099C7DA4432665F13C7926E 110924~|~1~|~1~|~01/NFP~|~Culvert Replacement at WAY SR 0057 06.73, WAY US 0030 06.63 & 06.98.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~00E9579FB80B5EF9EDE110580077203E2FD6F78C 97036~|~1~|~1~|~01/IMS~|~Culvert rehabilitaton at 90% federal/10% state~|~44 - Other~|~E2FBAD39C6A64D09BBD7CE58D3DE4CACA3EAFE6A 102204~|~1~|~1~|~01/SAF~|~Widening SR 44 for SB right turn storage lane and signal upgrade.~|~21 - Safety~|~7935EAA062D6BA05BF1B2C4E47F97F5B7866CE43 102204~|~1~|~2~|~02/SAE~|~Construction of Pedestrian crosswalk and ped head.~|~21 - Safety~|~22B8643FAC04A3E1B086E195B5E323C6593FE2C8 125184~|~1~|~1~|~01/SAF~|~Traffic signal and lighting replacements~|~21 - Safety~|~E1ED1E5751A35067E5BD60F1936C4E048C8C4946 110255~|~1~|~1~|~01/MPO~|~Construction of a new sidewalk along West Stroop Road on the north side from Overland Trail to Southmoor Circle NW (no existing sidewalk in this section)~|~28 - Facilities for Pedestrians & Bicycles~|~943B7BB7779574E8483F041E19B4A83A2A794D1D 104254~|~1~|~1~|~01/NFP~|~Crack Seal Various Routes in District 3~|~44 - Other~|~5681C4DE77A336830578E87D39036303B9B08A9E 123246~|~1~|~1~|~01/S5K~|~Reactive Maintenance, Spot Paving~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C4ADDDB2468E7799F8C615382977144501BC6E7F 100331~|~1~|~1~|~01/NFP~|~This is the district's annual auxiliary pavement marking maintenance project.~|~21 - Safety~|~A36C56AA3031236390024BDF9D0B0838FE671926 117357~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 164 over an unnamed tributary to Riley Run.~|~04 - Reconstruction - No Added Capacity~|~9B0E8FC9202E48D627FA22C5A88AE747423236A5 87276~|~1~|~1~|~01/STR~|~general system - minor rehabincludes: reconstruct outside 4' x 4" of shoulders; Structural overlay of surface~|~05 - 4R Maintenance - Resurfacing~|~F61B79B7AF400484991D047DD99DC3CE0862D4FC 102929~|~1~|~1~|~01/STR~|~STP Rural funding eligible.~|~17 - Construction Engineering~|~1FD89272A0AA17ED2B1AE367461FA0CD01B9A773 107929~|~1~|~1~|~01/STR~|~Resurface on SR18 outside the Fostoria urban area using district preservation funds From the Wood County line at 0.00 to TR 262 at 6.46. (80% Fed and 20% State).~|~05 - 4R Maintenance - Resurfacing~|~85562F844A152B0F2ABF71CE8BC32E52464AC436 107929~|~1~|~2~|~02/S<2~|~Resurface SR 18 inside of the Fostoria urban area but outside of the City of Fostoria. On both sides of the road from the Fostoria Urban Area at TR 262 at 6.46 to where the project ends where SR 18 enters the City of Fostoria on the left side at 6.89. All funds are from the District Preservation Program budget. (80% Federal and 20% State). No local funds.~|~17 - Construction Engineering~|~CE11B129EBF2F88D2DAD94003FE71B81DD5F553E 125489~|~1~|~1~|~01/MPO~|~sidewalk replacement and new sidewalk to improve pedestrian connectivity on Chester Rd & Marion Rd~|~28 - Facilities for Pedestrians & Bicycles~|~DE7C90E1B9AA786C9D4DB15901CD2922AC05254A 113315~|~1~|~1~|~01/NFP~|~Rebuilding of the NB WAS 77 Rest Area as the Gateway to Ohio Welcome Center. Funded 100% State.~|~01 - New Construction~|~B49E347851857CD72E3963F27B098A53A8CF65C2 87854~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Preservation Program SAC 4PS7.~|~13 - Bridge Rehabilitation~|~6264694B75604D959E89E19B8F9B9FF247B87371 114316~|~1~|~1~|~01/NFP~|~Replacement of RPMs across D05.~|~21 - Safety~|~F881299AFF281BB31807157AFB5D6490C6E79B03 93982~|~1~|~1~|~01/NFA~|~Brdg ReplacementOn TR225 (Shoemaker Road) 0.18 mile from SR124, it is proposed to replace the structure (SLM0.18) (SFN 6633072). 80% Fed/20% local01/NFA/BR/Pike~|~10 - Bridge Replacement~|~7DCBDE255920790BBF7681F3D5883A9E869B46B7 105377~|~1~|~1~|~01/NHS~|~Double mircosurface on NHS routes: AUG US 33 SLM 16.92 to 23.07~|~05 - 4R Maintenance - Resurfacing~|~9FB51B2E4DB0734232AD188C27B13E258266213A 126584~|~1~|~1~|~01/SAF~|~Safety plan split~|~21 - Safety~|~510A6623138581349D18AFA1B77F01DE10A7456B 106281~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout ATB, MAH and TRU counties.~|~21 - Safety~|~44D11BB2D8637E1630DFE0C461F2F682FCE04D62 109433~|~1~|~1~|~01/IMS~|~Emergency A bridge expansion joint repair.~|~17 - Construction Engineering~|~953408DBD6CB787D4385FD659114026E125FF45A 112417~|~1~|~1~|~01/IMS~|~Concrete Pavement Restoration~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AD0FEEB53413A5DAEFB97636C6F2A024EF86ED05 102736~|~1~|~1~|~01/NHS~|~This plan split is for bridge rehab on NHS bridges.~|~13 - Bridge Rehabilitation~|~DBAD8AE91CB24E84334ECED4C9FBB34B88B19AAF 102736~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~AAAD6D5FBB49A1EDEF65D3339919D9198062F134 83703~|~1~|~1~|~01/NFA~|~Bridge replacement project over the Little Musking River. WAS CR 14 0.06, SFN 8430403. CEAO funded project using Credit Bridge.~|~10 - Bridge Replacement~|~2C9278A1D58A0EEED5D92115EF9C5DADEE318D5C 100093~|~1~|~1~|~01/BRO~|~Replacement of SFN 3831973; CR 23 over Mohican River.~|~10 - Bridge Replacement~|~375054DEA4E528074262EE4A3BC20BC86D008994 122215~|~1~|~1~|~01/IMS~|~Resurfacing and related work on IR 70 in Guernsey County. Replace concrete pavement at ramp intersections at I-70/ S.R. 285 interchange.~|~05 - 4R Maintenance - Resurfacing~|~D3D06EAE74A5883873C3657AB89CAC0C78EF9184 121673~|~1~|~1~|~01/IMS~|~FRA-270-42.115 over ramp to IR 70 & US 40; replace deck~|~13 - Bridge Rehabilitation~|~7504E2190A7C379E95B722E6020C30037880A6DC 99752~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG CR 17 0.00-2.40. Not on any federal aid project funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~CAF31344238FB7741A46B43E777DD63C5766B328 95107~|~1~|~1~|~01/ENH~|~Construction of 1.2 miles of walkway in the Village of Syracuse. Path will follow along SR 124 and go 0.7 miles to a plaza area that includes the post office. Path will also go through the park to the boat launch and return for 0.5 miles. Funded 80 federal enhancement/20 local.~|~28 - Facilities for Pedestrians & Bicycles~|~6975D112BF71AFC4A676374C77C45FE32422CB89 90905~|~1~|~2~|~02/S<2~|~100% Erie County - Sanitary and Water Line~|~43 - Utilities~|~0C689382857C2A92E7F5EF3BBE9BEA37C6EF6D6A 90905~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~10 - Bridge Replacement~|~71D18E3643CDDC0BF23E4670F66E643D51AAA28F 90905~|~3~|~3~|~03/BRO~|~Consultant to Review Field Conditions~|~17 - Construction Engineering~|~8D0C7EB8F44F6EBF2A69C2CADAB2E42142B8DE83 89137~|~1~|~1~|~01/BRF~|~6633307 PIK TR524 0.01 Intersect: Tributary Swift Creek CEAO 80 Fed/20 Local Match Pike County 01/BRF/BR/Pike~|~10 - Bridge Replacement~|~E219801F7CE2770BDF819AA09592BA71F6AFA9E8 94117~|~1~|~4~|~04/NHS~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~CB218D683A232962465A9A71545D27E8227E7066 94117~|~1~|~3~|~03/IMS~|~See linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~F525A4B6B31AC03B71ED3F5E425122900D2B8098 94117~|~1~|~2~|~02/NHS/AKRO~|~Resurfacing of SR 91 from SLM 0.72 to 1.40 and 1.80 to 2.54, Urban Paving in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~9FD9AFC8EC9F9D5979FE0AAA01EE09CD66686CD3 94117~|~1~|~1~|~01/NHS~|~Resurfacing of SR 91 from 0.30 to 0.72.~|~05 - 4R Maintenance - Resurfacing~|~3B27A5C82218B8F78911FFD59CE50FC4E7D3A366 94117~|~1~|~5~|~05/NHS/AKRN~|~100% City of Akron items (curb, walk, etc).~|~05 - 4R Maintenance - Resurfacing~|~EBCC1B1234132883016CCCCAC8DE20404AB6E6E1 112153~|~1~|~1~|~01/NFP~|~Spot paving treatments throughout District 5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~59CD10096E0B6AEA502CE2411C5064E758EFD117 116651~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~29820266B4FF7D6429FA3351394B9FC77A4AE219 116651~|~1~|~2~|~02/S>2~|~STP > 200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~4E47BFE40DED1F55262874C520C6FB37C88E8C44 116651~|~1~|~3~|~03/S5K~|~STP 5,000 to 49,999 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~91A29AAD81BADBF6A498333DFC850988E2FCA2C8 116651~|~1~|~4~|~04/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~8A6C2A206446E16ABC0D4091AAC81C76D3BA0271 93991~|~1~|~1~|~01/BRF~|~Otway Covered BridgeThe Otway Covered Bridge is just outside of the Otway corporation limit, southwest on SR348, then turn west onto Piper Road, TR487, with the covered bridge being located approximately 200? from the SR348/Piper Road intersection, the Otway Covered Bridge spans Scioto Brush Creek in Brush Creek Township, Scioto County, Ohio. It was built in 1874, and is listed on the National Register of Historic Places. It is proposed to restore the strucuter to a single span, remove eixisting steel piers, and replace broken deteriorated timber members, install a new roof & new siding as well as fire protection to keep the bridge in good repair. No SFN do to no longer in use by county.80% FHWA Discretionary Grant Program20% local match01/BRF/BR/Scioto County~|~32 - Historic Preservation~|~72B1AE9E0DB5D7D2A17440DABDB3039925B736D3 108323~|~1~|~1~|~01/IMS~|~OH18-01 ER Event. Landslide repair project. WAS 77 15.37 NB. DSR WAS-008. Funded 100% federal.~|~~|~7253897F43FE58B70FEFBD8BECE2E679B30F2BC8 97855~|~1~|~1~|~01/MPO~|~Freedom Trail Phase 3, multipurpose trail.~|~28 - Facilities for Pedestrians & Bicycles~|~0F36EDF57EC3F2B3E85F89DD1F0A0865EF1E9B7F 123513~|~1~|~1~|~01/S50~|~High Friction Surface Treatment and upgrade pavement markings~|~21 - Safety~|~CE01BEAE7D0C5E74373185648342BCC037B8B8F5 123513~|~1~|~2~|~02/SAF~|~Resurfacing~|~21 - Safety~|~24900539E539E32AFF55E71B6D5E9E150E96FE82 98169~|~1~|~1~|~01/NHS~|~SCI-23-2.6 to 10.57~|~05 - 4R Maintenance - Resurfacing~|~6F08291BA5CA95C2E1A39630B22533AAAED54E90 98169~|~1~|~2~|~02/NHS~|~Joint repair.~|~47 - Bridge Preventive Maintenance~|~8B07FE4D471C07701A89DBAC0AD7254761C4B469 109671~|~1~|~1~|~01/STR~|~AC Overlay with repairs: CLE-131 SLM 11.98 to 15.14~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3104EEF85D851143E22DF63CC6CB3C302ED001FE 100368~|~1~|~1~|~01/IMS~|~Patch damaged ares of IR 75 in Auglaize & Shelby counties. AUG IR 75 SLM 0.00 to 4.51 SHE IR 75 SLM 18.88 to 20.55~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~937CD6D205EDDB093BAA9AF7FD8A30E3B24857FF 100368~|~1~|~2~|~02/STR~|~SR 196 SLM 4.51 to 4.80 (From their school to the Waynesfield North corporation limit at Sunrise Street) add a 1.25" asphalt overlay.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~237C45DCB6708CC8D36D2DD71567D24CD9C35CE7 96947~|~1~|~1~|~01/MPO~|~Split for work eligible for widening of SR-82 using MPO STP at 50% federal / 50% local.~|~03 - Reconstruction - Added Capacity~|~7979CBC966562BCC8C4A7BEE8B49D1C9A3C4F105 96947~|~1~|~2~|~02/NHS~|~Split for the equivalent of a face-to-face of curb (edge-to-edge of pavement) resurfacing project using urban paving funds at an 80/20 federal/local split.~|~05 - 4R Maintenance - Resurfacing~|~D8B1FC900827A18158113F2ECA7F531B80FF1DB1 127218~|~1~|~1~|~01/SAF~|~Plan split for all work associated with the construction of the roundabout~|~21 - Safety~|~01A9A5B2A74BE2637ED929521F4BEB7574DFF9AF 84461~|~1~|~1~|~01/BRF~|~Newton Falls Bailey SFN 7830602 CR 92B over stream~|~10 - Bridge Replacement~|~0DBF4CEDA6CEDC9511F513209D9E38CC46747552 121057~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~C6ABDC0A5C8F70AC519213273D4543037E08F8F2 99470~|~1~|~1~|~01/MPO~|~Resurfacing of Fulton Drive (TR-211) from Tuscarawas Road to Park Drive, in the City of Canton, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~89A9463A24CB4B77A748E2DE62413D8FA02348AA 93684~|~1~|~1~|~01/BRO~|~High level bridge over the Maumee River in City of Toledo, SFN 4800303.~|~13 - Bridge Rehabilitation~|~7F014A32BD50A0AB2B4B59164079AA457D25785E 88822~|~1~|~1~|~01/IMS~|~Sign Upgrades Interstate routes.~|~21 - Safety~|~485623D044EF6D66EC6842231983FD19DCC5FA71 88822~|~1~|~2~|~02/NHS~|~Sign Upgrades NHS routes.~|~21 - Safety~|~D99F1B435265DECBF13BEE5681BD77DBEE835A2F 88822~|~1~|~3~|~03/STR~|~Sign Upgrades Rural routes.~|~21 - Safety~|~206DB596F51465DBF5BFB0062C37CFAB5F1552DC 88822~|~1~|~4~|~04/S>2~|~Sign Upgrades Large Urban routes.~|~21 - Safety~|~37152B4773229810C3763873CBD7F2B71FAD6B56 88822~|~1~|~5~|~05/S<2~|~Sign Upgrades Small Urban routes.~|~21 - Safety~|~3F239C572DBE639E721C6BA7D0E5D3F15329210E 88822~|~1~|~6~|~06/NFA~|~Sign Upgrades NFA routes.~|~21 - Safety~|~F8EAC31E91099D0630FA2E23209238AC3ADF985A 97770~|~1~|~1~|~01/S<2~|~SR 159 0.89-1.02~|~05 - 4R Maintenance - Resurfacing~|~DC5D59E0EF769A34D0D8A048379EC0AA7E25D898 101253~|~1~|~1~|~01/SAF~|~Akron Safe Routes to School, signing and striping upgrades to various crosswalks throughtout the city of Akron.~|~21 - Safety~|~D02ECEEF999786FF0629FC9397A80F4BFD6B1CFD 120639~|~1~|~1~|~01/STR~|~Slope stabilization along US 22 in Fairfield County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE4A7DAA2740A92E9E13EF3090077880FB426349 93946~|~1~|~1~|~01/NFP~|~District wide pavement marking plan for long line FY 16 markings using 4PS7 sac code.~|~21 - Safety~|~0A9E4C4B2E38BC73CF65EAB7810576AF4B5DE19C 93434~|~1~|~1~|~01/CMQ~|~Signal Coordination through central based system. Includes fiber optic interconnects, new signal heads, pedestrian signals, ADA pushbuttons, on Waterloo Road between Main Street and Arlington Road, in the City of Akron.~|~~|~8835AB710AAE37A9B17583767C7C98BB4B450159 85355~|~1~|~1~|~01/ENH~|~LAW Ironton SRTS Phase 1 - Safe Routes to School ProjectProject Termini: Delaware Street & 2nd Street Project Description: It is proposed to construct a new sidewalk on Delaware St. beginning @ 2nd St north for 400' with an additional 315' of sidewalk in front of the school and another 65' with a 6' box culvert by the ball field parking. Project includes school zone signs & pavement markings on Delaware Street and a crosswalk and pavement markings at Delaware & Thomas. Per Julie Walcoff, SRTS Coordinatior, Detail Design shall be performed by Task Order Consultant CH2M Hill from PID 86966. 100% federal01/ENH/OT/Ironton~|~28 - Facilities for Pedestrians & Bicycles~|~5F0BE233FF9A46675B710E945AD9EABE761637BF 75520~|~1~|~1~|~01/NHS~|~The split is for resurfacing on the National Highway System (NHS)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~04D0542AAD35978AF0E1E11D38024AAAF224DF46 124540~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~A43B18E6051122A6EEBB38A792693473A24BB115 116252~|~1~|~1~|~01/NHS~|~Fine Graded Polymer AC Overlay ~|~05 - 4R Maintenance - Resurfacing~|~05F454177E676E9AB67E627A5237BF8F53BD8141 116738~|~1~|~1~|~01/NHS~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~0E79389835CA239B7C5EE5FB2BE4EEBB151044C3 123290~|~1~|~1~|~01/SAF/TUS~|~Pavement marking installation (various routes) utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~E806B4839C2599C754A71C10CA89E17C29FC97B8 76122~|~1~|~1~|~01/BRO~|~The project involves the replacement of the existing bridge (HAS-151-0485, SFN 3402010) with a much smaller structure. An initial feasibility study will need to be performed to establish the viability of this.~|~10 - Bridge Replacement~|~26C769CDCA41CB249F88E6C3ED4DD5D8A9052056 90651~|~1~|~1~|~01/NFA~|~culvert at HEN SR18 1.91-1.92~|~04 - Reconstruction - No Added Capacity~|~9BDE54CE9C13DEABF0DE96154197FDC4B981ED99 122463~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~21 - Safety~|~42DFAB200A78FF30B12F134EAE972075D36B9C93 119423~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs ERI-60-0.00 to 3.43~|~05 - 4R Maintenance - Resurfacing~|~8279D74004CF15542EA0BC3E7B6A60059573C405 90218~|~1~|~2~|~02/ENH~|~Work items using 100% local funding.~|~28 - Facilities for Pedestrians & Bicycles~|~83F44503A73193512020ECA27B93AFDA428D5FD0 90218~|~1~|~1~|~01/ENH~|~80/20 fed/local funding split for use with enhancement funds.~|~28 - Facilities for Pedestrians & Bicycles~|~DAF52B08FA05801705D3324B8D1773252A3565EB 102000~|~1~|~1~|~01/NFP~|~Loop maintenance and repair along various routes throughout District 4.~|~21 - Safety~|~00814EF34E833EA83D93B8ABCA9CB09EE146EA13 121633~|~1~|~1~|~01/NHS~|~Improve lighting~|~21 - Safety~|~E095AF0BE6B2A1967F6164C158AF040DD7ECBC06 124019~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs WAY-95-0.00 to 7.974 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~FAACB33990979A8EEBC36B73657B7FB1DD76AFC0 124019~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs WAY-95-7.974 to 8.744~|~17 - Construction Engineering~|~F8BDAC1043412104D9333216F0CDD2C450083313 97185~|~1~|~1~|~01/SAF~|~Various intersection improvements at SR 183 including reflective back plates; new warning signs; upgrading the existing signal; and increasing the storage capacity of the turn lanes on the northbound approach.~|~21 - Safety~|~4D289C5E418B83313F3F9434D9827D3FD768B4D3 118759~|~1~|~1~|~01/STR~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~8A3924861992CB2FFF04936A6C130D7F57B28B2F 100065~|~1~|~1~|~01/STR~|~Slide repair LAW 217 7.80~|~44 - Other~|~43E6D1503326A0AE1B73DAA7FD3A589786D55E1C 112943~|~1~|~1~|~01/STR~|~Rural Plan Split: PIC-56-0.00-16.32~|~05 - 4R Maintenance - Resurfacing~|~68EAD9615C6C58B2A930D5E4394B5F52A63A89F6 86648~|~1~|~2~|~02/S>2~|~100% Whitehall funded items - pvmt repair02/S>2/PV/WHIT~|~05 - 4R Maintenance - Resurfacing~|~26D5F38CF4D98927DA0BCECE0022EEEF5ADE8FC0 86648~|~1~|~1~|~01/S>2~|~Federal/Local urban paving in Whitehall, SLM 18.63-21.4001/S>2/PV/~|~05 - 4R Maintenance - Resurfacing~|~A53891CD8FD60B365AE9E14296B33380A2D2BAE9 126106~|~1~|~1~|~01/BRO~|~Plan split for all work associated with SAN-600-0868 bridge~|~13 - Bridge Rehabilitation~|~2D4741B75B7A795E4C0259342D81482042CFCAFB 94086~|~1~|~1~|~01/STR~|~Four Lane mowing contract for Interstate 75 and US 33~|~~|~B139BF981223F24230EA5E8ABD1B6C466DC5F1DD 125630~|~1~|~1~|~01/STR~|~Construction funding for bridge replacement~|~10 - Bridge Replacement~|~EA43CD1D5E13A0907D36879C3FF2B65B056A16F9 121251~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~E7F015D9C95DBC43DAB85DFA857060823EBFB294 121251~|~1~|~2~|~02/NHS~|~Resurfacing.~|~~|~68A0990D0BCA28316A4D54CA337A72E4A31F41DF 121251~|~1~|~3~|~03/S>2~|~Resurfacing.~|~~|~F1BD5FA2B5140EC32695BDB17DABCCDB82711214 121251~|~1~|~4~|~04/STR~|~Resurfacing.~|~~|~AF1B7A128087779D9E3C86419B64148188595D46 101456~|~1~|~1~|~01/STR~|~DSR# JEF-004~|~04 - Reconstruction - No Added Capacity~|~A00E3CBD0A988EFBDED756E97763CAF2EFF8C349 93151~|~1~|~1~|~01/BRF~|~Bridge replacement project. GAL CR 121 1.52 (SFN 2740516). Federal 80% and Local 20%.~|~10 - Bridge Replacement~|~9E79016FC9557CC72538DDD5DF35874A35751F14 117745~|~1~|~1~|~01/SAF~|~Rebuild traffic signals~|~21 - Safety~|~0F31627143FFDC508600F8E656D10BEA33E5946D 90225~|~1~|~1~|~01/STR~|~Bridge work on MAH-US224 SFN 5004535, 5004608, 5004616 and MAH-534 SFN 5005809, 5005833, 5005892, 5005914~|~~|~F25FB3F926EDA2BB99D99CEBE3D3CD5518121FE4 121792~|~1~|~1~|~01/SAF~|~RPM on various CR.~|~21 - Safety~|~7825CFA1858597AD03960AE0864CAF38DD875EE8 84545~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment with repairs. WAS 339 4.38-8.57. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~D7256C388F24002A3A3FA3D904FE198E035428EA 100523~|~1~|~1~|~01/S<2~|~Resurfacing of US 62 on the STP-Urban sections (SLM 0.00 to 1.13, 2.61 to 3.87, and 4.40 to 4.86)~|~05 - 4R Maintenance - Resurfacing~|~A6EFA09F618830930E1B46F4BB48A51E9AA47B5B 100523~|~1~|~2~|~02/STR~|~Resurfacing of US 62 in the STP Rural sections (SLM 1.13 to 2.61 and 3.87 to 4.40)~|~05 - 4R Maintenance - Resurfacing~|~3BC489E96028607621F5A63C3CB28675A09A7FA0 89037~|~1~|~1~|~01/CMQ~|~80/20 fed/local CMAQ funding for all work on this project~|~44 - Other~|~0BA6D102958BC9B86147329708385692B931E5A5 89037~|~1~|~2~|~02/CMQ~|~100% local participation for work items not eligible for CMAQ funding as well as the cost of the project beyond the capped CMAQ funding.~|~44 - Other~|~802149CE6B931ACF527D8F186D1A66828F54EBB8 119985~|~1~|~1~|~01/MPO/FRA~|~MVRPC STBG funded resurfacing of SR 73 in the City of Franklin with a 31% local match.~|~05 - 4R Maintenance - Resurfacing~|~A325A7C5E98C99F2E0FCD5AA7E2A6DE68F7D9AC7 101229~|~1~|~1~|~01/NFP~|~Construct new outpost.~|~44 - Other~|~83691A355FF4D5CE7CB533669A3D18F62AE53F5E 102961~|~1~|~1~|~01/NHS~|~NHS Resurfacing: LOR-58~|~05 - 4R Maintenance - Resurfacing~|~9F8951BD7B77489A7D3D5C074DF0AB1E82F39390 102961~|~1~|~2~|~02/S<2~|~STP < 200000 Resurfacing: LOR-113-6.48-7.31~|~05 - 4R Maintenance - Resurfacing~|~8D1E2C7BD4B9F6F12121CF6BC3DF58DD85EB8C6D 102961~|~1~|~3~|~03/STR~|~STP Rural Resurfacing: LOR-113-7.31-7.45~|~05 - 4R Maintenance - Resurfacing~|~3E39A4B40E942DA0C385ED678B7AFADCF98CC81D 125395~|~1~|~1~|~01/NHS~|~Resurfacing and related work on US 36.~|~05 - 4R Maintenance - Resurfacing~|~706218A72F3A6D0C5E215E9F365E25E8823E35A8 98235~|~1~|~1~|~01/S<2/NEWA~|~City of Newark SRTS Funding - 4SC7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Project for sidewalks on Arlington Avenue~|~28 - Facilities for Pedestrians & Bicycles~|~79E8193BE7EB37EF01AF55E2F4F12F264658170F 122833~|~1~|~1~|~01/MPO~|~Roundabout~|~21 - Safety~|~05CF4AADB2C2F7FE670DA1B45D4B7206E58ECFA9 85500~|~1~|~1~|~01/BRF/LIMA~|~For work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~13 - Bridge Rehabilitation~|~8FF56930F073C84F5F49201237085C55559DD2C9 126796~|~1~|~1~|~01/NFP~|~Mowing and litter pick up at various locations~|~99 - State Preventative Maintenance~|~D9C2BADB448B145D33F98D297865A4B0BE655AFE 115955~|~1~|~1~|~01/SAF~|~Installation of centerline and edgeline rumble stripes on MEG 7 14.58-18.64. Safety funded.~|~~|~08635107CFFEF76C151F46B42F7CC8FBE2E60262 87258~|~1~|~1~|~01/STR~|~LAW SR217 0.00 - 8.73 Resurfacing Project Begin at SR141 and terminate at the 8.73 mile marker.Pave Thru Brdgs: 4402855 LAW SR217 2.17 Intersect: Big Ice Creek 4402952 LAW SR217 5.77 Intersect: Dicks Creek 4403002 LAW SR217 6.86 Intersect: Venisonham Creek 4403045 LAW SR217 7.39 Intersect: Trib,Venisonham Creek Skip these brdgs: 4402979 LAW SR217 5.85 Intersect: Symmes Creek 4402898 LAW 217 2.32 80/20 split 01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~365977B89F30E20E48D21CE7AA68FCE5842A4871 86834~|~1~|~2~|~02/S>2/Cin~|~Urban Paving for the City of Cincinnati in FY2013. This project will resurface a portion of Reading Road (US 42) from Dorchester to Paddock: US 42 from SLM 2.60 to 5.70. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~06EA9CCD4C6AF7E4EABA99B9ED5E4B22CD6A55BD 86834~|~1~|~1~|~01/S>2/CIN~|~Urban Paving for the City of Cincinnati in FY2013. This project will resurface a portion of Reading Road (US 42) from Dorchester to Paddock: US 42 from SLM 2.60 to 5.70. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new aspahlt overlay and final striping.~|~05 - 4R Maintenance - Resurfacing~|~99400F98F6BA8D46FDCD38E13183CBAECBCF094A 81486~|~1~|~1~|~01/NHS~|~minor rehabilitation of BEL-7-11.87 to 14.08; inludes asphalt overlay of existing bare concrete, pavement repair, pavement marking, rpms~|~05 - 4R Maintenance - Resurfacing~|~5C4B4EC82ADFF126FFB327815345E6A7F65324EF 110981~|~1~|~1~|~01/SAF~|~Safety money~|~~|~2805BF1484F8577E9EBED696DA5A38DE0BE4B048 107562~|~1~|~1~|~01/MPO~|~Multi-purpose trail, NOACA Funded~|~28 - Facilities for Pedestrians & Bicycles~|~7466D9943800ED7E4E71084BCA054CBF1A8CDC11 114624~|~1~|~1~|~01/SAF~|~Intersection improvement~|~21 - Safety~|~18C6D125F78833CDA4857E09A992A5D72C508A34 122183~|~1~|~1~|~01/SAF~|~Plan Split for Safety-funded PHB's~|~21 - Safety~|~9A129D1ACCB6BB096DE8067707A4BABD181FBE08 122183~|~1~|~2~|~02/SAF~|~Plan Split for 100% Locally funded cost for Alternate Bid Item~|~17 - Construction Engineering~|~A3F9815B8A90E39C7CE068911644683927F1DBE4 102444~|~1~|~2~|~02/STR~|~Culvert invert repair FY19BRO 68 21.03HIG 247 3.29PIK 772 18.86~|~04 - Reconstruction - No Added Capacity~|~F86FDBD8C93BE1CEE35E7C5493374D419795B9F3 102444~|~1~|~3~|~03/S<2~|~Culvert invert repair FY19SCI 239 0.74~|~04 - Reconstruction - No Added Capacity~|~62C84AE84CEA9A330723C8768FA21517EC2AE462 102444~|~1~|~4~|~04/STR~|~ROS 138 16.41 Invert Repair~|~04 - Reconstruction - No Added Capacity~|~546FC42E86C40B21D451A2DE27E8EBD97BEEA377 102444~|~1~|~1~|~01/NHS~|~Culvert invert repair FY19ADA 32 3.82/5.57/14.54BRO 32 3.06/19.19ROS 35 15.09/16.17~|~04 - Reconstruction - No Added Capacity~|~525ACB613AF838856C5440CAD75593752D312EAB 106209~|~1~|~1~|~01/IMS~|~FY 2023 Block PID for drainage system maintenance/repair.~|~44 - Other~|~07A63642A12E3297012E5B951E74159AB05E1539 93883~|~1~|~1~|~01/CMQ~|~MORPC CMAQ funding for bikepath and and related items~|~28 - Facilities for Pedestrians & Bicycles~|~98FAAF5C5B6AE7AA5606682A7C76792BE1E27212 93883~|~1~|~2~|~02/MPO~|~MORPC STP funding for bridge pile cover/aesthetics on Main, Rich, and Broad St bridges (due to lowering water level)~|~31 - Landscaping & Other Scenic Beautification~|~AB518C722B8F3FA0DC6F720E6FF0EC6A25325FD1 93883~|~1~|~3~|~03/ENH~|~MORPC TE funds for landscaping~|~31 - Landscaping & Other Scenic Beautification~|~FB731B7F3203F764A5834C7EC8026E8FC61993C9 110992~|~1~|~1~|~01/SAF~|~Add SB right turn lane, signal improvements and friction improvements~|~21 - Safety~|~AEA84C2B58B9F084B22B4D6E3317F04ADEB36570 93418~|~1~|~1~|~01/NFA~|~resurfacing of entrace road, gatehouse road, Marina Road and road from gatehouse to vacation cabins at Atwood Lake Park; resurfacing of Downey Dr. SW at Atwood Lake Park; resurfacing of full depth repairs and resurfacing of Marina Ramp turnaround, Marina roads, and campground roads in Piedmont Lake Park - using MWCD funding~|~47 - Bridge Preventive Maintenance~|~AAAE5097A326DDAA3085A2DD5CB52229CA346A15 111449~|~1~|~1~|~01/ENH~|~Construct sidewalks along SR 241 in Mt. Hope at 95% Federal/5% Local (95% 4B37/5%LNTP)~|~28 - Facilities for Pedestrians & Bicycles~|~A4B8C3FFAC8AF40B943359888BAE0180F29397CB 122247~|~1~|~1~|~01/NFP~|~All items of work associated with repair/replacement of ROW fence~|~44 - Other~|~7843026F88AA8E144C0D615554A13BC8489C7F11 90435~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 821 4.88, SFN 6105378. Rural federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~B2E733FAE76EF71E098AD71B4EDB5E45945A1BF9 121841~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~EC366E4B0B8D9D3D51D4F99DFC206C72EB83BD11 110465~|~1~|~1~|~01/STR~|~01/STR/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~FC368430DDBA6F9D3C78F7078D70F328C81D5582 113924~|~1~|~1~|~01/BRO~|~CEAO funded items~|~10 - Bridge Replacement~|~67DDA6A00C9177B2A9622CA0BBCD250B2DC64D8F 81766~|~1~|~1~|~01/SAF/PICK~|~Safety Program - 4HJ7 (90% Federal) / 4BG7/4BG6 (7% Local/3% OPWC ) - CAP (See Comments) - Safety project on FAI SR 256 2.16 - 2.88 and Refugee Road (CR 7) to add turn lanes, upgrade signal equipment and add medians and sidewalk along SR 256 and CR 7.~|~21 - Safety~|~28007400CD221E40E743E4F6EF49768F855C64CE 81766~|~1~|~2~|~02/MPO/PICK~|~MORPC STP Funds - 4TA7 (80% Federal) / 4BG7/4BG6 (17% Local /3% OPWC) - CAP (See Comments) - Safety project on FAI SR 256 2.16 - 2.88 and Refugee Road (CR 7) to add turn lanes, upgrade signal equipment and add medians and sidewalk along SR 256 and CR 7.~|~21 - Safety~|~968F14A8C06D763F4942D1DB6E29BE45376E6D34 112965~|~1~|~1~|~01/NHS~|~FRA-33 from 9.17 to 10.79~|~05 - 4R Maintenance - Resurfacing~|~4A4DE9E00C5A397A855E37892CD429D699EDC56B 112965~|~1~|~2~|~02/S>2~|~FRA-674 from 1.96-2.07 and 2.13-2.17. FRA-62 from 8.850 to 9.080, 9.100 to 9.140, 9.200 to 9.500 and 9.740 to 9.960~|~05 - 4R Maintenance - Resurfacing~|~F020559A0DB002FED389F038A48AB41EC7FF8BE0 108154~|~1~|~2~|~02/NHS~|~FRA-317 from 15.95-15.97~|~05 - 4R Maintenance - Resurfacing~|~DCD3F4E6BE0EBE9AB25D94C9BFD87C6A97D52E87 108154~|~1~|~1~|~01/S>2/COC~|~City of Columbus Urban Paving: FRA-317-15.97-16.37~|~05 - 4R Maintenance - Resurfacing~|~5B86B14DF83CDACBB89D9C671AF49A35756E9224 108154~|~1~|~3~|~03/S50~|~City of Gahanna Urban Paving Plan split - FRA-317-16.37-18.52.~|~05 - 4R Maintenance - Resurfacing~|~17187FC74BE062C75E50CC0D2A1D8F447BF8F90F 126015~|~1~|~1~|~01/NHS~|~FUNDING EVENT~|~05 - 4R Maintenance - Resurfacing~|~D0C8ADFE5A1A60F71DECA78C144F19F809BFB681 83663~|~1~|~3~|~03/IMS~|~Major reconstruction of the existing lanes and the construction of an additional lane in each direction on IR 70 from US 68 interchange to the SR 72 interchange. Other work will include installation of median cable barrier and all required roadway, erosion control, drainage, traffic control and maintenance of traffic items. Addition of a noisewall. CLA-IR-70 10.540 to 14.000~|~03 - Reconstruction - Added Capacity~|~596E71EE2770B33201A74FFC437BC4FC2D85FE78 83663~|~1~|~4~|~04/S>2~|~Resurface add curb and curb inlet in this area of SR 72 SLM 6.50 to 6.77.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~ADF35C28693A591738744110B2D722F15D405CC8 83663~|~1~|~2~|~02/IMS~|~Rehab of structure CLA IR 70 11.51 - SFN 1204297~|~13 - Bridge Rehabilitation~|~2EE9E9EFB09EC9E6C99973BF8C769A21C3D7BA92 83663~|~1~|~1~|~01/IMS~|~Replacement of structures. MSE walls required CLA IR 70 12.08 and 13.26.~|~10 - Bridge Replacement~|~DC266EAB58D888D94C43A9119E35D0DD96B7ACC7 83663~|~1~|~5~|~05/IMS~|~On-going services~|~~|~601D72F5F5E711AAB507C271934B977F06C4D39F 83663~|~1~|~6~|~06/NFP~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~DD0B82E92C48A79A1DA0CAC512EBF68AD1FF0A52 99511~|~1~|~1~|~01/IMS~|~Project to strengthen the under reinforced concrete pier caps of Bridge HAM-71-3.81 using Fiber Reinforced Polymer wraps.~|~~|~9AC5ADA2EFC3C4250197D5E80DAF8E3693A6E993 104796~|~1~|~1~|~01/NHS~|~Rock fall cleanup.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~16AEF25B6E9DFD16C965EFB3A527D483722329F4 120719~|~2~|~2~|~02/NFP/ZANE~|~Plan split for Non-Federal Eligible resurfacing within the City of Zanesville.~|~05 - 4R Maintenance - Resurfacing~|~9EEBFE8A052ED951D321B4D896407D70C980F599 120719~|~1~|~1~|~01/S50/ZANE~|~Resurfacing of Federal Eligible routes within the City of Zanesville with STP/Large City funds (4TA7 @ 80% Federal/20% LNTP).~|~05 - 4R Maintenance - Resurfacing~|~D2B5649CF618DEBE2B899B7D8A8B0D58E9192455 108777~|~1~|~1~|~01/BRF/CCEO~|~CEAO Local Bridge Replacement (LBR) Program - 4B87 (80% Federal) / 4BG7 (20% Local Match - CAP (See comments) - Replacement of Cos-CR 365-00.08 SFN 1630016 CR 365 Road over Mohican River~|~10 - Bridge Replacement~|~41D89FB0DB64D44C55B58D799070805EEDAC650B 124922~|~1~|~1~|~01/ENH~|~Improve five sections of the Olentangy Trail and Scioto Trail including signs, pavement marking, vegetation removal to improve sight distance, and addressing hazardous pavement conditions such as root upheavals, cracking, and standing water with partial and full-depth asphalt concrete resurfacing, overlay, and crack sealing.~|~28 - Facilities for Pedestrians & Bicycles~|~B1BA0686683ED64414BEDA03FB65B12311D0972B 118668~|~1~|~1~|~01/NFP~|~This project is the District?s long line maintenance contract to maintain the center line, edge line, lane line, and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district.~|~21 - Safety~|~DEC3BD88F46EBCA426B48688E32EAE50D4B05253 105743~|~1~|~1~|~01/IMS~|~Plan split for pavement replacement~|~04 - Reconstruction - No Added Capacity~|~B6D5B1D7CEC54CF699DA141EDCB5682255BD7BC2 105743~|~2~|~5~|~05/IMS~|~Plan Split for miscellaneous repairs to existing retaining walls along IR-77~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F670BD546E78E4D8609DE84E4BFE3E5C3DEA2855 105743~|~2~|~4~|~04/IMS~|~Plan split for bridge maintenance work on overhead bridges.~|~47 - Bridge Preventive Maintenance~|~E7942DA23E240C13F1D9C4590076CB17CA248952 105743~|~1~|~2~|~02/IMS~|~Split for work to replace the bridge over the old W&LE RR~|~10 - Bridge Replacement~|~A1BD6BD650F8D0E05543B9BDD053F1CAE5EC8EF3 105743~|~1~|~3~|~03/IMS~|~Plan split for the removal of the pedestrian bridge and complete the removal of the deck and approach slabs from the retired industrial bridge and furnishing wingwalls to incorporate the new roadway section for the the Ruffini court bridge.~|~40 - Special Bridge~|~48B7FF9FED21F9E3A5587904DAE22B8CB36E9A5D 86926~|~1~|~1~|~01/BRO~|~4803094 LUC IR75 2.34 Intersect: Indiana Ave~|~10 - Bridge Replacement~|~6FC0175290637964927269CB3E0AC82BEF86FDF9 97163~|~1~|~1~|~01/S>2~|~Resurfacing Portage Street from Lorraine Ave to Frank Avenue in Jackson Township.~|~05 - 4R Maintenance - Resurfacing~|~77C9F64A6AD37B1C82D6C4D9E998BF22EAFD6F62 93173~|~1~|~1~|~01/SAF~|~Safety funding for medians, access points, signals on West Broad~|~21 - Safety~|~EFE86FF973F7B37C1DF59A1BC593F1D9C6A61413 93173~|~1~|~2~|~02/NHS~|~Resurfacing, drainage improvements, and other items not paid by safety funds~|~05 - 4R Maintenance - Resurfacing~|~6C43EB2E28252D8201FD809CA590F1DA478BA63B 93173~|~1~|~3~|~03/NHS/Cols~|~Costs to relocate Columbus utilities that were not previously relocated.~|~05 - 4R Maintenance - Resurfacing~|~73A83B7018B4F4CE734403BF5D68719819CC0959 95004~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split~|~44 - Other~|~0EEB6639C76D3C197705335EEAA3558637C3B563 117216~|~1~|~1~|~01/STR~|~Replace deck on UNI-36-15.11 over Mill Creek~|~13 - Bridge Rehabilitation~|~FD9D9F90DF97630791BD6320FEF2D954EBD17517 114865~|~1~|~2~|~02/IMS~|~Resurfacing of I-77 south of SR 8 and I-77NB to I-76 E and W ramps.~|~05 - 4R Maintenance - Resurfacing~|~FB018085954F19402DF2575629D32EB34DF05F4E 114865~|~1~|~4~|~04/NHS~|~Resurfacing of existing SR 8 thru lanes.~|~05 - 4R Maintenance - Resurfacing~|~7DC7498B11113C33A13E6A3E81D9EF7BDD675889 114865~|~1~|~1~|~01/IMS~|~Reconstruction and extension of SR 8 SB ramps to I-76 East and West.~|~04 - Reconstruction - No Added Capacity~|~20CC3B3A215E5F8B2B1EE55E104588340B2E5D8C 114865~|~1~|~3~|~03/NHS~|~Adding additional lane to SR 8 northbound and southbound.~|~03 - Reconstruction - Added Capacity~|~B74956D2CDCA29F1D83CC874428C43E5353B4715 114865~|~1~|~5~|~05/IMS~|~New bridges carrying the new I-76-77 on ramps over Exchange St and former Beacon St.~|~08 - Bridge - New Construction~|~491EDB99F71C5481844C20F46F4C932F8E8ECB2E 114865~|~1~|~7~|~07/NHS~|~Bridge rehab SR 8 over Exchange St.~|~13 - Bridge Rehabilitation~|~2757B784A17EAAA5CF2129F2DB53603C507A7CE9 114865~|~1~|~6~|~06/NHS~|~Carol St to SR 8 SB (SFN 7700372) and New Carol St bridge over SR 8 (SFN 7700373).~|~08 - Bridge - New Construction~|~8679C21B526730282248F9EAA713B164A3E07EDC 100733~|~1~|~1~|~01/BRO~|~All work to replace bridge is in this split. This structure's sufficiency rating or deck summary rating is not low enough to be eligible for federal funds for a bridge replacement. Funding is federal and state funds from the District Preservation Program SACs 4PF7 and 4PS7~|~10 - Bridge Replacement~|~BFC4532C6F385B8BBB7DFDDA3D6E4F45CF2AFFF0 97373~|~1~|~1~|~01/NHS~|~Culvert work on NHS System (PIC-23, UNI-33)~|~44 - Other~|~0C996C62F6D714B34F7F7CA57DC22F95324F65D1 97373~|~1~|~2~|~02/STR~|~Culvert work on SR 207~|~44 - Other~|~45C3A889C7CCE3A10E550A90A012029046877456 94199~|~1~|~1~|~01/IMS~|~Resurfacing on I-75 to hold over until TRAC projects widen the roadway. Resurface all lanes and ramps of I-75 from Shepard Ln to Glendale Milford. HAM IR 75: SLM 12.58 to 14.56~|~05 - 4R Maintenance - Resurfacing~|~09673AC193C9F8032B82A287D6D5997468B826EC 114626~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~5E4E05C506440FCF3C86A0B45C401A66EA0A87B1 125058~|~1~|~1~|~01/NFA~|~Resurface Metro Park entry drive~|~05 - 4R Maintenance - Resurfacing~|~B2E2CC11B66D75F7DE2C76061927400A30657E04 126335~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~0B807208B3D825ED32117BABF2CDAA7999B18ED0 106863~|~1~|~1~|~01/S>2~|~Plan split for federal urban paving eligible work~|~05 - 4R Maintenance - Resurfacing~|~AD51BBAED19D6B97043247474CE1C1271DC2CAF5 106863~|~1~|~2~|~02/NFP~|~Split 2 for work not eligible for the urban paving program. ~|~05 - 4R Maintenance - Resurfacing~|~2A00E6A026368F6D7D1FD27378E9F419B4C5046E 106863~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~433480247BD40305BC0460024A893CEB06DE8BF1 94494~|~1~|~1~|~01/MPO~|~Reconstruct Intersection of SR-48 and Mason Morrow Millgrove Road~|~21 - Safety~|~11B2963C18E906B08FD935A7E3207E36F5627E95 87320~|~1~|~1~|~01/STR~|~general system resurfacing of TUS-212; includes pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~FA290E9CEE86E2F14FBC2B18499AA329435C45CC 102993~|~1~|~1~|~01/BRF~|~01/BRF/BR/JEF - CR 17 3.88 Bridge replacement over Rush Run; 80% 4C87/20% LNTP.~|~10 - Bridge Replacement~|~DEB5268DE6213AE3D9D672AC0193C068694BE224 115231~|~1~|~1~|~01/STR~|~Slide repair~|~04 - Reconstruction - No Added Capacity~|~540095A20B6765909DF166DB116DF752EC6E0CB2 106185~|~1~|~1~|~01/MPO~|~Construction of a bike path bridge over Hutchinson Road (west of Filview Circle, at the old RR bridge location) to connect the Harrison Avenue bike path on both sides of Hutchinson Road.~|~~|~338420F84BA67B5D1FDF21770FA1AB00F6912160 117041~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~A8AEC7331001835B0BBEC0F374021C31465BC725 119330~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~FE40DF27073A6A3574A55A61A7BA2547025A19F8 105183~|~1~|~1~|~01/NFP~|~Painting bridges on the state system~|~47 - Bridge Preventive Maintenance~|~FA7D80D48D773195716DA5869B3E03F232910641 103397~|~1~|~1~|~01/STR~|~Landslide repair utilizing a drilled shaft wall with cribbing. ATH 329 9.57. Work length approximately 250 ft. DSR ATH-004.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BE932BADE0CE94E5165228DFD694D5713DC1539E 113584~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~4BC6E5BAC7BD6C11FD7458DB1ED2C640DE4742BA 106143~|~1~|~1~|~01/IMS~|~Reconstruct STA-IR 77 SB western embankment around SLM 1.27 due to erosion from nearby creek.~|~04 - Reconstruction - No Added Capacity~|~764CFBEEE2C4FDD3C363297F871FF3285B85B913 125492~|~1~|~1~|~01/STR~|~SR-2 widening and rumble strips SLM 6.12 - 9.16~|~21 - Safety~|~6B97F54CCE3A611E2B991A7BDCBB14F1A4097B32 125492~|~1~|~2~|~02/STR~|~Resurfacing Plan Split SLMs DEF SR-2 3.810-6.12, 9.16-11.136, 13.172-16.518, and WIL SR-2 0.00-1.268~|~05 - 4R Maintenance - Resurfacing~|~694A8D82A681051533BF4CA85C439BA9C1749AE7 106665~|~1~|~1~|~01/ENH~|~Rehabilitate Great Stone Viaduct, includes trailhead, bike/ped path, lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~C44B18C2DBE8263FCF005B0141AC7E86B4167983 85356~|~1~|~1~|~01/BRF~|~"01/BRF/BR/MUSK" Muskingum County Park project - Replace the northern most stream crossing with bridge structure that can handle vehicle and pedestrian traffic. Improve and extend the existing roadway to small parking area~|~~|~BA2B2A4D6D96D08298FE4D33337812509B108CD8 107792~|~1~|~4~|~04/S>2~|~Items of work to be paid 100% by the City of Columbus.~|~05 - 4R Maintenance - Resurfacing~|~45F8148353C1F8253D8271808FD1068194F8A543 107792~|~1~|~1~|~01/NHS~|~NHS Plan Split (Priority System): FRA-161 (Including CD Lanes): 14.31-14.86 15.06-16.56~|~05 - 4R Maintenance - Resurfacing~|~0BEACA5283A4AA895C2766FAAD4992110FBCCFD5 107792~|~1~|~2~|~02/S>2~|~Urban Paving Split (City of Columbus): FRA-161: 14.02-14.31 14.86-15.06~|~05 - 4R Maintenance - Resurfacing~|~87743AF8BE72B23017431E5CACCDAFFF73F012CD 107792~|~1~|~3~|~03/BRO~|~SFN's 2509059, 2509083, 2509105, 2509091, 2509199, 2509520, 2509563, 2509644, 2509539~|~47 - Bridge Preventive Maintenance~|~93E1168A6AA8EA5C429A6EE411F110D12800BA16 83599~|~1~|~1~|~01/BRO~|~Replacement of SFN 0402257 over Northfork and Southern RR~|~13 - Bridge Rehabilitation~|~EB316478E5B0E4AE48E45AE73D908B4489366273 83701~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~BD74BA18D1D57F972D9EB8C0DE713653CDDF0491 96728~|~1~|~1~|~01/NFA~|~Summit County Interchange Outpost, upgrade floor drains and tie into Sanitary Sewer and Water. Project to be determined by possible Industrial Park NE of facility~|~44 - Other~|~F4F71C1932987D7485914B92224A82942F4DDCDA 122300~|~1~|~1~|~01/IMS~|~Noisewall construction along IR277~|~20 - Environmental Only~|~1ACDD65EEAF5D42579553BDACA343627B4571BC2 93756~|~1~|~1~|~01/STR~|~01/STR/BR/ ; ALL-103-0152, SFN 0203602; 80% Fed (4PF7) - 20% State (4PS7) - No Cap~|~10 - Bridge Replacement~|~A54F66CD6F32D72023D467615206C1D59A35B6CF 92170~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maintenance funds for 1 year~|~44 - Other~|~C134A031FCFB3E752BBC788DA49B7FC545B623B9 104874~|~1~|~1~|~01/MPO~|~Work TBD.~|~~|~6A71D7D8617278EAA4D162BE5BB69A9EFCD7044A 119893~|~1~|~1~|~01/IMS~|~150ft landslide on IR 77 at 12.36mm.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4D6E76DD8CB795A47742B0BA12BB93698EEEE8F8 105382~|~1~|~1~|~01/IMS~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~D232E8E9914284CE4E48A5F6C8F64993D5258952 105382~|~2~|~2~|~02/IMS~|~Resurface the pavement and minor repairs to curbs and catch basins within the rest areas.~|~05 - 4R Maintenance - Resurfacing~|~DA60C10D1E3125216B6E4FDD24E9E3CC7E222629 113312~|~1~|~1~|~01/MPO~|~work eligible for federal-aide.~|~05 - 4R Maintenance - Resurfacing~|~27700CD68C1CB3943128BA5DAF6F31EABED3A447 121828~|~1~|~1~|~01/NFA~|~installation of 3 EV charging stations in City of Fairfield~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~690CE2B443AA8425B9CC378111C9D67B38E5AF50 121664~|~1~|~1~|~01/IMS~|~Replace overlay and approach slabs~|~13 - Bridge Rehabilitation~|~BBC881EE8A80113BACF19E40D6000F159FAA0E71 91789~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip seal treatment. VIN 327 0.00-4.94. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E64BECD639F244EC2B118E42834178520889AB3F 91789~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project using a chip seal treatment. VIN 671 0.00-4.58. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~D81B0A218E53C6129ECF4F2C23E5D278C82E0CC9 108958~|~1~|~1~|~01/SAF~|~2021/2022 Traffic Signal Maintenance.~|~21 - Safety~|~FC0309D2D5BBCDE6A895127D1E7AC4BAA3923F3C 123750~|~1~|~1~|~01/S>2~|~STP >200,000 plan split~|~05 - 4R Maintenance - Resurfacing~|~58D74964DDD8FD53BBAF3ACC4322AF0F1FA92A67 105477~|~1~|~1~|~01/STR~|~CREATED CO CO Contr 01~|~05 - 4R Maintenance - Resurfacing~|~897B37A1676A2AC48BECDECBD4BE12626EDE309B 105477~|~1~|~2~|~02/STR~|~CREATED CO CO Engr 01~|~17 - Construction Engineering~|~5CA3CDE10FDC92204AA231885FB22E3E90076BB9 106714~|~1~|~1~|~01/NFA~|~The City will construct approximately 1250 of new roadway starting at the end of Mclane Drive and to the west.~|~01 - New Construction~|~ABB347DA50DE7323416622A5675EFF3CC24FBC07 112742~|~1~|~2~|~02/STR~|~WAY SR 0301 04.64~|~04 - Reconstruction - No Added Capacity~|~E0385A6DD263A27EE3C01E3D9AB9CCB59CB361C2 112742~|~1~|~1~|~01/NHS~|~WAY US 0250 25.67~|~04 - Reconstruction - No Added Capacity~|~AC146B8F903B2B1E5787636779D8C0699FEE3786 112742~|~1~|~3~|~03/S5K~|~WAY SR 0585 06.20~|~04 - Reconstruction - No Added Capacity~|~B8BBD3C0DA91E4F69922489FD6BA6E01308F1FF9 98919~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County.~|~21 - Safety~|~1DF41858727C0C745D9A8A0250ED87F1C53B02CD 118154~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C19647498083AF24D4B1856E10BCBFEA199A3979 107566~|~1~|~1~|~01/NFP~|~This project is the district's long line maintenance contract to maintain the centerline, edgeline, lane line and interchange pavement markings with fast dry paint on those routes in the western MQS quadrants of the district.~|~21 - Safety~|~2B03CEC43F36547B55F4CFE00847C928055DC107 111051~|~1~|~1~|~01/SAF~|~Pavement markings on various county routes throughout Stark County.~|~21 - Safety~|~62A5EAC967486BE7D553A469411F8ADD9277A3B4 109579~|~1~|~1~|~01/SAF~|~Safety funded project for intersection lighting, signal controllers and pavement markings on WAS 7 24.86-24.98 (County House Lane CR 344). Funded 100% Safety.~|~21 - Safety~|~16D42DE511B0FE9B99C9AAA30EF0C4E74C92D3C5 110607~|~1~|~1~|~01/NFP~|~Split for sign structure repair~|~21 - Safety~|~9E4157941ACC8E97F5ACB271E512610712203E58 125380~|~1~|~1~|~01/SAF~|~Lighting Maintenance~|~21 - Safety~|~A563253C9AD3860E6AF06513C8F9EA36CD12FF26 126415~|~1~|~1~|~01/BRF~|~Plan split for work associated with bridge rehabilitation to off system eligible bridge.~|~13 - Bridge Rehabilitation~|~F5632C7E92CD1355F74E3A66F2867EA9604BD758 101620~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation - 4PF7(80% Federal)/4PS7 (20% State) - No CAP - Resurfacing of FAI SR 664 0.00 to 7.47.~|~05 - 4R Maintenance - Resurfacing~|~062E6462579A1289ECBF6362F3CAD00198EF154F 101620~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation - 4PS7 (100% State) - No Cap - Resurfacing work on FAI-312, PER-312, HOC-312.~|~05 - 4R Maintenance - Resurfacing~|~D958E215AE624FB6CCD77C1758D75D8C94EB9A35 87222~|~1~|~1~|~01/STR~|~0100846 ADA SR41 4.29 Intersect: Richley Run 80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~DEF62B11E0B18DB941A57B542A97A13D4A814E8F 110393~|~1~|~1~|~01/STR~|~Resurfacing SR 43~|~05 - 4R Maintenance - Resurfacing~|~21C5EA6E75070F276624387914A366C13915697D 110393~|~1~|~2~|~02/SAF~|~Centerline Rumble Stripe work, including Longitudinal Joint Preparation~|~05 - 4R Maintenance - Resurfacing~|~F62FE316CF7BC665616197D01B1E48846575FA1A 114273~|~1~|~1~|~01/IMS~|~Mowing contract in D8~|~99 - State Preventative Maintenance~|~6DD285A70C6F7BE155C4EC9604B0DF36C6189058 115428~|~1~|~1~|~01/NHS~|~Plan Split to program project. Revise at Scope Complete.~|~13 - Bridge Rehabilitation~|~BAF23696E712312053A03E6C1588901141457021 124609~|~1~|~1~|~01/NHS~|~All work associated with the bridge repairs.~|~13 - Bridge Rehabilitation~|~28CA280B6E76158027097A5EE50C70F352C1E44A 108718~|~1~|~1~|~01/STR~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-013~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3BC37D903897C9423ED0B9D7F1CE69A0D0D8EE4B 108718~|~1~|~2~|~02/STR~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-012~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4365162B7AFE1A3970161FD485E92BB9793E0D2A 106118~|~1~|~1~|~01/S>2~|~Cycle track and lighting in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~555BE926421946EF9B80F5835CF9E5E1AB342D05 83922~|~1~|~2~|~02/NFA~|~Resurfacing existing roadway along with other roadway related items on AUG SR 364 from 5.71 to 9.72~|~05 - 4R Maintenance - Resurfacing~|~559822CE5BFDABE1CF94331B25456A569F07728B 83922~|~1~|~3~|~03/STR~|~Remove and replace wearing surface of SFN 0603392 AUG 274 0294 on the St. Marys River with asphalt overlay with Type 3 Waterproofing. Also Removing and replacing existing polymer joints.~|~13 - Bridge Rehabilitation~|~E7ADC31EC43B2CE2E3AD3FDA753D88DCB7FBCD5E 83922~|~1~|~1~|~01/STR~|~Resurface existing roadway along with other roadway related items on SR 274 from 0.00 to 3.15.~|~05 - 4R Maintenance - Resurfacing~|~F56BEE9B4818E2681BDC217B85C5E4C2127F229E 97899~|~1~|~1~|~01/NHS~|~US 36 (East Ash Street) from Centre/Scott Drive to Looney Road - construction of a seperated bike lane and pedistrian facility and the installation of tree plantings.~|~28 - Facilities for Pedestrians & Bicycles~|~584642B3261869F4072A1480B5DA912CBF620E26 119124~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~597F11AD8D1378C16E566E1BA222F16EF77ADC18 122786~|~1~|~1~|~01/STR~|~D10 Lighting Project FY 2030~|~21 - Safety~|~D7F587A0D9B6595F0B4389B07B0782CD3DA96C8A 101081~|~1~|~1~|~01/STR~|~Overlay US 36 in Chanmpaing County: CHP US 36 SLM 0.00 to 12.41~|~05 - 4R Maintenance - Resurfacing~|~5FEB2F007E2F9ED0598082DCBDF718A5C0D95A78 101081~|~1~|~2~|~02/S<2~|~Overlay US 36 in Champaign County: CHP US SLM 12.41 to 13.84~|~05 - 4R Maintenance - Resurfacing~|~E8D4788727C776851F87B763858E4A51CF676985 101081~|~1~|~3~|~03/NHS~|~Overlay US 36 in Champaign County: CHP US 36 SLM 13.84 to 14.08.~|~05 - 4R Maintenance - Resurfacing~|~EEF1AF04DA0AE3EC5BCCF58B658476733F19DCEF 119939~|~1~|~1~|~01/NHS~|~Bridge Repairs on LOR SR 0002 at 00.97R and 07.42R.~|~13 - Bridge Rehabilitation~|~EFEF5836306C911DF0B520C6E8E0776D43B9E459 113225~|~1~|~1~|~01/NHS~|~State Emergency Funding - (4BE7 100% State) - See CAP Comments - Replacement of the inlet apron and cutoff wall on SFN 4501233~|~13 - Bridge Rehabilitation~|~F498D73C21D4B1D5C7ED727B1C8BCBB4FDDEE430 110635~|~1~|~1~|~01/STR~|~Bridge Replacement7302371 SSCISR00073**C 5.1207302401 SSCISR00073**C 5.21~|~10 - Bridge Replacement~|~2084044041D306BD84DF36C6B4FD10F786D06D6E 107457~|~1~|~2~|~02/IMS~|~Minor bridge rehab > 20' span.~|~13 - Bridge Rehabilitation~|~F36664E5403828466C66E62AA860938ADF6C0726 107457~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F6E5E594760D60487734E67F7A6FE92253432389 117013~|~1~|~1~|~01/MPO/XEN~|~Resurfacing of Bellbrook Avenue from S. Allison Avenue to W. Second Street~|~05 - 4R Maintenance - Resurfacing~|~83D17CFA4291F82A89E574B3BADAA46C2C8B66CB 124056~|~1~|~1~|~01/SAF~|~Plan split for federally eligible work items paid with safety funds.~|~21 - Safety~|~DF34E54981089711311C42893C9A9AC27C166F85 95371~|~1~|~1~|~01/NHS~|~It is proposed to removed debris from the piers and abutments of the following structures.4402014 District 9 SLAWSR00093**C : 26.370 6600573 District 9 SPIKUS00023**C : 11.560 6601669 District 9 SPIKSR00032**C : 13.740 6601146 District 9 SPIKSR00124**C : 5.990 7103301 District 9 SROSUS00050**C : 19.260 7104189 District 9 SROSSR00159**C : 0.420 7105657 District 9 SROSSR00772**C : 15.140 100% Maintenance Funds~|~13 - Bridge Rehabilitation~|~52530B2E9674B0DF8224FC7ECA268A3A7A2BDF7B 126394~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~F8F41B75BD7DBC18B9FB4B19CAF9A856219FD89A 109190~|~1~|~1~|~01/STR~|~Resurfacing project on MOE CR 12 8.80-20.16. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~AA0197700F8DEB80B6B09DBD9279F72ED10712BD 98878~|~1~|~1~|~01/MPO~|~SR 169 from Robbins Ave to E Federal St, Lighting upgrades only.~|~21 - Safety~|~5485C00FD7EC4B7A01FB02659B34AE1821731F01 113961~|~1~|~1~|~01/MPO~|~Rehab eligible items.~|~04 - Reconstruction - No Added Capacity~|~C88D2155FD1B7B824801BCA7B155BD4F68E7D440 113961~|~1~|~2~|~02/ENH~|~Non-eligible items. ~|~04 - Reconstruction - No Added Capacity~|~36884DAE17FB98069ED7DC18CE6AFD859DC04BF3 106697~|~1~|~1~|~01/STR~|~Rehab rural bridge.~|~13 - Bridge Rehabilitation~|~B77CB79C31754C39575AA2DC0B9A5D3322A95725 109921~|~1~|~1~|~01/NHS~|~BRO 32 0.00-5.77~|~05 - 4R Maintenance - Resurfacing~|~7721EB00F02E09A6BA9D6CAC6E8C5B1B8152E1FC 97853~|~1~|~1~|~01/STR~|~Reconstructing overhead flashers, no pavement work.~|~21 - Safety~|~1C58A4EC7317DC7DDB4093146B974805792D30A6 84633~|~1~|~1~|~01/NHS~|~BRO SR125 SLM 6.42 - 10.84 & US68 SLM 12.13 - 17.68 Resurfacing ProjectBoth routes are NHS.On SR125, begin 0.25 mile east of TR402 & terminate @ overlap w/US68; on US68, begin 0.1 mile south of TR2 & terminate @ SR125, it is proposed to resurface the highway.80/20 split ~|~05 - 4R Maintenance - Resurfacing~|~07A86BE217AAA6343B92A4D0BD6717657CE8305E 84633~|~1~|~2~|~02/NHS~|~BRO SR125 NHSBrdgs to Rehab: 0802247 BRO SR125 9.230 80/20 split ~|~47 - Bridge Preventive Maintenance~|~2C7D718759DF7A27BE3D6DCF89128FC3D6FE20B2 109750~|~1~|~1~|~01/S<2~|~01/S<2/PV/ : Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~733E6E51A507DDECA77423D4D4767E91D39CB655 109750~|~1~|~2~|~02/STR~|~02/STR/PV/ : Plan Split 2~|~05 - 4R Maintenance - Resurfacing~|~A1D15A969ABBA1765E4ED98B23E769A20DE0C7D4 76721~|~1~|~1~|~01/NHS~|~Complete pavement replacement.~|~04 - Reconstruction - No Added Capacity~|~02CDCF5292C520456ABD3126A40BA0A0061F925A 76721~|~1~|~2~|~02/NHS~|~Bridge work on the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~82431D6CD0DC1C9AA31B3797CA3AB715A74B0C49 76721~|~4~|~5~|~05/NHS/BHTS~|~Slope repair on CVNP trail between SR 8 and Cleveland Massillon Rd.~|~44 - Other~|~70A2A2263193DD92016CDA14AF0ED4E5A2D21E14 76721~|~2~|~3~|~03/NHS~|~Construction of noise wall on the West side of State Route 8, between Hampshire Road and Treeside Drive, in the City of Stow, Summit County, Ohio.~|~44 - Other~|~CCC9A628A1DB9A4C274B9C95035ED4FC9D8EF21F 76721~|~3~|~4~|~04/NHS~|~Miscellaneous noise wall repairs along IR 77 in Stark and Summit Counties.~|~44 - Other~|~9755EE8BC43489C88908ABAF4D297BC66FF39360 76721~|~6~|~6~|~06/IMS~|~Noise Wall repair to I77NB right side at 133.79 by change order.~|~44 - Other~|~CC7E1E37D5F1431CF20379140153E0C4F3510643 110157~|~1~|~1~|~01/S<2~|~Bridge repair~|~13 - Bridge Rehabilitation~|~0630B3615B55C7731D8E6E0EE005F0BB4E1FCCF5 110157~|~1~|~2~|~02/NHS~|~Bridge repair~|~13 - Bridge Rehabilitation~|~410A45A3F14AD7999DE321A65640DF05329571D2 110157~|~1~|~3~|~03/IMS~|~Bridge repair~|~13 - Bridge Rehabilitation~|~6B10E3041D71D126C64A653D4D3B79797BCD1231 113223~|~1~|~1~|~01/SAF~|~ROS 159 signal upgrade.~|~~|~59E8217598EB54D9D1A75FC6CC4D223AE1D20250 108719~|~1~|~1~|~01/S<2~|~Landslide Repair, ER Event# OH18-01, DDIR# BEL-028~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~365A5E1BE930E4910306E64BABFC7ED26C9AC8B4 108719~|~1~|~2~|~02/S<2~|~Landslide repair, ER Event# OH18-01, DDIR# BEL-029~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F211CE3323665294B56D4FF9EA8075CA7BDC0024 108719~|~2~|~3~|~03/S<2~|~Landslide repair, ER Event # OH19-01, DDIR# BEL-004~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D3B399097AF0986AA9B34778790A1AE481C7BC4E 83453~|~1~|~3~|~03/BRO~|~Bridge Painting - sfn:8506213 / WAY-585-16.47~|~13 - Bridge Rehabilitation~|~153F8DFFB13AE047BB246A4BBB459DE6FAA7F56E 83453~|~1~|~2~|~02/STR~|~Bridge Painting - sfn:8504083 / WAY-094-18.03~|~13 - Bridge Rehabilitation~|~8C2E648B3F5AD3650EF38012B7C4DAD43CCC50F9 83453~|~1~|~1~|~01/NHS~|~Bridge Painting - 5 structures WAY County~|~13 - Bridge Rehabilitation~|~8F6FDD11C0CC7AD59864C7E4EC10FC267775F6BD 123764~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance work~|~47 - Bridge Preventive Maintenance~|~31FB9C4CF96030AD0CBBB467F047F3EF187AEDF5 105542~|~1~|~1~|~01/NHS~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - Replacement of the superstructure and abutments on SFN 6000150 Mus-SR 16-12.99 carrying SR 16 over Grahams Creek~|~13 - Bridge Rehabilitation~|~1F067BF43D194A053844443A4A19BAA8E366F632 122204~|~1~|~1~|~01/SAF~|~Plan Split for SRTS and HSIP funded scope~|~21 - Safety~|~702C2A94B8279E8D5DD2F797A54D52EB495A4C88 118709~|~1~|~1~|~01/NHS~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~34D7EC6FDCD076E7B1B2FB6D8E41C7AAE69C1FC9 102042~|~1~|~1~|~01/NFA~|~The city is constructing a new road off of SR585 (Akron Road) to support the growth of Luk USA.~|~01 - New Construction~|~398133BCD2EE3C75D294BDC032D8DBA5CD735DC0 93848~|~1~|~1~|~01/IMS~|~Bridge painting project. WAS 77 4.73 L (SFN 8403066), R (SFN 8403090), 6.78 (SFN 8403155), 7.98 (SFN 8403244), 9.73 (SFN 8403309) and 10.34 (SFN 8403333). Work includes bridge painting and beam repair on WAS 77 1637 L (SFN 8403511), WAS 77 1637 R (SFN 8403546), WAS 77 1687 L (SFN 8403570), and WAS 77 1687 R (SFN 8403600). Interstate work funded 90 federal/10 state.~|~44 - Other~|~2E0911FCDD7B21A6E4F085FDEC9BE7D6CE708402 92608~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~70D60254EECAB14178CE4B71850BF8F4A1DE69FD 98536~|~1~|~1~|~01/SAE~|~District Wide contract for PM/RPM in District 8 for FY2019. Routes to be determined~|~21 - Safety~|~E9983E2C5BB56D5E35A5DD8AA63780E9FFFABC16 91759~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MRG 37 8.22-9.83. Federal 80% and State 20%.~|~17 - Construction Engineering~|~5FB393F807C97E53AC80B45A5B3033DE1BDCA210 122280~|~1~|~1~|~01/MPO/SCEO~|~Construct new roundabout.~|~21 - Safety~|~3CDD53CCEABE78EA7BF187EA3485D5D5DCEDA9BB 97689~|~1~|~1~|~01/NFP~|~Remove PTSWF signs and install radar based dilemma zone detection at various locations~|~44 - Other~|~02FED03D60A9271E45480D66E4B66D05A50C724D 108847~|~1~|~1~|~01/SAF~|~Install approximately 35 CCTV cameras at various locations throughout the State~|~21 - Safety~|~B546F39F415AF58215C3FAA4DBC2B10C884167FA 98274~|~1~|~1~|~01/STR~|~Preventive Maintenance - Chipseal~|~05 - 4R Maintenance - Resurfacing~|~1DE500FD0EC805A870A67B541A34A09773B3ABE5 121517~|~1~|~1~|~01/SAF~|~Signal & Lighting replacments~|~21 - Safety~|~95F2E47F0E8E4BEDE2B24CE6D02FB9C272CBF5F7 94622~|~1~|~3~|~03/SAF~|~100% local items (Sanitary Sewer)~|~21 - Safety~|~9A5C8546DC23755B3FA7809FC15AE7791E165913 94622~|~1~|~1~|~01/SAF~|~Relocation of Chester Road to align with Recreation Parkway.~|~21 - Safety~|~A07E602481C2AE2013431E0E089FD9863F9A8B0B 94622~|~1~|~2~|~02/SAE~|~Relocation of Chester Road at SR 611.~|~21 - Safety~|~A27E6E032A2298784B36B1E389448D6EF767BE77 99474~|~1~|~1~|~01/SAF~|~SCI SR 104 11.91~|~21 - Safety~|~D450F21424EF1FCCFE7C549CDFC5317B76A25A76 92004~|~1~|~1~|~01/NFA~|~Bikeways added to Warren Riverwalk-Lovers Lane~|~28 - Facilities for Pedestrians & Bicycles~|~FC2B9CB9AF04AB43EB72AED6411826698DD6A0E3 109629~|~1~|~1~|~01/S<2~|~Emergency repair on BRO 41 1.06.~|~04 - Reconstruction - No Added Capacity~|~1054E8DDECE792B04DB83117C8D78547A265B022 100348~|~1~|~1~|~01/NHS~|~Airway Road from the west corp limit to Harshman Avenue in the City of Riverside Improve pavement condidtion by milling and resurfacing with asphalt concrete, improving drainage and spot repairs of curb and sidewalk.~|~05 - 4R Maintenance - Resurfacing~|~FBBA93874A458572CF863ECA60C920319B301BE3 100348~|~1~|~2~|~02/SAF~|~Creating the positive off-set for the left-turn lanes on Airway Road and converting the signal operations from permitted to protected left turning movements on Woodman Drive and Burkhardt Road.~|~21 - Safety~|~3E4A1552BF2750E587B1F8E1EE8A25A312361791 100468~|~1~|~1~|~01/NFA~|~HOL-179 Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~1BADE6CF06EC01EE3826F1388CBFE241F4FEA0C3 120705~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with Repairs.~|~05 - 4R Maintenance - Resurfacing~|~2042CC52AA5394FC3A8F3CB60A680F35080E635F 120802~|~1~|~1~|~01/SAE~|~Cable median barrier on I-74 from Indiana state line to I-275~|~21 - Safety~|~7BA58B26228C7409BF65D98429E8F4F0732E62A7 82838~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. MEG 689 0.00-4.16 and VIN 689 0.00-3.36. Rural other federal aid using 80 federal/20 state funds.~|~05 - 4R Maintenance - Resurfacing~|~AFEE3FCA1381586BB9EB82B7348A8B34427AFD9B 97271~|~1~|~1~|~01/NFA~|~Construct a new parking lot and service road at the Lockwood Trailhead to service the Western Reserve Greenway Bike Trail.~|~28 - Facilities for Pedestrians & Bicycles~|~A29D0F6EFD15CAC5AE2D998128F3A470CD673CD8 105526~|~1~|~2~|~02/NFA~|~Work on SR 231 in Wyandot County from CR 430 at SLM 10.34 to SR 103 at SLM 17.87. This section of SR 231 is a minor collector and is not eligible for federal aid. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~A834164D2B45F773401B73FDC06DC4ADD82EFDB5 105526~|~1~|~1~|~01/STR~|~Work in Wyandot County on various routes. On SR 67 from SR 103 (25.86) to the north corporation limits of the Village of Sycamore (26.98). On SR 103 from SR 199 (7.26) in the Village of Carey to SR 53 (12.41), from SR 53 (12.96) to SR 67 (17.88) and from SR 67 (18.30) to the Crawford County line (21.31). On SR 231 from SR 67 (20.53) to the Seneca County line (22.95). All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~EB4BC38F2213BE8884CA10DD0287A1A9E6A42ECF 98743~|~1~|~2~|~02/NFA~|~Improvements made to Wikel Road.~|~44 - Other~|~6179DFBE1F319B6982BD72708441DBFBA6356C32 98743~|~1~|~3~|~03/NFA~|~Improvements made to Chapin Road.~|~44 - Other~|~7F7DC6189F069290C461CF8C767D63922CDA1820 98743~|~1~|~1~|~01/NFA~|~Improvements made on Frailey Road.~|~44 - Other~|~C1E60568E88C112D268AFA4E059661D50CD34E27 115844~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2028.~|~21 - Safety~|~8F4F25EC7F07E5EB4715F7EB05AD2A468EED89BB 124127~|~1~|~1~|~01/IMS~|~Interchange improvements~|~03 - Reconstruction - Added Capacity~|~8EC871C93A0A883070DE36AD9F1E09BA931324DB 95559~|~1~|~1~|~01/IMS~|~Priority System minor rehab. on TUS-77; included asphalt resurfacing to address any structural deficiencies, pavement repairs, guardrail reconstruction, and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~A9830CAACD616AC9EAC2AC4B67E761AFAD31945C 98746~|~1~|~1~|~01/NHS~|~US-20 culvert @ 24.85~|~44 - Other~|~6BDFDCDD99714017381EF0C2089B2C51CF9FCE0B 98068~|~1~|~1~|~01/STR~|~STP Rural 80/20 DEL-745-0.00 to 7.03~|~05 - 4R Maintenance - Resurfacing~|~D411431C383A4360789FBC32CC357A02C9FF251A 115464~|~1~|~1~|~01/NFP~|~Resurfacing Second Street Market Parking Lot~|~05 - 4R Maintenance - Resurfacing~|~969A17D4DD2275F676B6217563CBC7C600960DBB 94456~|~1~|~1~|~01/ERD~|~Earmark ID FL120 is an earmark with 100% federal pariticipation to be used for repairing a section of the culvert under Snowville Road approximately 0.3 mile west of Riverview Road in the City of Brecksville~|~44 - Other~|~4734701CE610582A82AAF564A43B74C301C41E92 99910~|~1~|~1~|~01/BRF~|~CEAO bridge replacement Phelps Rd over Bokes CreekSFN 8037787~|~10 - Bridge Replacement~|~4DF41A1D3D08A1F5EAA005263724BE826457264C 108912~|~1~|~1~|~01/NFA~|~Lightner Road improvement - MCTID~|~03 - Reconstruction - Added Capacity~|~6855991462A5463A32B5FE453477C6C9A411DA03 22132~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~13 - Bridge Rehabilitation~|~E30F49DC194C4C2D4C87A8F280E57980E48C7101 122639~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~CFEA9C3718EBAE85E75125FF98B7DBB2B45FA6C5 122639~|~1~|~2~|~02/S>2~|~Resurfacing.~|~~|~2BB4C3120E018D87F02B3298A843087ABC970299 96636~|~1~|~1~|~01/IMS~|~Plan Split for all work included in this mowing project. Mowing includes all interstates and interstate look-a-likes in District 8. Also includes trimming.~|~44 - Other~|~B65281206C2E48791F3C7F30DD0974D1B2C0D724 102530~|~1~|~2~|~02/NHS~|~District Preservation Bridge Funding - 4PF7 (80% Federal)/4PS7 (20% State) - No CAP - Bridge painting on bridges in COS and LIC Counties~|~47 - Bridge Preventive Maintenance~|~E2F4F1A1E459F6582ED397AB33242DD710A57E5B 102530~|~1~|~1~|~01/IMS~|~District Preservation Bridge Funding - 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge painting on various Interstate IR 70 bridges in Muskingum County.~|~47 - Bridge Preventive Maintenance~|~F23D6F9E122C7AF80B53F4C745E59E0647E04E52 107146~|~1~|~1~|~01/NFA~|~The Port Authority will rehabilitate approx. 1.3 miles of Airpark Drive.~|~01 - New Construction~|~3386310DAEC2CECBD4BB896C50F3C3F84E2FAE67 101083~|~1~|~1~|~01/STR~|~Overlay US 40 & US 68 in Clark County: CLA US 40 SLM 19.70 to 27.51~|~05 - 4R Maintenance - Resurfacing~|~F64E65E197C583792AA83B52DDB777A6D016D391 101083~|~1~|~2~|~02/NHS~|~Overlay US 40 & US 68 in Clark County: CLA US 68 SLM 0.00 to 4.46~|~05 - 4R Maintenance - Resurfacing~|~94F35DAC63D77AF46B56A57036CB1750AEE497CA 101083~|~1~|~3~|~03/S<2~|~Overlay US 40 & US 68 in Clark County: CLA US 40 SLM 18.74 to 19.70~|~05 - 4R Maintenance - Resurfacing~|~CD76F03F0D9752C073BC2FD64FCDCF6A0A2FA04C 101083~|~1~|~4~|~04/IMS~|~Interstate ramp paving~|~05 - 4R Maintenance - Resurfacing~|~390E751D78A320137C427BCFABB6110C3CF5BCE0 98722~|~1~|~3~|~03/NFP~|~This is for all ineligible urban paving items.~|~05 - 4R Maintenance - Resurfacing~|~EEA8CFFF04C99545ADF6A885F9F897B74A17406D 98722~|~1~|~2~|~02/S<2~|~SR-101 from SLM 1.30 to 1.64; SR-100 from SLM 9.84 to 10.05; SR-100 from SLM 10.21 to 10.45~|~05 - 4R Maintenance - Resurfacing~|~87C3B4AB58D516DD9CAFC4C94DE15440C4B9BD32 98722~|~1~|~1~|~01/NHS~|~SR-18 from SLM 13.00 to 13.26~|~05 - 4R Maintenance - Resurfacing~|~D2A3226EC0921F5D5E7924A518F5E532B3D18E7E 95537~|~1~|~2~|~02/STR~|~Bridges County/ Route County True Log Point Overall Length 0102776 ADA SR -73 10.440 167.3 0102563 ADA SR -73 3.920 45.0 0102466 ADA SR -73 0.460 119.0 0102822 ADA SR -73 10.440 31.0 0102520 ADA SR -73 3.350 210.0 0102741 ADA SR -73 7.900 75.4 0102806 ADA SR -73 10.440 131.0 ~|~47 - Bridge Preventive Maintenance~|~334D48BA54EB75A2AA7696430C9B324A05A33176 95537~|~1~|~3~|~03/NFA~|~HIG 785 3.25 (SFN 3604667)~|~47 - Bridge Preventive Maintenance~|~4AF88D201306DE0810B38FE37D599E6A64904F8C 95537~|~1~|~4~|~04/STR~|~ADA 73 5.73 (SFN 0102644)~|~04 - Reconstruction - No Added Capacity~|~796760F14D793694DAC7FCA8FA69BA8FF1477D2E 95537~|~1~|~1~|~01/STR~|~On SR73, begining @ the Highland Co. line (SLM 0.00) south for 15.58 miles and terminating @ the Scioto Co. line (SLM 15.58), it is proposed to resurface the highway with asphalt concrete.Skip the overlap with SR41 in Locust Grove.Pave Thru BridgesSFN 0102490 SLM 1.57SFN 0102709 SLM 6.77Skip Brdg SFN 0102679 SLM 6.4580/20 split~|~05 - 4R Maintenance - Resurfacing~|~B86DF99C6A36B604C9107B43C6250903453AEDB4 119862~|~1~|~1~|~01/S5K~|~All Work Included in this Split~|~66 - Resilience Improvement - Highway Project ~|~428ECD549649D9F40E6F1F40C1FEB52C1DBD6368 119235~|~1~|~1~|~01/S5K~|~Circleville urban area plan split~|~05 - 4R Maintenance - Resurfacing~|~37B8B952CF13D3D6717C7B6FCB60187725150105 119235~|~1~|~2~|~02/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~648AF74CE77EF9FECD0C2848284DBE9C7C3C3916 114685~|~1~|~1~|~01/S<2~|~Resurfacing Smoothseal.~|~05 - 4R Maintenance - Resurfacing~|~290EE743E1A3F06FEFA125548CF6FCB9466013C9 108812~|~1~|~1~|~01/IMS~|~Emergency repairs to linked structure > 20' span.~|~~|~29606D9A27555D1E881F7B5A7A65A808364F04D5 127050~|~1~|~1~|~01/ENH~|~Construction of new shared use path utilizing (80%) Safe Routes to School funds and (20%) Toll Revenue Credit up to Federal maximum.~|~28 - Facilities for Pedestrians & Bicycles~|~026A198F9118D5210F2CA3296BFE7BD32DE1A0C2 98792~|~1~|~4~|~04/NFA~|~Pavement repair project. Not on any federal aid system funded 100% state. Locations: MOE 26 17.06-29.45, 30.10-30.36, MOE 255 0.00-18.08, MOE 260 0.00-4.33, 5.52-11.32, MOE 379 0.00-4.57, 6.05-8.07, MOE 724 0.00-1.30, NOB 146 0.00-8.33, NOB 147 0.00-2.60, NOB 260 0.00-1.90, 3.75-14.35, NOB 340 0.00-0.71, NOB 513 0.00-9.38, NOB 564 0.00-13.48, NOB 566 1.59-4.80, NBO 724 0.00-2.75, NOB 761 0.00-1.90, and WAS 260 0.00-9.76, 9.98-11.00.~|~05 - 4R Maintenance - Resurfacing~|~051690D9E7C0DEAB3A1431D104929E3BA9F6A502 98792~|~1~|~3~|~03/STR~|~Pavement repair project. Rural other federal aid funded 80 federal/20 state. Locations: MOE 26 0.00-17.06, 29.45-30.10, MOE 78 0.00-32.26, MOE 145 0.00-21.41, 22.06-25.80, MOE 260 4.33-5.52, MOE 379 4.57-6.05, MOE 536 2.44-12.58, MOE 537 0.00-4.98, MOE 556 0.00-13.24, MOE 565 0.00-4.10, MOE 800 0.00-15.46, 17.92-26.04, NOB 78 0.00-5.61, 7.36-7.91, 9.63-21.35, NOB 83 0.00-6.77, NOB 145 0.00-12.39, NOB 146 8.33-18.59, NOB 147 3.50-21.04, NOB 215 0.00-4.61, NOB 285 0.30-5.31, 5.36-14.47, NOB 313 0.00-6.21, NOB 339 0.00-9.12, NOB 340 0.71-7.01, NOB 513 9.46-12.45, NOB 565 0.00-2.88, NOB 566 0.00-1.59, NOB 574 0.00-3.68, NOB 821 0.00-8.00, 12.78-21.36, WAS 26 24.74-29.36, WAS 145 0.00-3.25, and WAS 821 1.56-20.77.~|~05 - 4R Maintenance - Resurfacing~|~77D2758A4C769316D964B09EE3793745554946AD 98792~|~1~|~2~|~02/S<2~|~Pavement repair project. Urban other federal aid funded 80 federal/20 state. Locations: MOE 536 0.64-2.44, NOB 78 5.61-7.36, 7.91-9.63, NOB 285 0.00-0.30, NOB 340 7.01-7.08, NOB 821 8.00-12.78, and WAS 821 0.00-1.56.~|~05 - 4R Maintenance - Resurfacing~|~8608DCAC937DC7DABBB0717F69BE9DC2FC94CF25 98792~|~1~|~1~|~01/NHS~|~Pavement repair project. NHS routes funded 80 federal/20 state. Locations include: MOE 7 0.00-28.55 and MOE 536 0.00-0.24.~|~05 - 4R Maintenance - Resurfacing~|~C3042F9153AB6F66372E2927FCB9CBA380A285E2 103164~|~1~|~1~|~01/IMS~|~Plan split for guardrail repair~|~99 - State Preventative Maintenance~|~E2E442F64AF82FA72B872F93E61F8B25DAE8C548 103164~|~1~|~2~|~02/IMS~|~Plan split for guardrail upgrading on the interstate~|~99 - State Preventative Maintenance~|~AC4B1D465D42983C7C3C91300F1D561B873DF47F 103164~|~1~|~3~|~03/STR~|~Split for guardrail upgrading on the Rural STP system.~|~99 - State Preventative Maintenance~|~80189E44DD10C0A769C2CBA438F43F51A15E684A 90980~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - High Risk Rural Roads (HRRR) Funding - No CAP - Kno-SR 229-00.43 to 00.47~|~21 - Safety~|~889C0114816F64BF52E921C41B7BC3B39C25060F 94058~|~1~|~1~|~01/NHS~|~Federal Emergency project Disaster Flood Event OH11-01 DSR JEF-004 excavate and bench material to mitigate a rockfall situation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~52DCE87F9D49AE9F337E56EECE38C755626D814F 116842~|~1~|~1~|~01/S>2~|~Resurface Wolf Creek St.~|~05 - 4R Maintenance - Resurfacing~|~BEC98DE8334397A1379EAD5157AB130AD80532F4 83672~|~1~|~1~|~01/NHS~|~District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No cap - all work to remove or repair structures, SFN's 8801029, 8801053, 8800030, 8800065 and 8800154.~|~10 - Bridge Replacement~|~3619D79D665013C5CB5C52162B1131B0B6190044 83672~|~1~|~2~|~02/NHS~|~District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No cap - all roadway work, not involving the structures, with the project.~|~17 - Construction Engineering~|~B63C23DF587D648A6B69D044ADE664F787BA9124 94519~|~1~|~1~|~01/NFA~|~Project will enhance railroad infrastructure within the last quarter-mile of the Central Railroad of Indiana (CIND) leading up to the Cincinnati Bulk Terminals (CBT) facility by building a run-around and storage track that will provide for the efficient switching, loading, and placement of rail cars for the benefit of CBT.~|~44 - Other~|~38B8620C299CD25E4D56FDDC6173D16DC58ECFF2 110647~|~1~|~1~|~01/NHS~|~Resurfacing of ATB US 20 from 13.00 to 14.69.~|~~|~D3EDE89D9C9A60BDA740759EDD3ED671E274C89E 110647~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~65C3825E59445D8334E63F87FF11F0217AEF53D5 98168~|~1~|~1~|~01/STR~|~Plan split for Signal work~|~44 - Other~|~DD4E78F84C839C5BA76FF705A9D6C97F09ACAA38 98852~|~1~|~1~|~01/S>2/BTID~|~Extension of Salzman Road from the current dead-end north of SR-63 to the existing western T-intersection of Yankee Road and Todhunter, approximately 2750 ft. The project will modify the existing intersection at Todhunter from its current T-configuration to a four-way intersection, and construct a new three lane segment south to Salzman Rd. Improvements include installation of curb and gutter, storm sewer system, and intersection lighting at Todhunter. The extension of Salzman will provide a direct route for truck traffic to access SR-63 and provide relief to Yankee Road between Todhunter and SR-63.~|~01 - New Construction~|~C22CA7504C05CC31B6B760FC5E4DC6C31EF0F411 98852~|~1~|~2~|~02/NFA~|~The TID is constructing the Salzman Rd extension including, but not limited to extending Salzman from its existing northern terminus to the north to connect to the intersection of Todhunter Rd at the southern terminus of Yankee Rd.~|~~|~EBC5E01F36E8A6AAF924D6F1C83609F2663E1AF1 98852~|~1~|~3~|~03/NFA~|~TID is constructing the Salzman Road Extension, including but not limited to extending Salzman from its existing northern terminus to the north to connect to the intersection of Todhunter Road at the southern terminus of Yankee Road~|~~|~8F7EA7AD172B0247D122B1B0CC0A2DE639DB5F31 98852~|~1~|~4~|~04/NFA~|~Realignment of Yankee Rd to Salzman Rd will allow trucks to take the shorter route south to SR 63 to access I-75 instead of traveling north to SR 122~|~~|~491C14C07FDB7C7ACC727A3A852D5931F62EDA6A 121262~|~1~|~1~|~01/NHS~|~Resurfacing SR 36~|~05 - 4R Maintenance - Resurfacing~|~51ABB5DD9EB4ECB58D7EFE5A2B627A5FDE331A23 120066~|~1~|~1~|~01/NFA~|~NEVI Round 2 275-A~|~~|~7C09F3F8595660BB4DE489DA6F3F4BC8F209F2B5 102031~|~1~|~3~|~03/NHS~|~This plan split is in the NHS route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4733286AE00C2BA78D583C70ED26C02F5E749BBC 102031~|~1~|~2~|~02/S<2~|~This plan split if for small urban culvert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A6A93566FF3C067F7749538728FEAC7CEF449DEE 102031~|~1~|~1~|~01/STR~|~This plan split is for STP Rural~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F163969AB321E7B18D6E6A1E987856BEE22BF6D 102069~|~1~|~1~|~01/BRF~|~Markell Road bridge replacement work~|~10 - Bridge Replacement~|~AEBEA0B020CD3746740CCFB0B3F10EE9AD86B83D 102069~|~1~|~2~|~02/BRF~|~Markell Road bridge replacement work~|~17 - Construction Engineering~|~4F07E2332ECF916812CB63BE2A3B61B475B15D55 95753~|~1~|~1~|~01/STR~|~LUC-20A from SLM 0.00 to SLM 2.23~|~~|~51B1E4FD95FEFFC9915E635D98A6CD236DC5D4BE 106351~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair project. DSR MOE-003, MOE CR 81 2.87. Funded 100% federal ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~339750D302CD78C460F5D17EBEE93E637AB0C4DC 84556~|~1~|~1~|~01/SAF~|~Intersection Improvement~|~21 - Safety~|~35F5ECE590FAA4E231BA153C4D3741F1898A5D32 84556~|~1~|~3~|~03/SAF/CITY~|~Water line work, related MOT and associated pavement repairs for the City of Sandusky.~|~21 - Safety~|~8802CB77D106CE275AC57EF8120935F8AFB5A9C0 84556~|~1~|~2~|~02/SAF/ERIE~|~Valve Box/manhole/ect. adjustments that are the responsibility of Erie County. Erie County Waterline Relocation.~|~21 - Safety~|~D2F51E4C7DFF26E9A400A5E18FC34FE18CE245E0 110484~|~1~|~1~|~01/SAE~|~Project to upgrade the signal by installing mast arms, backplates, and battery back up.~|~21 - Safety~|~3B28240267F0D56820E3163B2C863089EB53E371 110484~|~1~|~2~|~02/SAF~|~To pay for pull boxes which the City of Dayton has requested in lieu of conduits~|~21 - Safety~|~77A1E32A715892DE9F3F108CE437145869FFD0A8 100441~|~1~|~1~|~01/NHS~|~Deck Sealing7300964 SCI 52 17130 L 7300999 SCI 52 17130 R 7301022 SCI 52 17200 E 7301057 SCI 52 17200 L 7301081 SCI 52 17200 R 7301111 SCI 52 17200 F 7301170 SCI 52 17850 D 7301200 SCI 52 17850 L 7301235 SCI 52 17850 R 7301294 SCI 52 18100 L 7301774 SCI 52 28000 N 7301839 SCI 52 29300 L 7301863 SCI 52 29300 R ~|~13 - Bridge Rehabilitation~|~2A1CE7DCDBCF333EBD076A797E3281331DEE10D0 79315~|~1~|~2~|~02/S>2~|~Federal/state funding for general system paving:FRA-317: 0.70-2.13, 2.69-3.03, 3.36-5.4302/S>2/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~14CB7D6DB518D371C230AD438AF588189F5E2661 79315~|~1~|~1~|~01/S>2~|~Federal/local urban paving in Columbus for:FRA-317: 0.34-0.70, 2.13-2.69, 3.03-3.3601/S>2/PV/F_LC~|~05 - 4R Maintenance - Resurfacing~|~3D257512DFF53BFB971F4A0D0CC6A90AB91E299B 85216~|~1~|~2~|~02/STR~|~Work on 2 culverts: 285281632 and 285281637~|~44 - Other~|~9DBC87E73B02522C1FB8613D74DF322BFD9C5FA8 95376~|~1~|~1~|~01/BRF/PCE~|~Replacement of High Street Bridge, sfn#6733972 over the Cuyahoga River, Portage County, Ohio.~|~10 - Bridge Replacement~|~E2AE49C09BCE9E44D33F4CD5EB5CB768F0C6CADC 120792~|~1~|~1~|~01/NHS~|~Safety items~|~21 - Safety~|~90DA05AA3D263998C6A72DEB7CCC2FABE6CED010 110978~|~1~|~1~|~01/NFP~|~CE plan split~|~17 - Construction Engineering~|~416E6A1A0695FE47B00F9C2563DB721F97499DC3 99607~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7B90EFD4DE1E75DEB3C90C2C7C1C4B9620AFAD62 124542~|~1~|~1~|~01/NHS~|~Roadway reconstruction.~|~04 - Reconstruction - No Added Capacity~|~7367B70632651878BF36980D9F1B2AF3639B5C53 124542~|~1~|~2~|~02/BRO~|~Bridge Rehabilitation. ~|~13 - Bridge Rehabilitation~|~98309F139774BA16DBE562B74DA2F7C137405017 124542~|~1~|~3~|~03/NHS~|~Noisewall installation~|~~|~FD8ABD8B0EAF9CC2E5586C34C61D375F77FD44D2 108712~|~1~|~1~|~01/NFA~|~Bridge Replacement~|~17 - Construction Engineering~|~E75E7DB4B65603D28A7ED801AB5A3AD7850D3070 116577~|~1~|~1~|~01/SAF~|~Convert all-way stop-controlled intersection into single-lane roundabout at MED-162-20.06/River Styx Rd (CMAQ/TSMO)~|~~|~C58283459212736939A16FF1A815279B81D7AD8C 116577~|~1~|~2~|~02/SAF~|~Medina County Sanitary Engineer for water main relocation on ODOT ~|~~|~9959C9BF33A4FA1B2840586EDB384688F8E3427B 126069~|~1~|~1~|~01/NHS~|~Plan split for CPR on US-24~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2010505345120D16CB57750108803C845B4E8FC3 98733~|~1~|~1~|~01/NFP~|~Plan split for federal funds used for safety signs on US BR 50~|~21 - Safety~|~A39BF63BA5FF5A7C802118AA8B009693BE564B05 119159~|~1~|~1~|~01/IMS~|~All work included in this split.~|~05 - 4R Maintenance - Resurfacing~|~71C02B5A81D24B77BF44B4FCEB5F78AC693F887E 105851~|~1~|~1~|~01/IMS~|~Demo buildings related to the BSB project.~|~44 - Other~|~5F6F6058D8833B5617A5B95667042D26ABA6CB66 114908~|~1~|~1~|~01/STR~|~Spot Repairs on PIC-762 0.00-6.32~|~05 - 4R Maintenance - Resurfacing~|~2CBE44C77BBCD8716B0824FE65C9EAF192B4BD55 98565~|~1~|~2~|~02/STR~|~Plan split for Rural section of CLE-749: SLM 0-2.38~|~05 - 4R Maintenance - Resurfacing~|~EBC00DA548FC1D719B96A36E73C51AE1D6A2D18F 98565~|~1~|~3~|~03/S>2~|~Plan split for Large Urban section of CLE-749: SLM 2.38-5.51~|~05 - 4R Maintenance - Resurfacing~|~F581323B02CE2EAB3436499ECB524C03EB683E48 98565~|~1~|~1~|~01/NFA~|~Plan split for the Non Fed Aid section of CLE-743: SLM 0-0.07SLM 0.45-3.65~|~05 - 4R Maintenance - Resurfacing~|~990AFBF9B44A393C9FFFFDDAE42FD4D7A03A3147 121908~|~1~|~1~|~01/ERD~|~Improvements to the intersection of SR 741 and Lytle Five Points in Springboro. Addition of turn lanes and pedestrian crossing improvements.~|~21 - Safety~|~D2EAAFCA11DB11E21600BB03D127931276B7F1D7 97768~|~1~|~1~|~01/IMS~|~SFN 5704925, MOT-70-0452, C11 (Brookville Phillipsburg Pike) 1. Remove exisiting LMC overlay and replace with SDC concrete using hydrodemolition. 2. Replace expansion joint seals. 3. Use SCC mix to patch railing, abutments, piers, backwalls and wingwalls. 4. Seal concrete surfaces. SFN 5704952, MOT-70-0553, T-23 (Wellbaum Road) 1. Remove existing LMC overlay and place SDC overlay using hydrodemolition. 2. Use SCC mix to patch backwalls. 3. Clean and seal expansion joints. 4. Seal concrete surfaces. SFN 5705045, MOT-70-0662 C17 (Diamond Mill Road) 1. Overlay existing deck with latex modified concrete using hydrodemolition. 2. Fix railing and bridge fence. 3. Patch abutments using SCC patching material. 4. Seal concrete surfaces.~|~13 - Bridge Rehabilitation~|~C6894EF527A3C6FD73A568FFCDEE9B432F7285F3 97768~|~1~|~2~|~02/NHS~|~Work to include NHS Bridge # MOT-49-1065 L SFN 5704448~|~13 - Bridge Rehabilitation~|~51FE71AE05E4A0D1E7164E512DC6853B92D1C880 98485~|~1~|~1~|~01/NHS~|~MED-224-0.00-6.41 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~86AB563012B2E4A43BA29019E10FC6FE2026B91E 113894~|~1~|~1~|~01/NFA~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~92432E3955F259CF802B69F0F6B950DE073E51BF 87344~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal)/ 4SS7(20% State) - CAP of $1,298,333.00 - Located FAI SR158 3.75-3.88 with treatment including cutting back rock face; improved rockfall containment; pavement repairs and resurfacing as required~|~04 - Reconstruction - No Added Capacity~|~78645CC5795CE73141BD57BAC3EE708AFFE5CDDD 108377~|~1~|~1~|~01/NHS~|~Mill and fill in the City of Bellefontaine.~|~05 - 4R Maintenance - Resurfacing~|~60DFA041C36C5AAAA831202A18A8423234303CF0 108377~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~9B67FBEA4135648832E0E8AD60E403B66450BCC6 93602~|~1~|~1~|~01/IMS~|~I-75 SB rest area~|~44 - Other~|~BE96EA59CB88AA9013C44880EA01C1D86CD8A393 119925~|~1~|~1~|~01/IMS~|~Restriping along IMS routes in D05~|~21 - Safety~|~6BBBE115BEFE3E0B1739299B8A06F05EF14B48C0 111373~|~1~|~1~|~01/NFA~|~Widening of Columbia Road.~|~03 - Reconstruction - Added Capacity~|~4B785C472519A148F4C8434635CE45650B2399D1 104680~|~1~|~1~|~01/NFP~|~ADA CR VAR GR~|~21 - Safety~|~93492003E2225EBB73CEC7229976C45959FAB581 96890~|~1~|~1~|~01/NHS~|~Installation of Median Cable Barrier along SR-5 and SR-82 in Trumbull County, Ohio.~|~21 - Safety~|~DA241100921EBC42BEAA555E366DB2D6F28B0CD9 118776~|~1~|~1~|~01/NHS~|~added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~68CDB89D84B74422A5E7EFCDAB252FC0BB1EB52D 89448~|~1~|~1~|~01/STR~|~District Pavement Marking project.~|~44 - Other~|~2757522C9406225986787A64E0437BAF4E2C18BA 96856~|~1~|~1~|~01/SAE~|~Install new and upgrade existing guardrail on various county roads.~|~~|~49DEC3AEE6EC7409B46F3B130516E05A0376BF71 101142~|~1~|~1~|~01/IMS~|~Overlay I-75 in Miami County with asphalt concrete: MIA IR 75 SLM 0.00 to 4.92~|~05 - 4R Maintenance - Resurfacing~|~3161A9CD79DBF9D1E9501241EEA0B3482A717360 110003~|~1~|~1~|~01/NHS~|~LOOPs~|~44 - Other~|~7F5D183EB25E5BA321F723EE1A68830FF09B2461 103868~|~1~|~1~|~01/NFA~|~The PORT will construct a full depth reclamation of approximately one mile of Guernsey Street which is a two lane road, in the Village of Bellaire.~|~01 - New Construction~|~CEE7FDAC95FA46D994FE53AB4B1D8CDAEDDA0BEF 122490~|~1~|~1~|~01/NFA~|~Resurfacing project on NOB CR 19 0.00-2.207. Funded through the Local Roads Oil and Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~25126F0FB9D99A93AF6519D4FCA979DA77729458 123479~|~1~|~1~|~01/NHS~|~Federally eligible items.~|~01 - New Construction~|~1A5647B1E38DCB049E63E9EF05B31B5D9EE5F4F7 114584~|~1~|~1~|~01/NFA~|~Landslide repair project. MRG 555 15.60. Work includes drilled shaft wall.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C7E0FA6051DAA5B69811C3134A650E2B4913976D 100261~|~1~|~1~|~01/MPO~|~Resurface North State Street using MPO STP funding including work to incorporate share bicycle lanes in both directions.~|~05 - 4R Maintenance - Resurfacing~|~6E4F0930BC28F5FB4F2B91DA018403B4675FD810 115029~|~1~|~1~|~01/STR~|~ASD SR 0060 14.97-Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~891841FE700BAA863C1AEA918B611C0EFDDEA611 109450~|~1~|~1~|~01/IMS~|~Minor bridge work.~|~~|~3206767169377744F05DFD2C1610593D79D08A18 109450~|~1~|~2~|~02/NHS~|~Bridge rehab.~|~~|~8C52829EE6B4EDC9C6E73E8AB3CAE91EB861BE8E 109450~|~1~|~3~|~03/S>2~|~Minor bridge work.~|~~|~FC9A6F8B917CF0CD1045ED9B032BBB0970A99903 90771~|~1~|~1~|~01/SAF~|~Sidewalks, curb cuts, ADA curb ramps, upgrade of traffic signal control equipment, and ditch enclosure work at Meijer Drive on State Route 741 from SLM 5.80 Orchard Run Road to Moraine's South Corporation Limit SLM 6.20.~|~21 - Safety~|~A9E53F53BC9C43702C90CDF6DBDE216EDE151C2F 90771~|~1~|~2~|~02/S>2~|~Resurfacing and other roadway related items~|~21 - Safety~|~C725806981E69969E2D73A6E32ECB4F9619C1765 105909~|~1~|~1~|~01/IMS~|~Plan split for interstate bridge work~|~13 - Bridge Rehabilitation~|~FD11F535463D70818B74753E095F0A224FB0109B 96484~|~1~|~1~|~01/IMS~|~new interchanges~|~~|~F80F9CB23446C3B122F6784CEB6F2E332AC788F4 96484~|~1~|~2~|~02/NFA~|~The TID is constructing the I-475 @ US20A Project including, but not limited to , roadwork improvements by constructing a new interchange at US 20A and I-475~|~01 - New Construction~|~AE3F581EFEB667179388874E6A40E4BC7370E78E 119776~|~1~|~1~|~01/SAF~|~Widen Trenton Franklin Rd (CR-81), install rumble stripes, and remove fixed objects within the clear zone.~|~21 - Safety~|~0E76815E7D07EE340E5F09E29AEEF8527B388D91 85146~|~1~|~1~|~01/BRO~|~Split for all work on this structure using system preservation funds.~|~10 - Bridge Replacement~|~9829F3A16F0C9A56E049EF58CC4B915C5C57BC38 123412~|~1~|~1~|~01/STR~|~Resurfacing SR 800~|~05 - 4R Maintenance - Resurfacing~|~6ACEB2A59786D5E25B0B986B1F8B3A850D7F300B 124016~|~1~|~1~|~01/NHS~|~Double Application Microsurfacing on LOR-18-0.00 to 5.721~|~05 - 4R Maintenance - Resurfacing~|~47B0944021CDAFD08111B3EC79E4B2EAAF0085F8 124016~|~1~|~2~|~02/STR~|~Single Application Microsurfacing on MED-301-8.189 to 10.191~|~05 - 4R Maintenance - Resurfacing~|~13A6049EC607566BC914FA3C5A750C75BFF3496E 96730~|~1~|~1~|~01/STR~|~STP Rural Micro: LOR-58-8.42 to 13.89~|~05 - 4R Maintenance - Resurfacing~|~69F899B44EF74B5A0D03CFCDFE295B8DF4D97E64 96730~|~1~|~2~|~02/NHS~|~NHS Micro: ASD-224-0.00 to 6.56~|~05 - 4R Maintenance - Resurfacing~|~9FF554C1B3B38D252C50E3BFF0CFCD6BC5E2ED48 122976~|~1~|~1~|~01/SAF/Ont~|~Convert two-way stop-controlled intersection into a single-lane roundabout.~|~21 - Safety~|~41B641BE5DA59AB50C217AC599A89410898743B9 99585~|~1~|~1~|~01/NHS~|~Split for all resurfacing work funded with 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~BA51285B9958B3B70E913E91FE7362BFB9EDED4D 94465~|~1~|~1~|~01/STR~|~Preventive Maintenance SmoothSeal~|~05 - 4R Maintenance - Resurfacing~|~90B763B763B760061604E1023CBCC9F210E522F9 98528~|~1~|~2~|~02/SAF~|~Systematic Sign Replacement LOR-57-12.50 ? 12.86.~|~21 - Safety~|~BD90FD4DAB3309DC4D6F14125DC825491AE40CED 98528~|~1~|~1~|~01/NFP~|~Systematic Sign Replacement~|~44 - Other~|~4E52E7A9979D4E71CB571FB0D9B7B5B990BB7004 115789~|~1~|~1~|~01/NFA~|~Created for J&C inivolvement~|~44 - Other~|~A64A589BF8F995F93A1447AE968337716F517B33 113076~|~1~|~1~|~01/NHS~|~Fine Poly AC Overlay~|~05 - 4R Maintenance - Resurfacing~|~B075016D5A42A449A7B674C582A9AEEAFC081CBD 96597~|~1~|~1~|~01/BRO~|~Replace existing slab superstructure on bridge COL-164-2444 (SFN 1505165) with new slab superstructure. Replace pier caps.~|~13 - Bridge Rehabilitation~|~05C7B18B6D6F83F9EDCE625F0E14ADD8EBCFD0F4 110604~|~1~|~1~|~01/NFP~|~Plan split for mowing work~|~99 - State Preventative Maintenance~|~F7992129061485B800597BB53F936226B26C654F 123236~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1B6886C1D11268E2567CD2C9ADAB295B485EE3F0 105551~|~1~|~1~|~01/NHS~|~FAY-62-14.61 to 15.49~|~05 - 4R Maintenance - Resurfacing~|~3CBCF31C468B4E4E4009AC93575679269FECAA37 105551~|~1~|~2~|~02/S<2~|~FAY-62-11.88 to 12.03~|~05 - 4R Maintenance - Resurfacing~|~3AA8D353432D710A03FA49558559714D86331324 105551~|~1~|~3~|~03/STR~|~FAY-62-15.49 to 26.74~|~05 - 4R Maintenance - Resurfacing~|~7EEC7711061CC46ADC66E33C9E5C58F0BCB27041 98927~|~1~|~1~|~01/NHS~|~Culvert Repair: HUR-20-15.02 (CFN 390200078), WAY-21-00.10 (CFN 1803931)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D062B957A27BBDCAFCE44E873390BE7890AAF229 99925~|~1~|~1~|~01/SAE~|~100% CEAO funding for guardrail on county roads~|~21 - Safety~|~D4856E73BE301211E571D80E1B349DA3B202F9B6 95852~|~1~|~1~|~01/NFA~|~Resurfacing of Bishop Road (TR-132) from Old State Route 534 to LaFever Road, in Harpersfield Township, Ashtabula County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~1FFD9CCEC51E7B9C69830CE166C87C73683AC75F 109038~|~1~|~1~|~01/ENH~|~Sidewalk project~|~28 - Facilities for Pedestrians & Bicycles~|~8C27D99A9E1DD7B69F92C68CCEAA376D90994A7A 109038~|~1~|~2~|~02/ENH~|~Sidewalk Project~|~17 - Construction Engineering~|~AFA28389D5958AE8BA69719D3DD75F0989FCFB78 102019~|~1~|~1~|~01/NHS~|~Geological Site Management Funding - 4SF7 (80% Federal)/4SS7 (20% State) - Rock Scaling at FAI-37-14.24.~|~21 - Safety~|~E158FB6B55A2ED222F81FC9D583B12E6A61C60D2 125987~|~1~|~1~|~01/NFP~|~Annual highway lighting maintenance contract~|~21 - Safety~|~9C1B6D5B2D1223CF76915C56AB222CCFE31F1577 96513~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~6560DD8C302E6C38F1EF40690FDEDA763FF620C1 96513~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~4E7B56090FF69955EAC2238A1594ED2B40716275 98474~|~1~|~1~|~01/STR~|~Funds from the District Preservation Program budget. Rural STP.~|~05 - 4R Maintenance - Resurfacing~|~4D2613FA21F975177879E6584F3C736176343127 98474~|~1~|~2~|~02/NHS~|~For work outside the City of Lima but inside the Lima Urbanized Area on the NHS. Funds from the District Preservation Program Budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~4E83F502769074F49A565A4B35750A0797EAAD0C 119854~|~1~|~1~|~01/S>2~|~Pedestrian improvements along SR 161~|~28 - Facilities for Pedestrians & Bicycles~|~D5114180CCEE04C036231BBE97F3E96577E9790B 93064~|~1~|~1~|~01/NFP~|~Facilities project~|~44 - Other~|~714FA7AB3433AFE785E37359CE02B3600A67D696 122741~|~1~|~1~|~01/S>2~|~Plan split for MPO STBG funded scope~|~05 - 4R Maintenance - Resurfacing~|~8B528E5FEFAC96F37EDF9FD08FE4BE48EAE932A0 122741~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded scope, such as water line replacement.~|~17 - Construction Engineering~|~E5C47721C5802044F2482A2AFD8CF6E99F60D5EC 107071~|~1~|~1~|~01/NFA~|~Various CR guardrail in Adams County.~|~21 - Safety~|~17F065D3F83FAE00759EF731CD1CF46F63150B8C 93754~|~1~|~1~|~01/IMS~|~01/IMS/BR/ ; ALL/HAN-75-22.68/0.01; 90% Fed (4PF7) - 10% State (4PS7) - No Cap~|~13 - Bridge Rehabilitation~|~EA321A60776AC94B541F3CCC16F2CFA155BF2794 112800~|~1~|~2~|~02/NHS/GROV~|~Urban Paving within Grove City~|~05 - 4R Maintenance - Resurfacing~|~A91E6A498C4A0D99CFC815376E7B28EC1F0F6B63 112800~|~1~|~1~|~01/NHS~|~NHS Plan Split on SR 665.~|~05 - 4R Maintenance - Resurfacing~|~3D93CA419807669C295E4998FE98872FB53CFC1B 112800~|~1~|~3~|~03/S>2~|~Plan split for concrete pavement repairs only, in Grove City.~|~05 - 4R Maintenance - Resurfacing~|~15933FD00973382FED1ADB2506518FE9E294E01D 112800~|~1~|~4~|~04/S>2~|~Plan split for concrete pavement repairs only, outside Grove City.~|~05 - 4R Maintenance - Resurfacing~|~22FD4BFB566D6B17115A11EABF20471BD69881DC 88947~|~1~|~1~|~01/STR~|~SR193 0.64 SFN 0405078 over pymatuning creekSR193 13.61 SFN 0405493 over mill creek~|~10 - Bridge Replacement~|~65BF3709C295B47443B296B332535EBC986B0395 102043~|~1~|~1~|~01/NHS~|~Rockfall remediation on LAW 7 0.66 & LAW 52 12.32~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CB59187250E0E79167198D781667578E25051C6B 87838~|~1~|~1~|~01/STR~|~LAW CR12/CR18 Guardrail ProjectIt is proposed to install new guardrail along 4.3 miles of CR 12 and 3.1 miles of CR 18 in FY15. 100% safety furnds from CEAO01/STR/OT/Law~|~21 - Safety~|~D45F98C79D2F58DCBA8E977268F807FAFDC74885 119592~|~1~|~1~|~01/ERD/BLUE~|~Construction of a new roadway connecting Reed Hartman Highway and Grooms Road.~|~01 - New Construction~|~21522614C888F12CAFD15FD3CAD80B352632478C 119896~|~1~|~1~|~01/STR~|~Plan split for slide repair~|~66 - Resilience Improvement - Highway Project ~|~99F982E88045FB63ABB237B2EDE124956117857F 103261~|~1~|~1~|~01/SAF~|~District Wide fast drying pavement markers.~|~21 - Safety~|~92CBC362732A2DBC1D2F8398035598A643EAE5E7 101012~|~1~|~2~|~02/IMS~|~Bridge rehabilitation treatments~|~13 - Bridge Rehabilitation~|~B7D561F680C34BD92AD3E52271C96EBA7DD66FFA 101012~|~1~|~1~|~01/IMS~|~Resurfacing and related roadway work.~|~05 - 4R Maintenance - Resurfacing~|~F2CF11CEC10EFBB651DD85B774D1A54374BA2708 124993~|~1~|~1~|~01/S5K~|~Bridge Replacement~|~10 - Bridge Replacement~|~6114A579E700DCC28B4E7AF545C4316B20DA9740 111570~|~1~|~2~|~02/NHS~|~NHS ~|~05 - 4R Maintenance - Resurfacing~|~175F07C8C61CC9E648BFABF0EACB2FAE6FD61608 111570~|~1~|~1~|~01/S>2~|~2 1/2" mill and fill with superpave asphalt on:MOT-835 SLM 1.64 to 2.73in the City of Kettering.~|~05 - 4R Maintenance - Resurfacing~|~786C846C198E03AD902999C5860AD5B2F069D098 105235~|~1~|~1~|~01/NFP~|~Resurfacing of STA US 30 from 25.84 to 31.96 and STA SR 619 from 14.74 to 16.44.~|~05 - 4R Maintenance - Resurfacing~|~76ED72779C8CD7C4E8746E07C6A6FC81BB2EFE03 105235~|~1~|~2~|~02/NFP~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~0618333B2E09C96EF53B9FAEC411F6D9A7CEAC09 105235~|~1~|~3~|~03/NFP~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~3C60D4D9AC1DA6B159FC0A5A1C3AE34BCF02B4DF 105235~|~2~|~4~|~04/NFP~|~Culvert work.~|~04 - Reconstruction - No Added Capacity~|~6C20B618BAEDBA04FF072E3D7B9BD60687B6620E 105235~|~1~|~5~|~05/SAE~|~Adding rumble stripes.~|~21 - Safety~|~7990933716F2836CB870EAC711302E7589DA78D5 104688~|~1~|~1~|~01/S<2~|~SCI CR 2 0.00-1.06 widening.~|~21 - Safety~|~59DA2D166AB553259F590A35B799D6E62E90AB86 93378~|~1~|~1~|~01/BRF~|~Rehabilitation of three span prestressed concrete box beam bridge over Wolf Creek. Project consists of replacing the piers and superstructure. Abutments will be evaluated. Minor approach work and channel protection along with possible replacement of retaining wall on approach on SFN 5765366 MOT M0125 3.47 Broadway Street Bridge.~|~10 - Bridge Replacement~|~FBACE45E4D62F4C137F30DA3A8D80C87F3D61D0B 95479~|~1~|~1~|~01/NFP~|~Plan split for 100% state funded culvert work District Preservation Program Funds SAC 4PS7.~|~44 - Other~|~FDC4A8A2A0D2634A2BC396CCD7D8138B8A12471D 111272~|~1~|~1~|~01/NFA~|~ODNR Shawnee State Forest.~|~05 - 4R Maintenance - Resurfacing~|~EB2BB647FDAB7351E232C6D8A1A3DD02858F9A25 107408~|~1~|~1~|~01/IMS~|~Plan split for resurfacing work~|~04 - Reconstruction - No Added Capacity~|~B068063B04280CF05EF19E879B37E18DE0BB2B65 107408~|~2~|~2~|~02/IMS~|~Plan split for bridge repair work.~|~13 - Bridge Rehabilitation~|~3AEF72919169BDDA75338365122E103D3B2DA004 13108~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation of 1) 4201388 KNO US36 15.9 Intersect: Brannican Run; Not BR Eligible for Rehabilitation: Length=12 SD/FO(0) SR=79.4 DSR=" "; 2) 4201418 KNO US36 16.42 Intersect: Trib Of Kokosing River; Not BR Eligible for Rehabilitation: Length=12 SD/FO(1) SR=46.9 DSR=" ";~|~10 - Bridge Replacement~|~0D9C6BB9201FE5566597476AB555C5C8FC593D31 105339~|~1~|~1~|~01/STR~|~Microsurface on rural routes: MIA SR 41 SLM 0.00 to 5.68 & MIA SR 48 SLM 16.88 to 19.40.~|~05 - 4R Maintenance - Resurfacing~|~BEEE66E505197EFBAAEAA9E560F1AB6677472D33 77158~|~1~|~2~|~02/NFA~|~Complete Phase 2 of Farm rd. connector by extending farm Rd. from GKN, Sinter Drive and ending at SR 7, via parts of Second St. 100% Local.~|~17 - Construction Engineering~|~1BF2F133D55488CD571B8E11DA724CBD01CBF300 77158~|~1~|~1~|~01/ENH~|~Complete Phase 2 of Farm rd. connector by extending Farm Rd. This split includes construction of bike path. Federal/Local 80/20% Enhancement funds.~|~~|~DC5CD2090B2DED8B3B0A60107C7FE8E3A44FE8A1 111293~|~1~|~1~|~01/SAF~|~"01/SAF/OT/COSH" - 90% Federal (4hj7) and 10% State (4BG7) - upgrade of signal equipment within city of Coshocton.~|~~|~6C7EEBB5510F25A509ECA710FAF8E0602F440533 105490~|~1~|~1~|~01/IMS~|~Bridge deck edge repair and railing replacement on IR 77 over SR 209, Pier patching on CR 43 over IR 77.~|~13 - Bridge Rehabilitation~|~B1C1F8F54F827DFCEB8B9D1FC5BBAD4B83359DCF 92556~|~1~|~1~|~01/SAF/MHY~|~Widen US127 to provide a northbound left turn lane into Kemper Lane in Mt. Healthy. This plan split also includes the water works include work paid as contract cost.~|~21 - Safety~|~EFC621FE4A48CEB28272FE102531672D5F3B7E7F 92556~|~1~|~2~|~02/S<2~|~Change order work to be paid by the Cincinnati Water Works.~|~21 - Safety~|~A9E2F829D25CE80FE29368FF52F7D54438E098D6 107994~|~1~|~1~|~01/NFP~|~Resurface parkways eligible for State Metroparks funds~|~05 - 4R Maintenance - Resurfacing~|~5727DD7C471395E595C70A2BFF3FBDC5BFFFD9AD 100382~|~1~|~1~|~01/STR~|~Uses District Capital preservation allocations to resurface SR231 from SLM3.04 to 10.34.~|~05 - 4R Maintenance - Resurfacing~|~3DEB9F35C15FBFE00A6162F653CD66E323F5F127 98265~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - plan split 01 for Gue-70-1654L/R~|~13 - Bridge Rehabilitation~|~C36132DEF03F6D06FA7DED2980459C479A5C899C 100830~|~1~|~1~|~01/STR~|~Rehab Bridge PRE SR 122 24.36 by painting the pier piling with OZEU apecifications. Temporary work below the Ordinary High Water Mark (OHWM) will be necessary.~|~13 - Bridge Rehabilitation~|~8C7896E97EC49A86DD18306B9DB08C73E833BCA6 117783~|~1~|~1~|~01/BRO~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~42C29344B41B356D278896F44C97071AEC271A3F 118975~|~1~|~1~|~01/SAF~|~Plan split for pavement markers and RPMs.~|~21 - Safety~|~F116CECDDE82AF6101EA1252FEFA09AAFDB442E0 113940~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment. MEG 33 22.13-29.10. Major 2 funds.~|~05 - 4R Maintenance - Resurfacing~|~C1953287DE97603BED2C7AD143552679CEE7CC20 110603~|~1~|~1~|~01/NHS~|~All items of work associated with the resurfacing of US 23. The work includes pavement repairs, guardrail work, drainage work and other miscellaneous items of work.~|~05 - 4R Maintenance - Resurfacing~|~3DA433D7A241180170C66D19C6BFCB122BCA6435 85400~|~1~|~2~|~02/NHS~|~100% local participation items of work such as curb ramps, etc.~|~05 - 4R Maintenance - Resurfacing~|~14D56F9C59AD0F2AB9AEFC15747128C3277258FF 85400~|~1~|~1~|~01/NHS~|~Split for all Urban Paving eligible work.~|~05 - 4R Maintenance - Resurfacing~|~64628C6CF69D723442D2096E93FC921FA328933F 102103~|~1~|~1~|~01/ERD~|~Widening of MAH/TRU SR-46.~|~04 - Reconstruction - No Added Capacity~|~B8A2FA2C05EFEAC8C0B338389A44DD9EDD1DB4A8 115689~|~1~|~1~|~01/NHS~|~NHS paving split~|~05 - 4R Maintenance - Resurfacing~|~D28D218C6CEAFC43A47529C547994406EE7A1842 100294~|~1~|~2~|~02/S<2~|~Single and Double Microsurfacing to ATB SR 45 23.00 to 24.08, ATB SR 531 1.98 to 6.86.~|~05 - 4R Maintenance - Resurfacing~|~B09B40E66A5260E64938E03108184AC522001DDD 100294~|~1~|~1~|~01/STR~|~Single and Double Microsurfacing to ATB SR 45 14.61 to 19.75 and 22.28 to 23.00.~|~05 - 4R Maintenance - Resurfacing~|~BC9F82BA757452A13260E376DFE810A030B6201F 122510~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes~|~21 - Safety~|~778E30008F8696CDE083783A8A7875A614E005B6 97269~|~1~|~1~|~01/NFP~|~Trumbull County MetroPark District parking lot at North Road Nature Preserve~|~44 - Other~|~E20632D816A606EC45B0D2656075896D1CBFA31A 125384~|~1~|~1~|~01/NFA~|~Resurfacing and related work on SR 206 in Coshocton and Holmes Counties.~|~05 - 4R Maintenance - Resurfacing~|~38874E8C926836F2238C3829A4A6DDA2A71E8D66 99814~|~1~|~1~|~01/ENH~|~Installation of two Rectangular Rapid Flashing Beacons (RRFB) at the crosswalk near Wooster Pike and Belmont Avenue. Construction of a raised median to provide pedestrian refuge. Replacement of sidewalk on the south side of Wooster Pike between Belmont and Harvard Acres.~|~28 - Facilities for Pedestrians & Bicycles~|~B537FE083F1925D7CE97A8F1E5DE06EA0C931188 118781~|~1~|~1~|~01/STR~|~added split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F2C44FA662DD991DBB0CEAD89DB0D16794C0FBB7 116433~|~1~|~1~|~01/SAF~|~Signal, concrete walks, and pavement markings~|~21 - Safety~|~E5AE01125AFA2D6C3DDA254E8B978612EF089962 118149~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F841A9C68C0A2836466EF16A7E6722F5712C4FB2 93498~|~1~|~1~|~01/BRO~|~80% County LBR w/20% Local matching funds for a BR eligible structure replacement of SFN 4342542.~|~10 - Bridge Replacement~|~29293A32CC386C9BE3DA2BA3171ACECDB675801E 80138~|~1~|~1~|~01/NHS~|~Paint structural steel on bridge that carries SR 7 over Alexander Street.~|~47 - Bridge Preventive Maintenance~|~0564E726294E259500797476A62D1392BCC5C005 95718~|~1~|~1~|~01/NHS~|~SAN-20 from SLM 2.73 to SLM 15.29~|~05 - 4R Maintenance - Resurfacing~|~9EFD525EA69F48307ED6E16C680803376DA341B0 95718~|~1~|~2~|~02/NHS~|~Bridge on SAN-20 @ 3.18~|~13 - Bridge Rehabilitation~|~66FF2723539F500CB21CA41A78C5690DC3AA1A2C 95718~|~1~|~3~|~03/NFP~|~Plan split for 100% locally funded items requested by the Village~|~05 - 4R Maintenance - Resurfacing~|~D6D086BC3360BAF3419099105736A3B2E51CCF34 112413~|~1~|~1~|~01/IMS~|~plan Split to resurface WAR-71~|~05 - 4R Maintenance - Resurfacing~|~0B9E4160324729040EE12900C5F09D3C91D41B65 112413~|~1~|~2~|~02/SAE~|~Median cable barrier. ~|~21 - Safety~|~158CE78C5AAE5DCFC1D3DDFFC5F49FBC59BFF61B 103674~|~1~|~1~|~01/SAE~|~Guardrail upgrades/replacements on various county routes throughout Mahoning County.~|~21 - Safety~|~05E76D12E9BA8B401F6A135D52BD805E7EAF31EC 122357~|~1~|~1~|~01/CMQ~|~Plan split for construction of a new all-purpose trail.~|~28 - Facilities for Pedestrians & Bicycles~|~14C6C7EE4BE32C715014ECD99D1CADAD528ADB6D 122357~|~1~|~2~|~02/ENH~|~Plan split for the STBG set-aside transportation alternatives eligible funded work.~|~28 - Facilities for Pedestrians & Bicycles~|~FFD597780FFC281EDE94CA27CFE22DDF58D2A9E7 91995~|~1~|~2~|~02/STR~|~HIG US62 17.73 - 27.67 ~|~05 - 4R Maintenance - Resurfacing~|~663EB45AF3E60B158F65216F777E64E4BBC2CA59 91995~|~1~|~1~|~01/S<2~|~HIG US 62 17.32-17.73~|~05 - 4R Maintenance - Resurfacing~|~2238481A2D4EDDF1CA094F499B6297A243724D10 91995~|~1~|~3~|~03/STR~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~F182B40CFCC7973BBBC7913200BD0AF972A1764F 125486~|~1~|~1~|~01/MPO~|~plan split for City to resurface Gilbert Avenue and convert travel lanes to bike lanes.~|~05 - 4R Maintenance - Resurfacing~|~68C4E7FB2F12870B9202B815CFBB646B4E2A0308 116829~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8EEAE7CFE2A2A99410A204780FA396E5D0895308 113720~|~1~|~1~|~01/SAF~|~Install roundabout at the intersection of SR-132 and SR-222~|~21 - Safety~|~4A1C27F128F2591490EF6A537818232BAB448D39 113720~|~2~|~2~|~02/SAF~|~100% local match for water line replacement outside of Batavia jurisdiction~|~43 - Utilities~|~0A4B4D5BB4F210831947E929A168F826A5FCBB66 86999~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 690 0.00-1.59 and VIN 327 0.00-4.94. Funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~C229F2CDEBBFEECA21008DD5270A04A5C46F6144 86999~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. ATH 690 1.59-5.00 and HOC 374 17.80-25.15. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~B465AFA075783D1C3259F813B26D4B606647A455 104003~|~1~|~1~|~01/SAE~|~Adding turn lane and change signal at 10C and I-480.~|~21 - Safety~|~190AF12A10AACD1D5776E2E0D212D65D3C755DC9 103449~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 260 6.12. 100% State funding.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4DD22F5DF278764E75B2CA16EE9D2CB1483BB6E 121591~|~1~|~1~|~01/MPO/NORT~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~BCD8D8B5456E5F5760ED35F3D2A34B5B60C80261 108176~|~1~|~1~|~01/NFA~|~ER Event - Repair landslide that occurred along SR 743.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EE5F8A5555729314DCBBC65EEBC68B3E8D268DFA 124062~|~1~|~1~|~01/NFA~|~Bridge Replacement~|~10 - Bridge Replacement~|~8CD20178363464873502D0F6D60D754EACD1A12D 105103~|~1~|~1~|~01/STR~|~Culvert ReplacementROS 138 10.98 CFN 1850766~|~04 - Reconstruction - No Added Capacity~|~E0397671229AC131F60A459869D4F734C07DF3DA 119469~|~1~|~1~|~01/STR~|~Upgrade signs & pavement markings for Simon Kenton Trail~|~21 - Safety~|~832B6F27A5D68155D9F05B81D89B3238AB6801DC 95684~|~1~|~1~|~01/MPO~|~Front St~|~31 - Landscaping & Other Scenic Beautification~|~D4B53B946510061D5D33A133189206E1D61F6E9A 126914~|~1~|~1~|~01/BRF~|~Bridge Replacement~|~10 - Bridge Replacement~|~A4FFBEF94AC3DF6D46B0F31EC67F6FFDE60B9963 88742~|~1~|~1~|~01/S<2~|~?01/S<2/PV/Ming? ? In Mingo Junction reconstruct, rehabilitate and resurface South Commercial Ave on existing line and grade from Wabash Ave to the south end of bridge over Cross Creek. Work includes curb, gutter, sidewalk repair, curb ramps.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C0236519CAD5814C7508356F852BECC0DF78F70 121860~|~1~|~1~|~01/SAF~|~Plan split for intersection improvement work.~|~~|~D564BE5A09344C84236BCC4EE90AAB384CF29DA6 112983~|~1~|~1~|~01/IMS~|~Rehabilitate Bridge HAM-71-0427 which carries Blair Ave over I-71 by replacing the expansion joints, sealing the deck and substructure, painting the structural steel, installing spall protection, and improving the drainage under the structure.~|~13 - Bridge Rehabilitation~|~AB50316CB0EEB3B69731793A52ACDD640802009A 91918~|~1~|~1~|~01/NFP~|~100% 4CP7/ Maint. Funds for 1 year RPMs~|~21 - Safety~|~C834FD5C19F13E3E367273E828BA7663D5785F24 104750~|~1~|~1~|~01/SAF~|~plan split~|~21 - Safety~|~B25D76D3BDCF098B986641C7ECFF010CF2C342F4 92378~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 3006158 GUE SR541 7.46 Intersect: Over Wills Creek; BR Eligible for Rehabilitation: Length=273 SD/FO(1) SR=60.7 DSR=4~|~13 - Bridge Rehabilitation~|~E2AA67598759EAB26D4DFA556FBBB8B3DFCB279F 84571~|~1~|~1~|~01/STR~|~Rural Plan Split for TRU SR 45 21.17 to 26.41~|~05 - 4R Maintenance - Resurfacing~|~8E00FB62B10C98BE8831C8AE73A6198F76177BF1 88554~|~1~|~1~|~01/NHS~|~Concrete pavement repairs on SR 202 from Leo Street (SLM 0.83) to Dayton north coporation limit (SLM 1.99).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CE0A0EC1016F827485407D89D563795F75A71D27 88554~|~1~|~2~|~02/NHS~|~Concrete pavement repairs on SR 202 SLM 1.99 to 2.06 in the City of Riverside.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F6C2C2185AC504F07FDF856B49E648AEA8038A55 88554~|~1~|~3~|~03/NHS~|~Curb ramp work to be paid 100% by the City of Dayton.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2AEA9FD0165DD70062CACB75F3B217EC37C3391C 101875~|~1~|~1~|~01/BRO~|~Bridge Deck overlay on ATH 682 0004 (SFN 0500925). Federal (BR) funds 80% and 20% State.~|~13 - Bridge Rehabilitation~|~0298452D7FEAB858E4B139B7F5C76CB27753D7E0 101875~|~1~|~2~|~02/BRO~|~City of Athens to hang a sign off the bridge. Funded 100% Local 4BG7.~|~13 - Bridge Rehabilitation~|~0562C462FB2AFA20253F33032F38D73CF22FD1CA 108017~|~1~|~1~|~01/NFP~|~Pruning~|~44 - Other~|~318B2DBC70D7D53CD37B71AAF7F16CA74B9DEAE6 97999~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - plan split 01 for Fai-33-2270L~|~13 - Bridge Rehabilitation~|~2AC40CD250891A1595D269699C65D3E1D0D08518 105300~|~1~|~1~|~01/IMS~|~plan split for the resurfacing work on BUT-75~|~05 - 4R Maintenance - Resurfacing~|~AD63812A35A89EB69982E5703BA0767F8F6A1404 103171~|~1~|~1~|~01/S>2~|~Construct left turn lane on SR162 approaching the Copley Circle. Construct a right turn lane on CR-17 (Cleveland/Massillon Road) approaching the Copley Circle, Copley Township, Ohio.~|~21 - Safety~|~D6B57945CC2B1DF3135EB832F4CA02AE2EF4DF39 94154~|~1~|~1~|~01/NFP~|~Repair/replace culvert on SR-163 @ SLM 27.25 in Ottawa.~|~44 - Other~|~F20FC99DB044BA1BDBC12AEDC2D4F7699437A65F 90796~|~1~|~1~|~01/MPO~|~Replacement of defective sidewalks, curbing, alley mouths, driveway approaches and curb ramps, install banners, benches, trash receptacles, tree grates and other assorted amenities, and repair, replacement and installation of landscaping on Watervliet Avenue from Mundale Avenue to Bellaire Avenue.~|~21 - Safety~|~153FF60D3108E9BE53A9FC7906F727F80B62EAB9 102438~|~1~|~1~|~01/IMS~|~Plan split for bridge painting at 90% federal/10% state.~|~47 - Bridge Preventive Maintenance~|~A819F433E4C69591092EC364F3B44CABDF523E4D 111300~|~1~|~1~|~01/SAF/MCEO~|~Muskingum County Engineer's FY2024 pavement marking project funded by CEAO. 4HB7 - see cap comments.~|~21 - Safety~|~C1324D4512E180751345421FB346738F8D746713 79753~|~1~|~1~|~01/IMS~|~Asphalt Concrete Overlay with Repairs MED-271-0.00 to 6.724~|~04 - Reconstruction - No Added Capacity~|~7E9DC35C321C7BF0958429D7AF917F05860F330A 79753~|~1~|~2~|~02/IMS~|~Bridge Rehabilitation Work included with resurfacing project.~|~13 - Bridge Rehabilitation~|~DE6C92984E8A7551777E5B4888B30404EE41F44D 89261~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~52A0952E1F66FCF85E91B62396BCA83180306F29 92888~|~1~|~1~|~01/S>2~|~LOR-83C-0.15 TO 0.33 - Urbanized Area outside of City Fed/State~|~05 - 4R Maintenance - Resurfacing~|~5948E99561C8C9525D396C81920AC26C82BB886E 92888~|~1~|~3~|~03/S>2~|~LOR-10C-0.00 TO 0.20 LOR-10C-0.71 TO 0.77 LOR-83C-0.00 TO 0.15 LOR-83C-0.33 TO 0.75 - Urbanized Area Inside of City 100% Local~|~05 - 4R Maintenance - Resurfacing~|~A533658EF6DAB2408ACDEE424482B623B274E21C 92888~|~1~|~2~|~02/S>2~|~LOR-10C-0.00 TO 0.20 LOR-10C-0.71 TO 0.77 LOR-83C-0.00 TO 0.15 LOR-83C-0.33 TO 0.75 - Urbanized Area Inside of City Fed/Loc~|~05 - 4R Maintenance - Resurfacing~|~1D624BCCE0655254E02428E260CF1C727895AA49 92888~|~1~|~4~|~04/NHS~|~NHS inside of City.LOR-10-6.53 TO 6.77 Fed/Loc.~|~05 - 4R Maintenance - Resurfacing~|~B8F7A354D5CDD6C8F428017D20EBE256D253B907 92888~|~1~|~5~|~05/NHS~|~NHS inside of City.LOR-10-6.53 TO 6.77 100% Local.~|~05 - 4R Maintenance - Resurfacing~|~DFF510F3AF3853D67D8294F1EDC7D5817BFE21EF 109304~|~1~|~1~|~01/SAF~|~Guardrail replacement on various County Routes 100% Safety funding (4HB7).~|~21 - Safety~|~9F1E40BAC8F2A759702DC840012C97562EAEE3CC 114418~|~1~|~1~|~01/STR~|~Resurfacing SR 149~|~05 - 4R Maintenance - Resurfacing~|~9EB8E4B66DD3EE5ED63EA4424F67F5A0D4B23FCE 107440~|~1~|~1~|~01/SAE~|~Signal upgrades on various routes throughout District 4.~|~21 - Safety~|~5D713162022F474CE59D848AF73CCE7A9ADF0200 94266~|~1~|~1~|~01/NHS~|~FY2016 Urban Paving Project in the City of Cincinnati on portions of US 50, US 52, and SR 264. This split is for pay items split 80% State and 20% City.~|~05 - 4R Maintenance - Resurfacing~|~C55B2F50ADD3F0B30D92EF394242D0EAEC627172 94266~|~1~|~2~|~02/NHS~|~FY2016 Urban Paving Project in the City of Cincinnati on portions of US 50, US 52, and SR 264. This split is for pay items at 100% City.~|~05 - 4R Maintenance - Resurfacing~|~C8AD7E9026CCB07377103BC053EE781AA8C54EA0 107564~|~1~|~1~|~01/NHS~|~Resurfacing BEL-7~|~05 - 4R Maintenance - Resurfacing~|~D47E42F1ADE35DECA520AE45D106FE09421843D5 107564~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings delta costs (safety funds).~|~21 - Safety~|~EBFF4E21119B94B29736F6080612A202150D3136 107564~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~F312E20B235B7FFFB79808DDBFFFDEA999A7485C 90231~|~1~|~2~|~02/S<2/JEF~|~Mill and resurface with asphalt concrete CR 22A from US 22 EB off ramp to Wintersville West Corp; includes guardrail replacement, shoulder treatment, pavement markings and curb ramps. Non-NHS portion.~|~05 - 4R Maintenance - Resurfacing~|~0D8EDF667127FDF1A31921675A768B5933F71927 90231~|~1~|~1~|~01/NHS/JEF~|~Mill and resurface with asphalt concrete CR 22A from US 22 EB off ramp to Wintersville West Corp; includes guardrail replacement, shoulder treatment, pavement markings and curb ramps. NHS portion.~|~05 - 4R Maintenance - Resurfacing~|~3E9EC0017A6958894BE6FD2882F294386628F824 115576~|~1~|~1~|~01/STR~|~Asphalt resurfacing project on ATH CR 15 3.18-4.49, CR 16 0.00-3.58, CR 20 1.86-4.56, CR 33 0.00-1.84, CR 42 0.00-8.79. Rural other federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~8D955BA1B255C3BB9D3F4516267964D253A8AAE4 115576~|~1~|~2~|~02/S<2~|~Asphalt resurfacing project on CR 20 1.43-1.86, CR 21 5.85-5.98, CR 25 7.61-8.03. Urban other federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~364CC2E82BB9F655F0AFEEBD85FAA86FD554215F 115576~|~1~|~3~|~03/NFA~|~Asphalt resurfacing project on ATH CR 1 0.00-1.79, CR 21 4.32-5.85 and CR 25 5.75-7.61. Minor collector funded 80 federal/20 local. ~|~05 - 4R Maintenance - Resurfacing~|~ABB46326F1E14599F140240615C50513AA1423A0 90141~|~1~|~1~|~01/STR~|~8603219 WIL SR576 17.72 Intersect: W Br St Joseph River~|~13 - Bridge Rehabilitation~|~936BB17F2A848E075DEED5C52DE2808C90C48CBA 112879~|~1~|~2~|~02/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~ADFF4F7745EFCEBECE75E4B0C12922CDF58B2B0C 112879~|~1~|~1~|~01/S>2~|~STP>200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~C072E0E446CF49BBD33B250F63D3BA6B209DCC9A 102371~|~1~|~1~|~01/NHS~|~Double Microsurfacing~|~05 - 4R Maintenance - Resurfacing~|~ADB24B5D40E628514FFE7B3FC09971BCA1431843 97588~|~1~|~1~|~01/STR~|~ROS US 50 Slide Repair~|~04 - Reconstruction - No Added Capacity~|~2EA2947DFEDE143002E11E1C2F6C8118D993A77E 97588~|~1~|~2~|~02/STR~|~Change Order for emergency repair cost due to a flood event.~|~04 - Reconstruction - No Added Capacity~|~44D19E7D7AEF360A68629FF2A98864A54959A1DA 97423~|~1~|~1~|~01/STR~|~Replace five culverts, of which, three are in a rural area. BEL-149-11.32, BEL-149-13.99 and BEL-800-12.63~|~04 - Reconstruction - No Added Capacity~|~77EB69E3D744DE61578BD85DBF6C522E82960FA6 97423~|~1~|~2~|~02/S<2~|~Replace five culverts, of which, two are in an Urban Area. BEL-40-24.76 and BEL-147-35.04~|~04 - Reconstruction - No Added Capacity~|~F0C1E889B9DB435E0E609E3173FFD8C16AE5351F 109435~|~1~|~1~|~01/STR~|~All resurfacing work on SR 117 in the project. Resurfacing of the realignments with township roads is covered in Plan Split 3. Federal and State funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~9734AF66DF0D972BD8BDC3D2D35BD42AC2CD8BA7 109435~|~1~|~2~|~02/ENH~|~All lighting, curb and gutter, and sidewalk. Includes the drainage and miscellaneous work related to the pedestrian facilities and curb and gutter. Work funded by TAP and focused on transportation alternatives through the corridor. ~|~28 - Facilities for Pedestrians & Bicycles~|~445E4DD0B0C6B5A3759FB3A55289A7AB2E19B0BD 109435~|~1~|~3~|~03/SAF~|~Realignment and reconstruction of intersecting roadways including drainage work along Brentlinger Road. Includes widening of SR 117 for the addition of a left turn lane at Brentlinger Road. Also includes the reconstruction of a portion of SR 117. This work is aimed at increasing safety in and around all intersecting roadways. ~|~04 - Reconstruction - No Added Capacity~|~B9AE680DDB5C1797E91EA13FEFF5FD6C3A6D0D20 106354~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~DBEBE10D7AFC2F2F631C0F850D5E05A319CEE6D7 81510~|~1~|~2~|~02/IMS~|~New alignment of Mt. Everett Road underneath TRU-IR 80-8.56 L&R Structures.~|~04 - Reconstruction - No Added Capacity~|~53591B3B399DBC89444DB762130EEF46A8DE8763 81510~|~1~|~1~|~01/BRO~|~Replacement of sfn#7804172 and sfn#7804148 over Mount Everett Road...initial funding from Eastgate, balance from District Preservation...~|~13 - Bridge Rehabilitation~|~B97EA5D702CB3253BD5CAB420CF988D083A5567C 79385~|~1~|~1~|~01/S<2/FRAN~|~FY2015 Urban Paving in the City of Franklin. This Plan Split is for the Middletown Urbanized area between SLM 28.36-29.43. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~50A2396ACBD6A177B33BB44DBE4886E9E506F6C5 79385~|~1~|~2~|~02/S<2/FRAN~|~FY2015 Urban Paving in the City of Franklin. This Plan Split is for the Middletown Urbanized area between SLM 28.36-29.43. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~D4AE5C624A13312CCFCBEE1F37359A8081562D62 102065~|~1~|~1~|~01/NFA~|~Resurfacing of Memorial Hill Drive in Mill Creek Park.~|~05 - 4R Maintenance - Resurfacing~|~CD1C25784CF3716E90561CF4A02E245CC113560C 107376~|~1~|~1~|~01/IMS~|~Major rehab of IR 75 SLM 14.66 to 17.16~|~04 - Reconstruction - No Added Capacity~|~D8E6D88FF94E7294B64BCF848C6DF6E708C2F016 107376~|~1~|~2~|~02/IMS~|~Resurface pavement to improve friction. ~|~05 - 4R Maintenance - Resurfacing~|~15853348AA1302EB1EFEAA579570FC353B69DDFF 107376~|~1~|~3~|~03/IMS~|~Varying degrees of bridge work, deck patching, widen approach slabs, etc.~|~47 - Bridge Preventive Maintenance~|~A5D33D9D8C81E558ADBFDF3B3E6541A12DD3C766 107376~|~1~|~4~|~04/BRO~|~Temporary repairs to structural steel to address damage from bridge strike~|~13 - Bridge Rehabilitation~|~4FA1E4641B21276CD0F437D7B81FB847D0136A71 107341~|~1~|~1~|~01/NFA~|~D09 PM FY2024 (A)~|~21 - Safety~|~FE6104461D506A2BECBF535F51A3C9DE8598B427 111351~|~1~|~1~|~01/NFP~|~Resurfacing to include R11, Parking at end of R3, RtID: 10, 80, 156, 157 in East Fork State Park~|~~|~5D06CE32A5429F271E6D18EE4E6275FDC2C420F6 115734~|~1~|~1~|~01/SAF~|~2025/2026 Traffic Signal Maintenance~|~21 - Safety~|~78A6A900A03A41A5B2146FE08DA5C89BDA4ECA6B 115734~|~1~|~2~|~02/NHS~|~US 33 Signals~|~44 - Other~|~35B35F327B135748B3E4C31615A7FC7DC34A0096 97012~|~1~|~1~|~01/STR~|~from 0.00 to 2.41~|~05 - 4R Maintenance - Resurfacing~|~5F5180192BB0F968675BFA9B26321277FD0417BB 97012~|~1~|~2~|~02/BRO~|~Replacement of SFN 8706905 & 8706875~|~13 - Bridge Rehabilitation~|~1C23E6458A3A27803712D41B58DC64F6B17CF5B3 90195~|~1~|~1~|~01/IMS~|~District Allocation~|~44 - Other~|~2F517D098F9729A9BFC75A7932ED69CE8DD1D9E2 98775~|~1~|~1~|~01/ENH~|~Abovedeck interior restoration of historic steam powered sternwheel tow boat. Owned by Ohio Historical Society. Funded 80 federal/20 local.~|~33 - Rehabilitation & Operation of Historic Transportation Buildings/Structures/Facil~|~5D5805ED345E629D7012015CD20641312B0C6964 100861~|~1~|~1~|~01/STR~|~JAC 140 0.00-2.46JAC 776 2.87-9.28~|~05 - 4R Maintenance - Resurfacing~|~C706EA682330B3A6C57738B4DFA054C3AEBEA381 100861~|~1~|~2~|~02/S<2~|~JAC 776 9.28-11.44~|~05 - 4R Maintenance - Resurfacing~|~E52D86E262D435AB35BC87B7EE369565701612E3 122052~|~1~|~1~|~01/IMS~|~Plan split represents all work related to roadway construction.~|~03 - Reconstruction - Added Capacity~|~9367B6C081DD7853F3E1B4A7463DF2B6716C1EE0 122052~|~1~|~2~|~02/IMS~|~Plan split represents all work related to bridge construction.~|~03 - Reconstruction - Added Capacity~|~17C1D2B302B23F46B68DD50CC6213FB3B668B335 122052~|~1~|~3~|~03/IMS~|~This plan split represents roadway work associated with Part 2 of the project (PID 124089), which includes mainline I-71 from Findlay to WHV.~|~03 - Reconstruction - Added Capacity~|~66846D9002DFCC9CE9DE2532E1AC11537474958B 122052~|~1~|~4~|~04/IMS~|~This plan split represents the bridge work in Part 2 (PID 124089) and includes the Harrison and Bank Street mainline structures.~|~03 - Reconstruction - Added Capacity~|~03C502D0617AD2C9B74B358D776C0EAFB682BB6C 90466~|~1~|~1~|~01/NFA~|~Deck replacement and repair steel beam and backwalls on WAS 260 0969 (SFN 8403902). Not on any federal aid system funded 100% state.~|~13 - Bridge Rehabilitation~|~51F7027A4A81BBCC954785D3F9EA09EE162262D3 115758~|~1~|~1~|~01/NHS~|~Plan split for the 80/20 (ODOT/City) items on the urban paving on WAR-73 ~|~05 - 4R Maintenance - Resurfacing~|~F2F03087DD437F4CD802146DAE2903600A5B87F7 115758~|~1~|~2~|~02/NHS/SPB~|~Plan split for the 100% City items on the urban paving on WAR-73 ~|~05 - 4R Maintenance - Resurfacing~|~21B62D6E960DE7462B8016E74253D1C9AA94325C 104049~|~1~|~1~|~01/SAE~|~Pavement marking on various routes using 100% federal 4HB7 funds.~|~21 - Safety~|~38643F4B837BF5D6CEAC69E68F2C505FBF026D87 124118~|~1~|~1~|~01/STR~|~VIN SR 327 at the 1.19 Bridge Replacement (SFN 8202109)~|~10 - Bridge Replacement~|~2AEBFEA4F5DB4FDE5D317DDC52A61429F417BABF 101261~|~1~|~2~|~02/S<2~|~Bridge Work~|~13 - Bridge Rehabilitation~|~16EE69DB372A8ED51C6FD47BD67786560102CF58 101261~|~1~|~3~|~03/S<2~|~100% city of Orrville items.~|~05 - 4R Maintenance - Resurfacing~|~E1FFC22DADD3D0D85E2D7A7BB2C5BA18A78DC7A3 101261~|~1~|~1~|~01/S<2~|~Urban Paving - 80/20 Dist/City~|~05 - 4R Maintenance - Resurfacing~|~C06B1FF8E99F0A755232B058C778311594684DD4 101261~|~1~|~4~|~04/S<2~|~Urban Paving 50/50 Dist/Local~|~05 - 4R Maintenance - Resurfacing~|~A3BA2FD0F579321245943BFC3DCAB11D01462C0A 99948~|~1~|~1~|~01/SAF~|~Installing traffic signal on Perry Drive at Jackson Avenue intersection. Includes adding westbound left turn lane on Perry Drive and northbound left and right turn lanes on Jackson Ave. Includes lighting and guardrail work.~|~21 - Safety~|~FA3AE017E9436A8D6F037D81198EC0659FF34C0B 117190~|~1~|~1~|~01/SAF~|~Plan Split for all safety-eligible items.~|~21 - Safety~|~0D8D4BB113E89B529C48F5E6DC8DFA8EEF4CC45B 101409~|~1~|~4~|~04/S<2~|~City of Bucyrus - Split Corp CRA-19-16.08 to 16.37~|~05 - 4R Maintenance - Resurfacing~|~9BBE835D5C883CE26994687531E64835B44F61B9 101409~|~1~|~3~|~03/STR~|~Bridge work on Structures:CRA-19-20.63CRA-19-21.54~|~13 - Bridge Rehabilitation~|~DF125AFC86E77BEC8AEB648F951F6ED6E2DD4B7D 101409~|~1~|~1~|~01/STR~|~STP Rural AC Overlay with RepairCRA-19-16.37 to 23.26~|~05 - 4R Maintenance - Resurfacing~|~84218FA6C3E376CEA4C448191AF839E6D0E4436E 101409~|~1~|~2~|~02/S<2~|~S<2 Overlay with RepairsCRA-1916.08 to 16.37 (Split Corp)~|~05 - 4R Maintenance - Resurfacing~|~63C58133D441438CAEF7BF4404A4D386E72B9FA6 101409~|~1~|~5~|~05/S<2~|~100% City of BucyrusCRA-19-16.08 to 16.37 (Split Corp)~|~05 - 4R Maintenance - Resurfacing~|~98970504DD951BF716B603A9F2E5FEEB919DBCA2 102191~|~1~|~1~|~01/NHS~|~not sure~|~01 - New Construction~|~8FC471CCCC66E1835B2DB9684F09D255E72027D3 93398~|~1~|~1~|~01/STR~|~Field pave invert of steel culverts with concrete. SFN 1100947 CHP 36 2157 Tributary to Buck Creek SFN 1101013 CHP 36 2327 Tributary to Treacle Creek.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8E16B25952B9C260E75A0A5AE9F5984B35972C70 93398~|~1~|~2~|~02/STR~|~Field pave invert of steel culverts with concrete on SFN 1102990 CHP 559 0895 on Branch of Darby Creek.~|~13 - Bridge Rehabilitation~|~A1483864BBE7FCE213C36D0C7F972F406EA62172 84823~|~1~|~1~|~01/BRF~|~Remove existing steel superstructure, widen existing abutments and place rock channel protection in front of the abutments, place a prestressed, reinforced, non-composite concrete box beam deck superstructure, complete all roadway approach work necessary for proper roadway geometrics on Winkler Road in Mercer County. SFN 5430518 MER CR 250 0250~|~13 - Bridge Rehabilitation~|~D5F464EC0A1788E6BF72779EFD7942775CCC066C 115243~|~1~|~1~|~01/SAF/TUS~|~Pavement marking on various county routes with 100% CEAO Safety funding (4HB7). ~|~21 - Safety~|~838C3C39CDF57024BB360A11CF71EA4027A9F646 120086~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~F55F716688F1A66A22917ECE272164FFD4071EA2 111511~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract throughout the District~|~21 - Safety~|~0E9E00FFC37336E0B1E713B8491CB8F8568DB6E0 114835~|~1~|~1~|~01/NHS~|~NHS Plan split for PIC-23-12.89-16.94 repair and resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A537D012B3230D7BE589F9B81B38689F83C5AD02 114835~|~2~|~2~|~02/NHS~|~Construct northbound left turn lane and crossover at the future rest area entrance.~|~04 - Reconstruction - No Added Capacity~|~40CEC9DA7C8007C6D4AFA53470911396A6A64765 114835~|~3~|~3~|~03/STR~|~Plan split for roundabout at 762/Duvall Road - created for ODOT TID funding.~|~04 - Reconstruction - No Added Capacity~|~3CDD83DB5C345C235BAE92C77EEA93DE95FBAFFB 94212~|~1~|~1~|~01/STR~|~This plan split includes rehabilitate of bridge PRE-122-0155 over Fourmile Creek and all associated roadway / guardrial work.~|~13 - Bridge Rehabilitation~|~201DD166EE423CACD8F603365ACB5BC92D616EA8 90413~|~1~|~1~|~01/BRF~|~Project includes replacing structurally deficient Bridge No. PRE-CR 80-0010 (SFN: 6835643) which carries Barnets Mill Road (CR-80) over Seven Mile Creek. Work includes minor approach work, pavement repairs, and vertical alignment adjustments, as necessary.~|~10 - Bridge Replacement~|~FFDBF06EE32DD892B067DFFF1E7A3837C212F526 119430~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs ASD-95-6.49 to 13.499, ASD-511-18.329 to 22.980~|~05 - 4R Maintenance - Resurfacing~|~50449F56FD565F190017C3844C704275E8E7B7EE 92452~|~1~|~1~|~01/SAF/FIND~|~This split is for work eligible for funding from the central office controlled safety program. ODOT Safety Program Manager Michelle May approved $406,800 in safety funds for construction in an October 27, 2011 IOC. The City of Findlay is responsible for a 10% local match. The City of Findlay is also responsible for the additional funds if more than the capped amount is needed.~|~21 - Safety~|~C5563617C3BC57F95AB683FC87053A02F2F7EEB9 97503~|~1~|~1~|~01/BRO~|~Plan split to program project. Update after scope of work is complete.~|~10 - Bridge Replacement~|~C59BCA853B08EB9ECDF6AF4DBFF7C40F8FB4B0B0 106004~|~1~|~1~|~01/NHS~|~Landslide repair project. ATH 50 16.65. DSR ATH-003. NHS route funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F34A3F105CC028BE95F7BB3C8F9D2780AB49BB95 93374~|~1~|~2~|~02/NHS~|~Priority system paving of FRA-161: 13.97-15.06~|~05 - 4R Maintenance - Resurfacing~|~4410F5E2866B120A6DF92DB4A1C5373271537364 93374~|~1~|~1~|~01/NHS~|~Columbus urban paving of FRA-161: 10.58-13.97~|~05 - 4R Maintenance - Resurfacing~|~7D584E8C9FCA5602C299918A5319C7F7D42B8B2C 125025~|~1~|~1~|~01/IMS~|~Addition of a third lane in each direction and reconstruction of existing lanes~|~03 - Reconstruction - Added Capacity~|~02FB5AB96922DBEC4914240AA7D5D80FBD0287DB 84240~|~1~|~2~|~02/MPO~|~Locals responsible for funding over the maxed cap in CO CC 1 for widening on Austin Pike from two to five lanes along with the widening of a bridge in the project area and a recreational trail being constructed on one side of Austin Pike. A new traffic signal and lighting will also be added.~|~03 - Reconstruction - Added Capacity~|~7ED7B912B8E5F9F6D126A98AF1BAA92608C8498B 84240~|~1~|~1~|~01/MPO~|~Widening of Austin Pike from two to five lanes, widen bridge in the project area, construct a recreational trail on one side of Austing pide and add a traffic signal and lighting. Project cap = $1,500,000 Federal max.~|~03 - Reconstruction - Added Capacity~|~A9B2108FB6571E9A59140FDC9758491958D73B5C 108780~|~1~|~1~|~01/STR~|~Plan Split~|~17 - Construction Engineering~|~A4D8E47EE673A580114959308A1D8A8C7EFFD84B 82291~|~1~|~2~|~02/NHS~|~Four-lane resurfacing project using a mill and fill treatment in the City of Athens. ATH 50 9.18-11.56 Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~BF2BB7FBF6CFB53464C1A9C369975FA4C4FBFA1A 82291~|~1~|~1~|~01/NHS~|~Four-lane resurfacing project using a mill and fill treatment. ATH 50 1.74-4.99, 9.18-11.56 and ATH 32 0.00-1.42. NHS Federal/State 80/20%.~|~05 - 4R Maintenance - Resurfacing~|~E99AA22D37A121A2EA1944E16D95FA019DBE707F 116823~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~BA00BF6E25E2B14FCC87A87F565EFA15F568A11B 110429~|~1~|~1~|~01/ENH~|~Construct new pedestrian tunnel under Fulton Ave.~|~08 - Bridge - New Construction~|~8BC0D31DFB7C97C3542240BEDE83A37F9E44BBD9 110429~|~1~|~2~|~02/ENH~|~Construction of pedestrian path, retaining walls and security lighting.~|~28 - Facilities for Pedestrians & Bicycles~|~07CA397EE5405B6E270F40FB1082EFFC6F20020D 110429~|~1~|~3~|~03/ENH~|~Sewer relocation.~|~43 - Utilities~|~2C30051E6BE1FF5357BE8B819E6415EC3C45C049 76408~|~1~|~1~|~01/NHS~|~not BR Eligible: SFN 7801688 3.89 SR11 under liberty St. CR352.~|~13 - Bridge Rehabilitation~|~3B0442F5D1469F2F4B3B2653E317B7A03C96FD36 76408~|~3~|~3~|~03/BRO~|~BR Eligible: SFN 7801777 7.05 SR11 Under Anderson-Morris Rd.~|~13 - Bridge Rehabilitation~|~86BC59FBD9B91B689B8327A71D42A7E8D41F4C80 76408~|~2~|~2~|~02/BRO~|~BR Eligible: SFN 7801718 6.22 SR11 Under Tibbets-Wick Rd CR28.~|~13 - Bridge Rehabilitation~|~BD53D3393BAD8FD510AE803119CEA2C55C115078 76408~|~4~|~4~|~04/BRO~|~BR Eligible: SFN 7806639 1.29 SR304 over SR11 4.52.~|~13 - Bridge Rehabilitation~|~CCE30120A025F33D2AF90897ABAADAD0E3F50C21 87369~|~1~|~1~|~01/BRO~|~Replace bridge substructure on SFN 0602434 AUG 75 12.34 on Interstate 75 under CR 208, National Road.~|~10 - Bridge Replacement~|~CB1EAD765C8603DBC3442FB23EAF489CC95FF676 111012~|~1~|~1~|~01/SAF~|~Signal upgrades along SUM SR 261 at Dart Ave and Rand Ave.~|~21 - Safety~|~9A27C1B6F56527CE60B0704128DA14EEF2F2716B 111012~|~1~|~2~|~02/S>2~|~Resurfacing of SUM SR 261 from 8.11 to 8.42 in the City of Akron.~|~05 - 4R Maintenance - Resurfacing~|~5A6F16676983CBD76307A71D3713E3425E6F3EE3 111012~|~1~|~3~|~03/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~2477F3A46905ADAEEF5183CA8761EA240B8A8ED3 97848~|~1~|~1~|~01/BRO~|~OBPP replacement of CO SFN 4133021~|~10 - Bridge Replacement~|~F10062924AD4E196B55C7C805BD1DFD28DA56AD8 107798~|~1~|~1~|~01/IMS~|~Construction of Type II noise barrier along IR-480 at 90% federal/ 10% state participation~|~44 - Other~|~3B92C5D97A448A0C632F31166711620F4B520D55 89474~|~2~|~2~|~02/S<2~|~"02/S<2/PV/TUS" - URBAN resurfacing of CR 80 from SR 516 to IR 77.~|~05 - 4R Maintenance - Resurfacing~|~350EA17038A774D78BC04EA26E54F438FB0898CD 89474~|~1~|~1~|~01/STR~|~"01/STR/PV/TUS" - RURAL resurfacing of CR 80 from SR 516 to IR 77.~|~05 - 4R Maintenance - Resurfacing~|~EE8EE1DEC50EC88872AD74072AB453A860910124 93868~|~1~|~1~|~01/NFP~|~ODNR Microsurfacing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~20A195B2A52DC778B51AA1A43CC770C5F8991948 99788~|~1~|~1~|~01/BRO~|~Split for work on LAK-271-0145 SW: 4305523~|~10 - Bridge Replacement~|~117C392B0643A77F656CD16DD1330A84527BC9C2 99788~|~1~|~2~|~02/IMS~|~Split for work on LAK-271-0127 SW: 4305469~|~10 - Bridge Replacement~|~42D45D840B2BA59385551160A74467A3DE41C6FA 117951~|~1~|~1~|~01/SAF~|~Reduce the negative offset of the left-turn lanes by removing the center medians near the intersection of Bethel Road and Dierker Road.~|~~|~76F299593C1C1F22DBCB52FDE5CCB9B9B93CC694 103422~|~1~|~1~|~01/NHS~|~2.5" Mill and fill in the City of Kettering - UPP.~|~05 - 4R Maintenance - Resurfacing~|~BA0278D34775407A468633C0B96A55F7B78C1C35 103422~|~2~|~2~|~02/NHS~|~100% local funds to pay for man-hole castings~|~05 - 4R Maintenance - Resurfacing~|~E28E76C202593F649CD9506D40EC8C1DA441C232 113318~|~1~|~1~|~01/NFP~|~Replacement of CFN# 1847142 along State Route 82 in Trumbull County, Ohio.~|~44 - Other~|~15CEA164C59A7789A78439D3EBB737BDA089A754 115376~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4.~|~21 - Safety~|~DAF3C818193EB12B5FFAE436E47A23E4FD9C5A28 120353~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties. ~|~21 - Safety~|~9185ED337CB73F7B7845B894584AF7902718817C 115361~|~1~|~1~|~01/SAF/NLEX~|~01/SAF/OT/NLEX - 100% Federal (80% 4SC7 and 20% TRC) - installation of shared use pathway along Panther Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~ABC52FBCD10AA8CE75F2A09D8836D57BDDC78984 118762~|~1~|~1~|~01/NFP~|~Cleaning and sealing bridge decks throughout D11.~|~47 - Bridge Preventive Maintenance~|~527CB29162F3EDD45E34283A1B9729ED658F1034 91962~|~1~|~1~|~01/STR~|~General System asphalt resurfacing of BEL-800-0.00 to 9.78 and 10.21 to 25.04; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~A9BCDE50855B3C6C9418811C052F2BDF7A9246AF 112872~|~1~|~1~|~01/S>2~|~Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F25CC8A9C45D40B48C06BCE7447131D8829006DC 112872~|~1~|~2~|~02/NHS~|~NHS Plan split~|~05 - 4R Maintenance - Resurfacing~|~97112BB5FAE017DE1D9FDAB4709799F0E9F9611A 126074~|~1~|~1~|~01/SAF~|~Plan split for pavement markings~|~21 - Safety~|~D38C120483937D83BBDD4CF874A6502ED349AC3F 104757~|~1~|~1~|~01/NFP~|~Spot Paving various routes in POR, STA and SUM Counties.~|~05 - 4R Maintenance - Resurfacing~|~1CF7F6AB01417BDD28FF1433023DEB068480A0C2 104757~|~1~|~2~|~02/NFP~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~3F3F7EA0D243A77B0663E8BD8322804C4BB85061 81338~|~1~|~1~|~01/SAF/WADS~|~Pavement reconstruction and widening.~|~21 - Safety~|~553C90BEF3E6B0B2E12FE9D93E3DE23108D31A9B 81338~|~1~|~2~|~02/SAF~|~100% local items.~|~21 - Safety~|~9BD797073FC9287D2BA7A364834F4816D389A287 91733~|~1~|~1~|~01/NHS~|~ Minor rehab on US 27 in Butler County from the Hamilton County to SR 129~|~05 - 4R Maintenance - Resurfacing~|~A8541F5324865542BB705F5369F85F94D6E6B1FB 91733~|~1~|~2~|~02/S<2~|~Plan split for work on the tin section of SR 129 at the intersection in Millville~|~05 - 4R Maintenance - Resurfacing~|~9C54D677C1C8C9BE2F77535FA6D0DF6F92BB2E0B 106647~|~1~|~1~|~01/ENH~|~Construct a bikeway to connect the Hockhocking Adena Bikeway with the Village of Chauncey. Funded 95% federal/5% local.~|~28 - Facilities for Pedestrians & Bicycles~|~EE1281D52EF48E1962D2EEDCF21035B11AA9582B 123983~|~1~|~1~|~01/STR~|~Culvert replacement. MOE 556 0.54, CFN 1802911.~|~~|~EF0B02C6BCE7A8FE117D478FD7135D31D242DF27 119782~|~1~|~1~|~01/STR~|~added plan split.~|~66 - Resilience Improvement - Highway Project ~|~461A7EFA6005FF092957EAA42BD724414824BDC2 113063~|~1~|~1~|~01/IMS~|~All work in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~95FBEB47E9191DF0759FF521CE17BFC1F11AEC64 78572~|~1~|~1~|~01/NHS~|~Fill in the gypsum mines under SR-2 in Ottawa County.~|~44 - Other~|~2455C1D46B2ADC250AA33BB07E48AB53DAA1CE57 110554~|~1~|~1~|~01/IMS~|~Repair the bridge size culvert at I-275 over Hall Run. Rehab shall reconstruct trash Rack, remove Debris, control erosion and drainage issues, patch concrete, and repair scour . Drainage, erosion, shallow slides, access road, gate and fence.~|~13 - Bridge Rehabilitation~|~CB4CE84C5D92A8E62F2F27AC2F8D870685B997BC 93925~|~1~|~1~|~01/S>2~|~SR-2 from SLM 15.27 to SLM 17.82, all pavement work from face of curb to face of curb and to a depth of 3.5".~|~05 - 4R Maintenance - Resurfacing~|~69BAE1FAA0AE28EA91628DECAA097833A2B06921 93925~|~1~|~2~|~02/NFP~|~SR-2 from SLM 15.27 to SLM 17.82, all work outside area from Face of curb to Face of Curb and full depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~919CEDA85D3541F484D93E6E30364DC4E33CA1A1 108406~|~1~|~1~|~01/STR~|~DSR HOL-001 from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5298E01C341A8FEA8013948A582B5A9D1BBBD8F0 108406~|~1~|~2~|~02/STR~|~DSR HOL-002 from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E50110EF69F11281EC0D2F72039B89190ECC7689 117546~|~1~|~1~|~01/NFP~|~All items of work associated with DDMS signs and CCTV cameras~|~24 - Traffic Management Engineering - HOV~|~66DD270365AC3F4B69256A0E4ED2BF748C299F2A 117546~|~1~|~2~|~02/NFP~|~Installation of traffic monitoring cameras along IR 70 in MUS~|~21 - Safety~|~A162344CA9828528F0263A9A8AF5B30A830CD4FB 105106~|~1~|~3~|~03/S>2~|~Chip seal on:WAR-123 SLM 7.20 to 7.72~|~05 - 4R Maintenance - Resurfacing~|~563882CD839C412EBBB3FCFE563E9B8F769965A8 105106~|~1~|~2~|~02/NFA~|~Chip seal on:CLE-727 SLM 2.49 to 3.79~|~05 - 4R Maintenance - Resurfacing~|~C4BC38449594A477588C7907B09DB4DBEA34CA6E 105106~|~1~|~1~|~01/STR~|~Chip Seal on:CLE-133 SLM 31.16 to 34.57CLE-133 SLM 34.57 to 37.37CLE-727 SLM 3.79 to 5.46WAR-123 SLM 0.06 to 7.20WAR-132 SLM 0.00 to 3.03WAR-132 SLM 3.57 to 5.06~|~05 - 4R Maintenance - Resurfacing~|~C214B88370C640782A174A07E3FFD6A14876E5EA 83261~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 180 0403, SFN 3702820. Rural other ferderal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~AB3F2BD3F9656D1938E47786B237426845D0028A 108746~|~1~|~1~|~01/NFP~|~D09 Deck Sealing Project FY2025~|~47 - Bridge Preventive Maintenance~|~3AD15071ACCC13D3DCD22BBA315D25651950C571 117104~|~1~|~1~|~01/ENH~|~All work being completed in this project is in this split. 95% federal funds with Toll Revenue Credit from the Transportation Alternatives Program (TAP). The local match and funds needed over the TAP cap to be provided by the Village of Antwerp. ~|~28 - Facilities for Pedestrians & Bicycles~|~156C0492B54091F1F1374B248E24EAE7872864AE 96183~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using the District Preservation Program SACs 4PF7 and 4PS7.~|~44 - Other~|~E07617E4F2E43A3215A68933D111766C7D5DD49E 123421~|~1~|~1~|~01/NFA~|~Resurfacing SR 646~|~05 - 4R Maintenance - Resurfacing~|~17E0B682F876C84E5F2A669D7D9E3D76E7699F64 97380~|~1~|~1~|~01/S<2~|~Mill and fill existing pavement beginning at Vandemark Road and ending at the I-75 overhead structure. Pavement planing and resurfacing with asphalt concrete SR 47 fomr Fourth Street (SLM 14.51) to Ohio Avenue (SLM 15.46).~|~05 - 4R Maintenance - Resurfacing~|~D6C72394898E6532D4F6DE2799D735C62CCE76A3 97380~|~1~|~2~|~02/IMS~|~Paving on Interstate Ramp on IR 75 in connection with local project.~|~~|~9004E8F32C7029CAD49E4D6E0C6FB04ED6EF55E0 85073~|~1~|~2~|~02/S>2~|~100% State funds for eligible work in the Village of North Randall in the split corp section from SLM 9.12 to 9.20.~|~05 - 4R Maintenance - Resurfacing~|~1E565C604C59826FFB0C60BAD6E74DBCB5CBC3AE 85073~|~1~|~1~|~01/S>2~|~85/15 state/local funding split for work from SLM 9.12 to 10.61 that is eligible for urban paving funds within the City of Warrensville Hts.~|~05 - 4R Maintenance - Resurfacing~|~22BBE336579B877B46DCFE7A5178BF43E29F1ADE 85073~|~1~|~3~|~03/S>2~|~100% local participation for work items especially ADA compliant curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~C2D63EA4688C9257847A960CDB3E043D4BF98122 120345~|~1~|~1~|~01/S5K~|~Implement safety countermeasures. ~|~21 - Safety~|~C428B95A0A2371D982C539A057ACFC54E582C26F 125951~|~1~|~1~|~01/NFP~|~Plan split for crack sealing using preservation fudning~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~16B31CFFDD9BB223BBE18B0ADCDA5FA7EA1467C3 99849~|~1~|~1~|~01/MPO~|~Resurfacing Whipple Avenue.~|~05 - 4R Maintenance - Resurfacing~|~158A78A56CEC0572343F83187FE45C319D3694B2 92966~|~1~|~1~|~01/STR/KCEO~|~"01/STR/OT/KCEO" - Knox County Bridge replacement~|~10 - Bridge Replacement~|~61B37FBE995A58B66779BAABA98C6FD7EC08C9C4 108060~|~1~|~1~|~01/NHS~|~Replacement of the linked structure > 20' span.~|~~|~A8EEB78C72C8792A8EDE0007464CC60126DAB5D0 100518~|~1~|~1~|~01/STR~|~BRO 62 26.98~|~04 - Reconstruction - No Added Capacity~|~DE27E77097D0300E4666C8D81248F6CB6F900C49 126307~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~107A0A47549279FF71E620D299121A4A682F8CDE 101709~|~1~|~1~|~01/NFP~|~Statewide traffic signal upgrade contract~|~44 - Other~|~0EAD296A2C77CE9FDA5822A3D452165FD9E8DB53 115762~|~1~|~1~|~01/NFA~|~Asphalt resurfacing project on Florence Street in City of Belpre. WAS MR00041 0.04-0.87 (Florence Street). 100% C227 funds. ~|~05 - 4R Maintenance - Resurfacing~|~46A9D62B8E803D9442483A4C8AA999BFD02724FB 115762~|~1~|~2~|~02/S<2~|~Asphalt resurfacing project on Belrock, Poplar and Braun Streets in City of Belpre. WAS CR00002 0.00-0.62 (Belrock, Poplar, Braun Street). 100% C227 funds.~|~05 - 4R Maintenance - Resurfacing~|~2B0F36031973D3F768865F829A2D053C0FE25EA6 102419~|~1~|~1~|~01/S>2~|~MAH SR 164 from 5.71 to 7.43~|~05 - 4R Maintenance - Resurfacing~|~228146CA48E80F7896DCA43DFE89976D110B9459 102419~|~1~|~2~|~02/STR~|~MAH SR 164 from 3.59 to 4.85 and 5.22 to 5.71 MAH SR 165 from 16.64 to 21.80~|~05 - 4R Maintenance - Resurfacing~|~A9FC07CB2DB403B865C5D0EB25D4E1FB59B7ED67 118008~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at WAY-94-18.21/SR-585/SR-604 (Safety Funds)~|~21 - Safety~|~987B9299AFFD37040B46EC6F2FB4BC866F7474B9 119080~|~1~|~1~|~01/STR~|~Plan split for work in rural location.~|~13 - Bridge Rehabilitation~|~AA21C11C894A187FB02117454E804C5C9037D356 119080~|~1~|~2~|~02/S>2~|~Plan split for work in large urban location.~|~13 - Bridge Rehabilitation~|~7CF560CAA58FE0104FB55A8A7590DD6DBEFE91B1 123855~|~1~|~1~|~01/BRF~|~Plan split for bridge work using municipal bridge funding for rehabilitation of an off-system bridge at 100% Federal funds~|~13 - Bridge Rehabilitation~|~85D757402D6C67662BA97D4C7D27F093BC5A4E13 100918~|~1~|~1~|~01/S<2~|~Overlay with asphalt concrete various routes in Auglaize County: AUG SR 66 SLM 0.00 to 2.02 AUG SR 119 SLM 5.17 to 5.81~|~05 - 4R Maintenance - Resurfacing~|~E03FE7B0DCB596B6C4AD753F66C4B1705AD74E0F 100918~|~1~|~2~|~02/NHS~|~Overlay with asphalt concrete US33 in Auglaize County: AUG US 33 SLM 27.64 to 29.20~|~05 - 4R Maintenance - Resurfacing~|~FE3AABA6938D8EA75147B9E61AEC890561563635 100918~|~1~|~3~|~03/STR~|~Overlay with asphalt concrete SR29 in Auglaize County: AUG SR 29 SLM 9.67 to 10.95~|~05 - 4R Maintenance - Resurfacing~|~F6BE21065A0B76F5B408C3DE0380CD7357CE2B2E 126104~|~1~|~1~|~01/BRO~|~Plan split for all work associated with HEN-110-0901 bridge~|~13 - Bridge Rehabilitation~|~2D0D9AA1B81D5F292BAA2F5FB78F3C4152A5B37F 112127~|~1~|~1~|~01/SAF~|~Safety funded items plan split~|~21 - Safety~|~FA58BC1045B69675D2A7684B968288305D28245B 112127~|~2~|~2~|~02/NFP~|~Plan Split for 100% local items added to the project, including relocation of the curb line~|~21 - Safety~|~CE6E9A880B4607A66DE6E9D92A09F0CECA5537E4 116200~|~1~|~1~|~01/BRF~|~Complete bridge replacement utilizing 4R87 Federal funds at 100% up to maximum.~|~10 - Bridge Replacement~|~A78C4C6DB7F804F974EF6453FD7882F321EFB13D 114416~|~1~|~1~|~01/SAF/BHJ~|~Intersection improvement project funded at a maximum of $500,000, using 100% (4SH7) Local Roads Oil and Gas Shale Program.~|~21 - Safety~|~B4C453F1C98A718673EC354C5C9A6914C5618D68 116276~|~1~|~1~|~01/NFA~|~Resurfacing SR 646~|~05 - 4R Maintenance - Resurfacing~|~3BFF74B0DE2EDF9AFA7B2D00B837DA646DCB1D4F 87855~|~1~|~1~|~01/NFP~|~Funding split for construction using bond funding.~|~13 - Bridge Rehabilitation~|~DE82EC8B112508B8ED3A67848CF26220524E6ECE 111251~|~1~|~1~|~01/ENH/ASMP~|~Construct multi-use trail from Maple Ave Trailhead to Leon Rd (Phase 1.1) and between Main St to just south of Marvin Rd (Phase 1.2).~|~28 - Facilities for Pedestrians & Bicycles~|~92870A07BCDEA3D68FED7F034908A80C90912571 111251~|~1~|~2~|~02/ENH~|~trail~|~~|~E128642395B1AEAB262ED44D8CB3A322D8118ACB 25795~|~1~|~2~|~02/IMS~|~80/20 fed/state funding split for added capacity~|~03 - Reconstruction - Added Capacity~|~8402B5BB4EF7D2C0A99C6BA0D2DA0FD54BB2B8B6 25795~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for replacement of existing pavement.~|~03 - Reconstruction - Added Capacity~|~F65AB9F96EC8CF4D7E4B10C2DFBD5B6ADD0C2493 102170~|~1~|~1~|~01/NFA~|~The City is constructing SR741 road improvements to support a new Masters harmaceutical headqtr and distribution. Adding a northbound left turn lane and southbound right turn/deceleration lane and related intersection improvements to align with Weldon Dr.~|~01 - New Construction~|~F8D0DBF09FCEFAE14707504CC5526B614C8F12BA 104853~|~1~|~1~|~01/NFA~|~The DCED will assist the Hornish Group in constructing a new access to SR 281 approximately 500 feet north or SR 18 and closing an existing access point on SR 18 approximately 500' east of SR 281~|~01 - New Construction~|~720B6987639F05C2EC1582969AE27A015574F354 107418~|~1~|~1~|~01/IMS~|~Split for median barrier replacement~|~44 - Other~|~121A7DEB87C8142F839A6D276E8739868D9C9A5F 23104~|~1~|~1~|~01/STR~|~Railroad Grade Separation project in the Village of Wellington.90% TRAC / 5% Railroad / 5% Wellington~|~22 - Rail/Highway crossing~|~6A585B0863E5B45C0E7B340769014AFAF605A62D 23104~|~1~|~2~|~02/STR~|~TRAC Funded (4BK7/4BD7) On going services and "as Built" plan development~|~17 - Construction Engineering~|~D43D750481957FD4A48B00BD2081435A98DA9E4C 96402~|~1~|~1~|~01/NFP~|~New Ross County ODOT Garage~|~01 - New Construction~|~FDBAD17EBCD4865C8D8937F96FA81AB1C6A1EF51 116832~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~F69B4DB2E679DEB7A21107852580E801EB21C45A 89173~|~1~|~1~|~01/BRO~|~Bridge replacement project. GAL 160 2.45, SFN 2702045. BR eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~C6E99451ECE18371B3A06314F6A3F6B3D09EA834 89173~|~1~|~2~|~02/S<2~|~Resurfacing GAL 160A 0.00-0.74 using an asphalt overlay treatment. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B1BB1040A84C04904045E88B80E62AC02CE01045 97755~|~1~|~1~|~01/NFP~|~Removal of underground storage tanks at the Madison County Garage~|~44 - Other~|~2FD104DEB10751410247A241A888A1E7732E02A5 114590~|~1~|~1~|~01/STR~|~Landslide repair project. MEG 681 4.78. Work includes dig out and replace.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9EF8E9C0A104AA908898C7E704FDA5025C191419 120465~|~1~|~1~|~01/NHS~|~added plan split.~|~~|~1725D629C11AFEAFDFBF51FABC507436EC7177E9 110472~|~1~|~1~|~01/SAE~|~Project to improve the safety and operation of the intersection of SR 47 and SR 235~|~21 - Safety~|~F6C4AEBBE58B33E8001EDE4AF74132845BEA677C 114868~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip seal treatment. Funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~B63D70793FE3005F488CF62161EACC80E42C518A 114868~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using a chip seal treatment. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~A11DB148D37B3530CDD79A3A00869A0A8EB7C07D 114868~|~1~|~3~|~03/NFP~|~ODNR project to resurface roads in Burr Oak State Park. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~26E45B1090D57AFA5D944CCE6E0F48DAFEBE324B 123229~|~1~|~1~|~01/STR~|~450ft. landslide repair on SR 78 24.58 - 24.61mm.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F4CBA5AF6293FE77ECD013CD2C35F2CB0F055195 88721~|~1~|~2~|~02/SAF~|~MOT SR 48 19.10 at the Clayton corporation limit - have to curb ramps install/updated to current standards and to have a uniform installation of the curb ramps.~|~21 - Safety~|~99EDA8DE2338EE0CF615ACCDE17925F4C492EC6C 88721~|~1~|~1~|~01/SAE~|~Signal system upgrade on MOT State Route 48 (SLM 16.21) from Waverly/Wampler to Westbrook/Dog Leg (SLM 19.10).~|~21 - Safety~|~C0D0CEB8C3BEC206E3AD04F5064454DDAC181B94 107347~|~1~|~2~|~02/SAF~|~TSMO funds for traffic camera installation at NOB 77 11.20 (Belle Valley), WAS 77 16.41 (Macksburg) and WAS 77 6.12 (Lower Salem).~|~21 - Safety~|~D429373A13EB3CA95488C23C0B9A54A01EE954E0 107347~|~1~|~1~|~01/IMS~|~Lighting project in D10 for FY2024 on Interstate Routes. Funded 80 federal/20 state.~|~21 - Safety~|~6F2D9F386DE84E30FEB7F784A4B975A06DF63EF4 107347~|~1~|~3~|~03/STR~|~Lighting project in D10 on rural routes. Funded 80 Federal/20 State.~|~21 - Safety~|~1A22A219AB94BA124417BE0F993344ECB7F7EA01 101581~|~1~|~1~|~01/S<2~|~DSR# JEF_016~|~04 - Reconstruction - No Added Capacity~|~38CD885C9871ADAB14B50316042FE8847AC04AAB 86170~|~1~|~1~|~01/ENH/BEL~|~"01/ENH/BR/BEL" - CR40B ~0.5 mi E of Lloydsville over Wheeling creek and TR814 ~0.5 mi E of Morristown over Barkcamp Creek; reconstruct 2 historic stone arch bridges on the old National Road. The project is funded through Transportation Enhancement program. Toll Revenue Credit capped at $118,597, with the remainder of TE funding at 80% TE/ 20% Local participation.~|~30 - Scenic or Historic Highway Programs~|~467D756134AF6AFB73EF8D215D70FA4494B7661F 78278~|~1~|~1~|~01/NHS~|~Reconstruction and realignment of POR-SR14, from SLM 12.40 to SLM 12.90, and POR-SR59 from SLM 9.04 to SLM 10.03 in Ravenna Township, Portage County, Ohio.~|~21 - Safety~|~886C2989A74F089E374170444CF9440A6181C886 79977~|~1~|~1~|~01/STR/Stat~|~It is proposed to construct a new 4-lane, limited access highway to bypass Portsmouth, Ohio. Phase 2 begins @ CR 28 (Lucasville-Minford Road) and ends at US 23 at Lucasville. Phase 1 is 19415, Phase 2 is 79977, & Phase 3 is 77366. ~|~01 - New Construction~|~7B4F857A7D139C1F3236612C8CA8991F0967495A 114328~|~1~|~1~|~01/SAF~|~Signal upgrades.~|~21 - Safety~|~C05ED567AACE1F576250CFF43B3942A56445ACE1 96574~|~1~|~1~|~01/NFA~|~Funding for the maintenance facility construction~|~01 - New Construction~|~99B9B4D4A9A7A9A4522FD2F0F34CAADDCBE22F49 113087~|~1~|~1~|~01/NFP~|~CE Inspection~|~17 - Construction Engineering~|~1EA8CB5F78D8D8071CB275A3DC579858E39C2DE2 113087~|~1~|~2~|~02/NFP~|~CE EINSP Plan split.~|~17 - Construction Engineering~|~089FDCAAC257029D8A2907AE201A221A21B63348 113087~|~1~|~3~|~03/NFP~|~CE INSP FY28 plan split.~|~17 - Construction Engineering~|~03368880B0ADC78738484B0EF983A4E5715EE4C2 98990~|~1~|~1~|~01/STR~|~Replace the exisiting bridge deck with a 8.5" composite concrete deck and widen the existing walks, replace the expansion joints and bearings on SFN 7530757 - SHE CR 8 5.01~|~13 - Bridge Rehabilitation~|~2E0879CFFA5051BB3D939314C93635E285B44B2D 95197~|~1~|~2~|~02/NFA/GCEO~|~"01/STR/PV/GCEO" Guernsey County Engineer CEAO Minor Collector Route -CEAO federal max at 80% 2,496,480~|~05 - 4R Maintenance - Resurfacing~|~BE3FA9DD41B16C5A161A9E8A954241A48EA91D20 95197~|~3~|~3~|~03/S<2/GCEO~|~"01/S<2/PV/GCEO" Guernsey County Engineer CEAO Urban Minor Collector - CEAO federal Max $2,496,480.~|~05 - 4R Maintenance - Resurfacing~|~7520023B7BFE6A5A44B6440546046BC540B6429A 95197~|~1~|~1~|~01/STR/GCEO~|~"01/STR/PV/GCEO" Guernsey County Engineer (Rural Major Collector) CEAO funded project with a maximum dollar at (80%) of $2,496,380~|~05 - 4R Maintenance - Resurfacing~|~203ACF7E1649BF3A8B4210610C203FE97E8B196B 96787~|~1~|~1~|~01/S<2~|~General System resurfacing including pavement repairs and shoulder rehab on COL-164-21.54 to 24.31.~|~05 - 4R Maintenance - Resurfacing~|~181E78F8FD364D11D900530754900D6C711C3945 96787~|~1~|~2~|~02/NFA~|~Gewneral System Resurfacing including pavement repairs and shoulder rehab on COL-164-18.00 to 21.54.~|~05 - 4R Maintenance - Resurfacing~|~BCD7080A09CA6D3B0AAF869B35EE65066B68D26E 108279~|~1~|~1~|~01/STR~|~Emer. Plan Split~|~21 - Safety~|~23DF3BEB4A59FFC4DC0D4CBF6F60DFECD901F5B2 110848~|~1~|~1~|~01/NFA~|~Replacement of structure > 20' span.~|~10 - Bridge Replacement~|~16447179E17EA2430CB7359D8E91F2C3018A3166 126338~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~B3889DE2B14B364339E95B85DEB6C368C2D7F421 87708~|~1~|~1~|~01/IMS~|~Resurfacing~|~17 - Construction Engineering~|~89176AC9188595A82C0FC2F647CF17A5A33F78D4 94397~|~1~|~1~|~01/STR~|~2 Lane Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A69092AB4D50776A3E4D9D25D3AE7E65746F94D7 94397~|~1~|~2~|~02/STR~|~Bridge Work: LOR-301-0.15, LOR-301-1.64, LOR-301-9.19, LOR-301-10.97~|~47 - Bridge Preventive Maintenance~|~8FD11867B7658ED58A974D8EFDD1693247DE1293 109580~|~1~|~1~|~01/STR~|~Chip sealing~|~05 - 4R Maintenance - Resurfacing~|~6A0C12C96885DD7E3B26A681027FF08AD4B849B3 109580~|~1~|~2~|~02/S<2~|~Chip sealing~|~05 - 4R Maintenance - Resurfacing~|~9565BF2F734312DF5219B5CA69AD767ABB8CCA2E 122487~|~1~|~1~|~01/S50~|~Roadway rehabilitation and associated improvements utilizing State Oil & Shale funds at 100% up to Program maximum.~|~04 - Reconstruction - No Added Capacity~|~611E029F0D3CBEE6BBB46D33A3346CBB19372101 112987~|~1~|~1~|~01/IMS~|~Culvert repair.~|~04 - Reconstruction - No Added Capacity~|~61E377F661564020C00AED7A75438EC7AFB46B6C 112987~|~1~|~2~|~02/NHS~|~Culvert repair.~|~04 - Reconstruction - No Added Capacity~|~CEB79ADF14ACBAD42FF047BD59F279938FBBB93A 93923~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2016. Various routes and sections in D10. Funded 100% state.~|~21 - Safety~|~D00EF77F354E7A1AF265C90B16D9F093F5DDA3CA 123852~|~1~|~1~|~01/SAF~|~100% HSIP funding ($300,000.00 cap)~|~21 - Safety~|~1E191473B67341F266030973E4CED46FDA963D5D 118064~|~1~|~1~|~01/MPO~|~Plan Split for MPO STBG funded scope.~|~05 - 4R Maintenance - Resurfacing~|~5110516B90B6E7F4C51B1CF22921513CAC495512 96819~|~1~|~1~|~01/NHS~|~Priority System resurfacing of COL-30 from SLM 28.03 to SLM 31.31 including joint repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~D462C5A19A835A51D0D15BCC71D4C71B066245A9 114726~|~1~|~1~|~01/SAF~|~District-wide polyester pavement markers.~|~21 - Safety~|~D6442205A2D12FFA0903B83600F0A85B1DA157E0 122399~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~B5B9366E223B5B7FE71AED54BEE22DC51CB14C15 94672~|~1~|~1~|~01/STR~|~Replace culverts SFN 1201816 CLA 41 2675 (East Fork of Donnels Creek) & SFN 1201948 CLA 41 2918 (over Jackson Creek) deteriorated concrete box culverts, SFN 1201840 CLA 41 2693 (East Fork of Donnels Creek)twin corregated metal culverts.~|~13 - Bridge Rehabilitation~|~F9E7790EA52E40601CCF98E0FA1372F11CD14B75 81636~|~1~|~2~|~02/IMS~|~not BR Eligible: SFN 6702376 9.76 IR76 over new milford CR31. SFN 6702430 9.91 IR76 over norfolk southern RR. SFN 6702554 10.09 IR76 over hattrick rd CR110. SFN 6702589 11.13 under industry rd CR47. SFN 6702619 and SFN 6702627 IR76 11.25 L/R over barrell run. SFN 6702643 and SFN 6702708 WB/EB IR76 13.04 over SR14 17.46.~|~13 - Bridge Rehabilitation~|~8B4119E74ADC7D25784548906795C76411769721 81636~|~1~|~1~|~01/IMS~|~Resurfacing IR76 9.72-13.55~|~05 - 4R Maintenance - Resurfacing~|~D09960990CD707CFE868734436FF0F9663B325D0 98058~|~1~|~1~|~01/STR~|~Added for slide emergency A project~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7220823354E59EB5EA5E12EB720256F57431167E 110716~|~1~|~1~|~01/STR~|~Rebuild shoulders on SR 18 in Defiance County from the Defiance Urban Area boundary at Kepler Road at 28.93 to Harris Road at 31.06. Major rehab funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~04BF1B2A68B5107324E010ED20A3DA9E8A7E75DA 110716~|~1~|~2~|~02/NFA~|~Rebuild shoulders on SR 18 in Defiance County from Harris Road at 31.06 to the end of the project at the Henry County Line at 33.30. Major rehab funds. No federal funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3E194E220ECF2CD920EF96C90472CD273B78DB41 118868~|~1~|~1~|~01/S5K~|~SR 416 from SLM 12.98 to SLM 14.85~|~05 - 4R Maintenance - Resurfacing~|~15F7300478F3893581C850CB7377F53B6CA809E3 118868~|~1~|~2~|~02/STR~|~Resurfacing SR 416 from SLM 14.85 to SLM 14.99~|~05 - 4R Maintenance - Resurfacing~|~7D0B96D67641936E995130572B340D152E982783 111394~|~1~|~1~|~01/IMS~|~Bridge Plan split~|~13 - Bridge Rehabilitation~|~20B1E5728F822336F8578634FB6F143626AEAF06 105307~|~1~|~1~|~01/STR~|~Bridge rehab on rural route bridge.~|~13 - Bridge Rehabilitation~|~B024C96E877F83BEAA5AC211C8F258E085D63ED4 123198~|~1~|~1~|~01/NHS~|~Replace bridge deck~|~13 - Bridge Rehabilitation~|~ED197CD99A709988E3431958531886675F9746F6 117902~|~1~|~1~|~01/IMS~|~Phase 1 NEVI I70B~|~63 - Electric Vehicles & Charging Infrastructure~|~5E3F650042FB104EE93882400077B6FF62E2112D 12500~|~1~|~1~|~01/MPO~|~80/20 fed/local plan split for all work using federal MPO STP funds.~|~~|~90F9A44A5832CF6C7B25876F0B52ADAAFC0590D7 123803~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~516C43F94D58371A5E1AC32DE1B7233C8D01B988 123803~|~1~|~2~|~02/NFA~|~not of federal aid system plan split.~|~05 - 4R Maintenance - Resurfacing~|~9DC8D65B9A7D0AB5F0A5E615890092B737455F52 97901~|~1~|~1~|~01/NFP~|~Resurface parking lots at District Headquarters~|~44 - Other~|~BD225D64E7987C3F62F8720B665815A5373DE0C5 102783~|~1~|~1~|~01/NHS~|~This plan split is for work on NHS bridge.~|~13 - Bridge Rehabilitation~|~F8F7474496D6C928694AF87F2850AF061668CB3C 125929~|~1~|~1~|~01/SAF~|~Sign replacements in Butler County~|~21 - Safety~|~154F808453D7305FB2A89747E7306D175BB8BD08 119846~|~1~|~1~|~01/S>2~|~Pedestrian improvements along Sullivant Ave~|~28 - Facilities for Pedestrians & Bicycles~|~DC13CAE895AD2EF812D53AFEF8340A9EA58920A9 106018~|~1~|~1~|~01/NHS~|~Concrete deck overlay project. GAL 35 1768 (SFN 2701448). NHS route funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~383039CECBA952967B94EE1BB59001FA4EB1068A 116193~|~1~|~1~|~01/NFP~|~Construction Inspection~|~17 - Construction Engineering~|~EDAFCAAB92317102260B6209083CA7A5340EFD6C 95600~|~1~|~1~|~01/IMS~|~Priority System minor rehabilation of existing IR 70 pavement: including joint repair, asphalt resurfacing, replace median barrier, replace guardrail, replace lighting.~|~05 - 4R Maintenance - Resurfacing~|~8FB316175AD0928D4010027A0327CEF27EA19128 95600~|~1~|~2~|~02/IMS~|~Bridge repair by cleaning and painting steel beam bridges using system OZEU and for BEL-70-2000, SFN 072722, by replacing bearings, repairing expansion joints and repairing substructure.~|~13 - Bridge Rehabilitation~|~DD1845AC79EE890E6D71FAAA5D5B0B9F3C03D2D2 95600~|~1~|~3~|~03/IMS~|~Slide repair. ER Event OH15-01. DSR# BEL-013.~|~~|~5E802EA1922743C3B48F95E6221C47A1ACD973D6 113552~|~1~|~1~|~01/NFA~|~Created for J&C involvement,~|~44 - Other~|~91FB1B4E50D2BFC68101392808914987EE2E5DD8 111283~|~1~|~1~|~01/SAF~|~Adding through/ turn lanes and making signal improvements~|~21 - Safety~|~E7A9E924ED19711E4C96B54D09EE796446810B61 111283~|~1~|~2~|~02/NHS~|~100% Local Items~|~21 - Safety~|~6D65EBF55599BBCCFF97ADFA174A325B8F8E374F 124791~|~1~|~1~|~01/S50~|~First Street paving and bike path from Meigs Street to Cedar Point Drive.~|~05 - 4R Maintenance - Resurfacing~|~93A11257FFB20D8D826F1F1D9083C0362ADE1067 102421~|~1~|~1~|~01/NHS~|~Construct superstreets at the US-35 intersections with Factory and Orchard.~|~04 - Reconstruction - No Added Capacity~|~CC48A904F95BF37BBA12EF3ADC0F88C2337DD6E0 102421~|~1~|~2~|~02/NHS~|~Bridge to be widened for Design-Build Superstreets project. Substantial improvements to the existing condition are not expected.~|~13 - Bridge Rehabilitation~|~5C3CB4AA87E1208F40E5680677525BD0C1E3A55E 102421~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~B97256E8A3C507CEED91E5F7C7EDB5F868A833A5 117915~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-B BUT 29-51~|~63 - Electric Vehicles & Charging Infrastructure~|~8E998E25D611DAD4D48F91CB8149F6D69254CDFB 117915~|~1~|~2~|~02/IMS~|~NEVI Phase 1 I-75-E~|~~|~A9718990F5F73005CAE60B560C59B11CBC387822 113692~|~1~|~1~|~01/SAF~|~Install a westbound left turn lane at the intersection of US 33 and Townline-Kossuth Road including offset and full deceleration. Also install short, storage only left turn lane for eastbound approach.~|~21 - Safety~|~9BCF53E040215F6D64367B99C244E28B2022231D 107945~|~1~|~1~|~01/SAF~|~Pavement marking plan split~|~21 - Safety~|~6A18978A729B5FF0B867040C5988ACCDE9777016 103834~|~1~|~1~|~01/MPO~|~Construct Hike and Bike Trail in the City of Kent.~|~28 - Facilities for Pedestrians & Bicycles~|~F4718DBC3415C2E2B3C5DF0FF19846252C14EC02 75619~|~1~|~1~|~01/NHS~|~Remove structure(s) over abandon RR. HOC 33 11.07 L & R. SFN 3700607 (L) and SFN 3700631 (R).~|~10 - Bridge Replacement~|~196CB547345BBF9CBF9DBF3820738C4953B1DB08 75619~|~1~|~2~|~02/NHS~|~Remove structure(s) over abandon RR and replace with fill and new pavement on HOC 33 11.03-11.14 WB and HOC 33 11.06-11.17 EB. NHS route funded 80 federal/20 state.~|~01 - New Construction~|~A13AA1CAC6B85D29FC136E8A5B2EA0163BB72CDD 114228~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order.~|~~|~06A1D0E1959DFDA9C4EC5CC92593D616D401A8F5 100009~|~1~|~1~|~01/STR~|~Bridge Replacement HIG 62 18.18 (SFN 3601293)~|~10 - Bridge Replacement~|~DDD6DF511D446C9839747EED381734622443C921 93205~|~1~|~1~|~01/STR~|~Remove and replace existing deck overlay and refurbish bearings and repair top of backwalls on SFN 5504627 MIA 718 0257 over Stillwater River.~|~13 - Bridge Rehabilitation~|~B9DBC7E2055741FB3598617EB6039EFDA89A0E58 121491~|~1~|~1~|~01/NHS~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~F0B77AC9B4ED498BDC82A02EB320AC4B3E230C0C 121491~|~1~|~2~|~02/S>2~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~EF0EE060357D7174AAB4BEF2E7CEC14B13D16161 110673~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~6BD7FF1F363C7BD72E085522330152E4C32FFF5F 110673~|~1~|~1~|~01/S5K~|~Resurfacing.~|~~|~3DCE834DFE2744FA64E376E46F8572288C4E7B49 110673~|~1~|~3~|~03/STR~|~Bridge preventive maintenance.~|~~|~536C55840A0B86F796738EF4D036DA60B4B81274 101667~|~1~|~1~|~01/S<2/CAMB~|~"01/S<2/PV/CAMB" City of Cambridge approved Small City funding with a federal max of $3,547.025.69 at 95% funding for the reconstruction of Clark Street.~|~04 - Reconstruction - No Added Capacity~|~295CCC10CEA1AC8C4CD4F757E05EB048733BDA44 97977~|~1~|~1~|~01/STR~|~D09 GR FY20~|~05 - 4R Maintenance - Resurfacing~|~FF41D642674C332006DA75AA886F59CB7FC504F6 117979~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~79F8E28D22BF60F8E5AC7D544F1C2716B1ABBC41 126267~|~1~|~1~|~01/IMS~|~Bridge preventive maintenance~|~47 - Bridge Preventive Maintenance~|~E0E57FDC1F2E0EF83E38A61F41DDFE9E30AEBBA3 114295~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8.~|~21 - Safety~|~65E695E41F7A61BD098A15C50F62A8EFDD47849B 96116~|~1~|~1~|~01/NFP~|~Material Storage Shed~|~44 - Other~|~0A4FF7D435DC31FE700CF643CB48BDDE11864AA1 91548~|~1~|~1~|~01/IMS~|~The project involves the replacement of the deck on Bridge BEL-70-0865 (SFN 0702196). The structural steel is to be painted or replaced and the bridge will be raised without impacting the profile to any great extent.~|~13 - Bridge Rehabilitation~|~63C4BCF80754B91ECB9207880A15D4F6AAAE3E14 110573~|~1~|~1~|~01/STR~|~Culvert repair throughout the district.~|~~|~F27F4E6992760DC61E1B23CA40FD4100C99DADC3 84079~|~1~|~1~|~01/NFA~|~Resurface SAN SR523 0-3.79~|~05 - 4R Maintenance - Resurfacing~|~1A71747494B8C09FD24D653FDEAE4C7105179962 84079~|~1~|~2~|~02/NFA~|~Relocate ditch away from edge of pavement.~|~05 - 4R Maintenance - Resurfacing~|~84EA4C39580905920ACEE34D7A67E2CAE63AF2EF 88300~|~1~|~1~|~01/SAE~|~Shared use path along Feedwire Road, signal upgrade at Upper Bellbrook/Feedwire intersection, crosswalk improvements at the Middle School drive.~|~21 - Safety~|~4D06FE9CFD87D5F4BC430EFD8793CC185E44797F 119145~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on ATH 681 0.00-7.24 and ATH 124 0.90-4.49.~|~05 - 4R Maintenance - Resurfacing~|~678B256BEF2173DD47EF7F00B3A55DD0D1997710 107261~|~1~|~1~|~01/MPO~|~Resurfacing Medina County Line Road between Eastern Road and Greenwich road in the City of Norton.~|~05 - 4R Maintenance - Resurfacing~|~2F05D7E3E1A7C6DD0142F50440802E722F3E498B 124819~|~1~|~1~|~01/IMS~|~Construct noise wall on north side of IR 70~|~20 - Environmental Only~|~A42A0410F03175B50FC215DA6D9B33C7A6B427CF 112785~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~3E05FD6EF7A8C9D5F776ECAB4561AA8B101C731C 112785~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~2205F4E98D34A642D187BCEC59761C4ED7FD6F83 88405~|~1~|~1~|~01/STR/FCEO~|~"01/STR/OT/FCEO" - Safety Program Funding 4RS7 (90% Federal) / LNTP (10% Local Match) - No CAP - Fairfield County Safety Project to relocate a portion of CR71.~|~21 - Safety~|~B2D4D59F89F64CC52676BE9817E86826A8C57A85 106450~|~1~|~1~|~01/NFA~|~The City will construct improvements to Pershing Ave from the Southern Ohio Veterans Memorial Highway project limits for an estimated 968 linear feet to the Rocla Ties entrance, widen to 21 linear feet~|~01 - New Construction~|~31EAD917BF2C440ABD104E95379E9545D90D6D4B 91343~|~1~|~1~|~01/STR~|~General system resurfacing of SR-361 from US-23 to SR-159~|~05 - 4R Maintenance - Resurfacing~|~E92C5E21888A6124A67BDC9384C5DE5C7FF53FF4 116920~|~1~|~1~|~01/STR~|~Bridge overlay w/waterproofing~|~13 - Bridge Rehabilitation~|~BA3054951ECF6BD1D0D40845819EBDD073C8FEBA 122428~|~1~|~1~|~01/ERD~|~Plan Split for RAISE eligible Scope~|~28 - Facilities for Pedestrians & Bicycles~|~7437F4C3DA256F3B80A7EB73FDA53CC80F000D51 122428~|~1~|~2~|~02/NFP~|~Plan split for 100% locally funded scope~|~44 - Other~|~B95D8943814208383A7EB7898280560A0030B528 119237~|~1~|~1~|~01/NFA~|~ATH-TR315-0.01 Bridge Replacement (SFN: 0540919)~|~10 - Bridge Replacement~|~58576906C7109F3E6892791DCEAEA3DFE3C81B9B 84559~|~1~|~1~|~01/BRF~|~Elegible bridge SFN 0432962 Johnson Road Bridge over the Grand River~|~10 - Bridge Replacement~|~C586953384579B45EAF5B12F4DEC197AF873BAC2 125391~|~1~|~1~|~01/STR~|~Resurfacing and related work on SR 204 in Perry County.~|~05 - 4R Maintenance - Resurfacing~|~DC36C8B131D62AD40DDBE9D376E85BBB2E26E3EC 96188~|~1~|~1~|~01/NFP~|~Construct a cold storage building in the Riveredge Garage in Cuyahoga county.~|~~|~8BED96F4BBB07D8CEC73A02E23063DD481303A70 23733~|~1~|~1~|~01/SAE~|~100% State Amish Buggy Safety funding~|~~|~4E425003AA4FA97C6DCC8946268930B650DCBF35 121523~|~1~|~1~|~01/SAF~|~Polyester Pavement Markers~|~21 - Safety~|~548593CDB43467ADA17C80D6A0F44A1584F2EA5A 97898~|~1~|~1~|~01/S>2~|~CR 192 (OC 759) - construction of a roundabout at the intersection of Garbry Road and Looney Road.~|~44 - Other~|~7277AD41EC15D8E7CC53398B873B715D1C2E3C53 76466~|~1~|~2~|~02/S<2~|~STP D6 funding for US-36 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~09010C2DF38D9D64841F1059BA60C2B0EC4AC910 76466~|~1~|~1~|~01/NHS~|~NHS D6 funding for US-33 roadway work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~413CA0090446823199C2588990364A2697C3E8B1 76466~|~1~|~3~|~03/NHS~|~NHS D6 funding for 17 bridges on US-338000786 UNI US33 8.79 Intersect: Over Nw Parkway (C-133)8000816 UNI US33 8.79 Intersect: Over Nw Parkway (C-133)8000840 UNI US33 9.05 Intersect: Over Csx Rr8000875 UNI US33 9.05 Intersect: Over Csx Rr8000905 UNI US33 9.12 Intersect: Over Cr 1918000964 UNI US33 9.12 Intersect: Over Cr 1918000999 UNI US33 9.22 Intersect: Mill Cr8001022 UNI US33 9.22 Intersect: Mill Cr8001057 UNI CR114 11.5 Intersect: Over Cr 1148001081 UNI CR114 11.5 Intersect: Over Cr 1148001111 UNI US33 11.56 Intersect: Mill Creek8001146 UNI US33 11.56 Intersect: Mill Creek8001170 UNI US33 12.19 Intersect: Over Us368001200 UNI US33 12.19 Intersect: Over Us368001219 UNI US33 8.34 Intersect: US-35/4 Ramp8001227 UNI US33 8.35 Intersect: US-35/4 Ramp8001243 UNI US33 12.43A Intersect: Ramp over SR-245~|~13 - Bridge Rehabilitation~|~7AAB2929EA6F5C1B51FD2FDDF01060DDE798C2A9 76466~|~1~|~4~|~04/BRO~|~BR funding for SFN 8001251, UNI-33-8.79 Ramp bridge over C-133/W 5th Street~|~13 - Bridge Rehabilitation~|~988F94F8EB90C1868B7CC73D388A6B78726BF0AF 91605~|~1~|~1~|~01/IMS~|~Funding split for all resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~243FAB792196690C2935CEB49E4E728A2628A372 96884~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~E15E7BA12AE4550BDE8E3FCDBD3DD29A851C8D96 112651~|~1~|~1~|~01/IMS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work.~|~13 - Bridge Rehabilitation~|~6CEA2CC6836FF4E21BE602B7A89FE9AF2A3BD8BA 95675~|~1~|~1~|~01/NHS~|~For all work on SR-25 legs of the intersection.~|~21 - Safety~|~B9963BE4BBA364E14DC287FFC3775E6DE9C1CEDF 95675~|~1~|~2~|~02/S>2~|~For all work on Gypsy Lane legs of the intersection of SR-25 and Gypsy Lane~|~21 - Safety~|~8FE72413B044779D1065F920303D0B6A5BA13B07 95675~|~1~|~3~|~03/S>2~|~Plan split for 100% city funded items~|~21 - Safety~|~8AAC0E2E8A9902EE2B0D9119F038B37183C09C6C 94206~|~1~|~2~|~02/BRO~|~Work to repair two bridges on Interstate 75 in Allen County. Federal and state funds from the District Preservation Program budget.~|~13 - Bridge Rehabilitation~|~F61A4AC24E5AA4EEA838633434A22355CBF2286B 94206~|~1~|~1~|~01/IMS~|~All the resurfacing work in this project. District Preservation 4PF7 (90% federal) / 4PS7 (10% state) - No Cap - all work on the interstate system.~|~05 - 4R Maintenance - Resurfacing~|~ECF3D86AABF51A60B9D27D4D2688B971A5BCF5EE 102768~|~1~|~1~|~01/NHS~|~Bridge Replacement: WAY-250-17.27 (SFN 8504776)~|~10 - Bridge Replacement~|~815559D1D133452C9A024117E669C72F811A0B69 125513~|~1~|~1~|~01/STR~|~bridge replacement.~|~10 - Bridge Replacement~|~87B1357DF2E06AB4E7BCBF963777E0C1B1704329 104476~|~1~|~1~|~01/MPO~|~plan split~|~28 - Facilities for Pedestrians & Bicycles~|~2BD992EC9BAC61A09BDA215CAA79D17813FB54F5 84522~|~1~|~3~|~03/NFA~|~Two-Lane resurfacing project using a chip-seal treatment. MOE 724 0.00-1.30, NOB 260 8.86-14.35, NOB 724 0.00-2.75. Not on the federal aid system funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~BABF1EAC429F0414EC09AFEB9D565DC366541F43 84522~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using a chip-seal treatment. MOE 145 8.78-17.87, MRG 83 10.33-15.60, NOB 83 0.00-6.77, WAS 555 1.25-7.66. Rural other federal aid funded 80% Federal and 20% State.~|~05 - 4R Maintenance - Resurfacing~|~9AAD9805209C05533BD2B70DE24980FD0A888D4E 84522~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using a chip-seal treatment. WAS 555 0.03-1.25. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~BB71424A8703C6D0DD96AE64CC40D70A322CEB8B 111273~|~1~|~1~|~01/NFA~|~ODNR Shawnee State Forest~|~05 - 4R Maintenance - Resurfacing~|~66EA97C0AE0DC4F3B297992A6571AC913F68BEE3 110592~|~1~|~1~|~01/BRO~|~All the work to replace the bridge. District federal and state funds.~|~10 - Bridge Replacement~|~023006961498E784162DB7FA9FB0C90415C9B779 115527~|~1~|~1~|~01/NHS~|~Rehabilitation of bridge~|~13 - Bridge Rehabilitation~|~E692E657793AA84C55F0D6C7D7096B41D6E286DF 93697~|~1~|~1~|~01/S>2~|~80/20 funding split between the federal MPO STP funds and local funding for project eligible work.~|~05 - 4R Maintenance - Resurfacing~|~37094313A53885F31FFF3EDE8A06FCF2BD0DDCB2 116917~|~1~|~2~|~02/MPO/GREE~|~Widening of S Arlington Rd.~|~03 - Reconstruction - Added Capacity~|~503EFA5D27247F7019B723E132D9865D1E05F6AF 116917~|~1~|~3~|~03/MPO/GREE~|~Reconstruction of S Arlington Rd.~|~04 - Reconstruction - No Added Capacity~|~0BEABADA7114549CE054EC07B05BD8A76D03B36B 116917~|~1~|~1~|~01/CMQ/GREE~|~Construction of roundabouts at Boettler Rd and Southwood Dr.~|~04 - Reconstruction - No Added Capacity~|~0DE8DC36678386C0B80236D1C0DBAF4812F329C6 123567~|~1~|~1~|~01/SAF~|~Replacing signals with ROW. Locations TBD~|~21 - Safety~|~5D9077C4AEE9C435B832FA16B9845AB5882109CE 92844~|~1~|~1~|~01/STR~|~Bridge Replacement~|~~|~A08BC2A5FF4DD15284C651E3D3BF301CEA6F3A71 100900~|~1~|~1~|~01/STR~|~Chip sealHIG 73 15.34-23.48~|~05 - 4R Maintenance - Resurfacing~|~D6EF6D2904EAF1857BBB921995251E5012C1471A 95813~|~1~|~2~|~02/NFP~|~SR-120 from SLM 14.99 to SLM 17.03 other work (pavement repairs, curbs,...) not eligible for urban paving funding.~|~05 - 4R Maintenance - Resurfacing~|~14AA9EE04A0BD80B9184EB7C60570EA8B4813632 95813~|~1~|~1~|~01/S>2~|~SR-120 from SLM 14.99 to 17.03 urban Paving. from face of curb to face of curb up to 3" deep.~|~05 - 4R Maintenance - Resurfacing~|~FF202DE52E8B0B45C9681341646787FF18946808 97766~|~1~|~1~|~01/NHS~|~Plan split for NHS bridge.~|~13 - Bridge Rehabilitation~|~3D05D53DA896B80D64BEED518A00A83EF0D9102B 97766~|~1~|~2~|~02/STR~|~Bridge maintenance on rural bridge.~|~13 - Bridge Rehabilitation~|~2E3986E710A99D65D40F661DFFBC6C0CF1040A0C 115815~|~1~|~1~|~01/IMS~|~This plan split covers all work associated with installing the micro-duct pathway on the project~|~44 - Other~|~B424A4270D9C344FC483D99FA6F1C04405B1F705 108333~|~1~|~1~|~01/S<2~|~OH18-01 ER Event. Landslide repair project. MOE 536 2.26, DSR MOE-019. Urban other federal aid funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9413078046C35A5323A8982F1D629C1F080003CD 124929~|~1~|~1~|~01/NFP~|~Primary split for OPRA funds~|~44 - Other~|~66770A8DEFF183E18AE19244DAB4FC78D1DC8EF4 118968~|~1~|~1~|~01/MPO~|~Plan split for path construction.~|~28 - Facilities for Pedestrians & Bicycles~|~FF627847B8DB9EECC721EA2F31FED3FC4783E324 118968~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~28 - Facilities for Pedestrians & Bicycles~|~4AC13C03E1FC3FAC1812EE9F246A255E9E370589 86205~|~1~|~1~|~01/ENH/Shad~|~Shadyside on Central Ave from 37th to 40th, perform a streetscape enhancement project on Central Avenue to include new sidewalks, integral curbs/curb inlets/catch basins, brick paved crosswalks, ornamental lighting, landscaping, furnishings and signing. The conflicting utilities will be relocated by the utility companies prior to construction. Enhancement funds.~|~31 - Landscaping & Other Scenic Beautification~|~BBFB084734A4D78ED10FFAA670D122076A1CBDF9 86205~|~1~|~2~|~02/MPO/Shad~|~Shadyside on Central Ave from 37th to 40th, perform a streetscape enhancement project on Central Avenue to include new sidewalks, integral curbs/curb inlets/catch basins, brick paved crosswalks, ornamental lighting, landscaping, furnishings and signing. The conflicting utilities will be relocated by the utility companies prior to construction. MPO funds.~|~31 - Landscaping & Other Scenic Beautification~|~F748C985E8992129B2D8AFF72A8AA71120576775 115004~|~1~|~1~|~01/MPO/FAIR~|~Resurfacing Broad Street, reduce travel lanes from 4 to 3 to provide bike lanes, widen existing sidewalks, perform access management improvements.~|~05 - 4R Maintenance - Resurfacing~|~AE2DD1FCC3D702ACEFC6079747124FC325535A88 115004~|~1~|~2~|~02/NFP~|~100% locally funded work on city water utilities~|~43 - Utilities~|~8AC3FF17443D5878968CE8A85D53A464927EC845 125372~|~1~|~1~|~01/S5K~|~Reactive maintenance, spot paving.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F0BB99303D5F89D5F3FD78F7379C3C6240736E99 126280~|~1~|~1~|~01/STR~|~Bridge rehabilitation project. VIN CR 17 3.00, SFN 8231249.~|~13 - Bridge Rehabilitation~|~9B4D16F351EDBDD1A1104A80918AC52F16445486 108093~|~1~|~1~|~01/NHS~|~Culvert rehab on rural route.~|~~|~2FB6C45170A98C1BC7A19C6667E54DE8F1E77E69 110539~|~1~|~2~|~02/IMS~|~This plan split includes all bridge work on the interstate mainline bridges for minor rehabilitations including sealing, expansion joint repairs, patching, and structural steel repairs.~|~13 - Bridge Rehabilitation~|~B6D3B4A18F1BF57A1E2761A4408FA9AC8D40396F 110539~|~1~|~1~|~01/IMS~|~Resurfacing and pavement repairs on HAM-74~|~05 - 4R Maintenance - Resurfacing~|~24A3550009A17566D9E13E9ECAB0C11D3301CCE5 112905~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-203~|~05 - 4R Maintenance - Resurfacing~|~5D896632800623E54957443210FD891CEEEEFCC7 90836~|~1~|~1~|~01/MPO~|~Installation of new 5' sidewalk; replacement of existing asphalt driveways with concrete aprons with continuous sidewalks through the apron; construction of retaining walls where needed by adjacent grade; installation of trees and other landscaping on the South side of Central Avenue (SR 725) between 12th ST. and Heincke Road.~|~31 - Landscaping & Other Scenic Beautification~|~23ACBBF9F3A249A9B99FC9E4F2F06F97C9D0A85C 110687~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~3574DF5B2E52A16C7DEED1E847254288538E99AC 110687~|~1~|~2~|~02/S<2~|~construction Inspection~|~17 - Construction Engineering~|~C291540CC3252CDBC6C53F37DDC80525D4498C66 110687~|~3~|~3~|~03/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~573BE7FAD95430144BE7585F8C02F9750D80A1A0 98106~|~1~|~1~|~01/STR~|~Spot Paving various locations in District 11.~|~05 - 4R Maintenance - Resurfacing~|~7C49C1C026EFC664180F108C10D0A33F65680532 118995~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~C0B0DD1038669FC1C2DE472691E95E71E01FB2A4 118714~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 6.61-19-746.~|~05 - 4R Maintenance - Resurfacing~|~E545B5FBE93AA0F2DB7E3EBED864365D85FDAD07 118714~|~1~|~2~|~02/S5K~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 19.746-20.23.~|~05 - 4R Maintenance - Resurfacing~|~D9B36738EDFF992BB2F1B9B8F3F9D7B8029F9061 109354~|~1~|~1~|~01/SAF~|~Install sidewalk and ADA ramps on the west side of US-42 between Cincinnati and Reading (approx. 1500 ft).~|~28 - Facilities for Pedestrians & Bicycles~|~1F75E7BB9200E99F111E47B5DEBC384B77E42728 109354~|~1~|~2~|~02/SAF~|~Connect a 500? piece of sidewalk on the east side of US-42 in City of Reading.~|~28 - Facilities for Pedestrians & Bicycles~|~83E80C00BD962C9913B987DE7CD9EA002C721509 119668~|~1~|~1~|~01/NFP~|~Culvert Replacements and field paving.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1AC720A78BC3C7639DC433DC700756637C414488 91374~|~1~|~1~|~01/SAF~|~Belpre City Schools improvement project using SRTS funding for new side walk construction. 100% Federal.~|~21 - Safety~|~4239D6D8C5CD9EB8106C69BB69C6A8BBD2BAB9A3 111010~|~1~|~1~|~01/SAF~|~Intersection improvement at STA SR 172 and Perry Drive by adding WB and NB Right Turn Lanes.~|~21 - Safety~|~452A60A39F5FC03FD6307EE41805B9E31400237A 111010~|~1~|~2~|~02/S>2/CANT~|~Replacement of waterline along SR 172 from Perry Dr to Saratoga Ave NW and Perry Dr from 12th St SW to SR 172 in the City of Canton.~|~43 - Utilities~|~6D17A6B71418F5F95E3143DB08DA59887FCFB3FE 111010~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~8980D2C20EBCF48A481C15D7EDE3B0A60B22114C 96061~|~1~|~1~|~01/NFP~|~"01/NFA/OT/ " Plan Split for Construction of a wash bay at the existing Knox COunty Garage.~|~~|~579B78A6F1E4BDFC3F35E9C57133F8E4B29B2A75 116313~|~1~|~1~|~01/NFP~|~Plan split for repairing GR in D6 in all counties, besides Franklin.~|~44 - Other~|~CE6182FF5222CFA2FF93FB6164CC1CC77ED140A0 100288~|~1~|~1~|~01/MPO~|~Modify, improve and enhance the Pearl Road roadway using MPO TA funding.~|~31 - Landscaping & Other Scenic Beautification~|~BD7E0F8B07EF3FE87B65A58E21D39F60ADF325BD 103431~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4.~|~44 - Other~|~AAD2B8D44C9794342E6C09832AE1D68032C3165F 88563~|~1~|~1~|~01/IMS~|~Resurface (smoothseal) LUC IR75 7.82-11.86; LUC-475 from 14.50 to 16.42~|~05 - 4R Maintenance - Resurfacing~|~2B1FA3F2FBE7E41F53A57E0CE5D8B8E190A41779 88563~|~1~|~2~|~02/IMS~|~Bridge Plan Split~|~13 - Bridge Rehabilitation~|~8C105E311E1784235A55F92E2C39E1DFA2C4D406 88563~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~0705D33E460D0E6BD6540586208DE432FF21532D 92970~|~1~|~2~|~02/STR~|~"02/STR/OT/ " - District Preservation Marking Pavements 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on Kno-US 62-00.00 to 22.65~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~238F7A265A24B455B214BD7490310BD67B017396 92970~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Kno-US 62-00.00 to 22.65~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E468F06F475D080858043D5A26FCA68668953032 92593~|~1~|~1~|~01/NFA~|~Belmount County TID~|~01 - New Construction~|~DA0349942A8B6FA55775F0CF01DE106B6F014E85 118356~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at MED-3-20.63/SR-94/SR-606~|~21 - Safety~|~BC553882B6F0FDDBE2633FE810A5894464CC8AF7 89447~|~1~|~1~|~01/STR~|~District RPM project.~|~44 - Other~|~E4C3A920B0CDF6AB9750FC83409D8901CC84DB4B 116031~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP/OT/ " - 4PS7 (100%) ~|~17 - Construction Engineering~|~60061A3E3DFA36F03A00DB6236BAD53172827063 115662~|~1~|~1~|~01/SAF~|~Guardrail project utilizing CEAO HSIP (4HB7) funds at 100%.~|~21 - Safety~|~8D95BDF471930F78809C72A874F39236D53DD8EA 105212~|~1~|~1~|~01/S>2/AURO~|~Resurfacing, urban paving in the City of Aurora.~|~05 - 4R Maintenance - Resurfacing~|~06F2555CCC89690D3689678EBA572081EB0F258C 105212~|~1~|~3~|~03/S>2~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~B2752A715ECA3BF4E95D4E3D8BF8761F6D0E03C9 105212~|~1~|~2~|~02/S>2/AURO~|~Full and partial depth repairs.~|~04 - Reconstruction - No Added Capacity~|~241E5434564ABDFD5FE7D978CDCBC6D2FE45D1B7 91150~|~1~|~1~|~01/IMS~|~FRA-270: 24.47-26.42 pavement resurfacing~|~05 - 4R Maintenance - Resurfacing~|~7A5DE344E81400AA05B9B1255AD7ECE70DF2AD69 95876~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - Geological Site Management Funding 4SF7(90% Federal) / 4SS7(10% State) - CAP = $350,000.00 Program dollars for Construction and Inspection - Stabilization of the rock foreslope above MUS IR 70 01.76-01.81~|~21 - Safety~|~F8FBD5F9666D5E843C1D086324123F5CC97A1976 91053~|~1~|~2~|~02/S<2~|~D6 federal/state funding for STP route in Marysville:UNI-36: 13.86-13.99~|~05 - 4R Maintenance - Resurfacing~|~3C0E55BE9EE184B4473D2D2788846BB709391ACB 91053~|~1~|~4~|~04/NHS/Mary~|~Urban Paving - D6 federal and Marysville funding for NHS portion within City of Marysville:UNI-36: 6.94-7.68~|~05 - 4R Maintenance - Resurfacing~|~4A0ABBCD4F158FCEF6EDFEED444154884D4E3A90 91053~|~1~|~1~|~01/STR~|~D6 federal/state funding for STP Rural portion:UNI-36: 0-1.74UNI-36: 13.99-18.89~|~05 - 4R Maintenance - Resurfacing~|~B2D0FE8C43D969AA374D64CB2197BEFFE9A17004 91053~|~1~|~6~|~06/STR~|~bridge work on UNI-36-0.89 (SFN 8001634)~|~13 - Bridge Rehabilitation~|~62C7C58B3E24EC2CBBF9BFBD2CE8B65434AAD4CA 91053~|~1~|~3~|~03/NHS~|~D6 fed/state funding for NHS portion:UNI-4: 0-2.57UNI-36: 1.74-6.94 & 7.68-8.74~|~05 - 4R Maintenance - Resurfacing~|~D6078B1F088F6F59AE1C5D6042ADE25059343F4A 91053~|~1~|~5~|~05/NHS/MILF~|~100% Village of Milford Center for catch basins and curb replaced~|~05 - 4R Maintenance - Resurfacing~|~F0321FD20834FA7EB51977C7774030C4AE6BDF60 91053~|~2~|~8~|~08/NHS~|~Part 2-add turn lanes at Collins Rd~|~04 - Reconstruction - No Added Capacity~|~ACE4D4A44AE148924A9D3DA7A5467A7D6493D9CD 91053~|~1~|~7~|~07/NHS~|~Bridge work on five bridges~|~13 - Bridge Rehabilitation~|~34FCBE0450396982B8D6407258494BD7FEC1B197 107060~|~1~|~3~|~03/NHS~|~NHS plan split for Ott-2-10.34 to 14.87~|~05 - 4R Maintenance - Resurfacing~|~931A663A7FAFF1798B07C2DE7FB1D492C5EA2A75 107060~|~1~|~1~|~01/S<2~|~Plan Split for Full depth shoulder repair in Urban sections > 200,000; Tiffin, Fremont and Pt. Clinton urbanized areas~|~05 - 4R Maintenance - Resurfacing~|~88F02F6A33EA811771A1DB448060BDADB6EB9628 107060~|~1~|~2~|~02/STR~|~Plan Split for full depth shoulder repairs areas in rural sections~|~05 - 4R Maintenance - Resurfacing~|~B5D9E9DC4D4260CA5752D5CEE38316FFE93F54D3 107060~|~1~|~4~|~04/S>2~|~Plans split for full depth shoulder repair sections in the Toledo urban area~|~05 - 4R Maintenance - Resurfacing~|~FEAD6E9C7F1CD833C5E9DAF105300B5B5ECF30BB 116615~|~1~|~1~|~01/NHS~|~NHS plan split for resurfacing and resurfacing related items on SR-315.~|~05 - 4R Maintenance - Resurfacing~|~FAD1A7223349F0533FA3805F8DAD9D3F42CEF2B1 111566~|~1~|~1~|~01/MPO~|~Plan split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~344FD5DB996E01672F3FEABCF73ED09661B2096D 111566~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~27D9F6188C0CD74A66A1CE47A7B376338EF9AA7C 86863~|~1~|~1~|~01/NHS~|~Intersection improvement project at Pike/Green/7th Street. Includes Safety, MPO and Local funding. 90% Federal Safety and 10% State Safety funds.~|~21 - Safety~|~75A331D065253DD6498D2C1D16FBECD38B2E5CC4 111381~|~1~|~3~|~03/NHS~|~All items of work associated with the rehab and/or replacement of existing culverts within the existing roadway footprint.~|~04 - Reconstruction - No Added Capacity~|~E096E699829E2E585B2DF1A62B9FA43E3AAAF5EA 111381~|~1~|~1~|~01/NHS~|~Major General Plan Split - all items associated with the replacement of the existing footprint (excluding drainage work)~|~05 - 4R Maintenance - Resurfacing~|~C91056A1CC4E2B191B3DF37C29506B76A6BFD538 111381~|~1~|~2~|~02/NHS~|~Safety plan split - all items associated with widening roadway including culvert extension and work at Jerome Rd~|~04 - Reconstruction - No Added Capacity~|~AF6709965627EA7E009D3862FA6DB69C4987CCFA 96058~|~1~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 3004775 GUE SR265 8.61 Intersect: SR 265 Over Ditch; Not BR Eligible for Replacement or Rehabilitation: Length=18 SD/FO(0) SR=11.5 DSR=5~|~~|~2BCCC86A994E542E67E8FBA71849A509AB1D81DB 96058~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Replacement of 3004805 GUE SR265 9.45 Intersect: Over Br Leatherwood Creek: BR Eligible Length = 20' SD/FO(1) SFR=11.5 DSR=4;~|~~|~6A2F1391BF0A869EF0A464CA0DA758B615207CD2 108455~|~1~|~1~|~01/IMS~|~Construction of noise barrier on the west side of IR-77~|~~|~D4902DAED928C0CA3DF46ACF9B33AE2B01FEF729 109811~|~1~|~1~|~01/SAE~|~Application of edgeline and centerline pavement markings on various county roads in Clinton County.~|~21 - Safety~|~02B77EA63E709B2ABF45B1C0285AA50206C1C1E2 116339~|~1~|~1~|~01/STR~|~plan split for the rural sections~|~05 - 4R Maintenance - Resurfacing~|~3E929411793E0D8BBDF30662A1085DEF175F79DD 116339~|~1~|~2~|~02/NHS~|~plan split for the NHS portion of CLI-73~|~05 - 4R Maintenance - Resurfacing~|~1B64125C1E2AC646EB0CEB845CAFC052B0647942 116339~|~1~|~3~|~03/S5K~|~Plan split for the Small urban section ~|~05 - 4R Maintenance - Resurfacing~|~3775C477FC2B9859F1CA1B7CBA6B98A326CE6DC0 106537~|~1~|~1~|~01/S>2/YOUN~|~Resurfacing, urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~A163B3362DC6473AE7D7B3128A3B6C3ECBF9F1BB 106537~|~1~|~2~|~02/S>2/YOUN~|~Curb ramps and full and partial depth pavement repairs in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~C3E932CFD1A267C332F74C34A2156C16CA172C99 106537~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~11B4172F5B829DE759D0657EF3634313B5CD3530 125672~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~912F1E4B96B9E0E2C29BDEA195764BD98CCEE858 93530~|~1~|~1~|~01/SAE~|~Sidewalks along Clough Pike, and at Summerside and Glen Este Middle School.~|~28 - Facilities for Pedestrians & Bicycles~|~B5FC9915AA8F84BAB2DB858C65372AC66ED33CA8 98053~|~1~|~1~|~01/IMS~|~for various bridges.~|~13 - Bridge Rehabilitation~|~8A0E1331FF70055E69C140446F2FDDC52258B242 110091~|~1~|~1~|~01/NHS~|~MAR 23 from 9.74 to 19.97~|~05 - 4R Maintenance - Resurfacing~|~EC16A99F50BD1416FFD215A9A5D5FDFF71A63441 110091~|~1~|~2~|~02/NHS~|~Twin Structures: MAR-23-10.06 & MAR-23-10.07, SFN: 5100690 & SFN: 5100666~|~13 - Bridge Rehabilitation~|~CAC99A8106E9F8D64EE432BEA2E8542245719AEB 97572~|~1~|~1~|~01/S<2/KCEO~|~"01/S<2/PV/KCEO" - CEAO Funding 4B77 (Federal-80%) / LNTP (Local-20%) - Project CAP 4B77 $1,300,000 - Resurfacing of Knox County Road 7 00.00 to 01.25 (Major Collector Urban)~|~05 - 4R Maintenance - Resurfacing~|~4A069920A2966B26270D6E5CF4BD632352881970 97572~|~1~|~2~|~02/STR/KCEO~|~"02/STR/PV/KCEO" - CEAO Funding 4B77 (Federal-80%) / LNTP (Local-20%) - Project CAP 4B77 $1,300,000 - Resurfacing of Knox County Road 31 00.00 to 01.92 (Major Collector Rural)~|~05 - 4R Maintenance - Resurfacing~|~DDE45203E87781F19F9A73D5FCAEF4E9373D8577 96667~|~1~|~1~|~01/NHS~|~TRU SR 5 from 15.32 to 18.13~|~~|~FF2BEF452DDF1E175C1A166FBA5A7CBEE2FF6CE5 96667~|~1~|~2~|~02/S>2~|~TRU SR 7 from 5.61 to 8.41TRU SR 46 from 7.85 to 12.72 and 12.82 to 13.00 and 13.04 to 13.39~|~~|~F5F0D363774CE4AC8B86FDDEA80D6DAEA7DE2A10 96667~|~1~|~3~|~03/S<2~|~ATB SR 534 from 19.34 to 20.35~|~~|~50B94519A4A65E3907BA36E54BA102E643C9073A 96667~|~1~|~4~|~04/STR~|~ATB SR 46 from 19.74 to 20.16ATB SR 307 from 3.87 to 7.82 and 8.49 to 12.78TRU SR 45 from 16.69 to 18.30~|~~|~6D34B4378EAE821E20722CA52734FB987A0B2A41 118358~|~1~|~1~|~01/NFP~|~plan split.~|~10 - Bridge Replacement~|~7799FBD0B801F98D0B44043915F44835AA29096D 110807~|~1~|~1~|~01/BRO~|~Replace the existing slab bridge~|~13 - Bridge Rehabilitation~|~FDD5B01BE7F2424D23C6E8079077994B53F80D12 99541~|~1~|~1~|~01/IMS~|~Resurfacing work to be funded at 90/10 fed/state~|~05 - 4R Maintenance - Resurfacing~|~E78E15A0D354198E8C60CCF6CD77E84C7E9572D1 113800~|~1~|~1~|~01/BRF~|~Bridge replacement. Fed/State exchange project.~|~10 - Bridge Replacement~|~5B0A6586FE77199968672DB2AE09E3058BB13311 101198~|~1~|~2~|~02/NHS~|~NHS for Fine Graded Polymer AC Overlay on the following section: FAY-22-6.26-7.25~|~05 - 4R Maintenance - Resurfacing~|~4AEF60E88BD3FF025FBDAA6570DB5589E917BB55 101198~|~1~|~3~|~03/S<2~|~STP <200,000 for Fine Graded Polymer AC Overlay for the following sections: FAY-62-10.78-11.73~|~05 - 4R Maintenance - Resurfacing~|~F7D62B9E2A7808B11717628683FBD096EE6567F8 101198~|~1~|~1~|~01/STR~|~STP Rural for Fine Graded Polymer AC Overlay on the following sections: FAY-22-0.00-6.26; FAY-62-0.00-10.78~|~05 - 4R Maintenance - Resurfacing~|~A611C3152E14FFA449BD264B22A2581B8452FE9E 101198~|~1~|~5~|~05/STR~|~Work on structure FAY-62-9.06 (2401290)~|~47 - Bridge Preventive Maintenance~|~B5434C2AC98B28190B9671F91BBDA241DA5FB10A 101198~|~1~|~4~|~04/S<2~|~Paving within Washington CH corp. US 62 11.73 to 11.88~|~05 - 4R Maintenance - Resurfacing~|~88094E5441E9303A48BAFE9DACB1C6FAAFF2B61B 105720~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~4EAABA13BB19E306BA3D7DFD98DB427995A86F69 101191~|~1~|~1~|~01/BRO~|~District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~FC9526024936A6D561E75281AD70CB6D2B4964DD 96533~|~1~|~3~|~03/NHS~|~Plan Split for NHS route: BUT-27~|~99 - State Preventative Maintenance~|~401061587E9B9AE7C27BBDBCDADEE714EF5DBF9B 96533~|~1~|~1~|~01/S<2~|~PLan Split for the Sm Urban portions of the project. This includes BUT-732 from SLM 9.85-10.45~|~99 - State Preventative Maintenance~|~AC3DE50423B22F85DBD6B556708E0A6281EE6407 96533~|~1~|~2~|~02/STR~|~Plan Split for the Rural portions of the project. This includes BUT-732 from SLM 10.45-13.75~|~99 - State Preventative Maintenance~|~E6A030F62052F48FA14CD39630F3ABE8C885317A 96533~|~1~|~4~|~04/SAF~|~Centerline rumble strips as safety measure.~|~~|~55684260FE629E7B0A7ED96F157CA195CF32CD6F 125687~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. VIN 56 0.00-8.214.~|~05 - 4R Maintenance - Resurfacing~|~516A9227BA37E479B09050D45840535A98B0C76E 125687~|~1~|~2~|~02/NFP~|~ODNR funded project to resurface entire paved areas at Zaleski State Forest.~|~05 - 4R Maintenance - Resurfacing~|~1BF2C36032A38A837BD582D30F6C73A3530B7654 120858~|~1~|~1~|~01/MPO~|~install safety island and pavement markings~|~28 - Facilities for Pedestrians & Bicycles~|~387928551B853C4EE38FFE36FAB60C939DAA27FA 98149~|~1~|~1~|~01/STR~|~ROS 50 (0.00-11.26)~|~05 - 4R Maintenance - Resurfacing~|~BA8E05B1D0A30395608857D62480F075013F00CD 109875~|~1~|~2~|~02/STR~|~WAY SR 0241 04.29~|~04 - Reconstruction - No Added Capacity~|~254D67ABDFA682201F8DAEC5A1E1D28B6ACBA81D 109875~|~1~|~3~|~03/S>2~|~WAY SR 0585 18.43~|~04 - Reconstruction - No Added Capacity~|~63970CED3B21C66A1F80FA017956894CBE3301B1 109875~|~1~|~1~|~01/NHS~|~WAY US 0030 14.83~|~04 - Reconstruction - No Added Capacity~|~5F11059C103EFE45AA51406F5F387297BAAD2918 109875~|~1~|~4~|~04/S5K~|~WAY SR 0003 11.83~|~04 - Reconstruction - No Added Capacity~|~E9D3EA7C9EA807F7DDC53E9ABCF507E98702A06A 126687~|~1~|~1~|~01/NHS~|~Extrusheet sign replacement project in D10 for FY2033~|~21 - Safety~|~5C6557A605787F6A9FAE7EE160CCAA961050D52D 25597~|~1~|~1~|~01/NHS~|~Spot Repair Pavement and guardrail work on MAR-23 SLM 10.63-19.97. Includes paving over structure MAR-23-11.92~|~05 - 4R Maintenance - Resurfacing~|~E1D8762F8066705585B648AAC12C172AF4F768E3 25597~|~1~|~2~|~02/NHS~|~Bridge repair on 6 structures~|~13 - Bridge Rehabilitation~|~E7BC8EF746B06B275F928763E40D32FEE4B753D8 83390~|~1~|~1~|~01/ERD~|~Earmark funding for Phase 3B of the Camp Chase BikepathCosntruct multi-use path from Hall Rd to Sullivant Ave, includes new structure over I-270Local Sponsor - FRA County Metro Parks~|~28 - Facilities for Pedestrians & Bicycles~|~1726D158A7D83538FB871051318821676670C330 77527~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E165894D2FA8D2216E3713CA7202A9EC11E0C06 96302~|~1~|~1~|~01/STR~|~D09 GR FY19~|~21 - Safety~|~4AAAAA37CB0350D9B4F77B50FC21FBCAF654B76D 123572~|~1~|~1~|~01/SAE~|~FY2032 striping in D8. Routes TBD~|~21 - Safety~|~3FE1691080D03D98C827F7F66D67384E278E7F50 106240~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: FAY-62-13.17-14.42~|~05 - 4R Maintenance - Resurfacing~|~F16A04513CA4297A37E130703D4C0C9D6A6D16B0 106240~|~1~|~3~|~03/S<2/WCH~|~100% Local Items - pavement repairs, etc.~|~05 - 4R Maintenance - Resurfacing~|~4156FE32817EC9B714DBEFA6435A85D7034DA5BD 106240~|~1~|~2~|~02/S<2~|~Urban Area Plan Split - FAY-62-14.42 to 14.62~|~05 - 4R Maintenance - Resurfacing~|~93B9A280F2D77044F5DBCB071CD020B450A56756 82283~|~1~|~1~|~01/NHS~|~At 0.21 miles south of SR 562 Phase 6 of the HAM-75 corridor projects. Replace RR Bridge No. HAM-75-0722, SFN: 3109992, IORY RR over I-75.~|~22 - Rail/Highway crossing~|~F5E1E2FFD2A057FEB57D1FBFA8C63D3DC55F96DF 95942~|~1~|~1~|~01/IMS~|~Resurfacing and bridge maintenance work along IR 70~|~05 - 4R Maintenance - Resurfacing~|~D04CC7AC8A4F0881FCD8CBD545BB4A8171601847 95942~|~1~|~2~|~02/IMS~|~Change order for GUE-77 repair.~|~~|~2520C1AA40CEDE13049F4DA5A9D43D3CCB362D9D 126766~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~~|~511BF578B492262C144E00E000BFE39120EECF4A 122483~|~1~|~1~|~01/ENH/WARR~|~Sidewalk repairs and replacement.~|~28 - Facilities for Pedestrians & Bicycles~|~5B77E2021434B292C65C28D5EF37608C00147635 124395~|~1~|~1~|~01/S>2~|~Improvement of 12 crosswalks within the City of Upper Arlington.~|~28 - Facilities for Pedestrians & Bicycles~|~248780D791694254073CA88A3999DF6375674E3A 92783~|~1~|~1~|~01/NHS~|~Overlay with asphalt concrete:CLA US 40 SLM 9.95 to 10.82~|~05 - 4R Maintenance - Resurfacing~|~D8C9A695AC5BF2023952BD6C08446A0B6773AF63 92783~|~1~|~2~|~02/S<2~|~Overlay with asphalt concrete US 40 in Clark County: US 40 SLM 5.29 to 7.23 US 40 SLM 7.23 to 9.95~|~05 - 4R Maintenance - Resurfacing~|~CB8B9226481E8ED5485DDFA769AC4762990B17B7 121691~|~1~|~1~|~01/SAF~|~Radar Replacement.~|~21 - Safety~|~8490A08E663A7AC79AB83808422C4C3F13A71654 113484~|~1~|~1~|~01/SAF~|~Village of Leesburg SRTS project.~|~28 - Facilities for Pedestrians & Bicycles~|~50F17B45FA5F61CBE241BE71FEFE2DF47D517BBB 100178~|~1~|~1~|~01/NHS~|~SR 741 8.66 to 9.54 in the City of Moraine - widen the roadway of the East side to provide a SB left turn lane at Cardington Road and at Industrial Estates Dr. A NB turn lane will be added at Industrial Estates Dr. The alignement of SR 741 to the ramp to NB I-75 will also be modifed.~|~03 - Reconstruction - Added Capacity~|~706932E54A9BE6C5FE056854F6F814F4863D9587 124595~|~1~|~1~|~01/SAF~|~Install sidewalk on Old 74. ~|~21 - Safety~|~0E8DB46301139FFDCAFB0AF861A6050700FB2256 97361~|~1~|~1~|~01/NFP~|~Mowing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~00F1B278E08DF70DBBDAF02D5A78770F854C6D87 116245~|~1~|~1~|~01/NHS~|~Double application microsurfacing.~|~05 - 4R Maintenance - Resurfacing~|~89D55D653329E82A9486933C738B0818A1B6E7B4 116769~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~B97F48397646589518FD201E07FEF3CD70E8D5FA 105095~|~1~|~1~|~01/STR~|~HIG 41 2.02 Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~F8073E86F3E7E47C41EDBCEE4CF2376A092DD2B4 102925~|~1~|~2~|~02/BRO~|~Split for WOO-235-0614 structure~|~10 - Bridge Replacement~|~55289AB2D5FDC05AE77A576BA0B63D5DCCF48F7D 102925~|~1~|~1~|~01/BRF~|~Split for WOO-235-0644 structure~|~04 - Reconstruction - No Added Capacity~|~109E7143DB9F009E28E61879C8A7BE7B0431D460 96347~|~1~|~1~|~01/SAE~|~100% federal participitation on SRTS eligible work items.~|~~|~80134B9160BD73A05A1AAA3CA7F88E48D1682CF0 114894~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~459CDE6230AA832C9FEB43C420C8CF6C7BB687BD 114894~|~1~|~2~|~02/S>2~|~Resurfacing.~|~~|~CA2D86E4153A12385B4EE631F93735AB15DFBBAC 114894~|~1~|~3~|~03/STR~|~Minor bridge work.~|~~|~0EB28CEF23D7FCEF5B4FE7BE7B1704025916074F 125628~|~1~|~1~|~01/SAF~|~Install sidewalk on W Second St. ~|~21 - Safety~|~383F38DDE0497C0E78438BDD7724454B9FB9441A 83541~|~1~|~1~|~01/BRF~|~CEAO BR funds to replace CR-22/Scioto Darby Rd structure over Big Darby Creek, SFN 6530192Local Spnsor - PIC County Engineer~|~10 - Bridge Replacement~|~0125F90F55879640F2D7A8499CBBA81850DAF92D 98372~|~1~|~1~|~01/IMS~|~Major New funding to cut trees prior to 4/1/15~|~04 - Reconstruction - No Added Capacity~|~2E89FDB1EC0E1B7C1439CA5E8875B2B1F6DC9CB0 91992~|~1~|~1~|~01/STR~|~PIK SR124 0.00 - 7.53 resurfacing projectOn SR124, begin project @ Highland Co. Line, south for 7.53 miles and terminate 0.02 miles south of CR6 (Lapperell Rd.). Brdg to pave thru:6601189 PIK SR124 6.52 Intersect: Dry Bone Creek80/20 split~|~05 - 4R Maintenance - Resurfacing~|~94F3D3FD4742F6994FA237B401F2457BF49C1568 91992~|~1~|~2~|~02/STR~|~PIK SR124 Brdgs F/Rehab:6601111 PIK SR124 4.21 Intersect: Little Sunfish Creek6601146 PIK SR124 5.99 Intersect: Sunfish Creek80/20 split~|~13 - Bridge Rehabilitation~|~C3CF8D1226F19E555E8E997FB051BEB6FF2CB85C 92133~|~1~|~1~|~01/STR~|~resurface Woo- SR 25 1.75-6.29~|~04 - Reconstruction - No Added Capacity~|~A231D714E597716DD7B9D59DDE5790D33EEE87A9 92133~|~1~|~2~|~02/S<2~|~resurface Woo SR 25 6.29-8.42~|~04 - Reconstruction - No Added Capacity~|~08F527704E60A4B348CB02BC9C64F51CA8B0AE0A 92133~|~1~|~3~|~03/STR~|~Rural Bridges - Waterproofing and Seal & saw joints~|~13 - Bridge Rehabilitation~|~CC83B9866177069A42FD5FF84E005F7FEDA991A1 92133~|~1~|~4~|~04/S<2~|~Urban area bridge - Waterproofing and Seal & Saw joints~|~13 - Bridge Rehabilitation~|~50F4BCA466B20AEF3D9DBDD29B026B7CE7487201 124423~|~1~|~1~|~01/SAE~|~Roundabouts~|~21 - Safety~|~30120E7033367DD909958D0B090975A4A19F8037 103586~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. No local funds.~|~04 - Reconstruction - No Added Capacity~|~D4A20E675454396DA110855F49F8DA82E1C91B1A 91734~|~1~|~1~|~01/NHS~|~Two-Lane resurfacing project using a fine graded polymer treatment. HOC 33 16.06-18.48. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~7017792E4358B75570F56925C8DF7C86537EF224 103399~|~1~|~1~|~01/STR~|~Slide repair.~|~04 - Reconstruction - No Added Capacity~|~872B58E76230C0BFF6E09AF2A5134FBF351DE4C0 105662~|~1~|~2~|~02/NFA~|~Plans Split for Hen SR 18 8.462 culvert~|~04 - Reconstruction - No Added Capacity~|~100005F82B89232D9126D0F745A161B78A5CE2CE 105662~|~1~|~1~|~01/STR~|~Culvert HEN-281 @2.35 - on Fed. aid system~|~04 - Reconstruction - No Added Capacity~|~C29286568680DE5DD06FA4BB3B94D7D398E8BEA4 118881~|~1~|~1~|~01/STR~|~Resurfacing BEL-149~|~05 - 4R Maintenance - Resurfacing~|~D1B82474ACCD7A9960DC906F775518BE0F502079 101236~|~1~|~1~|~01/NHS~|~Resurfacing on NHS eligible portion (approx 73% of total cost) includes slm 2.3-5.87 and 10.65-11.26.~|~~|~626B86E118EC0E0CE5C53F984AD8B140BD282AC3 125636~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~41920689156A280F3D902DCCC64BAFD1A821AC8F 122089~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~5436E60AD56CA0C7CFE661B329A97915E4DC6FF5 104836~|~1~|~1~|~01/NFP~|~Plan split for guardrail repairs on the highway system~|~44 - Other~|~83BAEFB07B2FEC7BE9AE05E04A70C86CCBB72830 107758~|~1~|~1~|~01/NHS~|~Covers all work to rehab bridge.~|~13 - Bridge Rehabilitation~|~0F766D7B829E0D1E9191A15E6DC4DD20815815D4 121697~|~1~|~1~|~01/SAF~|~Radar detectors.~|~21 - Safety~|~6F6AFF6978CF0B3F05169D2988871AA92B051AB8 93572~|~1~|~1~|~01/MPO/HUR~|~Bike path in the City of Huron 80% ECRCP/20% Huron.~|~~|~6458C3BEF67AB7D54DEFAA03F336C4D0E581DC4E 93572~|~1~|~2~|~02/ENH/HUR~|~Bike Path within the City of Huron, 100% City funds above cap.~|~~|~FBA6A783D5C3BF4D67B0B2AF546C4E442FB347BF 106436~|~1~|~1~|~01/BRF~|~Deck Replacement; Federal/State Exchange eligible project. 80% State 4C87/20 Local LNTP.~|~13 - Bridge Rehabilitation~|~F1228BB13E908A9D5F24990E95FD6653A3C15DE2 94143~|~1~|~1~|~01/NFA/GCPA~|~"01/NFA/PV/GCPA" Guernsey County Port Authority Project utilizing various funds for resurfacing of Hope Ave (CR247) Funds (ARC $148,110, State 629 $50,000, Jackson Township $21,027.~|~05 - 4R Maintenance - Resurfacing~|~9A50B64DCFF0BFEAB6FACEF53E166B7B06ED835F 87383~|~1~|~1~|~01/S>2~|~Replace bridge with deficient deck and wearing surface with minimal approach work on SFN 5709393 MOT 201 5.31 SR 201 over a tributary to Mad River, 3.85 mile South of IR 70 and .5 mile South of Huber Heights Corporation Limit.~|~10 - Bridge Replacement~|~4749319636521693A6990D6898B5B7B75A2DFEAF 79760~|~1~|~1~|~01/NHS~|~Resurfacing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~197041EB0134CEC8BD559EB702D2A0DF5683122C 124245~|~1~|~1~|~01/IMS~|~Plan split for WOO-75 & WOO-475~|~21 - Safety~|~D335279DE7FC86D3040DCC430975A0CA945A2CBC 124245~|~1~|~2~|~02/NHS~|~Plan split for pavement markings for HEN-24, LUC-24, SAN-20 & WOO-20~|~21 - Safety~|~7BE68EC08C476BD2D010919ED11B57A8B6D65A88 105358~|~1~|~2~|~02/NFA~|~Chip seal on non-Federal route:AUG SR 198 SLM 4.85 to 7.90~|~05 - 4R Maintenance - Resurfacing~|~295F8C45DB04C5995CFBF70C7043863404FF0331 105358~|~1~|~3~|~03/S<2~|~Chip seal on small urban route:AUG SR 198 SLM 2.67 to 3.75~|~05 - 4R Maintenance - Resurfacing~|~EB23797957775688FEABDC2F10DA5D7C8674DE54 105358~|~1~|~1~|~01/STR~|~Chip seal on rural routes: AUG SR 219 SLM 7.71 to 14.12MER SR 197 SLM 3.37 to 6.33MIA SR 721 SLM 0.00 to 2.82MIA SR 721 SLM 3.22 to 5.52AUG SR 67 SLM 8.25 to 13.48AUG SR 67 SLM 14.43 to 18.94AUG SR 198 SLM 3.75 to 4.85AUG SR 219 SLM 0.00 to 1.09AUG SR 219 SLM 1.09 to 4.11AUG SR 219 SLM 4.11 to 6.84MIA SR 718 SLM 0.00 to 3.26~|~05 - 4R Maintenance - Resurfacing~|~3E01CE9E55A9AF741C70FEB83744145459C866CF 96729~|~1~|~1~|~01/NFA~|~Trumbull County Cortland Garage, build new fabric salt building - tonnage and size to be determined. Tear down 2 salt storage structures.~|~~|~AC8802B7DDD51902B69338D80C55BEC49E34DCDF 116181~|~1~|~1~|~01/NHS~|~Plan Split for work associated with IR 77~|~05 - 4R Maintenance - Resurfacing~|~937FC19970020460F7E3B32A8015FB8B44FAB86A 116181~|~1~|~2~|~02/NHS~|~Plan Split for work associated with routes on the NHS.~|~~|~91FD116376F11CC25FAE310D55E4A777A745AF42 116181~|~1~|~3~|~03/S50~|~Plan Split for work associated with a STP from 50k to 200k.~|~~|~7E4BCE634017ED387A366711CE74952396DCAFA6 116181~|~1~|~4~|~04/S5K~|~Plan Split for work associated with a STP of 5k to 50k.~|~~|~EFE323705C3D1C06399D4A44902A366078E8169F 116181~|~1~|~5~|~05/STR~|~Plan Split for work associated with a STP of Rural.~|~~|~DBFEEAD1B562B2E809B9926D7CA0ECE7B4206010 102551~|~1~|~1~|~01/STR~|~plan split for the Rural sections~|~05 - 4R Maintenance - Resurfacing~|~2C1D1051BA84FF52DD476499B847C2917225C343 98584~|~1~|~1~|~01/STR~|~Replace small culverts BUT-129-0186, BUT-503-0273, and BUT-503-0579. Maintain small culverts BUT-503-0322 and BUT-744-0919.~|~04 - Reconstruction - No Added Capacity~|~392EB8B203A0665A92A30370DDFCBE03802AA1F9 98584~|~1~|~2~|~02/IMS~|~Maintain small culverts HAM-71-1987 and HAM-71-1090.~|~04 - Reconstruction - No Added Capacity~|~E7356CF643AE645CBE208C5348BB94FBAE80E30C 98584~|~1~|~3~|~03/NHS~|~Pave invert BUT-129-2431~|~04 - Reconstruction - No Added Capacity~|~CBF56B3E8186456E90184CB0888D90D56FC0093C 98584~|~1~|~4~|~04/STR~|~Water work relocation at BUT-129-0186.~|~04 - Reconstruction - No Added Capacity~|~78A27E8B1C4AEE7F66518005FFB3CEABA649A7D0 100332~|~1~|~1~|~01/NFP~|~This is the district?s annual long line pavement marking project.~|~21 - Safety~|~5CA29C00B6DAC815F5A86A776A36384D05F0D617 98599~|~1~|~1~|~01/IMS~|~Plan split for bridges eligible for IM funds~|~13 - Bridge Rehabilitation~|~03C176E9050DAE8D49CB4F235C82F74860B0F848 98599~|~1~|~3~|~03/S>2~|~Split for work on the STP bridge~|~13 - Bridge Rehabilitation~|~AB307802A9B4FF9A530640391E3935DD88DF1DCD 98599~|~1~|~2~|~02/BRO~|~Split for bridges eligible for BR funding at 90/10~|~13 - Bridge Rehabilitation~|~86799D422AEEBFD0BC0AC367809479CE78FD61AC 98599~|~1~|~4~|~04/BRO~|~Split for bridge eligible for BR funding on the NHS at 80/20.~|~13 - Bridge Rehabilitation~|~827275C8059C10E6FC051D1A4C8E3D0DD43D4BEA 98599~|~1~|~5~|~05/BRO~|~Ongoing services for the structures listed~|~17 - Construction Engineering~|~3A7FD03DAD5781773D3516129771A13E7A637BA2 92553~|~1~|~1~|~01/SAF~|~Add southbound left turn lane from US42 to Ledbetter~|~21 - Safety~|~929FD0E0FC9C8B580F5557B1F15E12E935DE4704 86728~|~1~|~1~|~01/STR~|~WAY 94 14.16-21.25/ WAY 585 11.95-13.92/ WAY 585 14.78-15.87~|~05 - 4R Maintenance - Resurfacing~|~687E3C7CE8C8F431B35523F47196C3FC1290F2FD 86728~|~1~|~4~|~04/STR~|~Structure work for: SFN 8504059 (WAY 94 16.74), SFN 8504083 (WAY 94 18.30), SFN 8504113 (WAY 94 19.00), SFN 8506124 (WAY 585 15.14)~|~13 - Bridge Rehabilitation~|~73BBC93A18361915270F5B9EC76D27F20EA8C5CC 86728~|~1~|~2~|~02/S<2~|~MED 94 0.00-1.16/ WAY 94 21.25-21.48~|~05 - 4R Maintenance - Resurfacing~|~9618901B390F841E2035FAE7530A40E131D064D7 86728~|~1~|~6~|~06/NHS~|~Structure work (< 20' length): SFN 8506248 (WAY 585 18.51)~|~~|~CA537F3FF8291D38EC6A735424A8788F5F2489B1 86728~|~1~|~3~|~03/NHS~|~WAY 585 15.87-18.70~|~05 - 4R Maintenance - Resurfacing~|~DFA2D51744295CBAE1FB51B322BD45A5ACAE9996 86728~|~1~|~5~|~05/NHS~|~Structure work for: SFN 8506213 (WAY 585 16.48)~|~13 - Bridge Rehabilitation~|~E5B1D6E0FB9A34B48726A776C218DE01F14FA785 108361~|~1~|~1~|~01/NFP~|~ODNR - Harrison State Forest.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~50554BCCAA92E7F837A46712988327E334C8E699 103508~|~1~|~2~|~02/NHS~|~Split for MPO funds~|~~|~092D320FF8C9931B1CF05F9FD8566FF2E430E18C 103508~|~1~|~3~|~03/NHS~|~100% other~|~~|~25B220F2380AB747846D893AEA24033168C73EDA 103508~|~1~|~1~|~01/NHS~|~Urban paving - top 3.25" of paving~|~04 - Reconstruction - No Added Capacity~|~FB0C5C5C9CB6CF8C44923EA0B10E42C103934EB0 118353~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at ERI-269-3.67/Portland Rd~|~21 - Safety~|~62C2893D37EA9C83F19998160913A3ECF5315BCE 118353~|~1~|~2~|~02/NFP~|~Erie County water line work.~|~21 - Safety~|~EE0AB4A465707E002AB9A1CA45A5B948D33E473B 107928~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 in Defiance County outside the Defiance urban area. From the Defiance Urban Area boundary at SLM 9.08 to the county line at 15.54. Uses district preservation funds (80% Fed and 20% State). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~8EBC0AC2B6298861960FDC800EAA6B0CC54C7F44 107928~|~1~|~2~|~02/S<2~|~Resurfacing on SR 66 in Defiance County inside the Defiance urban area but outside of the City of Defiance. On both sides of the road from the beginning of the project where SR 66 leaves the City of Defiance at SLM 7.82 until SR 66 enters the City of Defiance at SLM 7.83 then on the left side of the road starting where SR 66 leaves the City at SLM 7.99 until SR 66 leaves the City on the right side at SLM 8.04 then on both sides of the road to the Defiance Urban Area boundary at SLM 9.08. Uses district preservation funds (80% Fed and 20% State). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~33A0389221E0712C3232BF4424FA24E9602F5691 107928~|~1~|~4~|~04/SAF~|~Center line rumble stripes. Will be paid for out of Safety Program Funds.~|~21 - Safety~|~26B741B1247021015B720045505EA09D3F52DECF 107928~|~1~|~3~|~03/S<2/DEF~|~Resurfacing on SR 66 in Defiance County inside the City of Defiance. On both sides of the road from where SR 66 enters the City of Defiance at SLM 7.83 then on the right side of the road when SR 66 leaves the City on the left side at SLM 7.99 until SR 66 leaves the City on the right side at SLM 8.04. Uses federal district preservation funds with a 20% City of Defiance match.~|~05 - 4R Maintenance - Resurfacing~|~49A3749D4DE91D43BB0CA3CDA65BD35693B1F6DA 107928~|~1~|~5~|~05/NFA~|~Retroactive fuel price adjustment ~|~05 - 4R Maintenance - Resurfacing~|~04C941564180D0EB5C7D8FA9A09FC1A8B2FDF0B7 86839~|~1~|~3~|~03/S<2/Shel~|~100% City of Shelby items~|~05 - 4R Maintenance - Resurfacing~|~2C677015F38FBF2DBCED5B61E1B14677FA321E70 86839~|~1~|~1~|~01/S<2~|~District Allocation (4PF7/4PS7) for pavement outside of Shelby Corp. Limits~|~05 - 4R Maintenance - Resurfacing~|~4F8CEB370D5D3B0A580A60699A5D214C56C688FB 86839~|~1~|~2~|~02/S<2/Shel~|~Urban Paving: District/City (4PF7/4BG7) project eligible items within City Corp. Limits~|~05 - 4R Maintenance - Resurfacing~|~C3D4D04A3C88F500AAE0C2DE5D2F7C6140C5660E 86839~|~1~|~4~|~04/S<2~|~Bridge workSFN: 7001975 RIC-39-3.51SFN: 7003145 RIC-61-4.79~|~47 - Bridge Preventive Maintenance~|~D8DC1593754B62D2C9541614ABCF4BC73AB7C293 101416~|~1~|~1~|~01/STR~|~Plan Split 01 is a STP Rural category, includes SR and US~|~05 - 4R Maintenance - Resurfacing~|~5F7C50568F79EDEDB5C9BEC9C7229EE91DBB450D 112839~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 45 from 11.77 to 14.15.~|~~|~5667321D104DD02F626E24679672C27ACED89843 112839~|~1~|~2~|~02/STR~|~Minor bridge rehab > 20' span.~|~~|~EDB6532422064B1DAEF5235CD21D0501173B9845 112839~|~1~|~3~|~03/STR~|~Minor bridge rehab > 10' to 20' span.~|~~|~80F52E2B095A28540626537F5317E7F618331BAA 122334~|~1~|~1~|~01/NFP~|~Plan split for district wide tree removal~|~99 - State Preventative Maintenance~|~AA4E9A1A1A9BF39D6957754E4D688D46DFBCA8D3 98640~|~1~|~3~|~03/IMS~|~Trenchless culver repairs SHE-75-12.73 & SHE-75-13.18~|~04 - Reconstruction - No Added Capacity~|~F13F76E82758E8AD33411F6DC8442F8DFDE06A1C 98640~|~1~|~1~|~01/NFA~|~LOG-287-07.76 trenchless culvert repairs.~|~04 - Reconstruction - No Added Capacity~|~E5A48100F8AF1A4FDB465AC7CA75AA0A59F7FBD5 98640~|~1~|~2~|~02/STR~|~DAR-36-00.70 - LOG-292-17.92 trenchless culvert repairs.~|~04 - Reconstruction - No Added Capacity~|~C31AD5266CEF7DFDA2F19B11FAAF0E782172AE9E 122810~|~1~|~2~|~02/NFP~|~Plan Split for scope not eligible for TAP/CRP/Safety~|~28 - Facilities for Pedestrians & Bicycles~|~21DCD8EBD776B4899857130F2970EF1AE0985845 122810~|~1~|~1~|~01/ENH~|~Funding split for downtown enhancements and pedestrian improvements TAP (CRP / Safety) and Earmark funded plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~60E7E7E5ECB878F635D1272366B7971916D1F4CC 102197~|~1~|~1~|~01/STR~|~All work to replace the culverts. District Preservation Program funds. 80% federal SAC 4PF7 and 20% state funds SAC 4PS7.~|~04 - Reconstruction - No Added Capacity~|~04EFDB7F57CC610916A5BE7F036B1910CF3EFFDF 121599~|~1~|~1~|~01/NFA~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A0D5DF47B3B738962B8FF9C0AABE1F0F91461151 121599~|~1~|~2~|~02/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~C8A88A4AB8138A040E667BF9DDA8B7004FEA75A8 96518~|~1~|~1~|~01/IMS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~4543948C91025971F327FE669B4419C24AF15205 96518~|~2~|~3~|~03/IMS~|~Superstructure replacements.~|~10 - Bridge Replacement~|~CF1169610D8024250CA3F973AA65F7391424C395 96518~|~1~|~2~|~02/IMS~|~Bridge preventive maintenance > 20' span.~|~47 - Bridge Preventive Maintenance~|~3DFBDBB9688EBC39B82B9818A80929944D98E359 124864~|~1~|~1~|~01/NFP~|~Pavement markings and RPM replacements on various routes in POR, STA and SUM counties.~|~21 - Safety~|~2CBFDAA63B3CF6276EF1DA889CAFE23DCC8E4E10 83706~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MEG 681 9.25-17.49. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B50DFE0F2F6BA1654EEC0B260AC256F85DD0C46B 83706~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~FC0FCFDC5DC2BFDB0C25876E86D8068F6FD539BA 117187~|~1~|~1~|~01/IMS~|~Replace fence on top of retaining walls adjacent to IR 670~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C32967A9C06C97CEAB37011CC778BADD0B856828 117187~|~1~|~2~|~02/IMS~|~Aesthetic enhancement of fence~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E7F93EB4FC6EDCD9A85C119A7DA1EEE3F7BED016 122805~|~1~|~1~|~01/SAF~|~All work included in the split.~|~21 - Safety~|~8B024F0EC152718BE4DC89BA563968928D2B6C3A 120625~|~1~|~1~|~01/IMS~|~Split for Bridge Preservation work, Deck Sealing.~|~47 - Bridge Preventive Maintenance~|~F89FB3FABA25568AD20285A5C1B1FB041B08E016 107378~|~1~|~1~|~01/NHS~|~Split for paving work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~7F11FB15A05B4FAF0CFE82FF45B89C6616A89881 94124~|~1~|~2~|~02/NHS~|~0800798080020136004323600440~|~13 - Bridge Rehabilitation~|~5D4E09F7497FAF68C387D0BEBC2A2713C61E43A8 94124~|~1~|~1~|~01/STR~|~Deck Sealing Preventive Maintenance project3604179~|~13 - Bridge Rehabilitation~|~BACD22FEDF3351350017D231ABB55A8F286DBF57 114990~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~ECD8E9954756663E2D7C31D2A25D88DB02E79CD6 114990~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using a chip seal treatment.~|~05 - 4R Maintenance - Resurfacing~|~72456F9372DE02DC88DEA9DC96C43185E5E44441 95461~|~1~|~1~|~01/STR~|~Pavement Reconstruction on Per-SR 13-19.83 to 28.15~|~04 - Reconstruction - No Added Capacity~|~04E20CE2CF6A66C0A7FD85919174B60C9331BA8E 100963~|~1~|~1~|~01/S<2~|~Chip seal POR SR 305 from 0.48 to 1.66.~|~05 - 4R Maintenance - Resurfacing~|~56F214CF90DCD83B209D24C334E3CEBD1C997D3E 100963~|~1~|~2~|~02/STR~|~Chip seal POR SR 305D from 0.00 to 0.09 and POR SR 305 from 1.66 to 5.65.~|~05 - 4R Maintenance - Resurfacing~|~32B8855BB9C1AB3988A20D3BE3A50C7371C756C6 103367~|~1~|~1~|~01/STR~|~Emergency project to repair a landslide. WAS CR 60 5.33. DSR WAS-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~026B31A59FE44B3C9A4D8DE4FBADE398BED634F8 120256~|~1~|~1~|~01/S>2~|~Pavement reconstruction and associated improvements on SR 37 ~|~04 - Reconstruction - No Added Capacity~|~752D9D9DE1FB5A4481BEFF5CB5AC5F1E7F2FB181 115375~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4.~|~21 - Safety~|~70EF60C4AA86571D46626C156C0BA7052A32933B 115375~|~1~|~2~|~02/NFP/CANT~|~Wet reflective pavement markings on the Urban System in Canton.~|~21 - Safety~|~6D8D39D06DCF2C2DABA2C00E618AA87361BC210C 115375~|~1~|~3~|~03/NFP/LOUI~|~Wet reflective pavement markings on the urban system within the City of Louisville.~|~21 - Safety~|~FCF2DDA1C23A550BBC768487D737BCB7D77B1ACF 115375~|~1~|~4~|~04/NFP/MACE~|~Wet reflective pavement markings on SR 8 (urban system), in the City of Macedonia.~|~21 - Safety~|~9A80D430309BC9FC611E2DA416994475FBD2884D 91144~|~1~|~1~|~01/SAF~|~Two-year guardrail repair (ding and dent) contract for FY 2016 and 2017. 100% State.~|~44 - Other~|~5A372634D1708081EAD84907AF0722E5D33E9237 126619~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~44 - Other~|~8ED86E73B7E9D0AD77EC8679D817CDF12E1D240F 119493~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County.~|~44 - Other~|~F71C6EF5A198D0B35FF714A00DD499765DF60C94 82382~|~1~|~1~|~01/IMS~|~Plan split for major rehab to CCG3A pavement and conduit work. ~|~04 - Reconstruction - No Added Capacity~|~D76E624869BEBFD96E82A372081D347665E6CF30 82382~|~1~|~2~|~02/IMS~|~Plan split for bridge replacement and removal.~|~10 - Bridge Replacement~|~7B18E1E26CE37184503D5F439150E2C9493C31C2 82382~|~1~|~3~|~03/IMS~|~Plan Split for new bridges~|~08 - Bridge - New Construction~|~7ED0ABA9AE2D046644607C9F5E07A9DCE3C7887A 104120~|~1~|~1~|~01/ENH~|~Multi use path.~|~28 - Facilities for Pedestrians & Bicycles~|~A26703C30112960E3989CA012F7EB4172A39DB16 116192~|~1~|~1~|~01/NFP~|~Bridge Maintenance Project~|~47 - Bridge Preventive Maintenance~|~22DFC4748911EDA4A7F26A38D438C9FA97EA8A7D 118663~|~1~|~1~|~01/SAF~|~Pavement Marking.~|~21 - Safety~|~DEC29BDAB3382AE72E94EF23CD4AD3CF658B4AD7 125523~|~1~|~4~|~04/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8D58A2DCEAF48A5EC71A28AA20A8EBF0056B4E0A 125523~|~1~|~2~|~02/NHS~|~Resurfacing.~|~17 - Construction Engineering~|~979929343FE79BC62665534D5739DEDD23A50E8A 125523~|~1~|~1~|~01/IMS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A203C9665D2870D2360F617D6B9EA9CD313390FA 125523~|~1~|~3~|~03/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~476B3A0A766F7B04A63BF7FE92EA22998DCCB780 77942~|~1~|~1~|~01/STR~|~For Bridge Nos. GRE-72 1876 and 1883, SFNs: 2902079 and 2902109 respectively: replace the existing concrete slabs on existing substructure units and perform other minor rehabilitation. The bridges carry SR 72 over the Little Miami River (1876) and a tail race to the Little Miami River (1883).~|~~|~7D448A3511A468293AA250C72BD802480F973F99 104765~|~1~|~1~|~01/NFP~|~Security system for SUM Interchange outpost.~|~44 - Other~|~E37E783126192CD4468E3EC80DD0CA7FAFCF44F8 109621~|~1~|~1~|~01/IMS~|~"01/IMS/OT/ " - No CAP - 90% Federal (4PF7)/10% State (4PS7) - replacement of tower lighting with partial interchange lighting.~|~21 - Safety~|~7675DC92886942FFDE6373208E14D5D88A9C0067 122890~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~44 - Other~|~4FC74F5D8844E7F42D922EEE118B2AB40BB64565 90390~|~1~|~1~|~01/CMQ~|~CMAQ funding to upgrade signals at 9 intersections in Grandview Heights~|~21 - Safety~|~513B9604B50BDC8C584A280E46F5F5CD72EFF0B3 109519~|~1~|~1~|~01/SAF~|~Work at the interchange of US42 and US33 including widening the off ramps to provide turn lanes, minor work at the on ramps and installing signals.~|~21 - Safety~|~F6C511F0F849737583965BC4BE2B3AAA12995098 103136~|~1~|~1~|~01/STR~|~Plan Split 01 created for FY20 Construction Engineering Services~|~17 - Construction Engineering~|~55C7E0658C90EB315B539004FB8CF4EABAB6D39A 103136~|~1~|~2~|~02/STR~|~Plan Split 02 created for FY21 Construction Engineering Services~|~17 - Construction Engineering~|~1B0E42F940EE8A54050BD2A9ECF3A848CD66E2ED 96249~|~1~|~1~|~01/SAF~|~A DDI at SR-25/I-475 interchange in Perrysburg.~|~21 - Safety~|~B393ABEE9F4BE8E86FF46CC456525D7D7BC4DB97 96249~|~2~|~2~|~02/SAF~|~Second split for City of Perrysburg particle funded items~|~21 - Safety~|~E8F3944474C2026C61E0FE51F07F7281766FA500 96249~|~1~|~3~|~03/NFP~|~100% Costco funded split to pay for the fence upgrade. Upgrade will be per foot @? Unit Price of Chain Link Fence (upgrade): $17.22/ft.? Unit Price of Woven Wire Fence (current): $9.70/ft.? Quantity of Fence: 714 ft.? UP Difference = $17.22/ft. - $9.70/ft. = $7.52/ft.~|~04 - Reconstruction - No Added Capacity~|~C034A316246E0D822EB5B76C63FCCC79E99EB0B1 95862~|~1~|~1~|~01/NFP~|~@SLM 7.77~|~04 - Reconstruction - No Added Capacity~|~41E4EAAAEAE52E30B63C770580083C1673B84FAA 117085~|~1~|~1~|~01/NFA~|~D09 HS FY2024~|~44 - Other~|~E698F228866E138D679CECFC3C3414F885EA1E2D 95167~|~1~|~1~|~01/STR~|~Landslide cause by an oversteepened embankment. Extend culvert and regrade slopes.~|~04 - Reconstruction - No Added Capacity~|~091B1E5A8FF0870D9CDD9C3866177DF10E28EEAD 116111~|~1~|~1~|~01/SAF~|~100% CEAO HSIP funding for upgrading guardrail on various county roads~|~21 - Safety~|~7EDDBEE9266614FA520DA093141AF1A8B3AA6A65 101612~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal)/4PS7(10% State) - No CAP - Resurfacing with related work on IR 70.~|~05 - 4R Maintenance - Resurfacing~|~BA1B4A252114C2A6CFC193398C3B2F9D065DE3FE 108969~|~1~|~1~|~01/ENH~|~Connect existing sidewalks on N. Plains Road (SR 682) to existing facilities at the Athens High School via proposed sidewalks along Elm St., Oak St., and the block of N. McDonald St. bounded by Elm St. and Oak St.~|~28 - Facilities for Pedestrians & Bicycles~|~3D1F2024DC23C38420EB322BAFF36159877A979E 108969~|~1~|~2~|~02/S<2~|~100% Township items.~|~28 - Facilities for Pedestrians & Bicycles~|~E88F3DDE932C9FC5A2C74AC66F126AECF5785A5D 116241~|~1~|~1~|~01/STR~|~Overlay in SCI.~|~05 - 4R Maintenance - Resurfacing~|~B14EF9D541C7CEEE8BA88C8DA0D230EFCBC7E9EB 87201~|~1~|~1~|~01/STR~|~This split is for resurfacing with rural federal STP funds with a 20% state match. All funds are from the District Preservation Program. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~A14C5273F2E89536410D4B4EA544E20CB2708AFB 102570~|~1~|~1~|~01/NFA~|~All work on SR 701 in Hardin County and which is from SR 309 to US 68 (0.00 to 8.93). All work on SR 709 in Van Wert County which is from SR 118 to SR 116 (0.00 to 9.20)~|~05 - 4R Maintenance - Resurfacing~|~910E518A1D1ED159875FBD09C1FD0EBAFCDD8685 102570~|~1~|~4~|~04/NHS~|~Work on SR 309 in Allen County from the beginning of the project at Devonshire Drive (15.99) to Perry Chapel Road (17.37). Federal NHS funds. All funds are from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~57C0B98EB2B4B1AD4684BF5AE19B2B249170AB7A 102570~|~1~|~5~|~05/NHS/LIMA~|~Work on SR 65 in Allen County from Fourth Street (5.10) to Elm Street (6.58). Federal NHS funds from the District Preservation Program budget with the 20% match provided by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~E713ABA0140F8CDC4FAACA40BC3C2C1EBAF1E407 102570~|~1~|~3~|~03/STR~|~Work on SR 309 in Allen County from Thayer Rd.(18.19) to the Hardin County Line. All work on SR 2 in Defiance County. Work on SR 697 in Van Wert County from SR 116 at 0.00 to the Delphos Urban Area boundary at 5.54. Work on SR 235 in Hardin County from SR 309 at 15.99 to the south boundary of the Ada Urban Area at 16.80.~|~05 - 4R Maintenance - Resurfacing~|~E75CDAA7066A1F4B4CF9217ADD4816C67E17DCBA 102570~|~1~|~2~|~02/S<2~|~Work on SR 697 in Van Wert County from the Delphos Urban Area boundary at 5.54 to the west corporation limits of the City of Delphos at 6.58.Work on SR 309 in Allen County from Perry Chapel Road (17.37) to the Lima Urbanized boundary at Thayer Road (18.19). Work on SR 117 from just east of Greely Chapel Rd (19.14) to Bowman Rd. (19.97). Work on SR 235 in Hardin County from the Ada Urban Area boundary at 16.80 to the north corporation limits of the Village of Ada at 19.26. Work on SR 81 in Hardin County from the west corporation limits of the Village of Ada at 2.25 to the east corporation limits of the Village of Ada at 6.58. All funds are from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~56EDD9FCCB42F85A86109F91A5D4AA0D6DAD9C34 112327~|~1~|~1~|~01/SAF~|~JAC 93 14.29-17.46 Signal Upgrade~|~21 - Safety~|~3922613399547E740F317998C9DF5EA024A7CD79 122426~|~1~|~1~|~01/BRO~|~Replace superstructure on bridge carrying US 62 over Wolf Creek.~|~10 - Bridge Replacement~|~0D02ACFD5B7F46FC755669F5C59EE7DD91DB5B51 119127~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~42F7FBEA3EA9B2CBDCBD3977E8023CDC2BA3BC9E 119127~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~D35D15B571E31256D8C0FC5E9FA82F075069434C 125389~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~390C3DB4991CBE9385309C84028155225033BC38 92451~|~1~|~1~|~01/STR~|~$512,996 in Federal and state funds from the ODOT Central Office Geologic Site Management (GSM) program. Funds over this amount will come from District Preservation Program funds.~|~44 - Other~|~11FEF9A984AEE373F9B8FD40CD6ED2CD9A08E64B 79374~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1808567~|~~|~49EAA7B2C494FA785F18A6EC46004B4315DA908A 92129~|~1~|~1~|~01/S>2~|~resurface Woo US 6 11.75-14.81; from about Rudolph to I-75~|~05 - 4R Maintenance - Resurfacing~|~2576F2CD01A5A4762E9198881F70908B8CA04401 92129~|~1~|~2~|~02/STR~|~resurface Woo US 6 14.81-17.46; from I-75 to about Chamberlain Road~|~05 - 4R Maintenance - Resurfacing~|~7B8502CFD15B66E3792850A355BB4638B87CBC31 114780~|~1~|~1~|~01/IMS~|~Cost to rehabilitate and paint Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati including necessary work on WHT.~|~13 - Bridge Rehabilitation~|~0DFDF2598AA81BE5EE88F80AABD22BA8674E5191 104095~|~1~|~1~|~01/IMS~|~This split is for the costs associated with removing both mainline IR75 bridges over the abandoned railroad using District preservation allocations from SACs 4PF7 and 4PS7.~|~~|~1170BEAA7C65DD59A8BD6C5A66313893D157D7D1 104095~|~1~|~2~|~02/IMS~|~Pavement work in the project using District preservation program funds SAC 4PF7 and 4PS7.~|~~|~587F234903E1F93D1CBAF4584D43ABFFFA6FFAFA 119513~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~56E37222DAEA9D46B89D10D8FD7039C6DFA0AA88 109825~|~1~|~1~|~01/STR~|~Overlay in Highland County.~|~05 - 4R Maintenance - Resurfacing~|~F30E50EB22F5246B29EDE6BC6919DCACCA26B085 109825~|~1~|~2~|~02/S<2~|~Overlay in Highland County.~|~05 - 4R Maintenance - Resurfacing~|~DD7075BEC56829B4242207401F2CB568F94E586B 109825~|~1~|~4~|~04/S<2~|~Bridge PM work.~|~47 - Bridge Preventive Maintenance~|~3A0062BE25330F55ED02317503563EF9153E4EBC 109825~|~1~|~3~|~03/STR~|~Bridge PM work.~|~47 - Bridge Preventive Maintenance~|~9E4EEBDD40FB03E7B6BA8B7F7299786FB0668C4A 117279~|~1~|~2~|~02/STR~|~Traffic signal work at the intersection of State Route 78 and County Route 56.~|~21 - Safety~|~7D837EB587BC3990CDFA029B9678369054A0CAB6 117279~|~1~|~1~|~01/SAF~|~NOB SR 78 at 7.15 Intersection/CR 56. Funded 90% Federal Safety/10% State. ~|~21 - Safety~|~260BF3F1148F0FDA2FAE6621FBBE71EECAB4C2F9 117279~|~1~|~3~|~03/SAF~|~NOB SR 821 8.014 includes sidewalks, curb ramps, crosswalk and an RRFB. Funded 90% Federal Safety/10% Local.~|~21 - Safety~|~A45225071554547E8567E0B4993C2CBDAB7F72F8 25735~|~1~|~2~|~02/NHS~|~Bridge rehab work (sealing, asphalt OL) on 11 structures:2515636 FRA SR315 5.18 Intersect: Ackerman2515520 FRA SR315 5.92 Intersect: Ramp(315NB To W.N.Brodwy)2515539 FRA SR315 6.17 Intersect: Over Olentangy River Road2515555 FRA SR315 6.17 B Intersect: Over Olentangy River Road2515563 FRA SR315 6.27 Intersect: Over West N.Broadway2515679 FRA SR315 7.44 Intersect: Pedestrian Overpass2515717 FRA SR315 7.78 Intersect: Over Henderson Rd2515741 FRA SR315 8.56 Intersect: Bethel Rd2515822 FRA SR315 9.85 Intersect: Over Park Access Road2515830 FRA SR315 9.85 Intersect: Over Park Access Road2515903 FRA SR315 11.66 Intersect: Wilson Bridge RdNot BR eligible - in NHS portion of project03/NHS/BR/~|~13 - Bridge Rehabilitation~|~3E467DDCAD96DE5F10D749CE2D06A894002C5AAA 25735~|~1~|~1~|~01/NHS~|~Pavement minor rehab on SR-315 from SLM 5.18-11.82 (Ackerman to 270) Includes paving of Bethel Rd from Olentangy River Rd to SR-315 ramp and upgrade of signal at Bethel Rd and Olentangy River Rd01/NHS/PV/~|~05 - 4R Maintenance - Resurfacing~|~E9B8826E5FCC044DB0B7A3D166070DE6278DA3CE 97842~|~2~|~2~|~02/BRF/BEL~|~OBPP replacement of SFN 0731978~|~10 - Bridge Replacement~|~6FCED6F58119E5536C3F251F5945020A8257E54A 97842~|~1~|~1~|~01/BRO/BEL~|~OBPP replacement of SFN 0730394~|~10 - Bridge Replacement~|~F3E446DA6BCAB710DBCAD1DB2FB0B2E04927301B 93763~|~1~|~1~|~01/NHS~|~Overlay bridge deck with mirosilica concrete and reface abutments using anodes and catch floor spalls along abutment with refacing with haunches or additional facing width, use anodes in this area on SFN 5701147 MOT 4 2264 L and on SFN 5701171 MOT 4 2264 R.~|~13 - Bridge Rehabilitation~|~28991DDEABD30740612D3BAEE995D09815F5575E 106696~|~1~|~1~|~01/S<2~|~Rehab historic bridge.~|~13 - Bridge Rehabilitation~|~0BFCEB1CA8C9A0889B3298FF1925EC7E01E68E1F 107000~|~2~|~2~|~02/STR~|~Superstructure replacement at SLM 1.2~|~13 - Bridge Rehabilitation~|~225F8E039195F2655643BEC0020D64BFD84CE562 107000~|~2~|~3~|~03/STR~|~Bridge replacement at SLM 2.0~|~10 - Bridge Replacement~|~2EF271F7260B885A5B03B0F72AD0BD26996961DC 107000~|~1~|~1~|~01/STR~|~Replace box culvert at SLM 4.06~|~04 - Reconstruction - No Added Capacity~|~F59EFB16F9AC64DEB837A40AC7CA936C36257AA7 90200~|~1~|~1~|~01/IMS~|~Study for preferred alternative concept in the vicinity of the Existing I-71 and US 36/SR 37 Interchange in Delaware County~|~01 - New Construction~|~540E5B158677F8E4D83D66C2334E71D15FEBBE24 118882~|~1~|~1~|~01/STR~|~Resurfacing SR 43~|~05 - 4R Maintenance - Resurfacing~|~6A5A3730ECE59B3D9F974F78D437ACA5D4946D23 118779~|~1~|~1~|~01/NFA~|~added split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8DD3B7B71C2B73CC3932D0281ACF761F539A8669 112950~|~1~|~1~|~01/STR~|~Rural Plan Split: PIC-159-0.00-9.41 PIC-207-0.00-9.57~|~05 - 4R Maintenance - Resurfacing~|~BBCDE577CD8248C9EE3C70841C0EA80011ABF547 116037~|~1~|~1~|~01/BRF~|~Replace SFN 2561100~|~10 - Bridge Replacement~|~66A01139238CAE1AC3B20914911B1A3D18DA15BE 93082~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing with asphalt concrete on AUG SR 66 11.86 to 12.72. Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~0E8F0FCE9453B8DEB7C540084664177768D869DD 93082~|~1~|~2~|~02/S>2~|~Pavement planing and resurfacing with asphalt concrete. AUG SR 66 12.72 to 13.22 Urban Paving Program.~|~05 - 4R Maintenance - Resurfacing~|~667DB7FFE921922609BCE52305B247D4758D8FD6 93082~|~1~|~3~|~03/STR~|~Resurface the existing roadway with asphalt concrete. AUG SR 66 13.23 to 22.41. This is outside of St. Mary's corp limit.~|~05 - 4R Maintenance - Resurfacing~|~AC48128D6A307F8807C85EAA648B60AAE7FEAAC5 121346~|~1~|~1~|~01/NFP~|~Created for TID Involvement~|~44 - Other~|~D1FA2BE75F1B5D30646331E2F99F2A7699916C21 124014~|~1~|~1~|~01/NFP~|~Created for J&C Task Order~|~~|~EACEEDD43986531116C07D3087364D333CBDB01C 123103~|~1~|~1~|~01/NHS~|~Plan split to program project, update during project scoping.~|~13 - Bridge Rehabilitation~|~F6B015ADAE6167EF627953EAC35252203BE052DF 100841~|~1~|~1~|~01/S<2~|~Slide Repairs - Locations TBD~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~80BF59CBFCFE5995341680DEFDD791C21E68D4ED 96889~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~~|~5927C6B040844ACE316728EB825FDEB62F4E4EB5 126398~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~2811E197F36F16D58C1259350147493470A49D5E 117876~|~1~|~1~|~01/NFA~|~Plan split for federally eligible construction items.~|~13 - Bridge Rehabilitation~|~C94A83212245F24154D104A8F2BA903BF78C0A1C 126758~|~1~|~1~|~01/SAF~|~Plan split for CEAO HSIP funding~|~21 - Safety~|~B2F5A0703C4EBDEA73EAF32608320E07C329E61B 90825~|~1~|~1~|~01/NFA~|~Install communications backbone to allow the traffic signals to operate as a closed loop system; upgrade old traffic signal controllers; install system and intersection approach detection for improved system perfomance; and puchase software package for remote monitoring of the upgraded system on SR 41 via the Traffic signal upgrade project. MIA SR 41 from SLM 10.90 to 11.95.~|~21 - Safety~|~956CBFB0CB4116DFD3EFD349216A7D32CEABAA6D 97213~|~1~|~1~|~01/NHS~|~Project to perform the following drainage work in Butler County. Pave invert with concrete for culverts BUT-129-2232, BUT-129-2258, BUT-129-2463R, BUT-129-2468L, BUT-129-2505, and BUT-129-2560. Replace/reconstruct portions of BUT-129-2178 that conflicted with sounwall post and pave invert or line remainder of culvert. Replace inlet concrete apron at BUT-129-2232.Replace a portion of HAM-4-3.65 and line with CIPP and reconstruct 2 catch basins.~|~44 - Other~|~E24104695C72AC2EBC9207382BC9F1402519288D 119646~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~C35BD7D71E4604FF38E8BD7F6102798356D1DD36 118687~|~1~|~1~|~01/S>2~|~Resurfacing STP > 200,000~|~05 - 4R Maintenance - Resurfacing~|~A250A27C111EA5CEAE6E2C2BB1C12038DF8D2C67 118687~|~1~|~2~|~02/STR~|~Resurfacing - Rural~|~05 - 4R Maintenance - Resurfacing~|~D2233F72CD155FBBFFD7956F969D68821BCADD7E 118687~|~1~|~3~|~03/CMQ~|~CMAQ - Construct northbound left turn lane at Schiller Road~|~21 - Safety~|~1672B166288C18BC0EF94837C5AE4654BFF8B522 118687~|~1~|~4~|~04/SAF~|~Safety improvements including shoulder widening, rumble stripes, and guardrail upgrades.~|~21 - Safety~|~1D198AF4B8D5E40AFA6D409CC15F2FC686325B75 107021~|~1~|~1~|~01/STR~|~LOR SR 511 0.00 to 13.41~|~05 - 4R Maintenance - Resurfacing~|~252079B5D795F2E35D4AFF0D02BCF7D6752C5FA1 113688~|~1~|~1~|~01/SAF~|~All work to construct the cul-de-sacs are in this plan split. Funds are from the safety program with funds needed is the estimate exceeds the safety program cap provided by the District.~|~21 - Safety~|~AEE559C20DD1FBEDB19F17047E68CAFEE57990E0 109008~|~1~|~1~|~01/ENH~|~Trans. Alternative Plan Split~|~28 - Facilities for Pedestrians & Bicycles~|~ED8A7B2B127DB61AF50B3ADD149989F06F2C0E5B 109789~|~1~|~1~|~01/NFP~|~Sewer repair work~|~44 - Other~|~0C84FF877D41E409B90DCB89EAA3D3D1112B148F 92415~|~1~|~1~|~01/NFA~|~Shawnee Preserve Reserve - Microsurfacing and striping of exisiting parking lot.~|~05 - 4R Maintenance - Resurfacing~|~BFB58BE01E61B62B63B631D35E7A24B1BC023D6C 93646~|~1~|~2~|~02/STR~|~Portion of project outside the Lima Urbanized area. There are no local funds in this split. All funds, both state and federal, are from the District Preservation Program budget. SR 115 from the Urbanized Boundary at 0.42 to the end of the project at 4.92.~|~05 - 4R Maintenance - Resurfacing~|~201FA5211B0D74512CB1777A5692AD2272649232 93646~|~1~|~1~|~01/S<2~|~Portion of project inside the Lima Urbanized area. Although inside the Urbanized area, this portion of the project is outside the the City of Lima. Therefore, there are no local funds in this split. All funds, both state and federal, are from the District Preservation Program budget. SR 115 from the beginning of the project at SR 65 to the Lima Urbanized Boundary at 0.42.~|~05 - 4R Maintenance - Resurfacing~|~46BF59E6FE1141CBA1407823BCB2D98DB8F651C2 126432~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items. ~|~05 - 4R Maintenance - Resurfacing~|~C976F3853B26038BEE30D9F05464CE9F82069BE8 116893~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B36DFEB1648D752A6AE9EC3CD77C068E1D0472D6 113471~|~1~|~1~|~01/BRO~|~CEAO funded bridge rehab of Harrisburg-Georgesville Rd over Big Darby Creek~|~13 - Bridge Rehabilitation~|~7BEB789A586B858974573887B3F7BBE541F621BC 113471~|~1~|~2~|~02/BRF~|~CEAO funded bridge rehab of Harrisburg-Georgesville Rd over Big Darby Creek~|~~|~193CB1EAC9E3BDCF59C2EACC5B7EB753A5BAD61B 94636~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split using MPO STP for the resurfacing of Madison Avenue.~|~05 - 4R Maintenance - Resurfacing~|~ADC2AB32CCE6DCDF63DF0DE51333C7E2BA8801FD 93799~|~1~|~1~|~01/STR~|~Replace Brdg 0103993Project Termini: Located 0.86 mile south of SR137 on SR247. Project Description: It is proposed to replace the dificient structure. 80/20 split01/STR/BR/State~|~10 - Bridge Replacement~|~464A2AE0429BD90A901BC6AB5D0A041325AC347D 91456~|~1~|~1~|~01/STR~|~Slide repair SR 800 1.97~|~44 - Other~|~2BF3B5D219AFB6B8B82ED2D74CFC7B6BD5582617 99782~|~1~|~2~|~02/NHS~|~Rebuild signal at Central and Marshal, Local will participate at 50/50 split.~|~21 - Safety~|~B2F6065719326156977CA8AEC54420F75159230F 99782~|~1~|~1~|~01/SAF~|~Plan split includes signal upgrades at Central Parkway and Liberty St and all associated work.~|~21 - Safety~|~0BD1C9693ADCB54AADBC3D9534B72B6ABAE6EEA7 114287~|~1~|~1~|~01/IMS~|~Mowing contract in D8~|~44 - Other~|~E97F097BF261BB8E67E438E6A73D1F2B4752C4B3 114287~|~1~|~2~|~02/IMS~|~Plan Split for mowing in D7~|~44 - Other~|~EF21E963B1CE4A19C8677345B8859090154F628C 110110~|~1~|~1~|~01/IMS~|~Rehabilitate bridges HAM-71-0226 that carries Elsionre Place over I-71 by painting, replace the drainage and vandal protection fencing and reconstructing the beam seat. Rehabilitate HAM-71-0294 that carries McGregor over I-71 by replacing the joints, Vandal Fence, and painting the structural steel. Rehabilitate HAM-71-0344 that carries Oak St over I-71 by replacing the bearings, joints, fence, and painting the structural steel.~|~13 - Bridge Rehabilitation~|~EBE38D1164E74FC810BF0D57DD81B99ED0EC44CC 125592~|~1~|~1~|~01/STR~|~Resurfacing SR 145~|~05 - 4R Maintenance - Resurfacing~|~71C13FC588701ECCA586AC45DB0E5B6B73FDD162 92642~|~1~|~1~|~01/MPO~|~mill & fill~|~05 - 4R Maintenance - Resurfacing~|~F8B61E82195DF7C7EB02851F38A961C6D841B749 97166~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 278 5.69, SFN 8201897. Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~32BFE4BB9DF2FB8650C09C0DCFEFCAF72D4679A9 108536~|~1~|~2~|~02/S5K~|~Resurfacing within the Marysville Urban Area. UNI-CR 133-4.48 to 5.18~|~05 - 4R Maintenance - Resurfacing~|~14AA9B6EBA54F5FD4157FA45753552B974F37EF8 108536~|~1~|~1~|~01/STR~|~Resurfacing outside the Marysville Urban Area. UNI-CR 133 0.00 to 4.48 and UNI CR 165-0.64 to 2.34~|~05 - 4R Maintenance - Resurfacing~|~18DEE44EB3B96F05BF6A64D7F888D970DBECE294 117976~|~1~|~1~|~01/NFP~|~Craig Memorial Bridge and Port Clinton Lift Bridge~|~40 - Special Bridge~|~8A69FF88AF575768C12295FCA88EF0166304EC91 116548~|~1~|~1~|~01/MPO/GRNT~|~Improvements to the intersection of Werk and Westbourne Roads.~|~21 - Safety~|~743E64B178F78DA147D6DABE96CFCF23784F5F3F 116548~|~1~|~2~|~02/NFP~|~Plan split for 100% GCWW funded utility work that is included in this project.~|~43 - Utilities~|~1470155415F847A040F1B7106F30483F919D731E 93049~|~1~|~1~|~01/MPO~|~Upgrade sidewalks and curbs~|~28 - Facilities for Pedestrians & Bicycles~|~55C56EEEA0E2E933F9BF830510B2D7A15845DE0A 102785~|~1~|~1~|~01/NFA~|~Landslide/Culvert repair project. MRG 607 0.76.~|~04 - Reconstruction - No Added Capacity~|~4B9DC37F82F5D2471038D5901F39568FB89B561B 110656~|~1~|~1~|~01/STR~|~All work to resurface the road is in this plan split. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~45C6B656A5C807442FA41B40316CD3DC2BAD6B1C 114318~|~1~|~1~|~01/IMS~|~Spot Repair on Interstate 71~|~05 - 4R Maintenance - Resurfacing~|~0797E465FA9AB2AC038C8DD88797A2948E53A4E9 110959~|~1~|~1~|~01/SAE~|~Installation of cable barrier. Funding is 100% federal funds from the Safety Program until the cap is reached then District Preservation Program funds will be used.~|~21 - Safety~|~DC259FEC75224B1389F499078D8EBF7A1BD8E6AA 18710~|~1~|~2~|~02/BRO~|~Rehab of BR eligible structure. SUM-SR176-1.06, also known as Broadview Road. SFN# 7707746.~|~13 - Bridge Rehabilitation~|~34CBE3954759FE812372B3820DF4F161EEC08F01 18710~|~1~|~3~|~03/BRO~|~Rehab of sfn# 7708858, SUM-IR271-2.94, also known Brecksville Road. Summit County, Ohio. Funded with District Preservation.~|~13 - Bridge Rehabilitation~|~4A725316A87D1063E0F70296D95299D0D42DAA39 18710~|~1~|~1~|~01/IMS~|~Total reconstruction of SUM-IR271, from SLM 2.33 to SLM 6.59~|~04 - Reconstruction - No Added Capacity~|~4BEFEF0A704EEF4697B147757136E7DD7DB16E2F 18710~|~1~|~6~|~06/IMS~|~Rehab of SUM-SR303-5.02 (SFN#770900). NOT BR eligible. Funded with District Preservation.~|~13 - Bridge Rehabilitation~|~5D8A438222FE69B76CA8A353D114AC7E48D2FBBC 18710~|~1~|~4~|~04/BRO~|~Rehab of three structures. SUM-IR271-3.54B (SFN#7708882). SUM-IR271-3.75L (SFN#7708912). SUM-IR271-3.75R (SFN#7708947). Funded with Major Rehab dollars.~|~13 - Bridge Rehabilitation~|~BA267C168DC6ECFF594B0FFB1A1406CA3D5AA3D6 18710~|~1~|~5~|~05/IMS~|~Rehab of three structures that are NOT BR eligible. SUM-IR271-3.54L (SFN# 7708815). SUM-IR271-3.54R (SFN# 7708890). SUM-IR271-4.83 (SFN# 7708971). Funded with Major Rehab dollars.~|~13 - Bridge Rehabilitation~|~E3EBA972F53BF5A2D6432101E62B36BB8AD46B10 103303~|~1~|~1~|~01/NFP~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~205E107BA170799D1DA92416D157D3B1B6704E49 115308~|~1~|~1~|~01/MPO~|~Resurfacing.~|~~|~90665E88CC9ADB2DB6B8AFE7B39F99EFF1DEF83E 98220~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - Crack sealing on various routes in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3C55EEDB60649EB497C68B16E7FDECD27E17758F 126732~|~1~|~1~|~01/MPO/WARR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~233C85DB015E719B90ACE6076FC9FA63AF514718 114640~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~CDFC37DFE21BA736CC2C3E730726B984AB81F2AD 98358~|~1~|~1~|~01/SAF~|~Replace signals at Broad St at Hague Ave and Sullivant Aveat Hague Ave~|~21 - Safety~|~2173CB2A1E7E6FB429136A9C54EF984FB87D5324 119826~|~1~|~1~|~01/NHS~|~Reconstruct roadway & construct sidewalks~|~21 - Safety~|~D320567E42662F43E9752AC9B280DAB01C55B00F 122391~|~1~|~1~|~01/NFP~|~This plan split is for the new CCTV cameras at all eight locations in District 11.~|~21 - Safety~|~919B59E8D327907C13F6E49A37F0C24DF2333725 122030~|~1~|~1~|~01/NFA~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D0173788FEBD1D70C2D828A1DB41323145CB4473 104417~|~1~|~1~|~01/MPO~|~plan split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C6C4DE3ADCF8D8EF8F4E5695C82F01FFB38AF0FE 88760~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~0B21EE9C4FA72E6B6AB6F530F3258ABC4EA3FC1F 88760~|~1~|~3~|~03/S<2~|~District Allocation/City Funds (waived). City of Galion Split Corp CRA-097-00.83 - 01.08. City contribution waived as per District Policy~|~05 - 4R Maintenance - Resurfacing~|~1AEB523E9C839056E86B21DF9242D99B09D90845 88760~|~1~|~2~|~02/S<2~|~Urban Paving - District Allocation~|~05 - 4R Maintenance - Resurfacing~|~E5CDC23993F43A977B5CC6A14C1BCAAF9BA30D18 88760~|~1~|~4~|~04/STR~|~100% City Funds (waived). City of Galion Split Corp CRA-097-00.83 - 01.08 City contribution waived as per District Policy~|~05 - 4R Maintenance - Resurfacing~|~F41DDCEAF5344EE730DB417EFED9FA689E3499C8 107675~|~1~|~1~|~01/STR~|~Resurfacing on SR 81 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~D0B6A2C8D15D916CB4B378A77ACDF62A0BA8242F 115479~|~1~|~1~|~01/NFP~|~Added a split~|~17 - Construction Engineering~|~0901DFA0AF1D1A92EF6E62F4E3C520C3965EB440 91626~|~1~|~1~|~01/STR~|~BRO SR 221 6.50 Slide RepairOn SR 221, project is 1.5 miles south of its intersection with SR125. It is proposed to repair the slide under Federal Declaration 2011-02. 100% state 01/STR/OT/State~|~44 - Other~|~0507BDAD414C413666414E90F2D412D1D72AEA15 88023~|~1~|~1~|~01/BRO~|~3502155 HEN SR66 4.82 Intersect: Tributary Of Brush Creek~|~13 - Bridge Rehabilitation~|~8A57E9B983624C8A926861BD3D82F4059948E9AC 92609~|~1~|~1~|~01/STR~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete on MER SR 118 10.39 to 13.42 from Corp Limit of the Village of Coldwater to Junction of SR 118 and SR 29.~|~05 - 4R Maintenance - Resurfacing~|~05CD5A4782C88AE83BA9D1BBD6E372D12E098974 92609~|~1~|~2~|~02/S<2~|~Pavement planing and resurfacing of the existing roadway with asphalt concrete in Coldwater. MER-SR-118 8.39 to 10.39~|~05 - 4R Maintenance - Resurfacing~|~350D5B06D4C075F8306CEC7CE295AB59317827EA 124823~|~1~|~1~|~01/STR~|~Bridge replacement project. MEG 681 10.31 (SFN 5303451).~|~10 - Bridge Replacement~|~31ECF9079CC3326D18912CC161DAFEF09367F684 116777~|~1~|~1~|~01/STR~|~MED SR 0094 19.93.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8CBB037CF05B7865EA8F0A5C44E35287D1502872 111479~|~1~|~1~|~01/BRF~|~Replacement of 5th Street Bridge (SFN 4460057). This is apart of the municipal bridge program.~|~17 - Construction Engineering~|~85849BD280253A1ADB9C5201F6E1330A609908C0 95186~|~1~|~1~|~01/NFA~|~Bridge replacement project. NOB 513 0917 (SFN 6104088).~|~10 - Bridge Replacement~|~D579E27FF84A11410FD4D41FBAE24106E5A89571 122140~|~1~|~1~|~01/NFP/STRU~|~Construct side path.~|~28 - Facilities for Pedestrians & Bicycles~|~6D381752C58DF5D40FF276DE7DFFF4AA7A8E66C2 83600~|~1~|~1~|~01/SAF~|~Plan Split for Urban Area for TRU CR 142 4.68 to 4.70 and TRU CR 328 2.77 to 2.79~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4351C302933F235452D7F6D18B729A0E8587053E 95137~|~1~|~1~|~01/NFP~|~Culvert repair work under I-480~|~44 - Other~|~515D85F0B60135548964518B361191777F96D657 117453~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes.~|~44 - Other~|~6B29DC23B55AA671B0780A13E43C38253E9B988B 123743~|~1~|~1~|~01/NFA~|~To provide a maintenance contract to maintain the highway lighting system for roadway lighting on the state-maintained highway system throughout District 11.~|~21 - Safety~|~EDD7BF2101889ECB24F67B019228BD08DF004836 81228~|~1~|~2~|~02/S5K~|~Resurfacing and related work along SR 821 in the village of Byesville. ~|~05 - 4R Maintenance - Resurfacing~|~77FFEFEC5D76777FAA3D599CA6827365C8F0ADCD 81228~|~1~|~1~|~01/STR~|~Resurfacing and related work along SR 821,146 & 265.~|~05 - 4R Maintenance - Resurfacing~|~8C8F7493C0FF14CBDBEFAB0E9B84A3200916E157 116286~|~1~|~1~|~01/NFA~|~Overlay project.~|~05 - 4R Maintenance - Resurfacing~|~E125C13C0E722034099DEE6BC702DCBCF5BBB3EA 116286~|~1~|~2~|~02/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~7CDA40B1E4B39D0F3565DE04956B37B5967D914B 110931~|~1~|~1~|~01/IMS~|~Construction of noise walls along MAH IR 680.~|~20 - Environmental Only~|~44E45AB6CFBAA14473206BE924E29B18DEBBF99F 125446~|~1~|~1~|~01/S5K~|~Culvert liner project. WAS 821 1.20, SFN 8405166.~|~04 - Reconstruction - No Added Capacity~|~F34B23BA25507F64AC13180A30BA9EBE0D5FE1AF 107506~|~1~|~1~|~01/STR~|~Resurfacing SR 147 from SR 9 to CR 4~|~05 - 4R Maintenance - Resurfacing~|~E9494A44ECC0EA5B08B007215E71C94C71C2F565 117074~|~1~|~1~|~01/SAF~|~All work in this project. Safety funds will be used until the cap is reached, then District Preservation Program funds will be used. ~|~21 - Safety~|~122D33B836BB79AB2708F42D6E88B573436BA9D0 95963~|~1~|~2~|~02/S<2/ZANE~|~District Preservation Urban Paving 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing with related work in the City of Zanesville Mus-146-(10.39-10.49)~|~05 - 4R Maintenance - Resurfacing~|~5424D48A8EF37DCC817D3B0CFD73BFA798CE6416 95963~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 7BPB (100% Bond) or 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comments - Resurfacing with related work on Mus-146-(2.21 to 9.93)~|~05 - 4R Maintenance - Resurfacing~|~F39631EC37B8DD746C088F8696D99D2FDCE8BD13 95963~|~1~|~3~|~03/S<2~|~District Preservation Funding 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Mus-SR 146-(9.93 to 10.39), Mus-SR 146-(10.49 to 12.20).~|~05 - 4R Maintenance - Resurfacing~|~84A7DC9A7DBB81AC440C81CE9EB51A411EDF7E4A 95963~|~1~|~4~|~04/STR~|~Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - Safety initiative to add Center line Rumble Strips. Mus-SR 146-2.21 to 9.93~|~21 - Safety~|~DE65756DA581499A0FEF4E62F9F4C0AA2B498338 95963~|~1~|~5~|~05/S<2~|~Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - Safety Initiative to ass Center Line Rumble Strips. Mus SR 146-9.93 to 10.39~|~~|~83589F1242E21499C20B015D7BF21273C7DFB2EB 113014~|~1~|~1~|~01/STR~|~ADA-770-3.45 SFN 0104469~|~10 - Bridge Replacement~|~E8EBE7B235073606CF3E8C9B77027A199D7542F7 91507~|~1~|~1~|~01/STR~|~General system resurfacing of SR-29: 10.71-13.00 and SR-41: 0.00-3.85~|~05 - 4R Maintenance - Resurfacing~|~9733C3DA5121B5D713F324CB152A9AB4540BF0FD 88912~|~1~|~2~|~02/STR~|~not BR Eligible: SFN 7804571 5.25 SR82 OVER MAHONING RIVER.~|~13 - Bridge Rehabilitation~|~8881F62FFECDD1B3D06D3EEBAB8ECAAF620F380B 88912~|~1~|~1~|~01/STR~|~Resurfacing SR 82 0.00-5.31 and SR 305 1.59-2.47~|~05 - 4R Maintenance - Resurfacing~|~E447C971554AA140D5311D18105D9CF5E2652B27 123308~|~1~|~1~|~01/IMS~|~Bridge repair project. Fiber wrap column.~|~13 - Bridge Rehabilitation~|~1580F3428B70693D869B662366C884D54035A7BC 125239~|~1~|~1~|~01/BRF~|~Complete bridge replacement utilizing 4R87 Federal funds at 95% up to maximum ($1,567,500).~|~10 - Bridge Replacement~|~231AB46ACDB1305711C954D6D1FA57F7D64CF047 102038~|~1~|~1~|~01/STR~|~Old State Line Rd~|~05 - 4R Maintenance - Resurfacing~|~05B9238F7ABD55AE7D17D1737D4BC2EE57773C34 124404~|~1~|~1~|~01/IMS~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B86BCC81B75AFB8A6BA8C3FC78AC68EB89089E4D 99661~|~1~|~1~|~01/STR~|~WOO-64 from SLM 10.10 to SLM 10.35~|~05 - 4R Maintenance - Resurfacing~|~9C7927CCEC46FB7F7B91D9BD569A68937CCE3018 87296~|~1~|~2~|~02/S<2~|~Resurfacing on SR 147 and SR 149 in the Bridgeport-Wheeling urban area~|~05 - 4R Maintenance - Resurfacing~|~08D02AFCE3FEAC2DBCA7B9C1B1F95865F7FD18DE 87296~|~1~|~3~|~03/STR~|~Resurfacing on SR 145~|~05 - 4R Maintenance - Resurfacing~|~1A86969DF91AB50C65B4EDE2DA172790484E791B 87296~|~1~|~1~|~01/NFA~|~Resurfacing on SR 148~|~05 - 4R Maintenance - Resurfacing~|~8D4EB7CFF86F1FC8004ACECD6001FB0FAF99533E 87296~|~1~|~4~|~04/NHS~|~Resurfacing of BEL-7 from SLM 0.00 to SLM 2.26 including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~B7418D13029EDD7A0E769F3688846EBE72EAB098 87296~|~1~|~5~|~05/S<2~|~Work associated with the water line repair on SR 147 within the Village of Bellaire.~|~05 - 4R Maintenance - Resurfacing~|~2699BD10E6DFC8F89D4E5015D4C090907D6B1FD7 107754~|~1~|~2~|~02/STR~|~All items of work associated with DEL-229-0.36, DEL-229-1.56, DEL-229-2.29 and DEL-229-3.25.~|~04 - Reconstruction - No Added Capacity~|~F169A7B390664C0A738394C676657AB788C44AA6 107754~|~1~|~1~|~01/STR~|~All items of work associated with DEL-229-0.93, DEL-229-1.49 and DEL-229-3.48.~|~13 - Bridge Rehabilitation~|~F6FC6FD85BF4F3F4D8D64B1D3A277759350CE644 100287~|~1~|~1~|~01/IMS~|~Double Microsurfacing to STA 77 from 9.50 to 11.84~|~05 - 4R Maintenance - Resurfacing~|~A68BB82BF3660DB8A653B1D8978865EFEA58A1EA 100287~|~1~|~2~|~02/S>2~|~Single and Double Microsurfacing to STA 687 from 0.00 to 0.36 and 2.57 to 5.52.~|~05 - 4R Maintenance - Resurfacing~|~7929D54C4BBADD3E5AEE77C1BF2B7F42D5B912B4 100287~|~1~|~3~|~03/IMS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~1D7BF6536EF6B554B2C96DCC2F08E9A70A920A00 95333~|~1~|~1~|~01/S<2/LCEO~|~"01/S<2/BR/LCEO" - Licking County Engineer Project - Replacement of twin culverts with new bridge structure. Project funding utilizing LCATS STP funding w/ a federal max of $158,851.~|~~|~E8046672B771D39E16FBD7743E4AF2B973B0694C 94202~|~1~|~1~|~01/STR~|~Resurface and perform pavement repair on all lanes of SR 748 in Butler County between SR 126 and SR 129. BUT SR 748: SLM 0 to 5.80~|~05 - 4R Maintenance - Resurfacing~|~F85A14A9F6A7DF4F6C6B198634B8D13103608D55 94202~|~1~|~2~|~02/SAF~|~Installation of flashing beacon by change order.~|~~|~1B9CA305F3453E958DD5F39AA71599A04D1818E4 112745~|~1~|~1~|~01/MPO/MOGA~|~Resurfacing in the Village of Mogadore.~|~05 - 4R Maintenance - Resurfacing~|~A99E8CDD5F8B5E641CF2793AB147F50B42BA7B20 112745~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~95375BAF32B68555D3B40CF64C8BB475FE58A424 110173~|~1~|~1~|~01/IMS~|~District Geological Site Management Allocation - 4SF7 (90% Federal) / 4SS7 (10% State) - See CAP Comment - Project for performing drainage work and slip repair along IR 70 embankment in MUS county.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DA28C14191A44AF6A6177B55305AE1688E532C4A 116344~|~2~|~2~|~02/S>2~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~CE21484E6E4AD2AE1FE5B717F5A0F9556698D58F 116344~|~1~|~1~|~01/NHS~|~CFN1844526 has been linked to NHS funding.~|~04 - Reconstruction - No Added Capacity~|~46CD34DEE71FC4DED08D395FBED2B64EE820C2D9 116344~|~3~|~3~|~03/STR~|~conduit 1864282 linked to stp rural plan split.~|~04 - Reconstruction - No Added Capacity~|~039EEBF40959AC6EFEBEE36B26358BF4A222D8FA 116344~|~1~|~4~|~04/IMS~|~plan split linked to SFN1305506~|~04 - Reconstruction - No Added Capacity~|~9A28B5929F69640F1D5849EE1F98DE0AAE3DF1ED 88882~|~1~|~1~|~01/S<2~|~District Allocation~|~13 - Bridge Rehabilitation~|~3087626A9E78BA20CE102EA62CB4E9D94AB5BFAD 96510~|~1~|~1~|~01/ENH~|~Safe Routes to School project. Add to existing walking path, install bike racks, install lighting along walking path and improve sight distance. Funded 100% federal.~|~28 - Facilities for Pedestrians & Bicycles~|~936D354993CCD4654F1D10E59B0D9D69E4AB7182 109778~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~5FC5BEF8E1FDDEB68071542C6EC3F65B56AEAFEA 109778~|~1~|~2~|~02/S>2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~0F18DA4DD2D93CA3F32E794FDB92D30CC0B2566B 109778~|~1~|~3~|~03/NFA~|~Resurfacing - not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~D6A1C053974B92C1060DAF40F1FBF0A1AC70300E 110498~|~1~|~1~|~01/STR~|~All work is in this plan split using district preservation allocations.~|~04 - Reconstruction - No Added Capacity~|~66A2A0056BE51642700B6410132769E9D0D29038 115287~|~1~|~1~|~01/NFA~|~created for J&C involvement~|~44 - Other~|~DB9DFF16407455CE28547D65ECC1566570CB1FD5 97362~|~1~|~1~|~01/NFP~|~Facility Renovation~|~44 - Other~|~5251A99CDF6FC5A175448EFAF32E6F521911D514 118053~|~1~|~1~|~01/SAF~|~Road diet on Harrison Ave from Kling Ave to Queen City Blvd including traffic signal rebuilds, pedestrian enhancements and resurfacing. ~|~21 - Safety~|~349A530B43A547749931B125C850A363C1B8E420 118053~|~1~|~2~|~02/SAF~|~use for replacement of retaining wall along walk, and any other item not eligible for Safety funds~|~66 - Resilience Improvement - Highway Project ~|~B272B8C1F35E7DBEBEEE22D2BC5E524BA4C14B3E 92071~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 2801809; GEA-422-1638~|~13 - Bridge Rehabilitation~|~D64264C1F090AE951ADC23E7C20A745A9FE6A298 108456~|~1~|~1~|~01/NHS~|~NHS SR 25 from 22.523 to 22.602~|~04 - Reconstruction - No Added Capacity~|~CE382D1BD07200248354F8ECFB18ED6F2E4BA83B 108456~|~1~|~2~|~02/CMQ~|~CR-801 from 0.00 - 0.196~|~04 - Reconstruction - No Added Capacity~|~B39DF35C48397BEB29B187B344A04115C255A09B 116575~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~2F66F325C652357D0B5D72874533B22022986249 123001~|~1~|~1~|~01/NFP~|~Spot paving on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~F68E4AB41D201E42264206D85DB312962458E60E 121936~|~1~|~1~|~01/NHS~|~Intersection improvements along US 62 at Beech Road and County Line Road intersections.~|~21 - Safety~|~146AEF75BE550DCDE1526D484B309C2F94AA51AB 103177~|~1~|~1~|~01/S>2~|~The project will construct a protected bike lane or cycle track in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~E4B06F40B364C8A30A7577C0E6BCE54A9AE118A1 90216~|~1~|~1~|~01/NFP~|~Local Park Roads~|~05 - 4R Maintenance - Resurfacing~|~109D631D16A54D4F78033DB7294FDB75B39BB65A 107482~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~8ED372ED8142FF3029BFD7A07476845229264FB3 122902~|~1~|~1~|~01/IMS~|~work for the sewer trunk line~|~01 - New Construction~|~49B062DF78B90AF4B141667C4F8ED690B0F74B53 122902~|~1~|~2~|~02/NFA~|~This plan split represents MSD design work~|~~|~57B03B721CE693DAA3DE71E5CD8901444B9557D9 91261~|~1~|~1~|~01/STR/Stat~|~On SR522, begin project 5.3 miles east of the Scioto County Line. It is proposed to repair the slip. Fed Dec. #OH11-02. 80%fed/20%state~|~44 - Other~|~CC07C5EAE00AAC955AD7CFA34BD62A896DB7218C 113620~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~2EBB949104F2D3196429E66FFD131F8E25D70F7A 114270~|~1~|~1~|~01/SAF~|~Construction of a modern roundabout at the intersection of Millikin & Morris.~|~21 - Safety~|~1BF08641D614A352F8E37ECFB9FE8B3CFC4B0C67 100462~|~1~|~1~|~01/STR~|~ROS 50 (11.27-16.85)~|~05 - 4R Maintenance - Resurfacing~|~FD35EBD2C18667FDA42C17E74F02BB9601A8BB64 100462~|~1~|~4~|~04/S<2~|~ROS 50 19.26 7103301~|~47 - Bridge Preventive Maintenance~|~D709C42028EEB4CFE4FEEC43EBA2DA065C2D0F6D 100462~|~1~|~3~|~03/STR~|~ROS 50 11.83 7103182ROS 50 14.99 7103247ROS 50 16.47 7103271~|~47 - Bridge Preventive Maintenance~|~3A926D13977159B03BB709E1F681378B42EE43B6 100462~|~1~|~2~|~02/S<2~|~ROS 50 (16.85-19.31)~|~05 - 4R Maintenance - Resurfacing~|~6D352F9F504BC3E4CA16C9C4481273AC483DE3AC 110574~|~1~|~1~|~01/STR~|~Culvert repair throughout the district.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AA3C44AE648CD86D9FB60F1A13410B12C3C1559A 93001~|~1~|~1~|~01/NFA~|~Major Rehabilitation Funds - 4MT7 (100% State) - No CAP - FDR (12") with related work on: SR 662 in Gue; Cos; Mus- counties at the associated locations.~|~04 - Reconstruction - No Added Capacity~|~EF9D36B26EB7A9FB217609A714D99C03D696CE5C 93001~|~1~|~2~|~02/NFP~|~District Preservation Bridge Funds - 4PS7 (100% State) - No CAP - Deck Sealing with related work on: SR 662 in Gue; Cos; Mus- counties at the associated locations.~|~47 - Bridge Preventive Maintenance~|~5A41DE9CD75E383EE9E9BA24AA4C55C706A6EE33 111950~|~1~|~1~|~01/S<2~|~2" Mill and Fill in the City of Urbana.~|~05 - 4R Maintenance - Resurfacing~|~E703322621A6DCC7EFCDA1B028A35C765418D0FE 25349~|~1~|~1~|~01/S>2~|~Remove bridge No. HAM-264-1044 (SFN: 3111547), over abandoned RR. Reconstruct roadway on new embankment.~|~40 - Special Bridge~|~698992C0F9433BDE5A0C71AD3B60DC7CC5C3B020 119818~|~1~|~1~|~01/NFA~|~Construct a multi-use trail from Alpha Rd. in Greenwich Twp. to Town Line 79 in New London Twp. also including trail surface improvement. ~|~28 - Facilities for Pedestrians & Bicycles~|~710F7040FEFD02F11D11AEA103D2AC5695C6A4B0 95635~|~1~|~1~|~01/IMS~|~LUC-75-3.01 bridge LUC-475-5.22 L&R Bridges LUC-246-5.84 Bridge~|~13 - Bridge Rehabilitation~|~B1C24520B04FCCD164E92742F401923A85FB2998 97724~|~1~|~1~|~01/IMS~|~Sporatic delamination correction on travel lanes on PRE-70 in both directions inthe travel lane only. The intent is to perform enough patching to hold the pavement until the FY2018 resurfacing project.~|~99 - State Preventative Maintenance~|~5B0AC9E123C9299F2BB3861EADB1824639BFED2D 117174~|~1~|~1~|~01/IMS~|~Split for paving work~|~05 - 4R Maintenance - Resurfacing~|~8E58DEA6CC8AA8C6D313CB4BA482BD8BABCFF085 99564~|~1~|~2~|~02/NFP~|~This is for items not eligible for urban paving.~|~05 - 4R Maintenance - Resurfacing~|~2B5D17A8D1C23F4D73F242BD79920859F1B1DB9B 99564~|~1~|~1~|~01/S>2~|~WOO-65 from SLM 22.43 to SLM 24.53. This is for urban paving eligible items.~|~05 - 4R Maintenance - Resurfacing~|~1A7E761DBBDB915060A529328AF61CF50FFE3565 112625~|~1~|~1~|~01/S<2~|~Landslide repair from OH19-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4F9985950F09449B48A1DFC90FD3AE868A490CC 90425~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~A92D4D04E8E475DE677EE0AD6184E9A47FA171CF 111530~|~1~|~1~|~01/MPO~|~TMACOG CMAQ funded items~|~21 - Safety~|~7A170FAD468E64D60485469F9BEC428BB4BE8396 120063~|~1~|~1~|~01/NFA~|~NEVI Round 2 270-A~|~63 - Electric Vehicles & Charging Infrastructure~|~6735C1B01403B952038FF5878DEF70C92F9564C4 92822~|~1~|~1~|~01/NHS~|~Pavement planing and resurffacing with asphalt concrete on AUG US 33 13.28 from SLM 13.28 (County Road 33 A) to SLM 16.53 (Bellefontaine Road)~|~05 - 4R Maintenance - Resurfacing~|~F27795F8F9534440A60FAC711B5BD6E176F6C618 108766~|~1~|~1~|~01/ERD~|~Pavement widening and resurfacing work eligible for the SAFETEA-LU (OH-86) earmark funding~|~03 - Reconstruction - Added Capacity~|~97187B2F6F588799DA7E9DE852E2A2BA803D0680 116487~|~1~|~1~|~01/STR~|~Culvert Repair or Replacement~|~44 - Other~|~71D59253C8191775A0235124EB73E0552676D235 93711~|~1~|~1~|~01/SAF~|~Safe Routes to School project with Genoa TwpCrosswalks, Hawk Signal, School Zone Signs, Bike Racks~|~21 - Safety~|~493366428DF786E1B5E5A5AD7736A541FE71055E 108509~|~1~|~1~|~01/STR/SAL~|~Landslide repair from OH18-01 ER Event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BA4C483D085E1C9AB418F4C9A071F67C8F158E05 126799~|~1~|~1~|~01/SAF~|~Install raised pavement markers on various routes throughout the District~|~21 - Safety~|~063119A050CA97F357447F1555A41C870E77386B 119052~|~1~|~2~|~02/NHS~|~All work on bridges classified as being on the NHS included in this split.~|~47 - Bridge Preventive Maintenance~|~64DB3617AF7153E391B0FA0E1F3216F1A0052E01 119052~|~1~|~3~|~03/S5K~|~All work on bridges under the STP 5,000-49,999 classification. ~|~47 - Bridge Preventive Maintenance~|~B4C6876FCFDA066511D84593BA44978371D85E44 119052~|~1~|~1~|~01/STR~|~All bridge work on rural classified bridges. SFN's 0200875 and 6302122.~|~47 - Bridge Preventive Maintenance~|~FC87947DB2B5BFB655ADEEB8404D2EF163002AAB 122820~|~1~|~1~|~01/IMS~|~plan split for the bridge work~|~13 - Bridge Rehabilitation~|~1150A4CA6E53AB84B26B857F631BC7148BB67C7F 102478~|~1~|~2~|~02/STR~|~Resurfacing of TUS-93 and TUS-212~|~05 - 4R Maintenance - Resurfacing~|~6CA0C182D3CC8BFAAED0784D68CABADACEEF7EC3 102478~|~1~|~3~|~03/SAF~|~Centerline rumble stripe items on US 250 and SR 21~|~21 - Safety~|~5F11B4AB709BBE30DCEDCFE4BB934D6ED281EF68 102478~|~1~|~1~|~01/NHS~|~Resurfacing TUS-250, TUS-250I and TUS-21~|~05 - 4R Maintenance - Resurfacing~|~1887569D5794B059222CD04C318E19F977FF5EAD 102478~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~2EC165154990D778872900FE35766A3A164BBC7C 91829~|~1~|~1~|~01/ERD~|~100% federal earmark id OH062 using Toll Revenue Credit.~|~44 - Other~|~444DF3ED400F9FC14669B66C2D5F589CAE5A5FAE 97909~|~1~|~1~|~01/ENH~|~US 35 from Edwin C. Moses Blvd to Wayne Ave - this project will replace existing high pressure sodium lights with LED lights and install sidewalk lighting at the Edwin C. Moses Blvd, Perry Street, Ludlow Street and Wayne Avenue underpasses of US 35.~|~44 - Other~|~29543119A01E04E15AC9F3E341EF60F22156C18E 117977~|~1~|~1~|~01/NFP~|~Plan split for bridge operations~|~40 - Special Bridge~|~4330D691AB706D84A444AC6D5BF2CF810BF046A6 90566~|~1~|~2~|~02/NHS~|~Retroreflective sign replacement on Federal Aid streets in the City of Marietta. NHS routes funded 80/20% federal/local.~|~44 - Other~|~44FABFF677F6328A92BE61AB6C54432CD5EF43C8 90566~|~1~|~1~|~01/MPO~|~Retroreflective sign replacement on Federal Aid streets in the City of Marietta. Federal (MPO)/Local 80/20%.~|~44 - Other~|~95F83ED51F056EFC99D44A4AA5B69D9AF525F52F 123158~|~1~|~1~|~01/IMS~|~Resurface with Fine Graded Polymer Modified Asphalt~|~05 - 4R Maintenance - Resurfacing~|~CE7C886F01558539046FD50F38FA0C826B1B6551 110853~|~1~|~1~|~01/SAF~|~Replace full access intersection with RCUT.~|~21 - Safety~|~3DC1FBF56B217594D391CB91981D52170FACC79F 91413~|~1~|~1~|~01/BRO~|~Brdg replacement. 4402588 LAW SR141 16.18 Intersect: Long CreekWest of SR775 an SR141 intersection.80 Fed/20 State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~A0CEE5DC10563F86496C295A6429A974D946B472 93854~|~1~|~1~|~01/S>2~|~Raising roadway profile to correct drainage and flooding issues. Includes extensive earthwork. In the City of Streetsboro, Portage County, Ohio.~|~44 - Other~|~05385033F73F81195509E24FBA10F19BE090B129 93854~|~1~|~2~|~02/S>2~|~Replacement of SFN# 6704352, POR-SR303-0.70 structure, in the City of Streetsboro, Portage County, Ohio.~|~10 - Bridge Replacement~|~84DC4304BFE8C8CE700192576C99F25BC4C4C0F8 93854~|~1~|~3~|~03/S>2~|~Reconstruction of railroad crossing on western edge of project.~|~~|~24E5AB6CFC0696002EDC0D7B5AB2A5937F386854 94439~|~1~|~1~|~01/IMS~|~Bridge Deck Replacement~|~13 - Bridge Rehabilitation~|~707589651FCD44C5D28F3B8FF8350298C1825286 111597~|~1~|~1~|~01/S<2~|~resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A23CB7AF0F60644744C580209D7B387B6D10158F 100098~|~1~|~1~|~01/S>2~|~100% federal participation utilizing Toll Revenue Credit to repair and resurface East 93rd Street.~|~05 - 4R Maintenance - Resurfacing~|~BFAD989D8B185CDDF346B6C5922BB6320EB56646 100098~|~1~|~2~|~02/NFP~|~100% City participation for items not eligible for any other funding.~|~05 - 4R Maintenance - Resurfacing~|~51AB8B3CAE5C13ADC9A85A1D566BF51FA022C782 123301~|~1~|~1~|~01/STR~|~Encase deteriorating piers on several bridges~|~47 - Bridge Preventive Maintenance~|~C7E8B2000707BF5E21F43FB5518888210B5F7DBA 87372~|~1~|~1~|~01/STR~|~Replace bridge with deficient deck and substructure with minimal approach work on SFN 7500904 SHE 48 0202 over Klase Ditch.~|~10 - Bridge Replacement~|~BC0A166587ABA3B35A9FD7711C78F82EC699CEF6 119940~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~~|~4CFF6E9FA5C31DEC9331607939BC9E411B69267A 104912~|~1~|~1~|~01/NFA~|~Black River Schools school bus replacement~|~44 - Other~|~6E60F86B66324288CF5B99B2EFECC71371C0548A 110789~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A2439C9BA43848FEE5582C10533C589AEBACEFB 121899~|~1~|~1~|~01/SAF~|~Construct sidewalk along SR-48. ~|~21 - Safety~|~91220D15D7FCEC8C26B852C25219BAA7DFE16CA0 121899~|~1~|~2~|~02/MPO~|~construction of sidewalk along Butterworth Road from SR48 to Dorsey Lane~|~28 - Facilities for Pedestrians & Bicycles~|~36D0EF20F75BAFCF6EABD1003B1C51D90277E51D 119928~|~1~|~1~|~01/IMS~|~Plan Split 01/IMS/OT~|~21 - Safety~|~5C444C812AEBA88A619E7208814D7E71FD623B53 95991~|~1~|~2~|~02/STR~|~Plan Split 02/STR/BR/ - District Bridge Preservation Funds - 4PF7 (80% Federal) / 4PS7 (20% State) - No Cap~|~13 - Bridge Rehabilitation~|~1D8739E4449C462BAAD1764B8F94605AC3091736 95991~|~1~|~1~|~01/STR~|~Plan Split "01/STP/PV/" - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - for Kno-36-(29.49-35.87).~|~05 - 4R Maintenance - Resurfacing~|~883B801E83EE170773D3E98848EF87DF2A393D65 106184~|~1~|~1~|~01/NFA~|~Metro Parks - site improvement to provide a driveway, parking lot and walking trail - Mad River Gorge.~|~44 - Other~|~4F76B25CCAE62313461108EA8AA644159A681E6B 80960~|~1~|~1~|~01/ERD~|~100% federal earmark id OH165 using Toll Revenue Credit.~|~28 - Facilities for Pedestrians & Bicycles~|~10AC17E8D71410DD7F4EA694BFC37E0360674DF4 103305~|~1~|~1~|~01/NFP~|~Split for pavement work~|~05 - 4R Maintenance - Resurfacing~|~4C9BC34A7E4062A9AD9C6B79CADB97EF49D26A4B 100216~|~1~|~1~|~01/NFA~|~TID is constructing the Eastgate South at Clepper Lane Roundabout Project~|~01 - New Construction~|~92E3124563BB1B33A786AAF0E5424183FEF24ED5 97425~|~1~|~1~|~01/STR~|~Plan split for culverts~|~04 - Reconstruction - No Added Capacity~|~7390907CE40D5001E8795D42F20E85A1EE410BEE 102057~|~1~|~1~|~01/SAE~|~Funds in the Construction Contract subphase from the safety program. 90% federal funds 4HJ7 and 10% state funds SAC 4BC7. Funds in the Construction Engineering subphase are also 90% federal and 10% state but not from the safety program.~|~21 - Safety~|~78D15D55062E027E0F4ECDEC04D182FC20867670 101851~|~1~|~1~|~01/IMS~|~Bridge repair project on various bidges within the district to include patching, rebuilding and sealing elements of the structures.~|~13 - Bridge Rehabilitation~|~7D9BC736F43D15971B9700E873B925C5B8C48FC1 101851~|~1~|~2~|~02/NHS~|~Bridge repair project on various bidges within the district to include patching, rebuilding and sealing elements of the structures.~|~13 - Bridge Rehabilitation~|~6A82180CF0FB64DC5DB7B64CCBB9C7E644255FE1 101851~|~1~|~3~|~03/S<2~|~Bridge repair project on various bidges within the district to include patching, rebuilding and sealing elements of the structures.~|~13 - Bridge Rehabilitation~|~D9EFAEEB42A9EDF6C314BC390A95AC2BF3F70551 101579~|~1~|~1~|~01/S<2/JEFC~|~DSR# JEF-014~|~04 - Reconstruction - No Added Capacity~|~79FCB9FB793524FCF82BAEA26B00B149C9FB7C5C 94340~|~1~|~1~|~01/STR~|~From SLM 5.03 to SLM 13.01~|~05 - 4R Maintenance - Resurfacing~|~ADD070DEAA35E936A172AADADC4A1444E39F5D6A 94340~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~EE8E260A442A87E40AF54C712BA68B0B302A1D9A 125497~|~1~|~1~|~01/NHS~|~All work included in this split.~|~21 - Safety~|~C7D6C60C5007FAEF8810CBB026B4365F50AE0D35 109369~|~1~|~1~|~01/NFP~|~ODNR St. Mary's Fish Hatchery chip-seal resurfacing~|~05 - 4R Maintenance - Resurfacing~|~73D1163B574DFC4533B444EAE8C7F71A9BC7932A 95211~|~1~|~1~|~01/NHS~|~Landslide along SR 7 in Belmont county at the North end of Shadyside at the end of the on ramp from Shadyside. NHS route SLM 13.75~|~04 - Reconstruction - No Added Capacity~|~5D0F3A22BB2FE11742920FAE2D25AFA8586B2353 120680~|~1~|~1~|~01/SAF~|~added plan split 2 priority 1~|~04 - Reconstruction - No Added Capacity~|~B4D25EAE0E1E7BA742B7E39AF621DCA4FD67602A 114213~|~1~|~1~|~01/IMS~|~Recessed wet reflective PM~|~~|~5D1BBFD9DF79740BC18B3C89429D9AB29D72F94B 90259~|~1~|~3~|~03/NFP~|~This is for the section from SLM 2.22 to SLM 2.95 for all items not eligible for Urban Paving.~|~05 - 4R Maintenance - Resurfacing~|~6674B26C431502B3ED6563CF3FE5297A4006F789 90259~|~1~|~1~|~01/SAF~|~A safety funded project to improve Byrne/Dorr/Secor intersections.~|~21 - Safety~|~EA284EA916804553BF345E37112378655A75063E 90259~|~1~|~2~|~02/S>2~|~This is for the urban paving of Dorr St from 2.22 (Secor) to 2.95 (Douglas).~|~05 - 4R Maintenance - Resurfacing~|~FB8D7C7484048AEBC5C440D2B36E0016A7605935 95934~|~1~|~1~|~01/NFA~|~Canton City School District~|~44 - Other~|~D9633476F80092F32AAF64FE896EAB1F43F4B399 88575~|~1~|~1~|~01/S>2~|~Pavement planing and resurfacing on SR 48 from 18.14 to 19.10. Poplar Street to the South Corporation Limit of Clayton.~|~05 - 4R Maintenance - Resurfacing~|~7D0D2E564EBE8C6830CA9EBA0543EBE439948F4F 110502~|~1~|~1~|~01/IMS~|~Split for bridge painting over the interstate~|~47 - Bridge Preventive Maintenance~|~E5DDAE7B5DB801A13716C8513A89560C6203459A 121138~|~1~|~1~|~01/STR~|~Resurfacing SR 152 from SLM 21.96 to SLM 25.84~|~05 - 4R Maintenance - Resurfacing~|~D46B644850E79813AE26658BE00894D593E4534F 121138~|~1~|~2~|~02/S5K~|~Resurfacing SR 152 from SLM 25.84 to SR 7~|~05 - 4R Maintenance - Resurfacing~|~F83D6E8C3F707ACB5D77BEBF297FA20013463E9B 107290~|~1~|~2~|~02/NHS~|~Spot paving on FAY US 35~|~05 - 4R Maintenance - Resurfacing~|~932712BB2347B0665DF030777AE75986699D8057 107290~|~1~|~3~|~03/IMS~|~Minor repairs on five structures~|~13 - Bridge Rehabilitation~|~D6266D5A391B0BECD31DAAA2A356C3AE7375B77C 107290~|~1~|~1~|~01/IMS~|~Spot paving on FAY/MAD IR 71~|~05 - 4R Maintenance - Resurfacing~|~59CC2C556EF1ED8147B596E0C2C64EC1EB2612F4 108401~|~1~|~1~|~01/NHS~|~Landslide repair from OH18-01 ER event.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5D7FCF7C6A50830B127906D16A1E98EE855FF9A4 100882~|~1~|~1~|~01/CMQ~|~Reconfiguration of the existing SR-741 intersection with Kings Mill Road and Parkside Drive. SR-741 will become the through movement. The southwest approach of Kings Mill Road will intersect SR-741 at a signal controlled T-intersection. Parkside Drive will be cul-de-sac'ed west of the intersection.~|~21 - Safety~|~0A977B528D74E824E87A52A99E858E6D7691EF68 92781~|~1~|~1~|~01/SAF~|~Guardrail upgrade/replacement project funded by CEAO. Various sections of CR 18, CR 20 and CR 33A in Meigs County. Funded 100% federal.~|~21 - Safety~|~5BF6E2CA8974E9F1FFAF069C6D307C7B017127E3 124789~|~1~|~1~|~01/SAF~|~Sign replacement~|~21 - Safety~|~3818D652BD7F09CE787F6AF3BA3D1F2C1252BD22 104000~|~1~|~1~|~01/BRO~|~Plan split for all bridge work~|~13 - Bridge Rehabilitation~|~3AE9060157269543A40165E24530A4656FC631A1 104000~|~1~|~2~|~02/NFP~|~Split for 100% local funding for items of work not eligible for federal participation.~|~13 - Bridge Rehabilitation~|~E774947A538A850E6684470272A17D6DBAD2EBED 104000~|~1~|~3~|~03/NFP~|~Plan split for Crown Castle utility relocation work~|~13 - Bridge Rehabilitation~|~BB09507398F8026C299A33B327C9D49D5E609C6E 104000~|~1~|~4~|~04/NFP~|~Plan split for CenturyLink utility relocation work~|~13 - Bridge Rehabilitation~|~B6708AD07528F7A6C751E72BEC7DF578DAC98E5D 104000~|~1~|~5~|~05/NFP~|~Plan split for Windstream utility relocation work~|~13 - Bridge Rehabilitation~|~03478E65A192DADCBD1505A12E94907828BB214B 104000~|~1~|~6~|~06/NFP~|~Plan split for Charter utility relocation work~|~13 - Bridge Rehabilitation~|~B4AA807757AA70126C61D02D184C211FDDB50A59 106293~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit Counties.~|~~|~77DD1D59E0C63BE705D4C38D8AEA051961B587E5 108270~|~1~|~1~|~01/SAF~|~Intersection Improvement on NHS route in the City of Fairfield.~|~21 - Safety~|~9A1B241BC98F4E88894477BA78FD61CF99A733E4 108270~|~1~|~2~|~02/SAF/FAIR~|~Covers 100% local cost (alternate bids for City preferences and paving of parking lot associated with an acquisition parcel).~|~21 - Safety~|~30A85DB7AA70D237FA50C12C67665BB548A021E7 126603~|~1~|~1~|~01/MPO/MCDO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A453FB14C2393ACAC2F0FCACED75206F257D9687 116822~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~AB2F909C30860D250A2DA743A5653892DF099027 116822~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9D60122F3DC0E5F96EE9B5223BD1833518E6E50C 116822~|~1~|~3~|~03/STR~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~1A6D35240261327EC8BFE6921CE227F59096EEB9 104256~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~B87BB8C33F15CE827004F33C25AC70DCC1382629 87216~|~1~|~1~|~01/BRF/MCEO~|~"01/BRF/BR/MCEO" ? County Engineer?s Association Organization (CEAO) Bridge Program 4B87 (Federal 80%) / 4BG7(TRC 15% / Local 5%) ? CEAO CAP of $605,150.00 for Construction Phase ? Credit Bridge CAP of $74,205.00 - Bridge replacement of SFN #6032184 MUS CR45 01.80 Intersect: Manns Fork Salt Creek: BR Eligible for Replacement Length=53' SD/FO(1) SR=17.4 DSR=6;~|~10 - Bridge Replacement~|~5650EA4400722FF9670450A7C7D255A6900610E0 122837~|~1~|~1~|~01/NFP~|~replacement of superstructure~|~13 - Bridge Rehabilitation~|~5D2A64FAC1D22580216FFCA431CCBDA9CC9C4F0F 113274~|~1~|~1~|~01/SAE~|~Pedestrian Safety Improvements at various locations in the City of Dayton.~|~21 - Safety~|~9CF27B828F97D7BA2F2874234001F2CE6D1EA179 100541~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads~|~21 - Safety~|~AB0574E6A92DB254CF3649A4755094DDF7A9D058 123829~|~1~|~1~|~01/STR~|~Conduits FY31.~|~04 - Reconstruction - No Added Capacity~|~2577C077E6745C80CB6240BC537BD262BB7CAD7C 109713~|~1~|~1~|~01/STR~|~AC overlay without repairs Resurfacing of the Miami County Garage.~|~05 - 4R Maintenance - Resurfacing~|~DDD43A8F496BB7BCC2C7C2A01CF087A98250AB60 108380~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 513 0.75-0.79. NOB_NF_0002. Not on the federal aid system funded 100% ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2A6181F119EB61DDD73600532F454E7F651DB42B 108380~|~1~|~2~|~02/NFA~|~Resurfacing project using an asphalt overlay treatment. NOB 513 0.00-1.00. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CDBD9883D7C3B68EF548B333B234B920788BCEDE 97979~|~1~|~1~|~01/SAF~|~FY2020 District wide raised pavement markers.~|~21 - Safety~|~936240489606A616B8CFF634FF00D434C931D14D 94434~|~1~|~1~|~01/STR~|~Bridge - Major Rehabilitation~|~13 - Bridge Rehabilitation~|~588FF14DE1F969073DF676232AABFE9C77055BCA 114405~|~1~|~1~|~01/NFP~|~Miscellaneous charges not attributable to a specific PID~|~17 - Construction Engineering~|~4F5FAD172248425BD1B8CBE1CF6C5E82A6FCFC8A 100759~|~1~|~1~|~01/NHS~|~Resurfacing project on MOE SR 7 2.21-5.40 using an asphalt overlay with repairs treatment. NHS Federal 80% and State 20% funded.~|~05 - 4R Maintenance - Resurfacing~|~96AD525CC75E6DB71132F99E710A1C61AF356D63 14522~|~1~|~3~|~03/IMS~|~100% Local funding for signalization work.Phase C.Reference Items 54-55; 59-61; 63-64; 72.Local Sponsor - City of Columbus.~|~21 - Safety~|~3794809E61EDED45BB9A5C3DE8F4720042380C3E 14522~|~1~|~2~|~02/S>2~|~100% STP funding for signalization work.Phase C.Reference Items 51-64; 72.Local Sponsor - City of Columbus~|~21 - Safety~|~590779966A8E611D7495726333C4476CC7439E68 14522~|~1~|~1~|~01/CMQ~|~100% CMAQ funding for Signalization work,Phase C.Reference Items 1-50; 65-71; 73-102.Local Sponsor - Columbus~|~21 - Safety~|~BA8BE44ED09C5EED1DA9DA23E8BA7DDE3EC72A23 100834~|~1~|~1~|~01/IMS~|~Bridge maintenance~|~~|~8AD7EB4187E1D52630D903B576DAC513075656F7 100834~|~1~|~2~|~02/S<2~|~Bridge Maintenance~|~~|~463BC76DA686F4143C8BD63FAA00EFD18CCCA5CC 114071~|~1~|~1~|~01/S>2~|~Bilstein Boulevard Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~949915285D2FE8D1A13097C08999B549993E7A08 123754~|~1~|~1~|~01/IMS~|~Interstate plan split.~|~05 - 4R Maintenance - Resurfacing~|~297C4522C43586BAB470E32E7F788F4065D8367D 98112~|~1~|~1~|~01/BRF~|~Rehabilitation of the existing truss Bridge No. PRE-TR 333-0002 (SFN: 6831729), which carries Brower Road over Seven Mile Creek, including repairs and/or replacement of substructure, superstructure, and deck components~|~13 - Bridge Rehabilitation~|~C2F23834AE8DEE0107E1262D86D85B9CCB7ABF6F 87261~|~1~|~1~|~01/NHS~|~Concrete pavement repair project. ATH US 33 17.99-26.71. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~AF3856815E4B41DF64F02ED4A92338B259608DF5 116445~|~1~|~1~|~01/NHS~|~Districtwide signal repair/maintenance.~|~21 - Safety~|~094257804507A1E098E3AFB856AFE6D9F352157D 116445~|~1~|~2~|~02/S>2~|~Signal replacement.~|~21 - Safety~|~4FF338714AFAA72A538C53D80087FF532EC77448 108825~|~1~|~1~|~01/S<2~|~"01/S<2/OT " - 60% Federal (4PF7) and 40% State (4PS7) - construction engineering costs.~|~17 - Construction Engineering~|~F84E38C7BD2023EE8FEC6DA2E2CD8923078E735F 102420~|~1~|~1~|~01/NHS~|~MAH SR 616 from 4.89 to 5.41.~|~05 - 4R Maintenance - Resurfacing~|~7260B23265D8C987747936C0DF76F48F802A774A 102420~|~1~|~2~|~02/NHS~|~MAH SR 616 from 5.41 to 8.88 Northbound.~|~05 - 4R Maintenance - Resurfacing~|~9171BB146EF59FA07C2C69278E20108390E2CE66 102420~|~1~|~3~|~03/NHS/YOUN~|~MAH SR 616 from 5.41 to 8.88 Southbound. Urban Paving within the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~053DDBE76F534329450410726B0EF7CA52E7C97A 103273~|~1~|~1~|~01/MPO~|~Resurfacing of Lower Bellbrook Avenue from Colorado Drive to Maumee Drive including replacement of deteriorating curb and curb inlets.~|~05 - 4R Maintenance - Resurfacing~|~B27A6D999FB09D2B453382A922B69B54A08D6674 99924~|~1~|~1~|~01/BRO~|~CEAO funded bridge rehab of Campbell Rd over Columbia St Ditch~|~13 - Bridge Rehabilitation~|~42D732E4BB2780BFED031A8D24BCD9469DFEC2DE 122177~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-70-B~|~~|~BD4F141BE9165DD92684EB675E76E74D52B2E433 123640~|~1~|~1~|~01/NFP~|~Plan split for repair, replacement or maintenance of state-owned traffic signals.~|~21 - Safety~|~6B7D1819C7AB4C424CD59C597A9C2C62E64962C8 87145~|~1~|~1~|~01/NHS~|~Joint repair and diamond grinding on MOT US 35 10.32 to 13.85 (Dayton) from the Junction of SR 49 to Dearborn/Abbey Avenue.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~378E2F1DC1EBFEF4FEDDC28E3F01503BB9A1F055 124825~|~1~|~1~|~01/NFA~|~Bridge replacement project. VIN TR 34J 1.50, SFN 8233756.~|~13 - Bridge Rehabilitation~|~6F05F9934010A56A75578FE42A88C4CD228E16D8 112550~|~1~|~1~|~01/IMS~|~Plan split to program project. Update as part of Plan Split Review process at plan file.~|~47 - Bridge Preventive Maintenance~|~66710324AE98F573CA6438746A3112B2DB3FF90C 111624~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark and Summit counties.~|~21 - Safety~|~02CFE7629695F36E409800213CDFD7EF18A32836 122783~|~1~|~1~|~01/SAF~|~Intersection safety ~|~21 - Safety~|~6122BFFD1C3342717B103BC5E8E1A29FD970496F 105333~|~1~|~1~|~01/NHS~|~Highway Lighting on Roadway classifications starting with "N"~|~44 - Other~|~9CD46A1A2A0D71A0A4C1E0AB5822F833F651D1CD 105333~|~1~|~2~|~02/IMS~|~Interstates not in Cities. All Roadway classifications starting with and "I".~|~~|~5F179F83750C4CE59E7F94483CDB0044FDBA9FB1 108510~|~1~|~2~|~02/NHS~|~Mine grouting under JEF-7-33.80 pier.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C9C525FBA67E81255E055F82B5596D608AF8D60 108510~|~1~|~1~|~01/NHS~|~Repair the bridge carrying SR 7 over the Railroad and another bridge carrying SR 7 over the Railroad and Yellow Creek. This plan split will also be used to protect the bridge from scour.~|~13 - Bridge Rehabilitation~|~6FB70E9F5B75C0B03D461B4449413AC8E9890FB7 86641~|~1~|~2~|~02/S<2~|~Marion urban area and general paving (D6 federal/D6 state)SR-309: 18.88-20.26Asphalt OL on SFN 5101735, MAR-309-19.02 over Grave Ck02/S<2/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~22CBE6912BC274B12F8340CF799CA048DB14A5AD 86641~|~1~|~4~|~04/S<2~|~80% Marion Large City funds and 20% local funds for pvmt repair and curb ramps within city of Marion04/S<2/PV/LGLC~|~05 - 4R Maintenance - Resurfacing~|~2486B187D9F42292E94D1307937366ADC16515C2 86641~|~1~|~1~|~01/S<2~|~Marion urban area and City o Marion urban paving (D6 fed/local)SR-309: 17.57-18.88SR-4D: 1.03-1.1901/S<2/PV/F_LC~|~05 - 4R Maintenance - Resurfacing~|~328AE6C8F7C2A549F777940B6BCF8892538ABBE5 86641~|~1~|~3~|~03/STR~|~Rural func class area and general system paving (D6 federal/D6 state)SR-309: 20.26-22.52Asphalt OL on SFN 5101751, MAR-309-21.80 over Fooscroft Ditch03/STR/PV/F_ST~|~05 - 4R Maintenance - Resurfacing~|~C718ECD55669026FD205A839F85AE47CB7F827AE 119354~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8095A9AA8BDC4920419ECA3522F3282796F50CD2 110251~|~1~|~1~|~01/NFA~|~Slide repair between C.R. 427A and S.R. 7~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7B890BBB7D5BB6B5BECBEB03C0BD3DFADB155AC3 99297~|~1~|~1~|~01/BRO~|~Work related to overlay and repair of SR53 structure over US23. Includes slope flattening and guardrail replacement between the ramps at the interchange.~|~13 - Bridge Rehabilitation~|~415E76FAA6651BC509D517BD7E6CC64035B18FDB 91047~|~1~|~1~|~01/MPO~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~1022A383FA0C8DF094367431EFABD72CFF675C4F 91047~|~1~|~2~|~02/S<2~|~100% Local CE, over NOACA cap, per R. Lane on 12/18/13.~|~05 - 4R Maintenance - Resurfacing~|~52F012C9B6FB75F91C2B52A5951323A1801A6832 102577~|~1~|~1~|~01/STR~|~Bridge replacement on MAD-62-2.80~|~10 - Bridge Replacement~|~61D06BCEE237735294D8DEE1FA84A0513BFBA645 89160~|~1~|~1~|~01/BRF~|~"01/BRF/BR/ " - County Engineer's Association Funding 4B87(80% Federal) / LNTP(20% Local) - CAP = $424,800.00 Federal dollars - Replacement of 6046142 MUS CR40 3.11 Intersect: Symmes Creek; BR Eligible for Replacement: Length=31 SD/FO(1) SR=18.8 DSR=4~|~~|~390E55ECAB4205D06759797A5ED03BF559F0F7E4 112932~|~1~|~1~|~01/NHS~|~NHS Plan Split: FRA-104-104-8.18-12.98~|~05 - 4R Maintenance - Resurfacing~|~C8B18BFF269A08F06D5E066BF821A7BFC032EC04 112648~|~1~|~1~|~01/NFP~|~This is the district's systematic RPM replacement maintenance contract of prismatic reflectors that have lost reflectivity or are in need of replacement.~|~21 - Safety~|~BA0284F843585284F14699CA6AE2459851927FF3 97628~|~1~|~1~|~01/STR~|~Emergency Type B pavement repair. MOE 26 5.59-14.68, MOE 379 4.57-6.05, MOE 536 2.42-5.00, NOB 146 8.50-17.87, NOB 147 3.50-16.95, NOB 285 0.24-4.90, 5.55-14.47, and NOB 566 0.00-1.59. Rural other federal aid funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~0FC637D2A387CAABD2213CE448C70ABA5367842F 97628~|~1~|~2~|~02/NFA~|~Emergency Type B pavement repair. MOE 379 0.00-4.57, 6.05-8.07, MOE 724 0.00-1.30, NOB 260 3.75-14.35, NOB 513 0.42-9.18, NOB 566 1.59-4.80, and NOB 724 0.00-2.75. Not on the federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~B0B653369CAF16F034952CF4B18844572A6A9957 110928~|~1~|~1~|~01/SAF~|~Construction of sidewalk on the south side of E. Baldwin Street from N. Broadway Street to N. Columbus Street. Application of crosswalks and installation of signage.~|~28 - Facilities for Pedestrians & Bicycles~|~DBC064D1C7AFDC7FCAB72DC3E7C8FBD6677ACDFB 125048~|~1~|~1~|~01/NHS~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9EFB529166CC92A91F7EECC8EBD09324D42EB959 122195~|~1~|~1~|~01/SAF~|~Sidewalk and pedestrian project in Jackson.~|~21 - Safety~|~47E07BCCC9EE4524AE8815AE76A0D8BA2AF81C1E 81662~|~1~|~1~|~01/S>2~|~Resurfacing work on US 22 in the Village of Silverton. Will include minor curb repair, curb ramps, pavement repari, planing, and resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~798E2B00B6454E0300C5290FFAA17039CB2230F4 95677~|~1~|~1~|~01/S>2~|~Indiana Ave from I-75 to Washington St~|~05 - 4R Maintenance - Resurfacing~|~6A19600666CE83C5BF8246DB0C256CBCC064A3B3 102926~|~1~|~1~|~01/NHS~|~NHS bridge~|~13 - Bridge Rehabilitation~|~D44516019E1E409CD7E0BF019EE1C2ED0370C3FC 102926~|~1~|~2~|~02/STR~|~STP Rural bridge.~|~13 - Bridge Rehabilitation~|~6AA34BFE183BCAF9784CBC9C723E12C11CD52493 91266~|~1~|~1~|~01/STR~|~On SR522, begin project 0.39 mile west of SR93. It is proposed to repair the slip. Fed Dec. #OH11-02. 80%fed/20%state~|~44 - Other~|~954488419BD479DE8CE5E1053F7EFE4AB69948A8 95547~|~1~|~2~|~02/SAF/NEWA~|~"02/SAF/OT/NEWA" - Local Safety Project 4HJ7 (Federal 90%) / 4BG7 (Local 10%) - Project CAP $75,000.00 Federal Funds requiring a 10% Local Match - OFAH/Urban Signal Upgrade at: Location 2 Lic-CR 132-1.88 (West Main Street) at 30th Street (CR 802); This is the second priority for funding.~|~~|~099336A5A62997A3301C6B04C013A4491EAC13D1 95547~|~1~|~1~|~01/SAF/NEWA~|~"01/SAF/OT/NEWA" - Local Safety Project 4HJ7 (Federal 90%) / 4BG7 (Local 10%) - Project CAP $75,000.00 Federal Funds requiring a 10% Local Match - NHS Signal Upgrade at: Location 1 Lic-SR 16-23.74 at Dayton Road (CR 260); This is the first priority for the CAP Priority~|~21 - Safety~|~1B5E24153DAA99FF734BB6277A12BFA5BD1E2948 108894~|~1~|~1~|~01/STR~|~LOR-83-0.00 to 2.61 MED-83-4.26 to 12.77~|~05 - 4R Maintenance - Resurfacing~|~D2E3E2AE3E151D2F211FFA1983D55D9521FE9E99 108894~|~1~|~2~|~02/SAF~|~Microsurfacing various intersections on LOR-57/20~|~05 - 4R Maintenance - Resurfacing~|~A182A20614D0947245CD3A7E798AC39930400F58 105388~|~1~|~1~|~01/STR~|~Smooth seal on rural routes: CHP US 36 SLM 22.33 to 29.05~|~05 - 4R Maintenance - Resurfacing~|~50B270310E83C517CC20FB1F7C72A74B7ADB92E3 108006~|~1~|~1~|~01/NFP~|~District 3 is paying for Plan Split 1 Costs. ERI SR 0002-Lighting Upgrades and MED SR 0057 Light relocations.~|~21 - Safety~|~9E198D96F91D1FE475684A3301C0FF168F105830 108006~|~1~|~2~|~02/NFP~|~District 2 is paying for Plan Split 2 Costs. OTT-SR-002 27.00-27.78- 42 Mongoose LED lights, 16 conventual LED lights~|~44 - Other~|~323C783B5216BC6DB653D14AEB427979A3DA1264 104788~|~1~|~1~|~01/BRO~|~Replacement of the Brighton Approach Bridge over Central Parkway (SFN: 3101533) in Cincinnati, OH.~|~10 - Bridge Replacement~|~A33F15ECF2CAAFEDBDC2421086FFDAB8842BB849 124421~|~1~|~1~|~01/STR~|~Intersection improvement~|~21 - Safety~|~03D662ABAE59CC5DDFBE3EEB11F7699DB6E825B3 117672~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~939424C5B4657A0743C6E55873926E708C25F1B1 114712~|~1~|~1~|~01/NFA~|~FAY 729 0964 replacement~|~10 - Bridge Replacement~|~3DC289487AA48AC6A520B27DD4F3C2A55F5E8B92 92604~|~1~|~1~|~01/NHS~|~Microsurface US 33 in Auglaize County:AUG US 33 SLM 16.92 to 23.07~|~05 - 4R Maintenance - Resurfacing~|~7B0D2DC3924D8090FA797C69896E4F91C2AE1842 107284~|~1~|~1~|~01/NFA~|~ODNR Bridge project in Shawnee State Forest~|~47 - Bridge Preventive Maintenance~|~BB257868C040B3B81EFD5B152633DA4101D26F6F 93037~|~1~|~3~|~03/S<2/LANC~|~District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Urban Paving Resurfacing on Fai-SR 188-11.45 to 12.85~|~05 - 4R Maintenance - Resurfacing~|~27562CD05F5E17E89DDCE52900A81A1D397EAD11 93037~|~1~|~4~|~04/SAE/LANC~|~Safety Funding - No CAP - 100% Safety (4HJ7) - replacement of signal poles and mast arms at intersection of US 22 and Memorial Drive.~|~21 - Safety~|~B690D8406031AA8AE71A453BB7AE274DD626F427 93037~|~1~|~5~|~05/S<2~|~Local Funding - No CAP - 80% Federal (4TA7)/20% Local (4BG7) - replacement and upgrade of signal equipment at the intersections of SR 188/US 22, US 22/Zane Avenue, and SR 188/Pierce Avenue. Work will also include drainage and curb work on SR 188.~|~44 - Other~|~15ECCDABDF9F6A6A954E4C2DAF5D9876028DCE4B 93037~|~1~|~1~|~01/NFA~|~District Preservation 7BPB/4PS7(100% State) - CAP (See CAP Comments) - Resurfacing with related work on Fai-SR 188-00.00 to 08.73~|~05 - 4R Maintenance - Resurfacing~|~AE0331839F3FC694C702B53AC37867A29FEE1CA0 93037~|~1~|~2~|~02/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-SR 188-08.72 to 11.45~|~05 - 4R Maintenance - Resurfacing~|~F99EEE85CED1318AFC786806FD3114A9D70B1EDB 93037~|~1~|~6~|~06/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - berming operation with related work on Fai-SR 159-0.00 to 6.75~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~635CFC65261C427795695FA3DCE04F485D9D26A3 100831~|~1~|~1~|~01/STR~|~Rehab Bridge CLI SR 380 8.27 over Buck Run by painting the exisiting weathering steel and overlay the deck.~|~~|~B761C3CCA7C6EDEA056609717D7DC2FD5322B105 119143~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 13.98-19.11.~|~03 - Reconstruction - Added Capacity~|~87418B19FDBD9A2A7179DA3957F84FD719F1F5F6 119143~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 13.98-19.11. Work on the existing lanes. ~|~04 - Reconstruction - No Added Capacity~|~7064A934B1410A10C814B05667D13748B0C9A77A 109333~|~1~|~1~|~01/NFP~|~ODNR culvert lining project at Kiser Lake State Park~|~44 - Other~|~AB9482B16AC66379F07279D4303323C0529E84B7 114877~|~1~|~1~|~01/S>2~|~STP>2 plan split.~|~05 - 4R Maintenance - Resurfacing~|~9222C730EB18A3A642614A77DA5D2004147F62CA 87259~|~1~|~1~|~01/STR~|~SCO SR348 0.00 - 6.23 Resurfacing Project On SR348, begin project at the Adams County line (SLM 0.00) and terminate ar SR73 (SLM 6.23). It is proposed to resurface the roadway with asphalt concrete.Pave Thru Brdgs: 7305303 SCI SR348 0.29 Intersect: Liston Run 7305346 SCI SR348 2.57 Intersect: Br Of South Fork 7305389 SCI SR348 3.28 Intersect: Adkins Run 7305397 SCI SR348 4.02 Intersect: Canada Run80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~2361B2004A70DD33EADC7A52DA7D732856935B48 87259~|~1~|~2~|~02/STR~|~SCI SR348 0.00 - 6.23 Resurfacing ProjectBegin at the Admas County line and terminate at SR73 Brdgs for rehab:7305338 SCI SR348 1.81 Intersect: Beech Creek7305435 SCI SR348 6.01 Intersect: N Fork Scioto Brush Crk80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~5D0F9093BE6FD2B4B68FD16490CFF56F3AFC77E3 95706~|~1~|~1~|~01/SAF~|~Safety/local funding to extend Gemini Pkwy from I-71 to worthington Rd~|~01 - New Construction~|~0BB802F5C57B2CE4031DA3A4196DBEB281CF65CE 95706~|~1~|~2~|~02/SAF~|~Items not eligible for safety funding~|~01 - New Construction~|~A267FE0836829E8B33F309EE0953EBB79DC70F9F 121325~|~1~|~1~|~01/NHS~|~NHS plan split.~|~05 - 4R Maintenance - Resurfacing~|~164E789AEC450EC8168D94D213863BBAA0CA3709 108011~|~1~|~1~|~01/NHS~|~Lighting~|~44 - Other~|~4CA0651158117CC797E2E226D7FC90E02AF7BAE0 84860~|~1~|~1~|~01/BRF~|~"01/BRF/BR/HOL" - CR 22 8.61, located 0.65 mi E SR 3; replace bridge over Lake Fork of Mohican River; minor relocation to improve horizontal curvature.~|~10 - Bridge Replacement~|~D7B5439844442ED4659D8C64A8754A83F07ECD55 98338~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Guardrail Upgrade on OFAH-Rural: Cos - SR 79~|~44 - Other~|~E685B5A1BB860E95C1250B7D3A5A4D2DF252D80A 110913~|~1~|~1~|~01/NFP~|~Creating Plan split for J&C Involvement~|~44 - Other~|~2D2C5DBD8E02A59F5DBD1095F2E2C89FD7FA5908 123204~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~3437C728BA3B9F65DB6FCED6F0D7942A99136696 102471~|~1~|~1~|~01/STR~|~Minor Rehab of COL-45 from SLM 22.04 to 22.13~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~43ABBF6539E5352A15DDD4B7C7681E814FB14C83 102471~|~1~|~2~|~02/S<2~|~Minor Rehab of COL-45 from SLM 22.13 to 23.29~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CEB59AD776B0EC3A5D1F7A9599EF99151B9F9C33 102471~|~1~|~3~|~03/NHS~|~Minor Rehab of COL-45 from SLM 23.29 to 26.91~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0DAC0940EBE5FB6246A7198B5C6370E45064E924 121079~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~97F8522E38625FA2EAD3471AB8B8BC4B167CAB49 121079~|~1~|~2~|~02/S5K~|~STP 5000 Plan split~|~05 - 4R Maintenance - Resurfacing~|~14D0A3B7F4D43F348DF1B0E09B08C8CCD104F36B 116273~|~1~|~1~|~01/NFP~|~Created of J&C involvement~|~44 - Other~|~4690CBFAD27A8BFF861CBFD3FECC232A19CAF69D 111322~|~1~|~1~|~01/SAE~|~Guardrail project on various routes in Ross County.~|~21 - Safety~|~72CBE2AADF30DD0302E91CBA23884E624EDFBC60 100509~|~1~|~1~|~01/STR~|~Resurfacing of CAR-9 and CAR-43~|~05 - 4R Maintenance - Resurfacing~|~EEC2A8E83CDC2D3F93415D1812FAD75CA022CB5B 116450~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 800 over Stillwater Creek. Scour protection will be added, in stream work will be required.~|~10 - Bridge Replacement~|~5855971E87D433B8A7E7FBB717D10E692F922857 106725~|~1~|~1~|~01/STR~|~Resurfacing SR 799 from SR 800 to CR 21.~|~05 - 4R Maintenance - Resurfacing~|~146B02F9A8FED04AEC589DC6EF1635B3EE7A0F77 116446~|~1~|~1~|~01/NFP~|~Districtwide systematic signing upgrades/replacements.~|~21 - Safety~|~792EE3655C5D8EF218631F08577E697C2EF8442F 122303~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E5A98CE82D907D9431C57664262D8262E08032B0 106368~|~1~|~1~|~01/STR~|~Bridge rehab on rural bridges.~|~13 - Bridge Rehabilitation~|~2CC16D7A18E3B99881679AF49817FCD260BFD237 102456~|~1~|~2~|~02/NFA~|~Asphalt Resurfacing of the ODNR Barnesville Office parking lot.~|~44 - Other~|~8D2231CE1BFE99BC2E00F82B1ACA0A7156FD5422 102456~|~1~|~1~|~01/IMS~|~Asphalt resurfacing of IR 70 from the 0.00 to 5.04~|~05 - 4R Maintenance - Resurfacing~|~B0E9845A129F7DE931DF502AEA568A17D50D4C25 87904~|~1~|~1~|~01/IMS~|~Split for median barrier replacement~|~44 - Other~|~7C9AFF8EFC048CFCF291C2E8971AB3B713AF8D71 117553~|~1~|~1~|~01/NFA/JACK~|~Add sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~3EA9826E6C9A41A54A23AE789C469F2F5CDB9DE8 109772~|~1~|~1~|~01/STR~|~AC overlay~|~05 - 4R Maintenance - Resurfacing~|~D40C198CAC92EDA5CA8A46B489DE961F5D6D089B 75316~|~1~|~3~|~03/IMS~|~1203576 CLA-70-0156 work includes some structure removed, joint seal replacememt, and some patching concrete structure.1203630 CLA-70-0173 work includes patching the concrete structure.1203754 CLA-70-0265 work includes some structure removed, surface course, joint seal replacement, and patching concrete surface.1206567 CLA-70-0310 and SFN 1206575 CLA-70-0312 work includes wearing course removed, surface course and joint seal replacement.1206478 & 1206451 CLA-675-0061 L/R work includes portion of structure removed, patching concrete structure and polymer modified asphalt expansion joint system.~|~13 - Bridge Rehabilitation~|~5632EF6AA5435D8F1ECD06B814242E1CF3FC14E7 75316~|~1~|~1~|~01/IMS~|~Planing and resurfacing of the existing roadway and other roadway related items on CLA IR 70 from SLM 0.50 to 6.28 (segment length 5.78 total lane miles 33.02) and on CLA IR 675 from SLM 0.00 to 1.60 (segment length 1.60 total lane miles 5.00). Minimal bridge work (Patching concrete structure as well as deep joint sealer) on SFN 1206567 CLA 70 3.10 and SFN 1206575 CLA 3.12.~|~05 - 4R Maintenance - Resurfacing~|~78D6EB91D0265780A503BAED6B5CED4E6E8AAEEB 75316~|~1~|~2~|~02/IMS~|~Pavement markings and RPM removal and replacement on; CLA -IR -70 1.050 to 6.280 CLA -IR -675 0.000 to 1.600 CLA -IR -70 0.500 to 1.050 FR 0.51 MI E OF THE CLA/MOT CL TO THE SRAN INTERCHANGE; FR THE GRE/CLA CL TO THE JCT IR70.~|~05 - 4R Maintenance - Resurfacing~|~AB980D712F86CF5D1C9EBC29A5CEAF46DDC1C84E 75316~|~1~|~4~|~04/STR~|~SFN 1252305 (OC 000) CLA-CR335-0027 (CLA-675-0160)-work includes wearing course removed surface course and joint seal repair.~|~13 - Bridge Rehabilitation~|~E4F207C89079BDF3E86256C5A16F08E1C0573CD7 87724~|~1~|~1~|~01/NHS~|~Concrete Joint and Slab Repairs CRA-30-0.00 to 4.07. Bridge Maintenance included.~|~04 - Reconstruction - No Added Capacity~|~D5F117A6D3752DBA20C8C03260275320D8F4D1BE 87724~|~1~|~2~|~02/BRO~|~Bridge work.~|~47 - Bridge Preventive Maintenance~|~AB5623B143C168CA1A56F58C9AD8621D9CC678BE 105259~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~04 - Reconstruction - No Added Capacity~|~FAA3FB13D9D66B1F34FFCBAD653E9F59F5494A6F 123603~|~1~|~1~|~01/NHS~|~Rehabilitation of culverts in D5.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C4776614B9D592892060D65770644F2F270DC887 115688~|~1~|~1~|~01/IMS~|~Split for interstate resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B85CCC29FA48A69DBCD63F34D0F74ACA4DAD3BB3 115688~|~1~|~2~|~02/NHS~|~Split for SR-2 resurfacing~|~~|~8E8E4F506AE63221CB1BEFB197A7B1541A4025F0 111485~|~1~|~1~|~01/SAF/HAS~|~Pavement marking on various county routes with 100% 4HB7 CEAO Safety funds~|~21 - Safety~|~0B6CBDD8BF6C5E63CA5E22EBCD4149DFF2C526CB 81942~|~1~|~1~|~01/STR~|~Bridge Replacement~|~13 - Bridge Rehabilitation~|~B06E8AB5F237DC90655E3FD670A87B50D2EDEF6D 107956~|~1~|~1~|~01/NHS~|~HEN-6; HEN-24~|~05 - 4R Maintenance - Resurfacing~|~1D19B7A3EB91B6131A95FA699005A8A4DB5E31E8 89055~|~1~|~1~|~01/NFA~|~Reconstruction of proposed 2 lane section with C&G on both sides and on street parking on both sides. Lane widths will be 12' with 8' parking lanes on each side of the street on East Auglaize Street from Wood Street (SR 67) west to Broadway Street at the RR tracks.~|~04 - Reconstruction - No Added Capacity~|~40AB717354529C1F048AC327CCA96EBA8C718188 89055~|~1~|~2~|~02/ENH~|~8' sidewalk consisting of 5' concrete and 3' bridge will be instlled on both sides of the street. Driveway approaches will be reconstructed. Project also includes water main replacement and upgrade to 12" plastic on East Auglaize Street from Wood Street West to Broadway Street at the railroad tracks.~|~31 - Landscaping & Other Scenic Beautification~|~A67CDCF0AEE39D05735E3DB85F0AF329B1D991FB 119579~|~1~|~1~|~01/NFA~|~added plan split.~|~44 - Other~|~0D8CE9C8C0D7FFB1DC00E21984593D310E7C1CBD 76377~|~1~|~2~|~02/NHS~|~Bridge work on 4 structures (not BR eligible):5100577 MAR US23 7.86 Intersect: Over Sr529-02795100607 MAR US23 7.86 Intersect: Over Sr529-02815100666 MAR US23 10.06 Intersect: Over 95 17895100690 MAR US23 10.06 Intersect: Over 95 1791~|~05 - 4R Maintenance - Resurfacing~|~11506A4124735D99355F494F24BD0710FE84B7BE 76377~|~1~|~1~|~01/NHS~|~Priority system paving of MAR-23: 2.42-10.63~|~05 - 4R Maintenance - Resurfacing~|~C90141CAFB878DC468E8ED39CB020FF7D4CC9463 76377~|~1~|~3~|~03/BRO~|~BR eligible bridge work on 2 structures:5100518 MAR US23 7.65 Intersect: Grave Creek5100542 MAR US23 7.65 Intersect: Grave Creek~|~13 - Bridge Rehabilitation~|~FED552583E1A61B29B7E649B71110F9F54D6A414 112951~|~1~|~1~|~01/NFP~|~Guardrail Maintenance~|~21 - Safety~|~56883D18419F12BF142DC76EE160261FA333A0E9 112951~|~1~|~2~|~02/SAF~|~Guardrail replacement within the Village of New Alexandria~|~21 - Safety~|~E3677B6DD1D42F9FF29B0550FFA727C4479EF877 96644~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a fine graded polymer treatment. MRG 266 0.00-7.62, 8.97-13.86. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~10A017540F31A7324058DC6DC0F395ABC7ADD5DB 100310~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay of TRU SR 45 from 12.90 to 13.39.~|~05 - 4R Maintenance - Resurfacing~|~0D70058A543AD9D371F7BEF56884DC9F5135A509 100310~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay of TRU SR 45 from 13.39 to 13.55.~|~05 - 4R Maintenance - Resurfacing~|~33DF5DCA1F037B1FBCEF2F30413B5C40126E00E8 100310~|~1~|~3~|~03/STR~|~Fine graded polymer AC Overlay of TRU SR 45 from 13.55 to 21.14.~|~05 - 4R Maintenance - Resurfacing~|~AA486D1FE935F359CE6ED352C501915C909DCB6C 106355~|~1~|~1~|~01/S<2~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~AA6E2DFE4172731F125C61FDDEDB215BD60E9125 93229~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BHF funds. 4306317; LAK-608-0337~|~13 - Bridge Rehabilitation~|~22B29AE6FAF2D43ACE92DD9377B7B51A01B53398 114950~|~1~|~1~|~01/STR~|~Bridge Replacement.~|~04 - Reconstruction - No Added Capacity~|~A7515D6A029057CF60B3DB6DB58861DB6877011A 115138~|~1~|~1~|~01/STR~|~Repair or Replace culverts~|~~|~B701AF88FC71C6CCC19DFAAF0E927B5B872BA334 115138~|~1~|~2~|~02/NFA~|~Repair or Replace culverts~|~~|~6CBE025BCCA68687AF824C65C76429D61E9392DD 101972~|~1~|~1~|~01/BRO~|~This split covers work on the two overhead structures.~|~13 - Bridge Rehabilitation~|~0CD593B70742E17A468A262B2C4AC0070D6878A2 101972~|~2~|~2~|~02/IMS~|~Plan split to cover bridge hit damage repair activities only.~|~40 - Special Bridge~|~17DD59BC5A7BE7CA78E47520A7466FF0D13276D6 107547~|~1~|~1~|~01/STR~|~Resurfacing COL-517~|~05 - 4R Maintenance - Resurfacing~|~04F86E974F6FE3420F237206D975CF3DB4C54B8B 92478~|~1~|~1~|~01/IMS~|~Construct a Type II noise wall on west side of I-270 from West Broad St north to RR tracks SLM 7.04-7.81~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B2B96374C87CC4880510378EFAF63587A17B6C7 109399~|~1~|~1~|~01/IMS~|~Installation of partial tower lighting at IR90 and SR7 interchange in Ashtabula County.~|~21 - Safety~|~A461197B3DD9E3AB2294196AD7B19660FA971564 107148~|~1~|~2~|~02/BRF~|~Plans Split for Yarrow St Bridge~|~10 - Bridge Replacement~|~A9449B0A4AF959403D2F45600836B1C85420DE06 107148~|~1~|~1~|~01/BRO~|~Plan Split for Seaman Rd roadway and bridge items~|~10 - Bridge Replacement~|~CE8007FE0D0AC7B7806044FF264D1955C3F451B9 76382~|~1~|~3~|~03/NHS~|~4 NHS structures (not BR eligible):2101084 DEL US36 15.05 Intersect: Big Run2101092 DEL US36 15.05 Intersect: Big Run2101114 DEL US36 16.74 Intersect: Alum Creek2101122 DEL US36 16.74 Intersect: Alum Creek~|~05 - 4R Maintenance - Resurfacing~|~14908573752710EE62BDB57F26090F83B8437D2F 76382~|~1~|~2~|~02/STR~|~Non NHS (STP) resurfacing portion of DEL-36: SLM 18.45-28.61~|~05 - 4R Maintenance - Resurfacing~|~8B34890B3B1298F11C65AF5BF5E9374B790675C8 76382~|~1~|~1~|~01/NHS~|~DEL-36 resurfacing on NHS portion - SLM 12.83-17.64~|~05 - 4R Maintenance - Resurfacing~|~F3B20BBCFF5FEA60E2796F5732AD20F105CAECC4 76357~|~1~|~3~|~03/NHS~|~D6 NHS 80/20 fed/state funding for minor work on 9 bridges:2508737 FRA-104-8.182508761 FRA-104-8.522508796 FRA-104-9.292508826 FRA-104-9.422508893 FRA-104-10.582508907 FRA-104-11.092508982 FRA-104-11.54L2508974 FRA-104-11.54R2508931 FRA-104.12.77~|~13 - Bridge Rehabilitation~|~3D12EA8C781992FB8583244E90593813C4021ABC 76357~|~1~|~2~|~02/NHS~|~D6 Fed/state funding for minor rehabFRA-104: 8.02-13.17~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~92A836190EA6A1E42058B22857DBB65DC232E0E5 76357~|~1~|~4~|~04/NHS~|~Pavement Markings & RPMs 100% State~|~21 - Safety~|~A8FC006DDE3BAAE20E957837A3C36B556092C868 76357~|~1~|~1~|~01/S>2~|~STP Pavement 80/20 fed/stateFRA-104-7.96-8.02~|~05 - 4R Maintenance - Resurfacing~|~AA1DF64860F7A489801E5CC539895BCCFE90C079 95863~|~1~|~1~|~01/NFP~|~@ SLM 4.16, 5.67, 6.50, 8.46 and 9.15~|~04 - Reconstruction - No Added Capacity~|~6741171D0528FF9E14F8FE05A1B36AD8BE8AC261 98420~|~1~|~2~|~02/NHS~|~HUR-224-0.00-4.6 Resurfacing~|~17 - Construction Engineering~|~18E8155992CB816458187D004F3D2AD376AD1841 98420~|~1~|~1~|~01/STR~|~HUR-224-0.00-4.6 Resurfacing~|~~|~6202CF75360EE34246563ED545023F64967A478D 107149~|~1~|~1~|~01/BRF~|~bridge split~|~10 - Bridge Replacement~|~9316803C42DB587BD566C74EF07B4B968AB47843 95761~|~1~|~1~|~01/NHS~|~Plan split for resurfacing US-23 & US-6~|~05 - 4R Maintenance - Resurfacing~|~3EF4FE637BB61B3CD4E8FE160533AAA901441AA2 112659~|~1~|~1~|~01/MPO~|~Split for MPO-funded eligible work~|~05 - 4R Maintenance - Resurfacing~|~BF6034910653E58B6E62A383614E372584FA8437 118436~|~1~|~1~|~01/STR~|~Rehabilitation of LIC-37-18.94 (SFN 4501810)~|~13 - Bridge Rehabilitation~|~9DBD7D28EE3935C702ADD6682E9FFD80D0B996A7 120191~|~1~|~1~|~01/MPO~|~Plan split for federally eligible items in construction & inspection~|~05 - 4R Maintenance - Resurfacing~|~4E2DC04A1AEE16EAD852EE49693736E9E5A0BA31 98993~|~1~|~1~|~01/NHS~|~Miami~|~01 - New Construction~|~6CBB4BF66E96426AD5986AF5971427B52B598371 98993~|~1~|~2~|~02/S>2~|~non NHS route~|~01 - New Construction~|~F2900B190DF21FABFDB7C8E3A72D15875865AB53 88675~|~1~|~4~|~04/NHS/MED~|~Resurfacing - NHS Segment - MED-042-17.05 - 17.68~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CA626F10AB3DB383DFDE5A6C1456FCE9ADCB8595 88675~|~1~|~1~|~01/S<2/MED~|~Urban paving - 80/20 - District Allocation/City of Medina~|~05 - 4R Maintenance - Resurfacing~|~DE0DBD39356FC4DDC0A87316856F1F2A6420C9BB 88675~|~1~|~3~|~03/S<2~|~District Allocation 80/20 Fed/State~|~05 - 4R Maintenance - Resurfacing~|~E966DB457B337EB0A99D36619E4E244E8FB5CAED 88675~|~1~|~2~|~02/S<2/MED~|~100% City of Medina~|~05 - 4R Maintenance - Resurfacing~|~FCC7C0BFDA959A7A076AE16DBC5FDE3F8DE78B3A 96585~|~1~|~1~|~01/NHS~|~101 G microsurfacing purchase order contract. GAL 35 6.70-7.40. NHS route funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~C26955C73D69E9328B84C8601805856CB7203907 123245~|~1~|~1~|~01/S5K~|~Crack Seal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2D0C481B5F16C77957434E9E80F492379458FB08 94957~|~1~|~1~|~01/NHS~|~SFN 7403011~|~13 - Bridge Rehabilitation~|~63F1E483BA35355B6FF93D8F8B0263D85323B85B 122151~|~1~|~1~|~01/BRO~|~Partial bridge removal. ~|~13 - Bridge Rehabilitation~|~C584C3D54CE0FF26F07EB41AD43045560A14CD36 125907~|~1~|~1~|~01/IMS~|~establish pro rata percent~|~44 - Other~|~B0DE0BE5D33BACC6C01EE73CF67CF4306C5DB1CE 116236~|~1~|~1~|~01/S<2~|~Overlay project in LAW.~|~05 - 4R Maintenance - Resurfacing~|~D1EFF613B8846C9FB20C0FD7C7C196C31F2EE793 116236~|~1~|~2~|~02/NHS~|~Added plan split.~|~05 - 4R Maintenance - Resurfacing~|~78ABF116C87D35582323BB25BD52512F8B9DEC5C 116236~|~1~|~4~|~04/NHS~|~added plan split.~|~47 - Bridge Preventive Maintenance~|~536782586A52009D0207EA69840EBA9528A7F588 116236~|~1~|~3~|~03/S>2~|~Added plan split.~|~47 - Bridge Preventive Maintenance~|~254CEC75A236B4236D2408B0E0637C3CABD239CB 95880~|~1~|~1~|~01/NHS~|~The project is for replacement of Bridge HAS-250-0543 (SFN 3401596).~|~10 - Bridge Replacement~|~822AD18239EF8257B2DF092C075789DCC7A7AE29 112293~|~1~|~1~|~01/STR~|~Bridge Repairs~|~13 - Bridge Rehabilitation~|~D643EDDCADF051F07418E6273F351A46D89C3BC4 112293~|~1~|~2~|~02/S5K~|~Bridge Rehab~|~13 - Bridge Rehabilitation~|~8FA15579ADC9536F655C2064F082B77E386BA6D3 112293~|~1~|~3~|~03/NHS~|~Add new VPF to McElroy Rd bridge over US 30~|~13 - Bridge Rehabilitation~|~9763296C9D04868042D51B0FA8CFBF8713522C58 109803~|~1~|~1~|~01/STR~|~Resurfacing on SR 65 in Allen County from the Auglaize County line at SLM 0.00 to the Lima Urbanized Boundary at Breese Road which is at SLM 3.06. District preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~5086D445F14D09D56456081AACF3D6CEED9EE4DA 109803~|~1~|~2~|~02/S50~|~Resurfacing on SR 65 in Allen County in the Lima Urbanized Area but outside of the City of Lima. On both sides of the SR 65 from the Lima Urbanized Boundary at Breese Road which is at SLM 3.06 to where SR 65 enters the City of Lima on the left side at SLM 3.09, then on the right side until the beginning of the concrete pavement at SLM 3.63 and then on the right side of SR 65 from where it exits the City of Lima on the right side at SLM 4.06 until SR 65 leaves the City of Lima on the left side at SLM 4.56 then on both sides of the road until SR 65 enters the City of Lima at SLM 5.06 where the project ends. District preservation funds (4PF7 - 80% and 4PS7 - 20%). No local funds.~|~05 - 4R Maintenance - Resurfacing~|~8F33E7579C592704364D7AE57B4B6D30F788CDBE 109803~|~1~|~3~|~03/S50/LIMA~|~Resurfacing on SR 65 in Allen County inside of the City of Lima. On the left side of SR 65 from where SR 65 enters the City of Lima at SLM 3.09 until the beginning of the concrete pavement at SLM 3.63 and then on both sides of the road from the end of the concrete pavement at SLM 3.94 until SR 65 leaves the City of Lima on the right side at 4.06 and then on the left side of SR 65 until SR 65 leaves the City of Lima at 4.56. District preservation funds (4PF7 - 80% and local funds from the City of Lima 4BG7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~28121033359EBBB65AB7848C155DEA350F863CE9 109803~|~1~|~4~|~04/NFP/LIMA~|~100% city costs.~|~05 - 4R Maintenance - Resurfacing~|~FFD08999613903C56510BAFBE003862D2031CF36 109803~|~1~|~5~|~05/SAE~|~Adding both centerline and edge line rumble strips from SLM 0.00 to 3.00. Funded 100% with safety funds. ~|~21 - Safety~|~5DEA00AA01A65DF8F6551DE7B49C85DD143B406E 114003~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads in Warren County.~|~21 - Safety~|~1A342E9809CAA99617CD99774EA85DF50AD0A8B1 95748~|~1~|~1~|~01/NHS~|~LUC-5 from SLM 10.33 to SLM 12.11~|~05 - 4R Maintenance - Resurfacing~|~744B2EE9B290CAA33624B2C10C12AC253061D911 109777~|~1~|~1~|~01/S>2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~9866D51D3C547545748559606D4753A20CCF6F44 109777~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~17 - Construction Engineering~|~D3091D66A15D89124D89526D25FC6C777F7BA936 126439~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~6D260FEB6B486A8CEF738C81820775AA30D152DA 94564~|~1~|~1~|~01/SAF~|~Construct a left turn lane for south bound and north bound traffic on US 68 at the intersection of US 68 and Hickory Grove.~|~21 - Safety~|~969EE3B48EDE24F4BD5D2A31C20F0621530876FC 93671~|~1~|~1~|~01/STR~|~District Wide Pavement Marking~|~44 - Other~|~342A1BD712C4F0C2AD37859239664683B9232047 102536~|~1~|~2~|~02/STR~|~This split is for the rural section of the State Routes on this project.~|~05 - 4R Maintenance - Resurfacing~|~5DC10EA6135590349CCECE4E5B2AED3868CBBF9D 102536~|~1~|~3~|~03/NHS~|~This plan split is for NHS route of the project.~|~05 - 4R Maintenance - Resurfacing~|~3D3A7FE2F07562493C0A09A174334EA9A52A59E2 102536~|~1~|~1~|~01/S>2~|~Microsurfacing on minor arterial routes.~|~05 - 4R Maintenance - Resurfacing~|~B84D0F435B7866400100B7CD192B649D4C55B9C5 102536~|~1~|~4~|~04/S<2~|~This plan split is for the small urban route.~|~05 - 4R Maintenance - Resurfacing~|~FF78D0573B520027307DA26FF84B676BC324C526 107527~|~1~|~1~|~01/NFA~|~Resurfacing HOL-643 from SLM 0.00 to 4.12~|~05 - 4R Maintenance - Resurfacing~|~7E697A9B8039F3323081AD087D48801E451C087B 107527~|~1~|~2~|~02/STR~|~Resurfacing HOL-643 from SLM 4.12 to SLM 5.44~|~05 - 4R Maintenance - Resurfacing~|~25AF5DB02A8352B9E0DE4279D89307D0DAE6D4D4 117991~|~1~|~1~|~01/BRF/PCEO~|~Replacement of bridge at PER TR 1180 0.10~|~10 - Bridge Replacement~|~C612E735897B24E9D8DCB186C121A1F31B2A083B 124023~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs HUR-99-14.959 to 17.831 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~2F4859A2D6B97DB0823DD3C2FE160A3539DEF356 124023~|~1~|~2~|~02/S5K~|~Concrete Pavement Repair ERI-113-6.629 to 6.849Asphalt Concrete Overlay with Repair HUR-99-14.951 to 14.959~|~05 - 4R Maintenance - Resurfacing~|~6AFFD7B1964FDE70CAD919211BBB9B8F78FE8F4B 82941~|~1~|~1~|~01/IMS~|~Plan Split for SFN 5006511 MAH IR 680 0282 Bridge under Vestal Rd CR-522.~|~13 - Bridge Rehabilitation~|~3C55A04B5EC74831B6CC0009D0BC0A5C1D533957 94284~|~1~|~1~|~01/S<2~|~Bridge Accident Damage Repair - District Allocation~|~13 - Bridge Rehabilitation~|~46120418F0E240F5ECF08D7129DBBA6DAC625CC7 117620~|~1~|~1~|~01/NFP~|~Lighting upgrades/replacements.~|~21 - Safety~|~708AB3B7DABC544B9780AF7064D0858DB5260283 124351~|~1~|~1~|~01/IMS~|~Plan Split for widening bridge~|~13 - Bridge Rehabilitation~|~0C5781AA849BB54F9D9059F00BC357172A657B47 92892~|~1~|~1~|~01/S<2~|~District Allocation SLM 16.04-16.30 (Split)~|~05 - 4R Maintenance - Resurfacing~|~BB7AEDD02E39BA407C4A402D87A4DD10D5F64E78 92892~|~1~|~2~|~02/S<2~|~Urban paving - 80/20 - District Allocation/City of WoosterSLM 14.64-15.74 (Full)SLM 16.04-16.30 (Split)~|~05 - 4R Maintenance - Resurfacing~|~6E7EBA6CA87DD735E5871DA45EA46BE251B60467 92892~|~1~|~3~|~03/S<2~|~100% City of WoosterSLM 14.64-15.74 (Full)SLM 16.04-16.30 (Split)~|~05 - 4R Maintenance - Resurfacing~|~08630DC5355D696D021A189990ABC7E41417206C 116782~|~1~|~1~|~01/STR~|~WAY SR 0003 (04.62) (08.55) ~|~04 - Reconstruction - No Added Capacity~|~24E8F47EFBEE6008A12C17642DD66D165376C086 116782~|~1~|~2~|~02/S5K~|~WAY SR 0003 (08.96) & (11.61).~|~04 - Reconstruction - No Added Capacity~|~F83EE293462301C447104260D937A5BDA65983B4 85634~|~1~|~1~|~01/NHS~|~80/20 fed/state split for all work using federal NH funds.~|~05 - 4R Maintenance - Resurfacing~|~3DAB6F1B15493F0630506D768B3901355816058D 98807~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for eligible resurfacing work items.~|~05 - 4R Maintenance - Resurfacing~|~1C7E5A1A11E48EDCE035B19B082AEDD8B6B322C0 94112~|~1~|~1~|~01/S<2~|~Resurfacing ATB SR 534 from 25.26 to 26.15~|~05 - 4R Maintenance - Resurfacing~|~E895B51926096EFA319C3954BAED1BE4AA1E03F2 94112~|~1~|~2~|~02/S<2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~154B6236688156A86639C2AFE0EC110230BB5220 107988~|~1~|~1~|~01/NFP~|~Craig and Port Clinton lift bridges.~|~44 - Other~|~9FC970183E16885C550089BF5B0AC3A2F22DF861 96961~|~1~|~1~|~01/STR/LAW~|~It is proposed to replace an entire structure on SR 141, 0.15 miles west of SR 378.~|~10 - Bridge Replacement~|~D68FC522B6859C22F8EAAB847F1F493422940DCE 107296~|~1~|~1~|~01/CMQ~|~Upgrades to 14 existing signalized intersections in the City of Mt. Healthy along Compton Road and Hamilton Avenue (US-127).~|~21 - Safety~|~4C6C97AAF1C0E810200A60FBEA5DD0E6FB08CB66 107296~|~1~|~2~|~02/CMQ~|~Plan split for 100% City cost for work on unwarranted signals.~|~21 - Safety~|~9C492E758C6C9B5C174AAD9DF04BA248BBA5541C 101745~|~1~|~1~|~01/STR~|~Landslide repair, DSR# CAR-002~|~17 - Construction Engineering~|~661F692AC6AB2B8D506CB74A8DCD8E09C66D4DE5 91602~|~1~|~1~|~01/STR~|~Brdg Replacement. Located 2.02 miles south of Highland County Line on SR 41. 0103543 ADA SR136 23.05 Intersect: Trib Of W Fk Ohio Brush80 Fed/20 State.01/STR/BR/State~|~10 - Bridge Replacement~|~9B4C157F8BDCE78FA93D4E28002F4309986E4790 94337~|~1~|~1~|~01/BRO~|~Plan split for bridge repair work. 4306384~|~13 - Bridge Rehabilitation~|~F94175F427801FB3FE519667C08E1A794D83AF37 103630~|~1~|~1~|~01/S<2~|~DSR BEL-014~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0BE0D4DDC97D654FA55D46D1C4368E409D00A87B 121704~|~1~|~1~|~01/IMS~|~Work to improve drainage and repair wall damage from excessive drainage.~|~66 - Resilience Improvement - Highway Project ~|~A3B6A3BF31A43CCCFFC6DEFAB431ED0D200162F6 114569~|~1~|~1~|~01/IMS~|~Fine Graded Polymer Modified Asphalt Concrete mill/fill~|~17 - Construction Engineering~|~1FFAD1EF1F4487B669D5255B15957A03E31F446F 92810~|~1~|~1~|~01/BRO~|~Bridge replacement project. MOE 7 9.58, SFN 5600332. BR eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~12F7C585868CA48A2815064B2A5877D1E449649D 105373~|~1~|~1~|~01/ENH~|~Adding bike lanes on Wooster Ave in the City of Barberton.~|~~|~BAA712733F7FACA298806031A3CFC4419929C518 105373~|~1~|~2~|~02/MPO~|~Resurfacing of 2nd St SW.~|~~|~5126847C25A3DACC79254F793C6811642FB288E3 98834~|~1~|~1~|~01/IMS~|~Split for mowing~|~44 - Other~|~105CD8EAEEF238764906D346FFC36EA71902FAE9 103758~|~1~|~1~|~01/BRF~|~Bridge Split~|~10 - Bridge Replacement~|~69587BD115BB79076DCB8ADE82F741F0365B422B 103758~|~1~|~2~|~02/NFA~|~Plan split for Waterline Work across bridge - 100% City of Toledo Funds~|~43 - Utilities~|~90C43DF452959AD8ECB4F98E29A97855FC08263B 105152~|~1~|~1~|~01/BRO~|~All work in the project. All funds from the District Preservation Program budget. No local funds.~|~13 - Bridge Rehabilitation~|~11E48F4FD820AF75D6FD216580BE6FC5CFEA7FC8 96943~|~1~|~1~|~01/NFP~|~Task order soil and compaction testing~|~17 - Construction Engineering~|~77C3ACC94DE49C15E4F0A47FDD7F8CCE80EBEEF4 94082~|~1~|~1~|~01/IMS~|~Plan split for lighting work on the interstate system.~|~44 - Other~|~34B2AE22D986DF002757CC20668FEFD9CFBFBCAE 112989~|~1~|~1~|~01/BRO~|~Split for bridge rehabilitation work.~|~13 - Bridge Rehabilitation~|~ED2F1135BC2793B2D00AC355A634B4446ED70A15 95272~|~1~|~1~|~01/SAF~|~Upgrade signal to mast arms to support blank out signs in conjunction with railroad pre-emption.~|~21 - Safety~|~1CB58A6A573E9F292BE77FE6EF75E2EB08A9B0FC 95272~|~1~|~2~|~02/SAF~|~Improve radius to provide for truck turning from southbound Kauffman to Dayton Yellow Springs.~|~21 - Safety~|~CF0C11B004AC3C9041DB979D0C407F915A1FAE7D 112035~|~1~|~1~|~01/NHS~|~Improve intersection of US 33 and Hayden Run Rd (CR32)~|~21 - Safety~|~258854324C5E8CE2C74BE294B5ADC5FC33A089BD 86595~|~1~|~1~|~01/STR~|~Brdg Rehab. 0803693 BRO SR505 6.48 Intersect: Trib Of Mid Br Bullskin0.24 mile south of intersection with SR756.80 Fed/20 State. BR funding eligible but only for rehab, not replacement. 01/STR/BR/State~|~13 - Bridge Rehabilitation~|~0C0A009F30DFAA8A6262DE424BF77B3D051A40EC 102859~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% State funds from the District Preservation Program budget SAC 4PS7.~|~21 - Safety~|~7A3DDE4BE889B0668178D1F2FC4BF55357774F38 99419~|~1~|~1~|~01/SAF~|~Safety funded intersection project~|~21 - Safety~|~8B632BC5C60A671992DB265A30261C4D860B3526 102385~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement project for FY2022. Funded 80 federal/20 state.~|~21 - Safety~|~FB1FAE76216A86947D4E9DFB56518882EB37282C 102385~|~1~|~2~|~02/S<2~|~Guardrail upgrade/replacement project for FY2022.~|~21 - Safety~|~CCEB81F7315A95233633B6CA0B3694175019278F 102385~|~1~|~3~|~03/NHS~|~Guardrail upgrade/replacement project for FY2022.~|~21 - Safety~|~5687E9F0A3D7CF1A0B4AF7FBEEE54533B0E4D84D 84614~|~1~|~1~|~01/STR~|~Resurfacing a portion of SR 350 in Warren County. Work includes pavement repair, planing, new asphalt overlay, and all neceassary traffic control items.~|~~|~0A0A949D719AF1EDA5AA0FBC40BF84E0FB387A68 91972~|~1~|~1~|~01/BRO/CANT~|~Removal of SFN 7660898 Third Street Bridge over East Branch of Nimishillen Creek~|~13 - Bridge Rehabilitation~|~9FFB71B2AB3290FFF0FD5D9604C19C20140E14BA 91972~|~1~|~3~|~03/BRO/CANT~|~100% City of Canton items.~|~~|~EAE54F5C6364CE12131D206E1BD81A70398DBEBF 91972~|~1~|~2~|~02/BRO/CANT~|~Rehab of SFN 7660898 Third Street Bridge over East Branch of Nimishillen Creek.~|~13 - Bridge Rehabilitation~|~E02626B451B4AFCB6BC01E6B1115F504BB7B0E2B 110564~|~1~|~1~|~01/IMS~|~Rehabilitate Bridge HAM-275-3148 (Hopewell Rd over I-275) by replacing the barriers, adding a sidewalk, and replacing thte wingwalls.~|~13 - Bridge Rehabilitation~|~57FDDD6FD92810EB0E5962FC5AB2B69D1818B917 114184~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~CAE59B7A39765502ED500129430601D118B18F91 125499~|~1~|~1~|~01/MPO~|~Plan Split 1 for eligible items relating to SUP construction~|~01 - New Construction~|~7D69A9BD081F3EDEC4C81CEFB0E14F497487241F 123649~|~1~|~1~|~01/NFP~|~All work is in this plan spit. Uses new Bridge Maintenance Allocation funding for specific preventative maintenance eligible activities.~|~47 - Bridge Preventive Maintenance~|~48EC4A679BC4C44AC47F31F676B78614F0020F50 116855~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction costs~|~05 - 4R Maintenance - Resurfacing~|~14DEC4A945C176F78A541DC51DC666F1AC5AC29F 110792~|~1~|~1~|~01/NFP~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6C7BECC392139010A7D639FAB4F4D27789DB1DA4 110792~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F7B9957DEEA3F4C8FF12C8A9F9D1A72E3F7B8B0B 101981~|~1~|~1~|~01/NFP~|~Guardrail maintenance and repair on various routes throughout District Four.~|~44 - Other~|~3C3EE91A23E4092F8FB34152A97DC3F0D22F266B 95424~|~1~|~5~|~05/S<2~|~PIK 551 0.27 (CFN 665510027)~|~04 - Reconstruction - No Added Capacity~|~C11B8284EE6C6D78C9DD5D50844DBFFB09079E39 95424~|~1~|~1~|~01/S<2~|~LAW 775 2.51 (SFN 4404424)~|~04 - Reconstruction - No Added Capacity~|~83AF71D6ED60E394EB2691559BE4C4C13FD10FC4 95424~|~1~|~2~|~02/NFA~|~BRO 221 3.79 (SFN 0802859)~|~04 - Reconstruction - No Added Capacity~|~51FC14B4DB4178E4754F1CA1B5A35214F1766A35 95424~|~1~|~3~|~03/STR~|~BRO 68 24.58 (CFN 080682399)~|~04 - Reconstruction - No Added Capacity~|~20E980FE135748725C1A3136CFBABC199A155197 95424~|~1~|~4~|~04/NHS~|~BRO 32 14.83 (CFN 080321457)BRO 32 15.47 (CFN 080321525)~|~04 - Reconstruction - No Added Capacity~|~82CA057E3283EDA36EE42626F53B0B0708F54622 94475~|~1~|~1~|~01/STR~|~Drainage repair project. NOB 78 7.28-7.30. Emergency B project funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AF0F6284C0E2EDCE8E44799CACAE0E043D39E95C 117080~|~1~|~1~|~01/SAF~|~Pavement Marking ~|~21 - Safety~|~395675F6A269967DF862C744822EB82677855100 95548~|~1~|~1~|~01/ERD~|~100% federal participation using OH-216 earmark and TRC for Tiedeman Road improvements. This is the local portion of a larger project to mitigate traffice congestion at the IR-480 and Tiedeman Road interchange area. See also PIDs 80970 and 94723.~|~21 - Safety~|~71BC1720F4A1BD7C9DDB082D7AD828659CB6254B 93955~|~1~|~1~|~01/SAF~|~Pavement marking project for FY 2018. Various routes and sections in D10. Funded 100% state.~|~21 - Safety~|~5A62D751C07A60A882CACBEFD0BEC89445DFAEAF 125438~|~1~|~1~|~01/NHS~|~Culvert liner project. GAL 35 5.13, SFN 2700778.~|~04 - Reconstruction - No Added Capacity~|~FA52BF507142AD49914AF62C07EF16BF88126365 93429~|~1~|~1~|~01/NHS~|~priority system minor rehab. of HAS-22-21.68 to 25.23; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~4C22A60C6B91D5A68BEF1AC86ADA05E22D778A86 109792~|~1~|~1~|~01/STR~|~Double Microsurface~|~17 - Construction Engineering~|~504CA89AC37F32B172BEF6EBCCDCF6F8CBAC3A2F 109792~|~1~|~2~|~02/S>2~|~Double Microsurface~|~05 - 4R Maintenance - Resurfacing~|~FC1A6FFE6AAA811A43CE6FE1AFB1D3F9D72F908C 100215~|~1~|~1~|~01/STR~|~Installation of plug pile wall to stabilize slide area.~|~04 - Reconstruction - No Added Capacity~|~5483851ED7085AD658FB869C4CA1C2638F397757 119735~|~1~|~1~|~01/BRF/LEB~|~Replacement of the Kingsview Drive bridge (SFN 8360235) in the City of Lebanon.~|~10 - Bridge Replacement~|~4D793FBADBDC867E5F3F70A27795F33941C35875 119273~|~1~|~1~|~01/BRF~|~Replace deck on structure over the Olentangy River~|~13 - Bridge Rehabilitation~|~B0457497DF709AA095AE3FB2DFF22D1F29115DF8 93862~|~1~|~1~|~01/BRF~|~Plan split 1 added for LBR funded work. Local-let by Franklin County Engineer.~|~13 - Bridge Rehabilitation~|~B05F285F4C83A086F36567D3362AE89E4CCCCA97 105394~|~1~|~1~|~01/NHS~|~Bridge repair on NHS bridge.~|~13 - Bridge Rehabilitation~|~F5ADA7F27617184A6A2D4D89FD72E1F0C629E52E 96073~|~1~|~1~|~01/NHS~|~"01/NHS/OT/ " - plan split for construction of Salt storage building at the proposed Crooksville OP in Perry County.~|~44 - Other~|~62FF13D62BA78407E3146381D577AC695688D7B0 92987~|~1~|~2~|~02/NFA~|~District Preservation 7BPB/4PS7(100% State) - CAP of $3,675,627.76 7BPB Funding - Resurfacing with related work on: 1) Cos-SR 621-00.00 to 05.98; 2) Cos-SR 643-00.00 to 10.87;~|~05 - 4R Maintenance - Resurfacing~|~A7EE45D24484650C6F251159EAEEA546E2BC9607 92987~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Cos-SR 651-00.00 to 02.84; 2) Cos-SR 651-02.84 to 03.04; 3) Hol-SR 651-00.00 to 00.50; 4) Tus-SR 651-00.00 to 00.45;~|~05 - 4R Maintenance - Resurfacing~|~C86E3A7D161B51642CBC0BC7B3A1B5290152281B 88495~|~1~|~1~|~01/S<2/BG~|~SR-64 from SLM 4.12 to SLM 4.26 urban in City of Bowling Green.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8EBCFE5B5C741BB8FAE01C3E4696FEC3943D4CAA 88495~|~2~|~2~|~02/STR~|~SR-64 from SLM 4.26 to SLM 9.15 in Wood County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C739F7D9B1C88A56CB35A6BADF4AA1224203D463 113168~|~1~|~1~|~01/MPO~|~Resurfacing of West Steels Corners Rd from Akron Peninsula Rd to Northampton Rd in the City of Cuyahoga Falls.~|~05 - 4R Maintenance - Resurfacing~|~317B134CDEC5FB8BD1CAD3C5A5560FD51929C754 117993~|~1~|~1~|~01/BRO~|~Bridge replacement. All work is included in this plan split.~|~10 - Bridge Replacement~|~AFC6F453B26FC7EF946FD4C73C2C89E9359F61BB 94436~|~1~|~1~|~01/STR~|~Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~51EED730110FECC84AB053B9AD87F1149A7CB712 96867~|~1~|~1~|~01/STR~|~Work funded with Federal rural STP funds from the County Engineers Association of Ohio (CEAO) budget. The 20% non-Federal match is provided by the Defiance County Engineers office.~|~04 - Reconstruction - No Added Capacity~|~49529F1CC6D32EEACF5089F111FE3B78473D9407 101646~|~1~|~1~|~01/NHS~|~Culvert Replacements: WAY-250-28.89~|~04 - Reconstruction - No Added Capacity~|~45D4BF07C3A71301CE7B260A339DFF605287D061 109196~|~1~|~1~|~01/S<2~|~resurface Starr Ave SLM 1.64 to 3.54~|~05 - 4R Maintenance - Resurfacing~|~C459A30AB1CA117EA0CE8554B6F485E8297DBF9E 119041~|~1~|~1~|~01/IMS~|~Placeholder plan split until locations are selected.~|~47 - Bridge Preventive Maintenance~|~1CDA910D8CCB97F43C85B0546A064D3BA79AF9EF 124803~|~1~|~1~|~01/BRO~|~Maintain bridge carrying SR 164 over Yellow Creek by repairing and protecting pier piling.~|~47 - Bridge Preventive Maintenance~|~7D510BFA7F098C727A272FCC090FD5E6276CAE58 101730~|~1~|~1~|~01/BRO/MCEO~|~Muskingum County Engineer CEAO LBR Funding - 4B87 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Replacement of SFN 60313077 MUS-CR66A Intersecting Muskingum River- Length= 688' Width 24' / SD/FO=2 / SR=17.0 / DSR=3~|~13 - Bridge Rehabilitation~|~120B6878F654046544FF7C203AD3B26BF5D23B88 101730~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~44 - Other~|~D5613CA13FD944232212DFFBDF173426FA007AE5 105030~|~1~|~1~|~01/MPO~|~ERPC MPO funding ERI - CR 5 - 3.19 to 5.61~|~05 - 4R Maintenance - Resurfacing~|~A10F9E11DCD8C6F8BBB54D9E06A28A7E0ABE6633 113916~|~1~|~1~|~01/IMS~|~Systematic sign replacement at various locations in Madison County~|~21 - Safety~|~CF0A9983C41A5D0F8310CB995B2ED8CC07B3F450 103525~|~1~|~1~|~01/S>2~|~FY2020 Urban Paving for the City of Milford on US50 within the City of Milford. The limits are 0.00 - 2.21 - US50. This Plan Split is for the items paid at 80% ODOT and 20% City mainly consists of planing, new asphalt overlay and final striping.~|~05 - 4R Maintenance - Resurfacing~|~B928B7F49370FB39028FEFA21F3C9DFEBFC392D8 103525~|~1~|~2~|~02/S>2~|~FY2020 Urban Paving for the City of Milford on US50 within the City of Milford. The limits are SLM 0.00 - 2.21 - US50 within the City. This Plan Split is for the items paid at 100% City: mainly consist of pavement repair, MOT striping, utility work, curb & gutter and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~C1C0FDC4C9A5AD0508B759468C5C333A78F1A021 107839~|~1~|~1~|~01/STR~|~Landslide repair project. MRG 60 8.43-8.47. 100% Federal ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~04AEE714367BDA4079B874C4A85FA402BB9E7DE6 126393~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~530CCC7474942034C1686A0BBCC8FC9A927A8F9C 105573~|~1~|~1~|~01/NHS~|~All work in this project. On the NHS. All funds are from the District Preservation Program budget. No local funds.~|~04 - Reconstruction - No Added Capacity~|~BDEBEB710FEC30F36FF6CCBA11892DC44EB36177 107583~|~1~|~1~|~01/NFP~|~Paint Inspection Task Order~|~17 - Construction Engineering~|~4B8F3B5E7083C57C734710E8CB47A793098BBF60 107777~|~1~|~1~|~01/STR~|~Plan split created~|~13 - Bridge Rehabilitation~|~6C8247AD067347E127E3C577ED074A6059459B2B 88768~|~1~|~2~|~02/STR~|~Replace deteriorating wearing surface CHP SR 560 0156 over Nettle Creek with no approach work except approach slabs. Asphalt overlay precluded by legal load rating.~|~13 - Bridge Rehabilitation~|~6153493372919F85CB786F7A64018497F11E1081 88768~|~1~|~1~|~01/BRO~|~Replace deteriorating wearing surface on SFN 1103121 CHP SR 560 0148 over Owens Creek with no approach work except approach slabs. Asphalt overlay precluded by legal load rating.~|~13 - Bridge Rehabilitation~|~AC9004808F2BBA60C9BF12A6865C474440D00DFD 92361~|~1~|~1~|~01/STR~|~resurface FUL SR108 0.00 -2.96 - Henry County line to Wauseon Corp line~|~05 - 4R Maintenance - Resurfacing~|~1E3041A3CC0D1BAFC011CC5C3015B8BC91A7C1C2 92361~|~1~|~2~|~02/S<2~|~SLM 2.96 to 3.47~|~05 - 4R Maintenance - Resurfacing~|~CBAD5014FC8E8E5153D97260EEEFE8BC6FFE89F1 92361~|~1~|~3~|~03/S<2~|~Urban Paving Funding Split in Wauseon~|~05 - 4R Maintenance - Resurfacing~|~65A24F68D7E0983E676E1C07B3BA42ECBF2FEFD2 92361~|~1~|~4~|~04/NFP~|~100% City items in Wauseon~|~05 - 4R Maintenance - Resurfacing~|~3F0E70684BC09183AE9182C12043256A157DBFF4 92361~|~1~|~5~|~05/SAF~|~Center Line Rumble Stripe Plan split - FUL - SR 108 - 0.0 to 3.016~|~21 - Safety~|~DC6868BE0B67B0030875126CFCBA6FC8D4B6EA42 123515~|~1~|~1~|~01/NFP~|~Test lab consultant inspector~|~~|~4584B5D2755D8418D1D844247BA77305027649B0 93445~|~1~|~1~|~01/NHS~|~Construction of noise walls along State Route 8 between SLM 16.66 and SLM 17.55, in Summit County, Ohio.~|~44 - Other~|~F5624B2E3331D65AA81ED4E408F61AFEC8D29D20 121471~|~1~|~1~|~01/NHS~|~Joint repairs within the project limits~|~05 - 4R Maintenance - Resurfacing~|~D574C65D3315C54F1E32F1C5FDC84368B59621CD 104993~|~1~|~2~|~02/STR~|~Replacement of GUE-658 culvert~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~84A42F72FA1BA6168D67F09C3D1EF0E4D6990DAD 104993~|~1~|~1~|~01/IMS~|~Repair or replacement of identified Conduits along IMS system.~|~17 - Construction Engineering~|~6AD374AEE59D5775F5C812FAB1844A81EBC15B88 123577~|~1~|~1~|~01/IMS~|~Pavement repairs on GRE-675~|~05 - 4R Maintenance - Resurfacing~|~9E668D6616AA2DC2444952001B8D3453BAB59923 94255~|~1~|~1~|~01/IMS~|~01/IMS/PV/ ; District Preservation 4PF7 (90% federal) / 4PS7 (10% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~41EE4E41B3AA82B5F5061C82059B85F498BB6A2D 119102~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~DD2D0685ADBCD4DF2C8451FC6E15E372427AB0A3 102731~|~1~|~1~|~01/STR~|~This plan split is for bridge size culverts on rural route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1F8F27712C574CC1899B907E62DF0AAFD0A95DA8 77239~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - TRAC Funding TRAC (80% Federal) / TRAC(20% State) - No CAP - New Construction on 1) Mus-SR 16-10.25 to 14.86; 2) Cos-SR 16-00.00 to 07.35~|~~|~67B85DFD43F514E81DE86799D11ADA872A51E1E0 109211~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~C848A18AC9719C588F955BE55865AC03148B7788 109211~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~F18A1ACA3573EC37D75A67F2BF4982E7EFD52170 109211~|~1~|~3~|~03/S<2~|~Construction Inspection.~|~17 - Construction Engineering~|~07CA213E47A527834D2492A8D5FB9528EC8F1E07 109211~|~1~|~4~|~04/S50~|~Construction Inspection ~|~17 - Construction Engineering~|~F9D4D5536FE316EC9BE58A21BE45C76267E5753A 117316~|~1~|~2~|~02/NHS~|~CO CC NHS plan split linked to 1987474~|~04 - Reconstruction - No Added Capacity~|~86545651BA9F751EBED716A204ECDA9537F48C6D 117316~|~1~|~1~|~01/IMS~|~HAM-275-0900 (1839674), HAM-74-1091 and HAM -74-1095 have been linked to CO CC IMS funding~|~04 - Reconstruction - No Added Capacity~|~0DAFA02DA8DE9BF929D7494791604226ACEA94C2 108817~|~1~|~1~|~01/NFP~|~Replacing the linked culverts.~|~04 - Reconstruction - No Added Capacity~|~5D27F5A91F1363966E51969872AFB0EC299F3475 122476~|~1~|~1~|~01/STR~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~20C2542AEAFF34B2FBD4AB7BBD0305C89DD0777F 101028~|~1~|~1~|~01/SAF~|~District wide pavement marking and RPM contract for FY2022 in D8. Locations to be determined.~|~21 - Safety~|~A1414FE92F500092B1A84EF1CF21796BCA698C66 98721~|~1~|~1~|~01/NFP~|~Mowing contract. Maintenance contract funds. 100% state funds. SAC 4CP7.~|~44 - Other~|~A1728EC51C8B79EC3471F33251D919ECA63C0E0F 119560~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~50B8E1D876BC3D65F2F6AE918BAA27425A1A93D9 105204~|~1~|~1~|~01/NHS~|~plan split for the pavement repairs on a portion of HAM-126 and incidental bridge patching work~|~05 - 4R Maintenance - Resurfacing~|~7A4D50DC7F8AB37C0CE6DD38C9E77A9219200D77 106640~|~1~|~1~|~01/STR~|~Bridge rehab to include floorbeams, stringers & deck. No approach work.~|~13 - Bridge Rehabilitation~|~B338DB0E874D735814414CDD289018C832884D10 76691~|~1~|~3~|~03/IMS~|~03/IMS/PV/ Work reconstructing the Interstate including the ramps. It does not include work replacing or reconstructing the bridges. The bridge work is in another split. Funding from the Major Rehabilition program.~|~04 - Reconstruction - No Added Capacity~|~4ED1AA45D59DFAF1DC722F47580DFF03FDFC8CDB 76691~|~1~|~5~|~05/ENH~|~05/ENH/OT/ Transportation Enhancement eligible activities.~|~31 - Landscaping & Other Scenic Beautification~|~557106F19501AE41828B2A49BC7F4F6C3BC41A74 76691~|~2~|~7~|~07/CMQ~|~07/CMQ/OT/ CMAQ eligible pedestrain facilities along the SR 117/309 corridor outside the interchange area. The CMAQ elgibility was approved March 28, 2011. The cap on the MPO-CMAQ funds for this split is $132,770. Pedestrian facilities in the interchange area, also funded with CMAQ funds, are in a Plan Split in part 1.~|~28 - Facilities for Pedestrians & Bicycles~|~8D51AC5C060DA1F489238926E48770E6FC42DABA 76691~|~1~|~4~|~04/S<2~|~04/S<2/PV/ Roadway work on SR 81 and SR 117/SR 309. Costs for the traffic signal work is also in this split. Funds from the Major Rehabilition program.~|~04 - Reconstruction - No Added Capacity~|~BBCB891090DDB9F8B10F69A79C1B68A82ED32BA6 76691~|~1~|~1~|~01/CMQ~|~01/CMQ/OT/ MPO-CMAQ funding approved for this project to construct sidewalks along SR 117/SR 309 in the interchange area. CMAQ cap is $50,000. 20% match and overage from the Major Rehabilition program. The approval letter for CMAQ funds was dated March 28, 2011. The CMAQ funds are from the Lima MPO.~|~28 - Facilities for Pedestrians & Bicycles~|~DC3D8B1E1921A05201CE3EA5E07C758365E37F3A 76691~|~2~|~6~|~06/SAF~|~06/SAF/OT/ Safety improvements to the SR 117/309 corridor. Funds from the ODOT Central Office controlled safety program. This split does not cover the pedestrain facilities along the corridor. On SR 117 from 0.02 mile west of Roschman Avenue jct to Greely Chapel Road jct. and on SR 309 from Willard Street to Devonshire Drive.~|~17 - Construction Engineering~|~FACA9D5AC59206D64031635376E55C7C704885F5 76691~|~1~|~2~|~02/IMS~|~02/IMS/BR/ Work replacing or reconstructing bridges. The work in this split is not eligible for federal BR funds. Funds from the Major Rehabilition program.~|~10 - Bridge Replacement~|~FBA43A433522BD705E73333E93F247D8829C49FE 96972~|~1~|~1~|~01/IMS~|~2 year maintenance contract for Lighting and Loop Repair on various Highways in ATB, MAH and TRU counties.~|~21 - Safety~|~5D24D2177D68376D802405583026DED0831A71C9 99001~|~1~|~1~|~01/NFA~|~Maumee River MUP~|~28 - Facilities for Pedestrians & Bicycles~|~B6264AB0C6CEB70D27D133F691B038CECCEE68D4 122272~|~1~|~1~|~01/MPO/MASS~|~Signal improvements.~|~21 - Safety~|~8F16AC89B2B1136F003C2EF97F40192AD474AFD9 88398~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds.~|~47 - Bridge Preventive Maintenance~|~61B469AF172CAB71F3123E6D41BF1A24C6AA3F98 126808~|~1~|~1~|~01/IMS~|~APSHLAT OVERLAY OF NOB IR 77 11.198 - 16.077.~|~05 - 4R Maintenance - Resurfacing~|~7F3F32B7CC4EF791D1AD5688787EC4BC152ED99A 87641~|~1~|~1~|~01/S<2/NEWA~|~"01/S<2/PV/NEWA" - Local Funding LCATS 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP 4TA7 of $449,136.00 Federal - Resurfacing of: 1) 30th Street Lic-CR 802-01.27 to 2.05; 2) W. Main Street Lic-CR 132-00.24 to 01.55; 3) Cherry Valley Road Lic-CR 128-00.66 to 00.99;~|~04 - Reconstruction - No Added Capacity~|~4FD2DCFE433AD789D519249C671CCC2C84613E51 87641~|~1~|~3~|~03/S<2/GRAN~|~"03/S<2/PV/GRAN" - Local Funding LCATS 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP 4TA7 of $125,558.00 Federal - Resurfacing in Village of Granville of Cherry Valley Road Lic-CR 128-00.30 to 00.66~|~05 - 4R Maintenance - Resurfacing~|~6F795BE5E7706E1C81B99C8C89D21310B4C5317C 87641~|~1~|~2~|~02/S<2/HEAT~|~"02/S<2/PV/HEAT" - Local Funding LCATS 4TA7 (80% Federal) / 4BG7 (20% Local) - CAP 4TA7 of $300,000.00 Federal - Resurfacing of 30th Street Lic-CR 802-00.39 to 01.27~|~05 - 4R Maintenance - Resurfacing~|~88269294FADAF17A9AECF7F96B64F6415A1A2585 85611~|~1~|~1~|~01/STR~|~Split for all work on the Rural STP system from SLM 0.00 to SLM 1.39~|~05 - 4R Maintenance - Resurfacing~|~AD8511F3B7301C75E3D10DBF51D035E3CE01CF5D 85611~|~1~|~2~|~02/S>2~|~Split for all work on the Urban STP sytem from SLM 1.39 to SLM 3.57.~|~05 - 4R Maintenance - Resurfacing~|~C6E67908260DD9EC1746E2A572C88103AE0AF0D8 95925~|~1~|~1~|~01/NHS~|~Overlay bridge deck with LMC using hydrodemolition, reface/patch parapet, seal median joint, refurbish & rest abutment bearings, various structural steel repairs and other various bridge items. Bridge # MIA-36-1134, SFN 5500095.~|~13 - Bridge Rehabilitation~|~6DE8C50726763807F36BED9E13683BD5274C6A4F 95925~|~1~|~2~|~02/NHS~|~Roadway work associated with a shared use path.~|~28 - Facilities for Pedestrians & Bicycles~|~22771627B55E304440DA659787F14E5F649FE228 94491~|~1~|~1~|~01/CMQ/CIN~|~Construction of a combination of 10' wide bike path and existing and new 5' wide side path along the west side of Kellogg Avenue to connect the existing trail system at Salem Road and Sutton Road. Retaining walls will be constructed to accommodate grading and aid with slope stability.~|~17 - Construction Engineering~|~15FA31051DA6449F5682E17BC2950D7087B78566 94491~|~1~|~2~|~02/CMQ~|~Construction of a shared use path that follows US-52 between Salem Avenue and Sutton in Cincinnati.~|~28 - Facilities for Pedestrians & Bicycles~|~446CC96E7E1BAF1E58C67400F907019EF31C9926 95102~|~1~|~1~|~01/S>2~|~Resurfacing of Palmyra, Highland, Main streets, including curb ramps, guardrail, signing, and pavement markings, in the City of Warren, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~2827226766014728E84CFE383467A7B935099B50 91559~|~1~|~1~|~01/BRO~|~Replace existing box-beam superstructure on bridge (HOL-62-1818, SFN 3801403) with a new steel beam superstructure. Repair substructure units.~|~13 - Bridge Rehabilitation~|~58F37D7197EE0FF3BB6FB5DF03EA38F50A850CC1 126743~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding. ~|~44 - Other~|~01BC384406CD82EF23CB35788A9E529D82FAACF6 114650~|~1~|~1~|~01/IMS~|~Paint bridge HAM-74-0838L/R which carries I-74 over Great Miami River and repair steel for HAM-74-0911L which carries WB I-74 over Wesselman Rd and Taylor Creek~|~13 - Bridge Rehabilitation~|~0261507D5F1F276FF14E85826B8B68425E6B2C49 103794~|~1~|~1~|~01/MPO~|~Resurfacing of a park road.~|~05 - 4R Maintenance - Resurfacing~|~9B2192E2279C5AF26BBB72AE56348B172651A6B4 77887~|~1~|~2~|~02/NHS~|~Click on plan split to see linked bridges.~|~13 - Bridge Rehabilitation~|~8492BDF57AE20FDEAD2C4EACC18202C64C688F14 77887~|~1~|~3~|~03/IMS~|~Interstate bridges.~|~13 - Bridge Rehabilitation~|~07005DB4BAB9DC90FEFF354E05E11D70D64B6F7B 77887~|~1~|~1~|~01/NHS~|~Plan split for pavement for STA US 30 from 13.10 to 16.72.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~15ACD3DDFADDC1405C1259F21CFF1EC9CBAEF368 77887~|~1~|~4~|~04/NHS/CANT~|~Alternate bids for LED Lighting. City of Canton is paying the difference between "normal" lighting and LED.~|~44 - Other~|~9D4D95521ACFD21973438A043E0A8829119B4E89 116771~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~1897C3C7EABD4BF7B1A8E8804C12C189B44C7E2E 116771~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~E20A8D1FA7F8E4B3CA89F1635A273EF0894B4A52 84592~|~1~|~3~|~03/STR~|~Plan Split for SFN 6703402 POR SR 82 15.19 over Silver Creek, SFN 6703437 POR SR 82 16.81 over Eagle Creek, SFN 6703488 POR SR 82 19.01 over Branch of Eagle Creek, SFN 6703496 POR SR 82 20.76 over Branch Eagle Creek, SFN 6703526 POR SR 82 21.70 over Eagle Creek. SFN 6704506 POR SR 303 19.51 over Branch of Eagle Creek.~|~13 - Bridge Rehabilitation~|~515E627283CC7CB8148B575AD853E9A55243E16D 84592~|~1~|~1~|~01/STR~|~Created Plan Split STP Rural for POR SR-82 from 10.65 to 22.53. Resurfacing of TRU SR-82 from 0.00 to 1.63, Braceville Township, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~63BC9FAF738D1BFEFBBCC3CE79A8AB42C1497D77 84592~|~1~|~2~|~02/BRO~|~Plan Split for SFN 6703364 POR SR 82 10.65 over Cuyahoga River~|~13 - Bridge Rehabilitation~|~F93E5DEAAFA1307F6E1EABF58E90D4BAC9943C10 94682~|~1~|~1~|~01/NFA~|~All work cna be paid for with all of the various funds.~|~04 - Reconstruction - No Added Capacity~|~9FF3B40F4202BC541C5B7BB3FA9CA2CF5B5D380C 98595~|~1~|~1~|~01/IMS~|~Slide @ LUC-75-8.51 NB~|~21 - Safety~|~9F3942BB9A792C1199225E9928EEA0DD8E9509D0 126881~|~1~|~1~|~01/BRF~|~Primary plan split for CEAO Exchange funding~|~13 - Bridge Rehabilitation~|~4E6D6127CE81BECB03E6865DC692613F7249913C 92639~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 2 years Herbicidal Spraying Contract~|~31 - Landscaping & Other Scenic Beautification~|~1680D0811159E262D5D40E3832F10FCB6B194142 102047~|~1~|~1~|~01/SAF~|~Construct a modern roundabout at Norton and Johnson Road~|~21 - Safety~|~E00A8E8DF06300F0A262359FE418DEE21EC1BB30 103854~|~1~|~4~|~04/S>2~|~Waterline relocation, project eligible.~|~43 - Utilities~|~59A3CFEC2FC06630C147A1D210D902141569BD98 103854~|~1~|~3~|~03/S>2~|~Conduit replacements, extensions, and removals.~|~04 - Reconstruction - No Added Capacity~|~3E9320F0C14FF553A563CF2D2D7E815E298A2B03 103854~|~1~|~2~|~02/S>2~|~Replacement of drainage system, curb and gutter.~|~04 - Reconstruction - No Added Capacity~|~CB8A92CF8ECFB54167F9D9205955512D207EBD22 103854~|~1~|~1~|~01/S>2~|~Pavement resurfacing/replacement in the Village of New Middletown.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~13AEAC9DC22E5B4E3F7F319E273D5F3C2D59F9F8 112553~|~1~|~1~|~01/STR~|~Resurfacing project with an asphalt overlay treatment. HOC CR 249 0.00-3.32. Rural federal aid funded 80 Federal/20 Local.~|~05 - 4R Maintenance - Resurfacing~|~148343A521F3640D73409514F8D3B873DC388346 126774~|~1~|~1~|~01/STR~|~Reconstruction of SR-4 in Seneca County SLMs 0.000 to 4.24~|~04 - Reconstruction - No Added Capacity~|~6387EFD950789E9C02D29594C5BD6CAE4D1565BE 109164~|~1~|~1~|~01/IMS~|~Repairs and deck overlays on 7 bridges on FRA IR 71 between 17th Ave and SR 161~|~17 - Construction Engineering~|~E22CE1DAB73D9B2D73847888277B0E8FC5F8E292 109164~|~1~|~2~|~02/IMS~|~Bridge Items associated with widening the bridges.~|~13 - Bridge Rehabilitation~|~2D8F629CD90E0405818A3C1D121863E9CF10C9E8 109164~|~1~|~3~|~03/IMS~|~ITS items associated with extra capacity~|~44 - Other~|~19067614D11CD6FDA662E0319552F5C28896D8BB 109164~|~1~|~4~|~04/IMS~|~Items associated with resurfacing of existing pavement~|~05 - 4R Maintenance - Resurfacing~|~26794C4F941657D3DE3648D4F514EC68D1C34783 109164~|~1~|~5~|~05/IMS~|~Roadway Items associated with the widening of I-71.~|~03 - Reconstruction - Added Capacity~|~C14138257C4C1AF82CFE884D4E9C3D31144D1F49 91898~|~1~|~1~|~01/NFP~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~21A6DE13A8AD797A77007ED4261EBFEFF2557FBD 91898~|~1~|~2~|~02/NFP~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~9B7BB66994ECA5AE4A4B43CB6CCCC077C69DF24E 115181~|~1~|~1~|~01/S>2~|~Rebuild the roadway including new street pavement, curb, sidewalk, street lights, and catch basins.~|~04 - Reconstruction - No Added Capacity~|~520281D99DA1493FA904B3F3D7B3DFFA7BD649D3 98020~|~1~|~1~|~01/NFA~|~Reconstruction and signalization of Honda Parkway~|~03 - Reconstruction - Added Capacity~|~120D075C7156CB01D7F9B10ADC9880ED0C37EB06 124032~|~1~|~1~|~01/NHS~|~Replace superstructure ~|~10 - Bridge Replacement~|~72551FECC3EFAD46222B612E21A8F2CB845AC957 110567~|~1~|~2~|~02/S<2~|~Bridge Maintenance Project to perform minor maintenance bridge repairs.~|~47 - Bridge Preventive Maintenance~|~784A0FD9EC62E8F9DE05949631501EBD12DF2325 110567~|~1~|~3~|~03/NHS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs.~|~47 - Bridge Preventive Maintenance~|~0EB8E87B17FCB2182B0C5F45337FB19FAEEEF2C2 110567~|~1~|~4~|~04/STR~|~Bridge Maintenance Project to perform minor maintenance bridge repairs.~|~47 - Bridge Preventive Maintenance~|~635C3CD4A142B46679BFEC76429DB5E892A6B133 110567~|~1~|~5~|~05/SAF~|~Epoxy overlay on SFN's 3106497 and 3106551 to increase pavement friction.~|~21 - Safety~|~47E869CDF0D83F740E40E5EF693B2E3516E4C275 110567~|~1~|~1~|~01/IMS~|~Bridge Maintenance Project to perform minor maintenance bridge repairs on Interstate bridges (Not funded by Safety)~|~47 - Bridge Preventive Maintenance~|~8D0CF19E3393909F6111CAA3C10F44542CEC2EFA 110567~|~1~|~6~|~06/IMS~|~Place HFST on I-71 just south of the Lytle Tunnel. ~|~21 - Safety~|~D9765A1B9620314AC2E24CAA4DFC4D015F1805A5 110567~|~1~|~7~|~07/IMS~|~Work to repair collision damage to bridge WAR-63-0010. 4SR7 (Bridge collision repair funds to be utilized for this structure only).~|~13 - Bridge Rehabilitation~|~EDC6AE8AE8A06ECF963DE719A99D4BD11BFC2E90 110567~|~1~|~8~|~08/IMS~|~Plan split associated with installation of West Chester Township's decorative VPF on the HAM-75-1747 structure. Fence procured under PID 105478 and being installed under this PID.~|~47 - Bridge Preventive Maintenance~|~A6429FA2DBBF130F5BDE268E2A52935F5963936C 121204~|~1~|~1~|~01/MPO~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~1641D1788C0846570E3F9229F60291EF858BC3B8 100784~|~1~|~1~|~01/SAF~|~Construction of a rural single lane modern roundabout at the intersection of Old SR-122 and Township Line Road. The vertical profile of the east leg of Old SR-122 will also be adjusted to improve sight distance to the intersection.~|~21 - Safety~|~4C38ED05852054EE5CCAF25146D4A7E153A40621 123324~|~1~|~1~|~01/IMS~|~Resurfacing.~|~~|~55AFA5E0E08867569DD0072C6321D51ADF70E315 123324~|~1~|~2~|~02/IMS~|~Bridge preventative maintenance to multiple bridges.~|~~|~4A1C5A29BEE3DF58FC51FAD58663918FBDEBF2EF 90701~|~1~|~1~|~01/MPO~|~reconstruct LUC CR2233 0-2.23; reconstruct South Ave from Reynolds Rd to Byrne Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD2F74CB52F3EC534CD774CD2F6E52E049A71D24 114486~|~1~|~1~|~01/S>2~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~59CA87EA4A812CC782CBAF924FD34B41C170AA68 119158~|~1~|~1~|~01/NHS~|~All work outside the Defiance Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~18AA4F005B5675E75496D783E94C6542748CEC45 115224~|~1~|~1~|~01/SAF/HOL~|~Pavement marking on various county routes using 100% (4HB7) CEAO Safety funds.~|~21 - Safety~|~071AB7594EC472942AFAA2F86EBF7E1CFB36B615 120580~|~1~|~1~|~01/S>2/KY~|~Bridge repairs.~|~13 - Bridge Rehabilitation~|~645D635E8731A6FAF1789B7169E8C863143E11F2 97031~|~1~|~1~|~01/NFA~|~Construction of 800 feet of a two-lane access road to new health care facility in MEG County. ARC funded project. Funded 100% federal. Overages will be paid by local.~|~01 - New Construction~|~1FD995E34C6F5E20766F5B97829EAB0D3385AFDB 103436~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from both safety funds and state district preservation funds. ~|~99 - State Preventative Maintenance~|~80ACA6B5E8DABAF6617F4884E7BE188FF447C6DA 112660~|~1~|~1~|~01/MPO~|~Resurfacing of North Rd from SR 169 to US 422 in the City of Niles.~|~05 - 4R Maintenance - Resurfacing~|~7653F6C12406A17FE810619228405DCB2EFF1DB3 116621~|~1~|~3~|~03/STR~|~Work on MAR-203 from 7.749 to 12.992~|~05 - 4R Maintenance - Resurfacing~|~6861715359766945EE5285E6CB9FBDBACF5C5A08 116621~|~1~|~2~|~02/S5K~|~Work on MAR-309 18.787 to 19.531, MAR-309 22.407 to 22.776, MAR-95-17.187 to 17.904, MAR-95 18.217 to 18.477~|~05 - 4R Maintenance - Resurfacing~|~7465B301DA3B6204DB58EF2549DF1C7779212ED8 116621~|~1~|~1~|~01/NHS~|~Work on MAR-309 from 19.531 to 22.407~|~05 - 4R Maintenance - Resurfacing~|~172B28C9BE7437B0FA5FB30317D5B3D242B0CFB2 92086~|~1~|~3~|~03/BRO~|~3 span concrete slab deck bridges peir encasement repair on all piers, piers 1 & 2 (left and right) with no approach pavement work along with clearing and grubbing on SFN 5401291 MER SR 118 0201 Wabash River.~|~13 - Bridge Rehabilitation~|~5A3B96F279CCF77FD0BFF45AC0C330213FF5A26A 92086~|~1~|~2~|~02/BRO~|~3 span concrete slab deck bridges peir encasement repair on all piers, piers 1 & 2 (left and right) with no approach pavement work. Clearing adn grubbing required on SFN 1904086 DAR SR 705 1504 Arling Joint Ditch.~|~13 - Bridge Rehabilitation~|~68430572EA72E8EC9689C3C324C72F7C11E4F066 92086~|~1~|~4~|~04/STR~|~3 pan concrete slab deck bridges pier encasement repair on all piers, piers 1 & 2 s (left and right) with no approach pavement work along with clearing and grubbing on SFN 5501202 MIA SR 48 1765 over Old Chan Trotters Creek.~|~13 - Bridge Rehabilitation~|~D548C58638A901AB642FA7DFD49AB00597A471B6 92086~|~1~|~1~|~01/BRO~|~3 span concrete slab deck bridges peir encasement repair on all piers, peirs 1 & Pier 2 (left and right) with no approach pavement work. Clearing and grubbin required on SFN 5704200 MOT SR 49 0621~|~13 - Bridge Rehabilitation~|~FD58E877031D24ED72CB6D71B325BF3D56EB177D 100514~|~1~|~1~|~01/NHS~|~Plan Split for all joint repairs on SU 52 within the project limits.~|~44 - Other~|~DBAC58B11FE7888B3EB7C3EDC0583C59C63A0211 126692~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~711CDCB84F3F517D52CBBD0A178596F7E9175659 118925~|~1~|~1~|~01/S5K~|~Plan split for federally eligible construction items~|~05 - 4R Maintenance - Resurfacing~|~C84C5458E51A068A0170D93EE92D56FD2A72E759 118925~|~1~|~2~|~02/NFA~|~100% Local split~|~05 - 4R Maintenance - Resurfacing~|~2B52052C91AD94BC350E4A1D4F4BF9FD923766F3 117214~|~1~|~2~|~02/S5K~|~resurfacing and related roadway work from 11.96 to 14.62~|~05 - 4R Maintenance - Resurfacing~|~F04E270F6FCAFB821C734E2CDB325714F192EB4C 117214~|~1~|~1~|~01/STR~|~resurfacing and related roadway work from 8.03 to 11.96~|~05 - 4R Maintenance - Resurfacing~|~9BF8449F08DA64D3A0682388B476FAF12F3490E6 117540~|~1~|~1~|~01/NFA~|~ODNR Bridge and Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~D4BE854B3BB494ADCDDBE1C4CAFB7857103C9321 123435~|~1~|~1~|~01/BRO~|~Replace Span Locks for ERI-6-9.67~|~13 - Bridge Rehabilitation~|~A2A993E252ED5DD2E6DE3C3A9DAD53F312D00213 122377~|~1~|~1~|~01/NFP~|~Culver Liner Replacements for GAL SR 7 CFN: 1983098, 1829123, 1829719, 1992163, 1992168, and 1864258.~|~~|~15C38F248E2C653C7F6C6E8011EFC3AA279E8478 102962~|~1~|~1~|~01/STR~|~STP Rural Microsurfacing: MED-421~|~05 - 4R Maintenance - Resurfacing~|~0E72FBB4E4CFBA38E99B72C108378AAFDCCFE1F4 127064~|~1~|~1~|~01/NFA~|~Resurfacing parking lots and drives at Rush Run Wildlife Area~|~05 - 4R Maintenance - Resurfacing~|~A0A522493DE7075900EA2C08012B6887550CDDCB 114542~|~1~|~1~|~01/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~E9A8B60547562B331A0210861FF6CDDD5D754432 114542~|~1~|~2~|~02/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~428E89CCC01C5161BE88192F5D4D6FD22D0FAFA5 114542~|~1~|~3~|~03/S>2~|~Bridge Maintenance Work~|~47 - Bridge Preventive Maintenance~|~A576237B4A23E132511DA652D2D339BCC02E9F9C 114542~|~1~|~4~|~04/STR~|~Bridge Maintenance.~|~47 - Bridge Preventive Maintenance~|~7B957903DDF25EC97152660E3919F2B7776E4062 126216~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~A72B9B1D154FE4FD36BEFECBC4C205E37ED9B384 102325~|~1~|~1~|~01/SAF~|~Pavement marking upgrade of existing on various Mercer County roads.~|~21 - Safety~|~5D6C1BC164741AFC4B6D54917BD9A513A5FD30CA 114819~|~1~|~2~|~02/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~FBC4973A8CC8F643978DCD2E0D78A48A6C855DA3 114819~|~1~|~1~|~01/S5K~|~STP>5 Urban Area plan split~|~05 - 4R Maintenance - Resurfacing~|~4B730C24916DE63C549112E6961C35F4D1DAB907 99753~|~1~|~1~|~01/ENH~|~80% federal pariticipation with 20% local matching funds for the construction of a multi-purpose path using MPO Transporation Alternative Program funding.~|~28 - Facilities for Pedestrians & Bicycles~|~3E7D9117B403F8F361961CD48B19E25D626D90B6 109314~|~1~|~1~|~01/STR~|~CEAO funded bridge rehab of Marion-Galion Rd over Flat Run~|~10 - Bridge Replacement~|~DCC3856774E97E92DE5E19A0B8D2C496C07F4C13 116083~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E1733A3AB13309526306312E4732999C1B5E7DD3 103880~|~1~|~1~|~01/IMS~|~plan split~|~03 - Reconstruction - Added Capacity~|~1D33CD67489E42C1C04E39F3521E2F56DB8B463B 99452~|~1~|~1~|~01/SAE~|~Guardrail Replacement project with 100% HSIP (CEAO Safety Funds)~|~21 - Safety~|~E51FDB9FABFDA006113864F33A850E6E9290185A 101936~|~1~|~1~|~01/S<2~|~Plan split for bridge Other Federal Hwy - Major Collector.~|~10 - Bridge Replacement~|~2411078CA946C76C596C2A34C906732189441085 123653~|~1~|~1~|~01/IMS~|~All work associated with the resurfacing of IR 270 and IR 71.~|~05 - 4R Maintenance - Resurfacing~|~70795982A1CA23DBC9BF3771D9F27032BAB3F13A 96262~|~1~|~1~|~01/SAF~|~This split uses federal Safe Routes to School funding and uses Toll Revenue Credit to bring the federal percentage to 100%.~|~28 - Facilities for Pedestrians & Bicycles~|~437E4A8944E7FCA967D44454BCADAEC8157D7C50 122791~|~1~|~1~|~01/SAF~|~All roundabout work included in this split.~|~21 - Safety~|~03ACB98C2D7FDF26E0887676628739A94B8EBB1B 127180~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~21AEA10B03F86E38F06C2F9A72F11786308ED203 97261~|~1~|~1~|~01/STR~|~Landslide repair project by installing a Hpile retaining wall.~|~04 - Reconstruction - No Added Capacity~|~63D710F38A0FD295875351985EB77EFD47E74A55 116774~|~1~|~1~|~01/NHS~|~HUR US 0250 12.91~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2EC14264FDA470948F7AB130D31E03918BF66DC3 100204~|~1~|~1~|~01/IMS~|~Replace loop ramp with flyover ramp~|~01 - New Construction~|~A0D5D01546BC0303FECDF54A3D298969BDA38185 110435~|~1~|~1~|~01/NHS/HEAT~|~Resurfacing of SR 79 within city of Heath.~|~05 - 4R Maintenance - Resurfacing~|~BF1547B1709D3AB67D4AF48CAFF99BA8E9805E92 100184~|~1~|~1~|~01/S<2~|~Work on CR 236 from SR 568 to US 224. 80% federal STP funds from the City of Findlay budget. The 20% non-federal match will be provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~1D78453F202B64AE9B3C9D45065A250E26E08D6A 117964~|~1~|~1~|~01/S50~|~Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~A7F0BAEAD6301BDC2E7F3379608C47D8BBEC796D 103282~|~1~|~4~|~04/STR~|~Resurfacing of POR SR 88 from 2.54 to 4.03 and POR SR 303 from 17.77 to 17.78.~|~05 - 4R Maintenance - Resurfacing~|~158C76D6A9248BA40FCEB0FA479DA45FBD6ECC4B 103282~|~2~|~8~|~08/STR~|~Replacing linked structure > 20' span.~|~10 - Bridge Replacement~|~2E52B6B8BCC7F5CF25BBA3EBED0D621F6FDF27AD 103282~|~1~|~3~|~03/S>2~|~Resurfacing of POR SR 88 from 1.51 to 1.96 and 2.08 to 2.54.~|~05 - 4R Maintenance - Resurfacing~|~6AA4040AAF874995AF4E1B834AE51A746022ECAE 103282~|~1~|~1~|~01/S>2/RAVE~|~Resurfacing of POR SR 88 from 0.00 to 1.51 and 1.96 to 2.08 in the City of Ravenna, Urban Paving 80/20.~|~05 - 4R Maintenance - Resurfacing~|~8FF297F7710DE12E36EFD4EDDA8A2F8B31B5007D 103282~|~1~|~2~|~02/S>2/RAVE~|~100% City items in Ravenna~|~05 - 4R Maintenance - Resurfacing~|~7836D7CF734C80CB6038DE80AD7D12F8F7B77AF1 103282~|~1~|~7~|~07/S>2~|~See linked structure 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~5DF63A7113E7ABF520EA03C9AEC2BFA541633863 103282~|~1~|~5~|~05/S<2~|~Resurfacing of POR SR 303 from 17.78 to 20.63.~|~05 - 4R Maintenance - Resurfacing~|~8B4781E763907A772FA68EA12371402D37355BB6 103282~|~1~|~6~|~06/S<2~|~Minor bridge work to linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~CF77EEAE7AD12085687602EBCD20AB077A446BB9 103282~|~3~|~9~|~09/STR~|~Resurfacing POR SR 44 from 22.14 to 24.05, POR SR 82 from 9.40 to 10.62.~|~05 - 4R Maintenance - Resurfacing~|~BF03B3DB6C42F19223C1A37274954DCF974FC54C 103282~|~3~|~10~|~10/NFA~|~Resurfacing of SR 282 from 0.00 to 2.69.~|~05 - 4R Maintenance - Resurfacing~|~9937E0F74C6B375F86DC63E11266C592B18E6650 113593~|~1~|~1~|~01/IMS~|~This plan split are for those pay items on the interstate highway system.~|~21 - Safety~|~58BAAE5DAED0CAA918E5E506ABD10D450AD21CE8 113593~|~1~|~3~|~03/S<2~|~This plan split are for those pay items on the other federal aid system.~|~21 - Safety~|~E323D4A21C69501255B1C93017A4AD7BE134CB5D 113593~|~1~|~2~|~02/NHS~|~This plan split are for those pay items on the NHS system.~|~21 - Safety~|~D70676EAA6345CD1F356CDABDA0CEE4203EB9DC6 113593~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~B8535D81A80126F1A617E1A8AD333BFCEA0F396E 97462~|~1~|~1~|~01/NFP~|~This is the district's annual systematic RPM replacement project~|~21 - Safety~|~4FBE126AB2681A187CE2A5453CF844EC3C4C5916 122288~|~1~|~1~|~01/BRO~|~Bridge work.~|~13 - Bridge Rehabilitation~|~5B51C5AE910583FB244B3338F3B877CC0B03B8B4 115800~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~99AA02C727F4F9551CFE1DDAF9A8843C0239C57A 102389~|~1~|~1~|~01/SAF~|~Pavement marking project foy FY2022. Funded 100% state.~|~21 - Safety~|~450AFB3A57AA35298D603D0FA69420E880464299 100344~|~1~|~1~|~01/STR~|~All work in this project. All funds from the District Preservation Program budget. 80% federal SAC 4PF7 and 20% state SAC 4PS7. No local funds. The federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~677720A2236972133F0DD5804B5E5810E7F92AC9 109923~|~1~|~1~|~01/NFP~|~All work is in this plan split. Funding is 100% State funding using SAC 4PS7.~|~21 - Safety~|~A5E63CDA42A01F8AA304AFB7400CACBE501BEE18 114940~|~1~|~1~|~01/S>2/YOUN~|~Resurfacing, urban paving in the City of Youngstown.~|~05 - 4R Maintenance - Resurfacing~|~BC1E89014DC785C4C62824A79B1D2E0E90F5813B 114940~|~1~|~2~|~02/S>2/YOUN~|~Full and partial pavement repairs and ADA curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~FF7FB82CABC60E687244151EF5E02B8ACE65B18B 94220~|~1~|~1~|~01/NFP~|~District Preservation 4PS7 (100% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~78821A9F24C1F6AFFD8BF1EC4732495E248DDC7E 102709~|~1~|~1~|~01/STR~|~Resurfacing on SR 93 and minor bridge maintenance work.~|~05 - 4R Maintenance - Resurfacing~|~48E4DE6343AA15824414C1D983354656E91DC42B 102709~|~1~|~2~|~02/STR~|~Resurfacing, roadway edge repair/replacement, guardrail upgrade, and associated bridge maintenance.~|~04 - Reconstruction - No Added Capacity~|~865A2F3C0F35A85F6256CE4CB267A186879C3CFC 80123~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~CDA818BEB77F97BCC86C8D45D3608ADC2E0C55B8 107569~|~1~|~1~|~01/NHS~|~Resurfacing SR 7~|~05 - 4R Maintenance - Resurfacing~|~4A9CB953F8BF2B421014BF067C66F64FC8717B33 123810~|~1~|~1~|~01/BRO~|~Bridge Hit~|~13 - Bridge Rehabilitation~|~C25C8EF5C4AEA8AF85EE255CAAB8C0E70893FB5A 125877~|~1~|~1~|~01/CMQ/STOW~|~Install new roundabout.~|~21 - Safety~|~CD62F2314691E885815A4CB4AC09A8966F8B6D0D 92389~|~1~|~1~|~01/BRF~|~McColley Covered Bridge preservation awarded through NHCB as it is a Historical Bridge SFN 4631137 LOG CR 13 0158~|~32 - Historic Preservation~|~DC46A66D03656A3680591E6A33C82CE767FC8A5F 92621~|~2~|~2~|~02/MPO~|~Corrected plan split for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~3DD7A2C6303E3C832599EF4ABD03ECEB2294C4F7 92621~|~1~|~1~|~01/MPO~|~Mill & Fill~|~05 - 4R Maintenance - Resurfacing~|~B5D850824DAAFA18139DDD88AA757096D8E20744 89905~|~1~|~2~|~02/SAF~|~Plan Split for all Greater Cincinnati Water Works utility work along SR 264. All items to be paid 100% by GCWW.~|~21 - Safety~|~31065BF4AD07426D26E6EB64FB41245F4BEDCBC4 89905~|~1~|~1~|~01/SAF~|~Widen Westbourne Drive to provide dual left turn lanes to go north on SR264 and widen southbound SR-264 to provide a right turn lane at Westbourne, which will extend thru the intersection of Lawrence Road~|~21 - Safety~|~E64C641AB216C7AB4EA5DEF2F2E65ABD8B0C7EFB 114785~|~1~|~1~|~01/NFP~|~Guardrail repairs on various routes throughout District 4.~|~21 - Safety~|~682CF66E36804C6DB5E5142518656873C3BEF9DA 107256~|~1~|~1~|~01/NHS~|~Landslide repair project. GAL 35 13.07. GSM funded. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9F8E37EB4E7145774C4B4E0425835E123276BB65 95223~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a chip-seal treatment. ATH 329 0.00-12.19, 13.66-19.65, MRG 329 0.00-3.79, VIN 677 0.00-4.33. Rural Federal Aid route, 80% Federal/20% State funded.~|~05 - 4R Maintenance - Resurfacing~|~5A9B4F676C4B5FFE487603474CDE3F5CB8B1C15C 95223~|~1~|~2~|~02/S<2~|~Two-lane resurfacing project using a chip-seal treatment. VIN 683 0.00-0.37. Urban other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~057A2583E28B7004EAA142297505F51C5D4C5F47 95223~|~1~|~3~|~03/NFA~|~Two-lane resurfacing project using a chip-seal treatment. VIN 683 0.37-8.22. Not on the federal aid system funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~AA5F94A3DF56E2CA6E7A09443E789A0F663E7590 98890~|~1~|~1~|~01/IMS~|~Funding for replacement of superstructure on two bridges (TUS-77-0527 L & R, SFN 7902190, 7902220) carrying IR 77.~|~10 - Bridge Replacement~|~74456764EEEAFA9746E5CEEC7F3D0CF49222C32C 98890~|~1~|~2~|~02/NHS~|~Replace pavement on US 36 (Westbound) under TUS-77-0527 bridges to provide required Vertical Clearance.~|~04 - Reconstruction - No Added Capacity~|~67E661C3B551F409A5ECCE446D8F13024D5FDE1B 96773~|~1~|~1~|~01/STR/ADA~|~It is proposed to replace the Old State Route 32 bridge on CR 100 at SLM 4.035 SFN 0137308.~|~10 - Bridge Replacement~|~9C60D68D3B8AFFB0BDC01B59E73471D15F2858CE 125521~|~1~|~1~|~01/BRF~|~Primary plan split to rehab existing structures~|~13 - Bridge Rehabilitation~|~07F2A2A106BC7504A6F445A80E53CB679A8D6594 88304~|~1~|~2~|~02/STR~|~Plan split for DEF-2-0.52 using 100% state funds. Bridge is NOT eligible for federal BR funds.~|~13 - Bridge Rehabilitation~|~50145B6DE276E98CC60ADE75D7E06A6EF07535A9 88304~|~1~|~1~|~01/BRO~|~Plan split for DEF-49-0446 which is eligible for federal BR funds.~|~13 - Bridge Rehabilitation~|~649889F9BFC7BA367DDAEF19E1615BEAAA4AF38F 91856~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehab abutments and overlay of SFN 2301237 FAI SR37 7.36 Intersect: Walnut Creek: BR Eligible: Length=119 SD/FO(1) SR=36.7 DSR=5;~|~13 - Bridge Rehabilitation~|~8A3790599FA3FA44E6CB5FD4A002A564294F16DA 91856~|~2~|~2~|~02/S<2~|~"02/S<2/BR/ " - District Preservation 4PS7(100% State) - No CAP - Rehab abutments and overlay of SFN 2301326 FAI SR37 19.62 Intersect: Tributary Of Raccoon Run: BR Eligible: Length=67 SD/FO(1) SR=69.8 DSR= 6~|~13 - Bridge Rehabilitation~|~EF11A3B9CA204707FC38734E4FC69E081BD47A11 93812~|~1~|~1~|~01/NFP~|~100% state funds (4mp7) for district wide rpm replacement.~|~21 - Safety~|~7587F54C3227534832EC7F5B4F8C787D26AC80A5 127143~|~1~|~1~|~01/NHS~|~Repair damage from over height vehicle strike.~|~04 - Reconstruction - No Added Capacity~|~1C50517BF182D6449D9EFF272B412003A1470B29 105392~|~1~|~1~|~01/STR~|~CO STR CV funding split established.~|~44 - Other~|~C23F1D4C7C2EFC3B0BD5E1394B0A2A82F1BDCBB7 105392~|~1~|~2~|~02/S>2~|~CO S>2 CV funding event established.~|~44 - Other~|~F4F5EBDC062E4510686A7204253BDD300174F7AF 105392~|~1~|~3~|~03/NHS~|~CO NHS CV funding split established.~|~44 - Other~|~37D0387F78B08E4EDBEFDC2173FDA96D4831E436 104989~|~1~|~1~|~01/NFP~|~District Preservation Pavement Funds - 4PS7 (100% State) - No Cap - Spot Paving and repairs on selected OFAH-Rural Roadways in District 5~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4E60C8F0A0A133DCD892E0CF3943BB233719014 107125~|~1~|~1~|~01/S>2~|~Urban Paving - City of Springboro - Southern Corp to SR 73.~|~05 - 4R Maintenance - Resurfacing~|~C6B333A8BBFE96698FDEBB3747008B2A27225937 107125~|~1~|~2~|~02/S>2~|~Items to be covered 100% by the City of Springboro.~|~05 - 4R Maintenance - Resurfacing~|~DB4BB193EACE78F0016506A657E37CCBEDA98230 107495~|~1~|~1~|~01/STR~|~Resurfacing CAR-644, COL-39 and COL-644~|~05 - 4R Maintenance - Resurfacing~|~F41B6E36A475C61909D7A286F644AD68BD710B90 104981~|~2~|~2~|~02/STR~|~Bridge replacement of SFN 4501837 (LIC SR 37 19.38)~|~10 - Bridge Replacement~|~0289ACE9EA56C4F7FB6D048A26F2CC87357407F5 104981~|~1~|~1~|~01/STR~|~Replacement of LIC-37-18.94 (SFN 4501810)~|~10 - Bridge Replacement~|~1233D1C1C6CA1061685866C02FD9FA3E1B056D09 110133~|~1~|~1~|~01/STR~|~Repair work on GRE-343~|~05 - 4R Maintenance - Resurfacing~|~421F85F7AFC56C1038B4EED3257D36ACBE1ABECD 117197~|~1~|~1~|~01/STR~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~9D8C37FB391CCA9E75653110D33F423F1DF578E9 99366~|~1~|~1~|~01/S>2~|~SFN 1200615, CLA-40-0068 on Mud Run - Bridge repaior and rehabilitation by refacing forward abutment, rebuild deck corners with anodes, repair bridge deck, pothole repair and reseal approach slab to bridge joints and seal deck wearing surface with SRS C&MS Item 705.24.~|~13 - Bridge Rehabilitation~|~763100DD571BF495702A72AF848E2001FD2975F6 99366~|~1~|~2~|~02/NHS~|~SFN 4600223, LOG-33-0641 on the Great Miami River - Remove asphalt wearing surface and waterproofing from non-composite box beam structure (non-composite) system with strip seal expansion provision.SFN 4600215, LOG-33-0641 L - remove the existing substructure.~|~13 - Bridge Rehabilitation~|~F7A11FEDF779612F4AD2CDB2F9500CD72F2E128F 127068~|~1~|~1~|~01/NFA~|~Plan Split of ODNR resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~9517699565BAE745A6E284D356DED8E70E77CF44 84048~|~1~|~1~|~01/ENH~|~A railroad visitor center in the City of Fostoria.~|~44 - Other~|~6F6AD9A1228E6BF13FA41AE4D45DA9D8BA29909A 108039~|~1~|~1~|~01/NHS~|~Bridge Replacement.~|~10 - Bridge Replacement~|~7D87D9FF6E48BE6E2FDAD0199558750888CBFC3C 121357~|~1~|~1~|~01/STR~|~Plan split for all work associated with WIL-15-0154 bridge~|~10 - Bridge Replacement~|~A776975A03C424E6F700A50160904893933EB8A0 84584~|~1~|~1~|~01/STR~|~Federal Rural STP funds. Bridge Replacement not eligible for federal BR funds. All funds from the District Preservation Program. 80% SAC 4PF7 and 20% SAC 4PS7.~|~10 - Bridge Replacement~|~6BD2CCCC66EF8B50E270E06F6B025848CD63D36B 107977~|~1~|~1~|~01/SAE~|~Repair to an existing slide on the uphill side of Tealtown Road, by installing a drilled pier retaining wall.~|~~|~481F31AECD06A3F7E0C4F0841593F5E41BF15F2D 106519~|~1~|~1~|~01/NHS~|~NHS Route~|~05 - 4R Maintenance - Resurfacing~|~0D4E9E8F653B8211B4217760835685A9D5A24B7F 115352~|~1~|~1~|~01/MPO/LAKE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~874D340691FE48A25B177AB15EE308D8F7B1E4F2 104802~|~1~|~1~|~01/SAE~|~Install/Upgrade guardrail at various county route locations.~|~21 - Safety~|~F9D43EFEB56261E7448A15BD6A91916A5B02F470 106999~|~1~|~1~|~01/STR~|~Micro milling on pavement surface on sold PID 93877. WAS 60 3.60-19.73 and WAS 60 21.03-24.09. 100% State Emergency funds (SAC 4BE7). Type A Emergency contract.~|~05 - 4R Maintenance - Resurfacing~|~303D1614EACFC1F7093E42D1D9332C807F23FA75 112824~|~1~|~1~|~01/NHS~|~Resurfacing US 250~|~04 - Reconstruction - No Added Capacity~|~095DEAB397C77CEF3E4009EB3225B46067F221EC 113756~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~53A8BDD58808674D4FB49F83863BED228DF40BA7 97195~|~1~|~2~|~02/SAF~|~Improvements on SR-64.~|~21 - Safety~|~0B166B9E669611480743B1EA8B7733582E7F33B6 97195~|~1~|~1~|~01/NFP~|~Lump sum contribution from the local~|~21 - Safety~|~89391479BC0D1986703E2249D7FFA21FFF72A7F2 92401~|~1~|~1~|~01/NFP~|~Facilities work using state 4MA7 funds.~|~44 - Other~|~539A0F426CDBACB170CA6F96AFBDBBD0F3333B98 98006~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~CAE267F1902EE95703B81B876041541AF3E3DAE1 109924~|~1~|~1~|~01/NFP~|~All work is in this plan split using 100% state funds from SAC 4PS7, district preservation funds.~|~21 - Safety~|~CC3523251885D527857B0183A7F24B9F3C5DF775 103059~|~1~|~1~|~01/NHS~|~SCI 52 24.73 Rock removal/barrier in City of Portsmouth.~|~44 - Other~|~42E3B972B48390D0D337D09AB10AD1A37A3F37FF 122296~|~1~|~1~|~01/NHS~|~Plan Split for bridge replacment~|~10 - Bridge Replacement~|~84225529CD8C5FB9C37B6F88599E78D3B0D5099E 122296~|~1~|~2~|~02/NHS~|~Plan Split for work on non-federal bridge~|~04 - Reconstruction - No Added Capacity~|~C3B0462D23E01E671E2E8B6FAA5C0B9241BB1C34 112038~|~1~|~5~|~05/SAF~|~Culvert SafetyCulvert work due to pavement widening.~|~04 - Reconstruction - No Added Capacity~|~0C0DB12124839910B252992E6B875EA5D9EDD975 112038~|~1~|~1~|~01/STR~|~Repair edge of pavement (M2) and resurface pavement (DAP) SLM 8.71-14.48~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CD805BB5B05B37515F7CBD164CE86B98B4721BA3 112038~|~1~|~6~|~06/SAF~|~Install centerline rumble stripes.~|~21 - Safety~|~000CDBE12807FF2CFFC192DD26DBEDA920545534 112038~|~1~|~2~|~02/SAF~|~Safety Widening Split to widen the pavement to 29ft ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF20D837A25DB24442A43BA7FC293425E753D333 112038~|~1~|~3~|~03/STR~|~Bridge PreservationBridge maintenance on GRE-72 1033 & 1175 structures~|~13 - Bridge Rehabilitation~|~6AEE2C6B32B2A2E19C63FACF83A88B3A313E3DB9 112038~|~1~|~4~|~04/STR~|~Culvert PreservationCulvert maintenance (CFN's 1840073 & 1854334)and work on structure: GRE-72-09456~|~04 - Reconstruction - No Added Capacity~|~C0DBB16DE7818AAB76B1E35711CF0760E4C0AEC3 113983~|~1~|~1~|~01/NHS~|~1 3/4" mill and fill with super-pave asphalt~|~05 - 4R Maintenance - Resurfacing~|~3D0F98677E510FD3A520D84E0F5EFE3939AD66D9 126128~|~1~|~1~|~01/NHS~|~Pavement repairs on HAM-126~|~05 - 4R Maintenance - Resurfacing~|~76C55533BD4BAC16A6A81BABCA42DE3EE68B8629 100588~|~1~|~1~|~01/STR~|~D09 Overlay FY24 ~|~05 - 4R Maintenance - Resurfacing~|~44D19F4C5DB3864897F10B96A5D14D16EDDE830A 83779~|~1~|~2~|~02/STR~|~Two-Lane resurfacing project using a Microsurfacing treatment. VIN SR 93 2.15-7.47, 8.75-18.08. Federal Aid route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~3D09FBE851C4E129C00FBC0BB901646EFB6FBC94 83779~|~1~|~1~|~01/S<2~|~Two-Lane resurfacing project using a Microsurfacing treatment. VIN SR 93 0.00-2.15. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~739EFC9E7AC6C2B2D52B8AEB718D6769C355C49A 103900~|~1~|~1~|~01/STR~|~plan split~|~44 - Other~|~B93A7268413B791F5D317AF8F3C65AF63FA1FEB5 100481~|~1~|~1~|~01/STR~|~HIG 134 14.06-18.78ROS 772 0.00-10.35~|~05 - 4R Maintenance - Resurfacing~|~A6A1B52869ED31403F46A7B853484FA8F9538854 114614~|~1~|~1~|~01/NFP~|~Plan split for Signing~|~21 - Safety~|~34ACAAC9EEB0436CD572AF8564B90D52D5296F3A 76849~|~1~|~7~|~07/IMS~|~Removing of Wolf Ledges on-ramp to IR-76 Westbound, in the City of Akron, Summit County, Ohio.~|~44 - Other~|~3678D83639223C6B9D284513A773C160F020DD85 76849~|~1~|~2~|~02/NHS~|~Plan Split for SFN 7701802 SUM SR 59 00.19 over Lakeshore and Russel Ave, SFN 7701810 & 7701829 SUM SR 59 00.44 L&R over Lakeshore, Ohio Canal and Thornton Ave, SFN 7702027 SUM SR 59 01.41K SB on Ramp K over Off Ramp L, SFN 7702035 SUM SR 59 01.42N NB on Ramp N over Off Ramp M, SFN 7702043 SUM SR 59 01.67 over Cedar St, SFN 7701853 SUM SR 59 01.77 Over West Exchange Street, SFN 7701861 SUM SR 59 01.86R NB OFF Ramp over On Ramp, SFN 7701888 SUM SR 59 01.99 under State Street, SFN 7701896 SUM SR 59 02.08 under Locust Street, SFN 7701926 SUM SR 59 02.32 under Bikeway, SFN 7701950 SUM SR 59 Ramp E Over bikeway, SFN 7701918 SUM SR 59 02.37 Ramp WB 59 to Mill St, SFN 7701942 SUM SR 59 02.55 over Ohio Canal Enclosure, SFN 7708629 SUM SR 261 08.20 over SUM SR 59, SFN 7700989, SUM-SR18-9.69 Ohio Canal enclosure.~|~13 - Bridge Rehabilitation~|~5BE01AE02C8A75FE9E9420B05FBFB919E750F639 76849~|~1~|~6~|~06/NHS~|~Plan Split to cover pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~946EC6B2788898987AF4D428C736F456518F76F2 76849~|~1~|~3~|~03/BRO~|~Plan Split for SFN 7701977 SUM SR 59 00.88 under Bartages, SFN 7701993 SUM SR 59 01.15 Under Dart Ave, SFN 7702000 SUM SR 59 01.26 under Euclid Ave, SFN 7701934 SUM 59 02.47 Connector Ramp to Mill Street, SFN 7702051 SUM SR 59 3.17 over CSX RR.~|~13 - Bridge Rehabilitation~|~AC540DEB00FBA42535D03A28B12FAA0AABDEEAA3 76849~|~1~|~1~|~01/NHS~|~Plan Split for Paving SUM SR 59 from 0.00 (Interstate 76) to 2.55 (Howard Street), in the City of Akron, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~AF85BFE30747D1EE460C7FD1CAE1C949E7381DD4 76849~|~1~|~5~|~05/NHS/Akrn~|~Plan Split for Partial and Full depth pavement repairs on SUM SR-59 (Perkins) from 2.55 (Howard Street) to 3.53 (State Route 8), in the City of Akron, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~DB937FA78C5328D8A0646B08E6EDB6D0B18344C6 76849~|~1~|~4~|~04/NHS/Akrn~|~Plan Split for Paving SUM SR-59 (Perkins) from 2.55 (Howard Street) to 3.53 (State Route 8), in the City of Akron, Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~F335AC7E58D31FA015D1870F366F72121BE87330 92976~|~1~|~3~|~03/S>2/PATA~|~"03/S>2/PV/PATA" - District Preservation Urban Paving 4PF7(Federal 80%) / 4BG7 (Local 20%) - No CAP - Urban Paving in City of Pataskala on 1) Lic-SR 310-02.64 to 04.83; 2) Lic-SR 310-04.94 to 05.52;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~60E04FECEA3231CF284670E61E1C0E918CC1139B 92976~|~1~|~5~|~05/NHS~|~"05/NHS/BR/ " - District Preservation Bridge Funding 4PF7 (Federal 80%) / 4PS7 (State 20%) - No CAP - Repair/replacement of pressure relief joint on: 1) Lic-SR 37-11.80 (SFN 4501667); 2) Lic-SR 210-10.05 (SFN 4505751);~|~13 - Bridge Rehabilitation~|~47D9D0C49109CA99C4F123B9FC727903E8A8B8BB 92976~|~1~|~2~|~02/S>2~|~"02/S>2/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Lic-SR 310-01.72 to 02.61; 2) Lic-SR 310-05.52 to 07.88;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7441943B58DBD351B6F5C0662FC07B96B57338CF 92976~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on: 1) Lic-SR 310-07.88 to 10.05;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~15577D2AB7D8146A6AE6E87F648C104C0BE0FF15 92976~|~1~|~6~|~06/STR~|~"06/STR/OT/ " - District Preservation 4PF7 (80% Federal) / 4PS7(20% State) - No CAP ? Traffic signal rehabilitation and related items: 1) Lic-SR 310/Morse Road (SLM 8.54);~|~44 - Other~|~44DA2201F585FB45A6FF1E622B90CF3F325F2D12 92976~|~1~|~4~|~04/S>2/PATA~|~"04/S>2/PV/PATA" - City of Pataskala 4BG7(100% Local) - No CAP - ADA Ramps and other items requested by City~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6AB4D2D62A4CEECC086BE92C4DD72A52ADB45864 105565~|~1~|~1~|~01/IMS~|~FAY-71~|~05 - 4R Maintenance - Resurfacing~|~A28CC90A4A536CE22216023D9129C644564BF429 109690~|~1~|~1~|~01/IMS~|~Resurfacing IR 70~|~05 - 4R Maintenance - Resurfacing~|~4E25E63FADFE0947680E52ABFF9ADFD67F4C325C 107906~|~1~|~1~|~01/IMS~|~FAY-71 and associated bridges~|~05 - 4R Maintenance - Resurfacing~|~8E75143D0E7AC361A952212C5366C476F678AFAC 84629~|~1~|~1~|~01/IMS~|~Plan Split for SFN 7705107 SUM-76-0362 under Clark Mill Road (CR-201) and SFN 7705255 SUM-76-0497 under Summit Road (CR-52)~|~10 - Bridge Replacement~|~1B1B369630390F7838214B68C5B4E17DD712D02E 84629~|~1~|~2~|~02/IMS/BARB~|~Reconstruction and relocation of City of Barberton waterline, Summit County, Ohio.~|~43 - Utilities~|~EA0D6BFAB061A6074E73E10359BEF7EDC1F7ABBE 97860~|~1~|~1~|~01/NFP~|~General construction inspection services on various projects in D10 for FY2014 and FY2015.~|~17 - Construction Engineering~|~309EE0EECF81056460120DC8F27F38FAADD3C86D 89090~|~1~|~1~|~01/SAE~|~Guardrail replacement on various county routes in Mahoning County~|~21 - Safety~|~D415D81EE12A49892B087712A920B58EEE51CAD4 110697~|~1~|~1~|~01/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~183220094401A280BCAF113B5EE0AD4AEAE8D770 110697~|~1~|~2~|~02/S<2~|~Construction Inspection~|~17 - Construction Engineering~|~1B55D660447EB26CDC4460ECA328874EC7106B86 115439~|~1~|~1~|~01/SAF~|~Plan split for intersection safety work.~|~21 - Safety~|~83D66A09BB81B702AB7C1DEDDDDB0D324945EA6F 105503~|~1~|~1~|~01/IMS~|~Plan Split for the interstate routes for the Systematic Sign Replacement~|~21 - Safety~|~C8663DAA09814A52C38525DED47AF47AD1B1BA17 105503~|~1~|~2~|~02/S>2~|~Plan Split for the large Urban route locations for the systematic sign replacement~|~21 - Safety~|~032F98CD748C73DA18FF920DC75CF26AFB3FC8A9 105503~|~1~|~3~|~03/NHS~|~Plan Split for the NHS route (HAM-42) for the systematic sign replacement~|~21 - Safety~|~0630091943606749B0637207D7891D7FFE4DCC66 104026~|~1~|~1~|~01/ENH~|~Rehabilitation of a luden arch type bridge on MOE TR 313 0.04 (SFN 5634555), that spans the Little Muskingum River. Funded 80 federal/15 credit bridge/5 local.~|~13 - Bridge Rehabilitation~|~9A1F8BFB8EF422926911048ED0FB137602EE94A5 107455~|~1~|~1~|~01/S<2~|~Intersection improvement at SR 147 and SR 800; 100& federal funds (80% 4TA7 and 20% TRC)~|~21 - Safety~|~22BF7A72E07C604CC42B32711061BC6E97095264 91947~|~1~|~1~|~01/IMS~|~80/20 Maint. Funds for 1 year~|~21 - Safety~|~8667458EB030AA1442E20438467D37D6572BB065 120391~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~21 - Safety~|~8F6F8E3C645E847849F776B9694C286FAB59073C 120736~|~1~|~1~|~01/IMS~|~Plan Split to resurface the median shoulder to remove the rumble strips from the future SmartLane~|~05 - 4R Maintenance - Resurfacing~|~C8E928E761BB6C7DE7A2A852A1EC87E876C48E6F 123747~|~1~|~1~|~01/STR~|~Plan split at 80/20 for resurfacing work on STP Rural~|~05 - 4R Maintenance - Resurfacing~|~02BBDA10F4B98493EFB6CD7C1274FE374E74AB2B 117314~|~1~|~1~|~01/SAF~|~Pedestrian improvements are multiple locations. ~|~21 - Safety~|~2DE0895F10FC9EFE65BB4F666703B1B3186DFECC 93503~|~1~|~1~|~01/NFA~|~Construct a road extension of Abbott Parkway from County Road 25A west three lane with center turn lane including base asphalt wearing surface along wiht street lighting, traffic control signage.~|~01 - New Construction~|~19571D52177891DA82F1AF4484A086B5C0287E68 125558~|~1~|~1~|~01/BRO~|~Plan split to program project. Revise when scope is complete.~|~10 - Bridge Replacement~|~D3CB232CC0286001D6A67AC9091ED852425AF713 101521~|~1~|~1~|~01/NHS~|~Highway Lighting~|~44 - Other~|~FAB05927C60110A271B281F8C85052FA1E08BA1E 101324~|~1~|~1~|~01/IMS~|~CO CO Contr 01 plan split created for the following Interstate route: FRA-270-43.24-48.47~|~05 - 4R Maintenance - Resurfacing~|~6722DDED18026B36F613F8A260B97DD60587305C 101324~|~1~|~2~|~02/IMS~|~CO CO Engr 01 plan split created for the following Interstate route: FRA-270-43.24-48.47~|~17 - Construction Engineering~|~F931C8A5173AC4BA2DEEEAD7EF7608EC77ADD2C8 100482~|~1~|~1~|~01/STR~|~ADA 125 (9.22-14.71)~|~05 - 4R Maintenance - Resurfacing~|~A6431EBF7D030A79DB45C76840536BDE14927D77 112496~|~1~|~1~|~01/STR~|~Chip Seal~|~~|~33386C284F03C7BD690A59347C70381EEE57CE36 121958~|~1~|~1~|~01/SAF/PAT~|~Turn lanes and signal improvements at the intersection of Broad Street and Taylor Road in Pataskala.~|~21 - Safety~|~C9DA4338F4037890E20552A3D213F30BF1CE7406 111021~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~17 - Construction Engineering~|~7771C213B70FEFFC1E2C292C66179768F1BA593A 101084~|~1~|~1~|~01/NHS~|~Emergency job on BRO 125 7.00-7.60~|~05 - 4R Maintenance - Resurfacing~|~06A1D510DABA5DC95FCCF11E1EE2FC5A56DDC847 100645~|~1~|~1~|~01/S>2~|~plan split for pavement work in the large urban sections:BUT-127: SLM 7.48-13.99~|~05 - 4R Maintenance - Resurfacing~|~9814009CA0569F9FF9F3F8243BA9470E3995A9A0 100645~|~1~|~2~|~02/STR~|~plan split for pavement work in the rural sections: BUT-127: SLM 13.99-21.06~|~05 - 4R Maintenance - Resurfacing~|~D2E8BBC9813695A63B278E282EA847706019D1A1 103632~|~1~|~1~|~01/IMS~|~Concrete pavement repair to SUM-IR 77 from 15.18 to 15.86.~|~05 - 4R Maintenance - Resurfacing~|~9209906D942B8C7B7EE0959AD2E4CBE959BC6543 103632~|~1~|~2~|~02/IMS~|~Joint repair to linked 20'+ structure.~|~13 - Bridge Rehabilitation~|~91B59A470F5D7CE51FB14C923A8CF06E1D198D4D 127081~|~1~|~1~|~01/NFP~|~Plan split for pavement markings on priority and general system throughout the district~|~21 - Safety~|~44E03960A17DF3F26582098DFDE98B84E72CCC75 124123~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 160 17.37 (SFN 2702347). Funded 80 Federal/20 State.~|~10 - Bridge Replacement~|~D5E222A2E3828B26CC1B232A4101EAB38E8E2B9C 94498~|~1~|~2~|~02/BRO~|~Bridge repair project. Work includes pile encasement and deck patching. ATH 78 0752 (SFN 0502820). BR eligible funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~705F355A528A3294ABF91BE343901C07736744BB 94498~|~1~|~1~|~01/STR~|~Bridge repair project. Work includes pile encasement and deck patching. ATH 144 0141 (SFN 0503061). Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~B40BCA94FDB33472E140A59583B6F7D2295D72E7 109523~|~1~|~1~|~01/SAF~|~intersections and signals~|~21 - Safety~|~A7E26A11415921864E7E1CA41D52243CE28CCE58 109523~|~1~|~2~|~02/ENH~|~Non-safety items, 100% LPA~|~21 - Safety~|~2B8F0C927DA7C56BD72E477B7DC104729C325281 110758~|~1~|~1~|~01/S>2~|~Split for the federal eligible work~|~05 - 4R Maintenance - Resurfacing~|~B82BFA0B0F30560D55305435C351BC208066EDCB 110758~|~1~|~2~|~02/NFP~|~Plan split for non-eligible work items at 100% local cost. ~|~05 - 4R Maintenance - Resurfacing~|~DFED5DD2C0C85ECAC81AFA400EDC04634192F888 126225~|~1~|~1~|~01/BRF~|~Bridge rehab (deck replacement) Local Major Bridge funded FY 2029.~|~~|~40B1F22B3CEF940760E976C1F263C38BE1E8E944 96663~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using as asphalt overlay treatment with repair. MOE 379 4.57-6.05 and NOB 513 9.46-12.45. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~95CDD7F61F39172855206F2436DFF1300C355675 96663~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using as asphalt overlay treatment with repair. MOE 379 0.00-4.57, 6.05-8.07 and NOB 513 0.00-9.38. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~A2F4F390B6D0A705C959B15CA3F1F0F1ACC955AB 105926~|~1~|~1~|~01/MPO~|~Work eligible for federal-aid.~|~28 - Facilities for Pedestrians & Bicycles~|~5AFA30C6344A053B5AFAC5B651C9AAF9655BCD4F 83823~|~1~|~1~|~01/STR~|~Preventative Maintenance on the General System for FY2013~|~47 - Bridge Preventive Maintenance~|~334B51B85840082CBBD08CB1D4CDC9EBD8F76E07 92858~|~1~|~1~|~01/MPO~|~Added plan split~|~17 - Construction Engineering~|~244DA17C138B8C8E9E6E0CA13A54691A0228F768 106125~|~1~|~1~|~01/S>2~|~Washington Street Bike Path in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~CA197B2C69C961EB78BB6745A0C0F2FA7F7DCD4C 114180~|~1~|~1~|~01/NFP~|~Crack seal locations in D-2~|~99 - State Preventative Maintenance~|~44640D79E3277E486525E1A35A90F52AA3C1C18F 124025~|~1~|~1~|~01/IMS~|~Plan split for non-federal bridge repair on interstate system~|~04 - Reconstruction - No Added Capacity~|~5D2A8DE207FF2E6D6169597178E7012716A75B41 124025~|~1~|~2~|~02/NHS~|~Plan split for federal bridge culvert repair on an NHS route~|~13 - Bridge Rehabilitation~|~210495D63D7ED93D9EA1F77EDF9FE34CBE20897C 124025~|~1~|~3~|~03/S>2~|~Work for non-federal bridge rehabilitation on other federal aid route urban area.~|~66 - Resilience Improvement - Highway Project ~|~795D3712C5F6B0ACC579D96CD45E568406F4433F 91594~|~1~|~1~|~01/TRN~|~Mahoning Rd underground conduit installation~|~~|~23C988201E277DDAD62A98DC4B8890C64AF3B7D6 124869~|~1~|~1~|~01/NFP~|~2-Year districtwide lighting maintenance and repair. Includes LED upgrades.~|~21 - Safety~|~B00CDEC867FA803895AB6DC15542B23258B14D44 119167~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay treatment on GAL 35 13.36-17.68 and GAL 735 0.00-1.41.~|~05 - 4R Maintenance - Resurfacing~|~C5FF524FFC61E1001FA1ED10387870F79666F060 110524~|~1~|~2~|~02/NHS~|~Bridge Plan split~|~13 - Bridge Rehabilitation~|~01911B8D9244AD690990A72F25BFDD940D61E5D8 110524~|~1~|~1~|~01/NHS~|~Pavement Rehab plan split~|~04 - Reconstruction - No Added Capacity~|~D5038CCD49CA10671C94133BA166FF0FE2E33598 110524~|~1~|~3~|~03/NHS~|~Plan split for removal of structures HEN-6-1226L&R~|~40 - Special Bridge~|~283586F94F69927793014F325EB58BAF53063F75 119163~|~1~|~1~|~01/STR~|~Resurfacing using an asphalt overlay treatment. ATH 124 0.377-4.493 and MEG 681 10.18-28.949. Funded 80% Federal/20% State.~|~05 - 4R Maintenance - Resurfacing~|~D9A6CBC15F392574A44E448097BED93707D2071C 99038~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for week control on US 33 on 4 lane and 2 lane~|~44 - Other~|~4E6D603CD4394B7BC453E3EA899BCFEC211C6EAE 93561~|~1~|~1~|~01/IMS~|~Bridge deck overlay, pier patching, parapet retrofit, conversion of abutment to semi-intergral, and painting of beams on SFN 5503450 MIA 75 1995.~|~13 - Bridge Rehabilitation~|~88128BF2132FD279257DC64479B3CDC6CD404AAD 102984~|~1~|~1~|~01/NFA~|~Smooth seal on Non-Federal route: SHE SR 119 SLM 9.44 to 15.72.~|~05 - 4R Maintenance - Resurfacing~|~0EC15D31945D1844A7DB0D85F317AECA8CA684E8 102984~|~1~|~2~|~02/STR~|~Smooth seal on rural route: SHE SR 119 SLM 9.35 to 9.44.~|~05 - 4R Maintenance - Resurfacing~|~08125AD117237D70DF626864E3877C3F44C30C2B 107931~|~1~|~1~|~01/STR~|~All work in this split. Resurface on SR 235 using district preservation funds (80% Fed and 20% state).~|~05 - 4R Maintenance - Resurfacing~|~7EB6823D50811CF9ED8728CD84F71ABE877127E1 121044~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~1702603BD33CC1D1577FBEE6F47857680B76EA8F 107924~|~1~|~1~|~01/IMS~|~Widening of linked structure > 20' span.~|~13 - Bridge Rehabilitation~|~DDA2FF49225F73E87480837AEECCF5A5CC4B6F2A 105768~|~1~|~1~|~01/MPO/Whit~|~Improve intersection of Broad St at Hamilton Rd~|~04 - Reconstruction - No Added Capacity~|~B2E4B5B4ED760A10AB351A526D79EB9F4A14AAA5 122057~|~1~|~1~|~01/S50/MAN~|~Improve signal visibility by replacing the span wire installation with mast arms and add backplates/supplemental signal heads at Trimble Road in Mansfield. Upgrade pedestrian accommodations with high visibility crosswalks and new crossing on the east approach~|~21 - Safety~|~9EDDB40EEE6FB7D6159D8F89D8A5984E9D82BEB3 106386~|~1~|~1~|~01/STR~|~Event OH17-01. Landslide repair projects. DSR ATH-005, ATH CR 42 3.74. Funded 80 federal/20 local.~|~~|~D8F2A9FCE9EC525F5BD9E086997C0DA065E0F3DD 118821~|~1~|~1~|~01/S>2~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~71B036767468733DEB21F7A6E32D321564D934D5 118821~|~1~|~3~|~03/STR~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~49E382EA0AD04B582A9B27CA8BBD2C16B58E9268 118821~|~1~|~2~|~02/S5K~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~B0D933DD55F5A29790CE84A8F13167FD6DDDD0CA 118821~|~1~|~4~|~04/NFA~|~Chip seal.~|~05 - 4R Maintenance - Resurfacing~|~0C18E664F621D36B7B68FC8A54A1D88F84BDAF6D 99608~|~1~|~1~|~01/NFP~|~Herbicidal Spraying~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EAC07E18C5260421ED4EA503691E06D08504A4AA 98577~|~1~|~1~|~01/SAF~|~Project includes replacing existing non-standard guardrail, and installing new guardrail where needed. Berm work will be performed and guardrail will be added where vertical drop-offs are a concern.~|~21 - Safety~|~1873C88A2507528B49C982AA5153BB095DEDB35F 96721~|~1~|~1~|~01/NFA~|~Ashtabula County SR 11 SB, build 3,000 ton Salt Storage building to be shared with Trumbull County~|~~|~2336C794FD8E2953C6AF0E4B466EE28EDE077FB4 93947~|~1~|~1~|~01/NFP~|~District wide RPM plan for the FY 16 systematic RPM replacement project using 4PS7 sac code.~|~21 - Safety~|~E00C44B88D71436F62A85295AB5E78602F381EA3 77922~|~1~|~4~|~04/STR~|~Plan split for all roadway work including resurfacing on CLI-729~|~05 - 4R Maintenance - Resurfacing~|~05C4422E4F98BD62B15A2444F1E879C6A0FC74B7 77922~|~1~|~1~|~01/STR~|~Replace culvert SFN 1870603 and bridge SFN 1403664~|~04 - Reconstruction - No Added Capacity~|~201B0175CA8970211A59C436EC2DA4D3DEBBAC0B 77922~|~1~|~3~|~03/STR~|~Replace the existing superstructure of Bridge No. CLI-729-1329, SFN: 1403788. Replace the superstructure of bridge CLI-279-1588, SFN: 1403877. ~|~13 - Bridge Rehabilitation~|~ADC6820378C0FEB67EC00DB73E958A1CB0F7494C 77922~|~1~|~2~|~02/STR~|~Plan split for bridge replacement, structure CLE-729-0935 SFN: 1403729.~|~10 - Bridge Replacement~|~AC1B106805CA4740FD31F411B85E2A72565BB315 98953~|~1~|~1~|~01/S>2~|~Woodruff~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B47E6E946D1CD6A6AB21F2D3BF9950AE5011B1E1 93192~|~1~|~1~|~01/NHS~|~Rock slope failure to be remediated by laying the slope back with benching. Federal Disaster OH12-01 DSR JEF-001.~|~04 - Reconstruction - No Added Capacity~|~D3241DE6887E611A61F0851979725AD44E7BF04D 77916~|~1~|~1~|~01/STR~|~Replace existing superstructure and widen Bridge No. BUT-126-0533, SFN: 0902527. Bridge carries SR 126 over Camp Run.~|~10 - Bridge Replacement~|~E0201FFE719115EE5A67A77AF6ABAC6DA74B321C 102350~|~1~|~1~|~01/IMS~|~Double Microsurfacing of POR IR 76 from 13.55 to 19.34~|~05 - 4R Maintenance - Resurfacing~|~B362681DE8C0FF81116EB3D27B2A47F7F21A987A 102350~|~1~|~2~|~02/STR~|~Microsurfacing of POR SR 14 from 25.41 to 28.77 and POR SR 183 from 3.00 to 7.61~|~05 - 4R Maintenance - Resurfacing~|~9D10AD6051BA15579445FB3E3FF8DD54A1D98B67 94893~|~1~|~2~|~02/STR~|~Bridge split for asphalt replacement:SFN 5101999 MAR-37-1.71 Intersect: Paw Paw RunSFN 5102022 MAR-37-2.55 Intersect: Paw Paw Run~|~05 - 4R Maintenance - Resurfacing~|~62F2A53F21983F20004329F63C588C397D3F93C1 94893~|~1~|~1~|~01/STR~|~D6 funding for resurfacing of MAR-309, 0.00-3.31~|~05 - 4R Maintenance - Resurfacing~|~6C5B1885A40A71F22CD3107662503B5D0A9E0B8E 93698~|~1~|~2~|~02/NHS/FIND~|~This plan split is for pavement repair inside the City of Findlay on sections of US 224, SR 12 and SR 37 that are on Main Street. This work is 100% locally funded. All the funds are provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~AADA2453C02D4062F9AD49E0D54C00D5EA315AFB 93698~|~1~|~1~|~01/NHS~|~This is for resurfacing inside the City of Findlay on sections of US 224, SR 12 and SR 37 that are on Main Street. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Findlay.~|~05 - 4R Maintenance - Resurfacing~|~E9AEDD73FEC54B42412A55F87435B797BCAD289F 124847~|~1~|~1~|~01/NHS~|~Culvert replacement NHS~|~44 - Other~|~173B8BD212D79A4A55B978474406467F868955B5 124847~|~1~|~2~|~02/STR~|~Culvert replacement STP Rural ~|~44 - Other~|~D0C784F7EDD469E350FF427DE0C3452E6E4BECB9 93798~|~1~|~1~|~01/S<2~|~Emergency Type A project. Bridge repair work on ATH 682 0.14, SFN 0504750. Funded 100% state.~|~13 - Bridge Rehabilitation~|~5F09684D39B2DDE204429CECE05048BA241A7B2E 122233~|~1~|~1~|~01/NFA~|~NEVI Round 2 SR-13-B~|~~|~1822C173A130BBE2F4C457C4B2BF6623045550AD 122233~|~1~|~2~|~02/NFA~|~NEVI Round 2B SR-13B~|~~|~B774AF27B950778031529A6D3FF1960027A1A6FF 104940~|~1~|~1~|~01/STR~|~plan split~|~44 - Other~|~1CA1139302626F5FD9F5B3BF87EAB158FCE179B0 88842~|~1~|~2~|~02/S<2/FOST~|~This split is for SR 18 inside the City of Fostoria. Federal STP funds are used. The City of Fostoria is responsible for the 20% non-federal match.~|~05 - 4R Maintenance - Resurfacing~|~059BFB9777BBA9D9AA580759622441466CC50654 88842~|~1~|~1~|~01/NHS~|~This split is for SR 12 outside of the City of Fostoria. Federal NHS funds are used. ODOT District One is responsible for the 20% non-federal match. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~75A38687D4488E7025E5E14682333A34BB3DB46A 88842~|~1~|~3~|~03/STR~|~This split is for SR 18 & SR 613 outside of the City of Fostoria. Federal STP funds are used. ODOT District One is responsible for the 20% non-federal match. There are no local funds in this split.~|~05 - 4R Maintenance - Resurfacing~|~A032623F4BCABD0ED44C6D6FD7098DA362EB40CE 88842~|~1~|~4~|~04/NFP/FOST~|~Items paid 100% by the City of Fostoria such as auxilary pavement parkings, full depth pavment repair, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~A06CEE9ED8714B2479351716D0FF51B087A21C35 91840~|~1~|~1~|~01/STR~|~General system asphalt overlay on COL-344-3.06 to 4.56; includes pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~DE1D1FC6E1CC926CBA8CE653714F2A4159F48C3C 91840~|~2~|~2~|~02/S<2~|~General system asphalt resurfacing on COL-164 SLM 22.23 to 24.31 and COL-344 SLM 2.79 to 3.06 and SLM 4.56 to 8.35; includes pavement repairs and pavement marking.~|~05 - 4R Maintenance - Resurfacing~|~59BD882D86506F4429DDD31B8789831F6E554B08 91840~|~1~|~3~|~03/S<2~|~Work added as requested by the Village of Leetonia and funded by the Village.~|~05 - 4R Maintenance - Resurfacing~|~8A4974840FD0009E9ABBA6CB0FD5DC220113E50B 117990~|~1~|~1~|~01/NFA~|~Bridge Rehab - including a new superstructure, widening the existing abutments, and associated approach roadway work~|~13 - Bridge Rehabilitation~|~93323216CD9B6ECC10B87A42E6ECE6A795FA32A9 98518~|~1~|~1~|~01/SAF~|~Intersection improvement to include turn lanes, signal reconstruction and sidewalks~|~21 - Safety~|~D77CF92C8389D0E93E3DA2FD8C5B0B0D710FB21A 88905~|~1~|~1~|~01/S>2~|~Plan Split for STA SR 687 from 0.36 to 2.57.~|~05 - 4R Maintenance - Resurfacing~|~C047021146D2C71266AEDD502345A11183B000E9 94149~|~1~|~2~|~02/NFP~|~Plan split to cover all costs associated with culvert replacements / rehabilitations with spans less than 10 feet.~|~04 - Reconstruction - No Added Capacity~|~10939C36988F124C8F0EC3BF1A224D42F4BA55EB 94149~|~1~|~1~|~01/NFA~|~Funding split to cover slope stabilizations, associated guardrail costs, and any other costs not covered by other funding events.~|~44 - Other~|~2890FB466EF6F0C73F655F949168E66AC2521598 94149~|~1~|~3~|~03/NFP~|~Plan split to include all costs associated with the rehabilitate Bridge size twin culvert BUT-748-0148 (SFN 0904198).~|~13 - Bridge Rehabilitation~|~D7764C7FBACE31A74C8AD57299F29DCE24E18448 112138~|~1~|~1~|~01/NHS~|~Replace superstructure on slab bridge JEF-7-1574 L (4100905) carrying Ramp B over SR 7 SB with new superstructure. The substructure units will be repaired.~|~13 - Bridge Rehabilitation~|~F5C184CF1CCAF5BDFB7575550D229E33B04C81B4 108129~|~1~|~1~|~01/STR~|~Slide Repair on PIK CR 50 3.32 OH16-01~|~04 - Reconstruction - No Added Capacity~|~271D3ED2FBB16B88D145C30885B74C1698ABD3FC 101940~|~1~|~1~|~01/NFP~|~Construct noise wall along US 33 east of Bowen Rd (SLM 31.04) to just past FRA/FAI county line (SLM 0.13).~|~44 - Other~|~F8159DF6CC99EBC01C7D5CD2FA25532C313F8E53 122888~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~4D295EE4084D60B880FE537F953DFDDEF5229FBC 120703~|~1~|~1~|~01/S>2~|~Federally eligible rehabilitation work on Bunts Road~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~76AB4048F23B271500351C95A8BB503275A27DDF 120703~|~1~|~3~|~03/NFP~|~non-federal eligible work items~|~43 - Utilities~|~A8ED1A5AB562832D501765D1ED62B83B2EF90B5B 120703~|~1~|~2~|~02/ENH~|~Plans split for work associated with construction of shared use path.~|~28 - Facilities for Pedestrians & Bicycles~|~4258E07FE7B9A38D796836B2596493B979EA7D2E 101380~|~1~|~1~|~01/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~488BBED106BC94D50FC82C484472A6AAA330A273 101380~|~1~|~2~|~02/NHS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~01680488FCCADF431EF8154372A54AF29BD8BF82 101380~|~1~|~3~|~03/S>2~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~DC11974E030ACB7CDA9A2DA412A642C2709BE760 116484~|~1~|~1~|~01/NFP~|~GR Project FY28.~|~21 - Safety~|~C3DB8C04F78EA0ACF48B2801C81C10E2A24CEEDA 90886~|~1~|~1~|~01/S<2~|~"01/S<2/OT/LANC" City of Lancaster project to add sidewalks curb ramps to various city street utilizing SRTS funding at 100% up to project cap.~|~~|~E44F8494654380818BAE11426791DC0D3F65F81E 125182~|~1~|~1~|~01/SAF~|~Guardrail replacement and adjustment~|~21 - Safety~|~CA516C21586505AE2185CF87B31193DACCEBBB40 104268~|~1~|~1~|~01/ENH~|~Constructing multiuse path in Harpersfield Township.~|~28 - Facilities for Pedestrians & Bicycles~|~2AEB2CAF7F68F875645E1F1304CBF2DFF25A848B 118357~|~1~|~1~|~01/SAF~|~Convert two-way stop-controlled intersection into single-lane roundabout at MED-162-25.11/State Rd~|~21 - Safety~|~5020270700D9E67660BA97C74584D956D4A5D611 101770~|~1~|~1~|~01/NHS~|~Replace deck edges and railing, perform hydro-demolition and place new rigid concrete overlay on twin three span concrete slab structures TUS-250-1713 L & R (SFNs 7905130 & 7905106).~|~13 - Bridge Rehabilitation~|~4871C806384E24C33B049E813354887F1DAB8DB9 116542~|~1~|~1~|~01/NHS~|~Replace bridge carrying SR 7 over Shannon's Run. In stream work is required. ~|~10 - Bridge Replacement~|~F83C2C794E4A9652CC10A810DA273E55D5D9F34F 99697~|~1~|~1~|~01/STR~|~Split for resurfacing work for the entire project funded at 80% federal and 20% state.~|~05 - 4R Maintenance - Resurfacing~|~D8055CA39CB07C7B72253E50A00820E69F54E128 104766~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order.~|~21 - Safety~|~6745C36B1872C9102A4726835D2323394A977F69 121824~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~752D9986B99C8DEF099D603AB3DB4788D0359FED 112469~|~1~|~1~|~01/NFP~|~Replacement of RPMs across D05.~|~21 - Safety~|~7EBB8AA34F31A328DF7FB7BE2F52D6D102D4ECC8 107147~|~1~|~1~|~01/NFA~|~Improvements to the Old State Road~|~01 - New Construction~|~2B2A6E25611DD3FBEB07318EBBFFFBF875C5D7D1 99636~|~1~|~1~|~01/SAF~|~Dam Removal - Safety Funds~|~44 - Other~|~C0870BE29B45AAE443E68D5DF7413B3166CB9B25 122356~|~1~|~1~|~01/IMS~|~Tree clearing for PID 117525.~|~16 - Right of Way~|~BB4B2048355C212A1AFA3572190FDFB898374C09 124752~|~1~|~1~|~01/STR~|~Bridge replacement.~|~10 - Bridge Replacement~|~34011232CE542DB547247630D14DDE81839BB01B 83346~|~1~|~1~|~01/ENH~|~Enhancement - Bike Path - 1 Split - 2 priorites~|~28 - Facilities for Pedestrians & Bicycles~|~7C4AF4505612672705287AA4C9B7C932EBE51A27 82211~|~1~|~1~|~01/S<2/HEAT~|~"01/S<2/PV/HEAT" - LCATS/Local Funding 4TA7/LC05 (80% Federal) / 4BG7 (20% Local) - CAP $306,744 LCATS for Construction - Resurfacing of existing roadway with widening to accommodate the addition of turn lanes. Joint project with City of Heath and Licking County~|~04 - Reconstruction - No Added Capacity~|~2017FA0C74754B3572EA8511D64128FDE792BC65 118872~|~1~|~2~|~02/S5K~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~B2F488CD363BC93FE1E5B069C9E2B1C37716E53E 118872~|~1~|~1~|~01/STR~|~plan split STP Rural~|~05 - 4R Maintenance - Resurfacing~|~1D8F027F12399E79B198E9612CC5E713DD17FBBC 118872~|~1~|~3~|~03/NHS~|~NHS plan split with interchange ramps~|~05 - 4R Maintenance - Resurfacing~|~68D5ACB52D5AEC27A34B418B699D6EF2EA30E8CB 94722~|~1~|~1~|~01/CMQ~|~Construct two bike reamps from West Fifth Street to the Great Miami Trail on West Fifth Street to the east and west Great Miami River Trails.~|~28 - Facilities for Pedestrians & Bicycles~|~9AE3D5429CBE008098D078A349AB31CDF9F97DC7 79741~|~1~|~1~|~01/NHS~|~Double Microsurfacing ? ASD-30-3.85 (SR 511) to 5.90 (structures west of SR 60)~|~05 - 4R Maintenance - Resurfacing~|~C0121B208EE75A27E9FCBC39A16E75BF659B43D1 105722~|~1~|~1~|~01/MPO~|~work eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~C394FD4F4D27F2A5C28ED89EE2A3305969A3E6A2 92128~|~1~|~1~|~01/STR~|~Resurface SEN SR635 0.11-6.08~|~05 - 4R Maintenance - Resurfacing~|~5329D8B8415A2758596D40C55BD067ACDC3F2EF6 92128~|~1~|~2~|~02/S<2~|~SLM 0.00 to 0.11~|~05 - 4R Maintenance - Resurfacing~|~1ED1071ABD0F05F86B27BFDBD579F56EB0A01A78 92128~|~1~|~3~|~03/STR~|~Rural Bridge split~|~05 - 4R Maintenance - Resurfacing~|~37189458A268EED99C50AB1C241B34EE5FD5AEDA 99819~|~1~|~1~|~01/MPO~|~Construction funding to cover full dpeth replacement of pavement, curb & gutter, driveway aprons, storm sewer, bus pads for Reed Road.~|~04 - Reconstruction - No Added Capacity~|~9143427CE38174998AA8829E9DE76AD3D2F3E543 97100~|~1~|~1~|~01/ENH~|~Rehabilitation of National Roadway Bikepath under US 40 with 80% TAP/20% City funding.~|~44 - Other~|~099B22AB84981E57014747386EA787005B706115 97100~|~1~|~2~|~02/ENH~|~Rehabilitation of National Roadway Bikepath under US 40 with 100% City funding.~|~17 - Construction Engineering~|~CAC00152B9C5053DFC7E35E544A33C8F530EAD0A 91554~|~1~|~3~|~03/NHS~|~NHS Bridge Overlay Non-eligible Over Paint Creek~|~13 - Bridge Rehabilitation~|~AD1CEB95710528FE9A192BCB0CA63F7A35C88190 91554~|~1~|~1~|~01/S<2~|~Urban paving in WCH on US-22 from SLM 7.25-10.33 (enter full WCH corp to leave corp on right)~|~05 - 4R Maintenance - Resurfacing~|~D75D483CCEF7AFD7778D48995C20DAEE0B809A26 91554~|~1~|~2~|~02/S<2~|~General system paving of US-22 from SLm 10.33-10.46 (leave corp on right to SR-753)~|~05 - 4R Maintenance - Resurfacing~|~DACAE5B59936953AA12DEEE849505EAD3FD7BE3C 110764~|~1~|~1~|~01/STR~|~Landslide repair. MRG 60 21.20-21.26.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8886A0ADB9A569EE12965EFA960637AAE39563C0 110764~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~516EB712AE49DD10E7C0502696B6E8FA2993DBD2 112636~|~1~|~1~|~01/S5K~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) WAY-57-4.819 to 5.003~|~05 - 4R Maintenance - Resurfacing~|~2E17B2EF0DE55C3DB79AAA1DE5CD32C00D0C34C7 112636~|~1~|~2~|~02/STR~|~Fine Graded Polymer Asphalt Concrete Overlay (smoothseal) WAY-57-5.003 to 8.914~|~05 - 4R Maintenance - Resurfacing~|~21B0122734249C194E84493D9851325C0ADAE93F 115266~|~1~|~1~|~01/NFA~|~Double chip sealing project on ATH CR 29 0.38-4.19.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9B790D79D0F4ECD4101BC890A24FD2A728BFF7D8 115266~|~1~|~2~|~02/S<2~|~Double chip sealing project on ATH CR 29 0.00-0.38.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~79BA49FC8156C43E818740A7FC3E6CDB2574D624 92385~|~1~|~1~|~01/NFA~|~Replace existing jack-arch bridge with a new 6X10 concrete box culvert on West Market Street. Work includes one new box culvert, concrete wing walls, railing replacement, asphalt replacement, sidewalk replacement, curb and gutter replacement, sanitary sewer replacement and water line lowering on West Market Street Section 0.07.~|~10 - Bridge Replacement~|~A40E1F0082777D971F4C9C74C84B91D5BA0C761D 105219~|~1~|~3~|~03/IMS~|~1. SFN 316047 - Repair deteriorated portions of the deck wearing surface and approach slab wearing surfaces per Proposal Note 512 Type B or Type C. Only patch areas that have unsound patches or are patched with asphalt. The patches shall encompass all unsound areas that are immediately contiguous to the deteriorated area. Unsound portions of the wearing surface that are not contiguous to the existing pothole or deteriorated patch shall not be patched. (Provide 100 SF for each bridge). 2. SFN 316055 - Seal the wearing surfaces of the deck and approach slabs with Gravity Fed Resin.~|~47 - Bridge Preventive Maintenance~|~1D76C5A8C16114E37892D7CEDD920F59CF6A54D2 105219~|~1~|~1~|~01/IMS~|~Resurfacing on the HAM-71 portion:HAM-71 SLM 0.56 to 1.17~|~05 - 4R Maintenance - Resurfacing~|~362489F1DC16D438D3811EA9CF2D819CA8A9967B 105219~|~1~|~2~|~02/NHS~|~plan split for the resurfacing on the HAM-50 section.HAM-50: SLM 21.37-21.43~|~05 - 4R Maintenance - Resurfacing~|~6D41DE5D7DC20A7D9A3DDE700AE85C1ADAAA2581 105219~|~1~|~4~|~04/IMS~|~: Replace damaged portions of damaged barrier on bridge, bridge abutment, and approach wall.~|~44 - Other~|~CD58FBB1596BC10E7AB7E3CE01D848C4A3F92DBB 105219~|~1~|~5~|~05/SAF~|~Reflective pavement markings.~|~21 - Safety~|~EACC8690BEBC9BBC7841171698528D64A190AEE3 124707~|~1~|~1~|~01/SAF~|~Upgrade existing traffic signals to improve traffic flow and safety utilizing Small City (4B97) Federal funds at 95% up to CAP and 5% Local funds (LNTP).~|~21 - Safety~|~AA1B5A9F6D1726A0B555A03E8AD72891D708B6AF 109969~|~1~|~3~|~03/S5K~|~Systematic upgrades of signs on the Small Urban sections~|~21 - Safety~|~8A2302C9998C3575680A6315D2E438B82A4979C2 109969~|~1~|~1~|~01/NHS~|~Systematic upgrades of signs on the NHS locations.~|~21 - Safety~|~97FFA51EA933E3AD88D96E33199604BAFD5F47B2 109969~|~1~|~2~|~02/S>2~|~Systematic upgrades of signs on the Large Urban locations.~|~21 - Safety~|~93430A31621C0071EC28EE6F1AFE2B3ABDE2E16B 109969~|~1~|~4~|~04/STR~|~Systematic upgrades of signs on the Rural locations.~|~21 - Safety~|~504958B1A7A196BB469775AAE601F7670B794082 122883~|~1~|~1~|~01/NHS~|~C.O. Major rehab funds, pavement and conduit work included.~|~04 - Reconstruction - No Added Capacity~|~A8C3169D341CC1A87BB809ADED92B42B73E63387 122883~|~1~|~2~|~02/NHS~|~C.O. Major Rehab funds, bridge work included.~|~13 - Bridge Rehabilitation~|~76B728EFA0162B39775A1FB7D6AE08B5B2511471 122883~|~1~|~3~|~03/SAF~|~Safety Funding. Construct an RCUT at Fry Rd.~|~04 - Reconstruction - No Added Capacity~|~585BEFEB739105DEE52F54B10A34F6234E59A2BD 109977~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 285 3.97.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DD9467A0BD1A26C71F80021F5A5F6A3EF7E04BE7 98513~|~1~|~1~|~01/SAF~|~Cpmstruct sidewalk and install signage along Carnation Drive from Stoneybrook Road to Laurel Drive to complete sidewalk network.~|~28 - Facilities for Pedestrians & Bicycles~|~2432405D59918F891B522BBCE4593F0C4ED2813D 114947~|~1~|~1~|~01/IMS~|~MSE Wall repair.~|~13 - Bridge Rehabilitation~|~A0C27CCD77D30DDF84706E31A1DD8A9071B7A716 111169~|~1~|~1~|~01/NFA~|~ODNR Dean SF.~|~04 - Reconstruction - No Added Capacity~|~7D9D98269868F1B5C832FA33E8BD05738C380BA9 79766~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B9F2B9EC823ACCBF9C8E212A6D3FAE0B1D8B7DD5 79766~|~1~|~2~|~02/BRO~|~Bridge workSFN: 7000243 RIC-13-5.30~|~47 - Bridge Preventive Maintenance~|~FD451D3E71F647183C35CC8654B557C6914C1C82 105037~|~1~|~1~|~01/NFA~|~The City will construct a non-exclusive use new asphalt apron 245' x 200' in front of the new airport hangar addition.~|~01 - New Construction~|~123B43AC7C3D42BF94623C99B377ECE9E1038E8D 81640~|~1~|~3~|~03/NHS~|~Work on NHS bridges, see linked bridges.~|~13 - Bridge Rehabilitation~|~B7E78043DB6FEE9DE267D01C5A9249B25949471B 81640~|~1~|~2~|~02/S>2~|~Fine graded polymer AC Overlay to STA SR 236 from 0.41 to 2.05, AC overlay with Repairs to STA SR 236 from 2.05 to 5.50.~|~05 - 4R Maintenance - Resurfacing~|~A58491BDF68C99B0030E839E8951A639728DD5DC 81640~|~1~|~4~|~04/S>2~|~See linked structure.~|~13 - Bridge Rehabilitation~|~E78ED8965966EDD2866F822C97F2BC27EFFE8115 81640~|~1~|~1~|~01/NHS~|~Fine graded polymer AC Overlay to STA SR 21 from 12.39 to 17.33. Minor bridge work to SFN# 7600542.~|~05 - 4R Maintenance - Resurfacing~|~2597F242284FACD9D59262FA883BDEC8C98375C3 88464~|~1~|~1~|~01/NHS~|~Polyester pavement marker program throughout District Seven 4CP7 maintenance funding does not require work locations.~|~21 - Safety~|~EB20B1A8BF1A32F4691254EF9FF59CF1FB0F91FA 100499~|~1~|~1~|~01/STR~|~PIK 220 0.00-4.07 & 9.77-10.96~|~05 - 4R Maintenance - Resurfacing~|~FE3264BE858FBE28FB54DFA82802AF11102E99B5 100499~|~1~|~2~|~02/S<2~|~PIK 220 9.55-9.77 & 10.96-13.42~|~05 - 4R Maintenance - Resurfacing~|~087167E9BFBF05DB59D0E8668D6A27CEDC9B3CFA 118289~|~1~|~1~|~01/SAF~|~Safety funded intersection improvement - roundabout~|~21 - Safety~|~2045C2BDF968DDD2F8E87842627A3F24DA22AA39 118289~|~1~|~2~|~02/S50~|~Culvert work not funded by safety (RIC-C0133-02265 on the south approach and RIC-C0133-02440 on the north approach)~|~13 - Bridge Rehabilitation~|~7BE80A7C4556C26B94894F13063C8568B6A52C43 118724~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~EE2E509ED003EC5F3A1A1C42AC918D87C4C23F15 111415~|~1~|~1~|~01/SAF~|~Safety funded Plan split~|~21 - Safety~|~8B959053745FEC7985E298CEE12DB982838D0CEF 120254~|~1~|~1~|~01/S>2~|~Construct sidewalk, ADA curb ramps, and pedestrian crossings on Hancock Ave (CR-20), Parrish Ave (MR-939), and Hensley Ave (MR-791) in the City of Hamilton to increase connectivity to Crawford Woods Elementary School.~|~28 - Facilities for Pedestrians & Bicycles~|~68569648AC14F051F5A555FC8C712009A5238B9A 80976~|~1~|~2~|~02/ERD~|~Mentor's 20% portion of their OH073 earmark. 100% federal pariticipation using TRC.~|~28 - Facilities for Pedestrians & Bicycles~|~60D10535FD809562760D394BD3C6819CFC2199EF 80976~|~1~|~1~|~01/ERD~|~Lake Metroparks' 14% portion of their OH073 earmark. 100% participation using TRC.~|~28 - Facilities for Pedestrians & Bicycles~|~FCAB01688889FB6293A21A27D90DD75FD11B4243 115350~|~1~|~1~|~01/MPO/BARB~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~97FA6D5263F1823A7C0F79C8DBB87BCBC0531A87 110795~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using asphalt overlay treatment. HOC 56 0.00-4.41, HOC 180 0.00-0.39. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~9E234F6B45B2A9B2131EFC00FFFD32494F374758 110795~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using asphalt overlay treatment. HOC 678 0.00-4.00. Not on the federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~02DE3E00BA245F6BDCFA41AFA8C5C96FEF458B93 110795~|~1~|~3~|~03/NFP~|~Paving the Laurelville Outpost paving lot. Funded 100% State LBM7.~|~05 - 4R Maintenance - Resurfacing~|~E223481DEC70FB44375039EABAF2A057C155BF82 105936~|~1~|~1~|~01/MPO~|~rehab/widening work eligible for federal aid~|~05 - 4R Maintenance - Resurfacing~|~448D45BF0DABEE1C9DC3E8A7336822E14A72E96D 105936~|~1~|~2~|~02/NFA~|~rehab-widening work eligible for federal aid~|~05 - 4R Maintenance - Resurfacing~|~1D8CEF58EF025F0261D0AE0E678F241B0809740D 102954~|~1~|~1~|~01/STR~|~HUR-103-6.62-7.39HUR-598-0.00-2.07RIC-598-0.00-3.86RIC-13-21.69-32.63~|~05 - 4R Maintenance - Resurfacing~|~42A47CF6C1E8BA9E92786ABAA4030D5325D0AAFF 102954~|~1~|~2~|~02/S<2~|~HUR-103-5.52-6.62HUR-598-2.07-2.64RIC-39-17.34-18.65~|~05 - 4R Maintenance - Resurfacing~|~384ACE6DD89DC3686C99D004FA50C5A4C91EB415 102954~|~1~|~3~|~03/STR~|~RIC-13-22.25RIC-13-23.60RIC-13-25.11RIC-13-27.33RIC-598-3.33~|~13 - Bridge Rehabilitation~|~343FC224088C4E77B0CFA4FAA729BE8B58E4AD8A 114995~|~1~|~1~|~01/STR~|~All work in this plan split using district allocations. 80% Federal SAC 4PF7 and 20% state SAC 4PS7.~|~21 - Safety~|~95D0CFB0C75DB8FA44D750A7F00676F6499397AE 92735~|~1~|~1~|~01/ERD~|~MRG-TR21-3.66. Rehabilitation of Barkhurst Mill covered bridge. SFN 5834287. Federal/Local 80/20%.~|~13 - Bridge Rehabilitation~|~FF99E7BAEE771FAF8A2B50DF5240A862DD0181DD 101507~|~1~|~1~|~01/NHS~|~LOR-20 NHS Route Pavement Repairs - Reactive Maintenance~|~05 - 4R Maintenance - Resurfacing~|~1378B84EC15318CD00C20688BB9BF3AEB3C22000 101507~|~1~|~2~|~02/IMS~|~MED-271 Interstate, Pavement Repairs - Reactive Maintenance~|~05 - 4R Maintenance - Resurfacing~|~6EF42B760DE11357E6AEBD4CA6F28D37207DD606 94130~|~1~|~2~|~02/IMS~|~Bridge maintenance on SFN 5004853 MAH US 224 19.65 over I-680~|~~|~2FF786F05E664149B2F5EDBB14F286B62D675C11 94130~|~1~|~4~|~04/NHS~|~Replacing the linked structure.~|~~|~D14B4E951FCAF6AAACFE06E037243F94EB217F70 94130~|~1~|~1~|~01/NHS~|~Resurfacing MAH US 224 from 19.46 to 25.33~|~~|~448DF123FA2EC49B34CE9A6901EA421EEEFE8FB1 94130~|~1~|~3~|~03/NHS~|~Bridge maintenance on SFN 5004861 MAH US 224 18.53 over Branch of Yellow Creek, SFN 5004896 MAH US 224 20.51 over Branch of Yellow Creek.~|~~|~4948C9AA71DA441F09C59B6D091751ED75762CFF 104924~|~1~|~1~|~01/NFA~|~Bridge Brothers truck replacement project~|~44 - Other~|~4751099C9D0FF565093947700478921ED0467261 113363~|~1~|~1~|~01/SAE~|~Connect an existing bike path located along Verity Parkway beginning at the intersection of Verity Parkway and Layfayette Avenue and terminating at the intersection of Verity Parkway and Girard Avenue to the Great Miami River Recreational Trail through City of Middletown lands and public streets.~|~28 - Facilities for Pedestrians & Bicycles~|~E6CD78BC56B1455DF4C26A9878719991B52A5D24 100867~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2021 herbicidal spraying. Funded 100% state.~|~17 - Construction Engineering~|~5538AAF2217648CC7A88CD15D7FB697D358AD3CA 115496~|~1~|~1~|~01/S<2~|~SRTS project along Yoctangee Parkway in the City of Chillicothe. Project includes constructing sidewalk and enhancing 8 intersections. ~|~21 - Safety~|~55F7E8D6388609FF066C25A69ED391B2C67EAE09 98212~|~1~|~1~|~01/IMS~|~District Culvert Funding 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Lining culverts located along IR 70 and IR 77 as linked above~|~04 - Reconstruction - No Added Capacity~|~67FE69995C28A6F2C59713AA0AE18F61EC67BE2B 96407~|~1~|~1~|~01/SAF/JOHN~|~Safety Funded 4HJ7 (90% Federal) / 4BG7 (10% Local) - CAP (See Comments) - Construction of Turn lanes on US 62 in Village of Johnstown from 4.17 to 4.63~|~21 - Safety~|~C02E8B9D66830432D4DA0EC885BD2D0AD56BD195 94299~|~1~|~1~|~01/NFP~|~LUC-75-4.53 joint repair.~|~05 - 4R Maintenance - Resurfacing~|~6B7E8E575A28FB559F5CEDE854E767950503CDD1 102940~|~1~|~1~|~01/NHS~|~NHS eligible.~|~10 - Bridge Replacement~|~CA70E3E45225423D06106B5137671D18BC20795A 101411~|~1~|~3~|~03/S<2/GENE~|~Resurfacing of ATB SR 534 from 21.21 to 21.85 urban paving in the City of Geneva.~|~05 - 4R Maintenance - Resurfacing~|~95F813F3188DA32F0122D28D971962DB596E9820 101411~|~1~|~1~|~01/STR~|~Resurfacing ATB SR 534 from 17.04 to 18.61.~|~05 - 4R Maintenance - Resurfacing~|~9BDBD845B5C36AB695ED16327AD0FB19126CB6A2 101411~|~1~|~2~|~02/S<2~|~Resurfacing ATB SR 534 from 18.61 to 19.34.~|~05 - 4R Maintenance - Resurfacing~|~17E3EC7AA3A7381856B5737E0049454753268A1B 101411~|~1~|~4~|~04/S<2/GENE~|~100% City items such as full and partial depth repairs, catch basins, manholes and ADA curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~61AED3864B370A10DAFE0FB92FC5FC8312CBDE36 108655~|~1~|~1~|~01/NFP~|~Plan split for new noise wall construction along I-271 and repairs at 2 locations~|~44 - Other~|~B9260B72E660F98ADD7780945BC90E533D74E125 94382~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: CRA-4-0.00-6.37~|~05 - 4R Maintenance - Resurfacing~|~F219E1AD02BC1B479AEA4FB509AF68CAC48FA2CF 94382~|~1~|~2~|~02/S<2~|~STP < 200000 Resurfacing: CRA-4-6.37-6.72~|~05 - 4R Maintenance - Resurfacing~|~2B7CF0072E357863D377BD7969ED8302557A328A 94382~|~1~|~3~|~03/STR~|~Bridge work on CRA-SR-004-00.43~|~13 - Bridge Rehabilitation~|~4EF321F7AAC3AA555C2FD66BD497330DA7F709AC 102639~|~1~|~1~|~01/NFP~|~Salt building~|~44 - Other~|~E557C4464A8A537B47C0CD4FEAB8DCE2DC754F0A 109613~|~1~|~1~|~01/S>2~|~Access management on Mason Montgomery Road between Escort Drive and Merten Drive.~|~21 - Safety~|~D84D1459589B4FBFBA8432D39F456CF461E0F835 115141~|~1~|~1~|~01/STR~|~Repair or Replace Culvert~|~~|~60C96E0A871A40FB7DDF091C12B1A88A0D31BE89 90655~|~1~|~1~|~01/STR~|~culvert at SAN SR590 4.99-5~|~04 - Reconstruction - No Added Capacity~|~D7108A43604C7C9C8BF40A4C39A74685C6BC5461 97643~|~1~|~1~|~01/BRF~|~SFN 3560333~|~10 - Bridge Replacement~|~D2837242A3A1343B031568190AE33983B5322F63 97643~|~1~|~2~|~02/BRF~|~SFN 8730008~|~10 - Bridge Replacement~|~322C6ABEA83B7B6FF2B23A36C8503E87E0AFABEF 97643~|~1~|~3~|~03/BRF~|~SFN 8742596~|~10 - Bridge Replacement~|~BBC692B39BEC6B7B810A3580F1AFE03D3D318598 97643~|~1~|~4~|~04/BRF~|~SFN 8742650~|~10 - Bridge Replacement~|~D6ED64C6E9CFCBF5180C044887B56468B7EF983C 114765~|~1~|~1~|~01/NHS~|~BRO Double micro~|~05 - 4R Maintenance - Resurfacing~|~FD919CDF9B88782D1B46232AF4F25EEBD9BBFA51 82261~|~1~|~1~|~01/NHS~|~Sign Replacement~|~21 - Safety~|~A006FC5525B3E8D36F49E3203AD128626315E2A6 101100~|~1~|~1~|~01/STR~|~Overlay with repairs on rural route: CLA SR 54 SLM 10.00 to 11.75Overlay without repairs on rural route:CLA SR 54 SLM 6.01 to 10.00~|~05 - 4R Maintenance - Resurfacing~|~FFA3F96EDB863A2AC1D2EA874655C99358D5BEDB 107540~|~1~|~1~|~01/STR~|~Chip seal work on SR 342 and SR 800~|~05 - 4R Maintenance - Resurfacing~|~9129B8F7EE6DA064347EF2653D65F74BA3618918 94721~|~1~|~1~|~01/S>2~|~Plan split for all work for the project using federal STP funds at 80/20.~|~05 - 4R Maintenance - Resurfacing~|~0D99841E50CC092CCE7360FBEEE5A24C4037C136 94721~|~1~|~2~|~02/S>2~|~Split for 100% local items of work~|~05 - 4R Maintenance - Resurfacing~|~99D6C5D76E8BAC298909A0157663D30C84D921EB 110311~|~1~|~1~|~01/NFP~|~AC Overlay with Repair ASD-250-0.00-8.46~|~05 - 4R Maintenance - Resurfacing~|~FC05733C57A5F96997ADFA8A007B80C82C5FF905 110311~|~1~|~2~|~02/NFP~|~Bridge work:(SFN 0304549)ASD-US-250-00.090 Preventive Maintenance: Drainage system cleaned/repaired (028) Bridge railing upgrade/repair (061) Reactive Maintenance: Deck patching(conc) (049) Exp jt repair/repl (048) (SFN 0304573) ASD-US-250-01.030Preventive Maintenance: Expansion joint repair/replacement (048) Bridge railing upgrade/repair (061) Reactive Maintenance: Exp jt repair/repl (048) (SFN 0304654) ASD-US-250-03.520 (NO WORK)(SFN 0304697) ASD-US-250-03.750 (NO WORK)(SFN 0304735) ASD-US-250-07.410Preventive Maintenance: Bridge railing upgrade/repair (061) Reactive Maintenance:Exp jt repair/repl (048) (SFN 0304751) ASD-US-250-07.550Preventive Maintenance: Bridge railing upgrade/repair (061) Reactive Maintenance: Exp jt repair/repl (048) ~|~17 - Construction Engineering~|~E27D5785C56C87D15103A07DE469FA8EE55AE429 92819~|~1~|~1~|~01/NHS~|~Removal and replacement of the existing bridges, approach slabs, and minimal roadway work. SFN 5704596 MOT SR 49 10.73 R SFN 5704561 MOT SR 49 10.73 L~|~10 - Bridge Replacement~|~32B619281E06A40EBC3B52569C30786530020C44 110929~|~1~|~1~|~01/NFP~|~All work in this project.~|~04 - Reconstruction - No Added Capacity~|~8D4063F2C407911E55BAE999A58295AA582E3A91 102861~|~1~|~1~|~01/NHS~|~Plan Split for NHS routes~|~05 - 4R Maintenance - Resurfacing~|~C5702CE5B3225C2311C9578F28B103A03DD73C6C 102861~|~1~|~2~|~02/S>2~|~Plan Split for STP>200000, FRA-40, DEL-315.~|~05 - 4R Maintenance - Resurfacing~|~97FD4341DED2843C1B63B466073C80BA745677EE 102861~|~1~|~3~|~03/STR~|~Plan Split for STP Rural routes, DEL-37~|~05 - 4R Maintenance - Resurfacing~|~1C74A4D6B9119F9F9D0403AFC2F55BA61CD0D337 126147~|~1~|~1~|~01/CMQ~|~Construction of sidewalk and shared use path as well as all associated items at intersections where needed, utilizing MPO CMAQ funding at 80% with 20% Local funds. ~|~28 - Facilities for Pedestrians & Bicycles~|~14BF172DE228F4A9CC2745B1A8C56E8799E20C56 108947~|~1~|~1~|~01/NFP~|~All the work in this bridge replacement project is in this plan split. Federal/State Exchange Program. 95% state funds SAC 4C87 and 5% local SAC LNTP. After the cap is reached any additional funds needed with be provided by Wyandot County.~|~10 - Bridge Replacement~|~FDFEBCD6502763D680038B394E26A5FFE8BA43F3 110096~|~1~|~1~|~01/S>2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): Resurfacing-Urban Paving City of Avon LOR 0254 6.39 to 7.83 (East of Nagel Rd.)~|~05 - 4R Maintenance - Resurfacing~|~06B4D12C976726F752CF412307AEEC95C6553462 110096~|~1~|~2~|~02/S>2~|~100% Local (Avon): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, Curb Ramps etc.): LOR 0254 6.39 to 7.83 (East of Nagel Rd.)~|~05 - 4R Maintenance - Resurfacing~|~DF50F0592436E50DF660C685728736E16466B904 101563~|~1~|~1~|~01/NFA~|~City of Wellston Bikepath.~|~44 - Other~|~BDA11C677887CB23EFA9C8B0F7DF997E05A5BCB4 116351~|~1~|~1~|~01/STR~|~Resurfacing SLM 13.24 to 16.54~|~05 - 4R Maintenance - Resurfacing~|~A44DC37E5466A4FA7824413CC66F520F35C2D769 116351~|~1~|~2~|~02/NHS~|~Resurfacing SLM 16.54 to SR 151~|~~|~15B717677D2BC5077DEA59A5386A760D25004844 120113~|~1~|~1~|~01/SAF~|~Work that is federal aid eligible to enhance safety and installing sidewalks~|~28 - Facilities for Pedestrians & Bicycles~|~701DFA6C3189C55F56CA6891624405BD91F71036 110616~|~1~|~1~|~01/NHS~|~Resurfacing of TRU SR 11 from 3.13 to 7.68 and 9.97 to 12.62.~|~~|~77825D229EC5AE7824D1FA67508FFAFA8D3AAFBB 110616~|~1~|~2~|~02/NHS~|~Minor bridge rehab > 20' span.~|~~|~1AF158D4592AEE3FFDDF7D71AA8846B04D8DD215 110616~|~1~|~3~|~03/NHS~|~Minor bridge rehab > 10' to 20' span.~|~~|~5AF06F4E92263CED568699CE60BF971980E27BB2 98182~|~1~|~1~|~01/NFA~|~Lyons Road full service facility~|~44 - Other~|~1D6AB8AF4D0250F1F16A74188713D2ABCB1E62AD 117331~|~1~|~1~|~01/NFA/MCEO~|~Bridge replacement of MUS-TR00090-2.44 (SFN 6038395) carrying Wortman Road over Thompson Run.~|~10 - Bridge Replacement~|~59BD2EBC221808B5FCF50588332397BDF34769B9 99623~|~1~|~1~|~01/IMS~|~SFN 5704804, MOT-70-0334 Arlington Pike (C9) - Remove and replace the deficient bridge deck. Investigate semi-integral abutment conversion. Use SCC mix to patch concrete abutments, piers, and wingwalls. Seal concrete surfaces. Paint structural steel.~|~13 - Bridge Rehabilitation~|~FACFA7C25DD35F48AA1D96DC90829A4C5ED2C921 99623~|~1~|~2~|~02/IMS~|~The City of Brookville is paying 100% for the pylons.~|~13 - Bridge Rehabilitation~|~BE135D3836675306931752E4FCD0BFD271C4A0E5 99623~|~1~|~3~|~03/IMS~|~Decorative lighting to provide pedestrian safety~|~13 - Bridge Rehabilitation~|~E692F91BC762C2980F52FF9B115309D149AE2305 90644~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7.~|~99 - State Preventative Maintenance~|~94E85A76283B3F266D36FD17C4C74D4B0002B808 122453~|~1~|~1~|~01/BRO~|~Bridge replacement~|~13 - Bridge Rehabilitation~|~7D4C8BE740C95845A5C5C194F1353BF2C3070FC7 121034~|~1~|~1~|~01/S>2/HUDS~|~Railroad grade separation.~|~08 - Bridge - New Construction~|~ED28CB632793EC97AD36C5CC1A920084D108A00A 108639~|~1~|~1~|~01/NHS~|~Pedestrian improvements on Main Street and Broadway Street in downtown Lebanon. Improvements include intersection lighting, leading pedestrian intervals, high-visibility crosswalks and curb extensions.~|~28 - Facilities for Pedestrians & Bicycles~|~9F2D7C48424AE3BE1AEC891DE89A20FD6FF95721 115533~|~1~|~1~|~01/NHS~|~Landslide repair project. GAL 7 19.97. Funded 80 Federal/20 State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C2BBCA902BD330C522DA6ABEF9A05F0C33D2DC0A 115533~|~1~|~2~|~02/NHS~|~Work also includes a culvert replacement on GAL 7 20.03, CFN 1981270.~|~04 - Reconstruction - No Added Capacity~|~5780EE5DC6665B97C1B0EC3D995384232931106A 115533~|~1~|~3~|~03/NHS~|~Plan split to add a part code for the purchase of a casing. ~|~04 - Reconstruction - No Added Capacity~|~92B83173E23CB54A09A524C3962CD14F2E2802FF 93794~|~1~|~1~|~01/SAF~|~Safety Project on SR140 in Scioto County.On SR140, 0.65 mile north of Staten Road to 0.37 mile south of Gephart Road (7.28 to 7.80), it is proposed to perform a safety project by widening the shoulder through two curves. CC is 100% Fed Safety FundsPE is 90% Fed/10% State Safety FundsRW is 90% Fed/10% State Safety Funds01/SAF/PV/State~|~21 - Safety~|~1527FBE83718AE25ACBECC85A3084673E55F7F1E 92860~|~1~|~1~|~01/SAE~|~Guardrail upgrade/replacement~|~21 - Safety~|~D629435C7249F648C901E398FC5499D16FC4118F 123519~|~1~|~1~|~01/STR~|~Landslide repair.~|~~|~5550598C54928F8D54FC170DAE85DE99CECCE698 25352~|~1~|~1~|~01/S>2~|~REHABILITATE BRIDGE NOS. CLE-126-0211 AND HAM-126-2186, SFNS: 1306146 AND 3105261.~|~13 - Bridge Rehabilitation~|~587986D1288C3FFB3023EFB7861A55E0B67EA559 86746~|~1~|~1~|~01/IMS~|~80/20 fed/state funding split for capacity additions~|~03 - Reconstruction - Added Capacity~|~037CDD338C640240ED881DC77D4761DD8EF3C418 86746~|~1~|~2~|~02/IMS~|~90/10 fed/state funding split for exisitng pavement replacement~|~03 - Reconstruction - Added Capacity~|~649B07AF29C528D82C42E95F99CD556EFBE46026 96559~|~1~|~1~|~01/NHS/TALL~|~Resurfacing SUM SR 261 from 17.09 to 18.41, Urban Paving 80/20 items in the City of Tallmadge.~|~05 - 4R Maintenance - Resurfacing~|~EAC0AD080D1FFEAD128E640331477763703DF8CA 96559~|~1~|~2~|~02/NHS~|~100% City of Tallmadge items.~|~05 - 4R Maintenance - Resurfacing~|~213CBF9101178E558D222D0B0B93834E42CBC3CF 77265~|~1~|~1~|~01/IMS~|~Widen IR 76 from State Street to the IR 77 Interchange and redesign Kenmore and Battles interchanges, in the City of Akron, Summit County, Ohio. ~|~~|~3BEA78D5C27F0FF3DE2A8EE10AD6ED804333358C 88877~|~1~|~1~|~01/STR~|~Resurfacing ATB US 6 from 22.36 to 22.56 and 29.94 to 32.60, ATB US 6D from 0.00 to 0.06, ATB SR 7 from 14.95 to 18.42 and ATB SR 167 from 7.69 to 10.46 and 11.37 to 14.08.~|~05 - 4R Maintenance - Resurfacing~|~5433B22B4C69D0C494346AB15378BE73E0F5E218 88877~|~1~|~2~|~02/STR~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~2F00B2CEB028862FDD09BAE7D3A0C48782C88B28 88877~|~1~|~3~|~03/STR~|~See linked structures 10' to 20' span.~|~13 - Bridge Rehabilitation~|~27910DD417D3AA48AEB4CAC10542E4981B111FEC 108743~|~1~|~1~|~01/S>2~|~Rehab and improve drainage~|~05 - 4R Maintenance - Resurfacing~|~BFE24AF4F14C202BF682B7DF5A411C98D3BF8661 122072~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~C9173BE1AB77F9206A1D5D3153F01C9809CBB7C1 93901~|~1~|~3~|~03/NFA~|~Field pave the invert~|~47 - Bridge Preventive Maintenance~|~0F321DBDD048E9058430B9BF583C359FCABF02D5 93901~|~1~|~1~|~01/STR~|~Field paving the invert of various culverts all bridges under 20 feet. SFN 5403634 Mer 274 0318 SFN 5504384 MIA 571 1905 SFN 5504414 MIA 571 2021 SFN 5504503 MIA 589 0092 SFN 7500483 SHE 47 0681 SFN 7502826 SHE 119 0611~|~13 - Bridge Rehabilitation~|~2722FBCD950F97F2E92790AC4C2FD7B1A0014D28 93901~|~2~|~2~|~02/STR~|~Field pave the invert of SFN 5400813 (21')~|~47 - Bridge Preventive Maintenance~|~C7E004D1851F28209AA28843695252AE6350D502 105424~|~1~|~1~|~01/IMS~|~Diamond grinding on Interstate Route: MOT IR 70 SLM 17.40 to 23.55 & CLA IR 70 SLM 0.00 to 0.51.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4E18B5F99639F1A2B410583B6D31B0EB97E82AFC 115808~|~1~|~1~|~01/IMS~|~Remove & replace mainline superstructure.~|~13 - Bridge Rehabilitation~|~D6BF9018ECEB912871C2F1ABD6DC65399ABFD6E6 97439~|~1~|~1~|~01/SAF~|~Realignment of CR 51 (Baumhart Road) at CR 32 (Middle Ridge Road).~|~21 - Safety~|~0C22DB403FDC2C9C2DD9EDFB8580F518A308005F 97439~|~1~|~2~|~02/SAF~|~100% Local items.~|~17 - Construction Engineering~|~3088F97B7CD6AEFCBD2B7BBC103B8E049EC93295 115846~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2028.~|~21 - Safety~|~44920B905683DDCD0FFC75374B4F31A43DBD472E 91710~|~1~|~1~|~01/BRO~|~Replacement of SFN#7700369 Major Bridge structure with two new structures (SFN#7700370 and #7700371) over the Cuyahoga river valley and located between Glenwood Avenue and Perkins Avenue, in the City of Akron, Summit County, Ohio.~|~10 - Bridge Replacement~|~DA0BCD27C93F362FD21607C4360D7FD381A62B2B 91710~|~1~|~2~|~02/NHS~|~Construction of overlook and gateway aesthetic treatments on the South end of the structure near the Freedom Trail.~|~31 - Landscaping & Other Scenic Beautification~|~B2BB93302FA9B5A09714FB8A6D3AAFBA8C01753C 91710~|~1~|~6~|~06/NHS~|~Culvert replacements and repairs on SR 8.~|~04 - Reconstruction - No Added Capacity~|~673116E05B73676F7DFAED6BE38B6607B098F208 91710~|~1~|~7~|~07/S>2~|~Culvert replacements and repairs on SR 59.~|~04 - Reconstruction - No Added Capacity~|~FA9B6E3F071A4B57F80DC4304A26B7790E6050E8 91710~|~1~|~4~|~04/NHS~|~Reconstruction of SR 8 pavement.~|~04 - Reconstruction - No Added Capacity~|~591E4A74BA525E2F7284D991964B7DF61F7B68C6 91710~|~1~|~5~|~05/S>2~|~Reconstruction of SR 59 (Perkins NB ramp).~|~04 - Reconstruction - No Added Capacity~|~CC049688933A8518EC867DF34903CB34AAB6C202 91710~|~1~|~3~|~03/NHS~|~Construction of four noise walls along SR 8 within the project limits.~|~20 - Environmental Only~|~6FE39179BE060A659198DEA016A8AFE1A3652DCF 91710~|~1~|~8~|~08/NFA~|~Bridge hit change order~|~04 - Reconstruction - No Added Capacity~|~49717EE9786F8625433D875412A6B4155457A6B6 95410~|~1~|~1~|~01/IMS~|~Replace bridge deck, convert to semi-integral abutments and patch substructure. SFN 5705193 under T32 (Kimmel Road).~|~13 - Bridge Rehabilitation~|~441FB5DB65112128DCAC5F2B2BC88A01A16A624E 97471~|~1~|~1~|~01/NFP~|~Added Plan Split for funding~|~04 - Reconstruction - No Added Capacity~|~3518F3C0793DE4D304AB34A2D02EAA682E887322 107721~|~1~|~1~|~01/STR~|~Slide RepairADA 781 6.60 & 7.40~|~04 - Reconstruction - No Added Capacity~|~4549E7DC09F0C6E29BF7068BFE7B534F1C3FF8DD 95565~|~1~|~1~|~01/S<2~|~Urban system paving in the City of Dover on SR 211 from SLM 1.01 to 1.23 and on SR 800 from SLM 21.94 to 22.74; eligible items include asphalt pavement, long line pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~D01E022B885C969C3EF25CD27E78B29BAC14F05F 95565~|~1~|~2~|~02/S<2~|~Urban system paving in the City of Dover on SR 211 and SR 800; includes curb ramps (to be done in separate project by City before this project is constructed) and aux. pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~D360CE998805AFE06E71387B46CD235194FFF561 95565~|~1~|~3~|~03/NHS~|~Urban system paving in the City of Dover on NHS eligible routes including SR 211 from SLM 0.06 to 0.21 and SR 800 from SLM 20.50 to 21.94; eligible items include asphalt pavement, long line pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~F12F193AF3F3E385CDD667BD7F07FE4630C74AC1 107640~|~1~|~1~|~01/STR~|~Replace bridge SCI 348 6.56 (7305494)~|~10 - Bridge Replacement~|~70FE9FF1831B1F19F3B68F7A577AB85F9063533F 91784~|~1~|~1~|~01/BRF~|~South D Street: from 50' south of Bridge BUT-South D St-0048 to 50' north of the bridge. SFN 0960241 Project will preserve Bridge BUT-South D St-0048, which carries South D Street over the CSX railroad. Improvements include rehabilitation of the stone abutments and wingwalls by stabilizing through encapsulation or shotcrete, drainage improvements at the foundation, replacement of beam waterproofing, and replacing the existing wearing surface.~|~13 - Bridge Rehabilitation~|~DFE7225BE2FCF7F71DF0170C2A7C6E9EAABAC9BD 97365~|~1~|~1~|~01/BRF~|~Bridge deck replacement project to inlcude railing, spot painting and concreate patching of abutments and piers.~|~13 - Bridge Rehabilitation~|~E207A81DE0A7529F80DC0478FE097A4F096F0787 106217~|~1~|~1~|~01/NHS~|~Milling and resurfacing along with repairs on Indian Ripple Road in the City of Beavercreek.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6A8BF9382463C4E3E81E6C84378467888CB29DDC 110288~|~1~|~1~|~01/STR~|~Plans split for GSM funds~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~88FF6BC80F5BD2464F68448B3F79A7883023E0FA 104747~|~1~|~1~|~01/SAF~|~plan split~|~21 - Safety~|~34D81CF4538A75EB93B13C06F7F91C69C90DA855 91809~|~1~|~1~|~01/STR~|~STP Rural funding for culvert work at:PIC-22-23.40~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~89BEEADCD19D9B93EE235832A9B94E66528E1737 91809~|~1~|~2~|~02/NFA~|~FAY-753-3.20,FAY-753-3.90FAY-753-4.00~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FFF20288A12BFCFE3685B7F8B5BF8B9AAA32FB11 106687~|~1~|~1~|~01/NHS~|~Street and sidewalk reconstruction on Stimson Avenue. Begin at Grant Street and end at East State Street. Funded through the Small Cities Program. Total length of work .43 miles. 95 federal/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~94BF143E391BE587CC8C3BE7339D1171096F4F91 97659~|~1~|~1~|~01/S<2~|~Resurfacing COL-517 in Lisbon from SR 164 to SLM 2.20, including asphalt overlay and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~CAFBF3992C0ABCA5E46762C47B1E26B9D7051CE2 97659~|~1~|~2~|~02/STR~|~Resurfacing COL-517 from SLM 2.20 to SR 7, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~41321140B0DFC4D6CB0FB1D1224EE1F81F27E2C2 118707~|~1~|~1~|~01/STR~|~MRG SR 78-8.27 300 ft a landslide repair with drilled shafts.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~64B4EEF639709377A6C09041D814129B5EC1390D 108052~|~1~|~1~|~01/IMS~|~Construction inspection task order.~|~17 - Construction Engineering~|~9AFE5639B1807F98B16BCBA74683FE2EACD2B512 113883~|~1~|~1~|~01/NHS~|~Repair collapsed section of culvert under US35 via Emergency A contract~|~04 - Reconstruction - No Added Capacity~|~BF3A5BE6A0C3A6AFBE30494BF7E9382DBBCB336E 96717~|~1~|~1~|~01/NFP~|~ODNR funded project. Asphalt repair/resurfacing at VIN Rupert Lake Wildlife Area. Non federal aid project funded 100% state.~|~~|~EBA5C84D306E679A70116FE6A5B7C0E39D3B0A18 105487~|~1~|~1~|~01/SAF~|~District wide polyester pavement markers.~|~21 - Safety~|~E1549486EEED6022C00F85AC58534928FDD8A667 100369~|~1~|~2~|~02/S<2~|~WOO-SR105 from SLM 0.94 to SLM 1.18.~|~05 - 4R Maintenance - Resurfacing~|~8A3EC679CD5C599A9D8A29203A55928EF92ED07E 100369~|~1~|~1~|~01/STR~|~SEN-162-0.58 to 9.51 & WOO-105 from 1.18 to 5.83~|~05 - 4R Maintenance - Resurfacing~|~959FF2DCFFBE20090467D5DE0C18DD4B1567F7DD 124691~|~1~|~1~|~01/MPO~|~Plan split for superstructure replacement of a federally eligible bridge~|~10 - Bridge Replacement~|~4ABAC6E1623BCBE7B3B1FEFCF6FF598F92A42344 100501~|~1~|~1~|~01/S<2~|~ROS 50 (19.31-21.78)~|~~|~242E815A93951313E09DE803F79C585F346A3969 116668~|~1~|~1~|~01/NHS~|~Added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~04CDF180B7EB64256F5635512615F151565A039D 93255~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on ; Not BR Eligible for Rehabilitation: Length=12 SD/FO(1) SR=64.2 DSR=" "~|~13 - Bridge Rehabilitation~|~EED403D48914784615FBBF3340C7F09814A0CBD8 98703~|~1~|~1~|~01/MPO~|~Resurfacing of Olde Eight Rd from SR 303 to Boston Mills Road~|~05 - 4R Maintenance - Resurfacing~|~6EBCA5D5F0C04A4D79F8B562E6C44A83E7493E44 106789~|~1~|~1~|~01/STR~|~SR 149 and the IR 70 eastbound on/off ramp intersection improvement.~|~21 - Safety~|~11989B95C79650452F95A0C23ED106D6B987ECE0 94469~|~1~|~1~|~01/CMQ/BLUF~|~ALL-Augsburger Rd. Bikepath, 80% Federal MPO-CMAQ funds (4TB7) and 20% Local (4BG7) from the Village of Bluffton. The CMAQ eligibility was approved in an April 14, 2014 letter.~|~28 - Facilities for Pedestrians & Bicycles~|~84903373FE4D31588CD377356E72567629FB8048 109718~|~1~|~2~|~02/S<2~|~Microsurface on:MER-29 SLM 13.22 to 15.79~|~05 - 4R Maintenance - Resurfacing~|~F848C5A9004836AC9B48EAA07A798AE3E27B4D13 109718~|~1~|~1~|~01/STR~|~Microsurface~|~05 - 4R Maintenance - Resurfacing~|~7B88FF6B7EB1F5499C9C08D5A45FF00B8A038489 109718~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~78FAB003A9DA021F27DF6DA3A71537E99AD43EAD 107120~|~1~|~1~|~01/NHS~|~Urban Paving - City of Fairborn - Lindberg to E. Dayton Drive.~|~05 - 4R Maintenance - Resurfacing~|~808517F1908EB3610AEDD4663939B392CDB52E84 107120~|~1~|~2~|~02/NHS~|~Items to be covered 100% by the City of Fairborn~|~05 - 4R Maintenance - Resurfacing~|~4E0463845B13C12ADCA570A6E7A2C9B70E2E91B8 92324~|~1~|~1~|~01/NFA~|~Bridge replacement project. ATH 356 1.39, SFN 0503932. Not on any federal aid system funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~909ECA5EF289FA3DEE0A205EBB171F9C21166F00 105951~|~1~|~1~|~01/S>2~|~Resurfacing and rehab within the City of Centerville.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8D3022022349FAA03E82EFFB09E76D165128B416 102196~|~1~|~1~|~01/STR~|~ADA CR 100 1.61 ER Slide repair.~|~~|~EA2189361E7A138DD308603C5F974FECCE73D06B 115563~|~1~|~1~|~01/NFP~|~Resurfacing of Big Bend Trailhead driveway and parking lot in the Summit MetroParks district.~|~05 - 4R Maintenance - Resurfacing~|~0F3ED4AFC9DE4DE7AAB332B9EBFFD13814311E3E 115519~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~407EE04C8DA59BDAAD633D63B057C0B145836FD9 101976~|~1~|~2~|~02/S<2~|~For work on CR 418 from the Van Wert Urban Area boundary at CR 77 (Liberty Union Road) SLM 7.07 to the end of the project at TR 83 (John Brown Road) SLM 8.14. 80% Federal urban STP funds from the CEAO, SAC 4B77, with a 20% local match provided by Van Wert County, SAC 4BG7. Funds needed over the CEAO cap are to be provided by Van Wert County.~|~05 - 4R Maintenance - Resurfacing~|~45D5AA0F45D72B2D1265A0DEB17D083AB92A9E3E 101976~|~1~|~1~|~01/STR~|~For work on CR 418 from CR 168 (Convory Road) SLM 2.84 to the Van Wert Urban Area boundary at CR 77 (Libery Union Road) SLM 7.07. 80% Federal rural STP funds from the CEAO, SAC 4B77, with a 20% local match provided by Van Wert County, SAC 4BG7. Funds needed over the CEAO cap are to be provided by Van Wert County.~|~05 - 4R Maintenance - Resurfacing~|~BD96D58AA81BE4F6CCA9C9FA715C5030DAB0E475 109808~|~1~|~1~|~01/STR~|~Resurfacing on SR 613 using district preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~78BC99D35DD6E5E07B4C1080A8736DCB889ACE11 106751~|~1~|~1~|~01/BRO~|~Muni bridge work~|~10 - Bridge Replacement~|~03D14D34391935F6752F9AAC219D9AB01466387E 100806~|~1~|~1~|~01/IMS~|~Bridge sealing on mainline bridges on CLI IR 71 and CLE IR 275~|~47 - Bridge Preventive Maintenance~|~CB81189D32F732C2CB4480EC061D53562C08992B 100806~|~1~|~2~|~02/NHS~|~Bridge sealing on mainline brigdes on CLI-73 and CLE-32~|~47 - Bridge Preventive Maintenance~|~E6708B76BDE419D11B87E7A7C01482DBFDBEA5B5 97706~|~1~|~1~|~01/ENH~|~Construction of new hike and bike trail.~|~~|~60335D08E0BEC8F0B897F41237EBA5A9D25F9E0D 92354~|~1~|~1~|~01/STR~|~Rural route. GSMP funds. Failed rock embankment. layback slopes to mitigate rockfall.~|~04 - Reconstruction - No Added Capacity~|~64DBBF851A9F042489EC719F1586782C69CC715B 113925~|~1~|~1~|~01/S>2~|~Replace existing bridge from new rear approach slab to new forward approach slab; replace existing guardrail on both sides of the road.~|~10 - Bridge Replacement~|~BD0F9C213E672035FC37EAA9C67258A50CD0C072 106684~|~1~|~1~|~01/ENH~|~Construct bridges on existing abutments for the Moonville multi-use trail. TAP funded project. Funded 95 federal/5 local.~|~28 - Facilities for Pedestrians & Bicycles~|~D0E4BF6F55A6EBFEC948DCEC9D4866BEF9D7291F 123917~|~1~|~1~|~01/STR~|~Slope stabilization along SR 13 and 93 in Perry County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E61E003E3F0832A5A2CDCCDC2F3FD6836941F47 123917~|~1~|~2~|~02/NFA~|~Slope stabilization along SR 555 in Perry County.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D2DF28D278EBDA209FF65F8011F27191CC67B25E 102850~|~1~|~1~|~01/NHS~|~District wide Bridge Maintenance project. SCI 52 24.96 (SFN 7301561)~|~13 - Bridge Rehabilitation~|~C39886DA070E4FCEA097BE753F440C8833265F4E 102850~|~1~|~2~|~02/STR~|~District wide Bridge Maintenance project. HIG 62 25.33 (SFN 3601382) HIG 62 26.20 (SFN 3601412) ROS 138 10.87 (SFN 7104081)~|~13 - Bridge Rehabilitation~|~ADCACC0B3A914338A8992B60216DFCE73DD4E9D1 117879~|~1~|~1~|~01/NFP~|~Split for cracksealing work~|~99 - State Preventative Maintenance~|~24B82E7E8D539B3AE276D8AC789F693014452898 87283~|~1~|~3~|~03/NHS/STRE~|~POR SR 14 from 1.45 to 1.71 urban paving 80/20 items in the City of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~05A7DD32572FF29B3AB8D4676807B675F68EB1A5 87283~|~1~|~2~|~02/IMS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~B64295A50EA2F45A33DB5930F3CA59FB3D95BFBD 87283~|~1~|~1~|~01/IMS~|~POR IR 480 0.00 to 1.45.~|~05 - 4R Maintenance - Resurfacing~|~88F6C4CFFB8D15B18D3D0136A25575032B16DC76 87283~|~1~|~4~|~04/SAF~|~Safety improvements at POR-IR480 and SR14 interchange with Sheets Driveway. Includes installation of quick curb and pavement marking adjustments.~|~21 - Safety~|~886002D97A100389984C0B9471E635B4B2A627FA 110154~|~1~|~1~|~01/IMS~|~Bridge repair~|~13 - Bridge Rehabilitation~|~59C5CA5DDD8E7102A6FD4F07B24848872CB7DA7C 110154~|~1~|~2~|~02/S>2~|~Bridge repair~|~13 - Bridge Rehabilitation~|~93D9B7CC3C30668D6AA2C6669D3AE717DB1C66A1 95857~|~1~|~1~|~01/NFP~|~at SLM 7.59 and SLM 9.85~|~44 - Other~|~4DC2325F4B71308D9A8DB3166967FB5E9E3EBFD1 125889~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. NOB 83 0.00-6.743~|~05 - 4R Maintenance - Resurfacing~|~91A7F2B31FB03030E69D52F62853D02D963999A2 114651~|~1~|~1~|~01/NHS~|~Project to replace and raise Wesley Rd over SR562~|~10 - Bridge Replacement~|~13713C40A664AC19F762298CF598DA81E63C7F80 114651~|~1~|~2~|~02/NHS~|~Cost associated with DMS Sign replacement using TSMO funds. These funds shall be capped at $325k. See 9/19/25 email (Shell, Collett, Grake, Scanlon, Yoh, Comer, Rowe). ~|~24 - Traffic Management Engineering - HOV~|~B01178EAB44666E4DD8337CA543536AA11443787 116677~|~1~|~1~|~01/STR~|~For resurfacing on SR 103 in Hancock County from SLM 11.39 to 16.96 & 19.03 to 23.11~|~05 - 4R Maintenance - Resurfacing~|~436A1AEF5F0F6182D3EF4BCF06F581796ABAD142 96084~|~1~|~1~|~01/STR~|~"01/STR/OT/ " Plan Split for construction of a loader/equipment building at the SR 93 / SR 662 Intersection~|~44 - Other~|~2CB60FD0AE707666C72D625806393947E1E10CE6 93385~|~1~|~1~|~01/ERD~|~Construction of trailhead and amenities along the TRU-Greenway trail in the City of Warren.~|~28 - Facilities for Pedestrians & Bicycles~|~B9B54C8B1AC7931CE77130AA5C5E082BFA888CD4 96734~|~1~|~1~|~01/NHS~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~5581BCF9CB1BD03D2B8BFE1DD76835F61A857F17 109132~|~1~|~1~|~01/NFA~|~Landslide repair project. MEG 143 11.57.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DE6700A73920871C708BB058E91A46EF4C81F05E 110436~|~1~|~1~|~01/SAF~|~Improve intersection of SR 161 at Karl Rd~|~21 - Safety~|~CD680FA52156C12FA01E665797B5CADEC73E4869 110436~|~2~|~2~|~02/SAF~|~Columbus BMP items~|~21 - Safety~|~293EE028D670B1AB121307C6E62DCBBCB09C4C1A 119501~|~1~|~1~|~01/BRF/PRCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~259B4E45F9B33315D32421D4B509C9311081110B 124663~|~1~|~1~|~01/SAE~|~Upgrade pavement markings on various Pickaway County Roads~|~21 - Safety~|~124F3DF05C9D5F61F12F7DCCB3402C59CA69B132 123225~|~1~|~1~|~01/S5K~|~270' landslide repair on SR 536 at the 1.34mm.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A16D586CF95F2DFBDEA09B9D137EAD06B26BB276 119488~|~1~|~1~|~01/IMS~|~Landscape maintenance at various interchanges.~|~44 - Other~|~941735A633FC2BAB47B2E847CC752A45D3873CAA 126782~|~1~|~1~|~01/NHS~|~Project to reconstruct US-6 in Williams County SLMs 3.34-13.88~|~04 - Reconstruction - No Added Capacity~|~B725B3891100D9F31B07D3AE483A4BAFD0A69336 88618~|~1~|~1~|~01/NHS~|~Overlay SR 4 in Clark and Champaign counties with fine graded aggregate.CHP SR 4 SLM 0.00 6.97CLA SR 4 SLM 17.66 - 24.85~|~05 - 4R Maintenance - Resurfacing~|~0B620AE78604E2E654D587FD9EB55C6B676279F2 88618~|~1~|~2~|~02/STR~|~Bridge: CHP-29-3145 - Remove asphalt wearing surface, waterprook and overlay with asphalt concrete, remove and replace existing poly, modified expansion joints.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~B5111EC33427EB1B876FB773A0E1E46FDD1A3685 88618~|~1~|~3~|~03/STR~|~Overlay SR 29 in Champaign CountyCHP SR 29 31.38 - 33.96~|~05 - 4R Maintenance - Resurfacing~|~570219A16AB54EC371EF25FE91C2F34B31691CF5 113504~|~1~|~1~|~01/SAE~|~Guardrail replacements/upgrades on various county routes throughout Summit County.~|~21 - Safety~|~319732FBED5BC011E32496572AC04B6E62F10593 85392~|~1~|~1~|~01/S>2~|~80/20 funding split for work eligible State STP funds~|~05 - 4R Maintenance - Resurfacing~|~440AC4761D80BE6BFE457175FD97AFB2CBDA4E76 85392~|~1~|~2~|~02/S>2~|~100% local funding split~|~05 - 4R Maintenance - Resurfacing~|~A3372C0542403FDA31C9C88A2CE54E653913D701 96625~|~1~|~1~|~01/NFP~|~All work is in this split. Funds from the District Preservation Program budget. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds.~|~21 - Safety~|~7B908E108C291D801C6B2DC1120E0C14F97339CD 124180~|~1~|~1~|~01/IMS~|~Major rehabilitation on the existing 4 lanes of PRE-70~|~04 - Reconstruction - No Added Capacity~|~280DCD8EE2D6594B1A608D33D170CE2847EE1367 124180~|~1~|~2~|~02/IMS~|~Plan Split for the added new lane in each direction~|~03 - Reconstruction - Added Capacity~|~96BA216F50401B67C7C67977079420C23B871E6A 101715~|~1~|~1~|~01/NFA/PCEO~|~Perry County CEAO Paving Funds - 4B77 (80% Federal) / 4BG7 (20% Local) - See CAP Comment - Resurfacing using mill & fill on CR11 (Minor Collector) from 00.00 to 09.67~|~05 - 4R Maintenance - Resurfacing~|~81B3C3C56CAD8D1158397241DF41047B0C3D40CB 114889~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~70AF0A7E286EEBC97D3C54470A07E2BEC83082FB 114889~|~1~|~2~|~02/STR~|~Minor bridge work.~|~~|~C261D47A84DD7E7183C01BE18D66FBB6DD189259 114889~|~1~|~3~|~03/STR~|~Minor bridge work.~|~~|~8AD5D6488EEA4F054A7851601D21A16E2B5EB241 116656~|~1~|~1~|~01/IMS~|~Plan Split for longitudinal joint repairs on a portion of CLI-71~|~05 - 4R Maintenance - Resurfacing~|~F80576323EC148A26F93ABBD1C4E25B12EA223A3 101898~|~1~|~1~|~01/NFA~|~Canfield Township.~|~44 - Other~|~3DA0D953B018D1E8134ACDA601918A2C8BCD0686 117930~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-77-E~|~63 - Electric Vehicles & Charging Infrastructure~|~92855DEF24340208F40669782E63C6CE4E9D594D 105130~|~1~|~1~|~01/NFA~|~District Preservation 7BPB/4PS7(100% State) - See CAP Comments - Resurfacing of Per-204-00.00 to 10.00~|~05 - 4R Maintenance - Resurfacing~|~342F9857F3CD587C1C427E73DED232B3027C8643 109888~|~1~|~1~|~01/STR~|~Culvert replacement project. Locations TBD. Funded 80 federal/20 state.~|~~|~FE1F80340A8621CC7F21D14007BA004FC9885785 92617~|~1~|~1~|~01/MPO~|~mill & fill~|~05 - 4R Maintenance - Resurfacing~|~31C385F480BFEE4FB3E8F05888202E3EA36768C3 92617~|~2~|~2~|~02/MPO~|~Added Plan Split for 100% Local Items~|~05 - 4R Maintenance - Resurfacing~|~5088DF97FB0142E629BCAF878B4458F2860E8FE4 96353~|~1~|~1~|~01/NFP~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2014-2015 used for construction inspection services.~|~17 - Construction Engineering~|~A45A498D07BA3A880BB7E6E91287B860472D04CE 96189~|~1~|~1~|~01/NFP~|~Construct a loader storage facility in the Parkman Outpost in Geauga County.~|~17 - Construction Engineering~|~247D4D2B786821166E4BCF47B6396254F52507E4 124409~|~1~|~1~|~01/ENH~|~Federal items.~|~28 - Facilities for Pedestrians & Bicycles~|~D3E8DBF98E40215B7059B37820A1E6F943523BDA 124409~|~1~|~2~|~02/ENH~|~100% Local Items~|~17 - Construction Engineering~|~1529FDA5F1713A67BE8D57A2A2E352317E6720E6 103492~|~1~|~1~|~01/ENH~|~Installation of decorative hardscape elements such as brick pavers, seating walls, and lighting within the intersection area of Colonel Glenn Highway and Presidential Drive.~|~31 - Landscaping & Other Scenic Beautification~|~0DCA08B4FECD6DF82C41093161B63906F0DE9F7B 103492~|~1~|~2~|~02/MPO~|~Plan split covers 100% city funded upgrades to the signals at the intersections of Colonel Glenn with (1) Zink Road and (2) Presidential Drive.~|~31 - Landscaping & Other Scenic Beautification~|~EFC0ACB6D070D5B9D6A03806D3DA4EAF69A2882C 123913~|~1~|~1~|~01/CMQ~|~Improvements to the intersection of 6th Street and Riley Boulevard including addition of turn lanes and traffic signal improvements. Construction of a shared use path along 6th Street east from the intersection to Sunnybrook Drive to connect into the Clear Creek trail.~|~21 - Safety~|~EE30DD9EDF244B5B79000519E8D60C4E1C22B6E1 121368~|~1~|~1~|~01/NFP~|~plan split.~|~44 - Other~|~23385AA2579DED2249BD4696606791788EAA919C 120567~|~1~|~1~|~01/ERD~|~Plan Split for RAISE eligible scope~|~04 - Reconstruction - No Added Capacity~|~4239C92E83A36141541520AFD18998B87C84BF68 120567~|~1~|~2~|~02/NFP~|~Plan Split for scope not eligible for RAISE grant funding, such as water and sewer line replacements~|~44 - Other~|~6D961697EBFB976ABE7A7335589551A70CE7CFD4 92632~|~2~|~2~|~02/MPO~|~Entered Plan Split for 100% local Items of Pavement Repair per the Stage 2 Estimate~|~05 - 4R Maintenance - Resurfacing~|~8F5E06C9FC53D81C36F0E80FE00E0E2F7BC31808 92632~|~1~|~1~|~01/MPO~|~Entered Plan Split for Mill & Fill using Large City Funding~|~05 - 4R Maintenance - Resurfacing~|~B07DC40A84736218BD531628DBBDFDF54553187D 86013~|~1~|~1~|~01/S>2~|~Urban paving in Columbus from Brown Rd to 4th St.FRA-62 SLM 11.69-14.7901/S>2/PV/~|~05 - 4R Maintenance - Resurfacing~|~A5E0C5B41BE80CD9393BD265C753AADECACC343A 81085~|~1~|~1~|~01/STR~|~General system paving of PIC 316: 9.48-11.01~|~05 - 4R Maintenance - Resurfacing~|~3B2883B5D833FDAB0BB9BD1D97C6C451D1CE4182 81085~|~1~|~4~|~04/S<2~|~Minor bridge work on 1 structure (not Br eligible):6503136 PIC SR316 11.95 Intersect: Mud Run Creek ~|~05 - 4R Maintenance - Resurfacing~|~3FDB75EA6F61B6E65A8C51B5C497B0C1168CC864 81085~|~1~|~3~|~03/STR~|~Minor bridge work on 1 structure (not BR eligible):6503101 PIC SR316 9.84 Intersect: Scioto River #~|~05 - 4R Maintenance - Resurfacing~|~AC69992CACACEA7FEE566272E00DD7341CDAFD42 81085~|~1~|~2~|~02/S<2~|~General system paving of PIC 316: 11.01-11.27, 11.55-14.05In Ashville S Bloomfield func class area~|~05 - 4R Maintenance - Resurfacing~|~D0DF38C1CF010A6D0E86753C9BA453214DA3F606 92411~|~1~|~4~|~04/NHS~|~Geological Site Management Funding - 4SF7 (80% Federal) / 4SS7 (20% State) - No CAP - Embankment removal along Lic-SR 16-14.34 to 14.64~|~21 - Safety~|~6316D3775EE56DD9F745B291DAF2C036981D4808 92411~|~1~|~1~|~01/NHS~|~District Preservation Funding - 4PF7(80% Federal) / 4PS7(20% State) - See CAP Comment - Replacement of 4506332 LIC SR661 0.02 Intersect: SR 661 Over SR 16; Not BR Eligible for Replacement: Length=238 SD/FO(0) SR=73.2 DSR=5~|~10 - Bridge Replacement~|~61A3ADCE8314D9DF062931AD2CD936A47803F00D 92411~|~1~|~5~|~05/ENH~|~Enhancement costs associated with bridge vandal protection fence - 100% 4BG7 (Village of Granville)~|~~|~657D3A66D46A37833670EF03F1550713A17EAD71 92411~|~1~|~3~|~03/S<2~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Repair and replacement on State Route 16/37/661 outside the interchange ramps and the intersection of SR 661 and Weaver/River Roads.~|~04 - Reconstruction - No Added Capacity~|~9A0CE738564B87ABCF80E9EE5AF73E8C42AF24C8 92411~|~1~|~2~|~02/NHS~|~LCATS & Granville CMAQ Funding - 4TB7(80% Federal) / 4BG7(20% Local) TRC Authorized - See CAP Comment - Lane widening and turn signals for the ramps and roadway between the ramps on: 1) LIC-SR 661-00.00 to 00.25; 2) LIC-SR 37-16.43-16.59;~|~04 - Reconstruction - No Added Capacity~|~FFF95AD066D746EB6C95E6C480C7997EF67204D4 92411~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~C01E0CD6E76BB60AE20DB3C764DD76119377449F 85602~|~1~|~1~|~01/STR~|~JAC CR9 0.12-0.4 Keystone FurnaceOn US35 SLM 14.54 & Keystone Furnace Road (CR9). It is proposed to construct a separated grade intersection over US35. The project involves constructing a jug handle type grade separation over the 4-lane US35 @ CR9 (Keystone Furnace Rd.)/US 35 intersection. 80% Fe3d/20 split w/Jackson County providing the 20% local match. 80% on CO CC ARC (4D37) and 80% on CO CC 01 (RHB7)~|~04 - Reconstruction - No Added Capacity~|~8E5A52335322D184F16016D6C32D11D6B75D5629 85602~|~1~|~2~|~02/ENH~|~JAC CR9 0.12-0.4 Keystone FurnaceThis plan split only for enhancement portion of the project. Plan Split for Enhancement. 80/20 split w/Jackson Co. providing local match. ~|~04 - Reconstruction - No Added Capacity~|~CF7C80CBF6D73BDEF287D4094959D50F527BBDBC 85602~|~1~|~3~|~03/STR~|~JAC CR9 0.12-0.4 Keystone FurnaceNew BridgeOn US35 SLM 14.54 & Keystone Furnace Road (CR9). It is proposed to construct a separated grade intersection over US35. The project involves constructing a jug handle type grade separation over the 4-lane US35 @ CR9 (Keystone Furnace Rd.)/US 35 intersection. ~|~08 - Bridge - New Construction~|~D49853BFC5C3D27AB20C8697764314972E20F76A 118616~|~1~|~1~|~01/SAE/MCEO~|~Replacement of guardrail along various county routes.~|~21 - Safety~|~F880322236A11F44AB95AACAF3800C7AC0B2E8BE 98804~|~1~|~1~|~01/MPO~|~80/20 federal with local matching funds for eligible resurfacing work items.~|~05 - 4R Maintenance - Resurfacing~|~2E098E4ED676E59C9BC4140A1879213F99086B88 91970~|~1~|~1~|~01/STR~|~ADA US52 0.00 - 8.27 resurfacing projectProject Description: It is proposed to resurface 8.27 miles of US52 Brdgs to be paved thru:0101648 ADA US52 1.1 Intersect: Little Three Mile Creek0101664 ADA US52 1.92 Intersect: Buzzard Roost Creek0101680 ADA US52 3.01 Intersect: Elk Run0101710 ADA US52 5.43 Intersect: Owl Hollow Stream0101745 ADA US52 6.2880/20 split~|~05 - 4R Maintenance - Resurfacing~|~C824D24857F94774226894437C2565A6412E8C65 107802~|~1~|~1~|~01/NHS~|~FAY-35-4.54 to 7.42 FAY-35-11.97 to 17.39~|~05 - 4R Maintenance - Resurfacing~|~15B9586990B6CCAC84101AB9510FE655CE4676E0 107802~|~1~|~2~|~02/NHS~|~Bridges on FAY-35-4.54 to 7.42 and 11.97 to 17.39 SFNs: 2400448, 2400359, 2400472, 2400405, 2400413, 2400502, 2400499, 2400561, 2400553, 2400596, 2400618, 2400642 and 2400650~|~47 - Bridge Preventive Maintenance~|~7752DD9CD37CFBCF117D4E40AEFB5FC11030D850 107802~|~1~|~3~|~03/NHS~|~Work to repair damage caused by vehicle accidents.~|~05 - 4R Maintenance - Resurfacing~|~577C63E328C571533E63002BDF72D92EF5444FE4 105133~|~1~|~1~|~01/NHS~|~AC Overlay with repairs on BUT SR 129 15.89 to 24.00~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BA6ADA2728E68D898C87B5513D86349A73937F8B 105133~|~1~|~2~|~02/NHS~|~Funding event for bridge work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E4055D52E6ECA46877F1CF404FB60355216646FF 91065~|~1~|~1~|~01/IMS~|~Minor Joint Repair and Diamond gringdin of the existing concrete pavement on MOT IR 70 from the Great Miami River Bridge (SLM 17.41) to Clark/Montgomery County Line (SLM 23.55)~|~05 - 4R Maintenance - Resurfacing~|~FB36041D61C550D5943BE063BCC52BC020307670 86555~|~3~|~3~|~03/NHS~|~Split for 100% local items.~|~01 - New Construction~|~201A3A8AF07B649C520438511D4A83FC64D1A4A3 86555~|~1~|~2~|~02/ENH~|~Central Office Enhancement funding for shared use path~|~28 - Facilities for Pedestrians & Bicycles~|~64951AD7C8DFFDAE6C9893E7E39C27E8C07323AE 97973~|~1~|~1~|~01/IMS~|~Plan split for all Major Bridges HAM-71-0000L, HAM-71-0000R, and HAM-75-0022R.~|~13 - Bridge Rehabilitation~|~BC0F579232A56DBD83ECA562879BBBA0C8B541B1 101340~|~1~|~1~|~01/NHS~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~780C5CA4C9958315464C127B5171F5662A9AF1BE 120732~|~1~|~1~|~01/CMQ~|~Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley View Ln.~|~04 - Reconstruction - No Added Capacity~|~C8F6FB94E51076404EBDF882BE90F659EDEA07E8 127184~|~1~|~1~|~01/CMQ~|~Federal CMAQ items~|~24 - Traffic Management Engineering - HOV~|~FF02368E0CA64BD2621BF480A91DF88A1869F77F 103013~|~1~|~1~|~01/S<2~|~resurfacing from 0.00 to 0.43 (N. Johanna Drive) and 0.72 (Lake Glen Court) to 1.04~|~05 - 4R Maintenance - Resurfacing~|~ABD0534CAB6DE975A9DA34E0535E87AA0D17DC8A 103013~|~1~|~2~|~02/S<2~|~resurfacing from 0.43 to 0.72 (N. Johanna Drive to Lake Glen Court)~|~05 - 4R Maintenance - Resurfacing~|~DE8CCD3F16B7F7CB4956693EA8D3FC3991BA4885 101996~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~D9AFFE0426A09A609DA7DD93F541B5B1CB77ABD4 93013~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Work on Lic-70-2015 and dck sealing on the remainder of the bridges~|~47 - Bridge Preventive Maintenance~|~0D7CCA03F7DD0DFDBB78BA69C98AD988EBDEF231 93013~|~1~|~3~|~03/SAF~|~District 5 Safety Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - See CAP Comment - For widening of the IR 70 EB ramp to SR 13~|~05 - 4R Maintenance - Resurfacing~|~682A951549EE229821B7DBC9B69E633F1E1FD88E 93013~|~1~|~1~|~01/IMS~|~District Preservation Pavement Funding - 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing with related work on selected Interstate segments~|~05 - 4R Maintenance - Resurfacing~|~323190C9E04EE0FCE030A37964A568FA5078C197 93013~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~47 - Bridge Preventive Maintenance~|~CD524D9FF1B9FCD84279E8CE1C4D3A2E93D9D278 97030~|~1~|~1~|~01/NHS~|~SCI US 52 21.84~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2E41CE8D4588BE64222BAA5A5285C08271D6DE3A 112416~|~1~|~1~|~01/STR~|~On CR 29 pavement rehabilitation project funded at 100% using (4SH7) Local Roads Oil and Gas Shale Program and OPWC (4BG6) funds.~|~05 - 4R Maintenance - Resurfacing~|~17FD4D2B3CD37A58FEF9852F9A08AADD5A967023 112416~|~2~|~2~|~02/STR/HAS~|~100% LNTP~|~05 - 4R Maintenance - Resurfacing~|~FB3F885276D58EE6C526C86D350D604BFF971571 125909~|~1~|~1~|~01/NHS~|~Establish pro rata percent~|~44 - Other~|~76F7BD646E022849BC4F534E4D23EA5522D815AE 87284~|~1~|~1~|~01/NHS~|~See linked structures >20' span.~|~13 - Bridge Rehabilitation~|~B14E0C723A2A57C1E37910724008B4AB1966A76E 87284~|~1~|~2~|~02/NHS~|~Catch basin reconstruction.~|~44 - Other~|~81E7FC43681CBE8FBD937E82CC2CB29330012732 113097~|~1~|~1~|~01/STR~|~Plan split for WIL-191-0574 bridge replacement~|~04 - Reconstruction - No Added Capacity~|~F8CDCB2B051102DEDDBF2421F5BF8ED0BCA8A7EF 86047~|~1~|~1~|~01/BRF/TORO~|~"01/BRF/BR/Toro" - Toronto; replace the existing bridge on existing alignment, carrying Titanium Way over Jeddo Run and Jeddo Run Road (Lynn Drive.) 0.1 Mile South of Intersection Franklin Ave. Construct approximately 400? of sidewalk adjacent to curb along the west side of the road and on the bridge, beginning at the parking lot of Titanium Metals and ending at the existing sidewalk at Valley View Place. Also improve Titanium Way/Franklin Avenue Extension intersection by increasing the radii to better accommodate trucks.~|~10 - Bridge Replacement~|~15391AFD3D848BC0602BBE0B0BBE0B86C751309B 100378~|~1~|~1~|~01/STR~|~Work on SR 697 from the beginning of the route at SR 116 to the Delphos Urban Area boundary at the bridge over West Jennings Creek at 5.49. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~62C53B490ED93F8B700EBE6C33EC4D626257FDAA 100378~|~1~|~2~|~02/S<2~|~Work on SR 697 from the Delphos Urban Area boundary at the bridge over West Jennings Creek at 5.49 to the west corportation limits of the City of Delphos at 6.58. Federal and state funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~FFAC425C60FA5EA5B2A830139983E966F898DC80 115657~|~1~|~1~|~01/BRF~|~Replacement of SFN 4930053~|~10 - Bridge Replacement~|~D9DB045165A10A5AACA9B68795EEE1B64E53C4F7 123210~|~1~|~1~|~01/NFA~|~Created for J&C Involvement~|~44 - Other~|~0A8BE73060B010CA141E17D7B34DC74163CD2E42 88635~|~1~|~1~|~01/S>2~|~D6 funding for general system two lane resurfacing~|~05 - 4R Maintenance - Resurfacing~|~896BB84E7ED18D834798DB6718FE9F56271D7349 102769~|~1~|~1~|~01/NHS~|~This plan split is for work on NHS bridges.~|~13 - Bridge Rehabilitation~|~52CAA818B83640A5110F02605E8A9CD9454A94AF 116185~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~04 - Reconstruction - No Added Capacity~|~7F2F999C075BFB2A89F8D21FD08D1A541A2C6BE3 101327~|~1~|~1~|~01/NHS~|~Structure replacement.~|~10 - Bridge Replacement~|~739C6546BD9A560B3C577839671A1A90FD3BD280 101327~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~10 - Bridge Replacement~|~E3FD3A86CFF6A3E4098F1DA9100EEBE5B9771EE2 123774~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~78A9EEA92F0269242CFC51EC3567E0361252306C 92692~|~1~|~1~|~01/STR~|~This is for the portion of the project outside the Van Wert Urban Area. SR 116 from SR 117 slm 2.51 to the Van Wert Urban Boundary at 17.80. All funds from the District Preservation Program.~|~05 - 4R Maintenance - Resurfacing~|~3F1AEAE7A5F2EC1A1B94FD0314A71C394340C537 92692~|~1~|~2~|~02/S<2~|~This is for the portion of the project inside the Van Wert Urban Area. SR 116 from the Van Wert Urban Area boundary at 17.80 to end of the project at the Middle Point Road at 18.15. All funds from the District Preservation Program. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~29B5747B97CD7E8E34026B48582670BEA6404D92 92692~|~1~|~3~|~03/NFA~|~This is for the portion of the project on SR 116 in Van Wert County from the Auglaize County line at 0.00 to SR 117 at 2.01. This section of SR 116 is classified as a Rural Minor Collector and not eligible for federal funds. All funds are from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~C6CA40B1195E98D7D0D598FB9CD4FE0DBC2D78C4 101405~|~1~|~1~|~01/IMS~|~District Preservation Bridge Program - 4PF7 (90% Federal) / 4PS7 (10% State) - Bridge Cleaning and Sweeping on Interstate Routes~|~47 - Bridge Preventive Maintenance~|~6E3509D8493EFBB6D78B5427385076A22903AFA1 101405~|~1~|~2~|~02/NHS~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on NHS Routes~|~47 - Bridge Preventive Maintenance~|~FCA3CB3D651710EFCF9BC9EA7B42238B3E67C565 101405~|~1~|~3~|~03/S<2~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Urban Routes~|~47 - Bridge Preventive Maintenance~|~CB7E1542599B8B66646FB7FC54D870E1E5B59200 101405~|~1~|~4~|~04/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - Bridge Cleaning and Sweeping on OFAH-Rural Routes~|~47 - Bridge Preventive Maintenance~|~41FCAA83DFD43BD70A4769D893EB5FE46987F4AA 101405~|~1~|~5~|~05/NFA~|~District Preservation Bridge Program - 4PS7 (100% State) - Bridge Cleaning and Sweeping on NOFAS-Rural Routes~|~47 - Bridge Preventive Maintenance~|~E1B79D79C60EC37832CA79C2958E3532EAD9CB4E 111023~|~1~|~1~|~01/BRO~|~Bridge replacement project. VIN 124 5.09, SFN 8201293. On system eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~3FC85BA96B529FE56389FABF7C33C1C340F08CA1 117578~|~1~|~1~|~01/NFA~|~This plan split includes all work required for the project~|~28 - Facilities for Pedestrians & Bicycles~|~15E2C4C21F7A252AB5CABF451821439876CB2233 109925~|~1~|~1~|~01/S<2/HEAT~|~LCATS STP Funding - 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Resurfacing and related roadway work on CR 343 and CR 301 in the City of Heath.~|~05 - 4R Maintenance - Resurfacing~|~B8FF1B6CF86EC5259C03DA583C9780044A98F408 109925~|~1~|~2~|~02/S<2/NEWA~|~LCATS STP Funding - 4TA7 (80% Federal) / 4BG7 (20% Local) - See CAP Comments - Resurfacing and related roadway work on CR 301 in the City of Newark.~|~05 - 4R Maintenance - Resurfacing~|~4D33F0E270483A5FA2AD49D2D98E90B14FCF028B 97289~|~1~|~1~|~01/SAF~|~FY2019 District wide raised pavement markers.~|~21 - Safety~|~DC6F5F777B942EBB522BBD6B77BA0F1361B6D0CA 85376~|~1~|~1~|~01/STR~|~Replace culvert at SEN SR587 10.65-10.66~|~04 - Reconstruction - No Added Capacity~|~20467A1814A6F52BA1AAC222F644127DE979BEF6 109336~|~1~|~1~|~01/NFP~|~ODNR resurfacing project at Strouds Run State Park campground~|~05 - 4R Maintenance - Resurfacing~|~15C02A899858CC06B21BEEA02C542F2F1FD04ECC 84528~|~1~|~3~|~03/NHS~|~Funding Split for NHS contract for the following bridges: HAM-50-0800 HAM-126-1906~|~04 - Reconstruction - No Added Capacity~|~001A3C9347DDD9AB4C0B7C168FEFE189EE6C4676 84528~|~1~|~2~|~02/STR~|~Funding Split for STP Rural includes the following bridges: BUT-73-0471 PRE-127-1051 WAR-350-0285~|~13 - Bridge Rehabilitation~|~0438257FEA1F9C0A3FA9BCEE107A8FEEEF2C7B80 84528~|~1~|~4~|~04/S>2~|~Construction Funding split for STP Urban areas > 200k population for the following bridges: HAM-42-0000 WAR-42-1043~|~13 - Bridge Rehabilitation~|~8920EC93CDB795A435AFDA26C0960CD074A5C25E 84528~|~1~|~1~|~01/IMS~|~Interstate Maintenance Construction Funding event to cover the following bridges: HAM-71-0752 GRE-675-1600L, GRE-675-1600R, HAM-275-1070R, HAM-275-1080L, HAM-275-1080R, HAM-275-1080S, HAM-74-1116L, & HAM-74-1116R.~|~13 - Bridge Rehabilitation~|~DC2B005808051057351EC1A4DB6E0BC3F947341E 124702~|~1~|~1~|~01/S50~|~Cedar Point Drive Paving Project from Cleveland Road to First Street.~|~05 - 4R Maintenance - Resurfacing~|~3AE553C9DF72F11B6213118E1FB6DD942697ACD0 94629~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO Enhancement funds to be used on Fleet Avenue for minor rehabiliation and new streetscape elements.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EDF031E9F612529D9D785110326021D1752654C4 82050~|~1~|~1~|~01/BRF~|~This split is for work eligible for federal off system BR funds. Work to replace the bridge and up to 400 feet of approach work on each end of the bridge is eligible.~|~10 - Bridge Replacement~|~622939F055A0DD5D54F328D0BF0F5B7FF0708784 114623~|~1~|~1~|~01/MPO~|~This plan split includes all work necessary to construct the project~|~05 - 4R Maintenance - Resurfacing~|~1D79F93CB4190ADE440F4CEFFC9554CDDFCC09B6 114623~|~1~|~2~|~02/MPO~|~FY24 Urban Paving Project in the City of Lebanon on US-42 from Glosser to SR 123, on Main Street (SR-48) from US-42 to SR-48 interchange, and on SR-123 from SR-48 interchange to the eastern corp. limit.~|~05 - 4R Maintenance - Resurfacing~|~9E8EBFFC21BB9067F0693A9D0AF2D22B2D128BD6 117922~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-76-A~|~~|~599FFED89D089C1FB3AE7B23878CCA4157F330BD 120273~|~1~|~1~|~01/S5K~|~Bridge deck replacement project. HOC 93 12.48 (SFN 3702162).~|~13 - Bridge Rehabilitation~|~CA376D466A090F16EF691223E5920F55CBA41DCF 115711~|~1~|~1~|~01/SAF~|~2023/2024 Traffic Signal Maintenance~|~21 - Safety~|~C72007B403C61DEB6CF7C2B5157FAF933B066B36 92029~|~1~|~1~|~01/NFA~|~Salt Dome~|~44 - Other~|~A9CC99D1080E5F730C32DE2C6122CE6F94BEE355 92571~|~1~|~1~|~01/STR~|~Funding for the entire project in Middlefield Village and Middlefield Twp. at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~0C1BF4B7C10B6E2AB4030B5B30736540C953B447 92571~|~1~|~2~|~02/STR~|~100% local participation for the ADA curb ramp construction and paving of the parking lanes.~|~05 - 4R Maintenance - Resurfacing~|~6C6CE163673C973603F35FB1977E57563AB0FBD6 116353~|~1~|~1~|~01/NHS~|~Resurfacing US 22 and SR 7~|~05 - 4R Maintenance - Resurfacing~|~2F4B2585A9608004CF7F2B8378BAA20C58C9210B 125250~|~1~|~1~|~01/STR~|~Pile encasement project. WAS SR 60 14.38, SFN 8402728.~|~13 - Bridge Rehabilitation~|~F626D35601DA37427B09EA0DB9642EED10AE6BB8 125878~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. VIN 689 0.00-3.298~|~05 - 4R Maintenance - Resurfacing~|~0009E24586BB1530558BE5D4EA6B7AC34FE44CCA 83108~|~1~|~1~|~01/NHS~|~"O1/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI US22 11.96-13.16; 2) FAI SR37 13.69-14.4~|~05 - 4R Maintenance - Resurfacing~|~10365AAF64329C3296DA6F43DD89937E4CF637A5 83108~|~1~|~5~|~05/NHS/LANC~|~"O5/NHS/OT/LANC" - Local Funds 4BG7(100% Local) - No CAP - Hauling of RACP in the City of Lancaster on 1) FAI US22 13.16-18.05; 2) FAI SR37 12.92-13.69; 3) FAI SR37 14.4-15.58;~|~05 - 4R Maintenance - Resurfacing~|~12B895CAC4D136DAD0B4A061593C70249ED98CA2 83108~|~1~|~2~|~02/NHS~|~"O2/NHS/PV/LANC" - 75% District Preservation 4PF7(80% Federal) / 4PS7(20% State); 25% Lancaster Big City (STP)Funding 4TA7 (80% Federal) / 4PS7 20% State) - CAP of $775,497.01 of Lancaster's 4TA7 Large City Funds - Urban Paving in the City of Lancaster on 1) FAI US22 13.16-18.05; 2) FAI SR37 12.92-13.69; 3) FAI SR37 14.4-15.58;~|~05 - 4R Maintenance - Resurfacing~|~19A649F3039A230C2547580C5EC9EC2EB43EAEFF 83108~|~1~|~3~|~03/STR~|~"O3/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) FAI US22 10.75-11.96; 2) FAI US22 18.08-18.57~|~05 - 4R Maintenance - Resurfacing~|~427AA80D5B65269273617B192B929FE74DE84900 83108~|~1~|~7~|~07/NHS/LANC~|~"07/NHS/PV/LANC" - Urban Paving on US 22 (Main St) - 4PF7 (80% Federal) / 4BG7 (20% Local) - CAP District Preservation $84,960.00 federal funds) - Share of Uban Paving asphalt resurfacing cost for Main Street in Lancaster. Any overages revert to Plan Split 4 for coverage at 100% City of Lancaster~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9C829DE5B3CCA1BDA032967015FAE7C7EFF0F1E0 83108~|~1~|~6~|~06/S<2/LANC~|~"O6/S<2/PV/LANC" - 75% District Preservation 4PF7(80% Federal) / 4PS7(20% State); 25% Lancaster Big City (STP)Funding 4TA7 (80% Federal) / 4PS7 20% State) - CAP of $256,096.12 in City of Lancaster's 4TA7 funds - Urban Paving in the City of Lancaster on 1) FAI SR188 14.48-16.02; 2) FAI SR158 00.29-02.48;~|~05 - 4R Maintenance - Resurfacing~|~9FCDC3E6C607D4962467A6503C1EF838CA6B5C2B 83108~|~1~|~4~|~04/NHS/LANC~|~"O4/NHS/OT/LANC" - Local Large City Funds 4TA7(80% Federal) / 4BG7(20% Local) - No CAP - Curb ramps and other special request items for the paving in the City of Lancaster on 1) FAI US22 13.16-18.05; 2) FAI SR37 12.92-13.69; 3) FAI SR37 14.4-15.58;~|~05 - 4R Maintenance - Resurfacing~|~A05A9BEA50B78791EAC09818260F2721805CDDC8 95178~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC 56 18.97 (SFN 3701689) and HOC 328 6.79 (SFN 3703754). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~E9647E62B561BF794AB0B4B6B0482E6EB1071B77 100380~|~1~|~1~|~01/STR~|~Work on SR 114 in Paulding County from US 127 to the Putnam County Line, SLM 12.05 to 24.36. All funds from the District Preservation Program budget. No local funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~30398A2BEC958BF9AB472C7F1FBA6F24B0B215FD 92661~|~1~|~1~|~01/S<2~|~Pavement planing and resurfacing the existing roadway with asphalt concrete from SLM 8.72 to SLM 9.90.~|~05 - 4R Maintenance - Resurfacing~|~D6F4952FB4604CFE2E2C757B5FD7BF4A7F07AE5D 81713~|~1~|~1~|~01/BRO~|~Replace steel twin pipe structures at two locations (TUS-36-0769, SFN 7900279 and TUS-360833, SFN 7900309) with four-sided box structures.~|~10 - Bridge Replacement~|~1382F7FCFED3F59380AD924CFA1B7C481DE01E27 82357~|~1~|~1~|~01/BRF~|~CEAO bridge replacement with Union County EngineerBR funds not on federal aide systemUNI-CR 110-1.16/Delawrae County Line Rd over Blues CreekSFN 8032866~|~10 - Bridge Replacement~|~C6E0AB6D215B9281E8F4C31F21783C273970B93D 105906~|~1~|~1~|~01/NHS~|~Split for urban paving eligible items on the NHS Stsem~|~05 - 4R Maintenance - Resurfacing~|~5B3921BD98796F368D385391DBCAF08A533A420D 105906~|~1~|~2~|~02/S>2~|~Plan split for urban paving eligible items on the STP system~|~05 - 4R Maintenance - Resurfacing~|~BE7F3FE8E58345193FC39B2345C4D8F8EFC25C68 105906~|~1~|~3~|~03/S>2~|~Plan split for work items not eligible for urban paving funding and paid 100% by local share~|~05 - 4R Maintenance - Resurfacing~|~82B16415DF4BC551E76FC67CFEB9DBCF0A215E44 94638~|~1~|~1~|~01/S>2~|~80% federal / 20% local fundin split using MPO STP funds to resurface Emery Road.~|~05 - 4R Maintenance - Resurfacing~|~18E879D7A3246643DC3761CDF895D9D61D45EF69 115684~|~1~|~1~|~01/IMS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~768536E60678F03341992E9E732766B7F86BC039 94278~|~1~|~1~|~01/ENH/KCEO~|~"01/ENH/OT/KCEO" - Knox County Heart of Ohio Trail Phase 6 - Construction of muliti-use path from Grahram Road to Thayer Road~|~28 - Facilities for Pedestrians & Bicycles~|~66716899C87B37D4811D164405E520E60730C193 106444~|~1~|~1~|~01/SAF~|~Install wrong way signs with radar technology along as various places on IR 71 from Lytle Tunnel to the Warren County line.~|~21 - Safety~|~CB62EDAD535698B885B8B03FEABA8C24D429B9B8 113143~|~1~|~1~|~01/S<2~|~Roadway resurfacing and striping on Vance Road in the City of Moraine.~|~05 - 4R Maintenance - Resurfacing~|~E6F39E5C955DB0B7B9ECED10C62754E7EE1B55C1 123914~|~1~|~1~|~01/MPO~|~Construction of sidewalk on the south side of W. 4th Street to fill in 3 existing gaps in the sidewalk network. Construction of a Rectangular Rapid Flashing Beacon (RRFB) at David Boulevard.~|~28 - Facilities for Pedestrians & Bicycles~|~1C4B923B59E6265CE528D2AA95DD088C5641A102 112507~|~1~|~2~|~02/S>2~|~Spit 2 for MPO/state funded work in Gates Mills.~|~05 - 4R Maintenance - Resurfacing~|~47A3F23E771E37E0C00F361D7B6D2B170A8C27A3 112507~|~1~|~1~|~01/MPO~|~Split for MPO/local funded work on the urban system in Mayfield Hts~|~05 - 4R Maintenance - Resurfacing~|~ABB4F519997284EF2F02CBF0CF358DD122805B3B 112507~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~E61C74A7E129BB52E886D78DA68306D79FE86E4E 114664~|~1~|~1~|~01/NFP~|~PM (B) FY27.~|~21 - Safety~|~34464CA8363B56962B4B055103F0CCAB3457E144 118826~|~1~|~1~|~01/CMQ~|~Install Bike hub~|~28 - Facilities for Pedestrians & Bicycles~|~34227C97C4E42064AAA34F2EB14F090A0F55AAFD 76997~|~1~|~1~|~01/IMS~|~Project on I-70 from Kelton Ave to SR-310 to address safety & congestion.Currently unfunded.~|~~|~D44A616E3E8305A2A01383EBC59BF05546013CA7 104323~|~1~|~1~|~01/NHS~|~Split for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~2AEFF17776A589183D7E3F3308287EB8D601FC0C 99869~|~1~|~1~|~01/NHS~|~Central (SR-120)/Talmadge intersection~|~21 - Safety~|~F88FC6DDAC6386E93F6698C325F8F9A43AFCAFCE 99869~|~1~|~2~|~02/NFP~|~100% City - Resurfacing Column in Plan General Summary. Funds will be from Ottawa Hills paid thru City of Toledo.~|~05 - 4R Maintenance - Resurfacing~|~6D1B807671C1A4067089C73FE77F2642D407D64F 99731~|~1~|~1~|~01/IMS~|~Interchange split~|~03 - Reconstruction - Added Capacity~|~F6A4C1D3B5944892459A59AAEC11DB384C3E79DF 99731~|~2~|~4~|~04/IMS~|~I 475 over Monclova Road from PID 96482~|~10 - Bridge Replacement~|~00A4B05184F43AD6E536374EF5191B74DE1706EE 99731~|~2~|~3~|~03/IMS~|~Widen 475 interstate.~|~03 - Reconstruction - Added Capacity~|~A9522B88287BDBFBBE675A3DC934757680C5546C 99731~|~3~|~5~|~05/NHS~|~Luc US 24 11.56 to 14.60~|~05 - 4R Maintenance - Resurfacing~|~CFEB0E8B436D77DB2597E12F196D0C7C4AF91E14 99731~|~1~|~2~|~02/IMS~|~US-20A bridge over I-475~|~10 - Bridge Replacement~|~E6A391ABF6482A268098DF1D6232646C4AB70B96 99731~|~1~|~6~|~06/S>2~|~Plan split for locally funded additional cost to upgrade shared-use path~|~28 - Facilities for Pedestrians & Bicycles~|~23948DA85DACE8236927C2BAA033662443892112 99731~|~1~|~7~|~07/NFA~|~Adding split for Bridge Hit~|~28 - Facilities for Pedestrians & Bicycles~|~1A4FC6706EDDD682A03ED882B9B132F31F0EB0A4 115214~|~1~|~1~|~01/BRF/CCEO~|~Replacement of Bridge CLI TR 256 0.02 (SFN: 1447165)~|~10 - Bridge Replacement~|~CC46CE1CDA972380203A5F7CBE346F7FB3BC2299 101960~|~1~|~1~|~01/NHS~|~Mill and Fill under the UPP on:DAR SR 49 SLM 17.64 to 18.03DAR SR 571 SLM 11.12 to 11.23~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5E95307F9156C7A61A1266B95493060608182C31 101960~|~1~|~2~|~02/S<2~|~Mill and Fill under the UPP on:DAR US 36 SLM 13.28 to 13.39DAR SR 571 SLM 12.18 to 13.65~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~99FC2BB9A2B28A09C55B26E63B05E9309A62AC67 102762~|~1~|~1~|~01/S<2~|~Plan Split 01 created for STP < 200000 routes in Washington C.H. Urban Area.~|~05 - 4R Maintenance - Resurfacing~|~BFD297C1B37D13D2A512C33EDE634BFF5A781697 118122~|~1~|~1~|~01/NHS~|~added plan split.~|~21 - Safety~|~E90489CF278561C2D646C65602725C91292A9A09 85111~|~2~|~2~|~02/S<2~|~General System Minor Rehab. on TUS-800-7.51 to 7.83; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~68AEF7E9E35A51143F60B31C90FA7B378139A3FF 85111~|~1~|~1~|~01/STR~|~General System Minor Rehab. on HAS-800-3.34 to 12.72 and TUS-800-0.00 to 7.51; includes asphalt overlay, pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~C27C3CFB0A7D0F75051B8A72550CFAA96ABCDA61 119234~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F51CF04C1A2888390B3DD4A40E85F4E552FCB3D0 119234~|~1~|~2~|~02/S5K~|~All items of work associated with resurfacing of SR 187.~|~05 - 4R Maintenance - Resurfacing~|~C31215AC224F6A3F572B94912354139D1AAC7F95 125451~|~1~|~1~|~01/NFA~|~Culvert replacement project WAS SR 530-4.78 (CFN: 1886238)~|~04 - Reconstruction - No Added Capacity~|~2407B8D5F2F929E41795B1B70C818F2EBE668971 103193~|~1~|~1~|~01/NFP~|~Split for traffic signal maintenance~|~99 - State Preventative Maintenance~|~FC8B0D5B9DA82E5094806194409EED165B85F36D 119603~|~1~|~1~|~01/SAF/CTID~|~Plan Split for federally eligible expenses~|~21 - Safety~|~AC250F141EFC6D1EA470D8933E73540B341E9D73 106715~|~1~|~1~|~01/ENH~|~Work inside the Findlay Urban Area~|~28 - Facilities for Pedestrians & Bicycles~|~7B0E7E0007BF8FA9E28652260A7BF59488D26B82 94132~|~1~|~1~|~01/NHS~|~Major Rehabilitation of MAH US 224 from SLM 13.66 to SLM 19.62.~|~05 - 4R Maintenance - Resurfacing~|~81FEF52E50963CE711DA7FD3A18BDA404F502AF7 94132~|~1~|~2~|~02/S>2~|~Resurfacing of MAH US 224 from 13.64 to 13.66 and MAH SR 625 from 0.00 to 0.22.~|~05 - 4R Maintenance - Resurfacing~|~449376A559FFA411F7DD520920F00613C3D0425E 94132~|~1~|~3~|~03/NHS~|~Minor bridge work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~F86570EF98BB99E52C76542C1295B4EB9077E8F1 94132~|~1~|~4~|~04/NHS~|~Minor work to linked structure with a 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~3A5ADE1411CDD938B4D355F21E81E9C979F2F723 94132~|~2~|~5~|~05/S>2/Meij~|~Intersection improvement at SR-625 and Tippecanoe Road, including signing, signal, turn lanes, in Boardman Township, Mahoning County, Ohio.~|~44 - Other~|~ADCD6BFAF5E47E84D82F9DDC58A8101170A8E18D 94132~|~1~|~6~|~06/SAF~|~Safety items along US-224, including additional striping and quick curb, signing, radar detection.~|~21 - Safety~|~19B20F8A372EA17994F4D2CEB2D9C1587181E213 103256~|~1~|~1~|~01/NFA~|~AC overlay with repairs on non Federal routes: CHP SR 245 SLM 6.16 to 10.72LOG SR 245 SLM 0.00 to 0.87~|~05 - 4R Maintenance - Resurfacing~|~F21B96266FB0DB8D99B13F21908F3FD7D8D46FC7 95192~|~1~|~2~|~02/STR~|~Landslide repair project. DSR NOB-009R (NOB 145 9.45). ER project funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1FB5553E3AAED66261AFF4F198AB5129DCEAD585 95192~|~1~|~1~|~01/STR~|~Landslide repair project. DSR NOB-007R (NOB 145 2.26). ER project funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~787AAA585A6053D6D3632BA5772021AC45088092 117290~|~1~|~1~|~01/NFA~|~ODNR resurfacing~|~05 - 4R Maintenance - Resurfacing~|~EBE931706EF9F8E791FDA6E67AF17938E65A989D 122861~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing of 17th and Velma Avenue entrance drive.~|~05 - 4R Maintenance - Resurfacing~|~8CE53D5944966AEB9BE96342E974F8DDEE516754 122861~|~1~|~2~|~02/NFA~|~Pavement repairs and resurfacing of parking lot south of the Ohio Village and Historical Records Storage at the History Connection. ~|~05 - 4R Maintenance - Resurfacing~|~01E0EE7491DE1DEB586C8FBF8EB3234320567461 113806~|~1~|~1~|~01/BRF~|~Replacement of SFN 3940624~|~10 - Bridge Replacement~|~ED06F413BEF896E4ADA7CF4A281048BCCEB8F747 85540~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation - No CAP -Costs associated with widening of SFN 4503511 and SFN 4503546~|~13 - Bridge Rehabilitation~|~059552758E684B45CB21A17E332937588A535367 85540~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation - No CAP - 1) 4503511 LIC IR70 13.67 Intersect: Ir70 Over Tr 171 - Qualifies for Rehabilitation - 273' - SD(1) - SR=54.7; 2) 4503546 LIC IR70 13.67 Intersect: Ir70 Over Tr 171 - Qualifies for Rehabilitation - 273' - SD(1) - SR=54.7 - - Eligible for all costs associated with the rehabilitation of the existing structures and lanes.~|~13 - Bridge Rehabilitation~|~1B61B3215DEECF023CFF1708E6A36310AA0EBAED 126900~|~1~|~1~|~01/IMS~|~Plan Split for guardrail replacement at linked locations~|~21 - Safety~|~797D6C73A28B35AB5A45FB2D9D84D1C9702DBA48 126900~|~1~|~2~|~02/NFP~|~Plan split for guardrail repair at various locations utilizing 100% State maintenance funds~|~21 - Safety~|~E4E5B6F14CCDBC0A52B5DA1EB7124D740FBDDE7F 100004~|~1~|~1~|~01/IMS~|~Sealing all Major Bridges within District 4.~|~47 - Bridge Preventive Maintenance~|~5EA46E8DD866E4E69DDA91C4AE1B37CFB0E46D66 108798~|~1~|~1~|~01/SAF~|~Signal upgrade 100% federal (90% ORDC 4FP7/10 ORDC 4FA7 as TRC) at the intersection of CR 2 and Market/William Street.~|~21 - Safety~|~181534CB585839ED8C18884C3DD824C7D47B22DE 108798~|~1~|~2~|~02/S<2~|~Pavement rehabilitation on CR 2 from northbound SR 7 ramps to River Rd. with Oil and Shale funds (100% 4SH7).~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~223DFCC0CA087B7F01EF8FDE56E3593F0E257CBA 123745~|~1~|~1~|~01/NFP~|~This project is the District?s long line maintenance contract to maintain the center line, edge line, lane line, and interchange pavement markings with fast dry paint on those routes in the eastern MQS quadrants of the district.~|~21 - Safety~|~F1954C0D342491AE5D27FA6890D51F44A7D0D45A 116732~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~0E239563437ABEE5B4609480467DF2B3C64F8D2A 100571~|~1~|~1~|~01/S<2~|~ROS 28 (0.00-0.96)~|~05 - 4R Maintenance - Resurfacing~|~D75631D5CF72BC45826D4886A1E934648EB81D6A 100571~|~1~|~2~|~02/STR~|~ROS 28 (0.96-8.80)~|~05 - 4R Maintenance - Resurfacing~|~A70A4C9B908CF586B714BC1C9E1615A5E166D4AA 123564~|~1~|~1~|~01/SAE~|~Sugn Support replacement on interstates near Cincinnati~|~21 - Safety~|~5C65478DF7F280EE4596FCEA000DD6BF28A092D1 95770~|~1~|~1~|~01/STR~|~SEN-4 from SLM 7.56 to SLM 13.23~|~05 - 4R Maintenance - Resurfacing~|~3BA1BBF5A1745B48B227C7D82953022233AEC998 107287~|~1~|~1~|~01/NHS~|~Plan split for work items eligible for Urban Paving Funding~|~05 - 4R Maintenance - Resurfacing~|~598DB52A498600D2A3714853C66E1D4A4458532F 107287~|~1~|~2~|~02/NHS~|~Plan split for paving work items that are 100% Local and above the Urban Paving funding~|~05 - 4R Maintenance - Resurfacing~|~19D9A394CF7F5F743CEFE0066A31B214BC1081A6 107287~|~1~|~3~|~03/SAF~|~Plan Split for work associated with Safe Routes to School fudning~|~21 - Safety~|~B1699FAD412B014E76CCA7FE5949686EF4A5D73D 112897~|~1~|~1~|~01/CMQ~|~Split for work to construct EV charging stations~|~01 - New Construction~|~3E0AA5B84AB85D77F0B5DB8A9BEE8DEAD0C81344 93655~|~1~|~6~|~06/BRO~|~test~|~17 - Construction Engineering~|~07577BB7E766E8B5BCA22B18036494857A663BEB 93655~|~1~|~5~|~05/NHS~|~test~|~17 - Construction Engineering~|~99743A82B23ADE2E9975EEBA1391EA716EB20920 93655~|~1~|~1~|~01/IMS~|~abcdefgabcdefgabcdefg abcdefgabcdefgabcdefg abcdefgabcdefg bcdefgabcdef gabcdefgabcdefg abcdefg bcdefgabcde fgabcdefgabcdef gabcdefg~|~~|~A7399CC50BCF0C21C6519F2F6053D5FF0A4352B5 93655~|~1~|~3~|~03/BRO/test~|~test~|~~|~B16AAF5DEFA8A86ADE6AC2A20ED2C7EFCF1F718B 93655~|~1~|~2~|~02/ENH~|~123~|~~|~B8853106B0093D4DD252E10BC5A3EE1F9F04A1FC 93655~|~1~|~4~|~04/BRO~|~Test.~|~~|~D8D5BCE6CC5251DB1CC6B69281BF173884C07C4F 116524~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~BCE52F2564D21B2A78D7EBD83CFEDB3F8904219A 126105~|~1~|~1~|~01/NHS~|~Plan split for all work associated with OTT-53-1163R bridge~|~13 - Bridge Rehabilitation~|~8FED0620D4A1951F7627218127CE87404FABE7FD 80974~|~1~|~1~|~01/IMS~|~Work to widen the Transportation Blvd structure over IR-480 which is eligible for earmark funds for the improvement of this route in Garfield Hts.~|~13 - Bridge Rehabilitation~|~6C434236381ACEE684E28BEF9C938E5F47A258DB 80974~|~1~|~2~|~02/IMS~|~Work on widening the IR-480 WB off ramp in coordination with the Transportation Blvd roadway improvements. Work on the IR-480 EB on ramp in coordination with the widening the Transportation Blvd bridge over IR-480.~|~03 - Reconstruction - Added Capacity~|~482222C0DEFB4F8730C5A5ADBE4F0B4AB55B8EAA 80974~|~1~|~3~|~03/S>2~|~Work on Transportation Blvd pavement widening and improvements including affected sidewalks and drive apron work. Portions of this work is eligible for earmark funding depending on availability. ODOT will participate only on work affecting the D12 HQ property.~|~03 - Reconstruction - Added Capacity~|~BD2CC53344D5F8651CB0989B6561636A2844CB59 93116~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~54775BAFFAE8E366D680B36BEF9A13E581A49BB1 113885~|~1~|~1~|~01/NFA~|~Widen pavement & shoulders on both sides of the roadway to improve the usability and the safety of this facility.~|~03 - Reconstruction - Added Capacity~|~82CD47FD1BF5434AD754CF19FAD1D84265BC383B 87304~|~1~|~1~|~01/NHS~|~Plan Split for NHS routes other than I-275. These routes are: CLE-32 in Batavia and CLE-52 between New Richmond and Point Pleasant.~|~05 - 4R Maintenance - Resurfacing~|~1B189B06129F817012EBCBCA498B63C6615EA2F7 87304~|~1~|~3~|~03/STR~|~Plan Split is for the Rural locations. These locations include: GRE-72 and GRE-235~|~05 - 4R Maintenance - Resurfacing~|~8591F1B721A7CE54E9C05B6BA4E8F4FA18C68355 87304~|~1~|~4~|~04/S>2~|~Plan Split is for the Urban locations on the project. These locations include HAM-32~|~05 - 4R Maintenance - Resurfacing~|~9167803FB152E9DF98DE2AEBA71D313FBBBDF4FF 87304~|~1~|~2~|~02/IMS~|~Plan Split for the interstate routes. These routes include both locations on HAM-275~|~05 - 4R Maintenance - Resurfacing~|~CFC2115A401E667ECB558CCD2EDE4B6E02975198 101469~|~1~|~1~|~01/NFP~|~Raised Pavement Markers~|~21 - Safety~|~5766147886D8CAFBF082F9DB9B1A05FA40D91007 98602~|~1~|~2~|~02/NHS~|~Split for work on the NHS~|~05 - 4R Maintenance - Resurfacing~|~61DE95368C0EC0A515DE332216F3AE891EE67C59 98602~|~1~|~3~|~03/S>2~|~Split for work on the urban STP system.~|~05 - 4R Maintenance - Resurfacing~|~923129696877E77FD4C5DAB652C540005C73A54B 98602~|~1~|~1~|~01/IMS~|~Plan split for work on the interstate system~|~05 - 4R Maintenance - Resurfacing~|~5B0DFDE5B0B54D4831898370BD6A4AE7B41B019A 98602~|~1~|~4~|~04/NFA~|~Split for work not on the federal aid system at 100% state~|~05 - 4R Maintenance - Resurfacing~|~C75105427B0DACAE54F6494061FA471A4D7C3463 98602~|~1~|~5~|~05/NFP~|~Split for 100% local items of work by Mayfield Village,~|~05 - 4R Maintenance - Resurfacing~|~60BC0B7C1FD7C8F1A8C6401B821DC4C9F49C11F1 104988~|~1~|~1~|~01/NHS~|~Plan Split~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9CF07AE8F80B8755465A6E6287FB68E209F8B521 105866~|~1~|~1~|~01/IMS~|~Added CO CO Engr 01 plan split.~|~17 - Construction Engineering~|~B8F09817304D97CAE0F4ED31AABF9653B4D982AC 125074~|~1~|~1~|~01/BRO~|~Plan split to program project. Update when scope is complete.~|~13 - Bridge Rehabilitation~|~4A3F1ACB48588E7A6DFB2224AA1ACE8022F02654 119253~|~1~|~1~|~01/NFA~|~Created for J&C involvement. ~|~44 - Other~|~B640CF64E02F03DBFF3E8D8594216C6E1AB4A59D 103361~|~1~|~1~|~01/BRF~|~Local bridge replacement.~|~10 - Bridge Replacement~|~EB1D89A5D560F4E8E47CA876BAC762EA3DFA39CA 92851~|~1~|~1~|~01/STR~|~SCI SR348 6.94 Slide Repair on SR348, proejct is 0.71 mile east of SR73 junction. 01/STR/OT/State~|~21 - Safety~|~5120458D49974B08D365412B9E10B1DC8E0F774B 120861~|~1~|~1~|~01/MPO~|~install Sidewalk on Springdale Road in Colerain Twshp~|~28 - Facilities for Pedestrians & Bicycles~|~748789D5412B77EB2C9E7AC7DB518163280FED1D 111158~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~9B711F5438134111A5103948C7146257C65BBFBA 23145~|~1~|~1~|~01/BRF/PCEO~|~"01/BRF/BR/PCEO" - County Engineer's Association Funding 4B87(95% Federal) / 4BG7(5% Local) - CAP = $1,417,495.00 Federal dollars - Replacement of: 1) 6430880 PER CR23 2.70 Intersect: Rush Creek; BR Eligible for Replacement: Length=100 SD/FO(2) SR=27.3 DSR=5; 2) 6433340 PER TR169 0.04 Intersect: Buckeye Fork; BR Eligible for Replacement: Length=46 SD/FO(1) SR=48.0 DSR=4;~|~10 - Bridge Replacement~|~53F2E09799DDE0F9584F084A3F0E9CC544494BE6 89213~|~1~|~1~|~01/ENH~|~Constructin an addition to the existing Logan County Museum in Bellefontaine, Ohio~|~44 - Other~|~82AFF0297BC9367D93AF5F85D9EC76248560C81D 115080~|~1~|~1~|~01/STR~|~Culvert rehab and replacement on NOB 821 18.72, CFN 18887552.~|~04 - Reconstruction - No Added Capacity~|~356F4AFDE5C6F81C44756FEDDCCEABE588746713 116162~|~1~|~1~|~01/STR~|~Culvert plan split~|~04 - Reconstruction - No Added Capacity~|~F7177B50AFE9ECBCA5BBB84C022F5C276BCCBA7A 123133~|~1~|~1~|~01/NHS~|~Overlay existing concrete pavement with Asphalt Concrete~|~~|~4F99D5D77C93B7CA803C870711A66CF7F664B383 101483~|~1~|~1~|~01/NHS~|~This plan split includes FAY US 35 0.00-11.97~|~05 - 4R Maintenance - Resurfacing~|~AFB6D3C827E65AACC853A96DB4F1E00511CFE09F 101483~|~1~|~2~|~02/STR~|~This plan split includes sections of FAY SR 435, FAY SR 729, FAY SR 734~|~05 - 4R Maintenance - Resurfacing~|~B049BBC9BA1CD3FCBAF516787597D9CEBDA9BC44 88727~|~1~|~1~|~01/BRO~|~Replace existing structure over Dry Creek (SFN MIA SR 41 0124).~|~10 - Bridge Replacement~|~33A04556B35DE64C13579F8CF36AB718E1813C97 105282~|~1~|~2~|~02/NHS~|~Work associated with items not eligible for urban paving, including curb ramps, auxiliary pavement markings, etc.~|~~|~2D06E45AF184B7DE2567AFE08A1802B05AFF206A 105282~|~1~|~1~|~01/NHS~|~Asphalt resurfacing of SR 39 in the City of East Liverpool~|~05 - 4R Maintenance - Resurfacing~|~F3013EBAE4228D3EFA793511A82BF0477AA2FDF4 109328~|~1~|~1~|~01/STR~|~Wil CR 14 and CR 27 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~2F80D0B606C6E2AA6365BE138FADCC0EF5A81245 109328~|~1~|~2~|~02/NFA~|~Plan split for special federal resurfacing funds on non-federal aid minor collector section of CR 27 from SR 576 to SR 15~|~05 - 4R Maintenance - Resurfacing~|~2446544AB2211D9627D7E8C6AB1F475EAA97CB0B 93209~|~1~|~1~|~01/STR~|~Overlay bridge deck with latex modified concrete, patch abutments, and backwalls using annodes on SFN 5401801 MER 118 2474 ov the St. Marys River.~|~13 - Bridge Rehabilitation~|~58AF9A95C492B429C06B6598A2332CD85F7AB14B 121606~|~1~|~1~|~01/BRO~|~Plan split for overlay of bridge deck, approach slabs and expansion joint repair.~|~47 - Bridge Preventive Maintenance~|~D36C1BB671F6C58A07D76AF711436943F087685B 10787~|~1~|~4~|~04/BRO~|~Split for 100% local pariticipation - CEI~|~10 - Bridge Replacement~|~623C6F003F0D868C7EFC611A04EA646780023E0B 10787~|~1~|~3~|~03/BRO~|~Split for 100% local participation - Dominion~|~10 - Bridge Replacement~|~7626507906202FE36BF212CA85AED06FCA42CDD3 10787~|~1~|~1~|~01/BRO~|~80/20 fund split for federal BRF funds for the waterline relocation portion of the project.~|~10 - Bridge Replacement~|~8C46F2BF2D3DB3FCF284D1226DB28C1D09E5090B 10787~|~2~|~2~|~02/BRO~|~80/20 fund split for federal BRF funds for the bridge portion of the project~|~10 - Bridge Replacement~|~95330B67C0B9AEE7F1A301625E1E2987A711974A 121364~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 172 over Middle Branch Sandy Creek.~|~10 - Bridge Replacement~|~AFBE80BC0818ADC2659789BE08E4B6640406CD35 121813~|~1~|~1~|~01/MPO/POCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5FBCA7A34EC41C193BAE4F3F27F12B21F87533DA 104650~|~1~|~1~|~01/NFA~|~The County will widen and reconstruct 3200 feet of Gypsum Road~|~01 - New Construction~|~5B9E46CC45F30405602FDE6F3F5AC29E0FF1F096 102340~|~1~|~1~|~01/STR~|~Chip sealing SR 542~|~05 - 4R Maintenance - Resurfacing~|~7D125BC1BC4BCAF233BD608DE3147C40FA668330 93507~|~1~|~1~|~01/ENH~|~added plan split info - OKI TE funded~|~~|~91C74DF0D52421A28F86DD90839B81C92D55761B 105222~|~1~|~1~|~01/STR~|~Micro surfacing SR 800~|~05 - 4R Maintenance - Resurfacing~|~EF8CCE19A410952A53CBE65CBA388B8CBBE36DD9 98145~|~1~|~1~|~01/NHS~|~NHS 80/20 Non-BR FRA-315-11.66 under Wilson Bridge Rd~|~13 - Bridge Rehabilitation~|~4A44DA1637CCFAAF4D4F96EAE5CD9DDE94EA0D44 92154~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance funds for 1 year Landscape Maintenance contract~|~31 - Landscaping & Other Scenic Beautification~|~FC3F9AA727398C09BB8C075BFB2B5FC740C25957 95993~|~1~|~1~|~01/IMS~|~Mowing Contract for the East Central Region.~|~44 - Other~|~A16FF85A79A0657417AB009C72CEB9D7A99EC8DD 122007~|~1~|~1~|~01/ERD~|~City of Sunbury, Reconstructing and widening SR 37 (E Granville St) to two 12-foot lanes with a 10 foot SUP on one side. Also includes connecting the Ohio and Erie Trail by removing the old railroad bridge abutments and constructing a new pedestrian bridge over the roadway.~|~04 - Reconstruction - No Added Capacity~|~F938F5D5190D30211C5BE80A9363F859067DDA8C 122007~|~2~|~2~|~02/SAF~|~Safety awarded federal money plan split.~|~04 - Reconstruction - No Added Capacity~|~A67A7E360E335FEC9FE0DA1CC9BC9038CEFCC83E 23730~|~1~|~1~|~01/IMS~|~resurface LUC IR75 7.82-11.86~|~05 - 4R Maintenance - Resurfacing~|~B3B61C4353B9CB56B8205DC33BC3769EE1765EE4 125654~|~1~|~1~|~01/STR~|~Resurface a portion of SR350.~|~05 - 4R Maintenance - Resurfacing~|~BEC837A0A72643CD47089DB75A47D5AF5379F191 116821~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~716343425648A22B15B7BB2793630FA51D2E0810 103439~|~1~|~1~|~01/STR~|~Pavement Split~|~~|~09FF3F8F93A42BD26B298103B93F8CE245568C9A 112189~|~1~|~1~|~01/NFA~|~Plan split for Pedestrian Facility Bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~8E862FC5391D860443C58BA67375D674C20F0BA0 126163~|~1~|~1~|~01/BRF~|~Superstructure replacement of existing bridge over NS RR on Hankins Rd~|~13 - Bridge Rehabilitation~|~DB3CF4C18FE22E65538745D2DF7FA88A3BAD3A95 92040~|~1~|~1~|~01/SAF~|~Add a new westbound to northbound ramp from SR73 to IR75. Retime/Reconfigure signal because the left turn from SR73 is no longer needed.~|~01 - New Construction~|~3B1E72C6CEF99C89D967444994A1CCA1E897C903 111004~|~1~|~1~|~01/IMS~|~Split for bridge work~|~13 - Bridge Rehabilitation~|~1EC9F99B455C7D241C45978009794CC1E5F37D18 87375~|~1~|~1~|~01/CMQ~|~ Project will include access management from the intersection of Meadowlark Drive & Wooster Pike (US-50) to the Mariemont corp. line on Wooster Pike (US-50) including a new access road, closing several driveways, and cul-de-sac'ing of intersecting streets. Improvements along Wooster Pike (US-50) will also include sidewalks, curb and gutter, medians, brick paved crosswalks, decorative lighting, landscaping, signing, and traffic signals. Utility relocation will also be required. Villag of Fairfax~|~21 - Safety~|~BE3118ECB43A64B61ED9D226C4A1DA199B4EBD4D 116082~|~1~|~1~|~01/NFP~|~Districtwide crack sealing.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E7FC4BF45A64FC19F9168C5D3EF9E58F1E449A2C 124392~|~1~|~1~|~01/IMS~|~Repair bridge carrying West St. over IR 70 for damage caused by over height vehicle strike.~|~13 - Bridge Rehabilitation~|~4C6888ED01C199EEF7D86108E9055924F00F2A06 112709~|~1~|~1~|~01/NHS~|~Replace culvert at MAD-38-11.71, MAD-40-5.92, and FAY-734-0.1~|~13 - Bridge Rehabilitation~|~74360AE2DD1302366ED9D0E33871379AC7A475E3 110217~|~2~|~2~|~02/MPO/LAFA~|~All the work designed with ALL Lafayette Sidewalks, PID 110216. Pedestrian facilities. Part of ADA plan. 100% federal funds using MPO-STP funds and Toll Revenue Credt until the cap is reached. Any funds needed over the cap are the responsibility of the Village of Lafayette.~|~28 - Facilities for Pedestrians & Bicycles~|~985080AEC002F5D4C48552D490B9C6B3E978A533 110217~|~1~|~1~|~01/CMQ/BEAV~|~All work in this project. Pedestrian facilities at various location in the Village of Beaverdam. 100% MPO-CMAQ funds with Toll Revenue Credit (TRC) until the cap is reached. Funds needed after the cap is reached to be provided by the Village of Beaverdam.~|~28 - Facilities for Pedestrians & Bicycles~|~5941775D994CE7D960282D125BAB14BF3E6CBA0F 92260~|~1~|~1~|~01/BRO~|~SFN 92260 Replacement of Rockhill Ave Bridge CR15 over mahoning river.~|~10 - Bridge Replacement~|~154554ED24E6823B90424F136D63A87A3E7E0C8F 92260~|~1~|~2~|~02/ENH~|~Construction of eight foot shoulder for trail.~|~28 - Facilities for Pedestrians & Bicycles~|~D7E68D5E1ACBC733D64AFC46589F3563D40ED463 108476~|~1~|~1~|~01/NFA~|~FLAP Plan Split~|~05 - 4R Maintenance - Resurfacing~|~73F8FA2B556B359D4954962ADA8FEAF983EF44A0 108476~|~1~|~2~|~02/NFA~|~ODNR Segment of pavement~|~05 - 4R Maintenance - Resurfacing~|~78A9734DE242ED59F7DE496459D4690ABEFBDDA8 91050~|~1~|~1~|~01/SAE~|~100% Federal using HSIP funds to repair/replace guardrail.~|~21 - Safety~|~37922CE56867DC8F39639BB436FC81460993CF69 123993~|~1~|~1~|~01/SAF~|~Hocking County Route Various Pavement Markings FY2026~|~21 - Safety~|~FF834B7A82541C2A81DE2BE6F8657C9D357B7415 123947~|~1~|~1~|~01/NFA~|~Roadway Minor Rehab with 100% Oil & Shale funds up to State maximum.~|~05 - 4R Maintenance - Resurfacing~|~F81FC4555511C3D88500CAFBC8A527D39AA94AA6 98727~|~1~|~1~|~01/BRO~|~BR funding for the I-71 structure at 90/10 fed/state. However the construction is funded with 100% state bond money.~|~13 - Bridge Rehabilitation~|~7F133752D9195082D7DBDBC15B6BA3DEA8E35B08 98727~|~1~|~2~|~02/IMS~|~IM funding for the I-480 bridge at 90/10 fed/state. However the constuction is funded with 100% state bond money.~|~13 - Bridge Rehabilitation~|~56C2716D983771909F23D2EB23E0FD3CB0D4B288 91445~|~1~|~1~|~01/STR~|~Bridge replacement project. GAL 233 5.95 (SFN 2703157). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~F5914D74471C873E718B905B2FE9C954FA95B7C6 127061~|~1~|~1~|~01/NFP~|~Plan split for crack sealing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C1B7B6A78B41F19AA622D9319938AAE96D75F660 127061~|~1~|~2~|~02/NFA~|~Plan split for ODNR Crack Sealing work~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~595CA46DB1AF55A0E29A4BED88EF36AF00365499 112501~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~0B1E7E2998950541FC2384AE8E83F0107B0D3D8E 112501~|~1~|~1~|~01/S5K~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~C16878D41B03400436E1BA04A58BF3D0DAB142F5 112501~|~1~|~3~|~03/NFP~|~Resurfacing Non-Federal Aid~|~05 - 4R Maintenance - Resurfacing~|~E04EC4B1E5441429092583FD4BB39149C7E40098 105258~|~1~|~1~|~01/STR~|~Resurfacing of BEL-145~|~05 - 4R Maintenance - Resurfacing~|~5774701DD5C9D7523CEA075C34DA7418EBE310CE 100921~|~1~|~1~|~01/SAF~|~Work funded by the Central Office controlled safety program.~|~21 - Safety~|~500F7A32FAA7E9C2FF42A1AE1931ED48042BA7AE 104165~|~1~|~1~|~01/NHS~|~Highway Lighting.~|~21 - Safety~|~3DFF2FD516F672572DA5AEA60118BCC085CC63A5 119025~|~1~|~1~|~01/STR~|~Plan split for bridge work.~|~10 - Bridge Replacement~|~D391773B7DB6BA3B0075F1FFA932A74148EF1147 93595~|~1~|~1~|~01/SAF~|~Improve intersection by widening for southbound dual left turns and a northbound right turn lane.~|~21 - Safety~|~A202751438ADED082339B5F0219F8317093007E8 112476~|~1~|~1~|~01/MPO~|~Split for MPO-funded work~|~~|~5156A6AE9AFF6ED6781682E6BF3DCF2DB456C31F 125768~|~1~|~1~|~01/S>2~|~Plan split for large urban locations~|~13 - Bridge Rehabilitation~|~A16B285553F49ADBA616F4906A755F581D18893E 105597~|~1~|~1~|~01/IMS~|~Deck Sealing~|~47 - Bridge Preventive Maintenance~|~3DBAB0D97DEB74F97C2434B5F8D61A95F7601A8D 102726~|~1~|~1~|~01/IMS~|~Rehab of Interstate bridge. This work also includes an alternate bid for bridge aesthetics.~|~13 - Bridge Rehabilitation~|~8E55323CD82D06A5CFF3BCE37AD53ED157BCD531 113765~|~1~|~1~|~01/BRF~|~All work in the project to replace the bridge. Funding will be 100% from the Municipal Bridge Program until the cap is reached after which the funding will be provided 100% by the Village of Carey.~|~10 - Bridge Replacement~|~C16F6806EF98AB9928C8412915E0A3967020776A 86875~|~1~|~1~|~01/BRO~|~Rehabilitate existing culvert (HOL-62-1835, SFN 3801411) by lining with a liner.~|~10 - Bridge Replacement~|~79D762C56E42F9EC7C42D967CC8ED6742126EA1B 113809~|~1~|~1~|~01/BRF~|~Replacement of SFN 3930610~|~10 - Bridge Replacement~|~13E8EC8E41B4C80FF55B4DEBBB3CBD751E881127 97367~|~1~|~1~|~01/NFP~|~Resurface East 90th Street from Evarts Road to Buckeye Road in the City of Cleveland.~|~05 - 4R Maintenance - Resurfacing~|~9AB8A9905741873CCA03E6E51385AD16468CFC8B 96804~|~1~|~1~|~01/NFA~|~BRO 221 6.80 Slide repair.~|~04 - Reconstruction - No Added Capacity~|~11B106ADA97FE5FD50BB56FFE072EBC6093822FF 105564~|~1~|~1~|~01/S<2~|~Urbanized Area (Columbus) Plan Split: DEL-37-7.47-7.53, 8.36-8.51 & 8.62-8.66 FRA-315-13.56-3.80~|~05 - 4R Maintenance - Resurfacing~|~95FEE4CB428FC741C3D430ED351A87D32A400299 105564~|~1~|~2~|~02/STR~|~Rural Plan Split: DEL-656-0.00-4.69~|~05 - 4R Maintenance - Resurfacing~|~D53282E97F2DC5D867BAA90D42C874A0D3829555 105564~|~1~|~3~|~03/IMS~|~Interstate Plan Split: FRA-70-11.21-11.98 & 13.43-13.95 FRA-270-40.45-41.40~|~05 - 4R Maintenance - Resurfacing~|~C8E90620600E93ABACFB177DCA0CF6F32559A9AE 105564~|~1~|~4~|~04/NHS~|~Priority System NHS Plan Split: FRA-23-0.24-0.51 & 1.50-1.95 FRA-104-8.18-8.79~|~05 - 4R Maintenance - Resurfacing~|~5B202D8A79F22DDD8E5A0C11FFB7B0E112E35C6E 105564~|~1~|~5~|~05/NHS~|~General System NHS Plan Split: FRA-33-12.08-12.61 FRA-62-3.85-5.63 FRA-317-10.06-10.70~|~05 - 4R Maintenance - Resurfacing~|~B573C5787EDFECAC7734A2D4DC3636B6D422CC40 105564~|~1~|~6~|~06/S<2~|~Urbanized Area (Darbydale) Plan Split: FRA-62-0.00-1.63~|~05 - 4R Maintenance - Resurfacing~|~5BB12C4DE4D597F5369FA87D54519274F69095FB 107469~|~1~|~1~|~01/CMQ~|~CMAQ funded Trail pslit~|~28 - Facilities for Pedestrians & Bicycles~|~D6601C0F2DB908212ED0414A2EC7EDED050779A5 101378~|~1~|~2~|~02/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~38C9F2FE21DE3DA27C8A8808ADEE9D5DA2127E34 101378~|~1~|~5~|~05/IMS~|~Concrete deck overlay > 20' span.~|~13 - Bridge Rehabilitation~|~7E083A6C0B7A0B7CC09659489C4F104527DAB2BB 101378~|~1~|~3~|~03/NHS~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~6F6EB1A48CDFC86264F9D67B63AEEC0DCF4AC332 101378~|~1~|~4~|~04/S>2~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~CD4F542507486B2EED79BF0A5036797D9DE489F8 101378~|~1~|~6~|~06/IMS~|~Collision damage repair > 20' span.~|~13 - Bridge Rehabilitation~|~3B7418A5AA360D4A6407AED9CD77D592202C8229 101378~|~1~|~7~|~07/IMS~|~Heat straightening of damaged beams > 20' span.~|~13 - Bridge Rehabilitation~|~820B085A6A6342B042EE531787239E33743935CE 123767~|~1~|~1~|~01/SAF~|~Plan split for traffic signal work~|~21 - Safety~|~54AC73A9D5D2105B436D181CDB07A7851E28A356 89464~|~1~|~1~|~01/IMS~|~IM funding for pavement reconstruction, no added capacity (67% of pavement and roadway costs, for items not specifically identified in other splits).~|~04 - Reconstruction - No Added Capacity~|~F8034508E6D37FD82F2DF4E955D18CF1A93D433F 89464~|~1~|~2~|~02/NHS~|~NH funding for pavement construction, added capacity (33% of pvmt and roadway costs, for items not specifically identified in other splits),~|~~|~8C52525C0BD8DA35B4B1D95ABFD24DF06F648D06 89464~|~1~|~5~|~05/NHS/Cols~|~Incremental items - Columbus to pay the difference above standard items including LA fence, granite cobbles~|~~|~7F61D298C7983EF79AD14AA131974F6C3AF73CBA 89464~|~1~|~3~|~03/IMS~|~IM funding for structure replacement no added capacity (67% of costs except 100% for SFN 2504537 FRA-70 over Short St.)~|~~|~D29D4F75E1FB35EED1CC4D261CA92849B5492D05 89464~|~1~|~4~|~04/NHS~|~"NH funding for structure replacement - added capacity (33% of costs)~|~~|~7EB6B567CDD9DD29AF6973FA4F520D38BFCFDC27 117818~|~1~|~1~|~01/ERD/CIN~|~Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati.~|~21 - Safety~|~DB1E32127599DB3603F2250AAD336BF55CF2E028 117818~|~1~|~2~|~02/NFP~|~Plan split for GCWW funded improvements to watermain along Linn Street between Court Street and Liberty Street.~|~43 - Utilities~|~F1011CEFE536C61A5820453BB9D1A11D8E95A4CC 89428~|~1~|~1~|~01/IMS~|~Lighting Maintenance~|~44 - Other~|~D855A986064AE4DF266CF63FFE19361E755367F3 101130~|~1~|~1~|~01/NHS~|~Various locations in Cities and Villages throughout Lucas and Wood Counties.~|~44 - Other~|~1147C0FEAEF5F8F63D7654B8E1969A100BF26A94 118617~|~1~|~1~|~01/SAE/PCEO~|~Replacement and repair of guardrail~|~21 - Safety~|~C69614249BF2391EFAA84F8E515BB24F22401576 103644~|~1~|~1~|~01/S<2~|~DSR BEL-017~|~~|~ADCC4E155FA5D4BC06997B8C105EBF457A4C0EB6 114875~|~1~|~1~|~01/STR~|~Overlay JAC 93~|~05 - 4R Maintenance - Resurfacing~|~7756F07CC0D14F14187BEBFC37B0E6A63F6A28F2 114875~|~1~|~2~|~02/STR~|~added BR plan split.~|~47 - Bridge Preventive Maintenance~|~B6D2448F901693BF99E7221EB585837CA7C2985E 94666~|~1~|~1~|~01/STR~|~Herbicidal spray at various locations throughout the District. Funding pot = 4CP7.~|~44 - Other~|~523BAC35B4B4377E572F0E5E8EF9332D312283D2 126555~|~1~|~1~|~01/NFP~|~Bridge sealing on various routes~|~47 - Bridge Preventive Maintenance~|~75C9D40918C1874088D99355280D14AB70D64A65 113463~|~1~|~1~|~01/NFA~|~Resurfacing 24.3 miles of couty roads within the boundaries of Wayne National Forest with chip seal treatment. FLAP funded.~|~05 - 4R Maintenance - Resurfacing~|~9BE8929F1EAE21A10F44C7A912D03058336D1562 91107~|~1~|~1~|~01/IMS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~7164E3590B0CB659670DD246A0989BFBB32A79CF 105111~|~1~|~1~|~01/STR~|~HIG 73 0.30 (SFN 3601536) Bridge Replacement.~|~10 - Bridge Replacement~|~96520751A88BE84533C5A51FE154E77EDB64D432 92953~|~1~|~6~|~06/ENH~|~Medina County Waterline.Any betterments and work not required by the project to be replaced.~|~04 - Reconstruction - No Added Capacity~|~CE1DBCA4700CFA764BF748B945082ABE251C991F 92953~|~1~|~7~|~07/ENH~|~Medina City Waterline.Any waterline replacements that are owned by the City, outside of the City; these are not project eligible and will be 100% local cost.~|~04 - Reconstruction - No Added Capacity~|~3F1255D0DE5499FFD0EF8B38F306A9403DFC480F 92953~|~1~|~3~|~03/ENH~|~Non-NHS Added Capacity (60%).Also includes additional turn lanes on River Styx Rd.1st priority: Safety Funds2nd priority: TRAC Funds~|~03 - Reconstruction - Added Capacity~|~F24673239756CEA0C4F0B7498334D5B62C15C8AF 92953~|~1~|~4~|~04/ENH~|~Non-NHS No Added Capacity (40%).Also Includes improvements on Foote Rd. north and south, as well as River Styx Rd.~|~04 - Reconstruction - No Added Capacity~|~BC3476011BB16EC468D5CDEFD5ABA4A68F278F4A 92953~|~1~|~1~|~01/NHS~|~NHS Capacity Added (60%)1st priority: Medina County Commissioners (Medina Co Engineer's Funds, Capped at $100,000)2nd priority: Safety Funds3rd priority: TRAC Funds~|~03 - Reconstruction - Added Capacity~|~3E9466B590D0CF62401D29EE59138AF680FE3E72 92953~|~1~|~5~|~05/SAF~|~Safety Project- Signal WorkAlso Includes extending the proposed SR 18 concrete median from Rustic Hills to the Frontage Rd signal~|~21 - Safety~|~D2E504AE244E054075FD816DC07F14A41BFAFFCE 92953~|~1~|~8~|~08/ENH~|~Enhancement. Multi-use path.Base and pavement, pedestrian bridge, pavement markings and signage. Embankment will be included in splits 1 and 3.~|~28 - Facilities for Pedestrians & Bicycles~|~76B7A67A09BE9C1A9A19718BC03E2290170FFDAE 92953~|~1~|~2~|~02/NHS~|~NHS No Added Capacity (40%).Also includes the north and south frontage roads, which are access management, not added capacity.1st priority: Major 2 Funds Capped at $5,000,000.2nd priority:TRAC Funds~|~04 - Reconstruction - No Added Capacity~|~F600A68F82F439E5B5E9EB6A1F388EAFB3832495 92953~|~1~|~9~|~09/SAF~|~1st Priority Wet Reflective Long Line Markings including Grooving 100% 4HJ7 Capped Safety Funds2nd Priority Delta for Remaining Costs using TRAC Funds~|~21 - Safety~|~53905C897F04CE58D68BD17F63A8E8959B8F4811 92953~|~2~|~10~|~10/ENH~|~Part 2: Non-NHS Added Capacity (60%). Widening and Reconstructing River Styx Rd from Smith Rd to 295 ft South of Smith Rd. New Storm Drainage, Traffic Signals and Signage will be installed.~|~03 - Reconstruction - Added Capacity~|~92BADF9EDC3AAE86E168DACC1632146E54CAA63B 92953~|~2~|~11~|~11/ENH~|~Part 2: Non-NHS No Added Capacity (40%). Widening and Reconstructing River Styx Rd from Smith Rd to 295 ft South of Smith Rd. New Storm Drainage, Traffic Signals and Signage will be installed.~|~04 - Reconstruction - No Added Capacity~|~51A152F903C85CB2708A885802F4D3AB806DF836 125817~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~5D86113F746A44D73EE69DF3CB57EAED76A4B850 117735~|~1~|~1~|~01/NHS~|~Repair of damaged beam and other bridge components resulting from bridge strike.~|~13 - Bridge Rehabilitation~|~BA6684E1341E3D75817471DF355E8E20898A475D 105865~|~1~|~1~|~01/IMS~|~Added plan split.~|~17 - Construction Engineering~|~9191AF3A994F92AC0EB0A16796E6F4690F0723B1 105865~|~1~|~2~|~02/IMS~|~Added CO CO Engr 02 plan split.~|~17 - Construction Engineering~|~EC25BBDF6C486CEB97B3E818412AEC2340C0D424 91303~|~1~|~1~|~01/STR~|~Slide Repair~|~44 - Other~|~E509C27FEEF57577CBF204B5BDB8D4EA87C3BE36 123226~|~1~|~1~|~01/S5K~|~400 ft landslide repair SR 536-1.60mm~|~~|~C038520839B27757B8725C9D50F5C8E15B36398F 106135~|~1~|~1~|~01/NHS~|~Deck replacement > 20 ft span.~|~10 - Bridge Replacement~|~BC4CAF55AA6D15FB7F64EF611C4237B7D9FE3C83 120701~|~1~|~1~|~01/NHS~|~Smoothseal.~|~05 - 4R Maintenance - Resurfacing~|~3A83D7E3FB688D664EE6C5D29DCB6222AB5366FB 125982~|~1~|~1~|~01/STR~|~Plan split for slope repair of SR-582~|~66 - Resilience Improvement - Highway Project ~|~F6B813723A6736D006DEA4E9C631B8AAD707E1FE 125413~|~1~|~1~|~01/STR~|~Resurfacing and related work on SR 229 in Knox County.~|~05 - 4R Maintenance - Resurfacing~|~956AC8C5BF5E8340B65DF7321D448B6DAFBEB3CC 125413~|~1~|~2~|~02/S5K/MVER~|~Resurfacing and related work in the City of Mount Vernon.~|~05 - 4R Maintenance - Resurfacing~|~A3880AE34A74D8322B67D68FC72AB18DE0DA74A4 98138~|~1~|~1~|~01/NHS~|~BRO 52 13.30 to 17.41~|~05 - 4R Maintenance - Resurfacing~|~139C36B3F20778378FD73BA915B94F98A7AFDBE4 113311~|~1~|~1~|~01/MPO~|~work eligible for federal-aide.~|~05 - 4R Maintenance - Resurfacing~|~F022873D0214B9517A205574465E2BADAD7FB641 124933~|~1~|~1~|~01/NHS~|~Plan split for resurfacing roadway on the NHS system~|~05 - 4R Maintenance - Resurfacing~|~45A7E0A0BF45F518691853940A8C3C775D43F814 124933~|~1~|~2~|~02/S>2~|~Plan split for resurface work on Other Federal Aid Urban roadway.~|~05 - 4R Maintenance - Resurfacing~|~C4211A5C49789ECCC2695ED1419CC1F6C666EC00 124933~|~1~|~3~|~03/STR~|~Plan Split for resurfacing work on Other Federal Aid Rural roadway.~|~05 - 4R Maintenance - Resurfacing~|~CD6A87822B25D1B3C8736E7F590BEDD18FC8C142 88680~|~1~|~1~|~01/NFA~|~Smooth seal SR 274 in Logan County.LOG SR 274 SLM 11.00 - 15.78~|~05 - 4R Maintenance - Resurfacing~|~9F54D0C890F38AC350BDA5286A8EB62F0EE11782 111191~|~1~|~1~|~01/NFA~|~Bridge repair/superstructure replacement project. WAS TR 29 0.98. SFN 8433143. Funded 95 Federal/5 Local (15% Credit Bridge).~|~10 - Bridge Replacement~|~32F612D48CA919861910181F1069F1A9816B8197 126893~|~1~|~1~|~01/NFP~|~Plan split for annual traffic signal repair, replacement and installation contract~|~21 - Safety~|~AE4312EFE93E1B8F2E2E6D7606EDDB038369CED8 102365~|~1~|~1~|~01/NFP~|~Split for crack sealing~|~99 - State Preventative Maintenance~|~F02ADEA7A09CA7896F1534B9314420564E6EE050 102351~|~1~|~2~|~02/STR~|~STA SR 93 from 6.39 to 8.82STA SR 183 from 0.68 to 2.09 and 5.88 to 6.47STA SR 241 from 3.78 to 4.16STA SR 619 from 6.69 to 7.36~|~05 - 4R Maintenance - Resurfacing~|~A362C1AD45FD7FE5EAB572C9D44C1A541B472B67 102351~|~1~|~1~|~01/S>2~|~STA SR 93 from 5.84 to 6.39STA SR 241 from 4.16 to 6.01STA SR 619 from 4.66 to 6.69~|~05 - 4R Maintenance - Resurfacing~|~413A39C8EAAAB5D8BD4820527B8CB96058EAD5BD 88836~|~1~|~1~|~01/NHS~|~This funding split is for resurfacing on the NHS system.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~400EAB0BDF1872CEE1BDA52FA5142678E955A657 88503~|~1~|~4~|~04/STR~|~SFNs: 7202695, 7202741, 7202776, 7202806, 7203012.~|~13 - Bridge Rehabilitation~|~161895E76788B1B84AF2BEB967936EA65F80B5E5 88503~|~1~|~3~|~03/STR~|~SAN-412-1.56, @ 3.12 @ 4.70 and @ 5.19.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~67654595FF3D68B02D1D3106E846EB2E294A6A1F 88503~|~1~|~1~|~01/S<2~|~For piece on SR-412 from SLM 0.00 to 0.15~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8BCAB6C8BD023E5DFB1B8B2CA6AFEF7A2C78A8C7 88503~|~1~|~2~|~02/STR~|~SAN SR412 0.15-4.7~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DB2B8147AB6DB5CBA53C7A6D246D6B9291007127 114331~|~1~|~1~|~01/NFP~|~Plan Split for resurfacing within Blue Rock State Forest~|~05 - 4R Maintenance - Resurfacing~|~3E61DB2AFE91B305C46A93B1DBB12F0F81D7050B 109963~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~B2127BC31582B93C17F17B038824E5CA295323EB 109963~|~1~|~2~|~02/S>2~|~Urban Area (STP>200000) Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E30A79F0085AC956612698C9E5DA4BC81C827727 109963~|~1~|~3~|~03/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~D13C64DB99601BDDA6C44B232BCCBC9A8E1BF0AA 109963~|~1~|~4~|~04/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~C4BDBCA23395CF02F1A122C37BF806BC31BD54B8 121912~|~1~|~1~|~01/SAF~|~All work included in this split.~|~21 - Safety~|~07BC2D8DF71BFF4BCD1CFE15F36ABBCDAC7B3D68 86136~|~1~|~1~|~01/STR~|~Preble County culvert replacement project. Replace culverts PRE-121-0246, PRE-121-0373, PRE-121-0567, PRE-732-1142, PRE-732-1276.~|~44 - Other~|~F615317BA71AB983FC538937C4F3A12D58C08590 89233~|~1~|~1~|~01/BRF~|~Brdg ReplacementIt is proposed to replace structure SFN 3632474 SLM 1.26 over Rocky Fork Creek and structure SFN 3632490 SLM 2.84 on Tolle Road, both bridge replacements in Highland county on TR225. Federal Max is $1,26,040.00 per CEAO e-mail dated 03/25/2013. 01/BRF/BR/Highland~|~17 - Construction Engineering~|~E78CAA41A7BD5418ED515273D94D93E7DD95F1FD 102938~|~1~|~1~|~01/IMS~|~Interstate eligible.~|~13 - Bridge Rehabilitation~|~CA5B80170038F8C6CCA7B3D6C503F9F5A9D0E1AC 102938~|~1~|~2~|~02/NHS~|~Plan split for NHS bridges - Luc 2 25.24~|~13 - Bridge Rehabilitation~|~616313B60C6A20FF98C46989B5F3964B0C231786 102938~|~1~|~3~|~03/IMS~|~Major New funded bridge - I75 ove Berdan Ave~|~13 - Bridge Rehabilitation~|~1B76DAF48874C587F72E3AC37EBF411F726F1194 102938~|~2~|~4~|~04/IMS~|~Recessed -wet reflective pavement markings on LUC-75 and LUC-475.~|~21 - Safety~|~5058D85A0FC0D30DC0DB70A7C7DC415B30DE9DD9 90653~|~1~|~1~|~01/SAF~|~Safety project to reconstruct roadway on US-62 from Eakin/Hopkins to Brown Rd~|~21 - Safety~|~11213B1E36B0CEB5BE2EEDA9D804AF0B82D82E76 90653~|~2~|~3~|~03/SAF~|~Storm sewer from Brown Rd to Columbus Storm Sewer System at Mound St~|~44 - Other~|~A0F85B3126217EEFE8D7BFF91C9C483872D62685 90653~|~1~|~2~|~02/ENH~|~MORPC Enhancement and FRA County local funds for bicycle and pedestrian facilities only~|~21 - Safety~|~6CD1DF4771A99ECC72C3ABC739704191C22F7220 106624~|~1~|~1~|~01/IMS~|~Plans split for Luc-280-4.61 SB Drive lane overlay~|~13 - Bridge Rehabilitation~|~21315D07FB0A3F33BA57A07AB35CBA85D3BB4BAC 106102~|~1~|~1~|~01/S<2~|~Urban Paving Plan Split: MAR-309D-0.00-0.34 MAR-423D-1.37-1.43 MAR-423-7.66-8.50 MAR-529-0.00-0.46~|~05 - 4R Maintenance - Resurfacing~|~2600713312FE2B1F4C26091E341950EE0D381474 106102~|~1~|~2~|~02/S<2~|~Urban Area Plan Split: MAR-529-0.46-2.59~|~05 - 4R Maintenance - Resurfacing~|~05F72D02C27D949A4484DDCD757036CF9B1371BC 106102~|~1~|~3~|~03/S<2~|~Non Urban Paving items and Items to be paid 100% by the City of Marion~|~05 - 4R Maintenance - Resurfacing~|~8AC13D47806CE4F239B98379BD65BF859FE11A5D 118715~|~1~|~1~|~01/S>2~|~Superstructure replacement, includes resurfacing before and after bridge.~|~13 - Bridge Rehabilitation~|~BB0B2048EB9D0AB76213D64A181A4DC930E19DFD 115000~|~1~|~1~|~01/NFP~|~Traffic Signal Upgrades.~|~21 - Safety~|~6F66F2267CA0D7C70DFCF3BBD25624062854A0A6 99761~|~1~|~1~|~01/S<2~|~Slide repair on LAW-7-0.58~|~04 - Reconstruction - No Added Capacity~|~946E0359AC864E306DB9175842CEC855036D27A9 94106~|~1~|~1~|~01/CMQ~|~Construction of a compressed natural gas (CNG) station on property adjacent to the southern border of the City of Hamilton's municipal garage located at 2210 S. Erie Highway. The City of Hamilton is currently acquiring this parcel, which will also be utilized for employee parking.~|~01 - New Construction~|~6CE32F42DDE4E8A2C1950A2C9D49419B6B2D7ACA 99072~|~1~|~1~|~01/IMS~|~A contract to operate 3 moveable bridges; perform necessary related work.~|~44 - Other~|~FA2E7B99E72CF3027A6452C7FC8760CED7AE7E96 123205~|~1~|~1~|~01/NFP~|~ITS maintenance of various devices and infrastructure.~|~44 - Other~|~338700132A60B793CA88021958CAE5B04FAF29C0 124439~|~1~|~1~|~01/NFA~|~Created for ODOT TID involvement~|~~|~28BCA67FF95173556B86000931704F26DD8994AF 98691~|~1~|~1~|~01/NFA~|~Resurfacing project on WAS CR 10 0.00-1.69. Not on any federal aid system funded 80% federal (WWW/4TA7)/20% local.~|~05 - 4R Maintenance - Resurfacing~|~278C8CFC390F7A0D749EBE6DC505EAAFBF65C95D 96656~|~1~|~1~|~01/IMS~|~Resurfacing on WAR-71~|~05 - 4R Maintenance - Resurfacing~|~21B0C08CEDCF881AF762F8A8B19C3375A16A5ABC 113985~|~1~|~1~|~01/SAF~|~Recessed wet reflective pavement markings~|~21 - Safety~|~EC3881ED9A7E059AEDF272CA421EBAC96B9832F7 117231~|~1~|~1~|~01/SAF~|~Safety widening~|~21 - Safety~|~855BA2152BC5640145EA6391EC68CB734865D4DA 101575~|~1~|~1~|~01/S>2~|~Widening of southbound SR-4 to provide an additional lane exclusively for traffic heading to the WB IR-275 on-ramp. Improvements include grading, drainage improvements, modification of the WB IR-275 off-ramp signal, modifications to pavement markings, and installation of new signage (overhead and ground-mounted).~|~21 - Safety~|~33DE8B153ACCAD8B65805E6057C681C02EAD3035 123213~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. MRG 555 0.00-3.274, MRG 676 0.00-0.315, WAS 555 7.707-19.412 and WAS 676 4.299-4.777.~|~05 - 4R Maintenance - Resurfacing~|~EF9B47FF97E4EE132A79DD90EB637F43A76C0E32 123213~|~1~|~2~|~02/NFA~|~Resurfacing project using an asphalt overlay treatment. WAS 676 0.00-4.299. Not on the federal aid system.~|~05 - 4R Maintenance - Resurfacing~|~5A2968264BB816B3A8D1A9F49A04891B398B2374 87716~|~1~|~2~|~02/IMS~|~Structure work for Interstate Bridges.~|~13 - Bridge Rehabilitation~|~1790FB575650078AA9ABCCBA73AF57492D18B424 87716~|~1~|~3~|~03/NHS~|~Structure work for NHS Bridges~|~13 - Bridge Rehabilitation~|~0B3CE8AFEEFA5067F67B2D5E8ED3AAAAF8E6A8EB 87716~|~1~|~1~|~01/IMS~|~RESURFACING:MED-IR-71-06.66 TO 09.21 (60)AC OVERLAY W/RPRMED-IR-76-00.00 TO 00.73 (60)AC OVERLAY W/RPR~|~05 - 4R Maintenance - Resurfacing~|~472F2886F4239A896DB0CAAA154218B4226EB238 87716~|~1~|~4~|~04/SAF~|~Split 4/1 is Delta for wet reflective optics and grooving for the pavement markings (100% 4HJ7) and split 4/2 to cover the remaining costs (4PF7/4PS7)~|~21 - Safety~|~6A26ED3E29971BE666B43D6FD168AC8868F6CF35 87716~|~1~|~5~|~05/IMS~|~Vehicle Fire on Bridge damaging the parapet and protective epoxy urethane sealing.~|~05 - 4R Maintenance - Resurfacing~|~FA8F82932486EFFE9F998552E336F70386213AE3 9670~|~1~|~1~|~01/S>2~|~Plan split for al work on this project. Unfunded at this time.~|~~|~161A2D8A92F4FEBBBEDBF1546D7FA53D88B8E8FA 111361~|~1~|~1~|~01/NFP~|~ODNR project to resurface roads R-5, R-4, R-2, R-3, F-3, F-2, F-4 in Strouds Run State Park. Funded 100% State.~|~~|~FA3BD9E23BBC6E47BC9CD9179FD1BBC489CC1DF1 117916~|~1~|~1~|~01/NFA~|~NEVI Phase 1 I-75-C~|~~|~82DC3067B4C25740215CFF58AC848C00DFD86D77 124442~|~1~|~1~|~01/S>2~|~Plan split for federally eligible construction items~|~10 - Bridge Replacement~|~ECF27CD98810649AE7B189560EBC03EDFCE307DF 116681~|~1~|~1~|~01/STR~|~On SR 81 in Hardin County from the Allen County Line to US 68, not including the village of ADA~|~05 - 4R Maintenance - Resurfacing~|~815FC340AFE69972B9992278F8FAB37E2346203B 116681~|~1~|~2~|~02/S5K~|~Resurfacing on SR 81 within the 5,000 - 49,999 urban area near the Village of Ada. SLM 1.97 to 2.26 and 3.98 to 4.02.~|~05 - 4R Maintenance - Resurfacing~|~9EA934B7212EFAB5E9526673BDDB7B93E8717E1F 100795~|~1~|~1~|~01/IMS~|~Overaly IR 675 in Montgomery County MOT IR 675 SLM 0.00 to 4.11~|~05 - 4R Maintenance - Resurfacing~|~1B8355EF20893E5D45E21B864399623151CF13D5 94218~|~1~|~1~|~01/NFP~|~District wide pavement marking and raised pavement marking contract for FY2018. Locations to be determined.~|~21 - Safety~|~D5B15507FD047A7F0BECB592D04F21C42BE18EB1 91742~|~1~|~1~|~01/NFA~|~Resurfacing project using a fine graded polymer treatment. MEG SR 143 8.25-19.36. Non-Federal aid route, 100% State funds.~|~05 - 4R Maintenance - Resurfacing~|~D85598B0549AA5736BEB90628A099F3AEDC15C86 91742~|~1~|~2~|~02/S<2~|~Resurfacing project using a fine graded polymer treatment on MEG SR 124 36.88-42.02, 57.15-62.33. 80% Federal and 20% State on Major Collector, Federal Aid System.~|~05 - 4R Maintenance - Resurfacing~|~310857C5271801F350F9F17CBD876D0E0575E45A 88647~|~1~|~1~|~01/IMS~|~Interstate resurfacing plan split~|~05 - 4R Maintenance - Resurfacing~|~589740768B1A3C1214E0B57C9E384A553A72A3BC 96388~|~2~|~2~|~02/S<2~|~Sidewalk and crossing improvements including ADA curb ramps. Solar poered school zone flasher assemblies for Urbana Junior/Senior High School. CR500 0.930 to 1.540~|~21 - Safety~|~1CA839A96994559E727E305090A480468C0F1A02 96388~|~1~|~1~|~01/SAF~|~Construct sidewalk and crossing improvements including ADA curb ramps TR126 3.210 to 5.210~|~21 - Safety~|~345745D7D77F6CD7AD31D6345A0E7D3973F32A1A 110083~|~1~|~1~|~01/SAF~|~Auxiliary pavement marking project throughout the District~|~21 - Safety~|~15AFF1DDB0167714563B103756B8180B4D444F56 114275~|~1~|~1~|~01/IMS~|~Mowing contract in District 8~|~44 - Other~|~65EF6426A19B247461C35D4560CA5F93F04D50DB 94020~|~1~|~1~|~01/BRF~|~Bridge replacement of Keowee Street Bridge SFN 5760550~|~10 - Bridge Replacement~|~8A52779C76A1A7074751324F40460355A58E7E09 94020~|~1~|~2~|~02/BRF~|~Non federal eligible construction costs for Keowee Street Bridge replacement~|~10 - Bridge Replacement~|~04198CD343DF955BB0678340CFBA79ED0A70883E 94020~|~1~|~3~|~03/BRF~|~Non-Federal costs associated to Keowee Street Bridge replacement~|~~|~8DD6243C3DEF3E18E0EC8BE0F2C3BC03510AD66D 120071~|~1~|~1~|~01/NFA~|~NEVI Round 2 76-A~|~63 - Electric Vehicles & Charging Infrastructure~|~47909E2C980C5FA7449EB7D66557F63BD7B1FB25 91736~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project using an asphalt overlay treatment. HOC US 33 4.21-9.48. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~EA600DA7E708F4399B254023076D24758F630C3E 91736~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. HOC 93 12.30-13.07, City of Logan urban paving. Funded 80 federal/20 local.~|~05 - 4R Maintenance - Resurfacing~|~6B935517F8F828C376FA2E9F0FA6AF8CA3965DA0 91736~|~1~|~3~|~03/NFA~|~Install ADA curb ramps in the City of Logan.~|~05 - 4R Maintenance - Resurfacing~|~0AA3F56A563643CA93BA4C798550483203CE83F1 91736~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~82E9F624C0F23B0BB39D4CC22A4683395D8A3CDB 110707~|~1~|~1~|~01/NFA~|~Construct new sidewalks along Betscher Avenue between East 4th Street and Stadium Drive and along East 7th Street between Betscher Avenue & North Crater Avenue.~|~21 - Safety~|~66E9699DB98046C4E9D5A5A56042E63EADC2A319 116704~|~1~|~2~|~02/BRO~|~add plan split for additional bridge decks to receive SS-856 Waterproofing ~|~47 - Bridge Preventive Maintenance~|~3FB7F54391B3E15BD876263E68B542B90FC31DFD 116704~|~1~|~1~|~01/IMS~|~For Resurfacing on IR 75 in Allen County from SLM 5.53 to 9.85~|~05 - 4R Maintenance - Resurfacing~|~4855042249F61CD8304618E324E2812F472911D3 101361~|~1~|~1~|~01/IMS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~6186C01D2BA76C417C2ABDF4076615C5B51BB17B 101361~|~1~|~2~|~02/NHS~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~7371167A37C868EE5F4B6EFEC32F909DC5ADE8A3 101361~|~1~|~3~|~03/S<2~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~D5A17AF6AF17A06C37C73FA92CEEC10490405063 101361~|~1~|~4~|~04/STR~|~Bridge cleaning.~|~13 - Bridge Rehabilitation~|~0073DD7A14D1919569095D64FB7F6C4D83047ED7 109247~|~1~|~1~|~01/NFP~|~2019 Operations Chip Seals~|~05 - 4R Maintenance - Resurfacing~|~D8760BAEF50425266653D0D00040A75C44896F03 101218~|~1~|~1~|~01/NFP~|~District Maintenance Operational Funds - 4CP7 (100% State) - See CAP Comments - District wide mowing project along Interstates and Interstate Look-a-Likes~|~44 - Other~|~CC8F7972793B23A638BE586ACE14D4A291DC25C9 101190~|~1~|~1~|~01/STR~|~Chip seal~|~05 - 4R Maintenance - Resurfacing~|~BE930EF7FDDA0994983464151F87AA19ADFDDBC1 101190~|~1~|~2~|~02/NFA~|~Chip Seal~|~05 - 4R Maintenance - Resurfacing~|~4659D3D44B98A264EC81251A71CA1B8104C3D19D 104513~|~1~|~1~|~01/ENH~|~Resurfacing for Holmes County Park District 95% Federal TAP funds with 5% Local Match.~|~28 - Facilities for Pedestrians & Bicycles~|~304FE34565B50FFAF3FCA8F2DBC67869A9E329DB 120360~|~1~|~1~|~01/NFP~|~2-Year districtwide lighting maintenance and repair. Includes LED upgrades.~|~21 - Safety~|~77C6A6E97A4DF6DB9535EFE6067A62A5B0EEE2CD 110337~|~1~|~1~|~01/MPO~|~STP Pavement Work on CR 7 (Strub Road)~|~05 - 4R Maintenance - Resurfacing~|~4E41B2CEEE5840BCC2DB2FC49A3149288CD14686 110337~|~1~|~2~|~02/MPO~|~TA - Sidewalk on Strub Road~|~28 - Facilities for Pedestrians & Bicycles~|~B1F1619F55106252A4E0C6E303256DE49CAB2574 110337~|~1~|~3~|~03/NHS~|~Turn lane~|~01 - New Construction~|~78C97D9EEC55D08501A5E8C801A40C364D29CC13 92011~|~1~|~1~|~01/NHS~|~JAC 35 11.24-19.00~|~05 - 4R Maintenance - Resurfacing~|~3E755A7C2DF1523F4F689C3AAC04028F0A3E8146 92011~|~1~|~2~|~02/NHS~|~4000315 JAC 35 11.464000323 JAC 35 11.474000374 JAC 35 12.164000382 JAC 35 12.164000404 JAC 35 12.284000412 JAC 35 12.284000463 JAC 35 12.944000471 JAC 35 12.944000420 JAC 35 13.654000455 JAC 35 13.654000544 JAC 35 14.794000579 JAC 35 18.914000609 JAC 35 18.92~|~47 - Bridge Preventive Maintenance~|~6FB7C22D9772FC45C544333496E055705BA15410 120382~|~1~|~1~|~01/STR~|~Plan Split 01/STR/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F1D34D41725748523A4EE5E115DC9813FCE0F574 114407~|~1~|~1~|~01/S<2/LANC~|~City of Lancaster Large City Funds with Toll Revenue Credit - 4TA7 (80% Federal) / LNTP (TRC 15% Local ) / LNTP (5% Local) - See CAP Comment -Project for resurfacing and related work on Sixth Avenue in the City of Lancaster.~|~05 - 4R Maintenance - Resurfacing~|~6832D609DB64174B983AA6AFA18BB416BA7BF86B 87147~|~1~|~1~|~01/NHS~|~Four-Lane resurfacing project. MOE 7 8.65-11.45 and 21.13-22.73 4LN use Mill/Fill treatment. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~49AB564B178535BA90C9BA6356467C13F6A84062 103683~|~1~|~1~|~01/STR~|~Landslide repair on ATH CR 25 7.95, DSR ATH-008. Federal ER funds 80% and 20% Local.~|~17 - Construction Engineering~|~1462D51DA1EC4A8EF7408695CF959A0A87399EEE 119401~|~1~|~1~|~01/NHS~|~Pedestrian Improvements~|~28 - Facilities for Pedestrians & Bicycles~|~3C72D6FB36726279E6482F72C33C4DA7046B5FAE 117087~|~1~|~1~|~01/NFA~|~D09 HS FY2026~|~31 - Landscaping & Other Scenic Beautification~|~CA22E2141BD25E8BFF68085422A76A02E609D0A3 87151~|~1~|~4~|~04/NHS~|~NHS funds frm the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. No local funds. All work on US 33.~|~05 - 4R Maintenance - Resurfacing~|~F7734E64D03CD08ABBD9553D79C5D824DE6EEC3C 87151~|~1~|~1~|~01/STR~|~Rural STP funds from the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. No local funds. SR 118 from the County line at 0.00 to the Van Wert Urban Area boundary. The UA boundary is at 7.73 which is where SR 118 enters the City of Van Wert on the left side of the road. All work on SR 49 and SR 81.~|~05 - 4R Maintenance - Resurfacing~|~F8ADDAF5D9BE3A0FFBD6FD86EF47CC95165C41B0 87151~|~1~|~5~|~05/NFP/VAN~|~Items paid 100% by the City of Van Wert.~|~05 - 4R Maintenance - Resurfacing~|~CAB386F9A3040052EAB4179C7B591A8CDF952DBB 87151~|~1~|~2~|~02/S<2/VAN~|~Urban STP funds from the District Preservation Program budget with the City of Van Wert providing funds for the 20% match. 80% SAC 4PF7and 20% SAC 4BG7. All work in the City of Van Wert. All work on US 127. Work on SR 116 from 18.70 to 19.06, 19.10 to 19.20 and 19.28 to US 127 at 19.73. Work on SR 118 on the left side starting at the Van Wert Urban Boundary/Corporation Limits at 7.73 to 8.69 on the right side from 7.75 to 7.89 and 8.26 to 8.42. On SR 118 on both sides of the road from 8.69 to Ervin Road. Work on US 224 on the right side of the road from Liberty Union Road (CR 77) (9.26) to the City of Van Wert corporation limits at 9.33.~|~05 - 4R Maintenance - Resurfacing~|~137D3EEB290CF01BB73BE2CD1E6959B4ADB11661 87151~|~1~|~3~|~03/S<2~|~Urban STP funds from the District Preservation Program budget. 80% SAC 4PF7 and 20% SAC 4PS7. No local funds. Work inside the Van Wert Urban Area but outside the City of Van Wert. Work on SR 116 from Middle Point Road (18.15) to the corportation limits of the City of Van Wert (18.70) and on SR 116 from 19.06 to 19.10 and 19.20 to 19.28. Work on SR 118 on the right side from 7.73 to 7.75 and 7.89 to 8.26 and 8.42 to 8.69. Work on US 224 on the left side of the road from Liberty Union Road (CR 77)(9.26) to the City of Van Wert corporation limits at 9.33 when on both sides of US 224 to the end of the work at the CSX RR at 11.44.~|~05 - 4R Maintenance - Resurfacing~|~43DA3DC3118E4F303115582E0F6125B07DFE1190 98583~|~1~|~1~|~01/SAF~|~Project includes replacing existing pavement markings with new thermoplastic pavement markings on various county roads in Butler County.~|~21 - Safety~|~AD81F89E5A7EF3BA6D21E202BA4A8C3A400764E0 116316~|~1~|~1~|~01/NFP~|~Plan split for mowing along various routes in Franklin County.~|~44 - Other~|~02864A8C5F83372A1D296F39E2106E53770C4EBB 113709~|~1~|~1~|~01/SAF~|~Rebuild the traffic signal at SR-48 & Corwin Nixon Rd with backplates, pedestrian accommodations, supplementary near-side signal heads and a concrete refuge island.~|~21 - Safety~|~CD7A312DC600876BDDCD2330B42951081B53A246 98473~|~1~|~1~|~01/STR~|~LOR-57-4.87-6.43 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6418529B6835C61F89ACAE72FE1C920E34801FF7 98473~|~1~|~2~|~02/S<2~|~LOR-57-6.43-8.95 Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B6B784C04C9426D79B284AE1F4038B229688C0FD 107821~|~1~|~1~|~01/STR~|~MAR-95-15.33 to 19.73 and all bridges not itemized in Bridge Plan Split.~|~05 - 4R Maintenance - Resurfacing~|~A8DF4E83B681BE866DB7965F41B3B7DB85B279FF 107821~|~1~|~2~|~02/STR~|~MRW-95-19.71 Bridge, SFN: 5902371~|~47 - Bridge Preventive Maintenance~|~677544DD4DE56D8E67647F7EA1357355EA7CB25F 107821~|~1~|~3~|~03/STR~|~MRW-95-16.98 bridge, SFN: 5902282~|~47 - Bridge Preventive Maintenance~|~CCDC0733B63A21EB9636EDF2A1BAA7B0AE4E676C 107821~|~1~|~4~|~04/SAF~|~MRW-95-15.33 to 16.67 - Installation of Item 618 - CL Rumble Stripes and Item 874 - LJ Prep~|~21 - Safety~|~026250857526FA731AFA3765EDFD033B08686823 110908~|~1~|~1~|~01/SAF~|~Work to improve pedestrian crosswalk that is eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~F92DF0164AD383FBA93552F344A6170BFAAD97F8 102958~|~1~|~1~|~01/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~23C0064F34825C781CAAA89A3DCA67E1B97991A1 102958~|~1~|~2~|~02/NHS~|~This plan split is for the NHS route.~|~05 - 4R Maintenance - Resurfacing~|~4731722304984B594C33C972E424EAA379331D22 94201~|~1~|~1~|~01/STR~|~Plan Split for the Rural portions of the project.~|~99 - State Preventative Maintenance~|~4AAB689DD455B1EE99FE3C0D85E8C9920AEAC4CC 94201~|~1~|~2~|~02/S>2~|~Plan split for the Urban portion of the project.~|~99 - State Preventative Maintenance~|~786780707E1EA654BBD9E025487EB89E8510410D 94201~|~1~|~3~|~03/NHS~|~Plan split for the NHS portion of the project.~|~99 - State Preventative Maintenance~|~82DAB92D48F2536E2FA97DF9F4A54D0C79A668AD 94201~|~1~|~4~|~04/S<2~|~Plan split for the Small Urban portion of the project.~|~99 - State Preventative Maintenance~|~D3BAEC0F321B01B0B8D81D9288222D1E98396B3F 88349~|~1~|~1~|~01/SAE~|~Safe Route to School funding - Eligible for 100% federal funding.~|~44 - Other~|~24166F7E585024C8A1AA2586210CED304BB373C8 105521~|~1~|~1~|~01/IMS~|~Opening in median wall for safety vehicles on Interstate 75~|~21 - Safety~|~E8419FABA33A79849DA3A7C5830AEBAA86997E99 118624~|~1~|~1~|~01/NHS~|~Established PLan Split 01/NHS/PV~|~05 - 4R Maintenance - Resurfacing~|~2F05110F7BB86B4F131FA52F0ED45806D95CA3CE 107865~|~1~|~1~|~01/SAF~|~District Wide Traffic Upgrades-Various Signs, Lighting, Signals.~|~~|~03A2B5AFEF085FD3B29C3366AB67282303F00E87 108342~|~1~|~1~|~01/NFP~|~Asbestos abatement and building demolition of the Hertz/Byers property~|~44 - Other~|~73FB9A4DC43091C7219BB3EA346CF17CC8409B24 87029~|~1~|~1~|~01/SAF~|~Project for systematic sign upgrades in villages and other missed areas that need upgrading.~|~21 - Safety~|~B9E9825917CC7DFFFB76FC4EBD554861BB41EF5B 92791~|~1~|~2~|~02/S<2/LAW~|~LAW CR1 & CR4 Resurfacing ProjectUrban Portion LAW CR 1 0.00 - 12.04 (12.04 miles)80 Fed/20 Local Match by Law. Co.~|~05 - 4R Maintenance - Resurfacing~|~29A8D65511213BBABF3B189339F666A758E7B22D 92791~|~1~|~1~|~01/STR/LAW~|~LAW CR 1 & 4 Resurfacing Rural Portion LAW-CR-4 5.00 to 13.11 (8.11 mile)80 Fed/20 Local match by Lawrence County CEAO ~|~05 - 4R Maintenance - Resurfacing~|~30FFB4455407B4A6E64349C7A6369772DCD3F5B0 100179~|~1~|~2~|~02/STR~|~Landslide repair project. MOE 536 7.30, DSR MOE-002. ER Funded, 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5861EF87CAE00CEF413B610FAC5B906F85EF484E 100179~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 7.20, DSR MOE-005. ER Funded, 80% Federal and 20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E7CE8973E686013326FE671A27BD2765E077A280 108313~|~1~|~1~|~01/STR~|~Slide repair from OH18-01 ER Event. DSR# BEL-024.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~6AE01FCF6D4F54057A2B2FD0A355E136A9250420 114067~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction expenses~|~21 - Safety~|~847AC3624ED954AE05D3D09F5A03642DBB9629D3 93683~|~1~|~2~|~02/NHS~|~This split is for resurfacing work outside of the City of Findlay but inside the Findlay Urban Area. It covers work on US224 from 17.16 (east corporation limit of Findlay) to 17.40. It also covers work along the south side of US224 from 16.22 to 16.28 and along the north side from 16.91-16.95.~|~05 - 4R Maintenance - Resurfacing~|~0887FD745723A41B62B66A174650ED474DE1BDB2 93683~|~1~|~4~|~04/S<2/FIND~|~All resurfacing work on SR 568 inside the City of Findlay. From Beech Ave. (0.23) to East St. (0.32). 80% federal funds from the District Preservation Program budget SAC 4PS7 and 20% local funds from the City of Findlay SAC 4BG7.~|~05 - 4R Maintenance - Resurfacing~|~90D332B7918DAC724CEEAA1855E3CC80DCEC8AC0 93683~|~1~|~3~|~03/NHS/FIND~|~100% City items to paid by Findlay. Curb ramps, full and partial depth repair and aux. pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~E7C858C5CB00CE8489A178632D078C42487B012C 93683~|~1~|~1~|~01/NHS/FIND~|~All resurfacing on US224 inside the City of Findlay. From the intersection of Trenton Ave. and N. Main St.(12.76) to the eastern corportation limits (17.16) excluding the portions of US224 which are outside the corporation limits: 16.22-16.28 on the south side and 16.91-16.95 on the north side of US224, 80% federal funds from the District Preservation Program budget SAC 4PF7, and 20% local funds from the City of Findlay SAC 4BG7.~|~05 - 4R Maintenance - Resurfacing~|~FA958B6197186A40CC0EED390FB0B48F64B177C0 92506~|~1~|~1~|~01/BRO~|~Bridge Replacement~|~10 - Bridge Replacement~|~6493654908060B02CD3E25555D90EE169DEDE362 124457~|~1~|~1~|~01/NFP~|~Created for TID Involvement. ~|~~|~78756CF113AA993ABB78A8ABCEB0DF3C8DA8D203 95448~|~1~|~1~|~01/SAE~|~Guardrail terminal end upgrade throughout District 4.~|~21 - Safety~|~939A0A24905AEB9403A9FAD1B99D3CF884C2A900 115639~|~1~|~1~|~01/S5K~|~Bridge replacement project. HOC 664 16.52, SFN 3704742.~|~04 - Reconstruction - No Added Capacity~|~91AB4C186C20AAE33612151BD283AF6C466E4C58 117044~|~1~|~1~|~01/STR~|~WAY SR 0094 14.443 to 18.16 Full Depth Reclamation ~|~04 - Reconstruction - No Added Capacity~|~7AFE5732921E11BB39AB0539AD46D57EAFC72432 88856~|~1~|~1~|~01/STR~|~Bridge Superstructure Rehab HUR-99-5.82 - Part 1~|~13 - Bridge Rehabilitation~|~3E900C56A106A7163C331D479E4EDEBB03A7E1D1 88856~|~1~|~2~|~02/STR~|~Culvert Replacement HUR-99-10.46 - Part 2 Task Order.~|~04 - Reconstruction - No Added Capacity~|~94F28CEA072AB19066B0588D7D49073F1F86A505 121676~|~1~|~1~|~01/IMS~|~Reactive Maintenance LOR-90-10.76 to 18.60~|~05 - 4R Maintenance - Resurfacing~|~C22CDDC105169A5CA963B4ACF1C1E38828EDD018 115179~|~1~|~1~|~01/S>2~|~Franklin County. SR 161 (from Answorth Dr to Strathaven Dr) and Linworth Road~|~21 - Safety~|~C2401FE4777756FA447AE35079E1D68E75732C00 115179~|~2~|~2~|~02/SAE~|~Safety Improvements at SR 161/Bellbrook Place intersection including sidewalks, crosswalks, RRFB.~|~21 - Safety~|~6CCF61BD0E9DC6B5A0EC395D1387564325876A70 114713~|~1~|~1~|~01/NHS~|~Noise wall construction.~|~04 - Reconstruction - No Added Capacity~|~5D3AAD4F757A68A9D51B21540031DD58CAA97128 105627~|~1~|~1~|~01/STR~|~Rural plan split~|~05 - 4R Maintenance - Resurfacing~|~2329B518E047E41BD4E766D5B7A475326446C670 105627~|~1~|~2~|~02/S>2~|~Urbanized Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~0C45B504AB5235960D752B487B98DA20F2F3F6AC 106441~|~1~|~1~|~01/SAF~|~Widen SR31 from 4 to 5 lanes, new WB slip ramp and signal installation.~|~21 - Safety~|~4AA551A464E963098A48299B5F143BEF61DDC6B5 106441~|~1~|~2~|~02/NFA~|~Extension of Northwoods Drive including lighting, waterline, sanitary and roundabout at Mill Rd intersection~|~21 - Safety~|~715604A78A655547259A20D15C652AF16C80DC64 83816~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. ATH 329 0.00-12.19, 13.66-14.60. 80/20% Federal/State.~|~05 - 4R Maintenance - Resurfacing~|~27D50596EF4F6497203DC5885CDE0F8BFC78BFCE 83816~|~1~|~2~|~02/SAF~|~Curve widening with minor realignment on HOC SR 93 2.04-2.34. Federal Safety 90%/State Safety 10%.~|~07 - 4R Maintenance - Relocation~|~8BD257CFB69ECD99FDE644DC122A0AEE05E4645E 125027~|~1~|~1~|~01/IMS~|~Addition of a through lane in each direction and reconstruction of existing lanes~|~03 - Reconstruction - Added Capacity~|~ADFFC3784DD0AB64831193A859D89A8B0CC56C12 124417~|~1~|~1~|~01/NFP~|~Created for J&C TID Involvement~|~~|~2E5052E36AE6F665BB9899FD6D3FB2F7C3ABC7B6 116385~|~1~|~1~|~01/NHS~|~COL-11~|~05 - 4R Maintenance - Resurfacing~|~061DC0668A4F27E3CF99850AF85703C664A3104A 125357~|~1~|~1~|~01/S5K~|~Smoothseal.~|~05 - 4R Maintenance - Resurfacing~|~E029D5CC50E0587B89A794492C08EE4BF28BC323 122509~|~1~|~1~|~01/IMS~|~Guardrail repair on various routes~|~21 - Safety~|~1DB0B558BDE79565180FF38B3B49929777359B3E 124122~|~1~|~1~|~01/NFP~|~Plan split for bridge operations~|~40 - Special Bridge~|~94544245ED045F304F7B9C8CDC8A3D64D8F5A1A3 110128~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~9C789436AC5CE52CE9E53167A332AF56854D5093 108131~|~1~|~1~|~01/CMQ~|~Intersection improvement at Cleveland-Massillon Rd and Ridgewood Rd.~|~21 - Safety~|~19A8E32FE06C61D811A0DC890FBC2A455C18E6D7 83057~|~1~|~2~|~02/NFA~|~Resurface SR286 0.00 to 1.36Brdg is a pave thru.3603709 HIG SR286 0.36 Intersect: Indian Run100% state 02/NFA/PV/State~|~05 - 4R Maintenance - Resurfacing~|~16F5B2302F58E262A3CE40CA4042517ECF7FC8FC 83057~|~1~|~1~|~01/STR~|~Resurface HIG SR136 0.00 to 7.21 All brdgs are pave thru. 3602818 HIG SR136 0.05 Intersect: Branch Of Ohio Brush Crk3602826 HIG SR136 0.09 Intersect: Stream3602834 HIG SR136 1.64 Intersect: Oak Run3602850 HIG SR136 2.8 Intersect: Br Of Ohio Brush Creek3602885 HIG SR136 4.92 Intersect: Br East Fk White Oak Crk3602915 HIG SR136 6.36 Intersect: Sugar Run80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~C743B4105635EF57727BC9623194441FF12BD5A9 107246~|~1~|~3~|~03/NHS~|~Minor bridge rehab.~|~47 - Bridge Preventive Maintenance~|~76C4E803D6462B1F9C3212E577E73F4D7809FFCD 107246~|~1~|~2~|~02/IMS~|~Minor bridge rehab.~|~47 - Bridge Preventive Maintenance~|~004641D7B58440F109DA62455963C7213293C2F1 107246~|~1~|~4~|~04/S>2~|~Minor bridge rehab.~|~47 - Bridge Preventive Maintenance~|~E1E98FA76DCA55171CBB3732AFFEF7BB2BB886E7 107246~|~1~|~6~|~06/STR~|~Minor bridge rehab.~|~47 - Bridge Preventive Maintenance~|~611F145812092004BCD2C4B587DBE29CA7FC12C2 107246~|~1~|~7~|~07/IMS~|~Bridge hit repairs including heat straightening or remove and replace portion of beam.~|~13 - Bridge Rehabilitation~|~B36E2FFFD5EED3C3E7E57858181617428ACC0490 107246~|~1~|~5~|~05/S5K~|~Minor bridge work.~|~47 - Bridge Preventive Maintenance~|~72D78C50FA52FBBD5F2A7F718EDA9C859703F049 107246~|~1~|~1~|~01/IMS~|~Removal of an abandoned railroad bridge.~|~40 - Special Bridge~|~6AA620E423D3D2E519C61A713BA6488DE5D5BAEF 24130~|~1~|~2~|~02/S<2~|~100% City of Medina items - Traffic Signal & Pavement Fabric~|~21 - Safety~|~152C68CAD18C2F8711DC5552641F3BF991C05EB1 24130~|~1~|~1~|~01/S<2~|~Intersection improvement~|~21 - Safety~|~5B3F83ABD141B27C220D81F9C27FE2516CD4C7C0 102525~|~1~|~1~|~01/STR~|~District Preservation Bridge Funds - 4PF7 (80%) / 4PS7 (20%) - No CAP - Replacement of structure at MUS-22-18.82 (SFN 6000630). BR Eligible for Replacement: Length = 50; SDFO (1); DSR = 5; SR = 49.1;~|~10 - Bridge Replacement~|~B082B9AE1E05D12D055BD860135B0F1A53AC652E 111556~|~1~|~1~|~01/MPO~|~Federally eligible work.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5BCC01882053A4AD16A1014AAD2AA8D1CCE7DCED 121342~|~1~|~1~|~01/NHS~|~NHS plan split.~|~01 - New Construction~|~8B2249B9F23CE467312FBAD69DE900EC53A79C34 109307~|~1~|~1~|~01/NFP~|~Culvert invert paving~|~04 - Reconstruction - No Added Capacity~|~BC1524C9BCBCA4092AF63469155669DEC3C13BCE 98056~|~1~|~1~|~01/NFP~|~Constructing road improvements to National Road Corridor~|~~|~CF6C7F1087692319CF8921FB8FEBF72004CE3AA1 98056~|~1~|~2~|~02/NFA~|~Construction road improvements in the National Road Corridor~|~04 - Reconstruction - No Added Capacity~|~DB3AD5DFE2FC7A29BF5C7DB3E3451BD78495C145 76794~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~09554A548F28D89B34BB392068429A42065BC908 90699~|~1~|~1~|~01/S<2~|~Stone box culvert replacement~|~44 - Other~|~910222E8E04ABF2997113496B1C0DDAEFDC905BA 101945~|~1~|~1~|~01/S<2~|~01/S<2/PV/ELIV - For Small City funded work at 95% Federal (80% 4B97 and 15% Toll Revenue Credit) matched with 5% Local (LNTP)~|~05 - 4R Maintenance - Resurfacing~|~14A68E0F7112198E38CA3198264EE55F10DDF9C1 96009~|~1~|~1~|~01/BRO~|~SFNs: 3502287, 3502317, 3502341.~|~13 - Bridge Rehabilitation~|~CCA91282ED2500DFEC6F98389629BC5A6901339A 126113~|~1~|~1~|~01/NFP~|~Change Order Block~|~44 - Other~|~C9D97A7D991AF48BA125E1AF271DA1736C455652 112721~|~1~|~1~|~01/NHS~|~bridge replacement Harrison over I70-9.75~|~13 - Bridge Rehabilitation~|~1505517605EE478748F7BDA4883E3C5F70360746 101044~|~1~|~2~|~02/S<2~|~Chip seal various routes in Champaign & Clark Counties: CHP SR 55 SLM 15.02 to 15.05 == CHP SR 296 SLM 2.33 to 2.84~|~05 - 4R Maintenance - Resurfacing~|~82909E015C1F828FFF040AF8A7ED2A3454E0250F 101044~|~1~|~1~|~01/STR~|~Chip seal various routes in Champaign & Clark County: CHP SR 54 SLM 0.00 to 1.70 == CHP SR 55 SLM 0.70 to 15.02 == CHP SR 56 SLM 0.00 to 5.32 == CHP US 36 SLM 22.33 to 29.05 == CHP SR 296 SLM 0.00 to 2.33 and 2.84 to 5.98 == CLA SR 56 SLM 0.00 to 4.13~|~05 - 4R Maintenance - Resurfacing~|~29DC4C7713027343A18D7F63EA12F68575CC5046 116726~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~ADEAACCAF85C635AAAD60DCBA3593CFFC3A82F9B 106417~|~1~|~1~|~01/STR~|~Left turn lane addition on WAS 821 2.30. Rural other federal aid funded 100% local (private).~|~21 - Safety~|~718476AC9D0E06D81AFF431D464E3E74CB8087C0 114494~|~1~|~1~|~01/NHS~|~FY26 Smoothseal project~|~05 - 4R Maintenance - Resurfacing~|~65F9027968BAFBA3C1AE4E735018ADBBAB1BDEC7 116279~|~1~|~2~|~02/S5K~|~Fine Graded Polymer Asphalt Concrete overlayHUR-4-6.691 to 6.702HUR-61-20.559 to 23.764~|~05 - 4R Maintenance - Resurfacing~|~6D47A0DDC2E99C43377F4CBD4BFC3D59E4DF3C3C 116279~|~1~|~1~|~01/STR~|~Fine Graded Polymer Asphalt Concrete OverlayERI-61-0.00 to 2.915HUR-4-6.702 7.923; 8.123 to 8.384HUR-61-23.764 to 23.910~|~05 - 4R Maintenance - Resurfacing~|~B246C842244B119ADC39CB4175158323147DF4CB 110708~|~1~|~1~|~01/NFP~|~To construct/replace sidewalks along the west side of Bodmer Avenue in the Village of Strasburg.~|~21 - Safety~|~B0B458B29798AA805B0E9DFC46138B31BDADE392 113231~|~1~|~1~|~01/NHS~|~This plan split is for the installation of the recessed wet reflective pavement marking for those roadways on the NHS system.~|~21 - Safety~|~38FC28339E022AD489027BBF5A5D2F107696D821 113231~|~1~|~2~|~02/S<2~|~This plan split is for the recessed wet reflective pavement marking for those roadways not on the NHS system.~|~21 - Safety~|~20BFC7E42BC06EFEB0B0A5B36CDBDCCA96D3A3D2 123523~|~1~|~1~|~01/NFA~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5016CCA3FB27793E37B44EC5118D6BC34DF71DA8 113133~|~1~|~1~|~01/IMS~|~Split for interstate PPM work~|~05 - 4R Maintenance - Resurfacing~|~0513096481C520720098F1FD7E42468CA70AC09A 113133~|~1~|~2~|~02/NHS~|~Split for resurfacing on NHS functional classification~|~05 - 4R Maintenance - Resurfacing~|~6B12C7A286F1F50A9331A471FFF3B36D1163C8BC 113133~|~1~|~3~|~03/S>2~|~Split for resurfacing on STP > 200,000 functional classification~|~05 - 4R Maintenance - Resurfacing~|~477B758F629D58D994F4A020C133FCCE8EE68168 113133~|~1~|~4~|~04/IMS~|~Plan split for the removal of wrong way speed bumps using SPR Research funds.~|~21 - Safety~|~58058EA3440DAECC8E56E16E967B3EDD6434CDE4 83933~|~1~|~1~|~01/NFA~|~3631427 HIG CR11 16.78 Intersect: Hardins Creek CEAO Project 80 Fed/20 Local Match Highland County 3630773 HIG CR11 17.43 Intersect: Bull Creek CEAO 80 Fed/20 Local Match Highland County 01/NFA/BR/High~|~10 - Bridge Replacement~|~075036C7C7B531192A3744736D1A47AE9E5C77D8 108879~|~1~|~1~|~01/S<2/MUSK~|~TID will construct improvements to E. Pike Road to gain access to the new Johnston Site Business Park in support of Project Johnston Site.~|~01 - New Construction~|~34FF51605720B95B7E7F3E6A7A6FFFA60C269DFA 126513~|~1~|~1~|~01/S>2~|~Plan splits for LBR Funding~|~13 - Bridge Rehabilitation~|~ABBB73315EFA8062A78FD5F12B210E17D13669DD 106448~|~1~|~1~|~01/NFA~|~The County will re-construct and widen approximately 5250 feet of Traxler Drive starting at US Route 20A and moving eats to CR15.~|~01 - New Construction~|~8135EEBDC78A42D1C515277BF13812557E4ADD66 104990~|~1~|~1~|~01/STR~|~District Preservation Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Plan Split for Guardrail upgrade on OFAH-Rural routes~|~21 - Safety~|~57038C90AE8C3A61E58689604B64EDAA3A3160A5 104990~|~1~|~2~|~02/NFA~|~District Preservation Funding - 4PS7 (100% State) -No CAP - Plan Split for Guardrail upgrade Not on the Federal Aid System route. ~|~21 - Safety~|~79F6531D5A8F64D44E0AC3DF051D09B381B5687E 109244~|~1~|~1~|~01/NFP~|~2020 Operations Chip~|~05 - 4R Maintenance - Resurfacing~|~6AC73BDB55A2778CB16F1B8194A8E47D05D6BE0F 110318~|~1~|~1~|~01/NHS~|~Culvert liner project. ATH 7 0.067, CFN 1880505.~|~04 - Reconstruction - No Added Capacity~|~1AF0AE84BD47EAD8249A8EBD13754AAB0F60F034 93150~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 6400485 PER SR13 19.02 Intersect: Little Rush Creek; BR Eligible for Rehabilitation: Length=86 SD/FO(1) SR=50.3 DSR=4~|~13 - Bridge Rehabilitation~|~A9BC74D17E78B0ACD65709A1EDBCACF606B7A249 93150~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: Per-SR 13-17.49 to 19.83;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E2C8F5BD6AA360F87FB5C111A1A59AA3ED0DEB9C 92752~|~1~|~1~|~01/STR~|~8707146 WOO SR582 12.41 Intersect: Toussaint Creek~|~13 - Bridge Rehabilitation~|~6CC123B6A705E93DF66668E47FF2D33A106CD671 93336~|~1~|~1~|~01/SAF~|~"01/SAF/PV/ " - Safety Funded 4HJ7 (90% Federal) / 4BC7 (10% State) - Superstreet construction from Allen Road to the Lancaster By-Pass~|~~|~5BBEB3B2C94D280DC2B2B466190B35D997EB1D86 87628~|~1~|~1~|~01/IMS~|~90/10 fed/state funding split for all work using federal IM funds. 1808850, 1808869, 1808885~|~13 - Bridge Rehabilitation~|~4E502B6B273C327EBFCC2FA7A0133A315E4DE6A4 87628~|~1~|~2~|~02/NFP~|~Split for non-federal guardrail work.~|~13 - Bridge Rehabilitation~|~F22948C575663C64076C376B38CF8B96E6708AE5 92127~|~1~|~1~|~01/NHS~|~resurface LUC US 20 LUC US20 0-7.98; Lucas county line to about King Road~|~05 - 4R Maintenance - Resurfacing~|~44ED46A579A78AFAFA5DEE788B5C28FD939DF318 92127~|~1~|~3~|~03/SAF~|~Turn lanes @ Crissey & Herr Rds~|~21 - Safety~|~CC499C740CA7751D92C52069D157F16E48B21526 92127~|~1~|~2~|~02/NHS~|~@SLM 6.00~|~13 - Bridge Rehabilitation~|~EBB033F00661EF742E69E649F8B8B182EC75346F 111378~|~1~|~1~|~01/NFP~|~The Summit TID will extend Fairlawn Corporate Parkway approximately 575 linear feet in the city of Fairlawn.~|~01 - New Construction~|~93BFC34180869485459ADCA0D33295B14B5D638C 121407~|~1~|~1~|~01/NHS~|~Plan Split for guardrail improvements along NHS routes.~|~04 - Reconstruction - No Added Capacity~|~2106D7484D73074C13E9C234BD38B2EB3676BA73 101525~|~1~|~1~|~01/STR~|~DSR# COL-005~|~04 - Reconstruction - No Added Capacity~|~14CE42674A9688957B220A1230E30867219E7968 106563~|~1~|~1~|~01/NFA~|~The Port will construct a new 1200 street (Ragan Drive) Starting at Woodbridge Blvd and moving east in the city of Bowling Greens Woodbridge Business Park.~|~01 - New Construction~|~5D889B258B9D30ABDD91FDD3D046B79E13CB9EF1 98361~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement project for FY2021. ATH 13 12.91-15.93, MEG 248 0.00-9.15 and MEG 681 9.00-28.94. Rural other federal aid funded 80 Federal/20 State.~|~21 - Safety~|~FA57D0C62B80E44349522360442D8A8F287DA255 98361~|~1~|~2~|~02/NHS~|~Guardrail upgrade/replacement project for FY2021. ATH 33 15.89-15.99, MEG 33 4.26-13.32, MEG 7 11.00-23.77 and WAS 7 14.05-17.61, 24.42-24.57 . NHS route funded 80 Federal/20 State.~|~21 - Safety~|~380C22F9778638C947449841C00A729A86CEAC9A 109605~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 15.35. Funded 100% state ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~806B0F619777AC3776112735D4F61B3BF5C9A571 125683~|~1~|~1~|~01/IMS~|~plan split to reconstruct the existing pavement~|~04 - Reconstruction - No Added Capacity~|~B2B9DBC3EDC78188496F4F99623E5877AD461E37 125683~|~1~|~2~|~02/IMS~|~plan split to add a lane to the roadway~|~03 - Reconstruction - Added Capacity~|~90159DB390643856E2D2FEFD1F4C08026E7F7E2A 125683~|~1~|~3~|~03/IMS~|~plan split for bridge work~|~04 - Reconstruction - No Added Capacity~|~6BBDCDC5DE2168326A8A683FDE7581C787A3AE56 122515~|~1~|~1~|~01/NFP~|~ODNR funded.~|~04 - Reconstruction - No Added Capacity~|~60AD1FF3BB936D9111CA01C94F8BAF2265435A0E 121080~|~1~|~1~|~01/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~74B56F43A741481772CA6A19260C7B44423033CD 122033~|~1~|~1~|~01/STR~|~Landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4F4C076AE3DC400A882436670EFE1CFCE26E983C 123910~|~1~|~1~|~01/MPO~|~Construction of a sidewalk on the south side of Lantz Road from Shoreham Drive to Virgallito Park.~|~28 - Facilities for Pedestrians & Bicycles~|~9703F933C7B8C0805EA66893A9FC1614630D0FED 122002~|~1~|~1~|~01/NHS~|~Intersection improvement~|~21 - Safety~|~EEF0AA87E2D3A674FAB79E8B9321979DD455B402 118941~|~1~|~1~|~01/STR~|~MOE 78-6.79 Culvert Replacement. CFN: 1872678. Funded 100% State.~|~04 - Reconstruction - No Added Capacity~|~9C47C0EF337A8C2DE4A4259AB8797726BA26072A 97199~|~1~|~1~|~01/SAF~|~Highway Lighting Maintenance~|~21 - Safety~|~D568B61E99BBDFCEE774F9E53E920C92E2562276 113604~|~1~|~2~|~02/NHS~|~Repair of bridge size corrugated metal pipe at GRE-35-0294 only.~|~04 - Reconstruction - No Added Capacity~|~CF3643D99F1F4488BCD5B446BA59FD2D31A4DF19 113604~|~1~|~1~|~01/STR~|~Repair of larger bridge size corrugated metal pipes on Rural Routes: CLI-350-2.59 and CLI-729-0.28~|~13 - Bridge Rehabilitation~|~4068B472E0007DD14BB1A8055899AFD466FA2843 113604~|~1~|~3~|~03/STR~|~Bridge work on the 3 Rural bridges that are under 20' length. These are: CLI-729-6.15, GRE-380-2.86 and GRE-380-4.71~|~04 - Reconstruction - No Added Capacity~|~5B9C335E897FB3975D4C973B740741A2DF07E799 102592~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 775 0.00-4.74. Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~20D1E85AD053DEA2FDA322D7D05C8FCE8CFF4276 102592~|~1~|~3~|~03/NFP~|~ODNR project to resurface the parking lot and camper pads at the Tycoon Lake Wildlife Area (Branch ID: 5, 8, 11-23). Funded 100% State.~|~05 - 4R Maintenance - Resurfacing~|~DB2301BE1BA4652EECCF8371D8EDB6195E5BB861 102592~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 141 7.70-16.05 and GAL 775 4.74-11.35. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~B830C47C30C4CEBE90A44CDFF458132A1394D37C 116074~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~E24438C64273170E4622E4B9F0CF0A655172B79E 83849~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation funding to resurface a portion of US 62 in Licking County from the 00.00 to the 10.51 mile marker which is rated as "OFAH-Rural". There are no funding CAPS on this project. ADA ramps within the Village are the District's responsibility to fund.~|~05 - 4R Maintenance - Resurfacing~|~1EB2A3533C6C4D8AA8725BA58D6EF3ACADAB5950 83849~|~1~|~2~|~02/STR/JOHN~|~"02/STR/OT/JOHN" - Local Funding to replace curb and gutter on a portion of US 62 in Village of Johnstown from the 04.57 to the 04.64 and form the 04.76 to the 04.91 mile markers which are rated as "OFAH-Rural". There is a funding CAPS of $40,000.00.~|~05 - 4R Maintenance - Resurfacing~|~5AE27509DDD35CA279F7B0D94E4D1ABCC5AB3C38 108352~|~1~|~1~|~01/MPO~|~Bike lanes in the City of Dayton.~|~28 - Facilities for Pedestrians & Bicycles~|~353B69BBAF59C47BC041683AC37A26AA9B700160 102613~|~1~|~1~|~01/IMS~|~Demolish parcels 14, 334 and 345 of the TTV Phase 1 Project, HAM-75-12.60 (PID 82288).~|~~|~46FC4CB5567A565F7A93E75185B52D15AC95260C 87061~|~1~|~3~|~03/STR~|~Rehabilitate bridge CLI-380-0399 (SFN 1403397)over I-71 by replacing the deck. Work will include raising to 16.5 feet, painting and other associated rehabilitation work items.~|~13 - Bridge Rehabilitation~|~5139B60D59F9767FF73BB00E48F704F4F4CD2008 87061~|~1~|~2~|~02/IMS~|~Rehabilitate overhead bridges CLI-71-0495 (SFN 1401564) and CLI-71-0567 (SFN 1401629) by replacing the wearing surface. Work on all bridges will include raising to 16.5 feet, painting and other associated rehabilitation work items.~|~13 - Bridge Rehabilitation~|~81A5F2D1E58E4B2A73E344EFBDFB7E749BA281CE 87061~|~1~|~1~|~01/IMS~|~Rehabilitate the concrete portion of IR 71 in Clinton County by adding 4.25" of asphalt between SLM 4.26 to 7.26.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8DB9819271F637FD874CBFB554C953F17953C678 110335~|~1~|~1~|~01/SAE~|~100% CEAO safety funded PM~|~21 - Safety~|~25C8ADCCDA2C5FF20754B246BA586DAA2E117AB2 93796~|~1~|~1~|~01/NHS~|~Replace Brdg structure 0802220Project Termini: Located 0.59 mile west of Georgetown on SR125. Project Description: It is proposed to replace the dificient structure. 80/20 split01/NHS/BR/State~|~10 - Bridge Replacement~|~3CB9D624904D9B64BFE399C1436CEF6E63655346 93796~|~1~|~2~|~02/NHS~|~BRO 125 7.11-8.59~|~05 - 4R Maintenance - Resurfacing~|~8ADD05BF295995C1260E1C35AC24CCF92756FC6D 112564~|~1~|~1~|~01/MPO~|~Rehabilitation of Elyria Ave~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F600C1F83024D560696B58732EA4C0A3F049FAC2 99723~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.75M.~|~17 - Construction Engineering~|~371E17E7FB301EB33596F2F040170B7066258D73 110431~|~1~|~1~|~01/S<2~|~Bridge replacement project. NOB 78 8.20, SFN 6101208. Urban other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~E7770DF830C4CBBC4393D2E93875436DCA0321F7 124749~|~1~|~1~|~01/SAF~|~All work included in this plan split.~|~21 - Safety~|~634CD48DC21002775D8184F67B6A855F1C290668 96799~|~1~|~1~|~01/STR~|~Plan split for 80% federal and 20% state funded culvert work using District Preservation Program Funds SACs 4PF7 and 4PS7.~|~44 - Other~|~4552A491747B9838DA4DC49E3ACF3732B47C08A4 88986~|~1~|~2~|~02/STR~|~US50 SFN 3600998 28.46 Brdg Rehab~|~13 - Bridge Rehabilitation~|~CDA0DA80123FFFF2A4F10F0321D2A6B4D82D96C5 88986~|~1~|~1~|~01/STR~|~HIG US50 18.27 - 28.59 Resurfacing ProjectOn US50, begin project 3.41 miles from Hillsboro corp limit and terminate at the Ross County line (SLM 18.27 - 28.59), it is proposed to resurface the highway.Pave Thru Brdgs:3600874 HIG US50 21.55 Intersect: Blinco Creek3600904 HIG US50 22.32 Intersect: Fork Of Blinco Creek3600947 HIG US50 23.78 Intersect: Puncheon Run3600963 HIG US50 25.55 Intersect: Cedar Run80/20 split~|~05 - 4R Maintenance - Resurfacing~|~C5DBE72FBCC1D0A9754F14A9D4547E842DE725E9 102277~|~1~|~1~|~01/STR~|~Spot paving various routes District 11.~|~05 - 4R Maintenance - Resurfacing~|~D733B5B94D6DE570F03AD0E70EBF2736F428DDB5 119069~|~1~|~2~|~02/MPO~|~Reconstruction of Blue Ash Road including sidewalk replacement, stormwater improvement, new signal, crossings and EV charging station.~|~28 - Facilities for Pedestrians & Bicycles~|~7D5FEA0687D19F1A598F6525D9E2C2614F745CB7 119069~|~1~|~1~|~01/MPO~|~Reconstruction of Blue Ash Road including stormwater improvements~|~04 - Reconstruction - No Added Capacity~|~E041F7F6041A7D1AFFB0A0FEB5576755BECDD009 119069~|~1~|~3~|~03/MPO~|~this split will cover the EV charging station~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~7E3CDD983F5B2FF901E306EF7A666F3293CEC05B 83450~|~1~|~1~|~01/STR~|~Enhancement to fix and install sidewalks, decorative lighting and trash recepticles.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1ED31DB95C56AE2FDA2A28118016BF5F46EC664F 123950~|~1~|~1~|~01/NHS~|~geotech plan split.~|~04 - Reconstruction - No Added Capacity~|~03C051B24A91AF07E83A1938B9A87EF0A1F9243D 118637~|~1~|~1~|~01/STR~|~ATH SR 13 13.71 270 Feet Rockfall Hazard Remediation ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~448B399E058D1BA6C9A502E5F2F1525FE56876EB 118843~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~~|~82F8BE0F8A5F19EA25062E2003EB11E7FCA6E200 96374~|~1~|~1~|~01/S<2/STRA~|~Upgrade of access to Strasburg Ind Park; Federal aid routes 12th St. and Zeltman Ave.~|~04 - Reconstruction - No Added Capacity~|~8A5C97C78F6746DEC56E338B544D7EB5938790E9 88792~|~1~|~1~|~01/S>2~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the Dayton Urbanized area on US 42 between SLM 8.76-11.23. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~22FC2155D30C50E2D038CD81442D7C99FE4D4187 88792~|~1~|~4~|~04/NHS~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the NHS portion on US 68 between SLM 8.95-9.43. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~270D51B213EB4BA4AD86415E2A24976039E28B10 88792~|~1~|~3~|~03/NHS~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the NHS portion on US 68 between SLM 8.95-9.43. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~CFA46D2F8412FF9B1BEAE741AC1B86FA750C7D85 88792~|~1~|~2~|~02/S>2~|~FY2014 Urban Paving in the City of Xenia on US 42 and US 68. This Plan Split is for the Dayton Urbanized area on US 42 between SLM 8.76-11.23. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~D1AB7EC2634007532CBC3BA72D5D1E86E26CED52 101601~|~1~|~1~|~01/STR~|~DSR# JEF-013~|~04 - Reconstruction - No Added Capacity~|~4C8CAFA9C869F4148F95FA1EE9D1E68FF11B40A0 102253~|~1~|~1~|~01/S<2~|~Industrial Dr.~|~04 - Reconstruction - No Added Capacity~|~B7222A72E42A2F5D70FC491A6BBAE6C17892A417 107770~|~1~|~1~|~01/NFP~|~All work in this plan split. Uses 100% state funds from the district preservation budget (SAC 4PS7).~|~21 - Safety~|~6CA9BDC34C18532F046F118C7F08FD915E6AFEDD 88934~|~1~|~1~|~01/IMS~|~Plan Split for MAH IR 80 3.92 to 5.75 and TRU IR 80 0.00 to 4.61.~|~~|~03D317956E9BFD9E3563C7E485795079A260294E 93565~|~1~|~2~|~02/S>2~|~This split is for the added culvert on US-20A @ 5.87~|~44 - Other~|~A932A1717F16AB221673D75A5873608D827E6151 93565~|~1~|~3~|~03/NFP~|~This is for the water line.~|~44 - Other~|~B64545F186DE58DEDDEA43F70EBD1D4F00867BCA 93565~|~1~|~1~|~01/SAE~|~Build a roundabout at the intersection of US-20A and Eber in Monclova Twp. This 100% local funding is to be used first.~|~04 - Reconstruction - No Added Capacity~|~C1B57C4984B2398B070F30A3B19ED37FF8BDE144 83263~|~1~|~1~|~01/S<2~|~Bridge replacement project. HOC 664 16.18 and 16.31. SFN's 3704688 and 3704718 respectively. Urban other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~2765E29A028E128F86B2725D1D8B0CADA763B335 120702~|~1~|~1~|~01/MPO~|~Resurfacing work on S. Waterloo~|~05 - 4R Maintenance - Resurfacing~|~C325CF6D94E65C050AECFFF413F7F9318606385E 120702~|~1~|~2~|~02/NFA~|~Plan split for work on Darwin and Thames Ave which are not on the federal aid system~|~05 - 4R Maintenance - Resurfacing~|~46F42B6658BDE2ADDBA76B4A2286485E5DDBD2A4 110615~|~1~|~6~|~06/NHS~|~Minor bridge rehabilitation > 20' span.~|~13 - Bridge Rehabilitation~|~AB438FD5C7F9C88DAF9B84D01DDAFE9CD9C29910 110615~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~48A31FE05EBF75726CEFB12D229C183BCA24138D 110615~|~1~|~4~|~04/S>2/CANT~|~Resurfacing, urban paving in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~036B41FA88181E9ED2D995B8A87CCD3C3DEC28C4 110615~|~1~|~2~|~02/NHS/CANT~|~Resurfacing, urban paving in the City of Canton.~|~05 - 4R Maintenance - Resurfacing~|~FDCF5474BB35B260E95925A87E1E12A52EC6CC51 110615~|~1~|~5~|~05/S>2/CANT~|~100% Canton items, includes full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~A4DFC745D3DC50BA5D7E506F76B2E9C223796C1D 110615~|~1~|~3~|~03/NHS/CANT~|~100% Canton items, includes full and partial depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~B1FF1F5B432804D90B78EC5AA352446141765044 110615~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment~|~44 - Other~|~6BA853D3E952437CE200E5BEB621497FAF3F9D3D 106158~|~1~|~1~|~01/STR~|~Landslide repair. MRG 78 13.10. DSR MRG-005. Rural other federal aid funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~585DF11AC5770FD200F921392D28B52641E01137 106158~|~2~|~2~|~02/STR~|~Landslide repair. MRG 78 16.62. DSR MRG-006. Rural other federal aid funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9D0A08D3FF3FED4D9400BCA3A15C58160E277ED9 106158~|~2~|~3~|~03/STR~|~Culvert replacement. MRG 78 16.63, CFN 1822163. Funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~0343BF8D5B2A72CF5775941005F46372CDAB9D33 106158~|~1~|~4~|~04/STR~|~Added site MRG SR 78 13.00-13.02 from OH2019-01 event on DSR MRG-002. Added by Change Order for repair under already let contract 19-7026, 100% Federal ER funding.~|~17 - Construction Engineering~|~D95100AB71C647081A276D246DDF5A620253DDEF 106158~|~1~|~5~|~05/STR~|~Landslide repair site at MRG 78 16.55-16.58. District preservation funds, 80% Federal/20% State. Added by change order.~|~17 - Construction Engineering~|~57726D7B6C09DB3C0F322CD74B1CA23A82D82812 100809~|~1~|~1~|~01/S>2~|~Replace the superstructureBlack fencing and lettering to be paid by the local.~|~44 - Other~|~91326162DD335AC0155DF528A344FF8A9373C6C1 117920~|~1~|~1~|~01/NFA~|~I-75-G 157-181~|~63 - Electric Vehicles & Charging Infrastructure~|~AC9F2E92BF3D168D287EB8DB5D8774FAA5B496CE 107463~|~1~|~1~|~01/S<2~|~Resurfacing US 40 from St. Clairsville to SLM 23.58 (Blaine)~|~05 - 4R Maintenance - Resurfacing~|~6BCB66D6DC89FEE9D5C5BCE90DAA30E9A3C982F5 101305~|~1~|~1~|~01/STR~|~Covers resurfcacing on Rural STP state routes, including 61, 745, 31 and 19.~|~05 - 4R Maintenance - Resurfacing~|~86603339F92553F15EBA1B182B960B261BAD5E62 125149~|~1~|~1~|~01/S>2~|~Plan Split for general funding, TRAC Award~|~04 - Reconstruction - No Added Capacity~|~261C358F573CBB8CE882E7D5B3E19BE99DAD25D5 125149~|~1~|~2~|~02/NFP~|~Plan Split for Non-TRAC; non federal aid improvements~|~04 - Reconstruction - No Added Capacity~|~81A1C774EF19D0F444EC0899B2D31E36DF6B1712 125149~|~1~|~3~|~03/ERD~|~Plan split for Build grant, work items to be determined~|~04 - Reconstruction - No Added Capacity~|~DACD820232A92C77A04D72476FC689901B40CFA3 93172~|~1~|~1~|~01/NHS/STID~|~Widening from two lanes to 4/5 lanes between Kaufman Avenue to Milan Street, Lake Township, Stark County, Ohio. Includes turn lanes, possible roundabouts, signal and sign upgrades, drainage improvements.~|~03 - Reconstruction - Added Capacity~|~A57B78AC3AAB7D1C6E8655CF2C3D5C0B76F8454E 93172~|~1~|~2~|~02/NHS~|~Minor bridge work to one structure.~|~13 - Bridge Rehabilitation~|~03B4DAFB0BF4E73DF35EA0B2340AB25008BB5FAC 93172~|~1~|~3~|~03/NHS/HART~|~Sidewalks and curb ramps in the Village of Hartville, Stark County, Ohio.~|~03 - Reconstruction - Added Capacity~|~79819537276525F075323D35B2F7B3E566F68FE3 123619~|~1~|~1~|~01/NFA~|~Plan Split - Not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~46E0C12C7813391816C0C579346A4BC242F76342 87706~|~1~|~1~|~01/IMS~|~Reactive Maintenance - 90/10 District Allocation~|~05 - 4R Maintenance - Resurfacing~|~2FAF208D9C70339C6307238D596E0271A3BE447B 124433~|~1~|~1~|~01/STR~|~Construct a roundabout at the intersection of MAR SR 203 and MAR SR 739~|~21 - Safety~|~6BC4A33A2F30D4D7A83666292688B3DEF4EDF4C2 105067~|~1~|~1~|~01/BRF~|~See linked structure.~|~10 - Bridge Replacement~|~00CD6D12D10810E8D6F8F00DA6F878A95047FF73 109687~|~1~|~1~|~01/STR~|~Resurfacing SR 212~|~05 - 4R Maintenance - Resurfacing~|~8C00DA67046E1F0132A3632A0982D6DB3D9C1EB7 102279~|~1~|~1~|~01/SAF~|~Programmed intersection lighting~|~17 - Construction Engineering~|~64098E9BB81202364DF122F1EC58453DCADCD648 125243~|~1~|~1~|~01/BRF~|~Complete bridge replacement utilizing 4R87 Federal funds at 95% up to maximum ($822,893).~|~10 - Bridge Replacement~|~BB2AB3B7B75918026C525FA47F6180E0305DC38B 116525~|~1~|~1~|~01/NHS~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~8A4A7E5FA08E67F63AD7CAD29C88A1E56E2280D0 120924~|~1~|~1~|~01/S>2~|~Stream and conduit repairs due to erosion.~|~04 - Reconstruction - No Added Capacity~|~6AA445B962E82B61C07E77B7D9DC87A11D35BA88 102093~|~1~|~1~|~01/NFA~|~The City is constructing road improvements, reconstructing and widening Columbia road to two lanes with one center turn lane fromt he intersection at Kingsview Drive north to the municipal limit and adjusting the vertical profile.~|~01 - New Construction~|~AEF725DD86AAFE739736F0C21EC6DFEEED50F53E 123787~|~1~|~1~|~01/CMQ~|~Traffic signal upgrade, including pedestrian crosswalks, and sidewalks, utilizing 100% BHJ 4TB7 funding.~|~21 - Safety~|~8357ACC79FCF6AE836CAE6D33DCA69876E38694B 123787~|~1~|~2~|~02/ENH~|~Traffic signal upgrade, including pedestrian crosswalks, and sidewalks, utilizing 100% BHJ 4TB7 funding.~|~28 - Facilities for Pedestrians & Bicycles~|~979406E537001B681CE47EA4EA2606652E89D4E9 114539~|~1~|~1~|~01/CMQ~|~Plan split for CMAQ eligible work for multi-purpose trail.~|~28 - Facilities for Pedestrians & Bicycles~|~28C9D9E5E06B1A6815ACF5EAF58DC819EC8CC201 102319~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads in Logan County.~|~21 - Safety~|~978A5D467F742B9203B4BC08ED12ABA7EDA3B910 114473~|~1~|~1~|~01/NFA~|~Resurfacing JEF-646 from SR 152 to SLM 7.36~|~05 - 4R Maintenance - Resurfacing~|~BCD7DCAB591C6E73E88EC53737CC0BFDBA2A15F7 114473~|~1~|~2~|~02/S<2~|~Resurfacing JEF-646 from SLM 7.36 to SR 43~|~05 - 4R Maintenance - Resurfacing~|~40761693B7244A41C6862AC5EF66201D6BA5E459 105254~|~1~|~1~|~01/NHS~|~Resurfacing SR 11 from SLM 22.70 to the MAH Co. Line~|~05 - 4R Maintenance - Resurfacing~|~515C14E9D0F98B8EBD2C3DC371F6A27C257C5AED 105254~|~1~|~2~|~02/NHS~|~Bridge deck sealing~|~17 - Construction Engineering~|~5E1E89BD5EC43E2FF2E46610AE15FDB9FA9F81BB 99504~|~1~|~1~|~01/SAF/LCEO~|~County Engineer's Association Highway Safety Improvement Program (HSIP) Funding - 4HB7 (100% Federal) - See CAP Comment - Licking County Wide Pavement Marking of various County Roads.~|~21 - Safety~|~12F77B93933A07531E6002092A2763A568284243 122847~|~1~|~1~|~01/MPO/YOUN~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~EFE1361BA4D19DBFE9E530A5CD674B9E1482CF31 95726~|~1~|~1~|~01/STR~|~Pavement~|~05 - 4R Maintenance - Resurfacing~|~E7BCDB03E81D66BF7DA51B893E5181CFF6B7F0A8 95726~|~1~|~2~|~02/STR~|~Culvert on SR-109 @ slm 5.26~|~04 - Reconstruction - No Added Capacity~|~C8A26AD8F0E149DC2E5A51D3311AA64FC6053913 117491~|~1~|~1~|~01/NFA/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~98A122EDC9FFD53B7A132EB6E5ADFC66D2A0167E 95717~|~1~|~1~|~01/NHS~|~LUC-2 from SLM 9.14 to 10.17~|~05 - 4R Maintenance - Resurfacing~|~C0D3680724867203BF44ABD4AEFAE39AEC95DF69 95717~|~1~|~2~|~02/NHS~|~Bridges~|~13 - Bridge Rehabilitation~|~8B580EB53436740A5F01DDD3031311ADB1C6728D 95717~|~1~|~3~|~03/IMS~|~Bridges~|~13 - Bridge Rehabilitation~|~E8C001B7073C5F80E232452057C207D52819A5CA 95717~|~2~|~4~|~04/NHS~|~Part 2 - Paving within the Village of Ottawa Hills~|~05 - 4R Maintenance - Resurfacing~|~6468618E766DBB1A239E0ABFCB185DACB424CD33 95717~|~2~|~6~|~06/NHS~|~Part 2 - 100% City items~|~05 - 4R Maintenance - Resurfacing~|~83EE4623FA906F1FD8D4D7C6F53C298B4CA4550E 95717~|~2~|~5~|~05/NHS~|~Part 2 split for Urban Paving within Toledo~|~05 - 4R Maintenance - Resurfacing~|~46F44081FDA05296B9EB9E56590D8C62401CBEB3 116895~|~1~|~1~|~01/MPO/ALLI~|~Resurfacing of Mahoning Ave in the City of Alliance.~|~05 - 4R Maintenance - Resurfacing~|~23D4E740490CB476E9B1A27A223B03F455336769 116895~|~1~|~2~|~02/MPO/ALLI~|~Resurfacing of Glamorgan St in the city of Alliance.~|~05 - 4R Maintenance - Resurfacing~|~A7582C1BF6484AC4CC48408EBA4565F47B808DE6 99472~|~1~|~2~|~02/NHS~|~Geological Site Management Funding - 4SF7 (80%)/4SS7 (20%) - No CAP - Rock Scaling of the rock face on COS-US 36-27.82.~|~21 - Safety~|~9681EC05E9315DBF6BEBC10E65BAD41AFEE7E586 99472~|~1~|~3~|~03/S<2~|~Geological Site Management Funding - 4SF7 (80%)/4SS7 (20%) - No CAP - Rock Scaling of the rock face on COS-SR 83-13.55.~|~21 - Safety~|~E39A75A2C48E5B7832E970DBBB2E6FA118624E5A 125475~|~1~|~1~|~01/CMQ~|~construction of a SUP along Winton Rd between Sharon Rd and Kemper Rd~|~28 - Facilities for Pedestrians & Bicycles~|~9661D5787B20BF39F2734E3E7BFF17FA741E0809 91845~|~1~|~1~|~01/STR~|~General System asphalt resurfacing on HOL-241-0.00 to 7.75.; includes pavement repairs, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~A35E00A754C348B7B5325A2BF891E8D0D362534F 93776~|~1~|~2~|~02/IMS~|~Bridge rehabilitation on SFN 5707560 MOT 75 1178 M (RMP US 35*W - I 75*S~|~13 - Bridge Rehabilitation~|~5420DADD61754EBF6161D78064D8F48A7984FC43 93776~|~1~|~1~|~01/BRO~|~Replace six span structure with single span structure over Albany Street on SFN 5707366 MOT 75 1164~|~10 - Bridge Replacement~|~B2EAB4EACD74A6AED39356A5A4CA581D4CAE8DC5 93776~|~1~|~3~|~03/IMS~|~Reimbursement for crash attenuators~|~10 - Bridge Replacement~|~2654C642B9B7A2A5725CDC9FF58510900EB71B42 87729~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~A270C57834B4892427D5CB9FB664A31092C0F987 87729~|~1~|~2~|~02/NHS~|~Bridge work determined later~|~13 - Bridge Rehabilitation~|~CF425C8A9D07CEE5D52737FC6FFB293A4DF4A3C6 87729~|~1~|~3~|~03/SAF~|~Split 3/1 is additional cost for permanent wet reflective optics (100% 4HJ7 / $1250 per mile) and for Grooving costs for the wet reflective permanent pavement markings (100% 4HJ7 / $5280 per mile), capped. Remaining balance will be paid for with Dist funds (4PF7/4PS7).~|~21 - Safety~|~368F052C2C335003C454874CD8311B5034DE4D1C 96168~|~1~|~1~|~01/STR~|~Project to include several drainage maintenance items along SR 732 in Village of Reily. Improvements include replacing, abandon, or provide alternative water path for the following culverts: BUT-732-0290 and BUT-732-0291L. Replace the following culverts: BUT-732-0294, BUT-732-0295R, and BUT-732-0296R.~|~~|~F5042CB23ED4C5DB0F45B7EE3BB18B7DC7622DEB 95099~|~1~|~1~|~01/ERD~|~Earmark ID FL1201 is an earmark with 100% federal pariticipation to be used for replacing a culvert under Riverview Road and reconstructing Vaughn Road to minimize damage to flooding near the intersection of Riverview Road and Vaughn Road in the City of Brecksville.~|~44 - Other~|~9D2690E3B7D57462B46F7325BCC164F0C9DB792E 103288~|~1~|~2~|~02/S>2/NCAN~|~Waterline.~|~43 - Utilities~|~EF8E8C5B2AFD46A3F78D6D11E3735D4CD6CE46A2 103288~|~1~|~1~|~01/MPO~|~Construction of roundabouts, drainage, curb and gutter, signing, pavement markings, lighting, aprons, landscaping. Intersection of Shuffel (CR230) and Pittsburg (CR-216) and Orion (TR-217).~|~21 - Safety~|~749A97A1E959FAE66D5B0CA655338629CF0994B2 124583~|~1~|~1~|~01/IMS~|~Plan split for deck replacement of federally eligible bridge on the interstate system~|~13 - Bridge Rehabilitation~|~7BB4FA5D6C7CB493ADDEAACFD7DB3C94A48E77A2 102321~|~1~|~1~|~01/SAF~|~Upgrade existing guardrail on various county roads in Logan County.~|~21 - Safety~|~1138041724F675E6C59DC54FA355197B18070D9A 83018~|~1~|~4~|~04/S>2/FRA~|~100% item - water line relocation with FRA County Sanitary Sewer District (public utility - legislation with FRA County)~|~43 - Utilities~|~14946E2E177469EFEE58F57582E0A558CE9A8534 83018~|~1~|~2~|~02/S>2~|~D6 funding for resurfacing and drainage~|~05 - 4R Maintenance - Resurfacing~|~20612370DDF0648B807EA00A9F8B5B50FE64DA20 83018~|~1~|~1~|~01/SAF~|~Safety funded section improvement-medians, sidewalks, access relocations/closures, signals~|~21 - Safety~|~37F1D9DE47EA9F44DB2B47868715E36503C01644 83018~|~1~|~3~|~03/ENH~|~Enhancement funding for landscaping items with Franklin Township~|~28 - Facilities for Pedestrians & Bicycles~|~F65FAC6B2E33338D1F4D064DE699A515F0A52D18 87755~|~1~|~1~|~01/S>2~|~80/20 fund split for District Preservation funding for the structural steel painting of SFN 4305671 (LAK-283-0472) over Chagrin River approximately 3.84 miles west of SR-306.~|~47 - Bridge Preventive Maintenance~|~1F2E42D990E33B2841797180A6D7F57F6D8920F9 125402~|~1~|~1~|~01/STR~|~Resurfacing and related work on US 22 in Perry County.~|~05 - 4R Maintenance - Resurfacing~|~D1012F13209C37F9F34C2E718A1A561994CC94A6 104955~|~1~|~1~|~01/STR~|~Plan Split for Bridges MAR-309-12.73, MAR-309-25.37~|~47 - Bridge Preventive Maintenance~|~72EA26C470F0EE7C959C98EA14DA20E95878649D 104955~|~1~|~2~|~02/NFA~|~Work on MAR-746-6.25 structure. Not on Federal Aid System~|~47 - Bridge Preventive Maintenance~|~9AD9B3BF0A61F2E7276D4444DBE965575D3AA5EB 82381~|~1~|~1~|~01/IMS~|~Mill and fill resurfacing existing IR 70 mainline and construction of an additional lane on IR 70 from Enon Road to US 68 at 0.68 mile east of the Junction of SR 4 (Springfield) to the junction of US 68.. Construct a noisewall. CLA IR 70 6.75/10.55~|~03 - Reconstruction - Added Capacity~|~EC16A4E908DB0A8E766CFBAC4DFE74F19ED3C13C 118979~|~1~|~1~|~01/S5K~|~Plan Split for Major Collector, - Urban 5,000 - 49,999" in Wauseon urbanized area. Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~884C3F9D9C034754A80F479A5EF2F0FC49F8BCA9 118979~|~1~|~2~|~02/STR~|~Plan Split for Major Collector for Rural <5,000" road segment(s). Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D3C08D451B92D8A9E2541447B8D534688F158FA1 118979~|~1~|~3~|~03/NFA~|~Plan Split for Minor Collector for Rural <5,000" road segment(s). Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~5534481CF2832657FAC7F2A1434DD06A72EF508F 118979~|~1~|~4~|~04/NFA~|~Plan Split for Minor Collector for Rural <5,000" road segment(s). Reconstruction~|~04 - Reconstruction - No Added Capacity~|~7C3B400B6B6D90445B1988B0432C2E4C59AEF822 119082~|~1~|~1~|~01/NHS~|~Plan split for project to rehabilitate bridge size culvert HAM-52-3918 with carries US 52 over Eight Mile Creek by lining with a new pipe.~|~13 - Bridge Rehabilitation~|~61E36D601B6E9CA7242763B7052A267F2AFFCCBC 124405~|~1~|~1~|~01/NFA~|~Sidewalk and Crosswalk enhancements at 4 Groveport Madison Schools~|~28 - Facilities for Pedestrians & Bicycles~|~E023A03882691B175C267B8F457E80B2B87BEC7C 124024~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay with Repairs: HUR-61-0.00 to 0.490; HUR 61-2.580 to 2.923; HUR-103-1.624 to 3.144; HUR-598-3.037 to 3.138Asphalt Concrete Overlay without Repairs: HUR-61-0.490 to 2.580Includes bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~A935D7C5CE1CE7378F40393C44D16924910A7A4A 124024~|~1~|~3~|~03/NFA~|~Asphalt Concrete Overlay with Repairs HUR-598-3.138 to 4.215 including bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~273C39DBD23F7078925FC8CB42004BABB85284FC 124024~|~1~|~2~|~02/STR~|~Asphalt Concrete Overlay with Repairs:CRA-602-13.641 to 14.465HUR-103-0.00 to 1.624RIC-603-16.918 to 18.548Includes bridge maintenance~|~05 - 4R Maintenance - Resurfacing~|~F4AAB9C060D35AE14B19D3CBDC1CCF127B2C0212 115316~|~1~|~1~|~01/STR~|~Items eligible for TAP funding - Sidewalks, ADA elements, lighting, etc.~|~~|~E0C5516ACC49EF32216BEEA36F1F1518AD10E824 115316~|~2~|~2~|~02/STR~|~100% Local funded items to reconstruct roadway up to the asphalt base. Including urban gutter drainage facilities and earth work, etc.~|~~|~63EDCE49D3AAFE98CACE7E1C41F9B9A2DBB4D71D 97390~|~1~|~1~|~01/BRO~|~Plan split for all bridge work using federal funds~|~13 - Bridge Rehabilitation~|~2FCAC533695F426D95BD527E88F2CE23DEB5F4F8 97390~|~1~|~2~|~02/NFP~|~Split 2 for CPP work at 100% local cost~|~13 - Bridge Rehabilitation~|~10C695EC030CE74245B856FD139CF1909B12E1E6 97390~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~13 - Bridge Rehabilitation~|~6963D135CB87D1C244E15CF400B1C76D1978A2FE 95421~|~1~|~2~|~02/STR/LAW~|~Rural section: 1.27 to 4.30Complete description:On CR31 (Big Brand Road), begin ar CR1 and terminate at CR17, it is proposed to resurface CR31 begining at SLM 0.00 and terminating at SLM 4.30 80 Fed/20 local match~|~05 - 4R Maintenance - Resurfacing~|~199DFD3852CBAD230AB1E8CF9824B0ABABDAB775 95421~|~1~|~1~|~01/MPO/LAW~|~MPO section: 0.00 to 1.27Complete description:On CR31 (Big Brand Road), begin ar CR1 and terminate at CR17, it is proposed to resurface CR31 begining at SLM 0.00 and terminating at SLM 4.30 80 Fed/20 local match~|~05 - 4R Maintenance - Resurfacing~|~A67BFD4F23887EA98D626EB7580684ADE8D18775 17779~|~1~|~1~|~01/STR~|~Covers all project related construction items~|~21 - Safety~|~11B67169636732CD9555B721CCD424E910BDC55C 109734~|~1~|~1~|~01/STR~|~work on the rural sections of GRE-42~|~05 - 4R Maintenance - Resurfacing~|~B934D71DB29C55D9D7497CCCABA0A50E9B8BCF59 109734~|~1~|~2~|~02/S>2~|~work on Large Urban portion of GRE-42~|~~|~C9A278E8C249C2B9C58F4CC5818ED1951824B7AA 116335~|~1~|~1~|~01/STR~|~Plan Split for resurfacing on PRE-127~|~05 - 4R Maintenance - Resurfacing~|~4E60D3805B2D0F7A440AE8FE83F3A938D6328905 88004~|~1~|~2~|~02/STR~|~100% Rural Lorian County Water Authority (RLCWA) funding responsibility~|~44 - Other~|~DC464E3F74560B3BF4E5F22A0508BBCDE8345DE7 88004~|~1~|~1~|~01/STR~|~Culvert Replacement~|~44 - Other~|~FEA3140577411BBD2AF577026D019163B9521653 122553~|~1~|~1~|~01/NFA~|~Resurfacing project of the NOB Seneca Lake Parkside Campground roads. ~|~05 - 4R Maintenance - Resurfacing~|~78F1B14C021680E1A07E020F07985621A3D40544 123525~|~1~|~1~|~01/IMS~|~Plan split for culver replacement and repair at various interstate locations in the district~|~04 - Reconstruction - No Added Capacity~|~93D5DF057AC6AB5A6788F9E1110FA0045A3DFD8A 122877~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~F6E42A10CC99E30E264D7BE68E80A4066C1C38D9 96115~|~1~|~1~|~01/NFP~|~Construction Inspection~|~17 - Construction Engineering~|~A80D23F7AF2FD1687AE5755383B55DA834BDCEB7 119711~|~1~|~1~|~01/STR~|~Construct Trail~|~28 - Facilities for Pedestrians & Bicycles~|~63EF06769FAB678FFA1D5E5E966742DD7556420B 112174~|~1~|~1~|~01/NFA~|~Overhead sign replacement in various locations throughout District 9.~|~44 - Other~|~4A281209593833341C6EE9A766D93DC5A546E012 110960~|~1~|~1~|~01/NHS~|~Landslide repair project WAS 7 36.50-36.53 using 80% Federal/20% State Preservation funds.~|~17 - Construction Engineering~|~7859EF7585D386669E8ECF2E961C5A2256ADE026 101343~|~1~|~1~|~01/STR~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~C99A2200A125965E48F07DB76EB93E733ED0CB7F 103411~|~1~|~1~|~01/IMS~|~Plan Split for the demo~|~44 - Other~|~A43E083796D374909CBCAEB0F748D47DC10C050A 121126~|~1~|~1~|~01/STR~|~Resurfacing SR 170~|~05 - 4R Maintenance - Resurfacing~|~C91D95300AFACE1E1AF43CA8803EFF3726FD1F18 115735~|~1~|~1~|~01/SAF~|~2027/2028 Traffic Signal Maintenance~|~21 - Safety~|~7B0D40A42DAB84B8ADCD8D16B60C3DD078DE95E3 88979~|~1~|~3~|~03/S<2~|~District Allocation: CRA-19-0.70~|~44 - Other~|~0249ADBF8FD2234F0AE0FC92D51BFC6C1CB071A8 88979~|~1~|~2~|~02/IMS~|~Bridge (< 20') Repair: WAY-71-6.29~|~13 - Bridge Rehabilitation~|~0F1A26854C67C602986136727643E802B98A4FF7 88979~|~1~|~5~|~05/S>2~|~District Allocation (4PS7): MED-57-10.00~|~44 - Other~|~2C120E82A0267076DAF5B09298D4D6021F96A187 88979~|~1~|~1~|~01/IMS~|~District Allocation: LOR-90-14.14 / MED-76-6.10 / MED-76-10.42 / RIC-71 & RIC-97 Ramp~|~44 - Other~|~38CB8B378356F6BA0BA583CF4A1BDD6D34FB001A 88979~|~1~|~4~|~04/NHS~|~Culvert Rehabilitation: RIC-39-11.49~|~44 - Other~|~70270C4C4536BDB4E1DDAC1D7B54E5A7428AFB22 107321~|~1~|~1~|~01/IMS~|~See linked structures > 20' span.~|~~|~DAADCF59C51DE1D0E3C6518E63EF90C467279206 107321~|~1~|~2~|~02/NHS~|~See linked structures > 20' span.~|~~|~32B38F97028ABF158EB1CE76F33CF4DF0EA369FF 86028~|~1~|~1~|~01/ENH/JOHN~|~"01/ENH/BR/JOHN" - Enhancement Funding 4B37(80% Federal) / 4BG7(20% Local) - CAP of $429,000.00 for 80% Federal Share - Enhancement project to construct a bridge and connecting bike path in Johnstown between the Kroger Entrance and Westgate Drive.~|~28 - Facilities for Pedestrians & Bicycles~|~433A929A4914EE2C26FB6FE1B757A2533D49927F 117793~|~1~|~1~|~01/NHS~|~All work improving conduits and storm sewers in the project~|~04 - Reconstruction - No Added Capacity~|~7C9BC60D28245646C7FA83A319E19E3E7DC83CB6 105327~|~1~|~1~|~01/NFA~|~Smooth seal on non-Federal Aid route: LOG SR 274 SLM 12.24 to 15.78~|~05 - 4R Maintenance - Resurfacing~|~45B4F6C2CEF8C06D3B9A5964BE1CCD0B64D34D96 116955~|~1~|~1~|~01/IMS~|~Split for pavement replacement work on IR-90~|~04 - Reconstruction - No Added Capacity~|~66881ED552F142528F9207A9139C6EE5DB7947E2 116955~|~2~|~3~|~03/IMS~|~Slope repair adjacent to the WB west area on ramp.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A1351DE531C4C70C7BDE05A66B995667AF1DF8E 116955~|~1~|~2~|~02/IMS~|~Plan split for bridge maintenance work to be completed in MOT zones during major rehab~|~47 - Bridge Preventive Maintenance~|~F645E8B5892A7671E96613FAB21FF32957E91816 127001~|~1~|~1~|~01/STR~|~Bridge Replacement ~|~13 - Bridge Rehabilitation~|~BE490E17273630AB2A96B3FF7927F8BF91B7555D 84655~|~1~|~1~|~01/IMS~|~IR76 06.31-8.42 Minor rehab pavement resurfacing~|~05 - 4R Maintenance - Resurfacing~|~8F38A4F18CC0D0FCB27F989F7897D5361BA201C6 84655~|~1~|~2~|~02/IMS~|~Bridge work to ten structures along IR-76 in the City of Akron, Summit County, Ohio.~|~13 - Bridge Rehabilitation~|~B77BD08795B868BB028480096F89D084B15180B4 86444~|~1~|~1~|~01/MPO~|~Traffic/Safety Cameras: Install conduit for the City's telecommunication system for approx. 100 security cameras inside the Banks garages and at the street levels throughout the street grid. Cameras will be connected to the ARTIMIS system. Second Street (Elm St to Main St): Enhance the north sidewalk to improve the pedestrian zone and relocate utilities in order to provide an ADA accessible path to the Riverfront Transit Center head houses and replace failed sidewalk. Freedom Way (Rosa Parks to Walnut St): Reconstruct the alignment and grade, including the replacement of the expansion joint at the back of the north walk, to better align at its termini and improve drainage and pedestrian safety. Temp. Race Street: Remove the temporary Race Street structure south of the south line of Freedom Way West to prepare for future development and access; and thus any potential public safety issue related to the abandoned structure. Current structure is not compatible with grades necessary to meet planned access points.~|~04 - Reconstruction - No Added Capacity~|~DF83E31EAD72B76738ADCF0FFA558F1BA86A9C92 86444~|~2~|~2~|~02/S>2~|~State reimbursement for BP #6~|~04 - Reconstruction - No Added Capacity~|~EC4757D7CAD20670C9AB989104A89322BEEA123F 103445~|~1~|~1~|~01/STR~|~Landslide repair. NOB 146 17.43. Work length approximately 290 ft. DSR NOB-006.~|~~|~65AD03B7CD4CF4EE10A93B9B9F151F72929204C7 114447~|~1~|~1~|~01/STR~|~Resurfacing SR 152~|~05 - 4R Maintenance - Resurfacing~|~4438ECA7BAA05B68C700B9511194E140E0796F04 108832~|~1~|~1~|~01/STR~|~Tree removal.~|~44 - Other~|~5E51F870C8942E7FB16BC4970C73B09CC705A910 98496~|~1~|~1~|~01/STR~|~Work on SR 103. District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~2B44AF26822D5C7C4FFAACA8E5147B26B2FA38F2 98496~|~1~|~2~|~02/NFA~|~Work on SR 698. This route is a Rural Minor Collector and is NOT eligible to use Federal funds.~|~05 - 4R Maintenance - Resurfacing~|~4CECDB23DB6B8733FFB6A505D5860A9CE3B101DA 114056~|~1~|~1~|~01/NHS~|~Safety Funding Eligible~|~21 - Safety~|~73235660E7DAD2F078C94E93B473B9CF575B7222 114056~|~1~|~2~|~02/SAF~|~Additional Sidewalk Work~|~44 - Other~|~07C2AABCD6A9E752FBDE0AC6AEF1546B8C45C098 114056~|~1~|~3~|~03/ENH~|~100% Local Items~|~44 - Other~|~7D7A116B689FE8075406EA304B83F466B4B29438 81253~|~1~|~3~|~03/IMS~|~"03/IMS/PV/ " - District Preservation-Pavement Marking 4MP7 (100% State) - No CAP - Pavement Markings on: 1) Lic-IR 70-28.66 to 28.93; 2) Mus-IR 70-00.00 to 01.46; 3) Lic-IR 70-28.93 to 29.16;~|~05 - 4R Maintenance - Resurfacing~|~4E1AB33CAE2DFE4D8B0C473F1F7EC39C8A60E6EB 81253~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Bridge replacement on 1) 4504534 LIC IR70 28.88 Intersect: IR70 Over Valley Run; Not BR Eligible for Replacement: Length=69' SD/FO(1) SR=63.2 DSR=6 2) 4504569 LIC IR70 28.88 Intersect: IR70 Over Valley Run ; Not BR Eligible for Replacement: Length=99' SD/FO(1) SR=63.2 DSR=6~|~10 - Bridge Replacement~|~7CA1C2BAB512C853CE0A1294BFDDCC13D2CFFEB7 81253~|~1~|~2~|~02/IMS~|~"02/IMS/PV/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP - Resurfacing of: 1) Lic-IR 70-28.66 to 28.93; 2) Mus-IR 70-00.00 to 01.46; 3) Lic-IR 70-28.93 to 29.16;~|~05 - 4R Maintenance - Resurfacing~|~FAAD81739CF616C05EDC2B1D0006DA55E5AE4454 94389~|~1~|~1~|~01/NFA~|~General System Resurfacing- Not on Federal Aid Sysytem~|~05 - 4R Maintenance - Resurfacing~|~129B486E763C2092A4DC37CB473A50DC719D654A 94389~|~1~|~2~|~02/NFA~|~Bridge work MED-606-3.82 SFN:5208130~|~47 - Bridge Preventive Maintenance~|~1F19987899657E2346B5AF9509A0627B0FAD37AA 109323~|~1~|~1~|~01/STR~|~Slide Repair DSR# LAW-003LAW CR 3.53~|~04 - Reconstruction - No Added Capacity~|~3EABCA98FB78A8E79EBEF6E04C30B9DC384796CD 100578~|~1~|~1~|~01/STR~|~JAC 93 (0.00-6.33)~|~05 - 4R Maintenance - Resurfacing~|~C88089B47FD473F964BB16840B3DAC6DC2CEEB32 77270~|~1~|~1~|~01/IMS~|~Reconstruct the interchange of IR-76/IR-77 with SR 8/IR-77, in the City of Akron, Summit County, Ohio. ~|~~|~EE7127405957FCC1811F5BB9C4D1A5EB8923D2B4 105691~|~1~|~1~|~01/STR~|~This plan split uses federal and state funds from the Geologic Site Management (GSM) program and the District Preservation Program. The GMS funds are to be used first.~|~04 - Reconstruction - No Added Capacity~|~8ED66F8B0E17ACFED009F03B5DFD6310DA100734 97260~|~1~|~1~|~01/STR~|~Bridge deck replacement project. GAL 141 12.46, SFN 2701685. Work includes abutment repair. Rural other federal aid funded 80 federal/20 state.~|~13 - Bridge Rehabilitation~|~D260C6345EBA0BEB951818DD5C4AFC43914BD9C9 88656~|~1~|~2~|~02/NHS~|~FY2014 Urban Paving in the City of Cincinnati on US 42 US 27, US 27D, and US 52. This Plan Split is for the NHS portion on US 27 between SLM 7.16-9.19. This Planning Split is for the items paid at 100% City; mainly consists of pavement repair, MOT striping, utility work, curb & gutter, and curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~0EA874BF8F12E864FFBD3D6F1BCE8EF2C6D7F8CA 88656~|~1~|~1~|~01/NHS~|~FY2014 Urban Paving in the City of Cincinnati on US 42 US 27, US 27D, and US 52. This Plan Split is for the NHS portion on US 27 between SLM 7.16-9.19. This Planning Split is for the items paid at 80% ODOT and 20% City; mainly consists of planing, new asphalt overlay and final striping. ~|~05 - 4R Maintenance - Resurfacing~|~4BAF15D4EDC8E63036823E2271FB92622F3BB908 113567~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~897E576BB1E1A358B5B348D0229A51B45F11AE5D 100307~|~1~|~1~|~01/STR~|~Fine graded polymer AC Overlay to POR SR 225 from 5.24 to 10.26.~|~05 - 4R Maintenance - Resurfacing~|~2D2A5F9F54ECFB0DE4FABB9B6C209242F630E708 119775~|~1~|~1~|~01/NFA~|~added plan split.~|~10 - Bridge Replacement~|~DFD18C8174AA3F495D6B182B4C22665AF0172752 109993~|~1~|~1~|~01/STR~|~Rural Plan Split: MAD-62-1.45-2.39, MAD-62D-0.00-1.10, MAD-207-1.15-1.39 & MAD-56-23.01-23.89~|~05 - 4R Maintenance - Resurfacing~|~5558C5453A5AE522BD40CDA8BE1A0DD4CC7F94E5 101108~|~1~|~1~|~01/STR~|~AC overlay without repairs on rural route: DAR US 127 SLM 22.26 to 25.30~|~05 - 4R Maintenance - Resurfacing~|~630272D497421E66696E29BFF99AEE6A0FC94744 103960~|~1~|~1~|~01/S>2~|~Old 74 Overpass~|~~|~130D6E2259DC671F681E3A77A4C188B0C4F30AA2 112902~|~1~|~1~|~01/STR~|~Culvert replacement~|~04 - Reconstruction - No Added Capacity~|~B189E646D6D3A6D1FD676AEC34EBA11CE3E3D39C 123578~|~1~|~1~|~01/NHS~|~Plan Split for pavement Maintenace on NHS route~|~05 - 4R Maintenance - Resurfacing~|~35DCAA63647471D2A14449496B6127E134AD7CBF 117136~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~17 - Construction Engineering~|~5DCF98146DDEF0678A31240D636F32005E668E30 83700~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~4822D246276A29E373BB3DA4736306B6FCDF3680 110487~|~1~|~1~|~01/MPO~|~Signalization of the intersection which qualifies of federal-aid~|~21 - Safety~|~823C0A67ADC3FAB3256886C14C23CCE38ADE5307 116775~|~1~|~1~|~01/STR~|~Guardrail Repairs.~|~44 - Other~|~235F931F3CFAB1C0B48D00E8B0B3264BCF28386A 112624~|~1~|~1~|~01/MPO~|~Resurfacing South Ave from Presidential Dr to Mathews Rd.~|~05 - 4R Maintenance - Resurfacing~|~5258FD77011373FE186EE5355CC928058794A42F 114088~|~1~|~1~|~01/NFA~|~ Created for possible J&C involvement~|~44 - Other~|~23DC52B15F947E03C00C93AFFBC5A117DD6A6F5D 89030~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split utilizing MPO CMAQ, MPO Transit, and STP funding.~|~44 - Other~|~6A77FE59E8B69F21C6C6A68DE32C0FB384A710BB 89030~|~1~|~2~|~02/ENH~|~80/20 MPO/local funding split for enhancement work.~|~31 - Landscaping & Other Scenic Beautification~|~837B1A7883A39F3408ADFCCE1F3F4F3ABB9DE849 89030~|~1~|~3~|~03/S>2~|~100% local funding~|~17 - Construction Engineering~|~8788FFE95E05E02CE1F8B41607AE4606EABFA1B9 122958~|~1~|~1~|~01/NFA/HEBR~|~Pedestrian path along Canal Rd in the Village of Hebron.~|~28 - Facilities for Pedestrians & Bicycles~|~2371E448DCE6FFD3F7D505C9DCFA99DA5D9B6CC9 96460~|~1~|~2~|~02/NHS~|~100% local for work not eligible for state funding as well as for cost above the urban resurfacing funding.~|~05 - 4R Maintenance - Resurfacing~|~0354EFC71A87857E68E107D0C8B818B97522FEDC 96460~|~1~|~1~|~01/NHS~|~80/20 state/local funding split~|~05 - 4R Maintenance - Resurfacing~|~F3193B30B0D4D8288F6863AA83A8A60704117E66 125822~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment.~|~05 - 4R Maintenance - Resurfacing~|~088EEA423A4322E02010313E7B3A5E61ADC7F634 101829~|~1~|~1~|~01/STR~|~Pavement marking project using HSIP funds (100% Federal) on MEG CR 14 0.00-1.14.~|~21 - Safety~|~976F1A58E2513265250F3BB0CC0C9FCDDF35923D 91749~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using a microsurfacing treatment. MOE 78 23.50-32.26. Rural other federal aid funded Federal 80% and State 20%.~|~05 - 4R Maintenance - Resurfacing~|~456B22ACD22B561E08872DB808F7803656C3FB4A 109101~|~1~|~1~|~01/STR~|~Landslide repair project. MOE 536 10.54. 100% State ER funded.~|~~|~4EA5BED4F615224D8F450D734E854EE35FC34A69 101741~|~1~|~1~|~01/NFP~|~Drainage repair and maintainance areas that accepts drainage from the Ohio Turnpke in the City of North Royalton between York Road and Bennett Road.~|~04 - Reconstruction - No Added Capacity~|~1B13246AE0223FE5664A7B7BC715C5013B7A4B17 127266~|~1~|~1~|~01/S>2~|~plan split for urban paving project.~|~05 - 4R Maintenance - Resurfacing~|~8543132E8F28C882DE801EB1313DE3555AD65539 127266~|~2~|~2~|~02/S>2~|~Plan split for non-urban paving portion.~|~05 - 4R Maintenance - Resurfacing~|~005729E9562D674B911A7F7E7930109F3CC544D2 103708~|~1~|~1~|~01/S<2~|~SCI 140 2.16-2.20 Safety project~|~21 - Safety~|~6092987BDA354F6210116A09B62A1282D3E8842D 98560~|~1~|~1~|~01/STR~|~Plan split for all pavement work related to resurfacing the entire SR 726 in Preble County~|~~|~7698FB6056D2710FDF19407DBB202DBD0C64B9F5 110821~|~1~|~1~|~01/NFP~|~Project to Chip Seal Urbana Wildlife Area for ODNR Roadway Maintenance Program~|~44 - Other~|~93ABBB9EE299CE06C27127A39F4F9DB962C4951F 92893~|~1~|~2~|~02/S<2~|~100% City of Wooster~|~~|~15887A6E7C72E31C5621DF2CCA2910909BF5693F 92893~|~1~|~1~|~01/S<2~|~Urban Paving - 80/20 - District Allocation/City of Wooster~|~~|~AEBD1CDEA3F32D052051AA44D968D57A0469C36A 112974~|~1~|~1~|~01/IMS~|~Paint the Ohio approach bridges to the Brent Spence Bridge. Plan Split 1 for Major Bridge funded locations on 3 bridges.~|~47 - Bridge Preventive Maintenance~|~A14A68B5D09CD964B89488D97C514B2A13FFF845 112974~|~1~|~2~|~02/IMS~|~Paint the Ohio approach bridges to the Brent Spence Bridge. Plan Split 2 for District funded location on 1 bridge: HAM-75-0022L.~|~47 - Bridge Preventive Maintenance~|~C55AE7081858710CD97AAFA74DD0FA326DD2CBD3 96664~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay with repair treatment. NOB 566 0.00-1.59. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~8FCE463537EAD696F280B5DA2A8EB78789909182 96664~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay with repair treatment. NOB 566 1.59-4.80. Not on any federal aid system funded 100% state.~|~~|~545D87FB859C898F5C3DC77E07957949C2E0194C 119000~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~C04DDFACCB784758EC84C7FFFA8A1704D3D94C91 92685~|~1~|~1~|~01/S<2~|~Work on SR 15 in Defiance County from the beginning of the project at the corportation limits of the City of Defiance at 17.01 to the Defiance Area Urban Area boundary at 17.65. Work is inside the Defiance Urban Area but outside the City of Defiance. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~62EA71E77870C4EE3FF14E578808CBF2BE67ED8D 92685~|~1~|~2~|~02/STR~|~Work on SR 15 in Defiance County from the Defiance Urban Area boundary at 17.65 to the end of the project at county line at 24.33. Work on SR 111 in Paulding County from US 127 at 16.37 to SR 637 at 21.96. Work on SR 634 from SR 613 at 15.43 to the north corporation limits of the Village of Continental at 16.43. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~CC22E0FCDD2BABE554E6333D23CA508091F6A2A0 103016~|~1~|~4~|~04/NHS~|~Bridge work on:ASD-250-1391 SFN 0304824ASD-250-1408 SFN 0304832~|~13 - Bridge Rehabilitation~|~BEF6FA1F96D21E5D626DA553D7DC3EB755D4A39E 103016~|~1~|~1~|~01/NHS~|~Federal 80%/Local 20% NHS Inside Corp. Limit (Paving Items):ASD SR 0250 SLM 12.22 TO 12.27(RT), SLM 12.50 TO 12.58(RT),SLM 12.72 TO 13.10, SLM13.48 TO 14.97.~|~05 - 4R Maintenance - Resurfacing~|~4488A6F5DA1F8CF39138592E91616FB389BEEC72 103016~|~1~|~2~|~02/NHS~|~100% Local (Ashland):NHS Inside Corp. Limit (Items Such as Pavement Repairs, etc.):ASD SR 0250 SLM 12.22 TO 12.27(RT), SLM 12.50 TO 12.58(RT),SLM 12.72 TO 13.10, SLM13.48 TO 14.97.~|~05 - 4R Maintenance - Resurfacing~|~B531ED61013CDC4B1B8F1B00DABBFE2D36BF5666 103016~|~1~|~5~|~05/S<2~|~Federal 80%/Local 20% Urbanized Area Inside Corp. Limit (Paving Items): ASD SR 0058 SLM 0.000 to 0.570(LT), SLM 0.000 to 0.610(RT)~|~05 - 4R Maintenance - Resurfacing~|~094227B41559FFF1D296E9271D5A787A55E4FE4C 103016~|~1~|~3~|~03/NHS~|~NHS: ASD-250-12.22-14.97 80/20 Fed/StateDistrict Allocation Federal/State: NHS Outside Corp. Limit (Paving Items Etc?): ASD-SR-0250 ? SLM 12.22 to 12.27 (LT), SLM 12.27 to 12.50, SLM 12.50 to 12.58 (LT), SLM 12.58 to 12.72, SLM 13.10 to 13.48, ~|~05 - 4R Maintenance - Resurfacing~|~74BBC4E62031830D7F68E6B5B1DEF16F341B28A1 103016~|~1~|~6~|~06/S<2~|~100% Local (Ashland): Urbanized Area Inside Corp. Limit (Items Such as Pavement Repairs, etc.): ASD SR 0058:SLM 0.000 to 0.610~|~05 - 4R Maintenance - Resurfacing~|~63CA584A9CE7A21DC4B7F3CC3E478FDB6F54588C 102889~|~1~|~1~|~01/STR~|~LAW 378 2.21 Culvert Liner~|~~|~10F5FC599EBA6CF894D89D449A28451091C9184E 126907~|~1~|~1~|~01/SAF~|~PM on various county routes. ~|~21 - Safety~|~4A4CB33F4B983431941ADDD63187E5FC5A44157F 84649~|~1~|~2~|~02/NHS~|~ROS US23 16.36 - 22.20 Resurfacing ProjectBrdgs F/Rehab:7101112 ROS US23 19.42 Intersect: Kinnikinnick Creek7101147 ROS US23 19.42 Intersect: Kinnikinnick Creek7101171 ROS US23 21.05 Intersect: Blackwater Creek7101201 ROS US23 21.05 Intersect: Blackwater Creek7101236 ROS CR280 22.19 Intersect: Co Rd 280Skip 7102194 US35 80/20 split02/NHS/BR/State~|~13 - Bridge Rehabilitation~|~3C5EFC2A8B74B7CAD1B6F01F4A2F224353632943 84649~|~1~|~1~|~01/NHS~|~ROS US23 16.36 - 22.20 Resurfacing ProjectOn US23 beginning 0.28 mile north of the ramp from SR159 (SLM 16.36) north for 5.84 miles and terminate at the Picaway Coutny Line (SLM 22.20) it is proposed to resurface the 4-Lane Highway80/20 split01/NHS/PV/State~|~05 - 4R Maintenance - Resurfacing~|~8AFDCAEFB8D8808FBF3CF9434A0F1D66C96A5A9C 115728~|~1~|~1~|~01/NHS~|~"01/NHS/BR/ " - 80% Federal (4PF7) and 20% State (4PS7) - rehabilitation of LIC SR 13 22.20 (SFN 4500520) carrying SR 13 over North Fork Licking River~|~13 - Bridge Rehabilitation~|~24F70E27D8AA6F0CCFC98B10DA57D20D8DC8972A 119266~|~1~|~1~|~01/IMS~|~Mowing~|~44 - Other~|~6CA1141EE3E9F79D8F3BD79D5587778F8C6A3E68 114232~|~1~|~1~|~01/NFA~|~Resurfacing project on MOE CR 28 0.00-3.72. Funded through the Local Roads Oil and Shale Program.~|~05 - 4R Maintenance - Resurfacing~|~60EF6CFCCDF7F7EBAD4A05B97654B2197E756BC6 96996~|~1~|~1~|~01/ENH/EL~|~Construction of streetscape in East Liverpool on East 4th Street from Washington St. to approx. 150' east of Walnut St.; Transportation Alternative Program funded items at 80% federal.~|~44 - Other~|~C71336B098C66AE2F3337B0A29F040F39E4E7002 96364~|~1~|~1~|~01/IMS~|~Flood entire decks with SRS~|~05 - 4R Maintenance - Resurfacing~|~368433982F9FF5F247744420EAAAD5B10E60D04D 96364~|~1~|~3~|~03/STR~|~Flood entire decks with SRS~|~05 - 4R Maintenance - Resurfacing~|~7E4B493103CC7591A5B6626FEAC02F1F41E06C2B 96364~|~1~|~4~|~04/S<2~|~Flood entire deck with SRS~|~05 - 4R Maintenance - Resurfacing~|~7DB726180CF4FA40FEBF1BDF38171D9CBA5CF6B9 96364~|~1~|~2~|~02/NHS~|~Flood entire decks with SRS~|~05 - 4R Maintenance - Resurfacing~|~00AB175A4FC37E981EA2C5787C37E7D85580C9F4 122954~|~1~|~1~|~01/NFA~|~Created for J&C involvement. ~|~44 - Other~|~035D8B6B642A2AA7FB0AEF29744598F0D40951BE 107478~|~1~|~2~|~02/S5K~|~Resurfacing LOR SR 611 0.52 TO 1.203 / LOR SR 611D 0.63 to 0.495AC Overlay w/Rpr~|~05 - 4R Maintenance - Resurfacing~|~808D967BF8A6E7B53CAD22AD36E3E43A3907D119 107478~|~1~|~1~|~01/NHS~|~Resurfacing: LOR SR 611 1.203 TO 04.250 AC Overlay w/Rpr~|~05 - 4R Maintenance - Resurfacing~|~5981EE4E450764A09E50B362E0841527E55992C7 107478~|~1~|~5~|~05/SAF~|~LOR-611 road diet and curb ramps. ~|~21 - Safety~|~9B3D35804D36A7FD62887253153F38D6A52E3124 107478~|~1~|~4~|~04/S5K~|~LOR SR 611 0.052 to 1.203 / LOR SR 611D 0.063 to 0.495 pavement repairs, castings reconstructed to grade, and concrete pavement work.~|~05 - 4R Maintenance - Resurfacing~|~E18487E9311E3103C5FDA18F94A78882DA800FEA 107478~|~1~|~3~|~03/NHS~|~LOR SR 611 1.203 TO 4.250 pavement repairs, castings reconstructed to grade, and concrete pavement work.~|~05 - 4R Maintenance - Resurfacing~|~04B49A1BF64E71AE5A374A589970F275F74D5D31 91813~|~3~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Replacement of: 1) 3004805 GUE SR265 9.45 Intersect: Over Br Leatherwood Creek: BR Eligible Length = 20' SD/FO(1) SFR=21.3 DSR=4;~|~10 - Bridge Replacement~|~1F48326D3CA83FFAC25C9D4171EAE0F7618C7ECD 91813~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(Federal 80%) / 4PS7(State 20%) - No CAP - Replacement of: 1) 3004740 GUE SR265 7.29 Intersect: Over Br Leatherwood Creek: BR Eligible Length = 24' SD/FO(1) SFR=30.9 DSR=4;~|~10 - Bridge Replacement~|~7E2D480CE7D67B107C30ABF2546A5C59E49172C4 91813~|~2~|~2~|~02/STR~|~"02/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 3004775 GUE SR265 8.61 Intersect: SR 265 Over Ditch; Not BR Eligible for Replacement or Rehabilitation: Length=18 SD/FO(0) SR=23.4 DSR=4~|~10 - Bridge Replacement~|~AB34BD8FE25CB41A3F0A30DB5EE4F47E1DCBE8F0 123801~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~A667CD596BE6B04FCD2189F458BA2BD318B7C823 124453~|~1~|~1~|~01/SAF~|~Installing sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~E9775ADC6C4F09702ADE622E0A4072E53948F5FC 25655~|~1~|~3~|~03/STR~|~Bridge Work~|~13 - Bridge Rehabilitation~|~11B8AFB0A1446ACF75AD7290DE29FE87B663B7F0 25655~|~1~|~2~|~02/S<2~|~District Allcoation Resurfacing WAY-261-08.47 - 09.31 Urbanized Area~|~05 - 4R Maintenance - Resurfacing~|~A133E152FA3FCAA26D42BE5034E1109DDE3648DD 25655~|~1~|~1~|~01/STR~|~District Allocation Resurfacing WAY-226-00.91 - 08.47 Rural~|~05 - 4R Maintenance - Resurfacing~|~FA212A52F42DE2DB767A873FB91256AB13DBF7F5 97167~|~1~|~1~|~01/SAF~|~Safety funding for signal, ped facilities, and EB RTL at Innis and SR-3~|~21 - Safety~|~B2B8816523389B1275F2BD5FB9FB30E17405ECE6 100908~|~1~|~1~|~01/SAF~|~Construct an over-height detection and warning system~|~~|~335E9CC8F6447455F51F4112511FB6303825C8D5 106317~|~1~|~1~|~01/NFP~|~Crack sealing of various routes throughout district 4.~|~99 - State Preventative Maintenance~|~9BBD6DFE77155FAE3F7FDF212101A002FC5A8C6F 112172~|~1~|~1~|~01/BRF~|~Replacement of the existing bridge (SFN: 6842380) that carries Geeding Street over Sams Creek.~|~10 - Bridge Replacement~|~0970CC73D1B3D63B056324A00BDD3259A29DCAFC 104975~|~1~|~1~|~01/STR~|~Rockfall hazard remediation, GAL 141 8.85. GSM funded. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~A23F8CB1C3366A2B738BFB60441D0C1CC18D12AF 122317~|~1~|~1~|~01/S>2~|~Construct Noise Wall~|~20 - Environmental Only~|~0CC58F3F8F2230A69B3DCED5BC60465F82BCC4FE 101292~|~1~|~2~|~02/NHS~|~SAN-53 from 11.40 to 11.75 in corp.~|~05 - 4R Maintenance - Resurfacing~|~41454591A67E965B51170D1D197FB30E69996A44 101292~|~1~|~1~|~01/NHS~|~For SR-53 piece not in city corp (SLM 11.75 to 12.95).~|~05 - 4R Maintenance - Resurfacing~|~62617395FE801B7A3A01AF20B779C396C775C708 118738~|~1~|~1~|~01/NFA~|~NOB-CR-40-2.41 SFN 6130437~|~10 - Bridge Replacement~|~8B1DAD21413836CD45258E64699DB90AEBED174C 87309~|~1~|~2~|~02/S<2~|~Resurfacing of SR 416 in the Dover-New Philadelphia urban area from SLM 3.85 to 4.63.~|~05 - 4R Maintenance - Resurfacing~|~63DFDA2A539F1FFDEBF3EF6D623389FF5CB988BC 87309~|~1~|~1~|~01/STR~|~Resurfacing on SR 416 near the Dover-New Philadelphia urban area from SLM 0.00 to 3.85.~|~05 - 4R Maintenance - Resurfacing~|~707FB718F75078392C17F107AEBF94BBD94C88AF 112063~|~1~|~1~|~01/SAF~|~Split 1 for eligible work for the interchange reconfiguation~|~21 - Safety~|~9678F42B9D80F5F8E01A4BD42188817A09EB7778 112063~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~FC1A4905D9A0D27F2771976D0633400FC2E0F336 105556~|~1~|~2~|~02/ENH/PCPD~|~Relocating the Portage Hike & Bike Trail from Ravenna Road on the railroad bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~E5B1C8FC85D31F3A8F551BC111D3C3CF8F8F8881 105556~|~1~|~1~|~01/BRO~|~Structure replacement.~|~10 - Bridge Replacement~|~43DF0B15FE059739AB3E37A4452E4DB404D337FF 117780~|~1~|~1~|~01/NFA~|~Created Plan Split for J&C involvement~|~44 - Other~|~6A7722D2F7FFEAB97FA161DB2EAE3ED06753EC66 84440~|~1~|~1~|~01/BRF~|~It is proposed the replace the deficient structure, SFN 0803243. Project Termini: Project is on SR286, 0.35 mile from its intersections with CR87, Bodman Road. 0803243 BRO SR286 4.6 Intersect: Five Mile CreekThis is a non federal aid system but it is BR eligible. 80% Fed/20% state01/BRF/BR/State~|~10 - Bridge Replacement~|~B21DAB7F85BFA32B849017E7D0BE6361E9C1AADD 126420~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay without RepairLOR-252-0.00 to 2.648Fine Graded Polymer Asphalt Concrete OverlayLOR-252-2.648 to 2.651~|~05 - 4R Maintenance - Resurfacing~|~9DFEC408C7C69A73204D1A8499A0B1F904F6D3B0 126420~|~1~|~2~|~02/S>2~|~Fine Graded Polymer Asphalt Concrete OverlayLOR 252-2.651 to 5.542~|~05 - 4R Maintenance - Resurfacing~|~CBB53A85F0F19157C01C3525A5E5ECDC3B039EC3 106688~|~1~|~1~|~01/ENH~|~Construct 5 foot bike lanes on SR 416~|~44 - Other~|~BC8092BC982F74FB2844AD74A08DE0B1439C1F55 101244~|~1~|~1~|~01/NFP~|~District Maintenance Funding 4CP7 (100% State) - No CAP - District Wide Contract for guardrail repair.~|~44 - Other~|~E3B73796B8F19A6BDDA5DA67833F1680D673C058 84401~|~1~|~1~|~01/NHS~|~80/20 federal/local split for all Urban Paving eligible work.~|~05 - 4R Maintenance - Resurfacing~|~EA5A51DA048A52B910FB4F257C08C8C3AE084315 84401~|~1~|~2~|~02/NHS~|~100% local participation items of work such as curb ramps, etc.~|~05 - 4R Maintenance - Resurfacing~|~A50929E7DBC9DFA9F23824B23C87A7B05763FABE 116388~|~1~|~1~|~01/NHS~|~JEF-7~|~05 - 4R Maintenance - Resurfacing~|~A4EBA2BE11A07335685A1BCB1F784EEA5ADD2128 105418~|~1~|~1~|~01/IMS~|~Plan Split for bridges FRA-23D-4.41 and FRA-71-17.47~|~10 - Bridge Replacement~|~39DDD6BB94B318686DE126856D42253A10DEE7DD 102681~|~1~|~1~|~01/NFA~|~Traffic signal improvements, a new pedestrian crossing on the north left of the intersection at Summit street and Madison Ave. Widen Jefferson Ave to provide one eastbound lane and two westbound lanes between Summit St and Water St.~|~01 - New Construction~|~200CBB15B9A529211A93F2072B39A58FB4DD974D 98507~|~1~|~1~|~01/IMS~|~This funding event is for the sealing of all interstate bridges.~|~13 - Bridge Rehabilitation~|~771586C95FDA58E4D8AE992E4E063CA08C7A5911 98507~|~1~|~2~|~02/NHS~|~Bridge sealing~|~13 - Bridge Rehabilitation~|~62AB47D259A16D9FC48A593B41E88D293D6A8674 110763~|~1~|~1~|~01/SAF~|~Resurfacing of Capel Rd~|~21 - Safety~|~D86672B80727B995421D9BA25905B8661D6B0662 110763~|~1~|~2~|~02/NFA~|~Plan split for bridge rehabilitation at 100% Local Cost~|~13 - Bridge Rehabilitation~|~F0F86252BFD0E06533E04E532605376F8080F088 105195~|~1~|~1~|~01/NHS~|~Plan Split for concrete pavement repair on GRE-444.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~72C7F385D47496F6475FBA2B88B56D82AFE04462 100840~|~1~|~1~|~01/NHS~|~BRO 62 8.38-11.76~|~05 - 4R Maintenance - Resurfacing~|~041A425B3694EC3052DEDF2826CAAD13EAF4CEC0 98488~|~1~|~1~|~01/STR~|~STP Rural Pavement: RIC-546-0.00-8.37~|~05 - 4R Maintenance - Resurfacing~|~4B18CFD1F696260C018CA7EEDDC7814C7D79C1C2 98488~|~1~|~2~|~02/S<2~|~STP < 200000 Pavement: RIC-546-8.37-9.28~|~05 - 4R Maintenance - Resurfacing~|~AC53A507F064C297229ECF81A2F3799B11D58B08 120197~|~1~|~1~|~01/NFA~|~Resurfacing project utilizing Local Roads Oil & Shale (State) funds at 100% up to project CAP.~|~05 - 4R Maintenance - Resurfacing~|~41B967334CFA2937A97324BB915BB2666FFBF202 127048~|~1~|~1~|~01/SAF~|~Install sidewalk on both sides of Springdale Rd (CR-96) in Colerain Township from just east of Loralinda Dr (TR-129B) to just east of Menominee Dr (TR-223B).~|~28 - Facilities for Pedestrians & Bicycles~|~2F9294BFC3C6513D9EFCB049FD540CF63491CA2F 118731~|~1~|~1~|~01/S>2/TRCE~|~Bridge rehabilitation.~|~13 - Bridge Rehabilitation~|~2661CFDAFC94BDA4D160EC7B03ABE7E695A426A5 90848~|~1~|~1~|~01/S>2~|~Roebling Suspension Bridge Pedestrian Connection: Provide ADA compliance by providing an accessible route on the upstream side of the Suspension Bridge between Covington and Ted Berry Way. Move the location of the existing stairs north of old Mehring Way. Construct sidewalk on the bridge from the termination of the old stairs to Ted Berry Way and the upper level of the Walnut Street Stairs and fountain. Reconstruct the stairs into Lot 12 and Mehring Way. *ADA route to utilize elevator to be constructed under a separate contract.; Ohio River Trail: Construct portion of the ORT between Broadway and Elm Street.; Broadway Pedestrian Connection: Remove and replace the existing stairs from the intersection of Broadway and Pete Rose Way to the existing elevated pedestrian walkway.~|~28 - Facilities for Pedestrians & Bicycles~|~9D6FCE3663B98CC14DCBF0240407C5290788EE9F 90848~|~2~|~2~|~02/NFA~|~Any 100% Local items~|~28 - Facilities for Pedestrians & Bicycles~|~F6AA15F19880292C78895616AC105B36B9D43409 97318~|~1~|~1~|~01/STR~|~SCI CR VAR GR FY19~|~21 - Safety~|~9F9BC083D8B15D6B24C3A41AC04E1B955E5A1291 110037~|~1~|~1~|~01/S<2~|~Paving in BG Urbanized area Woo 25 11.92 to 13.64~|~05 - 4R Maintenance - Resurfacing~|~D6CEB798044328305D693DBA5BD4D03AE2A3786E 110037~|~1~|~2~|~02/STR~|~Paving in Rural area for SR 25 13.64 to 15.89~|~05 - 4R Maintenance - Resurfacing~|~CEBA740CD4867B9C0A5438C903A047F1DC74B654 110037~|~2~|~3~|~03/STR~|~Retro Fuel Price Adjustment~|~05 - 4R Maintenance - Resurfacing~|~DAF087F4CDAB82E3881143ADE9F7A86F3DE6CA42 94292~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation Bridge Funds 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on SFN 4202104 KNO US 62 14.28 over the Kokosing River. Not BR Eligible for rehabilitation Length = 327; SD/FO = 0; SR = 83.6; and DSR=5:~|~10 - Bridge Replacement~|~D563DF2D1D505253C7CC26B12C7435A3F96AAB9D 116205~|~1~|~2~|~02/NHS~|~Plan split for resurfacing work on SR-795 from SLM 2.129 to 2.26~|~05 - 4R Maintenance - Resurfacing~|~50DFFBCE2FB879702DC0008D1D3BE157EA3FD578 116205~|~1~|~3~|~03/S>2~|~Plan split for resurfacing on SR-795 from SLM 1.76 to 2.129~|~05 - 4R Maintenance - Resurfacing~|~1E5DA44329C2535C71DC82FDCE69E62A36357434 116205~|~1~|~1~|~01/BRO~|~Plan split for work on WOO-795-0227 bridge~|~47 - Bridge Preventive Maintenance~|~693D282F1C32CF885704E742B5F3A23244C93C1B 110473~|~1~|~1~|~01/NHS~|~Signal upgrade at US 23 (11.43) & SR 348.~|~21 - Safety~|~F0A453C79B068BA5BC452A66257CD4036AF0CF8E 107703~|~1~|~1~|~01/STR~|~Resurfacing on SR 500 using district preservation funds (80% 4PF7 and 20% 4PS7).~|~05 - 4R Maintenance - Resurfacing~|~001C901C4B7A31FE5564D621DB16645F8D6E9B2B 93318~|~1~|~1~|~01/IMS~|~Replace deficient bridge deck with minimal approach transitions. Structure part of I 75/US 35 interchange. Project to remove structural and functional deficiencies on SFN 5707404 MOT 75 1164E on Albany Street Ramp (IR 75 North - US 35 East).~|~13 - Bridge Rehabilitation~|~F5BA96F189E35C31B0349C497180CFD0D3A5B0B5 117419~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~746BFC70A725DD32CEB020772DA49C2E7E54881C 100940~|~1~|~1~|~01/STR~|~Ac Overlay on rural route: MER SR 118 SLM 15.20 to 17.97~|~05 - 4R Maintenance - Resurfacing~|~387230F5F6BD79E519EB4D9B463ABCEC1F51D671 100940~|~1~|~2~|~02/S<2~|~AC Overlay on sm urban route: MER SR 118 SLM 14.42 to 15.20~|~05 - 4R Maintenance - Resurfacing~|~B57536FE02C3F3F04FE846F8C62C2D79CFAA9A78 100940~|~1~|~3~|~03/SAF~|~Add center line rumble strips as Safety measure.~|~21 - Safety~|~4C808BE5B56D0E599B1A4523DCEAFFFCC290E3B2 89248~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~9A7E1E7DFA1664627998ECA61BD595FC138C860E 89248~|~1~|~4~|~04/NFP~|~Split for 100% local items~|~05 - 4R Maintenance - Resurfacing~|~30A247A9A92AE7DC74ED8DCA17791FEC060F2933 89248~|~1~|~3~|~03/MPO~|~Split for TLCI work~|~05 - 4R Maintenance - Resurfacing~|~79B3976AD4DB2A63D94676C5CA89C31C28874FAD 89248~|~1~|~2~|~02/SAF~|~road diet on Lorain Ave from West 117th to West 65th which includes resurfacing, turn lanes, adding back plates, and reconstructing signals that is eligible for federal-aid~|~05 - 4R Maintenance - Resurfacing~|~8FF48163E5A49853E0E579D1D500A7BBED4C04FB 99701~|~1~|~1~|~01/NFP~|~Spot paving of various routes in Ashtabula, Mahoning, and Trumbull counties.~|~05 - 4R Maintenance - Resurfacing~|~8234D0538C6899B619A41DFD6E0444CC8081AB9F 92230~|~1~|~1~|~01/NFP~|~state funding for work on 6 structures2102498 DEL IR71 13.07 Intersect: Under C34 North Galena Rd2102552 DEL IR71 15.63 Intersect: Under Kilbourne Rd.Cr655901448 MRW IR71 10.57 Intersect: Under (Card-Chesterville)2103540 DEL SR521 9.93 Intersect: Over I-715900964 MRW IR71 0.4 Intersect: Under W. Lib-Mt.Vern Rd5902703 MRW SR229 5.5 Intersect: Over I-71~|~13 - Bridge Rehabilitation~|~77B4BADFFC838259043C8FA48E31DBF618E22D0B 92230~|~1~|~2~|~02/IMS~|~Replacement of Arrow board damaged by motorist.~|~13 - Bridge Rehabilitation~|~ED75536E96FE7B2EB3E2A815398600A780781BF2 114742~|~1~|~1~|~01/STR~|~PIK Chipseal.~|~05 - 4R Maintenance - Resurfacing~|~0D43C9B6F3F0541AE06FF32318B3B73045105D20 110489~|~1~|~1~|~01/NFP~|~Sign replacements on various routes throughout District 4.~|~21 - Safety~|~46DF5F123778AAF598F5356174532C427FEFAB82 110489~|~1~|~2~|~02/NFP~|~Replacing a sign truss on TRU 80 3.32.~|~21 - Safety~|~D1458E8802D2B7D532899DE362F5DF71035FC0F5 100188~|~1~|~1~|~01/CMQ~|~Construction of the Great Miami River Trail from the current terminus of SR-73 to the Butler/Warren County Line. Split covers the project work within the City of Middletown.~|~28 - Facilities for Pedestrians & Bicycles~|~9ADD2F8A43E359EE995073FA409AB45E93A01851 100188~|~1~|~2~|~02/CMQ~|~Construction of a 10' wide multi-use trail adjacent to SR-73 from the Butler County line to the existing GMR trailhead at Baxter Drive, north of SR-73. Split covers the work within the City of Franklin.~|~28 - Facilities for Pedestrians & Bicycles~|~D0CCB9AB835D5D721AE6BFC20D1F5F166928D848 110111~|~1~|~1~|~01/IMS~|~Rehabilitate bridge HAM-75-1642R that carries Northbound I-75 over Kemper Road by replacing the concrete overlay, Expansion joints, and correcting the approach roadway profile. Bridge: SFN 3111075~|~13 - Bridge Rehabilitation~|~9B4381EBBC67C65F7320DA3ABDDF8C82405B8759 122179~|~1~|~1~|~01/NFA~|~NEVI Round 2B I-70/77-A~|~~|~59D5B3981825035D86A96D14FD76E52475F4D111 107018~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~8027E48B930FD5FA395A60A6090A6020835C27F3 107018~|~1~|~2~|~02/NFA/HUDS~|~Drainage work leading to and away from new structure not eligible for muni bridge funds.~|~04 - Reconstruction - No Added Capacity~|~6349A61BDF6030063E9F3C0320C6BEBE8766FCC8 125727~|~1~|~1~|~01/STR~|~Resurfacing SR 164~|~05 - 4R Maintenance - Resurfacing~|~F778A4C1E4179B2D34113E85C6ED228360B7B875 101622~|~1~|~1~|~01/IMS~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~95B2BCCDB571237C4FC05E2F47BB37DF14EB3C56 96306~|~1~|~1~|~01/NFA~|~District Preservation Bridge Funding - 4PS7(100% State) - No CAP - Bridge rehabilitation on 4506219 LIC-SR 657-9.77 Intersect: Over Lake Fork Licking River; Not BR Eligible: Length=119 SD/FO(0) SR=78.5 DSR=6~|~13 - Bridge Rehabilitation~|~E1F0F072A7059AB83AAB73D51148FBE725BEF8CB 103426~|~1~|~1~|~01/NFP~|~All the work is in this split. Funding is 100% state funds from the District Maintenance Contract Program SAC 4CP7~|~99 - State Preventative Maintenance~|~EC63059A37985B3AB3D864EC217E2A1CCACFB767 109115~|~1~|~1~|~01/NHS~|~Concrete bridge deck overlay. WAS 7 9.45 L (SFN 8401470) and R (SFN 8401500), WAS 7 9.60 (SFN 8400067), WAS 7 9.78 L (SFN 8400091) and R (SFN 8400121).~|~13 - Bridge Rehabilitation~|~8803F7DD1F123524DF264117C96CBF084876AA7F 109115~|~1~|~2~|~02/BRO~|~Creating split for materials purchase~|~13 - Bridge Rehabilitation~|~D44A4A351CA8E8AFD5D0DA44D3E8468E3B560793 110220~|~1~|~1~|~01/STR~|~Landslide repair project. GAL 553 0.70. 100% State ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DBF8E693F38C1C1B6D724B9B7110076232548ABE 92839~|~1~|~1~|~01/NFP~|~Culvert replacements along various routes throughout Trumbull County, Ohio.~|~44 - Other~|~7EDDB26832C6F1DBB07CC175E1F805C8D7740626 120618~|~1~|~1~|~01/IMS~|~Work to replace guardrail and construct barrier~|~04 - Reconstruction - No Added Capacity~|~03434633016D7D0E4DF9102711D13D0D3BA7B8F7 94900~|~1~|~1~|~01/NHS~|~Culvert Replacement/Rehab~|~44 - Other~|~864F610C3229BC54E1EE0556566DFBA614251DF1 94367~|~1~|~1~|~01/IMS~|~90% fed/10% state funding split utilizing noise wall replacement program funding.~|~44 - Other~|~E8B6FEB9A3E8FFD8BAB7A85B0DCC7CAB0A4F36F2 107213~|~1~|~1~|~01/ENH~|~Install new sidewalks near Girard High School.~|~28 - Facilities for Pedestrians & Bicycles~|~35E22FDCF42814D59993979D6F25B7AACA3F061E 125039~|~1~|~1~|~01/NFP~|~Bridge replacement for municipal bridge program~|~10 - Bridge Replacement~|~E3E0285233F04D8E4FE87ADBBE586110189F70BE 99904~|~1~|~1~|~01/NFA~|~Replacement of two pedestrian bridges: (1) Glencross Avenue over Two Mile Creek and (2) one in Howard F. Wilson Park over Shaffer Creek. In addition, stabilize stream banks and replace approach sidewalk to meet ADA regulations.~|~28 - Facilities for Pedestrians & Bicycles~|~129449C9E6F4FC29B16AE55E450A92498F460990 106403~|~1~|~1~|~01/NFP~|~District Maintenance/Preservation Project - 4CP7/4PS7 (100% State) -District wide Ash Tree removal project~|~21 - Safety~|~BEF991E9B6A76BB536F6126FD33D4130FAE909C4 112848~|~1~|~1~|~01/BRF~|~Bridge replacement > 20' span.~|~10 - Bridge Replacement~|~343393CCDA45F6D132E05208E24DBE91CF61FE66 87705~|~1~|~1~|~01/S<2~|~District Allocation - 80/20~|~99 - State Preventative Maintenance~|~614975107C976B5A182BB681D573DBE05609EEEF 92080~|~1~|~1~|~01/BRO~|~6631428 PIK CR50 0.62 Intersect: Carrs Run 6630308 PIK CR50 0.51 Intersect: Carrs Run CEAO 80 Fed/20 Local match Pike County 01/BRO/BR/Pike~|~10 - Bridge Replacement~|~C67F02ACAF85AFB76567A3EF14BDC7D451AB3B48 92080~|~1~|~2~|~02/BRO~|~SFN 6630308 has to be replaced due to the federally eligible bridge being replaced, in association with the realignment. This is why credit bridge is being used on both.~|~10 - Bridge Replacement~|~28DF004EAD22BBC29C6DD98A226D979BEE2668CE 108273~|~1~|~1~|~01/S>2~|~Milling and overlaying 1,960' of asphalt roadway to achieve a proper cross slope for drainage along the roadway and new pavement markings in the City of Brookville.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0AC179F51DA375C2820B3313F75AF96663F7F56E 122232~|~1~|~1~|~01/NFA~|~NEVI Round 2B 13-A~|~~|~F1112B487A6F99A0C2D8DCA0312CE3D1BB3C5885 124891~|~1~|~1~|~01/S5K~|~All work included in this plan split.~|~28 - Facilities for Pedestrians & Bicycles~|~324532AD4DA89D7C76199244FA64710E0140E6A1 94490~|~1~|~3~|~03/BRO~|~80/20 fed/state funding split using BR funds for all work on the following structures: 1811525, 1811762~|~13 - Bridge Rehabilitation~|~3718481A48B6C29FDC0FC45C9DEC09C2E51477EE 94490~|~1~|~2~|~02/STR~|~80/20 fed/state funding split using STP funds for work on the US-322 structure: 2801477~|~13 - Bridge Rehabilitation~|~9318D81C4D0E1861ED8C923B45BF5D2DE9085205 94490~|~1~|~1~|~01/IMS~|~90/10 funding split for bridge work on the following structures: 1804502, 1805673, 1813897, 1813935, 4303938, 4303903~|~13 - Bridge Rehabilitation~|~9E10C1CBD6AC6841FF63C098AF26051B386DAE8E 108217~|~1~|~1~|~01/NFP~|~Mowing at various locations in Franklin County~|~44 - Other~|~564BEE499FE90AD240C2A09E67CA7C897D975F1E 101754~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Plan Split 1 for KNO-661-0.00 to 6.10, LIC-661-1.79 to 14.81~|~05 - 4R Maintenance - Resurfacing~|~760EB4FEE71E09B1614EAE6C39DCF5D9699F8934 101754~|~1~|~2~|~02/S5K~|~"02/S5K/PV/ " - Plan Split 2 for KNO-661-6.10 to 6.46~|~05 - 4R Maintenance - Resurfacing~|~5901271033201055CF82BBE5F01CA6CEC449D12C 101754~|~1~|~3~|~03/S5K/MTVR~|~Plan Split 03/S5K/PV/MTVR for KNO-661-6.46 to 7.41~|~~|~6C1C653F6819BB5F2850EB0EC605D75179A5088D 101754~|~1~|~4~|~04/S50~|~Plan Split 04/S50/PV/ - for LIC-661-0.00 to 1.79~|~04 - Reconstruction - No Added Capacity~|~3846EC668034605AF70874C7510CB17109B955CC 95106~|~1~|~2~|~02/MPO~|~80% federal / 20% local participation split using MPOT Enhancement funds to streetscape a portion of Cedar Road from WCL to Fairmount Blvd.~|~28 - Facilities for Pedestrians & Bicycles~|~3569803CF211FC10B8C467283BB01C8E570594B6 95106~|~1~|~1~|~01/MPO~|~80% federal / 20% local participation split using MPO STP funds to resurface Cedar Road.~|~05 - 4R Maintenance - Resurfacing~|~DBDFD3D2BB15D32953C8E20EB24FA12326FBD2B2 100214~|~1~|~1~|~01/NHS~|~Emergency Job LAW 52 11.53 Rock Remediation~|~44 - Other~|~CC1C4E3987545CB6BA782F75BAF10DD41B99C393 112697~|~1~|~1~|~01/NFP~|~Reconstruction of the POR-IR 76 Rest Area parking lots.~|~04 - Reconstruction - No Added Capacity~|~072F1DBC2B7CE5DB9127C841492A55DFFE19BD53 114290~|~1~|~1~|~01/SAF~|~Guardrail upgrade and enhancement in D8.~|~21 - Safety~|~56AE26FB45AC50CE972A8B6000CD6176BBBA4C6E 114290~|~1~|~2~|~02/SAF~|~Guardrail upgrade and enhancement in D7.~|~21 - Safety~|~C16B03967803098CAC1F768FB23200155206FA9B 24941~|~1~|~1~|~01/IMS~|~Bridge repair by cleaning and painting steel beam bridges using system OZEU and for BEL-70-2000, SFN 072722, by replacing bearings, repairing expansion joints and repairing substructure.~|~13 - Bridge Rehabilitation~|~E037380456BDC44E8B4BBDD77CF25279F2121B1B 124358~|~1~|~1~|~01/SAE~|~RCUT~|~21 - Safety~|~61BA1CCCA29DE622887C09ACE21456A2F4DE94F1 122299~|~1~|~1~|~01/NFA~|~Created for J&C Involvement. ~|~44 - Other~|~14FEC64C7027EF0415AE205026F605A7C432EE65 120401~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3D4E0A43B0BFD25A75D6DAA355C9B48888C7D6EE 82404~|~1~|~1~|~01/S>2~|~Winchester Pike & Bixby/Brice intersection improvement project. Local Sponsor - FRA County Engineer~|~03 - Reconstruction - Added Capacity~|~151E7FF4582BC320BB8927FEB7FBBC9DB33E0D1F 95311~|~1~|~1~|~01/NFA~|~Reconstructing a 4 mile stretch of City owned Northwest Industrial Lead rail track including 4 at grade crossings.~|~22 - Rail/Highway crossing~|~7C8FD0A374D093DDCC5B65163D6CA950DAE1F858 121168~|~1~|~1~|~01/S50~|~Replace culvert.~|~04 - Reconstruction - No Added Capacity~|~03458C841EC5D3B9E2C1302C47D47B69DA1C51F1 107571~|~1~|~1~|~01/SAF~|~Pavement Marking project for FY2024. 100% State funded.~|~21 - Safety~|~F9C39C34F0686AFAB86A26155C70D69A1BDE470C 99079~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 4 lanes - MIA/SHE/AUG/MER/DAR~|~44 - Other~|~ADA089EA1A8543D508AA3A8C9F05A170F4156D7F 116265~|~1~|~1~|~01/NFA~|~Funding C227 SAC~|~28 - Facilities for Pedestrians & Bicycles~|~CBABD7B96C5B74FADD802463B30C2D503266B04A 116265~|~1~|~2~|~02/MPO~|~Funding for the design consultant on-going services~|~17 - Construction Engineering~|~692ACDDCD2AD636A2462F7C3EB3600DF98EF836D 125786~|~1~|~1~|~01/NFA~|~Created for J&C Involvement.~|~44 - Other~|~59D15D4DC3984D3C6C4E6B1301A32C7F390516D9 101391~|~1~|~1~|~01/STR~|~Bridge~|~13 - Bridge Rehabilitation~|~230FF99CAF32A77FA2AE18E99D1C93D49E6845B5 107546~|~1~|~1~|~01/STR~|~Resurfacing CAR-43~|~05 - 4R Maintenance - Resurfacing~|~8308BCE4FB02D940FAAC605F90E62DFE41AEE771 102238~|~1~|~1~|~01/SAF~|~Work to reduce the congestion along IR-71~|~21 - Safety~|~0C69E461D5FA976A26BF5FFDCD642664AFC95F49 91431~|~1~|~1~|~01/STR~|~Pave culvert invert. MRG 37 4.60 (SFN 5800102). Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~65B80D3CE1069D220065A1B6CABA159E92E00870 91431~|~1~|~2~|~02/NHS~|~Pave culvert inverts. MOE 7 15.07 (SFN 5600510) and WAS 7 40.80 (SFN 8400466). Work also includes fill and plug existing 20?x16? box culvert on WAS 7 40.84 (SFN 8400458). NHS routes funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~6EB482BDF3B89E134C22878CE239888DC9D8278B 102403~|~1~|~1~|~01/STR~|~Resurfacing US 22 from GUE Co. Line to SLM 15.25 (begin 4-lane).~|~05 - 4R Maintenance - Resurfacing~|~0B68EC865BD8505D485FF68E7E6ECE7E5C2BECB4 95464~|~1~|~1~|~01/NHS~|~Major Rehabilitation - 5MT7(80% Federal) / 4MT7(20% State) and 4PF7 (80% Federal) / 4PS7 (20% State) - See CAP Comments - Resurfacing on 1) Cos-SR 16-00.82 to 8.99~|~05 - 4R Maintenance - Resurfacing~|~174DB481C97AFFAF8FA4BA880A1EB9270FA93D43 95464~|~1~|~2~|~02/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~AB8246FF04ECA2166FA5F723EB96631E71A7F5FE 97359~|~1~|~1~|~01/NFP~|~Mowing~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~544E455E0DD94EF818FE7EAD5BF6556BBCF462AF 98686~|~1~|~1~|~01/NFA~|~Libbey Rd~|~05 - 4R Maintenance - Resurfacing~|~D948B72DF5F1270A26D5FABCB73090CD3BA32F3E 96333~|~1~|~1~|~01/S<2~|~Urban Area is 0.00-1.71~|~05 - 4R Maintenance - Resurfacing~|~9F66A1EC996C6C2C2FFA4A61550BF962C683E2A2 96333~|~1~|~2~|~02/STR~|~Rural Area is 1.71-4.48~|~05 - 4R Maintenance - Resurfacing~|~C6C7F13525BB1E3DB10B6477D01FD278D1196F87 91546~|~1~|~1~|~01/NHS~|~Remove and replace existing reinforced concrete deck on bridge (BEL-7-2361, SFN 0700770) with new reinforced concrete deck. Repair substructure units as needed and provide new approach slab.~|~13 - Bridge Rehabilitation~|~74452B4FC38CE87B592A4BD05514E6CD824C7B56 111249~|~1~|~1~|~01/NFP~|~Resurfacing of Park Roads and Parking Lots~|~05 - 4R Maintenance - Resurfacing~|~D6E1BE1D0B991D6A7CDA9380B3EE6233015D2C73 99071~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on US 33 on 4 Lane and 2 Lane in Logan County.~|~44 - Other~|~606A504ACD164F15839F72583EB37AE8630E5652 102041~|~1~|~1~|~01/NFA~|~The City is constructing a full depth reclamation of Meridian Road. The project will include the reconstruction of curb and gutter that allows for the roadway to be widened from 11 to 12 feet. Reconstruct 1.2 miles of Meridian from I-680 south to Mahoning~|~01 - New Construction~|~5827B6D3A151106BF6ADBA68441B206AFC1207ED 93210~|~1~|~1~|~01/SAF~|~Improve the safety at the interection by adding a westbound left turn lane, realigning the eastbound left turn lane and changing the traffic signal timing movements and include an extension of the existing bike trail to the east within the work limits and relocation of the sidewalk in the area of the added turn lane at East Central Avenue, East Dixie Drive, Cedar Street, and Slonaker Avenue intersection.~|~21 - Safety~|~0BFF13B0D791606F66E8AA9CECF5ED5CAB869922 125897~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~4F93BC00F1E2BE5346C16B9F31C7EC06D24ED572 93527~|~1~|~1~|~01/NFA~|~4BW2 funding for metro park purchase order~|~05 - 4R Maintenance - Resurfacing~|~CE4B8CBABC709CA08AEDC20ED55C452CE6532C96 124438~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement~|~~|~0FE01ED99C88460D8701B15C7EC713054D793ACF 102522~|~1~|~2~|~02/NHS~|~Culvert LinerADA 32 10.32BRO 32 4.49~|~04 - Reconstruction - No Added Capacity~|~477CC167D9CA519CFF714138599BDA58A3876DB7 102522~|~1~|~1~|~01/STR~|~HIG 753 3.62~|~04 - Reconstruction - No Added Capacity~|~2D1FF58AF552B0F831DCCE5FA7B0B8B2175AFAE7 90574~|~1~|~1~|~01/NFP~|~This is a barrier sweeping contract using maintenance operating funds.~|~04 - Reconstruction - No Added Capacity~|~701B930994741C1F04BA2552EFF5E1221FD52BF7 116633~|~1~|~1~|~01/STR~|~Plan Split for Chip Seals~|~05 - 4R Maintenance - Resurfacing~|~34B7A2158413CB0E3955B37B6C661B9C90B1C2B6 112257~|~1~|~1~|~01/IMS~|~Plan split for Concrete Repairs on IR 670~|~05 - 4R Maintenance - Resurfacing~|~DB4205BCD6FA49A5A846E403B94F132B70F7487B 121190~|~1~|~1~|~01/STR~|~Upgrade Highway Lighting~|~21 - Safety~|~1D409A672A86972D8B354B80824D5D6804B4E08E 123823~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~4F0E08FCB8EA40C800DDE05D30641E8AE99242C4 109598~|~1~|~1~|~01/SAF~|~Plans split for Safety funded items~|~21 - Safety~|~7DE612FAEE270BBDEF3DD49B6DD251F30FF9BC79 108134~|~1~|~1~|~01/MPO~|~Resurfacing of East Waterloo Rd from Glenmount Ave to Kelly Ave in the City of Akron.~|~~|~616C33C3DF778F228062CC5BF69958F8B9C24825 91838~|~1~|~1~|~01/STR~|~General System Resurfacing on CAR-43 and CAR-183 including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~C1900BB3EBB37DB5FF377B43F82E1842375BCE8E 119160~|~1~|~1~|~01/IMS~|~All work included in this split.~|~05 - 4R Maintenance - Resurfacing~|~4DA453CF8959A0FF37D0CC2192791BF741A5F003 87277~|~1~|~1~|~01/NFA~|~general system - minor rehab. on HOL-515-0.00 to 5.51: structural overlay of 2 1/4 in. of asphalt, pavement repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~DA0A72B5418B5BE119CD67A0764C23936C2D5F87 97554~|~1~|~1~|~01/BRF~|~SFN 4735102, Ohio Bridge Partnership Program, Foley Road over Plum Creek~|~10 - Bridge Replacement~|~CA4B607A155063CF8F4ACBB37AF17DED0A6FFF21 102623~|~1~|~1~|~01/BRO~|~4800451~|~10 - Bridge Replacement~|~FB6F7B12C1213BEDF49694CDDE46E5A679F64292 103122~|~1~|~1~|~01/NFP~|~Replace School Flasher Signs, UPS Cabinet and Signal Cabinet.~|~21 - Safety~|~1067A32EB3650DD39AEFB1C4099DBBABFC7F5F2C 103122~|~1~|~2~|~02/NFP~|~Replace UPS Batteries, Relamp Signal Heads & Signal Head Replacement w/Backplates.~|~21 - Safety~|~4610FD57C025D2AE64EDA0B5050964B7AA7CD6B2 126935~|~1~|~1~|~01/SAF~|~Safety project to construct a single-lane roundabout at SR 3 (Wooster Rd) and SR 768 (Vernonview Dr) in Knox County.~|~21 - Safety~|~0EC1B4D64422002F7BDA441F189B747D7D6A9788 107570~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~77C864D54C4AEF3473F62F4C764BCF2C5DE789EB 107570~|~1~|~2~|~02/NHS~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~02152009090EA757609B351F363D03027B66AAF4 107780~|~1~|~2~|~02/STR~|~General System Split (Rural): DEL-745-4.00-7.03~|~05 - 4R Maintenance - Resurfacing~|~91BE7AF831947A83DF29EE41AF86BC634C6D157C 107780~|~1~|~1~|~01/S<2~|~General System Plan Split (Columbus Urban Area): DEL-745: 0.85-4.00. Also includes minor repair work on structure DEL 745 232 (2104156)~|~05 - 4R Maintenance - Resurfacing~|~20EFC82BDF3C050EDA0EB171802FFE31B5DFFCAF 101366~|~1~|~1~|~01/STR~|~Bridge replacement project ATH 691 5.17. Federal Aid route, 80% Federal/20% State.~|~04 - Reconstruction - No Added Capacity~|~F5C0DE2D87D09F00DB076D8DC774CF623A68ADBC 113024~|~1~|~1~|~01/STR~|~All work is in this split. Funding is 80% federal PROTECT funds with a 20% state match from district preservation funds.~|~66 - Resilience Improvement - Highway Project ~|~63626A0A110CAA1AE6C34BA8B8975464CE28AE77 104774~|~1~|~1~|~01/NFP~|~District wide Barrier Reflector replacement.~|~~|~B06048BCD8DDF6DB375FBB990404467413884AB6 118592~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~7C42F60CF0005729E6A749B9AE73A7EEC9D2C8C4 91552~|~1~|~1~|~01/STR~|~Deck replacement. Located 0.26 miles South of Pike County Line on SR 1047303211 SCI SR104 17.37 Intersect: Camp Creek80 Fed/20 State. 01/STR/BR/State~|~10 - Bridge Replacement~|~D01E5B79F1F61E9CEE80BCE5D7B83BB9BC9D314C 100993~|~1~|~2~|~02/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment with repair. MRG 376 10.00-19.45. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~BBBF0DA8BCBC92A0E1E7D0722183A3719D9C598A 100993~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment on MRG 376 0.00-9.73. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~5B60D5CC14E4EEAB6B6718A6A739906AEDB869CD 114154~|~1~|~1~|~01/NFA~|~Minor repairs and resurfacing 1/2 of parking lot~|~05 - 4R Maintenance - Resurfacing~|~6C9B54C61FC5B2F01F1190D1BB04C19FA9D52146 126417~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with RepairsHUR-547-7.465 to 8.165Asphalt Concrete Overlay without RepairsHUR-547-7.124 to 7.465~|~05 - 4R Maintenance - Resurfacing~|~1EBE0737FAC6FB1943155EA2438570C82F111312 126417~|~1~|~1~|~01/NHS~|~Asphalt Concrete Overlay with RepairsERI-250-9.214 to 12.467Asphalt Concrete Overlay without RepairsHUR-20-6.822 to 7.462~|~05 - 4R Maintenance - Resurfacing~|~BC618984E9B026975329DEFCD0718C58215F6755 126417~|~1~|~3~|~03/NHS~|~Pavement Repairs within village of Milan ERI-250-11.754 to 12.468~|~~|~0044F8A2D5D9D5F155F6E0362903CDF5B5978F06 126417~|~1~|~4~|~04/NHS~|~Pavement Repairs within village of Monroeville HUR-20-6.822 to 7.462~|~~|~8E3155D51DA7CA3BE42E9E5DD9BE79FE0D7CF9B0 126417~|~1~|~5~|~05/S5K~|~Pavement Repairs withing village of Monroeville HUR-547-7.124 to 8.165~|~~|~1B275747D97EEEB238E612FE5CA3FC620B67F882 97598~|~1~|~1~|~01/S<2~|~Herbicidal spraying along various roadsides in D07~|~44 - Other~|~5F3FCC33A687622D22D90307F0064150726B58B6 115819~|~1~|~1~|~01/SAF~|~Safety project on CR49.~|~21 - Safety~|~C1BDC640B6B3E926C81FF89FA2CF44430A77DA19 111020~|~1~|~1~|~01/SAF~|~Safety funded plan split~|~04 - Reconstruction - No Added Capacity~|~1712DBB4FEB87711D69B0712B3D4246A1901E81A 111020~|~2~|~2~|~02/S<2~|~West State St resurfacing from SR 53 to Christy Rd~|~05 - 4R Maintenance - Resurfacing~|~383BA4B78B70B779B3C98E3E622FE2C4ED8EE016 111020~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~063BA5A69A6D041AF89483239331C898BE851538 107262~|~1~|~1~|~01/IMS~|~CO Noise Wall Program - 5BV7 (90% Federal) / 4BV7 (10% State) - No CAP - Construct Type II Noise wall: Lic-IR 70-01.90 to 02.14;~|~20 - Environmental Only~|~BC7BA6C434889A6E3EE6EF02EF5F10DF3B897CCB 122858~|~1~|~1~|~01/NFA~|~Pavement repairs and resurfacing around Cooper Arena/Voinovich Building/O'Neil Building/Viaduct, Crack seal and pavement markings on Black and Gold Blvd.~|~05 - 4R Maintenance - Resurfacing~|~3AF8AC7CFEB2C67635992F1F5E7B2743B9EE8A30 122858~|~1~|~2~|~02/NFA~|~Pavement repair and resurfacing of the main entrance parking lot at the History Connection.~|~05 - 4R Maintenance - Resurfacing~|~290F02E2A5EE3B5A3CBEA328F8C572E021217CB1 119918~|~1~|~1~|~01/BRO~|~Increase resiliency of bridges carrying US 22 over Cross Creek and TR 166 by protecting pier w/use of rock channel protection. Work along TR 166 will be completed as being incidental to the construction of the rock channel protection.~|~47 - Bridge Preventive Maintenance~|~A6E7CB621E97887BC272F29692144FEA0332032E 102802~|~1~|~4~|~04/STR~|~STP rural bridges~|~13 - Bridge Rehabilitation~|~4DBAD38F1D17D33C8D7F7C33E083BC9351C4D53D 102802~|~1~|~1~|~01/NHS~|~SR-108 from SLM 8.01 to 13.39 NHS Pavements~|~05 - 4R Maintenance - Resurfacing~|~9DA5C27CF498B4B0506B9BBF260D8E297E9D042C 102802~|~1~|~3~|~03/S<2~|~SR108 from 6.77 to 7.05 Pavement in the Wauseon urbanized area~|~05 - 4R Maintenance - Resurfacing~|~F0235617B2DF1B76348315671319979B8ABDB153 102802~|~1~|~2~|~02/STR~|~SR108 from 7.05 to 8.01 and SR-109 from 14.90 to 18.00 STP rural pavements~|~05 - 4R Maintenance - Resurfacing~|~EDE226FACE5C03D1F5CEA408594EBD9B7E342817 106766~|~1~|~1~|~01/ENH~|~TLCI Work~|~28 - Facilities for Pedestrians & Bicycles~|~A981F6CB998FDDDE74881EFF9D8C0BEDA10A057B 106766~|~1~|~2~|~02/ENH~|~100% LPA~|~~|~7C9395DC75D469868BFEE049172098FEB2B2470C 93521~|~1~|~2~|~02/STR~|~02/STR/BR/ ; ALL-75/103-16.32/0.30, SFN 203572; 80% Fed (4PF7) - 20% State (4PS7)~|~13 - Bridge Rehabilitation~|~7D38563CA8F5E4E27EEAF1E968DD22D461250319 93521~|~1~|~1~|~01/IMS~|~01/IMS/BR/ ; ALL-75/103-16.32/0.30; SFN 204447 and SFN 0203548; 90% Fed SAC 4PF7 - 10% State SAC 4PS7~|~13 - Bridge Rehabilitation~|~A877653812DACB0AD8B39FD746F1E1C325DA8D6A 101406~|~1~|~1~|~01/STR~|~CO CO Contr 01 plan split 1 for the following STP Rural routes: DEL-4-0.00-1.98 DEL-47-0.00-1.07 MAR-4-13.00-20.49 MAR-37-3.31-8.45 MAR-95-0.00-0.45/4.48-13.10 MAR-203-.043-1.19/3.24-7.74 MAR-231-0.00-4.32 MAR-739-0.00-8.14 UNI-4-14.07-26.25 UNI-37-0.00-2.20/5.49-9.14 UNI-739-22.93-25.81~|~05 - 4R Maintenance - Resurfacing~|~26EE5567E8B3CF9468714F49B5FACC3B5699124F 101406~|~2~|~2~|~02/NHS~|~CO CO Contr 02 plan split 2 created for the following NHS Routes: MAR-309-0.00-15.35~|~05 - 4R Maintenance - Resurfacing~|~BAAE77F46FFF1115FA7D9DFEDE446DF9A2E01A0B 101406~|~1~|~3~|~03/STR~|~CO CO Engr 01 plan split 1 created for the following STP Rural routes: DEL-0.00-1.98 DEL-47-0.00-1.07 MAR-4-0.00-1.69/13.00-20.49 MAR-37-3.31-8.45 MAR-95-0.00-0.45/4.48-13.10 MAR-203-0.43-1.19/3.24-7.74 MAR-231-0.00-4.32 MAR-309-0.00-15.35 MAR-739-0.00-8.14 UNI-4-14.07-26.25 UNI-37-0.00-2.20/5.49-9.14 UNI-739-22.93-25.81~|~17 - Construction Engineering~|~1E70FE4146277A087D2F76BAE5237FF21A1D03C3 101406~|~2~|~4~|~04/NHS~|~CO CO Engr 02 plan split 2 created for the following NHS routes: MAR-309-0.00-15.35~|~17 - Construction Engineering~|~828E1D90A30AF8013BCB2DCA9FDC2B683AD1F811 106829~|~1~|~1~|~01/SAF~|~100% Local~|~21 - Safety~|~501F38F59C618F8C0A2F1A123A30E8D46E82EEF3 116728~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D2A6869D4A8869A5AB63A5517F276A7A1072C44A 116728~|~1~|~2~|~02/S>2~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~7FC12F2ABE48B54E9C0ADA623C813CB8947E208E 98991~|~1~|~1~|~01/S>2~|~Wheeling St~|~05 - 4R Maintenance - Resurfacing~|~1B4CDDA80C96ACA34E9F93595394647EBE869A60 94517~|~1~|~1~|~01/STR~|~It is proposed to replace SFN 7306172 on SR728, 1.53 and add guardrail.80 Fed/20 State01/STR/BR/State~|~10 - Bridge Replacement~|~C4BE4CA119959DD9C32A09E82FF5237FA1967BB4 93067~|~1~|~1~|~01/IMS~|~90/10 funding split for all work on this project.~|~44 - Other~|~D3522F20E29EA0C88FB7595257615C092DF5E26E 112255~|~1~|~1~|~01/IMS~|~Spot paving on FRA-270 from 0.60 to 9.65 and FRA-71 at SR 665 interchange ramps~|~05 - 4R Maintenance - Resurfacing~|~2768AC28539D99509B83BC3A8E38B0373F6E2982 112712~|~1~|~1~|~01/IMS~|~Epoxy overlays of FRA-670-1.08 (mainline and 2 ramps) & FRA-270-24.86~|~13 - Bridge Rehabilitation~|~F9DC1C0BFE8E4418F34FE8DDB2531D8DB9BBE19D 112371~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Replacement of SFN 4505700 structure.~|~10 - Bridge Replacement~|~338BAB5144B1573FFDFD7216B6EC76953465FF6D 109495~|~1~|~1~|~01/STR~|~Bridge replacement project. NOB 145 0.38 (SFN 6101747) and NOB 147 18.42 (SFN 6103219). Rural other federal aid.~|~04 - Reconstruction - No Added Capacity~|~204CA3140CEA6F241DCC41447A6EE535C7A027F6 94664~|~1~|~1~|~01/SAE~|~Project involves upgrading the existing pavement markings on various county routes in Butler County~|~21 - Safety~|~1E9CDA0C360DF18C53BCC5063E01CACCFAA53CBA 93428~|~1~|~1~|~01/NHS~|~Priority System preventive maintenance on JEF-7-10.83 to 14.78; includes asphalt mill and fill; minimal repairs and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~5C36E36575BFDA25D1ED7DFD488671D3E3D0E4D9 91721~|~1~|~1~|~01/NFA~|~Two-lane resurfacing project using an asphalt overlay treatment. GAL 218 0.00-3.84. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~96E8CA9AEC93FD0C89275AFFF4FAB8F53ED981C5 117700~|~1~|~1~|~01/S>2~|~Installation of electric vehicle chargers~|~64 - Other Alternative Fuel Vehicles & Infrastructure~|~D9197821EF809D5AE9F25A8DA3B763018CD15042 115991~|~1~|~1~|~01/NFA~|~Stabilization and repair of failed embankment.~|~~|~4284111181B423EF45C967451964E95F18CF3EC0 101055~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay to TRU SR 46 from 18.45 to 23.64.~|~~|~ABDBD7FE10F3F326F690B03C2DBA9477E9EF6E5E 80492~|~1~|~1~|~01/S<2~|~Plan split for the portion of SR81 within the Urban Area boundary of Lima. This is from 19.16 to 20.21 on SR 81.~|~05 - 4R Maintenance - Resurfacing~|~19B0D3ECF46D7F4FD31F882C05C2DFE7912AEF0E 80492~|~1~|~2~|~02/STR~|~Plan split for the rural portion outside of the urban area of Lima. This is for SR 81 from 20.21 to 29.42 and on SR 65 from the South Corporation Limits of the Village of Cario at 13.75 to the north Corparation Limits of the Village of Cario at 13.90.~|~05 - 4R Maintenance - Resurfacing~|~2C7F297C559490F3AD225E37E4BCA90F104015FB 122155~|~1~|~1~|~01/CMQ~|~Citywide traffic signal replacement work at 35 locations using CMAQ funding.~|~21 - Safety~|~6884C7A00D91280982A88FCAECE876D65B86F177 123848~|~1~|~1~|~01/S5K~|~slide repair~|~04 - Reconstruction - No Added Capacity~|~26F9513DE2D99A8CCFAB01E7A9FC8950E6AF2670 111028~|~1~|~1~|~01/SAF~|~Repair landslide on Columbia Parkway.~|~21 - Safety~|~FC49B006D7952CBA563577AC7EF890C43DBA8BCE 108977~|~1~|~1~|~01/SAE~|~100% Safety Plan Split~|~21 - Safety~|~2652F8C74D114B635525729A7564A15C9832766D 9299~|~1~|~1~|~01/S>2~|~Unfunded plan split. This will be modified in the future when funding becomes available.~|~17 - Construction Engineering~|~92BF656CA6838BEB1B682BBD6E6AACC7DD27D5B4 112493~|~1~|~1~|~01/STR~|~AC Overlay without repair~|~17 - Construction Engineering~|~1B6C7DB4DC5DDA698CA77432EACA206C2246203A 106959~|~1~|~1~|~01/NHS~|~Pavement work to include a SB entrance ramp and a NB exit ramp and a CD road from Sunbury Parkway to US36/SR37 exit. Also, Sunbury Parkway to Wilson Rd. and the extension of Wilson Rd to Sunbury Parkway.~|~01 - New Construction~|~4A7025FCE967B4E7B8F2FB234C01D58566B4F9EF 106959~|~1~|~2~|~02/NHS~|~Structure over IR 71 as part of the interchange construction~|~08 - Bridge - New Construction~|~E1E7E92A3D1748A27BED22061447F2AFA28DD154 97642~|~2~|~1~|~01/BRO~|~SFN 8758395~|~10 - Bridge Replacement~|~CEC5F7977703358280C5E836B8034418432E80AC 97642~|~3~|~2~|~02/BRO~|~SFN 8748985~|~10 - Bridge Replacement~|~F1BF0E48CBF9C58FA848F326F653909284966ED6 87346~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - Geological Site Management 4SF7(80% Federal) / 4SS7(20% State) - CAP = $421,000.00 - Slope stabilization at 1) MUS SR146 30.95-30.98; 2) MUS SR146 31.51-31.54; 3) MUS SR146 31.58-31.61~|~~|~27D682D13B1A8585627BB8210302823731A04D7B 102748~|~1~|~1~|~01/STR~|~This plan split is for bridge repair on rural bridges.~|~13 - Bridge Rehabilitation~|~142D9EF94A36D97D434DB333718C2FAFF8B0ED3F 98903~|~3~|~5~|~05/S<2~|~Minor bridge work 10' to 20' structure.~|~13 - Bridge Rehabilitation~|~B1FFE8B66AF1C2ED3BA81D935564BC7A53383B4B 98903~|~1~|~1~|~01/NHS/CONN~|~Total pavement replacement of ATB US 20 from 23.02 to 23.75, in the City of Conneaut, Ashtabula County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~A6460BDF6539563BFBFE416F92F4E183AE33A1C7 98903~|~2~|~2~|~02/BRF~|~Miscellaneous bridge work to Center Street structure.~|~13 - Bridge Rehabilitation~|~1442DB2C9B9739AF8CDAF7B23EE1AB996CBBAF65 98903~|~3~|~4~|~04/NHS/CONN~|~100% City of Conneaut Items including full and partial depth repairs, manholes and catch basins reconstructed to grade and ADA curb ramps.~|~05 - 4R Maintenance - Resurfacing~|~754D1B9918259B795EBBD7A3D0A55BAF4009018F 98903~|~3~|~3~|~03/NHS/CONN~|~Resurfacing of ATB US 20 from 21.86 to 23.02 and 23.75 to 25.93, urban paving in the City of Conneaut.~|~05 - 4R Maintenance - Resurfacing~|~A81ABA29428DD6B541046F1D553CBCBDA8963B6D 98903~|~1~|~6~|~06/NHS/CONN~|~100% Conneaut Items for manhole frames and covers.~|~04 - Reconstruction - No Added Capacity~|~02A7A8E6CE9D1B58B08E757CB2B28510DE74DFC0 98903~|~1~|~7~|~07/NFA~|~Retroactive fuel price adjustment~|~44 - Other~|~FD2EFE88ADE0DD270B86BD28B15C6673BBF1CB7F 98527~|~1~|~2~|~02/BRF~|~The bridge on SR 195 is on a Minor Collector. District Preservation Progam funds.~|~13 - Bridge Rehabilitation~|~56DE4857E26E0F7DD1F64D487D8923F3361E6F04 98527~|~1~|~1~|~01/BRO~|~The two bridges on SR 31 are on a Minor Arterial. District Preservation Program funds.~|~13 - Bridge Rehabilitation~|~6E88A238381CF79E114BADAEECEBE04C1E0449A0 121497~|~1~|~1~|~01/S5K/ZANE~|~Mill and fill resurfacing of MR 350/903 within the City of Zanesville using Large City STP funds.~|~05 - 4R Maintenance - Resurfacing~|~7281BDE978FC4029DDF834994C4C50612A6FCE1D 121497~|~1~|~2~|~02/S5K/ZANE~|~Enhancements including sidewalks, curbs and curb ramps along MR 350/903 within the City of Zanesville.~|~28 - Facilities for Pedestrians & Bicycles~|~3EC8C212CE592507984E1881585FFE57DFC2FE37 103933~|~1~|~1~|~01/ENH~|~Construct sidewalks along Garfield Street in the City of Struthers.~|~28 - Facilities for Pedestrians & Bicycles~|~BD622840180C13B9D8EE018D0F79048DCD40BF4D 110693~|~1~|~1~|~01/IMS~|~Spot concrete slab repair on I-270 in Franklin County at various locations~|~05 - 4R Maintenance - Resurfacing~|~8256C0618D07098CCB5BFAAF966AE084B06BA197 124543~|~1~|~1~|~01/STR~|~Reconstruction~|~04 - Reconstruction - No Added Capacity~|~A4F734A2BE18D841C2AFBDAAFC2BCDED36FF109F 108881~|~1~|~1~|~01/NFP~|~The TOWNSHIP will reconstruct within the existing roadway and approximately 5,500 feet Lynn Road from west of State Route 44 to County Road 31~|~44 - Other~|~CBCDC0A9D63E19AFC42FDFC99CD94B966B8AD04E 105082~|~1~|~1~|~01/NFP~|~Maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~69FE3A4BC7D0A402ED64823E1C8FB0215AFE247E 122978~|~1~|~1~|~01/BRF~|~Plan Split for Municipal Bridge funded scope.~|~13 - Bridge Rehabilitation~|~CDAEAD8317425CEB27A34AD50E785D0C17812846 118582~|~1~|~1~|~01/NHS~|~Rehabilitation of culverts on NHS routes.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~5C3ADF85892517C98C0FF0009C13F107EA3E6CEA 117791~|~1~|~1~|~01/BRO~|~Split for bridge repair work~|~13 - Bridge Rehabilitation~|~94042DF8350409D26DA9F365C1B77B0F3FAAA01B 110861~|~1~|~1~|~01/SAF~|~Safety Program Funding - 4HJ7 (90% Federal) / 4BC7 (10% State) - No CAP - Upgrade of US 62 by widening for two way left turn lane and signal upgrade at US 62/Village Square Shopping Center.~|~21 - Safety~|~6A8504D75AB857A514DB5C3023B880F7072EBED1 13182~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for all work using federal BR funds: 1801740, 1801775~|~10 - Bridge Replacement~|~D514140A9F8266A79E4D8C542DD6E9A8B8F20518 103197~|~1~|~1~|~01/NFP~|~Split for guardrail work~|~21 - Safety~|~CE4C41A1E917B7C5660FFFE423952BAFCA5B215A 89022~|~1~|~3~|~03/CMQ/STA~|~Signal upgrades, Jackson Township, Stark County, Ohio.~|~21 - Safety~|~A61663211BD562194A630460DED741FCBFDBCF1E 89022~|~1~|~1~|~01/MPO~|~Addition of Center Turn Lane from RR tracks on Whipple Avenue to the intersection, and RR tracks on Everhard Road to the intersection. Includes new storm sewer, curb and gutter, culvert replacement, signing, and striping. Elimination of left turn movements, and access management. In Jackson Township, Stark County, Ohio.~|~03 - Reconstruction - Added Capacity~|~5057CE2E17B8FE8420943E4A72C2F41839CEFD1C 89022~|~1~|~2~|~02/SAF~|~Safety funded items on Everhard Rd. and Whipple Ave.~|~21 - Safety~|~6A6E9856B36AFA125CAF1FEDC95A595991AD3AF5 109737~|~1~|~1~|~01/SAF~|~Construct a full-length (~800 ft) eastbound deceleration lane at the ramp to Interstate 71 northbound. Safety Application: 201810D03-04~|~21 - Safety~|~AF4C7BE88B00FC63A0550847D5A30EAB2BF7EC89 90588~|~1~|~1~|~01/SAF~|~Pavement marking upgrade project funded with CEAO funds. 100% Federal.~|~21 - Safety~|~5EF684A9CD533DE4352D993DEAAC214C973116A8 105574~|~1~|~1~|~01/STR~|~RIC-SR-39 22.810 SFN 7002521 Over ROCKY FORK CREEKNew Construction Full Structure Replacement~|~13 - Bridge Rehabilitation~|~E745CEE05826EFC3E6C39B9FDAE1C0CC84C863CB 98904~|~1~|~1~|~01/BRO~|~Replacement of Bridge No. WAR-CR 7-0846 (SFN: 8330441) which carries Wilmington Road over Gum Run.~|~10 - Bridge Replacement~|~44DE84FDEDA94D226D5FDE5DB4E617D85EEDDB54 116874~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~7D5E5013A521A28915EBFFA15ACDA11CDA6EAB74 106473~|~1~|~1~|~01/NFP~|~District wide construction inspection task order.~|~17 - Construction Engineering~|~18E0EBC6C785998C914B2CA895141EBBFBBC2137 111625~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4.~|~~|~891140B4EF8130F49C9C77E8C7B1562081DB15EC 103008~|~1~|~1~|~01/NFP~|~Install RPM's on various routes in District Six~|~21 - Safety~|~B841E3BC2C92AF87C4984F30567DDFA84170335D 119448~|~1~|~1~|~01/S50~|~Intersection project.~|~21 - Safety~|~71E211903285B2205B18CAAA598612210223701F 124684~|~1~|~1~|~01/BRF~|~CEAO LBR Federal State Exchange~|~10 - Bridge Replacement~|~2963B15D4524CFCB1CD477036BDF943A47CBDC9F 116287~|~1~|~1~|~01/NFP~|~Fence repair and maintenance on various routes throughout district 4.~|~21 - Safety~|~83F38C26C0748B91EB373053ED3E453A9D609AE4 93281~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) 3001539 GUE IR70 12.75 Intersect: I-70 Over Leatherwood Crk; Not BR Eligible for Rehabilitation: Length=172 SD/FO(0) SR=90.6 DSR=6; 2) 3001563 GUE IR70 12.75 Intersect: I-70 Over Leatherwood Crk; Not BR Eligible for Rehabilitation: Length=172 SD/FO(0) SR=90.6 DSR=6;~|~13 - Bridge Rehabilitation~|~54E70A4141FC043813D48AD90F25674215CE3ADD 110894~|~1~|~1~|~01/S>2~|~1 3/4" mill and fill using superpave mix on: MIA-41 SLM 11.70 to 12.90~|~05 - 4R Maintenance - Resurfacing~|~E87893FE735A78FB4AEAD8C1B670DFD95FA1C315 99496~|~1~|~1~|~01/S<2~|~Slide Repair~|~21 - Safety~|~AFE2C997A6FD7B98739DD9B7D8E17F6F44CE7479 98005~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~6BB1C36411ED24B2317031B75DB65DFC45F59788 91128~|~1~|~2~|~02/STR~|~80/20 fund split for bridge replacement in the rural area using federal STP funds: 2801906; GEA-528-0749 & 2801957; GEA-528-0857~|~10 - Bridge Replacement~|~29F58464C71A6EA91D6A37929B7830EE3D7BD621 91128~|~1~|~3~|~03/S>2~|~80/20 fund split for bridge rehabilitation using federal urban STP funds. 4306279; LAK-608-03.03~|~10 - Bridge Replacement~|~564C9FA23F0AB2A843969748956DE9614F15735A 91128~|~1~|~1~|~01/NHS~|~80/20 fund split for culvert replacement using NHS funds: GEA-306-13.45: CFN 283061345~|~10 - Bridge Replacement~|~7BD4CBFF42CB1D4449102B980AC27FFD91B8F0C0 93246~|~1~|~1~|~01/MPO~|~Repairs to existing bikeway and asphalt overlay on Wolf Creek Bikeway from the Montgomery/Preble County line to Albert Street in Brookville.~|~28 - Facilities for Pedestrians & Bicycles~|~92DE56D2BD1EAB336DD424902423C82CC8B9BEF6 88646~|~1~|~2~|~02/IMS~|~SFNs: 8706573, 8706603, 8706638, 8706662~|~13 - Bridge Rehabilitation~|~31F240F903F0F8CCA1F90D63F38F84D857089430 88646~|~1~|~1~|~01/IMS~|~WOO IR475 0.00-4.01~|~05 - 4R Maintenance - Resurfacing~|~DC7D8AE12D657DCF0BE08CEBFAFD7CBD0E56BF35 88857~|~1~|~1~|~01/STR~|~Bridge Replacement~|~10 - Bridge Replacement~|~64C4FABDE7126BE35356048C2F83FDCEFD258F2B 88857~|~1~|~2~|~02/STR~|~HUR-601-01.85 sfn:3904474 / HUR-061-21.08 Culvert Replacements~|~~|~DFF126B1A1DA287EF9EF9A9E8D7E2DE316618F8D 92731~|~1~|~2~|~02/NHS/Perr~|~100% Local Funding for pavement repairs, curbs and curb ramps on SR 25.~|~05 - 4R Maintenance - Resurfacing~|~15BF1DBEA6F8A8252F2A374C72D4A87C9C5AC908 92731~|~1~|~3~|~03/SAF~|~US-20 from SLM 0.26 to SLM 0.50~|~05 - 4R Maintenance - Resurfacing~|~628A2643D9B2BE8CCB6056A56642B68C3E74BA32 92731~|~1~|~1~|~01/NHS/Prbg~|~resurface WOO SR 25 21.81-22.57; resurface SR-25 from Perrysburg south corp line to US-20~|~05 - 4R Maintenance - Resurfacing~|~6FAEFF31DC061FBA7A95B2E99817FC864ADE6CE0 119779~|~1~|~1~|~01/S5K~|~added plan split.~|~13 - Bridge Rehabilitation~|~A5C0FB75CD83CFD47FBEF67B13F9D5D7731B5A0F 90775~|~1~|~1~|~01/SAE~|~01/SAE/OT/ This split is for traffic signals on the NHS system. All three signals in the project are in this split. The traffic signal at US 23 and CR 330 in Wyandot County is in this Plan Split because US 23 is on the NHS. The traffic signal at SR 65 and Bluelick Road in Allen County, and the traffic signal at US 224 and CR 140 in Hancock County, are in the split because MAP-21 added all Principal Arterials to the NHS. Funding is 100% federal funds as the work eligible for 100% safety funds.~|~21 - Safety~|~1DFFC1AD6EFDD9184E0A14E02548D42E0F1357BB 102195~|~1~|~1~|~01/STR~|~ADA CR 10 1.42 ER Slide Repair.~|~44 - Other~|~604D8890F510077901D7A8E9B9BFCA485381CD59 92650~|~1~|~1~|~01/STR~|~Overlay SR 49 & SR 707 in Mercer County with fine graded aggregate:MER SR 49 SLM 9.36 to 13.91MER SR 49 SLM 21.45 to 26.59MER SR 707 SLM 0.00 to 11.29~|~05 - 4R Maintenance - Resurfacing~|~307C52A63DA50B8F3D97797D915F627EDA920DAB 88672~|~1~|~1~|~01/NHS~|~Resurfacing on a portion of HAM-27 including bridges over Great Miami River~|~05 - 4R Maintenance - Resurfacing~|~027E9C7E2DF85DC2249198559819642BD6CF0CB5 79846~|~1~|~1~|~01/CMQ~|~Plan Split for Traffic Signals on TRU Warren Sharon/Howland Wilson~|~21 - Safety~|~2C39B9F4DC5B9E3612AAB2AE1423665A308537A2 101312~|~1~|~1~|~01/STR~|~Resurfacing of PIC-56-22.02 to 33.93 and PIC-180-0.00 to 0.48~|~05 - 4R Maintenance - Resurfacing~|~511C164AB1F15E178F936E5612C5765C174AB266 101312~|~1~|~2~|~02/S<2~|~Resurfacing PIC-56-20.66 to 22.02~|~05 - 4R Maintenance - Resurfacing~|~EB01498397C2CFDA7EBCADF743665386CA14078D 101312~|~1~|~3~|~03/S<2~|~Resurfacing PIC-316-9.48 to 11.27 and 11.55 to 14.05~|~05 - 4R Maintenance - Resurfacing~|~BEB2860FAD663C228950379F3175EC877B932646 101312~|~1~|~4~|~04/S>2~|~Resurfacing FRA-674-0.00 to 1.99~|~05 - 4R Maintenance - Resurfacing~|~E15B731C2F1F903D308D4A4B35BEEEBAD251B797 101408~|~1~|~1~|~01/NHS~|~Plan split for the 80/20 split items on SR 4 (NHS).~|~05 - 4R Maintenance - Resurfacing~|~5936A7657C32CF04E793354D6BABA41A6CD540B1 101408~|~1~|~2~|~02/NHS~|~Plan Split for all 100% City items on SR 4 (NHS).~|~05 - 4R Maintenance - Resurfacing~|~3017FC919FAD6D56A8E89B62957D20FB0FB0D3CF 101408~|~1~|~3~|~03/NHS~|~Split for 100% ODOT work on SR 4 (NHS), outside City corp limits.~|~05 - 4R Maintenance - Resurfacing~|~8A1DD77B31A80FD0D97FCE9AC9A0C979C3F8684C 101408~|~1~|~4~|~04/S>2~|~Split for Urban Paving eligible work on non-NHS routes.~|~05 - 4R Maintenance - Resurfacing~|~E03B3EFCACB8ADADD9C7E304FB518DA5601F5A84 101408~|~1~|~5~|~05/S>2~|~Split for 100% City cost on non-NHS routes.~|~05 - 4R Maintenance - Resurfacing~|~D09951257C7905AD18D193945132D6E7B4351128 90201~|~1~|~2~|~02/IMS~|~90/10 fed/state split for all work using federal IM funds for the following structure: 1808516 (Wooster)~|~13 - Bridge Rehabilitation~|~6D9B7A9C023BFBF2CFD0F48D1D976D891B4A1614 90201~|~1~|~1~|~01/BRO~|~80/20 fed/state funding split for work on the following structures using federal BR funds: 1808591 (Hilliard), 1808656 (Woodward), 1808575 (SR-237), 1808621 (McKinley), and 1808540 (Valley View).~|~13 - Bridge Rehabilitation~|~F8DE5AF2E522400A0CDF52E60D3AE266641B7103 93204~|~1~|~1~|~01/NHS~|~Crack sealing with minor pavement repairs on SR 49 from Third Street SLM 0.00 to SLM 1.08 within the City of Trotwood.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C434A9BBF67E7043BED727A57C8EC0F6694687D7 93204~|~1~|~2~|~02/NHS~|~Crack sealing with minor pavement repairs as needed on SR 49 from SLM 1.08 to SLM 2.77 (CSX Railroad Bridge) within the City of Dayon.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~DCCFE93AC31F8549B69FDE2D9E293E267DE1130C 93204~|~1~|~3~|~03/NHS~|~Remove rubber joints and crack seal bridge.~|~13 - Bridge Rehabilitation~|~964C342467CC839E9DB511C9D411F8800B309533 102985~|~1~|~1~|~01/BRF~|~01/BRF/BR/JEF - Bridge replacement on County Road 53 1.46; 80% 4C87/20% LNTP.~|~10 - Bridge Replacement~|~687E5A12C29544E0491E890274B35BF70BC0DE5C 108680~|~1~|~1~|~01/NFA~|~Bridge replacement project over Monday Creek. Woodlane Drive Bridge, SFN 0560000. Funded through the Municipal Bridge Program. Funded 95% Federal (80%/15% TRC) and 5% local.~|~10 - Bridge Replacement~|~D4D6DB9182EEE7E896CCC21D8C444D1F641BFAC4 115371~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~CA871732A2EDA578B12814565519744031FFFCF1 104741~|~1~|~1~|~01/NFA~|~The County will improve 800 feet of N. Blanchard Street starting at CR99 and heading in a southerly direction.~|~01 - New Construction~|~44E3B103B7891F634A9B3047CA30115B76FEEDD7 113269~|~1~|~1~|~01/SAE~|~Safety funded plans split~|~21 - Safety~|~D57433728046C83387A059A2D0C5850702DAB667 105707~|~1~|~1~|~01/SAF~|~plan split~|~21 - Safety~|~FF4469E35F930B3FC060A632C44A53D281645D40 116762~|~1~|~1~|~01/STR~|~Rural~|~~|~8A62956D060238F4390A41A68C2CDE1E935EECFF 125006~|~1~|~1~|~01/NFA~|~Pavement Marking. Hocking County. Funded 100% Federal.~|~21 - Safety~|~467BA57595DB98D0BE77F3B0C035D5DADE392E82 116034~|~1~|~1~|~01/NHS~|~Install Vandal Protection Fencing on bridge carrying MR 197 (Jackson Street) over US 30 and remove the structure mounted signs to be reinstalled along the shoulder.~|~13 - Bridge Rehabilitation~|~A4D6AF1429400F749883ABA43616DE9660122D73 105252~|~1~|~1~|~01/NHS~|~Resurfacing on SR 7 from SLM 2.24 to 5.87~|~05 - 4R Maintenance - Resurfacing~|~BFC544E8FC7C12336948F5F4899F42FA5BD81CD0 114282~|~1~|~1~|~01/IMS~|~Mowing contract - D8.~|~99 - State Preventative Maintenance~|~C5CDA4EC0598140EF536752797E904259BF9A597 114282~|~1~|~2~|~02/IMS~|~Mowing contract - D7. Routes in Montgomery County~|~99 - State Preventative Maintenance~|~019952702880EE095A0B05FAC356CFC1DAFFC883 98018~|~1~|~1~|~01/NFA~|~J&C Funds for reimbursement to City of Marysville~|~44 - Other~|~810D94EC7C4C3FCB5617AC6AB3E184B7E406CB34 105345~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~3BD52E379D9C0FCA4621816698C7459E8BCD1813 127105~|~1~|~1~|~01/NFA~|~Local-let NEVI funded project to install EV charging stations.~|~63 - Electric Vehicles & Charging Infrastructure~|~5F0CFA3F30D776928DDD0ACFE8FE6CD40EF319D5 100626~|~1~|~1~|~01/S<2~|~Resurfacing of BEL-7A with new sidewalks and curb~|~05 - 4R Maintenance - Resurfacing~|~297D46FB75D963000F296952B058402E8DBA76F7 93897~|~1~|~1~|~01/SAF~|~Installation of RPM's at various locations within the district.100% state~|~21 - Safety~|~C49FBF6B6D008D2B831CC72B6E38B9280B7DA9B2 107641~|~1~|~1~|~01/STR~|~Replace bridge ROS 180 4.54 (7104685)~|~04 - Reconstruction - No Added Capacity~|~AB6CEDF46A9C93D310C0BDA1D66780034E88A601 86756~|~1~|~1~|~01/SAF~|~New Signal MED-003-09.53~|~21 - Safety~|~CD9D582881FADC874170FEA1A4BDD693730929CE 107600~|~1~|~1~|~01/IMS~|~Rehab storm pipes~|~44 - Other~|~F644D169E909F8C81E8C23E0E497960C82BE89F9 107600~|~1~|~2~|~02/NFA~|~Repair storm pipe~|~44 - Other~|~087C7BC6EDB3F8C340CAB0E214348CD26E21AEAE 92362~|~1~|~1~|~01/STR~|~Resurfacing HEN SR18 17.43-20.62; Resurfacing Woo-582-0.00-5.34~|~05 - 4R Maintenance - Resurfacing~|~44F1538A40CBEC9455183BF6EA0DEC0196226F5E 123460~|~1~|~1~|~01/SAF~|~Safety improvements on Ohio River Rd.~|~21 - Safety~|~04325CE9B2A1615ABBDCF34349067CAC7B7E1A31 102568~|~1~|~1~|~01/IMS~|~Plan split for roadway work on BUT-75 and included ramps~|~05 - 4R Maintenance - Resurfacing~|~34F10F4C290893FDBF118775B12E9E8A64B88C65 102568~|~1~|~2~|~02/NFA~|~Retroactive fuel adjustment~|~05 - 4R Maintenance - Resurfacing~|~FF0B4294F295119B9C58E26B8D4405327852BAC4 124812~|~1~|~1~|~01/BRO~|~Repair bridge carrying SR 150 over Short Creek by encasing pier piling.~|~47 - Bridge Preventive Maintenance~|~6B688874988195BAD8DB8F4DE00561166C993762 100638~|~1~|~1~|~01/STR~|~Resurfacing HOL-83 from the COS Co. Line to US 62 and from Millersburg to Holmesville~|~05 - 4R Maintenance - Resurfacing~|~82770A2445243F87D53071B009EC30B6C5C803FD 92852~|~1~|~1~|~01/STR~|~ROS US50 37.05 Slide Repair On US50, project is 0.63 mile west of the Vinton County line. 01/STR/OT/State~|~21 - Safety~|~6BAA77ADD7CB542A919AC6B74A1C0757716AA978 83046~|~1~|~1~|~01/NHS~|~Resurfacing TRU SR 11 from 19.02 to 28.47~|~05 - 4R Maintenance - Resurfacing~|~461C90A60DBB556B98554849A048BF5A47570DA1 83046~|~1~|~2~|~02/NHS~|~Deck overlays and minor work to the linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~247917DDDB084050667502C20FEF72808CA693D0 104164~|~1~|~1~|~01/NHS~|~Highway Lighting~|~44 - Other~|~331D778DE5D18289A751BE0030DAB3D5941B2273 119673~|~1~|~1~|~01/NFP~|~Culvert Replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~51A17F59123CB62B03C4D9C93C80B1DCC291B1BF 93827~|~1~|~1~|~01/BRO~|~Replace the existing structure (SFN 1862650) over the east branch of the Rocky River using 80% Municipal Bridge funds with 20% Local matching funds.~|~10 - Bridge Replacement~|~F3DCFA03E0EAAFCA5C09005F9815C0EBD590FC73 93827~|~1~|~2~|~02/NFP~|~100% local participation for sanitary and lighting work items.~|~10 - Bridge Replacement~|~E97D2AF729643CB02A39EE5EA77DD8DFB690996D 121745~|~1~|~1~|~01/MPO/AKRO~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C091EDDB2FB85367BFF9882BCFC76509A6ED8F06 96403~|~1~|~1~|~01/NFP~|~New Brown County ODOT Garage~|~01 - New Construction~|~124E032478652F35D8B59E313767436BB0259FF1 99629~|~1~|~1~|~01/STR~|~Split for all pavment work at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~4CCD41F57AEECE7E83E17A3AB79F306DE0FE8B1A 122120~|~1~|~1~|~01/BRF~|~replace existing deteriorated bridge (SFN 0933635) using design-build. widen approaches and update safety features.~|~10 - Bridge Replacement~|~E455E3EAC21C97CDED1B123319C661F5D59A47F3 93680~|~1~|~2~|~02/S>2~|~WOO-65-13.45 Culvert~|~04 - Reconstruction - No Added Capacity~|~1C1F5A801E10C02A9018BAD214AC4BE49CD8875C 93680~|~1~|~1~|~01/STR~|~WOO-65-5.63 and WOO-65-9.38~|~04 - Reconstruction - No Added Capacity~|~7F4C0928D76ABA61A21CE6E3F4A004397A731AEF 126248~|~1~|~1~|~01/SAF~|~Install raised crosswalks ~|~28 - Facilities for Pedestrians & Bicycles~|~2CA858BFC72CB18D91AF790E222E01997FE91F4E 114978~|~1~|~1~|~01/STR~|~All work is in this plan split funded by district allocations using SACs 4PF7 (80%) and 4PS7 (20%).~|~05 - 4R Maintenance - Resurfacing~|~5D739D5200A8C09D24BF3435BCB094741115C5BA 125336~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~E406E0BAD54A1B601B25B4EED3784CE9C4018D33 112979~|~1~|~1~|~01/IMS~|~Rehabilitate bridge GRE-71-0150 that carries Smith Rd over I-71 by repairing the backwall and GRE-72-0029 that carries SR 72 over I-71 by replacing the deck and painting the structural steel.~|~13 - Bridge Rehabilitation~|~A46DAFF0E252D7E0489BA43B2026C64C5A5C9CA8 117652~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~5FBF72A59C230ADB3B67733008DF6D2C93F44F34 120026~|~1~|~1~|~01/NFP~|~added plan split.~|~05 - 4R Maintenance - Resurfacing~|~28C01C852FCBEC9E78961E57B503235FAEFF9233 97841~|~1~|~1~|~01/BRF~|~OBPP replacement of SFN 0730009~|~10 - Bridge Replacement~|~C48722F01ADAC48F68AB8F736CE1E99071442CC6 125212~|~1~|~1~|~01/S5K~|~Plan split for resurfacing of SR-2 from SLM 7.00 to 7.46 including the replacement of 3 conduits~|~04 - Reconstruction - No Added Capacity~|~712A6E7B5E083A623D081CBABCE39C97F80E9C5F 101948~|~1~|~1~|~01/NHS~|~Replacing linked structure.~|~~|~282CDD7651C2E8D8A5B144D68D391CF0169BFD48 119746~|~1~|~1~|~01/NFP~|~Creating plan split for TED involvement~|~~|~C39ACEF3A045572E8CC29ACF26D04FD445381E74 111115~|~1~|~1~|~01/SAF~|~HSIP CEAO funding at 80% for intersection and sight distance safety improvements~|~21 - Safety~|~4F9CDF8DDC7D065412766366EC8ABE616851F06A 98668~|~1~|~1~|~01/BRF~|~JAC CR29-8.73 (SFN 4031024)~|~10 - Bridge Replacement~|~08D2A34DC5E8B25B9FF786AEBED8265F8C9686B8 114671~|~1~|~1~|~01/IMS~|~Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71 and bridge HAM-42-0235R which carries US 42 Northbound over I-71 Southbound, and bridge HAM-71-0822R that carries a ramp from Rdige Rd to Southbound I-71 over Northbound I-71. ~|~~|~9F01AF01F3000E2A393C16D114626FBDD21FCD3F 83846~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7-0005 (100% State) - Annual contract for replacement of RPM's within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4A795D7C53B6F052AD8DB068A2A4126C0728614D 119435~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with Repairs WAY-302-3.859 to 13.929~|~05 - 4R Maintenance - Resurfacing~|~B42F1AD1DC52AC9981EF0E85424B9656933EEE3A 119435~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs WAY-302-3.82 to 3.859~|~05 - 4R Maintenance - Resurfacing~|~5F712F2D6A28F98EFCE857975C109C3984983D02 125493~|~1~|~1~|~01/MPO~|~80% OKI CMAQ (4TB7/KI08), 20% local match, split for eligible items. ~|~21 - Safety~|~8AE7DFEF269D2B10BFC854CD87820BAE71A05670 94453~|~1~|~1~|~01/NHS~|~Replace supestructure on two continuous slab bridges - COL-11-1995L (SFN 1500937), COL-11-1995R (SFN 1500961), and provide new MSC overlay on two continuous slab bridges COL-11-2335L (SFN 1500996) and COL-11-2335R (SFN 1501054). The approach slabs on the two 1995 bridges will also be replaced where as a new overlay on the approach slabs will be provided on the 2335 bridges.~|~13 - Bridge Rehabilitation~|~BDFA9896E9279D1CA4296C50DFBC16DB7B919741 119120~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~9FCE4214C34484B083780775CF0C5D6DBDA58C26 102779~|~1~|~1~|~01/NHS~|~This plan split is for bridge on NHS route.~|~13 - Bridge Rehabilitation~|~56E89B8B6F96373E70C61D78514133CA6AFBC684 120341~|~1~|~1~|~01/IMS~|~All work associated with HAM-75-1192R bridge~|~13 - Bridge Rehabilitation~|~09D8E18CCE40F14A518ACE36F4F068BC8E6B6037 120341~|~1~|~2~|~02/IMS~|~Plan split for the resurfacing on HAM-75 in the project~|~05 - 4R Maintenance - Resurfacing~|~22AE16D89359E4982CF12168E70542AA26EAA999 120341~|~1~|~3~|~03/IMS~|~Plan split for concrete patching on 3 bridges: Galbraith Rd, Clark St, and Davis St.~|~13 - Bridge Rehabilitation~|~E0FF3947E5D0D967278548E01A3D904071E7C7C5 115824~|~1~|~1~|~01/S5K~|~Rehabilitation of Bridge SFN 1600427~|~13 - Bridge Rehabilitation~|~4E484FD14A6796D284BD3FE6B4A772C77318F2FF 93245~|~1~|~1~|~01/MPO~|~Reconstruction and widening from 2-5 lanes on CR 25A from Michaels Road to Evanston Road. Project will also install new curbs, ADA trncated dome handicapped access ramps, storm sewer system, utility relocations, street light, and restoration of traffic signage upgrades.~|~03 - Reconstruction - Added Capacity~|~DBF3219E2E0778599E1044708C527E2E1ADAC98A 119755~|~1~|~1~|~01/SAF~|~Various pedestrian improvements at 6 locations across the City of Wilmington including sidewalk, high visibility crosswalks, RRFB's, curb bump-outs, and ADA curb ramps.~|~21 - Safety~|~58960A599079854BF9DACD20476C7294F9A9463C 105937~|~1~|~1~|~01/MPO~|~resurfacing work eligible for federal-aid~|~04 - Reconstruction - No Added Capacity~|~7BDFBAF2BC63C4A755378CC78DE5004E2D242C1D 105937~|~1~|~2~|~02/NFP~|~Split for 100% local funding~|~04 - Reconstruction - No Added Capacity~|~4A00CC7D6A38432EE867BF3D36AA0AB635EBE404 86945~|~1~|~1~|~01/STR~|~Plan Split for STA SR 183 0.00 to 3.50~|~05 - 4R Maintenance - Resurfacing~|~BEBC9EFC8351F41690A0579E85C7D25D91925C74 86945~|~1~|~2~|~02/STR~|~Plan Split for SFN 7605609 STA-SR 183-03.26 over Big Sandy Creek~|~13 - Bridge Rehabilitation~|~F3E7DA42D8AD90B8DAD2A3644B288D0673751B06 93363~|~1~|~1~|~01/SAF~|~Project includes replacing existing non-standard guardrail and installing new guardrail where needed. Berm work will be performed and guardrail will be added where vertical drop-offs are a concern.~|~21 - Safety~|~345759F828BF0DB845CF12ED6BD38E0C37788B98 119223~|~1~|~1~|~01/IMS~|~Mowing in District 8~|~44 - Other~|~A55A555317BC4EB8C99B3BB47D8CB1ACC7523549 120996~|~1~|~1~|~01/NHS~|~Plan split for pavement work on HAM-125~|~05 - 4R Maintenance - Resurfacing~|~E41575F081C49AAC87A77708C470A1949D988EA4 100387~|~1~|~1~|~01/IMS~|~SUM IR 271 from 0.00 to 2.33.~|~05 - 4R Maintenance - Resurfacing~|~8C2CA076040729388AB9EE516C4E76336E16AAFF 100387~|~1~|~2~|~02/S>2~|~SUM SR 21 from 19.57 to 20.77.~|~05 - 4R Maintenance - Resurfacing~|~615B333CA7DCA3C44335609F4EF6C50141F75207 113628~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~33D613821096E119AE75CD405B403C7F316FC610 122850~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~38222FBAFE1B2D2716465BE24CC65EFACB13A30C 93323~|~1~|~2~|~02/NHS/CAMB~|~"02/NHS/PV/CAMB" - District Preservation Urban Paving in City of Cambridge - 4PF7 (80 Federal) / LNTP (20% Local Match) - No CAP - Resurfacing of SR 209 within project limits to be provide per ODOT urban paving at 80/20~|~05 - 4R Maintenance - Resurfacing~|~4C76DFEC6818A79CE20CF823408ADB3CC34143E7 93323~|~1~|~1~|~01/ENH/CAMB~|~"01/ENH/OT/CAMB" - Enhancement Program Funding 4B37 (80% Federal) / LNTP (20% Local Match) - CAP at $300,000.00 Federal Funding) - City of Cambridge project that includes Ehancements along Southgate Parkway from Wheeling Avenue to the south end of Southgate Parkway bridge. Enhancements include the installaton of new sidewalks lighting and landscaping.~|~31 - Landscaping & Other Scenic Beautification~|~9E0750CC2504F59E27D6C3E6AAEE60B53530EDD4 99659~|~1~|~1~|~01/NFP~|~Raised Pavement Markers maintenance contract district wide.~|~21 - Safety~|~9825FB410D1DEF7973549FA0D2501E85D395A4FA 102470~|~1~|~1~|~01/S<2~|~Resurfacing COL-267~|~05 - 4R Maintenance - Resurfacing~|~FBBAE823E28B72B36909D0F78007337404F19387 120611~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~~|~C79407B8B39C0E2B01EF6EC114F090000342B938 121261~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~B5775F1A242722DA3E178F9EFB767BCBCCCE33EF 121261~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~C1BD888BCE3F0AA3386B9E91F6B5C4405A2501B7 98385~|~1~|~1~|~01/STR~|~Chip Seal of ATB SR 46 from 0.00 to 15.02 and TRU SR 46 18.45 to 23.64.~|~05 - 4R Maintenance - Resurfacing~|~98E11681659729EC5756074F3A5A774BD5541FD0 113403~|~1~|~1~|~01/SAF~|~Split for ramp widening using safety funds~|~21 - Safety~|~98AB07DB44071AF7C0EFA99E9DEF9DE243EC21E7 113403~|~1~|~2~|~02/BRO~|~Split for bridge widening work~|~21 - Safety~|~DD7998EC6F164977E1838CCDDF957B1D0287E460 101433~|~1~|~1~|~01/NHS~|~NHS AC Overlay without Repairs~|~05 - 4R Maintenance - Resurfacing~|~B03060FCB922B8325F32AC9B7AE0BAFAA8237869 101433~|~1~|~2~|~02/S<2~|~S<2 Overlay without Repair~|~05 - 4R Maintenance - Resurfacing~|~89605F6E435280AFDD182B03F260FCEEAFE375EA 102234~|~1~|~1~|~01/NHS~|~Widening SR 14 between Diagonal Road and Portage Pointe Drive in the City of Streetsboro.~|~04 - Reconstruction - No Added Capacity~|~F9E6EC4DF2638ECA38A85F34923828F2C0986F91 102234~|~1~|~2~|~02/NHS~|~Portage County waterline replacement.~|~43 - Utilities~|~4FCB2BDD87736D67699BBA1A48F8FB16100E5F5E 102234~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~56715BC54608B88C59BB9D48D28509F9B914588C 108702~|~1~|~1~|~01/NFA~|~Replace Etna Street bridge over Mason Run in City of Whitehall~|~10 - Bridge Replacement~|~6B0C950A1D933FE078021A8B82151B2B8D2AB815 108702~|~2~|~2~|~02/NFA~|~Replace Elbern Ave bridge over Turkey Run in City of Whitehall~|~10 - Bridge Replacement~|~643B17DF8DE0E7FB109CCD31756DCD0B6AAF5A56 97246~|~1~|~1~|~01/S<2~|~Pavement reconstruction with the City of Greenville. Project includes pavement reconstruction, curb and gutter, sidewalk, curb ramps, signing and pavement markings.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~78CF4F8233E21F7BA37E15CA7DC7F1FB32BB9B79 107556~|~1~|~1~|~01/SAF~|~Systematic replacement of signs in Fayette and Pickaway counties. Other plan splits may be needed depending on routes and locations involved.~|~21 - Safety~|~820310B9410ECB2ABFEBBA9E623BFE053BF07FA8 118564~|~1~|~1~|~01/IMS~|~Slope repair at the I-76 and Porter Rd structure, NW quadrant.~|~~|~B9B388C5849E54E15E9AA4C78107182EEC042721 106333~|~1~|~1~|~01/STR~|~Bridge Replacement ? Presstress box beam bridgeRIC-SR-96 16.580 SFN (7005474) WHETSTONE CREEK Major Rehabilitation ? Deck replacement (004) New Construction ? Superstr repl (003) ~|~10 - Bridge Replacement~|~E03C18ADC85BEE1D7F1B45EB032BB54BACE4872E 100264~|~1~|~1~|~01/NFP~|~Two Year Construction Inspection Agreement to provide general and bridge inpsection services District-wide. Estimated fee is $1.0M.~|~17 - Construction Engineering~|~3154E066D7DA589BD0C6C84089F0B9F727E75885 121604~|~1~|~1~|~01/STR~|~Culvert replacement project. NOB 146 11.79 (1809504). Rural other federal aid funded 80 Federal/20 State.~|~~|~25EE0EC92D569B798D0109FA9219E108BD9590C7 77305~|~1~|~1~|~01/BRO~|~01/BRO/BR/ Work to replace the bridge. The federal funds are BR funds from CEAO.~|~10 - Bridge Replacement~|~2C1D9745EC77C2E65070DA2D73A066F35C219A01 77305~|~1~|~3~|~03/NFP~|~100% locally funded esthetic items that were determined to be not eligible for federal funds. Funds provided by Allen County.~|~44 - Other~|~324A4FF8AF297A7B80EF17A77B5B9807DB0F5089 77305~|~1~|~2~|~02/CMQ~|~02/CMQ/OT/ CMAQ eligible work. CMAQ eligibility was approved March 20, 2012 for "the construction of a roundabout at the intersection of Shawnee and Ft. Amanda Roads as well as the constructon of sidewalks and a shared use path." The MPO-CMAQ funds SAC 4TB7 should be used before the MPO-STP funds SAC 4TA7.~|~21 - Safety~|~BFEA780816239880AEC6F050588ACD6ADF4B8683 99709~|~1~|~1~|~01/NFP~|~Epoxy pavement markings along various routes throughout District Four.~|~21 - Safety~|~6690C4A915C444F51AE6250AA01DF5E5A6E288FE 91762~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. MOE 78 9.18-15.05. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~77F33224AC7ED3F224E5094B78D2464B9B57351E 111993~|~1~|~1~|~01/SAF~|~Guardrail repair (ding and dent) contract for CAL 2026.~|~~|~70956F73EA3A1B4EAF648147272BCACCFB71359C 89458~|~1~|~1~|~01/IMS~|~Total Reconstruction of existing 4 lane segment of SUM-IR 271 from 12.62 to 15.24.~|~04 - Reconstruction - No Added Capacity~|~86E2B7B7934EAC05A1DA3B8B70322D88B050AE2E 89458~|~1~|~4~|~04/NHS~|~Total New Construction of the widening portion of SFN 7709390 SUM IR 271 12.62 L and SFN 7709420 SUM IR 271 12.62 R over SR 82 and SFN 7709544 SUM IR 271 1413 R and SFN 7709455 SUM IR 271 1413 L over Norfold Souther RR and Ledge Road~|~10 - Bridge Replacement~|~87C8838EB1826344E483CA01F9D8AB5FAC22F96E 89458~|~1~|~2~|~02/NHS~|~Total New Construction of 2 lanes (widening portion) of SUM-IR 271 from 12.62 to 15.24.~|~03 - Reconstruction - Added Capacity~|~EB606DF56744CA58FFD6EA68308C86F825591035 104509~|~1~|~1~|~01/BRO~|~Work eligible for CEAO LBR funding.~|~10 - Bridge Replacement~|~E93E6596DE87FD5CE1FC4246A366BBFE81C4B523 126591~|~1~|~1~|~01/STR~|~Construct roundabouts and other incidental pavement on US 62~|~17 - Construction Engineering~|~1E545EFD287F214EE2825C830D3DCBC866734465 126591~|~1~|~2~|~02/IMS~|~Work on ramps~|~04 - Reconstruction - No Added Capacity~|~3A76E81D630DD89FCC2B28A58BCAEF27A06D7B92 85971~|~1~|~5~|~05/NHS~|~Installation Dilemma Zone detection and Stop Bar detection at US 22/SR 56 and US 22/US 23SB Off ramp intersections~|~05 - 4R Maintenance - Resurfacing~|~6E85442E8A889C3EDCDEF9037DE9E46D3BA22F81 85971~|~1~|~4~|~04/STR~|~Removal of Prepare to Stop When Flashing signs and installation of dilemma zone detection and stop bar detection at US 22/SR 104 intersection~|~05 - 4R Maintenance - Resurfacing~|~AFF4675EA52BAB945F07A564066516445D970D5C 85971~|~1~|~2~|~02/NHS~|~Federal/state resurfacing of PIC-22 (NHS)SLM 15.73-17.34 (Mill Rd to enter Circleville corp)~|~05 - 4R Maintenance - Resurfacing~|~DDF2FEB3A98450B724A22DD32E8E0768CEF873E7 85971~|~1~|~1~|~01/STR~|~Federal/state resurfacing of PIC-22 in the rural area.SLM 14.36-15.73 (SR-104 to Mill Rd)~|~05 - 4R Maintenance - Resurfacing~|~1D0339664BCB6B51EDFA58A684D8D8DBFC83BBF7 85971~|~1~|~3~|~03/NHS~|~Federal/state funding (non BR) for patching and sealing on 3 bridges:6500285 PIC US22 16.08 Intersect: Scioto River Overflow6500307 PIC US22 16.29 Intersect: Scioto River Overflow6500358 PIC US22 16.99 Intersect: Over Scioto River~|~13 - Bridge Rehabilitation~|~5F3099D7B53A01F0489CF2B9BDE0A4F51CA19A30 121566~|~1~|~1~|~01/IMS~|~Interstate Plan Split~|~05 - 4R Maintenance - Resurfacing~|~F2FD6F14DE50C7163A8EE6954B1CA0A5BC77BC49 106304~|~1~|~1~|~01/NFP~|~Install raised pavement markers along various routes throughout District 4.~|~21 - Safety~|~718D42A89DFB4176B69A72E553AD6A2EF9D64A34 91561~|~1~|~1~|~01/BRO~|~Replace existing slab bridge (HOL-62-0837, SFN 3801144) with a four-sided precast concrete box.~|~10 - Bridge Replacement~|~112A8161C73EC811FE30A9FAA8A51433598C39F6 102402~|~1~|~1~|~01/NHS~|~Resurfacing US 30~|~05 - 4R Maintenance - Resurfacing~|~E469534F35580334683D5465082B42219B6D6135 102402~|~1~|~2~|~02/SAF~|~Centerline rumble stripe work~|~21 - Safety~|~535D45FAA8C84B85AD51BD4933B371B5B209E271 102402~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~~|~D00DE976680D8B7066B5A7EB1ECC46DB496C1C74 116905~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG TR 231 0.927, SFN 5337542.~|~17 - Construction Engineering~|~E0200CBF8C20A3F4D26F48795EA91F94D3CC08D0 124785~|~1~|~1~|~01/IMS~|~Plan split generated for Conduit replacement.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8B30AF50EFCDFE1EF7F07382E6C60EDC55D458A8 108921~|~1~|~1~|~01/STR~|~Culvert replacement.~|~04 - Reconstruction - No Added Capacity~|~BB768322C358A63788CE302FC9433C298AE13B4F 96805~|~1~|~1~|~01/NFA~|~It is proposed to replace culverts in Brush Creek State Park in Scioto County.~|~17 - Construction Engineering~|~46CEA32EE267021263CFAB53CEDA4B223263D3E8 113887~|~1~|~1~|~01/STR~|~AC Overlay with Repairs.~|~05 - 4R Maintenance - Resurfacing~|~AC73E8A7FF28C508A152B687154155AC4E10C5AB 113887~|~1~|~3~|~03/S5K~|~AC Overlay with Repairs / Smoothseal~|~05 - 4R Maintenance - Resurfacing~|~1E7547DAF1EAFDEF54A6A53544766F3F82D84438 113887~|~1~|~2~|~02/STR~|~Bridge rehabilitation work to be completed with overlay project~|~13 - Bridge Rehabilitation~|~214C008DFBE813F9FE327746B59F4A64AC7CC4D2 113887~|~1~|~4~|~04/NHS~|~Bridge rehabilitation on SFN 1701843 CRA-30-18.648~|~13 - Bridge Rehabilitation~|~01F9D945A6B61AB6CA13D7425E02E81BF11C0003 113887~|~1~|~5~|~05/S5K~|~Bridge rehabilitation on SFN 1703366 CRA-181-0.639~|~13 - Bridge Rehabilitation~|~40267BC49536175B71E54603537A7E8B98BED4CF 113887~|~1~|~6~|~06/SAF~|~Railing replacement SFN 1703633.~|~21 - Safety~|~388479D89D850117323E3E84E3CD9C0094F35CF8 113887~|~1~|~7~|~07/NFP~|~Catch basin reconstruction. 100% Crestline.~|~04 - Reconstruction - No Added Capacity~|~49DC8520D1C24C65CCB30CF518FA2ABB50D83FC8 122398~|~1~|~1~|~01/NFA~|~Plan split for resurfacing work at Dempsey Sandusky Bay Fishing Access~|~05 - 4R Maintenance - Resurfacing~|~2BBFD9CCD5283B2557C84C010B278740C34E08BE 98796~|~1~|~1~|~01/BRF~|~Rehabilitation of Bridge No. GRE-TR 6-0229 (SFN: 2934744), the existing timber truss covered bridge that carries Ballard Road over Caesar Creek.~|~13 - Bridge Rehabilitation~|~269E2B17BE77BFDBA12A4D3ED562BA4AAA056C39 117488~|~1~|~1~|~01/NFA/SUCE~|~Superstructure replacement.~|~13 - Bridge Rehabilitation~|~F88F21AB90D67729AC26372810F10B8FCA139B28 111375~|~1~|~1~|~01/SAF~|~All work in this project.~|~21 - Safety~|~B30B6A46967271E61E6E97D1D327836EBB42A709 122058~|~1~|~1~|~01/NFP~|~Electrical maintenance contract on various routes.~|~21 - Safety~|~445842E27161C4DE53FC48ACF92D76FF3167937E 102295~|~1~|~1~|~01/NHS~|~Emergency Bridge repair project. Repair steel beam from vehicle damage, on MEG 833 0489 L, SFN 5300894. Sell as Type C Emergency Contract. NHS route funded 100% state.~|~13 - Bridge Rehabilitation~|~EACFB1CF7C4EFD9F8E1F7B1631BE72A0CEA9A392 119531~|~1~|~1~|~01/BRF/POCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~071759F0AE1E0F72F04AAD4501AA2ABE820A5772 109563~|~1~|~1~|~01/SAF~|~This is the district's systematic RPM replacement maintenance contract of prismatic reflectors that have lost reflectivity or are in need of replacement.~|~21 - Safety~|~8280305A6332B7B3060FCFFAA6ECDAF0F2B178F9 124265~|~1~|~1~|~01/NFA/PICK~|~Improvement of Pedestrian Facilities along East Street in the City of Pickerington.~|~28 - Facilities for Pedestrians & Bicycles~|~0963CFC2E616F9EE37B0CD45BE3E2C5A70D0836B 119126~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~49758911F1CAABED78252B1D805C7F7278D36A01 119126~|~1~|~2~|~02/STR~|~Resurfacing.~|~~|~B4F00E4FFD32B51A5E8A93C7F7D690BF7AFF50E7 106705~|~1~|~1~|~01/STR~|~See linked culverts.~|~04 - Reconstruction - No Added Capacity~|~9AC1F1C4901E6901EE6B15B66BA415DBDC61CCD3 106705~|~1~|~2~|~02/NFP~|~Replacement of 72"x96" culvert in Pymatuning State Park.~|~04 - Reconstruction - No Added Capacity~|~A7011497EDACF69A2FC7DB001A4E4C5CEC80B24C 126425~|~1~|~1~|~01/STR~|~Asphalt Concrete Overlay with RepairsWAY-3-27.249 to 28.349Fine Graded Polymer Asphalt Concrete OverlayWAY-3-20.131 to 27.249~|~05 - 4R Maintenance - Resurfacing~|~88013A1EF30B80064CAC38004113BFCDE692D954 126425~|~1~|~2~|~02/S5K~|~Fine Graded Polymer Asphalt Concrete OverlayWAY-3-19.261 to 20.161~|~05 - 4R Maintenance - Resurfacing~|~0B9522295A28B6F5F8A4B6A09BC32D528DA334FC 91741~|~1~|~2~|~02/NFA~|~Two-Lane resurfacing project with pavement repairs. NOB SR 513 1.00-9.38 on Minor Collector/Non-Federal Aid route. 100% State funded.~|~05 - 4R Maintenance - Resurfacing~|~685F53A5B4F8DD58B99F6E47407169EF630759D9 91741~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project with pavement repairs. MOE SR 537 3.84-4.98 and NOB SR 513 9.46-12.45. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~D8F4FC63A37EDC9A913A6EEA3ADA930C1665107F 110424~|~1~|~1~|~01/SAE~|~Resurfacing and restriping of Liberty Fairfield Road to add a southbound right turn lane. Modification of the traffic signal at SR 4 and Liberty Fairfield.~|~21 - Safety~|~BF16EFAE3D1B323A3309C77A313DB312ED6F244E 126709~|~1~|~1~|~01/IMS~|~Expansion joint replacement.~|~47 - Bridge Preventive Maintenance~|~1D99BED895EDDB02FC03A73FA8176CB37D71E7B3 122459~|~1~|~2~|~02/BRO~|~Second plan split for construction contract costs above the Project Cap for 4PR7 (PROTECT) Funds.~|~48 - Bridge Protection~|~54F1F3AE81E5C77F94B642445D8D0D8062231AA1 122459~|~1~|~1~|~01/BRO~|~PROTECT bridge carrying SR 39 over the Tuscarawas River.~|~66 - Resilience Improvement - Highway Project ~|~BA16A2F9F1939AB50D494FACD3E324B0021D0D29 83005~|~1~|~1~|~01/SAF~|~This project will utilitize federal funding from two different sources: 90/10 federal/local funding split using federal safety funds and 80/20 federal/local funding split using NOACA STP funds.~|~21 - Safety~|~D2D77F4743283C2F11BFB90D04EB00DC474CA821 118516~|~1~|~1~|~01/SAF~|~ATH US 50 33.58~|~21 - Safety~|~ACBF7C81A41FA05E89842DA89B58340C4AF079EE 94448~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - CEAO LBR Funding 4B87(80% Federal) / LNTB(20% Local) - CAP of $437,950.00 @ 95% Federal using Credit Bridge with a CAP of $69,150.00 - Replacement of 4231112 KNO CR27 1.17 Intersect: Big Run; BR Eligible for Replacement: Length=29 SD/FO(1) SR=28.2 DSR=5~|~10 - Bridge Replacement~|~3F8260745845384EDB8658D5064B32398441B720 84703~|~1~|~2~|~02/STR~|~LAW SR141 8.43 - 16.37Brdg Rehab4402294 LAW SR141 8.71 Intersect: Dog Fork4402405 LAW SR141 11.71 Intersect: Deloss Creek4402472 LAW SR141 11.94 Intersect: Deloss Creek4402502 LAW SR141 12.57 Intersect: Deloss Creek4402529 LAW SR141 12.98 Intersect: Symmes Creek4402588 LAW SR141 16.18 Intersect: Long Creek80/20 Split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~1CA965B22D77D4F24D82A045F2558B0F5E429261 84703~|~1~|~1~|~01/STR~|~Resurfacing of 2-Lane Highways. 4402308 LAW SR141 8.83 Intersect: Trib Of Dog Fork4402332 LAW SR141 9.21 Intersect: Trib Of Dog Fork4402367 LAW SR141 11.57 Intersect: Trib Of Deloss Creek4402545 LAW SR141 15.3 Intersect: Trib Of Brushy Branch80/20 split01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~4208DAAC5965AF03733F1F2DA9475C64B69EDFF1 95779~|~1~|~1~|~01/STR~|~SEN-162 from SLM 0.00 to 9.51~|~05 - 4R Maintenance - Resurfacing~|~991B0449E6071DB838D947DF4EAFCD82AA02FDD6 125957~|~1~|~1~|~01/SAF~|~Lighting or Signal project in FY2032.~|~~|~15042BD8B91EA5AFE6D2D527C1DCDD64DEED81A9 95560~|~1~|~1~|~01/NFP~|~Repair Fiber Optic Cable.~|~44 - Other~|~C5B02C4761F7F76D1B74B45AE93788536D63D9F9 85387~|~1~|~1~|~01/NHS~|~80/20 federal/local split for all Urban Paving eligible work.~|~05 - 4R Maintenance - Resurfacing~|~04359FF7958968D2454360E11F7E1A09D6694CAB 85387~|~1~|~2~|~02/NFP~|~Proposed work that is not federal-aid eligible i.e. 100% local~|~05 - 4R Maintenance - Resurfacing~|~54E208FEEF57ECEB7F0C923515C68BB20445817B 102999~|~1~|~1~|~01/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~3269A6FF98833A28CC2D95070E00B5CE44EAE1E8 102999~|~1~|~3~|~03/NHS~|~AC Overlay with repairs.~|~05 - 4R Maintenance - Resurfacing~|~81F5CCA511DCC8774C330D14441EF94F5227221B 102999~|~1~|~2~|~02/S5K~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~60574EA75DF0F348EEF2EEE70F11C95474BC3E17 102999~|~1~|~4~|~04/S5K~|~AC Overlay w/repair in the city of Bellefontaine~|~05 - 4R Maintenance - Resurfacing~|~6086F5D8025DB2CA2BFE4D3B57FCBFF8AD300AF1 124935~|~1~|~1~|~01/MPO~|~Resurfacing of Neeb Road from Cleves-Warsaw Road to Muddy Creek Road~|~~|~8EF5EA84109BA5989B402D770CE37125A422CF6A 102700~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using an asphalt overlay with repairs treatment. GAL 7 19.34-25.76. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A7985B9FEAF5E6A8D270FE63ADAE85A1C665AB5A 100938~|~1~|~1~|~01/NHS~|~NHS Minor Rehab~|~05 - 4R Maintenance - Resurfacing~|~514EAFFD41FC7997697B3AF24201415EC36F602F 100938~|~1~|~2~|~02/NHS~|~Bridge work not determined.~|~13 - Bridge Rehabilitation~|~5F1EEB60F26E5C1B9141C28D2C684CE97DF97AFD 92148~|~1~|~2~|~02/STR~|~Culvert repair on HOC-56-11.11. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~1BF29884D54F5A0D4294FF68ABC590F683F34A37 92148~|~1~|~1~|~01/STR~|~Bridge replacement project. HOC-56-11.30 (SFN 3701298), HOC-56-12.38 (SFN 3701328). Rural other federal aid funded 80 federal/20 state.~|~10 - Bridge Replacement~|~AA3E22BA376BFCA72D21C0A04FB0F94AD5E60B0D 122347~|~1~|~1~|~01/MPO~|~Plan Split for TMACOG Carbon Reduction Program and CMAQ funding.~|~~|~0DB0BED9840E1C713456E9807C7FF5386C6FBC7A 109805~|~1~|~1~|~01/STR~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~98AFE4329B14E9C863BB15D6182F4660AA54E1E0 91881~|~1~|~2~|~02/S<2/COSH~|~"02/S<2/OT/COSH" - 100% Local Funding 4BG7- No CAP for Local Funding Funding - For ADA ramps and any other items requested by the City at 100% their costs.~|~05 - 4R Maintenance - Resurfacing~|~0D8DA3B4093747C4CD8F643E183BD4210D6678A7 91881~|~1~|~3~|~03/S<2/COSH~|~"03/S<2/OT/COSH" - District Preservation Marking Pavements 4PF7(80% Federal) / 4BG6(20% Local-OPWC) - CAP of $324,999.00 for total Ohio Public Works Commission (OPWC) Funding Then switch to 4BG7- Striping after Urban Paving resurfacing in the City of Coshocton Cos-SR 541-18.72-23.62~|~05 - 4R Maintenance - Resurfacing~|~3AC684D5FAA5CD87DE15AC1CD86C4D561DEA76E0 91881~|~1~|~1~|~01/S<2/COSH~|~"01/S<2/PV/COSH" - District Preservation (Urban Paving) 4PF7(80% Federal) / 4BG6(20% Local-OPWC) - CAP of $324,999.00 for total Ohio Public Works Commission (OPWC) Funding - Resurfacing in the City of Coshocton Cos-SR 541-18.72-23.62~|~05 - 4R Maintenance - Resurfacing~|~678FDE771280E116694FC1458B66C39FA7C04091 89435~|~1~|~1~|~01/STR~|~Landslide repair using drilled shafts. GSM funds. Work length approximately 250 ft. WAS 7 53.00-53.05. 80% Federal/20% State.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~36178799AAA6616ABBD81C32F6133D99F24B5D18 110562~|~1~|~1~|~01/STR~|~Replace Bridge size culvert on SR 129 over a tributary of Lick Run~|~10 - Bridge Replacement~|~C4B32AD929305657F149D72EEC7BBBCAC5476C1F 77572~|~1~|~1~|~01/STR~|~Federal/State funding for bridge replacementSFN 4904265, MAD-665-3.96 over Deer Creek01/STR/BR/~|~10 - Bridge Replacement~|~4970850A0D79B2CA5BE6FD022EFB1FD3C411D0B1 116486~|~1~|~1~|~01/NFA~|~D09 PM FY2028.~|~21 - Safety~|~356A1C63AF2DB6CDDA3A1F675AF4C2047F0F7F0F 124549~|~1~|~1~|~01/IMS~|~Sign and Truss Replacements~|~21 - Safety~|~4BD6330DE8F8319BD4753E9DCAB94CFFFA0D437E 108750~|~1~|~1~|~01/SAF~|~Longitudinal pavement grooving at interchange ramp termini. The cost is for purchase contract equipment rental only. ODOT Richland County forces will perform all other related work.~|~~|~1BB7481A5943D142A39A9565FEBCA247FBCFCF65 114298~|~1~|~1~|~01/ENH~|~Pavement markings~|~21 - Safety~|~C48A2BFF739A52FCB62981D276E6D369FEC38E62 102463~|~1~|~1~|~01/STR~|~Resurfacing HOL-39~|~05 - 4R Maintenance - Resurfacing~|~9E44BB3353EE73EC3C49814AB812B9EE46A79F03 102952~|~1~|~1~|~01/STR~|~STP Rural eligible.~|~10 - Bridge Replacement~|~D185A52571304776C3BCF1E848E26C45680D4BF5 84164~|~1~|~2~|~02/STR~|~Bridge painting project. WAS 83 0181 (SFN 8403635). 80% Federal and 20% State.~|~44 - Other~|~E3BC39B00BCBD538463717B21802B238918C2077 84164~|~1~|~1~|~01/NHS~|~Bridge painting project. WAS 7 0976 L & R (SFN 8400091, 8400121) and WAS 50 0946 L & R (SFN 8401470, 8401500). 80% Federal and 20% State.~|~44 - Other~|~F7B3F278C38621B15C267D2E826B4F1BE600FAF4 103703~|~1~|~1~|~01/S<2~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items): CRA-SR19:SLM 00.99 to 02.86 (LT)SLM 01.19 to 02.86 (RT)SLM 02.95 to 04.20 (LT)SLM 02.95 to 04.16 (RT)CRA-SR97:SLM 00.71 to 00.83 (LT)SLM 00.71 to 01.08 (RT)~|~05 - 4R Maintenance - Resurfacing~|~724A22108F57F8913CD0E38E36442DF8F408D075 103703~|~1~|~2~|~02/S<2~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, etc.):CRA-SR19:SLM 00.99 to 02.86 (LT)SLM 01.19 to 02.86 (RT)SLM 02.95 to 04.20 (LT)SLM 02.95 to 04.16 (RT)CRA-SR97:SLM 00.71 to 00.83 (LT)SLM 00.71 to 01.08 (RT)~|~05 - 4R Maintenance - Resurfacing~|~2C6CEDBDE835FB0C3CDB441570DC4C34EFFAED8B 103703~|~1~|~3~|~03/S<2~|~Federal/State: Urbanized Area Outside Corp. Limit (Paving Items Etc?):CRA-SR19:SLM 0.00 to 00.99 (LT)SLM 0.00 to 01.19 (RT)SLM 04.16 to 04.20 (RT)CRA-SR97:SLM 00.83 to 01.08 (LT)~|~05 - 4R Maintenance - Resurfacing~|~F90162A8AD8BA6011B8EB54701BA08EE95AE6D31 103703~|~1~|~4~|~04/SAF~|~Funding for Rumble Stripes Outside of Galion.~|~05 - 4R Maintenance - Resurfacing~|~77AFD946F61733B6CA3CEDFA9B6337375FF9D181 105105~|~1~|~1~|~01/STR~|~Resurfacing on the Rural portion of SR 129: SLM 0.00 to 8.50~|~05 - 4R Maintenance - Resurfacing~|~341EE6D315AB841FC45E6CE4D2E4347931A6C03C 105105~|~1~|~2~|~02/S>2~|~Resurfacing on the Urban portion of BUT-129: SLM 8.50 - 8.76~|~05 - 4R Maintenance - Resurfacing~|~4C04F61C78C7C59DF8A0559D54ED3D59050973A6 113393~|~1~|~1~|~01/MPO~|~Roadway mill and fill in the City of Englewood.~|~05 - 4R Maintenance - Resurfacing~|~35F1DE3135493B44155D88EFC51AAE3050DB5074 121989~|~1~|~1~|~01/S5K~|~Resurfacing and related roadwork in urbanized boundary.~|~05 - 4R Maintenance - Resurfacing~|~214E715CEA5E8BE9CE526701517B86BBC83910E9 111870~|~1~|~1~|~01/NFP~|~Remove and replace bridge. Realign with approach pavement work.~|~10 - Bridge Replacement~|~4667745F820E725654FBC0C416672F6E60763555 87010~|~1~|~1~|~01/NFA~|~Two-Lane resurfacing project using an asphalt overlay treatment. NOB 260 3.75-12.13. Funded 100% state.~|~17 - Construction Engineering~|~9EF78688F0F4E91D89F60AF79F62BB290DC7F4ED 96543~|~1~|~1~|~01/STR~|~Resurfacing ATB US 6 from 5.75 to 20.61.~|~05 - 4R Maintenance - Resurfacing~|~57EE3DC007745086ADA9BC9D638FDE3C62662BBF 96543~|~1~|~2~|~02/STR~|~See linked structures.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D1676EB6088989EC65B525550E9BA833FD350831 96543~|~1~|~3~|~03/NHS~|~See linked structure.~|~13 - Bridge Rehabilitation~|~22C81A15A0D7FF77D4893DF3CB75E4438555C4ED 96543~|~2~|~4~|~04/STR~|~See linked structure.~|~13 - Bridge Rehabilitation~|~DC7222648D5375F717662E514C01D5C0B2DDD4B7 120696~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 37/SR 310 intersection.~|~21 - Safety~|~106E66FDB1C16ED5E45D91DD079314BBB0233D7F 117146~|~1~|~1~|~01/SAF~|~City-wide safety improvements at 7 pedestrian and/or bicyclist crossing locations.~|~21 - Safety~|~E929F308C6AE381B7201598605529CD955C3F215 96006~|~1~|~1~|~01/BRO~|~District Preservation Bridge Fund - 4PF7 (80% Federal)/4PS7(20% State) - No CAP - Bridge rehabilitation on COS-SR 93-5.41 SFN 1601830 Intersect: Over Bacon Run; BR Eligible: Length=114 SD/FO(1) SR=63.2 DSR=4~|~13 - Bridge Rehabilitation~|~263AE68CEE660DB2C7832E605BB34FDFF67EA546 107075~|~1~|~1~|~01/NFA~|~JAC CR VAR PM.~|~21 - Safety~|~EF4FD514CC6E08A284BFBAAD01243DAAE4E44D85 108499~|~1~|~1~|~01/MPO~|~Resurfacing of Waterloo Rd from SR 619 to Barberton E. Corp Limit.~|~~|~7A404326729EB9EBC8F8904ED140CC75A8141785 94231~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~D2431CD53757CD9BD65A3D200F692D9DC44B4243 94231~|~1~|~2~|~02/SAF~|~For pavement markings on the NHS on US 24 in Defiance County. Safety program funds will be used first and are capped. The Safety funding covers the estimated cost of the grooving for recessing the WR markings and the cost of the WR Optics which are added to standard pavement markings to make them wet reflective. These two items are essentially the difference in cost between standard pavement markings and recessed wet reflective pavement markings. We are calling this difference in cost the ?delta cost?. All costs above the safety funds cap will be from the District Preservation Program budget. Funding is 100% federal.~|~21 - Safety~|~66D7C603978404E2D3B201469169572FB08DF15F 117132~|~1~|~1~|~01/NHS~|~This plan split includes all work associated with the project~|~05 - 4R Maintenance - Resurfacing~|~EF7E05A21DB3A42245D1A108AC61FC61E49001B7 122454~|~1~|~1~|~01/SAF~|~Reconfigure East 5th Avenue from High Street to North 5th Street from a four-lane section to a three-lane section with a parking area. Improvements at the East 5th Avenue/Summit Street intersection. Resurfacing.~|~~|~A883D99F971A17C64495B8CD5C6ED7444A5AD063 98822~|~1~|~1~|~01/NFA~|~TID is constructing the Oster Road Project including, but not limited to, roadwork improvements by improving story sewers and sidewalks, a new continuous three lane roadway on Oster Road, from Abbe Road west approximately 1200 feet~|~01 - New Construction~|~ADD1EE669C7026D1ED893F563BFDD32049118657 24073~|~1~|~2~|~02/NHS~|~Pavement and ramp work.~|~05 - 4R Maintenance - Resurfacing~|~B05A6A92A2734C695B55CE3415F11105B52D96F0 24073~|~1~|~1~|~01/NHS~|~Plan Split for SFN 5008662 MAH US 62 18.25 bridge over SR 289, Mahoning River and CSX and Norfolk Southern RR.~|~13 - Bridge Rehabilitation~|~DDC7365D96977FFE82EFFE13621D8581589C70B7 108914~|~1~|~1~|~01/ENH/SOME~|~Transportation Alternative Program Funding - 4B37 (80% Federal) / 4BG7 (15% TRC) / 4BG7 (5% Local) - See CAP Comments - Sidewalks and Drainage on 1) Per-SR 13-27.71 to 28.00; 2) Per-SR 668-16.79 to 16.87; 3) Per-MR 291-00.00 to 00.76; Per-MR 296-00.18 to 00.33~|~28 - Facilities for Pedestrians & Bicycles~|~306BE2C602D3117CD734D5C3916AAAA27E3AE7F6 104063~|~1~|~1~|~01/NFA~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A75532FA4779A22C83E827D68167C810B710F8A5 113926~|~1~|~1~|~01/BRO~|~Repair structure BEL-148-1135 (SFN 0704091) by replacing the backwalls, expansion joints and approach slabs. Railing will be retrofitted. Deck will be patched and sealed. Existing steel beams will be cleaned and painted.~|~13 - Bridge Rehabilitation~|~DD220C62366212377A9A180857DBA3B694E91B58 120104~|~1~|~1~|~01/NFP~|~All work included in the split.~|~~|~C1946DCE851A17058508B5690F64EC2E7341B921 108374~|~1~|~1~|~01/MPO~|~Resurfacing Norton Ave in the City of Barberton.~|~~|~3929A5E642529AC7D6391B6C0E0ECD3AED88FD98 83135~|~1~|~1~|~01/SAF~|~Raised pavement marker (RPM) contract for FY 2013. Various routes and sections in D-10. 100% state funded.~|~44 - Other~|~4351D74BE17447FE04EB4D61F50092CB92C8A798 90881~|~1~|~1~|~01/NFA/AF~|~Building a parking lot and driveway to the ferry boat. 80/20 w/Augusta Ferry providing the 20% match.~|~26 - Ferry Boats~|~9DF642C06E25917006D9999EC0FC32B6A6C290E5 88339~|~1~|~1~|~01/STR~|~Erosion correction 3/4 miles North of SR305~|~44 - Other~|~57D57600E665F9A81E3365860A10BCC82FB52A79 87206~|~1~|~1~|~01/STR~|~0100633 ADA SR41 0.96 Intersect: Buttermilk Run01/STR/BR/State~|~10 - Bridge Replacement~|~95297F081C03C7B6D04307618733A52033BD4204 100680~|~1~|~2~|~02/S<2~|~General Rehab on JEF-646 from SLM 7.36 to 8.46~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~07D2EB2EE4F8CEC757B567384ECFB9716E0AD041 100680~|~1~|~1~|~01/NFA~|~Resurfacing JEF-646 from SLM 4.31 to 7.36, including asphalt overlay, pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~702B9B27EAE0D9781E72B9CBB9306AF383EA518D 96986~|~1~|~1~|~01/BRO~|~Plan split for bridge repair work.~|~13 - Bridge Rehabilitation~|~730CF9E255176106761A9DCBC047EAEE2C9048DD 124110~|~1~|~1~|~01/NFA~|~Created Plan Split for J&C Involvement~|~44 - Other~|~A6B67D52DE070E7ADBF7B1A13F6E8B9C49C83BA5 105489~|~1~|~1~|~01/STR~|~UNI 47 from 6.95 to 9.14~|~05 - 4R Maintenance - Resurfacing~|~BB12553B8234CF239771AF5DACAF8C956B4D0349 118640~|~1~|~1~|~01/STR~|~MEG 681 6.24 Landslide Repair Using Dump Rock~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A70C3CAF5285B9E88A72694E5DF64B0519F979EE 95195~|~1~|~1~|~01/BRF~|~"01/BRF/BR/ODNR" - ODNR 4BF7 (100% State) - No CAP - Bridge Rehabilition 3026175~|~13 - Bridge Rehabilitation~|~CFB468950A6259DAFC0D30480E2F7F14DC34B0EB 122125~|~1~|~1~|~01/SAF~|~Brown Road corridor improvement from Frank Road north to the Stimmel Rd/Linnet Ave intersection including a mini roundabout at the Brown Rd/Hopkins Ave intersection.~|~21 - Safety~|~29B50C8F87780FF5AAC69354F989586B88F138E8 107598~|~1~|~1~|~01/MPO~|~Federal funds for project.~|~28 - Facilities for Pedestrians & Bicycles~|~CF18B8B08F52FE6FC1C5BE168E96D54EF7B1FE91 96705~|~1~|~1~|~01/NFP~|~Pavement rehab within John Bryan State Park including 1.5 inch mill and fill, full depth pavement repair (in select areas), aggregate for berm improvements, and installation of pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~FFE0698DE8EBB6D30816C895952AE157AC6B99F7 125047~|~1~|~1~|~01/S50~|~Slide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4B95471AB1E4C0DC86AF7F969956511D5C79A6C5 111163~|~1~|~1~|~01/NFP~|~Campground resurfacing~|~28 - Facilities for Pedestrians & Bicycles~|~A3E4A4ED061762062725C438B518DDE73E2365BB 114030~|~1~|~1~|~01/NFA~|~Plan split for CEAO funding eligible construction and CE costs.~|~10 - Bridge Replacement~|~8CB61DF1DCD5E2C8310AAA1D04CA4FDCCB9A6C0B 125717~|~1~|~1~|~01/IMS~|~Various Bridges throughout district 6~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0B2C0C39EC53653EF351F301DB8853FB902CA35E 103281~|~1~|~1~|~01/NFA~|~The proposed project would improve SR 310 in Licking County to accommodate increased traffic from the newly constructed Amazon fulfillment center. The project limits are from the 1-70 interchange on the south to USR 40 at the northerly terminus and includes mainline widening, modification to the USR 40/SR 310 traffic signal and the addition of a new signal at SR 310 and Pike street intersection.~|~03 - Reconstruction - Added Capacity~|~2B6D43E448A882FD8CB6AB5A14D354EBDB863848 104643~|~1~|~1~|~01/MPO~|~Resurfacing Trumbull Ave from US 422 to Girard East Corp Limit, in the City of Girard.~|~05 - 4R Maintenance - Resurfacing~|~0A675C83EF3EBACA62B0E0739195AF5E7FF9A8A4 99732~|~1~|~1~|~01/NFA~|~City is reconstructing Front Ave, West 11th Street and Old River Road.~|~03 - Reconstruction - Added Capacity~|~C5F61FE31FAB5EDE3C7730D6B33C1C53FA8985C1 91727~|~1~|~1~|~01/IMS~|~Split includes the rehabiltation of bridges, WAR-71-1736/8302340, WAR-71-1683/8302316, WAR-71-2179/8302529, WAR-71-1996/8302464~|~13 - Bridge Rehabilitation~|~A33A00F44473DA707EC3D45C83C6D5560BE4B5A0 106988~|~1~|~1~|~01/S<2~|~GSMP rock fall repair.~|~~|~3F3C814748828CAE6EE08A365793E04565E03BC0 87642~|~1~|~1~|~01/BRO/NEWA~|~Replacement of deficient bridge (SFN 4560108) on Cherry Valley Road Lic-CR 128-00.97 - BR Eligible - Length=140, SD/FO=1, SR=32.0, DSR=6. New bridge to be placed on new alignment.~|~10 - Bridge Replacement~|~1C3DB511837745E7C9F06A5A8C36AA40A0901941 87642~|~1~|~2~|~02/S<2/NEWA~|~Construction of new roadway alignments for Thornwood Crossing and realignment of existing roadways.~|~01 - New Construction~|~FDBAE77D12DEEB8D795C0AED845EA7DA9989D405 117122~|~1~|~2~|~02/MPO~|~Plan split for STBG-funded reconstruction~|~04 - Reconstruction - No Added Capacity~|~903F44B0AF9220B63298877D6EA4717204A16CDD 117122~|~1~|~1~|~01/MPO~|~Primary plan split for STBG-funded resurfacing~|~05 - 4R Maintenance - Resurfacing~|~D3A0B78ED7D5340D947EA7F06E069A0D56FD25A7 107124~|~1~|~1~|~01/NHS~|~Work funded with the GSM program. Amounts needed over the GSM cap to be provided from the District Preservation Program budget.~|~44 - Other~|~2555364266FE2C2C4E5E4DD0F1D37812408894DF 114260~|~1~|~1~|~01/BRF~|~Bridge replacement and realignment 80% Federal 4B87 and 20% Local LNTP.~|~10 - Bridge Replacement~|~31FF57E6B66D83EA13A0852F926D573107B28D8D 114260~|~1~|~2~|~02/SAF~|~Roadway realignment 80% Federal 4HB7 and 20% Local LNTP.~|~21 - Safety~|~C67B7837286FD86F00A34E305972210EBF11169C 114260~|~1~|~3~|~03/ENH~|~For pedestrian related elements of the bridge replacement and realignment of CR 62 (80% Federal TAP and 20% Federal Safety). ~|~28 - Facilities for Pedestrians & Bicycles~|~5C450DA06F6F01CA7A0AFF2EB038ADEA57A4F611 98472~|~1~|~3~|~03/SAF~|~Centerline Rumble Stripes on SR57 from 10.28 (Barrington Dr) to 11.61 (Edgewood Ct.).~|~21 - Safety~|~1E88EE55EE7F20D07B2B51FD2C0E6CEA071FCB5E 98472~|~1~|~2~|~02/S<2~|~Bridge Maintenance for Structures LOR-57-11.75Conc patch(non-deck) (010)Exp jt repair/repl (048)Deck patching(conc) (049)~|~13 - Bridge Rehabilitation~|~CAC197E2F450ECCE1B8D8CF880CA978B996C2562 98472~|~1~|~1~|~01/S<2~|~Roadway work for urbanized area sectionLOR-57-4.96 to 7.99 (60-AC Overlay w/Rpr)LOR-57-10.18 to 12.93 (60-AC Overlay w/Rpr)Grafton Rd EB & WB accel ramp at US20 concrete work~|~05 - 4R Maintenance - Resurfacing~|~F86EC2C89BD261C5189C9EE08591572F61314B84 120957~|~1~|~1~|~01/STR~|~Culvert rehab.~|~04 - Reconstruction - No Added Capacity~|~399C179168E01D8EFFB096E03791B7EEAB44638E 120162~|~1~|~1~|~01/NHS~|~Culvert liner project. WAS 7 12.48, CFN 1880522.~|~04 - Reconstruction - No Added Capacity~|~CF47C74C8CA25D786D14A49D1EA0DF9C81DFD655 117284~|~1~|~1~|~01/NFP~|~Application of markings along IR 70 in FAI and LIC counties.~|~21 - Safety~|~1ED40E7C26BAF195279C13D210E3BCE6C87D218D 95104~|~1~|~1~|~01/S>2~|~Resurfacing of Palmyra Road, including guardrail, signing, and pavement markings, in the Village of Lordstown, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~8504DC261D60CF9B9F1364B9DCCBD1650479EC9D 113605~|~1~|~1~|~01/NFA~|~Rehabilitate structure CLE-232-0180 which carries SR 232 over a tributary of Colcaster Run by sliplining the conduit and replacing the inlet headwall.~|~04 - Reconstruction - No Added Capacity~|~4D466586E7151C0932726C3B620803B73ECDF450 98484~|~1~|~1~|~01/STR~|~District Preservation Program funds. Federal funds are rural STP.~|~05 - 4R Maintenance - Resurfacing~|~0FB032014BBEC163143D4E5F58DEB8B8B65D6ED4 98067~|~1~|~1~|~01/IMS~|~100% State Cable Barrier Repairs~|~44 - Other~|~0DC1BE39FC41F450A36096164DC7C3BC100BD7A5 105681~|~1~|~1~|~01/STR~|~STP Rural. District Preservation Program.~|~05 - 4R Maintenance - Resurfacing~|~5EA00873CF3342E9B354D1A9DBC7C06D8CE1124B 107581~|~1~|~1~|~01/IMS~|~To upgrade the existing guide, regulatory, and warning signs along mainline and lead-in signing at the interchanges for IR 70 and IR 470.~|~21 - Safety~|~D19E6364F7CBFC3BCF067914FF8F8CA05BBC4F39 107581~|~1~|~2~|~02/NHS~|~To upgrade the existing guide, regulatory, and warning signs along mainline and lead-in signing at the interchanges for TUS US 36 and BEL SR 7.~|~21 - Safety~|~D134A64063DF09F8DE543B197E04C199B1C00405 105295~|~1~|~1~|~01/NHS~|~Resurfacing JEF-7~|~05 - 4R Maintenance - Resurfacing~|~1B9236CDC31C57F36D4CDC3D72F184DB568E3E3F 97956~|~1~|~1~|~01/S<2~|~Smooth seal SR 41 in Clark County SLM 12.05 to 14.86~|~05 - 4R Maintenance - Resurfacing~|~47A71390E44C48270C0C6FC32ACEAF08C4AAAACA 97956~|~1~|~2~|~02/NHS~|~Smooth seal US 68 in Clark County SLM 5.76 to 12.39, 12.39 to 15.05.~|~05 - 4R Maintenance - Resurfacing~|~489C90A05277E71D3233A6C3030611628727594B 87756~|~1~|~1~|~01/S>2~|~Replace Bridge SFN 7707177 SUM 91 0905 over Branch of Cuyahoga River~|~10 - Bridge Replacement~|~37E87E417FADAF06E1105D96576C74E4372F735F 101757~|~1~|~1~|~01/IMS~|~REplace existing deck with new reinforced concrete deck on bridge BEL-70-2684 (SFN 0703095).~|~10 - Bridge Replacement~|~A4F959905DFC1526087EAAB6FDBC66E9B451F36D 80137~|~1~|~1~|~01/NHS~|~Replace bridge superstructure (deck & beams) for Bridge COL-267-0530, SFN 1504894, and improve vertical clearance by raising bridge. Repair substructure units. The bridge carries SR 267 over US 30.~|~13 - Bridge Rehabilitation~|~41DACB3FEBF57566C01117E840DA65C82F75A92C 107109~|~1~|~1~|~01/IMS~|~Major rehab of MAD-70-8.62 to 15.57~|~04 - Reconstruction - No Added Capacity~|~C0B128D1E57369A126DC5B004375F3A41AF0A140 107109~|~1~|~2~|~02/IMS~|~Concrete deck overlay on structures over Big Darby Creek~|~04 - Reconstruction - No Added Capacity~|~DF2501E8CAF7AE3B722F9D02AE03EAD673ADCECB 107109~|~1~|~3~|~03/SAF~|~Install three ITS cameras~|~21 - Safety~|~68EFCCD625444D0FFD9621481B7321E70156AF70 107109~|~1~|~4~|~04/IMS~|~Repair damage caused by vehicle crashes~|~04 - Reconstruction - No Added Capacity~|~CEB4912794EAD47038C8577B99E696DCC18A40BE 101432~|~1~|~1~|~01/NHS~|~NHS AC Overlay without Repairs~|~05 - 4R Maintenance - Resurfacing~|~41697CBB49C5936FDEAB9203F4D447E666B372E0 81708~|~1~|~1~|~01/IMS~|~Replace reinforced concrete deck with new deck on two bridges, BEL-70-2134 & BEL-70-2134N (SFN 0702870, 0702889). May need some minor repair to substructure and painting of steel.~|~13 - Bridge Rehabilitation~|~9ED54C0AAEAEF937899B62FDB1C36DB6734000D5 87035~|~1~|~1~|~01/SAF~|~Project for systematic sign upgrades in villages and other missed areas that need upgrading in Preble County.~|~21 - Safety~|~D5799A14A61F00838A0AC7F27732B085DAABFF1F 87035~|~1~|~2~|~02/IMS~|~Minor rehab to include painting of structural steel and repair/replace damaged railing.~|~13 - Bridge Rehabilitation~|~136FDA8A984AF29FEBE00151E1E6DEE5960E734F 91093~|~1~|~1~|~01/IMS~|~District Allocation - 90/10~|~05 - 4R Maintenance - Resurfacing~|~E51495263C319A80DDB6234429CB089B60387194 91093~|~1~|~2~|~02/SAF~|~Wet Reflective and Grooving Long Line Pavement Markings (Items 807 and 850).~|~21 - Safety~|~10A42ECA26844DF2DF45A7B04570EE3850FE4892 91093~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~21 - Safety~|~E0F9CFB26BDF135D78B3F89B6391E7752022B972 114101~|~1~|~1~|~01/NFP~|~All work in this project.~|~04 - Reconstruction - No Added Capacity~|~70DD557FE094E686D5EC2A25B1C411D8C9969509 91148~|~1~|~1~|~01/IMS~|~Minor pavement rehab, FRA-270: 0.60-2.60~|~05 - 4R Maintenance - Resurfacing~|~81E7CB41332B4A07B24DDEA6B9411308E6DBC9A9 94254~|~1~|~1~|~01/IMS~|~Resurfacing and pavement repair on a portion of I-675 in Greene County from the Montgomery Co. line to almost North Fairfield Road. GRE IR 675: SLM 0 to 9.48~|~05 - 4R Maintenance - Resurfacing~|~3606A74F2C83252134EBD8CB567053DCD1A9EA19 94254~|~2~|~3~|~03/NHS~|~Replace catch basins along ramp on US 35~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3F4204DAF7600E64F90D9235F6062DB132E2F942 94254~|~1~|~2~|~02/IMS~|~Plan split includes all bridge maintenance work.~|~13 - Bridge Rehabilitation~|~E3FCB3176CCACC4C18502E3BDAAB9BD854DC1DA5 94254~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~7D33D838653BA993953EEBAAA84675294FCA73F5 109392~|~1~|~1~|~01/ENH~|~Bike Lane funding~|~28 - Facilities for Pedestrians & Bicycles~|~1E4D7BE86A33EC3DDE194AEAA6684A49CA5366C7 109392~|~1~|~2~|~02/NFP~|~100% County Items~|~~|~1FE3559CF1E9495C8D71BB3E1462A5C31CC8D414 97495~|~1~|~1~|~01/BRO~|~Repair concrete elliptical pipe structure COL-45-2298 (SFN: 1502824) located at S.L.M. 23.72 by installing a spray applied structural liner.~|~04 - Reconstruction - No Added Capacity~|~965190ABBB3BE45B0479FCDFA8CBC7346068AF01 120803~|~1~|~1~|~01/SAE~|~Single land roundabout on SR-48 at Lytle Five Points Rd~|~21 - Safety~|~17D0B22C66694451D4F3974FCE801F10E694499E 105383~|~1~|~3~|~03/NFA~|~Smooth seal on Non-Federal Aid Route: AUG SR 720 SLM 0.00 to 2.81~|~05 - 4R Maintenance - Resurfacing~|~8CC433EB217E0568DF935F45330C30877D5A0383 108482~|~1~|~1~|~01/SAF~|~Plan split for TSMO pavement work~|~21 - Safety~|~F1278C27FF69D31EE3C7A560127A5B3CDD586059 108482~|~1~|~2~|~02/SAF~|~Plan split for TSMO bridge work~|~21 - Safety~|~633B3736105EB8B18E7288FC5CCBCD2F31785102 115420~|~1~|~1~|~01/IMS~|~Culvert replacement project. WAS 77 9.58, CFN 1810412. ~|~04 - Reconstruction - No Added Capacity~|~3CC8D959663D63E1EA9134C43795704D131649F2 115933~|~1~|~1~|~01/BRO~|~Replace culvert type bridge carrying SR 151 over George's Run. ~|~10 - Bridge Replacement~|~95C15F4B8AC270A223E3E6D97C63451060F757AE 22131~|~1~|~2~|~02/NHS~|~Split for painting the Lorain Rd bridge~|~13 - Bridge Rehabilitation~|~BC0F7935C4F0CFEEAA4A0CA90F0FCEB56D9DC82E 22131~|~1~|~1~|~01/IMS~|~Funding split for all work on the interstate.~|~13 - Bridge Rehabilitation~|~F5209299A3831BAE89C080687BA7BEF5231F60A4 111121~|~1~|~1~|~01/MPO~|~Reconstruction of Lewis Ave. from Laskey to Shantee Creek~|~04 - Reconstruction - No Added Capacity~|~51EE8C3D7F99148BA788D1120956039791101DC7 111121~|~1~|~2~|~02/MPO~|~Resurfacing of Lewis from Shantee Creek to Alexis Rd.~|~05 - 4R Maintenance - Resurfacing~|~4ED1F10603EBCBBA7C0A825F7060C0325F7C00FB 121022~|~1~|~1~|~01/NHS~|~Plan split to program project, updated when scope is complete.~|~13 - Bridge Rehabilitation~|~9A8B6F854ABE675F76F03171FE066B6040657460 102492~|~1~|~1~|~01/NFP~|~District Maintenance and Preservation Funding - 4CP7 / 4PS7 (100% State) - See CAP Comments - Plan Split for Guardrail upgrade on various district routes~|~21 - Safety~|~A0EC16E9365433EF9C00AC0F6A53F88318B7AA32 100824~|~1~|~1~|~01/S>2~|~Convert the existing five lane arterial section of US-62 between State Route 43 and the Nimishillen Creek/Railroad underpass which includes numerous at-grade intersections and driveways to a four lane divided limited access section approximately one mile in length, while the existing US-62 Eastbound lanes would be utilized as a frontage road for the properties on the South side of the freeway. In Plain Township, Stark County, Ohio.~|~04 - Reconstruction - No Added Capacity~|~B93B6C3581A6BA674B29B5A7D1C718D2E6BDBD37 100824~|~1~|~2~|~02/S>2/CANT~|~Construction of waterline along US-62 frontage road. Funded 100% Local.~|~43 - Utilities~|~A78AC6EC6020FD09CC23975611D942D677923525 100824~|~1~|~3~|~03/S>2~|~New culverts along new US 62 alignment.~|~04 - Reconstruction - No Added Capacity~|~B85CCB7F2CED3ABF10B7A37B3FD690E0FAAA1674 100824~|~1~|~4~|~04/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~751892E18B35A62D9CC85805AF99CF1D74D94666 122054~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~~|~4C21B4DF1535371AA8CE759DC98B0193E55C441E 113551~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads.~|~21 - Safety~|~35CE41F809489F4FA16526142EDE14D4733BCFF0 107366~|~1~|~1~|~01/NFP~|~Construct material storage.~|~~|~30656CFC257F314A20D151FA3A66876A9CCE16F1 94391~|~1~|~1~|~01/STR~|~STP Rural Resurfacing: ASD 604 0.00-3.38..~|~05 - 4R Maintenance - Resurfacing~|~1107C53F486CC288B0C6228DF1525D4152E8F8C0 84884~|~1~|~1~|~01/BRF/LCEO~|~"01/BRF/BR/LCEO" - County Engineer's Association Funding 4B87(80% Federal) / LNTP (15% Federal Credit Bridge) / LNTP(5% Local) - CAP=Total of $2.5 Million minus $140,000.00 for ROW = $2,360,000.00 for Construction ? Replacement of SFN 453685 LIC CR 39 02.20 York Road Intersect: South Fork of the Licking River BR Eligible for Replacement: Length=87? SD/FO(1) SR=18.2 DSR=6~|~10 - Bridge Replacement~|~957D7A8B30FC960CCEF4590B7CF7AF5192E144B1 107511~|~1~|~1~|~01/STR~|~Resurfacing HOL-514~|~05 - 4R Maintenance - Resurfacing~|~2DF7CF13F5943D2FA798250550A8DDEB86E24BC7 90692~|~1~|~1~|~01/MPO~|~construct bioswale and infratstructure to improve pedestrian and drainage system on Reynolds Rd~|~31 - Landscaping & Other Scenic Beautification~|~379BDF497C53C511DCC5F7741A1670B261FA3817 24839~|~1~|~1~|~01/STR~|~District Allocation~|~~|~6F3D8880B4590D0C900D3098B41C7B1F36754C33 101322~|~1~|~1~|~01/STR~|~Chip seal MAD-323-0.28-18.66 and UNI-739-11.73-14.13~|~05 - 4R Maintenance - Resurfacing~|~32E55F4E2777DB7590453ADCA6B205BF72D8D94B 89947~|~1~|~1~|~01/STR~|~Resurfacing / Mill and Fill~|~44 - Other~|~6AF5930D68AC8797CCF7034BFFFA07796DE56206 109266~|~1~|~1~|~01/NFP~|~Districtwide fence repairs and replacement.~|~44 - Other~|~FE53A221AB83D77359EBC5393094F245B32A0146 81239~|~1~|~1~|~01/NFP~|~"01/NVP/PV/ " - District Preservation - 4MP7 (100% State) - Contract for placement every three years of Thermoplastic Striping within District 5 on IR; US; and SR~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7CA90D17C980EF60EA617E5BA2A9EDA9891D7A40 120248~|~1~|~1~|~01/SAF~|~SRTS Funding for crossing improvements in Norwalk~|~21 - Safety~|~3C51378E950C1B41BBED01FF1BE7EA275D67C33B 105094~|~1~|~1~|~01/STR~|~01/STR/PV/ -Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~759B8EA62D341B3707A60961F63C2D7EF89CFC5D 97954~|~1~|~1~|~01/STR~|~SR 245 SLM 10.81 to 20.02 (OC 000) - resurface the existing roadway with asphalt concrete (2.00 in).~|~05 - 4R Maintenance - Resurfacing~|~6652C91EB25BE88E5313ABCA3BC3D3F22EB7F697 100641~|~1~|~2~|~02/NFA~|~Resurfacing SR 179 from SR 3 to ASD Co. Line~|~05 - 4R Maintenance - Resurfacing~|~0E918D9DBCD94BC038C4DCAEAF83A5C57EA4B939 100641~|~1~|~3~|~03/STR~|~Asphalt resurfacing of WAY-226~|~05 - 4R Maintenance - Resurfacing~|~6772DC39DF2051FB4C85DB3891B4528889363F17 100641~|~1~|~1~|~01/STR~|~Resurfacing SR 83, SR 179 from SR 226 to SR 3 and SR 226 from SR 179 to SR 514~|~05 - 4R Maintenance - Resurfacing~|~7A5BD41B00097461A1D27EFC6737F29AE4594FEC 125223~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract for various routes~|~21 - Safety~|~37A29FA79AD9A3584B50EF7F2F75B51A6B6C5C67 105326~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on rural route: MIA SR 55 SLM 16.30 to 21.34 CHP SR 55 0.00 to 0.23.~|~05 - 4R Maintenance - Resurfacing~|~39A2BD09B8C40D7112D2B2420BE0F2BC7A3F2D26 98128~|~1~|~1~|~01/NHS~|~Landslide Remediation on U.S. 22.~|~04 - Reconstruction - No Added Capacity~|~261C36A93CB0589931F5652D0A30BE9584F527FA 107163~|~1~|~1~|~01/NHS~|~Bridge due to accident.~|~13 - Bridge Rehabilitation~|~8A82D9E29C4A193227A5EA77A4880847E5E1B9FA 119825~|~1~|~1~|~01/S>2~|~Resurfacing work on Zollinger Road~|~28 - Facilities for Pedestrians & Bicycles~|~5509EE521AF8A688142BEC27771B6009197B7D9B 88796~|~1~|~1~|~01/STR~|~Replace deteriorating bridge with minimal approach work on SFN 1201417 CLA US 40 26.03 Beaver Creek.~|~10 - Bridge Replacement~|~377158DF54F5CAFEA6742427C6A5B73B8D5E726D 91164~|~1~|~1~|~01/MPO~|~LAW SR7 3.04 OH11-02On SR7, begin project 2.3 miles north of its intersection with SR527. . MPO area80/20 split 01/MPO/OT/State~|~44 - Other~|~F8EF62ADC011519D1CD8CFB7D6BCFEB1801BCDD0 126302~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~8ADE0BB7FF82C36C09B5088BCF221D6B56DC2C8A 103798~|~1~|~1~|~01/SAF~|~Safety Plan Split~|~21 - Safety~|~ADF24A9F5721A5598A98E8DFCE1AE4A16B9FB5D7 109937~|~2~|~2~|~02/NFP/GRAN~|~100% Local Plan split for Federally Ineligible items~|~21 - Safety~|~09D9F307AC873DD7A2B2ACEAF4D51B9F5FA94A0C 109937~|~1~|~1~|~01/SAF/GRAN~|~"01/SAF/OT/GRAN" - TAP 80% Carbon Reduction (4CT7)/20% Safety (4HJ7) and LCATS 80% Federal (4TB7)/20% Local (4BG7) - funded improvement of three traffic signals and mid-block crossing within village of Granville.~|~21 - Safety~|~AB4CFF823EB0F6426F80A0914B3FB1852807800A 106231~|~1~|~1~|~01/STR~|~Landslide repair by drilled shaft retaining wall. DSR TUS-001~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C7B968A606F8F402B92109C86E5D9E75B004125E 119144~|~1~|~1~|~01/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 19.11-28.74.~|~03 - Reconstruction - Added Capacity~|~1DA6F42EDC815D884567D7A9A5B3CEEBE7BFFC59 119144~|~1~|~2~|~02/NHS~|~Converting Super 2 Lane sections to a four lane divided highway on MEG 33 19.11-28.74. New Pavement. ~|~04 - Reconstruction - No Added Capacity~|~FB4D014C7B4596E20D24694747E7CC6756FAEF7C 119144~|~1~|~3~|~03/NHS~|~Construction of 3 new structures as companion bridges on MEG US 33 19.11-28.74.~|~08 - Bridge - New Construction~|~CEDE1DFEDF44B0B969C69247476940369835DB1D 114628~|~1~|~1~|~01/STR~|~Overlay on ROS 772.~|~05 - 4R Maintenance - Resurfacing~|~23AA5A9CDC3A1C4C357F28727E7C1CF6D963B6A1 114628~|~1~|~2~|~02/NFA~|~Overlay project. ~|~05 - 4R Maintenance - Resurfacing~|~3AA3C09E580DE971FDDDA85782F02CE7AD798F51 114628~|~1~|~3~|~03/S5K~|~Added plan split.~|~05 - 4R Maintenance - Resurfacing~|~B4FD00E21F99D1B4A1208F08F2EC8A980CB7BE52 114628~|~1~|~4~|~04/NHS~|~added NHS bridge plan split.~|~47 - Bridge Preventive Maintenance~|~8326D3DA7C18978777D6F9C0FE033F7539FA3875 114628~|~1~|~5~|~05/S5K~|~added STP plan split.~|~47 - Bridge Preventive Maintenance~|~6306A19C3B51467545FD4B35C902525171D254E6 121915~|~1~|~1~|~01/SAF/CANT~|~Pedestrian enhancements.~|~28 - Facilities for Pedestrians & Bicycles~|~704EF21272EF0674C1A801C72C20CFCFF99C402C 109604~|~1~|~1~|~01/NFA~|~Landslide repair. MRG 376 14.92. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7C2EB8BFB90E7968680A4124F54A5E40A6283F51 109983~|~1~|~1~|~01/NFP~|~D09 GR End Assembly Repair~|~21 - Safety~|~FDCBC9026AF416CF508D0A9BF00BB94F7613CBF3 101316~|~1~|~1~|~01/NHS~|~Microsurfacing and double microsurfacing on NHS routes:FRA-317-0.00 to 5.45MAR-95-17.19 to 18.31MAR-23-2.41 to 10.62~|~05 - 4R Maintenance - Resurfacing~|~2517B09BCF0C74422ADD03CDBCAB5812CD6760A5 101316~|~1~|~2~|~02/STR~|~Microsurfacing on Rural STP route:DEL-605-0.00 to 6.21~|~05 - 4R Maintenance - Resurfacing~|~042FC262E1B5CE458B426E902DFB6407D169A57B 103014~|~1~|~1~|~01/NHS~|~See linked structures.~|~13 - Bridge Rehabilitation~|~6372AF91ABDE7F0CC8F42F1188DC48F17D5EEF1C 106390~|~1~|~1~|~01/NHS~|~Widening of Morse Rd~|~21 - Safety~|~FC7E056A819A78D5D91A533C5931B7134D730216 106390~|~1~|~2~|~02/IMS~|~SB 270 Exit Ramp~|~21 - Safety~|~3531FDD3DB7C40EDD519D7F4DB42AB28D8146D6F 106390~|~1~|~3~|~03/NHS~|~L-Brands/Morse Rd. 100% Local improvements~|~21 - Safety~|~B38002EC76250B4DECCFC3E0C669CE40797367B3 125077~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 93 over railroad.~|~10 - Bridge Replacement~|~2B35B30CBCF045E70DF969B7D4C8AB6122667400 108013~|~1~|~1~|~01/NHS~|~Lighting~|~44 - Other~|~8CB66BAE38D1A53A3A2AABF64501CFCD05EC21F2 97275~|~1~|~1~|~01/STR~|~District wide herbicidal spray project~|~44 - Other~|~E9812F745B60F478D88F164780A9D4A95A0CC1E2 94804~|~1~|~1~|~01/S<2~|~Pulverize existing road and remove excess crown and make ADA improvements. SLM 0.00 to 0.80~|~05 - 4R Maintenance - Resurfacing~|~B5F453A0CD8057856539CA690002BC2929455811 99592~|~1~|~1~|~01/NFA~|~Rehabilitate the Urbana Line From M.P. 124 to M.P. 119 and replace approximately 1,0000 cross ties per mile. Rail improvements would be included where needed.~|~44 - Other~|~2F6BDC4D18525C298D9E2D494B4373D33B4B2D40 99592~|~1~|~2~|~02/NFP~|~Rehabilitate the Urbana Line from MP 124 to MP 119 and replace approximately 1,000 cross ties per mile. Rail improvements would be included where needed.~|~44 - Other~|~6DE56CFA5704CD305B3290B9CCEBA4F87F2B76D4 105350~|~1~|~1~|~01/BRO~|~Western Hills Viaduct (WHV) Phase 9: Demolition of the existing WHV.~|~10 - Bridge Replacement~|~4E104E731A9274E980B1FC0E63F3E541CB35B1B5 106299~|~1~|~1~|~01/NFP~|~Pavement marking Work Order on various routes throughout District 4.~|~21 - Safety~|~033134BF0C921D5B067DBBDA6F694F40BDF57CC4 107960~|~1~|~1~|~01/IMS~|~plan split for longitudinal joint repairs on BUT-75~|~05 - 4R Maintenance - Resurfacing~|~94A61E679C152AD1E5EC5DC4A76268C67D9AECD6 110332~|~1~|~1~|~01/MPO~|~Reconstruction including reconfiguration of existing concrete medians,installation of a 5' sidewalk on the north side and a 1 O' shared use path on the south side of the roadway, and replacement of the existing corrugated, metal arch culverts at the western project limits and the intersection of Riverside Drive and Shoup Mill Road.~|~04 - Reconstruction - No Added Capacity~|~130117DDFC5CC9B27C1121B177A103ACBF1FD985 109400~|~1~|~1~|~01/SAF~|~District wide fast drying pavement markers.~|~21 - Safety~|~CBFA7CC3A6DD96DD461A2086A34A7407508E5B00 96216~|~1~|~1~|~01/NFP~|~Environmental remediation of Portage County garage in Rootstown, Ohio.~|~~|~92832DB8488D87C77444B44A6794E2137C952821 93552~|~1~|~1~|~01/SAE~|~SRTS project~|~28 - Facilities for Pedestrians & Bicycles~|~FF02425CF0AF1474CA1EE2FD37C5E3AABC5851C6 100923~|~1~|~1~|~01/S<2~|~This plan split is for the small urban routes.~|~05 - 4R Maintenance - Resurfacing~|~DEB5F530536E3498BF73994FCEB0CE176BB9AA1F 100923~|~1~|~2~|~02/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~4269763BFC340C406397F6F5587C821C302CC1B0 100923~|~1~|~3~|~03/S>2~|~This plan split is for the large urban route.~|~05 - 4R Maintenance - Resurfacing~|~C92005FB6B1E2FACB6D877912EA05FA0B31AC039 103668~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 18.29. DSR MEG-002.~|~~|~DF0F08AE506D804D88DC7B6B213E96157BE30364 84530~|~1~|~1~|~01/NHS~|~Bridge Work on NHS Routes for the following bridges: CLE-125-1347, CLE-32-1425L, CLE-32-1425R, CLE-32-1214, CLE-32-1314L, GRE-35-2297, and HAM-562-0227. This plan split also includes incidnetal roadway work relative to these bridge locations.~|~13 - Bridge Rehabilitation~|~67D5AE035682E985827F46925F6DEC66E69E9216 84530~|~1~|~3~|~03/NFP~|~Split includes work related to Bridge CLE-743-0466.~|~13 - Bridge Rehabilitation~|~A0789DB2FD851486BAA9B5E6EE71B4973D4FBB17 84530~|~1~|~2~|~02/S>2~|~Includes work related to bridge CLE-132-1425 and WAR-123-1740.~|~13 - Bridge Rehabilitation~|~C90634039DF233D63632B7B051A9A9A5656504AF 84530~|~1~|~4~|~04/STR~|~Plan split includes work assoiacted with bridges PRE-127-1716, PRE-177-0486, and WAR-123-0598.~|~13 - Bridge Rehabilitation~|~F64C5D36E2EC83E44D72147CD8B024E71585F403 106961~|~1~|~1~|~01/NFA~|~Construct Sunbury Parkway from US 36 to 3 B's & K Rd and widen Sunbury Parkway between 3 B's &K Rd to W of IR 71~|~01 - New Construction~|~279B8BBBA4110C101EB5697CA12C7782B8F37434 102844~|~1~|~1~|~01/NFA~|~D09 Guardrail FY22~|~21 - Safety~|~36CF08E0B1552CF51606D4829FA1C56E72CE1884 110937~|~1~|~1~|~01/STR~|~Culvert Replacement by Jack & Bore or Open Cut.~|~04 - Reconstruction - No Added Capacity~|~82A0AAF4798C96C263F5C729448917212041536E 123612~|~1~|~1~|~01/STR~|~Plan split for STP Rural~|~05 - 4R Maintenance - Resurfacing~|~C9E472B5DA59DD9EFB6B170F8FA41A2A151D3E0C 105143~|~1~|~1~|~01/IMS~|~"01/IMS/BR " - District Preservation - No CAP - 90% Federal (4PF7)/10% State (4PS7). Work to include deck overlay and concrete patching.~|~13 - Bridge Rehabilitation~|~54B82973B6EC676251A07B84A5B39C6077CC67D8 111483~|~1~|~1~|~01/NFP~|~Resurfacing of E Newport Dr and Valley Drive in Mill Creek Park.~|~05 - 4R Maintenance - Resurfacing~|~85E029F1C42FBF843CD00FB268BF54A9C0A39CC4 119981~|~1~|~1~|~01/MPO/BEAV~|~MVRPC carbon reduction funded lighting project in and around the city of Beavercreek.~|~21 - Safety~|~44AF85F7F0B65D84D9E5E331DD5DFDFC5E887751 95932~|~1~|~1~|~01/NFA~|~Mill and repave several sections of the Great Miami River Recreation Trail that are currently in poor condition~|~28 - Facilities for Pedestrians & Bicycles~|~59AC364730CAE9DE3844150DFD4BAAF3737643E4 102454~|~1~|~1~|~01/STR~|~Spot Paving on various routes in District 11~|~05 - 4R Maintenance - Resurfacing~|~810DCFE144F3028C1A007AA00BB1DBC20D61B569 101102~|~1~|~1~|~01/STR~|~AC Overlay without repairs on:AUG-119 SLM 5.92 to 7.19SHE-119 SLM 0.00 to 2.19SHE-274 SLM 6.21 to 8.97~|~05 - 4R Maintenance - Resurfacing~|~4E6726AFE10B9A029E5BE9CE7676764D07724219 101102~|~1~|~2~|~02/S<2~|~AC Overlay without repairs on:AUG-119 SLM 5.78 to 5.92~|~05 - 4R Maintenance - Resurfacing~|~7315EB6A0F7A3E2780D615588ACD75E111CBE659 99643~|~1~|~1~|~01/STR~|~Resurfacing work funded at 80% federal and 20% state~|~05 - 4R Maintenance - Resurfacing~|~4AE730A339861B9AE75D708F94C20FB6EEC4DF9F 114160~|~1~|~1~|~01/SAF~|~Raised Pavement Marker (RPM) contract for FY 2027.~|~21 - Safety~|~CCB3BFFB9567545B5F4BFAB2274C614CC55FD7F3 116376~|~1~|~1~|~01/NFA~|~Created for Plan Split J&C involvement~|~44 - Other~|~506701949C19A2693075B067AE5137CC452178D1 106544~|~1~|~1~|~01/BRF~|~ROS CR 222 3.83 (SFN 7146116)~|~10 - Bridge Replacement~|~AE0DAD13B226759920FBC4D6F57C20D7254F973F 106544~|~1~|~2~|~02/SAF~|~Intersection Improvement.~|~21 - Safety~|~E4BDF536611B7E674B2D0539C4B3564BA62C09D6 106544~|~1~|~3~|~03/SAE~|~Change order for archeological work. ~|~21 - Safety~|~6BC1F2445A792A5E772ECC064D00FE7E0B3106B5 21788~|~1~|~1~|~01/IMS~|~Funding split for all work on the CSX structure~|~10 - Bridge Replacement~|~BC393BA350A36CEF0F9AC9572EFE0F36E8644086 93024~|~1~|~1~|~01/NHS~|~"01/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Kno-SR 13-16.00 to 20.74~|~05 - 4R Maintenance - Resurfacing~|~1C91BF62A8F3097DC0CBE59E5B819699DAE08B53 97013~|~1~|~1~|~01/STR~|~from SLM 0.00 to SLM 4.05~|~05 - 4R Maintenance - Resurfacing~|~D430BBFF09AE47E99CE9B1768A169520763D81CE 108888~|~1~|~1~|~01/NHS~|~Urban Paving Program in the City of Oakwood. SR48 SLM 8.66 to 10.87~|~05 - 4R Maintenance - Resurfacing~|~C5F8869237F02CCA94253B9C568A4580F4B9F40E 105799~|~1~|~1~|~01/CMQ~|~CMAQ funded signal system upgrade~|~21 - Safety~|~275646CE90CBB313C87E3A0CA50EC70037891877 105799~|~2~|~2~|~02/S>2~|~100% City of Delaware funded signal upgrade~|~21 - Safety~|~AD10251DF1B9C699C1AFD478A071B6F91473A1B7 104097~|~1~|~1~|~01/BRO~|~Split for funding the bridge replacement~|~10 - Bridge Replacement~|~9DF6D10B9BF9EBC0A5F553A92B56EAC8087EFCC7 124912~|~1~|~1~|~01/STR~|~Culvert erosion repair.~|~04 - Reconstruction - No Added Capacity~|~485E62CBB423B267197F15DD02FEAFBFDE3C0497 113003~|~1~|~1~|~01/S5K~|~Overlay of SR 335. Local Match~|~05 - 4R Maintenance - Resurfacing~|~0C3DE0105E77472FCCC68FF397F065A6944F539E 113003~|~1~|~2~|~02/STR~|~Overlay on SCI 335~|~05 - 4R Maintenance - Resurfacing~|~B826D0A69DFF5F71C178D8EE307A16A3C066F979 114095~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~F38257B2FDE35F2BFBD844950AB555EDCA83F0EF 96133~|~1~|~1~|~01/NFA~|~Construct a new 40' x 120' storage building at the ODOT Auglaize County Full Service Facility.~|~44 - Other~|~F6D0832BC50F0E5D3EEBE53593795A7A3F821D8C 110113~|~1~|~1~|~01/IMS~|~Plan split for work in IMS locations. ~|~47 - Bridge Preventive Maintenance~|~6AC58175A2BADE35F1FDD21AF03F2C214DB4986F 110113~|~1~|~2~|~02/S5K~|~Plan split for work in Sm Urban locations.~|~47 - Bridge Preventive Maintenance~|~B24214E9B78B5B00C44F12899E2E1527F6FD7C97 110113~|~1~|~3~|~03/STR~|~Plan split for work in rural locations. ~|~47 - Bridge Preventive Maintenance~|~750CD3E644FC63EDB09E7BF0C2F295003465F06B 109809~|~1~|~1~|~01/STR~|~Resurfacing on SR 613 using district preservation funds (4PF7 - 80% and 4PS7 - 20%).~|~05 - 4R Maintenance - Resurfacing~|~1BF11ABC317602F1B7F37804E282DB43705E83A4 116095~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in ATB, MAH and TRU counties.~|~05 - 4R Maintenance - Resurfacing~|~E0AD78D387BC9D51B793BE8A5582788386BB0E01 109745~|~1~|~3~|~03/STR~|~Plan Split 03/STR/BR/ - District Bridge Preservation Funding 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP~|~13 - Bridge Rehabilitation~|~CD8F4E1FCC636653752AF218CAC2BC78E5ABEB62 109745~|~1~|~1~|~01/STR~|~01/STR/PV/ : Plan Split 1 for Lic-37-25.08-25.84, Fai-37-0.00-6.81, and Fai-37-6.480-9.693~|~05 - 4R Maintenance - Resurfacing~|~6A361C5CDFE05594454AAB17999C6B39ABB69299 109745~|~1~|~2~|~02/S<2~|~02/S<2/PV/ : Plan Split 2 for Fai-37-9.693 to 12.887~|~05 - 4R Maintenance - Resurfacing~|~E04E39F7AC4D610EEBDEFD9D2DA6E153B11009FC 122407~|~1~|~1~|~01/SAF~|~All items of work associated with the installation of sign trusses on US23.~|~21 - Safety~|~B207EBB4153588933FF9D64D74C420642CB73202 122407~|~1~|~2~|~02/SAF~|~All items of work associated with the installation of sign trusses on IR-70.~|~21 - Safety~|~D9259DF937B81886EEF6FA2C0ACBADE886C62BE0 122407~|~1~|~3~|~03/SAF~|~All items of work associated with the installation of sign truss on the US33 ramp at I-270.~|~21 - Safety~|~9CEFEBEBED9FEE263091FF0F5C5C40878EFA46FF 93594~|~1~|~1~|~01/IMS~|~Pavement from SLM 1.10 to SLM 2.75~|~04 - Reconstruction - No Added Capacity~|~8931D07496F7A7AF334ADE2DAC90B474A70C7C83 93594~|~1~|~2~|~02/IMS~|~Major Bridge over Colligwoo/Swan Creek/AWT~|~10 - Bridge Replacement~|~C40997E0F78CC772FD7CBC5CDC0180791162C0E4 93594~|~2~|~3~|~03/NHS/Tole~|~Reconstruct SR-25 (AWT) from City Park to Collingwood. Funded 100% local. Part 2~|~04 - Reconstruction - No Added Capacity~|~B3AD70D16252035E52AAEB322188B60EBCFD9930 93594~|~1~|~4~|~04/IMS~|~District funded plans split for Emergency Change order.~|~05 - 4R Maintenance - Resurfacing~|~44466BBB9D3047442BF2688721462706FA3551BA 93594~|~1~|~5~|~05/NFP~|~100% City of Toledo funded Items~|~04 - Reconstruction - No Added Capacity~|~B7495783B2A66F329355EC98A33BB6861626CD51 93594~|~1~|~6~|~06/NFA~|~Retroactive fuel price adjustment~|~04 - Reconstruction - No Added Capacity~|~F1A1C0C64252DD8D70C7D4415115EAFDCD6B1436 99556~|~1~|~1~|~01/BRO~|~Change Order for Block PID~|~44 - Other~|~CA9AD60004B791B736AF9578D1FC89B29D46F5F7 102645~|~1~|~1~|~01/NHS~|~Two-lane resurfacing project using a double microsurfacing treatment. ATH 33 4.70-11.07, MEG 33 4.26-9.62 and WAS 7 14.05-17.60. NHS route funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~552B8DD80AB0B110466F7059A8A83CDC93A4BC65 114480~|~1~|~1~|~01/STR~|~Guardrail maintenance, repair and replacement throughout District 11~|~44 - Other~|~7A94DC571B9A979C9D129C3A2C5EEA5F605B035E 103287~|~1~|~1~|~01/NFA~|~The county is constructing road improvements to support ElectroCraft, specifically adding a crosswalk safety improvement consisting the installation of a programmable solar powered beacon system crosswalk lights, enhanced pedestrian crosswalk signage and the restriping of the existing crosswalk on Bob McCormick Road.~|~21 - Safety~|~074D0CBB14B9A085D41479D4013E78D7821F9E50 98581~|~1~|~1~|~01/BRF/MCEO~|~County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-CR5-3.68 - SFN 6032028 - BR Eligible for replacement: L=31'; SD/FO=1; SR=48.0; DSR=5; over Little Salt Creek;~|~10 - Bridge Replacement~|~8E21A04182F64139ABD577D3C5504DE875EA5774 98581~|~2~|~2~|~02/BRF/MCEO~|~County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - MUS-TR136-0.73 - SFN 6034659 - BR Eligible for replacement: L=28'; SD/FO=1; SR=52.0; DSR=7; over Blue Rock Creek Tributary~|~10 - Bridge Replacement~|~6455D50D001AD179137DD78918832450E9BE1B6B 101027~|~1~|~1~|~01/SAF~|~District wide maintenance contract for highway lighting in D8 for FY2022/FY2023.~|~21 - Safety~|~3533B433F7636B3C89F915044F2845DC5F0C9C9E 101027~|~1~|~2~|~02/SAF~|~District wide maintenance contract for highway lighting in D7 for FY2022/FY2023.~|~21 - Safety~|~F6F9839D293924152343DE28198D1E3D1C68F078 101027~|~1~|~3~|~03/SAF~|~MOT 70 sign truss foundation and installation ~|~~|~9FF1F0B8AB4EFC07BC9D9B5AA18335EECC09CFC3 119748~|~1~|~1~|~01/SAF~|~Guardrail improvements on various county maintained routes in PRE county.~|~21 - Safety~|~A68D2598C98423E64560E946D9E116455EE8A931 92329~|~1~|~1~|~01/NHS~|~Bridge painting project with beam end repairs. ATH 33 12.44 L&R (SFN 0500720, 0500755) ATH 33 16.31 L&R (SFN 0500852, 0500860) ATH 33 17.60 L&R (SFN 0500941, 0501018) NHS, Federal 80% and State 20%.~|~13 - Bridge Rehabilitation~|~8F57EA49390DF622D9F25185724F76C3FE1B1558 122160~|~1~|~1~|~01/S5K~|~Repair/stabilization along SR 56~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EF7FB54975B5EB6B61EB5D182269AC98EF19A385 116582~|~1~|~1~|~01/NHS~|~Replace culvert type bridge carrying SR 7 over Narrows Run.~|~04 - Reconstruction - No Added Capacity~|~FD1DA57C68D7510313F2434E7A01AA12D400AEFD 124230~|~1~|~1~|~01/NHS~|~Crack and Seat Work~|~04 - Reconstruction - No Added Capacity~|~7F9C2CB6DCCF52ED2306D93DD9E5B57413A64F2C 98279~|~1~|~1~|~01/NHS/NEWA~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP -Rehabilitation of SFN 4504941~|~13 - Bridge Rehabilitation~|~1D7E614CDE0EA9F8C37DA922D1EB4739602C1F5E 84554~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. WAS 530 0.00-7.86. Non-Federal Aid route, 100% State funded.~|~05 - 4R Maintenance - Resurfacing~|~BAF4D9571843091903ED66988CA5E843417D186F 84554~|~1~|~2~|~02/SAF~|~Upgrade to sidewalks, crosswalks and rapid flashing beacons in the Village of Beverly. Safety funded 90% Federal/10% Local (TRC).~|~21 - Safety~|~103EF9115533F94794528F658FF6E8E6117DA4E8 89291~|~1~|~2~|~02/S>2~|~Repair of an existing landslide located along SR-131 approximately 0.1 miles east of US-50, programmed under ODOT sponsored PID 81197, has been included in this project.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~155E22C627F494647E3DE9E28A1B53825EFA088C 89291~|~1~|~1~|~01/MPO~|~Project involves the widening of SR-131 north of US-50 to extend the storage capacity of the existing right turn lane, provide proper through-lane geometric alignment, and provide a lengthened northbound receiving lane to accomodate the dual-left turn movement from US-50 EB onto SR-131 NB and eliminate the short merge to one through-lane that currently exists.~|~21 - Safety~|~BFD8D26FDAA3890B52B21BEF442C94E686630054 91067~|~1~|~1~|~01/MPO~|~LAW Union Rome Trails & Walkways Phase 1. Proposed is the construction of a comprehensive trail system throughout the Union and Rome Township areas of Lawrence County, inclusive of the Village of Chesapeake and Proctorville, along with interconnections with other Tri-State Trail Systems. The trails would be utilized to accommodate pedestrian, bi-cycles, motored wheelchairs and other like equipment off the current corridor streets and busy roadways. The project is anticipated to be built in multiple phases, all targeted to interconnect to the Eastern Campus of Ohio University which would also serve as an interconnecting point of a proposed Park and Ride and Public Transportation facility. 80% KYOVA 20 Local Match (Ironton) 01/MPO/OT/Ironton~|~28 - Facilities for Pedestrians & Bicycles~|~3BF981E024184036B94A7EFCAFFA6A3DDDE17F6C 95935~|~1~|~1~|~01/STR~|~"01/STR/PV/ " Plan Split for Gue-265-(0.00-17.63); Gue-821-(0.00-0.47) & (0.60-4.97); Nob-265-(0.00-0.32)~|~~|~D9E4AA7E7AB6C4A5C02B9FB600928D15D521DDD8 120087~|~1~|~1~|~01/NFA~|~Created for J&C involvement.~|~44 - Other~|~C791C8E843E2CC9046C5AC5B0A83B2A1CFAA9EEB 93464~|~1~|~1~|~01/STR~|~Remove existing asphalt wearing surface and overlay with Micro Silica modified concrete on: SFN 0602612 AUG 119 0616 over Minster Creek SFN 5403340 MER 219 1380 over Beaver Creek SFN 7502788 SHE 119 0286 over Loramie Reservoir~|~13 - Bridge Rehabilitation~|~A9CA0D5E8B8DF57054EB9917768E59C3887D7DA7 96925~|~1~|~1~|~01/NFP~|~Added plan split due to funding~|~44 - Other~|~B04A2D7B6A1AEF8357D28D4291B3A3F1567B65A8 89052~|~1~|~1~|~01/S<2~|~Widen the existing roadway to three 12' lanes, including a dedicated two way left turn lane, curb lawn and sidewalks will be added on each side of the street and the signal at Russel Road/Wapak Avenue will be modified/upgraded as needed on Wapak Avenue from the JCT of Russel Road to West Parkwood. New storm sewer piping, catch basins, manholes, underdrains, and water main replacement will be done with Local funds.~|~04 - Reconstruction - No Added Capacity~|~E336DA6D7B2ED1BD137901F754C194916772EBE5 94239~|~1~|~1~|~01/IMS~|~District Wide Crack Sealing project on the Priority System for FY2022. Routes to be determined. (approx 100 lane miles) Routes to be determined.~|~~|~5182DA7236FEC05301E3906094D302C313B7E732 119406~|~1~|~1~|~01/NFP~|~Plan Split for Ohio Parks and Recreation Association (OPRA) funds.~|~44 - Other~|~2934152EBC16F2528A3DE490E2D49BCCA222BD6A 100696~|~1~|~1~|~01/STR~|~Crack sealing on rural routes.~|~99 - State Preventative Maintenance~|~52079C1E9AB2A9E5F79D9DE02F13E1F4F7FDA7A4 100696~|~1~|~2~|~02/S>2~|~Crack sealing on large urban routes.~|~99 - State Preventative Maintenance~|~4E57AF19F5BF4509582D9690F0CEC64470D2ED2B 100696~|~1~|~3~|~03/NHS~|~Crack sealing on NHS routes.~|~99 - State Preventative Maintenance~|~8AC6DE992B7CD77E42816C4D74454E81E451E502 121733~|~1~|~1~|~01/SAF/TWIN~|~Crosswalk upgrades.~|~21 - Safety~|~CB6816CC787D433610DCC2596FAFB2C5763E63CC 103717~|~1~|~1~|~01/S<2~|~Pavement 80/20 Fed/City OntarioSLM 6.40 to 8.73~|~05 - 4R Maintenance - Resurfacing~|~5F9823BA7B864083FDC8C4C52E0BF2ACF3E47023 103717~|~1~|~3~|~03/S<2~|~Pavement 80/20 Fed/City MansfieldSLM 8.73 to 9.30~|~05 - 4R Maintenance - Resurfacing~|~EAE31ABB7D74EE6BBEB864DCD0A2227BDBA41E36 103717~|~1~|~2~|~02/S<2~|~Pavement Repairs 90% 4TA7, 10% City of Ontario SLM 6.40 to 8.73~|~05 - 4R Maintenance - Resurfacing~|~CCA4FCA685A22B141AB3C1AEAF378724485F8266 103717~|~1~|~4~|~04/S<2~|~Pavement Repairs 90% 4TA7, 10% City of Mansfield SLM 8.73 to 9.30.~|~05 - 4R Maintenance - Resurfacing~|~ACC82286F91D5344CE20CC91DAC46448ACD3FBD5 103717~|~1~|~5~|~05/NHS~|~RIC SR 309 08.860 SFN 7001894 OVER RIC-30~|~13 - Bridge Rehabilitation~|~A81ADDE7B5AA4B7430885A10831CB685FCE8E964 103717~|~1~|~6~|~06/S<2~|~100% City of Ontario Items Urbanized Area Inside Corp. Limit (Items Such as Guard Rail, curb removed, curb, etc.): RIC-309-6.40 to 8.73~|~05 - 4R Maintenance - Resurfacing~|~5890C86880288B2F8A45F132FF0EF56BAFAFE1BB 103717~|~1~|~7~|~07/S<2~|~100% City of Mansfield Items : Urbanized Area Inside Corp. Limit (Items Such as Guard Rail, curb removed, curb, etc.): RIC-309-8.73 (Ontario Corp) to 9.30 (end at US30)~|~05 - 4R Maintenance - Resurfacing~|~5B81F3921C292164F120C98B95015CD898BECFA3 103717~|~1~|~8~|~08/S<2~|~Alternate Bid Item Pavement Markings.~|~~|~FD58C90BB18A65EE40B7E2C6BAD70E7F41FB7FA2 96355~|~1~|~1~|~01/SAF~|~SR-199 & Roachton intersection~|~01 - New Construction~|~534977C37596E7766438D0139849E6FBDDEDC971 103409~|~1~|~1~|~01/STR~|~Landslide repair. NOB 145 2.50. Work length approximately 350 ft. DSR NOB-001.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~78AB1439AD42E7E97558C42A30CA82F4A756800C 121140~|~1~|~1~|~01/STR~|~Resurfacing SR 39~|~05 - 4R Maintenance - Resurfacing~|~9249215D28D68E481257C89AF3D1EA4DD5D2061D 123239~|~1~|~1~|~01/S5K~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~79940C4380D3682025DFCC3211E3444BB21D7C5F 112668~|~2~|~2~|~02/SAF~|~Signal Replacement and backplates at SR-7 and SR-164 intersection.~|~21 - Safety~|~4FCDBF4D84BBD5163487DF8266081B42F65A3DC8 112668~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 7 from 0.00 to 3.58.~|~05 - 4R Maintenance - Resurfacing~|~EF1D4B0F065DC1C79491260A3D29B4766BD47DA4 106881~|~1~|~1~|~01/BRF~|~Federal eligible bridge replacement~|~10 - Bridge Replacement~|~957D4E50331673F64A98B6D03AB1DD5348EBE709 98913~|~1~|~1~|~01/STR~|~Pike County FLAP project. CR 84 1.72-3.93~|~05 - 4R Maintenance - Resurfacing~|~B202FE7F04B63A357C4714F22354E48B195CA82B 119471~|~1~|~1~|~01/BRF/CONN~|~Bridge replacement.~|~10 - Bridge Replacement~|~722767259CBFA397843427CABCA7A7EFE2255AA3 101735~|~1~|~1~|~01/SAF~|~Install new guardrail along MRG CR 2, 39, 47, and 56. Work includes posts and railing. Funded 100% federal.~|~21 - Safety~|~DFE1320110DFC16710E156021D2277D16BF025B6 103270~|~1~|~1~|~01/SAF~|~District wide raised pavement markers.~|~21 - Safety~|~3BE17247F6C90F13DFE7747C319D8527DFCFFEAA 118764~|~1~|~1~|~01/STR~|~Microsurfacing General system Routes Through District~|~05 - 4R Maintenance - Resurfacing~|~FEA98A4F2171087AB5FA13179BAE5106E5031068 96786~|~1~|~1~|~01/STR~|~Minor Rehab of COL-46 from SLM 1.37 to 4.09.~|~05 - 4R Maintenance - Resurfacing~|~A58FDC4F4D2057B6180A6CECE3F27B4069C94B5C 96786~|~1~|~2~|~02/S<2~|~Minor Rehab of COL-46 from 4.09 to 6.82.~|~05 - 4R Maintenance - Resurfacing~|~95AA4CED84C6F9F7BEF4709BF187EEBF3D6403C8 126296~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~42C51C7FE16D16B850D2AE14C0D19CF16B354CB6 112486~|~1~|~1~|~01/STR~|~AC Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~71D5365146C5D68F5FEC7861F7FBA1EB33A3CFE7 110380~|~1~|~1~|~01/NHS~|~Improvements to the intersection of US 23 at Rathmell Rd~|~~|~190FC4F5FAE7DD758F838AA4C857460F47397AFC 84481~|~1~|~1~|~01/NHS~|~This is for pavement work on NHS route.~|~05 - 4R Maintenance - Resurfacing~|~9C0C46B5162A2518181D6EB049B18472441ED0A9 84481~|~1~|~2~|~02/NHS~|~This plan split is for NHS bridge work.~|~13 - Bridge Rehabilitation~|~598C718AB4D695D5088C782176CE9604785F724C 84481~|~3~|~3~|~03/NHS~|~Replace storm 24" storm pipe from Mt Healthy corp line to bridge.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CBEA3A87C06DD6D0543B1D1B73705F918F734CED 84481~|~1~|~4~|~04/NHS~|~Type A guardrail installation~|~21 - Safety~|~0D9D18177A2112EE015A34DA35AA4E94D37D50BB 100660~|~1~|~1~|~01/STR~|~plan split for the roadway work in the Rural sections~|~05 - 4R Maintenance - Resurfacing~|~8840E2FC6EAD3A20BE273B48B108C6FD869E554D 95847~|~1~|~1~|~01/S<2~|~Concrete base pavement repair; asphalt resurfacing; 10' wide sidewalk construction, on East Stroop Road from Shroyer Road to East Dorothy Lane.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1CABFAA58C45EDAE43105CE887C68F17A5CD107F 122871~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~433E186A15C758FE29A2EA0A81C2EB7CA3887F3C 119400~|~1~|~1~|~01/S>2~|~Roadway reconstruction, safety improvements, bicycle and pedestrian enchancements~|~28 - Facilities for Pedestrians & Bicycles~|~47DFF0B5B217E6877DD1DCCB48AE379E5710851D 120583~|~1~|~1~|~01/BRF~|~Muni-Bridge funding for bridge replacement~|~~|~EC68D006DB1B8137DAB9923C494077DE3A6C983B 87452~|~2~|~2~|~02/ERD~|~Added Plan Split for 100% Local Item (Pump-Out Station)~|~~|~358B21DF946AE2BF200BB3387F3E875D5D14C0F7 87452~|~2~|~3~|~03/ERD~|~Added Plan Split for CE of 100% Local Item (Pump-Out Station)~|~~|~48E299BDE998A70C9883EACAC0838863AA4DE098 126020~|~1~|~1~|~01/STR~|~All work included in this plan split.~|~66 - Resilience Improvement - Highway Project ~|~6929611C96E82FF8A50C66C4812D8450815DAA1D 96102~|~1~|~1~|~01/STR~|~District Preservation Bridge Program - 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Rehabilitation on 4201779 KNO USR 36 29.50~|~13 - Bridge Rehabilitation~|~DC4A21B1C8948878767150AE63AC79C7C6AC77F3 82474~|~1~|~1~|~01/STR~|~Overlay SR 571 with fine graded aggregateSR 571 SLM 15.16 to 20.73~|~05 - 4R Maintenance - Resurfacing~|~0B2A33D038EC13C39B1EA22DCD73BF11487BDE6D 82474~|~1~|~3~|~03/NHS~|~Construct turn lane at Kruckerburg RoadUSR 127 SLM 14.62 to 14.63~|~05 - 4R Maintenance - Resurfacing~|~2C5C23FEF86B26B5BBE4BAD94DE68FFB1DA12FAD 82474~|~1~|~2~|~02/S<2~|~Overlay SR 571 with fine graded aggregateSR 571 SLM 13.65 to 15.16~|~05 - 4R Maintenance - Resurfacing~|~530F85D592A21F6C18C79258929FF083BCFFA2A3 126617~|~1~|~1~|~01/ENH/MCDO~|~Install sidewalks.~|~28 - Facilities for Pedestrians & Bicycles~|~6CE58335183CDC5A9F4622FA2B7E9F9AEF1EB150 119957~|~1~|~1~|~01/STR~|~added plan split.~|~44 - Other~|~13A05E8061DCDE8C6F5E333738A1694BDDE56311 106167~|~1~|~1~|~01/BRO~|~repair work eligible for bridge funds~|~13 - Bridge Rehabilitation~|~1001BDE16445180F577514075CE0D7AA61B503DA 114394~|~1~|~1~|~01/NHS~|~Culvert replacements.~|~04 - Reconstruction - No Added Capacity~|~3ACCF37CFB0E43A8F229FC70E363BF286F23DAAE 114394~|~1~|~2~|~02/STR~|~Culvert rehab.~|~~|~009C66DE2B80E409928E50E12CCE39D62E867998 101079~|~1~|~1~|~01/IMS~|~RPMs~|~21 - Safety~|~6D658FA0F8D7164731EAC71AC854367920BC2A53 115763~|~1~|~1~|~01/NFA~|~Bridge replacement project. MEG CR 27 3.96, SFN 5333016. Funded 100 federal.~|~10 - Bridge Replacement~|~98B37B35EE7003EDF03B298C50880879FCBE19CE 102855~|~1~|~1~|~01/NFA~|~D09 Block Project FY22~|~05 - 4R Maintenance - Resurfacing~|~F9A5694BC5128E66A595DDE80C01BFD25EC6092A 98313~|~1~|~2~|~02/SAF/COLU~|~This is the 100% City funded waterline work.~|~21 - Safety~|~399CE9DB62A3799867B5F60319C690CF79320A3C 98313~|~1~|~1~|~01/SAF/COLU~|~This is the safety program funded portion of the project. To install left-turn lanes on all approaches and a rt. turn lane on the west leg. Update traffic signal and intersection lighting.~|~21 - Safety~|~B91F7B18B61391A02A96A7037D0D21E6E57D0A9D 107637~|~1~|~1~|~01/STR~|~Resurfacing on SR 66 and SR 117 using district preservation funds (4PF7 - 80% and 4PS7 - 20%). All work on SR 66 is in this plan split. Work on SR 117 from the Van Wert County line to the Lima Urbanized Area Limits at Wapak Road (SR 501) at 10.77.~|~05 - 4R Maintenance - Resurfacing~|~CA76E8361CDE0606D356BA161BD9F3A11AA5908A 107637~|~1~|~3~|~03/S<2/LIMA~|~Resurfacing of SR 117 inside of the City of Lima. Work on SR 117 from 17.11 to the City of Lima corporation limits at 18.28. 80% federal funds from the District Preservation Program budget with the 20% match provided by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~E41953EB819445BA3F1D865BF53BD6BDF5254370 107637~|~1~|~2~|~02/S<2~|~Resurfacing of SR 117 inside the Lima Urbanized Area but outside of any municipality. On SR 117 from the Lima Urbanized Area Limits at Wapak Road (SR 501) at 10.77 east to the end of the project at Seriff Road at 12.73 and from the City of Lima corporation limits at 18.28 until the end of the work at the concrete pavement just east of Leonard Avenue at 18.38. Federal and state District preservation program funds. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~DD2ADB0683D1A155961E7F4F207B65886DE6B2DB 107637~|~1~|~4~|~04/NFP/LIMA~|~Items paid 100% by the City of Lima.~|~05 - 4R Maintenance - Resurfacing~|~51B142C97C07AFA71C00017705A5D5FEB0AE39F8 101863~|~1~|~1~|~01/ENH~|~A multi-use path.~|~28 - Facilities for Pedestrians & Bicycles~|~9F174F568ECB7E3F82E918C66D7A74373E7193D7 117568~|~1~|~1~|~01/NHS~|~added plan split.~|~47 - Bridge Preventive Maintenance~|~78ED2C8FA52015E9864C81319C838766C7D325BA 88135~|~1~|~1~|~01/S>2~|~add local roadway connection on east side of IR75, aka GE parkway. Provide southbound IR75 ramp to GE Parkway from Glendale Milford Road.~|~~|~F4F3E098E72FF32F56250CAE9B55A42611AEB956 92969~|~1~|~1~|~01/NFA~|~"01/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Resurfacing on 1) Cos-SR 206-00.00 to 03.41; 2) Cos-SR 206-03.85 to 14.51;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~486B685ADD295B84A004F8449BA65C21208E979E 92969~|~1~|~2~|~02/NFA~|~"02/NFA/OT/ " - District Preservation Marking Pavement 4MP7(100% State) - No CAP - Striping and Raised Pavement Markers on 1) Cos-SR 206-00.00 to 03.41; 2) Cos-SR 206-03.85 to 14.51;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~65C913BF361AB8EA452A850186E5CAE7E1C591FD 116685~|~1~|~1~|~01/STR~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~65D02355D74D58D76D9D4D92CE205CA8651AA867 100505~|~1~|~1~|~01/S<2~|~ROS 104 (17.41-17.98)~|~05 - 4R Maintenance - Resurfacing~|~62CBEBDE323EE302C6C7B28CF5251EC885D8F78E 100505~|~1~|~2~|~02/STR~|~ROS 104 (17.98-22.19)~|~05 - 4R Maintenance - Resurfacing~|~F8134F7869A3A154F3FC43B804F46151D0D12A7B 116741~|~1~|~1~|~01/MPO/CUYF~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~C4AF60FF0C280900AD4B214625AAF3A3E1A7F30D 122034~|~1~|~1~|~01/NFA~|~Created for ODOT TID funding~|~~|~14546B885EB25406ECB80ACB533276E165E9FEFC 86645~|~1~|~2~|~02/BRO~|~D6 funding for rehab (patching & sealing) on 1 bridges - BR eligible2502496 FRA US40 11.58 Intersect: Over Sr315~|~13 - Bridge Rehabilitation~|~A13A990E0972F0E62A4584664A85F32E5C173B24 86645~|~1~|~1~|~01/NHS~|~Columbus urban paving on US-40/W Broad from SLM 10.55 - 12.27~|~05 - 4R Maintenance - Resurfacing~|~B1FBB68AAE2370F88F9EC138E6CB24BBE2815A68 86645~|~1~|~3~|~03/NHS~|~100% City of Columbus items~|~05 - 4R Maintenance - Resurfacing~|~23F74E5F2247CD6AF5FB7599FD713B088DD593A3 90440~|~1~|~1~|~01/NFA~|~Grade, shape, crack seal, chip seal and fog seal and resurface areas at the Auglaize County Fish Hatchery, Darke County Wildlife Area and the Mercer County Wildlife area at the Auglaize County Fish Hatchery along SR 364, Darke County Wildlife Area on USR 36, and Mercer County Wildlife Area on SR 703.~|~05 - 4R Maintenance - Resurfacing~|~65A7059BA3EBFD22B8D7F6F115D0B88A7BDF0789 103738~|~1~|~1~|~01/ENH~|~SRTS Elyria City Schools~|~28 - Facilities for Pedestrians & Bicycles~|~327D772C2EB9D0BAE256CB7A5F9968826828442A 107286~|~1~|~1~|~01/IMS~|~Plan split for bridge work on the interstate~|~13 - Bridge Rehabilitation~|~D4FC8D472C6A8F555240C09B192E45C6752B6998 107286~|~1~|~2~|~02/NHS~|~Split for bridge work on the NHS~|~13 - Bridge Rehabilitation~|~F2A2E9BB8E61562574F7D52FE2CAD67D5367CF2E 107286~|~1~|~3~|~03/NFA~|~Split 3 for repair work to the Towpath Trail under the Innerbelt Bridges~|~44 - Other~|~785BAE0AF8C2990AB01D50BA135A875C0B4A56CF 103366~|~1~|~1~|~01/STR~|~Emergency project to repair a landslide. WAS CR 79 1.29. DSR WAS-002.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~03A3C62EB2DB9C408F572294A858A78A6E27BCFA 96887~|~1~|~1~|~01/NFA~|~Bridge replacement.~|~~|~A9C365BE2CA4789E4A5595E001B649DA854CB6BC 120359~|~1~|~1~|~01/NFP~|~Guardrail repair/maintenance work order.~|~21 - Safety~|~930813F1F4874A4F0E4A94BC3F74D23679A80F14 97721~|~1~|~1~|~01/MPO~|~Resurface Washington Street using local funds.~|~05 - 4R Maintenance - Resurfacing~|~52E2AFEECF611FA9D299B7022EDEB57C25A98E4D 115637~|~1~|~1~|~01/IMS~|~Paving of old weigh station to convert it to a truck parking area on NB TUS-77~|~04 - Reconstruction - No Added Capacity~|~0EA3946603684E3F3F5E46328830B8305ADDD882 89366~|~1~|~1~|~01/ENH/Zoar~|~"01/ENH/OT/Zoar" - Construct a brick sidewalk and decorative lighting on each side of Main Street (SR 212 in the vllage of Zoar) from 5th St to 1st St, including ADA ramps and storm sewer relocation.~|~28 - Facilities for Pedestrians & Bicycles~|~06D7E3DB4E2D155A2800361F9130DD3FC5016B97 25492~|~1~|~1~|~01/IMS~|~Rehab pavement between LUC IR75 0-0.27, LUC IR75 0.91-1.66 and WOO IR75 30.71-32.88~|~~|~88B7A4186E920ED008B758945F0BE0A9696D0EBC 120542~|~1~|~1~|~01/MPO~|~Federally eligible items.~|~28 - Facilities for Pedestrians & Bicycles~|~6CAF706AE526849FFA6A9610001903EA01D23935 117645~|~1~|~1~|~01/SAF~|~ITS maintenance on power services, fiber optics and other misc. related work~|~44 - Other~|~0A9620B04ADF25B608C2366A5F572E2C07FEE16B 96412~|~1~|~1~|~01/NFP~|~Emergency bridge project. Beam replacement on WAS 50 0489L, SFN 8401381. Funded 100% state.~|~13 - Bridge Rehabilitation~|~7E764A8B6950900423135C1047DB59440AA13913 93100~|~1~|~1~|~01/NHS~|~Bridge maintenance to structure HAM-562-0147 to include spot painting, steel retrofits, and drainage repair. SFN: 3113914 and intersects: Ross Avenue;CS RR~|~13 - Bridge Rehabilitation~|~DDEA7DDBB3678F12DCD4AEEFBECE01049B6172BA 113760~|~1~|~1~|~01/BRF~|~OBPP funded plan split~|~10 - Bridge Replacement~|~6ECF41D2F6739C6044FB4DC057AB5A9DD877A08D 25440~|~1~|~1~|~01/NHS~|~SFN 7804652 SR82 18.05 OVER TRU SR46 7.31~|~~|~15E4502E630FAA8B9B684089489D26CB8539EF86 111049~|~1~|~1~|~01/MPO/NCAN~|~Resurfacing of N Main St from 7th St to Orion St in the City of North Canton.~|~05 - 4R Maintenance - Resurfacing~|~CB62D48B4D4756A6EA5809D84508AA94ACEE48AF 114715~|~1~|~1~|~01/STR~|~Chipseal.~|~05 - 4R Maintenance - Resurfacing~|~FC0B31C538BA866CBB243A3FAAD5D9F42A120AF9 107922~|~1~|~1~|~01/STR~|~Repair or replace rural culverts.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E8C9AB855A0AB8DC5EDE7E4C6E84849DAF60BE7B 122457~|~1~|~1~|~01/S5K~|~All work included in this split.~|~04 - Reconstruction - No Added Capacity~|~A13B722750FF7888ADED05D598ED93F4DB370F7C 122457~|~2~|~2~|~02/S5K~|~All part 2 work included in this split. Resurfacing on E Wyandot Avenue from TR 122 to TR 124. ~|~05 - 4R Maintenance - Resurfacing~|~CEDA8FE0744090F0A97EEE0259EFC8466735F36C 95267~|~1~|~1~|~01/IMS~|~A maintenance contract to perform mowing on a 2 district basis; and, perform necessary related work.~|~44 - Other~|~E6E2089C6B961993DE677EF5AFFB9D966C4C61D0 120756~|~1~|~1~|~01/S50~|~Pavement rehabilitation utilizing 100% State Oil & Shale (4SH7) funds up to CAP.~|~05 - 4R Maintenance - Resurfacing~|~716C71F60A772F854439F0CEE9B24FF7E8499B40 94133~|~1~|~1~|~01/S>2/STRE~|~Resurfacing of POR 303 from 2.71 to 4.98, Urban Paving in the City of Streetsboro.~|~05 - 4R Maintenance - Resurfacing~|~1A6DAA5202DBEAA9889F1E5D274C13BC0AE67BEB 94133~|~1~|~2~|~02/S>2/STRE~|~100% items paid by the City.~|~05 - 4R Maintenance - Resurfacing~|~F443F6CD8808CEE24C6978F080A002631350F7AB 120695~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 310/Duncan Plains Road~|~21 - Safety~|~D3FBA115E0106C2D499A603139AB084AFA1636E1 109473~|~1~|~1~|~01/NFP~|~Systematic sign replacements on various routes throughout District 4.~|~21 - Safety~|~2E3B83E28FCA113098BABC5406A2E6A0E1AF5E7D 118567~|~1~|~1~|~01/STR~|~added plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F6635960E99709C403924FDD0ADFA1864E7B8055 106760~|~1~|~1~|~01/ENH/ZANE~|~City of Zanesville Transportation Alternatives (TA) Program - 4B37 (80% Federal) / TRC (15% LNTP) / LNTP ( 5% Local) - See CAP Comments - Upgrading lighting and sidewalks along the north side of South Street between 3rd Street and 6th Street.~|~28 - Facilities for Pedestrians & Bicycles~|~3B9CDD635A607ADE0EDFC2A4F95BCE977D3E3CAB 119870~|~1~|~1~|~01/NFA~|~Bridge replacement project. GAL CR 40 2.35 (SFN 2741210).~|~10 - Bridge Replacement~|~4EA27343AD98B7082C76E286E1DE3F19607A0E13 119870~|~1~|~2~|~02/NFA~|~Plan split for a change order to the state to purchase materials. ~|~10 - Bridge Replacement~|~4C809D192FD23900E419EAF05B386E715822B84F 111346~|~1~|~1~|~01/NFA~|~Split for resurfacing work in the park~|~05 - 4R Maintenance - Resurfacing~|~753B42E289F1B67F440B46551A5516F39A23395B 92986~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on: 1) Per-SR 669-00.00 to 06.34; 2) Per-SR 669-06.97 to 09.72:~|~05 - 4R Maintenance - Resurfacing~|~C57CC05B8E40DFFB9BDF015DBA609550359AE7F0 92986~|~1~|~2~|~02/STR~|~"02/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Per-SR 669-09.72 to 10.15~|~05 - 4R Maintenance - Resurfacing~|~5F9610EEE8569D914248710EA62B74BADEF490CF 104102~|~1~|~1~|~01/IMS~|~Plan split for bridge work~|~13 - Bridge Rehabilitation~|~693BD36D49A8141CEE951E48473415FFAE90509F 110308~|~1~|~1~|~01/STR~|~Guardrail project LAW 775 7.13-7.39~|~21 - Safety~|~A91D90F4377FAB28FAB6B7B99D2FF920BDCF8F96 88734~|~1~|~1~|~01/IMS~|~Resurfacing / Mill and Fill~|~44 - Other~|~380290F59BE543343B88931EB3F791B31E211240 113539~|~1~|~2~|~02/NFP~|~District Preservation Funding - 4PS7 (100% State Funds) - No CAP - Funds to upgrade the the undamaged section of guardrail to match the upgraded portion~|~13 - Bridge Rehabilitation~|~E9A552E476C39708A9DF34CC9F5F3CFA5CC2BC30 113539~|~1~|~1~|~01/NFP~|~District 5 State Structure Damage Repair Funds - 4SR7 (100% State) - See CAP Comments - Deck Edge repairs and replacement of damaged guardrail on the bridge and approach to SFN 6004997~|~13 - Bridge Rehabilitation~|~2A27DDE3E24FFB06CBDB59EA44D29AD155B82521 88408~|~1~|~1~|~01/BRO~|~Bridge replacement project. MOE 800 11.04. SFN 5603188. BR eligible funded 80 federal/20 state.~|~10 - Bridge Replacement~|~2BB3D7DC85AD6FBC38C282C3B64170955127CB1E 107793~|~1~|~2~|~02/S>2~|~Minor work on SFN 2102978, DEL-257-3.08~|~47 - Bridge Preventive Maintenance~|~4621C8A9889155896DC00E0EEBCD6D9BA851EA61 107793~|~1~|~1~|~01/S>2~|~DEL-257 from 1.53 to 5.69~|~05 - 4R Maintenance - Resurfacing~|~1ED65A63F37DB7FB0906340243FF9964A4B9013F 107793~|~1~|~3~|~03/STR~|~DEL-257-5.69 to 7.77~|~05 - 4R Maintenance - Resurfacing~|~1326508B0044595E598F515724F2EFB8F7C2EAD4 100854~|~1~|~1~|~01/STR~|~Overlay on JAC 140.~|~05 - 4R Maintenance - Resurfacing~|~B6391BA3D254572B5F28B949DEA3FA00B32094AF 110389~|~1~|~3~|~03/NFA~|~Resurface with asphalt concrete~|~05 - 4R Maintenance - Resurfacing~|~A89A2750A5A07C47775FD0707ABE369E92660FBF 110389~|~1~|~1~|~01/NHS~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~6D85A7D142FBFB56AC38F2FF63C0CC8024B1FE77 110389~|~1~|~2~|~02/STR~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~16D21D72D6B30B66B0CB467D865802C13F8113E5 81656~|~1~|~1~|~01/S>2/MACE~|~Widening of State Route 82 from SLM 4.65 to SLM 5.92, in the City of Macedonia, Summit County, Ohio.~|~03 - Reconstruction - Added Capacity~|~A33828B44F7D8AA170317E662D7256147C5089D5 81656~|~1~|~2~|~02/S>2/TWIN~|~Resurfacing of SR-82 from SLM 5.95 to SLM 6.19 in the City of Twinsburg, Summit County, Ohio.~|~17 - Construction Engineering~|~DBC8C70D6435A22202FD3A3AC230117195436D45 109676~|~1~|~1~|~01/STR~|~Resurfacing SR 331~|~05 - 4R Maintenance - Resurfacing~|~31C97E8BB715B041ADE0852EF74340C6D984BB44 111505~|~1~|~1~|~01/NHS~|~Slide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~564761D879D43BC00298C12E6A16CB900BDCD657 88699~|~1~|~1~|~01/STR~|~Overlay US 127 in Mercer County with concrete asphalt:MER US 127 SLM 0.00 to 8.83~|~05 - 4R Maintenance - Resurfacing~|~2540BD94C6619352AD248F17CF382E6FE4DCC5FA 110841~|~1~|~1~|~01/NHS~|~Culvert lining on US 30 in Paulding County at the state line. Federal and state funds from the District Preservation Program budget.~|~04 - Reconstruction - No Added Capacity~|~094DD0B26383ABC8D8E59814D753ED9EF0C38E21 119871~|~1~|~1~|~01/NHS~|~Installation of drainage structures~|~66 - Resilience Improvement - Highway Project ~|~2811C7611728237DCB91F3C1C591C94840E1E507 115830~|~1~|~1~|~01/NFP~|~Split for building demo work~|~04 - Reconstruction - No Added Capacity~|~966BD84B45053209617CE13AD612C4A26F0AFE3D 97011~|~1~|~1~|~01/NHS~|~From SLM 14.9 to 16.11~|~05 - 4R Maintenance - Resurfacing~|~7DBD53402D505C969F013B47F970EDF747DA9782 110018~|~1~|~1~|~01/IMS~|~Noise Wall Repair.~|~44 - Other~|~5BFCC7ECED7F43C8082856DEF984C2CB98FF9E94 120615~|~1~|~1~|~01/SAF~|~Construct roundabout on CR2 (Hayes) at CR119 (Richardson)~|~21 - Safety~|~CFF058000F0D162B83F793B4563A6E1C3E265F59 102539~|~1~|~3~|~03/STR~|~Replace culvert on rural route.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~C49DA2A74AA2E4AEE81E411179FA2D755A001A6E 102539~|~1~|~4~|~04/STR~|~Bridge maintenance~|~47 - Bridge Preventive Maintenance~|~2574D7B0937763A8CF21E7A65B6E07FAC3C353E8 102539~|~1~|~5~|~05/S>2~|~Bridge maintenance~|~47 - Bridge Preventive Maintenance~|~32DB3733FC5080325DC028515F3F587328AF3246 102539~|~1~|~1~|~01/S>2~|~plan split for pavt work in the large urban section:~|~05 - 4R Maintenance - Resurfacing~|~503736848C2515B370D2107F013AA3E7115201EB 102539~|~1~|~2~|~02/STR~|~plan split for the pavt work in the rural section~|~05 - 4R Maintenance - Resurfacing~|~75B045AC25D09D0B743A9126DA0D6001705EC5D8 99728~|~1~|~1~|~01/MPO~|~New sidewalks along Moore Road from Arlington Road to Charleston Drive.~|~44 - Other~|~596B4984BE30822F4069E39998146C8A9AA6DE98 109248~|~1~|~1~|~01/NFA~|~Add Split~|~05 - 4R Maintenance - Resurfacing~|~94ED619F932BA13E85D84E662F9CF9F53992CEFF 106197~|~1~|~1~|~01/NFP~|~Replacing the linked culverts.~|~04 - Reconstruction - No Added Capacity~|~83AAD432EBF7D8E1A8530E06A45C2C41A1379CC7 119281~|~1~|~1~|~01/NHS~|~Replace FRA-710-3.69 structure over Bison Run~|~04 - Reconstruction - No Added Capacity~|~C234CDBB411505DB2F7CE42830A74D7452A05C9D 116432~|~1~|~1~|~01/MPO~|~Add sections of Shared Use Paths to Anthony Wayne Trail and Waterville-Monclova Rd.~|~28 - Facilities for Pedestrians & Bicycles~|~4F6161B50A17217C5C5616C836AB2E0A8D01C5DB 113174~|~1~|~1~|~01/STR~|~Bridge replacement project. VIN 50 28.74, SFN 8200661. Funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~6AD49216A34F029720FC733C2EF2DEFDF5DD4AC6 120061~|~1~|~1~|~01/NFA/LCEO~|~Rehabilitation of CR 26~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1044C0A23963F49999CA5B77BB53DFE67E830237 85553~|~1~|~1~|~01/IMS~|~"01/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP - Rehabilitation on: 1) SFN 6002498 MUS IR70 6.94 Intersect: TR 271 Chapple Hill Rd #; Not BR Eligible for Rehabilitation: Length=112 SD/FO(0) SR=86.4 DSR=7; 2) SFN 6002498 MUS IR70 6.94 Intersect: TR 271 Chapple Hill Rd #; Not BR Eligible for Rehabilitation: Length=112 SD/FO(0) SR=87.4 DSR=7;~|~13 - Bridge Rehabilitation~|~704E86B229292273E4A46E54981B1A74BC228781 99475~|~1~|~1~|~01/S<2~|~Guardrail upgrade/replacement project. WAS CR 4 1.76-3.62 and 4.57-4.64. Urban other federal aid funded 80 federal(WWW-MPO)/20 local.~|~21 - Safety~|~20D1E44EF19CC49C8091DBF98389F9B79A868A4E 99475~|~1~|~2~|~02/STR~|~Guardrail upgrade/replacement project. WAS CR 4 3.62-4.57 and 4.64-4.72. Rural other federal aid funded 80 federal(WWW-MPO)/20 local.~|~21 - Safety~|~245A04E3FE223C9C8D3445790EB3B3421F01F342 113719~|~1~|~1~|~01/SAE~|~Roundabout related items - 100% Fed Safety~|~21 - Safety~|~DE338663A56A59DBC20A49F4F35751DC6017AE55 119067~|~1~|~1~|~01/MPO~|~OKI TA funded portion of construction with a 20% local match.~|~~|~D9167E23F30DFD9C5F4E2A9E7811B67EB1A74B68 107897~|~1~|~1~|~01/STR~|~Rural Plan Split: DEL-257-14.26-22.62~|~05 - 4R Maintenance - Resurfacing~|~3E253CB4D85BDC9CEB332643A2E8D7AF3F202946 107232~|~1~|~1~|~01/NFP~|~Mowing work~|~99 - State Preventative Maintenance~|~511FF63164DC1CFF52F29672AB15195EDB256BBA 80128~|~1~|~1~|~01/STR~|~Replace the bridge deck & clean and paint existing steel beams with system OZEU paint for HOL-62-1178 (SFN 3801233) with minimal approach roadway work.~|~13 - Bridge Rehabilitation~|~AA030E161262E5FA5D4E442715E0C0A36883F986 97316~|~1~|~1~|~01/STR~|~ROS CR VAR GR~|~21 - Safety~|~B25537EE3246CBF783BB8BE275CED735794C3F26 102685~|~1~|~1~|~01/NHS~|~Bridge rehab on NHS bridge.~|~13 - Bridge Rehabilitation~|~0F14D1DAAC9D8C45398F7FA3C5C4867901925992 87225~|~1~|~1~|~01/NFA~|~0103608 ADA SR137 0.32 Intersect: Eastland Run 100% State. 01/NFA/BR/State~|~10 - Bridge Replacement~|~4A989C5DA4205A620687AF51FE8E41CE8DC74278 100002~|~1~|~2~|~02/NFA~|~Not on Fed Aid System Pavement: WAY-604- 4.17-18.59.~|~05 - 4R Maintenance - Resurfacing~|~A6A8AC78780E391CF2B39FA27F365C01801BD984 100002~|~3~|~3~|~03/NFA~|~Bridge Work.~|~13 - Bridge Rehabilitation~|~8FD3966C33BE29855F092DEF39EDD151768D3E23 100002~|~1~|~4~|~04/STR~|~Bridge Work on STP Rural Portions~|~13 - Bridge Rehabilitation~|~A78D431D2AA4989E59BB14B88905C8F422A836B9 100002~|~1~|~1~|~01/STR~|~STP Rural Pavement: WAY-604- 0.00-1.00, 1.13-3.80, 18.59-20.66~|~05 - 4R Maintenance - Resurfacing~|~9F33A3FB109801B89381A2316E659F933175F0F3 118070~|~1~|~1~|~01/SAF~|~Install Roundabout at SR 721/US 36~|~21 - Safety~|~A2402871C52D2E89DCD8E8E0DFBF9666E08F4EF4 90695~|~1~|~1~|~01/MPO~|~LUC CR548 0.25-0.55 LUC Jackson Blvd Transit Center - MPO Enhancment monies are being used for the project~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8709374E52310FA49E2EE7250BCC18DC07680FD4 122344~|~1~|~1~|~01/MPO~|~Plan split for eligible work for the resurfacing and bike lane striping.~|~05 - 4R Maintenance - Resurfacing~|~E507BFB017A7284AE209FE2D48CE8F9A97CB9BDE 98637~|~1~|~1~|~01/STR~|~SFN 5400139, MER-29-0321 and SFN 5400732, MER-49-0490 on Wabash River - remove asphalt wearing surface and water-proofing from non-composite box beam structures. Repair T connections over piers. Install SDC hard overlay (non-composite).~|~13 - Bridge Rehabilitation~|~C60BC48920E17946355DB7FE6F6B492C5222C264 110509~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Pier encasement on SFN 1602934 which is not BR Eligible: L= 263; SD/FO 90); DSR 7; SR 87.9~|~13 - Bridge Rehabilitation~|~EA54616FCBD6A84497E4586E2643DE01AC3623DB 97861~|~1~|~1~|~01/STR~|~WOO-65-12.81 culvert~|~04 - Reconstruction - No Added Capacity~|~5270715CF040AFF0AE161F8085F114243DCC7AA5 24106~|~1~|~1~|~01/BRO~|~80/20 fed/local funding split using federal local bridge program funding. 1830228~|~10 - Bridge Replacement~|~00AF756373297B0CAB834CB4B6C5445026DA5009 88724~|~1~|~1~|~01/BRO~|~4401913 LAW SR93 19.54 Intersect: Kimble CreekBrdg Replacement 80 Fed/20 State. 01/BRO/BR/State~|~10 - Bridge Replacement~|~27F5F1319D13FFE274D109BFF8DA5A6DB5CF4E79 111582~|~1~|~1~|~01/STR~|~CEAO Funded - Major Collector~|~05 - 4R Maintenance - Resurfacing~|~81B4C214847CE75D184B0D905A91736FB9C5F3A4 111582~|~1~|~2~|~02/NFA~|~CEAO funded - Minor Collectors~|~05 - 4R Maintenance - Resurfacing~|~6FF015E62E0D7B15CCCDE0D7CAB5EAB97DB8C889 126233~|~1~|~1~|~01/SAE~|~Install roundabout.~|~21 - Safety~|~695DAED1CC35A8F264ABE1DD5922B2EE2C585790 121010~|~1~|~1~|~01/NFA~|~Plan Split to resurface campgrounds in Ceasar Creek State Park~|~28 - Facilities for Pedestrians & Bicycles~|~85433D020E0856A182EA2959290A279A606C9FDF 101275~|~1~|~1~|~01/NHS~|~Resurfacing SR 2 in Lucas and Ottawa Counties.~|~05 - 4R Maintenance - Resurfacing~|~4FF3067BA011552FE8ABBE493B922B4DD2108629 115187~|~1~|~1~|~01/S>2~|~Landslide/slope repairs.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8D2D92A8E80909E059F4B6221C1F6A96B9E74163 105171~|~1~|~2~|~02/STR~|~Superstructure replacement.~|~28 - Facilities for Pedestrians & Bicycles~|~77EFAA8652D045E514931CD554C4C73CBB37C3E1 105171~|~1~|~1~|~01/STR~|~Minor bridge rehab.~|~13 - Bridge Rehabilitation~|~C716801BFEF46AE53BD5FC78339DA3066A867B33 95231~|~1~|~1~|~01/SAF~|~100% CEAO Safety funded guardrail replacement.~|~21 - Safety~|~F37D5F7574307052CD1AEF69E29D229087FC6008 114951~|~1~|~1~|~01/BRF~|~CEAO LBR funds~|~10 - Bridge Replacement~|~3B1198DF67721489468FA942C7211D3A598D2F18 115548~|~1~|~1~|~01/NFP~|~2 year lighting maintenance on various routes in ATB, MAH and TRU counties.~|~21 - Safety~|~5BC48EA077A046EF5CB2A11D9DE96CCDDF86A54C 102765~|~1~|~2~|~02/NHS~|~Plan Split 02 created for NHS routes~|~05 - 4R Maintenance - Resurfacing~|~A0300D7A4FD6F1B0BA2C6C7BE49DC0E7219B5A6D 102765~|~1~|~3~|~03/S<2~|~Plan Split 03 created for STP < 200000 routes~|~05 - 4R Maintenance - Resurfacing~|~8F537BCF54BEE920892F4E0444DE82D8E878454B 102765~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~AA8CA82FA0F4FE8FA88670B582466AC8144AC58E 105842~|~1~|~1~|~01/IMS~|~Added plan split~|~47 - Bridge Preventive Maintenance~|~48E5B2B7A8535427923A016566FBEC4B94E26484 91536~|~1~|~1~|~01/SAF~|~Project includes the addition of left turn lanes at the intersections of Adams, Niagara, and Dolphin Streets (if warranted), upgrades to the existing signalized intersections with Compton Road, and addition of traffic signals at the intersections of Adams, Niagara, and Dolphin Streets (if warranted).~|~21 - Safety~|~E2C99A377E741B36D38E9007FAF0CF33BB22AF42 114131~|~1~|~1~|~01/ENH~|~Plan split for MPO 4TC7 funds.~|~~|~AB312395C4F875D4F8924E4D7D8453B3E7601A10 114131~|~1~|~2~|~02/NFP~|~Plan split for project work using 100% Local funds.~|~~|~5DE68794F0F08F1D77A43B78AA7142BD6FD0BBD7 122504~|~1~|~1~|~01/STR~|~Bridge replacement project on MRG 376 5.91 (SFN 5801656). Funded 80% Federal/20% State.~|~10 - Bridge Replacement~|~1629B86A9DFF6343687A1A64A991F846E2FFB1F9 122504~|~1~|~2~|~02/NFA~|~Bridge replacement project on MRG 669 11.83 (SFN 5802150). Not on the federal aid system funded 100% State.~|~~|~00677816C7471F8E5C352AD143EECEDEE13A916B 76807~|~1~|~1~|~01/IMS~|~100% UNFU plan split~|~04 - Reconstruction - No Added Capacity~|~68BE3672D239D4A7980FD97681422A387E562019 103828~|~1~|~1~|~01/S>2~|~Pavement resurfacing of CR72 from CR10 to CR21.~|~05 - 4R Maintenance - Resurfacing~|~EF81B71FB69A0E2D0993E3316136E6E1708573B9 103828~|~1~|~2~|~02/S>2~|~Pavement resurfacing of CR21 from CR106 to CR72.~|~05 - 4R Maintenance - Resurfacing~|~4F65D9ED5DD5F2730A24E27F1516B51710AFB35C 103828~|~1~|~3~|~03/S>2~|~Resurfacing of CR21 and CR72. Cost in excess of cap amounts.~|~05 - 4R Maintenance - Resurfacing~|~EE300266EA483116DF8E5F406002457F54D02DED 110770~|~1~|~1~|~01/STR~|~Landslide repair. MEG 124 63.33-63.36. Funded 100% State ER.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CC641E3D896F573477756EDABB62BBDBAD8E1488 91785~|~2~|~5~|~05/IMS~|~Pavement repair on FAY-71-9.45 to 14.66 & MAD-71-0.00 to 4.56 (90% 4PF7/10% 4PS7)~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1CCAB6DB66D52BA631DC2C4E28F11E81C02016E7 91785~|~2~|~6~|~06/IMS~|~Bridge work on FAY/MAD-71 (90% 4PF7/10%4PS7)24021652402289240225424023192402343240240824023784902947490291249029714903064490309949031294903153/4903188 - joint sealer~|~13 - Bridge Rehabilitation~|~401A9575D7BBF70CC96433130AB76020A91F01E7 91785~|~1~|~1~|~01/NHS~|~Minor pavement work and resurfacing on FAY-35-7.51 t0 12.05 (80% 4PF7/20%4PS7)~|~05 - 4R Maintenance - Resurfacing~|~4A2573B16B2E859C42161259E76602D2A87C8DF4 91785~|~1~|~3~|~03/NHS~|~Bridge work on FAY-35 (80% 4PF7/20% 4PS7)240089824009282400855240086324007902400839~|~13 - Bridge Rehabilitation~|~9C26F84D3E01D9A2F8653CCE4FE47EE9F3D444B8 91785~|~1~|~4~|~04/NHS~|~Pavement marking and RPM's on FAY 35 & 435~|~05 - 4R Maintenance - Resurfacing~|~B3F53E4EEA17305015942160578126734920512E 91785~|~1~|~2~|~02/STR~|~Pavement rehab and resurfacing on FAY-435-1.26to1.31 and 1.50 to 1.67 (80% 4PF7/20% 4PS7)~|~05 - 4R Maintenance - Resurfacing~|~D6735752EFACA97BAFB54887A2ECFFCA73BED50C 119793~|~1~|~1~|~01/S5K~|~All work is included in this split.~|~21 - Safety~|~9C0399F81993043AF908EBF47AA99197993EECE3 88505~|~1~|~3~|~03/S>2/Prbg~|~resurface WOO 65 13.92-17.71; Fed/Local - Perrysburg Corp Line to SR 25~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0C30C9051C85AEB3D8FE2D2E08E72606B5EC3FF9 88505~|~1~|~4~|~04/S>2/Prbg~|~plan split for 100% local items~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~357E7AF50AD6DEC0AAD3381D9000345024CF79AF 88505~|~1~|~2~|~02/S>2~|~resurface WOO SR 65 13.59-13.92; URBAN - near Roachton Rd to Perrysburg Corp Line~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~3AB161734EA52D86BB34C384880C476DB31E91D8 88505~|~1~|~5~|~05/S>2~|~Bridges SFN 8702705~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4567A42522C25A6DA3574B89340293F8331BEECA 88505~|~1~|~1~|~01/STR~|~resurface WOO SR 65 11.99-13.59; RURAL - SR 64 to near Roachton Rd~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~A44684CA4D72E4BB1F0D4C19CC31AA8DE3AAFE1A 97177~|~1~|~1~|~01/SAF~|~Reconstruct the traffic signal and intersection at Home Street to realign the intersecting roads and drives.~|~21 - Safety~|~CEA55E450344B5CE81CAFFFCE4CF1B5F3F9D2D40 121692~|~1~|~1~|~01/SAF~|~Radar detectors.~|~21 - Safety~|~16D8DFE92881BFE5BE86217AC9E383C669B56E07 116269~|~1~|~1~|~01/STR~|~Replace box beam superstructure~|~13 - Bridge Rehabilitation~|~926307723D691F9A945C4E4B21A0B76D1C96A834 119161~|~1~|~1~|~01/STR~|~Two-lane resurfacing project using an asphalt overlay treatment. ~|~05 - 4R Maintenance - Resurfacing~|~4AB5F292A296C1207023928D28C0FB60E475CADF 97358~|~1~|~1~|~01/NFP~|~Highway Lighting Maintenance~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BD73680480839FE2680593584606DD9A86ACA334 108020~|~1~|~1~|~01/SAF~|~Replace Loop Detectors with Radar Detection at:LOR-82 & Durkee RdLOR-82 & Island Rd~|~21 - Safety~|~D002AFAFFE1EF2D14F661B2E0524932F50198FCF 108020~|~1~|~2~|~02/SAF~|~Replace Loop Detectors with Radar Detection at:MED-303 & Stony Hill Rd~|~21 - Safety~|~48A5A7E4F8CCB303664D0755A74345E26EACEDD6 98573~|~1~|~3~|~03/S<2~|~Federal/State Urbanized Area Outside Corp. Limit (Paving Items Etc?): ASD-SR60 ? SLM 16.23 to 16.31(LT) SLM 16.38 to 16.51(LT)~|~05 - 4R Maintenance - Resurfacing~|~853719145784A5FA5D7E784CD489E3F47662F59D 98573~|~1~|~1~|~01/S<2~|~Federal/Local Urbanized Area Inside Corp. Limit (Paving Items):ASD-SR60 ? SLM 16.23 to 16.31(RT) SLM 16.31 to 16.38 SLM 16.38 to 16.51(RT) SLM 16.51 to 19.70ASD-SR96 ? SLM 05.60 to 06.89ASD-SR42 ? SLM 03.63 to 03.80~|~05 - 4R Maintenance - Resurfacing~|~9464A3BADAA5655AFE0185EFB392069C4A6B631D 98573~|~1~|~2~|~02/S<2~|~100% Local: Urbanized Area Inside Corp. Limit (100% City Items Such as Pavement Repairs, Etc?):ASD-SR60 ? SLM 16.23 to 16.31(RT) SLM 16.31 to 16.38 SLM 16.38 to 16.51(RT) SLM 16.51 to 19.70ASD-SR96 ? SLM 05.60 to 06.89ASD-SR42 ? SLM 03.63 to 03.80~|~05 - 4R Maintenance - Resurfacing~|~4AC9B54DF5FD6ECFF1EB8521B60BA59D28DE819F 98573~|~1~|~4~|~04/S<2~|~ASD-SR-60 16.850 SFN: 0301574 (over Jamison Creek)Preventive MaintenanceItem 512 ? Treating Concrete Bridge DecksItem 516 ? Expansion Joint Repair Minor RehabilitationApproach slab replacement/repair~|~13 - Bridge Rehabilitation~|~77DEC8275B0C1378754A643C1BA566EAED47D751 105560~|~1~|~1~|~01/STR~|~Pavement Marking~|~21 - Safety~|~74DF0900BB90485AB2568E15D6EBFDAD132E9CB6 105560~|~1~|~2~|~02/STR~|~Install 4.3 miles of edge line and centerline rumble stripes on ASD-60 from 11.71 (US 30) to 16.03 (City of Ashland) but no rumble stripes from 15.19 to 15.27~|~21 - Safety~|~C96B96601858420630EE9629F999DF4AB9145878 113293~|~1~|~1~|~01/SAF~|~Columbus Pedestrian Safety Improvement Program~|~21 - Safety~|~9F2346B9362A7DF184617FDD904149B595777765 82976~|~1~|~3~|~03/IMS~|~Correction of the existing superelevation on 4 existing curves for mainline travel.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~93203B90D853EF0BC100281E583AA1723F625D63 82976~|~1~|~2~|~02/IMS~|~Overlay and misc bridge work to bridges including HAM-74-0979 (SFN 3108414), HAM-275-1070 (SFN 3116298), HAM-275-1080 L/R/S (SFNs 3116344/3116352/3116387), HAM-275-1290 (SFN 3116425), HAM-275-1345 (SFN 3116468), and HAM-275-1426 (SFN 3116565).~|~13 - Bridge Rehabilitation~|~9BE1479A33174FD79BBA3F3588EFBE167CB7AC7D 82976~|~1~|~1~|~01/IMS~|~Major Rehabilitation on a portion of IR 275 in Hamilton County from the overlap section with I-74 (SLM 10.57) to approximately milepost 34 (SLM 16.12). Includes all mainline pavement and ramps within the project limits.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F3B7E9F8A8EB352C2837252ABECC7E9B963DC2F5 108710~|~1~|~1~|~01/S<2~|~Landslide repair, ER Event OH18-01, DSR# BEL-026.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~48602DE4A317B1546102557D7B5A28A6A19031B0 108710~|~1~|~2~|~02/S<2~|~Landslide Repair, ER Event OH18-01, DSR# BEL-027.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~496F68B58720D03C154C71B4A2248B568F5FE410 114306~|~1~|~1~|~01/NFP~|~Plan Split "01/NFP" - 4PS7 (100%) - district wide spot pavement repair.~|~05 - 4R Maintenance - Resurfacing~|~B6F431CE4A5BEA750C6432F20724DCB4B7A3E1AA 119936~|~1~|~1~|~01/SAF~|~Safety Items~|~28 - Facilities for Pedestrians & Bicycles~|~DD3B637373EB60CE4ADB175903AC3F708118642D 113830~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~44 - Other~|~602B510A1173C911B6C8416819E01B10B3EB197E 95864~|~1~|~1~|~01/NFP~|~@ SLM 15.74~|~04 - Reconstruction - No Added Capacity~|~F5EF158AC2929D0EB35871E7E797CA092C022ED4 92812~|~1~|~1~|~01/IMS~|~Maintenance and upkeep of the existing landscaping at the IR70/IR75 interchange in Montgomery County~|~31 - Landscaping & Other Scenic Beautification~|~DA5EB056E389D4EC5EBFA6DC472C49BD24E8607C 96075~|~1~|~1~|~01/S<2~|~Bridge rehabilitation on FAI-SR 256-5.88 SFN 2303124~|~13 - Bridge Rehabilitation~|~43B4BB132BA18C201AB286A5C25ADD7C1A3A92D4 99449~|~1~|~1~|~01/NFP~|~Spot pavement repairs on assorted routes in POR,STA, SUM counties in District 4.~|~05 - 4R Maintenance - Resurfacing~|~F29E9A50DCA3AC104BF2881E1AF381A176E0E993 112554~|~1~|~2~|~02/S5K~|~Resurfacing on the Urban section~|~05 - 4R Maintenance - Resurfacing~|~5D80D05984C4D8ADC0EE87881C7E8848412AA445 112554~|~1~|~1~|~01/STR~|~Resurfacing and bridge work for the Rural portion~|~05 - 4R Maintenance - Resurfacing~|~5427CA85DCEBA1AF21B382E2C484A66542E4582C 123793~|~1~|~1~|~01/STR~|~stp rural~|~05 - 4R Maintenance - Resurfacing~|~549BC67A0AD3D6BF7F3FDB8891EAEEB6033D05F3 93580~|~1~|~1~|~01/STR/FRED~|~- Village of Fredericktown SRTS project. 4SC7 (80% Federal) / 4BG7 (20% Local converted with TRC) - CAP $388,946.61 ($500,000.00 minus $106,084.03 {PE} & minus $4,969.36 {RW}) Sidewalks around the school and along Village Streets. The Village of Frederickstown will be responsible for costs above the CAP.~|~28 - Facilities for Pedestrians & Bicycles~|~1FD0D3E47DEA9C49AEEB1F68A3BBEE9A8CE0168D 114672~|~1~|~1~|~01/S>2~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~4F84670172967577C504C059DEE944460C88C648 114672~|~2~|~2~|~02/STR~|~conduit linked~|~04 - Reconstruction - No Added Capacity~|~0A0A369D95CD2CFFD94D03815372B23C0553EBC8 103760~|~1~|~1~|~01/STR~|~Bridge deck replacement for MEG 124 5589, SFN 5301831.~|~13 - Bridge Rehabilitation~|~4D4C5B776C50B3B6817289D155E0258E1F126815 98702~|~1~|~1~|~01/MPO~|~Resurfacing Olde Eight Rd from Boston Mills Rd to Boston Heights North Corp limit.~|~05 - 4R Maintenance - Resurfacing~|~3F96D5F6F0EEFDC9FC89F8CEF15C07B51F7CB540 98702~|~1~|~2~|~02/IMS~|~Micro-surfacing of SUM IR77 (SLM 19.51 to SLM 21.99) and SUM IR271 (SLM 0.00 to SLM 2.33), in Summit County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~FE18ED618CA8F735E751ACF42865DEB602FB4E9C 77371~|~1~|~2~|~02/NHS~|~Tentative split for NH/added capacity portion of FRA-71 reconstruction~|~17 - Construction Engineering~|~3EAED5DC1408E5722BB1F8AD413E58E4CA75610E 77371~|~1~|~1~|~01/IMS~|~Tentative split for IM portion of FRA-71 reconstruction~|~04 - Reconstruction - No Added Capacity~|~AC1CB033FF8B37D3CD594CCF40FCE678DB6A327F 77371~|~1~|~4~|~04/ENH~|~Tentative split for ODOT funding of aesthetic items~|~31 - Landscaping & Other Scenic Beautification~|~3C372C5B07C1E86ED61EE295C7E2BDAC3486D0EE 77371~|~1~|~5~|~05/MPO~|~Tentative split for MORPC/Columbus funding for added bridge width for aesthetics~|~08 - Bridge - New Construction~|~D8AFC71CE369C7D309B962BB38F8E74A16895683 77371~|~1~|~3~|~03/IMS~|~Tentative split for bridge replacements~|~10 - Bridge Replacement~|~79F03C83378D441F2E0356C1A449834B0381E118 96538~|~1~|~1~|~01/IMS~|~Plan split for microsurfacing on WAR-75~|~05 - 4R Maintenance - Resurfacing~|~B640E60368816496E39B05D0CE974F556993820B 116667~|~1~|~1~|~01/STR~|~Place Holder plan split until location is selected~|~44 - Other~|~102D482E13565BDFF1BFF6856E323115DBDB11CB 112461~|~1~|~1~|~01/NHS~|~Pave culvert invert. ATH 50 38.09 (CFN 1880452) and 38.77 (CFN 1880453). NHS route funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~81119DF64713C163FD9E6440310867F630DC0E68 83946~|~1~|~2~|~02/STR~|~Pavement Markers needed for the project.~|~05 - 4R Maintenance - Resurfacing~|~34EAB6CC93E291C271626F5C0D56EFAD1FF5A254 83946~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items on US 127 from the South Corporation Limit of Castine, (SLM 0.76) to the Junction of US 36 (SLM 9.57). Also resurfacing of West Street SR 185 within the village of Versailles from SLM5.29 to 5.45.~|~05 - 4R Maintenance - Resurfacing~|~705FCF507FEAEFF3C2C677A86FA33A91DA82AC1B 118120~|~1~|~1~|~01/MPO~|~MPO STBG funds~|~05 - 4R Maintenance - Resurfacing~|~40BC68915804D6EC9676503483E5AAC136B9D18F 118120~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope item: asphalt rejuvenating agent.~|~05 - 4R Maintenance - Resurfacing~|~CE93781A5F23AB2F131B76638A51E068D77687E1 92386~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1602527 COS SR541 29.18 Intersect: Trib Of Bacon Run; Not BR Eligible for Replacement: Length=31 SD/FO(0) SR=68.6 DSR=5~|~10 - Bridge Replacement~|~A48AEE793A7F10BDBE88365AD72110B9926A7C46 98823~|~1~|~1~|~01/IMS~|~Emergency Type C repair for steel straightening on MOT-675-0647 Bridge (Bigger Road over IR 675)~|~44 - Other~|~0DA121FAD9AB86903E101729EFE6214C074743E7 111331~|~1~|~1~|~01/NFP~|~ODNR project to resurface R-6 and R-8 in Burr Oak State Park. Funded 100% State ODNR.~|~05 - 4R Maintenance - Resurfacing~|~FE013323DEF29D5214D2DB08D7B4F75D0E510494 102509~|~1~|~1~|~01/IMS~|~Install new signal at I-77NB & Shuffel St, replace traffic signal at SR-44 & Columbus Rd, replace overhead flasher at SR 619 & McCallum Ave.~|~21 - Safety~|~E5C1BC8CDB8A2D83A9E709BE7760063983B5FE86 105370~|~1~|~1~|~01/STR~|~Chip seal on rural route: MER SR 117 SLM 0.00 to 2.09~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~245D69C98CF3B9DCC37B1BCE69F5D0F8F4C5F6AE 108756~|~1~|~1~|~01/S<2~|~Culvert replacement on Bellefontaine Ave over Jones Ditch~|~04 - Reconstruction - No Added Capacity~|~F686975116BBD27BEDAD2A0E3850401287CDF697 104266~|~1~|~1~|~01/SAF~|~Upgrading guardrail and end terminals on various county routes throughout Trumbull County.~|~21 - Safety~|~EE472063AEE98A431B5762AC82CBFD27E4661BBE 102341~|~1~|~1~|~01/S<2~|~Microsurfacing US 62 from SR 165 to SLM 5.44, and from SLM 10.02 (TR 151) to SR 45.~|~05 - 4R Maintenance - Resurfacing~|~188ADE2E1A61ABE8EBDD02DA7FD490D18C3CCB5D 102341~|~1~|~2~|~02/STR~|~Microsurfacing US 62 from SLM 5.44 to 10.02 (TR 151).~|~05 - 4R Maintenance - Resurfacing~|~F1BABCB88E65E3E97FB7FECB907D54AF9389D489 96757~|~1~|~1~|~01/S5K~|~SAN-6 from SLM 18.98 to 19.945~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~2C60440C66921754BD0BA124FA4B974EFA480D61 96757~|~1~|~2~|~02/STR~|~SAN-6 from SLM 19.945 to 23.49~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~8DF060B129649A4E54AA30D00CCE55CBC505DB15 24948~|~1~|~1~|~01/NHS~|~Patch and place RCP to Bridge No. HAM-125-0378, (SFN 3111318). Bridge spans tributary of Clough Pike.~|~13 - Bridge Rehabilitation~|~FE709D5AF8EE65703C9137057310C95E72A49167 108027~|~1~|~1~|~01/NFP~|~Cracksealing~|~44 - Other~|~C18FBE8238275A54FA0A76D7C4A37231D4535D1C 86936~|~1~|~3~|~03/S>2/CANT~|~Resurfacing of State Route 627 from SLM 3.35 to SLM 3.88 and SLM 3.99 to SLM 4.55, in the City of Canton, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~742B55891E698E34EE7B985A3592CF59FB8B0703 86936~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation of SFN# 7606524, STA SR-627-4.48 over IR-77.~|~13 - Bridge Rehabilitation~|~7907F786F57D513E8C37BDB6590C5D62B7DEC557 86936~|~1~|~2~|~02/S>2~|~Plan split for the resurfacing of STA SR-627 from SLM 0.15 to SLM 3.35 and SLM 3.88 to SLM 3.99, in Perry Township and Canton Townships, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~8AA6499C85DD1A8463909C9EA28416AEAC66780A 86936~|~1~|~4~|~04/S>2/CANT~|~100% City of Canton items, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~94AFB1AD4E7B2145CB63EEFCD538206797463CDF 110421~|~1~|~1~|~01/IMS~|~01/IMS/PV/ - Plan Split 1~|~05 - 4R Maintenance - Resurfacing~|~D661B962F695F6C4009D2CB98748D42BB9B415E0 110421~|~1~|~2~|~02/STR~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~1440D63361BAE9E2245F5FA4B8F81E3ABE2E4170 97383~|~1~|~2~|~02/NHS~|~Concrete deck overlay MEG 7 0471, SFN 5300096. Also includes substructure work. NHS route funded 80 federal/20 state.~|~~|~04F1A7118B790B226E69371FA469B2C8969C2F65 97383~|~1~|~1~|~01/NHS~|~Corridor rehab on MEG 7 4.65-5.80. Work includes signal installation and the addition of left turn lanes.~|~21 - Safety~|~30F76140B37A0AB05DEF66430B34D422DB2750E3 112193~|~1~|~1~|~01/NFP~|~Districtwide pavement marking work order.~|~~|~914EC76B730C9257B0E2C741D4803887BCA0CA61 89054~|~1~|~1~|~01/NHS~|~From Bridge No. HAM-71-0181, the Pedestrian overpass over I-71/I-471to Bridge No. HAM-71-0226, Elsinore Pl. Overpass This is Construction Contract (CC) OH-1A of the Brent Spence Bridge Project. The purpose of this project is to restore I-71 and I-471 to their original lane configurations at the completion of the Brent Spence I-75 construction. Temporay configuration will be constructed under CC OH-1, PID 89053.~|~~|~85BC8CCC17BCB9730C5AC35F4D8935922504CB49 117992~|~1~|~1~|~01/BRO~|~Bridge replacement. All work is included in this split. ~|~10 - Bridge Replacement~|~A9545F5AA02E74B7CB2E7F5519E6BD37AE38F02D 100957~|~1~|~1~|~01/NHS~|~Resurfacing of POR SR 5 from 0.55 to 0.94 and 1.30 to 5.09, POR SR 44 from 11.77 to 12.08.~|~05 - 4R Maintenance - Resurfacing~|~ACEF42F1EC3B50641A65DD9DD856D0C21C60F4C5 100957~|~1~|~3~|~03/STR~|~Resurfacing of POR SR 44 from 15.03 to 16.48.~|~05 - 4R Maintenance - Resurfacing~|~E4E8E844922E96D6F25E19B765FDA5E9AF1C052E 100957~|~1~|~2~|~02/S>2~|~Resurfacing of POR SR 44C from 0.00 to 0.36.~|~05 - 4R Maintenance - Resurfacing~|~F62BDFFF744360F8F906BF6FC7EC3052BBA0C48A 100957~|~1~|~4~|~04/SAE~|~Adding rumble stripes.~|~21 - Safety~|~53039C73CB5E72DE218CE60E768198B53566CDC8 85102~|~1~|~2~|~02/STR~|~Resurface portions of SR 503 in Preble County with pavement repair; from SLM 12.01 - 19.82 and SLM 20.86 - 25.19 ~|~05 - 4R Maintenance - Resurfacing~|~839103D937E06B063F1787E821AE842D9652CC42 85102~|~1~|~1~|~01/STR~|~Rehabilitate bridge PRE-503-1557 (SFN 6803814) by replacing the continuous concrete slab and other minor bridge work. Seal decks of other bridges (SFN 6803725, 6803873, 6803911, 6803938 & 6803997)~|~13 - Bridge Rehabilitation~|~AAA7BB415D9D62F43F9A47F58B9E07DE8A4D348E 89138~|~1~|~1~|~01/NFA~|~PIK CR47 0.48 Brdg Replacement In Pike county, on CR 47, 0.48 miles from SR 104 Project Description: It is proposed to replace structure (SFN 6631142) at 0.48 over Prussia Run. There is also CSTP funding allocated to rehabiliation of roadway on Denver Road. Per CEAO letter, 8/3/10, FED Max for LBR is $1,052,920; FED Max for CSTP is $378,400. CEAO 80 Fed/20 Local Match by Pike County 01/NFA/BR/Pike~|~10 - Bridge Replacement~|~CC32AF8C7E74C3D162C631240722D767842D5CF2 103961~|~1~|~1~|~01/STR~|~MAR-95-22.64 Replace deck overlay, paint structural steel, minor repairs~|~13 - Bridge Rehabilitation~|~7C560EB1B22D60EE9F530A11189159FDB14E16B2 107330~|~1~|~1~|~01/SAE~|~Plan Split~|~21 - Safety~|~1DE9D247248FDC0C38B7B502D7BC085C42EBB744 83122~|~1~|~1~|~01/BRF~|~Remove and replace an existing 2 span, 67' bridge over the Miami and Erie Canal, SFN 0660272 MAUGMR **C 0.00. Remove an existing 27" Bridge over the Upper Mill Race of the Miami & Erie Canal, and replace with a 66" culvert pipe, SFN 0660329 MAUGMR **C 0.00.~|~10 - Bridge Replacement~|~8A40B7C6C3E7E9C1E2F5975B0735689BB3A9C3D3 101111~|~1~|~2~|~02/S>2~|~plan split for the large urban sections on BUT-129~|~05 - 4R Maintenance - Resurfacing~|~173FA502AA02DA3914376265A202F25903884F4B 101111~|~1~|~1~|~01/NHS~|~plan split for the NHS portions on BUT US 27~|~05 - 4R Maintenance - Resurfacing~|~E25CD29EF45F02BBB98097E87DF9F69973E54E5D 101111~|~1~|~3~|~03/STR~|~Plan Split for edge replacements on BUT-27~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AAC4E593B2DEA30732CEE601D7FDCAF523CA6231 111629~|~1~|~1~|~01/NFP~|~Loop detector maintenance.~|~21 - Safety~|~741F2E82AA99E091D7DD6F330D2439EF881A03F7 101643~|~1~|~1~|~01/BRO~|~District Preservation 4PF7(80% Federal) / 7BPB-4PS7(20% State) - CAP (See Comments) - Rehabilitation of 3004058 Gue SR209 08.56 Intersect: Wills Creek & CSX RR: BR Eligible: Length=848 SD/FO(0) SR=58.7 DSR=4~|~17 - Construction Engineering~|~520A494C8112ED79E09B0A689C96D891EA437023 101643~|~1~|~2~|~02/ENH~|~Local Funding - 4BG7 (100% Local) - No CAP - Repair of steps near GUE-209-8.56 bridge.~|~17 - Construction Engineering~|~50567BDFD0C2A6F8656E09192FDF4EA3A68A545F 115795~|~1~|~1~|~01/S>2~|~Resurface existing roadway, widen shoulders, and install concrete barriers, tree lawns and bike paths. Upgrade signal at Dixie/Northwoods. Construct roundabout at Dixie/Lightner. Replace bridge on Dixie.~|~04 - Reconstruction - No Added Capacity~|~4C120AD14136B151CB5CF11C885943C25B23B469 122726~|~1~|~1~|~01/S>2~|~Plan Split for MPO STBG funded scope~|~04 - Reconstruction - No Added Capacity~|~48916AFD9EBA7B8694F6A2A23783CA1E81554CA0 122726~|~1~|~3~|~03/NFP~|~Funding split for locally funded scope, such as water line replacement~|~17 - Construction Engineering~|~3A1BC55EE8F019B1B6F1DD98E1DA63034EA75B72 122726~|~1~|~2~|~02/ENH~|~TMACOG TAP Funding for SUP between Monroe and Bancroft~|~28 - Facilities for Pedestrians & Bicycles~|~CC7B6986B3E87ABDB6A0F17EED0FF498BC729A92 93970~|~1~|~1~|~01/SAF~|~D09 District Pavement Long Line Markings (B)~|~21 - Safety~|~2A62F35DE4F6A751843FA199838AF4F40738FA4A 120566~|~1~|~1~|~01/ENH~|~TAP funding 4B37 80% & 4HJ7 20%~|~28 - Facilities for Pedestrians & Bicycles~|~4B9C1EBE6008B4081CC150EC450F5D533F4A9772 120566~|~1~|~2~|~02/ENH~|~District Preservation funding event at 80/20 4PF7/4PS7 ~|~05 - 4R Maintenance - Resurfacing~|~19C8F214566617266343CC73DF5D54A276ABB0A3 97667~|~1~|~1~|~01/NHS~|~Pavement planing and resurfacing of the existing pavement SR 725 SLM 19.75 to SLM 22.31 within the City of Centerville.~|~05 - 4R Maintenance - Resurfacing~|~5964C82BAAA8C8D95AFCC12524F4A0E49F4E8F5C 96681~|~1~|~1~|~01/NFP~|~FY 2019 Pavement Preventive Maintenance on various Routes in ATB, MAH and TRU Counties.~|~05 - 4R Maintenance - Resurfacing~|~E56CD190507FA743086C9998E20783351C1A10E6 126352~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~B6D76AF24AE219EC1F2EFC11AB0D26BDE35B35AC 101390~|~1~|~1~|~01/STR~|~HUR-SR-61 6.700 to 12.080 60-AC Overlay w/Rpr HUR-SR-162 19.980 to 23.640 60-AC Overlay w/Rpr HUR-SR-162 24.970 to 29.020 60-AC Overlay w/Rpr ~|~05 - 4R Maintenance - Resurfacing~|~9F5BAA876879622A14193CB344AC7D5C2F3B8C81 101390~|~1~|~2~|~02/SAF~|~Centerline rumble stripes on HUR-61-6.70-12.08 ~|~21 - Safety~|~ACD431010C3624213571206DF874530F0B6BB2F6 101060~|~1~|~1~|~01/S>2~|~Fine graded polymer AC overlay to POR SR 44 14.90 to 15.00.~|~~|~CE0F5B4324F60DABD061B429AA2A1941EE121A6A 101060~|~1~|~2~|~02/STR~|~Fine graded polymer AC overlay to POR SR 44 15.00 to 16.48.~|~~|~CE9D53CB02A611D63081CFFD8799EE5D1BD82AA7 117657~|~1~|~1~|~01/NHS/PATA~|~Construction of sidewalks and signal upgrade along SR 16 (Broad Street) in Pataskala.~|~21 - Safety~|~8657373AE139282807243ACFFE8778B7696D1897 91155~|~1~|~1~|~01/SAF~|~Herbicidal spraying project, District wide on various routes and sections. 100% State.~|~44 - Other~|~CB916337F157A47323E7E855A334BF177495BAEE 90953~|~1~|~1~|~01/SAE~|~The split uses Safe Routes to School funding and is eligible for 100% federal funding.~|~28 - Facilities for Pedestrians & Bicycles~|~33710E5EDB6D984D05A2C508EE9A69967DDD1878 109830~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout POR, STA and SUM counties.~|~21 - Safety~|~80D4923D070CBE215A3D0D245C0114E1DBC35295 87233~|~1~|~1~|~01/STR~|~ADA SR125 0.00 - 8.44 Resurfacing ProjectOn SR125, beginning at the Brown County line (SLM 0.00) east to its intersection with SR41 (SLM 8.44) it is proposed to resurface the highway with aspahalt concrete.Brdgs that are pave thru:0102857 ADA SR125 0.41 Intersect: Sacremento Run0102881 ADA SR125 0.48 Intersect: Kirker Hollow Stream0102911 ADA SR125 1.33 Intersect: Spock Run0102954 ADA SR125 1.41 Intersect: Aids Run0103039 ADA SR125 6.33 Intersect: Humboldt Creek80/20 split01/STR/PV/State~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1DA8812DCC25DB9E91B9F3CB95C322C22317E6CF 87233~|~1~|~2~|~02/STR~|~ADA SR125 0.00 - 8.44 Resurfacing ProjectBrdgs F/Rehab0103004 ADA SR125 3.03 Intersect: Hills Fork Of Eagle Creek0103063 ADA SR125 6.52 Intersect: East Fork Of Eagle Creek80/20 split02/STR/BR/State~|~13 - Bridge Rehabilitation~|~A5E6EF90E6EEAB9BC1399C70E4E8753333EBDEC9 98079~|~1~|~1~|~01/SAE~|~Restripe the crosswalks at the intersections of Broadway with Main Street, Mulberry Street, and Silver Street; Install LED countdown ped heads at the intersection of Broadway and Mulberry Street; Install a new crosswalk with a push button activated LED ped crossing sign across Main Street at Mechanic Street.~|~21 - Safety~|~8A9434C47AF67AA0DE356819EF05AEDAFC950446 101330~|~1~|~1~|~01/STR~|~Bridge replacement.~|~10 - Bridge Replacement~|~0F59C65C26C7014855D46E2CB55F68D391317A69 119335~|~1~|~1~|~01/STR~|~Resurfacing.~|~~|~87DE4FE9B96B9A936F29E877F10498E7EDA59B6E 111117~|~1~|~1~|~01/S5K~|~Bridge replacement project. HOC 278 5.47 (SFN 3710002). Urban other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~677D41F2BEF0EF867093EF0BEAB7D39A0265F4CF 98675~|~1~|~1~|~01/NFA~|~Widen pavement, shoulders & clear zones, resurface, superelevate, improve intersection geometrics. CR 21 B 0.60-2.00~|~~|~259FC76E6B27E857252DF288B7A2D47BDABFB514 125168~|~1~|~1~|~01/NFA~|~Placeholder~|~44 - Other~|~4C910D6CAA070FD5D96BC7CB2F3F29AD8EC2139A 98034~|~1~|~1~|~01/NFA~|~District Preservation Pavement Program - 7BPB (100% Bond or 4PS7(100% State) - See CAP Comment - Resurfacing of Cos/Hol-SR 206-3.85/0.00~|~05 - 4R Maintenance - Resurfacing~|~754B0AC0CE27CB5D2C320A00FB2D496B021ED3C0 107790~|~1~|~1~|~01/STR~|~created plan split~|~13 - Bridge Rehabilitation~|~9F5F301CA6DBA9951CA71932069D404691C8C662 98364~|~1~|~1~|~01/MPO~|~Resurfacing of Hopocan Road from 8th St NW to Wooster Ave in the City of Barberton. Includes milling, resurfacing, striping and some partial and full depth repairs.~|~05 - 4R Maintenance - Resurfacing~|~F472C26B099680C43BE519C9F2933356DA188504 96669~|~1~|~1~|~01/IMS~|~Apply pavement markings~|~44 - Other~|~9F0277DC9EAC94480E7FF782A393032826DEDF7E 94222~|~1~|~1~|~01/NFP~|~District wide maintenance contract for highway lighting in D08 for FY2018.~|~~|~781E22581E7FD8994C813B61A30A2FE7281CE1A8 97966~|~1~|~1~|~01/S>2~|~SR 41 SLM 9.51 to SLM 11.19 (OM 038) - Resurface the existing roadway with 1.75" thick asphalt mill and fill.~|~05 - 4R Maintenance - Resurfacing~|~9C083A151EF28F2E5DC4B11266D339120EB55002 125015~|~1~|~1~|~01/S>2~|~ODNR park resurfacing~|~05 - 4R Maintenance - Resurfacing~|~DDF1EFB68C974642E1626CECCF833328DD3523EE 109483~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~0FE6BA3337E81E1C2CE060C8CD391BC99BC23F8B 111371~|~1~|~1~|~01/MPO~|~MPO Funded item split~|~17 - Construction Engineering~|~B16B3CE830A53A6EF3EF7833E57FE6AF772BBCFB 116464~|~1~|~1~|~01/ENH/AKRO~|~Construction of a multiuse trail in the City of Akron.~|~28 - Facilities for Pedestrians & Bicycles~|~66B78B02D6C8DFD81B1457CF849E5EA4335D1161 104649~|~1~|~1~|~01/SAE~|~01/SAE/OT/ For traffic signals on the NHS System. Funding is 100% federal funds since signal construction is eligible for 100% safety funds.~|~21 - Safety~|~816D3D4F003093CBE5FBA194BAF836CCE10F4A9F 104862~|~1~|~1~|~01/STR~|~Replace and rebuild existing guardrail. WAS CR 25 1.55-7.71. Rural other federal aid funded 80 federal/20 local.~|~21 - Safety~|~05DF5D9471D49D645FE0CF3C04CEE50E9FFFE7C9 101352~|~1~|~1~|~01/NHS~|~AC overlay with repairs to TRU SR 45 from 10.64 to 11.17, AC overlay without repairs to TRU SR 45 from 11.17 to 11.71.~|~~|~4E0DB93EDED333881615F2AA1C0D0EF4809CE789 107288~|~1~|~1~|~01/S>2~|~Split for paving work~|~05 - 4R Maintenance - Resurfacing~|~DCEAD8EEDFD860C2F1573D9C9AA216C35CF56A9C 107288~|~1~|~2~|~02/NFP~|~Plan Split for non-eligible federal funded work at 100% local cost.~|~05 - 4R Maintenance - Resurfacing~|~FD1B71CAA5AD793ED9C1ABCCC17D53E608D199D3 107288~|~1~|~3~|~03/SAF~|~Pedestrian improvements at Mastick Road using safety funds. ~|~05 - 4R Maintenance - Resurfacing~|~568B27C825FA8FB1D200B50E804B40F836ACCB4F 98151~|~1~|~2~|~02/S<2~|~HIG 138 13.06 - 14.97~|~05 - 4R Maintenance - Resurfacing~|~569FCB3C7D94B49220113F0A7966880CDEB32A19 98151~|~1~|~1~|~01/STR~|~HIG 138 7.03 - 13.06~|~05 - 4R Maintenance - Resurfacing~|~9076FB1111353365283EA5DF3491CA310E66F04F 98151~|~1~|~3~|~03/S<2~|~HIG 138 (14.35-14.97) 80/20 Federal/Local~|~05 - 4R Maintenance - Resurfacing~|~F66B88E748E036C1C73FAE8E628A609698245B51 98151~|~1~|~4~|~04/S<2~|~HIG 138 13.67 (SFN 3603067)~|~05 - 4R Maintenance - Resurfacing~|~12F8B4D57568DAEC2B17EC1A1375A8F2047B48A5 88336~|~1~|~1~|~01/BRF~|~Bridge replacement~|~10 - Bridge Replacement~|~6D97E3BA8313936BDDD60E34BF7C55FAFBB1444D 127187~|~1~|~1~|~01/IMS~|~Plan split for all overlay work on WOO-475-0032R~|~47 - Bridge Preventive Maintenance~|~B884FBF322BBCFE3C5BB5F2BFB00878E49BD1353 120144~|~1~|~1~|~01/MPO~|~Installation of electric Vehicle Charging infrastructure at the Green Township Government Complex and Veterans Park~|~44 - Other~|~887A5AFC2290D2F8A61F34B6B34D8755BF591794 99466~|~1~|~2~|~02/IMS/KY~|~Retrofit by replacement of 3 Dynamic Message Signs (DMS), within Kentucky to be compatable with the statewide traffic management center.~|~44 - Other~|~0709CF4ED8A51BF728A1554CB7696AF6E3971574 99466~|~1~|~1~|~01/IMS~|~Retrofit by replacement of 7 Dynamic Message Signs (DMS), within Ohio to be compatable with the statewide traffic management center.~|~44 - Other~|~B8D10AA60942DC4D9C8FDB7B0D049EA961AAEB92 94901~|~1~|~1~|~01/IMS~|~Project will include deck overlay with SDC, conversion of the abutments to semi-integral, structural steel painting, and retrofitting the parapet. Bridge # SHE-75-1654, SFN 7502494 CR 52 Amsterdam Road over IR 75.~|~13 - Bridge Rehabilitation~|~D075312000A70441D46BB2EA2A9F568D9B088EF5 86654~|~1~|~1~|~01/S>2~|~Intersection improvement at the Clyo Road and Spring Valley Pike Intersection. Construct dedicated left turn lanes on each approach with traffic signal control. Additional left turn bays on the Northbound approach at Clyo/Country Corner Lane and on the Eastbound approach at Spring Run Lane/Spring Valley Pike, approach lanes are to be 12' and curb installed immediately at the intersection with paved shoulders. A culver will be widened.~|~04 - Reconstruction - No Added Capacity~|~A6640A560BE84C74F2396E454CC2F4D9635D0F77 118148~|~1~|~1~|~01/STR~|~Landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AA3008A8167BB6CC81FCB76FD97F5E4DC65547A1 109257~|~1~|~1~|~01/NFP~|~2 year lighting maintenance contract on various routes within POR, STA and SUM Counties.~|~21 - Safety~|~26109116C031D4B8E1CEBE812DB03B0E3B1C1BB2 109257~|~1~|~2~|~02/NFP~|~LED lighting upgrades.~|~21 - Safety~|~4CF6BBC698C822C55B85B1B2DDAADE19675A445A 84416~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. HOC 93 14.66-23.42. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~95BE0EABFAC70D43D3335281E3A7DC1963EFAF61 84416~|~1~|~2~|~02/S<2~|~Resurfacing project using an asphalt overlay treatment. HOC 93 13.08-13.85. Urban other federal aid funded 80 federal/20 local match.~|~05 - 4R Maintenance - Resurfacing~|~A992C79055830D3ADA6938746B6BB6B29138B684 84416~|~1~|~3~|~03/S<2~|~Resurfacing project using an asphalt overlay treatment. HOC 93 13.85-14.66. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~DC9632BE7547D221EB7BB014B49EA8F54BE2980A 114813~|~1~|~1~|~01/SAF~|~Convert the four lane section of SR 48 to a three lane section with a TWLTL. Add bus pull offs, on-street parking, curb extensions, and high visibility pedestrian crossings throughout the corridor. Twp segment.~|~21 - Safety~|~634A9BBAB22E89DF1A9C79A53EAFB5598C246445 114813~|~1~|~2~|~02/SAF~|~Convert the four lane section of SR 48 to a three lane section with a TWLTL. Add bus pull offs, on-street parking, curb extensions, and high visibility pedestrian crossings throughout the corridor. City of Dayton segment.~|~21 - Safety~|~78EF9D5AD47ED38DCAAC0D1E86E38431AF427E5D 84277~|~1~|~1~|~01/NFA~|~Replace existing twin CMPs at two locations (COL-558-0642, SFN 1505645 and COL-558-0980, SFN 1505793).~|~10 - Bridge Replacement~|~9A68E693ADFB3D1BB817C34316A2F6E5F02A48E2 115008~|~1~|~1~|~01/CMQ/BEAV~|~Widening of Kemp Road from Meadowcourt to Bluewing from 2 to 3 lanes. Addition of sidewalk to both sides of the roadway.~|~21 - Safety~|~255BD6A62D1CE34D3D5A876D5F352A94E3FF2A21 91036~|~1~|~1~|~01/MPO~|~Minor rehabilitation~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~09107F853C8889B9580953A11D77EECF869C983F 120592~|~1~|~2~|~02/NHS~|~All work on NHS bridges. 2 bridges total.~|~~|~6A4A50AFFFA07FB1654C57DC7EB39F8A2943BED5 120592~|~1~|~1~|~01/STR~|~All work on bridges classified on the Rural STP system and that are atleast 20 ft long. A total of 9 bridges in this split.~|~~|~63077764C989EFC6A02035F775D4BD1C5B8E352D 120592~|~1~|~3~|~03/NFA~|~All work on bridge 3301931 which does not meet the 20 ft length requirement to use federal funds. ~|~~|~138A9ABEFD129FA73DB039A6DE4C907F2B303BA1 94946~|~1~|~1~|~01/NFP~|~01/NFP/OT/ ; This split uses 100% 4MA7 funds. All work in this project is in this split.~|~~|~9112D5D5DABBCFD78FCE5E6E04AB9B84929311E2 83911~|~1~|~2~|~02/S>2~|~Approach work and replace reinforcing steel and other bridge work SFN 1201492~|~13 - Bridge Rehabilitation~|~541B445CE7EB3B982BE7390ABFA0EBBB3A2B87A4 83911~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items on State Route 41 from SLM 4.97 to 12.04 (segment length 7.07 total lane miles 14.14). From the North Corporation Limit of South Charleston SLM 4.97 to SLM 12.04.~|~05 - 4R Maintenance - Resurfacing~|~95BC59BC95845D8DF4D9FB508CC4AE35CD8A87CA 103690~|~1~|~1~|~01/SAF~|~Erect new guardrail and replace substandard guardrail on various county roads in Clinton County.~|~21 - Safety~|~9C9E3BCC43D87A6FEC6CEC87F5FC5C9FA2A6F934 115291~|~1~|~1~|~01/NHS~|~This plan split includes all work associated with constructing the shared use path within the project limits~|~28 - Facilities for Pedestrians & Bicycles~|~BA08B35ABD0AAC3E6FF1830E94D973C946A03085 114541~|~1~|~1~|~01/NHS~|~Resurfacing on the NHS sections~|~~|~5EFAA357F438F76EE53A1024BCB6C5B7FA7CED84 118856~|~1~|~1~|~01/NHS~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~B7D8B1E9878E1C42325BBA84778E70D6B6F6F7B4 121887~|~1~|~2~|~02/S5K~|~All sidewalk work along federal aid routes including SR 613 and CR 220. ~|~28 - Facilities for Pedestrians & Bicycles~|~1A2A5246D13BD72E604AB039DFA62CC9DBA7A71F 121887~|~1~|~1~|~01/NFA~|~All sidewalk work along local non federal aid routes within the village.~|~28 - Facilities for Pedestrians & Bicycles~|~2B1B83D7F9ACFD0F45A43FC786200C0A7C1216EB 87333~|~1~|~1~|~01/STR~|~3603245 HIG SR138 27.24 Intersect: Rattlesnake CreekDeck Repair/Replace80 Fed/20 State. 01/STR/BR/State~|~13 - Bridge Rehabilitation~|~E7514DF9A1FF10F1AD33EFAA76978E2CDF3E4F7C 91295~|~1~|~1~|~01/STR~|~Landslide repair. Includes FHWA ER funds and Fed/State GSM funds. Work includes landslide repair with a minor re-alignment. WAS SR 821 3.68-4.39. ER funds 80% Federal and 20% State Emergency funds.~|~07 - 4R Maintenance - Relocation~|~4E8A94C5C12E4667A1DF516A39A5CB1187FE3380 103975~|~1~|~1~|~01/STR~|~LAW SR 141 16.94 (SFN 4402618) bridge replacement.~|~10 - Bridge Replacement~|~CF1A211EBAA37FC01D0B7637D3A03EE35DEA5A30 93513~|~1~|~3~|~03/S<2~|~Rehabilitation of Northland Boulevard between Waycross Road and SR-4 including partial and full depth pavement repair, as needed, resurfacing, adjusting drainage structures to grade, replacement of deteriorated sidewalks and curbs, installation of new pavement markings, etc.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~26AFF1BCEFDBA279274B4DE4CD3BC8709CED7EE7 93513~|~1~|~1~|~01/ENH~|~Streetscape improvements including new identification signage via feature poles at key locations, vehicular directional signage, landscaping improvements within existing medians, up-lighting, installation of pavers within landscaped medians, addition of a METRO bus stop shelter, and installation of benches and trash receptacles. All improvements to take place within existing right of way~|~31 - Landscaping & Other Scenic Beautification~|~494C694DA7240FEEAA54482A7C4EB5C04076AFEE 93513~|~1~|~2~|~02/CMQ~|~New decorative mast-arm signals, master controller, contdown LED pedestrian signal heads, LED vehicular signal heads, ADA ramps, emergency vehicle pre-emption, uninterruptible power supply, fiber optic interconnect, installation of PTZ cameras for traffic management, illuminated street name signs, and video detection.~|~21 - Safety~|~BE192048D9470266E6845B6F1648B2CEE44D109B 79901~|~1~|~1~|~01/NHS~|~4801490 LUC SR25 5.04 Intersect: Delaware Creek~|~04 - Reconstruction - No Added Capacity~|~BC28D2C81E221507677464FCD862BE2DE710C49B 103429~|~1~|~1~|~01/NFP~|~Systematic Guardrail replacement/repair along various routes throughout District 4.~|~44 - Other~|~FE2F0A1456B94283B371494DEC74253BEF2EC7F0 111096~|~1~|~1~|~01/S<2~|~District Preservation Bridge Funding - 4PF7 (80% Federal) \ 4PS7 (20% State) - No CAP - Replacement of SFN 3000605.~|~10 - Bridge Replacement~|~4BAB6D86F2278838B1D7DB5BD31C8DC50D400DCC 100799~|~1~|~2~|~02/NHS~|~Rehab of BUT-129-1958 structure~|~13 - Bridge Rehabilitation~|~95FDAD578C6A572B96411D7CEB3D54C63841D631 100799~|~1~|~1~|~01/STR~|~Rehabilitate bridge size culvert at PRE-122-0205~|~13 - Bridge Rehabilitation~|~C927A1F045A50DEBB17FBE07D0C17837EBBBDBE2 100799~|~1~|~3~|~03/S5K~|~Plan split for all costa associated with BUT-122-0835 in Middletown.~|~13 - Bridge Rehabilitation~|~252210E6678A6C58B951296FB8032EDA05A4B958 110482~|~1~|~1~|~01/SAF~|~Safety funds Plan split~|~21 - Safety~|~F086248EF8A04717170A2E5B5B733DAC70B709CE 110482~|~1~|~2~|~02/SAF~|~District funded - Environmentally required landscaping along ditch~|~21 - Safety~|~9A115D282F667E1A04A079BBD0EEA82441D4169E 96105~|~1~|~1~|~01/NFP~|~Wash Bay~|~44 - Other~|~9543C1FE0C67FA0A18E7B364BDAEB0865C4B007B 121069~|~1~|~1~|~01/MPO/MOGA~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~F6619ECF4156A7E52A1CE243A55AB1D15E99AF52 95533~|~1~|~1~|~01/STR~|~BRO US68 resurfacingOn US68, begin (SLM 22.37) 2.09 miles north of Georgetown, north ghrough Mt. Orab to Mt. Orab corp limit (SLM 31.34), it is proposed to resurface the highway with asphalt concrete.Pave Thru:0801593 23.050801623 23.930801690 27.610801720 30.0980/20~|~05 - 4R Maintenance - Resurfacing~|~A78FA7F79DA4CD679B43ABF36E4543ABA6B025F9 95533~|~1~|~2~|~02/STR~|~Rehab0801658 25.590801763 30.72~|~13 - Bridge Rehabilitation~|~0D0BB1FBBEAA685A86040581773B8B73F2090EE2 95533~|~1~|~3~|~03/NHS~|~BRO 32 5.23 0801798~|~13 - Bridge Rehabilitation~|~0E6727B874B9FDA6A067E9EA146EB396626A55DE 84538~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. HOC 328 5.93-10.56. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~0363DAA8156F4CBC9E4A1B081170E37BE995CE0B 84538~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. HOC 328 10.56-11.23. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~6751D99AC070EFE4AE0722502CDA5AB361012F64 84538~|~1~|~3~|~03/NFA~|~Two-Lane resurfacing project using an asphalt overlay with repairs treatment. HOC 374 17.91-25.26. Not on any federal aid system funded 100% state.~|~05 - 4R Maintenance - Resurfacing~|~0773C03780751D1E6091F249125C50566375B3AF 112569~|~1~|~1~|~01/NFP~|~RPM plan split~|~21 - Safety~|~7EBD383FCBFF13A6078910E19943B183E4F74D99 96501~|~1~|~2~|~02/NHS/DOVE~|~NHS portion of project which is all SR 800 work; Wooster Ave from Front to Slingluff.~|~21 - Safety~|~27CF91E6EC33A880E0C6B4E177E876307EE28AF1 96501~|~1~|~1~|~01/S<2~|~Non-NHS portion of project which is all of Woster Ave north of Slingluff.~|~21 - Safety~|~6E70E34433D43DE81082F121155422B5CD5F6683 102113~|~1~|~1~|~01/SAF~|~Provide RRFB and necessary sidewalk and crosswalk work~|~~|~5AF01C8D70E02B2C99917F6F1C927746CB93AD52 87527~|~1~|~1~|~01/BRF~|~bridge replacement~|~10 - Bridge Replacement~|~E35436C8DAE47318A23B5324C6E94976F11FEA3F 123434~|~1~|~1~|~01/S5K~|~Rehabilitation of the Broad Street Bridge (SFN 2331659).~|~13 - Bridge Rehabilitation~|~47CE099F36F92982DBE8A8D3AFFEC228AFB36F6E 115786~|~1~|~1~|~01/SAF/CCEO~|~Reconstruction of Clarksville Road (CR 10) including widening pavement and shoulders, improving horizontal and vertical geometry, and removing fixed objects from the clear zone.~|~21 - Safety~|~41F0FFE6CD444F6B70537BF5B5CB14EF9C40C945 94879~|~1~|~1~|~01/SAF~|~Placement of a warning sign in both directions to aid in the safe crossing of SR 235. SLM 0.5771 to 05.899~|~~|~C0AF639B3F7C588F0C5AC041B7209F719F6F39DB 120930~|~1~|~1~|~01/NFP~|~Tree stump and pruning.~|~44 - Other~|~6FA9397021A90507E148D5A67EFC719E50782388 117305~|~1~|~1~|~01/NFA~|~Plan split for resurfacing of the road for the LaDue Lake boat launch.~|~05 - 4R Maintenance - Resurfacing~|~1DC7CA844EAA994C81D94C6E715700A8DDD23CF4 108672~|~1~|~1~|~01/S<2~|~Reconstruction with some widening of Union Street between SR 682 and Shaffer Street (0.00-0.94). 95% Federal (w/TRC) and 5% Local funded.~|~21 - Safety~|~D1AAE936FBCD4E8DAA0891B6A95043FC19836A80 108672~|~1~|~2~|~02/S<2~|~Construction of new access road. ARC funded. ~|~01 - New Construction~|~B66F930F023F95CFD629654B8502CCE7FBC6321B 110769~|~1~|~1~|~01/NHS~|~Landslide repair. MEG 7 18.70-18.72. 100% State ER funded.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~AE0C76B3218E3B883CD4C751D0BF2E982F167AA6 92001~|~1~|~1~|~01/NHS~|~Bridge repair. ATH 682 6.07 (SFN 0504920). NHS Structure. Work includes abutment repair, deck replacement, and approach slab work.~|~13 - Bridge Rehabilitation~|~9923AA34FEF156C1D9C34511AAB3BA968A8C39D5 100493~|~1~|~1~|~01/STR~|~HIG 247 (6.38-11.08)~|~05 - 4R Maintenance - Resurfacing~|~33E1A3772A2595DACE234899C61DF7F2A28EB259 100493~|~1~|~2~|~02/S<2~|~HIG 247 (11.08-11.74)~|~05 - 4R Maintenance - Resurfacing~|~4F2CC3D2D033A18033174CC113497570B7DBCA3D 123334~|~1~|~1~|~01/STR~|~NOB-INVASIVE SPECIES VEGETATION MANAGEMENT THROUGHOUT NOBLE COUNTY.~|~31 - Landscaping & Other Scenic Beautification~|~6C9AD231114A6B78E93583B78CB18066A31E7105 88984~|~1~|~1~|~01/STR~|~HIG SR138 0.00 - 7.03 resurfacing projectBegin project @ intersection of SRSR138/134. Brdg's to pave thru:3602974 HIG SR138 0.54 Intersect: Ruble Run3603016 HIG SR138 1.85 Intersect: Ruble Run80/20 split~|~05 - 4R Maintenance - Resurfacing~|~EE370EF83EAB8F7BDEF39FAF054DD64DA9C7AAE2 109757~|~1~|~1~|~01/MPO/HAM~|~Plan split 1 covers OKI funds awarded to the City of Hamilton to construct trail from existing trailhead on N. Gilmore Road to Bilstein Blvd.~|~28 - Facilities for Pedestrians & Bicycles~|~A86365AFE2B345EF5FBF64441303B0DF49999A76 109757~|~1~|~2~|~02/MPO~|~Split 2 is for OKI funds awarded to MetroParks of Butler County for construction of the shared use trail from Bilstein Blvd. to SR 4 Bypass where it ties into the existing M2M trail.~|~28 - Facilities for Pedestrians & Bicycles~|~3C03D904D791F95E0A605080B31097D348562724 115794~|~1~|~1~|~01/MPO~|~TLCI Intersection Improvement eligible work.~|~28 - Facilities for Pedestrians & Bicycles~|~170689A5B61ACB40F1765412F794B3F9A74C80AA 107409~|~1~|~1~|~01/BRO~|~District Preservation Bridge Program - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - BR Eligible - Rehabilitation of SFN 4502825 carrying US 62 over CSX Railroad~|~13 - Bridge Rehabilitation~|~6BAC332050C5A2D3B97CD19C7E639DCAA0D4CADA 116237~|~1~|~1~|~01/S<2~|~Overlay in ROS.~|~05 - 4R Maintenance - Resurfacing~|~1DCB4CDAF4FCED5CD7805F81234A22CCA36FDF6D 92824~|~1~|~1~|~01/SAE~|~Guardrail upgrade on various local county roads.~|~21 - Safety~|~B881163278BC5177C802BA7F4B7017CA36E5CA62 78343~|~1~|~2~|~02/SAF~|~80/20 fed/state funding split for all work using safety funds.~|~21 - Safety~|~9C4F6EB12E45E18DE371D33441F2DF9A46BF7493 78343~|~1~|~1~|~01/ERD~|~80/20 fed/state funding split using earmark funds.~|~21 - Safety~|~E84D2A42ABAEB0E40B85F195DDA9AFE02FADC58F 95126~|~1~|~1~|~01/NHS~|~ SFN 0602973, AUG 198-0860 - Rebuild right deck edge using anodes & patch abutment and top of backwall. Deck overlay using SDC.~|~13 - Bridge Rehabilitation~|~03279669A999AC007581829F2B5E5C0550DBC7E5 80912~|~1~|~2~|~02/BRO~|~Realign ramps at HOC US 33 and SR 664 interchange. HOC US 33 7.74-8.29 (Ramps). Includes SFN 3704599, treatments include widening structure, deck replacement and other super structure repairs. 80% Federal/20% State.~|~13 - Bridge Rehabilitation~|~592699B8C981FED10FCCB0DFB43B105B2256A1F4 80912~|~1~|~3~|~03/NHS~|~Realign ramps at HOC US 33 and SR 664 interchange. HOC US 33 7.74-8.29 (Ramps). NHS, Federal 80%/State 20%.~|~21 - Safety~|~8331102539A644A8CD8909A6AF27704294164B68 80912~|~1~|~1~|~01/SAF~|~Realign ramps at HOC US 33 and SR 664 interchange. HOC US 33 7.74-8.29 (Ramps). 80% Federal Safety funds and 20% State.~|~21 - Safety~|~B475BE4D1E7D81C3F6E722F60503FD703CE1D35F 125228~|~1~|~1~|~01/NHS~|~Installing a timber sub-deck as a bridge diapering effort.~|~17 - Construction Engineering~|~5AEDC58402769E1C482A4C8A5A9AB12528A905BF 110826~|~1~|~1~|~01/STR~|~landslide repair~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~37F01200B17EF1181F2079C4E0C2E4C78DDF9FF4 123760~|~1~|~1~|~01/IMS~|~Plan split for sign work on IR-280 in Lucas County~|~21 - Safety~|~A29937547E5E56BABCB5FA95C85F220CD0C03F96 111580~|~1~|~1~|~01/STR~|~CEAO funded items~|~05 - 4R Maintenance - Resurfacing~|~7F7F54B3F1BB5B5C8EC18B192E331FFD98DEFDAF 111580~|~1~|~2~|~02/NFP~|~Plan Split for 100% locally funded scope items, such as asphalt rejunator.~|~~|~B40422619AA4A034B86A675E3367729505EB2215 115160~|~1~|~1~|~01/IMS~|~Convert the existing Diamond Interchange at Wilmington Pike (CR-85) and IR-675 to a Diverging Diamond Interchange (DDI), including local roadway widening.~|~03 - Reconstruction - Added Capacity~|~F92A85E3EC476960186834FAFE3157D5FB05C969 123275~|~1~|~1~|~01/NFP~|~Culvert replacement/repairs.~|~04 - Reconstruction - No Added Capacity~|~498CB22E908FEB86B566A36CB74FCCC0209482B2 116853~|~1~|~1~|~01/CMQ/YOUN~|~Signal upgrades/replacements.~|~21 - Safety~|~2DB77B4787292C4050FDF38DA1DFA2A683760D72 94449~|~1~|~2~|~02/NHS~|~The funding is for design of two structures (COL-11-1777 L & R, SFN 1500872, 1500902) on SR 11 in COL county under the design-build contract. The scope involves superstructure replacement on both bridges and changing thge profile on the Left bridge to incerase vertical clearance on SR 517.~|~15 - Preliminary Engineering~|~35C96A3A1A97AFAA70F509E949BFC82F28612F20 94449~|~1~|~1~|~01/NHS~|~The project involves the replacement of the reinforced concrete deck for bridges COL-11-1777 L & R (SFNs 1500872, 1500902), painting structural steel and converting the abutments to semi-integral.~|~13 - Bridge Rehabilitation~|~530F4EB312B38E440E3BA2311C579D8C4D1ED484 94388~|~1~|~1~|~01/S>2~|~General System Resurfacing - Urbanized~|~05 - 4R Maintenance - Resurfacing~|~B7D3FA35455CB11AF82685F029D2FD5C24598EEB 94388~|~1~|~2~|~02/S>2/WADS~|~80/20 - 4PF7/4BG7 - City of Wadsworth Urban Paving~|~05 - 4R Maintenance - Resurfacing~|~349F842D3F79C77B8D233D0C441531A77473CE46 94388~|~1~|~3~|~03/S>2/WADS~|~100% City of Wadsworth~|~05 - 4R Maintenance - Resurfacing~|~70863199512E0719E6A819A8F020D57B8A56BF96 95937~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority~|~44 - Other~|~0566E9675A587E8F2BD38B4B206840E49C1DC10C 81724~|~1~|~1~|~01/NHS~|~priority system minor rehab. of COL-11-20.70 to 25.20; includes resurfacing with asphalt to address structural deficiencies, full depth repairs. guardrail, pavement marking~|~05 - 4R Maintenance - Resurfacing~|~EEF2B1A8EBC938D95E0FF6A2AAFD81474DE4FDD8 103691~|~1~|~1~|~01/SAE~|~Erect new and replace substandard guardrail on various county roads in Clinton County.~|~21 - Safety~|~33CC92F52E6D509430ADE3CDB5B44F271EC70F1A 98580~|~1~|~1~|~01/BRF/KCEO~|~"01/BRF/BR/KCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP - KNO-127-0.20 - SFN 4235568 - BR Eligible for replacement: L=95'; SD/FO=1; SR=49.3; DSR=4; over Dry Creek~|~10 - Bridge Replacement~|~30E8231B45973AFD1611BC44596F5C4A3677D9E7 120447~|~1~|~1~|~01/NFP~|~Established Plan Split - 01/NFP/OT/ 100% State (4PS7)~|~21 - Safety~|~715D153B23BFD9BB41AF8BEC15704992D3FB200B 105236~|~1~|~1~|~01/STR~|~Fine graded polymer AC overlay on rural routes: MER SR 197 SLM 3.37 to 6.33.~|~05 - 4R Maintenance - Resurfacing~|~6ED3A51C1EEAA5714A6F9991AD1BB03EF4D60786 105236~|~1~|~2~|~02/S<2~|~Fine graded polymer AC overlay on sm urban routes: MER SR 197 SLM 2.26 to 3.37.~|~05 - 4R Maintenance - Resurfacing~|~B14766F7FF5B9E429A5F9A469DBB0BC48155AE08 123670~|~1~|~1~|~01/STR~|~culvert split.~|~04 - Reconstruction - No Added Capacity~|~7AD04748DC16EDD2212EED39B6A6C8791FA1F1F0 112639~|~1~|~1~|~01/MPO~|~Resurfacing of Fifth Ave from the Southern Liberty Township Line to Goldie Rd in Liberty Township.~|~05 - 4R Maintenance - Resurfacing~|~0C995C5C643E92A4FAF1EF4D02C323726E592242 111324~|~1~|~1~|~01/S<2~|~Pavement project on CR 10 (East Broadway Street) in the City of Jackson. Small City Grant.~|~05 - 4R Maintenance - Resurfacing~|~6CE06B5B39EB556434BF199FA34E95BCBBB99303 116149~|~1~|~1~|~01/IMS~|~Resurface existing roadway using fine graded polymer modified asphalt concrete.~|~05 - 4R Maintenance - Resurfacing~|~BA8B7433D6433578370DEF4BC5339F617D924179 92698~|~1~|~1~|~01/STR~|~Plan Split for Culverts on ATB-SR46. SLM 3.30, SLM 8.76, SLM 9.39, and SLM 12.25~|~44 - Other~|~42424F04B0DC42A458955B8FE4C837222A4BE595 92698~|~2~|~2~|~02/STR~|~Culverts on SR-7/45/84/307/534. SLM ATB-7-16.02. SLM ATB-45-5.78. SLM ATB-84-1.02. SLM ATB-307-18.99. SLM ATB-534-5.96.~|~44 - Other~|~5BAEDFCEE4A2E4DB6B0966CED37923A1AD72C13C 86872~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR-213 over North Fork Yellow Creek. In stream work is required.~|~13 - Bridge Rehabilitation~|~5A32F006DE9C85734BFB41F9B3DC1A1E9421B5F4 114747~|~1~|~1~|~01/NHS~|~PIK double micro~|~05 - 4R Maintenance - Resurfacing~|~821AA3DE5FBEDEB71091AC3D3A88303F45C40294 95891~|~1~|~1~|~01/S>2~|~80/20 federal/local funding split for all pavement work.~|~05 - 4R Maintenance - Resurfacing~|~79BBF0EC7838F5421B70E5BBB6D85E55F702746E 95891~|~1~|~2~|~02/S>2~|~Work items at 100% local participation.~|~05 - 4R Maintenance - Resurfacing~|~7A03D5FEF37D00C6801D232E867C71CF783678DD 109478~|~1~|~1~|~01/S>2~|~Install sidewalk where it is currently not present.~|~28 - Facilities for Pedestrians & Bicycles~|~54B546B15D56F454184F6E627667CFBE7E89C451 102004~|~1~|~1~|~01/MPO~|~Resurface Meridian Road from I-680 to Trumbull County Line. Replace concrete roadway between the I-680 interchange ramps, includes catch basin repairs and installing curb ramps where needed.~|~05 - 4R Maintenance - Resurfacing~|~5A688E8B300FF2BC48DC2A46F947EE8D3A5D3D4F 93030~|~1~|~1~|~01/SAE~|~Upgrade Lighting at RR overpass01/SAE/OT/~|~21 - Safety~|~5AA946C564FC4ED372FA189225A1DE78476F8DF4 87800~|~1~|~1~|~01/NHS~|~Plan split for pavement work.~|~05 - 4R Maintenance - Resurfacing~|~10C71D2A6C336C0748CB30C8A9F4A59318C95BD9 114161~|~1~|~1~|~01/IMS~|~Reconstruction of I-75 from Findlay St. to just south of Marshall Ave. This is the northern end of the Brent Spence Bridge Corridor Project. Project includes the construction of a new interchange on I-75 to connect to the new Western Hills Viaduct (WHV). The WHV project is being developed by the City of Cincinnati.~|~01 - New Construction~|~D2C4E7D794956E433D814E2C0ECE47A4820B1BB6 114161~|~1~|~2~|~02/IMS~|~This split covers bridge work on the project~|~01 - New Construction~|~98F09FF9DAB5268CBB3FD2ED10BFB523F8EAC25B 105945~|~1~|~3~|~03/S>2/NILE~|~City of Niles waterline relocation.~|~43 - Utilities~|~F264371CECE00936C5BE24B05733CE227FF835FD 105945~|~1~|~1~|~01/S>2~|~Resurfacing of TRU SR-46 in Weathersfield Township, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~06937935B57AE427FED5862EBB242F9723B16B4F 105945~|~1~|~2~|~02/S>2~|~Reconstruction of drainage system along TRU SR 46.~|~04 - Reconstruction - No Added Capacity~|~AAA31E10EAAB6F1B8757BDB8A694286E0FB6618D 114103~|~1~|~1~|~01/S>2~|~Replace storm sewer along US 62~|~04 - Reconstruction - No Added Capacity~|~04D70250E37E8E8B4BD0611487A13FFE340C99B4 114103~|~2~|~2~|~02/SAF~|~Widen and overlay pavement to provide a southbound right turn lane on US 62 at Alkire Rd~|~21 - Safety~|~6300E79CADBB92FA0637281DCA4DA3ADB1547645 111290~|~1~|~1~|~01/NFP~|~Guardrail ding and dent contract for Franklin County~|~21 - Safety~|~AEDA7B711F55534E2ED6662B89EF3F47521C7450 109788~|~1~|~1~|~01/NHS~|~NHS - Double Microsurface the existing pavement.~|~05 - 4R Maintenance - Resurfacing~|~5A7F182BFCED672ABF5D04675CDB8AADC0922A95 109788~|~1~|~2~|~02/STR~|~NHS - Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~6C651AC46EF12348148FF5373E36B0AC7B411D93 109788~|~1~|~3~|~03/NFA~|~Not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~2292BECEA5195829813A73C4FB09236D79291937 99656~|~1~|~1~|~01/NFP~|~Ligting maintenance contract district wide.~|~44 - Other~|~A28B1B28C9384131E872321A389A53304E15E783 121003~|~1~|~1~|~01/NHS~|~Resurfacing on HAM-50~|~05 - 4R Maintenance - Resurfacing~|~883EA4A133FAE3073008CA3B43B1BF8F65BAC923 126756~|~1~|~1~|~01/SAE~|~Plan split for CEAO HSIP funding~|~21 - Safety~|~14FE8C448A857F56197F1F5736F85E7DFB443A0A 107752~|~1~|~1~|~01/STR~|~Covers all work to rehab bridge~|~13 - Bridge Rehabilitation~|~5A8FC9EF7F133540EFB3DE1DF3708516DC4AAF65 119771~|~1~|~1~|~01/SAF~|~Sidewalk and associated work on South Locust Street~|~21 - Safety~|~5046DBF4E052ED69448C1E52A3E2D7EBAB423ECF 96321~|~1~|~1~|~01/IMS~|~District Preservation Bridge Program 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP ? Deck overlay: 1) SFN 4503813, LIC-IR 70-1781 carrying IR 70 over Lancers Road. Not BR Eligible for Rehabilitation: Length=155; SD/FO = (2); SR = 90.0; DSR = 7; 2) SFN 4503902, LIC-IR 70-1943 carrying IR 70 over SR 13. Not BR Eligible for Rehabilitation: Length=173; SD/FO = (2); SR = 94.0; DSR = 7;~|~13 - Bridge Rehabilitation~|~DEF1B1DE6CF770C2FC6E9EB290CEE7AE254F4FEB 101867~|~1~|~1~|~01/NFA~|~Guardrail replacement on various CR in Adams County.~|~21 - Safety~|~9C48D7F4510F50AD89EB2E695C1E5B32CB524802 106427~|~1~|~1~|~01/SAF~|~Construct sidewalks and upgrade traffic control near Lincoln Heights Elementary School.~|~28 - Facilities for Pedestrians & Bicycles~|~B57278B699B18E9616A72F5D52303965E2A9FB3F 84457~|~1~|~1~|~01/BRF~|~Plan Split for SFN 7844255 TRU Parkman Mesopotamia Rd bridge over Andrews Creek~|~10 - Bridge Replacement~|~42C4977549E8EF5EC9A06A3F1AAF37C9EF4F79E1 111942~|~1~|~1~|~01/NHS~|~Installation of a temporary traffic signal at the intersection of the SR 7 southbound off ramp and SR 872/Ferry Landing Road.~|~21 - Safety~|~FBCA4327C19FE39BE2115FC64E882A864B72E92F 97695~|~1~|~1~|~01/STR~|~"01/STR/OT " - plan split for construction of a salt storage building at near Village of Baltic.~|~~|~E9DBE97FF84789EA01C0EC6B3A2416D6BD555083 96624~|~1~|~1~|~01/NFP~|~All work is in this split. Funding is 100% state funds from the District Preservation Program budget. The SAC 7BPB bond funds are to be used before the SAC 4PS7 funds.~|~21 - Safety~|~587972B140A2D43A3C80FFD63A2EEB9D8A9BD91E 101059~|~1~|~1~|~01/STR~|~This plan split is for the rural routes.~|~05 - 4R Maintenance - Resurfacing~|~D53DFCCDB3ED63B09B8C116BCC06F0BC431841BC 101059~|~1~|~2~|~02/NHS~|~This plan split is for the NHS route.~|~05 - 4R Maintenance - Resurfacing~|~312243F518AA13564BAE76BDDC26FBB3D2969524 101059~|~1~|~3~|~03/S<2~|~This plan split is for the small urban route.~|~05 - 4R Maintenance - Resurfacing~|~5AEA969B4BB4DAAE2FF8AAACE2FF5DDA2C083114 91366~|~1~|~1~|~01/STR/PIK~|~In Pike County, on CR50 1.95, it is proposed to repair the slip. Federal Declaration #OH11-02 80%fed/20%local~|~44 - Other~|~98F025FD0A8D76572392D49806EDF72499EDD4C2 91366~|~1~|~2~|~02/STR~|~Temporary repair of the slip on PIK CR 50 1.95 DSR# PIK-001~|~~|~5CD847C6A6F11BB85C40255BB42FAD758D7FD927 101423~|~1~|~1~|~01/STR~|~PIK CR4 3.98 Emergency job.~|~04 - Reconstruction - No Added Capacity~|~1872BEF59335C364750E6D43DF0366B19A1FE2FB 117173~|~1~|~1~|~01/CMQ/STRE~|~New signal.~|~~|~FFFE54A7E6689ECEDA2ABCA5AA5A9617D2D25B7B 79976~|~1~|~2~|~02/NHS~|~Bridges for Rehab7100213 4.9007100272 6.74080/20 split~|~05 - 4R Maintenance - Resurfacing~|~57EF3483AA74DDB23235B5FF0F071DD4C092F3A2 79976~|~1~|~1~|~01/NHS~|~ It is proposed to resurface US23 from 4.63 to 8.39 with asphalt concrete.Brdgs for Pave Thru:7100302 7.70 7100248 4.9780/20 split~|~05 - 4R Maintenance - Resurfacing~|~93B86ACDE18600F7432E0E8AC413856E5282F524 105600~|~1~|~1~|~01/NHS~|~HUR SR 0018 21.69.~|~10 - Bridge Replacement~|~E2CF8E29EF2A5A7BCD63771FFF5A6D1FE493B6EF 82566~|~1~|~1~|~01/S>2~|~This project is funded with a SIB loan. All work will be under this plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E224BA69B5DAF17A373DC7AE60A3D071E342D690 92399~|~1~|~1~|~01/ENH~|~Knox County Project for extension of Heart of Ohio Trail~|~28 - Facilities for Pedestrians & Bicycles~|~7DFD08740BA5E18BAFA2329EBF56EC029FE0474A 116996~|~1~|~1~|~01/NHS~|~TLCI Work~|~44 - Other~|~961D5C779C2BD4A30310CFEC568753CD6F101675 121564~|~1~|~1~|~01/NHS~|~NHS Plan Split~|~05 - 4R Maintenance - Resurfacing~|~346691A45F8A383D6CC50D7F8B2493511ED5808B 25529~|~1~|~2~|~02/NHS~|~This is for the noise wall on US-6 from SLM 11.32 to 11.25 (NHS).~|~01 - New Construction~|~0000D36C03934FDEF9B46C32CD070C222DB0F85D 25529~|~1~|~1~|~01/NHS~|~reconstruction HEN US 6 10.95-17.24 and HEN US24 9.80-10.42; NHSincluding the following bridges:3500217 HEN US6 11.5 Intersect: Oberhaus Creek3500241 HEN US6 11.5 Intersect: Oberhaus Creek3500276 HEN US6 12.26 Intersect: Abandoned Rr3500306 HEN US6 12.26 Intersect: Abandoned Rr3500330 HEN US6 12.47 Intersect: State Route 1083500365 HEN US6 12.47 Intersect: St Rt 1083500454 HEN US6 12.7 Intersect: Van Hyning Creek3500489 HEN US6 12.7 Intersect: Van Hyning Creek3500519 HEN US6 13.86 Intersect: Industrial Drive3500535 HEN US6 14.38 Intersect: County Rd 123501477 HEN US6 11.5 Intersect: Oberhaus Creek3500152 HEN US6 10.94 Intersect: Us Rt 24 &Us Rt 6 Eb3500578 HEN US6 16.5 Intersect: Maumee River~|~04 - Reconstruction - No Added Capacity~|~081399F5350F3E921B583CAFF81C77123CA54191 120973~|~1~|~1~|~01/NHS~|~Established Plan Split for CO CC 1~|~05 - 4R Maintenance - Resurfacing~|~8EC7EDECC7309A5C351097D8CC4BEB45317042D1 99931~|~1~|~1~|~01/STR~|~Pave culvert inverts. Funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~313BF97525C429FEAEC8F66B26213C916FA8DE99 89460~|~1~|~1~|~01/NFA~|~Reconstruct railroad crossing.~|~22 - Rail/Highway crossing~|~0039905822FFCCDA085276AD5E69A3897075AE4A 123212~|~1~|~1~|~01/STR~|~Resurfacing project using an asphalt overlay treatment. ATH 278 0.00-2.135. Rural other federal aid funded 80 Federal/20 State.~|~05 - 4R Maintenance - Resurfacing~|~DB6CB0D75E711523B2CB118FBD1C4BFC427134C7 123212~|~1~|~2~|~02/S5K~|~Resurfacing project using an asphalt overlay treatment. ATH 278 2.135-3.846. Urban federal aid funded 80 Federal/20 State.~|~~|~BF5045CAEBCFE7203FC433174FB73008D52146AD 107524~|~1~|~1~|~01/STR~|~Resurfacing HAS-646~|~05 - 4R Maintenance - Resurfacing~|~454D99C6A0421AFA503D4AC374907A2FFE6C5D2A 107385~|~1~|~1~|~01/NHS~|~Spit for resurfacing work~|~05 - 4R Maintenance - Resurfacing~|~80C3325DC51F7EC2440E6D80E2D3D7C48020FB33 109782~|~1~|~1~|~01/STR~|~Ac Overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~90BFF0595E00829B75FBB6D5B136809D9463F855 112249~|~1~|~1~|~01/NHS~|~All items associated with crack sealing on FRA-23, PIC-23, and FAY-35~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4A60256E74EEA8637C0119DDCB74F25E8EDEF2D1 91464~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 6.59-19.96. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~3F2B98B0C6AAACFA252A49660DB479D510DBF6A5 91464~|~1~|~2~|~02/S<2~|~Two-Lane resurfacing project using an asphalt overlay treatment. GAL 554 19.96-20.18. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E5065A5C79206AFE6713A60D767F2BF068D7CE02 105263~|~1~|~2~|~02/STR~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~6ED7EC3729B159372EE4C15FE93CD44F92C0BD5C 105263~|~1~|~1~|~01/S<2~|~AC overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~F818543A70A1D471D1809ABF71F90BCE2A01F7FD 105263~|~1~|~3~|~03/NFA~|~Resurface SR 705 Not on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~F5B4C158F359AD314D3F9CB5B1C3B0E66D61EAF5 95979~|~1~|~1~|~01/NFP~|~design and construction of new building at brunswick outpost~|~44 - Other~|~93B403794652027CD35E6B33B9C19B84C6EA3D96 121186~|~1~|~1~|~01/S>2~|~STP >200,000 Plan Split~|~05 - 4R Maintenance - Resurfacing~|~C2BE5BD259905A2257818433A5F3A7F1E809BBDD 121186~|~1~|~2~|~02/STR~|~STP Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~DBED88EB740790C8096F1235FECDDEE6CE8F4B50 106690~|~1~|~1~|~01/IMS~|~Split for bridge work.~|~13 - Bridge Rehabilitation~|~DC66532CAA143C224F39277C2402D9DD1DE90448 118873~|~1~|~1~|~01/STR~|~plan split~|~05 - 4R Maintenance - Resurfacing~|~B59FE3E01A2C8F7DF81B8584646BB728C2E5C392 118873~|~1~|~2~|~02/S5K~|~plan split.~|~05 - 4R Maintenance - Resurfacing~|~C2987CE5949036DACBD8B430817771A68EE44C0E 123938~|~1~|~1~|~01/SAF~|~Geotechnical stabilization~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E05CA6BC7202CDB8977F2293A2215A59FF4E6BDE 101668~|~1~|~1~|~01/NFA~|~Guardrail replacement project for FY2020. HOC CR 1 0.00-2.71, CR 2 0.00-2.06, CR 72 0.00-1.71, and CR 76 0.00-4.31. Funded 100% federal.~|~21 - Safety~|~ACDC952CEF8898499BEB288C70DC109E0CEEDB4A 101668~|~1~|~2~|~02/S<2~|~Guardrail replacement project for FY2020. HOC CR 14 0.00-0.81. Funded 100% federal.~|~21 - Safety~|~2745BF9684C7385A7DB294DEDEA3F09E920ABBCD 101668~|~1~|~3~|~03/STR~|~Guardrail replacement project for FY2020. HOC CR 14 0.81-1.81. Funded 100% federal.~|~21 - Safety~|~B821B8BF58A87ED35BFA952CED595054F6EC57AC 107526~|~1~|~1~|~01/NFA~|~Resurfacing SR 751~|~05 - 4R Maintenance - Resurfacing~|~64E5407A57D1749ADA05D7B28CB5585AD624D3EB 107526~|~1~|~2~|~02/STR~|~Resurfacing TUS-751 from CR 21 to IR 77~|~05 - 4R Maintenance - Resurfacing~|~6947E39CE44817715B7B7BF99EF1F5213BF5BAC2 93043~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing with related work on Fai-US 22-00.00 to 10.58~|~05 - 4R Maintenance - Resurfacing~|~84B9B6423ACA1B84999192359CBA26CD254D388D 93043~|~1~|~2~|~02/NHS~|~"02/NHS/BR/ " - District Preservation 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Bridge work items on 1) Fai-22-1063 SFN 2300850 carrying US 22 over US 33~|~13 - Bridge Rehabilitation~|~3F8D15BF96FAC829CA7A74A75001C3E84E8196E2 102815~|~1~|~1~|~01/IMS~|~Widen IR 270 between IR 670 interchange and bridge over Big Walnut Creek~|~~|~C59F56B9B8F77C6B311CFB5B24E5758BD8D5080D 102815~|~1~|~2~|~02/SAF~|~Raise Goshen lane structure over IR 270 due to widening.~|~~|~31D1235C5D8F79EDC6C2346FD7C4BACDF68AA017 102815~|~1~|~3~|~03/IMS~|~Goshen Lane structure minor repairs and painting of structural steel~|~~|~ACACD1E20E7A92A52258EB5E29080E4A17293983 88357~|~1~|~1~|~01/BRO~|~Replace Bridge SFN 6737080 West Main Street Bridge over CSX RR and Cuyahoga River~|~13 - Bridge Rehabilitation~|~A50F56CFC32BDF28BCE89291FCE04E20F3C1B562 96552~|~1~|~1~|~01/STR~|~See linked structures > 20' span.~|~13 - Bridge Rehabilitation~|~BF564A3D8006F9E40AF0457D76FA36C2BE2E8277 96552~|~1~|~2~|~02/STR~|~See linked structures 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~0D00900E266D0760536AFAACD90914761E19C1E4 96552~|~2~|~4~|~04/STR~|~See linked structure >20' span.~|~13 - Bridge Rehabilitation~|~75E5B000301520D2C3BDCA225B3233DB65D45809 96552~|~1~|~3~|~03/STR~|~Erosion Repair along SR 534.~|~04 - Reconstruction - No Added Capacity~|~E14F9FBBE4C4D4045E3B54013DCE9BC32E55A91C 87152~|~1~|~1~|~01/STR~|~01/STR/PV This split is for work eligible for rural STP funds.~|~05 - 4R Maintenance - Resurfacing~|~0F3BD46BF29592B4E6197712E6DEFBD9BBF1821F 124054~|~1~|~1~|~01/NFP~|~Plan Split for the traffic signal upgrades at various locations in the district.~|~21 - Safety~|~98350C7EF63531DCCFB2B14ADFE5D91C067EF850 98660~|~1~|~1~|~01/IMS~|~Plan split for all work~|~44 - Other~|~A7E68F04477CA2C1AD02BDD0F1FE1B88B2F05C92 86731~|~1~|~3~|~03/STR~|~District Allocation~|~13 - Bridge Rehabilitation~|~215A7929B76880FFFC95C9BF42984CE45DAF948B 86731~|~1~|~2~|~02/S<2~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~AD0E4ABD2F6A88E6C536EBCC8A749870088B8FB7 86731~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~C0E6EAB8989384B5387E44C7C57D3C80CA11ED2F 118899~|~1~|~1~|~01/STR~|~Resurfacing SR 3~|~05 - 4R Maintenance - Resurfacing~|~36B148564D9793DCB08EB16A95EB99589E17E648 88065~|~1~|~1~|~01/BRO~|~8701202 WOO US20 10.09 Intersect: Crane Creek~|~10 - Bridge Replacement~|~C70BD3668459B81862CC838F7D902270D33148C9 88065~|~1~|~2~|~02/NHS~|~8701172 WOO US20 9.25 Intersect: Crane Creek Branch~|~10 - Bridge Replacement~|~DDD16ED21130940D4864F04C30251433111F3287 96675~|~1~|~1~|~01/SAF~|~Microsurface approach lanes of MOT SR 48 4.33 (@ SR 725/Alex Bell Road), MOT SR 48 17.09 (@ Turner/Shoup Mill Road) and MOT SR 201 7.56 (@ Chambersburg Road).~|~21 - Safety~|~AB6F51D6C1342731379C38AFF2BFCE345178E1E7 121585~|~1~|~1~|~01/STR~|~Culvert Replacement~|~04 - Reconstruction - No Added Capacity~|~C125876CAA9FDF7721AAA648060EB8019F4227EB 88954~|~1~|~1~|~01/STR~|~SFN 7805497 SR87 12.71 Pymatuning Creek~|~~|~7E26918D9E2DF0270DCDED1FDBD3CDE9F5E34FD6 104404~|~1~|~1~|~01/NFP~|~Maintenance contract for SFY 2018/2019 herbicidal spraying. Various routes and sections in D10. Funded 100% state.~|~44 - Other~|~4FFB553272E09EC2D024B4B70C55EE794A7C6D2F 83912~|~1~|~1~|~01/NHS~|~Construction cost to remove and rebuild a failing retaining wall along the east side of US 22/3 using GSM funds.~|~04 - Reconstruction - No Added Capacity~|~DC544860FAE26710ED481C90A6AAFCFCCDF422A8 83912~|~2~|~2~|~02/SAF~|~Add left turn lane from US22 to Lakeshore within existing right of way.~|~21 - Safety~|~559CB33C190DC179A175A3DEF58E6841B26241A2 83912~|~2~|~3~|~03/SAF~|~warren county water line relocation~|~21 - Safety~|~BB72CD8225EECC73496D782AF89FEC93324DCFBD 110305~|~1~|~1~|~01/IMS~|~Demolition of buildings on 4 parcels. Only buildings in this contract shall be demolished in their entirety and debris/materials disposed of off-site. These building removals are required as part of the HAM-75-7.89 (PID 77889) project.~|~44 - Other~|~E598D98660D0FD99B56EB5DF1C83659A95E23AA4 86903~|~1~|~2~|~02/S>2~|~100% local plan split~|~05 - 4R Maintenance - Resurfacing~|~08D12544E4C9F865774963D834DD055B460FF314 86903~|~1~|~1~|~01/S>2~|~85/15 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~2DEFE10FBDB33F2A3ABCC9BECE8ABCD09F8EE3D6 125234~|~1~|~1~|~01/S>2~|~Widen Feedwire Rd (CR-21) in Greene County for additional capacity.~|~03 - Reconstruction - Added Capacity~|~A954111A3063890F0A3D61C9809CF16E55CF8703 125234~|~1~|~2~|~02/BRO~|~Expansion of the bridge carrying Feedwire Rd (CR-21) over IR-675 in Greene County.~|~10 - Bridge Replacement~|~3AA1B660D582D56D28B54CA8E6BE947B2D985CEE 122849~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~A351A14CE52F37453AF73387111938FF8062C6D4 116626~|~1~|~1~|~01/STR~|~Plan split for resurfacing SR-357~|~05 - 4R Maintenance - Resurfacing~|~EBEBBA119A18D15F0B0C1FD69190E86449D33598 123569~|~1~|~1~|~01/IMS~|~Lighting replacements along a portion of HAM-71~|~21 - Safety~|~689FC39736E6273DE0D40967E0048FC89158AD10 96790~|~1~|~1~|~01/S<2~|~Microsurfacing of TUS-416 from Tuscarawas to New Philadelphia including pavement repairs and pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~05F3C524E154DF0EA943477C882DED7FAE6CBB98 117797~|~1~|~1~|~01/MPO/STCE~|~Structure replacement.~|~10 - Bridge Replacement~|~2301B849CF10F493FF6F0AD9C90EC173A8BCBFC8 107688~|~1~|~1~|~01/IMS~|~Capacity improvements at SW Interchange.~|~~|~296D2B56A8D6CB5154E38BE952E37057773BCAB1 98170~|~1~|~1~|~01/STR~|~STP Rural Bridge 80/20 Non-BR MAD-323-3.91 over Paint Creek~|~13 - Bridge Rehabilitation~|~71AB1061AA80DCCB24C1DFBD23C415D223C4B268 101124~|~1~|~1~|~01/IMS~|~Freeway systematic sign replacement at various locations throughout District 2.~|~44 - Other~|~56FF0373EEC3D09718FFC2E9CE653EAA3E4CC331 120292~|~1~|~1~|~01/SAF/MACE~|~Guardrail upgrades on various county routes in MAH County.~|~21 - Safety~|~CFFF2F327B7E165E670EF4CEAA98502CFDB709B1 114012~|~1~|~1~|~01/SAF~|~ROS CR VAR PM FY26~|~21 - Safety~|~BFABE3147924E8A8F0C4F5FBC28EC8C502BE069B 111353~|~1~|~1~|~01/NFP~|~Microsurfacing in Hueston Woods State Park~|~28 - Facilities for Pedestrians & Bicycles~|~A55C2422E75F10748D679A0DA08B801071D87416 90852~|~1~|~1~|~01/MPO~|~Reconstruction including installation of new curbs, storm sewer, water main, utility relocation, street lights, communication fiber extension and traffic signage upgrades. Also included is replacement of some loop detectors, all new traffic control signage, guardrail and traffic markings on CR 25A from SR 571 to Michaels Road.~|~31 - Landscaping & Other Scenic Beautification~|~73CB2937AF1ABEA6830EA0431D731A868844BA57 117499~|~1~|~1~|~01/CMQ/STCE~|~Construct roundabout at the State St/Cleveland Ave intersection.~|~21 - Safety~|~D1CEE64425FBE4B2D332126B0523DF3614CB0C29 124053~|~1~|~1~|~01/NFP~|~Plan split for sign replacement and upgrades at various locations in the district~|~21 - Safety~|~A138397912DFC0A1A85788C79338EB4DD4DA6BFB 120472~|~1~|~1~|~01/SAF~|~Safety work.~|~21 - Safety~|~9E49242059611280FF45C4D3FE3560195C186707 111002~|~1~|~1~|~01/SAF~|~Install sidewalk along the north side of West Limestone Street from Mills Lawn Elementary School to Dayton Street.~|~28 - Facilities for Pedestrians & Bicycles~|~CB06EDFC95FC24F295920B5B4EBA913AC3260E49 97108~|~1~|~1~|~01/SAF~|~Plan split for lighting maintenance contract. Routes to be determined.~|~21 - Safety~|~25C7CDDC15041C06CCBD1DA90630942C22C82B51 106162~|~1~|~1~|~01/STR~|~Landslide repair. WAS 145 3.14. DSR WAS-001. Rural other federal aid funded 80 federal/20 state. ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~740C7183AAA7C4D751541C0CB08EBE0466AC0BDE 109165~|~1~|~1~|~01/STR~|~Two lane resurfacing 80% federal (4B77) 20% local (LNTP).~|~05 - 4R Maintenance - Resurfacing~|~9E75E6A0406BE4E90FE6FCFB6B615954946BB004 96340~|~1~|~1~|~01/NFA~|~Rehabilitation of the 5 mile long section of the Lebanon, Mason, & Monroe (LM&M) railroad owned by the City of Lebanon. Improvements include replacement of approximately 600 defective rail ties and rehabilitation of 4 bridges along the line.~|~44 - Other~|~BD6DEBFF4E656F91863F08103B01D3D52D2B593C 97630~|~1~|~2~|~02/BRF~|~Replace MRW-TR 175-0.12 (Shurr Rd) structure over South Branch of Kokosing River SFN 5931894~|~10 - Bridge Replacement~|~E3939869B6A8ADF8BEEC6FF50144A4FF0F9B8A36 97630~|~1~|~3~|~03/BRF~|~Replace MRW-CR 180-0.19 (Dailey Rd) structure over Kokosing River SFN 5932157~|~10 - Bridge Replacement~|~EB91324DC17BE7095C4C05F72265DDA2A39364EB 97630~|~1~|~1~|~01/BRF~|~Replace MRW -TR 82-0.94 (Craven Rd) structure over a tributary to Cedar Fork Creek SFN 5931843~|~10 - Bridge Replacement~|~3D42E8A2DE63F8D865591674766E791793471A62 110246~|~1~|~1~|~01/NFP~|~Normandy Park Drive Roadway Improvements~|~04 - Reconstruction - No Added Capacity~|~1D3D867964FC4809380D97C0AE6FF6F864BECB79 83848~|~1~|~1~|~01/STR~|~District Preservation Pavement Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) COS-SR 229-0.00 to 0.70; 2) KNO-SR 229-14.41 to 25.38;~|~05 - 4R Maintenance - Resurfacing~|~98B190126A38AE882E5133F8E41C8C2D3B0E5F2A 83848~|~1~|~2~|~02/S<2~|~District Preservation Pavement Funding - 4PF7 (870% Federal) / 4PS7 (20% State) - No CAP - Resurfacing with related work on: 1) KNO-229-9.53 to 14.41; 2) KNO-308-0.00 to 0.30,~|~05 - 4R Maintenance - Resurfacing~|~890BD7CC0423E844F80AC867460CC0C7436EB136 113563~|~1~|~1~|~01/NFA~|~Created for J&C involvement~|~~|~CC847A841E11F292014AB83C1B90ECAD3A0ED03A 125995~|~1~|~1~|~01/NHS~|~Split~|~05 - 4R Maintenance - Resurfacing~|~5BFC10F60BD6C974F7A7F512F04E5464AA6456AA 112465~|~1~|~1~|~01/MPO~|~Split for MPO funds eligible work~|~05 - 4R Maintenance - Resurfacing~|~A6A72F21F951364B8A321D92AEE8FCFB71F29850 117153~|~1~|~1~|~01/SAF~|~South Green Drive Pedestrian Safety Improvements. Work includes RRFB, signing, markings, curb ramps, bulb outs, etc.~|~21 - Safety~|~4E0599A7AB65CB5A5E54CA640EB476BD81B684A6 102440~|~1~|~1~|~01/STR~|~Guardrail replacement on various routes in District 11~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~36628CDC83CD0B99F67BB457149EDC1DED9446A0 100887~|~1~|~1~|~01/STR~|~JAC 279 10.13 (SFN 4003098)~|~10 - Bridge Replacement~|~B070ACF9364FD9C8AF271AD6E51E6929F87B22C5 107965~|~1~|~1~|~01/IMS~|~Plan Split for pavement work~|~~|~DD075F858502C191FC03D03CAB5BA0D9274102A3 82202~|~1~|~1~|~01/STR~|~This split is for the 18.00 portion of the project. The funds are from the District Preservation Program.~|~44 - Other~|~6F9BC9D613A1F27198993916F0C6929A092EE767 82202~|~1~|~2~|~02/STR~|~This split is for the 16.90 portion of the project. The funds are from the Geologic Site Management (GSM) program.~|~44 - Other~|~9C5AEC7FDC9302B7C617A32C8B11113C32DA81C5 107367~|~1~|~1~|~01/IMS~|~District Preservation Conduit Funding - 4PF7 (90% Federal / 4PS7 (10% State) - No CAP - Repair or Rehabilitation of conduits identified above.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~322F27D97E1FA9BB4D1394D1A8F2EB45BB57BBCC 107367~|~1~|~2~|~02/NHS~|~District Preservation Conduit Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP - Repair or Rehabilitation of conduits identified above.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9D144F0AE9F42AC98068D7FBDC94E0A95BE618CE 107367~|~1~|~3~|~03/STR~|~District Preservation Conduit Funding - 4PF7 (80% Federal / 4PS7 (20% State) - No CAP - Repair or Rehabilitation of conduits identified above.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4F872450FF8768B2B426A1B80CB15C0439121218 114069~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction costs~|~21 - Safety~|~EBD66207BA44881FBBA55C6EE83EF4EA89B53AFF 124299~|~1~|~1~|~01/NHS~|~Vegetation clearing around bridges in D11.~|~47 - Bridge Preventive Maintenance~|~A8B6B9E2ED47CB6E98EF0523803117BA13C907E0 124339~|~1~|~1~|~01/ENH~|~Programming project. ~|~28 - Facilities for Pedestrians & Bicycles~|~6EEAE69A22A1ED1352A5CEA24CB8043572DE65BE 102533~|~1~|~3~|~03/NHS~|~District Preservation Bridge Funding - 4PF7 (80%)/4PS7 (20%) - No CAP - Deck sealing and MSE Wall Repairs at various locations on NHS Routes in District 5~|~47 - Bridge Preventive Maintenance~|~46899B6C92BB1255A64007C7480F1CB15DB70E81 102533~|~1~|~2~|~02/IMS~|~District Preservation Bridge Funding - No CAP - 4PF7 (90%)/4PS7 (10%) - Deck Sealing on Interstate Locations in District 5~|~47 - Bridge Preventive Maintenance~|~D267112EFE9DAA39890CAB41F3D416A456ECDB0A 102533~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80%)/4PS7 (20%) - No CAP - Deck Sealing on OFAH-Rural locations in District 5.~|~47 - Bridge Preventive Maintenance~|~F6C6C11023637D54D30CF73ADEE5467C3738DDCF 102533~|~1~|~4~|~04/S<2~|~District Preservation Bridge Funding - 4PF7 (80%)/4PS7 (20%) - No CAP - Deck Sealing on OFAH-Urban locations in District 5.~|~47 - Bridge Preventive Maintenance~|~6199987C7941DC50D77A63FF051E41F58C6853E1 127027~|~1~|~1~|~01/S>2~|~80/20 Urban Paving Items~|~05 - 4R Maintenance - Resurfacing~|~6E94E1B553FA4413709C1302E611579F87DAFCEC 107271~|~1~|~1~|~01/NFP~|~Repair of CR 3 in Putnam County after the installation of a water line~|~04 - Reconstruction - No Added Capacity~|~22F23F6FF3A4CF7CA88739572E969E7BFBA06B50 121037~|~1~|~1~|~01/NHS~|~Crack sealing ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7AD21A5086E7C3A83A9E0F3AB9C35E8ED6301C4C 125429~|~1~|~1~|~01/NFP~|~CS FY32 plan split.~|~99 - State Preventative Maintenance~|~E75C8F2EA2C5096E3190C4E885501CB0EF382D66 115985~|~1~|~1~|~01/NFA~|~Widen Upper Valley Pike by 2 ft. on each side~|~21 - Safety~|~D608CC953B7318FA25198AAC6141FA22BD5B5BD2 94234~|~1~|~1~|~01/NHS~|~01/NHS/PV/ ; District Preservation 4PF7 (80% federal) / 4PS7 (20% state) - No Cap - All work in this project is in this split.~|~05 - 4R Maintenance - Resurfacing~|~C40A72C81D195390A025CB43E50933CE46CAE548 94234~|~1~|~2~|~02/SAF~|~Recessed wet reflective pavement markings.~|~05 - 4R Maintenance - Resurfacing~|~2D9EEBF5433C81DDADE556FD4A98CF8C664B6A0C 88690~|~1~|~2~|~02/S<2~|~Microsurface the existing roadway MIA-SR-718 4.300 to 8.160~|~05 - 4R Maintenance - Resurfacing~|~78D6AD7CF43AAC03DCC177A9D7A78DAF6E05A65D 88690~|~1~|~4~|~04/STR~|~Microsurfacing the exisiting pavement from the N Corporation Limit of Celina to the Mercer County Line. SLM 14.68 to 26.13.~|~05 - 4R Maintenance - Resurfacing~|~86B98E62E738EC508F77B456982EDB0B4A9E9F65 88690~|~1~|~5~|~05/SAF~|~Pavement Markings and/or replacements of RPMs as needed for project.~|~05 - 4R Maintenance - Resurfacing~|~A97F71BB4D2447C8E3F4EF5578F203C7237629AC 88690~|~1~|~3~|~03/S>2~|~Microsurface the existing roadways MIA SR 718 8.16 to 8.26.~|~05 - 4R Maintenance - Resurfacing~|~BDCCC88C748A474834885C7786CC71F00338E9FE 88690~|~1~|~1~|~01/NHS~|~Microsurface the existing roadways on: CHP-US-68 8.90 to 16.200~|~05 - 4R Maintenance - Resurfacing~|~CB6022E1D9DCF15249041F430FE4784E494B5AD8 96562~|~1~|~2~|~02/NHS~|~Minor bridge work to SFN 7700423 SUM 261 11.88 over SR 8/SR 59 eligible for BR funds for Rehab only.~|~13 - Bridge Rehabilitation~|~7C4BB4C055D17CF85DFE89DAE6788E05A7B2C3BE 96562~|~1~|~1~|~01/NHS/AKRO~|~Resurfacing of SUM SR 18 from 6.56 to 8.15, SR 261 from 10.89 to 11.33 and SUM SR 261D 0.64 to 0.80, urban paving in the city of Akron.~|~05 - 4R Maintenance - Resurfacing~|~6281EB9D11478F90E2C0D26DC0FA8C4CCBA0A668 96562~|~1~|~3~|~03/NHS/AKRO~|~100% city of Akron Items.~|~05 - 4R Maintenance - Resurfacing~|~A3966F8C7FD2EF0AE4EFE40FAEF6CD1A20DA2DDB 108954~|~1~|~1~|~01/SAF~|~Plan Split for SRTS funds~|~28 - Facilities for Pedestrians & Bicycles~|~B1EE68A1F5861D6A50C2DC7FF46F30AAA39137A0 107216~|~1~|~1~|~01/ENH~|~Add new sidewalks to SR 5 in Kinsman Township.~|~28 - Facilities for Pedestrians & Bicycles~|~43E0998A706CC4FA8F6A69FCCC087FACBCDDE63D 121235~|~1~|~1~|~01/STR~|~Plan split for chip seals~|~05 - 4R Maintenance - Resurfacing~|~EB7F639ADC631E6B11A59CF7FD381271678C7DBB 116584~|~1~|~1~|~01/S5K~|~Marion Urban Area plan split for resurfacing and resurfacing related items.~|~05 - 4R Maintenance - Resurfacing~|~5B2EC5C4C9CD0DCE27BCE5860C8482D17BDC4BA1 116584~|~1~|~2~|~02/STR~|~Rural plan split - covers resurfacing and resurfacing related items on the rural portions of MAR-95.~|~05 - 4R Maintenance - Resurfacing~|~F20F4EC2B830EFAC35FBE45117CEA82892C842DF 116584~|~1~|~3~|~03/STR~|~Work on three structures~|~47 - Bridge Preventive Maintenance~|~3EB055F91161AD498D204EB94CAA5F8B1795C9D7 125891~|~1~|~1~|~01/NFA~|~Resurfacing project using an asphalt overlay treatment. WAS 260 0.00-9.763, 9.981-11.00~|~05 - 4R Maintenance - Resurfacing~|~2C774001A7C0285ECD9A88AE166DABA042BE753B 97569~|~1~|~1~|~01/BRF~|~Replacement of Bridge No. BUT-TR 8-0002 (SFN: 0933910) in Butler County, and Bridge No. CLE-TR 960-0010 (SFN: 1331957) in Clermont County.~|~10 - Bridge Replacement~|~B2B3DEDB036ADA4A67A0F49320DD9DCF68040C46 97645~|~1~|~1~|~01/BRF~|~SFN 8633916~|~13 - Bridge Rehabilitation~|~3330D00FD45B86362466D22738E853EF2BD4431C 116392~|~1~|~1~|~01/NHS~|~TUS-250 resurfacing~|~05 - 4R Maintenance - Resurfacing~|~5855AF6F61629A2958C49ECF7BC9AA13F5772FA0 116392~|~1~|~2~|~02/S<2~|~TUS-36 and TUS-800I resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B2B7994CEA0D7408CA02A25445CBC02154F8156D 123763~|~1~|~1~|~01/BRO~|~Plan split for bridge maintenance work~|~47 - Bridge Preventive Maintenance~|~7E21EFDF936570C814092007E16D93E22DA1749A 93725~|~1~|~1~|~01/SAE~|~Installation of a new traffic signal at the intersection of the WB exit ramp and Brookville Arlington Road.~|~21 - Safety~|~D3977B87A8479F73D0C1A1C4EB2AA690B3D9D398 95946~|~1~|~1~|~01/NFA~|~Ohio Air Quality Development Authority~|~44 - Other~|~6D4031B5925549E17AB2331411AAA7FFF7C32C98 110743~|~1~|~3~|~03/NHS~|~Resurfacing in the Village of Silver Lake.~|~05 - 4R Maintenance - Resurfacing~|~AB6AB99007C89125BC50DDA5570F59203E0126B1 110743~|~1~|~5~|~05/NHS/STOW~|~Resurfacing, urban paving in the City of Stow.~|~05 - 4R Maintenance - Resurfacing~|~BA4B76BD4283C69699035A541BF1F31FAB0D216C 110743~|~1~|~6~|~06/MPO/STOW~|~ADA curb ramp reconstruction, full and partial depth repairs in the City of Stow.~|~05 - 4R Maintenance - Resurfacing~|~B70ABF8167DDCE4E0E9F035B4FFD2BFA092979EF 110743~|~1~|~4~|~04/NHS/SLAK~|~Full and partial depth repairs and drainage/catch basin repairs in the Village of Silver Lake.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~64161E172C280990BD61228E928EEEA72EE0E9E1 110743~|~1~|~2~|~02/NFP/CUYF~|~Full and partial depth repairs, ADA curb ramp reconstruction and paving on adjacent local streets.~|~05 - 4R Maintenance - Resurfacing~|~E9ADC347FF97CCF9ED81EFD3B6C29D3531EB4236 110743~|~1~|~1~|~01/NHS/CUYF~|~Resurfacing, urban paving in the City of Cuyahoga Falls, includes alternate bid for proprietary video detection system at Front St and Bailey Rd and Front St and Hudson Dr, in the City of Cuyahoga Falls.~|~05 - 4R Maintenance - Resurfacing~|~170579F07332AB5882D5BF71BECC9DA38FC03E87 88669~|~1~|~1~|~01/S<2~|~Crack Sealing on the General System for FY2016~|~99 - State Preventative Maintenance~|~05BA8C93F947E70F88BED3D2545434579FA56F87 122503~|~1~|~1~|~01/NHS~|~Deck replacement project on MOE SR 7 2148 (SFN 5600669). Work also includes superstructure repair. Funded 80% Federal/20% State.~|~13 - Bridge Rehabilitation~|~EACE1A639651A4C2B64FFB3D5E586A33D85AA80A 112829~|~1~|~1~|~01/STR~|~Resurfacing SR 172~|~05 - 4R Maintenance - Resurfacing~|~49B8229D115C0211444D610980DA7A7CC36E0033 121891~|~1~|~1~|~01/NFP~|~Pavement Reactive Maintenance ERI-250 and LOR-303~|~05 - 4R Maintenance - Resurfacing~|~D70993F6E992E9256C577D5E1C5934487EB811A4 115104~|~1~|~1~|~01/NHS~|~Rock fall maintenance by barrier installation.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~69F7108F29E8EF82E73DD6349B9D5E115B760BA1 123804~|~1~|~1~|~01/NFA~|~not on federal aid~|~05 - 4R Maintenance - Resurfacing~|~523FF606BAC9557BEF79F812EC1CDA9AE731E430 106539~|~1~|~2~|~02/ENH/BARB~|~Construct shared use path on Wooster Rd from 4th St NW to 2nd St SW in the City of Barberton.~|~28 - Facilities for Pedestrians & Bicycles~|~8E45F7735652F82A4B3B6781096371B2D2DBC3CA 106539~|~1~|~1~|~01/SAF/BARB~|~Intersection improvement at Wooster Road/Robinson Avenue area, in the City of Barberton, Summit County, Ohio.~|~21 - Safety~|~86F14DB50E8837BD76E0E46326440DF7B930E2D2 109484~|~1~|~1~|~01/NHS~|~One year Construction Inspection Agreement to provide General and Bridge Inspection Services district-wide. Estimated fee is $1.5M.~|~17 - Construction Engineering~|~E0DE83356BE2B0F5C920C331E8F16BDCFD7B16C4 107023~|~1~|~1~|~01/IMS~|~Plan Split~|~44 - Other~|~3F74BF2394D0AECD9926159BA6591B3086415941 112305~|~1~|~1~|~01/BRF~|~Bridge replacement on County Road 49 0.19; 80% 4C87/20% LNTP.~|~10 - Bridge Replacement~|~BDA5E3F6FB698F1896559B5D44A963F2624AA822 113949~|~1~|~1~|~01/SAF~|~Remove median pavement on Alum Cr Dr at Bixby Rd~|~~|~9B34CC21BF23D927009931DF116DB7D08057CE3F 109322~|~1~|~1~|~01/STR~|~Slide Repair DSR# LAW-002LAW CR 2 0.97~|~04 - Reconstruction - No Added Capacity~|~C74363555AE37D3000A160874C530BBF169164A1 112847~|~1~|~2~|~02/STR~|~Bridge Plan Split~|~47 - Bridge Preventive Maintenance~|~521F50F03AA3BA9C40B890883B7941FEFB79CE66 112847~|~1~|~1~|~01/STR~|~Rural Plan Split on MAR-309, MRW-309 and MRW-61.~|~05 - 4R Maintenance - Resurfacing~|~19276D13C39EDEB8737BF6C76A3E1A91ECEE3A6F 94257~|~1~|~1~|~01/STR~|~"01/STR/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Installation of turn lanes and signal on Per-SR 13-32.45 to 32.65~|~04 - Reconstruction - No Added Capacity~|~ADB3E7766686D2EA421C12A28044C59A50F78E3B 94257~|~1~|~2~|~02/NFA~|~"02/NFA/PV/ " - District Preservation 4PS7(100% State) - No CAP - Realignment of Per-TR 37-01.04 to 01.06~|~04 - Reconstruction - No Added Capacity~|~E637966CFCCD9BFD03A2E5239B93A9B3A6306160 117321~|~1~|~1~|~01/ENH~|~Sidewalk reconstruction and street light upgrades on Main Street in the City of Logan. Total length of work 0.39 miles. TAP funded. Funded 95% Federal/5% Local.~|~28 - Facilities for Pedestrians & Bicycles~|~E65E7DA1B80AB51907F8ED497AB608DCF5C3413E 121365~|~1~|~1~|~01/BRO~|~Rehabilitate bridge carrying SR 170 over North Fork Little Beaver Creek.~|~13 - Bridge Rehabilitation~|~5D408724143E6DFD18C218266D6159EB2A89A63D 85288~|~1~|~1~|~01/SAF~|~LUC-475 from SLM 4.51 to SLM 4.75~|~05 - 4R Maintenance - Resurfacing~|~C92E5161E94F318CF28179F4EF104C1E21E9D602 120740~|~1~|~1~|~01/BRO~|~Repair bridge carrying US 40 over Wheeling Creek, CR-10 and Abandoned Railroad.~|~13 - Bridge Rehabilitation~|~1E5FBEE75B6808A95F4D923E3EACABC2916F7416 113027~|~1~|~1~|~01/IMS~|~Split for pavement work~|~05 - 4R Maintenance - Resurfacing~|~0F9077DECD1874982BCD0067C47D0D0093CAB26D 108556~|~1~|~1~|~01/BRO~|~Plan Split to program project. Update at scope complete.~|~13 - Bridge Rehabilitation~|~2F8B79EC73B3E7CD30B888F89483155F41C9E02E 84577~|~1~|~1~|~01/BRO~|~The split is for work eligible for the use of federal BR funds.~|~13 - Bridge Rehabilitation~|~79D5020E37493DBA49CD1A5C8B1B3649054AD713 77537~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~E1554DF8D99F7B63DF418EF72E43C4BCECB1B689 77537~|~1~|~2~|~02/NHS~|~Bridge work to be determined~|~13 - Bridge Rehabilitation~|~C22F1E22CAC69E94E33D507D9E097FF47748DED0 77537~|~1~|~3~|~03/SAF~|~Split 3/1 is additional costs for wet reflective optics and Grooving (100% 4HJ7) and split 3/2 to cover the remaining pavement marking costs (4PF7/4PS7)~|~21 - Safety~|~F889426E210F8C5E97ABAB3F221003FC74544FD7 100298~|~1~|~2~|~02/S<2~|~Microsurfacing of MAH SR 14 8.02 to 9.02.~|~05 - 4R Maintenance - Resurfacing~|~B896CCAD9F0D3BA7C19BA0144F4BC48228F90653 100298~|~1~|~3~|~03/S<2/SALE~|~Microsurfacing of MAH SR 14 from 7.92 to 8.02, Urban Paving in the City of Salem.~|~05 - 4R Maintenance - Resurfacing~|~71714BB16EA4583E4983D28175147BEE11AA46AB 100298~|~1~|~1~|~01/STR~|~Microsurfacing of MAH SR 14 0.00 to 7.92, POR SR 44 24.19 to 26.76, POR SR 82 5.06 to 9.13, POR SR 225 0.00 to 2.53~|~05 - 4R Maintenance - Resurfacing~|~48A6CF4A29B8DEAE58A4D9508F0624A94BAB25A1 108311~|~1~|~1~|~01/IMS~|~OH18-01 ER event. Landslide repair on NOB 77 7.90, DSR NOB-004. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~4905233D3AF9E49A7186A5F7E81D0DA977185C87 108311~|~1~|~2~|~02/STR~|~OH18-01 ER event. Landslide repair on NOB 145 8.80, DSR NOB-001. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FDCB6A746B4B61D81D738E30778A7D075E13F02D 108311~|~1~|~3~|~03/NHS~|~OH18-01 ER Event. Landslide repair on WAS 50 4.30, DSR WAS-003. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~106B680ED07FB3B34A3DC2D7210C7C7374019752 108311~|~1~|~6~|~06/STR~|~OH18-01 ER Event. Landslide repair on WAS 821 10.22, DSR WAS-006. Funded 100% federal.~|~17 - Construction Engineering~|~CE8BE048193A6F6EC4191F76D20DCE359C8BAD50 108311~|~1~|~7~|~07/IMS~|~OH18-01 ER event. Landslide repair on WAS 77 15.37 NB, DSR WAS-008. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~EC0F156BE5D8B9D4844EADF9210F33AA008DAB1C 108311~|~1~|~4~|~04/STR~|~OH18-01 ER Event. Landslide repair on WAS 550 3.98-3.995, DSR WAS-005. Funded 100% federal.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F1D2EC3E1C6E81532E9E217DBAE56A542C3A13F4 108311~|~1~|~5~|~05/STR~|~Landslide repair on WAS 550 3.995-4.01. Funded 80 federal/20 state non-ER funds.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D1AF014ACC0458769935383F132EE1AD2E673120 126586~|~1~|~1~|~01/BRO~|~Replace bridge carrying SR 212 over Conotton Creek.~|~10 - Bridge Replacement~|~0B494F8E92D0BC687B34DB5538417A21E4A95F95 125662~|~1~|~1~|~01/STR~|~Plan split for the rural sections~|~05 - 4R Maintenance - Resurfacing~|~B4C7088AE0EC748E5B2DE11E24F04ACEF358503D 85358~|~1~|~1~|~01/NHS~|~80/20 state/local funding split for the urban paving eligible portion of the project.~|~05 - 4R Maintenance - Resurfacing~|~579A5D154BC558A7057F5A6AD5083A023A2495E9 85358~|~1~|~2~|~02/NHS~|~100% local funding split.~|~05 - 4R Maintenance - Resurfacing~|~5EC644CB70B358C211A6250703036D04436A3003 95507~|~1~|~1~|~01/STR~|~"01/STP/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on 1) Kno-SR 229-11.12 to 25.38; 2) Cos-SR 229-00.00 to 00.70;~|~~|~978B762A06D6C767D7E1637BA86D24F06A76949C 95507~|~1~|~2~|~02/S<2/MTVN~|~"02/S<2/PV/MTVN " - District Preservation 4PF7(80% Federal) / 4BG7(20% Local) - No CAP - Resurfacing on Kno-SR 229-09.51 to 11.12~|~~|~D598883D2EDC26AAC3236D8F469EEC03914F2375 86941~|~1~|~4~|~04/NHS/WARR~|~80/20 Urban Paving work on US-422 from Ridge Road to North Road, in the City of Warren, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~2B6CACCA341B25D06594D3CE1C5BEA9C11E2FD3D 86941~|~1~|~2~|~02/S>2~|~Plan Split for SFN 7807074 TRU US 422 12.85 under Bike Trail~|~13 - Bridge Rehabilitation~|~7BB9DD6ED8E917212268E381E2CF2E91FE165BAB 86941~|~1~|~3~|~03/S>2~|~Resurfacing of TRU SR-169 from 1.87 to 3.41 in Howland and Weathersfield Townships, Trumbull County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~9FFDF035366E998A9123C80852333DA538EBCC61 86941~|~1~|~1~|~01/BRO~|~Plan Split for BR Eligible SFN 7807066 TRU US 422 12.55 over Norfolk Southen RR~|~13 - Bridge Rehabilitation~|~CEFC1A5AE533CBEEC2923386811DCC98A4590104 86941~|~1~|~5~|~05/NHS/WARR~|~100% City Items on US-422 from SR-169 to Laird Ave and Ridge Road to North Road, in the City of Warren, Trumbull County, Ohio.~|~44 - Other~|~E4F16509FB868318B97DCFDBDACFB3CDB8A9A5B4 88206~|~1~|~1~|~01/NHS~|~On US 27 from 4.22 to 4.27 (Near Kirchling) Stabilize Indian Creek along US27 that is meandering/eroding towards US27.~|~04 - Reconstruction - No Added Capacity~|~8B0B2E687A35998BFAF6D7B784141B730E072885 97654~|~1~|~1~|~01/NFP~|~Construct new Washington County Full Service Facility. Funded 100% state.~|~44 - Other~|~BDAE4B3E3935FF597E1B888495B30704776AE0EF 87209~|~1~|~1~|~01/S>2~|~US 42: From 0.92mi to 0.88mi south of SR 741 intersection. Replace bridge WAR-42-0348 SFN 8300488 over a tributary to Muddy Creek in Mason. The existing bridge is a 4 sided CIP box with a span of 15'.~|~04 - Reconstruction - No Added Capacity~|~C1FE9DEC8567CC70DA6C5BFDF4118D3BF0FFA177 87209~|~1~|~2~|~02/S>2~|~Replace bridge WAR-42-0348 over a tributary to Muddy Creek in Mason. The existing bridge is a 4 sided CIP box with a span of 15'. SFN 8300488. This Plan Split is for the GCWW work included in the project.~|~43 - Utilities~|~C3A783296F03EE72BAA6845A50DE9B139EB7F1A0 105750~|~1~|~1~|~01/NHS~|~WAY-30-11.79 to 19.45 Concrete repairs in EB Concrete Lanes Only.~|~05 - 4R Maintenance - Resurfacing~|~72AC31CD2B34A18805BC0B19148D5C94FC2B6C50 105750~|~1~|~2~|~02/NHS~|~Deck Sealing on 3 mainline bridges as part of concrete repair project~|~47 - Bridge Preventive Maintenance~|~BCF351EAF727F4A3BE35699127C67EF5FFFEF1FC 107778~|~1~|~1~|~01/NFA~|~Landslide repair project. NOB 260 6.80-6.95. Minor Collector Route. Funded 100% state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~211CD24D77517A4EFCC195FC1B188954DE92A50B 116966~|~1~|~1~|~01/S>2~|~Reconstruction including road diet from 5-lanes to 3-lanes~|~04 - Reconstruction - No Added Capacity~|~BE66E54D13B3E1629BE84E3745F14D703F0E7CF7 107644~|~1~|~1~|~01/STR~|~SCI 335 10.31 (SFN 7305109)~|~10 - Bridge Replacement~|~13EC2372AEAA60F5BC7FE800A983D28904EAF11E 121441~|~1~|~1~|~01/SAF~|~General Guardrail System FY 2030~|~21 - Safety~|~2787F199AC7EDB1D269BA3627551A58908E91C75 127149~|~1~|~1~|~01/S>2~|~Plan Split for eligible urban paving items~|~05 - 4R Maintenance - Resurfacing~|~0D1A668B6E2B79085902FF7947C0968CD6DFE4D8 127149~|~1~|~2~|~02/S>2~|~Plan split for resurfacing the general system in Village of Kirtland Hills using district funding~|~05 - 4R Maintenance - Resurfacing~|~2B8738B623D7A9B5379A4E30D4C31F457B6F976C 127149~|~1~|~3~|~03/S>2~|~Plan split for 100% local share work items not eligible for Urban Paving funding~|~05 - 4R Maintenance - Resurfacing~|~0122356C69147B64C0BAF34CB87633D15833E576 86998~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay. MEG 124 47.36-62.33. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~33986A77D11DE0D160AA70CEDAB285C4150F8956 118796~|~1~|~1~|~01/SAF~|~Pavement marking project on various routes and sections in MOE County. Funded 100% Federal.~|~21 - Safety~|~58FF51521CB2E84F1396B315EE319DD7F0A2DB0A 94173~|~1~|~1~|~01/NHS~|~Repair existing CMP access tunnel JEF-7-0349 (SFN 4100131) by replacing the existing asphalt paved invert with a reinforced concrete paved invert.~|~04 - Reconstruction - No Added Capacity~|~A127B5998629C5042E6D2C6A53C2DD710C5BA532 125674~|~1~|~1~|~01/STR~|~Plan split for the resurfacing on the rural section ~|~05 - 4R Maintenance - Resurfacing~|~755C33CA670BD1E211EF1D396B64FD45DA565016 121180~|~1~|~1~|~01/STR~|~Horizontal and vertical curve correction. HOC 664 13.03.~|~21 - Safety~|~0392C55C790893286F0C995EF217D2AE2C0B54A0 108598~|~1~|~1~|~01/NFP~|~The CITY will construct a new access road from the existing curb cut on SR-235 E. Xenia Drive to the north approx. 766 linear feet and terminating in a cul-de-sac or other appropriate configuration.~|~01 - New Construction~|~454EF7F59C6A4F0C706B81C02FDAF8DC9BB613A1 105042~|~1~|~1~|~01/BRF~|~Bridge replacement Elizabeth St over Norfolk Southern in East Liverpool with 80% Municipal Bridge/15% TRC/5% Local funds.~|~10 - Bridge Replacement~|~0E10E981EA238B34A7FA4C69C73C79B32D4CCC32 99065~|~1~|~1~|~01/STR~|~Apply herbicides along roadside for weed control on 4 lane - MIA/SHE/AUG/MER/DAR/LOG.~|~44 - Other~|~46F8AEDA73F9113542F00D3AF47196521FFD4BBC 116981~|~1~|~1~|~01/S>2~|~Split for bridge retaining wall work~|~66 - Resilience Improvement - Highway Project ~|~CD48DE40F9037FEC1AD870FD8B55002C207EA288 101989~|~1~|~1~|~01/NFP~|~Pavement markings on various routes throughout Portage, Stark, and Summit Counties.~|~21 - Safety~|~215132838A5620619940AB0E8A96E16EEBBD5DCD 113025~|~1~|~1~|~01/NFP~|~All work is in this split using 100% state funds from the District Preservation Program SAC 4PS7.~|~21 - Safety~|~AB69EE130476477F6EDBA9FA562D5E1E07E506C1 96874~|~1~|~1~|~01/NFP~|~District wide pavement marking plan for long line markings for FY 18.~|~21 - Safety~|~C00A08F63C70C663FCD57914837A1F86EE4DD90C 95842~|~1~|~1~|~01/S<2~|~Roadway reconstruction including curb, sidewalk, concrete base, asphalt pavement, storm sewer, street lighting, landscaping and street amentities at Springfield Street from East Third Street to Findley Street.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7C8A989F38E2013D4C75A92C33AABD9B0FC2D4BA 120754~|~1~|~1~|~01/MPO~|~Plan split to construct a multi-use path Earmark and NOACA Transportation Alternative Funding~|~28 - Facilities for Pedestrians & Bicycles~|~E5DAAFD31D0CD2DA470F9201C6D455113715A5B4 101645~|~1~|~1~|~01/STR~|~Culvert Replacement: CRA-103-12.35~|~44 - Other~|~55AA5E68A2190286669455A525A33D529579ECF5 91103~|~1~|~1~|~01/NHS~|~District Allocation - 80/20~|~05 - 4R Maintenance - Resurfacing~|~9424FF9A0A6F0EB387CE5CADB533F790F8928044 79580~|~1~|~1~|~01/IMS~|~Split for structures eligible for BR funding: 1807986, 1808044~|~10 - Bridge Replacement~|~2B0926F8CF5EF784977DC3094663B494AA6775C0 79580~|~1~|~2~|~02/IMS~|~Split for structures not eligible for BR funding: 1807927, 1807951~|~10 - Bridge Replacement~|~5366B3C910BA80C6847B1BFAA29BE573439FB822 113065~|~1~|~1~|~01/S>2~|~AC overlay with repairs on: HAM SR 264 SLM 0.00 to 1.08~|~05 - 4R Maintenance - Resurfacing~|~CFA74A767FA1C4A5BEE64877DE68727B37F583FF 117215~|~1~|~1~|~01/SAF~|~Lighting at MED IR 0076 and SR 0261.~|~21 - Safety~|~B27665228A4C5A2CA59FF55E1A084041DD13F1E9 89275~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~~|~A05164EB104556EB106E984649C2FE4F213B5959 97730~|~1~|~1~|~01/NFA~|~Widening the turn lane in front of the expanding facility on Tussing Road.~|~44 - Other~|~D4D0148FA8548C0ED50102008668F9429ED0F76E 124148~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~0DB9BC09ED53B016326FDF755710CD838F0DEF7A 95655~|~1~|~1~|~01/NFP~|~Remove fuel storage tanks~|~44 - Other~|~F8ECFFBE5FD7BB81861FA1744C504489398CB404 92820~|~1~|~2~|~02/BRO~|~Waterline relocation at the City's expense in conjunction with the project.~|~10 - Bridge Replacement~|~4A3C9F058B910A42CF94EEA94ABF8F9AC2A7E6FB 92820~|~1~|~1~|~01/BRO~|~Remove and replace 3 span continuous concrete slab deck bridge with minimal approach work. NOTE: Sidewalks are box beams on outside of structure, not attached excep at abutment. SFN 8709601 MOT SR 202 7.00~|~10 - Bridge Replacement~|~BEFD8A2E86701F4CCD814E0E1719193328F1639B 115494~|~1~|~1~|~01/NFP~|~District wide crack sealing. ~|~99 - State Preventative Maintenance~|~94C335BAB79FC16EFA09466C4D29658479873F3E 99410~|~1~|~1~|~01/BRO~|~See linked structures > 20'~|~10 - Bridge Replacement~|~FDB811A892FD0D2043FB4446AC2FCD11841F6D53 99410~|~1~|~2~|~02/STR~|~See linked structure between 10' to 20'.~|~10 - Bridge Replacement~|~5E32AB5F1294EC15D96882F2DFC139030BCA89BD 109564~|~1~|~1~|~01/SAF~|~To provide a maintenance contract to maintain the highway lighting system for roadway and sign lighting on the state maintained highway system throughout District 11.~|~21 - Safety~|~BDE585B211E60A7D150BF132B54DF6E50130A230 94427~|~1~|~1~|~01/STR~|~Two Lane Resurfacing on Federal Aid System~|~05 - 4R Maintenance - Resurfacing~|~B10ABBA5FEE4BC1C3588C479D12462CCDB0C7553 94427~|~1~|~2~|~02/NFA~|~Two Lane Resurfacing Not on Federal Aid System (WAY-604-4.17 to 7.56)~|~05 - 4R Maintenance - Resurfacing~|~EBC4BF4E63AF1CB8784434C9C05EAFD62327FBA3 101767~|~1~|~1~|~01/BRO~|~Replace existing bridge carrying SR 800 over Muskrat Run with new structure.~|~10 - Bridge Replacement~|~0084EEFE4B3CBA37A11BB6189B115ECD0103532D 114907~|~1~|~1~|~01/STR~|~Pave culvert invert on WAS 339 6.66, CFN 1885599.~|~04 - Reconstruction - No Added Capacity~|~4FBE86AB292EA189C6C7C42E20679054A56FB152 114907~|~1~|~2~|~02/IMS~|~Pave culvert invert on NOB 77 12.91, CFN 1875681.~|~04 - Reconstruction - No Added Capacity~|~3007BCFFF2F3D84FF8DD1E0293E1F25670EBA9CA 123956~|~1~|~1~|~01/NHS~|~geotech plan split.~|~04 - Reconstruction - No Added Capacity~|~9EBBF8DB153E1B1563A8A2C308E29F7725B4A2F6 112277~|~1~|~1~|~01/STR~|~Bridge replacement project. WAS 339 8.64, SFN 8404143. Rural other federal aid funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~BD61B1E4276D229822D8DDB7BB056AE8247C2CD9 125458~|~1~|~1~|~01/NFP~|~block PID~|~44 - Other~|~E4D14434DE8DB5EAA6C72D12E4AA155455FD4BFD 98695~|~1~|~3~|~03/NFP~|~100% Local Items~|~01 - New Construction~|~043B84E5607EE4DBD630427F3EF51593F940F714 98695~|~1~|~2~|~02/TRN~|~Extend the GCRTA rapid station platform.~|~01 - New Construction~|~1D0568A5AC6CBC9DF2E59347472B9545FDA71887 98695~|~1~|~1~|~01/S>2~|~Construction of Section 2A from East 93rd Street to Quebec Ave~|~01 - New Construction~|~4263CC677B1423757EB3148915CC9E2A1B4E13C7 95116~|~1~|~1~|~01/NFA~|~Roadway width will be widened to include two 11' lanes and paving the shoulder on each side. Improvements will include drainage, guardrail, signage, resurfacing and pavement marking. Total lenth of project 0.35 miles at the intersection of Millcreek Rd (Twp 342) and Colegate Drive. Funded 100% federal.~|~21 - Safety~|~A781D8C880108EB2B2E28709C54CA0BD330F92E5 100080~|~1~|~1~|~01/STR~|~Bridge Repairs:MED-IR-271 01.460 SFN 5207177 OVER MED-271 -0149L Preventive Maintenance ? Slope repair & protection install (082) MED-IR-271 01.480 SFN 5207193 OVER MED-271 -0157R Preventive Maintenance ? Slope repair & protection install (082) MED-IR-271 05.260 SFN 5207320 OVER MED-271 -0526 Preventive Maintenance ? Slope repair & protection install (082) MED-IR-271 05.900 SFN 5207266 TRIB.OF E.BR.ROCKY RIVER Preventive Maintenance ? Scour prevention and correction (083) Minor Rehabilitation ? Culvert invert repair (120)~|~13 - Bridge Rehabilitation~|~D1A31657A9E2BAED4BDF6D126F2C056BB94CECE8 103511~|~1~|~1~|~01/NHS~|~DSR HAS-001~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~D1258C1B8AF0B2F083BF31EEE49ABBA73697FF00 89057~|~1~|~1~|~01/MPO~|~80% federal / 20% local split using MPO Enhancment funds.~|~28 - Facilities for Pedestrians & Bicycles~|~6BBFE4DB29C80AB70262D92E99B6C7256656077B 122126~|~1~|~1~|~01/NHS~|~Slide repair.~|~~|~1D79EBFEF2D6C51B9AE6C7854A95190912985E6E 116326~|~1~|~1~|~01/NHS~|~Plan Split for resurfacing on GRE-844~|~05 - 4R Maintenance - Resurfacing~|~821A9092B462410F1B5CE4EA6514DD9605A11618 105862~|~1~|~1~|~01/IMS~|~Added plan split~|~44 - Other~|~524BEAAAE079A85A1A2236237EED865B19AC2387 105529~|~1~|~2~|~02/S<2~|~London urban paving plan split: MAD-142-2.40-2.94~|~05 - 4R Maintenance - Resurfacing~|~06DCDA9936F3CE23E00ABAA185A81F7AE5AC708A 105529~|~1~|~1~|~01/STR~|~Rural plan split for MAD-142-2.94 to 10.14~|~05 - 4R Maintenance - Resurfacing~|~DF480DB291C6EC97AE05BA82B0B9044325CA6F38 109643~|~1~|~1~|~01/S>2~|~The CITY will construct improvements to Reed Hartman Highway including but not limited to adding a northbound lane from P&G Drive to the Kemper drop lane, upgrading intersections at P&G Drive and a north access drive, upgrading the intersection of Cornell Rd. and Williamson, and other public improvements as recommended by a Traffic Impact Study to be completed~|~04 - Reconstruction - No Added Capacity~|~2EC76351AAB30B0C64A621F11FDC24EF65CF7DEE 114518~|~1~|~1~|~01/S<2~|~Bridge replacement.~|~10 - Bridge Replacement~|~B81DFBBB83A887030A10BA5F92E1BF0C946A2CE0 121863~|~1~|~1~|~01/MPO/CUYF~|~Pavement reconstruction.~|~04 - Reconstruction - No Added Capacity~|~EFF61D5FAF716575B6AD2B9B5FE5AA6973584911 102734~|~1~|~1~|~01/S5K/ALLI~|~Resurfacing, in the City of Alliance.~|~05 - 4R Maintenance - Resurfacing~|~387ADEB306F92CE579E501A7B431984F682F53EB 102734~|~1~|~2~|~02/S5K/ALLI~|~100% local items including ADA curb ramps and full and partial depth repairs.~|~04 - Reconstruction - No Added Capacity~|~0374534E9278E10C3C145DC20C98FF1A8B6900D2 122038~|~1~|~1~|~01/NHS~|~Remove orphan railroad bridge superstructure~|~40 - Special Bridge~|~E1152B3848AC9C7EF1925FA1470B29CBDBFC24ED 97989~|~1~|~2~|~02/STR~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-US 22-19.78 to 26.62~|~05 - 4R Maintenance - Resurfacing~|~EE1337549862C7EB351613EEFCF36BAB6C6133DD 97989~|~1~|~1~|~01/S<2~|~District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Mus-US 22-18.14 to 19.78~|~05 - 4R Maintenance - Resurfacing~|~2FB824707E26FFC867081173198E46F63BCB6909 93783~|~1~|~1~|~01/S<2/ADA~|~01/S<2/PV/ ; HAR-Ada Klingler Rd., 80% Fed (4B97) - 20% Local (LNTP).~|~04 - Reconstruction - No Added Capacity~|~56608F317FD4BF105346F94BD406B6ACAC65773D 93783~|~1~|~2~|~02/NFP/ADA~|~Work not eligible to be funded by the Small Cities Program. All funds provided by the Village of Ada. Water line work including water main, gate valve and fire hydrant.~|~43 - Utilities~|~BD5E147DD500F3E20FE5881E32D2C3110AC18C0E 117046~|~1~|~1~|~01/STR~|~All work in this project.~|~04 - Reconstruction - No Added Capacity~|~BE9805F69442C5F6F82EAC7AF9EED1182A1172BF 112419~|~1~|~1~|~01/IMS~|~Fine poly AC overlay~|~05 - 4R Maintenance - Resurfacing~|~EB2FA0833A9041B9CF0BCD82B277E21217AEB114 101254~|~1~|~1~|~01/NFP~|~District Preservation Funding - 4PS7 (100% State) - No CAP - District Wide Guardrail Ding N Dent~|~21 - Safety~|~B536335982DB680FEC75B6D3C2970F318ED3C4B8 123630~|~1~|~1~|~01/IMS~|~Plan Split for Interstate~|~05 - 4R Maintenance - Resurfacing~|~7BA402EE65E168E65966F76B0E73520FBF327ECF 103812~|~1~|~1~|~01/BRF~|~Replacement of SFN4930649~|~10 - Bridge Replacement~|~D86F25210F6EB9EF0A6D1D8EBBC1A2B5C46D633B 102755~|~1~|~1~|~01/S>2/WARR~|~Concrete pavement repair of TRU US 422 from 12.42 to 13.03, urban paving in the city of Warren.~|~~|~05C2BD638A5B6B05715252298A784AF269D6712E 102755~|~1~|~2~|~02/S>2~|~Minor bridge work span > 20'.~|~~|~97C92D82ACC6A84A1166D4234328E1C262053248 88805~|~1~|~1~|~01/STR~|~District Allocation~|~05 - 4R Maintenance - Resurfacing~|~195A1A92B3F35DC8FA3B8744B2F671762EC8F638 120667~|~1~|~1~|~01/MPO~|~Split for MPO eligible resurfacing items~|~~|~989AB645ABF677A80CC1B3368B34FCC4D71A0A82 94681~|~1~|~1~|~01/S>2~|~80% federal / 20% local funding split using MPO STP funds to resurface Van Aken Boulevard.~|~05 - 4R Maintenance - Resurfacing~|~D8C97B6D53828CC14A9A4AA31FA680C88BEC59E6 93682~|~1~|~1~|~01/STR~|~Replace existing culvert on SR-269 in Ottawa County near R-163. CFN -1836409~|~04 - Reconstruction - No Added Capacity~|~EBE981708DBC5D228874509D011639AFEF6DCB05 97515~|~1~|~1~|~01/NFA/MCEO~|~"01/NFA/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 31-W292(Rural Dale Road) SFN 6030106 - Currently Not BR Eligible for replacement: L=28'; SD/FO=0; SR=99.8; DSR=N; Original ratings before county repair: BR Eligible for replacement: L=28'; SD/FO=1; SR=55.6; DSR=7;~|~10 - Bridge Replacement~|~E44989235E5197B618127DA99D25429C86B9FFF2 97515~|~2~|~2~|~02/BRF/MCEO~|~"02/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 71-W292(Coopermill Road) SFN 6038220 - BR Eligible for replacement: L=109'; SD/FO=1; SR=20.9; DSR=7;~|~10 - Bridge Replacement~|~789E0B5242866E65D9070F8BC739B2BA805C1D08 97515~|~3~|~3~|~03/BRF/MCEO~|~"03/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 301-00.02(Moore Road) SFN 6044336 - BR Eligible for replacement: L=107'; SD/FO=1; SR=34.2; DSR=4~|~10 - Bridge Replacement~|~DE83A0C22D631FD1428AA7A35BEFB04BFCF97149 97515~|~4~|~4~|~04/BRF/MCEO~|~"04/BRF/BR/MCEO" - County Ohio Bridge Partnership Program Funding 7BP7 (100% Federal Bonds) - No CAP ? MUS-CR 38-S481 (Hamby Hill Road) SFN 6043143 - BR Eligible for replacement: L=64'; SD/FO=1; SR=20.9; DSR=7~|~10 - Bridge Replacement~|~55D2163FBF424EDEF0810BD62AC1FCE10DB0C953 91259~|~1~|~1~|~01/STR~|~On SR141, begin project 2.52 miles north east of CR8 (Symmes Creek Road). It is proposed to repair the slip. Fed Dec. #OH11-02. 80%fed/20%state~|~44 - Other~|~2EDE0473DB0D9F72B18A81001F6F86C885671568 111659~|~1~|~1~|~01/SAF~|~Install left turn lanes and upgrade the signal on US-127 and close or define access points along SR-725 in the Village of Camden~|~21 - Safety~|~501AE9DF58F860D748CBE1BA64039F7A78D9D864 96002~|~1~|~1~|~01/S<2~|~100% federal funding for signal work~|~22 - Rail/Highway crossing~|~23D19DF61B743BA71564E3D3CF21CD2CA69A3462 98694~|~1~|~1~|~01/CMQ~|~Widening McClurg Road from State Route 7 to Todd Avenue, in Boardman Township, Mahoning County, Ohio.~|~03 - Reconstruction - Added Capacity~|~F23A72E00A0B9A8404C938922D8FB1C234A873AE 103721~|~1~|~1~|~01/NHS~|~Install a Restricted Crossing U-Turn Intersection (RCUT) to completely remove the median opening at the intersection of Butterbridge Road.~|~21 - Safety~|~114E344855FA70D3DED822B8D96703777EC927B8 103721~|~1~|~3~|~03/NHS~|~Replacing the linked culvert.~|~04 - Reconstruction - No Added Capacity~|~F8D4CA4C8BB8AAD9E6D4ECC1D9F3DEFF3C1DC117 103721~|~1~|~2~|~02/NHS~|~Widening of the two linked structures > 20' span.~|~21 - Safety~|~239DFDD2D702628716558628BF636F24F4CE5362 114157~|~1~|~1~|~01/STR~|~Guardrail upgrade/replacement project for FY2027. Various routes and sections in D10.~|~21 - Safety~|~5D48C8BF6B9B93328FDE3B69F9F41B431F21370C 114157~|~1~|~2~|~02/S50~|~Guardrail upgrade/replacement project for FY2027. Various routes and sections in D10.~|~21 - Safety~|~E575F563FA16F6E1DD16C48A275E4ED7724B6AC3 114157~|~1~|~3~|~03/S5K~|~Guardrail upgrade/replacement project for FY2027. Various routes and sections in D10.~|~21 - Safety~|~525BC731B6329A14E99388D241DB08C47D3A8272 114157~|~1~|~4~|~04/NFA~|~Guardrail upgrade/replacement project for FY2027. Various routes and sections in D10.~|~21 - Safety~|~2F196D7A8AB72E71F94B4F705A849F5D4E81480F 95785~|~1~|~1~|~01/STR~|~from SLM 13.25 to SLM 17.64~|~05 - 4R Maintenance - Resurfacing~|~5E1BF9BC31D828FEF505B67A4BD698342542D94A 117431~|~1~|~1~|~01/MPO/TRCE~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~3CAFA4AFF4FE4D039B8C25C6F8B70EA256C398E7 108025~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~4F1E7CDE1F0D093CA7C952B40A73DFAA899FB2A6 123570~|~1~|~1~|~01/SAE~|~Replacing R-W/R striping~|~21 - Safety~|~F22E8087D99E997CD8D46327A94070EE4DE1D7CD 114513~|~1~|~1~|~01/STR~|~Resurfacing on the rural section of CLI-68~|~05 - 4R Maintenance - Resurfacing~|~82B87297B422B1FB7758CDBD8DF582DA15270691 114513~|~1~|~2~|~02/S5K~|~Resurfacing on the small urban section of CLI-68~|~05 - 4R Maintenance - Resurfacing~|~C02965148AD9997835492053EF308590D6CFA7A1 107209~|~1~|~1~|~01/ENH~|~Sidewalk improvement along 5th Ave in the City of Youngstown.~|~~|~FA9B488346A171B8A13DA159F6D4E2E1ADC4FC67 91857~|~1~|~1~|~01/BRO~|~"01/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 4203720 KNO SR661 2.98 Intersect: Sycamore Creek; BR Eligible for Replacement: Length=93 SD/FO(1) SR=54.4 DSR=4~|~10 - Bridge Replacement~|~071877B4C77C26E260382736ABC30B7687D992D7 125704~|~1~|~1~|~01/NFA~|~Resurfacing SR 520 from SLM 0.00 to 5.32, and from SLM 5.40 to 12.51~|~05 - 4R Maintenance - Resurfacing~|~CB62E33E419A01ABD410A3C651F6A9958A74A3DB 125704~|~1~|~2~|~02/STR~|~Resurfacing SR 520 from SLM 5.32 to 5.40, and from SLM 12.51 to 13.47 (US 62)~|~05 - 4R Maintenance - Resurfacing~|~3B6EA25B86323284D912EC607885CFA10CDF8D08 86824~|~1~|~1~|~01/BRO~|~80/20 fund split for federal BHF funds~|~~|~C7F00E02EB03392876DE5978683699A01D94EBA6 104712~|~1~|~1~|~01/CMQ~|~Upgrade and interconnect work at 95 signalized intersections in Clermont County, OH.~|~21 - Safety~|~D8E4831E8BA39151EFBA53282306CF67B4896490 122878~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~78397C07A256BDF82A89D5FC64DEFD0ACF1D5AD4 115599~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~~|~01873EF71644AB8BF2909A426928FC18E7DDCB65 115599~|~1~|~2~|~02/NFA~|~SIB Loan ~|~44 - Other~|~C852C9EC8D3D8CFE1076C9D28713D2B68899FAAA 97171~|~1~|~1~|~01/SAF~|~Safety/local funding for new signal and left turn lanes on SR-3 at Plumb Rd~|~~|~63BD7262AF2E3FBF34A434B9BCC9BE4A1F1AC8E2 85080~|~1~|~2~|~02/BRO/Sene~|~7440960 SEN CR592 11.68 Intersect: Branch Of Wolf Creek Lib~|~13 - Bridge Rehabilitation~|~5655C1863BF8CE94731AA85820436252DCA561E0 85080~|~1~|~1~|~01/BRF~|~Rehab 3 bridges:7436548 SEN CR12 1.45 Intersect: Silver Creek 7438109 SEN CR38 7.38 Intersect: Wolf Creek East Br~|~13 - Bridge Rehabilitation~|~84D2DCE6C6583F1BE14B832CA3DC232A0DCFAD84 105361~|~1~|~1~|~01/IMS~|~Smooth seal~|~05 - 4R Maintenance - Resurfacing~|~CA564AC92598B2FAEFAFBA149E778AB62263A949 121536~|~1~|~1~|~01/SAF~|~Fast Dry Pavement Markers~|~21 - Safety~|~9781149F9ACB4F3702508BC441E0FDB65B31062A 102355~|~1~|~1~|~01/NFP~|~Maintain the existing auxiliary pavement markings at various intersections, interchanges, railroad crossings and school zones throughout the district.~|~21 - Safety~|~674BFF9119FD49130039284C27D702C6210E1004 103583~|~1~|~1~|~01/NFP~|~Repair damaged beams on structure UNI-4-13.20~|~13 - Bridge Rehabilitation~|~3614DD07A179EDAEBA3BF572EF50151CB8B28D26 106429~|~1~|~1~|~01/BRF/ROSE~|~Village of Roseville Local Programs Municipal Bridge Funding - 4R87 (80% Federal) / TRC (15% 4BG7) / 4BG7 (5% Local) - See CAP Comments - Replacement of SFN 6433588: BR Eligible for Replacement; Length = 120; SD/FO (1); DSR = 5; SR = 32.5~|~10 - Bridge Replacement~|~EA354F11904F8F376358E8B078BD0B3357FF903E 111231~|~1~|~1~|~01/IMS~|~Culvert replacement/rehab~|~04 - Reconstruction - No Added Capacity~|~0669EB5E866E2C2B03426BFF0818BCEBFF68456A 79315~|~1~|~3~|~03/S>2~|~Federal/state funding for concrete deck overlay 317 over RRSFN 2516233, FRA-317-2.40, over CSX & NS RRDeck sealing-SFN 2516217, FRA-317-0.37, over Big Walnut Ck03/S>2/BR/~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~923F0898170C5410C13D97BE932BE2056BFC7EDC 79315~|~1~|~4~|~04/S>2~|~100% local (Columbus) funding for pavement repair04/S>2/PV/Col~|~05 - 4R Maintenance - Resurfacing~|~EC40A26493D0E35351C14362F4F32C4BF5B9316E 98109~|~1~|~1~|~01/S>2~|~Construction of a new roadway to connect Elmore Street, west of IR-74, to Central Parkway, east of IR-74 and near Cincinnati State Technical College, including construction of a structure crossing the Mill Creek and IR-74.~|~~|~DD637D6079729E47ED0CA093402327AFEC7C698C 124778~|~1~|~1~|~01/S>2~|~Replace bridge FRA-62-9.21~|~10 - Bridge Replacement~|~675EA9636BF3DB4270197F19B8A69B2FA0F47C30 94724~|~1~|~1~|~01/NHS~|~For SR-2 and Holland-Sylvania intersection~|~21 - Safety~|~1F0EC9EB0BF8ABF9E059EF6E541B9FC8DB002A03 84351~|~1~|~1~|~01/STR~|~Two-Lane resurfacing project using an asphalt overlay treatment. MOE SR 145 8.50-17.87. Federal 80% State 20% STP.~|~05 - 4R Maintenance - Resurfacing~|~813B43DDC45326856D6F742A87A4CA5813AB3FA1 115534~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~B05BE589DC230CF9C3757892AE5388D482D7F94B 122228~|~1~|~1~|~01/NFA~|~NEVI Round 2B IR-90-A~|~~|~F401D2D71E0995AE72A7B1BD238ED1FBC7744E39 96662~|~1~|~1~|~01/STR~|~Replace culverts: GRE-235-0244, GRE-235-0275, CLI-729-1611; various patching to CLI-68-0058~|~04 - Reconstruction - No Added Capacity~|~165A4B785F14368A894B3D3A3FAE2B19A707D585 125356~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~133DBE6333684DF2B7E5BE42FE4BB4B4D8ED5CE4 114323~|~1~|~1~|~01/STR~|~Bridge rehab.~|~13 - Bridge Rehabilitation~|~40301F7F30E1996E98B234C9744D0CF1E5D6FB19 93279~|~1~|~1~|~01/STR~|~District Preservation 4PF7(80% Federal) / 7BPB/4PS7(20% State) - See CAP comments - Rehabilitation on 1601024 COS SR 60 14.46 Intersect: Walhonding River; Not BR Eligible for Rehabilitation: Length=291 SD/FO(0) SR=76.2 DSR=5~|~13 - Bridge Rehabilitation~|~AB0FB28FC5B140B1EE2CA03B6DB4AAF61A8E750B 98160~|~1~|~1~|~01/S>2~|~The project consists of widening Kauffman Avenue (SR-444), from Euclid Avenue to Lindberg Drive, from 3 lanes to 4 lanes. Also replacement of the existing traffic signal at Kauffman and Garland with mast arms, repair of deteriorated sections of asphalt and concrete pavement, drainage improvements, storm culvert extension, and replacement of a section of the adjacent Wright Brothers Huffman Prairie Bikeway.~|~~|~71780504D5C2C474D0558163C902369F756F80A8 84632~|~1~|~1~|~01/STR~|~ADA SR41 25.21 - 34.46 Resurfacing Project On SR41, begin @ its intersection w/SR32, north east and terminate at the Highland Co. line (SLM 25.21 - 34.46), it is proposed to resurface the existing pavement with asphalt conrete All Brdgs are pave thru. 01011567, 29.81 01011443, 26.02 01011494, 27.72 01011540, 29.72 01011451, 26.75 80/20 split 01/STR/PV/State~|~05 - 4R Maintenance - Resurfacing~|~28DB4F85B780FAFCD8781170A3C298AD70982A90 125933~|~1~|~1~|~01/SAF~|~sign replacement in Hamilton Co~|~21 - Safety~|~44DF116796B67A2AB9BE11BA3AE3CD2426AEA1B9 83927~|~1~|~1~|~01/STR~|~Resurface the existing roadway along with other roadway related items on LOG SR 235 from SLM 8.18 to 17.43 segment length 9.25 total lane miles 18.50.~|~~|~5CA171323804BB4228379B573173EB5572B21145 83927~|~1~|~2~|~02/S<2~|~Resurface the existing roadway, along with other roadway related items on LOG SR 235 SLM 8.18 to 17.43 segment length 9.25 total lane miles 18.50.~|~~|~7B7D86DC4BFF73083456125DE07F984A90AEC71F 115364~|~1~|~1~|~01/ENH~|~Multi-use path funded by Safety and TAP funds~|~28 - Facilities for Pedestrians & Bicycles~|~FEFC726CD49F4E5AD0A563CE830EA485AE0F0896 87733~|~1~|~3~|~03/S<2~|~Microsurface the ixisting roadways as preventative maintenance New Bremen AUG SR 66 from SLM 4.58 to 5.35 (segment length 0.770 total lane miles 1.54) and ST Marys AUG SR 66 from SLM 10.29 to 10.67 (segment length 0.380 total lane miles 0.76)~|~05 - 4R Maintenance - Resurfacing~|~1B586673143838F1F56236272E0B059ABE397231 87733~|~1~|~2~|~02/NHS~|~Microsurface the existing roadway as preventative maintenance on LOG US 68 from SLM 2.28 to 5.70 (segment length 3.42 mile total lane miles 6.84) and on CHP US 68 from SLM 1.27 to 5.08 (segment length 3.81 total lane miles 8.42).~|~05 - 4R Maintenance - Resurfacing~|~1C9447E38D286D2F5F0DF0B4874CB3B86BF854BD 87733~|~1~|~1~|~01/STR~|~Microsurface the existing roadway as preventative maintenance on: MER SR 49 from SLM 5.10 to 13.93 (segment length 8.83 Mile total lane miles 17.65) SHE SR 29 from SLM 3.82 to 7.64 (segment length 3.82 total lane miles 7.64), and AUG SR 66 SLM 5.35 to 10.29 (segment length 4.94 total lane miles 9.88)~|~05 - 4R Maintenance - Resurfacing~|~A1404550BD01BD4D452E2AD6BDCB0373376AF2AF 117066~|~1~|~1~|~01/NHS~|~Added plan split.~|~21 - Safety~|~E35DC18C3BE52A7F515AB0530D95CA1DE3AC4C95 85035~|~1~|~1~|~01/NFA~|~Bridge replacement project. WAS CR 14 3.61, SFN 8431132. Replace an Ohio Bridge Single span truss on the existing location with a prestressed concrete box beam on new or rehabilitated abutments. Minor approach work will be required to adjust the road profile and width. 80% Federal, 15% Credit Bridge (Federal) and 5% Local.~|~10 - Bridge Replacement~|~DC85D0BE2DEC6244D17862896F8E931CDF46035E 119516~|~1~|~1~|~01/S>2~|~Widening of 1.3 miles of Cassady Avenue to 3-lanes from Plaza Properties Blvd to Agler Rd. ~|~04 - Reconstruction - No Added Capacity~|~2E1B3B78D3FE41952ED9B5FDA816426827CEC4A7 120400~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/PV Established~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~F0CE3E2FFC05BB56964295E33ECF93CB3FCD29C9 120916~|~1~|~1~|~01/BRO~|~Repair culvert type bridge carrying SR 172 over West Fork Little Beaver Creek by field paving the invert.~|~04 - Reconstruction - No Added Capacity~|~FBBA21103B36A45541EA8FFF6709DAD677707BC9 113933~|~1~|~1~|~01/S<2~|~Small City funded items- Pavement~|~04 - Reconstruction - No Added Capacity~|~F9C8A2EF348E1C732825FD3E55736D08B0555B2B 98670~|~1~|~1~|~01/STR~|~PIK TR 665 - 0.27 (SFN 6633439)~|~10 - Bridge Replacement~|~4CDC5AFD1BCE0E3F12B72532F26C578CD84D59C8 99217~|~1~|~1~|~01/NFA~|~Adding event for J&C Funding.~|~03 - Reconstruction - Added Capacity~|~63AF9EB83C6B91E835704DF0A52AB1B2E516F904 119090~|~1~|~1~|~01/BRF~|~CEAO LBR funding eligible work to replace the structure (bridge SFN 1830872). ~|~10 - Bridge Replacement~|~9FAF00601025E04E242D23C7935DCD4CF18D522A 117505~|~1~|~1~|~01/BRO/BCEO~|~Complete replacement of the existing bridge. Improvements to approach roadway including upgrades to guardrail.~|~10 - Bridge Replacement~|~A09135B4E0441CC37A2C40007134B9B7301F8560 93234~|~1~|~1~|~01/MPO~|~Add amenities (statues, plaques, lighting, etc) to the Salem Avenue Bridge over the Great Miami River.~|~31 - Landscaping & Other Scenic Beautification~|~D74C0D65463BB4754F88708E27C06203342DF0F0 113309~|~1~|~1~|~01/NHS~|~Signal reconstruction of FRA SR161 at Huntley/Sinclair~|~21 - Safety~|~4282C3F329B3B24648B45DE22A4E616A6AD5E427 115826~|~1~|~1~|~01/BRO~|~Split for eligible bridge work~|~13 - Bridge Rehabilitation~|~0C59CD8E10060EA54A30C61EC8957CFB60C8C9BC 115826~|~1~|~2~|~02/IMS~|~Plan Split for aesthetic bridges enhancements requested by the city beyond eligible project costs~|~13 - Bridge Rehabilitation~|~EC9D4A3EFC669B2B05279F5ACEE7DAFC6470B030 115826~|~1~|~3~|~03/IMS~|~Plan split for utility relocation costs that are not project eligible.~|~13 - Bridge Rehabilitation~|~E4C4FC767A0D2DC9EFBD4E7444BECE6F2944B72B 102682~|~1~|~1~|~01/NFP~|~Facilities special project. SAC LBP7 funds from Central Office.~|~44 - Other~|~FC89CD276C9982CA11426C9283E74442A0B30FA5 83899~|~1~|~1~|~01/STR~|~Resurface the existing roadway, along with other roadway related items. MIA-SR-185 0.000 to 7.82 MIA-SR-48 9.240 to 9.640~|~05 - 4R Maintenance - Resurfacing~|~7B63F3034AB84624B01228F11506FB570DFCA645 83899~|~1~|~2~|~02/S<2~|~Resurface the existing roadway, along with other roadway related items. MIA-SR-185 7.82 to 8.71.~|~05 - 4R Maintenance - Resurfacing~|~EB3DCFDA21847AA8A5F27517AF1AACA3A4A40644 119586~|~1~|~1~|~01/NHS~|~added plan split.~|~04 - Reconstruction - No Added Capacity~|~85417C5BA9F8F120BE420E34284188CCCFF8728B 105381~|~1~|~2~|~02/SAF~|~Wet reflective pavement markers.~|~21 - Safety~|~B6152FFC8464468714FF76B527DD0B9654939285 105381~|~1~|~1~|~01/IMS~|~AC overlay with repairs~|~05 - 4R Maintenance - Resurfacing~|~482C7FA0FE5EB65CC5520E3377DF8AAA0D0D2F39 105381~|~1~|~3~|~03/NFA~|~Retroactive fuel price adjustment~|~05 - 4R Maintenance - Resurfacing~|~8E48CABCEA89FF59D39342CA63DBBB932D1E7657 100581~|~1~|~1~|~01/STR~|~PIK 104 0.00-6.52~|~05 - 4R Maintenance - Resurfacing~|~73B59F45A6E7710995DEF46EBE1B68922ED80115 126336~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~A9AE846C1F9049B91CD3FE80ECA33C0FE3FD90F5 107532~|~1~|~1~|~01/NHS~|~Resurfacing COL-30~|~05 - 4R Maintenance - Resurfacing~|~E76D4C48E19D0C0361CE375D38045D902F55924B 110667~|~1~|~1~|~01/STR~|~All the work in the project is in this plan split. Uses state funds from the District Preservation Program budget.~|~05 - 4R Maintenance - Resurfacing~|~E68A868537B7C612140A9490063971F069B8A0D0 103002~|~1~|~1~|~01/NFA~|~Purchase order for asphalt paving of Racetrack Rd. at Friendship Park, Jefferson County.~|~44 - Other~|~324D50E7C07C007D9BAB397B368320E8F1DE7599 116175~|~1~|~1~|~01/SAF~|~Upgrade existing pavement markings on various county roads.~|~21 - Safety~|~CFF6F7BA47BC4A4E2F4EAE434FF316DD7AFC9486 113610~|~1~|~1~|~01/SAF~|~This project includes radar detection units to provide enhanced vehicle detection at 9 signalized intersections: SR 73 @ Sharts Rd/Greenwood Ln, Pioneer Blvd, Clearcreek Franklin Rd, and Springwood Rd. SR 741@ SR 73, Lytle-Five Points Rd, Remick Blvd, and Pennyroyal Rd. Stop bar radar detection is proposed for minor streets and major street left turn lanes (protected/permissive) and advance radar detection is proposed for arterial (SR 73, SR 741) and collector routes.~|~21 - Safety~|~56C7540C2BF3B41E50A9B3891A7762B24E4A07B9 120145~|~1~|~1~|~01/MPO~|~install electric Vehicle charging infrastructure at Civic Center Drive Complex Facility~|~~|~703E366F3ECD7405E4FDC0F1937AE4621BEE8BD7 100436~|~1~|~1~|~01/STR~|~HIG 135 0.00-2.82~|~05 - 4R Maintenance - Resurfacing~|~C431DF4AE9AB7D4138113B9F64A630A71B910873 100436~|~1~|~2~|~02/S<2~|~HIG 28 (15.43-16.92)~|~05 - 4R Maintenance - Resurfacing~|~4DC9EA8F75ACE3C7F2B6EB044D774E935F4F8559 100436~|~1~|~3~|~03/STR~|~HIG 135 2.40 (SFN3602761)~|~13 - Bridge Rehabilitation~|~B43A3382F6637A2595E9446748FAE319DDCF6E5D 100436~|~1~|~4~|~04/S<2~|~HIG 28 16.83 (SFN3600424)~|~47 - Bridge Preventive Maintenance~|~22A95FF76BB39D461EB0ACFA5D471E0F08073FE2 92155~|~1~|~1~|~01/IMS~|~100% 4CP7/ Maintenance Funds for one year Landscape Maintenance Contract~|~31 - Landscaping & Other Scenic Beautification~|~7A135928EB683D49C7ABDA9E47FCC1EF0C377A5D 115505~|~1~|~1~|~01/MPO/LOWE~|~Construct McGaffney St Extension, Phase 2~|~01 - New Construction~|~243CA37F01760BC46A5B18DCF54B1D434ADA908A 115505~|~1~|~2~|~02/MPO/LOWE~|~Construction of new culverts along McGaffney Road extension. ~|~01 - New Construction~|~09D68610410E21B93B8C22F6052AF38C925E696D 104695~|~1~|~1~|~01/S>2~|~Rebuild intersection in the City of Hamilton.~|~04 - Reconstruction - No Added Capacity~|~5C8C48569C36FB9EF4EF617E62EA26537268FFE5 93470~|~1~|~1~|~01/STR~|~Repair of deck edges, patching wing walls, refacing abutments, patching pier cap endas and encasing pier columns on SFN 1102613 CHP 296 0021 on Kings Creek, SFN 1102648 CHP 296 0122 on Kings Creek Tributary, SFN 1102672 CHP 296 0212 on Kings Creek, and SFN 1102737 CHP 296 0866 on Kings Creek~|~13 - Bridge Rehabilitation~|~29F9DEBFDC0EF2DFAD48DE168091AF1EE3CE26EF 97465~|~1~|~1~|~01/S<2~|~Landslide repair by installing a Hpile retaining wall. Type A emergency contract.~|~04 - Reconstruction - No Added Capacity~|~EF521BBAB7B8991C516F058D0D3F28140296DEFF 114985~|~1~|~1~|~01/NFA~|~Detailed plan splits will be addressed during design~|~47 - Bridge Preventive Maintenance~|~8242EF49461BE1F8CAD6C34D8EE11F4BA2EA9DF0 120112~|~1~|~1~|~01/SAF~|~Intersection improvement at SR 16 and York Road~|~21 - Safety~|~35B793004FC80EF0C8AB431CF8F769C057800E39 120112~|~1~|~2~|~02/NHS/LRWD~|~Sanitary sewer work for Licking Regional~|~~|~8B0AE79532F79BD0725719D2D0ACDA52674EF2CD 120112~|~1~|~3~|~03/NHS/PATA~|~Waterline work for city of Pataskala.~|~~|~58CACE2B27C74815A1387D349822F9D7425F9FEB 100905~|~1~|~1~|~01/STR~|~Overlay with asphalt concrete SR 66 in Auglaize County SUG SR 66 SLM 13.14 to 22.41~|~05 - 4R Maintenance - Resurfacing~|~A1C60FB1902BED771EB1DE1CCE50BCD7041B0E31 100905~|~1~|~2~|~02/S<2~|~Overlay with asphalt concrete SR 66 in Auglaize County AUG SR 66 12.50 to 13.14~|~05 - 4R Maintenance - Resurfacing~|~7C2FF97021CC1F46FFB1363BE30CDC0C2FAB21C7 119351~|~1~|~1~|~01/S>2~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~B991453C866A1B207C35655BFEB5B051B58A54EF 115377~|~1~|~1~|~01/NFP~|~Wet reflective pavement markings on various interstate and interstate look a likes throughout District 4.~|~~|~4440996FF16DC1C1731787B9657EE5AB70561255 112813~|~1~|~1~|~01/NHS~|~Resurfacing US 250~|~05 - 4R Maintenance - Resurfacing~|~BF311DA65211D7D77ED6BE21EE41747311EC259F 119338~|~1~|~1~|~01/STR~|~Plan Split for general system spot repairs~|~05 - 4R Maintenance - Resurfacing~|~7E418E766C5CCA05189DA158ABA19746E55C9F27 117971~|~1~|~1~|~01/NFP~|~Created for J&C involvement~|~44 - Other~|~A864AE80691B047D369D40F17763879F4EFFBC20 121577~|~1~|~1~|~01/S5K~|~Roadway improvements on Dresden Ave. utilizing Small City (4B97) Federal funds at 95%.~|~05 - 4R Maintenance - Resurfacing~|~ECC84F083E77E542624074FEA13F5B8B168948C3 5669~|~1~|~2~|~02/S>2~|~Urban pavement relocation~|~07 - 4R Maintenance - Relocation~|~87095B40C4F789A7E583A8242781E99D910EA276 5669~|~1~|~3~|~03/STR~|~Rural pavement relocation~|~07 - 4R Maintenance - Relocation~|~D19FD22E537D69E31948BCB989345D885BB03D61 5669~|~1~|~1~|~01/BRO~|~80/20 fed/local funding split for all bridge work. Old SFN: 4337107. New SFN: ?~|~10 - Bridge Replacement~|~E86AB5A18D90094DAE215BD81F6BF26EC8E830C7 108344~|~1~|~1~|~01/STR~|~Asphalt resurfacing on SR 9, SR 39, SR 43 and SR 332~|~05 - 4R Maintenance - Resurfacing~|~A5E88896BE8B9E2713D6D7FBA96AD60B203CADBA 108344~|~1~|~2~|~02/NFA~|~Asphalt resurfacing at Leesville Lake for the Muskingum Watershed Conservancy District (MWCD).~|~05 - 4R Maintenance - Resurfacing~|~F733957A60E476811A97E45F19CEB35BC909B820 108853~|~1~|~1~|~01/STR~|~Culvert replacement project. FY 2020. Rural other federal aid funded 80 federal/20 state.~|~04 - Reconstruction - No Added Capacity~|~EF82F4704D312A48B621C47F10B5FE2545543B22 107934~|~1~|~1~|~01/STR~|~All work in this split. Resurface on SR189 using district preservation funds (80% Fed and 20% State).~|~~|~409D916CF27B9C75333D0D59EC82E84B585661D7 107759~|~1~|~1~|~01/STR~|~Covers all work to rehab bridge~|~13 - Bridge Rehabilitation~|~8AEEDBA63D8AA7872FCE994DBBED345AFCEE5540 103665~|~1~|~1~|~01/STR~|~Landslide repair project. MEG CR 28 20.05. DSR MEG-001.~|~~|~3108E6751128B5A3152F30DE37C0176FF2572E49 121969~|~1~|~1~|~01/S5K~|~Congestion improvements utilizing Carbon Reduction Federal funds at 80% up to the CAP.~|~04 - Reconstruction - No Added Capacity~|~16234027E1F5E3D0742A49BF2AA9928D770DDDD2 119828~|~1~|~1~|~01/S>2~|~Pedestrian and crossing facilities on McNaughten Rd~|~28 - Facilities for Pedestrians & Bicycles~|~35923213C57F39151B8E48FDB3A502A30DB86737 119828~|~1~|~2~|~02/S>2~|~Pavement Maintenace on McNaughten Rd~|~17 - Construction Engineering~|~C966E430F3FE1586D205E01439880496655AA8F5 125383~|~1~|~1~|~01/STR~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~01ADB113F3CB7F733FBBA8247AD94F217EBCEFBD 125383~|~1~|~2~|~02/NFA~|~Resurfacing and related work.~|~05 - 4R Maintenance - Resurfacing~|~AD5ED11AE0B00F37F1A34FC620D5D94B304A47DA 116735~|~1~|~1~|~01/IMS~|~FRA-70-0.71 to 3.41 WB RESURFACINGFRA-70-0.00 to 4.78 WB & EB PAVEMENT REPAIR~|~05 - 4R Maintenance - Resurfacing~|~01BC4E9501E531F817EF3DBF89B9E28C8C472444 104873~|~1~|~1~|~01/MPO~|~13th Street pavement replacement from Broad Avenue to Harrison Avenue, in the City of Canton, Stark County, Ohio.~|~05 - 4R Maintenance - Resurfacing~|~0F172E5604236D0F42E0ECC04ECE0C3948387ECF 126337~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & Construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~2463BD8C57FC049C5ABF3A970D35A54FE87D2ADA 114042~|~1~|~1~|~01/CMQ~|~Conversion of the existing 4 lane divided section of US 52 in New Richmond to one lane of traffic in each direction on the northbound side of pavement and construct a shared use path on the southbound side of pavement. Conversion of four existing intersections to roundabouts.~|~28 - Facilities for Pedestrians & Bicycles~|~829B9F7889F688067F7A2DE51990AA2ADDDF6126 94685~|~1~|~1~|~01/STR~|~Landslide repair project using GSM funds. WAS 339 7.73-7.78. Rural other federal aid funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~42C5DE1052D3FB402E9E7C666497BB91D49651C4 108617~|~1~|~1~|~01/SAF~|~Signal upgrades.~|~21 - Safety~|~57A48D78663E46D521A85DD56BA14E4E1F16BE9A 105527~|~1~|~1~|~01/STR~|~Resurfacing. Work on SR 81 in Allen County from the SR 66 overlap to the Lima Urbanized Boundary at the bridge over McBride Creek at 10.71. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~2DB019A15ADA5E40F57646D6B0FC3A3F4D60CDA8 105527~|~1~|~2~|~02/S<2~|~Resurfacing. Work on SR 81 in Allen County from the Lima Urbanized boundary at the bridge over McBride Creek at 10.71 to Wapak Road at 11.34. All funds from the District Preservation Program budget. No local funds.~|~05 - 4R Maintenance - Resurfacing~|~0D985DF99000E1380F1AC25429F3F548308439FF 105527~|~1~|~3~|~03/NHS/LIMA~|~All resurfacing work in the City of Lima in Allen County. Work on SR 65 from 6.66 to Union Street at 6.80. Work on SR 117 from the intersection of Elm Street and Woodlawn Avenue at 15.34 to SR 65 at 16.87. The 80% federal funds in this plan split will be from the District Preservation Program budget. The 20% match will be provided by the City of Lima. The roadway sections in this split are no longer on the NHS. Urban STP funds will be used.~|~05 - 4R Maintenance - Resurfacing~|~4AA9AB9CAD4BA050EC0D2BF0E7315D145ACCC609 105527~|~1~|~4~|~04/NHS~|~All work that was in the Plan Split has been removed from this project.~|~~|~EEDE9FBFB5B20A6E30F073C41583C2FC7DC52869 105527~|~1~|~5~|~05/NFP/LIMA~|~Items paid 100% by the City of Lima. Auxiliary pavement markings, curb ramps and pavement repairs.~|~05 - 4R Maintenance - Resurfacing~|~22A9D5D750DD63F0504A08CCEA11EB16A9FD0CC5 114675~|~1~|~1~|~01/NFP~|~Created for ODOT TID funding~|~44 - Other~|~89FE074CA2E6A65F46A72335DCCCB66628D2EF0B 114675~|~1~|~2~|~02/NFA~|~Created for J&C involvement~|~~|~C696B70E132C5F2A1C9FB01B2496D4B1D3EC416B 115764~|~1~|~1~|~01/BRF/CCTD~|~Replacement of SFY 1332260, which carries Pond Run Road over Ten Mile Creek.~|~10 - Bridge Replacement~|~1B5D4924A43605660D1D78BEB2B306C15EDFDC58 125873~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~DDD62EF6EF26E304490C05458CF14BEFACD7D6FC 86723~|~1~|~1~|~01/STR~|~Resurfacing / Pavement Gnrl Sys~|~05 - 4R Maintenance - Resurfacing~|~19457D157395106C6E956EB14127B031E652DA2A 86723~|~1~|~2~|~02/STR~|~Bridge Repairs~|~13 - Bridge Rehabilitation~|~D32D4E0CFAFFC96D566B8DE50A11B8C0D3A8C893 123540~|~1~|~1~|~01/STR~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~931204D3BA74B321213C14A4F7286E6F42CCEDEB 123540~|~1~|~2~|~02/IMS~|~culvert linked~|~04 - Reconstruction - No Added Capacity~|~FAA13A8C548D3BA78B6D9B4EB10542851B7DB341 114821~|~1~|~2~|~02/S>2~|~Columbus Urban Area Plan Split~|~05 - 4R Maintenance - Resurfacing~|~8B3EBA18C1B88DA0860E741C6FC970E803288B54 114821~|~1~|~1~|~01/STR~|~Rural Plan Split~|~05 - 4R Maintenance - Resurfacing~|~E19BDCDA6B15955847C3D6E06DFE0B73F4D665FE 122943~|~1~|~1~|~01/STR~|~Chip Seal Surface Course at NOB-CR-16-0.00 for 3.41 miles. ~|~05 - 4R Maintenance - Resurfacing~|~A0EA5347E6A8ECBAA724E78DDC3D585E30EDAAD1 110378~|~1~|~1~|~01/S>2~|~Improve intersection of SR 3 (Westerville Rd) at Morse Rd~|~21 - Safety~|~29E9F379A395DA564F6819E4FBBDEBA488F51646 110378~|~2~|~2~|~02/SAE~|~Utility Work during Construction~|~21 - Safety~|~8E81971C1C21FAEAF6AFDDAAB473E8D5E8312AAD 113061~|~1~|~1~|~01/NHS~|~All work is in this split.~|~05 - 4R Maintenance - Resurfacing~|~D2194E2B7F5311DFB322D598E2E2507C82F212F3 122893~|~1~|~1~|~01/NFP~|~All work included in this plan split.~|~44 - Other~|~6981FE486636F065E85D4C6EABE5957602952AFC 96968~|~1~|~1~|~01/IMS~|~Spot paving on various routes in ATB, MAH and TRU Counties~|~05 - 4R Maintenance - Resurfacing~|~902223BA202A386D8A6F416B64B28F520F5EF830 87305~|~1~|~1~|~01/STR~|~generaly system resurfacing of HOL-39-24.24 to 32.19; included repair of mianline pavement and shoulder areas used for Amish buggies and pavement marking~|~05 - 4R Maintenance - Resurfacing~|~31188966576884DDA956855E7B6F03AB010C24BC 109710~|~1~|~1~|~01/NHS~|~Concrete pavement repairs on:~|~05 - 4R Maintenance - Resurfacing~|~9A84AE95CFF917ACCCFE485171D14DB021322F43 113783~|~1~|~1~|~01/MPO~|~Construction of a shared use path on the north side of Smith Road from west of Beckett Park Drive to west of Beckett Road.~|~28 - Facilities for Pedestrians & Bicycles~|~2422F8FF92CF8F079AC04FCB893C0F69454F3E5F 115680~|~1~|~1~|~01/BRF~|~Superstructure replacement of SFN 5134390~|~13 - Bridge Rehabilitation~|~4A15B92A0FE86D353CE447EFC2673399538A8D0D 94432~|~1~|~1~|~01/STR~|~Bridge Rehabilitation~|~13 - Bridge Rehabilitation~|~5325597AD8F9726339C132D450DD5C06ECF9D87E 123861~|~1~|~1~|~01/SAE~|~Preemption at the intersection of Harris Avenue and Forrest Avenue in the city of Norwood~|~22 - Rail/Highway crossing~|~A077D617D7CC18FD50B9722B320088B7872FC70A 126002~|~1~|~1~|~01/NHS~|~establish funding ~|~05 - 4R Maintenance - Resurfacing~|~4FD9AC9BB8E17779C1E7E465F8711115FB5E5A56 88772~|~1~|~1~|~01/STR~|~Deck overlay with micro silica on SFN 5504775 MIA SR 721 0393.~|~10 - Bridge Replacement~|~399237F841155ED318AFF6666979B65163EFCB25 102036~|~1~|~1~|~01/ENH~|~COC DOP Utility Pole relocation~|~43 - Utilities~|~659D0E2AF4180426E14EB4F2BBB890D58F93253E 77440~|~1~|~1~|~01/NHS~|~Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FA42FB40E2CB001BAE1DCFC2B585EF14EE693AE0 115817~|~1~|~1~|~01/SAF~|~Guardrail~|~21 - Safety~|~C9807CF162FB9C1054AADC3B9C9AF4E4096E51E6 121396~|~1~|~1~|~01/S5K/Shby~|~Reconstruction of Mickey Road~|~04 - Reconstruction - No Added Capacity~|~5FBF40E168F9B84619D2EAFB3FC3761F95E8AE2C 121480~|~1~|~1~|~01/S5K~|~Asphalt Concrete Overlay Fed/City Split ~|~05 - 4R Maintenance - Resurfacing~|~908D9E24AD1330C7363084B846336140EFC76B30 121480~|~1~|~2~|~02/S5K~|~Asphalt Concrete Overlay with Repairs 100% City Split (Items Such as Pavement Repairs, Reclamite, etc.):~|~05 - 4R Maintenance - Resurfacing~|~DD90182D362DF2B9C1C4346015A65B82566B9048 126124~|~1~|~1~|~01/NFP~|~Created for J&C Involvement~|~44 - Other~|~8E11C4DA4C02E40D38B9801432014210D1713992 106510~|~1~|~1~|~01/NFA~|~The project will line the existing structure with a Con Tech Bridgecor Arch Structure~|~01 - New Construction~|~CC1CA344FE1A7634F1E601C248324CBAFC3ED93B 116358~|~1~|~1~|~01/NFP~|~Created for J&C Involvement. ~|~44 - Other~|~C59F150A5829A0306ED81DB6AC90E5829856F6B3 118175~|~1~|~1~|~01/NHS~|~Safety Items~|~21 - Safety~|~0DFD63EDDB2A4D2F093F91EF42E2BBC50FA99A62 102754~|~1~|~2~|~02/STR~|~General maintenance on NHS bridges.~|~47 - Bridge Preventive Maintenance~|~65A4BCE50285706D4DF27F31B87B76AB65B28B6A 102754~|~1~|~3~|~03/S>2~|~Drainage system repair.~|~47 - Bridge Preventive Maintenance~|~377B3921689ADBD754AFBD362A024F9C769C3635 102754~|~1~|~4~|~04/IMS~|~Plan split for HAM-71-0320 McMillian Street over I-71 Barrier Collision damage repair. All costs associated with the location shall be billed to this plan split for insurance reimbursement purposes.~|~13 - Bridge Rehabilitation~|~D35A9729E44D17E078DE84752CDFD5D139C64180 102754~|~1~|~1~|~01/IMS~|~General maintenance on the BUT-75 bridges including associated approach work. This plan includes the cost for the base option barrier and fence on these bridges, and the alternate bid for the aesthetic upgrades to the barrier and fences. HAM-71-0320 is in a separate plan split.~|~13 - Bridge Rehabilitation~|~6362326A9721B5C78BBE752A2E558396D2EF7CFB 119734~|~1~|~1~|~01/BRF/HAM~|~Demolition of the South G Street bridge (SFN 0960306) in the City of Hamilton.~|~10 - Bridge Replacement~|~2FB2BB27C9338037A3D78B932031993715CBE42A 102828~|~1~|~1~|~01/STR~|~Plan Split 01 created for STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~3FACBCA468B79A9B30612FFF9CCD339D180AC3C5 81467~|~1~|~1~|~01/NHS~|~Rehabilitate Bridge HAM-562-0065 (SFN 3113841) over SR 4. Work includes deck replacement, paint, and minor widening to accomodate MOT.~|~13 - Bridge Rehabilitation~|~7E39017E781641307F725393C63AB70437A1BDFE 96482~|~1~|~1~|~01/IMS~|~Deck replacement and widening of SFN 4807081 ( L ) & 4807081 ( R ) over Monclova Road and NS RR~|~~|~D349D0C4E75C367770FE241198B3581664EABE86 95566~|~1~|~1~|~01/MPO~|~Demolition of on structure associated with Seiberling Way project. In the City of Akron, Summit County, Ohio.~|~44 - Other~|~E6385FBE47E6263D264C723EA2AC4372530A3BAA 91893~|~1~|~4~|~04/IMS~|~"04/IMS/BR/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP -Deck Sealing on Gue-IR 77: 1) SFN 3002675; 2) SFN 3002764; 3) SFN 3002829; 4) SFN 3002942; 5) SFN 3002977; 6) SFN 3003000; 7) SFN 3003035; 8) SFN 3000273; 9) SFN 3003094;~|~47 - Bridge Preventive Maintenance~|~E7045DC43CDFA4BB9F4F78F057858D14FCB8AB91 91893~|~1~|~3~|~03/IMS~|~"03/IMS/OT/ " - District Preservation 4PF7 (90% Federal) / 4PS7 (10% State) - No CAP for lighting at Gue-77/209 Interchange~|~44 - Other~|~2FE7C100051792DC29BFE7FF020E854AC514BFFB 91893~|~1~|~5~|~05/IMS~|~"05/IMS/PV/ " - Facilities Rest Area Funding 4BR7(100% State) - No CAP -Resurfacing with repairs of Gue-IR 77 NB Rest Area Park 29.~|~05 - 4R Maintenance - Resurfacing~|~A8EB9BE29D2852354B8D9361834E7874840E893A 91893~|~1~|~2~|~02/NHS~|~"02/NHS/PV/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Resurfacing on Gue-SR 209-14.57 to 15.07;~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9E3BC9CB41CD33987D2CFC4053FBE380FB8FE0C3 91893~|~1~|~1~|~01/IMS~|~"01/IMS/PV/ " - District Preservation 4PF7(90% Federal) / 4PS7(10% State) - No CAP -Resurfacing on Gue-IR 77-02.50 to 11.70~|~05 - 4R Maintenance - Resurfacing~|~B9E55DC7B763367BADB6D82C512471241509DB6C 107481~|~1~|~1~|~01/STR~|~AC Overlay without repairs~|~05 - 4R Maintenance - Resurfacing~|~F2623A2C0958FB61C3FBD09C4B269A5C7E8BA1A2 123071~|~1~|~1~|~01/SAF~|~Install a SUP along the north side of Eakin Road from Wayne Ave to Whitethorne Ave and the south side of Eakin Road from Whitethorne Ave to Harrisburg Pike (US 62).~|~28 - Facilities for Pedestrians & Bicycles~|~6277A13D838581F10C6B9BFAB68D8B983AF3C1A2 98102~|~1~|~1~|~01/NFP/PCEO~|~Replacement of the existing steel truss bridge carrying TR 445 (Sonora Road) over Twin Creek (SFN: 6837255).~|~13 - Bridge Rehabilitation~|~F6C6AE0AC8C80E2E047E1F23DB26C537EF9034D1 101080~|~1~|~2~|~02/S<2~|~Overlay various routes in Miami County with fine graded aggregate: MIA SR 55 SLM 13.01 to 13.70 = = MIA SR 202 SLM 11.24 to 11.62 = = MIA SR 571 SLM 20.84 to 22.08.~|~05 - 4R Maintenance - Resurfacing~|~63F8AAE71929001600CD191896051A63755C5183 101080~|~1~|~1~|~01/STR~|~Bridge preventive maintenance.~|~47 - Bridge Preventive Maintenance~|~6B115B2BEC429C234FE1189BD67D1865261747EA 113921~|~1~|~1~|~01/BRF~|~CEAO Funded items~|~13 - Bridge Rehabilitation~|~6D135F61F788AEA85700D03F869DBC33AA001FFC 95758~|~1~|~1~|~01/STR~|~OTT-269 from SLM 1.50 to 3.94~|~05 - 4R Maintenance - Resurfacing~|~843CF91318CA5C88815A8A2A9E4A7FF0FD909C77 118505~|~1~|~1~|~01/MPO~|~Federally eligible items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~94473971AC0EB19A3A5031F0B5F55DAD14ABF578 118505~|~1~|~2~|~02/MPO~|~Ineligible utility work.~|~~|~9600EDDA6192BD04959B22E2DC6D40A5BC89E330 95296~|~1~|~1~|~01/IMS~|~SFN 4803183 Oakwood Ave bridge over I-75.~|~13 - Bridge Rehabilitation~|~94CF210AE37733099D4BDF2317F51BF2B1C5A5AA 91147~|~1~|~1~|~01/IMS~|~FRA-71: 25.62-28.72 pavement resurfacing~|~05 - 4R Maintenance - Resurfacing~|~33EBE708605F3A9CE914D90EE4139CB30AE77797 107817~|~1~|~1~|~01/S<2~|~Emergency landslide repair.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~61BD0006CCC59E3C295EFADAD0418643D0AC31ED 114419~|~1~|~1~|~01/STR~|~Resurfacing SR 212~|~05 - 4R Maintenance - Resurfacing~|~5B083BA4121D8CC72E06686F49F7AD3C83C7392A 92131~|~1~|~1~|~01/STR~|~resurface OTT SR 105 0.00-11.09 - Sandusky County line to SR-19~|~05 - 4R Maintenance - Resurfacing~|~16041C2CE02947137FC693F4E2CCB14751C9431E 92131~|~1~|~2~|~02/STR~|~One culvert at 3.15~|~04 - Reconstruction - No Added Capacity~|~35F7D7D10F814A88704FA006A9A5E6D13DF5DE2C 94404~|~1~|~3~|~03/NHS~|~SLM 0.00 - 0.27~|~05 - 4R Maintenance - Resurfacing~|~9978D158535C0DBDFFA2D4AC204DF65F8914C8C6 94404~|~1~|~1~|~01/STR~|~Resurfacing SLM 1.05 - 1.61~|~05 - 4R Maintenance - Resurfacing~|~CBF4FEAE71E4DDC8EFD0B116C11B4DEEA2C1E6F8 94404~|~1~|~2~|~02/S<2~|~SLM 0.27 - 1.05 (Galion) SLM 1.61 - 3.91 (Mansfield(Richland))~|~05 - 4R Maintenance - Resurfacing~|~EFB3E11ABE333B65756CA447259DBB8E88CC5F8A 120383~|~1~|~2~|~02/S5K~|~Urban Paving plan split~|~05 - 4R Maintenance - Resurfacing~|~283F4394479DD1BCB69CF102C646367CB3C8B3B6 120383~|~1~|~1~|~01/S5K~|~Small City funds for Oak Harbor Rd (CR 19) and Moore St (MR 557)~|~05 - 4R Maintenance - Resurfacing~|~EB35B127256D979502ED568885308DF4D416970B 120383~|~1~|~3~|~03/NFP~|~Plan Split for 100% locally funded scope items, including non-eligible Urban Paving items and water line improvements.~|~44 - Other~|~2E17B176A252BA8046B3397963DD4B96B94F1348 126331~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~307FD67EEB13F4E114A7E2B62C39AB4EDA079337 86928~|~1~|~1~|~01/SAE~|~Signal at SR532~|~21 - Safety~|~480FFE4714EE095D5A9DD34560B809D1B9F11761 120795~|~1~|~1~|~01/BRO/SUCE~|~Bridge replacement.~|~10 - Bridge Replacement~|~760C6A76BB84AC1BBCFC8BAB73CAF0CF9C79FCB4 120795~|~1~|~2~|~02/BRO~|~Twinsburg bridge replacement items.~|~10 - Bridge Replacement~|~9120C76959DEE8341E533301930534240005938E 112956~|~1~|~1~|~01/STR~|~Overlay on ROS 41 & 50~|~05 - 4R Maintenance - Resurfacing~|~3130C4CBDE091ADF67DCA4BBD68876720422A9D3 112956~|~1~|~2~|~02/STR~|~Bridge PM.~|~47 - Bridge Preventive Maintenance~|~0B07373491833272066F31F600C088D42CAB95E0 126160~|~1~|~1~|~01/NHS~|~Plan split for culvert work~|~04 - Reconstruction - No Added Capacity~|~1A601E2A87FA7721CC7EC272771F2D04242F2C5C 127053~|~1~|~1~|~01/NHS~|~plan split.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~1A328EB2961A211EC50C2504143303512B08A894 126698~|~1~|~1~|~01/STR~|~STP Rural bridge plan split.~|~10 - Bridge Replacement~|~464119B3EDF1242E6D104DF2B9B5B53D8B77A231 123565~|~1~|~1~|~01/SAE~|~Replacing R-WR striping~|~21 - Safety~|~FE6BFD8AA525A35F59B8F168E5BC74C10B8E464A 117251~|~1~|~1~|~01/SAF~|~remove and replace all type A guardrails~|~21 - Safety~|~BDEA580CB5CA765E3EFAA438FD54CA718D44DA42 84596~|~1~|~3~|~03/S>2~|~Resurfacing SR5 4.93-8.15 and 14.89-15.71~|~05 - 4R Maintenance - Resurfacing~|~1959302E693949803C1A86C9045DED7A2E61E98A 84596~|~1~|~1~|~01/STR~|~SFN 6700241 11.40 SR5 over mahoning river. SFN 6700276 12.34 SR5 over mahoning river.~|~13 - Bridge Rehabilitation~|~529A7D4B8AB8CF3C10ABBE7EF7AD4F9100461D2D 84596~|~1~|~2~|~02/S>2~|~SFN 6700306 14.97 under camp ravenna RR S. SFN 6700217 6.24 SR5 over hinkley creek. SFN 6700187 5.58 over W BR mahoning river. SFN 6700160 4.62 SR5 over mahoning river.~|~13 - Bridge Rehabilitation~|~610EAA6B731FD21F7C597DF4EA0F8C3A66C4985A 84596~|~1~|~4~|~04/STR~|~Resurfacing SR5 8.15-14.89~|~05 - 4R Maintenance - Resurfacing~|~95666CD4C27B26D23E193EB8F915E1E410B81688 95589~|~1~|~1~|~01/CMQ~|~Bike/Hike path. CMAQ funds from the Lima-Allen County Regional Planning Commission. The CMAQ eligiblity was approved in an April 14, 2014 letter.~|~28 - Facilities for Pedestrians & Bicycles~|~A6349E9435EAB68597817F860CD9C695FD5170C9 124814~|~1~|~1~|~01/SAF/JEF~|~Guardrail upgrades utilizing CEAO HSIP (4HB7) funding at 100%.~|~21 - Safety~|~8FAD7A9A2C4F3A105BAD01BFF56E82BC70C0F6A4 107267~|~1~|~1~|~01/S>2~|~Slide repair work eligible for federal/state funding~|~44 - Other~|~8BD50002117A379FBA79E95AA17C1E4BAA56DA73 114469~|~1~|~1~|~01/NFA~|~Resurfacing HAS-258 and TUS-258 from SLM 16.55 to SLM 20.90~|~05 - 4R Maintenance - Resurfacing~|~33D458FF5E88B4AE7A8CFFCDF639053F8BCEEABA 114469~|~1~|~2~|~02/STR~|~Resurfacing TUS-258 from SLM 20.90 to SLM 21.23~|~05 - 4R Maintenance - Resurfacing~|~FD338F0657D6C5C95005DC5D83938C93713D5015 96472~|~1~|~1~|~01/NFP~|~District 12 task order contract for General Engineering Services (GES) for SFYs 2014-2015 used for construction inspection services.~|~17 - Construction Engineering~|~83AEEBEA7AF90F72815EBF8264BF0B63672358FE 109517~|~1~|~3~|~03/MPO~|~Split for MPO funded work on Liberty Road~|~05 - 4R Maintenance - Resurfacing~|~33F3F47728AE0743B950241E1C0E04ED7C15C2AD 109517~|~1~|~1~|~01/SAF~|~Reconstruction and widening work on SR-43 eligible for safety funds.~|~03 - Reconstruction - Added Capacity~|~9F2339FE3C8F0D9C619E13F8924B85A8B5651383 109517~|~1~|~2~|~02/NHS~|~Split for urban paving funding on SR-43~|~05 - 4R Maintenance - Resurfacing~|~668960894DCE29860BF312B44A143E31CA640260 109517~|~1~|~4~|~04/NFP~|~Work in the project that is 100% local cost such as waterwork and paving/repairs on local streets. ~|~03 - Reconstruction - Added Capacity~|~62B5A1EBCF4ADA2890637494BDCC8106A2D1BD97 85216~|~1~|~1~|~01/STR~|~80/20 fed/state funding split for all pavement work using federal STP funds.~|~05 - 4R Maintenance - Resurfacing~|~4FDBC8254F0C89C2E968E8249941DD044C63395C 86555~|~1~|~1~|~01/MPO~|~MORPC STP funding to widen Alum Creek Drive from 2nd St to SR 317. Intersection improvements at SR 317.Local Sponsor - Columbus Airport Authority~|~03 - Reconstruction - Added Capacity~|~F7FBD072CD34CD387A33BE775C2DBFDAE19F0FDB 98724~|~1~|~1~|~01/NFA~|~The city is constructing road improvements to widen and upgrade East Maple street from North Main Street to to Taft Ave.~|~03 - Reconstruction - Added Capacity~|~D2B17CB70F7A6B75A67332862F36B7439C66E905 114441~|~1~|~1~|~01/IMS~|~Resurfacing IR 77~|~05 - 4R Maintenance - Resurfacing~|~9A36AC48274FCF5C5FF7C55D69574ABB72ED6CB4 84402~|~1~|~1~|~01/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~B15442699B18D484A94974734A29BD06A530E8CC 116094~|~1~|~1~|~01/NFP~|~Pavement preventive maintenance on various routes in POR, STA and SUM counties.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~05441C72DB93DE29C55E1397B11DD977C2073EAB 84405~|~1~|~2~|~02/S>2~|~80/20 funding split for work that is eligible for State STP funds~|~05 - 4R Maintenance - Resurfacing~|~438F422C66C60941993FF7972B80AFF5D326388D 84405~|~1~|~1~|~01/NHS~|~80/20 funding split for work on the NHS portion that is eligible for federal funds~|~05 - 4R Maintenance - Resurfacing~|~DC406E4183D76F1155206C0BAA8B7A0B992C4F03 84405~|~1~|~3~|~03/NFP~|~Split for items of work not eligible for federal funding paid at 100% local.~|~05 - 4R Maintenance - Resurfacing~|~2D8403192085A134EC259ADA4164103FF99BC4F7 103083~|~1~|~1~|~01/STR~|~Landslide repair project. NOB 145 10.03. DSR NOB-004.~|~~|~7C4DC7F396F033AB4E4D747A067548359CE10AE7 100166~|~1~|~1~|~01/NHS~|~Bridge Rehab.~|~13 - Bridge Rehabilitation~|~9C6BB2E8753291825CB81C3BC1F25B509E9918C6 119195~|~1~|~1~|~01/NFP~|~Culvert replacements and repairs.~|~04 - Reconstruction - No Added Capacity~|~10324603E538959ADFBBA1D4427D9045B7EBB3C6 115410~|~1~|~1~|~01/S>2/Cols~|~Reconstruct signals on Rich St between Third St and Grant Ave~|~21 - Safety~|~A1853183D07B2C6F4EF4D0707C8FE0BF83D7A37F 93286~|~1~|~2~|~02/S<2~|~General system paving in the urban func class areaDEL-37: 6.92-7.39~|~05 - 4R Maintenance - Resurfacing~|~501537F32BD904B213B3D3638DC95B692A6D58AC 93286~|~1~|~1~|~01/STR~|~General system paving in the rural func class areaUNI-37: 10.01-13.95DEL-37: 0-6.92~|~05 - 4R Maintenance - Resurfacing~|~B127F65F530B57A8B8700FD96FD3C5EA45AA76CD 121493~|~1~|~1~|~01/NHS~|~Superstructure replacement.~|~~|~A47516C1808BEFA9393613604E1E522BCBC7E425 90260~|~1~|~1~|~01/NFA~|~Multi-phase project that supports the region's logistics and distribution strategy for providing multi-modal options for regional companies with new full freight rail service from the CSXT mainline to East property line of the Dayton International Airport.~|~~|~3C40EC2B289CAAF0E31352784CE28E7D2EADD43C 90260~|~1~|~2~|~02/NFA~|~Multi-phase project that supports the region's logistics and distribution strategy for providing multi-modal options for regional companies with new full freight rail service from the CSXT mainline to East property line of the Dayton International Airport.~|~~|~C9BC4E3F82C51CD56A8FB59EE362490EFB50A40C 112588~|~1~|~1~|~01/NHS~|~Funding Plan Split for programming project, update prior to plan file with an accurate description of the work.~|~47 - Bridge Preventive Maintenance~|~0818CDAE70B38AF9600018F72E4A795FF36900F8 121174~|~1~|~1~|~01/NFP~|~crack sealing plan split.~|~99 - State Preventative Maintenance~|~E24AF26D64D8FC11F26CBEC5257956D6EAACA8A2 117804~|~1~|~1~|~01/NFP~|~Plan Split 01/NFA/OT/NALB~|~01 - New Construction~|~D8D35036C89A1A56928BA80579D42A870EF75429 126289~|~1~|~1~|~01/NFA~|~Created plan split for detailed design & construction - NEVI Round 3.~|~63 - Electric Vehicles & Charging Infrastructure~|~7F5A0D047082C0E3DC838D4CCDCA0C79E39F2E49 98146~|~1~|~1~|~01/CMQ~|~Widening of Dayton-Xenia Road (CR-142) from East Lynn Drive to Woods Drive to provide a center two way left turn lane, addition of sidewalks along both sides of the roadway, installation of curb and gutter and storm sewer improvements. On-street parking will be investigated to mitigate parking losses resulting from the widening.~|~21 - Safety~|~1642168636C7ED288DA9B6ECD071C9AF53D560B4 94140~|~1~|~2~|~02/S<2~|~Resurfacing of MAH SR 45 from 0.00 to 0.99.~|~05 - 4R Maintenance - Resurfacing~|~84204AF159C0FF68D51E5ECDE3765B5F75084511 94140~|~1~|~3~|~03/IMS~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~67DA6E95AB083CBFB81F249B2535D5A680FA42A8 94140~|~1~|~5~|~05/STR~|~Minor bridge work 10' to 20' span.~|~04 - Reconstruction - No Added Capacity~|~E5149BB12A309FE87F70965185AE369CC2683F8B 94140~|~1~|~4~|~04/STR~|~Minor bridge work > 20' span.~|~13 - Bridge Rehabilitation~|~B5FDDAD6A35B88C4607B21A84D57CB39E8DB2CB3 94140~|~1~|~6~|~06/SAE~|~Cable Barrier guardrail on MAH IR76 (SLM 1.30 to SLM 8.64) and MAH IR80 (SLM 0.00 to SLM 1.20).~|~21 - Safety~|~CABDDAE7F9803CFEF9F8B6B74792BB00DE74A482 94140~|~1~|~1~|~01/STR~|~Resurfacing of MAH SR 45 from 0.99 to 11.77.~|~05 - 4R Maintenance - Resurfacing~|~89CAE8A6ECC9736A520334678C850656FD42727C 94140~|~7~|~7~|~07/IMS~|~Concrete pavement repairs on I80 from the Ohio Turnpike to I680 split.~|~05 - 4R Maintenance - Resurfacing~|~FCC4F8618F05FD13C381F4259E9A99E170F06741 98777~|~1~|~1~|~01/BRO~|~Change Order for Block PID~|~44 - Other~|~7CB3C8373DC223759F0D6B4C4B75FD1832A2A9AC 105879~|~1~|~1~|~01/S>2~|~Resurfacing including the installation of curb, gutter, sidewalk, storm infrastructure, and lighting. ~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~0FD975A96648ECF51B4D7BE3F2C1F8CA2B8E86C0 116951~|~1~|~1~|~01/STR~|~WOO-18 from SLM 6.67 to 9.517~|~04 - Reconstruction - No Added Capacity~|~7424A76C30B82FF7971EC9444BDC017266E3FF29 116951~|~1~|~2~|~02/NHS~|~WOO-18 from SLM 9.517 to 10.53~|~04 - Reconstruction - No Added Capacity~|~A8F81126C269613B5EA6BA4B9033FCD4E232C89D 96360~|~1~|~1~|~01/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Bridge rehabilitation on 1) 3004937 Intersect: Over Leatherwood Creek Trib; Not BR Eligible for Rehabilitation: Length=31 SD/FO(0) SR=97.3 DSR=8;~|~13 - Bridge Rehabilitation~|~4338CA323925224BE650A5F8B5BD1ED560BC1214 96360~|~2~|~2~|~02/STR~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7(20% State) - No CAP - Bridge rehabilitation on 1) 3004953 Intersect: Over Websters Run; Not BR Eligible for Rehabilitation: Length=54 SD/FO(0) SR=78.4 DSR=5;~|~13 - Bridge Rehabilitation~|~E948A48DB297B206563AB9BC9EFFF340D13E7E86 91774~|~1~|~1~|~01/IMS~|~Four-lane concrete pavement repair project. NOB 77 6.40-11.18. Interstate route funded 90 federal/10 state.~|~05 - 4R Maintenance - Resurfacing~|~9A20C95EEED3ABB8F75C0FE195541E787688D7D1 91774~|~1~|~2~|~02/STR~|~Two-lane concrete pavement repair project. NOB 78 7.07-7.17. Funded 80 Federal/20 State. ~|~05 - 4R Maintenance - Resurfacing~|~177C478F2410A172464C55A400E720A7CF1F1855 105935~|~1~|~1~|~01/MPO~|~streetscape/multipurpose path construction eligible for federal-aid~|~28 - Facilities for Pedestrians & Bicycles~|~3990D04FFAC67DA6BF43D7E3DA9A21B340B7C2CD 105935~|~1~|~2~|~02/NFP~|~1005 Local items~|~28 - Facilities for Pedestrians & Bicycles~|~C88B4787B11A1AA9C0153FFB49B50D59ABC254DB 109790~|~1~|~2~|~02/SAF~|~Wet reflective pavement markings.~|~21 - Safety~|~D16F42449D323DED38CABD9AFC65E554A3E790F5 109790~|~1~|~1~|~01/IMS~|~Double micro~|~05 - 4R Maintenance - Resurfacing~|~61DA2496DED17D4E0918E2BC0071F3454E0C7139 122862~|~1~|~1~|~01/NFA~|~Crack seal and seal coating at Buckeye Pavilion parking lot.~|~05 - 4R Maintenance - Resurfacing~|~3C7B3339A6AF7F87D6B5328A3B2F04EF2975BA27 100988~|~1~|~1~|~01/STR~|~DSR# BEL-010~|~04 - Reconstruction - No Added Capacity~|~312EE534DA7844D4B9715D3650BA18807B8D97BB 114425~|~1~|~1~|~01/BRO~|~Rehabilitate bridge carrying SR 148 over Long Run by replacing the superstructure.~|~13 - Bridge Rehabilitation~|~8EF2C8AA8B0474F6F16EECB5BF757251290086C4 99550~|~1~|~1~|~01/CMQ~|~Purchase Gantry Crane for Port of Cleveland~|~~|~E5FE9C527F8A620F4DD47933AF0FD90562EE20D0 93728~|~1~|~1~|~01/ERD~|~Construction of trailhead and amenities along the TRU-Greenway trail.~|~28 - Facilities for Pedestrians & Bicycles~|~4741E7324081D262D20D695A278E15E369350430 121440~|~1~|~1~|~01/NHS~|~Plan split for resurfacing work on WIL-6~|~05 - 4R Maintenance - Resurfacing~|~6DA76BDDBB19AB6D4F6E76890EB4A7BDBB072B91 112741~|~1~|~1~|~01/MPO~|~Resurfacing of Hopocan Ave from Hillsdale Ave to 8th St NW in the City of Barberton.~|~~|~027BE5703E0E86529EB09A15E68B88FE3657195A 19001~|~1~|~1~|~01/STR~|~"01/STR/PV/COL" - Realign ~3,400? of CR403 from 0.3 mi N of TR802 to 0.3 mi N of TR801. Improve geometrics & intersection at TR801. Guardrail, signing, striping, 9? culvert.~|~~|~C096DB4D3D3773054DE41CA2868FBE88EB5FD84D 123927~|~1~|~1~|~01/SAF~|~Plan Split for Abbreviated Safety funding.~|~~|~087CE510C6EFFA39B599988735A3E39A9E922712 104857~|~1~|~1~|~01/MPO~|~Construction of Bike lane along SR 172 in the City of Massillon.~|~28 - Facilities for Pedestrians & Bicycles~|~CD1769129A87ECBF0726A03956F11745B5D3B0C5 104857~|~1~|~2~|~02/NHS~|~100% waterline work paid by Aqua Utility.~|~~|~D4174A7E0A7AF4C52BCC72932DEFDDA738258F96 96648~|~1~|~1~|~01/S<2~|~Two-lane resurfacing project using a microsurfacing treatment. GAL 588 6.95-7.74, 9.89-10.83. Urban other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~A4EE218FD9182D2F5C8C02788BEB40636EC7777A 96648~|~1~|~2~|~02/STR~|~Two-lane resurfacing project using a microsurfacing treatment. GAL 588 0.76-6.95, 7.74-9.89. Rural other federal aid funded 80 federal/20 state.~|~05 - 4R Maintenance - Resurfacing~|~E598ED1852AB1271F5821BD00A8D0484F4AC3EA7 109573~|~1~|~1~|~01/STR~|~Culvert Replacement~|~~|~A53FE50D27349E9DFB9CA100AF6E13B48E375D34 121238~|~1~|~1~|~01/STR~|~conduits linked~|~17 - Construction Engineering~|~6906F8369E2701A3A74B014DCA69B2EDF0CBC80A 121238~|~1~|~2~|~02/STR~|~conduits linked~|~04 - Reconstruction - No Added Capacity~|~D6DEB61765D63041EC6D1522E871A01CE2D2728E 125903~|~1~|~1~|~01/IMS~|~Establish pro rata percent~|~44 - Other~|~9479DC69D4F6C630FB64F3AFC207F6F5AE547FB4 121972~|~1~|~1~|~01/IMS~|~Plan split for bridge rehabilitation to an on system bridge~|~13 - Bridge Rehabilitation~|~EEFFF5C4F5041E3498B2FFE484DC401760FF2F90 101578~|~1~|~1~|~01/S>2~|~Repair and resurfacing of Reading Road (US-42) from Inwood Drive to the northern Village corp. line (north of McSwain Drive). Also included is driveway reconstruction, drainage improvements, replacement of existing deteriorated concrete sidewalk, replacement of curb, and application of new pavement markings.~|~04 - Reconstruction - No Added Capacity~|~9D5A39BB563878AA06569BBE711DCD13B612F5F8 95814~|~1~|~2~|~02/NFP~|~on SR-184 from SLM 7.48 to SLM 10.14 non eligible urban paving items.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~067B8254F11F02733F55ADEA78859127E98787AA 95814~|~1~|~1~|~01/NHS~|~on SR-184 from SLM 7.48 to SLM 10.14 urban pav from face to face of curb and 3" deep.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~9793828437950C6BCD18626A4B07BFDC49479843 119884~|~1~|~1~|~01/NFA~|~NEVI Round 2 33-C~|~63 - Electric Vehicles & Charging Infrastructure~|~F40BABE3518C61AEAC39E0FF64B76B0CB21F47C6 110245~|~1~|~1~|~01/BRO~|~District Preservation Bridge Funding - 4PF7 (80% Federal) / 4PS7 (20% State) - No CAP) - Replacement of the deficient bridge (SFN 3004058) which is BR Eligible: L=848'; SD/FO (1); DSR 4; SR 58.2~|~10 - Bridge Replacement~|~C6C59C6962345CD07C2388FDF8084A1681E8AD29 110245~|~1~|~2~|~02/ENH/CAMB~|~Local Funding - 4BG7 (100% Local) - No CAP - Repair of steps near GUE-209-8.56 bridge.~|~28 - Facilities for Pedestrians & Bicycles~|~B42B4F652ABD2430B334EFF46A864763D8426227 105559~|~1~|~1~|~01/STR~|~Culvert MED-SR-57 3.407 CFN 1886755 Install a spincast concrete liner.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~7044A911287DA798EE86EE4A889FEABBDAE44044 105559~|~1~|~2~|~02/IMS~|~Split 2 for the two culverts on WAY IR 0071:WAY-IR-71 3.975 CFN 1811507  Install a spincast concrete liner or a cured in place liner.WAY-IR-71 5.492 CFN 1825281 Install a spincast concrete liner or a cured in place liner.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~E0AAC929E0D096BC71127AFB9A964BA7790E295D 82977~|~1~|~1~|~01/IMS~|~Plan Split for the work on IR 71 in Clinton County from SLM 7.27 to 10.57~|~99 - State Preventative Maintenance~|~5D44058B4EB65F2F2F27DF3AA6F10CB5349B3CFB 82977~|~1~|~2~|~02/NHS~|~Plan Split for all work on CLE-32. This routes is a NHS route.~|~99 - State Preventative Maintenance~|~35749962C5D32F4D69EE6E462FC7D2ECE29D416E 123998~|~1~|~1~|~01/BRO~|~Replace bridge carrying US 62 over Branch of Wolf Creek.~|~04 - Reconstruction - No Added Capacity~|~C5039E3EE2C688137F06F04EFE8F15BB1EA4028E 101143~|~1~|~1~|~01/STR~|~Various bridges~|~17 - Construction Engineering~|~70423954B3B5E8441946DD8272586B368F3B30EA 111584~|~1~|~1~|~01/NHS~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~D90ED6C4FE55E8D9CAB3F257EAEE1A71F9638C03 111584~|~1~|~2~|~02/NHS~|~100% local items~|~17 - Construction Engineering~|~8E2E34204D5FF8B924AC37D15770498259D4893F 93940~|~1~|~1~|~01/NFP~|~District wide long line pavement marking plan for FY 15.~|~21 - Safety~|~714842D50E98E7920B6E8C21D8FA1AF1CA3DB73A 100804~|~1~|~1~|~01/IMS~|~Bridge sealing on mainline bridges on IR 71 in Hamilton County~|~47 - Bridge Preventive Maintenance~|~C0CF0976523F01F8083D56BB7852CC2C8F82E143 75661~|~1~|~1~|~01/BRF~|~Bridge replacement project for MEG 143 1400. SFN 5302498. 80/20% Federal/State.~|~10 - Bridge Replacement~|~4E7DA5DF3A2970D7CB031B4ECEDAB95E6FE4DF1D 116990~|~1~|~1~|~01/CMQ/STOW~|~Signal upgrades/replacements.~|~21 - Safety~|~2D8A01219597C8D8F32E8F2D0821C9A903A78D36 117010~|~1~|~1~|~01/NHS~|~Replace DEL-23-8.97 structure over Oberlander Run~|~04 - Reconstruction - No Added Capacity~|~85DA4F37E082C2C95FA7A48D6384F64269BBC2A0 117010~|~1~|~2~|~02/NHS~|~Resurface US 23 from 8.75 (SR 315 intersection) to 9.17 (just north of Meeker Way)~|~05 - 4R Maintenance - Resurfacing~|~CD42D00FF3D2F1255EDCD0BA3DD9EE0E88556BDF 114089~|~1~|~1~|~01/NFP~|~Created for potential J&C involvement~|~~|~CB646945C82339DDB6B9652C29C4C69A8C826B14 124824~|~1~|~1~|~01/S50/GRAN~|~Intersection and pedestrian improvements.~|~03 - Reconstruction - Added Capacity~|~FA3562684EAAB26934BE73371635E47953DE0FC0 121464~|~1~|~1~|~01/STR~|~plan split.~|~04 - Reconstruction - No Added Capacity~|~805BBA102559477D7BA41F7606EEA5B4F86CA238 108821~|~1~|~1~|~01/IMS~|~Interstate Plan Split: FRA-270-52.16-52.72~|~05 - 4R Maintenance - Resurfacing~|~C5E388C171D95DF76827428A2ABB1508A7B5070F 94801~|~1~|~1~|~01/STR~|~Rehabilitate existing bridge to extend service life on SFN 1252372 on Spangler Road over Mad River.~|~13 - Bridge Rehabilitation~|~AC94288106B503A909E1C9705713F617BAA24C23 122903~|~1~|~1~|~01/BRO~|~Plan split for gusset repair on Ashland 12th st bridge.~|~47 - Bridge Preventive Maintenance~|~386CF1FAC0FBF888EE230601CE838279FFD460AB 125061~|~1~|~1~|~01/NFP~|~Portage Lakes State Park pavement resurfacing and crack sealing.~|~05 - 4R Maintenance - Resurfacing~|~8735D7E949F51C80E3AF1BD218A6B56C723DE682 114285~|~1~|~2~|~02/IMS~|~Mowing in MOT Co.~|~44 - Other~|~059CBC315B66CE4835F1527802E0847C1A3785B0 114285~|~1~|~1~|~01/IMS~|~Mowing contract in D8~|~44 - Other~|~E33283B16CF65513F5780D36ADA552DBBF964826 88790~|~1~|~1~|~01/SAF~|~Project consists of improving the intersection of Bridgetown (SR-264), Ebenezer, and Taylor Roads from an existing five leg intersection to a conventional four leg intersection. Improvements include the addition of turn lanes, the relocation of Taylor Rd to intersect SR-264 approximately 800 ft. southwest of the intersection, storm sewers, and curb and gutter.~|~04 - Reconstruction - No Added Capacity~|~E666AE10686D88653FF2287C9B8D9BB8585341C7 88790~|~1~|~2~|~02/SAF~|~Work requested by Greater Cincinnati Water Works~|~04 - Reconstruction - No Added Capacity~|~D125902033CB866D0386E993B8AD7D8DCFA99306 106982~|~1~|~1~|~01/SAF~|~plan split~|~28 - Facilities for Pedestrians & Bicycles~|~F768956433F70D6575F28F52463DA8CDACA011E2 95217~|~1~|~1~|~01/STR~|~Tree Removal/Prunning - District Allocation~|~44 - Other~|~BD096AB18A4A7A5763543011E6A8D38120AF3A03 102799~|~1~|~1~|~01/S<2~|~Applying smooth seal to STP < 200k routes~|~05 - 4R Maintenance - Resurfacing~|~8409317675C13C5E76A5BD8B354F7F814A32393F 102799~|~1~|~2~|~02/STR~|~Applying smooth seal to STP Rural routes~|~05 - 4R Maintenance - Resurfacing~|~947AFF7066A2AEFD10F3DDDE2275D246FD0BE617 115436~|~1~|~1~|~01/NFP~|~Mowing~|~44 - Other~|~07F40E8865AF39A51176FE8C43022E50BF588E7A 102786~|~1~|~1~|~01/IMS~|~Rehabilitated Bridge PRE-70-0632 that carries Pence Shewman Rd over I-70 by replacing the concrete deck, painting, and performing other minor repairs. Rehabilitate Bridge PRE-70-0872 which carries Monroe Central Road over I-70 by replacing the concrete deck.~|~13 - Bridge Rehabilitation~|~AABB9322A38C7E8463AB7E4D4F370DCAB0984B5E 119808~|~1~|~1~|~01/SAF~|~Reconstruction of Antioch Rd (CR-12) in Clinton County to increase travel lane and shoulder widths, install rumble stripes, and remove roadside hazards.~|~21 - Safety~|~EB5EB9361B9AC17B498E2D02C67F2B4E506D7521 94377~|~1~|~1~|~01/ENH/Nile~|~Installation of lamp post lighting along State Route 46 in the City of Niles, Trumbull County, Ohio.~|~31 - Landscaping & Other Scenic Beautification~|~D595AF7726D97461F4F1DE9596699A075F5583CA 98325~|~1~|~1~|~01/SAF~|~80% federal with 20% local match for SRTS eligible work items.~|~44 - Other~|~2813F0B3B45C6F36F1C33026D086272B15DF0C9A 126750~|~1~|~1~|~01/NFP~|~Created for ODOT TID involvement.~|~44 - Other~|~3E74F9C93BCCCD2AD8A01B5C4A65DE33F0445EE4 113009~|~1~|~1~|~01/STR~|~Project to paint various bridges in Butler and Hamilton County~|~47 - Bridge Preventive Maintenance~|~2449E3C22FFBF68C606FC5F918F26D5D8C1C33B0 91852~|~2~|~2~|~02/BRO~|~"02/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601539 COS SR79 3.94 Intersect: Winding Fk Of Wakatomk Cr; BR Eligible for Replacement: Length=39 SD/FO(1) SR=36.3 DSR=4;~|~13 - Bridge Rehabilitation~|~11B4E9F7B22E300E1A1C329ADE72F4F88DB403C7 91852~|~1~|~1~|~01/STR~|~"01/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601474 COS SR79 1.6 Intersect: Winding Fk Of Wakatomk Cr; Not BR Eligible for Replacement: Length=80 SD/FO(0) SR=72.8 DSR=5;~|~13 - Bridge Rehabilitation~|~343EF65E3EC26CB1D2172CD42A974B975A1FB120 91852~|~3~|~3~|~03/BRO~|~"03/BRO/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601563 COS SR79 8.34 Intersect: Mohawk Creek; BR Eligible for Replacement: Length=43 SD/FO(1) SR=39.3 DSR=5;~|~13 - Bridge Rehabilitation~|~5FC8ECD315FC90581D276C76F6C6DEFFF2548F7F 91852~|~4~|~4~|~04/STR~|~"04/STR/BR/ " - District Preservation 4PF7(80% Federal) / 4PS7(20% State) - No CAP - Replacement of 1) 1601598 COS SR79 9.55 Intersect: Trib Of Mohawk Creek; Not BR Eligible for Replacement: Length=49 SD/FO(0) SR=60.1 DSR=5;~|~13 - Bridge Rehabilitation~|~F7CB49EBFED4B9F7910C523369C39127E7053034 103159~|~1~|~1~|~01/S>2~|~Widening of CR 25 A SLM 3.54 to 4.10~|~04 - Reconstruction - No Added Capacity~|~A853B95956369B0338F7827486EE027DD104D34E 103159~|~1~|~2~|~02/S>2~|~New Signal Installation.~|~21 - Safety~|~3CE33F91C717E6D3766F6B05E68AE0F9B3A7E0A0 116282~|~1~|~2~|~02/STR~|~Culvert replacement on MEG 681 3.87 (CFN 1881079). Funded 80 Federal/20 State.~|~04 - Reconstruction - No Added Capacity~|~610908655A28AE7B63989D07C7A3158156F49755 116282~|~1~|~1~|~01/STR~|~Landslide remediation of 7 landslide between Meigs SR 681 3.21 and 3.80.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~064D010CCB1E9816116C899C8869C3D575100E49 119581~|~1~|~1~|~01/NFP~|~Created for J&C involvement.~|~44 - Other~|~CF5A08F1C41038DB58D165CF53A5F81253290D7E 116693~|~1~|~1~|~01/STR~|~All work is in this plan split.~|~05 - 4R Maintenance - Resurfacing~|~01976B398799546ACBB935C89ED722E86FC207AA 119278~|~1~|~1~|~01/STR~|~Replace MRW-19-6.43 structure (SFN 5900182) over Whetstone Creek~|~10 - Bridge Replacement~|~DABB2FCD4EC22420BE5300113E334EBA7A805291 118751~|~1~|~1~|~01/MPO/STPK~|~Middlebranch Trail resurfacing.~|~28 - Facilities for Pedestrians & Bicycles~|~913E1EABFC4F08F79CEAC55298C1811321F4E2BC 98869~|~1~|~1~|~01/NHS~|~Replacing sidewalks on US 224 (E Main St) from Broad St to Hillside Rd in the City of Canfield.~|~21 - Safety~|~0C7C592567A3C0611E95562C9E92164982366CC2 90660~|~1~|~2~|~02/NFP~|~SFN 4831713 Sylvania Ave bridge over Ottawa River.~|~13 - Bridge Rehabilitation~|~2437970A730BD80A4391C93839415961B7E1B34B 90660~|~1~|~1~|~01/MPO~|~LUC CR5 10.1-11.16 (Sylvania Ave)~|~05 - 4R Maintenance - Resurfacing~|~72858D90146687AFC312EA578730CD6D88F455F0 104327~|~1~|~1~|~01/S>2~|~Plan split for resurfacing work on the urban STP system~|~05 - 4R Maintenance - Resurfacing~|~D7C3E327BF10B26E5E278553270F7709F48F5A3F 104327~|~1~|~2~|~02/STR~|~Split 2 for rural STP resurfacing~|~05 - 4R Maintenance - Resurfacing~|~FBC5734CA32FE46A6013FC05F649614F965F54BF 94267~|~1~|~1~|~01/MPO~|~Phillips/Willy~|~04 - Reconstruction - No Added Capacity~|~43A9FAC293816546B345A4DEC75D1BB54ADBD48C 105639~|~1~|~1~|~01/STR~|~Plan Split for bridges FRA-665-3.26 and MAD-665-5.53~|~10 - Bridge Replacement~|~429ECF0C134A030DD08C0A831AE166D9EF7FDCED 114811~|~1~|~1~|~01/SAF~|~Plan split for federally eligible construction items.~|~21 - Safety~|~5CCC5746FE17969E420B3453226B4A6363AE1D08 91934~|~1~|~1~|~01/IMS~|~100% 4CP7/Maint. Funds for 2 year mowing contract~|~21 - Safety~|~C1BAB877B0E6D0C53C6C0B02833CAD459DB6A111 96783~|~1~|~3~|~03/NFA~|~Culvert Repair: RIC-30-15.37 (Under Laver Rd.) CFN 1864899~|~44 - Other~|~D8CAAAB4E3F6924DA025D419F1262CC7BFB6FAEC 96783~|~1~|~1~|~01/STR~|~Culvert Repair: ASD-42-16.87. CFN 1803888.~|~44 - Other~|~E6454271C639AB52969AF309490937913C487D00 96783~|~1~|~2~|~02/IMS~|~Culvert Repair: ASD-71-0.67. CFN 1803915~|~44 - Other~|~61A43AC611A42F69E92C09F3EA520F8F1CBEB3C3 123340~|~1~|~1~|~01/S5K~|~Two-lane resurfacing project on WAS CR 344 0.00-0.342.~|~05 - 4R Maintenance - Resurfacing~|~8D47E9EBAE3BE39143F4293984973527F6892988 123340~|~1~|~2~|~02/STR~|~Two-lane resurfacing project on WAS CR 344 0.342-1.713. Rural route. ~|~17 - Construction Engineering~|~4EA3D6CE4D542025F6401D8183DB06D237030CA2 120590~|~1~|~1~|~01/NFA/LCEO~|~Replacement of bridge along Dutch Cross Road (TR 56).~|~10 - Bridge Replacement~|~7DFC356220D120897193E654CF4769777AB3BCB3 107178~|~1~|~1~|~01/STR~|~Resurface the existing roadway with asphalt concrete and install ADA compliant curb ramps at the intersections.~|~05 - 4R Maintenance - Resurfacing~|~6EBBB4051184C844DB7FA1141D59578915723872 102981~|~1~|~1~|~01/NHS~|~Smooth seal on NHS routes: MOT SR 725 SLM 15.26 to 18.18 & MOT SR 741 SLM 1.00 to 3.17.~|~05 - 4R Maintenance - Resurfacing~|~90148910BAAA87076DC781ABFDB48BA5CDD2445B 109655~|~1~|~1~|~01/STR~|~Resurfacing CAR-332 and HAS-332~|~05 - 4R Maintenance - Resurfacing~|~FEB7C96F8BA6A150E6074B8F624BB297534E54F7 97678~|~1~|~1~|~01/NFA~|~Replace gas lines at the District Headquarters.~|~44 - Other~|~C064E3F67E7CCCB0787310A4470F7D98150B4E52 101166~|~1~|~1~|~01/IMS~|~Plan Split for Work on Interstate~|~05 - 4R Maintenance - Resurfacing~|~16254DFA473A18181C38B25CDF470FD78BF49B6A 98197~|~1~|~1~|~01/NFP~|~District Preservation Program - 4PS7 (100% State) - No CAP - Various routes in Knox, Licking, Fairfield, and Perry Counties.~|~21 - Safety~|~6A3D62CE8B9DA117A63179274104E14609994779 116527~|~1~|~1~|~01/NHS~|~Resurfacing.~|~~|~28F2B583DFEAE3DA35C1C0C755CFC4D23129397F 88506~|~1~|~1~|~01/SAF~|~Safe Routes to School funding for curb extensions at Town/Hawkes and Town/Avondale intersections~|~21 - Safety~|~F8DAA0F7BE668210C5C3C755BA1A73772A1719C2 102202~|~1~|~1~|~01/STR~|~LAW CR 4 4.75 ER slide repair~|~44 - Other~|~0054C95714C4ADA6D95E76C83214F84E900C1F77 88859~|~1~|~1~|~01/S<2~|~Bridge Replacement~|~10 - Bridge Replacement~|~7E83F08D445156062CD7CB1E0BFA4CC1182B0AF1 124908~|~1~|~1~|~01/SAF~|~Reflective Pavement Marking project for FY2032.~|~21 - Safety~|~2E167E0881F6BF951D709E3BBF3616EC367B7125 118888~|~1~|~1~|~01/STR~|~Resurfacing SR 164 from SR 518 to SLM 14.26~|~05 - 4R Maintenance - Resurfacing~|~D38ADAB74523675EA6D7D1A7F3926142D825E271 112853~|~1~|~1~|~01/NHS~|~NHS Plan Split: UNI-42-0.00-4.43~|~05 - 4R Maintenance - Resurfacing~|~03B59DD0F0ED4F7CCDCE2024BEB2C36559BEBB0B 110187~|~1~|~2~|~02/CMQ/YTWN~|~Signal upgrade at 17 locations throughout the City of Youngstown~|~04 - Reconstruction - No Added Capacity~|~5D27909DAA38D5C64BC9036FDDFC79EFCA52308B 110187~|~1~|~1~|~01/S>2~|~Resurfacing and streetscaping, possible road diet on 5th Avenue, includes installation of a landscaped median, drainage improvements, upgrade street lighting, curbing and sidewalk replacements, upgrade curb ramps to current ADA standards,~|~04 - Reconstruction - No Added Capacity~|~996A09F4D818DB6A49D77D5D68CFB6049551D5DC 110187~|~2~|~3~|~03/S>2/YTWN~|~Resurfacing and streetscaping, possible road diet on Rayen, Phelps, Federal, Park, Front, Commerce streets, includes installation of a landscaped median, drainage improvements, upgrade street lighting, curbing and sidewalk replacements, upgrade curb ramps to current ADA standards~|~04 - Reconstruction - No Added Capacity~|~368C4D6F26E4CEC8D059A5B54ABE57B14C83B951 110187~|~3~|~4~|~04/S>2/YTWN~|~Autonomous vehicle shuttle.~|~44 - Other~|~555912DEA30C82F2913DA417D618089D01E4D341 105239~|~1~|~1~|~01/STR~|~Ac overlay~|~05 - 4R Maintenance - Resurfacing~|~183A12B5F554656CB172DF7DB4726E51D4F57966 116333~|~1~|~1~|~01/S>2~|~Plan Split for the Large Urban portions of HAM-128~|~05 - 4R Maintenance - Resurfacing~|~F120FEF6E0004C1EB1C45C9EC7085F5D50354718 116333~|~1~|~2~|~02/STR~|~Plan Split for the rural portion for HAM-128~|~05 - 4R Maintenance - Resurfacing~|~ED45D749E2281C7337EA4E4F139105297EE4DD3E 103497~|~1~|~1~|~01/STR~|~ER event OH16-01 DSR# BEL-001~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~03D228C21759F621D75CA0E4F17DE6E68869D224 104085~|~1~|~1~|~01/BRF~|~Bridge replacement.~|~10 - Bridge Replacement~|~8158A795706F2289811425EA45F2F57DE590387F 110333~|~1~|~1~|~01/SAE~|~100% Safety funded Guardrail replacement~|~21 - Safety~|~5E0CB0A33AE1D12417FDC628713EAA5F2D37ABB2 92465~|~1~|~1~|~01/IMS~|~8703426 WOO IR75 9.92 Intersect: Portage River Middle Br 8703450 WOO IR75 9.92 Intersect: Portage River Middle Br~|~~|~CE31CBEF2A946E71BC0AADEB5A74C25DCAA5DAF5 114562~|~1~|~1~|~01/STR~|~AC Overlay with Repairs.~|~05 - 4R Maintenance - Resurfacing~|~C767B3C066C192DB100ECE34DBECAE097798F4B6 114562~|~1~|~2~|~02/NFA~|~Resurface existing pavemet~|~05 - 4R Maintenance - Resurfacing~|~BFCFF78A62085EF1A559636A018177C3C7819DA7 91434~|~1~|~1~|~01/NHS~|~Bridge repair project. GAL 7 0248 (SFN 2700158), GAL 7 0323 (SFN 2700182), and GAL 7 0202 (SFN 2700123). NHS route funded 80 federal/20 state.~|~10 - Bridge Replacement~|~825BE3B60130CE497753935BA7B0CDBC2C82F589 91434~|~1~|~2~|~02/NHS~|~Culvert replacement on GAL 7 2.49-2.51. NHS route funded 80 federal/20 state.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~FD97EA5E4BF8CA538ECE5A749C271700F1327CCE 117068~|~1~|~1~|~01/NHS~|~Added plan split.~|~21 - Safety~|~DEE8A4C74DFB0ECF35C2D6786B72B7ED96861093 119057~|~1~|~1~|~01/STR~|~All work included in this split.~|~~|~280D03C9051A6F5C0C2F8349AE4A63A27770C763 76467~|~1~|~1~|~01/IMS~|~Minor pavement rehab from FRA-270-21.69 to 24.56 and FRA-315-10.61 to 12.54~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~CF5B3CFEF11E8E8FB56215A4BCC5C9AE9EA7E0B2 76467~|~1~|~2~|~02/IMS~|~Minor bridge work (patching, sealing) on 7 bridges~|~13 - Bridge Rehabilitation~|~C3E6D020DABD2106CF9D825C08459732D4C3686B 116894~|~1~|~1~|~01/MPO/ALLI~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~D650155C736AFFB38969260A1BCEE06CEFFE984F 87120~|~1~|~2~|~02/NHS~|~Seal bridge HAM-50-2138R~|~47 - Bridge Preventive Maintenance~|~0BA20A632A72F30E67003A6FABFE0988C5110AB5 87120~|~1~|~1~|~01/IMS~|~Bridge seal for HAM-71-0110~|~47 - Bridge Preventive Maintenance~|~260FB70D2267C2B900FEAABE2A475DBBE2A77032 107986~|~1~|~1~|~01/NFP~|~VGCS bridge maint.~|~21 - Safety~|~8E1E58FAE1E21BC45B585E65F4B688A616B71510 114070~|~1~|~1~|~01/NHS~|~Bridge Painting Plan Split~|~47 - Bridge Preventive Maintenance~|~A924BE187613DB5745E8D3324481556D8A0997F3 109348~|~1~|~1~|~01/NFP~|~ODNR resurfacing project in Tar Hollow State Forest.~|~04 - Reconstruction - No Added Capacity~|~679A0A34905F6B3C60418C5CDC46226D997F197D 115701~|~1~|~1~|~01/STR~|~Pavement items and miscellaneous items associated with resurfacing~|~05 - 4R Maintenance - Resurfacing~|~234F014AAC5919ACCDDD564D81ADFF66F80AADBB 115701~|~1~|~2~|~02/STR/WAL~|~Pavement Repairs~|~05 - 4R Maintenance - Resurfacing~|~F77444B151EFDDB30751A13A6B2A91A2F02FD617 101762~|~1~|~1~|~01/NFA~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~29712227AFEAF4DC3A0B298C7A374A60C189CD97 101762~|~1~|~2~|~02/STR~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~561903C6DE54C8A2E2F0F12D3CD3129EE8665568 101762~|~1~|~3~|~03/S5K~|~Resurfacing with related work.~|~05 - 4R Maintenance - Resurfacing~|~AF66B3C2459639AF494C58BC6BE4779654D38067 101762~|~1~|~4~|~04/S5K/ZANE~|~Resurfacing with related work in the City of Zanesville.~|~05 - 4R Maintenance - Resurfacing~|~108E7D510BC591B99883E3A6DC4E87F38897250E 114102~|~1~|~1~|~01/SAF~|~SR31 widening from Elwood Ave to US33 eastbound ramp intersection, including traffic signal upgrades and pedestrian improvements.~|~21 - Safety~|~3572A9D33AA09E4A90FBFA67005299542C771CA4 114102~|~1~|~2~|~02/ENH~|~Bicycle and Pedestrian facilities~|~28 - Facilities for Pedestrians & Bicycles~|~175860A374C92A759ABC9AEE5827208171E7171F 99916~|~1~|~1~|~01/SAE~|~100% CEAO HSIP for new guardrail on various county roads~|~21 - Safety~|~A2DE3FCF9DC1C512C2B142434E15DECD33927553 101443~|~1~|~1~|~01/STR~|~Stream restoration. ATH 690 0.75. DSR ATH-003.~|~06 - 4R Maintenance - Restoration & Rehabilitation~|~BE290C74C5FACF21EA7522B3278DDF7D7D8F8093 109191~|~1~|~1~|~01/NFP~|~POR TID construction of Chestnut Commerce Center Industrial Park road.~|~44 - Other~|~17D8E854E4E37416C75226E1FE3462CCC7A1CF20 97196~|~1~|~1~|~01/BRF~|~Ped covered bridge bridge. No SFN assigned.~|~13 - Bridge Rehabilitation~|~558FA9CF4419380D7124CC7636FCD85EF9362A27 110675~|~1~|~1~|~01/STR~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~431B5AAE9BE3ABE429CCC60B5CBF674FFC7DCEF7 110675~|~1~|~2~|~02/S5K~|~Resurfacing.~|~05 - 4R Maintenance - Resurfacing~|~9968B42545C85236A5D03FBB73AC34A78BB066A2 105659~|~1~|~1~|~01/STR~|~Plant Split for Runal UNI-4 bridge~|~13 - Bridge Rehabilitation~|~BA48EC4BBF292015FA4A62AE8C38DA145E512386 97466~|~1~|~1~|~01/NFA~|~Local Shared Use Path~|~28 - Facilities for Pedestrians & Bicycles~|~AF36476FDA2D30B382C1EA8114521A8865737FE4 94366~|~1~|~1~|~01/SAF~|~Construction of 8.62 miles of cable rail barrier on Nelsonville Bypass with colored concrete mowstrip and soil renovation with reseeding. ATH US 33 0.00-3.79 and HOC US 33 0.00-4.08. Funded 100% bonds.~|~21 - Safety~|~65CDDD904EEB7BA81BC8C71B780A1A67001826BC 101129~|~1~|~1~|~01/STR~|~STP Rural Resurfacing~|~05 - 4R Maintenance - Resurfacing~|~03C9377EF1CD81065491D89A244E805841D1BA98 121236~|~1~|~1~|~01/STR~|~Plan split for chip seals~|~05 - 4R Maintenance - Resurfacing~|~AA2C45B374BB340424EFC3BD8396456E26B8BDE9 104032~|~1~|~1~|~01/NFA~|~Guardrail replacement project on various routes and sections in MEG Co. Funded 100 federal.~|~21 - Safety~|~A6ED1F8883ACD898024BB0B413B1D2DA4803747A 114924~|~1~|~1~|~01/S>2~|~Resurfacing.~|~~|~36CF57B507FB9C2D4B3B061F1A8628F813093ABB 112933~|~1~|~1~|~01/NHS~|~NHS Plan Split: FRA-315-2.57-5.18~|~05 - 4R Maintenance - Resurfacing~|~6F179A32330D94EBA94B55FF6C029D2713FE45C1 107130~|~1~|~1~|~01/CMQ~|~Construction of a roundabout at the intersection of Pfeiffer Road and Deerfield Road.~|~21 - Safety~|~EE67076983018A7F30949279E9E7E8764D118716 94653~|~1~|~1~|~01/NFP~|~Local park roads - Glacier Ridge Metro Park~|~05 - 4R Maintenance - Resurfacing~|~5BEDF6F2921C198FF745C4AB99942955ADEE93F0 120759~|~1~|~1~|~01/SAE~|~single-lane roundabout at SR-3 and SR-162 West / Cobblestone Park Dr (Montville TR-0837).~|~21 - Safety~|~F4863685851E8E292B777B0606974449C9A9730B 120759~|~1~|~2~|~02/S>2~|~South bound right turn lane.~|~21 - Safety~|~29C20C532565E3F01E52C4C06EE11F38E65540E3 120288~|~1~|~1~|~01/MPO~|~Federally eligible items.~|~05 - 4R Maintenance - Resurfacing~|~CE131FE4A52D0653C8639BC628D41BC0315388AD 106419~|~1~|~1~|~01/SAF~|~GR Upgrades~|~21 - Safety~|~A030F86E6F8C3C4877F7A15D1EC22C72D0C87742 121602~|~1~|~1~|~01/CMQ/CANT~|~Construct new roundabout.~|~04 - Reconstruction - No Added Capacity~|~74D8D32D0821F00955B841BC13E3F1C4606083F7 88691~|~1~|~1~|~01/STR~|~Resurfacing of the existing roadway with asphalt concrete on US 42 from the East Corporation Limit of the Village of South Charleston (SLM 6.29) to CLA/MAD County Line (SLM 10.07)~|~05 - 4R Maintenance - Resurfacing~|~8D63D98D1EBE08B62F7B65A73E4B3E64C4658476 24970~|~1~|~1~|~01/BRO~|~Plan split to program project. Update during scoping.~|~17 - Construction Engineering~|~DE0ED7C1A8059D075F5BB38A025A6D9B4AA9F134 97973~|~1~|~2~|~02/IMS~|~Plan Split for District Bridges HAM-75-0022L and HAM-75-0030.~|~13 - Bridge Rehabilitation~|~4B1F0DFDCDAA60872659E3F2D3B29EA90BCD7787