ftp.dot.state.oh.us - /pub/Contracts/Attach/HAN-87005/Reference Files/Utility Final Relocation Plans ALL Utilities/BuckeyePipeline/
[To Parent Directory]
4/1/2022 11:23 AM <dir> 75-2 final Billing
4/1/2022 11:23 AM 87972 87005 Buckeye Cost Approval.pdf
4/1/2022 11:23 AM 6108096 Buckeye - HAN 75-14.39 - I-75 8-INCH Pipeline - Revised As-Built (2016-07-11a) (2).pdf
4/1/2022 11:23 AM 6108096 Buckeye - HAN 75-14.39 - I-75 8-INCH Pipeline - Revised As-Built (2016-07-11a).pdf
4/1/2022 11:23 AM 956062 BuckeyePipeline_I-75 Preliminary Reloction Plans.pdf
4/1/2022 11:22 AM <dir> CADD _File_Request
4/1/2022 11:23 AM <dir> Final Relo Plans
4/1/2022 11:22 AM 1025283 HAN 75 CONTROL POINTS 5-23-13.pdf
4/1/2022 11:23 AM 1103655 Han 75-14.39 Buckeye 75-1.pdf
4/1/2022 11:23 AM 821361 HAn-75 14.39 Buckeye pipeline re;ocation.pdf
4/1/2022 11:23 AM 1353354 HAN_75_1439_87005_STG3_SchematicPlanShts.pdf
4/1/2022 11:23 AM 956062 I-75 Preliminary Reloction Plans.pdf
4/1/2022 11:23 AM <dir> Soil Borings
4/1/2022 11:23 AM 101376 Thumbs.db