ftp.dot.state.oh.us - /pub/Contracts/Attach/MOE-109278/appendix_D/


[To Parent Directory]

3/4/2022 6:36 AM <dir> 02.05-08.60 (SR-800 to Sardis)
3/4/2022 6:36 AM <dir> 02.94-03.26 (Jackson Twp Sec 23)
3/4/2022 6:36 AM <dir> 03.42 (Bridge Over Millers Run)
3/4/2022 6:36 AM <dir> 05.95 (Jackson Twp. Sec. 7)
3/4/2022 6:36 AM <dir> 06.19 (Bridge Over Barnes Run)
3/4/2022 6:37 AM <dir> 06.88 (Lee Twp. Sec. 2 and 8)
3/4/2022 6:37 AM <dir> 07.26 (Bridge Over Narrows Run)
3/4/2022 6:37 AM <dir> 08.39 (Bridge Over Patton Run)
3/4/2022 6:36 AM <dir> 4.32 (Bridge Replacement)
3/4/2022 6:37 AM 1162666216 Existing_Plans.zip
3/4/2022 6:37 AM <dir> MOE_7_2.06-2.21(1956)
3/4/2022 6:37 AM <dir> MOE_7_3.30
3/4/2022 6:36 AM <dir> MOE_7_4.32
3/4/2022 6:36 AM <dir> MOE_7_5.95
3/4/2022 6:36 AM <dir> MOE_7_6.19
3/4/2022 6:36 AM <dir> MOE_7_6.55-6.88
3/4/2022 6:36 AM <dir> MOE_7_7.26
3/4/2022 6:36 AM <dir> MOE_7_8.39
3/4/2022 6:36 AM <dir> MOE_ICH7_Sec.T2-BR(1926)
3/4/2022 6:36 AM <dir> MOE_SH7_Sec.S,T2(1939)
3/4/2022 6:37 AM <dir> MOE_SH7_Sec.T2-BR(1931)